AN ACT

 

1Providing for the highway capital budget project itemization for
2the fiscal year 2014-2015 to be financed from current revenue
3or by the incurring of debt.

4The General Assembly of the Commonwealth of Pennsylvania
5hereby enacts as follows:

6CHAPTER 1

7GENERAL PROVISIONS

8Section 101. Short title.

9This act shall be known and may be cited as the Highway
10Capital Budget Project Itemization Act of 2014-2015.

11Section 102. Total authorization.

12The total authorization for the capital projects itemized in
13Chapter 3 to be constructed by the Department of Transportation,
14its successors or assigns and to be financed by the incurring of
15debt or from current revenues of the Motor License Fund shall be
16$18,155,693,000.

17Section 103. Itemization of public highway projects.

18Additional capital projects in the category of public highway
19projects to be constructed by the Department of Transportation,

1its successors or assigns and to be financed by the incurring of
2debt of from current revenues of the Motor License Fund are
3itemized in Chapter 3, together with their respective estimated
4financial costs.

5CHAPTER 3

6ITEMIZED PROJECTS

7Section 301. Adams County.

8Projects are as follows:

 

9(1) (Reserved).

 

10(2) SR 4011, Highway Portion Bridge
11Replacement, SR 4011 (Golf Course
12Road) over Carbaugh Run, Franklin
13Township, Project ID 90784

 

14Project Allocation

630,000

15(Base Project Allocation - $630,000)

 

16(3) SR 0116, Intersection Realignment,
17Turnlanes, New Signals, Intersection
18of PA 116 (Main Street, Third Street)
19and SR 2008 (Elm Avenue/Oxford
20Avenue), Conewago Township,
21McSherrystown Borough, Project ID
2285652

 

23Project Allocation

291,000

24(Base Project Allocation - $237,000)

 

25(Land Allocation - $11,000)

 

26(Design & Contingencies - $43,000)

 

27(4) SR 0034, Highway Portion Bridge
28Replacement, PA 34 (Biglerville Road)
29over a Tributary of Conewago Creek,
30Biglerville Borough, Project ID 87416

 

1Project Allocation

1,913,000

2(Base Project Allocation - $1,377,000)

 

3(Land Allocation - $46,000)

 

4(Design & Contingencies - $490,000)

 

5(5) SR 0034, Highway Portion Bridge
6Replacement, PA 34 (Carlisle Road)
7over Bermudian Creek, Huntington
8Township, Tyrone Township, Project ID
987417

 

10Project Allocation

654,000

11(Base Project Allocation - $556,000)

 

12(Land Allocation - $28,000)

 

13(Design & Contingencies - $70,000)

 

14(6) SR 2009, Highway Portion Bridge
15Replacement, SR 2009 (Black Lane Road)
16over a Tributary of Conewago Creek,
17Conewago and Oxford Townships, Project
18ID 87418

 

19Project Allocation

1,627,000

20(Base Project Allocation - $1,528,000)

 

21(Land Allocation - $8,000)

 

22(Design & Contingencies - $91,000)

 

23(7) SR 0394, Highway Portion Bridge
24Replacement, PA 394 (Hanover Street)
25over a Tributary of Conewago Creek,
26Biglerville Borough, Project ID 87422

 

27Project Allocation

144,000

28(Base Project Allocation - $144,000)

 

29(8) SR 0234, Highway Portion Bridge
30Replacement, PA 234 (Heildersburg

 

1Road) over a Tributary of Conewago
2Creek, Tyrone Township, Project ID
387426

 

4Project Allocation

248,000

5(Base Project Allocation - $248,000)

 

6(9) SR 0030, Highway Portion Bridge
7Replacement, US 30 (York Road) over
8Rock Creek, Gettysburg Borough,
9Straban Township, Project ID 87428

 

10Project Allocation

187,000

11(Base Project Allocation - $187,000)

 

12(10) SR 0234, Highway Portion Bridge
13Replacement, PA 234 (Buchannan Valley
14Road) over Conewago Creek, Franklin
15Township, Menallen Township, Project
16ID 87436

 

17Project Allocation

142,000

18(Base Project Allocation - $142,000)

 

19(11) SR 4005, Highway Portion Bridge
20Replacemnt, SR 4005 (Mount Tabor Road)
21over Opossum Creek, Menallen Township,
22Project ID 87437

 

23Project Allocation

138,000

24(Base Project Allocation - $138,000)

 

25(12) SR 1016, Highway Portion Bridge
26Replacement, SR 1016 (East Upper
27Bermudian Road) over Upper Bermudian
28Creek, Huntingdon and Tyrone
29Townships, Project ID 87671

 

30Project Allocation

195,000

1(Base Project Allocation - $195,000)

 

2(13) SR 0015, Highway Reconstruction, US
315 Southbound from Plum Run to
4Maryland State Line, Cumberland and
5Freedom Townships, Project ID 90201

 

6Project Allocation

4,600,000

7(Base Project Allocation - $4,600,000)

 

8(14) SR 2035, Resurface, SR 2035
9(Baltimore Road) from US 15 to SR 3001
10(Steinwehr Avenue), Cumberland
11Township, Gettysburg Borough, Mount
12Joy Township, Project ID 97963

 

13Project Allocation

1,500,000

14(Base Project Allocation - $1,500,000)

 

15(15) SR 2014, Highway Portion Bridge
16Replacement, SR 2014 (Harney Road)
17over Alloway Creek, Germany and Mount
18Joy Townships, Project ID 90740

 

19Project Allocation

1,141,000

20(Base Project Allocation - $1,141,000)

 

21(16) SR 2014, Highway Portion Bridge
22Replacement, SR 2014 (Georgetown Road)
23over Piney Creek, Germany Township,
24Project ID 90743

 

25Project Allocation

751,000

26(Base Project Allocation - $751,000)

 

27(17) SR 0134, Resurface, SR 3001
28(Steinwehr Avenue) to US 15,
29Cumberland Township, Gettysburg
30Borough, Project ID 90861

 

1Project Allocation

1,723,000

2(Base Project Allocation - $1,723,000)

 

3(18) SR 0194, Resurface, PA 194 (King
4Street) from PA 97 (Queen Street) to
5Littlestown Borough Line, Littlestown
6Borough, Project ID 90864

 

7Project Allocation

355,000

8(Base Project Allocation - $355,000)

 

9(19) SR 3010, Resurface, PA 116 (Main
10Street) to East of Hamiltonban
11Township Line, Fairfield Borough,
12Hamiltonban Township, Project ID 90865

 

13Project Allocation

400,000

14(Base Project Allocation - $400,000)

 

15(20) SR 0116, Resurface, PA 116
16(Fairfield Road) from Carroll Valley
17Borough Line to SR 3011 (Carrolls
18Tract Road) and SR 3016 (Miller
19Street) from PA 116 (Fairfield Road)
20to Fairfield Borough Line, Carroll
21Valley and Fairfield Boroughs and
22Hamiltonban Township, Project ID 90866

 

23Project Allocation

750,000

24(Base Project Allocation - $750,000)

 

25(21) SR 0030, Resurface, US 30
26(Chambersburg Road) from SR 3011
27(Cashtown Road) to East of Old Route
2830, Franklin Township, Project ID
2990990

 

30Project Allocation

386,000

1(Base Project Allocation - $360,000)

 

2(Design & Contingencies - $26,000)

 

3(22) SR 0094, Intersection Improvement,
4Intersection of PA 94, PA 394 and SR
51007 (Stoney Point Road), Reading
6Township, Project ID 94894

 

7Project Allocation

292,000

8(Base Project Allocation - $292,000)

 

9(23) SR 0094, Intersection improvement,
10Intersection of PA 94 (Carlisle Pike)
11and PA 234 (East Berlin Road), Reading
12Township, Project ID 94897

 

13Project Allocation

257,000

14(Base Project Allocation - $246,000)

 

15(Land Allocation - $11,000)

 

16(24) SR 0030, Resurface, East of SR 0234
17(Near Oak Drive) to East of SR 3011
18(Cashtown Road), Franklin Township,
19Project ID 96110

 

20Project Allocation

613,000

21(Base Project Allocation - $563,000)

 

22(Land Allocation - $10,000)

 

23(Design & Contingencies - $40,000)

 

24(25) SR 0116, Resurface, PA 116 (Hanover
25Road) from East of Wheatland Drive to
26West of Honda Road at the Bridge over
27Valley Brook, Bonneauville Borough and
28Mount Pleasant Township, Project ID
2996244

 

30Project Allocation

1,479,000

1(Base Project Allocation - $1,453,000)

 

2(Design & Contingencies - $26,000)

 

3(26) SR 0097, Resurface, PA 97 (Baltimore
4Pike) from US 15 to SR 2002 (White
5Hall Road), Germany Township,
6Littlestown Borough, Mount Joy and
7Union Townships, Project ID 96245

 

8Project Allocation

400,000

9(Base Project Allocation - $400,000)

 

10(27) SR 0234, Rehabilitation, Resurface,
11PA 0234 (Arendtsville Road) from PA
12234 (Narrows Road) to East of Mill
13Road, Arendtsville Borough, Project ID
1496288

 

15Project Allocation

252,000

16(Base Project Allocation - $251,000)

 

17(Design & Contingencies - $1,000)

 

18(28) SR 0034, Rehabilitation, Resurface,
19PA 34 (Carlisle Road) from Yellow Road
20to the County Line, Bendersville
21Borough, Butler, Huntington, Menallen
22and Tyrone Townships, Project ID 96289

 

23Project Allocation

2,502,000

24(Base Project Allocation - $2,501,000)

 

25(Design & Contingencies - $1,000)

 

26(29) SR 0394, Highway Portion Bridge
27Replacement, PA 394 over Conewago
28Creek, Reading and Straban Townships,
29Project ID 90698

 

30Project Allocation

3,855,000

1(Base Project Allocation - $3,533,000)

 

2(Land Allocation - $161,000)

 

3(Design & Contingencies - $161,000)

 

4(30) SR 0030, Resurface, US 30 from
5Franklin County Line to 0.5 Mile East
6of SR 0234, Franklin Township, Project
7ID 90860

 

8Project Allocation

528,000

9(Base Project Allocation - $431,000)

 

10(Land Allocation - $21,000)

 

11(Design & Contingencies - $76,000)

 

12(31) SR 0030, Intersection Improvements,
13US 30 (York Road) from West of Shealer
14Road to East of Smith Road, Straban
15Township, Project ID 101095

 

16Project Allocation

5,090,000

17(Base Project Allocation - $4,212,000)

 

18(Land Allocation - $878,000)

 

19(32) SR 0030, Resurface, US 30 from
20Gettysburg Borough Line to Old Route
2130, Cumberland and Franklin Townships,
22Project ID 101480

 

23Project Allocation

475,000

24(Base Project Allocation - $475,000)

 

25(33) SR 3001, Resurface, SR 3001 from
26Steinwehr Avenue to PA 116, Gettysburg
27Borough, Project ID 99866

 

28Project Allocation

500,000

29(Base Project Allocation - $500,000)

 

30(34) SR 0094, Resurface, PA 94 (Carlisle

 

1Road) from US 30 to Cumberland County
2Line, Hamilton, Huntington, Latimore
3and Reading Townships and York Springs
4Borough, Project ID 99867

 

5Project Allocation

9,400,000

6(Base Project Allocation - $9,400,000)

 

7(35) SR 0097, Resurface, PA 97 (Baltimore
8Pike) from White Run to US 15, Mount
9Joy Township, Project ID 98168

 

10Project Allocation

596,000

11(Base Project Allocation - $596,000)

 

12(36) SR 0015, Remove Cross Traffic
13Patterns, US 15 from Adams County Line
14to PA 94, Latimore and Huntington
15Townships, Project ID 102333

 

16Project Allocation

1,000,000

17(Base Project Allocation - $1,000,000)

 

18(37) SR 0030, SR 0015, Interchange Safety
19and Congestion Improvements, SR 0030
20Interchange with SR 0015, Straban
21Township, Project ID 0

 

22Project Allocation

3,000,000

23(Base Project Allocation - $3,000,000)

 

24(38) Various Routes, Highway Portion
25Bridge Painting, Various State Routes,
26Conewago, Cumberland and Straban
27Townships, Project ID 81087

 

28Project Allocation

1,323,000

29(Base Project Allocation - $1,119,000)

 

30(Design & Contingencies - $204,000)

 

1(39) Various Routes, Highway Portion
2Bridge Preservations, Various State
3Routes, Various Municipalities,
4Project ID 99181

 

5Project Allocation

2,400,000

6(Base Project Allocation - $2,102,000)

 

7(Design & Contingencies - $298,000)

 

8Section 302. Allegheny County.

9Projects are as follows:

 

10(1) (Reserved).

 

11(2) SR 2046, Highway Reconstruction, SR
122046 Streets Run Road from Spangler
13Street to Delwar Road, Baldwin and
14West Mifflin Boroughs, Project ID
1591796

 

16Project Allocation

4,700,000

17(Base Project Allocation - $4,050,000)

 

18(Design & Contingencies - $650,000)

 

19(3) SR 4013, Pavement Reconstruction, SR
204013 (Soose Road) from Seavey to Wible
21Run Road, Shaler Township, Project ID
2291835

 

23Project Allocation

3,431,000

24(Base Project Allocation - $3,050,000)

 

25(Design & Contingencies - $381,000)

 

26(4) SR 4011, Pavement Reconstruction, SR
274011 (Babcock Boulevard) from
28Evergreen Road to Babcock Boulevard,
29Ross Township, Project ID 91819

 

30Project Allocation

3,491,000

1(Base Project Allocation - $3,091,000)

 

2(Design & Contingencies - $400,000)

 

3(5) SR 4009, Highway Reconstruction, SR
44009 Evergreen Road, North Avenue from
540th Street Brige to Schitzen Park
6Road, Millvale Borough, Project ID
791805

 

8Project Allocation

3,490,000

9(Base Project Allocation - $3,140,000)

 

10(Design & Contingencies - $350,000)

 

11(6) SR 3103, Pavement Reconstruction, SR
123103 (McKee Road) from Oakdale Road to
13Steubenville Pike, North Fayette
14Township, Project ID 91802

 

15Project Allocation

3,491,000

16(Base Project Allocation - $3,101,000)

 

17(Design & Contingencies - $390,000)

 

18(7) SR 3084, Highway Reconstruction, SR
193084 Spring Run Road Extension from
20the County Line to Spring Run Road
21Extension, Findlay Township, Project
22ID 91801

 

23Project Allocation

3,460,000

24(Base Project Allocation - $3,080,000)

 

25(Design & Contingencies - $380,000)

 

26(8) SR 2208, Highway Reconstruction, SR
272208 Boulevard of the Allies from
28Commonwealth Place to Liberty Bridge
29and Commonwealth Place to Grant
30Street, Jefferson Borough, Project ID

 

191798

 

2Project Allocation

5,550,000

3(Base Project Allocation - $4,750,000)

 

4(Design & Contingencies - $800,000)

 

5(9) SR 0791, Pavement Reconstruction, SR
60791 (Rodi Road) from Ramp to
7Frankstown Road, Penn Hills Township,
8Project ID 91842

 

9Project Allocation

3,466,000

10(Base Project Allocation - $3,085,000)

 

11(Design & Contingencies - $381,000)

 

12(10) SR 2037, Pavement Reconstruction, SR
132037 (Pennsylvania Avenue/Westinghouse
14Avenue/McKeesport Boulevard) from
15Lincoln Way to Navy Marine Corp Way,
16North Versailles Township, White Oak
17Borough, Project ID 91795

 

18Project Allocation

3,621,000

19(Base Project Allocation - $3,120,000)

 

20(Design & Contingencies - $501,000)

 

21(11) SR 1005, Concrete Reconstruction, SR
221005 Highland Park Bridge and
23Sharpsburg Ramps, O'Hara Township,
24City of Pittsburgh, Aspinwall and
25Sharpsburg Boroughs, Project ID 91793

 

26Project Allocation

2,300,000

27(Base Project Allocation - $2,100,000)

 

28(Design & Contingencies - $200,000)

 

29(12) SR 0910, Pavement Reconstruction, SR
300910 (Gibsonia Road) from Hardt Road

 

1to Turnpike Bridge, Indiana, Richland
2and West Deer Townships, Project ID
391792

 

4Project Allocation

3,561,000

5(Base Project Allocation - $3,180,000)

 

6(Design & Contingencies - $381,000)

 

7(13) SR 0085, Pavement Reconstruction, SR
80885 (Clairton Road) from Ravensburg
9Boulevard to New England Road,
10Jefferson and West Mifflin Boroughs,
11Project ID 91791

 

12Project Allocation

3,480,000

13(Base Project Allocation - $3,150,000)

 

14(Design & Contingencies - $330,000)

 

15(14) SR 0885, Pavement Reconstruction, SR
160885 (Lebanon Road/Boulevard of the
17Allies) from Bates Street to Craft
18Avenue, City of Pittsburgh, Project ID
1991790

 

20Project Allocation

3,466,000

21(Base Project Allocation - $3,136,000)

 

22(Design & Contingencies - $330,000)

 

23(15) SR 3033, Pavement Reconstruction, SR
243033 (Main Street/Scrubgrass Road)
25from Vanadium Road to Segar Road,
26Mount Lebanon and Scott Townships,
27Project ID 91799

 

28Project Allocation

2,446,000

29(Base Project Allocation - $2,095,000)

 

30(Design & Contingencies - $351,000)

 

1(16) SR 0008, Pavement Reconstruction, SR
20008 (William Flynn Highway) from
3Saxonburg Boulevard to Butler Plank,
4Shaler Township, Project ID 91841

 

5Project Allocation

933,000

6(Base Project Allocation - $833,000)

 

7(Design & Contingencies - $100,000)

 

8(17) SR 0400, Highway Reconstruction, PA
9380 Baum Boulevard from Craig Street
10to Roup Avenue, City of Pittsburgh,
11Project ID 91787

 

12Project Allocation

3,425,000

13(Base Project Allocation - $3,075,000)

 

14(Design & Contingencies - $350,000)

 

15(18) SR 1005, Concrete Reconstruction, SR
161005 (Highland Park Bridge) Includes
17Ramps F and G (SR 8082), O'Hara
18Township, Project ID 91845

 

19Project Allocation

442,000

20(Base Project Allocation - $442,000)

 

21(19) SR 4086, Intersection Improvements,
22from SR 0019 Intersection Past Bridge
23over Pine Creek, McCandless Township,
24Project ID 0

 

25Project Allocation

1,555,000

26(Base Project Allocation - $1,113,000)

 

27(Land Allocation - $90,000)

 

28(Design & Contingencies - $352,000)

 

29(20) SR 1036, Pavement Reconstruction, SR
301036 (Indiana Road) from SR 0190 to

 

1Guys Run, Indiana Township, Project ID
291848

 

3Project Allocation

3,311,000

4(Base Project Allocation - $3,101,000)

 

5(Design & Contingencies - $210,000)

 

6(21) SR 2042, Pavement Reconstruction, SR
72042 (Fifth Street/Goldstrohm Avenue
8and Pennsylvania Avenue/Golstrohm
9Avenue) from 5th to Taft, Dravosburg
10and West Mifflin Boroughs, Project ID
1191857

 

12Project Allocation

5,501,000

13(Base Project Allocation - $4,901,000)

 

14(Design & Contingencies - $600,000)

 

15(22) SR 2051, Pavement Reconstruction, SR
162051 (Brinton Avenue/Brinton
17Road/Brighton Road) from Pallas to
18Maple Avenue, Braddock Hills,
19Edgewood, Forest Hills and North
20Braddock Boroughs, Project ID 91858

 

21Project Allocation

3,701,000

22(Base Project Allocation –$3,101,000)

 

23(Design & Contingencies - $600,000)

 

24(23) SR 2058, Pavement Reconstruction, SR
252058 (Hulton Road/Leechburg Road) from
26Indiana Road to Coxcomb Hill, Penn
27Hills Township and Plum Borough,
28Project ID 91862

 

29Project Allocation

4,701,000

30(Base Project Allocation - $4,101,000)

 

1(Design & Contingencies - $600,000)

 

2(24) SR 2074, Pavement Reconstruction, SR
32074 (Poketa Road) from Verona Road to
4Milltown Road, Penn Hills Township,
5Project ID 91863

 

6Project Allocation

5,036,000

7(Base Project Allocation - $4,501,000)

 

8(Design & Contingencies - $535,000)

 

9(25) SR 3022, Pavement Reconstruction, SR
103022 (Churchill Road) from US 88 to
11Braun, Bethel Park Borough, Project ID
1291865

 

13Project Allocation

4,176,000

14(Base Project Allocation - $3,725,000)

 

15(Design & Contingencies - $451,000)

 

16(26) SR 3031, Pavement Reconstruction, SR
173031 (Prestley Road) from Washington
18Pike to Forsythe, Bridgeville Borough,
19Collier Township, Project ID 91868

 

20Project Allocation

3,397,000

21(Base Project Allocation - $3,071,000)

 

22(Design & Contingencies - $326,000)

 

23(27) SR 3074, Pavement Reconstruction, SR
243074 (Forest Grove Road) from Forest
25Grove to Silver Lane, Robinson
26Township, Project ID 91869

 

27Project Allocation

3,178,000

28(Base Project Allocation - $2,827,000)

 

29(Design & Contingencies - $351,000)

 

30(28) SR 3077, Pavement Reconstruction, SR

 

13077 (Broadhead Road) from University
2Boulevard to Flaugherty Run Road, Moon
3Township, Project ID 91871

 

4Project Allocation

3,506,000

5(Base Project Allocation - $3,086,000)

 

6(Design & Contingencies - $420,000)

 

7(29) SR 3079, Pavement Reconstruction, SR
83079 (Maple Street Extension) from
9Park Drive to Fifth Avenue (SR 0051),
10Coraopolis Borough, Project ID 91874

 

11Project Allocation

2,880,000

12(Base Project Allocation - $2,430,000)

 

13(Design & Contingencies - $450,000)

 

14(30) SR 4064, Highway Reconstruction, SR
154064 Peebles Road from Giant Eagle/
16Mall Entrance to Duncan Avenue,
17McCandless Township, Project ID 91839

 

18Project Allocation

3,475,000

19(Base Project Allocation - $3,120,000)

 

20(Design & Contingencies - $355,000)

 

21(31) SR 4049, Pavement Reconstruction, SR
224049 (Nicholson Road) from Rochester
23Road to Bayne Wexford Road, Franklin
24Park Borough, Project ID 91695

 

25Project Allocation

631,000

26(Base Project Allocation - $240,000)

 

27(Design & Contingencies - $391,000)

 

28(32) SR 0885, Pavement Reconstruction, SR
290885 (Second Avenue) from Renova to
30Greenfield, City of Pittsburgh,

 

1Project ID 91789

 

2Project Allocation

3,432,000

3(Base Project Allocation - $3,101,000)

 

4(Design & Contingencies - $331,000)

 

5(33) SR 0060, Pavement Reconstruction, SR
60060 (Steubenville Pike) from Cornell
7Street to Windhaven Road, Kennedy and
8Robinson Townships, Project ID 91728

 

9Project Allocation

3,421,000

10(Base Project Allocation - $3,121,000)

 

11(Design & Contingencies - $300,000)

 

12(34) SR 0060, Pavement Reconstruction, SR
130060 (Steubenville Pike) from Lorish
14Road to SR 0022, Robinson Township,
15Project ID 91723

 

16Project Allocation

3,581,000

17(Base Project Allocation - $3,201,000)

 

18(Design & Contingencies - $380,000)

 

19(35) SR 0051, Pavement Reconstruction, SR
200051 (Fourth Avenue/State Street) from
21Ferree to Thorn Run, Coraopolis
22Borough, Moon Township, Project 91719

 

23Project Allocation

2,601,000

24(Base Project Allocation - $2,200,000)

 

25(Design & Contingencies - $401,000)

 

26(36) SR 0051, Resurface, SR 0051 from
27Elizabeth Bridge to Coal Valley,
28Jefferson and West Elizabeth Boroughs,
29Project ID 91714

 

30Project Allocation

2,596,000

1(Base Project Allocation - $2,596,000)

 

2(37) SR 0400, Pavement Reconstruction, PA
3380 (Frankstown Road) from Shennendoah
4to Leechburg, Penn Hills Township,
5Project ID 91739

 

6Project Allocation

3,501,000

7(Base Project Allocation - $3,146,000)

 

8(Design & Contingencies - $355,000)

 

9(38) SR 0030, Highway Reconstruction, SR
100030, Ardmore Boulevard from the
11Parkway to Rockwood Road, Forest
12Hills, Wilkinsburg, Chalfant and North
13Braddock Boroughs, Project ID 91696

 

14Project Allocation

3,600,000

15(Base Project Allocation - $3,100,000)

 

16(Design & Contingencies - $500,000)

 

17(39) SR 0837, Highway Reconstruction, SR
180837 River Road, Dravosburg Road,
19State Street from Robinson Street to
20Saint Clair Avenue, West Elizabeth and
21Jefferson Boroughs, City of Clairton,
22Project ID 91743

 

23Project Allocation

3,590,000

24(Base Project Allocation - $3,200,000)

 

25(Design & Contingencies - $390,000)

 

26(40) SR 0008, Resurface, PA 8 from
27Highland Drive to 62nd Street Bridge,
28City of Pittsburgh, Project ID 91694

 

29Project Allocation

860,000

30(Base Project Allocation - $480,000)

 

1(Design & Contingencies - $380,000)

 

2(41) SR 3077, Highway Reconstruction, SR
33077 Beaver Grade Road from
4Steubenville Pike to Clever Road,
5Robinson and Moon Townships, Project
6ID 91693

 

7Project Allocation

3,440,000

8(Base Project Allocation - $3,070,000)

 

9(Design & Contingencies - $370,000)

 

10(42) SR 3074, Pavement Reconstruction, SR
113074 (Hassem Road/Ewings Mill Road)
12from Maple Street Extension, Moon
13Township, Project ID 91692

 

14Project Allocation

3,511,000

15(Base Project Allocation - $3,110,000)

 

16(Design & Contingencies - $401,000)

 

17(43) SR 3031, Highway Reconstruction, SR
183031 Prestley Road from SR 0050 to
19Hilltop Road, Bridgeville Borough,
20Collier Township, Project ID 91690

 

21Project Allocation

3,470,000

22(Base Project Allocation - $3,120,000)

 

23(Design & Contingencies - $350,000)

 

24(44) SR 0008, Pavement Reconstruction, SR
250008 (Ardmore Boulevard/Penn Avenue)
26from Swissvale Avenue to Point Breeze
27Court, City of Pittsburgh, Wilkinsburg
28Borough, Project ID 91687

 

29Project Allocation

3,581,000

30(Base Project Allocation - $3,201,000)

 

1(Design & Contingencies - $380,000)

 

2(45) SR 4053, Highway Portion Bridge
3Preservation, Wexford Run Road over
4Raymond P. Shafer Highway, Marshall
5Township, Project ID 91596

 

6Project Allocation

6,226,000

7(Base Project Allocation - $5,791,000)

 

8(Design & Contingencies - $435,000)

 

9(46) SR 0051, Pavement Reconstruction, SR
100051 (Saw Mill Run Boulevard) from
11Warrington Avenue to Crane Avenue,
12City of Pittsburgh, Project ID 91709

 

13Project Allocation

3,551,000

14(Base Project Allocation - $3,176,000)

 

15(Design & Contingencies - $375,000)

 

16(47) SR 4061, Highway Reconstruction, SR
174061 Franklin Road from Freeport Road
18to County Line, Pine Township, Project
19ID 91777

 

20Project Allocation

3,570,000

21(Base Project Allocation - $3,180,000)

 

22(Design & Contingencies - $390,000)

 

23(48) SR 4032, Pavement Reconstruction, SR
244032 (Little Sewickley Creek Road/
25Fern Hollow Road) from Beaver Street
26to Fern Hollow Road, Bell Acres and
27Edgeworth Boroughs, Leet Township and
28Sewickley Heights Borough, Project ID
2991880

 

30Project Allocation

3,321,000

1(Base Project Allocation - $3,100,000)

 

2(Design & Contingencies - $221,000)

 

3(49) SR 0065, Highway Reconstruction, SR
40065 Ohio River Boulevard from Fort
5Duquesne to West End, City of
6Pittsburgh, Project ID 91786

 

7Project Allocation

2,635,000

8(Base Project Allocation - $2,300,000)

 

9(Design & Contingencies - $335,000)

 

10(50) SR 0065, Highway Reconstruction, SR
110065 Ohio River Boulevard from Walnut
12Street to Rapp Street, Sewickley,
13Edgeworth and Leetsdale Boroughs,
14Project ID 91785

 

15Project Allocation

650,000

16(Base Project Allocation - $270,000)

 

17(Design & Contingencies - $380,000)

 

18(51) SR 0048, Pavement Reconstruction, SR
190048 (Mosside Boulevard) from North
20Versailles to Cambridge Square Drive,
21Monroeville Borough, Project ID 91784

 

22Project Allocation

3,466,000

23(Base Project Allocation - $3,085,000)

 

24(Design & Contingencies - $381,000)

 

25(52) SR 0028, Pavement Resurface, SR 0028
26(Allegheny Valley Expressway) from SR
278050 to Powers Run Road, Aspinwall
28Borough, O'Hara Township, City of
29Pittsburgh, Project ID 91782

 

30Project Allocation

2,000,000

1(Base Project Allocation - $1,800,000)

 

2(Design & Contingencies - $200,000)

 

3(53) SR 0121, Highway Reconstruction, SR
40121 Mansfield Street from Greentree
5Road to Poplar Street, Greentree
6Borough, City of Pittsburgh, Project
7ID 91731

 

8Project Allocation

3,800,000

9(Base Project Allocation - $3,500,000)

 

10(Design & Contingencies - $300,000)

 

11(54) SR 2022, Pavement Reconstruction, SR
120022 (Stewartsville Hollow Road) from
13Lincoln Way to the County Line, White
14Oak Borough, Project ID 91779

 

15Project Allocation

1,255,000

16(Base Project Allocation - $1,150,000)

 

17(Land Allocation - $5,000)

 

18(Design & Contingencies - $100,000)

 

19(55) SR 0400, Pavement Reconstruction, PA
20380 (Bennett Street/Frankstown Road),
21Plum Borough, Project ID 91788

 

22Project Allocation

3,381,000

23(Base Project Allocation - $2,985,000)

 

24(Design & Contingencies - $396,000)

 

25(56) SR 1034, Highway Reconstruction, SR
261034 Bull Creek Road from Howes Run
27Road to Red Belt, Fawn Township,
28Project ID 91776

 

29Project Allocation

4,015,000

30(Base Project Allocation - $3,800,000)

 

1(Design & Contingencies - $215,000)

 

2(57) SR 4055, Highway Reconstruction, SR
34055 Pittsburgh-Rochester Road from SR
44052 to Friel Road, Marshall Township,
5Project ID 91775

 

6Project Allocation

3,417,000

7(Base Project Allocation - $3,032,000)

 

8(Design & Contingencies - $385,000)

 

9(58) SR 1016, Highway Reconstruction SR
101016 Lefever Road from Rich Hill Road
11to Russelton Road, Indiana Township,
12Project ID 91772

 

13Project Allocation

2,665,000

14(Base Project Allocation - $2,450,000)

 

15(Design & Contingencies - $215,000)

 

16(59) SR 1006, Highway Reconstruction, SR
171006 Locust Hill Road from SR 0910 to
18Guys Run Road, Harmar Township,
19Project ID 91759

 

20Project Allocation

3,925,000

21(Base Project Allocation - $3,750,000)

 

22(Design & Contingencies - $175,000)

 

23(60) SR 1001, Reconstruction, SR 1001
24Freeport Road from Brackenridge
25Borough to the County Line,
26Brackenridge Borough and Harrison
27Township, Project ID 91754

 

28Project Allocation

1,100,000

29(Base Project Allocation - $1,000,000)

 

30(Design & Contingencies - $100,000)

 

1(61) SR 1001, Highway Reconstruction, SR
21001 Main Street from Bridge Street to
3Highland Park Bridge, Etna and
4Sharpsburg Boroughs and O'Hara
5Township, Project ID 91751

 

6Project Allocation

2,000,000

7(Base Project Allocation - $1,800,000)

 

8(Design & Contingencies - $200,000)

 

9(62) SR 0022, Resurface, SR 0022, from
10the Washington County Line to North
11Fayette Township Line, Findlay and
12North Fayette Townships, Project ID
1391781

 

14Project Allocation

2,791,000

15(Base Project Allocation - $2,093,000)

 

16(Design & Contingencies - $698,000)

 

17(63) SR 0051, Install CCTV, Key Locations
18on the SR 0051 Corridor between SR
190088 and the Liberty Tunnels in the
20City of Pittsburgh, Intersections SR
210088 Liberty Road, Overbrook
22Boulevard, Midwood Avenue, Whited
23Avenue/Noble Lane, Edgebrook Avenue
24and Bausman Street, City of
25Pittsburgh, Project ID 94659

 

26Project Allocation

127,000

27(Base Project Allocation - $127,000)

 

28(64) SR 0028, Resurface, SR 0028
29Southbound from Etna Bypass to
30Highland Park Bridge, Aspinwall

 

1Borough, O'Hara Township and
2Sharpsburg Borough, Project ID 93012

 

3Project Allocation

532,000

4(Base Project Allocation - $532,000)

 

5(65) SR 0376, Pavement Reconstruction,
6McMichael to SR 0079, from Mile Post
762 to 63, Collier and Robinson
8Townships, Project ID 94821

 

9Project Allocation

1,600,000

10(Base Project Allocation - $1,500,000)

 

11(Design & Contingencies - $100,00)

 

12(66) SR 0376, Pavement Reconstruction and
13Rehabilitation, Business to Tonidale,
14from Mile Post 58 to 59.5, Findlay,
15Moon, North Fayette and Robinson
16Townships

 

17Project Allocation

2,000,000

18(Base Project Allocation - $1,900,000)

 

19(Design & Contingencies - $100,000)

 

20(67) SR 0279, Pavement Reconstruction and
21Rehabilitation, Camp to Wexford, from
22Mile Post 8 to 13, Franklin Park
23Borough, Ohio and Ross Townships,
24Project ID 94818

 

25Project Allocation

4,302,000

26(Base Project Allocation - $4,201,000)

 

27(Design & Contingencies - $101,000)

 

28(68) SR 0079, Pavement Reconstruction and
29Rehabilitation, Neville Island to SR
300279, from Mile Post 65 to 71, Aleppo

 

1Township, Franklin Park and Glenfield
2Boroughs, Neville, Ohio and Robinson
3Townships and Sewickley Hills Borough,
4Project ID 94812

 

5Project Allocation

5,601,000

6(Base Project Allocation - $5,500,000)

 

7(Design & Contingencies - $101,000)

 

8(69) SR 0579, Pavement Reconstruction and
9Rehabilitation, 5th Avenue to SR 0279,
10from Mile Post 0 and 1, City of
11Pittsburgh, Project ID 94826

 

12Project Allocation

2,100,000

13(Base Project Allocation - $2,000,000)

 

14(Design & Contingencies - $100,000)

 

15(70) SR 0376, Pavement Reconstruction and
16Rehabilitation, End Fort Pitt to Bates
17Street, from Mile Post 70 to 72.5,
18City of Pittsburgh, Project ID 94809

 

19Project Allocation

2,301,000

20(Base Project Allocation - $2,201,000)

 

21(Design & Contingencies - $100,000)

 

22(71) SR 0008, Safety Improvement, SR
230008, Penn Avenue from Braddock Avenue
24to Linden Avenue, City of Pittsburgh,
25Project ID 94890

 

26Project Allocation

222,000

27(Base Project Allocation - $222,000)

 

28(72) SR 4003, Install CCTV, SR 4003 from
29Evergreen Road to Peebles Road in City
30of Pittsburgh, Ross Township,

 

1McCandless, Locations are West View
2Avenue, Nelson Run Road, Babcock
3Boulevard, Siebert Road, Patrick
4Place, Ross Park Mall, Browns Lane and
5Peebles Road, City of Pittsburgh, Ross
6Township, Project ID 94658

 

7Project Allocation

122,000

8(Base Project Allocation - $122,000)

 

9(73) SR 0376, Congestion Reduction, I-
10376, Parkway East Corridor
11Transportation Network, Braddock
12Hills, Churchill, Edgewood and
13Monroeville Boroughs, Penn Hills
14Township, City of Pittsburgh,
15Swissvale Borough, Wilkins Township,
16Wilkinsburg Borough, Project ID 94651

 

17Project Allocation

1,281,000

18(Base Project Allocation - $1,281,000)

 

19(74) SR 1001, Safety Improvement, SR
201001, Freeport Road from Aspinwall to
21Blawnox, Aspinwall and Blawnox
22Boroughs, O'Hara Township, City of
23Pittsburgh, Project ID 94650

 

24Project Allocation

168,000

25(Base Project Allocation - $151,000)

 

26(Design & Contingencies - $17,000)

 

27(75) SR 0837, Highway Reconstruction, SR
288337 from 7th Avenue to Kennywood,
29Munhall, West Mifflin and Whitaker
30Boroughs, Project ID 94648

 

1Project Allocation

691,000

2(Design & Contingencies - $691,000)

 

3(76) SR 0048, Highway Portion Bridge
4Preservation, SR 0048 over Wylie Run,
5Elizabeth Township, Project ID 93784

 

6Project Allocation

400,000

7(Base Project Allocation - $400,000)

 

8(77) SR 3083, Pavement Reconstruction, SR
93083 (South Petrie Road) from Forest
10Grove Road to Cul De Sac, Robinson
11Township, Project ID 91876

 

12Project Allocation

3,391,000

13(Base Project Allocation - $3,041,000)

 

14(Design & Contingencies - $350,000)

 

15(78) SR 0376, Pavement Reconstruction and
16Rehabilitation, Bates Street to
17Edgewood, from Mile Post 73 to 76,
18City of Pittsburgh, Project ID 94811

 

19Project Allocation

3,701,000

20(Base Project Allocation - $3,601,000)

 

21(Design & Contingencies - $100,000)

 

22(79) SR 0051, Mill and Overlay, SR 0051,
23Clairton Boulevard/Saw Mill Run
24Boulevard, from the Cloverleaf to
25Weyman Run, Baldwin and Brentwood
26Boroughs, City of Pittsburgh and
27Whitehall Borough, Project ID 28397

 

28Project Allocation

3,745,000

29(Base Project Allocation - $3,745,000)

 

30(80) SR 0376, Interchange Improvements,

 

1I-376 Banksville Interchange, Includes
2SR 0019/0051 at Woodville Avenue to I-
3376 Westbound, City of Pittsburgh,
4Project ID 97028

 

5Project Allocation

4,892,000

6(Base Project Allocation - $4,796,000)

 

7(Land Allocation - $96,000)

 

8(81) SR 0376, Interchange Reconstruction,
9I-376, Carnegie Interchange, Carnegie
10Borough, Allegheny County, Carnegie
11and Rosslyn Farms Boroughs, Scott
12Township, Project ID 97027

 

13Project Allocation

2,587,000

14(Base Project Allocation - $2,506,000)

 

15(Land Allocation - $81,000)

 

16(82) SR 0019, Reconstruction, SR 0019
17from West End Bypass to Parkway
18Including Shaler Street Bridge, City
19of Pittsburgh, Project ID 96562

 

20Project Allocation

787,000

21(Design & Contingencies - $787,000)

 

22(83) SR 4084, Highway Reconstruction, SR
234084 from East Street to Chestnut
24Street, City of Pittsburgh, Project ID
2596561

 

26Project Allocation

1,656,000

27(Design & Contingencies - $1,656,000)

 

28(84) SR 0837, Mill and Overlay, SR 0837
29from Homestead Bridge to Baldwin Road,
30City of Pittsburgh and West Homestead

 

1Borough, Project ID 96559

 

2Project Allocation

456,000

3(Base Project Allocation - $456,000)

 

4(85) SR 0376, Pavement Reconstruction and
5Rehabilitation, Edgewood to Churchill,
6from Mile Post 76.5 to 79.5, Braddock
7Hills, Churchill and Edgewood
8Boroughs, City of Pittsburgh,
9Swissvale and Wilkinsburg Boroughs,
10Project ID 94825

 

11Project Allocation

3,701,000

12(Base Project Allocation - $3,601,000)

 

13(Design & Contingencies - $100,000)

 

14(86) SR 3104, Highway Portion Bridge
15Preservation, SR 3104 over the Ohio
16River, McKees Rocks Borough, Project
17ID 28344

 

18Project Allocation

782,000

19(Base Project Allocation - $602,000)

 

20(Design & Contingencies - $180,000)

 

21(87) SR 0376, Resurface, I-376 (Old 22)
22from Tonidale Interchange to McMichael
23Road, Collier, North Fayette and
24Robinson Townships, Project ID 93011

 

25Project Allocation

342,000

26(Base Project Allocation - $342,000)

 

27(88) SR 3027, Highway Portion Bridge
28Preservation, Smithfield Street Bridge
29in City of Pittsburgh, City of
30Pittsburgh, Project ID 28525

 

1Project Allocation

3,610,000

2(Base Project Allocation - $1,814,000)

 

3(Land Allocation - $164,000)

 

4(Design & Contingencies - $1,632,000)

 

5(89) SR 1034, Highway Reconstruction, SR
61034 from SR 0366 to End of Concrete
7Pavement at Freeport Road and Taretum
8Bridge Intersection, Harrison
9Township, Project ID 37596

 

10Project Allocation

3,600,000

11(Base Project Allocation - $3,350,000)

 

12(Design & Contingencies - $250,000)

 

13(90) SR 0051, Roadway Resurfacing and
14Safety Improvements, SR 0051 (Saw Mill
15Road Boulevard), from the Intersection
16with Midwood Avenue to Edgebrook
17Avenue, City of Pittsburgh, Project ID
1896076

 

19Project Allocation

268,000

20(Base Project Allocation - $268,000)

 

21(91) SR 0376, Installation of CCTV
22Cameras, DMS and Other ITS Equipment,
23Located on SR 0028 from SR 0008 to
24Pittsburgh Mills Interchange, also
25Includes I-376 from Toll I-376 to the
26West Middlesex Interchange and SR 422
27from Toll I-376 to Business 422,
28Various Municipalities in Allegheny,
29Lawrence and Mercer Counties, Project
30ID 95759

 

1Project Allocation

330,000

2(Base Project Allocation - $301,000)

 

3(Design & Contingencies - $29,000)

 

4(92) SR 3009, Highway Reconstruction, SR
53009 McMurray Road from Washington
6County Line to Clifton Road, Bethel
7Park Borough, Project ID 51426

 

8Project Allocation

400,000

9(Base Project Allocation - $400,000)

 

10(93) SR 0019, Highway Portion Bridge
11Paint, SR 0019 over the Ohio River,
12City of Pittsburgh, Project ID 62528

 

13Project Allocation

494,000

14(Base Project Allocation - $390,000)

 

15(Design & Contingencies - $104,000)

 

16(94) SR 9900, Intersection Improvements,
17Lebanon Church Road at Pittsburgh-
18McKeesport Boulevard, West Mifflin
19Borough, Project ID 27497

 

20Project Allocation

298,000

21(Base Project Allocation - $200,000)

 

22(Land Allocation - $18,000)

 

23(Design & Contingencies - $80,000)

 

24(95) PA 28, Reconstruction, East Ohio
25Street to 40th Street Bridge, City of
26Pittsburgh, Project ID 92269

 

27Project Allocation

7,000,000

28(Base Project Allocation - $7,000,000)

 

29(96) SR 0376, Highway Portion Bridge
30Preservation, I-376, Six Bridges in

 

1Allegheny County, Carnegie Borough,
2Collier Township, Greentree Borough,
3City of Pittsburgh, Robinson and Scott
4Townships, Project ID 93014

 

5Project Allocation

6,318,000

6(Base Project Allocation - $6,312,000)

 

7(Design & Contingencies - $6,000)

 

8(97) SR 0028, Mill and Overlay, SR 0028,
9Harmarville to Russelton, East Deer,
10Frazer, Harmar and Springdale
11Townships, Project ID 92276

 

12Project Allocation

99,000

13(Base Project Allocation - $99,000)

 

14(98) SR 228, Highway Reconstruction, Ridc
15Park to Harmarville, Harmar and O'Hara
16Townships, Project ID 92275

 

17Project Allocation

12,350,000

18(Base Project Allocation -
19$11,850,000)

 

20(Design & Contingencies - $500,000)

 

21(99) SR 0028, Highway Reconstruction,
22Etna Bypass to Highland Park,
23Aspinwall Borough, O'Hara Township,
24City of Pittsburgh, Project ID 92273

 

25Project Allocation

1,991,000

26(Base Project Allocation - $1,991,000)

 

27(100) SR 0028, Reconstruction, Etna
28Interchange to Etna Bypass, Shaler
29Township, Etna and Sharpsburg
30Boroughs, Project ID 92272

 

1Project Allocation

4,000,000

2(Base Project Allocation - $4,000,000)

 

3(101) SR 0065, Highway Reconstruction, SR
40065, from Fort Duquesne Bridge to
5California Avenue, City of Pittsburgh,
6Project ID 92279

 

7Project Allocation

1,800,000

8(Base Project Allocation - $1,800,000)

 

9(102) SR 0028, Reconstruction, 40th
10Street Bridge to Millvale Borough
11Line, Millvale Borough, Project ID
1292270

 

13Project Allocation

2,000,000

14(Base Project Allocation - $2,000,000)

 

15(103) SR 0065, Mill and Resurface, SR
160065 from Fort Duquesne Bridge to
17Eckert Street, City of Pittsburgh,
18Project ID 92280

 

19Project Allocation

1,923,000

20(Base Project Allocation - $1,722,000)

 

21(Design & Contingencies - $201,000)

 

22(104) SR 0028, Reconstruction, General
23Robinson Street to East Ohio Street,
24City of Pittsburgh, Project ID 92266

 

25Project Allocation

3,700,000

26(Base Project Allocation - $3,700,000)

 

27(105) SR 4062, Pavement Reconstruction,
28SR 4062 (Glenshaw Avenue) from Mount
29Royal Boulevard to Butler Plank Road,
30Shaler Township, Project ID 91895

 

1Project Allocation

3,428,000

2(Base Project Allocation - $3,038,000)

 

3(Design & Contingencies - $390,000)

 

4(106) SR 4054, Highway Reconstruction, SR
54054 Freeport Road from Perry Highway
6to Franklin Road, Marshall and Pine
7Townships, Project ID 91884

 

8Project Allocation

3,460,000

9(Base Project Allocation - $3,080,000)

 

10(Design & Contingencies - $380,000)

 

11(107) SR 4039, Pavement Reconstruction,
12SR 4039 (Henry Road/Audubon Road) from
13Camp Meeting Road to Magee Road,
14Franklin Park, Sewickley Heights and
15Sewickley Hills Boroughs, Project ID
1691883

 

17Project Allocation

3,471,000

18(Base Project Allocation - $3,130,000)

 

19(Design & Contingencies - $341,000)

 

20(108) SR 4034, Pavement Reconstruction,
21SR 4034 (Audubon/Little Sewickley
22Creek Road) from Fern Hollow Road to
23Magee Road Extension, Franklin Park,
24Sewickley Heights and Sewickley Hills
25Boroughs, Project ID 91881

 

26Project Allocation

3,482,000

27(Base Project Allocation - $3,101,00)

 

28(Design & Contingencies - $381,000)

 

29(109) SR 0366, Highway Reconstruction, SR
300366, Tarentum Bridge, Tarentum

 

1Borough, Project ID 91590

 

2Project Allocation

530,000

3(Base Project Allocation - $200,000)

 

4(Design & Contingencies - $330,000)

 

5(110) SR 0028, Reconstruction, SR 0028
6North Bound, Millvale Borough Line to
7Etna Interchange, Shaler Township,
8Project ID 92271

 

9Project Allocation

16,000,000

10(Base Project Allocation -
11$16,000,000)

 

12(111) SR 0910, Interchange Improvements,
13SR 0910, Wexford Bayne Road, Franklin
14Park Borough and Marshall Township,
15Project ID 92937

 

16Project Allocation

3,500,000

17(Base Project Allocation - $3,500,000)

 

18(112) SR 0079, Highway Restoration, I-79,
19from Washington County to Bridgeville,
20Bridgeville Borough and South Fayette
21Township, Project ID 93010

 

22Project Allocation

1,520,000

23(Base Project Allocation - $1,520,000)

 

24(113) SR 0579, Highway Portion of Bridge
25Preservation, I-579 from Ramp G over
26the Liberty Bridge Approach and Ramp H
27to the Boulevard of Allies and
28continues along Crosstown Including
29the Overhead Structures of Bedford,
30Webster and Center Avenues, City of

 

1Pittsburgh, Project ID 93009

 

2Project Allocation

494,000

3(Base Project Allocation - $494,000)

 

4(114) SR 4047, Slope and Roadway
5Improvements, SR 4047 Smith Ferry
6Road, Marshall Township, Project ID
792944

 

8Project Allocation

399,000

9(Base Project Allocation - $399,000)

 

10(115) SR 3074, Slope and Roadway
11Improvements, SR 3074 Ewings Mill
12Road, Robinson Township, Project ID
1392943

 

14Project Allocation

31,000,000

15(Base Project Allocation -
16$31,000,000)

 

17(116) SR 3074, Slope and Roadway
18Improvements, SR 3074 Ewings Mill
19Road, Robinson Township, Project ID
2092941

 

21Project Allocation

228,000

22(Base Project Allocation - $228,000)

 

23(117) SR 0028, Resurface, SR 0028 from
24Russelton to Butler County Line, East
25Deer, Fawn and Harrison Townships,
26Project ID 92277

 

27Project Allocation

851,000

28(Land Allocation - $301,000)

 

29(Design & Contingencies - $550,000)

 

30(118) SR 1013, Repair Slope Failure and

 

1Roadway, on SR 1013 (Saxonburg
2Boulevard) near the Intersection of
3Bakerstown Culmerville Road, West Deer
4Township, Project ID 92938

 

5Project Allocation

1,680,000

6(Base Project Allocation - $1,680,000)

 

7(119) SR 3089, Pavement Reconstruction,
8SR 3089 (Flaugherty Run Road) from
9Moon Clinton Road to Stoops Ferry,
10Findlay and Moon Townships, Project ID
1191878

 

12Project Allocation

3,500,000

13(Base Project Allocation - $3,150,000)

 

14(Design & Contingencies - $350,00)

 

15(120) SR 0050, Roadway Widening, SR 0050
16from Thoms Run Road to Landgraf
17Avenue, Collier Township, Project ID
1892936

 

19Project Allocation

6,500,000

20(Base Project Allocation - $6,500,000)

 

21(121) SR 3054, Slope and Roadway
22Improvements, SR 3054 to Cowan Road,
23Collier Township, Project ID 92935

 

24Project Allocation

2,800,000

25(Base Project Allocation - $2,800,000)

 

26(122) SR 2208, Resurface, SR 2208
27(Boulevard of the Allies) from
28Commonwealth Place to Liberty Bridge
29and Commonwealth Place to Grant, City
30of Pittsburgh, Project ID 92932

 

1Project Allocation

143,000

2(Base Project Allocation - $143,000)

 

3(123) SR 3069, Tunnel Rehabilitation,
4Liberty Tunnel, City of Pittsburgh,
5Project ID 92930

 

6Project Allocation

3,705,000

7(Base Project Allocation - $3,705,000)

 

8(124) SR 3006, Resurface, SR 3006 to SR
90019 in South Fayette and Upper Saint
10Clair, South Fayette and Upper Saint
11Clair Townships, Project ID 92929

 

12Project Allocation

304,000

13(Base Project Allocation - $304,000)

 

14(125) SR 0028, Drainage Improvements, off
15SR 0028 in Reserve Township, City of
16Pittsburgh, Millvale Borough, Project
17ID 92320

 

18Project Allocation

60,000

19(Base Project Allocation - $60,000)

 

20(126) SR 2084, Slope and Roadway
21Improvements, SR 2084, Plum Borough,
22Project ID 92939

 

23Project Allocation

1,825,000

24(Base Project Allocation - $1,825,000)

 

25(127) SR 2078, Highway Reconstruction, SR
262078 from Hulton Road to Indiana Road,
27Segments 0010 to 0040/1385, Penn Hills
28Township, Project ID 82288

 

29Project Allocation

455,000

30(Base Project Allocation - $455,000)

 

1(128) SR 3037, Highway Reconstruction, SR
23037 from Castle Shannon Boulevard to
3Washington Road, Mount Lebanon
4Township and Dormont Borough, Project
5ID 82271

 

6Project Allocation

312,000

7(Base Project Allocation - $312,000)

 

8(129) SR 4013, Highway Reconstruction,
9Parker Street to Wible Run Road,
10Segments 0010 through 0020/2278,
11Shaler Township, Project ID 82272

 

12Project Allocation

309,000

13(Base Project Allocation - $309,000)

 

14(130) SR 4022, Highway Reconstruction,
15Arndt Road to Rochester Road, Segments
160010 through 0140, Ross and Ohio
17Townships and Sewickley Hills and
18Franklin Park Boroughs, Project ID
1982273

 

20Project Allocation

666,000

21(Base Project Allocation - $666,000)

 

22(131) SR 4022, Highway Reconstruction,
23Mount Nebo Road to Reis Run Road,
24Segments 0080 through 0100, Ohio
25Township and Franklin Park Borough,
26Project ID 82274

 

27Project Allocation

632,000

28(Base Project Allocation - $632,000)

 

29(132) SR 1030, Highway Reconstruction,
30Russelton Road to Bull Creek Road,

 

1Segments 0004 through 0050/2305, Fawn,
2Frazer and West Deer Townships,
3Project ID 82276

 

4Project Allocation

881,000

5(Base Project Allocation - $881,000)

 

6(133) SR 4026, Highway Reconstruction, SR
74046 Sample Road from Peebles Road to
8Mount Royal Boulevard, McCandless and
9Hampton Townships, Project ID 82277

 

10Project Allocation

861,000

11(Base Project Allocation - $861,000)

 

12(134) SR 1025, Highway Reconstruction,
13Lafever Hill Road to Mill Dam Road,
14Segments 0010 through 0040, Indiana
15Township, Project ID 82278

 

16Project Allocation

543,000

17(Base Project Allocation - $543,000)

 

18(135) SR 4027, Highway Reconstruction,
19Arndt Road to Rochester Road, Segments
200010 through 0020/3731, Franklin Park
21Borough, Project ID 82279

 

22Project Allocation

1,088,000

23(Base Project Allocation - $1,088,000)

 

24(136) SR 1019, Highway Reconstruction, SR
251019 from Riddle Run to Crawford Run
26Road, Segments 0010 through 0110,
27Springdale and Frazer Townships,
28Springdale Borough, Project ID 82281

 

29Project Allocation

1,800,000

30(Base Project Allocation - $1,800,000)

 

1(137) SR 1031, Highway Reconstruction, SR
23001 Bull Creek to County Line, Fawn
3Township, Project ID 82282

 

4Project Allocation

579,000

5(Base Project Allocation - $579,000)

 

6(138) SR 1035, Highway Reconstruction,
7Bull Creek Road to Burtner Road,
8Segments 0010 through 0060/0750, Fawn
9Township, Project ID 82283

 

10Project Allocation

910,000

11(Base Project Allocation - $910,000)

 

12(139) SR 2001, Highway Reconstruction,
13Third Street to Zemprelli Bridge,
14Segments 0180 through 0300/2405,
15Elizabeth Township, Elizabeth,
16Glassport and Lincoln Boroughs,
17Project ID 82284

 

18Project Allocation

3,200,000

19(Base Project Allocation - $3,200,000)

 

20(140) SR 2003, Highway Reconstruction,
21Raccoon Run to Bunola River Road,
22Segments 0010 through 0030/2915,
23Forward Township, Project 82285

 

24Project Allocation

585,000

25(Base Project Allocation - $585,000)

 

26(141) SR 0028, Highway Reconstruction, SR
270028 Allegheny Valley Expressway, from
28SR 8050 to Bridge over Powers Run
29Road, O'Hara Township, City of
30Pittsburgh, Aspinwall and Sharpsburg

 

1Boroughs, Project ID 91592

 

2Project Allocation

3,650,000

3(Base Project Allocation - $3,300,000)

 

4(Design & Contingencies - $350,000)

 

5(142) SR 4003, Safety Improvement, SR
64003 Intersections with Patrick Place,
7Babcock Boulevard and Peebles Road,
8Siebert Road, McIntyre Road, Ross
9Township, Project ID 82556

 

10Project Allocation

53,000

11(Base Project Allocation - $50,000)

 

12(Design & Contingencies - $3,000)

 

13(143) SR 3072, Highway Reconstruction,
14Route 60 to Beaver Grade Road,
15Segments 0010 through 0060, Robinson
16and Moon Townships, Project ID 82223

 

17Project Allocation

715,000

18(Base Project Allocation - $715,000)

 

19(144) SR 0008, Roadway Widening, SR 0008
20(William Flynn Highway) from Structure
21over Pine Creek on SR 0008 and Ends
22Approximately 1200 Feet North,
23Approximately 350 Feet of Duncan
24Avenue will be Realigned, Hampton
25Township, Project ID 86858

 

26Project Allocation

913,000

27(Base Project Allocation - $720,000)

 

28(Land Allocation - $95,000)

 

29(Design & Contingencies - $98,000)

 

30(145) SR 0192, Bituminous Overlay,

 

1Resurface, Coraopolis Heights Road to
2Hickman Road, Segments 0010/0000
3through 0080/0000, Moon Township,
4Project ID 82224

 

5Project Allocation

2,187,000

6(Base Project Allocation - $2,187,000)

 

7(146) SR 0837, Safety Improvement, SR
80065, SR 0837, SR 0885, SR 3144, SR
92040, SR 0130 and SR 0019 in Allegheny
10County (90 Sites) and SR 0018 in New
11Castle, Lawrence County (9 Sites),
12Various Municipalities in Allegheny
13and Lawrence Counties, Project ID
1484028

 

15Project Allocation

1,709,000

16(Base Project Allocation - $1,609,000)

 

17(Design & Contingencies - $100,000)

 

18(147) SR 3037, Safety Improvement, SR
193037 (Castle Shannon Boulevard),
20between Willow Avenue and Mount
21Lebanon Boulevard, Segments 0040/0000
22to 0050/1500, Castle Shannon Borough,
23Mount Lebanon Township, Project ID
2483157

 

25Project Allocation

95,000

26(Base Project Allocation - $95,000)

 

27(148) SR 2005, Highway Reconstruction,
28River Road to River Hill Road,
29Segments 0010 through 0070/1710,
30Forward Township, Project ID 82286

 

1Project Allocation

1,212,000

2(Base Project Allocation - $1,212,000)

 

3(149) SR 0030, Safety Improvement, SR
40030 from Broadway to Westmoreland
5County Line, Findlay Township, Project
6ID 82557

 

7Project Allocation

315,000

8(Base Project Allocation - $300,000)

 

9(Design & Contingencies - $15,000)

 

10(150) SR 2009, Highway Reconstruction,
11Monongahela Road to Williamsport Road,
12Segments 0010 through 0030/3463,
13Forward Township, Project ID 82287

 

14Project Allocation

595,000

15(Base Project Allocation - $595,000)

 

16(151) SR 2040, Safety Improvement, SR
172040 from Brownsville Road to
18Bombardier Incorporated on Lebanon
19Church Road, Pleasant Hills and West
20Mifflin Boroughs, Project ID 82554

 

21Project Allocation

315,000

22(Base Project Allocation - $300,000)

 

23(Design & Contingencies - $15,000)

 

24(152) SR 2075, Highway Reconstruction, SR
252075 Sardis Road to County Line
26Segments 0150 through 0190/2404, Plum
27Borough, Project ID 82294

 

28Project Allocation

748,000

29(Base Project Allocation - $748,000)

 

30(153) SR 2074, Highway Reconstruction, SR

 

12074 from Verona Street to Hulton
2Road, Segments 0010 through 0030, Penn
3Hills Township, Project ID 82293

 

4Project Allocation

471,000

5(Base Project Allocation - $471,000)

 

6(154) SR 2017, Highway Reconstruction,
7West Newton Road to Nichols Hill,
8Segments 0010 through 0070, Elizabeth
9Township, Project ID 82290

 

10Project Allocation

757,000

11(Base Project Allocation - $757,000)

 

12(155) SR 1045, Highway Reconstruction,
13Bakerstown Road to Canon Hill Road,
14Segments 0010 through 0020/2168, West
15Deer Township, Project ID 82289

 

16Project Allocation

315,000

17(Base Project Allocation - $315,000)

 

18(156) SR 3011, Reconstruction, SR 3011
19Brownsville Road to Library Road,
20Bethel Park Borough and South Park
21Township, Project ID 82267

 

22Project Allocation

962,000

23(Base Project Allocation - $301,000)

 

24(Design & Contingencies - $661,000)

 

25(157) SR 0121, Safety Improvement, SR
260121 at Potomac Avenue, McMonagle
27Street and Shopping Center, Mount
28Lebanon and Scott Townships, Project
29ID 82559

 

30Project Allocation

105,000

1(Base Project Allocation - $100,000)

 

2(Design & Contingencies - $5,000)

 

3(158) SR 4024, Highway Reconstruction,
4Perry Highway to McKnight Road,
5Segments 0010 through 0030/1485,
6McCandless Township, Project ID 82238

 

7Project Allocation

228,000

8(Base Project Allocation - $228,000)

 

9(159) SR 3021, Highway Reconstruction,
10River Road to Walton Road, Segments
110010 through 0030/3105, Jefferson
12Borough, Project ID 82270

 

13Project Allocation

189,000

14(Base Project Allocation - $189,000)

 

15(160) SR 4061, Highway Reconstruction,
16Warrendale Road to Freeport Road,
17Segments 0010 through 0030/2091, Pine
18Township, Project ID 82246

 

19Project Allocation

491,000

20(Base Project Allocation - $491,000)

 

21(161) SR 4054, Highway Reconstruction,
22Perry Highway to Franklin Road,
23Segments 0010 through 0030/3363,
24Marshall and Pine Townships, Project
25ID 82245

 

26Project Allocation

510,000

27(Base Project Allocation - $510,000)

 

28(162) SR 3033, Highway Reconstruction,
29Bower Hill to Swallow Hill, Segments
300040 through 0040/2050, Scott and

 

1Mount Lebanon Townships, Project ID
282244

 

3Project Allocation

127,000

4(Base Project Allocation - $127,000)

 

5(163) SR 4052, Highway Reconstruction,
6Pleasant Hill Road to Perry Highway,
7Segments 0060 through 0100, Marshall
8Township, Project ID 82242

 

9Project Allocation

1,728,000

10(Base Project Allocation - $1,728,000)

 

11(164) SR 4065, Resurface, Wildwood Road
12to Gibsonia Road, Segments 0010/0000
13through 0050/3034, Hampton and
14Richland Townships, Project ID 82249

 

15Project Allocation

602,000

16(Base Project Allocation - $301,000)

 

17(Design & Contingencies - $301,000)

 

18(165) SR 4032, Highway Reconstruction, SR
194032 Little Sewickley Road from
20Beavers Road to Fern Hollow Road,
21Segments 0010 through 0080, Leet
22Township, Edgeworth, Sewickley Heights
23and Bell Acres Boroughs, Project ID
2482239

 

25Project Allocation

3,152,000

26(Base Project Allocation - $3,152,000)

 

27(166) SR 4067, Highway Reconstruction
28Route 8 William Penn Highway to Middle
29Road, Segments 0080 through 0110/2447,
30Hampton Township, Project ID 82251

 

1Project Allocation

501,000

2(Base Project Allocation - $501,000)

 

3(167) SR 4024, Highway Reconstruction,
4Thompson Run Road to Mount Royal
5Boulevard, Segments 0070 through 0100,
6McCandless and Hampton Townships,
7Project ID 82234

 

8Project Allocation

598,000

9(Base Project Allocation - $598,000)

 

10(168) SR 0192, Bituminous Overlay,
11Resurface, Coraopolis Heights Road to
12Heckman Road, Segments 0010/0000
13through 0080/0000, Moon Township,
14Project ID 82225

 

15Project Allocation

542,000

16(Base Project Allocation - $542,000)

 

17(169) SR 4023, Highway Reconstruction,
18Union Avenue to Perrysville Road,
19Segments 0010/0000 through 0020/2224,
20Kilbuck Township, Avalon and Ben Avon
21Heights Boroughs, Project ID 82233

 

22Project Allocation

426,000

23(Base Project Allocation - $426,000)

 

24(170) SR 4012, Highway Reconstruction, SR
254012 Ohio River Boulevard to I-279
26Ramps, Segments 0010 through 0060,
27Ross Township, Bellevue Borough,
28Project ID 82232

 

29Project Allocation

582,000

30(Base Project Allocation - $582,000)

 

1(171) SR 4011, Highway Reconstruction,
2Babcock Boulevard to Perry Highway,
3Segments 0050 through 0080, Ross
4Township, Project ID 82230

 

5Project Allocation

426,000

6(Base Project Allocation - $426,000)

 

7(172) SR 4011, Highway Reconstruction,
8Nicholson Road to Wexford Bayne Road,
9Segments 0220 through 0240, Franklin
10Park Borough, Project ID 82228

 

11Project Allocation

1,512,000

12(Base Project Allocation - $1,512,000)

 

13(173) SR 4032, Highway Reconstruction,
14Little Swickley Creek Road to Magee
15Road, Extension Segments 0080 through
160120/3318, Sewickley Heights, Bell
17Acres and Franklin Park Boroughs,
18Project ID 82241

 

19Project Allocation

900,000

20(Base Project Allocation - $900,000)

 

21(174) SR 0130, Highway Reconstruction, SR
220130 from Mosside Boulevard to County
23Line, Monroeville and Trafford
24Boroughs, Project ID 82260

 

25Project Allocation

270,000

26(Base Project Allocation - $270,000)

 

27(175) SR 3033, Highway Reconstruction, SR
283033 from Vanadium Road to Scrubgrass
29Road, Segments 0010 through 0020,
30Scott Township, Project ID 82220

 

1Project Allocation

189,000

2(Base Project Allocation - $189,000)

 

3(176) SR 1016, Highway Reconstruction,
4Rich Hill Road to Little Deer Creek,
5Segments 0060 through 0080/2140,
6Indiana Township, Project ID 82266

 

7Project Allocation

730,000

8(Base Project Allocation - $730,000)

 

9(177) SR 1015, Highway Reconstruction,
10Gulf Lab Road to Voskamp Drive,
11Segments 0030/0475 through 0070,
12Harmar and Indiana Townships, Project
13ID 82265

 

14Project Allocation

1,024,000

15(Base Project Allocation - $1,024,000)

 

16(178) SR 1014, Highway Reconstruction, SR
171014 Hite Road from Russelton Road to
18the Overpass, Segments 0010 through
190050, Springdale and Harmar Townships,
20Project ID 82264

 

21Project Allocation

384,000

22(Base Project Allocation - $384,000)

 

23(179) SR 0906, Highway Reconstruction,
24Westmoreland Road to Rainbow Run Road,
25Segments 0010 through 0010/0340,
26Forward Township, Project ID 82263

 

27Project Allocation

195,000

28(Base Project Allocation - $195,000)

 

29(180) SR 4064, Highway Reconstruction, 
30Sample Road to Hemlock Drive, Segments
 

 

10040 through 0050/3039, McCandless 
2Township, Project ID 82248

 

3Project Allocation

354,000

4(Base Project Allocation - $354,000)

 

5(181) SR 0136, Highway Reconstruction,
6Bunola River Road to Beckets Run Road,
7Segments 0020 through 0070, Forward
8Township, Project ID 82261

 

9Project Allocation

865,000

10(Base Project Allocation - $865,000)

 

11(182) SR 3012, Highway Reconstruction,
12Berryman Avenue to Library Road,
13Segments 0010 through 0040/2107, South
14Park Township, Bethel Park Borough,
15Project ID 82269

 

16Project Allocation

637,000

17(Base Project Allocation - $637,000)

 

18(183) SR 0130, Pavement Reconstruction,
19Old William Penn Highway to Fenwick,
20Segments 0162/0000 through 0182/0000,
21Churchill Borough, Project ID 82259

 

22Project Allocation

3,415,000

23(Base Project Allocation - $3,164,000)

 

24(Design & Contingencies - $251,000)

 

25(184) SR 0130, Highway Reconstruction, SR
260130 from Lime Hollow Road to McCrady
27Road, Penn Hills Township, Churchill
28Borough, Project ID 82258

 

29Project Allocation

712,000

30(Base Project Allocation - $712,000)

 

1(185) SR 0130, Highway Preservation,
2Restoration, Reconstruction, State
3Street to Mosside Road, Segments 0302
4through 0332, Monroeville and Pitcairn
5Boroughs, Project ID 82256

 

6Project Allocation

960,000

7(Base Project Allocation - $960,000)

 

8(186) SR 4070, Highway Reconstruction,
9Highland Road to Perry Highway,
10Segments 0010 through 0030, McCandless
11Township, Project ID 82255

 

12Project Allocation

436,000

13(Base Project Allocation - $436,000)

 

14(187) SR 4068, Highway Reconstruction,
15Perry Highway to Graham Road, Segments
160012 through 0050, Pine Township,
17Project ID 82254

 

18Project Allocation

517,000

19(Base Project Allocation - $517,000)

 

20(188) SR 4067, Pavement Reconstruction,
21Sample Road to Wildwood Road, Segments
220010/0000 through 0030/0000, Hampton
23Township, Project ID 82252

 

24Project Allocation

620,000

25(Base Project Allocation - $240,000)

 

26(Design & Contingencies - $380,000)

 

27(189) SR 0400, Highway Reconstruction, SR
280400 Tokay Street to Frankstown
29Avenue, Segments 0130 to 0150, City of
30Pittsburgh, Project ID 82262

 

1Project Allocation

423,000

2(Base Project Allocation - $423,000)

 

3(190) SR 0019, Highway Portion Bridge
4Rehabilitation, SR 0019 over Beaver
5Avenue Turnaround, City of Pittsburgh,
6Project ID 89122

 

7Project Allocation

24,072,000

8(Base Project Allocation -
9$22,842,000)

 

10(Design & Contingencies - $1,230,000)

 

11(191) SR 8082, Concrete Reconstruction,
12Highland Park Bridge Ramp E, O'Hara
13Township, Project ID 88450

 

14Project Allocation

40,000

15(Base Project Allocation - $40,000)

 

16(192) SR 0060 (I-376), Highway
17Reconstruction, SR 0060 (I-376) South,
18Segments 0240 to 0280, Robinson, Moon
19and North Fayette Townships, Project
20ID 78282

 

21Project Allocation

795,000

22(Base Project Allocation - $795,000)

 

23(193) I-376, Highway Reconstruction, I-
24376 Churchill Street to SR 0022, Penn
25Hills and Wilkins Townships and
26Churchill and Monroeville Boroughs,
27Project ID 89388

 

28Project Allocation

26,620,000

29(Base Project Allocation -
30$26,100,000)

 

1(Design & Contingencies - $520,000)

 

2(194) I-376, Highway Reconstruction, I-
3376 from Edgewood Street to Churchill
4Street, City of Pittsburgh, Braddock
5Hills, Churchill, Edgewood, Swissvale
6and Wilkinsburg Boroughs, Project ID
789385

 

8Project Allocation

20,520,000

9(Base Project Allocation -
10$20,500,000)

 

11(Design & Contingencies - $20,000)

 

12(195) I-376, Highway Reconstruction, I-
13376 from Bate Street to Edgewood
14Street, City of Pittsburgh, Edgewood
15and Swissvale Boroughs, Project ID
1689384

 

17Project Allocation

20,400,000

18(Base Project Allocation -
19$20,400,000)

 

20(196) SR 4028, Safety Improvement, River
21Road at SR 0065 and SR 4028, Glen
22Osborne Borough, Project ID 74997

 

23Project Allocation

518,000

24(Base Project Allocation - $474,000)

 

25(Design & Contingencies - $44,000)

 

26(197) SR 2031, Highway Portion Bridge
27Rehabilitation, SR 2031 over Long Run,
28White Oak Borough, Project ID 89129

 

29Project Allocation

2,706,000

30(Base Project Allocation - $2,367,000)

 

1(Design & Contingencies - $339,000)

 

2(198) SR 2015, Pavement Reconstruction,
3SR 2015 (Third Avenue) from Bayard to
4Market, Elizabeth Borough, Project ID
591849

 

6Project Allocation

1,600,000

7(Base Project Allocation - $1,200,000)

 

8(Design & Contingencies - $400,000)

 

9(199) SR 4036, Highway Portion Bridge
10Replacement, SR 4036 over Big
11Sewickley Creek, Braddock Hills
12Borough, Project ID 89117

 

13Project Allocation

1,696,000

14(Base Project Allocation - $714,000)

 

15(Design & Contingencies - $982,000)

 

16(200) SR 2031, Highway Portion Bridge
17Rehabilitation, SR 2031 (Lincoln Way)
18over Branch of Long Run, White Oak
19Borough, Project ID 89095

 

20Project Allocation

901,000

21(Base Project Allocation - $353,000)

 

22(Land Allocation - $18,000)

 

23(Design & Contingencies - $530,000)

 

24(201) SR 0079, Resurface, I-79, from SR
250910 to Butler County, Marshall
26Township, Project ID 88718

 

27Project Allocation

74,000

28(Land Allocation - $5,000)

 

29(Design & Contingencies - $69,000)

 

30(202) SR 0019, Safety Improvement, SR

 

10121 Cochran Road/Beverly Road, Mount
2Lebanon Township, Project ID 88476

 

3Project Allocation

1,320,000

4(Base Project Allocation - $1,320,000)

 

5(203) SR 0051, Highway Reconstruction, SR
68037 to Beaver Street, Pleasant Hills
7and Baldwin Boroughs, Project ID 88454

 

8Project Allocation

300,000

9(Base Project Allocation - $300,000)

 

10(204) SR 3052, Highway Reconstruction,
11Collier Township Line to Thoms Run,
12Segments 0010 through 0060/2289,
13Collier Township, Project ID 82222

 

14Project Allocation

1,183,000

15(Base Project Allocation - $1,183,000)

 

16(205) I-376, Highway Reconstruction, I-
17376 End of Fort Pitt Bridge to Bates
18Street, City of Pittsburgh, Project ID
1989382

 

20Project Allocation

9,820,000

21(Base Project Allocation - $9,800,000)

 

22(Design & Contingencies - $20,000)

 

23(206) SR 1028, Highway Portion Bridge
24Replacement, SR 1031 over Lardintown
25Run, Fawn Township, Project ID 63356

 

26Project Allocation

376,000

27(Base Project Allocation - $141,000)

 

28(Land Allocation - $36,000)

 

29(Design & Contingencies - $199,000)

 

30(207) SR 4011, Highway Reconstruction,

 

1Wexford Bayne Road to Big Sewickley
2Creek Road, Segments 0240 through
30240/3278, Franklin Park Borough,
4Project ID 82227

 

5Project Allocation

202,000

6(Base Project Allocation - $202,000)

 

7(208) SR 2090, Safety Improvement, SR
82090 Webster Road at SR 2057 Logans
9Ferry Road and SR 2090 Webster Road at
10SR 0366 Greensburg Road, Plum Borough,
11Project ID 91583

 

12Project Allocation

7,450,000

13(Base Project Allocation - $4,000,000)

 

14(Land Allocation - $3,000,000)

 

15(Design & Contingencies - $450,000)

 

16(209) I-376, Highway Reconstruction, I-
17376 Fort Pitt Tunnel to End of Fort
18Pitt Bridge, City of Pittsburgh,
19Project ID 91567

 

20Project Allocation

5,886,000

21(Base Project Allocation - $5,800,000)

 

22(Design & Contingencies - $86,000)

 

23(210) I-79, Highway Reconstruction, I-79,
24Washington County Line to Bridgeville
25Borough, South Fayette Township,
26Bridgeville Borough, Project ID 91566

 

27Project Allocation

1,140,000

28(Base Project Allocation - $1,000,000)

 

29(Design & Contingencies - $140,000)

 

30(211) I-79, Highway Reconstruction, I-79

 

1from Moon Run to Neville Island,
2Robinson and Kennedy Townships,
3Project ID 91565

 

4Project Allocation

831,000

5(Base Project Allocation - $733,000)

 

6(Design & Contingencies - $98,000)

 

7(212) SR 0028, Concrete Reconstruction,
8SR 0028 from O'Hara Township Line to
9Exit 13, O'Hara Township, Aspinwall
10Borough, Project ID 75682

 

11Project Allocation

1,600,000

12(Base Project Allocation - $1,600,000)

 

13(213) I-376, Highway Reconstruction, I-
14376 from I-79 to Carnegie Interchange,
15Collier, Robinson and Scott Townships,
16Carnegie and Rosslyn Farms Boroughs,
17Project ID 91563

 

18Project Allocation

905,000

19(Base Project Allocation - $775,000)

 

20(Design & Contingencies - $130,000)

 

21(214) SR 0910, Highway Reconstruction, SR
220910 from Mountain View Road to Cedar
23Run, West Deer and Indiana Townships,
24Project ID 88449

 

25Project Allocation

300,000

26(Base Project Allocation - $300,000)

 

27(215) SR 1034, Highway Portion Bridge
28Replacement, SR 1034 over Bull Creek,
29Fawn Township, Project ID 63513

 

30Project Allocation

955,000

1(Base Project Allocation - $501,000)

 

2(Land Allocation - $92,000)

 

3(Design & Contingencies - $362,000)

 

4(216) SR 2114, Highway Portion Bridge
5Preservation, SR 2114 over the
6Monongahela River, City of Duquesne
7and City of McKeesport, Project ID
863583

 

9Project Allocation

895,000

10(Base Project Allocation - $779,000)

 

11(Design & Contingencies - $116,000)

 

12(217) SR 0079, Safety Improvements, SR
130376, SR 0279, SR 0079, SR 0028 and SR
140022 Corridors, Various Municipalities
15in Allegheny, Beaver and Lawrence
16Counties, Project ID 69056

 

17Project Allocation

173,000

18(Base Project Allocation - $173,000)

 

19(218) SR 3069, Highway Reconstruction, SR
203069 from Liberty Bridge over the
21Monogahela River to SR 0051, City of
22Pittsburgh, Project ID 74153

 

23Project Allocation

8,347,000

24(Base Project Allocation - $5,313,000)

 

25(Land Allocation - $100,000)

 

26(Design & Contingencies - $2,934,000)

 

27(219) SR 0376, Reconfigure Interchange,
28I-376 Greentree Interchange at
29Greentree and Poplar Street, Greentree
30Borough, City of Pittsburgh, Project

 

1ID 97029

 

2Project Allocation

5,431,000

3(Base Project Allocation - $5,247,000)

 

4(Land Allocation - $184,000)

 

5(220) SR 3048, Highway Portion Bridge
6Replacement, SR 3048 over Branch
7Robinson Run, North Fayette Township,
8Project ID 74330

 

9Project Allocation

1,174,000

10(Base Project Allocation - $587,000)

 

11(Design & Contingencies - $587,000)

 

12(221) I-376, Highway Reconstruction, I-
13376 from Carnegie Borough to Fort Pitt
14Tunnel, Scott Township, City of
15Pittsburgh, Carnegie and Greentree
16Boroughs, Project ID 91564

 

17Project Allocation

2,540,000

18(Base Project Allocation - $2,180,000)

 

19(Design & Contingencies - $360,000)

 

20(222) I-79, Highway Reconstruction, I-79
21Bridgeville Borough to Campbells Run
22Road, Collier Township, Bridgeville
23Borough, Scott and Robinson Townships,
24Carnegie Borough, Project ID 87751

 

25Project Allocation

4,030,000

26(Base Project Allocation - $3,930,000)

 

27(Design & Contingencies - $100,00)

 

28(223) SR 8082, Concrete Reconstruction,
29Highland Park Bridge Ramp G, O'Hara
30Township, Project ID 88453

 

1Project Allocation

40,000

2(Base Project Allocation - $40,000)

 

3(224) I-376, Highway Reconstruction, I-
4376 from Edgewood Avenue to Churchill
5Road, City of Pittsburgh, Braddock
6Hills, Churchill, Edgewood, Swissvale
7and Wilkinsburg Boroughs, Project ID
887767

 

9Project Allocation

2,083,000

10(Base Project Allocation - $1,825,000)

 

11(Design & Contingencies - $258,000)

 

12(225) I-376, Highway Reconstruction, I-
13376 from Business 60 to Tonidale
14Interchange, Robinson, Findlay, Moon
15and North Fayette Townships, Project
16ID 87765

 

17Project Allocation

982,000

18(Base Project Allocation - $850,000)

 

19(Design & Contingencies - $132,000)

 

20(226) SR 0376, Concrete Rehabilitation,
21I-376 from Beaver County to Pittsburgh
22International Airport, Findlay and
23Moon Townships, Project ID 87764

 

24Project Allocation

8,980,000

25(Base Project Allocation - $8,980,000)

 

26(227) SR 0079, Highway Portion Bridge
27Painting, SR 0079 Neville Island,
28Glenfield Borough, Neville and
29Robinson Townships, Project ID 87756

 

30Project Allocation

821,000

1(Base Project Allocation - $709,000)

 

2(Design & Contingencies - $112,000)

 

3(228) SR 6279, Concrete Pavement
4Restoration, SR 6279, Veteran's Bridge
5to Perrysville (SR 0019), City of
6Pittsburgh, Project ID 87772

 

7Project Allocation

18,418,000

8(Base Project Allocation -
9$15,649,000)

 

10(Design & Contingencies - $2,769,000)

 

11(229) I-376, Highway Reconstruction, I-
12376, Fort Pitt Bridge to Bates Street,
13City of Pittsburgh, Project ID 87754

 

14Project Allocation

375,000

15(Base Project Allocation - $330,000)

 

16(Design & Contingencies - $45,000)

 

17(230) I-279, Highway Reconstruction, I-
18279 Fort Duquesne Bridge, City of
19Pittsburgh, Project ID 87773

 

20Project Allocation

4,675,000

21(Base Project Allocation - $4,030,000)

 

22(Design & Contingencies - $645,000)

 

23(231) SR 0079, Pavement Reconstruction
24and Rehabilitation, I-79, Marshall
25Township, Project ID 87746

 

26Project Allocation

1,702,000

27(Base Project Allocation - $1,476,000)

 

28(Design & Contingencies - $226,000)

 

29(232) SR 0065, Reconstruction, Ohio River
30Boulevard from Fort Duquesne to

 

1Kendall Avenue, City of Pittsburgh,
2Project ID 79448

 

3Project Allocation

2,600,000

4(Base Project Allocation - $2,600,000)

 

5(233) SR 3038, Safety Improvement, US
6Route 19 and SR 3038, Connor/Gilkenson
7Roads, Mount Lebanon Township, Project
8ID 79688

 

9Project Allocation

233,000

10(Base Project Allocation - $233,000)

 

11(234) SR 0286, Highway Reconstruction, SR
120286 from Old Frankstown Road/Sagamore
13Road to just North of Presque Isle
14Drive/Sandune Drive Approximately 2.02
15Miles, Monroeville and Plum Boroughs,
16Project ID 80508

 

17Project Allocation

15,218,000

18(Base Project Allocation - $9,338,000)

 

19(Land Allocation - $2,421,000)

 

20(Design & Contingencies - $3,459,000)

 

21(235) SR 3005, Highway Reconstruction, SR
223005 from Washington County Line to
23Chartiers Street, South Fayette and
24Upper Saint Clair Townships, Project
25ID 82219

 

26Project Allocation

998,000

27(Base Project Allocation - $998,000)

 

28(236) SR 0065, Highway Reconstruction, SR
290065 Ohio River Boulevard from Walnut
30Street to Rapp Street, Edgeworth,

 

1Leetsdale and Sewickley Boroughs,
2Project ID 91591

 

3Project Allocation

1,470,000

4(Base Project Allocation - $1,100,000)

 

5(Design & Contingencies - $370,000)

 

6(237) I-376, Highway Reconstruction, SR
70376, Bates Street to Edgewood Avenue,
8City of Pittsburgh, Braddock Hills,
9Edgewood and Swissvale Boroughs,
10Project ID 87755

 

11Project Allocation

1,330,000

12(Base Project Allocation - $1,140,000)

 

13(Design & Contingencies - $190,000)

 

14(238) SR 0148, Highway Reconstruction, SR
150148 Lysle Boulevard from Walnut
16Street to Fifth Avenue, City of
17McKeesport, Project ID 88277

 

18Project Allocation

400,000

19(Base Project Allocation - $400,000)

 

20(239) SR 0130, Highway Reconstruction and
21Rehabilitation, Jewel Way to
22Westmoreland County Line, Monroeville,
23Pitcairn and Trafford Boroughs,
24Project ID 88445

 

25Project Allocation

200,000

26(Base Project Allocation - $200,000)

 

27(240) SR 0065, Highway Reconstruction, SR
280065, Ohio River Boulevard from Termon
29Avenue (McKees Rocks Bridge) to
30Elizabeth Avenue and from Locust

 

1Street to Hiland Avenue, Avalon,
2Bellevue, Ben Avon and Emsworth
3Boroughs, City of Pittsburgh, Project
4ID 88443

 

5Project Allocation

106,000

6(Design & Contingencies - $106,000)

 

7(241) SR 0051, Highway Reconstruction, SR
80051 from Chiri Drive to North Fayette
9Township Line, City of Pittsburgh,
10McKees Rocks Borough, Stowe, Kennedy
11and Robinson Townships, Project ID
1288442

 

13Project Allocation

1,400,000

14(Base Project Allocation - $1,400,000)

 

15(242) SR 0030, Highway Reconstruction, SR
160030 Chiri Drive, North Fayette
17Township, Project ID 88441

 

18Project Allocation

50,000

19(Base Project Allocation - $50,000)

 

20(243) SR 0019, Highway Reconstruction, SR
210019 from Longvue Avenue to Brown
22Road, McCandless and Pine Townships,
23Project ID 88438

 

24Project Allocation

600,000

25(Base Project Allocation - $600,000)

 

26(244) I-376, Highway Reconstruction, I-
27376 Old 22, from Tonidale Interchange
28to McMichael Road, Robinson Township,
29Project ID 87768

 

30Project Allocation

1,191,000

1(Base Project Allocation - $1,040,000)

 

2(Design & Contingencies - $151,000)

 

3(245) SR 2094, Highway Reconstruction, SR
42094 Fifth Avenue, from Jerome Street
5Bridge to SR 0148, City of McKeesport,
6Project ID 88280

 

7Project Allocation

3,000,000

8(Base Project Allocation - $3,000,000)

 

9(246) SR 3035, Highway Reconstruction, SR
103035 (Weyman Road) from Baptist Road
11to Provost Road, Whitehall Borough,
12Project ID 82221

 

13Project Allocation

2,940,000

14(Base Project Allocation - $2,440,000)

 

15(Design & Contingencies - $500,000)

 

16(247) I-579, Highway Reconstruction, I-
17579 from SR 3069 to before Veterans
18Bridge Crossing Allegheny River, City
19of Pittsburgh, Project ID 87780

 

20Project Allocation

786,000

21(Base Project Allocation - $674,000)

 

22(Design & Contingencies - $112,00)

 

23(248) I-376, Highway Reconstruction, I-
24376 Churchill Road to SR 0022,
25Churchill Borough, Wilkins and Penn
26Hills Townships, Monroeville Borough,
27Project ID 87779

 

28Project Allocation

4,545,000

29(Base Project Allocation - $3,825,000)

 

30(Design & Contingencies - $720,000)

 

1(249) I-376, Highway Reconstruction, I-
2376 SR 0022 to Churchill Road,
3Churchill Borough, Wilkins and Penn
4Hills Townships, Monroeville Borough,
5Project ID 87778

 

6Project Allocation

3,915,000

7(Base Project Allocation - $3,285,000)

 

8(Design & Contingencies - $630,000)

 

9(250) SR 0022, Highway Reconstruction, SR
100022 from Tonidale Interchange to
11McMichael Road, Robinson Township,
12Project ID 87776

 

13Project Allocation

1,495,000

14(Base Project Allocation - $1,300,000)

 

15(Design & Contingencies - $195,000)

 

16(251) SR 0376, Highway Restoration, from
17Airport Interchange to Business I-376,
18Findlay and Moon Townships, Project ID
1987775

 

20Project Allocation

6,436,000

21(Base Project Allocation - $6,436,000)

 

22(252) I-279, Highway Reconstruciton, I-
23279 from Camp Horne Road to Wexford
24Road, Ross and Ohio Townships,
25Franklin Park Borough, Project ID
2687774

 

27Project Allocation

3,070,000

28(Base Project Allocation - $2,600,000)

 

29(Design & Contingencies - $470,000)

 

30(253) SR 0022, Highway Portion Bridge

 

1Preservation, SR 0022 over Potato
2Garden Road, Findlay and North Fayette
3Townships, Project ID 88393

 

4Project Allocation

418,000

5(Base Project Allocation - $179,000)

 

6(Land Allocation - $30,000)

 

7(Design & Contingencies - $209,000)

 

8(254) SR 0019, Safety Improvement, SR
90019 at Sewickley Oakmont Road, Pine
10and Ross Townships, Project ID 98086

 

11Project Allocation

190,000

12(Base Project Allocation - $190,000)

 

13(255) 0279, Interchange Improvement, I-
14279 North Southbound from Union Avenue
15Exit, Ross Township, Project ID 98092

 

16Project Allocation

190,000

17(Base Project Allocation - $190,000)

 

18(256) New Roadway, New Roadway
19Construction, in the Area Bounded by
20Crawford Street to the East,
21Washington Place to the West, Bedford
22Avenue to the North and Centre Avenue
23to the South, City of Pittsburgh,
24Project ID 97843

 

25Project Allocation

11,880,000

26(Base Project Allocation -
27$11,880,000)

 

28(257) SR 0136, Highway Portion Bridge
29Preservation, SR 0136 over the
30Monongahela River, Forward Township,

 

1Project ID 97948

 

2Project Allocation

441,000

3(Base Project Allocation - $367,000)

 

4(Design & Contingencies - $74,000)

 

5(258) SR 0376, Congestion Reduction, I-
6376 Parkway West from Robinson
7Township Center Exit to Ridge Avenue
8(Settlers Ridge), North Fayette and
9Robinson Townships, Project ID 98093

 

10Project Allocation

190,000

11(Base Project Allocation - $190,000)

 

12(259) SR 0837, Rehabilitation, Resurface,
13SR 0837 from Station Square to
14Steelers Practice Field (UPMC Sports
15Performance Complex, after South 33rd
16Street), City of Pittsburgh, Project
17ID 98085

 

18Project Allocation

1,160,000

19(Base Project Allocation - $1,000,000)

 

20(Land Allocation - $10,000)

 

21(Design & Contingencies - $150,000)

 

22(260) SR 0376, Tunnel Repair, Fort Pitt
23Tunnel, City of Pittsburgh, Project ID
2497908

 

25Project Allocation

381,000

26(Base Project Allocation - $340,000)

 

27(Design & Contingencies - $41,000)

 

28(261) SR 0279, Interchange Improvement,
29I-279 North at I-579 Merge, City of
30Pittsburgh, Project ID 98091

 

1Project Allocation

190,000

2(Base Project Allocation - $190,000)

 

3(262) Gill Hall Road, Resurface, Gill
4Hall Road from Stone Church Road to
5Cochran Mill Road, Jefferson Hills
6Borough, Project ID 100875

 

7Project Allocation

405,000

8(Base Project Allocation - $405,000)

 

9(263) SR 3038, Resurface, SR 3038 from
10Painters Run Road to Washington Road,
11Mount Lebanon Township, Project ID
12100882

 

13Project Allocation

199,000

14(Base Project Allocation - $199,000)

 

15(264) SR 3030, Resurface, SR 3038 from
16Painters Run Road to Library Road,
17Bethel Park Borough, Lebanon Township,
18Project ID 100881

 

19Project Allocation

546,000

20(Base Project Allocation - $546,000)

 

21(265) Scott Road, Resurface, Scott Road
22from Castle Shannon Boulevard to
23Washington Road, Mount Lebanon
24Township, Dormont Borough, Project ID
25100880

 

26Project Allocation

625,000

27(Base Project Allocation - $625,000)

 

28(266) SR 3033, Resurface, Tate Route 3033
29from Vanadium Road to Bower Hill Road,
30Mount Lebanon Township, Project ID

 

1100879

 

2Project Allocation

285,000

3(Base Project Allocation - $285,000)

 

4(267) SR 3031, Resurface, SR 3031 from
5Washington Road to Hilltop Road,
6Collier Township and Bridgeville
7Borough, Project ID 100878

 

8Project Allocation

304,000

9(Base Project Allocation - $304,000)

 

10(268) Cowan Road, Resurface, Cowan Road
11from Baldwin Road to McMichael Road,
12Collier Township, Project ID 100883

 

13Project Allocation

495,000

14(Base Project Allocation - $495,000)

 

15(269) SR 3020, Resurface, SR 3020 from
16Clifton Road to Church Hill Road,
17Bethel Park Borough, Project ID 100876

 

18Project Allocation

507,000

19(Base Project Allocation - $507,000)

 

20(270) Greggs Station Road, Resurface,
21Greggs Station Road from Greggs
22Station Road, Collier Township,
23Project ID 100888

 

24Project Allocation

400,000

25(Base Project Allocation - $400,000)

 

26(271) SR 3016, Resurface, SR 3016 from
27Piney Fork Road to Snowden Road, South
28Park Township, Project ID 100874

 

29Project Allocation

835,000

30(Base Project Allocation - $835,000)

 

1(272) SR 3028, Resurface, SR 3028 from
2Millers Run Road to Noblestown Road,
3South Fayette Township, Project ID
4100877

 

5Project Allocation

278,000

6(Base Project Allocation - $278,000)

 

7(273) SR 3052, Resurface, SR 3052 from
8Thoms Run Road to East Railroad
9Street, Collier Township and
10Heidelberg Borough, Project ID 100884

 

11Project Allocation

540,000

12(Base Project Allocation - $540,000)

 

13(274) SR 3054, Resurface, SR 3054 from
14Pinkerton Run Road to Main Street,
15Collier Township and Carnegie Borough,
16Project ID 100885

 

17Project Allocation

620,000

18(Base Project Allocation - $620,000)

 

19(275) Snowden Road, Resurface, Snowden
20Road from Stone Church Road to the
21Bridge over Lick Run, South Park
22Township and Jefferson Hills Borough,
23Project ID 100873

 

24Project Allocation

340,000

25(Base Project Allocation - $340,000)

 

26(276) Oakdale Road, Resurface, Oakdale
27Road from North Branch Road to Old
28Lincoln Highway, North Fayette
29Township, Project ID 100887

 

30Project Allocation

208,000

1(Base Project Allocation - $208,000)

 

2(277) SR 2080, Resurface, SR 2080 from
3Allegheny River Boulevard to Hamill
4Road, Verona and Oakmount Boroughs and
5Penn Hills Township, Project ID 100865

 

6Project Allocation

318,000

7(Base Project Allocation - $318,000)

 

8(278) SR 0019, Resurface, West Liberty
9Avenue from Port Authority Bus Way to
10the Liberty Tunnel, City of
11Pittsburgh, Project ID 100889

 

12Project Allocation

275,000

13(Base Project Allocation - $275,000)

 

14(279) SR 3074, Resurface, SR 3074 from
15Beaver Grade Road to Montour Run, Moon
16Township, Project ID 100890

 

17Project Allocation

442,000

18(Base Project Allocation - $442,000)

 

19(280) Ewings Mill Road, Resurface, Ewings
20Mill Road from Franklin Place to the
21Bridge over Montour Run, Moon
22Township, Project ID 100891

 

23Project Allocation

488,000

24(Base Project Allocation - $488,000)

 

25(281) Beaver Grade Road, Resurface,
26Beaver Grade Road from Steubenville
27Pike to Clever Road, Robinson
28Township, Project ID 100892

 

29Project Allocation

171,000

30(Base Project Allocation - $171,000)

 

1(282) Burgettstown Road, Resurface,
2Burgettstown Road to Lincoln Highway,
3Findlay Township, Project ID 100893

 

4Project Allocation

500,000

5(Base Project Allocation - $500,000)

 

6(283) Mansfield Avenue, Resurface,
7Mansfield Avenue from Noblestown Road
8to Poplar Street, Greentree Borough,
9Project ID 100886

 

10Project Allocation

645,000

11(Base Project Allocation - $645,000)

 

12(284) Allegheny Avenue, Resurface,
13Allegheny Avenue from Plum Street to
14Hulton Road, Oakmont Borough, Project
15ID 100859

 

16Project Allocation

624,000

17(Base Project Allocation - $624,000)

 

18(285) SR 2037, Resurface, SR 2037 from
19State Street to Port Perry Road, White
20Oak Borough, North Versailles
21Township, Project ID 100848

 

22Project Allocation

402,000

23(Base Project Allocation - $402,000)

 

24(286) SR 2049, Resurface, SR 2049 from
25Greensprings Avenue to Maple Street,
26West Mifflin Borough, Project ID
27100849

 

28Project Allocation

750,000

29(Base Project Allocation - $750,000)

 

30(287) SR 2051, Resurface, Brinton Road

 

1from Dinell Drive to Brinton Road,
2Forest Hills, Edgewood and Braddock
3Hills Boroughs, Project ID 100850

 

4Project Allocation

202,000

5(Base Project Allocation - $202,000)

 

6(288) SR 2053, Resurface, Rodi Road from
7Larimer Avenue to William Penn
8Highway, Churchill Borough, Wilkins
9Township, Project ID 100851

 

10Project Allocation

148,000

11(Base Project Allocation - $148,000)

 

12(289) School Street, Resurface, School
13Street from Lott Street to Reiter
14Road, Penn Hills Township, Project ID
15100852

 

16Project Allocation

215,000

17(Base Project Allocation - $215,000)

 

18(290) SR 2057, Resurface Haymaker Road
19from Mosside Boulevard to Beatty Road,
20Monroeville Borough, Project ID 100853

 

21Project Allocation

450,000

22(Base Project Allocation - $450,000)

 

23(291) Hulton Road, Resurface, Hulton Road
24from Indiana Road to Coxcomb Hill
25Road, Penn Hills Township and Plum
26Borough, Project 100854

 

27Project Allocation

271,000

28(Base Project Allocation - $271,000)

 

29(292) SR 2058, Hulton Road, Resurface,
30Hulton Road from SR 2074 to Morath

 

1Lane, Penn Hills Township and Plum
2Borough, Project ID 100855

 

3Project Allocation

845,000

4(Base Project Allocation - $845,000)

 

5(293) Jefferson Road, Resurface,
6Jefferson Road from Old William Penn
7Highway to Lougeay Road, Penn Hills
8Township, Project ID 100856

 

9Project Allocation

250,000

10(Base Project Allocation - $250,000)

 

11(294) SR 2074, Resurface, SR 2074 (Hulton
12Road) from Second Street to SR 9106,
13Plum and Oakmont Boroughs, Project ID
14100867

 

15Project Allocation

500,000

16(Base Project Allocation - $500,000)

 

17(295) SR 2066, Resurface, SR 2066 from
18Main Street to Davidson Road,
19Monroeville and Plum Boroughs, Penn
20Hills Township, Project ID 100858

 

21Project Allocation

223,000

22(Base Project Allocation - $223,000)

 

23(296) Stolz Road, Resurface, Stolz Road
24from Library Road to Stewart Road,
25Bethel Park Borough, Southpark
26Township, Project ID 100872

 

27Project Allocation

210,000

28(Base Project Allocation - $210,000)

 

29(297) SR 2074, Resurface, SR 2074 from
30Poketa Road to Milltown Road, Penn

 

1Hills Borough, Project ID 100860

 

2Project Allocation

392,000

3(Base Project Allocation - $392,000)

 

4(298) New Texas Road, Resurface, New
5Texas Road from Logan Ferry Road to
6Saltsburg Road, Monroeville and Plum
7Boroughs, Penn Hills Township, Project
8ID 100861

 

9Project Allocation

840,000

10(Base Project Allocation - $840,000)

 

11(299) New Texas Road, Resurface, New
12Texas Road from Logan Ferry Road to
13Golden Mill Highway, Monroeville and
14Plum Boroughs and Penn Hills Township,
15Project ID 100862

 

16Project Allocation

490,000

17(Base Project Allocation - $490,000)

 

18(300) Leechburg Road, Resurface,
19Leechburg Road from Ross Hollow Road
20to Logans Ferry Road, Plum Borough,
21Project ID 100863

 

22Project Allocation

520,000

23(Base Project Allocation - $520,000)

 

24(301) SR 2078, Resurface, SR 2078 from
25Saltsburg Road to Indiana Road, Penn
26Hills Township, Project ID 100864

 

27Project Allocation

940,000

28(Base Project Allocation - $940,000)

 

29(302) Rochester Road, Resurface,
30Rochester Road from Ross Township Line

 

1to McAleer Road, McCandless Township,
2Franklin Borough, Project ID 100898

 

3Project Allocation

334,000

4(Base Project Allocation - $334,000)

 

5(303) Old Northern Pike, Resurface, Old
6Northern Pike from Monroeville
7Boulevard to Northern Pike,
8Monroeville Borough, Project ID 100866

 

9Project Allocation

200,000

10(Base Project Allocation - $200,000)

 

11(304) Spring Run Extension, Resurface,
12Spring Run Extension from Gringo
13Clinton Road to Spring Run Extension,
14Findlay Township, Project ID 100894

 

15Project Allocation

510,000

16(Base Project Allocation - $510,000)

 

17(305) Webster Road, Resurface, Webster
18Road from Logans Ferry Road to
19Greensburg Road, Plum Borough, Project
20ID 100870

 

21Project Allocation

254,000

22(Base Project Allocation - $254,000)

 

23(306) Frey Road, Resurface, Frey Road
24from Thompson Run Road to Universal
25Road, Penn Hills Township, Project ID
26100857

 

27Project Allocation

845,000

28(Base Project Allocation - $845,000)

 

29(307) SR 3009, Safety Improvement, Drake
30Road, Bethel Park Borough, Project ID

 

1100977

 

2Project Allocation

50,000

3(Base Project Allocation - $50,000)

 

4(308) McMurray, Bethel and Drake Roads,
5Safety Improvement, McMurray, Bethel
6and Drake Roads, Upper Saint Clair
7Township, Project ID 100965

 

8Project Allocation

100,000

9(Base Project Allocation - $100,000)

 

10(309) SR 0019, Safety Improvement,
11Additional Lanes on Washington Road
12(SR 0019), Upper Saint Clair Township,
13Project ID 100966

 

14Project Allocation

50,000

15(Base Project Allocation - $50,000)

 

16(310) SR 0088, Safety Improvement,
17Library Road (SR 0088) and King School
18Road Intersection, Bethel Park
19Borough, Project ID 100967

 

20Project Allocation

291,000

21(Base Project Allocation - $240,000)

 

22(Design & Contingencies - $51,000)

 

23(311) SR 3009, Safety Improvement
24Additional Center Lane, Brightwood
25Road to Chestnut Street, Bethel Park
26Township, Project ID 100968

 

27Project Allocation

2,700,000

28(Base Project Allocation - $2,400,000)

 

29(Design & Contingencies - $300,000)

 

30(312) SR 3010, Safety Improvement, Logan

 

1Road, Irishtown Road and Patterson
2Road, Bethel Park Borough, Project ID
3100969

 

4Project Allocation

100,000

5(Base Project Allocation - $100,000)

 

6(313) SR 3010, Add Turning Lane Safety
7Improvement, Bethel Church Road and
8Logan Road (SR 3010), Bethel Park
9Borough, Project ID 100970

 

10Project Allocation

50,000

11(Base Project Allocation - $50,000)

 

12(314) SR 3009, Safety Improvement, SR
133009 (South Park) and SR 3010 (Logan
14Road), Bethel Park Borough, Project ID
15100971

 

16Project Allocation

1,500,000

17(Base Project Allocation - $1,500,000)

 

18(315) SR 3009, Highway Resurfacing, SR
193009 (South Park Road) from Brightwood
20Road to Logan Road, Bethel Park
21Borough, Project ID 100973

 

22Project Allocation

600,000

23(Base Project Allocation - $600,000)

 

24(316) SR 3009, Safety Improvement, SR
253009 - Church Road, Bethel Park
26Borough, Project ID 100974

 

27Project Allocation

75,000

28(Base Project Allocation - $75,000)

 

29(317) Evergreen Road, Resurface,
30Evergreen Road from Babcock Boulevard

 

1to McKnight Road, Ross Township, City
2of Pittsburgh, Project ID 100896

 

3Project Allocation

420,000

4(Base Project Allocation - $420,000)

 

5(318) Mesta Street, Safety Improvement,
6Mesta Street, Bethel Park Borough,
7Project ID 100976

 

8Project Allocation

50,000

9(Base Project Allocation - $50,000)

 

10(319) SR 0136, Highway Portion Bridge
11Preservation, City of Monongahela
12Bridge over SR 0837, the Monongahela
13River and Railroad, Forward Township,
14Project ID 100957

 

15Project Allocation

240,000

16(Base Project Allocation - $240,000)

 

17(320) SR 2040, Safety Improvement,
18Library Road and Bethel Church/
19Broughton Road (SR 2040), Bethel Park
20Borough, Project ID 100978

 

21Project Allocation

100,000

22(Base Project Allocation - $100,000)

 

23(321) SR 0088, Safety Improvement,
24Library Road-Old Bethel Church/Horning
25Road, Bethel Park Borough, Project ID
26100979

 

27Project Allocation

50,000

28(Base Project Allocation - $50,000)

 

29(322) Baptist Road, Add Turning Lane,
30Baptist Road at Higbee Drive and

 

1Horning Road, Bethel Park Borough,
2Project ID 100980

 

3Project Allocation

100,000

4(Base Project Allocation - $100,000)

 

5(323) SR 3004, Roadway Widening,
6McMurrary Road between Clifton Road
7and South Park Road, Bethel Park
8Borough and Upper Saint Clair
9Township, Project ID 100981

 

10Project Allocation

390,000

11(Base Project Allocation - $390,000)

 

12(324) Black Hawk Drive, Add Turning Lane,
13Black Hawk Drive, Bethel Park Borough,
14Project ID 100982

 

15Project Allocation

100,000

16(Base Project Allocation - $100,000)

 

17(325) McMurray Road, Add Turning Lane,
18McMurray Road and on Limestone Drive,
19Bethel Park Borough, Project ID 100983

 

20Project Allocation

100,000

21(Base Project Allocation - $100,000)

 

22(326) SR 2040, Safety Improvement,
23Broughton Road (SR 2040) and Paxton
24Drive in Bethel Park, Bethel Park
25Borough, Project ID 100984

 

26Project Allocation

100,000

27(Base Project Allocation - $100,000)

 

28(327) SR 0088, Safety Improvement,
29Library Road at Logan Road, Bethel
30Park Borough, Project ID 100985

 

1Project Allocation

291,000

2(Base Project Allocation - $240,000)

 

3(Design & Contingencies - $51,000)

 

4(328) I-376, Safety Improvements, Parkway
5East Corridor Transportation Network
6Upgrades and Modifications on I-376,
7Various Municipalities, Project ID
8100986

 

9Project Allocation

10,000,000

10(Base Project Allocation -
11$10,000,000)

 

12(329) SR 0088, Realignment, Library Road
13and Milford Dive, Bethel Park Borough,
14Project ID 100975

 

15Project Allocation

100,000

16(Base Project Allocation - $100,000)

 

17(330) Hitzel Road, Resurface, Hitzel Hill
18Road from Camp Meeting Road to Big
19Sewickley Road, Bell Acres Borough,
20Project ID 100907

 

21Project Allocation

475,000

22(Base Project Allocation - $475,000)

 

23(331) McKee Road, Resurface, McKee Road
24from Jacks Run Road to Lincoln
25Highway, White Oak Borough, North
26Versailles Township, Project ID 100847

 

27Project Allocation

272,000

28(Base Project Allocation - $272,000)

 

29(332) SR 4011, Resurface, SR 4011 from
30Evergreen Road to Perry Highway, Ross

 

1Township, Project ID 100897

 

2Project Allocation

392,000

3(Base Project Allocation - $392,000)

 

4(333) SR 2026, Resurface, SR 2026 from
5McKeesport Boulevard to Station
6Street, North Versailles Township and
7Wilmerding Borough, Project ID 100843

 

8Project Allocation

960,000

9(Base Project Allocation - $960,000)

 

10(334) Siebert Road, Resurface, Siebert
11Road from Babcock Boulevard to
12Thompson Run Road, Ross Township,
13Project ID 100899

 

14Project Allocation

197,000

15(Base Project Allocation - $197,000)

 

16(335) SR 4021, Resurface, SR 4021 from
17Plaza Entrance Road to Camp Horne
18Road, Ohio Township, Project ID 100900

 

19Project Allocation

202,000

20(Base Project Allocation - $202,000)

 

21(336) Sewickley Oakmont Road, Resurface,
22Sewickley Oakmont Road from Rochester
23Road to Perry Highway, Ross Township,
24Project ID 100901

 

25Project Allocation

637,000

26(Base Project Allocation - $637,000)

 

27(337) Mount Nebo Road, Resurface, Mount
28Nebo Road from Ritter Road to Bear Run
29Drive, Ohio Township, Project ID
30100902

 

1Project Allocation

748,000

2(Base Project Allocation - $748,000)

 

3(338) Ferry Road, Resurface, Ferry Road
4from Merriman Road to Glenfield Road,
5Aleppo Township, Sewickley Heights
6Borough, Project ID 100903

 

7Project Allocation

770,000

8(Base Project Allocation - $770,000)

 

9(339) SR 4034, Resurface, SR 4034 from
10Fern Hollow Road to Magee Road,
11Franklin Park and Sewickley Hills
12Boroughs, Project ID 100904

 

13Project Allocation

268,000

14(Base Project Allocation - $268,000)

 

15(340) SR 3006, Safety Improvement
16Multiple Intersections, SR 3006 Boyce
17Road Corridor, Upper Saint Clair
18Township, Project ID 100964

 

19Project Allocation

2,300,000

20(Base Project Allocation - $2,000,000)

 

21(Design & Contingencies - $300,000)

 

22(341) SR 4043, Resurface, SR 4043 from
23the Bridge over Rippling Run to
24Warrendale Bayne Road, Franklin Park
25Borough, Project ID 100906

 

26Project Allocation

216,000

27(Base Project Allocation - $216,000)

 

28(342) Lesnett, McMillian and McLaughlin
29Run Road, Safety Improvement, Lesnett,
30McMillian and McLaughlin Run Road,

 

1Upper Saint Clair Township, Project ID
2100963

 

3Project Allocation

100,000

4(Base Project Allocation - $100,000)

 

5(343) Nicholson Road, Resurface,
6Nicholson Road from Mount Nebo Road to
7Bayne Wexford Road, Ohio Township,
8Franklin Park Borough, Project ID
9100908

 

10Project Allocation

586,000

11(Base Project Allocation - $586,000)

 

12(344) SR 4060, Resurface, SR 4060 from
13Mount Royal Boulevard to William Flynn
14Highway, Shaler Township, Project ID
15100909

 

16Project Allocation

181,000

17(Base Project Allocation - $181,000)

 

18(345) Bakerstown Road, Resurface,
19Bakerstown Road from Conrad Drive to
20Heckert Road, Richland and Pine
21Townships, Project ID 100910

 

22Project Allocation

809,000

23(Base Project Allocation - $809,000)

 

24(346) SR 4070, Resurface, SR 4070 from
25Kummer Road to Middle Road, McCandless
26and Hampton Townships, Project ID
27100911

 

28Project Allocation

656,000

29(Base Project Allocation - $656,000)

 

30(347) Wildwood Road, Resurface, Wildwood

 

1Road from West Hardies Road to William
2Flynn Highway, Hampton Township,
3Project ID 100912

 

4Project Allocation

880,000

5(Base Project Allocation - $880,000)

 

6(348) Ingomar Road, Resurface, Ingomar
7Road from Highland Road to US 19,
8McCandless Township, Project ID 100913

 

9Project Allocation

870,000

10(Base Project Allocation - $870,000)

 

11(349) SR 0028, Resurface, Ohio Street
12from Cedar Avenue to Chestnut Street,
13City of Pittsburgh, Project ID 100914

 

14Project Allocation

385,000

15(Base Project Allocation - $385,000)

 

16(350) SR 4084, Concrete Rehabilitation,
17SR 4084 from the West End to Chestnut
18Street, City of Pittsburgh, Project ID
19100915

 

20Project Allocation

1,300,000

21(Base Project Allocation - $1,300,000)

 

22(351) SR 0051 Clairton Boulevard, Highway
23Portion Bridge Preservation, Clairton
24Boulevard, SR 0051 over Lewis Run at
25Intersection of SR 2032, Pleasant
26Hills Borough, Project ID 100944

 

27Project Allocation

600,000

28(Base Project Allocation - $600,000)

 

29(352) Glass Run Road, Resurface, Glass
30Run Road from Mellott Road to Gensler

 

1Road, Baldwin Borough, Project ID
2100895

 

3Project Allocation

285,000

4(Base Project Allocation - $285,000)

 

5(353) SR 4039, Resurface, SR 4039 from
6Magee Road to Camp Meeting Road,
7Various Municipalities, Project ID
8100905

 

9Project Allocation

348,000

10(Base Project Allocation - $348,000)

 

11(354) SR 0051, Resurface, PA 51 (Saw Mill
12Run Boulevard) from Edgebrook Avenue
13to Warrenton Avenue, City of
14Pittsburgh, Project ID 100786

 

15Project Allocation

500,000

16(Base Project Allocation - $500,000)

 

17(355) PA 28, Reconstruction, PA 28 from
18the Millvale Borough Line to Highland
19Park, Various Municipalities, Project
20ID 100775

 

21Project Allocation

2,860,000

22(Base Project Allocation - $2,860,000)

 

23(356) PA 28, Reconstruction, PA 28 from
24Highland Park to Regional Industrial
25Development Corporation (RIDC) Park,
26Various Municipalities, Project ID
27100776

 

28Project Allocation

2,275,000

29(Base Project Allocation - $2,275,000)

 

30(357) PA 28, Reconstruction, PA 28 from

 

1Yutes Run to Bull Creek, Various
2Municipalities, Project ID 100777

 

3Project Allocation

2,392,000

4(Base Project Allocation - $2,392,000)

 

5(358) PA 28, Reconstruction, PA 28 from
6Bull Creek to the Butler County Line,
7Harrison and Fawn Townships and
8Tarentum Borough, Project ID 10078

 

9Project Allocation

3,965,000

10(Base Project Allocation - $3,965,000)

 

11(359) SR 0030, Resurface, Lincoln Highway
12from Lincoln Highway to Washington
13Road, Findlay Township, Project ID
14100779

 

15Project Allocation

356,000

16(Base Project Allocation - $356,000)

 

17(360) SR 0048, Resurface, PA 48 from
18Cowan Drive to Valley View Drive,
19Elizabeth Township, Project ID 100780

 

20Project Allocation

256,000

21(Base Project Allocation - $256,000)

 

22(361) SR 0048, Resurface, PA 48 from
23Boston Hollow Road to Olympia Shopping
24Center, Elizabeth Township, Project ID
25100781

 

26Project Allocation

162,000

27(Base Project Allocation - $162,000)

 

28(362) SR 0048, Resurface, Mosside
29Boulevard from PA 130 to Haymaker
30Road, Monroeville Borough, Project ID

 

1100782

 

2Project Allocation

320,000

3(Base Project Allocation - $320,000)

 

4(363) Jacks Run Road, Resurface, Jacks
5Run Road from Main Street to Poplar
6Street, White Oak Borough, Project ID
7100783

 

8Project Allocation

400,000

9(Base Project Allocation - $400,000)

 

10(364) SR 0065, Resurface, Ohio River
11Boulevard from Terrace Avenue to River
12Avenue Kilbuck Township, Emsworth and
13Glenfield Boroughs, Project ID 100796

 

14Project Allocation

600,000

15(Base Project Allocation - $600,000)

 

16(365) SR 0050, Resurface, Noblestown Road
17from School Street to Crafton
18Boulevard, Carnegie Borough and Scott
19Township, Project ID 100785

 

20Project Allocation

464,000

21(Base Project Allocation - $464,000)

 

22(366) PA 28, Reconstruction, PA 28 from
23Etna Bypass to Highland Park in Etna,
24Sharpsburg and Aspinwall Boroughs and
25O'Hara Township, Project ID 100772

 

26Project Allocation

940,000

27(Base Project Allocation - $940,000)

 

28(367) SR 0051, Add Turning Lane, PA 51
29(Saw Mill Run Boulevard) from Whited
30Street to Edgebrook Avenue, City of

 

1Pittsburgh, Project ID 100787

 

2Project Allocation

300,000

3(Base Project Allocation - $300,000)

 

4(368) SR 0051, Resurface, West Carson
5Street from PA 51 to Herbst Road, City
6of Pittsburgh, Project ID 100788

 

7Project Allocation

1,700,000

8(Base Project Allocation - $1,700,000)

 

9(369) SR 0051, Reconstruction, Saw Mill
10Run Boulevard from PA 88 (Library
11Road) to US 19, City of Pittsburgh,
12Project ID 100789

 

13Project Allocation

3,000,000

14(Base Project Allocation - $3,000,000)

 

15(370) SR 0051, Reconstruction, PA 51 from
16McKees Rocks Bridge to Station Street,
17Robinson Township, Project ID 100790

 

18Project Allocation

1,495,000

19(Base Project Allocation - $1,495,000)

 

20(371) SR 0051, Resurface, Stoops Ferry
21Road from Crooked Lane to Flaugherty
22Run Road, Moon and Crescent Townships,
23Project ID 100791

 

24Project Allocation

675,000

25(Base Project Allocation - $675,000)

 

26(372) Fourth Avenue, Resurface, Fourth
27Avenue from Vine Street to Stoops
28Ferry Road, Moon Township and
29Coraopolis Borough, Project ID 100792

 

30Project Allocation

600,000

1(Base Project Allocation - $600,000)

 

2(373) SR 0051, Resurface, PA 51 from
3Lebanon Church Road to Edgebrook
4Avenue, Various Municipalities,
5Project ID 100793

 

6Project Allocation

1,460,000

7(Base Project Allocation - $1,460,000)

 

8(374) SR 0051, Resurface, PA 51 from
9Lebanon Church Road to Edgebrook
10Avenue, Various Municipalities,
11Project ID 100794

 

12Project Allocation

1,460,000

13(Base Project Allocation - $1,460,000)

 

14(375) SR 2028, Resurface, Ridge Road from
15Gillhall Road to Jefferson Borough
16Line, Jefferson Hills Borough and City
17of Clairton, Project ID 100845

 

18Project Allocation

360,000

19(Base Project Allocation - $360,000)

 

20(376) PA 0050, Concrete Rehabilitation
21from Washington County Line to
22Miller's Run Road, South Fayette
23Township, Project ID 100784

 

24Project Allocation

2,900,000

25(Base Project Allocation - $2,900,000)

 

26(377) SR 0008, Resurface, PA 0008 from
27Murtland Street to Fifth Avenue,
28Wilkinsburg Borough, Project ID 100760

 

29Project Allocation

240,000

30(Base Project Allocation - $240,000)

 

1(378) SR 1015, Highway Portion Bridge
2Replacement, SR 1015 over Branch of
3Little Deer Creek, Indiana Township,
4Project ID 99687

 

5Project Allocation

2,000,000

6(Base Project Allocation - $2,000,000)

 

7(379) SR 0376, Safety Improvements,
8Congestion Reduction, I-376 between
9Downtown Pittsburgh and Monroeville,
10Parkway East Corridor Transportation
11Network, Various Municipalities,
12Project ID 99874

 

13Project Allocation

6,000,000

14(Base Project Allocation - $5,400,000)

 

15(Design & Contingencies - $600,000)

 

16(380) SR 0885, Safety Improvement, SR
170085, Bates Street from Boulevard of
18the Allies to Second Avenue, City of
19Pittsburgh, Project ID 98125

 

20Project Allocation

285,000

21(Base Project Allocation - $285,000)

 

22(381) SR 1019, Highway Portion Bridge
23Rehabilitation, SR 1019 from Butler
24Logan Road to Allegheny Valley
25Expressway, Frazer Township, Project
26ID 100648

 

27Project Allocation

1,601,000

28(Base Project Allocation - $1,601,000)

 

29(382) SR 2001, Highway Portion Bridge
30Replacement, SR 2001 over Tributary of

 

1Monongahela Road, Forward Township,
2Project ID 100657

 

3Project Allocation

200,000

4(Base Project Allocation - $200,000)

 

5(383) SR 3108, Highway Portion Bridge
6Rehabilitation, SR 3108 (North Branch
7Road) over North Branch of Robinson
8Run, North Fayette Township, Project
9ID 100702

 

10Project Allocation

270,000

11(Base Project Allocation - $270,000)

 

12(384) SR 4009, Highway Portion Bridge
13Preservation, SR 4009 (Evergreen Road)
14over Girtys Run, Milvale Borough,
15Project ID 100708

 

16Project Allocation

300,000

17(Base Project Allocation - $300,000)

 

18(385) SR 4043, Highway Portion Bridge
19Replacement, SR 4043 over Rippling
20Run, Franklin Park Borough, Project ID
21100721

 

22Project Allocation

200,000

23(Base Project Allocation - $200,000)

 

24(386) PA 28, Reconstruction, PA 28 from
25Regional Industrial Development
26Corporation (RIDC) to Yutes Run,
27Springdale, O'Hara and Harmar
28Townships, Project ID 100774

 

29Project Allocation

1,750,000

30(Base Project Allocation - $1,750,000)

 

1(387) SR 0008, Resurface, Penn Avenue
2from Coal Street to North Dallas
3Avenue, City of Pittsburgh and
4Wilkinsburg Borough, Project ID 100759

 

5Project Allocation

320,000

6(Base Project Allocation - $320,000)

 

7(388) PA 28, Concrete Rehabilitation, PA
828 from General Robinson Street to
9Heinz Wall, City of Pittsburgh,
10Project ID 100773

 

11Project Allocation

1,040,000

12(Base Project Allocation - $1,040,000)

 

13(389) SR 0008, Resurface, PA 8 from
14Lincoln Highway to Swissvale Avenue,
15City of Pittsburgh, Project ID 100762

 

16Project Allocation

177,000

17(Base Project Allocation - $177,000)

 

18(390) SR 0019, Concrete Rehabilitation,
19US 19 from Parkway West to West End
20Bridge, City of Pittsburgh, Project ID
21100764

 

22Project Allocation

520,000

23(Base Project Allocation - $520,000)

 

24(391) Cochran Road, Resurface, Cochran
25Road from Washington Road to McFarland
26Road, Mount Lebanon Township, Project
27ID 100765

 

28Project Allocation

133,000

29(Base Project Allocation - $133,000)

 

30(392) SR 0019, Resurface, Marshall Avenue

 

1from Sorrell Street to Perrysville
2Avenue, McCandless Township, City of
3Pittsburgh, Project ID 100766

 

4Project Allocation

173,000

5(Base Project Allocation - $173,000)

 

6(393) US 19, Resurface, US 19 from Ivory
7Avenue to West View Park Drive, Ross
8Township, Project ID 100767

 

9Project Allocation

280,000

10(Base Project Allocation - $280,000)

 

11(394) US 22, Concrete Rehabilitation, US
1222 from the Washington County Line to
13US 30, Findlay Township, Project ID
14100768

 

15Project Allocation

1,620,000

16(Base Project Allocation - $1,620,000)

 

17(395) US 22, Concrete Rehabilitation, US
1822 from US 30 to McKee Road, North
19Fayette Township, Project ID 100769

 

20Project Allocation

1,300,000

21(Base Project Allocation - $1,300,000)

 

22(396) US 22, Reconstruction, US 22 from
23McKee Road to the Parkway, Robinson
24Township, Project ID 100770

 

25Project Allocation

1,460,000

26(Base Project Allocation - $1,460,000)

 

27(397) PA 28, Resurface, PA 28 from
28Millvale to Etna Interchange, Shaler
29Township, Millvale Borough, Project ID
30100771

 

1Project Allocation

360,000

2(Base Project Allocation - $360,000)

 

3(398) SR 0065, Resurface, PA 65, Ohio
4River Boulevard from River Avenue to
5Edgeworth Lane, Edgeworth and
6Sewickley Boroughs, Project ID 100797

 

7Project Allocation

280,000

8(Base Project Allocation - $280,000)

 

9(399) SR 0008, Resurface, William Flynn
10Highway from Hillcrest Farm Road to
11Pioneer Road, Shaler Township, Project
12ID 100758

 

13Project Allocation

444,000

14(Base Project Allocation - $444,000)

 

15(400) SR 1026, Resurface, SR 1026 from
16Starr Road to Mahaffy Road, West Deer
17Township, Project ID 100834

 

18Project Allocation

754,000

19(Base Project Allocation - $754,000)

 

20(401) Freeport Road, Resurface, Freeport
21Road from Allegheny Valley Extension
22to SR 1001 (Freeport Road), Sharpsburg
23Borough, Project ID 100823

 

24Project Allocation

700,000

25(Base Project Allocation - $700,000)

 

26(402) SR 1003, Resurface, SR 1003 from
27Fox Ridge Farms Road to SR 4019,
28Shaler Township, Project ID 100824

 

29Project Allocation

260,000

30(Base Project Allocation - $260,000)

 

1(403) SR 1008, Resurface, Gulf Lab Road
2from Gibsonia Road to Russellton Road,
3Harmar Township, Project ID 100825

 

4Project Allocation

860,000

5(Base Project Allocation - $860,000)

 

6(404) Tawney Run Road, Resurface, Tawney
7Run Road from Yutes Run Road to Butler
8Logan Road, Springdale and Frazer
9Townships, Project ID 100826

 

10Project Allocation

1,000,000

11(Base Project Allocation - $1,000,000)

 

12(405) SR 1015, Resurface, Russellton Road
13from Railroad Overpass to Voskamp
14Drive, Harmar Township, Project ID
15100827

 

16Project Allocation

351,000

17(Base Project Allocation - $351,000)

 

18(406) SR 1015, Resurface, Pearl Avenue
19from Freeport Road to Railroad
20Crossing, Harmar Township, Project ID
21100828

 

22Project Allocation

290,000

23(Base Project Allocation - $290,000)

 

24(407) SR 1017, Resurface, SR 1017 from
25Pittsburgh Street to Yutes Run Road,
26Springdale and Cheswick Townships,
27Project ID 100829

 

28Project Allocation

1,015,000

29(Base Project Allocation - $1,015,000)

 

30(408) SR 1020, Resurface, SR 1020 from

 

1Christine Road to East Union Road,
2West Deer Township, Project ID 100830

 

3Project Allocation

740,000

4(Base Project Allocation - $740,000)

 

5(409) Cedar Ridge Road, Resurface, Cedar
6Ridge Road from Middle Road to
7Gibsonia Road, West Deer Township,
8Project ID 100831

 

9Project Allocation

300,000

10(Base Project Allocation - $300,000)

 

11(410) Steubenville Pike, Resurface,
12Steubenville Pike from Beaver Grade
13Road to US 22/US 30, Robinson
14Township, Project ID 100795

 

15Project Allocation

320,000

16(Base Project Allocation - $320,000)

 

17(411) SR 1024, Resurface, SR 1024 from
18Gibsonia Road to Saxonburg Boulevard,
19West Deer Township, Project ID 100833

 

20Project Allocation

300,000

21(Base Project Allocation - $300,000)

 

22(412) Freeport Road, Resurface, Freeport
23Road from Jefferson Avenue to SR 2019,
24O'Hara Township, Project ID 100820

 

25Project Allocation

730,000

26(Base Project Allocation - $730,000)

 

27(413) SR 1030, Resurface, SR 1030 from
28Russelton Road to Bull Creek Road,
29West Deer, Frazer and Fawn Townships,
30Project ID 100835

 

1Project Allocation

355,000

2(Base Project Allocation - $355,000)

 

3(414) SR 1034, Resurface, Bull Creek Road
4from Jones Hollow Road to Fawn
5Township Line, Fawn Township, Project
6ID 100837

 

7Project Allocation

950,000

8(Base Project Allocation - $950,000)

 

9(415) Armstrong Road, Resurface,
10Armstrong Road from Bakerstown Road to
11Cannon Hill Road, West Deer Township,
12Project ID 100838

 

13Project Allocation

630,000

14(Base Project Allocation - $630,000)

 

15(416) SR 2001, Resurface, SR 2001 from
16Wylie Run to Wall Street, Lincoln and
17Glassport Boroughs and Elizabeth
18Township, Project ID 100839

 

19Project Allocation

444,000

20(Base Project Allocation - $444,000)

 

21(417) SR 2021, Resurface, SR 2021 from
22Santa Monica Street to River Road,
23Port Vue Borough, the City of
24McKeesport, Project ID 100840

 

25Project Allocation

840,000

26(Base Project Allocation - $840,000)

 

27(418) SR 2023, Resurface, SR 2023 from
28Lovedale Road to Bellbridge Road,
29Lincoln Borough, Project ID 100841

 

30Project Allocation

320,000

1(Base Project Allocation - $320,000)

 

2(419) SR 2023, Resurface, Harrison Hollow
3Road from Lovedale Road to West
4Smithfield Street, Lincoln Borough,
5Project ID 100842

 

6Project Allocation

990,000

7(Base Project Allocation - $990,000)

 

8(420) SR 3009, Resurface, SR 3009 from
9McMurray Road to Drake Road, Bethel
10Park Borough, Project ID 100871

 

11Project Allocation

223,000

12(Base Project Allocation - $223,000)

 

13(421) SR 2026, Resurface, SR 2026 from
14McKeesport Boulevard to Station
15Street, North Versailles Township and
16Wilmerding Borough, Project ID 100844

 

17Project Allocation

303,000

18(Base Project Allocation - $303,000)

 

19(422) Bryson Road, Resurface, Bryson Road
20from Bairdsford Road to Mountain View
21Road, West Deer Township, Project ID
22100832

 

23Project Allocation

620,000

24(Base Project Allocation - $620,000)

 

25(423) Saltsburg Road, Resurface,
26Saltsburg Road from Boyce Park Drive
27to Westmoreland County Line, Plum
28Borough, Project ID 100810

 

29Project Allocation

332,000

30(Base Project Allocation - $332,000)

 

1(424) SR 0065, Resurface, PA 65, Ohio
2River Boulevard from the Pedestrian
3Walkway to 200 Feet past Eckert Street
4Bridge, City of Pittsburgh, Project ID
5100798

 

6Project Allocation

430,000

7(Base Project Allocation - $430,000)

 

8(425) SR 0088, Resurface, Library Road
9from Finleyville Library Road to
10Baptist Road, Bethel Park Borough and
11Southpark Township, Project ID 100799

 

12Project Allocation

600,000

13(Base Project Allocation - $600,000)

 

14(426) SR 0130, Resurface, Beulah Road
15from Penn Avenue to Old Beulah Road,
16Churchill Borough, Project ID 100800

 

17Project Allocation

710,000

18(Base Project Allocation - $710,000)

 

19(427) SR 0130, Resurface, Fifth Street
20from Mosside Boulevard to Westmoreland
21County Line, Trafford and Monroeville
22Boroughs, Project ID 100801

 

23Project Allocation

600,000

24(Base Project Allocation - $600,000)

 

25(428) SR 0136, Resurface, West Newton
26Road from Ramp B SR 8051 to
27Westmoreland County Line, Elizabeth
28and Forward Townships, Project ID
29100802

 

30Project Allocation

220,000

1(Base Project Allocation - $220,000)

 

2(429) SR 0136, Resurface, Rainbow Run
3Road from Bunola River Road to Ramp B
4SR 8051, Forward Township, Project ID
5100803

 

6Project Allocation

610,000

7(Base Project Allocation - $610,000)

 

8(430) SR 0148, Resurface, Walnut Street
9from Walnut Street to Lysle Boulevard,
10City of McKeesport, Project ID 100804

 

11Project Allocation

330,000

12(Base Project Allocation - $330,000)

 

13(431) SR 0148, Resurface, Fifth Avenue
14from Fifth Avenue to Pennsylvania
15Avenue, City of McKeesport, Project ID
16100805

 

17Project Allocation

254,000

18(Base Project Allocation - $254,000)

 

19(432) SR 0400, Resurface, PA 400 from
20Craig Street to Tokay Street, City of
21Pittsburgh, Project ID 100807

 

22Project Allocation

785,000

23(Base Project Allocation - $785,000)

 

24(433) SR 1001, Resurface, Butler Street
25from Ramp from Etna to 28th South to
26Prager Street, Etna and Sharpsburg
27Boroughs, Project ID 100822

 

28Project Allocation

310,000

29(Base Project Allocation - $310,000)

 

30(434) SR 0400, Resurface, PA 400 from

 

1Tokay Street to Palm Avenue, Penn Hill
2Township, City of Pittsburgh, Project
3ID 100809

 

4Project Allocation

264,000

5(Base Project Allocation - $264,000)

 

6(435) Tenth Avenue, Resurface, Tenth
7Avenue from Lawton Street to Saxonburg
8Road, Sharpsburg Borough, Project ID
9100821

 

10Project Allocation

704,000

11(Base Project Allocation - $704,000)

 

12(436) SR 0837, Reconstruction, PA 837
13from Robinson Street to Dravosburg
14Road, Various Municipalities, Project
15ID 100811

 

16Project Allocation

2,370,000

17(Base Project Allocation - $2,370,000)

 

18(437) SR 0837, Resurface, State Street
19from Saint Clair Street to Lincoln
20Way, City of Clairton, Project ID
21100812

 

22Project Allocation

285,000

23(Base Project Allocation - $285,000)

 

24(438) State Street, Reconstruction, State
25Street from the Rankin Bridge to SR
260885 (Lebanon Road), Various
27Municipalities, Project ID 100813

 

28Project Allocation

1,092,000

29(Base Project Allocation - $1,092,000)

 

30(439) Eighth Avenue, Resurface, Eighth

 

1Avenue from the Ramp to Rankin Bridge
2to the Ramp from Rankin Bridge,
3Whitaker Borough, Project ID 100814

 

4Project Allocation

375,000

5(Base Project Allocation - $375,000)

 

6(440) SR 0885, Resurface, PA 885 from
7Alluvian Street to Mobile Street, City
8of Pittsburgh, Project ID 100815

 

9Project Allocation

206,000

10(Base Project Allocation - $206,000)

 

11(441) SR 0885, Resurface, PA 885 from
12CCAC Entrance to Lebanon Road, West
13Mifflin Borough, Project ID 100816

 

14Project Allocation

330,000

15(Base Project Allocation - $330,000)

 

16(442) PA 885, Resurface, PA 885 from
17Second Avenue to McDevitt Place, City
18of Pittsburgh, Project ID 100817

 

19Project Allocation

240,000

20(Base Project Allocation - $240,000)

 

21(443) Millers Run Road, Resurface,
22Millers Run Road from PA 50 to Battle
23Ridge Road, South Fayette Township,
24Project ID 100818

 

25Project Allocation

540,000

26(Base Project Allocation - $540,000)

 

27(444) Main Street, Resurface, Main Street
28from Powers Street to 400 Feet before
29the Third Entrance to Waterworks Mall
30on Left, Sharpsburg Borough, Project

 

1ID 100819

 

2Project Allocation

392,000

3(Base Project Allocation - $392,000)

 

4(445) McClintock Road, Resurface,
5McClintock Road from Muse Lane to
6Jacks Run Road, White Oak Borough,
7Project ID 100846

 

8Project Allocation

405,000

9(Base Project Allocation - $405,000)

 

10(446) SR 0400, Reconstruction, PA 400
11from Ross Street to Baum Boulevard,
12City of Pittsburgh, Project ID 100808

 

13Project Allocation

1,872,000

14(Base Project Allocation - $1,872,000)

 

15(447) I-79, Highway Reconstruction, I-79
16from the Washington County Line to the
17Butler County Line, Various
18Municipalities, Project ID 0

 

19Project Allocation

139,200,000

20(Base Project Allocation -
21$139,200,000)

 

22(448) Sardis Road, Resurface, Sardis Road
23from Webster Road to Logan Ferry Road,
24Plum Borough, Project ID 100869

 

25Project Allocation

460,000

26(Base Project Allocation - $460,000)

 

27(449) SR 3009, Resurface, McMurray Road
28to Library Road (PA 88), Bethel Park
29Borough, Project ID 0

 

30Project Allocation

1,125,000

1(Base Project Allocation - $1,100,000)

 

2(Design & Contingencies - $25,000)

 

3(450) SR 3073, Interchange Improvements,
4SR 3073 at Thorn Run Interchange, Moon
5Township, Project ID 0

 

6Project Allocation

3,300,000

7(Base Project Allocation - $3,300,000)

 

8(451) I-376, Highway Reconstruciton, I-
9376 from its Eastern Terminus at the
10Pennsylvania Turnpike to the Beaver
11County Line, Various Municipalities,
12Project ID 0

 

13Project Allocation

141,400,000

14(Base Project Allocation -
15$141,400,000)

 

16(452) I-279, Highway Reconstruction, I-
17279 from its Southern Terminus at I-79
18to its Northern Terminus at I-79,
19Various Municipalities, Project ID 0

 

20Project Allocation

78,000,000

21(Base Project Allocation -
22$78,000,000)

 

23(453) I-579, Highway Reconstruction, I-
24579 from its Southern Terminus at I-
25376 to its Northern Terminus in the
26City of Pittsburgh, Various
27Municipalities, Project ID 0

 

28Project Allocation

6,200,000

29(Base Project Allocation - $6,200,000)

 

30(Land Allocation - $)

 

1(Design & Contingencies - $)

 

2(454) Various Routes, Highway
3Reconstruction, Centre Avenue,
4Washington Place, Bedford Avenue and
5Crawford Street, City of Pittsburgh,
6Project ID 97844

 

7Project Allocation

9,720,000

8(Base Project Allocation - $9,720,000)

 

9(455) Various Routes, Rehabilitation,
10Resurface, Various State Owned Roads
11in the South Hills Area, Mount Lebanon
12and South Park Townships, Project ID
1399846

 

14Project Allocation

10,300,000

15(Base Project Allocation -
16$10,300,000)

 

17(456) Various State Routes, Roadway
18Realignment, Bridge Replacement, State
19Owned Routes in Vicinity of East
20Liberty Transit Center/Bakery Square,
21East Liberty, Liberty Township,
22Allegheny County, Project ID 0

 

23Project Allocation

2,750,000

24(Base Project Allocation - $2,750,000)

 

25Section 303. Armstrong County.

26Projects are as follows:

 

27(1) (Reserved).

 

28(2) SR 0210, Highway Restoration, along
29the PA 210 Corridor, South Bend
30Township, Atwood Borough,

 

1Cowanshannock Township, Project ID
288372

 

3Project Allocation

600,000

4(Base Project Allocation - $600,000)

 

5(3) SR 0422, Safety Improvement, along US
6422 from Silvis Hollow Road to East of
7Graham Road, Kittanning Township,
8Project ID 91249

 

9Project Allocation

3,363,000

10(Base Project Allocation - $2,101,000)

 

11(Land Allocation - $261,000)

 

12(Design & Contingencies - $1,001,000)

 

13(4) SR 3128, Highway Reconstruction, SR
143128, Cadogan Township, South Buffalo
15Township, Project ID 91804

 

16Project Allocation

500,000

17(Base Project Allocation - $500,000)

 

18(5) SR 0028, Highway Reconstruction,
19along PA 28 from SR 1028 (Anderson
20Creek Road) to T-535 (McAuley Falls
21Road), Boggs, Rayburn and Valley
22Townships, Project ID 91262

 

23Project Allocation

18,851,000

24(Base Project Allocation -
25$14,000,000)

 

26(Land Allocation - $3,601,000)

 

27(Design & Contingencies - $1,250,000)

 

28(6) SR 0422, Safety Improvement, along US
29422 from Ping Wing Hollow Road to
30Lasher Road, Kittanning and Manor

 

1Townships, Project ID 91252

 

2Project Allocation

17,702,000

3(Base Project Allocation -
4$15,000,000)

 

5(Land Allocation - $1,651,000)

 

6(Design & Contingencies - $1,051,000)

 

7(7) SR 0066, Highway Restoration, along
8the PA 66 Corridor, Apollo Borough,
9Parks and Gilpin Townships, Leechburg
10Borough, Bethel and Manor Townships,
11Ford City Borough, Project ID 88369

 

12Project Allocation

600,000

13(Base Project Allocation - $600,000)

 

14(8) SR 0056, Highway Resurfacing, along
15SR 0056, Apollo Borough, Kiskiminetas
16Township, North Apollo Borough, Parks
17Township, Project ID 91259

 

18Project Allocation

1,300,000

19(Base Project Allocation - $1,300,000)

 

20(9) SR 0066, Safety Improvement, Existing
21At-Grade Intersection of PA 66 and SR
222065 (Third Street), Leechburg
23Borough, Project ID 95902

 

24Project Allocation

297,000

25(Base Project Allocation - $297,000)

 

26(10) SR 1040, Safety Improvement,
27Intersection of SR 1040 (Water Street
28and SR 1038 (Market Street),
29Kittanning Borough, Project ID 91277

 

30Project Allocation

600,000

1(Base Project Allocation - $600,000)

 

2(11) SR 0210, Highway Reconstruction, SR
30210, Cowanshannock, Plumcreek and
4South Bend Townships, Atwood Borough,
5Project ID 91797

 

6Project Allocation

1,000,000

7(Base Project Allocation - $1,000,000)

 

8(12) SR 0028, Highway Restoration, along
9PA 28, Boggs, Buffalo, East Franklin,
10Mahoning and Manor Townships, New
11Bethlehem Borough, North Buffalo and
12Rayburn Townships, South Buffalo,
13Valley and Wayne Townships, Project ID
1488366

 

15Project Allocation

600,000

16(Base Project Allocation - $600,000)

 

17(13) SR 0028, Safety Improvement, PA 28
18from SR 1027 (Goheenville Snyderville
19Road) to SR 1016 (Calhoun School
20Road), Boggs and Wayne Townships,
21Project ID 69141

 

22Project Allocation

17,831,000

23(Base Project Allocation -
24$16,478,000)

 

25(Land Allocation - $1,006,000)

 

26(Design & Contingencies - $347,000)

 

27(14) SR 0356, Highway Reconstruction, PA
28356, Freeport Borough, Project ID
2991807

 

30Project Allocation

500,000

1(Base Project Allocation - $500,000)

 

2(15) SR 0068, Highway Reconstruction, PA
368, Bradys Bend Township, Project ID
491725

 

5Project Allocation

600,000

6(Base Project Allocation - $600,000)

 

7(16) SR 0028, Highway Realignment with
8Existing Structure, PA 28 Section 410,
9Structure over the North Fork of Pine
10Creek, Boggs Township, Project ID
1188774

 

12Project Allocation

1,494,000

13(Base Project Allocation - $1,012,000)

 

14(Land Allocation - $400,000)

 

15(Design & Contingencies - $82,000)

 

16(17) SR 2066, Resurface, along SR 2066
17from the PA 56 Intersection to the PA
1866 Intersection, Bethel and Parks
19Townships, Project ID 91780

 

20Project Allocation

520,000

21(Base Project Allocation - $520,000)

 

22(18) SR 3017, Highway Portion Bridge
23Replacement, SR 3017 (Freeport Road)
24over Ramps F and G of SR 0422, East
25Franklin Township, Project ID 98070

 

26Project Allocation

325,000

27(Design & Contingencies - $325,000)

 

28(19) SR 0268, Highway Portion Bridge
29Preservation Activities, PA 268 over
30US 422, East Franklin Township,

 

1Project ID 98057

 

2Project Allocation

2,401,000

3(Base Project Allocation – $2,000,000)

 

4(Design & Contingencies - $401,000)

 

5(20) SR 0422, Highway Reconstruction,
6US 422, East Franklin, Kittanning,
7Manor, North Buffalo, Plumcreek and
8West Franklin Townships, Elderton
9and Worthington Boroughs, Project
10ID 91745

 

11Project Allocation

2,600,000

12(Base Project Allocation - $2,600,000)

 

13(21) SR 2056, Highway Reconstruction, SR
142056, Kiskiminetas and South Bend
15Townships, Project ID 91778

 

16Project Allocation

950,000

17(Base Project Allocation - $950,000)

 

18(22) SR 0156, Resurface, along PA 156
19from the Westmoreland County Line to
20the PA 56 Intersection, Kiskiminetas
21Township, Project ID 91773

 

22Project Allocation

300,000

23(Base Project Allocation - $300,000)

 

24(23) SR 0128, Highway Reconstruction, PA
25128, Cadogan, Manor, North Buffalo and
26South Buffalo Townships, Ford City and
27Freeport Boroughs, Project ID 91758

 

28Project Allocation

2,200,000

29(Base Project Allocation - $2,200,000)

 

30(24) SR 0056, Highway Reconstruction, PA

 

156, Kiskiminetas, Parks and Southbend
2Townships, Apollo and North Apollo
3Boroughs, Project ID 91800

 

4Project Allocation

1,700,000

5(Base Project Allocation - $1,700,000)

 

6(25) SR 0085, Highway Reconstruction, SR
70085, Cowanshannock, Rayburn and
8Valley Townships, Rural Valley
9Borough, Project ID 91810

 

10Project Allocation

1,565,000

11(Base Project Allocation - $1,565,000)

 

12(26) SR 4023, Highway Reconstruction, SR
134023, East Franklin and Washington
14Townships, Applewood Borough, Project
15ID 91815

 

16Project Allocation

600,000

17(Base Project Allocation - $600,000)

 

18(27) SR 4010, Highway Reconstruction, SR
194010, East Franklin and West Franklin
20Townships, West Kittanning and
21Worthington Boroughs, Project ID 91813

 

22Project Allocation

500,000

23(Base Project Allocation - $500,000)

 

24(28) SR 0066, Highway Portion Bridge
25Replacement, Existing Structure
26carrying PA 66 over Guffy Run, Gilpin
27and Parks Townships, Project ID 23999

 

28Project Allocation

727,000

29(Base Project Allocation - $237,000)

 

30(Land Allocation - $16,000)

 

1(Design & Contingencies - $474,000)

 

2(29) SR 4009, Resurface, along SR 4009
3from PA 268 to PA 68, Bradys Bend and
4Sugarcreek Townships, Project ID 91812

 

5Project Allocation

1,200,000

6(Base Project Allocation - $1,200,000)

 

7(30) SR 0839, Highway Reconstruction, SR
80839, Cowanshannock, Mahoning,
9Redbank, Wayne Townships, Dayton and
10South Bethlehem Boroughs, Project ID
1191806

 

12Project Allocation

1,400,000

13(Base Project Allocation - $1,400,000)

 

14(31) SR 2003, Highway Reconstruction, SR
152003, Cowanshannock and Plumcreek
16Townships, Project ID 91820

 

17Project Allocation

600,000

18(Base Project Allocation - $600,000)

 

19(32) SR 0085, Highway Reconstruction, SR
200085, Cowanshannock, Rayburn and
21Valley Townships, Rural Valley
22Borough, Project ID 91818

 

23Project Allocation

1,200,000

24(Base Project Allocation - $1,200,000)

 

25(33) SR 0066, Resurface, along SR 0066
26from 5th Avenue (PA 128) to SR 0422,
27Manor Township, Project ID 91278

 

28Project Allocation

520,000

29(Base Project Allocation - $520,000)

 

30(34) SR 0422, Highway Reconstruction, SR

 

10422 at SR 0210, Plumcreek Township,
2Elderton Borough, Project ID 91281

 

3Project Allocation

1,217,000

4(Base Project Allocation - $1,217,000)

 

5(35) SR 1422, Resurface, along SR 1422
6(Indiana Road) from SR 0066 to SR
70422, Manor Township, Project ID 91279

 

8Project Allocation

823,000

9(Base Project Allocation - $823,000)

 

10(36) SR 0268, Highway Reconstruction, SR
110268, East Franklin, Hovey, Perry and
12Sugarcreek Townships, City of Parker,
13West Kittanning Borough, Project ID
1491809

 

15Project Allocation

1,900,000

16(Base Project Allocation - $1,900,000)

 

17(37) SR 0536, Resurface, along SR 0536
18from SR 1017 (Salem Road) to the
19Jefferson County Line, Redbank
20Township, Project ID 91808

 

21Project Allocation

900,000

22(Base Project Allocation - $900,000)

 

23(38) SR 1022, Resurface, SR 1022, SR 4021
24(Barnard Road) and SR 4022 (Dayton
25Smicksburg Road), Smicksburg Borough,
26Wayne and West Mahoning Townships,
27Project ID 99246

 

28Project Allocation

1,396,000

29(Base Project Allocation - $1,396,000)

 

30(39) SR 0128, Resurface, PA 128 (Fifth

 

1Avenue) from Ninth Street to PA 66,
2Ford City Borough, Manor Township,
3Project ID 99529

 

4Project Allocation

1,600,000

5(Base Project Allocation - $1,600,000)

 

6(40) SR 1040, Resurface, SR 1040 (Water
7Street) from SR 1442 (Indiana Road) to
8SR 1038 (Market Street), Kittanning
9Borough, Manor Township, Project ID
1099510

 

11Project Allocation

350,000

12(Base Project Allocation - $350,000)

 

13(41) SR 0839, Resurface, SR 0839 from
14Little Pine Run to PA 28, Mahoning and
15Redbank Townships, South Bethlehem
16Borough, Project ID 99926

 

17Project Allocation

2,400,000

18(Base Project Allocation - $2,400,000)

 

19(42) SR 0128, Resurface, PA 128 from the
20Ford City Borough Line to 9th Street,
21Ford City Borough, Project ID 99203

 

22Project Allocation

360,000

23(Base Project Allocation - $360,000)

 

24(43) SR 0028, Resurface, PA 28 from SR
251035 to Segments 404/418 and SR 1018
26to Segments 440/328, Boggs Township,
27Dayton Borough, Mahoning and Redbank
28Townships, South Bethlehem Borough,
29Wayne Township, Project ID 99316

 

30Project Allocation

3,120,000

1(Base Project Allocation - $3,120,000)

 

2Section 304. Beaver County.

3Projects are as follows:

 

4(1) (Reserved).

 

5(2) SR 0551, Highway Reconstruction, SR
60551 Hollow Road from Darlington Road
7to Enon Valley Road, Darlington
8Township, Project ID 91738

 

9Project Allocation

3,500,000

10(Base Project Allocation - $3,150,000)

 

11(Design & Contingencies - $350,000)

 

12(3) SR 0018, Highway Reconstruction, SR
130018 Frankfort Road from SR 0151 Green
14Garden Road, Raccoon Township, Project
15ID 91736

 

16Project Allocation

3,600,000

17(Base Project Allocation - $3,200,000)

 

18(Design & Contingencies - $400,000)

 

19(4) SR 0030, Highway Reconstruction, SR
200030, Lincoln Highway, from SR 0168 to
21SR 0151, Greene Township, Project ID
2288258

 

23Project Allocation

1,830,000

24(Base Project Allocation - $1,500,000)

 

25(Design & Contingencies - $330,000)

 

26(5) SR 3016, SR 3007, Highway
27Reconstruction, SR 3016 Mill Street,
28Kennedy Boulevard from Brodhead Road
29to Sheffield Avenue, Monaca Road and
30SR 3007 Brodhead Road from Sheffield

 

1Road to Admiral Street, City of
2Aliquippa, Project ID 91734

 

3Project Allocation

3,400,000

4(Base Project Allocation - $3,000,000)

 

5(Design & Contingencies - $)400,000

 

6(6) SR 0588, Highway Reconstruction, SR
70588 Stiffin Hill Road from Clayton
8Road to 7th Street, White Township,
9City of Beaver Falls, Eastvale
10Borough, Project ID 91740

 

11Project Allocation

3,475,000

12(Base Project Allocation - $3,175,000)

 

13(Design & Contingencies - $300,000)

 

14(7) SR 1002, Highway Reconstruction, SR
151002 Cherry Hill Road from SR 0351 to
16Brighton Road, North Sewickley
17Township, Project ID 91742

 

18Project Allocation

3,420,000

19(Base Project Allocation - $3,120,00)

 

20(Design & Contingencies - $300,000)

 

21(8) SR 0288, Highway Reconstruction, SR
220288 from SR 0065 to Shady Rest Road,
23Franklin Township, Project ID 88263

 

24Project Allocation

660,000

25(Base Project Allocation - $660,000)

 

26(9) SR 0288 Highway Reconstruction, River
27Road to Mercer Road, Franklin
28Township, Project ID 88456

 

29Project Allocation

110,000

30(Base Project Allocation - $110,000)

 

1(10) SR 1011, Highway Reconstruction, SR
21011 North Camp Run Road from
3Zelienople Road to Camp Run Road,
4Franklin Township, Project ID 91744

 

5Project Allocation

3,480,000

6(Base Project Allocation - $3,150,000)

 

7(Design & Contingencies - $330,000)

 

8(11) SR 3014, Highway Reconstruction, SR
93014 Golf Course Road from Dead End to
10Mill Street, Center and Hopewell
11Townships, City of Alilquippa, Project
12ID 91732

 

13Project Allocation

3,535,000

14(Base Project Allocation - $3,175,000)

 

15(Design & Contingencies - $360,000)

 

16(12) SR 3005, Highway Reconstruction, SR
173005 Chapel Road from Brodhead Road to
18Center Grange Road, Segments 0010 to
190060, City of Aliquippa, Hopewell and
20Center Townships, Project ID 91748

 

21Project Allocation

3,470,000

22(Base Project Allocation - $3,140,000)

 

23(Design & Contingencies - $330,000)

 

24(13) SR 0351, Highway Reconstruction, SR
250351 Crescent Drive from County Line
26to Centennial Avenue, Darlington
27Township, New Galilee Borough, Project
28ID 91726

 

29Project Allocation

3,500,000

30(Base Project Allocation - $3,140,000)

 

1(Design & Contingencies - $360,000)

 

2(14) SR 3005, Highway Reconstruction, SR
33005 Chapel Road from Center Grange
4Road to Old Brodhead Road, Segments
50060 to 0080, Center Township, Project
6ID 91750

 

7Project Allocation

3,460,000

8(Base Project Allocation - $3,100,000)

 

9(Design & Contingencies - $360,000)

 

10(15) SR 0588, Reconstruction, Clayton
11Road to Eastvale Bridge, City of
12Beaver Falls, Eastvale Borough, North
13Sewickly and White Townships, Project
14ID 88457

 

15Project Allocation

680,000

16(Base Project Allocation - $680,000)

 

17(16) SR 0989, Highway Reconstruction,
18Longvue Circle to Mohr Lane, Economy
19Borough, Project ID 88458

 

20Project Allocation

500,000

21(Base Project Allocation - $500,000)

 

22(17) SR 8029, Highway Portion Bridge
23Preservation, SR 8029 Ramp over 65 at
24SR 2002 Interchange, Freedom Borough,
25Project ID 95554

 

26Project Allocation

927,000

27(Base Project Allocation - $309,000)

 

28(Design & Contingencies - $618,000)

 

29(18) SR 0051, Bituminous Overlay, SR 0051
30from SR 0251 to SR 4004, Cannelton

 

1Road, City of Aliquipa, Bridgewater
2Borough, Center, Chippewa and
3Darlington Townships, East Rochester
4and Fallston Boroughs, Hopewell
5Township, Monaca Borough, Patterson
6Township, Rochester Borough, South
7Beaver Township, Project ID 88495

 

8Project Allocation

2,465,000

9(Base Project Allocation - $2,385,000)

 

10(Land Allocation - $20,000)

 

11(Design & Contingencies - $60,000)

 

12(19) SR 2012, Pavement Reconstruction, SR
132012 (Phillips Street) from State
14Street to Ridge Road Extension, Baden
15and Economy Boroughs, Project ID 91747

 

16Project Allocation

3,500,000

17(Base Project Allocation - $3,150,000)

 

18(Design & Contingencies - $350,000)

 

19(20) SR 3016, Concrete Pavement
20Rehabilitation, SR 3016 Kennedy
21Boulevard, from SR 3007 (Brodhead
22Road) to SR 3001 (Monaca Road), City
23of Aliquippa, Project ID 88373

 

24Project Allocation

564,000

25(Design & Contingencies - $564,000)

 

26(21) SR 2006, Highway Reconstruction, SR
272006 Lovi Road from Freedom Crider
28Road to Wallace City Road, New
29Sewickly Township, Project ID 91710

 

30Project Allocation

3,490,000

1(Base Project Allocation - $3,130,000)

 

2(Design & Contingencies - $360,000)

 

3(22) SR 0989, Highway Reconstruction, SR
40989 Ridge Road Extension from Droz
5Avenue to Legionville Hollow, Economy
6Borough, Project ID 91708

 

7Project Allocation

3,430,000

8(Base Project Allocation - $3,180,000)

 

9(Design & Contingencies - $250,000)

 

10(23) SR 0168, Highway Reconstruction, SR
110168 from Lisbon Road to Blackhawk
12Road, Ohioville Borough, South Beaver
13Township, Project ID 91707

 

14Project Allocation

3,625,000

15(Base Project Allocation - $3,245,000)

 

16(Design & Contingencies - $380,000)

 

17(24) SR 0151, Highway Reconstruction, SR
180151 from Park Road to Stone Quarry
19Road, Independence and Hopewell
20Townships, Project ID 91706

 

21Project Allocation

3,690,000

22(Base Project Allocation - $3,360,000)

 

23(Design & Contingencies - $330,000)

 

24(25) SR 0151, Highway Reconstruction, SR
250151 Bocktown Road from SR 0018 to
26Park Road, Raccoon, Hanover and
27Independence Townships, Project ID
2891701

 

29Project Allocation

3,560,000

30(Base Project Allocation - $3,180,000)

 

1(Design & Contingencies - $380,000)

 

2(26) SR 3011, Highway Reconstruction, SR
33011 Gringo Clinton Road from PA 151
4to the County Line, Hopewell Township,
5Project ID 91712

 

6Project Allocation

3,510,000

7(Base Project Allocation - $3,180,000)

 

8(Design & Contingencies - $330,000)

 

9(27) SR 0068, Highway Reconstruction, SR
100068 from Division Street to Railroad
11Overpass, Vanport Township, Project ID
1291699

 

13Project Allocation

2,530,000

14(Base Project Allocation - $2,300,000)

 

15(Design & Contingencies - $230,000)

 

16(28) SR 0068, Highway Reconstruction, SR
170051 Constitution Boulevard from SR
180065 to SR 0018, Rochester Township
19Bridgewater and Rochester Boroughs,
20Project ID 91577

 

21Project Allocation

3,250,000

22(Base Project Allocation - $3,000,000)

 

23(Design & Contingencies - $250,000)

 

24(29) SR 0051, Restoration, SR 0051 from
25SR 0251 to SR 4004, Chippewa,
26Darlington and South Beaver Townships,
27Project ID 91696

 

28Project Allocation

352,000

29(Design & Contingencies - $352,000)

 

30(30) SR 3012, Highway Reconstruction, SR

 

13012 Center Grange Road from SR 3007
2to SR 3001, Center Township, Project
3ID 91730

 

4Project Allocation

3,510,000

5(Base Project Allocation - $3,150,000)

 

6(Design & Contingencies - $360,000)

 

7(31) SR 0051, Highway Reconstruction, SR
80051 from Ohio State Line to McKinley
9Road, Chippewa Township, Project ID
1091718

 

11Project Allocation

3,130,000

12(Base Project Allocation - $2,800,000)

 

13(Design & Contingencies - $330,000)

 

14(32) I-376, Highway Reconstruction, I-
15376, Hopewell Township Line to Findlay
16Township, Hopewell and Center
17Townships, Project ID 87752

 

18Project Allocation

201,000

19(Base Project Allocation - $172,000)

 

20(Design & Contingencies - $29,000)

 

21(33) SR 2004, Realignment and Roadway
22Reconstruction, Located on SR 2004
23(Freedom Road) from Park Quarry Road
24to Wolfe Run Road, New Sewickly
25Township, Beaver County. This is
26Second Phase of 3 Construction Phase
27Project, New Sewickly Township,
28Project ID 82616

 

29Project Allocation

3,756,000

30(Base Project Allocation - $2,255,000)

 

1(Land Allocation - $600,00)

 

2(Design & Contingencies - $901,000)

 

3(34) SR 0018, Safety Improvement, SR 0018
4from SR 0065 to SR 0351, Hanover
5Township, Project ID 82562

 

6Project Allocation

788,000

7(Base Project Allocation - $750,000)

 

8(Design & Contingencies - $38,000)

 

9(35) SR 2005, Safety Improvement Slide
10Repair, SR 2005/0050 near the
11Intersection of Blank Drive, Economy
12Borough, Project ID 92934

 

13Project Allocation

1,800,000

14(Base Project Allocation - $1,800,000)

 

15(36) SR 0018, Full Reconstruction,
16Located on SR 0018, Fourth Avenue,
17from near the Intersection with 32nd
18Street to near the Intersection with
19Wallace Run Road, (SR 0551), City of
20Beaver Falls, Project ID 91582

 

21Project Allocation

792,000

22(Land Allocation - $711,000)

 

23(Design & Contingencies - $81,000)

 

24(37) SR 0018, Highway Reconstruction, SR
250018 Big Beaver Boulevard, from SR
260351 to Lawrence County Line, Big
27Beaver Borough, Project ID 91595

 

28Project Allocation

4,100,000

29(Base Project Allocation - $3,750,000)

 

30(Design & Contingencies - $350,000)

 

1(38) SR 0168, Highway Reconstruction, SR
20168 Salem Church Road from SR 0051 to
3Madison Road, Big Beaver and New
4Galilee Boroughs, Project ID 91721

 

5Project Allocation

3,530,000

6(Base Project Allocation - $3,170,000)

 

7(Design & Contingencies - $360,000)

 

8(39) SR 0151, Highway Reconstruction,
9Thompson Hill Road to SR 0060,
10Independence and Hopewell Townships,
11Project ID 88269

 

12Project Allocation

363,000

13(Base Project Allocation - $363,000)

 

14(40) SR 1005, Highway Reconstruction, SR
151005 Chapel Road from Mercer Road to
16Shady Rest Road, North Sewickly and
17Franklin Townships, Project ID 91727

 

18Project Allocation

3,520,000

19(Base Project Allocation - $3,190,000)

 

20(Design & Contingencies - $330,000)

 

21(41) SR 4030, Highway Reconstruction, SR
224030 Leopard Lane from Sharon Road to
23SR 0051, Bridgewater Borough, Project
24ID 91716

 

25Project Allocation

3,565,000

26(Base Project Allocation - $3,165,000)

 

27(Design & Contingencies - $400,000)

 

28(42) SR 0068, Highway Reconstruction, SR
290068 H Street and 3rd Street, Vanport
30Township, Beaver Borough, Project ID

 

188455

 

2Project Allocation

300,000

3(Base Project Allocation - $300,000)

 

4(43) SR 0018, Highway Reconstruction, SR
50018 Frankfort Road from Traverse
6Creek Bridge to SR 0151, Hanover and
7Raccoon Townships, Project ID 91697

 

8Project Allocation

3,560,000

9(Base Project Allocation - $3,180,000)

 

10(Design & Contingencies - $380,000)

 

11(44) SR 0065, Patch and Overlay, Located
12on SR 0065, from SR 0288 to Lawrence
13County Line also SR 0288, Zelienople
14Road from SR 0065 to Shady Rest Road,
15Elwood City Borough, Franklin
16Township, Project ID 75773

 

17Project Allocation

352,000

18(Design & Contingencies - $352,000)

 

19(45) SR 1021, Highway Portion Bridge
20Replacement, SR 1021, Allegheny
21County, Marion Township, Project ID
2293770

 

23Project Allocation

801,000

24(Base Project Allocation - $801,000)

 

25(46) SR 3002, Bituminous Overlay, SR
263002, Old Broadhead Road from
27Frankfort Road to Broadhead Road,
28Center Township, Project ID 96713

 

29Project Allocation

418,000

30(Base Project Allocation - $418,000)

 

1(47) SR 0065, Highway Reconstruction, SR
20065 from SR 0288 to Lawrence County
3Line, Ellwood City Borough, Franklin
4Township, Project ID 75673

 

5Project Allocation

3,425,000

6(Base Project Allocation - $3,170,000)

 

7(Design & Contingencies - $255,000)

 

8(48) SR 0168, Highway Reconstruction, SR
90168 from SR0030 to SR 0068, Greene
10Township, Hookstown, Industry and
11Shippingport Boroughs, Project ID
1278294

 

13Project Allocation

4,530,000

14(Base Project Allocation - $4,000,000)

 

15(Design & Contingencies - $530,000)

 

16(49) SR 0376, Restoration, SR 0376 from
17SR 0060 Vanport to Center Township,
18Center, Potter and Vanport Townships,
19Project ID 81976

 

20Project Allocation

1,731,000

21(Base Project Allocation - $1,422,000)

 

22(Land Allocation - $74,000)

 

23(Design & Contingencies - $235,000)

 

24(50) SR 4012, Highway Portion Bridge
25Rehabilitation, SR 4012 (Brady Run
26Road) over Branch of South Branch of
27Brady Run, Chippewa Township, Project
28ID 89150

 

29Project Allocation

785,000

30(Base Project Allocation - $738,000)

 

1(Design & Contingencies - $47,000)

 

2(51) SR 3016, Repair a Slide, 351 Feet
3West of Shannon Road and Extends for
4Approximately 169 Feet, Raccoon
5Township, Project ID 28996

 

6Project Allocation

676,000

7(Base Project Allocation - $500,00)

 

8(Land Allocation - $100,000)

 

9(Design & Contingencies - $76,000)

 

10(52) Pennsylvania Avenue, Resurface,
11Pennsylvania Avenue from PA 51 to PA
1218 (Ninth Street), Monaca Borough,
13Project ID 101229

 

14Project Allocation

605,000

15(Base Project Allocation - $605,000)

 

16(53) SR 4023, Resurface, Braden School
17Road from Braun Road to Constitution
18Boulevarde, Chippewa Township, Project
19ID 101225

 

20Project Allocation

338,000

21(Base Project Allocation - $338,000)

 

22(54) SR 4029, Resurface, SR 4029 from
23Tuscarawas Road to Blackhawk Road,
24Ohioville Borough, South Beaver
25Township, Project ID 101226

 

26Project Allocation

724,000

27(Base Project Allocation - $724,000)

 

28(55) SR 4042, Resurface, SR 4042 from SR
298039 to Madison Street, Bridgewater
30and Rochester Boroughs, Project ID

 

1101227

 

2Project Allocation

300,000

3(Base Project Allocation - $300,000)

 

4(56) Kelley Road, Resurface, Kelley Road
5from Wolf Run Road to Engle Road,
6Industry Borough, Project ID 101228

 

7Project Allocation

215,000

8(Base Project Allocation - $215,000)

 

9(57) SR 4018, Resurface, SR 4018 from
10Brady's Run Road to Third Street,
11Beaver Borough, Brighton Township,
12Project ID 101224

 

13Project Allocation

560,000

14(Base Project Allocation - $560,000)

 

15(58) Smith's Ferry Road, Resurface,
16Smiths Ferry Road from Liberty Road to
17Tuscarawas Road, Ohioville Borough,
18Project ID 101230

 

19Project Allocation

383,000

20(Base Project Allocation - $383,000)

 

21(59) SR 6018, Resurface, SR 6018 from
22Monaca Rochester Bridge to SR 8041
23(Ramps A and B), Rochester Borough,
24Project ID 101231

 

25Project Allocation

800,000

26(Base Project Allocation - $800,000)

 

27(60) Constitution Boulevard,
28Reconstruction, Constitution Boulevard
29from McKinley Road to the Ohio State
30Line, Chippewa, Darlington and South

 

1Beaver Townships, Project ID 101232

 

2Project Allocation

3,100,000

3(Base Project Allocation - $3,100,000)

 

4(61) Zelienople Road, Concrete
5Rehabilitation, Zelienople Road from
6PA 65 to Shady Rest Road, Franklin
7Township, Project ID 101233

 

8Project Allocation

900,000

9(Base Project Allocation - $900,000)

 

10(62) SR 0376, Interchange Improvements,
11I-376 (Beaver Valley Expressway) at
12the SR 0018 (Frankfort Road)
13Interchange, Center, Potter and
14Vanport Townships, Project ID 101828

 

15Project Allocation

40,000,000

16(Base Project Allocation -
17$40,000,000)

 

18(63) SR 4019, Highway Portion Bridge
19Replacement, SR 4019, Park Road over
20North Branch of Bradys Run, Chippewa
21Township, Project ID 99794

 

22Project Allocation

10,000,000

23(Base Project Allocation -
24$10,000,000)

 

25(64) SR 3020, Resurface, on Service Creek
26Road from Clearview Road to Green
27Garden Road, Hopewell and Independence
28Townships, Project ID 101221

 

29Project Allocation

2,050,000

30(Base Project Allocation - $2,050,000)

 

1(65) I-376, Highway Reconstruction, I-376
2from the Allegheny County Line to the
3Lawrence County Line, Various
4Municipalities, Project ID 0

 

5Project Allocation

71,600,000

6(Base Project Allocation -
7$71,600,000)

 

8(66) SR 1019, Highway Portion Bridge
9Replacement, SR 1018, Brush Creek Road
10over Branch Brush Creek, New Sewickley
11Township, Project ID 99795

 

12Project Allocation

10,000,000

13(Base Project Allocation -
14$10,000,000)

 

15(67) SR 0551, Resurface, from PA 551 from
1637th Street to Echo Valley, Big Beaver
17and Darlington Boroughs, Darlington
18and South Beaver Townships, Project ID
19101211

 

20Project Allocation

339,000

21(Base Project Allocation - $339,000)

 

22(68) SR 0018, Resurface, on Frankfort
23Road from Lincoln Highway to Green
24Garden Road, Hanover and Raccoon
25Townships, Project ID 101205

 

26Project Allocation

725,000

27(Base Project Allocation - $725,000)

 

28(69) SR 0065, Resurface, SR 0065 from
29Allegheny County Line to SR 0051,
30Ambridge and Rochester Boroughs,

 

1Project ID 101206

 

2Project Allocation

1,600,000

3(Base Project Allocation - $1,600,000)

 

4(70) PA 151, Resurface, PA 151 from Park
5Road to Stone Quarry Road,
6Independence Township, Project ID
7101207

 

8Project Allocation

852,000

9(Base Project Allocation - $852,000)

 

10(71) SR 0168, Resurface, on Salem Church
11Road from Tuscarawas Road to Beaver
12Run, Ohioville Borough, Project ID
13101208

 

14Project Allocation

335,000

15(Base Project Allocation - $335,000)

 

16(72) SR 0168, Resurface, on PA 168 from
17Moore Road to Second Street,
18Darlington Borough, Darlington and
19South Beaver Townships, Project ID
20101209

 

21Project Allocation

857,000

22(Base Project Allocation - $857,000)

 

23(73) SR 0168, Resurface, on PA 168 from
24Second Street to Eastbrook Road, Big
25Beaver and Darlington Boroughs,
26Darlington Township, New Galilee
27Borough, Project ID 101210

 

28Project Allocation

458,000

29(Base Project Allocation - $458,000)

 

30(74) SR 4012, Resurface, on State Route

 

14012 from Old Blackhawk Road to Grange
2Road, Brighton, Chippewa and South
3Beaver Townships, Project ID 101223

 

4Project Allocation

2,580,000

5(Base Project Allocation - $2,580,000)

 

6(75) Georgetown Road, Highway Portion
7Bridge Rehabilitation, Georgetown Road
8over PA 51, South Beaver Township,
9Project ID 101202

 

10Project Allocation

360,000

11(Base Project Allocation - $360,000)

 

12(76) SR 0051 and Various, Congestion and
13Safety Improvements, Various State
14Routes around Aliquippa Tin Mill
15Redevelopment, City of Aliquippa,
16Project ID 0

 

17Project Allocation

2,000,000

18(Base Project Allocation - $2,000,000)

 

19(77) SR 0989, Resurface, PA 989 (Ridge
20Road Extension) from Solar Drive to
21Conway Walrose Road, Ambridge and
22Economy Boroughs, Harmony Township,
23Project ID 101212

 

24Project Allocation

751,000

25(Base Project Allocation - $751,000)

 

26(78) SR 1006, Resurface, from Mercer Road
27from PA 65 (Mercer Road) to Zelienople
28Road, Franklin Township, Project ID
29101213

 

30Project Allocation

665,000

1(Base Project Allocation - $665,000)

 

2(79) SR 1016, Resurface, on State Route
31016 from Harmony Avenue to Brush
4Creek Road, Daughtery Township, New
5Brighton Borough, New Sewickley and
6Pulaski Townships, Project ID 101214

 

7Project Allocation

760,000

8(Base Project Allocation - $760,000)

 

9(80) SR 1019, Resurface from Brush Creek
10Road from Mecklem Road to PA 588,
11Marion Township, Project ID 101215

 

12Project Allocation

550,000

13(Base Project Allocation - $550,000)

 

14(81) SR 1032, Resurface, on SR 1032,
15Rochester-Freedom Road from Brighton
16Avenue to Ashland Oil Company Road,
17East Rochester and Rochester Boroughs,
18Project ID 101216

 

19Project Allocation

600,000

20(Base Project Allocation - $600,000)

 

21(82) SR 2006, Resurface, on SR 2006 from
22Freedom Crider Road to Sunset Drive,
23Economy Borough, New Sewickly
24Township, Project ID 101217

 

25Project Allocation

839,000

26(Base Project Allocation - $839,000)

 

27(83) SR 2008, Resurface, on SR 2008 from
28Ohio River Boulevard to PA 989, Conway
29and Economy Boroughs, Project ID
30101218

 

1Project Allocation

371,000

2(Base Project Allocation - $371,000)

 

3(84) SR 3005, Resurface, on Chapel Road
4from Brodhead Road to Old Brodhead
5Road, City of Aliquippa, Center and
6Hopewell Townships, Project ID 101219

 

7Project Allocation

798,000

8(Base Project Allocation - $798,000)

 

9(85) SR 3008, Resurface, on Montgomery
10Dam Road from Montgomery Dam to
11Frankfort Road, Potter Township,
12Project ID 101220

 

13Project Allocation

196,000

14(Base Project Allocation - $196,000)

 

15(86) SR 2004, Resurface, PA 989 to Butler
16County Line, Sewickley Township,
17Project ID 0

 

18Project Allocation

3,025,000

19(Base Project Allocation - $3,000,000)

 

20(Design & Contingencies - $25,000)

 

21(87) SR 3023, Resurface, on SR 3023 from
22Lincoln Highway to Clearview Road,
23Independence Township, Project ID
24101222

 

25Project Allocation

733,000

26(Base Project Allocation - $733,000)

 

27(88) Various Routes, Replace Guiderail,
28Various Locations Beaver County,
29Various, Project ID 85968

 

30Project Allocation

98,000

1(Base Project Allocation - $98,000)

 

2Section 305. Bedford County.

3Projects are as follows:

 

4(1) (Reserved).

 

5(2) SR 4017, Resurface, Indian Eve Road,
6(SR 4017) from PA 56 to Reynoldsdale
7Road (SR 4019), East Saint Clair
8Township, Project ID 96538

 

9Project Allocation

575,000

10(Base Project Allocation - $575,000)

 

11(3) SR 2026, Resurface, on Pointer Road,
12(SR 2026) from Ritchey Road (SR 1006)
13to East Mattie Road (SR 2029), East
14Providence and West Providence
15Townships, Project ID 96529

 

16Project Allocation

1,700,000

17(Base Project Allocation - $1,700,000)

 

18(4) SR 2029, Resurface, on East Mattie
19Road (SR 2029) from West Mattie Road
20(SR 2016) to US 30, East Providence
21Township, Project ID 96530

 

22Project Allocation

2,600,000

23(Base Project Allocation - $2,600,000)

 

24(5) SR 2031, Resurface, Equipment Road
25(SR 2031) from Winding Ridge Road (SR
262020) to SR 1006, West Providence
27Township, Project ID 96531

 

28Project Allocation

200,000

29(Base Project Allocation - $200,000)

 

30(6) SR 3012, Resurface, New Baltimore

 

1Road (SR 3012) from Somerset County
2Line to PA 31, Juniata Township,
3Project ID 96532

 

4Project Allocation

550,000

5(Base Project Allocation - $550,000)

 

6(7) SR 3019, Resurface, on Buena Road (SR
73019) from PA 31 to US 30, Juniata
8Township, Project ID 96533

 

9Project Allocation

3,100,000

10(Base Project Allocation - $3,100,000)

 

11(8) SR 4009, Resurface, on Buena Road (SR
124009) from PA 869 to Sara Furnace Road
13(SR 4034), King Township, Project ID
1496535

 

15Project Allocation

700,000

16(Base Project Allocation - $700,000)

 

17(9) SR 4025, Resurface, Schellsburg Road
18(SR 4025) from PA 869 to Scrubgrass
19Road (SR 4027), Kimmel Township,
20Project ID 96540

 

21Project Allocation

1,200,000

22(Base Project Allocation - $1,200,000)

 

23(10) SR 4014, Resurface, On Shaffer
24Mountain Road (SR 1035) from Somerset
25County Line to Hoover Road (SR 4001),
26Napier Township, Project ID 96537

 

27Project Allocation

1,400,000

28(Base Project Allocation - $1,400,000)

 

29(11) SR 0026, Resurface, on PA 26 from PA
30913 to the Huntingdon County Line,

 

1Liberty Township, Project ID 91603

 

2Project Allocation

2,752,000

3(Base Project Allocation - $2,701,000)

 

4(Land Allocation - $51,000)

 

5(12) SR 2017, Highway Restoration, Diehl
6Road (SR 2017) from Main Street (PA
726) to Egolf Road (PA 26), Colerain
8and Snake Spring Townships, Project ID
996528

 

10Project Allocation

3,400,000

11(Base Project Allocation - $3,400,000)

 

12(13) SR 0030, Roadway Reconstruction, on
13Lincoln Highway (US 30) from Allegheny
14Road (PA 31) to Point Road (SR 4022),
15Napier Township, Project ID 90236

 

16Project Allocation

269,000

17(Base Project Allocation - $261,000)

 

18(Land Allocation - $8,000)

 

19(14) SR 1001, Resurface, Sunnyside Road
20(SR 1001) from Richard Street (SR
214009) to Briar Valley Road (SR 1014),
22Bedford Borough, Bedford Township,
23Project ID 96521

 

24Project Allocation

700,000

25(Base Project Allocation - $700,000)

 

26(15) SR 0031, Rehabilitation, Resurface,
27on PA 31 from Approximately 1.0 Mile
28East of Faupel Road (T-418) to PA 96,
29Harrison Township, Project ID 96933

 

30Project Allocation

527,000

1(Base Project Allocation - $301,000)

 

2(Land Allocation - $25,000)

 

3(Design & Contingencies - $201,000)

 

4(16) SR 4026, Resurface, on Crissman Road
5(SR 4026) from Dunning Creek Road (T-
6671) to Valley Road (SR 4003), East
7Saint Clair and West Saint Clair
8Townships, Project ID 96541

 

9Project Allocation

950,000

10(Base Project Allocation - $950,000)

 

11(17) SR 4036, Resurface, on Riddlemoser
12Road (SR 4036) from Buena Road (SR
133019) to PA 31, Juniata Township,
14Project ID 96542

 

15Project Allocation

225,000

16(Base Project Allocation - $225,000)

 

17(18) SR 0030, Highway Reconstruction, US
1830 from SR 2029 East Mattie Road to
19Turnpike Overpass, East Providence
20Township, Project ID 91606

 

21Project Allocation

300,000

22(Base Project Allocation - $300,000)

 

23(19) SR 0030, Resurface, on US 30 from
24the Village of Juniata Crossing to SR
252029 (East Mattie Road), East
26Providence Township, Project ID 91605

 

27Project Allocation

2,500,000

28(Base Project Allocation - $2,500,000)

 

29(20) SR 4012, Resurface, Helixville Road
30(SR 4012) from US 30 to Hoover Road

 

1(SR 4001), Juniata and Napier
2Townships, Project ID 96536

 

3Project Allocation

2,000,000

4(Base Project Allocation - $2,000,000)

 

5(21) SR 0220, Resurface, on US 220 from
6Hisel Lane to Baltimore Grove Road,
7Cumberland Valley Township, Project ID
891610

 

9Project Allocation

1,700,000

10(Base Project Allocation - $1,700,000)

 

11(22) SR 1001, Resurface, SR 1001
12(Belden/Chalybeate Road) from SR 1018
13(Younts Road) to East of Intersection
14with SR 4009 (Business 220), Bedford
15Township, Project ID 96365

 

16Project Allocation

1,221,000

17(Base Project Allocation - $1,191,000)

 

18(Design and Contingencies - $30,000)

 

19(23) SR 0026, Highway Reconstruction, PA
2026 from Fort Piper to the Eichelberger
21Town Bridge, Hopewell Township,
22Project ID 92706

 

23Project Allocation

200,000

24(Base Project Allocation - $200,000)

 

25(24) SR 1019, Highway Reconstruction, SR
261019 from PA 26 in Hopewell Township
27to SR 0026 in Liberty Township,
28Hopewell and Liberty Townships,
29Project ID 92707

 

30Project Allocation

350,000

1(Base Project Allocation - $350,000)

 

2(25) SR 1042, Resurface, on PA 1042 from
3PA 867 to Blair County Line,
4Bloomfield Township, Project ID 92708

 

5Project Allocation

180,000

6(Base Project Allocation - $180,000)

 

7(26) SR 0096, Resurface, on PA 96 from
8Maryland State Line to Washington
9Street, Hyndman Borough, Londonderty
10Township, Project ID 96349

 

11Project Allocation

2,800,000

12(Base Project Allocation - $2,800,000)

 

13(27) SR 0022, Intersection Improvement,
14SR 1004 at the Intersection of Black
15Valley Road (SR 2105), West Providence
16Township, Project ID 88236

 

17Project Allocation

200,000

18(Base Project Allocation - $200,000)

 

19(28) SR 4011, Resurface, SR 4011 (Wilt
20Hollow Road), from SR 4012 (Helixville
21Road) to SR 4014 (Shaffer Mountain
22Road), Napier Township, Project ID
2396341

 

24Project Allocation

325,000

25(Base Project Allocation - $325,000)

 

26(29) SR 0869, Resurface, PA 869 from
27Mountain Road to PA 867, King
28Township, South Woodbury Township,
29Project ID 96340

 

30Project Allocation

550,000

1(Base Project Allocation - $550,000)

 

2(30) SR 0030, Highway Reconstruction, US
330 from Concrete Pavement in
4Breezewood to Turnpike Overpass, East
5Providence Township, Project ID 92758

 

6Project Allocation

1,000,000

7(Base Project Allocation - $1,000,000)

 

8(31) SR 1004, Resurface, Ashcom Road (SR
91004) from Lutzville Road (SR 2019) to
10PA 26, Snake Spring and West
11Providence Townships, Project ID 96523

 

12Project Allocation

1,700,000

13(Base Project Allocation - $1,700,000)

 

14(32) SR 0220, Resurface, on US 220 from
15Narrow Lane (T-337) to Hisel Lane,
16Cumberland Valley Township, Project ID
1791611

 

18Project Allocation

300,000

19(Base Project Allocation - $300,000)

 

20(33) SR 1029, Resurface, Earston Road (SR
211029) from Black Valley Road (SR 1004)
22to West Main Street (SR 1044), Everett
23Borough, West Providence Township,
24Project ID 96525

 

25Project Allocation

550,000

26(Base Project Allocation - $550,000)

 

27(34) SR 0026, Highway Reconstruction, SR
280026 from State Street T-611 to the
29Bud Shuster Byway, West Providence
30Township, Everett Borough, Project ID

 

191607

 

2Project Allocation

380,000

3(Base Project Allocation - $380,000)

 

4(35) SR 0026, Resurface, on PA 26 from
5Ridge Road (T-331) to Rock Hill Church
6Road (SR 2029), Mann, Monroe and
7Southampton Townships, Project ID
896515

 

9Project Allocation

4,850,000

10(Base Project Allocation - $4,850,000)

 

11(36) SR 0026, Resurface, PA 26 from
12Pipers Run Bridge to Jacks Corner Road
13(T-555), Hopewell Township, Project ID
1496516

 

15Project Allocation

700,000

16(Base Project Allocation - $700,000)

 

17(37) SR 0056, Resurface, on PA 56 from
18Reynoldsdale Road (SR 4032) to Red Oak
19Road (T-672), East Saint Clair
20Township, Project ID 96517

 

21Project Allocation

900,000

22(Base Project Allocation - $900,000)

 

23(38) SR 0056, Resurface, PA 56, Richard
24Street to US 30, Bedford Township,
25Project ID 96518

 

26Project Allocation

1,200,000

27(Base Project Allocation - $1,200,000)

 

28(39) SR 0096, Resurface, on PA 96 from
29Washington Street to Bard Hollow Road
30(SR 3008), Harrison Township, Hyndman

 

1Borough, Londonderry Township, Project
2ID 96519

 

3Project Allocation

1,972,000

4(Base Project Allocation - $1,972,000)

 

5(40) SR 0020, Resurface, US 220 from
6Evitts Creek Bride to SR 4009, Bedford
7and Cumberland Valley Townships,
8Project ID 96520

 

9Project Allocation

1,650,000

10(Base Project Allocation - $1,650,000)

 

11(41) SR 2013, Resurface, Cherry Lane (SR
122013) from PA 26 to West Providence
13Township Line, Monroe Township,
14Project ID 96527

 

15Project Allocation

700,000

16(Base Project Allocation - $700,000)

 

17(42) SR 1003, Resurface, on Pennknoll
18Road (SR 1003) from US 30 to SR 1005,
19Snake Spring Township, Project ID
2096522

 

21Project Allocation

2,100,000

22(Base Project Allocation - $2,100,000)

 

23(43) SR 0056, Intersection Improvement,
24Intersection of PA 56 (Pennsylvania
25Hollow Road) and SR 4009 (Business
26220), Bedford Township, Project ID
2748045

 

28Project Allocation

422,000

29(Base Project Allocation - $221,000)

 

30(Design & Contingencies - $201,000)

 

1(44) SR 0869, Highway Reconstruction, PA
2896 from SR 4019 South Imler Valley
3Road to the I-99 Interchange, East
4Saint Clair and King Townships,
5Project ID 91612

 

6Project Allocation

300,000

7(Base Project Allocation - $300,000)

 

8(45) SR 1019, Resurface, on Woodcock
9Valley Road (SR 1019) from Raystown
10Road (PA 26) to PA 26, Hopewell and
11Liberty Townships, Project ID 96524

 

12Project Allocation

1,800,000

13(Base Project Allocation - $1,800,000)

 

14(46) SR 0030, Resurface and Guiderail
15Update, US 30 from the Somerset County
16Line to the 4-Lane US 30 Bedford
17Bypass, Bedford, Juniata, Napier
18Townships, Schellsburg Borough,
19Project ID 63857

 

20Project Allocation

16,000,000

21(Base Project Allocation -
22$15,000,000)

 

23(Land Allocation - $1,000,000)

 

24(47) US 30, Reconstruction, Slide
25Stabilization, Travelers Rest to
26Narrows Crossover Road, East
27Providence and West Providence
28Townships, Project ID 93145

 

29Project Allocation

2,500,000

30(Base Project Allocation - $2,500,000)

 

1(48) SR 4009, Highway Restoration, on
2Business Route 220 (SR 4009) from
3Turnpike Interchange North to the End
4of Concrete, Bedford Township, Project
5ID 82393

 

6Project Allocation

354,000

7(Base Project Allocation - $229,000)

 

8(Design & Contingencies - $125,000)

 

9(49) SR 0036, Intersection Improvements
10and Add Center Turn Lane through
11Corridor, on PA 36 at the Intersection
12of PA 869 West Beyond NBC School,
13South Woodbury Township, Project ID
1488520

 

15Project Allocation

1,073,000

16(Base Project Allocation - $651,000)

 

17(Land Allocation - $221,000)

 

18(Design & Contingencies - $201,000)

 

19(50) SR 0056, Intersection Improvement,
20on PA 56 at the Intersection of Old
21Town Road (SR 4028), East Saint Clair
22Township, Project ID 88524

 

23Project Allocation

381,000

24(Base Project Allocation - $381,000)

 

25(51) I-99, Reconstruction, I-99 from its
26Southern Terminus at the Pennsylvania
27Turnpike to the Blair County Line,
28Various Municipalities, Project ID 0

 

29Project Allocation

57,600,000

30(Base Project Allocation -

 

1$57,600,000)

 

2(52) SR 1042, Highway Portion Bridge
3Replacement, Sproul Mountain Road (SR
41042) over Halter Creek, Bloomfield
5Township, Project ID 98778

 

6Project Allocation

601,000

7(Base Project Allocation - $601,000)

 

8(53) SR 0026, Highway Restoration, PA 26
9from Six Mile Run (SR 1036) to PA 913,
10Broadtop and Liberty Townships,
11Project ID 98773

 

12Project Allocation

13,752,000

13(Base Project Allocation -
14$13,501,000)

 

15(Land Allocation - $251,000)

 

16(54) I-70, Reconstruction, I-70 from the
17Fulton County Line to the Pennsylvania
18Turnpike, Various Municipalities,
19Project ID 0

 

20Project Allocation

14,000,000

21(Base Project Allocation -
22$14,000,000)

 

23Section 306. Berks County.

24Projects are as follows:

 

25(1) (Reserved).

 

26(2) SR 2006, Highway Resurface, SR 2006,
27City of Reading, Project ID 96381

 

28Project Allocation

1,001,000

29(Base Project Allocation - $1,000,000)

 

30(Design and Contingencies - $1,000)

 

1(3) SR 2004, Highway Resurface, Bingaman
2Street (Rt 2004), 5th Street to SR
32054 (Perkiomen Avenue), City of
4Reading, Project ID 96379

 

5Project Allocation

2,000,000

6(Base Project Allocation - $1,600,000)

 

7(Design and Contingencies - $400,000)

 

8(4) SR 2054, Highway Resurface, Perkiomen
9Avenue (SR 2054), Mount Penn Borough,
10City of Reading, Project ID 96378

 

11Project Allocation

2,000,000

12(Base Project Allocation - $1,600,000)

 

13(Design & Contingencies - $400,000)

 

14(5) SR 0100, Highway Resurface, PA 100
15Dairy Lane to Intersection with SR
160029 (Gravel Pike) and Seisholtzville
17Road (SR 1010), Bally Borough,
18Hereford and Washington Townships,
19Project ID 96382

 

20Project Allocation

6,172,000

21(Base Project Allocation - $6,101,000)

 

22(Design & Contingencies - $71,000)

 

23(6) SR 2021, Highway Resurface, Bus Route
24422 (SR 2021) to Dengler Street,
25Exeter Township, Mount Penn Borough,
26City of Reading, Saint Lawrence
27Borough, Project ID 96377

 

28Project Allocation

9,088,000

29(Base Project Allocation - $9,000,000)

 

30(Design & Contingencies - $88,000)

 

1(7) SR 0662, Highway Restoration, SR 0662
2from Jackson Street to Race Street,
3Fleetwood Borough, Richmond Township,
4Project ID 88385

 

5Project Allocation

1,845,000

6(Base Project Allocation - $1,570,000)

 

7(Land Allocation - $91,000)

 

8(Design & Contingencies - $184,000)

 

9(8) SR 2023, Highway Portion Bridge
10Rehabilitation, SR 2023 over Antietam
11Creek, Lower Alsace Township, Project
12ID 91932

 

13Project Allocation

1,390,000

14(Base Project Allocation - $1,058,000)

 

15(Land Allocation - $1,000)

 

16(Design & Contingencies - $331,000)

 

17(9) SR 0061, Highway Resurface, Shoemaker
18Avenue/Pottsville Pike (SR 0061) from
19Indian Manor Drive to Zion's Church
20Road, Leesport Borough, Ontelaunee and
21Perry Townships, Shoemakersville
22Borough, Windsor Township, Project ID
2396376

 

24Project Allocation

12,403,000

25(Base Project Allocation -
26$11,801,000)

 

27(Land Allocation - $1,000)

 

28(Design & Contingencies - $601,000)

 

29(10) SR 0422, Reconstruction, SR 0422,
30Penn Avenue to I-176, Cumru and Exeter

 

1Townships, City of Reading, West
2Reading Borough, Project ID 85997

 

3Project Allocation

1,000,000

4(Base Project Allocation - $1,000,000)

 

5(11) SR 0222, Intersection and Safety
6Improvements, SR 0222 and Long Lane,
7Maxatawny Township, Project ID 90569

 

8Project Allocation

2,088,000

9(Base Project Allocation - $2,088,000)

 

10(12) SR 0061, Intersection Improvements,
11SR 0061 and Tuckerton Road, Muhlenberg
12Township, Project ID 88792

 

13Project Allocation

2,630,000

14(Base Project Allocation - $1,838,000)

 

15(Land Allocation - $426,000)

 

16(Design & Contingencies - $366,000)

 

17(13) SR 0222, Intersection Improvements,
18SR 0222/0073 and Tamarack/Genesis and
19Maiden Creek Townships, Project ID
2092414

 

21Project Allocation

3,383,000

22(Base Project Allocation - $3,383,000)

 

23(14) SR 0012, Intersection Improvements,
24SR 0012 and SR 0073, Ruscombmanor
25Township, Project ID 88781

 

26Project Allocation

125,000

27(Base Project Allocation - $94,000)

 

28(Land Allocation - $12,000)

 

29(Design & Contingencies - $19,000)

 

30(15) SR 0422, Highway Reconstruction, US

 

1422 (West Shore Bypass) from PA 12 to
2US 422 Business, Cumru and Exeter
3Townships, City of Reading, West
4Reading and Wyomissing Boroughs,
5Project ID 72814

 

6Project Allocation

491,455,000

7(Base Project Allocation -
8$460,001,000)

 

9(Land Allocation - $22,000,000)

 

10(Design & Contingencies - $9,454,000)

 

11(16) SR 1006, Highway Portion Bridge
12Rehabilitation, SR 1006 over SR 0222,
13Richmond Township, Project ID 93627

 

14Project Allocation

2,201,000

15(Base Project Allocation - $2,200,000)

 

16(Design & Contingencies - $1,000)

 

17(17) SR 2005, Highway Portion Bridge
18Replacement, SR 2005 (5th Street) over
19SR 0012, Muhlenberg Township, Project
20ID 93626

 

21Project Allocation

1,802,000

22(Base Project Allocation - $1,800,000)

 

23(Land Allocation - $1,000)

 

24(Design & Contingencies - $1,000)

 

25(18) SR 0501, Highway Resurface,
26Lancaster Avenue (SR 0501) from
27Lebanon County Line to I-78, Bethel,
28Marion and Tulpehocken Townships,
29Project ID 96375

 

30Project Allocation

3,226,000

1(Base Project Allocation - $3,201,000)

 

2(Design & Contingencies - $25,000)

 

3(19) SR 0419, Highway Resurface, Four
4Points Road (SR 0419) from Rerhersburg
5Road to I-78, Bethel and Tulpehocken
6Townships, Project ID 96374

 

7Project Allocation

400,000

8(Design & Contingencies - $400,000)

 

9(20) SR 0061, Highway Resurface, PA 61
10from I-78 to Schuylkill County Line,
11Hamburg Borough, Tilden Township,
12Project ID 96373

 

13Project Allocation

3,620,000

14(Base Project Allocation - $3,207,000)

 

15(Land Allocation - $31,000)

 

16(Design & Contingencies - $382,000)

 

17(21) SR 0078, Highway Portion Bridge
18Replacement, I-78 at the Route 61
19Interchange, Hamburg Borough, Tilden
20Township, Project ID 93494

 

21Project Allocation

256,000

22(Base Project Allocation - $237,000)

 

23(Land Allocation - $2,000)

 

24(Design & Contingencies - $17,000)

 

25(22) SR 0029, Resurface, PA 29 Hereford
26Township, Hereford Township, Project
27ID 96372

 

28Project Allocation

3,586,000

29(Base Project Allocation - $3,201,000)

 

30(Land Allocation - $70,000)

 

1(Design & Contingencies - $315,000)

 

2(23) SR 0183, Highway Portion Bridge
3Replacement, Schuylkill Avenue
4Southbound (SR 1083) over NS Railroad,
5City of Reading, Project ID 91091

 

6Project Allocation

295,000

7(Base Project Allocation - $203,000)

 

8(Land Allocation - $48,000)

 

9(Design & Contingencies - $44,000)

 

10(24) SR 0422, Highway Resurfacing, SR
110422 from Wernersville Borough Line to
12PA 724, Lower Heidelberg Township,
13Sinking Spring Borough, South
14Heidelberg Township, Wernersville
15Borough, Project ID 89214

 

16Project Allocation

1,646,000

17(Base Project Allocation - $1,367,000)

 

18(Land Allocation - $21,000)

 

19(Design & Contingencies - $258,000)

 

20(25) SR 0078, Highway Portion Bridge
21Rehabilitation, I-78 over SR 0143,
22Greenwich Township, Project ID 97274

 

23Project Allocation

28,850,000

24(Base Project Allocation -
25$24,200,000)

 

26(Land Allocation - $688,000)

 

27(Design & Contingencies - $3,962,000)

 

28(26) SR 0222, Intersection Improvements,
29SR 0222 and 622, Richmond Township,
30Project ID 92411

 

1Project Allocation

2,066,000

2(Base Project Allocation - $2,066,000)

 

3(27) SR 0422, Reconstruction, SR 0422,
4Cumru Township, Exeter Township, City
5of Reading, West Reading and
6Wyomissing Boroughs, Project ID 94869

 

7Project Allocation

177,000

8(Base Project Allocation - $177,000)

 

9(28) SR 0422, Highway Restoration, from
10SR 2022/2023 to Montgomery County,
11Amity and Douglass Townships, Project
12ID 89234

 

13Project Allocation

359,000

14(Base Project Allocation - $352,000)

 

15(Design & Contingencies - $7,000)

 

16(29) SR 0012, Highway Restoration, PA 12
17from US 422 to SR 2005, Muhlenberg
18Township, City of Reading, Wyomissing
19Borough, Project ID 89215


20Project Allocation

17,552,000

21(Base Project Allocation -
22$17,550,000)

 

23(Land Allocation - $1,000)

 

24(Design & Contingencies - $1,000)

 

25(30) SR 0422, Highway Resurfacing and
26Safety Improvement, SR 0422 from SR
270419 to Wernersville Borough Line,
28Heidelberg and Lower Heidelberg
29Townships, Robesonia Borough, South
30Heidelberg Township, Wernersville

 

1Borough, Project ID 94857

 

2Project Allocation

311,000

3(Land Allocation - $8,000)

 

4(Design & Contingencies - $303,000)

 

5(31) SR 2087, Highway Portion Bridge
6Replacement, SR 2087 over Norfolk
7Southern Railroad, City of Reading,
8Project ID 91995

 

9Project Allocation

1,002,000

10(Base Project Allocation - $1,000,000)

 

11(Land Allocation - $1,000)

 

12(Design & Contingencies - $1,000)

 

13(32) SR 0645, Rehabilitation, Resurface,
14SR 0645 Segment 60 to 70, Bethel
15Township, Project ID 98088

 

16Project Allocation

1,625,000

17(Base Project Allocation - $1,500,000)

 

18(Design & Contingencies - $125,000)

 

19(33) SR 0073, Intersection Improvements,
20SR 0073 at SR 0662, East of
21Intersection, Oley Township, Project
22ID 92922

 

23Project Allocation

155,000

24(Base Project Allocation - $155,000)

 

25(34) SR 0073, Intersection Improvements,
26SR 0073 and 0662, Oley Township,
27Project ID 92921

 

28Project Allocation

646,000

29(Base Project Allocation - $441,000)

 

30(Land Allocation - $66,000)

 

1(Design & Contingencies - $139,000)

 

2(35) SR 0422, Freeway Service Patrol, SR
30422 Corridor, Exeter Township, West
4Reading and Wyomissing Boroughs,
5Project ID 94900

 

6Project Allocation

100,000

7(Base Project Allocation - $100,000)

 

8(36) SR 0222, Rehabilitation, Resurface,
9SR 0222 from Kutztown Bypass Northward
10to Lehigh County Line, Maxatawny
11Township, Project ID 97234

 

12Project Allocation

13,402,000

13(Base Project Allocation - $7,600,000)

 

14(Land Allocation - $1,201,000)

 

15(Design & Contingencies - $4,601,000

 

16(37) SR 2082, Resurface, Bridge over Hay
17Creek to Route 345, Birdsboro Borough,
18Project ID 0

 

19Project Allocation

560,000

20(Base Project Allocation - $500,000)

 

21(Design & Contingencies - $60,000)

 

22(38) I-78, Reconstruction, I-78 from the
23Lebanon County Line to the Lehigh
24County Line, Various Municipalities,
25Project ID 0

 

26Project Allocation

141,600,000

27(Base Project Allocation -
28$141,600,000)

 

29(39) I-76, Reconstruction, I-176 from its
30Southern Terminus at the Pennsylvania

 

1Turnpike to its Northern Terminus at
2US 422, Various Municipalities,
3Project ID 0

 

4Project Allocation

45,400,000

5(Base Project Allocation -
6$45,400,000)

 

7(40) SR 0061, Highway Portion Bridge
8Preservation, Various Bridges, Exeter,
9Heidelberg and Ontelaunee Townships,
10Project ID 101965

 

11Project Allocation

12,500,000

12(Base Project Allocation -
13$11,538,000)

 

14(Design & Contingencies - $962,000)

 

15(41) Various, Guiderail Replacement,
16Various Locations Berks County,
17Various Municipalities, Project ID
1889231

 

19Project Allocation

300,000

20(Base Project Allocation - $300,000)

 

21(42) Various, Guide Sign Replacements and
22Upgrades, Various Locations on
23Interstates and Expressways in Berks
24County, Various Municipalities,
25Project ID 91960

 

26Project Allocation

180,000

27(Base Project Allocation - $180,000)

 

28Section 307. Blair County.

29Projects are as follows:

 

30(1) (Reserved).

 

1(2) SR 3013, Resurface, William Penn Road
2(SR 3013) from Polecat Run to PA 164,
3Freedom and Greenfield Townships,
4Project ID 96469

 

5Project Allocation

725,000

6(Base Project Allocation - $725,000)

 

7(3) SR 4027, Resurface, 10th Street (SR
84027) from Washington Avenue to Herald
9Street, Tyrone Borough, Project ID
1096479

 

11Project Allocation

125,000

12(Base Project Allocation - $125,000)

 

13(4) SR 0026, Safety Improvement, US 22
14from Cambria County Line East to the
15PA 764 Interchange, Allegheny
16Township, Project ID 88200

 

17Project Allocation

200,000

18(Base Project Allocation - $200,000)

 

19(5) SR 3005, Resurface, Cottontown Road
20(SR 3005 from Quarry Road (SR 3006) to
21Ski Gap Road (SR 3002), Greenfield
22Township, Project ID 96459

 

23Project Allocation

1,400,000

24(Base Project Allocation - $1,400,000)

 

25(6) SR 3006, Resurface, Quarry Road (SR
263006) from Bedford County Line to
27Dunnings Highway (SR 3013), Greenfield
28Township, Project ID 96460

 

29Project Allocation

380,000

30(Base Project Allocation - $380,000)

 

1(7) SR 3007, Resurface, Schellsburg Road
2(SR 3007) from Bedford County Line to
3Cottontown Road (SR 3005), Greenfield
4Township, Project ID 96461

 

5Project Allocation

200,000

6(Base Project Allocation - $200,000)

 

7(8) SR 3008, Resurface, Polecat Hollow
8Road (SR 3008) from PA 164 to Bedford
9Street, Freedom and Greenfield
10Townships, Project ID 96462

 

11Project Allocation

1,500,000

12(Base Project Allocation - $1,500,000)

 

13(9) SR 3009, Resurface, Valley Forge Road
14(SR 3009) from Poplar Run Road (SR
153010) to Old Route 22 (SR 3012),
16Juniata Township, Project ID 96463

 

17Project Allocation

925,000

18(Base Project Allocation - $925,000)

 

19(10) SR 0164, Resurface, PA 164 from SR
203013 to PA 36, Freedom Township,
21Project ID 96467

 

22Project Allocation

1,250,000

23(Base Project Allocation - $1,250,000)

 

24(11) SR 4002, Resurface, Sugar Run Road
25(SR 4002) from Tunnel Hill Street (SR
264001) to PA 764, Allegheny Township,
27Project ID 96472

 

28Project Allocation

2,300,000

29(Base Project Allocation - $2,300,000)

 

30(12) SR 3013, Concrete Restoration,

 

1William Penn Road (SR 3013) from
2Bedford County Line to Mill Road (T-
3405), Greenfield Township, Project ID
496468

 

5Project Allocation

1,600,000

6(Base Project Allocation - $1,600,000)

 

7(13) SR 2008, Resurface, Plum Creek Road
8(SR 2008) from PA 36 to PA 164, Taylor
9Township, Project ID 96411

 

10Project Allocation

1,200,000

11(Base Project Allocation - $1,200,000)

 

12(14) SR 4024, Resurface, Broad Avenue (SR
134024) from Logan Boulevard (SR 4003)
14to PA 36, City of Altoona, Project ID
1596477

 

16Project Allocation

275,000

17(Base Project Allocation - $275,000)

 

18(15) SR 4023, Resurface, Tipton Road (SR
194023) from Bell Tip Road (SR 4021) to
20Grazierville Road (SR 4025), Antis
21Township, Project ID 96476

 

22Project Allocation

1,500,000

23(Base Project Allocation - $1,500,000)

 

24(16) SR 4005, Resurface, 31st Street (SR
254005) from Beale Avenue to Pine
26Avenue, City of Altoona, Project ID
2796473

 

28Project Allocation

400,000

29(Base Project Allocation - $400,000)

 

30(17) SR 4020, Resurface, Reightown Road

 

1(SR 4020) from Grandview Road (SR
24015) to North First Street, Antis
3Township, Bellwood Borough, Project ID
496474

 

5Project Allocation

525,000

6(Base Project Allocation - $525,000)

 

7(18) SR 4021, Resurface, Bell Tip Road
8(SR 4021) from PA 865 to Tipton Road
9(SR 4023), Antis Township, Project ID
1096475

 

11Project Allocation

1,000,000

12(Base Project Allocation - $1,000,000)

 

13(19) SR 2014, Resurface, Plank Road (SR
142014) from Smith Street to Reservoir
15Road (SR 2007), Blair and Frankstown
16Townships, Hollidaysburg Borough,
17Project ID 96412

 

18Project Allocation

600,000

19(Base Project Allocation - $600,000)

 

20(20) SR 1016, Resurface, Turkey Valley
21Road (SR 1016) from US 22 to Quarry
22Road (SR 1011), Frankstown Township,
23Project ID 96409

 

24Project Allocation

975,000

25(Base Project Allocation - $975,000)

 

26(21) SR 1001, Resurface, Plank Road (SR
271001) from US 22 to Sheraton Drive,
28Allegheny, Blair and Logan Townships,
29Project ID 96403

 

30Project Allocation

2,500,000

1(Base Project Allocation - $2,500,000)

 

2(22) SR 0866, Resurface, PA 866 from
3Sportmans Road (T-357) to Locke
4Mountain Road (SR 2020), Huston and
5Woodbury Townships, Project ID 96401

 

6Project Allocation

1,000,000

7(Base Project Allocation - $1,000,000)

 

8(23) SR 0453, Rockfall Stabilization, PA
9453 from Beginning of 4 Lane to New
10Enterprise Stone and Lime Company
11Tyrone Quarry Entrance, Snyder
12Township, Project ID 96400

 

13Project Allocation

1,350,000

14(Base Project Allocation - $1,000,000)

 

15(Land Allocation - $25,000)

 

16(Design & Contingencies - $325,000)

 

17(24) SR 0164, Resurface, on PA 164 from
18Cambria County Line to Knob Run Road
19(SR 3003), Juniata Township, Project
20ID 96399

 

21Project Allocation

149,000

22(Base Project Allocation - $149,000)

 

23(25) SR 0022, Resurface, on US 22 from SR
243012 to Turkey Valley Road (SR 1016),
25Allegheny and Blair Townships,
26Duncansville Borough and Frankstown
27Township, Hollidaysburg Borough,
28Project ID 96398

 

29Project Allocation

745,000

30(Base Project Allocation - $745,000)

 

1(26) SR 1011, Resurface, Quarry Road (SR
21011) from Canoe Creek to US 22,
3Frankstown Township, Project ID 96404

 

4Project Allocation

2,700,000

5(Base Project Allocation - $2,700,000)

 

6(27) SR 0022, Intersection Improvements,
7from a Point 150 Feet West of the
8Intersection of US 22 with SR 2007
9(Reservoir Road) East through the
10Intersection of US 22 with SR 1009
11(Frankstown Road to the Village of
12Geeseytown, Approximately 150 Feet
13beyond the Geeseytown Cemetery,
14Frankstown Township, Project ID 92537

 

15Project Allocation

2,043,000

16(Base Project Allocation - $1,982,000)

 

17(Land Allocation - $20,000)

 

18(Design & Contingencies - $41,000)

 

19(28) SR 1013, Resurface, SR 1013 –
20Pleasant Valley Boulevard to Golf
21Course Road, City of Altoona, Tyrone
22and Logan Townships, Project ID 96405

 

23Project Allocation

2,600,000

24(Base Project Allocation - $2,600,000)

 

25(29) SR 1013, Resurface, on Kettle Road
26(SR 1013) from Golf Course Road (SR
271015) to PA 453, Tyrone Township,
28Project ID 96406

 

29Project Allocation

1,800,000

30(Base Project Allocation - $1,800,000)

 

1(30) SR 4019, Highway Reconstruction, SR
24019 from SR 4022 Stadium Drive to
3Main Street, Antis Township, Bellwood
4Borough, Project ID 92743

 

5Project Allocation

150,000

6(Base Project Allocation - $150,000)

 

7(31) SR 3003, Resurface, Knob Run Road
8(SR 3003) from PA 164 to Dick Street
9(T-611), Blair, Freedom and Juniata
10Townships, Project ID 96456

 

11Project Allocation

2,321,000

12(Base Project Allocation - $2,321,000)

 

13(32) SR 4027, Resurface, SR 4027 from the
14Tyrone Borough Line to PA 350, Snyder
15Township, Project ID 96480

 

16Project Allocation

1,400,000

17(Base Project Allocation - $1,400,000)

 

18(33) SR 3004, Resurface, Buttermilk
19Hollow Road (SR 3004) from Locust
20Hollow Road (SR 3005) to Ski Gap Road
21(SR 3002), Greenfield Township,
22Project ID 96457

 

23Project Allocation

825,000

24(Base Project Allocation - $825,000)

 

25(34) SR 4008, Resurface, SR 4008 from
26Cambria County Line to West Chestnut
27Avenue, City of Altoona, Logan
28Township, Project ID 92595

 

29Project Allocation

600,000

30(Base Project Allocation - $600,000)

 

1(35) SR 2016, Resurface, Chimney Rocks
2Road (SR 2016) from PA 36 to West Loop
3Road (SR 2014), Blair Township,
4Project ID 96450

 

5Project Allocation

500,000

6(Base Project Allocation - $500,000)

 

7(36) SR 2017, Resurface, Fox Run Road (SR
82017) from Yellow Springs Drive (SR
92015) to US 22, Catharine and Morris
10Townships, Project ID 96451

 

11Project Allocation

1,800,000

12(Base Project Allocation - $1,800,000)

 

13(37) SR 2007, Resurface, Reservoir Road
14(SR 2007) from West Loop Road (SR
152014) to US 22, Frankstown Township,
16Project ID 96410

 

17Project Allocation

700,000

18(Base Project Allocation - $700,000)

 

19(38) SR 2020, Resurface, Locke Mountain
20Road (SR 2020) from Reservoir Road (SR
212007) to Evans Road (T-380),
22Frankstown, Huston and Woodbury
23Townships, Project ID 96452

 

24Project Allocation

2,500,000

25(Base Project Allocation - $2,500,000)

 

26(39) SR 2022, Resurface, Juniata Valley
27Road (SR 2002) from US 22 to US 22,
28Frankstown Township, Project ID 96453

 

29Project Allocation

1,750,000

30(Base Project Allocation - $1,750,000)

 

1(40) SR 3001, Resurface, Knob Road (SR
23001) from Blue Knob Road (SR 4035) to
3PA 164, Greenfield and Juniata
4Townships, Project ID 96454

 

5Project Allocation

1,516,000

6(Base Project Allocation - $1,516,000)

 

7(41) SR 0866, Resurface, PA 866 from
8Locke Mountain Road (SR 2020) to Union
9Street, Williamsburg Borough, Woodbury
10Township, Project ID 96402

 

11Project Allocation

1,700,000

12(Base Project Allocation - $1,700,000)

 

13(42) SR 3003, Resurface, Knob Road (SR
143003) from Diamond Lane (SR 3001) to
15PA 164, Greenfield and Juniata
16Township, Project ID 96455

 

17Project Allocation

800,000

18(Base Project Allocation - $800,000)

 

19(43) SR 2024, SR 3003, Highway
20Reconstruction, SR 2024 Sproul
21Mountain Road from Sproul Mountain to
22Sproul Interchange and SR 3013 William
23Penn Road from Sproul Interchange to
24T-405 Mill Road, Greenfield Township,
25Project ID 92598

 

26Project Allocation

456,000

27(Base Project Allocation - $456,000)

 

28(44) SR 1015, Resurface, on Golf Course
29Road (SR 1015) from Kettle Road (SR
301013) to Hileman Road (SR 1008),

 

1Tyrone Township, Project ID 96407

 

2Project Allocation

1,200,000

3(Base Project Allocation - $1,200,000)

 

4(45) SR 0036, Resurface, with Drainage
5and Guiderail as Required, on PA 36
6from the Bedford County Line to I-99,
7Blair and Freedom Townships, Roaring
8Springs Borough, Taylor Township,
9Project ID 89339

 

10Project Allocation

2,064,000

11(Base Project Allocation - $1,994,000)

 

12(Design & Contingencies - $70,000)

 

13(46) SR 0022, Resurface, on US 22 from SR
143012 to US 22 Interchange and on PA
15764 from US 22 Interchange to Veeder
16Root Driveway, Allegheny Township,
17Project ID 91614

 

18Project Allocation

407,000

19(Base Project Allocation - $407,000)

 

20(47) SR 2017, Highway Portion Bridge
21Replacement, SR 2017 (Fox Run Road)
22over Fox Run near the Intersection of
23Goodman Road (T-482), Catharine and
24Morris Townships, Project ID 94442

 

25Project Allocation

122,000

26(Base Project Allocation - $119,000)

 

27(Land Allocation - $3,000)

 

28(48) SR 1013, Pipe Replacements, SR 1013
29(Kettle Road) over Sinking Run, Tyrone
30Township, Project ID 93762

 

1Project Allocation

847,000

2(Base Project Allocation - $760,000)

 

3(Land Allocation - $66,000)

 

4(Design & Contingencies - $21,000)

 

5(49) SR 1013, Pipe Replacements, SR 1013
6(Kettle Road) over Sinking Run, Tyrone
7Township, Project ID 93766

 

8Project Allocation

587,000

9(Base Project Allocation - $501,000)

 

10(Land Allocation - $65,000)

 

11(Design & Contingencies - $21,000)

 

12(50) SR 1009, Mill and Overlay and
13Intersection Upgrade, On Frankstown
14Road (SR 1009) from Scotch Valley Road
15(T-424) to Park Avenue (SR 1021),
16Frankstown and Logan Townships,
17Project ID 88543

 

18Project Allocation

1,928,000

19(Base Project Allocation - $1,770,000)

 

20(Land Allocation - $115,000)

 

21(Design & Contingencies - $43,000)

 

22(51) SR 4010, Safety Improvement, 17th
23Street from 12th Avenue to the I-99
24Interchange, 6th/7th Avenue, 5th
25Avenue and 8th Avenue from 31st Street
26to Kettle Street, 12th Avenue from
2717th Street to 18th Street and 18th
28Street from 12th Avenue to 13th
29Avenue, City of Altoona, Logan
30Township, Project ID 94670

 

1Project Allocation

652,000

2(Base Project Allocation - $601,000)

 

3(Land Allocation - $51,000)

 

4(52) SR 1013, Pipe Replacements, SR 1013
5(Kettle Road) over Sinking Run, Tyrone
6Township, Project ID 93767

 

7Project Allocation

587,000

8(Base Project Allocation - $501,000)

 

9(Land Allocation - $65,000)

 

10(Design & Contingencies - $21,000)

 

11(53) SR 0022, Intersection Improvement,
12on US 22 at the Intersection of 7th
13Street, Duncansville Borough, Project
14ID 88539

 

15Project Allocation

276,000

16(Base Project Allocation - $276,000)

 

17(54) SR 1001, Resurface, on Plank Road
18(SR 1001) from Sellers Drive (T-584)
19to Goods Lane (SR 4004), Allegheny and
20Logan Townships, Project ID 91616

 

21Project Allocation

195,000

22(Base Project Allocation - $195,000)

 

23(55) SR 4029, Reconstruction, Clay Avenue
24(SR 4029) from Engelman Drive to PA
25453, Snyder Township, Tyrone Borough,
26Project ID 97858

 

27Project Allocation

152,000

28(Base Project Allocation - $81,000)

 

29(Land Allocation - $71,000)

 

30(56) SR 0764, Resurface, PA 764 from SR

 

11001 (Pleasant Valley Boulevard) to SR
24018 (Sabbath Rest Road), Antis and
3Logan Townships, Project ID 94438

 

4Project Allocation

600,000

5(Base Project Allocation - $600,000)

 

6(57) SR 0764, Intersection Improvement,
7PA 764 (6th Avenue) with SR 4013 (7th
8Street) and the Intersection of SR
94013 (7th Street) and SR 4013
10(Chestnut Avenue), City of Altoona,
11Project ID 94439

 

12Project Allocation

791,000

13(Base Project Allocation - $600,000)

 

14(Land Allocation - $71,000)

 

15(Design & Contingencies - $120,000)

 

16(58) SR 3006, Highway Portion Bridge
17Replacement, SR 3006 (Quarry Road)
18over Boiling Spring Run near the
19Intersection of SR 3005 (Cottontown
20Road), Greenfield Township, Project ID
2194443

 

22Project Allocation

222,000

23(Base Project Allocation - $201,000)

 

24(Land Allocation - $21,000)

 

25(59) SR 1003, Highway Portion Bridge
26Replacement, SR 1003 (Sylvan Drive)
27over Brush Run near the Intersection
28of Brush Mountain Drive (T-423),
29Frankstown Township, Hollidaysburg
30Borough, Project ID 94440

 

1Project Allocation

167,000

2(Base Project Allocation - $156,000)

 

3(Land Allocation - $11,000)

 

4(60) SR 2017, Highway Portion Bridge
5Replacement, SR 2017 (Fox Run Road)
6over Yellow Springs Run near the
7Intersection of Pole Cat Hollow Road
8(T-461), Catharine Township, Project
9ID 94441

 

10Project Allocation

125,000

11(Base Project Allocation - $116,000)

 

12(Land Allocation - $9,000)

 

13(61) SR 0022, Intersection Improvements,
14SR 0022 from the Village of Canoe
15Creek to Weller Road (T-446),
16Frankstown Township, Project ID 63586

 

17Project Allocation

1,875,000

18(Base Project Allocation - $1,875,000)

 

19(62) SR 4023, Resurface, SR 4023 (Tipton
20Road) from SR 1001 (Pleasant Valley
21Boulevard) to the Railroad Crossing,
22Antis Township, Project ID 96336

 

23Project Allocation

115,000

24(Base Project Allocation - $115,000)

 

25(63) SR 4023, Resurface, SR 4023 (Tipton
26Road) from SR 4025 (Grazierville Road)
27to the Clearfield County Line, Antis
28and Snyder Townships, Project ID 96337

 

29Project Allocation

1,000,000

30(Base Project Allocation - $1,000,000)

 

1(64) SR 0764, Resurface, on PA 764 from
2Sugar Run Road (SR 4002) to Pleasant
3Valley Boulevard (SR 1001) and on SR
44010 (17th Street) from 12th Avenue to
5SR 1021 (Osgood Drive), Allegheny
6Township, City of Altoona, Logan
7Township, Project ID 91625

 

8Project Allocation

816,000

9(Base Project Allocation - $780,000)

 

10(Design & Contingencies - $36,000)

 

11(65) SR 0036, Highway Reconstruction, PA
1236 from Bedford County Line to T-374
13Old PA 36 Road, Blair and Freedom
14Townships, Project ID 88548

 

15Project Allocation

200,000

16(Base Project Allocation - $200,000)

 

17(66) SR 3010, Resurface, SR 3010 (Poplar
18Run Road) from Sleigh Hollow Road to
19SR 3003 (Puzzletown Road), Freedom and
20Juniata Townships, Project ID 96348

 

21Project Allocation

600,000

22(Base Project Allocation - $600,000)

 

23(67) SR 3012, Resurface, on SR 3012 (Old
24US 22) from Mule Shoe Tunnel to PA
25764, Allegheny and Juniata Townships,
26Project ID 91621

 

27Project Allocation

300,000

28(Base Project Allocation - $300,000)

 

29(68) SR 4010, Resurface, SR 4010 from 5th
30Avenue to Pleasant Valley Boulevard,

 

1City of Altoona, Project ID 91620

 

2Project Allocation

76,000

3(Base Project Allocation - $76,000)

 

4(69) SR 4015, Highway Portion Bridge
5Replacement, SR 4015 (Bellwood Road)
6over Riggles Gap Run near the
7Intersection of SR 4018 (Lower Riggles
8Gap Road), Antis Township, Project ID
994446

 

10Project Allocation

264,000

11(Base Project Allocation - $258,000)

 

12(Land Allocation - $6,000)

 

13(70) SR 0865, Highway Reconstruction, PA
14865 from North 2nd Street to Cambria
15County Line, Antis Township and
16Bellwood Borough, Project ID 91618

 

17Project Allocation

400,000

18(Base Project Allocation - $400,000)

 

19(71) SR 4010, Highway Restoration, SR
204010 (17th Street) from SR 1001
21(Pleasant Valley Boulevard) to SR 1021
22(Osgood Drive), Logan Township,
23Project ID 94445

 

24Project Allocation

690,000

25(Base Project Allocation - $690,000)

 

26(72) SR 4010, Highway Reconstruction,
2717th Street to PA 36, between 5th and
28Pleasant Valley Boulevard, City of
29Altoona, Logan Township, Project ID
3092759

 

1Project Allocation

1,500,000

2(Base Project Allocation - $1,500,000)

 

3(73) SR 0036, Resurface, PA 36 (Broad
4Avenue) from PA 36 (Union Avenue) to
524th Street, City of Altoona, Project
6ID 96333

 

7Project Allocation

135,000

8(Base Project Allocation - $135,000)

 

9(74) SR 4027, Resurface, SR 4027 from PA
10350 to Centre County Line, Snyder
11Township, Project ID 92744

 

12Project Allocation

330,000

13(Base Project Allocation - $330,000)

 

14(75) SR 4010, Highway Reconstruction, SR
154010 from Pleasant Valley Boulevard to
16I-99 Ramps at 17th Street Interchange,
17Logan Township, City of Altoona,
18Project ID 92745

 

19Project Allocation

450,000

20(Base Project Allocation - $450,000)

 

21(76) SR 2015, Resurface, SR 2015 from PA
22866 to Fox Run Road (SR 2017),
23Catharine Township and Williamsburg
24Borough, Project ID 92746

 

25Project Allocation

80,000

26(Base Project Allocation - $80,000)

 

27(77) SR 0453, Stabilize Rockfall Area,
28along PA 453 from Schoch Hollow Road
29(T-510) continuing for 3.0 Miles West,
30Snyder Township, Project ID 95291

 

1Project Allocation

1,366,000

2(Base Project Allocation - $1,201,000)

 

3(Land Allocation - $40,000)

 

4(Design & Contingencies - $125,000)

 

5(78) SR 0219, Safety Improvement,
6Intersections of 6th and 7th Avenues
7with Union Avenue, 22nd Street, 12th
8Street, 8th Street and 7th Street,
9City of Altoona, Project ID 88198

 

10Project Allocation

150,000

11(Base Project Allocation - $150,000)

 

12(79) SR 0022, Intersection Improvement,
13US 22 at the Juniata Street and
14Allegheny Street Intersection,
15Hollidaysburg Borough, Project ID
1698785

 

17Project Allocation

7,751,000

18(Base Project Allocation - $6,501,000)

 

19(Land Allocation - $250,000)

 

20(Design & Contingencies - $1,000,000)

 

21(80) SR 0022, Intersection Improvement,
22US 22 at the PA 36 Intersection,
23Hollidaysburg Borough, Project ID
2498783

 

25Project Allocation

1,352,000

26(Base Project Allocation - $1,000,000)

 

27(Land Allocation - $201,000)

 

28(Design & Contingencies - $151,000)

 

29(81) I-99, Reconstruction, I-99 from the
30Bedford County Line to the Centre

 

1County Line, Various Municipalities,
2Project ID 0

 

3Project Allocation

166,180,000

4(Base Project Allocation -
5$166,180,000)

 

6(82) SR 0022, Reconstruction and Safety
7Improvements, US 22 from Allegheny
8Township Line East to the Wye
9Switches, Allegheny and Blair
10Townships and Duncansville Borough,
11Project ID 98782

 

12Project Allocation

250,000

13(Base Project Allocation - $150,000)

 

14(Design & Contingencies - $100,000)


15Section 308. Bradford County.

16Projects are as follows:

 

17(1) (Reserved).

 

18(2) SR 0014, Highway Portion Bridge
19Replacement, SR 0014 over Tributary of
20South Creek, Columbia Township,
21Project ID 91435

 

22Project Allocation

1,713,000

23(Base Project Allocation - $1,574,000)

 

24(Land Allocation - $50,000)

 

25(Design & Contingencies - $89,000)

 

26(3) SR 0414, Resurface Roadway, SR 0414
27from SR 0014 to Little Street, Canton
28Borough, Project ID 97497

 

29Project Allocation

400,000

30(Base Project Allocation - $400,000)

 

1(4) SR 0187, Resurface, SR 0187 from
2Wysox to SR 0467, Segments 0510/0000
3to 0600/2773, Rome and Wysox
4Townships, Project ID 97685

 

5Project Allocation

3,945,000

6(Base Project Allocation - $3,925,000)

 

7(Design & Contingencies - $20,000)

 

8(5) SR 0014, Highway Portion Bridge
9Replacement, SR 0014 over Tributary of
10South Creek, South Creek Township,
11Project ID 94631

 

12Project Allocation

990,000

13(Base Project Allocation - $897,000)

 

14(Land Allocation - $34,000)

 

15(Design & Contingencies - $59,000)

 

16(6) SR 0014, Roadway Reconstruction, SR
170014 from Sullivan Street to West
18Tioga Street, Canton Borough, Project
19ID 97496

 

20Project Allocation

250,000

21(Base Project Allocation - $250,000)

 

22(7) SR 2009, Highway Portion Bridge
23Rehabilitation, SR 2009 (Ambrosious
24Road) over Panther Lick Run, Wilmot
25Township, Project ID 89971

 

26Project Allocation

942,000

27(Base Project Allocation - $760,000)

 

28(Design & Contingencies - $182,000)

 

29(8) SR 0006, Resurface, SR 0006 from Lime
30Hill Road to Wyalusing, Segments

 

10860/0200 to 0950/0434, Wyalusing
2Borough and Wyalsuing Township,
3Project ID 97681

 

4Project Allocation

2,046,000

5(Base Project Allocation - $2,025,000)

 

6(Design & Contingencies - $21,000)

 

7(9) SR 0467, Resurface, SR 0467 from SR
80187 to SR 1010, Segments 0010/0000 to
90072/0483, Orwell and Rome Townships,
10Project ID 97687

 

11Project Allocation

1,346,000

12(Base Project Allocation - $1,326,000)

 

13(Design & Contingencies - $20,000)

 

14(10) SR 2027, Resurface, SR 2027 from US
15220 to US 6, Segments 0010/0000 to
160040/1653, Towanda Borough and Towanda
17Township, Project ID 97690

 

18Project Allocation

3,436,000

19(Base Project Allocation - $3,415,000)

 

20(Design & Contingencies - $21,000)

 

21(11) SR 0706, Resurface, PA 706 from
22Pearl Street to SR 1004, Segments
230020/0571 to 0090/0000, Wyalusing
24Borough and Wyalusing Township,
25Project ID 97691

 

26Project Allocation

789,000

27(Base Project Allocation - $789,000)

 

28(12) SR 1043, Roadway Soil Slide Repair,
29SR 1043 in the Sheshequin Narrows, SR
301043, Segments/Offset 0220/0282 to

 

10230/0736, Sheshequin Township,
2Project ID 93946

 

3Project Allocation

686,000

4(Base Project Allocation - $686,000)

 

5(13) SR 1016, Resurface, SR 1016 from SR
61041 (Valley View Road) to SR 1035
7(Barner Road), Sheshequin and Wysox
8Townships, Project ID 97697

 

9Project Allocation

76,000

10(Base Project Allocation - $76,000)

 

11(14) SR 3009, Resurface, SR 3009 from PA
12414 to SR 3020, Burlington, Monroe and
13Towanda Townships, Project ID 97693

 

14Project Allocation

531,000

15(Base Project Allocation - $510,000)

 

16(Design & Contingencies - $21,000)

 

17(15) SR 0414, Highway Portion Bridge
18Replacement, SR 0414 over Branch of
19Towanda Creek, BMS 08-0414-0250-0000,
20Leroy Township, Project ID 89968

 

21Project Allocation

2,140,000

22(Base Project Allocation - $2,140,000)

 

23(16) SR 0220, Roadway Intersection
24Improvement, Intersection of US 220
25and SR 4018 (Wolcott Hollow Road) US
26220, Segments/Offset 0720/0200 to
270720/1000 SR 4018 Segments/Offset
280220/1200 to 0220/1572, Athens
29Township, Project ID 93736

 

30Project Allocation

385,000

1(Base Project Allocation - $229,000)

 

2(Design & Contingencies - $156,000)

 

3(17) SR 0514, Highway Portion Bridge
4Replacement, SR 0514 over Tributary of
5Sugar Creek, Troy Township, Project ID
689728

 

7Project Allocation

1,241,000

8(Base Project Allocation - $1,241,000)

 

9(18) SR 0014, Resurface Roadway, SR 0014
10from Canton (SR 0414) to Alba Creek,
11Canton Borough, Canton Township, Alba
12Borough, Project ID 87976

 

13Project Allocation

2,044,000

14(Base Project Allocation - $2,034,000)

 

15(Design & Contingencies - $10,000)

 

16(19) SR 3018, Reconstruct Roadway, SR
173018 from Towanda Borough Line to US
186, Segment/Offset 0090/0000 through
190100/0704, Towanda Borough, Project ID
2093549

 

21Project Allocation

1,677,000

22(Base Project Allocation - $1,501,000)

 

23(Land Allocation - $50,000)

 

24(Design & Contingencies - $126,000)

 

25(20) SR 0006, Resurface Roadway, US 6
26from Plank Road to SR 2027,
27Segments/Offset 0580/0091 to
280604/1164, Towanda Borough, Project ID
2993548

 

30Project Allocation

316,000

1(Base Project Allocation - $105,000)

 

2(Land Allocation - $50,000)

 

3(Design & Contingencies - $161,000)

 

4(21) SR 0006, Reconstruct Roadway, US 6
5and US 220 Interchange,
6Segments/Offset 0510/1340 through
70520/0430, North Towanda Township,
8Project ID 93547

 

9Project Allocation

272,000

10(Design & Contingencies - $272,000)

 

11(22) SR 1043, Resurface, SR 1043 from the
12Sheshequin Narrows to SR 1056 (Front
13Street), Athens Township, Project ID
1497701

 

15Project Allocation

308,000

16(Base Project Allocation - $308,000)

 

17(23) SR 0006, Highway Portion Bridge
18Preservation, Various State Routes,
19Various Municipalities in Bradford and
20Tioga Counties, Project ID 97579

 

21Project Allocation

2,051,000

22(Base Project Allocation - $1,766,000)

 

23(Design & Contingencies - $285,000)

 

24(24) SR 0014, Highway Portion Bridge
25Rehabilitation, PA 14 over Tributary
26of Towanda Creek, Canton Township,
27Project ID 97599

 

28Project Allocation

572,000

29(Base Project Allocation - $400,000)

 

30(Design & Contingencies - $172,000)

 

1(25) SR 0220, Highway Portion Bridge
2Replacement, SR 0220 over Cash Creek,
3BMS 08-0220-0560-1158, Ulster
4Township, Project ID 96677

 

5Project Allocation

355,000

6(Design & Contingencies - $355,000)

 

7(26) SR 0014, Highway Portion Bridge
8Rehabilitation, PA 14 over South
9Creek, South Creek Township, Project
10ID 97598

 

11Project Allocation

1,121,000

12(Base Project Allocation - $800,000)

 

13(Design & Contingencies - $321,000)

 

14(27) SR 4022, Highway Portion Bridge
15Rehabilitation, SR 4022 over Chemung
16River, Athens Township, Project ID
1776157

 

18Project Allocation

10,400,000

19(Base Project Allocation -
20$10,400,000)

 

21(28) SR 0220, Intersection Improvement,
22US 220 at the Intersection with PA
23199, Athens Township, Project ID 97630

 

24Project Allocation

1,800,000

25(Base Project Allocation - $1,800,000)

 

26(29) SR 1059, Resurface, SR 1059 from
27Runyon Road to SR 1038 (Warren Center
28Road), Warren Township, Project ID
2997723

 

30Project Allocation

217,000

1(Base Project Allocation - $217,000)

 

2(30) SR 1041, Highway Portion Bridge
3Painting, SR 1041 (James Street) over
4North Branch Susquehanna River, North
5Towanda and Wysox Townships, Project
6ID 97635

 

7Project Allocation

2,011,000

8(Base Project Allocation - $2,001,000)

 

9(Design & Contingencies - $10,000)

 

10(31) SR 0220, Safety Improvements, SR
110220 and SR 2027 Intersection, Towanda
12Township, Project ID 97972

 

13Project Allocation

475,000

14(Base Project Allocation - $475,000)

 

15(32) SR 3008, Highway Portion Bridge
16Rehabilitation, SR 3008 (Southside
17Road) over Towanda Creek, BMS 08-3008-
180350-1523, Franklin Township, Project
19ID 87922

 

20Project Allocation

1,044,000

21(Base Project Allocation - $934,000)

 

22(Design & Contingencies - $110,000)

 

23(33) SR 1012, Highway Portion Bridge
24Replacement, SR 1012 over a Branch of
25Rummerfield Creek, Herrick Township,
26Project ID 97567

 

27Project Allocation

362,000

28(Base Project Allocation - $231,000)

 

29(Land Allocation - $70,000)

 

30(Design & Contingencies - $61,000)

 

1(34) SR 0006, Highway Portion Bridge
2Rehabilitation, US 6 East of County
3Home over Mill Creek, West Burlington
4Township, Project ID 97585

 

5Project Allocation

750,000

6(Base Project Allocation - $700,000)

 

7(Design & Contingencies - $50,000)

 

8(35) SR 0006, Highway Portion Bridge
9Replacement, US 6 over Wallace Run,
10Burlington Township, Project ID 5314

 

11Project Allocation

270,000

12(Land Allocation - $27,000)

 

13(Design & Contingencies - $243,000)

 

14(36) SR 1056, Highway Portion Bridge
15Rehabilitation, SR 1056 over Satterlee
16Creek, Litchfield Township, Project ID
1797637

 

18Project Allocation

572,000

19(Base Project Allocation - $471,000)

 

20(Design & Contingencies - $101,000)

 

21(37) SR 1067, Highway Portion Bridge
22Rehabilitation, SR 1067 over Tributary
23of Satterlee Creek, Litchfield
24Township, Project ID 97640

 

25Project Allocation

371,000

26(Base Project Allocation - $271,000)

 

27(Design & Contingencies - $100,000)

 

28(38) SR 4013, Highway Portion Bridge
29Rehabilitation, SR 4013 over Three
30Falls Run, Ridgebury Township, Project

 

1ID 97642

 

2Project Allocation

731,000

3(Base Project Allocation - $500,000)

 

4(Design & Contingencies - $231,000)

 

5(39) SR 4027, Highway Portion Bridge
6Rehabilitation, SR 4027 over Bucks
7Creek, Ridgebury Township, Project ID
897644

 

9Project Allocation

872,000

10(Base Project Allocation - $721,000)

 

11(Design & Contingencies - $151,000)

 

12(40) SR 4013, Highway Portion Bridge
13Rehabilitation, SR 4013 over Bentley
14Creek, Ridgebury Township, Project ID
155315

 

16Project Allocation

2,850,000

17(Base Project Allocation - $2,831,000)

 

18(Design & Contingencies - $19,000)

 

19(41) SR 0006, Resurface, US 6 from Tioga
20County Line to SR 3038 (Bailey Hill
21Road), Segments 0010/0000 to
220040/0940, Columbia Township and
23Sylvania Borough, Project ID 97559

 

24Project Allocation

3,130,000

25(Base Project Allocation - $2,700,000)

 

26(Land Allocation - $25,000)

 

27(Design & Contingencies - $405,000)

 

28(42) SR 0187, Highway Portion Bridge
29Rehabilitation, PA 187 over Hollow
30Run, Wysox Township, Project ID 97582

 

1Project Allocation

65,000

2(Base Project Allocation - $65,000)

 

3(43) SR 0187, Highway Portion Bridge
4Replacement, PA 187 over Parks Creek,
5Rome Township, Project ID 97628

 

6Project Allocation

2,421,000

7(Base Project Allocation - $2,001,000)

 

8(Design & Contingencies - $420,000)

 

9(44) 0014, Highway Portion Bridge
10Replacement, PA 14 over a Tributary of
11Alba Creek, Canton Township, Project
12ID 97618

 

13Project Allocation

1,421,000

14(Base Project Allocation - $1,401,000)

 

15(Design & Contingencies - $20,000)

 

16(45) SR 0187, Highway Portion Bridge
17Rehabilitation, PA 187 over Wysox
18Creek, Orwell Township, Project ID
1997627

 

20Project Allocation

1,021,000

21(Base Project Allocation - $921,000)

 

22(Design & Contingencies - $100,000)

 

23(46) SR 0199, Mill and Resurface, SR 199
24from Main Street to Satterlee Street,
25Segments/Offset 0040/0000 to
260060/1555, Athens Borough, Project ID
2787985

 

28Project Allocation

2,007,000

29(Base Project Allocation - $1,901,000)

 

30(Design & Contingencies - $106,000)

 

1(47) SR 0006, Mill and Resurface, SR 0006
2Sugar Creek to Tomjack Creek,
3Segments/Offset 0230/0617 to
40370/1947, Burlington Borough, Troy
5and West Burlington Townships, Project
6ID 87984

 

7Project Allocation

1,639,000

8(Base Project Allocation - $1,619,000)

 

9(Design & Contingencies - $20,000)

 

10(48) SR 0006, Mill and Resurface, SR
110006, Segments 0180/0083 to 0230/0425,
12Troy Township, Project ID 87973

 

13Project Allocation

2,132,000

14(Base Project Allocation - $1,908,000)

 

15(Design & Contingencies - $224,000)

 

16(49) SR 0187, Highway Portion Bridge
17Rehabilitation, PA 187 over Tributary
18of Wysox Creek, Rome Borough, Project
19ID 97621

 

20Project Allocation

739,000

21(Base Project Allocation - $519,000)

 

22(Design & Contingencies - $220,000)

 

23(50) SR 0187, Highway Portion Bridge
24Rehabilitation, PA 187 over Dry Run
25Creek, Wysox Township, Project ID
2697619

 

27Project Allocation

921,000

28(Base Project Allocation - $700,000)

 

29(Design & Contingencies - $221,000)

 

30(51) SR 4015, Resurface Roadway, SR 4015

 

1from SR 4017 to SR 3019, Troy and West
2Burlington Townships, Project ID 99094

 

3Project Allocation

516,000

4(Base Project Allocation - $476,000)

 

5(Design & Contingencies - $40,000)

 

6(52) SR 0414, Highway Portion Bridge
7Rehabilitation, PA 414 over Tributary
8of Towanda Creek, BMS 08-0414-0220-
90000, Leroy Township, Project ID 98967

 

10Project Allocation

600,000

11(Base Project Allocation - $600,000)

 

12(53) SR 0187, Highway Portion Bridge
13Replacement, PA 187 over Tributary of
14North Branch of Susquehanna River, BMS
1508-0187-0320-0000, Terry Township,
16Project ID 98937

 

17Project Allocation

1,400,000

18(Base Project Allocation - $1,400,000)

 

19(54) SR 3036, Resurface Roadway, SR 3036
20from SR 0014 to SR 3034, Troy
21Township, Project ID 99091

 

22Project Allocation

238,000

23(Base Project Allocation - $212,000)

 

24(Design & Contingencies - $26,000)

 

25(55) SR 0414, Highway Portion Bridge
26Rehabilitation, PA 414 over Mill
27Creek, BMS 08-0414-0040-0000, Canton
28Township, Project ID 98965

 

29Project Allocation

600,000

30(Base Project Allocation - $600,000)

 

1(56) SR 4016, Resurface Roadway, SR 4016
2from the Tioga County Line to SR 4037,
3Columbia Township, Project ID 99095

 

4Project Allocation

317,000

5(Base Project Allocation - $292,000)

 

6(Design & Contingencies - $25,000)

 

7(57) SR 0006, Resurface Roadway, SR 0006
8from SR 1012 to River Road, Standing
9Stone and Wysox Townships, Project ID
1098963

 

11Project Allocation

146,000

12(Base Project Allocation - $91,000)

 

13(Design & Contingencies - $55,000)

 

14(58) SR 4030, Resurface Roadway, SR 4030
15from SR 0014 to the New York State
16Line, Ridgebury and South Creek
17Townships, Project ID 99101

 

18Project Allocation

503,000

19(Base Project Allocation - $463,000)

 

20(Design & Contingencies - $40,000)

 

21(59) SR 0187, Highway Portion Bridge
22Replacement, PA 187 over Wysox Creek,
23Rome Township, Project ID 99278

 

24Project Allocation

2,400,000

25(Base Project Allocation - $2,400,000)

 

26(60) SR 0187 Highway Portion Bridge
27Replacement, PA 187 over Tributary of
28Wysox Creek, BMS 08-0187-0730-0000,
29Orwell Township, Project ID 98951

 

30Project Allocation

1,400,000

1(Base Project Allocation - $1,400,000)

 

2(61) SR 0187, Highway Portion Bridge
3Replacement, PA 187 over Tributary of
4Wysox Creek, BMS 08-0187-0780-0047,
5Windham Township, Project ID 98953

 

6Project Allocation

1,400,000

7(Base Project Allocation - $1,400,000)

 

8(62) SR 0220, Highway Portion Bridge
9Rehabilitation, US 220 over Ladds
10Creek, BMS 08-0220-0090-0114, New
11Albany Borough, Project ID 98955

 

12Project Allocation

600,000

13(Base Project Allocation - $600,000)

 

14(63) SR 0006, Resurface Roadway, SR 0006
15from SR 0187 to SR 1012, Wysox
16Township, Project ID 98958

 

17Project Allocation

231,000

18(Base Project Allocation - $140,000)

 

19(Design & Contingencies - $91,000)

 

20(64) SR 3034, Resurface Roadway, SR 3034
21from SR 0014 to SR 0006, Troy
22Township, Project ID 99090

 

23Project Allocation

551,000

24(Base Project Allocation - $510,000)

 

25(Design & Contingencies - $41,000)

 

26(65) SR 0154, Resurface Roadway, SR 0154
27from Sullivan County Line to Top End
28Road, Canton Township, Project ID
2998972

 

30Project Allocation

34,000

1(Base Project Allocation - $12,000)

 

2(Design & Contingencies - $22,000)

 

3(66) SR 0006, Intersection Improvement,
4US 6 and PA 14 Intersection, Troy
5Township, Project ID 98541

 

6Project Allocation

1,250,000

7(Base Project Allocation - $1,250,000)

 

8(67) SR 1040, Resurface Roadway, SR 1040
9from SR 1049 to New York Line, Warren
10and Windham Townships, Project ID
1198982

 

12Project Allocation

876,000

13(Base Project Allocation - $815,000)

 

14(Design & Contingencies - $61,000)

 

15(68) SR 1023, Resurface Roadway, SR 1026
16from SR 1012 to SR 0467, Rome and
17Wysox Townships, Project ID 98981

 

18Project Allocation

346,000

19(Base Project Allocation - $315,000)

 

20(Design & Contingencies - $31,000)

 

21(69) SR 0414, Resurface Roadway, SR 0414
22from Little Street to McFadden Road,
23Canton Township, Project ID 98980

 

24Project Allocation

95,000

25(Base Project Allocation - $55,000)

 

26(Design & Contingencies - $40,000)

 

27(70) SR 0199, Resurface Roadway, SR 0199
28from Norfolk Southern Railroad to
29Chemung River, Athens Borough, Athens
30Township, Project ID 98979

 

1Project Allocation

80,000

2(Base Project Allocation - $49,000)

 

3(Design & Contingencies - $31,000)

 

4(71) SR 0187, Resurface Roadway, SR 0187
5from Thompson Hill Road to SR 1042,
6Orwell and Windham Townships, Project
7ID 98978

 

8Project Allocation

163,000

9(Base Project Allocation - $103,000)

 

10(Design & Contingencies - $60,000)

 

11(72) SR 0014, Resurface Roadway, SR 0014
12from SR 0006 to Old Kennedy Road,
13Columbia Township, Troy Borough, Troy
14Township, Project ID 98964

 

15Project Allocation

84,000

16(Base Project Allocation - $53,000)

 

17(Design & Contingencies - $31,000)

 

18(73) SR 0154, Resurface Roadway, SR 0154
19from Top End Road to SR 0414, Canton
20Borough, Canton Township, Project ID
2198973

 

22Project Allocation

190,000

23(Base Project Allocation - $114,000)

 

24(Design & Contingencies - $76,000)

 

25(74) SR 1058, Highway Portion Bridge
26Replacement, SR 1058 over Sackett Run,
27Litchfield Township, Project ID 99360

 

28Project Allocation

230,000

29(Base Project Allocation - $230,000)

 

30(75) SR 0414, Highway Portion Bridge

 

1Rehabilitation, PA 414 over Gulf
2Brook, BMS 08-0414-0200-0000, Leroy
3Township, Project ID 98970

 

4Project Allocation

700,000

5(Base Project Allocation - $700,000)

 

6(76) SR 0014, Resurface Roadway, SR 0014
7from Thompson Hill Road to the New
8York State Line, South Creek Township,
9Project ID 98969

 

10Project Allocation

157,000

11(Base Project Allocation - $97,000)

 

12(Design & Contingencies - $60,000)

 

13(77) SR 3027, Resurface Roadway, SR 3027
14from Canton Borough to Windfall Road,
15Alba Borough, Canton Township, Project
16ID 99089

 

17Project Allocation

768,000

18(Base Project Allocation - $712,000)

 

19(Design & Contingencies - $56,000)

 

20(78) SR 0014, Resurface Roadway, SR 0014
21from Snedekerville Road to Thompson
22Hill Road, Columbia and South Creek
23Townships, Project ID 98966

 

24Project Allocation

149,000

25(Base Project Allocation - $88,000)

 

26(Design & Contingencies - $61,000)

 

27(79) SR 0706, Resurface, SR 0706 from
28Anderson Road to Susquehanna County
29Line, Segments 0180/0100 to 0280/1639,
30Stevens Township, Project ID 99351

 

1Project Allocation

2,046,000

2(Base Project Allocation - $2,025,000)

 

3(Design & Contingencies - $21,000)

 

4(80) SR 0220, Highway Portion Bridge
5Preservation, Bradford County Bridges
6in Various Municipalities (SR 0220),
7Athens Borough, Athens Township, North
8Towanda Township, Towanda Borough,
9Towanda Township, Project ID 101339

 

10Project Allocation

249,000

11(Base Project Allocation - $239,000)

 

12(Design & Contingencies - $10,000)

 

13(81) SR 0187, Resurface Roadway, SR 0187
14from SR 0467 to Taylor Hill Road, Rome
15Borough, Rome Township, Project ID
1698975

 

17Project Allocation

131,000

18(Base Project Allocation - $85,000)

 

19(Design & Contingencies - $46,000)

 

20(82) SR 0006, Safety Improvement, SR
210006, SR 0014 and SR 0049, Various
22Municipalities in Bradford and Tioga
23Counties, Project ID 98825

 

24Project Allocation

330,000

25(Base Project Allocation - $300,000)

 

26(Design & Contingencies - $30,000)

 

27(83) SR 4014, Highway Portion Bridge
28Rehabilitation, State Route 4014 over
29Springfield Creek, BMS 08-4014-0110-
300336, Springfield Township, Project ID

 

198912

 

2Project Allocation

65,000

3(Base Project Allocation - $65,000)

 

4(84) SR 1058, Highway Portion Bridge
5Rehabilitation, SR 1058 over a
6Tributary of Satterlee Creek,
7Litchfield Township, Project ID 98910

 

8Project Allocation

305,000

9(Base Project Allocation - $300,000)

 

10(Design & Contingencies - $5,000)

 

11(85) SR 0220, Resurface, US 220
12Southbound from New York State Line to
13SR 0199, Athens Borough, Athens
14Township, South Waverly Borough,
15Project ID 101109

 

16Project Allocation

3,012,000

17(Base Project Allocation - $3,012,000)

 

18(86) SR 0006, Intersection Improvement,
19US 6 and PA 187 Intersection, Wysox
20Township, Project ID 101100

 

21Project Allocation

4,550,000

22(Base Project Allocation - $4,550,000)

 

23(87) SR 1049, Highway Portion Bridge
24Replacement, SR 1049 over Pendleton
25Creek, Warren Township, Project ID
26102032

 

27Project Allocation

281,000

28(Base Project Allocation - $175,000)

 

29(Land Allocation - $46,000)

 

30(Design & Contingencies - $60,000)

 

1(88) SR 1040, Highway Portion Bridge
2Replacement, SR 1040 over Prince
3Hollow Run, Warren Township, Project
4ID 99358

 

5Project Allocation

230,000

6(Base Project Allocation - $230,000)

 

7(89) SR 0006, Resurface, SR 0006 from Old
8Route 6 to Wyoming County Line,
9Segments 1100/0100 to 1150/0665,
10Tuscarora Township, Project ID 99336

 

11Project Allocation

1,271,000

12(Base Project Allocation - $1,250,000)

 

13(Design & Contingencies - $21,000)

 

14(90) SR 0187, Highway Portions Bridge
15Replacement, PA 187 over Tributary of
16Sugar Creek, BMS 08-0187-0030-0000,
17Wilmot Township, Project ID 98916

 

18Project Allocation

1,400,000

19(Base Project Allocation - $1,400,000)

 

20(91) SR 1066, Resurface, SR 1066 from
21Elmira Street to Keystone Avenue,
22Athens Township, Sayre Borough,
23Project ID 99218

 

24Project Allocation

105,000

25(Base Project Allocation - $55,000)

 

26(Design & Contingencies - $50,000)

 

27(92) SR 0006, Resurface, SR 0006 from
28River Road to Tracy Road, Segments
290720/2414 to 0750/1750, Standing Stone
30Township, Project ID 99311

 

1Project Allocation

505,000

2(Base Project Allocation - $485,000)

 

3(Design & Contingencies - $20,000)

 

4(93) SR 4031, Highway Portion Bridge
5Replacement, SR 4031 over Tributary of
6Beckwith Creek, Wells Township,
7Project ID 99309

 

8Project Allocation

500,000

9(Base Project Allocation - $500,000)

 

10(94) SR 0467, Highway Portion Bridge
11Replacement, PA 467 over Tributary of
12Johnson Creek, Orwell Township,
13Project ID 99284

 

14Project Allocation

800,000

15(Base Project Allocation - $800,000)

 

16(95) SR 0187, Highway Portion Bridge
17Replacement, PA 187 over Durrell
18Creek, Asylum Township, Project ID
1999281

 

20Project Allocation

1,507,000

21(Base Project Allocation - $1,400,000)

 

22(Land Allocation - $61,000)

 

23(Design & Contingencies - $46,000)

 

24(96) SR 2012, Highway Portion Bridge
25Rehabilitation, SR 2012 over Tributary
26of Susquehanna River, Terry Township,
27Project ID 99288

 

28Project Allocation

300,000

29(Base Project Allocation - $300,000)

 

30(97) SR 0220, Guide Sign Update, US 220,

 

1Various Municipalities, Project ID
299158

 

3Project Allocation

75,000

4(Base Project Allocation - $75,000)

 

5(98) SR 0014, Reconstruction, PA 14 from
6SR 3028 (Windfall Road) to 0.5 Mile
7South of Tennessee Gas Road, Alba
8Borough, Troy Township, Project ID
999156

 

10Project Allocation

2,800,000

11(Base Project Allocation - $2,800,000)

 

12(99) SR 3020, Highway Reconstruction, SR
133020 from State Street to Bridge
14Street, Towanda Borough, Project ID
1599146

 

16Project Allocation

1,120,000

17(Base Project Allocation - $1,120,000)

 

18(100) SR 4005, Resurface Roadway, SR 4005
19from SR 4001 to SR 4004, Smithfield
20and Ulster Townships, Project ID 99093

 

21Project Allocation

214,000

22(Base Project Allocation - $188,000)

 

23(Design & Contingencies - $26,000)

 

24(101) SR 0414, Resurface, SR 0414 from
25McFadden Road to Towanda Creek,
26Segments 0060/0000 to 0290/3350,
27Canton, Franklin and Leroy Townships,
28Project ID 99350

 

29Project Allocation

3,796,000

30(Base Project Allocation - $3,775,000)

 

1(Design & Contingencies - $21,000)

 

2(102) SR 0414, Resurface, SR 0414 from
3Towanda Creek to US 220, Segments
40300/0136 to 0480/2860, Franklin
5Township, Monroe Borough, Monroe
6Township, Project ID 99349

 

7Project Allocation

3,422,000

8(Base Project Allocation - $3,401,000)

 

9(Design & Contingencies - $21,000)

 

10(103) SR 0187, Resurface, SR 0187 from
11Moody Road to US 6, Segments 0360/0000
12to 0500/3318, Asylum and Wysox
13Townships, Project ID 99347

 

14Project Allocation

5,272,000

15(Base Project Allocation - $5,251,000)

 

16(Design & Contingencies - $21,000)

 

17(104) SR 0187, Resurface, SR 0187 from SR
182012 to Moody Road, Segments 0290/0000
19to 0350/2524, Asylum and Terry
20Townships, Project ID 99345

 

21Project Allocation

1,207,000

22(Base Project Allocation - $1,187,000)

 

23(Design & Contingencies - $20,000)

 

24(105) SR 4019, Highway Portion Bridge
25Rehabilitation, SR 4019 over Sugar
26Creek, BMS 08-4019-0050-2676, Columbia
27Township, Project ID 98914

 

28Project Allocation

65,000

29(Base Project Allocation - $65,000)

 

30(106) SR 0014, Resurface, SR 0014 from

 

1Knights Drive to US 6, Segments
20330/0000 to 0360/0713, Troy Borough,
3Troy Township, Project ID 99343

 

4Project Allocation

500,000

5(Base Project Allocation - $480,000)

 

6(Design & Contingencies - $20,000)

 

7(107) SR 0187, Highway Portion Bridge
8Rehabilitation, PA 187 over Tributary
9of Wappasening Creek, BMS 08-0187-
100840-1831, Windham Township, Project
11ID 98915

 

12Project Allocation

800,000

13(Base Project Allocation - $800,000)

 

14(108) SR 0006, Resurface, SR 0006 from
15Clagett Road to Lime Hill Road,
16Segments 0800/2845 to 0860/0200,
17Standing Stone and Wyalusing
18Townships, Project ID 99341

 

19Project Allocation

1,096,000

20(Base Project Allocation - $1,076,000)

 

21(Design & Contingencies - $20,000)

 

22(109) SR 0199, Reconstruction, SR 0199
23from Satterlee Street to Cayuta
24Street, Athens and Sayre Boroughs,
25Project ID 99157

 

26Project Allocation

5,000,000

27(Base Project Allocation - $5,000,000)

 

28(110) SR 0006, Resurface, Farmers Valley
29Road to Main Street, Troy and Columbia
30Townships, Troy Borough, Segments

 

10080/1275 to 0150/0010, Columbia
2Township, Troy Borough, Troy Township,
3Project ID 99339

 

4Project Allocation

1,947,000

5(Base Project Allocation - $1,926,000)

 

6(Design & Contingencies - $21,000)

 

7(111) SR 0187, Highway Portion Bridge
8Replacement, PA 187 over Tributary of
9North Branch of Susquehanna River, BMS
1008-0187-0300-0009, Terry Township,
11Project ID 98920

 

12Project Allocation

1,400,000

13(Base Project Allocation - $1,400,000)

 

14(112) SR 0187, Highway Portion Bridge
15Replacement, PA 187 over Rock Cabin
16Creek, BMS 08-0187-0050-0035, Wilmot
17Township, Project ID 98917

 

18Project Allocation

1,400,000

19(Base Project Allocation - $1,400,000)

 

20(113) SR 1059, Highway Portion Bridge
21Replacement, SR 1059 over Wappassening
22Creek, Warren Township, Project ID
2398535

 

24Project Allocation

1,220,000

25(Base Project Allocation - $1,220,000)

 

26(114) SR 0006, Resurface, US 6 from Main
27Street to Sugar Creek, Troy Borough,
28Troy Township, Project ID 99148

 

29Project Allocation

2,800,000

30(Base Project Allocation - $2,800,000)

 

1(115) SR 0367, Highway Portion Bridge
2Replacement, PA 367 over Tuscarora
3Creek, Tuscarora Township, Project ID
498518

 

5Project Allocation

1,900,000

6(Base Project Allocation - $1,900,000)

 

7(116) SR 0467, Highway Portion Bridge
8Replacement, PA 467 over Tributary of
9Johnsons Creek, Orwell Township,
10Project ID 98533

 

11Project Allocation

1,400,000

12(Base Project Allocation - $1,400,00)

 

13(117) SR 1068, Resurface Roadway, SR 1068
14from SR 1069 to SR 0199, Athens
15Township, Sayre Borough, Project ID
1699073

 

17Project Allocation

68,000

18(Base Project Allocation - $42,000)

 

19(Design & Contingencies - $26,000)

 

20(118) SR 0467, Highway Portion Bridge
21Replacement, PA 467 over Tributary of
22South Creek, Rome Township, Project ID
2398530

 

24Project Allocation

1,400,000

25(Base Project Allocation - $1,400,000)

 

26(119) SR 3010, Highway Portion Bridge
27Rehabilitation, SR 3010 over Towanda
28Creek, BMS 08-3010-0010-1098, Leroy
29Township, Project ID 99070

 

30Project Allocation

700,000

1(Base Project Allocation - $700,000)

 

2(120) SR 4034, Highway Portion Bridge
3Rehabilitation, SR 4034 over Roaring
4Creek, South Creek Township, Project
5ID 99079

 

6Project Allocation

800,000

7(Base Project Allocation - $800,000)

 

8(121) SR 1069, Resurface Roadway, SR 1069
9from Elimira Street to SR 1070, South
10Waverly Borough, Project ID 99075

 

11Project Allocation

171,000

12(Base Project Allocation - $136,000)

 

13(Design & Contingencies - $35,000)

 

14(122) SR 2010, Highway Portion Bridge
15Rehabilitation, SR 2010 over Sugar
16Run, BMS 08-2010-0080-1819, Terry
17Township, Project ID 99069

 

18Project Allocation

500,000

19(Base Project Allocation - $500,000)

 

20(123) SR 4022, Highway Portion Bridge
21Rehabilitation, SR 4022 over US 220,
22Athens Township, Project ID 99076

 

23Project Allocation

1,700,000

24(Base Project Allocation - $1,700,000)

 

25(124) SR 1074, Resurface Roadway, SR 1074
26from SR 0006 to SR 0706, Wyalusing
27Borough, Project ID 99082

 

28Project Allocation

98,000

29(Base Project Allocation - $82,000)

 

30(Design & Contingencies - $16,000)

 

1(125) SR 0220, Resurface, US 220 from
2Monroeton to Dunn Road, Monroe
3Borough, Monroe and Towanda Townships,
4Project ID 99421

 

5Project Allocation

1,125,000

6(Base Project Allocation - $1,125,000)

 

7(126) SR 1070, Resurface Roadway, SR 1070
8from the New York State Line to SR
90199, Sayre and South Waverly
10Boroughs, Project ID 99077

 

11Project Allocation

72,000

12(Base Project Allocation - $42,000)

 

13(Design & Contingencies - $30,000)

 

14(127) SR 3017, Highway Portion Bridge
15Rehabilitation, SR 3017 over the North
16Branch of Towanda Creek, BMS 08-3017-
170010-0302, Granville Township, Project
18ID 99072

 

19Project Allocation

600,000

20(Base Project Allocation - $600,000)

 

21(128) SR 1072, Resurface Roadway, SR 1072
22from River Road to Yanuzzi Drive,
23South Waverly Borough, Project ID
2499080

 

25Project Allocation

87,000

26(Base Project Allocation - $72,000)

 

27(Design & Contingencies - $15,000)

 

28(129) SR 1049, Highway Portion Bridge
29Rehabilitation, SR 1049 over Russel
30Run, BMS 08-1049-0240-0801, Windham

 

1Township, Project ID 99063

 

2Project Allocation

1,000,000

3(Base Project Allocation - $1,000,000)

 

4(130) SR 3012, Resurface Roadway, SR 3012
5from SR 0014 to SR 0154, Canton
6Township, Project ID 99084

 

7Project Allocation

436,000

8(Base Project Allocation - $405,000)

 

9(Design & Contingencies - $31,000)

 

10(131) SR 3020, Resurface Roadway, SR 3020
11from SR 3018 to State Street, Towanda
12Borough, Towanda Township, Project ID
1399085

 

14Project Allocation

349,000

15(Base Project Allocation - $318,000)

 

16(Design & Contingencies - $31,000)

 

17(132) SR 1049, Resurface Roadway, SR 1049
18from Jackson Road to SR 0187, Warren
19and Windham Townships, Project ID
2099026

 

21Project Allocation

193,000

22(Base Project Allocation - $118,000)

 

23(Design & Contingencies - $75,000)

 

24(133) SR 0367, Highway Portion Bridge
25Replacement, PA 367 over Tributary of
26Tuscarora Creek, Tuscarora Township,
27Project ID 98516

 

28Project Allocation

1,400,000

29(Base Project Allocation - $1,400,000)

 

30(134) SR 1043, Resurface Roadway, SR 1043

 

1from Potter Road to the New York State
2Line, Athens and Litchfield Townships,
3Project ID 99018

 

4Project Allocation

182,000

5(Base Project Allocation - $112,000)

 

6(Design & Contingencies - $70,000)

 

7(135) SR 1021, Highway Portion Bridge
8Replacement, SR 1021 over Rummerfield
9Creek, Standing Stone Township,
10Project ID 98534

 

11Project Allocation

1,200,000

12(Base Project Allocation - $1,200,000)

 

13(136) SR 1043, Resurface Roadway, SR 1043
14from Hornbrook Park Road to Eastern
15Industries, Sheshequin Township,
16Project ID 99016

 

17Project Allocation

159,000

18(Base Project Allocation - $98,000)

 

19(Design & Contingencies - $61,000)

 

20(137) SR 0220, Resurface, US 220 from
21Dunn Road to Tomahawk Road, North
22Towanda Township, Towanda Borough,
23Towanda Township, Project ID 99420

 

24Project Allocation

2,596,000

25(Base Project Allocation - $2,576,000)

 

26(Design & Contingencies - $20,000)

 

27(138) SR 1043, Resurface Roadway, SR 1043
28from SR 1041 to SR 1045, Sheshequin
29and Wysox Townships, Project ID 99011

 

30Project Allocation

124,000

1(Base Project Allocation - $79,000)

 

2(Design & Contingencies - $45,000)

 

3(139) SR 0414, Highway Portion Bridge
4Replacement, PA 414 over Tributary of
5Towanda Creek, Leroy Township, Project
6ID 98528

 

7Project Allocation

1,400,000

8(Base Project Allocation - $1,400,000)

 

9(140) SR 1060, Resurface Roadway, SR 1060
10from SR 1056 to SR 1056, Athens
11Township, Project ID 99028

 

12Project Allocation

165,000

13(Base Project Allocation - $143,000)

 

14(Design & Contingencies - $22,000)

 

15(141) SR 0006, Resurface, SR 0006 from
16Township Road to Old Mills Road, North
17Towanda Township, Project ID 99418

 

18Project Allocation

750,000

19(Base Project Allocation - $750,000)

 

20(142) Various, Highway Portion Bridge
21Painting, Various State Routes,
22Various Municipalities, Project ID
2397634

 

24Project Allocation

310,000

25(Base Project Allocation - $310,000)

 

26(143) Various, Highway Portion Bridge
27Rehabilitation, Various State Routes,
28Various Municipalities in Bradford,
29Sullivan and Tioga Counties, Project
30ID 97578

 

1Project Allocation

2,301,000

2(Base Project Allocation - $1,900,000)

 

3(Design & Contingencies - $401,000)

 

4(144) Various, Highway Portion Bridge
5Preservation, PA 14 over South Creek,
6US 220 over SR 3018, US 6 over
7Charleston Creek, PA 287 over Crooked
8Creek and PA 549 over Corey Creek,
9Various Municipalities in Bradford and
10Tioga Counties, Project ID 97576

 

11Project Allocation

610,000

12(Base Project Allocation - $600,000)

 

13(Design & Contingencies - $10,000)

 

14(145) Various, Highway Portion Bridge
15Preservation, Various Routes, Various
16Municipalities in Bradford and Tioga
17Counties, Project ID 87980

 

18Project Allocation

1,058,000

19(Base Project Allocation - $850,000)

 

20(Land Allocation - $130,000)

 

21(Design & Contingencies - $78,000)

 

22Section 309. Bucks County.

23Projects are as follows:

 

24(1) (Reserved).

 

25(2) SR 0001, Highway Reconstruction,
26Route 1, Neshaminy and Penndel
27Interchanges, Bensalem and Middletown
28Townships, Project ID 93445

 

29Project Allocation

20,000,000

30(Base Project Allocation -

 

1$20,000,000)

 

2(3) SR 2038, Highway Restoration, County
3Line Road, Kulp Road to PA 611,
4Horsham and Warrington Townships,
5Project ID 50634

 

6Project Allocation

4,560,000

7(Base Project Allocation - $2,444,000)

 

8(Land Allocation - $677,000)

 

9(Design & Contingencies - $1,439,000)

 

10(4) SR 0095, Restoration, Segments
110095/0330 through 0095/0505, Various,
12Project ID 92582

 

13Project Allocation

22,770,000

14(Base Project Allocation -
15$22,770,000)

 

16(5) I-95, Interchange Construction, I-95
17at Turnpike Interchange 358 (Delaware
18Valley Interchange), Bristol Township,
19Project ID 95439

 

20Project Allocation

140,000,000

21(Base Project Allocation -
22$140,000,000)

 

23(6) SR 0309, Highway Reconstruction, SR
240309 from Bucks County Line to
25Quakertown Line, Hatfield, Hilltown,
26Richland, West Rockhill Townships,
27Project ID 86923

 

28Project Allocation

10,000,000

29(Base Project Allocation -
30$10,000,000)

 

1(7) SR 0001, Highway Reconstruction,
2Route 1, Frontage Road Corridor,
3Langhorne Manor Borough, Middletown
4Township, Project ID 93446

 

5Project Allocation

10,826,000

6(Base Project Allocation - $5,000,000)

 

7(Design & Contingencies - $5,826,000)

 

8(8) SR 0309, Safety Improvement, Various
9Intersections along SR 0309, Richland
10Township, Quakertown Borough, Project
11ID 57635

 

12Project Allocation

4,900,000

13(Base Project Allocation - $4,900,000)

 

14(9) T-563, Newtown Yardley Road,
15Intersection Improvement, Newtown
16Yardley Road Corridor and Various
17Intersections, Newtown Township,
18Project ID 57639

 

19Project Allocation

1,100,000

20(Base Project Allocation - $1,100,000)

 

21(10) SR 0032, Highway Restoration, (SR
220032) River Road, 200 Feet North of
23Paxson Road to 1,100 Feet South of
24Paxson Road, Solebury Township,
25Project ID 87744

 

26Project Allocation

745,000

27(Base Project Allocation - $745,000)

 

28(11) SR 0013, Highway Portion Bridge
29Rehabilitation, Various Locations,
30Various Municipalities in Bucks,

 

1Delaware and Montgomery Counties,
2Project ID 92184

 

3Project Allocation

1,624,000

4(Base Project Allocation - $1,624,000)

 

5(12) SR 0001, Highway Reconstruction,
6Route 1, Old Lincoln Highway to
7Turnpike Exchange, Bensalem and Falls
8Townships, Tullytown Borough, Project
9ID 93444

 

10Project Allocation

16,000,000

11(Base Project Allocation -
12$16,000,000)

 

13(13) SR 0132, Resurface, Street Road from
14Davisville Road to Bustletown Pike (SR
150532), Warminster and Southampton
16Townships, Project ID 102374

 

17Project Allocation

2,620,000

18(Base Project Allocation - $2,600,000)

 

19(Design & Contingencies - $20,000)

 

20(14) SR 0611, Resurface, Along PA 611
21(Easton Road) and SR 1001 (Main
22Street), Doylestown Borough, Project
23ID 102375

 

24Project Allocation

4,520,000

25(Base Project Allocation - $4,500,000)

 

26(Design & Contingencies - $20,000)

 

27(15) I-95, Reconstruction, I-95 from the
28Philadelphia City Line to the New
29Jersey State Line, Various
30Municipalities, Project ID 0

 

1Project Allocation

71,600,000

2(Base Project Allocation -
3$71,600,000)

 

4(16) SR 0352, Intersection Improvements,
5Holland Road at Buck Road and Route
6352, Newtown Township, Project ID
7102272

 

8Project Allocation

13,675,000

9(Base Project Allocation -
10$10,729,000)

 

11(Land Allocation - $1,008,000)

 

12(Design & Contingencies - $1,938,000)

 

13(17) SR 0232, Resurface, Windy Bush Road
14(SR 0232) from Durham Road (SR 0413)
15to River Road (SR 0032), New Hope
16Borough, Wrightstown, Upper Makefield
17and Solebury Townships, Project ID
18102373

 

19Project Allocation

1,770,000

20(Base Project Allocation - $1,750,000)

 

21(Design & Contingencies - $20,000)

 

22(18) Various, Highway Portion Bridge
23Replacement, Various State Routes,
24Various Municipalities, Project ID
2592310

 

26Project Allocation

4,218,000

27(Base Project Allocation - $3,615,000)

 

28(Design & Contingencies - $603,000)

 

29Section 310. Butler County.

30Projects are as follows:

 

1(1) (Reserved).

 

2(2) SR 0008, Resurface, Address ADA Curb
3Ramps and Crosswalks, along SR 0008
4from the 422 Interchange to SR 0356
5(Wayne Street), City of Butler, Butler
6Township, Project ID 91284

 

7Project Allocation

480,000

8(Base Project Allocation - $480,000)

 

9(3) SR 0422, Highway Portion Bridge
10Replacement, Existing Structure
11carrying US 422 over PA 356, Butler
12Township, Project ID 24663

 

13Project Allocation

628,000

14(Base Project Allocation - $534,000)

 

15(Land Allocation - $19,000)

 

16(Design & Contingencies - $75,000)

 

17(4) SR 0268, Highway Reconstruction, SR
180268, Allegheny, Donegal, Fairview and
19Parker Townships and Bruin, Karns City
20and Petrolia Boroughs, Project ID
2191824

 

22Project Allocation

1,000,000

23(Base Project Allocation - $1,000,000)

 

24(5) SR 0422, Widening, Left Turn Lane,
25Along US 422 from SR 1025 (Bonniebrook
26Road) to T-623 (Carbon Center Road),
27Summit Township, Project ID 98098

 

28Project Allocation

5,301,000

29(Base Project Allocation - $4,300,000)

 

30(Land Allocation - $401,000)

 

1(Design & Contingencies - $600,000)

 

2(6) SR 0019, Resurface, along US 19 from
3SR 3025 (Little Creek Road) to SR
40488, Jackson, Lancaster and Muddy
5Creek Townships, Portersville Borough,
6Project ID 91290

 

7Project Allocation

348,000

8(Base Project Allocation - $348,000)

 

9(7) SR 0228, Highway Restoration, along
10PA 228 from its Intersection with SR
112005 (Saxonburg Road) to its
12Intersection with SR 0356 (North
13Pike/South Pike Road), Buffalo and
14Clinton Townships, Project ID 97207

 

15Project Allocation

3,000,000

16(Base Project Allocation - $3,000,000)

 

17(8) SR 0228, Intersection Improvement,
18Existing Intersection of SR 0028 and
19SR 2005 (Saxonburg Boulevard), Clinton
20Township, Project ID 90309

 

21Project Allocation

5,530,000

22(Base Project Allocation - $4,200,000)

 

23(Land Allocation - $970,000)

 

24(Design & Contingencies - $360,000)

 

25(9) SR 0308, Highway Reconstruction, SR
260308, Center, Cherry, Clay, Marion and
27Venango Townships, Project ID 91822

 

28Project Allocation

1,800,000

29(Base Project Allocation - $1,800,000)

 

30(10) SR 0019, Variable Message Signs,

 

1along US 19 from the Allegheny County
2Line North to the Lawrence County
3Line, Cranberry, Jackson, Lancaster
4and Muddy Creek Townships,
5Portersville and Zelienople Boroughs,
6Project ID 98084

 

7Project Allocation

2,400,000

8(Base Project Allocation - $2,250,000)

 

9(Design & Contingencies - $150,000)

 

10(11) SR 0138, Highway Portion Bridge
11Replacement, Existing Structure
12Carrying SR 0138 (West Sunberry Road)
13over the Bessemer and Lake Erie
14Railroad, Clay Township, Project ID
1595867

 

16Project Allocation

232,000

17(Base Project Allocation - $232,000)

 

18(12) SR 0228, Safety Improvement,
19Intersection of PA 228 (Mars Crider
20Road) and SR 3019 (Pittsburgh
21Street/Warrendale Road), Adams
22Township, Project ID 91285

 

23Project Allocation

3,947,000

24(Base Project Allocation - $1,291,000)

 

25(Land Allocation - $1,701,000)

 

26(Design & Contingencies - $955,000)

 

27(13) SR 0228, Resurface, Safety
28Improvement, Intersection of PA 228
29(Mars Crider Road) and SR 3007 (Three
30Degree Road), Adams Township, Project

 

1ID 91286

 

2Project Allocation

13,703,000

3(Base Project Allocation -
4$10,501,000)

 

5(Land Allocation - $2,251,000)

 

6(Design & Contingencies - $951,000)

 

7(14) SR 0356, Resurface, along SR 0356
8(Wayne Street) from T-583 (Riemer
9Road) to T-850 (Newport Road),
10Buffalo, Jefferson and Winfield
11Township, Project ID 91287

 

12Project Allocation

710,000

13(Base Project Allocation - $710,000)

 

14(15) SR 0019, Safety Improvement, along
15SR 0019 at SR 0068 West (Beaver
16Street), SR 0288 (New Castle Street)
17and SR 0068 (East Grandview Avenue),
18Zelienople Borough, Project ID 90310

 

19Project Allocation

1,500,000

20(Base Project Allocation - $1,500,000)

 

21(16) SR 0008, Resurface, along PA 8 from
22SR 0308 to SR 0058, Brady, Center and
23Clay Townships, Harrisville Borough,
24Mercer and Slippery Rock Townships,
25Project ID 91289

 

26Project Allocation

732,000

27(Base Project Allocation - $732,000)

 

28(17) SR 0079, Preventive Maintenance,
29along I-79 from the Jackson Township
30Line North to SR 0488, Jackson,

 

1Lancaster and Muddy Creek Townships,
2Project ID 91919

 

3Project Allocation

2,582,000

4(Base Project Allocation - $2,501,000)

 

5(Design & Contingencies - $81,000)

 

6(18) SR 0058, Resurface, along PA 58 from
7SR 0008 to SR 0038, Eau Claire
8Borough, Marion, Mercer and Venango
9Townships, Project ID 91291

 

10Project Allocation

396,000

11(Base Project Allocation - $396,000)

 

12(19) SR 0038, Resurface, along SR 0038
13from SR 0068 North to SR 1002,
14Allegheny and Center Townships, Cherry
15Valley Borough, Concord Township, Eau
16Claire Borough, Oakland, Summit,
17Venango and Washington Townships,
18Project ID 91292

 

19Project Allocation

1,000,000

20(Base Project Allocation - $1,000,000)

 

21(20) SR 0488, Highway Reconstruction, SR
220488 from the Lawrence County Line to
23SR 0422, Franklin and Muddy Creek
24Townships, Portersville and Prospect
25Boroughs, Project ID 91293

 

26Project Allocation

350,000

27(Base Project Allocation - $350,000)

 

28(21) SR 2007, Resurface, along SR 2007
29from SR 1013 in Allegheny County to SR
300228 and SR 2012 to SR 2005, Clinton

 

1and Jefferson Townships and Saxonburg
2Borough, Project ID 91297

 

3Project Allocation

1,000,000

4(Base Project Allocation - $1,000,000)

 

5(22) SR 0019, Highway Reconstruction, SR
60019, Cranberry, Jackson, Lancaster
7and Muddy Creek Townships and
8Portersville and Zelienople Boroughs,
9Project ID 91816

 

10Project Allocation

2,200,000

11(Base Project Allocation - $2,200,000)

 

12(23) SR 0228, Highway Reconstruction,
13along PA 228 (Mars Crider Road) from
14Approximately 0.59 Mile East of SR
153015 (Mars Valencia Road to 0.07 Mile
16West of PA 8, Adams and Middlesex
17Townships, Project ID 91288

 

18Project Allocation

15,315,000

19(Base Project Allocation -
20$13,541,000)

 

21(Land Allocation - $1,390,000)

 

22(Design & Contingencies - $384,000)

 

23(24) SR 0019, Intersection Improvement,
24Existing Intersection of US 19 and PA
2568, Zelienople Borough, Project ID
2698083

 

27Project Allocation

1,901,000

28(Base Project Allocation - $1,101,000)

 

29(Land Allocation - $500,000)

 

30(Design & Contingencies - $300,000)

 

1(25) SR 3015, Highway Portion Bridge
2Replacement, SR 3015 (Mars Evans City
3Road/Washington Street) over a
4Tributary of Breakneck Creek, Forward
5Township, Project ID 96687

 

6Project Allocation

4,058,000

7(Base Project Allocation - $3,001,000)

 

8(Land Allocation - $176,000)

 

9(Design & Contingencies - $881,000)

 

10(26) T-810, Highway Reconstruction, T-810
11Bonniebrook Road, Summit Township,
12Project ID 91783

 

13Project Allocation

750,000

14(Base Project Allocation - $750,000)

 

15(27) SR 0008, Intersection Improvement,
16Existing Intersection of PA 8 and SR
173001 (Hansen Avenue), Butler Township,
18Project ID 98080

 

19Project Allocation

1,571,000

20(Base Project Allocation - $1,320,000)

 

21(Land Allocation - $51,000)

 

22(Design & Contingencies - $200,000)

 

23(28) SR 0422, Highway Reconstruction, SR
240422 Corridor, Butler, Clearfield,
25Connoquenessing, Franklin, Muddy Creek
26and Summit Townships, Prospect
27Borough, Project ID 91853

 

28Project Allocation

2,800,000

29(Base Project Allocation - $2,800,000)

 

30(29) SR 0356, Highway Reconstruction, SR

 

10356, Butler, Buffalo, Jefferson,
2Summit and Winfield Townships and City
3of Butler, Project ID 91851

 

4Project Allocation

1,910,000

5(Base Project Allocation - $1,910,000)

 

6(30) SR 0356, Resurface, along PA 356
7from T-579 (Rennick Road) to its
8Intersection with SR 2014 (McQuiston
9Road), Butler, Jefferson and Summit
10Townships, Project ID 98029

 

11Project Allocation

1,800,000

12(Base Project Allocation - $1,800,000)

 

13(31) SR 0422, Milling and Resurfacing,
14along US 422 Eastbound and Westbound
15from just West of the I-79 Interchange
16to just East of the PA 528
17Interchange, Franklin and Muddy Creek
18Townships, Prospect Borough, Project
19ID 88984

 

20Project Allocation

1,757,000

21(Base Project Allocation - $1,750,000)

 

22(Design & Contingencies - $7,000)

 

23(32) SR 0019, Intersection Improvements,
24Intersection of US 19, SR 3020
25(Freedom Road) and PA 228, Cranberry
26Township, Project ID 88991

 

27Project Allocation

1,073,000

28(Base Project Allocation - $798,000)

 

29(Land Allocation - $184,000)

 

30(Design & Contingencies - $91,000)

 

1(33) SR 0422, Highway Portion Bridge
2Preservation Activities, US 422 over
3the Buffalo and Pittsburgh Railroad
4and Bonnie Brook, Butler, Jackson and
5Summit Townships, Zelienople Borough,
6Project ID 98023

 

7Project Allocation

1,140,000

8(Base Project Allocation - $1,140,000)

 

9(34) SR 0108, Highway Reconstruction, SR
100108, Slippery Rock and Worth
11Townships and Slippery Rock Borough,
12Project ID 91872

 

13Project Allocation

790,000

14(Base Project Allocation - $790,000)

 

15(35) SR 3017, Highway Reconstruction, SR
163017, Adams Township, Project ID 91834

 

17Project Allocation

800,000

18(Base Project Allocation - $800,000)

 

19(36) SR 3015, Highway Reconstruction, SR
203015, Adams and Forward Townships and
21Callery, Evans City and Mars Boroughs,
22Project ID 91836

 

23Project Allocation

640,000

24(Base Project Allocation - $640,000)

 

25(37) SR 0528, Highway Reconstruction, SR
260528 from SR 0422 to SR 0008, Brady
27and Franklin Townships, Prospect
28Borough, Project ID 91304

 

29Project Allocation

1,000,000

30(Base Project Allocation - $1,000,000)

 

1(38) SR 0138, Highway Reconstruction, SR
20138, Clay, Concord and Washington
3Townships, West Sunbury Borough,
4Project ID 91826

 

5Project Allocation

800,000

6(Base Project Allocation - $800,000)

 

7(39) SR 3018, Highway Reconstruction, SR
83018, Cranberry Township, Project ID
991832

 

10Project Allocation

475,000

11(Base Project Allocation - $475,000)

 

12(40) SR 0028, Highway Reconstruction, SR
130028, Buffalo Township, Project ID
1491847

 

15Project Allocation

305,000

16(Base Project Allocation - $305,000)

 

17(41) SR 3007, Resurface, along SR 3007
18(Valencia Road) SR 4031 (Babcock
19Boulevard) to SR 3017 (Union Church
20Road), Adams Township, Valencia
21Borough, Project ID 91838

 

22Project Allocation

300,000

23(Base Project Allocation - $300,000)

 

24(42) I-79, Highway Reconstruction, I-79
25from SR 0488 North to the Lawrence
26County Line, Muddy Creek and Worth
27Townships, Project ID 91918

 

28Project Allocation

2,080,000

29(Base Project Allocation - $2,000,000)

 

30(Design & Contingencies - $80,000)

 

1(43) SR 0079, Preventive Maintenance,
2along I-79 from the Allegheny County
3Line North to the Lancaster Township
4Line, Cranberry, Jackson and Lancaster
5Townships, Project ID 91920

 

6Project Allocation

2,582,000

7(Base Project Allocation - $2,501,000)

 

8(Design & Contingencies - $81,000)

 

9(44) SR 0173, Highway Reconstruction, SR
100173, Brady, Mercer and Slippery Rock
11Townships, Slippery Rock Borough,
12Project ID 91877

 

13Project Allocation

800,000

14(Base Project Allocation - $800,000)

 

15(45) SR 3021, Highway Reconstruction, SR
163021, Cranberry and Jackson Townships,
17Evans City Borough, Project ID 91830

 

18Project Allocation

600,000

19(Base Project Allocation - $600,000)

 

20(46) SR 3022, Resurface, along SR 3022
21(Rochester Road) from the Beaver
22County Line to US 19, Cranberry
23Township, Project ID 91828

 

24Project Allocation

900,000

25(Base Project Allocation - $900,000)

 

26(47) SR 0258, Resurface, along PA 258
27from PA 108 to the Mercer County Line,
28Slippery Rock Borough and Slippery
29Rock Township, Project ID 34914

 

30Project Allocation

210,000

1(Base Project Allocation - $210,000)

 

2(48) SR 3025, Roadway Safety
3Improvements, SR 3025 (Little Creek
4Road) from the Intersection with US
519, Jackson Township, Project ID 94601

 

6Project Allocation

4,342,000

7(Base Project Allocation - $3,501,000)

 

8(Land Allocation - $451,000)

 

9(Design & Contingencies - $390,000)

 

10(49) SR 3020, Highway Reconstruction, SR
113020, Cranberry Township, Project ID
1291827

 

13Project Allocation

950,000

14(Base Project Allocation - $950,000)

 

15(50) SR 0038, Highway Reconstruction, SR
160038, Allegheny, Center, Concord,
17Oakland, Summit, Venango and
18Washington Townships, Cherry Valley
19and Eau Claire Boroughs, Project ID
2091875

 

21Project Allocation

2,600,000

22(Base Project Allocation - $2,600,000)

 

23(51) SR 4002, Highway Portion Bridge
24Replacement, Existing Structure
25carrying SR 4002 (Mahood Road) over
26the Bessemer and Lake Erie Railroad,
27Clay Township, Project ID 89967

 

28Project Allocation

236,000

29(Base Project Allocation - $183,000)

 

30(Design & Contingencies - $53,000)

 

1(52) SR 0228, Highway Reconstruction, SR
20228, Adams, Buffalo, Clinton,
3Cranberry and Middlesex Townships,
4Seven Fields Borough, Project ID 91814

 

5Project Allocation

1,943,000

6(Base Project Allocation - $1,943,000)

 

7(53) SR 2012, Resurface, along SR 2012
8(Dinnerbell Road) from PA 8 to SR 2007
9(Main Street, Jefferson and Penn
10Townships, Project ID 91294

 

11Project Allocation

1,000,000

12(Base Project Allocation - $1,000,000)

 

13(54) I-79, Highway Reconstruction, I-79
14from SR 3025 near Harmony Borough,
15North to PA 488, Jackson, Lancaster
16and Muddy Creek Townships, Project ID
1787716

 

18Project Allocation

2,372,000

19(Base Project Allocation - $2,357,000)

 

20(Design & Contingencies - $15,000)

 

21(55) SR 0228, Widening to 4/5 Lanes,
22along PA 228 from the SR 3015 (Mars-
23Valencia Road) West to SR 3021
24(Franklin Road), Adams and Cranberry
25Townships, Seven Fields Borough,
26Project ID 92908

 

27Project Allocation

73,250,000

28(Base Project Allocation -
29$44,000,000)

 

30(Land Allocation - $27,450,000)

 

1(Design & Contingencies - $1,800,000)

 

2(56) SR 0008, Highway Reconstruction, SR
30008 Corridor, Butler, Brady, Center,
4Clay, Mercer, Middlesex, Penn and
5Slippery Rock Townships, City of
6Butler, Harrisville Borough, Project
7ID 91850

 

8Project Allocation

3,802,000

9(Base Project Allocation - $3,802,000)

 

10(57) I-79, Highway Reconstruction with
11Bridge Preservation, I-79, Cranberry
12and Jackson Townships, Project ID
1387718

 

14Project Allocation

2,100,000

15(Base Project Allocation - $2,020,000)

 

16(Design & Contingencies - $80,000)

 

17(58) I-79, Highway Reconstruction, I-79
18from SR 0488 North to the Lawrence
19County Line, Muddy Creek and Worth
20Townships, Project ID 87719

 

21Project Allocation

2,000,000

22(Base Project Allocation - $1,985,000)

 

23(Design & Contingencies - $15,000)

 

24(59) I-79, Reconstruction, I-79 from the
25Allegheny County Line to the Lawrence
26County Line, Various Municipalities,
27Project ID 0

 

28Project Allocation

109,600,000

29(Base Project Allocation -
30$109,600,000)

 

1(60) SR 0422, Resurface, along US 422
2from 0.42 Mile Northeast of SR 0528
3(Franklin Street) to 0.03 Mile
4Southeast of T-479 (Whipporwill Road),
5Connoquenessing and Franklin
6Townships, Prospect Borough, Project
7ID 100286

 

8Project Allocation

3,300,000

9(Base Project Allocation - $3,300,000)

 

10(61) I-80, Reconstruction, I-80 from the
11Venango County Line to the Clarion
12County Line, Various Municipalities,
13Project ID 0

 

14Project Allocation

7,400,000

15(Base Project Allocation - $7,400,000)

 

16(62) SR 0068, Resurface, along PA 68 from
170.5 Mile North of the SR 0422/0068
18Interchange to its Intersection with
19T-840 (Oakland Drive), Oakland and
20Summit Townships, Project ID 98108

 

21Project Allocation

1,500,000

22(Base Project Allocation - $1,500,000)

 

23Section 311. Cambria County.

24Projects are as follows:

 

25(1) SR 0164, Resurface, on PA 164 from
26Dulancey Drive (SR 2012) to North
27Railroad Avenue Intersection, Portage
28Borough, Project ID 91642

 

29Project Allocation

300,000

30(Base Project Allocation - $300,000)

 

1(2) SR 1011, Resurface, Lincoln Road (SR
21011) from SR 1006 to Columbia Street
3(SR 1001), Allegheny Township, Chest
4Springs Borough, Project ID 96496

 

5Project Allocation

2,000,000

6(Base Project Allocation - $2,000,000)

 

7(3) SR 3016, Corridor Safety
8Improvements, Luther Road (SR 3010)
9from PA 56 (Scalp Avenue) to PA 756
10(Eltroad), Richland Township, Project
11ID 88244

 

12Project Allocation

200,000

13(Base Project Allocation - $200,000)

 

14(4) SR 3041, Resurface, on SR 3041 from
15PA 403 to US 22, Jackson and West
16Taylor Townships, Project ID 91645

 

17Project Allocation

460,000

18(Base Project Allocation - $460,000)

 

19(5) SR 1023, Resurface, Saint Augustine
20Road (SR 1023) from PA 36 to PA 53,
21Clearfield, Reade and White Townships,
22Project ID 96498

 

23Project Allocation

3,100,000

24(Base Project Allocation - $3,100,000)

 

25(6) SR 4013, Construct Center Turn Lane,
26Add Lane, PA 271 from Courter Avenue
27(T-761) to Polaris Drive, Jackson
28Township, Project ID 88247

 

29Project Allocation

200,000

30(Base Project Allocation - $200,000)

 

1(7) SR 0164, Resurface, on PA 164 from US
222 to PA 53, Munster and Portage
3Townships, Project ID 91644

 

4Project Allocation

400,000

5(Base Project Allocation - $400,000)

 

6(8) Industrial Park Road, Roadway
7Widening, on Industrial Park Road (T-
8737) from Allenbill Drive (T-531) to
9CTC Drive, Richland Township, Project
10ID 95666

 

11Project Allocation

96,000

12(Base Project Allocation - $96,000)

 

13(9) SR 0219, Resurfacing and Drainage
14Improvements, on US 219 from the 10th
15Street to PA 271 and from Philadelphia
16Avenue (SR 4016) to Susquehanna
17Township Line, East Carroll and
18Jackson Townships, Northern Cambria
19Borough, Project ID 72241

 

20Project Allocation

717,000

21(Base Project Allocation - $466,000)

 

22(Design & Contingencies - $251,000)

 

23(10) SR 3037, PA 403, SR 3025, SR 3044,
24PA 756, Highway Reconstruction, PA
25403, SR 3025, SR 3044 in Johnstown, PA
26756 in Richland and SR 3037 in East
27Taylor Township, City of Johnstown,
28East Taylor Township, Project ID 88742

 

29Project Allocation

400,000

30(Base Project Allocation - $400,000)

 

1(11) SR 1006, Resurface, on Syberton Road
2(SR 1006) from Saint Mary Street (SR
31005) to PA 53, Allegheny and
4Gallitzin Townships, Loretto Borough,
5Project ID 96495

 

6Project Allocation

1,100,000

7(Base Project Allocation - $1,100,000)

 

8(12) SR 1003, Resurface, Munster Road (SR
91003) from US 22 to Admiral Peary
10Highway (SR 2014), Munster Township,
11Project ID 96494

 

12Project Allocation

100,000

13(Base Project Allocation - $100,000)

 

14(13) SR 0271, Highway Portion Bridge
15Replacement, PA 271 over Browns Run
16near the Intersection of Yasick Road
17(T-522), Barr Township, Project ID
1894469

 

19Project Allocation

167,000

20(Base Project Allocation - $155,000)

 

21(Land Allocation - $12,000)

 

22(14) SR 0756, Intersection Improvements,
23US 22 at the Intersection of Wilmore
24Road (SR 2013), Cambria Township,
25Project ID 88246

 

26Project Allocation

200,000

27(Base Project Allocation - $200,000)

 

28(15) SR 3016, Highway Restoration, SR
293016 (Bedford Street) from Lulay
30Street to Demuth Street, Geistown

 

1Borough, Project ID 94476

 

2Project Allocation

1,012,000

3(Base Project Allocation - $701,000)

 

4(Land Allocation - $150,000)

 

5(Design & Contingencies - $161,000)

 

6(16) SR 4004, Highway Portion Bridge
7Replacement, SR 4004 (Number Six Road)
8over West Branch of Susquehanna River,
9West Carroll Township, Project ID
1094479

 

11Project Allocation

145,000

12(Base Project Allocation - $140,000)

 

13(Land Allocation - $5,000)

 

14(17) SR 0219, Highway Reconstruction, on
15US 219 from US 422 Interchange to End
16of Concrete Section, Cambria and East
17Carroll Townships, Project ID 82714

 

18Project Allocation

800,000

19(Base Project Allocation - $800,000)

 

20(18) SR 4017, Highway Portion Bridge
21Replacement, SR 4017 (Highland Avenue)
22over Chest Creek, Elder Township,
23Patton Borough, Project ID 94491

 

24Project Allocation

219,000

25(Base Project Allocation - $186,000)

 

26(Land Allocation - $4,000)

 

27(Design & Contingencies - $29,000)

 

28(19) SR 0219, Mill and Overlay, on US 219
29from Somerset County Line to Galleria
30Interchange, Richland Township,

 

1Project ID 88598

 

2Project Allocation

2,603,000

3(Base Project Allocation - $2,515,000)

 

4(Design & Contingencies - $88,000)

 

5(20) SR 4002, Highway Reconstruction, SR
64002 Snake Road from Priesser Road T-
7490 to SR 4005 Colver Road, Barr and
8Cambria Townships, Project ID 91648

 

9Project Allocation

300,000

10(Base Project Allocation - $300,000)

 

11(21) SR 3006, Resurface, on Eisenhower
12Boulevard (SR 3006) from PA 403 to PA
1356, Richland and Stoneycreek
14Townships, Project ID 91647

 

15Project Allocation

4,000,000

16(Base Project Allocation - $4,000,000)

 

17(22) SR 3033, Highway Reconstruction, SR
183033 Soloman Run Road from Walters
19Avenue T-339 to SR 3024 Ragers Hill
20Road, Richland Township, Project ID
2191632

 

22Project Allocation

400,000

23(Base Project Allocation - $400,000)

 

24(23) SR 3034, Highway Reconstruction, SR
253034 Beulah Road from SR 3049 Cardiff
26Road to US 219 Overpass, Blacklick and
27Cambria Townships, Nanty Glo Borough,
28Project ID 91649

 

29Project Allocation

460,000

30(Base Project Allocation - $460,000)

 

1(24) SR 3031, Resurface, on SR 3031 from
2Galleria Drive (T-735) to Frankstown
3Road (SR 3024), Conemaugh and Richland
4Townships, Project ID 91631

 

5Project Allocation

575,000

6(Base Project Allocation - $575,000)

 

7(25) SR 0056, Resurface, PA 56 from
8Widman Street to Walters Avenue, City
9of Johnstown, Richland and Stonycreek
10Townships, Project ID 96482

 

11Project Allocation

1,700,000

12(Base Project Allocation - $1,700,000)

 

13(26) SR 0160, Resurface, PA 160 from
14Gates Hill Road (SR 2011) to SR 2013,
15Cambria and Summerhill Townships,
16Project ID 96485

 

17Project Allocation

700,000

18(Base Project Allocation - $700,000)

 

19(27) SR 0160, Resurface, PA 164 from SR
202013 to High Street (SR 4031), Cambria
21Township, Project ID 96486

 

22Project Allocation

1,900,000

23(Base Project Allocation - $1,900,000)

 

24(28) SR 3030, Resurface, SR 3030 (Mineral
25Point Road) from PA 271 to Saltlick
26Road, East Taylor Township, Project ID
2796339

 

28Project Allocation

520,000

29(Base Project Allocation - $520,000)

 

30(29) SR 0219, Concrete Rehabilitation, on

 

1US 219 from Lehmier Street to Sunset
2Road (SR 4013), Carrolltown Borough,
3Project ID 96488

 

4Project Allocation

181,000

5(Base Project Allocation - $181,000)

 

6(30) SR 1019, Resurface, SR 1019 (Loop
7Road/Beaver Valley Road) from SR 1012
8(School House Drive) to SR 1025
9(Glendale Lake Road), Clearfield
10Township, Project ID 96338

 

11Project Allocation

1,174,000

12(Base Project Allocation - $1,174,000)

 

13(31) SR 0219, Resurface, on US 219 from
14Moss Creek Road (SR 4029) to the
15Indiana County Line, Susquehanna
16Township, Project ID 96489

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(32) SR 0253, Resurface, on PA 253 from
20PA 865 to Roseland Road (SR 1022),
21Reade Township, Project ID 96490

 

22Project Allocation

200,000

23(Base Project Allocation - $200,000)

 

24(33) SR 0865, Resurface, on PA 865 from
25Roseland Road (SR 1022) to the
26Clearfield County Line, Reade
27Township, Project ID 96491

 

28Project Allocation

1,000,000

29(Base Project Allocation - $1,000,000)

 

30(34) SR 0869, Resurface, on PA 869 from

 

1US 219 to PA 160, Adams Township,
2Project ID 96492

 

3Project Allocation

1,000,000

4(Base Project Allocation - $1,000,000)

 

5(35) SR 1001, Resurface, SR 1001 – Rowena
6Drive to Winterset Road, Cambria
7Township, Ebensburg Borough, Project
8ID 96493

 

9Project Allocation

850,000

10(Base Project Allocation - $850,000)

 

11(36) SR 2006, Resurface, Frankstown Road
12(SR 2006) from Ragers Hill Road (SR
133024) to Washington Avenue (SR 2007),
14Croyle and Summerhill Townships,
15Project ID 96501

 

16Project Allocation

2,055,000

17(Base Project Allocation - $2,055,000)

 

18(37) SR 3005, Highway Reconstruction, SR
193005 Saint Clair Road from PA 271 to
20PA 56, Lower Yoder Township, City of
21Johnstown, Westmont Borough, Project
22ID 91646

 

23Project Allocation

630,000

24(Base Project Allocation - $630,000)

 

25(38) SR 0026, Resurface, SR 3016 from
26Walters Avenue to Lamberd Avenue,
27Geistown Borough, Richland Township,
28Project ID 88249

 

29Project Allocation

200,000

30(Base Project Allocation - $200,000)

 

1(39) SR 0164, Resurface, on PA 164 from
2North Railroad Avenue to Blair county
3Line, Portage Borough, Portage
4Township, Project ID 96487

 

5Project Allocation

2,400,000

6(Base Project Allocation - $2,400,000)

 

7(40) SR 0154, Highway Restoration, PA 53
8over Bens Creek near the Intersection
9of Cassandra Road (SR 2015), Portage
10Township, Project ID 88137

 

11Project Allocation

100,000

12(Base Project Allocation - $100,000)

 

13(41) SR 0144, Corridor Safety
14Improvements, PA 756 from Bernard
15Street to Hoffman Drive (T-476),
16Geistown Borough, Richland Township,
17Project ID 88251

 

18Project Allocation

200,000

19(Base Project Allocation - $200,000)

 

20(42) SR 3024, Safety Improvement, on
21Adams Street (SR 3024) from Brewer
22Road to Mount Hope Road (T-320), Adams
23and Richland Townships, Project ID
2496506

 

25Project Allocation

1,951,000

26(Base Project Allocation - $1,601,000)

 

27(Land Allocation - $350,000)

 

28(43) SR 3026, Resurface, Main Street (SR
293026) from SR 3029 to Solomon Run Road
30(SR 3033), Conemaugh Township,

 

1Franklin Borough, Richland Township,
2Project ID 96507

 

3Project Allocation

1,500,000

4(Base Project Allocation - $1,500,000)

 

5(44) SR 4009, Resurface, on Deveaux
6Street (SR 4009) from Number 6 Road
7(SR 4004) to US 219, Barr Township,
8Northern Cambria Borough, West Carroll
9Township, Project ID 96508

 

10Project Allocation

1,400,000

11(Base Project Allocation - $1,400,000)

 

12(45) SR 4017, Resurface, on Barrens Road
13(SR 4017) from PA 36 to Clearfield
14County Line, Chest and Elder
15Townships, Patton Borough, Project ID
1696509

 

17Project Allocation

3,000,000

18(Base Project Allocation - $3,000,000)

 

19(46) SR 4018, Resurface, Greenwich Road
20(SR 4018) from Indiana County Line to
21US 219, Susquehanna Township, Project
22ID 96510

 

23Project Allocation

1,110,000

24(Base Project Allocation - $1,110,000)

 

25(47) SR 4023, Resurface, Miller Street
26(SR 4023) from Beaver Street (SR 4021)
27to PA 36, Elder Township, Hastings
28Borough, Project ID 96511

 

29Project Allocation

1,296,000

30(Base Project Allocation - $1,296,000)

 

1(48) SR 4025, Resurface, on Ridge Road
2(SR 4025) from Municipal Road (SR
34016) to Clearfield County Line,
4Susquehanna Township, Project ID 96512

 

5Project Allocation

2,350,000

6(Base Project Allocation - $2,350,000)

 

7(49) SR 3024, Resurface, SR 3024 from
8Vogel Street (T-753) to Solomon Run
9Road (SR 3033), Adams, Conemaugh and
10Richland Townships, Project ID 92753

 

11Project Allocation

400,000

12(Base Project Allocation - $400,000)

 

13(50) SR 0553, Resurface, on PA 553 from
14Indiana County Line to US 219, Barr,
15East Carroll and West Carroll
16Townships, Project ID 91641

 

17Project Allocation

630,000

18(Base Project Allocation - $630,000)

 

19(51) SR 0240, Highway Reconstruction, PA
20240 from Indiana County Line to US
21219, Susquehanna Township, Project ID
2292750

 

23Project Allocation

400,000

24(Base Project Allocation - $400,000)

 

25(52) SR 3016, Resurface, on SR 3016 from
26Demuth Street to PA 56, Geistown
27Borough, Richland Township, Project ID
2891640

 

29Project Allocation

240,000

30(Base Project Allocation - $240,000)

 

1(53) SR 3016, Resurface, on Bedford
2Street (SR 3016) from PA 56 to Horner
3Street, City of Johnstown, Project ID
491639

 

5Project Allocation

700,000

6(Base Project Allocation - $700,000)

 

7(54) SR 0056, Resurface, on PA 56 from
8Decker Avenue to Third Avenue and on
9PA 403 from Fairfield Avenue to Laurel
10Avenue, City of Johnstown, Project ID
1196930

 

12Project Allocation

209,000

13(Base Project Allocation - $209,000)

 

14(55) SR 4015, Resurface, Carroll Street
15(SR 4015) from Intersection of Carroll
16Street to Magee Avenue (SR 4008),
17Carrolltown Borough, East Carroll
18Township, Patton Borough, Project ID
1992610

 

20Project Allocation

350,000

21(Base Project Allocation - $350,000)

 

22(56) SR 1021, Resurface, SR 1021 from PA
2336 to PA 53, Chest, Clearfield, Reade
24and White Townships, Project ID 92613

 

25Project Allocation

600,000

26(Base Project Allocation - $600,000)

 

27(57) SR 3031, Highway Portion Bridge
28Preservation Activities, Galleria
29Drive (SR 3031) over US 219, Richland
30Township, Project ID 91683

 

1Project Allocation

155,000

2(Base Project Allocation - $155,000)

 

3(58) SR 0271, Highway Portion Bridge
4Replacement, PA 271 over West Branch
5of Susquehanna River, Northern Cambria
6Borough, Project ID 91675

 

7Project Allocation

200,000

8(Base Project Allocation - $200,000)

 

9(59) SR 0056, Intersection and Safety
10Improvements, along Strayer Street
11from Laurel Avenue Westward through
12Decker Avenue and "S" Curves to Brush
13Avenue, City of Johnstown, Lower Yoder
14Township, Project ID 22657

 

15Project Allocation

780,000

16(Land Allocation - $300,000)

 

17(Design & Contingencies - $480,000)

 

18(60) SR 4027, Resurface, on Main Street
19(SR 4027) from Philadelphia Avenue (US
20219) to Shawna Road (US 219), Northern
21Cambria Borough, Susquehanna Township,
22Project ID 96513

 

23Project Allocation

2,500,000

24(Base Project Allocation - $2,500,000)

 

25(61) SR 1005, Roadway Relocation, on SR
261005 from SR 2014 to Syberton Road (SR
271006), Allegheny Township, Cresson
28Borough, Cresson Township, Loretto
29Borough, Project ID 88254

 

30Project Allocation

286,000

1(Base Project Allocation - $286,000)

 

2(62) SR 3037, Resurface, on SR 3037
3(William Penn Avenue) from Walnut
4Street to PA 271, East Taylor
5Township, City of Johnstown, Project
6ID 91633

 

7Project Allocation

496,000

8(Base Project Allocation - $460,000)

 

9(Design & Contingencies - $36,000)

 

10(63) SR 1029, Resurface, on Market Street
11(SR 1029) from PA 53 to Roseland Road
12(SR 1022), Reade Township, Project ID
1396500

 

14Project Allocation

950,000

15(Base Project Allocation - $950,000)

 

16(64) SR 0164, Intersection Improvements,
17on PA 164 at the Intersection of
18Dulancy Drive (SR 2012), Portage
19Borough, Project ID 95635

 

20Project Allocation

165,000

21(Base Project Allocation - $111,000)

 

22(Land Allocation - $39,000)

 

23(Design & Contingencies - $15,000)

 

24(65) SR 2007, Resurface, Margaret Avenue
25(SR 2007) from PA 869 to Fieldstone
26Avenue (SR 2006), Summerhill Township,
27Project ID 96502

 

28Project Allocation

950,000

29(Base Project Allocation - $950,000)

 

30(66) SR 0026, Roadway Relocation and

 

1Intersection Improvement, Safety
2Improvement, US 219 from Intersection
3of Colver Road (SR 4005) continuing
4North to the Intersection of Old Brick
5Road (T-465), East Carroll Township,
6Project ID 83548

 

7Project Allocation

200,000

8(Base Project Allocation - $200,000)

 

9(67) SR 1026, Highway Reconstruction, SR
101026 from SR 1025 to PA 53,
11Clearfield, Chest, White and Reade
12Townships, Project ID 92747

 

13Project Allocation

350,000

14(Base Project Allocation - $350,000)

 

15(68) SR 0160, Intersection Realignment,
16on PA 160 at the Intersection of PA
17756 and SR 2001, Adams Township,
18Project ID 92748

 

19Project Allocation

700,000

20(Base Project Allocation - $200,000)

 

21(Land Allocation - $500,000)

 

22(69) SR 0403, Highway Reconstruction, PA
23403 from PA 56 to Laurel Avenue, City
24of Johnstown, Project ID 92749

 

25Project Allocation

250,000

26(Base Project Allocation - $250,000)

 

27(70) SR 2016, Resurface, Tunnel Hill
28Street (SR 2016) from Sugar Run Road
29(SR 4002) to Forest Street (SR 1015),
30Allegheny Township, Tunnel Hill

 

1Borough, Project ID 96504

 

2Project Allocation

258,000

3(Base Project Allocation - $258,000)

 

4(71) SR 0422, Resurface, on US 422 from
5Indiana County Line to Hudson Street
6(T-717), Blacklick and Cambria
7Townships, Project ID 91634

 

8Project Allocation

641,000

9(Base Project Allocation - $606,000)

 

10(Design & Contingencies - $35,000)

 

11(72) SR 1026, Resurface, State Park Drive
12(SR 1026) from Glendale Lake Road (SR
131025) to PA 53, Chest, Clearfield,
14Reade and White Townships, Project ID
1596499

 

16Project Allocation

2,250,000

17(Base Project Allocation - $2,250,000)

 

18(73) SR 0219, Roadway Relocation to
19Eliminate Sharp Curve and Intersection
20Improvement, on US 219 at the
21Intersection of PA 553, East Carroll
22Township, Project ID 88256

 

23Project Allocation

336,000

24(Design & Contingencies - $336,000)

 

25(74) SR 0150, Intersection Improvements
26and Roadway Realignment, Sunset Road
27(SR 4013) from US 219 (Main Street) to
28PA 36 (4th Avenue), East Carroll
29Township, Carrolltown Borough, Elder
30Township, Project ID 88257

 

1Project Allocation

200,000

2(Base Project Allocation - $200,000)

 

3(75) SR 2013, Resurface, Wilmore Road (SR
42013) from PA 160 to US 22, Cambria
5Township, Project ID 96503

 

6Project Allocation

1,500,000

7(Base Project Allocation - $1,500,000)

 

8(76) SR 0271, Resurface, PA 271 from
9Westmoreland County Line to Everhart
10Street, Conemaugh Township, City of
11Johnstown, Southmont Borough, Upper
12Yoder Township, Westmont Borough,
13Project ID 91635

 

14Project Allocation

1,119,000

15(Base Project Allocation - $1,119,000)

 

16(77) SR 0271, Highway Reconstruction, PA
17271 from SR 3007 Goucher Street to
18Everhart Street, City of Johnstown,
19Southmont and Westmont Boroughs,
20Project ID 91636

 

21Project Allocation

300,000

22(Base Project Allocation - $300,000)

 

23(78) SR 0056, Resurface, on PA 56 from
24Gregg Avenue to the Kernville Viaduct,
25City of Johnstown, Project ID 91638

 

26Project Allocation

600,000

27(Base Project Allocation - $600,000)

 

28(79) SR 0036, Highway Realignment, PA 36
29between Sunset Road (SR 4013) and
30Third Avenue (T-551), Elder Township,

 

1Project ID 98740

 

2Project Allocation

4,200,000

3(Base Project Allocation - $4,200,000)

 

4(80) SR 0036, Safety Improvements, PA 36
5from Carpinello Road (T-571) to
6Clearfield County Line, Elder
7Township, Project ID 98748

 

8Project Allocation

775,000

9(Base Project Allocation - $775,000)

 

10(81) SR 0271, Safety Improvement, PA 271,
11SR 3044, SR 3016, SR 3042, SR 3055, PA
1256 and PA 403 at Various
13Intersections, Dale Borough, City of
14Johnstown, Project ID 99291

 

15Project Allocation

456,000

16(Base Project Allocation - $456,000)

 

17(82) SR 0036, Construction of Left Turn
18Lane, PA 36 at the Intersection of
19Third Avenue (T-551), Elder Township,
20Project ID 98745

 

21Project Allocation

1,175,000

22(Base Project Allocation - $1,175,000)

 

23(83) SR 3011, Safety Improvement, SR 3011
24at the Intersections with Akers
25Street, Osborne Street and PA 403,
26City of Johnstown, Project ID 99282

 

27Project Allocation

400,000

28(Base Project Allocation - $400,000)

 

29Section 312. Cameron County.

30Projects are as follows:

 

1(1) (Reserved).

 

2(2) SR 0120, Highway Portion Bridge
3Replacement, SR 0120 over Grove Run,
4Gibson Township, Project ID 69483

 

5Project Allocation

600,000

6(Base Project Allocation - $600,000)

 

7(3) SR 0155, Highway Portion Bridge
8Preservations, SR 155, Portage and
9Shippen Township, Project ID 94961

 

10Project Allocation

884,000

11(Base Project Allocation - $812,000)

 

12(Land Allocation - $11,000)

 

13(Design & Contingencies - $61,000)

 

14(4) SR 0872, Resurface, SR 0872, Grove
15Township, Project ID 72752

 

16Project Allocation

891,000

17(Base Project Allocation - $800,000)

 

18(Land Allocation - $31,000)

 

19(Design & Contingencies - $60,000)

 

20(5) SR 0120, Highway Restoration, SR
210120, SR 0872 and SR 0049, Various
22Municipalities in Cameron and Potter
23Counties, Project ID 90256

 

24Project Allocation

1,677,000

25(Base Project Allocation - $1,677,000)

 

26(6) SR 0155, Resurface, SR 0155 Emporium
27to Potter County Line, Segments
280010/0000 to 0150/2513, Portage and
29Shippen Townships, Project ID 91970

 

30Project Allocation

601,000

1(Base Project Allocation - $401,000)

 

2(Design & Contingencies - $200,000)

 

3(7) SR 0120, Highway Restoration, SR
40120, Segments 0100/0000 to 0220/0955,
5Shippen Township, Emporium Borough,
6Project ID 88292

 

7Project Allocation

600,000

8(Base Project Allocation - $600,000)

 

9(8) SR 0872, Highway Betterment Project,
10SR 0872, Segments 0070/1559 to
110210/0000, Grove Township, Project ID
1288293

 

13Project Allocation

850,000

14(Base Project Allocation - $850,000)

 

15(9) SR 0880, Highway Restoration, SR 0046
16Segments 0150/0106 to 0200/1485,
17Shippen Township, Project ID 88295

 

18Project Allocation

300,000

19(Base Project Allocation - $300,000)

 

20(10) SR 0872, Highway Reconstruction, SR
210872 near George B. Stevenson
22Reservoir, Grove Township, Project ID
2391964

 

24Project Allocation

600,000

25(Base Project Allocation - $400,000)

 

26(Design & Contingencies - $200,000)

 

27(11) SR 0046, Highway Rehabilitation
28Associated with Bridge Replacement, SR
290046 over North Creek Northwest of
30Lockwood, Shippen Township, Project ID

 

194693

 

2Project Allocation

718,000

3(Base Project Allocation - $450,000)

 

4(Land Allocation - $43,000)

 

5(Design & Contingencies - $225,000)

 

6(12) SR 0120, Guiderail Improvements,
7Cameron County SR 0120, Potter County,
8SR 0144, SR 0872, Various
9Municipalities in Cameron and Potter
10Counties, Project ID 89249

 

11Project Allocation

500,000

12(Base Project Allocation - $500,000)

 

13(13) SR 0120, Intersection Improvements,
14SR 0120/0555 Intersection, Driftwood
15Borough, Project ID 96066

 

16Project Allocation

563,000

17(Base Project Allocation - $401,000)

 

18(Land Allocation - $41,000)

 

19(Design & Contingencies - $121,000)

 

20(14) SR 4004, Highway Portion Bridge
21Replacement, SR 4004 over Driftwood
22Branch, Segment 0200/1791, Village of
23Lockwood, Shippen Township, Project ID
2491177

 

25Project Allocation

200,000

26(Base Project Allocation - $200,000)

 

27(15) SR 0120, Highway Resurfacing, SR
280120, Segments 0620/0000 to
290750/3751, Driftwood Borough, Gibson
30and Grove Townships, Project ID 93334

 

1Project Allocation

1,160,000

2(Base Project Allocation - $1,020,000)

 

3(Land Allocation - $50,000)

 

4(Design & Contingencies - $90,000)

 

5(16) SR 0555, Highway Restoration,
6Various Segments – Cameron County SR
70555, SR 2006, Elk County SR 2003, SR
82004, SR 2012, SR 2219, SR 4009,
9Various Municipalities in Cameron and
10Elk Counties, Project ID 91086

 

11Project Allocation

4,782,000

12(Base Project Allocation - $4,782,000)

 

13(17) SR 0120, Rehabilitation, Resurface,
14SR 0555 and SR 0120, Driftwood to
15Sterling Run, Driftwood Borough,
16Gibson Township, Project ID 96369

 

17Project Allocation

1,405,000

18(Base Project Allocation - $1,002,000)

 

19(Land Allocation - $60,000)

 

20(Design & Contingencies - $343,000)

 

21(18) SR 0155, Highway Restoration,
22Various Segments – Cameron County SR
230155, SR 2006, SR 1001 Elk County, SR
240255, SR 0948, SR 2003, SR 2004, SR
253002, SR 0219, SR 1001 and SR 1003,
26Various Municipalities in Cameron and
27Elk Counties, Project ID 91081

 

28Project Allocation

5,528,000

29(Base Project Allocation - $5,528,000)

 

30(19) SR 0155, Highway Resurfacing, SR 155

 

1from Emporium to Potter County Line,
2Portage and Shippen Townships, Project
3ID 96368

 

4Project Allocation

12,680,000

5(Base Project Allocation -
6$11,756,000)

 

7(Land Allocation - $168,000)

 

8(Design & Contingencies - $756,000)

 

9(20) SR 0120, Resurface, SR 0120 – Elk
10County Line to Emporium, Segments
110010/0000 to 0270/0000, Emporium
12Borough, Shippen Township, Project ID
1393363

 

14Project Allocation

1,891,000

15(Base Project Allocation - $1,760,000)

 

16(Land Allocation - $50,000)

 

17(Design & Contingencies - $81,000)

 

18(21) SR 0120, Resurface, SR 0120 from SR
190155 to Britton Hill Road, Segments
200270/000 to 0300/0000, Portage
21Township, Shippen Township, Project ID
22100480

 

23Project Allocation

515,000

24(Base Project Allocation - $515,000)

 

25(22) SR 2001, Betterment (Restoration),
26SR 2000 Quad Routes, Gibson and Grove
27Townships, Project ID 101952

 

28Project Allocation

5,111,000

29(Base Project Allocation - $4,961,000)

 

30(Design & Contingencies - $150,000)

 

1(23) SR 1001, Betterment (Restoration),
2SR 1000 Quad Routes, Emporium Borough,
3Project ID 101951

 

4Project Allocation

396,000

5(Base Project Allocation - $245,000)

 

6(Design & Contingencies - $151,000)

 

7(24) SR 0046, Betterment (Restoration),
8PA 0046, Emporium Borough, Shippen
9Township, Project ID 101639

 

10Project Allocation

3,477,000

11(Base Project Allocation - $3,326,000)

 

12(Design & Contingencies - $151,000)

 

13(25) SR 0120, Resurface, PA 120 from
14Britton Hill Road to Square Timber
15Run, Segments 0300/0000 to 0420/0000,
16Lumber and Portage Townships, Project
17ID 100497

 

18Project Allocation

2,232,000

19(Base Project Allocation - $2,232,000)

 

20(26) SR 0120, Resurface, PA 0120 from
21Stillhouse Run Road to Tributary of
22Sinnemahoning Creek, Segments
230420/0000 to 0510/0000, Gibson and
24Lumber Townships, Project ID 100500

 

25Project Allocation

1,749,000

26(Base Project Allocation - $1,749,000)

 

27(27) SR 3001, Betterment (Restoration),
28SR 3000 Quad Routes, Emporium Borough,
29Lumber and Shippen Townships, Project
30ID 101953

 

1Project Allocation

5,531,000

2(Base Project Allocation - $5,380,000)

 

3(Design & Contingencies - $151,000)

 

4(28) SR 4001, Betterment (Restoration),
5SR 4000 Quad Routes, Shippen Township,
6Project ID 101954

 

7Project Allocation

6,101,000

8(Base Project Allocation - $5,951,000)

 

9(Design & Contingencies - $150,000)

 

10(29) PA 120, Resurface, PA 120 from
11Tributary of Sinnemahoning Creek to
12Driftwood Borough, Segments 0510/0000
13to 0590/0000, Gibson Township,
14Driftwood Borough, Project ID 100503

 

15Project Allocation

1,164,000

16(Base Project Allocation - $1,164,000)

 

17(30) SR 0120, Resurface, PA 120 in
18Driftwood Borough, Segments 0590/0000
19to 0620/0000, Driftwood Borough,
20Project ID 100506

 

21Project Allocation

859,000

22(Base Project Allocation - $859,000)

 

23(31) Various, Highway Portion Bridge
24Preservation, Various State Routes,
25Various Municipalities in Elk and
26Cameron Counties, Project ID 69371

 

27Project Allocation

714,000

28(Base Project Allocation - $714,000)

 

29Section 313. Carbon County.

30Projects are as follows:

 

1(1) (Reserved).

 

2(2) SR 0940, Highway Resurface, PA 940
3from Eastside Borough to SR 8004,
4Kidder Township, Project ID 96437

 

5Project Allocation

2,602,000

6(Base Project Allocation - $2,601,000)

 

7(Design & Contingencies - $1,000)

 

8(3) SR 0248, Retaining Wall Repair, PA
9248, Lower Towamensing Township,
10Project ID 96418

 

11Project Allocation

7,502,000

12(Base Project Allocation - $7,500,000)

 

13(Land Allocation - $1,000)

 

14(Design & Contingencies - $1,000)

 

15(4) SR 0248, Highway Portion Bridge
16Rehabilitation, PA 248 over SR 2002
17(Delaware Avenue), East Penn Township,
18Project ID 92083

 

19Project Allocation

1,002,000

20(Base Project Allocation - $1,000,000)

 

21(Land Allocation - $1,000)

 

22(Design & Contingencies - $1,000)

 

23(5) SR 0443, Resurface, PA 443 from
24Lehighton Borough to US 209 at McCall
25Bridge, Lehighton Borough, Mahoning
26Township, Project ID 96414

 

27Project Allocation

6,668,000

28(Base Project Allocation - $6,667,000)

 

29(Design & Contingencies - $1,000)

 

30(6) SR 0093, Rehabilitation of ADA Ramps,

 

1PA 309 from the Schuylkill County Line
2to the Luzerne County Line, Banks
3Township, Beaver Meadows and
4Nesquehoning Boroughs, Packer
5Township, Project ID 96421

 

6Project Allocation

1,251,000

7(Base Project Allocation - $1,250,000)

 

8(Design & Contingencies - $1,000)

 

9(7) SR 0902, Highway Portion Bridge
10Rehabilitation, Ninth Street (SR 0902)
11over Mahoning Creek, Lehighton
12Borough, Project ID 92001

 

13Project Allocation

1,302,000

14(Base Project Allocation - $1,300,000)

 

15(Land Allocation - $1,000)

 

16(Design & Contingencies - $1,000)

 

17(8) SR 0903, Highway Resurface, SR 0903
18from SR 1002 to Old Stagecoach Road,
19Penn Forest Township, Project ID 95573

 

20Project Allocation

4,201,000

21(Base Project Allocation - $4,200,000)

 

22(Design & Contingencies - $1,000)

 

23(9) SR 0309, Pavement Rehabilitation, PA
24309 from the Schuylkill County Line to
25the Luzerne County Line, Banks
26Township, Project ID 96419

 

27Project Allocation

502,000

28(Base Project Allocation - $501,000)

 

29(Design & Contingencies - $1,000)

 

30(10) SR 0903, Highway Resurface, PA 903

 

1from Old Stagecoach Road to South Lake
2Drive, Kidder and Penn Forest
3Townships, Project ID 96436

 

4Project Allocation

3,202,000

5(Base Project Allocation - $3,201,000)

 

6(Design & Contingencies - $1,000)

 

7(11) SR 0209, Highway Resurface,
8Interchange Road (SR 0209) from TR 431
9to TR 534, Towamensing Township,
10Project ID 83088

 

11Project Allocation

1,902,000

12(Base Project Allocation - $1,901,000)

 

13(Design & Contingencies - $1,000)

 

14(12) SR 2010, ADA Ramps, SR 2010,
15Weissport, SR 2002, Palmerton, SR
163008, Lehighton, SR 2005, Bowmanstown,
17Bowmanstown Borough, Franklin
18Township, Lehighton, Palmerton and
19Weissport Boroughs, Project ID 94904

 

20Project Allocation

156,000

21(Base Project Allocation - $111,000)

 

22(Design & Contingencies - $45,000)

 

23(13) SR 0443, Highway Restoration,
24Drainage, Guiderail, Shoulders,
25Overlay and ADA Ramps, SR 0443 from
26Western Limits of Lehighton Borough to
27SR 0209 at McCall Bridge, Mahoning
28Township, Lehighton Borough, Project
29ID 88389

 

30Project Allocation

1,382,000

1(Base Project Allocation - $1,200,000)

 

2(Land Allocation - $76,000)

 

3(Design & Contingencies - $106,000)

 

4(14) SR 0248, Highway Rehabilitation, PA
5248 from US 209 to Northampton County
6Line, Bowmanstown Borough, East Penn,
7Franklin and Lower Towamensing
8Townships, Palmerton and Parryville
9Boroughs, Project ID 96478

 

10Project Allocation

35,001,000

11(Base Project Allocation -
12$34,999,000)

 

13(Land Allocation - $1,000)

 

14(Design & Contingencies - $1,000)

 

15(15) SR 2002, Highway Resurface, Delaware
16Avenue (SR 2002) from Mauch Chunk Road
17to SR 2001, Lower Towamensing
18Township, Palmerton Borough, Project
19ID 96438

 

20Project Allocation

2,001,000

21(Base Project Allocation - $2,000,000)

 

22(Design & Contingencies - $1,000)

 

23(16) SR 3001, Highway Portion Bridge
24Replacement, SR 3001 (Fritz Valley
25Road) over Normal Creek, Mahoning
26Township, Project ID 89629

 

27Project Allocation

1,101,000

28(Base Project Allocation - $1,100,000)

 

29(Design & Contingencies - $1,000)

 

30(17) SR 0209, Highway Resurface,

 

1Patterson Street (SR 0209) from
2Schuylkill County Line to Lansford
3Borough, Lansford and Summit Hill
4Boroughs, Project ID 83085

 

5Project Allocation

1,251,000

6(Base Project Allocation - $1,250,000)

 

7(Design & Contingencies - $1,000)

 

8(18) SR 0902, Highway Resurface, Spring
9Garden/North Pine (SR 0902) from US
10209 to between Lehigh and East Richard
11Streets, Lansford and Summit Hill
12Boroughs, Project ID 96435

 

13Project Allocation

651,000

14(Base Project Allocation - $650,000)

 

15(Design & Contingencies - $1,000)

 

16(19) I-80, Reconstruction, I-80 from the
17Luzerne County Line to the Monroe
18County Line, Various Municipalities,
19Project ID 0

 

20Project Allocation

40,600,000

21(Base Project Allocation -
22$40,600,000)

 

23(20) SR 0209, Resurface, SR 0209 from
24Preachers Camp Road to Monroe County
25Line, Towamensing Township, Project ID
26101532

 

27Project Allocation

956,000

28(Base Project Allocation - $926,000)

 

29(Design & Contingencies - $30,000)

 

30(21) SR 0903, Resurface, from PA Turnpike

 

1to Monroe County Line, Kidder and Penn
2Forest Townships, Project ID 101528

 

3Project Allocation

2,040,000

4(Base Project Allocation - $2,000,000)

 

5(Design & Contingencies - $40,000)

 

6Section 314. Centre County.

7Projects are as follows:

 

8(1) (Reserved).

 

9(2) SR 0045, SR 0192, SR 3041, Highway
10Reconstruction, Various Segments of SR
110045, SR 0192 and SR 3041, Benner,
12College, Haines, Miles and Penn
13Townships, Project ID 91100

 

14Project Allocation

2,747,000

15(Base Project Allocation - $2,747,000)

 

16(3) SR 0322, Highway Reconstruction, SR
170322 from Thompson Curve to the 4 Lane
18Segments, Rush Township, Project ID
1992736

 

20Project Allocation

1,000,000

21(Base Project Allocation - $1,000,000)

 

22(4) SR 0099, Roadway Resurfacing, Mount
23Nittany Expressway I-99 and SR 0322,
24College, Harris and Patton Townships,
25Project ID 92740

 

26Project Allocation

3,800,000

27(Base Project Allocation - $3,800,000)

 

28(5) SR 0099, Concrete Pavement
29Rehabilitation, Overlay, SR 0099
30Concrete Pavement Rehabilitation,

 

1Overlay, Taylor and Worth Townships,
2Project ID 91586

 

3Project Allocation

2,361,000

4(Base Project Allocation - $2,361,000)

 

5(6) I-99, Reconstruction, I-99 between
6Bald Eagle Valley Road and East of the
7Intersection with US 322, Worth
8Township, Project ID 91585

 

9Project Allocation

550,000

10(Base Project Allocation - $550,000)

 

11(7) I-99, Reconstruction, I-99 between
12Sellers Lane and SR 8022, Patton
13Township, Project ID 91584

 

14Project Allocation

660,000

15(Base Project Allocation - $660,000)

 

16(8) SR 2005, Highway Portion Bridge
17Replacement, SR 2005 over Sinking
18Creek, Segments 0020 Offset 0839 Near
19Spring Mills, Gregg Township, Project
20ID 91500

 

21Project Allocation

1,050,000

22(Base Project Allocation - $791,000)

 

23(Land Allocation - $49,000)

 

24(Design & Contingencies - $210,000)

 

25(9) SR 0192, Highway Reconstruction, SR
260192 from Spring Bank to Wolfs Store,
27Miles Township, Project ID 91963

 

28Project Allocation

600,000

29(Base Project Allocation - $400,000)

 

30(Design & Contingencies - $200,000)

 

1(10) SR 0144, Safety Improvements, SR
20144 Nectarine Road, Segments
30620/1854 to 0620/2425, Snow Shoe
4Township, Snow Shoe Borough, Project
5ID 91959

 

6Project Allocation

300,000

7(Base Project Allocation - $200,000)

 

8(Design & Contingencies - $100,000)

 

9(11) SR 0322, Safety Improvements, SR
100322 near Sharer Road, Harris
11Township, Project ID 91958

 

12Project Allocation

300,000

13(Base Project Allocation - $200,000)

 

14(Design & Contingencies - $100,000)

 

15(12) SR 0144, Safety Improvements, SR
160144 Segments 0010/2395 to 0020/0957,
17Potter Township, Project ID 91955

 

18Project Allocation

300,000

19(Base Project Allocation - $200,000)

 

20(Design & Contingencies - $100,000)

 

21(13) SR 0045, Safety Improvements, SR
220045 at Kline Road Intersection, Gregg
23Township, Project ID 91954

 

24Project Allocation

300,000

25(Base Project Allocation - $200,000)

 

26(Design & Contingencies - $100,000)

 

27(14) SR 0477, Safety Improvements, SR
280477, Segment 0010, Miles Township,
29Project ID 91953

 

30Project Allocation

300,000

1(Base Project Allocation - $200,000)

 

2(Design & Contingencies - $100,000)

 

3(15) SR 0322, Safety Improvements, SR
40322 near Satellite Building, Rush
5Township, Project ID 91956

 

6Project Allocation

300,000

7(Base Project Allocation - $200,000)

 

8(Design & Contingencies - $100,000)

 

9(16) SR 3003, Safety and Intersection
10Improvements, SR 3005 Airport
11Intersection, Benner Township, Project
12ID 93263

 

13Project Allocation

900,000

14(Land Allocation - $400,000)

 

15(Design & Contingencies - $500,000)

 

16(17) SR 0192, Reconstruction, SR 0192,
17Segments 0400 through 0610 and Other
18Various Locations, Various
19Municipalities, Project ID 91072

 

20Project Allocation

12,175,000

21(Base Project Allocation -
22$12,175,000)

 

23(18) SR 0192, SR 2012, Highway
24Reconstruction, SR 0192 and SR 2012,
25College, Gregg, Haines, Huston, Miles,
26Penn and Potter Townships, Millheim
27Borough, Project ID 91075

 

28Project Allocation

9,740,000

29(Base Project Allocation - $9,740,000)

 

30(19) SR 0144, Resurface, PA 144, Bishop

 

1Street to Molasses Hill, Segments
20280/0000 to 0340/0000, Bellefonte
3Borough, Spring Township, Project ID
491093

 

5Project Allocation

300,000

6(Base Project Allocation - $300,000)

 

7(20) SR 3005, SR 3029, SR 3049, Highway
8Reconstruction, Various Segments of SR
93005, SR 3029, SR 3049, Benner,
10College, Patton, Rush and Worth
11Townships, Port Matilda Borough,
12Project ID 91095

 

13Project Allocation

520,000

14(Base Project Allocation - $520,000)

 

15(21) SR 0150, Highway Restoration,
16Various Segments on SR 0045, SR 0144,
17SR 0150, SR 0322, SR 1016 and SR 3010,
18Various Municipalities, Project ID
1991097

 

20Project Allocation

3,750,000

21(Base Project Allocation - $3,750,000)

 

22(22) SR 0322, Safety Improvements, SR
230322 Intersection with SR 0144,
24Potters Mills, Potter Township,
25Project ID 91952

 

26Project Allocation

300,000

27(Base Project Allocation - $200,000)

 

28(Design & Contingencies - $100,000)

 

29(23) SR 0045, Add Lane/Widen, SR 0045 and
30SR 2006, Segment/Offset 0292/0000 to

 

10310/0000, Segment/Offset 0010/0000,
2Harris Township, Project ID 93267

 

3Project Allocation

914,000

4(Base Project Allocation - $914,000)

 

5(24) SR 3040, Reconstruction, Drainage
6and Shoulders, SR 3040, Segments 0280
7to 0370/2238, Huston and Union
8Townships, Unionville Borough, Project
9ID 91102

 

10Project Allocation

5,000,000

11(Base Project Allocation - $5,000,000)

 

12(25) SR 0026, Intersection Improvement,
13SR 0026 and SR 0150 Intersections,
14Segment/Offset 0640/0421 to 0640/2150,
15Segment/Offset 0310/2500 to 0320/1000,
16Howard Township, Project ID 93262

 

17Project Allocation

759,000

18(Base Project Allocation - $701,000)

 

19(Land Allocation - $29,000)

 

20(Design & Contingencies - $29,000)

 

21(26) SR 0350, Left Turn Lane, SR 0350,
22Glass City Road, Dale Road, Sleepy
23Hollow Road, Rush Township, Project ID
2493260

 

25Project Allocation

530,000

26(Base Project Allocation - $307,000)

 

27(Land Allocation - $97,000)

 

28(Design & Contingencies - $126,000)

 

29(27) SR 0322, Highway Resurfacing, SR
300322, Philipsburg to Port Mountain,

 

1Segment/Offset 0052/0000 to 0150/0000,
2Rush Township, Project ID 93256

 

3Project Allocation

4,102,000

4(Base Project Allocation - $3,901,000)

 

5(Design & Contingencies - $201,000)

 

6(28) SR 0322, Highway Resurfacing, SR
70322, Port Matilda Mountain, Segments
80150/0000 to 0272/0000, Rush and Worth
9Townships, Project ID 93255

 

10Project Allocation

989,000

11(Base Project Allocation - $593,000)

 

12(Land Allocation - $45,000)

 

13(Design & Contingencies - $351,000)

 

14(29) SR 0026, Highway Reconstruction, SR
150026, Segments 0510 through 0640 and
16Other Various Locations, Howard and
17Marion Townships, Howard Borough,
18Project ID 91099

 

19Project Allocation

863,000

20(Base Project Allocation - $863,000)

 

21(30) SR 0045, Congestion Improvement, SR
220045, Segments/Offset 0140/0000 to
230240/0000, Ferguson and Harris
24Townships, Project ID 93367

 

25Project Allocation

60,000

26(Design & Contingencies - $60,000)

 

27(31) SR 0026, Highway Restoration,
28Various Segments on SR 0026, SR 0045,
29SR 0150, SR 0192, SR 0120, SR 0477, SR
304001, Various Municipalities in Centre

 

1and Clinton Counties, Project ID 91098

 

2Project Allocation

3,806,000

3(Base Project Allocation - $3,806,000)

 

4(32) SR 0026, Safety and Intersection
5Improvements, Intersection of SR 0026
6and SR 0064, Spring Township, Project
7ID 95827

 

8Project Allocation

1,500,000

9(Base Project Allocation - $1,500,000)

 

10(33) SR 2003, Highway Restoration, SR
110192 Stover Gap Road to Union County
12Line, Miles Township, Project ID 88341

 

13Project Allocation

500,000

14(Base Project Allocation - $500,000)

 

15(34) SR 0948, Highway Restoration, SR
160322 Satellite to Top of Port Matilda
17Mountain, Rush Township, Project ID
1888342

 

19Project Allocation

300,000

20(Base Project Allocation - $300,000)

 

21(35) SR 3040, Highway Betterment Project,
22SR 3040, Alternate 220 Bottom of Sky
23Top Mountain to County Line, Segments
240190/2084 to 0370/2238, Huston and
25Union Townships, Unionville Borough,
26Worth Township, Project ID 88343

 

27Project Allocation

1,800,000

28(Base Project Allocation - $1,800,000)

 

29(36) SR 3014, Highway Portion Bridge
30Replacement, SR 3014 over SR 0322,

 

1Patton Township, Project ID 88353

 

2Project Allocation

201,000

3(Base Project Allocation - $201,000)

 

4(37) SR 3014, Safety Improvements, SR
53014, North Atherton Street,
6Southbound, Segments 0030 to 0180,
7State College Borough, Patton,
8Ferguson, College and Harris
9Townships, Project ID 95832

 

10Project Allocation

2,000,000

11(Base Project Allocation - $1,500,000)

 

12(Land Allocation - $200,000)

 

13(Design & Contingencies - $300,000)

 

14(38) SR 3014, Reconstruction and Drainage
15Work, SR 3014, North and South
16Atherton Street, Segments 0030/0000 to
170180/1500 and 0031/0000 to 0181/1550,
18College, Ferguson, Harris and Patton
19Townships, State College Borough,
20Project ID 89019

 

21Project Allocation

7,347,000

22(Base Project Allocation - $6,155,000)

 

23(Land Allocation - $791,000)

 

24(Design & Contingencies - $401,000)

 

25(39) SR 0026, Safety Improvements, SR
260026, Buckhout to Struble Road, State
27College Borough, College Township,
28Project ID 95828

 

29Project Allocation

1,950,000

30(Base Project Allocation - $1,500,000)

 

1(Land Allocation - $150,000)

 

2(Design & Contingencies - $300,000)

 

3(40) SR 0006, Highway Restoration, SR
40045, Segments 0060/0000 to 0690/0000,
5Millheim Borough, Penn Township,
6Project ID 88268

 

7Project Allocation

300,000

8(Base Project Allocation - $300,000)

 

9(41) I-80, Highway Reconstruction, I-80,
10Segments 1520 through 1590, Boggs
11Township, Project ID 88577

 

12Project Allocation

300,000

13(Base Project Allocation - $300,000)

 

14(42) I-99, Highway Reconstruction, I-99,
15Segments 0694 through 0740, College
16and Patton Townships, Project ID 88578

 

17Project Allocation

2,500,000

18(Base Project Allocation - $2,500,000)

 

19(43) I-99, Concrete Pavement
20Rehabilitation and Guiderail
21Improvements, I-99, Segments 0740
22through 0820, Benner, College and
23Spring Townships, Project ID 88581

 

24Project Allocation

2,500,000

25(Base Project Allocation - $2,500,000)

 

26(44) I-99, Concrete Pavement
27Rehabilitation and Guiderail
28Improvements, I-99, Segments 0680
29through 0650, Huston, Patton and Worth
30Townships, Project ID 88582

 

1Project Allocation

1,400,000

2(Base Project Allocation - $1,400,000)

 

3(45) I-99, Reconstruction, I-99, Segments
40694 through 0680, Patton Township,
5Project ID 88583

 

6Project Allocation

1,000,000

7(Base Project Allocation - $1,000,000)

 

8(46) SR 0026, Installation of Truck
9Escape Ramp, SR 0026, Pine Grove
10Mountain II, Segments 0040/1150 to
110040/2650, Ferguson Township, Project
12ID 88629

 

13Project Allocation

516,000

14(Base Project Allocation - $200,000)

 

15(Land Allocation - $41,000)

 

16(Design & Contingencies - $275,000)

 

17(47) SR 0045, Highway Portion Bridge
18Preservation Activities, PA 45 over
19Elk Creek and PA 144 over Irish
20Hollow, Millheim Borough, Spring
21Township, Project ID 94957

 

22Project Allocation

600,000

23(Base Project Allocation - $600,000)

 

24(48) SR 3014, Safety Improvements, SR
253014, North Atherton Street,
26Northbound, Segments 0023 to 0105,
27State College Borough, Patton and
28Ferguson Townships, Project ID 95831

 

29Project Allocation

2,000,000

30(Base Project Allocation - $1,500,000)

 

1(Land Allocation - $200,000)

 

2(Design & Contingencies - $300,000)

 

3(49) SR 4005, Highway Portion Bridge
4Replacement, SR 4005 over SR 0080, I-
580, Segment 0010 Offset 0240, Snow
6Shoe Township, Project ID 88217

 

7Project Allocation

358,000

8(Base Project Allocation - $281,000)

 

9(Land Allocation - $43,000)

 

10(Design & Contingencies - $34,000)

 

11(50) SR 0322, New Alignment and
12Relocation of 4 Lane Roadway, SR 0322,
13Segments 0570 to 0770, Harris and
14Potter Townships, Project ID 96820

 

15Project Allocation

307,000,000

16(Base Project Allocation -
17$250,000,000)

 

18(Land Allocation - $32,000,000)

 

19(Design & Contingencies - $25,000,000)

 

20(51) SR 0144, Highway Portion Bridge
21Rehabilitation, SR 0144 over Bald
22Eagle Creek, BMS 14-0144-0370-0654,
23Boggs Township, Milesburg Borough,
24Project ID 69434

 

25Project Allocation

205,000

26(Base Project Allocation - $177,000)

 

27(Land Allocation - $28,000)

 

28(52) SR 0026, Roadway
29Restoration/Resurfacing, SR 0026,
30Jacksonville Road, Segments 0470/0169

 

1to 0510/0609, Marion Township, Project
2ID 85965

 

3Project Allocation

2,051,000

4(Base Project Allocation - $1,000,000)

 

5(Land Allocation - $1,000,000)

 

6(Design & Contingencies - $51,000)

 

7(53) Build Park and Ride Lot, Philipsburg
8Area, Philipsburg Borough, Project ID
987155

 

10Project Allocation

1,800,000

11(Base Project Allocation - $1,000,000)

 

12(Land Allocation - $500,000)

 

13(Design & Contingencies - $300,000)

 

14(54) SR 0144, Highway Portion Bridge
15Replacement, SR 0144 over South Fork
16Beech Creek, BMS 14-0144-0560-1203,
17Boggs and Snow Shoe Townships, Project
18ID 88170

 

19Project Allocation

728,000

20(Base Project Allocation - $728,000)

 

21(55) SR 3011, Highway Portion Bridge
22Replacement, SR 3011 over Slab Cabin
23Run, BMS 14-3011-0040-0000, College
24Township, State College Borough,
25Project ID 88189

 

26Project Allocation

387,000

27(Base Project Allocation - $295,000)

 

28(Land Allocation - $92,000)

 

29(56) SR 0045, Highway Portion Bridge
30Replacement, SR 0045 over Elk Creek,

 

1Millheim Borough, Project ID 88193

 

2Project Allocation

238,000

3(Base Project Allocation - $106,000)

 

4(Land Allocation - $85,000)

 

5(Design & Contingencies - $47,000)

 

6(57) SR 0219, Highway Restoration, SR
70192 Elk Creek to Stover Gap Road,
8Miles Township, Project ID 88340

 

9Project Allocation

 

10(Base Project Allocation - $650,000)

650,000

11(58) SR 3040, Highway Portion Bridge
12Replacement, SR 3040 over Laurel Run,
13BMS 14-3040-0280-1591, Huston
14Township, Project ID 88206

 

15Project Allocation

984,000

16(Base Project Allocation - $675,000)

 

17(Land Allocation - $58,000)

 

18(Design & Contingencies - $251,000)

 

19(59) SR 0120, Highway Restoration, SR
200192, SR 0445, Elk Creek, Miles
21Township, Project ID 88339

 

22Project Allocation

600,000

23(Base Project Allocation - $600,000)

 

24(60) SR 0322, Highway Reconstruction, SR
250322, Segments 0770/0000 to 0820,
26Potters Mills to Sand Mountain Road,
27Potter Township, Project ID 96370

 

28Project Allocation

1,000,000

29(Design & Contingencies - $1,000,000)

 

30(61) SR 3014, Highway Portion Bridge

 

1Replacement, SR 3014 over Slab Cabin
2Run, Segments 0140 Offset 1699, State
3College Borough, Project ID 88235

 

4Project Allocation

3,980,000

5(Base Project Allocation - $3,287,000)

 

6(Land Allocation - $130,000)

 

7(Design & Contingencies - $563,000)

 

8(62) SR 3014, Safety improvements, SR
90026, Jacksonville Road to SR 0150,
10Segments 0510/0000 to 0640/2150,
11Howard Borough, Howard and Marion
12Townships, Project ID 88259

 

13Project Allocation

400,000

14(Base Project Allocation - $100,000)

 

15(Land Allocation - $100,000)

 

16(Design & Contingencies - $200,000)

 

17(63) SR 0153, Safety Improvements, SR
180150, Segments 0030/0000 to 0150/0200,
19College, Benner and Spring Townships,
20Bellefonte Borough, Rush Township,
21Project ID 88261

 

22Project Allocation

400,000

23(Base Project Allocation - $100,000)

 

24(Land Allocation - $100,000)

 

25(Design & Contingencies - $200,000)

 

26(64) SR 0219, Safety Improvements, SR
273014, Atherton Street, Patton and
28Ferguson Townships, State College
29Borough, College and Harris Townships,
30Project ID 88262

 

1Project Allocation

400,000

2(Base Project Allocation - $100,000)

 

3(Land Allocation - $100,000)

 

4(Design & Contingencies - $200,000)

 

5(65) SR 0066, Highway Restoration, SR
63014, South Atherton, Segment
70104/0000 to 0190/0000, State College
8Borough, College and Harris Townships,
9Project ID 88267

 

10Project Allocation

700,000

11(Base Project Allocation - $700,000)

 

12(66) SR 0044, Safety Improvements, SR
130144 to Bumbarger Lane, Spring
14Township, Bellefonte Borough, Boggs
15and Burnside Townships, Project ID
1688260

 

17Project Allocation

400,000

18(Base Project Allocation - $100,000)

 

19(Land Allocation - $100,000)

 

20(Design & Contingencies - $200,000)

 

21(67) SR 0045, Highway Portion Bridge
22Replacement, SR 0045 over Pine Creek,
23BMS 14-0045-0790-2031, Haines
24Township, Project ID 88201

 

25Project Allocation

1,931,000

26(Base Project Allocation - $1,357,000)

 

27(Land Allocation - $108,000)

 

28(Design & Contingencies - $466,000)

 

29(68) SR 0099, Embankment Removal and
30Guiderail Updates, I-99, Benner,

 

1College, Huston, Patton, Spring,
2Taylor and Worth Townships, Project ID
389251

 

4Project Allocation

100,000

5(Base Project Allocation - $100,000)

 

6(69) SR 0080, Signing, Mile Marker Sign,
7Segments 0080/1380 through 0080/1700,
8Various, Project ID 89243

 

9Project Allocation

250,000

10(Base Project Allocation - $250,000)

 

11(70) SR 0026, SR 0064, SR 0322, Guiderail
12Improvements, Various Segments of SR
130026, SR 0064, SR 0322, Various
14Municipalities, Project ID 89246

 

15Project Allocation

500,000

16(Base Project Allocation - $500,000)

 

17(71) SR 0144, Roadway Resurfacing,
18Milesburg Interchange, Segments
190144/0150, Boggs Township, Milesburg
20Borough, Project ID 89247

 

21Project Allocation

820,000

22(Base Project Allocation - $820,000)

 

23(72) SR 4002, Betterment, Restoration, SR
244000 Quad Routes, Boggs and Rush
25Townships, Snow Shoe Borough, Snow
26Shoe and Union Townships, Project ID
27101995

 

28Project Allocation

8,905,000

29(Base Project Allocation - $8,755,00)

 

30(Design & Contingencies - $150,000)

 

1(73) SR 3040, Resurface, SR 3040,
2Silverdale Road to PA 504, Segments
30270/0000 to 0370/2238, Huston and
4Union Townships, Unionville Borough,
5Project ID 100563

 

6Project Allocation

2,100,000

7(Base Project Allocation - $2,100,000)

 

8(74) SR 0504, Resurface, PA 504, Black
9Bear Run to SR 3032, Segments
100080/0000 to 0170/2195, Rush Township,
11Project ID 100538

 

12Project Allocation

900,000

13(Base Project Allocation - $900,000)

 

14(75) SR 3010, Resurface, SR 3010, Oak
15Hall Interchange, Segments 0060/0000
16to 0070/1945, College and Harris
17Townships, Project ID 101035

 

18Project Allocation

772,000

19(Base Project Allocation - $772,000)

 

20(76) SR 0879, Resurface, SR 0879,
21Karthaus to the Crossroads, Segments
220010/0000 to 0170/1859, Burnside and
23Snow Shoe Townships, Project ID 101031

 

24Project Allocation

3,200,000

25(Base Project Allocation - $3,200,000)

 

26(77) SR 3041, Resurface, SR 3041, Shiloh
27Road, Segments 0010/0000 to 0020/4370,
28Benner and College Townships, Project
29ID 101042

 

30Project Allocation

626,000

1(Base Project Allocation - $626,000)

 

2(78) SR 3042, Resurface, SR 3042, Laurel
3Run Road to Port Matilda, Segments
40274/0000 to 0302/0000, Port Matilda
5Borough, Worth Township, Project ID
6101045

 

7Project Allocation

500,000

8(Base Project Allocation - $500,000)

 

9(79) SR 0150, Resurface, SR 0150, PA 26
10to County Line, Segments 0320/1279 to
110430/1820, Howard and Liberty
12Townships, Project ID 100546

 

13Project Allocation

1,060,000

14(Base Project Allocation - $1,060,000)

 

15(80) SR 0045, Resurface, SR 0045, Old
16Fort to Spring Mills, Segments
170430/000 to 0530/0000, Gregg Township,
18Potter Township, Project ID 100551

 

19Project Allocation

1,002,000

20(Base Project Allocation - $1,002,000)

 

21(81) SR 3020, Resurface, SR 3020,
22University Drive, Whitehall Road to
23Atherton Street, Segments 0010/0000 to
240020/1513, College Township, State
25College Borough, Project ID 100545

 

26Project Allocation

200,000

27(Base Project Allocation - $200,000)

 

28(82) SR 0550, Resurface, SR 0550, Blair
29County Line to Eagle Spring Road,
30Segments 0010/0000 to 0160/2505, Half

 

1Moon and Patton Townships, Project ID
2101056

 

3Project Allocation

7,300,000

4(Base Project Allocation - $7,300,000)

 

5(83) SR 0192, Resurface, Livonia to
6County Line, Miles Township, Project
7ID 100528

 

8Project Allocation

1,223,000

9(Base Project Allocation - $1,223,000)

 

10(84) SR 0045, Resurface, SR 0045, Cedar
11Run Road to Old Fort, Segments
120320/000 to 0410/1950, Harris and
13Potter Townships, Project ID 10126

 

14Project Allocation

3,345,000

15(Base Project Allocation - $3,345,000)

 

16(85) SR 1010, Resurface, SR 1010, PA 64
17to Jacksonville Road, Segments
180014/0000 to 0150/2284, Marion and
19Walker Townships, Project ID 100562

 

20Project Allocation

1,500,000

21(Base Project Allocation - $1,500,000)

 

22(86) SR 2012, Resurface, SR 2012,
23Greenbriar Road to Coburn Road,
24Segments 0230/0000 to 0270/3149, Penn
25Township, Project ID 100534

 

26Project Allocation

434,000

27(Base Project Allocation - $434,000)

 

28(87) SR 3001, Betterment, Restoration, SR
293000 Quad Routes, Various, Project ID
30101993

 

1Project Allocation

36,236,000

2(Base Project Allocation -
3$36,085,000)

 

4(Design & Contingencies - $151,000)

 

5(88) SR 0026, Resurface, SR 0026,
6Ferguson Township to College Avenue
7Southbound, Segments 0143/0000 to
80181/0000, Ferguson Township, State
9College Borough, Project ID 101008

 

10Project Allocation

600,000

11(Base Project Allocation - $600,000)

 

12(89) SR 0026, Resurface, SR 0026,
13Ferguson Township to College Avenue
14Northbound, Segments 0142/0000 to
150180/0000, Ferguson Township, State
16College Borough, Project ID 101003

 

17Project Allocation

600,000

18(Base Project Allocation - $600,000)

 

19(90) SR 3017, Resurface, SR 3017, PA 550
20to SR 3042, Segments 0010/0000 to
210050/0802, Half Moon Township, Port
22Matilda Borough, Worth Township,
23Project ID 100554

 

24Project Allocation

550,000

25(Base Project Allocation - $550,000)

 

26(91) SR 3005, Resurface, SR 3005, SR 3007
27to Fox Hill Road, Segments 0010/0000
28to 0070/2676, Benner Township, College
29and Patton Townships, Project ID
30100557

 

1Project Allocation

720,000

2(Base Project Allocation - $720,000)

 

3(92) SR 0350, Resurface, SR 0350,
4Linnwood Development to Presqueisle
5Street, Segments 0200/0000 to
60260/0357, Philipsburg Borough, Rush
7Township, Project ID 100559

 

8Project Allocation

800,000

9(Base Project Allocation - $800,000)

 

10(93) SR 0504, Resurface, SR 0504, Black
11Moshannon to Wallace Run, Segments
120180/0000 to 0340/1389, Rush and Union
13Townships, Project ID 100560

 

14Project Allocation

2,000,000

15(Base Project Allocation - $2,000,000)

 

16(94) SR 0144, Resurface, SR 0144, Centre
17Hall, Segments 0090/0000 to 0130/0000,
18Centre Hall Borough, Potter Township,
19Project ID 101028

 

20Project Allocation

1,132,000

21(Base Project Allocation - $1,132,000)

 

22(95) SR 0045, Betterment, Restoration, PA
2345, Ferguson, Harris and Potter
24Townships, Project ID 101509

 

25Project Allocation

4,461,000

26(Base Project Allocation - $4,310,000)

 

27(Design & Contingencies - $151,000)

 

28(96) SR 0322, Resurface, SR 0322,
29Clearfield County Line to Cold Stream,
30Segments 0012/0000 to 0052/0000,

 

1Philipsburg Borough, Rush Township,
2Project ID 100594

 

3Project Allocation

500,000

4(Base Project Allocation - $500,000)

 

5(97) SR 0192, Betterment, Restoration, PA
6192, Centre Hall Borough, Gregg and
7Potter Townships, Project ID 101514

 

8Project Allocation

3,875,000

9(Base Project Allocation - $3,725,000)

 

10(Design & Contingencies - $150,000)

 

11(98) SR 0322, Betterment, Restoration, US
12322, Harris, Potter, Rush and Worth
13Townships, Project ID 101539

 

14Project Allocation

4,371,000

15(Base Project Allocation - $4,221,000)

 

16(Design & Contingencies - $150,000)

 

17(99) SR 3010, Rehabilitation, Resurface,
18SR 3010, Oak Hall Intersection,
19College and Harris Townships, Project
20ID 99528

 

21Project Allocation

2,039,000

22(Base Project Allocation - $2,039,000)

 

23(100) SR 0150, Betterment, Restoration,
24PA 150, Boggs, College and Howard
25Townships, Project ID 101513

 

26Project Allocation

4,285,000

27(Base Project Allocation - $4,135,000)

 

28(Design & Contingencies - $150,000)

 

29(101) I-80, Reconstruction, I-80 from the
30Clearfield County Line to the Clinton

 

1County Line, Various Municipalities,
2Project ID 0

 

3Project Allocation

131,000,000

4(Base Project Allocation -
5$131,000,000)

 

6(102) SR 0053, Betterment, Restoration,
7PA 53, Snow Shoe Township, Project ID
8101506

 

9Project Allocation

1,617,000

10(Base Project Allocation - $1,466,000)

 

11(Design & Contingencies - $151,000)

 

12(103) SR 0322, Resurface, SR 0322, Bypass
13to Boalsburg Westbound, Segments
140541/0000 to 0585/1074, College and
15Harris Townships, Project ID 100586

 

16Project Allocation

1,000,000

17(Base Project Allocation - $1,000,000)

 

18(104) SR 0026, Betterment, Restoration,
19PA 26, Ferguson Township, Howard
20Borough, Howard and Spring Townships,
21Project ID 101511

 

22Project Allocation

2,531,000

23(Base Project Allocation - $2,381,000)

 

24(Design & Contingencies - $150,000)

 

25(105) SR 0064, Betterment, Restoration,
26PA 64, Spring and Walker Townships,
27Project ID 101512

 

28Project Allocation

6,526,000

29(Base Project Allocation - $6,376,000)

 

30(Design & Contingencies - $150,000)

 

1(106) SR 0350, Resurface, SR 0350, Blair
2County to Sandy Ridge, Segments
30010/0000 to 0130/0000, Rush and
4Taylor Townships, Project ID 100590

 

5Project Allocation

3,000,000

6(Base Project Allocation - $3,000,000)

 

7(107) SR 0144, Betterment, Restoration,
8PA 144, Boggs, Burnside and Potter
9Townships, Snow Shoe Borough, Snow
10Shoe and Spring Townships, Project ID
11101501

 

12Project Allocation

17,221,000

13(Base Project Allocation -
14$17,071,000)

 

15(Design & Contingencies - $150,000)

 

16(108) SR 0080, Betterment, Restoration,
17I-80, Boggs, Marion and Rush
18Townships, Snow Shoe Borough, Snow
19Shoe and Spring Townships, Project ID
20101609

 

21Project Allocation

19,412,000

22(Base Project Allocation -
23$19,261,000)

 

24(Design & Contingencies - $151,000)

 

25(109) I-99, Reconstruction, I-99 from the
26Blair County Line to its Northern
27Terminus at I-80, Various
28Municipalities, Project ID 0

 

29Project Allocation

119,400,000

30(Base Project Allocation -

 

1$119,400,000)

 

2(110) SR 0026, Resurface, SR 0026, High
3Street to SR 9012 Southbound, Segments
40181/0000 to 0247/0670, College
5Township, State College Borough,
6Project ID 100571

 

7Project Allocation

1,250,000

8(Base Project Allocation - $1,250,000)

 

9(111) SR 2001, Betterment, Restoration,
10SR 2000 Quad Routes, Various, Project
11ID 101989

 

12Project Allocation

19,402,000

13(Base Project Allocation -
14$19,251,000)

 

15(Design & Contingencies - $151,000)

 

16(112) SR 1001, Betterment, Restoration,
17SR 1000 Quad Routes, Various, Project
18ID 101987

 

19Project Allocation

15,120,000

20(Base Project Allocation -
21$14,970,000)

 

22(Design & Contingencies - $150,000)

 

23(113) SR 3027, Resurface, SR 3049 to
24Stone Street, Rush Township, Project
25ID 100564

 

26Project Allocation

250,000

27(Base Project Allocation - $250,000)

 

28(114) SR 0026, Resurface, SR 0026, County
29Line to SR 3018, Segments 0010/0000 to
300090/1853, Ferguson Township, Project

 

1ID 100565

 

2Project Allocation

1,632,000

3(Base Project Allocation - $1,632,000)

 

4(115) SR 0322, Resurface, SR 0322, Bypass
5to Boalsburg Interchange Eastbound,
6Segments 0540/0000 to 0590/0000,
7College and Harris Townships, Project
8ID 100583

 

9Project Allocation

1,000,000

10(Base Project Allocation - $1,000,000)

 

11(116) SR 0045, Resurface, SR 0045,
12Millhiem to County Line, Segments
130670/2711 to 0880/1958, Haines
14Township, Millheim Borough, Penn
15Township, Project ID 100549

 

16Project Allocation

3,240,000

17(Base Project Allocation - $3,240,000)

 

18(117) SR 0550, Resurface, SR 0550, SR
193042 to Park Avenue, Segments
200190/0000 to 0390/0000, Benner, Patton
21and Spring Townships, Project ID
22100580

 

23Project Allocation

3,876,000

24(Base Project Allocation - $3,876,000)

 

25(118) SR 0026, Highway Portion Bridge
26Replacement, SR 0026 over Lick Run,
27Segment 0590/1750, Marion Township,
28Project ID 99872

 

29Project Allocation

448,000

30(Base Project Allocation - $199,000)

 

1(Land Allocation - $50,000)

 

2(Design & Contingencies - $199,000)

 

3(119) SR 3040, Betterment, Restoration,
4SR 3040, Huston Township, Port Matilda
5Borough, Taylor and Worth Townships,
6Project ID 101633

 

7Project Allocation

6,397,000

8(Base Project Allocation - $6,246,000)

 

9(Design & Contingencies - $151,000)

 

10(120) Various, Highway Portion Bridge
11Preservation Activities, Various State
12Routes, Various Municipalities,
13Project ID 94960

 

14Project Allocation

744,000

15(Base Project Allocation - $744,000)

 

16(121) Various, Tree Trimming Safety
17Improvements, Various Highways and
18Segments throughout Centre County,
19Various Municipalities, Project ID
2088350

 

21Project Allocation

500,000

22(Base Project Allocation - $500,000)

 

23Section 315. Chester County.

24Projects are as follows:

 

25(1) (Reserved).

 

26(2) US 30 Corridor, Reconstruction and
27Widening, West of PA 10 to East of SR
284005, Reeceville Road, Sadsbury,
29Valley and Caln Townships, Project ID
3084884

 

1Project Allocation

240,356,000

2(Base Project Allocation -
3$240,356,000)

 

4(3) SR 0023, Highway Portion Bridge
5Rehabilitation, SR 0023 over Pickering
6Creek, Honey Brook and Schuylkill
7Townships, Project ID 89697

 

8Project Allocation

516,000

9(Base Project Allocation - $516,000)

 

10(4) SR 0100, Safety Improvement, SR 0100
11Corridor, Upper Uwchlan Township,
12Project ID 92964

 

13Project Allocation

615,000

14(Base Project Allocation - $615,000)

 

15(5) SR 0030, Reconstruct, US 30 Bypass,
16East Caln Township, Project ID 87781

 

17Project Allocation

277,347,000

18(Base Project Allocation -
19$277,347,000)

 

20(6) SR 0089, PA 896, Safety Improvement,
21SR 0089, PA 896 Corridors, Various,
22Project ID 85949

 

23Project Allocation

4,318,000

24(Base Project Allocation - $4,318,000)

 

25(7) SR 0202, Intersection Improvements,
26SR 0202 Intersections with SR 0926,
27Thornbury and Westtown Townships,
28Project ID 95430

 

29Project Allocation

470,000

30(Base Project Allocation - $240,000)

 

1(Land Allocation - $30,000)

2(Design & Contingencies - $200,000)

 

3(8) SR 3033, Safety Improvements, SR 3033
4(Newark Road) Approaches to SR 0041,
5New Garden Township, Project ID 98096

 

6Project Allocation

284,000

7(Base Project Allocation - $215,000)

 

8(Land Allocation - $19,000)

9(Design & Contingencies - $50,000)

 

10(9) SR 0100, Corridor Safety Improvement,
110100/0370 through 0100/0581, Various,
12Project ID 80042

 

13Project Allocation

2,222,000

14(Base Project Allocation - $2,222,000)

 

15(10) SR 0001, Resurface, Route 1
16Northbound (Left Lane) from 3 7/10
17Mile Marker to Tweed Creek, East
18Nottingham and Lower Oxford Townships,
19Project ID 102380

 

20Project Allocation

170,000

21(Base Project Allocation - $150,000)

 

22(Design & Contingencies - $20,000)

 

23(11) SR 0030, Resurface, Route 30 from SR
240252 (Bear Hill/Leopard Road) to
25Delaware County Line, Tredyffrin and
26Easttown Townships, Project ID 102379

 

27Project Allocation

3,620,000

28(Base Project Allocation - $3,600,000)

 

29(Design & Contingencies - $20,000)

 

30(12) SR 0001, Resurface, Route 1 from

 

1Tweed Creek to Newark Road and SR 8005
2(Route 10 Interchange), Lower Oxford
3and Upper Oxford Townships, Project ID
4102380

 

5Project Allocation

3,520,000

6(Base Project Allocation - $3,500,000)

 

7(Design & Contingencies - $20,000)

 

8(13) Various, Highway Portion Bridge
9Replacement, Various State Routes,
10Various Municipalities in Chester,
11Delaware and Montgomery Counties,
12Project ID 92311

 

13Project Allocation

2,765,000

14(Base Project Allocation - $2,370,000)

 

15(Design & Contingencies - $395,000)

 

16Section 316. Clarion County.

17Projects are as follows:

 

18(1) (Reserved).

 

19(2) SR 1007, Resurface, Along SR 1007
20(Greenville Pike) from a Point 0.07
21Mile North of Rehobeth Church Road to
22US 322 (Main Street), Clarion Borough,
23Clarion Township, Project ID 91864

 

24Project Allocation

900,000

25(Base Project Allocation - $900,000)

 

26(3) SR 0208, Resurface, Along SR 0208
27from US 322 to its Intersection with
28PA 157, Elk Township, Shippensville
29Borough, Washington Township, Project
30ID 95588

 

1Project Allocation

3,400,000

2(Base Project Allocation - $3,400,000)

 

3(4) SR 0208, Highway Reconstruction, SR
40208 from SR 0322 to SR 0157, Beaver
5Township, Knox Borough, Project ID
691308

 

7Project Allocation

444,000

8(Base Project Allocation - $444,000)

 

9(5) SR 0066, Safety Improvement, SR 0066
10at SR 4033 Tylersburg Road, Farmington
11Township, Project ID 91301

 

12Project Allocation

530,000

13(Base Project Allocation - $530,000)

 

14(6) SR 3020, Highway Portion Bridge
15Rehabilitation, SR 3020 (Master Road)
16over I-80 (Eastbound and Westbound),
17Richland Township, Project ID 92664

 

18Project Allocation

160,000

19(Base Project Allocation - $160,000)

 

20(7) SR 0028, Resurface, along SR 0028
21from Hawthorne Borough to the
22Jefferson County Line, Hawthorne
23Borough, Redbank Township, Project ID
2492623

 

25Project Allocation

2,200,000

26(Base Project Allocation - $2,200,000)

 

27(8) SR 2005, Railroad Fill-In, Existing
28Structure Carrying SR 2005, (Olean
29Trail Road) over the Conrail Railroad,
30Limestone Township, Project ID 92622

 

1Project Allocation

1,582,000

2(Base Project Allocation - $1,467,000)

 

3(Land Allocation - $70,000)

 

4(Design & Contingencies - $45,000)

 

5(9) SR 0036, Resurface, Along PA 36 from
6PA 66 to PA 208, Farmington and
7Washington Townships, Project ID 91309

 

8Project Allocation

330,000

9(Base Project Allocation - $330,000)

 

10(10) SR 3020, Rehabilitation, Resurface,
11SR 3020 (Master Road) and SR 2007
12(Huckleberry Ridge Road) over I-80,
13Beaver and Richland Townships, Project
14ID 97016

 

15Project Allocation

143,000

16(Base Project Allocation - $143,000)

 

17(11) SR 0338, Resurface, Along SR 0338
18from SR 3007 (Canoe Ripple Road) to
19Knox Borough, Beaver Township, Knox
20Borough, Project ID 91307

 

21Project Allocation

305,000

22(Base Project Allocation - $305,000)

 

23(12) SR 1005, Highway Reconstruction, SR
241005, Farmington and Highland
25Townships, Clarion Borough, Project ID
2691861

 

27Project Allocation

900,000

28(Base Project Allocation - $900,000)

 

29(13) SR 1015, Resurface, Along SR 1015
30(Forest Road) from PA 36 to PA 66,

 

1Farmington Township, Project ID 91859

 

2Project Allocation

300,000

3(Base Project Allocation - $300,000)

 

4(14) SR 0028, Highway Reconstruction, SR
50028, Redbank Township, Hawthorne and
6New Bethlehem Boroughs, Project ID
791886

 

8Project Allocation

1,130,000

9(Base Project Allocation - $1,130,000)

 

10(15) SR 0368, Highway Reconstruction, SR
110368, Licking and Perry Townships,
12Callensburg Borough, Project ID 91870

 

13Project Allocation

500,000

14(Base Project Allocation - $500,000)

 

15(16) SR 0058, Highway Reconstruction, SR
160058, Licking and Richland Townships,
17Foxburg, Saint Petersburg and Sligo
18Boroughs, Project ID 91866

 

19Project Allocation

950,000

20(Base Project Allocation - $950,000)

 

21(17) I-80, Highway Reconstruction, I-80
22from SR 0338 to the Allegheny County
23Line, Allegheny, Beaver and Richland
24Townships, Project ID 91913

 

25Project Allocation

2,093,000

26(Base Project Allocation - $2,000,000)

 

27(Design & Contingencies - $93,000)

 

28(18) SR 2001, Highway Reconstruction, SR
292001, Segments 0100 through 0250,
30Limestone and Redbank Townships,

 

1Project ID 91873

 

2Project Allocation

600,000

3(Base Project Allocation - $600,000)

 

4(19) I-80, Highway Reconstruction, I-80
5from SR 0338 to the PA 68 Interchange,
6Beaver, Clarion, Monroe and Paint
7Townships, Project ID 91912

 

8Project Allocation

1,890,000

9(Base Project Allocation - $1,800,000)

 

10(Design & Contingencies - $90,000)

 

11(20) SR I-80, Highway Reconstruction, I-
1280 from the 68 Interchange to the
13Union Township Line, Clarion,
14Limestone and Monroe Townships,
15Project ID 91911

 

16Project Allocation

2,290,000

17(Base Project Allocation - $2,200,000)

 

18(Design & Contingencies - $90,000)

 

19(21) SR 0322, Highway Reconstruction, SR
200322, Ashland, Clarion, Elk and Paint
21Townships, Clarion, Shippensville and
22Strattanville Boroughs, Project ID
2391887

 

24Project Allocation

2,330,000

25(Base Project Allocation - $2,330,000)

 

26(22) SR 0861, Highway Reconstruction, SR
270861, Madison, Porter and Toby
28Townships, New Bethlehem and
29Rimersburg Boroughs, Project ID 91879

 

30Project Allocation

1,000,000

1(Base Project Allocation - $1,000,000)

 

2(23) SR 0068, Highway Reconstruction, SR
30068, Brady, Clarion, Madison, Monroe,
4Piney and Toby Townships, Clarion,
5East Brady, Rimersburg and Sligo
6Boroughs, Project ID 91882

 

7Project Allocation

2,470,000

8(Base Project Allocation - $2,470,000)

 

9(24) SR 0068, Safety Improvement, Along
10PA 68 from Trout Run to Boundary
11Street, Clarion Borough, Clarion
12Township, Project ID 88927

 

13Project Allocation

1,311,000

14(Base Project Allocation - $1,013,000)

 

15(Land Allocation - $206,000)

 

16(Design & Contingencies - $92,000)

 

17(25) SR 0066, Highway Reconstruction, SR
180066, Clarion, Farmington, Knox,
19Limestone, Paint, Porter and Redbank
20Townships, New Bethlehem Borough,
21Project ID 91885

 

22Project Allocation

3,480,000

23(Base Project Allocation - $3,480,000)

 

24(26) SR 0068, Safety Improvement, PA 68
25and SR 2009 (Cherry Run
26Street/Lawsonham Street) Intersection,
27Rimersburg Borough, Project ID 99285

 

28Project Allocation

310,000

29(Base Project Allocation - $310,000)

 

30(27) SR 0322, Resurface, US 322 from 0.23

 

1Mile West of T-720 (Maple Drive) to
20.03 Mile West of Sheridan Drive,
3Clarion Borough, Paint Township,
4Project ID 100183

 

5Project Allocation

2,400,000

6(Base Project Allocation - $2,400,000)

 

7(28) SR 0208, Safety Improvement, SR 0208
8Intersection with Main Street, Knox
9Borough, Project ID 99276

 

10Project Allocation

310,000

11(Base Project Allocation - $310,000)

 

12(29) I-80, Reconstruction, I-80 from the
13Butler County Line to the Jefferson
14County Line, Various Municipalities,
15Project ID 0

 

16Project Allocation

112,400,000

17(Base Project Allocation -
18$112,400,000)

 

19(30) SR 0038, Resurface, SR 0038 County
20Line to County Line, Various
21Municipalities, Project ID 102367

 

22Project Allocation

1,700,000

23(Base Project Allocation - $1,700,000)

 

24Section 317. Clearfield County.

25Projects are as follows:

 

26(1) (Reserved).

 

27(2) SR 0322, Resurface, SR 0322 Segment
280414/0000 to 0510/0000, Bradford
29Township, Clearfield Borough, Lawrence
30Township, Project ID 96253

 

1Project Allocation

640,000

2(Base Project Allocation - $480,000)

 

3(Land Allocation - $40,000)

 

4(Design & Contingencies - $120,000)

 

5(3) SR 0219, Safety Improvements, SR 0219
6from Irishtown Road to I-80, Exit 97,
7City of Dubois, Bloom, Union, Brady
8and Sandy Townships, Project ID 95836

 

9Project Allocation

1,850,000

10(Base Project Allocation - $1,500,000)

 

11(Land Allocation - $50,000)

 

12(Design & Contingencies - $300,000)

 

13(4) SR 1011, Resurface, SR 1011,
14Kylertown to Karthaus, Segment
150010/0000 to 0200/0000, Cooper,
16Covington and Karthaus Townships,
17Project ID 96254

 

18Project Allocation

652,000

19(Base Project Allocation - $601,000)

 

20(Design & Contingencies - $51,000)

 

21(5) SR 0219, Highway Portion Bridge
22Replacement, SR 0219 over Whiskey Run
23BMS 17-0219-0280-0000, Bell Township,
24Project ID 91508

 

25Project Allocation

2,245,000

26(Base Project Allocation - $1,458,000)

 

27(Land Allocation - $148,000)

 

28(Design & Contingencies - $639,000)

 

29(6) SR 0322, Resurface, SR 0322, Barretts
30Curve to Mineral Springs Segment

 

10510/0000 to 0550/0805, Bradford
2Township, Project ID 96258

 

3Project Allocation

149,000

4(Base Project Allocation - $149,000)

 

5(7) SR 4013, Highway Restoration, Allport
6Cutoff, SR 2030, Bradford, Graham and
7Morris Townships, Project ID 88296

 

8Project Allocation

1,100,000

9(Base Project Allocation - $1,100,000)

 

10(8) SR 0022, Highway Restoration, SR
110219, Indiana County Line to Sawmill
12Run Road, Burnside Township, Project
13ID 88300

 

14Project Allocation

650,000

15(Base Project Allocation - $650,000)

 

16(9) SR 0022, Highway Restoration, SR 0219
17Bell Run to Grampian, Greenwood and
18Penn Townships, Grampian Borough,
19Project ID 88301

 

20Project Allocation

400,000

21(Base Project Allocation - $400,000)

 

22(10) SR 0153, Highway Betterment Project,
23SR 0153 – Johnson's Nursery toward
24Penfield Segment 530/2201 to 630/1110,
25Huston and Pine Townships, Project ID
2688302

 

27Project Allocation

2,892,000

28(Base Project Allocation - $2,194,000)

 

29(Land Allocation - $33,000)

 

30(Design & Contingencies - $665,000)

 

1(11) SR 4104, Highway Reconstruction, SR
24014 from SR 4017 to US 322, Brady,
3Sandy and Union Townships, Project ID
491237

 

5Project Allocation

4,285,000

6(Base Project Allocation - $4,285,000)

 

7(12) SR 0022, Highway Restoration, SR
82024 Old Erie Pike (SR 0322 to SR
90153), Boggs and Decatur Townships,
10Project ID 88304

 

11Project Allocation

900,000

12(Base Project Allocation - $900,000)

 

13(13) SR 0053, SR 0153, SR 0322, Guiderail
14Improvements, SR 0053, Segments 0110
15through 0170, SR 0153, Segment 0530,
16SR 0322, Segments 0440 through 0690,
17Various Municipalities, Project ID
1889248

 

19Project Allocation

750,000

20(Base Project Allocation - $750,000)

 

21(14) SR 0053, Intersection
22Improvements,SR 0053/0253
23Intersection, Houtzdale Borough,
24Woodward Township, Project ID 96067

 

25Project Allocation

563,000

26(Base Project Allocation - $401,000)

 

27(Land Allocation - $41,000)

 

28(Design & Contingencies - $121,000)

 

29(15) SR 0453, Resurface, SR 0453 from SR
303007 to SR 2015, Segment 0200/0000 to

 

10240/0000, Bigler and Knox Townships,
2Project ID 96260

 

3Project Allocation

200,000

4(Base Project Allocation - $200,000)

 

5(16) SR 1011, Highway Portion Bridge
6Replacement, SR 1011 over West Branch
7Susquehanna River, Segment 0120/3222,
8North of Kylertown, Cooper and
9Covington Townships, Project ID 91174

 

10Project Allocation

1,760,000

11(Base Project Allocation - $1,760,000)

 

12(17) SR 2030, Highway Betterment, SR
132030, Segments 0050 to 0150/0179 from
14US 322 West through Allport Cutoff
15Road, Bradford, Graham and Morris
16Townships, Project ID 91103

 

17Project Allocation

4,000,000

18(Base Project Allocation - $4,000,000)

 

19(18) SR 0322, Safety Improvements, SR
200322 from Turnpike Avenue to Baughman
21Road, Clearfield Borough, Bradford and
22Lawrence Township, Project ID 95840

 

23Project Allocation

1,850,000

24(Base Project Allocation - $1,500,000)

 

25(Land Allocation - $50,000)

 

26(Design & Contingencies - $300,000)

 

27(19) SR 1001, Safety Improvements, SR
284019, Segment 0030 Offset 2674 to
290040/0500, City of Dubois, Project ID
3088232

 

1Project Allocation

400,000

2(Base Project Allocation - $100,000)

 

3(Land Allocation - $100,000)

 

4(Design & Contingencies - $200,000)

 

5(20) SR 0879, Highway Portion Bridge
6Replacement, SR 0879 over Railroad and
7the West Branch Susquehanna River,
8Lawrence Township, Project ID 3659

 

9Project Allocation

10,935,000

10(Base Project Allocation -
11$10,226,000)

 

12(Land Allocation - $99,000)

 

13(Design & Contingencies - $610,000)

 

14(21) SR 0322, Intersection Improvements,
15South of Dubois, SR 0322 and SR 0119
16Intersection, Sandy Township, Project
17ID 50985

 

18Project Allocation

514,000

19(Base Project Allocation - $514,000)

 

20(22) SR 0036, Highway Portion Bridge
21Replacement, SR 0036 over North Camp
22Run, Chest Township, Project ID 71990

 

23Project Allocation

443,000

24(Base Project Allocation - $177,000)

 

25(Design & Contingencies - $266,000)

 

26(23) SR 0153, Safety Improvement, SR 0153
27at Lauren Run Road, Huston Township,
28Project ID 91945

 

29Project Allocation

300,000

30(Base Project Allocation - $200,000)

 

1(Design & Contingencies - $100,000)

 

2(24) SR 0053, Safety Improvement, SR 0053
3from Lil Troy Drive to Hawk Run
4Intersection, Morris Township, Project
5ID 91949

 

6Project Allocation

300,000

7(Base Project Allocation - $200,000)

 

8(Design & Contingencies - $100,000)

 

9(25) SR 0322, Safety Improvement, SR
100322, Segments 0770 to 0770/1254,
11Decatur Township, Project ID 91950

 

12Project Allocation

300,000

13(Base Project Allocation - $200,000)

 

14(Design & Contingencies - $100,000)

 

15(26) SR 0879, Highway Reconstruction, SR
160879 from Lick Run Bridge to the
17Village of Shawville, Goshen Township,
18Project ID 91965

 

19Project Allocation

600,000

20(Base Project Allocation - $400,000)

 

21(Design & Contingencies - $200,000)

 

22(27) SR 0255, Highway Reconstruction, SR
230255, Sabula Road, Segments 0070
24through 0230, Huston and Sandy
25Townships, Project ID 91966

 

26Project Allocation

600,000

27(Base Project Allocation - $400,000)

 

28(Design & Contingencies - $200,000)

 

29(28) SR 0080, Culvert Rehabilitation, I-
3080, 7 Locations, Bradford, Cooper and

 

1Graham Townships, Project ID 87694

 

2Project Allocation

1,056,000

3(Base Project Allocation - $621,000)

 

4(Design & Contingencies - $435,000)

 

5(29) SR 0080, Highway Portion Bridge
6Replacement Project, I-80 over SR 0970
7Eastbound and Westbound, Bradford
8Township, Project ID 87729

 

9Project Allocation

2,245,000

10(Base Project Allocation - $2,158,000)

 

11(Design & Contingencies - $87,000)

 

12(30) SR 0255, Highway Reconstruction, SR
130255, Segments 0050/2500 through 0080,
14Sandy Township, Project ID 88219

 

15Project Allocation

2,688,000

16(Base Project Allocation - $1,363,000)

 

17(Land Allocation - $825,000)

 

18(Design & Contingencies - $500,000)

 

19(31) SR 4019, Safety Improvements, SR
201053, Segments 0150/0000 to 0580/0000,
21Pine and Huston Townships, Project ID
2288215

 

23Project Allocation

400,000

24(Base Project Allocation - $100,000)

 

25(Land Allocation - $100,000)

 

26(Design & Contingencies - $200,000)

 

27(32) SR 3007, Resurface, SR 3007 from
28Glen Richey to PA 453, Segments
290180/2882 to 0240/1849, Lawrence and
30Pike Townships, Project ID 96261

 

1Project Allocation

220,000

2(Base Project Allocation - $220,000)

 

3(33) SR 0219, Turning Lane and Signal
4Upgrades, Routes 219 and 879, Grampian
5Borough, Penn Township, Project ID
692695

 

7Project Allocation

1,001,000

8(Base Project Allocation - $1,001,000)

 

9(34) SR 0066, Safety Improvements, SR
100219, Segment 0880 Offset 0300 to
110880/1300, City of Dubois, Project ID
1288226

 

13Project Allocation

350,000

14(Base Project Allocation - $100,000)

 

15(Land Allocation - $50,000)

 

16(Design & Contingencies - $200,000)

 

17(35) SR 0255, Safety Improvements, SR
184017, Segment 0010 Offset 1093 to
190020/2166, Sandy Township, Project ID
2088230

 

21Project Allocation

400,000

22(Base Project Allocation - $100,000)

 

23(Land Allocation - $100,000)

 

24(Design & Contingencies - $200,000)

 

25(36) SR 0219, Highway Reconstruction, SR
260219, Grampian Borough to Chestnut
27Grove, Grampian Borough, Penn and
28Bloom Townships, Project ID 92719

 

29Project Allocation

1,250,000

30(Base Project Allocation - $1,250,000)

 

1(37) SR 0219, Highway Reconstruction, SR
20219 from Clearfield County Line
3through Grampian Borough, Burnside
4Township, Burnside Borough, Bell
5Township, Mahaffey Borough, Greenwood
6and Penn Townships, Grampian Borough,
7Project ID 92731

 

8Project Allocation

1,000,000

9(Base Project Allocation - $1,000,000)

 

10(38) SR 0879, Highway Reconstruction, SR
110879 from Lecontes Mills to Quehanna
12Highway, Girard, Covington and
13Karthaus Townships, Project ID 92742

 

14Project Allocation

1,000,000

15(Base Project Allocation - $1,000,000)

 

16(39) SR 3016, Resurface, SR 3016, Cherry
17Corner Road to PA 729, Segments
180190/0000 to 0250/2134, Ferguson
19Township, Project ID 96272

 

20Project Allocation

219,000

21(Base Project Allocation - $170,000)

 

22(Design & Contingencies - $49,000)

 

23(40) SR 0153, Resurface, SR 0153,
24Penfield, North Segments 0630/1383 to
250740/1232, Huston Township, Project ID
2696271

 

27Project Allocation

5,202,000

28(Base Project Allocation - $5,001,000)

 

29(Design & Contingencies - $201,000)

 

30(41) SR 0322, Highway Portion Bridge

 

1Rehabilitation, SR 0322 over Laurel
2Run, BMS 17-0322-0750-0890, Decatur
3Township, Project ID 88173

 

4Project Allocation

1,091,000

5(Base Project Allocation - $1,091,000)

 

6(42) SR 0322, Add Lane/Widening, SR 0322
7Phillipsburg, Segments 0730/0000 to
80770/2838, Decatur Township, Project
9ID 93329

 

10Project Allocation

1,522,000

11(Base Project Allocation - $1,257,000)

 

12(Design & Contingencies - $265,000)

 

13(43) SR 0255, Highway Portion Bridge
14Replacement, SR 0255 over Mine Cave
15In, Huston Township, Project ID 88626

 

16Project Allocation

2,366,000

17(Base Project Allocation - $1,412,000)

 

18(Land Allocation - $179,000)

 

19(Design & Contingencies - $775,000)

 

20(44) SR 4019, Resurface, SR 4019 Dubois,
21Segments 0012/0957 to 0040/1182, City
22of Dubois, Sandy Township, Project ID
2393335

 

24Project Allocation

777,000

25(Base Project Allocation - $527,000)

 

26(Design & Contingencies - $250,000)

 

27(45) SR 0036, SR 0044, Highway
28Reconstruction, Clearfield County, SR
290036, Segments 0150 through 0290,
30McKean County, SR 0044, Segments 0010

 

1through 0084, Various Municipalities
2in Clearfield and McKean Counties,
3Project ID 91079

 

4Project Allocation

2,552,000

5(Base Project Allocation - $2,552,000)

 

6(46) I-80, Highway Reconstruction, I-80,
7Segments 1190 through 1381, Bradford,
8Cooper, Graham, Rush and Lawrence
9Townships, Project ID 88579

 

10Project Allocation

500,000

11(Base Project Allocation - $500,000)

 

12(47) SR 0219, Highway Resurfacing, SR
130219 Bells Landing to Grampian,
14Segments 0450/0000 to 0540/0000,
15Grampian Borough, Greenwood and Penn
16Townships, Project ID 93337

 

17Project Allocation

1,352,000

18(Base Project Allocation - $701,000)

 

19(Land Allocation - $201,000)

 

20(Design & Contingencies - $450,000)

 

21(48) SR 2030, Restoration, SR 2030
22Allport Cutoff, Segments 0050/0000 to
230150/0179, Bradford, Graham and Morris
24Townships, Project ID 93346

 

25Project Allocation

1,385,000

26(Base Project Allocation - $1,385,000)

 

27(49) SR 0153, Congestion Improvement, SR
280153 Clearfield, Segments 0390/0000 to
290400/1619, Segments 0391/0500 to
300395/0500, Clearfield Borough,

 

1Lawrence Township, Project ID 93330

 

2Project Allocation

1,476,000

3(Base Project Allocation - $1,476,000)

 

4(50) SR 4014, Highway Resurfacing, SR
54014, Segments 0010/0000 to
60130/3344/, City of Dubois, Sandy
7Township, Project ID 93336

 

8Project Allocation

1,801,000

9(Base Project Allocation - $1,050,000)

 

10(Land Allocation - $251,000)

 

11(Design & Contingencies - $500,000)

 

12(51) SR 1006, Highway Portion Bridge
13Replacement, SR 1006 over Lick Run,
14Segment 0090/1288, Near Clearfield,
15Goshen Township, Project ID 93939

 

16Project Allocation

267,000

17(Base Project Allocation - $107,000)

 

18(Design & Contingencies - $160,000)

 

19(52) SR 0322, Safety Improvement, SR
200322, Segment 0590/1800 to 0630/1400,
21Bradford Township, Project ID 93675

 

22Project Allocation

348,000

23(Base Project Allocation - $299,000)

 

24(Land Allocation - $21,000)

 

25(Design & Contingencies - $28,000)

 

26(53) SR 1009, Highway Restoration,
27Various Segments on SR 1009, SR 1011,
28SR 1013, SR 2001, SR 2007, SR 2009,
29Bigler, Boggs, Covington, Graham,
30Gulich, Karthaus and Lawrence

 

1Townships, Project ID 91087

 

2Project Allocation

1,918,000

3(Base Project Allocation - $1,918,000)

 

4(54) SR 0053, Highway Reconstruction, SR
51010, SR 2009, SR 2016, SR 2023, SR
63007, SR 3014, SR 3016, SR 4006, SR
74009, Bigler, Bradford, Brady,
8Burnside, Decatur, Lawrence and Pike
9Townships, Project ID 91088

 

10Project Allocation

5,827,000

11(Base Project Allocation - $5,827,000)

 

12(55) SR 0255, Highway Resurfacing, SR
130255, Sabula to Winterburn, Segments
140100/0000 to 0210/0000, Huston and
15Sandy Townships, Project ID 93338

 

16Project Allocation

1,401,000

17(Base Project Allocation - $750,000)

 

18(Land Allocation - $201,000)

 

19(Design & Contingencies - $450,000)

 

20(56) SR 0322, Resurface, SR 0322,
21Luthersburg to Rockton, Segment
220070/0000 to 0150/0000, Brady and
23Union Townships, Project ID 93342

 

24Project Allocation

796,000

25(Base Project Allocation - $546,000)

 

26(Design & Contingencies - $250,000)

 

27(57) SR 0879, Highway Resurfacing, SR
280879 from Truck Stop to Shawville,
29Segments 0350/0000 to 0440/0000,
30Goshen and Lawrence Townships, Project

 

1ID 93339

 

2Project Allocation

2,050,000

3(Base Project Allocation - $1,500,000)

 

4(Land Allocation - $400,000)

 

5(Design & Contingencies - $150,000)

 

6(58) SR 0255, Highway Resurfacing, SR
70255 from Penfield to County Line,
8Segments 0260/0000 to 0330/1763,
9Huston Township, Project ID 93340

 

10Project Allocation

1,121,000

11(Base Project Allocation - $620,000)

 

12(Land Allocation - $101,000)

 

13(Design & Contingencies - $400,000)

 

14(59) SR 0153, Highway Resurfacing, SR
150153 from Sullivan Hill to Penfield,
16Segments 0550/0000 to 0630/0000,
17Huston Township, Project ID 93341

 

18Project Allocation

1,101,000

19(Base Project Allocation - $600,000)

 

20(Land Allocation - $101,000)

 

21(Design & Contingencies - $400,000)

 

22(60) SR 0219, Resurface, US 219 from
23Falls Creek to Sandy Township,
24Segments, 0911/0000 to 0941/1399,
25Sandy Township, Project ID 101030

 

26Project Allocation

1,000,000

27(Base Project Allocation - $1,000,000)

 

28(61) SR I-80, Reconstruction, I-80 from
29the Jefferson County Line to the
30Centre County Line, Various

 

1Municipalities, Project ID 0

 

2Project Allocation

167,200,000

3(Base Project Allocation -
4$167,200,000)

 

5(62) SR 0153, Resurface, PA 153 from
6Clover Hill Road to Clearfield,
7Segments 0330/2134 to 0380/0000,
8Clearfield Borough, Lawrence Township,
9Project ID 100552

 

10Project Allocation

575,000

11(Base Project Allocation - $575,000)

 

12(63) SR 0219, Resurface, US 219 from
13Dubois Street to Jefferson County
14Line, Segments 0892/0000 to 0960/2562,
15City of Dubois, Sandy Township,
16Project ID 101023

 

17Project Allocation

2,132,000

18(Base Project Allocation - $2,132,000)

 

19(64) SR 0879, Resurface, PA 879 from
20Grampian to Arnoldtown Road, Segments
210010/0000 to 0140/0000, Curwensville
22and Grampian Boroughs, Penn and Pike
23Townships, Project ID 100591

 

24Project Allocation

2,400,000

25(Base Project Allocation - $2,400,000)

 

26(65) SR 3001, Betterment, Restoration, SR
273000 Quad Routes, Various, Project ID
28101935

 

29Project Allocation

62,972,000

30(Base Project Allocation -

 

1$62,821,000)

 

2(Design & Contingencies - $151,000)

 

3(66) SR 4001, Betterment, Restoration, SR
44000 Quad Routes, Brady Township, City
5of Dubois, Huston, Pine and Sandy
6Townships, Troutville Borough, Union
7Township, Project ID 101936

 

8Project Allocation

11,056,000

9(Base Project Allocation -
10$10,905,000)

 

11(Design & Contingencies - $151,000)

 

12(67) SR 0879, Resurface, PA 879 from
13Lecontes Mills to Keewaydin, Segments
140580/0000 to 0730/0000, Covington and
15Girard Townships, Project ID 101005

 

16Project Allocation

2,700,000

17(Base Project Allocation - $2,700,000)

 

18(68) SR 0219, Resurface, US 219 from
19Grampian to Chestnut Grove, Segments
200540/0000 to 0640/0000, Bloom
21Township, Grampian Borough, Penn
22Township, Project ID 101001

 

23Project Allocation

1,409,000

24(Base Project Allocation - $1,409,000)

 

25(69) SR 0453, Resurface, PA 453 from PA
26253 to PA 53, Segments 0070/0000 to
270150/0000, Bigler Township, Ramey
28Borough, Project ID 100585

 

29Project Allocation

1,750,000

30(Base Project Allocation - $1,750,000)

 

1(70) SR 0053, Resurface, PA 53 from
2Philipsburg to Kylertown, Segments
30590/0000 to 0770/0000, Cooper,
4Decatur and Morris Townships, Project
5ID 10053

 

6Project Allocation

3,375,000

7(Base Project Allocation - $3,375,000)

 

8(71) SR 0253, Resurface, PA 253 from
9Ramey to Houtzdale, Segments 0140/0000
10to 0210/1425, Gulich Township,
11Houtzdale and Ramey Boroughs, Woodward
12Township, Project ID 100581

 

13Project Allocation

1,350,000

14(Base Project Allocation - $1,350,000)

 

15(72) SR 0253, Resurface, PA 253 from
16Janesville to Ramey, Segments
170060/0000 to 0140/0000, Gulich
18Township, Ramey Borough, Project ID
19100579

 

20Project Allocation

1,379,000

21(Base Project Allocation - $1,379,000)

 

22(73) SR 0053, Resurface, PA 53 from
23Irvona to Osceola Mills, Segments
240110/0000 to 0500/0000, Beccaria,
25Bigler and Decatur Townships, Glen
26Hope, Houtzdale and Osceola Mills
27Boroughs, Woodward Township, Project
28ID 100573

 

29Project Allocation

7,080,000

30(Base Project Allocation - $7,080,000)

 

1(74) SR 1011, Resurface, SR 1011 from
2Karthaus to Cameron County Line,
3Segments 0200/0000 to 0340/2585,
4Covington and Karthaus Townships,
5Project ID 101011

 

6Project Allocation

3,300,000

7(Base Project Allocation - $3,300,000)

 

8(75) SR 0219, Betterment, Restoration, US
9219, City of Dubois, Sandy Township,
10Project ID 101762

 

11Project Allocation

681,000

12(Base Project Allocation - $530,000)

 

13(Design & Contingencies - $151,000)

 

14(76) SR 0879, Resurface, PA 879 from
15Clearfield to I-80, Segments 0220/0000
16to 0350/0000. Clearfield Borough,
17Lawrence Township, Project ID 101143

 

18Project Allocation

2,300,000

19(Base Project Allocation - $2,300,000)

 

20(77) SR 0879, Resurface, PA 879,
21Clearfield Bypass, Segments 0221/0000
22to 0271/1202, Clearfield Borough,
23Lawrence Township, Project ID 101149

 

24Project Allocation

1,000,000

25(Base Project Allocation - $1,000,000)

 

26(78) SR 0879, Resurface, PA 879 from
27Shawville to Bald Hill, Segment
280450/0000 to 540/0000, Girard and
29Goshen Townships, Project ID 101160

 

30Project Allocation

2,003,000

1(Base Project Allocation - $2,003,000)

 

2(79) SR 0729, Resurface, PA 729 from PA
3969 to US 219, Segments 0410/0000 to
40490/3553, Ferguson Township, Grampian
5Borough, Penn Township, Project ID
6100547

 

7Project Allocation

1,450,000

8(Base Project Allocation - $1,450,000)

 

9(80) SR 0219, Resurface, US 219 from
10Luthersburg to City of Dubois,
11Segments 0640/0000 to 0850/0399,
12Bloom, Brady, Sandy and Union
13Townships, Project ID 101286

 

14Project Allocation

7,000,000

15(Base Project Allocation - $7,000,000)

 

16(81) SR 0322, Resurface, US 322 Woodland
17Road from Turner Road to Blue Ball,
18Segments 0060/0000 to 0730/2382,
19Boggs, Bradford and Decatur Townships,
20Wallaceton Borough, Project ID 101297

 

21Project Allocation

4,000,000

22(Base Project Allocation - $4,000,000)

 

23(82) SR 0322, Resurface, US 322 from 
24Barretts Curve (SR 1010) to Mineral
25Springs (SR 2030), Segments, 0510/0000
26to 0550/0805, Bradford Township,
27Project ID 101265

 

28Project Allocation

745,000

29(Base Project Allocation - $745,000)

 

30(83) SR 0322, Betterment, Restoration, US

 

1322, Bradford, Brady, Pine, Sandy and
2Union Townships, Project ID 101775

 

3Project Allocation

5,556,000

4(Base Project Allocation -
5$5,406,,000)

 

6(Design & Contingencies - $150,000)

 

7(84) SR 0119, Resurface, US 119 from
8Jefferson County Line to US 219,
9Segments 0010/0000 to 0070/1799, Brady
10and Sandy Townships, Project ID 101269

 

11Project Allocation

2,000,000

12(Base Project Allocation - $2,000,000)

 

13(85) SR 0879, Betterment, Restoration, PA
14879, Curwensville Borough, Girard,
15Goshen, Lawrence and Pike Townships,
16Project ID 101707

 

17Project Allocation

2,495,000

18(Base Project Allocation - $2,345,000)

 

19(Design & Contingencies - $150,000)

 

20(86) SR 0865, Betterment, Restoration, PA
21865, Beccaria Township, Coalport
22Borough, Project ID 101706

 

23Project Allocation

2,640,000

24(Base Project Allocation - $2,490,000)

 

25(Design & Contingencies - $150,000)

 

26(87) SR 0453, Betterment, Restoration, PA
27453, Curwensville Borough, Knox and
28Pike Townships, Project ID 101705

 

29Project Allocation

4,516,000

30(Base Project Allocation - $4,366,000)

 

1(Design & Contingencies - $150,000)

 

2(88) SR 0410, Betterment, Restoration, PA
3410, Brady Township, Troutville
4Borough, Project ID 101704

 

5Project Allocation

911,000

6(Base Project Allocation - $760,000)

 

7(Design & Contingencies - $151,000)

 

8(89) SR 0153, Betterment, Restoration, PA
9153, Brisbin Borough, Gulich Township,
10Houtzdale Borough, Pine and Woodward
11Townships, Project ID 101685

 

12Project Allocation

6,070,000

13(Base Project Allocation - $5,920,000)

 

14(Design & Contingencies - $150,000)

 

15(90) SR 0053, Betterment, Restoration, PA
1653, Bigler Township, Chester Hill
17Borough, Cooper and Decatur Townships,
18Houtzdale and Osceola Mills Boroughs,
19Woodward Township, Project ID 101682

 

20Project Allocation

7,440,000

21(Base Project Allocation - $7,290,000)

 

22(Design & Contingencies - $150,000)

 

23(91) SR 0153, Resurface, PA 153, Crooked
24Sewer Highway North to Glen Richey
25Highway, Segments 0210/0000 to
260330/3878, Boggs and Lawrence
27Townships, Project ID 101310

 

28Project Allocation

4,300,000

29(Base Project Allocation - $4,300,000)

 

30(92) SR 0513, Resurface, PA 153 from

 

1Brisbin (SR 2007) to West of SR 2024,
2Segments 0054/0000 to 0210/1000, Boggs
3Township, Brisbin Borough, Decatur and
4Woodward Townships, Project ID 101091

 

5Project Allocation

4,199,000

6(Base Project Allocation - $4,199,000)

 

7(93) SR 0036, Resurface, PA 36 from
8Cambria County Line to Bouch Road,
9Segments 0010/0000 to 0340/0000, Bell
10and Chest Townships, Mahaffey, Newburg
11and Westover Boroughs, Project ID
12100535

 

13Project Allocation

5,086,000

14(Base Project Allocation - $5,086,000)

 

15(94) SR 1001, Betterment, SR: 1001, 1002,
161003, 1004, 1006, 1008, 1009, 1012,
171013, 1014, 1015, 1016, 1018, 1020,
181022, 1050, Bradford Township,
19Clearfield Borough, Cooper, Covington,
20Girard, Goshen, Graham, Karthaus,
21Lawrence, Morris and Pike Townships,
22Project ID 101918

 

23Project Allocation

22,227,000

24(Base Project Allocation -
25$22,076,000)

 

26(Design & Contingencies - $151,000)

 

27(95) SR 2001, Betterment, Restoration,
282000 Quad Routes, Various, Project ID
29101921

 

30Project Allocation

69,531,000

1(Base Project Allocation -
2$69,380,000)

 

3(Design & Contingencies - $151,000)

 

4(96) SR 1012, Resurface, SR 2012 from New
5Millport (SR 3007) to SR 2023,
6Segments 0070/0000 to 0150/0000,
7Bradford Township, Project ID 100542

 

8Project Allocation

1,600,000

9(Base Project Allocation - $1,600,000)

 

10(97) SR 0219, Resurface, US 219 from
11Burnside to Mahaffey, Segment
120120/0000 to 0290/0000, Bell Township,
13Burnside Borough, Burnside Township,
14Project ID 101092

 

15Project Allocation

3,500,000

16(Base Project Allocation - $3,500,000)

 

17(98) SR 0729, Resurface, PA 729 from
18Janesville to PA 969, Segments
190010/0000 to 0410/0000, Beccaria and
20Ferguson Townships, Glen Hope Borough,
21Gulich, Jordan Townships, Project ID
22101059

 

23Project Allocation

5,606,000

24(Base Project Allocation - $5,606,000)

 

25(99) SR 0453, Resurface, PA 453 from
26Blair County Line to PA 253, Segments
270010/0000 to 0070/0000, Gulich
28Township, Ramey Borough, Project ID
29101053

 

30Project Allocation

1,400,000

1(Base Project Allocation - $1,400,000)

 

2(100) SR 0253, Resurface, PA 253 from
3Allemans to Janesville, Segments
40010/0000 to 0060/0000, Gulich
5Township, Project ID 101048

 

6Project Allocation

1,200,000

7(Base Project Allocation - $1,200,000)

 

8(101) SR 0255, Resurface, PA 255,
9Segments 0210/0000 to 0260/2521,
10Huston Township, Project ID 101137

 

11Project Allocation

1,200,000

12(Base Project Allocation - $1,200,000)

 

13(102) SR 0969, Resurface, PA 969 from US
14219 to PA 453, Segments 0010/0000 to
150220/1165, Curwensville Borough,
16Ferguson, Greenwood, Penn and Pike
17Townships, Project ID 100544

 

18Project Allocation

3,756,000

19(Base Project Allocation - $3,756,000)

 

20(103) Various, Highway Portion Bridge
21Rehabilitation, Various State Routes,
22Various Municipalities, Project ID
233439

 

24Project Allocation

579,000

25(Base Project Allocation - $310,000)

 

26(Land Allocation - $22,000)

 

27(Design & Contingencies - $247,000)

 

28(104) Various, Highway Restoration,
29Various Segments of Clearfield County,
30SR 1011, Elk County SR 0120, SR 0255,

 

1SR 0555, Potter County SR 4014,
2Various Municipalities in Clearfield,
3Elk, McKean and Potter Counties,
4Project ID 91094

 

5Project Allocation

2,193,000

6(Base Project Allocation - $2,193,000)

 

7(105) Various, Highway Restoration,
8Various Segments of Cameron County SR
90120, Clearfield County SR 0036, SR
100053, SR 0219, Elk County SR 0219,
11McKean County SR 0006, SR 0046, SR
120219, Potter County SR 0006, Various
13Municipalities in Clearfield, Cameron,
14Elk, McKean and Potter Counties,
15Project ID 90254

 

16Project Allocation

6,776,000

17(Base Project Allocation - $6,776,000)

 

18(106) Various, Highway Reconstruction,
19Various Segments, Cameron County SR
200120, Clearfield County SR 0219, SR
210286, SR 0879, Elk County SR 0948,
22McKean County SR 0006, Potter County
23on SR 0006, SR 0044, SR 0244, Various
24Municipalities, Project ID 90255

 

25Project Allocation

3,459,000

26(Base Project Allocation - $3,459,000)

 

27(107) Various, Highway Reconstruction,
28Various Segments of SR 0153, SR 0322,
29SR 1011, SR 2027, SR 4005, SR 4007, SR
304008, SR 4009, SR 4010, Various

 

1Municipalities, Project ID 91077

 

2Project Allocation

5,832,000

3(Base Project Allocation - $5,832,000)

 

4Section 318. Clinton County.

5Projects are as follows:

 

6(1) (Reserved).

 

7(2) SR 0105, Safety Improvements, SR 0150
8Corridor, Segments/Offset 0220/0000 to
90250/0758, 9 Locations, City of
10Lockhaven, Project ID 93343

 

11Project Allocation

4,761,000

12(Base Project Allocation - $3,800,000)

 

13(Land Allocation - $336,000)

 

14(Design & Contingencies - $625,000)

 

15(3) SR 0066, Highway Restoration, SR
160880, Segments 0160/0000 to 0190/0132,
17Greene Township, Loganton Borough,
18Project ID 88306

 

19Project Allocation

350,000

20(Base Project Allocation - $250,000)

 

21(Design & Contingencies - $100,000)

 

22(4) SR 0022, Highway Restoration, SR 0120
23Hill Street to Fairview Street, City
24of Lock Haven, Castanea Township,
25Project ID 88305

 

26Project Allocation

350,000

27(Base Project Allocation - $350,000)

 

28(5) SR 0120, Highway Reconstruction, SR
290120, Segments 1061 to 1081/1346,
30Castanea Township, City of Lock Haven,

 

1Project ID 91968

 

2Project Allocation

400,000

3(Base Project Allocation - $200,000)

 

4(Design & Contingencies - $200,000)

 

5(6) SR 0120, Highway Reconstruction, SR
60120, Segments 1000/1222 to 1080/1337,
7Castanea Township, City of Lock Haven,
8Project ID 91967

 

9Project Allocation

600,000

10(Base Project Allocation - $400,000)

 

11(Design & Contingencies - $200,000)

 

12(7) SR 0080, Roadway Restoration, I-80
13Eastbound and Westbound Milepost 1700
14to 1844, Eastbound Milepost 1930 to
151944, Greene, Lamar, Logan and Porter
16Townships, Project ID 87711

 

17Project Allocation

1,601,000

18(Base Project Allocation - $1,501,000)

 

19(Design & Contingencies - $100,000)

 

20(8) SR 0120, Resurface, SR 0120,
21Segments/Offset 1060/0000 to
221080/1337, 1061/0000 to 1081/1346,
23Castanea Township, City of Lock Haven,
24Project ID 93310

 

25Project Allocation

382,000

26(Base Project Allocation - $300,000)

 

27(Land Allocation - $21,000)

 

28(Design & Contingencies - $61,000)

 

29(9) SR 0120, Highway Resurfacing, SR
300120, Segments/Offset 0800/1180 to

 

11060/0000, Allison, Bald Eagle,
2Castanea, Colebrook and Grugan
3Townships, City of Lock Haven, Project
4ID 93309

 

5Project Allocation

2,011,000

6(Base Project Allocation - $1,900,000)

 

7(Land Allocation - $30,000)

 

8(Design & Contingencies - $81,000)

 

9(10) SR 0150, Highway Restoration, Huston
10Street to North Flemington Street,
11Allison Township, Flemington Borough,
12City of Lock Haven, Project ID 88381

 

13Project Allocation

680,000

14(Base Project Allocation - $600,000)

 

15(Land Allocation - $20,000)

 

16(Design & Contingencies - $60,000)

 

17(11) SR 0120, Retaining Wall Repair, SR
180120 Corridor Lock Haven to Cameron
19County Line, East Keating and Noyes
20Townships, Renovo Borough, Chapman,
21Grugan, Bald Eagle, Colebrook and
22Allison Townships, City of Lock Haven,
23Project ID 88378

 

24Project Allocation

1,200,000

25(Base Project Allocation - $1,100,000)

 

26(Land Allocation - $30,000)

 

27(Design & Contingencies - $70,000)

 

28(12) SR 0064, Highway Portion Bridge
29Replacement, SR 0064 over Big Fishing
30Creek, BMS 18-0064-0020-0486, Porter

 

1Township, Project ID 93356

 

2Project Allocation

193,000

3(Base Project Allocation - $123,000)

 

4(Land Allocation - $15,000)

 

5(Design & Contingencies - $55,000)

 

6(13) SR 0220, Highway Reconstruction, SR
70220, Lock Haven Bypass, Bald Eagle,
8Castanea, Pine Creek and Wayne
9Townships, Project ID 88526

 

10Project Allocation

2,400,000

11(Base Project Allocation - $2,400,000)

 

12(14) SR 0064, Highway Portion Bridge
13Replacement, SR 0064 over Big Fishing
14Creek, BMS 18-0064-0030—0876, Porter
15Township, Project ID 89985

 

16Project Allocation

2,358,000

17(Base Project Allocation - $2,056,000)

 

18(Land Allocation - $91,000)

 

19(Design & Contingencies - $211,000)

 

20(15) SR 0105, Safety Improvements, SR
210150, Beech Creek to Avis Road,
22Various Municipalities, Project ID
2395841

 

24Project Allocation

1,850,000

25(Base Project Allocation - $1,500,000)

 

26(Land Allocation - $50,000)

 

27(Design & Contingencies - $300,000)

 

28(16) SR 0120, SR 1001, SR 1016, SR 2002,
29SR 2012, Highway Reconstruction, SR
300120 Segments 0500 through 1040, SR

 

11001 Segments 0030 through 0140, SR
21016 Segments 0010 through 0030, SR
32002 Segments 0020 through 0050, SR
42012 Segments 0024, 0034, 0040, 0120,
5Various Municipalities, Project ID
691000

 

7Project Allocation

1,540,000

8(Base Project Allocation - $1,540,000)

 

9(17) SR 3074, Safety Improvement,
10Shoulder Improvement, SR 0120 Segment
111030, 1040, 1050, City of Lock Haven,
12Project ID 88245

 

13Project Allocation

400,000

14(Base Project Allocation - $100,000)

 

15(Land Allocation - $100,000)

 

16(Design & Contingencies - $200,000)

 

17(18) SR 0150, Resurface, SR 0150, Beech
18Creek to Mill Hall, Segments 0040/0000
19to 0140/1246, Bald Eagle and Beech
20Creek Townships, Mill Hall Borough,
21Project ID 93377

 

22Project Allocation

944,000

23(Base Project Allocation - $944,000)

 

24(19) SR 0120, Highway Reconstruction, SR
250120 from Kettle Creek Road to Mills
26Run Road, Noyes Township, Project ID
2792729

 

28Project Allocation

400,000

29(Base Project Allocation - $400,000)

 

30(20) SR 0150, Safety Improvement, SR

 

10150, Segments 0010/0488 to 0020/0900,
2Beech Creek Township, Beech Creek
3Borough, Project ID 91933

 

4Project Allocation

300,000

5(Base Project Allocation - $200,000)

 

6(Design & Contingencies - $100,000)

 

7(21) SR 0064, SR 0880, Highway
8Reconstruction, SR 0064 and SR 0880,
9Lamar, Porter, Greene and Crawford
10Townships, Project ID 90996

 

11Project Allocation

870,000

12(Base Project Allocation - $870,000)

 

13(22) SR 0105, Resurface, SR 0105,
14Woolrich to McEllhattan, Segments
150310/0000 to 0360/0000, Dunnstable and
16Pine Creek Townships, Project ID 99972

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(23) SR 0120, Resurface, SR 0120, Cameron
20County Line toward Martin Lane, East
21Keating Township, Project ID 99992

 

22Project Allocation

4,850,000

23(Base Project Allocation - $4,850,000)

 

24(24) SR 0120, Resurface, SR 0120,
25Bucktail Trail Highway, Segments
260800/0000 to 0890/2102, Bald Eagle,
27Colebrook and Grugan Township, Project
28ID 99974

 

29Project Allocation

2,000,000

30(Base Project Allocation - $2,000,000)

 

1(25) SR 0880, Resurface, PA 880, SR 2007
2to Snooks Road, Greene and Logan
3Townships, Loganton Borough, Project
4ID 99991

 

5Project Allocation

2,104,000

6(Base Project Allocation - $2,104,000)

 

7(26) SR 0220, Resurface, US 220, Salona
8to Avis Southbound, Avis Borough, Bald
9Eagle, Castanea and Lamar Townships,
10Mill Hall Borough, Pine Creek and
11Wayne Townships, Project ID 99990

 

12Project Allocation

3,117,000

13(Base Project Allocation - $3,117,000)

 

14(27) SR 4005, Highway Portion Bridge
15Replacement, SR 4005 over Young Womans
16Creek, Chapman Township, Project ID
17101559

 

18Project Allocation

2,326,000

19(Base Project Allocation - $1,755,000)

 

20(Land Allocation - $132,000)

 

21(Design & Contingencies - $439,000)

 

22(28) SR 0150, Resurface, PA 150, Chatham
23Run Mill Road to Avis Interchange,
24Segments 0360/0000 to 0410/2115, Pine
25Creek Township, Project ID 99987

 

26Project Allocation

1,000,000

27(Base Project Allocation - $1,000,000)

 

28(29) I-80, Reconstruction, I-80 from the
29Clinton County Line to the Union
30County Line, Various Municipalities,

 

1Project ID 0

 

2Project Allocation

96,000,000

3(Base Project Allocation -
4$96,000,000)

 

5(30) SR 0120, Resurface, SR 0120,
6Bucktail Trail Highway, Segments
70980/0453 to 1060/0000, Allison
8Township, City of Lock Haven, Project
9ID 99985

 

10Project Allocation

8,887,000

11(Base Project Allocation - $8,656,000)

 

12(Design & Contingencies - $231,000)

 

13(31) SR 0120, Resurface, SR 0120, Farwell
14to Roadside Rest, Segments 0460/0000
15to 0660/0000, Chapman and Grugan
16Townships, Renovo Borough, Project ID
1799981

 

18Project Allocation

3,822,000

19(Base Project Allocation - $3,822,000)

 

20(32) I-80, Betterment, Restoration, I-80,
21Greene Township, Project ID 101916

 

22Project Allocation

8,231,000

23(Base Project Allocation - $8,080,000)

 

24(Design & Contingencies - $151,000)

 

25(33) SR 0220, Resurface, US 220, Salona
26to Avis Northbound, Segments 0080/0000
27to 0360/3186, Avis Borough, Bald
28Eagle, Castanea and Lamar Townships,
29Mill Hall Borough, Pine Creek and
30Wayne Townships, Project ID 99989

 

1Project Allocation

3,117,000

2(Base Project Allocation - $3,117,000)

 

3(34) SR 0477, Betterment, Restoration, PA
4477, Greene and Lamar Townships,
5Loganton Borough, Project ID 101913

 

6Project Allocation

5,602,000

7(Base Project Allocation - $5,451,000)

 

8(Design & Contingencies - $151,000)

 

9(35) SR 0664, Betterment, Restoration, PA
10664, Gallagher Township, City of Lock
11Haven, Woodward Township, Project ID
12101914

 

13Project Allocation

8,386,000

14(Base Project Allocation - $8,236,000)

 

15(Design & Contingencies - $150,000)

 

16(36) SR 0064, Betterment, Restoration, PA
1764, Bald Eagle Township, Mill Hall
18Borough, Project ID 101909

 

19Project Allocation

891,000

20(Base Project Allocation - $740,000)

 

21(Design & Contingencies - $151,000)

 

22(37) SR 0044, Betterment, Restoration, PA
2344, Gallagher, Grugan and Pine Creek
24Townships, Project ID 101908

 

25Project Allocation

541,000

26(Base Project Allocation - $390,000)

 

27(Design & Contingencies - $151,000)

 

28(38) SR 4001, Betterment, Restoration, SR
294000 Quad Routes, Chapman, East
30Keating, Leidy, Noyes and West Keating

 

1Townships, Project ID 101986

 

2Project Allocation

6,200,000

3(Base Project Allocation - $6,070,000)

 

4(Design & Contingencies - $150,000)

 

5(39) SR 2002, Betterment, Restoration, SR
62000, Quad Routes, Various
7Municipalities, Project ID 101985

 

8Project Allocation

21,371,000

9(Base Project Allocation -
10$21,221,000)

 

11(Design & Contingencies - $150,000)

 

12(40) SR 1001, Betterment, Restoration, SR
131000, Quad Routes, Various
14Municipalities, Project ID 101983

 

15Project Allocation

8,121,000

16(Base Project Allocation - $7,970,000)

 

17(Design & Contingencies - $151,000)

 

18(41) SR 0120, Resurface, SR 0120, West of
19Shintown to Renovo, Segments 0340/0000
20to 0460/0000, Noyes Township, Renovo
21Borough, Project ID 99977

 

22Project Allocation

1,920,000

23(Base Project Allocation - $1,920,000)

 

24(42) SR 0880, Betterment, Restoration, PA
25880, Crawford, Greene and Logan
26Township, Project ID 101915

 

27Project Allocation

7,356,000

28(Base Project Allocation - $7,206,000)

 

29(Design & Contingencies - $150,000)

 

30(43) SR 0150, Betterment, Restoration, PA

 

1150, Allison, Bald Eagle, Beech Creek,
2Castanea and Dunnstable Townships,
3Flemington Borough, City of Lock
4Haven, Woodward Township, Project ID
5101912

 

6Project Allocation

2,495,000

7(Base Project Allocation - $2,345,000)

 

8(Design & Contingencies - $150,000)

 

9(44) SR 0144, Betterment, Restoration, PA
10144, Beech Creek, Leidy and Noyes
11Townships, South Renovo Borough,
12Project ID 101911

 

13Project Allocation

16,571,000

14(Base Project Allocation -
15$16,421,000)

 

16(Design & Contingencies - $150,000)

 

17(45) SR 0150, Rehabilitation, Resurface,
18SR 0150, Bellefonte Avenue, Flemington
19Borough, City of Lock Haven, Project
20ID 101959

 

21Project Allocation

1,093,000

22(Base Project Allocation - $1,000,000)

 

23(Land Allocation - $20,000)

 

24(Design & Contingencies - $73,000)

 

25(46) SR 0064, Resurface, SR 0064, Peach
26Orchard Road to Cedar Springs,
27Segments 0080/0000 to 0120/0000, Lamar
28and Porter Townships, Project ID 99952

 

29Project Allocation

660,000

30(Base Project Allocation - $660,000)

 

1(47) SR 0144, Resurface, SR 0144, Huron
2Avenue to Drury Run, Segments
30380/1282 to 0430/0000, Noyes and
4Leidy Townships, Renovo Borough,
5Project ID 99956

 

6Project Allocation

650,000

7(Base Project Allocation - $650,000)

 

8(48) SR 0477, Resurface, SR 0477, Salona
9East, Segments 0020/0000 to 0120/0000,
10Lamar Township, Loganton Borough,
11Greene Township, Project ID 99965

 

12Project Allocation

1,636,000

13(Base Project Allocation - $1,636,000)

 

14(49) Various, Tree Trimming Safety
15Improvements, Various State Routes
16throughout Clinton, Juniata and
17Mifflin Counties, Various
18Municipalities, Project ID 88352

 

19Project Allocation

500,000

20(Base Project Allocation - $500,000)

 

21(50) Various, Highway Portion Bridge
22Preservation Activities, Various State
23Routes, Various Municipalities,
24Project ID 69514

 

25Project Allocation

868,000

26(Base Project Allocation - $815,000)

 

27(Land Allocation - $11,000)

 

28(Design & Contingencies - $42,000)

 

29Section 319. Columbia County.

30Projects are as follows:

 

1(1) (Reserved).

 

2(2) SR 0339, Resurface, SR 0339 from West
3Street to the Luzerne County Line,
4Mifflin Township, Project ID 87882

 

5Project Allocation

925,000

6(Land Allocation - $593,000)

 

7(Design & Contingencies - $332,000)

 

8(3) SR 0061, SR 0487, SR 4049, Highway
9Portion Bridge Preservation, SR 0061
10over Shamokin Creek in Coal Township,
11SR 0487 over Shamokin Creek in Ralpho
12and Shamokin Townships, Northumberland
13County, SR 4049 over West Branch
14Fishing Creek in Sugarloaf, Columbia
15County, Various Municipalities in
16Columbia, Northumberland and Snyder
17Counties, Project ID 87993

 

18Project Allocation

215,000

19(Base Project Allocation - $210,000)

 

20(Design & Contingencies - $5,000)

 

21(4) SR 0093, Highway Portion Bridge
22Replacement, SR 0093 over Branch of
23Briar Creek, BMS 19-0093-0170-0000,
24North Centre Township, Project ID
2587998

 

26Project Allocation

1,015,000

27(Base Project Allocation - $895,000)

 

28(Land Allocation - $45,000)

 

29(Design & Contingencies - $75,000)

 

30(5) SR 0254, Mill and Resurface, SR 0254,

 

1Segments 0170/0096 to 0290/1636,
2Greenwood Township, Millville Borough,
3Project ID 87885

 

4Project Allocation

5,961,000

5(Base Project Allocation - $5,901,000)

 

6(Design & Contingencies - $60,000)

 

7(6) SR 0042, Mill and Resurface, SR 0042,
8Segments 0700/1316 to 0760/1250,
9Greenwood Township, Millville Borough,
10Project ID 87884

 

11Project Allocation

380,000

12(Base Project Allocation - $380,000)

 

13(7) SR 0093, Mill and Resurface Roadway,
14SR 0093 from US 11 to Slowick Road (T-
15503), Segments/Offset 0040/0125 to
160150/1125, Berwick and Briar Creek
17Boroughs, Briar Creek and North Centre
18Townships, Project ID 87883

 

19Project Allocation

4,585,000

20(Base Project Allocation - $4,516,000)

 

21(Design & Contingencies - $69,000)

 

22(8) SR 0011, Reconstruct Roadway, US 11
23from East Main Street to 6th Street,
24SR 0011, Segments 0150/0000 to
250150/1971, Town of Bloomsburg, Project
26ID 94702

 

27Project Allocation

402,000

28(Land Allocation - $101,000)

 

29(Design & Contingencies - $301,000)

 

30(9) SR 0011, Mill and Resurface Roadway,

 

1US 11 from Park Street to Shaffer
2Street, Segments/Offset 0170/1237 to
30210/1881, Town of Bloomsburg, Scott
4Township, Project ID 87250

 

5Project Allocation

323,000

6(Base Project Allocation - $307,000)

 

7(Design & Contingencies - $16,000)

 

8(10) SR 0118, Highway Portion Bridge
9Rehabilitation, SR 0118 over the East
10Branch of Fishing Creek, BMS 19-0118-
110080-1238, Sugarloaf Township, Project
12ID 97622

 

13Project Allocation

1,123,000

14(Base Project Allocation - $921,000)

 

15(Land Allocation - $101,000)

 

16(Design & Contingencies - $101,000)

 

17(11) SR 0487, Highway Portion Bridge
18Rehabilitation, SR 0487 over Abandoned
19Railroad, BMS 19-0487-0330-0269, Scott
20Township, Project ID 97624

 

21Project Allocation

2,422,000

22(Base Project Allocation - $2,021,000)

 

23(Land Allocation - $101,000)

 

24(Design & Contingencies - $300,000)

 

25(12) SR 4036, Highway Portion Bridge
26Replacement, SR 4036 over Hemlock
27Creek, Hemlock and Montour Townships,
28Project ID 97580

 

29Project Allocation

1,503,000

30(Base Project Allocation - $1,301,000)

 

1(Land Allocation - $101,000)

 

2(Design & Contingencies - $101,000)

 

3(13) SR 0487, Highway Portion Bridge
4Replacement, SR 0487 over Tributary of
5Coles Creek, Sugarloaf Township,
6Project ID 97577

 

7Project Allocation

1,503,000

8(Base Project Allocation - $1,301,000)

 

9(Land Allocation - $101,000)

 

10(Design & Contingencies - $101,000)

 

11(14) SR 0339, Highway Portion Bridge
12Replacement, SR 0339 over Tributary of
13Catawissa Creek, Main Township,
14Project ID 97636

 

15Project Allocation

1,323,000

16(Base Project Allocation - $1,021,000)

 

17(Land Allocation - $101,000)

 

18(Design & Contingencies - $201,000)

 

19(15) SR 0339, Highway Portion Bridge
20Replacement, SR 0339 over Tributary of
21Susquehanna River, Mifflin Township,
22Project ID 97638

 

23Project Allocation

1,323,000

24(Base Project Allocation - $1,021,000)

 

25(Land Allocation - $101,000)

 

26(Design & Contingencies - $201,000)

 

27(16) SR 0080, Mill and Resurface, I-80
28West Bound from Montour/Columbia
29County Line to Town of Bloomsburg, SR
300080 from Segments 2283/0000 to

 

12325/2149, Hemlock Township, Project
2ID 82309

 

3Project Allocation

3,212,000

4(Base Project Allocation - $3,200,000)

 

5(Design & Contingencies - $12,000)

 

6(17) SR 0042, Highway Portion Bridge
7Replacement, SR 0042 over Tributary of
8Catawissa Creek, Catawissa Township,
9Project ID 97572

 

10Project Allocation

1,503,000

11(Base Project Allocation - $1,301,000)

 

12(Land Allocation - $101,000)

 

13(Design & Contingencies - $101,000)

 

14(18) SR 0011, Resurface Roadway, US Route
1511 from the Montour County Line to TR
16407 (Cross Road), Segments/Offset
170010/0000 to 0060/0050, Montour
18Township, Project ID 87831

 

19Project Allocation

1,514,000

20(Base Project Allocation - $1,500,000)

 

21(Design & Contingencies - $14,000)

 

22(19) SR 0011, Intersection Improvement,
23Signal Upgrade, SR 0011 Segments
240390/1485 to 0430/0480, Berwick
25Borough, Project ID 97648

 

26Project Allocation

2,000,000

27(Base Project Allocation - $1,600,000)

 

28(Land Allocation - $100,000)

 

29(Design & Contingencies - $300,000)

 

30(20) SR 1019, Rehabilitation, Resurface,

 

1SR 1019 (Kachinka Hollow Road) from SR
21014 (Martzville Raod) to SR 1025
3(Johnstown Road), Briar Creek
4Township, Project ID 97754

 

5Project Allocation

380,000

6(Base Project Allocation - $380,000)

 

7(21) SR 0487, Reconstruct Roadway, SR
80487 from Susquehanna River to US 11,
9SR 0487, Segments 0240/0000 to
100260/0363, Town of Bloomsburg, Project
11ID 97652

 

12Project Allocation

1,977,000

13(Base Project Allocation - $1,700,000)

 

14(Land Allocation - $101,000)

 

15(Design & Contingencies - $176,000)

 

16(22) SR 0054, Resurface, PA 54 from
17Northumberland County Line to
18Schuylkill County Line, Segments
190012/0000 to 0012/1568, Conyngham
20Township, Project ID 97694

 

21Project Allocation

125,000

22(Base Project Allocation - $105,000)

 

23(Design & Contingencies - $20,000)

 

24(23) SR 1025, Highway Portion Bridge
25Replacement, SR 1025 over East Branch
26Briar Creek, BMS 19-1025-0110-0957,
27Briar Creek Township, Project ID 97557

 

28Project Allocation

250,000

29(Base Project Allocation - $150,000)

 

30(Land Allocation - $40,000)

 

1(Design & Contingencies - $60,000)

 

2(24) SR 0080, Mill and Resurface, I-80
3from Montour County to SR 4009, SR
40080, Segments 2282/0000 to 2330/1721,
5Town of Bloomsburg, Hemlock Township,
6Project ID 97552

 

7Project Allocation

1,127,000

8(Base Project Allocation - $1,027,000)

 

9(Design & Contingencies - $100,000)

 

10(25) SR 0011, Sanitary Storm Sewer, SR
110011, Front and Second Streets,
12Berwick Borough, Project ID 92309

 

13Project Allocation

1,596,000

14(Base Project Allocation - $1,596,000)

 

15(26) I-80, Reconstruction, I-80 East
16Bound Rest Area Parking, Mifflin
17Township, Project ID 97736

 

18Project Allocation

5,000,000

19(Base Project Allocation - $4,500,000)

 

20(Design & Contingencies - $500,000)

 

21(27) SR 0080, Roadway Reconstruction, I-
2280 from Paper Mill Road, to US 11,
23Segments 2330/1788 to 2404/1364, Town
24of Bloomsburg, Mount Pleasant, Scott
25and South Centre Townships, Project ID
2693697

 

27Project Allocation

14,429,000

28(Base Project Allocation -
29$14,029,000)

 

30(Design & Contingencies - $400,000)

 

1(28) SR 0487, Highway Portion Bridge
2Replacement, SR 0487 over Tributary of
3Fishing Creek, Orange Township,
4Project ID 91431

 

5Project Allocation

277,000

6(Base Project Allocation - $277,000)

 

7(29) SR 0487, Resurface, PA 487 from
8Hollow Road to PA 239, Segments
90510/3083 to 0650/2025, Benton
10Borough, Benton and Fishing Creek
11Townships, Stillwater Borough, Project
12ID 97695

 

13Project Allocation

2,422,000

14(Base Project Allocation - $2,401,000)

 

15(Design & Contingencies - $21,000)

 

16(30) SR 1014, Highway Portion Bridge
17Replacement, SR 1014 over Tributary of
18East Branch of Briar Creek, Briar
19Creek Township, Project ID 98400

 

20Project Allocation

243,000

21(Base Project Allocation - $161,000)

 

22(Land Allocation - $41,000)

 

23(Design & Contingencies - $41,000)

 

24(31) SR 0044, Reconstruct Roadway, SR
250044 from SR 0042 to Fire Hall Road,
26SR 0044, Segments 0010/0000 to
270010/2233, Hemlock Township, Project
28ID 100406

 

29Project Allocation

2,805,000

30(Base Project Allocation - $2,500,000)

 

1(Land Allocation - $80,000)

 

2(Design & Contingencies - $225,000)

 

3(32) SR 1035, Highway Portion Bridge
4Replacement, SR 1035 over Raven Creek,
5Benton Township, Project ID 98404

 

6Project Allocation

281,000

7(Base Project Allocation - $151,000)

 

8(Land Allocation - $65,000)

 

9(Design & Contingencies - $65,000)

 

10(33) SR 0339, Highway Portion Bridge
11Replacement, SR 0339 over Tributary of
12Susquehanna River, Mifflin Township,
13Project ID 98416

 

14Project Allocation

200,000

15(Land Allocation - $100,000)

 

16(Design & Contingencies - $100,000)

 

17(34) SR 0044, Resurface, SR 0044 from
18Shelter Lane to PA 254, Segments
190150/0000 to 0200/1446, Madison
20Township, Project ID 99055

 

21Project Allocation

491,000

22(Base Project Allocation - $471,000)

 

23(Design & Contingencies - $20,000)

 

24(35) SR 0080, Major Guide Sign
25Replacement, I-80 in Columbia County,
26Various Municipalities, Project ID
2799317

 

28Project Allocation

65,000

29(Base Project Allocation - $60,000)

 

30(Design & Contingencies - $5,000)

 

1(36) SR 2009, Slide Repair, SR 2009 from
2Dogwood Lane to Scenic Avenue,
3Catawissa Township, Project ID 99147

 

4Project Allocation

130,000

5(Base Project Allocation - $29,000)

 

6(Design & Contingencies - $101,000)

 

7(37) SR 0080, Reconstruction, I-80 East
8Bound from Paper Mill Road to SR 0011,
9Town of Bloomsburg, Mount Pleasant,
10Scott and South Centre Townships,
11Project ID 99355

 

12Project Allocation

2,425,000

13(Base Project Allocation - $2,425,000)

 

14(38) SR 0080, Resurface, I-80 West Bound
15from SR 2028 to Luzerne County Line,
16Mifflin Township, Project ID 99144

 

17Project Allocation

864,000

18(Base Project Allocation - $763,000)

 

19(Design & Contingencies - $101,000)

 

20(39) SR 2003, Resurface, Ringtown
21Mountain Road to Creek Road, Segments
220060/0000 to 0170/2553, Roaring Creek
23Township, Project ID 99122

 

24Project Allocation

1,621,000

25(Base Project Allocation - $1,600,000)

 

26(Design & Contingencies - $21,000)

 

27(40) SR 1020, Resurface, SR 1020 from
28Village of Forks to Luzerne County
29Line, Segments 0010/0000 to 0120/1428,
30Fishing Creek Township, Project ID

 

199106

 

2Project Allocation

1,606,000

3(Base Project Allocation - $1,585,000)

 

4(Design & Contingencies - $21,000)

 

5(41) SR 0487, Resurface, PA 239 to PA
6118, Segments 0660/0000 to 0790/0605,
7Benton and Sugarloaf Townships,
8Project ID 99096

 

9Project Allocation

1,322,000

10(Base Project Allocation - $1,301,000)

 

11(Design & Contingencies - $21,000)

 

12(42) SR 0487, Resurface, Segments
130430/0500 to 0510/3083, Fishing Creek
14and Orange Townships, Orangeville
15Borough, Project ID 99088

 

16Project Allocation

1,396,000

17(Base Project Allocation - $1,376,000)

 

18(Design & Contingencies - $20,000)

 

19(43) SR 0487, Resurface, Central Road to
20Village of Light Street, Segments
210320/0000, to 0350/1502, Segments
220321/0000 to 0321/1801, Orange and
23Scott Townships, Project ID 99083

 

24Project Allocation

420,000

25(Base Project Allocation - $400,000)

 

26(Design & Contingencies - $20,000)

 

27(44) SR 0487, Resurface, US 11 to Central
28Road, Segments 0280/0000 to 0310/3027,
29Town of Bloomsburg, Scott Township,
30Project ID 99078

 

1Project Allocation

1,220,000

2(Base Project Allocation - $1,200,000)

 

3(Design & Contingencies - $20,000)

 

4(45) SR 0011, Resurface, SR 0011 from
5Shaffer Street to Lows Street,
6Segments 0210/1881 to 0270/2175, Scott
7and South Centre Townships, Project ID
899404

 

9Project Allocation

2,521,000

10(Base Project Allocation - $2,500,000)

 

11(Design & Contingencies - $21,000)

 

12(46) SR 0442, Resurface, SR 0442 from the
13Lycoming County Line to PA 42 Segments
140010/0000 to 0080/1262, Greenwood and
15Pine Townships, Project ID 99071

 

16Project Allocation

721,000

17(Base Project Allocation - $700,000)

 

18(Design & Contingencies - $21,000)

 

19(47) SR 0339, Resurface, SR 0339 from
20Greenhouse Road to Catawissa Creek,
21Segments 0060/0000 to 0100/2790,
22Beaver Township, Project ID 99067

 

23Project Allocation

1,335,000

24(Base Project Allocation - $1,315,000)

 

25(Design & Contingencies - $20,000)

 

26(48) SR 0254, Highway Portion Bridge
27Replacement, SR 0254 over Tributary of
28Mud Run, BMS 19-0254-0250-0486

 

29Project Allocation

401,000

30(Land Allocation - $100,000)

 

1(Design & Contingencies - $301,000)

 

2(49) SR 1013, Highway Portion Bridge
3Replacement, SR 1013 over Strong
4Brook, Orange Township, Project ID
598398

 

6Project Allocation

281,000

7(Base Project Allocation - $151,000)

 

8(Land Allocation - $65,000)

 

9(Design & Contingencies - $65,000)

 

10(50) SR 1012, Highway Portion Bridge
11Replacement, SR 1012 over Tributary of
12Briar Creek, Briar Creek Township,
13Project ID 98396

 

14Project Allocation

281,000

15(Base Project Allocation - $151,000)

 

16(Land Allocation - $65,000)

 

17(Design & Contingencies - $65,000)

 

18(51) SR 0011, Highway Portion Bridge
19Replacement, US 11 over Montour Creek,
20Montour Township, Project ID 98392

 

21Project Allocation

270,000

22(Base Project Allocation - $70,000)

 

23(Land Allocation - $100,000)

 

24(Design & Contingencies - $100,000)

 

25(52) SR 0080, Major Guide Sign Upgrade,
26I-80 in Columbia County, Various
27Municipalities, Project ID 99283

 

28Project Allocation

110,000

29(Base Project Allocation - $100,000)

 

30(Design & Contingencies - $10,000)

 

1(53) SR 0061, Resurface, SR 0061 from SR
22061 to Northumberland County Line,
3Segments 0042/0000 to 0113/2633,
4Centralia Borough, Conyngham Township,
5Project ID 99066

 

6Project Allocation

2,251,000

7(Base Project Allocation - $2,230,000)

 

8(Design & Contingencies - $21,000)

 

9(54) SR 0044, Highway Portion Bridge
10Replacement, SR 0044 over Tributary of
11Mud Creek, BMS 19-0044-0230,0000,
12Madison Township, Project ID 98928

 

13Project Allocation

300,000

14(Land Allocation - $50,000)

 

15(Design & Contingencies - $250,000)

 

16(55) SR 0061, Resurface, SR 0061 from
17Schuylkill County Line to SR 2002,
18Segments 0012/0000 to 0015/0867,
19Conyngham Township, Project ID 99064

 

20Project Allocation

451,000

21(Base Project Allocation - $431,000)

 

22(Design & Contingencies - $20,000)

 

23(56) SR 0042, Resurface Roadway, SR 0042
24from Poor House Road to Catawissa
25Creek, Cattiwissa, Conyngham and
26Locust Townships, Project ID 100443

 

27Project Allocation

4,991,000

28(Base Project Allocation - $4,941,000)

 

29(Design & Contingencies - $50,000)

 

30(57) SR 0254, Highway Portion Bridge

 

1Replacement, SR 0254 over Tributary of
2Fishing Creek, BMS 19-0254-0380-1152,
3Benton Township, Project ID 98941

 

4Project Allocation

401,000

5(Land Allocation - $100,000)

 

6(Design & Contingencies - $301,000)

 

7(58) SR 0011, Resurface, SR 0011 from
8Sixth Street to Park Street, Segments
90011/0160 to 0170/1237, Bloomsburg
10Borough, Project ID 98962

 

11Project Allocation

121,000

12(Base Project Allocation - $110,000)

 

13(Design & Contingencies - $11,000)

 

14(59) SR 0042, Resurface, SR 0042 from SR
153006 to Poor House Road, Segments
160050/1100 to 0090/2052, Conyngham
17Township, Project ID 99053

 

18Project Allocation

911,000

19(Base Project Allocation - $836,000)

 

20(Design & Contingencies - $75,000)

 

21(60) SR I-80, Reconstruction, I-80 from
22the Montour County Line to the Luzerne
23County Line, Various Municipalities,
24Project ID 0

 

25Project Allocation

76,400,000

26(Base Project Allocation -
27$76,400,000)

 

28(61) SR 0011, Highway Portion Bridge
29Preservation, SR 0011 Northbound over
30Fishing Creek, BMS 19-0011-0080-0000,

 

1Town of Bloomsburg, Montour Township,
2Project ID 98926

 

3Project Allocation

151,000

4(Design & Contingencies - $151,000)

 

5(62) SR 2005, Resurface Roadway, SR 2005
6from SR 0042 to SR 4029, Catawissa and
7Locust Townships, Project ID 98517

 

8Project Allocation

341,000

9(Base Project Allocation - $319,000)

 

10(Design & Contingencies - $22,000)

 

11(63) SR 4037, Resurface Roadway, SR 4037
12from SR 0254 to Johnson Road,
13Greenwood Township, Project ID 98523

 

14Project Allocation

595,000

15(Base Project Allocation - $559,000)

 

16(Design & Contingencies - $36,000)

 

17(64) SR 4025, Resurface Roadway, SR 4025
18from Montour County Line to SR 0044,
19Madison Township, Project ID 98522

 

20Project Allocation

167,000

21(Base Project Allocation - $152,000)

 

22(Design & Contingencies - $15,000)

 

23(65) SR 2012, Resurface Roadway, SR 2012
24from SR 2010 to SR 2003, Locust and
25Roaring Creek Townships, Project ID
2698520

 

27Project Allocation

679,000

28(Base Project Allocation - $633,000)

 

29(Design & Contingencies - $46,000)

 

30(66) SR 1015, Resurface Roadway, SR 1015

 

1from SR 0011 to SR 1037, North Centre
2and South Centre Townships, Project ID
398513

 

4Project Allocation

243,000

5(Base Project Allocation - $228,000)

 

6(Design & Contingencies - $15,000)

 

7(67) SR 1013, Resurface Roadway, SR 1013
8from SR 1003 to SR 0093, Orange
9Township, Orangeville Borough, Scott
10Township, Project ID 98509

 

11Project Allocation

674,000

12(Base Project Allocation - $629,000)

 

13(Design & Contingencies - $45,000)

 

14(68) SR 0487, Resurface Roadway, SR 0487
15from SR 0042 to Rocky Lane, Catawissa
16Borough, Catawissa Township, Project
17ID 98506

 

18Project Allocation

36,000

19(Base Project Allocation - $20,000)

 

20(Design & Contingencies - $16,000)

 

21(69) SR 0239, Resurface Roadway, SR 0239
22from Luzerne County Line to SR 0487,
23Benton Borough, Benton Township,
24Project ID 98462

 

25Project Allocation

207,000

26(Base Project Allocation - $132,000)

 

27(Design & Contingencies - $75,000)

 

28(70) SR 0339, Resurface Roadway, SR 0339
29from Catawissa Creek to SR 2009,
30Beaver and Main Townships, Project ID

 

198483

 

2Project Allocation

148,000

3(Base Project Allocation - $98,000)

 

4(Design & Contingencies - $50,000)

 

5(71) SR 0487, Resurface Roadway, SR 0487
6from SR 0044 to Chestnut Street,
7Catawissa and Franklin Townships,
8Project ID 98489

 

9Project Allocation

103,000

10(Base Project Allocation - $68,000)

 

11(Design & Contingencies - $35,000)

 

12(72) Various, Highway Portion Bridge
13Preservation, SR 0042 over North
14Branch Susquehanna River, SR 0239 over
15West Creek, SR 0254 over Green Creek,
16SR 0442 over West Branch Run and SR
170487 over North Branch Susquehanna
18River and D&H Railroad, Benton
19Township, Town of Bloomsburg,
20Catawissa, Greenwood, Montour and Pine
21Townships, Project ID 97600

 

22Project Allocation

1,151,000

23(Base Project Allocation - $1,000,000)

 

24(Design & Contingencies - $151,000)

 

25(73) Various, Highway Portion Bridge 
26Preservation, SR 0487, SR 2007 and SR 
270015, Various Municipalities in 
28Columbia, Montour and Union Counties, 
29Project ID 86935

 

30Project Allocation

1,516,000

1(Base Project Allocation - $1,506,000)

 

2(Design & Contingencies - $10,000)

 

3(74) Various, Highway Portion Bridge 
4Preservation, Various State Routes, 
5Various Municipalities, Project ID 
698936

 

7Project Allocation

181,000

8(Base Project Allocation - $131,000)

 

9(Design & Contingencies - $50,000)

 

10(75) Various, Highway Portion Bridge 
11Preservation, Various State Routes, 
12Various Municipalities, Project ID 
1398395

 

14Project Allocation

422,000

15(Base Project Allocation - $371,000)

 

16(Design & Contingencies - $51,000)

 

17(76) Various, Highway Portion Bridge 
18Preservation, Various State Routes, 
19Various Municipalities, Project ID 
2098946

 

21Project Allocation

200,000

22(Base Project Allocation - $150,000)

 

23(Design & Contingencies - $50,000)

 

24(77) Various, Highway Portion Bridge 
25Preservation, SR 0011, SR 0118, SR 
260339, SR 1022, SR 2021, SR 4037 and SR 
271009, Various Municipalities in 
28Columbia and Montour Counties, Project 
29ID 98394

 

30Project Allocation

191,000

1(Base Project Allocation - $141,000)

 

2(Design & Contingencies - $50,000)

 

3Section 320. Crawford County.

4Projects are as follows:

 

5(1) (Reserved).

 

6(2) SR 0008, Resurface/Restoration, SR
70008 (Franklin Street) from the
8Venango County Line to Central Avenue,
9City of Titusville, Project ID 97878

 

10Project Allocation

372,000

11(Base Project Allocation - $321,000)

 

12(Design & Contingencies - $51,000)

 

13(3) SR 0027, Restoration/Resurface, SR
140027 from the Venango County Line to
15the Oil Creek Bridge, Oil Creek
16Township, City of Titusville, Project
17ID 97874

 

18Project Allocation

1,585,000

19(Base Project Allocation - $1,585,000)

 

20(4) SR 0027, Restoration/Resurface, SR
210027 (North Street/State Street) from
22Park Avenue to Washington Street, City
23of Meadville, Project ID 97879

 

24Project Allocation

401,000

25(Base Project Allocation - $401,000)

 

26(5) I-79, Highway Reconstruction, I-79
27from PA 98 Crawford County to I-79,
28Exit 166, Erie County, Hayfield,
29Cussewago and Washington Townships,
30Project ID 92594

 

1Project Allocation

2,300,000

2(Base Project Allocation - $2,300,000)

 

3(6) SR 2037, Restoration/Resurface, SR
42037 (Baldwin Street) from North Main
5Street to SR 0006, City of Meadville,
6West Mead Township, Project ID 97876

 

7Project Allocation

1,085,000

8(Base Project Allocation - $1,085,000)

 

9(7) SR 0019, Reconstruction, SR 0019
10(Perry Highway), SR 0098 and SR 0006
11(Grand Army of the Republic Highway),
12Vernon Township, Project ID 96708

 

13Project Allocation

3,302,000

14(Base Project Allocation - $3,251,000)

 

15(Design & Contingencies - $51,000)

 

16(8) SR 0079, Resurface/Restoration, I-79
17(Raymond P. Shafer Higway) from the
18Mercer County Line to the Geneva Exit,
19Greenwood Township, Project ID 92599

 

20Project Allocation

950,000

21(Base Project Allocation - $950,000)

 

22(9) SR 0079, Slide Correction/Roadway
23Failure, I-79 (Raymond P. Shafer
24Highway), on the Northbound Lanes near
25Mile Marker 145, South of SR 0322
26(Meadville) Interchange, Vernon
27Township, Project ID 97666

 

28Project Allocation

247,000

29(Base Project Allocation - $147,000)

 

30(Design & Contingencies - $100,000)

 

1(10) SR 0079, Restoration/Resurface, I-79
2Northbound (Raymond P. Shafer Highway)
3from Milepost 147.5 to Milepost 153.5,
4Hayfield and Vernon Townships, Project
5ID 97882

 

6Project Allocation

10,000,000

7(Base Project Allocation -
8$10,000,000)

 

9(11) SR 1001, Restoration, ADA Curb Cuts,
10SR 1001 (Park Avenue) to Park Avenue
11Extension, City of Meadville, Project
12ID 94721

 

13Project Allocation

57,000

14(Base Project Allocation - $57,000)

 

15(12) SR 0408, Restoration/Resurface, SR
160408 (Church Street) from Cambridge
17Springs Road to SR 1014, Cambridge
18Springs Borough, Cambridge and
19Rockdale Townships, Project ID 97881

 

20Project Allocation

1,001,000

21(Base Project Allocation - $867,000)

 

22(Design & Contingencies - $134,000)

 

23(13) SR 0089, Restoration/Resurface, SR
240089 (Franklin Street/Church Run Road)
25from Central Avenue to the Titusville
26City Limits, Oil Creek Township, City
27of Titusville, Project ID 97880

 

28Project Allocation

586,000

29(Base Project Allocation - $586,000)

 

30(14) SR 0408, Resurface, SR 0408 (Church

 

1Street to Thompson Street) from SR
21014 to the Hydetown Borough Line,
3Hydetown Borough, Oil Creek, Richmond,
4Rockdale, Steuben Townships, Townville
5Borough, Troy Township Project ID
697865

 

7Project Allocation

2,100,000

8(Base Project Allocation - $2,100,000)

 

9(15) SR 0886, Restoration/Resurface, SR
100886 (Main Street) from SR 0027 to Oak
11Street, City of Meadville, Project ID
1297877

 

13Project Allocation

1,000,000

14(Base Project Allocation - $1,000,000)

 

15(16) SR 1001, Resurfacing/Restoration, SR
161001 (Park Avenue) from Linden to
17Randolph, City of Meadville, Project
18ID 32161

 

19Project Allocation

1,000,000

20(Base Project Allocation - $1,000,000)

 

21(17) SR 0079, Resurface, I-79 (Raymond P.
22Shafer Highway) from North of the
23Crossing over Van Horn Run near
24Milepost 14 to the Maintenance
25Crossover, Hayfield and Vernon
26Townships, Project ID 91570

 

27Project Allocation

10,000,000

28(Base Project Allocation -
29$10,000,000)

 

30(18) SR 0285, Resurfacing/Restoration, SR

 

10285, (Steele's Corridor) from
2Conneaut Lake Borough, West to SR
33011, North Shenango and Sadsbury
4Townships, Project ID 90277

 

5Project Allocation

873,000

6(Base Project Allocation - $793,000)

 

7(Design & Contingencies - $80,000)

 

8(19) SR 2007, Resurface, SR 2007
9(Thurston Road) from Alden Street
10Extension to SR 0027, City of
11Meadville, West Mead Township, Project
12ID 32165

 

13Project Allocation

212,000

14(Base Project Allocation - $212,000)

 

15(20) SR 0285, Restoration/Resurfacing, SR
160285 from Third Street to Center
17Street and SR 0322 (28th Division
18Highway) from the West Mead Township
19Line to Cochranton Borough, East
20Fairfield, East Fallowfield,
21Greenwood, Sadsbury and West Mead
22Townships, Project ID 96880

 

23Project Allocation

2,885,000

24(Base Project Allocation - $2,885,000)

 

25(21) SR 0006, Safety Improvement,
26Shoulders and Highway Reconstruction,
27SR 0006 from Park Road to SR 2037,
28City of Meadville, West Mead Township,
29Project ID 85776

 

30Project Allocation

1,200,000

1(Base Project Allocation - $1,200,000)

 

2(22) SR 1001, Restoration/Resurface, SR
31001 (Park Avenue) from SR 322 to
4Randolph Street in the City of
5Meadville, City of Meadville, Project
6ID 97875

 

7Project Allocation

1,000,000

8(Base Project Allocation - $1,000,000)

 

9(23) SR 0006, Resurface/Restoration, SR
100006 (French Creek Parkway) from the
11Baldwin Street Intersection to the Two
12Lane Section on SR 0006, West Mead
13Township, Project ID 98960

 

14Project Allocation

100,000

15(Base Project Allocation - $100,000)

 

16(24) SR 2037, Resurface/Restoration, SR
172037 (Baldwin Street Extention) from
18the Four Lane Concrete Section to SR
190006, West Mead Township, Project ID
2098959

 

21Project Allocation

100,000

22(Base Project Allocation - $100,000)

 

23(25) I-79, Reconstruction, I-79 from the
24Mercer County Line to the Erie County
25Line, Various Municipalities, Project
26ID 0

 

27Project Allocation

108,400,000

28(Base Project Allocation -
29$108,400,000)

 

30(26) SR 0699, Resurface/Restoration, SR

 

10699 (McClellan Street) from SR 0006
2to Forest Street, Cambridge Springs
3Borough, Project ID 98839

 

4Project Allocation

250,000

5(Base Project Allocation - $200,000)

 

6(Design & Contingencies - $50,000)

 

7(27) SR 2035, Resurface/Restoration, SR
82035 (Williamson Road/Popular
9Street/Liberty Street) from First
10Street to SR 0027, City of Meadville,
11West Mead Township, Project ID 98956

 

12Project Allocation

601,000

13(Base Project Allocation - $551,000)

 

14(Design & Contingencies - $50,000)

 

15(28) SR 2034, Resurface/Restoration, SR
162034 (Spring Street) from Lincoln
17Street to SR 2037, City of Meadville,
18Project ID 98950

 

19Project Allocation

301,000

20(Base Project Allocation - $250,000)

 

21(Design & Contingencies - $51,000)

 

22(29) SR 0006, Resurface/Restoration, SR
230006 (French Creek Parkway) from the
24Smock Bridge to Baldwin Street, City
25of Meadville, Vernon and West Mead
26Township and Project ID 98854

 

27Project Allocation

2,252,000

28(Base Project Allocation - $2,151,000)

 

29(Design & Contingencies - $101,000)

 

30(30) SR 1001, Resurface/Restoration, SR

 

11001 (Park Avenue) from Randolph
2Street to Allegheny Street, City of
3Meadville, Project ID 98686

 

4Project Allocation

394,000

5(Base Project Allocation - $343,000)

 

6(Design & Contingencies - $51,000)

 

7(31) SR 0006, Resurface/Restoration, SR
80006 (Water Street) from 9th Street to
9the Borough Line, Conneaut Lake
10Borough, Sadsbury Township, Project ID
1198690

 

12Project Allocation

732,000

13(Base Project Allocation - $681,000)

 

14(Design & Contingencies - $51,000)

 

15(32) SR 2024, Resurface/Restoration, SR
162024 (Bloss Street) from Franklin
17Street to Drake Street, City of
18Titusville, Project ID 98607

 

19Project Allocation

48,000

20(Base Project Allocation - $48,000)

 

21(33) SR 0008, Resurface/Restoration, SR
220008 (Spring Street) from Diamond
23Street to Central Avenue, City of
24Titusville, Project ID 98711

 

25Project Allocation

233,000

26(Base Project Allocation - $182,000)

 

27(Design & Contingencies - $51,000)

 

28(34) SR 2024, Resurface/Restoration, SR
292024 (Saint John Street) from Perry
30Street to Franklin Street, City of

 

1Titusville, Project ID 98603

 

2Project Allocation

80,000

3(Base Project Allocation - $80,000)

 

4(35) SR 2029, Resurface/Restoration, SR
52029 (Hydetown Gresham Road) from
6Hasbrouck Sand and Gravel to SR 0408,
7Hydetown Borough, Project ID 98929

 

8Project Allocation

100,000

9(Base Project Allocation - $100,000)

 

10(36) SR 3011, Resurface/Restoration, SR
113011 (Mercer Street) from the
12Linesville Borough Line to SR 0006
13(Erie Street), Linesville Borough,
14Project ID 98726

 

15Project Allocation

110,000

16(Base Project Allocation - $110,000)

 

17(37) SR 2012, Resurface/Restoration, SR
182012, (Chestnut Street) from Diamond
19Park to Porter Street, City of
20Meadville, Project ID 98728

 

21Project Allocation

349,000

22(Base Project Allocation - $298,000)

 

23(Design & Contingencies - $51,000)

 

24(38) SR 2028, Resurface/Restoration, SR
252028 (Enterprise Road) from SR 0027 to
26the Warren County Line, Oil Creek
27Township, Project ID 98923

 

28Project Allocation

500,000

29(Base Project Allocation - $450,000)

 

30(Design & Contingencies - $50,000)

 

1(39) SR 0006, Resurface/Restoration, SR
20198/0006 (Main Street) from South
3Street to McGill Street, Saegertown
4Borough, Project ID 98729

 

5Project Allocation

393,000

6(Base Project Allocation - $343,000)

 

7(Design & Contingencies - $50,000)

 

8(40) SR 0077, Resurface/Restoration and
9Safety Improvements, SR 0077 near the
10Intersection with SR 0408, Richmond
11Township, Project ID 98918

 

12Project Allocation

151,000

13(Base Project Allocation - $101,000)

 

14(Design & Contingencies - 50,000)

 

15(41) SR 0006, Resurface/Restoration, SR
160006 from Penn Street to Chestnut
17Street, Linesville Borough, Pine
18Township, Project ID 98688

 

19Project Allocation

976,000

20(Base Project Allocation - $925,000)

 

21(Design & Contingencies - $51,000)

 

22(42) SR 0027, Resurface/Restoration, SR
230027 (Central Avenue/Diamond Street)
24from the Oil Creek Bridge to Martin
25Street, City of Titusville, Project ID
2698608

 

27Project Allocation

221,000

28(Base Project Allocation - $171,000)

 

29(Design & Contingencies - $50,000)

 

30(43) SR 0173, Resurface/Restoration, SR

 

10173 from the Mercer County Line to
2French Creek, Fairfield Township,
3Project ID 98977

 

4Project Allocation

677,000

5(Base Project Allocation - $626,000)

 

6(Design & Contingencies - $51,000)

 

7(44) SR 4013, Resurface/Restoration, SR
84013 (South Hickernell Road) from SR
94018 to SR 4010, Spring Township,
10Project ID 98995

 

11Project Allocation

575,000

12(Base Project Allocation - $524,000)

 

13(Design & Contingencies - $51,000)

 

14(45) SR 0699, Resurface, SR 0699
15(McClellan Street/Forest Street) from
16McClellan Street to the Erie County
17Line, Cambridge Springs Borough,
18Cambridge and Venango Townships,
19Project ID 98996

 

20Project Allocation

1,417,000

21(Base Project Allocation - $1,417,000)

 

22(46) SR 0079, Resurface/Restoration, I-79
23(Raymond P. Shafer Highway) from
24Milepost 141 to Milepost 153.5,
25Greenwood, Hayfield, Union and Vernon
26Townships, Project ID 98998

 

27Project Allocation

10,500,000

28(Base Project Allocation -
29$10,500,000)

 

30(47) SR 0198, Resurface/Restoration, SR

 

10198 from SR 4007 to SR 0098, Hayfield
2Township, Project ID 98976

 

3Project Allocation

460,000

4(Base Project Allocation - $410,000)

 

5(Design & Contingencies - $50,000)

 

6(48) SR 0408, Resurface/Restoration, SR
70408 (Church Street) from Henry Road
8to SR 0077, Richmond and Rockdale
9Townships, Project ID 98602

 

10Project Allocation

1,787,000

11(Base Project Allocation - $1,686,000)

 

12(Design & Contingencies - $101,000)

 

13(49) SR 0408, Resurface/Restoration, SR
140408 from the Troy Township Line to SR
150408 (Troy Center Road), Troy
16Township, Project ID 98601

 

17Project Allocation

1,379,000

18(Base Project Allocation - $1,278,000)

 

19(Design & Contingencies - $101,000)

 

20(50) SR 0008, Resurface/Restoration, SR
210008 (Spring Street) from Skyline
22Drive to SR 0208, Hydetown Borough,
23Oil Creek Township, Project ID 98683

 

24Project Allocation

357,000

25(Base Project Allocation - $307,000)

 

26(Design & Contingencies - $50,000)

 

27(51) SR 1031, Resurface/Restoration, SR
281031 (Graytown Hills Road) from SR
291012 to SR 0408, Richmond and Rockdale
30Townships, Project ID 98974

 

1Project Allocation

663,000

2(Base Project Allocation - $612,000)

 

3(Design & Contingencies - $51,000)

 

4(52) SR 0018, Resurface/Restoration, SR
50018 (Springboro Road/Main Street)
6from the Conneautville Borough Line to
7the Springboro Line, Spring Township,
8Springboro Borough, Project ID 98897

 

9Project Allocation

800,000

10(Base Project Allocation - $750,000)

 

11(Design & Contingencies - $50,000)

 

12(53) SR 0886, Resurface/Restoration, SR
130886 (Main Street) from Cambridge
14Springs to SR 0006, Cambridge Springs
15Borough, Cambridge Township, Project
16ID 98818

 

17Project Allocation

500,000

18(Base Project Allocation - $450,000)

 

19(Design & Contingencies - $50,000)

 

20(54) SR 0027, Safety Improvement, SR 0027
21(Wayland's Curve), East Mead Township,
22Project ID 98307

 

23Project Allocation

3,001,000

24(Base Project Allocation - $2,901,000)

 

25(Design & Contingencies - $100,000)

 

26(55) SR 0173, Resurface/Restoration, SR
270173 from SR 0322 to SR 2014, Wayne
28Township, Project ID 98621

 

29Project Allocation

1,833,000

30(Base Project Allocation - $1,732,000)

 

1(Design & Contingencies - $101,000)

 

2(56) SR 0027, Resurface/Restoration, SR
30027 (Diamond Street/Main Street) from
4Martin Street to Lynn Street, City of
5Titusville, Project ID 98625

 

6Project Allocation

411,000

7(Base Project Allocation - $360,000)

 

8(Design & Contingencies - $51,000)

 

9(57) SR 0027, Resurface/Restoration, SR
100027 (Main Street) from Lynn Street to
11the Venango County Line, Oil Creek
12Township, City of Titusville, Project
13ID 98902

 

14Project Allocation

400,000

15(Base Project Allocation - $350,000)

 

16(Design & Contingencies - $50,000)

 

17(58) SR 0008, Resurface/Restoration, SR
180008 (Spring Street) from Franklin
19Street to Skyline Drive, Oil Creek
20Township, City of Titusville, Project
21ID 98679

 

22Project Allocation

916,000

23(Base Project Allocation - $865,000)

 

24(Design & Contingencies - $51,000)

 

25(59) SR 0018, Resurface/Restoration, SR
260018 (Water Street/Main Street) from
27the Summerhill Township Line to
28Springboro Road, Conneautville Borough
29Summerhill Township, Project ID 98720

 

30Project Allocation

831,000

1(Base Project Allocation - $781,000)

 

2(Design & Contingencies - $50,000)

 

3(60) SR 2022, Resurface/Restoration, SR
42022 (North Franklin Street) from SR
50322 to SR 0173, Cochranton Borough,
6East Fairfield Township, Project ID
798829

 

8Project Allocation

534,000

9(Base Project Allocation - $484,000)

 

10(Design & Contingencies - $50,000)

 

11(61) SR 0408, Resurface/Restoration, SR
120408 (Main Street) from SR 1018, (Guys
13Mills Road) to the Troy Township Line,
14Townville Borough, Project ID 98593

 

15Project Allocation

250,000

16(Base Project Allocation - $200,000)

 

17(Design & Contingencies - $50,000)

 

18(62) SR 0285, Resurface, SR 0285 (Third 
19Street), from SR 0006 to Lake Road, 
20East Fallowfield Township, Sadsbury 
21Township, Project ID 99614

 

22Project Allocation

570,000

23(Base Project Allocation - $570,000)

 

24(63) SR 1026, Resurface, SR 1026 (Danner
25Drive) from SR 1039 to SR 1024,
26Bloomfield Township, Project ID 99643

 

27Project Allocation

96,000

28(Base Project Allocation - $96,000)

 

29(64) SR 0079, Resurface, I-79 (Raymond P.
30Shafer Highway) from the Saegertown

 

1Exit to the Erie County Line,
2Cussewago and Hayfield Townships,
3Project ID 99642

 

4Project Allocation

8,033,000

5(Base Project Allocation - $7,833,000)

 

6(Design & Contingencies - $200,000)

 

7(65) SR 0027, Resurface, SR 0027 from
8Townline Road to Brookdale Drive, East
9Mead Township, Project ID 99641

 

10Project Allocation

950,000

11(Base Project Allocation - $950,000)

 

12(66) SR 0322, Resurface, SR 0322 (28th
13Division Highway) from the West Mead
14Township Line to the Cochranton
15Borough Line, East Fairfield, East
16Fallowfield and West Mead Townships,
17Project ID 99640

 

18Project Allocation

1,100,000

19(Base Project Allocation - $1,100,000)

 

20(67) SR 1035, Resurface, SR 1035 (Mackey
21Hill Road) from Miller Station Road to
22the Erie County Line, Rockdale
23Township, Project ID 99639

 

24Project Allocation

900,000

25(Base Project Allocation - $900,000)

 

26(68) SR 0408, Resurface, SR 0408 (Church
27Street) from SR 1014 to Henry Road,
28Rockdale Township, Project ID 99638

 

29Project Allocation

1,500,000

30(Base Project Allocation - $1,500,000)

 

1(69) SR 3018, Resurface/Restoration, SR
23018 (Erie Street) from Erie Street
3Extension to the Pine Township Line,
4Linesville Borough, Project ID 98759

 

5Project Allocation

248,000

6(Base Project Allocation - $197,000)

 

7(Design & Contingencies - $51,000)

 

8(70) SR 2024, Resurface, SR 2024 (Bloss
9Street) from Drake Street to Drake
10Well, City of Titusville, Project ID
1199635

 

12Project Allocation

250,000

13(Base Project Allocation - $250,000)

 

14(71) SR 1024, Resurface, SR 1024 (Lake
15Road) from SR 1039 to SR 0008,
16Bloomfield Township, Project ID 99644

 

17Project Allocation

629,000

18(Base Project Allocation - $629,000)

 

19(72) SR 0408, Resurface, SR 0408 from SR
200077 to Guys Mills Road, Richmond and
21Steuben Townships, Townsville Borough,
22Project ID 99619

 

23Project Allocation

1,325,000

24(Base Project Allocation - $1,325,000)

 

25(73) SR 0408, Resurface, SR 0408 from
26Shriner Road to the Hydetown Borough
27Line, Hydetown Borough, Oil Creek and
28Troy Townships, Project ID 99637

 

29Project Allocation

1,500,000

30(Base Project Allocation - $1,500,000)

 

1(74) SR 0285, Resurface, SR 0285 (Lake
2Road) from SR 3019 to SR 0019 (Perry
3Highway) with Railroad Flagging for
4Norfolk Southern Corporation (DOT
5#262767l), East Fallowfield and
6Greenwood Townships, Project ID 99606

 

7Project Allocation

1,098,000

8(Base Project Allocation - $1,098,000)

 

9(75) SR 2012, Resurface, SR 2012 (Alden
10Street) from Porter Street to Barton
11Road, City of Meadville, West Mead
12Township, Project ID 99605

 

13Project Allocation

620,000

14(Base Project Allocation - $620,000)

 

15(76) SR 0322, Restoration, SR 0322 (28th
16Division Highway) from Pine Road to SR
170006 (Water Street), Conneaut Lake
18Borough, East Fallowfield and Sadsbury
19Townships, Project ID 99603

 

20Project Allocation

1,855,000

21(Base Project Allocation - $1,855,000)

 

22(77) SR 2031, Resurface/Restoration, SR
232031 (Perry Street) from SR 0089 to
24Warner Road, Oil Creek Township, City
25of Titusville, Project ID 98731

 

26Project Allocation

36,000

27(Base Project Allocation - $36,000)

 

28(78) SR 0018, Resurface/Restoration, SR
290018 (Main Street/Springboro Road)
30from the Springboro Line to the Erie

 

1County Line, Spring Township,
2Springboro Borough, Project ID 98899

 

3Project Allocation

1,977,000

4(Base Project Allocation - $1,876,000)

 

5(Design & Contingencies - $101,000)

 

6(79) SR 0027, Resurface/Restoration, SR
70027 (Washington Street) from State
8Street to Morgan Street, City of
9Meadville, Project ID 98901

 

10Project Allocation

261,000

11(Base Project Allocation - $211,000)

 

12(Design & Contingencies - $50,000)

 

13(80) SR 0079, Resurface/Restoration, I-79
14(Raymond P. Shafer Highway) from the
15Geneva Exit to the Meadville Exit,
16Greenwood, Union and Vernon Townships,
17Project ID 99097

 

18Project Allocation

4,000,000

19(Base Project Allocation - $3,900,000)

 

20(Design & Contingencies - $100,000)

 

21(81) SR 0079, Resurface/Restoration, I-79
22(Raymond P. Shafer Highway), at the
23Meadville Interchange, Vernon
24Township, Project ID 99092

 

25Project Allocation

1,300,000

26(Base Project Allocation - $1,200,000)

 

27(Design & Contingencies - $100,000)

 

28(82) SR 0006, Resurface/Restoration, SR
290006 from Venango Avenue to the
30Cambridge Springs Borough Line,

 

1Cambridge Springs Borough, Project ID
298875

 

3Project Allocation

634,000

4(Base Project Allocation - $583,000)

 

5(Design & Contingencies - $51,000)

 

6(83) SR 2012, Resurface/Restoration, SR
72012 (Hunter Road) from the Top of
8Hunter Hill to Waylon Road, East Mead
9and West Mead Townships, Project ID
1098751

 

11Project Allocation

1,254,000

12(Base Project Allocation - $1,154,000)

 

13(Design & Contingencies - $100,000)

 

14(84) SR 0027, Resurface, SR 0027 from the
15Meadville City Line to Townline Road,
16West Mead Township, Project ID 99658

 

17Project Allocation

491,000

18(Base Project Allocation - $491,000)

 

19(85) SR 0027, Resurface, SR 0027
20(Washington Street) from Morgan Street
21to the Meadville City Line, City of
22Meadville, Project ID 99657

 

23Project Allocation

82,000

24(Base Project Allocation - $82,000)

 

25(86) SR 0018, Resurface/Restoration, SR
260018 from SR 3016 to the Conneautville
27Borough Line, Conneautville Borough,
28Summerhill and Summit Townships,
29Project ID 98746

 

30Project Allocation

3,783,000

1(Base Project Allocation - $3,682,000)

 

2(Design & Contingencies - $101,000)

 

3(87) SR 0077, Resurface, SR 0077 from 0.5
4Mile North of SR 0408 to the end of
5Segment 0300, Richmond Township,
6Project ID 99654

 

7Project Allocation

116,000

8(Base Project Allocation - $116,000)

 

9(88) SR 0077, Resurface, SR 0077 from SR
101033 to Segment 0280, Richmond
11Townships, Project ID 99653

 

12Project Allocation

193,000

13(Base Project Allocation - $193,000)

 

14(89) SR 2033, Resurface/Restoration, SR
152033 (Brook Street/Spring Creek Road)
16from SR 0089 to the Warren County
17Line, Oil Creek and Rome Townships,
18City of Titusville, Project ID 98739

 

19Project Allocation

1,540,000

20(Base Project Allocation - $1,439,000)

 

21(Design & Contingencies - $101,000)

 

22(90) SR 0008, Resurface, SR 0008 (Spring
23Street) from SR 1024 to the Erie
24County Line, Bloomfield Township,
25Project ID 99645

 

26Project Allocation

1,358,000

27(Base Project Allocation - $1,358,000)

 

28(91) SR 1037, Resurface, SR 1037 (Little
29Cooley Road) from SR 0077 to SR 1039,
30Athens and Bloomfield Townships,

 

1Project ID 99650

 

2Project Allocation

1,061,000

3(Base Project Allocation - $1,061,000)

 

4(92) SR 3013, Resurface, SR 3013 (Lake
5Road) from SR 3006 to SR 0322 with
6Railroad Flagging for Norfolk Southern
7Corporation (DOT #262743x), East
8Fallowfield and Sadsbury Townships,
9Project ID 99649

 

10Project Allocation

1,232,000

11(Base Project Allocation - $1,232,000)

 

12(93) Various, Curb Cut Ramps, Various
13Routes, City of Meadville, Project ID
1486952

 

15Project Allocation

150,000

16(Base Project Allocation - $150,000)

 

17Section 321. Cumberland County.

18Projects are as follows:

 

19(1) (Reserved).

 

20(2) SR 0011, Safety Improvements, SR 0011
21from SR 0581 to SR 0114, Hampden and
22Silver Spring Townships, Project ID
2389130

 

24Project Allocation

3,500,000

25(Base Project Allocation - $3,500,000)

 

26(3) SR 0114, Resurface, PA 114 from PA
27641 (Main Street), to US 15 and SR
282011 from PA 114 (Market Street) to SR
292013 (York Street), Mechanicsburg
30Borough, Upper Allen Township, Project

 

1ID 97279

 

2Project Allocation

479,000

3(Base Project Allocation - $453,000)

 

4(Design & Contingencies - $26,000)

 

5(4) SR 2016, Resurface, SR 2016, SR 2017,
6SR 2021, SR 2025 and SR 2027, Camp
7Hill Borough, Lower Allen Township,
8Project ID 96458

 

9Project Allocation

500,000

10(Base Project Allocation - $500,000)

 

11(5) SR 0641, Turn Lanes, Signal Timing
12and Update Pedestrian Access,
13Intersection of PA 641 (Trindle Road)
14and SR 2029 (Saint Johns Church Road),
15Hampden Township, Project ID 94913

 

16Project Allocation

372,000

17(Base Project Allocation - $241,000)

 

18(Land Allocation - $40,000)

 

19(Design & Contingencies - $91,000)

 

20(6) SR 2021, Resurface, SR 2021 (Wesley
21Drive) from Colonial Road PA 641
22(Trindle Road), Hampden and Lower
23Allen Townships, Project ID 82425

 

24Project Allocation

2,391,000

25(Base Project Allocation - $2,260,000)

 

26(Land Allocation - $20,000)

 

27(Design & Contingencies - $111,000)

 

28(7) SR 1013, Betterment/Resurface, SR
291013 (Good Hope Road) from PA 641
30(Trindle Road) to Bridge over

 

1Northbound I-81, Hampden Township,
2Project ID 90868

 

3Project Allocation

263,000

4(Base Project Allocation - $141,000)

 

5(Land Allocation - $21,000)

 

6(Design & Contingencies - $101,000)

 

7(8) SR 0696, Resurface, PA 696 (Turnpike
8Road/North Mountain Road) from SR 4033
9(Lovers Lane) to PA 997 (Enola Road),
10Hopewell Township, Newburg Borough,
11Project ID 82418

 

12Project Allocation

428,000

13(Base Project Allocation - $366,000)

 

14(Land Allocation - $11,000)

 

15(Design & Contingencies - $51,000)

 

16(9) SR 0011, Resurface, Mill and Nova
17Chip, Camp Hill Bypass from Harvey
18Taylor Bridge to 21st Street and US
1911/15 from 21st Street to Harvard
20Street, Camp Hill Borough, East
21Pennsboro Township, Wormleysburg
22Borough, Project ID 88315

 

23Project Allocation

431,000

24(Base Project Allocation - $211,000)

 

25(Land Allocation - $20,000)

 

26(Design & Contingencies - $200,000)

 

27(10) I-81, Highway Reconstruction, I-81
28from PA 74 to South of PA 233, Penn,
29Dickson and South Middleton Townships,
30Carlisle Borough, Project ID 92690

 

1Project Allocation

645,000

2(Base Project Allocation - $625,000)

 

3(Design & Contingencies - $20,000)

 

4(11) I-83, Highway Reconstruction with
5Bridge Replacement, I-83, PA 581 and
6SR 2028 Interchange, Lower Allen
7Township, Lemoyne and New Cumberland
8Boroughs, Project ID 89177

 

9Project Allocation

1,981,000

10(Base Project Allocation - $1,646,000)

 

11(Land Allocation - $140,000)

 

12(Design & Contingencies - $195,000)

 

13(12) SR 0034, Resurface, PA 34 (Carlisle
14Springs Road), from US 11 (Hanover
15Street) to Sterretts Gap Avenue,
16Carlisle Borough, North Middleton
17Township, Project ID 82414

 

18Project Allocation

188,000

19(Base Project Allocation - $116,000)

 

20(Land Allocation - $21,000)

 

21(Design & Contingencies - $51,000)

 

22(13) SR 0011, Safety Improvements, SR
230011/SR 1010 from SR 0114 to SR
240011/SR 0015, SR 0114 from SR 0011 to
25Willow Mill Road, SR 0011/SR 0015 from
26SR 0581 to 21st Street, Camp Hill
27Borough, East Pennsboro, Hampden and
28Silver Spring Townships, Project ID
2989102

 

30Project Allocation

765,000

1(Base Project Allocation - $765,000)

 

2(14) SR 0081, Interchange Improvements,
3I-81 Exit 29, PA 174 (Walnut Bottom
4Road), Shippensburg and Southampton
5Townships, Project ID 92940

 

6Project Allocation

33,002,000

7(Base Project Allocation -
8$32,801,000)

 

9(Design & Contingencies - $201,000)

 

10(15) SR 2029, Safety Improvement,
11Intersection of SR 2029 (Saint Johns
12Church Road) and Industrial Road,
13Hampden Township, Project ID 94914

 

14Project Allocation

1,000,000

15(Base Project Allocation - $750,000)

 

16(Design & Contingencies - $250,000)

 

17(16) SR 0581, Diamond Grinding
18Resurfacing, PA 581 from I-81 to US
1911/15, East Pennsboro and Hampden
20Townships, Project ID 88314

 

21Project Allocation

544,000

22(Base Project Allocation - $524,000)

 

23(Design & Contingencies - $20,000)

 

24(17) SR 0011, Resurface, US 11 from Penn
25Street to PA Turnpike Ramps at Miracle
26Mile, Carlisle Borough, Middlesex and
27North Middleton Townships, Project ID
2882412

 

29Project Allocation

233,000

30(Base Project Allocation - $198,000)

 

1(Land Allocation - $5,000)

 

2(Design & Contingencies - $30,000)

 

3(18) SR 0114, Safety Improvement, SR
40114, SR 0233, SR 0696, SR 0944, SR
51007, SR 2011, SR 8033 Corridors, East
6Pennsboro, Hampden, Hopewell, Monroe,
7Penn, Silver Spring, Upper Allen and
8West Pennsboro Townships, Project ID
997030

 

10Project Allocation

96,000

11(Base Project Allocation - $71,000)

 

12(Design & Contingencies - $25,000)

 

13(19) SR 0034, Resurface/Betterment, PA 34
14(Carlisle Road) from Adams County Line
15to South of Mount Holly Springs
16Borough, Dickinson and South Middleton
17Townships, Project ID 90876

 

18Project Allocation

440,000

19(Base Project Allocation - $230,000)

 

20(Land Allocation - $10,000)

 

21(Design & Contingencies - $200,000)

 

22(20) SR 0533, Resurface, PA 533 from PA
23233 to South of Newville Borough Line,
24Newville Borough, North Newton
25Township, Project ID 96229

 

26Project Allocation

800,000

27(Base Project Allocation - $750,000)

 

28(Design & Contingencies - $50,000)

 

29(21) SR 0081, Resurface, I-81 from PA 233
30(Centerville Road) to East of PA 34

 

1(Hanover Street/Holly Pike), Carlisle
2Borough, Dickinson, Penn and South
3Middleton Townships, Project ID 91015

 

4Project Allocation

18,159,000

5(Base Project Allocation -
6$17,846,000)

 

7(Design & Contingencies - $313,000)

 

8(22) I-81, Highway Reconstruction, I-81
9from North of US 11 to East of PA 114,
10Middlesex and Silver Spring Townships,
11Project ID 91013

 

12Project Allocation

2,935,000

13(Base Project Allocation - $2,735,000)

 

14(Design & Contingencies - $200,000)

 

15(23) I-81, Highway Reconstruction with
16Bridge Preservation, I-81 from PA 34
17Interchanges to US 11 Interchanges,
18Middlesex and South Middleton
19Townships, Carlisle Borough, Project
20ID 92149

 

21Project Allocation

781,000

22(Base Project Allocation - $708,000)

 

23(Design & Contingencies - $73,000)

 

24(24) I-81, Highway Reconstruction, I-81
25from North of Exit 52 to Susquehanna
26River Bridge, East Pennsboro, Hampden,
27Middlesex and Silver Spring Townships,
28Project ID 92150

 

29Project Allocation

210,000

30(Base Project Allocation - $190,000)

 

1(Design & Contingencies - $20,000)

 

2(25) I-81, Highway Reconstruction, I-81
3from Franklin County Line to PA 233,
4Penn, Shippensburg, South Newton and
5Southampton Townships, Project ID
692152

 

7Project Allocation

720,000

8(Base Project Allocation - $700,000)

 

9(Design & Contingencies - $20,000)

 

10(26) SR 0641, Resurface, PA 641 from
11Cemetery Road to Laughlin Mill Road,
12Newville Borough, North Newton
13Township, Project ID 96224

 

14Project Allocation

95,000

15(Base Project Allocation - $95,000)

 

16(27) SR 0233, Resurface, PA 233 from West
17Pennsboro Township Line to Bridge over
18I-76, Lower Mifflin Township, Newville
19Borough, North Newton Township,
20Project ID 96225

 

21Project Allocation

1,200,000

22(Base Project Allocation - $1,200,000)

 

23(28) SR 2013, Resurface, SR 2013 (York
24Street) from PA 641 (Main Street) to
25Gettysburg Pike, Mechanicsburg
26Borough, Upper Allen Township, Project
27ID 96226

 

28Project Allocation

1,126,000

29(Base Project Allocation - $1,101,000)

 

30(Design & Contingencies - $25,000)

 

1(29) I-81, Highway Reconstruction with
2Bridge Preservation, I-81 from US 11
3Exit 52 to Simmons Run Bridge,
4Middlesex and Silver Spring Townships,
5Project ID 92163

 

6Project Allocation

350,000

7(Base Project Allocation - $330,000)

 

8(Design & Contingencies - $20,000)

 

9(30) SR 1021, Resurface, SR 1021 (Central
10Boulevard), SR 2014 (Main Street), SR
112025 (Railroad Avenue/South Locust
12Street/Slate Hill Road) and SR 2029
13(Saint Johns Church Road), Hampden and
14Lower Allen Townships, Shiremanstown
15Borough, Project ID 96449

 

16Project Allocation

676,000

17(Base Project Allocation - $626,000)

 

18(Design & Contingencies - $50,000)

 

19(31) SR 2023, Resurface, SR 2023
20(Shepherdstown Road) from PA 114
21(Market Street) to SR 2014 (Simpson
22Street), Mechanicsburg Borough, Upper
23Allen Township, Project ID 96228

 

24Project Allocation

125,000

25(Base Project Allocation - $99,000)

 

26(Design & Contingencies - $26,000)

 

27(32) SR 0081, Safety Improvements, I-81
28from PA 581 Exit Ramp to PA 114 Merge
29Ramp, Hampden and Silver Spring
30Townships, Project ID 90207

 

1Project Allocation

16,719,000

2(Base Project Allocation -
3$11,019,000)

 

4(Design & Contingencies - $5,700,000)

 

5(33) SR 0233, Highway Portion Bridge
6Replacement, PA 233 (Doubling Gap
7Road) over Conodoguinet Creek, Lower
8Mifflin and North Newton Townships,
9Project ID 89274

 

10Project Allocation

791,000

11(Base Project Allocation - $789,000)

 

12(Land Allocation - $1,000)

 

13(Design & Contingencies - $1,000)

 

14(34) SR 0944, Highway Portion Bridge
15Replacement, PA 944 (Enola Road)
16Bridge over Bloser Creek, Upper
17Frankford Township, Project ID 87419

 

18Project Allocation

133,000

19(Base Project Allocation - $133,000)

 

20(35) SR 0011, Highway Portion Bridge
21Replacement, US 11 over Letort Spring
22Creek, Middlesex Township, Project ID
2390694

 

24Project Allocation

1,928,000

25(Base Project Allocation - $1,928,000)

 

26(36) SR 2033, Highway Portion Bridge
27Replacement, SR 2033 (Creek Road) over
28Cedar Run, Lower Allen Township,
29Project ID 87413

 

30Project Allocation

391,000

1(Base Project Allocation - $391,000)

 

2(37) SR 3006, Highway Portion Bridge
3Replacement, SR 3006 (Pine Road) over
4Yellow Breaches Creek, Penn Township,
5Project ID 87659

 

6Project Allocation

170,000

7(Base Project Allocation - $170,000)

 

8(38) SR 0997, Highway Portion Bridge
9Replacement, SR 0997, Roxbury Road
10over Whiskey Creek, Upper Mifflin
11Township, Project ID 90346

 

12Project Allocation

190,000

13(Base Project Allocation - $190,000)

 

14(39) SR 0114, Construct Park and Ride
15Lot, Lot on East Side of PA 114 North
16of I-81, Silver Spring Township,
17Project ID 94326

 

18Project Allocation

188,000

19(Base Project Allocation - $183,000)

 

20(Land Allocation - $5,000)

 

21(40) SR 0034, Highway Portion Bridge
22Replacement, PA 34 (Carlisle Road)
23Bridge over Hunters Run, South
24Middleton Township, Project ID 87424

 

25Project Allocation

165,000

26(Base Project Allocation - $165,000)

 

27(41) I-81, Highway Reconstruction, I-81
28from Simmons Run Bridge to George Wade
29Bridge, East Pennsboro, Hampden and
30Silver Spring Townships, Project ID

 

192178

 

2Project Allocation

870,000

3(Base Project Allocation - $850,000)

 

4(Design & Contingencies - $20,000)

 

5(42) SR 0034, Highway Portion Bridge
6Preservation, PA 34 Bridge over
7Mountain Creek, Mount Holly Springs
8Borough, Project ID 99715

 

9Project Allocation

1,040,000

10(Base Project Allocation - $1,040,000)

 

11(43) I-83, Reconstruction, I-83 from the
12York County Line to the Dauphin County
13Line, Various Municipalities, Project
14ID 0

 

15Project Allocation

9,600,000

16(Base Project Allocation - $9,600,000)

 

17(44) I-81, Reconstruction, I-81 from the
18Franklin County Line to the Dauphin
19County Line, Various Municipalities,
20Project ID 0

 

21Project Allocation

156,600,000

22(Base Project Allocation -
23$156,600,000)

 

24(45) SR 0011, Resurface, US 11 from PA
25533 to Smith Road, North Newton and
26Penn Townships, Shippensburg Borough,
27Shippensburg, South Newton,
28Southampton and West Pennsboro
29Townships, Project ID 101266

 

30Project Allocation

5,000,000

1(Base Project Allocation - $5,000,000)

 

2Section 322. Dauphin County.

3Projects are as follows:

 

4(1) (Reserved).

 

5(2) SR 0325, Resurface and Betterment, PA
6325, (Clarks Valley Road) from PA 225,
7(Peters Mountain Road) to West of Rush
8Township Line, Middle Paxton Township,
9Project ID 90888

 

10Project Allocation

852,000

11(Base Project Allocation - $722,000)

 

12(Land Allocation - $20,000)

 

13(Design and Contingencies - $110,000)

 

14(3) SR 0322, Ramp Extension, US-322
15between PA 39, (Hershey Cloverleaf)
16and SR 2005, Waltonville Road, Derry
17Township, Hummelstown Borough, Project
18ID 96198

 

19Project Allocation

5,000,000

20(Base Project Allocation - $3,700,000)

 

21(Land Allocation - $400,000)

 

22(Design and Contingencies - $900,000)

 

23(4) SR 1017, Highway Portion Bridge
24Replacement, SR 1017, (Honeymoon
25Trail) over Tributary of Pine Creek,
26Lykens Township, Project ID 87459

 

27Project Allocation

207,000

28(Base Project Allocation - $207,000)

 

29(5) Industrial Road, Resurface Industrial
30Road from Cameron Street to

 

1Linglestown Road, City of Harrisburg,
2Project ID 97260

 

3Project Allocation

700,000

4(Base Project Allocation - $700,000)

 

5(6) SR 0230, Highway Portion Bridge
6Replacement, PA 230, (Cameron Street)
7Bridge over Asylum Run, City of
8Harrisburg, Project ID 87454

 

9Project Allocation

149,000

10(Base Project Allocation - $149,000)

 

11(7) SR 0743, Highway Portion Bridge
12Replacement, PA 743 (Park Avenue
13Bridge) over Spring Creek, Derry
14Township, Project ID 87455

 

15Project Allocation

189,000

16(Base Project Allocation - $127,000)

 

17(Design & Contingencies - $62,000)

 

18(8) I-81, Highway Reconstruction, I-81
19from Susquehanna River Bridge to One
20Mile East of I-83 Exit 70, Susquehanna
21and Lower Paxton Townships, City of
22Harrisburg, Project ID 92157

 

23Project Allocation

245,000

24(Base Project Allocation - $225,0000)

 

25(Design & Contingencies - $20,000)

 

26(9) SR 0283, Interchange Improvements, I-
27283 and PA Turnpike Interchange, Lower
28Swatara and Swatara Townships, Project
29ID 84548

 

30Project Allocation

3,653,000

1(Base Project Allocation - $2,001,000)

 

2(Land Allocation - $51,000)

 

3(Design & Contingencies - $1,601,000)

 

4(10) I-81, Highway Reconstruction, I-81
5from Colonial Road to Lebanon County
6Line, East Hanover, Lower Paxton and
7West Hanover Townships, Project ID
892180

 

9Project Allocation

395,000

10(Base Project Allocation - $375,000)

 

11(Design & Contingencies - $20,000)

 

12(11) SR 0743, Resurface, PA 743 (Cocoa
13Avenue/Park Avenue/Sand Beach Road)
14from Valley Road to Hershey Park
15Drive, Derry Township, Project ID
1682439

 

17Project Allocation

731,000

18(Base Project Allocation - $700,000)

 

19(Land Allocation - $5,000)

 

20(Design & Contingencies - $26,000)

 

21(12) SR 4004, Highway Portion Bridge
22Replacement, SR 4004 (Rutter Road)
23Bridge over Armstrong Creek, Jackson
24Township, Project ID 87457

 

25Project Allocation

570,000

26(Base Project Allocation - $570,000)

 

27(13) SR 0022, Concrete Patching and
28Grinding, US 22/322 from Clarks Ferry
29Bridge to Front Street, Dauphin
30Borough, Middle Paxton and Reed

 

1Townships, Project ID 88316

 

2Project Allocation

2,611,000

3(Base Project Allocation - $2,400,000)

 

4(Land Allocation - $10,000)

 

5(Design & Contingencies - $201,000)

 

6(14) SR 0083, Reconstruction and
7Widening, I-83 from Susquehanna River
8to SR 3013 (29th Street), City of
9Harrisburg, Swatara Township, Project
10ID 97828

 

11Project Allocation

45,500,000

12(Base Project Allocation -
13$40,000,000)

 

14(Land Allocation - $2,700,000)

 

15(Design & Contingencies - $2,800,000)

 

16(15) SR 0225, Resurfacing and Betterment,
17PA 225 (Peters Mountain Road) from PA
18325 (Clarks Valley Road) to PA 147
19(South River Road), Halifax and Middle
20Paxton Townships, Project ID 90890

 

21Project Allocation

714,000

22(Base Project Allocation - $492,000)

 

23(Land Allocation - $21,000)

 

24(Design & Contingencies - $201,000)

 

25(16) SR 3013, Resurface, SR 3013 (29th
26Street) from Walnut Street to Sycamore
27Street, City of Harrisburg, Paxtang
28and Penbrook Boroughs, Susquehanna and
29Swatara Townships, Project ID 82449

 

30Project Allocation

178,000

1(Base Project Allocation - $107,000)

 

2(Land Allocation - $11,000)

 

3(Design & Contingencies - $60,000)

 

4(17) I-83, Interchange Improvement, Union
5Deposit Interchange, Lower Paxton
6Township, Project ID 93048

 

7Project Allocation

63,484,000

8(Base Project Allocation -
9$63,484,000)

 

10(18) SR 0022, Safety Improvement, SR
110022, I-81, SR 0225, SR 0230, SR 2011,
12SR 8003 and SR 8028 Corridors, Derry,
13East Hanover, Halifax, Londonderry,
14Middle Paxton, Reed, Susquehanna,
15Swatara and West Hanover Townships,
16Project ID 97030

 

17Project Allocation

96,000

18(Base Project Allocation - $71,000)

 

19(Design & Contingencies - $25,000)

 

20(19) I-83, Interchange Improvement,
21Colonial Park Interchange, Lower
22Paxton Township, Project ID 93046

 

23Project Allocation

82,127,000

24(Base Project Allocation -
25$82,127,000)

 

26(20) SR 0441, Highway Portion Bridge
27Replacement, PA 441 (Canal Street)
28over Tributary of Susquehanna River
29Royalton Borough, Project ID 87456

 

30Project Allocation

230,000

1(Base Project Allocation - $230,000)

 

2(21) SR 3006, Resurface, SR 3006 (Pine
3Street) from PA 230 (Front Street) to
4Orchard Drive, Steelton Borough and
5Swatara Township, Project ID 96286

 

6Project Allocation

104,000

7(Base Project Allocation - $79,000)

 

8(Land Allocation - $5,000)

 

9(Design & Contingencies - $20,000)

 

10(22) SR 3012, Rehabilitation and
11Resurface, SR 3012 (Derry Street) from
12SR 3013 (29th Street) to Wilhelm Road,
13Paxtang Borough and Swatara Township,
14Project ID 96303

 

15Project Allocation

502,000

16(Base Project Allocation - $501,000)

 

17(Design & Contingencies - $1,000)

 

18(23) SR 0325, Resurface and Betterment,
19PA 325 (Clarks Valley Road) from
20Beginning of Dauphin Reservoir to 3.5
21Miles Southwest of Reservoir, Middle
22Paxton and Rush Townships, Project ID
2390883

 

24Project Allocation

3,108,000

25(Base Project Allocation - $3,108,000)

 

26(24) SR 0147, Resurface, PA 147 (South
27River Road) from US 22 to PA 225
28(Peters Mountain Road), Halifax and
29Reed Townships, Project ID 96301

 

30Project Allocation

3,425,000

1(Base Project Allocation - $3,325,000)

 

2(Design & Contingencies - $100,000)

 

3(25) SR 8009, Rehabilitation and
4Resurface, SR 8009, I-81 Exit 72
5Ramps, Lower Paxton Township, Project
6ID 96296

 

7Project Allocation

752,000

8(Base Project Allocation - $751,000)

 

9(Design & Contingencies - $1,000)

 

10(26) SR 3009, Resurface, SR 3009 (Front
11Street) Division Street to Vine
12Street, SR 3009 (Paxton Street) Vine
13Street to Cameron Street, City of
14Harrisburg, Project ID 96287

 

15Project Allocation

392,000

16(Base Project Allocation - $340,000)

 

17(Land Allocation - $26,000)

 

18(Design & Contingencies - $26,000)

 

19(27) SR 2036, Rehabilitation and
20Resurface, SR 2036 (Hershey Park
21Drive) from PA 743 (Laudermilch Road)
22to North Lingle Avenue, Derry
23Township, Project ID 96752

 

24Project Allocation

2,503,000

25(Base Project Allocation - $2,001,000)

 

26(Land Allocation - $101,000)

 

27(Design & Contingencies - $401,000)

 

28(28) SR 0225, Rehabilitation and
29Resurface, PA 225 (Armstrong Valley
30Road) from PA 147 (Second Street) to

 

1Terry Lane, Halifax Borough and
2Halifax Township, Project ID 96304

 

3Project Allocation

1,101,000

4(Base Project Allocation - $1,100,000)

 

5(Design & Contingencies - $1,000)

 

6(29) Park Boulevard, New Roadway, Park
7Boulevard between Intersection with
8Ridge Road and Reconnecting with the
9Existing Park Boulevard Roadway in the
10Area of the Hersheypark Parking Lots,
11Derry Township, Project ID 92843

 

12Project Allocation

651,000

13(Design & Contingencies - $651,000)

 

14(30) SR 3026, Rehabilitation and
15Resurface, SR 3026 (Elmerton Avenue)
16from US 22 to Bumberger Road and from
17SR 3015 (North Progress Avenue) to
18West of Susan Way, Susquehanna
19Township, Project ID 96302

 

20Project Allocation

302,000

21(Base Project Allocation - $301,000)

 

22(Design & Contingencies - $1,000)

 

23(31) SR 3007, Resurface, SR 3007 South
2419th Street from SR 3006 (Pine Street)
25to SR 3012 (Derry Street), City of
26Harrisburg, Steelton Borough and
27Swatara Township, Project ID 96285

 

28Project Allocation

281,000

29(Base Project Allocation - $240,000)

 

30(Land Allocation - $15,000)

 

1(Design & Contingencies - $26,000)

 

2(32) SR 0322, Intersection Improvements,
3Intersection of US 322 (Paxton
4Street), SR 2019 (Grayson Road) and SR
53006 (Chambers Hill Road), Swatara
6Township, Project ID 92945

 

7Project Allocation

1,300,000

8(Base Project Allocation - $1,300,000)

 

9(33) I-283, Highway Reconstruction, I-283
10from PA Turnpike to I-83, Swatara and
11Lower Swatara Townships, Project ID
1291011

 

13Project Allocation

3,850,000

14(Base Project Allocation - $3,500,000)

 

15(Design & Contingencies - $350,000)

 

16(34) SR 3020, Corridor Safety
17Improvements, SR 3020 (Union Deposit
18Road) from Powers Avenue to East Park
19Drive, Lower Paxton and Susquehanna
20Townships, Project ID 94759

 

21Project Allocation

141,000

22(Base Project Allocation - $41,000)

 

23(Design & Contingencies - $100,000)

 

24(35) SR 0022, Safety Improvement, SR 0022
25and SR 0230 from Sycamore Street to
26Elmerton Avenue, City of Harrisburg
27and Susquehanna Township, Project ID
2897407

 

29Project Allocation

136,000

30(Base Project Allocation - $36,000)

 

1(Design & Contingencies - $100,000)

 

2(36) SR 0083, Interchange Reconstruction,
3Eisenhower Interchange, I-83, I-283
4and US 322, Lower Paxton and Swatara
5Townships, Project ID 92931

 

6Project Allocation

55,565,000

7(Base Project Allocation -
8$43,410,000)

 

9(Land Allocation - $7,548,000)

 

10(Design & Contingencies - $4,607,000)

 

11(37) SR 0011, Safety Improvement, SR 3014
12from 13th Street to Herr Street, US 22
13from Herr Street to Shannon Drive,
14City of Harrisburg, Lower Paxton
15Township, Penbrook Borough,
16Susquehanna Township, Project ID 89102

 

17Project Allocation

765,000

18(Base Project Allocation - $765,000)

 

19(38) SR 0743, Rehabilitation and
20Resurface, PA 743 (Hersheypark
21Drive/Laudermilch Road) from Police
22Academy Drive to North of Swatara
23Road, Derry Township, Project ID 96753

 

24Project Allocation

1,501,000

25(Base Project Allocation - $1,250,000)

 

26(Land Allocation - $50,000)

 

27(Design & Contingencies - $201,000)

 

28(39) SR 2018, Mill & Resurface, SR 2018 
29(Main St) from US 322 to Derry 
30Township Line, Hummelstown Borough and
 

 

1Swatara Township, Project ID 93491

 

2Project Allocation

339,000

3(Base Project Allocation - $299,000)

 

4(Land Allocation - $10,000)

 

5(Design & Contingencies - $30,000)

 

6(40) SR 0081, Congestion Reduction and 
7Safety Improvements, Add Merge Lane, 
8I-81/I-83 Northbound Merge to Mountain 
9Road, Lower Paxton Township, Project
10ID 90204

 

11Project Allocation

21,851,000

12(Base Project Allocation -
13$16,808,000)

 

14(Design & Contingencies - $5,043,000)

 

15(41) SR 0022, Intersection Safety
16Improvements, Intersection of US 22
17and PA 39, West Hanover Township,
18Project ID 94724

 

19Project Allocation

463,000

20(Base Project Allocation - $454,000)

 

21(Land Allocation - $9,000)

 

22(42) SR 0022, Resurfacing and Base 
23Repair, US 22/322 from North Front 
24Street to Elmerton Avenue, City of 
25Harrisburg, Middle Paxton and 
26Susquehanna Townships, Project ID 
2797254

 

28Project Allocation

2,000,000

29(Base Project Allocation - $2,000,000)

 

30(43) SR 3012, Highway Portion Bridge

 

1Rehabilitation, SR 3012 (Market
2Street) West Span Bridge over
3Susquehanna River, City of Harrisburg,
4Project ID 93176

 

5Project Allocation

512,000

6(Base Project Allocation - $512,000)

 

7(44) SR 0230, Rehabilitation and
8Resurface, PA 230 (E Harrisburg Pike)
9from Swatara Creek Road to County
10Line, Londonderry Township, Project ID
1196305

 

12Project Allocation

2,402,000

13(Base Project Allocation - $2,401,000)

 

14(Design & Contingencies - $1,000)

 

15(45) SR 0022, Highway Portion Bridge
16Preservation, US 22 Clarks Ferry
17Bridge over Susquehanna River, Reed
18Township, Project ID 93178

 

19Project Allocation

869,000

20(Base Project Allocation - $743,000)

 

21(Design & Contingencies - $126,000)

 

22(46) SR 0147, Stabilize Slope, PA 147
23(North River Road), Upper Paxton and
24Halifax Townships, Project ID 88954

 

25Project Allocation

1,980,000

26(Base Project Allocation - $1,470,000)

 

27(Land Allocation - $60,000)

 

28(Design & Contingencies - $450,000)

 

29(47) SR 0147, Highway Portion Bridge
30Replacement, PA 147 (Market Street)

 

1over Shippen Run, Millersburg Borough,
2Project ID 90772

 

3Project Allocation

1,080,000

4(Base Project Allocation - $1,080,000)

 

5(48) SR 0230, Resurface, PA 230
6(Harrisburg Pike) from PA 341
7(Colebrook Road) to Tioga Avenue,
8Londonderry and Lower Swatara
9Townships and Middletown Borough,
10Project ID 97278

 

11Project Allocation

2,250,000

12(Base Project Allocation - $2,250,000)

 

13(49) SR 0022, Highway Portion Bridge
14Preservation, William B. Lentz Highway
15(US 22) over I-81 and Ramps, City of
16Harrisburg and Susquehanna Township,
17Project ID 80696

 

18Project Allocation

3,154,000

19(Base Project Allocation - $2,861,000)

 

20(Design & Contingencies - $293,000)

 

21(50) SR 0225, Highway Portion Bridge
22Replacement, PA 225 over Tributary of
23Deep Creek, Mifflin Township, Project
24ID 90773

 

25Project Allocation

1,220,000

26(Base Project Allocation - $1,220,000)

 

27(51) SR 0147, Resurface, PA 147 (Peters
28Mountain Road) from Northumberland
29County Line to South of SR 4002
30(Shippen Dam Road), Halifax Borough,

 

1Halifax Township, Millersburg Borough
2and Upper Paxton Township, Project ID
3100190

 

4Project Allocation

2,500,000

5(Base Project Allocation - $2,500,000)

 

6(52) SR 3005, Highway Portion Bridge
7Preservation, SR 3005 (40th Street)
8over Norfolk Southern, Swatara
9Township, Project ID 99957

 

10Project Allocation

500,000

11(Base Project Allocation - $500,000)

 

12(53) SR 3032, Resurface, Southbound SR
133032 (Airport Connector Road) from PA
14230 to PA 283, Lower Swatara Township,
15Project ID 100184

 

16Project Allocation

5,000,000

17(Base Project Allocation - $5,000,000)

 

18(54) SR 0209, Resurface, US 209 (State
19Street) from Washington Township Line
20to PA 147, Millersburg Borough, Upper
21Paxton Township, Project ID 100202

 

22Project Allocation

2,500,000

23(Base Project Allocation - $2,500,000)

 

24(55) SR 2007, Highway Portion Bridge
25Preservation, SR 2007 (Deodate Road)
26over Conewago Creek, Londonderry
27Township, Project ID 99922

 

28Project Allocation

1,158,000

29(Base Project Allocation - $1,158,000)

 

30(56) I-83, Reconstruction, I-83 from

 

1Cumberland County Line to its Northern
2Terminus at I-81, Various
3Municipalities, Project ID 0

 

4Project Allocation

34,400,000

5(Base Project Allocation -
6$34,400,000)

 

7(57) SR 3032, Resurface, Northbound SR
83032 (Airport Connector Road) from PA
9230 to PA 283, Lower Swatara Township,
10Project ID 100110

 

11Project Allocation

5,000,000

12(Base Project Allocation - $5,000,000)

 

13(58) Park Boulevard, Roadway Realignment,
14Park Boulevard between SR 0039 and SR
150422, Derry Township, Project ID 0

 

16Project Allocation

7,500,000

17(Base Project Allocation - $7,500,000)

 

18(59) I-283, Reconstruction, I-283 from
19Its Southern Terminus at Pennsylvania
20Turnpike to its Northern Terminus at
21I-81, Various Municipalities, Project
22ID 0

 

23Project Allocation

11,400,000

24(Base Project Allocation - 11,400,000

 

25(60) I-81, Reconstruction, I-81 from
26Cumberland County Line to Lebanon
27County Line, Various Municipalities,
28Project ID 0

 

29Project Allocation

66,600,000

30(Base Project Allocation -

 

1$66,600,000)

 

2Section 323. Delaware County.

3Projects are as follows:

 

4(1) (Reserved).

 

5(2) SR 0095, Restoration, I-95, Delaware
6State Line to City of Philadelphia,
7Lower Chichester Township, Project ID
892581

 

9Project Allocation

16,940,000

10(Base Project Allocation -
11$16,940,000)

 

12(3) SR 0003, Reconstruct, 0003/0221
13through 0003/0241, Upper Darby
14Township, Project ID 70229

 

15Project Allocation

6,072,000

16(Base Project Allocation - $6,072,000)

 

17(4) SR 0252 and SR 0003, Intersection
18Improvements, Intersection of SR 0252
19and SR 0003, Newtown Township, Project
20ID 96946

 

21Project Allocation

4,000,000

22(Base Project Allocation - $4,000,000)

 

23(5) SR 0202, Completion of Loop Road
24South of US 1 and Modifications to
25Existing Loop Roads North of US 1, SR
260202/SR 0001 Loop Road System, Chadds
27Ford and Concord Townships, Project ID
2895429

 

29Project Allocation

1,071,000

30(Base Project Allocation - $700,000)

 

1(Land Allocation - $91,000)

 

2(Design & Contingencies - $280,000)

 

3(6) SR 2006, Safety Improvement, MacDade
4Boulevard, Ashland Avenue to Cherry
5Street, Glenolden Borough, Project ID
664790

 

7Project Allocation

5,863,000

8(Base Project Allocation - $5,863,000)

 

9(7) SR 0420, Intersection Improvement,
10Kedron Avenue and Franklin Avenue,
11Ridley Township, Project ID 64791

 

12Project Allocation

831,000

13(Base Project Allocation - $831,000)

 

14(8) SR 0095 Corridor, Highway
15Rehabilitation Associated with Bridge
16Work, Various Bridges Spanning I-95,
17City of Chester, Ridley Township,
18Upland Borough, Project ID 88407

 

19Project Allocation

385,000

20(Base Project Allocation - $310,000)

 

21(Design & Contingencies - $75,000)

 

22(9) SR 2025, Widen Mort Avenue, 2025/0050
23through 2025/0060, Ridley Township and
24Rutledge Borough, Project ID 57757

 

25Project Allocation

2,393,000

26(Base Project Allocation - $2,393,000)

 

27(10) SR 0003, Resurfacing (Both
28Directions) from Lawrence Road (SR
291020) to Philadelphia County Line,
30Marple, Haverford, Upper Darby and

 

1Millbourne Townships, Project ID
2102385

 

3Project Allocation

3,520,000

4(Base Project Allocation - $3,500,000)

 

5(Design & Contingencies - $20,000)

 

6(11) I-476, Reconstruction, I-476 from
7its Southern Terminus at I-95 to
8Montgomery County Line, Various
9Municipalities, Project ID 0

 

10Project Allocation

56,600,000

11(Base Project Allocation -
12$56,600,000)

 

13(12) I-95, Reconstruction, I-95 from
14Delaware State Line to City of
15Philadelphia Line, Various
16Municipalities, Project ID 0

 

17Project Allocation

45,400,000

18(Base Project Allocation -
19$45,400,0000)

 

20Section 324. Elk County.

21Projects are as follows:

 

22(1) (Reserved).

 

23(2) SR 0120, Highway Reconstruction, SR
240120, Ridgway Township, City of Saint
25Marys, Project ID 72776

 

26Project Allocation

800,000

27(Base Project Allocation - $800,000)

 

28(3) SR 0219, Safety Improvements, SR 0219
29Segments 0260/1987 to 0270/1396,
30Ridgway Township, Project ID 91951

 

1Project Allocation

300,000

2(Base Project Allocation - $100,000)

 

3(Design & Contingencies - $300,000)

 

4(4) SR 0555, Highway Portion Bridge
5Replacement, PA 555 over Trout Run,
6BMS 24-0555-0210-2887, Benezette
7Township, Project ID 91251

 

8Project Allocation

94,000

9(Land Allocation - $94,000)

 

10(5) SR 0120, Safety Improvements, SR
110120, Segments 0060/1221 to 0070/0336,
12Ridgway Township, Project ID 91947

 

13Project Allocation

300,000

14(Base Project Allocation - $200,000)

 

15(Design & Contingencies - $100,000)

 

16(6) SR 0949, Highway Portion Bridge
17Replacement, SR 0949 over Maxwell Run,
18BMS 24-0949-0020-0000, Spring Creek
19Township, Project ID 89347

 

20Project Allocation

262,000

21(Base Project Allocation - $262,000)

 

22(7) SR 1001, Resurface, SR 1001 from
23Washington Street to Glen Hazel,
24Segments 0010/0000 to 0110/0000, City
25of Saint Marys, Project ID 96262

 

26Project Allocation

358,000

27(Base Project Allocation - $358,000)

 

28(8) SR 0949, Highway Reconstruction, Elk
29County SR 0949 Segments 0110 through
300140, McKean County SR 0006 Segments

 

10970 through 1040, Clearfield County
2SR 1005 Segment 0010 through 0030,
3Various Municipalities, Elk, McKean
4and Clearfield Counties, Project ID
591085

 

6Project Allocation

1,185,000

7(Base Project Allocation - $1,185,000)

 

8(9) SR 4005, Safety Improvements, SR 0066
9Segments 0170 Offset 0107 to
100190/1202, Highland Township, Project
11ID 88234

 

12Project Allocation

400,000

13(Base Project Allocation - $100,000)

 

14(Land Allocation - $100,000)

 

15(Design & Contingencies - $200,000)

 

16(10) SR 0219, Highway Portion Bridge
17Replacement, SR 0219 over Powers Run
18BMS 24-0219-0490-0000, Johnsonburg
19Borough, Ridgway Township, Project ID
2088185

 

21Project Allocation

1,423,000

22(Base Project Allocation - $1,003,000)

 

23(Land Allocation - $79,000)

 

24(Design & Contingencies - $341,000)

 

25(11) Various, Highway Restoration,
26Various Segments of Elk County SR
270949, SR 1003, SR 1005, SR 1007,
28McKean County SR 0155, Various
29Municipalities in Elk and McKean
30Counties, Project ID 90257

 

1Project Allocation

1,750,000

2(Base Project Allocation - $1,750,000)

 

3(12) SR 0120, Resurface, SR 0120, Saint
4Marys to Elk County Line, Segments
50240/0000 to 0420/3134, City of Saint
6Marys, Project ID 93368

 

7Project Allocation

1,293,000

8(Base Project Allocation - $1,201,000)

 

9(Land Allocation - $21,000)

 

10(Design & Contingencies - $71,000)

 

11(13) SR 0006, Highway Restoration, SR
120255 to Kersey, Fox Township, Project
13ID 88275

 

14Project Allocation

450,000

15(Base Project Allocation - $450,000)

 

16(14) SR 0075, Safety Improvements, SR
171001 Segment 0140 Offfset 0532 to
180180/2341, City of Saint Marys,
19Project ID 88241

 

20Project Allocation

400,000

21(Base Project Allocation - $100,000)

 

22(Land Allocation - $100,000)

 

23(Design & Contingencies - $200,000)

 

24(15) SR 0066, Safety and Intersection
25Improvements, PA 948 Nansen
26Intersection, Highland Township,
27Project ID 93349

 

28Project Allocation

4,543,000

29(Base Project Allocation - $4,043,000)

 

30(Land Allocation - $100,000)

 

1(Design & Contingencies - $400,000)

 

2(16) Various, Guiderail Improvements,
3Various Segments of Elk County SR
40153, SR 0219, SR 0948, McKean County
5SR 0219, Various Municipalities in Elk
6and McKean counties, Project ID 89250

 

7Project Allocation

300,000

8(Base Project Allocation - $300,000)

 

9(17) SR 1001, Resurface, SR 1001, Glen
10Hazel Road South, Segment 0110/0000 to
110150/0000, City of Saint Marys,
12Project ID 96263

 

13Project Allocation

139,000

14(Base Project Allocation - $139,000)

 

15(18) SR 0066, Intersection Improvements,
16SR 0066 and SR 0948 Intersection
17Segments 0090 to 0110 and 0520,
18Highland Township, Project ID 93587

 

19Project Allocation

362,000

20(Base Project Allocation - $251,000)

 

21(Land Allocation - $11,000)

 

22(Design & Contingencies - $100,000)

 

23(19) SR 0006, Highway Restoration, Saint
24Mary's to County Line, SR 0120, City
25of Saint Marys, Project ID 88271

 

26Project Allocation

1,000,000

27(Base Project Allocation - $1,000,000)

 

28(20) SR 0120, Highway Reconstruction, SR
290120 Segments 0042 to 0210/2271,
30Ridgway Township, Ridgway Borough,

 

1City of Saint Marys, Project ID 92723

 

2Project Allocation

800,000

3(Base Project Allocation - $800,000)

 

4(21) SR 0120, Safety Improvements, SR
50255 Segment 0020 Offset 1616 to
60040/1311, Jay Township, Project ID
788237

 

8Project Allocation

400,000

9(Base Project Allocation - $100,000)

 

10(Land Allocation - $100,000)

 

11(Design & Contingencies - $200,000)

 

12(22) SR 0255, Highway Resurfacing, SR
130255, Micale Road (Moonwink Curve
14Area) to PA 948 Segments 0140/0000 to
150224/0000, Fox and Jay Townships,
16Project ID 93352

 

17Project Allocation

940,000

18(Base Project Allocation - $600,000)

 

19(Land Allocation - $200,000)

 

20(Design & Contingencies - $140,000)

 

21(23) SR 1001, Resurface, SR 1001, Glen
22Hazel Area Segment 0150/0000 to
230230/0000, Jones Township and City of
24Saint Marys, Project ID 96255

 

25Project Allocation

301,000

26(Base Project Allocation - $260,000)

 

27(Design & Contingencies - $41,000)

 

28(24) SR 0155, Highway Restoration, SR
290219 Segments 0490/0000 to 0540/0659,
30Ridgway Township and Johnsonburg

 

1Borough, Project ID 88273

 

2Project Allocation

300,000

3(Base Project Allocation - $300,000)

 

4(25) SR 1003, Resurface, SR 1003, West
5Creek Road to Windfall Road, Segments
60060/0000 to 0070/3022, City of Saint
7Marys, Project ID 96264

 

8Project Allocation

108,000

9(Base Project Allocation - $108,000)

 

10(26) SR 0120, Highway Reconstruction, SR
110120 from Mohan Run Bridge to City of
12Saint Marys, Ridgway Township and City
13of Saint Marys, Project ID 91971

 

14Project Allocation

600,000

15(Base Project Allocation - $400,000)

 

16(Design & Contingencies - $200,000)

 

17(27) SR 0872, Highway Restoration, McKean
18County Line to Forest County Line,
19Highland Township, Project ID 88276

 

20Project Allocation

1,000,000

21(Base Project Allocation - $1,000,000)

 

22(28) SR 0044, Highway Restoration, SR
230219 to Greentree Road, Horton and Fox
24Townships, Project ID 88274

 

25Project Allocation

300,000

26(Base Project Allocation - $300,000)

 

27(29) SR 0949, Resurface, SR 0949, West of
28Island Run to PA 948 Segments
290250/0000 to 0350/0427, Ridgway
30Borough and Ridgway Township, Project

 

1ID 101123

 

2Project Allocation

1,600,000

3(Base Project Allocation - $1,600,000)

 

4(30) SR 0948, Resurface, SR 0948,
5Montmorenci Avenue Segments 0202/0000
6to 0220/0000, Ridgway Borough, Project
7ID 101114

 

8Project Allocation

877,000

9(Base Project Allocation - $877,000)

 

10(31) SR 1001, Betterment (Restoration),
11SR 1000 Quad Routes, Jones Township,
12Project ID 101946

 

13Project Allocation

5,235,000

14(Base Project Allocation - $5,085,000)

 

15(Design & Contingencies - $150,000)

 

16(32) SR 3001, Betterment (Restoration),
17SR 3000 Quad Routes, Horton and
18Millstone Townships, Ridgway Borough,
19Ridgway and Spring Creek Townships,
20Project ID 101948

 

21Project Allocation

11,945,000

22(Base Project Allocation -
23$11,795,000)

 

24(Design & Contingencies - $150,000)

 

25(33) SR 2003, Resurface, SR 2003,
26Landfill to Dagus Mines Segments
270040/0000 to 0150/3354, Fox Township,
28Project ID 101139

 

29Project Allocation

2,100,000

30(Base Project Allocation - $2,100,000)

 

1(34) SR 2004, Resurface, SR 2004, Medix
2Run to Cameron County Line Segments
30010/0000 to 0130/0870, Benezette
4Township, Project ID 101142

 

5Project Allocation

1,852,000

6(Base Project Allocation - $1,852,000)

 

7(35) SR 0949, Resurface, SR 0949, Mahood
8Run, Toward Island Run Segments
90110/0000 to 0250/0000, Ridgway and
10Spring Creek Townships, Project ID
11101115

 

12Project Allocation

2,382,000

13(Base Project Allocation - $2,382,000)

 

14(36) SR 4001, Betterment (Restoration),
15SR 4000 Quad Routes, Highland
16Township, Johnsonburg Borough, Jones
17and Ridgway Townships, Project ID
18101949

 

19Project Allocation

9,561,000

20(Base Project Allocation - $9,410,000)

 

21(Design & Contingencies - $151,000)

 

22(37) SR 2001, Betterment (Restoration),
23SR 2000 Quad Routes, Fox and Horton
24Townships, City of Saint Marys,
25Project ID 101947

 

26Project Allocation

12,032,000

27(Base Project Allocation -
28$11,881,000)

 

29(Design & Contingencies - $151,000)

 

30(38) SR 1007, Resurface, SR 1007, Hall

 

1Avenue Segments 0010/0000 to
20030/0240, City of Saint Marys,
3Project ID 101133

 

4Project Allocation

100,000

5(Base Project Allocation - $100,000)

 

6(39) SR 0555, Resurface, SR 0555, West of
7Benezette to Cameron County, Segments
80190/0000 to 0380/2499, Benezette
9Township, Project ID 101110

 

10Project Allocation

3,253,000

11(Base Project Allocation - $3,253,000)

 

12(40) SR 0321, Betterment (Restoration),
13PA 321, Jones Township, Project ID
14101885

 

15Project Allocation

2,636,000

16(Base Project Allocation - $2,485,000)

 

17(Design & Contingencies - $151,000)

 

18(41) SR 0948, Betterment (Restoration),
19PA 948, Fox, Highland, Jones and
20Ridgway Townships, Project ID 101887

 

21Project Allocation

9,787,000

22(Base Project Allocation - $9,636,000)

 

23(Design & Contingencies - $151,000)

 

24(42) SR 0555, Resurface, SR 0555,
25Weedville toward Benezette Segments
260010/0000 to 0190/0000, Benezette and
27Jay Townships, Project ID 101107

 

28Project Allocation

3,158,000

29(Base Project Allocation - $3,158,000)

 

30(43) SR 0949, Betterment (Restoration),

 

1PA 0949, Spring Creek Township,
2Project ID 101888

 

3Project Allocation

2,537,000

4(Base Project Allocation - $2,386,000)

 

5(Design & Contingencies - $151,000)

 

6(44) SR 0219, Betterment (Restoration),
7US 219, Horton Township, Johnsonburg
8Borough, Jones Township, Ridgway
9Borough, Ridgway Township, Project ID
10101889

 

11Project Allocation

12,876,000

12(Base Project Allocation -
13$12,726,000)

 

14(Design & Contingencies - $150,000)

 

15(45) SR 0255, Resurface, SR 0255, Saint
16Marys to Johnsonburg, Segments
170340/0000 to 0500/1979, Johnsonburg
18Borough, Ridgway Township and City of
19Saint Marys, Project ID 101101

 

20Project Allocation

3,067,000

21(Base Project Allocation - $3,067,000)

 

22(46) SR 0153, Betterment (Restoration),
23PA 153, Fox and Horton Townships,
24Project ID 101950

 

25Project Allocation

1,971,000

26(Base Project Allocation - $1,821,000)

 

27(Design & Contingencies - $150,000)

 

28(47) SR 0255, Resurface, SR 0255,
29Clearfield County Line to Rita Lane
30Segments 0010/0000 to 0150/0820, Jay

 

1Township, Project ID 101147

 

2Project Allocation

4,500,000

3(Base Project Allocation - $4,500,000)

 

4(48) SR 0219, Resurface, SR 0219, Wilcox
5to McKean County Segments 0660/0000 to
60740/2475, Jones Township, Project ID
7101097

 

8Project Allocation

1,191,000

9(Base Project Allocation - $1,191,000)

 

10Section 325. Erie County.

11Projects are as follows:

 

12(1) (Reserved).

 

13(2) SR 0005, Restoration and Resurface,
14SR 0005 (East Lake Road) from Dewey
15Road to the New York State Line, North
16East Township, Project ID 97884

 

17Project Allocation

3,511,000

18(Base Project Allocation - $3,461,000)

 

19(Design and Contingencies - $50,000)

 

20(3) SR 3006, Reconstruction, SR 3006
21(Crossingville Road/Plum Street) from
22Fry Road to Bridge over Conneaut Inlet
23at Angling Road, Edinboro Borough and
24Washington Township, Project ID 97883

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(4) SR 4016, Roadway Reconstruction and
28New Bridge, SR 4016 (Millfair Road)
29from SR 0020 (Ridge Road) to SR 0005
30(West Lake Road), Fairview and

 

1Millcreek Townships, Project ID 88716

 

2Project Allocation

2,926,000

3(Base Project Allocation - $2,926,000)

 

4(5) SR 0020, Restoration, SR 0020
5(Buffalo Road) from Mooreheadville
6Road to Cemetery Road, Harborcreek and
7North East Townships, Project ID 92826

 

8Project Allocation

638,000

9(Base Project Allocation - $587,000)

 

10(Design & Contingencies - $51,000)

 

11(6) SR 0098, Restoration and Resurface,
12SR 0098 from Hawthorne Avenue to SR
130832, Fairview Township, Project ID
1489211

 

15Project Allocation

3,000,000

16(Base Project Allocation - $3,000,000)

 

17(7) SR 0531, Restoration and Resurface,
18SR 0531 (Depot Road) at I-90 (American
19Veterans Memorial Highway)
20Interchange, Harborcreek Township,
21Project ID 97887

 

22Project Allocation

963,000

23(Base Project Allocation - $963,000)

 

24(8) SR 0019, Reconstruction, SR 0019
25(Peach Street) from Townhall Road to
26Oliver Road, Summit Township, Project
27ID 97888

 

28Project Allocation

7,500,000

29(Base Project Allocation - $7,500,000)

 

30(9) SR 3006, Reconstruction, SR 3006

 

1(Crossingville Road) from Intersection
2with Washington Town Boulevard to 500
3Feet East of Intersection with Fry
4Road, Washington Township, Project ID
588711

 

6Project Allocation

354,000

7(Base Project Allocation - $224,000)

 

8(Land Allocation - $70,000)

 

9(Design & Contingencies - $60,000)

 

10(10) SR 0005, Restoration, SR 0005 (12th
11Street) from Pittsburgh Avenue to
12Greengarden Boulevard, City of Erie,
13Millcreek Township, Project ID 96310

 

14Project Allocation

636,000

15(Land Allocation - $71,000)

 

16(Design & Contingencies - $565,000)

 

17(11) SR 0090, Highway Reconstruction, I-
1890 (American Veterans Memorial
19Highway) from Ohio to SR 0832,
20Conneaut, Fairview, Girard and McKean
21Townships, Platea Borough, Springfield
22township, Project ID 92591

 

23Project Allocation

31,661,000

24(Base Project Allocation -
25$30,501,000)

 

26(Land Allocation - $580,000)

 

27(Design & Contingencies - $580,000)

 

28(12) SR 0005, Restoration and Resurface,
29SR 0005 (12th Street) from Chestnut
30Street to Bayfront Parkway, City of

 

1Erie, Project ID 98021

 

2Project Allocation

1,400,000

3(Base Project Allocation - $1,400,000)

 

4(13) Various, Restoration and Resurface,
5SR 0005 (Lake Road), SR 0006 (Grand
6Army of the Republic Highway), SR 0018
7and SR 0020 (Lake Road), Albion
8Borough, Conneaut Township, City of
9Corry, North East, Springfield and
10Wayne Townships, Project ID 97867

 

11Project Allocation

4,350,000

12(Base Project Allocation - $4,350,000)

 

13(14) Various, Restoration – ADA Curb
14Cuts, Various Routes in City of Erie,
15Project ID 94722

 

16Project Allocation

43,000

17(Base Project Allocation - $43,000)

 

18(15) SR 1017, Installation of Constant
19Warning Time Devices, SR 1017 Gulf
20Road Railroad Crossing – AAR #471859a,
21North East Township, Project ID 66881

 

22Project Allocation

50,000

23(Base Project Allocation - $50,000)

 

24(16) SR 0086, Correct Embankment Erosion
25with Rock, I-86 (Hopkins-Bowser
26Highway), Greenfield Township, Project
27ID 97039

 

28Project Allocation

100,000

29(Base Project Allocation - $100,000)

 

30(17) SR 4012, Reconstruction – Widen Road

 

1and Bridge, Bridge Rehabilitation and
2Add Left Turn Lanes to I-79 Ramps, SR
34012 Old Zuck Road to Zimmerly Road
4and SR 0699 from Zimmerly Road to
5Peach Street, Millcreek Township,
6Project ID 95558

 

7Project Allocation

26,145,000

8(Base Project Allocation -
9$21,674,000)

 

10(Land Allocation - $1,897,000)

 

11(Design & Contingencies - $2,574,000)

 

12(18) SR 0008, Restoration/Resurface, SR
130008 from Main Street to Waterford
14Road, SR 0019 (Waterford Pike) from US
156n to SR 0097 and SR 0197 (Waterford
16Street) from SR 0008 to SR 0019, Amity
17and Le Boeuf Townships, Union City
18Borough, Union and Waterford
19Townships, Project ID 96882

 

20Project Allocation

3,349,000

21(Base Project Allocation - $3,349,000)

 

22(19) SR 4017, Installation of Constant
23Warning Time Devices, SR 4017
24Pittsburgh Road Railroad Crossing –
25AAR #471915e, City of Erie, Project ID
2666880

 

27Project Allocation

116,000

28(Base Project Allocation - $116,000)

 

29(20) SR 0019, Safety Improvement, SR 0019
30(Waterford Pike) from PennDOT

 

1Maintenance Shed, Summit Township,
2Project ID 83185

 

3Project Allocation

352,000

4(Land Allocation - $42,000)

 

5(Design & Contingencies - $310,000)

 

6(21) SR 1013, Installation of Constant
7Warning Time Devices, SR 1013 Williams
8Road Railroad Crossing – AAR #471874c,
9North East Township, Project ID 66882

 

10Project Allocation

50,000

11(Base Project Allocation - $50,000)

 

12(22) Installation of Constant Warning
13Time Devices, Spencer Road Railroad
14Crossing – AAR #471875j, North East
15Borough, Project ID 66901

 

16Project Allocation

50,000

17(Base Project Allocation - $50,000)

 

18(23) SR 0005, Restoration and Resurface,
19SR 0005 (12th Street) from Greengarden
20Road to Chestnut Street, City of Erie,
21Project ID 98020

 

22Project Allocation

2,300,000

23(Base Project Allocation - $2,300,000)

 

24(24) SR 4017, Restoration, Mill and
25Overlay, SR 4017 (Pittsburgh Avenue)
26from 38th Street to 8th Street, City
27of Erie, Project ID 92827

 

28Project Allocation

301,000

29(Base Project Allocation - $220,000)

 

30(Design & Contingencies - $81,000)

 

1(25) SR 0005, Resurface and Restoration,
2SR 0005 (West 12th Street) from
3Pittsburgh Avenue to Weschler Avenue,
4City of Erie and Millcreek Township,
5Project ID 90286

 

6Project Allocation

2,500,000

7(Base Project Allocation - $2,500,000)

 

8(26) SR 0290, Restoration, SR 0290
9(Bayfront Connector), City of Erie and
10Harborcreek Township, Project ID 89219

 

11Project Allocation

2,782,000

12(Base Project Allocation - $2,701,000)

 

13(Design & Contingencies - $81,000)

 

14(27) SR 1006, Installation of Constant
15Warning Time Devices, SR 1006
16Moorheadville Road Railroad Crossing –
17AAR #471876r, Harborcreek and North
18East Townships, Project ID 66902

 

19Project Allocation

50,000

20(Base Project Allocation - $50,000)

 

21(28) SR 0090, Reconstruction, I-90
22(American Veterans Memorial Highway)
23from the Ohio/Pennsylvania Line to
24past Exit 3 before Sanford Road,
25Springfield Township, Project ID
26102031

 

27Project Allocation

3,321,000

28(Base Project Allocation - $3,000,000)

 

29(Land Allocation - $21,000)

 

30(Design & Contingencies - $300,000)

 

1(29) SR 0020, Resurface and Restoration,
2SR 0020 (Buffalo Road) from Broad
3Street to Cumberland Avenue, City of
4Erie, Harborcreek Township,
5Wesleyville Borough, Project ID 100295

 

6Project Allocation

1,700,000

7(Base Project Allocation - $1,700,000)

 

8(30) SR 0019, Resurface, SR 0019 (Peach
9Street) from Millcreek Mall to Metz
10Street, City of Erie, Millcreek
11Township, Project ID 99804

 

12Project Allocation

3,000,000

13(Base Project Allocation - $3,000,000)

 

14(31) SR 4010, Resurface, SR 4010 (Hershey
15Road) from SR 4011 (Grubb Road) to SR
160019 (Waterford Road), SR 4011 (Grubb
17Road) and SR 4022 (Town Hall Road)
18from SR 0019 to SR 0097, McKean,
19Millcreek and Summit Townships,
20Project ID 100191

 

21Project Allocation

2,550,000

22(Base Project Allocation - $2,550,000)

 

23(32) SR 0955, Resurface, SR 0955
24(Iroquois Avenue) from Nagel Road to
25Buffalo Road, Harborcreek Township,
26Project ID 99700

 

27Project Allocation

900,000

28(Base Project Allocation - $900,000)

 

29(33) SR 0005, Resurface, SR 0005 (West
30Lake Road/12th Street) from Melhorn

 

1Road to Pittsburgh Avenue, City of
2Erie and Fairview and Millcreek
3Townships, Project ID 99808

 

4Project Allocation

6,000,000

5(Base Project Allocation - $6,000,000)

 

6(34) SR 0005, Resurface, SR 0005 (West
7Lake Road) from Maple Avenue to Avonia
8Road, Fairview and Girard Townships
9and Lake City Borough, Project ID
1099730

 

11Project Allocation

1,300,000

12(Base Project Allocation - $1,300,000)

 

13(35) SR 0020, Resurface, SR 0020 (Ridge
14Road) from Millfair Road to Asbury
15Road, Millcreek Township, Project ID
1699729

 

17Project Allocation

750,000

18(Base Project Allocation - $750,000)

 

19(36) SR 0020, Resurface, SR 0020 (Lake
20Road) from the Ohio Line to Rudd Road,
21Springfield Township, Project ID 99726

 

22Project Allocation

600,000

23(Base Project Allocation - $600,000)

 

24(37) SR 0699, Resurface, SR 0699 (Main
25Street/Edinboro Road) from the McKean
26Township Line to Interchange Road,
27McKean Borough and McKean, Millcreek
28and Summit Townships, Project ID 99718

 

29Project Allocation

1,700,000

30(Base Project Allocation - $1,700,000)

 

1(38) SR 0832, Resurface, SR 0832
2(Sterrettania Road) from Grubb Road to
326th Street in Millcreek Township,
4Millcreek Township, Project ID 99716

 

5Project Allocation

600,000

6(Base Project Allocation - $600,000)

 

7(39) SR 0832, Resurface, SR 0832
8(Sterrettania Road) from I-90
9(American Veterans Memorial Highway)
10to Grubb Road, McKean and Millcreek
11Townships, Project ID 99713

 

12Project Allocation

1,200,000

13(Base Project Allocation - $1,200,000)

 

14(40) SR 0020, Resurface, SR 0020 from
15(Buffalo Road) Bartlett Road to
16Morreheadville Road, Harborcreek
17Township, Project ID 99711

 

18Project Allocation

1,200,000

19(Base Project Allocation - $1,200,000)

 

20(41) SR 0020, Resurface, SR 0020 (Ridge
21Road/Main Street) from Imperial Point
22to SR 0098, Fairview and Girard
23Townships, Project ID 99707

 

24Project Allocation

1,600,000

25(Base Project Allocation - $1,600,000)

 

26(42) SR 0197, Resurface, SR 0197
27(Waterford Street) from SR 0008 to SR
280019, Le Boeuf Township, Union City
29Borough, Union and Waterford
30Townships, Project ID 99706

 

1Project Allocation

1,400,000

2(Base Project Allocation - $1,400,000)

 

3(43) SR 0019, Resurface, SR 0019
4(Waterford Pike) from SR 0006n to SR
50097, Le Boeuf and Waterford
6Townships, Project ID 99704

 

7Project Allocation

1,000,000

8(Base Project Allocation - $1,000,000)

 

9(44) SR 0098, Resurface, SR 0098 from
10Sterrettania Road to Lake Road,
11Fairview Township, Project ID 99733

 

12Project Allocation

1,300,000

13(Base Project Allocation - $1,300,000)

 

14(45) SR 0018, Resurface, SR 0018 from the
15Crawford County line to SR 0006n with
16Railroad Coordination with Bessemer
17and Lake Erie Railroad Company (DOT
18#051905p), Albion Borough, Conneaut
19Township, Project ID 99701

 

20Project Allocation

750,000

21(Base Project Allocation - $750,000)

 

22(46) SR 0077, Resurface, SR 0077
23(Spartansburg Highway/Union Street)
24from the Crawford County Line to
25Church Street, Concord Township and
26City of Corry, Project ID 99735

 

27Project Allocation

1,300,000

28(Base Project Allocation - $1,300,000)

 

29(47) SR 0020, Resurface, SR 0020 (Lake
30Road/Ridge Road) from Rudd Road to

 

1Steenburg Road, Springfield Township,
2Project ID 99698

 

3Project Allocation

700,000

4(Base Project Allocation - $700,000)

 

5(48) SR 0006, Resurface, SR 0006 (Grand
6Army of the Republic Highway/Columbus
7Avenue) from Washington Street to the
8Warren County Line, City of Corry and
9Wayne Township, Project ID 99696

 

10Project Allocation

1,100,000

11(Base Project Allocation - $1,100,000)

 

12(49) SR 0699, Resurface, SR 0699 (Erie
13Street) from Old State Road to McKean
14Township Line, McKean and Washington
15Townships, Project ID 99694

 

16Project Allocation

1,100,000

17(Base Project Allocation - $1,100,000)

 

18(50) SR 0019, Reconstruction, Widening,
19SR 0019 (Peach Street) from Metz
20Street to 26th Street, City of Erie,
21Project ID 98333

 

22Project Allocation

1,500,000

23(Base Project Allocation - $1,500,000)

 

24(51) SR 0020, Intersection Improvements
25and Reconstruction Associated with the
26Erie Rail Terminal, SR 0020, SR 4027,
27SR 0955, SR 0430, SR 0290 and SR 0531,
28City of Erie, Harborcreek and Lawrence
29Park Townships, Wesleyville Borough,
30Project ID 99507

 

1Project Allocation

13,501,000

2(Base Project Allocation -
3$10,501,000)

 

4(Land Allocation - $1,500,000)

 

5(Design & Contingencies - $1,500,000)

 

6(52) SR 0008, Resurface and Restoration,
7SR 0008 (Waterford Road) from Baldwin
8Road to One Mile North of Casier Road,
9Amity Township, Project ID 99049

 

10Project Allocation

2,500,000

11(Base Project Allocation - $2,500,000)

 

12(53) SR 0090, Resurface and Restoration,
13I-90 (American Veterans Memorial
14Highway) from Milepost 25 to Milepost
1535, Greene, Harborcreek, Millcreek and
16Summit Townships, Project ID 99054

 

17Project Allocation

20,000,000

18(Base Project Allocation -
19$20,000,000)

 

20(54) SR 0290, Safety Improvements, SR
210290 (Bayfront Connector) from I-79 to
22I-90, City of Erie and Harborcreek
23Township, Project ID 99056

 

24Project Allocation

1,000,000

25(Base Project Allocation - $1,000,000)

 

26(55) SR 0005, Safety Improvements, SR
270005 (West Lake Road/12th Street) from
28Gorman Drive to Brewster Street, City
29of Erie and Millcreek Township,
30Project ID 99057

 

1Project Allocation

500,000

2(Base Project Allocation - $500,000)

 

3(56) SR 0020, Safety Improvements, SR
40020 (Ridge Road/26th Street) from
5Millfair Road to Brown Avenue, City of
6Erie and Millcreek Township, Project
7ID 99059

 

8Project Allocation

500,000

9(Base Project Allocation - $500,000)

 

10(57) SR 0079, Resurface and Restoration,
11I-79 (Raymond P. Shafer Highway) from
12Milepost 165 to Milepost 178,
13Franklin, McKean, Summit and
14Washington Townships, Project ID 99060

 

15Project Allocation

23,000,000

16(Base Project Allocation -
17$23,000,000)

 

18(58) SR 0079, Resurface and Restoration,
19I-79 (Raymond P. Shafer Highway) from
20Milepost 178 to Milepost 182.2, City
21of Erie and Millcreek and Summit
22Townships, Project ID 99062

 

23Project Allocation

6,550,000

24(Base Project Allocation - $6,550,000)

 

25(59) SR 0005, Resurface, SR 0005 (Lake
26Road) from Four Lane West of Mill
27Street to Dewey Road, North East
28Township, Project ID 99703

 

29Project Allocation

1,200,000

30(Base Project Allocation - $1,200,000)

 

1(60) SR 0005, Resurface, SR 0005 (12th
2Street/Lake Road) from Wayne Avenue to
3Mill Street with Railroad Coordination
4with CSX Transportation (DOT
5#524324b), City of Erie and
6Harborcreek, Lawrence Park and North
7East Townships, Project ID 99765

 

8Project Allocation

9,000,000

9(Base Project Allocation - $9,000,000)

 

10(61) SR 3020, Resurface and Restoration,
11SR 3020 (West Road) from SR 0832 to SR
120699, McKean Borough and McKean
13Township, Project ID 98999

 

14Project Allocation

1,250,000

15(Base Project Allocation - $1,250,000)

 

16(62) SR 0290, Resurface and Restoration,
17SR 0290 (Bayfront Connector) from SR
180005 to Knowledge Parkway, City of
19Erie, Harborcreek Township, Project ID
2099000

 

21Project Allocation

3,500,000

22(Base Project Allocation - $3,500,000)

 

23(63) SR 0197, Resurface and Restoration,
24SR 0197 (Waterford Street) from
25Waterford to Robinson Road, Summit and
26Waterford Townships and Waterford
27Borough, Project ID 99007

 

28Project Allocation

1,500,000

29(Base Project Allocation - $1,500,000)

 

30(64) SR 0019, Safety Improvements –

 

1Congestion Reduction and Improvements,
2SR 0019 (Peach Street) from Dorn Road
3to Robinson Road, Summit Township,
4Project ID 98308

 

5Project Allocation

2,536,000

6(Base Project Allocation - $2,536,000)

 

7(65) SR 0019, Resurface and Restoration,
8SR 0019 (Peach Street) from Waterford
9to Robinson Road, Summit Township,
10Waterford Borough, Waterford Township,
11Project ID 99010

 

12Project Allocation

2,000,000

13(Base Project Allocation - $2,000,000)

 

14(66) SR 0020, Resurface and Restoration,
15SR 0020 (Buffalo Road) from Water
16Street to Walbridge Road, Harborcreek
17Township and Wesleyville Borough,
18Project ID 99015


19Project Allocation

2,000,000

20(Base Project Allocation - $2,000,000)

 

21(67) SR 4016, Resurface and Restoration,
22SR 4016 (38th Street) from State
23Street to McClelland Avenue, City of
24Erie, Project ID 99020

 

25Project Allocation

4,000,000

26(Base Project Allocation - $4,000,000)

 

27(68) SR 0077, Resurface and Restoration,
28SR 0077 (Church Street/Main Street)
29from Church Street to SR 0426 (Center
30Street), City of Corry, Project ID

 

199023

 

2Project Allocation

1,000,000

3(Base Project Allocation - $1,000,000)

 

4(69) SR 3006, Intersection Improvement,
5Intersection of SR 3006 (US 6n/Plum
6Street) and SR 3023 (Angling Road),
7Edinboro Borough and Washington
8Township, Project ID 98338

 

9Project Allocation

1,250,000

10(Base Project Allocation - $1,250,000)

 

11(70) SR 0020, Resurface, SR 0020 (Main
12Street/Ridge Road) from Water Street
13to Millfair Road, Fairview Township,
14Project ID 99768

 

15Project Allocation

3,500,000

16(Base Project Allocation - $3,500,000)

 

17(71) SR 0005, Resurface, SR 0005 (West
18Lake Road) from SR 0020 to Maple
19Avenue, Girard and Springfield
20Townships and Lake City Borough,
21Project ID 99806

 

22Project Allocation

4,000,000

23(Base Project Allocation - $4,000,000)

 

24(72) SR 0955, Resurface, SR 0955 (Michael
25D. Crotty Memorial) from Lake Road to
26Nagle Road, Lawrence Park Township,
27Project ID 99732

 

28Project Allocation

550,000

29(Base Project Allocation - $550,000)

 

30(73) SR 4010, Reconstruction,

 

1Intersection Improvement and Paving,
2SR 4010 (Hershey Road) from Hershey
3Road to SR 0099, McKean, Millcreek and
4Summit Townships, Project ID 98322

 

5Project Allocation

2,500,000

6(Base Project Allocation - $2,500,000)

 

7(74) SR 0197, Reconstruction, SR 0197
8(Waterford Street) from Townhall Road
9to Bloomfield Parkway, Summit
10Township, Project ID 101502

 

11Project Allocation

20,000,000

12(Base Project Allocation -
13$19,550,000)

 

14(Land Allocation - $150,000)

 

15(Design & Contingencies - $300,000)

 

16(75) SR 0005, Resurface, SR 0008 (12th
17Street) from Lincoln Avenue to Peach
18Street, City of Erie, Project ID 99763

 

19Project Allocation

5,000,000

20(Base Project Allocation - $5,000,000)

 

21(76) SR 0019, Resurface, SR 0019
22(Waterford Pike) from SR 0197 to SR
230197, Waterford Borough and Waterford
24Township, Project ID 99762

 

25Project Allocation

550,000

26(Base Project Allocation - $550,000)

 

27(77) SR 0020, Resurface, SR 0020 (Buffalo
28Road) from Broad Street to Cumberland
29Road, City of Erie, Harborcreek
30Township and Wesleyville Borough,

 

1Project ID 99759

 

2Project Allocation

700,000

3(Base Project Allocation - $700,000)

 

4(78) SR 4027, Resurface, SR 4027 (Water
5Street) from Buffalo Road to Lake
6Road, Lawrence Park Township and
7Wesleyville Borough, Project ID 99758

 

8Project Allocation

350,000

9(Base Project Allocation - $350,000)

 

10(79) SR 0008, Resurface, SR 0008 (Main
11Street/Smiley Hill Road) from the
12Union City Borough Line to Baldwin
13Street, Amity Township, Union City
14Borough, Union Township, Project ID
1599757

 

16Project Allocation

1,150,000

17(Base Project Allocation - $1,150,000)

 

18(80) SR 3006, Resurface, SR 3006 (US 6n)
19from Ridge Road to Cherry Hill Road,
20Conneaut and Springfield Townships,
21Project ID 99753

 

22Project Allocation

2,400,000

23(Base Project Allocation - $2,400,000)

 

24(81) SR 0832, Resurface, SR 0832
25(Peninsula Drive) from 26th Street to
26Presque Isle State Park, McKean and
27Millcreek Townships, Project ID 99750

 

28Project Allocation

1,100,000

29(Base Project Allocation - $1,100,000)

 

30(82) SR 0006, Resurface, SR 0006 (Grand

 

1Army of the Republic Highway) from
2Mitchell Road to SR 0089, Union and
3Wayne Townships, Project ID 99747

 

4Project Allocation

1,280,000

5(Base Project Allocation - $1,280,000)

 

6(83) SR 0699, Resurface, SR 0699 (Erie
7Street) from SR 0006n to Old State
8Road, Edinboro Borough and Washington
9Township, Project ID 99746

 

10Project Allocation

1,200,000

11(Base Project Allocation - $1,200,000)

 

12(84) SR 0020, Resurface SR 0020 (Main
13Street) from Hirtzell Road to the New
14York State Line, North East Township,
15Project ID 99744

 

16Project Allocation

711,000

17(Base Project Allocation - $711,000)

 

18(85) SR 0197, Resurface, SR 0197
19(Waterford Street) from Marsh Road to
20Race Avenue, Summit Township, Project
21ID 99741

 

22Project Allocation

925,000

23(Base Project Allocation - $925,000)

 

24(86) SR 0008, Resurface, SR 0008
25(Waterford Road/Main Street) from
26French Creek Bridge to Haskell Hill
27Road, Amity and Venango Townships,
28Wattsburg Borough, Project ID 99738

 

29Project Allocation

800,000

30(Base Project Allocation - $800,000)

 

1(87) SR 0020, Resurface, SR 0020 (Buffalo
2Road) from Walbridge Road to Iroquois
3Avenue, Harborcreek Township, Project
4ID 99802

 

5Project Allocation

1,500,000

6(Base Project Allocation - $1,500,000)

 

7(88) SR 4009, Intersection Improvement
8Potential Roundabout, SR 4009 Segment
90030/Offset 2000 to Segment
100040/Offset 0500, Summit Township,
11Project ID 102069

 

12Project Allocation

740,000

13(Base Project Allocation - $620,000)

 

14(Land Allocation - $30,000)

 

15(Design & Contingencies - $90,000)

 

16(89) SR 4034, Study, West 12th Street (SR
170005) to East 12th Street (SR 0005)
18with Two CSX Transportation at Grade
19Railroad Crossings, City of Erie,
20Project ID 102234

 

21Project Allocation

500,000

22(Base Project Allocation - $500,000)

 

23(90) SR 0531, Highway Reconstruction,
24Prindle Road to SR 0020 Buffalo Road,
25Harborcreek Township, Project ID
26102468

 

27Project Allocation

350,000

28(Base Project Allocation - $350,000)

 

29(91) I-79, Reconstruction, I-79 from the
30Crawford County Line to its Northern

 

1Terminus in City of Erie, Various
2Municipalities, Project ID 0

 

3Project Allocation

78,400,000

4(Base Project Allocation -
5$78,400,000)

 

6(92) I-86, Reconstruction, I-86 from its
7Western Terminus at I-90 to the New
8York State Line, Various
9Municipalities, Project ID 0

 

10Project Allocation

28,000,000

11(Base Project Allocation -
12$28,000,000)

 

13(93) I-90, Reconstruction, I-90 from Ohio
14State Line to New York State Line,
15Various Municipalities, Project ID 0

 

16Project Allocation

185,600,000

17(Base Project Allocation -
18$185,600,000)

 

19(94) SR 4010, SR 0699, Highway
20Reconstruction, Intersection of SR
210699 (Edinboro Road) and SR 4010
22(Hershey Road), Summit Township,
23Project ID 102075

 

24Project Allocation

603,000

25(Base Project Allocation - $400,000)

 

26(Land Allocation - $133,000)

 

27(Design & Contingencies - $70,000)

 

28(95) SR 0090, Safety Improvement Cable
29Median Barrier, SR 0090 Segment
300240/Offset 2656, Segment 0260/Offset

 

12027, Summit Township, Project ID
2102176

 

3Project Allocation

60,000

4(Base Project Allocation - $60,000)

 

5(96) SR 0090, Reconstruction, I-90
6(American Veterans Memorial Highway)
7just after Keefer Road to just before
8Milfair Road, Conneaut, Fairview and
9McKean Townships, Project ID 102044

 

10Project Allocation

3,437,000

11(Base Project Allocation - $3,100,000)

 

12(Land Allocation - $21,000)

 

13(Design & Contingencies - $316,000)

 

14(97) SR 0019, SR 4024, Safety Improvement
15and Retiming of Existing Signals,
16Intersection of SR 0019 (Peach Street)
17and SR 4024 (Robison Road) Summit
18Township, Project ID 102076

 

19Project Allocation

50,000

20(Base Project Allocation - $30,000)

 

21(Design & Contingencies - $20,000)

 

22(98) SR 0090, Reconstruction, I-90
23(American Veterans Memorial Highway)
24before Neiger Road to past Exit 9
25before Cross Station Road, Girard
26Township and Platea Borough, Project
27ID 102040

 

28Project Allocation

4,202,000

29(Base Project Allocation - $3,801,000)

 

30(Land Allocation - $20,000)

 

1(Design & Contingencies - $381,000)

 

2(99) SR 0090, Reconstruction, I-90
3(American Veterans Memorial Highway)
4from just before Sanford Road into
5Girard Township in Springfield and
6Girard Townships, Project ID 102039

 

7Project Allocation

3,022,000

8(Base Project Allocation - $2,701,000)

 

9(Land Allocation - $20,000)

 

10(Design & Contingencies - $301,000)

 

11(100) SR 0090, Reconstruction, I-90
12(American Veterans Memorial Highway)
13from before Mill Road to just past
14Doggett Road, Fairview and Girard
15Townships, Project ID 102041

 

16Project Allocation

3,760,000

17(Base Project Allocation - $3,400,000)

 

18(Land Allocation - $20,000)

 

19(Design & Contingencies - $340,000)

 

20(101) SR 4010, Highway Reconstruction, SR
214010 Segment 0050/Offset 0800 to
22Segment 0050/Offset 1900, Summit
23Township, Project ID 102074

 

24Project Allocation

155,000

25(Base Project Allocation - $100,000)

 

26(Land Allocation - $15,000)

 

27(Design & Contingencies - $40,000)

 

28(102) Various State Routes, Safety
29Improvements – Roadway Departure
30Implementation Plan (RDIP), Various

 

1State Routes in Various
2Municipalities, Project ID 102099

 

3Project Allocation

30,000

4(Base Project Allocation - $30,000)

 

5(103) Various State Routes, Safety
6Improvement, Intersection Safety
7Implementation Plan (ISIP), Various
8Municipalities, Project ID 102082

 

9Project Allocation

30,000

10(Base Project Allocation - $30,000)

 

11Section 326. Fayette County.

12Projects are as follows:

 

13(1) SR 0711, Resurface, PA 711, Crawford
14Avenue to Foxburg Road, Cities of
15Uniontown and Connellsville, Masontown
16and Fairchance Boroughs, Georges,
17South Union, Franklin, North Union,
18Menallen, Springhill, Nicholson,
19German, Connellsville and Springfield
20Townships, Project ID 102382

 

21Project Allocation

2,300,000

22(Base Project Allocation - $2,300,000)

 

23(2) SR 0021, Highway Portion Bridge
24Replacement, SR 0166, German Township,
25Project ID 79306

 

26Project Allocation

3,226,000

27(Base Project Allocation - $2,178,000)

 

28(Land Allocation - $294,000)

 

29(Design & Contingencies - $754,000)

 

30(3) SR 0119, Installation of Equipment,

 

1SR 0119 Corridor, Various
2Municipalities, Project ID 93206

 

3Project Allocation

3,500,000

4(Base Project Allocation - $3,000,000)

 

5(Design & Contingencies - $500,000)

 

6(4) SR 0051, Pavement Preservation, PA
751, Oliver Road to Bitner Road, North
8Union Township, Project ID 87370

 

9Project Allocation

684,000

10(Base Project Allocation - $684,000)

 

11(5) SR 4003, Highway Portion Bridge
12Preservation, SR 4003 over Redstone
13Creek, Brownsville and Jefferson
14Townships, Project ID 30010

 

15Project Allocation

5,340,000

16(Base Project Allocation - $3,990,000)

 

17(Land Allocation - $150,000)

 

18(Design & Contingencies - $1,200,000)

 

19(6) SR 4044, Highway Portion Bridge
20Replacement, SR 4044 over Downers Run,
21Washington Township, Project ID 79337

 

22Project Allocation

2,689,000

23(Base Project Allocation - $2,016,000)

 

24(Land Allocation - $123,000)

 

25(Design & Contingencies - $550,000)

 

26(7) SR 2040, Highway Restoration, SR 2040
27over Coal Lick Run, City of Uniontown,
28Project ID 90993

 

29Project Allocation

651,000

30(Land Allocation - $150,000)

 

1(Design & Contingencies - $501,000)

 

2(8) SR 0021, Various Routes, CMAQ- Signal
3Upgrades, SR 0021, South Union and
4Washington Townships and City of
5Uniontown, Project ID 94953

 

6Project Allocation

424,000

7(Base Project Allocation - $294,000)

 

8(Land Allocation - $48,000)

 

9(Design & Contingencies - $82,000)

 

10(9) SR 0906, Slide Repair, Roadway
11Realignment, PA 906, 0030/0500-
120040/2300, Belle Vernon Borough,
13Washington Township, Project ID 95794

 

14Project Allocation

1,021,000

15(Base Project Allocation - $700,000)

 

16(Land Allocation - $121,000)

 

17(Design & Contingencies - $200,000)

 

18(10) SR 0021, Highway Reconstruction, SR
190021 from Thompson Cross Roads to SR
203023, Menallen and South Union
21Townships, Project ID 87820

 

22Project Allocation

1,600,000

23(Base Project Allocation - $1,600,000

 

24(11) SR 0119 from Pechin Road (SR 1028)
25to Wal-Mart, Segments 0550 to 0600,
26Dunbar Township, Project ID 82945

 

27Project Allocation

1,900,000

28(Base Project Allocation - $1,900,000)

 

29(12) SR 0040, Intersection Improvements,
30US 40 at New Salem Road, North Union

 

1and South Union Townships, Project ID
295695

 

3Project Allocation

617,000

4(Base Project Allocation - $465,000)

 

5(Land Allocation - $61,000)

 

6(Design & Contingencies - $91,000)

 

7(13) SR 0119, Intersection Improvements,
8US 119/T-821 (Mclure Road), Upper
9Tyrone Township, Project ID 96661

 

10Project Allocation

3,601,000

11(Base Project Allocation - $3,000,000)

 

12(Design & Contingencies - $601,000)

 

13(14) SR 0051, Highway Reconstruction, PA
1451 Segments 0200 to 0231, Franklin
15Township, Project ID 87372

 

16Project Allocation

3,400,000

17(Base Project Allocation - $3,400,000)

 

18(15) SR 0119, Resurface, US 119,
19Smithfield Masontown Road to Farm
20Road, Cities of Uniontown and
21Connellsville, Masontown and
22Fairchance Boroughs, Georges, South
23Union, Franklin , North Union,
24Menallen, Springhill, Nicholson,
25German, Connellsville and Springfield
26Townships, Project ID 102382

 

27Project Allocation

800,000

28(Base Project Allocation - $800,000)

 

29(16) SR 0711 Resurface, PA 711, Crawford
30Avenue to Foxburg Road, Cities of

 

1Uniontown and Connellsville, Masontown
2and Fairchance Boroughs, Georges,
3South Union, Franklin, North Union,
4Menallen, Springhill, Nicholson,
5German, Connellsville and Springfield
6Townships, Project ID 102382

 

7Project Allocation

2,300,000

8(Base Project Allocation - $2,300,000)

 

9(17) SR 0051, Resurface, PA 51, Old Route
1051 Road to Redstone Creek Bridge,
11Cities of Uniontown and Connellsville,
12Masontown and Fairchance Boroughs,
13Georges, South Union, Franklin, North
14Union, Menallen, Springhill,
15Nicholson, German, Connellsville and
16Springfield Townships, Project ID
17102382

 

18Project Allocation

1,250,000

19(Base Project Allocation - $1,250,000)

 

20(18) SR 0051, Resurface, PA 51, Old Route
2151 Road to Redstone Creek Bridge,
22Cities of Uniontown and Connellsville,
23Masontown and Fairchance Boroughs,
24Georges, South Union, Franklin, North
25Union, Menallen, Springhill,
26Nicholson, German, Connellsville and
27Springfield Townships, Project ID
28102382

 

29Project Allocation

1,250,000

30(Base Project Allocation - $1,250,000)

 

1(19) SR 0166, Resurface, PA 166,
2Morgantown Road to PA 21, Cities of
3Uniontown and Connellsville, Masontown
4and Fairchance Boroughs, Georges,
5South Union, Franklin, North Union,
6Menallen, Springhill, Nicholson,
7German, Connellsville and Springfield
8Townships, Project ID 102382

 

9Project Allocation

2,400,000

10(Base Project Allocation - $2,400,000)

 

11(20) SR 3019, Resurface, SR 3019, Judith
12Street to Morgantown Street, Cities of
13Uniontown and Connellsville, Masontown
14and Fairchance Boroughs, Georges,
15South Union, Franklin, North Union,
16Menallen, Springhill, Nicholson,
17German, Connellsville and Springfield
18Townships, Project ID 102382

 

19Project Allocation

300,000

20(Base Project Allocation - $300,000)

 

21(21) SR 8025, Resurface, SR 8025, Mon
22Valley Expressway to Morgantown Road,
23Cities of Uniontown and Connellsville,
24Masontown and Fairchance Boroughs,
25Georges, South Union, Franklin, North
26Union, Menallen, Springhill,
27Nicholson, German, Connellsville and
28Springfield Townships, Project ID
29102382

 

30Project Allocation

150,000

1(Base Project Allocation - $150,000)

 

2(22) US 119, Resurface and
3Reconstruction, West Virginia State
4Line to 3002, Point Marion Borough,
5Springhill Township, Project ID 98435

 

6Project Allocation

725,000

7(Base Project Allocation - $725,000)

 

8(23) SR 0043, Resurface, PA 43, SR 8025
9to US 40, Cities of Uniontown and
10Connellsville, Masontown and
11Fairchance Boroughs, Georges, South
12Union, Franklin, North Union,
13Menallen, Springhill, Nicholson,
14German, Connellsville and Springfield
15Townships, Project ID 102382

 

16Project Allocation

650,000

17(Base Project Allocation - $650,000)

 

18(24) SR 0043, Resurface, PA 43, SR 8025
19to George C. Marshall Parkway, Cities
20of Uniontown and Connellsville,
21Masontown and Fairchance Boroughs,
22Georges, South Union, Franklin, North
23Union, Menallen Springhill, Nicholson,
24German, Connellsville and Springfield
25Townships, Project ID 102382

 

26Project Allocation

650,000

27(Base Project Allocation - $650,000)

 

28(25) SR 8025, Resurface, SR 8025,
29Fairchance Road to PA 43, Cities of
30Uniontown and Connellsville, Masontown

 

1and Fairchance Boroughs, Georges,
2South Union, Franklin, North Union,
3Menallen, Springhill, Nicholson,
4German, Connellsville and Springfield
5Townships, Project ID 102382

 

6Project Allocation

100,000

7(Base Project Allocation - $100,000)

 

8(26) SR 0857, Resurface, PA 857, Short
9Street to Wynn Road, Cities of
10Uniontown and Connellsville, Masontown
11and Fairchance Boroughs, Georges,
12South Union, Franklin, North Union,
13Menallen, Springhill, Nicholson,
14German, Connellsville and Springfield
15Townships, Project ID 102382

 

16Project Allocation

600,000

17(Base Project Allocation - $600,000)

 

18(27) SR 0711, Rehabilitation and
19Resurface, PA 711 from SR 1015 to PA
20381/PA 711, Springfield Township,
21Project ID 98434

 

22Project Allocation

2,843,000

23(Base Project Allocation - $2,843,000)

 

24(28) SR 1051, Resurface, SR 1051, Snyder
25Street to Crawford Avenue, Cities of
26Uniontown and Connellsville, Masontown
27and Fairchance Boroughs and Georges,
28South Union, Franklin, North Union,
29Menallen, Springhill, Nicholson,
30German, Connellsville and Springfield

 

1Townships, Project ID 102382

 

2Project Allocation

200,000

3(Base Project Allocation - $200,000)

 

4(29) PA 381, Resurface and
5Reconstruction, Negleyst to Bearrun,
6Ohiopyle Borough and Stewart Township,
7Project ID 98426

 

8Project Allocation

501,000

9(Base Project Allocation - $501,000)

 

10(30) SR 1073, Resurface, SR 1073,
11Crawford Avenue to Georgia Avenue,
12Cities of Uniontown and Connellsville,
13Masontown and Fairchance Boroughs,
14Georges, South Union, Franklin, North
15Union, Menallen, Springhill,
16Nicholson, German, Connellsville and
17Springfield Townships, Project ID
18102382

 

19Project Allocation

400,000

20(Base Project Allocation - $400,000)

 

21(31) SR 0982, Rehabilitation and
22Resurface, PA 982 from US 119 to SR
231044, Bullskin Township, Project ID
2498306

 

25Project Allocation

2,715,000

26(Base Project Allocation - $2,715,000)

 

27(32) SR 0381, Rehabilitation and
28Resurface, PA 381 from US 40 to
29Ohiopyle Borough Line, Ohiopyle
30Borough, Stewart and Wharton

 

1Townships, Project ID 98297

 

2Project Allocation

4,448,000

3(Base Project Allocation - $4,448,000)

 

4(33) Everson Interchange to TR 711,
5Concrete Rehabilitation, Bullskin and
6Connellsville Townships, Project ID
798293

 

8Project Allocation

471,000

9(Base Project Allocation - $471,000)

 

10(34) PA 381, Resurface and
11Reconstruction, PA 711 to Imel Road,
12Saltlick and Springfield Townships,
13Project ID 98427

 

14Project Allocation

518,000

15(Base Project Allocation - $518,000)

 

16(35) SR 0381, Rehabilitation and
17Resurface, PA 381 from Imel Road to
18Village of Melcroft, Saltlick
19Township, Project ID 98428

 

20Project Allocation

1,845,000

21(Base Project Allocation - $1,845,000)

 

22(36) SR 0381, Rehabilitation and
23Resurface, PA 381 from Melcroft to
24County Line, Saltlick Township,
25Project ID 98429

 

26Project Allocation

1,853,000

27(Base Project Allocation - $1,853,000)

 

28(37) US 40, Resurface and Reconstruction,
29PA 281 to Yough Bridge, Henry Clay
30Township, Project ID 98432

 

1Project Allocation

366,000

2(Base Project Allocation - $366,000)

 

3(38) SR 0381, Resurface, PA 381 from
4Falling Water to Mill Run, Springfield
5and Stewart Townships, Project ID
698425

 

7Project Allocation

5,614,000

8(Base Project Allocation - $2,807,000)

 

9(Design & Contingencies - $2,807,000)

 

10(39) SR 2027, Rehabilitation and
11Resurface, SR 2027 from Jones Drive to
12US 119, North Union Township and City
13of Uniontown, Project ID 98457

 

14Project Allocation

923,000

15(Base Project Allocation - $923,000)

 

16(40) SR 0381, Rehabilitation and
17Resurface, PA 381 from Bear Run to
18Village of Millrun, Springfield and
19Stewart Townships, Project ID 98499

 

20Project Allocation

1,500,000

21(Base Project Allocation - $1,500,000)

 

22(41) SR 0166, Resurface, PA 166 from PA
2321 to SR 4002, German and Redstone
24Townships, Project ID 99535

 

25Project Allocation

683,000

26(Base Project Allocation - $683,000)

 

27(42) SR 4029, Rehabilitation and
28Resurface, SR 4029 (State Street) from
29PA 906 to Broad Avenue, Belle Vernon
30Borough, Project ID 98497

 

1Project Allocation

165,000

2(Base Project Allocation - $165,000)

 

3(43) SR 0119, Resurface, US 119, Farm
4Road to SR 0043, Cities of Uniontown
5and Connellsville, Masontown and
6Fairchance Boroughs, Georges, South
7Union, Franklin, North Union,
8Menallen, Springhill, Nicholson,
9German, Connellsville and Springfield
10Townships, Project ID 102382

 

11Project Allocation

800,000

12(Base Project Allocation - $800,000)

 

13(44) SR 0381, Rehabilitation and
14Resurface, PA 381 from US 40 to Deer
15Lane, Stewart and Wharton Townships,
16Project ID 98495

 

17Project Allocation

1,500,000

18(Base Project Allocation - $1,500,000)

 

19(45) SR 0201, Rehabilitation and
20Resurface, PA 201 from US 119 to
21Vanderbilt Borough Line, City of
22Connellsville, Dunbar Township and
23Vanderbilt Borough, Project ID 98494

 

24Project Allocation

1,500,000

25(Base Project Allocation - $1,500,000)

 

26(46) SR0040, Resurface, US 40 Westbound
27and Eastbound from US 119 to SR 4039
28(North Gate Highway), Menallen, North
29Union and South Union Townships,
30Project ID 98418

 

1Project Allocation

392,000

2(Base Project Allocation - $392,000)

 

3(47) SR 0201, Rehabilitation and
4Resurface, PA 201 from Vanderbilt
5Borough Line (Northern) to SR 4028 at
6Flatwoods, Dunbar and Franklin
7Townships, Vanderbilt Borough, Project
8ID 98876

 

9Project Allocation

2,513,000

10(Base Project Allocation - $2,513,000)

 

11(48) SR 0381, Rehabilitation and
12Resurface, PA 381 From Deer Lane to
13Ohiopyle Borough Line (Southern),
14Stewart Township, Project ID 98498

 

15Project Allocation

1,575,000

16(Base Project Allocation - $1,575,000)

 

17(49) SR 0982, Rehabilitation and
18Resurface, PA 982 from US 119 to TR
19819 (Eutsey Road), Bullskin Township,
20Project ID 98492

 

21Project Allocation

1,000,000

22(Base Project Allocation - $1,000,000)

 

23(50) PA 43, Resurface and Reconstruction,
24Wynn Road to US 40, Georges and South
25Union Townships, Project ID 98490

 

26Project Allocation

809,000

27(Base Project Allocation - $809,000)

 

28(51) US 119, Resurface and
29Reconstruction, US 3009 to SR 3014,
30Georges, Nicholson and Springhill

 

1Townships and Smithfield Borough,
2Project ID 98419

 

3Project Allocation

512,000

4(Base Project Allocation - $512,000)

 

5(52) US 40, Resurface and Reconstruction,
6US 119 to Lick Run, South Union
7Township, Project ID 98488

 

8Project Allocation

942,000

9(Base Project Allocation - $942,000)

 

10(53) PA 51, Resurface and Reconstruction,
11Arch Street to Short Street, North
12Union Township and City of Uniontown,
13Project ID 98420

 

14Project Allocation

170,000

15(Base Project Allocation - $170,000)

 

16(54) US 119, Resurface and
17Reconstruction, SR 3014 to SR 3019,
18Georges and South Union Townships,
19Project ID 98421

 

20Project Allocation

633,000

21(Base Project Allocation - $633,000)

 

22(55) SR 4001, Rehabilitation and
23Resurface, SR 4001 (Rush Run Road)
24from Village of Dearth to Rush Run,
25Luzerne Township, Project ID 98481

 

26Project Allocation

1,875,000

27(Base Project Allocation - $1,875,000)

 

28(56) SR 0982, Rehabilitation and
29Resurface, PA 982 from Eutsey Road (TR
30819) to US 31 (Mammoth Road), Bullskin

 

1Township, Project ID 98493

 

2Project Allocation

1,000,000

3(Base Project Allocation - $1,000,000)

 

4(57) US 40, Resurface and Reconstruction,
5PA 43 to Dearth Road, Menallen and
6Redstone Townships, Project ID 98505

 

7Project Allocation

691,000

8(Base Project Allocation - $691,000)

 

9(58) SR 0281, Rehabilitation and
10Resurface, PA 281 from Tub Run to
11Cowden Road, Henry Clay Township,
12Project ID 98873

 

13Project Allocation

3,540,000

14(Base Project Allocation - $3,540,000)

 

15(59) SR 0201, Rehabilitation and
16Resurface, PA 201 from Bank Street to
17Lake Road, Dunbar and Franklin
18Townships, Vanderbilt Borough, Project
19ID 98496

 

20Project Allocation

1,010,000

21(Base Project Allocation - $1,010,000)

 

22(60) SR 0281, Rehabilitation and
23Resurface, PA 281 from US 40 to Tub
24Run, Henry Clay Township, Project ID
2598292

 

26Project Allocation

1,965,000

27(Base Project Allocation - $1,965,000)

 

28(61) US 119, Resurface and
29Reconstruction, SR 3002 to SR 3009,
30Nicholson and Springhill Townships,

 

1Project ID 98422

 

2Project Allocation

447,000

3(Base Project Allocation - $447,000)

 

4(62) SR 0166, Resurface, PA 166 from
5Point Marion to SR 3006, Nicholson and
6Springhill Townships, Project ID 98423

 

7Project Allocation

619,000

8(Base Project Allocation - $619,000)

 

9(63) SR 0381, Resurface, PA 381 from Mill
10Run to PA 281, Springfield Township,
11Project ID 98424

 

12Project Allocation

506,000

13(Base Project Allocation - $506,000)

 

14(64) SR 0166, Resurface, PA 1666 from
15Masontown to SR 3006, German and
16Nicholson Townships, Project ID 98411

 

17Project Allocation

3,697,000

18(Base Project Allocation - $3,697,000)

 

19(65) PA 21, Resurface and Reconstruction,
20River Avenue to PA 166, German
21Township and Masontown Borough,
22Project ID 98417

 

23Project Allocation

773,000

24(Base Project Allocation - $773,000)

 

25(66) SR 1073, Rehabilitation and
26Resurface, SR 1073 (Crawford Avenue
27Extension), City of Connellsville,
28Connellsville Township, Project ID
2998504

 

30Project Allocation

720,000

1(Base Project Allocation - $720,000)

 

2(67) SR 7224, Workman Road over Big Sandy
3Creek, Bridge Replacement, SR 7224,
4Wharton Township, Project ID 101958

 

5Project Allocation

296,000

6(Base Project Allocation - $200,000)

 

7(Land Allocation - $5,000)

 

8(Design & Contingencies - $91,000)

 

9(68) US 40, Resurface and Reconstruction,
10PA 281 to Yough Bridge, Henry Clay
11Township, Project ID 98502

 

12Project Allocation

366,000

13(Base Project Allocation - $366,000)

 

14(69) SR 0201, Rehabilitation and
15Resurface, PA 201 from PA 906 to
16Westmoreland County Line, Fayette City
17Borough and Washington Township,
18Project ID 98501

 

19Project Allocation

1,170,000

20(Base Project Allocation - $1,170,000)

 

21(70) SR 0381, Rehabilitation and
22Resurface, PA 381 from King Road (T-
23523) to Bear Run, Ohiopyle Borough and
24Stewart Township, Project ID 98500

 

25Project Allocation

1,250,000

26(Base Project Allocation - $1,250,000)

 

27(71) SR 0201, Rehabilitation and
28Resurface, PA 201 from SR 4028 to PA
2951, Franklin and Perry Townships,
30Project ID 98415

 

1Project Allocation

4,405,000

2(Base Project Allocation - $4,405,000)

 

3Section 327. Forest County.

4Projects are as follows:

 

5(1) (Reserved).

 

6(2) SR 4001, Resurface, SR 4001
7(Neilltown Road) and SR 2002 (River
8Road), Barnett, Harmony and Tionesta
9Townships, Project ID 91023

 

10Project Allocation

551,000

11(Base Project Allocation - $551,000)

 

12(3) SR 0227, Restoration and Resurfacing,
13SR 0227 (Butcher Knife Hill Road) from
14the Venango County Line to Fleming
15Hill Road, and SR 3004 (Guittonville
16Road) from Jones Farm Road to SR 0066,
17Green, Harmony, Jenks and Kingsley
18Townships, Project ID 96883

 

19Project Allocation

2,488,000

20(Base Project Allocation - $2,488,000)

 

21(4) SR 0899, Safety Improvement – Slide
22Correction, SR 0899 in Barnett
23Township, Forest County and SR 0062 in
24Watson Township, Warren County,
25Barnett and Watson Townships, Project
26ID 96361

 

27Project Allocation

1,701,000

28(Base Project Allocation - $1,501,000)

 

29(Design & Contingencies - $200,000)

 

30(5) SR 0666, Retaining Wall, SR 0666

 

1(David Zeisberger Highway), Howe
2Township, Project ID 97041

 

3Project Allocation

1,500,000

4(Base Project Allocation - $1,500,000)

 

5(6) SR 0666, Retaining Wall, SR 0666
6(David Zeisberger Highway), Howe
7Township, Project ID 97040

 

8Project Allocation

1,000,000

9(Base Project Allocation - $1,000,000)

 

10(7) SR 3001, Resurface, SR 3006, SR 3001
11from Red Brush Road to Smokey Hill
12Road, SR 3002 (Stewart Run Road) and
13SR 3004 to Oak Woods Road, Green,
14Jenks, Kinsley and Tionesta Townships,
15Project ID 89181

 

16Project Allocation

3,110,000

17(Base Project Allocation - $3,110,000)

 

18(8) SR 0062, Restoration and Resurface,
19SR 0062 (Elm Street) from Tionesta
20Borough to West Hickory, Hickory and
21Tionesta Townships, Project ID 97900

 

22Project Allocation

587,000

23(Base Project Allocation - $506,000)

 

24(Design & Contingencies - $81,000)

 

25(9) SR 0899, Restoration and Resurface,
26SR 0899 from Bear Run Road to SR 0066,
27Barnett and Jenks Townships, Project
28ID 97895

 

29Project Allocation

5,000,000

30(Base Project Allocation - $5,000,000)

 

1(10) SR 0948, Restoration and Resurface,
2SR 0948 from Elk County Line to Warren
3County Line, Howe Township, Project ID
497893

 

5Project Allocation

1,500,000

6(Base Project Allocation - $1,500,000)

 

7(11) SR 0036, Restoration and Resurface,
8SR 0036 (Col Drake Highway) from
9Clarion County Line to Tionesta Dam
10Road, Green and Tionesta Townships,
11Project ID 97891

 

12Project Allocation

2,550,000

13(Base Project Allocation - $2,500,000)

 

14(12) SR 0036, Restoration and Resurface,
15SR 0036 (Col Drake Highway) from the
16Venango County Line to Tionesta and
17Harmony Townships, Project ID 97890

 

18Project Allocation

1,000,000

19(Base Project Allocation - $1,000,000)

 

20(13) SR 0127, Restoration and Resurface,
21SR 0127 (Main Street) from Fleming
22Hill Road to Warren County Line and SR
234001 (Neilltown Road) from SR 0036 to
24Warren County Line, Harmony and
25Tionesta Townships, Project ID 97868

 

26Project Allocation

1,812,000

27(Base Project Allocation - $1,812,000)

 

28(14) SR 0227, Resurface, SR 0227 (Butcher
29Knife Hill Road) from the Venango
30County Line, Harmony Township, Project

 

1ID 89179


2Project Allocation

1,100,000

3(Base Project Allocation - $1,100,000)

 

4(15) SR 3005, Resurface, SR 3005 (Sage
5Road) from Clarion County Line to
6Golinza Road, Green and Tionesta
7Townships, Project ID 99853

 

8Project Allocation

525,000

9(Base Project Allocation - $525,000)

 

10(16) SR 2005, Resurface, SR 2005 (Loleta
11Road/Forest Street) from the Elk
12County Line to Beaver Meadows Road
13with coordination with Knox and Kane
14Railroad Company (Dot #148537a)
15Barnett and Jenks Townships, Project
16ID 99834

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(17) SR 3004, Resurface, SR 3004 (Little
20Hickory Road) from SR 0062 to German
21Hill Road, Green and Hickory
22Townships, Project ID 99851

 

23Project Allocation

822,000

24(Base Project Allocation - $822,000)

 

25(18) SR 3003, Resurface, SR 3003
26(Waltonbaugh Road/Shriver Road) from
27Stitzinger Road to SR 0036, Tionesta
28Township, Project ID 99849

 

29Project Allocation

300,000

30(Base Project Allocation - $300,000)

 

1(19) SR 4002, Resurface, SR 4002 (Dawson
2Road) from Jamison Road to Fleming
3Hill Road, Harmony and Tionesta
4Townships, Project ID 99823

 

5Project Allocation

625,000

6(Base Project Allocation - $625,000)

 

7(20) SR 2002, Resurface, Restoration and
8Reconstruction, Clarion County Line to
9Greenwood Road, Barnett Township,
10Project ID 102543

 

11Project Allocation

1,200,000

12(Base Project Allocation - $1,200,000)

 

13(21) SR 3006, Resurface, SR 3006 (Smokey
14Hill Road) from Red Brush Road to SR
150036, Tionesta Township, Project ID
1699820

 

17Project Allocation

20,000

18(Base Project Allocation - $20,000)

 

19(22) SR 2001, Resurface, SR 2001
20(Greenwood Road)) from SR 0089 to Coon
21Road, Barnett Township, Project ID
2299819

 

23Project Allocation

520,000

24(Base Project Allocation - $520,000)

 

25(23) SR 0899, Resurface, SR 0899 from the
26Jefferson County Line to Bear Run
27Road, Barnett Township, Project ID
2899811

 

29Project Allocation

1,651,000

30(Base Project Allocation - $1,601,000)

 

1(Design & Contingencies - $50,000)

 

2(24) SR 0066, Resurface and Restoration,
3SR 0066 from Birch Street to Blue Jay
4Road, Howe and Jenks Townships,
5Project ID 99074

 

6Project Allocation

2,200,000

7(Base Project Allocation - $2,200,000)

 

8(25) SR 0062, Resurface and Restoration,
9SR 0062 (Oil City Road/Elm Street)
10from SR 0036 through Tionesta Borough,
11Tionesta Borough and Tionesta
12Township, Project ID 99086

 

13Project Allocation

2,299,000

14(Base Project Allocation - $2,299,000)

 

15(26) SR 4008, Resurface, SR 4002 (Grange
16Hill Road) from Little Hickory Road to
17Dutch Hill Road, Green and Kingsley
18Townships, Project ID 99825

 

19Project Allocation

310,000

20(Base Project Allocation - $310,000)

 

21(27) SR 3014, Highway Restoration,
22Various State Routes, Various
23Municipalities, Project ID 87526

 

24Project Allocation

500,000

25(Base Project Allocation - $500,000)

 

26Section 328. Franklin County.

27Projects are as follows:

 

28(1) (Reserved).

 

29(2) SR 0081, Safety Improvement,
30Intersection of SR 1010 (Walker Road)

 

1and I-81, Chambersburg Borough and
2Greene Township, Project ID 93197

 

3Project Allocation

92,000

4(Base Project Allocation - $31,000)

 

5(Land Allocation - $6,000)

 

6(Design and Contingencies - $55,000)

 

7(3) SR 0081, New Interchange, I-81
8between PA 914 (Swamp Fox Road) and PA
9316 (Wayne Avenue), Guilford Township,
10Project ID 93055

 

11Project Allocation

26,193,000

12(Base Project Allocation - $6,893,000)

 

13(Land Allocation - $3,447,000)

 

14(Design and Contingencies –
15$15,853,000)

 

16(4) SR 0997, Curve Realignment, PA 997
17(Anthony Highway), Washington
18Township, Project ID 97159

 

19Project Allocation

200,000

20(Base Project Allocation - $200,000)

 

21(5) I-81, Highway Reconstruction, I-81
22from One Mile South of Browns Mills to
23One Mile North of Guilford Township
24Line, Antrim, Greene, Guilford and
25Hamilton Townships, Project ID 92179

 

26Project Allocation

720,000

27(Base Project Allocation - $700,000)

 

28(Design & Contingencies - $20,000)

 

29(6) SR 0011, Resurface, US 11 from
30Eisenhower Drive to S. Penn Hall Drive

 

1(Northbound and Southbound),
2Chambersburg Borough, Project ID 88979

 

3Project Allocation

502,000

4(Base Project Allocation - $475,000)

 

5(Land Allocation - $6,000)

 

6(Design & Contingencies - $21,000)

 

7(7) SR 0011, Safety Improvement, SR 0011,
8SR 0030 and SR 0316, Chambersburg
9Borough, Guilford and Hamilton
10Townships, Project ID 94744

 

11Project Allocation

577,000

12(Base Project Allocation - $577,000)

 

13(8) SR 0011, Lane Widening and
14Restriping, Possible Signal Upgrade,
15Intersection of US 11 and PA 997,
16Greene Township, Project ID 86970

 

17Project Allocation

702,000

18(Base Project Allocation - $557,000)

 

19(Land Allocation - $111,000)

 

20(Design & Contingencies – $34,000)

 

21(9) SR 0016, Resurface, PA 16 from PA 75
22to the Fulton County Line, Mercersburg
23Borough and Peters Township, Project
24ID 90914

 

25Project Allocation

487,000

26(Base Project Allocation - $345,000)

 

27(Land Allocation - $41,000)

 

28(Design & Contingencies - $101,000)

 

29(10) SR 2010, Resurface, SR 2010 (Old
30Route 16) from PA 16 to PA 16,

 

1Washington Township, Project ID 91184

 

2Project Allocation

875,000

3(Base Project Allocation - $875,000)

 

4(11) SR 0030, Highway Portion Bridge
5Replacement, SR 0030 Lincoln Highway
6over a Tributary of Back Creek,
7Hamilton Township, Project ID 90324

 

8Project Allocation

897,000

9(Base Project Allocation - $585,000)

 

10(Land Allocation - $78,000)

 

11(Design & Contingencies - $234,000)

 

12(12) SR 0081, Mill and Resurface, Bridge
13Preservation, I-81 from Maryland Line
14to Milepost 18, Antrim, Greene,
15Guilford and Hamilton Townships,
16Project ID 92006

 

17Project Allocation

4,497,000

18(Base Project Allocation - $4,308,000)

 

19(Design & Contingencies - $189,000)

 

20(13) SR 2016, Resurface, SR 2016 (Clay
21Hill Road) from SR 2021 (West of Hades
22Church Road) to PA 316, Antrim and
23Quincy Townships, Project ID 91185

 

24Project Allocation

1,461,000

25(Base Project Allocation - $1,361,000)

 

26(Design & Contingencies - $100,000)

 

27(14) SR 0533, Resurface, PA 533 from
28Letterkenny Township Line to
29Cumberland County Line, Letterkenny
30Township, Orrstown and Shippensburg

 

1Boroughs, Southampton Township,
2Project ID 90905

 

3Project Allocation

2,589,000

4(Base Project Allocation - $2,589,000)

 

5(15) SR 0997, Resurface, PA 997 from PA
616 to Nunnery Road, Quincy and
7Washington Townships and Waynesboro
8Borough, Project ID 86503

 

9Project Allocation

466,000

10(Base Project Allocation - $351,000)

 

11(Land Allocation - $40,000)

 

12(Design & Contingencies - $75,000)

 

13(16) SR 4015, Resurface, SR 4015
14(Franklin Street) from US 30 to
15Borough Line, Chambersburg Borough,
16Hamilton Township, Project ID 86506

 

17Project Allocation

93,000

18(Base Project Allocation - $1,000)

 

19(Land Allocation - $41,000)

 

20(Design & Contingencies - $51,000)

 

21(17) SR 4004, Resurface, SR 4004 (Horse
22Valley Road) from Forest Road to PA
23533, Letterkenny Township, Project ID
2491187

 

25Project Allocation

755,000

26(Base Project Allocation - $755,000)

 

27(18) SR 0016, Resurface, PA 16 from PA 75
28to Seminary Lane, Mercersburg Borough
29and Montgomery Township, Project ID
3090898

 

1Project Allocation

804,000

2(Base Project Allocation - $804,000)

 

3(19) SR 0016, Repair Retaining Wall, PA
416 North of Red Run to South of
5Recycle Center Lane, Washington
6Township, Project ID 90205

 

7Project Allocation

1,200,000

8(Base Project Allocation - $1,200,000)

 

9(20) SR 0030, Highway Portion Bridge
10Replacement, SR 0030 Lincoln Highway
11over Tributary of Back Creek, Hamilton
12Township, Project ID 90323

 

13Project Allocation

424,000

14(Land Allocation - $106,000)

 

15(Design & Contingencies - $318,000)

 

16(21) SR 0233, Rehabilitation and
17Resurface, PA 233 (Mont Alto Road/Rock
18Mountain Road) from PA 997 (Anthony
19Highway) to US 30 (Lincoln Highway)
20Greene and Guilford Townships, Mont
21Alto Borough, Quincy Township, Project
22ID 96291

 

23Project Allocation

4,402,000

24(Base Project Allocation - $4,401,000)

 

25(Design & Contingencies - $1,000)

 

26(22) SR 1006, Resurface, SR 1006 (Main
27Street) from PA 997 to PA 997, Greene
28Township, Project ID 79700

 

29Project Allocation

5,950,000

30(Base Project Allocation - $4,500,000)

 

1(Land Allocation - $700,000)

 

2(Design & Contingencies – $750,000)

 

3(23) SR 0081, Interchange Improvements,
4I-81 Intersection US 11 at I-81 (Exit
53), Antrim Township, Project ID 87201

 

6Project Allocation

851,000

7(Design & Contingencies - $851,000)

 

8(24) SR 2007, Roundabout, SR 2007 (Old
9Forge Road) at Washington Township
10Boulevard, Washington Township,
11Project ID 97147

 

12Project Allocation

2,000,000

13(Base Project Allocation - $2,000,000)

 

14(25) SR 0416, Rehabilitation and
15Resurface, PA 416 (Mercersburg Road)
16from the Pennsylvania/Maryland State
17Line to PA 995 (Welsh Run Road),
18Montgomery Township, Project ID 96367

 

19Project Allocation

2,102,000

20(Base Project Allocation - $2,101,000)

 

21(Design & Contingencies - $1,000)

 

22(26) SR 0081, Realignment, I-81 (American
23Legion Memorial Highway) Exit 5,
24Antrim Township, Project ID 97193

 

25Project Allocation

6,500,000

26(Design & Contingencies - $6,500,000)

 

27(27) SR 0456, Resurface, PA 456 from
28Maryland State Line to Little Cove
29Creek, Warren Township, Project ID
3090918

 

1Project Allocation

3,315,000

2(Base Project Allocation - $3,315,000)

 

3(28) SR 0696, Resurface, Portions of
4Various Roadways, Guilford, Peters,
5Quincy, Saint Thomas, Southampton and
6Washington Townships, Project ID 90214

 

7Project Allocation

5,500,000

8(Base Project Allocation - $4,000,000)

 

9(Land Allocation - $700,000)

 

10(Design & Contingencies – $800,000)

 

11(29) SR 0075, Resurface, SR 0075 from SR
120274 to Huntingdon County Line,
13Fannett Township, Project ID 97964

 

14Project Allocation

280,000

15(Base Project Allocation - $280,000)

 

16(30) SR 0016, Safety Improvement, SR 0016
17Interchange with I-81, Antrim
18Township, Project ID 95662

 

19Project Allocation

300,000

20(Base Project Allocation - $300,000)

 

21(31) SR 0081, Highway Portion of Bridge
22Rehabilitation, I-81 over SR 2002
23(Leitersburg Road), Antrim Township,
24Project ID 95498

 

25Project Allocation

1,536,000

26(Base Project Allocation - $1,536,000)

 

27(32) SR 0030, Highway Portion Bridge
28Replacement, SR 0030 (Lincoln Highway)
29over a Tributary of Back Creek, Saint
30Thomas Township, Project ID 90322

 

1Project Allocation

1,172,000

2(Base Project Allocation - $764,000)

 

3(Land Allocation - $102,000)

 

4(Design & Contingencies - $306,000)

 

5(33) SR 0016, Resurface, PA 16 from SR
62025 (Grindstone Hill Road) to
7Waynesboro Borough Line and Antrim and
8Washington Townships, Project ID 90989

 

9Project Allocation

3,831,000

10(Base Project Allocation - $3,800,000)

 

11(Land Allocation - $6,000)

 

12(Design & Contingencies - $25,000)

 

13(34) SR 0192, Intersection Improvement,
14Safety Improvement, SR 0995 and Tallow
15Hill Road Intersection, Hamilton
16Township, Project ID 86969

 

17Project Allocation

170,000

18(Base Project Allocation - $40,000)

 

19(Land Allocation - $100,000)

 

20(Design & Contingencies - $30,000)

 

21(35) SR 0416, Resurface, PA 416 from PA
2216 to PA 995, Montgomery Township,
23Project ID 91183

 

24Project Allocation

1,360,000

25(Base Project Allocation - $1,360,000)

 

26(36) SR 3004, Highway Portion Bridge
27Preservation, SR 3004 (Bino Road) over
28Conococheague Creek, Antrim and
29Montgomery Townships, Project ID 99967

 

30Project Allocation

729,000

1(Base Project Allocation - $729,000)

 

2(37) SR 0016, Resurface, PA 16 (Buchanan
3Trail) from Skyway Road to South of SR
42023 (Fort Richie Access Road),
5Washington Township, Project ID 99810

 

6Project Allocation

1,250,000

7(Base Project Allocation - $1,250,000)

 

8(38) SR 0011, Resurface, US 11 (Molly
9Pitcher Highway) from South of SR 2016
10(Kaufman Road) to Main Street, Antrim
11and Guilford Townships, Project ID
12100308

 

13Project Allocation

1,500,000

14(Base Project Allocation - $1,500,000)

 

15(39) I-81, Reconstruction, I-81 from the
16Maryland State Line to the Cumberland
17County Line, Various Municipalities,
18Project ID 0

 

19Project Allocation

103,200,000

20(Base Project Allocation -
21$103,200,000)

 

22(40) SR 0030, Resurface, US 30 (Lincoln
23Highway) from SR 1008 (Main Street) to
24Adams County Line, Greene and Guilford
25Townships, Project ID 100303

 

26Project Allocation

665,000

27(Base Project Allocation - $665,000)

 

28(41) SR 1004, Highway Portion Bridge
29Preservation, SR 1004 (Scotland Road)
30over Conococheague Creek, Greene

 

1Township, Project ID 100269

 

2Project Allocation

731,000

3(Base Project Allocation - $731,000)

 

4(42) SR 2002, Highway Portion Bridge
5Replacement, SR 2002 (Leitersburg
6Road) over Marsh Run, Antrim and
7Washington Townships, Project ID
8100042

 

9Project Allocation

750,000

10(Base Project Allocation - $750,000)

 

11(43) Parkwood Drive, New Roadway, Extend
12Parkwood Drive between Norland Avenue
13and Grand Point Road (T-524), Greene
14Township, Project ID 101504

 

15Project Allocation

6,000,000

16(Base Project Allocation - $6,000,000)

 

17(44) SR 0016, Resurface, PA 16 (Main
18Street) from West Branch of Antiem
19Creek to Falls Creek, Washington
20Township, Waynesboro Borough, Project
21ID 100287

 

22Project Allocation

1,500,000

23(Base Project Allocation - $1,500,000)

 

24Section 329. Fulton County.

25Projects are as follows,

 

26(1) (Reserved).

 

27(2) SR 0070, Mill and Overlay, I-70
28Eastbound from Amaranth Interchange to
29Bedford County Line, Bethel, Brush
30Creek and Union Townships, Project ID

 

191537

 

2Project Allocation

4,218,000

3(Base Project Allocation - $4,218,000)

 

4(3) SR 1007, Resurface, Patterson Run
5Road (SR 1007) from US 30 to US 522,
6Dublin and Licking Creek Townships,
7Project ID 91652

 

8Project Allocation

1,600,000

9(Base Project Allocation - $1,600,000)

 

10(4) SR 0522, Resurface, US 522 to PA 643
11to PA 655, Belfast and Bethel
12Townships, Project ID 91650

 

13Project Allocation

600,000

14(Base Project Allocation - $600,000)

 

15(5) SR 0475, Widen Turn Radius, PA 475
16Intersection with SR 4014 (Pitt
17Street), Near Village of Houstontown,
18Dublin and Taylor Townships, Project
19ID 37226

 

20Project Allocation

899,000

21(Base Project Allocation - $201,000)

 

22(Land Allocation - $691,000)

 

23(Design & Contingencies - $7,000)

 

24(6) SR 0475, Highway Restoration, Widen,
25Drainage and Resurfacing, Waterfall
26Road (PA 475) from US 522 to Taylor
27Road (T-432), Dublin Township, Project
28ID 48015

 

29Project Allocation

678,000

30(Base Project Allocation - $478,000)

 

1(Land Allocation - $100,000)

 

2(Design & Contingencies - $100,000)

 

3(7) SR 0070, Mill and Overlay, I-70
4Westbound from Amaranth Interchange to
5Bedford County Line, Bethel, Brush
6Creek and Union Townships, Project ID
791536

 

8Project Allocation

3,943,000

9(Base Project Allocation - $3,943,000)

 

10(8) SR 3017, Resurface, SR 3017 from I-70
11Townhill Interchange to the Bedford
12County Line and SR 4011 from Dublin
13Mills Road to PA 655, Brush Creek and
14Taylor Townships, Project ID 91654

 

15Project Allocation

450,000

16(Base Project Allocation - $450,000)

 

17(9) SR 0915, Resurface, PA 915 from US 30
18to Bedford County Line, Brush Creek
19and Wells Townships, Project ID 97861

 

20Project Allocation

760,000

21(Base Project Allocation - $760,000)

 

22(10) SR 0022, Corridor Safety
23Improvements, PA 475 from Intersection
24of PA 522 to Intersection of Cole Road
25(T-434), Dublin Township, Project ID
2688191

 

27Project Allocation

200,000

28(Base Project Allocation - $200,000)

 

29(11) SR 0655, Resurface, PA 655 from T-
30381 Blairs Hill Road to SR 2005 Timber

 

1Ridge Road, Belfast Township, Project
2ID 91653

 

3Project Allocation

1,500,000

4(Base Project Allocation - $1,500,000)

 

5(12) SR 0915, Resurface, PA 915 from SR
63023 to US 30, Brush Creek Township,
7Project ID 91655

 

8Project Allocation

300,000

9(Base Project Allocation - $300,000)

 

10(13) SR 0655, Resurface, PA 655 from
11Dublin Mills Road (SR 4008) to
12Huntingdon County Line, Taylor
13Township, Project ID 96550

 

14Project Allocation

700,000

15(Base Project Allocation - $700,000)

 

16(14) SR 0522, Resurface, US 522 from SR
171004 to I-76 PA Turnpike, Dublin and
18Todd Townships and McConnellsburg
19Borough, Project ID 96543

 

20Project Allocation

10,800,000

21(Base Project Allocation -
22$10,000,000)

 

23(Land Allocation - $800,000)

 

24(15) SR 0016, Resurface, PA 16 from
25Lincoln Way West (SR 1004) to Franklin
26County Line, Ayr and Todd Townships
27and McConnellsburg Borough, Project ID
2896544

 

29Project Allocation

1,400,000

30(Base Project Allocation - $1,400,000)

 

1(16) SR 0655, Resurface, PA 655 from
2Village of Needmore to US 522, Belfast
3Township, Project ID 96545

 

4Project Allocation

500,000

5(Base Project Allocation - $500,000)

 

6(17) SR 0030, Resurface, US 30 from the
7Bedford County Line to the Sipes Mill
8Road (SR 4001), Brush Creek and
9Licking Creek Townships, Project ID
1096546

 

11Project Allocation

1,900,000

12(Base Project Allocation - $1,900,000)

 

13(18) SR 0030, Resurface, US 30 from
14McConnellsburg Bypass to the Franklin
15County Line, Ayr and Todd Townships,
16Project ID 96547

 

17Project Allocation

86,000

18(Base Project Allocation - $86,000)

 

19(19) SR 0655, Highway Reconstruction, PA
20655 from Village of Needmore to US
21522, Belfast Township, Project ID
2291651

 

23Project Allocation

300,000

24(Base Project Allocation - $300,000)

 

25(20) SR 0655, Resurface, PA 655 from Pitt
26Street from Dublin Mills Road (SR
274008), Taylor Township, Project ID
2896548

 

29Project Allocation

1,300,000

30(Base Project Allocation - $1,300,000)

 

1(21) SR 0484, Resurface, PA 484 from
2Fingerboard Road to PA 655, Bethel,
3Thompson and Union Townships, Project
4ID 96342

 

5Project Allocation

2,500,000

6(Base Project Allocation - $2,500,000)

 

7(22) SR 1004, Resurface, Lincoln Way West
8Street (SR 1004) from US 30 to US 522,
9Ayr Township, McConnellsburg Borough,
10Todd Township, Project ID 96551

 

11Project Allocation

114,000

12(Base Project Allocation - $114,000)

 

13(23) SR 1006, Resurface, Lincoln Way East
14(SR 1006) from PA 16 to US 30, Ayr and
15Todd Townships, Project ID 96552

 

16Project Allocation

400,000

17(Base Project Allocation - $400,000)

 

18(24) SR 3004, Resurface, McKees Gap Road
19(SR 3004) from the Bedford County Line
20to PA 731, Union Township, Project ID
2196554

 

22Project Allocation

700,000

23(Base Project Allocation - $700,000)

 

24(25) SR 3006, Resurface, Mill Hill Road
25(SR 3006) from Deneens Gap Road (SR
263007) to I-70, Bethel Township,
27Project ID 96555

 

28Project Allocation

700,000

29(Base Project Allocation - $700,000)

 

30(26) SR 4001, Resurface, Sipes Mill Road

 

1(SR 4001) from Blairs Hill Road (T-
2381) to US 30, Belfast and Licking
3Creek Townships, Project ID 96556

 

4Project Allocation

2,000,000

5(Base Project Allocation - $2,000,000)

 

6(27) SR 4005, Resurface, Pleasant Valley
7Road (SR 4005) from South Valley Road
8(PA 915) to PA 915, Brush Creek
9Township, Project ID 96557

 

10Project Allocation

1,500,000

11(Base Project Allocation - $1,500,000)

 

12(28) SR 4007, Resurface, Little Egypt
13Road (SR 4007) from US 30 to North
14Hess Road (SR 4004), Licking Creek and
15Taylor Townships, Project ID 96566

 

16Project Allocation

1,400,000

17(Base Project Allocation - $1,400,000)

 

18(29) SR 0522, Resurface, PA 522 from
19Village of Webster Mills to Fulton
20Road (SR 1016), Ayr Township,
21McConnellsburg Borough, Project ID
2292619

 

23Project Allocation

5,351,000

24(Base Project Allocation - $5,000,000)

 

25(Land Allocation - $351,000)

 

26(30) I-70, Reconstruction, I-70 from the
27Maryland State Line to the Bedford
28County Line, Various Municipalities,
29Project ID 0

 

30Project Allocation

79,000,000

1(Base Project Allocation -
2$79,000,000)

 

3Section 330. Greene County.

4Projects are as follows:

 

5(1) (Reserved).

 

6(2) SR 0019, Highway Reconstruction, SR
70019 Segments 0300 to 0350, Franklin
8Township and Waynesburg Borough,
9Project ID 88307

 

10Project Allocation

3,500,000

11(Base Project Allocation - $3,500,000)

 

12(3) I-70 and I-79, Installation of
13Equipment, Greene, Washington and
14Westmoreland Counties, Various
15Municipalities, Project ID 93203

 

16Project Allocation

4,400,000

17(Base Project Allocation - $4,000,000)

 

18(Design & Contingencies - $400,000)

 

19(4) SR 0021, Pavement Preservation, PA
2021, West Virginia Line to Ryerson Park
21Road, Richhill Township, Project ID
2290929

 

23Project Allocation

570,000

24(Base Project Allocation - $570,000)

 

25(5) SR 2003, Intersection Reconstruction,
26SR 2003 at SR 2028, Franklin Township,
27Project ID 96659

 

28Project Allocation

3,198,000

29(Base Project Allocation - $2,001,000)

 

30(Land Allocation - $319,000)

 

1(Design & Contingencies - $878,000)

 

2(6) SR 0018, Resurface, 5.87 Miles of SR
30018 from Segments 0300/0000 to
40420/0000, Center and Franklin
5Townships, Project ID 73513

 

6Project Allocation

836,000

7(Base Project Allocation - $836,000)

 

8(7) SR 1016, Highway Portion Bridge
9Replacement, SR 1016 over Little
10Whitely Creek, Monongahela Township,
11Project ID 79349

 

12Project Allocation

4,702,000

13(Base Project Allocation - $3,716,000)

 

14(Land Allocation - $314,000)

 

15(Design & Contingencies - $672,000)

 

16(8) SR 2026, Highway Portion Bridge
17Replacement, SR 2026 over Laurel Run,
18Franklin Township, Project ID 79356

 

19Project Allocation

1,062,000

20(Base Project Allocation - $739,000)

 

21(Land Allocation - $91,000)

 

22(Design & Contingencies - $232,000)

 

23(9) SR 0019, Slide Repair, Franklin,
24Jefferson and Washington Townships,
25Greene County, US 19, Segments
260420/0550-0420/0950, I-70, 0120/1710-
270124/0450, PA 88, 0400/2100-0410/0900,
28Franklin, Jefferson and Washington
29Townships, Project ID 95358

 

30Project Allocation

593,000

1(Base Project Allocation - $593,000)

 

2(10) SR 0019, Resurface, US 19, Morris
3Street to Good Hill Road, Waynesburg
4Borough, Franklin, Washington and
5Wayne Townships, Project ID 102387

 

6Project Allocation

1,250,000

7(Base Project Allocation - $1,250,000)

 

8(11) SR 2018, Rehabilitation and
9Resurface, SR 2018, Kirby Road/Garads
10Fort Road, Franklin, Greene and
11Whiteley Townships, Project ID 98378

 

12Project Allocation

7,080,0000

13(Base Project Allocation - $7,080,000)

 

14(12) SR 0088, Rehabilitation and
15Resurface, PA 88 from Mapletown Bank
16to SR 2027 (Colvin Road), Monongahela
17Township, Project ID 98402

 

18Project Allocation

2,303,000

19(Base Project Allocation - $2,303,000)

 

20(13) SR 0218, Resurface, PA 218, West
21Virginia State Line to Emerald Mine
22Road, Waynesburg Borough and Franklin,
23Washington and Wayne Townships,
24Project ID 102387

 

25Project Allocation

4,000,000

26(Base Project Allocation - $4,000,000)

 

27(14) SR 0019, Resurface, US 19 from North
28Street to Gordon Hill Road, Franklin
29and Whiteley Townships, Project ID
3098379

 

1Project Allocation

608,000

2(Base Project Allocation - $608,000)

 

3(15) SR 0221, Rehabilitation and
4Resurface, PA 221 from PA 188 to US
519, Morgan and Washington Townships,
6Project ID 98380

 

7Project Allocation

3,630,000

8(Base Project Allocation - $3,630,000)

 

9(16) SR 0019, Rehabilitation and
10Resurface, US 19 from Tower Road to
11Moore Street, Franklin and Whiteley
12Townships, Project ID 98381

 

13Project Allocation

2,040,000

14(Base Project Allocation - $2,040,000)

 

15(17) SR 0019, Resurface, US 19, Cherry
16Avenue to Fifth Avenue, Waynesburg
17Borough and Franklin, Washington and
18Wayne Townships, Project ID 102387

 

19Project Allocation

1,250,000

20(Base Project Allocation - $1,250,000)

 

21(18) SR 0221, Rehabilitation and
22Resurface, PA 221 from US 19 to the
23Washington County Line, Washington
24Township, Project ID 98403

 

25Project Allocation

3,810,000

26(Base Project Allocation - $3,810,000)

 

27(19) SR 0018, Resurface, PA 18 to the
28Washington County Line, Franklin,
29Morris and Washington Townships,
30Project ID 98406

 

1Project Allocation

1,406,000

2(Base Project Allocation - $1,406,000)

 

3(20) I-79, Reconstruction, I-79 from West
4Virginia State Line to the Washington
5County Line, Various Municipalities,
6Project ID 0

 

7Project Allocation

87,600,000

8(Base Project Allocation -
9$87,600,000)

 

10(21) SR 0018, Rehabilitation and
11Resurface, PA 18 from the West
12Virginia State Line to Center TR 469
13(Grinnage Run), Center, Freeport,
14Gilmore and Jackson Townships, Project
15ID 98407

 

16Project Allocation

9,293,000

17(Base Project Allocation - $9,293,000)

 

18(22) SR 0088, Rehabilitation and
19Resurface, PA 88 from SR 2027 (Colvin
20Road) to PA 21, Cumberland and
21Monongahela Townships, Project ID
2298382

 

23Project Allocation

1,485,000

24(Base Project Allocation - $1,485,000)

 

25(23) SR 0021, Resurface, PA 21 from the
26West Virginia State Line to Bristoria
27Road (SR 3022), Richhill Township,
28Project ID 98878

 

29Project Allocation

570,000

30(Base Project Allocation - $570,000)

 

1(24) SR 2003, Rehabilitation and
2Resurface, SR 2003 from the West
3Virginia State Line to US 19, Franklin
4and Perry Townships, Waynesburg
5Borough, Whitely Township, Project ID
698373

 

7Project Allocation

14,070,000

8(Base Project Allocation -
9$14,070,000)

 

10(25) SR 0088, Rehabilitation and
11Resurface, PA 88 from PA 21 to Ceylon
12Road, Carmichaels Borough and
13Cumberland Township, Project ID 98383

 

14Project Allocation

2,085,000

15(Base Project Allocation - $2,085,000)

 

16(26) SR 2011, Rehabilitation and
17Resurface, SR 2011 from Newtown Block
18Intersection to Block Plant
19Intersection, Dunkard, Greene and
20Monongahela Townships, Project ID
2198375

 

22Project Allocation

7,028,000

23(Base Project Allocation - $7,028,000)

 

24(27) SR 0218, Resurface, PA 218 from
25Bluff Ridge Road to Cook Avenue,
26Franklin Township and Waynesburg
27Borough, Project ID 100284

 

28Project Allocation

5,000,000

29(Base Project Allocation - $5,000,000)

 

30(28) PA 21, Resurface and Reconstruction,

 

1Fox Road to George Street, Cumberland
2Township, Project ID 98372

 

3Project Allocation

240,000

4(Base Project Allocation - $240,000)

 

5(29) SR 2011, Rehabilitation and
6Resurface, SR 2011 from the West
7Virginia State Line to Village of
8Newtown, Dunkard Township, Project ID
998371

 

10Project Allocation

2,130,000

11(Base Project Allocation - $2,130,000)

 

12(30) SR 3013, Rehabilitation and
13Resurface, SR 3013 from Brave to Maple
14Run Road (Tie-In to New Mine Portal),
15Center and Wayne Townships, Project ID
1698460

 

17Project Allocation

14,029,000

18(Base Project Allocation - $7,028,000)

 

19(Design & Contingencies - $7,001,000)

 

20(31) SR 0019, Resurface, US 19 from the
21West Virginia State Line to SR 2006
22(Interstate Detour), Perry Township,
23Project ID 100493

 

24Project Allocation

1,300,000

25(Base Project Allocation - $1,300,000)

 

26Section 331. Huntingdon County.

27Projects are as follows:

 

28(1) (Reserved).

 

29(2) SR 0026, Add Northbound Turn Lane, PA
3026 at 8th Street Intersection,

 

1Huntingdon Borough, Project ID 88218

 

2Project Allocation

200,000

3(Base Project Allocation - $200,000)

 

4(3) SR 0026, Culvert Replacement, PA 26
5over Muddy Run near Intersection of
67th Street, Huntingdon Borough,
7Project ID 92696

 

8Project Allocation

220,000

9(Base Project Allocation - $220,000)

 

10(4) SR 0913, Highway Construction PA 913
11from SR 3001 to SR 3019 Cooks Road,
12Carbon Township, Coalmont, Dudley and
13Top City Boroughs, Wood Township,
14Project ID 92632

 

15Project Allocation

420,000

16(Base Project Allocation - $420,000)

 

17(5) SR 0550, Resurface, PA 550 from the
18Blair County Line to PA 350, Warriors
19Mark Township, Project ID 92615

 

20Project Allocation

380,000

21(Base Project Allocation - $380,000)

 

22(6) SR 0022, Intersection Improvement, US
2322 at Intersection of PA 829,
24Henderson Township, Project ID 88516

 

25Project Allocation

115,000

26(Base Project Allocation - $84,000)

 

27(Land Allocation - $26,000)

 

28(Design & Contingencies - $5,000)

 

29(7) SR 0522, Resurface, US 522 from
30Cromwell Street to Keystone Road (T-

 


1507), Cromwell and Shirley Townships
2and Shirleysburg Borough, Project ID
391657

 

4Project Allocation

440,000

5(Base Project Allocation - $440,000)

 

6(8) SR 4004, Resurface, SR 4004 (Main
7Street) from PA 305 to SR 4014,
8Alexandria Borough, Porter Township,
9Project ID 96344

 

10Project Allocation

267,000

11(Base Project Allocation - $267,000)

 

12(9) SR 4005, Resurface, SR 4005 (Pike
13Street/Alexandra Pike) from PA 26 to
14Porter Township Line, Porter and
15Smithfield Townships, Project ID 96345

 

16Project Allocation

292,000

17(Base Project Allocation - $292,000)

 

18(10) SR 0026, Highway Reconstruction, PA
1926 from SR 1019 East Branch Road to SR
201023 Alan Seegar Road, Jackson and
21Miller Townships, Project ID 91664

 

22Project Allocation

300,000

23(Base Project Allocation - $300,000)

 

24(11) SR 0994, Highway Reconstruction, PA
25994 from Grange Hill Road, T-363 to SR
263019 Cooks Road, Todd Township,
27Project ID 91665

 

28Project Allocation

310,000

29(Base Project Allocation - $310,000)

 

30(12) SR 0994, Resurface, PA 994 from

 

1Cooks Road (SR 3019) to Waterfall Road
2(PA 655), Clay and Todd Townships,
3Project ID 91666

 

4Project Allocation

310,000

5(Base Project Allocation - $310,000)

 

6(13) SR 0035, Resurface, PA 35 from
7Richvale Road (SR 2008) to the Juniata
8County Line, Tell Township, Project ID
991662

 

10Project Allocation

460,000

11(Base Project Allocation - $460,000)

 

12(14) SR 1004, Intersection Improvements,
13PA 26 at Intersection of Saw Mill Road
14(T-528) and Guyer Road (T-533),
15Jackson Township, Project ID 88223

 

16Project Allocation

200,000

17(Base Project Allocation - $200,000)

 

18(15) SR 0655, Resurface, PA 655 from Wall
19Street (T-501) to Front Mountain Road
20(SR 1007), Brady Township, Project ID
2191659

 

22Project Allocation

300,000

23(Base Project Allocation - $300,000)

 

24(16) SR 0022, Highway Restoration, US 22
25from PA 26 Interchange to Westover
26Hill Road (T-450), Smithfield
27Township, Project ID 96567

 

28Project Allocation

1,200,000

29(Base Project Allocation - $1,200,000)

 

30(17) SR 0026, Intersection Improvement,

 

1PA 26 at Summit School Road (T-517)
2Intersection, Miller Township, Project
3ID 88214

 

4Project Allocation

200,000

5(Base Project Allocation - $200,000)

 

6(18) SR 3029, Resurface, SR 3029 (Smith
7Valley Road/Callohill Street) from
8Dirt Mountain Road to PA 655, Cass
9Township, Mapleton Borough, Union
10Township, Project ID 96351

 

11Project Allocation

2,189,000

12(Base Project Allocation - $2,189,000)

 

13(19) SR 3010, Intersection Improvements,
14US 22, Intersection SR 2020, Brady
15Township, Project ID 88231

 

16Project Allocation

200,000

17(Base Project Allocation - $200,000)

 

18(20) SR 0026, Intersection Improvements,
19PA 26, PA 305 Intersection, Jackson
20Township, Project ID 88229

 

21Project Allocation

327,000

22(Base Project Allocation - $200,000)

 

23(Land Allocation - $36,000)

 

24(Design & Contingencies - $91,000)

 

25(21) SR 0022, Intersection Improvements,
26PA 26, 7th Street Intersection,
27Huntingdon Borough, Project ID 88224

 

28Project Allocation

200,000

29(Base Project Allocation - $200,000)

 

30(22) SR 0026, Intersection Improvements,

 

1PA 26, Intersection of Blair Road (T-
2497), Oneida Township, Project ID
388220

 

4Project Allocation

200,000

5(Base Project Allocation - $200,000)

 

6(23) SR 0026, Resurface, PA 26 from the
7Bedford County Line to Aitch Road (SR
83010), Hopewell and Lincoln Townships
9and Marklesburg Borough, Project ID
1091663

 

11Project Allocation

3,400,000

12(Base Project Allocation - $3,400,000)

 

13(24) SR 0022, Resurface, US 22 from
14Shaffersville Road (SR 4016) to End of
154-Lane, Morris and Porter Townships,
16Project ID 91660

 

17Project Allocation

260,000

18(Base Project Allocation - $260,000)

 

19(25) SR 3001, Resurface, Little Valley
20Road (SR 3001) from PA 913 to PA 994,
21Carbon and Todd Townships, Project ID
2296585

 

23Project Allocation

2,000,000

24(Base Project Allocation - $2,000,000)

 

25(26) SR 0994, Resurface, PA 994 from
26Grange Hill Road (T-363) to Cooks Road
27(SR 3019), Todd Township, Project ID
2896576

 

29Project Allocation

700,000

30(Base Project Allocation - $700,000)

 

1(27) SR 1006, Resurface, Chilcoat Hollow
2Road (SR 1006) from PA 305 to Cold
3Springs Road (SR 1009), Logan and
4Oneida Townships, Project ID 96577

 

5Project Allocation

1,800,000

6(Base Project Allocation - $1,800,000)

 

7(28) SR 1009, Resurface, Cold Springs
8Road (SR 1009) from Petersburg Pike
9(SR 4007) to PA 26, Oneida Township,
10Project ID 96578

 

11Project Allocation

1,100,000

12(Base Project Allocation - $1,100,000)

 

13(29) SR 4009, Resurface, Diamond Valley
14Road (SR 4009) from PA 305 to PA 305,
15Logan and West Townships, Project ID
1696594

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(30) SR 0022, Resurface, US 22 from
20Approximately 0.75 Miles West of Old
2122 Road to Bridge over SR 3035, Porter
22and Smithfield Townships, Project ID
2396597

 

24Project Allocation

700,000

25(Base Project Allocation - $700,000)

 

26(31) SR 1029, Resurface, Charter Oak Road
27(SR 1029) from PA 305 to PA 26, Barree
28and West Townships, Project ID 96580

 

29Project Allocation

1,700,000

30(Base Project Allocation - $1,700,000)

 

1(32) SR 2004, Resurface, Meadow Gap Road
2(SR 2004) from PA 994 to PA 475, Clay
3and Springfield Townships, Project ID
496581

 

5Project Allocation

1,200,000

6(Base Project Allocation - $1,200,000)

 

7(33) SR 2010, Resurface, Allison Road (SR
82010) from PA 35 to Tuscarora Creek
9Road (T-409), Tell Township, Project
10ID 96582

 

11Project Allocation

900,000

12(Base Project Allocation - $900,000)

 

13(34) SR 0747, Resurface, PA 747 from
14Chester Furnace Road (SR 2016) to
15Jones Street (T-414), Cromwell and
16Shirley Townships, Mount Union
17Borough, Project ID 96575

 

18Project Allocation

700,000

19(Base Project Allocation - $700,000)

 

20(35) SR 2018, Resurface, Fannettsburg
21Pike (SR 2018) from the Fulton County
22Line to Franklin County Line, Dublin
23Township, Project ID 96584

 

24Project Allocation

575,000

25(Base Project Allocation - $575,000)

 

26(36) SR 0026, Slide Repair, SR 0026,
27Segment 510, Oneida Township, Project
28ID 22954

 

29Project Allocation

285,000

30(Base Project Allocation - $275,000)

 

1(Land Allocation - $10,000)

 

2(37) SR 3010, Resurface, Aitch Road (SR
33010) from PA 26 to Government
4Boundary Road, Marklesburg Borough,
5Project ID 96586

 

6Project Allocation

576,000

7(Base Project Allocation - $576,000)

 

8(38) SR 3011, Resurface, Seven Points
9Road (SR 3011 from Upper Corners Road
10(T-450) to Turkey Farm Road (SR 3037),
11Penn Township, Project ID 96587

 

12Project Allocation

700,000

13(Base Project Allocation - $700,000)

 

14(39) SR 3014, Resurface, Williamsburg
15Mountain Road (SR 3014) from Blair
16County Line to Hartslog Valley Road
17(SR 3039), Porter and Walker
18Townships, Project ID 96588

 

19Project Allocation

1,300,000

20(Base Project Allocation - $1,300,000)

 

21(40) SR 3027, Resurface, Beavertown Road
22(SR 3027) from Sugar Run Road (SR
233025) to PA 829, Cass and Todd
24Townships, Project ID 96590

 

25Project Allocation

1,500,000

26(Base Project Allocation - $1,500,000)

 

27(41) SR 4025, Resurface, Ridge Road (SR
284025) from Pennington Road (PA 550) to
29Half Moon Valley Road (PA 550),
30Warriors Mark Township, Project ID

 

196596

 

2Project Allocation

1,400,000

3(Base Project Allocation - $1,400,000)

 

4(42) SR 4014, Resurface, Main Street (SR
54014) from US 22 to Barree Road (SR
64004) and Barree Road (SR 4004) from
7PA 305 to Main Street (SR 4014),
8Porter Township, Project ID 96595

 

9Project Allocation

210,000

10(Base Project Allocation - $210,000)

 

11(43) SR 3031, Resurface, Little Valley
12Road (SR 3031) from PA 994 to State
13Forest Road, Todd Township, Project ID
1496591

 

15Project Allocation

600,000

16(Base Project Allocation - $600,000)

 

17(44) SR 0030, Intersection Improvements,
18PA 26 at Intersection of Alan Seegar
19Road (SR 1023), Jackson Township,
20Project ID 88227

 

21Project Allocation

200,000

22(Base Project Allocation - $200,000)

 

23(45) SR 3033, Resurface, Piney Ridge Road
24(SR 3033) from Seven Points Road (SR
253011) to Crooked Creek Road (T-564),
26Juniata, Penn, Smithfield and Walker
27Townships, Project ID 96592

 

28Project Allocation

2,500,000

29(Base Project Allocation - $2,500,000)

 

30(46) SR 2017, Resurface, Blacklog Valley

 

1Road (SR 2017) from Black Log Mountain
2Road (SR 2012) to Juniata County Line,
3Shirley Township, Project ID 96583

 

4Project Allocation

825,000

5(Base Project Allocation - $825,000)

 

6(47) SR 0453, Highway Rehabilitation, PA
7453 from the Blair County Line to
8Silver Barn Road (SR 1017), Birmingham
9Borough and Warriors Mark Township,
10Project ID 96573

 

11Project Allocation

3,500,000

12(Base Project Allocation - $3,000,000)

 

13(Land Allocation - $500,000)

 

14(48) SR 0350, Resurface, PA 350 from PA
15550 to the Blair County Line, Warriors
16Mark Township, Project ID 96572

 

17Project Allocation

600,000

18(Base Project Allocation - $600,000)

 

19(49) SR 0305, Resurface, PA 305 from PA
2026 to the Mifflin County Line, Jackson
21Township, Project ID 96571

 

22Project Allocation

2,100,000

23(Base Project Allocation - $2,100,000)

 

24(50) SR 0045, Resurface, PA 45 from PA
25453 to Union Furnace Road (SR 4006),
26Morris and Spruce Creek Townships,
27Project ID 96570

 

28Project Allocation

850,000

29(Base Project Allocation - $850,000)

 

30(51) SR 0035, Resurface, PA 35 from PA

 

1522 to Richvale Road (SR 2008), Dublin
2and Tell Townships, Project ID 96569

 

3Project Allocation

2,300,000

4(Base Project Allocation - $2,300,000)

 

5(52) SR 0026, Resurface, PA 26 from
6Mountain Road (T-420) to US 22,
7Marklesburg Borough and Penn,
8Smithfield and Walker Townships,
9Project ID 96568

 

10Project Allocation

576,000

11(Base Project Allocation - $576,000)

 

12(53) SR 0522, Resurface, PA 522 from
13Enyeart Road (T-365) to Country View
14Lane, Cromwell and Shirley Townships
15and Shirleysburg Borough, Project ID
1696574

 

17Project Allocation

880,000

18(Base Project Allocation - $880,000)

 

19(54) SR 0022, Intersection Improvement,
20US 22 at Penn Street (SR 1010)
21Intersection, Henderson and Smithfield
22Townships, Project ID 98771

 

23Project Allocation

290,000

24(Base Project Allocation - $290,000)

 

25(55) SR 0022, Intersection Improvement,
26US 22 at 4th Street (SR 3047)
27Intersection, Smithfield Township,
28Project ID 98770

 

29Project Allocation

271,000

30(Base Project Allocation - $271,000)

 

1(56) Various, Highway Portion Bridge
2Preservation, Various State Routes,
3Various Municipalities, Project ID
493706

 

5Project Allocation

1,109,000

6(Base Project Allocation - $1,109,000)

 

7Section 332. Indiana County.

8Projects are as follows:

 

9(1) (Reserved).

 

10(2) SR 0403, Resurface, along PA 403 from
11PA 286 to US 119, Cherryhill Township,
12Clymer Borough, East Mahoning and
13Green Townships, Marion Center
14Borough, Rayne Township, Project ID
1591375

 

16Project Allocation

3,180,000

17(Base Project Allocation - $3,180,000)

 

18(3) SR 0210, Resurface, along PA 210 from
19PA 85 Intersection East of Plumville
20to PA 954, East Mahoning, North
21Mahoning and South Mahoning Townships,
22Project ID 91319

 

23Project Allocation

452,000

24(Base Project Allocation - $452,000)

 

25(4) SR 0056, Highway Realignment with
26Existing Structure, PA 56 Segment
270450, Structure over Brush Creek,
28Brush Valley Township, Project ID
2988851

 

30Project Allocation

712,000

1(Base Project Allocation - $712,000)

 

2(5) SR 0422, Concrete Restoration, along
3US 422 Eastbound and Westbound from
4the PA 286 (Oakland Avenue)
5Interchange to the Bridge carrying US
6422 over SR 6422 (Wayne Avenue) and SR
73035 (Old US 119 Highway), White
8Township, Project ID 88615

 

9Project Allocation

3,812,000

10(Base Project Allocation - $3,801,000)

 

11(Design & Contingencies - $11,000)

 

12(6) SR 0286, Highway Reconstruction, SR
130286 from SR 1032 Arcadia Road North
14to the Clearfield County Line, Banks
15and Montgomery Townships, Glen
16Campbell Borough, Project ID 91320

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(7) SR 4005, Resurface, along SR 4005
20(North 4th Street/Old Highway 119
21North) from SR 0286 to SR 0110,
22Indiana Borough, White Township,
23Project ID 91321

 

24Project Allocation

1,000,000

25(Base Project Allocation - $1,000,000)

 

26(8) US 119, Highway Portion Bridge
27Preservation, US 119 Northbound over
28PA 286, White Township, Project ID
2995727

 

30Project Allocation

22,000

1(Design & Contingencies - $22,000)

 

2(9) US 119, Highway Portion Bridge
3Preservation, US 119 Southbound over
4PA 286, White Township, Project ID
595728

 

6Project Allocation

22,000

7(Design & Contingencies - $22,000)

 

8(10) SR 4005, Intersection Improvement,
9Intersection on SR 4005, Segments 0050
10through 0070, Indiana Borough, White
11Township, Project ID 88992

 

12Project Allocation

2,234,000

13(Base Project Allocation - $1,109,000)

 

14(Land Allocation - $1,125,000)

 

15(11) SR 0259, Resurface, along SR 0259
16from the Westmoreland County Line to
17US 422, Brush Valley, Cherryhill and
18West Wheatfield Townships, Project ID
1991374

 

20Project Allocation

4,500,000

21(Base Project Allocation - $4,500,000)

 

22(12) SR 0022, Safety Improvement, Turn
23Lanes, SR 0022 at T-990 (Corporate
24Campus Drive) and SR 0022 at T-445
25Villa Road, Burrell Township, Project
26ID 91314

 

27Project Allocation

310,000

28(Base Project Allocation - $310,000)

 

29(13) SR 0119, Highway Portion Bridge
30Rehabilitation, Existing Structure

 

1carrying US 119 over Two Lick Creek,
2Center Township, Project ID 95852

 

3Project Allocation

464,000

4(Base Project Allocation - $464,000)

 

5(14) SR 0553, Resurface, along PA 553
6from PA 403 to the Cambria County
7Line, Pine Township, Project ID 91376

 

8Project Allocation

940,000

9(Base Project Allocation - $940,000)

 

10(15) SR 0219, Highway Restoration, along
11US 219 from the Cambria County Line to
12the Clearfield County Line, Cherry
13Tree Borough, Project ID 88374

 

14Project Allocation

1,000,000

15(Base Project Allocation - $1,000,000)

 

16(16) SR 0119, Highway Portion Bridge
17Rehabilitation, US 119 over T-840
18(Tide Road), Yellow and Two Lick
19Creeks, Stoney Run and an Abandoned
20Private Railroad, Center Township,
21Project ID 92579

 

22Project Allocation

7,094,000

23(Base Project Allocation - $5,933,000)

 

24(Land Allocation - $284,000)

 

25(Design & Contingencies - $877,000)

 

26(17) SR 0217, Highway Reconstruction, SR
270217 from the Westmoreland County Line
28to SR 0286, Black Lick and Burrell
29Townships, Blairsville Borough,
30Project ID 91318

 

1Project Allocation

452,000

2(Base Project Allocation - $452,000)

 

3(18) SR 4007, Resurface, SR 4007 (Fifth
4Street) from PA 286 to SR 4005 (Fourth
5Street), Indiana Borough, White
6Township, Project ID 97946

 

7Project Allocation

3,300,000

8(Base Project Allocation - $3,300,000)

 

9(19) SR 0286, Safety Improvement, Signal
10Interconnect, SR 0286 from Thirteenth
11Street to Philadelphia-Ninth Street
12Intersections, and Third/Philadelphia
13to Eleventh/Philadelphia Street
14Intersections, Indiana Borough,
15Project ID 91315

 

16Project Allocation

500,000

17(Base Project Allocation - $500,000)

 

18(20) SR 0056, Highway Reconstruction,
19Rehabilitation, SR 0056 from Roundtop
20Road to Buena Vista Bridge, Brush
21Valley Township, Project ID 91313

 

22Project Allocation

840,000

23(Base Project Allocation - $840,000)

 

24(21) SR 0056, Safety Improvement,
25Realignment to Improve Geometry and
26Sight Distance, along PA 56 Near
27United High School Approximately 1.07
28Mile Northwest of the Intersection
29with US 22, East Wheatfield Township,
30Project ID 90194

 

1Project Allocation

798,000

2(Base Project Allocation - $681,000)

 

3(Land Allocation - $43,000)

 

4(Design & Contingencies - $74,000)

 

5(22) SR 0119, Resurface, along SR 0119
6from 1,400 Feet South of T-487 (Park
7Road) to 1,000 Feet North of T-491
8(Craig Road), Rayne Township, Project
9ID 91312

 

10Project Allocation

2,050,000

11(Base Project Allocation - $2,050,000)

 

12(23) SR 0403, Safety Improvement,
13Including Reconfiguring the Existing
14"Y" Intersection to a "T"
15Intersection, Intersection of PA 403
16and PA 553, Pine Township, Project ID
1790195

 

18Project Allocation

444,000

19(Base Project Allocation - $441,000)

 

20(Design & Contingencies - $3,000)

 

21(24) SR 2008, Safety Improvement,
22Landslide Repair, along SR 2008 (Power
23Plant Road) between the Conemaugh
24River and Power Plant Road, East
25Wheatfield Township, Project ID 91311

 

26Project Allocation

628,000

27(Base Project Allocation - $628,000)

 

28(25) SR 0422, Safety Improvement,
29Including the Addition of a Left-Turn
30Lane, Intersection of US 422 and PA

 

1259 near Yellow Creek Park, Cherryhill
2and Pine Townships, Project ID 90196

 

3Project Allocation

343,000

4(Base Project Allocation - $296,000)

 

5(Land Allocation - $11,000)

 

6(Design & Contingencies - $36,000)

 

7(26) SR 0119, Widening, US 119 from East
8Church Street to T-841 Greenville
9Road, Center Township, Homer City
10Borough, Project ID 91256

 

11Project Allocation

500,000

12(Base Project Allocation - $500,000)

 

13(27) SR 0403, Highway Reconstruction, SR
140403, Buffington, Cherryhill, East
15Wheatfield and Pine Townships, Clymer
16Borough, Project ID 91892

 

17Project Allocation

1,200,000

18(Base Project Allocation - $1,200,000)

 

19(28) SR 0422, Highway Portion Bridge
20Replacements, US 422 Eastbound and
21Westbound over PA 954 (South 6th
22Street), White Township, Project ID
2396961

 

24Project Allocation

258,000

25(Base Project Allocation - $213,000)

 

26(Land Allocation - $6,000)

 

27(Design and Contingencies - $39,000)

 

28(29) SR 0954, Highway Reconstruction, SR
290954 from SR 0085 in Plumville North
30to Smicksburg Borough, South Mahoning

 

1and West Mahoning Townships, Plumville
2and Smicksburg Boroughs, Project ID
391317

 

4Project Allocation

400,000

5(Base Project Allocation - $400,000)

 

6(30) SR 0119, Highway Reconstruction, SR
70119, Burrell, Center, East Mahoning,
8North Mahoning, Rayne and White
9Townships, Homer City Borough, Project
10ID 91894

 

11Project Allocation

3,080,000

12(Base Project Allocation - $3,080,000)

 

13(31) SR 0286, Intersection Improvement,
14Conversion of Signalized Intersection
15to a Roundabout, Existing At-Grade
16Intersection of PA 286 and SR 1002
17(East Pike Road), Indiana Borough,
18White Township, Project ID 96353

 

19Project Allocation

951,000

20(Base Project Allocation - $600,000)

 

21(Design and Contingencies - $351,000)

 

22(32) SR 0085, Resurface, along PA 85 from
23the Armstrong County Line to US 119,
24Plumville Borough, Rayne Township,
25South Mahoning and Washington
26Townships, Project ID 91889

 

27Project Allocation

900,000

28(Base Project Allocation - $900,000)

 

29(33) SR 0056, Highway Reconstruction, SR
300056, Armstrong, Brush Valley, Center

 

1and East Wheatfield Townships, Armagh,
2Homer City and Shelocta Boroughs,
3Project ID 91890

 

4Project Allocation

1,680,000

5(Base Project Allocation - $1,680,000)

 

6(34) SR 0422, Highway Reconstruction, SR
70422, Armstrong, Center, Cherryhill,
8Pine and White Townships, Shelocta
9Borough, Project ID 91893

 

10Project Allocation

1,380,000

11(Base Project Allocation - $1,380,000)

 

12(35) SR 0217, Highway Portion Bridge
13Replacement, PA 217 (4 Miles North of
14Blairsville) over Stewart Run, Black
15Lick Township, Project ID 86022

 

16Project Allocation

4,852,000

17(Base Project Allocation - $3,717,000)

 

18(Land Allocation - $177,000)

 

19(Design & Contingencies - $958,000)

 

20(36) SR 0286, Highway Reconstruction, SR
210286 Corridor, Various Municipalities,
22Project ID 91888

 

23Project Allocation

4,820,000

24(Base Project Allocation - $4,820,000)

 

25(37) SR 0022, Safety Improvement, along
26US 22 from the Westmoreland County
27Line to the US 22/US 119 Interchange,
28Blairsville Borough, Burrell Township,
29Project ID 98104

 

30Project Allocation

3,951,000

1(Base Project Allocation - $2,500,000)

 

2(Land Allocation - $950,000)

 

3(Design & Contingencies - $501,000)

 

4(38) SR 0210, Safety Improvement,
5Existing At-Grade Intersection of PA
6210 and SR 4025 (Valier Road), North
7Mahoning Township, Project ID 95908

 

8Project Allocation

314,000

9(Base Project Allocation - $314,000)

 

10(39) SR 0022, Highway Reconstruction, SR
110022, Burrell, East Wheatfield and
12West Wheatfield Townships, Blairsville
13Borough, Project ID 91891

 

14Project Allocation

1,820,000

15(Base Project Allocation - $1,820,000)

 

16(40) SR 0286, Safety Improvement,
17Existing At-Grade Intersection of PA
18286 and SR 3056 (Old Route 56
19Highway), Center Township, Project ID
2095898

 

21Project Allocation

1,441,000

22(Base Project Allocation - $1,321,000)

 

23(Land Allocation - $120,000)

 

24(41) SR 3056, Resurface, along SR 3056
25(Old Route 56 Highway) from Armstrong
26County Line to Lincoln Street,
27Armstrong and Center Townships, Homer
28City Borough, Young Township, Project
29ID 91855

 

30Project Allocation

1,200,000

1(Base Project Allocation - $1,200,000)

 

2(42) SR 0711, Resurface, along PA 711
3from PA 56 to PA 403, East Wheatfield
4Township, Project ID 91854

 

5Project Allocation

950,000

6(Base Project Allocation - $950,000)

 

7(43) SR 2008, Highway Reconstruction, SR
82008 (Power Plant Road), East
9Wheatfield and West Wheatfield
10Townships, Project ID 91852

 

11Project Allocation

350,000

12(Base Project Allocation - $350,000)

 

13(44) SR 0119, Highway Portion Bridge
14Replacement, US 119 Northbound and
15Southbound over PA 110, White
16Township, Project ID 99514

 

17Project Allocation

1,126,000

18(Base Project Allocation - $1,059,000)

 

19(Design & Contingencies - $67,000)

 

20(45) SR 2002, Safety Improvements, SR
212002 (Market Street) at its
22Intersection with Morrow, Spring and
23Stewart Streets, Blairsville Borough,
24Project ID 98113

 

25Project Allocation

1,151,000

26(Base Project Allocation - $1,000,000)

 

27(Design & Contingencies - $151,000)

 

28(46) SR 4032, Safety Improvement,
29Existing Intersection of SR 4032
30(Philadelphia Street) and 11th Street,

 

1Indiana Borough, Project ID 98114

 

2Project Allocation

375,000

3(Base Project Allocation - $300,000)

 

4(Design & Contingencies - $75,000)

 

5(47) SR 0217, Resurface, Route 217 from
6the Conemaugh River to Market Street,
7Burrell Township, Project ID 102371

 

8Project Allocation

500,000

9(Base Project Allocation - $500,000)

 

10(48) SR 0056, Resurface, PA 56 from PA
11954 to SR 2024 (Philadelphia Street),
12Armagh Borough, Brush Valley, Center
13and East Wheatfield Townships, Project
14ID 99254

 

15Project Allocation

800,000

16(Base Project Allocation - $800,000)

 

17(49) SR 4032, Safety Improvement,
18Intersection of SR 4032 (Philadelphia
19Street) and 13th Street, Indiana
20Borough, Project ID 98115

 

21Project Allocation

375,000

22(Base Project Allocation - $300,000)

 

23(Design and Contingencies - $75,000)

 

24(50) SR 0286, Resurface, PA 286 from T-
25890 (Tanoma Road) to Franklin Street,
26Cherryhill Township, Clymer Borough,
27Rayne Township, Project ID 100092

 

28Project Allocation

3,300,000

29(Base Project Allocation - $3,300,000)

 

30(51) SR 4032, Safety Improvement,

 

1Intersection of SR 4032 (West Pike
2Road) and SR 4422 (Ben Franklin Road),
3White Township, Project ID 98116

 

4Project Allocation

375,000

5(Base Project Allocation - $300,000)

 

6(Design and Contingencies - $75,000)

 

7(52) SR 0022, Variable Message Signs,
8Intelligent Transportation System,
9Installation of Six DMS and Four CCTV
10Cameras, along US 22 from the
11Westmoreland County Line East to the
12Cambria County Line, Blairsville
13Borough, Burrell, East Wheatfield and
14West Wheatfield Townships, Project ID
1598106

 

16Project Allocation

1,346,000

17(Base Project Allocation - $1,196,000)

 

18(Design & Contingencies - $150,000)

 

19(53) SR 0286, Safety Improvement, along
20PA 286 at its Intersection with 3rd,
2110th and Church Streets, Indiana
22Borough, White Township, Project ID
2398112

 

24Project Allocation

1,426,000

25(Base Project Allocation - $1,150,000)

 

26(Design & Contingencies - $276,000)

 

27Section 333. Jefferson County.

28Projects are as follows:

 

29(1) (Reserved).

 

30(2) SR 0028, Highway Reconstruction, SR

 

10028, Clover, Pine Creek, Rose, Snyder
2and Warsaw Townships, Brockway,
3Brookville and Summerville Boroughs,
4Project ID 91902

 

5Project Allocation

2,520,000

6(Base Project Allocation - $2,520,000)

 

7(3) SR 0036, Intersection Improvement,
8Existing At-Grade Intersection of PA
936 and SR 0436, Punxsutawney Borough,
10Project ID 95896

 

11Project Allocation

234,000

12(Base Project Allocation - $234,000)

 

13(4) SR 0028, Intersection
14Reconfiguration, Existing At-Grade
15Intersection of PA 28 and US 322, Pine
16Creek Township, Project ID 26064

 

17Project Allocation

503,000

18(Base Project Allocation - $387,000)

 

19(Land Allocation - $37,000)

 

20(Design & Contingencies - $79,000)

 

21(5) I-80, Highway Reconstruction with
22Bridge Preservation, I-80 Segments
230884 through 0961, Washington
24Township, Project ID 91896

 

25Project Allocation

2,605,000

26(Base Project Allocation - $2,500,000)

 

27(Design & Contingencies - $105,000)

 

28(6) SR 0322, Highway Reconstruction, SR
290322, Pine Creek, Rose, Union and
30Winslow Townships, Brookville, Corsica

 

1and Reynoldsville Boroughs, Project ID
291904

 

3Project Allocation

2,430,000

4(Base Project Allocation - $2,430,000)

 

5(7) SR 2025, Resurface, along SR 2025
6from SR 2023 to SR 0322, Knox and Pine
7Creek Townships, Project ID 91380

 

8Project Allocation

900,000

9(Base Project Allocation - $900,000)

 

10(8) I-80, Highway Reconstruction, I-80
11from the Jefferson County Line to PA
1228, Pine Creek, Rose and Union
13Townships, Brookville Borough, Project
14ID 91901

 

15Project Allocation

6,770,000

16(Base Project Allocation - $6,500,000)

 

17(Land Allocation - $50,000)

 

18(Design & Contingencies - $220,000)

 

19(9) SR 0219, Highway Reconstruction, SR
200219, Snyder and Washington Townships,
21Brockway Borough, Project ID 91900

 

22Project Allocation

910,000

23(Base Project Allocation - $910,000)

 

24(10) SR 0436, Highway Reconstruction, SR
250436, Young Township, Punxsutawney
26Borough, Project ID 91899

 

27Project Allocation

1,000,000

28(Base Project Allocation - $1,000,000)

 

29(11) SR 0036, Highway Reconstruction, SR
300036, Barnett, Bell, Eldred, Gaskill,

 

1Oliver, Perry, Rose and Young
2Townships, Brookville and Punxsutawney
3Boroughs, Project ID 91898

 

4Project Allocation

3,580,000

5(Base Project Allocation - $3,580,000)

 

6(12) I-80, Highway Reconstruction, I-80
7SR 4005 to SR 1830, Pine Creek and
8Washington Townships, Project ID 91905

 

9Project Allocation

6,790,000

10(Base Project Allocation - $6,500,000)

 

11(Land Allocation - $50,000)

 

12(Design & Contingencies - $240,000)

 

13(13) SR 0310, Resurface, along PA 310
14from Punxsutawney Borough to
15Reynoldsville Borough, McCalmont
16Township, Punxsutawney and
17Reynoldsville Boroughs, Winslow and
18Young Townships, Project ID 91390

 

19Project Allocation

2,700,000

20(Base Project Allocation - $2,700,000)

 

21(14) SR 0949, Rehabilitation, SR 0949
22from US 322 (Main Street) to PA 36,
23Corsica Borough, Eldred and Union
24Townships, Project ID 95593

 

25Project Allocation

2,800,000

26(Base Project Allocation - $2,800,000)

 

27(15) SR 0830, Intersection Improvements,
28Existing At-Grade Intersection of SR
290830 (Washington Avenue/Main Street)
30and SR 0950 (Third Street), Falls

 

1Creek Borough, Project ID 95546

 

2Project Allocation

2,515,000

3(Base Project Allocation - $1,500,000)

 

4(Land Allocation - $475,000)

 

5(Design & Contingencies - $540,000)

 

6(16) SR 0949, Resurface, along PA 949
7from SR 0036 to the Elk County Line,
8Eldred, Heath and Polk Townships,
9Project ID 91392

 

10Project Allocation

600,000

11(Base Project Allocation - $600,000)

 

12(17) SR 0536, Highway Reconstruction, SR
130536, Oliver, Perry, Ringgold and
14Young Townships, Project ID 91856

 

15Project Allocation

1,000,000

16(Base Project Allocation - $1,000,000)

 

17(18) SR 2023, Resurface, along SR 2023
18from PA 310 to SR 2025, Knox and
19McCalmont Townships, Project ID 91378

 

20Project Allocation

400,000

21(Base Project Allocation - $400,000)

 

22(19) SR 1830, Resurface, along SR 1830
23from SR 8008 to PA 830, Pine Creek,
24Warsaw and Washington Townships,
25Project ID 91391

 

26Project Allocation

320,000

27(Base Project Allocation - $320,000)

 

28(20) SR 0949, Resurface, along PA 949
29from US 322 to PA 36, Corsica Borough,
30Eldred and Union Townships, Project ID

 

191377

 

2Project Allocation

395,000

3(Base Project Allocation - $395,000)

 

4(21) SR 0028, Safety Improvement, Roadway
5Realignment, along PA 28 from the
6Clarion County Line to SR 3007
7(Carrier Street), Clover Township,
8Summerville Borough, Project ID 91389

 

9Project Allocation

620,000

10(Base Project Allocation - $620,000)

 

11(22) SR 0119, Safety Improvements, SR
120119 (Ridge Avenue) at SR 0310 (Elk
13Run Avenue), Punxsutawney Borough,
14Project ID 91387

 

15Project Allocation

350,000

16(Base Project Allocation - $350,000)

 

17(23) SR 0949, Resurface, along PA 949
18from PA 28 to US 322, Clover Township,
19Corsica Borough, Union Township,
20Project ID 91386

 

21Project Allocation

600,000

22(Base Project Allocation - $600,000)

 

23(24) SR 3007, Resurface, along SR 3007
24(Heathville Ohl Road) from SR 3005
25(Pansy Ringgold Road) to SR 0028,
26Beaver, Clover and Rose Townships,
27Summerville Borough, Project ID 91379

 

28Project Allocation

1,000,000

29(Base Project Allocation - $1,000,000)

 

30(25) SR 0119, Highway Reconstruction, SR

 

10119 Bell, Henderson, Winslow and
2Young Townships, Big Run, Punxsutawney
3and Sykesville Boroughs, Project ID
491897

 

5Project Allocation

1,800,000

6(Base Project Allocation - $1,800,000)

 

7(26) SR 0830, Resurface, along SR 0830
8from the Intersection with SR 1830
9(Allens Mills Road) to the Clearfield
10County Line, Falls Creek Borough,
11Washington Township, Project ID 92620

 

12Project Allocation

240,000

13(Base Project Allocation - $240,000)

 

14(27) SR 0036, Construct, Design, Build
15ADA-Compliant Curb Ramps, along US 119
16from Mahoning Street to Jenks Avenue
17and along SR 0036 from SR 0436 to US
18119, Punxsutawney Borough, Project ID
1988949

 

20Project Allocation

393,000

21(Base Project Allocation - $393,000)

 

22(28) SR 0119, Resurface, US 119 from
23Caroline Street to Clearfield County
24Line, Big Run Borough, Henderson
25Township, Sykesville Borough, Winslow
26Township, Project ID 99656

 

27Project Allocation

3,300,000

28(Base Project Allocation - $3,300,000)

 

29(29) I-80, Reconstruction, I-80 from the
30Clarion County Line to the Clearfield

 

1County Line, Various Municipalities,
2Project ID 0

 

3Project Allocation

94,800,000

4(Base Project Allocation -
5$94,800,000)

 

6(30) SR 3008, Relocation/Realignment,
7along SR 3008 (Perry Street) from New
8York Avenue to PA 36 Associated with
9the Margiotti Bridge Replacement
10Project, Punxsutawney Borough, Project
11ID 101119

 

12Project Allocation

500,000

13(Base Project Allocation - $500,000)

 

14(31) SR 3033, Resurface, SR 3033 (Mabon
15Street) from T-830 (Belgiumtown Road)
16to US 322, Brookville Borough, Project
17ID 99904

 

18Project Allocation

900,000

19(Base Project Allocation - $900,000)

 

20(32) SR 0036, Resurface, Route 36 from SR
214004 to North of SR 0949, and
22Including Paving 500 Feet of the
23Approaches of the Intersection with PA
2428 and PA 322, Eldred Township,
25Project ID 102368

 

26Project Allocation

3,200,000

27(Base Project Allocation - $3,200,000)

 

28(33) SR 0322, Resurface, along US 322
29from SR 0036 to 0.31 Mile Northwest of
30T-520 (Hatten Road), Brookville

 

1Borough, Pine Creek Township, Project
2ID 100240

 

3Project Allocation

2,600,000

4(Base Project Allocation - $2,600,000)

 

5(34) SR 1008, Highway Portion Bridge
6Replacement over Rattlesnake Creek,
7Existing Structure carrying SR 1008
8(Rattlesnake Road) over Rattlesnake
9Creek, Snyder Township, Project ID
10101117

 

11Project Allocation

2,303,000

12(Base Project Allocation - $1,601,000)

 

13(Land Allocation - $50,000)

 

14(Design & Contingencies - $652,000)

 

15(35) SR 0036, Resurface, PA 36 from SR
162001 (Winslow Road) to US 119, Bell
17and Gaskill Townships, Punxsutawney
18Borough, Project ID 99270

 

19Project Allocation

1,740,000

20(Base Project Allocation - $1,740,000)

 

21Section 334. Juniata County.

22Projects are as follows:

 

23(1) (Reserved).

 

24(2) SR 0075, Highway Portion Bridge
25Replacement, SR 0075 over Eshs Run,
26BMS 34-0075-0480-1660, Spruce Hill
27Township, Project ID 91515

 

28Project Allocation

2,261,000

29(Base Project Allocation - $1,326,000)

 

30(Land Allocation - $176,000)

 

1(Design & Contingencies - $759,000)

 

2(3) SR 2007, Highway Portion Bridge
3Replacement, SR 2007 over Lost Creek,
4BMS 34-2007-0140-0000, Fayette
5Township, Project ID 91518

 

6Project Allocation

1,391,000

7(Base Project Allocation - $674,000)

 

8(Land Allocation - $135,000)

 

9(Design & Contingencies - $582,000)

 

10(4) SR 0022, Highway Restoration, SR 0022
11Tributary of Juniata River to
12Thompsontown, Walker and Delaware
13Townships, Thompsontown Borough,
14Project ID 88331

 

15Project Allocation

600,000

16(Base Project Allocation - $600,000)

 

17(5) SR 0022/0322, Park and Ride Lot, US
1822/322 Corridor, Fermanagh Township,
19Project ID 82994

 

20Project Allocation

560,000

21(Base Project Allocation - $420,000)

 

22(Land Allocation - $40,000)

 

23(Design & Contingencies - $100,000)

 

24(6) SR 0150, Highway Restoration, SR
250022, Tributary of Juniata River to
26Thompsontown, Walker and Delaware
27Townships, Thompsontown Borough,
28Project ID 88334

 

29Project Allocation

650,000

30(Base Project Allocation - $650,000)

 

1(7) SR 0120, Highway Restoration, SR 0022
2Port Royal to Crossover, Walker
3Township, Project ID 88330

 

4Project Allocation

300,000

5(Base Project Allocation - $300,000)

 

6(8) SR 0075, Resurface, SR 0075, Honey
7Grove to Spruce Hill, Segments
80310/0000 to 0510/0000, Spruce Hill
9and Tuscarora Townships, Project ID
1096273

 

11Project Allocation

1,000,000

12(Base Project Allocation - $1,000,000)

 

13(9) SR 0022, Highway Resurfacing, SR 0022
14Segments/Offset 0290/0000 to 420/0000,
15Delaware Township, Thompsontown
16Borough, Walker Township, Project ID
1793305

 

18Project Allocation

1,000,000

19(Base Project Allocation - $1,000,000)

 

20(10) SR 3011, Highway Portion Bridge
21Replacement, SR 3011 over Licking
22Creek, Segment 0030, Offset 0986 near
23Mifflin and Milford Townships, Project
24ID 91520

 

25Project Allocation

1,177,000

26(Base Project Allocation - $871,000)

 

27(Land Allocation - $66,000)

 

28(Design & Contingencies - $240,000)

 

29(11) SR 0022, Highway Restoration, SR
300022, Mifflintown to County Line,

 

1Eastbound Segments 0290/0102 to
20420/0973, Westbound Segments
30341/0000 to 0421/1674, Delaware
4Township, Thompsontown Borough, Walker
5Township, Project ID 91065

 

6Project Allocation

394,000

7(Design & Contingencies - $394,000)

 

8(12) SR 0035, Highway Rehabilitation
9Associated with Bridge Replacement, SR
100035 over Tributary of Doyle Run, Near
11Nook, Beale, Spruce Hill and Tuscarora
12Townships, Project ID 93955

 

13Project Allocation

903,000

14(Base Project Allocation - $488,000)

 

15(Land Allocation - $66,000)

 

16(Design & Contingencies - $349,000)

 

17(13) SR 0235, Highway Portion Bridge
18Replacement, SR 0235 over Cranes Run,
19Segment 0110/0000 near Seven Stars,
20Greenwood Township, Project ID 93942

 

21Project Allocation

701,000

22(Base Project Allocation - $701,000)

 

23(14) SR 0035, Highway Portion Bridge
24Replacement, SR 0035 over Tributary of
25Lost Creek, BMS 34-0035-0720-0000,
26Fayette Township, Project ID 88195

 

27Project Allocation

1,956,000

28(Base Project Allocation - $1,229,000)

 

29(Land Allocation - $137,000)

 

30(Design & Contingencies - $590,000)

 

1(15) SR 2006, Highway Portion Bridge
2Replacement, SR 2006 over Doe Run, BMS
334-2006-0150-1696, Walker Township,
4Project ID 81508

 

5Project Allocation

1,359,000

6(Base Project Allocation - $653,000)

 

7(Land Allocation - $133,000)

 

8(Design & Contingencies - $573,000)

 

9(16) SR 0035, Highway Portion Bridge
10Replacement, SR 0035 over Tributary of
11Cocolamus Creek, BMS 34-0035-0800-
120000, Fayette and Monroe Townships,
13Project ID 88175

 

14Project Allocation

1,129,000

15(Base Project Allocation - $722,000)

 

16(Land Allocation - $91,000)

 

17(Design & Contingencies - $316,000)

 

18(17) SR 3074, Safety Improvements, SR
190075 Corridor, Turbett and Milford
20Townships, Port Royal Borough, Walker
21Township, Project ID 88252

 

22Project Allocation

400,000

23(Base Project Allocation - $100,000)

 

24(Land Allocation - $100,000)

 

25(Design & Contingencies - $200,000)

 

26(18) SR 0075, Highway Portion Bridge
27Preservation, PA 75 over US 22, BMS
2834-0075-0730-2017, Fermanagh and
29Walker Townships, Project ID 97529

 

30Project Allocation

508,000

1(Base Project Allocation - $508,000

 

2(19) SR 4002, Safety Improvements, SR
34002, Segments 0090/0469 to 0100/0064,
4Milford Township, Project ID 91934

 

5Project Allocation

300,000

6(Base Project Allocation - $200,000)

 

7(Design & Contingencies - $100,000)

 

8(20) SR 0074, Betterment, Restoration, PA
974, Turbett Township, Project ID
10101900

 

11Project Allocation

2,747,000

12(Base Project Allocation - $2,596,000)

 

13(Design & Contingencies - $151,000)

 

14(21) SR 0075, Betterment, Restoration, PA
1575, Lack, Spruce Hill, Turbett and
16Tuscarora Townships, Project ID 101901

 

17Project Allocation

8,261,000

18(Base Project Allocation - $8,111,000)

 

19(Design & Contingencies - $150,000)

 

20(22) SR 0035, Betterment, Restoration, PA
2135 Fayette and Fermanagh Townships,
22Mifflin and Mifflintown Boroughs,
23Milford Township, Project ID 101898

 

24Project Allocation

4,360,000

25(Base Project Allocation - $4,210,000)

 

26(Design & Contingencies - $150,000)

 

27(23) SR 0035, Resurface, SR 0035,
28Huntingdon County Line to Tuscarora
29Township, Segments 0010/0000 to
300180/2206, Lack and Tuscarora

 

1Townships, Project ID 100373

 

2Project Allocation

5,700,000

3(Base Project Allocation - $5,700,000)

 

4(24) SR 0333, Resurface, SR 0333, PA 35
5to Van Dyke Road, Segment 0150/0000 to
60290/1977, Milford Township, Port
7Royal Borough, Turbett Township,
8Project ID 100365

 

9Project Allocation

1,600,000

10(Base Project Allocation - $1,600,000)

 

11(25) SR 0104, Betterment, Restoration, PA
12104, Susquehanna Township, Project ID
13101902

 

14Project Allocation

926,000

15(Base Project Allocation - $776,000)

 

16(Design & Contingencies - $150,000)

 

17(26) SR 0035, Resurface, PA 35,
18McAlisterville to SR 1005, Fayette
19Township, Project ID 99995

 

20Project Allocation

400,000

21(Base Project Allocation - $400,000)

 

22(27) SR 0235, Resurface, SR 0235,
23Greenwood Township to Tributary of
24Delaware Creek, Segments 0090/0000 to
250320/0000, Delaware and Greenwood
26Townships, Project ID 100362

 

27Project Allocation

3,866,000

28(Base Project Allocation - $3,866,000)

 

29(28) SR 0035, Resurface, SR 0035, Smith
30Road to Snyder County Line, Segments

 

10760/0000 to 0940/2856, Fayette and
2Monroe Townships, Project ID 100370

 

3Project Allocation

5,500,000

4(Base Project Allocation - $5,500,000)

 

5(29) SR 0333, Resurface, PA 333, Mifflin
6County Line to Varnes Road, Mifflin
7Borough, Milford Township, Project ID
899996

 

9Project Allocation

3,447,000

10(Base Project Allocation - $3,447,000)

 

11(30) SR 0035, Resurface, PA 35, Cross
12Road to PA 333, Segments 0400/0000 to
130510/0000, Beale and Milford
14Townships, Project ID 100296

 

15Project Allocation

2,500,000

16(Base Project Allocation - $2,500,000)

 

17(31) SR 4001, Betterment, Restoration, SR
184000 Quad Routes, Beale, Fermanagh and
19Lack Townships, Mifflin Borough,
20Milford and Tuscarora Townships,
21Project ID 101980

 

22Project Allocation

11,475,000

23(Base Project Allocation -
24$11,325,000)

 

25(Design & Contingencies - $150,000)

 

26(32) SR 3002, Betterment, Restoration, SR
273000 Quad Routes, Various, Project ID
28101977

 

29Project Allocation

41,031,000

30(Base Project Allocation -

 

1$40,880,000)

 

2(Design & Contingencies - $151,000))

 

3(33) SR 2001, Betterment, Restoration, SR
42000 Quad Routes, Various, Project ID
5101976

 

6Project Allocation

42,705,000

7(Base Project Allocation -
8$42,555,000)

 

9(Design & Contingencies - $150,000)

 

10(34) SR 1001, Betterment, Restoration, SR
111000 Quad Routes, Fayette, Fermanagh
12and Monroe Townships, Project ID
13101975

 

14Project Allocation

5,595,000

15(Base Project Allocation - $5,445,000)

 

16(Design & Contingencies - $150,000)

 

17(35) SR 0035, Resurface, PA 35 from
18McKinley Road to Cross Road, Beale and
19Tuscarora Townships, Project ID 100000

 

20Project Allocation

2,347,000

21(Base Project Allocation - $2,347,000)

 

22(36) SR 0035, Resurface, PA 35, SR 4006
23to McKinley Road, Lack and Tuscarora
24Townships, Project ID 99993

 

25Project Allocation

1,334,000

26(Base Project Allocation - $1,334,000)

 

27(37) SR 0333, Resurface, PA 333, Main
28Street, Delaware Township,
29Thompsontown Borough, Turbett and
30Walker Townships, Project ID 99998

 

1Project Allocation

3,300,000

2(Base Project Allocation - $3,300,000)

 

3(38) SR 0235, Betterment, Restoration, PA
4235, Delaware and Fayette Townships,
5Project ID 101903

 

6Project Allocation

3,766,000

7(Base Project Allocation - $3,616,000)

 

8(Design & Contingencies - $150,000)

 

9(39) SR 0022, Betterment, Restoration, US
1022/322, Delaware and Fermanagh
11Townships, Project ID 101907

 

12Project Allocation

5,181,000

13(Base Project Allocation - $5,030,000)

 

14(Design & Contingencies - $151,000)

 

15(40) SR 0011, Betterment, Restoration, US
1611/15, Susquehanna Township, Project
17ID 101906

 

18Project Allocation

1,291,000

19(Base Project Allocation - $1,140,000)

 

20(Design & Contingencies - $151,000)

 

21(41) SR 0333, Betterment, Restoration, PA
22333, Delaware Township, Project ID
23101904

 

24Project Allocation

1,525,000

25(Base Project Allocation - $1,375,000)

 

26(Design & Contingencies - $150,000)

 

27(42) SR 0333, Resurface, PA 333,
28Thompsontown Interchange, Delaware
29Township, Thompsontown Borough,
30Project ID 99999

 

1Project Allocation

1,665,000

2(Base Project Allocation - $1,665,000)

 

3(43) SR 0850, Betterment, Restoration, PA
4850, Tuscarora Township, Project ID
5101905

 

6Project Allocation

3,206,000

7(Base Project Allocation - $3,055,000)

 

8(Design & Contingencies - $151,000)

 

9(44) SR 3002, Resurface, SR 3002, Arch
10Rock Road to Main Street, Fermanagh
11Township, Project ID 99994

 

12Project Allocation

1,000,000

13(Base Project Allocation - $1,000,000)

 

14(45) SR 0235, Resurface, SR 0235, Perry
15County to Greenwood Township, Segments
160010/0000 to 0090/0000, Greenwood and
17Susquehanna Townships, Project ID
18100358

 

19Project Allocation

1,354,000

20(Base Project Allocation - $1,354,000)

 

21(46) SR 2003, Highway Portion Bridge
22Replacement, SR 2003 over Doe Run,
23Walker Township, Project ID 101634

 

24Project Allocation

752,000

25(Base Project Allocation - $501,000)

 

26(Land Allocation - $58,000)

 

27(Design & Contingencies - $193,000)

 

28(47) SR 0035, Resurface, PA 35,
29Mifflintown Interchange, Segments
300560/0000 to 0600/0000, Fermanagh

 

1Township, Project ID 100339

 

2Project Allocation

1,144,000

3(Base Project Allocation - $1,144,000)

 

4(48) Various Highway Restoration, Various
5Segments of Juniata County, SR 0035,
6SR 0074, SR 0075, SR 1001, SR 3002,
7Mifflin County, SR 0103, SR 0305,
8Various Municipalities in Juniata and
9Mifflin Counties, Project ID 91033

 

10Project Allocation

3,101,000

11(Base Project Allocation - $3,101,000)

 

12(49) Various, Highway Portion Bridge
13Preservation, Various State Routes,
14Beale, Turbett and Tuscarora
15Townships, Project ID 94970

 

16Project Allocation

270,000

17(Base Project Allocation - $270,000)

 

18(50) Various Highway Portion Bridge
19Preservation Activities, SR 0035 over
20Willow Run, SR 0075 over Tributary of
21Tuscarora Creek (2 Bridges) and SR
220850 over Tuscarora Creek, Lack and
23Tuscarora Townships, Project ID 69400

 

24Project Allocation

533,000

25(Base Project Allocation - $533,000)

 

26Section 335. Lackawanna County.

27Projects are as follows:

 

28(1) SR 0084, Highway Portion Bridge
29Preservation, I-84 (Fallen Trooper
30Memorial Highway), Roaring Brook

 

1Township, Project ID 97918

 

2Project Allocation

162,000

3(Base Project Allocation - $95,000)

 

4(Design & Contingencies - $67,000)

 

5(2) SR 0307, Park and Ride Lot, SR 0307
6at Interchange with I-380, Covington
7Township, Project ID 97839

 

8Project Allocation

4,167,000

9(Base Project Allocation - $4,167,000)

 

10(3) SR 0084, Rehabilitation, Segments
110084/0014 through 0084/0185, Various,
12Project ID 85791

 

13Project Allocation

178,876,000

14(Base Project Allocation -
15$178,876,000)

 

16(4) SR 0348, Safety Improvements, Turning
17Lanes, Improve Sight Distance, SR 0348
18from SR 2002 (Wimmers Road) to SR 2003
19(Cortez Road), Jefferson Township,
20Project ID 94567

 

21Project Allocation

514,000

22(Base Project Allocation - $280,000)

 

23(Land Allocation - $180,000)

 

24(Design & Contingencies - $54,000)

 

25(5) SR 0081, Reconstruction, I-81, Moosic
26Borough, City of Scranton, Project ID
2787736

 

28Project Allocation

26,832,000

29(Base Project Allocation -
30$24,675,000)

 

1(Land Allocation - $55,000)

 

2(Design & Contingencies - $2,102,000)

 

3(6) SR 0006, Restoration, Surface
4Treatment, SR 0006, Moosic Borough,
5Project ID 91210

 

6Project Allocation

1,001,000

7(Base Project Allocation - $1,000,000)

 

8(Design & Contingencies - $1,000)

 

9(7) I-80, I-81, I-84, SR 2042, Install
10ITS Devices, Various Sites along I-80,
11I-81, I-84, SR 2042, Various
12Municipalities in Lackawanna and
13Luzerne Counties, Project ID 91404

 

14Project Allocation

633,000

15(Base Project Allocation - $600,000)

 

16(Design & Contingencies - $33,000)

 

17(8) SR 0380, Restoration, SR 0380 in the
18Corresponding Municipalities, Clifton
19and Covington Townships, Project ID
2087791

 

21Project Allocation

700,000

22(Base Project Allocation - $600,000)

 

23(Design & Contingencies - $100,000)

 

24(9) I-84, Reconstruction, I-84, Elmhurst
25Township to Mount Cobb, Dunmore
26Borough, Elmhurst, Jefferson and
27Roaring Brook Townships, Project ID
2894637

 

29Project Allocation

10,155,000

30(Base Project Allocation - $9,535,000)

 

1(Design & Contingencies - $620,000)

 

2(10) SR 0081, SR 0084, Resurface, I-84,
3Pike County and SR 0081 from Scranton
4Line to SR 0632, Various
5Municipalities in Lackawanna and Pike
6Counties, Project ID 96309

 

7Project Allocation

3,383,000

8(Base Project Allocation - $3,382,000

 

9(Design & Contingencies - $1,000)

 

10(11) SR 0081, Surface Treatment, I-81
11from the Luzerne County Line to North
12of the Central Scranton Expressway,
13Moosic Borough, City of Scranton,
14Project ID 96104

 

15Project Allocation

501,000

16(Base Project Allocation - $500,000)

 

17(Design & Contingencies - $1,000)

 

18(12) SR 0011, Highway Portion Bridge
19Preservation, US 11 (Pittston Avenue)
20over Railroad, Moosic Borough, Project
21ID 95454

 

22Project Allocation

3,061,000

23(Base Project Allocation - $3,060,000)

 

24(Design & Contingencies - $1,000)

 

25(13) SR 0006, Rehabilitation, Resurface,
26SR 0006 Corridors and Adjacent Roads,
27La Plume Township, Project ID 95435

 

28Project Allocation

1,000,000

29(Base Project Allocation - $1,000,000)

 

30(14) I-81, Safety Improvement, I-81 Exit

 

1186 Northbound Off Ramp at SR 2020
2(Drinker Street), Dunmore and Moosic
3Boroughs, Project ID 95263

 

4Project Allocation

283,000

5(Base Project Allocation - $173,000)

 

6(Land Allocation - $90,000)

 

7(Design & Contingencies - $20,000)

 

8(15) SR 0081, Reconstruction, I-81 North
9and South from Scranton Expressway
10Exit to Olyphant Avenue, I-84 East and
11West from Elmhurst Exit (#2) to
12Interchange with I-81, Dunmore
13Borough, City of Scranton, Project ID
1492435

 

15Project Allocation

2,853,000

16(Base Project Allocation - $2,570,000)

 

17(Design & Contingencies - $250,000)

 

18(16) SR 0307, Safety Improvements,
19Reconstruction Shoulders, Rumble
20Strips and Line Painting, SR 0307
21(Morgan Highway), Beginning 1000 Feet
22North from Intersection with Keyser
23Avenue to the Lahey Fun Park, City of
24Scranton, South Abington Township,
25Project ID 89922

 

26Project Allocation

105,000

27(Base Project Allocation - $105,000)

 

28(17) I-80, Restoration, I-80 in the
29Corresponding Municipalities, Benton,
30Greenfield and Scott Townships,

 

1Project ID 87789

 

2Project Allocation

7,850,000

3(Base Project Allocation - $7,400,000)

 

4(Design & Contingencies - $450,000)

 

5(18) I-81, Restoration, Pavement
6Reconstruction, I-81 in the
7Corresponding Municipalities, Scott
8Township, City of Scranton, South
9Abington Township, Project ID 91545

 

10Project Allocation

9,010,000

11(Base Project Allocation - $8,500,000)

 

12(Land Allocation - $10,000)

 

13(Design & Contingencies - $500,000)

 

14(19) SR 4019, Highway Portion Bridge
15Replacement, SR 4019 (Edella Road)
16over I-81, South Abington Township,
17Project ID 96720

 

18Project Allocation

2,700,000

19(Base Project Allocation - $2,510,000)

 

20(Land Allocation - $23,000)

 

21(Design & Contingencies - $167,000)

 

22(20) SR 0347, Safety Improvement, SR 0347
23from University Drive to Greenridge
24Street, Dunmore Borough, Project ID
258394

 

26Project Allocation

1,579,000

27(Base Project Allocation - $1,579,000)

 

28(21) SR 3013, Intersection Improvements,
29Main Street/Main Avenue Corridor,
30School Street to Kennedy Drive, City

 

1of Scranton, Project ID 69535

 

2Project Allocation

180,000

3(Base Project Allocation - $120,000)

 

4(Design & Contingencies - $60,000)

 

5(22) I-81, Restoration, Microsurfacing,
6I-81 in the Corresponding
7Municipalities, City of Scranton,
8South Abington Township, Project ID
991541

 

10Project Allocation

250,000

11(Base Project Allocation - $220,000)

 

12(Design & Contingencies - $30,000)

 

13(23) I-81, Restoration, Mill and
14Resurface, I-81 in the Corresponding
15Municipalities, Benton, Greenfield and
16Scott Townships, Project ID 91542

 

17Project Allocation

336,000

18(Base Project Allocation - $336,000)

 

19(24) I-84, Highway Restoration, I-81 from
20North of SR 0435 to I-84 and I-84 from
21I-81 to Pike County Line, Various
22Municipalities in Lackawanna and Wayne
23Counties, Project ID 91540

 

24Project Allocation

545,000

25(Base Project Allocation - $520,000)

 

26(Design & Contingencies - $25,000)

 

27(25) SR 8002, Park and Ride Lot, SR 8002,
28Segment 0051 Tigue Street, Dunmore
29Borough, Project ID 92949

 

30Project Allocation

2,180,000

1(Base Project Allocation - $1,700,000)

 

2(Land Allocation - $240,000)

 

3(Design & Contingencies - $240,000)

 

4(26) I-81, Restoration, Concrete
5Grinding, Resurface, I-81 in the
6Corresponding Municipalities, Dunmore
7Borough, City of Scranton, Project ID
891548

 

9Project Allocation

2,762,000

10(Base Project Allocation - $2,312,000)

 

11(Design & Contingencies - $450,000)

 

12(27) I-84, Restoration, Resurface, I-84
13Eastbound from Exit 2 to Exit 8, I-84
14Exit Ramps, SR 0380 Interchange,
15Dunmore Borough, Elmhurst, Jefferson
16and Roaring Brook Townships, Project
17ID 91538

 

18Project Allocation

7,320,000

19(Base Project Allocation - $7,300,000)

 

20(Design & Contingencies - $20,000)

 

21(28) SR 4019, Highway Portion Bridge
22Replacement, SR 4019 (Edella Road)
23over I-81, South Abington Township,
24Project ID 96689

 

25Project Allocation

403,000

26(Design & Contingencies - $403,000)

 

27(29) SR 1017, Slope Repair, SR 1017
28(Chapman Lake Road), Scott Township,
29Project ID 96793

 

30Project Allocation

446,000

1(Base Project Allocation - $331,000)

 

2(Design & Contingencies - $115,000)

 

3(30) SR 0380, Restoration, I-380
4Northbound and Southbound Clifton and
5Covington Townships, Moscow Borough,
6Roaring Brook Township, Project ID
791556

 

8Project Allocation

7,300,000

9(Base Project Allocation - $6,800,000)

 

10(Design & Contingencies - $500,000)

 

11(31) SR 0107, SR 3025, Restoration,
12Surface Treatment, PA 107 from the
13Wyoming County Line to Bonnie Drive
14and SR 3025 from US 11 to SR 6011,
15Benton, Carbondale and Greenfield
16Townships, Jermyn and Mayfield
17Boroughs, Scott Township, City of
18Scranton, Project ID 102090

 

19Project Allocation

6,304,000

20(Base Project Allocation - $6,303,000)

 

21(Design & Contingencies - $1,000)

 

22(32) SR 1003, Restoration, Surface
23Treatment, SR 1003 from SR 6006
24(Roosevelt Highway) to SR 0171 (Main
25Street), Carbondale, Fell and Madison
26Townships, Moscow Borough, Springbrook
27Township, Vandling Borough, Project ID
28102092

 

29Project Allocation

6,282,000

30(Base Project Allocation - $6,281,000)

 

1(Design & Contingencies - $1,000)

 

2(33) I-81, Reconstruction, I-81 from the
3Luzerne County Line to the Susquehanna
4County Line, Various Municipalities,
5Project ID 0

 

6Project Allocation

106,600,000

7(Base Project Allocation -
8$106,600,000)

 

9(34) SR 0106, Various, Restoration,
10Surface Treatment, SR 1012, SR 1014,
11SR 4030, SR 1023, SR 3029, SR 3013, SR
121015, SR 0106, SR 1008 and SR 4004 in
13the Corresponding Municipalities,
14Archbald Borough, Benton Township,
15Clarks Green Borough, Greenfield
16Township, Jermyn, Jessup, Mayfield and
17Old Forge Boroughs, City of Scranton,
18South Abington Township, Taylor
19Borough, Project ID 102096

 

20Project Allocation

6,480,000

21(Base Project Allocation - $6,479,000)

 

22(Design & Contingencies - $1,000)

 

23(35) I-84, Reconstruction, I-84 from its
24Western Terminus with I-80 to the
25Wayne County Line, Various
26Municipalities, Project ID 0

 

27Project Allocation

51,600,000

28(Base Project Allocation -
29$51,600,000)

 

30(36) SR 1004, Various, Restoration,

 

1Surface Treatment, SR 1004, SR 0347,
2SR 1023 in the Corresponding
3Municipalities, Archbald and Blakely
4Boroughs, City of Carbondale,
5Carbondale Township, Dickson City and
6Dunmore Boroughs, Greenfield Township,
7Olyphant Borough, Scott Township,
8Throop Borough, Project ID 102094

 

9Project Allocation

6,767,000

10(Base Project Allocation - $6,766,000)

 

11(Design & Contingencies - $1,000)

 

12(37) SR 1006, Restoration, Surface
13Treatment, SR 1006, SR 2008 and SR
143023 in the Corresponding
15Municipalities, Carbondale Township,
16Olyphant Borough, Scott Township, City
17of Scranton, Throop Borough, Project
18ID 102072

 

19Project Allocation

5,871,000

20(Base Project Allocation - $5,870,000)

 

21(Design & Contingencies - $1,000)

 

22(38) I-380, Reconstruction, I-380 from
23the Wayne County Line to its Western
24Terminus at I-81, Various
25Municipalities, Project ID 0

 

26Project Allocation

43,400,000

27(Base Project Allocation -
28$43,400,000)

 

29(39) SR 0011, Restoration, Surface
30Treatment, SR 0011 from SR 3031 (Rocky

 

1Glen Road) to Mifflin Avenue and SR
20247 from TR 402 to the Park and Ride
3Entrance, Jefferson Township, Jessup,
4Moosic and Olyphant Boroughs, City of
5Scranton, Project ID 102067

 

6Project Allocation

5,977,000

7(Base Project Allocation - $5,976,000)

 

8(Design & Contingencies - $1,000)

 

9(40) SR 0011, SR 0632, Restoration,
10Surface Treatment, SR 0632 from SR
114018 (Abington Road) to SR 0247
12(Wildcat Road) and SR 0011 from
13Mifflin Avenue to SR 0006 (Northern
14Boulevard), Dalton Borough, Scott
15Township, City of Scranton, South
16Abington and Waverly Townships,
17Project ID 100540

 

18Project Allocation

6,311,000

19(Base Project Allocation - $6,310,000)

 

20(Design & Contingencies - $1,000)

 

21(41) SR 0590, Various, Restoration, SR
220590, SR 3021, SR 4034, SR 0690 in the
23Corresponding Municipalities,
24Elmhurst, Jefferson and Madison
25Townships, Moosic and Moscow Boroughs,
26Newton and Roaring Brook Townships,
27City of Scranton, South Abington and
28Springbrook Townships, Project ID
29102012

 

30Project Allocation

6,165,000

1(Base Project Allocation - $6,164,000)

 

2(Design & Contingencies - $1,000)

 

3(42) SR 1012, Restoration, Surface
4Treatment, SR 1012 (Salem Road), SR
51027 (Layton Road) and SR 2004, in the
6Corresponding Municipalities, Archbald
7Borough, Jefferson, Madison, Scott and
8South Abington Townships, Project ID
9102004

 

10Project Allocation

6,898,000

11(Base Project Allocation - $6,897,000)

 

12(Design & Contingencies - $1,000)

 

13(43) SR 0438, Various, Restoration,
14Surface Treatment, SR 3014, SR 0524,
15SR 3020, SR 3016, SR 6011, SR 3033, SR
163018, SR 0438 in the Corresponding
17Municipalities, Benton and La Plume
18Townships, Moosic Borough, North
19Abington and Scott Townships, City of
20Scranton, Taylor Borough, Project ID
21101999

 

22Project Allocation

6,784,000

23(Base Project Allocation - $6,783,000)

 

24(Design & Contingencies - $1,000)

 

25(44) SR 6006, Various, Restoration,
26Surface Treatment, SR 6006, SR 0011
27and SR 1005 in the Corresponding
28Municipalities, Archbald and Blakely
29Boroughs, Carbondale Township, Dickson
30City and Moosic Boroughs, City of

 

1Scranton, Project ID 102061

 

2Project Allocation

5,926,000

3(Base Project Allocation - $5,925,000)

 

4(Design & Contingencies - $1,000)

 

5(45) SR 1013, SR 1015, Restoration,
6Surface Treatment, SR 1015 (Creamery
7Road) from SR 4003 (Jordon Hollow
8Road) to the Susquehanna County Line
9and SR 1013 from SR 0438 (Boyarsky
10Road) to the Susquehanna County Line,
11Benton, Greenfield and Scott
12Townships, Project ID 101984

 

13Project Allocation

6,010,000

14(Base Project Allocation - $6,009,000)

 

15(Design & Contingencies - $1,000)

 

16(46) SR 2005, Restoration, Surface
17Treatment, SR 2005 and SR 2009, in the
18Corresponding Municipalities,
19Covington, Jefferson and Madison
20Townships, Moscow Borough, Project ID
21101922

 

22Project Allocation

5,497,000

23(Base Project Allocation - $5,496,000)

 

24(Design & Contingencies - $1,000)

 

25(47) SR 0380, Safety Improvement, Various
26Locations on I-380, I-81 and SR 0348,
27Covington Township, Moscow Borough,
28Roaring Brook Township, Project ID
29101978

 

30Project Allocation

3,853,000

1(Base Project Allocation - $3,853,000)

 

2(48) SR 0502, SR 0307, Restoration,
3Surface Treatment, SR 0502 from SR
40011 to SR 0435 (Drinker Pike) and SR
50307 (Scranton-Pocono Highway) from SR
60435 (Drinker Parkway) to the
7Springbrook Township Line, Covington
8Township, Dunmore and Moosic Boroughs,
9Roaring Brook Township, City of
10Scranton, Springbrook Township,
11Project ID 102114

`

12Project Allocation

5,856,000

13(Base Project Allocation - $5,855,000)

 

14(Design & Contingencies - $1,000)

 

15(49) SR 3013, Resurface, Davis Street to
16Rockledge Terrace Drive, Taylor
17Borough, Project ID 102354

 

18Project Allocation

580,000

19(Base Project Allocation - $580,000)

 

20(50) SR 0632, Rehabilitation, Resurface,
21SR 0632, Segment 10, Dalton Borough,
22Project ID 102327

 

23Project Allocation

1,000,000

24(Base Project Allocation - $1,000,000)

 

25(51) SR 0006, Surface Treatment, Various
26Segments on SR 0006, SR 0247, and SR
276011, Various Municipalities, Project
28ID 99517

 

29Project Allocation

7,897,000

30(Base Project Allocation - $7,896,000)

 

1(Design & Contingencies - $1,000)

 

2(52) SR 0438, Various, Restoration,
3Surface Treatment, SR 1016, SR 1001,
4SR 4005, SR 4009, SR 0438, in the
5Corresponding Municipalities, Benton
6and Fell Townships, Jessup Borough, La
7Plume, North Abington Townships,
8Olyphant and Vandling Boroughs,
9Project ID 102117

 

10Project Allocation

5,331,000

11(Base Project Allocation - $5,330,000)

 

12(Design & Contingencies - $1,000)

 

13(53) Various State Routes, Restoration,
14SR 1012, SR 1014, SR 4030, SR 1023, SR
153029, SR 3013, SR 1015, SR 0106, SR
161008, SR 4004 in Corresponding
17Municipalities, Archbald Borough,
18Benton Township, Clarks Green Borough,
19Greenfield Township, Jermyn Borough,
20Jessup Borough, Mayfield Borough, Old
21Forge Borough, City of Scranton, South
22Abington Township, Taylor Borough,
23Project ID 102096

 

24Project Allocation

6,480,000

25(Base Project Allocation - $6,480,000)

 

26(54) Various, Highway Portion Bridge
27Preservation, Various State Routes,
28Various Municipalities in Lackawanna
29and Luzerne Counties, Project ID 93741

 

30Project Allocation

2,569,000

1(Base Project Allocation - $2,258,000)

 

2(Design & Contingencies - $1,000)

 

3(55) Various, Restoration, Surface
4Treatment, SR 3013 from SR 3016 to
5Pierce Street, SR 4026 from SR 0307 to
6SR 0407, SR 0307 from SR 6307 to I-
7476, SR 3011 from SR 3013 to SR 0307,
8SR 6307 from SR 6011 to SR 0307,
9Clarks Green and Clarks Summit
10Boroughs, City of Scranton, Taylor
11Borough, Project ID 91209

 

12Project Allocation

5,173,000

13(Base Project Allocation - $5,172,000)

 

14(Design & Contingencies - $1,000)

 

15(56) Various Interstates, Durable
16Pavement Markings, Various Interstate
17Routes, Various Municipalities in
18Lackawanna, Luzerne, Pike and
19Susquehanna Counties, Project ID 89005

 

20Project Allocation

120,000

21(Base Project Allocation - $120,000)

 

22(57) Various Rehabilitation, Resurface,
23SR 0011, SR 3010, SR 3012, SR 3015, SR
243017, SR 3019, SR 3024 Corridors,
25Moosic and Old Forge Boroughs, City of
26Scranton, Taylor Borough, Project ID
2797220

 

28Project Allocation

500,000

29(Base Project Allocation - $500,000)

 

30Section 336. Lancaster County.

1Projects are as follows:

 

2(1) (Reserved).

 

3(2) SR 0772, Resurface (1" Overlay), PA
4772 (Newport Road/Glenbrook Road) from
5Greenwood Avenue to PA 23 (New Holland
6Pike), Upper Leacock and West Earl
7Townships, Project ID 95222

 

8Project Allocation

1,571,000

9(Base Project Allocation - $1,461,000)

 

10(Land Allocation - $10,000)

 

11(Design & Contingencies - $100,000)

 

12(3) SR 1040, Resurface, SR 1040 (Colonel
13Howard Boulevard) from PA 272 to
14Lesher Road, East Cocalico Township,
15Project ID 96214

 

16Project Allocation

143,000

17(Base Project Allocation - $143,000)

 

18(4) SR 0322, Resurface, US 322 from
19Academy Drive to Hinkletown Bridge,
20Earl, Ephrata and West Earl Townships,
21Ephrata Borough, Project ID 95211

 

22Project Allocation

2,877,000

23(Base Project Allocation - $2,826,000)

 

24(Land Allocation - $11,000)

 

25(Design & Contingencies - $40,000)

 

26(5) SR 0743, Resurface, PA 743 from SR
270441 (River Road) to SR 0230 (South
28Market Street), East Donegal Township,
29Elizabethtown Borough, West Donegal
30Township, Project ID 96210

 

1Project Allocation

608,000

2(Base Project Allocation - $608,000)

 

3(6) SR 0501, Resurface, PA 501 from PA
4722 (Oregon Road) to Lititz Borough
5Line, Lititz Borough, Manheim and
6Warwick Townships, Project 96211

 

7Project Allocation

558,000

8(Base Project Allocation - $533,000)

 

9(Design & Contingencies - $25,000)

 

10(7) SR 0072, Resurface, PA 72 from the
11Lancaster City Line to PA 283
12Interchange, City of Lancaster,
13Manheim Township, Project ID 96212

 

14Project Allocation

500,000

15(Base Project Allocation - $500,000)

 

16(8) SR 0322, Safety Improvements, US 322
17from Ridge Avenue to US 222 Ramps,
18Ephrata Borough, Ephrata and West Earl
19Townships, Project ID 90491

 

20Project Allocation

367,000

21(Base Project Allocation - $280,000)

 

22(Land Allocation - $46,000)

 

23(Design & Contingencies - $41,000)

 

24(9) SR 0772, Highway Portion Bridge
25Replacement, PA 772 (Anderson Ferry
26Road/Marietta Avenue/Mount Joy Avenue)
27over Donegal Creek, East Donegal
28Township, Project ID 87703

 

29Project Allocation

2,855,000

30(Base Project Allocation - $2,855,000)

 

1(10) SR 3017, Widen to Three Lanes,
2Shoulder and Intersection
3Improvements, SR 3017 (Stony Battery
4Road) from Donnerville Road to US 30,
5Mountville Borough, West Hempfield
6Township, Project ID 65131

 

7Project Allocation

336,000

8(Land Allocation - $60,000)

 

9(Design & Contingencies - $276,000)

 

10(11) SR 4057, Highway Reconstruction,
11Segment 4057/0010, East Hempfield
12Township, Project ID 64767

 

13Project Allocation

61,000,000

14(Base Project Allocation -
15$41,000,000)

 

16(Land Allocation - $3,750,000)

 

17(Design & Contingencies - $16,250,000)

 

18(12) SR 0272, Construct Two Lane
19Roundabout, PA 272 from Bylerland Road
20to East Miller Road, Providence
21Township, Project ID 90490

 

22Project Allocation

684,000

23(Base Project Allocation - $663,000)

 

24(Design & Contingencies - $21,000)

 

25(13) SR 0625, Resurface (1" Overlay), PA
26625 (Reading Road) from Berks County
27Line to PA 23 (Main Street) Brecknock,
28Caernarvon and East Earl Townships,
29Project ID 91205

 

30Project Allocation

3,711,000

1(Base Project Allocation - $3,601,000)

 

2(Land Allocation - $10,000)

 

3(Design & Contingencies - $100,000)

 

4(14) SR 0324, Resurface, PA 324 (New
5Danville Pike) from PA 741
6(Millersville Road) to US 222 (Queen
7Street), City of Lancaster, Lancaster
8and Pequea Townships, Project ID 91204

 

9Project Allocation

269,000

10(Base Project Allocation - $157,000)

 

11(Land Allocation - $11,000)

 

12(Design & Contingencies - $101,000)

 

13Project Allocation

 

14(15) SR 0041, Resurface, PA 41 (Newport
15Road) from US 30 (Lincoln Highway) to
16Chester County Line, Sadsbury and
17Salisbury Townships, Project 96216

 

18Project Allocation

1,400,000

19(Base Project Allocation - $1,400,000)

 

20(16) SR 4033, Highway Portion Bridge
21Replacement, SR 4033 (Meadow View
22Road) over Little Chickies Creek,
23Mount Joy and Rapho Townships, Project
24ID 20149

 

25Project Allocation

5,712,000

26(Base Project Allocation - $5,495,000)

 

27(Land Allocation - $20,000)

 

28(Design & Contingencies - $197,000)

 

29(17) SR 0272, Resurface, PA 272
30(Nottingham Road) from US 222 to SR

 

12003 (Little Britain Road), Fulton and
2Little Britain Townships, Project ID
395209

 

4Project Allocation

294,000

5(Base Project Allocation - $184,000)

 

6(Land Allocation - $10,000)

 

7(Design & Contingencies - $100,000)

 

8(18) SR 0230, Highway Portion Bridge
9Replacement, PA 230 (Harrisburg
10Pike/West Main Street) over Tributary
11of Donegal Creek, Mount Joy Township,
12Project ID 90855

 

13Project Allocation

931,000

14(Base Project Allocation - $931,000)

 

15(19) SR 0023, Intersection Improvements
16and Shoulder Widening, Spot Locations
17PA 23 (New Holland Pike/Main Street)
18from US 30 (Lincoln Highway) to US 322
19(28th Division Highway), Earl, East
20Earl, East Lampeter and Manheim
21Townships, New Holland Borough, Upper
22Leacock and West Earl Townships,
23Project ID 91109

 

24Project Allocation

16,000,000

25(Base Project Allocation -
26$16,000,000)

 

27(20) SR 0030, Rehabilitation, Resurface,
28US 30 (Lincoln Highway) from East of
29PA 23 to US 222 Interchange, East
30Hempfield Township, City of Lancaster,

 

1Manheim Township, Project ID 96334

 

2Project Allocation

4,747,000

3(Base Project Allocation - $4,520,000)

 

4(Land Allocation - $26,000)

 

5(Design & Contingencies - $201,000)

 

6(21) SR 0222, Resurface, US 222 (Willow
7Street Pike) from PA 741 (Long Lane)
8to Conestoga River, West Lampeter
9Township, Project ID 96322

 

10Project Allocation

348,000

11(Base Project Allocation - $323,000)

 

12(Design & Contingencies - $25,000)

 

13(22) SR 0300, Diamond Grinding, SR 0300
14(PA 283) from PA 230 (Old Harrisburg
15Pike) to SR 4011 (Fruitville Pike),
16East Hempfield, Manheim and Rapho
17Townships, Project ID 91041

 

18Project Allocation

856,000

19(Base Project Allocation - $756,000)

 

20(Design & Contingencies - $100,000)

 

21(23) SR 0501, Resurface, PA 501 (Furnace
22Hill Pike) from Lititz Borough Line to
23SR 4008 (Brubaker Valley Road),
24Elizabeth and Warwick Townships,
25Project ID 96320

 

26Project Allocation

359,000

27(Base Project Allocation - $333,000)

 

28(Design & Contingencies - $26,000)

 

29(24) SR 0072, Resurface, PA 72 (Manheim
30Pike) from Edgemont Drive to Lebanon

 

1County Line, East Hempfield Township,
2East Petersburg Borough, Manheim
3Borough, Penn and Rapho Townships
4Project ID 91195

 

5Project Allocation

5,500,000

6(Base Project Allocation - $5,500,000)

 

7(25) SR 0030, Intersection Improvements,
8US 30 at SR 2045 Ronks Road, East
9Lampeter Township, Project ID 89187

 

10Project Allocation

190,000

11(Base Project Allocation - $115,000)

 

12(Land Allocation - $31,000)

 

13(Design & Contingencies - $44,000)

 

14(26) SR 1051, Highway Portion Bridge
15Preservation, SR 1051 over Stony Run
16Creek, East Cocalico Township, Project
17ID 94765

 

18Project Allocation

200,000

19(Base Project Allocation - $200,000)

 

20(27) SR 0030, Resurface, US 30 from York
21County Line to East of PA 23 (Marietta
22Avenue), Columbia Borough, East
23Hempfield Township, Mountville
24Borough, West Hempfield Township,
25Project ID 97015

 

26Project Allocation

9,570,000

27(Base Project Allocation - $9,570,000)

 

28(28) SR 4020, Safety/Intersection
29Improvements, Add Adaptive Signals to
3014 Intersections, Intersection of SR

 

14020 (Harrisburg Pike), SR 4009
2(Dillerville Road) and North President
3Avenue, East Hempfield Township, City
4of Lancaster, Manheim and Rapho
5Townships, Project ID 89654

 

6Project Allocation

533,000

7(Base Project Allocation - $533,000)

 

8(29) SR 1019, Highway Reconstruction
9Various Segments of SR 1019, SR 1024,
10SR 2002, SR 2018, SR 2035, SR 3022, SR
113036, SR 4008, SR 4022, Various
12Municipalities, Project ID 90215

 

13Project Allocation

2,000,000

14(Base Project Allocation - $2,000,000)

 

15(30) SR 0272, Rehabilitation, Resurface,
16PA 272 (Oregon Pike) from PA 772
17(Newport Road) to Grandview Drive,
18Akron and Ephrata Boroughs, Ephrata
19and West Earl Townships, Project ID
2090908

 

21Project Allocation

7,000,000

22(Base Project Allocation - $7,000,000)

 

23(31) SR 1040, Intersection Improvement,
24Possible Diverging Diamond, SR 1040
25(Colonel Howard Boulevard) from PA 272
26(Reading Road) to Lasher Road, East
27Cocalico Township, Project ID 97251

 

28Project Allocation

1,600,000

29(Base Project Allocation - $1,600,000)

 

30(32) SR 0030, Intersection and Safety

 

1Improvements, US 30 (Lincoln Highway)
2from PA 896 (Hartman Bridge Road) to
3PA 772 (Newport Road), East Lampeter,
4Leacock, Paradise and Salisbury
5Townships, Project ID 97250

 

6Project Allocation

2,000,000

7(Base Project Allocation - $2,000,000)

 

8(33) SR 0501, Highway Portion Bridge
9Rehabilitation, PA 501 (Furnace Hills
10Pike) over Hammer Creek, Elizabeth
11Township, Project ID 89271

 

12Project Allocation

2,940,000

13(Base Project Allocation - $2,318,00)

 

14(Land Allocation - $161,000)

 

15(Design & Contingencies - $461,000)

 

16(34) SR 0030, Traffic System Management,
17US 30, SR 283, US 222 Corridors,
18Various Municipalities, Project ID
1990221

 

20Project Allocation

7,680,000

21(Base Project Allocation - $7,680,000)

 

22(35) SR 0222, Roadway Reconstruction and
23Bridge Rehabilitation, US 222 from US
2430 (Lincoln Highway) to North of PA
25772 (Newport Road) Interchange,
26Manheim, Warwick and West Earl
27Townships, Project ID 97013

 

28Project Allocation

137,582,000

29(Base Project Allocation -
30$134,455,000)

 

1(Design & Contingencies - $3,127,000)

 

2(36) SR 0462, Resurface, PA 462 (King
3Street) from Lancaster City Line to SR
41002 (Orange Street), City of
5Lancaster, Lancaster and Manheim
6Townships, Project ID 97253

 

7Project Allocation

1,000,000

8(Base Project Allocation - $1,000,000)

 

9(37) SR 0322, Intersection Improvements,
10US 322 (28th Division Highway) from
11Ridge Avenue to Hahnstown Road,
12Ephrata Borough, Ephrata and West Earl
13Townships, Project ID 97256

 

14Project Allocation

400,000

15(Base Project Allocation - $400,000)

 

16(38) SR 0896, Resurface, PA 896
17(Eastbrook Road/Hartman Bridge Road)
18from PA 340 (Old Philadelphia Pike) to
19US 30 (Lincoln Highway, East Lampeter
20Township, Project ID 91060

 

21Project Allocation

1,430,000

22(Base Project Allocation - $1,430,000)

 

23(39) SR 0501, Relocate Oregon Pike
24Approach, Update Left Turn Lane Phases
25at Existing Intersection, PA 501
26(Lititz Pike) and US 222/PA 272
27(Oregon Pike) Intersection, Manheim
28Township, Project ID 89198

 

29Project Allocation

431,000

30(Base Project Allocation - $420,000)

 

1(Design & Contingencies - $11,000)

 

2(40) SR 3030, Resurface, SR 3030 (Water
3Street/River Road) from PA 999 (Penn
4Street) to SR 3032 (Letort Road),
5Manor Township, Project ID 91066

 

6Project Allocation

1,364,000

7(Base Project Allocation - $1,364,000)

 

8(41) SR 0896, Additional Turn Lanes for
9Westbound and Southbound Approaches at
10896/Rockvale, Signalize Intersection
11at 896/Rockvale, US 30/PA 896
12Intersection and PA 896/Rockvale Road
13Intersection, East Lampeter Township,
14Project ID 89185

 

15Project Allocation

334,000

16(Base Project Allocation - $307,000)

 

17(Design & Contingencies - $27,000)

 

18(42) SR 0462, Intersection Improvements,
19PA 462 Intersection with PA 741, East
20Hempfield and Manor Townships, Project
21ID 94910

 

22Project Allocation

652,000

23(Base Project Allocation - $652,000)

 

24(43) SR 0023, Intersection Improvements,
25PA 23 (Marietta Avenue) from Good
26Drive to PA 741, East Hempfield
27Township, Project ID 94912

 

28Project Allocation

618,000

29(Base Project Allocation - $618,000)

 

30(44) SR 0222, Highway Portion Bridge

 

1Preservation, US 222 over T-676 (North
2Church Street), West Earl
3Township, Project ID 94926

 

4Project Allocation

407,000

5(Base Project Allocation - $217,000)

 

6(Land Allocation - $190,000)

 

7(Design & Contingencies - $190,000)

 

8(45) SR 0023, Milling and Resurfacing, PA
923 (New Holland Pike) from Hellers
10Church Road to Kinzer Avenue, Earl
11Township, New Holland Borough, Upper
12Leacock Township, Project ID 94927

 

13Project Allocation

797,000

14(Base Project Allocation - $725,000)

 

15(Land Allocation - $21,000)

 

16(Design & Contingencies - $51,000)

 

17(46) SR 4020, Resurface, SR 4020
18(Harrisburg Pike) from Esbenshade Road
19at SR 0230 to SR 0722, East Hempfield,
20Rapho and West Hempfield Townships,
21Project ID 89001

 

22Project Allocation

2,201,000

23(Base Project Allocation - $2,201,000)

 

24(47) SR 0300, Diamond Grinding, SR 0300
25(PA 283) from Dauphin County Line to
26SR 4008 (East High Street),
27Elizabethtown Borough, Mount Joy
28Township, Project ID 91030

 

29Project Allocation

1,650,000

30(Base Project Allocation - $1,650,000)

 

1(48) SR 0272, Highway Portion Bridge
2Replacement, PA 272 (Reading Road)
3over Muddy Creek, Adamstown Borough,
4Project ID 97263

 

5Project Allocation

200,000

6(Base Project Allocation - $200,000)

 

7(49) SR 0462, Resurface, PA 462 (Lincoln
8Way) from Greenfield Road to Exit Ramp
9from US 30 Eastbound, East Lampeter
10and Manheim Townships, Project ID
1195191

 

12Project Allocation

200,000

13(Base Project Allocation - $178,000)

 

14(Land Allocation - $11,000)

 

15(Design & Contingencies - $11,000)

 

16(50) SR 0030, Diamond Grinding, US 30
17from PA 741 (Rohrerstown Road) to SR
182043 (Oak View Road), East Hempfield,
19East Lampeter and Manheim Townships,
20City of Lancaster, Project ID 91037

 

21Project Allocation

992,000

22(Base Project Allocation - $881,000)

 

23(Design & Contingencies - $111,000)

 

24(51) SR 0501, Resurface, PA 501 (Lititz
25Pike) from SR 4042 (Chester Road) to
26PA 722 (Oregon Road), Manheim
27Township, Project ID 95192

 

28Project Allocation

310,000

29(Base Project Allocation - $198,000)

 

30(Land Allocation - $11,000)

 

1(Design & Contingencies - $101,000)

 

2(52) SR 0772, Resurface, PA 772 (Anderson
3Ferry Road/Marietta Avenue) from SR
44015 (Union School Road), East Donegal
5Township, Mount Joy Borough, Project
6ID 95194

 

7Project Allocation

214,000

8(Base Project Allocation - $153,000)

 

9(Land Allocation - $11,000)

 

10(Design & Contingencies - $50,000)

 

11(53) SR 1001, Resurface, SR 1001
12(Greenfield Road) from SR 8026 (Ramp
13to/from US 30 Eastbound) to SR 3028
14(Hempstead Road), East Lampeter
15Township, City of Lancaster, Project
16ID 95195

 

17Project Allocation

71,000

18(Base Project Allocation - $51,000)

 

19(Land Allocation - $10,000)

 

20(Design & Contingencies - $10,000)

 

21(54) SR 0023, Spot Intersection
22Improvements on PA 23, PA 23
23Intersection with Landis Valley Road,
24PA 23 from Hellers Church Road to
25Quarry Road, PA 23 from Groffdale Road
26to Shirk Road, Earl, East Lampeter and
27Manheim Townships, New Holland
28Borough, Upper Leacock and West Earl
29Townships, Project ID 89207

 

30Project Allocation

1,220,000

1(Base Project Allocation - $1,220,000)

 

2(55) SR 0030, Highway Portion Bridge
3Replacement, US 30 over Houston Run,
4Salisbury Township, Project ID 87500

 

5Project Allocation

222,000

6(Base Project Allocation - $222,000)

 

7(56) SR 2020, Highway Portion Bridge
8Replacement, SR 2020 (Stony Hill Road)
9over Bowey Run, Eden Township, Project
10ID 87518

 

11Project Allocation

291,000

12(Base Project Allocation - $291,000)

 

13(57) US 30, SR 4020, Interchange
14Improvements, US 30 and SR 4020
15(Harrisburg Pike) Interchange, Manheim
16Township, Project ID 80930

 

17Project Allocation

4,000,000

18(Base Project Allocation - $4,000,000)

 

19(58) SR 1047, Highway Portion Bridge
20Replacement, SR 1047 (Cocalico Road)
21over Cocalico Creek, West Cocalico
22Township, Project ID 87379

 

23Project Allocation

237,000

24(Base Project Allocation - $164,000)

 

25(Design & Contingencies - $73,000)

 

26(59) SR 0462, Highway Portion Bridge
27Replacement, PA 462 (Columbia Avenue)
28over Little Conestoga Creek, Lancaster
29and Manor Townships, Project ID 87505

 

30Project Allocation

587,000

1(Base Project Allocation - $587,000)

 

2(60) SR 3038, Highway Portion Bridge
3Replacement, SR 3038 (Bridge Valley
4Road) over Branch of Pequea Creek,
5Martic Township, Project ID 91338

 

6Project Allocation

700,000

7(Base Project Allocation - $700,000)

 

8(61) SR 1040, Resurface, SR 1040 Colonel
9Howard Boulevard from PA 272 to West
10of Lesher Road, East Cocalico
11Township, Project ID 86470

 

12Project Allocation

926,000

13(Base Project Allocation - $901,000)

 

14(Design & Contingencies - $25,000)

 

15(62) SR 0222, Resurface, US 222 North
16(Lime Street) from SR 1012 (Liberty
17Street) to US 222 (Church Street),
18City of Lancaster, Project ID 97273

 

19Project Allocation

500,000

20(Base Project Allocation - $500,000)

 

21(63) SR 1053, Highway Portion Bridge
22Replacement, SR 1053 (Poplar
23Street/Greenville Road) over Cocalico
24Creek, West Cocalico Township, Project
25ID 87515

 

26Project Allocation

372,000

27(Base Project Allocation - $372,000)

 

28(64) SR 0897, Highway Portion Bridge
29Preservation, SR 0897 over US 222,
30Brecknock Township, Project ID 80999

 

1Project Allocation

1,669,000

2(Base Project Allocation - $1,525,000)

 

3(Design & Contingencies - $144,000)

 

4(65) SR 2002, Highway Portion Bridge
5Replacement, SR 2002 (Kirks Mill Road)
6over Reynolds Run, Little Britain
7Township, Project ID 91324

 

8Project Allocation

1,200,000

9(Base Project Allocation - $1,200,000)

 

10(66) SR 2014, Highway Portion Bridge
11Replacement, SR 2014 (Maple Shade
12Road) over Coopers Run, Colerain
13Township, Project ID 91326

 

14Project Allocation

701,000

15(Base Project Allocation - $701,000)

 

16(67) SR 2031, Highway Portion Bridge
17Replacement, SR 2031 (Walnut Run Road)
18over Walnut Run, Strasburg Township,
19Project ID 87550

 

20Project Allocation

141,000

21(Base Project Allocation - $141,000)

 

22(68) SR 2029, Remove Oververtical, Widen
23for Turn Lanes, Drainage,
24Signalization, SR 2029 Strasburg Pike,
25SR 2034 Windy Hill Road, Millstream
26Road Intersection, East Lampeter and
27West Lampeter Townships, Project ID
2882327

 

29Project Allocation

328,000

30(Base Project Allocation - $216,000)

 

1(Land Allocation - $21,000)

 

2(Design & Contingencies - $91,000)

 

3(69) SR 0897, Resurface, PA 897 from Gap
4to PA 340, Salisbury Township, Project
5ID 82476

 

6Project Allocation

1,960,000

7(Base Project Allocation - $1,928,000)

 

8(Land Allocation - $6,000)

 

9(Design & Contingencies - $26,000)

 

10(70) SR 4020, Widen, Resurface and Add
11Signals, Harrisburg Pike (SR 4020)
12Corridor, Manheim Township, Project ID
1380931

 

14Project Allocation

25,301,000

15(Base Project Allocation -
16$25,001,000)

 

17(Design & Contingencies - $300,000)

 

18(71) SR 0340, Highway Portion Bridge
19Replacement, PA 340 (Old Philadelphia
20Pike) over Pequea Creek, Salisbury
21Township, Project ID 87536

 

22Project Allocation

546,000

23(Base Project Allocation - $362,000)

 

24(Design & Contingencies - $184,000)

 

25(72) SR 1010, Highway Portion Bridge
26Replacement, SR 1010 (East Main
27Street) over Storm Channel, West Earl
28Township, Project ID 87541

 

29Project Allocation

129,000

30(Base Project Allocation - $129,000)

 

1(73) SR 0222, Highway Portion Bridge
2Replacement, PA 222 (Beaver Valley
3Pike) over Beaver Creek, Providence
4and Strasburg Townships, Project ID
587547

 

6Project Allocation

354,000

7(Base Project Allocation - $256,000)

 

8(Land Allocation - $17,000)

 

9(Design & Contingencies - $81,000)

 

10(74) SR 2045 Highway Portion Bridge
11Replacement, SR 2045 (Monterey Road)
12over Mill Creek, Upper Leacock
13Township, Project ID 87501

 

14Project Allocation

552,000

15(Base Project Allocation - $552,000)

 

16(75) SR 4020, Interchange Reconstruction,
17US 30 and SR 4020 (Harrisburg Pike)
18Interchange, City of Lancaster,
19Manheim Township, Project ID 80930

 

20Project Allocation

3,226,000

21(Land Allocation - $225,000)

 

22(Design & Contingencies - $3,001,000)

 

23(76) SR 2029, Resurface, SR 2029 from PA
24462 to Strasburg Borough, East
25Lampeter, Strasburg and West Lampeter
26Townships, Strasburg Borough, Project
27ID 82480

 

28Project Allocation

1,483,000

29(Base Project Allocation - $1,442,000)

 

30(Land Allocation - $6,000)

 

1(Design & Contingencies - $35,000)

 

2(77) SR 0230, Safety Improvements, PA 230
3(Main Street), Mount Joy Borough,
4Rapho Township, Project ID 83791

 

5Project Allocation

95,000

6(Base Project Allocation - $95,000)

 

7(78) SR 4002, Highway Portion Bridge
8Replacement, SR 4002 (Donegal Springs
9Road) over Tributary of Donegal Creek,
10East Donegal Township, Project ID
1187537

 

12Project Allocation

142,000

13(Base Project Allocation - $142,000)

 

14(79) SR 3017, Highway Portion Bridge
15Replacement, SR 3017 (River Road) over
16Branch of Pequea Creek, Martic
17Township, Project ID 87540

 

18Project Allocation

123,000

19(Base Project Allocation - $123,000)

 

20(80) SR 0741, Sight Distance Improvement
21at Intersection, Intersection of PA
22741 and SR 2035 Belmont Road, Paradise
23Township, Project ID 85656

 

24Project Allocation

178,000

25(Base Project Allocation - $160,000)

 

26(Design & Contingencies - $18,000)

 

27(81) SR 0222, Resurface, US 222 (Prince
28Street) from King Street to North
29Street, US 222 (Duke Street) from
30South Queen Street to Lime Street, SR

 

12041 (Duke Street) from McGovern
2Avenue to Orange Street, City of
3Lancaster, Manheim Township, Project
4ID 93088

 

5Project Allocation

2,890,000

6(Base Project Allocation - $2,890,000)

 

7(82) SR 0030, Mill and Resurface, US 30
8(Lincoln Highway) from Wrights Ferry
9Bridge to PA 741 (Rohrerstown Road),
10Columbia Borough, East Hempfield
11Township, Mountville Borough, West
12Hempfield Township, Project ID 92946

 

13Project Allocation

2,000,000

14(Base Project Allocation - $2,000,000)

 

15(83) SR 1061, Highway Portion Bridge
16Replacement, SR 1061 (Willow Street)
17over Little Muddy Creek, Adamstown
18Borough, Project ID 87524

 

19Project Allocation

138,000

20(Base Project Allocation - $138,000)

 

21(84) SR 1021, Highway Portion Bridge
22Replacement, SR 1021 (Spring Grove
23Road) over Conestoga River, East Earl
24Township, Project ID 87521

 

25Project Allocation

467,000

26(Base Project Allocation - $467,000)

 

27(85) SR 0772, Highway Portion Bridge
28Replacement, PA 772 over a Storm
29Drain, Warwick Township, Project ID
3087538

 

1Project Allocation

131,000

2(Base Project Allocation - $131,000)

 

3(86) SR 0324, Resurface, PA 324 (Pequea
4Boulevard/Martic Forge Road) from
5River Hill Road to Colemanville Road,
6Conestoga and Martic Townships,
7Project ID 100475

 

8Project Allocation

2,100,000

9(Base Project Allocation - $2,100,000)

 

10(87) SR 0241, Resurface, PA 241 (Mount
11Gretna Road) from PA 743 (Hershey
12Road) to Lebanon County Line, Mount
13Joy Township, Project ID 100471

 

14Project Allocation

2,200,000

15(Base Project Allocation - $2,200,000)

 

16(88) SR 0272, Resurface, PA 272
17(Nottingham Road) from US 222 (Robert
18Fulton Highway) to SR 2003 (Little
19Britain Road), Fulton and Little
20Britain Townships, Project ID 100383

 

21Project Allocation

2,000,000

22(Base Project Allocation - $2,000,000)

 

23(89) SR 0300, Highway Portion Bridge
24Preservations, SR 0300, Various
25Municipalities, Project ID 99179

 

26Project Allocation

3,260,000

27(Base Project Allocation - $3,260,000)

 

28(90) SR 0462, Safety Improvement, PA 462
29(Columbia Avenue) and Race Avenue
30Intersection, Lancaster Township,

 

1Project ID 99194

 

2Project Allocation

301,000

3(Base Project Allocation - $250,000)

 

4(Design & Contingencies - $51,000)

 

5(91) SR 0072, Rehabilitation, Resurface,
6PA 72 from Chiques Creek to Lebanon
7County Line, Manheim Borough, Penn and
8Rapho Townships, Project ID 102174

 

9Project Allocation

3,000,000

10(Base Project Allocation - $3,000,000)

 

11(92) SR 0722, Resurface, PA 722 (Oregon
12Road) from PA 501 (Lititz Pike) to PA
13272 (Oregon Pike), Manheim Township,
14Project ID 100481

 

15Project Allocation

2,100,000

16(Base Project Allocation - $2,100,000)

 

17Section 337. Lawrence County.

18Projects are as follows:

 

19(1) (Reserved).

 

20(2) SR 0422, Patch and Overlay, SR 422,
21Turnpike to Moravia (SR 0168),
22Shenango Township, Project ID 92282

 

23Project Allocation

4,800,000

24(Base Project Allocation - $4,800,000)

 

25(3) SR 0158, Reconstruction, SR 158
26(North Jefferson Street) from Phillips
27School Road to New Wilmington Borough
28Line, New Wilmington Borough,
29Wilmington Township, Project ID 91753

 

30Project Allocation

201,000

1(Design & Contingencies - $201,000)

 

2(4) SR 0168, Resurface, SR 0168 from SR
30108 to SR 0208, Hickory Township,
4City of New Castle, Washington and
5Wilmington Townships, Project ID 91755

 

6Project Allocation

3,762,000

7(Base Project Allocation - $3,461,000)

 

8(Design & Contingencies - $301,000)

 

9(5) SR 0422, Patch and Overlay, Union
10Township to SR 0060, Union Township,
11Project ID 92281

 

12Project Allocation

228,000

13(Base Project Allocation - $228,000)

 

14(6) SR 0224, Pavement Reconstruction, SR
150224 from Carbon Micco to the Norfolk
16Southern Railroad Bridge, Mahoning
17Township, Project ID 91762

 

18Project Allocation

6,440,000

19(Base Project Allocation - $5,864,000)

 

20(Design & Contingencies - $576,000)

 

21(7) SR 0168, Pavement Reconstruction, SR
220168 from Mallory to SR 0018, New
23Beaver Borough, North Beaver Township,
24Project ID 91764

 

25Project Allocation

3,473,000

26(Base Project Allocation - $3,272,000)

 

27(Design & Contingencies - $201,000)

 

28(8) SR 1002, Pavement Reconstruction, SR
291002 from Pulaski to SR 0168, Hickory
30and Neshannock Townships, Project ID

 

191766

 

2Project Allocation

776,000

3(Base Project Allocation - $526,000)

 

4(Design & Contingencies - $250,000)

 

5(9) SR 1007, Pavement Reconstruction, SR
61007 from SR 0065 to SR 2004, City of
7New Castle, Shenango Township, Project
8ID 91767

 

9Project Allocation

3,335,000

10(Base Project Allocation - $3,135,000)

 

11(Design & Contingencies - $200,000)

 

12(10) SR 0488, Resurface, SR 0488
13(Portersville Road) From SR 2009
14(North Tower Road) to the Butler
15County Line in Perry Township, Perry
16Township, Project ID 91769

 

17Project Allocation

3,412,000

18(Base Project Allocation - $3,161,000)

 

19(Design & Contingencies - $251,000)

 

20(11) SR 0065, Highway Reconstruction, SR
210065 Ellwood Road from Friday Hill
22Road to Garner Stop Road, Wayne,
23Slippery Rock and Shenango Townships,
24Project ID 91768

 

25Project Allocation

4,700,000

26(Base Project Allocation - $4,250,000)

 

27(Design & Contingencies - $450,000)

 

28(12) SR 0351, Pavement Reconstruction, SR
290351 from the State Line to SR 0551,
30Little Beaver Township, Project ID

 

191765

 

2Project Allocation

2,251,000

3(Base Project Allocation - $2,001,000)

 

4(Design & Contingencies - $250,000)

 

5(13) SR 0018, Highway Reconstruction, SR
60018 Mahoning Avenue, Liberty Street
7from the Beaver County Line to SR
80108, New Beaver and Wampum Boroughs,
9North Beaver and Taylor Townships,
10City of New Castle, Project ID 88284

 

11Project Allocation

920,000

12(Base Project Allocation - $920,000)

 

13(14) SR 0376, Milling and Overlay, I-376
14from State Street to Turnpike, Union
15Township, Project ID 97614

 

16Project Allocation

553,000

17(Base Project Allocation - $460,000)

 

18(Design & Contingencies - $93,000)

 

19(15) SR 0288, Highway Portion Bridge
20Replacement, SR 0288 (Main Street)
21over Wampum Creek, Wampum Borough,
22Project ID 90090

 

23Project Allocation

751,000

24(Base Project Allocation - $191,000)

 

25(Land Allocation - $387,000)

 

26(Design & Contingencies - $173,000)

 

27(16) SR 0168, Resurface, SR 0168
28Eastbrook Road from the Beaver County
29Line to SR 0018, North Beaver
30Township, New Beaver Borough, Project

 

1ID 79441

 

2Project Allocation

5,000,000

3(Base Project Allocation - $5,000,000)

 

4(17) SR 0065, Highway Reconstruction,
5Located on SR 0065, Ellwood Road, from
6Fridays Hill Road to SR 0422 Ramps,
7Shenango, Slippery Rock and Wayne
8Townships, Project ID 91575

 

9Project Allocation

758,000

10(Base Project Allocation - $557,000)

 

11(Design & Contingencies - $201,000)

 

12(18) SR 0422, Reconstruct, SR 0422
13(Benjamin Franklin Highway) from Line
14Avenue to New Butler Road, Shenango
15Township, Project ID 79449

 

16Project Allocation

760,000

17(Base Project Allocation - $760,000)

 

18(19) I-79, Highway Reconstruction,
19Rehabilitation, I-79, Butler County
20Line to Mercer County Line, Plain
21Grove Township, Project ID 87757

 

22Project Allocation

1,940,000

23(Base Project Allocation - $1,640,000)

 

24(Design & Contingencies - $300,000)

 

25(20) SR 0224, Reconstruction, SR 0224,
26State Street, from SR 0422 to SR 0018,
27City of New Castle, Union Township,
28Project ID 88278

 

29Project Allocation

1,584,000

30(Base Project Allocation - $1,584,000)

 

1(21) SR 0422, Reconstruction and
2Guiderail, Drainage Improvements, SR
30422 from Business 422 to SR 0060,
4Union Township, City of New Castle,
5Taylor and Shenango Townships, Project
6ID 88376

 

7Project Allocation

1,472,000

8(Base Project Allocation – $1,440,000)

 

9(Design & Contingencies - $32,000)

 

10(22) SR 4002, Highway Reconstruction,
11Rehabilitation, SR 4002, Sampson
12Street, from SR 0060 to Beginning of
13Asphalt Overlay, Union Township,
14Project ID 81624

 

15Project Allocation

283,000

16(Base Project Allocation - $283,000)

 

17(23) SR 0224, Pavement Reconstruction, SR
180224 (State Street) from McClelland to
19Sampson, City of New Castle, Project
20ID 91761

 

21Project Allocation

3,790,000

22(Base Project Allocation - $3,540,000)

 

23(Design & Contingencies - $250,000)

 

24(24) SR 0488, Highway Portion Bridge
25Rehabilitation, carrying Portersville
26Road over Slippery Rock Creek, Perry
27and Wayne Townships, Project ID 91921

 

28Project Allocation

455,000

29(Base Project Allocation - $177,000)

 

30(Land Allocation - $76,000)

 

1(Design & Contingencies - $202,000)

 

2(25) SR 0208, Bituminous Overlay, SR
30208, Pulaski Road, from the Ohio
4State Line to Shenango River, Pulaski
5Township, Project ID 96714

 

6Project Allocation

1,131,000

7(Base Project Allocation - $1,131,000)

 

8(26) SR 0108, Highway Reconstruction, SR
90108, Croton Road from SR 0018 to
10Crownhome, Segments 0180 and 0181,
11City of New Castle, Project ID 91752

 

12Project Allocation

3,460,000

13(Base Project Allocation - $3,260,000)

 

14(Design & Contingencies - $200,000)

 

15(27) SR 0079, Pavement Reconstruction and
16Rehabilitation, Butler County to
17Mercer County, from Mile Posts 105 to
18110, Plain Grove Township, Project ID
1994815

 

20Project Allocation

3,502,000

21(Base Project Allocation - $3,401,000)

 

22(Design & Contingencies - $101,000)

 

23(28) SR 2032, Resurface, Cherry Street
24from Liberty Street to Third Street,
25City of New Castle, Taylor Township,
26Project ID 100928

 

27Project Allocation

114,000

28(Base Project Allocation - $114,000)

 

29(29) SR 1005, Resurface, SR 1005 from
30Mill Street to Englewood Avenue,

 

1Neshannock Township, City of New
2Castle, Project ID 100921

 

3Project Allocation

1,200,000

4(Base Project Allocation - $1,200,000)

 

5(30) SR 1005, Resurface, SR 1005,
6Highland Avenue from Maitland Lane to
7the Mercer County Line, Neshannock and
8Wilmington Townships, Project ID
9100922

 

10Project Allocation

665,000

11(Base Project Allocation - $665,000)

 

12(31) SR 1022, Resurface, Country View
13Road from Perry Highway to Country
14View Township Road, Scott and Slippery
15Rock Townships, Project ID 100923

 

16Project Allocation

48,000

17(Base Project Allocation - $48,000)

 

18(32) SR 2020, Resurface, Pleasant Hill
19Road from Ellwood, Portersville Road
20to Pleasant Hill Township Road, Perry
21Township, Project ID 100924

 

22Project Allocation

304,000

23(Base Project Allocation - $304,000)

 

24(33) SR 4012, Reconstruct, Mitchell Road
25from Ramps at I-376 to PA 18
26(Wilmington Road), Neshannock
27Township, Project ID 100934

 

28Project Allocation

485,000

29(Base Project Allocation - $485,000)

 

30(34) SR 0018, Resurface, PA 18 from

 

1Beaver County Line to Mahoning River,
2New Beaver Borough, City of New
3Castle, North Beaver Township, Wampum
4Borough, Project ID 100916

 

5Project Allocation

1,079,000

6(Base Project Allocation - $1,079,000)

 

7(35) SR 0018, Reconstruct, Wilmington
8Road from Grove Street to Mercer
9County Line, Neshannock Township, City
10of New Castle, North Beaver Township,
11Project ID 100917

 

12Project Allocation

2,964,000

13(Base Project Allocation - $2,964,000)

 

14(36) SR 0108, Reconstruct, Mount Jackson
15Road from Turnpike Toll Ramp to Parady
16Avenue, Hickory Township, City of New
17Castle, North Beaver Township, Project
18ID 100918

 

19Project Allocation

408,000

20(Base Project Allocation - $408,000)

 

21(37) SR 0224, Reconstruct, State Street
22from Carbon Micco Road to PA 18
23(Jefferson Street), Mahoning Township,
24City of New Castle, Union Township,
25Project 100920

 

26Project Allocation

2,660,000

27(Base Project Allocation - $2,660,000)

 

28(38) SR 0168, Reconstruct, Third Street
29from Cherry Street to PA 208, Hickory
30Township, City of New Castle, Taylor,

 

1Washington and Wilmington Townships,
2Project ID 10019

 

3Project Allocation

2,717,000

4(Base Project Allocation - $2,717,000)

 

5(39) SR 4008, Resurface, High Hill Road
6from Evergreen Road to PA 208 (Pulaski
7Road), Pulaski Township, Project ID
8100933

 

9Project Allocation

595,000

10(Base Project Allocation - $595,000)

 

11(40) SR 2012, Highway Portion Bridge
12Replacement, SR 2012 over Branch of
13McKee Run, Taylor Township, Project ID
1499798

 

15Project Allocation

10,000,000

16(Base Project Allocation -
17$10,000,000)

 

18(41) SR 3004, Resurface, SR 3004 from the
19Ohio State Line to Mount Air Road,
20North Beaver Township, Project ID
21100929

 

22Project Allocation

565,000

23(Base Project Allocation - $565,000)

 

24(42) I-79, Reconstruction, I-79 from the
25Butler County Line to the Mercer
26County Line, Various Municipalities,
27Project ID 0

 

28Project Allocation

21,600,000

29(Base Project Allocation -
30$21,600,000)

 

1(43) SR 3009, Resurface, Mount Air Road
2from Moravia Road to Mount Jackson
3Road, North Beaver Township, Project
4ID 100930

 

5Project Allocation

485,000

6(Base Project Allocation - $485,000)

 

7(44) SR 4005, Resurface, SR 4005 from SR
84004 to PA 208, Neshannock and Pulaski
9Townships, Project ID 100932

 

10Project Allocation

806,000

11(Base Project Allocation - $806,000)

 

12(45) SR 3003, Highway Portion Bridge
13Replacement, SR 3003, State Line Road
14over Hickory Creek, North Beaver
15Township, Project ID 99797

 

16Project Allocation

10,000,000

17(Base Project Allocation -
18$10,000,000)

 

19(46) SR 2030, Resurface, Mountville Road
20from Heinz Camp Road to Portersville
21Road, Perry, Slippery Rock and Wayne
22Townships, Project ID 100927

 

23Project Allocation

366,000

24(Base Project Allocation – $366,000)

 

25(47) SR 2028, Resurface, Fairview School
26Road from Center Church Road to Mill
27Bridge Road, Slippery Rock Township,
28Project ID 100926

 

29Project Allocation

412,000

30(Base Project Allocation - $412,000)

 

1(48) SR 2024, Resurface, Hogue Road from
2Ellwood Road to Heinz Camp Road,
3Slippery Rock Township, Project ID
4100925

 

5Project Allocation

222,000

6(Base Project Allocation - $222,000)

 

7(49) SR 3014, Resurface, Roslyn Road from
8Larchwood Drive to Rosyln Township
9Road, New Beaver Borough, Project ID
10100931

 

11Project Allocation

850,000

12(Base Project Allocation - $850,000)

 

13(50) I-376, Reconstruction, I-376 from
14the Beaver County Line to the Mercer
15County Line, Various Municipalities,
16Project ID 0

 

17Project Allocation

41,200,000

18(Base Project Allocation -
19$41,200,000)

 

20Section 338. Lebanon County.

21Projects are as follows:

 

22(1) (Reserved).

 

23(2) SR 0934, Resurface, PA 934 from US
24322 to US 422, Annville and South
25Annville Townships, Project ID 97966

 

26Project Allocation

680,000

27(Base Project Allocation - $340,000)

 

28(Design and Contingencies - $340,000)

 

29(3) SR 4025, Resurfacing and Drainage
30Improvement, SR 4025 (Gold Mine Road)

 

1from Dauphin County Line to Union
2Township, Cold Spring Township,
3Project ID 90889

 

4Project Allocation

1,820,000

5(Base Project Allocation - $1,820,000)

 

6(4) SR 0897, Resurface, SR 0897 from the
7Lancaster County Line to Evergreen
8Road, Heidelberg and South Lebanon
9Townships, Project ID 97965

 

10Project Allocation

760,000

11(Base Project Allocation - $760,000)

 

12(5) SR 0422, Reconstruction and Sinkhole
13Repairs, US 422 (Main Street) from
14Duke Street to Shady Lane, North
15Londonderry Township, Palmyra Borough,
16Project ID 90220

 

17Project Allocation

532,000

18(Base Project Allocation - $373,000)

 

19(Land Allocation - $9,000)

 

20(Design and Contingencies - $150,000)

 

21(6) SR 2003, Resurface, SR 2003 (State
22Drive) from Lebanon City Line to South
23of Klein Avenue, South Lebanon
24Township, Project ID 90884

 

25Project Allocation

574,000

26(Base Project Allocation - $287,000)

 

27(Design and Contingencies - $287,000)

 

28(7) SR 0934, Resurface, PA 934
29(Bellegrove Road/Fisher Avenue) from
30SR 4008 (Palmyra-Bellegrove Road/

 

1Harrison Drive) to Jonestown Road,
2East Hanover and North Annville
3Townships, Project ID 82596

 

4Project Allocation

2,327,000

5(Base Project Allocation - $2,300,000)

 

6(Land Allocation - $9,000)

 

7(Design and Contingencies - $18,000)

 

8(8) SR 0501, Highway Portion Bridge
9Replacement, PA 501 over Tulpehocken
10Creek, Myerstown Borough, Project ID
1191346

 

12Project Allocation

730,000

13(Base Project Allocation - $511,000)

 

14(Land Allocation - $73,000)

 

15(Design and Contingencies - $146,000)

 

16(9) SR 1001, Highway Portion Bridge
17Replacement, SR 1011 (Mount Zion Road)
18over Tributary of Swatara Creek, North
19Lebanon Township, Project ID 90998

 

20Project Allocation

1,113,000

21(Base Project Allocation - $757,000)

 

22(Land Allocation - $48,000)

 

23(Design and Contingencies - $308,000)

 

24(10) SR 0934, Highway Portion Bridge
25Replacement, PA 934 (Bellegrove
26Road/Fisher Avenue/White Oak Street)
27over Tributary of Swatara Creek, North
28Annville Township, Project ID 90999

 

29Project Allocation

1,269,000

30(Base Project Allocation - $826,000)

 

1(Land Allocation - $59,000)

 

2(Design and Contingencies - $384,000)

 

3(11) SR 0241, Safety Improvements, PA 241
4(Colebrook Road) from US 322
5(Horseshoe Road) to City of Lebanon
6Limit, North Cornwall and West
7Cornwall Townships, Project ID 96783

 

8Project Allocation

601,000

9(Base Project Allocation - $601,000)

 

10(12) SR 0072, Left Turn Lane and Signal
11Upgrade, Intersection of PA 72
12(Quentin Road) and PA 419 (Main
13Street), West Cornwall Township,
14Project ID 88084

 

15Project Allocation

401,000

16(Land Allocation - $101,000)

 

17(Design and Contingencies - $300,000)

 

18(13) SR 2001, Intersection Improvements,
19Intersection of SR 2001 (Cornwall
20Road) and Wilhelm Avenue, City of
21Lebanon, Project ID 93089

 

22Project Allocation

1,500,000

23(Base Project Allocation - $1,500,000)

 

24(14) SR 2012, Resurface, SR 2012 (Race
25Street) from SR 2019 (Main Street) to
26the Berks County Line, Millcreek
27Township, Richland Borough, Project ID
2890872

 

29Project Allocation

2,101,000

30(Base Project Allocation - $1,401,000)

 

1(Design & Contingencies - $700,000)

 

2(15) SR 0072, Resurface, PA 72 (Quentin
3Road) from City of Lebanon Line to
4South of York Street, North Cornwall
5Township, Project ID 90875

 

6Project Allocation

324,000

7(Base Project Allocation - $162,000)

 

8(Design & Contingencies - $162,000)

 

9(16) SR 0501, Resurface, PA 501 (College
10Street) from PA 419 (Main Street) to
11North of US 422 (Cumberland
12Street/Lincoln Avenue), Heidelberg and
13Jackson Townships, Myerstown Borough,
14Project ID 90880

 

15Project Allocation

3,500,000

16(Base Project Allocation - $3,500,000)

 

17(17) I-81, Highway Reconstruction, I-81
18from I-78 to the Schuylkill County
19Line, Bethel, Swatara and Union
20Townships, Project ID 92232

 

21Project Allocation

200,000

22(Base Project Allocation - $180,000)

 

23(Design & Contingencies - $20,000)

 

24(18) I-78, Highway Reconstruction, I-78
25from I-81 to the Schuylkill County
26Line, Bethel, Swatara and Union
27Townships, Project ID 92233

 

28Project Allocation

200,000

29(Base Project Allocation - $180,000)

 

30(Design & Contingencies - $20,000)

 

1(19) SR 4020, Resurface, SR 4020 (Fisher
2Avenue) from SR 4019 (Asher Miner
3Road) to PA 72 (Ebenezer Road), East
4Hanover and Union Townships, Project
5ID 96319

 

6Project Allocation

177,000

7(Base Project Allocation - $177,000)

 

8(20) SR 0072, Resurface, PA 72 (Ebenezer
9Road) from Jonestown Road to North of
10I-78, Union Township, Project ID 96318

 

11Project Allocation

83,000

12(Base Project Allocation - $83,000)

 

13(21) SR 0022, Highway Portion Bridge
14Replacement, US 22 (Allentown
15Boulevard) over Beach Run, Bethel
16Township, Project ID 97148

 

17Project Allocation

221,000

18(Base Project Allocation - $221,000)

 

19(22) SR 0022, Highway Portion Bridge
20Replacement, US 22 (Allentown
21Boulevard) over Elizabeth Run, Bethel
22Township, Project ID 87480

 

23Project Allocation

192,000

24(Base Project Allocation - $126,000)

 

25(Land Allocation - $5,000)

 

26(Design & Contingencies - $61,000)

 

27(23) SR 0422, Highway portion Bridge
28Replacement, US 422 over Quitapahilla
29Creek, City of Lebanon, South Lebanon
30Township, Project ID 87471

 

1Project Allocation

83,000

2(Land Allocation - $6,000)

 

3(Design & Contingencies - $77,000)

 

4(24) SR 0117, Resurface, PA 117 (Forge
5Road/Mount Wilson Road) from
6Roundabout to SR 3005 (Manheim Road),
7South Annville and South Londonderry
8Townships, Project ID 91002

 

9Project Allocation

512,000

10(Base Project Allocation - $402,000)

 

11(Design & Contingencies - $110,000)

 

12(25) SR 3017, Drainage Improvement,
13Roadway Resurface, Realignment and
14Widening, SR 3017 (Lingle Road) from
15Palmyra Borough Line to SR 3019
16(Palmyra Road), North Londonderry
17Township, Palmyra Borough, South
18Londonderry Township, Project ID 97153

 

19Project Allocation

1,000,000

20(Base Project Allocation - $1,000,000)

 

21(26) SR 2001, Intersection Improvement,
22Cornwall Road (SR 2001) and Isabel
23Drive, North Cornwall Township,
24Project ID 96108

 

25Project Allocation

2,706,000

26(Base Project Allocation - $2,559,000)

 

27(Land Allocation - $76,000)

 

28(Design & Contingencies - $71,000)

 

29(27) SR 0022, Highway Reconstruction, US
3022 from Lancaster Street to SR 0343,

 

1Bethel and Swatara Townships, Project
2ID 88320

 

3Project Allocation

1,620,000

4(Base Project Allocation - $1,595,000)

 

5(Land Allocation - $10,000)

 

6(Design & Contingencies - $15,000)

 

7(28) SR 2001, Intersection Improvements,
8Intersection Cornwall Road (SR 2001)
9and Rocherty Road (SR 2002), North
10Cornwall Township, Project ID 95777

 

11Project Allocation

2,100,000

12(Base Project Allocation - $1,800,000)

 

13(Land Allocation - $150,000)

 

14(Design & Contingencies - $150,000)

 

15(29) SR 0072, Intersection Improvements,
16Intersection PA 72 and Rocherty Road,
17North Cornwall Township, Project ID
1895775

 

19Project Allocation

3,676,000

20(Base Project Allocation - $3,275,000)

 

21(Land Allocation - $251,000)

 

22(Design & Contingencies - $150,000)

 

23(30) SR 2001, Safety Improvements, SR
242001 (Cornwall Road) from Wilhelm
25Avenue to York Street, City of
26Lebanon, North Cornwall Township,
27Project ID 97161

 

28Project Allocation

280,000

29(Base Project Allocation - $280,000)

 

30(31) SR 0072, Upgrade Signalized

 

1Intersection, Intersection of PA 72
2(Ebenezer Road) and T-601 (Jonestown
3Road), Union Township, Project ID
487156

 

5Project Allocation

217,000

6(Base Project Allocation - $217,000)

 

7(32) SR 0072, Resurface, PA 72 (Ebenezer
8Road) from Jonestown Road to Horst
9Drive, North Lebanon, Swatara and
10Union Townships, Project ID 90877

 

11Project Allocation

1,756,000

12(Base Project Allocation - $1,731,000)

 

13(Design & Contingencies - $25,000)

 

14(33) SR 0422, Resurface, US 422 from PA
15501 to the Berks County Line, Jackson
16Township, Myerstown Borough, Project
17ID 97271

 

18Project Allocation

288,000

19(Base Project Allocation - $288,000)

 

20(34) SR 0422, Intersection Improvement,
21Intersection of PA 422 (Cumberland
22Street) and Ramona Road, Jackson
23Township, Project ID 94937

 

24Project Allocation

292,000

25(Base Project Allocation - $292,000)

 

26(35) SR 0422, Intersection and Safety
27Improvements, US 422 from PA 645 to
28Martin Drive, Jackson Township,
29Myerstown Borough, Project ID 94936

 

30Project Allocation

750,000

1(Base Project Allocation - $150,000)

 

2(Land Allocation - $150,000)

 

3(Design & Contingencies - $450,000)

 

4(36) SR 4004, Resurface, SR 4004 (Hill
5Church Road) from Ono Road to North
6Center Street, Cleona Borough, North
7Annville Township, Project ID 100254

 

8Project Allocation

1,300,000

9(Base Project Allocation - $1,300,000)

 

10(37) SR 0422, Resurface, US 422 (Main
11Street) from East of Killinger Road to
1225th Street, Annville Township, Cleona
13Borough, North Annville, North
14Cornwall and North Lebanon Townships,
15Project ID 100251

 

16Project Allocation

723,000

17(Base Project Allocation - $723,000)

 

18(38) SR 4001, Resurface, SR 4001 (16th,
1922nd and Lehman Streets), City of
20Lebanon, North Lebanon and West
21Lebanon Townships, Project ID 100248

 

22Project Allocation

800,000

23(Base Project Allocation - $800,000)

 

24(39) SR 4022, Resurface, SR 4022 (Clement
25Avenue) from Asher Minor Road to
26Fisher Avenue, East Hanover and Union
27Townships, Project ID 100257

 

28Project Allocation

800,000

29(Base Project Allocation - $800,000)

 

30(40) SR 0322, Resurface, US 322

 

1(Horseshoe Pike), Cornwall Borough,
2South Annville, South Lebanon, South
3Londonderry and West Cornwall
4Townships, Project ID 100243

 

5Project Allocation

8,000,000

6(Base Project Allocation - $8,000,000)

 

7(41) I-81, Reconstruction, I-81 from the
8Dauphin County Line to the Schuylkill
9County Line, Various Municipalities,
10Project ID 0

 

11Project Allocation

61,000,000

12(Base Project Allocation -
13$61,000,000)

 

14(42) SR 0022, Safety Improvements, US 22
15at Blue Mountain Road Intersection,
16Bethel Township, Project ID 98202

 

17Project Allocation

400,000

18(Base Project Allocation - $400,000)

 

19(43) SR 2001 and SR 2002, Safety
20Improvements, SR 2001 Cornwall Road
21and SR 2002 Rocherity Road in the Area
22of Lebanon Valley Expo Center, North
23Cornwall Township, Project ID 0

 

24Project Allocation

5,000,000

25(Base Project Allocation - $5,000,000)

 

26(44) I-78, Reconstruction, I-78 from
27Western Terminus at I-81 to the Berks
28County Line, Various Municipalities,
29Project ID 0

 

30Project Allocation

33,800,000

1(Base Project Allocation -
2$33,800,000)

 

3(45) Various Major Highways, Install ITS
4Equipment, I-81 and I-78 and Various
5Major Highways, Various
6Municipalities, Project ID 83615

 

7Project Allocation

10,000,000

8(Base Project Allocation -
9$10,000,000)

 

10Section 339. Lehigh County.

11Projects are as follows:

 

12(1) SR 0222, Highway Portion Bridge
13Replacement, US 222 over Iron Run,
14Upper Macungie Township, Project ID
1589639

 

16Project Allocation

1,802,000

17(Base Project Allocation - $1,800,000)

 

18(Land Allocation - $1,000)

 

19(Design and Contingencies - $1,000)

 

20(2) SR 0145, Highway Rehabilitation
21Associated with Bridge Work, Wire Mill
22Bridge Lehigh Street (SR 0145) over
23Little Lehigh Creek, City of
24Allentown, Project ID 94682

 

25Project Allocation

411,000

26(Base Project Allocation - $318,000)

 

27(Land Allocation - $6,000)

 

28(Design & Contingencies - $87,000)

 

29(3) SR 0378, Install High Tension Cable
30Median Barrier, PA 378 North from

 

1Broad Street Overpass to US 22
2Interchange, City of Bethlehem,
3Project ID 95190

 

4Project Allocation

140,000

5(Base Project Allocation - $140,000)

 

6(4) SR 0100, Highway Reconstruction, SR
70100 from Clausville Road to Route
8309, Heidelberg and Lowhill Townships,
9Project ID 11616

 

10Project Allocation

1,675,000

11(Base Project Allocation - $875,000)

 

12(Land Allocation - $500,000)

 

13(Design and Contingencies - $300,000)

 

14(5) SR 2026, Highway Portion of Bridge
15Rehabilitation, SR 2026 (East Station
16Avenue) over Tributary of Saucon
17Creek, Coopersburg Borough, Project ID
1847647

 

19Project Allocation

2,385,000

20(Base Project Allocation - $1,847,000)

 

21(Land Allocation - $49,000)

 

22(Design & Contingencies - $489,000)

 

23(6) SR 0078, Highway Resurface, I-78 from
24SR 3015 (Adams Road) Overpass to Exit
2557 (Lehigh Street), City of Allentown,
26Lower Macungie, Salisbury, South
27Whitehall and Upper Macungie
28Townships, Project ID 87646

 

29Project Allocation

3,251,000

30(Base Project Allocation - $2,750,000)

 

1(Design & Contingencies - $501,000)

 

2(7) SR 0022, Guide Sign Replacements and
3Upgrades, Various Locations on US 22,
4PA 309, I-78, PA 33 and I-78, Various
5Municipalities, Project ID 91957

 

6Project Allocation

780,000

7(Base Project Allocation - $780,000)

 

8(8) SR 0145, Highway Resurface, MacArthur
9Road (PA 145) from Grape Street to PA
10329, Whitehall Township, Project ID
1196387

 

12Project Allocation

6,253,000

13(Base Project Allocation - $6,251,000)

 

14(Land Allocation - $1,000)

 

15(Design & Contingencies - $1,000)

 

16(9) SR 0309, Reconstruction, PA 309 from
17I-78 Overpass to Crackerport Road,
18Lower Macungie, South Whitehall and
19Upper Macungie Townships, Project ID
2096432

 

21Project Allocation

88,499,000

22(Base Project Allocation -
23$68,144,000)

 

24(Land Allocation - $10,620,000)

 

25(Design & Contingencies - $9,735,000)

 

26(10) SR 0309, Highway Resurface, PA 309
27from SR 4010 (Sand Spring Road) to PA
28100, Heidelberg and North Whitehall
29Townships, Project ID 96386

 

30Project Allocation

3,102,000

1(Base Project Allocation - $3,100,000)

 

2(Land Allocation - $1,000)

 

3(Design & Contingencies - $1,000)

 

4(11) SR 2005, Rehabilitation, SR 2005
5(Lehigh Street) from PA 29 to PA 145,
6City of Allentown, Emmaus Borough,
7Salisbury Township, Project ID 96413

 

8Project Allocation

6,003,000

9(Base Project Allocation - $6,001,000)

 

10(Land Allocation - $1,000)

 

11(Design & Contingencies - $1,000)

 

12(12) SR 0022, Roadway Widening, US 22
13from 15th Street to Airport Road, City
14of Bethlehem, Hanover, South Whitehall
15and Whitehall Townships, Project ID
1696384

 

17Project Allocation

183,223,000

18(Base Project Allocation -
19$165,222,000)

 

20(Land Allocation - $8,000,000)

 

21(Design & Contingencies - $10,001,000)

 

22(13) (Reserved).

 

23(14) SR 1029, Construct New Bridge, Fifth
24Street (SR 1029) over SR 0022,
25Whitehall Township, Project ID 94873

 

26Project Allocation

455,000

27(Base Project Allocation - $248,000)

 

28(Land Allocation – $184,000)

 

29(Design & Contingencies - $23,000)

 

30(15) SR 2005, Safety Improvement, 12

 

1Intersections on Lehigh Street from
28th Street (SR 2055) to 31st
3Street/Oxford Drive (SR 2007), City of
4Allentown, Project ID 94871

 

5Project Allocation

122,000

6(Base Project Allocation - $122,000)

 

7(16) SR 6222, Highway Restoration,
8Hamilton Boulevard from SR 0222 to
9Kressler Road, Lower Macungie and
10Upper Macungie Townships, Project ID
1194863

 

12Project Allocation

458,000

13(Base Project Allocation - $442,000)

 

14(Design & Contingencies - $16,000)

 

15(17) SR 0309, Highway Resurface, SR 0309
16Segments 0224/0225 BIT Paved Section
17to Chapmans Road/Pope Road, South
18Whitehall Township, Project ID 94859

 

19Project Allocation

731,000

20(Base Project Allocation - $716,000)

 

21(Design & Contingencies - $15,000)

 

22(18) SR 0222, Highway Widening to Four
23Lanes, US 222 from the Berks/Lehigh
24County Line Northward to US 222
25Trexlertown Bypass, Upper Macungie
26Township, Project ID 97227

 

27Project Allocation

302,000

28(Base Project Allocation - $300,000)

 

29(Land Allocation - $1,000)

 

30(Design & Contingencies - $1,000)

 

1(19) SR 4003, Highway Portion Bridge
2Replacement, SR 4003 over Jordan
3Creek, North Whitehall Township,
4Project ID 89627

 

5Project Allocation

1,102,000

6(Base Project Allocation - $1,100,000)

 

7(Land Allocation - $1,000)

 

8(Design & Contingencies - $1,000)

 

9(20) SR 1004, Highway Portion Bridge
10Replacement, SR 1004 over Catasauqua
11Creek, Catasauqua Borough, Project ID
1289633

 

13Project Allocation

1,002,000

14(Base Project Allocation - $1,000,000)

 

15(Land Allocation - $1,000)

 

16(Design & Contingencies - $1,000)

 

17(21) SR 0022, Highway Resurface, US 22
18from I-78 to 15th Street, South
19Whitehall, Upper Macungie and
20Whitehall Townships, Project ID 96385

 

21Project Allocation

20,002,000

22(Base Project Allocation -
23$20,000,000)

 

24(Land Allocation - $1,000)

 

25(Design & Contingencies - $1,000)

 

26(22) SR 0022, Reconstruction/Widening, US
2722 from 15th Street Exit West to SR
280309 Exit and Airport Road to PA 512,
29City of Bethlehem, Hanover, South
30Whitehall and Whitehall Townships,

 

1Project ID 97376

 

2Project Allocation

213,000,000

3(Base Project Allocation -
4$200,000,000)

 

5(Land Allocation - $5,000,000)

 

6(Design & Contingencies - $8,000,000)

 

7(23) SR 0145, Highway Restoration,
8Intersection of PA 145 and SR 0329,
9Whitehall Township, Project ID 93139

 

10Project Allocation

383,000

11(Base Project Allocation - $383,000)

 

12(24) SR 0378, Highway Portion Bridge
13Rehabilitation, SR 0378 (Hill to Hill
14Bridge) over Railroad and City Street,
15City of Bethlehem, Project ID 93630

 

16Project Allocation

36,002,000

17(Base Project Allocation -
18$36,000,000)

 

19(Land Allocation - $1,000)

 

20(Design & Contingencies - $1,000)

 

21(25) SR 0022, Highway Portion Bridge
22Replacement, US 22 over Mickley Road,
23Whitehall Township, Project ID 93628

 

24Project Allocation

3,202,000

25(Base Project Allocation - $3,200,000)

 

26(Land Allocation - $1,000)

 

27(Design & Contingencies - $1,000)

 

28(26) SR 0309, Resurface, Route 873 to
29Schuylkill County Line, Heidelberg and
30Lynn Townships, Project ID 101847

 

1Project Allocation

4,150,000

2(Base Project Allocation - $4,100,000)

 

3(Design & Contingencies - $50,000)

 

4(27) SR 1002, Highway Resurface, SR 1002
5(Tilghman Street) from Front Street to
610th Street, City of Allentown,
7Project ID 101488

 

8Project Allocation

300,000

9(Design & Contingencies - $300,000)

 

10(28) SR 0309, Interchange Improvements,
11SR 0309 Interchange with I-78, Center
12Valley, Project ID 102160

 

13Project Allocation

32,000,000

14(Base Project Allocation -
15$25,000,000)

 

16(Design & Contingencies - $7,000,000)

 

17(29) SR 0100, Reconstruction SR 0100 from
18Schantz Road to Tilghman Street, Upper
19Macungie Township, Project ID 102311

 

20Project Allocation

6,752,000

21(Base Project Allocation - $6,001,000)

 

22(Land Allocation - $100,000)

 

23(Design & Contingencies - $651,000)

 

24(30) SR 0378, Surface Treatment, SR 0378
25(Northbound and Southbound) Including
26Ramps (SR 8022, 8024, 8026) and SR
271001, City of Bethlehem, Project ID
28101957

 

29Project Allocation

1,302,000

30(Base Project Allocation - $1,251,000)

 

1(Design & Contingencies - $51,000)

 

2(31) SR 0309, Rehabilitation, Resurface,
3PA 309 from Walbert Avenue to
4Shankweiler Road, North Whitehall and
5South Whitehall Townships, Project ID
6102312

 

7Project Allocation

16,451,000

8(Base Project Allocation -
9$10,000,000)

 

10(Land Allocation - $5,200,000)

 

11(Design & Contingencies - $1,251,000)

 

12(32) I-78, Reconstruction, I-78 from
13Berks County Line to Northampton
14County Line, Various Municipalities,
15Project ID 0

 

16Project Allocation

77,000,000

17(Base Project Allocation -
18$77,000,000)

 

19(33) US 222 Bypass, Safety and Congestion
20Improvements, SR 0222 Bypass near
21Proposed Hamilton Crossings
22Development, Lower Macungie Township,
23Project ID 0

 

24Project Allocation

6,500,000

25(Base Project Allocation - $6,500,000)

 

26(34) SR 0145, Multimodal Corridor Study,
276th, 7th and 8th Streets, City of
28Allentown, Project ID 99697

 

29Project Allocation

100,000

30(Base Project Allocation - $100,000)

 

1(35) SR 0222, Highway Resurface, SR 0222
2Bypass from SR 0100 to I-78, South
3Whitehall, Lower Macungie and Upper
4Macungie Townships, Project ID 101489

 

5Project Allocation

3,400,000

6(Base Project Allocation - $3,300,000)

 

7(Design & Contingencies - $100,000)

 

8(36) Various, Guiderail Improvements,
9Various Locations, Various
10Municipalities in Lehigh and
11Northampton Counties, Project ID 89233

 

12Project Allocation

300,000

13(Base Project Allocation - $300,000)

 

14Section 340. Luzerne County.

15Projects are as follows:

 

16(1) (Reserved).

 

17(2) SR 3007, Construct New Park and Ride
18Lot, SR 3007 at Exit 155 off I-81,
19Dorrance Township, Project ID 50703

 

20Project Allocation

370,000

21(Base Project Allocation - $370,000)

 

22(3) SR 4020, Highway Portion Bridge
23Replacement, SR 4020 (Volanski Road)
24over Pine Creek, Huntington Township,
25Project ID 93019

 

26Project Allocation

2,669,000

27(Base Project Allocation - $1,930,000)

 

28(Design and Contingencies - $739,000)

 

29(4) SR 3010, Highway Portion Bridge
30Rehabilitation, SR 3010 (Alberdeen

 

1Road) over Branch of Wapwallopen
2Creek, Dorrance Township, Project ID
393036

 

4Project Allocation

3,539,000

5(Base Project Allocation - $2,816,000)

 

6(Design & Contingencies - $723,000)

 

7(5) SR 2036, Highway Portion Bridge
8Replacement, SR 2036 (Bald Mountain
9Road) over Mill Creek, Bear Creek
10Township, Project ID 93033

 

11Project Allocation

3,764,000

12(Base Project Allocation - $3,036,000)

 

13(Design & Contingencies - $728,000)

 

14(6) SR 0118, Safety and Intersection
15Improvements, Segments 0118/0320
16through 0118/0330, Lehman Township,
17Project ID 92444

 

18Project Allocation

1,125,000

19(Base Project Allocation - $1,000,000)

 

20(Land Allocation - $125,000)

 

21(7) SR 0309, Union Street, Park and Ride,
22Intersection of SR 0309 and Union
23Street, Pringle and Luzerne Boroughs,
24Project ID 93038

 

25Project Allocation

2,145,000

26(Base Project Allocation - $1,600,000)

 

27(Land Allocation - $45,000)

 

28(Design & Contingencies - $500,000)

 

29(8) SR 1012, Slope Repair, SR 1012 (Chase
30Road), Jackson Township, Project ID

 

196931

 

2Project Allocation

665,000

3(Base Project Allocation - $475,000)

 

4(Design & Contingencies - $190,000)

 

5(9) SR 0081, Safety Improvement, Ramp
6Improvements, I-81 Ramp Improvements,
7Hanover and Wilkes-Barre Townships,
8Project ID 83451

 

9Project Allocation

777,000

10(Base Project Allocation - $500,000)

 

11(Land Allocation - $177,000)

 

12(Design & Contingencies - $100,000)

 

13(10) SR 2015, Highway Portion Bridge
14Replacement, SR 2015 (Market Street)
15over Gardner Creek, Laflin Borough,
16Project ID 93022

 

17Project Allocation

886,000

18(Base Project Allocation - $668,000)

 

19(Design & Contingencies - $218,000)

 

20(11) SR 3021, Highway Portion Bridge
21Rehabilitation, SR 3021 (Old Turnpike
22Road) over Nescopeck Creek, Butler
23Township, Project ID 93039

 

24Project Allocation

11,604,000

25(Base Project Allocation -
26$10,825,000)

 

27(Design & Contingencies - $779,000)

 

28(12) SR 3006, Highway Restoration, SR
293006 (Lily Lake Road) over Pond Creek,
30Conyngham Township, Project ID 93035

 

1Project Allocation

2,867,000

2(Base Project Allocation - $2,161,000)

 

3(Design & Contingencies - $706,000)

 

4(13) SR 0118, Intersection Improvements,
5SR 0118 at Idetown Road, Lehman
6Township, Project ID 84565

 

7Project Allocation

309,000

8(Base Project Allocation - $192,000)

 

9(Land Allocation - $25,000)

 

10(Design & Contingencies - $92,000)

 

11(14) SR 3034, Highway Portion Bridge
12Replacement, SR 3034 (Sugarloaf
13Avenue), Conyngham Borough, Project ID
1493040

 

15Project Allocation

4,560,000

16(Base Project Allocation - $3,271,000)

 

17(Land Allocation - $111,000)

 

18(Design & Contingencies - $1,178,000)

 

19(15) SR 4026, Highway Portion Bridge
20Replacement, SR 4026 over Lewis Run,
21Hunlock Township, Project ID 89703

 

22Project Allocation

863,000

23(Base Project Allocation - $863,000)

 

24(16) SR 2017, Highway Portion Bridge
25Replacement, SR 2017 (Yatesville Road)
26over SR 2021 (James A. Musto Bypass),
27Jenkins Township, Project ID 93025

 

28Project Allocation

1,664,000

29(Base Project Allocation - $1,484,000)

 

30(Design & Contingencies - $180,000)

 

1(17) SR 2019, Highway Portion Bridge
2Replacement, SR 2019 (Oak Street),
3Pittston Township, Project ID 69001

 

4Project Allocation

2,469,000

5(Base Project Allocation - $2,337,000)

 

6(Land Allocation - $9,000)

 

7(Design & Contingencies - $123,000)

 

8(18) SR 2035, Highway Portion Bridge
9Replacement, SR 2035 (Bear Creek Road)
10over Mud Run Creek, Jenkins Township,
11Project ID 93032

 

12Project Allocation

3,764,000

13(Base Project Allocation - $3,036,000)

 

14(Design & Contingencies - $728,000)

 

15(19) SR 1040, Slope Repair, SR 1040
16(Apple Tree Road), Exeter Township,
17Project ID 96794

 

18Project Allocation

1,070,000

19(Base Project Allocation - $662,000)

 

20(Design & Contingencies - $408,000)

 

21(20) SR 1025, Slope Repair, SR 1025
22(Schooley Avenue), Exeter Borough,
23Project ID 96795

 

24Project Allocation

894,000

25(Base Project Allocation - $596,000)

 

26(Design & Contingencies - $298,000)

 

27(21) SR 1021, Slope Repair, SR 1021
28(Eighth Street), Kingston Township,
29West Wyoming Borough, Project ID 96799

 

30Project Allocation

357,000

1(Base Project Allocation - $265,000)

 

2(Design & Contingencies - $92,000)

 

3(22) SR 2035, Highway Portion Bridge
4Rehabilitation, SR 2035 (Bear Creek
5Road), Bear Creek Township, Project ID
693027

 

7Project Allocation

3,357,000

8(Base Project Allocation - $2,572,000)

 

9(Design & Contingencies - $785,000)

 

10(23) SR 0029, Highway Portion Bridge
11Preservation, PA 29 (South Cross
12Valley Expressway) over New Commerce
13Boulevard, Hanover Township, Project
14ID 69228

 

15Project Allocation

2,914,000

16(Base Project Allocation - $2,173,000)

 

17(Land Allocation - $50,000)

 

18(Design & Contingencies - $691,000)

 

19(24) SR 1001, Slide Repair, SR 1001
20(Washington Street), Larksville
21Borough, Project ID 96800

 

22Project Allocation

357,000

23(Base Project Allocation - $265,000)

 

24(Design & Contingencies - $92,000)

 

25(25) SR 1021, Highway Portion Bridge
26Replacement, SR 1021 (Eighth Street)
27over Sutton Creek, Franklin Township,
28Project ID 93020

 

29Project Allocation

4,211,000

30(Base Project Allocation - $3,476,000)

 

1(Design & Contingencies - $735,000)

 

2(26) SR 0309 and SR 0093, Corridor Safety
3Improvement, SR 0309 and SR 0093
4Connector, Hazle Township, Project ID
574756

 

6Project Allocation

325,000

7(Base Project Allocation - $325,000)

 

8(27) SR 0309, Congestion Improvement –
9Park and Ride, SR 0309 Corridor,
10Butler Township, Project ID 64481

 

11Project Allocation

3,200,000

12(Base Project Allocation - $3,000,000)

 

13(Design & Contingencies - $200,000)

 

14(28) Coal Street, Highway Reconstruction,
15Wilkes-Barre Boulevard to Union
16Street, City of Wilkes-Barre, Project
17ID 80028

 

18Project Allocation

4,001,000

19(Base Project Allocation - $3,352,000)

 

20(Land Allocation - $300,000)

 

21(Design & Contingencies - $349,000)

 

22(29) SR 0080, Restoration, SR 0080
23Eastbound and Westbound, Black Creek,
24Butler, Nescopeck and Sugarloaf
25Townships, Project ID 91598

 

26Project Allocation

1,641,000

27(Base Project Allocation - $1,541,000)

 

28(Design & Contingencies - $100,000)

 

29(30) SR 0092, Highway Surface Treatment,
30SR 0092 from SR 0292 to SR 0011,

 

1Conynghman Township, Exeter Borough,
2Exeter and Huntington Townships,
3Shickshinny Borough, Union Township,
4West Pittston Borough, Project ID
591214

 

6Project Allocation

7,213,000

7(Base Project Allocation - $7,212,000)

 

8(Design & Contingencies - $1,000)

 

9(31) SR 0029, Install ITS Devices, I-81,
10SR 0115 and SR 0029, Hanover, Jenkins
11and Plains Townships, Project ID 85456

 

12Project Allocation

399,000

13(Base Project Allocation - $160,000)

 

14(Design & Contingencies - $239,000)

 

15(32) SR 2002, Surface Treatment, SR 2002,
16Hanover Township, Project ID 93945

 

17Project Allocation

5,501,000

18(Base Project Allocation - $5,500,000)

 

19(Design & Contingencies - $1,000)

 

20(33) I-80, Restoration, Overlay Existing
21Concrete, I-80 Eastbound and
22Westbound, Approximately 2 Miles East
23of I-81, Butler, Dennison and Foster
24Townships, White Haven Borough,
25Project ID 94465

 

26Project Allocation

11,900,000

27(Base Project Allocation -
28$11,000,000)

 

29(Design & Contingencies - $900,000)

 

30(34) SR 0081, Lengthening of I-81

 

1Southbound Off Ramp Exit 165, 0.2 Mile
2North Exit 165, Wilkes-Barre Township,
3Project ID 85008

 

4Project Allocation

656,000

5(Base Project Allocation - $651,000)

 

6(Land Allocation - $5,000)

 

7(35) SR 0309, Bridge Preservation
8Activities, SR 0309 over SR 1013
9Luzerne Borough, Project ID 92884

 

10Project Allocation

3,809,000

11(Base Project Allocation - $3,808,000)

 

12(Design & Contingencies - $1,000)

 

13(36) SR 0309, Highway Portion Bridge
14Preservation, SR 0309 (North Cross
15Valley) over SR 2004 (River Street),
16L&S Railroad and the Susquehanna
17River, Forty Fort Borough, City of
18Wilkes-Barre, Project ID 89012

 

19Project Allocation

564,000

20(Base Project Allocation - $564,000)

 

21(37) SR 0118, Horizontal and Vertical
22Intersections Improvements, SR 0118
23Intersection at Segments 0210, 0220,
240320 and 0330, Lake, Lehman and Ross
25Townships, Project ID 85466

 

26Project Allocation

266,000

27(Base Project Allocation - $184,000)

 

28(Land Allocation - $24,000)

 

29(Design & Contingencies - $58,000)

 

30(38) SR 0940, Congestion Improvement –

 

1Park and Ride, SR 0940 Corridor, White
2Haven Borough, Project ID 70235

 

3Project Allocation

2,200,000

4(Base Project Allocation - $2,000,000)

 

5(Design & Contingencies - $200,000)

 

6(39) SR 4016, Highway Portion Bridge
7Replacement, SR 4016 (Hunlock-
8Harveyville Road) over Branch of
9Shickshinny Creek, Union Township,
10Project ID 93041

 

11Project Allocation

2,688,000

12(Base Project Allocation - $1,921,000)

 

13(Design & Contingencies - $767,000)

 

14(40) SR 8005, Highway Portion Bridge
15Replacement, Route 8005 (Ramp E) over
16I-80, Butler Township, Project ID
1797506

 

18Project Allocation

296,000

19(Base Project Allocation - $141,000)

 

20(Design & Contingencies - $155,000)

 

21(41) SR 1006, Highway Portion Bridge
22Preservation, SR 1006 over SR 0309,
23Forty Fort Borough, Project ID 92882

 

24Project Allocation

1,886,000

25(Base Project Allocation - $1,723,000)

 

26(Land Allocation - $1,000)

 

27(Design & Contingencies - $162,000)

 

28(42) SR 4024, Highway Portion Bridge
29Rehabilitation, SR 4024 (Talcott Hill
30Road) over Huntington Creek, Fairmount

 

1Township, Project ID 93043

 

2Project Allocation

1,078,000

3(Base Project Allocation - $390,000)

 

4(Design & Contingencies - $688,000)

 

5(43) SR 4026, Highway Portion Bridge
6Replacement, SR 4026 (Prichards Road)
7over Lewis Run, Hunlock Township,
8Project ID 93044

 

9Project Allocation

2,696,000

10(Base Project Allocation - $1,917,000)

 

11(Design & Contingencies - $779,000)

 

12(44) SR 0081, Interchange Improvements,
13I-81 and SR 0924 Interchange, Hazle
14Township, Project ID 86733

 

15Project Allocation

3,043,000

16(Base Project Allocation - $2,640,000)

 

17(Design & Contingencies - $403,000)

 

18(45) SR 0309, Surface Treatment, Various
19Segments of SR 0309 and SR 0415,
20Various Municipalities, Project ID
2199523

 

22Project Allocation

5,144,000

23(Base Project Allocation - $5,143,000)

 

24(Design & Contingencies - $1,000)

 

25(46) SR 2006, Resurface, Wyoming Avenue
26to Lackawanna County Line, Duryea
27Borough, Cities of Pittston and
28Wilkes-Barre, Butler, Dorrance and
29Wright Townships, Project ID 102354

 

30Project Allocation

951,000

1(Base Project Allocation - $951,000)

 

2(47) SR 0118, Restoration, Surface
3Treatment, SR 0118 from Ricketts Glen
4Entrance Road to SR 0415 (Memorial
5Highway), Dallas, Fairmount, Lake,
6Lehman and Ross Townships, Project ID
7102113

 

8Project Allocation

7,097,000

9(Base Project Allocation - $7,096,000)

 

10(Design & Contingencies - $1,000)

 

11(48) SR 1032, Restoration, Surface
12Treatment, SR 1032, SR 3022, SR 1057,
13SR 0309, SR 2415, in the Corresponding
14Municipalities, Bear Creek and Butler
15Townships, Dallas Borough, Dallas
16Township, Harveys Lake Borough, Lake
17and Lehman Townships, Project ID
18101988

 

19Project Allocation

6,200,000

20(Base Project Allocation - $6,199,000)

 

21(Design & Contingencies - $1,000)

 

22(49) SR 0115, Edgeline Rumble Strips, PA
23115 and PA 239, Bear Creek Township,
24Bear Creek Village Borough, Buck and
25Huntington Townships, Shickshinny
26Borough, Union Township, Project ID
27102002

 

28Project Allocation

5,320,000

29(Base Project Allocation - $4,917,000)

 

30(Design & Contingencies - $403,000)

 

1(50) I-81, Reconstruction, I-81 from
2South of Interchange with SR 0029 to
3the Lackawanna County Line, Ashley,
4Avoca, Dupont and Duryea Boroughs,
5Hanover, Hazle and Jenkins Townships,
6Laflin Borough, Newport, Pittston,
7Plains and Wilkes-Barre Townships,
8Project ID 98248

 

9Project Allocation

367,350,000

10(Base Project Allocation -
11$360,000,000)

 

12(Land Allocation - $150,000)

 

13(Design & Contingencies - $7,200,000)

 

14(51) I-81, Resurface, I-81 from
15Schuylkill County to Exit 145, and
16from Exit 164 to Exit 175, Dupont,
17Pittston, Hanover, Newport, Plains,
18Wilkes-Barre, Hazle and Jenkins
19Townships, Ashley, Dupont, Laflin,
20Pittston and West Hazleton Boroughs,
21Project ID 98247

 

22Project Allocation

13,000,000

23(Base Project Allocation -
24$13,000,000)

 

25(52) SR 0115, Various, Restoration,
26Surface Treatment, SR 0115, SR 1031,
27SR 3004, SR 2048 in the Corresponding
28Municipalities, Bear Creek, Conyngham,
29Exeter, Foster, Kingston, Newport and
30Plains Townships, White Haven Borough,

 

1Project ID 102068

 

2Project Allocation

6,661,000

3(Base Project Allocation - $6,660,000)

 

4(Design & Contingencies - $1,000)

 

5(53) SR 4035, Highway Portion of Bridge
6Rehabilitation, Huntington Creek, SR
74035, Huntington Township, Project ID
8101925

 

9Project Allocation

1,209,000

10(Base Project Allocation - $518,000)

 

11(Design & Contingencies - $691,000)

 

12(54) SR 0115, Pipe Replacement, PA 115
13(Bear Creek Boulevard), Bear Creek
14Township, Project ID 101479

 

15Project Allocation

2,651,000

16(Base Project Allocation - $1,961,000)

 

17(Design & Contingencies - $690,000)

 

18(55) SR 0011, Resurface, SR 2006 to Main
19Street, Duryea Borough, Pittston and
20City of Wilkes-Barre, Butler, Dorrance
21and Wright Townships, Project ID
22102354

 

23Project Allocation

450,000

24(Base Project Allocation - $450,000)

 

25(56) SR 2002, Reconstruction,
26Restoration, SR 2002 from Loomis
27Street to SR 2005, Hanover Township,
28City of Nanticoke, Project ID 102030

 

29Project Allocation

27,030,000

30(Base Project Allocation -

 

1$26,290,000)

 

2(Land Allocation - $50,000)

 

3(Design & Contingencies - $690,000)

 

4(57) SR 0309, Park and Ride Lot, SR 0309
5Park and Ride, Luzerne Borough,
6Project ID 102217

 

7Project Allocation

5,501,000

8(Base Project Allocation - $5,500,000)

 

9(Design & Contingencies - $1,000)

 

10(58) SR 2004, Resurface, SR 2004, Horton
11Street to River Street, Duryea
12Borough, Cities of Pittston and
13Wilkes-Barre, Butler, Dorrance and
14Wright Townships, Project ID 102354

 

15Project Allocation

291,000

16(Base Project Allocation - $291,000)

 

17(59) SR 8035, Various, Restoration,
18Surface Treatment, SR 1001, SR 8035,
19SR 8045, SR 8047, SR 8039, SR 1002, SR
208013, SR 8019, SR 8037, SR 1027, SR
211037, SR 1026, SR 1038, SR 2057 in the
22Corresponding Municipalities, Ashley
23and Avoca Boroughs, Dallas Township,
24Dupont and Exeter Boroughs, Exeter,
25Foster, Franklin and Hanover
26Townships, Larksville and Luzerne
27Boroughs, Pittston and Plains
28Townships, Plymouth and Pringle
29Boroughs, Project ID 102013

 

30Project Allocation

6,119,000

1(Base Project Allocation - $6,118,000)

 

2(Design & Contingencies - $1,000)

 

3(60) SR 2006, Various, Restoration,
4Surface Treatment, SR 2006, SR 4025,
5SR 4027, SR 4035, SR 4009, SR 1028, SR
60309, in the Corresponding
7Municipalities, Ashley and Duryea
8Boroughs, Fairview and Hanover
9Townships, Harveys Lake Borough,
10Hunlock, Huntington and Lake
11Townships, City of Pittston, Ross and
12Union Townships, Project ID 102062

 

13Project Allocation

6,192,000

14(Base Project Allocation - $6,191,000)

 

15(Design & Contingencies - $1,000)

 

16(61) I-80, Reconstruction, I-80 from the
17Columbia County Line to the Carbon
18County Line, Various Municipalities,
19Project ID 0

 

20Project Allocation

102,000,000

21(Base Project Allocation -
22$102,000,000)

 

23(62) SR 0011, Restoration, Surface
24Treatment, SR 0011 from SR 1019
25(Dennison Street) to the Lackawanna
26County Line, Avoca, Dupont, Duryea,
27Exeter, Forty Fort and Hughestown
28Townships, City of Pittston, Pittston
29Township, West Pittston and Wyoming
30Boroughs, Project ID 102095

 

1Project Allocation

4,976,000

2(Base Project Allocation - $4,975,000)

 

3(Design & Contingencies - $1,000)

 

4(63) SR 0118, SR 0029, Restoration,
5Surface Treatment, SR 0118 from SR
64028 (Mooretown Road) to Bridge over
7Fades Creek, SR 0029 from SR 0011 to
8TR 497 (Pavlick Road), Jackson, Lake,
9Plymouth and Ross Townships, Project
10ID 102088

 

11Project Allocation

3,776,000

12(Base Project Allocation - $3,775,000)

 

13(Design & Contingencies - $1,000)

 

14(64) SR 0093, Restoration, Surface
15Treatment, SR 0093 Corridor Main
16Street, Broad Street, Susquehanna
17Avenue, Berwick-Hazleton Highway,
18Third Street, Hazle Township, City of
19Hazleton, Hollenback Township,
20Nescopeck Borough, Nescopeck and
21Sugarloaf Townships, West Hazleton
22Borough, Project ID 102091

 

23Project Allocation

9,757,000

24(Base Project Allocation - $9,756,000)

 

25(Design & Contingencies - $1,000)

 

26(65) SR 2015, Intersection Improvements,
27SR 2015 (Saylor Avenue) and SR 2004
28(River Road), Plains Township, Project
29ID 102007

 

30Project Allocation

2,423,000

1(Base Project Allocation - $1,681,000)

 

2(Land Allocation - $51,000)

 

3(Design & Contingencies - $691,000)

 

4(66) SR 0011, Restoration, Surface
5Treatment, SR 0011, from the Columbia
6County Line to On Ramp for SR 0029,
7Hunlock, Plymouth and Salem Townships,
8Shickshinny Borough, Union Township,
9Project ID 102093

 

10Project Allocation

11,278,000

11(Base Project Allocation -
12$11,277,000)

 

13(Design & Contingencies - $1,000)

 

14(67) SR 0487, Various, Restoration,
15Surface Treatment, SR 0487, SR 4011,
16SR 1034, SR 1055, SR 1063, SR 1041, in
17Corresponding Municipalities, Dallas
18and Fairmount Townships, Harveys Lake
19Borough, Huntington and Lake
20Townships, Project ID 102005

 

21Project Allocation

6,096,000

22(Base Project Allocation - $6,095,000)

 

23(Design & Contingencies - $1,000)

 

24(68) SR 2028, Restoration, Surface
25Treatment, SR 2028, SR 3017, SR 1011,
26SR 2015, SR 0029, SR 0118, in the
27Corresponding Municipalities, Hanover
28Township, City of Hazleton, Jenkins
29Township, Kingston and Laflin
30Boroughs, Lehman, Pittston, Plains,

 

1and Plymouth Townships, Sugar Notch
2Borough, City of Wilkes-Barre,
3Yatesville Borough, Project ID 102073

 

4Project Allocation

6,529,000

5(Base Project Allocation - $6,528,000)

 

6(Design & Contingencies - $1,000)

 

7(69) SR 2005, Reconstruction,
8Restoration, SR 2005 (Blackman Street)
9in the Corresponding Municipalities,
10Hanover Township, City of Wilkes-
11Barre, Wilkes-Barre Township, Project
12ID 102116

 

13Project Allocation

7,003,000

14(Base Project Allocation - $6,600,000)

 

15(Design & Contingencies - $403,000)

 

16(70) I-81, Cable Median Barrier, Along I-
1781, Various Municipalities, Project ID
18102001

 

19Project Allocation

1,740,000

20(Base Project Allocation - $1,337,000)

 

21(Design & Contingencies - $403,000)

 

22(71) I-81, Reconstruction, I-81 from
23Schuylkill County Line to Lackawanna
24County Line, Various Municipalities,
25Project ID 0

 

26Project Allocation

156,400,000

27(Base Project Allocation -
28$156,400,000)

 

29(72) SR 2017, Intersection Improvement,
30SR 0315 (Dupont Highway) and SR 2017

 

1(Yatesville Road), Jenkins Township,
2Project ID 102011

 

3Project Allocation

4,100,000

4(Base Project Allocation - $3,360,000)

 

5(Land Allocation - $50,000)

 

6(Design & Contingencies - $690,000)

 

7(73) SR 0309, Resurface, Woodmere Drive
8to Sunset Drive, Duryea Borough, City
9of Pittston, City of Wilkes-Barre,
10Butler, Dorrance and Wright Townships,
11Project ID 102354

 

12Project Allocation

2,957,000

13(Base Project Allocation – 2,957,000)

 

14(74) Various, Restoration, Surface
15Treatment, SR 0940 from Power House
16Road to I-81, SR 3001 from Blue Ridge
17Road to the West Nanticoke Bridge, SR
183034 from T-419 to Butler Avenue, SR
192001 from SR 2010 to SR 2002, SR 0029
20from SR 0118 to the Wyoming County
21Line, SR 2004 from SR 1011 to Swallow
22Street, SR 2006 from SR 3028 to SR
232003, Ashley, Conyngham and Duryea
24Boroughs, Hanover and Lake Townships,
25City of Nanticoke, Newport Township,
26City of Pittston, Slocum Township,
27White Haven Borough, City of Wilkes-
28Barre, Project ID 91213

 

29Project Allocation

7,128,000

30(Base Project Allocation – 7,128,000)

 

1(75) Various, Rehabilitation, Resurface,
2SR 0011, SR 3010, SR 3012, SR 3015, SR
33017, SR 3019, SR 3024 Corridors,
4Avoca, Duryea, Hughestown and Laflin
5Boroughs, City of Pittston, Pittston
6Township, Project ID 97220

 

7Project Allocation

500,000

8(Base Project Allocation - $500,000)

 

9(76) Various, Restoration, Surface
10Treatment, SR 2019, SR 1006, SR 2004,
11SR 0239, SR 2026, SR 8001, SR 8002, SR
128003, SR 8005, SR 2037 and SR 1010, in
13the Corresponding Municipalities,
14Butler Township, Exeter and Forty Fort
15Boroughs, Hazle Township, Kingston and
16Laflin Boroughs, Nescopeck Township,
17City of Pittston, Pittston, Plains and
18Sugarloaf Townships, West Hazleton
19Borough, City of Wilkes-Barre, Project
20ID 101928

 

21Project Allocation

6,283,000

22(Base Project Allocation - $6,282,000)

 

23(Design & Contingencies - $1,000)

 

24Section 341. Lycoming County.

25Projects are as follows:

 

26(1) (Reserved).

 

27(2) SR 0414, Highway Portion Bridge Truss
28Rehabilitation, SR 0414 over Pine
29Creek, Brown Township, Project ID 6206

 

30Project Allocation

242,000

1(Base Project Allocation - $196,000)

 

2(Design and Contingencies - $46,000)

 

3(3) SR 0015, Reconstruct Roadway,
4Intersection of US 15 and 4 Mile Road,
5Lewis Township, Project ID 93024

 

6Project Allocation

1,466,000

7(Base Project Allocation - $1,041,000)

 

8(Land Allocation - $225,000)

 

9(Design and Contingencies - $200,000)

 

10(4) SR 0180, Resurface, I-180 from
11Loyalsock Creek to Turkey Run,
12Fairfield Township, Montoursville
13Borough, Muncy Township, Project ID
1482310

 

15Project Allocation

246,000

16(Base Project Allocation - $240,000)

 

17(Design & Contingencies - $6,000)

 

18(5) SR 0220, Install New Overhead Sign
19Structure, SR 0220 Main Street and SR
200044 Interchange, Segment/Offset
210061/1900, Piatt Township, Project ID
2287006

 

23Project Allocation

271,000

24(Base Project Allocation - $262,000)

 

25(Design & Contingencies - $9,000)

 

26(6) SR 0014, Resurface, PA 14 from
27Pleasant Stream Road to Red Run,
28McIntyre Township, Project ID 97774

 

29Project Allocation

304,000

30(Base Project Allocation - $304,000)

 

1(7) SR 8006, Replace Existing Overhead
2Sign Structure, SR 0180 Hepburn Street
3Off-Ramp, Segment/Offset 0010/0530,
4City of Williamsport, Project ID 87002

 

5Project Allocation

309,000

6(Base Project Allocation - $299,000)

 

7(Design & Contingencies - $10,000)

 

8(8) SR 2014, Reconstruct Roadway, SR 2014
9from Hillside Avenue to US 15,
10Segments 0060/0000 to 0070/2210, City
11of Williamsport, Project ID 87986

 

12Project Allocation

1,061,000

13(Land Allocation - $251,000)

 

14(Design & Contingencies - $810,000)

 

15(9) SR 0044, Resurface, PA 44 from Ramsey
16Run to SR 4001 (Little Pine Creek
17Road), Cummings Township, Project ID
1897776

 

19Project Allocation

349,000

20(Base Project Allocation - $349,000)

 

21(10) SR 0118, Highway Portion Bridge
22Rehabilitation, PA 118 over Little
23Muncy Creek, Jordan Township, Project
24ID 97658

 

25Project Allocation

421,000

26(Base Project Allocation - $321,000)

 

27(Design & Contingencies - $100,000)

 

28(11) SR 2014, Reconstruct Roadway, SR
292014 from Campbell Street to Basin
30Street, Segments 0120/0000 to

 

10160/0811, City of Williamsport,
2Project ID 87987

 

3Project Allocation

802,000

4(Land Allocation - $101,000)

 

5(Design & Contingencies - $701,000)

 

6(12) SR 0287, SR 0187, Intersection and
7Bridge Improvements, SR 0287
8Intersection SR 0187, Cogan House
9Township, Project ID 96791

 

10Project Allocation

267,000

11(Base Project Allocation - $250,000)

 

12(Land Allocation - $17,000)

 

13(13) SR 0180, Resurface, I-180 Eastbound
14from Cemetery Road to SR 2014,
15Fairfield, Muncy Creek and Muncy
16Townships, Project ID 97671

 

17Project Allocation

3,226,000

18(Base Project Allocation - $3,201,000)

 

19(Design & Contingencies - $25,000)

 

20(14) SR 0405, Resurface, PA 405 from
21Brick Church Road to Susquehanna
22River, Clinton Township, Project ID
2397785

 

24Project Allocation

267,000

25(Base Project Allocation - $267,000)

 

26(15) SR 0405, Highway Portion Bridge
27Rehabilitation, PA 405 over Tributary
28of Susquehanna River, Clinton
29Township, Project ID 97661

 

30Project Allocation

771,000

1(Base Project Allocation - $500,000)

 

2(Design & Contingencies - $271,000)

 

3(16) SR 2055, Resurface, SR 2055 from SR
42042 (East Lime Bluff Road) to SR 2053
5(Beacon Light Road), Muncy Creek and
6Muncy Townships, Project ID 97801

 

7Project Allocation

136,000

8(Base Project Allocation - $136,000)

 

9(17) SR 0118, Highway Portion Bridge
10Rehabilitation, PA 118 over Sugar Run,
11Wolf Township, Project ID 97654

 

12Project Allocation

771,000

13(Base Project Allocation - $500,000)

 

14(Design & Contingencies - $271,000)

 

15(18) SR 0054, Resurface, PA 54 from
16Brouse Road to Main Street, Clinton
17Township, Montgomery Borough, Project
18ID 97777

 

19Project Allocation

101,000

20(Base Project Allocation - $101,000)

 

21(19) SR 2053, Highway Portion Bridge
22Rehabilitation, SR 2053 over Wolf Run,
23Muncy Township, Project ID 97662

 

24Project Allocation

1,121,000

25(Base Project Allocation - $901,000)

 

26(Design & Contingencies - $220,000)

 

27(20) SR 2018, Resurface, SR 2018 from SR
282029 (Northway Road) to SR 2039
29(Warrensville Road), Loyalsock
30Township, Project ID 97797

 

1Project Allocation

196,000

2(Base Project Allocation - $196,000)

 

3(21) SR 2014, Reconstruction, SR 2014
4(Fourth Street) from US 15 to Campbell
5Street, Segments 0070/2210 to
60120/0000, City of Williamsport,
7Project ID 97508

 

8Project Allocation

5,021,000

9(Base Project Allocation - $4,601,000)

 

10(Land Allocation - $220,000)

 

11(Design & Contingencies - $200,000)

 

12(22) SR 0287, Highway Portion Bridge
13Replacement, PA 287 over Larry's
14Creek, Cummings Township, Project ID
1597625

 

16Project Allocation

1,721,000

17(Base Project Allocation - $1,300,000)

 

18(Design & Contingencies - $421,000)

 

19(23) SR 2027, Resurface, SR 2027 from SR
202018 (Four Mile Drive) to SR 2024
21(Northway Road Extension), Loyalsock
22Township, City of Williamsport,
23Project ID 97799

 

24Project Allocation

254,000

25(Base Project Allocation - $254,000)

 

26(24) SR 0180, Crack Seal and Plug Joints,
27Hepburn Street to Faxon, Segments
280310/0000 to 0370/0000, 0311/0000 to
290371/0096, Loyalsock Township, City of
30Williamsport, Project ID 95772

 

1Project Allocation

296,000

2(Base Project Allocation - $276,000)

 

3(Design & Contingencies - $20,000)

 

4(25) SR 0180, Resurface, I-180 Westbound
5from SR 2049 (Lycoming Mall Drive) to
6SR 2014, Fairfield, Muncy Creek and
7Muncy Townships, Project ID 97672

 

8Project Allocation

2,926,000

9(Base Project Allocation - $2,900,000)

 

10(Design & Contingencies - $26,000)

 

11(26) SR 0864, Resurface, PA 864 from PA
1287 to Mill Creek, Upper Fairfield
13Township, Project ID 97789

 

14Project Allocation

285,000

15(Base Project Allocation - $285,000)

 

16(27) SR 0180, Phase B Devices, I-180/US
1715/US 220 Interchange Area, City of
18Williamsport, Project ID 95185

 

19Project Allocation

760,000

20(Base Project Allocation - $351,000)

 

21(Land Allocation - $17,000)

 

22(Design & Contingencies - $392,000)

 

23(28) SR 2014, Safety Improvement,
24Intersection of SR 2014, SR 2036 and
25Legion Road, Muncy Township, Project
26ID 97607

 

27Project Allocation

1,060,000

28(Base Project Allocation - $1,060,000)

 

29(29) SR 0220, Resurface, US 220 from SR
302036 to Achmuty Road, Segments

 

10320/0000 to 0380/0000, Muncy
2Township, Project ID 92849

 

3Project Allocation

1,010,000

4(Base Project Allocation - $1,000,000)

 

5(Design & Contingencies - $10,000)

 

6(30) SR 0015, Mill and Resurface, SR 0015
7from the Union County Line to Route
854, SR 0015 Segments 0010/0000 to
90080/3340 and Segments 0041/0000 to
100041/0460, Brady and Clinton
11Townships, Project ID 87953

 

12Project Allocation

2,393,000

13(Base Project Allocation - $2,369,000)

 

14(Design & Contingencies - $24,000)

 

15(31) SR 0284, Highway Portion Bridge
16Replacement, PA 284 over Blacks Creek,
17Pine Township, Project ID 97623

 

18Project Allocation

1,746,000

19(Base Project Allocation - $1,400,000)

 

20(Design & Contingencies - $346,000)

 

21(32) SR 0015, Mill and Resurface, SR 0015
22from Route 284 to the Lycoming County
23Line, Segments 1770/0874 to 1860/2330,
24Segments 1771/0000 to 1861/2315,
25Jackson Township, Project ID 87969

 

26Project Allocation

5,998,000

27(Base Project Allocation - $5,982,000)

 

28(Design & Contingencies - $16,000)

 

29(33) SR 0044, Resurface, PA 44 from
30Rattling Camp Run to PA 654, Segments

 

10220/000 to 0260/0950, Limestone
2Township, Project ID 97698

 

3Project Allocation

587,000

4(Base Project Allocation - $566,000)

 

5(Design & Contingencies - $21,000)

 

6(34) SR 0220, Highway Portion Bridge
7Rehabilitation, US 220 over Lick Run,
8Shrewsbury Township, Project ID 97660

 

9Project Allocation

771,000

10(Base Project Allocation - $500,000)

 

11(Design & Contingencies - $271,000)

 

12(35) SR 2003, Highway Portion Bridge
13Replacement, SR 2003 over Spring
14Creek, Washington Township, Project ID
1597632

 

16Project Allocation

1,448,000

17(Base Project Allocation - $1,001,000)

 

18(Land Allocation - $146,000)

 

19(Design & Contingencies - $301,000)

 

20(36) SR 2018, Mill and Resurface Roadway,
21SR 2018 from Almond Street to Northway
22Road, Segments 0040/0035 to 0060/0678,
23Loyalsock Township, City of
24Williamsport, Project ID 87970

 

25Project Allocation

803,000

26(Base Project Allocation - $779,000)

 

27(Design & Contingencies - $24,000)

 

28(37) SR 0044, Highway Portion Bridge
29Rehabilitation, PA 44 over Ramsey Run,
30Cummings Township, Project ID 97609

 

1Project Allocation

1,136,000

2(Base Project Allocation - $791,000)

 

3(Design & Contingencies - $345,000)

 

4(38) SR 0284, Highway Portion Bridge
5Rehabilitation, PA 284 over Bonnell
6Run, Pine Township, Project ID 97617

 

7Project Allocation

901,000

8(Base Project Allocation - $801,000)

 

9(Design & Contingencies - $100,000)

 

10(39) SR 1017, Highway Portion Bridge
11Rehabilitation, SR 1017 (Lycoming
12Creek Road) over Lycoming Creek,
13Hepburn and Lewis Townships, Project
14ID 87917

 

15Project Allocation

860,000

16(Base Project Allocation - $845,000)

 

17(Land Allocation - $15,000)

 

18(40) SR 0087, Highway Portion Bridge
19Rehabilitation, PA 87 over Little Bear
20Creek, Plunketts Creek Township,
21Project ID 97615

 

22Project Allocation

1,021,000

23(Base Project Allocation - $921,000)

 

24(Design & Contingencies - $100,000)

 

25(41) SR 0220, Roadway Safety Improvement
26(Median Barrier), US 220 From Martins
27Road to Christians Road, Piatt
28Township, Project ID 82869

 

29Project Allocation

211,000

30(Base Project Allocation - $200,000)

 

1(Design & Contingencies - $11,000)

 

2(42) SR 0220, Roadway Intersection
3Improvement, Intersection of US 220
4and SR 0405, SR 0220 Segments
50420/0775 to 0430/1375 SR 0405
6Segments 0250/0000 to 0250/1862,
7Hughesville Borough, Wolf Township,
8Project ID 93016

 

9Project Allocation

4,453,000

10(Base Project Allocation - $2,751,000)

 

11(Land Allocation - $1,201,000)

 

12(Design & Contingencies - $501,000)

 

13(43) SR 4002, Highway Portion Bridge
14Replacement, SR 4002 over Trout Run,
15Pine Township, Project ID 97664

 

16Project Allocation

320,000

17(Base Project Allocation - $175,000)

 

18(Land Allocation - $75,000)

 

19(Design & Contingencies - $70,00)

 

20(44) SR 0220, Mill and Resurface Roadway,
21US 220 SR 0220 from Youngs Road to
22Stewart Street, Segments 0160/0000 to
230210/1638, Segments 0181/1852 to
240211/1625, Woodward Township, Project
25ID 87878

 

26Project Allocation

1,248,000

27(Base Project Allocation - $1,230,000)

 

28(Design & Contingencies - $18,000)

 

29(45) SR 0864, Highway Portion Bridge
30Rehabilitation, PA 864 over Mill

 

1Creek, Upper Fairfield Township,
2Project ID 97620

 

3Project Allocation

1,067,000

4(Base Project Allocation - $966,000)

 

5(Design & Contingencies - $101,000)

 

6(46) SR 4001, Highway Restoration, SR
74001 (Little Pine Creek Road) over
8Little Pine Creek, Pine Township,
9Project ID 88743

 

10Project Allocation

1,194,000

11(Base Project Allocation - $1,194,000)

 

12(47) SR 0405, Resurface, PA 405 from
13Muncy Creek to Hughesville,
14Hughesville Borough, Muncy Creek and
15Wolf Townships, Project ID 97702

 

16Project Allocation

836,000

17(Base Project Allocation - $816,000)

 

18(Design & Contingencies - $20,000)

 

19(48) SR 2056, Resurface, SR 2056 from SR
202029 (Northway Road) to SR 2016
21(Washington Boulevard), Loyalsock
22Township, Project ID 97803

 

23Project Allocation

74,000

24(Base Project Allocation - $58,000)

 

25(Design & Contingencies - $16,000)

 

26(49) SR 0414, Slide Correction, SR 0414 
27Cedar Run Narrows, Brown Township, 
28Project ID 98089

 

29Project Allocation

2,600,000

30(Base Project Allocation - $2,500,000)

 

1(Land Allocation - $50,000)

 

2(Design & Contingencies - $50,000)

 

3(50) SR 3003, Resurface, SR 3003 from
4Nelson Street to PA 44, Jersey Shore
5Borough, Project ID 97704

 

6Project Allocation

197,000

7(Base Project Allocation - $176,000)

 

8(Design & Contingencies - $21,000)

 

9(51) SR 3004, Resurface, SR 3004 from
10Mountain Road to Mosquito Creek,
11Armstrong and Bastress Townships,
12Project ID 97806

 

13Project Allocation

500,000

14(Base Project Allocation - $500,000)

 

15(52) SR 0220, Resurface, US 220 from Main
16Street to Water Street, Segments
170460/2006 to 0490/0164, Picture Rocks
18Borough, Wolf Township, Project ID
1997700

 

20Project Allocation

591,000

21(Base Project Allocation - $570,000)

 

22(Design & Contingencies - $21,000)

 

23(53) SR 0118, Highway Portion Bridge
24Rehabilitation, PA 118 over Greggs
25Creek, Wolf Township, Project ID 97639

 

26Project Allocation

771,000

27(Base Project Allocation - $500,000)

 

28(Design & Contingencies - $271,00)

 

29(54) SR 0118, Reconstruction, SR 0118
30from Spruce Street to Muncy Creek

 

1Segments 0010/0225 to 0010/2500,
2Hughesville Borough, Wolf Township,
3Project ID 87861

 

4Project Allocation

1,335,000

5(Base Project Allocation - $1,308,000)

 

6(Design & Contingencies - $27,000)

 

7(55) SR 0220, Intersection Improvements,
8SR 0220 from Williamsport to Jersey
9Shore, Piatt and Woodward Townships,
10Project ID 93732

 

11Project Allocation

350,000

12(Base Project Allocation - $350,000)

 

13(56) SR 0180, Highway Portion Bridge
14Replacement, SR 0180 over Lycoming
15Valley Railroad, City of Williamsport,
16Project ID 96579

 

17Project Allocation

6,368,000

18(Base Project Allocation - $5,644,000)

 

19(Land Allocation - $1,000)

 

20(Design & Contingencies - $723,000)

 

21(57) SR 0015, Highway Portion Bridge
22Replacement, US 15 over Black Hole
23Creek, Clinton Township, Project ID
2491436

 

25Project Allocation

2,737,000

26(Base Project Allocation - $2,138,000)

 

27(Design & Contingencies - $599,000)

 

28(58) SR 2018, Highway Portion Bridge
29Rehabilitation, SR 2018 over Millers
30Run, Loyalsock Township, Project ID

 

199337

 

2Project Allocation

1,121,000

3(Base Project Allocation - $971,000)

 

4(Design & Contingencies - $150,000)

 

5(59) SR 3013, Slide Repair, SR 3013 from
6Spring Valley Road to Mahaffey Hollow,
7Woodward Township, Project ID 99373

 

8Project Allocation

1,101,000

9(Base Project Allocation - $751,000)

 

10(Design & Contingencies - $350,000)

 

11(60) SR 0044, Highway Portion Bridge
12Replacement, PA 44 over Upper Pine
13Bottom Run, Cummings Township, Project
14ID 99393

 

15Project Allocation

1,491,000

16(Base Project Allocation - $1,291,000)

 

17(Design & Contingencies - $200,000)

 

18(61) SR 0015, Install High Tension Cable
19Median Barrier, I-180, US 15 and US
20220, Various Municipalities, Project
21ID 99375

 

22Project Allocation

4,651,000

23(Base Project Allocation - $4,451,000)

 

24(Design & Contingencies - $200,000)

 

25(62) SR 0405, Resurface Roadway, SR 0405
26from SR 2014 to SR 2057, Muncy
27Borough, Muncy Creek Township, Project
28ID 98931

 

29Project Allocation

186,000

30(Base Project Allocation - $111,000)

 

1(Design & Contingencies - $75,000)

 

2(63) SR 0180, Highway Portion Bridge
3Painting, I-180, Various
4Municipalities, Project ID 99226

 

5Project Allocation

2,871,000

6(Base Project Allocation - $2,850,000)

 

7(Design & Contingencies - $21,000)

 

8(64) SR 0220, Highway Portion Bridge
9Rehabilitation, US 220 Northbound over
10Ramp A-1 to Fourth Street, Woodward
11Township, Project ID 99228

 

12Project Allocation

621,000

13(Base Project Allocation - $601,000)

 

14(Design & Contingencies - $20,000)

 

15(65) SR 0054, Resurface Roadway, SR 0054
16from SR 0015 to Brouse Road, Clinton
17Township, Project ID 98913

 

18Project Allocation

53,000

19(Base Project Allocation - $30,000)

 

20(Design & Contingencies - $23,000)

 

21(66) SR 2061, Slide Correction, SR 2061
22at Intersection of Crawley Road, Penn
23Township, Project ID 99372

 

24Project Allocation

2,600,000

25(Base Project Allocation - $2,350,000)

 

26(Land Allocation - $50,000)

 

27(Design & Contingencies - $200,000)

 

28(67) SR 0654, Resurface Roadway, SR 0654
29from Cold Water Town Road to Village
30Drive, Bastress and Susquehanna

 

1Townships, Project ID 98932

 

2Project Allocation

161,000

3(Base Project Allocation - $101,000)

 

4(Design & Contingencies - $60,000)

 

5(68) SR 0014, Highway Portion Bridge
6Replacement, PA 14 over Abbots Run,
7McIntyre Township, Project ID 99383

 

8Project Allocation

1,421,000

9(Base Project Allocation - $1,221,000)

 

10(Design & Contingencies - $200,000)

 

11(69) SR 0014, Highway Portion Bridge
12Rehabilitation, PA 14 over Trout Run,
13Lewis Township, Project ID 99227

 

14Project Allocation

323,000

15(Base Project Allocation - $303,000)

 

16(Design & Contingencies - $20,000)

 

17(70) SR 0220, Resurface, US 220 from
18School Street to Arch Street, City of
19Williamsport, Woodward Township,
20Project ID 98990

 

21Project Allocation

3,776,000

22(Base Project Allocation - $3,725,000)

 

23(Design & Contingencies - $51,000)

 

24(71) SR 0284, Resurface Roadway, SR 0284
25from SR 0287 to Flooks Run, Pine
26Township, Project ID 98927

 

27Project Allocation

955,000

28(Base Project Allocation - $884,000)

 

29(Design & Contingencies - $71,000)

 

30(72) SR 0087, Resurface Roadway, SR 0087

 

1from Little Bear Creek Road to Lower
2Manor Road, Plunketts Creek Township,
3Project ID 98919

 

4Project Allocation

80,000

5(Base Project Allocation - $50,000)

 

6(Design & Contingencies – $30,000)

 

7(73) SR 0220, Resurface Roadway, SR 0220
8from Muncy Creek to Main Street, Wolf
9Township, Project ID 98924

 

10Project Allocation

87,000

11(Base Project Allocation - $57,000)

 

12(Design & Contingencies - $30,000)

 

13(74) SR 0044, Highway Portion Bridge
14Replacement, PA 44 over Furnace Run,
15Watson Township, Project ID 99348

 

16Project Allocation

1,421,000

17(Base Project Allocation - $1,221,000)

 

18(Design & Contingencies - $200,000)

 

19(75) SR 2014 and SR 2045, Congestion and
20Safety Improvements, SR 2014 (Lycoming
21Mall Drive) and SR 2014 (Fairfield
22Road), Fairfield Township, Project ID
2398166

 

24Project Allocation

3,000,000

25(Base Project Allocation - $3,000,000)

 

26(76) SR 0284, Resurface Roadway, SR 0284
27from Flooks Run to SR 1009, Jackson
28Township, Project ID 98925

 

29Project Allocation

462,000

30(Base Project Allocation - $432,000)

 

1(Design & Contingencies - $30,000)

 

2(77) SR 0044, Highway Portion Bridge
3Replacement, PA 44 over Tombs Run,
4Watson Township, Project ID 99397

 

5Project Allocation

1,491,000

6(Base Project Allocation - $1,291,000)

 

7(Design & Contingencies - $200,000)

 

8(78) SR 0287, Highway Portion Bridge
9Replacement, PA 287 over Tributary of
10Larry's Creek, Piatt Township, Project
11ID 99352

 

12Project Allocation

1,421,000

13(Base Project Allocation - $1,221,000)

 

14(Design & Contingencies - $200,000)

 

15(79) SR 0220, Highway Portion Bridge
16Rehabilitation, US 220 Southbound over
17Ramp A-1 to Fourth Street, Woodward
18Township, Project ID 99230

 

19Project Allocation

621,000

20(Base Project Allocation - $601,000)

 

21(Design & Contingencies - $20,000)

 

22(80) SR 0180, Highway Portion Bridge
23Rehabilitation, I-180 over Muncy
24Creek, Muncy Creek Township, Project
25ID 98986

 

26Project Allocation

1,451,000

27(Base Project Allocation – $1,300,000)

 

28(Design & Contingencies - $151,000)

 

29(81) SR 2014, Highway Portion Bridge
30Replacement, SR 2014 over Wolf Run,

 

1Muncy Creek Township, Project ID 99359

 

2Project Allocation

1,821,000

3(Base Project Allocation - $1,620,000)

 

4(Design & Contingencies - $201,000)

 

5(82) SR 0220, Resurface, US 220 from
6Plank Road to 0.5 Mile East of
7Northway Road, Piatt and Woodward
8Townships, Project ID 98989

 

9Project Allocation

4,051,000

10(Base Project Allocation - $4,000,000)

 

11(Design & Contingencies - $51,000)

 

12(83) SR 0220, Highway Portion Bridge
13Rehabilitation, US 220 Northbound over
14TR 331 (Antlers Lane), Woodward
15Township, Project ID 99229

 

16Project Allocation

320,000

17(Base Project Allocation - $300,000)

 

18(Design & Contingencies - $20,000)

 

19(84) SR 0220, Highway Portion Bridge
20Rehabilitation, US 220 over Larry's
21Creek, Piatt Township, Project ID
2299235

 

23Project Allocation

1,222,000

24(Base Project Allocation - $1,121,000)

 

25(Design & Contingencies - $101,000)

 

26(85) SR 1017, Resurface, SR 1027 from PA
27973 to Trout Run Mountain Road,
28Segments 0120/0800 to 0250/1901,
29Hepburn and Lewis Townships, Project
30ID 99292

 

1Project Allocation

836,000

2(Base Project Allocation - $816,000)

 

3(Design & Contingencies - $20,000)

 

4(86) SR 0015, Reconstruction, US 15 from
5Main Street to Southern Avenue, South
6Williamsport Borough, Project ID 98983

 

7Project Allocation

3,214,000

8(Base Project Allocation - $2,801,000)

 

9(Land Allocation - $213,000)

 

10(Design & Contingencies - $200,000)

 

11(87) SR 0015, Highway Portion Bridge
12Rehabilitation, US 15 Northbound over
13Trout Run and a Private Drive, Lewis
14Township, Project ID 98984

 

15Project Allocation

1,451,000

16(Base Project Allocation - $1,300,000)

 

17(Design & Contingencies - $151,000)

 

18(88) SR 0220, Highway Portion Bridge
19Rehabilitation, US 220 over Wolf Run,
20Wolf Township, Project ID 99231

 

21Project Allocation

771,000

22(Base Project Allocation - $500,000)

 

23(Design & Contingencies - $271,000)

 

24(89) SR 0180, Highway Portion Bridge
25Rehabilitation, I-180 over Muncy
26Creek, Muncy Creek Township, Project
27ID 98985

 

28Project Allocation

1,452,000

29(Base Project Allocation - $1,302,000)

 

30(Design & Contingencies - $150,000)

 

1(90) SR 0180, Highway Portion Bridge
2Rehabilitation, I-180 over SR 2045
3(Fairfield Road), Fairfield Township,
4Project ID 98988

 

5Project Allocation

502,000

6(Base Project Allocation - $401,000)

 

7(Design & Contingencies - $101,000)

 

8(91) SR 0442, Resurface Roadway, SR 0442
9from SR 2061 to SR 2019, Moreland and
10Muncy Creek Townships, Project ID
1198930

 

12Project Allocation

186,000

13(Base Project Allocation - $110,000)

 

14(Design & Contingencies - $76,000)

 

15(92) SR 0405, Highway Portion Bridge
16Replacement, PA 405 over Tributary of
17Susquehanna River, Clinton Township,
18Montgomery Borough, Project ID 99354

 

19Project Allocation

1,501,000

20(Base Project Allocation - $1,301,000)

 

21(Design & Contingencies - $200,000)

 

22(93) SR 1009, Highway Portion Bridge
23Replacement, SR 1009 over Tributary of
24Blockhouse Creek, Jackson Township,
25Project ID 99025

 

26Project Allocation

231,000

27(Base Project Allocation - $190,000)

 

28(Design & Contingencies - $41,000)

 

29(94) SR 2014, Highway Portion Bridge
30Replacement, SR 2014 over Bennett's

 

1Run, Fairfield Township, Project ID
299038

 

3Project Allocation

1,421,000

4(Base Project Allocation - $1,221,000)

 

5(Design & Contingencies - $200,000)

 

6(95) SR 4004, Highway Portion Bridge
7Replacement, SR 4004 (Granger Lane)
8over Hughes Run, Pine Township,
9Project ID 99037

 

10Project Allocation

231,000

11(Base Project Allocation - $190,000)

 

12(Design & Contingencies - $41,000)

 

13(96) SR 0405, Reconstruction, PA 405 from
14PA 54 to Brick Church Road, Clinton
15Township, Montgomery Borough, Project
16ID 99008

 

17Project Allocation

4,121,000

18(Base Project Allocation - $3,871,000)

 

19(Design & Contingencies - $250,000)

 

20(97) SR 2023, Resurface Roadway, SR 2023
21from SR 0015 to Little League
22Boulevard, City of Williamsport,
23Project ID 98943

 

24Project Allocation

168,000

25(Base Project Allocation – $153,000)

 

26(Design & Contingencies - $15,000)

 

27(98) SR 0287, Highway Portion Bridge
28Replacement, PA 287 over Lick Run,
29Pine Township, Project ID 99400

 

30Project Allocation

1,511,000

1(Base Project Allocation - $1,091,000)

 

2(Design & Contingencies - $420,000)

 

3(99) SR 2023, Resurface Roadway, SR 2023
4from Little League Boulevard to SR
52018, City of Williamsport, Project ID
698944

 

7Project Allocation

80,000

8(Base Project Allocation - $50,000)

 

9(Design & Contingencies - $30,000)

 

10(100) SR 2029, Resurface Roadway, SR 2029
11from Miller Hill Road to SR 0973,
12Eldred and Loyalsock Townships,
13Project ID 98947

 

14Project Allocation

83,000

15(Base Project Allocation - $52,000)

 

16(Design & Contingencies - $31,000)

 

17(101) SR 3007, Highway Portion Bridge
18Replacement, SR 3007 (Level Corners
19Road) over Pine Run, Piatt and
20Woodward Townships, Project ID 99036

 

21Project Allocation

297,000

22(Base Project Allocation - $181,000)

 

23(Land Allocation - $65,000)

 

24(Design & Contingencies - $51,000)

 

25(102) SR 2029, Resurface Roadway, SR 2029
26from SR 2014 to SR 2024, Loyalsock
27Township, Project ID 98948

 

28Project Allocation

166,000

29(Base Project Allocation - $106,000)

 

30(Design & Contingencies - $60,000)

 

1(103) SR 2049, Resurface Roadway, SR 2049
2from Pond Road to Mall Road, Muncy
3Township, Project ID 98949

 

4Project Allocation

278,000

5(Base Project Allocation - $247,000)

 

6(Design & Contingencies - $31,000)

 

7(104) SR 2061, Resurface Roadway, SR 2061
8from SR 0118 to Crawley Road,
9Moreland, Penn and Wolf Townships,
10Project ID 98952

 

11Project Allocation

183,000

12(Base Project Allocation - $160,000)

 

13(Design & Contingencies - $23,000)

 

14(105) SR 2061, Resurface Roadway, SR 2061
15from SR 2073 to the Sullivan County
16Line, Penn Township, Project ID 98954

 

17Project Allocation

183,000

18(Base Project Allocation - $160,000)

 

19(Design & Contingencies - $23,000)

 

20(106) SR 0180, Highway Portion Bridge
21Rehabilitation, I-180 over SR 0405,
22Muncy Creek Township, Project ID 99045

 

23Project Allocation

3,501,000

24(Base Project Allocation - $3,350,000)

 

25(Design & Contingencies - $151,000)

 

26(107) SR 1006, Highway Portion Bridge
27Replacement, SR 1006 over Slacks Run,
28Cascade Township, Project ID 99013

 

29Project Allocation

250,000

30(Base Project Allocation - $150,000)

 

1(Land Allocation - $20,000)

 

2(Design & Contingencies - $80,000)

 

3(108) SR 0044, Resurface, SR 0044 from PA
4880 to SR 3003, Segments 0344/0968 to
50420/1918, Jersey Shore Borough,
6Limestone and Nippenose Townships,
7Project ID 99280

 

8Project Allocation

1,322,000

9(Base Project Allocation - $1,301,000)

 

10(Design & Contingencies - $21,000)

 

11(109) SR 3015, Highway Portion Bridge
12Rehabilitation, SR 3015 over Cogan
13Run, Anthony Township, Project ID
1499232

 

15Project Allocation

67,000

16(Base Project Allocation - $65,000)

 

17(Design & Contingencies - $2,000)

 

18(110) SR 0014, Highway Portion Bridge
19Rehabilitation, PA 14 over Red Run,
20McIntyre Township, Project ID 99233

 

21Project Allocation

891,000

22(Base Project Allocation - $870,000)

 

23(Design & Contingencies - $21,000)

 

24(111) SR 3014, Resurface Roadway, SR 3014
25from SR 3015 to Princeton Avenue, Old
26Lycoming Township, Project ID 98957

 

27Project Allocation

650,000

28(Base Project Allocation - $605,000)

 

29(Design & Contingencies - $45,000)

 

30(112) SR 1010, Highway Portion Bridge

 

1Replacement, SR 1010 over Little Elk
2Run, Jackson Township, Project ID
399027

 

4Project Allocation

262,000

5(Base Project Allocation - $191,000)

 

6(Land Allocation - $30,000)

 

7(Design & Contingencies - $41,000)

 

8(113) I-180, Reconstruction, I-180 from
9the Northumberland County Line to its
10Western Terminus in City of
11Williamsport, Various Municipalities,
12Project ID 0

 

13Project Allocation

78,000,000

14(Base Project Allocation -
15$78,000,000)

 

16(114) SR 1017, Resurface, SR 1017
17(Lycoming Creek Road) from High Street
18to Pleasant Hill Road, Loyalsock,
19Lycoming and Old Lycoming Townships,
20Project ID 99029

 

21Project Allocation

3,191,000

22(Base Project Allocation - $3,091,000)

 

23(Design & Contingencies - $100,000)

 

24(115) SR 0014, Highway Portion Bridge
25Preservation, PA 14, SR 1017 (Lycoming
26Creek Road) and SR 3021 (Memorial
27Avenue) over Lycoming Creek,
28Loyalsock, McIntyre and Old Lycoming
29Townships, City of Williamsport,
30Project ID 99030

 

1Project Allocation

931,000

2(Base Project Allocation - $901,000)

 

3(Design & Contingencies - $30,000)

 

4(116) SR 2004, Highway Portion Bridge
5Replacement, SR 2004 over Tributary of
6Spring Creek, Washington Township,
7Project ID 99031

 

8Project Allocation

231,000

9(Base Project Allocation - $150,000)

 

10(Design & Contingencies - $81,000)

 

11(117) SR 2004, Highway Portion Bridge
12Replacement, SR 2004 (Alvira Road)
13over Tributary of Spring Creek,
14Washington Township, Project ID 99032

 

15Project Allocation

296,000

16(Base Project Allocation - $151,000)

 

17(Land Allocation - $65,000)

 

18(Design & Contingencies - $80,000)

 

19(118) SR 2014, Resurface, SR 2014 (Third
20Street) from River Avenue to Loyalsock
21Creek, Loyalsock Township, Project ID
2299033

 

23Project Allocation

2,136,000

24(Base Project Allocation - $2,001,000)

 

25(Design & Contingencies - $135,000)

 

26(119) SR 4010, Resurface Roadway, SR 4010
27from SR 0184 to Larry's Creek, Cogan
28House Township, Project ID 98961

 

29Project Allocation

438,000

30(Base Project Allocation - $407,000)

 

1(Design & Contingencies - $31,000)

 

2(120) SR 2073, Highway Portion Bridge
3Replacement, SR 2073 over Greggs Run,
4Wolf Township, Project ID 99035

 

5Project Allocation

191,000

6(Base Project Allocation - $150,000)

 

7(Design & Contingencies - $41,000)

 

8(121) SR 0180, Highway Portion Bridge
9Rehabilitation, I-180 over Maynard
10Street, City of Williamsport, Project
11ID 99234

 

12Project Allocation

1,151,000

13(Base Project Allocation - $1,051,000)

 

14(Design & Contingencies - $100,000)

 

15(122) SR 0220, Highway Portion Bridge
16Rehabilitation, US 220 over Pine Run,
17Piatt and Woodward Townships, Project
18ID 99236

 

19Project Allocation

1,321,000

20(Base Project Allocation - $1,220,000)

 

21(Design & Contingencies - $101,000)

 

22(123) SR 0414, Highway Portion Bridge
23Replacement, PA 414 over Truman Run,
24McHenry Township, Project ID 99402

 

25Project Allocation

1,511,000

26(Base Project Allocation - $1,091,000)

 

27(Design & Contingencies - $420,000)

 

28(124) SR 0973, Resurface Roadway, SR 0973
29from SR 0044 to SR 0287, Mifflin and
30Watson Townships, Project ID 98934

 

1Project Allocation

856,000

2(Base Project Allocation - $796,000)

 

3(Design & Contingencies - $60,000)

 

4(125) SR 0014, Rehabilitation, Resurface,
5SR 0014 from Red Run to Tioga County,
6McIntyre Township, Project ID 98508

 

7Project Allocation

1,176,000

8(Base Project Allocation - $1,150,000)

 

9(Design & Contingencies - $26,000)

 

10(126) SR 0973, Resurface Roadway, SR 0973
11on SR 1017 to SR 2029, Eldred and
12Hepburn Townships, Project ID 98935

 

13Project Allocation

168,000

14(Base Project Allocation - $108,000)

 

15(Design & Contingencies - $60,000)

 

16(127) SR 2083, Highway Portion Bridge
17Replacement, SR 2083 over Lick Run,
18Shrewsbury Township, Project ID 99408

 

19Project Allocation

1,422,000

20(Base Project Allocation - $1,421,000)

 

21(Design & Contingencies - $1,000)

 

22(128) SR 0973, Highway Portion Bridge
23Rehabilitation, PA 973 over Mill
24Creek, Hepburn Township, Project ID
2599237

 

26Project Allocation

821,000

27(Base Project Allocation - $670,000)

 

28(Design & Contingencies - $151,000)

 

29(129) SR 0973, Resurface, PA 973 from
30Long Run to SR 1017 (Lycoming Creek

 

1Road), Hepburn Township, Project ID
299411

 

3Project Allocation

592,000

4(Base Project Allocation - $576,000)

 

5(Design & Contingencies - $16,000)

 

6(130) SR 2014, Resurface Roadway, SR 2014 
7from Shadduck Road to SR 0405, Muncy 
8Borough, Muncy Creek Township, Project 
9ID 98938

 

10Project Allocation

78,000

11(Base Project Allocation - $47,000)

 

12(Design & Contingencies - $31,000)

 

13(131) SR 0220, Resurface, US 220 from
14Water Street to Muncy Creek, Penn
15Township, Picture Rocks Borough,
16Shrewsbury Township, Project ID 99003

 

17Project Allocation

4,172,000

18(Base Project Allocation - $4,101,000)

 

19(Design & Contingencies - $71,000)

 

20(132) SR 0087, Resurface, SR 0087,
21Plunketts Creek and Upper Fairfield
22Townships, Project ID 99451

 

23Project Allocation

99,000

24(Base Project Allocation - $58,000)

 

25(Design & Contingencies - $41,000)

 

26(133) SR 1017, Highway Portion
27Rehabilitation, SR 1017 over Trout
28Run, Lewis Township, Project ID 99051

 

29Project Allocation

701,000

30(Base Project Allocation - $600,000)

 

1(Design & Contingencies - $101,000)

 

2(134) SR 0287, Resurface, PA 287 from 1
3Mile South of Oregon Hill Road to
4Tioga County Line, Pine Township,
5Project ID 99005

 

6Project Allocation

2,014,000

7(Base Project Allocation - $1,951,000)

 

8(Design & Contingencies - $63,000)

 

9(135) SR 2014, Resurface Roadway, SR 2014
10from SR 2045 to Odell Road, Fairfield
11Township, Montoursville Borough,
12Project ID 98940

 

13Project Allocation

201,000

14(Base Project Allocation - $125,000)

 

15(Design & Contingencies - $76,000)

 

16(136) SR 2016, Resurface Roadway, SR 2016
17from SR 1017 to Hepburn Street,
18Loyalsock and Old Lycoming Townships,
19City of Williamsport, Project ID 98942

 

20Project Allocation

213,000

21(Base Project Allocation - $138,000)

 

22(Design & Contingencies - $75,000)

 

23(137) SR 2014, Reconstruct, SR 2014 from
24PA 405 (Water Street) to Rose Hill
25Road, Muncy Borough, Muncy Creek
26Township, Project ID 99410

 

27Project Allocation

3,501,000

28(Base Project Allocation - $3,000,000)

 

29(Design & Contingencies - $501,000)

 

30(138) Various, Highway Portion of Bridge

 

1Preservation, Various State Routes,
2Various Municipalities, Project ID
399034

 

4Project Allocation

2,002,000

5(Base Project Allocation - $1,901,000)

 

6(Design & Contingencies - $101,000)

 

7(139) Various, Highway Portion Bridge
8Rehabilitation, Various Routes,
9Various Municipalities, Project ID
1087918

 

11Project Allocation

905,000

12(Base Project Allocation - $800,000)

 

13(Land Allocation - $75,000)

 

14(Design & Contingencies - $30,000)

 

15Section 342. McKean County.

16Projects are as follows:

 

17(1) (Reserved).

 

18(2) SR 0120, Highway Restoration,
19Smethport Area, SR 0006 Segment
200790/0000 to 0930/0000, Keating and
21Liberty Townships, Port Allegany
22Borough, Project ID 88281

 

23Project Allocation

800,000

24(Base Project Allocation - $800,000)

 

25(3) SR 2002, Highway Restoration, SR 0006
26Segment 0110/1994 to 0210/0000,
27Hamilton and Wetmore Townships, Kane
28Borough, Project ID 88279

 

29Project Allocation

600,000

30(Base Project Allocation - $600,000)

 

1(4) SR 0006, Highway Reconstruction, SR
20006 Segments 0010 through 1040,
3Hamilton and Wetmore Townships, Kane
4Borough, Hamlin Township, Mount Jewett
5Borough, Keating Township, Smethport
6Borough, Liberty Township, Port
7Allegany Borough, Project ID 92730

 

8Project Allocation

1,000,000

9(Base Project Allocation - $1,000,000)

 

10(5) SR 0046, Highway Restoration, Potter
11County Line to Two Mile Creek, Liberty
12Township, Port Allegany Borough,
13Project ID 88282

 

14Project Allocation

1,000,000

15(Base Project Allocation - $1,000,000)

 

16(6) SR 0006, SR 0044, SR 0120, Highway
17Restoration, McKean County SR 0006
18Segments 0520 and 0530, SR 0044
19Segment 0089, SR 0046 Segments 0520
20through 0580, Cameron County SR 0120
21Segments 0270 through 0490, Various
22Municipalities in McKean and Cameron
23Counties, Project ID 91092

 

24Project Allocation

2,468,000

25(Base Project Allocation - $2,468,000)

 

26(7) SR 0050, Highway Portion Bridge
27Replacement, SR 0059 over Tributary of
28Kinzua Creek, BMS 42-0059-0450-0000,
29Keating Township, Project ID 88664

 

30Project Allocation

2,449,000

1(Base Project Allocation - $1,480,000)

 

2(Land Allocation - $182,000)

 

3(Design & Contingencies - $787,000)

 

4(8) SR 0059, Highway Portion Bridge
5Replacement, SR 0059 over Three Mile
6Run BMS 42-0059-0380-0699, Lafayette
7Township, Project ID 88639

 

8Project Allocation

418,000

9(Base Project Allocation - $235,000)

 

10(Land Allocation - $24,000)

 

11(Design & Contingencies - $159,000)

 

12(9) SR 0446, Safety Improvement, SR 0446,
13Segments 0260/1231 to 0270/1381,
14Eldred Township, Project ID 91939

 

15Project Allocation

300,000

16(Base Project Allocation - $200,000)

 

17(Design & Contingencies - $100,000)

 

18(10) SR 0770, Highway Portion Bridge
19Replacement, SR 0770 over Sheppard Run
20BMS 42-0770-0140-0000, Bradford
21Township, Project ID 88630

 

22Project Allocation

1,520,000

23(Base Project Allocation - $942,000)

 

24(Land Allocation - $109,000)

 

25(Design & Contingencies - $469,000)

 

26(11) SR 1005, Highway Portion Bridge
27Replacement, SR 1005, Ceres Township,
28Project ID 68955

 

29Project Allocation

1,005,000

30(Base Project Allocation - $538,000)

 

1(Land Allocation - $108,000)

 

2(Design & Contingencies - $359,000)

 

3(12) SR 0006, Resurface, SR 0006 from
4Ludlow to Lantz Corners, Segments
50010/0000 to 0370/0000, Hamilton and
6Hamlin Townships, Kane Borough,
7Wetmore Township, Project ID 93354

 

8Project Allocation

12,951,000

9(Base Project Allocation -
10$12,450,000)

 

11(Land Allocation - $100,000)

 

12(Design & Contingencies - $401,000)

 

13(13) SR 0006, Highway Portion Bridge
14Replacement, SR 0006 over Ostrander
15Hollow, BMS 42-0006-0890-0000, Liberty
16Township, Project ID 88624

 

17Project Allocation

193,000

18(Base Project Allocation - $193,000)

 

19(14) SR 0346, Resurface, SR 0346 (West
20Washington Street) from Bradford City
21Line to Mechanic Street, Segments
220310/1504 to 0330/2118, City of
23Bradford, Bradford Township, Project
24ID 93344

 

25Project Allocation

2,253,000

26(Base Project Allocation - $1,501,000)

 

27(Land Allocation - $401,000)

 

28(Design & Contingencies - $351,000)

 

29(15) SR 0321, Highway Portion Bridge
30Replacements, PA 321 over Mullin Run,

 

1Segments 0560/0000 and 570/0000
2Northwest of Marshburg, Corydon
3Township, Project ID 91270

 

4Project Allocation

289,000

5(Base Project Allocation - $105,000)

 

6(Land Allocation - $27,000)

 

7(Design & Contingencies - $157,000)

 

8(16) SR 4005, Resurface, SR 4005 (High
9Street), Segments 0010/0000 to
100050/1060, Bradford Township, Project
11ID 93347

 

12Project Allocation

2,401,000

13(Base Project Allocation - $1,650,000)

 

14(Land Allocation - $401,000)

 

15(Design & Contingencies - $350,000)

 

16(17) SR 0346, Highway Portion Bridge
17Replacement, SR 0346 over Tram Hollow
18Run BMS 42-0346-0490-0000, Otto
19Township, Project ID 88633

 

20Project Allocation

160,000

21(Base Project Allocation - $160,000)

 

22(18) SR 0046, Highway Betterment, SR
230046, Segments 0320 to 0390, Keating
24Township, Smethport Borough, Project
25ID 91105

 

26Project Allocation

2,450,000

27(Base Project Allocation - $2,450,000)

 

28(19) SR 0059, Highway Portion Bridge
29Replacement, SR 0059 over Blacksmith
30Run BMS 42-0059-0560-1247, Keating

 

1Township, Project ID 88180

 

2Project Allocation

345,000

3(Design & Contingencies - $345,000)

 

4(20) SR 0006, Highway Portion Bridge
5Replacement, SR 0006 over Lillibridge
6Creek BMS 42-0006-0960-0339, Port
7Allegany Borough, Project ID 88177

 

8Project Allocation

411,000

9(Design & Contingencies - $411,000)

 

10(21) SR 0146, Highway Portion Bridge
11Replacement, SR 0146 over Red Mill
12Brook, Segment 0170 Offset 0000 near
13Clermont, Norwich Township, Project ID
1491527

 

15Project Allocation

2,005,000

16(Base Project Allocation - $1,179,000)

 

17(Land Allocation - $155,000)

 

18(Design & Contingencies - $671,000)

 

19(22) SR 0006, Reconstruction, US 6,
20Smethport to Potter County Line, Port
21Allegany to the Potter County Line,
22Hamlin, Keating and Liberty Townships,
23Port Allegany and Smethport Boroughs,
24Project ID 97951

 

25Project Allocation

6,500,000

26(Base Project Allocation - $6,500,000)

 

27(23) SR 0155, Highway Portion Bridge
28Replacement, SR 0155 over Portage
29Creek BMS 42-0155-0020-0000, Liberty
30Township, Project ID 88183

 

1Project Allocation

1,466,000

2(Base Project Allocation - $1,067,000)

 

3(Land Allocation - $75,000)

 

4(Design & Contingencies - $324,000)

 

5(24) SR 0155, Highway Reconstruction, SR
60155 Port Allegheny Borough South to
7the Potter County Line, Liberty
8Township, Port Allegany Borough,
9Project ID 91969

 

10Project Allocation

600,000

11(Base Project Allocation - $400,000)

 

12(Design & Contingencies - $200,000)

 

13(25) SR 0022, Safety Improvements, SR
144005, Segment 0112 Offset 0049 to
150120/3087, City of Bradford, Foster
16Township, Project ID 88243

 

17Project Allocation

400,000

18(Base Project Allocation - $100,000)

 

19(Land Allocation - $100,000)

 

20(Design & Contingencies - $200,000)

 

21(26) SR 0219, Highway Reconstruction, US
22219, Northbound Segments 0482 to 0594
23and Southbound Segments 0505 to 0595,
24Bradford and Foster Townships, City of
25Bradford, Project ID 4405

 

26Project Allocation

6,201,000

27(Base Project Allocation - $6,000,000)

 

28(Land Allocation - $1,000)

 

29(Design & Contingencies - $200,000)

 

30(27) SR 1015, Highway Portion Bridge

 

1Replacement, SR 1015 over North Branch
2Cole Creek BMS 42-1015-0010-0472,
3Keating Township, Project ID 68965

 

4Project Allocation

971,000

5(Base Project Allocation - $265,000)

 

6(Land Allocation - $133,000)

 

7(Design & Contingencies - $573,000)

 

8(28) SR 4005, Resurface, SR 4005 (Main
9Street), Segments 0112/0000 to
100120/3087, City of Bradford, Foster
11Township, Project ID 93348

 

12Project Allocation

2,253,000

13(Base Project Allocation - $1,501,000)

 

14(Land Allocation - $401,000)

 

15(Design & Contingencies - $351,000)

 

16(29) SR 1002, Highway Portion Bridge
17Replacement, SR 1002 over Potato
18Creek, Keating Township, Project ID
194361

 

20Project Allocation

343,000

21(Base Project Allocation - $340,000)

 

22(Design & Contingencies - $3,000)

 

23(30) SR 0059, Safety Improvements, SR
240059, Riderville Road, Segments
250370/1469 to 0380/0590, Lafayette
26Township, Project ID 91948

 

27Project Allocation

300,000

28(Base Project Allocation - $200,000)

 

29(Design & Contingencies - $100,000)

 

30(31) SR 0006, Resurface, US 0006 from

 

1Lantz Corners to Mount Jewett,
2Segments 0380/0000 to 0450/2364,
3Hamlin Township, Mount Jewett Borough,
4Project ID 96265

 

5Project Allocation

1,506,000

6(Base Project Allocation - $1,305,000)

 

7(Design & Contingencies - $201,000)

 

8(32) SR 0059, Resurface, PA 59 from US
9219 to Smethport, Segments 0290/0000
10to 0580/0000, Keating and Lafayette
11Townships, Smethport Borough, Project
12ID 93358

 

13Project Allocation

8,702,000

14(Base Project Allocation - $8,500,000)

 

15(Land Allocation - $101,000)

 

16(Design & Contingencies - $101,000)

 

17(33) SR 0155, Resurface, Keating to Port
18Allegheny, McKean County to Port
19Allegany Borough, Liberty Township,
20Potter County, Keating Township,
21Project ID 93364

 

22Project Allocation

760,000

23(Base Project Allocation - $445,000)

 

24(Land Allocation - $120,000)

 

25(Design & Contingencies - $195,000)

 

26(34) SR 0006, Resurface, SR 0006 from
27Smethport to Port Allegany Borough,
28Segments 0770/0345 to 1040/2654,
29Keating and Liberty Townships, Port
30Allegany and Smethport Boroughs,

 

1Project ID 93362

 

2Project Allocation

1,979,000

3(Base Project Allocation - $1,788,000)

 

4(Land Allocation - $100,000)

 

5(Design & Contingencies - $91,000)

 

6(35) SR 0006, Resurface, SR 0006 from
7Hazelhurst into Keating Township,
8Segments 0510/2145 to 0650/0000,
9Hamlin and Keating Townships, Project
10ID 93359

 

11Project Allocation

1,302,000

12(Base Project Allocation - $1,101,000)

 

13(Land Allocation - $101,000)

 

14(Design & Contingencies - $100,000)

 

15(36) SR 4004, Safety Improvement, SR
164004, Washington Street to Campus
17Drive, Bradford Township, Project ID
1891946

 

19Project Allocation

300,000

20(Base Project Allocation - $200,000)

 

21(Design & Contingencies - $100,000)

 

22(37) SR 0219, Resurface, SR 0219 from the
23Elk County Line to Halsey, Segments
240010/0000 to 0070/0000, Sergeant
25Township, Project ID 96266

 

26Project Allocation

1,800,000

27(Base Project Allocation - $1,800,000)

 

28(38) SR 0046, Betterment (Restoration),
29PA 36, Keating and Otto Townships,
30Project ID 101790

 

1Project Allocation

436,000

2(Base Project Allocation - $285,000)

 

3(Design & Contingencies - $151,000)

 

4(39) SR 0059, Betterment (Restoration),
5PA 59, Corydon and Lafayette
6Townships, Project ID 101811

 

7Project Allocation

4,551,000

8(Base Project Allocation - $4,400,000)

 

9(Design & Contingencies - $151,000)

 

10(40) SR 0346, Resurface, PA 346 from
11Willow Creek to Vernon Lane, Segments
120160/0000 to 0270/0000, Bradford and
13Corydon Townships, Project ID 101331

 

14Project Allocation

1,566,000

15(Base Project Allocation - $1,566,000)

 

16(41) SR 4001, Betterment (Restoration),
17SR 4000 Quad Routes, City of Bradford,
18Bradford, Foster, Keating, Lafayette
19Townships, Lewis Run Borough, Project
20ID 101945

 

21Project Allocation

8,582,000

22(Base Project Allocation - $8,431,000)

 

23(Design & Contingencies - $151,000)

 

24(42) SR 0219, Resurface, US 219 from
25Lantz Corners toward Lafayette
26Township, Segments 0120/0000 to
270160/0000, Hamlin Township, Project ID
28101346

 

29Project Allocation

3,000,000

30(Base Project Allocation - $3,000,000)

 

1(43) SR 3001, Betterment (Restoration),
2SR 3000 Quad Routes, Various, Project
3ID 101944

 

4Project Allocation

17,617,000

5(Base Project Allocation -
6$17,466,000)

 

7(Design & Contingencies - $151,000)

 

8(44) SR 2001, Betterment (Restoration),
9SR 2000 Quad Routes, Norwich and
10Sergeant Townships, Project ID 101943

 

11Project Allocation

6,325,000

12(Base Project Allocation - $6,175,000)

 

13(Design & Contingencies - $150,000)

 

14(45) SR 0346, Resurface, PA 346 from
15Warren to Willow Creek Bridge,
16Segments 0010/0000 to 0160/0000,
17Corydon Township, Project ID 101333

 

18Project Allocation

3,000,000

19(Base Project Allocation - $3,000,000)

 

20(46) SR 1001, Betterment (Restoration),
21SR 1000 Quad Routes, Annin and Ceres
22Townships, Eldred Borough, Eldred,
23Keating, Liberty and Otto Townships,
24Port Allegany Borough, Project ID
25101942

 

26Project Allocation

10,027,000

27(Base Project Allocation - $9,876,000)

 

28(Design & Contingencies - $151,000)

 

29(47) SR 0046, Resurface, PA 46 North to
30US 6, Segments 0080/0000 to 0310/2666,

 

1Keating and Norwich Townships, Project
2ID 101343

 

3Project Allocation

4,900,000

4(Base Project Allocation - $4,900,000)

 

5(48) SR 0346, Resurface, PA 346 from US
6219 to PA 446, Segments 0370/0000 to
70630/1195, Eldred Borough, Eldred,
8Foster and Otto Townships, Project ID
9101349

 

10Project Allocation

5,800,000

11(Base Project Allocation - $5,800,000)

 

12(49) SR 0146, Betterment (Restoration),
13PA 0146, Hamlin, Norwich and Sergeant
14Townships, Project ID 101814

 

15Project Allocation

5,221,000

16(Base Project Allocation - $5,071,000)

 

17(Design & Contingencies - $150,000)

 

18(50) SR 0046, Resurface, PA 46 from US 6
19to PA 646, Segments 0320/0000 to
200520/0000, Foster, Keating and Otto
21Townships, Smethport Borough, Project
22ID 101326

 

23Project Allocation

4,152,000

24(Base Project Allocation - $4,152,000)

 

25(51) SR 0059, Resurface, SR 0059 from PA
26770 to US 219, Lafayette Township,
27Project ID 101312

 

28Project Allocation

1,476,000

29(Base Project Allocation - $1,476,000)

 

30(52) SR 0446, Resurface, PA 446 from PA

 

146 to State Line Road, Segments
20010/0000 to 0270/2661, Eldred
3Borough, Eldred and Keating Townships,
4Project ID 101336

 

5Project Allocation

4,538,000

6(Base Project Allocation - $4,538,000)

 

7(53) SR 0006, Resurface, US 6 from Near
8Iron Hollow to Main Street, Segments
90650/0000 to 0770/0000, Keating
10Township, Smethport Borough, Project
11ID 101319

 

12Project Allocation

2,000,000

13(Base Project Allocation - $2,000,000)

 

14(54) SR 0246, Betterment (Restoration),
15PA 246, Foster and Otto Townships,
16Project ID 101880

 

17Project Allocation

4,381,000

18(Base Project Allocation - $4,230,000)

 

19(Design & Contingencies - $151,000)

 

20(55) SR 0321, Resurface, PA 321 from near
21Forestry 262 Road to White Gravel Run,
22Segments 0270/0000 to 0400/1500,
23Hamilton Township, Project ID 101325

 

24Project Allocation

2,292,000

25(Base Project Allocation - $2,292,000)

 

26(56) SR 0006, Resurface, SR 0006 from PA
27155 to Mill Street, Segments 0940/0000
28to 0960/0000, Port Allegany Borough,
29Project ID 101317

 

30Project Allocation

500,000

1(Base Project Allocation - $500,000)

 

2(57) SR 0219, Betterment (Restoration),
3US 219, Bradford, Foster, Hamlin and
4Lafayette Townships, Lewis Run
5Borough, Project ID 101884

 

6Project Allocation

10,491,000

7(Base Project Allocation -
8$10,341,000)

 

9(Design & Contingencies - $150,000)

 

10(58) SR 0006, Truck Climbing Lane, US 6
11from Smethport to Port Allegany,
12Keating and Liberty Townships, Project
13ID 102535

 

14Project Allocation

11,300,000

15(Base Project Allocation -
16$10,000,000)

 

17(Land Allocation - $600,000)

 

18(Design & Contingencies - $700,000)

 

19(59) SR 0321, Betterment (Restoration),
20PA 321, Corydon and Hamilton
21Townships, Kane Borough, Lafayette and
22Wetmore Townships, Project ID 101881

 

23Project Allocation

12,632,000

24(Base Project Allocation -
25$12,481,000)

 

26(Design & Contingencies - $151,000)

 

27(60) SR 0046, Resurface, PA 46 from
28Kendall Creek Bridge to Bypass,
29Segments 0600/0000 to 0650/0858, City
30of Bradford, Foster Township, Project

 

1ID 101330

 

2Project Allocation

1,000,000

3(Base Project Allocation - $1,000,000)

 

4(61) SR 0546, Betterment (Restoration),
5PA 546, Otto Township, Project ID
6101882

 

7Project Allocation

1,946,000

8(Base Project Allocation - $1,795,000)

 

9(Design & Contingencies - $151,000)

 

10(62) SR 0155, Resurface, SR 0155 from the
11Potter County Line to US 6, Segments
120010/0000 to 0160/2713, Liberty
13Township, Port Allegany Borough,
14Project ID 101314

 

15Project Allocation

2,348,000

16(Base Project Allocation - $2,348,000)

 

17(63) SR 646, Betterment (Restoration), PA
180646, Bradford, Foster, Keating and
19Otto Townships, Project ID 101883

 

20Project Allocation

8,751,000

21(Base Project Allocation - $8,601,000)

 

22(Design & Contingencies - $150,000)

 

23(64) SR 0321, Resurface, PA 321 from Four
24Mile Run toward Forestry 262 Road,
25Segments 0180/0000 to 0270/0000,
26Hamilton and Wetmore Townships,
27Project ID 101321

 

28Project Allocation

1,914,000

29(Base Project Allocation - $1,914,000)

 

30(65) SR 0066, Betterment (Restoration),

 

1PA 66, Kane Borough, Wetmore Township,
2Project ID 101879

 

3Project Allocation

1,582,000

4(Base Project Allocation - $1,431,000)

 

5(Design & Contingencies - $151,000)

 

6(66) Various, Highway Restoration,
7Various Segments of SR 0006, SR 0346,
8SR 1011, SR 0219, SR 3005, SR 4002, SR
94007 and Various Municipalities,
10Project ID 91090

 

11Project Allocation

2,859,000

12(Base Project Allocation - $2,859,000)

 

13(67) Various, Highway Restoration, McKean
14County SR 0006, Segments 0740 through
150770, SR 0046, Segments 0190 through
160460, SR 0446, Segments 0010 through
170120, Potter County SR 1009, Segments
180010 through 0040, SR 2001 Segment
190060, SR 2002, Segments 0010 through
200240, Various Municipalities in McKean
21and Potter Counties, Project ID 91084

 

22Project Allocation

7,100,000

23(Base Project Allocation - $7,100,000)

 

24(68) Various, Highway Portion Bridge
25Preservation, Various State Routes,
26Various Municipalities, Project ID
274354

 

28Project Allocation

220,000

29(Base Project Allocation - $107,000)

 

30(Land Allocation - $4,000)

 

1(Design & Contingencies - $109,000)

 

2Section 343. Mercer County.

3Projects are as follows:

 

4(1) (Reserved).

 

5(2) SR 0058, Restoration, SR 0058
6(Liberty Street/Jamestown Road) from
7Jamestown to Greenville, Greene
8Township, Greenville Borough, Hepfield
9Township, Jamestown Borough and West
10Salem Township, Project ID 89171

 

11Project Allocation

2,951,000

12(Base Project Allocation - $2,900,000)

 

13(Design & Contingencies - $51,000)

 

14(3) SR 0019, Safety Improvement, SR 0019
15(Perry Highway/Franklin Street) from
16I-80 (Z H Confair Highway) to SR 0062,
17Coolspring and East Lackawannock
18Townships, Mercer Borough and
19Springfield Township, Project ID 97907

 

20Project Allocation

3,000,000

21(Base Project Allocation - $3,000,000)

 

22(4) SR 0208, Restoration/Resurface, SR
230208 from SR 0258 (Mercer Grove City
24Road) to Gregg Street (TR 302), Grove
25City Borough, Pine and Springfield
26Townships, Project ID 98030

 

27Project Allocation

2,550,000

28(Base Project Allocation - $2,500,000)

 

29(Design & Contingencies - $50,000)

 

30(5) SR 3025, Restoration, Mill, Overlay

 

1and ADA Ramps, SR 3025 (Buhl Farm
2Drive) from SR 0418 to SR 3014, City
3of Hermitage, Project ID 94769

 

4Project Allocation

169,000

5(Base Project Allocation - $169,000)

 

6(6) SR 3023, Resurface, SR 3023 (Seventh
7Avenue) from Hazen Road to Ridge Road,
8Sharpsville Borough, Project ID 32321

 

9Project Allocation

350,000

10(Base Project Allocation - $350,000)

 

11(7) SR 0062, Highway Restoration, SR 0062
12(Irvine Avenue/Connelly Boulevard)
13from the Ohio State Line to Stambaugh
14Avenue, City of Sharon, Project ID
1594770

 

16Project Allocation

307,000

17(Base Project Allocation - $294,000)

 

18(Land Allocation - $13,000)

 

19(8) SR 0062, Restoration/Resurface, SR
200062 (Shenango Valley Expressway) from
21SR 0018 to State Street, City of
22Hermitage, Project ID 97901

 

23Project Allocation

250,000

24(Base Project Allocation - $250,000)

 

25(9) SR 0018, Resurface, Mill and Overlay,
26SR 0018 (New Castle Road), SR 0358
27from Main Street to Hadley Road, SR
280158 (Mercer Road), East Lackawannock
29Township, Greenville Borough,
30Hempfield, Shenango and Wilmington

 

1Townships, Project ID 96116

 

2Project Allocation

2,186,000

3(Base Project Allocation - $2,186,000)

 

4(10) SR 0019, Replace/Upgrade
5Signalization and Restrict movements
6on North Street, SR 0019 (Perry
7Highway) at the Five Legged
8Intersection with SR 0062, SR 0058
9(Greenville Road) and North Street,
10Mercer Borough, Project ID 95568

 

11Project Allocation

355,000

12(Base Project Allocation - $105,000)

 

13(Design & Contingencies - $250,000)

 

14(11) SR 3012, Restoration, SR 3012 (Clark
15Street) from SR 0518 (North
16Sharpsville Road) to SR 0718, Cities
17of Hermitage and Sharon, Project ID
1898025

 

19Project Allocation

95,000

20(Base Project Allocation - $45,000)

 

21(Design & Contingencies - $50,000)

 

22(12) SR 3017, Resurface, SR 3017 (Indiana
23Avenue) from SR 0418 (Mercer Avenue),
24City of Ferrell, Project ID 32320

 

25Project Allocation

335,000

26(Base Project Allocation - $325,000)

 

27(Design & Contingencies - $10,000)

 

28(13) SR 0358, Restoration/Resurfacing, SR
290358 (Hadley Road) from Billy Boyd
30Road to SR 0062, and SR 2021

 

1(Hendersonville Road) from Sandy Lake
2to SR 0965, Lake and Worth Townships,
3Project ID 96884

 

4Project Allocation

2,153,000

5(Base Project Allocation - $2,153,000)

 

6(14) SR 3008, Restoration, SR 3008 and SR
70518 (State Street), City of Sharon,
8Project ID 96362

 

9Project Allocation

1,391,000

10(Base Project Allocation - $801,000)

 

11(Land Allocation - $40,000)

 

12(Design & Contingencies - $550,000)

 

13(15) SR 0760, Restoration/Resurface, SR
140760 (Beaver Valley Expressway) from
15I-80 to Broadway Avenue, City of
16Hermitage, Shenango Township,
17Wheatland Borough, Project ID 98022

 

18Project Allocation

2,752,000

19(Base Project Allocation - $2,701,000)

 

20(Design & Contingencies - $51,000)

 

21(16) SR 0058, Intersection
22Improvements/Congestion Reduction, SR
230058 (Main Street/Center Street) from
24Elm Street to Walnut Street and SR
250173 from SR 0058 to Pine Street,
26Grove City Borough, Project ID 94749

 

27Project Allocation

187,000

28(Base Project Allocation - $176,000)

 

29(Land Allocation - $11,000)

 

30(17) SR 3008, Reconstruction, SR 3008

 

1(Irvine Avenue/State Street), Cities
2of Hermitage and Sharon, Project ID
397911

 

4Project Allocation

1,500,000

5(Base Project Allocation - $1,500,000)

 

6(18) SR 3006, Restoration/Resurface, SR
73006 (Roemer Boulevard) from SR 0718
8(Broadway Avenue) to SR 0518, City of
9Farrell, Project ID 98026

 

10Project Allocation

220,000

11(Base Project Allocation - $170,000)

 

12(Design & Contingencies - $50,000)

 

13(19) SR 0173, Highway Portion Bridge
14Replacement with Intersection
15Improvements, SR 0173 (Slippery Rock
16Road) Bridge over Swamp Run, Pine
17Township, Project ID 89104

 

18Project Allocation

139,000

19(Land Allocation - $52,000)

 

20(Design & Contingencies - $87,000)

 

21(20) SR 0080, Resurface, I-80 (Z H
22Confair Highway) from SR 0019 (Perry
23Highway) at Milepost 15 to SR 2007
24(Springfield Church Road) at Milepost
2521, East Lackawannock and Findley
26Townships, Project ID 87637

 

27Project Allocation

1,562,000

28(Base Project Allocation - $1,362,000)

 

29(Design & Contingencies - $200,000)

 

30(21) SR 0080, Resurface, I-80 (Z H

 

1Confair Highway) from the
2Ohio/Pennsylvania State Line to SR
30019 (Perry Highway), East
4Lackawannock, Lackawannock and
5Shenango Townships, Project ID 91569

 

6Project Allocation

11,115,000

7(Base Project Allocation -
8$11,115,000)

 

9(22) SR 0718, Retaining Wall to Correct
10an Active Slide, SR 0718 (Water
11Avenue), City of Sharon, Project ID
1297046

 

13Project Allocation

750,000

14(Base Project Allocation - $750,000)

 

15(23) SR 0475, Highway Restoration,
16Restoration, SR 0058 (Main Street)
17from Main Street to Main Street
18Extension, Pine Township, Project ID
1983024

 

20Project Allocation

880,000

21(Base Project Allocation - $880,000)

 

22(24) SR 0208, Intersection Improvements,
23SR 0208 at the Intersection of George
24Junior Road, Pine Township, Project ID
2597909

 

26Project Allocation

1,500,000

27(Base Project Allocation - $1,500,000)

 

28(25) SR 0846, Slide Correction/Shoulder
29Failure, SR 0846 (Saranac Drive),
30South Pymatuming Township, Project ID

 

197667

 

2Project Allocation

900,000

3(Base Project Allocation - $900,000)

 

4(26) SR 3016, Restoration/Resurfacing, SR
53016 (Hazen Road) from Tenth Street to
6Mercer Avenue, Sharpsville Borough,
7Project ID 98024

 

8Project Allocation

153,000

9(Base Project Allocation - $103,000)

 

10(Design & Contingencies - $50,000)

 

11(27) SR 0846, Safety Improvement, SR 0846
12(River Road/Orangeville Road) from
13Water Avenue to Clarksville Street,
14Greenville Borough, City of Hermitage,
15Pymatuning, South Pymatuming and West
16Salem Townships, Project ID 97914

 

17Project Allocation

5,000,000

18(Base Project Allocation - $5,000,000)

 

19(28) SR 0062, Highway Restoration, SR
200062 (Sharon Mercer Road), SR 0158
21(Mercer Road), and SR 0258 (Butler
22Pike), East Lackawannock, Findley,
23French Creek and Jefferson Townships,
24Mercer Borough, Springfield Township,
25Project ID 97869

 

26Project Allocation

3,781,000

27(Base Project Allocation - $3,781,000)

 

28(29) SR 3011, Restoration/Resurface, SR
293011 (Keel Ridge Road) from SR 0318 to
30Valley View Road, City of Hermitage,

 

1Shenango Township, Project ID 97913

 

2Project Allocation

1,600,000

3(Base Project Allocation - $1,600,000)

 

4(30) SR 0018, Restoration, Mill, Overlay
5and ADA Ramps, SR 0018 (Main Street)
6from SR 0358 (West Main Street) Hill
7to the West Side of Greenville, and SR
80358 (Main Street) from SR 4004 to SR
90018, Greenville Borough, West Salem
10Township, Project ID 94768

 

11Project Allocation

173,000

12(Base Project Allocation - $173,000)

 

13(31) SR 0019, Retaining Wall to Correct a
14Slide, SR 0019 (Perry Highway), Perry
15Township, Project ID 97047

 

16Project Allocation

500,000

17(Base Project Allocation - $500,000)

 

18(32) SR 0062, Restoration/Resurface, SR
190062 (Shenango Valley Expressway/State
20Street) from SR 3008 (State Street) to
21SR 3011, City of Hermitage, Project ID
2297902

 

23Project Allocation

150,000

24(Base Project Allocation - $150,000)

 

25(33) SR 0376, Resurface, I-376 (Beaver
26Valley Expressway) from the I-80
27Interchange to the Mercer/Lawrence
28County Line, Shenango Township,
29Project ID 94793

 

30Project Allocation

2,000,000

1(Base Project Allocation - $2,000,000)

 

2(34) SR 0173, Resurface/Restoration, SR
30173 (Sandy Lake Road) from SR 0965 to
4SR 1004, Sandy Lake and Worth
5Townships, Project ID 98397

 

6Project Allocation

1,000,000

7(Base Project Allocation - $1,000,000)

 

8(35) SR 1002, Resurface/Restoration, SR
91002 (Mill Street/Fredonia Road) from
10SR 4025 to SR 0019, Fairview Township,
11Fredonia Borough, Project ID 98511

 

12Project Allocation

424,000

13(Base Project Allocation - $424,000)

 

14(36) SR 0760, Widen/Reconstruction, SR
150760 (Broadway Avenue) from SR 0018 to
16Council Avenue, City of Hermitage,
17Shenango Township, Wheatland Borough,
18Project ID 98512

 

19Project Allocation

8,000,000

20(Base Project Allocation - $8,000,000)

 

21(37) SR 0058, Resurface/Restoration, SR
220058 (Kinsman Road/Gibson Street) from
23the Ohio State Line to SR 0322, Greene
24Township, Jamestown Borough, Project
25ID 98440

 

26Project Allocation

1,191,000

27(Base Project Allocation - $1,191,000)

 

28(38) SR 0019, Resurface/Restoration, SR
290019 (Perry Highway) from the Sandy
30Creek Township Line to SR 1014, Sandy

 

1Creek Township, Sheakleyville Borough,
2Project ID 98431

 

3Project Allocation

812,000

4(Base Project Allocation - $812,000)

 

5(39) SR 0062, Resurface/Restoration, SR
60062 (Franklin Road) from SR 0019 to
7Airport Road, Coolspring Township,
8Project ID 98414

 

9Project Allocation

556,000

10(Base Project Allocation - $556,000)

 

11(40) SR 0358, Resurface/Restoration, SR
120358 (Hadley Road) from SR 0019 to
13Carpenter Road, New Vernon and Perry
14Townships, Project ID 98405

 

15Project Allocation

1,150,000

16(Base Project Allocation - $1,150,000)

 

17(41) SR 0018, Rehabilitation/Restoration
18and Corridor Safety Improvements, SR
190018 (Hermitage Road) from Wynnwood
20Drive to Edgewood Drive, Clark
21Borough, City of Hermitage, Pymatuning
22and South Pymatuning Townships,
23Project ID 98384

 

24Project Allocation

6,000,000

25(Base Project Allocation - $6,000,000)

 

26(42) SR 2005, Resurface/Restoration, SR
272005 (Irishtown Road) from SR 0208 to
28SR 2007, Pine Township, Project ID
2998399

 

30Project Allocation

1,439,000

1(Base Project Allocation - $1,439,000)

 

2(43) SR 0080, Adding Parking for I-80
3Closures, I-80 (Z H Confair Highway)
4Welcome Center, Shenango Township,
5Project ID 98385

 

6Project Allocation

6,000,000

7(Base Project Allocation - $6,000,000)

 

8(44) SR 0173, Resurface/Restoration, SR
90173 (Slippery Rock Road/Liberty
10Street) from the Butler County Line to
11Liberty Street, Liberty and Pine
12Townships, Project ID 98393

 

13Project Allocation

597,000

14(Base Project Allocation - $597,000)

 

15(45) SR 3026, Resurface/Restoration, SR
163026 (Bestwick Road) from SR 0318 to
17SR 0062 (Sharon Road), East
18Lackawannock Township, Project ID
1998391

 

20Project Allocation

737,000

21(Base Project Allocation - $737,000)

 

22(46) SR 3003, Resurface/Restoration, SR
233003 (Bedford Road/Wheatland Road)
24from SR 4009 to Sieg Hill Road,
25Shenango Township, West Middlesex
26Borough, Project ID 98390

 

27Project Allocation

1,447,000

28(Base Project Allocation - $1,447,000)

 

29(47) SR 0080, Resurface/Restoration,
30Interstate 80 (Z H Confair Highway)

 

1from Milepost 15 to Milepost 21.5,
2East Lackawannock, Findley and Pine
3Townships, Project ID 98389

 

4Project Allocation

8,000,000

5(Base Project Allocation - $8,000,000)

 

6(48) SR 3020, Reconstruction, SR 3020
7(Lamor Road) from the Joy Cone
8Facility to North Keel Ridge Road,
9City of Hermitage, Project ID 98388

 

10Project Allocation

1,750,000

11(Base Project Allocation - $1,750,000)

 

12(49) SR 0208, Reconstruction and
13Intersection Improvements, SR 0208
14(Center Street/North Street) at the
15Intersection with SR 0173, Grove City
16Borough, Project ID 98387

 

17Project Allocation

500,000

18(Base Project Allocation - $500,000)

 

19(50) SR 0018, Resurface/Restoration, SR
200018 (College Avenue/Conneaut Lake
21Road) from College Avenue to Packard
22Avenue, Greenville Borough, Hempfield
23Township, Project ID 98401

 

24Project Allocation

300,000

25(Base Project Allocation - $300,000)

 

26(51) SR 2021, Resurface, SR 2021
27(Hendersonville Road) from Sandy Lake
28to SR 0965, Sandy Lake Borough, Sandy
29Lake and Worth Townships, Project ID
3099871

 

1Project Allocation

1,100,000

2(Base Project Allocation - $1,100,000)

 

3(52) SR 2001, Resurface, SR 2001 (New
4Castle-Mercer Road) from Highland
5Avenue to SR 0019, East Lackawannock,
6Springfield and Wilmington Townships,
7Project ID 99970

 

8Project Allocation

1,334,000

9(Base Project Allocation - $1,334,000)

 

10(53) SR 0173, Resurface, SR 0173 (Main
11Street/Mercer Street) from Lake Street
12to Gordon Road, Mill Creek Township,
13New Lebanon and Sandy Lake Boroughs,
14Sandy Lake Township, Project ID 100019

 

15Project Allocation

1,447,000

16(Base Project Allocation - $1,447,000)

 

17(54) I-376, Reconstruction, I-376 from
18the Lawrence County Line to its
19Northern Terminus at I-80, Various
20Municipalities, Project ID 0

 

21Project Allocation

17,200,000

22(Base Project Allocation -
23$17,200,000)

 

24(55) SR 0258, Resurface, SR 0258 (Butler
25Pike/Pitt Street) from the Mercer
26County Line to SR 0208, East
27Lackawannock and Findley Townships,
28Mercer Borough, Springfield Township,
29Project ID 99916

 

30Project Allocation

1,500,000

1(Base Project Allocation - $1,500,000)

 

2(56) SR 3018, Resurface, SR 3018 (Walnut
3Street) from Buckeye Drive to Walnut
4Street with Coordination with
5Consolidated Rail Corporation (DOT
6#545037w), South Pymatuming Township,
7Project ID 99918

 

8Project Allocation

300,000

9(Base Project Allocation - $300,000)

 

10(57) SR 3008, Intersection
11Improvement/Pedestrian Facilities, SR
123008 (State Street) at the
13Intersection of Kerrwood Drive and
14Ellis Avenue, City of Hermitage,
15Project ID 102554

 

16Project Allocation

280,000

17(Base Project Allocation - $180,000)

 

18(Land Allocation - $20,000)

 

19(Design & Contingencies - $80,000)

 

20(58) SR 0058, Resurface, SR 0058 (Mercer
21Street/Greenville Road) from SR 4024
22to SR 0019 with Coordination with
23Bessemer and Lake Erie Railroad (DOT
24#051967m), Coolspring, Delaware,
25Hempfield and Jefferson Townships,
26Mercer Borough, Project ID 99869

 

27Project Allocation

3,700,000

28(Base Project Allocation - $3,700,000)

 

29(59) SR 0358, Resurface, SR 0358 (Hadley
30Road) from Irish Ridge Road to Billy

 

1Boyd Road, New Vernon Township,
2Project ID 99924

 

3Project Allocation

500,000

4(Base Project Allocation - $500,000)

 

5(60) SR 0018, Resurface, SR 0018
6(Hermitage Road) from Wilson Road to
7the Shenango Valley Freeway, City of
8Hermitage, Shenango Township, Project
9ID 99883

 

10Project Allocation

1,600,000

11(Base Project Allocation - $1,600,000)

 

12(61) SR 0718, Resurface, SR 0718 (Water
13Avenue/Ivanohoe Road) from Russell
14Street to Hartford Road, Cities of
15Hermitage and Sharon, South Pymatuming
16Township, Project ID 99936

 

17Project Allocation

1,444,000

18(Base Project Allocation - $1,444,000)

 

19(62) I-80, Reconstruction, I-80 from the
20Ohio State Line to the Venango County
21Line, Various Municipalities, Project
22ID 0

 

23Project Allocation

111,000,000

24(Base Project Allocation -
25$111,000,000)

 

26(63) SR 3021, Resurface, SR 3021 (Forker
27Boulevard/10th Street) from Highland
28Avenue to SR 0518, Cities of Hermitage
29and Sharon, Sharpsville Borough,
30Project ID 99943

 

1Project Allocation

394,000

2(Base Project Allocation - $394,000)

 

3(64) SR 0551, Resurface, SR 0551 (Pulaski
4Road) from Pulaski Road to New Castle
5Road, Shenango Township, Project ID
699966

 

7Project Allocation

759,000

8(Base Project Allocation - $759,000)

 

9(65) SR 0418, Resurface, SR 0418 (Mercer
10Avenue) from Buhl Farm Drive to Maple
11Drive, City of Hermitage, Project ID
1299961

 

13Project Allocation

300,000

14(Base Project Allocation - $300,000)

 

15(66) SR 3035, Resurface, SR 3035 (Maple
16Drive) from SR 0418 to SR 3008 (State
17Street), City of Hermitage, Project ID
1899951

 

19Project Allocation

500,000

20(Base Project Allocation - $500,000)

 

21(67) SR 0518, Resurface, SR 0518 (Main
22Street/Walnut Street) from Main Street
23to Pierce Bluff Drive, City of
24Hermitage, Sharpsville Borough,
25Project ID 99927

 

26Project Allocation

500,000

27(Base Project Allocation - $500,000)

 

28(68) SR 4006, Resurface, SR 4006
29(Williamson Road) from Williamson Road
30to SR 0018 with Railroad Coordination

 

1with Norfolk and Southern Railroads
2(DOT #262733s) and Bessemer and Lake
3Erie Railroads (DOT #051958n),
4Hempfield Township, Project ID 99954

 

5Project Allocation

300,000

6(Base Project Allocation - $300,000)

 

7(69) SR 3024, Resurface, SR 3024
8(Delaware Road/Main Street) from
9Mercer Road to Constitution Road with
10Coordination with Bessemer and Lake
11Erie Railroads (DOT #051806s),
12Delaware and Fairview Townships,
13Fredonia Borough, Project ID 99921

 

14Project Allocation

750,000

15(Base Project Allocation - $750,000)

 

16(70) SR 0358, Resurface, SR 0358 (Hadley
17Road) from Methodist Road to Bean
18Road, Hempfield, Otter Creek and Perry
19Townships, Project ID 99873

 

20Project Allocation

1,300,000

21(Base Project Allocation - $1,300,000)

 

22(71) SR 0058, Resurface, SR 0058 (Main
23Street Extension/Main Street) from
24Wal-Mart Drive to Campbell Drive,
25Grove City Borough, Pine Township,
26Project ID 100030

 

27Project Allocation

671,000

28(Base Project Allocation - $671,000)

 

29(72) I-79, Reconstruction, I-79 from the
30Lawrence County Line to the Crawford

 

1County Line, Various Municipalities,
2Project ID 0

 

3Project Allocation

104,400,000

4(Base Project Allocation -
5$104,400,000)

 

6(73) SR 0018, Resurface, SR 0018 (New
7Castle Road/Hermitage Road) from Roman
8Road to Wilson Road, City of
9Hermitage, Shenango Township, West
10Middlesex Borough, Project ID 99878

 

11Project Allocation

1,500,000

12(Base Project Allocation - $1,500,000)

 

13(74) Various State Routes, Safety
14Improvement – Roadway Departure
15Implementation Plan (RDIP), Various
16State Routes in Various
17Municipalities, Various
18Municipalities, Project ID 102100

 

19Project Allocation

30,000

20(Base Project Allocation - $30,000)

 

21(75) Various State Routes, Safety
22Improvement – Intersection Safety
23Implementation Plan (ISIP), Various
24State Routes, Various Municipalities,
25Project ID 102083

 

26Project Allocation

30,000

27(Base Project Allocation - $30,000)

 

28Section 344. Mifflin County.

29Projects are as follows:

 

30(1) (Reserved).

 

1(2) SR 0522, Safety Improvement, SR 0522,
2Segments 0080/1057 to 0080/1107,
3Lewistown Borough, Project ID 91936

 

4Project Allocation

300,000

5(Base Project Allocation - $200,000)

 

6(Design & Contingencies - $100,000)

 

7(3) SR 0022, Highway Restoration, SR 0022
8Huntingdon County Line to 4 Lane End,
9SR 0747 to 4 Lane, Wayne Township,
10Project ID 88328

 

11Project Allocation

400,000

12(Base Project Allocation - $300,000)

 

13(Design & Contingencies - $100,000)

 

14(4) SR 3022, Highway Portion Bridge
15Replacement, SR 3002 over
16Kishacoquillas Creek, Lewistown
17Borough, Project ID 88221

 

18Project Allocation

194,000

19(Base Project Allocation - $126,000)

 

20(Land Allocation - $42,000)

 

21(Design & Contingencies - $26,000)

 

22(5) SR 1012, Highway Portion Bridge
23Replacement, SR 1012 over Laurel Run,
24near Milroy, Armagh Township, Project
25ID 91608

 

26Project Allocation

281,000

27(Base Project Allocation - $281,000)

 

28(6) SR 1005, Safety Improvements, SR 1005
29from Lewistown to Milroy, Various
30Municipalities, Project ID 95842

 

1Project Allocation

1,850,000

2(Base Project Allocation - $1,500,000)

 

3(Land Allocation - $50,000)

 

4(Design & Contingencies - $300,000)

 

5(7) Industrial Park Access Road, Roadway
6Construction, Mifflin County
7Industrial Park, Granville Township,
8Project ID 74974

 

9Project Allocation

276,000

10(Base Project Allocation - $125,000)

 

11(Land Allocation - $51,000)

 

12(Design & Contingencies - $100,000)

 

13(8) SR 3004, Safety Improvement, SR 3004,
14Segments 0050/0367 to 0050/1584,
15Granville Township, Project ID 91938

 

16Project Allocation

300,000

17(Base Project Allocation - $200,000)

 

18(Design & Contingencies - $100,000)

 

19(9) SR 0522, Resurface, SR 0522,
20Lewistown to the Snyder County Line,
21Segments 0190/0000 to 0360/2769,
22Decatur Township, Project ID 72767

 

23Project Allocation

1,000,000

24(Base Project Allocation - $1,000,000)

 

25(10) SR 2004, Safety Improvement, SR
262004, Segments 0060/2432 to 0070/1075,
27Derry Township, Project ID 91937

 

28Project Allocation

300,000

29(Base Project Allocation - $200,000)

 

30(Design & Contingencies - $100,000)

 

1(11) SR 0655, Safety Improvement, SR
20655, Segments 0210/1587 to 0220/1026,
3Union Township, Project ID 91935

 

4Project Allocation

300,000

5(Base Project Allocation - $200,000)

 

6(Design & Contingencies - $100,000)

 

7(12) SR 0022, Mile Marker Signing
8Installation, Signing, SR 0022 SR 0322
9and I-80, Various Municipalities in
10Mifflin, Juniata and Clinton Counties,
11Project ID 89241

 

12Project Allocation

325,000

13(Base Project Allocation - $325,000)

 

14(13) SR 0995, Safety Improvements, SR
150022, Segments 0020/0317 to 0060/1601,
16Wayne Township, Project ID 88255

 

17Project Allocation

400,000

18(Base Project Allocation - $100,000)

 

19(Land Allocation - $100,000)

 

20(Design & Contingencies - $200,000)

 

21(14) SR 1005, Congestion Improvement, SR
221005 (Market Street) and 3rd Street,
23Segments 0010/0000 to 0030/0000,
24Lewistown Borough, Project ID 93307

 

25Project Allocation

1,050,000

26(Base Project Allocation - $619,000)

 

27(Land Allocation - $50,000)

 

28(Design & Contingencies - $381,000)

 

29(15) SR 0322, Highway Paving, SR 0322,
30Seven Mountains, Segments/Offset

 

10040/0000 to 0082/0000, 0041/0000 to
20083/0000, Armagh Township, Project ID
393311

 

4Project Allocation

442,000

5(Base Project Allocation - $361,000)

 

6(Land Allocation - $20,000)

 

7(Design & Contingencies - $61,000)

 

8(16) SR 0322, Highway Resurfacing, SR
90322 from Reedsville to Burnham,
10Segments/Offset 0190/2318 to
110270/1512, 0191/2298 to 0271/1256,
12Brown and Derry Townships, Project ID
1393312

 

14Project Allocation

1,322,000

15(Base Project Allocation - $1,201,000)

 

16(Land Allocation - $31,000)

 

17(Design & Contingencies - $90,000)

 

18(17) SR 0655, Resurface, SR 0655 County
19Line to Belleville, Segments 0010/0000
20to 0170/0000, Menno and Union
21Townships, Project ID 81491

 

22Project Allocation

51,000

23(Base Project Allocation - $51,000)

 

24(18) SR 1005, Highway Portion Bridge
25Replacement, SR 1005 Tea Creek Bridge
26BMS 44-1005-0160-0920, Brown Township,
27Project ID 81529

 

28Project Allocation

120,000

29(Base Project Allocation - $120,000)

 

30(19) SR0022, Highway Resurfacing, SR

 

10022, Segments/Offset 0532/1646 to
20602/0000, 0533/1114 to 0602/0000, SR
30322, Segments/Offset 0220/2937 to
40270/1512, 0221/2907 to 0271/1256,
5Derry Township, Lewistown Borough,
6Project ID 93313

 

7Project Allocation

1,000,000

8(Base Project Allocation - $900,000)

 

9(Land Allocation - $20,000)

 

10(Design & Contingencies - $80,000)

 

11(20) SR 0210, Highway Restoration, SR
124013, Segments 0200/0000 to 0210/2573,
13Derry Township, Burnham Borough,
14Project ID 88308

 

15Project Allocation

500,000

16(Base Project Allocation - $500,000)

 

17(21) SR 0022, Highway Resurfacing, SR
180022, McVeytown to Strodes Mills,
19Segments/Offset 0260/0490 to
200432/0753, Granville and Oliver
21Townships, Project ID 93314

 

22Project Allocation

1,432,000

23(Base Project Allocation - $1,301,000)

 

24(Land Allocation - $40,000)

 

25(Design & Contingencies - $91,000)

 

26(22) SR 1005, Highway Resurfacing, SR
271005, SR 3001, SR 3002, SR 3006,
28Segments/Offset 0010/0000 to
290050/0177, 0010/0000 to 0060/0000,
300080/0000 to 0100/0000, 0010/0000 to

 

10040/0000, Derry Township, Lewistown
2Borough, Project ID 93316

 

3Project Allocation

1,400,000

4(Base Project Allocation - $1,200,000)

 

5(Land Allocation - $120,000)

 

6(Design & Contingencies - $80,000)

 

7(23) SR 0522, Resurface, US 522, SR 1017
8to Guss Road, Segments 0072/0000 to
90190/0000, Decatur and Derry
10Townships, Lewistown Borough, Project
11ID 100409

 

12Project Allocation

2,683,000

13(Base Project Allocation - $2,683,000)

 

14(24) SR 0022, Betterment (Restoration),
15US 22, Derry, Granville and Wayne
16Townships, Project ID 101894

 

17Project Allocation

7,901,000

18(Base Project Allocation - $7,750,000)

 

19(Design & Contingencies - $151,000)

 

20(25) SR 0103, Resurface, SR 0103, Pine
21Glen Road to Snooks Hill Road,
22Segments 0350/0000 to 0450/0000,
23Bratton and Granville Townships,
24Project ID 100379

 

25Project Allocation

1,606,000

26(Base Project Allocation - $1,606,000)

 

27(26) SR 1005, Resurface, SR 1005, SR 4013
28to Manning's Narrows Road, Segments
290070/0000 to 0112/1200 Brown Township,
30Burnham Borough, Derry Township,

 

1Project ID 100386

 

2Project Allocation

1,349,000

3(Base Project Allocation - $1,349,000)

 

4(27) SR 0333, Betterment (Restoration),
5PA 333, Granville Township, Project ID
6101893

 

7Project Allocation

2,757,000

8(Base Project Allocation - $2,606,000)

 

9(Design & Contingencies - $151,000)

 

10(28) SR 1005, Resurface, SR 1005,
11Colonial Drive to Filter Plant Road,
12Segments 0210/0642 to 0270/0315,
13Armagh Township, Project ID 100389

 

14Project Allocation

1,000,000

15(Base Project Allocation - $1,000,000)

 

16(29) SR 3002, Betterment (Restoration),
17SR 3002 (Business US 22), Granville
18Township, Lewistown Borough, Project
19ID 101897

 

20Project Allocation

2,155,000

21(Base Project Allocation - $2,005,000)

 

22(Design & Contingencies - $150,000)

 

23(30) SR 1001, Betterment (Restoration),
24SR 1000 Quad Routes, Armagh and Brown
25Townships, Burnham Borough, Derry
26Township, Lewistown Borough, Project
27ID 101955

 

28Project Allocation

15,675,000

29(Base Project Allocation -
30$15,525,000)

 

1(Design & Contingencies - $150,000)

 

2(31) SR 0103, Betterment (Restoration),
3PA 0103, Bratton and Wayne Townships,
4Project ID 101892

 

5Project Allocation

2,726,000

6(Base Project Allocation - $2,576,000)

 

7(Design & Contingencies - $150,000)

 

8(32) SR 0103, Resurface, SR 0103, Snooks
9Hill Road to Lewistown, Segments
100220/0000 to 0350/0000, Bratton
11Township, Project ID 100397

 

12Project Allocation

2,435,000

13(Base Project Allocation - $2,435,000)

 

14(33) SR 0655, Resurface, SR 0655, SR 4005
15to Interchange, Segments 0170/0000 to
160320/0000, Brown and Union Townships,
17Project ID 100405

 

18Project Allocation

2,598,000

19(Base Project Allocation - $2,598,000)

 

20(34) SR 0103, Resurface, PA 103 to
21Juniata County, Segments 0010/0000 to
220120/0227, Wayne Township, Project ID
23100415

 

24Project Allocation

2,771,000

25(Base Project Allocation - $2,771,000)

 

26(35) SR 0103, Resurface, SR 1003, North
27River Road to SR 1005, Segments
280490/0000 to 0556/1635, Granville,
29Juniata Terrace and Lewistown
30Boroughs, Project ID 100438

 

1Project Allocation

1,340,000

2(Base Project Allocation - $1,340,000)

 

3(36) SR 2001, Betterment (Restoration),
4SR 2000 Quad Routes, Burnham Borough,
5Decatur and Derry Townships and
6Lewistown Borough, Project ID 101956

 

7Project Allocation

17,582,000

8(Base Project Allocation -
9$17,431,000)

 

10(Design & Contingencies - $151,000)

 

11(37) SR 3003, Betterment (Restoration),
12SR 3000 Quad Routes, Derry and
13Granville Townships, Lewistown,
14McVeytown and Newton Hamilton
15Boroughs, Oliver and Wayne Townships,
16Project ID 101973

 

17Project Allocation

8,266,000

18(Base Project Allocation - $8,115,000)

 

19(Design & Contingencies - $151,000)

 

20(38) SR 4001, Betterment (Restoration),
21SR 4000 Quad Routes, Armagh, Brown,
22Derry, Granville, Menno, Oliver, Union
23and Wayne Townships, Project ID 101974

 

24Project Allocation

21,911,000

25(Base Project Allocation -
26$21,761,000)

 

27(Design & Contingencies - $150,000)

 

28(39) SR 0322, Betterment (Restoration),
29US 322, Armagh and Brown Townships,
30Project ID 101895

 

1Project Allocation

5,531,000

2(Base Project Allocation - $5,380,000)

 

3(Design & Contingencies - $151,000)

 

4(40) SR 0103, Resurface, SR 0103, Snooks
5Hill Road to North River Road,
6Segments 0450/0000 to 0490/1509,
7Granville Township, Project ID 100402

 

8Project Allocation

1,000,000

9(Base Project Allocation - $1,000,000)

 

10(41) Various, Highway Portion Bridge
11Preservation, Various State Routes,
12Various Municipalities, Project ID
134585

 

14Project Allocation

1,070,000

15(Base Project Allocation - $1,070,000)

 

16(42) Various, Highway Portion Bridge
17Preservation Activities, Various State
18Routes, Armagh and Brown Townships,
19Burnham Borough, Decatur, Derry,
20Oliver and Wayne Townships, Project ID
2193286

 

22Project Allocation

2,615,000

23(Base Project Allocation - $2,475,000)

 

24(Land Allocation - $40,000)

 

25(Design & Contingencies - $100,000)

 

26Section 345. Monroe County.

27Projects are as follows:

 

28(1) (Reserved).

 

29(2) SR 0033, Resurface, PA 33 from US 209
30to I-80, Hamilton and Stroud

 

1Townships, Project ID 96448

 

2Project Allocation

6,501,000

3(Base Project Allocation - $6,500,000)

 

4(Design & Contingencies - $1,000)

 

5(3) SR 8013, Highway Resurface, Ramps to
6I-80 from PA 33 to I-80, Stroud
7Township, Project ID 96443

 

8Project Allocation

751,000

9(Base Project Allocation - $750,000)

 

10(Design & Contingencies - $1,000)

 

11(4) SR 0903, Highway Portion Bridge
12Replacement, PA 903 over Tributary of
13Tunkhannock Creek, Tunkhannock
14Township, Project ID 96445

 

15Project Allocation

751,000

16(Base Project Allocation - $750,000)

 

17(Design & Contingencies - $1,000)

 

18(5) SR 3009, Highway Portion Bridge
19Replacement, SR 3009 over Pohopco
20Creek, Chestnuthill Township, Project
21ID 96447

 

22Project Allocation

601,000

23(Base Project Allocation - $600,000)

 

24(Design & Contingencies - $1,000)

 

25(6) SR 0611, Retaining Wall
26Rehabilitation, PA 611 Retaining Wall
27along Delaware River, Delaware Water
28Gap Borough, Project ID 96481

 

29Project Allocation

20,002,000

30(Base Project Allocation -

 

1$20,000,000)

 

2(Land Allocation - $1,000)

 

3(Design & Contingencies - $1,000)

 

4(7) SR 8024, Highway Resurface, Ramps to
5Broad Street (SR 8024) from SR 2030 to
6I-80, Smithfield Township, Project ID
796444

 

8Project Allocation

5,852,000

9(Base Project Allocation - $5,851,000)

 

10(Design & Contingencies - $1,000)

 

11(8) SR 0209, Highway Portion Bridge
12Replacement, US 209 over Appenzell
13Creek, Hamilton Township, Project ID
1491680

 

15Project Allocation

2,501,000

16(Base Project Allocation - $2,500,000)

 

17(Design & Contingencies - $1,000)

 

18(9) SR 0209, Roadway Widening and
19Interchange Improvements, SR 0209 from
20Broadheadsville to Route 115,
21Chestnuthill Township, Project ID
2288935

 

23Project Allocation

1,956,000

24(Base Project Allocation - $1,956,000)

 

25(10) SR 8004, Highway Portion Bridge
26Rehabilitation, SR 0080 Westbound Ramp
27at I-80, I-380 Interchange,
28Tunkhannock Township, Project ID 89630

 

29Project Allocation

602,000

30(Base Project Allocation - $600,000)

 

1(Land Allocation - $1,000)

 

2(Design & Contingencies - $1,000)

 

3(11) SR 0209, Safety Improvements, SR
40209 from Frable Road to Lesh Road,
5Chestnuthill and Hamilton Townships,
6Project ID 95517

 

7Project Allocation

5,850,000

8(Base Project Allocation - $5,850,000)

 

9(Design & Contingencies - $1,100,000)

 

10(12) SR 2012, Corridor Safety
11Improvements, SR 2012 (209 Business)
12from Mount Tom Road Intersection
13(Valhalla Drive), Smithfield Township,
14Project ID 95398

 

15Project Allocation

397,000

16(Base Project Allocation - $397,000)

 

17(13) SR 0080, Highway Reconstruction, I-
1880, Segments 3044 to 3075, East
19Stroudsburg Borough, Stroud Township,
20Stroudsburg Borough, Project ID 76357

 

21Project Allocation

204,344,000

22(Base Project Allocation -
23$192,634,000)

 

24(Land Allocation - $4,155,000)

 

25(Design & Contingencies - $7,555,000)

 

26(14) SR 0209, Highway Resurface, Hamilton
27West (SR 0209) from East of Lesh Road,
28Hamilton Township, Project ID

 

29Project Allocation

4,001,000

30(Base Project Allocation - $4,000,000)

 

1(Design & Contingencies - $1,000)

 

2(15) SR 0209, Safety Improvements, SR
30209 from Mount Nebo Road to Municipal
4Drive, Middle Smithfield Township,
5Project ID 95516

 

6Project Allocation

15,220,000

7(Base Project Allocation -
8$13,260,000)

 

9(Design & Contingencies - $1,960,000)

 

10(16) SR 0209, Intersection Improvements,
11Intersection of SR 0209 and 0715,
12Chestnuthill Township, Project ID
1388934

 

14Project Allocation

692,000

15(Base Project Allocation - $692,000)

 

16(17) SR 0209, Safety Improvements, SR
170209 from Gilbert Road at Traffic
18Signal to Leslie Road, Chestnuthill
19Township, Project ID 95518

 

20Project Allocation

11,880,000

21(Base Project Allocation -
22$10,780,000)

 

23(Design & Contingencies - $1,100,000)

 

24(18) SR 8007, Highway Resurface,
25Interchange Ramps from US 209 to SR
262012, Hamilton Township, Project ID
2796440

 

28Project Allocation

1,001,000

29(Base Project Allocation - $1,000,000)

 

30(Design & Contingencies - $1,000)

 

1(19) SR 9400, Highway Resurface, PA 314
2Ramps (SR 9400) from PA 940 to PA 314,
3Mount Pocono Borough, Project ID 96439

 

4Project Allocation

751,000

5(Base Project Allocation - $750,000)

 

6(Design & Contingencies - $1,000)

 

7(20) SR 1007, Highway Portion Bridge
8Replacement, SR 1007 over Marshalls
9Creek, Middle Smithfield Township,
10Project ID 89615

 

11Project Allocation

1,702,000

12(Base Project Allocation - $1,700,000)

 

13(Land Allocation - $1,000)

 

14(Design & Contingencies - $1,000)

 

15(21) SR 0715, Intersection Improvements,
16SR 0715/0611 Intersection, Pocono
17Township, Project ID 79473

 

18Project Allocation

9,503,000

19(Base Project Allocation - $5,501,000)

 

20(Land Allocation - $2,001,000)

 

21(Design & Contingencies - $2,001,000)

 

22(22) SR 0209, Highway Resurfacing,
23Hamilton West (SR 0209) from PA 33 to
24I-80, Hamilton and Stroud Townships,
25Project ID 96442

 

26Project Allocation

9,502,000

27(Base Project Allocation - $9,501,000)

 

28(Design & Contingencies - $1,000)

 

29(23) SR 0080, ITS Devices, I-80, US 209
30and PA 33, Delaware Water Gap Borough,

 

1East Stroudsburg Borough, Hamilton,
2Pocono, Smithfield and Stroud
3Townships, Stroudsburg Borough,
4Project ID 93387

 

5Project Allocation

463,000

6(Base Project Allocation - $225,000)

 

7(Land Allocation - $3,000)

 

8(Design & Contingencies - $235,000)

 

9(24) SR 2030, Highway Resurfacing, Fox
10Hill Road (SR 2030) from Main Street
11to I-80, Delaware Water Gap Borough,
12Smithfield Township, Project ID 95575

 

13Project Allocation

2,102,000

14(Base Project Allocation - $2,101,000)

 

15(Design & Contingencies - $1,000)

 

16(25) SR 0196, Resurface, Route 611 to the
17Wayne County Line, Coolbaugh Township,
18Mount Pocono Borough, Project ID
19101641

 

20Project Allocation

2,550,000

21(Base Project Allocation - $2,500,000)

 

22(Design & Contingencies - $50,000)

 

23(26) SR 0209, Safety Improvement, SR 2012
24(Business 209), Valhalla Drive to
25Airport Road, SR 0209 (US 209), Mount
26Nebo Road to Municipal Drive, SR 0209
27(US 209), Frable Road to Lesh Road, SR
280209 (US 209), Gilbert Road to Leslie
29Drive, East Stroudsburg Borough, Polk
30Township, Project ID 101967

 

1Project Allocation

1,000,000

2(Base Project Allocation - $1,000,000)

 

3(27) SR 0115 and SR 0080, Interchange
4Improvements, SR 0115 and I-80
5Interchange, Tobyhanna Township,
6Project ID 0

 

7Project Allocation

1,500,000

8(Base Project Allocation - $1,500,000)

 

9(28) SR 0115 and SR 0903, Roadway
10Widening, SR 0115, I-80 to SR 0903 and
11SR 0903 from SR 0115 to the Pocono
12Raceway, Long Pond, Tunkhannock
13Township, Project ID 0

 

14Project Allocation

8,000,000

15(Base Project Allocation - $8,000,000)

 

16(29) I-380, Reconstruction, I-380 from
17its Eastern Terminus at I-80 to the
18Wayne County Line, Various
19Municipalities, Project ID 0

 

20Project Allocation

53,000,000

21(Base Project Allocation -
22$53,000,000)

 

23(30) SR 0903, Resurface, Carbon County
24Line to Route 115, Tunkhannock
25Township, Project ID 0

 

26Project Allocation

540,000

27(Base Project Allocation - $500,000)

 

28(Design & Contingencies - $40,000)

 

29(31) I-80, Reconstruction, I-80 from the
30Carbon County Line to the New Jersey

 

1State Line, Various Municipalities,
2Project ID 0

 

3Project Allocation

112,400,000

4(Base Project Allocation -
5$112,400,000)

 

6Section 346. Montgomery County.

7Projects are as follows:

 

8(1) (Reserved).

 

9(2) West Point Pike, Corridor Safety
10Improvement, Park Avenue, Jones
11Avenue, Upper Gwynedd Township,
12Project ID 74815

 

13Project Allocation

301,000

14(Base Project Allocation - $301,000)

 

15(3) SR 0422, Interchange Improvement,
16Evergreen Road Intersection, Lower
17Pottsgrove Township, Project ID 89715

 

18Project Allocation

400,000

19(Base Project Allocation - $400,000)

 

20(4) SR 0076, Restoration, 0076/3270
21through 0076/3391, Various, Project ID
2292583

 

23Project Allocation

15,500,000

24(Base Project Allocation -
25$15,500,000)

 

26(5) PA 63, Intersection Improvement,
27Intersection at Limekiln Pike and
28Norristown Road, Horsham and Upper
29Dublin Townships, Project ID 48174

 

30Project Allocation

17,805,000

1(Base Project Allocation -
2$17,805,000)

 

3(6) SR 0076, Superstructure Replacement,
4West City Interchange, Lower Merion
5Township, Project ID 90099

 

6Project Allocation

246,000

7(Base Project Allocation - $179,000)

 

8(Design & Contingencies - $67,000)

 

9(7) SR 4031 Ridge Pike, Reconstruct,
10Rehabilitate, Widen, Add Left Turn
11Lanes, East of Butler Pike to
12Philadelphia City Line, Whitemarsh
13Township, Project ID 16577

 

14Project Allocation

32,000,000

15(Base Project Allocation -
16$32,000,000)

 

17(8) Route 263, Corridor Safety
18Improvements, Route 263 York Road from
19Horsham Road to Summit Avenue, Hatboro
20Borough, Project ID 74817

 

21Project Allocation

200,000

22(Base Project Allocation - $200,000)

 

23(9) SR 0320, Restoration, 0320/0020
24through 0320/0031, Upper and Lower
25Merion Townships, Project ID 16599

 

26Project Allocation

4,730,000

27(Base Project Allocation - $4,730,000)

 

28(10) SR 0076, Superstructure Replacement,
29Two Miles West of Gladwyne, Lower
30Merion Township, Project ID 90100

 

1Project Allocation

273,000

2(Base Project Allocation - $215,000)

 

3(Design & Contingencies - $58,000)

 

4(11) SR 9102, Road Widening, Traffic
5Signals, Construction of New Connector
6Road, Norristown Borough Line to I-
7276, Norristown Borough, Richland
8Township, Project ID 87392

 

9Project Allocation

3,400,000

10(Base Project Allocation - $3,400,000)

 

11(12) SR 2034, Highway Reconstruction and
12Drainage, SR 2034 Edge Hill Road,
13Tyson Avenue from Jenkinstown Road to
14Easton Road, Abington Township,
15Project ID 57865

 

16Project Allocation

2,600,000

17(Base Project Allocation - $2,600,000)

 

18(13) SR 0476, Interchange Improvement,
19Highway Lighting and Ramp Extension,
20I-76 to Midcounty Interchange,
21Plymouth Township and West Conshohock
22Borough, Project ID 92313

 

23Project Allocation

7,000,000

24(Base Project Allocation - $7,000,000)

 

25(14) SR 3053 Germantown Pike, Safety
26Improvements and Intersection
27Reconstruction Improvements, Corridor
28from SR 3014 Joshua Road to Church
29Road and the Intersection at Church
30Road, Whitemarsh Township, Project ID

 

174937

 

2Project Allocation

640,000

3(Base Project Allocation - $640,000)

 

4(15) SR 0422, Variable Message Signs, US
5202 to the Berks County Line, Various,
6Project ID 86465

 

7Project Allocation

18,500,000

8(Base Project Allocation -
9$18,500,000)

 

10(16) SR 0422, Reconstruct, 0422/0010
11through 0422/0031, West Pottsgrove
12Township, Project ID 84308

 

13Project Allocation

55,000,000

14(Base Project Allocation -
15$55,000,000)

 

16(17) SR 2026, Widening and Intersection
17Improvements, SR 2026, Blair Mill
18Road, Horsham and Upper Moreland
19Townships, Project ID 97894

 

20Project Allocation

400,000

21(Base Project Allocation - $400,000)

 

22(18) SR 9102, Widen, 9102/0250, Upper
23Merion Township, Project ID 79864

 

24Project Allocation

20,911,000

25(Base Project Allocation -
26$20,911,000)

 

27(19) SR 0073, Safety Improvements,
28Roadway Reconstruction, Signal
29Improvements and Intersection
30Improvements, Turning Lanes, PA 73

 

1Church Road, Corridor and
2Intersections with Greenwood Avenue
3and Rices Mill Road, Cheltenham
4Township, Project ID 16334

 

5Project Allocation

7,000,000

6(Base Project Allocation - $7,000,000)

 

7(20) SR 0076, Highway Portion Bridge
8Rehabilitation, I-76 over Mill Creek
9and Mill Creek Road, Lower Merion
10Township, Project ID 91571

 

11Project Allocation

568,000

12(Base Project Allocation - $447,000)

 

13(Design & Contingencies - $121,000)

 

14(21) I-476, Reconstruction, I-476 from
15the Delaware County Line to the
16Pennsylvania Turnpike Northeast
17Extension, Various Municipalities,
18Project ID 0

 

19Project Allocation

22,000,000

20(Base Project Allocation -
21$22,000,000)

 

22(22) SR 0232, Resurface, Huntingdon Pike
23(SR 0232) from Rockledge Borough Line
24to SR 0063, Rockledge Borough,
25Abington, Upper Moreland and Horsham
26Townships, Project ID 102377

 

27Project Allocation

2,220,000

28(Base Project Allocation - $2,200,000)

 

29(Design & Contingencies - $20,000)

 

30(23) I-76, Reconstruction, I-76 from the

 

1Pennsylvania Turnpike to the
2Philadelphia City Line, Various
3Municipalities, Project ID 0

 

4Project Allocation

50,000,000

5(Base Project Allocation -
6$50,000,000)

 

7(24) SR 0029, New Alignment, New
8Connections and Intersections for New
92nd Collegeville Bridge Crossing over
10Perkiomen Creek between Ridge Pike and
11Germantown Pike, Collegeville Borough,
12Lower Providence Township, Project ID
13102273

 

14Project Allocation

29,372,000

15(Base Project Allocation -
16$29,372,000)

 

17(25) SR 0611, Resurface, SR 0611 from the
18Philadelphia County Line to the Bucks
19County Line, Cheltenham Township,
20Jenkintown Borough, Abington, Upper
21Moreland and Horsham Townships,
22Project ID 102376

 

23Project Allocation

7,520,000

24(Base Project Allocation - $7,500,000)

 

25(Design & Contingencies - $20,000)

 

26(26) Various, Corridor Safety
27Improvement, Various State Owned
28Routes, Whitemarsh Township, Project
29ID 74816

 

30Project Allocation

1,200,000

1(Base Project Allocation - $1,200,000)

 

2Section 347. Montour County.

3Projects are as follows:

 

4(1) (Reserved).

 

5(2) SR 0011, Highway Portion Bridge
6Replacement, US 11 over Sechler Run,
7BMS 47-0011-0150-1710, Cooper
8Township, Project ID 97643

 

9Project Allocation

1,323,000

10(Base Project Allocation - $1,021,000)

 

11(Land Allocation - $101,000)

 

12(Design & Contingencies - $201,000)

 

13(3) SR 0011, Highway Portion Bridge
14Replacement, US 11 over Tributary of
15Sechler Run, BMS 47-0011-0150-0000,
16Cooper Township, Project ID 97641

 

17Project Allocation

1,323,000

18(Base Project Allocation - $1,021,000)

 

19(Land Allocation - $101,000)

 

20(Design & Contingencies - $201,000)

 

21(4) SR 0054, Corridor Safety Improvement
22with Intersections Improvements,
23Intersections of SR 0054, and SR 3009
24(Old Valley School Road), SR 0054 and
25SR 0642, SR/Segments/Offset
2654/0210/0000 and SR 3009/0010/3707,
2754/0230/0000 and SR 0642/0170/3587,
28Valley Township, Project ID 91643

 

29Project Allocation

327,000

30(Base Project Allocation - $327,000)

 

1(5) SR 0642, Mill and Resurface, SR 0642
2from I-80 to Mahoning Creek Valley,
3Segments 0180/0125 to 0260/0553,
4Derry, Valley and West Hemlock
5Township, Project ID 87901

 

6Project Allocation

3,637,000

7(Base Project Allocation - $3,589,000)

 

8(Design & Contingencies - $48,000)

 

9(6) SR 1003, Resurface, SR 1003 (PP&L
10Road) from SR 1002 (Strawberry Ridge
11Road) to PA 44, Anthony and Derry
12Townships, Project ID 97819

 

13Project Allocation

650,000

14(Base Project Allocation - $650,000)

 

15(7) SR 0254, Highway Reconstruction, SR
160254 from Cromley Road to Columbia
17County Line, Derry Township, Project
18ID 88939

 

19Project Allocation

525,000

20(Base Project Allocation - $525,000)

 

21(8) SR 0080, Roadway Restoration, I-80
22East Bound from Creek Road to SR 0054,
23Includes Bridge Work over Creek Road,
24Chillisquaque Creek and Narehood Road,
25SR 0080 Segments/Offset 2164/1650 to
262230/2642, Liberty and Valley
27Townships, Project ID 91451

 

28Project Allocation

719,000

29(Base Project Allocation - $689,000)

 

30(Design & Contingencies - $30,000)

 

1(9) SR 0054, Highway Portion Bridge
2Replacement, SR 0054 over Stony Brook,
3Derry Township, Project ID 93524

 

4Project Allocation

1,129,000

5(Base Project Allocation - $940,000)

 

6(Land Allocation - $157,000)

 

7(Design & Contingencies - $32,000)

 

8(10) SR 0254, Resurface, PA 254 from PA
954 (Continental Boulevard) to Mud
10Creek, Segments 0110/0000 to
110120/2612, Derry Township, Project ID
1297809

 

13Project Allocation

200,000

14(Base Project Allocation - $200,000)

 

15(11) SR 0642, Mill and Resurface, SR 0642
16from the Northumberland County Line to
17SR 0045, Segments 0010/0000 to
180060/3296, Liberty Township, Project
19ID 87898

 

20Project Allocation

2,506,000

21(Base Project Allocation - $2,456,000)

 

22(Design & Contingencies - $50,000)

 

23(12) SR 0080, Roadway Rehabilitation, I-
2480 from the Northumberland County Line
25to Mauses Creek I-80, Segments
262164/1650 to 2230/2642, Liberty and
27Valley Townships, Project ID 97656

 

28Project Allocation

7,956,000

29(Base Project Allocation - $7,755,000)

 

30(Design & Contingencies - $201,000)

 

1(13) SR 0642, Mill and Resurface Roadway,
2SR 0642 from Mahoning Creek to the
3Columbia County Line, Segments
40260/0553 to 0290/3203, West Hemlock
5Township, Project ID 87903

 

6Project Allocation

1,491,000

7(Base Project Allocation - $1,471,000)

 

8(Design & Contingencies - $20,000)

 

9(14) SR 0254, Resurface, SR 0254 from the
10Northumberland County Line to
11Laidacker Road, Segments/Offset
120010/0000 to 0060/1368, Limestone
13Township, Project ID 88940

 

14Project Allocation

3,005,000

15(Base Project Allocation - $2,917,000)

 

16(Design & Contingencies - $88,000)

 

17(15) SR 0254, Highway Portion Bridge
18Replacement, SR 0254 over Limestone
19Run, Limestone Township, Project ID
206387

 

21Project Allocation

366,000

22(Base Project Allocation - $166,000)

 

23(Land Allocation - $100,000)

 

24(Design & Contingencies - $100,000)

 

25(16) SR 0080, Concrete Patching, Joint
26Sealing, Diamond Grinding, I-80 from
27SR 3013 to SR 3006, Liberty Township,
28I-80, Segments 2165/1650 to 2230/2642,
29Liberty Township, Project ID 97547

 

30Project Allocation

852,000

1(Base Project Allocation - $801,000)

 

2(Design & Contingencies - $51,000)

 

3(17) SR 0080, Highway Portion Bridge
4Preservation, Nine Bridges on I-80,
5Derry, Liberty and Valley Townships,
6Project ID 97601

 

7Project Allocation

431,000

8(Base Project Allocation - $401,000)

 

9(Design & Contingencies - $30,000)

 

10(18) SR 0080, Mill and Resurface Roadway,
11I-80 East Bound from SR 0054 Off Ramp
12to Montour/Columbia County Line,
13Includes Bridge Work over SR 0054,
14Mahoning Creek, Kase Run Road,
15Segments/Offset 2234/0000 to
162274/3158, Valley and West Hemlock
17Townships, Project ID 87569

 

18Project Allocation

12,177,000

19(Base Project Allocation -
20$12,106,000)

 

21(Design & Contingencies - $71,000)

 

22(19) SR 3003, Resurface Roadway, SR 3003
23from SR 3012 to PA 254, Liberty and
24Limestone Townships, Project ID 98630

 

25Project Allocation

120,000

26(Base Project Allocation - $104,000)

 

27(Design & Contingencies - $16,000)

 

28(20) SR 2111, Resurface Roadway, SR 2111
29from SR 2109 to SR 2102, Mayberry
30Township, Project ID 98629

 

1Project Allocation

422,000

2(Base Project Allocation - $391,000)

 

3(Design & Contingencies - $31,000)

 

4(21) SR 2111, Resurface Roadway, SR 2111
5from the Northumberland County Line to
6SR 2109, Mayberry Township, Project ID
798626

 

8Project Allocation

331,000

9(Base Project Allocation - $308,000)

 

10(Design & Contingencies - $23,000)

 

11(22) SR 2008, Resurface Roadway, SR 2008
12from Jade Avenue to Byrd Avenue,
13Mahoning Township, Project ID 98624

 

14Project Allocation

47,000

15(Base Project Allocation - $31,000)

 

16(Design & Contingencies - $16,000)

 

17(23) SR 2008, Resurface Roadway, SR 2008
18from Cherry Street to Copper Township
19Line, Cooper Township, Danville
20Borough, Mahoning Township, Project ID
2198610

 

22Project Allocation

164,000

23(Base Project Allocation - $104,000)

 

24(Design & Contingencies - $60,000)

 

25(24) SR 0045, Resurface, Northumberland
26County Line to PA 642, Segments
270010/0000 to 0070/2541, Liberty
28Township, Project ID 99123

 

29Project Allocation

1,156,000

30(Base Project Allocation - $1,136,000)

 

1(Design & Contingencies - $20,000)

 

2(25) SR 2007, Resurface, SR 2007 from SR
32012 to the Columbia County Line,
4Segments 0050/0000 to 0100/2941,
5Valley and West Hemlock Townships,
6Project ID 99135

 

7Project Allocation

1,186,000

8(Base Project Allocation - $1,165,000)

 

9(Design & Contingencies - $21,000)

 

10(26) SR 0642, Highway Portion Bridge
11Replacement, SR 0642 over Beaver Run,
12Liberty Township, Project ID 98507

 

13Project Allocation

82,000

14(Land Allocation - $41,000)

 

15(Design & Contingencies - $41,000)

 

16(27) SR 2007, Resurface Roadway, SR 2007
17from SR 0642 to SR 2012, Valley
18Township, Project ID 98537

 

19Project Allocation

380,000

20(Base Project Allocation - $358,000)

 

21(Design & Contingencies - $22,000)

 

22(28) SR 0080, Highway Portion Bridge
23Rehabilitation, I-80 Eastbound over SR
240054, BMS 47-0080-2234-1953, Valley
25Township, Project ID 98843

 

26Project Allocation

351,000

27(Land Allocation - $101,000)

 

28(Design & Contingencies - $250,000)

 

29(29) SR 2005, Resurface Roadway, SR 2005
30from SR 2008 to SR 2012, Mahoning and

 

1Valley Townships, Project ID 98529

 

2Project Allocation

69,000

3(Base Project Allocation - $47,000)

 

4(Design & Contingencies - $22,000)

 

5(30) SR 2014, Resurface, SR 2014 from PA
6254 to PA 642, Segments 0010/0000 to
70050/2999, Derry and West Hemlock
8Townships, Project ID 99406

 

9Project Allocation

1,020,000

10(Base Project Allocation - $1,000,000)

 

11(Design & Contingencies - $20,000)

 

12(31) SR 1003, Resurface Roadway, SR 1003
13from SR 0044 to the Lycoming County
14Line, Anthony Township, Project ID
1598525

 

16Project Allocation

902,000

17(Base Project Allocation - $851,000)

 

18(Design & Contingencies - $51,000)

 

19(32) SR 0044, Resurface, SR 0044 from the
20Columbia County Line to PA 54,
21Segments 0010/0000 to 0120/3036,
22Anthony and Limestone Townships,
23Project ID 99405

 

24Project Allocation

1,921,000

25(Base Project Allocation - $1,900,000)

 

26(Design & Contingencies - $21,000)

 

27(33) SR 0054, Resurface, SR 3008 to
28Roadside Res, Segments 0190/0200 to
290200/1369, Valley Township, Project ID
3099130

 

1Project Allocation

560,000

2(Base Project Allocation - $540,000)

 

3(Design & Contingencies - $20,000)

 

4(34) SR 0080, Resurface, I-80 Eastbound
5from the Northumberland County Line to
6Chillisquaque Creek, Liberty Township,
7Project ID 99174

 

8Project Allocation

70,000

9(Base Project Allocation - $50,000)

 

10(Design & Contingencies - $20,000)

 

11(35) SR 0054, Highway Portion Bridge
12Rehabilitation, SR 0054 Westbound over
13Mahoning Creek, BMS 47-0054-0231-1219,
14Valley Township, Project ID 98991

 

15Project Allocation

232,000

16(Base Project Allocation - $11,000)

 

17(Land Allocation - $50,000)

 

18(Design & Contingencies - $171,000)

 

19(36) SR 0044, Highway Portion Bridge
20Preservation, Nine Bridges on Various
21State Routes, Anthony, Derry, Liberty,
22Limestone, Valley and West Hemlock
23Townships, Project ID 98994

 

24Project Allocation

67,000

25(Base Project Allocation - $16,000)

 

26(Design & Contingencies - $51,000)

 

27(37) SR 2054, Resurface, SR 2054 from US
2811 to Front Street, Danville Borough,
29Project ID 99248

 

30Project Allocation

144,000

1(Base Project Allocation - $88,000)

 

2(Design & Contingencies - $56,000)

 

3(38) SR 2008, Resurface Roadway, SR 2008
4from Bryd Avenue to Gorvania Drive, SR
52008, Segments 0070/0000 to 0110/3320,
6Cooper and Mahoning Townships, Project
7ID 100451

 

8Project Allocation

1,551,000

9(Base Project Allocation - $1,501,000)

 

10(Design & Contingencies - $50,000)

 

11(39) I-80, Reconstruction, I-80 from the
12Northumberland County Line to the
13Columbia County Line, Various
14Municipalities, Project ID 0

 

15Project Allocation

46,800,000

16(Base Project Allocation -
17$46,800,000)

 

18(40) SR 0080, Major Guide Sign
19Replacement, I-80 in Montour County,
20Various Municipalities, Project ID
2199318

 

22Project Allocation

85,000

23(Base Project Allocation - $80,000)

 

24(Design & Contingencies - $5,000)

 

25(41) SR 0080, Highway Portion Bridge
26Rehabilitation, I-80 Westbound over
27Mahoning Creek, Valley Township,
28Project ID 98433

 

29Project Allocation

210,000

30(Base Project Allocation - $159,000)

 

1(Land Allocation - $51,000)

 

2(42) SR 0054, Resurface Roadway, SR 0054
3from SR 0044 to SR 3008, SR 0054,
4Segments 0010/0000 to 0180/3138,
5Anthony, Derry, Limestone and Valley
6Townships, Washingtonville Borough,
7Project ID 100483

 

8Project Allocation

5,050,000

9(Base Project Allocation - $5,000,000)

 

10(Design & Contingencies - $50,000)

 

11(43) SR 0254, Highway Portion Bridge
12Replacement, SR 0254 over Tributary of
13Mud Creek, Derry Township, Project ID
1498438

 

15Project Allocation

275,000

16(Base Project Allocation - $150,000)

 

17(Land Allocation - $60,000)

 

18(Design & Contingencies - $65,000)

 

19(44) SR 0080, Highway Portion Bridge
20Preservation, I-80 over Chillisquaque
21Creek, I-80 over Mauses Creek and SR
223007, I-80 over SR 0054 and Indian
23Creek, I-80 over Kase Run and Private
24Drive, Liberty and Valley Townships,
25Project ID 98992

 

26Project Allocation

95,000

27(Base Project Allocation - $75,000)

 

28(Design & Contingencies - $20,000)

 

29Section 348. Northampton County.

30Projects are as follows:

 

1(1) (Reserved).

 

2(2) SR 1042, Superstructure Replacement,
3Kromer Road over Route 33, Plainfield
4Township, Project ID 89617

 

5Project Allocation

6,335,000

6(Base Project Allocation - $5,700,000)

 

7(Land Allocation - $1,000)

 

8(Design & Contingencies - $634,000)

 

9(3) SR 0191, Highway Portion Bridge
10Rehabilitation, SR 0191 over Bushkill
11Creek, Palmer Township, Stockertown
12Borough, Project ID 89631

 

13Project Allocation

802,000

14(Base Project Allocation - $800,000)

 

15(Land Allocation - $1,000)

 

16(Design & Contingencies - $1,000)

 

17(4) SR 3004, Highway Portion Bridge
18Rehabilitation, SR 3004, SR 3004 over
19Saucon Creek, Hellertown Borough,
20Project ID 89641

 

21Project Allocation

1,168,000

22(Base Project Allocation - $875,000)

 

23(Land Allocation - $1,000)

 

24(Design & Contingencies - $292,000)

 

25(5) SR 2027, Highway Portion Bridge
26Rehabilitation, SR 2027 (Hecktown
27Road) over Route 22, Bethlehem
28Township, Project ID 89614

 

29Project Allocation

1,402,000

30(Base Project Allocation - $1,400,000)

 

1(Land Allocation - $1,000)

 

2(Design & Contingencies - $1,000)

 

3(6) SR 0248, Realignment, SR 0248 Main
4Street between Bridge Street and
5Chestnut Street, Bath Borough, Project
6ID 86853

 

7Project Allocation

114,000

8(Base Project Allocation - $114,000)

 

9(7) SR 0022, Pavement Rehabilitation, US
1022 from PA 191 to 25th Street,
11Bethlehem and Palmer Townships,
12Project ID 96420

 

13Project Allocation

11,002,000

14(Base Project Allocation -
15$11,000,000)

 

16(Land Allocation - $1,000)

 

17(Design & Contingencies - $1,000)

 

18(8) SR 0512, Highway Resurface, SR 0512,
19from Wind Gap to Bangor, Bangor and
20Pen Argyl Boroughs, Plainfield and
21Washington Townships, Wind Gap
22Borough, Project ID 94862

 

23Project Allocation

850,000

24(Base Project Allocation - $798,000)

 

25(Design & Contingencies - $52,000)

 

26(9) SR 0033, Pavement Reconstruction, PA
2733 from US 22 to the Monroe County
28Line, Bethlehem, Bushkill, Lower
29Nazareth, Palmer and Plainfield
30Townships, Stockertown and Wind Gap

 

1Boroughs, Project ID 96422

 

2Project Allocation

67,003,000

3(Base Project Allocation -
4$67,001,000)

 

5(Land Allocation - $1,000)

 

6(Design & Contingencies - $1,000)

 

7(10) SR 0033, Pavement Rehabilitation, PA
833 from I-78 to US 22, Bethlehem and
9Saucon Townships, Project ID 96423

 

10Project Allocation

6,003,000

11(Base Project Allocation - $6,001,000)

 

12(Land Allocation - $1,000)

 

13(Design & Contingencies - $1,000)

 

14(11) SR 3005, Resurface, Main Street,
15Washington Street from SR 2014 to SR
163007, City of Bethlehem, Freemansburg
17Borough, Project ID 96424

 

18Project Allocation

1,503,000

19(Base Project Allocation - $1,501,000)

 

20(Land Allocation - $1,000)

 

21(Design & Contingencies - $1,000)

 

22(12) New Roadway, Construct New 2-Lane
23Connector Roadway, between West Second
24Street and West Third Street, City of
25Bethlehem, Project ID 94603

 

26Project Allocation

175,000

27(Base Project Allocation - $110,000)

 

28(Land Allocation - $65,000)

 

29(13) SR 0248, Resurface, Bath Pike from
30PA 329 to Hollow Road, Bath Borough,

 

1Lower Nazareth Township, Nazareth
2Borough, Upper Nazareth Township,
3Project ID 96426

 

4Project Allocation

3,002,000

5(Base Project Allocation - $3,000,000)

 

6(Land Allocation - $1,000)

 

7(Design & Contingencies - $1,000)

 

8(14) SR 0512, Resurface, Walnut Street
9from Mill Street to Barrall Avenue,
10Bath Borough, Project ID 96427

 

11Project Allocation

802,000

12(Base Project Allocation - $800,000)

 

13(Land Allocation - $1,000)

 

14(Design & Contingencies - $1,000)

 

15(15) SR 0987, Resurface, Chestnut Street
16from PA 248 to Barrall Avenue, Bath
17Borough, Project ID 96428

 

18Project Allocation

252,000

19(Base Project Allocation - $250,000)

 

20(Land Allocation - $1,000)

 

21(Design & Contingencies - $1,000)

 

22(16) SR 4020, Highway Rehabilitation
23Associated with Stone Arch Bridge
24Rehabilitation, SR 4020 (Maple Drive
25at Bertsch Road) over Bertsch Creek,
26Lehigh Township, Project ID 94349

 

27Project Allocation

2,065,000

28(Base Project Allocation - $1,500,000)

 

29(Land Allocation - $56,000)

 

30(Design & Contingencies - $509,000)

 

1(17) SR 3011, Resurface, Center Street
2(SR 3011) from Elizabeth Avenue to
3before Monocacy Bridge, City of
4Bethlehem, Project ID 96429

 

5Project Allocation

4,252,000

6(Base Project Allocation - $3,750,000)

 

7(Land Allocation - $1,000)

 

8(Design & Contingencies - $501,000)

 

9(18) SR 0248, Resurface, PA 248 from PA
10191 to PA 33, Lower Nazareth Township,
11Project ID 96430

 

12Project Allocation

1,572,000

13(Base Project Allocation - $1,570,000)

 

14(Land Allocation - $1,000)

 

15(Design & Contingencies - $1,000)

 

16(19) SR 3011, Highway Portion Bridge
17Rehabilitation, SR 3011 (Fahy Bridge)
18over Railroad and Lehigh River, City
19of Bethlehem, Project ID 93632

 

20Project Allocation

2,843,000

21(Base Project Allocation - $1,833,000)

 

22(Land Allocation - $115,000)

 

23(Design & Contingencies - $895,000)

 

24(20) SR 0033, Highway Portion Bridge
25Rehabilitation, SR 0033 Southbound
26over Bushkill Creek, Stockertown
27Borough, Project ID 91673

 

28Project Allocation

2,602,000

29(Base Project Allocation - $2,600,000)

 

30(Land Allocation - $1,000)

 

1(Design & Contingencies - $1,000)

 

2(21) SR 0033, Resurface, SR 0033 from
3Route 512 to the Monroe County Line,
4Plainfield Township, Wind Gap Borough,
5Project ID 94860

 

6Project Allocation

580,000

7(Base Project Allocation - $547,000)

 

8(Design & Contingencies - $33,000)

 

9(22) SR 0033, Highway Portion Bridge
10Replacement, PA 33 Northbound over
11Bushkill Creek, Stockertown Borough,
12Project ID 96431

 

13Project Allocation

1,002,000

14(Base Project Allocation - $1,000,000)

 

15(Land Allocation - $1,000)

 

16(Design & Contingencies - $1,000)

 

17(23) SR 0248, Safety Improvements,
18Northampton Street, 15th Street to 4th
19Street, 13th Street, Northampton
20Street to Butler Street, City of
21Easton, Project ID 94872

 

22Project Allocation

138,000

23(Base Project Allocation - $138,000)

 

24(24) SR 0248, Safety Improvement,
25Intersection of SR 0248 and 946,
26Lehigh Township, Project ID 93116

 

27Project Allocation

193,000

28(Base Project Allocation - $193,000)

 

29(25) SR 0248, Safety Improvement,
30Intersection of SR 0248 and Walnut

 

1Drive, Lehigh Township, Project ID
294864

 

3Project Allocation

156,000

4(Base Project Allocation - $156,000)

 

5(26) SR 0946, Highway Resurface, SR 0946,
6Ranger Road to 512, Moore Township,
7Project ID 94861

 

8Project Allocation

244,000

9(Base Project Allocation - $231,000)

 

10(Design & Contingencies - $13,000)

 

11(27) SR 3020, Intersection Signalization,
12SR 3020, Segments 120, Newburg Road
13and Country Club Intersection, Lower
14Nazareth Township, Project ID 79558

 

15Project Allocation

63,000

16(Base Project Allocation - $63,000)

 

17(28) SR 0611, Replace/Repair SR 0611
18Canal Wall, SR 0611, Segments 40 and
1950, Williams Township, Project ID
2097228

 

21Project Allocation

1,201,000

22(Base Project Allocation - $1,200,000)

 

23(Design & Contingencies - $1,000)

 

24(29) SR 0078, Bearing Replacements,
25Saucon Viaduct, City of Bethlehem,
26Project ID 96415

 

27Project Allocation

1,887,000

28(Base Project Allocation - $1,854,000)

 

29(Design & Contingencies - $33,000)

 

30(30) SR 0946, Resurface, SR 0946 from SR

 

10512 to SR 0191, Bushkill, Lower
2Nazareth, Moore and Upper Nazareth
3Townships, Project ID 101548

 

4Project Allocation

1,500,000

5(Base Project Allocation - $1,470,000)

 

6(Design & Contingencies - $30,000)

 

7(31) SR 0145, Resurface, Lehigh County
8Line to Route 248, Lehigh Township and
9Walnutport Borough, Project ID 101556

 

10Project Allocation

2,550,000

11(Base Project Allocation - $2,500,000)

 

12(Design & Contingencies - $50,000)

 

13(32) SR 1002, Resurface, SR 1002 (Uhler
14Road) from SR 2025 (Sullivan Trail) to
15SR 1015 (Main Street), SR 0611, Forks
16and Lower Mount Bethel Townships,
17Project ID 101543

 

18Project Allocation

1,600,000

19(Base Project Allocation - $1,500,000)

 

20(Design & Contingencies - $100,000)

 

21(33) I-78, Reconstruction, I-78 from the
22Lehigh County Line to the New Jersey
23State Line, Various Municipalities,
24Project ID 0

 

25Project Allocation

48,800,000

26(Base Project Allocation -
27$48,800,000)

 

28Section 349. Northumberland County.

29Projects are as follows:

 

30(1) (Reserved).

 

1(2) SR 1007, Resurface, SR 1007 from
2Moore Drive to Walnut Street, Segments
30050/0357 to 0070/1186, Delaware
4Township, McEwensville Borough,
5Project ID 97709

 

6Project Allocation

320,000

7(Base Project Allocation - $300,000)

 

8(Design & Contingencies - $20,000)

 

9(3) SR 0125, Mill and Resurface Roadway,
10SR 0125 from Burnside to SR 0061,
11Segments/Offset 0190/0000 to
120250/0230, Segments/Offset 0241/0000
13to 0241/3131, Coal Township, City of
14Shamokin, Project ID 87911

 

15Project Allocation

2,366,000

16(Base Project Allocation - $2,317,000)

 

17(Design & Contingencies - $49,000)

 

18(4) SR 0061, Highway Portion Bridge
19Preservation, SR 0061 over Susquehanna
20River, BMS 49-0061-0580-0000, City of
21Sunbury, Project ID 97603

 

22Project Allocation

3,401,000

23(Base Project Allocation - $3,001,000)

 

24(Design & Contingencies - $400,000)

 

25(5) SR 0045, Highway Portion Bridge
26Preservation, SR 0045 over West Branch
27of Susquehanna River, West
28Chillisquaque Township, Project ID
2997602

 

30Project Allocation

550,000

1(Base Project Allocation - $500,000)

 

2(Design & Contingencies - $50,000)

 

3(6) SR 0054, Highway Portion Bridge
4Replacement, SR 0054 (Market Street),
5Ralpho Township, Project ID 88778

 

6Project Allocation

183,000

7(Base Project Allocation - $183,000)

 

8(7) SR 0011, Roadway Intersection
9Improvement, US 11 at the Intersection
10with US 147 SR 0011 Segment 0010/1400,
11Segment 0030/0848 SR 0147 Segment
120600/0000, Segment 0600/1000,
13Northumberland Borough, Project ID
1493013

 

15Project Allocation

1,412,000

16(Base Project Allocation - $1,011,000)

 

17(Land Allocation - $100,000)

 

18(Design & Contingencies - $301,000)

 

19(8) SR 0147, Mill and Resurface Roadway,
20SR 0147 from SR 0045 to South of Muddy
21Run, Segment/Offset 0713/0000 to
220843/1578, Milton Borough, Turbot and
23West Chillisquaque Townships, Project
24ID 87947

 

25Project Allocation

7,939,000

26(Base Project Allocation - $7,862,000)

 

27(Design & Contingencies - $77,000)

 

28(9) SR 2024, Highway Portion Bridge
29Rehabilitation, SR 2024 over South
30Branch Roaring Creek, BMS 49-2024-

 


10010-0728, Ralpho Township, Project ID
297550

 

3Project Allocation

910,000

4(Base Project Allocation - $800,000)

 

5(Land Allocation - $55,000)

 

6(Design & Contingencies - $55,000)

 

7(10) SR 0061, Mill and Resurface Roadway,
8SR 0061, Segments 0120/0532 to
90140/0219, Segments 0121/0550 to
100131/1986, Coal Township, Project ID
1187944

 

12Project Allocation

183,000

13(Base Project Allocation - $183,000)

 

14(11) SR 0054, Mill and Resurface Roadway,
15SR 0054 from the Montour County Line
16to Boyd Station, Segments/Offset
170190/0000 to 0240/1332, Riverside
18Borough, Rush Township, Project ID
1987909

 

20Project Allocation

1,151,000

21(Base Project Allocation - $1,101,000)

 

22(Design & Contingencies - $50,000)

 

23(12) SR 0061, Safety Improvement, SR 0061
24over Susquehanna River, City of
25Sunbury, Project ID 96593

 

26Project Allocation

3,074,000

27(Base Project Allocation - $3,014,000)

 

28(Design & Contingencies - $60,000)

 

29(13) SR 0044, Highway Portion Bridge
30Rehabilitation, SR 0044 over Dry Run,

 

1Delaware Township, Project ID 88796

 

2Project Allocation

85,000

3(Design & Contingencies - $85,000)

 

4(14) SR 0054, Mill and Resurface Roadway,
5SR 0054 from the Boyd Station to
6Elysburg, Segments/Offset 0240/1332 to
70340/0479, Ralpho and Rush Townships,
8Project ID 87907

 

9Project Allocation

5,001,000

10(Base Project Allocation - $4,941,000)

 

11(Design & Contingencies - $60,000)

 

12(15) SR 0054, Resurface, PA 54 from
13Locust Gap to West of Locust Summit,
14Segments 0582/1923 to 0612/2678, Mount
15Carmel Township, Project ID 97708

 

16Project Allocation

496,000

17(Base Project Allocation - $476,000)

 

18(Design & Contingencies - $20,000)

 

19(16) SR 0147, Resurface, SR 0147 from
20Dauphin County to Dalmatia Creek,
21Segments 0010/0000 to 0110/0000, Lower
22Mahanoy Township, Project ID 92901

 

23Project Allocation

1,916,000

24(Base Project Allocation - $1,815,000)

 

25(Design & Contingencies - $101,000)

 

26(17) SR 0061, Resurface, SR 0061 from
27Uniontown to Weigh Scales, Segments
280180/0966 to 0240/0663, 0195/0000 to
290241/0663, Coal and Ralpho Townships,
30Project ID 87910

 

1Project Allocation

7,191,000

2(Base Project Allocation - $5,750,000)

 

3(Land Allocation - $1,321,000)

 

4(Design & Contingencies - $120,000)

 

5(18) SR 0054, Resurface, PA 54 from
6Locust Summit to the Columbia County
7Line, Segments 0652/0000 to 0672/1442,
8Mount Carmel Township, Project ID
997707

 

10Project Allocation

522,000

11(Base Project Allocation - $501,000)

 

12(Design & Contingencies - $21,000)

 

13(19) SR 0147, Resurface Roadway, SR 0147
14from SR 4020 to SR 4018,
15Segments/Offset 0380/2464 to
160500/0600, Lower Augusta and Upper
17Augusta Townships, Project ID 87908

 

18Project Allocation

2,427,000

19(Base Project Allocation - $2,401,000)

 

20(Design & Contingencies - $26,000)

 

21(20) SR 0061, Highway Portion Bridge
22Replacement, SR 0061 over Quaker Run,
23Kulpmont Borough, Project ID 97588

 

24Project Allocation

1,503,000

25(Base Project Allocation - $1,301,000)

 

26(Land Allocation - $101,000)

 

27(Design & Contingencies - $101,000)

 

28(21) SR 0180, Reconstruction, I-180 from
29SR 0054 to SR 0147 Both Directions,
30Segments 0550/0160 to 0594/2686,

 

10545/1505 to 0595/2707, Delaware and
2Turbot Townships, Project ID 97549

 

3Project Allocation

547,000

4(Base Project Allocation - $407,000)

 

5(Design & Contingencies - $140,000)

 

6(22) SR 0180, Safety Improvements, SR
70180, Northumberland and Lycoming
8Counties, Various, Project ID 87001

 

9Project Allocation

575,000

10(Base Project Allocation - $575,000)

 

11(23) SR 0011, Highway Portion Bridge
12Replacement, SR 0011 over Tributary of
13Susquehanna River, Point Township,
14Project ID 63639

 

15Project Allocation

254,000

16(Base Project Allocation - $195,000)

 

17(Design & Contingencies - $59,000)

 

18(24) SR 0011, Reconstruct Roadway, US 11
19from Bridge Avenue to Old Danville
20Road, US 11, Segments 0041/0000 to
210051/2037, Northumberland Borough,
22Project ID 97653

 

23Project Allocation

3,816,000

24(Base Project Allocation - $3,251,000)

 

25(Land Allocation - $225,000)

 

26(Design & Contingencies - $340,000)

 

27(25) SR 0054, Highway Reconstruction, SR
280054 Elysburg Road from SR 0044 to
29Logan Run, Rush Township and Riverside
30Borough, Project ID 86930

 

1Project Allocation

115,000

2(Base Project Allocation - $105,000)

 

3(Design & Contingencies - $10,000)

 

4(26) SR 1027, Highway Portion Bridge
5Replacement, SR 1027 over Ross Creek,
6East Chillisquaque Township, Project
7ID 97586

 

8Project Allocation

1,000,000

9(Base Project Allocation - $800,000)

 

10(Land Allocation - $100,000)

 

11(Design & Contingencies - $100,000)

 

12(27) SR 0080, Mill and Resurface, I-80
13Eastbound from SR 0405 to the Montour
14County Line, I-80, Segments 2440/0000
15to 2160/2060, East Chillisquaque and
16Turbot Township, Project ID 97564

 

17Project Allocation

1,065,000

18(Base Project Allocation - $965,000)

 

19(Design & Contingencies - $100,000)

 

20(28) SR 0180, Resurface, I-180 Eastbound
21from Hall Road to the Watontown Exit,
22Delaware Township, Project ID 87580

 

23Project Allocation

43,000

24(Base Project Allocation - $42,000)

 

25(Design & Contingencies - $1,000)

 

26(29) SR 0147, Drainage Right of Way, SR
270147, Segments 0772/1315 to 0773/1294,
28West Chillisquaque Township, Project
29ID 90945

 

30Project Allocation

490,000

1(Base Project Allocation - $450,000)

 

2(Design & Contingencies - $40,000)

 

3(30) SR 0180, Highway Reconstruction, I-
4180 Westbound from Shanner Lane to the
5Northumberland/Lycoming County Line,
6Includes SR 0054 On and Off Ramps, and
7I-180 Bridges over SR 0054 and T-655,
8Segments/Offset (180) 0505/0000 to
90545/1505, Delaware Township, Project
10ID 87578

 

11Project Allocation

2,685,000

12(Base Project Allocation - $2,380,000)

 

13(Design & Contingencies - $305,000)

 

14(31) SR 0054, Roadway Reconstruction, SR
150054 from East of Locust Gap to Locust
16Summit, Mount Carmel Township, Project
17ID 97593

 

18Project Allocation

2,851,000

19(Base Project Allocation - $2,451,000)

 

20(Land Allocation - $150,000)

 

21(Design & Contingencies - $250,000)

 

22(32) SR 0147, Reconstruct Roadway, SR
230147 from Packer Island Bridge to
24Eighth Street, Segments/Offset
250590/1780 to 0604/2292, Northumberland
26Borough, Point Township, Project ID
2796678

 

28Project Allocation

14,886,000

29(Base Project Allocation -
30$12,863,000)

 

1(Land Allocation - $598,000)

 

2(Design & Contingencies - $1,425,000)

 

3(33) SR 0642, Highway Portion Bridge
4Preservation, Two Bridges on SR 0642
5over the West Branch of the
6Susquehanna River, Milton Borough,
7Project ID 97605

 

8Project Allocation

750,000

9(Base Project Allocation - $675,000)

 

10(Design & Contingencies - $75,000)

 

11(34) SR 4009, Resurface, SR 4009 from PA
1261 to SR 4012, Segments 0010/0000 to
130030/1083, Upper Augusta Township,
14Project ID 97713

 

15Project Allocation

220,000

16(Base Project Allocation - $200,000)

 

17(Design & Contingencies - $20,000)

 

18(35) SR 0045, Resurface Roadway, SR 0045
19from T-605 (Noaker Street) to the
20Montour County Line, Segments
210070/2850 to 0130/2239, East
22Chillisquaque and West Chillisquaque
23Townships, Project ID 88941

 

24Project Allocation

315,000

25(Base Project Allocation - $304,000)

 

26(Design & Contingencies - $11,000)

 

27(36) SR 0061, Mill and Resurface Roadway,
28SR 0061 from Weigh Scales to Paxinos,
29Segments 0240/0663 to 0280/0871,
300241/0663 to 0280/0871, Ralpho and

 

1Shamokin Townships, Project ID 87905

 

2Project Allocation

800,000

3(Base Project Allocation - $752,000)

 

4(Design & Contingencies - $48,000)

 

5(37) SR 0147, Resurface, SR 0147 from
6Dalmatia Creek to PA 225, Segments
70110/0000 to 0200/3120, Lower Mahanoy
8Township, Project ID 92902

 

9Project Allocation

2,416,000

10(Base Project Allocation - $2,315,000)

 

11(Design & Contingencies - $101,000)

 

12(38) SR 0125, Highway Portion Bridge
13Replacement, SR 0125 (Stitzer Road)
14over Carbon Run, Coal Township,
15Project ID 91430

 

16Project Allocation

1,021,000

17(Base Project Allocation - $821,000)

 

18(Land Allocation - $100,000)

 

19(Design & Contingencies - $100,000)

 

20(39) SR 0901, Reconstruct Roadway, SR
210054 from East of Locust Gap to Locust
22Summit, SR 0901, Segments 0132/0000 to
230132/1851, Mount Carmel Township,
24Project ID 97655

 

25Project Allocation

2,851,000

26(Base Project Allocation - $2,651,000)

 

27(Land Allocation - $50,000)

 

28(Design & Contingencies - $150,000)

 

29(40) SR 0061, Mill and Resurface, SR 0061
30(Market Street) from Seventh Street to

 

1Front Street, SR 0061 from Segments
20540/0745 to 0570/0545 and 0561/0000
3to 0561/0580, City of Sunbury, Project
4ID 86882

 

5Project Allocation

721,000

6(Base Project Allocation - $700,000)

 

7(Design & Contingencies - $21,000)

 

8(41) SR 0254, Resurface Roadway, SR 0254
9from SR 0405 to Queen Street, Milton
10Borough, Project ID 98666

 

11Project Allocation

37,000

12(Base Project Allocation - $21,000)

 

13(Design & Contingencies - $16,000)

 

14(42) TR 320, Highway Portion Bridge
15Replacement, TR 320 over Shamokin
16Creek, Mount Carmel Borough, Project
17ID 99104

 

18Project Allocation

270,000

19(Base Project Allocation - $200,000)

 

20(Land Allocation - $20,000)

 

21(Design & Contingencies - $50,000)

 

22(43) SR 0254, Resurface Roadway, SR 0254
23from Queen Street to Eisley road,
24Turbot Township, Project ID 98671

 

25Project Allocation

33,000

26(Base Project Allocation - $17,000)

 

27(Design & Contingencies - $16,000)

 

28(44) SR 0225, Resurface Roadway, SR 0225
29from Mouse Creek to SR 3006, Jackson
30Township, Project ID 98658

 

1Project Allocation

80,000

2(Base Project Allocation - $49,000)

 

3(Design & Contingencies - $31,000)

 

4(45) SR 0405, Resurface Roadway, SR 0405
5from SR 0147 to Housels Run, West
6Chillisquaque Township, Project ID
798674

 

8Project Allocation

409,000

9(Base Project Allocation - $259,000)

 

10(Design & Contingencies - $150,000)

 

11(46) SR 0642, Resurface Roadway, SR 0642
12from SR 0147 Northbound Ramps to the
13Montour County Line, East
14Chillisquaque Township, Project ID
1598684

 

16Project Allocation

198,000

17(Base Project Allocation - $122,000)

 

18(Design & Contingencies - $76,000)

 

19(47) SR 0147, Resurface Roadway, SR 0147
20from SR 3006 to SR 4020, Jackson and
21Lower Augusta Townships, Project ID
2298653

 

23Project Allocation

269,000

24(Base Project Allocation - $159,000)

 

25(Design & Contingencies - $110,000)

 

26(48) SR 0890, Resurface Roadway, SR 0890
27from SR 0225 to SR 4013, Rockefeller,
28Shamokin and Zerbe Townships, Project
29ID 98687

 

30Project Allocation

159,000

1(Base Project Allocation - $99,000)

 

2(Design & Contingencies - $60,000)

 

3(49) SR 0225, Resurface Roadway, SR 0225
4from Sixth Street to Snyder Road,
5Zerbe Township, Project ID 98662

 

6Project Allocation

70,000

7(Base Project Allocation - $40,000)

 

8(Design & Contingencies - $30,000)

 

9(50) SR 0044, Highway Portion Bridge
10Replacement, SR 0044 over Tributary of
11Chillisquaque Creek, BMS 49-0044-0030-
120830, Lewis Township, Project ID 99001

 

13Project Allocation

321,000

14(Land Allocation - $100,000)

 

15(Design & Contingencies - $221,000)

 

16(51) SR 0147, Highway Portion Bridge Deck
17Preservation, PA 0147 over North
18Branch of Susquehanna River, Upper
19Augusta Township, Northumberland
20Borough, Project ID 99449

 

21Project Allocation

171,000

22(Base Project Allocation - $171,000)

 

23(52) SR 0044, Resurface Roadway, PA 0044
24from Tannery Run to West Branch
25Susquehanna River, Delaware Township
26and Watsontown Borough, Project ID
2798631

 

28Project Allocation

132,000

29(Base Project Allocation - $86,000)

 

30(Design & Contingencies - $46,000)

 

1(53) SR 0080, Highway Portion Bridge
2Rehabilitation, I-80 Westbound over SR
30254, BMS 49-0080-2151-1461, Turbot
4Township, Project ID 98836

 

5Project Allocation

391,000

6(Base Project Allocation - $189,000)

 

7(Land Allocation - $101,000)

 

8(Design & Contingencies - $101,000)

 

9(54) SR 0061, Highway Portion Bridge
10Rehabilitation, SR 0061 over Lick Run,
11BMS 49-0061-0380-0282, Shamokin
12Township, Project ID 99017

 

13Project Allocation

321,000

14(Land Allocation - $101,000)

 

15(Design & Contingencies - $220,000)

 

16(55) SR 4026, Resurface Roadway, SR 4026
17from SR 0890 to SR 0061, SR 4026,
18Segments 0010/0000, 0190/1707,
19Rockefeller and Shamokin Townships,
20Project ID 100502

 

21Project Allocation

1,250,000

22(Base Project Allocation - $1,200,000)

 

23(Design & Contingencies - $50,000)

 

24(56) SR 0061, Highway Portion Bridge
25Rehabilitation, SR 0061 over SR 2029
26and SR 0901, BMS 49-0061-0110-0718,
27Coal Township, Project ID 99009

 

28Project Allocation

322,000

29(Land Allocation - $101,000)

 

30(Design & Contingencies - $221,000)

 

1(57) SR 0061, Highway Portion Bridge
2Rehabilitation, SR 0061 over Dark Run,
3BMS 49-0061-0080-0819, Coal Township,
4Project ID 99006

 

5Project Allocation

202,000

6(Land Allocation - $101,000)

 

7(Design & Contingencies - $101,000)

 

8(58) SR 0054, Highway Portion Bridge
9Replacement, SR 0054 over Tributary of
10Shamokin Creek, BMS 49-0054-0280-0000,
11Rush Township, Project ID 99004

 

12Project Allocation

321,000

13(Land Allocation - $100,000)

 

14(Design & Contingencies - $221,000)

 

15(59) SR 1007, Resurface Roadway, SR 1007
16from SR 0405 to Main Street, Delaware
17Township, McEwensville Borough, Turbot
18Township, Project ID 98703

 

19Project Allocation

77,000

20(Base Project Allocation - $47,000)

 

21(Design & Contingencies - $30,000)

 

22(60) SR 0080, Highway Portion Bridge
23Rehabilitation, I-80 Eastbound over SR
240254, BMS 49-0080-2150-1030, Turbot
25Township, Project ID 98831

 

26Project Allocation

391,000

27(Base Project Allocation - $189,000)

 

28(Land Allocation - $101,000)

 

29(Design & Contingencies - $101,000)

 

30(61) SR 0147, Highway Portion Bridge

 

1Replacement, SR 0147 over Tributary of
2Susquehanna River, Lower Mahanoy
3Township, Project ID 99099

 

4Project Allocation

321,000

5(Land Allocation - $100,000)

 

6(Design & Contingencies - $221,000)

 

7(62) SR 0061, Resurface, SR 0061 from
8Kulpmont Borough Line to Ranshaw,
9Segments 0080/0467 to 0100/2066,
10Segments 0081/0467 to 0101/2083, Coal
11Township, Project ID 99391

 

12Project Allocation

1,322,000

13(Base Project Allocation - $1,301,000)

 

14(Design & Contingencies - $21,000)

 

15(63) SR 0054, Resurface, SR 0054 from I-
16180 to PA 44, Segments 0130/0000 to
170180/2403, Delaware and Lewis
18Townships, Turbotville Borough,
19Project ID 99390

 

20Project Allocation

1,036,000

21(Base Project Allocation - $1,016,000)

 

22(Design & Contingencies - $20,000)

 

23(64) SR 4018, Highway Portion Bridge
24Rehabilitation, SR 4018 over Tributary
25of Indian Spring Creek, BMS 49-4018-
260030-1171, Rockefeller Township,
27Project ID 98921

 

28Project Allocation

66,000

29(Base Project Allocation - $50,000)

 

30(Design & Contingencies - $16,000)

 

1(65) SR 4004, Resurface Roadway, SR 4004
2from Mile Post Road to SR 4006, Rush
3and Upper Augusta Townships, Project
4ID 98722

 

5Project Allocation

1,250,000

6(Base Project Allocation - $1,200,000)

 

7(Design & Contingencies - $50,000)

 

8(66) SR 3001, Resurface Roadway, SR 3001
9from SR 3010 to SR 3006, Jackson
10Township, Project ID 98717

 

11Project Allocation

366,000

12(Base Project Allocation - $335,000)

 

13(Design & Contingencies - $31,000)

 

14(67) SR 0011, Highway Portion Bridge
15Rehabilitation, SR 0011 over Packer
16Run, BMS 49-0011-0160-2007, Point
17Township, Project ID 98993

 

18Project Allocation

222,000

19(Land Allocation - $51,000)

 

20(Design & Contingencies - $171,000)

 

21(68) SR 0147, Resurface Roadway, SR 0147
22from Wise Road to SR 3006, Jackson
23Township, Project ID 98645

 

24Project Allocation

36,000

25(Base Project Allocation - $21,000)

 

26(Design & Contingencies - $15,000)

 

27(69) SR 2034, Resurface Roadway, SR 2034
28from SR 0061 to SR 0054, Kulpmont
29Borough, Mount Carmel Township,
30Project ID 98713

 

1Project Allocation

330,000

2(Base Project Allocation - $300,000)

 

3(Design & Contingencies - $30,000)

 

4(70) SR 0054, Highway Portion Bridge
5Replacement, SR 0054 over Delaware
6Run, BMS 49-0054-0090-0835, Delaware
7Township, Project ID 99002

 

8Project Allocation

321,000

9(Land Allocation - $100,000)

 

10(Design & Contingencies - $221,000)

 

11(71) I-180, Reconstruction, I-180 from
12its Eastern Terminus at I-80 to the
13Lycoming County Line, Various
14Municipalities, Project ID 0

 

15Project Allocation

37,400,000

16(Base Project Allocation -
17$37,400,000)

 

18(72) SR 0180, Major Guide Sign
19Replacement, I-180 in Northumberland
20County, Various Municipalities,
21Project ID 99334

 

22Project Allocation

60,000

23(Base Project Allocation - $50,000)

 

24(Design & Contingencies - $10,000)

 

25(73) SR 0180, Install Median Cable
26Guiderail, US 15 in Union County and
27PA 147 and I-180 in Northumberland
28County, Various Municipalities,
29Northumberland and Union Counties,
30Project ID 99178

 

1Project Allocation

304,000

2(Base Project Allocation - $304,000)

 

3(74) SR 0011, Resurface, SR 0011 from SR
41024 (Ridge Road) to the Montour
5County Line, Point Township, Project
6ID 99177

 

7Project Allocation

323,000

8(Base Project Allocation - $293,000)

 

9(Design & Contingencies - $30,000)

 

10(75) SR 0147, Major Guide Sign
11Replacement, SR 0147 in Northumberland
12County, Various Municipalities,
13Project ID 99332

 

14Project Allocation

44,000

15(Base Project Allocation - $34,000)

 

16(Design & Contingencies - $10,000)

 

17(76) I-80, Reconstruction, I-80 from the
18Union County Line to the Montour
19County Line, Various Municipalities,
20Project ID 0

 

21Project Allocation

22,000,000

22(Base Project Allocation -
23$22,000,000)

 

24(77) SR 011, Resurface, SR 0011 from SR
250147 to C Street, Northumberland
26Borough, Project ID 99176

 

27Project Allocation

119,000

28(Base Project Allocation - $99,000)

 

29(Design & Contingencies - $20,000)

 

30(78) SR 0080, Highway Portion Bridge

 

1Preservation, 12 Bridges on I-80 in
2Northumberland and Union Counties,
3Chapman, Turbot and White Townships,
4Project ID 98521

 

5Project Allocation

145,000

6(Base Project Allocation - $135,000)

 

7(Design & Contingencies - $10,000)

 

8(79) SR 0061, Resurface, SR 0061, from PA
9890 to Seventh Street, Segments
100500/2018 to 0540/0745, City of
11Sunbury, Upper Augusta Township,
12Project ID 99183

 

13Project Allocation

470,000

14(Base Project Allocation - $450,000)

 

15(Design & Contingencies - $20,000)

 

16(80) SR 0054, Resurface, SR 0054 from
17Elysburg to PA 487, Segments 0340/0371
18to 0360/0616, Ralpho Township, Project
19ID 99172

 

20Project Allocation

556,000

21(Base Project Allocation - $536,000)

 

22(Design & Contingencies - $20,000)

 

23(81) SR 0061, Roadway Reconstruction, SR
240061 from Fifth Street to Dark Run,
25Coal Township, Kulpmont Borough,
26Project ID 99327

 

27Project Allocation

350,000

28(Design & Contingencies - $350,000)

 

29(82) SR 0061, Roadway Reconstruction, SR
300061 from North Lombard Street to

 

1Shamokin Creek, Coal Township, City of
2Shamokin, Project ID 99329

 

3Project Allocation

325,000

4(Design & Contingencies - $325,000)

 

5(83) SR 0080, Major Guide Sign
6Replacement, I-80 in Northumberland
7County, Various Municipalities,
8Project ID 99331

 

9Project Allocation

60,000

10(Base Project Allocation - $50,000)

 

11(Design & Contingencies - $10,000)

 

12(84) SR 3018, Resurface, SR 3018 from
13Cemetery Road to the Schuylkill County
14Line, Segments 0010/0000 to 0120/2736,
15Jordan Township, Project ID 99213

 

16Project Allocation

2,120,000

17(Base Project Allocation - $2,100,000)

 

18(Design & Contingencies - $20,000)

 

19(85) SR 3010, Resurface, SR 3010 from PA
20147 to Village of Rebuck, Segments
210010/0000 to 0150/1039, Jackson and
22Washington Townships, Project ID 99212

 

23Project Allocation

2,422,000

24(Base Project Allocation - $2,401,000)

 

25(Design & Contingencies - $21,000)

 

26(86) SR 3007, Resurface, SR 3007 from SR
273016 to Schwaben Creek Road, Segments
280010/0000 to 0060/2570, Jordan, Upper
29Mahanoy and Washington Townships,
30Project ID 99205

 

1Project Allocation

911,000

2(Base Project Allocation - $890,000)

 

3(Design & Contingencies - $21,000)

 

4(87) SR 0147, Resurface Roadway, PA 147
5from Chestnut Street to Wise Road,
6Herndon Borough, Jackson Township,
7Project ID 98641

 

8Project Allocation

113,000

9(Base Project Allocation - $53,000)

 

10(Design & Contingencies - $60,000)

 

11(88) SR 0044, Resurface, SR 0044 from
12Tenth Street to the Village of Dewart,
13Segments 0200/0000 to 0220/2312,
14Delaware Township, Watsontown Borough,
15Project ID 99155

 

16Project Allocation

546,000

17(Base Project Allocation - $526,000)

 

18(Design & Contingencies - $20,000)

 

19(89) SR 0125, Resurface Roadway, PA 125
20from SR 3010 to 0.7 Mile South of
21Mahanoy Creek, East Cameron and Upper
22Mahanoy Townships, Project ID 98636

 

23Project Allocation

86,000

24(Base Project Allocation - $56,000)

 

25(Design & Contingencies - $30,000)

 

26(90) SR 1007, Resurface, SR 1007 from
27Warrior Run to PA 54, Segments
280080/0838 to 0130/3009, Delaware and
29Lewis Townships, Project ID 99195

 

30Project Allocation

1,121,000

1(Base Project Allocation - $1,100,000)

 

2(Design & Contingencies - $21,000)

 

3(91) SR 0054, Slide Repair, SR 0054
4between the Coal/Mount Carmel Township
5Line and SR 2028, Mount Carmel
6Township, Project ID 99238

 

7Project Allocation

485,000

8(Base Project Allocation - $335,000)

 

9(Design & Contingencies - $150,000)

 

10(92) SR 0147, Resurface, SR 0147 from PA
1145 to Muddy Run, Segments 0710/0000 to
120844/0147, Milton Borough, Turbot and
13West Chillisquaque Townships, Project
14ID 99188

 

15Project Allocation

2,641,000

16(Base Project Allocation - $2,620,000)

 

17(Design & Contingencies - $21,000)

 

18(93) SR 0147, Resurface, SR 0147 from
19Second Street to SR 0061, City of
20Sunbury, Project ID 99239

 

21Project Allocation

84,000

22(Base Project Allocation - $44,000)

 

23(Design & Contingencies - $40,000)

 

24(94) SR 1007, Highway Portion Bridge
25Replacement, SR 1007 over Branch of
26Warrior Run Creek, Delaware and Lewis
27Townships, Project ID 98531

 

28Project Allocation

281,000

29(Base Project Allocation - $151,000)

 

30(Land Allocation - $65,000)

 

1(Design & Contingencies - $65,000)

 

2(95) SR 0147, Resurface, SR 0147 from
3Muddy Run to I-80, Segments 0844/0147
4to 0850/1992, Turbot Township, Project
5ID 99193

 

6Project Allocation

791,000

7(Base Project Allocation - $771,000)

 

8(Design & Contingencies - $20,000)

 

9(96) SR 2019, Highway Portion Bridge
10Replacement, SR 2019 over Quacker Run,
11Coal Township, Project ID 98538

 

12Project Allocation

281,000

13(Base Project Allocation - $151,000)

 

14(Land Allocation - $65,000)

 

15(Design & Contingencies - $65,000)

 

16(97) SR 4004, Highway Portion Bridge
17Replacement, SR 4004 over Tributary of
18Susquehanna River, Upper Augusta
19Township, Project ID 98540

 

20Project Allocation

281,000

21(Base Project Allocation - $151,000)

 

22(Land Allocation - $65,000)

 

23(Design & Contingencies - $65,000)

 

24(98) SR 0044, Intersection Improvements,
25Intersection of SR 0044 and SR 1006,
26Watsontown Borough, Project ID 99243

 

27Project Allocation

301,000

28(Design & Contingencies - $301,000)

 

29(99) SR 4019, Highway Portion Bridge
30Replacement, SR 4019 over Tributary of

 

1Little Mahanoy Creek, Little Mahanoy
2Township, Project ID 98542

 

3Project Allocation

275,000

4(Base Project Allocation - $150,000)

 

5(Land Allocation - $60,000)

 

6(Design & Contingencies - $65,000)

 

7(100) SR 00147, Slide Repair, SR 0147
8South of Fish Commission Road to
9Shamokin Creek, Upper Augusta
10Township, Project ID 99333

 

11Project Allocation

181,000

12(Base Project Allocation - $31,000)

 

13(Design & Contingencies - $150,000)

 

14(101) Various, Highway Portion Bridge
15Preservation, Nine Bridges on I-80, SR
160225, SR 2010, Little Mahanoy, Ralpho,
17Shamokin and Turbot Townships, Project
18ID 97604

 

19Project Allocation

1,416,000

20(Base Project Allocation - $1,315,000)

 

21(Design & Contingencies - $101,000)

 

22(102) Various, Highway Portion Bridge
23Preservation, Various State Routes,
24Various Municipalities, Project ID
2597606

 

26Project Allocation

550,000

27(Base Project Allocation - $500,000)

 

28(Design & Contingencies - $50,000)

 

29(103) Various, Highway Portion Bridge
30Preservation, Various State Routes,

 

1Various Municipalities, Project ID
298526

 

3Project Allocation

396,000

4(Base Project Allocation - $385,000)

 

5(Design & Contingencies - $11,000)

 

6Section 350. Perry County.

7Projects are as follows:

 

8(1) (Reserved).

 

9(2) SR 0850, Resurface, PA 850 from PA 34
10to Marysville Borough Line, Carroll
11and Rye Townships, Project ID 82487

 

12Project Allocation

2,027,000

13(Base Project Allocation - $2,000,000)

 

14(Land Allocation - $9,000)

 

15(Design & Contingencies - $18,000)

 

16(3) SR 1023, Highway Portion Bridge
17Replacement, SR 1023 (Buffalo Creek
18Road) over Buffalo Creek, Watts
19Township, Project ID 87493

 

20Project Allocation

261,000

21(Base Project Allocation - $140,000)

 

22(Land Allocation - $50,000)

 

23(Design & Contingencies - $71,000)

 

24(4) SR 1015, Highway Portion Bridge
25Replacement, SR 1015 (Juniata Parkway)
26over Wildcat Run, Greenwood Township,
27Project ID 87491

 

28Project Allocation

194,000

29(Base Project Allocation - $194,000)

 

30(5) SR 3016, Highway Portion Bridge

 

1Replacement, SR 3016 (Pisgah State
2Road) over Tributary of Shermans
3Creek, Carroll Township, Project ID
487490

 

5Project Allocation

199,000

6(Base Project Allocation - $199,000)

 

7(6) SR 0274, Highway Portion Bridge
8Replacement, PA 274 over Branch of
9Shermans Creek, Toboyne Township,
10Project ID 87489

 

11Project Allocation

158,000

12(Base Project Allocation - $158,000)

 

13(7) SR 0274, Highway Portion Bridge
14Replacement, PA 274 over Tributary of
15Shermans Creek, Toboyne Township,
16Project ID 87488

 

17Project Allocation

234,000

18(Base Project Allocation - $234,000)

 

19(8) SR 0017, Highway Portion Bridge
20Replacement, PA 17 over Raccoon Creek,
21Tuscarora Township, Project ID 87485

 

22Project Allocation

201,000

23(Base Project Allocation - $201,000)

 

24(9) SR 2002, Highway Portion Bridge
25Replacement, SR 2002 (Dellville Road)
26over Tributary of Shermans Creek,
27Wheatfield Township, Project ID 87481

 

28Project Allocation

131,000

29(Base Project Allocation - $131,000)

 

30(10) SR 1015, Highway Portion Bridge

 

1Replacement, SR 1015 (Juniata Parkway)
2over Tributary of Juniata River, Howe
3Township, Project ID 87479

 

4Project Allocation

172,000

5(Base Project Allocation - $172,000)

 

6(11) SR 0017, Highway Portion Bridge
7Replacement, PA 17 over Tributary of
8Cocolamus Creek, Greenwood Township,
9Project ID 87473

 

10Project Allocation

139,000

11(Base Project Allocation - $139,000)

 

12(12) SR 0104, Highway Portion Bridge
13Replacement, PA 104 over Tributary of
14Susquehanna River, Liverpool Township,
15Project ID 87466

 

16Project Allocation

196,000

17(Base Project Allocation - $196,000)

 

18(13) SR 0850, Highway Portion Bridge
19Replacement, PA 850 over Bixlers Run,
20Northeast Madison Township, Project ID
2187465

 

22Project Allocation

204,000

23(Base Project Allocation - $204,000)

 

24(14) SR 1015, Highway Portion Bridge
25Replacement, SR 1015 (William Penn
26Highway/Juniata Parkway) over
27Tributary of Juniata River, Howe
28Township, Project ID 87463

 

29Project Allocation

262,000

30(Base Project Allocation - $262,000)

 

1(15) SR 0034, Safety Improvements, PA 34
2and PA 850 Intersection, Carroll
3Township, Project ID 85655

 

4Project Allocation

296,000

5(Base Project Allocation - $258,000)

 

6(Land Allocation - $10,000)

 

7(Design & Contingencies - $28,000)

 

8(16) SR 0274, Highway Portion Bridge
9Replacement, PA 274 over Tributary of
10Cisna Run, Southwest Madison Township,
11Project ID 87478

 

12Project Allocation

123,000

13(Base Project Allocation - $123,000)

 

14(17) SR 0017, Rehabilitation, Resurface,
15PA 17 (Tuscarora Path) from East of PA
16850 (Fort Robinson Road) to East of
17Wallett Road, Northeast Madison and
18Saville Townships, Project ID 96294

 

19Project Allocation

3,502,000

20(Base Project Allocation - $3,501,000)

 

21(Design & Contingencies - $1,000)

 

22(18) SR 0850, Resurface, PA 850 (For
23Robinson Road) from PA 17 (Blain
24Road/Tuscarora Road) to PA 274
25(Shermans Valley Road), Northeast
26Madison Township, Project ID 92351

 

27Project Allocation

593,000

28(Base Project Allocation - $567,000)

 

29(Design & Contingencies - $26,000)

 

30(19) SR 0011, Highway Portion Bridge

 

1Superstructure Replacement, US 11/15
2over West Main Street, Marysville
3Borough, Project ID 88922

 

4Project Allocation

206,000

5(Base Project Allocation - $144,000)

 

6(Land Allocation - $16,000)

 

7(Design & Contingencies - $46,000)

 

8(20) SR 0017, Rehabilitation, Resurface,
9PA 17, (Raccoon Valley Road) from East
10of Sherman Lane, Saville and Tuscarora
11Townships, Project ID 96295

 

12Project Allocation

3,426,000

13(Base Project Allocation - $3,425,000)

 

14(Design & Contingencies - $1,000)

 

15(21) SR 0850, Resurface, PA 850 (Fort
16Robinson Road) from SR 4002 (Liberty
17Valley Road) to PA 17 (Blain
18Road/Tuscarora Road), Northeast
19Madison Township, Project ID 92350

 

20Project Allocation

604,000

21(Base Project Allocation - $482,000)

 

22(Land Allocation - $21,000)

 

23(Design & Contingencies - $101,000)

 

24(22) SR 0849, Resurface, PA 849 (Creek
25Road) from PA 74 (Veterans Way) to SR
264006 (Buckwheat Road), Saville and
27Tuscarora Townships, Project ID 96293

 

28Project Allocation

3,425,000

29(Base Project Allocation - $3,425,000)

 

30(23) SR 0104, Rehabilitation, Resurface,

 

1PA 104 (Mill Road) from the Juniata
2County Line to US 11 (Susquehanna
3Trail), Liverpool Township, Project ID
496943

 

5Project Allocation

406,000

6(Base Project Allocation - $405,000)

 

7(Design & Contingencies - $1,000)

 

8(24) SR 0034, Safety Improvement, PA 34,
9Bloomfield Borough, Buffalo, Carroll,
10Centre and Howe Townships, Newport
11Borough, Oliver and Wheatfield
12Townships, Project ID 97406

 

13Project Allocation

96,000

14(Base Project Allocation - $45,000)

 

15(Design & Contingencies - $51,000)

 

16(25) SR 0849, Highway Portion Bridge
17Replacement, PA 849 (Creek Road) over
18Tributary of Big Buffalo Creek,
19Juniata Township, Project ID 90715

 

20Project Allocation

800,000

21(Base Project Allocation - $800,000)

 

22(26) SR 0017, Rehabilitation, Resurface,
23PA 17 (Tuscarora Road) from PA 274
24(East Main Street) to East of PA 850
25(Fort Robinson Road), Blain Borough,
26Jackson, Northeast Madison and
27Southwest Madison Townships, Project
28ID 96292

 

29Project Allocation

3,202,000

30(Base Project Allocation - $3,201,000)

 

1(Design & Contingencies - $1,000)

 

2(27) SR 0017, Resurface, PA 17 (Sunbury
3Street/Sunbury Path) from Cocalamus
4Creek Road to SR 1005 (Davidson Road),
5Greenwood and Liverpool Townships,
6Project ID 90887

 

7Project Allocation

2,711,000

8(Base Project Allocation - $2,661,000)

 

9(Design & Contingencies - $50,000)

 

10(28) SR 1015, Park and Ride, SR 1015
11(Market Street), Millerstown Borough,
12Greenwood Township, Project ID 100007

 

13Project Allocation

550,000

14(Base Project Allocation - $550,000)

 

15(29) SR 0011, Resurface, US 11
16(Susquehanna Trail) from Inn Road to
17the Juniata County Line, Duncannon
18Borough, Watts Township, New Buffalo
19Borough, Buffalo Township, Liverpool
20Borough, Liverpool Township, Project
21ID 100142

 

22Project Allocation

8,500,000

23(Base Project Allocation - $8,500,000)

 

24(30) SR 0850, Highway Portion Bridge
25Preservation, SR 0850, Carroll,
26Northeast Madison and Rye Townships,
27Project ID 99175

 

28Project Allocation

600,000

29(Base Project Allocation - $600,000)

 

30(31) SR 0022, Resurface, US 22 (William

 

1Penn Highway) from the Dauphin County
2Line to the Juniata County Line,
3Buffalo, Greenwood and Howe Townships,
4Millerstown Borough and Watts
5Township, Project ID 101156

 

6Project Allocation

20,000,000

7(Base Project Allocation -
8$20,000,000)

 

9(32) SR 0034, Park and Ride,
10Shermandsdale near the Intersection of
11PA 34 (Spring Road) and PA 850 (Valley
12Road), Carroll Township, Project ID
13100011

 

14Project Allocation

550,000

15(Base Project Allocation - $550,000)

 

16Section 351. Philadelphia County.

17Projects are as follows:

 

18(1) (Reserved).

 

19(2) SR 0001, Highway Rehabilitation
20Associated with Bridge Work, Roosevelt
21Boulevard over Roberts Road and Wayne
22Junction, City of Philadelphia,
23Project ID 83736

 

24Project Allocation

43,198,000

25(Base Project Allocation -
26$39,970,000)

 

27(Land Allocation - $943,000)

 

28(Design & Contingencies - $2,285,000)

 

29(3) SR 0095, Pavement Restoration,
30Shackamaxon Avenue to Columbia Avenue,

 

1City of Philadelphia, Project ID 83640

 

2Project Allocation

9,302,000

3(Base Project Allocation - $9,302,000)

 

4(4) SR 0095, Widen and Reconstruct,
5Southbound I-95, Wheatsheaf Lane to
6Orthodox Street, City of Philadelphia,
7Project 79905

 

8Project Allocation

55,213,000

9(Base Project Allocation -
10$55,213,000)

 

11(5) SR 8017, Widen and Reconstruct, I-95,
12Wheasheaf Lane to Orthodox Street,
13City of Philadelphia, Project ID 79904

 

14Project Allocation

51,755,000

15(Base Project Allocation -
16$51,755,000)

 

17(6) Swanson Street, Reconstruction,
18Snyder Avenue Intersection, City of
19Philadelphia, Project ID 70231

 

20Project Allocation

2,520,000

21(Base Project Allocation - $2,520,000)

 

22(7) SR 0095, Reconstruction and Widening,
23I-95 from Tioga Street to the Railroad
24Bridge South of Frankford Creek, City
25of Philadelphia, Project ID 79912

 

26Project Allocation

41,605,000

27(Base Project Allocation -
28$38,963,000)

 

29(Land Allocation - $2,642,000)

 

30(8) SR 8019, Ramp Reconfiguration, I-95,

 

1Betsy Ross Bridge Ramps, City of
2Philadelphia, Project ID 79903

 

3Project Allocation

14,303,000

4(Base Project Allocation -
5$14,240,000)

 

6(Land Allocation - $63,000)

 

7(9) SR 0095, Widening and Reconstruction,
8I-95 from just North of Margaret
9Street to Kennedy Street, City of
10Philadelphia, Project ID 79910

 

11Project Allocation

19,286,000

12(Base Project Allocation -
13$19,286,000)

 

14(10) SR 2009, Interchange Improvement,
15Segments 2009/0070 through 2009/0090,
16City of Philadelphia, Project ID 87784

 

17Project Allocation

66,000,000

18(Base Project Allocation -
19$66,000,000)

 

20(11) SR 2001, Restoration, Segments
212001/0050 through 2001/0131, City of
22Philadelphia, Project ID 88397

 

23Project Allocation

6,000,000

24(Base Project Allocation - $6,000,000)

 

25(12) SR 1009, Safety Improvements,
26Bustleton Avenue from Benton Avenue to
27County Line, City of Philadelphia,
28Project ID 95451

 

29Project Allocation

2,550,000

30(Base Project Allocation - $1,550,000)

 

1(Design & Contingencies - $1,000,000)

 

2(13) SR 1009, Safety Improvements,
3Bustleton Avenue from Frankford Avenue
4to Tustin Street, City of
5Philadelphia, Project ID 95452

 

6Project Allocation

2,000,000

7(Base Project Allocation - $1,000,000)

 

8(Design & Contingencies - $1,000,000)

 

9(14) SR 1004, Erie Avenue, Safety
10Improvement, Broad Street to K Street,
11City of Philadelphia, Project ID 85419

 

12Project Allocation

3,565,000

13(Base Project Allocation - $3,565,000)

 

14(15) SR 0095, Widening and
15Reconstruction, I-95 from Kennedy
16Street to Levick Street, City of
17Philadelphia, Project ID 79908

 

18Project Allocation

8,300,000

19(Base Project Allocation - $8,300,000)

 

20(16) SR 3013, Safety Improvements, Island
21Avenue, Elmwood to Suffolk, City of
22Philadelphia, Project ID 17697

 

23Project Allocation

8,260,000

24(Base Project Allocation - $8,260,000)

 

25(17) SR 0095, Widen and Reconstruct, I-95
26from Tie-in W/Section GIR to End of
27Westmoreland Viaduct, City of
28Philadelphia, Project ID 79911

 

29Project Allocation

2,078,000

30(Base Project Allocation - $1,558,000)

 

1(Land Allocation - $520,000)

 

2(18) SR 4004 Olney Avenue, Safety
3Improvement, Broad Street to Rising
4Sun, City of Philadelphia, Project ID
585415

 

6Project Allocation

2,839,000

7(Base Project Allocation - $2,839,000)

 

8(19) SR 3009 and SR 4001, Corridor Safety
9Improvement, Henry Avenue, City of
10Philadelphia, Project ID 80104

 

11Project Allocation

8,524,000

12(Base Project Allocation - $8,524,000)

 

13(20) SR 2016, Safety Improvement, SR 2016
14Corridor, City of Philadelphia,
15Project ID 85417

 

16Project Allocation

4,291,000

17(Base Project Allocation - $4,291,000)

 

18(21) SR 3018, Safety Improvements,
19Haverford Avenue from Lancaster Avenue
20to City Avenue, City of Philadelphia,
21Project ID 57897

 

22Project Allocation

2,315,000

23(Base Project Allocation - $2,201,000)

 

24(Design & Contingencies - $114,000)

 

25(22) Tyson Avenue, Safety Improvement,
26Rising Sun to Torresdale, City of
27Philadelphia, Project ID 48195

 

28Project Allocation

3,636,000

29(Base Project Allocation - $3,636,000)

 

30(23) SR 3014, Highway Portion Bridge

 

1Rehabilitation, SR 3014 (Spring Garden
2Street) over Schuylkill River, City of
3Philadelphia, Project ID 90096

 

4Project Allocation

1,661,000

5(Base Project Allocation - $1,473,000)

 

6(Land Allocation - $71,000)

 

7(Design & Contingencies - $117,000)

 

8(24) SR 3007, Intermodal Services,
9Segments 3007/0030 through 3007/0031,
10City of Philadelphia, Project ID 84649

 

11Project Allocation

3,575,000

12(Base Project Allocation - $3,575,000)

 

13(25) SR 0611, Safety Improvement,
14Segments 0611/0130, City of
15Philadelphia, Project ID 66334

 

16Project Allocation

16,750,000

17(Base Project Allocation -
18$16,750,000)

 

19(26) I-95, Reconstruction, I-95 from the
20Delaware County Line to the Bucks
21County Line, Various Municipalities,
22Project ID 0

 

23Project Allocation

87,000,000

24(Base Project Allocation -
25$87,000,000)

 

26(27) I-76, Reconstruction, I-76 from the
27Montgomery County Line to the New
28Jersey State Line, Various
29Municipalities, Project ID 0

 

30Project Allocation

31,200,000

1(Base Project Allocation -
2$31,200,000)

 

3(28) I-95, Drainage Improvements, I-95
4Corridor, City of Philadelphia,
5Project ID 102309

 

6Project Allocation

500,000

7(Base Project Allocation - $500,000)

 

8(29) SR 0001, SR 6001, Resurface,
9Roosevelt Boulevard (SR 0001 and SR
106001 Both Directions) from Harbison
11Avenue (SR 2009) to the Bucks County
12Line, City of Philadelphia, Project ID
13102388

 

14Project Allocation

9,020,000

15(Base Project Allocation - $9,000,000)

 

16(Design & Contingencies - $20,000)

 

17(30) I-676 from its Western Terminus at
18I-76 to the New Jersey State Line,
19Various Municipalities, Project ID 0

 

20Project Allocation

8,800,000

21(Base Project Allocation - $8,800,000)

 

22(31) I-95, Intelligent Transportation
23Systems, I-95 Corridor, City of
24Philadelphia, Project ID 102305

 

25Project Allocation

600,000

26(Base Project Allocation - $600,000)

 

27(32) SR 0076, SR 3003, Resurface,
28Schuylkill Expressway (I-76 Both
29Directions) from Grays Ferry Avenue to
30Oregon Avenue and SR 3003 Slip Ramp

 

1from 34th to I-76 Eastbound, City of
2Philadelphia, Project ID 102389

 

3Project Allocation

1,520,000

4(Base Project Allocation - $1,500,000)

 

5(Design & Contingencies - $20,000)

 

6(33) Various, Reconstruct, Lincoln Avenue
7and Ridge to Wissahickon, City of
8Philadelphia, Project ID 57901

 

9Project Allocation

8,283,000

10(Base Project Allocation - $8,283,000)

 

11Section 352. Pike County.

12Projects are as follows:

 

13(1) (Reserved).

 

14(2) SR 0084, Interstate Reconstruction,
15I-84 from Exit 26 to Exit 34, Blooming
16Grove and Palmyra Townships, Project
17ID 87795

 

18Project Allocation

16,583,000

19(Base Project Allocation -
20$16,064,000)

 

21(Design & Contingencies - $519,000)

 

22(3) SR 0402, Highway Surface Treatment,
23SR 0402 from SR 0006 to Monroe County
24Line, Blooming Grove and Porter
25Townships, Project ID 91218

 

26Project Allocation

8,279,000

27(Base Project Allocation - $8,278,000)

 

28(Design & Contingencies - $1,000)

 

29(4) SR 0739, Safety Improvements,
30Reconstruction Shoulders, Rumble

 

1Strips, SR 0739 from SR 2006 (Log
2Tavern Road) to 1 Mile North of
3Conashaugh Lakes Road, Blooming Grove
4Township, Project ID 94686

 

5Project Allocation

493,000

6(Base Project Allocation - $225,000)

 

7(Land Allocation - $232,000)

 

8(Design & Contingencies - $36,000)

 

9(5) SR 1013, Slope Repair, SR 1013
10(Cummins Hill Road), Westfall
11Township, Project ID 96807

 

12Project Allocation

1,100,000

13(Base Project Allocation - $816,000)

 

14(Design & Contingencies - $284,000)

 

15(6) SR 2004, Slope Repair, SR 2004
16(Silver Lake Road), Delaware and
17Porter Townships, Project ID 96805

 

18Project Allocation

271,000

19(Base Project Allocation - $201,000)

 

20(Design & Contingencies - $70,000)

 

21(7) SR 1017, Slope Repair, SR 1017
22(Delaware Drive), Westfall Township,
23Project ID 96803

 

24Project Allocation

1,073,000

25(Base Project Allocation - $796,000)

 

26(Design & Contingencies - $277,000)

 

27(8) SR 0434, Slope Repair, SR 0434
28(Shohola Road), Shohola Township,
29Project ID 96802

 

30Project Allocation

1,122,000

1(Base Project Allocation - $662,000)

 

2(Design & Contingencies - $460,000)

 

3(9) SR 2002, Slope Repair, SR 2002
4(Wilson Hill Road), Delaware Township,
5Project ID 96806

 

6Project Allocation

269,000

7(Base Project Allocation - $199,000)

 

8(Design & Contingencies - $70,000)

 

9(10) SR 1014, Slope Repair, SR 1014
10(Masthope Road), Lackawaxen Township,
11Project ID 96808

 

12Project Allocation

965,000

13(Base Project Allocation - $450,000)

 

14(Land Allocation - $65,000)

 

15(Design & Contingencies - $450,000)

 

16(11) SR 0739, Safety Improvements,
17Reconstruction Shoulders, Rumble
18Strips, SR 0739 from I-84 Interchange
19to SR 0006, Blooming Grove Township,
20Project ID 92900

 

21Project Allocation

836,000

22(Base Project Allocation - $540,000)

 

23(Land Allocation - $260,000)

 

24(Design & Contingencies - $36,000)

 

25(12) SR 0084, Highway Portion Bridge
26Rehabilitation, SR 0084, over Delaware
27River, Matamoras Borough, Project ID
289381

 

29Project Allocation

18,689,000

30(Base Project Allocation -

 

1$17,937,000)

 

2(Land Allocation - $35,000)

 

3(Design & Contingencies - $717,000)

 

4(13) SR 0084, Interstate Reconstruction,
5I-84 from Wayne County Line to Exit
634, Green and Palmyra Townships,
7Project ID 76861

 

8Project Allocation

36,526,000

9(Base Project Allocation -
10$36,526,000)

 

11(14) SR 0507, Resurface, Surface
12Treatment, SR 0507, Segments 20
13through 40 and Segments 80 through
14150, Green and Palmyra Townships,
15Project ID 91217

 

16Project Allocation

1,884,000

17(Base Project Allocation - $1,884,000)

 

18(15) I-84, Slope Repair, SR 0084 (Fallen
19Trooper Memorial Highway), Blooming
20Grove Township, Project ID 96801

 

21Project Allocation

357,000

22(Base Project Allocation - $265,000)

 

23(Design & Contingencies - $92,000)

 

24(16) SR 0084, Surface Treatment, I-84
25Westbound Mill/Fill 2014-15, Blooming
26Grove, Dingman and Palmyra Townships,
27Project ID 98237

 

28Project Allocation

6,931,000

29(Base Project Allocation - $6,930,000)

 

30(Design & Contingencies - $1,000)

 

1(17) I-84, Reconstruction, I-84 from the
2Wayne County Line to the New York
3State Line, Various Municipalities,
4Project ID 0

 

5Project Allocation

141,400,000

6(Base Project Allocation -
7$141,400,000)

 

8(18) SR 0590, Shoulder Widening and
9Edgeline Rumble Strips, SR 0590,
10Lackawaxen Township, Project ID 101981

 

11Project Allocation

1,773,000

12(Base Project Allocation - $1,773,000)

 

13(19) SR 0590, Restoration, Surface
14Treatment, SR 0590 in the
15Corresponding Municipalities,
16Lackawaxen and Palmyra Townships,
17Project ID 101992

 

18Project Allocation

6,664,000

19(Base Project Allocation - $6,664,000)

 

20(20) SR 0402, Surface Treatment, Various
21Segments on SR 0402 and SR 0434,
22Various Municipalities, Project ID
2399518

 

24Project Allocation

2,057,000

25(Base Project Allocation - $2,056,000)

 

26(Design & Contingencies - $1,000)

 

27(21) SR 2011, Restoration, Surface
28Treatment, SR 2011, SR 0006, SR 4006,
29in the Corresponding Municipalities,
30Dingman and Lackawaxen Townships,

 

1Matamoras Borough, Westfall Township,
2Project ID 102006

 

3Project Allocation

6,045,000

4(Base Project Allocation - $6,044,000)

 

5(Design & Contingencies - $1,000)

 

6(22) SR 0447, Slope Repair, SR 0447 from
7SR 3012 to T-388, Greene Township,
8Project ID 102029

 

9Project Allocation

978,000

10(Base Project Allocation - $288,000)

 

11(Design & Contingencies - $690,000)

 

12(23) SR 0006, Restoration, Surface
13Treatment, SR 0006 from the Wayne
14County Line to Ninth Street, Blooming
15Grove, Dingman and Lackawaxen
16Townships, Milford Borough, Milford,
17Palmyra and Shohola Townships, Project
18ID 101930

 

19Project Allocation

5,360,000

20(Base Project Allocation - $5,359,000)

 

21(Design & Contingencies - $1,000)

 

22(24) SR 0402, Resurface, Monroe County
23Line to Delaware Forest State Road,
24Porter Township, Project ID 102355

 

25Project Allocation

1,781,000

26(Base Project Allocation - $1,781,000)

 

27(25) SR 0590 and SR 2004, Restoration,
28Surface Treatment, SR 0590 from SR
294010 to SR 4003 and SR 2004 from SR
300402 to SR 0739, Delaware, Lackawaxen

 

1and Porter Townships, Project ID
2102070

 

3Project Allocation

5,937,000

4(Base Project Allocation - $5,937,000)

 

5(26) SR 1005 Various, Restoration,
6Surface Treatment, SR 1005, SR 0213,
7SR 4004, SR 4010 in the Corresponding
8Municipalities, Blooming Grove,
9Dingman, Lackawaxen, Milford and
10Shohola Townships, Project ID 102077

 

11Project Allocation

5,117,000

12(Base Project Allocation - $5,116,000)

 

13(Design & Contingencies - $1,000)

 

14(27) SR 1012, Various Restoration,
15Surface Treatment, SR 1012 from SR
160590 to SR 0434, SR 1002 from US 6 to
17SR 0434, SR 3006 from SR 0507 to
18Ramble Lane, SR 2009 from SR 0209 to
19SR 2001, SR 2003 from High School
20Entrance Road to SR 0402 and SR 2002
21from SR 2001 to SR 0209, Delaware,
22Dingman, Greene, Lackawaxen, Lehman,
23Porter and Shohola Townships, Project
24ID 102017

 

25Project Allocation

5,761,000

26(Base Project Allocation - $5,760,000)

 

27(Design & Contingencies - $1,000)

 

28Section 353. Potter County.

29Projects are as follows:

 

30(1) (Reserved).

 

1(2) SR 2024, Highway Restoration, SR 2002
2Segments 0010/0000 to 0130/0000, West
3Branch Township, Project ID 88289

 

4Project Allocation

650,000

5(Base Project Allocation - $650,000)

 

6(3) SR 0044, Resurface, SR 0044 from
7Heuser Road to US Route 6, Segments
80250/1100 to 0654/0000, Abbott,
9Summit, Sweden and West Branch
10Townships, Project ID 96256

 

11Project Allocation

12,052,000

12(Base Project Allocation -
13$11,600,000)

 

14(Land Allocation - $151,000)

 

15(Design & Contingencies - $301,000)

 

16(4) SR 0607, Resurface, SR 0607 from
17Austin to Keating Summit, Segments
180010/0000 to 0150/0894, Austin
19Borough, Keating and Portage
20Townships, Project ID 96257

 

21Project Allocation

3,001,000

22(Base Project Allocation - $2,500,000)

 

23(Land Allocation - $51,000)

 

24(Design & Contingencies - $450,000)

 

25(5) SR 0049, Highway Reconstruction, SR
260049, SR 0449, SR 0872, SR 1001, SR
271003 and SR 1005 and Various
28Municipalities, Project ID 91096

 

29Project Allocation

3,044,000

30(Base Project Allocation - $3,044,000)

 

1(6) SR 0144, Highway Portion Bridge
2Replacement, SR 0144 over Ives Run,
3Abbott Township, Project ID 91623

 

4Project Allocation

600,000

5(Base Project Allocation - $600,000)

 

6(7) SR 0044, Highway Betterment Project,
7SR 0044, Coudersport Pike, Segments
80910/0000 to 1070/2495, Clara, Hebron
9and Sharon Townships, Shinglehouse
10Borough, Project ID 88285

 

11Project Allocation

1,101,000

12(Base Project Allocation - $901,000)

 

13(Design & Contingencies - $200,000)

 

14(8) SR 2030, Highway Restoration, SR 0044
15Segments 0450/0000 to 0660/0024, West
16Branch, Summit and Sweden Townships,
17Coudersport Borough, Project ID 88286

 

18Project Allocation

1,200,000

19(Base Project Allocation - $1,200,000)

 

20(9) SR 0006, Highway Portion Bridge
21Replacement, SR 0006 over Dingmans
22Run, Coudersport Borough, Project ID
2388640

 

24Project Allocation

2,038,000

25(Base Project Allocation - $1,293,000)

 

26(Land Allocation - $140,000)

 

27(Design & Contingencies - $605,000)

 

28(10) SR 0219, Highway Restoration,
29Cameron County Line to Conrad SR 0872,
30Wharton Township, Project ID 88288

 

1Project Allocation

600,000

2(Base Project Allocation - $600,000)

 

3(11) SR 0244, Resurface, SR 0244, Andrew
4Settlement to Gold, Segments 0210/0000
5to 0360/0000, Allegany and Genesee
6Townships, Project ID 93353

 

7Project Allocation

4,052,000

8(Base Project Allocation - $3,301,000)

 

9(Land Allocation - $301,000)

 

10(Design & Contingencies - $450,000)

 

11(12) SR 0144, Resurface, SR 0144,
12Germania Station to Galeton Borough,
13Segments 0290/0000 to 0440/0000,
14Abbott Township, Galeton Borough, West
15Branch Township, Project ID 93360

 

16Project Allocation

3,053,000

17(Base Project Allocation - $2,501,000)

 

18(Land Allocation - $201,000)

 

19(Design & Contingencies - $351,000)

 

20(13) SR 0006, Betterment Project, SR 0006
21(Main Street), From SR 3017 (Chestnut
22Street) to Ludwig Lane, Segments
230250/1119 to 0270/0675, Coudersport
24Borough, Project ID 92993

 

25Project Allocation

871,000

26(Base Project Allocation - $871,000)

 

27(14) SR 0044 and SR 0144, Widening,
28Resurfacing, Drainage and Guiderail
29Improvements, SR 0044 Segments
300010/0000 to 0654/0000, SR 0144

 

1Segments 0010/0000 to 0430/0000,
2Various Municipalities, Project ID
396026

 

4Project Allocation

22,300,000

5(Base Project Allocation -
6$22,300,000)

 

7(15) SR 0044, Highway Resurfacing, SR
80044 from Tioga County Line to Kettle
9Creek, Segments 0010/0000 to
100130/2364, Stewardson Township,
11Project ID 93350

 

12Project Allocation

4,052,000

13(Base Project Allocation - $3,601,000)

 

14(Land Allocation - $150,000)

 

15(Design & Contingencies - $301,000)

 

16(16) SR 0049, Highway Resurfacing, SR
170049 from SR 0044 to Gold, Segments
180010/0000 to 0230/0000, Allegany,
19Eulalia, Hebron and Ulysses Townships,
20Project ID 93351

 

21Project Allocation

8,701,000

22(Base Project Allocation - $8,000,000)

 

23(Land Allocation - $250,000)

 

24(Design & Contingencies - $451,000)

 

25(17) SR 0219, Highway Restoration,
26Galeton to Tioga County Line, SR 0006,
27Galeton Borough, Pike Township,
28Project ID 88287

 

29Project Allocation

300,000

30(Base Project Allocation - $300,000)

 

1(18) SR 4017, Safety Improvements, SR
20044, Segments 0410/1671 to 0430/0374,
3Abbott and West Branch Townships,
4Project ID 88212

 

5Project Allocation

400,000

6(Base Project Allocation - $100,000)

 

7(Land Allocation - $100,000)

 

8(Design & Contingencies - $200,000)

 

9(19) SR 0006, Resurface, US 6 from Mina
10to Coudersport, Segments 0160/0000 to
110210/0905, Eulalia Township, Project
12ID 96268

 

13Project Allocation

1,065,000

14(Base Project Allocation - $1,065,000)

 

15(20) SR 0006, Resurface, US 6 from West
16Pike (SR 1025) to Stockpile, Segments
170670/0000 to 0720/1021, Pike and
18Ulysses Townships, Project ID 96269

 

19Project Allocation

951,000

20(Base Project Allocation - $951,000)

 

21(21) SR 0872, Highway Betterment, SR
220872, Segments 0300 to 0530, Eulalia,
23Homer and Keating Townships and Austin
24Borough, Project ID 91104

 

25Project Allocation

10,000,000

26(Base Project Allocation -
27$10,000,000)

 

28(22) SR 0006, Resurface, US 6 from
29Fessenden Road to Village of Mina,
30Segments 0110/0000 to 0160/0000,

 

1Eulalia and Roulette Townships,
2Project ID 96267

 

3Project Allocation

1,034,000

4(Base Project Allocation - $1,034,000)

 

5(23) SR 0006, Highway Restoration, SR
60006 and SR 4023, Various
7Municipalities, Project ID 91101

 

8Project Allocation

8,651,000

9(Base Project Allocation - $8,651,000)

 

10(24) SR 0006, Resurface, SR 0006 from the
11McKean County Line to Fishing Creek,
12Segments 0010/0000 to 0060/0000,
13Roulette Township, Project ID 100555

 

14Project Allocation

516,000

15(Base Project Allocation - $516,000)

 

16(25) SR 3001, Betterment (Restoration),
17SR 3000 Quad Routes, Various, Project
18ID 101940

 

19Project Allocation

20,785,000

20(Base Project Allocation -
21$20,635,000)

 

22(Design & Contingencies - $150,000)

 

23(26) SR 4001, Betterment (Restoration),
24SR 4000 Quad Routes, Various, Project
25ID 101941

 

26Project Allocation

31,892,000

27(Base Project Allocation -
28$31,741,000)

 

29(Design & Contingencies - $151,000)

 

30(27) SR 0872, Betterment (Restoration),

 

1PA 0872, Coudersport Borough, Eulalia
2Township, Project ID 101890

 

3Project Allocation

1,266,000

4(Base Project Allocation - $1,116,000)

 

5(Design & Contingencies - $150,000)

 

6(28) SR 0449, Resurface, SR 0449
7(Brookland Road) from SR 0006 to SR
80049, Segments 0010/0000 to 0160/2573,
9Ulysses Township, Project ID 101049

 

10Project Allocation

2,500,000

11(Base Project Allocation - $2,500,000)

 

12(29) SR 0044, Resurface, SR 0044
13(Coudersport Pike) from Coudersport
14Borough toward SR 0049, Segments
150660/0000 to 0710/2930, Coudersport
16Borough, Eulalia Township, Project ID
17101046

 

18Project Allocation

2,000,000

19(Base Project Allocation - $2,000,000)

 

20(30) SR 0449, Resurface, SR 0449
21(Brookland Road) from SR 0049 to the
22New York State Line, Segments
230170/0000 to 0370/2444, Allegany,
24Genesee and Ulysses Townships, Project
25ID 101040

 

26Project Allocation

6,000,000

27(Base Project Allocation - $6,000,000)

 

28(31) SR 0872, Resurface, SR 0872 from
29Wharton (Intersection with SR 0006)
30North to SR 3003, Segments 0110/0000

 

1to 0530/1523, Austin Borough, Eulalia,
2Homer, Keating, Portage, Sylvania and
3Wharton Townships, Project ID 101032

 

4Project Allocation

12,703,000

5(Base Project Allocation -
6$11,601,000)

 

7(Land Allocation - $401,000)

 

8(Design & Contingencies - $701,000)

 

9(32) SR 0144, Resurface, SR 0144 from
10Carter Camp (Intersection with SR
110044) North to Germania, Segments
120210/0000 to 0290/0000, Abbott
13Township, Project ID 101029

 

14Project Allocation

1,300,000

15(Base Project Allocation - $1,300,000)

 

16(33) SR 0155, Resurface, SR 0155 from the
17Cameron County Line to the McKean
18County Line, Segments 0010/0000 to
190170/2552, Keating and Portage
20Townships, Project ID 101025

 

21Project Allocation

2,712,000

22(Base Project Allocation - $2,712,000)

 

23(34) SR 0144, Resurface, SR 0144 from
24Tributary of Kettle Creek to Oleona,
25Segments 0130/0000 to 0210/0000,
26Stewardson Township, Project ID 101021

 

27Project Allocation

1,480,000

28(Base Project Allocation - $1,480,000)

 

29(35) SR 0144, Resurface, SR 0144 from
30Clinton County Line to Oleona,

 

1Segments 0010/0000 to 0130/0000,
2Stewardson Township, Project ID 101017

 

3Project Allocation

1,985,000

4(Base Project Allocation - $1,985,000)

 

5(36) SR 0006, Resurface, SR 0006 from SR
63006 to SR 0044, Segments 0360/0000 to
70390/0000, Eulalia and Sweden
8Townships, Project ID 100561

 

9Project Allocation

483,000

10(Base Project Allocation - $483,000)

 

11(37) SR 0244, Resurface, SR 0244 from
12Coneville to Woodville, Segments
130010/0000 to 0110/0000, Hebron
14Township, Oswayo Borough and Oswayo
15Township, Project ID 101006

 

16Project Allocation

1,700,000

17(Base Project Allocation - $1,700,000)

 

18(38) SR 0006, Resurface, SR 0006 in
19Galeton, Segments 0750/0200 to
200780/0000, Galeton Borough, Pike
21Township, Project ID 100572

 

22Project Allocation

432,000

23(Base Project Allocation - $432,000)

 

24(39) SR 2005, Betterment (Restoration),
25SR 2000 Quad Routes, Abbott,
26Stewardson and West Branch Townships,
27Project ID 101939

 

28Project Allocation

300,000

29(Base Project Allocation - $150,000)

 

30(Design & Contingencies - $150,000)

 

1(40) SR 0006, Resurface, SR 0006 from
2Fishing Creek Toward Mina, Segments
30060/0000 to 0110/0000, Roulette
4Township, Project ID 100556

 

5Project Allocation

800,000

6(Base Project Allocation - $800,000)

 

7(41) SR 0244, Resurface, SR 0244 Near
8Woodville to Andrews Settlement,
9Segments 0110/0000 to 0210/0957,
10Allegany, Genesee and Hebron
11Townships, Oswayo Borough and Oswayo
12Township, Project ID 101012

 

13Project Allocation

1,600,000

14(Base Project Allocation - $1,600,000)

 

15(42) SR 0006, Resurface, SR 0006 from
16Nine Mile Run Bridge to Leek Hollow
17Run, Segments 0550/0108 to 0630/0000,
18Ulysses Township, Project ID 100569

 

19Project Allocation

1,000,000

20(Base Project Allocation - $1,000,000)

 

21(43) SR 0049, Resurface, SR 0049 from
22Mills to the Tioga County Line,
23Segments 0430/0000 to 0510/3207,
24Harrison Township, Project ID 100599

 

25Project Allocation

2,000,000

26(Base Project Allocation - $2,000,000)

 

27(44) SR 1001, Betterment (Restoration),
28SR 1000 Quad Routes, Various, Project
29ID 101938

 

30Project Allocation

34,745,000

1(Base Project Allocation -
2$34,595,000)

 

3(Design & Contingencies - $150,000)

 

4(45) SR 0044, Resurface, SR 0044 from SR
50049 to Coneville, Segments 0720/0000
6to 0900/0000, Eulalia and Hebron
7Townships, Project ID 100577

 

8Project Allocation

3,600,000

9(Base Project Allocation - $3,600,000)

 

10(46) SR 0006, Betterment (Restoration),
11US 6, Coudersport Borough, Eulalia and
12Ulysses Townships, Project ID 101891

 

13Project Allocation

2,570,000

14(Base Project Allocation - $2,420,000)

 

15(Design & Contingencies - $150,000)

 

16(47) SR 0044, Resurface, SR 0044 from
17Coneville to McKean County Line,
18Segments 0900/0000 to 1090/2173,
19Clara, Hebron and Sharon Townships,
20Shinglehouse Borough, Project ID
21100584

 

22Project Allocation

3,768,000

23(Base Project Allocation - $3,568,000)

 

24(Design & Contingencies - $200,000)

 

25(48) SR 0049, Resurface, SR 0049 from
26Gold to Mills, Segments 0230/0000 to
270430/0000, Bingham and Harrison
28Townships, Ulysses Borough, Ulysses
29Township, Project ID 100587

 

30Project Allocation

3,815,000

1(Base Project Allocation - $3,815,000)

 

2(49) SR 0006, Resurface, SR 0006 from SR
30044 to State Police Road, Segments
40390/0000 to 0470/0000, Sweden
5Township, Project ID 100566

 

6Project Allocation

1,600,000

7(Base Project Allocation - $1,600,000)

 

8(50) Various, Resurface, SR 4014, SR 4021
9and SR 4023, Oswayo and Sharon
10Townships and Shinglehouse Borough,
11Project ID 96094

 

12Project Allocation

2,702,000

13(Base Project Allocation - $2,501,000)

 

14(Design & Contingencies - $201,000)

 

15Section 354. Schuylkill County.

16Projects are as follows:

 

17(1) (Reserved).

 

18(2) SR 0061, Highway Reconstruction, PA
1961 from Saint Clair Borough to
20Frackville Borough, Blythe, New
21Castle, Ryan and West Mahanoy
22Townships, Project ID 96470

 

23Project Allocation

41,563,000

24(Base Project Allocation -
25$33,513,000)

 

26(Land Allocation - $2,300,000)

 

27(Design & Contingencies - $5,750,000)

 

28(3) SR 0061, Highway Restoration, SR
290061, from 2014 to Penn State
30University, North Manheim Township,

 

1Orwigsburg and Schuylkill Haven
2Boroughs, West Brunswick Township,
3Project ID 91112

 

4Project Allocation

5,041,000

5(Base Project Allocation - $5,000,000)

 

6(Design and Contingencies - $41,000)

 

7(4) SR 0924, Highway Resurface, Gold Star
8Highway/Main Street (SR 0924) from
9Frackville to Ringtown Boulevard,
10Gilberton Borough, Mahanoy Township,
11Shenandoah Borough, West Mahanoy
12Township, Project ID 93710

 

13Project Allocation

9,101,000

14(Base Project Allocation - $9,100,000)

 

15(Design & Contingencies - $1,000)

 

16(5) SR 0339, Highway Portion Bridge
17Replacement, PA 339 over Catawissa
18Creek, North Union Township, Project
19ID 12717

 

20Project Allocation

788,000

21(Base Project Allocation - $777,000)

 

22(Land Allocation - $4,000)

 

23(Design & Contingencies - $7,000)

 

24(6) SR 0209, Highway Portion Bridge
25Rehabilitation, US 209 over West
26Branch Schuylkill River, Branch
27Township, City of Pottsville, Project
28ID 92022

 

29Project Allocation

602,000

30(Base Project Allocation - $600,000)

 

1(Land Allocation - $1,000)

 

2(Design & Contingencies - $1,000)

 

3(7) SR 0209, Resurface, US 209, Blythe
4Township, Middleport Borough,
5Schuylkill Township, Tamaqua Borough,
6Walker Township, Project ID 96446

 

7Project Allocation

10,001,000

8(Base Project Allocation -
9$10,000,000)

 

10(Design & Contingencies - $1,000)

 

11(8) SR 2003, Highway Portion Bridge
12Replacement, SR 2003 over Pine Creek,
13West Brunswick Township, Project ID
1489618

 

15Project Allocation

1,502,000

16(Base Project Allocation - $1,500,000)

 

17(Land Allocation - $1,000)

 

18(Design & Contingencies - $1,000)

 

19(9) SR 0054, Highway Resurface, Center
20Street (SR 0054), Mahanoy Township,
21Shenandoah Borough and West Mahanoy
22Township, Project ID 83097

 

23Project Allocation

2,501,000

24(Base Project Allocation - $2,500,000)

 

25(Design & Contingencies - $1,000)

 

26(10) SR 0125, Highway Portion Bridge
27Rehabilitation, PA 125 over Mahantango
28Creek, Eldred Township, Project ID
2989638

 

30Project Allocation

1,002,000

1(Base Project Allocation - $1,000,000)

 

2(Land Allocation - $1,000)

 

3(Design & Contingencies - $1,000)

 

4(11) SR 0061, Highway Reconstruction,
5with Drainage, Guiderail, Shoulders,
6ADA Ramps, SR 0061, Segments 0210
7through 0240 from Penn State
8University in Schuylkill Haven to past
9SR 2014, North Manheim Township,
10Schuylkill Haven Borough, Project ID
1188387

 

12Project Allocation

1,200,000

13(Base Project Allocation - $1,200,000)

 

14(12) SR 0443, Highway Resurface, Market
15Street (SR 0443) from PA 61 to Hope
16Avenue, North Manheim Township,
17Orwigsburg Borough, Project ID 95577

 

18Project Allocation

2,001,000

19(Base Project Allocation - $2,000,000)

 

20(Design & Contingencies - $1,000)

 

21(13) SR 0309, Highway Resurface, PA 309
22from Ye Olde Dam Road to the Carbon
23County Line, Kline Township, McAdoo
24Borough, Rush Township, Project ID
2596484

 

26Project Allocation

4,952,000

27(Base Project Allocation - $4,950,000)

 

28(Land Allocation - $1,000)

 

29(Design & Contingencies - $1,000)

 

30(14) SR 0061, Highway Reconstruction, PA

 

161 from North of Schuylkill Haven
2through Saint Clair Borough, East
3Norwegian, New Castle, North Manheim
4and Norwegian Townships, Pala Alto
5Borough, City of Pottsville, Saint
6Clair Borough, Project ID 96565

 

7Project Allocation

24,933,000

8(Base Project Allocation -
9$24,932,000)

 

10(Design & Contingencies - $1,000)

 

11(15) SR 0209, Intersection Safety
12Improvement, SR 0209-SR 0901
13Intersection, Branch Township, Project
14ID 97267

 

15Project Allocation

300,000

16(Design & Contingencies - $300,000)

 

17(16) SR 0309, Roadway Rehabilitation, SR
180309 from T-779 (School Drive) in West
19Penn Township to T-503 (Owl Creek
20Drive), Tamaqua Borough, West Penn
21Township, Project ID 96441

 

22Project Allocation

17,002,000

23(Base Project Allocation -
24$17,001,000)

 

25(Design & Contingencies - $1,000)

 

26(17) SR 0309, Highway Portion Bridge
27Replacement, SR 0309 over Backfilled
28Channel, Kline Township, Project ID
2985743

 

30Project Allocation

1,002,000

1(Base Project Allocation - $1,000,000)

 

2(Land Allocation - $1,000)

 

3(Design & Contingencies - $1,000)

 

4(18) SR 4016, Highway Portion Bridge
5Replacement, SR 4016 over Mahantango
6Creek, Upper Mahantango Township,
7Project ID 85724

 

8Project Allocation

1,002,000

9(Base Project Allocation - $1,000,000)

 

10(Land Allocation - $1,000)

 

11(Design & Contingencies - $1,000)

 

12(19) SR 4026, Highway Portion Bridge
13Rehabilitation, SR 4026 over Mahanoy
14Creek, Butler Township, Project ID
1585718

 

16Project Allocation

802,000

17(Base Project Allocation - $800,000)

 

18(Land Allocation - $1,000)

 

19(Design & Contingencies - $1,000)

 

20(20) SR 0309, Highway Resurface, PA 309
21from Lehigh County Line to School
22Drive, West Penn Township, Project ID
2396471

 

24Project Allocation

6,001,000

25(Base Project Allocation - $6,000,000)

 

26(Design & Contingencies - $1,000)

 

27(21) SR 0209, Resurface, US 209 from Coal
28Street to Lehigh Street in Middleport
29Borough, Schuylkill, Walker, and
30Blythe Townships, Middleport Borough,

 

1Schuylkill Township, Tamaqua Borough,
2Walker Township, Project ID 101626

 

3Project Allocation

2,051,000

4(Base Project Allocation - $2,001,000)

 

5(Design & Contingencies - $50,000)

 

6(22) SR 0443, Resurface, SR 2006, Lincoln
7Avenue to Route 895, New Ringgold and
8Orwigsburg Boroughs, Walker, West
9Brunswick, West Penn and East
10Brunswick Townships, Project ID 101613

 

11Project Allocation

2,050,000

12(Base Project Allocation - $2,000,000)

 

13(Design & Contingencies - $50,000)

 

14(23) I-81, Reconstruction, I-81 from the
15Lebanon County Line to the Luzerne
16County Line, Various Municipalities,
17Project ID 0

 

18Project Allocation

171,600,000

19(Base Project Allocation -
20$171,600,000)

 

21Section 355. Snyder County.

22Projects are as follows:

 

23(1) (Reserved).

 

24(2) SR 0522, Mill and Resurface Roadway,
25SR 0522 from Kern Run to Wetzel Run,
26Beaver Township, Segments/Offset
270210/0000 to 0230/1280, Beaver
28Township, Beavertown Borough, Project
29ID 87846

 

30Project Allocation

976,000

1(Base Project Allocation - $947,000)

 

2(Design & Contingencies - $29,000)

 

3(3) SR 0522, Mill and Resurface Roadway,
4SR 0522 from Elm Street to Kern Run,
5Segments 0180/0000 to 0200/2372,
6Beaver Township, Project ID 87850

 

7Project Allocation

594,000

8(Base Project Allocation - $581,000)

 

9(Design & Contingencies - $13,000)

 

10(4) SR 0015, Highway Portion Bridge
11Rehabilitation, US 15 over Tributary
12of Susquehanna River, BMS 54-0015-
130070-0148, Monroe Township, Project ID
1497629

 

15Project Allocation

1,123,000

16(Base Project Allocation - $921,000)

 

17(Land Allocation - $101,000)

 

18(Design & Contingencies - $101,000)

 

19(5) SR 0011, Mill and Resurface Roadway,
20SR 0011, Segments 0240/0300 to
210310/1725, Monroe and Penn Townships,
22Selinsgrove Borough, Union Township,
23Project ID 87900

 

24Project Allocation

570,000

25(Base Project Allocation - $570,000)

 

26(6) SR 0015, Highway Portion Bridge
27Rehabilitation, US 15 over Tributary
28of Susquehanna River, Monroe Township,
29Project ID 97626

 

30Project Allocation

1,123,000

1(Base Project Allocation - $921,000)

 

2(Land Allocation - $101,000)

 

3(Design & Contingencies - $101,000)

 

4(7) SR 0011, Mill and Resurface Roadway,
5US 11 from 522 to Roosevelt Avenue,
6Segments/Offset 0320/0000 to 0330/1943
7and 0321/0000 to 0331/2143, Monroe
8Township, Project ID 87896

 

9Project Allocation

214,000

10(Base Project Allocation - $189,000)

 

11(Design & Contingencies - $25,000)

 

12(8) SR 0104, Mill and Resurface Roadway,
13SR 0104, Segments 0160/2388 to
140250/1100, Franklin Township,
15Middleburg Borough, Perry and
16Washington Townships, Project ID 87889

 

17Project Allocation

3,001,000

18(Base Project Allocation - $2,961,000)

 

19(Design & Contingencies - $40,000)

 

20(9) SR 0011, Mill and Resurface, SR 0011,
21Segments 0241/0000 to 0311/2884,
22Monroe and Penn Township, Selinsgrove
23Borough, Union Township, Project ID
2487902

 

25Project Allocation

720,000

26(Base Project Allocation - $720,000)

 

27(10) SR 0235, Mill and Resurface, SR
280235, Segments 0080/0757 to 0110/2244,
29Spring Township, Project ID 87888

 

30Project Allocation

593,000

1(Base Project Allocation - $573,000)

 

2(Design & Contingencies - $20,000)

 

3(11) SR 0522, Resurface Roadway, SR 0522
4from McClure to West Beaver Township
5Line, Segments/Offset 0070/0400 to
60110/0500, Spring and West Beaver
7Townships, Project ID 87239

 

8Project Allocation

510,000

9(Base Project Allocation - $500,000)

 

10(Design & Contingencies - $10,000)

 

11(12) SR 0235, Mill and Resurface Roadway,
12SR 0235, Segments 0010/0000 to
130080/0757, Spring, West Beaver and
14West Perry Townships, Project ID 87893

 

15Project Allocation

1,563,000

16(Base Project Allocation - $1,550,000)

 

17(Design & Contingencies - $13,000)

 

18(13) SR 3006, Roadway Sinkhole Repair, SR
193006, Segments/Offset 0100/0167, West
20Perry Township, Project ID 88052

 

21Project Allocation

35,000

22(Design & Contingencies - $35,000)

 

23(14) SR 2017, Mill and Resurface, SR 2017
24from Sand Hill Road to SR 0522, SR
252017, Segments 0030/1375 to 0070/1853,
26Snyder County, Penn Township and
27Selinsgrove Borough, Project ID 88942

 

28Project Allocation

688,000

29(Base Project Allocation - $609,000)

 

30(Design & Contingencies - $79,000)

 

1(15) SR 0015, Highway Portion Bridge
2Rehabilitation, US 15 over Tributary
3of Carrie Run, BMS 54-0015-0080-0603,
4Monroe Township, Project ID 97631

 

5Project Allocation

1,123,000

6(Base Project Allocation - $921,000)

 

7(Land Allocation - $101,000)

 

8(Design & Contingencies - $101,000)

 

9(16) SR 0522 and SR 1011, Intersection
10Improvement, SR 1011 University Avenue
11Intersection, Penn Township, Project
12ID 91656

 

13Project Allocation

1,110,000

14(Base Project Allocation - $760,000)

 

15(Land Allocation - $100,000)

 

16(Design & Contingencies - $250,000)

 

17(17) SR 0522, Resurface, US 522 from
18Greenhouse Road to Essex Road,
190330/0000 to 0350/2454, Franklin
20Township, Project ID 95905

 

21Project Allocation

311,000

22(Base Project Allocation - $301,000)

 

23(Design & Contingencies - $10,000)

 

24(18) SR 0522, Resurface, US 522 from
25Hillside Drive to US 15, Selinsgrove
26Borough, Segments 0590/1931 to
270614/1565, 0605/0000 to 0615/1602,
28Monroe and Penn Townships, Selinsgrove
29Borough, Project ID 97714

 

30Project Allocation

721,000

1(Base Project Allocation - $700,000)

 

2(Design & Contingencies - $21,000)

 

3(19) SR 4006, Highway Portion Bridge
4Replacement, SR 4006 over Middle
5Creek, BMS 54-4006-0080-2845, Spring
6Township, Project ID 97589

 

7Project Allocation

1,503,000

8(Base Project Allocation - $1,301,000)

 

9(Land Allocation - $101,000)

 

10(Design & Contingencies - $101,000)

 

11(20) SR 0522, Highway Portion Bridge
12Replacement, US 522 over Tributary of
13Middle Creek, Franklin Township,
14Project ID 97590

 

15Project Allocation

1,503,000

16(Base Project Allocation - $1,301,000)

 

17(Land Allocation - $101,000)

 

18(Design & Contingencies - $101,000)

 

19(21) SR 0011, Highway Portion Bridge
20Preservation, US 11, Various
21Municipalities, Project ID 97608

 

22Project Allocation

850,000

23(Base Project Allocation - $800,000)

 

24(Design & Contingencies - $50,000)

 

25(22) SR 0011, Resurface, SR 0011 from US
2615 to Union County Line, Segments
270420/0000 to 0490/0732, Monroe
28Township, Project ID 98922

 

29Project Allocation

1,066,000

30(Base Project Allocation - $990,000)

 

1(Design & Contingencies - $76,000)

 

2(23) SR 1005, Resurface Roadway, SR 1005
3from Middle Creek Township Line to SR
40204, Centre, Jackson and Middle Creek
5Townships, Project ID 98882

 

6Project Allocation

655,000

7(Base Project Allocation - $609,000)

 

8(Design & Contingencies - $46,000)

 

9(24) SR 1014, Resurface Roadway, SR 1014
10from SR 0204 to SR 0011, Monroe and
11Penn Townships, Project ID 98885

 

12Project Allocation

656,000

13(Base Project Allocation - $610,000)

 

14(Design & Contingencies - $46,000)

 

15(25) SR 4016, Highway Portion Bridge
16Replacement, SR 4012 over Tributary of
17North Branch of Middle Creek, BMS 54-
184012-0050-0000, Adams Township,
19Project ID 98661

 

20Project Allocation

275,000

21(Base Project Allocation - $150,000)

 

22(Land Allocation - $60,000)

 

23(Design & Contingencies - $65,000)

 

24(26) SR 3012, Highway Portion Bridge
25Replacement, SR 3012 over Tributary of
26Middle Creek, BMS 54-3012-0086-0000,
27Spring Township, Project ID 98598

 

28Project Allocation

281,000

29(Base Project Allocation - $151,000)

 

30(Land Allocation - $65,000)

 

1(Design & Contingencies - $65,000)

 

2(27) SR 4012, Highway Portion Bridge
3Replacement, SR 4012 over Kreb Gap
4Run, BMS 54-4012-0050-0000, Spring
5Township, Project ID 98589

 

6Project Allocation

243,000

7(Base Project Allocation - $161,000)

 

8(Land Allocation - $41,000)

 

9(Design & Contingencies - $41,000)

 

10(28) SR 3010, Highway Portion Bridge
11Replacement, SR 3010 over Middleworth
12Run, BMS 54-3010-0050-0986, Beaver
13Township, Project ID 98578

 

14Project Allocation

281,000

15(Base Project Allocation - $151,000)

 

16(Land Allocation - $65,000)

 

17(Design & Contingencies - $65,000)

 

18(29) SR 2010, Highway Portion Bridge
19Replacement, SR 2010 over Tributary of
20Middle Creek, BMS 54-2010-0040-1803,
21Washington Township, Project ID 98577

 

22Project Allocation

275,000

23(Base Project Allocation - $150,000)

 

24(Land Allocation - $60,000)

 

25(Design & Contingencies - $65,000)

 

26(30) SR 2006, Highway Portion Bridge
27Replacement, SR 2006 over Tributary of
28Chapman Creek, BMS 54-2006-0110-0000,
29Chapman Township, Project ID 98554

 

30Project Allocation

275,000

1(Base Project Allocation - $150,000)

 

2(Land Allocation - $60,000)

 

3(Design & Contingencies - $65,000)

 

4(31) SR 1011, Highway Portion Bridge
5Replacement, SR 1011 over Tributary of
6Penn's Creek, BMS 54-1011-0080-0231,
7Penn Township, Project ID 98548

 

8Project Allocation

243,000

9(Base Project Allocation - $161,000)

 

10(Land Allocation - $41,000)

 

11(Design & Contingencies - $41,000)

 

12(32) SR 0192, Highway Portion Bridge
13Preservation, Various Bridges on SR
140104 and SR 0192 in Snyder and Union
15Counties, Chapman, Harley and Lewis
16Townships, Project ID 98735

 

17Project Allocation

142,000

18(Base Project Allocation - $121,000)

 

19(Design & Contingencies - $21,000)

 

20(33) SR 0522, Highway Portion Bridge
21Replacement, SR 0522 over South Branch
22of Middle Creek, BMS 54-0522-0040-
230000, McClure Borough, Project ID
2498877

 

25Project Allocation

352,000

26(Land Allocation - $101,000)

 

27(Design & Contingencies - $251,000)

 

28(34) SR 3008, Resurface Roadway, SR 3008
29from SR 3010 to SR 3009, Franklin
30Township, Project ID 98892

 

1Project Allocation

522,000

2(Base Project Allocation - $500,000)

 

3(Design & Contingencies - $22,000)

 

4(35) SR 1005, Resurface Roadway, SR 1005
5from SR 0104 to Middle Creek Township
6Line, Centre and Franklin Townships,
7Middleburg Borough, Project ID 98880

 

8Project Allocation

667,000

9(Base Project Allocation - $622,000)

 

10(Design & Contingencies - $45,000)

 

11(36) SR 0522, Resurface Roadway, SR 0522
12from Beavertown Borough Line to Middle
13Creek, Beaver Township, Project ID
1498911

 

15Project Allocation

155,000

16(Base Project Allocation - $94,000)

 

17(Design & Contingencies - $61,000)

 

18(37) SR 4008, Resurface, SR 4008 from SR
194003 to SR 4006, Segments 0050/0000 to
200150/1285, Spring and West Beaver
21Townships, Project ID 99245

 

22Project Allocation

1,521,000

23(Base Project Allocation - $1,501,000)

 

24(Design & Contingencies - $20,000)

 

25(38) SR 1015, Resurface Roadway, SR 1015
26from SR 0522 to SR 1017, Monroe
27Township, Project ID 98886

 

28Project Allocation

140,000

29(Base Project Allocation - $85,000)

 

30(Design & Contingencies - $55,000)

 

1(39) SR 1019, Resurface Roadway, SR 1019
2from SR 1023 to SR 1017, Monroe
3Township, Shamokin Dam Borough,
4Project ID 98887

 

5Project Allocation

64,000

6(Base Project Allocation - $41,000)

 

7(Design & Contingencies - $23,000)

 

8(40) SR 2006, Resurface Roadway, SR 2006
9from 0.8 Mile West of Orchard Hill
10Road to SR 0011, Chapman, Union and
11Washington Townships, Project ID 98888

 

12Project Allocation

796,000

13(Base Project Allocation - $750,000)

 

14(Design & Contingencies - $46,000)

 

15(41) SR 2009, Resurface Roadway, SR 2009
16from SR 2017 to SR 0035, Penn and
17Union Townships, Project ID 98889

 

18Project Allocation

334,000

19(Base Project Allocation - $311,000)

 

20(Design & Contingencies - $23,000)

 

21(42) SR 2009, Resurface Roadway, SR 2009
22from SR 0035 to Kuster Road, Penn
23Township, Project ID 98891

 

24Project Allocation

170,000

25(Base Project Allocation - $154,000)

 

26(Design & Contingencies - $16,000)

 

27(43) SR 0015, Highway Portion Bridge
28Replacement, SR 0522 over Carrie Run,
29BMS 54-0015-0070-0905, Monroe
30Township, Project ID 98894

 

1Project Allocation

352,000

2(Land Allocation - $101,000)

 

3(Design & Contingencies - $251,000)

 

4(44) SR 0011, Highway Portion Bridge
5Replacement, SR 0011 over Norfolk
6Southern Railroad, BMS 54-0011-0290-
71478, Selinsgrove Borough, Project ID
898898

 

9Project Allocation

451,000

10(Land Allocation - $101,000)

 

11(Design & Contingencies - $350,000)

 

12(45) SR 0011, Highway Portion Bridge
13Replacement, SR 0011 over Norfolk
14Southern Railroad, BMS 54-0011-0291-
151472, Selinsgrove Borough, Project ID
1698900

 

17Project Allocation

451,000

18(Land Allocation - $101,000)

 

19(Design & Contingencies - $350,000)

 

20(46) SR 0015, Highway Portion Bridge
21Replacement, SR 0015 over Tributary of
22Susquehanna River, BMS 54-0015-0060-
232218, Monroe Township, Project ID
2498906

 

25Project Allocation

500,000

26(Land Allocation - $100,000)

 

27(Design & Contingencies - $400,000)

 

28(47) SR 1011, Resurface Roadway, SR 1011
29from Pine Street to Fair Oak Road,
30Penn Township, Selinsgrove Borough,

 

1Project ID 98909

 

2Project Allocation

180,000

3(Base Project Allocation - $110,000)

 

4(Design & Contingencies - $70,000)

 

5(48) SR 0204, Resurface Roadway, SR 0204
6from SR 1014 to SR 1005, Jackson and
7Penn Townships, Project ID 98879

 

8Project Allocation

297,000

9(Base Project Allocation - $182,000)

 

10(Design & Contingencies - $115,000)

 

11(49) SR 0035, Highway Portion Bridge
12Replacement, SR 0035 over Tributary of
13Middle Creek, Washington Township,
14Project ID 99121

 

15Project Allocation

321,000

16(Land Allocation - $100,000)

 

17(Design & Contingencies - $221,000)

 

18(50) SR 0011, Restoration, SR 0011 from
19Juniata County Line to Ulsh Road,
20Chapman and Susquehanna Townships,
21Project ID 99342

 

22Project Allocation

620,000

23(Base Project Allocation - $359,000)

 

24(Design & Contingencies - $261,000)

 

25(51) SR 0011, Replace Highway Lighting,
26SR 0011 at the Port Trevorton
27Jughandle, Union Township, Project ID
2899340

 

29Project Allocation

510,000

30(Base Project Allocation - $500,000)

 

1(Design & Contingencies - $10,000)

 

2(52) SR 0011, Major Guide Sign
3Replacement, SR 0011 in Snyder County,
4Various Municipalities, Project ID
599338

 

6Project Allocation

36,000

7(Base Project Allocation - $25,000)

 

8(Design & Contingencies - $11,000)

 

9(53) SR 0035, Resurface, SR 0035 from PA
10104 to Market Street, Segments
110150/0596 to 0230/0404, Freeburg
12Borough, Perry and Washington
13Townships, Project ID 99219

 

14Project Allocation

981,000

15(Base Project Allocation - $961,000)

 

16(Design & Contingencies - $20,000)

 

17(54) SR 0035, Resurface, SR 0035 from SR
182017 to US 11, Segments 0330/0000 to
190340/0618, 0331/0000 to 0341/0618,
20Penn Township, Project ID 99221

 

21Project Allocation

231,000

22(Base Project Allocation - $211,000)

 

23(Design & Contingencies - $20,000)

 

24(55) SR 0104, Resurface, SR 0104 from PA
2535 to US 522, Segments 0140/0000 to
260250/1489, Franklin Township,
27Middleburg Borough, Perry and
28Washington Townships, Project ID 99223

 

29Project Allocation

1,636,000

30(Base Project Allocation - $1,615,000)

 

1(Design & Contingencies - $21,000)

 

2(56) SR 0235, Resurface, SR 0235 from the
3Juniata County Line to US 522,
4Segments 0080/0757 to 0110/2244,
5Spring Township, Project ID 99225

 

6Project Allocation

1,036,000

7(Base Project Allocation - $1,016,000)

 

8(Design & Contingencies - $20,000)

 

9(57) SR 0011, Major Guide Sign
10Replacement, SR 0011 in Snyder County,
11Various Municipalities, Project ID
1299335

 

13Project Allocation

25,000

14(Base Project Allocation - $20,000)

 

15(Design & Contingencies - $5,000)

 

16(58) SR 0522, Highway Portion Bridge
17Replacement, SR 0522 over Tributary of
18Middle Creek, Franklin Township,
19Project ID 99143

 

20Project Allocation

401,000

21(Land Allocation - $101,000)

 

22(Design & Contingencies - $300,000)

 

23(59) SR 0035, Highway Portion Bridge
24Replacement, SR 0035 over Tributary of
25Middle Creek, BMS 54-0035-0220-3151,
26Washington Township, Project ID 99120

 

27Project Allocation

321,000

28(Land Allocation - $100,000)

 

29(Design & Contingencies - $221,000)

 

30(60) SR 0522, Resurface, US 522 from Old

 

1US 522 to SR 1009, Segments 0420/0000
2to 0490/0225, Franklin and Middle
3Creek Townships, Project ID 99244

 

4Project Allocation

1,140,000

5(Base Project Allocation - $1,120,000)

 

6(Design & Contingencies - $20,000)

 

7(61) SR 0011, Resurface, SR 0011 from
8Ulsh Road to Penn's Creek, Chapman,
9Franklin and Union Townships, Project
10ID 99241

 

11Project Allocation

1,710,000

12(Base Project Allocation - $1,504,000)

 

13(Design & Contingencies - $206,000)

 

14(62) Various, Highway Portion Bridge
15Preservation, SR 0235 over Middle
16Creek in Spring Township, SR 2004 over
17Tributary of Mahantango Creek in
18Washington Township, SR 2007 over
19Freeburg Run in Washington Township,
20SR 2007 over Kern Run in Beaver
21Township, SR 4012 over Swift Run in
22Spring Township, Beaver, Spring and
23Washington Townships, Project ID 97610

 

24Project Allocation

1,070,000

25(Base Project Allocation - $1,020,000)

 

26(Design & Contingencies - $50,000)

 

27(63) Various, Highway Portion Bridge
28Preservation, Various State Routes,
29Various Municipalities, Project ID
3099131

 

1Project Allocation

380,000

2(Base Project Allocation - $360,000)

 

3(Design & Contingencies - $20,000)

 

4Section 356. Somerset County.

5Projects are as follows:

 

6(1) (Reserved).

 

7(2) SR 4014, Resurface, SR 4014 (Rolling
8Hill Road) from PA 601 to PA 985,
9Jenner Township, Project ID 96347

 

10Project Allocation

550,000

11(Base Project Allocation - $550,000)

 

12(3) SR 0281, Safety Improvement, on PA
13281 from Groff Road (SR 3003) to PA
14653, Lower Turkeyfoot, Middlecreek and
15Upper Turkeyfoot Townships, Ursina
16Borough, Project ID 93144

 

17Project Allocation

8,000,000

18(Base Project Allocation - $8,000,000)

 

19(4) SR 0056, Resurface, PA 56 from the
20Cambria County Line to Graham Avenue
21(SR 1033), Paint Borough, Paint
22Township, Windber Borough, Project ID
2392616

 

24Project Allocation

350,000

25(Base Project Allocation - $350,000)

 

26(5) SR 1011, Resurface, Village Road (SR
271011) from Piesol Road (T-523) to
28Listie Road (SR 1003), Somerset
29Township, Project ID 96624

 

30Project Allocation

800,000

1(Base Project Allocation - $800,000)

 

2(6) SR 0653, Resurface, PA 281 (Kingwood
3Road) in New Centerville Borough to SR
43015 (Main Street), Milford Township,
5New Centerville and Rockwood Boroughs,
6Project ID 69768

 

7Project Allocation

680,000

8(Base Project Allocation - $481,000)

 

9(Land Allocation - $90,000)

 

10(Design & Contingencies - $109,000)

 

11(7) SR 4035, Resurface, Woodstown Highway
12(SR 4035) from PA 601 to PA 403,
13Conemaugh and Jenner Townships,
14Project ID 96653

 

15Project Allocation

1,600,000

16(Base Project Allocation - $1,600,000)

 

17(8) SR 0219, Highway Reconstruction, US
18219 from Two Lane Section to US 30
19Interchange, Somerset, Lincoln,
20Quemahoning and Jenner Townships,
21Project ID 92618

 

22Project Allocation

2,550,000

23(Base Project Allocation - $2,550,000)

 

24(9) SR 1023, Resurface, Koontztown Road
25(SR 1023) from PA 403 to Wilbur Road
26(SR 1012), Shade Township, Project ID
2796629

 

28Project Allocation

1,350,000

29(Base Project Allocation - $1,350,000)

 

30(10) SR 2004, Resurface, on Mount Davis

 

1Road (SR 2004) from Platter Hollow
2Road (T-865) to Savage Road (SR 2002),
3Addison and Elk Lick Townships,
4Project ID 96630

 

5Project Allocation

1,000,000

6(Base Project Allocation - $1,000,000)

 

7(11) SR 1015, Resurface, Dividing Ridge
8Road (SR 1015) from Glen Savage Road
9(SR 2019) to PA 31, Allegheny
10Township, Project ID 96625

 

11Project Allocation

1,350,000

12(Base Project Allocation - $1,350,000)

 

13(12) SR 1015, Resurface, Wambaugh Hollow
14Road (SR 1015) from PA 31 to New
15Baltimore Road (SR 1017), Allegheny
16Township, Project ID 96626

 

17Project Allocation

700,000

18(Base Project Allocation - $700,000)

 

19(13) SR 2017, Resurface, Brush Creek Road
20(SR 2017) from Glencoe Road (SR 2020)
21to Leister Road (SR 2022), Northampton
22Township, Project ID 96634

 

23Project Allocation

1,600,000

24(Base Project Allocation - $1,600,000)

 

25(14) SR 2033, Resurface, Diamond Street
26(SR 2033) from Main Street (SR 2030)
27to Shady Lane (T-700), Berlin Borough,
28Brothers Valley Township, Project ID
2996637

 

30Project Allocation

250,000

1(Base Project Allocation - $250,000)

 

2(15) SR 2026, Resurface, Berkleys Mill
3Road (SR 2026) from Pine Hill Road (SR
42027) to Maple Valley Road (SR 2025),
5Summit Township, Project ID 96636

 

6Project Allocation

500,000

7(Base Project Allocation - $500,000)

 

8(16) SR 2004, Resurface, Mount Davis Road
9(SR 2004) from Savage Road (SR 2002 to
10Rockdale Road (SR 2016), Elk Lick and
11Summit Townships, Project ID 96631

 

12Project Allocation

3,500,000

13(Base Project Allocation - $3,500,000)

 

14(17) SR 0281, Resurface, on PA 281 from
15Handwerk Road to Ling Road (T-426),
16Middlecreek and Milford Townships, New
17Centerville Borough, Upper Turkeyfoot
18Township, Project ID 90237

 

19Project Allocation

611,000

20(Base Project Allocation - $600,000)

 

21(Land Allocation - $11,000)

 

22(18) SR 0031, Culvert Replacement, PA 31
23over Tributary of Stonycreek near the
24Intersection of PA 160, Brothers
25Valley and Stonycreek Townships,
26Project ID 92703

 

27Project Allocation

90,000

28(Base Project Allocation - $90,000)

 

29(19) SR 2011, Resurface, McKenzie Hollow
30Road (SR 2011) from Greenville Road

 

1(SR 2010) to PA 160, Greenville and
2Larimer Townships, Project ID 96632

 

3Project Allocation

1,350,000

4(Base Project Allocation - $1,350,000)

 

5(20) SR 2017, Resurface, Brush Creek Road
6(SR 2017) from Leister Road (SR 2022)
7to Miller Road (T-469), Allegheny and
8Northampton Township, Project ID 96635

 

9Project Allocation

700,000

10(Base Project Allocation - $700,000)

 

11(21) SR 1016, Resurface, McGregor Avenue
12(SR 1016) from School Road (SR 1021)
13to PA 160, Shade Township, Project ID
1496627

 

15Project Allocation

175,000

16(Base Project Allocation - $175,000)

 

17(22) SR 2015, Resurface, Glencoe Road (SR
182015) from PA 160 to Carter Hill Road
19(T-754), Northampton and Southampton
20Townships, Project ID 96633

 

21Project Allocation

2,100,000

22(Base Project Allocation - $2,100,000)

 

23(23) SR 2033, Resurface, Beulah Road (SR
242033) from Shady Lane (T-700) to PA
2531, Brothers Valley Township, Project
26ID 96638

 

27Project Allocation

900,000

28(Base Project Allocation - $900,000)

 

29(24) SR 0669, Resurface, PA 669 from the
30Maryland State Line to US 219, Elk

 

1Lick Township, Salisbury Borough,
2Project ID 96614

 

3Project Allocation

1,893,000

4(Base Project Allocation - $1,893,000)

 

5(25) SR 3002, Resurface, SR 3002 from
6Braddocks Run Road (T-858) to SR 3043,
7Addison Township, Project ID 96641

 

8Project Allocation

1,000,000

9(Base Project Allocation - $1,000,000)

 

10(26) SR 4029, Resurface, North Fork Dam
11Road (SR 4029) from Roaring Run Road
12(SR 4027) to Saylor School Road (SR
134031), Conemaugh and Jenner Townships,
14Project ID 96652

 

15Project Allocation

725,000

16(Base Project Allocation - $725,000)

 

17(27) SR 0281, Resurface, PA 281 from
18Beggs Street to Humbert Road (SR
193007), Confluence Borough, Lower
20Turkeyfoot Township, Ursina Borough,
21Project ID 96602

 

22Project Allocation

650,000

23(Base Project Allocation - $650,000)

 

24(28) SR 2004, Resurface, SR 2004 (Mount
25Davis Road) from PA 523 to Platter
26Hollow Road, Addison Township, Project
27ID 96346

 

28Project Allocation

1,100,000

29(Base Project Allocation - $1,100,000)

 

30(29) SR 0281, Resurface, on PA 281 from

 

1the Village of Geiger to Leland Street
2(T-729), Somerset Township, Project ID
396605

 

4Project Allocation

2,051,000

5(Base Project Allocation - $2,001,000)

 

6(Land Allocation - $50,000)

 

7(30) SR 0985, Resurface, on PA 985 from
8Roaring Run Road (SR 4027) to Saylor
9School Road (SR 4031), Conemaugh and
10Jenner Townships, Jennerstown Borough,
11Project ID 91668

 

12Project Allocation

300,000

13(Base Project Allocation - $300,000)

 

14(31) SR 2033, Resurface, Willkow Road (SR
152033) from Brotherton Road (SR 1005)
16to Coleman Station Road (SR 1003),
17Stonycreek Township, Project ID 96639

 

18Project Allocation

500,000

19(Base Project Allocation - $500,000)

 

20(32) SR 0985, Resurface, on PA 985 from
21PA 601 to Acosta Road (SR 4006),
22Jenner and Lincoln Townships, Project
23ID 96615

 

24Project Allocation

1,100,000

25(Base Project Allocation - $1,100,000)

 

26(33) SR 1021, Resurface, School Road (SR
271021) from Yania Road (T-787) to PA
28160, Shade Township, Project ID 96628

 

29Project Allocation

750,000

30(Base Project Allocation - $750,000)

 

1(34) SR 0219, Resurface, on US 219 from
2Meyersdale Bypass to Old Mill Road (T-
3618), Brothers Valley Township,
4Garrett Borough, Summit Township,
5Project ID 96601

 

6Project Allocation

3,800,000

7(Base Project Allocation - $3,800,000)

 

8(35) SR 0219, Resurface, on US 219 from
9Brotherton Road (SR 1003) to Craig
10Road (T-732), Brothers Valley and
11Somerset Townships, Project ID 91671

 

12Project Allocation

3,800,000

13(Base Project Allocation - $3,800,000)

 

14(36) SR 3002, Resurface, SR 3002 from SR
153043 to US 40, Addison Borough,
16Addison Township, Project ID 96642

 

17Project Allocation

600,000

18(Base Project Allocation - $600,000)

 

19(37) SR 0031, Resurface, on PA 31 from
20Orchard Avenue to SR 1003
21(Brotherton/Coleman Station Road),
22Brothers Valley Township, Somerset
23Borough, Somerset and Stonycreek
24Townships, Project ID 91672

 

25Project Allocation

2,100,000

26(Base Project Allocation - $2,100,000)

 

27(38) SR 0653, Resurface, PA 653 from Main
28Street (SR 3006) to Pinet Run Bridge,
29Black Township, Rockwood Borough,
30Summit Township, Project ID 96613

 

1Project Allocation

2,300,000

2(Base Project Allocation - $2,300,000)

 

3(39) SR 0653, Resurface, PA 653 from PA
4281 to Main Street (SR 3006), Milford
5Township, New Centerville and Rockwood
6Boroughs, Project ID 96611

 

7Project Allocation

800,000

8(Base Project Allocation - $800,000)

 

9(40) SR 0030, Resurface, US 30 from Old
10Lincoln Highway (T-799) to PA 160,
11Quemahoning, Shade and Stonycreek
12Townships, Project ID 96598

 

13Project Allocation

700,000

14(Base Project Allocation - $700,000)

 

15(41) SR 0653, Resurface, PA 653 from
16Fayette County Line to PA 281,
17Middlecreek and Upper Turkeyfoot
18Townships, Project ID 96610

 

19Project Allocation

2,100,000

20(Base Project Allocation - $2,100,000)

 

21(42) SR 0601, Resurface, PA 601 from PA
22985 to SR 4025, Jenner and Lincoln
23Townships, Project ID 96609

 

24Project Allocation

1,700,000

25(Base Project Allocation - $1,700,000)

 

26(43) SR 0403, Resurface, PA 403 from
27Wilbur Road (SR 1012) to the Cambria
28County Line, Benson Borough, Conemaugh
29Township, Hooversville Borough, Paint,
30Quemahoning and Shade Townships,

 

1Project ID 96607

 

2Project Allocation

4,200,000

3(Base Project Allocation - $4,200,000)

 

4(44) SR 0030, Resurface, on US 30 from PA
5160 to Bedford County Line, Allegheny,
6Shade and Stonycreek Townships,
7Project ID 96599

 

8Project Allocation

1,300,000

9(Base Project Allocation - $1,300,000)

 

10(45) SR 0056, Resurface, PA 56 from Verla
11Drive (SR 1033) to Bedford County
12Line, Ogle and Paint Townships,
13Project ID 96600

 

14Project Allocation

2,000,000

15(Base Project Allocation - $2,000,000)

 

16(46) SR 0281, Resurface, on PA 281
17(Stoystown Road) from Welsh Hill Road
18(SR 1002) to East Main Street (SR
194028), Quemahoning and Somerset
20Townships, Project ID 96606

 

21Project Allocation

2,451,000

22(Base Project Allocation - $2,401,000)

 

23(Land Allocation - $50,000)

 

24(47) SR 0271, Resurface, on PA 271 from
25the Westmoreland County Line to the
26Cambria County Line, Conemaugh
27Township, Project ID 91670

 

28Project Allocation

300,000

29(Base Project Allocation - $300,000)

 

30(48) SR 4005, Resurface, Coxes Creek Road

 

1(SR 4005) from Laurel Run Road (T-860)
2to approximately 0.25 Mile North of
3Bakersville Edie Road (SR 4001),
4Jefferson, Lincoln and Somerset
5Townships, Project ID 96647

 

6Project Allocation

1,200,000

7(Base Project Allocation - $1,200,000)

 

8(49) SR 4021, Resurface, Slagle Hill Road
9(SR 4021) from US 30 to the
10Hooversville Borough Line,
11Hooversville Borough, Quemahoning
12Township, Project ID 96651

 

13Project Allocation

1,300,000

14(Base Project Allocation - $1,300,000)

 

15(50) SR 0281, Resurface, PA 281 from
16Gilmore Access Road (SR 4055) to the
17Village of Geiger, Somerset Borough,
18Somerset Township, Project ID 96604

 

19Project Allocation

750,000

20(Base Project Allocation - $750,000)

 

21(51) SR 0985, Resurface, PA 985 from
22Saylor School Road (SR 4031) to the
23Cambria County Line, Conemaugh
24Township, Project ID 91669

 

25Project Allocation

1,522,000

26(Base Project Allocation - $1,522,000)

 

27(52) SR 0040, Resurface, on US 40 from
28the Maryland State Line to the Fayette
29County Line, Addison Borough, Addison
30Township, Project ID 92711

 

1Project Allocation

3,000,000

2(Base Project Allocation - $3,000,000)

 

3(53) SR 3003, Highway Restoration, PA
43003 from Fifth Avenue to SR 0281,
5Confluence Borough, Project ID 92712

 

6Project Allocation

100,000

7(Base Project Allocation - $100,000)

 

8(54) SR 2037, Resurface, SR 2037 from
9Rockdale Road (SR 2016) to PA 653,
10Garrett Borough, Summit Township,
11Project ID 96640

 

12Project Allocation

800,000

13(Base Project Allocation - $800,000)

 

14(55) SR 0271, Intersection Improvements,
15US 30 at the Ralphtroad (SR 4025)
16Intersection, Jenner Township, Project
17ID 88239

 

18Project Allocation

200,000

19(Base Project Allocation - $200,000)

 

20(56) SR 4017, Resurface, Beaver Dam Road
21(SR 4017) from PA 281 to US 30,
22Quemahoning and Somerset Townships,
23Project ID 96650

 

24Project Allocation

2,100,000

25(Base Project Allocation - $2,100,000)

 

26(57) SR 4011, Resurface, Stouffer Hill
27Road (SR 4011) from Listie Road (SR
281003) to PA 281, Somerset Township,
29Project ID 96649

 

30Project Allocation

325,000

1(Base Project Allocation - $325,000)

 

2(58) SR 0281, Resurface, on PA 281 from
3Humbert Road (SR 3007) to Handwork
4Road (T-352), Upper Turkeyfoot
5Township, Project ID 96603

 

6Project Allocation

850,000

7(Base Project Allocation - $800,000)

 

8(Land Allocation - $50,000)

 

9(59) SR 0985, Resurface, on PA 985 from
10Acosta Road (SR 4006) to US 30, Jenner
11Township, Jennerstown Borough, Project
12ID 96616

 

13Project Allocation

900,000

14(Base Project Allocation - $900,000)

 

15(60) SR 4009, Resurface, Edgewood Avenue
16(SR 4009) from SR 3015 to Byers Road
17(T-482), Somerset Borough, Somerset
18Township, Project ID 96648

 

19Project Allocation

750,000

20(Base Project Allocation - $750,000)

 

21(61) SR 1001, Resurface, Stutzmantown
22Road (SR 1001) from PA 31 to Welsh
23Hill Road (SR 1002), Somerset and
24Stonycreek Townships, Project ID 96617

 

25Project Allocation

1,550,000

26(Base Project Allocation - $1,550,000)

 

27(62) SR 1005, Resurface, Brotherton Road
28(SR 1005) from PA 31 to SR 1007,
29Shanksville Borough, Stonycreek
30Township, Project ID 96622

 

1Project Allocation

1,200,000

2(Base Project Allocation - $1,200,000)

 

3(63) SR 1003, Resurface, on Brotherton
4Road (SR 1003) from Welsh Hill Road
5(SR 1002) to PA 281, Somerset and
6Stonycreek Townships, Project ID 96621

 

7Project Allocation

2,200,000

8(Base Project Allocation - $2,200,000)

 

9(64) SR 3021, Resurface, Walker Road (SR
103021) from PA 653 to SR 3019, Black
11Township, Project ID 96645

 

12Project Allocation

650,000

13(Base Project Allocation - $650,000)

 

14(65) SR 1003, Resurface, on Brotherton
15Road (SR 1003) from Stutzmantown Road
16(SR 1001) to Welsh Hill Road (SR
171002), Stonycreek Township, Project ID
1896620

 

19Project Allocation

350,000

20(Base Project Allocation - $350,000)

 

21(66) SR 1003, Resurface, on Brotherton
22Road (SR 1003 from US 219 to Shaffer
23Road (SR 2033), Brothers Valley and
24Stonycreek Townships, Project ID 96619

 

25Project Allocation

1,750,000

26(Base Project Allocation - $1,750,000)

 

27(67) SR 0031, Construct Center Turn Lane,
28on PA 31 from the Intersection of
29Coxes Creek Road (SR 4005) to Circle
30Drive, Somerset Borough, Somerset

 

1Township, Project ID 88523

 

2Project Allocation

447,000

3(Base Project Allocation - $261,000)

 

4(Land Allocation - $51,000)

 

5(Design & Contingencies - $135,000)

 

6(68) SR 1001, Resurface, John Street (SR
71001) from Welsh Hill Road (SR 1002)
8to North Street (SR 1007), Shanksville
9Borough, Stonycreek Township, Project
10ID 96618

 

11Project Allocation

1,550,000

12(Base Project Allocation - $1,550,000)

 

13(69) SR 3014, Resurface, Covered Bridge
14Road (SR 3014) from PA 653 to Barron
15Church Road (SR 3033), Middlecreek
16Township, Project ID 96644

 

17Project Allocation

600,000

18(Base Project Allocation - $600,000)

 

19(70) SR 3006, Resurface, Leaphart Road
20(SR 3006) from PA 281 to Casselman
21Road (SR 3007), Upper Turkeyfoot
22Township, Project ID 96643

 

23Project Allocation

900,000

24(Base Project Allocation - $900,000)

 

25(71) SR 0281, Highway Reconstruction, PA
26281 from Ling Road T-426 to Valley
27Drive T-549, Milford and Somerset
28Townships, Project ID 91667

 

29Project Allocation

320,000

30(Base Project Allocation - $320,000)

 

1(72) SR 1006, Resurface, North Street (SR
21006) from Bridge Street (SR 1001) to
3PA 160, Shanksville Borough,
4Stonycreek Township, Project ID 96623

 

5Project Allocation

1,300,000

6(Base Project Allocation - $1,300,000)

 

7Section 357. Sullivan County.

8Projects are as follows:

 

9(1) (Reserved).

 

10(2) SR 0220, Resurface, US 220 from the
11Lycoming County Line to Sonestown,
12Davidson Township, Project ID 7030

 

13Project Allocation

2,723,000

14(Base Project Allocation - $2,645,000)

 

15(Land Allocation - $17,000)

 

16(Design & Contingencies - $61,000)

 

17(3) SR 0220, Resurface, US 220 from SR
180087 to Main Street, Segments/Offset
190520/0000 to 0540/0000, Cherry
20Township, Dushore Borough, Project ID
2182985

 

22Project Allocation

361,000

23(Base Project Allocation - $350,000)

 

24(Design & Contingencies - $11,000)

 

25(4) SR 0042, Resurface, PA 42 from the
26Lycoming County Line to US 220,
27Davidson Township, Laporte Borough,
28Laporte Township, Project ID 32766

 

29Project Allocation

2,366,000

30(Base Project Allocation - $2,350,000)

 

1(Design & Contingencies - $16,000)

 

2(5) SR 0220, Resurface, US 220 from Main
3Street to Loyalsock Creek, Laporte
4Borough, Laporte Township, Project ID
568610

 

6Project Allocation

372,000

7(Base Project Allocation - $341,000)

 

8(Design & Contingencies - $31,000)

 

9(6) SR 2003, Highway Portion Bridge
10Rehabilitation, SR 2003 over Painter
11Run, Davidson Township, Project ID
1291432

 

13Project Allocation

1,031,000

14(Base Project Allocation - $1,031,000)

 

15(7) SR 0154, Slide Correction, SR 0154
16North of SR 3009 (World's End Road),
17Segments 0160/0000 to 0160/1000, Forks
18Township, Project ID 96679

 

19Project Allocation

1,826,000

20(Base Project Allocation - $1,500,000)

 

21(Land Allocation - $25,000)

 

22(Design & Contingencies - $301,000)

 

23(8) SR 0087, Resurface, US 220 to
24Hillside Drive (SR 0087),
25Segments/Offset 0530/0000 to
260560/0000, Dushore Borough, Project ID
2782988

 

28Project Allocation

910,000

29(Base Project Allocation - $872,000)

 

30(Design & Contingencies - $38,000)

 

1(9) SR 0487, Highway Resurfacing, PA 487
2from the Luzerne County Line to First
3Forestry Road, Colley and Davidson
4Townships, Project ID 97668

 

5Project Allocation

3,045,000

6(Base Project Allocation - $3,000,000)

 

7(Design & Contingencies - $45,000)

 

8(10) SR 1008, Resurface, SR 1008 from US
9220 to Township Road, Cherry Township,
10Project ID 97786

 

11Project Allocation

193,000

12(Base Project Allocation - $193,000)

 

13(11) SR 0087, Highway Portion Bridge
14Replacement, SR 0087 over Mill Creek,
15Hillsgrove Township, Project ID 89977

 

16Project Allocation

780,000

17(Base Project Allocation - $780,000)

 

18(12) SR 0487, Highway Portion Bridge
19Replacement, SR 0487 over Birch Creek,
20Cherry Township, Project ID 90005

 

21Project Allocation

1,340,000

22(Base Project Allocation - $1,340,000)

 

23(13) SR 0087, Mill and Resurface, SR 0087
24Segments 0420/0274 to 0480/2139,
25Cherry and Forks Townships, Project ID
2687974

 

27Project Allocation

404,000

28(Base Project Allocation - $366,000)

 

29(Design & Contingencies - $38,000)

 

30(14) SR 2002, Highway Portion Bridge

 

1Replacement, SR 2022 over Tributary of
2Muncy Creek, Davidson Township,
3Project ID 97568

 

4Project Allocation

336,000

5(Base Project Allocation - $231,000)

 

6(Land Allocation - $45,000)

 

7(Design & Contingencies - $60,000)

 

8(15) SR 0154, Resurface, PA 154 from
9Wheelerville to the Bradford County
10Line, Fox Township, Project ID 97788

 

11Project Allocation

158,000

12(Base Project Allocation - $158,000)

 

13(16) SR 1002, Highway Portion Bridge
14Replacement, SR 1002 over Pigeon
15Creek, Colley Township, Project ID
1694803

 

17Project Allocation

336,000

18(Base Project Allocation - $231,000)

 

19(Land Allocation - $45,000)

 

20(Design & Contingencies - $60,000)

 

21(17) SR 0087, Resurface, PA 87 from SR
221013 (Dutch Mountain Road) to 0.5 Mile
23East of Kneller Road, Cherry and
24Colley Townships, Project ID 97645

 

25Project Allocation

2,076,000

26(Base Project Allocation - $2,001,000)

 

27(Design & Contingencies - $75,000)

 

28(18) SR 0220, Reconstruct Roadway, US 220
29from Dushore Borough to Shearer Road,
30Segments/Offset 0560/0000 to

 

10570/2419, Cherry Township, Dushore
2Borough, Project ID 93017

 

3Project Allocation

4,360,000

4(Base Project Allocation - $3,350,000)

 

5(Land Allocation - $650,000)

 

6(Design & Contingencies - $360,000)

 

7(19) SR 0487, Resurface, PA 487 from
8Mehoopany Creek To Mattichak Road,
9Colley Township, Project ID 97651

 

10Project Allocation

3,179,000

11(Base Project Allocation - $3,158,000)

 

12(Design & Contingencies - $21,000)

 

13(20) SR 0036, Highway Restoration, SR
140154 from 87 to SR 4001, SR 0154,
15Segments 0200/0000 to 0300/0000,
16Forksville Borough, Elkland Township,
17Project ID 86819

 

18Project Allocation

1,520,000

19(Base Project Allocation - $1,500,000)

 

20(Design & Contingencies - $20,000)

 

21(21) SR 0154, Highway Portion Bridge
22Rehabilitation, SR 0154 over Pole
23Bridge Run, BMS 56-0154-0080-1719,
24Laporte and Shrewsbury Townships,
25Project ID 87924

 

26Project Allocation

757,000

27(Base Project Allocation - $586,000)

 

28(Land Allocation - $17,000)

 

29(Design & Contingencies - $154,000)

 

30(22) SR 0220, Mill and Resurface, SR 0220

 

1from Sonestown to Old SR 0220,
2Segments/Offset 0120/2347 to
30230/0610, Davidson and Laporte
4Townships, Project ID 87948

 

5Project Allocation

551,000

6(Base Project Allocation - $530,000)

 

7(Design & Contingencies - $21,000)

 

8(23) SR 0087, Resurface, PA 87 from
9Kneller Road to Pond Road, Segments
100670/0000 to 0700/0000, Colley
11Township, Project ID 97717

 

12Project Allocation

670,000

13(Base Project Allocation - $650,000)

 

14(Design & Contingencies - $20,000)

 

15(24) SR 0087, Reconstruction, PA 87 from
16Wampole Run Road to US 220, Cherry
17Township, Dushore Borough, Project ID
1899166

 

19Project Allocation

4,100,000

20(Base Project Allocation - $4,100,000)

 

21(25) SR 4002, Highway Portion Bridge
22Replacement, SR 4002 over Tributary of
23Hoagland Branch, Fox Township, Project
24ID 99362

 

25Project Allocation

230,000

26(Base Project Allocation - $230,000)

 

27(26) SR 0154, Resurface, SR 0154 from US
28220 to Shanerburg Road, Laporte
29Township, Project ID 101276

 

30Project Allocation

1,956,000

1(Base Project Allocation - $1,956,000)

 

2(27) SR 0154, Resurface, SR 0154 from SR
33009 (Double Run Road) to PA 87,
4Segments 0150/1590 to 0194/1321, Forks
5Township, Forksville Borough, Project
6ID 99381

 

7Project Allocation

920,000

8(Base Project Allocation - $900,000)

 

9(Design & Contingencies - $20,000)

 

10(28) SR 0087, Resurface, SR 0087 Lambert
11Hill Road to Little Loyalsock Creek,
12Segments 0370/0000 to 0420/0154, Forks
13Township, Project ID 99376

 

14Project Allocation

907,000

15(Base Project Allocation - $886,000)

 

16(Design & Contingencies - $21,000)

 

17(29) SR 0087, Resurface, PA 87 from the
18Lycoming County Line to Loyalsock
19Creek, Hillsgrove Township, Project ID
2099159

 

21Project Allocation

2,094,000

22(Base Project Allocation - $2,094,000)

 

23(30) SR 0487, Resurface, SR 0487 from
24Connells Dam Road to PA 87, Segments
250360/0000 to 0390/3006, Cherry
26Township, Dushore Borough, Project ID
2799384

 

28Project Allocation

817,000

29(Base Project Allocation - $796,000)

 

30(Design & Contingencies - $21,000)

 

1(31) SR 0087, Resurface, SR 0087 from
2Hillside Drive to Dutch Mountain Road,
3Segments 0560/0000 to 0600/1864,
4Cherry Township, Project ID 99380

 

5Project Allocation

1,597,000

6(Base Project Allocation - $1,576,000)

 

7(Design & Contingencies - $21,000)

 

8(32) SR 0220, Resurface Roadway, SR 0220
9from Maple Leaf to the Bradford County
10Line, Cherry Township, Project ID
1199117

 

12Project Allocation

116,000

13(Base Project Allocation - $71,000)

 

14(Design & Contingencies - $45,000)

 

15(33) SR 4024, Resurface, SR 4024 from
16Tourscher Road to US 220, Segments
170030/0000 to 0090/2426, Cherry
18Township, Project ID 99392

 

19Project Allocation

665,000

20(Base Project Allocation - $645,000)

 

21(Design & Contingencies - $20,000)

 

22(34) SR 0154, Resurface, SR 0154 from
23Shanerburg Road to SR 3009, Segments
240080/0000 to 0150/1564, Forks, Laporte
25and Shrewsbury Townships, Project ID
2699382

 

27Project Allocation

1,456,000

28(Base Project Allocation - $1,435,000)

 

29(Design & Contingencies - $21,000)

 

30(35) SR 0154, Highway Portion Bridge

 

1Rehabilitation, PA 154 over Elk Creek,
2Elkland Township, Project ID 99087

 

3Project Allocation

600,000

4(Base Project Allocation - $600,000)

 

5(36) SR 0487, Resurface Roadway, SR 0487
6from Mattichak Road to Main Street,
7Colley Township, Project ID 99119

 

8Project Allocation

35,000

9(Base Project Allocation - $9,000)

 

10(Design & Contingencies - $26,000)

 

11(37) SR 0087, Resurface Roadway, SR 0087
12from Loyalsock Creek to Splash Dam
13Road, Hillsgrove Township, Project ID
1499110

 

15Project Allocation

67,000

16(Base Project Allocation - $37,000)

 

17(Design & Contingencies - $30,000)

 

18(38) SR 0042, Reconstruction, PA 42 from
19US 220 to 0.5 Mile North of Muncy
20Valley Road, Davidson and Shrewsbury
21Townships, Project ID 99422

 

22Project Allocation

2,325,000

23(Base Project Allocation - $2,325,000)

 

24(39) SR 0154, Resurface Roadway, SR 0154
25from Cotts Road to Piatt, Elkland and
26Fox Townships, Project ID 99111

 

27Project Allocation

79,000

28(Base Project Allocation - $48,000)

 

29(Design & Contingencies - $31,000)

 

30(40) SR 0220, Resurface, US 220 from Old

 

1Route 220 to 0.25 Mile South of PA 42,
2Laporte Borough, Laporte Township,
3Project ID 99423

 

4Project Allocation

2,300,000

5(Base Project Allocation - $2,300,000)

 

6(41) SR 0087, Resurface Roadway, SR 0087
7from Splash Dam Road to Scar Run,
8Forks and Hillsgrove Townships,
9Project ID 99108

 

10Project Allocation

71,000

11(Base Project Allocation - $41,000)

 

12(Design & Contingencies - $30,000)

 

13(42) SR 4006, Highway Portion Bridge
14Replacement, SR 4006 over Tributary of
15Hoagland Branch, Fox Township, Project
16ID 99363

 

17Project Allocation

336,000

18(Base Project Allocation - $231,000)

 

19(Land Allocation - $45,000)

 

20(Design & Contingencies - $60,000)

 

21(43) SR 0220, Highway Portion Bridge
22Replacement, US 220 over Tributary of
23Little Loyalsock Creek, Cherry
24Township, Project ID 99105

 

25Project Allocation

1,527,000

26(Base Project Allocation - $1,401,000)

 

27(Land Allocation - $46,000)

 

28(Design & Contingencies - $80,000)

 

29(44) SR 0220, Highway Portion Bridge
30Replacement, PA 220 over Marsh Creek,

 

1Dushore Borough, Project ID 99275

 

2Project Allocation

1,750,000

3(Base Project Allocation - $1,750,000)

 

4(45) SR 0087, Resurface Roadway, SR 0087
5from Scar Run to Loyalsock Creek,
6Forks Township, Forksville Borough,
7Project ID 99103

 

8Project Allocation

68,000

9(Base Project Allocation - $38,000)

 

10(Design & Contingencies - $30,000)

 

11(46) SR 0220, Highway Portion Bridge
12Replacement, US 220 over Mill Creek,
13Laporte Township, Project ID 99102

 

14Project Allocation

1,400,000

15(Base Project Allocation - $1,400,000)

 

16(47) SR 2006, Resurface Roadway, SR 2006
17From Tilley Road to SR 2003, Laporte
18Township, Project ID 99125

 

19Project Allocation

181,000

20(Base Project Allocation - $155,000)

 

21(Design & Contingencies - $26,000)

 

22(48) SR 4002, Highway Portion Bridge
23Replacement, SR 4002 over Fall Run,
24Fox Township, Project ID 98536

 

25Project Allocation

1,064,000

26(Base Project Allocation - $940,000)

 

27(Land Allocation - $64,000)

 

28(Design & Contingencies - $60,000)

 

29(49) SR 1002, Resurface Roadway, SR 1002
30from SR 1013 to Black Line Road,

 

1Cherry Township, Project ID 99124

 

2Project Allocation

324,000

3(Base Project Allocation - $298,000)

 

4(Design & Contingencies - $26,000)

 

5(50) SR 0042, Resurface, SR 0042 from
6Spring Street to US 220, Laporte
7Borough, Project ID 99220

 

8Project Allocation

50,000

9(Base Project Allocation - $4,000)

 

10(Design & Contingencies - $46,000)

 

11(51) SR 0220, Resurface Roadway, SR 0220
12from SR 0087 to Marsh Creek, Dushore
13Borough, Project ID 99114

 

14Project Allocation

125,000

15(Base Project Allocation - $110,000)

 

16(Design & Contingencies - $15,000)

 

17(52) SR 3009, Resurface Roadway, SR 3009
18from High Knob Road to SR 0154, Forks
19and Shrewsbury Townships, Project ID
2099126

 

21Project Allocation

82,000

22(Base Project Allocation - $51,000)

 

23(Design & Contingencies - $31,000)

 

24(53) SR 0220, Highway Portion Bridge
25Replacement, US 220 over Mosey Run,
26Davidson Township, Project ID 99100

 

27Project Allocation

1,500,000

28(Base Project Allocation - $1,500,000)

 

29(54) SR 4001, Resurface, SR 4001 from
30Tributary of Elk Run to PA 154,

 

1Elkland Township, Project ID 102009

 

2Project Allocation

190,000

3(Base Project Allocation - $190,000)

 

4(55) SR 3011, Highway Portion Bridge
5Replacement, SR 3011 over Outlet For
6Eagles Mere Lake, Eagles Mere Borough,
7Project ID 99361

 

8Project Allocation

230,000

9(Base Project Allocation - $230,000)

 

10(56) SR 0042, Resurface, PA 42 from
11Lakewood Avenue to Spring Street,
12Eagles Mere and Laporte Boroughs,
13Laporte and Shrewsbury Townships,
14Project ID 99447

 

15Project Allocation

4,370,000

16(Base Project Allocation - $4,370,000)

 

17(57) Various, Highway Portion Bridge
18Painting, Various State Routes,
19Various Municipalities, Project ID
2097647

 

21Project Allocation

1,212,000

22(Base Project Allocation - $1,201,000)

 

23(Design & Contingencies - $11,000)

 

24Section 358. Susquehanna County.

25Projects are as follows:

 

26(1) (Reserved).

 

27(2) SR 0492, Slope Repairs, SR 0492
28(Jackson Street), New Milford
29Township, Project ID 96809

 

30Project Allocation

449,000

1(Base Project Allocation - $265,000)

 

2(Design & Contingencies - $184,000)

 

3(3) SR 0171, Slope Repair, SR 0171 (State
4Street), Oakland Borough, Project ID
596811

 

6Project Allocation

892,000

7(Base Project Allocation - $662,000)

 

8(Design & Contingencies - $230,000)

 

9(4) SR 0706, Highway Surface Treatment,
10Various Locations, Bridgewater and
11Jessup Townships, Montrose Borough,
12New Milford and Rush Townships,
13Project ID 91222

 

14Project Allocation

5,857,000

15(Base Project Allocation - $5,856,000)

 

16(Design & Contingencies - $1,000)

 

17(5) SR 0106, Highway Portion Bridge
18Replacement, SR 0106 over Tunkhannock
19Creek, Lenox Township, Project ID
2089023

 

21Project Allocation

810,000

22(Base Project Allocation - $650,000)

 

23(Land Allocation - $26,000)

 

24(Design & Contingencies - $134,000)

 

25(6) SR 0029, SR 0092, Restoration,
26Surface Treatment, SR 0092 from the
27Luzerne County Line to SR 1017, SR
280029 from T-761 to the New York State
29Line, Franklin, Gibson, Lenox and
30Liberty Townships, Project ID 91221

 

1Project Allocation

3,838,000

2(Base Project Allocation - $3,838,000)

 

3(7) SR 0092, Slope Repair, SR 0092
4(Franklin Avenue), Oakland Township,
5Susquehanna Depot Borough, Project ID
696812

 

7Project Allocation

1,749,000

8(Base Project Allocation - $1,289,000)

 

9(Design & Contingencies - $460,000)

 

10(8) SR 0081, Restoration, I-81 Northbound
11and Southbound from Exit 223 to North
12of SR 0541, Harford and New Milford
13Townships, Project ID 85772

 

14Project Allocation

17,808,000

15(Base Project Allocation -
16$17,008,000)

 

17(Design & Contingencies - $800,000)

 

18(9) SR 0011, Highway Portion Bridge
19Replacement, SR 0011 (Lackawanna
20Trail) over Salt Lick Creek, New
21Milford Township, Project ID 96737

 

22Project Allocation

1,021,000

23(Base Project Allocation - $864,000)

 

24(Land Allocation - $20,000)

 

25(Design & Contingencies - $137,000)

 

26(10) SR 0081, Restoration, I-81
27Northbound and Southbound from North
28of SR 0541 to South of SR 0106,
29Harford and Lenox Townships, Project
30ID 87796

 

1Project Allocation

8,000,000

2(Base Project Allocation - $7,500,000)

 

3(Design & Contingencies - $500,000)

 

4(11) SR 0081, Rehabilitation, 0081/2054
5through 0081/2105, Lenox Township,
6Project ID 87798

 

7Project Allocation

79,000,000

8(Base Project Allocation -
9$79,000,000)

 

10(12) SR 0081, Restoration, SR 0081 in
11Lenox Township, 0.6 Mile North TR 374,
12Lenox Township, Project ID 87798

 

13Project Allocation

7,900,000

14(Base Project Allocation - $6,700,000)

 

15(Design & Contingencies - $1,200,000)

 

16(13) SR 0029, Roadway Slide Repair,
17Guiderail, Drainage, SR 0029, Franklin
18Township, Project ID 88584

 

19Project Allocation

362,000

20(Base Project Allocation - $320,000)

 

21(Land Allocation - $10,000)

 

22(Design & Contingencies - $32,000)

 

23(14) SR 0706, Highway Reconstruction,
24Improve Roadway Geometry, Drainage and
25Guiderail, SR 0706 from the Village of
26Rush to the Village of Fairdale,
27Jessup and Rush Townships, Project ID
2847123

 

29Project Allocation

3,183,000

30(Base Project Allocation - $3,120,000)

 

1(Land Allocation - $3,000)

 

2(Design & Contingencies - $60,000)

 

3(15) SR 0029, Restoration, SR 0029,
4Liberty Township, Project ID 94630

 

5Project Allocation

1,120,000

6(Base Project Allocation - $1,008,000)

 

7(Land Allocation - $16,000)

 

8(Design & Contingencies - $96,000)

 

9(16) SR 0011, Shoulder Widening and
10Edgeline Rumble Strips, SR 0011 from
11TR 406 (Squier Cemetery Road) to SR
120106 (Main Street), Harford, Lathrop
13and Lenox Townships, Project ID 94741

 

14Project Allocation

451,000

15(Base Project Allocation - $173,000)

 

16(Land Allocation - $247,000)

 

17(Design & Contingencies - $31,000)

 

18(17) SR 0011, Shoulder Widening and
19Edgeline Rumble Strips, SR 0011 from
20Wyoming County Line to 1 Mile SR 2017
21(South of Station Hill Road), Lathrop
22Township, Project ID 94737

 

23Project Allocation

436,000

24(Base Project Allocation - $173,00)

 

25(Land Allocation - $232,000)

 

26(Design & Contingencies - $31,000)

 

27(18) SR 0171, Intersection Improvements,
28Curb, Sidewalk and Barrier Upgrades,
29PA 171 at SR 1009, Lanesboro Borough,
30Project ID 47034

 

1Project Allocation

434,000

2(Base Project Allocation - $336,000)

 

3(Land Allocation - $28,000)

 

4(Design & Contingencies - $70,000)

 

5(19) SR 0011, Shoulder Widening and
6Edgeline Rumble Strips, SR 0011 from 1
7Mile South of SR 2017 (Station Hill
8Road) to TR 406 (Squier Cemetery
9Road), Hop Bottom Borough and Lathrop
10Township, Project ID 94740

 

11Project Allocation

440,000

12(Base Project Allocation - $173,000)

 

13(Land Allocation - $220,000)

 

14(Design & Contingencies - $47,000)

 

15(20) SR 1033, Highway Reconstruction with
16Bridge Replacement, SR 1033 over
17Dubois Creek, Great Bend Township,
18Hallstead Borough, Project ID 83062

 

19Project Allocation

430,000

20(Base Project Allocation - $358,000)

 

21(Design & Contingencies - $72,000)

 

22(21) SR 0374, Highway Portion Bridge
23Replacement, PA 374 over North Branch
24of Tunkannock Creek, Lenox Township,
25Project ID 93935

 

26Project Allocation

723,000

27(Base Project Allocation - $588,000)

 

28(Design & Contingencies - $135,000)

 

29(22) SR 1010, Slope Repair, SR 1010
30(Harmony Road), Oakland Township,

 

1Project ID 96816

 

2Project Allocation

268,000

3(Base Project Allocation - $199,000)

 

4(Design & Contingencies - $69,000)

 

5(23) SR 1022, Slope Repair, SR 1022
6(Liberty Park Road), Liberty Township,
7Project ID 96815

 

8Project Allocation

535,000

9(Base Project Allocation - $397,000)

 

10(Design & Contingencies - $138,000)

 

11(24) SR 0167, Slope Repair, SR 0167
12(Greenwood Street), Brooklyn Township,
13Project ID 96814

 

14Project Allocation

535,000

15(Base Project Allocation - $397,000)

 

16(Design & Contingencies - $138,000)

 

17(25) SR 1021, Slope Repair, SR 1021
18(Brushville Road), Oakland Township,
19Project ID 96813

 

20Project Allocation

179,000

21(Base Project Allocation - $133,000)

 

22(Design & Contingencies - $46,000)

 

23(26) SR 0171, SR 4002, Restoration,
24Surface Treatment, SR 0171 and SR 4002
25in the Corresponding Municipalities,
26Ararat and Clifford Townships, Forest
27City Borough, Herrick and Silver Lake
28Townships, Union Dale Borough, Project
29ID 101932

 

30Project Allocation

6,371,000

1(Base Project Allocation - $6,371,000)

 

2(27) SR 0374, Highway Portion Bridge
3Replacement over North Branch of
4Tunkannock Creek, SR 0374, Lenox
5Township, Project ID 101010

 

6Project Allocation

3,715,000

7(Base Project Allocation - $3,024,000)

 

8(Design & Contingencies - $691,000)

 

9(28) I-81, Resurface, from Lackawanna
10County Line to Exit 223, Harford,
11Lenox and New Milford Townships, New
12Milford Borough, Project ID 98246

 

13Project Allocation

2,100,000

14(Base Project Allocation - $2,100,000)

 

15(29) SR 0171, Highway Portion Bridge
16Replacement, SR 0171, Great Bend
17Township, Project ID 101043

 

18Project Allocation

918,000

19(Base Project Allocation - $228,000)

 

20(Design & Contingencies - $690,000)

 

21(30) SR 0267, Restoration, Surface
22Treatment, SR 0267 from the Wyoming
23County Line to Lane Road, Auburn,
24Forest Lake and Rush Townships,
25Project ID 102008

 

26Project Allocation

5,968,000

27(Base Project Allocation - $5,967,000)

 

28(Design & Contingencies - $1)

 

29(31) SR 0092, Surface Treatment, Various
30Segments of SR 0092 and SR 0267,

 

1Various Municipalities in Susquehanna
2and Wyoming Counties, Project ID 99521

 

3Project Allocation

5,464,000

4(Base Project Allocation - $5,463,000)

 

5(Design & Contingencies - $1,000)

 

6(32) I-81, Reconstruction, I-81 from the
7Lackawanna County Line to the New York
8State Line, Various Municipalities,
9Project ID 0

 

10Project Allocation

109,000,000

11(Base Project Allocation -
12$109,000,000)

 

13(33) SR 0029, Highway Portion Bridge
14Replacement, SR 0029, Franklin
15Township, Project ID 101054

 

16Project Allocation

1,001,000

17(Base Project Allocation - $311,000)

 

18(Design & Contingencies - $690,000)

 

19(34) SR 0029, Restoration, Surface
20Treatment, SR 0029 from Wyoming County
21Line to SR 3013 and SR 0029 from SR
223029 to TR 761 (Bailey Road),
23Bridgewater and Franklin Townships,
24Montrose Borough, Springville
25Township, Project ID 102021

 

26Project Allocation

4,501,000

27(Base Project Allocation - $4,500,000)

 

28(Design & Contingencies - $1,000)

 

29(35) SR 0092, Restoration, Surface
30Treatment, SR 0092, SR 0167, SR 1021,

 

1SR 0171 in the Corresponding
2Municipalities, Bridgewater, Brooklyn,
3Gibson, Harmony and Jackson Townships,
4Lanesboro and Oakland Boroughs,
5Oakland Township, Susquehanna Depot
6Borough, Project ID 101994

 

7Project Allocation

5,654,000

8(Base Project Allocation - $5,653,000)

 

9(Design & Contingencies - $1,000)

 

10(36) SR 0092, Resurface, SR 2017 to
11Greenhouse Road, Gibson Township,
12Project ID 102355

 

13Project Allocation

1,112,000

14(Base Project Allocation - $1,112,000)

 

15(37) I-81, Resurface, from the New York
16State Border to Exit 223, Great Bend
17and New Milford Townships, Great Bend
18and New Milford Boroughs, Project ID
1998245

 

20Project Allocation

2,100,000

21(Base Project Allocation - $2,100,000)

 

22Section 359. Tioga County.

23Projects are as follows:

 

24(1) (Reserved).

 

25(2) SR 0006, Highway Portion Bridge
26Replacement, US 6 over Marsh Creek,
27Shippen Township, Project ID 97669

 

28Project Allocation

846,000

29(Base Project Allocation - $600,000)

 

30(Design & Contingencies - $246,000)

 

1(3) SR 1022, Highway Portion Bridge
2Replacement, SR 1022 over Allen Creek,
3Jackson Township, Project ID 97571

 

4Project Allocation

336,000

5(Base Project Allocation - $231,000)

 

6(Land Allocation - $45,000)

 

7(Design & Contingencies - $60,000)

 

8(4) SR 3098, Highway Portion Bridge
9Replacement, SR 3098 over Tributary of
10the East Branch of Stony Fork Creek,
11Delmar Township, Project ID 97573

 

12Project Allocation

336,000

13(Base Project Allocation - $231,000)

 

14(Land Allocation - $45,000)

 

15(Design & Contingencies - $60,000)

 

16(5) SR 0287, Resurface, PA 287 from Cole
17Road to SR 4024, Segments 0610/0970 to
180670/1491, Middlebury and Tioga
19Townships, Project ID 97719

 

20Project Allocation

1,247,000

21(Base Project Allocation - $1,226,000)

 

22(Design & Contingencies - $21,000)

 

23(6) SR 0006, Resurface, US 6 from US 15
24to SR 1001, Segments 0760/1330 to
250780/1097, Mansfield Borough, Project
26ID 97718

 

27Project Allocation

272,000

28(Base Project Allocation - $251,000)

 

29(Design & Contingencies - $21,000)

 

30(7) SR 0015, Mill and Resurface, SR 0015,

 

1Segments 0444/0000 to 0514/0142,
20445/0000 to 0515/0188, Mansfield
3Borough, Richmond Township, Project ID
487971

 

5Project Allocation

458,000

6(Base Project Allocation - $423,000)

 

7(Design & Contingencies - $35,000)

 

8(8) SR 4001, Highway Portion Bridge
9Replacement, SR 4001 over Tributary of
10Wattles Run, Clymer Township, Project
11ID 97574

 

12Project Allocation

336,000

13(Base Project Allocation - $231,000)

 

14(Land Allocation - $45,000)

 

15(Design & Contingencies - $60,000)

 

16(9) SR 0287, Highway Portion Bridge Deck
17Rehabilitation, SR 0287 over Tioga
18River, BMS 58-0287-0730-0745, Tioga
19Borough, Tioga Township, Project ID
207039

 

21Project Allocation

152,000

22(Land Allocation - $15,000)

 

23(Design & Contingencies - $137,000)

 

24(10) SR 0006, Highway Portion Bridge
25Rehabilitation, US 6 over Long Run,
26Gaines Township, Project ID 97673

 

27Project Allocation

572,000

28(Base Project Allocation - $471,000)

 

29(Design & Contingencies - $101,000)

 

30(11) SR 1001, Highway Portion Bridge

 

1Rehabilitation, SR 1001 over Lambs
2Creek, Richmond Township, Project ID
397677

 

4Project Allocation

1,196,000

5(Base Project Allocation - $1,181,000)

 

6(Design & Contingencies - $15,000)

 

7(12) SR 0049, Mill and Resurface, SR
80049, Segments 0080/2742 to 0130/1621,
9Westfield Borough, Westfield Township,
10Project ID 87950

 

11Project Allocation

1,154,000

12(Base Project Allocation - $1,154,000)

 

13(13) SR 0006, Highway Portion Bridge
14Replacement, US 6 over Phoenix Run,
15Gaines Township, Project ID 97674

 

16Project Allocation

1,920,000

17(Base Project Allocation - $1,500,000)

 

18(Design & Contingencies - $420,000)

 

19(14) SR 0015, Resurface Roadway, US 15
20from the Tioga County Line to Connolly
21Lane US 15, Segments 0012/0000 to
220052/3726, US 15 Segments 0013/0000 to
230053/3767, Liberty Township, Project
24ID 87869

 

25Project Allocation

704,000

26(Base Project Allocation - $686,000)

 

27(Design & Contingencies - $18,000)

 

28(15) SR 0414, Roadway Soil Slide Repair,
29SR 0414, Segments/Offset 0080/0000 to
300080/2549, Morris Township, Project ID

 

187879

 

2Project Allocation

500,000

3(Base Project Allocation - $369,000)

 

4(Land Allocation - $41,000)

 

5(Design & Contingencies - $90,000)

 

6(16) SR 4017, Highway Portion Bridge
7Replacement, SR 4017 over Losey Creek,
8Chatham Township, Project ID 97575

 

9Project Allocation

336,000

10(Base Project Allocation - $231,000)

 

11(Land Allocation - $45,000)

 

12(Design & Contingencies - $60,000)

 

13(17) SR 0328, Resurface, PA 328 from PA
14287 to Button Hill Road, Jackson and
15Lawrence Townships, Project ID 97773

 

16Project Allocation

614,000

17(Base Project Allocation - $614,000)

 

18(18) SR 0015, Mill and Resurface Roadway,
19US 15 from Tioga River to SR 2005,
20Segments 0142/0077 to 0272/1075,
210143/0075 to 0273/1148, Bloss
22Township, Blossburg Borough, Liberty
23Township, Project ID 93553

 

24Project Allocation

2,489,000

25(Base Project Allocation - $2,449,000)

 

26(Design & Contingencies - $40,000)

 

27(19) SR 0287, Slide Correction, SR 287
28East of SR 0414, Morris Township,
29Project ID 95646

 

30Project Allocation

215,000

1(Base Project Allocation - $175,000)

 

2(Land Allocation - $20,000)

 

3(Design & Contingencies - $20,000)

 

4(20) SR 4002, Highway Portion Bridge
5Replacement, SR 4002 over Morris
6Brook, Wellsboro Borough, Project ID
797682

 

8Project Allocation

1,851,000

9(Base Project Allocation - $1,651,000)

 

10(Design & Contingencies - $200,000)

 

11(21) SR 2017, Highway Portion Bridge
12Rehabilitation, SR 2017 over Tioga
13River, Blossburg Borough, Project ID
1497680

 

15Project Allocation

871,000

16(Base Project Allocation - $671,000)

 

17(Design & Contingencies - $200,000)

 

18(22) SR 0006, Roadway Safety Improvement,
19US 6 from Wellsboro Borough Limits to
20Cherry Flats Road, Segments/Offset
210540/0975 to 0560/3260, Charleston
22Township, Wellsboro Borough, Project
23ID 88875

 

24Project Allocation

1,074,000

25(Base Project Allocation - $1,074,000)

 

26(23) SR 4007, Highway Portion Bridge
27Rehabilitation, SR 4007 over North
28Brook, Brookfield Township, Project ID
2997684

 

30Project Allocation

726,000

1(Base Project Allocation - $500,000)

 

2(Design & Contingencies - $226,000)

 

3(24) SR 0006, Mill and Resurface Roadway,
4SR 0006 from SR 0287 to Wellsboro
5Borough Limits, Segments/Offset
60500/0000 to 0540/1000 and 0560/0500
7to 0560/2848, Wellsboro Borough,
8Project ID 82984

 

9Project Allocation

137,000

10(Base Project Allocation - $117,000)

 

11(Design & Contingencies - $20,000)

 

12(25) SR 0414, Resurface, PA 0414 from SR
132005 (Water Street) to Blockhouse
14Creek, Liberty Borough, Project ID
1597772

 

16Project Allocation

62,000

17(Base Project Allocation - $46,000)

 

18(Design & Contingencies - $16,000)

 

19(26) SR 4002, Resurface, SR 4002 from
20Fellows Avenue to US 6, Charleston
21Township, Wellsboro Borough, Project
22ID 97750

 

23Project Allocation

721,000

24(Base Project Allocation - $721,000)

 

25(27) SR 4009, Highway Portion Bridge
26Replacement, SR 4009 over Troups
27Creek, 140/458, Brookfield Township,
28Project ID 95548

 

29Project Allocation

531,000

30(Land Allocation - $95,000)

 

1(Design & Contingencies - $436,000)

 

2(28) SR 0015, Roadway Soil Slide Repair,
3US 15 Between Segments 0621/2345
4through 0631/0523, Tioga Township,
5Project ID 93087

 

6Project Allocation

475,000

7(Base Project Allocation - $325,000)

 

8(Design & Contingencies - $150,000)

 

9(29) SR 0014, Resurface, PA 14 from the
10Lycoming County Line to McCracken
11Road, Union Township, Project ID 97778

 

12Project Allocation

848,000

13(Base Project Allocation - $848,000)

 

14(30) SR 1005, Highway Portion Bridge
15Rehabilitation, SR 1005 over Mill
16Creek, Roseville Borough, Project ID
1797678

 

18Project Allocation

926,000

19(Base Project Allocation - $701,000)

 

20(Design & Contingencies - $225,000)

 

21(31) SR 0006, Highway Portion Bridge
22Replacement, US 6 over Tributary of
23North Elk Run, Richmond Township,
24Project ID 99107

 

25Project Allocation

1,400,000

26(Base Project Allocation - $1,400,000)

 

27(32) SR 4012, Resurface, SR 4012 from
28Jemison Creek to SR 0249, Segments
290090/1009 to 0190/2141, Chatham and
30Clymer Townships, Project ID 99399

 

1Project Allocation

771,000

2(Base Project Allocation - $750,000)

 

3(Design & Contingencies - $21,000)

 

4(33) SR 0015, Resurface, US 15 Northbound
5and Southbound from Welcome Center to
6the New York State Line, Tioga and
7Lawrence Townships, Project ID 101335

 

8Project Allocation

4,410,000

9(Base Project Allocation - $4,410,000)

 

10(34) SR 0287, Resurface Roadway, SR 0287
11from Tioga River to SR 0049,
12Lawrenceville Borough, Project ID
1399127

 

14Project Allocation

150,000

15(Base Project Allocation - $124,000)

 

16(Design & Contingencies - $26,000)

 

17(35) SR 1013, Highway Portion Bridge
18Replacement, SR 1013 over Hammond
19Creek, Jackson Township, Project ID
2099365

 

21Project Allocation

317,000

22(Base Project Allocation - $230,000)

 

23(Land Allocation - $46,000)

 

24(Design & Contingencies - $41,000)

 

25(36) SR 3016, Highway Portion Bridge
26Replacement, SR 3016 over a Tributary
27of Zimmerman Creek, Morris Township,
28Project ID 99412

 

29Project Allocation

230,000

30(Base Project Allocation - $230,000)

 

1(37) SR 0014, Highway Portion Bridge
2Replacement, PA 14 over Tributary of
3Lycoming Creek, BMS 58-0014-0140-0000,
4Union Township, Project ID 99113

 

5Project Allocation

1,600,000

6(Base Project Allocation - $1,600,000)

 

7(38) SR 0014, Highway Portion Bridge
8Replacement, PA 14 over Dry Run, BMS
958-0014-0090-0870, Union Township,
10Project ID 99112

 

11Project Allocation

1,500,000

12(Base Project Allocation - $1,500,000)

 

13(39) SR 4007, Resurface, SR 4007 from SR
140049 to Bertch Road, Segments
150010/0000 to 0100/3105, Brookfield and
16Westfield Townships, Project ID 99395

 

17Project Allocation

1,020,000

18(Base Project Allocation - $1,000,000)

 

19(Design & Contingencies - $20,000)

 

20(40) SR 3023, Highway Portion Bridge
21Replacement, SR 3023 over Heise Run,
22Delmar Township, Project ID 99413

 

23Project Allocation

230,000

24(Base Project Allocation - $230,000)

 

25(41) SR 0287, Highway Portion Bridge
26Replacement, PA 287 over Tributary of
27the Tioga River, BMS 58-0287-0810-
280000, Lawrence Township, Project ID
2999132

 

30Project Allocation

1,400,000

1(Base Project Allocation - $1,400,000)

 

2(42) SR 0287, Highway Portion Bridge
3Rehabilitation, PA 287 over Mutton
4Lane Creek, BMS 58-0287-0810-0633,
5Lawrence Township, Project ID 99133

 

6Project Allocation

1,100,000

7(Base Project Allocation - $1,100,000)

 

8(43) SR 2016, Highway Portion Bridge
9Replacement, SR 2016 over Bellman Run,
10Hamilton Township, Project ID 98539

 

11Project Allocation

1,380,000

12(Base Project Allocation - $1,300,000)

 

13(Land Allocation - $25,000)

 

14(Design & Contingencies - $55,000)

 

15(44) SR 3023, Highway Portion Bridge
16Replacement, SR 3023 over Heise Run,
17Delmar Township, Project ID 99414

 

18Project Allocation

230,000

19(Base Project Allocation - $230,000)

 

20(45) SR 0014, Highway Portion Bridge
21Replacement, PA 14 over Tributary of
22Lycoming Creek, BMS 58-0014-0050-0984,
23Union Township, Project ID 99109

 

24Project Allocation

1,600,000

25(Base Project Allocation - $1,600,000)

 

26(46) SR 0287, Resurface Roadway, SR 0287
27from Sand Run to Wilson Creek, Delmar
28Township, Project ID 99128

 

29Project Allocation

173,000

30(Base Project Allocation - $112,000)

 

1(Design & Contingencies - $61,000)

 

2(47) SR 1022, Highway Portion Bridge
3Replacement, SR 1022 over Allen Creek,
4Jackson Township, Project ID 99367

 

5Project Allocation

336,000

6(Base Project Allocation - $231,000)

 

7(Land Allocation - $45,000)

 

8(Design & Contingencies - $60,000)

 

9(48) SR 4001, Highway Portion Bridge
10Replacement, SR 4001 over Potter
11Brook, Clymer Township, Project ID
1299415

 

13Project Allocation

336,000

14(Base Project Allocation - $231,000)

 

15(Land Allocation - $45,000)

 

16(Design & Contingencies - $60,000)

 

17(49) SR 3009, Highway Portion Bridge
18Rehabilitation, SR 3009 over
19Charleston Creek, Charleston Township,
20Project ID 99377

 

21Project Allocation

381,000

22(Base Project Allocation - $331,000)

 

23(Land Allocation - $25,000)

 

24(Design & Contingencies - $25,000)

 

25(50) SR 0006, Resurface, US 6 from Old
26Mills Road to Main Street, Charleston
27Township, Wellsboro Borough, Project
28ID 101052

 

29Project Allocation

3,675,000

30(Base Project Allocation - $3,675,000)

 

1(51) SR 0006, Resurface, SR 0006 from
2Long Run to Colton Road, Segments
30074/0941 to 0200/1558, Gaines and
4Shippen Townships, Project ID 99386

 

5Project Allocation

2,620,000

6(Base Project Allocation - $2,600,000)

 

7(Design & Contingencies - $20,000)

 

8(52) SR 0287, Highway Portion Bridge
9Rehabilitation, PA 287 over Crooked
10Creek, BMS 58-0287-0530-0828,
11Middlebury Township, Project ID 99118

 

12Project Allocation

700,000

13(Base Project Allocation - $700,000)

 

14(53) SR 0249, Highway Portion Bridge
15Rehabilitation, PA 249 over Crooked
16Creek, BMS 58-0249-0172-1570, Chatham
17Township, Project ID 99116

 

18Project Allocation

800,000

19(Base Project Allocation - $800,000)

 

20(54) SR 3007, Highway Portion Bridge
21Replacement, SR 3007 over the West
22Branch of Stoney Fork Creek, Delmar
23Township, Project ID 99370

 

24Project Allocation

230,000

25(Base Project Allocation - $230,000)

 

26(55) SR 1013, Highway Portion Bridge
27Replacement, SR 1013 over Hammond
28Creek, Jackson Township, Project ID
2999366

 

30Project Allocation

336,000

1(Base Project Allocation - $231,000)

 

2(Land Allocation - $45,000)

 

3(Design & Contingencies - $60,000)

 

4(56) SR 2011, Highway Portion Bridge
5Replacement, SR 2011 over Blockhouse
6Creek, Liberty Township, Project ID
799368

 

8Project Allocation

230,000

9(Base Project Allocation - $230,000)

 

10(57) SR 0006, Intersection Improvement,
11US 6, PA 660, and SR 4002, Charleston
12Township, Project ID 101292

 

13Project Allocation

1,850,000

14(Base Project Allocation - $1,850,000)

 

15(58) SR 0006, Resurface, SR 0006 from
16Dantz Run to PA 287, Segments
170300/0000 to 0420/1100, Delmar
18Township, Project ID 99387

 

19Project Allocation

3,695,000

20(Base Project Allocation - $3,675,000)

 

21(Design & Contingencies - $20,000)

 

22(59) SR 0049, Resurface, SR 0049 from
23East Street to Renkin Street, Segments
240280/0000 to 0390/2681, Deerfield and
25Osceola Townships, Project ID 99388

 

26Project Allocation

3,720,000

27(Base Project Allocation - $3,700,000)

 

28(Design & Contingencies - $20,000)

 

29(60) SR 0349, Slide Correction, SR 0349
30Slide, Clymer Township, Project ID

 

1101278

 

2Project Allocation

750,000

3(Base Project Allocation - $750,000)

 

4(61) SR 0287, Resurface, SR 0287 from
5Lake Nessmuk to Pearl Street, Segments
60320/1835 to 0360/0327, Delmar
7Township, Wellsboro Borough, Project
8ID 99389

 

9Project Allocation

1,261,000

10(Base Project Allocation - $1,240,000)

 

11(Design & Contingencies - $21,000)

 

12(62) SR 0049, Highway Portion Bridge
13Rehabilitation, PA 49 over Skinner
14Hollow, BMS 58-0049-0180-2680,
15Westfield Township, Project ID 99115

 

16Project Allocation

800,000

17(Base Project Allocation - $800,000)

 

18(63) SR 2007, Resurface, SR 2007 from
19Lycoming County Line to Creamery
20Street, Segments 0010/0000 to
210020/2120, Liberty Borough, Liberty
22Township, Project ID 99394

 

23Project Allocation

1,722,000

24(Base Project Allocation - $1,701,000)

 

25(Design & Contingencies - $21,000)

 

26(64) SR 2005, Reconstruction and
27Resurfacing, SR 2005 from Main Street
28to Corey Street, Mansfield Borough,
29Project ID 101285

 

30Project Allocation

3,800,000

1(Base Project Allocation - $3,800,000)

 

2(65) SR 2022, Highway Portion Bridge
3Replacement, SR 2022 over Howland
4Creek, Covington Township, Project ID
599369

 

6Project Allocation

230,000

7(Base Project Allocation - $230,000)

 

8(66) SR 2025, Resurface, SR 2025 from SR
92005 to SR 2022, Covington and Putnam
10Townships, Project ID 99199

 

11Project Allocation

342,000

12(Base Project Allocation - $312,000)

 

13(Design & Contingencies - $30,000)

 

14(67) SR 4027, Highway Portion Bridge
15Replacement, SR 4027 over Branch of
16Cummings Creek, Farmington Township,
17Project ID 99416

 

18Project Allocation

230,000

19(Base Project Allocation - $230,000)

 

20(68) SR 0287, Reconstruction, PA 287 from
21US 15 to Mitchell Creek Road, Tioga
22Township, Project ID 99170

 

23Project Allocation

880,000

24(Base Project Allocation - $880,000)

 

25(69) SR 0660, Highway Portion Bridge
26Replacement, PA 660 over Tributary of
27North Elk Run, BMS 58-0660-0250-1661,
28Richmond Township, Project ID 99138

 

29Project Allocation

1,200,000

30(Base Project Allocation - $1,200,000)

 

1(70) SR 2020, Highway Portion Bridge
2Rehabilitation, SR 2020 over North Elk
3Run, Covington Township, Project ID
498470

 

5Project Allocation

900,000

6(Base Project Allocation - $900,000)

 

7(71) SR 2017, Highway Portion Bridge
8Rehabilitation, SR 2017 over Taylor
9Run, Hamilton Township, Project ID
1098465

 

11Project Allocation

900,000

12(Base Project Allocation - $900,000)

 

13(72) SR 0349, Reconstruction, PA 349 from
14Ladd Road to PA 49, Westfield Borough,
15Westfield Township, Project ID 99171

 

16Project Allocation

2,921,000

17(Base Project Allocation - $2,695,000)

 

18(Land Allocation - $26,000)

 

19(Design & Contingencies - $200,000)

 

20(73) SR 0414, Reconstruction, PA 414 from
21US 15 to SR 2005 (Water Street),
22Liberty Borough, Project ID 99173

 

23Project Allocation

1,925,000

24(Base Project Allocation - $1,800,000)

 

25(Design & Contingencies - $125,000)

 

26(74) SR 1015, Resurface, SR 1015 from PA
2749 to the New York State Line,
28Lawrenceville Borough, Project ID
2999187

 

30Project Allocation

91,000

1(Base Project Allocation - $76,000)

 

2(Design & Contingencies - $15,000)

 

3(75) SR 2005, Resurface, SR 2005 from
4Tioga River to Covington, Covington
5and Putnam Townships, Project ID 99189

 

6Project Allocation

32,000

7(Base Project Allocation - $6,000)

 

8(Design & Contingencies - $26,000)

 

9(76) SR 2005, Resurface, SR 2005 from
10Cowan Road to PA 660, Covington
11Township, Project ID 99190

 

12Project Allocation

135,000

13(Base Project Allocation - $110,000)

 

14(Design & Contingencies - $25,000)

 

15(77) SR 2005, Resurface, SR 2005 from
16Covington to Cowan Road, Putnam
17Township, Project ID 99191

 

18Project Allocation

81,000

19(Base Project Allocation - $50,000)

 

20(Design & Contingencies - $31,000)

 

21(78) SR 2022, Resurface, SR 2022 from SR
222020 to SR 2005, Covington and Putnam
23Townships, Project ID 99192

 

24Project Allocation

685,000

25(Base Project Allocation - $630,000)

 

26(Design & Contingencies - $55,000)

 

27(79) SR 0049, Resurface, PA 49 from Taft
28Avenue to 0.5 Mile West of Barney Hill
29Road, Elkland Borough, Nelson
30Township, Project ID 99168

 

1Project Allocation

3,475,000

2(Base Project Allocation - $3,475,000)

 

3(80) SR 2022, Resurface, SR 2022 from
4Corey Creek to the Bradford County
5Line, Sullivan Township, Project ID
699197

 

7Project Allocation

615,000

8(Base Project Allocation - $569,000)

 

9(Design & Contingencies - $46,000)

 

10(81) SR 0049, Reconstruction, PA 49 from
11Water Tower Road to PA 287, Lawrence
12Township, Lawrenceville Borough,
13Project ID 99169

 

14Project Allocation

1,750,000

15(Base Project Allocation - $1,750,000)

 

16(82) SR 3007, Resurface, SR 3007 from
17Tiadaghton Hill Road to Stony Fork
18Creek, Delmar Township, Project ID
1999201

 

20Project Allocation

519,000

21(Base Project Allocation - $473,000)

 

22(Design & Contingencies - $46,000)

 

23(83) SR 3011, Resurface, SR 3011 from
24Calkins Road to Valley View Estate
25Road, Charleston Township, Project ID
2699202

 

27Project Allocation

323,000

28(Base Project Allocation - $292,000)

 

29(Design & Contingencies - $31,000)

 

30(84) SR 4002, Resurface, SR 4002 from US

 

16 to Fellows Avenue, Wellsboro
2Borough, Project ID 99204

 

3Project Allocation

123,000

4(Base Project Allocation - $78,000)

 

5(Design & Contingencies - $45,000)

 

6(85) SR 4009, Resurface, SR 4009 from PA
749 to the New York State Line,
8Brookfield and Westfield Townships,
9Project ID 99206

 

10Project Allocation

926,000

11(Base Project Allocation - $877,000)

 

12(Design & Contingencies - $49,000)

 

13(86) SR 4023, Resurface, SR 4023 from PA
1449 to the New York State Line, Elkland
15Borough, Project ID 99209

 

16Project Allocation

399,000

17(Base Project Allocation - $359,000)

 

18(Design & Contingencies - $40,000)

 

19(87) SR 4039, Resurface, SR 4039 from SR
204037 to Reese Hill Road, Charleston
21Township, Project ID 99214

 

22Project Allocation

588,000

23(Base Project Allocation - $542,000)

 

24(Design & Contingencies - $46,000)

 

25(88) SR 4039, Resurface, SR 4039 from
26Reese Hill Road to SR 0287, Charleston
27and Middlebury Townships, Project ID
2899217

 

29Project Allocation

671,000

30(Base Project Allocation - $620,000)

 

1(Design & Contingencies - $51,000)

 

2(89) SR 0049, Resurface, PA 49 from
3Woodbine Avenue to Troups Creek,
4Deerfield Township, Knoxville Borough,
5Westfield Township, Project ID 99224

 

6Project Allocation

168,000

7(Base Project Allocation - $93,000)

 

8(Design & Contingencies - $75,000)

 

9(90) SR 0549, Highway Portion Bridge
10Replacement, PA 549 over Tributary of
11Mill Creek, Rutland Township, Project
12ID 99315

 

13Project Allocation

1,400,000

14(Base Project Allocation - $1,400,000)

 

15(91) SR 0249, Highway Portion Bridge
16Replacement, PA 249 over Tributary of
17Crooked Creek, Chatham Township,
18Project ID 99314

 

19Project Allocation

1,400,000

20(Base Project Allocation - $1,400,000)

 

21(92) SR 0414, Highway Portion Bridge
22Rehabilitation, PA 414 over Blockhouse
23Creek, Liberty Borough, Project ID
2499312

 

25Project Allocation

1,000,000

26(Base Project Allocation - $1,000,000)

 

27(93) SR 4017, Slide Repair, SR 4017 from
28Briar Hill Road to Osceola, Osceola
29Township, Project ID 98117

 

30Project Allocation

1,400,000

1(Base Project Allocation - $1,200,000)

 

2(Land Allocation - $50,000)

 

3(Design & Contingencies - $150,000)

 

4(94) SR 2022, Resurface, SR 2022 from
5Welch Mountain Road to Corey Creek,
6Sullivan Township, Project ID 99196

 

7Project Allocation

559,000

8(Base Project Allocation - $518,000)

 

9(Design & Contingencies - $41,000)

 

10(95) SR 2005, Highway Portion Bridge
11Replacement, SR 2005 over Frost Creek,
12BMS 58-2005-0300-0000, Covington
13Township, Project ID 99140

 

14Project Allocation

1,400,000

15(Base Project Allocation - $1,400,000)

 

16(96) SR 0006, Resurface, US 6 from
17Sassafras Street to 0.5 Mile East of
18Old Mainsburg Road, Mansfield Borough,
19Richmond Township, Project ID 99424

 

20Project Allocation

2,900,000

21(Base Project Allocation - $2,900,000)

 

22(97) SR 0006, Reconstruction, US 6 from
230.5 Mile East of Old Mainsburg Road to
24Strange Road, Richmond and Sullivan
25Townships, Project ID 99426

 

26Project Allocation

8,250,000

27(Base Project Allocation - $8,250,000)

 

28(98) SR 0414, Highway Portion Bridge
29Rehabilitation, PA 414 over Blacks
30Creek, BMS 58-0414-0350-0000, Liberty

 

1Township, Project ID 99136

 

2Project Allocation

400,000

3(Base Project Allocation - $400,000)

 

4(99) SR 0015, Resurface, US 15 from SR
52005 to Tioga River, Blossburg
6Borough, Covington and Richmond
7Townships, Project ID 99427

 

8Project Allocation

4,375,000

9(Base Project Allocation - $4,375,000)

 

10(100) SR 0287, Reconstruction, PA 287
11from US 15 to Tioga River, Lawrence
12Township, Lawrenceville Borough, Tioga
13Township, Project ID 99428

 

14Project Allocation

9,350,000

15(Base Project Allocation - $9,350,000)

 

16(101) SR 0287, Resurface, PA 287 from
17Crooked Creek to Bentley Creek, Tioga
18Borough, Tioga Township, Project ID
1999429

 

20Project Allocation

3,375,000

21(Base Project Allocation - $3,375,000)

 

22(102) SR 0549, Resurface, PA 549 from US
236 to SR 1005, Richmond Township,
24Roseville Borough, Rutland and
25Sullivan Townships, Project ID 99441

 

26Project Allocation

3,040,000

27(Base Project Allocation - $3,040,000)

 

28(103) SR 2022, Highway Portion Bridge
29Rehabilitation, SR 2022 over a
30Tributary of Corey Creek, Sullivan

 

1Township, Project ID 98478

 

2Project Allocation

700,000

3(Base Project Allocation - $700,000)

 

4(104) SR 1013, Highway Portion Bridge
5Rehabilitation, SR 1013 over Hammond
6Creek, BMS 58-1013-0100-2257, Jackson
7Township, Project ID 99139

 

8Project Allocation

800,000

9(Base Project Allocation - $800,000)

 

10(105) SR 1001, Resurface, SR 1001 from SR
110006 to SR 4002, Charleston Township,
12Project ID 99167

 

13Project Allocation

72,000

14(Base Project Allocation - $56,000)

 

15(Design & Contingencies - $16,000)

 

16(106) SR 0328, Resurface, SR 0328 from
17Button Hill Road to SR 1013, Jackson
18Township, Project ID 99151

 

19Project Allocation

102,000

20(Base Project Allocation - $62,000)

 

21(Design & Contingencies - $40,000)

 

22(107) SR 0660, Resurface, SR 0660 from
23Spencer Road to SR 2005, Covington and
24Richmond Townships, Project ID 99161

 

25Project Allocation

112,000

26(Base Project Allocation - $66,000)

 

27(Design & Contingencies - $46,000)

 

28(108) SR 0660, Resurface, SR 0660 from
29Benauer Road to SR 0287, Wellsboro
30Borough, Project ID 99165

 

1Project Allocation

33,000

2(Base Project Allocation - $7,000)

 

3(Design & Contingencies - $26,000)

 

4(109) SR 0015, Guide Sign Upgrade, US 15,
5Various Municipalities, Project ID
699164

 

7Project Allocation

75,000

8(Base Project Allocation - $75,000)

 

9(110) SR 0015, Guiderail Upgrade, US 15
10from PA 414 to PA 287, Tioga,
11Richmond, Covington, Bloss and Liberty
12Townships, Blossburg and Mansfield
13Boroughs, Project ID 99162

 

14Project Allocation

2,350,000

15(Base Project Allocation - $2,350,000)

 

16(111) SR 0328, Resurface, SR 0328 from SR
171013 to the Bradford County Line,
18Jackson Township, Project ID 99152

 

19Project Allocation

108,000

20(Base Project Allocation - $63,000)

 

21(Design & Contingencies - $45,000)

 

22(112) SR 0006, Resurface, US 6 from the
23Potter County Line to Long Run, Gaines
24Township, Project ID 99160

 

25Project Allocation

1,521,000

26(Base Project Allocation - $1,501,000)

 

27(Design & Contingencies - $20,000)

 

28(113) SR 2027, Highway Portion Bridge
29Rehabilitation, SR 2027 over Canoe
30Camp Creek, Richmond Township, Project

 

1ID 98514

 

2Project Allocation

900,000

3(Base Project Allocation - $900,000)

 

4(114) SR 0660, Resurface, SR 0660 from SR
54002 to Spencer Road, Charleston and
6Richmond Townships, Project ID 99154

 

7Project Allocation

114,000

8(Base Project Allocation - $68,000)

 

9(Design & Contingencies - $46,000)

 

10(115) SR 0349, Resurface, SR 0349 from
11Elk Lick Run to Mill Creek, Clymer
12Township, Project ID 99153

 

13Project Allocation

121,000

14(Base Project Allocation - $75,000)

 

15(Design & Contingencies - $46,000)

 

16(116) SR 4039, Highway Portion Bridge
17Rehabilitation, SR 4039 over Hills
18Creek, Charleston Township, Project ID
1998515

 

20Project Allocation

1,212,000

21(Base Project Allocation - $1,201,000)

 

22(Design & Contingencies - $11,000)

 

23(117) SR 0660, Resurface, SR 0660 from
24Benauer Road to SR 0287, Delmar
25Township, Wellsboro Borough, Project
26ID 99163

 

27Project Allocation

235,000

28(Base Project Allocation - $145,000)

 

29(Design & Contingencies - $90,000)

 

30(118) Various, Highway Portion Bridge

 

1Painting, Various State Routes,
2Various Municipalities, Project ID
397675

 

4Project Allocation

1,712,000

5(Base Project Allocation - $1,701,000)

 

6(Design & Contingencies - $11,000)

 

7Section 360. Union County.

8Projects are as follows:

 

9(1) (Reserved).

 

10(2) SR 0192, Resurface, SR 0192 from
11Forestry Road to SR 2001 (Beaver Run
12Road), SR 0192 Segments 0150/0000 to
130280/2487, Buffalo and West Buffalo
14Townships, Project ID 88937

 

15Project Allocation

2,321,000

16(Base Project Allocation - $2,321,000)

 

17(3) SR 3005, Highway Portion Bridge
18Replacement, SR 3005 (Pleasant Groove
19Road) over Branch of Buffalo Creek,
20BMS 59-3005-0090-0575, Lewis Township,
21Project ID 88029

 

22Project Allocation

220,000

23(Base Project Allocation - $140,000)

 

24(Land Allocation - $30,000)

 

25(Design & Contingencies - $50,000)

 

26(4) SR 0015, Roadway Rehabilitation, US
2715 and SR 0192 Intersection, US 15
28Segments 0190/0282 through 0190/0937,
29Lewisburg Borough, Project ID 97657

 

30Project Allocation

106,000

1(Base Project Allocation - $90,000)

 

2(Design & Contingencies - $16,000)

 

3(5) SR 0045, Highway Portion Bridge
4Replacement, SR 0045 over Cold Run,
5BMS 59-0045-0160-1482, Hartleton
6Borough, Project ID 97646

 

7Project Allocation

1,323,000

8(Base Project Allocation - $1,021,000)

 

9(Land Allocation - $101,000)

 

10(Design & Contingencies - $201,000)

 

11(6) SR 0015, Roadway Rehabilitation, US
1215 and SR 0045 Intersection, US 15
13Segments 0170/1375 through 0180/0428,
140171/1375, 0181/0419, East Buffalo
15Township, Lewisburg Borough, Project
16ID 97659

 

17Project Allocation

170,000

18(Base Project Allocation - $160,00)

 

19(Design & Contingencies - $10,000)

 

20(7) SR 0080, Resurface, I-80 from Clinton
21County to SR 4001, Lewis and West
22Buffalo Townships, Project ID 97528

 

23Project Allocation

4,271,000

24(Base Project Allocation - $4,250,000)

 

25(Design & Contingencies - $21,000)

 

26(8) SR 0044, Mill and Resurface, SR 0044
27from the Northumberland County Line to
28SR 1014, Segments 0010/0000 to
290040/2319, Gregg Township, Project ID
3088938

 

1Project Allocation

163,000

2(Base Project Allocation - $152,000)

 

3(Design & Contingencies - $11,000)

 

4(9) SR 0080, Mill and Resurface, Clinton
5County to SR 4001, Segments 1944/0000
6to 1984/2622, Lewis and West Buffalo
7Townships, Project ID 93481

 

8Project Allocation

5,011,000

9(Base Project Allocation - $5,000,000)

 

10(Design & Contingencies - $11,000)

 

11(10) SR 1004, Safety Improvement, Curve
12Realignment, SR 1004 (Cross Roads
13Drive) between White Churchs Road and
14JPM Road, Segments 0100/0737 to
150120/2502, Kelly Township, Project ID
1688623

 

17Project Allocation

624,000

18(Base Project Allocation - $624,000)

 

19(11) SR 0015, Roadway Intersection
20Improvement, Signal Upgrade, US 15 at
2111 Intersections, SR 0015, Segments
220150/0836 through 0250/0000, East
23Buffalo and Kelly Townships and
24Lewisburg Borough, Project ID 97649

 

25Project Allocation

603,000

26(Base Project Allocation - $401,000)

 

27(Land Allocation - $41,000)

 

28(Design & Contingencies - $161,000)

 

29(12) SR 0045, Resurface, PA 45 from SR
303007 to Buffalo Township Line,

 

1Segments 0290/0000 to 0310/0755,
2Buffalo Township, Mifflinburg Borough,
3Project ID 97720

 

4Project Allocation

412,000

5(Base Project Allocation - $391,000)

 

6(Design & Contingencies - $21,000)

 

7(13) SR 0080, Mill and Resurface, I-80
8Westbound from Old Route 15 to White
9Deer Pike, Includes Bridge Work over
10Old Route 15, SR 0015 and Dietrick
11Road, Segments/Offset 2071/0950 to
122101/2174, BMS 59-0080-0291-2208, BMS
1359-0080-2101-0617, BMS 59-0080-2101-
141956, White Deer Township, Project ID
1587574

 

16Project Allocation

352,000

17(Base Project Allocation - $299,000)

 

18(Design & Contingencies - $53,000)

 

19(14) SR 0080, Mill and Resurface, I-80
20Eastbound from Gray Hill Road to Old
21Route 15, Includes Bridge Work over
22Yonkin Road, SR 0015 and Old Route 15,
23Segments/Offset 2074/1920 to
242100/2207, BMS 59-0080-2090-2089, BMS
2559-0080-2100-0653, BMS 59-0080-2100-
261993, White Deer Township, Project ID
2787572

 

28Project Allocation

205,000

29(Base Project Allocation - $159,000)

 

30(Design & Contingencies - $46,000)

 

1(15) SR 0015, Mill and Resurface Roadway,
2SR 0015, Segments 0100/1956 to
30190/0282, East Buffalo Township,
4Lewisburg Borough, Project ID 87972

 

5Project Allocation

2,055,000

6(Base Project Allocation - $2,026,000)

 

7(Design & Contingencies - $29,000)

 

8(16) SR 0304, Highway Reconstruction, SR
90304 from Stein Lane to Park Road,
10Union Township, Project ID 82381

 

11Project Allocation

1,110,000

12(Base Project Allocation - $1,100,000)

 

13(Design & Contingencies - $10,000)

 

14(17) SR 1004, Resurface, SR 1004 (Cross
15Roads Drive) from SR 1001 (Spruce Run
16Road) to SR 1003 (Fort Titzell's
17Road), Kelly Township, Project ID
1897747

 

19Project Allocation

400,000

20(Base Project Allocation - $400,000)

 

21(18) SR 0015, Mill and Resurface Roadway,
22US 15 from Zeigler Road to SR 1008,
23Kelly and White Deer Townships,
24Project ID 87771

 

25Project Allocation

1,586,000

26(Base Project Allocation - $1,558,000)

 

27(Design & Contingencies - $28,000)

 

28(19) SR 3003, Resurface, SR 3003 (Cold
29Run Road) from PA 45 to SR 3005
30(Pleasant Grove Road), Hartleton

 

1Borough, Hartley and Lewis Townships,
2Project ID 97744

 

3Project Allocation

400,000

4(Base Project Allocation - $400,000)

 

5(20) SR 1003, Resurface, SR 1003 from
6Kelly Cross Roads to New Columbia
7Road, Segments 0110/0000 to 0170/0000,
8Kelly and White Deer Townships,
9Project ID 97721

 

10Project Allocation

1,056,000

11(Base Project Allocation - $1,035,000)

 

12(Design & Contingencies - $21,000)

 

13(21) SR 0045, Highway Portion Bridge
14Replacement, SR 0045 over Limestone
15Run, East Buffalo Township, Project ID
1697592

 

17Project Allocation

1,503,000

18(Base Project Allocation - $1,301,000)

 

19(Land Allocation - $101,000)

 

20(Design & Contingencies - $101,000)

 

21(22) SR 0045, Mill and Resurface Roadway,
22SR 0045 from Swengal Road to Eighth
23Street, Segments/Offset 0250/2494 to
240270/0000, Limestone Township,
25Mifflinburg Borough, West Buffalo
26Township, Project ID 87859

 

27Project Allocation

824,000

28(Base Project Allocation - $799,000)

 

29(Design & Contingencies - $25,000)

 

30(23) SR 0045, Mill and Resurface Roadway,

 

1SR 0045, Segments 0210/1489 to
20250/2494, Lewis, Limestone and West
3Buffalo Townships, Project ID 87904

 

4Project Allocation

198,000

5(Base Project Allocation - $198,000)

 

6(24) SR 0015, Mill and Resurface Roadway,
7SR 0015 Segments 0091/1138 to
80191/0242, East Buffalo Township and
9Lewisburg Borough, Project ID 87968

 

10Project Allocation

2,506,000

11(Base Project Allocation - $2,476,000)

 

12(Design & Contingencies - $30,000)

 

13(25) SR 3012, Highway Portion Bridge
14Replacement, SR 3012 over Sweitzers
15Run, BMS 59-3012-0090-0682, Limestone
16Township, Project ID 97591

 

17Project Allocation

1,503,000

18(Base Project Allocation - $1,301,000)

 

19(Land Allocation - $101,000)

 

20(Design & Contingencies - $101,000)

 

21(26) SR 0015, Highway Portion Bridge
22Rehabilitation, US 15 over Winfield
23Creek, BMS 59-0015-0060-0377, Union
24Township, Project ID 97633

 

25Project Allocation

1,822,000

26(Base Project Allocation - $1,500,000)

 

27(Land Allocation - $101,000)

 

28(Design & Contingencies - $221,000)

 

29(27) I-80, Major Guide Sign Replacement,
30I-80 in Union County, Various

 

1Municipalities, Project ID 99346

 

2Project Allocation

70,000

3(Base Project Allocation - $60,000)

 

4(Design & Contingencies - $10,000)

 

5(28) SR 0015, Slide Repair, SR 0015
6Northbound Between White Deer Hole
7Creek and Gregg/White Deer Township's
8Line, Gregg Township, Project ID 99242

 

9Project Allocation

151,000

10(Design & Contingencies - $151,000)

 

11(29) I-80, Reconstruction, I-80 from the
12Centre County Line to the
13Northumberland County Line, Various
14Municipalities, Project ID 0

 

15Project Allocation

64,800,000

16(Base Project Allocation -
17$64,800,000)

 

18(30) SR 0045, Highway Portion Bridge
19Replacement, SR 0045 over Limestone
20Run, BMS 59-0045-0390-1769, East
21Buffalo Township, Project ID 99134

 

22Project Allocation

321,000

23(Land Allocation - $100,000)

 

24(Design & Contingencies - $221,000)

 

25(31) SR 1011, Resurface, SR 1011 from
26High Street to SR 1010, White Deer
27Township, Project ID 99249

 

28Project Allocation

2,701,000

29(Base Project Allocation - $2,601,000)

 

30(Design & Contingencies - $100,000)

 

1(32) SR 0015, Resurface, SR 0015 from I-
280 to White Deer Creek, White Deer
3Township, Project ID 99253

 

4Project Allocation

891,000

5(Base Project Allocation - $870,000)

 

6(Design & Contingencies - $21,000)

 

7(33) SR 0015, Resurface, SR 0015 White
8Deer Township to the Village of
9Allenwood, Gregg and White Deer
10Townships, Project ID 99273

 

11Project Allocation

610,000

12(Base Project Allocation - $590,000)

 

13(Design & Contingencies - $20,000)

 

14(34) SR 0015, Major Guide Sign
15Replacement, SR 0015 in Union County,
16Various Municipalities, Project ID
1799344

 

18Project Allocation

110,000

19(Base Project Allocation - $100,000)

 

20(Design & Contingencies - $10,000)

 

21(35) SR 1011, Highway Portion Bridge
22Replacement, SR 1011 over Tributary of
23Susquehanna River, White Deer
24Township, Project ID 99141

 

25Project Allocation

255,000

26(Base Project Allocation - $255,000)

 

27(36) SR 0015, Intersection Improvement,
28Intersection of SR 0015 and SR 1002,
29Kelly Township, Project ID 99353

 

30Project Allocation

100,000

1(Design & Contingencies - $100,000)

 

2(37) SR 0015, Highway Portion Bridge
3Replacement, SR 0015 over Turtle
4Creek, BMS 59-0015-0091-1230, East
5Buffalo Township, Project ID 98883

 

6Project Allocation

350,000

7(Land Allocation - $100,000)

 

8(Design & Contingencies - $250,000)

 

9(38) SR 1011, Highway Portion Bridge
10Replacement, SR 1011 over Tributary of
11Susquehanna River, BMS 59-1011-0010-
120671, Kelly Township, Project ID 99137

 

13Project Allocation

401,000

14(Land Allocation - $101,000)

 

15(Design & Contingencies - $300,000)

 

16(39) SR 0045, Resurface, SR 0045,
17Segments 0150/0000 to 0160/2000,
18Hartleton Borough, Hartley Township,
19Project ID 99277

 

20Project Allocation

610,000

21(Base Project Allocation - $590,000)

 

22(Design & Contingencies - $20,000)

 

23(40) SR 0304, Resurface Roadway, SR 0304
24from SR 0045 to Front Street,
25Limestone Township, Mifflinburg and
26New Berlin Boroughs, Project ID 98895

 

27Project Allocation

202,000

28(Base Project Allocation - $127,000)

 

29(Design & Contingencies - $75,000)

 

30(41) SR 3006, Highway Portion Bridge

 

1Replacement, SR 3006 over Cold Run,
2BMS 59-3006-0050-0282, Lewis Township,
3Project ID 98826

 

4Project Allocation

82,000

5(Land Allocation - $41,000)

 

6(Design & Contingencies - $41,000)

 

7(42) SR 3014, Highway Portion Bridge
8Replacement, SR 3014 over Turkey Run,
9BMS 59-3014-0050-1995, Limestone
10Township, Project ID 98828

 

11Project Allocation

243,000

12(Base Project Allocation - $161,000)

 

13(Land Allocation - $41,000)

 

14(Design & Contingencies - $41,000)

 

15(43) SR 0015, Resurface, SR 0015 from PA
1644 to the Lycoming County Line,
17Segments 0450/1050 to 0500/2330, Gregg
18Township, Project ID 99407

 

19Project Allocation

957,000

20(Base Project Allocation - $936,000)

 

21(Design & Contingencies - $21,000)

 

22(44) SR 0304, Resurface, SR 0304 from
23Stein Lane to Winfield, Segments
240220/0000 to 0290/1456, Union
25Township, Project ID 99409

 

26Project Allocation

1,762,000

27(Base Project Allocation - $1,741,000)

 

28(Design & Contingencies - $21,000)

 

29(45) SR 0080, Highway Portion Bridge
30Rehabilitation, I-80 Eastbound over

 

1White Deer Creek, BMS 59-0080-2070-
22087, White Deer Township, Project ID
398848

 

4Project Allocation

350,000

5(Land Allocation - $100,000)

 

6(Design & Contingencies - $250,000)

 

7(46) SR 2003, Highway Portion Bridge
8Replacement, SR 2003 over Tributary of
9Buffalo Creek, BMS 59-2003-0110-0000,
10Buffalo Township, Project ID 98786

 

11Project Allocation

275,000

12(Base Project Allocation - $150,000)

 

13(Land Allocation - $60,000)

 

14(Design & Contingencies - $65,000)

 

15(47) SR 0044, Resurface Roadway, SR 0044
16from SR 1014 to the Lycoming County
17Line, Gregg Township, Project ID 98893

 

18Project Allocation

531,000

19(Base Project Allocation - $500,000)

 

20(Design & Contingencies - $31,000)

 

21(48) SR 0015, Highway Portion Bridge
22Replacement, SR 0015 over Tributary of
23Limestone Run, BMS 59-0015-0160-0792,
24East Buffalo Township, Project ID
2599448

 

26Project Allocation

209,000

27(Base Project Allocation - $209,000)

 

28(49) SR 3007, Resurface, SR 3007 from PA
2945 to PA 192, Segments 0010/0000 to
300090/2356, Mifflinburg Borough, West

 

1Buffalo Township, Project ID 98945

 

2Project Allocation

719,000

3(Base Project Allocation - $643,000)

 

4(Design & Contingencies - $76,000)

 

5(50) SR 0304, Resurface Roadway, SR 0304
6from Front Street to Stein Lane,
7Limestone and Union Townships, Project
8ID 98903

 

9Project Allocation

141,000

10(Base Project Allocation - $66,000)

 

11(Design & Contingencies - $75,000)

 

12(51) SR 1001, Resurface Roadway, SR 1001
13from SR 0192 to SR 1002, Buffalo
14Township, Project ID 98904

 

15Project Allocation

48,000

16(Base Project Allocation - $33,000)

 

17(Design & Contingencies - $15,000)

 

18(52) SR 1001, Resurface Roadway, SR 1001
19from SR 1002 to SR 1004, Buffalo and
20Kelly Townships, Project ID 98905

 

21Project Allocation

146,000

22(Base Project Allocation - $90,000)

 

23(Design & Contingencies - $56,000)

 

24(53) SR 1005, Resurface Roadway, SR 1005
25from Saint Anthony Street to JPM Road,
26Kelly Township, Project ID 98907

 

27Project Allocation

77,000

28(Base Project Allocation - $47,000)

 

29(Design & Contingencies - $30,000)

 

30(54) SR 1008, Resurface Roadway, SR 1008

 

1from SR 1011 to SR 1009, White Deer
2Township, Project ID 98908

 

3Project Allocation

96,000

4(Base Project Allocation - $81,000)

 

5(Design & Contingencies - $15,000)

 

6(55) SR 0015, Highway Portion Bridge
7Rehabilitation, SR 0015 over SR 1008,
8BMS 59-0015-0330-0000, White Deer
9Township, Project ID 98890

 

10Project Allocation

350,000

11(Land Allocation - $100,000)

 

12(Design & Contingencies - $250,000)

 

13(56) SR 0080, Highway Portion Bridge
14Rehabilitation, Various State Routes,
15Various Municipalities, Project ID
1698705

 

17Project Allocation

259,000

18(Base Project Allocation - $248,000)

 

19(Design & Contingencies - $11,000)

 

20(57) SR 1003, Highway Portion Bridge
21Replacement, SR 1003 over Tributary of
22Little Buffalo Creek, BMS 59-1003-
230150-2950, White Deer Township,
24Project ID 98772

 

25Project Allocation

273,000

26(Base Project Allocation - $151,000)

 

27(Land Allocation - $56,000)

 

28(Design & Contingencies - $66,000)

 

29(58) SR 1003, Highway Portion Bridge
30Replacement, SR 1003 over Tributary of

 

1Little Buffalo Creek, BMS 59-1003-
20150-1340, White Deer Township,
3Project ID 98755

 

4Project Allocation

275,000

5(Base Project Allocation - $150,000)

 

6(Land Allocation - $60,000)

 

7(Design & Contingencies - $65,000)

 

8(59) SR 2002, Resurface, SR 2002 from PA
9305 to the Snyder County Line,
10Segments 0008/0000 to 0080/3038, Union
11Township, Project ID 98933

 

12Project Allocation

587,000

13(Base Project Allocation - $512,000)

 

14(Design & Contingencies - $75,000)

 

15(60) SR 1014, Highway Portion Bridge
16Replacement, SR 1014 over South Creek
17BMS 59-1014-0010-2135, Gregg Township,
18Project ID 98777

 

19Project Allocation

281,000

20(Base Project Allocation - $151,000)

 

21(Land Allocation - $65,000)

 

22(Design & Contingencies - $65,000)

 

23(61) SR 0080, Highway Portion Bridge
24Replacement, I-80 Westbound over SR
251010, BMS 59-0080-2071-0770, White
26Deer Township, Project ID 98685

 

27Project Allocation

380,000

28(Base Project Allocation - $300,000)

 

29(Land Allocation - $80,000)

 

30(62) Various, Highway Portion Bridge

 

1Preservation, Various State Routes,
2Various Municipalities, Project ID
397616

 

4Project Allocation

400,000

5(Base Project Allocation - $350,000)

 

6(Design & Contingencies - $50,000)

 

7Section 361. Venango County.

8Projects are as follows:

 

9(1) (Reserved).

 

10(2) SR 0062, Restoration/Resurface, SR
110062 from SR 2025 (Henrys Bend Road)
12to the Forest County Line, President
13Township, Project ID 97915

 

14Project Allocation

587,000

15(Base Project Allocation - $506,000)

 

16(Design & Contingencies - $81,000)

 

17(3) SR 3008, Restoration/Resurface, SR
183008 (Kennerdell Road) from Bullion
19Road to Rockland Road, Clinton and
20Rockland Townships, Project ID 97916

 

21Project Allocation

2,218,000

22(Base Project Allocation - $2,218,000)

 

23(4) SR 0062, Retaining Wall, SR 0062 
24(Allegheny Boulevard) just South of 
25City of Oil City, Sugarcreek Borough, 
26Project ID 97048

 

27Project Allocation

500,000

28(Base Project Allocation - $500,000)

 

29(5) SR 0322, Highway Restoration, Various 
30State Routes in Various
 

 

1Municipalities, Various, Project ID 
287528

 

3Project Allocation

1,500,000

4(Base Project Allocation - $1,500,000)

 

5(6) SR 0008, Resurface/Restoration, SR 
60008 (William Flinn Highway/Pittsburgh 
7Road) and SR 0062 from Polk Cutoff to 
8Bell Avenue, City of Oil City, Sandy 
9Creek Township, Project ID 76890

 

10Project Allocation

581,000

11(Base Project Allocation - $531,000)

 

12(Design & Contingencies - $50,000)

 

13(7) SR 0308, Restoration/Resurfacing, SR 
140308 from the Butler County Line to 
15Old Route 8 and SR 0322 (28th Division 
16Highway) from SR 0427 to Atlantic 
17Avenue, Clinton Township, Clintonville 
18Borough, City of Franklin, Irwin 
19Township, Sugarcreek Borough, Project 
20ID 96906

 

21Project Allocation

3,334,000

22(Base Project Allocation - $3,334,000)

 

23(8) SR 0080, Resurface, I-80 (Z H Confair 
24Highway) from Milepost 34 to Milepost 
2542, Clinton Township, Clintonville 
26Borough, Scrubgrass Township, Project 
27ID 92597

 

28Project Allocation

2,090,000

29(Base Project Allocation - $2,090,000)

 

30(9) SR 0062, Restoration/Resurfacing, SR
 

 

10062 (Main Street) from SR 3024 
2(Valley Road) to SR 0008 (15th 
3Street), French Creek Township, Polk 
4Borough, Sandy Creek Township, Project 
5ID 95595

 

6Project Allocation

437,000

7(Base Project Allocation - $437,000)

 

8(10) SR 0080, Resurface, I-80 (Z H 
9Confair Highway) from Milepost 27 to 
10Milepost 34, Barkeyville Borough, 
11Clinton Township, Clintonville 
12Borough, Irwin Township, Project ID 
1392604

 

14Project Allocation

1,995,000

15(Base Project Allocation - $1,995,000)

 

16(11) SR 0322, Restoration, SR 0322 (28th 
17Division Highway/13th Street) with 
18Railroad Crossing Involving Western 
19Pennsylvania and New York (DOT 
20#262836s), SR 0417 (Rocky Grove 
21Avenue) and SR 4006 (Meadville Pike), 
22City of Franklin, Sugarcreek Borough, 
23Project ID 96363

 

24Project Allocation

434,000

25(Base Project Allocation - $334,000)

 

26(Design & Contingencies - $100,000)

 

27(12) SR 0038, Restoration, SR 0038 from 
28Bell Road (TR 361) to SR 0322, 
29Richland and Rockland Townships, 
30Project ID 89186

 

1Project Allocation

1,781,000

2(Base Project Allocation - $1,701,000)

 

3(Design & Contingencies - $80,000)

 

4(13) SR 0322, Resurface/Restoration, SR 
50322 (28th Division Highway) from the 
6Mercer County Line to Utica Road, 
7Canal Township, Project ID 89183

 

8Project Allocation

2,591,000

9(Base Project Allocation - $2,591,000)

 

10(14) SR 6008, Restoration, SR 6008 from 
11Center Street to Seneca Street and SR 
120087 (William Flinn Highway), 
13Cornplanter Township, City of Oil 
14City, Rouseville Borough, Project ID 
1596970

 

16Project Allocation

418,000

17(Base Project Allocation - $392,000)

 

18(Design & Contingencies - $26,000)

 

19(15) SR 0036, Resurface, SR 0036 from the 
20Forest County Line to SR 0027, 
21Allegheny and Oil Creek Townships, 
22Pleasantville Borough, Project ID 
23100162

 

24Project Allocation

2,200,000

25(Base Project Allocation - $2,200,000)

 

26(16) SR 0268, Resurface, SR 0268 from the 
27Butler County Line to SR 0038, 
28Scrubgrass Township, Project ID 100082

 

29Project Allocation

231,000

30(Base Project Allocation - $231,000)

 

1(17) SR 0008, Resurface/Restoration, SR 
20008, (William Flinn Highway/Richard 
3C. Frame Highway) from the Barkeyville 
4Borough Line to the Beginning of the 
5Expressway Section, Irwin Township, 
6Project ID 98527

 

7Project Allocation

2,500,000

8(Base Project Allocation - $2,500,000)

 

9(18) SR 6008, Resurface, SR 6008 (Center 
10Street) from SR 0008 to Elm Street, 
11City of Oil City, Project ID 100067

 

12Project Allocation

400,000

13(Base Project Allocation - $400,000)

 

14(19) SR 0038, Resurface, SR 0038 
15(Emlenton-Clintonville Road) from the 
16Emlenton Borough Line to Bell Road, 
17Scrubgrass Township, Project ID 100089

 

18Project Allocation

125,000

19(Base Project Allocation - $125,000)

 

20(20) SR 0427, Resurface/Restoration, SR 
210427 (Bradleytown Road) from Academy 
22Street to Deeter Road, Cooperstown 
23Borough, Jackson and Plum Townships, 
24Project ID 98524

 

25Project Allocation

1,300,000

26(Base Project Allocation - $1,300,000)

 

27(21) SR 0417, Resurface/Restoration, SR 
280417 (Rocky Grove Avenue) from Keeley 
29Road to SR 0008, Cherrytree and 
30Oakland Townships, Sugarcreek Borough,
 

 

1Project ID 98532

 

2Project Allocation

3,500,000

3(Base Project Allocation - $3,500,000)

 

4(22) SR 0008, Resurface/Restoration, SR 
50008 (Richard C. Frame 
6Highway/Pittsburgh Road) from the 
7Bridge over TR 371 to Polk Cutoff 
8Road, Sandy Creek and Victory 
9Townships, Project ID 98519

 

10Project Allocation

5,136,000

11(Base Project Allocation - $5,136,000)

 

12(23) SR 0062, Resurface, SR 0062 (Main 
13Street/Mercer Road) from SR 3024 
14(Valley Road) to 15th Street in French 
15Creek Township, Polk Borough, Sandy 
16Creek Township, Project ID 100069

 

17Project Allocation

785,000

18(Base Project Allocation - $785,000)

 

19(24) SR 0008, Resurface, SR 0008 (William 
20Flinn Highway) from Cross Creek Resort 
21Driveway to Sopher Road, Cherrytree 
22Township, Project ID 100148

 

23Project Allocation

1,000,000

24(Base Project Allocation - $1,000,000)

 

25(25) SR 0157, Resurface, SR 0157 (Fryburg 
26Road) from SR 0062 to County Line 
27Road, Cranberry and Pine Grove 
28Townships, Project ID 100152

 

29Project Allocation

2,500,000

30(Base Project Allocation - $2,500,000)

 

1(26) SR 0257, Resurface, SR 0257 (Salina 
2Road) from SR 0322 to Innis Street, 
3Cranberry Township, Project ID 100155

 

4Project Allocation

2,200,000

5(Base Project Allocation - $2,200,000)

 

6(27) SR 4006, Resurface, SR 4006 
7(Meadville Pike) from SR 0322 to
8Rocky Grove Avenue, Sugarcreek 
9Borough, Project ID 100160

 

10Project Allocation

1,800,000

11(Base Project Allocation - $1,800,000

 

12(28) SR 3021, Resurface, SR 3021 (Pone 
13Lane) from SR 0008 to Liberty Street, 
14City of Franklin, Sandy Creek 
15Township, Project ID 100141

 

16Project Allocation

900,000

17(Base Project Allocation - $900,000)

 

18(29) SR 4002, Intersection 
19Improvement/Reconstruction, SR 0008 
20and SR 4002 (Front Street), Sugarcreek 
21Borough, Project ID 98551

 

22Project Allocation

500,000

23(Base Project Allocation - $500,000)

 

24(30) SR 0227, Resurface, SR 0227 
25(Rouseville Road) from the Rouseville 
26Borough Line to Grandview Road, 
27Cornplanter Township, Rouseville 
28Borough, Project ID 100072

 

29Project Allocation

939,000

30(Base Project Allocation - $939,000)

 

1(31) SR 0062, Safety Improvement, SR 0062 
2(Washington Crossing/Allegheny 
3Boulevard) from Liberty Street to 
4Front Street, City of Franklin, 
5Sugarcreek Borough, Project ID 98571

 

6Project Allocation

250,000

7(Base Project Allocation - $250,000)

 

8(32) SR 0965, Resurface, SR 0965 (Jackson 
9Center Polk Road) from the Mercer 
10County Line to SR 0062 French Creek 
11and Mineral Townships, Project ID 
12100178

 

13Project Allocation

2,000,000

14(Base Project Allocation - $2,000,000)

 

15(33) SR 0062, Resurface/Restoration, SR 
160062 from the Washington Crossing 
17Bridge to Halyday Run Road, Cities of 
18Franklin and Oil City, Sugarcreek 
19Borough, Project ID 98544

 

20Project Allocation

2,800,000

21(Base Project Allocation - $2,800,000)

 

22(34) I-80, Reconstruction, I-80 from the 
23Mercer County Line to the Jefferson 
24County Line, Various Municipalities, 
25Project ID 0

 

26Project Allocation

58,800,000

27(Base Project Allocation -
28$58,800,000)

 

29(35) SR 0038, Resurface, SR 0038 (Main 
30Street) from Kerr Avenue to Bell Road,
 

 

1Emlenton Borough, Richland Township, 
2Project ID 100199

 

3Project Allocation

2,000,000

4(Base Project Allocation - $2,000,000)

 

5(36) SR 0428, Resurface, SR 0428 (Halyday 
6Run Road) from Cherrytree Road to Troy 
7Center Road, Oakland and Plum 
8Townships, Project ID 100213

 

9Project Allocation

3,991,000

10(Base Project Allocation - $3,991,000)

 

11(37) SR 0322, Resurface, SR 0322 (28th 
12Division Highway) from Whipporwill 
13Road to the Clarion County Line, 
14Cranberry and Rockland Townships, 
15Project ID 100171

 

16Project Allocation

2,000,000

17(Base Project Allocation - $2,000,000)

 

18(38) SR 0427, Resurface, SR 0427 from SR 
190322 to Titan Lane, Jackson Township, 
20Sugarcreek Borough, Project ID 100166

 

21Project Allocation

2,000,000

22(Base Project Allocation - $2,000,000)

 

23(39) SR 0208, Resurface/Restoration, SR 
240208 (Barkeyville Road/Emlenton 
25Clintonville Road) from the Mercer 
26County Line to SR 0038, Barkeyville 
27Borough, Clinton Township, 
28Clintonville Borough, Irwin and 
29Scrubgrass Townships, Project ID 98555

 

30Project Allocation

2,406,000

1(Base Project Allocation - $2,406,000)

 

2(40) Various, Restoration/Resurface, SR 
30008 (William Flinn Highway), SR 0027, 
4SR 0062 (First Street) and SR 0227 
5(Rouseville Road), Cornplanter and 
6Oakland Townships, City of Oil City, 
7Oil Creek Township, Pleasantville and 
8Rouseville Boroughs, Project ID 97870

 

9Project Allocation

2,527,000

10(Base Project Allocation - $2,527,000)

 

11(41) Various State Routes, Safety 
12Improvement, Intersection Safety 
13Implementation Plan (ISIP), Various 
14State Routes, Various Municipalities 
15throughout Crawford, Forest, Venango 
16and Warren Counties, Project ID 102084

 

17Project Allocation

30,000

18(Base Project Allocation - $30,000)

 

19(42) Various State Routes, Safety
20Improvement, Various State Routes in
21Various Municipalities, Various
22Municipalities, Project ID 102101

 

23Project Allocation

30,000

24(Base Project Allocation - $30,000)

 

25Section 362. Warren County.

26Projects are as follows:

 

27(1) (Reserved).

 

28(2) SR 0957, Restoration, Resurface, SR
290957 from Miller Hill Road to SR 0062,
30Farmington Township, Pine Grove

 

1Township, Project ID 97926

 

2Project Allocation

810,000

3(Base Project Allocation - $810,000)

 

4(3) SR 0006, Restoration, SR 0006 (Warren
5Bypass) from Main Avenue to Mohawk
6Avenue with Coordination with Buffalo
7and Pittsburgh Railroad, Pleasant
8Township, Project ID 95580

 

9Project Allocation

932,000

10(Base Project Allocation - $851,000)

 

11(Design & Contingencies - $81,000)

 

12(4) SR 0027, Restoration, Resurface, SR
130027, from Ross Hill Road to SR 0426,
14Pittsfield Township, Project ID 97920

 

15Project Allocation

1,300,000

16(Base Project Allocation - $1,300,000)

 

17(5) SR 0062, Restoration, Resurface, SR
180062, SR 3001 (Oil Creek Road), SR
194001 (Piccadilly Hill Road), SR 4002,
20(Whitney Run Road), SR 4025 (Old Pine
21Valley Road), Columbus, Spring Creek
22and Watson Townships, Project ID 96907

 

23Project Allocation

3,722,000

24(Base Project Allocation - $3,722,000)

 

25(6) SR 3007, Retaining Hill, SR 3007
26(Davey Hill Road), Deerfield Township,
27Project ID 97050

 

28Project Allocation

600,000

29(Base Project Allocation - $600,000)

 

30(7) SR 0058, Slide Correction, SR 0006

 

1(Warren Bypass), Right Side MSE Wall,
2Mead Township, Project ID 87406

 

3Project Allocation

400,000

4(Base Project Allocation - $400,000)

 

5(8) SR 3017, Retaining Wall, SR 3017
6(York Hill Road), Brokenstraw
7Township, Project ID 97049

 

8Project Allocation

600,000

9(Base Project Allocation - $600,000)

 

10(9) SR 0006, Restoration, Resurface, SR
110006 (Grand Army of the Republic
12Highway) from the SR 0062 Interchange
13to the Pennsylvania State Police
14Barracks, Conewango Township, Project
15ID 95581

 

16Project Allocation

1,551,000

17(Base Project Allocation - $1,501,000)

 

18(Design & Contingencies - $50,000)

 

19(10) SR 0059, Restoration, Design and
20Build Slide Correction, SR 0059
21(Kinzua Lane), Mead Township, Project
22ID 88570

 

23Project Allocation

515,000

24(Base Project Allocation - $314,000)

 

25(Land Allocation - $50,000)

 

26(Design & Contingencies - $151,000)

 

27(11) SR 0957, Restoration, Resurface, SR
280957 from Bailey Hill Road to Page
29Hollow, Freehold and Sugar Grove
30Townships, Project ID 97923

 

1Project Allocation

750,000

2(Base Project Allocation - $750,000)

 

3(12) SR 0059, Restoration, Resurface, SR
40059 (Kinzua Road/Kinzua Lane) from SR
50006 to the McKean County Line, Mead
6Township, Project ID 97927

 

7Project Allocation

1,700,000

8(Base Project Allocation - $1,700,000)

 

9(13) SR 0006, Restoration, Resurface, SR
100006 (Grand Army of the Republic
11Highway) from Pittsfield to Mead Run,
12Brokenstraw and Pittsfield Townships,
13Project ID 98032

 

14Project Allocation

1,300,000

15(Base Project Allocation - $1,300,000)

 

16(14) SR 0006, Restoration, Resurfacing
17and Retaining Wall, SR 0006 (Warren
18Bypass) from Mohawk Avenue to the
19Allegheny and Eastern Railroad
20Crossing at Glade Bridge, Mead and
21Pleasant Townships, Project ID 95579

 

22Project Allocation

751,000

23(Base Project Allocation - $700,000)

 

24(Design & Contingencies - $51,000)

 

25(15) SR 0062, Design and Build Slide
26Correction, SR 0062 Retaining Wall,
27Watson Township, Project ID 89108

 

28Project Allocation

314,000

29(Base Project Allocation - $164,000)

 

30(Design & Contingencies - $150,000)

 

1(16) SR 1008, Restoration/Resurface, SR
21008 (Hatch Run Road) from Market
3Street to Conewango Avenue, Conewango
4and Glade Townships, Project ID 97921

 

5Project Allocation

650,000

6(Base Project Allocation - $650,000)

 

7(17) SR 0059, Wall Repair to Correct a
8Slide, SR 0059 Kinzua Lane Segment
90050, Mead Township, Project ID 86954

 

10Project Allocation

260,000

11(Base Project Allocation - $260,000)

 

12(18) SR 0062, Restoration, Resurface, SR
130062 from Waid Run to Slater Run,
14Limestone and Watson Townships,
15Project ID 97922

 

16Project Allocation

1,200,000

17(Base Project Allocation - $1,200,000)

 

18(19) SR 0426, Restoration, Resurface, SR
190426 from SR 0027 to Spring Creek,
20Pittsfield and Spring Creek Townships,
21Project ID 97925

 

22Project Allocation

830,000

23(Base Project Allocation - $830,000)

 

24(20) SR 0069, Resurface, SR 0069 from
25Jackson Run Road to Forest Street,
26Farmington and Sugar Grove Townships,
27Sugar Grove Borough, Project ID 89204

 

28Project Allocation

1,600,000

29(Base Project Allocation - $1,600,000)

 

30(21) SR 3001, Resurface, SR 3001 (Oil

 

1Creek Road) from Cobb Road to Old
2Route 77, Spring Creek Township,
3Project ID 100464

 

4Project Allocation

875,000

5(Base Project Allocation - $875,000)

 

6(22) SR 0957, Resurface, SR 0957 (Sugar
7Grove Road) from Main Street to Race
8Street, Sugar Grove Township, Sugar
9Grove Borough, Project ID 100369

 

10Project Allocation

575,000

11(Base Project Allocation - $575,000)

 

12(23) SR 0006, Restoration, SR 0006 (Grand
13Army of the Republic Highway) from
140059 to Claredon Heights, Mead
15Township, Project ID 100006

 

16Project Allocation

1,500,000

17(Base Project Allocation - $1,500,000)

 

18(24) SR 2003, Resurface, SR 2003 (Mohawk
19Avenue) from Zimmerman Hill Road to
20Pleasant Drive, Pleasant Township,
21Project ID 100501

 

22Project Allocation

775,000

23(Base Project Allocation - $775,000)

 

24(25) SR 1012, Resurface, SR 1012 (Liberty
25Street/Priest Hollow Road) from SR
260062 to Fox Hollow Road with Railroad
27Coordination with Penn Central
28Transportation Company, Pine Grove
29Township, Project ID 100371

 

30Project Allocation

150,000

1(Base Project Allocation - $150,000)

 

2(26) SR 1013, Resurface, SR 1013 (Park
3Avenue) from Pennsylvania Avenue to
4the City of Warren Line, Glade
5Township, City of Warren, Project ID
6100375

 

7Project Allocation

625,000

8(Base Project Allocation - $625,000)

 

9(27) SR 1021, Resurface, SR 1021 (Jackson
10Avenue) from Conewango Avenue to the
11City of Warren Line, City of Warren,
12Project ID 100498

 

13Project Allocation

310,000

14(Base Project Allocation - $310,000)

 

15(28) SR 4025, Resurface, SR 4025 (Old
16Pine Valley Road) from Pine Valley
17Road to Moon Road, Columbus Township,
18Project ID 100494

 

19Project Allocation

280,000

20(Base Project Allocation - $280,000)

 

21(29) SR 4002, Resurface, SR 4002 (Whitney
22Run Road) from the Erie County Line to
23Old Route 77, Spring Creek Township,
24Project ID 100492

 

25Project Allocation

750,000

26(Base Project Allocation - $750,000)

 

27(30) SR 3002, Resurface, SR 3002
28(Enterprise Road) from the Crawford
29County Line to SR 0027, Southwest
30Township, Project ID 100472

 

1Project Allocation

610,000

2(Base Project Allocation - $610,000)

 

3(31) SR 1007, Resurface, SR 1007 (Dutch
4Hill Road) from Jackson Run to Dutch
5Hill Road, Conewango Township, Project
6ID 100442

 

7Project Allocation

525,000

8(Base Project Allocation - $525,000)

 

9(32) SR 1013, Resurface, SR 1013 (Scandia
10Road) from Cole Hill Road to Normand
11Road, Elk Township, 100445

 

12Project Allocation

1,104,000

13(Base Project Allocation - $1,104,000)

 

14(33) SR 3008, Resurface, SR 3008
15(Sundback Road) from the Crawford
16County Line to Spring Creek Road,
17Eldred Township, Project ID 100485

 

18Project Allocation

625,000

19(Base Project Allocation - $625,000)

 

20(34) SR 3022, Resurface, SR 3022 (East
21Main Street/National Forge Road) from
22the Youngsville Borough Line to SR
230027, Brokenstraw Township, Project ID
24100521

 

25Project Allocation

850,000

26(Base Project Allocation - $850,000)

 

27(35) SR 0069, Resurface, SR 0069 (Jackson
28Run Road) from Matthews Run Road to SR
294019(Catlin Hill Road), Sugar Grove
30Township, Sugar Grove Borough, Project

 

1ID 100432

 

2Project Allocation

675,000

3(Base Project Allocation - $675,000)

 

4(36) SR 2012, Resurface, SR 2012
5(Grunderville Road) from SR 0062 to
6the Dead End, Pleasant Township,
7Project ID 100459

 

8Project Allocation

625,000

9(Base Project Allocation - $625,000)

 

10(37) SR 1011, Resurface, SR 1011
11(Conewango Avenue) from the City of
12Warren Line to Hatch Drive, Glade
13Township, Project ID 100437

 

14Project Allocation

650,000

15(Base Project Allocation - $650,000)

 

16(38) SR 4001, Resurface, SR 4001
17(Piccadilly Hill Road/Sample Flats
18Road) from Old Route 77 to SR 0426
19with Railroad Coordination with
20Buffalo and Pittsburgh Railroad,
21Columbus and Spring Creek Townships,
22Project ID 100491

 

23Project Allocation

1,800,000

24(Base Project Allocation - $1,800,000)

 

25(39) SR 3016, Resurface, SR 3016 (Couvers
26Crossing Road/Old Pittsfield Road)
27from Crippen Hill Road to SR 0027 with
28Railroad Coordination with Buffalo and
29Pittsburgh Railroad, Brokenstraw
30Township, Youngsville Borough, Project

 

1ID 100490

 

2Project Allocation

620,000

3(Base Project Allocation - $620,000)

 

4(40) SR 1025, Resurface, SR 1025 (Page
5Hollow Road) from Cobham Park Road to
6Scandia Road, Glade Township, Project
7ID 100453

 

8Project Allocation

600,000

9(Base Project Allocation - $600,000)

 

10(41) SR 3004, Resurface, SR 3004 (Burly
11Road/Selkirk Road) from the Crawford
12County Line to SR 0027, Eldred and
13Southwest Townships, Project ID 100478

 

14Project Allocation

1,350,000

15(Base Project Allocation - $1,350,000)

 

16(42) SR 0062, Slide
17Correction/Reconstruction, SR 0062
18Segment 0190, Watson Township, Project
19ID 102546

 

20Project Allocation

1,500,000

21(Base Project Allocation - $1,500,000)

 

22(43) SR 0006, Resurface, SR 0006 (Grand
23Army of the Republic Highway) from the
24Erie County Line to Freehold Township,
25Columbus and Freehold Townships,
26Project ID 100335

 

27Project Allocation

1,882,000

28(Base Project Allocation - $1,882,000)

 

29(44) SR 0062, Resurface, SR 0062 (Market
30Street Extension) from Penn Avenue to

 

1Hatch Run Road with Railroad
2Coordination, Conewango Township, City
3of Warren, Project ID 100320

 

4Project Allocation

1,500,000

5(Base Project Allocation - $1,500,000)

 

6(45) SR 0127, Resurface, SR 0127 (Main
7Street/Buckingham Street) from the
8Tidioute Borough Line to SR 0062,
9Limestone Township, Tidioute Borough,
10Project ID 100366

 

11Project Allocation

600,000

12(Base Project Allocation - $600,000)

 

13(46) SR 0006, Resurface, SR 0006 (Grand
14Army of the Republic Highway) from
15Barton Run to Youngsville, Brokenstraw
16and Pittsfield Townships, Youngsville
17Borough, Project ID 99636

 

18Project Allocation

1,125,000

19(Base Project Allocation - $1,125,000)

 

20(47) SR 0006, Resurface, SR 0006 (Grand
21Army of the Republic Highway) from SR
220666 to the McKean County Line,
23Sheffield Township, Project ID 100318

 

24Project Allocation

780,000

25(Base Project Allocation - $780,000)

 

26(48) SR 0948, Resurface, SR 0948
27(Brookston Road) from SR 0666 to the
28Forest County Line, Sheffield
29Township, Project ID 100313

 

30Project Allocation

720,000

1(Base Project Allocation - $720,000)

 

2(49) SR 0666, Resurface, SR 0666 (David
3Zeisburger Highway) from SR 0948 to
4Pickering Street with Coordination
5with Buffalo and Pittsburgh Railroad
6(DOT #505735f), Sheffield Township,
7Project ID 100246

 

8Project Allocation

1,000,000

9(Base Project Allocation - $1,000,000)

 

10(50) SR 1021, Resurface, SR 1021 (Jackson
11Avenue) from Conewango Avenue to
12Scandia Road, Glade Township, Project
13ID 100526

 

14Project Allocation

675,000

15(Base Project Allocation - $675,000)

 

16(51) SR 0426, Resurface, SR 0426 from old
17Route 77 to the Erie County Line,
18Columbus and Spring Creek Townships,
19Project ID 100525

 

20Project Allocation

1,500,000

21(Base Project Allocation - $1,500,000)

 

22(52) SR 3009, Resurface, SR 3009
23(Tidioute Creek Road) from the
24Tidioute Borough Line to SR 0027,
25Deerfield and Triumph Townships,
26Project ID 100520

 

27Project Allocation

1,805,000

28(Base Project Allocation - $1,805,000)

 

29(53) SR 1029, Resurface, SR 1029 (Jackson
30Street/State Street) from Jackson Run

 

1Road to SR 0062, Conewango Township,
2Project ID 100325

 

3Project Allocation

450,000

4(Base Project Allocation - $450,000)

 

5(54) SR 1017, Resurface, SR 1017 (Market
6Street) from Penn Avenue to 4th Avenue
7with Railroad Coordination, City of
8Warren, Project ID 100323

 

9Project Allocation

600,000

10(Base Project Allocation - $600,000)

 

11(55) SR 0027, Intersection
12Improvement/Reconstruction, SR 0027
13(Main Street) and SR 0006
14Intersection, Pittsfield Township,
15Youngsville Borough, Project ID 98579

 

16Project Allocation

500,000

17(Base Project Allocation - $500,000)

 

18(56) SR 3009, Resurface, SR 3009 (Main
19Street/Elm Street) from SR 0127 to the
20Tidioute Borough Line, Tidioute
21Borough, Triumph Township, Project ID
22100361

 

23Project Allocation

525,000

24(Base Project Allocation - $525,000)

 

25(57) SR 0006, Intersection
26Improvement/Reconstruction, SR 0006
27(Grand Army of the Republic Highway)
28and Railroad Street Intersection,
29Youngsville Borough, Project ID 98580

 

30Project Allocation

800,000

1(Base Project Allocation - $800,000)

 

2(58) SR 3015, Resurface, SR 3015 (Sanford
3Road) from SR 0027 to Mickell Hill
4Road, Eldred Township, Project ID
5100519

 

6Project Allocation

910,000

7(Base Project Allocation - $910,000)

 

8(59) SR 3014, Resurface, SR 3014 (Kane
9Road/Old Garland Road) from SR 0027 to
10Davey Hill Road, Pittsfield Township,
11Project ID 100515

 

12Project Allocation

1,200,000

13(Base Project Allocation - $1,200,000)

 

14(60) SR 3011, Resurface, SR 3011 (McGuire
15Street/Ross Hill Road) from Main
16Street to SR 0027, Deerfield and
17Pittsfield Townships, Tidioute
18Borough, Project ID 100512

 

19Project Allocation

2,100,000

20(Base Project Allocation - $2,100,000)

 

21(61) SR 3010, Resurface, SR 3010 (Old
22Route 77) from the Crawford County
23Line to Blue Eye Road with Railroad
24Coordination with Buffalo and
25Pittsburgh Railroad, Spring Creek
26Township, Project ID 100509

 

27Project Allocation

1,575,000

28(Base Project Allocation - $1,575,000)

 

29(62) SR 3007, Resurface, SR 3007 (Davey
30Hill Road) from East Main Street to

 

1Segment 0140, Deerfield Township,
2Tidioute Borough, Project ID 100507

 

3Project Allocation

1,800,000

4(Base Project Allocation - $1,800,000)

 

5(63) SR 3007, Resurface, SR 3007 (Davey
6Hill Road/Dalrymple Street) from
7Andrews Run Road to SR 0006 with
8Railroad Coordination with Allegheny
9and Eastern Railroad, Pittsfield
10Township, Project ID 100505

 

11Project Allocation

610,000

12(Base Project Allocation - $610,000)

 

13(64) SR 3007, Resurface, SR 3007 (Davey
14Hill Road) from Segment 0140 to
15Andrews Run Road, Deerfield and
16Pittsfield Townships, Project ID
17100504

 

18Project Allocation

1,800,000

19(Base Project Allocation - $1,800,000)

 

20(65) SR 3022, Resurface, SR 3022 (East
21Main Street) from SR 0027 to the
22Youngsville Borough Line, Brokenstraw
23Township, Youngsville Borough, Project
24ID 100363

 

25Project Allocation

625,000

26(Base Project Allocation - $625,000)

 

27(66) SR 0346, Resurface, SR 0346 from the
28New York State Line to the McKean
29County Line, Mead Township, Project ID
30100524

 

1Project Allocation

500,000

2(Base Project Allocation - $500,000)

 

3(67) Various, Resurface, SR 1009 (Swede
4Hill Road), SR 1011 (Conewango
5Avenue), SR 1012 (Linerty Street), and
6SR 1013 (Scandia Road), Elk, Glade and
7Pine Grove Townships, Project ID 97871

 

8Project Allocation

2,100,000

9(Base Project Allocation - $2,100,000)

 

10Section 363. Washington County.

11Projects are as follows:

 

12(1) (Reserved).

 

13(2) SR 4029, Highway Portion Bridge
14Replacement, SR 4029 over Branch of
15North Fork Cross Creek, Cross Creek
16Township, Project ID 88074

 

17Project Allocation

283,000

18(Land Allocation - $37,000)

 

19(Design and Contingencies - $246,000)

 

20(3) SR 4057, Highway Portion Bridge
21Replacement, SR 4057 over Brush Run,
22Buffalo and Hopewell Townships,
23Project ID 89052

 

24Project Allocation

1,000,000

25(Base Project Allocation - $1,000,000)

 

26(4) SR 0018, Highway Portion Bridge
27Replacement, PA 18 over Chartiers
28Creek, South Franklin Township,
29Project ID 79365

 

30Project Allocation

1,609,000

1(Base Project Allocation - $1,171,000)

 

2(Land Allocation - $123,000)

 

3(Design & Contingencies - $315,000)

 

4(5) SR 0837, Highway Restoration, PA 837,
5Donora Borough, Washington County from
6Segment 0150 Offset 0744 to Segment
70220 Offset 3182, Carroll Township,
8Donora Borough, City of Monongahela,
9New Eagle Borough, Union Township,
10Project ID 95287

 

11Project Allocation

501,000

12(Design & Contingencies - $501,000)

 

13(6) SR 0018, Highway Portion Bridge
14Replacement, PA 18 over Ten Mile
15Creek, Morris Township, Project ID
1677853

 

17Project Allocation

481,000

18(Base Project Allocation - $402,000)

 

19(Land Allocation - $22,000)

 

20(Design & Contingencies - $57,000)

 

21(7) SR 0136, Highway Portion Bridge
22Replacement, PA 136 over Branch of
23Little Chartiers Creek, South Strabane
24Township, Project ID 76053

 

25Project Allocation

1,818,000

26(Base Project Allocation - $1,581,000)

 

27(Land Allocation - $65,000)

 

28(Design & Contingencies - $172,000)

 

29(8) I-70, Interstate Restoration, I-70
30from SR 0221 to Mall, Various

 

1Municipalities, Project ID 61989

 

2Project Allocation

720,000

3(Base Project Allocation - $720,000)

 

4(9) SR 1009, Safety Improvement, SR 1009
5through Canonsburg between US 19 and
6I-79, Canonsburg Borough, Project ID
783446

 

8Project Allocation

406,000

9(Base Project Allocation - $406,000)

 

10(10) SR 0018, Safety Improvements, PA 18,
11Canton Township, City of Washington,
12Project ID 88829

 

13Project Allocation

1,499,000

14(Base Project Allocation - $658,000)

 

15(Land Allocation - $601,000)

 

16(Design & Contingencies - $240,000)

 

17(11) SR 0136, Highway Portion Bridge
18Replacement, PA 136 over Little Branch
19of Chartiers Creek, North Strabane
20Township, Project ID 76055

 

21Project Allocation

676,000

22(Base Project Allocation - $401,000)

 

23(Land Allocation - $75,000)

 

24(Design & Contingencies - $200,000)

 

25(12) SR 0231, Highway Portion Bridge
26Replacement, PA 231 over Brush Run,
27Blaine and Independence Townships,
28Project ID 88078

 

29Project Allocation

670,000

30(Base Project Allocation - $670,000)

 

1(13) SR 1002, Intersection Improvement,
2SR 1019/SR 1002/Thompsonville Road
3Intersection, Peters Township, Project
4ID 97970

 

5Project Allocation

2,000,000

6(Base Project Allocation - $2,000,000)

 

7(14) SR 0019, Resurface, US 19 Highland
8Avenue to North Gate Mall Road, South
9Strabane Township, City of Washington,
10Project ID 94729

 

11Project Allocation

1,083,000

12(Base Project Allocation - $1,083,000)

 

13(15) SR 0019, Highway Reconstruction, PA
1419 Segments 0370 to 0421, South
15Strabane and North Strabane Townships,
16Project ID 87373

 

17Project Allocation

1,500,000

18(Base Project Allocation - $1,500,000)

 

19(16) SR 0070, Highway Portion Bridge
20Preservation, I-70 over PA 88, PA 906,
21Two Railroads and the Mon River,
22Speers Borough, Project ID 94684

 

23Project Allocation

801,000

24(Base Project Allocation - $590,000)

 

25(Design & Contingencies - $211,000)

 

26(17) SR 0019, Highway Reconstruction,
27Signals, Drainage and ADA Ramps, SR
280019 Lincoln Street and College
29Street, Ridge and Murtland Avenues,
30City of Washington, Project ID 90461

 

1Project Allocation

1,356,000

2(Base Project Allocation - $1,356,000)

 

3(18) I-70, Highway Reconstruction with
4Bridge Rehabilitation, I-70 Six Lane
5from I-79 North Junction to I-79 South
6Junction, South Strabane Township,
7Project ID 87236

 

8Project Allocation

8,414,000

9(Base Project Allocation - $7,300,000)

 

10(Land Allocation - $548,000)

 

11(Design & Contingencies - $566,000)

 

12(19) SR 0018, Highway Portion of Bridge
13Replacement, PA 18 over Chartiers
14Creek, North Franklin Township,
15Project ID 90685

 

16Project Allocation

1,330,000

17(Base Project Allocation - $1,330,000)

 

18(20) SR 0070, Highway Reconstruction,
19Concrete Pavement Rehabilitation, I-70
20from SR 0040 to Jefferson Avenue,
21Mileposts 15 to 18, South Strabane and
22Canton Townships, City of Washington,
23Project ID 31167

 

24Project Allocation

650,000

25(Base Project Allocation - $450,000)

 

26(Land Allocation - $100,000)

 

27(Design & Contingencies - $100,000)

 

28(21) SR 0040, Resurface, US 40 from PA
29917 to West Pike Run Township Line,
30Beallsville Borough, North Bethlehem

 

1and West Pike Run Townships, Project
2ID 98362

 

3Project Allocation

4,000,000

4(Base Project Allocation - $4,000,000)

 

5(22) SR 0980, Rehabilitation, Resurface,
6PA 980 from Adams Avenue to the
7Village of Venice, Canonsburg Borough,
8Cecil Township, Project ID 98370

 

9Project Allocation

4,148,000

10(Base Project Allocation - $4,148,000)

 

11(23) SR 0844, Resurface, PA 844 from SR
124061 to PA 331, Canton and Hopewell
13Townships, Project ID 98369

 

14Project Allocation

3,125,000

15(Base Project Allocation - $3,125,000)

 

16(24) SR 0018, Resurface, PA 18 from McJay
17Drive to Chestnut Avenue, North
18Franklin Township, City of Washington,
19Project ID 98368

 

20Project Allocation

1,300,000

21(Base Project Allocation - $1,300,000)

 

22(25) SR 0040, Rehabilitation, Resurface,
23US 40 from PA 221 to TR 545 (Jack
24Street), Buffalo, Canton and North
25Franklin Townships, Project ID 98367

 

26Project Allocation

2,940,000

27(Base Project Allocation - $2,940,000)

 

28(26) US 19, Resurface, Reconstruction, US
2940 to Ridge Avenue, South Strabane
30Township, City of Washington, Project

 

1ID 98366

 

2Project Allocation

360,000

3(Base Project Allocation - $360,000)

 

4(27) I-79, Reconstruction, I-79 from the
5Greene County Line to the Allegheny
6County Line, Various Municipalities,
7Project ID 0

 

8Project Allocation

96,200,000

9(Base Project Allocation -
10$96,200,000)

 

11(28) SR 0837, Rehabilitation, Resurface,
12PA 837 from Fisher Road to Vance
13Deicas Highway, Carroll Township,
14Donora Borough, Project ID 98354

 

15Project Allocation

1,613,000

16(Base Project Allocation - $1,613,000)

 

17(29) SR 1006, Resurface, SR 1006 from
18Washington Road to Church Hill Road,
19North Strabane, Nottingham and Peters
20Townships, Project ID 98353

 

21Project Allocation

7,537,000

22(Base Project Allocation - $7,537,000)

 

23(30) SR 0837, Resurface, PA 837 from
24Second Street to Bradford Drive,
25Carroll Township, Donora Borough,
26Project ID 98364

 

27Project Allocation

1,916,000

28(Base Project Allocation - $1,916,000)

 

29(31) US 40, Resurface, Reconstruction,
30Garber Road to PA 917, Amwell, North

 

1Bethlehem and South Strabane
2Townships, Project ID 98352

 

3Project Allocation

653,000

4(Base Project Allocation - $653,000)

 

5(32) PA 88, Gearing Road to Jason Drive,
6Resurface, Reconstruction, Gearing
7Road to Jason Drive, Finelyville
8Borough, Union Township, Project ID
998365

 

10Project Allocation

636,000

11(Base Project Allocation - $636,000)

 

12(33) SR 2014, Rehabilitation, Resurface,
13SR 2014 from Fourth Street to
14Fallowfield Avenue, Charleroi Borough,
15Fallowfield Township, Project ID 98376

 

16Project Allocation

1,530,000

17(Base Project Allocation - $1,530,000)

 

18(34) I-70, Reconstruction, I-70 from the
19West Virginia State Line to the
20Westmoreland County Line, Various
21Municipalities, Project ID 0

 

22Project Allocation

162,800,000

23(Base Project Allocation -
24$162,800,000)

 

25(35) SR 1009, Resurface, SR 1009 from
26Southpointe Boulevard to Washington
27Pike, Cecil Township, Project ID 98355

 

28Project Allocation

1,630,000

29(Base Project Allocation - $1,630,000)

 

30(36) SR 1006, Resurface, SR 1006 from

 

1Church Hill Road to Elrama Road,
2Fineyville Borough, Peters and Union
3Townships, Project ID 98356

 

4Project Allocation

4,651,000

5(Base Project Allocation - $4,651,000)

 

6(37) PA 136, Resurface, Reconstruction,
7Ivy Drive to Brownlee Road, North
8Strabane, Somerset and South Strabane
9Townships, Project ID 98357

 

10Project Allocation

1,044,000

11(Base Project Allocation - $1,044,000)

 

12(38) SR 0088, Rehabilitation, Resurface,
13PA 88 from Mill Street to Front
14Street, East Bethlehem Township,
15Project ID 98358

 

16Project Allocation

600,000

17(Base Project Allocation - $600,000)

 

18(39) SR 0050, Resurface, PA 50 from PA 18
19to SR 1001 (Reissing Road), Cecil and
20Mount Pleasant Townships, Project ID
2198359

 

22Project Allocation

6,694,000

23(Base Project Allocation - $6,694,000)

 

24(40) SR 0050, Rehabilitation, Resurface,
25PA 50 from PA 50 (Bridgeville Road) to
26SR 1001 (Reissing Road), Cecil
27Township, Project ID 98360

 

28Project Allocation

398,000

29(Base Project Allocation - $398,000)

 

30(41) SR 0040, Resurface, US 40, Old

 

1National Pike to Franklin Farms Road,
2McDonald, Canonsburg and Claysville
3Boroughs, Donegal, Buffalo, North
4Franklin, Canton and Cecil Townships,
5Project ID 102386

 

6Project Allocation

3,000,000

7(Base Project Allocation - $3,000,000)

 

8(42) SR 0980, Resurface, PA 980, Pike
9Street to Barr Street, McDonald,
10Canonsburg and Claysville Boroughs,
11Donegal, Buffalo, North Franklin,
12Canton and Cecil Townships, Project ID
13102386

 

14Project Allocation

3,200,000

15(Base Project Allocation - $3,200,000)

 

16(43) SR 2013, Rehabilitation, Resurface,
17SR 2013 from Lone Pine Road to
18Sundecker Road, North Bethlehem and
19West Bethlehem Townships, Project ID
2098474

 

21Project Allocation

2,000,000

22(Base Project Allocation - $2,000,000)

 

23(44) SR 0040, Resurface, US 40 from I-79
24to Tannehill Drive, Amwell and South
25Strabane Townships, Project ID 98351

 

26Project Allocation

1,718,000

27(Base Project Allocation - $1,718,000)

 

28(45) US 40, Resurface, Reconstruction,
29Spring Road to Lanebane, California,
30Centerville and West Brownsville

 

1Boroughs, Project ID 98361

 

2Project Allocation

930,000

3(Base Project Allocation - $930,000)

 

4(46) SR 0837, Resurface, PA 837 from PA
588 to Gun Club Road, New Eagle
6Borough, Union Township, Project ID
798350

 

8Project Allocation

3,816,000

9(Base Project Allocation - $3,816,000)

 

10(47) SR 4067, Rehabilitation, Resurface,
11SR 4067 (North Branch Road) from
12Robinson Highway to Branch Road,
13Robinson Township, Project ID 98468

 

14Project Allocation

653,000

15(Base Project Allocation - $653,000)

 

16(48) SR 0040, Resurface, US 40 from PA 18
17to I-79 Overpass, Amwell and South
18Strabane Townships, City of
19Washington, Project ID 98363

 

20Project Allocation

1,400,000

21(Base Project Allocation - $1,400,000)

 

22(49) SR 2023, Rehabilitation, Resurface,
23SR 2023 from Scenic Drive to Taylor
24Bogdan Road, Carroll, Fallowfield and
25West Pike Run Townships, Project ID
2698472

 

27Project Allocation

2,000,000

28(Base Project Allocation - $2,000,000)

 

29(50) SR 4014, Rehabilitation, Resurface,
30SR 4014 (State Line Road) from the

 

1West Virginia State Line to Meeneely
2Road, Jefferson Township, Project ID
398475

 

4Project Allocation

2,000,000

5(Base Project Allocation - $2,000,000)

 

6(51) SR 4001, Rehabilitation, Resurface,
7SR 4001 (Robinson Church Road) from
8Old Steubenville Road to Bigger Road,
9Robinson Township, Project ID 98476

 

10Project Allocation

1,643,000

11(Base Project Allocation - $1,643,000)

 

12(52) SR 3037, Rehabilitation, Resurface,
13SR 3037 (Ackley Creek Road) from Enon
14Church Road to Beham Ridge Road, West
15Finley Township, Project ID 98479

 

16Project Allocation

1,500,000

17(Base Project Allocation - $1,500,000)

 

18(53) SR 4018, Rehabilitation, Resurface,
19SR 4018 (Meadowcroft Road) from the
20West Virginia State Line to Avella
21Road, Cross Creek, Independence and
22Jefferson Townships, Project ID 98480

 

23Project Allocation

2,000,000

24(Base Project Allocation - $2,000,000)

 

25(54) SR 3029, Rehabilitation, Resurface,
26SR 3029 from Rocky Run Road to PA 221,
27East Finley, South Franklin and West
28Finley Townships, Project ID 98467

 

29Project Allocation

8,760,000

30(Base Project Allocation - $8,760,000)

 

1(55) SR 2022, Rehabilitation, Resurface,
2Resurface Gas Light Road (SR 2022)
3from Marianna Road to Martindale Road,
4Marianna Borough, West Bethlehem
5Township, Project ID 98484

 

6Project Allocation

1,000,000

7(Base Project Allocation - $1,000,000)

 

8(56) SR 4022, Rehabilitation, Resurface,
9SR 4022 (Pleasant Valley Road) from
10Greene Valley Road to Jefferson
11Avenue, Buffalo and Canton Townships
12and City of Washington, Project ID
1398485

 

14Project Allocation

1,500,000

15(Base Project Allocation - $1,500,000)

 

16(57) SR 3006, Rehabilitation, Resurface,
17SR 3006 (Newman Road) from Clays
18Taylor Ridge Road to Sunset Beach
19Road, Blaine and Buffalo Townships,
20Project ID 98486

 

21Project Allocation

1,628,000

22(Base Project Allocation - $1,628,000)

 

23(58) SR 4019, Rehabilitation, Resurface,
24SR 4019 (Pleasant Valley Road) from
25Cherry Valley Road to Midway Candor
26Road, Robinson and Smith Townships,
27Project ID 98471

 

28Project Allocation

1,000,000

29(Base Project Allocation - $1,000,000)

 

30(59) SR 4037, Rehabilitation, Resurface,

 

1(Fort Cherry Road) from Millers Run
2Road to Bridge over Robinson Run,
3Mount Pleasant and Robinson Townships,
4Project ID 98487

 

5Project Allocation

1,000,000

6(Base Project Allocation - $1,000,000)

 

7(60) SR 2003, Rehabilitation, Resurface,
8Chestnut Ridge Road (SR 2003) from
9Brush Run Road to the National Pike,
10Amwell Township, Project ID 98295

 

11Project Allocation

2,235,000

12(Base Project Allocation - $2,235,000)

 

13(61) SR 1087, Rehabilitation, Resurface,
14SR 1087 from Main Street to PA 88,
15Carroll, Nottingham and Union
16Townships, Project ID 98329

 

17Project Allocation

1,358,000

18(Base Project Allocation - $1,358,000)

 

19(62) SR 1041, Resurface, Reconstruction,
20US 19 to SR 1009, North Strabane and
21South Strabane Townships, Project ID
2298874

 

23Project Allocation

197,000

24(Base Project Allocation - $197,000)

 

25(63) SR 1023, Rehabilitation, Resurface,
26SR 1023 from Linder Road to Washington
27Road, North Strabane Township, Project
28ID 98316

 

29Project Allocation

2,145,000

30(Base Project Allocation - $2,145,000)

 

1(64) US 22, Restoration, TR 400 to
2Crossover Road, Hanover Township,
3Project ID 98313

 

4Project Allocation

390,000

5(Base Project Allocation - $390,000)

 

6(65) SR 4013, Rehabilitation, Resurface,
7SR 4013 (Valley Street) from PA 980 to
8Bordo Lane, McDonald Borough, Robinson
9Township, Project ID 98482

 

10Project Allocation

1,538,000

11(Base Project Allocation - $1,538,000)

 

12(66) SR 0019, Resurface, US 19 from US 40
13to East Avenue, South Strabane
14Township and City of Washington,
15Project ID 98346

 

16Project Allocation

1,400,000

17(Base Project Allocation - $1,400,000)

 

18(67) SR 0040, Rehabilitation, Resurface,
19US 40 from Varner Drive to PA 221,
20Buffalo Township, Claysville Borough,
21Donegal Township, Project ID 98347

 

22Project Allocation

3,578,000

23(Base Project Allocation - $3,578,000)

 

24(68) SR 3001 Rehabilitation, Resurface,
25SR 3001 (Lake Road) from National Pike
26to Mount Hope Road, Donegal and
27Independence Townships, Project ID
2898464

 

29Project Allocation

2,000,000

30(Base Project Allocation - $2,000,000)

 

1(69) SR 3003, Rehabilitation, Resurface,
2SR 3003 (Dry Ridge Road) from Liberty
3Road to Wellsburg Road, Donegal
4Township, Project ID 98459

 

5Project Allocation

2,000,000

6(Base Project Allocation - $2,000,000)

 

7(70) SR 0844, Rehabilitation, Resurface,
8PA 844 from PA 231 to Wellsburg Road,
9Canton, Hopewell and Independence
10Townships, West Middletown Borough,
11Project ID 98348

 

12Project Allocation

5,715,000

13(Base Project Allocation - $5,715,000)

 

14(71) PA 88, Resurface, Reconstruction,
15First Street to Sixth Street,
16Charleroi and North Charleroi
17Boroughs, Project ID 98345

 

18Project Allocation

158,000

19(Base Project Allocation - $158,000)

 

20(72) SR 2012, Rehabilitation, Resurface,
21SR 2012 from Coyle Curtain Road to
22Hickory Drive, Fallowfield Township,
23Project ID 98343

 

24Project Allocation

188,000

25(Base Project Allocation - $188,000)

 

26(73) SR 1002, Resurface, SR 1002 from SR
271009 to US 19, North Strabane and
28Peters Townships, Project ID 98344

 

29Project Allocation

1,416,000

30(Base Project Allocation - $1,416,000)

 

1(74) PA 837, Resurface, Reconstruction,
2Scott Street to Main Street, Carroll
3Township, Donora Borough, City of
4Monongahela, Project ID 98342

 

5Project Allocation

180,000

6(Base Project Allocation - $180,000)

 

7(75) SR 1033, Rehabilitation, Resurface,
8SR 1033 from PA 88 (Brownsville Road)
9to SR 3013, Union Township, Project ID
1098349

 

11Project Allocation

833,000

12(Base Project Allocation - $833,000)

 

13(76) SR 1003, Rehabilitation, Resurface,
14SR 1003 (Cecil Reissing Road) from
15Reissing Road to Reising Hollow Road,
16Cecil Township, Project ID 98466

 

17Project Allocation

255,000

18(Base Project Allocation - $255,000)

 

19Section 364. Wayne County.

20Projects are as follows:

 

21(1) (Reserved).

 

22(2) SR 0191, Slope Repair, SR 0191
23(Hancock Highway), Buckingham
24Township, Project ID 96818

 

25Project Allocation

892,000

26(Base Project Allocation - $662,000)

 

27(Design and Contingencies - $230,000)

 

28(3) SR 1023, Highway Portion Bridge
29Rehabilitation, SR 1023 (Pine Mill
30Road), Manchester Township, Starrucca

 

1Borough, Project ID 92892

 

2Project Allocation

2,824,000

3(Base Project Allocation - $1,878,000)

 

4(Land Allocation - $84,000)

 

5(Design and Contingencies - $862,000)

 

6(4) SR 4014, Highway Portion Bridge
7Replacement, SR 4014 over Balls Creek,
8Scott Township, Project ID 68975

 

9Project Allocation

2,051,000

10(Base Project Allocation - $1,309,000)

 

11(Land Allocation - $51,000)

 

12(Design and Contingencies - $691,000)

 

13(5) SR 0652, Slope Repair, SR 0652 (Beach
14Lake Road), Damascus Township, Project
15ID 96817

 

16Project Allocation

446,000

17(Base Project Allocation - $331,000)

 

18(Design and Contingencies - $115,000)

 

19(6) SR 0191 Various, Restoration, Surface
20Treatment, SR 0191 from Equinock Creek
21Bridge to Fish Commission Road, SR
223007 from SR 3003 to SR 0690, SR 2003
23from the Pike County Line to Rocky Run
24Road, Berlin, Buckingham, Palmyra,
25Preston, Salem, Sterling and Texas
26Townships, Project ID 91225

 

27Project Allocation

3,223,000

28(Base Project Allocation - $3,222,000)

 

29(Design & Contingencies - $1,000)

 

30(7) SR 3028, Slope Repair, SR 3028 (Owego

 

1Turnpike), Palmyra and Paupack
2Townships, Project ID 96821

 

3Project Allocation

268,000

4(Base Project Allocation - $199,000)

 

5(Design & Contingencies - $69,000)

 

6(8) SR 0191, Slope Repair, SR 0191
7(Hancock Highway), Buckingham and
8Manchester Townships, Project ID 96908

 

9Project Allocation

2,273,000

10(Base Project Allocation - $1,675,000)

 

11(Design & Contingencies - $598,000)

 

12(9) SR 1004, Slope Repair, SR 1004 (River
13Road), Damascus Township, Project ID
1496905

 

15Project Allocation

1,749,000

16(Base Project Allocation - $1,289,000)

 

17(Design & Contingencies - $460,000)

 

18(10) SR 4014, Slope Repair, SR 4014
19(Winterdale Road), Buckingham
20Township, Project ID 96881

 

21Project Allocation

535,000

22(Base Project Allocation - $397,000)

 

23(Design & Contingencies - $138,000)

 

24(11) SR 0370, Slope Repair, SR 0370
25(Crosstown Highway), Buckingham
26Township, Project ID 96904

 

27Project Allocation

179,000

28(Base Project Allocation - $133,000)

 

29(Design & Contingencies - $46,000)

 

30(12) SR 0006, Highway Surface Treatment,

 

1Various Locations, Canaan Township,
2Hawley and Honesdale Boroughs, Lake,
3Mount Pleasant, Palmyra, Preston,
4Salem and Texas Townships, Waymart
5Borough, Project ID 91226

 

6Project Allocation

6,631,000

7(Base Project Allocation - $6,630,000)

 

8(Design & Contingencies - $1,000)

 

9(13) SR 0380, Resurface, SR 0380, in the
10Corresponding Municipalities, Lehigh
11Township, Project ID 87791

 

12Project Allocation

700,000

13(Base Project Allocation - $600,000)

 

14(Design & Contingencies - $100,000)

 

15(14) SR 0006, Edgeline Rumble Strips,
16Various Municipalities along US 6,
17Canaan Township, Honesdale and
18Prompton Boroughs, Texas Township,
19Waymart Borough, Project ID 101991

 

20Project Allocation

1,960,000

21(Base Project Allocation - $1,960,000)

 

22(15) SR 0423, Restoration, Surface
23Treatment, SR 0423, in the
24Corresponding Municipalities,
25Damascus, Dreher, Lebanon and Preston
26Townships, Project ID 101979

 

27Project Allocation

1,681,000

28(Base Project Allocation - $1,680,000)

 

29(Design & Contingencies - $1,000)

 

30(16) SR 0590, Restoration, Surface

 

1Treatment, SR 0590 in the
2Corresponding Municipalities, Hawley
3Borough, Palmyra, Paupack and Salem
4Townships, Project ID 101997

 

5Project Allocation

6,601,000

6(Base Project Allocation - $6,600,000)

 

7(Design & Contingencies - $1,000)

 

8(17) I-84, Reconstruction, I-84 from the
9Lackawanna County Line to the Pike
10County Line, Various Municipalities,
11Project ID 0

 

12Project Allocation

25,200,000

13(Base Project Allocation -
14$25,200,000)

 

15(18) I-380, Reconstruction, I-380 from
16the Lackawanna County Line to the
17Monroe County Line, Various
18Municipalities, Project ID 0

 

19Project Allocation

1,000,000

20(Base Project Allocation - $1,000,000)

 

21(19) SR 0590, Highway Portion Bridge
22Replacement on SR 0590, Hamilin
23Highway over Branch of Ariel Creek, SR
240590 (Hamilin Highway), Salem
25Township, Project ID 101791

 

26Project Allocation

1,353,000

27(Base Project Allocation - $663,000)

 

28(Design & Contingencies - $690,000)

 

29(20) SR 0670, Highway Restoration, SR
300670, Segment 0010 to Segment 0310,

 

1Various Municipalities, Project ID
299520

 

3Project Allocation

1,667,000

4(Base Project Allocation - $1,666,000)

 

5(Design & Contingencies - $1,000)

 

6(21) SR 0590, Resurface, SR 0348 to SR
70006, Bethany and Honesdale Boroughs,
8Texas, Dyberry and Mount Pleasant
9Townships, Project ID 102391

 

10Project Allocation

4,409,000

11(Base Project Allocation - $4,409,000)

 

12(22) SR 4012, Various, Restoration,
13Surface Treatment, SR 4012 from SR
141004 to SR 4037, SR 4035 from SR 0370
15to SR 1005, SR 0652 from T-504 to the
16New York State Line, SR 0435 from the
17Monroe County Line to the Lackawanna
18County Line, SR 1007 from SR 1005 to
19T-508, SR 1025 from SR 0371 to SR
200191, Berlin and Damascus Townships,
21Honesdale Borough, Lehigh, Oregon and
22Preston Townships, Starrucca Borough,
23Project ID 102085

 

24Project Allocation

6,885,000

25(Base Project Allocation - $6,884,000)

 

26(Design & Contingencies - $1,000)

 

27(23) SR 0670, Resurface, SR 0191 to SR
280247, Bethany and Honesdale Boroughs,
29Texas, Dyberry and Mount Pleasant
30Townships, Project ID 102355

 

1Project Allocation

2,500,000

2(Base Project Allocation - $2,500,000)

 

3(24) SR 0371, Various, Restoration,
4Surface Treatment, SR 0371 from SR
54019 to SR 0191, SR 1010 from SR 1001
6to SR 1005, SR 1031 from SR 0371,
7Berlin, Damascus, Lebanon, Mount
8Pleasant and Oregon Townships, Project
9ID 102066

 

10Project Allocation

5,649,000

11(Base Project Allocation - $5,648,000)

 

12(Design & Contingencies - $1,000)

 

13(25) SR 3018, SR 4005, Restoration,
14Surface Treatment, SR 3018 from SR
153019 to SR 3028 and SR 4005 from SR
160006 to SR 0170, Canaan, Clinton,
17Dyberry, Lake, South Canaan and Texas
18Townships, Project ID 102054

 

19Project Allocation

5,845,000

20(Base Project Allocation - $5,845,000)

 

21(26) SR 1002, Various, Restoration,
22Surface Treatment, SR 1002 from SR
231001 to the New York State Line, SR
244033 from SR 4031 to T-571, SR 4014
25from SR 4037 to PA 191, Buckingham,
26Damascus, Mount Pleasant, Oregon,
27Preston, Salem and Scott Townships,
28Project ID 102089

 

29Project Allocation

7,961,000

30(Base Project Allocation - $7,960,000)

 

1(Design & Contingencies - $1,000)

 

2(27) SR 0006, Various, Restoration,
3Surface Treatment, SR 0006, SR 0296
4and SR 0690, SR 3011 and SR 0196 in
5the Corresponding Municipalities,
6Canaan and Dreher Townships, Hawley
7and Honesdale Boroughs, Lake, Palmyra,
8Salem and Texas Townships, Waymart
9Borough, Project ID 102010

 

10Project Allocation

6,381,000

11(Base Project Allocation - $6,380,000)

 

12(Design & Contingencies - $1,000)

 

13(28) SR 0006, Restoration, Surface
14Treatment, SR 0006, from SR 0191 to TR
15405, SR 0006 from TR 456 to SR 0191
16and SR 0006 from Prospect Street to
17Pike County Line, Canaan Township,
18Hawley and Honesdale Boroughs, Palmyra
19Township, Prompton Borough, Texas
20Township, Project ID 102071

 

21Project Allocation

6,289,000

22(Base Project Allocation - $6,288,000)

 

23(Design & Contingencies - $1,000)

 

24(29) SR 0371, Highway Portion Bridge
25Replacement over the Outlet of Laurel
26Creek, SR 0371 (Cochecton Turnpike),
27Damascus Township, Project ID 101118

 

28Project Allocation

1,145,000

29(Base Project Allocation - $454,000)

 

30(Design & Contingencies - $691,000)

 

1Section 365. Westmoreland County.

2Projects are as follows:

 

3(1) (Reserved).

 

4(2) SR 0030, Rehabilitation, Resurface,
5US 30 from the Allegheny County Line
6to Malts Lane, North Huntingdon
7Township, Project ID 97196

 

8Project Allocation

5,000,000

9(Base Project Allocation - $5,000,000)

 

10(3) SR 0981, Congestion and Safety
11Improvements, PA 0981 and Ligonier
12Street, Contained within Eight City
13Blocks, Latrobe Borough, Unity
14Township, Project ID 94952

 

15Project Allocation

741,000

16(Base Project Allocation - $600,000)

 

17(Land Allocation - $31,000)

 

18(Design and Contingencies - $110,000)

 

19(4) SR 0030, Highway Reconstruction, SR
200030 from Mount Laurel Drive to
21Theater Street, Unity Township,
22Project ID 87815

 

23Project Allocation

1,500,000

24(Base Project Allocation - $1,500,000)

 

25(5) SR 3026, Safety Improvements, PA
26130/US 119/SR 3026/SR 3030, City of
27Greensburg, Hempfield Township,
28Trafford Borough, Project ID 94893

 

29Project Allocation

1,362,000

30(Base Project Allocation - $1,000,000)

 

1(Land Allocation - $110,000)

 

2(Design & Contingencies - $252,000)

 

3(6) SR 4073, Highway Portion Bridge
4Replacement, SR 4073 over PA 56,
5Allegheny Township, Project ID 83686

 

6Project Allocation

115,000

7(Land Allocation - $24,000)

 

8(Design & Contingencies - $91,000)

 

9(7) SR 0066, Pavement Preservation, PA 66
10from Mamont Drive to PA 366,
11Washington Township, Project ID 94852

 

12Project Allocation

266,000

13(Base Project Allocation - $266,000)

 

14(8) SR 0356, Safety Improvements to
15Various Intersections Located along PA
16356 Corridor, Freeport Bridge to PA 56
17Wendells Crossroads, Allegheny
18Township, Project ID 96654

 

19Project Allocation

22,050,000

20(Base Project Allocation -
21$15,000,000)

 

22(Land Allocation - $2,500,000)

 

23(Design & Contingencies - $4,550,000)

 

24(9) SR 0981, Highway Portion Bridge
25Replacement, PA 981 over Boyer Run,
26Mount Pleasant Township, Project ID
2789036

 

28Project Allocation

176,000

29(Base Project Allocation - $176,000)

 

30(10) SR 2007, Highway Portion Bridge

 

1Replacement, SR 2007 over Boyer Run in
2Mount Pleasant Township, Westmoreland
3County, Mount Pleasant Township,
4Project ID 89041

 

5Project Allocation

339,000

6(Land Allocation - $97,000)

 

7(Design & Contingencies - $242,000)

 

8(11) SR 4081, Highway Portion Bridge
9Replacement, SR 4081 over Little
10Pucketa Creek, City of Lower Burrell,
11Project ID 90665

 

12Project Allocation

1,111,000

13(Base Project Allocation - $1,111,000)

 

14(12) SR 0119, Highway Reconstruction, PA
15119 Segments 0210 to 0251, Hempfield
16Township, Youngwood Borough, Project
17ID 87818

 

18Project Allocation

1,075,000

19(Base Project Allocation - $1,075,000)

 

20(13) SR 0030, Installation of ITS
21Equipment, US 30 Corridor, Various
22Municipalities, Project ID 93205

 

23Project Allocation

3,500,000

24(Base Project Allocation - $3,000,000)

 

25(Design & Contingencies - $500,000)

 

26(14) SR 0356, Truck Climbing Lane, PA 356
27from the Freeport Bridge to TR 781,
28Allegheny Township, Project ID 70100

 

29Project Allocation

4,291,000

30(Base Project Allocation – $361,000)

 

1(Land Allocation - $2,500,000)

 

2(Design & Contingencies - $1,430,000)

 

3(15) SR 0130, Widening and Realignment,
4Harrison City Export Road at the
5Intersection of SR 0130, Penn
6Township, Project ID 32118

 

7Project Allocation

754,000

8(Base Project Allocation - $502,000)

 

9(Land Allocation - $104,000)

 

10(Design & Contingencies - $148,000)

 

11(16) SR 0030, US 119 McClure Road
12Intersection in Upper Tyrone Township,
13Fayette County to Develop a Proposal
14for Projects that would Update and
15Modernize US 119 in this Area, SR 30,
16Hempfield Township, Irwin Borough,
17North Huntingdon Township, Project ID
1832040

 

19Project Allocation

1,081,000

20(Base Project Allocation - $20,000)

 

21(Design & Contingencies - $1,061,000)

 

22(17) SR 0030, Pavement Preservation, US
2330, Beatty Crossroads to Saint Vincent
24Drive, Unity Township, Project ID
2591083

 

26Project Allocation

665,000

27(Base Project Allocation - $665,000)

 

28(18) I-70, Interchange Improvement, PA
29201 Interchange, Rostraver Township,
30Project ID 88507

 

1Project Allocation

49,000,000

2(Base Project Allocation -
3$49,000,000)

 

4(19) I-70, Interchange Improvement,
5Arnold City Interchange, City of
6Arnold, Project ID 88508

 

7Project Allocation

51,666,000

8(Base Project Allocation -
9$51,666,000)

 

10(20) SR 7412, Highway Rehabilitation with
11Bridge Replacement, SR 7412 Segment
120709, Latrobe Borough, Project ID
1388290

 

14Project Allocation

600,000

15(Base Project Allocation - $600,000)

 

16(21) SR 0906, Slide Repairs, PA 906,
17Rostraver Township, Project ID 95288

 

18Project Allocation

750,000

19(Design & Contingencies - $750,000)

 

20(22) SR 0056, Highway Restoration, SR
210056 Segments 0270/0000 to 0310/0545
22Eastbound, Segments 0271/0000 to
230291/0730 Westbound, Vandergrift
24Borough, Project ID 93072

 

25Project Allocation

694,000

26(Base Project Allocation - $694,000)

 

27(23) SR 0070, Reconstruction, Madison
28Interchange to Hunker, Hempfield
29Township, New Stanton Borough, Project
30ID 91580

 

1Project Allocation

25,500,000

2(Base Project Allocation –
3$25,500,000)

 

4(24) SR 0066, Pavement Preservation, PA
566, Segments 0330/2990 to 0380/1830,
6Washington Township, Project ID 91032

 

7Project Allocation

390,000

8(Base Project Allocation - $390,000)

 

9(25) SR 0022, Installation of ITS
10Equipment, SR 0022 Corridor, Various
11Municipalities, Project ID 93204

 

12Project Allocation

3,900,000

13(Base Project Allocation - $3,500,000)

 

14(Design & Contingencies - $400,000)

 

15(26) SR 0981, Restoration, Safety and
16Capacity, T-888 (Airport Road) to T-
17950 (Arnold Palmer Drive), Segments
180550/1637 to 0590/3556, Unity
19Township, Project ID 47478

 

20Project Allocation

2,415,000

21(Base Project Allocation - $2,001,000)

 

22(Design & Contingencies - $414,000)

 

23(27) SR 0119, Highway Reconstruction, US
24119 from Fayette/Westmoreland County
25Line to Crossover Road, East
26Huntingdon Township, Project ID 91038

 

27Project Allocation

4,887,000

28(Base Project Allocation - $4,501,000)

 

29(Land Allocation - $160,000)

 

30(Design & Contingencies - $226,000)

 

1(28) SR 2012, Highway Portion Bridge
2Replacement, SR 2012 over Brinker Run,
3Mount Pleasant Township, Project ID
479404

 

5Project Allocation

68,000

6(Land Allocation - $11,000)

 

7(Design & Contingencies - $57,000)

 

8(29) SR 0130, Resurface, PA 130 from the
9Intersection with SR 3030 to the
10Intersection with SR 2017, City of
11Greensburg, Hempfield and Unity
12Townships, Project ID 98312

 

13Project Allocation

4,254,000

14(Base Project Allocation - $4,254,000)

 

15(30) SR 0981, Resurface, PA 981 from the
16Intersection with PA 130 North to
17Kennametal at US 30, Unity Township,
18Project ID 98315

 

19Project Allocation

3,498,000

20(Base Project Allocation - $3,498,000)

 

21(31) US 30, Resurface, Reconstruction,
22Coalpit Run to Main Street, Ligonier
23Borough, Ligonier Township, Project ID
2498319

 

25Project Allocation

347,000

26(Base Project Allocation - $347,000)

 

27(32) SR 0993, Resurface, PA 993 from the
28Intersection with SR 4014 to the
29Intersection with SR 4010, Irwin and
30Manor Boroughs, North Huntingdon

 

1Township, Project ID 98314

 

2Project Allocation

3,014,000

3(Base Project Allocation - $3,014,000)

 

4(33) SR 0780, Resurface, PA 780 from the
5Intersection with SR 4036 to the
6Intersection with PA 400, Upper
7Burrell and Washington Townships,
8Project ID 98310

 

9Project Allocation

2,886,000

10(Base Project Allocation - $2,886,000)

 

11(34) SR 0993, Rehabilitation, Resurface,
12PA 993 from PA 130 to Frog Road, North
13Huntingdon Township, Trafford Borough,
14Project ID 98332

 

15Project Allocation

3,098,000

16(Base Project Allocation - $3,098,000)

 

17(35) SR 0711, Resurface, PA 711 from
18Intersection with Church Camp Road to
19the New Florence Borough Line,
20Fairfield Township, New Florence
21Borough, Saint Clair Township, Project
22ID 98309

 

23Project Allocation

6,082,000

24(Base Project Allocation - $6,082,000)

 

25(36) SR 0982, Resurface, PA 982 from the
26Intersection with US 30 to the
27Intersection with SR 1020, Derry
28Township, Latrobe Borough, Unity
29Township, Project ID 98317

 

30Project Allocation

2,417,000

1(Base Project Allocation - $2,417,000)

 

2(37) SR 3105, Rehabilitation, Resurface,
3SR 3105 (Mount Pleasant Road) from the
4Fayette County Line to the
5Intersection with PA 819, East
6Huntingdon Township, Project ID 98311

 

7Project Allocation

728,000

8(Base Project Allocation - $728,000)

 

9(38) SR 0130, Rehabilitation, Resurface,
10PA 130 from Barclay Avenue to Main
11Street, City of Greensburg, Project ID
1298321

 

13Project Allocation

188,000

14(Base Project Allocation - $188,000)

 

15(39) Tollgate Hill Road, Resurface,
16Reconstruction, Tollgate Hill Road,
17City of Greensburg, Hempfield
18Township, Project ID 98323

 

19Project Allocation

165,000

20(Base Project Allocation - $165,000)

 

21(40) SR 0066, Resurface, PA 66 from the
22Intersection with Pittsburgh Street to
23the Intersection with 4 Lane at Amos,
24Hutchinson Turnpike, City of
25Greensburg, Hempfield Township,
26Project ID 98324

 

27Project Allocation

2,735,000

28(Base Project Allocation - $2,735,000)

 

29(41) SR 4087, Rehabilitation, Resurface,
30SR 4087 (Industrial Boulevard) from PA

 

1366 to Twelfth Street, City of Lower
2Burrell, City of New Kensington,
3Project ID 98327

 

4Project Allocation

1,815,000

5(Base Project Allocation - $1,815,000)

 

6(42) SR 0906, Rehabilitation, Resurface,
7PA 906 from Village of Webster to
8Allegheny County Line, Rostraver
9Township, Project ID 98328

 

10Project Allocation

3,240,000

11(Base Project Allocation - $3,240,000)

 

12(43) PA 981, Resurface, Reconstruction,
13Saxman Run to US 22, Derry Township,
14New Alexandria Borough, Project ID
1598331

 

16Project Allocation

978,000

17(Base Project Allocation - $978,000)

 

18(44) US 119, Resurface, Reconstruction,
19SR 3091 to Walnut Street, Hempfield
20Township, New Stanton and Youngwood
21Boroughs, Project ID 98334

 

22Project Allocation

462,000

23(Base Project Allocation - $462,000)

 

24(45) SR 4093, Rehabilitation, Resurface,
25SR 4093 (Leechburg Hill Road) from the
26Intersection with PA 56 to Leechburg
27Bridge, Allegheny Township, Project ID
2898335

 

29Project Allocation

630,000

30(Base Project Allocation - $630,000)

 

1(46) SR 3103, Rehabilitation, Resurface,
2SR 3103 (Hamilton Avenue) from Village
3of Carbon to PA 136, City of
4Greensburg, Project ID 98341

 

5Project Allocation

503,000

6(Base Project Allocation - $503,000)

 

7(47) SR 3093, Rehabilitation, Resurface,
8SR 3093 from PA 31 to I-70, East
9Huntingdon and Hempfield Townships,
10New Stanton Borough, Project ID 98340

 

11Project Allocation

4,478,000

12(Base Project Allocation - $4,478,000)

 

13(48) SR 0400, Rehabilitation, Resurface,
14PA 400 from the Intersection with
15Wilma Drive to End of Four-Lane near
16the Intersection PA 66, Washington
17Township, Project ID 98336

 

18Project Allocation

5,610,000

19(Base Project Allocation - $5,610,000)

 

20(49) Deicas Highway Resurfacing,
21Resurface, Reconstruction, Deicas
22Highway Resurfacing, Rostraver
23Township, Project ID 98339

 

24Project Allocation

189,000

25(Base Project Allocation - $189,000)

 

26(50) SR 0711, Rehabilitation, Resurface,
27PA 711 from US 30 to Wilpen Road,
28Fairfield Township, Ligonier Borough,
29Ligonier Township, Project ID 98337

 

30Project Allocation

4,778,000

1(Base Project Allocation - $4,778,000)

 

2(51) PA 906, Resurface, Reconstruction,
3Monessen to SR 3013, City of Monessen,
4Rostraver Township, Project ID 98330

 

5Project Allocation

867,000

6(Base Project Allocation - $867,000)

 

7(52) SR 4052, Rehabilitation, Resurface,
8SR 4052 from PA 356 to PA 66,
9Washington Township, Project ID 98871

 

10Project Allocation

683,000

11(Base Project Allocation - $683,000)

 

12(53) I-70, Reconstruction, I-70 from the
13Washington County Line to the
14Pennsylvania Turnpike, Various
15Municipalities, Project ID 0

 

16Project Allocation

67,000,000

17(Base Project Allocation -
18$67,000,000)

 

19(54) SR 0271, Rehabilitation, Resurface,
20PA 271 from Intersection with SR 0711
21to Cambria County Line, Fairfield and
22Ligonier Townships, Project ID 98458

 

23Project Allocation

1,000,000

24(Base Project Allocation - $1,000,000)

 

25(55) SR 3053, Rehabilitation, Resurface,
26SR 3053 from SR 3022 to SR 3047, North
27Huntingdon Township, Project ID 98441

 

28Project Allocation

323,000

29(Base Project Allocation - $323,000)

 

30(56) SR 4010, Rehabilitation, Resurface,

 

1SR 4010 (Race Street) from SR 4007
2(Fourth Street) to PA 993, Hempfield
3Township, City of Jeannette, Manor and
4Penn Boroughs, Penn Township, Project
5ID 98491

 

6Project Allocation

2,573,000

7(Base Project Allocation - $2,573,000)

 

8(57) SR 0136, Resurface, PA 136 from
9Intersection of US 30 to SR 3099,
10Greengate Road, City of Greensburg,
11Hempfield Township, Project ID 98298

 

12Project Allocation

1,000,000

13(Base Project Allocation – $1,000,000)

 

14(58) SR 0136, Resurface, PA 136 from
15Intersection with PA 201 to
16Intersection with Janice Street,
17Rostraver and South Huntingdon
18Townships, West Newton Borough,
19Project ID 98299

 

20Project Allocation

2,000,000

21(Base Project Allocation - $2,000,000)

 

22(59) SR 0051, Resurface, PA 51 Southbound
23and Northbound from PA 201, Rostraver
24Township, Project ID 98300

 

25Project Allocation

4,000,000

26(Base Project Allocation - $4,000,000)

 

27(60) SR 3003, Resurface, SR 3003 from
28Interchange with PA 201 to Interchange
29with PA 906, City of Monessen, Project
30ID 98302

 

1Project Allocation

1,853,000

2(Base Project Allocation - $1,853,000)

 

3(61) SR 3077, Rehabilitation, Resurface,
4SR 3077 (Edna Road) from PA 136 to
5Coal Street, Adamsburg Borough,
6Hempfield Township, Penn Borough,
7Project ID 98303

 

8Project Allocation

3,015,000

9(Base Project Allocation - $3,015,000)

 

10(62) SR 0286, Rehabilitation and
11Resurface, PA 286 from SR 0400 to SR
121042, Murrysville Borough, Washington
13Township, Project ID 98455

 

14Project Allocation

2,100,000

15(Base Project Allocation - $2,100,000)

 

16(63) SR 4087, Rehabilitation and
17Resurface, SR 4087 (Industrial
18Boulevard), Cities of Lower Burrell
19and New Kensington, Project ID 98872

 

20Project Allocation

1,815,000

21(Base Project Allocation - $1,815,000)

 

22(64) SR 0982, Rehabilitation and
23Resurface, PA 982 from Intersection
24with PA 130 to Intersection with US
2530, Unity Township, Youngstown
26Borough, Project ID 98456

 

27Project Allocation

2,000,000

28(Base Project Allocation - $2,000,000)

 

29(65) SR 4034, Rehabilitation and
30Resurface, SR 4034 from PA 356 to PA

 

166, Allegheny Township, Oklahoma
2Borough, Washington Township, Project
3ID 98870

 

4Project Allocation

1,695,000

5(Base Project Allocation - $1,695,000)

 

6(66) SR 3044, Bridge Replacement on SR
73044 over Little Sewickley Creek in
8Hempfield Township, SR 3044, Hempfield
9Township, Project ID 98865

 

10Project Allocation

303,000

11(Base Project Allocation - $303,000)

 

12(67) SR 0030, Congestion Improvements, US
1330, City of Jeanette, Hempfield
14Township, Project ID 101493

 

15Project Allocation

447,000

16(Base Project Allocation - $251,000)

 

17(Land Allocation - $46,000)

 

18(Design & Contingencies - $150,000)

 

19(68) SR 0066, Resurface, PA 66, Main
20Street to Old Route 66 Road, City of
21Greensburg, Ligonier Borough,
22Ligonier, Penn, Unity, Salem and
23Hempfield Townships, Project ID 101400

 

24Project Allocation

2,100,000

25(Base Project Allocation - $2,100,000)

 

26(69) SR 0030, Resurface, US 30, Two Mile
27Run Road to Loyalhanna, City of
28Greensburg, Ligonier Borough,
29Ligonier, Penn, Unity, Salem and
30Hempfield Townships, Project ID 101400

 

1Project Allocation

1,500,000

2(Base Project Allocation - $1,500,000)

 

3(70) SR 0030, Resurface, US 30, Crossover
4Road to Laughlintown Run, City of
5Greensburg, Ligonier Borough,
6Ligonier, Penn, Unity, Salem and
7Hempfield Townships, Project ID 101400

 

8Project Allocation

1,500,000

9(Base Project Allocation - $1,500,000)

 

10(71) SR 0119, Resurface, US 119, Dayok
11Farm Lane to Frogtown Road, City of
12Greensburg, Ligonier Borough,
13Ligonier, Penn, Unity, Salem and
14Hempfield Townships, Project ID 101400

 

15Project Allocation

1,250,000

16(Base Project Allocation - $1,250,000)

 

17(72) SR 0022, Concrete Patching, US 22
18from the Allegheny County Line to the
19Indiana County Line, Derry Township,
20Murrysville and New Alexandria
21Boroughs, Salem Township, Project ID
22101370

 

23Project Allocation

2,000,000

24(Base Project Allocation - $2,000,000)

 

25(73) SR 0119, Resurface, US 119, Otterman
26Street to Martin Road, City of
27Greensburg, Ligonier Borough and
28Ligonier, Penn, Unity, Salem and
29Hempfield Townships, Project ID 101400

 

30Project Allocation

1,250,000

1(Base Project Allocation - $1,250,000)

 

2(74) SR 0780, Resurface, PA 780 from
3Intersection with PA 56 to
4Intersection with SR 4036, Cities of
5Lower Burrell and New Kensington,
6Upper Burrell Townships, Project ID
798305

 

8Project Allocation

3,872,000

9(Base Project Allocation - $3,872,000)

 

10(75) PA 366, Resurface and
11Reconstruction, Gilmore to PA 66,
12Washington Township, Project ID 101813

 

13Project Allocation

425,000

14(Base Project Allocation - $425,000)

 

15(76) US 30, Resurface and Reconstruction,
16Georges to Beattyco, Hempfield and
17Unity Townships, Project ID 100322

 

18Project Allocation

1,920,000

19(Base Project Allocation - $1,920,000)

 

20(77) SR 0981, Resurface, PA 981, Avonmore
21Road to Main Street, Ligonier and New
22Florence Boroughs, Loyalhanna, Bell,
23Fairfield, Saint Clair, Donegal,
24Rostraver and Allegheny Townships,
25Project ID 102381

 

26Project Allocation

1,750,000

27(Base Project Allocation - $1,750,000)

 

28(78) SR 0711, Resurface, PA 711, Vine
29Street to Grant Street, Ligonier and
30New Florence Boroughs, Loyalhanna,

 

1Bell, Fairfield, Saint Clair, Donegal,
2Rostraver and Allegheny Townships,
3Project ID 102381

 

4Project Allocation

2,500,000

5(Base Project Allocation - $2,500,000)

 

6(79) SR 0711, Resurface, PA 711, Market
7Street to Shannon Run, Ligonier and
8New Florence Boroughs, Loyalhanna,
9Bell, Fairfield, Saint Clair, Donegal,
10Rostraver and Allegheny Townships,
11Project ID 102381

 

12Project Allocation

2,500,000

13(Base Project Allocation - $2,500,000)

 

14(80) SR 0031, Resurface, PA 31,
15Stahlstown Road to Camp Run Road,
16Ligonier and New Florence Boroughs,
17Loyalhanna, Bell, Fairfield, Saint
18Clair, Donegal, Rostraver and
19Allegheny Townships, Project ID 102381

 

20Project Allocation

1,300,000

21(Base Project Allocation - $1,300,000)

 

22(81) SR 0201, Resurface, PA 201, Ramp B
23Road to Pollock Run, Ligonier and New
24Florence Boroughs, Loyalhanna, Bell,
25Fairfield, Saint Clair, Donegal,
26Rostraver and Allegheny Townships,
27Project ID 102381

 

28Project Allocation

1,700,000

29(Base Project Allocation - $1,700,000)

 

30(82) SR 4105, Rehabilitation and

 

1Resurface, SR 4105 from PA 66 to PA
256, Allegheny Township, Oklahoma and
3Vandergift Boroughs, Washington
4Township, Project ID 98436

 

5Project Allocation

1,500,000

6(Base Project Allocation - $1,500,000)

 

7(83) SR 0217, Rehabilitation and
8Resurface, PA 217 from US 30 to SR
91041, Derry Borough, Derry and Unity
10Townships, Project ID 98437

 

11Project Allocation

1,500,000

12(Design & Contingencies - $1,500,000)

 

13(84) SR 3109, Rehabilitation and
14Resurface, SR 3109 (Fells Church Road)
15from PA 201 to PA 51, Rostraver
16Township, Project ID 98477

 

17Project Allocation

1,673,000

18(Base Project Allocation - $1,673,000)

 

19(85) SR 4016, Rehabilitation and
20Resurface, SR 4016 from PA 993 to TR
21430, Trafford Borough, Project ID
2298439

 

23Project Allocation

330,000

24(Base Project Allocation – $330,000)

 

25(86) SR 0400, Rehabilitation and
26Resurface, PA 400 from Intersection
27with PA 66 to SR 0286, Bell and
28Washington Townships, Project ID 98454

 

29Project Allocation

1,100,000

30(Base Project Allocation - $1,100,000)

 

1(87) SR 0366, Resurface, PA 366 from PA
2400 to Gilmore Road, Murrysville
3Borough, Upper Burrell and Washington
4Townships, Project ID 98449

 

5Project Allocation

4,500,000

6(Base Project Allocation - $4,500,000)

 

7(88) SR 0271, Highway Portion Bridge
8Preservation, PA 271 over Mill Creek,
9Ligonier Township, Project ID 98657

 

10Project Allocation

1,300,000

11(Base Project Allocation - $1,300,000)

 

12(89) SR 1046, Resurface and
13Reconstruction, US 30 in Ligonier,
14Ligonier Borough and Ligonier
15Township, Project ID 98443

 

16Project Allocation

207,000

17(Base Project Allocation - $207,000)

 

18(90) SR 3047, Resurface and
19Reconstruction, Bolton Lane to US 30,
20North Huntingdon Township, Project ID
2198444

 

22Project Allocation

460,000

23(Base Project Allocation - $460,000)

 

24(91) PA 981, Resurface and
25Reconstruction, SR 1035 to PA 286,
26Loyalhanna Township, Project ID 98445

 

27Project Allocation

200,000

28(Base Project Allocation - $200,000)

 

29(92) US 119, Resurface and
30Reconstruction, PA 66 to Otterman

 

1Street, City of Greensburg, Project ID
298447

 

3Project Allocation

69,000

4(Base Project Allocation - $69,000)

 

5(93) SR 0819, Rehabilitation and
6Resurface, PA 819 from SR 0981 to SR
70066, Bell and Washington Townships,
8Project ID 98453

 

9Project Allocation

1,000,000

10(Base Project Allocation - $1,000,000)

 

11(94) Lowery Avenue, Resurfacing,
12Resurface and Reconstruction, Lowery
13Avenue Resurfacing, City of Jeannette,
14Project ID 98442

 

15Project Allocation

200,000

16(Base Project Allocation - $200,000)

 

17(95) SR 0136, Rehabilitation and
18Resurface, PA 136 from Intersection
19with SR 3037, Arona Borough,
20Hempfield Township, Madison Borough
21Project ID 98451

 

22Project Allocation

1,500,000

23(Base Project Allocation - $1,500,000)

 

24(96) PA 982, Resurface and
25Reconstruction, SR 1018 to US 22 Derry
26Township, Project ID 98450

 

27Project Allocation

244,000

28(Base Project Allocation - $244,000)

 

29Section 366. Wyoming County.

30Projects are as follows:

 

1(1) (Reserved).

 

2(2) SR 0029, Intersection Safety
3Improvement, SR 0029 at Intersection
4of SR 3003 (Sugar Hollow Road), Eaton
5Township, Project ID 94688

 

6Project Allocation

350,000

7(Base Project Allocation - $184,000)

 

8(Land Allocation - $146,000)

 

9(Design and Contingencies - $20,000)

 

10(3) SR 0006, Slope Repair, SR 0006,
11Braintrim and Washington Townships,
12Project ID 96910

 

13Project Allocation

624,000

14(Base Project Allocation - $463,000)

 

15(Design and Contingencies - $161,000)

 

16(4) SR 0029, Slope Repair, SR 0029
17(Joseph W. Hunter Highway), Eaton
18Township, Project ID 97847

 

19Project Allocation

550,000

20(Base Project Allocation - $397,000)

 

21(Design and Contingencies - $153,000)

 

22(5) SR 1001, Highway Surface Treatment,
23Various Locations, Lemon and
24Tunkhannock Townships, Project ID
2591230

 

26Project Allocation

2,212,000

27(Base Project Allocation - $2,211,000)

 

28(Design and Contingencies - $1,000)

 

29(6) SR 0029, Restoration and Surface
30Treatment, SR 0029 and SR 0092 in

 

1Corresponding Municipalities, Lemon
2Township, Nicholson Borough,
3Nicholson, Noxen and Tunkhannock
4Townships, Project ID 91229

 

5Project Allocation

1,543,000

6(Base Project Allocation - $1,542,000)

 

7(Design and Contingencies - $1,000)

 

8(7) SR 0087, Slope Repair, SR 0087, North
9Branch Township, Project ID 96909

 

10Project Allocation

1,122,000

11(Base Project Allocation - $662,000)

 

12(Design and Contingencies - $460,000)

 

13(8) SR 0006, Highway Restoration, New
14Traffic Signals, Intersection
15Improvement, SR 0006 from Old Turnpike
16Road to Gravel Pond Road, Clinton
17Township, Factoryville Borough,
18Project ID 75718

 

19Project Allocation

3,428,000

20(Base Project Allocation - $3,428,000)

 

21(9) SR 0029, Slope Repair, SR 0029 (Lake
22Road/Joseph W. Hunter Highway), Noxen
23Township, Project ID 96688

 

24Project Allocation

811,000

25(Base Project Allocation - $397,000)

 

26(Design and Contingencies - $414,000)

 

27(10) SR 0087, Restoration, SR 0087 Slide,
28Mehoopany Township, Project ID 96683

 

29Project Allocation

513,000

30(Base Project Allocation - $232,000)

 

1(Design and Contingencies - $281,000)

 

2(11) SR 0011, Highway Portion Bridge
3Replacement, SR 0011 over Branch of
4Tunkhannock Creek, Clinton Township,
5Project ID 101154

 

6Project Allocation

1,082,000

7(Base Project Allocation - $391,000)

 

8(Design and Contingencies - $691,000)

 

9(12) SR 3001, Highway Portion Bridge
10Rehabilitation, SR 3001 over Kasson
11Brook, Forkston Township, Project ID
12101146

 

13Project Allocation

1,830,000

14(Base Project Allocation - $1,139,000)

 

15(Design and Contingencies - $691,000)

 

16(13) SR 0006 Various, Restoration and
17Surface Treatment, SR 0006, SR 0292,
18SR 2012, SR 2010 in Corresponding
19Municipalities, Braintrim, Clinton and
20Eaton Townships, Laceyville Borough,
21Monroe, Northmoreland and Overfield
22Townships, Project ID 101982

 

23Project Allocation

5,247,000

24(Base Project Allocation - $5,246,000)

 

25(Design and Contingencies - $1,000)

 

26(14) SR 0029, Resurface, SR 0415 to SR
273002 Market Street, Noxen Township,
28Project ID 102355

 

29Project Allocation

650,000

30(Base Project Allocation - $650,000)

 

1(15) SR 0087, Restoration and Surface
2Treatment, SR 0087 from SR 0187
3(Catlin Hollow Road) to SR 3001,
4Forkston and North Branch Townships,
5Project ID 101998

 

6Project Allocation

2,051,000

7(Base Project Allocation - $2,050,000)

 

8(Design and Contingencies - $1,000)

 

9Section 367. York County.

10Projects are as follows:

 

11(1) (Reserved).

 

12(2) SR 0372, Resurface, PA-372 from Slab
13Road to Susquehanna River Bridge,
14Lower Chanceford Township, Project ID
1596233

 

16Project Allocation

1,000,000

17(Base Project Allocation - $1,000,000)

 

18(3) I-83, Highway Reconstruction, I-83
19from SR 1007 Salem Road to Exit 39b PA
20Turnpike, Fairview Township, Project
21ID 92234

 

22Project Allocation

150,000

23(Base Project Allocation - $130,000)

 

24(Design & Contingencies - $20,000)

 

25(4) SR 2050, Highway Portion Bridge
26Replacement, SR 2050 (Century Farms
27Road) over Muddy Creek, Chanceford and
28East Hopewell Townships, Project ID
2991190

 

30Project Allocation

600,000

1(Base Project Allocation - $600,000)

 

2(5) SR 4001, Highway Reconstruction, SR
34001 (Bull Road) South of Stonehenge
4Drive to North of PA 238, West
5Manchester and Manchester Townships,
6Project ID 93172

 

7Project Allocation

308,000

8(Base Project Allocation - $165,000)

 

9(Land Allocation - $66,000)

 

10(Design & Contingencies - $77,000)

 

11(6) SR 2012, Highway Portion Bridge
12Replacement, SR 2012 (Bull Run Road)
13over Tributary of Beaver Creek, Lower
14Windsor Township, Project ID 81014

 

15Project Allocation

1,117,000

16(Base Project Allocation - $874,000)

 

17(Land Allocation - $20,000)

 

18(Design & Contingencies - $223,000)

 

19(7) SR 0425, Highway Portion Bridge
20Replacement, PA 425 (New Bridgeville
21Road) over Fishing Creek, Lower
22Windsor Township, Project ID 91191

 

23Project Allocation

601,000

24(Base Project Allocation - $601,000)

 

25(8) SR 0074, Intersection Improvement,
26Intersection of PA 74 (York Road) and
27Spring Lane Road, Carroll Township,
28Project ID 80694

 

29Project Allocation

577,000

30(Land Allocation - $227,000)

 

1(Design & Contingencies - $350,000)

 

2(9) SR 2069, Resurface, SR 2069 (Muddy
3Creeks Fork Road) from Fawn Township
4to Delta Road, Chanceford, Fawn and
5Lower Chanceford Townships, Project ID
696243

 

7Project Allocation

600,000

8(Base Project Allocation - $600,000)

 

9(10) SR 2009, Resurface, SR 2009 (Mount
10Pisgah Road) from PA 124 to SR 2011
11(Cool Creek Road), PA 624 from PA 24
12to Bicking Avenue, Hellam and Lower
13Windsor Townships, Red Lion Borough,
14Windsor Township, Yorkana Borough,
15Project ID 92918

 

16Project Allocation

2,485,000

17(Base Project Allocation - $2,455,000)

 

18(Land Allocation - $10,000)

 

19(Design & Contingencies - $20,000)

 

20(11) SR 3001, Resurface, PA 3001
21(Susquehanna Trail) from PA 851
22(Forrest Avenue) to PA 216 (Seaks Run
23Road), Shrewsbury Borough, Shrewsbury
24and Springfield Townships, Project ID
2596234

 

26Project Allocation

400,000

27(Base Project Allocation - $400,000)

 

28(12) SR 0024, Resurface, PA 24 (Cape Horn
29Road/North Main Street) from PA 124
30(East Prospect Road/Mount Rose Avenue)

 

1to PA 74 (Broadway Street), Red Lion
2Borough, Windsor and York Townships,
3Project ID 90913

 

4Project Allocation

548,000

5(Base Project Allocation - $522,000)

 

6(Design & Contingencies - $26,000)

 

7(13) SR 0238, Resurface, PA 238 from
8North George Street (PA-181) to
9Farmtrail Road, Manchester Township,
10Project ID 96232

 

11Project Allocation

250,000

12(Base Project Allocation - $250,000)

 

13(14) SR 0216, Resurface, PA 216 from SR
143033 (Manheim Road) to SR 3068
15(Grandview Road), Manheim, Penn and
16West Manheim Townships, Project ID
1796231

 

18Project Allocation

8,201,000

19(Base Project Allocation - $3,000,000)

 

20(Design & Contingencies - $5,201,000)

 

21(15) SR 0194, Resurface, PA 194
22(Baltimore Pike) from the Adams County
23Line to SR 4012 (Creek Road),
24Washington Township, Project ID 96230

 

25Project Allocation

3,023,000

26(Base Project Allocation - $2,997,000)

 

27(Design & Contingencies - $26,000)

 

28(16) SR 0030, Paving, US 30 (Arsenal
29Road) from Memory Lane to SR 1014
30Kruetz Creek Road, Hellam and

 

1Springettsbury Townships, Project ID
288327

 

3Project Allocation

772,000

4(Base Project Allocation - $521,000)

 

5(Land Allocation - $51,000)

 

6(Design & Contingencies - $200,000)

 

7(17) SR 0462, Intersection Improvements,
8PA 462 and Highland Avenue
9Intersection, West York Borough,
10Project ID 90029

 

11Project Allocation

332,000

12(Land Allocation - $101,000)

 

13(Design & Contingencies - $231,000)

 

14(18) SR 0851, Resurface, PA 851 (East
15Forrest Avenue/Bridgeview Road) from
16SR 3001 (Main Street) to Stewartstown
17Borough Line, Hopewell Township,
18Shrewsbury Borough, Shrewsbury
19Township, Stewartstown Borough,
20Project ID 91073

 

21Project Allocation

4,700,000

22(Base Project Allocation - $4,700,000)

 

23(19) SR 0074, Add Eastbound Turning Lane,
24Radius Improvements on Southeast and
25Southwest Corners, Signal Timing
26Improvements, Intersection of PA 74
27(South Queen Street) and SR 3054
28(Rathton Road), Spring Garden
29Township, City of York, Project ID
3095320

 

1Project Allocation

342,000

2(Base Project Allocation – $240,000)

 

3(Land Allocation - $42,000)

 

4(Design & Contingencies - $60,000)

 

5(20) SR 0015, Install 1/10th Mile Markers
6with Route Signs, US 15 from the
7Cumberland County Line to the Adams
8County Line, Carroll Township, and
9Dillsburg Borough, Franklin Township,
10Project ID 94745

 

11Project Allocation

51,000

12(Design & Contingencies - $51,000)

 

13(21) SR 0216, Resurface, PA 216 (Pleasant
14Grove Road) from Glen Rock Road (PA
15216) to Seak Run Road (PA 216),
16Springfield Township, Project ID 96235

 

17Project Allocation

50,000

18(Base Project Allocation - $50,000)

 

19(22) I-83, Highway Reconstruction with
20Bridge Rehabilitation, I-83 from PA
21214 Bridge to North of SR 3036
22Interchange, York and Springfield
23Townships, Project ID 92155

 

24Project Allocation

428,000

25(Base Project Allocation - $384,000)

 

26(Design & Contingencies - $44,000)

 

27(23) SR 0425, Widening, PA 425
28(Bridgeville Road) from Old State Road
29to Silverdale Avenue, Chanceford and
30Lower Windsor Townships, Project ID

 

193168

 

2Project Allocation

236,000

3(Base Project Allocation - $208,000)

 

4(Land Allocation - $10,000)

 

5(Design & Contingencies - $18,000)

 

6(24) SR 0083, Resurface, I-83 from PA 74
7to PA 181, Manchester Township, North
8York Borough, Spring Garden,
9Springettsbury and York Townships,
10Project ID 92118

 

11Project Allocation

13,334,000

12(Base Project Allocation -
13$12,212,000)

 

14(Land Allocation - $225,000)

 

15(Design & Contingencies - $897,000)

 

16(25) SR 3054, Intersection Improvements,
17Add Dual Left Turn Lanes on George
18Street, Intersection of SR 3054
19(Country Club Road/Rathton Road) and
20SR 3036 (George Street/Business 83
21Road), Spring Garden Township and City
22of York, Project ID 86887

 

23Project Allocation

780,000

24(Base Project Allocation - $328,000)

 

25(Land Allocation - $337,000)

 

26(Design & Contingencies - $115,000)

 

27(26) SR 0045, Install Roundabout, Safety
28Improvement, SR 3054, Intersection
29with York College Entrance, Spring
30Garden Township, Project ID 86889

 

1Project Allocation

393,000

2(Base Project Allocation - $393,000)

 

3(27) SR 0425, Widening, PA 425 from Old
4State Road to Silverdale Avenue, Lower
5Chanceford and Lower Windsor
6Townships, Project ID 93168

 

7Project Allocation

273,000

8(Base Project Allocation - $213,000)

 

9(Land Allocation - $22,000)

 

10(Design & Contingencies - $39,000)

 

11(28) SR 0024, Safety Improvement, PA 24
12from Concord Road to Whiteford Road,
13Springettsbury Township, Project ID
1493171

 

15Project Allocation

174,000

16(Base Project Allocation - $146,000)

 

17(Land Allocation - $2,000)

 

18(Design & Contingencies - $26,000)

 

19(29) I-83, Highway Reconstruction, I-83
20from PA 181 to PA 921, Manchester
21Township, Project ID 92154

 

22Project Allocation

295,000

23(Base Project Allocation - $275,000)

 

24(Design & Contingencies - $20,000)

 

25(30) SR 0083, Install ITS Equipment, I-83
26and US 30, Hellam, Manchester,
27Newberry, Shrewsbury, Springettsbury,
28Springfield and West Manchester
29Townships, City of York, York
30Township, Project ID 83618

 

1Project Allocation

301,000

2(Design & Contingencies - $301,000)

 

3(31) SR 4001, Highway Reconstruction, SR
44001 (Bull Road) South of Stonehenge
5Drive to North of PA 238, Manchester
6and West Manchester Townships, Project
7ID 93172

 

8Project Allocation

284,000

9(Base Project Allocation - $209,000)

 

10(Land Allocation - $27,000)

 

11(Design & Contingencies - $48,000)

 

12(32) SR 0015, Widen and New Signals, US
1315 from Range End Road/Golf Course
14Road to PA 74, Carroll Township,
15Dillsburg Borough, Franklin Township,
16Project ID 92923

 

17Project Allocation

75,000,000

18(Base Project Allocation -
19$75,000,000)

 

20(33) SR 0116, Resurface, PA 116 from
21Church Street to Hoke Street, Spring
22Grove Borough, Project ID 97967

 

23Project Allocation

150,000

24(Base Project Allocation - $150,000)

 

25(34) SR 2069, Resurface, SR 2069 (New
26Park Road) from PA 851 to South of
27Lower Chanceford Township Line, Fawn
28Township, Project ID 97968

 

29Project Allocation

620,000

30(Base Project Allocation - $620,000)

 

1(35) SR 0216, Highway Portion Bridge
2Replacement, PA 216 (Sticks Road) over
3Tributary of Pierceville Run, Codorus
4Township, Project ID 90321

 

5Project Allocation

1,891,000

6(Base Project Allocation - $1,891,000)

 

7(36) SR 0116, Mill, Base Repair and
8Overlay, PA 116 (Frederick Street/
9York Street/York Road) from Centennial
10Avenue to SR 3045 (Jacobs Mills Road),
11Hanover Borough, Heidelburg and Penn
12Townships, Project ID 87317

 

13Project Allocation

2,701,000

14(Base Project Allocation - $2,664,000)

 

15(Land Allocation - $16,000)

 

16(Design & Contingencies - $21,000)

 

17(37) SR 2003, Safety Improvement, I-83
18Exit 19 and SR 2003 (North Hills
19Road), Springettsbury Township,
20Project ID 93715

 

21Project Allocation

547,000

22(Base Project Allocation - $547,000)

 

23(38) SR 0462, Rehabilitation and
24Resurface, PA 462 (East Market Street)
25from SR 3025 (Harrison Street) to East
26of PA 24, Spring Garden and
27Springettsbury Townships, Project ID
2897974

 

29Project Allocation

304,000

30(Base Project Allocation - $304,000)

 

1(39) I-83, Highway Reconstruction, I-83
2from PA 921 to SR 1007 Salem Road,
3Conewago, East Manchester, Fairview,
4Manchester and Newberry Townships,
5Project ID 92230

 

6Project Allocation

670,000

7(Base Project Allocation - $650,000)

 

8(Design & Contingencies - $20,000)

 

9(40) SR 0083, Widen, I-83 from North of
10Exit 18 to PA 181 Interchange (Exit
1122), Manchester Township, North York
12Borough, Spring Garden and
13Springettsbury Townships, Project ID
1492924

 

15Project Allocation

37,802,000

16(Base Project Allocation -
17$37,802,000)

 

18(41) SR 0024, Safety Improvement, PA 24
19from Concord Road to Whiteford Road,
20Springettsbury Township, Project ID
2193171

 

22Project Allocation

201,000

23(Base Project Allocation - $143,000)

 

24(Land Allocation - $3,000)

 

25(Design & Contingencies - $55,000)

 

26(42) SR 0074, Resurface/Betterment, PA 74
27from I-83 to Windsor Township Line,
28Dallastown and Red Lion Boroughs and
29York Township, Project ID 90944

 

30Project Allocation

4,934,000

1(Base Project Allocation - $4,934,000)

 

2(43) SR 0425, Highway Portion Bridge
3Rehabilitation, PA 425 (Woodbine Road)
4over Muddy Creek, Lower Chanceford
5Township, Project ID 91071

 

6Project Allocation

2,200,000

7(Base Project Allocation - $2,200,000)

 

8(44) SR 0015, Local Road Access Closure,
9US 15 Intersection with Scotch Pine
10Road and Hickory Road, Franklin
11Township, Project ID 94948

 

12Project Allocation

165,000

13(Land Allocation - $90,000)

 

14(Design & Contingencies - $75,000)

 

15(45) SR 2002, Resurface, SR 2002
16(Springwood Road) from PA 74 (South
17Queen Street) to SR 2005 (Camp Betty
18Washington Road), York Township,
19Project ID 90926

 

20Project Allocation

1,200,000

21(Base Project Allocation - $1,200,000)

 

22(46) SR 3008, Resurface, SR 3008 (Church
23Street) from PA 216 (Main Street) to
24SR 3001 (Susquehanna Trail), Glen Rock
25Borough, Shrewsbury and Springfield
26Townships, Project ID 90930

 

27Project Allocation

1,500,000

28(Base Project Allocation - $1,500,000)

 

29(47) SR 0182, Resurface, PA 182 (Indian
30Rock Dam Road/Leader Heights Road)

 

1from PA 182 (Hokes Mill Road) to PA 74
2(South Queen Street), Spring Garden
3and York Townships, Project ID 90932

 

4Project Allocation

3,000,000

5(Base Project Allocation - $3,000,000)

 

6(48) SR 3046, Resurface, SR 3046 (New
7Salem Road/West College Avenue) from
8PA 616 (Trinity Road) to SR 3046 (Hoke
9Street), North Codorus and West
10Manchester Townships, Project ID 90933

 

11Project Allocation

1,470,000

12(Base Project Allocation - $1,470,000)

 

13(49) SR 0425, Resurface, PA 425 (Woodbine
14Road/North Market Street) from PA 851
15(Main Street) to PA 74 (Delta Road),
16Fawn Grove Borough, Fawn and Lower
17Chanceford Townships, Project ID 90936

 

18Project Allocation

4,075,000

19(Base Project Allocation - $4,075,000)

 

20(50) SR 3056, Resurface, SR 3056 (Tyler
21Run Road from PA 74 (South Queen
22Street) to Powder Mill Road, York
23Township, Project ID 90938

 

24Project Allocation

440,000

25(Base Project Allocation - $440,000)

 

26(51) SR 1012, Widen Existing Roadway,
27Emig Road under Norfolk Southern,
28Manchester Township, Project ID 61308

 

29Project Allocation

20,650,000

30(Base Project Allocation -

 

1$20,600,000)

 

2(Design & Contingencies - $50,000)

 

3(52) SR 4005, Resurface, SR 4005
4(Susquehanna Trail) from PA 238
5(Farmtrail Road/Church Road) to SR
64046 (Lightner Road), Manchester
7Township, Project ID 90940

 

8Project Allocation

968,000

9(Base Project Allocation - $968,000)

 

10(53) SR 0616, Highway Portion Bridge
11Replacement, PA 616 (Seven Valleys
12Road) over Centerville Creek, Codorus
13and Shrewsbury Townships, Project ID
1487551

 

15Project Allocation

125,000

16(Base Project Allocation - $125,000)

 

17(54) SR 0024, Resurface, PA 24 (Mount
18Zion Road) from Carol Avenue to
19Deininger Road, Springettsbury and
20Windsor Townships, Project ID 90946

 

21Project Allocation

3,900,000

22(Base Project Allocation - $3,900,000)

 

23(55) SR 3051, Highway Portion Bridge
24Replacement, SR 3051 (Park Road) over
25Codorus Creek, Manheim and North
26Codorus Townships, Project ID 87596

 

27Project Allocation

233,000

28(Base Project Allocation - $233,000)

 

29(56) SR 0094, Mill and Overlay, ADA, PA
3094 (Carlisle Street) from East Granger

 

1Street to SR 3098 (Elm Avenue) and SR
23098 (Elm Avenue) from the Adams
3County Line to PA 94 (Carlisle
4Street), Hanover Borough, Project ID
590947

 

6Project Allocation

1,627,000

7(Base Project Allocation - $1,601,000)

 

8(Design & Contingencies - $26,000)

 

9(57) SR 4012, Resurface/Betterment, SR
104012 (Creek Road) from PA 194
11(Baltimore Pike) to Doe Run Road,
12Washington Township, Project ID 90948

 

13Project Allocation

857,000

14(Base Project Allocation - $857,000)

 

15(58) SR 0094, Resurface/Betterment, PA 94
16(Carlisle Street) from Kuhn Drive to
17PA 116 (Fredrick Street), Hanover
18Borough, Project ID 90950

 

19Project Allocation

1,200,000

20(Base Project Allocation - $1,200,000)

 

21(59) SR 0015, Upgrade Signal System, US
2215 (Blue-Gray Highway) Corridor,
23Carroll Township and Dillsburg
24Borough, Project ID 94942

 

25Project Allocation

171,000

26(Base Project Allocation - $171,000)

 

27(60) SR 0216, Highway Portion Bridge
28Replacement, PA 216 over Seaks Run,
29Springfield Township, Project ID 91354

 

30Project Allocation

921,000

1(Base Project Allocation - $921,000)

 

2(61) SR 0083, Realignment, I-83 Exit 4,
3Hopewell and Shrewsbury Townships,
4Project ID 97197

 

5Project Allocation

8,200,000

6(Base Project Allocation - $8,200,000)

 

7(62) SR 0015, Improve Intersection, US 15
8(Blue-Gray Highway) and County Line
9Road, Franklin Township, Project ID
1094943

 

11Project Allocation

311,000

12(Base Project Allocation - $130,000)

 

13(Land Allocation - $21,000)

 

14(Design & Contingencies - $160,000)

 

15(63) SR 2079, Highway Portion Bridge
16Replacement, SR 2079 (Red Lion Avenue)
17over Muddy Creek North Branch, Felton
18Borough, Project ID 91036

 

19Project Allocation

2,600,000

20(Base Project Allocation - $2,600,000)

 

21(64) SR 0114, Resurface, PA 114
22(Lewisbury Road) from PA 382 to SR
231001 (Poplar Road), Fairview Township,
24Project ID 91070

 

25Project Allocation

2,500,000

26(Base Project Allocation - $2,500,000)

 

27(65) SR 3071, Highway Portion Bridge
28Replacement, SR 3071 (Impounding Dam
29Road) over South Branch of Conewago
30Creek, West Manheim Township, Project

 

1ID 87595

 

2Project Allocation

120,000

3(Base Project Allocation - $120,000)

 

4(66) SR 0015, Remove Cross Traffic
5Patterns, US 15 from Range End
6Road/Golf Course Road to PA 94
7(Carlisle Pike), Franklin and Carroll
8Townships, Project ID 92920

 

9Project Allocation

4,000,000

10(Base Project Allocation - $4,000,000)

 

11(67) SR 0462, Resurface, PA 462 (West
12Market Street) Hoffman Lane to PA 74
13(Carlisle Avenue), West Manchester
14Township, West York Borough, City of
15York, Project ID 91069

 

16Project Allocation

231,000

17(Base Project Allocation - $114,000)

 

18(Land Allocation - $41,000)

 

19(Design & Contingencies - $76,000)

 

20(68) SR 0462, Highway Portion Bridge
21Replacement, PA 462 (Lincoln Highway)
22over Tributary of Kruetz Creek, Hellam
23Township, Project ID 91046

 

24Project Allocation

438,000

25(Base Project Allocation - $204,000)

 

26(Land Allocation - $30,000)

 

27(Design & Contingencies - $204,000)

 

28(69) SR 1003, Resurface, SR 1003 (Old
29York Road) from the Cumberland County
30Line to PA 262 (Old York Road),

 

1Fairview Township, Project ID 90915

 

2Project Allocation

1,686,000

3(Base Project Allocation - $1,686,000)

 

4(70) SR 0194, Highway Portion Bridge
5Replacement, PA 194 (Baltimore Pike)
6over Mud Run, Washington Township,
7Project ID 87494

 

8Project Allocation

707,000

9(Base Project Allocation - $614,000)

 

10(Land Allocation - $5,000)

 

11(Design & Contingencies - $88,000)

 

12(71) SR 2046, Highway Portion Bridge
13Replacement, SR 2046 (High Rock Road)
14over North Branch of Muddy Creek, East
15Hopewell and Lower Chanceford
16Townships, Project ID 87498

 

17Project Allocation

248,000

18(Base Project Allocation - $199,00)

 

19(Land Allocation - $3,000)

 

20(Design & Contingencies - $46,000)

 

21(72) SR 0015, Resurface, Golf Course
22Road/Range Road to the Adams County
23Line, Carroll and Franklin Townships,
24Project ID 94950

 

25Project Allocation

1,900,000

26(Base Project Allocation - $1,900,000)

 

27(73) SR 0382, Resurface, SR 0382 and SR
280114 (Lewisberry Road) from 0.75 West
29of Intersection with SR 0382/SR 0177
30on SR 0382 to just North of SR 0382/SR

 

10114 Intersection on SR 0114, Fairview
2Township, Project ID 90921

 

3Project Allocation

586,000

4(Base Project Allocation - $560,000)

 

5(Design & Contingencies - $26,000)

 

6(74) SR 0392, Resurface, PA 392
7(Yocumtown Road) from Park-N-Ride by
8I-83 to PA 262 (Valley Road), Newberry
9Township, Project ID 88998

 

10Project Allocation

297,000

11(Base Project Allocation - $156,000)

 

12(Land Allocation - $40,000)

 

13(Design & Contingencies - $101,000)

 

14(75) SR 0074, Resurface, PA 74 (Delta
15Road) from SR 2037 (New Bridgeville
16Road) to East McKinley Road,
17Chanceford and Lower Chanceford
18Townships, Project ID 90922

 

19Project Allocation

6,300,000

20(Base Project Allocation - $6,300,000)

 

21(76) SR 0194, Highway Portion Bridge
22Replacement, PA 194 (Baltimore Pike)
23over Tributary of Bermudian Creek,
24Washington Township, Project ID 87519

 

25Project Allocation

241,000

26(Base Project Allocation - $241,000)

 

27(77) SR 2023, Resurface, SR 3023
28(Hollywood Drive/Hill Street) from PA
29124 (Mount Rose Avenue) to PA 74
30(South Queen Street), Spring Garden

 

1and York Townships, Project ID 90923

 

2Project Allocation

900,000

3(Base Project Allocation - $900,000)

 

4(78) SR 0124, Highway Portion Bridge
5Replacement, PA 124 (Abel Road) over
6Cabin Creek, Lower Windsor Township,
7Project ID 87693

 

8Project Allocation

904,000

9(Base Project Allocation - $904,000)

 

10(79) SR 0392, Highway Portion Bridge
11Replacement, PA 392 (Old Trail Road)
12over Fishing Creek, Newberry Township,
13Project ID 87692

 

14Project Allocation

120,000

15(Base Project Allocation - $120,000)

 

16(80) SR 0194, Highway Portion Bridge
17Replacement, PA 194 over Tributary of
18Bermudian Creek, Franklin Township,
19Project ID 87598

 

20Project Allocation

172,000

21(Base Project Allocation - $172,000)

 

22(81) SR 0030, Highway Restoration, US 30
23from US 30 over Willis Run to PA 181,
24Manchester and West Manchester
25Townships, City of York, Project ID
2688951

 

27Project Allocation

450,000

28(Base Project Allocation - $200,000)

 

29(Land Allocation - $50,000)

 

30(Design & Contingencies - $200,000)

 

1(82) SR 0216, Highway Portion Bridge
2Replacement, PA 216 (Blooming Grove
3Road) over Codorus Creek, Codorus and
4Manheim Townships, Project ID 88968

 

5Project Allocation

585,000

6(Base Project Allocation - $492,000)

 

7(Land Allocation - $6,000)

 

8(Design & Contingencies - $87,000)

 

9(83) SR 0234, Resurface, PA 234 (East
10Berlin Road) from SR 4051 (Big Mount
11Road) to PA 462 (Market Street),
12Dover, Jackson, Paradise and West
13Manchester Townships, Project ID 90917

 

14Project Allocation

714,000

15(Base Project Allocation - $573,000)

 

16(Land Allocation - $41,000)

 

17(Design & Contingencies - $100,000)

 

18(84) SR 0030, Safety Improvement, US 30
19from Kenneth Road to SR 2003 (North
20Hills Road) Manchester, Springettsbury
21and West Manchester Townships, City of
22City, Project ID 98286

 

23Project Allocation

951,000

24(Base Project Allocation - $750,000)

 

25(Design & Contingencies - $201,000)

 

26(85) SR 3072, Resurface, SR 3072
27(Moulstown Road) from SR 3047 (Iron
28Ridge Road) to East of Younge Road,
29Heidelberg and Penn Townships, Project
30ID 99960

 

1Project Allocation

1,600,000

2(Base Project Allocation - $1,600,000)

 

3(86) I-83, Highway Reconstruction, I-83
4from the Maryland State Line to the
5Cumberland County Line, Various
6Municipalities, Project ID 0

 

7Project Allocation

158,200,000

8(Base Project Allocation -
9$158,200,000)

 

10(87) SR 0083, Pipe Replacement, I-83 from
11Mason Dixon Line to PA 851 (Forrest
12Avenue) Shrewsbury Township, Project
13ID 102365

 

14Project Allocation

1,500,000

15(Base Project Allocation - $1,500,000)

 

16(88) SR 0083, Resurface, I-83 from Mason
17Dixon Line to PA 851, Shrewsbury
18Township, Project ID 102340

 

19Project Allocation

2,850,000

20(Base Project Allocation - $2,800,000)

 

21(Design & Contingencies - $50,000)

 

22(89) SR 0030, Passing Lanes, US 30 from
23SR 0116 (Salem Church Road) to the
24Adams County Line, Jackson, Paradise
25and West Manchester Townships, Project
26ID 100239

 

27Project Allocation

400,000

28(Base Project Allocation - $400,000)

 

29(90) SR 0921, New Interchange, Interchange
30on I-83 at SR 0921 (Canal Road), East

 

1Manchester Township, Project ID 100235

 

2Project Allocation

600,000

3(Base Project Allocation - $600,000)

 

4(91) SR 0616, Safety Improvements, SR
50616 (Seven Valleys Road), SR 3041
6(Green Valley Road) and SR 0214 (Main
7Street), North Codorus Township,
8Project ID 100232

 

9Project Allocation

1,200,000

10(Base Project Allocation - $1,200,000)

 

11(92) SR 0851, Resurface, SR 0851 (Main
12Street/Second Street) from SR 3001
13(North Main Street) to SR 3004
14(Hilderbrand Road), New Freedom,
15Railroad and Shrewsbury Boroughs,
16Shrewsbury Township, Project ID 100228

 

17Project Allocation

2,000,000

18(Base Project Allocation - $2,000,000)

 

19(93) SR 0030, Resurface, US 30 from
20Meadow Lane Road to Rambler Road,
21Jackson and Paradise Townships,
22Project ID 100227

 

23Project Allocation

2,000,000

24(Base Project Allocation - $2,000,000)

 

25(94) SR 0024, Resurface, PA 24
26(Winterstown Road) from SR 2079 (Cross
27Roads Avenue) to SR 2085 (Franklin
28Street Extension), North Hopewell
29Township, Winterstown Borough, Project
30ID 100224

 

1Project Allocation

2,400,000

2(Base Project Allocation - $2,400,000)

 

3(95) SR 0024, Resurface, PA 24 from SR
41033 (Sherman Street) to PA 921, East
5Manchester Township, Mount Wolf
6Borough, Springettsbury Township,
7Project ID 100220

 

8Project Allocation

2,400,000

9(Base Project Allocation - $2,400,000)

 

10(96) SR 3001, Resurface, SR 3001
11(Susquehanna Trail) from the Maryland
12Line to Shrewsbury Township/Borough
13Line, Shrewsbury Borough, Shrewsbury
14Township, Project ID 100219

 

15Project Allocation

3,000,000

16(Base Project Allocation - $3,000,000)

 

17(97) SR 2024, Highway Portion Bridge
18Preservation, SR 2024 (Paper Mill
19Road) over North Branch of Muddy
20Creek, Lower Chanceford and Peach
21Bottom Townships, Project ID 100161

 

22Project Allocation

340,000

23(Base Project Allocation - $340,000)

 

24(98) SR 0216, Resurface, PA 216 from PA
25516 (Jefferson Road) to SR 3013
26(Pierceville Road), Codorus Township,
27Project ID 99930

 

28Project Allocation

500,000

29(Base Project Allocation - $500,000)

 

30(99) SR 4014, Resurface, SR 4014 (Harmony

 

1Grove Road) from Conewago Road to PA
274 (Carlisle Road), Dover Township,
3Project ID 100010

 

4Project Allocation

1,900,000

5(Base Project Allocation - $1,900,000)

 

6(100) SR 0074, Safety Improvements, PA 74
7from SR 2071 (Good Road) to PA 921
8(Canal Street), Dover Borough, Dover
9and West Manchester Townships, City of
10York, Project ID 99326

 

11Project Allocation

1,000,000

12(Base Project Allocation - $1,000,000)

 

13(101) SR 3044, Resurface, SR 3044 (Indian
14Rock Dam Road) from PA 182 to SR 3042
15(Days Mill Road), North Codorus and
16West Manchester Townships, Project ID
1799958

 

18Project Allocation

1,500,000

19(Base Project Allocation - $1,500,000)

 

20(102) SR 3017, Resurface, SR 3017
21(Reynolds Mill Road), PA 214 to SR
223001 (George Street), Springfield and
23York Townships, Project ID 99955

 

24Project Allocation

2,100,000

25(Base Project Allocation - $2,100,000)

 

26(103) SR 2074, Resurface, SR 2074 (Plank
27Road) from SR 3001 (Main Street) to PA
2824, Hopewell Township, Shrewsbury
29Borough, Shrewsbury Township, Project
30ID 99953

 

1Project Allocation

2,900,000

2(Base Project Allocation - $2,900,000)

 

3(104) SR 2064, Resurface, SR 2064
4(Country Club Road) from PA 74 to PA
524, Red Lion Borough, York Township,
6Project ID 99949

 

7Project Allocation

850,000

8(Base Project Allocation - $850,000)

 

9(105) SR 1005, Resurface, SR 1005 (Marsh
10Run Road) from SR 1003 (Old York Road)
11to Mifflin Avenue, Fairview Township,
12Project ID 99948

 

13Project Allocation

900,000

14(Base Project Allocation - $900,000)

 

15(106) SR 0851, Resurface, PA 851
16(Gracetown Road/Main Street) from SR
172055 (Rocks Road) to SR 2080
18(Gracetown Road), Fawn Grove Borough,
19Fawn Township, Project ID 99946

 

20Project Allocation

900,000

21(Base Project Allocation - $900,000)

 

22(107) SR 0516 Resurface, PA 516
23(Jefferson Road) from PA 116 to
24Jefferson Borough Line, Jefferson
25Borough, North Codorus Township,
26Project ID 99944

 

27Project Allocation

1,500,000

28(Base Project Allocation - $1,500,000)

 

29(108) SR 0462, Resurface, PA 462 (Lincoln
30Highway) from SR 1014 (Freysville

 

1Road) to Howard Avenue, Hellam
2Borough, and Hellam Township,
3Wrightsville Borough, Project ID 99941

 

4Project Allocation

3,000,000

5(Base Project Allocation - $3,000,000)

 

6(109) SR 4045, Resurface, SR 4045
7(Campground Road) from SR 4040
8(Mountain Road) to PA 74, Carroll
9Township, Project ID 99940

 

10Project Allocation

1,100,000

11(Base Project Allocation - $1,100,000)

 

12(110) SR 4027, Resurface, SR 4027
13(Spangler's Mill Road) from PA 114 to
14Lower Allen Township Line, Fairview
15Township, Project ID 99937

 

16Project Allocation

650,000

17(Base Project Allocation - $650,000)

 

18(111) SR 4025, Resurface, SR 4025 (Old
19Stage Road) from PA 114 to SR 4020
20(Old Forge Road), Fairview Township,
21Project ID 99932

 

22Project Allocation

750,000

23(Base Project Allocation - $750,000)

 

24(112) I-83, SR 0851 and Various,
25Congestion and Safety Improvements, I-
2683 Exit 4, SR 0851 and other State
27Routes in Vicinity, Hopewell Township,
28Project ID 0

 

29Project Allocation

1,000,000

30(Base Project Allocation - $1,000,000)

 

1(113) SR 4020, Resurface, SR 4020 (Old
2Forge Road) from PA 114 to the
3Cumberland County Line, Fairview
4Township, Project ID 99931

 

5Project Allocation

1,500,000

6(Base Project Allocation - $1,500,000)

 

7(114) SR 0216, Resurface, PA 216 from SR
83033 (Manheim Road) to PA 516
9(Jefferson Road) Codorus and Manheim
10Townships, Project ID 100099

 

11Project Allocation

2,100,000

12(Base Project Allocation - $2,100,000)

 

13CHAPTER 5

14(RESERVED)

15CHAPTER 7

16MISCELLANEOUS PROVISIONS

17Section 701. Debt authorization.

18The Governor, Auditor General and State Treasurer are hereby
19authorized and directed to borrow from time to time, in addition
20to any authorization heretofore or hereafter enacted, on the
21credit of the Commonwealth, subject to the limitations provided
22in the current capital budget, money not exceeding in the
23aggregate the sum of $18,155,693,000 as may be found necessary
24to carry out the acquisition and construction of the State
25projects specifically itemized in this act.

26Section 702. Issue of bonds.

27The indebtedness authorized in this act shall be incurred
28from time to time and shall be evidenced by one or more series
29of general obligation bonds of the Commonwealth in such
30aggregate principal amount for each series as the Governor,

1Auditor General and State Treasurer shall determine, but the
2latest stated maturity date shall not exceed 30 years from the
3date of the bond first issued for each series.

4Section 703. Estimated useful life of projects.

5The General Assembly states the estimated useful life of the
6projects itemized in this act as 30 years.

7Section 704. Appropriation.

8The net proceeds of the sale of the obligations authorized in
9this act are hereby appropriated from the Capital Facilities
10Fund to the Department of Transportation in the maximum amount
11of $18,155,693,000 to be used by it exclusively to defray the
12financial costs of the State projects specifically itemized in
13this capital budget. After reserving or paying the expenses of
14the sale of the obligation, the State Treasurer shall pay out to
15the Department of Transportation the moneys as required and
16certified by it to be legally due and payable.

17Section 705. Federal funds.

18In addition to those funds appropriated in Chapter 3, all
19moneys received from the Federal Government for the projects
20specifically itemized in this act are also hereby appropriated
21for those projects.

22Section 706. Allocation of funds.

23Whenever as determined by the Department of Transportation
24that the full estimated financial costs of the projects itemized
25in this act are not necessary for the proper design, acquisition
26or construction of such projects, the excess funds no longer
27required may be allocated by the Department of Transportation to
28increase the estimated costs of any one or more of the projects
29specifically itemized in a capital budget.

30Section 707. Editorial changes.

1In editing and preparing this act for printing following the
2final enactment, the Legislative Reference Bureau shall insert
3or revise letters or numbers for projects where the letters or
4numbers are missing or require revision. The bureau shall also
5revise the total monetary amounts for the total authorization,
6debt authorization, appropriations and departmental totals as
7necessary to agree with the total monetary amounts of the
8projects.

9Section 708. Effective date.

10This act shall take effect immediately.