AN ACT

 

1Providing for the capital budget for the fiscal year <-2012-2013
<-22013-2014; itemizing public improvement projects, furniture
3and equipment projects, transportation assistance projects,
4redevelopment assistance capital projects, flood control
5projects, Keystone Recreation, Park and Conservation Fund
6projects, State forestry bridge projects, State
7ATV/Snowmobile Fund projects, Pennsylvania Fish and Boat 
8Commission projects, Manufacturing Fund projects, Oil and Gas 
9Lease Fund projects <-and, Environmental Stewardship Fund 
10projects <-and, highway bridge projects and State Stores Fund 
11current revenue projects to be constructed or acquired or
12assisted by the Department of General Services, the
13Department of Community and Economic Development, the
14Department of Conservation and Natural Resources, the
15Department of Environmental Protection, the Department of
16Transportation or the Pennsylvania Fish and Boat Commission,
17together with their estimated financial costs; authorizing
18the incurring of debt without the approval of the electors
19for the purpose of financing the projects to be constructed,
20acquired or assisted by the Department of General Services,
21the Department of Community and Economic Development, the
22Department of Conservation and Natural Resources, the
23Department of Environmental Protection, the Department of
24Transportation or the Pennsylvania Fish and Boat Commission;
25stating the estimated useful life of the projects; and making
26appropriations.

27The General Assembly of the Commonwealth of Pennsylvania
28hereby enacts as follows:

1Section 1. Short title.

2This act shall be known and may be cited as the Capital
3Budget Project Itemization Act of <-2012-2013 2013-2014.

4Section 2. Total authorizations.

5(a) Public improvements.--The total authorization for the
6additional capital projects in the category of public
7improvement projects itemized in section 3 and to be acquired or
8constructed by the Department of General Services, its
9successors or assigns, and to be financed by the incurring of
10debt, shall be <-$3,572,285,000 $3,897,449,000 $3,977,449,000.

11(b) Furniture and equipment.--The total authorization for
12the additional capital projects in the category of public
13improvement projects consisting of the acquisition of original
14movable furniture and equipment to complete public improvement
15projects itemized in section 4 and to be acquired by the
16Department of General Services, its successors or assigns, and
17to be financed by the incurring of debt, shall be $137,620,000<- 
18$138,120,000 $150,120,000<-.

19(c) Transportation assistance.--The total authorization for
20the capital projects in the category of transportation
21assistance projects itemized in section 5 with respect to which
22an interest is to be acquired in or constructed by the
23Department of Transportation, its successors or assigns, and to
24be financed by the incurring of debt, shall be $1,718,429,000<- 
25$1,823,639,000 $1,846,93<-9,000.

26(d) Redevelopment assistance.--The total authorization for
27the capital projects in the category of redevelopment assistance
28capital projects itemized in section 6 for capital grants by the
29Department of Community and Economic Development, its successors
30or assigns, and to be financed by the incurring of debt, shall

1be <-$3,965,614,000 $6,077,447,000 $6,438,618,000.

2(e) Flood control.--The total authorization for the capital
3projects in the category of flood control projects itemized in
4section 7 and to be constructed by the Department of
5Environmental Protection, its successors or assigns, and to be
6financed by the incurring of debt, shall be $78,702,000<- 
7$127,852,000 $13<-7,852,000.

8(f) Keystone Recreation, Park and Conservation Fund.--The
9total authorization for the capital projects in the category of
10public improvement projects itemized in section 8 and to be
11constructed by the Department of Conservation and Natural
12Resources, its successors or assigns, and to be financed from
13current revenues in the Keystone Recreation, Park and
14Conservation Fund, shall be $59,202,000.

15(g) State forestry bridge projects.--The total authorization
16for the capital projects itemized in section 9 to be constructed
17by the Department of Conservation and Natural Resources, its
18successors or assigns, and to be financed by oil company
19franchise tax revenues pursuant to 75 Pa.C.S. § 9502(a)(2)(iv)
20(relating to imposition of tax), shall be $25,155,000.

21(h) State ATV/snowmobile projects.--The total authorization
22for the capital projects itemized in section 10 to be
23constructed by the Department of Conservation and Natural
24Resources, its successors or assigns, and to be financed from
25current revenues in the State ATV/Snowmobile Fund, shall be 
26$250,000.

27(i) Fish Fund and Boat Fund projects.--The total
28authorization for the capital projects in the category of public
29improvement projects itemized in section 11 to be acquired or
30developed by the Pennsylvania Fish and Boat Commission and to be

1financed by the incurring of debt or by current revenues of the
2Fish Fund and the Boat Fund pursuant to executive authorization
3shall be $128,741,000.

4(j) Manufacturing Fund current revenue projects.--The total
5authorization for the capital projects in the category of public
6improvement projects itemized in section 12 and to be
7constructed by the Department of General Services, its
8successors or assigns, and to be financed from current revenues
9in the Manufacturing Fund, shall be $7,500,000.

10(k) Oil and Gas Lease Fund current revenue projects.--The
11total authorization for the capital projects in the category of
12public improvement projects itemized in section 13 to be
13acquired or developed by the Department of Conservation and
14Natural Resources and to be financed by current revenues of the
15Oil and Gas Lease Fund pursuant to executive authorization shall
16be $698,000.

17(l) Environmental Stewardship Fund current revenue
18projects.--The total authorization for the capital projects in
19the category of public improvement projects itemized in section
2014 to be acquired or developed by the Department of Conservation
21and Natural Resources and to be financed by current revenues of
22the Environmental Stewardship Fund pursuant to executive
23authorization shall be $900,000.

<-24(m) Highway bridge projects.--The total authorization for
25capital projects in the category of highway bridge projects
26itemized in section 15 to be constructed by the Department of
27Transportation, its successors or assigns, and to be financed by
28the incurring of debt or from current revenue shall be $190,000.
29As used in this subsection, the term "capital project" shall
30mean a capital project as defined in section 302 of the act of

1February 9, 1999 (P.L.1, No.1), known as the Capital Facilities
2Debt Enabling Act, and shall include a county or municipal
3bridge rehabilitation, replacement or improvement project as set
4forth in section 15.

5(n) State Stores Fund current revenue projects.--The total<-
6authorization for the capital projects in the category of public
7improvement projects itemized in section 15.1 and to be
8developed by the Department of General Services, its successors
9or assigns, for the Pennsylvania Liquor Control Board, and to be
10financed from current revenues of the State Stores Fund shall be
11$4,000,000.

12Section 3. Itemization of public improvement capital projects.

13(a) General rule.--Additional capital projects in the
14category of public improvement projects to be constructed or
15acquired by the Department of General Services, its successors
16or assigns, and to be financed by the incurring of debt, are
17hereby itemized, together with their respective estimated
18financial costs, as follows:

19 

20Project

Total Project

Allocation

21(1) Department of Agriculture

 

22(i) Farm Show Complex

 

23(A) Upgrade Farm Show Complex, including 
24new entrance to Expo Hall with meeting 
25rooms and covered walkway

 

26Project Allocation

3,000,000

27(Base Project Allocation - $3,000,000)

 

<-28(B) Repave parking lot adjacent to
29Elmerton Avenue lot

 

30(B) Upgrade and improvements to parking

 

1areas

 

2Project Allocation

2,000,000

3(Base Project Allocation - $2,000,000)

 

<-4(C) Construct new parking garage to
5accommodate increased patronage during
6large show events

 

7Project Allocation

10,000,000

8(Base Project Allocation -
9$10,000,000)

 

<-10(C) Land acquisition, demolition,
11construction, infrastructure and other
12related costs for development and
13expansion of Farm Show Complex parking
14facilities.

 

15Project Allocation

10,000,000

16(Base Project Allocation -
17$10,000,000)

 

18(ii) Health Diagnostic Laboratory

 

19(A) Construct new plant industry
20laboratory in Harrisburg to satisfy
21modern testing procedures

 

22Project Allocation

10,000,000

23(Base Project Allocation -
24$10,000,000)

 

25(B) Construct new Pennsylvania Equine
26Toxicology and Research Laboratory on
27New Bolton Campus of The University of
28Pennsylvania

 

29Project Allocation

7,000,000

30(Base Project Allocation - $7,000,000)

 

1(2) Department of Conservation and Natural
2Resources

 

3(i) Bald Eagle State Forest

 

4(A) Repair roadways, including drainage 
5along Poe Valley Road

 

6Project Allocation

960,000

7(Base Project Allocation - $800,000)

 

8(Design & Contingencies - $160,000)

 

9(i.1) Bald Eagle State Park

 

10(A) Construct an addition to the park
11office and maintenance building

 

12Project Allocation

4,080,000

13(Base Project Allocation - $3,400,000)

 

14(Design & Contingencies - $680,000)

 

15(i.2) Black Moshannon State Park

 

16(A) Develop ten additional family cabins
17with vehicle access and connection of
18utilities

 

19Project Allocation

3,000,000

20(Base Project Allocation - $2,400,000)

 

21(Design & Contingencies - $600,000)

 

22(ii) Blue Knob State Park

 

23(A) Replace two office buildings and
24combine into one modern office
25building

 

26Project Allocation

2,400,000

27(Base Project Allocation - $2,400,000)

 

28(ii.1) Buchanan State Forest

 

29(A) Construction of a new maintenance 
30headquarters

 

1Project Allocation

3,000,000

2(Base Project Allocation - $2,500,000)

 

3(Design & Contingencies - $500,000)

 

4(iii) Caledonia State Park

 

5(A) Rehabilitate campground restrooms and
6shower houses with modern facilities

 

7Project Allocation

3,000,000

8(Base Project Allocation - $3,000,000)

 

9(B) Replace water lines throughout park

 

10Project Allocation

900,000

11(Base Project Allocation - $900,000)

 

12(iv) Cherry Springs State Park

 

13(A) Construct visitors and administrative
14center to accommodate increased park
15usage

 

16Project Allocation

8,000,000

17(Base Project Allocation - $8,000,000)

 

18(v) Codorus State Park

 

<-19(A) Rehabilitate and pave roads and
20parking lots for visitor safety

 

21Project Allocation

2,400,000

22(Base Project Allocation - $2,400,000)

 

23(B) Rehabilitate and pave roads and 
24parking lots for visitor safety

 

25Project Allocation

2,400,000

26(Base Project Allocation - $2,400,000)

 

<-27(A) Rehabilitate and pave roads and
28parking lots for visitor safety

 

29Project Allocation

4,800,000

30(Base Project Allocation - $4,800,000)

 

1(vi) Colonel Denning State Park

 

2(A) Replace pit restroom, add sewer lines
3and replace campground restrooms and
4shower houses with modern facilities

 

5Project Allocation

1,800,000

6(Base Project Allocation - $1,800,000)

 

7(vii) Cowans Gap State Park

 

8(A) Construct park office addition and
9maintenance building addition

 

10Project Allocation

1,200,000

11(Base Project Allocation - $1,200,000)

 

12(viii) Delaware Canal State Park

 

13(A) Provide for repair and ongoing
14maintenance of Delaware Canal

 

15Project Allocation

10,000,000

16(Base Project Allocation -
17$10,000,000)

 

18(B) Replacement of 12 adjacent box beam 
19bridges along Delaware Canal

 

20Project Allocation

16,200,000

21(Base Project Allocation -
22$13,500,000)

 

23(Design & Contingencies - $2,700,000)

 

24(C) Construct a new resource center with 
25storage building to meet current needs

 

26Project Allocation

3,300,000

27(Base Project Allocation - $2,750,000)

 

28(Design & Contingencies - $550,000)

 

29(D) Rehabilitate Pecks Pond Dam

 

30Project Allocation

7,200,000

1(Base Project Allocation - $6,000,000)

 

2(Design & Contingencies - $1,200,000)

 

<-3(E) Construction, infrastructure,
4redevelopment and other related costs
5for rehabilitation of THE Delaware
6Canal State Park in Riegelsville to
7Bristol

 

8Project Allocation

5,000,000

9(Base Project Allocation - $5,000,000)

 

10(viii.1) Delaware State Forest

 

11(A) Construct a new resource center with 
12storage building

 

13Project Allocation

8,400,000

14(Base Project Allocation - $7,000,000)

 

15(Design & Contingencies - $1,400,000)

 

16(ix) Denton Hill State Park

 

17(A) Rehabilitate park, including ski
18lodge, ski lifts, snowmaking
19equipment, roads, parking lots, modern
20cabins and maintenance facilities for
21a four-season operation

 

22Project Allocation

12,000,000

23(Base Project Allocation -
24$12,000,000)

 

25(ix.1) Forbes State Forest

 

26(A) Remediate three acid mines 
27originating on State forest lands

 

28Project Allocation

1,800,000

29(Base Project Allocation - $1,500,000)

 

30(Design & Contingencies - $300,000)

 

1(x) Forest District 10

 

2(A) Replace failed acid mine drainage
3treatment system to reduce pollutants
4in Kettle Creek watershed

 

5Project Allocation

2,000,000

6(Base Project Allocation - $2,000,000)

 

7(xi) Forest District 11

 

8(A) Construct bridge over Lehigh River to
9provide public and administrative
10access to Blue Ridge Tract of
11Lackawanna State Forest with public
12parking

 

13Project Allocation

3,500,000

14(Base Project Allocation - $3,500,000)

 

15(xii) Forest District 12

 

16(A) Construct bridge over Slate Run

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(B) Demolish old building and build
20public restrooms and contact station
21on Pine Creek Rail Trail

 

22Project Allocation

4,500,000

23(Base Project Allocation - $4,500,000)

 

24(xiii) Forest District 13

 

25(A) Remediate and reclaim acid mine
26drainage pollution source on
27Commonwealth's land into Little Dents
28Run watershed

 

29Project Allocation

8,000,000

30(Base Project Allocation - $8,000,000)

 

1(xiv) Forest District 14

 

2(A) Locate, plug and retire abandoned oil
3and gas wells on State forest land

 

4Project Allocation

2,000,000

5(Base Project Allocation - $2,000,000)

 

6(xv) Gifford Pinchot State Park

 

7(A) Replace water lines which are in
8continual need of repair

 

9Project Allocation

1,560,000

10(Base Project Allocation - $1,560,000)

 

11(B) Repave main road, including drainage

 

12Project Allocation

780,000

13(xvi) Greenwood Furnace State Park

 

14(A) Construct new maintenance building to
15meet modern codes

 

16Project Allocation

1,800,000

17(Base Project Allocation - $1,800,000)

 

18(xvii) Hickory Run State Park

 

<-19(A) Construct new visitors center with
20administration facilities and comfort
21station and demolish old center

 

22Project Allocation

7,500,000

23(Base Project Allocation - $7,500,000)

 

<-24(A) Construct new visitors center with
25administration facilities and comfort
26station and demolish old center

 

27Project Allocation

8,000,000

28(Base Project Allocation - $8,000,000)

 

29(B) Develop and construct family cabin
30colony within park

 

1Project Allocation

3,000,000

2(Base Project Allocation - $3,000,000)

 

3(C) Rehabilitate and upgrade office to
4accommodate personnel

 

5Project Allocation

8,000,000

6(Base Project Allocation - $8,000,000)

 

7(xviii) Kettle Creek State Park

 

8(A) Dredge lake and provide for improved
9quality recreational opportunities in
10and around Kettle Creek Reservoir

 

11Project Allocation

2,000,000

12(Base Project Allocation - $1,600,000)

 

13(Design & Contingencies - $400,000)

 

14(xviii.1) Kinzua Bridge State Park

 

15(A) Additional funds for DGS project 130-
161, Phase 2, construction of new
17office/visitor center, maintenance
18center, roads, trails, parking lots,
19water and sewage systems, clearing and
20grubbing of debris field, fencing of
21debris field, rehabilitation of
22remaining bridge towers and related
23site work

 

24Project Allocation

3,000,000

25(Base Project Allocation - $2,400,000)

 

26(Design & Contingencies - $600,000)

 

27(B) Construction of site improvements,
28including infrastructure and land
29acquisition

 

30Project Allocation

2,000,000

1(Base Project Allocation - $1,600,000)

 

2(Design & Contingencies - $400,000)

 

3(xviii.2) Kittanning State Forest

 

4(A) Restore iron furnace

 

5Project Allocation

1,600,000

6(Base Project Allocation - $1,500,000)

 

7(Design & Contingencies - $100,000)

 

8(xviii.3) Lackawanna State Forest

 

9(A) Breach and remove Olyphant #1 Dam

 

10Project Allocation

900,000

11(Base Project Allocation - $750,000)

 

12(Design & Contingencies - $150,000)

 

13(xix) Lackawanna State Park

 

14(A) Replace pool

 

15Project Allocation

6,000,000

16(Base Project Allocation - $4,800,000)

 

17(Design & Contingencies - $1,200,000)

 

18(xx) Laurel Mountain State Park

 

19(A) Develop Phase II of ski area, adding
20ski and visitor service, including
21support facilities, lifts and tubing
22park

 

23Project Allocation

3,000,000

24(Base Project Allocation - $3,000,000)

 

25(xx.1) Lehigh Gorge State Park

 

26(A) Rehabilitate White Haven public 
27access area to include trail 
28improvement, parking facilities, 
29modern comfort station and boat launch

 

30Project Allocation

4,122,000

1(Base Project Allocation - $3,435,000)

 

2(Design & Contingencies - $687,000)

 

3(xx.2) Little Buffalo State Park

 

4(A) Replacement of old cottages

 

5Project Allocation

500,000

6(Base Project Allocation - $400,000)

 

7(Design & Contingencies - $100,000)

 

8(xxi) Maurice K. Goddard State Park

 

9(A) Replace existing marina facility with
10new structure for boat concession
11operations, public restrooms and
12meeting room space

 

13Project Allocation

2,400,000

14(Base Project Allocation - $2,400,000)

 

15(xxi.1) Michaux State Forest

 

16(A) Rehabilitate Old Forge Picnic area, 
17pump house and dredge pond to meet 
18modern codes

 

19Project Allocation

450,000

20(Base Project Allocation - $350,000)

 

21(Design & Contingencies - $100,000)

 

22(xxii) Moraine State Park

 

23(A) Upgrade sewage treatment facilities

 

24Project Allocation

5,000,000

25(Base Project Allocation - $5,000,000)

 

26(xxiii) Ohiopyle State Park

 

27(A) Develop family cabin colony with
28vehicle access and connection of
29utilities

 

30Project Allocation

3,000,000

1(Base Project Allocation - $2,400,000)

 

2(Design & Contingencies - $600,000)

 

3(B) Improvements to Ferncliff parking lot 
4and provide additional parking 
5facilities adjacent to the falls area

 

6Project Allocation

3,600,000

7(Base Project Allocation - $3,000,000)

 

8(Design & Contingencies - $600,000)

 

9(xxiii.1) Park Region #2

 

10(A) Removal of ten underground fuel tanks 
11and remediate the land in seven State 
12parks and replace aboveground tanks

 

13Project Allocation

3,300,000

14(Base Project Allocation - $2,750,000)

 

15(Design & Contingencies - $550,000)

 

16(xxiv) Penn Nursery and Woodshop

 

17(A) Replace outdated maintenance shop to
18meet current code requirements

 

19Project Allocation

5,500,000

20(Base Project Allocation - $5,500,000)

 

21(xxiv.1) Pine Grove Furnace State Park

 

22(A) Replacement of waterlines throughout 
23park

 

24Project Allocation

2,040,000

25(Base Project Allocation - $1,700,000)

 

26(Design & Contingencies - $340,000)

 

27(xxv) Point State Park

 

28(A) Connect Great Allegheny Passage Trail
29to Point State Park and rehabilitate
30flag bastion, pedestrian access and

 

1parking lots

 

2Project Allocation

9,000,000

3(Base Project Allocation - $9,000,000)

 

4(xxvi) Presque Isle State Park

 

5(A) Replenish sand to maintain beach

 

6Project Allocation

10,000,000

7(Base Project Allocation -
8$10,000,000)

 

9(B) Replace three beach/shower houses,
10including design, site location and
11construction

 

12Project Allocation

3,600,000

13(Base Project Allocation - $3,600,000)

 

14(xxvii) Prince Gallitzin State Park

 

15(A) Replace two pit restrooms with modern
16facilities at Wyerough and sailboat
17mooring areas

 

18Project Allocation

960,000

19(Base Project Allocation - $960,000)

 

20(B) Replace water lines throughout park

 

21Project Allocation

3,240,000

22(Base Project Allocation - $3,240,000)

 

23(C) Repave main road, including drainage
24to beach

 

25Project Allocation

2,400,000

26(Base Project Allocation - $2,400,000)

 

27(D) Replacement of six miles of water
28lines within the park

 

29Project Allocation

5,000,000

30(Base Project Allocation - $4,000,000)

 

1(Design & Contingencies - $1,000,000)

 

2(xxviii) Pymatuning State Park

 

3(A) Rehabilitate campground facilities
4for full-service hook-ups, including
5new water well, water storage tanks
6and sewage collection system

 

7Project Allocation

2,400,000

8(Base Project Allocation - $2,400,000)

 

9(B) Replacement of existing livery docks
10throughout the park

 

11Project Allocation

3,600,000

12(Base Project Allocation - $3,000,000)

 

13(Design & Contingencies - $600,000)

 

14(xxix) Ryerson Station State Park

 

<-15(A) Rehabilitate dam

 

16Project Allocation

5,000,000

17(Base Project Allocation - $5,000,000)

 

<-18(A) Rehabilitate dam

 

19Project Allocation

15,000,000

20(Base Project Allocation -
21$15,000,000)

 

22(B) Dredging of sediment in Duke Lake

 

23Project Allocation

7,800,000

24(Base Project Allocation - $6,500,000)

 

25(Design & Contingencies - $1,300,000)

 

26(xxx) Samuel S. Lewis State Park

 

27(A) Replace pit restroom with modern
28facilities, including onsite septic
29system

 

30Project Allocation

1,200,000

1(Base Project Allocation - $1,200,000)

 

2(xxxi) Shawnee State Park

 

3(A) Replace regional office to meet
4modern code requirements and increase
5efficiency

 

6Project Allocation

3,600,000

7(Base Project Allocation - $3,600,000)

 

8(xxxii) Shikellamy State Park

 

9(A) Replace dam bags that have reached
10their life expectancy

 

11Project Allocation

4,000,000

12(Base Project Allocation - $4,000,000)

 

13(xxxii.1) Susquehannock State Park

 

14(A) Rehabilitate entryway from township
15road to park overlook

 

16Project Allocation

360,000

17(Base Project Allocation - $300,000)

 

18(Design & Contingencies - $60,000)

 

19(xxxii.2) Tioga State Forest

 

20(A) Construction of new maintenance
21headquarters

 

22Project Allocation

3,600,000

23(Base Project Allocation - $3,000,000)

 

24(Design & Contingencies - $600,000)

 

25(xxxii.3) Tuscarora State Forest

<-

26(A) Additional funds for DGS 196-11,
27Gunter Valley Dam, including
28construction of new dam control tower,
29dam embankment and foundation
30rehabilitation and repair and

 

1improvements to site access roadway
2and appurtenances

 

3Project Allocation

10,000,000

4(Base Project Allocation -
5$10,000,000)

 

6(xxxii.3) Various lakes

<-

7(xxxii.4) Various lakes<-

 

8(A) Dredging of various lakes throughout
9this Commonwealth and removing
10sediment

 

11Project Allocation

3,295,000

12(Base Project Allocation - $2,746,000)

 

13(Design & Contingencies - $549,000)

 

14(xxxiii) Tobyhanna State Park

 

15(A) Rehabilitate Tobyhanna No. 2 dam

 

16Project Allocation

8,500,000

17(Base Project Allocation - $7,000,000)

 

18(Design & Contingencies - $1,500,000)

 

19(xxxiv) Whipple Dam State Park

 

20(A) Replace bathhouse with modern
21facility and add onsite septic system

 

22Project Allocation

1,800,000

23(Base Project Allocation - $1,800,000)

 

24(xxxv) Various Parks and Forest Districts

 

25(A) Rehabilitate or replace lookout fire
26towers throughout park system

 

27Project Allocation

6,000,000

28(Base Project Allocation - $4,800,000)

 

29(Design & Contingencies - $1,200,000)

 

30(3) Department of Corrections

 

1(i) Elizabethtown Training Academy

 

2(A) Replace domestic and fire water lines
3and add fire hydrants

 

4Project Allocation

500,000

5(Base Project Allocation - $400,000)

 

6(Design & Contingencies - $100,000)

 

7(B) Renovate boiler plant, including
8boilers and associated equipment

 

9Project Allocation

3,125,000

10(Base Project Allocation - $2,500,000)

 

11(Design & Contingencies - $625,000)

 

12(C) Replace current fire alarm system

 

13Project Allocation

450,000

14(Base Project Allocation - $360,000)

 

15(Design & Contingencies - $90,000)

 

16(i.1) State Correctional Institution at
17Albion

 

18(A) Replace various roofs throughout
19institution

 

20Project Allocation

1,200,000

21(Base Project Allocation - $960,000)

 

22(Design & Contingencies - $240,000)

 

23(B) Replace fire alarm system throughout
24institution

 

25Project Allocation

900,000

26(Base Project Allocation - $720,000)

 

27(Design & Contingencies - $180,000)

 

28(ii) State Correctional Institution at
29Cambridge Springs

 

30(A) Replace 5,260 feet of current

 

1perimeter security system, which is
2obsolete and no longer supported by
3the manufacturer

 

4Project Allocation

1,200,000

5(Base Project Allocation - $960,000)

 

6(Design & Contingencies - $240,000)

 

7(B) Install perimeter lights around
8circumference of institution

 

9Project Allocation

1,565,000

10(Base Project Allocation - $1,252,000)

 

11(Design & Contingencies - $313,000)

 

12(iii) State Correctional Institution at Camp
13Hill

 

<-14(A) Renovate boiler plant to repair or
15replace worn out equipment, modify
16pollution controls system and utilize
17most effective fuel source

 

<-18(A) Renovate boiler plant to repair or
19replace worn out equipment and modify
20pollution controls system

 

21Project Allocation

4,000,000

22(Base Project Allocation - $3,200,000)

 

23(Design & Contingencies - $800,000)

 

24(B) Renovate kitchen No. 2

 

25Project Allocation

12,500,000

26(Base Project Allocation -
27$10,000,000)

 

28(Design & Contingencies - $2,500,000)

 

29(C) Demolish housing units A, B, C and D
30and construct four new housing units

 

1Project Allocation

81,000,000

2(Base Project Allocation -
3$64,800,000)

 

4(Design & Contingencies - $16,200,000)

 

5(iv) State Correctional Institution at
6Chester

 

7(A) Replace various roofs throughout
8institution

 

9Project Allocation

7,000,000

10(Base Project Allocation - $5,600,000)

 

11(Design & Contingencies - $1,400,000)

 

12(v) State Correctional Institution at Coal

 

13(A) Replace rubber roofing on all inmate
14housing units

 

15Project Allocation

3,500,000

16(Base Project Allocation - $2,800,000)

 

17(Design & Contingencies - $700,000)

 

18(vi) State Correctional Institution at Dallas

 

19(A) Expand existing visiting room with
20approximately 2,000-square-foot
21addition to handle increased
22visitation demands

 

23Project Allocation

400,000

24(Base Project Allocation - $320,000)

 

25(Design & Contingencies - $80,000)

 

26(B) Additional funding to upgrade storm
27and sewage plant project 578-24

 

28Project Allocation

4,000,000

29(Base Project Allocation - $3,200,000)

 

30(Design & Contingencies - $800,000)

 

1(vii) State Correctional Institution at
2Fayette

 

3(A) Upgrade security system, including
4door control, intercom, public address
5and perimeter security head unit for
6the institution

 

7Project Allocation

1,300,000

8(Base Project Allocation - $1,040,000)

 

9(Design & Contingencies - $260,000)

 

10(viii) State Correctional Institution at
11Forest

 

12(A) Replace 5,300 feet of current
13perimeter security system which is
14obsolete and no longer supported by
15the manufacturer

 

16Project Allocation

1,430,000

17(Base Project Allocation - $1,144,000)

 

18(Design & Contingencies - $286,000)

 

19(B) Repair or replace the HTHW (High
20Temperature Hot Water) piping
21distribution system.

 

22Project Allocation

4,000,000

23(Base Project Allocation - $3,200,000)

 

24(Design & Contingencies - $800,000)

 

25(C) Upgrade or replace institution's
26intercom system

 

27Project Allocation

700,000

28(Base Project Allocation - $560,000)

 

29(Design & Contingencies - $140,000)

 

30(ix) State Correctional Institution at

 

1Graterford

 

2(A) Replace 5,300 feet of current
3perimeter security system which is
4obsolete and no longer supported by
5the manufacturer

 

6Project Allocation

1,200,000

7(Base Project Allocation - $960,000)

 

8(Design & Contingencies - $240,000)

 

9(B) Remove and replace EPDM roofing and
10drain system on Correctional
11Industries and maintenance buildings

 

12Project Allocation

1,375,000

13(Base Project Allocation - $1,100,000)

 

14(Design & Contingencies - $275,000)

 

15(x) State Correctional Institution at
16Greensburg

 

17(A) Replace 4,224 feet of current
18perimeter security system which is
19obsolete and no longer supported by
20the manufacturer

 

21Project Allocation

750,000

22(Base Project Allocation - $600,000)

 

23(Design & Contingencies - $150,000)

 

24(xi) State Correctional Institution at
25Houtzdale

 

26(A) Replace current microwave security
27system with a buried coaxial system

 

28Project Allocation

1,020,000

29(Base Project Allocation - $816,000)

 

30(Design & Contingencies - $204,000)

 

1(B) Renovate boiler plant equipment,
2modify pollution controls systems and
3utilize most cost-effective fuel
4source available

 

5Project Allocation

2,250,000

6(Base Project Allocation - $1,800,000)

 

7(Design & Contingencies - $450,000)

 

8(xii) State Correctional Institution at
9Huntingdon

 

10(A) Replace electrical services to blocks
11and cells to meet current power demand
12requirements

 

13Project Allocation

8,500,000

14(Base Project Allocation - $6,800,000)

 

15(Design & Contingencies - $1,700,000)

 

16(xiii) State Correctional Institution at
17Laurel Highlands

 

18(A) Replace perimeter security detection
19system, including taut wire system on
20perimeter fence, and add new razor
21wire

 

22Project Allocation

2,500,000

23(Base Project Allocation - $2,000,000)

 

24(Design & Contingencies - $500,000)

 

25(xiv) State Correctional Institution at
26Mahanoy

 

27(A) Repair deteriorated face block on
28inmate housing units and repair
29infrastructure

 

30Project Allocation

15,000,000

1(Base Project Allocation -
2$12,000,000)

 

3(Design & Contingencies - $3,000,000)

 

4(B) Replace rubber roofing and metal
5roofing on all inmate housing units

 

6Project Allocation

3,800,000

7(Base Project Allocation - $3,040,000)

 

8(Design & Contingencies - $760,000)

 

9(C) Replace personal alarm system
10throughout institution

 

11Project Allocation

425,000

12(Base Project Allocation - $340,000)

 

13(Design & Contingencies - $85,000)

 

14(D) Replace block walls surrounding Level
155 housing unit exercise yard pens
16which have deteriorated from normal
17settling of structures

 

18Project Allocation

500,000

19(Base Project Allocation - $400,000)

 

20(Design & Contingencies - $100,000)

 

21(E) Expand parking and repave access
22roads and parking lots

 

23Project Allocation

800,000

24(Base Project Allocation - $640,000)

 

25(Design & Contingencies - $160,000)

 

26(xv) State Correctional Institution at Mercer

 

27(A) Replace rubber roofing on all inmate
28housing units

 

29Project Allocation

750,000

30(Base Project Allocation - $600,000)

 

1(Design & Contingencies - $150,000)

 

2(B) Repave existing perimeter road and
3install new perimeter road along new
4perimeter fence path

 

5Project Allocation

458,000

6(Base Project Allocation - $366,000)

 

7(Design & Contingencies - $92,000)

 

8(C) Replace cell doors on A, F and M
9blocks

 

10Project Allocation

1,600,000

11(Base Project Allocation - $1,280,000)

 

12(Design & Contingencies - $320,000)

 

13(D) Upgrade electrical panels, switches
14and breakers throughout facility

 

15Project Allocation

600,000

16(Base Project Allocation - $480,000)

 

17(Design & Contingencies - $120,000)

 

18(xvi) State Correctional Institution at Muncy

 

19(A) Install new 1,000,000-gallon water
20tower and install new water line for
21municipal water service tie-in

 

22Project Allocation

3,000,000

23(Base Project Allocation - $2,400,000)

 

24(Design & Contingencies - $600,000)

 

25(B) Expand existing visiting room with
26approximately 15,000-square-foot
27addition to handle increased
28visitation demands

 

29Project Allocation

5,300,000

30(Base Project Allocation - $4,240,000)

 

1(Design & Contingencies - $1,060,000)

 

2(C) Replace 6,340 feet of current
3perimeter security system which is
4obsolete and no longer supported by
5the manufacturer

 

6Project Allocation

1,430,000

7(Base Project Allocation - $1,144,000)

 

8(Design & Contingencies - $286,000)

 

9(D) Replace existing sewer lines which
10are obsolete and causing ground water
11infiltration

 

12Project Allocation

1,875,000

13(Base Project Allocation - $1,500,000)

 

14(Design & Contingencies - $375,000)

 

15(E) Construct new admissions building and
16demolish current building

 

17Project Allocation

625,000

18(Base Project Allocation - $500,000)

 

19(Design & Contingencies - $125,000)

 

20(F) Expand parking lot and repave access
21roads and parking lots

 

22Project Allocation

1,800,000

23(Base Project Allocation - $1,440,000)

 

24(Design & Contingencies - $360,000)

 

25(G) Replace existing modular housing unit
26to make ADA compliant

 

27Project Allocation

1,250,000

28(Base Project Allocation - $1,000,000)

 

29(Design & Contingencies - $250,000)

 

30(H) Construct new treatment center

 

1Project Allocation

3,125,000

2(Base Project Allocation - $2,500,000)

 

3(Design & Contingencies - $625,000)

 

4(I) Renovate housing units, including ADA
5improvements, electrical upgrades and
6HVAC systems and replace windows and
7doors

 

8Project Allocation

12,500,000

9(Base Project Allocation -
10$10,000,000)

 

11(Design & Contingencies - $2,500,000)

 

12(xvii) State Correctional Institution at Pine
13Grove

 

14(A) Replace 5,310 feet of current
15perimeter security system which is
16obsolete and no longer supported by
17the manufacturer

 

18Project Allocation

2,000,000

19(Base Project Allocation - $1,600,000)

 

20(Design & Contingencies - $400,000)

 

21(B) Expand and renovate main control room

 

22Project Allocation

680,000

23(Base Project Allocation - $544,000)

 

24(Design & Contingencies - $136,000)

 

25(xviii) State Correctional Institution at
26Pittsburgh

 

27(A) Replace 5,520 feet of current
28perimeter security system which is
29obsolete and no longer supported by
30the manufacturer

 

1Project Allocation

1,200,000

2(Base Project Allocation - $960,000)

 

3(Design & Contingencies - $240,000)

 

4(B) Replace leaking steam and condensate
5piping from power plant to A & B
6housing units

 

7Project Allocation

565,000

8(Base Project Allocation - $452,000)

 

9(Design & Contingencies - $113,000)

 

10(xix) State Correctional Institution at
11Rockview

 

12(A) Replace and add fencing to front of
13institution

 

14Project Allocation

2,400,000

15(Base Project Allocation - $1,920,000)

 

16(Design & Contingencies - $480,000)

 

17(B) Replace existing water tank at
18institution

 

19Project Allocation

1,440,000

20(Base Project Allocation - $1,152,000)

 

21(Design & Contingencies - $288,000)

 

22(C) Replace windows in treatment building

 

23Project Allocation

2,400,000

24(Base Project Allocation - $1,920,000)

 

25(Design & Contingencies - $480,000)

 

26(D) Additional funds for DGS Project 571-
2730, upgrade reservoir to meet dam
28safety regulations

 

29Project Allocation

3,518,000

30(Base Project Allocation - $2,814,000)

 

1(Design & Contingencies - $704,000)

 

2(E) Renovate boiler plant ash handling
3system to meet current regulations

 

4Project Allocation

625,000

5(Base Project Allocation - $500,000)

 

6(Design & Contingencies - $125,000)

 

7(F) Renovate exterior of main dining hall
8and auditorium building, including
9refacing and repairing of concrete and
10sealing building

 

11Project Allocation

2,000,000

12(Base Project Allocation - $1,600,000)

 

13(Design & Contingencies - $400,000)

 

14(G) Renovate exterior of deputy warden's
15building, including refacing and
16repairing of concrete and sealing
17building

 

18Project Allocation

1,000,000

19(Base Project Allocation - $800,000)

 

20(Design & Contingencies - $200,000)

 

21(H) Expand parking and repave access
22roads and parking lots

 

23Project Allocation

800,000

24(Base Project Allocation - $640,000)

 

25(Design & Contingencies - $160,000)

 

26(xx) State Correctional Institution at
27Smithfield

 

28(A) Renovate boilers and equipment,
29modify pollution controls and provide
30effective fuel source

 

1Project Allocation

3,500,000

2(Base Project Allocation - $2,800,000)

 

3(Design & Contingencies - $700,000)

 

4(xxi) State Correctional Institution at
5Somerset

 

6(A) Renovate 480-volt distribution
7switchgear and replace obsolete
8circuit breakers

 

9Project Allocation

432,000

10(Base Project Allocation - $346,000)

 

11(Design & Contingencies - $86,000)

 

12(B) Replace existing digital management
13system panels throughout institution

 

14Project Allocation

420,000

15(Base Project Allocation - $336,000)

 

16(Design & Contingencies - $84,000)

 

17(C) Replace roof on Correctional
18Industries Laundry Building

 

19Project Allocation

910,000

20(Base Project Allocation - $728,000)

 

21(Design & Contingencies - $182,000)

 

22(D) Replace proximity card access system
23throughout institution for door
24control

 

25Project Allocation

625,000

26(Base Project Allocation - $500,000)

 

27(Design & Contingencies - $125,000)

 

28(E) Replace rooftop heating and cooling
29units on inmate housing

 

30Project Allocation

775,000

1(Base Project Allocation - $620,000)

 

2(Design & Contingencies - $155,000)

 

3(F) Install new water pump within
4facility

 

5Project Allocation

500,000

6(Base Project Allocation - $500,000)

 

7(xxii) State Correctional Institution at
8Waymart

 

9(A) Repoint exterior building masonry and
10repair parapets and brick work
11throughout institution

 

12Project Allocation

3,420,000

13(Base Project Allocation - $2,736,000)

 

14(Design & Contingencies - $684,000)

 

15(B) Demolish J-Ward and repair corridor
16and roof structure at current building
17tie-in point

 

18Project Allocation

840,000

19(Base Project Allocation - $672,000)

 

20(Design & Contingencies - $168,000)

 

21(C) Renovate and expand existing dining
22room to satisfy current needs

 

23Project Allocation

3,300,000

24(Base Project Allocation - $2,640,000)

 

25(Design & Contingencies - $660,000)

 

26(D) Construct a new education building

 

27Project Allocation

4,600,000

28(Base Project Allocation - $3,680,000)

 

29(Design & Contingencies - $920,000)

 

30(E) Expand parking and repave access

 

1roads and parking lots

 

2Project Allocation

1,750,000

3(Base Project Allocation - $1,400,000)

 

4(Design & Contingencies - $350,000)

 

5(F) Additional funding to renovate boiler
6plant project No. 1578-7

 

7Project Allocation

4,260,000

8(Base Project Allocation - $3,408,000)

 

9(Design & Contingencies - $852,000)

 

10(G) Renovate and expand A block housing
11unit

 

12Project Allocation

2,500,000

13(Base Project Allocation - $2,000,000)

 

14(Design & Contingencies - $500,000)

 

15(xxiii) State Correctional Institutions
16Statewide

 

17(A) Replace door control systems and
18central control, housing units and
19other buildings

 

20Project Allocation

9,000,000

21(Base Project Allocation - $7,200,000)

 

22(Design & Contingencies - $1,800,000)

 

23(4) Department of Education

 

24(i) Department of Education Headquarters

 

25(A) Renovate two floors of Department of
26Education headquarters building at 333
27Market Street, Harrisburg

 

28Project Allocation

1,000,000

29(Base Project Allocation - $1,000,000)

 

30(ii) Delaware County Community College

 

1(A) Construction, infrastructure and
2other related costs for renovation of
3the existing Technical High School
4Pickering Campus

 

5Project Allocation

2,400,000

6(Base Project Allocation - $2,000,000)

 

7(Design & Contingencies - $400,000)

 

8(iii) Lehigh Carbon Community College

 

9(A) Site development, infrastructure,
10redevelopment, construction and other
11costs related to construction of an
12educational facility in Carbon County

 

13Project Allocation

4,800,000

14(Base Project Allocation - $4,000,000)

 

15(Design & Contingencies - $800,000)

 

16(iv) Lincoln University

 

17(A) Additional funds for DGS Project No.
181101-46, construction of additional
19tennis courts, softball field, soccer
20field and bleachers to support track
21and soccer fields

 

22Project Allocation

20,000,000

23(Base Project Allocation -
24$16,000,000)

 

25(Design & Contingencies - $4,000,000)

 

26(B) Provide for new construction and
27renovation of three existing
28facilities to create the Center for
29the Study of Black Culture at the
30university

 

1Project Allocation

25,000,000

2(Base Project Allocation -
3$20,000,000)

 

4(Design & Contingencies - $5,000,000)

 

5(C) Renovate and expand Alumni House

 

6Project Allocation

20,000,000

7(Base Project Allocation -
8$16,000,000)

 

9(Design & Contingencies - $4,000,000)

 

10(v) Pennsylvania Highlands Community College

 

11(A) Acquisition, construction,
12rehabilitation and other costs related
13to the design and construction of
14facilities to be utilized as a branch
15campus to be located in Mifflin County

 

16Project Allocation

600,000

17(Base Project Allocation - $500,000)

 

18(Design & Contingencies - $100,000)

 

19(vi) Community College of Philadelphia

 

20(A) Renovation of biology labs and
21associated prep rooms at main campus
22and West Regional Center

 

23Project Allocation

4,800,000

24(Base Project Allocation - $4,000,000)

 

25(Design & Contingencies - $800,000)

 

26(vi.1) Reading Area Community College

 

27(A) Construction, infrastructure
28improvements and related costs for the
29Reading Area Community College Berks
30Hall renovation and conservation

 

1project

 

2Project Allocation

1,167,000

3(Base Project Allocation - $1,167,000)

 

4(B) Construction, infrastructure
5improvements and related costs for the
6Reading Area Community College
7pedestrian safety, gateway and traffic
8improvement project

 

9Project Allocation

2,356,000

10(Base Project Allocation - $2,356,000)

 

11(vii) Temple University

 

<-12(A) Renovate and modernize existing
13entrance to Tomlinson Hall

 

14Project Allocation

4,500,000

15(Base Project Allocation - $3,600,000)

 

16(Design & Contingencies - $900,000)

 

17(B) Renovate and construct an addition to
18Gladfelter Hall to house a Center for
19Scholars

 

20Project Allocation

2,700,000

21(Base Project Allocation - $2,400,000)

 

22(Design & Contingencies - $300,000)

 

<-23(A) (Reserved)

 

24(B) (Reserved)

 

25(C) Renovate Paley Library

 

26Project Allocation

90,000,000

27(Base Project Allocation -
28$90,000,000)

 

29(D) Renovate Old Dental School

 

30Project Allocation

75,000,000

1(Base Project Allocation -
2$75,000,000)

 

3(E) Renovate and expand law school

 

4Project Allocation

60,000,000

5(Base Project Allocation -
6$60,000,000)

 

7(F) Renovate and construct addition to
8College of Engineering

 

9Project Allocation

100,000,000

10(Base Project Allocation -
11$100,000,000)

 

12(G) Demolition of Barton Hall and
13construct campus quad, Main Campus

 

14Project Allocation

10,000,000

15(Base Project Allocation -
16$10,000,000)

 

17(H) Reface and renovate Health Sciences
18Campus

 

19Project Allocation

35,000,000

20(Base Project Allocation -
21$35,000,000)

 

22(I) Acquisition, infrastructure,
23renovations, construction and other
24related costs to support a dental,
25medical, health sciences and patient
26care facilities project in Lackawanna
27County

 

28Project Allocation

20,000,000

29(Base Project Allocation -
30$20,000,000)

 

<-1(J) Construction, infrastructure and
2other related costs for development of
3a multiuse facility for athletics,
4academics and research and local
5community athletic events

 

6Project Allocation

130,000,000

7(Base Project Allocation -
8$130,000,000)

 

9(viii) Thaddeus Stevens College of Technology

 

10(A) Upgrade and rehabilitate college's
11main electrical system, including
12infrastructure

 

13Project Allocation

3,000,000

14(Base Project Allocation - $2,400,000)

 

15(Design & Contingencies - $600,000)

 

16(B) Expand dining hall by adding second
17story which will connect into Hartzell
18Instructional Center

 

19Project Allocation

5,750,000

20(Base Project Allocation - $5,060,000)

 

21(Design & Contingencies - $690,000)

 

22(C) Infrastructure, development, design
23and other costs related to demolition
24of Leonard Building and construction
25of technology center

 

26Project Allocation

16,800,000

27(Base Project Allocation -
28$14,000,000)

 

29(Design & Contingencies - $2,800,000)

 

30(D) Renovate Mellor Classroom and

 

1Administrative Building

 

2Project Allocation

1,017,000

3(Base Project Allocation - $895,000)

 

4(Design & Contingencies - $122,000)

 

5(E) Upgrade electrical system campus-wide

 

6Project Allocation

2,875,000

7(Base Project Allocation - $2,530,000)

 

8(Design & Contingencies - $345,000)

 

9(F) Renovate Learning Resource Center to
10meet modern codes, including ADA and
11HVAC

 

12Project Allocation

2,300,000

13(Base Project Allocation - $2,018,000)

 

14(Design & Contingencies - $282,000)

 

15(G) Upgrade HVAC, including controls in
16three main buildings and two auxiliary
17buildings

 

18Project Allocation

400,000

19(Base Project Allocation - $352,000)

 

20(Design & Contingencies - $48,000)

 

21(H) Renovate metal fabrication and
22welding shop, including new exhaust
23system and welding stations

 

24Project Allocation

250,000

25(Base Project Allocation - $220,000)

 

26(Design & Contingencies - $30,000)

 

27(I) Abatement of lead paint and painting
28of two campus buildings

 

29Project Allocation

230,000

30(Base Project Allocation - $202,000)

 

1(Design & Contingencies - $28,000)

 

2(J) Renovate Hartzell Hall to include a
3second floor with additional classroom
4and office space

 

5Project Allocation

5,000,000

6(Base Project Allocation - $4,400,000)

 

7(Design & Contingencies - $600,000)

 

8(K) Upgrade IT distribution, including
9electrical wiring throughout campus

 

10Project Allocation

5,000,000

11(Base Project Allocation - $4,400,000)

 

12(Design & Contingencies - $600,000)

 

13(ix) The Pennsylvania State University

 

14(A) Convert existing coal-fired boilers
15to natural gas to comply with new
16EPA/DEP clean air regulations

 

17Project Allocation

25,000,000

18(Base Project Allocation -
19$20,000,000)

 

20(Design & Contingencies - $5,000,000)

 

21(B) Provide for continuation of capital
22to renovate campuses located in
23university's eastern region

 

24Project Allocation

28,000,000

25(Base Project Allocation -
26$28,000,000)

 

27(C) Design, infrastructure, construction,
28renovations, abatement of hazardous
29materials, utility upgrades and
30extensions and other related costs for

 

1state-of-the-art research and teaching
2space for College of Liberal Arts

 

3Project Allocation

54,000,000

4(Base Project Allocation -
5$43,200,000)

 

6(Design & Contingencies - $10,800,000)

 

7(D) Design, infrastructure, renovations,
8abatement of hazardous materials and
9other related costs for building
10access modifications, including
11installation of key access boxes and
12video surveillance cameras and
13infrastructure and any building
14modifications needed

 

15Project Allocation

10,000,000

16(Base Project Allocation - $8,000,000)

 

17(Design & Contingencies - $2,000,000)

 

18(E) Design, infrastructure, construction,
19renovations, abatement of hazardous
20materials, underground piping upgrades
21and additions and other related costs
22for a chilled water capacity and
23distribution expansion project at
24University Park campus

 

25Project Allocation

25,000,000

26(Base Project Allocation -
27$20,000,000)

 

28(Design & Contingencies - $5,000,000)

 

29(F) Design, infrastructure, construction,
30abatement of hazardous materials,

 

1utility upgrades and extensions and
2other related costs for new
3classroom/class lab building at
4University Park campus

 

5Project Allocation

51,300,000

6(Base Project Allocation -
7$41,040,000)

 

8(Design & Contingencies - $10,260,000)

 

9(G) Additional funding for renovations,
10rehabilitation, construction and other
11costs related to an addition to
12existing computer building or
13construction of new facility

 

14Project Allocation

10,000,000

15(Base Project Allocation -
16$10,000,000)

 

17(H) Design, acquisition, infrastructure,
18demolition, construction, abatement of
19hazardous materials, utility upgrades
20and extensions, and other related
21costs for a general computing Tier II<-I
22data center

 

23Project Allocation

50,000,000

24(Base Project Allocation -
25$40,000,000)

 

26(Design & Contingencies - $10,000,000)

 

27(I) Additional funding for renovations to
28Henning Building, including upgrades
29to systems to bring them to current
30facility standards

 

1Project Allocation

15,000,000

2(Base Project Allocation -
3$15,000,000)

 

4(J) Infrastructure, renovations,
5construction, abatement of hazardous
6materials, utility upgrades and
7extensions and other related costs for
8the rehabilitation of Kostos Building

 

9Project Allocation

12,000,000

10(Base Project Allocation - $9,600,000)

 

11(Design & Contingencies - $2,400,000)

 

12(K) Design, infrastructure, construction,
13abatement of hazardous materials,
14utility upgrades and extensions and
15other related costs for a capital
16renewal project to Baker Engineering
17and Science Building

 

18Project Allocation

8,000,000

19(Base Project Allocation - $6,400,000)

 

20(Design & Contingencies - $1,600,000)

 

21(L) Design, infrastructure, construction,
22abatement of hazardous materials,
23utility upgrades and extensions and
24other related costs for new Recital
25Hall addition and Music I renovations

 

26Project Allocation

25,000,000

27(Base Project Allocation -
28$20,000,000)

 

29(Design & Contingencies - $5,000,000)

 

30(M) Design, infrastructure, construction,

 

1abatement of hazardous materials,
2utility upgrades and extensions and
3other related costs for a capital
4renewal project to Ruhl
5Student/Community Center and the
6attached multipurpose building

 

7Project Allocation

10,500,000

8(Base Project Allocation - $8,400,000)

 

9(Design & Contingencies - $2,100,000)

 

10(N) Design, infrastructure, construction,
11abatement of hazardous materials,
12utility extensions and other related
13costs for Student Union building at
14Brandywine

 

15Project Allocation

16,000,000

16(Base Project Allocation -
17$12,800,000)

 

18(Design & Contingencies - $3,200,000)

 

19(O) Design, infrastructure, construction,
20abatement of hazardous materials, and
21other related costs for capital
22renewal project to waste water
23treatment plant at University Park
24campus

 

25Project Allocation

45,000,000

26(Base Project Allocation -
27$36,000,000)

 

28(Design & Contingencies - $9,000,000)

 

29(P) Additional funding for
30infrastructure, construction and other

 

1related costs for construction of
2water treatment facility and
3distribution system at University Park

 

4Project Allocation

15,000,000

5(Base Project Allocation -
6$15,000,000)

 

7(Q) Design, infrastructure, construction,
8abatement of hazardous materials, and
9other related costs for athletic field
10conversion and expansion project at
11Pennsylvania College of Technology

 

12Project Allocation

1,200,000

13(Base Project Allocation - $1,000,000)

 

14(Design & Contingencies - $200,000)

 

15(R) Design, infrastructure, construction
16and other related costs for career and
17alumni center at Pennsylvania College
18of Technology

 

19Project Allocation

13,200,000

20(Base Project Allocation -
21$11,000,000)

 

22(Design & Contingencies - $2,200,000)

 

23(S) Design, infrastructure, construction
24and other related costs for athletic,
25fitness and wellness center at
26Pennsylvania College of Technology

 

27Project Allocation

30,000,000

28(Base Project Allocation -
29$25,000,000)

 

30(Design & Contingencies - $5,000,000)

 

1(T) Design, infrastructure, construction,
2abatement of hazardous materials and
3other related costs, including utility
4upgrades and extensions, site
5improvements and code-related upgrades
6for multiphased development of Pattee
7Library Knowledge Commons at
8University Park

 

9Project Allocation

11,000,000

10(Base Project Allocation - $8,800,000)

 

11(Design & Contingencies - $2,200,000)

 

12(U) Construct new data center at Milton
13S. Hershey Medical Center

 

14Project Allocation

24,000,000

15(Base Project Allocation -
16$24,000,000)

 

<-17(V) Design, infrastructure, construction,
18demolition, renovations, abatement of
19hazardous materials, utility upgrades
20and extensions and other related costs
21for state-of-the-art research and
22teaching space for College of
23Engineering

 

24Project Allocation

100,000,000

25(Base Project Allocation -
26$80,000,000)

 

27(Design & Contingencies - $20,000,000)

 

<-28(W) Original furniture and equipment for
29state-of-the-art research and teaching
30space for College of Engineering

 

1Project Allocation

15,000,000

2(Base Project Allocation -
3$15,000,000)

 

4(X) Construction, infrastructure and
5other related costs for medical and
6educational facilities for Penn State
7Hershey Medical Center

 

8Project Allocation

50,000,000

9(Base Project Allocation -
10$50,000,000)

 

<-11(Y) Design, infrastructure, construction,
12demolition, renovations, abatement of
13hazardous materials, utility upgrades
14and extensions and other related costs
15for College of Agricultural Sciences.

 

16Project Allocation

80,000,000

17(Base Project Allocation -
18$64,000,000)

 

19(Design & Contingencies - $16,000,000)

 

<-20(Z) Design, infrastructure, construction,
21demolition, renovations, abatement of
22hazardous materials, utility upgrades
23and extensions and other related costs
24for state-of-the-art research and
25teaching space for College of
26Engineering

 

27Project Allocation

100,000,000

28(Base Project Allocation -
29$80,000,000)

 

30(Design & Contingencies - $20,000,000)

 

1(x) University of Pittsburgh

 

2(A) Renovate exterior of Hillman Library,
3including plaza, planters, windows,
4masonry and waterproofing membrane

 

5Project Allocation

10,000,000

6(Base Project Allocation - $8,000,000)

 

7(Design & Contingencies - $2,000,000)

 

8(B) Renovate Fitzgerald Fieldhouse to
9meet modern codes, including ADA, and
10expand building to meet demands

 

11Project Allocation

10,000,000

12(Base Project Allocation - $8,000,000)

 

13(Design & Contingencies - $2,000,000)

 

14(C) Renovate and construct addition to
15Trees Hall

 

16Project Allocation

40,000,000

17(Base Project Allocation -
18$40,000,000)

 

19(D) Renovate and construct addition to
20Fitzgerald Fieldhouse

 

21Project Allocation

20,000,000

22(Base Project Allocation -
23$20,000,000)

 

24(E) Renovate Bellefield Hall

 

25Project Allocation

15,000,000

26(Base Project Allocation -
27$15,000,000)

 

28(F) Renovate, construct addition and fit-
29out to Posvar Hall

 

30Project Allocation

30,000,000

1(Base Project Allocation -
2$30,000,000)

 

3(G) Renovation and addition to David
4Lawrence Hall

 

5Project Allocation

30,000,000

6(Base Project Allocation -
7$30,000,000)

 

8(H) Upgrade to Trees Field

 

9Project Allocation

20,000,000

10(Base Project Allocation -
11$20,000,000)

 

12(I) Upgrade and deferred maintenance --
13Phase VII

 

14Project Allocation

20,000,000

15(Base Project Allocation -
16$20,000,000)

 

17(J) Programmatic renovations - Phase III

 

18Project Allocation

20,000,000

19(Base Project Allocation -
20$20,000,000)

 

21(5) Department of Environmental Protection

 

22(i) Allegheny County

 

23(A) Acquisition, construction, 
24infrastructure and other related costs 
25for aviation, industrial and 
26commercial site development and 
27improvements, including flood 
28mitigation and structural 
29improvements, at or surrounding 
30Allegheny County Airport

 

1Project Allocation

40,000,000

2(Base Project Allocation -
3$40,000,000)

 

4(B) Construction, infrastructure
5improvements and other costs related
6to the development of de-icing fluid
7treatment facility at Pittsburgh
8International Airport, including flood
9mitigation structural improvements

 

10Project Allocation

25,000,000

11(Base Project Allocation -
12$25,000,000)

 

13(C) Acquisition, construction,
14infrastructure and other related costs
15for the development of industrial and
16commercial sites at or surrounding
17Pittsburgh International Airport

 

18Project Allocation

50,000,000

19(Base Project Allocation -
20$50,000,000)

 

21(D) Acquisition, construction,
22infrastructure and other related costs
23for Pitcairn Borough Dirty Camp Run
24flood protection project

 

25Project Allocation

1,360,000

26(Base Project Allocation - $1,360,000)

 

27(ii) Cambria County

 

28(A) Additional funding for DGS Project
29183-19, flood protection project in
30Adams and Croyle Townships for south

 

1fork of Little Conemaugh River,
2including earthen levee repair and
3concrete channel rehabilitation

 

4Project Allocation

1,800,000

5(Base Project Allocation - $1,620,000)

 

6(Design & Contingencies - $180,000)

 

7(B) Rehabilitate existing flood
8protection in Northern Cambria
9Borough, including replacement of
10drainage structures, pedestrian ramp
11and mitigation

 

12Project Allocation

1,350,000

13(Base Project Allocation - $1,215,000)

 

14(Design & Contingencies - $135,000)

 

15(iii) Carbon County

 

16(A) Provide for complete rehabilitation
17of flood protection to bring existing
18flood protection to current standards
19in Weissport Borough

 

20Project Allocation

3,750,000

21(Base Project Allocation - $3,000,000)

 

22(Design & Contingencies - $750,000)

 

23(iv) Clearfield County

 

24(A) Rehabilitate existing flood
25protection in Irvona Borough,
26including replacement of drainage
27structures, elimination of two closure
28structures and mitigation

 

29Project Allocation

1,800,000

30(Base Project Allocation - $1,620,000)

 

1(Design & Contingencies - $180,000)

 

2(v) Columbia County

 

3(A) Provide additional funds for flood
4protection project in Town of
5Bloomsburg currently being designed by
6Baltimore District to satisfy post-
7Hurricane Katrina Federal guidelines

 

8Project Allocation

10,000,000

9(Base Project Allocation -
10$10,000,000)

 

11(B) Provide for flood protection for the
12town of Bloomsburg, including
13watershed and channel improvements

 

14Project Allocation

70,000,000

15(Base Project Allocation -
16$59,500,000)

 

17(Design & Contingencies - $10,500,000)

 

18(vi) Dauphin County

 

19(A) Acquire and rehabilitate or construct
20south central regional office

 

21Project Allocation

22,750,000

22(Base Project Allocation -
23$20,475,000)

 

24(Design & Contingencies - $2,275,000)

 

25(vii) Lancaster County

 

26(A) Additional funding for DGS Project
27182-21, Marietta Borough flood
28protection project, including
29embankment, earthen levee, concrete
30wall closure and gates

 

1Project Allocation

20,700,000

2(Base Project Allocation -
3$18,630,000)

 

4(Design & Contingencies - $2,070,000)

 

5(viii) Lehigh County

 

6(A) Construction of a storm water
7retention system for flooding
8mitigation in Borough of Fountain Hill
9Mill 2 complex

 

10Project Allocation

1,000,000

11(Base Project Allocation - $1,000,000)

 

12(ix) Luzerne County

 

13(A) Repair or replace debris dam
14embankment and its inlet works on
15Brown Creek and replace damaged storm
16drains within Plymouth Borough

 

17Project Allocation

1,800,000

18(Base Project Allocation - $1,620,000)

 

19(Design & Contingencies - $180,000)

 

20(B) Additional funding for DGS Project
21183-3, stream bank stabilization in
22Pittston Township, including
23mitigation and maintenance on access
24ramps

 

25Project Allocation

1,350,000

26(Base Project Allocation - $1,215,000)

 

27(Design & Contingencies - $135,000)

 

28(x) Monroe County

 

29(A) Construction, infrastructure
30improvements and other costs related

 

1to Skytop Dam restoration

 

2Project Allocation

2,000,000

3(Base Project Allocation - $2,000,000)

 

4(xi) Montgomery County

 

5(A) Additional funding for DGS Project
6181-08, raising level of levees along
7Tacony Creek, construction of concrete
8channel, extension of culvert box and
9construction of new SEPTA railroad
10bridge for stream flow improvement in
11Cheltenham and Abington Townships

 

12Project Allocation

4,000,000

13(Base Project Allocation - $3,200,000)

 

14(Design & Contingencies - $800,000)

 

15(B) Additional funding for DGS Project
16181-17, Sandy Run flood protection
17project, in Abington and Upper Dublin
18Townships, including channel
19realignment and improvements,
20including mitigation

 

21Project Allocation

360,000

22(Base Project Allocation - $324,000)

 

23(Design & Contingencies - $36,000)

 

24(C) Additional funding for DGS Project
25181-8, raising level of levees along
26Tacony Creek, construction of concrete
27channel, extension of culvert box and
28construction of new SEPTA railroad
29bridge for stream flow improvement in
30Glenside area of Cheltenham Township,

 

1including raising of concrete channel
2wall and earthen levee and
3constructing concrete channel with
4culvert

 

5Project Allocation

1,800,000

6(Base Project Allocation - $1,620,000)

 

7(Design & Contingencies - $180,000)

 

8(D) Construction, infrastructure
9improvements and other costs related
10to Abington stream bank stabilization
11flood control project

 

12Project Allocation

200,000

13(Base Project Allocation - $200,000)

 

14(xii) Philadelphia County

 

15(A) Construction, infrastructure, storm
16water management and restoration of
17tidal wetland for Penn Treaty Park
18Phase I project

 

19Project Allocation

20,000,000

20(Base Project Allocation -
21$20,000,000)

 

22(B) Lake renovations and other costs
23related to Franklin Delano Roosevelt
24Park

 

25Project Allocation

20,000,000

26(Base Project Allocation -
27$20,000,000)

 

28(6) Department of General Services

 

29(i) Berks County

 

30(A) Upgrade and renovate two elevators in

 

1Reading State Office Building,
2including replacement of controller,
3car fixtures, corridor fixtures door
4operator, tracks/hangars and power
5unit

 

6Project Allocation

250,000

7(Base Project Allocation - $150,000)

 

8(Design & Contingencies - $100,000)

 

9(B) Completely renovate two elevators,
10including motors and remodeling, in
11Reading State Office Building

 

12Project Allocation

250,000

13(Base Project Allocation - $150,000)

 

14(Design & Contingencies - $100,000)

 

15(C) Replace coal boilers with more
16efficient system in Reading State
17Office Building

 

18Project Allocation

1,000,000

19(Base Project Allocation - $800,000)

 

20(Design & Contingencies - $200,000)

 

21(D) Upgrade security at Reading State
22Office Building

 

23Project Allocation

100,000

24(Base Project Allocation - $100,000)

 

25(i.1) Cambria County

 

26(A) Demolition, construction,
27infrastructure, abatement of hazardous
28materials and other costs related to
29the State Corrections Facility at SCI
30Cresson property reuse project

 

1Project Allocation

15,000,000

2(Base Project Allocation -
3$15,000,000)

 

4(ii) Dauphin County

 

5(A) Replace wiring in all lighting
6fixtures in Main Capitol Building

 

7Project Allocation

1,500,000

8(Base Project Allocation - $1,500,000)

 

9(B) Upgrade and renovate all existing
10elevators, including upgrading motors
11and remodeling cabs, in Finance
12Building

 

13Project Allocation

1,820,000

14(Base Project Allocation - $1,638,000)

 

15(Design & Contingencies - $182,000)

 

16(C) Upgrade and renovate all existing
17elevators, including upgrading motors
18and remodeling cabs, in Forum Building

 

19Project Allocation

1,820,000

20(Base Project Allocation - $1,638,000)

 

21(Design & Contingencies - $182,000)

 

22(D) Replace roof, including paver
23supports, roof membrane and roof and
24parapet material of Keystone Building

 

25Project Allocation

2,500,000

26(Base Project Allocation - $2,000,000)

 

27(Design & Contingencies - $500,000)

 

28(E) Replace parapet roof, including full
29removal of old roof and repair
30spalling, in Finance Building

 

1Project Allocation

700,000

2(Base Project Allocation - $600,000)

 

3(Design & Contingencies - $100,000)

 

4(F) Repair roof-interstice space between
5roof and ceiling and tie into control
6system in Main Capitol Building

 

7Project Allocation

1,000,000

8(Base Project Allocation - $900,000)

 

9(Design & Contingencies - $100,000)

 

10(G) Replace roof and windows in Matthew
11J. Ryan Office Building

 

12Project Allocation

550,000

13(Base Project Allocation - $500,000)

 

14(Design & Contingencies - $50,000)

 

15(H) Remove and replace architectural
16grade shingles, remove and replace BUR
17roofs with R-30 insulation and EPDM
18roofing and replace EPDM roof on
19windows, including insulation, in DGS
20Annex Complex, Administration Building

 

21Project Allocation

113,000

22(Base Project Allocation - $110,000)

 

23(Design & Contingencies - $3,000)

 

24(I) Install central air conditioning in
25Chapel Building of DGS Annex Complex

 

26Project Allocation

116,000

27(Base Project Allocation - $113,000)

 

28(Design & Contingencies - $3,000)

 

29(J) Repair or replace damaged sandstone
30headers along entryway of Archives

 

1Building

 

2Project Allocation

310,000

3(Base Project Allocation - $300,000)

 

4(Design & Contingencies - $10,000)

 

5(K) Reline cooling towers, including
6membrane for chillers, at Central
7Plant

 

8Project Allocation

1,500,000

9(Base Project Allocation - $1,500,000)

 

10(L) Construct ADA entrance in North
11Office Building

 

12Project Allocation

750,000

13(Base Project Allocation - $700,000)

 

14(Design & Contingencies - $50,000)

 

15(M) Repave or rebuild various annex
16cartways at DGS Annex Complex

 

17Project Allocation

681,000

18(Base Project Allocation - $681,000)

 

19(N) Replace moduline diffuser in East
20Wing Building

 

21Project Allocation

381,000

22(Base Project Allocation - $381,000)

 

23(O) Completely renovate elevators,
24including motors and remodeling, in
25Finance Building

 

26Project Allocation

910,000

27(Base Project Allocation - $700,000)

 

28(Design & Contingencies - $210,000)

 

29(P) Completely renovate elevators,
30including motors and remodeling, in

 

1Forum Building

 

2Project Allocation

910,000

3(Base Project Allocation - $700,000)

 

4(Design & Contingencies - $210,000)

 

5(Q) Repair or replace pavers within
6Keystone Building Plaza

 

7Project Allocation

2,000,000

8(Base Project Allocation - $1,500,000)

 

9(Design & Contingencies - $500,000)

 

10(R) Completely replace roof of Arsenal
11Building, including flashing and roof
12drains

 

13Project Allocation

700,000

14(Base Project Allocation - $600,000)

 

15(Design & Contingencies - $100,000)

 

16(S) Replace chiller that controls cooling
17system in 22nd and Forster Building

 

18Project Allocation

600,000

19(Base Project Allocation - $480,000)

 

20(Design & Contingencies - $120,000)

 

21(T) Replace moduline diffusers in Rachel
22Carson Building

 

23Project Allocation

1,000,000

24(Base Project Allocation - $800,000)

 

25(Design & Contingencies - $200,000)

 

26(U) Completely renovate all building
27restrooms in Health and Welfare
28Building

 

29Project Allocation

4,000,000

30(Base Project Allocation - $3,200,000)

 

1(Design & Contingencies - $800,000)

 

2(V) Completely renovate all building
3restrooms in Labor and Industry
4Building

 

5Project Allocation

8,000,000

6(Base Project Allocation - $6,400,000)

 

7(Design & Contingencies - $1,600,000)

 

8(W) Replace secondary switchgear in State
9Museum Building, including under floor
10feeders

 

11Project Allocation

2,500,000

12(Base Project Allocation - $2,000,000)

 

13(Design & Contingencies - $500,000)

 

14(X) Replace generator in Petry Building

 

15Project Allocation

500,000

16(Base Project Allocation - $400,000)

 

17(Design & Contingencies - $100,000)

 

<-18(Y) Replace security and fire detection
19systems at Northwest Office Building
20located on Forster Street

 

21Project Allocation

11,500,000

22(Base Project Allocation -
23$10,500,000)

 

24(Design & Contingencies - $1,000,000)

 

25(Z) Install replacement windows
26throughout Northwest Office Building
27located on Forster Street

 

28Project Allocation

1,000,000

29(Base Project Allocation - $900,000)

 

30(Design & Contingencies - $100,000)

 

1(AA) Repoint bad joints and install
2vertical expansion joints in exterior
3wall corners of Northwest Office
4Building located on Forster Street

 

5Project Allocation

1,000,000

6(Base Project Allocation - $900,000)

 

7(Design & Contingencies - $100,000)

 

<-8(BB) Upgrade security in Capitol Complex

 

<-9(BB) Upgrade security in State buildings
10and facilities within the City of
11Harrisburg and Susquehanna Township

 

<-12(Y) Upgrade security in State buildings
13and facilities within the City of
14Harrisburg and Susquehanna Township

 

15Project Allocation

5,800,000

16(Base Project Allocation - $5,800,000)

 

17(iii) Lackawanna County

 

18(A) Upgrade security at the Scranton
19State Office Building

 

20Project Allocation

100,000

21(Base Project Allocation - $100,000)

 

22(iv) Philadelphia County

 

23(A) Renovations and rehabilitation of
24Pennsylvania Convention Center
25Facilities

 

26Project Allocation

38,000,000

27(Base Project Allocation -
28$38,000,000)

 

29(6.1) Pennsylvania Emergency Management Agency

 

30(i) Eastern Area Office Building

 

1(A) Demolish and remediate old Eastern
2Area Office on grounds of Hamburg
3Center

 

4Project Allocation

1,000,000

5(Base Project Allocation - $900,000)

 

6(Design & Contingencies - $100,000)

 

7(7) Pennsylvania Historical and Museum
8Commission

 

<-9(i) Bowman's Hill Wildflower Preserve

 

10(A) Construction and other related costs
11for Bowman's Hill Wildflower Preserve
12visitor center

 

13Project Allocation

2,500,000

14(Base Project Allocation - $2,500,000)

 

15(i) <-(ii) Brandywine Battlefield Park

 

16(A) Acquisition, infrastructure,
17renovation, construction and other
18related costs for redevelopment and
19preservation of Welcome Center and
20other historic buildings and access
21improvements

 

22Project Allocation

7,200,000

23(Base Project Allocation - $6,000,000)

 

24(Design & Contingencies - $1,200,000)

 

25(ii) <-(iii) Daniel Boone Homestead

 

26(A) Restore Daniel Boone Homestead and
27other structures at site

 

28Project Allocation

3,600,000

29(Base Project Allocation - $3,000,000)

 

30(Design & Contingencies - $600,000)

 

1(iii) <-(iv) Eckley Miners' Village

 

2(A) Install fire protection system,
3including construction of water main
4to provide sufficient fire suppression
5to buildings

 

6Project Allocation

3,600,000

7(Base Project Allocation - $3,000,000)

 

8(Design & Contingencies - $600,000)

 

9(B) Provide for Phase IV of preservation
10and restoration of miners' houses,
11including structural and interior
12restoration, infrastructure and
13restoration of outbuildings

 

14Project Allocation

4,800,000

15(Base Project Allocation - $4,000,000)

 

16(Design & Contingencies - $800,000)

 

17(iv) <-(v) Erie Maritime Museum

 

18(A) Provide for replacement of portions
19of existing exhibits, selective
20exhibit component improvements, new
21energy-efficient exhibit lighting and
22installation of new exhibits

 

23Project Allocation

3,600,000

24(Base Project Allocation - $3,000,000)

 

25(Design & Contingencies - $600,000)

 

26(v) <-(vi) Landis Valley Village and Farm
27Museum

 

28(A) Replace underground sewage, water,
29electrical, phone, data and fire and
30security lines throughout site and

 

1upgrade HVAC system with new
2geothermal systems and other energy-
3saving equipment and features

 

4Project Allocation

9,000,000

5(Base Project Allocation - $7,500,000)

 

6(Design & Contingencies - $1,500,000)

 

7(B) Install fire protection system,
8including construction of water main
9to provide sufficient fire suppression
10to buildings

 

11Project Allocation

3,600,000

12(Base Project Allocation - $3,000,000)

 

13(Design & Contingencies - $600,000)

 

14(C) Provide site improvements, including
15preservation and restoration of
16interior and exterior of buildings

 

17Project Allocation

3,600,000

18(Base Project Allocation - $3,000,000)

 

19(Design & Contingencies - $600,000)

 

20(D) Design, fabricate and install new
21permanent exhibits for new visitor
22center

 

23Project Allocation

4,000,000

24(Base Project Allocation - $4,000,000)

 

25(vi) <-(vii) Old Economy Village

 

26(A) Rehabilitate exterior and structure
27of up to 18 buildings, including
28painting, roofing, moisture barriers,
29repair of structural members, masonry,
30gutters and drainage chimneys,

 

1electrical, wastewater systems, HVAC
2and water supply lines with
3archaeological investigations at site

 

4Project Allocation

3,000,000

5(Base Project Allocation - $2,500,000)

 

6(Design & Contingencies - $500,000)

 

7(vii) <-(viii) Pennsbury Manor

 

8(A) Install fire protection system,
9including construction of water main
10to provide sufficient fire suppression
11to buildings

 

12Project Allocation

2,400,000

13(Base Project Allocation - $2,000,000)

 

14(Design & Contingencies - $400,000)

 

15(viii) <-(ix) Pennsylvania Anthracite Heritage
16Museum

 

17(A) Install fire protection system,
18including bringing sufficient water to
19building and installation of new
20sprinklers and gas/chemical
21suppression system in collection area

 

22Project Allocation

960,000

23(Base Project Allocation - $800,000)

 

24(Design & Contingencies - $160,000)

 

25(ix) <-(x) Pennsylvania Lumber Museum

 

26(A) Provide for second phase of exhibits
27in main gallery, as well as outdoor
28site interpretive signage and exhibits

 

29Project Allocation

3,600,000

30(Base Project Allocation - $3,000,000)

 

1(Design & Contingencies - $600,000)

 

2(x) <-(xi) Railroad Museum of Pennsylvania

 

3(A) Install fire protection system,
4including construction of water main
5to provide sufficient fire suppression
6to buildings

 

7Project Allocation

1,200,000

8(Base Project Allocation - $1,000,000)

 

9(Design & Contingencies - $200,000)

 

10(x.1) <-(xii) Scranton Iron Furnaces

 

11(A) Restore and stabilize furnaces,
12including masonry, drainage, lighting,
13security, fencing and infrastructure

 

14Project Allocation

6,000,000

15(Base Project Allocation - $5,000,000)

 

16(Design & Contingencies - $1,000,000)

 

17(xi) <-(xiii) Washington Crossing Historic Park

 

18(A) Provide restoration and improvements
19to Bowman's Hill Tower and ancillary
20facilities

 

21Project Allocation

6,000,000

22(Base Project Allocation - $5,000,000)

 

23(Design & Contingencies - $1,000,000)

 

24(B) Install fire protection system,
25including construction of water main
26to provide sufficient fire suppression
27to buildings

 

28Project Allocation

2,400,000

29(Base Project Allocation - $2,000,000)

 

30(Design & Contingencies - $400,000)

 

1(8) Department of Labor and Industry

 

2(i) Labor and Industry Building, Harrisburg,
3Dauphin County

 

4(A) Replace two high voltage
5transformers, including infrastructure

 

6Project Allocation

5,000,000

7(Base Project Allocation - $4,500,000)

 

8(Design & Contingencies - $500,000)

 

9(9) Department of Military and Veterans Affairs

 

10(i) (Reserved)

 

11(ii) Coraopolis Readiness Center, Allegheny
12County

 

13(A) Rehabilitate Coraopolis Readiness
14Center, including assembly hall,
15classrooms, administrative offices,
16storage space, restrooms, locker rooms
17and mechanical rooms; upgrade building
18systems (HVAC, roofs, windows, doors);
19and repair façade and parking facility

 

20Project Allocation

1,500,000

21(Base Project Allocation - $1,250,000)

 

22(Design & Contingencies - $250,000)

 

<-23(iii) Pittsburgh Hunt Readiness Center,
24Allegheny County

 

25(A) Rehabilitate Pittsburgh Hunt
26Readiness Center, including assembly
27hall, classrooms, administrative
28offices, storage space, restrooms,
29locker rooms and mechanical rooms;
30upgrade building systems (HVAC, roofs,

 

1windows, doors); repair façade; expand
2parking; and construct unheated
3storage facility

 

4Project Allocation

4,500,000

5(Base Project Allocation - $4,000,000)

 

6(Design & Contingencies - $500,000)

 

<-7(iii) (Reserved)

 

8(iv) Pittsburgh Support Maintenance Shop,
9Allegheny County

 

10(A) Combine three field maintenance shops
11with 11,300 square feet of usable
12space and 2,250 square feet of
13unheated storage

 

14Project Allocation

1,440,000

15(Base Project Allocation - $1,200,000)

 

16(Design & Contingencies - $240,000)

 

17(v) Southwestern Veterans Center, Allegheny
18County

 

19(A) Renovate and repair Southwestern
20Veterans Center, including replacement
21of facility roof

 

22Project Allocation

3,125,000

23(Base Project Allocation - $2,500,000)

 

24(Design & Contingencies - $625,000)

 

25(B) Provide for renovation and general
26repairs of Southwestern Veterans
27Center, including life safety and
28regulatory deficiencies

 

29Project Allocation

8,125,000

30(Base Project Allocation - $7,313,000)

 

1(Design & Contingencies - $812,000)

 

2(vi) Ford City Readiness Center, Armstrong
3County

 

4(A) Rehabilitate Ford City Readiness
5Center, including assembly hall,
6classrooms, administrative offices,
7storage space, restrooms, locker rooms
8and mechanical rooms; upgrade building
9systems (HVAC, roofs, windows, doors);
10repair façade; expand parking; and
11construct unheated storage facility

 

12Project Allocation

3,000,000

13(Base Project Allocation - $2,500,000)

 

14(Design & Contingencies - $500,000)

 

15(vii) Hollidaysburg Readiness Center, Blair
16County

 

17(A) Rehabilitate Hollidaysburg Readiness
18Center, including assembly hall,
19classrooms, administrative offices,
20storage space, restrooms, locker rooms
21and mechanical rooms; upgrade building
22systems (HVAC, roofs, windows, doors);
23and repair façade and parking facility

 

24Project Allocation

2,800,000

25(Base Project Allocation - $2,400,000)

 

26(Design & Contingencies - $400,000)

 

27(viii) Hollidaysburg Veterans Home, Blair
28County

 

29(A) Provide for renovation and general
30repairs of Hollidaysburg Veterans

 

1Home, including upgrading community
2living center at Eisenhower Hall and
3constructing meal delivery systems at
4Arnold and Eisenhower Halls

 

5Project Allocation

1,325,000

6(Base Project Allocation - $1,060,000)

 

7(Design & Contingencies - $265,000)

 

8(B) Provide for renovation and general
9repairs of Hollidaysburg Veterans Home

 

10Project Allocation

6,325,000

11(Base Project Allocation - $5,693,000)

 

12(Design & Contingencies - $632,000)

 

13(ix) Butler Readiness Center, Butler County

 

14(A) Rehabilitate Butler Readiness Center,
15including assembly hall, classrooms,
16administrative offices, storage space,
17restrooms, locker rooms and mechanical
18rooms; upgrade building systems (HVAC,
19roofs, windows, doors); repair façade;
20expand parking; and construct unheated
21storage facility

 

22Project Allocation

3,800,000

23(Base Project Allocation - $3,300,000)

 

24(Design & Contingencies - $500,000)

 

25(x) Southeastern Veterans Center, Chester
26County

 

27(A) Provide for renovation and general
28repairs of Southeastern Veterans
29Center, including upgrades and
30renovations at Coates Hall and

 

1construction of new maintenance
2building

 

3Project Allocation

1,925,000

4(Base Project Allocation - $1,540,000)

 

5(Design & Contingencies - $385,000)

 

6(B) Provide for renovation and general
7repairs of Southeastern Veterans
8Center, including replacement of
9facility roof

 

10Project Allocation

9,925,000

11(Base Project Allocation - $8,933,000)

 

12(Design & Contingencies - $992,000)

 

13(xi) Spring City Armory, Chester County

 

14(A) Rehabilitate Spring City Armory to
15current standards, including assembly
16hall, classrooms, administrative
17offices, storage space, restrooms,
18locker rooms and mechanical rooms;
19upgrade building systems (HVAC, roofs,
20windows, doors); repair façade; expand
21parking; and construct unheated
22storage facility

 

23Project Allocation

3,600,000

24(Base Project Allocation - $3,000,000)

 

25(Design & Contingencies - $600,000)

 

26(xii) Spring City Readiness Center, Chester
27County

 

28(A) Rehabilitate Spring City Readiness
29Center, including assembly hall,
30classrooms, administrative offices,

 

1storage space, restrooms, locker rooms
2and mechanical rooms; upgrade building
3systems (HVAC, roofs, windows, doors);
4repair façade; expand parking; and
5construct unheated storage facility

 

6Project Allocation

3,600,000

7(Base Project Allocation - $3,000,000)

 

8(Design & Contingencies - $600,000)

 

9(xiii) Lock Haven Readiness Center, Clinton
10County

 

11(A) Rehabilitate Lock Haven Readiness
12Center, including assembly hall,
13classrooms, administrative offices,
14storage space, restrooms, locker rooms
15and mechanical rooms; upgrade building
16systems (HVAC, roofs, windows, doors);
17repair façade; expand parking; and
18construct unheated storage facility

 

19Project Allocation

3,000,000

20(Base Project Allocation - $2,500,000)

 

21(Design & Contingencies - $500,000)

 

22(xiv) Harrisburg Readiness Center, Dauphin
23County

 

24(A) Rehabilitate Harrisburg Readiness
25Center, including assembly hall,
26classrooms, administrative offices,
27storage space, restrooms, locker rooms
28and mechanical rooms; upgrade building
29systems (HVAC, roofs, windows, doors);
30repair façade; expand parking; and

 

1construct unheated storage facility

 

2Project Allocation

4,600,000

3(Base Project Allocation - $4,000,000)

 

4(Design & Contingencies - $600,000)

 

5(xiv.1) Harrisburg Maintenance Shop

 

6(A) Rehabilitate Harrisburg Field
7Maintenance Shop, including
8maintenance bays, classrooms,
9administrative offices, storage
10spaces, restrooms, locker rooms and
11mechanical rooms and upgrade building
12systems, including HVAC, roofs,
13windows and doors, repairs to the
14facade, expansion of parking and
15construction of unheated storage
16facility

 

17Project Allocation

3,500,000

18(Base Project Allocation - $3,000,000)

 

19(Design & Contingencies - $500,000)

 

20(xv) Pennsylvania Soldiers and Sailors Home,
21Erie County

 

22(A) Provide for renovation and general
23repairs of Pennsylvania Soldiers and
24Sailors Home, including life safety
25and regulatory deficiencies

 

26Project Allocation

13,400,000

27(Base Project Allocation -
28$12,060,000)

 

29(Design & Contingencies - $1,340,000)

 

30(xvi) Indiana Readiness Center, Indiana

 

1County

 

2(A) Rehabilitate Indiana Readiness
3Center, including assembly hall,
4classrooms, administrative offices,
5storage space, restrooms, locker rooms
6and mechanical rooms; upgrade building
7systems (HVAC, roofs, windows, doors);
8repair façade; expand parking; and
9construct unheated storage facility

 

10Project Allocation

3,200,000

11(Base Project Allocation - $2,700,000)

 

12(Design & Contingencies - $500,000)

 

13(xvii) Gino J. Merli Veterans Center,
14Lackawanna County

 

15(A) Provide for renovation and general
16repairs of Gino J. Merli Veterans
17Center, including life safety and
18regulatory deficiencies

 

19Project Allocation

9,895,000

20(Base Project Allocation - $8,906,000)

 

21(Design & Contingencies - $989,000)

 

22(xvii.1) Scranton Maintenance Shop,
23Lackawanna County

 

24(A) Rehabilitate maintenance shop,
25administrative offices, classrooms,
26storage rooms, mechanical rooms and
27parking

 

28Project Allocation

4,500,000

29(Base Project Allocation - $4,000,000)

 

30(Design & Contingencies - $500,000)

 

1(xvii.2) New Castle Maintenance Shop,
2Lawrence County

 

3(A) Rehabilitate maintenance shop,
4administrative offices, classrooms,
5storage rooms, mechanical rooms and
6parking

 

7Project Allocation

2,500,000

8(Base Project Allocation - $2,000,000)

 

9(Design & Contingencies - $500,000)

 

10(xvii.3) Combat Aviation Brigade Readiness
11Center, Lebanon County

 

12(A) Rehabilitate 28th Aviation Brigade at
13Fort Indiantown Gap, including
14assembly hall, classrooms,
15administrative offices, storage
16spaces, restrooms, lockers, mechanical
17rooms, HVAC, infrastructure and
18parking

 

19Project Allocation

4,500,000

20(Base Project Allocation - $4,000,000)

 

21(Design & Contingencies - $500,000)

 

22(xvii.4) Recruiting and Retention Battalion,
23Lebanon County

 

24(A) Rehabilitate recruiting and retention
25battalion at Fort Indiantown Gap to
26include assembly hall, classrooms,
27administrative offices, storage
28spaces, restrooms, locker rooms and
29mechanical rooms and upgrade the
30building systems, including HVAC,

 

1roofs, windows and doors and repairs
2to facade

 

3Project Allocation

2,500,000

4(Base Project Allocation - $2,000,000)

 

5(Design & Contingencies - $500,000)

 

6(xviii) Wilkes-Barre Readiness Center,
7Luzerne County

 

8(A) Rehabilitate Wilkes-Barre Readiness
9Center, including assembly hall,
10dining facility, classrooms,
11administrative offices, storage space,
12restrooms, locker rooms, parking for
13privately owned and military vehicles
14and renovation of existing facility

 

15Project Allocation

3,000,000

16(Base Project Allocation- $2,500,000)

 

17(Design & Contingencies - $500,000)

 

18(xviii.1) Williamsport Maintenance Shop,
19Lycoming County

 

20(A) Rehabilitate maintenance shop,
21administrative offices, classrooms,
22storage rooms, mechanical rooms and
23parking

 

24Project Allocation

2,500,000

25(Base Project Allocation - $2,000,000)

 

26(Design & Contingencies - $500,000)

 

27(xix) Bradford Readiness Center, McKean
28County

 

29(A) Expand Bradford Readiness Center,
30including additional classroom,

 

1administrative offices, storage space,
2restrooms, locker rooms, mechanical
3rooms and parking facilities

 

4Project Allocation

1,200,000

5(Base Project Allocation - $1,000,000)

 

6(Design & Contingencies - $200,000)

 

7(B) Expand Bradford Readiness Center,
8including infrastructure at airport

 

9Project Allocation

1,200,000

10(Base Project Allocation - $1,000,000)

 

11(Design & Contingencies - $200,000)

 

12(xx) Kane Readiness Center, McKean County

 

13(A) Rehabilitate Kane Readiness Center,
14including assembly hall, classrooms,
15administrative offices, storage space,
16restrooms, locker rooms and mechanical
17rooms; upgrade building systems (HVAC,
18roofs, windows, doors); repair façade;
19expand parking; and construct unheated
20storage facility

 

21Project Allocation

3,300,000

22(Base Project Allocation - $2,800,000)

 

23(Design & Contingencies - $500,000)

 

24(xxi) Hermitage Readiness Center, Mercer
25County

 

26(A) Rehabilitate Hermitage Readiness
27Center, including assembly hall,
28classrooms, administrative offices,
29storage space, restrooms, locker rooms
30and mechanical rooms; upgrade building

 

1systems (HVAC, roofs, windows, doors);
2repair façade; expand parking; and
3construct unheated storage facility

 

4Project Allocation

4,700,000

5(Base Project Allocation - $4,000,000)

 

6(Design & Contingencies - $700,000)

 

7(xxii) East Stroudsburg Readiness Center,
8Monroe County

 

9(A) Rehabilitate East Stroudsburg
10Readiness Center, including assembly
11hall, classrooms, administrative
12offices, storage space, restrooms,
13locker rooms and mechanical rooms;
14upgrade building systems (HVAC, roofs,
15windows, doors); repair façade; expand
16parking; and construct unheated
17storage facility

 

18Project Allocation

3,000,000

19(Base Project Allocation - $2,400,000)

 

20(Design & Contingencies - $600,000)

 

21(xxiii) Tobyhanna Armed Forces Reserve
22Center, Monroe County

 

23(A) Rehabilitation and building expansion
24of Tobyhanna Armed Forces Center,
25including assembly hall, kitchen,
26supply, locker room, administration
27and classroom with parking, including
28maintenance facility

 

29Project Allocation

600,000

30(Base Project Allocation - $500,000)

 

1(Design & Contingencies - $100,000)

 

2(xxiv) Plymouth Meeting Readiness Center,
3Montgomery County

 

4(A) Rehabilitate Plymouth Meeting
5Readiness Center, including assembly
6hall, classrooms, administrative
7offices, storage space, restrooms,
8locker rooms and mechanical rooms;
9upgrade building systems (HVAC, roofs,
10windows, doors); repair façade; expand
11parking; and construct unheated
12storage facility

 

13Project Allocation

4,500,000

14(Base Project Allocation - $3,900,000)

 

15(Design & Contingencies - $600,000)

 

16(xxv) Delaware Valley Veterans Home,
17Philadelphia County

 

18(A) Provide for renovation and general
19repairs of Delaware Valley Veterans
20Home, including life safety and
21regulatory deficiencies

 

22Project Allocation

10,250,000

23(Base Project Allocation - $9,225,000)

 

24(Design & Contingencies - $1,025,000)

 

25(B) Provide for renovation and general
26repairs of Delaware Valley Veterans
27Home, including life safety and
28regulatory deficiencies

 

29Project Allocation

5,625,000

30(Base Project Allocation - $4,500,000)

 

1(Design & Contingencies - $1,125,000)

 

2(xxv.1) Southampton Road Readiness Center,
3Philadelphia County

 

4(A) Rehabilitate assembly hall,
5classrooms, administrative offices,
6storage space, restrooms, lockers,
7mechanical rooms, HVAC, infrastructure
8and parking

 

9Project Allocation

4,500,000

10(Base Project Allocation - $4,000,000)

 

11(Design & Contingencies - $500,000)

 

12(xxv.2) 23rd Street Readiness Center,
13Philadelphia County

 

14(A) Rehabilitate assembly hall,
15classrooms, administrative offices,
16storage spaces, restrooms, lockers,
17mechanical rooms, HVAC, infrastructure
18and parking

 

19Project Allocation

3,500,000

20(Base Project Allocation - $3,000,000)

 

21(Design & Contingencies - $500,000)

 

<-22(xxv.3) Lancaster Avenue Readiness Center,
23Philadelphia County

 

24(A) Additional funding for DGS Project
25961-26, rehabilitate Philadelphia
26Lancaster Avenue Readiness Center, to
27support construction management
28services, commissioning and additional
29contingency funds

 

30Project Allocation

2,500,000

1(Base Project Allocation - $2,500,000)

 

2(xxvi) Schuylkill County Readiness Center,
3Schuylkill County

 

4(A) Purchase 10 to 20 acres of land for
5future construction of new Schuylkill
6County Readiness Center to replace
7current facilities to meet new
8requirements

 

9Project Allocation

1,600,000

10(Land Allocation - $1,600,000)

 

11(xxvi.1) Oil City Readiness Center, Venango
12County

 

13(A) Rehabilitate assembly hall,
14classrooms, administrative offices,
15storage spaces, restrooms, locker
16rooms and mechanical rooms and upgrade
17building systems, including HVAC,
18roofs, windows, doors and repairs to
19facade

 

20Project Allocation

3,500,000

21(Base Project Allocation - $3,000,000)

 

22(Design & Contingencies - $500,000)

 

23(xxvii) Mount Pleasant Readiness Center,
24Westmoreland County

 

25(A) Rehabilitate Mount Pleasant Readiness
26Center, including assembly hall,
27classrooms, administrative offices,
28storage space, restrooms, locker rooms
29and mechanical rooms; upgrade building
30systems (HVAC, roofs, windows, doors);

 

1repair façade; expand parking; and
2construct unheated storage facility

 

3Project Allocation

3,000,000

4(Base Project Allocation - $2,500,000)

 

5(Design & Contingencies - $500,000)

 

6(xxviii) York Readiness Center, York County

 

7(A) Rehabilitate York Readiness Center,
8including assembly hall, classrooms,
9administrative offices, storage space,
10restrooms, locker rooms and mechanical
11rooms; upgrade building systems (HVAC,
12roofs, windows, doors); repair façade;
13expand parking; and construct unheated
14storage space

 

15Project Allocation

2,400,000

16(Base Project Allocation - $2,000,000)

 

17(Design & Contingencies - $400,000)

 

18(10) Department of Public Welfare

 

19(i) Clarks Summit State Hospital

 

20(A) Replace all G & W oil switches and
21high voltage lines throughout facility
22and install new generators at
23Buildings 2 and 7, including new 200-
24amp service

 

25Project Allocation

5,000,000

26(Base Project Allocation - $4,300,000)

 

27(Design & Contingencies - $700,000)

 

28(B) Upgrade fire alarm and fire
29suppression system throughout facility

 

30Project Allocation

2,800,000

1(Base Project Allocation - $2,520,000)

 

2(Design & Contingencies - $280,000)

 

3(C) Replace boilers

 

4Project Allocation

4,200,000

5(Base Project Allocation - $3,780,000)

 

6(Design & Contingencies - $420,000)

 

7(ii) Cresson Secure Treatment Unit

 

8(A) Construct multipurpose modular
9building for classroom and gym use

 

10Project Allocation

3,000,000

11(Base Project Allocation - $2,500,000)

 

12(Design & Contingencies - $500,000)

 

13(iii) Danville State Hospital

 

14(A) Replace tower roof and flat roof of
15Building I

 

16Project Allocation

750,000

17(Base Project Allocation - $650,000)

 

18(Design & Contingencies - $100,000)

 

19(B) Replace roofs on various buildings

 

20Project Allocation

1,800,000

21(Base Project Allocation - $1,620,000)

 

22(Design & Contingencies - $180,000)

 

23(iv) Ebensburg Center

 

24(A) Replace, install and upgrade air
25conditioning to various hallways,
26corridors, day activity rooms, and
27dining areas in five residential units

 

28Project Allocation

500,000

29(Base Project Allocation - $388,000)

 

30(Design & Contingencies - $112,000)

 

1(B) Upgrade fire alarm and fire
2suppression system throughout facility

 

3Project Allocation

2,200,000

4(Base Project Allocation - $1,980,000)

 

5(Design & Contingencies - $220,000)

 

6(C) Replace current HVAC

 

7Project Allocation

3,500,000

8(Base Project Allocation - $3,150,000)

 

9(Design & Contingencies - $350,000)

 

10(iv.1) Hamburg Center

 

11(A) Demolish and remediate obsolete
12boiler plant building

 

13Project Allocation

1,000,000

14(Base Project Allocation - $900,000)

 

15(Design & Contingencies - $100,000)

 

16(v) Loysville Youth Development Center

 

17(A) Replace fire lines and pumps and
18install new fire sprinklers in
19Building 10

 

20Project Allocation

1,800,000

21(Base Project Allocation - $1,500,000)

 

22(Design & Contingencies - $300,000)

 

23(B) Upgrade and replace HVAC equipment
24throughout facility to meet current
25ventilation codes

 

26Project Allocation

3,000,000

27(Base Project Allocation - $2,700,000)

 

28(Design & Contingencies - $300,000)

 

29(vi) (Reserved)

 

30(vii) Norristown State Hospital

 

1(A) Demolish vacant and deteriorated
2buildings considered a nuisance and
3hazard

 

4Project Allocation

1,000,000

5(Base Project Allocation - $900,000)

 

6(Design & Contingencies - $100,000)

 

7(B) Upgrade and replace HVAC equipment
8throughout facility to meet current
9ventilation codes

 

10Project Allocation

5,000,000

11(Base Project Allocation - $4,500,000)

 

12(Design & Contingencies - $500,000)

 

13(viii) North Central Secure Treatment Unit

 

14(A) Construct multipurpose modular
15building for classroom and gym use

 

16Project Allocation

5,400,000

17(Base Project Allocation - $4,500,000)

 

18(Design & Contingencies - $900,000)

 

19(B) Replace existing standard glass
20windows with new security-type
21shatterproof glass windows for health
22and safety issues

 

23Project Allocation

600,000

24(Base Project Allocation - $540,000)

 

25(Design & Contingencies - $60,000)

 

26(C) Replace current HVAC to meet code
27requirements

 

28Project Allocation

9,000,000

29(Base Project Allocation - $8,100,000)

 

30(Design & Contingencies - $900,000)

 

1(viii.1) Philipsburg State Hospital

 

2(A) Demolish and remediate all campus
3buildings

 

4Project Allocation

6,000,000

5(Base Project Allocation - $5,400,000)

 

6(Design & Contingencies - $600,000)

 

7(ix) Polk Center

 

8(A) Remove and replace water plant

 

9Project Allocation

2,500,000

10(Base Project Allocation - $2,500,000)

 

11(B) Repair all mortar joints between
12brick and seal all brick and mortar
13joints

 

14Project Allocation

2,500,000

15(Base Project Allocation - $2,250,000)

 

16(Design & Contingencies - $250,000)

 

17(C) Upgrade fire alarm and fire
18suppression system throughout facility

 

19Project Allocation

1,800,000

20(Base Project Allocation - $1,620,000)

 

21(Design & Contingencies - $180,000)

 

22(x) Selinsgrove Center

 

23(A) Reseal joints and renovate lighting
24and drainage systems in steam tunnels
25between power plant and central
26building complex

 

27Project Allocation

550,000

28(Base Project Allocation - $475,000)

 

29(Design & Contingencies - $75,000)

 

30(B) Upgrade fire alarm and fire

 

1suppression system throughout facility

 

2Project Allocation

2,700,000

3(Base Project Allocation - $2,430,000)

 

4(Design & Contingencies - $270,000)

 

5(C) Funding for DGS Project 553-34
6relating to portable water

 

7Project Allocation

3,500,000

8(Base Project Allocation - $3,150,000)

 

9(Design & Contingencies - $350,000)

 

10(xi) South Mountain Restoration Center

 

11(A) Provide for breech of Carbarough Dam
12and land restoration to protect
13property and life as mandated by
14Department of Environmental Protection

 

15Project Allocation

3,500,000

16(Base Project Allocation - $3,150,000)

 

17(Design & Contingencies - $350,000)

 

18(xii) Torrance State Hospital

 

19(A) Replace existing wastewater treatment
20plant to comply with current
21regulations and codes

 

22Project Allocation

4,500,000

23(Base Project Allocation - $4,200,000)

 

24(Design & Contingencies - $300,000)

 

25(B) Additional funds for construction and
26replacement of existing wastewater
27treatment plant

 

28Project Allocation

2,000,000

29(Base Project Allocation - $2,000,000)

 

30(xiii) Warren State Hospital

 

1(A) Upgrade medium-voltage and low-
2voltage electrical gear throughout
3facility

 

4Project Allocation

4,000,000

5(Base Project Allocation - $3,600,000)

 

6(Design & Contingencies - $400,000)

 

7(xiii.1) Wernersville State Hospital

 

8(A) Replace boiler

 

9Project Allocation

1,500,000

10(Base Project Allocation - $1,350,000)

 

11(Design & Contingencies - $150,000)

 

12(xiv) White Haven Center

 

13(A) Upgrade fire alarm and fire
14suppression system throughout facility

 

15Project Allocation

2,100,000

16(Base Project Allocation - $1,890,000)

 

17(Design & Contingencies - $210,000)

 

18(B) Upgrade existing facility to comply
19with current emission requirements

 

20Project Allocation

5,500,000

21(Base Project Allocation - $4,950,000)

 

22(Design & Contingencies - $550,000)

 

23(C) Upgrade existing medium-voltage
24distribution system

 

25Project Allocation

5,000,000

26(Base Project Allocation - $4,500,000)

 

27(Design & Contingencies - $500,000)

 

28(xv) Youth Forestry Camp No. 2

 

29(A) Demolish existing building and
30construct new medical building

 

1Project Allocation

750,000

2(Base Project Allocation - $675,000)

 

3(Design & Contingencies - $75,000)

 

4(xvi) Youth Forestry Camp No. 3

 

5(A) Install HVAC

 

6Project Allocation

700,000

7(Base Project Allocation - $630,000)

 

8(Design & Contingencies - $70,000)

 

9(11) Pennsylvania State Police

 

10(i) DNA Laboratory, Westmoreland County

 

11(A) Construct new DNA laboratory in
12Greensburg to meet requirements and
13codes

 

14Project Allocation

29,000,000

15(Base Project Allocation - 22,500,000)

 

16(Land Allocation - $1,500,000)

 

17(Design & Contingencies - $5,000,000)

 

18(ii) Greensburg Headquarters, Westmoreland
19County

 

20(A) Design and construction of new
21headquarters facility

 

22Project Allocation

9,264,000

23(Base Project Allocation - $7,720,000)

 

24(Design & Contingencies - $1,544,000)

 

<-25(iii) Academy Complex, Derry Township,
26Dauphin County

 

27(A) Construction and other related costs
28for renovations to Pennsylvania State
29Police Academy Complex

 

30Project Allocation

8,164,000

1(Base Project Allocation - $7,220,000)

 

2(Design & Contingencies - $944,000)

 

<-3(iv) Erie Headquarters, Erie County

 

4(A) Additional funding for construction
5of new headquarters facility, garage,
6crime lab and aviation hangar to
7replace existing owned and leased
8facilities

 

9Project Allocation

6,000,000

10(Base Project Allocation - $6,000,000)

 

11(12) State System of Higher Education

 

12(i) Bloomsburg University

 

13(A) Construct facilities complex to
14centralize facilities management
15functions into single complex of
16buildings

 

17Project Allocation

19,000,000

18(Base Project Allocation -
19$15,200,000)

 

20(Design & Contingencies - $3,800,000)

 

21(ii) Cheyney University

 

22(A) Completely renovate Coppin Hall
23Building

 

24Project Allocation

9,000,000

25(Base Project Allocation - $7,200,000)

 

26(Design & Contingencies - $1,800,000)

 

27(B) Construction, infrastructure and
28other related costs for the design and
29construction of dormitory

 

30Project Allocation

12,000,000

1(Base Project Allocation -
2$10,000,000)

 

3(Design & Contingencies - $2,000,000)

 

4(C) Renovate Cope Athletic Complex and
5supporting academic spaces

 

6Project Allocation

10,000,000

7(Base Project Allocation - $8,000,000)

 

8(Design & Contingencies - $2,000,000)

 

<-9(D) Additional funding to construct new
10student housing

 

11Project Allocation

500,000

12(Base Project Allocation - $500,000)

 

13(iii) East Stroudsburg University

 

14(A) Completely renovate Kemp Library
15Building

 

16Project Allocation

45,000,000

17(Base Project Allocation -
18$36,000,000)

 

19(Design & Contingencies - $9,000,000)

 

20(iii.1) Edinboro University

 

<-21(A) Rehabilitate existing facility to
22house precision tool and mold design
23classrooms in Porreco Center

 

24Project Allocation

1,000,000

25(Base Project Allocation - $1,000,000)

 

<-26(A) Rehabilitate and renovate Porreco
27Center

 

28Project Allocation

5,000,000

29(Base Project Allocation - $5,000,000)

 

30(iv) Indiana University of Pennsylvania

 

1(A) Additional funding for renovation of
2Stapleton/Stabley Library, including
3space reconfiguration

 

4Project Allocation

14,500,000

5(Base Project Allocation -
6$11,600,000)

 

7(Design & Contingencies - $2,900,000)

 

8(v) Kutztown University

 

9(A) Additional funding for renovation of
10Beecky Education Building, including
11infrastructure

 

12Project Allocation

9,000,000

13(Base Project Allocation - $7,200,000)

 

14(Design & Contingencies - $1,800,000)

 

15(B) Renovate DeFrancesco Building
16interior

 

17Project Allocation

5,000,000

18(Base Project Allocation - $5,000,000)

 

19(vi) Lock Haven University

 

20(A) Renovate and upgrade campus
21electrical infrastructure to meet
22modern demands and efficiencies

 

23Project Allocation

16,000,000

24(Base Project Allocation -
25$12,800,000)

 

26(Design & Contingencies - $3,200,000)

 

27(B) Additional funding for renovation of
28South Ulmer Hall, including
29infrastructure converting from science
30to general classroom

 

1Project Allocation

23,000,000

2(Base Project Allocation -
3$18,400,000)

 

4(Design & Contingencies - $4,600,000)

 

5(C) Renovate Russell Hall, including
6infrastructure

 

7Project Allocation

15,000,000

8(Base Project Allocation -
9$12,000,000)

 

10(Design & Contingencies - $3,000,000)

 

<-11(D) Construction and other related costs
12for renovation of office building

 

13Project Allocation

10,000,000

14(Base Project Allocation -
15$10,000,000)

 

16(vii) Mansfield University

 

17(A) Renovate Belknap and Retan Halls to
18provide better functionality and space
19usage

 

20Project Allocation

10,000,000

21(Base Project Allocation - $8,000,000)

 

22(Design & Contingencies - $2,000,000)

 

23(B) Expand Butler Music Center, including
24infrastructure

 

25Project Allocation

8,000,000

26(Base Project Allocation - $6,400,000)

 

27(Design & Contingencies - $1,600,000)

 

28(C) Reroute Morris Drive

 

29Project Allocation

6,000,000

30(Base Project Allocation - $4,800,000)

 

1(Design & Contingencies - $1,200,000)

 

2(D) Demolish Maple Hall and construct new
3parking lot

 

4Project Allocation

6,000,000

5(Base Project Allocation - $4,800,000)

 

6(Design & Contingencies - $1,200,000)

 

7(E) Upgrade utilities and infrastructure
8campuswide and replace outdated
9systems

 

10Project Allocation

10,000,000

11(Base Project Allocation - $8,000,000)

 

12(Design & Contingencies - $2,000,000)

 

13(viii) Millersville University

 

14(A) Completely renovate Pucillo Hall,
15including infrastructure

 

16Project Allocation

7,000,000

17(Base Project Allocation - $5,600,000)

 

18(Design & Contingencies - $1,400,000)

 

19(B) Completely renovate Brooks Hall into
20health and wellness center

 

21Project Allocation

15,000,000

22(Base Project Allocation -
23$12,000,000)

 

24(Design & Contingencies - $3,000,000)

 

25(ix) Shippensburg University

 

26(A) Additional funding for renovation of
27Franklin Science Center

 

28Project Allocation

25,000,000

29(Base Project Allocation -
30$20,000,000)

 

1(Design & Contingencies - $5,000,000)

 

2(B) Additional funding for replacement of
3Henderson Hall

 

4Project Allocation

11,000,000

5(Base Project Allocation - $8,800,000)

 

6(Design & Contingencies - $2,200,000)

 

7(ix.1) Slippery Rock University

 

<-8(A) Renovate, demolish and construct an
9addition, including infrastructure to
10McKay Building

 

11Project Allocation

1,000,000

12(Base Project Allocation - $1,000,000)

 

<-13(A) Additional funding for renovation and
14addition to McKay Building

 

15Project Allocation

1,000,000

16(Base Project Allocation - $1,000,000)

 

17(x) West Chester University

 

18(A) Additional funding for renovation of
19Sturzebecker Health Science Center,
20including new addition

 

21Project Allocation

13,000,000

22(Base Project Allocation -
23$10,400,000)

 

24(Design & Contingencies - $2,600,000)

 

25(B) Construct new athletics facility,
26approximately 85,000 square feet

 

27Project Allocation

15,000,000

28(Base Project Allocation -
29$12,000,000)

 

30(Design & Contingencies - $3,000,000)

 

1(C) Renovate the Sturzebecker Health
2Science Center

 

3Project Allocation

20,000,000

4(Base Project Allocation -
5$16,000,000)

 

6(Design & Contingencies - $4,000,000)

 

7(13) Department of Transportation

 

8(i) Adams County

 

9(A) Construct new vehicle wash building
10at Adams County Maintenance Garage

 

11Project Allocation

690,000

12(Base Project Allocation - $600,000)

 

13(Design & Contingencies - $90,000)

 

14(B) Develop new stockpile facility in
15Adams County, including site purchase,
16design and construction

 

17Project Allocation

2,220,000

18(Base Project Allocation - $2,000,000)

 

19(Land Allocation - $20,000)

 

20(Design & Contingencies - $200,000)

 

21(C) Renovate and expand current Adams
22County Maintenance Garage, including
23roof replacement and building systems
24upgrade

 

25Project Allocation

2,500,000

26(Base Project Allocation - $2,200,000)

 

27(Design & Contingencies - $300,000)

 

28(D) Develop new stockpile, including site
29purchase, design and construction

 

30Project Allocation

3,000,000

1(Base Project Allocation - $1,750,000)

 

2(Land Allocation - $750,000)

 

3(Design & Contingencies - $500,000)

 

4(E) Construct four new storage buildings
5and site work at various stockpiles

 

6Project Allocation

1,400,000

7(Base Project Allocation - $1,190,000)

 

8(Design & Contingencies - $210,000)

 

9(F) Demolish and construct two new salt
10storage buildings and site work at
11Adams County Maintenance Stockpile

 

12Project Allocation

400,000

13(Base Project Allocation - $350,000)

 

14(Design & Contingencies - $50,000)

 

15(ii) Allegheny County

 

16(A) Renovate Allegheny County District
1711-0 Office, including roof,
18infrastructure, energy efficiencies
19and program requirements

 

20Project Allocation

2,200,000

21(Base Project Allocation - $2,000,000)

 

22(Design & Contingencies - $200,000)

 

23(B) Renovate Allegheny County Maintenance
24Garage, including roof,
25infrastructure, energy efficiencies
26and program requirements

 

27Project Allocation

825,000

28(Base Project Allocation - $750,000)

 

29(Design & Contingencies - $75,000)

 

30(C) Construct new PM/service/line paint

 

1building at the Neville Island
2Stockpile Facility

 

3Project Allocation

775,000

4(Base Project Allocation - $700,000)

 

5(Design & Contingencies - $75,000)

 

6(D) Construct new service/PM building at
7Fort Pitt Tunnel Facility to meet
8program requirements

 

9Project Allocation

3,850,000

10(Base Project Allocation - $3,500,000)

 

11(Design & Contingencies - $350,000)

 

12(E) Replace electric generators and
13remove existing roof systems at Fort
14Pitt, Liberty and Squirrel Hill Tunnel
15Facilities

 

16Project Allocation

3,350,000

17(Base Project Allocation - $3,000,000)

 

18(Design & Contingencies - $350,000)

 

19(F) Demolish and construct new salt
20storage buildings and site work at
21Allegheny County Maintenance Stockpile

 

22Project Allocation

2,400,000

23(Base Project Allocation - $2,100,000)

 

24(Design & Contingencies - $300,000)

 

25(G) Renovate and expand Rest Site 11,
26including roof replacement, upgrade
27building systems, sidewalks, curbing,
28step replacement, parking lot upgrades
29and sewage plant upgrades

 

30Project Allocation

2,000,000

1(Base Project Allocation - $1,800,000)

 

2(Design & Contingencies - $200,000)

 

3(H) Renovate and expand Rest Site 12,
4including roof replacement, upgrade
5building systems, sidewalks, curbing,
6step replacement, parking lot upgrades
7and sewage plant upgrades

 

8Project Allocation

2,000,000

9(Base Project Allocation - $1,800,000)

 

10(Design & Contingencies - $200,000)

 

11(I) Renovate and expand Allegheny County
12Driver Licensing Center, including
13roof replacement, upgrade building
14systems, sidewalks, curbing, step
15replacement, parking lot upgrades and
16sewage plant upgrades

 

17Project Allocation

1,400,000

18(Base Project Allocation - $1,250,000)

 

19(Design & Contingencies - $150,000)

 

20(J) Renovate and expand Allegheny County
21Maintenance Garage, including roof
22replacement, building systems upgrade
23and energy efficiency improvement

 

24Project Allocation

3,500,000

25(Base Project Allocation - $3,000,000)

 

26(Design & Contingencies - $500,000)

 

27(K) Construct new maintenance garage at
28Liberty Tunnels Facility

 

29Project Allocation

3,750,000

30(Base Project Allocation - $3,250,000)

 

1(Design & Contingencies - $500,000)

 

2(ii.1) Armstrong County

 

3(A) Demolish and construct new salt
4storage buildings and site work at
5Armstrong County Maintenance Stockpile

 

6Project Allocation

800,000

7(Base Project Allocation - $700,000)

 

8(Design & Contingencies - $100,000)

 

9(iii) Beaver County

 

10(A) Construct new PM/service/line paint
11building at Beaver County Maintenance
12Facility

 

13Project Allocation

775,000

14(Base Project Allocation - $700,000)

 

15(Design & Contingencies - $75,000)

 

16(B) Remove and replace roof system at
17Beaver County Maintenance Facility

 

18Project Allocation

525,000

19(Base Project Allocation - $450,000)

 

20(Design & Contingencies - $75,000)

 

21(C) Construct new PM building at Beaver
22County Maintenance Facility

 

23Project Allocation

1,100,000

24(Base Project Allocation - $1,000,000)

 

25(Design & Contingencies - $100,000)

 

26(D) Remove and replace HVAC system and
27wall installation at Beaver County
28Maintenance Office

 

29Project Allocation

1,150,000

30(Base Project Allocation - $1,000,000)

 

1(Design & Contingencies - $150,000)

 

2(E) Demolish and construct two new salt
3storage buildings and site work at
4Beaver County Maintenance Stockpile

 

5Project Allocation

800,000

6(Base Project Allocation - $700,000)

 

7(Design & Contingencies - $100,000)

 

8(F) Renovate and expand Beaver County
9Driver Licensing Center, including
10roof replacement, upgrade building
11systems, sidewalks, curbing, step
12replacement, parking lot upgrades and
13sewage plant upgrades

 

14Project Allocation

1,400,000

15(Base Project Allocation - $1,250,000)

 

16(Design & Contingencies - $150,000)

 

17(G) Renovate and expand Beaver County
18Maintenance Garage, including roof
19replacement, upgrade building systems
20and improve energy efficiency

 

21Project Allocation

3,600,000

22(Base Project Allocation - $3,250,000)

 

23(Design & Contingencies - $350,000)

 

<-24(H) Construction and other related costs
25for Hereford Manor dams

 

26Project Allocation

7,500,000

27(Base Project Allocation - $7,500,000)

 

28(iii.1) Bedford County

 

29(A) Develop new stockpile, including site
30purchase, design and construction

 

1Project Allocation

3,000,000

2(Base Project Allocation - $1,750,000)

 

3(Land Allocation - $750,000)

 

4(Design & Contingencies - $500,000)

 

5(B) Demolish and construct new salt
6storage buildings and site work at
7Bedford County Maintenance Stockpile

 

8Project Allocation

1,200,000

9(Base Project Allocation - $1,050,000)

 

10(Design & Contingencies - $150,000)

 

11(C) Construct new maintenance garage,
12including salt storage buildings,
13auxiliary buildings, site work and
14land acquisition

 

15Project Allocation

15,000,000

16(Base Project Allocation -
17$11,750,000)

 

18(Land Allocation - $1,000,000)

 

19(Design & Contingencies - $2,250,000)

 

20(D) Renovate and expand current county
21maintenance garage, including roof
22replacement, building systems upgrade
23and energy efficiency improvement

 

24Project Allocation

2,500,000

25(Base Project Allocation - $2,125,000)

 

26(Design & Contingencies - $375,000)

 

27(iv) Berks County

 

28(A) Construct new vehicle wash building
29at Berks County Maintenance Garage

 

30Project Allocation

690,000

1(Base Project Allocation - $600,000)

 

2(Design & Contingencies - $90,000)

 

3(B) Reskin metal building at Berks County
4Maintenance Facility

 

5Project Allocation

350,000

6(Base Project Allocation - $300,000)

 

7(Design & Contingencies - $50,000)

 

8(C) Renovate and expand Berks County
9Maintenance Garage, including roof
10replacement, building systems upgrade
11and energy efficiency improvement

 

12Project Allocation

2,000,000

13(Base Project Allocation - $1,700,000)

 

14(Design & Contingencies - $300,000)

 

15(iv.1) Blair County

 

16(A) Renovate and expand District Office
179-0, including roof replacement and
18building systems upgrade

 

19Project Allocation

2,000,000

20(Base Project Allocation - $1,700,000)

 

21(Design & Contingencies - $300,000)

 

22(B) Renovate and expand Blair County
23Maintenance Facility, including roof
24replacement and building systems
25upgrade

 

26Project Allocation

2,500,000

27(Base Project Allocation - $2,125,000)

 

28(Design & Contingencies - $375,000)

 

29(C) Design and construction of new
30district bridge slab building and site

 

1work at Blair County Maintenance
2Facility

 

3Project Allocation

350,000

4(Base Project Allocation - $300,000)

 

5(Design & Contingencies - $50,000)

 

6(D) Demolish and construct new salt
7storage building, including site work
8at Blair County Maintenance Facility

 

9Project Allocation

400,000

10(Base Project Allocation - $350,000)

 

11(Design & Contingencies - $50,000)

 

12(iv.2) Bradford County

 

13(A) Develop new stockpile facility,
14including site purchase, design and
15construction

 

16Project Allocation

3,000,000

17(Base Project Allocation - $1,750,000)

 

18(Land Allocation - $750,000)

 

19(Design & Contingencies - $500,000)

 

20(B) Demolish and construct new storage
21buildings and site work at various
22stockpiles at Bradford County
23Stockpile Facility

 

24Project Allocation

400,000

25(Base Project Allocation - $350,000)

 

26(Design & Contingencies - $50,000)

 

27(C) Demolish and construct new salt
28storage building and site work

 

29Project Allocation

5,000,000

30(Base Project Allocation - $4,500,000)

 

1(Design & Contingencies - $500,000)

 

2(D) Renovate and expand Bradford County
3Maintenance Garage, including roof
4replacement, building systems upgrade
5and energy efficiency improvement

 

6Project Allocation

2,000,000

7(Base Project Allocation - $1,700,000)

 

8(Design & Contingencies - $300,000)

 

9(iv.3) Bucks County

 

10(A) Construct new salt storage buildings
11and site work at Bucks County
12Maintenance Facility

 

13Project Allocation

1,600,000

14(Base Project Allocation - $1,400,000)

 

15(Design & Contingencies - $200,000)

 

16(B) Renovate and expand Welcome Center
17Site P, including roof replacement,
18building systems upgrade, sidewalks,
19curbing, step replacement, parking lot
20upgrades and sewage plant upgrades

 

21Project Allocation

1,050,000

22(Base Project Allocation - $1,000,000)

 

23(Design & Contingencies - $50,000)

 

24(iv.4) Cambria County

 

25(A) Develop new stockpile, including site
26purchase, design and construction

 

27Project Allocation

3,000,000

28(Base Project Allocation - $1,750,000)

 

29(Land Allocation - $750,000)

 

30(Design & Contingencies - $500,000)

 

1(B) Develop new stockpile, including site
2purchase, design and construction

 

3Project Allocation

3,000,000

4(Base Project Allocation - $1,750,000)

 

5(Land Allocation - $750,000)

 

6(Design & Contingencies - $500,000)

 

7(C) Demolish and construct new salt
8storage buildings and site work at
9Fulton County Maintenance Stockpile

 

10Project Allocation

800,000

11(Base Project Allocation - $720,000)

 

12(Design & Contingencies - $80,000)

 

13(D) Renovate and expand Cambria County
14Driver Licensing Center, including
15roof replacement, building systems
16upgrade, sidewalks, curbing, step
17replacement, parking lot upgrades and
18sewage plant upgrades

 

19Project Allocation

1,400,000

20(Base Project Allocation - $1,250,000)

 

21(Design & Contingencies - $150,000)

 

22(E) Renovate and expand Cambria County
23Maintenance Garage, including roof
24replacement, building systems upgrade
25and energy efficiency improvement

 

26Project Allocation

2,000,000

27(Base Project Allocation - $1,700,000)

 

28(Design & Contingencies - $300,000)

 

29(iv.5) Cameron County

 

30(A) Construct new county maintenance

 

1garage, including salt storage
2buildings, auxiliary buildings, site
3work and acquisition of land at
4Cameron County Maintenance Garage

 

5Project Allocation

15,000,000

6(Base Project Allocation -
7$11,775,000)

 

8(Land Allocation - $1,000,000)

 

9(Design & Contingencies - $2,225,000)

 

10(B) Renovate and expand current Cameron
11County Maintenance Garage, including
12roof replacement and building systems
13upgrade

 

14Project Allocation

2,000,000

15(Base Project Allocation - $1,700,000)

 

16(Design & Contingencies - $300,000)

 

17(iv.6) Carbon County

 

18(A) Construct new salt storage building
19and site work at Carbon County
20Maintenance Facility

 

21Project Allocation

400,000

22(Base Project Allocation - $350,000)

 

23(Design & Contingencies - $50,000)

 

24(B) Demolish and construct satellite
25office and garage at Hudsondale
26Stockpile

 

27Project Allocation

2,300,000

28(Base Project Allocation - $1,970,000)

 

29(Design & Contingencies - $30,000)

 

30(C) Renovate and expand Carbon County

 

1Maintenance Garage, including roof
2replacement, building systems upgrade
3and energy efficiency improvement

 

4Project Allocation

2,000,000

5(Base Project Allocation - $1,700,000)

 

6(Design & Contingencies - $300,000)

 

7(iv.7) Centre County

 

8(A) Renovate and expand current Centre
9County Maintenance Garage, including
10roof replacement and buildings systems
11upgrade

 

12Project Allocation

2,000,000

13(Base Project Allocation - $1,700,000)

 

14(Design & Contingencies - $300,000)

 

15(B) Renovate and expand County Rest Site
1629, including roof replacement,
17building systems upgrade, sidewalks,
18curbing, step replacement, parking lot
19upgrades and sewage plant upgrades

 

20Project Allocation

2,000,000

21(Base Project Allocation - $1,800,000)

 

22(Design & Contingencies - $200,000)

 

23(C) Renovate and expand County Rest Site
2430, including roof replacement,
25building systems upgrade, sidewalks,
26curbing, step replacement, parking lot
27upgrades and sewage plant upgrades

 

28Project Allocation

2,000,000

29(Base Project Allocation - $1,800,000)

 

30(Design & Contingencies - $200,000)

 

1(D) Renovate and expand Centre County
2Driver Licensing Center, including
3roof replacement, building systems
4upgrade, sidewalks, curbing, step
5replacement, parking lot upgrades and
6sewage plant upgrades

 

7Project Allocation

1,400,000

8(Base Project Allocation - $1,250,000)

 

9(Design & Contingencies - $150,000)

 

10(iv.8) Chester County

 

11(A) Construct new salt storage building
12and site work at Chester County
13Maintenance Facility

 

14Project Allocation

350,000

15(Base Project Allocation - $300,000)

 

16(Design & Contingencies - $50,000)

 

17(B) Construct new salt storage buildings
18and site work at Chester County
19Maintenance Facility

 

20Project Allocation

1,600,000

21(Base Project Allocation - $1,400,000)

 

22(Design & Contingencies - $200,000)

 

23(iv.9) Clarion County

 

24(A) Renovate and expand Clarion County
25Maintenance Garage, including roof
26replacement, building systems upgrade
27and energy efficiency improvement

 

28Project Allocation

1,900,000

29(Base Project Allocation - $1,700,000)

 

30(Design & Contingencies - $200,000)

 

1(iv.10) Clearfield County

 

2(A) Renovate and expand current
3Clearfield County Maintenance Garage,
4including roof replacement and
5building systems upgrades

 

6Project Allocation

2,000,000

7(Base Project Allocation - $1,700,000)

 

8(Design & Contingencies - $300,000)

 

9(B) Construct new salt storage buildings
10at Clearfield County Stockpile
11Facility

 

12Project Allocation

400,000

13(Base Project Allocation - $350,000)

 

14(Design & Contingencies - $50,000)

 

15(iv.11) Clinton County

 

16(A) Construct new salt storage buildings
17at Clinton County Stockpile Facility

 

18Project Allocation

800,000

19(Base Project Allocation - $700,000)

 

20(Design & Contingencies - $100,000)

 

21(B) Renovate and expand Rest Site 33,
22including roof replacement, building
23systems upgrade, sidewalks, curbing,
24step replacement, parking lot upgrades
25and sewage plant upgrades

 

26Project Allocation

2,000,000

27(Base Project Allocation - $1,800,000)

 

28(Design & Contingencies - $200,000)

 

29(C) Renovate and expand Rest Site 34,
30including roof replacement, building

 

1systems upgrade, sidewalks, curbing,
2step replacement, parking lot upgrades
3and sewage plant upgrades

 

4Project Allocation

2,000,000

5(Base Project Allocation - $1,800,000)

 

6(Design & Contingencies - $200,000)

 

7(iv.12) Columbia County

 

8(A) Renovate and expand Rest Site 37,
9including roof replacement, building
10systems upgrade, sidewalks, curbing,
11step replacement, parking lot upgrades
12and sewage plant upgrades

 

13Project Allocation

2,000,000

14(Base Project Allocation - $1,800,000)

 

15(Design & Contingencies - $200,000)

 

16(B) Renovate and expand Rest Site 38,
17including roof replacement, building
18systems upgrade, sidewalks, curbing,
19step replacement, parking lot upgrades
20and sewage plant upgrades

 

21Project Allocation

2,000,000

22(Base Project Allocation - $1,800,000)

 

23(Design & Contingencies - $200,000)

 

24(C) Renovate and expand current Columbia
25County Maintenance Garage, including
26roof replacement and building systems
27upgrade

 

28Project Allocation

2,000,000

29(Base Project Allocation - $1,700,000)

 

30(Design & Contingencies - $300,000)

 

1(D) Construction of new Columbia County
2Maintenance Garage, including salt
3storage buildings, auxiliary
4buildings, site work and land
5acquisition

 

6Project Allocation

15,000,000

7(Base Project Allocation -
8$11,750,000)

 

9(Land Allocation - $1,000,000)

 

10(Design & Contingencies - $2,250,000)

 

11(E) Construct new salt storage buildings
12at Columbia County Stockpile Facility

 

13Project Allocation

800,000

14(Base Project Allocation - $700,000)

 

15(Design & Contingencies - $100,000)

 

16(iv.13) Crawford County

 

17(A) Demolish and construct new storage
18buildings and site work at various
19stockpiles at Crawford County
20Maintenance Facility

 

21Project Allocation

350,000

22(Base Project Allocation - $298,000)

 

23(Design & Contingencies - $52,000)

 

24(B) Renovate and expand County Rest Site
2519, including roof replacement,
26building systems upgrade, sidewalks,
27curbing, step replacement, parking lot
28upgrades and sewage plant upgrades

 

29Project Allocation

2,500,000

30(Base Project Allocation - $2,200,000)

 

1(Design & Contingencies - $300,000)

 

2(C) Renovate and expand County Rest Site
320, including roof replacement,
4building systems upgrade, sidewalks,
5curbing, step replacement, parking lot
6upgrades and sewage plant upgrades

 

7Project Allocation

2,500,000

8(Base Project Allocation - $2,200,000)

 

9(Design & Contingencies - $300,000)

 

10(D) Renovate and expand Crawford County
11Driver Licensing Center, including
12roof replacement, building systems
13upgrade, sidewalks, curbing, step
14replacement, parking lot upgrades and
15sewage plant upgrades

 

16Project Allocation

1,400,000

17(Base Project Allocation - $1,250,000)

 

18(Design & Contingencies - $150,000)

 

19(E) Renovate and expand Crawford County
20Maintenance Garage, including roof
21replacement, building systems upgrade
22and energy efficiency improvement

 

23Project Allocation

2,500,000

24(Base Project Allocation - $2,125,000)

 

25(Design & Contingencies - $375,000)

 

26(iv.14) Cumberland County

 

27(A) Demolish and construct two new salt
28storage buildings and site work at
29Cumberland County Maintenance
30Stockpile

 

1Project Allocation

800,000

2(Base Project Allocation - $700,000)

 

3(Design & Contingencies - $100,000)

 

4(B) Renovate and expand Rest Site 45,
5including roof replacement, building
6systems upgrade, sidewalks, curbing,
7step replacement, parking lot upgrades
8and sewage plant upgrades

 

9Project Allocation

2,000,000

10(Base Project Allocation - $1,800,000)

 

11(Design & Contingencies - $200,000)

 

12(C) Renovate and expand Rest Site 46,
13including roof replacement, building
14systems upgrade, sidewalks, curbing,
15step replacement, parking lot upgrades
16and sewage plant upgrades

 

17Project Allocation

2,000,000

18(Base Project Allocation - $1,800,000)

 

19(Design & Contingencies - $200,000)

 

20(v) Dauphin County

 

21(A) Construct new vehicle wash building
22at Dauphin County Maintenance Garage

 

23Project Allocation

690,000

24(Base Project Allocation - $600,000)

 

25(Design & Contingencies - $90,000)

 

26(B) Develop new stockpile facility in
27Dauphin County, including site
28purchase, design and construction

 

29Project Allocation

2,220,000

30(Base Project Allocation - $2,000,000)

 

1(Land Allocation - $20,000)

 

2(Design & Contingencies - $200,000)

 

3(C) Construct new vehicle wash building
4at Dauphin County Maintenance Garage
5Stockpile 02 in Elizabethville

 

6Project Allocation

690,000

7(Base Project Allocation - $600,000)

 

8(Design & Contingencies - $90,000)

 

9(D) Renovate and expand District Office
108-0, including roof replacement and
11building systems upgrade

 

12Project Allocation

2,000,000

13(Base Project Allocation - $1,700,000)

 

14(Design & Contingencies - $300,000)

 

15(E) Renovate and expand current Dauphin
16County Maintenance Garage, including
17roof replacement and building systems
18upgrade

 

19Project Allocation

2,500,000

20(Base Project Allocation - $2,125,000)

 

21(Design & Contingencies - $375,000)

 

22(F) Demolish and construct two new salt
23storage buildings and site work at
24Dauphin County Maintenance Stockpile

 

25Project Allocation

800,000

26(Base Project Allocation - $700,000)

 

27(Design & Contingencies - $100,000)

 

28(G) Renovation and expansion of Dauphin
29County Sign Shop, including roof
30replacement and building systems

 

1upgrade

 

2Project Allocation

2,500,000

3(Base Project Allocation - $2,200,000)

 

4(Design & Contingencies - $300,000)

 

5(H) Renovate and expand Dauphin County
6Fleet Management Facility, including
7roof replacement and building systems
8upgrade

 

9Project Allocation

3,500,000

10(Base Project Allocation - $3,100,000)

 

11(Design & Contingencies - $400,000)

 

12(vi) Delaware County

 

13(A) Develop new stockpile facility in
14Delaware County, including site
15purchase, design and construction

 

16Project Allocation

2,220,000

17(Base Project Allocation - $2,000,000)

 

18(Land Allocation - $20,000)

 

19(Design & Contingencies - $200,000)

 

20(B) Construct new salt storage buildings
21and site work at Delaware County
22Maintenance Facility

 

23Project Allocation

800,000

24(Base Project Allocation - $700,000)

 

25(Design & Contingencies - $100,000)

 

26(C) Renovate and expand Welcome Center
27Site P, including roof replacement,
28building systems upgrade, sidewalks,
29curbing, step replacement, parking lot
30upgrades and sewage plant upgrades

 

1Project Allocation

1,050,000

2(Base Project Allocation - $1,000,000)

 

3(Design & Contingencies - $50,000)

 

4(D) Renovate and expand Delaware County
5Maintenance Garage, including roof
6replacement, building systems upgrade
7and energy efficiency improvement

 

8Project Allocation

1,500,000

9(Base Project Allocation - $1,000,000)

 

10(Design & Contingencies - $500,000)

 

11(vi.1) Elk County

 

12(A) Construct new salt storage building
13at Elk County Stockpile Facility

 

14Project Allocation

350,000

15(Base Project Allocation - $300,000)

 

16(Design & Contingencies - $50,000)

 

17(vi.2) Erie County

 

18(A) Develop new stockpile facilities,
19including site purchase, design and
20construction at Erie County Stockpile
21Facility

 

22Project Allocation

9,000,000

23(Base Project Allocation - $5,250,000)

 

24(Land Allocation - $2,250,000)

 

25(Design & Contingencies - $1,500,000)

 

26(B) Renovate and expand Welcome Center
27Site L, including roof replacement,
28building systems upgrade, sidewalks,
29curbing, step replacement, parking lot
30upgrades and sewage plant upgrades

 

1Project Allocation

2,500,000

2(Base Project Allocation - $2,200,000)

 

3(Design & Contingencies - $300,000)

 

4(C) Renovate and expand Welcome Center
5Site M, including roof replacement,
6building systems upgrade, sidewalks,
7curbing, step replacement, parking lot
8upgrades and sewage plant upgrades

 

9Project Allocation

2,000,000

10(Base Project Allocation - $1,800,000)

 

11(Design & Contingencies - $200,000)

 

12(D) Renovate and expand Erie County
13Maintenance Garage, including roof
14replacement, building systems upgrade
15and energy efficiency improvement

 

16Project Allocation

2,500,000

17(Base Project Allocation - $2,125,000)

 

18(Design & Contingencies - $375,000)

 

19(vi.3) Fayette County

 

20(A) Construct new maintenance garage,
21including slat storage buildings,
22auxiliary buildings, site work and
23land acquisition

 

24Project Allocation

15,000,000

25(Base Project Allocation -
26$11,750,000)

 

27(Land Allocation - $1,000,000)

 

28(Design & Contingencies - $2,250,000)

 

29(B) Demolish and construct three new salt
30storage buildings and site work at

 

1Fayette County Maintenance Facility

 

2Project Allocation

1,200,000

3(Base Project Allocation - $1,050,000)

 

4(Design & Contingencies - $150,000)

 

5(C) Renovate and expand District Office
612-0, including roof replacement and
7building systems upgrade

 

8Project Allocation

2,500,000

9(Base Project Allocation - $2,150,000)

 

10(Design & Contingencies - $350,000)

 

11(D) Renovate and expand current driver
12licensing center, including roof
13replacement, building systems upgrade,
14sidewalks, curbing and parking lot
15upgrades

 

16Project Allocation

1,400,000

17(Base Project Allocation - $1,250,000)

 

18(Design & Contingencies - $150,000)

 

19(vi.4) Forest County

 

20(A) Construct new Forest County
21Maintenance Garage, including salt
22storage buildings, auxiliary
23buildings, site work and land
24acquisition

 

25Project Allocation

15,000,000

26(Base Project Allocation -
27$11,750,000)

 

28(Land Allocation - $1,000,000)

 

29(Design & Contingencies - $2,250,000)

 

30(B) Construct new salt storage facility

 

1at Forest County Stockpile Facility

 

2Project Allocation

350,000

3(Base Project Allocation - $298,000)

 

4(Design & Contingencies - $52,000)

 

5(vii) Franklin County

 

6(A) Develop new stockpile facility in
7Franklin County, including site
8purchase, design and construction

 

9Project Allocation

2,220,000

10(Base Project Allocation - $2,000,000)

 

11(Land Allocation - $20,000)

 

12(Design & Contingencies - $200,000)

 

13(B) Develop new stockpile facility to
14replace SP 17 in Franklin County,
15including site purchase, design and
16construction

 

17Project Allocation

2,220,000

18(Base Project Allocation - $2,000,000)

 

19(Land Allocation - $20,000)

 

20(Design & Contingencies - $200,000)

 

21(C) Construct new storage buildings and
22site work at various stockpiles

 

23Project Allocation

1,800,000

24(Base Project Allocation - $1,530,000)

 

25(Design & Contingencies - $270,000)

 

26(D) Renovate and expand current Franklin
27County Maintenance Garage, including
28roof replacement and building systems
29upgrade

 

30Project Allocation

2,000,000

1(Base Project Allocation - $1,700,000)

 

2(Design & Contingencies - $300,000)

 

3(E) Construct new salt storage buildings
4and site work at Franklin County
5Maintenance Stockpile

 

6Project Allocation

800,000

7(Base Project Allocation - $700,000)

 

8(Design & Contingencies - $100,000)

 

9(F) Renovate and expand Welcome Center
10Site G, including roof replacement,
11building systems upgrade, sidewalks,
12curbing, step replacement, parking lot
13upgrades and sewage plant upgrades

 

14Project Allocation

2,000,000

15(Base Project Allocation - $1,800,000)

 

16(Design & Contingencies - $200,000)

 

17(G) Renovate and expand current driver
18licensing center, including roof
19replacement, building systems upgrade,
20sidewalks, curbing and parking lot
21upgrades

 

22Project Allocation

1,400,000

23(Base Project Allocation - $1,250,000)

 

24(Design & Contingencies - $150,000)

 

25(vii.1) Fulton County

 

26(A) Renovate and expand current
27maintenance facility, including roof
28replacement, building systems upgrade
29and construction of two bays with
30overhead cranes

 

1Project Allocation

2,700,000

2(Base Project Allocation - $2,350,000)

 

3(Design & Contingencies - $350,000)

 

4(B) Demolish and construct new salt
5storage buildings and site work at
6Fulton County Maintenance Stockpile

 

7Project Allocation

1,200,000

8(Base Project Allocation - $1,050,000)

 

9(Design & Contingencies - $150,000)

 

10(C) Renovate and expand Welcome Center
11Site B, including roof replacement,
12building systems upgrade, sidewalks,
13curbing, step replacement, parking lot
14upgrades and sewage plant upgrades

 

15Project Allocation

2,500,000

16(Base Project Allocation - $2,200,000)

 

17(Design & Contingencies - $300,000)

 

18(D) Renovate and expand Rest Site 3,
19including roof replacement, building
20systems upgrade, sidewalks, curbing,
21step replacement, parking lot upgrades
22and sewage plant upgrades

 

23Project Allocation

2,500,000

24(Base Project Allocation - $2,200,000)

 

25(Design & Contingencies - $300,000)

 

26(vii.2) Greene County

 

27(A) Rehabilitate and expand Greene County
28Welcome Center

 

29Project Allocation

1,800,000

30(Base Project Allocation - $1,530,000)

 

1(Design & Contingencies - $270,000)

 

2(B) Demolish and construct new salt
3storage buildings and site work at
4Greene County Maintenance Stockpile

 

5Project Allocation

800,000

6(Base Project Allocation - $720,000)

 

7(Design & Contingencies - $80,000)

 

8(C) Renovate and expand Greene County
9Maintenance Facility, including roof
10replacement and building systems
11upgrade

 

12Project Allocation

3,000,000

13(Base Project Allocation - $2,650,000)

 

14(Design & Contingencies - $350,000)

 

15(D) Renovate and expand Welcome Center
16Site D, including roof replacement,
17building systems upgrade, sidewalks,
18curbing, step replacement, parking lot
19upgrades and sewage plant upgrades

 

20Project Allocation

2,500,000

21(Base Project Allocation - $2,200,000)

 

22(Design & Contingencies - $300,000)

 

23(E) Renovate and expand Greene County
24Driver Licensing Center, including
25roof replacement, building systems
26upgrade, sidewalks, curbing, step
27replacement, parking lot upgrades and
28sewage plant upgrades

 

29Project Allocation

1,400,000

30(Base Project Allocation - $1,250,000)

 

1(Design & Contingencies - $150,000)

 

2(vii.3) Huntingdon County

 

3(A) Renovate and expand Huntingdon County
4Maintenance Facility, including roof
5replacement and building systems
6upgrade

 

7Project Allocation

2,700,000

8(Base Project Allocation - $2,350,000)

 

9(Design & Contingencies - $350,000)

 

10(B) Demolish and construct new salt
11storage buildings and site work at
12Huntingdon County Maintenance
13Stockpile

 

14Project Allocation

1,200,000

15(Base Project Allocation - $1,050,000)

 

16(Design & Contingencies - $150,000)

 

17(vii.4) Indiana County

 

18(A) Develop new stockpile, including site
19purchase, design and construction

 

20Project Allocation

3,050,000

21(Base Project Allocation - $1,750,000)

 

22(Land Allocation - $750,000)

 

23(Design & Contingencies - $550,000)

 

24(B) Renovate and expand Indiana County
25Maintenance Garage, including roof
26replacement, building systems upgrade
27and energy efficiency improvement

 

28Project Allocation

2,520,000

29(Base Project Allocation - $2,220,000)

 

30(Design & Contingencies - $300,000)

 

1(vii.5) Jefferson County

 

2(A) Renovate and expand Rest Site 25,
3including roof replacement, building
4systems upgrade, sidewalks, curbing,
5step replacement, parking lot upgrades
6and sewage plant upgrades

 

7Project Allocation

2,500,000

8(Base Project Allocation - $2,200,000)

 

9(Design & Contingencies - $300,000)

 

10(B) Renovate and expand Rest Site 26,
11including roof replacement, building
12systems upgrade, sidewalks, curbing,
13step replacement, parking lot upgrades
14and sewage plant upgrades

 

15Project Allocation

2,500,000

16(Base Project Allocation - $2,200,000)

 

17(Design & Contingencies - $300,000)

 

18(C) Renovate and expand Jefferson County
19Maintenance Garage, including roof
20replacement, building systems upgrade
21and energy efficiency improvement

 

22Project Allocation

1,500,000

23(Base Project Allocation - $1,350,000)

 

24(Design & Contingencies - $150,000)

 

25(vii.6) Juniata County

 

26(A) Renovate and expand Juniata County
27Maintenance Garage, including roof
28replacement, building systems upgrade
29and energy efficiency improvement

 

30Project Allocation

2,000,000

1(Base Project Allocation - $1,700,000)

 

2(Design & Contingencies - $300,000)

 

3(viii) Lackawanna County

 

4(A) Renovate and expand District 4-0
5District Office to bring building into
6code compliance, upgrade buildings
7systems and improve program
8requirements and energy efficiency

 

9Project Allocation

2,750,000

10(Base Project Allocation - $2,500,000)

 

11(Design & Contingencies - $250,000)

 

12(B) Construct new county metal storage
13building at Lackawanna County
14Maintenance Facility

 

15Project Allocation

350,000

16(Base Project Allocation - $300,000)

 

17(Design & Contingencies - $50,000)

 

18(C) Construct new Lackawanna County
19Maintenance Garage

 

20Project Allocation

15,000,000

21(Base Project Allocation -
22$11,750,000)

 

23(Land Allocation - $1,000,000)

 

24(Design & Contingencies - $2,250,000)

 

25(D) Renovate and expand current
26Lackawanna County Maintenance Garage,
27including roof replacement and
28building systems upgrade

 

29Project Allocation

2,520,000

30(Base Project Allocation - $2,125,000)

 

1(Design & Contingencies - $375,000)

 

2(E) Demolish and construct four new
3storage buildings and site work at
4various stockpiles at Lackawanna
5County Stockpile Facility

 

6Project Allocation

1,600,000

7(Base Project Allocation - $1,400,000)

 

8(Design & Contingencies - $200,000)

 

9(F) Construct addition to District Office
104-0 for expansion of work units,
11conference rooms and cafeteria

 

12Project Allocation

4,000,000

13(Base Project Allocation - $3,400,000)

 

14(Design & Contingencies - $600,000)

 

15(G) Renovate and expand Lackawanna County
16Roadside Rest Site 36, including roof
17replacement, building systems upgrade,
18energy efficiency improvement,
19sidewalks, curbing and step
20replacement, parking lot upgrades and
21water and sewer treatment plant
22upgrades

 

23Project Allocation

2,500,000

24(Base Project Allocation - $2,200,000)

 

25(Design & Contingencies - $300,000)

 

26(ix) Lancaster County

 

27(A) Develop new stockpile facility in
28Lancaster County, including site
29purchase, design and construction

 

30Project Allocation

2,220,000

1(Base Project Allocation - $2,000,000)

 

2(Land Allocation - $20,000)

 

3(Design & Contingencies - $200,000)

 

4(B) Renovate and expand current Lancaster
5County Maintenance Garage, including
6roof replacement and building systems
7upgrade

 

8Project Allocation

2,500,000

9(Base Project Allocation - $2,125,000)

 

10(Design & Contingencies - $375,000)

 

11(C) Demolish and construct new salt
12storage buildings and site work at
13various stockpiles

 

14Project Allocation

2,000,000

15(Base Project Allocation - $1,750,000)

 

16(Design & Contingencies - $250,000)

 

17(x) Lawrence County

 

18(A) Construct new PM building at Lawrence
19County Maintenance Facility

 

20Project Allocation

825,000

21(Base Project Allocation - $750,000)

 

22(Design & Contingencies - $75,000)

 

23(B) Develop new stock pile facility,
24including site purchase, design and
25construction

 

26Project Allocation

3,000,000

27(Base Project Allocation - $1,750,000)

 

28(Land Allocation - $750,000)

 

29(Design & Contingencies - $500,000)

 

30(C) Construct new salt storage building

 

1at Lawrence County Maintenance
2Facility

 

3Project Allocation

800,000

4(Base Project Allocation - $720,000)

 

5(Design & Contingencies - $80,000)

 

6(D) Construct new maintenance garage,
7including salt storage buildings,
8auxiliary buildings, site work and
9land acquisition

 

10Project Allocation

15,000,000

11(Base Project Allocation -
12$11,750,000)

 

13(Land Allocation - $1,000,000)

 

14(Design & Contingencies - $2,250,000)

 

15(E) Demolish and construct two new salt
16storage buildings and site work at
17Lawrence County Maintenance Stockpile

 

18Project Allocation

800,000

19(Base Project Allocation - $700,000)

 

20(Design & Contingencies - $100,000)

 

21(F) Renovate and expand Lawrence County
22Driver Licensing Center, including
23roof replacement, building systems
24upgrade, sidewalks, curbing, step
25replacement, parking lot upgrades and
26sewage plant upgrades

 

27Project Allocation

1,400,000

28(Base Project Allocation - $1,250,000)

 

29(Design & Contingencies - $150,000)

 

30(G) Renovate and expand Lawrence County

 

1Roadside Rest Site 15, including roof
2replacement, building systems upgrade,
3energy efficiency improvement,
4sidewalks, curbing, step replacement
5and parking lot upgrades

 

6Project Allocation

1,250,000

7(Base Project Allocation - $1,200,000)

 

8(Design & Contingencies - $50,000)

 

9(H) Renovate and expand Lawrence County
10Roadside Rest Site 16, including roof
11replacement, building systems upgrade,
12energy efficiency improvement,
13sidewalks, curbing, step replacement
14and parking lot upgrades

 

15Project Allocation

1,250,000

16(Base Project Allocation - $1,200,000)

 

17(Design & Contingencies - $50,000)

 

18(x.1) Lebanon County

 

19(A) Construct new maintenance garage,
20including salt storage buildings,
21auxiliary buildings, site work and
22land acquisition

 

23Project Allocation

15,000,000

24(Base Project Allocation -
25$11,750,000)

 

26(Land Allocation - $1,000,000)

 

27(Design & Contingencies - $2,250,000)

 

28(B) Demolish and construct new salt
29storage buildings and site work at
30various stockpiles

 

1Project Allocation

1,600,000

2(Base Project Allocation - $1,400,000)

 

3(Design & Contingencies - $200,000)

 

4(C) Renovate and expand Lebanon County
5Driver Licensing Center, including
6roof replacement, building systems
7upgrade, sidewalks, curbing, step
8replacement, parking lot upgrades and
9sewage plant upgrades

 

10Project Allocation

1,400,000

11(Base Project Allocation - $1,250,000)

 

12(Design & Contingencies - $150,000)

 

13(D) Renovate and expand Lebanon County
14Maintenance Garage, including roof
15replacement, building systems upgrade
16and energy efficiency improvement

 

17Project Allocation

2,000,000

18(Base Project Allocation - $1,700,000)

 

19(Design & Contingencies - $300,000)

 

20(xi) Lehigh County

 

21(A) Construct new vehicle wash building
22at Lehigh County Maintenance Garage

 

23Project Allocation

690,000

24(Base Project Allocation - $600,000)

 

25(Design & Contingencies - $90,000)

 

26(B) Renovate and expand Lehigh County
27Maintenance Garage to upgrade building
28systems and improve program
29requirements and energy efficiency

 

30Project Allocation

1,150,000

1(Base Project Allocation - $1,000,000)

 

2(Design & Contingencies - $150,000)

 

3(C) Construction of new salt storage
4building at Lehigh County Maintenance
5Facility

 

6Project Allocation

350,000

7(Base Project Allocation - $300,000)

 

8(Design & Contingencies - $50,000)

 

9(D) Renovate and expand District Office
105-0, including roof replacement and
11building systems upgrade

 

12Project Allocation

2,000,000

13(Base Project Allocation - $1,700,000)

 

14(Design & Contingencies - $300,000)

 

15(E) Renovate and expand Lehigh County
16Maintenance Facility, including roof
17replacement, building systems upgrade
18and energy efficiency improvement

 

19Project Allocation

1,500,000

20(Base Project Allocation - $1,275,000)

 

21(Design & Contingencies - $225,000)

 

22(xii) Luzerne County

 

23(A) Develop new stockpile facility,
24including site purchase, design and
25construction

 

26Project Allocation

2,220,000

27(Base Project Allocation - $2,000,000)

 

28(Land Allocation - $20,000)

 

29(Design & Contingencies - $200,000)

 

30(B) Construct new salt storage buildings

 

1at Luzerne County Maintenance Facility

 

2Project Allocation

850,000

3(Base Project Allocation - $730,000)

 

4(Design & Contingencies - $120,000)

 

5(C) Construct new bay storage buildings
6with overhead doors at Luzerne County
7Maintenance Facility

 

8Project Allocation

350,000

9(Base Project Allocation - $300,000)

 

10(Design & Contingencies - $50,000)

 

11(D) Construct new county metal storage
12building at Luzerne County Maintenance
13Facility

 

14Project Allocation

350,000

15(Base Project Allocation - $300,000)

 

16(Design & Contingencies - $50,000)

 

17(E) Construct seven new salt storage
18buildings and site work at various
19stockpiles at Luzerne County Stockpile
20Facility

 

21Project Allocation

2,800,000

22(Base Project Allocation - $2,450,000)

 

23(Design & Contingencies - $350,000)

 

24(F) Renovate and expand Rest Site 39,
25including roof replacement, building
26systems upgrade, sidewalks, curbing,
27step replacement, parking lot upgrades
28and sewage plant upgrades

 

29Project Allocation

2,500,000

30(Base Project Allocation - $2,200,000)

 

1(Design & Contingencies - $300,000)

 

2(G) Renovate and expand Rest Site 53,
3including roof replacement, building
4systems upgrade, sidewalks, curbing,
5step replacement, parking lot upgrades
6and sewage plant upgrades

 

7Project Allocation

1,050,000

8(Base Project Allocation - $1,000,000)

 

9(Design & Contingencies - $50,000)

 

10(H) Renovate and expand Rest Site 54,
11including roof replacement, building
12systems upgrade, sidewalks, curbing,
13step replacement, parking lot upgrades
14and sewage plant upgrades

 

15Project Allocation

1,050,000

16(Base Project Allocation - $1,000,000)

 

17(Design & Contingencies - $50,000)

 

18(xii.1) Lycoming County

 

19(A) Demolish and construct new storage
20buildings and site work at various
21stockpiles at Lycoming County
22Stockpile Facility

 

23Project Allocation

1,200,000

24(Base Project Allocation - $1,050,000)

 

25(Design & Contingencies - $150,000)

 

26(B) Renovate and expand current District
27Office 3-0, including roof replacement
28and building systems upgrade

 

29Project Allocation

2,500,000

30(Base Project Allocation - $2,125,000)

 

1(Design & Contingencies - $375,000)

 

2(C) Renovate and expand Lycoming County
3Maintenance Garage, including roof
4replacement, building systems upgrade
5and energy efficiency improvement

 

6Project Allocation

2,000,000

7(Base Project Allocation - $1,700,000)

 

8(Design & Contingencies - $300,000)

 

9(xii.2) McKean County

 

10(A) Construct new salt storage buildings
11at McKean County Stockpile Facility

 

12Project Allocation

700,000

13(Base Project Allocation - $650,000)

 

14(Design & Contingencies - $50,000)

 

15(B) Renovate and expand McKean County
16Maintenance Garage, including roof
17replacement, building systems upgrade
18and energy efficiency improvement

 

19Project Allocation

2,000,000

20(Base Project Allocation - $1,700,000)

 

21(Design & Contingencies - $300,000)

 

22(xii.3) Mercer County

 

23(A) Develop new maintenance garage,
24including site purchase, design and
25construction at Mercer County
26Maintenance Garage

 

27Project Allocation

2,500,000

28(Base Project Allocation - $2,125,000)

 

29(Design & Contingencies - $375,000)

 

30(B) Renovate and expand Rest Site 17,

 

1including roof replacement, building
2systems upgrade, sidewalks, curbing,
3step replacement, parking lot upgrades
4and sewage plant upgrades

 

5Project Allocation

2,500,000

6(Base Project Allocation - $2,200,000)

 

7(Design & Contingencies - $300,000)

 

8(C) Renovate and expand Rest Site 18,
9including roof replacement, building
10systems upgrade, sidewalks, curbing,
11step replacement, parking lot upgrades
12and sewage plant upgrades

 

13Project Allocation

2,500,000

14(Base Project Allocation - $2,200,000)

 

15(Design & Contingencies - $300,000)

 

16(D) Construct new county maintenance
17garage, including salt storage
18buildings, auxiliary buildings, site
19work and acquisition of site at Mercer
20County Maintenance Garage

 

21Project Allocation

15,000,000

22(Base Project Allocation -
23$11,750,000)

 

24(Land Allocation - $1,000,000)

 

25(Design & Contingencies - $2,250,000)

 

26(E) Demolish and construct new storage
27buildings and site work at various
28stock piles at Mercer County Stockpile
29Facility

 

30Project Allocation

800,000

1(Base Project Allocation - $700,000)

 

2(Design & Contingencies - $100,000)

 

3(F) Renovate and expand Mercer County
4Driver Licensing Center, including
5roof replacement, building systems
6upgrade, sidewalks, curbing, step
7replacement, parking lot upgrades and
8sewage plant upgrades

 

9Project Allocation

1,400,000

10(Base Project Allocation - $1,250,000)

 

11(Design & Contingencies - $150,000)

 

12(xii.4) Mifflin County

 

13(A) Renovate and expand Mifflin County
14Driver Licensing Center, including
15roof replacement, building systems
16upgrade, sidewalks, curbing, step
17replacement, parking lot upgrades and
18sewage plant upgrades

 

19Project Allocation

1,400,000

20(Base Project Allocation - $1,250,000)

 

21(Design & Contingencies - $150,000)

 

22(xii.5) Monroe County

 

23(A) Construct new salt storage building,
24auxiliary buildings, site work and
25land acquisition at Monroe County
26Maintenance Facility

 

27Project Allocation

15,000,000

28(Base Project Allocation -
29$11,750,000)

 

30(Land Allocation - $1,000,000)

 

1(Design & Contingencies - $2,250,000)

 

2(B) Renovate and expand current Monroe
3County Welcome Center, including roof
4replacement and building systems
5upgrade

 

6Project Allocation

3,000,000

7(Base Project Allocation - $2,550,000)

 

8(Design & Contingencies - $450,000)

 

9(C) Renovate and expand Rest Site 41,
10including roof replacement, building
11systems upgrade, program requirements
12improvement, sidewalks, curbing, step
13replacement, parking lot upgrades and
14sewage plant upgrades

 

15Project Allocation

2,500,000

16(Base Project Allocation - $2,200,000)

 

17(Design & Contingencies - $300,000)

 

18(D) Renovate and expand Monroe County
19Maintenance Facility, including roof
20replacement, building systems upgrades
21and energy efficiency improvement

 

22Project Allocation

2,000,000

23(Base Project Allocation - $1,700,000)

 

24(Design & Contingencies - $300,000)

 

25(xiii) Montgomery County

 

26(A) Renovate Montgomery County District
27Office by designing and constructing
28dry chemical fire protection system
29for TCC and all server rooms

 

30Project Allocation

440,000

1(Base Project Allocation - $400,000)

 

2(Design & Contingencies - $40,000)

 

3(B) Construct new garage parking deck at
4Montgomery County District Office

 

5Project Allocation

3,300,000

6(Base Project Allocation - $3,000,000)

 

7(Design & Contingencies - $300,000)

 

8(C) Renovate and expand Montgomery County
9Maintenance Garage to upgrade building
10systems and improve program
11requirements and energy efficiency

 

12Project Allocation

825,000

13(Base Program Allocation - $750,000)

 

14(Design & Contingencies - $75,000)

 

15(D) Renovate and expand District 6-0
16District Office to bring building into
17code compliance, upgrade buildings
18systems and improve program
19requirements and energy efficiency

 

20Project Allocation

2,200,000

21(Base Project Allocation - $2,000,000)

 

22(Design & Contingencies - $200,000)

 

23(E) Construction of new salt storage
24buildings and site work at Montgomery
25County Maintenance Facility

 

26Project Allocation

2,000,000

27(Base Project Allocation - $1,750,000)

 

28(Design & Contingencies - $250,000)

 

29(F) Renovate and expand Montgomery County
30Driver Licensing Center, including

 

1roof replacement, building systems
2upgrade, sidewalks, curbing, step
3replacement, parking lot upgrades and
4sewage plant upgrades

 

5Project Allocation

1,400,000

6(Base Project Allocation - $1,250,000)

 

7(Design & Contingencies - $150,000)

 

8(G) Renovate and expand Montgomery County
9Maintenance Garage, including roof
10replacement, building systems upgrade
11and energy efficiency improvement

 

12Project Allocation

1,500,000

13(Base Project Allocation - $1,275,000)

 

14(Design & Contingencies - $225,000)

 

15(xiii.1) Montour County

 

16(A) Demolish and construct new storage
17buildings and site work at various
18stockpiles at Montour County Stockpile
19Facility

 

20Project Allocation

800,000

21(Base Project Allocation - $700,000)

 

22(Design & Contingencies - $100,000)

 

23(B) Renovate and expand Rest Site 35,
24including roof replacement, building
25systems upgrade, sidewalks, curbing,
26step replacement, parking lot upgrades
27and sewage plant upgrades

 

28Project Allocation

2,500,000

29(Base Project Allocation - $2,200,000)

 

30(Design & Contingencies - $300,000)

 

1(C) Renovate and expand Rest Site 36,
2including roof replacement, building
3systems upgrade, sidewalks, curbing,
4step replacement, parking lot upgrades
5and sewage plant upgrades

 

6Project Allocation

2,500,000

7(Base Project Allocation - $2,200,000)

 

8(Design & Contingencies - $300,000)

 

9(xiii.2) Northampton County

 

10(A) Construct new salt storage buildings,
11auxiliary buildings, site work and
12land acquisition at Northampton County
13Maintenance Facility

 

14Project Allocation

15,000,000

15(Base Project Allocation -
16$11,750,000)

 

17(Land Allocation - $1,000,000)

 

18(Design & Contingencies - $2,250,000)

 

19(B) Renovate and expand current
20Northampton County Maintenance Garage,
21including roof replacement and
22building systems upgrade

 

23Project Allocation

2,000,000

24(Base Project Allocation - $1,700,000)

 

25(Design & Contingencies - $300,000)

 

26(C) Construct new salt storage building
27and site work at Northampton County
28Maintenance Garage

 

29Project Allocation

350,000

30(Base Project Allocation - $300,000)

 

1(Design & Contingencies - $50,000)

 

2(xiii.3) Northumberland County

 

3(A) Demolish and construct new storage
4buildings and site work at various
5stockpiles at Northumberland County
6Stockpile Facility

 

7Project Allocation

1,600,000

8(Base Project Allocation - $1,400,000)

 

9(Design & Contingencies - $200,000)

 

10(B) Construct new maintenance garage,
11including salt storage buildings,
12auxiliary buildings, site work and
13land acquisition

 

14Project Allocation

15,000,000

15(Base Project Allocation -
16$11,750,000)

 

17(Land Allocation - $1,000,000)

 

18(Design & Contingencies - $2,250,000)

 

19(C) Renovate and expand Northumberland
20County Maintenance Garage, including
21roof replacement, building systems
22upgrade and energy efficiency
23improvement

 

24Project Allocation

2,000,000

25(Base Project Allocation - $1,700,000)

 

26(Design & Contingencies - $300,000)

 

27(xiv) Perry County

 

28(A) Develop new stockpile facility in
29Perry County, including site purchase,
30design and construction

 

1Project Allocation

2,220,000

2(Base Project Allocation - $2,000,000)

 

3(Land Allocation - $20,000)

 

4(Design & Contingencies - $200,000)

 

5(B) Demolish and construct new salt
6storage buildings and site work at
7various stockpiles

 

8Project Allocation

1,200,000

9(Base Project Allocation - $1,050,000)

 

10(Design & Contingencies - $150,000)

 

11(C) Develop new stockpile, including site
12purchase, design and construction

 

13Project Allocation

3,000,000

14(Base Project Allocation - $1,750,000)

 

15(Land Allocation - $750,000)

 

16(Design & Contingencies - $500,000)

 

17(xiv.1) Philadelphia County

 

18(A) Construction of new salt storage
19building at Philadelphia County
20Maintenance Facility

 

21Project Allocation

400,000

22(Base Project Allocation - $350,000)

 

23(Design & Contingencies - $50,000)

 

24(B) Renovate and expand Philadelphia
25County Maintenance Facility, including
26roof replacement and building systems
27upgrade

 

28Project Allocation

2,000,000

29(Base Project Allocation - $1,700,000)

 

30(Design & Contingencies - $300,000)

 

1(C) Demolish and construct new salt
2storage building and site work at
3Philadelphia County Maintenance
4Facility

 

5Project Allocation

400,000

6(Base Project Allocation - $350,000)

 

7(Design & Contingencies - $50,000)

 

8(D) Renovate and expand Philadelphia
9County Driver Licensing Center,
10including roof replacement, building
11systems upgrade, sidewalks, curbing,
12step replacement, parking lot upgrades
13and sewage plant upgrades

 

14Project Allocation

1,400,000

15(Base Project Allocation - $1,250,000)

 

16(Design & Contingencies - $150,000)

 

17(xiv.2) Pike County

 

18(A) Construct new salt storage building
19and site work at Pike County
20Maintenance Facility

 

21Project Allocation

400,000

22(Base Project Allocation - $350,000)

 

23(Design & Contingencies - $50,000)

 

24(B) Renovate and expand Welcome Center
25Site K, including roof replacement,
26building systems upgrade, sidewalks,
27curbing, step replacement, parking lot
28upgrades and sewage plant upgrades

 

29Project Allocation

2,000,000

30(Base Project Allocation - $1,800,000)

 

1(Design & Contingencies - $200,000)

 

2(C) Renovate and expand Rest Site 61,
3including roof replacement, building
4systems upgrade, sidewalks, curbing,
5step replacement, parking lot upgrades
6and sewage plant upgrades

 

7Project Allocation

2,500,000

8(Base Project Allocation - $2,200,000)

 

9(Design & Contingencies - $300,000)

 

10(D) Renovate and expand Rest Site 62,
11including roof replacement, building
12systems upgrade, sidewalks, curbing,
13step replacement, parking lot upgrades
14and sewage plant upgrades

 

15Project Allocation

2,500,000

16(Base Project Allocation - $2,200,000)

 

17(Design & Contingencies - $300,000)

 

18(E) Removal and roof replacement system
19at maintenance facility at Pike County
20Welcome Center

 

21Project Allocation

650,000

22(Base Project Allocation - $600,000)

 

23(Design & Contingencies - $50,000)

 

24(xiv.3) Potter County

 

25(A) Renovate and expand current Potter
26County Maintenance Garage

 

27Project Allocation

2,000,000

28(Base Project Allocation - $1,700,000)

 

29(Design & Contingencies - $300,000)

 

30(B) Demolish and construct two new

 

1storage buildings and site work at
2Potter County Stockpile Facility

 

3Project Allocation

1,050,000

4(Base Project Allocation - $900,000)

 

5(Design & Contingencies - $150,000)

 

6(xv) Schuylkill County

 

7(A) Renovate and expand Schuylkill County
8Maintenance Garage to upgrade building
9systems and improve program
10requirements and energy efficiency

 

11Project Allocation

1,150,000

12(Base Project Allocation - $1,000,000)

 

13(Design & Contingencies - $150,000)

 

14(B) Renovate and expand current
15Schuylkill County Maintenance Garage,
16including roof replacement and
17building systems upgrade

 

18Project Allocation

1,500,000

19(Base Project Allocation - $1,275,000)

 

20(Design & Contingencies - $225,000)

 

21(C) Construct new salt storage building
22and site work at Schuylkill County
23Maintenance Facility

 

24Project Allocation

400,000

25(Base Project Allocation - $350,000)

 

26(Design & Contingencies - $50,000)

 

27(D) Renovate and expand Schuylkill County
28Driver Licensing Center, including
29roof replacement, building systems
30upgrade, sidewalks, curbing, step

 

1replacement, parking lot upgrades and
2sewage plant upgrades

 

3Project Allocation

1,400,000

4(Base Project Allocation - $1,250,000)

 

5(Design & Contingencies - $150,000)

 

6(xv.1) Snyder County

 

7(A) Demolish and construct new storage
8buildings and site work at various
9stockpiles at Snyder County Stockpile
10Facility

 

11Project Allocation

800,000

12(Base Project Allocation - $700,000)

 

13(Design & Contingencies - $100,000)

 

14(B) Renovate and expand Snyder County
15Driver Licensing Center, including
16roof replacement, building systems
17upgrade, sidewalks, curbing, step
18replacement, parking lot upgrades and
19sewage plant upgrades

 

20Project Allocation

1,400,000

21(Base Project Allocation - $1,250,000)

 

22(Design & Contingencies - $150,000)

 

23(xv.2) Somerset County

 

24(A) Demolish and construct new salt
25storage buildings and site work at
26Somerset County Maintenance Stockpile

 

27Project Allocation

1,200,000

28(Base Project Allocation - $1,050,000)

 

29(Design & Contingencies - $150,000)

 

30(B) Develop new stockpile, including site

 

1purchase, design and construction

 

2Project Allocation

3,000,000

3(Base Project Allocation - $1,750,000)

 

4(Land Allocation - $750,000)

 

5(Design & Contingencies - $500,000)

 

6(C) Renovate and expand Somerset County
7Maintenance Garage, including roof
8replacement and building systems
9upgrade

 

10Project Allocation

2,500,000

11(Base Project Allocation - $2,125,000)

 

12(Design & Contingencies - $375,000)

 

13(D) Renovate and expand current drivers
14license center, including roof
15replacement, building systems upgrade,
16program requirements improvement,
17sidewalks, curbing, step replacement
18and parking lot upgrades.

 

19Project Allocation

1,400,000

20(Base Project Allocation - $1,250,000)

 

21(Design & Contingencies - $150,000)

 

22(xv.3) Sullivan County

 

23(A) Renovate and expand current Sullivan
24County Maintenance Garage, including
25roof replacement and building systems
26upgrade

 

27Project Allocation

1,500,000

28(Base Project Allocation - $1,275,000)

 

29(Design & Contingencies - $225,000)

 

30(B) Demolish and construct two new

 

1storage buildings and site work at
2various stockpiles at Sullivan County
3Stockpile Facility

 

4Project Allocation

800,000

5(Base Project Allocation - $700,000)

 

6(Design & Contingencies - $100,000)

 

7(xv.4) Susquehanna County

 

8(A) Renovate and expand current
9Susquehanna County Maintenance
10Facility, including roof replacement
11and building systems upgrade

 

12Project Allocation

2,500,000

13(Base Project Allocation - $2,100,000)

 

14(Design & Contingencies - $400,000)

 

15(B) Reskin metal building at Susquehanna
16County Maintenance Facility

 

17Project Allocation

350,000

18(Base Project Allocation - $300,000)

 

19(Design & Contingencies - $50,000)

 

20(C) Construct new salt storage buildings
21and site work at various stockpiles at
22Susquehanna County Maintenance
23Facility

 

24Project Allocation

800,000

25(Base Project Allocation - $700,000)

 

26(Design & Contingencies - $100,000)

 

27(D) Renovate and expand Rest Site 56,
28including roof replacement, building
29systems upgrade, sidewalks, curbing,
30step replacement, parking lot upgrades

 

1and sewage plant upgrades

 

2Project Allocation

2,500,000

3(Base Project Allocation - $2,200,000)

 

4(Design & Contingencies - $300,000)

 

5(E) Renovate and expand Welcome Center
6Site H, including roof replacement,
7building systems upgrade, sidewalks,
8curbing, step replacement, parking lot
9upgrades and sewage plant upgrades

 

10Project Allocation

2,000,000

11(Base Project Allocation - $1,800,000)

 

12(Design & Contingencies - $200,000)

 

13(xv.5) Tioga County

 

14(A) Renovate and expand current Tioga
15County Maintenance Garage, including
16roof replacement and building systems
17upgrade

 

18Project Allocation

2,500,000

19(Base Project Allocation - $2,125,000)

 

20(Design & Contingencies - $375,000)

 

21(B) Construct new Tioga County
22Maintenance Garage, including salt
23storage buildings, auxiliary
24buildings, site work and land
25acquisition

 

26Project Allocation

15,000,000

27(Base Project Allocation -
28$11,750,000)

 

29(Land Allocation - $1,000,000)

 

30(Design & Contingencies - $2,250,000)

 

1(C) Demolish and construct new storage
2buildings and site work at various
3stockpiles at Tioga County Stockpile
4Facility

 

5Project Allocation

1,200,000

6(Base Project Allocation - $1,050,000)

 

7(Design & Contingencies - $150,000)

 

8(D) Renovate and expand Welcome Center
9Site T, including roof replacement,
10building systems upgrade, sidewalks,
11curbing, step replacement, parking lot
12upgrades and sewage plant upgrades

 

13Project Allocation

2,000,000

14(Base Project Allocation - $1,800,000)

 

15(Design & Contingencies - $200,000)

 

16(xv.6) Union County

 

17(A) Renovate and expand current Union
18County Maintenance Garage, including
19roof replacement and building systems
20upgrade

 

21Project Allocation

2,500,000

22(Base Project Allocation - $2,125,000)

 

23(Design & Contingencies - $375,000)

 

24(B) Demolish and construct new storage
25buildings and site work at various
26stockpiles at Union County Stockpile
27Facility

 

28Project Allocation

400,000

29(Base Project Allocation - $350,000)

 

30(Design & Contingencies - $50,000)

 

1(xv.7) Venango County

 

2(A) Construct new county maintenance
3garage, including salt storage
4buildings, auxiliary buildings, site
5work and acquisition of land at
6Venango County Maintenance Garage

 

7Project Allocation

15,000,000

8(Base Project Allocation -
9$11,750,000)

 

10(Land Allocation - $1,000,000)

 

11(Design & Contingencies - $2,250,000)

 

12(B) Construct parking lot at District
13Office 1-0

 

14Project Allocation

400,000

15(Base Project Allocation - $350,000)

 

16(Design & Contingencies - $50,000)

 

17(C) Demolish and construct new storage
18building and site work at Venango
19County Stockpile Facility

 

20Project Allocation

400,000

21(Base Project Allocation - $350,000)

 

22(Design & Contingencies - $50,000)

 

23(D) Renovate and expand Rest Site 21,
24including roof replacement, building
25systems upgrade, sidewalks, curbing,
26step replacement, parking lot upgrades
27and sewage plan upgrades

 

28Project Allocation

2,500,000

29(Base Project Allocation - $2,200,000)

 

30(Design & Contingencies - $300,000)

 

1(E) Renovate and expand Rest Site 22,
2including roof replacement, building
3systems upgrade, sidewalks, curbing,
4step replacement, parking lot upgrades
5and sewage plan upgrades

 

6Project Allocation

2,500,000

7(Base Project Allocation - $2,200,000)

 

8(Design & Contingencies - $300,000)

 

9(F) Renovate and expand current Venango
10County District Office, including roof
11replacement and building systems
12upgrade

 

13Project Allocation

2,500,000

14(Base Project Allocation - $2,125,000)

 

15(Design & Contingencies - $375,000)

 

16(G) Renovate and expand Venango County
17Driver Licensing Center, including
18roof replacement, building systems
19upgrade, sidewalks, curbing, step
20replacement, parking lot upgrades and
21sewage plan upgrades

 

22Project Allocation

1,400,000

23(Base Project Allocation - $1,250,000)

 

24(Design & Contingencies - $150,000)

 

25(xv.8) Warren County

 

26(A) Demolish and construct new storage
27buildings and site work at various
28stock piles at Warren County Stockpile
29Facility

 

30Project Allocation

1,800,000

1(Base Project Allocation - $1,550,000)

 

2(Design & Contingencies - $250,000)

 

3(B) Renovate and expand Warren County
4Driver Licensing Center, including
5roof replacement, building systems
6upgrade, sidewalks, curbing, step
7replacement, parking lot upgrades and
8sewage plan upgrades

 

9Project Allocation

1,400,000

10(Base Project Allocation - $1,250,000)

 

11(Design & Contingencies - $150,000)

 

12(C) Renovate and expand Warren County
13Maintenance Garage, including roof
14replacement, building systems upgrade
15and energy efficiency improvement

 

16Project Allocation

2,500,000

17(Base Project Allocation - $2,125,000)

 

18(Design & Contingencies - $375,000)

 

19(xvi) Washington County

 

20(A) Develop new stockpile facility,
21including site purchase, design and
22construction

 

23Project Allocation

2,220,000

24(Base Project Allocation - $2,000,000)

 

25(Land Allocation - $20,000)

 

26(Design & Contingencies - $200,000)

 

27(B) Develop new stockpile facility at
28Atlasburg, including site purchase,
29design and construction

 

30Project Allocation

2,220,000

1(Base Project Allocation - $2,000,000)

 

2(Land Allocation - $20,000)

 

3(Design & Contingencies - $200,000)

 

4(C) Demolish and construct new salt
5storage buildings and site work at
6Washington County Maintenance
7Stockpile

 

8Project Allocation

1,200,000

9(Base Project Allocation - $1,050,000)

 

10(Design & Contingencies - $150,000)

 

11(D) Renovate and expand Welcome Center
12Site A, including roof replacement,
13building systems upgrade, sidewalks,
14curbing, step replacement, parking lot
15upgrades and sewage plan upgrades

 

16Project Allocation

2,500,000

17(Base Project Allocation - $2,200,000)

 

18(Design & Contingencies - $300,000)

 

19(xvi.1) Wayne County

 

20(A) Renovate and expand current Wayne
21County Maintenance Facility, including
22roof replacement and building systems
23upgrade

 

24Project Allocation

2,500,000

25(Base Project Allocation - $2,100,000)

 

26(Design & Contingencies - $400,000)

 

27(B) Reskin metal building at Wayne County
28Maintenance Facility

 

29Project Allocation

350,000

30(Base Project Allocation - $300,000)

 

1(Design & Contingencies - $50,000)

 

2(C) Construct new salt storage buildings
3and site work at various stockpiles at
4Wayne County Maintenance Facility

 

5Project Allocation

800,000

6(Base Project Allocation - $700,000)

 

7(Design & Contingencies - $100,000)

 

8(xvi.2) Westmoreland County

 

9(A) Construct new salt storage building
10at Westmoreland County Maintenance
11Facility

 

12Project Allocation

400,000

13(Base Project Allocation - $380,000)

 

14(Design & Contingencies - $20,000)

 

15(B) Construct retaining wall at Latrobe
16Stockpile

 

17Project Allocation

325,000

18(Base Project Allocation - $300,000)

 

19(Design & Contingencies - $25,000)

 

20(C) Purchase additional property for
21expansion of Westmoreland County
22Maintenance Garage

 

23Project Allocation

1,000,000

24(Land Allocation - $1,000,000)

 

25(D) Rehabilitate and expand 12-5
26Maintenance Facility, including
27infrastructure

 

28Project Allocation

3,000,000

29(Base Project Allocation - $2,650,000)

 

30(Design & Contingencies - $350,000)

 

1(E) Demolish and construct new salt
2storage buildings and site work at
3Westmoreland County Maintenance
4Stockpile

 

5Project Allocation

2,400,000

6(Base Project Allocation - $2,100,000)

 

7(Design & Contingencies - $300,000)

 

8(xvi.3) Wyoming County

 

9(A) Renovate and expand current Wyoming
10County Maintenance Facility, including
11roof replacement and building systems
12upgrade

 

13Project Allocation

2,500,000

14(Base Project Allocation - $2,100,000)

 

15(Design & Contingencies - $400,000)

 

16(xvii) York County

 

17(A) Develop a new stockpile facility,
18including site purchase, design and
19construction

 

20Project Allocation

2,220,000

21(Base Project Allocation - $2,000,000)

 

22(Land Allocation - $20,000)

 

23(Design & Contingencies - $200,000)

 

24(B) Construct new vehicle wash building
25at York County Maintenance Garage

 

26Project Allocation

690,000

27(Base Project Allocation - $600,000)

 

28(Design & Contingencies - $90,000)

 

29(C) Develop new maintenance garage,
30including site purchase, design and

 

1construction

 

2Project Allocation

5,000,000

3(Base Project Allocation - $3,000,000)

 

4(Land Allocation - $1,500,000)

 

5(Design & Contingencies - $500,000)

 

6(D) Renovate and expand current York
7County Maintenance Garage, including
8roof replacement and building systems
9upgrade

 

10Project Allocation

2,000,000

11(Base Project Allocation - $1,700,000)

 

12(Design & Contingencies - $300,000)

 

13(E) Demolish and construct new salt
14storage buildings and site work at
15York County Maintenance Stockpile

 

16Project Allocation

3,200,000

17(Base Project Allocation - $2,800,000)

 

18(Design & Contingencies - $400,000)

 

19(F) Develop new stockpile, including site
20purchase, design and construction

 

21Project Allocation

3,000,000

22(Base Project Allocation - $1,750,000)

 

23(Land Allocation - $750,000)

 

24(Design & Contingencies - $500,000)

 

25(G) Construct new welcome center,
26including auxiliary buildings, site
27work and site acquisition

 

28Project Allocation

10,000,000

29(Base Project Allocation - $7,500,000)

 

30(Land Allocation - $1,000,000)

 

1(Design & Contingencies - $1,500,000)

 

2(H) Renovate and expand Welcome Center
3Site J, including roof replacement,
4building systems upgrade, sidewalks,
5curbing, step replacement, parking lot
6upgrades and sewage plan upgrades

 

7Project Allocation

2,000,000

8(Base Project Allocation - $1,800,000)

 

9(Design & Contingencies - $200,000)

 

10(xviii) Montgomery and Philadelphia Counties

 

11(A) City Avenue Special Services
12District. Construction, infrastructure
13improvements and other related costs
14on City Avenue for pedestrian and
15vehicular hazard mitigation and storm
16water management in Lower Merion and
17the City of Philadelphia

 

18Project Allocation

10,000,000

19(Base Project Allocation -
20$10,000,000)

 

21(b) Port projects.--Additional capital projects in the
22category of improvement projects for ports to be constructed or
23acquired by the Department of Transportation, its successors or
24assigns, and to be financed by the incurring of debt, are hereby
25itemized, together with their respective estimated financial
26costs, as follows:

27 

28Project

Total Project

Allocation

29(1) Erie County

 

30(i) Erie Inland Port

 

1(A) Construct rail improvements and ship
2loading infrastructure at the Port of
3Erie

 

4Project Allocation

9,000,000

5(Base Project Allocation - $9,000,000)

 

6(B) Construct rail improvements and
7replace rail bridge at Erie Inland
8Port-Albion site

 

9Project Allocation

12,000,000

10(Base Project Allocation -
11$12,000,000)

 

<-12(2) Philadelphia County

 

13(i) Philadelphia Regional Port Authority

 

14(A) Land acquisition, expansion, design,
15construction and general improvements
16to port facilities

 

17Project Allocation

493,200,000

18(Base Project Allocation -
19$493,200,000)

 

20(B) Main channel deepening project

 

21Project Allocation

97,800,000

22(Base Project Allocation -
23$97,800,000)

 

24Section 4. Itemization of furniture and equipment projects.

25Additional capital projects in the category of public
26improvement projects consisting of the acquisition of movable
27furniture and equipment to complete public improvement projects
28and to be purchased by the Department of General Services, its
29successor or assigns and to be financed by the incurring of debt
30are hereby itemized, together with their respective estimated

1financial costs, as follows:

2 

3Project

Total Project

Allocation

4(1) Department of Conservation and Natural
5Resources

 

6(i) Kinzua Bridge State Park

 

7(A) Original furniture and equipment for
8new office/visitor center for public
9and staff use

 

10Project Allocation

3,000,000

11(Base Project Allocation - $2,400,000)

 

12(Design & Contingencies - $600,000)

 

13(ii) Ohiopyle State Park

 

14(A) Original furniture and equipment for
15Project DGS 166-9, Ohiopyle State Park
16Visitors' Center

 

17Project Allocation

220,000

18(Base Project Allocation - $220,000)

 

19(iii) S. B. Elliott State Park

 

20(A) Additional funding for purchase of
21exhibits, furnishings and equipment
22for visitor center and overnight
23facilities

 

24Project Allocation

3,500,000

25(Base Project Allocation - $2,800,000)

 

26(Design & Contingencies - $700,000)

 

27(iv) Sinnemahoning State Park

 

28(A) Purchase of exhibits, furnishings and
29equipment for visitor center and
30office

 

1Project Allocation

2,000,000

2(Base Project Allocation - $1,600,000)

 

3(Design & Contingencies - $400,000)

 

4(2) Department of Education

 

5(i) Lincoln University

 

6(A) Original furniture and equipment
7associated with renovation of Center
8for the Study of Black Culture

 

9Project Allocation

4,000,000

10(Base Project Allocation - $3,200,000)

 

11(Design & Contingencies - $800,000)

 

12(B) Provide necessary furniture and
13equipment associated with renovation
14of Alumni House

 

15Project Allocation

5,000,000

16(Base Project Allocation - $4,000,000)

 

17(Design & Contingencies - $1,000,000)

 

18(ii) Temple University

 

19(A) Original furniture and equipment
20associated with renovation of
21Tomlinson Hall

 

22Project Allocation

450,000

23(Base Project Allocation - $360,000)

 

24(Design & Contingencies - $90,000)

 

25(B) Original furniture and equipment
26associated with design and
27construction of Center for Scholars

 

28Project Allocation

300,000

29(Base Project Allocation - $300,000)

 

30(iii) Thaddeus Stevens College of Technology

 

1(A) Original furniture and equipment
2associated with design and
3construction of technology center

 

4Project Allocation

2,000,000

5(Base Project Allocation - $2,000,000)

 

6(iv) The Pennsylvania State University

 

7(A) Original furniture and equipment for
8state-of-the-art research and teaching
9space for College of Liberal Arts

 

10Project Allocation

8,100,000

11(Base Project Allocation - $8,100,000)

 

12(B) Original furniture and equipment for
13building entrance and security systems
14project, including key access boxes
15and video surveillance cameras

 

16Project Allocation

1,500,000

17(Base Project Allocation - $1,500,000)

 

18(C) Original furniture and equipment for
19chilled water expansion project for
20University Park campus

 

21Project Allocation

1,000,000

22(Base Project Allocation - $1,000,000)

 

23(D) Original furniture and equipment for
24new classroom/class lab building at
25University Park campus

 

26Project Allocation

7,700,000

27(Base Project Allocation - $7,700,000)

 

28(E) Additional funding for furniture and
29equipment for computer building at
30University Park campus

 

1Project Allocation

1,500,000

2(Base Project Allocation - $1,500,000)

 

3(F) Original furniture and equipment for
4general computing Tier III<- data center

 

5Project Allocation

13,000,000

6(Base Project Allocation -
7$13,000,000)

 

8(G) Additional funding for furniture and
9equipment for Henning Building

 

10Project Allocation

2,250,000

11(Base Project Allocation - $2,250,000)

 

12(H) Capital renewal for Kostos Building

 

13Project Allocation

1,800,000

14(Base Project Allocation - $1,800,000)

 

15(I) Capital renewal for Baker Engineering
16& Science Building

 

17Project Allocation

1,400,000

18(Base Project Allocation - $1,400,000)

 

19(J) Original furniture and equipment for
20new Recital Hall addition and Music I

 

21Project Allocation

3,300,000

22(Base Project Allocation - $3,300,000)

 

23(K) Original furniture and equipment for
24Ruhl Student/Community Center and
25multipurpose building upgrades

 

26Project Allocation

1,600,000

27(Base Project Allocation - $1,600,000)

 

28(L) Original furniture and equipment for
29Student Union Building at Brandywine

 

30Project Allocation

2,400,000

1(Base Project Allocation - $2,400,000)

 

2(M) Capital renewal for waste water
3treatment plant located at University
4Park campus

 

5Project Allocation

1,000,000

6(Base Project Allocation - $1,000,000)

 

7(N) Additional funding for furniture and
8equipment for water treatment plant
9located at University Park campus

 

10Project Allocation

1,000,000

11(Base Project Allocation - $1,000,000)

 

12(O) Original furniture and equipment for
13Pattee Library Knowledge Commons at
14University Park

 

15Project Allocation

1,500,000

16(Base Project Allocation - $1,500,000)

 

17(P) Provide for necessary furniture and
18equipment associated with design and
19construction of Milton S. Hershey Data
20Center

 

21Project Allocation

2,400,000

22(Base Project Allocation - $2,400,000)

 

<-23(Q) Original furniture and equipment for
24state-of-the-art research and teaching
25space for College of Agricultural
26Sciences.

 

27Project Allocation

12,000,000

28(Base Project Allocation -
29$12,000,000)

 

<-30(R) Original furniture and equipment for

 

1state-of-the-art research and teaching
2space for College of Engineering

 

3Project Allocation

15,000,000

4(Base Project Allocation -
5$15,000,000)

 

6(2.1) Department of General Services

 

7(i) Family Court Complex, Philadelphia

 

8(A) Provide the necessary furniture and
9equipment associated with construction
10of Family Court Complex in
11Philadelphia

 

12Project Allocation

22,000,000

13(Base Project Allocation -
14$22,000,000)

 

15(3) Pennsylvania Historical and Museum
16Commission

 

17(i) Landis Valley Village and Museum

 

18(A) Original furniture and equipment for
19new visitor center

 

20Project Allocation

1,500,000

21(Base Project Allocation - $1,500,000)

 

22(ii) Railroad Museum of Pennsylvania

 

23(A) Original equipment for new rolling
24stock storage facility

 

25Project Allocation

1,200,000

26(Base Project Allocation - $1,200,000)

 

27(iii) Southeastern Veterans Center, Chester
28County

 

29(A) Provide original furniture and
30equipment to fully equip new

 

1maintenance building

 

2Project Allocation

200,000

3(Base Project Allocation - $200,000)

 

4(4) State System of Higher Education

 

5(i) Bloomsburg University

 

6(A) Original furniture and equipment
7associated with renovation of
8McCormick Center

 

9Project Allocation

2,500,000

10(Base Project Allocation - $2,500,000)

 

11(ii) California University of Pennsylvania

 

12(A) Original furniture and equipment
13associated with renovation of Coover
14Hall

 

15Project Allocation

2,000,000

16(Base Project Allocation - $2,000,000)

 

17(B) Original furniture and equipment
18associated with renovation of South
19Hall and Old Main

 

20Project Allocation

3,500,000

21(Base Project Allocation - $3,500,000)

 

22(iii) Cheyney University

 

23(A) Original furniture and equipment
24associated with renovation of Cope
25Hall

 

26Project Allocation

5,000,000

27(Base Project Allocation - $5,000,000)

 

28(iv) Clarion University

 

29(A) Original furniture and equipment
30associated with renovation of Marwick-

 


1Boyd Fine Arts Center

 

2Project Allocation

4,000,000

3(Base Project Allocation - $4,000,000)

 

4(v) East Stroudsburg University

 

5(A) Original furniture and equipment
6associated with construction of
7Information Commons

 

8Project Allocation

8,000,000

9(Base Project Allocation - $8,000,000)

 

<-10(vi) Edinboro University

 

11(A) Original furniture and equipment
12associated with renovation and
13addition of Porreco Center

 

14Project Allocation

500,000

15(Base Project Allocation - $500,000)

 

16(vi) <-(vii) Indiana University of Pennsylvania

 

17(A) Original furniture and equipment
18associated with renovation of
19Stapleton/Stabley Library

 

20Project Allocation

5,000,000

21(Base Project Allocation - $5,000,000)

 

22(B) Provide for necessary furniture and
23equipment associated with renovation
24of Weyant/Walsh Halls

 

25Project Allocation

2,000,000

26(Base Project Allocation - $2,000,000)

 

27(vii) <-(viii) Kutztown University

 

28(A) Original furniture and equipment
29associated with renovation of Lytle
30Hall

 

1Project Allocation

3,000,000

2(Base Project Allocation - $3,000,000)

 

3(B) Original furniture and equipment
4associated with renovation of Poplar
5House

 

6Project Allocation

1,000,000

7(Base Project Allocation - $1,000,000)

 

8(viii) <-(ix) Mansfield University

 

9(A) Original furniture and equipment
10associated with construction of new
11student housing

 

12Project Allocation

2,000,000

13(Base Project Allocation - $2,000,000)

 

14(ix) <-(x) Slippery Rock University

 

15(A) Original furniture and equipment
16associated with renovation of Student
17Success Center

 

18Project Allocation

2,800,000

19(Base Project Allocation - $2,800,000)

 

20Section 5. Itemization of transportation assistance projects.

21(a) Mass transit.--Additional capital projects in the
22category of transportation assistance projects for mass transit
23in which an interest is to be acquired or constructed by the
24Department of Transportation, its successors or assigns and to
25be financed by the incurring of debt are hereby itemized,
26together with their estimated financial costs, as follows:

27 

28Project

Total Project

Allocation

<-29(1) Adams County Transit Authority

 

30(i) Design, construction and other related

 

1costs for multimodal transportation
2facility for Freedom Transit, ACTA Para-
3transit, intercity buses, automobiles and
4bicycles to provide off-street parking for
5both public and private users, as well as
6to accommodate overflow parking from the
7Gettysburg National Military Park, Borough
8of Gettysburg

 

9Project Allocation

3,000,000

10(Base Project Allocation - $3,000,000)

 

11(1) <-(1.1) Allegheny County

 

12(i) High-density redevelopment at new and
13existing transit stops along proposed Bus
14Rapid Transit Route and Lightrail and
15Busway stops in City of Pittsburgh

 

16Project Allocation

20,000,000

17(Base Project Allocation -
18$20,000,000)

 

<-19(ii) Acquisition, construction,
20infrastructure, redevelopment and other
21related costs for multimodal public
22transportation facility

 

23Project Allocation

5,000,000

24(Base Project Allocation - $5,000,000)

 

25(2) Area Transportation Authority

 

26(i) Provide for facility and facility
27upgrades, including mobility management
28center, terminals, fuel storage, parking
29lots, fueling depots, roof replacement and
30miscellaneous equipment

 

1Project Allocation

2,253,000

2(Base Project Allocation - $2,028,000)

 

3(Design & Contingencies - $225,000)

 

4(ii) Upgrade and renovate Dubois facility to
5bring to state of good repair

 

6Project Allocation

959,000

7(Base Project Allocation - $863,000)

 

8(Design & Contingencies - $96,000)

 

9(iii) Construct terminals

 

10Project Allocation

1,162,000

11(Base Project Allocation - $1,162,000)

 

12(iv) Mobility Management Center, to match
13discretionary Federal capital funding to
14rehabilitate infrastructure throughout
15system

 

16Project Allocation

1,066,000

17(Base Project Allocation - $959,000)

 

18(Design & Contingencies - $107,000)

 

19(v) Bus Purchase Program, provide for
20replacement of buses that have exceeded
21their useful life

 

22Project Allocation

2,464,000

23(Base Project Allocation - $2,218,000)

 

24(Design & Contingencies - $246,000)

 

<-25(2.1) Beaver County Transit Authority

 

26(i) Construction, infrastructure and other
27related costs for natural gas fueling
28station in Center Township

 

29Project Allocation

2,000,000

30(Base Project Allocation - $2,000,000)

 

1(3) Butler Transit Authority

 

2(i) Expand Cranberry Area Park and Ride
3Facility on Route 528 near I-79, Butler
4County, including property acquisition and
5construction

 

6Project Allocation

450,000

7(Base Project Allocation - $405,000)

 

8(Design & Contingencies - $45,000)

 

9(ii) Provide for infrastructure improvements,
10facility upgrades for bus storage and
11maintenance areas, construction of public
12waiting area, training room, park and ride
13facility and compressed natural gas (CNG)
14refueling station and purchase of four 45-
15foot Coach CNG buses.

 

16Project Allocation

1,700,000

17(Base Project Allocation - $1,700,000)

 

18(4) Cambria County Transit Authority

 

19(i) Replace transit facility in Johnstown to
20meet current standards and requirements

 

21Project Allocation

2,419,000

22(Base Project Allocation - $2,177,000)

 

23(Design & Contingencies - $242,000)

 

24(ii) Construct transit facility

 

25Project Allocation

3,871,000

26(Base Project Allocation - $3,871,000)

 

27(iii) Construction and infrastructure
28improvements for new facility and bus
29replacement projects for Camtran

 

30Project Allocation

7,000,000

1(Base Project Allocation - $7,000,000)

 

2(iv) Replace track ties and other
3improvements

 

4Project Allocation

271,000

5(Base Project Allocation - $244,000)

 

6(Design & Contingencies - $27,000)

 

7(v) Replace fare collection system

 

8Project Allocation

78,000

9(Base Project Allocation - $70,000)

 

10(Design & Contingencies - $8,000)

 

11(5) Capital Area Transit Authority

 

12(i) Replace CAT's transit facility to meet
13modern requirements

 

<-14Project Allocation

7,742,000

15(Base Project Allocation - $6,968,000)

 

16(Design & Contingencies - $774,000)

 

<-17Project Allocation

47,742,000

18(Base Project Allocation -
19$42,968,000)

 

20(Design & Contingencies - $4,774,000)

 

21(ii) Upgrade transportation technology for
22vehicle monitoring and real-time
23information for CAT's transit operations

 

24Project Allocation

1,935,000

25(Base Project Allocation - $1,742,000)

 

26(Design & Contingencies - $193,000)

 

27(6) Centre Area Transportation Authority

 

28(i) Expand CATA's maintenance and bus storage
29areas

 

30Project Allocation

968,000

1(Base Project Allocation - $871,000)

 

2(Design & Contingencies - $97,000)

 

3(ii) Acquisition of replacement buses

 

4Project Allocation

1,600,000

5(Base Project Allocation - $1,600,000)

 

6(iii) Rehabilitate or replace various
7facilities and infrastructure

 

8Project Allocation

30,000,000

9(Base Project Allocation -
10$24,000,000)

 

11(Design & Contingencies - $6,000,000)

 

12(iv) Acquisition of compressed natural gas
13(CNG) buses

 

14Project Allocation

5,700,000

15(Base Project Allocation - $5,700,000)

 

<-16(6.1) Chester County

 

17(i) Acquisition, construction and related
18costs of Darby Road extension and Paoli
19Transit Center projects in Tredyffrin
20Township

 

21Project Allocation

30,000,000

22(Base Project Allocation -
23$30,000,000)

 

24(7) County of Lackawanna Transit System

 

25(i) Acquisition, construction, infrastructure
26and other costs related to compressed
27natural gas fueling station and
28maintenance facility

 

29Project Allocation

6,000,000

30(Base Project Allocation - $6,000,000)

 

1(ii) Acquisition, construction,
2infrastructure and other costs related to
3intermodal transportation center

 

4Project Allocation

1,000,000

5(Base Project Allocation - $1,000,000)

 

6(8) Crawford Area Transportation Authority

 

7(i) Construct steel structure sheltered bus
8storage facility and wash bay for bus
9fleet

 

10Project Allocation

387,000

11(Base Project Allocation - $348,000)

 

12(Design & Contingencies - $39,000)

 

13(9) Erie Metropolitan Transit Authority

 

14(i) Construct new operations facility,
15including infrastructure

 

16Project Allocation

1,796,000

17(Base Project Allocation - $1,616,000)

 

18(Design & Contingencies - $180,000)

 

19(9.1) Lebanon Transit

 

20(i) Rehabilitate building and grounds,
21including maintenance garage roof

 

22Project Allocation

406,000

23(Base Project Allocation - $365,000)

 

24(Design & Contingencies - $41,000)

 

25(10) Lehigh and Northampton Transportation
26Authority

 

27(i) Construct new operations facility,
28including infrastructure at Allentown
29operating facility

 

30Project Allocation

2,517,000

1(Base Project Allocation - $2,265,000)

 

2(Design & Contingencies - $252,000)

 

3(ii) Transit vehicle purchase, provide
4funding for purchase of transit buses

 

5Project Allocation

1,646,000

6(Base Project Allocation - $1,481,000)

 

7(Design & Contingencies - $165,000)

 

<-8(10.1) Lycoming County

 

9(i) Construction, infrastructure and other
10related costs for replacing existing cast
11in place culvert which carries Lawshee Run
12under several borough streets and
13sidewalks, including repairs to streets
14and replacement of sidewalks in Jersey
15Shore Borough

 

16Project Allocation

2,800,000

17(Base Project Allocation - $2,800,000)

 

18(11) Mid-County Transit Authority

 

19(i) Construct bus storage facility

 

20Project Allocation

215,000

21(Base Project Allocation - $215,000)

 

22(12) Mid Mon Valley Transit Authority

 

23(i) Rehabilitate bus storage, phase II,
24including construction to rehabilitate
25existing bus storage, administration and
26passenger areas at Donora transit facility

 

27Project Allocation

1,160,000

28(Base Project Allocation - $1,044,000)

 

29(Design & Contingencies - $116,000)

 

30(ii) Construct Donora Phase II project

 

1Project Allocation

965,000

2(Base Project Allocation - $965,000)

 

3(iii) Replace revenue rolling stock that has
4outlived its useful life as part of Phase
5II of rehabilitation of Donora Transit
6Facility

 

7Project Allocation

364,000

8(Base Project Allocation - $328,000)

 

9(Design & Contingencies - $36,000)

 

10(13) Monroe County Transit Agency

 

11(i) Construct new bus storage facility and
12staging area

 

13Project Allocation

968,000

14(Base Project Allocation - $871,000)

 

15(Design & Contingencies - $97,000)

 

16(14) Montgomery County

 

17(i) Construction, infrastructure improvements
18and other costs related to expansion of
19Ardmore Train Station transit and parking
20improvements project

 

21Project Allocation

10,000,000

22(Base Project Allocation -
23$10,000,000)

 

<-24(14.1) Northampton County

 

25(i) Installation of traffic light at
26intersection of Polk Valley Road and Route
27412 in Lower Saucon Township

 

28Project Allocation

450,000

29(Base Project Allocation - $450,000)

 

30(15) Philadelphia County

 

1(i) Infrastructure improvements, including
2equipment upgrades for Phlash Trolley
3fleet

 

4Project Allocation

235,000

5(Base Project Allocation - $235,000)

 

6(16) Port Authority of Allegheny County

 

7(i) FY 2011-2012 Section 5307 Program,
8replacement and rehabilitation of major
9components of bus and fixed guideway
10system

 

11Project Allocation

7,341,000

12(Base Project Allocation - $6,607,000)

 

13(Design & Contingencies - $734,000)

 

14(ii) FY 2011-2012 Section 5309 Program,
15replacement and rehabilitation of major
16components within Port Authority's rail
17and busway system, including North Shore
18Connector project

 

19Project Allocation

6,000,000

20(Base Project Allocation - $5,400,000)

 

21(Design & Contingencies - $600,000)

 

22(iii) FY 2011-2012 Section 5307 Flex Program,
23to provide funding of replacement buses
24and standardize bus procurement program

 

25Project Allocation

1,493,000

26(Base Project Allocation - 1,344,000)

 

27(Design & Contingencies - 149,000)

 

28(iv) FY 2011-2012 Section 5309 Bus and Bus
29Facilities Program, utilization of bus and
30bus facilities earmarks to perform various

 

1bus upgrades and facility improvements

 

2Project Allocation

1,161,000

3(Base Project Allocation - $1,045,000)

 

4(Design & Contingencies - $116,000)

 

5(v) Infrastructure Safety Renewal Program, to
6restore PAAC's transit and railroad
7infrastructure, including maintenance
8support facilities

 

9Project Allocation

16,000,000

10(Base Project Allocation -
11$14,400,000)

 

12(Design & Contingencies - $1,600,000)

 

13(vi) Vehicle Overhaul Program

 

14Project Allocation

7,419,000

15(Base Project Allocation - $6,678,000)

 

16(Design & Contingencies - $741,000)

 

17(vii) FY 2011-2012 Section 5307 Program, for
18replacement and rehabilitation of major
19components of bus and fixed guideway
20system

 

21Project Allocation

13,706,000

22(Base Project Allocation -
23$12,335,000)

 

24(Design & Contingencies - $1,371,000)

 

25(viii) FY 2011-2012 Section 5309 Program, for
26replacement and rehabilitation of major
27components within Port Authority's rail
28and busway system to ensure safety and
29reliability, including North Shore
30Connector project

 

1Project Allocation

11,756,000

2(Base Project Allocation -
3$10,580,000)

 

4(Design & Contingencies - $1,176,000)

 

5(ix) FY 2011-2012 Section 5307 Flex Program,
6to provide funding for match of Federal
7and local funding

 

8Project Allocation

1,493,000

9(Base Project Allocation - $1,344,000)

 

10(Design & Contingencies - $149,000)

 

11(x) FY 2011-2012 Section 5309 Bus and Bus
12Facilities Program, to provide for
13utilization of bus and bus facilities
14earmarks to perform various bus upgrades
15and facility improvements

 

16Project Allocation

1,403,000

17(Base Project Allocation - $1,263,000)

 

18(Design & Contingencies - $140,000)

 

19(xi) Infrastructure Safety Renewal Program,
20to provide funding to restore PAAC's
21transit and railroad infrastructure,
22including maintenance support facilities

 

23Project Allocation

45,484,000

24(Base Project Allocation -
25$41,000,000)

 

26(Design & Contingencies - $4,484,000)

 

27(xii) Vehicle Overhaul Program, to provide
28for PAAC's major overhaul of rolling stock

 

29Project Allocation

5,000,000

30(Base Project Allocation - $4,500,000)

 

1(Design & Contingencies - $500,000)

 

2(xiii) Section 5307 Program, to match
3discretionary Federal capital and local
4funding for replacement of major
5components of bus and fixed guideway
6systems

 

7Project Allocation

4,723,000

8(Base Project Allocation - $4,251,000)

 

9(Design & Contingencies - $472,000)

 

10(xiv) Section 5309 Program, to match Federal
11capital funds to replace buses and
12rehabilitate various facilities and
13infrastructure

 

14Project Allocation

678,000

15(Base Project Allocation - $610,000)

 

16(Design & Contingencies - $68,000)

 

17(xv) Section 5307 Program, to match
18discretionary Federal capital funding to
19purchase 70 replacement buses annually

 

20Project Allocation

1,493,000

21(Base Project Allocation - $1,344,000)

 

22(Design & Contingencies - $149,000)

 

23(xvi) Federal Grant Program, to match
24discretionary Federal capital and local
25funding to rehabilitate or replace
26existing facilities and infrastructure

 

27Project Allocation

5,601,000

28(Base Project Allocation - $5,041,000)

 

29(Design & Contingencies - $560,000)

 

30(16.1) Red Rose Transit Authority

 

1(i) Purchase buses, to provide for
2replacement of buses

 

3Project Allocation

1,887,000

4(Base Project Allocation - $1,698,000)

 

5(Design & Contingencies - $189,000)

 

6(17) River Valley Transit

 

7(i) Expand Trade and Transit Center and
8Church Street Transportation Intermodal
9Center

 

10Project Allocation

1,161,000

11(Base Project Allocation - $1,045,000)

 

12(Design & Contingencies - $116,000)

 

13(ii) Expand Trade and Transit Center

 

14Project Allocation

1,459,000

15(Base Project Allocation - $1,313,000)

 

16(Design & Contingencies - $146,000)

 

17(iii) Construct compressed natural gas
18fueling station and purchase four CNG
19transit vehicles

 

20Project Allocation

1,042,000

21(Base Project Allocation - $937,800)

 

22(Design & Contingencies - $104,200)

 

23(18) Southeastern Pennsylvania Transportation
24Authority

 

25(i) FFY 2012 Section 5307 Formula Program of
26Prospects, including state of good repair,
27vehicle overhaul, regional rail signal
28mechanization, system improvements, bus
29purchase and paratransit vehicle purchase
30programs

 

1Project Allocation

23,831,000

2(Base Project Allocation -
3$21,448,000)

 

4(Design & Contingencies - $2,383,000)

 

5(ii) FFY 2012 Section 5309 Rail Modernization
6Program, including state of good repair,
7vehicle overhaul, regional rail signal
8mechanization, system improvements,
9transit and regional rail station and
10station accessibility programs

 

11Project Allocation

24,170,000

12(Base Project Allocation -
13$21,753,000)

 

14(Design & Contingencies - $2,417,000)

 

15(iii) FFY 2012 Bus Purchase Program,
16including acquisition and replacement of
17buses

 

18Project Allocation

4,133,000

19(Base Project Allocation - $3,720,000)

 

20(Design & Contingencies - $413,000)

 

21(iv) FFY 2012 Federal Highway Flex Program,
22including funds for SEPTA's
23railroad/highway grade crossings and for
24CMAQ projects that help meet requirements
25of the Clean Air Act

 

26Project Allocation

774,000

27(Base Project Allocation - $697,000)

 

28(Design & Contingencies - $77,000)

 

29(v) Federal Competitive Grant Program, to
30provide for State funds to match Federal

 

1capital funding awarded through
2competitive grant programs

 

3Project Allocation

15,839,000

4(Base Project Allocation -
5$14,255,000)

 

6(Design & Contingencies - $1,584,000)

 

7(vi) FY 2012-2013 State of Good Repair
8Program, to bring transit and railroad
9facilities to a state of good repair,
10including communications, track right-of-
11way, station facilities, environmental
12concerns and bridges

 

13Project Allocation

24,174,000

14(Base Project Allocation -
15$21,755,000)

 

16(Design & Contingencies - $2,419,000)

 

17(vii) Infrastructure Safety Renewal Program,
18to restore SEPTA's transit and railroad
19infrastructure, including maintenance
20support facilities

 

21Project Allocation

31,936,000

22(Base Project Allocation -
23$28,742,000)

 

24(Design & Contingencies - $3,194,000)

 

25(viii) FY 2011-2012 Vehicle Overhaul Program

 

26Project Allocation

53,226,000

27(Base Project Allocation -
28$47,903,000)

 

29(Design & Contingencies - $5,323,000)

 

30(ix) FFY 2013 Formula Program of Projects, to

 

1provide for SEPTA's State funds to match
2Federal capital funding to replace buses
3and rehabilitate various facilities and
4infrastructure to bring to state of good
5repair

 

6Project Allocation

23,226,000

7(Base Project Allocation -
8$20,903,000)

 

9(Design & Contingencies - $2,323,000)

 

10(x) FFY 2013 Rail Modernization Program, to
11provide for SEPTA's state of good repair
12program, vehicle overhaul program,
13regional rail signal mechanization, system
14improvements program, transit and regional
15rail station program and station
16accessibility program

 

17Project Allocation

23,226,000

18(Base Project Allocation -
19$20,903,000)

 

20(Design & Contingencies - $2,323,000)

 

21(xi) FFY 2013 Bus Purchase Program, to
22provide for acquisition and replacement of
23buses for SEPTA services

 

24Project Allocation

4,133,000

25(Base Project Allocation - $3,720,000)

 

26(Design & Contingencies - $413,000)

 

27(xii) Federal Competitive Grant Program, to
28provide for State funds to match Federal
29capital funding awarded through
30competitive grant programs by improving

 

1air quality and removing congestion

 

2Project Allocation

17,420,000

3(Base Project Allocation -
4$15,678,000)

 

5(Design & Contingencies - $1,742,000)

 

6(xiii) Federal Competitive Clean Fuel
7Program, to provide for State funds to
8match discretionary Federal capital
9funding to replace existing vehicles with
10clean fuel vehicles to bring to state of
11good repair

 

12Project Allocation

1,452,000

13(Base Project Allocation - $1,307,000)

 

14(Design & Contingencies - $145,000)

 

15(xiv) FY 2013-2014 Safety Renewal Program, to
16provide funds to rehabilitate or replace
17existing facilities and infrastructure to
18bring to state of good repair

 

19Project Allocation

33,872,000

20(Base Project Allocation -
21$30,485,000)

 

22(Design & Contingencies - $3,387,000)

 

23(xv) FY 2013-2014 State of Good Repair
24Program, to provide funds to rehabilitate
25or replace existing facilities and
26infrastructure to bring to state of good
27repair

 

28Project Allocation

19,356,000

29(Base Project Allocation -
30$17,420,000)

 

1(Design & Contingencies - $1,936,000)

 

2(xvi) Vehicle Overhaul Program, to provide
3for SEPTA's 2013-2014 Vehicle Overhaul
4Program which provides for major overhaul
5of rolling stock

 

6Project Allocation

53,227,000

7(Base Project Allocation -
8$47,904,000)

 

9(Design & Contingencies - $5,323,000)

 

10(xvii) FY 2012-2013 State of Good Repair
11Program, to provide funds to rehabilitate
12or replace existing facilities and
13infrastructure to bring to state of good
14repair

 

15Project Allocation

24,194,000

16(Base Project Allocation -
17$21,775,000)

 

18(Design & Contingencies - $2,419,000)

 

19(xviii) Infrastructure Safety Renewal
20Program, to provide for restoration of
21SEPTA's transit and railroad
22infrastructure, including maintenance
23support facilities

 

24Project Allocation

31,936,000

25(Base Project Allocation -
26$28,742,000)

 

27(Design & Contingencies - $3,194,000)

 

28(xix) Vehicle Overhaul Program, to provide
29for SEPTA's 2012-2013 Vehicle Overhaul
30Program which provides for major overhaul

 

1of rolling stock

 

2Project Allocation

53,227,000

3(Base Project Allocation -
4$47,904,000)

 

5(Design & Contingencies - $5,323,000)

 

6(xx) FY 2012-2013 Infrastructure Safety
7Renewal Program, to provide for
8restoration of SEPTA's transit and
9railroad infrastructure, including
10maintenance support facilities

 

11Project Allocation

31,936,000

12(Base Project Allocation -
13$28,742,000)

 

14(Design & Contingencies - $3,194,000)

 

15(xxi) Commuter rail expansion project, Phase
161 -- Elwyn to Wawa

 

17Project Allocation

16,500,000

18(Base Project Allocation -
19$15,000,000)

 

20(Design & Contingencies - $1,500,000)

 

21(xxii) Commuter rail expansion project, Phase
222 -- Wawa to West Chester

 

23Project Allocation

16,500,000

24(Base Project Allocation -
25$15,000,000)

 

26(Design & Contingencies - $1,500,000)

 

27(xxiii) Urbanized Area of Formula Program, to
28match Federal capital funding and to
29replace buses and rehabilitate various
30facilities and infrastructure

 

1Project Allocation

47,614,000

2(Base Project Allocation -
3$42,853,000)

 

4(Design & Contingencies - $4,761,000)

 

5(xxiv) State of Good Repair Program, to
6provide for the State of Good Repair
7Program and Facilities Overhaul Program
8and to to rehabilitate or replace various
9facilities and infrastructure

 

10Project Allocation

51,098,000

11(Base Project Allocation -
12$45,988,000)

 

13(Design & Contingencies - $5,110,000)

 

14(xxv) Bus and Bus Facilities Program, to
15match Federal capital funding and replace
16buses and rehabilitate various facilities
17and infrastructure

 

18Project Allocation

3,484,000

19(Base Project Allocation - $3,136,000)

 

20(Design & Contingencies - $348,000)

 

21(xxvi) Bus Purchase Flex Program, to match
22Federal funds to replace buses and
23rehabilitate various facilities and
24infrastructure

 

25Project Allocation

8,267,000

26(Base Project Allocation - $7,440,000)

 

27(Design & Contingencies - $827,000)

 

28(xxvii) Federal Grant Program, to match
29discretionary Federal capital funding to
30rehabilitate or replace existing

 

1facilities and infrastructure

 

2Project Allocation

1,452,000

3(Base Project Allocation - $1,307,000)

 

4(Design & Contingencies - $145,000)

 

5(xxviii) Infrastructure Safety Renewal
6Program, to provide for transit and
7railroad infrastructure, including
8maintenance support facilities

 

9Project Allocation

67,744,000

10(Base Project Allocation -
11$60,970,000)

 

12(Design & Contingencies - $6,774,000)

 

13(xxix) Fiscal year 2014-2015 State of Good
14Repair Program, to provide for the State
15of Good Repair Program and Facilities
16Overhaul Program and to rehabilitate or
17replace various facilities and
18infrastructure

 

19Project Allocation

19,356,000

20(Base Project Allocation -
21$17,420,000)

 

22(Design & Contingencies - $1,936,000)

 

23(xxx) Vehicle Overhaul Program, to provide
24for fiscal year 2013-2014 Vehicle Overhaul
25Program

 

26Project Allocation

53,266,000

27(Base Project Allocation -
28$47,903,000)

 

29(Design & Contingencies - $5,323,000)

 

30(xxxi) Federal Grant Program, provide State

 

1funds to match discretionary Federal
2capital funding to rehabilitate or replace
3existing assets

 

4Project Allocation

4,839,000

5(Base Project Allocation - $4,355,000)

 

6(Design & Contingencies - $484,000)

 

7(19) Department of Transportation

 

8(i) Vehicle and Capital Equipment Program, to
9provide funding match for non-Federal
10projects for purchase of transit vehicles
11and other capital equipment and
12infrastructure

 

13Project Allocation

50,000,000

14(Base Project Allocation -
15$45,000,000)

 

16(Design & Contingencies - $5,000,000)

 

17(ii) Provide funding for capital improvements
18and capital maintenance to Keystone
19Corridor, including interlockings and
20stations

 

21Project Allocation

15,000,000

22(Base Project Allocation -
23$13,500,000)

 

24(Design & Contingencies - $1,500,000)

 

25(iii) Vehicle and Capital Equipment Program,
26to provide funding match for Federal
27projects for purchase of transit vehicles
28and other capital equipment and
29infrastructure

 

30Project Allocation

50,000,000

1(Base Project Allocation -
2$45,000,000)

 

3(Design & Contingencies - $5,000,000)

 

4(iv) Alternative Fuel Vehicles Program,
5provide for CNG, equipment and
6infrastructure to support alternate fuel
7vehicles for various transit authorities
8across this Commonwealth

 

9Project Allocation

50,000,000

10(Base Project Allocation -
11$50,000,000)

 

12(19.1) Washington City Transit

 

13(i) Improve transit facilities, to provide
14for purchase of passenger amenities

 

15Project Allocation

58,000

16(Base Project Allocation - $52,000)

 

17(Design & Contingencies - $6,000)

 

18(ii) Purchase equipment, to provide for
19purchase of new equipment for additional
20transit staff

 

21Project Allocation

24,000

22(Base Project Allocation - $22,000)

 

23(Design & Contingencies - $2,000)

 

24(20) York County Transportation Authority

 

25(i) Renovate transit operations
26center/maintenance facility

 

27Project Allocation

8,710,000

28(Base Project Allocation - $7,839,000)

 

29(Design & Contingencies - $871,000)

 

30(ii) Purchase buses, to provide for

 

1replacement of fixed-route vehicles

 

2Project Allocation

1,348,000

3(Base Project Allocation - $1,213,000)

 

4(Design & Contingencies - $135,000)

 

5(b) Rural and intercity rail.--Additional capital projects
6in the category of transportation assistance projects for rural
7and intercity rail service projects to be constructed or with
8respect to which an interest is to be acquired by the Department
9of Transportation, its successors or assigns and to be financed
10by the incurring of debt are hereby itemized, together with
11their respective estimated financial costs, as follows:

12 

13Project

Total Project

Allocation

14(1) Allegheny County

 

15(i) City of Pittsburgh

 

16(A) High-density redevelopment at new and
17existing transit stops along proposed
18Bus Rapid Transit Route and Lightrail
19and Busway stops in City of Pittsburgh

 

20Project Allocation

20,000,000

21(Base Project Allocation -
22$20,000,000)

 

23(ii) Three Rivers Marine & Rail Terminals

 

24(A) Rail rehabilitation, including track

25infrastructure improvements, upgrade
26ballast, ties and surface and align
27tracks for Glassport Terminal rail
28expansion project

 

29Project Allocation

1,500,000

30(Base Project Allocation - $1,500,000)

 

1(2) Allegheny, Fayette, Washington and
2Westmoreland Counties

 

3(i) Wheeling & Lake Erie Railroad

 

4(A) Upgrade existing infrastructure and
5construct new capacity for projected
6increases in car loadings and new
7customer development, including
8engineering, site preparation,
9grading, rail, ties, ballast,
10switches, signals, crossings, bridges,
11tunnels, slope stabilization and other
12related materials

 

13Project Allocation

10,000,000

14(Base Project Allocation -
15$10,000,000)

 

16(3) Allegheny, Butler and Washington Counties

 

17(i) Allegheny Valley Railroad

 

18(A) Rehabilitate and build railroad
19infrastructure to enhance operational
20capacity, including acquisition of
21land, planning and engineering, rail,
22crossties, roadbed, drainage,
23interchanges, lubricators, sidings,
24public delivery tracks, bridges,
25tunnels, crossings, freight yard
26modification and expansion

 

27Project Allocation

8,000,000

28(Base Project Allocation - $8,000,000)

 

29(3.1) Allegheny and Washington Counties

 

30(i) Pittsburgh and Ohio Central Railroad

 

1(A) Rehabilitation, including ties, rail,
2surface, bridge, switches, ditching,
3undercutting, brush cutting, road
4crossings, signal and communication
5and related work

 

6Project Allocation

4,900,000

7(Base Project Allocation - $4,900,000)

 

8(B) Rail construction or rehabilitation,
9including switches, ties, rail,
10surface, bridge, switches, ditching,
11undercutting, brush cutting, road
12crossings, signal and communication
13and related work

 

14Project Allocation

7,000,000

15(Base Project Allocation - $7,000,000)

 

16(4) Beaver County

 

17(i) Aliquippa and Ohio River Railroad

 

18(A) Rehabilitation, including ties, rail,
19surface, bridge, switches, ditching,
20undercutting, brush cutting, road
21crossings, signal and communication
22and related work

 

23Project Allocation

3,500,000

24(Base Project Allocation - $3,500,000)

 

25(B) Rail construction or rail
26rehabilitation for support of new or
27existing customers in Beaver County

 

28Project Allocation

7,000,000

29(Base Project Allocation - $7,000,000)

 

30(5) Berks County

 

1(i) City of Reading

 

2(A) Rehabilitation, construction and
3renovation of rail infrastructure to
4service Evergreen Community Power
5site, including track construction and
6rebuild, property and right-of-way
7acquisition, design, engineering,
8permitting, rails, ties, ballast,
9crossings, switches, turnouts, repair
10of grade crossings, track and other
11repairs and rebuilds, construction of
12rail service and any other related
13costs

 

14Project Allocation

5,000,000

15(Base Project Allocation - $5,000,000)

 

16(ii) Colebrookdale Railroad

 

<-17(A) Rehabilitation of historic Civil War
18Era railroad, including track
19improvements, siding extensions,
20passenger station development,
21equipment maintenance facility
22construction and related work

 

23Project Allocation

10,000,000

24(Base Project Allocation -
25$10,000,000)

 

<-26(A) Rehabilitation of railroad, including
27track improvements, siding extensions,
28visitors center, equipment and
29equipment maintenance facility,
30construction and related work to

 

1enhance economic development
2opportunities and enhance corridor for
3freight traffic in Berks and
4Montgomery Counties

 

5Project Allocation

10,000,000

6(Base Project Allocation -
7$10,000,000)

 

8(iii) Richmond Township

 

9(A) Construction of an approximately
103,000 feet, three-track rail spur from
11Norfolk Southern eastbound mainline
12between Reading and Allentown to East
13Penn Manufacturing facility, including
14track, ties, rail, switches, surface,
15bridges, road crossing, drainage,
16grading and other associated
17improvements and costs

 

18Project Allocation

921,000

19(Base Project Allocation - $921,000)

 

20(6) Bucks County

 

21(i) Fairless Hills

 

22(A) Acquisition, infrastructure,
23redevelopment, construction and other
24related costs for Fairless Hills rail
25expansion project at the Keystone
26Industrial Port complex

 

27Project Allocation

5,750,000

28(Base Project Allocation - $5,750,000)

 

<-29(ii) Falls Township

 

30(A) Acquisition, infrastructure, rail

 

1improvements and other related costs
2for development of industrial facility
3located at Keystone Industrial Port
4Complex

 

5Project Allocation

15,000,000

6(Base Project Allocation -
7$15,000,000)

 

<-8(ii) Bucks County Industrial Development
9Authority

 

<-10(iii) Bucks County Industrial Development
11Authority

 

12(A) Acquisition, infrastructure,
13redevelopment, construction and other
14related costs to extend rail service
15to Riverside Industrial Park

 

16Project Allocation

5,000,000

17(Base Project Allocation - $5,000,000)

 

<-18(iii) SMS Rail Lines

 

<-19(iv) SMS Rail Lines

 

20(A) Expand service to current and future
21customers and upgrade rail
22infrastructure, including land
23acquisition, engineering, site
24preparation, rail, ties, undercutting,
25ballast, sidings, crossings, equipment
26and other related materials

 

27Project Allocation

4,000,000

28(Base Project Allocation - $4,000,000)

 

29(7) Cambria County

 

30(i) City of Johnstown

 

1(A) Rehabilitation, construction and
2renovation of rail infrastructure to
3service an economic development
4project related to or impacted by
5Marcellus Shale natural gas production
6located in the greater Johnstown area,
7including track construction and
8rebuild, property and right-of-way
9acquisition, design, engineering,
10permitting, rails, ties, ballast,
11crossings, switches, turnouts, repair
12of grade crossings, track and other
13repairs and rebuilds, construction of
14rail station and any other related
15costs

 

16Project Allocation

10,000,000

17(Base Project Allocation -
18$10,000,000)

 

19(ii) County projects

 

20(A) Rehabilitation, construction and
21renovation of rail infrastructure to
22service an economic development
23project related to or impacted by
24Marcellus Shale natural gas
25production, located in the greater
26Johnstown area, including track
27construction and rebuild, property and
28right-of-way acquisition, design,
29engineering, permitting, rails, ties,
30ballast, crossings, switches,

 

1turnouts, repair of grade crossings,
2track and other repairs and rebuilds,
3construction of rail station and any
4other related costs

 

5Project Allocation

10,000,000

6(Base Project Allocation -
7$10,000,000)

 

<-8(B) Rehabilitation, construction and
9renovation of rail infrastructure to
10serve economic development project

 

11Project Allocation

10,000,000

12(Base Project Allocation -
13$10,000,000)

 

14(7.1) Carbon County

 

<-15(i) Graymont, Inc., Pleasant Gap

 

16(A) Rail construction and rehabilitation,
17including grading and filling,
18ballasts, switches, derailers and
19related work for a Graymont, Inc.,
20Pleasant Gap plant rail expansion
21project

 

22Project Allocation

2,100,000

23(Base Project Allocation - $2,100,000)

 

24(i)<- (ii) Reading Blue Mountain and Northern
25Railroad

 

26(A) Nesquehoning bridge project, Phase 2,
27construction of second span over
28Lehigh River adjacent to existing
29bridge

 

30Project Allocation

10,000,000

1(Base Project Allocation -
2$10,000,000)

 

<-3(7.2) Centre County

 

4(i) Titan Energy Park

 

5(A) Rail construction, rail sidings,
6switches, bridge replacement, site
7upgrades, connector road, loading
8equipment, building upgrades, access
9systems and other related costs for
10development of centralized
11transloading site

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

14(7.3) Chester County<-

 

15(i) Coatesville City

 

16(A) Rehabilitation of rail infrastructure
17pertaining to Modena Railroad Bridge
18to facilitate efficient and safe
19movement of raw materials and finished
20steel products, including, but not
21limited to, engineering, site
22preparation, drainage, grading, rails,
23ties, ballast, switches, crossings,
24sidings, bridge and paving

 

25Project Allocation

2,800,000

26(Base Project Allocation - $2,800,000)

 

27(7.4) Clearfield County

 

28(i) Bloom Township

 

29(A) Construction, infrastructure and
30other related costs for the

 

1development of a regional trans
2loading facility at the Falls Creek
3location of Russell Stone Products

 

4Project Allocation

1,400,000

5(Base Project Allocation - $1,400,000)

 

6(7.2) <-(7.3) Clinton County

 

7(7.5) Clinton County

<-

8(i) Clinton County Solid Waste Authority

 

9(A) Construction and related
10infrastructure for railroad siding and
11transloading facility in Wayne
12Township

 

13Project Allocation

1,000,000

14(Base Project Allocation - $1,000,000)

 

15(ii) Clinton County Economic Partnership

 

16(A) Construct siding and loading
17facilities for the <-Wayne Township 
18landfill Henry Street Rail project

 

19Project Allocation

1,000,000

20(Base Project Allocation - $1,000,000)

 

21(7.3) <-(7.4) Crawford County

 

<-22(7.6) Crawford County

 

23(i) Economic Progress Alliance of Crawford
24County

 

25(A) Infrastructure, construction and
26other related costs for development of
27Keystone Regional Industrial Park rail
28line, including improvements to
29existing rail line and construction of
30new track and turnouts

 

1Project Allocation

5,000,000

2(Base Project Allocation - $5,000,000)

 

3(7.4) <-(7.5) Dauphin County

 

<-4(7.7) Dauphin County

 

5(i) Steelton and Highspire Railroad

 

6(A) Rehabilitation of rail infrastructure
7to facilitate the efficient and safe
8movement of raw materials and finished
9steel products in Dauphin County,
10including engineering, site
11preparation, drainage, grading, rails,
12ties, ballast, switches, crossings,
13sidings, bridge and paving

 

14Project Allocation

8,000,000

15(Base Project Allocation - $8,000,000)

 

<-16(7.6) Delaware County

 

<-17(7.8) Delaware County

 

18(i) Delaware County Redevelopment Authority

 

19(A) Construction, acquisition, railroad
20infrastructure, including support
21facilities, and related costs for
22economic development project in
23Delaware County

 

24Project Allocation

10,000,000

25(Base Project Allocation -
26$10,000,000)

 

27(ii) SEPTA Media/Elwyn Regional Rail

 

28(A) Construction, infrastructure,
29redevelopment and other related costs
30for modernization of Secane Regional

 

1Rail Station

 

2Project Allocation

13,000,000

3(Base Project Allocation -
4$13,000,000)

 

5(8) Erie County

 

6(i) City of Erie

 

7(A) Construct rail improvements and ship
8loading infrastructure at the Port of
9Erie.

 

10Project Allocation

9,000,000

11(Base Project Allocation - $9,000,000)

 

12(B) Construct rail improvements and
13replace rail bridge at Erie Inland
14Port-Albion site.

 

15Project Allocation

12,000,000

16(Base Project Allocation -
17$12,000,000)

 

18(9) Fayette and Westmoreland Counties

 

19(i) Southwest Pennsylvania Railroad Company

 

20(A) Rehabilitate and build railroad
21infrastructure to enhance operational
22capacity, including acquisition of
23land, planning and engineering, rail,
24crossties, roadbed, drainage,
25interchanges, lubricators, sidings,
26public delivery tracks, bridges,
27crossings, freight yard modification
28and expansion

 

29Project Allocation

11,500,000

30(Base Project Allocation -

 

1$11,500,000)

 

2(10) Lackawanna County

 

3(i) Pocono Northeast Regional Railroad
4Authority

 

5(A) Purchase and install ties, ballast,
6raise, line and surface, bridge
7repairs, tunnel repairs, crossing
8rehabilitation and other related costs
9for Laurel Line Mainline project

 

10Project Allocation

1,500,000

11(Base Project Allocation - $1,500,000)

 

12(ii) Pennsylvania Northeast Regional Railroad
13Authority

 

14(A) Purchase and install ties, ballast,
15raise, line and surface, bridge
16repairs, tunnel repairs, crossing
17rehabilitation and other related costs
18for Carbondale Mainline

 

19Project Allocation

2,000,000

20(Base Project Allocation - $2,000,000)

 

21(B) Purchase and install ties, ballast,
22raise, line and surface, bridge
23repairs, tunnel repairs, crossing
24rehabilitation and other related costs
25for Pocono Mainline

 

26Project Allocation

1,250,000

27(Base Project Allocation - $1,250,000)

 

28(iii) County of Lackawanna Transit System

 

29(A) Acquisition, construction,
30infrastructure and other costs related

 

1to an intermodal transportation center

 

2Project Allocation

1,000,000

3(Base Project Allocation - $1,000,000)

 

4(11) Lancaster County

 

<-5(i) Columbia Economic Development Corporation

 

6(A) Construction, infrastructure,
7redevelopment and other related costs
8for railroad tracks, turnouts to serve
9as a rail yard, a runaround track,
10track repair and rehabilitation in
11Columbia Borough

 

12Project Allocation

733,000

13(Base Project Allocation - $733,000)

 

14(ii) Lancaster County Redevelopment Authority

 

15(A) Acquisition, construction,
16infrastructure and other related costs
17for rail relocation, including removal
18of old tracks, construction of new
19switching track and redevelopment of
20old track site in Lititz Borough

 

21Project Allocation

3,000,000

22(Base Project Allocation - $3,000,000)

 

23(i) <-(iii) Strasburg Railroad

 

24(A) Land acquisition, engineering, rail,
25ties, ballast, crossings, transload
26equipment and other related costs for
27expansion of existing transload
28terminal and rail infrastructure

 

29Project Allocation

4,000,000

30(Base Project Allocation - $4,000,000)

 

<-1(iv) Urban Outfitters, Inc.

 

2(A) Rehabilitation, construction and
3renovation of rail infrastructure to
4service a direct-to-consumer
5distribution center located in the Gap
6area of Lancaster County, including
7track construction and rebuild,
8property and right-of-way acquisition,
9design, engineering, permitting,
10rails, ties, ballasts, crossings,
11switches, turnouts, repair of grade
12crossings, track and other repairs and
13rebuilds, construction of rail station
14and any other related costs in
15Salisbury Township

 

16Project Allocation

10,000,000

17(Base Project Allocation -
18$10,000,000)

 

<-19(11.1) Luzerne County

 

20(i) County projects

 

21(A) Rehabilitate existing rail
22infrastructure and construct transload
23facility, including site preparation,
24engineering, grading, rail, ties,
25ballast, switch relocation, paving,
26gravel, fabrication of concrete pad,
27acquiring and installing truck scale
28and other materials necessary in the
29operation of the new facility

 

30Project Allocation

1,400,000

1(Base Project Allocation - $1,400,000)

 

2(B) Construction, site preparation,
3engineering, grading, rail ties,
4ballast, acquiring and installing rail
5scale and other related materials to
6extend siding to provide direct rail
7access to Northeast Recycling
8Solutions

 

9Project Allocation

2,000,000

10(Base Project Allocation - $2,000,000)

 

11(12) Lycoming County

 

12(i) Jersey Shore Railroad

 

13(A) Rehabilitation of existing yard rail
14infrastructure and construction of
15additional track to increase capacity
16within the yard, including
17engineering, site preparation, rail,
18ties, ballast and grade crossings

 

19Project Allocation

3,500,000

20(Base Project Allocation - $3,500,000)

 

21(ii) Williamsport City

 

22(A) Track rehabilitation, new 
23construction and other related costs 
24to provide rail service to NuWeld 
25Corporation facility

 

26Project Allocation

350,000

27(Base Project Allocation - $350,000)

 

28(13) McKean County

 

29(i) American Refining Group

 

30(A) Reconstruct loading areas and

 

1rehabilitate existing infrastructure
2in McKean County to facilitate safe
3and efficient transfer of products
4critical to oil refining and petroleum
5distribution supply chain, including
6engineering, site preparation, rail,
7ties, ballast, switches, sidings,
8crossings, drainage, pipe and related
9loading equipment

 

10Project Allocation

4,000,000

11(Base Project Allocation - $4,000,000)

 

12(ii) McKean County Economic Development

 

13(A) Acquisition, construction,
14rehabilitation, restoration,
15remediation, maintenance and
16infrastructure development and
17improvements for railroad development
18project

 

19Project Allocation

10,000,000

20(Base Project Allocation -
21$10,000,000)

 

<-22(13.1) Mercer County

 

23(i) Hempfield Township

 

24(A) Design, infrastructure, construction
25and other related costs for
26installation of new rail spur and rail
27siding at Hodge Foundry

 

28Project Allocation

700,000

29(Base Project Allocation - $700,000)

 

30(14) Mifflin County

 

1(i) Mifflin County Industrial Development
2Authority

 

3(A) Infrastructure, rehabilitation,
4abatement of hazardous materials and
5other related costs for remediation of
6abandoned brownfield site and
7construction of new railroad
8infrastructure

 

9Project Allocation

2,000,000

10(Base Project Allocation - $2,000,000)

 

11(15) Monroe County

 

12(i) Pennsylvania Northeast Regional Railroad
13Authority

 

14(A) Purchase and install ties, ballast,
15raise, line and surface, bridge
16repairs, tunnel repairs, crossing
17rehabilitation and other related costs
18for Pocono Mainline

 

19Project Allocation

2,500,000

20(Base Project Allocation - $2,500,000)

 

21(16) Montgomery County

 

22(i) Montgomery County

 

23(A) Construction, infrastructure
24improvements and other costs related
25to expansion of Ardmore Train Station
26transit and parking improvements
27project

 

28Project Allocation

10,000,000

29(Base Project Allocation -
30$10,000,000)

 

<-1(ii) Colebrookdale Railroad

 

2(A) Rehabilitation of railroad, including
3track improvements, siding extensions,
4visitors centers, equipment and
5equipment maintenance facility,
6construction and related work to
7enhance economic development
8opportunities and enhance corridor for
9freight traffic in Berks and
10Montgomery Counties

 

11Project Allocation

10,000,000

12(Base Project Allocation -
13$10,000,000)

 

<-14(iii) Pennsylvania Northeastern Railroad

 

15(A) Rehabilitation of railroad, including
16track improvements, resurfacing road
17crossings and related remedial work to
18enhance economic development
19opportunities and enhance corridor for
20freight traffic in Lansdale, Hatfield
21and Souderton

 

22Project Allocation

770,000

23(Base Project Allocation - $770,000)

 

24(16.1) Philadelphia

 

25(i) Philadelphia Regional Port Authority and
26PennDOT

 

27(A) General access and on-terminal rail
28improvements for port facilities

 

29Project Allocation

18,000,000

30(Base Project Allocation -

 

1$18,000,000)

 

2(ii) Philadelphia County

 

3(A) Port of Philadelphia Pier 122 bulk
4cargo terminal facility, new rail line
5and rail turnout construction, pier
6crane, materials and equipment

 

7Project Allocation

3,700,000

8(Base Project Allocation - $3,700,000)

 

9(17) Schuylkill County

 

10(i) Greater Tamaqua Industrial Development
11Enterprise

 

12(A) Infrastructure, rehabilitation and
13other related costs for Gordon
14Building rail spur project, including
15new rail and switches

 

16Project Allocation

140,000

17(Base Project Allocation - $140,000)

 

<-18(17.1) Somerset County

 

19(i) Somerset County

 

20(A) Construction, infrastructure and
21other related costs for rail projects
22relating to economic development
23projects in Quemahoning Township

 

24Project Allocation

2,000,000

25(Base Project Allocation - $2,000,000)

 

26(B) Acquisition, construction,
27infrastructure and other related costs
28for rail siding and transloading
29facility in Shade Township

 

30Project Allocation

2,100,000

1(Base Project Allocation - $2,100,000)

 

2(18) Washington County

 

3(i) Washington County

 

4(A) Acquisition, construction,
5infrastructure, redevelopment and
6other costs related to site
7improvement project at Mon River
8Industrial Park in Allenport Borough

 

9Project Allocation

10,000,000

10(Base Project Allocation -
11$10,000,000)

 

12(B) Acquisition, construction,
13infrastructure, redevelopment and
14other costs related to Zediker Station
15Business Park improvement project in
16South Strabane Township

 

17Project Allocation

10,000,000

18(Base Project Allocation -
19$10,000,000)

 

20(C) Acquisition, construction,
21infrastructure, redevelopment and
22other costs related to mixed-use
23business park

 

24Project Allocation

2,000,000

25(Base Project Allocation - $2,000,000)

 

26(D) Acquisition, construction,
27infrastructure, redevelopment and
28other costs related to development of
29pad-ready sites along the I-79 and
30Route 19 corridor

 

1Project Allocation

5,000,000

2(Base Project Allocation - $5,000,000)

 

3(E) Acquisition, construction,
4infrastructure, redevelopment and
5other costs related to locating sites
6for support companies for natural gas
7industry

 

8Project Allocation

3,000,000

9(Base Project Allocation - $3,000,000)

 

10(F) Acquisition, construction,
11infrastructure, redevelopment and
12other costs related to redevelopment
13of former industrial sites for new and
14expanding businesses

 

15Project Allocation

5,000,000

16(Base Project Allocation - $5,000,000)

 

17(G) Acquisition, construction,
18infrastructure, redevelopment and
19other costs related to Mon Valley
20receiving and loading facility
21development project

 

22Project Allocation

5,000,000

23(Base Project Allocation - $5,000,000)

 

24(H) Acquisition, construction,
25infrastructure, redevelopment and
26other costs related to development of
27sites adjacent to Washington County
28Airport for aviation-related business
29park

 

30Project Allocation

10,000,000

1(Base Project Allocation -
2$10,000,000)

 

3(I) Acquisition, construction,
4infrastructure, redevelopment and
5other costs related to Skypointe
6business park

 

7Project Allocation

5,000,000

8(Base Project Allocation - $5,000,000)

 

<-9(J) Acquisition, construction,
10infrastructure and other related costs
11for loadout facility in Carroll
12Township

 

13Project Allocation

4,750,000

14(Base Project Allocation - $4,750,000)

 

15(19) Westmoreland County

 

16(i) Three Rivers Marine and Rail Terminal LP

 

17(A) Infrastructure, rehabilitation,
18construction and other related costs
19for rail track expansion, including
20addition of rail switches

 

21Project Allocation

750,000

22(Base Project Allocation - $750,000)

 

23(ii) Westmoreland County Industrial
24Development Corporation

 

25(A) Infrastructure, construction and
26other related costs for Southwest
27Pennsylvania Railroad rail
28rehabilitation project

 

29Project Allocation

1,000,000

30(Base Project Allocation - $1,000,000)

 

1(B) Infrastructure, construction and
2other related costs for Derry
3Porcelain Park Redevelopment project,
4including extension of rail spur
5service for industrial use

 

6Project Allocation

350,000

7(Base Project Allocation - $350,000)

 

<-8(iii) Westmoreland County

 

9(A) Construction, infrastructure and
10other related costs for rail expansion
11project in City of Monessen

 

12Project Allocation

750,000

13(Base Project Allocation - $750,000)

 

14(20) Wyoming County

 

15(i) Procter and Gamble Paper Products Co.,
16Mehoopany Plant

 

17(A) Rehabilitate rail and existing
18infrastructure, including switches,
19signals, ties, ballast, rail, timbers,
20surfacing and other related materials

 

21Project Allocation

250,000

22(Base Project Allocation - $250,000)

 

23(21) Multiple Counties

 

24(i) D & I Silica, LLC

 

25(A) Improve and expand existing transload
26sites in Armstrong, Cameron, Elk,
27Fayette, Luzerne, McKean, Tioga and
28Warren Counties, including land
29acquisition, drainage, ditching, rail,
30ties, ballast, switches, grading,

 

1surfacing, gaging, unloading pits,
2transload equipment, truck staging and
3road access

 

4Project Allocation

5,500,000

5(Base Project Allocation - $5,500,000)

 

6(B) Establish new intermodal facilities
7to transload materials required by
8natural gas industry in Blair,
9Bradford, Butler, Centre, Clearfield,
10Clinton, Crawford, Erie, Indiana,
11Lawrence, Mercer, Venango,
12Westmoreland and Wyoming Counties,
13including land acquisition, site
14preparation, brush cutting, drainage,
15ditching, rail, ties, ballast,
16switches, grading, surfacing,
17unloading pits, transload equipment,
18truck staging and road access

 

19Project Allocation

10,000,000

20(Base Project Allocation -
21$10,000,000)

 

22(ii) SEDA-COG Joint Rail Authority

 

23(A) Railroad bridge upgrades, including
24load capacity increases in Columbia,
25Montour, Northumberland, Union,
26Lycoming, Clinton, Centre, Blair and
27Mifflin Counties

 

28Project Allocation

2,100,000

29(Base Project Allocation - $2,100,000)

 

30(B) Nittany & Bald Eagle Railroad yard

 

1upgrades and expansion, including
2construction of railroad tracks in
3Blair, Centre and Clinton Counties

 

4Project Allocation

2,800,000

5(Base Project Allocation - $2,800,000)

 

6(C) Shamokin City and yard
7rehabilitation, including roadbed,
8crossing surfaces, turnouts and
9related track work

 

10Project Allocation

3,150,000

11(Base Project Allocation - $3,150,000)

 

12(D) Lycoming Valley Railroad track
13upgrades and expansion, including
14construction of new storage tracks
15between Williamsport, Lycoming County,
16and South Avis, Clinton County

 

17Project Allocation

1,260,000

18(Base Project Allocation - $1,260,000)

 

19(E) Capital upgrades and other safety
20upgrades to eight railroad bridges in
21Blair, Centre, Columbia, Lycoming,
22Mifflin and Northumberland Counties
23for critical rail service on the
24Nittany & Bald Eagle, Juniata Valley,
25Lycoming Valley, North Shore and
26Shamokin Valley Railroads

 

27Project Allocation

3,500,000

28(Base Project Allocation - $3,500,000)

 

29(iii) North Shore Railroad

 

30(A) Retrofitting of diesel locomotives

 

1and other equipment to operate on
2alternative fuel sources or natural
3gas, or both, in Lycoming and
4Northumberland Counties

 

5Project Allocation

750,000

6(Base Project Allocation - $750,000)

 

7(B) Rehabilitation, infrastructure,
8construction and other related costs
9for equipment upgrades, installation
10of new technology and other upgrades
11to ensure Federal regulation
12compliance in Blair, Centre, Clinton,
13Columbia, Lycoming, Mifflin, Montour
14and Northumberland Counties

 

15Project Allocation

1,250,000

16(Base Project Allocation - $1,250,000)

 

17(iv) R. J. Corman Railroad Company

 

18(A) Rehabilitation of the rail line known
19as the Clearfield Cluster, located in
20Cambria, Centre, Clearfield, Clinton,
21Indiana and Jefferson Counties,
22including rail bed, ties, rail and
23other materials to support continued
24growth of business in these areas and
25reduction of truck traffic

 

26Project Allocation

20,000,000

27(Base Project Allocation -
28$20,000,000)

 

29(v) Southwest Pennsylvania Railroad

 

30(A) Rehabilitate and build railroad

 

1infrastructure to enhance operational
2capacity in Fayette and Westmoreland
3Counties, including acquisition of
4land, planning and engineering, rail,
5crossties, roadbed, drainage,
6interchanges, lubricators, sidings,
7public delivery tracks, bridges,
8crossings, freight yard modification
9and expansion

 

10Project Allocation

11,500,000

11(Base Project Allocation -
12$11,500,000)

 

<-13(vi) Colebrookdale Railroad

 

14(A) Rehabilitation of historic Civil War
15Era Railroad, including track
16improvements, siding extensions,
17passenger station development,
18equipment maintenance facility
19construction and related work, to
20develop heritage tourism economic
21opportunities and preserve corridor
22for future freight traffic in Berks
23and Montgomery Counties

 

24Project Allocation

4,000,000

25(Base Project Allocation - $4,000,000)

 

26(vii) <-(vi) Lycoming and Union Counties

 

27(A) Construction, rehabilitation,
28development of rail infrastructure and
29other costs relating to extending
30service through Gregg Township, Union

 

1County, to Timber Run Industrial Park
2in Brady Township, Lycoming County

 

3Project Allocation

7,000,000

4(Base Project Allocation - $7,000,000)

 

5(c) Air transportation.--Additional capital projects in the
6category of transportation assistance projects for air
7transportation service to which an interest is to be acquired by
8the Department of Transportation, its successors or assigns and
9to be financed by the incurring of debt are hereby itemized,
10together with their respective estimated financial costs, as
11follows:

12 

13Project

Total Project

Allocation

14(1) Allegheny County

 

15(i) Allegheny County Airport Authority

 

16(A) Acquisition, construction,
17infrastructure and other related costs
18for aviation, industrial and
19commercial site development and
20improvements at or surrounding
21Allegheny County Airport

 

22Project Allocation

20,000,000

23(Base Project Allocation -
24$20,000,000)

 

25(B) Construction, infrastructure
26improvements and other costs related
27to development of de-icing fluid
28treatment facility at Pittsburgh
29International Airport

 

30Project Allocation

12,500,000

1(Base Project Allocation -
2$12,500,000)

 

3(C) Construction, infrastructure
4improvements and other costs related
5to development of Phase III of Clinton
6Commerce Center

 

7Project Allocation

15,000,000

8(Base Project Allocation -
9$15,000,000)

 

10(D) Construction, infrastructure
11improvements and other costs related
12to development of business park on
13site 7 at Pittsburgh International
14Airport

 

15Project Allocation

7,000,000

16(Base Project Allocation - $7,000,000)

 

17(E) Construction, infrastructure
18improvements and other costs related
19to development of Cherrington Commerce
20Center Phase II

 

21Project Allocation

10,000,000

22(Base Project Allocation -
23$10,000,000)

 

24(F) Acquisition, construction,
25infrastructure and other related costs
26for development of industrial and
27commercial sites at or surrounding
28Pittsburgh International Airport

 

29Project Allocation

50,000,000

30(Base Project Allocation -

 

1$50,000,000)

 

2(2) Armstrong County

 

3(i) McVille Airport

 

4(A) Acquisition, infrastructure,
5construction and other related costs
6for expansion of existing facilities
7and construction of access road, new
8hangars and helipad

 

9Project Allocation

1,500,000

10(Base Project Allocation - $1,500,000)

 

<-11(2.1) Beaver County

 

12(i) Beaver County Airport Authority

 

13(A) Construction and other related costs
14for hangars and an extension of runway
15in Chippewa Township

 

16Project Allocation

300,000

17(Base Project Allocation - $300,000)

 

18(2.2) Bedford County

 

19(i) Bedford County Airport Authority

 

<-20(A) Construction and other related costs
21for a hangar and required taxi lane

 

22Project Allocation

1,000,000

23(Base Project Allocation - $1,000,000)

 

<-24(A) Acquisition, construction and other
25related costs for airport expansion of
26hangars, required taxi lane, removal
27of landing approach obstructions,
28operation and maintenance buildings,
29required infrastructure, including
30roads and parking, for both aircraft

 

1and automobiles

 

2Project Allocation

10,000,000

3(Base Project Allocation -
4$10,000,000)

 

5(2.3) Bradford County

 

6(i) Bradford County Airport Authority

 

7(A) Construction and other related costs
8to extend runway and parallel taxiway
9in Towanda

 

10Project Allocation

4,227,000

11(Base Project Allocation - $4,227,000)

 

12(3) Bucks County

 

13(i) Bucks County Airport Authority

 

14(A) Infrastructure, construction and
15other related costs for airport
16improvements and upgrades at
17Quakertown Airport, including
18renovations to existing facilities and
19paving of parking lot and access roads

 

20Project Allocation

150,000

21(Base Project Allocation - $150,000)

 

22(B) Infrastructure, construction and
23other related costs for airport
24improvements and upgrades at
25Doylestown Airport, including
26demolition, infrastructure development
27and construction of administration
28building, aircraft storage hangar and
29aircraft maintenance hangar

 

30Project Allocation

1,500,000

1(Base Project Allocation - $1,500,000)

 

2(4) Carbon County

 

3(i) Carbon County Airport Authority

 

4(A) Construction of airport buildings,
5including general aviation terminal
6and snow removal equipment storage and
7aircraft storage hangars

 

8Project Allocation

4,500,000

9(Base Project Allocation - $4,500,000)

 

10(5) Chester County

 

11(i) Chester County Area Airport Authority

 

12(A) Infrastructure, construction and
13other related costs for Phase I of a
14hangar development expansion project

 

15Project Allocation

337,000

16(Base Project Allocation - $337,000)

 

17(6) Crawford County

 

18(i) Crawford County Regional Airport
19Authority

 

20(A) Design, engineer and other related
21costs for the construction of field
22hangar

 

23Project Allocation

1,500,000

24(Base Project Allocation - $1,500,000)

 

25(B) Design, engineer, and other related
26costs for construction of aircraft T
27hangars

 

28Project Allocation

1,000,000

29(Base Project Allocation - $1,000,000)

 

30(ii) Titusville Airport Authority

 

1(A) Runway expansion

 

2Project Allocation

1,000,000

3(Base Project Allocation - $1,000,000)

 

4(7) Lancaster County

 

5(i) Lancaster Airport Authority

 

6(A) Site development to include sewer
7pumping station and extended sewer
8lines

 

9Project Allocation

750,000

10(Base Project Allocation - $750,000)

 

<-11(8) Luzerne County

 

12(i) Hazleton Airport

 

13(A) Acquisition, construction,
14rehabilitation and other related costs
15for hangars and expansion of runway at
16Hazleton Airport

 

17Project Allocation

300,000

18(Base Project Allocation - $300,000)

 

<-19(8) (9) Lycoming County

 

20(i) Williamsport Regional Airport

 

21(A) Design and construction of facility
22improvements, including directional
23signage, terminal building,
24renovations and parking

 

25Project Allocation

3,676,000

26(Base Project Allocation - $3,676,000)

 

27(B) Demolition of existing terminal
28building and other associated
29buildings, construction of new
30terminal building and other airport

 

1improvements

 

2Project Allocation

11,500,000

3(Base Project Allocation -
4$11,500,000)

 

<-5(9) (10) Somerset County

 

6(i) Somerset County Airport

 

7(A) Replacement of existing underground
8aviation fuel storage tanks and
9dispensing units

 

10Project Allocation

400,000

11(Base Project Allocation - $400,000)

 

12(B) Construction of permanent location
13for medical helicopter base

 

14Project Allocation

400,000

15(Base Project Allocation - $400,000)

 

16(C) Construction of new hangars,
17improvements to existing hangars and
18acquisition of existing hangars

 

19Project Allocation

500,000

20(Base Project Allocation - $500,000)

 

<-21(10) (11) Snyder County

 

22(i) Penn Valley Airport Authority

 

23(A) Acquisition, infrastructure and other
24related costs for development of
25aviation industrial park

 

26Project Allocation

750,000

27(Base Project Allocation - $750,000)

 

28(B) Infrastructure, construction and
29other related costs for construction
30of energy-efficient maintenance

 

1facility

 

2Project Allocation

850,000

3(Base Project Allocation - $850,000)

 

<-4(11) (12) Washington County

 

5(i) Washington County Airport

 

6(A) Acquisition, construction,
7infrastructure, redevelopment and
8other costs related to development of
9sites adjacent to Washington County
10Airport for aviation-related business
11park

 

12Project Allocation

10,000,000

13(Base Project Allocation -
14$10,000,000)

 

15(ii) Skypointe Business Park

 

16(A) Acquisition, construction,
17infrastructure, redevelopment and
18other costs related to Skypointe
19business park

 

20Project Allocation

5,000,000

21(Base Project Allocation - $5,000,000)

 

22Section 6. Itemization of redevelopment assistance projects.

23(a) Additional capital projects in the category of
24redevelopment assistance projects for capital grants by the
25Department of Community and Economic Development, its successors
26or assigns, authorized under the provisions of the act of May
2720, 1949 (P.L.1633, No.493), known as the Housing and
28Redevelopment Assistance Law, and redevelopment assistance
29capital projects and to be financed by the incurring of debt,
30are hereby itemized, together with their estimated financial

1costs, as follows:

2 

3Project

Total Project

Allocation

4(1) Adams County

 

5(i) County projects

 

6(A) Design, infrastructure, construction
7and other related costs for the
8development of county-wide broadband
9infrastructure

 

10Project Allocation

5,000,000

11(Base Project Allocation - $5,000,000)

 

12(ii) Adams County Industrial Development
13Authority

 

14(A) Costs related to site preparations
15for lots within business park,
16including the blasting of diabase

 

17Project Allocation

500,000

18(Base Project Allocation - $500,000)

 

19(iii) Adams County Economic Development
20Corporation

 

21(A) Acquisition, construction and other
22related costs for new Head Start
23facility to provide educational and
24dental services to the community

 

25Project Allocation

1,000,000

26(Base Project Allocation - $1,000,000)

 

27(B) Rehabilitation, construction and
28other related costs for facilities
29expansion within professional center
30located in Cumberland Township

 

1Project Allocation

1,000,000

2(Base Project Allocation - $1,000,000)

 

3(C) Construction, infrastructure,
4acquisition and related development
5costs for commercial economic
6development project

 

7Project Allocation

5,000,000

8(Base Project Allocation - $5,000,000)

 

9(2) Allegheny County

 

10(i) County projects

 

11(A) Design, acquisition, infrastructure,
12construction and other related costs
13for redevelopment of Kelman Bottles
14plant, including equipment and system
15upgrades

 

16Project Allocation

2,500,000

17(Base Project Allocation - $2,500,000)

 

18(B) Acquisition, construction,
19infrastructure and other related costs
20for development of industrial and
21commercial sites at or surrounding
22Pittsburgh International Airport

 

23Project Allocation

50,000,000

24(Base Project Allocation -
25$50,000,000)

 

26(C) Infrastructure, site development and
27construction of The Odeon Building
28mixed use facility

 

29Project Allocation

2,000,000

30(Base Project Allocation - $2,000,000)

 

1(D) Acquisition, construction,
2infrastructure improvements and
3related costs for the development of
4an educational complex for Junior
5Achievement of Western Pennsylvania

 

6Project Allocation

5,500,000

7(Base Project Allocation - $5,500,000)

 

8(E) Site development, infrastructure,
9remediation and construction for
10Keystone Commons expansion project

 

11Project Allocation

10,000,000

12(Base Project Allocation -
13$10,000,000)

 

14(ii) City of Clairton

 

15(A) Acquisition, construction,
16infrastructure and other related costs
17for Clairton revitalization project

 

18Project Allocation

1,500,000

19(Base Project Allocation - $1,500,000)

 

<-20(B) Acquisition, construction,
21infrastructure, redevelopment,
22abatement of hazardous materials and
23other related costs for a citywide
24redevelopment project in City of
25Clairton

 

<-26Project Allocation

7,500,000

27(Base Project Allocation - $7,500,000)

 

<-28Project Allocation

750,000

29(Base Project Allocation - $750,000)

 

30(ii.1) City of McKeesport

 

1(A) Acquisition, construction,
2infrastructure, redevelopment,
3abatement of hazardous materials and
4other related costs for citywide
5redevelopment project in City of
6McKeesport

 

7Project Allocation

500,000

8(Base Project Allocation - $500,000)

 

9(iii) City of Pittsburgh

 

10(A) Construction, infrastructure
11improvements and other costs related
12to expansion of Women's Center and
13Shelter of Greater Pittsburgh

 

14Project Allocation

1,500,000

15(Base Project Allocation - $1,500,000)

 

16(B) Construction, infrastructure
17improvements and other costs related
18to mixed-use development of Eastside
19Campus of Chatham University

 

20Project Allocation

20,000,000

21(Base Project Allocation -
22$20,000,000)

 

23(C) Construction, infrastructure
24improvements and other costs related
25to office expansion building for The
26Andy Warhol Museum and Carnegie
27Museums of Pittsburgh

 

28Project Allocation

3,450,000

29(Base Project Allocation - $3,450,000)

 

30(D) Construction, infrastructure

 

1improvements and other costs related
2to Carnegie Science Center expansion
3project

 

4Project Allocation

15,000,000

5(Base Project Allocation -
6$15,000,000)

 

7(E) Acquisition, construction,
8infrastructure and other related costs
9for public park expansion project

 

10Project Allocation

5,000,000

11(Base Project Allocation - $5,000,000)

 

12(F) Acquisition, construction,
13infrastructure and other related costs
14for Pittsburgh Riverfront
15redevelopment projects

 

16Project Allocation

14,000,000

17(Base Project Allocation -
18$14,000,000)

 

19(G) Acquisition, construction,
20infrastructure and other related costs
21for Pittsburgh Advanced Technology
22Incubator development projects

 

23Project Allocation

10,000,000

24(Base Project Allocation -
25$10,000,000)

 

26(H) Acquisition, construction,
27infrastructure and other related costs
28for North Point Breeze redevelopment

 

29Project Allocation

1,000,000

30(Base Project Allocation - $1,000,000)

 

1(I) Acquisition, construction,
2infrastructure and other related costs
3for Larimer redevelopment neighborhood
4improvement project

 

5Project Allocation

5,000,000

6(Base Project Allocation - $5,000,000)

 

7(J) Acquisition, construction,
8infrastructure and other related costs
9for Homewood redevelopment mixed-use
10rehabilitation project

 

11Project Allocation

2,000,000

12(Base Project Allocation - $2,000,000)

 

13(K) Construction, infrastructure
14improvements and other related costs
15for Garfield redevelopment project

 

16Project Allocation

1,000,000

17(Base Project Allocation - $1,000,000)

 

18(L) Acquisition, construction,
19infrastructure and other related costs
20for Entrepreneur Resource Center
21project

 

22Project Allocation

6,000,000

23(Base Project Allocation - $6,000,000)

 

24(M) Acquisition, construction,
25infrastructure and other related costs
26for East Liberty redevelopment project

 

27Project Allocation

15,000,000

28(Base Project Allocation -
29$15,000,000)

 

30(N) Acquisition, construction,

 

1infrastructure and other related costs
2for Construction Junction project

 

3Project Allocation

4,000,000

4(Base Project Allocation - $4,000,000)

 

5(O) Acquisition, construction,
6infrastructure and other related costs
7for redevelopment of closed schools
8and historic churches into housing,
9office or commercial uses

 

10Project Allocation

2,000,000

11(Base Project Allocation - $2,000,000)

 

12(P) Demolition, acquisition,
13construction, infrastructure and other
14related costs for redevelopment of
15areas in Central Lawrenceville

 

16Project Allocation

5,500,000

17(Base Project Allocation - $5,500,000)

 

18(Q) Acquisition, construction,
19infrastructure and other related costs
20for Allegheny Riverfront redevelopment
21project

 

22Project Allocation

14,000,000

23(Base Project Allocation -
24$14,000,000)

 

25(R) Acquisition, construction,
26infrastructure and other related costs
27for Hill District Uptown redevelopment
28project

 

29Project Allocation

2,000,000

30(Base Project Allocation - $2,000,000)

 

1(S) Acquisition, construction,
2infrastructure and other related costs
3for Pittsburgh Neighborhood
4Connectivity project

 

5Project Allocation

200,000,000

6(Base Project Allocation -
7$200,000,000)

 

8(T) Acquisition, construction,
9infrastructure and other related costs
10for transit-oriented development
11projects

 

12Project Allocation

20,000,000

13(Base Project Allocation -
14$20,000,000)

 

15(U) Acquisition, construction,
16infrastructure and other related costs
17for Flashlight Factory Loft project

 

18Project Allocation

1,500,000

19(Base Project Allocation - $1,500,000)

 

20(V) Acquisition, construction,
21infrastructure and other related costs
22for Duquesne University renovation
23project

 

<-24Project Allocation

10,000,000

25(Base Project Allocation -
26$10,000,000)

 

<-27Project Allocation

20,000,000

28(Base Project Allocation -
29$20,000,000)

 

30(W) Acquisition, construction,

 

1infrastructure and other related costs
2for University of Pittsburgh Medical
3Center Mercy projects

 

4Project Allocation

6,000,000

5(Base Project Allocation - $6,000,000)

 

6(X) Acquisition, construction,
7infrastructure and other related costs
8for University of Pittsburgh Medical
9Center Magee-Women's Hospital service
10line expansion project

 

11Project Allocation

6,000,000

12(Base Project Allocation - $6,000,000)

 

13(Y) Construction, infrastructure and
14other related costs for Pittsburgh
15Symphony Orchestra Heinz Hall
16renovation project

 

17Project Allocation

10,000,000

18(Base Project Allocation -
19$10,000,000)

 

20(Z) Construction, infrastructure and
21other related costs for Gardens at
22Market Square mixed-use development
23project

 

24Project Allocation

8,000,000

25(Base Project Allocation - $8,000,000)

 

26(AA) Acquisition, construction,
27infrastructure and other related costs
28for redevelopment of West
29Neighborhoods and Sheraden Market

 

30Project Allocation

7,000,000

1(Base Project Allocation - $7,000,000)

 

2(BB) Acquisition, construction,
3infrastructure and other related costs
4for Pittsburgh Civic Building Office
5relocation reinvestment project

 

6Project Allocation

10,000,000

7(Base Project Allocation -
8$10,000,000)

 

9(CC) Construction, infrastructure and
10other related costs for Pittsburgh
11Central Business District parking
12project

 

13Project Allocation

20,000,000

14(Base Project Allocation -
15$20,000,000)

 

16(DD) Acquisition, construction,
17infrastructure and other related costs
18for Parkway Center Mall redevelopment
19project

 

20Project Allocation

10,000,000

21(Base Project Allocation -
22$10,000,000)

 

23(EE) Demolition, acquisition,
24construction, infrastructure and
25related costs for the redevelopment of
26mixed-use development site in the
27neighborhood of Mount Washington

 

28Project Allocation

10,000,000

29(Base Project Allocation -
30$10,000,000)

 

1(FF) Construction, infrastructure and
2other related costs for Federal and
3North phase 2 project

 

4Project Allocation

2,000,000

5(Base Project Allocation - $2,000,000)

 

6(GG) Construction, infrastructure and
7other related costs for Downtown
8Pittsburgh revitalization project

 

9Project Allocation

20,000,000

10(Base Project Allocation -
11$20,000,000)

 

12(HH) Construction, infrastructure and
13other related costs for Downtown
14Preservation project phase 2

 

15Project Allocation

4,000,000

16(Base Project Allocation - $4,000,000)

 

17(II) Acquisition, construction,
18infrastructure and other related costs
19for redevelopment of former J. Allen
20Steel site in the Chateau neighborhood
21and in the adjacent Manchester
22neighborhood

 

23Project Allocation

18,000,000

24(Base Project Allocation -
25$18,000,000)

 

26(JJ) Construction, infrastructure and
27other related costs for Broadhead
28Industrial Park redevelopment project

 

29Project Allocation

10,000,000

30(Base Project Allocation -

 

1$10,000,000)

 

2(KK) Demolition, construction,
3restoration and related costs for
4commercial corridor in Beechview
5neighborhood

 

6Project Allocation

5,000,000

7(Base Project Allocation - $5,000,000)

 

8(LL) Construction, infrastructure and
9other related costs for Robert Morris
10University Student Recreation Center
11redevelopment project

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

14(MM) Renovations, infrastructure,
15rehabilitation and other related costs
16for Robert Morris University Yorktown
17Hall

 

18Project Allocation

1,000,000

19(Base Project Allocation - $1,000,000)

 

20(NN) Acquisition, remediation,
21infrastructure development and related
22site preparation costs for
23redevelopment of former brownfield
24site in Squirrel Hill and Swisshelm
25Park neighborhoods

 

26Project Allocation

5,000,000

27(Base Project Allocation - $5,000,000)

 

28(OO) Acquisition, site preparation of
29parking garages and related
30infrastructure within the

 

1redevelopment sites of South Side
2Works and Pittsburgh Technology Center

 

3Project Allocation

15,000,000

4(Base Project Allocation -
5$15,000,000)

 

6(PP) Acquisition, remediation,
7construction, infrastructure and
8related site preparation costs in
9Hazelwood neighborhood

 

10Project Allocation

20,000,000

11(Base Project Allocation -
12$20,000,000)

 

13(QQ) Acquisition, construction,
14renovation, infrastructure and related
15activities in redevelopment of
16neighborhood of Carrick

 

17Project Allocation

5,500,000

18(Base Project Allocation - $5,500,000)

 

19(RR) Acquisition, remediation,
20construction, infrastructure and
21related activities for redevelopment
22of strategic brownfield sites

 

23Project Allocation

15,000,000

24(Base Project Allocation -
25$15,000,000)

 

26(SS) Construction, infrastructure and
27other related costs for Gateway Center
28Islands refurbishment redevelopment
29project

 

30Project Allocation

1,000,000

1(Base Project Allocation - $1,000,000)

 

2(TT) Acquisition, infrastructure
3improvements, construction and other
4related costs for the University of
5Pittsburgh Medical Center's
6development of a Center for Innovation
7Science's Center for Personalized
8Medicine

 

9Project Allocation

10,000,000

10(Base Project Allocation -
11$10,000,000)

 

12(UU) Construction, renovations,
13infrastructure improvements and other
14related costs for the Northside
15Leadership Conference, Inc., Penn
16Brewery Expansion project

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(VV) Construction, renovations,
20infrastructure improvements and other
21related costs for the Northside
22Leadership Conference, Inc., East
23Deutschtown Historic Gateway mixed use
24project

 

25Project Allocation

2,000,000

26(Base Project Allocation - $2,000,000)

 

27(WW) Acquisition, construction,
28renovation, site work and
29infrastructure improvements for an
30office building and new hotel within

 

1the Oliver Building

 

2Project Allocation

20,000,000

3(Base Project Allocation -
4$20,000,000)

 

5(XX) Acquisition, construction and
6rehabilitation costs associated with
7converting the Wholey Building into
8residential units

 

9Project Allocation

17,000,000

10(Base Project Allocation -
11$17,000,000)

 

12(YY) Construction, infrastructure site
13development, remediation and other
14costs related to the Lawrenceville
15Technology Center project

 

16Project Allocation

5,000,000

17(Base Project Allocation - $5,000,000)

 

<-18(ZZ) Purchase, renovation and other
19related costs for community homes by
20Keystone Human Services to support
21persons with intellectual disabilities
22at University of Pittsburgh

 

23Project Allocation

50,000,000

24(Base Project Allocation -
25$50,000,000)

 

<-26(ZZ) Construction and other related costs
27for Innovation and Entrepreneurship
28Center

 

29Project Allocation

50,000,000

30(Base Project Allocation -

 

1$50,000,000)

 

2(AAA) Acquisition, construction,
3redevelopment and other related costs
4for Odeon Building

 

5Project Allocation

3,000,000

6(Base Project Allocation - $3,000,000)

 

7(BBB) Acquisition, construction,
8infrastructure, redevelopment,
9abatement of hazardous materials and
10other related costs for animal
11resource center

 

12Project Allocation

6,500,000

13(Base Project Allocation - $6,500,000)

 

14(CCC) Construction, infrastructure,
15redevelopment and other related costs
16for 31st Street Studios project

 

17Project Allocation

2,500,000

18(Base Project Allocation - $2,500,000)

 

19(DDD) Construction, redevelopment,
20abatement of hazardous materials and
21other related costs for advanced
22digital media design, fabrication and
23simulation center at Carnegie Mellon
24University

 

25Project Allocation

2,000,000

26(Base Project Allocation - $2,000,000)

 

27(EEE) Acquisition, construction,
28infrastructure, redevelopment and
29other related costs for animal
30resource center project

 

1Project Allocation

6,500,000

2(Base Project Allocation - $6,500,000)

 

3(FFF) Construction, redevelopment and
4other related costs for projects at
5site of former Carnegie Library
6Allegheny

 

7Project Allocation

1,625,000

8(Base Project Allocation - $1,625,000)

 

9(GGG) Construction, infrastructure,
10redevelopment and other related costs
11for projects at Frick Art and
12Historical Center

 

13Project Allocation

7,500,000

14(Base Project Allocation - $7,500,000)

 

15(HHH) Construction, infrastructure,
16redevelopment, rehabilitation and
17other related costs for Frick Art and
18Historical Center projects

 

19Project Allocation

7,500,000

20(Base Project Allocation - $7,500,000)

 

21(III) Acquisition, construction and other
22related costs for workforce
23development centers in City of
24Pittsburgh

 

25Project Allocation

4,000,000

26(Base Project Allocation - $4,000,000)

 

27(JJJ) Acquisition, construction,
28infrastructure and other related costs
29for National Museum of Broadcasting

 

30Project Allocation

1,500,000

1(Base Project Allocation - $1,500,000)

 

2(KKK) Acquisition, construction,
3infrastructure, redevelopment and
4other related costs for Parkway Center
5Mall

 

6Project Allocation

50,000,000

7(Base Project Allocation -
8$50,000,000)

 

9(LLL) Construction, redevelopment and
10other related costs for Pittsburgh
11Ballet Theatre expansion project

 

12Project Allocation

1,750,000

13(Base Project Allocation - $1,750,000)

 

14(MMM) Acquisition, construction,
15redevelopment and other related costs
16for project at Senator John Heinz
17History Center

 

18Project Allocation

2,000,000

19(Base Project Allocation - $2,000,000)

 

20(NNN) Acquisition, construction,
21infrastructure, redevelopment and
22other related costs for mixed-use
23development project

 

24Project Allocation

8,000,000

25(Base Project Allocation - $8,000,000)

 

26(OOO) Acquisition, construction,
27redevelopment, abatement of hazardous
28materials and other related costs for
29development project near intersection
30of Murray Avenue and Forward Avenue

 

1Project Allocation

4,500,000

2(Base Project Allocation - $4,500,000)

 

3(PPP) Acquisition, construction,
4infrastructure, redevelopment and
5other related costs for multimodal
6public transportation facility

 

7Project Allocation

5,000,000

8(Base Project Allocation - $5,000,000)

 

<-9(QQQ) Acquisition, construction,
10infrastructure, redevelopment and
11other related costs for development of
12Schenley Technology Park

 

13Project Allocation

20,000,000

14(Base Project Allocation -
15$20,000,000)

 

16(RRR) Acquisition, construction,
17infrastructure, redevelopment and
18other related costs for expansion and
19redevelopment of commercial and office
20space, including, but not limited to,
21PPG Place

 

22Project Allocation

20,000,000

23(Base Project Allocation -
24$20,000,000)

 

25(SSS) Acquisition, construction,
26infrastructure, redevelopment,
27abatement of hazardous materials and
28other related costs for projects
29relating to Town Place, including
30expansion of parking structure

 

1Project Allocation

10,000,000

2(Base Project Allocation -
3$10,000,000)

 

4(TTT) Acquisition, clearing, demolition,
5renovation, expansion, environmental
6remediation, construction,
7infrastructure, streets, utilities and
8other costs associated with the
9Addison development project located
10near Centre Avenue, Kirkpatrick
11Street, Bentley Drive and Devilliers
12Street

 

13Project Allocation

5,000,000

14(Base Project Allocation - $5,000,000)

 

15(UUU) Acquisition, clearing, demolition,
16renovation, expansion, environmental
17remediation, construction,
18infrastructure, streets, utilities,
19storm water mitigation and other costs
20associated with Larimer development
21project located near Negley Run,
22Washington and East Liberty
23Boulevards, Larimer and Lincoln
24Avenues and Broad Street

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(VVV) Acquisition, construction,
28infrastructure, redevelopment,
29abatement of hazardous waste and other
30related costs for Forbes Hotel project

 

1Project Allocation

10,000,000

2(Base Project Allocation -
3$10,000,000)

 

<-4(WWW) Construction, infrastructure,
5redevelopment and other related costs
6for renovation of City Theatre

 

7Project Allocation

3,000,000

8(Base Project Allocation - $3,000,000)

 

9(iii.1) Redevelopment Authority of Allegheny
10County

 

11(A) Acquisition, construction,
12infrastructure, redevelopment and
13other related costs for Chevron
14Appalachian Michigan Business Unit to
15locate its regional headquarters in
16Moon Township

 

17Project Allocation

8,533,000

18(Base Project Allocation - $8,533,000)

 

19(B) Construction, infrastructure,
20redevelopment and other related costs
21for Innovation Ridge technology and
22office park in Marshall Township

 

23Project Allocation

10,000,000

24(Base Project Allocation -
25$10,000,000)

 

26(iii.2) Allegheny County Housing Authority

 

27(A) Acquisition, infrastructure,
28construction and other related costs
29for development of Orchard Park -
30Phase I

 

1Project Allocation

750,000

2(Base Project Allocation - $750,000)

 

3(iv) Urban Redevelopment Authority of
4Pittsburgh

 

5(A) Acquisition, redevelopment and
6construction of property to support
7mixed-use development, parking garage
8and other infrastructure in Strip
9District

 

10Project Allocation

10,000,000

11(Base Project Allocation -
12$10,000,000)

 

<-13(iv.1) Aspinwall Borough

 

14(A) Construction, infrastructure,
15redevelopment and other related costs
16for Aspinwall Riverfront Park project

 

17Project Allocation

1,543,000

18(Base Project Allocation - $1,543,000)

 

19(iv.2) Bethel Park Municipality

 

20(A) Construction, infrastructure,
21redevelopment, renovation and other
22related costs for upgrades to Village
23Green Park

 

24Project Allocation

500,000

25(Base Project Allocation - $500,000)

 

26(B) Construction, acquisition, abatement
27of hazardous materials, redevelopment,
28renovation and other related costs for
29upgrades to Bethel Park VFD stations

 

30Project Allocation

500,000

1(Base Project Allocation - $500,000)

 

2(iv.3) Brentwood Borough

 

3(A) Construction, redevelopment and other
4related costs for Brentwood Municipal
5Public Safety Center

 

6Project Allocation

3,000,000

7(Base Project Allocation - $3,000,000)

 

8(B) Construction, redevelopment and other
9related costs for Brentwood Municipal
10Stadium

 

11Project Allocation

1,000,000

12(Base Project Allocation - $1,000,000)

 

13(v) Bridgeville Borough

 

14(A) Construction, infrastructure and
15other related costs for ACHIEVA's
16manufacturing facility expansion
17project

 

18Project Allocation

2,000,000

19(Base Project Allocation - $2,000,000)

 

<-20(v.1) Castle Shannon Borough

 

21(A) Construction, acquisition,
22infrastructure<-, redevelopment and
23other related costs for Waverly
24Terrace housing project

 

25Project Allocation

12,000,000

26(Base Project Allocation -
27$12,000,000)

 

28(v.2) Crafton Borough

 

29(A) Construction, infrastructure,
30redevelopment and other related costs

 

1for Crafton Park rehabilitation
2project

 

3Project Allocation

1,205,000

4(Base Project Allocation - $1,205,000)

 

5(v.1) <-(v.3) Edgewood Borough

 

6(A) Construction, infrastructure
7improvements and related costs for a
8new residence hall at the Western
9Pennsylvania School for the Deaf

 

10Project Allocation

3,000,000

11(Base Project Allocation - $3,000,000)

 

<-12(v.4) Etna Borough

 

13(A) Construction and other related costs
14for municipal complex improvements

 

15Project Allocation

1,000,000

16(Base Project Allocation - $1,000,000)

 

17(vi) Findlay Township

 

18(A) Construction, infrastructure
19improvements and other costs related
20to development of de-icing fluid
21treatment facility at Pittsburgh
22International Airport

 

23Project Allocation

12,500,000

24(Base Project Allocation -
25$12,500,000)

 

26(B) Construction, infrastructure
27improvements and other costs related
28to development of Phase III of Clinton
29Commerce Center

 

30Project Allocation

15,000,000

1(Base Project Allocation -
2$15,000,000)

 

<-3(C) Construction, acquisition,
4infrastructure and other related costs
5for development project

 

6Project Allocation

20,000,000

7(Base Project Allocation -
8$20,000,000)

 

9(vi.1) Glenshaw

 

10(A) Construction, acquisition,
11infrastructure and related costs for 
12the TAKTL facility

 

13Project Allocation

20,000,000

14(Base Project Allocation -
15$20,000,000)

 

16(vi.2) Greentree Borough

 

17(A) Acquisition, construction,
18infrastructure, redevelopment and
19other related costs for Parkway Center
20Mall

 

21Project Allocation

10,000,000

22(Base Project Allocation -
23$10,000,000)

 

24(vi.3) Harmar Township

 

25(A) Construction, infrastructure,
26redevelopment and other related costs
27for improvements to and expansion of
28PPG facility

 

29Project Allocation

10,000,000

30(Base Project Allocation -

 

1$10,000,000)

 

2(vii) McKees Rocks Borough

 

3(A) Construction, infrastructure and
4other related costs for Ohio Valley
5General Hospital Data and Information
6Technology Center

 

7Project Allocation

2,000,000

8(Base Project Allocation - $2,000,000)

 

9(B) Construction, acquisition,
10infrastructure and related costs for
11the Island Studios Expansion Project
12to include, but not be limited to, a
13film studio, hotel, museum, office and
14other development

 

15Project Allocation

10,000,000

16(Base Project Allocation -
17$10,000,000)

 

<-18(vii.1) Millvale Borough

 

19(A) Acquisition, infrastructure,
20redevelopment, abatement of hazardous
21materials and other related costs, for
22improvements in central business
23district

 

24Project Allocation

1,000,000

25(Base Project Allocation - $1,000,000)

 

26(viii) Moon Township

 

27(A) Construction, infrastructure
28improvements and other costs related
29to development of business park on
30site 7 at Pittsburgh International

 

1Airport

 

2Project Allocation

7,000,000

3(Base Project Allocation - $7,000,000)

 

4(B) Construction, infrastructure
5improvements and other costs related
6to development of Cherrington Commerce
7Center Phase II

 

8Project Allocation

10,000,000

9(Base Project Allocation -
10$10,000,000)

 

11(C) Acquisition, construction, site work
12and infrastructure improvements for a
13development project in Moon Township

 

14Project Allocation

10,000,000

15(Base Project Allocation -
16$10,000,000)

 

17(D) Acquisition, construction,
18infrastructure improvements and
19related costs for the development of
20an athletic and multipurpose arena at
21Robert Morris University

 

22Project Allocation

15,000,000

23(Base Project Allocation -
24$15,000,000)

 

<-25(E) Construction, acquisition,
26infrastructure and related costs for
27development of Omega Corporate Center
28project

 

29Project Allocation

5,000,000

30(Base Project Allocation - $5,000,000)

 

1(F) Construction, acquisition,
2infrastructure and related costs for
3development of Alpha Corporate Center
4project

 

5Project Allocation

25,000,000

6(Base Project Allocation -
7$25,000,000)

 

8(ix) Mt. Oliver Borough

 

9(A) Acquisition, construction,
10infrastructure and other related costs
11for Brownsville Road Corridor
12redevelopment projects

 

13Project Allocation

2,500,000

14(Base Project Allocation - $2,500,000)

 

<-15(ix.1) North Versailles Township

 

16(A) Acquisition, construction,
17infrastructure, redevelopment and
18other related costs for Pittsburgh
19Plaza East Shopping Center

 

20Project Allocation

20,000,000

21(Base Project Allocation -
22$20,000,000)

 

<-23(ix.1) (ix.2) Oakmont Borough

 

24(A) Construction, rehabilitation and
25other related costs for senior living
26project

 

27Project Allocation

2,950,000

28(Base Project Allocation - $2,950,000)

 

29(B) Construction, redevelopment,
30infrastructure, renovation, abatement

 

1of hazardous materials and other
2related costs for projects for
3Presbyterian SeniorCare Center

 

4Project Allocation

1,000,000

5(Base Project Allocation - $1,000,000)

 

<-6(ix.2) (ix.3) Penn Hills Township

 

7(A) Acquisition, construction and other
8related costs for emergency medical
9services building in Penn Hills

 

10Project Allocation

600,000

11(Base Project Allocation - $600,000)

 

12(x) Plum Borough

 

13(A) Construction, infrastructure
14improvements and other costs related
15to Plum Municipal Center

 

16Project Allocation

3,500,000

17(Base Project Allocation - $3,500,000)

 

18(xi) Robinson Township

 

19(A) Construction, infrastructure and
20other related costs for Bradley Center
21expansion project

 

22Project Allocation

500,000

23(Base Project Allocation - $500,000)

 

24(B) Acquisition, construction,
25infrastructure and other related costs
26for expansion of Industrial Scientific
27Global Headquarters

 

28Project Allocation

10,000,000

29(Base Project Allocation -
30$10,000,000)

 

<-1(C) Acquisition, construction,
2infrastructure, redevelopment and
3other related costs for development of
4business park

 

5Project Allocation

2,000,000

6(Base Project Allocation - $2,000,000)

 

7(D) Construction, acquisition,
8infrastructure and related costs for
9redevelopment of Marquis Office Plaza,
10including, but not limited to, a new
11parking garage

 

12Project Allocation

2,000,000

13(Base Project Allocation - $2,000,000)

 

14(xii) Ross Township

 

15(A) Acquisition, demolition,
16infrastructure and construction of
17public facilities in McKnight Road
18business corridor

 

19Project Allocation

2,250,000

20(Base Project Allocation - $2,250,000)

 

21(B) Acquisition, demolition,
22infrastructure and construction of
23public facilities for purposes of
24redevelopment of Northway Mall on
25McKnight Road

 

26Project Allocation

2,250,000

27(Base Project Allocation - $2,250,000)

 

28(C) Acquisition, demolition,
29infrastructure and construction of
30public facilities for parks,

 

1recreation and open space

 

2Project Allocation

4,000,000

3(Base Project Allocation - $4,000,000)

 

<-4(D) Acquisition, construction,
5infrastructure, redevelopment,
6abatement of hazardous materials and
7other related costs for The Perry
8Shops located on Perry Highway

 

9Project Allocation

10,000,000

10(Base Project Allocation -
11$10,000,000)

 

12(xiii) Sewickley Borough

 

13(A) Construction, infrastructure and
14other related costs for renovation of
155 South Patient Unit at Heritage
16Valley Sewickley Hospital facility

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(B) Construction, infrastructure and
20other related costs for renovation and
21reconstruction of School of Nursing
22building at Heritage Valley Sewickley
23campus

 

24Project Allocation

1,000,000

25(Base Project Allocation - $1,000,000)

 

26(C) Construction, infrastructure and
27other related costs for the design,
28expansion and renovation of surgical
29services department at Heritage Valley
30Sewickley Hospital facility

 

1Project Allocation

1,000,000

2(Base Project Allocation - $1,000,000)

 

<-3(xiii.1) Sharpsburg Borough

 

4(A) Infrastructure and other related
5costs for water and sewer system
6improvements

 

7Project Allocation

1,850,000

8(Base Project Allocation - $1,850,000)

 

9(xiv) West Deer Township

 

10(A) Infrastructure, rehabilitation,
11construction and other related costs,
12including the abatement of hazardous
13materials, for development of senior
14citizen center

 

15Project Allocation

800,000

16(Base Project Allocation - $800,000)

 

17(xv) West Mifflin Borough

 

18(A) Acquisition, construction,
19infrastructure and other related costs
20for aviation, industrial and
21commercial site development and
22improvements at or surrounding
23Allegheny County Airport

 

24Project Allocation

20,000,000

25(Base Project Allocation -
26$20,000,000)

 

<-27(B) Acquisition, construction,
28infrastructure, redevelopment and
29other related costs for the
30development of a mixed-use facility

 

1Project Allocation

10,000,000

2(Base Project Allocation -
3$10,000,000)

 

<-4(xvi) White Oak Borough

 

5(A) Construction, infrastructure and
6other related costs for projects in
7White Oak Business District

 

8Project Allocation

1,500,000

9(Base Project Allocation - $1,500,000)

 

10(3) Armstrong County

 

11(i) County projects

 

12(A) Infrastructure, construction and
13other related costs for renovations to
14Belmont Complex indoor multiuse
15facility

 

16Project Allocation

1,500,000

17(Base Project Allocation - $1,500,000)

 

18(B) Acquisition, infrastructure,
19construction and other related costs,
20including abatement of hazardous
21materials, for public school buildings
22adaptive reuse project

 

23Project Allocation

5,000,000

24(Base Project Allocation - $5,000,000)

 

25(C) Acquisition, infrastructure,
26construction and other related costs
27for downtown revitalization projects,
28including façade improvements,
29landscaping, lighting, parking lots
30and streetscape improvements

 

1Project Allocation

2,000,000

2(Base Project Allocation - $2,000,000)

 

3(ii) Armstrong County Industrial Development
4Authority

 

5(A) Acquisition, infrastructure and
6construction for development of new
7industrial park

 

8Project Allocation

3,000,000

9(Base Project Allocation - $3,000,000)

 

10(4) Beaver County

 

<-11(i) County projects

 

12(A) Redevelopment, restoration and other
13related costs for the former
14Pittsburgh and Lake Erie Railroad
15passenger station to be used as a
16multipurpose meeting/event space

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(B) Construction, infrastructure and
20other related costs for public works
21building and fire station in Big
22Beaver Borough

 

23Project Allocation

500,000

24(Base Project Allocation - $500,000)

 

25(ii) City of Aliquippa

 

26(A) Acquisition, construction,
27infrastructure and other related costs
28for business or manufacturing facility
29associated with the petrochemical
30industry

 

1Project Allocation

10,000,000

2(Base Project Allocation -
3$10,000,000)

 

4(i) <-(iii) Beaver County Corporation for
5Economic Development

 

6(A) Infrastructure, site improvements and
7other related costs for construction
8of compressed natural gas fueling
9facility

 

10Project Allocation

1,000,000

11(Base Project Allocation - $1,000,000)

 

12(B) Acquisition, infrastructure,
13abatement of hazardous materials,
14construction and other related costs
15for redevelopment of industrial
16properties located within Ellwood City

 

17Project Allocation

15,000,000

18(Base Project Allocation -
19$15,000,000)

 

20(C) Acquisition, infrastructure,
21abatement of hazardous materials,
22construction and other related costs
23for redevelopment and improvement of
24industrial sites located within Potter
25Township

 

26Project Allocation

15,000,000

27(Base Project Allocation -
28$15,000,000)

 

29(ii) <-(iv) Redevelopment Authority of Beaver
30County

 

1(A) Renovation and rehabilitation of
2patient rooms and corridors at
3Heritage Valley Beaver Hospital
4facility

 

5Project Allocation

1,000,000

6(Base Project Allocation - $1,000,000)

 

7(B) Rehabilitation, construction and
8other related costs for renovations to
9radiology department at Heritage
10Valley Beaver Hospital facility

 

11Project Allocation

1,000,000

12(Base Project Allocation - $1,000,000)

 

13(C) Infrastructure, construction and
14other related costs for rehabilitation
15and restoration of historic former
16Pittsburgh & Lake Erie Railroad
17passenger station

 

18Project Allocation

975,000

19(Base Project Allocation - $975,000)

 

<-20(v) Baden Borough

 

21(A) Acquisition, construction,
22infrastructure, redevelopment and
23other related costs for Baden Academy
24Charter School expansion project

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(vi) Ellwood City Borough

 

28(A) Acquisition, construction,
29infrastructure, redevelopment,
30abatement of hazardous materials and

 

1other related costs for redevelopment
2projects

 

3Project Allocation

15,000,000

4(Base Project Allocation -
5$15,000,000)

 

6(vii) Franklin Township

<-

7(A) Construction and other related costs
8for Hereford Manor dams

 

9Project Allocation

7,500,000

10(Base Project Allocation - $7,500,000)

 

11(vii) Harmony Township

<-

12(viii) Harmony Township

<-

13(A) Construction, infrastructure and
14other related costs for CNG conversion
15project

 

16Project Allocation

1,000,000

17(Base Project Allocation - $1,000,000)

 

<-18(B) Acquisition, construction,
19infrastructure, redevelopment and
20other related costs for an industrial
21park

 

22Project Allocation

20,000,000

23(Base Project Allocation -
24$20,000,000)

 

25(5) Bedford County

 

<-26(i) (Reserved)

 

<-27(i) County projects

 

28(A) Acquisition, construction,
29infrastructure and other related costs
30for rehabilitation of 8.5 miles of

 

1abandoned Pennsylvania Turnpike as
2multiuse trail.

 

3Project Allocation

4,000,000

4(Base Project Allocation - $4,000,000)

 

<-5(ii) Bedford County Development Association

 

6(A) Preparation of 90 acres of Bedford
7County Business Park II as shovel-
8ready sites to attract new businesses
9to the area

 

10Project Allocation

2,375,000

11(Base Project Allocation - $2,375,000)

 

12(6) Berks County

 

13(i) County projects

 

14(A) Acquisition, infrastructure,
15construction and other related costs
16for development of 104 acres for
17expansion of Reading Health System

 

18Project Allocation

3,500,000

19(Base Project Allocation - $3,500,000)

 

<-20(B) Acquisition, construction,
21infrastructure, redevelopment and
22other related costs for projects for
23Berks Community Health Center

 

24Project Allocation

15,000,000

25(Base Project Allocation -
26$15,000,000)

 

27(C) Rehabilitation of railroad, including
28track improvements, siding extensions,
29visitors center, equipment and
30equipment maintenance facility,

 

1construction and related work to
2enhance economic development
3opportunities and preserve corridor
4for future freight traffic in Berks
5and Montgomery Counties

 

6Project Allocation

10,000,000

7(Base Project Allocation -
8$10,000,000)

 

9(ii) Amity Township

 

10(A) Acquisition, infrastructure,
11construction and other related costs
12for development of retail and business
13park

 

14Project Allocation

1,300,000

15(Base Project Allocation - $1,300,000)

 

16(iii) Boyertown Borough

 

17(A) Construction, infrastructure and
18other related costs for rehabilitation
19of historic Civil War era railroad
20project

 

21Project Allocation

4,000,000

22(Base Project Allocation - $4,000,000)

 

23(iv) City of Reading

 

24(A) Construction, infrastructure and
25other related costs for early learning
26center at Albright College

 

27Project Allocation

1,500,000

28(Base Project Allocation - $1,500,000)

 

29(B) Construction, infrastructure and
30other related costs for Albright

 

1College Co-Generation Plant expansion
2project

 

3Project Allocation

2,500,000

4(Base Project Allocation - $2,500,000)

 

5(C) Construction, infrastructure and
6other related costs for Albright
7College Track and Field Facility
8project

 

9Project Allocation

1,500,000

10(Base Project Allocation - $1,500,000)

 

11(D) Construction, infrastructure and
12other related costs for Albright
13College Library Holocaust Resource
14Center project

 

15Project Allocation

500,000

16(Base Project Allocation - $500,000)

 

17(E) Renovation, restoration,
18reconstruction, infrastructure
19improvements and related costs for
20Reading Public Museum

 

21Project Allocation

1,112,000

22(Base Project Allocation - $1,112,000)

 

23(F) Construction, infrastructure
24improvements and other related costs
25for installation of natural gas
26refueling station at Evergreen
27Community Power site

 

28Project Allocation

5,000,000

29(Base Project Allocation - $5,000,000)

 

30(G) Construction, reconstruction,

 

1rehabilitation, remediation,
2infrastructure improvements and other
3related costs for redevelopment of
4existing building at Evergreen
5Community Power site

 

6Project Allocation

5,000,000

7(Base Project Allocation - $5,000,000)

 

8(H) Rehabilitation, construction and
9renovation of rail infrastructure to
10service Evergreen Community Power
11site, including track construction and
12rebuild, property and right-of-way
13acquisition, design, engineering,
14permitting, rails, ties, ballast,
15crossings, switches, turnouts, repair
16of grade crossings, track and other
17repairs and rebuilds, construction of
18rail service and any other related
19costs

 

20Project Allocation

5,000,000

21(Base Project Allocation - $5,000,000)

 

22(I) Construction, infrastructure
23improvements and related costs for the
24Reading Area Community College Berks
25Hall renovation and conservation
26project

 

27Project Allocation

600,000

28(Base Project Allocation - $600,000)

 

29(J) Construction, infrastructure
30improvements and related costs for the

 

1Reading Area Community College
2pedestrian safety, gateway and traffic
3improvement project

 

4Project Allocation

1,178,000

5(Base Project Allocation - $1,178,000)

 

<-6(iv.1) Cumru Township

 

7(A) Acquisition, construction,
8infrastructure, development and other
9costs related to development of
10industrial site for new and expanding
11businesses

 

12Project Allocation

20,000,000

13(Base Project Allocation -
14$20,000,000)

 

15(v) Exeter Township

 

16(A) Construction, infrastructure and
17other related costs for Lincoln
18Business Park redevelopment project

 

19Project Allocation

5,000,000

20(Base Project Allocation - $5,000,000)

 

21(B) Construction, site preparation,
22infrastructure improvements and
23related costs for new Emergency
24Services Building

 

25Project Allocation

2,500,000

26(Base Project Allocation - $2,500,000)

 

27(vi) Fleetwood Borough

 

28(A) Acquisition, infrastructure,
29renovations and other related costs
30for Fleetwood Tannery/Fleetwood Auto

 

1Body Complex project

 

2Project Allocation

5,000,000

3(Base Project Allocation - $5,000,000)

 

4(B) Acquisition, infrastructure,
5renovations and other related costs
6for revitalization of Fleetwood
7Borough Central Business District

 

8Project Allocation

2,500,000

9(Base Project Allocation - $2,500,000)

 

10(vi.1) Kutztown Borough

 

11(A) Revitalization of
12industrial/commercial sites, including
13acquisition, rehabilitation,
14construction, infrastructure
15development and related costs

 

16Project Allocation

5,000,000

17(Base Project Allocation - $5,000,000)

 

<-18(B) Acquisition, demolition,
19construction, rehabilitation and
20redevelopment of multiple properties
21to create a municipal government
22center

 

23Project Allocation

1,000,000

24(Base Project Allocation - $1,000,000)

 

<-25(vi.2) Leesport Borough

 

26(A) Construction, renovation and other
27related costs for fire station

 

28Project Allocation

1,250,000

29(Base Project Allocation - $1,250,000)

 

<-30(vi.2) (vi.3) Lyons Borough

 

1(A) Construction, infrastructure,
2abatement of hazardous materials and
3other related costs for the
4redevelopment and rehabilitation of
5manufacturing facility

 

6Project Allocation

17,000,000

7(Base Project Allocation -
8$17,000,000)

 

9(vii) Muhlenberg Township

 

10(A) Acquisition, infrastructure,
11renovations and other related costs
12for NKG Metals facility redevelopment
13and reuse project

 

14Project Allocation

5,000,000

15(Base Project Allocation - $5,000,000)

 

16(B) Acquisition, infrastructure,
17renovations and other related costs
18for Fifth Street Highway Corridor
19revitalization project

 

20Project Allocation

10,000,000

21(Base Project Allocation -
22$10,000,000)

 

<-23(viii) Snyder Township

 

24(A) Renovation and other related costs to
25replace and upgrade facility
26infrastructure of Tyrone Hospital

 

27Project Allocation

1,650,000

28(Base Project Allocation - $1,650,000)

 

29(ix) Borough of Topton

 

30(A) Construction, infrastructure and

 

1other related costs for renovations to
2historic Old Main building of Diakon
3Lutheran Home at Topton

 

4Project Allocation

3,000,000

5(Base Project Allocation - $3,000,000)

 

6(viii) <-(x) West Reading Borough

 

7(A) Acquisition, infrastructure,
8renovations and other related costs
9for Reading Health System surgical
10tower and related facilities

 

11Project Allocation

3,500,000

12(Base Project Allocation - $3,500,000)

 

13(7) Blair County

 

<-14(i) City of Altoona

 

15(A) Construction, infrastructure and
16other related costs for the expansion
17of Altoona Regional Health System,
18including new operating rooms,
19additional lab space and vision center

 

20Project Allocation

1,000,000

21(Base Project Allocation - $1,000,000)

 

22(i) <-(ii) Altoona-Blair County Development
23Corporation

 

24(A) Acquisition, abatement of hazardous
25materials, renovations and
26rehabilitation of regional arts center

 

27Project Allocation

2,000,000

28(Base Project Allocation - $2,000,000)

 

29(8) Bradford County

 

<-30(i) (Reserved)

 

1(ii) Borough of Towanda

 

2(A) Acquisition, construction,
3infrastructure and other related costs
4for expansion of Memorial Hospital

 

5Project Allocation

5,000,000

6(Base Project Allocation - $5,000,000)

 

7(i) (iii)<- Wyalusing Township

 

8(A) Acquisition, site preparation,
9remediation, infrastructure
10improvements and construction of
11Wyalusing Professional Park

 

12Project Allocation

8,000,000

13(Base Project Allocation - $8,000,000)

 

14(9) Bucks County

 

15(i) County projects

 

16(A) Acquisition, construction,
17infrastructure, redevelopment and
18other related costs for ARIA Health
19System urgent care facilities

 

20Project Allocation

1,000,000

21(Base Project Allocation - $1,000,000)

 

22(B) Acquisition, construction,
23infrastructure, redevelopment and
24other related costs for ARIA Health
25System facilities to provide medical
26services, conduct research and other
27related activities

 

28Project Allocation

10,000,000

29(Base Project Allocation -
30$10,000,000)

 

1(C) Acquisition, infrastructure,
2redevelopment, construction and other
3related costs for Fairless Hills rail
4expansion project at Keystone
5Industrial Port Complex

 

6Project Allocation

5,750,000

7(Base Project Allocation - $5,750,000)

 

8(D) Acquisition, rehabilitation,
9construction and other related costs
10for renovation of former warehouse
11space and development of
12entrepreneurial scientists research
13clusters

 

14Project Allocation

4,500,000

15(Base Project Allocation - $4,500,000)

 

16(ii) Bucks County Industrial Development
17Authority

 

18(A) Acquisition, infrastructure,
19redevelopment and other related costs
20for construction of rail service to
21Riverside Industrial Park

 

22Project Allocation

2,100,000

23(Base Project Allocation - $2,100,000)

 

24(iii) Redevelopment Authority of Bucks County

 

25(A) Acquisition, infrastructure,
26construction and other related costs
27for rehabilitation of Grundy
28Powerhouse

 

29Project Allocation

525,000

30(Base Project Allocation - $525,000)

 

1(B) Acquisition, infrastructure,
2construction and other related costs
3for rehabilitation and development of
4PECO building in Penndel Borough

 

5Project Allocation

600,000

6(Base Project Allocation - $600,000)

 

7(C) Acquisition, infrastructure,
8construction and other related costs
9for redevelopment of Stocks Waterfront
10into mixed-use facility

 

11Project Allocation

780,000

12(Base Project Allocation - $780,000)

 

13(D) Acquisition, infrastructure,
14redevelopment, construction and other
15related costs for infrastructure
16improvements to Route 13 Industrial
17Corridor

 

18Project Allocation

1,100,000

19(Base Project Allocation - $1,100,000)

 

20(E) Acquisition, infrastructure,
21construction and other related costs
22for redevelopment of USI Lighting
23manufacturing site

 

24Project Allocation

1,200,000

25(Base Project Allocation - $1,200,000)

 

26(F) Infrastructure, construction and
27other related costs for improvements
28to Edgely Industrial Park, including
29roadways, storm water management,
30lighting and other infrastructure

 

1Project Allocation

1,200,000

2(Base Project Allocation - $1,200,000)

 

3(G) Acquisition, infrastructure,
4construction and other related costs
5for demolition of Mill Run Retirement
6Community and redevelopment of
7property

 

8Project Allocation

1,200,000

9(Base Project Allocation - $1,200,000)

 

10(H) Acquisition, demolition,
11infrastructure improvements,
12construction, renovation and other
13related costs for development of
14public/private academic university

 

15Project Allocation

4,000,000

16(Base Project Allocation - $4,000,000)

 

17(I) Infrastructure, construction,
18redevelopment and other related costs
19for senior housing project in Telford

 

20Project Allocation

10,000,000

21(Base Project Allocation -
22$10,000,000)

 

23(iv) Bensalem Township

 

24(A) Acquisition, infrastructure and other
25costs related to construction of new
26Newport fire house

 

27Project Allocation

1,500,000

28(Base Project Allocation - $1,500,000)

 

<-29(B) Renovation, rehabilitation and other
30related costs for historic Growden

 

1Mansion

 

2Project Allocation

500,000

3(Base Project Allocation - $500,000)

 

4(C) Construction and other related costs
5for affordable housing for disabled
6veterans

 

7Project Allocation

5,000,000

8(Base Project Allocation - $5,000,000)

 

9(D) Construction and other related costs
10for transitional housing for women who
11have completed their treatment program
12but still struggle with homelessness

 

13Project Allocation

600,000

14(Base Project Allocation - $600,000)

 

15(E) Construction, infrastructure,
16redevelopment and other related costs
17for family and community outreach
18center that offers recovery services
19to individuals with addictions

 

20Project Allocation

1,000,000

21(Base Project Allocation - $1,000,000)

 

22(F) Acquisition, construction,
23infrastructure, redevelopment and
24other related costs for a cultural and
25community center with business
26district improvements

 

27Project Allocation

2,500,000

28(Base Project Allocation - $2,500,000)

 

29(G) Construction and other related costs
30for new access road to assist in

 

1redevelopment of industrial zone

 

2Project Allocation

2,000,000

3(Base Project Allocation - $2,000,000)

 

4(H) Construction, infrastructure,
5redevelopment and other related costs
6for residential drug and alcohol
7addiction treatment facility for first
8responders, corrections officers and
9combat veterans who are seeking
10inpatient treatment

 

11Project Allocation

500,000

12(Base Project Allocation - $500,000)

 

13(iv.1) Bristol Township

 

14(A) Construction, acquisition and other
15related costs to redevelop and
16revitalize vacant portion of Lower
17Bucks Hospital for treatment and
18rehabilitation facility

 

19Project Allocation

1,100,000

20(Base Project Allocation - $1,100,000)

 

21(B) Acquisition, construction,
22infrastructure, redevelopment and
23other related costs for public health
24and safety projects in Bristol Borough
25and Bristol Township

 

26Project Allocation

4,000,000

27(Base Project Allocation - $4,000,000)

 

28(iv.2) Bristol Borough

 

29(A) Construction, infrastructure and
30other related costs for projects along

 

1Otter Creek and Adams Hollow Creek

 

2Project Allocation

1,000,000

3(Base Project Allocation - $1,000,000)

 

4(v) Chalfont Borough

 

5(A) Acquisition, construction,
6infrastructure, pedestrian
7enhancements and other costs related
8to transit-oriented development and
9downtown revitalization

 

10Project Allocation

10,000,000

11(Base Project Allocation -
12$10,000,000)

 

<-13(v.1) Doylestown Borough

 

14(A) Acquisition, construction,
15infrastructure, renovation and other
16related costs for redevelopment of
17PennDOT maintenance site facility for
18urban park and office space

 

19Project Allocation

1,415,000

20(Base Project Allocation - $1,415,000)

 

21(B) Construction, reconstruction and
22other related costs for Doylestown
23Hospital maternity center

 

24Project Allocation

1,100,000

25(Base Project Allocation - $1,100,000)

 

<-26(v.2) Falls Township

 

27(A) Acquisition, infrastructure, rail
28improvements and other related costs
29for development of industrial facility
30at Keystone Industrial Port Complex

 

1Project Allocation

15,000,000

2(Base Project Allocation -
3$15,000,000)

 

4(vi) Lower Southampton Township

 

5(A) Infrastructure, construction,
6renovations and other related costs
7for new public works building

 

8Project Allocation

1,000,000

9(Base Project Allocation - $1,000,000)

 

10(B) Acquisition, infrastructure,
11construction and other related costs
12for new police department headquarters

 

13Project Allocation

2,000,000

14(Base Project Allocation - $2,000,000)

 

<-15(C) Construction, redevelopment,
16renovation and other related costs for
17Lower Southampton Firehouse

 

18Project Allocation

500,000

19(Base Project Allocation - $500,000)

 

20(D) Construction, infrastructure,
21redevelopment, acquisition and other
22related costs for new police station

 

23Project Allocation

2,000,000

24(Base Project Allocation - $2,000,000)

 

25(E) Construction, infrastructure,
26redevelopment and other related costs
27for new public works building

 

28Project Allocation

1,000,000

29(Base Project Allocation - $1,000,000)

 

30(vii) Middletown Township

 

1(A) Infrastructure, construction,
2rehabilitation and other related costs
3for roadway improvements to Big Oak
4Road, located within industrial park

 

<-5Project Allocation

600,000

6(Base Project Allocation - $600,000)

 

<-7Project Allocation

800,000

8(Base Project Allocation - $800,000)

 

9(B) Infrastructure, construction and
10other related costs for rehabilitation
11of municipal building

 

12Project Allocation

1,000,000

13(Base Project Allocation - $1,000,000)

 

14(C) Acquisition, infrastructure,
15construction and other related costs
16for redevelopment of school buildings
17for future public use

 

18Project Allocation

2,000,000

19(Base Project Allocation - $2,000,000)

 

<-20(D) Construction, renovation,
21infrastructure and other related costs
22for expansion of St. Mary Medical
23Center

 

24Project Allocation

25,000,000

25(Base Project Allocation -
26$25,000,000)

 

27(E) Construction, acquisition,
28infrastructure and other related costs
29for redevelopment of former school
30building for public use

 

1Project Allocation

2,000,000

2(Base Project Allocation - $2,000,000)

 

3(F) Construction, renovation,
4infrastructure and other related costs
5for municipal building in disrepair

 

6Project Allocation

1,000,000

7(Base Project Allocation - $1,000,000)

 

8(vii.1) Milford Township

 

9(A) Land acquisition, construction,
10infrastructure and other related costs
11for development and expansion of
12hospital

 

13Project Allocation

15,000,000

14(Base Project Allocation -
15$15,000,000)

 

16(viii) Northampton Township

 

17(A) Acquisition, infrastructure,
18construction and other related costs
19for a new police department
20headquarters and renovations to
21existing facilities

 

22Project Allocation

2,500,000

23(Base Project Allocation - $2,500,000)

 

24(ix) Quakertown Borough

 

25(A) Acquisition, infrastructure,
26construction and other related costs
27for new downtown infill project
28consisting of office and retail
29complex

 

30Project Allocation

3,500,000

1(Base Project Allocation - $3,500,000)

 

<-2(ix.1) Upper Southampton Township

 

3(A) Construction and other related costs
4for new public works building and
5renovation of existing public works
6building for general government use

 

7Project Allocation

1,250,000

8(Base Project Allocation - $1,250,000)

 

9(B) Land acquisition for recreation and
10open space

 

11Project Allocation

1,000,000

12(Base Project Allocation - $1,000,000)

 

13(x) Warwick Township

 

14(A) Acquisition, infrastructure,
15construction and other related costs
16for township building renovations and
17upgrades

 

18Project Allocation

1,000,000

19(Base Project Allocation - $1,000,000)

 

20(B) Infrastructure, construction,
21rehabilitation and other related costs
22for roadway improvements to Stout
23Drive, which provides ingress and
24egress to industrial park

 

25Project Allocation

1,500,000

26(Base Project Allocation - $1,500,000)

 

27(10) Butler County

 

28(i) Butler County Redevelopment Authority

 

29(A) Site preparation activity, including
30onsite utility construction, on

 

1property along SR 0019 in Jackson
2Township to support mixed-use
3development

 

4Project Allocation

10,000,000

5(Base Project Allocation -
6$10,000,000)

 

7(B) Construction of infrastructure,
8capital facilities and site
9development activities for
10construction of a mixed-use
11development in Route 228 corridor

 

12Project Allocation

10,000,000

13(Base Project Allocation -
14$10,000,000)

 

15(ii) Cranberry Township

 

16(A) Acquisition, infrastructure,
17rehabilitation and other related costs
18for construction of public plaza and
19other amenities in Route 228 corridor

 

20Project Allocation

1,000,000

21(Base Project Allocation - $1,000,000)

 

22(B) Acquisition, infrastructure,
23construction and other related costs
24for expansion of North Boundary Park

 

25Project Allocation

1,000,000

26(Base Project Allocation - $1,000,000)

 

27(C) Acquisition, infrastructure,
28construction, and other related costs,
29including abatement of hazardous
30materials, for Fernway redevelopment

 

1project

 

2Project Allocation

1,500,000

3(Base Project Allocation - $1,500,000)

 

4(D) Acquisition, construction, site
5development and infrastructure costs
6related to economic development
7project in Commonwealth and Executive
8Drive corridor

 

9Project Allocation

2,500,000

10(Base Project Allocation - $2,500,000)

 

11(E) Acquisition, infrastructure,
12rehabilitation and other related costs
13for construction of new public library

 

14Project Allocation

2,500,000

15(Base Project Allocation - $2,500,000)

 

16(F) Acquisition, rehabilitation, site
17development and infrastructure costs
18related to economic development
19project in Route 228 corridor

 

20Project Allocation

4,000,000

21(Base Project Allocation - $4,000,000)

 

22(G) Acquisition, rehabilitation, site
23development and infrastructure costs
24related to economic development
25project in Route 19 corridor

 

26Project Allocation

5,000,000

27(Base Project Allocation - $5,000,000)

 

28(H) Acquisition, infrastructure,
29construction and other costs for
30redevelopment and implementation of

 

1Route 19 Main Street program

 

2Project Allocation

5,000,000

3(Base Project Allocation - $5,000,000)

 

4(iii) Zelienople Borough

 

5(A) Acquisition, infrastructure,
6construction and renovations of Main
7Street corridor as part of Central
8Business District revitalization
9project.

 

10Project Allocation

3,900,000

11(Base Project Allocation - $3,900,000)

 

<-12(B) Construction, infrastructure,
13redevelopment and other related costs
14for development of Sensory House
15Museum on Glade Run's Zelienople
16campus for individuals with autism and
17other developmental disabilities

 

18Project Allocation

1,000,000

19(Base Project Allocation - $1,000,000)

 

20(C) Construction, redevelopment and other
21related costs for development of
22Jeremiah Village, a residential
23community for individuals with autism

 

24Project Allocation

5,000,000

25(Base Project Allocation - $5,000,000)

 

26(D) Construction, infrastructure,
27redevelopment and other related costs
28for learning center and chapel on
29Zelienople campus of Glade Run
30Lutheran Services

 

1Project Allocation

750,000

2(Base Project Allocation - $750,000)

 

3(11) Cambria County

 

4(i) County projects

 

5(A) Acquisition, construction, site
6development, infrastructure and
7transportation improvements and other
8related costs for Conemaugh Health
9System for an ambulatory care center

 

10Project Allocation

5,000,000

11(Base Project Allocation - $5,000,000)

 

<-12(B) Acquisition, construction,
13infrastructure, redevelopment,
14abatement of hazardous materials and
15other related costs for acid mine
16drainage cleanup infrastructure

 

17Project Allocation

10,000,000

18(Base Project Allocation -
19$10,000,000)

 

20(C) Acquisition, construction,
21infrastructure and other related costs
22for ambulatory care center

 

23Project Allocation

5,000,000

24(Base Project Allocation - $5,000,000)

 

25(D) Acquisition, construction,
26infrastructure, abatement of hazardous
27materials and other related costs for
28economic development project

 

29Project Allocation

5,000,000

30(Base Project Allocation - $5,000,000)

 

1(E) Acquisition, construction,
2infrastructure and other related costs
3for natural gas refueling station

 

4Project Allocation

1,000,000

5(Base Project Allocation - $1,000,000)

 

6(F) Acquisition, construction,
7infrastructure and other related costs
8for natural gas refueling station in
9Cambria County Industrial Park

 

10Project Allocation

5,000,000

11(Base Project Allocation - $5,000,000)

 

12(G) Acquisition, construction,
13infrastructure and other related costs
14for outdoor recreational tourism
15facility and related projects

 

16Project Allocation

1,000,000

17(Base Project Allocation - $1,000,000)

 

18(H) Rehabilitation, construction and
19renovation of rail infrastructure to
20serve an economic development project

 

21Project Allocation

10,000,000

22(Base Project Allocation -
23$10,000,000)

 

24(ii) Cambria Township

 

25(A) Construction, infrastructure and
26other related costs for Cambria County
27Prison improvement project

 

28Project Allocation

2,500,000

29(Base Project Allocation - $2,500,000)

 

30(B) Acquisition, construction,

 

1infrastructure improvements and other
2related costs for the installation of
3a natural gas refueling station in
4Cambria County Industrial Park

 

5Project Allocation

5,000,000

6(Base Project Allocation - $5,000,000)

 

<-7(C) Construction, infrastructure and
8other related costs for natural gas-
9powered data center expansion

 

10Project Allocation

5,000,000

11(Base Project Allocation - $5,000,000)

 

12(iii) City of Johnstown

 

13(A) Construction, infrastructure and
14other related costs for Cambria County
15War Memorial improvement project

 

16Project Allocation

1,250,000

17(Base Project Allocation - $1,250,000)

 

18(B) Construction, reconstruction,
19rehabilitation, remediation
20infrastructure improvements and other
21related costs for the redevelopment
22and reuse of historic Conrad Building

 

23Project Allocation

3,000,000

24(Base Project Allocation - $3,000,000)

 

25(C) Acquisition, construction,
26reconstruction, rehabilitation,
27upgrades, related infrastructure
28improvements, including street-scape
29and pedestrian improvements and other
30related costs for Conemaugh Medical

 

1Park

 

2Project Allocation

5,000,000

3(Base Project Allocation - $5,000,000)

 

4(D) Demolition and construction of
5various properties to revitalize the
6commercial, retail and housing
7districts within the city and related
8infrastructure

 

9Project Allocation

10,000,000

10(Base Project Allocation -
11$10,000,000)

 

<-12(E) Acquisition, construction,
13infrastructure, redevelopment,
14abatement of hazardous materials and
15other related costs for acid mine
16drainage and alternative energy
17projects

 

18Project Allocation

10,000,000

19(Base Project Allocation -
20$10,000,000)

 

21(F) Acquisition, construction,
22infrastructure, redevelopment,
23abatement of hazardous materials and
24other related costs for a new
25education facility

 

26Project Allocation

5,000,000

27(Base Project Allocation - $5,000,000)

 

28(G) Acquisition, construction,
29infrastructure, redevelopment,
30abatement of hazardous materials and

 

1other related costs for emergency
2department project

 

3Project Allocation

7,500,000

4(Base Project Allocation - $7,500,000)

 

5(H) Acquisition, construction,
6infrastructure and other related costs
7for projects related to Conemaugh
8Medical Park

 

9Project Allocation

5,000,000

10(Base Project Allocation - $5,000,000)

 

11(I) Construction, infrastructure,
12redevelopment, abatement of hazardous
13materials and other related costs for
14redevelopment project at site of
15former Conrad building

 

16Project Allocation

3,000,000

17(Base Project Allocation - $3,000,000)

 

18(J) Construction, infrastructure and
19other related costs for projects
20relating to Johnstown Public Safety
21Building

 

22Project Allocation

500,000

23(Base Project Allocation - $500,000)

 

24(K) Construction, infrastructure and
25other related costs for Point Stadium
26projects

 

27Project Allocation

500,000

28(Base Project Allocation - $500,000)

 

29(iv) Cresson Township

 

30(A) Construction, demolition,

 

1renovations, infrastructure and other
2costs related to expansion of the
3campus of Mt. Aloysius College

 

4Project Allocation

20,000,000

5(Base Project Allocation -
6$20,000,000)

 

7(v) Ebensburg Borough

 

8(A) Construction, infrastructure and
9other related costs for Cambria County
10Courthouse renovation project

 

11Project Allocation

500,000

12(Base Project Allocation - $500,000)

 

13(vi) Hastings Borough

 

14(A) Acquisition, construction,
15reconstruction, rehabilitation,
16upgrade, infrastructure improvements
17and other related costs for the
18Conemaugh Miners Medical Center in
19Hastings and surrounding
20municipalities

 

21Project Allocation

5,000,000

22(Base Project Allocation - $5,000,000)

 

<-23(B) Acquisition, construction,
24infrastructure and other related costs
25for medical center projects in the
26borough and surrounding municipalities

 

27Project Allocation

5,000,000

28(Base Project Allocation - $5,000,000)

 

29(vii) Loretto Borough

 

30(A) Construction, infrastructure and

 

1other related costs for renovation and
2expansion of Saint Francis University
3School of Health Sciences complex

 

4Project Allocation

10,000,000

5(Base Project Allocation -
6$10,000,000)

 

<-7(viii) Richland Township

 

8(A) Acquisition, construction,
9infrastructure, redevelopment,
10abatement of hazardous materials and
11other related costs for ambulatory
12care center

 

13Project Allocation

5,000,000

14(Base Project Allocation - $5,000,000)

 

15(12) Cameron County

 

16(i) County projects

 

17(A) Acquisition, infrastructure,
18construction and other related costs
19for economic project in the county

 

20Project Allocation

10,000,000

21(Base Project Allocation -
22$10,000,000)

 

23(13) Carbon County

 

24(i) County projects

 

25(A) Site development, infrastructure,
26redevelopment, construction and other
27costs related to construction of
28educational facility in Carbon County

 

29Project Allocation

4,800,000

30(Base Project Allocation - $4,800,000)

 

1(B) Construction, site development,
2infrastructure and other costs related
3to construction of educational
4facility for Lehigh Carbon Community
5College

 

6Project Allocation

4,000,000

7(Base Project Allocation - $4,000,000)

 

8(C) Construction, infrastructure and
9other related costs for Blue Mountain
10Health Systems renovation projects at
11Palmerton Hospital and Gnaden Huetten
12Memorial Hospital campuses

 

13Project Allocation

1,000,000

14(Base Project Allocation - $1,000,000)

 

15(D) Acquisition, construction,
16infrastructure, redevelopment,
17renovations and other costs associated
18with an economic development project
19in the county

 

20Project Allocation

7,500,000

21(Base Project Allocation - $7,500,000)

 

<-22(ii) Nesquehoning Borough

 

23(A) Construction, renovation and other
24related costs for expansion of Carbon
25County Correctional Facility

 

26Project Allocation

1,500,000

27(Base Project Allocation - $1,500,000)

 

28(14) Centre County

 

29(i) County projects

 

30(A) Acquisition, infrastructure,

 

1construction and other related costs
2for wildlife education center

 

3Project Allocation

3,000,000

4(Base Project Allocation - $3,000,000)

 

5(B) Acquisition, infrastructure,
6construction and other related costs
7for development of expanded natural
8gas services

 

9Project Allocation

5,000,000

10(Base Project Allocation - $5,000,000)

 

11(C) Acquisition, infrastructure,
12construction and other related costs
13for rehabilitation and expansion of
14Memorial Field and Central Parklet,
15located in State College Borough

 

16Project Allocation

8,000,000

17(Base Project Allocation - $8,000,000)

 

18(D) Acquisition, infrastructure,
19construction and other related costs
20for centralized, all-inclusive YMCA
21multisports facility

 

22Project Allocation

10,000,000

23(Base Project Allocation -
24$10,000,000)

 

<-25(E) Construction, infrastructure,
26acquisition and other related costs
27for development of natural gas
28services

 

29Project Allocation

5,000,000

30(Base Project Allocation - $5,000,000)

 

1(F) Construction, rehabilitation, site
2upgrades, connector road to Penn Eagle
3Industrial Park, loading equipment,
4building upgrades, access system and
5other related costs for development of
6a centralized transloading site at
7Titan Energy Park

 

8Project Allocation

5,000,000

9(Base Project Allocation - $5,000,000)

 

10(G) Acquisition, construction,
11infrastructure and other related costs
12for development of natural gas
13services

 

14Project Allocation

5,000,000

15(Base Project Allocation - $5,000,000)

 

16(ii) Moshannon Valley Economic Development
17Partnership

 

18(A) Acquisition, infrastructure,
19construction and other related costs
20for medical building in medically
21underserved area

 

22Project Allocation

2,000,000

23(Base Project Allocation - $2,000,000)

 

<-24(iii) Geisinger Authority

 

25(A) Construction, infrastructure,
26redevelopment, renovation and other
27related costs for expanded access to
28primary and specialty care project

 

29Project Allocation

3,000,000

30(Base Project Allocation - $3,000,000)

 

<-1(iii.1) Bellefonte Borough

 

2(A) Redevelopment of downtown area in
3Bellefonte Borough, including
4construction and related
5infrastructure

 

6Project Allocation

5,000,000

7(Base Project Allocation - $5,000,000)

 

8(iv) Centre Hall Borough/Potter Township

 

9(A) Construction, infrastructure and
10other related costs for new fire hall

 

11Project Allocation

2,500,000

12(Base Project Allocation - $2,500,000)

 

13(v) College Township

 

14(A) Construction, infrastructure and
15other related costs for development of
16compressed natural gas fueling station
17for Centre County Recycling and Refuse
18Authority operations

 

19Project Allocation

500,000

20(Base Project Allocation - $500,000)

 

21(vi) State College Borough

 

22(A) Construction, infrastructure and
23other related costs for mixed-use
24development, including retail, hotel,
25residential and parking

 

26Project Allocation

5,000,000

27(Base Project Allocation - $5,000,000)

 

28(15) Chester County

 

29(i) County projects

 

30(A) Acquisition, infrastructure,

 

1renovations and other related costs
2for improvement to park facilities

 

3Project Allocation

5,000,000

4(Base Project Allocation - $5,000,000)

 

5(B) Acquisition, infrastructure,
6renovations, rehabilitation and other
7related costs for community
8revitalization projects

 

9Project Allocation

5,000,000

10(Base Project Allocation - $5,000,000)

 

11(C) Acquisition, infrastructure,
12renovations, rehabilitation and other
13related costs for economic development
14projects

 

15Project Allocation

5,000,000

16(Base Project Allocation - $5,000,000)

 

17(D) Construction, infrastructure and
18other related costs for Valley Forge
19Christian College Athletic Facilities
20expansion project

 

21Project Allocation

2,000,000

22(Base Project Allocation - $2,000,000)

 

23(E) Construction, infrastructure and
24other related costs for renovation of
25existing Technical High School
26Pickering Campus

 

27Project Allocation

2,400,000

28(Base Project Allocation - $2,400,000)

 

29(ii) Chester County Economic Development
30Council

 

1(A) Acquisition, infrastructure,
2construction, streetscape
3improvements, industrial and
4commercial site development and other
5capital revitalization in Borough of
6Kennett Square

 

7Project Allocation

10,000,000

8(Base Project Allocation -
9$10,000,000)

 

10(B) Acquisition, infrastructure,
11construction, commercial development
12and other related costs for Route 1
13corridor in southern Chester County

 

14Project Allocation

15,000,000

15(Base Project Allocation -
16$15,000,000)

 

17(iii) Chester County Industrial Development
18Authority

 

<-19(A) Acquisition, infrastructure,
20construction and other related costs
21for development of commercial center
22in East Brandywine Township

 

23Project Allocation

2,500,000

24(Base Project Allocation - $2,500,000)

 

<-25(B) (A) Acquisition, demolition,
26infrastructure, construction and other
27related costs, including abatement of
28hazardous materials, for multisite,
29transit-oriented redevelopment project
30in City of Coatesville. Redevelopment

 

1to include reconstruction of
2infrastructure, renovation of historic
3facilities and new construction

 

4Project Allocation

10,000,000

5(Base Project Allocation -
6$10,000,000)

 

<-7(C) (B) Acquisition, construction,
8infrastructure and other related costs
9for renovation of historical cultural
10center

 

11Project Allocation

1,000,000

12(Base Project Allocation - $1,000,000)

 

<-13(C) Construction, infrastructure,
14redevelopment, site preparation,
15demolition and other related costs to
16support redevelopment of Devault
17Quarry

 

18Project Allocation

8,000,000

19(Base Project Allocation - $8,000,000)

 

20(D) Acquisition, site preparation,
21infrastructure, demolition and
22construction costs to support
23redevelopment of two previously
24utilized sites for commercial
25development project in West Goshen
26Township

 

27Project Allocation

1,000,000

28(Base Project Allocation - $1,000,000)

 

29(E) Acquisition, site preparation,
30infrastructure and construction costs

 

1to support construction of grocery-
2anchored, 65,000-square-foot
3commercial center and placement of
4significant new infrastructure in East
5Brandywine Township

 

6Project Allocation

2,500,000

7(Base Project Allocation - $2,500,000)

 

8(iii.1) Downingtown Borough

 

9(A) Construction, infrastructure,
10acquisition and related costs for
11development and expansion of
12Downingtown Transportation Center

 

13Project Allocation

5,000,000

14(Base Project Allocation - $5,000,000)

 

<-15(iii.2) Easttown Township

 

16(A) Construction, renovation, demolition,
17abatement of hazardous materials and
18other related costs for fire company
19apparatus building

 

20Project Allocation

4,000,000

21(Base Project Allocation - $4,000,000)

 

22(iv) East Whiteland Township

 

23(A) Construction, infrastructure
24improvements and other costs related
25to People's Theatre Phase III
26expansion project

 

27Project Allocation

1,000,000

28(Base Project Allocation - $1,000,000)

 

29(B) Construction, infrastructure
30improvements and other costs related

 

1to Immaculata University building
2projects

 

3Project Allocation

8,000,000

4(Base Project Allocation - $8,000,000)

 

5(v) Malvern Borough

 

6(A) Construction, infrastructure,
7acquisition and related costs
8associated with reuse and development
9projects

 

10Project Allocation

5,000,000

11(Base Project Allocation - $5,000,000)

 

12(vi) Phoenixville Borough

 

13(A) Construction, infrastructure
14improvements and other costs related
15to Colonial Theatre expansion project

 

16Project Allocation

4,000,000

17(Base Project Allocation - $4,000,000)

 

18(B) Mixed-use development, including
19construction, infrastructure,
20acquisition and related costs at
21former Phoenix Steel site

 

22Project Allocation

5,000,000

23(Base Project Allocation - $5,000,000)

 

<-24(C) Construction, acquisition,
25infrastructure, redevelopment and
26other related costs for parking garage
27and reconstruction of transit service
28trestle bridge

 

29Project Allocation

2,000,000

30(Base Project Allocation - $2,000,000)

 

1(D) Construction, renovation and other
2related costs for upgrades to Reeves
3Park, including renovations to
4historic memorials and Civil War-era
5display

 

6Project Allocation

750,000

7(Base Project Allocation - $750,000)

 

8(vi.1) Schuylkill Township

 

9(A) Construction and other related costs
10for renovations to municipal complex,
11including police indoor shooting
12range, installation of geothermal and
13solar and new outbuilding

 

14Project Allocation

1,250,000

15(Base Project Allocation - $1,250,000)

 

16(B) Construction, renovation, demolition,
17abatement of hazardous materials and
18other related costs for fire company
19apparatus

 

20Project Allocation

4,500,000

21(Base Project Allocation - $4,500,000)

 

22(vii) Upper Uwchlan Township

 

23(A) Construction, infrastructure and
24other related costs for roadway
25reconstruction, landscaping and
26streetscape improvements to
27Pennsylvania Drive and Stockton Drive,
28located within Hankin's Eagleview

 

29Project Allocation

700,000

30(Base Project Allocation - $700,000)

 

1(B) Construction and other related costs
2for renovations and rehabilitation of
3barn located in Upland Farms Park, to
4be utilized as local community center

 

5Project Allocation

910,000

6(Base Project Allocation - $910,000)

 

7(viii) Uwchlan Township

 

8(A) Construction, infrastructure and
9other related costs for improvement
10and expansion of Eagleview complex

 

11Project Allocation

10,000,000

12(Base Project Allocation -
13$10,000,000)

 

14(B) Construction, infrastructure and
15other related costs for improvement
16and expansion of Innovation Center at
17Eagleview

 

18Project Allocation

2,000,000

19(Base Project Allocation - $2,000,000)

 

20(ix) West Chester Borough

 

21(A) Acquisition, construction,
22infrastructure and other related costs
23for Borough of West Chester multiuse
24theater project

 

25Project Allocation

500,000

26(Base Project Allocation - $500,000)

 

27(B) Acquisition, construction,
28infrastructure and other related costs
29for West Chester Borough redevelopment
30projects

 

1Project Allocation

7,000,000

2(Base Project Allocation - $7,000,000)

 

3(C) Acquisition, construction,
4infrastructure and other related costs
5for former biopharma site
6redevelopment projects

 

7Project Allocation

2,500,000

8(Base Project Allocation - $2,500,000)

 

9(16) Clarion County

 

10(i) (Reserved)

 

<-11(ii) Monroe Township

 

12(A) Acquisition, infrastructure,
13construction and other related costs
14for assisted living senior community

 

15Project Allocation

1,000,000

16(Base Project Allocation - $1,000,000)

 

17(B) Acquisition, construction,
18infrastructure and other related costs
19for YMCA health and wellness center

 

20Project Allocation

3,000,000

21(Base Project Allocation - $3,000,000)

 

22(17) Clearfield County

 

23(i) County projects

 

24(A) Acquisition, infrastructure,
25construction and other related costs
26for economic project

 

27Project Allocation

10,000,000

28(Base Project Allocation -
29$10,000,000)

 

30(ii) Moshannon Valley Economic Development

 

1Partnership

 

2(A) Acquisition, infrastructure,
3construction and other related costs
4for medical building in medically
5underserved area

 

6Project Allocation

2,000,000

7(Base Project Allocation - $2,000,000)

 

8(iii) Bloom Township

<-

9(A) Construction, infrastructure and
10other related costs for the
11development of regional trans loading
12facility at Falls Creek location of
13Russell Stone Products

 

14Project Allocation

1,400,000

15(Base Project Allocation - $1,400,000)

 

16(iii) City of DuBois

<-

17(iv) City of DuBois

<-

18(A) Infrastructure, construction and
19other related costs for expansion of
20existing medical arts building at
21DuBois Regional Medical Center

 

22Project Allocation

7,500,000

23(Base Project Allocation - $7,500,000)

 

24(18) Clinton County

 

25(i) County projects

 

26(A) Acquisition, infrastructure,
27construction and other related costs
28for economic project

 

29Project Allocation

10,000,000

30(Base Project Allocation -

 

1$10,000,000)

 

<-2(B) Acquisition, construction, facility
3improvements, machinery and equipment
4costs related to renovation and
5expansion with Jersey Shore Steel

 

6Project Allocation

2,500,000

7(Base Project Allocation - $2,500,000)

 

<-8(ii) Lock Haven

 

9(A) Construction, infrastructure and
10other related costs for broadband
11fiber and wireless communications
12project

 

13Project Allocation

1,500,000

14(Base Project Allocation - $1,500,000)

 

15(B) Construction and other related costs
16for renovation of office building <-at 
17Lock Haven University

 

18Project Allocation

5,000,000

19(Base Project Allocation - $5,000,000)

 

20(ii) <-(iii) Wayne Township

 

21(A) Acquisition, construction and related
22infrastructure for a mulch recycling
23facility

 

24Project Allocation

750,000

25(Base Project Allocation - $750,000)

 

26(B) Demolition, construction and related
27infrastructure to relocate weight
28scale and to construct scale house and
29roadway related to overall project

 

30Project Allocation

1,000,000

1(Base Project Allocation - $1,000,000)

 

2(C) Construction and infrastructure for a
3new administration building that will
4include educational facilities

 

5Project Allocation

2,500,000

6(Base Project Allocation - $2,500,000)

 

7(D) Construction and related
8infrastructure for compressed natural
9gas filling station for solid waste
10authority vehicles and public filling

 

11Project Allocation

1,000,000

12(Base Project Allocation - $1,000,000)

 

13(E) Acquisition, construction and related
14infrastructure for a vehicle
15maintenance shop for service of
16compressed natural gas vehicles

 

17Project Allocation

750,000

18(Base Project Allocation - $750,000)

 

19(F) Construction and related
20infrastructure for facilities to
21collect and process landfill gas into
22compressed natural gas

 

23Project Allocation

1,500,000

24(Base Project Allocation - $1,500,000)

 

25(19) Columbia County

 

<-26(i) (Reserved)

 

<-27(i) County projects

 

28(A) Renovations and upgrades to Ber
29Vaughn Park swimming pool complex

 

30Project Allocation

2,750,000

1(Base Project Allocation - $2,750,000)

 

2(20) Crawford County

 

3(i) County projects

 

4(A) Acquisition, infrastructure, and
5construction of trail segments
6advancing Erie-to-Pittsburgh trail
7corridor and closing existing gaps

 

8Project Allocation

1,000,000

9(Base Project Allocation - $1,000,000)

 

10(B) Acquisition, infrastructure,
11construction and renovations of
12existing or needed infrastructure
13promoting economic development

 

14Project Allocation

2,000,000

15(Base Project Allocation - $2,000,000)

 

16(ii) Conneaut Valley Economic and Industrial
17Development Authority

 

18(A) Acquisition, rehabilitation,
19construction and other related costs,
20including abatement of hazardous
21materials, for regional economic
22development project in downtown
23Conneautville Borough

 

24Project Allocation

1,500,000

25(Base Project Allocation - $1,500,000)

 

26(iii) Economic Progress Alliance of Crawford
27County

 

28(A) Acquisition, infrastructure
29improvements, site planning,
30renovation, remediation, construction

 

1and other related costs for continued
2development of Linesville Business
3Park

 

4Project Allocation

1,000,000

5(Base Project Allocation - $1,000,000)

 

6(B) Acquisition, infrastructure
7improvements, site planning,
8renovation, remediation, construction
9and other related costs for continued
10development of Bessemer Street in City
11of Meadville

 

12Project Allocation

1,000,000

13(Base Project Allocation - $1,000,000)

 

14(C) Acquisition, infrastructure
15improvements, site planning,
16renovation, remediation, construction
17and other related costs for continued
18development of Crawford Woodlands in
19Vernon Township

 

20Project Allocation

2,000,000

21(Base Project Allocation - $2,000,000)

 

22(D) Acquisition, infrastructure,
23construction and other related costs
24for redevelopment and expansion of
25Meadville Medical Center

 

26Project Allocation

25,000,000

27(Base Project Allocation -
28$25,000,000)

 

29(iv) Redevelopment Authority of the City of
30Meadville

 

1(A) Acquisition, infrastructure,
2construction and other related costs
3for renovations and redevelopment of
4various land parcels and commercial
5properties located within City of
6Meadville

 

7Project Allocation

2,500,000

8(Base Project Allocation - $2,500,000)

 

9(B) Construction, infrastructure and
10other related costs for renovation of
11Bentley Hall at Allegheny College

 

12Project Allocation

10,000,000

13(Base Project Allocation -
14$10,000,000)

 

15(v) Titusville Redevelopment Authority

 

16(A) Infrastructure, construction and
17redevelopment of properties along
18Titusville portion of Erie-to-
19Pittsburgh trail

 

20Project Allocation

500,000

21(Base Project Allocation - $500,000)

 

22(B) Acquisition, rehabilitation,
23construction and other related costs,
24including abatement of hazardous
25materials, for redevelopment of
26blighted properties located within
27City of Titusville

 

28Project Allocation

1,000,000

29(Base Project Allocation - $1,000,000)

 

30(C) Infrastructure, renovation and

 

1redevelopment of several steel mill
2buildings for conversion into
3multitenant industrial building

 

4Project Allocation

1,500,000

5(Base Project Allocation - $1,500,000)

 

6(D) Infrastructure and other related
7costs for construction of five light
8manufacturing incubators, including
9new buildings, loading docks, rail
10spur and rail sidings

 

11Project Allocation

2,000,000

12(Base Project Allocation - $2,000,000)

 

<-13(vi) Conneaut Lake Borough

 

14(A) Construction, infrastructure,
15redevelopment and other related costs
16for revitalization of downtown
17business district

 

18Project Allocation

4,000,000

19(Base Project Allocation - $4,000,000)

 

20(21) Cumberland County

 

<-21(i) (Reserved)

 

<-22(i.1) (ii) Camp Hill Borough

 

23(A) Land acquisition, construction,
24infrastructure improvement, renovation
25and other related costs for expansion
26of Holy Spirit Health System
27facilities

 

28Project Allocation

5,000,000

29(Base Project Allocation - $5,000,000)

 

<-30(i.2) (iii) East Pennsboro Township

 

1(A) Land acquisition, infrastructure
2improvements, demolition, site
3improvement, renovation, addition,
4utility expansion, construction,
5purchase of medically necessary
6fixtures and other related costs for
7hospital and other related facilities
8of Holy Spirit Health System

 

9Project Allocation

3,500,000

10(Base Project Allocation - $3,500,000)

 

<-11(i.3) (iv) Hampden Township

 

12(A) Construction, acquisition,
13infrastructure, redevelopment and
14other related costs for PinnacleHealth
15West Shore Campus

 

16Project Allocation

10,000,000

17(Base Project Allocation -
18$10,000,000)

 

<-19(B) Acquisition, infrastructure,
20construction, redevelopment and other
21related costs for PinnacleHealth
22Community Campus

 

23Project Allocation

10,000,000

24(Base Project Allocation -
25$10,000,000)

 

<-26(i.4) (v) Hampden Township

 

27(A) Purchase, renovation and other
28related costs for community homes by
29Keystone Human Services to support
30persons with intellectual disabilities

 

1Project Allocation

3,740,000

2(Base Project Allocation - $3,740,000)

 

<-3(vi) Borough of Lemoyne

 

4(A) Construction, infrastructure and
5other related costs for new fire
6station

 

7Project Allocation

1,500,000

8(Base Project Allocation - $1,500,000)

 

9(i) <-(i.5) (vii) Borough of Shippensburg

 

10(A) Acquisition, infrastructure,
11construction and other costs related
12to Dykeman Road extension project
13located within industrial park

 

14Project Allocation

2,500,000

15(Base Project Allocation - $2,500,000)

 

16(B) Renovations, redevelopment and other
17related costs for design, construction
18and development of community center

 

19Project Allocation

1,000,000

20(Base Project Allocation - $1,000,000)

 

<-21(ii) (viii) Silver Spring Township

 

22(A) Land acquisition, infrastructure
23improvements, environmental
24remediation, construction and other
25related costs for community
26recreational facilities

 

27Project Allocation

3,000,000

28(Base Project Allocation - $3,000,000)

 

<-29(B) Purchase, renovation and other
30related costs for community homes by

 

1Keystone Human Services to support
2persons with intellectual disabilities

 

3Project Allocation

3,740,000

4(Base Project Allocation - $3,740,000)

 

5(iii) (ix)<- South Middleton Township

 

6(A) Construction and other related costs
7for new dining facility and
8improvements to existing buildings
9that are part of Diakon Wilderness
10Center

 

11Project Allocation

2,000,000

12(Base Project Allocation - $2,000,000)

 

<-13(x) Wormleysburg Borough

 

14(A) Construction, infrastructure and
15other costs related to the expansion
16of Early Childhood Center at
17Harrisburg Academy

 

18Project Allocation

2,000,000

19(Base Project Allocation - $2,000,000)

 

20(22) Dauphin County

 

21(i) County projects

 

22(A) Construction and other related costs
23for improvement of infrastructure in
24City of Harrisburg and other
25surrounding communities

 

26Project Allocation

24,000,000

27(Base Project Allocation -
28$24,000,000)

 

29(B) Acquisition, construction,
30infrastructure and other related costs

 

1for Union House Apartment adaptive
2reuse project

 

3Project Allocation

1,000,000

4(Base Project Allocation - $1,000,000)

 

5(C) Construction and infrastructure
6improvements for Jewish Federation of 
7Greater Harrisburg facility

 

8Project Allocation

1,100,000

9(Base Project Allocation - $1,100,000)

 

<-10(D) Acquisition, construction and related
11infrastructure for facility to provide
12training for multidisciplinary
13investigative teams and other
14individuals in area of child
15protective services

 

16Project Allocation

3,500,000

17(Base Project Allocation - $3,500,000)

 

<-18(E) Construction of firearm manufacturing
19facility to be located within ten
20miles of Harrisburg International
21Airport (HIA)

 

22Project Allocation

38,000,000

23(Base Project Allocation -
24$38,000,000)

 

25(ii) City of Harrisburg

 

26(A) Acquisition, construction,
27infrastructure and other related costs
28for Greenwood Business Center
29incubator project

 

30Project Allocation

1,500,000

1(Base Project Allocation - $1,500,000)

 

<-2(B) Construction, renovation,
3rehabilitation, redevelopment,
4infrastructure improvement and other
5related costs at Harrisburg Resource
6Recovery Facility

 

7Project Allocation

8,000,000

8(Base Project Allocation - $8,000,000)

 

9(C) Acquisition, construction,
10infrastructure, redevelopment,
11abatement of hazardous materials and
12other related costs for construction
13of art and athletic facility

 

14Project Allocation

2,000,000

15(Base Project Allocation - $2,000,000)

 

16(D) Acquisition, construction,
17infrastructure and other related costs
18for redevelopment projects

 

19Project Allocation

20,000,000

20(Base Project Allocation -
21$20,000,000)

 

22(E) Acquisition, construction and other
23related costs for PinnacleHealth
24campus improvements and expansion

 

25Project Allocation

10,000,000

26(Base Project Allocation -
27$10,000,000)

 

28(F) Acquisition, renovation,
29infrastructure and other related costs
30for site development and improvements,

 

1including structural improvements, for
2at-risk youth through renovation of
3Joshua Learning Center

 

4Project Allocation

1,000,000

5(Base Project Allocation - $1,000,000)

 

<-6(G) Acquisition, construction,
7infrastructure, redevelopment and
8other related costs for a Salvation
9Army Corps Community Center on Paxton
10Street

 

11Project Allocation

6,000,000

12(Base Project Allocation - $6,000,000)

 

13(iii) Derry Township

 

14(A) Acquisition, construction,
15infrastructure and other related costs
16for Vista Foundation Autism Spectrum
17Disorder project

 

18Project Allocation

350,000

19(Base Project Allocation - $350,000)

 

<-20(iii.1) East Hanover Township

 

21(A) Purchase, renovation and other
22related costs for community homes by
23Keystone Human Services to support
24persons with intellectual disabilities

 

25Project Allocation

3,740,000

26(Base Project Allocation - $3,740,000)

 

27(iv) Londonderry Township

 

28(A) Construction, infrastructure and
29other related costs for water service
30infrastructure for commercial and

 

1industrial projects

 

2Project Allocation

1,000,000

3(Base Project Allocation - $1,000,000)

 

<-4(iv.1) Lower Paxton Township

 

5(A) Construction, infrastructure and
6other related costs for recreation
7facility on Bishop McDevitt High
8School campus on Spring Creek Road

 

9Project Allocation

725,000

10(Base Project Allocation - $725,000)

 

11(B) Purchase, renovation and other
12related costs for community homes by
13Keystone Human Services to support
14persons with intellectual disabilities

 

15Project Allocation

3,740,000

16(Base Project Allocation - $3,740,000)

 

<-17(C) Acquisition, infrastructure,
18construction, redevelopment and other
19related costs for PinnacleHealth
20Community Campus

 

21Project Allocation

10,000,000

22(Base Project Allocation -
23$10,000,000)

 

24(iv.2) Middle Paxton Township

 

25(A) Construction, infrastructure,
26redevelopment and other related costs
27for renovation and expansion of YWCA's
28Camp Reily

 

29Project Allocation

3,000,000

30(Base Project Allocation - $3,000,000)

 

<-1(iv.3) South Hanover Township

 

2(A) Acquisition, construction,
3infrastructure and other related costs
4for municipal complex and emergency
5services facility

 

6Project Allocation

2,500,000<-

7(Base Project Allocation - $2,500,000)

 

8(v) Swatara Township

 

9(A) Acquisition, construction,
10infrastructure and other related costs
11for Swatara Gardens senior housing
12project

 

13Project Allocation

1,000,000

14(Base Project Allocation - $1,000,000)

 

<-15(v.1) Susquehanna Township

 

16(A) Purchase, renovation and other
17related costs for community homes by
18Keystone Human Services to support
19persons with intellectual disabilities

 

20Project Allocation

3,740,000

21(Base Project Allocation - $3,740,000)

 

22(23) Delaware County

 

23(i) County projects

 

24(A) Acquisition, infrastructure,
25construction and other related costs
26for commercial development of housing,
27retail and other mixed uses at Widener
28University

 

29Project Allocation

2,000,000

30(Base Project Allocation - $2,000,000)

 

1(B) Delaware County Housing Authority,
2acquisition, infrastructure,
3redevelopment, construction, abatement
4of hazardous materials and other
5related costs for development of
6properties in Ridley Township and
7Nether Providence Township

 

8Project Allocation

1,500,000

9(Base Project Allocation - $1,500,000)

 

<-10(C) Construction, renovations and other
11costs related to conversion and
12upgrade of all patient rooms to
13private rooms at Delaware County
14Memorial Hospital

 

15Project Allocation

4,000,000

16(Base Project Allocation - $4,000,000)

 

17(i.1) Chester Economic Development Authority

 

18(A) Construction, expansion,
19infrastructure improvements,
20environmental remediation,
21rehabilitation, renovation and other
22related costs for the completion of
23Phase II for sports and entertainment
24complex on Chester waterfront

 

25Project Allocation

15,000,000

26(Base Project Allocation -
27$15,000,000)

 

28(i.2) Delaware County Commerce Center

 

29(A) Acquisition, infrastructure,
30rehabilitation, construction and other

 

1related costs for entertainment, hotel
2and special events facility

 

3Project Allocation

12,500,000

4(Base Project Allocation -
5$12,500,000)

 

<-6(B) Construction, infrastructure,
7renovation and other related costs for
8alternative energy facility utilizing
9plasma technologies

 

10Project Allocation

3,000,000

11(Base Project Allocation - $3,000,000)

 

12(ii) Delaware County Industrial Development
13Authority

 

14(A) Infrastructure, construction and
15other related costs for revitalization
16of former Sears site

 

17Project Allocation

4,200,000

18(Base Project Allocation - $4,200,000)

 

19(B) Infrastructure, construction, public
20utility upgrades and other related
21costs for Chadds Ford redevelopment
22project

 

23Project Allocation

5,000,000

24(Base Project Allocation - $5,000,000)

 

25(C) Acquisition, site preparation,
26infrastructure and construction costs
27related to mixed-use redevelopment
28project to be located adjacent to
29Cardinal O'Hara High School

 

30Project Allocation

20,000,000

1(Base Project Allocation -
2$20,000,000)

 

<-3(D) Acquisition, site preparation,
4construction, infrastructure,
5abatement of hazardous materials and
6other related costs to support Pond's
7Edge redevelopment project in
8Middletown Township

 

9Project Allocation

5,000,000

10(Base Project Allocation - $5,000,000)

 

<-11(E) Construction, infrastructure and
12other related costs for the
13redevelopment of former Lyondell
14building in Newtown Township

 

15Project Allocation

5,798,000

16(Base Project Allocation - $5,798,000)

 

17(iii) Delaware County Redevelopment Authority

 

18(A) Site preparation, installation of
19public utilities and related
20facilities, construction and
21installation of sidewalks and fencing
22and other related costs for
23multipurpose athletic facility at
24Cardinal O'Hara High School

 

25Project Allocation

300,000

26(Base Project Allocation - $300,000)

 

27(B) Infrastructure, renovations,
28construction and other related costs
29for rehabilitation of former school
30building to accommodate day program

 

1services

 

2Project Allocation

500,000

3(Base Project Allocation - $500,000)

 

4(C) Acquisition, infrastructure,
5construction and other related costs
6for development of integrated
7ambulatory center for Mercy Health
8System to provide expanded access to
9primary care, specialty care and
10diagnostic services

 

11Project Allocation

1,750,000

12(Base Project Allocation - $1,750,000)

 

13(D) Infrastructure, construction,
14renovation and other related costs for
15expansion of Neumann University's
16Bruder Student Life Center

 

17Project Allocation

3,000,000

18(Base Project Allocation - $3,000,000)

 

19(E) Acquisition, design, infrastructure,
20construction, renovation and other
21related costs for construction of
22safety cross-over bridge project,
23connecting Neumann University's main
24campus to student center and residence
25housing

 

26Project Allocation

3,000,000

27(Base Project Allocation - $3,000,000)

 

28(F) Acquisition, infrastructure,
29construction and other related costs
30for rehabilitation and renovation of

 

1the historic Deshong Museum and
2mansion

 

3Project Allocation

5,000,000

4(Base Project Allocation - $5,000,000)

 

5(G) Acquisition, design, infrastructure,
6construction and other related costs
7for access ramp, within Crozer-Chester
8Medical Center, to allow for ingress
9and regress

 

10Project Allocation

10,000,000

11(Base Project Allocation -
12$10,000,000)

 

13(H) Acquisition, infrastructure,
14redevelopment, construction, abatement
15of hazardous materials and other
16related costs for redevelopment of
17properties in Penn Hills area of
18Ridley Township

 

19Project Allocation

2,500,000

20(Base Project Allocation - $2,500,000)

 

21(I) Land acquisition, infrastructure
22improvements, demolition, site
23improvement, renovation, addition,
24utility expansion and other related
25costs for hospital and related
26facilities of main line health system

 

27Project Allocation

10,000,000

28(Base Project Allocation -
29$10,000,000)

 

<-30(J) Redevelopment, construction,

 

1demolition, infrastructure and other
2related costs for commercial and
3retail development of Upper Darby 69th
4Street corridor

 

5Project Allocation

7,500,000

6(Base Project Allocation - $7,500,000)

 

7(K) Redevelopment, construction,
8infrastructure and other related costs
9for commercial development of Primos
10Film and Video Studios

 

11Project Allocation

1,000,000

12(Base Project Allocation - $1,000,000)

 

<-13(L) Construction, infrastructure and
14other related costs for new on-campus
15student housing, limited university-
16operated and student-centric retail,
17performing arts center, pedestrian
18bridge over Route 30 and parking
19improvements, including a 1,230-care
20parking structure for Villanova
21University in Radnor Township

 

22Project Allocation

10,000,000

23(Base Project Allocation -
24$10,000,000)

 

25(M) Construction, acquisition, railroad
26infrastructure, including support
27facilities, and related costs for
28economic development project

 

29Project Allocation

10,000,000

30(Base Project Allocation -

 

1$10,000,000)

 

2(iv) City of Chester

 

3(A) Acquisition, infrastructure,
4construction and other related costs
5for renovation and rehabilitation of
6historic 1724 Old Chester Courthouse
7and courtyard

 

8Project Allocation

3,000,000

9(Base Project Allocation - $3,000,000)

 

<-10(B) Acquisition, construction,
11infrastructure, redevelopment and
12other related costs for mixed-use
13redevelopment in downtown central
14business district and surrounding
15neighborhoods

 

16Project Allocation

10,000,000

17(Base Project Allocation -
18$10,000,000)

 

19(C) Acquisition, construction,
20infrastructure, redevelopment and
21other related costs for parking
22projects in downtown central business
23area and surrounding areas

 

24Project Allocation

15,000,000

25(Base Project Allocation -
26$15,000,000)

 

27(D) Acquisition, construction,
28infrastructure, redevelopment and
29other related costs for waterfront
30redevelopment

 

1Project Allocation

15,000,000

2(Base Project Allocation -
3$15,000,000)

 

4(E) Acquisition, construction,
5infrastructure, redevelopment and
6other related costs for redevelopment
7of downtown central business district
8and surrounding neighborhoods

 

9Project Allocation

20,000,000

10(Base Project Allocation -
11$20,000,000)

 

12(F) Acquisition, construction,
13infrastructure, redevelopment and
14other related costs for redevelopment
15projects

 

16Project Allocation

10,000,000

17(Base Project Allocation -
18$10,000,000)

 

<-19(iv.1) Chester Township

 

20(A) Construction and other related costs
21for fire station

 

22Project Allocation

1,000,000

23(Base Project Allocation - $1,000,000)

 

24(v) Borough of Eddystone

 

25(A) Acquisition, infrastructure,
26construction and other related costs
27for renovation and rehabilitation of
28Eddystone Fire House and Evacuation
29Center

 

30Project Allocation

1,000,000

1(Base Project Allocation - $1,000,000)

 

<-2(vi) Glenolden Borough

 

3(A) Acquisition, construction and other
4related costs for recreational fields,
5maintenance facility and walking
6trails

 

7Project Allocation

500,000

8(Base Project Allocation - $500,000)

 

<-9(vi.1) Haverford Township

 

10(A) Construction, redevelopment,
11infrastructure and other related costs
12for a municipal services building

 

13Project Allocation

9,000,000

14(Base Project Allocation - $9,000,000)

 

15(B) Construction, redevelopment,
16infrastructure and other related costs
17for a combined police, EMS, township
18administration and other municipal
19services facility

 

20Project Allocation

3,000,000

21(Base Project Allocation - $3,000,000)

 

22(vii) Marple Township

 

23(A) Construction, infrastructure and
24other related costs for new Municipal
25Police Station and Magisterial
26District Court

 

27Project Allocation

4,100,000

28(Base Project Allocation - $4,100,000)

 

29(B) Construction, infrastructure,
30rehabilitation, renovation and other

 

1related costs for Marple Township
2Municipal and Library Building

 

3Project Allocation

654,000

4(Base Project Allocation - $654,000)

 

5(C) Site preparation, infrastructure,
6construction and other related costs
7to support the development of new
8facility for Broomall Fire Company

 

9Project Allocation

3,250,000

10(Base Project Allocation - $3,250,000)

 

11(viii) Borough of Media

 

12(A) Construction, infrastructure,
13renovation, redevelopment and other
14related costs for Media-Upper
15Providence Free Library

 

16Project Allocation

750,000

17(Base Project Allocation - $750,000)

 

18(viii.1) Millbourne Borough

 

19(A) Construction, infrastructure and
20other related costs for redevelopment
21of former Sears site

 

22Project Allocation

4,200,000

23(Base Project Allocation - $4,200,000)

 

24(ix) Morton Borough

 

25(A) Construction, renovation and other
26related costs for improvements to
27municipal building, including police
28station, borough offices and community
29facilities

 

30Project Allocation

500,000

1(Base Project Allocation - $500,000)

 

2(x) Newtown Township

 

3(A) Acquisition, construction,
4infrastructure, redevelopment and
5other related costs for municipal and
6public safety facility

 

7Project Allocation

5,000,000

8(Base Project Allocation - $5,000,000)

 

9(xi) Norwood Borough

 

10(A) Construction and other related costs
11for new firehouse

 

12Project Allocation

500,000

13(Base Project Allocation - $500,000)

 

14(xii) Prospect Park Borough

 

15(A) Construction, redevelopment,
16rehabilitation and other related costs
17to revitalize a blighted
18business/civic district

 

19Project Allocation

800,000

20(Base Project Allocation - $800,000)

 

21(vi) <-(xiii) Radnor Township

 

22(A) Construction, renovation and
23rehabilitation of capital facilities,
24including infrastructure on campus of
25Cabrini College

 

26Project Allocation

10,000,000

27(Base Project Allocation -
28$10,000,000)

 

<-29(B) Construction, redevelopment and other
30related costs for projects relating to

 

1Creutzberg Center

 

2Project Allocation

1,050,000

3(Base Project Allocation - $1,050,000)

 

4(C) Construction, infrastructure and
5other related costs for projects in
6Fenimore Woods Park

 

7Project Allocation

700,000

8(Base Project Allocation - $700,000)

 

9(D) Construction, infrastructure,
10redevelopment and other related costs
11for projects relating to Radnor
12Township Building

 

13Project Allocation

500,000

14(Base Project Allocation - $500,000)

 

15(E) Upgrades and deferred maintenance,
16Phase VII, for north Wayne flood
17mitigation

 

18Project Allocation

550,000

19(Base Project Allocation - $550,000)

 

<-20(xiii.1) Ridley Park Borough

 

21(A) Infrastructure improvements,
22construction, relocation, renovation
23and other related costs for Taylor
24Hospital

 

25Project Allocation

4,000,000

26(Base Project Allocation - $4,000,000)

 

27(xiv) Sharon Hill Borough

 

28(A) Renovations, construction, energy
29efficiency upgrades and other related
30costs for Sharon Hill Borough fire

 

1department

 

2Project Allocation

500,000

3(Base Project Allocation - $500,000)

 

4(xv) Springfield Township

 

5(A) Rehabilitation, renovation,
6infrastructure and other related costs
7for improvements to two business
8districts

 

9Project Allocation

1,000,000

10(Base Project Allocation - $1,000,000)

 

11(B) Renovations and other related costs
12for ADA accessibility requirements and
13upgrade facilities used for township
14public safety and emergency operation
15activities

 

16Project Allocation

500,000

17(Base Project Allocation - $500,000)

 

18(C) Renovation, infrastructure and other
19related costs for township parks and
20recreation projects

 

21Project Allocation

1,000,000

22(Base Project Allocation - $1,000,000)

 

23(D) Construction, infrastructure and
24other related costs for development of
25full-service hotel facility

 

26Project Allocation

3,000,000

27(Base Project Allocation - $3,000,000)

 

28(E) Renovation, infrastructure and other
29related costs for township
30building/police station

 

1Project Allocation

2,500,000

2(Base Project Allocation - $2,500,000)

 

3(xvi) Tinicum Township

 

4(A) Construction, redevelopment,
5rehabilitation and other related costs
6for renovation of Lazaretto Quarantine
7Station for reuse as Tinicum Township
8Municipal Building

 

9Project Allocation

3,000,000

10(Base Project Allocation - $3,000,000)

 

<-11(xvii) Upland Borough

 

12(A) Upgrade central heat and cooling
13systems for Crozer-Keystone Health
14System, including construction,
15infrastructure and other related costs

 

16Project Allocation

8,000,000

17(Base Project Allocation - $8,000,000)

 

18(xvii)<- (xviii) Upper Providence Township

 

19(A) Construction, infrastructure and
20other related costs for new
21gymnasium/multipurpose building at
22Walden School and related site
23improvements

 

24Project Allocation

1,200,000

25(Base Project Allocation - $1,200,000)

 

26(24) Elk County

 

27(i) County projects

 

28(A) Acquisition, infrastructure,
29construction and other related costs
30for economic project

 

1Project Allocation

10,000,000

2(Base Project Allocation -
3$10,000,000)

 

4(ii) Elk County Redevelopment Authority

 

5(A) Acquisition, renovation,
6environmental remediation,
7construction and other related costs
8for rehabilitation of commercial
9buildings in Historic District of
10Ridgway Borough

 

11Project Allocation

4,000,000

12(Base Project Allocation - $4,000,000)

 

13(25) Erie County

 

14(i) County Projects

 

15(A) Acquisition, construction,
16infrastructure improvements and other
17costs related to the L2S-NMI-ERIE
18Medical Device Assembly Plant project

 

19Project Allocation

250,000

20(Base Project Allocation - $250,000)

 

<-21(B) Acquisition, construction,
22infrastructure, redevelopment and
23other related costs for Erie
24Metropolitan Transit Authority
25projects

 

26Project Allocation

2,500,000

27(Base Project Allocation - $2,500,000)

 

28(C) Acquisition, construction,
29infrastructure, redevelopment and
30other related costs for CNG fueling

 

1station projects of Erie Metropolitan
2Transit Authority

 

3Project Allocation

2,500,000

4(Base Project Allocation - $2,500,000)

 

5(ii) Boroughs of Albion and Crainesville;
6Conneaut and Elk Creek

 

7(A) Construct rail improvements and
8replace rail bridge at Erie Inland
9Port-Albion site

 

10Project Allocation

12,000,000

11(Base Project Allocation -
12$12,000,000)

 

13(iii) Corry Area Industrial Development
14Corporation

 

15(A) Acquisition, redevelopment and
16rehabilitation of vacant industrial
17facility to be converted to
18multitenant manufacturing facilities

 

19Project Allocation

2,500,000

20(Base Project Allocation - $2,500,000)

 

21(iv) Economic Development Corporation of Erie
22County

 

23(A) Infrastructure, construction,
24redevelopment and other related costs
25for improvement of former potato chip
26factory

 

27Project Allocation

1,000,000

28(Base Project Allocation - $1,000,000)

 

29(v) Erie City

 

30(A) Construction, infrastructure and

 

1other related costs for Stairways
2Behavioral Health neighborhood
3revitalization project

 

4Project Allocation

5,100,000

5(Base Project Allocation - $5,100,000)

 

6(B) Construct rail improvements and ship
7loading infrastructure at Port of Erie

 

8Project Allocation

9,000,000

9(Base Project Allocation - $9,000,000)

 

<-10(C) Construction, infrastructure and
11other related costs for building joint
12operations facility

 

13Project Allocation

3,000,000

14(Base Project Allocation - $3,000,000)

 

<-15(D) Construction, infrastructure and
16other related costs for a new academic
17building at Mercyhurst University

 

18Project Allocation

7,000,000

19(Base Project Allocation - $7,000,000)

 

20(v.1) Conneaut Township

 

21(A) Acquisition, construction and other
22related costs for development of
23multitenant industrial site as part of
24regional initiative called Erie Inland
25Port

 

26Project Allocation

8,075,000

27(Base Project Allocation - $8,075,000)

 

28(26) Fayette County

 

29(i) Bullskin Township

 

30(A) Construction, infrastructure and

 

1other costs related to Fay/West Soccer
2Complex indoor facility project

 

3Project Allocation

2,500,000

4(Base Project Allocation - $2,500,000)

 

5(ii) City of Uniontown

 

6(A) Acquisition, infrastructure,
7construction and other related costs
8for development of White Swan
9Apartments

 

10Project Allocation

750,000

11(Base Project Allocation - $750,000)

 

12(iii) Connellsville City

 

13(A) Construction, redevelopment,
14infrastructure and other related costs
15for the renovation of Behavioral
16Health Unit of Highlands Hospital

 

17Project Allocation

1,150,000

18(Base Project Allocation - $1,150,000)

 

19(27) Forest County

 

20(i) (Reserved)

 

21(28) Franklin County

 

22(i) Franklin County Redevelopment Authority

 

23(A) Acquisition, construction,
24infrastructure and other related costs
25for economic development project in
26the county

 

27Project Allocation

2,000,000

28(Base Project Allocation - $2,000,000)

 

29(B) Infrastructure, construction and
30other related costs for renovation and

 

1rehabilitation of John Steward
2Memorial Library on Wilson College
3campus

 

4Project Allocation

5,000,000

5(Base Project Allocation - $5,000,000)

 

6(C) Acquisition, infrastructure,
7construction and other related costs
8for redevelopment of former Scotland
9School for Veterans' Children campus,
10including construction of educational
11and other use facilities

 

12Project Allocation

7,500,000

13(Base Project Allocation - $7,500,000)

 

14(D) Acquisition, infrastructure,
15construction and other costs related
16to renovations and improvements at
17hospital facilities and entities in
18the county

 

19Project Allocation

15,000,000

20(Base Project Allocation -
21$15,000,000)

 

22(E) Infrastructure, construction,
23abatement of hazardous materials and
24other related costs for renovation of
25Prentis Hall on Wilson College Campus

 

26Project Allocation

10,000,000

27(Base Project Allocation -
28$10,000,000)

 

<-29(i.1) Franklin County Industrial Development
30Authority

 

1(A) Construction, acquisition, site
2preparation, infrastructure and
3related development costs for a high-
4tech industry office park and related
5uses in Letterkenny Township

 

6Project Allocation

7,000,000

7(Base Project Allocation - $7,000,000)

 

8(ii) Chambersburg Borough

 

9(A) Acquisition, infrastructure, design,
10engineering, renovations,
11rehabilitation, construction, utility
12relocation, traffic improvements,
13traffic signal upgrades and other
14related costs for upgrading municipal
15electric systems throughout this
16Commonwealth

 

17Project Allocation

7,000,000

18(Base Project Allocation - $7,000,000)

 

19(B) Acquisition, infrastructure, design,
20engineering, renovations,
21rehabilitation, construction, utility
22relocation, traffic improvements,
23traffic signal upgrades and other
24related costs for creating distributed
25natural gas generation facilities at
26municipal electric systems throughout
27this Commonwealth

 

28Project Allocation

7,000,000

29(Base Project Allocation - $7,000,000)

 

<-30(C) Purchase, renovation and other

 

1related costs for community homes by
2Keystone Human Services to support
3persons with intellectual disabilities

 

4Project Allocation

3,740,000

5(Base Project Allocation - $3,740,000)

 

6(iii) Borough of Shippensburg

 

7(A) Construction, rehabilitation and
8other related costs for improvements
9to Memorial Park Stadium

 

10Project Allocation

2,500,000

11(Base Project Allocation - $2,500,000)

 

12(iv) Borough of Waynesboro

 

13(A) Acquisition, construction,
14infrastructure and other related costs
15for economic development project in
16Borough of Waynesboro

 

17Project Allocation

2,000,000

18(Base Project Allocation - $2,000,000)

 

19(29) Fulton County

 

20(i) (Reserved)<-

 

<-21(i) County projects

 

22(A) Acquisition, construction,
23infrastructure and other related costs
24for rehabilitation of 8.5 miles of
25abandoned Pennsylvania Turnpike as a
26multiuse trail

 

27Project Allocation

4,000,000

28(Base Project Allocation - $4,000,000)

 

29(30) Greene County

 

30(i) Franklin Township

 

1(A) Acquisition, construction,
2infrastructure and other related costs
3for Greene County Airport commercial
4development project

 

5Project Allocation

2,500,000

6(Base Project Allocation - $2,500,000)

 

7(B) Acquisition, construction,
8infrastructure and other related costs
9for Waynesburg Crossings economic
10development project

 

11Project Allocation

2,000,000

12(Base Project Allocation - $2,000,000)

 

13(C) Acquisition, construction,
14infrastructure and other related costs
15for Franklin Township Business Park
16project

 

17Project Allocation

5,000,000

18(Base Project Allocation - $5,000,000)

 

<-19(D) Acquisition, construction, facility
20improvements, machinery and equipment
21costs related to renovation of Kyowa
22facility

 

23Project Allocation

2,000,000

24(Base Project Allocation - $2,000,000)

 

<-25(ii) Waynesburg Borough

 

26(A) Acquisition, construction,
27infrastructure, redevelopment and
28other related costs for academic
29building at Waynesburg University

 

30Project Allocation

7,000,000

1(Base Project Allocation - $7,000,000)

 

2(B) Acquisition, construction,
3infrastructure, redevelopment and
4other related costs for dormitory at
5Waynesburg University

 

6Project Allocation

3,500,000

7(Base Project Allocation - $3,500,000)

 

8(31) Huntingdon County

 

9(i) County projects

 

10(A) Acquisition, construction,
11infrastructure and other related costs
12for a Federally Qualified Health
13Center-anchored multiservice facility

 

14Project Allocation

3,000,000

15(Base Project Allocation - $3,000,000)

 

16(ii) Huntingdon County Business and Industry
17Incorporated

 

18(A) Acquisition, renovation, expansion
19and other improvements to Huntingdon
20County Career and Technology Center

 

21Project Allocation

2,500,000

22(Base Project Allocation - $2,500,000)

 

23(32) Indiana County

 

24(i) County projects

 

25(A) Acquisition, engineering, site
26preparation, infrastructure,
27construction and other related costs
28for development of vacant lots at
29Corporate Campus business park

 

30Project Allocation

1,000,000

1(Base Project Allocation - $1,000,000)

 

2(B) Acquisition, engineering, site
3preparation, infrastructure,
4construction and other related costs
5for development of multitenant
6building at Windy Ridge Business and
7Technology Park

 

8Project Allocation

1,000,000

9(Base Project Allocation - $1,000,000)

 

10(C) Acquisition, engineering, site
11preparation, infrastructure,
12construction and other related costs
13for development of industrial
14multitenant building known as
15Dixonville Commons

 

16Project Allocation

2,000,000

17(Base Project Allocation - $2,000,000)

 

18(D) Acquisition, engineering, site
19preparation, infrastructure,
20construction and other related costs
21for rehabilitation of Indiana
22Community Center Building

 

23Project Allocation

2,000,000

24(Base Project Allocation - $2,000,000)

 

25(E) Acquisition, engineering,
26infrastructure, construction and other
27related costs for development of
28countywide fiber optic network

 

29Project Allocation

2,000,000

30(Base Project Allocation - $2,000,000)

 

1(F) Acquisition, engineering, site
2preparation, infrastructure,
3construction and other related costs
4for development of multitenant
5building at 119 Business Park and
6Joseph Land development project

 

7Project Allocation

3,000,000

8(Base Project Allocation - $3,000,000)

 

9(G) Acquisition, engineering, site
10preparation, infrastructure,
11construction and other related costs
12for development of multipurpose
13building in White Township

 

14Project Allocation

3,000,000

15(Base Project Allocation - $3,000,000)

 

16(H) Acquisition, engineering, site
17preparation, infrastructure,
18construction and other related costs,
19including abatement of hazardous
20materials, for redevelopment of
21industrial building and conversion to
22multitenant building

 

23Project Allocation

3,000,000

24(Base Project Allocation - $3,000,000)

 

25(I) Acquisition, engineering, site
26preparation, infrastructure,
27construction and other related costs
28for development of vacant lots and
29acquisition of adjacent property at
30Windy Ridge Business and Technology

 

1Park

 

2Project Allocation

3,000,000

3(Base Project Allocation - $3,000,000)

 

4(J) Acquisition, engineering, site
5preparation, infrastructure,
6construction and other related costs
7for development of high bay,
8multitenant, industrial building at
9Windy Ridge Business and Technology
10Park

 

11Project Allocation

4,000,000

12(Base Project Allocation - $4,000,000)

 

13(K) Renovation, construction and other
14related costs for redevelopment of
15historic Rochester and Pittsburgh Coal
16Company building and conversion into a
17boutique hotel

 

18Project Allocation

4,000,000

19(Base Project Allocation - $4,000,000)

 

<-20(ii) Clymer Borough

 

21(A) Acquisition, infrastructure,
22redevelopment and other related costs
23to develop borough-owned property for
24senior residential development,
25ballfields, trails, veterans monument,
26green space and additional parking

 

27Project Allocation

1,650,000

28(Base Project Allocation - $1,650,000)

 

29(iii) Green Township

 

30(A) Construction, excavation,

 

1infrastructure and other related costs
2for new rail siding and transloading
3facility

 

4Project Allocation

1,500,000

5(Base Project Allocation - $1,500,000)

 

6(33) Jefferson County

 

7(i) County projects

 

8(A) Acquisition, infrastructure,
9construction and other related costs
10for economic project

 

11Project Allocation

10,000,000

12(Base Project Allocation -
13$10,000,000)

 

<-14(B) Development, construction,
15maintenance and other related costs
16for a hotel in Jefferson County

 

17Project Allocation

2,500,000

18(Base Project Allocation - $2,500,000)

 

19(ii) Brockway Borough

 

20(A) Acquisition, infrastructure,
21construction and other related costs
22for economic project to be located at
23intersection of Routes 219 and 28

 

24Project Allocation

10,000,000

25(Base Project Allocation -
26$10,000,000)

 

27(B) Acquisition, infrastructure,
28redevelopment, renovations and other
29related costs for educational and
30training facility

 

1Project Allocation

10,000,000

2(Base Project Allocation -
3$10,000,000)

 

4(iii) Eldred Township

 

5(A) Acquisition, infrastructure,
6construction and other related costs
7for economic development project in
8the county

 

9Project Allocation

1,000,000

10(Base Project Allocation - $1,000,000)

 

11(34) Juniata County

 

12(i) (Reserved)

 

13(35) Lackawanna County

 

14(i) County projects

 

15(A) Acquisition, construction,
16infrastructure and other related costs
17for Valley View Business Park
18Industrial Facility

 

19Project Allocation

5,000,000

20(Base Project Allocation - $5,000,000)

 

21(B) Acquisition, construction,
22renovations, infrastructure and other
23related costs for dental, medical,
24health sciences and patient care
25facilities project

 

26Project Allocation

20,000,000

27(Base Project Allocation -
28$20,000,000)

 

29(C) Acquisition, construction,
30renovations, infrastructure and other

 

1related costs for dental, medical,
2health sciences and patient care
3clinic

 

4Project Allocation

2,000,000

5(Base Project Allocation - $2,000,000)

 

6(ii) Archbald Borough

 

7(A) Construction, infrastructure and
8other costs related to Valley View
9Business Park redevelopment project

 

10Project Allocation

1,000,000

11(Base Project Allocation - $1,000,000)

 

12(B) Construction, infrastructure and
13other costs related for Archbald
14Business Park III redevelopment
15project

 

16Project Allocation

1,500,000

17(Base Project Allocation - $1,500,000)

 

18(C) Construction, infrastructure and
19other costs related to Valley View
20Business Park new building project

 

21Project Allocation

2,000,000

22(Base Project Allocation - $2,000,000)

 

23(D) Construction, infrastructure and
24other costs related to Archbald Route
256 Industrial Facility redevelopment
26project

 

27Project Allocation

2,000,000

28(Base Project Allocation - $2,000,000)

 

<-29(E) Acquisition, construction,
30infrastructure, redevelopment,

 

1abatement of hazardous materials and
2other related costs for economic
3development project along Peggy Drive
4in Archbald Township

 

5Project Allocation

1,000,000

6(Base Project Allocation - $1,000,000)

 

7(F) Construction, infrastructure and
8other related costs for Tinklepaugh
9Creek flood mitigation projects in
10Archbald and Blakely Boroughs

 

11Project Allocation

2,500,000

12(Base Project Allocation - $2,500,000)

 

13(ii.1) Archbald, Jessup and Blakely Boroughs

 

14(A) Acquisition, construction,
15infrastructure, redevelopment,
16abatement of hazardous materials and
17other related costs for Valley
18Community Civic Center project

 

19Project Allocation

2,500,000

20(Base Project Allocation - $2,500,000)

 

21(iii) Blakely Borough

 

22(A) Construction, infrastructure and
23other costs related to Blakely Borough
24Main Street Business District
25revitalization project

 

26Project Allocation

3,500,000

27(Base Project Allocation - $3,500,000)

 

28(iv) Carbondale Township

 

29(A) Construction, infrastructure and
30other costs related to Carbondale

 

1Technology Transfer Complex
2multitenant flex building project

 

3Project Allocation

361,000

4(Base Project Allocation - $361,000)

 

5(v) City of Carbondale

 

6(A) Acquisition, construction,
7infrastructure and other related costs
8for Carbondale Anchor Building
9redevelopment project

 

10Project Allocation

5,000,000

11(Base Project Allocation - $5,000,000)

 

12(vi) City of Scranton

 

13(A) Acquisition, construction,
14infrastructure and other related costs
15for Radisson Lackawanna Station
16restoration project

 

17Project Allocation

4,000,000

18(Base Project Allocation - $4,000,000)

 

19(B) Acquisition, construction,
20infrastructure and other related costs
21for Scranton Department of Public
22Works complex project

 

23Project Allocation

3,000,000

24(Base Project Allocation - $3,000,000)

 

25(C) Acquisition, construction,
26infrastructure and other related costs
27for Central Business District
28improvement project

 

29Project Allocation

2,000,000

30(Base Project Allocation - $2,000,000)

 

1(D) Acquisition, construction,
2infrastructure and other related costs
3for South Scranton Area Elm Street
4revitalization project

 

5Project Allocation

2,500,000

6(Base Project Allocation - $2,500,000)

 

7(E) Acquisition, construction,
8infrastructure and other related costs
9for Central Business District
10revitalization project

 

11Project Allocation

5,000,000

12(Base Project Allocation - $5,000,000)

 

13(F) Acquisition, construction,
14infrastructure and other related costs
15for Neighborhood Commercial District
16revitalization project

 

17Project Allocation

4,000,000

18(Base Project Allocation - $4,000,000)

 

19(G) Acquisition, construction,
20infrastructure and other related costs
21for new downtown office building

 

22Project Allocation

5,000,000

23(Base Project Allocation - $5,000,000)

 

24(H) Acquisition, construction,
25infrastructure and other related costs
26for Iron Arts District redevelopment
27project

 

28Project Allocation

5,000,000

29(Base Project Allocation - $5,000,000)

 

30(I) Acquisition, construction,

 

1infrastructure and other related costs
2for Iron Furnaces historic site
3project

 

4Project Allocation

10,000,000

5(Base Project Allocation -
6$10,000,000)

 

7(J) Acquisition, construction,
8infrastructure and other related costs
9for renovation of buildings in
10Downtown Business District for
11Lackawanna County Efficiency in
12Government project

 

13Project Allocation

3,000,000

14(Base Project Allocation - $3,000,000)

 

15(K) Construction, infrastructure and
16other costs related to Lackawanna
17County Park redevelopment and
18improvement projects

 

19Project Allocation

500,000

20(Base Project Allocation - $500,000)

 

21(L) Construction, infrastructure and
22other costs related to Lackawanna
23County Economic Development Initiative

 

24Project Allocation

2,500,000

25(Base Project Allocation - $2,500,000)

 

26(M) Acquisition, construction,
27infrastructure and other related costs
28for Lackawanna College Continuing
29Education expansion project

 

30Project Allocation

1,750,000

1(Base Project Allocation - $1,750,000)

 

2(N) Acquisition, construction,
3infrastructure and other related costs
4for Lackawanna College Learning
5Commons project

 

6Project Allocation

4,500,000

7(Base Project Allocation - $4,500,000)

 

8(O) Construction, infrastructure and
9other costs related to Lackawanna
10College street redevelopment project

 

11Project Allocation

1,500,000

12(Base Project Allocation - $1,500,000)

 

13(P) Construction, infrastructure and
14other costs related to Commonwealth
15Medical College redevelopment project

 

16Project Allocation

500,000

17(Base Project Allocation - $500,000)

 

18(Q) Construction, infrastructure,
19demolition and other costs related to
20Scranton Enterprise Center renovation
21project

 

22Project Allocation

1,000,000

23(Base Project Allocation - $1,000,000)

 

24(R) Construction, infrastructure and
25other costs related to former Murray
26Corporation Building redevelopment
27project

 

28Project Allocation

4,000,000

29(Base Project Allocation - $4,000,000)

 

30(S) Acquisition, construction,

 

1renovation, infrastructure and other
2related costs for Mt. Pleasant
3Corporate Center Office Building
4redevelopment project

 

5Project Allocation

3,000,000

6(Base Project Allocation - $3,000,000)

 

7(T) Construction and other related costs
8to rebuild facilities at Scranton's
9Farmer's Market and Albright Avenue

 

10Project Allocation

1,500,000

11(Base Project Allocation - $1,500,000)

 

12(U) Construction, infrastructure and
13other costs related to University of
14Scranton South Side Sports Complex
15project

 

16Project Allocation

7,500,000

17(Base Project Allocation - $7,500,000)

 

18(V) Construction, infrastructure and
19other costs related to University of
20Scranton rehabilitation project

 

21Project Allocation

20,000,000

22(Base Project Allocation -
23$20,000,000)

 

24(W) Construction, infrastructure and
25other costs related to expansion of
26Sette La Verghetta Center for the
27Performing Arts at Marywood University

 

28Project Allocation

3,000,000

29(Base Project Allocation - $3,000,000)

 

30(X) Construction, infrastructure and

 

1other costs related to clinical and
2community services at Marywood
3University's South Campus renovation
4project

 

5Project Allocation

3,000,000

6(Base Project Allocation - $3,000,000)

 

7(Y) Construction, infrastructure and
8other costs related to The Knowledge
9(Learning) Commons at Marywood
10University redevelopment project

 

11Project Allocation

12,500,000

12(Base Project Allocation -
13$12,500,000)

 

14(Z) Acquisition, construction,
15infrastructure and other costs related
16to Wright Primary Care Center
17development project

 

18Project Allocation

2,500,000

19(Base Project Allocation - $2,500,000)

 

20(AA) Acquisition, construction,
21infrastructure and other costs related
22to redevelopment of Lackawanna Avenue

 

23Project Allocation

10,000,000

24(Base Project Allocation -
25$10,000,000)

 

26(BB) Acquisition, construction,
27infrastructure and other costs related
28to compressed natural gas fueling
29station and maintenance facility

 

30Project Allocation

6,000,000

1(Base Project Allocation - $6,000,000)

 

2(CC) Acquisition, construction,
3infrastructure and other costs related
4to intermodal transportation center

 

5Project Allocation

1,000,000

6(Base Project Allocation - $1,000,000)

 

7(DD) Acquisition, construction,
8infrastructure and other costs related
9to Timmy's Town Center Children's
10Museum project

 

11Project Allocation

5,000,000

12(Base Project Allocation - $5,000,000)

 

13(EE) Acquisition, renovations,
14construction, infrastructure and other
15related costs for dental, medical,
16health sciences and patient care
17clinic

 

18Project Allocation

2,000,000

19(Base Project Allocation - $2,000,000)

 

20(vi.1) Covington Township

 

21(A) Construction, infrastructure
22improvements and other costs for the
23Moffat Estate redevelopment project

 

24Project Allocation

500,000

25(Base Project Allocation - $500,000)

 

26(vii) Dickson City

 

27(A) Acquisition, construction,
28infrastructure and other costs related
29to Dickson City Senior/Civic Center
30expansion project

 

1Project Allocation

2,500,000

2(Base Project Allocation - $2,500,000)

 

3(viii) Jefferson Township

 

4(A) Construction, infrastructure and
5other costs related to development of
6commercial site and to provide
7sanitary sewer infrastructure for
8project

 

9Project Allocation

1,000,000

10(Base Project Allocation - $1,000,000)

 

11(ix) Jessup Borough

 

12(A) Construction, infrastructure and
13other costs related to new building at
14Jessup Small Business Center

 

15Project Allocation

1,500,000

16(Base Project Allocation - $1,500,000)

 

17(B) Acquisition, construction,
18infrastructure and other costs related
19to Valley View Business Park
20Interchange project

 

21Project Allocation

8,000,000

22(Base Project Allocation - $8,000,000)

 

23(x) Laplume Township

 

24(A) Construction, infrastructure and
25other costs related to recreational
26facilities and housing projects for
27Keystone College

 

28Project Allocation

3,500,000

29(Base Project Allocation - $3,500,000)

 

30(xi) Mayfield Borough

 

1(A) Acquisition, construction,
2infrastructure and other costs related
3to Lackawanna Business Center
4redevelopment project

 

5Project Allocation

3,000,000

6(Base Project Allocation - $3,000,000)

 

7(xii) Moosic Borough

 

8(A) Construction, infrastructure
9improvements, and other costs related
10to former JC Penney building expansion
11project

 

12Project Allocation

2,000,000

13(Base Project Allocation - $2,000,000)

 

14(B) Acquisition, construction,
15infrastructure and other costs related
16to new building at Glenmaura Corporate
17Center

 

18Project Allocation

2,000,000

19(Base Project Allocation - $2,000,000)

 

20(C) Construction, infrastructure and
21other costs related to sanitary sewer
22infrastructure for industrial park

 

23Project Allocation

1,000,000

24(Base Project Allocation - $1,000,000)

 

<-25(xii.1) Moscow Borough

 

26(A) Acquisition, construction,
27infrastructure, redevelopment,
28abatement of hazardous materials and
29other related costs for senior housing
30development

 

1Project Allocation

4,000,000

2(Base Project Allocation - $4,000,000)

 

3(xiii) Scott Township

 

4(A) Construction, infrastructure
5improvements and other costs related
6to Scott Township Technology and
7Industrial Facility redevelopment
8project

 

9Project Allocation

3,000,000

10(Base Project Allocation - $3,000,000)

 

11(xiii.1) South Abington Township

 

12(A) Acquisition, development,
13construction, infrastructure, design
14and other costs associated with the
15Abington Township Maintenance Facility

 

16Project Allocation

2,000,000

17(Base Project Allocation - $2,000,000)

 

18(B) Construction, design, infrastructure
19improvements and other costs for the
20Phelps Student Center renovation
21project at Baptist Bible College

 

22Project Allocation

1,000,000

23(Base Project Allocation - $1,000,000)

 

24(C) Acquisition, development,
25construction, infrastructure, design
26and other costs associated with a
27development project at Bible Baptist
28College

 

29Project Allocation

20,000,000

30(Base Project Allocation -

 

1$20,000,000)

 

2(D) Construction, design, infrastructure
3improvements and other costs for the
4Jackson Hall renovations at Bible
5Baptist College

 

6Project Allocation

2,000,000

7(Base Project Allocation - $2,000,000)

 

8(xiv) Taylor Borough

 

9(A) Acquisition, construction,
10infrastructure and other costs related
11to Taylor redevelopment
12--Colliery/Feltsville project

 

13Project Allocation

5,000,000

14(Base Project Allocation - $5,000,000)

 

15(B) Acquisition, construction,
16infrastructure and other costs related
17to Taylor Borough industrial
18redevelopment project

 

19Project Allocation

5,000,000

20(Base Project Allocation - $5,000,000)

 

21(xv) West Mifflin Borough

 

22(A) Acquisition, construction,
23infrastructure and other costs related
24to development of aviation, industrial
25and commercial sites at or surrounding
26Allegheny County Airport

 

27Project Allocation

20,000,000

28(Base Project Allocation -
29$20,000,000)

 

30(36) Lancaster County

 

1(i) County projects

 

2(A) Infrastructure upgrades, construction
3and other related costs for operating
4room expansion at Heart of Lancaster
5Regional Medical Center

 

6Project Allocation

1,500,000

7(Base Project Allocation - $1,500,000)

 

<-8(B) Acquisition, construction,
9infrastructure, redevelopment and
10other related costs for medical
11education building

 

12Project Allocation

20,000,000

13(Base Project Allocation -
14$20,000,000)

 

15(ii) Redevelopment Authority of the County of
16Lancaster

 

17(A) Acquisition, infrastructure,
18construction and other related costs
19for development and construction of
20Rock Lititz, a campus-style commercial
21park

 

22Project Allocation

7,000,000

23(Base Project Allocation - $7,000,000)

 

24(iii) City of Lancaster

 

25(A) Acquisition, design, infrastructure,
26construction and other related costs
27for renovations to North Museum of
28Natural History and Science, including
29new roof, dome and SciDome touch
30projection, sound and software system

 

1Project Allocation

1,000,000

2(Base Project Allocation - $1,000,000)

 

3(B) Acquisition, design, infrastructure,
4construction and other related costs
5for mixed-use facility in center of
6city to be utilized by Millersville
7University, community services and
8shopping venues

 

9Project Allocation

5,000,000

10(Base Project Allocation - $5,000,000)

 

11(C) Acquisition, design, infrastructure,
12construction and other related costs
13for state-of-the-art medical education
14building for Lancaster General College
15of Nursing and Allied Sciences

 

16Project Allocation

22,000,000

17(Base Project Allocation -
18$22,000,000)

 

19(D) Infrastructure, construction and
20other related costs for design and
21construction of state-of-the-art
22facility to be utilized as wellness
23and medical center and aquatic
24competition and leisure facility

 

25Project Allocation

22,500,000

26(Base Project Allocation -
27$22,500,000)

 

28(E) Design, infrastructure, construction
29and other related costs for
30renovations to emergency department

 

1and entrances to Lancaster Regional
2Medical Center

 

3Project Allocation

2,500,000

4(Base Project Allocation - $2,500,000)

 

<-5(F) Construction, infrastructure,
6redevelopment and other related costs
7for green infrastructure initiative

 

8Project Allocation

12,000,000

9(Base Project Allocation -
10$12,000,000)

 

11(G) Acquisition, construction,
12infrastructure, redevelopment and
13other related costs for North Prince
14Street redevelopment project

 

15Project Allocation

8,000,000

16(Base Project Allocation - $8,000,000)

 

17(H) Acquisition, construction,
18infrastructure, redevelopment and
19other related costs for revitalization
20initiatives in northeastern area

 

21Project Allocation

5,000,000

22(Base Project Allocation - $5,000,000)

 

23(I) Acquisition, construction,
24infrastructure, redevelopment and
25other related costs for redevelopment
26projects along South Market Street and
27South Prince Street

 

28Project Allocation

12,000,000

29(Base Project Allocation -
30$12,000,000)

 

1(J) Acquisition, construction,
2infrastructure, redevelopment and
3other related costs for revitalization
4initiatives in southwestern area

 

5Project Allocation

8,000,000

6(Base Project Allocation - $8,000,000)

 

7(K) Acquisition, construction,
8redevelopment and other related costs
9for redevelopment of former Stahr
10Armory

 

11Project Allocation

5,000,000

12(Base Project Allocation - $5,000,000)

 

13(L) Acquisition, construction,
14infrastructure, redevelopment and
15other related costs for West King
16Street redevelopment project

 

17Project Allocation

10,000,000

18(Base Project Allocation -
19$10,000,000)

 

20(iv) Elizabethtown Borough

 

21(A) Design, infrastructure, renovations,
22abatement of hazardous materials and
23other related costs for building
24access modifications, including
25installation of card access boxes,
26video surveillance cameras, door and
27window improvements and fire control
28at Elizabethtown College

 

29Project Allocation

1,000,000

30(Base Project Allocation - $1,000,000)

 

1(B) Site development, infrastructure
2improvements, construction and
3renovation of instructional classroom
4building at Elizabethtown College

 

5Project Allocation

3,000,000

6(Base Project Allocation - $3,000,000)

 

7(C) Site development, infrastructure
8improvements, construction and other
9related costs for athletic facilities
10at Elizabethtown College

 

11Project Allocation

3,000,000

12(Base Project Allocation - $3,000,000)

 

13(D) Site development, infrastructure
14improvements, renovation, construction
15and other related costs for buildings
16and residence halls at Elizabethtown
17College

 

18Project Allocation

5,000,000

19(Base Project Allocation - $5,000,000)

 

<-20(E) Construction, renovation and other
21related costs for site development and
22infrastructure improvements of
23buildings and residence halls at
24Elizabethtown College

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(F) Site development, infrastructure
28improvements, construction, renovation
29and other related costs for
30instructional classroom building at

 

1Elizabethtown College

 

2Project Allocation

3,000,000

3(Base Project Allocation - $3,000,000)

 

4(G) Construction and other related costs
5for athletic fields, field house,
6fitness center and wellness center for
7Elizabethtown College

 

8Project Allocation

3,000,000

9(Base Project Allocation - $3,000,000)

 

10(H) Renovations, improvements and other
11related costs for safety and security
12at Elizabethtown College

 

13Project Allocation

1,000,000

14(Base Project Allocation - $1,000,000)

 

<-15(v) Hempfield Township

 

<-16(v) West Hempfield Township

 

17(A) Purchase, renovation and other
18related costs for community homes by
19Keystone Human Services to support
20persons with intellectual disabilities

 

21Project Allocation

3,740,000

22(Base Project Allocation - $3,740,000)

 

23(vi) Manheim Township

 

24(A) Purchase, renovation and other
25related costs for community homes by
26Keystone Human Services to support
27persons with intellectual disabilities

 

28Project Allocation

3,740,000

29(Base Project Allocation - $3,740,000)

 

30(vii) Marietta Borough

 

1(A) Acquisition, site preparation,
2infrastructure, construction and other
3related costs for economic development
4projects, including development of
5museum on mixed-use site

 

6Project Allocation

10,000,000

7(Base Project Allocation -
8$10,000,000)

 

9(viii) Mt. Joy Township

 

10(A) Purchase, renovation and other
11related costs for community homes by
12Keystone Human Services to support
13persons with intellectual disabilities

 

14Project Allocation

3,740,000

15(Base Project Allocation - $3,740,000)

 

16(v) <-(ix) New Holland Borough

 

17(A) Acquisition, infrastructure,
18construction and other related costs
19to expand and modernize food products
20manufacturing facility

 

21Project Allocation

3,000,000

22(Base Project Allocation - $3,000,000)

 

<-23(x) Salisbury Township

 

24(A) Acquisition, construction,
25infrastructure improvement, including,
26but not limited to, improvements
27related to road, highway and parking
28and other related costs for direct
29fulfillment center in the area of the
30town of Gap

 

1Project Allocation

20,000,000

2(Base Project Allocation -
3$20,000,000)

 

4(vi) <-(xi) Warwick Township

 

5(A) Acquisition, infrastructure,
6construction and other related costs
7for development and construction of
8Rock Lititz, a campus-style commercial
9park

 

10Project Allocation

7,000,000

11(Base Project Allocation - $7,000,000)

 

12(37) Lawrence County

 

13(i) City of New Castle

 

14(A) Infrastructure, construction and
15other related costs for Jameson Health
16System expansion of ambulatory
17services, renovation and technology
18enhancements

 

19Project Allocation

5,000,000

20(Base Project Allocation - $5,000,000)

 

<-21(B) Acquisition, construction,
22infrastructure and other related costs
23for redevelopment in industrial
24corridor

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(ii) Shenango Township

 

28(A) Construction, infrastructure and
29other related costs for industrial
30park

 

1Project Allocation

7,000,000

2(Base Project Allocation - $7,000,000)

 

3(iii) Union Township

 

4(A) Acquisition, construction,
5infrastructure, redevelopment and
6other related costs for mixed-use
7commerce park

 

8Project Allocation

10,000,000

9(Base Project Allocation -
10$10,000,000)

 

11(B) Acquisition, construction,
12infrastructure, redevelopment and
13other related costs for development of
14mixed-use commercial park

 

15Project Allocation

10,000,000

16(Base Project Allocation -
17$10,000,000)

 

18(iv) Wampum and New Beaver Boroughs

 

19(A) Acquisition, construction,
20infrastructure, redevelopment and
21other related costs for industrial
22parks and related projects

 

23Project Allocation

10,000,000

24(Base Project Allocation -
25$10,000,000)

 

26(38) Lebanon County

 

27(i) County projects

 

28(A) Design, engineering, infrastructure
29improvements, construction and other
30related costs for redevelopment of

 

1Good Samaritan Hospital Cancer Care
2Center

 

3Project Allocation

5,000,000

4(Base Project Allocation - $5,000,000)

 

5(B) Acquisition, infrastructure
6improvements, construction and related
7costs for development of North
8Cornwall Commons project

 

9Project Allocation

5,000,000

10(Base Project Allocation - $5,000,000)

 

<-11(ii) City of Lebanon

 

12(A) Acquisition, construction and other
13costs related to additional student
14parking for Harrisburg Area Community
15College, Lebanon Campus

 

16Project Allocation

500,000

17(Base Project Allocation - $500,000)

 

<-18(ii) (iii) Lebanon County Health Facilities
19Authority

 

20(A) Acquisition, construction,
21infrastructure and other related costs
22for Cancer Treatment Center in South
23Lebanon Township

 

24Project Allocation

5,000,000

25(Base Project Allocation - $5,000,000)

 

<-26(iii) (iv) East Hanover Township

 

27(A) Purchase, renovation and other
28related costs for community homes to
29support persons with intellectual
30disabilities and development of center

 

1for Susquehanna Service Dogs program,
2including construction of kennels and
3renovations to create training center
4and offices by Keystone Human Services

 

5Project Allocation

3,740,000

6(Base Project Allocation - $3,740,000)

 

7(39) Lehigh County

 

8(i) Catasauqua Borough

 

9(A) Construction, infrastructure
10improvements and other costs related
11to the mixed-use Catasauqua
12redevelopment project

 

13Project Allocation

5,000,000

14(Base Project Allocation - $5,000,000)

 

<-15(B) Acquisition, construction,
16infrastructure, abatement of hazardous
17materials and other related costs for
18redevelopment project

 

19Project Allocation

5,000,000

20(Base Project Allocation - $5,000,000)

 

21(ii) City of Allentown

 

22(A) Acquisition, abatement of hazardous
23materials, redevelopment and other
24related costs for construction of
25mixed-use facility adjacent to Sacred
26Heart Hospital

 

27Project Allocation

2,500,000

28(Base Project Allocation - $2,500,000)

 

<-29(B) Infrastructure, rehabilitation,
30construction and renovation of health

 

1center facilities

 

<-2(B) Infrastructure, rehabilitation,
3construction and renovation of Lehigh
4Valley Health Network Health Center

 

5Project Allocation

3,000,000

6(Base Project Allocation - $3,000,000)

 

7(C) Construction, renovation and other
8related costs for rehabilitation of
9Sacred Heart Hospital

 

10Project Allocation

5,000,000

11(Base Project Allocation - $5,000,000)

 

12(D) Acquisition, renovations, abatement
13of hazardous materials, construction
14and other related costs for
15rehabilitation of Civic Theatre of
16Allentown

 

17Project Allocation

3,500,000

18(Base Project Allocation - $3,500,000)

 

19(E) Land acquisition, infrastructure
20improvements, construction and other
21costs related to Little Lehigh Creek
22Industrial Corridor redevelopment
23project

 

24Project Allocation

2,000,000

25(Base Project Allocation - $2,000,000)

 

26(F) Infrastructure, renovations,
27construction and other related cost
28for Miller Symphony Hall's Lyric and
29Balcony rehabilitation projects

 

30Project Allocation

250,000

1(Base Project Allocation - $250,000)

 

2(G) Acquisition, renovations,
3construction and other related cost
4for DaVinci Discovery Center of
5Science and Technology

 

6Project Allocation

2,500,000

7(Base Project Allocation - $2,500,000)

 

8(H) Acquisition, infrastructure,
9abatement of hazardous materials,
10construction and other related costs
11for development of properties in City
12of Allentown

 

13Project Allocation

1,000,000

14(Base Project Allocation - $1,000,000)

 

15(I) Acquisition, infrastructure,
16abatement of hazardous materials,
17construction and other related costs
18for redevelopment of Oakwood Medical
19Associates building

 

20Project Allocation

2,500,000

21(Base Project Allocation - $2,500,000)

 

22(J) Acquisition, infrastructure,
23abatement of hazardous materials,
24construction and other related costs
25for development of medical office
26building in the vicinity of Sacred
27Heart Hospital

 

28Project Allocation

5,000,000

29(Base Project Allocation - $5,000,000)

 

<-30(K) Renovation, rehabilitation and other

 

1related costs for Episcopal House
2facility

 

3Project Allocation

1,000,000

4(Base Project Allocation - $1,000,000)

 

5(L) Construction, redevelopment,
6abatement of hazardous materials and
7other related costs for sports
8medicine, rehabilitation and health
9center facilities

 

10Project Allocation

3,000,000

11(Base Project Allocation - $3,000,000)

 

12(M) Acquisition, construction,
13redevelopment, abatement of hazardous
14materials and other related costs for
15multistory adaptive reuse project

 

16Project Allocation

10,000,000

17(Base Project Allocation -
18$10,000,000)

 

19(N) Construction, infrastructure,
20abatement of hazardous materials and
21other related costs for redevelopment
22of former Agere Technologies plant
23campus

 

24Project Allocation

500,000

25(Base Project Allocation - $500,000)

 

26(O) Construction, infrastructure,
27redevelopment and other related costs
28for athletic field improvements at
29Cedar Crest College

 

30Project Allocation

2,000,000

1(Base Project Allocation - $2,000,000)

 

<-2(P) Acquisition, construction,
3infrastructure and other related costs
4for St. Luke's University Health
5Network

 

6Project Allocation

5,000,000

7(Base Project Allocation - $5,000,000)

 

8(iii) City of Bethlehem

 

9(A) Construction, infrastructure
10improvements and other costs related
11to Lehigh Valley Hospital renovation
12and expansion project

 

13Project Allocation

10,000,000

14(Base Project Allocation -
15$10,000,000)

 

<-16(B) Acquisition, construction,
17infrastructure and other related costs
18for St. Luke's University Health
19Network

 

20Project Allocation

5,000,000

21(Base Project Allocation - $5,000,000)

 

22(iv) Fountain Hill Borough

 

23(A) Construction, infrastructure
24improvements and other costs related
25to St. Luke's Hospital Bethlehem
26Campus expansion project

 

27Project Allocation

5,000,000

28(Base Project Allocation - $5,000,000)

 

29(B) Construction, infrastructure
30improvements and other costs related

 

1to storm water retention system for
2flooding mitigation in Mill 2 complex

 

3Project Allocation

1,000,000

4(Base Project Allocation - $1,000,000)

 

<-5(C) Construction, infrastructure,
6redevelopment and other related costs
7for Mill 2 projects

 

8Project Allocation

750,000

9(Base Project Allocation - $750,000)

 

10(v) Heidelberg Township

 

11(A) Acquisition, construction,
12infrastructure, abatement of hazardous
13materials and other related costs for
14municipal government center

 

15Project Allocation

2,000,000

16(Base Project Allocation - $2,000,000)

 

17(vi) North Whitehall Township

 

18(A) Construction, infrastructure and
19other related costs for adult
20inpatient hospital on KidsPeace
21Orchard Hills Campus

 

22Project Allocation

2,000,000

23(Base Project Allocation - $2,000,000)

 

24(vii) Salisbury Township

 

25(A) Construction, infrastructure and
26other related costs for renovation and
27expansion of Lehigh Valley Hospital
28Cedar Crest

 

29Project Allocation

10,000,000

30(Base Project Allocation -

 

1$10,000,000)

 

2(viii) South Whitehall Township

 

3(A) Construction, renovation and other
4related costs for expansion and
5development of St. Luke's Hospital
6Anderson Campus

 

7Project Allocation

20,000,000

8(Base Project Allocation -
9$20,000,000)

 

10(B) Construction, renovation and other
11related costs necessary to further
12develop St. Luke's West End Medical
13Center

 

14Project Allocation

5,000,000

15(Base Project Allocation - $5,000,000)

 

<-16(C) Construction and other related costs
17for regional EMS and Public Safety
18Center

 

19Project Allocation

3,500,000

20(Base Project Allocation - $3,500,000)

 

21(ix) Upper Macungie Township

 

22(A) Acquisition, construction,
23infrastructure, abatement of hazardous
24materials and other related costs for
25new business development

 

26Project Allocation

1,000,000

27(Base Project Allocation - $1,000,000)

 

28(B) Construction, infrastructure and
29other related costs for new police
30station

 

1Project Allocation

1,900,000

2(Base Project Allocation - $1,900,000)

 

3(40) Luzerne County

 

4(i) County projects

 

5(A) Acquisition, construction,
6infrastructure and other costs related
7to development of Lackawanna River
8Heritage Trail, lower section, along
9Lackawanna River

 

10Project Allocation

3,000,000

11(Base Project Allocation - $3,000,000)

 

12(B) For acquisition, construction,
13infrastructure, redevelopment,
14renovations and other costs associated
15with an economic development project
16in the county

 

17Project Allocation

7,500,000

18(Base Project Allocation - $7,500,000)

 

19(C) Land acquisition, infrastructure
20improvements, demolition, site
21improvement, renovation, addition,
22utility expansion, construction,
23purchase of medically necessary
24fixtures and other related costs for
25hospital and other related facilities
26of the Greater Hazelton Health
27Alliance

 

28Project Allocation

20,000,000

29(Base Project Allocation -
30$20,000,000)

 

<-1(D) Acquisition, construction,
2infrastructure and other related costs
3for 20-megawatt frequency regulation
4plant

 

5Project Allocation

10,000,000

6(Base Project Allocation -
7$10,000,000)

 

<-8(E) Construction, site preparation,
9engineering, grading, rail, ties,
10ballast, acquiring and installing rail
11scale and other related materials to
12extend siding to provide access to
13Northeast Recycling Solutions

 

14Project Allocation

2,000,000

15(Base Project Allocation - $2,000,000)

 

16(i.1) City of Hazelton

 

17(A) For the acquisition, construction,
18infrastructure, redevelopment,
19renovations and other costs associated
20with an economic development project
21in the city

 

22Project Allocation

5,000,000

23(Base Project Allocation - $5,000,000)

 

<-24(ii) City of Nanticoke

 

<-25(A) (B) Land acquisition, infrastructure
26improvements, site improvement,
27renovation, construction and other
28costs related to Greater Hazleton
29Health Alliance Health and Wellness
30Center

 

1Project Allocation

4,000,000

2(Base Project Allocation - $4,000,000)

 

<-3(ii) City of Nanticoke

 

<-4(B) (A) For the acquisition,
5construction, infrastructure,
6redevelopment, renovations and other
7costs associated with an economic
8development project in the city

 

9Project Allocation

5,000,000

10(Base Project Allocation - $5,000,000)

 

11(iii) City of Pittston

 

12(A) Acquisition, construction,
13infrastructure and other costs related
14to Main & Market Professional Center
15project

 

16Project Allocation

2,500,000

17(Base Project Allocation - $2,500,000)

 

18(B) For the acquisition, construction,
19infrastructure, redevelopment,
20renovations and other costs associated
21with an economic development project
22in the city

 

23Project Allocation

5,000,000

24(Base Project Allocation - $5,000,000)

 

<-25(C) Construction, infrastructure and
26other related costs for library
27expansion project

 

28Project Allocation

500,000

29(Base Project Allocation - $500,000)

 

30(iv) City of Wilkes-Barre

 

1(A) Acquisition, construction,
2infrastructure and other costs related
3to redevelopment of Citizens Bank
4Center

 

5Project Allocation

5,000,000

6(Base Project Allocation - $5,000,000)

 

7(B) Construction, infrastructure
8improvements and other costs related
9to Wilkes University engineering
10school development project

 

11Project Allocation

5,000,000

12(Base Project Allocation - $5,000,000)

 

13(C) For the acquisition, construction,
14infrastructure, redevelopment,
15renovations and other costs associated
16with an economic development project
17in the city

 

18Project Allocation

5,000,000

19(Base Project Allocation - $5,000,000)

 

<-20(D) Acquisition, construction,
21infrastructure and other related costs
22for expansion and energy
23sustainability project at King's
24College

 

25Project Allocation

1,500,000

26(Base Project Allocation - $1,500,000)

 

<-27(E) Acquisition, construction,
28infrastructure, redevelopment,
29abatement of hazardous materials and
30other costs related to King's

 

1College's acquisition and renovation
2of the Ramada

 

3Project Allocation

7,000,000

4(Base Project Allocation - $7,000,000)

 

5(v) Dupont Borough

 

6(A) Acquisition, construction,
7infrastructure and other costs related
8to Wilkes-Barre/Scranton International
9Airport economic development project

 

10Project Allocation

2,000,000

11(Base Project Allocation - $2,000,000)

 

12(B) Acquisition, cons<-truction,
13infrastructure, redevelopment,
14abatement of hazardous materials and
15other related costs for senior housing
16development

 

17Project Allocation

4,000,000

18(Base Project Allocation - $4,000,000)

 

19(vi) Hanover Township

 

20(A) Rehabilitate existing rail
21infrastructure and construct transload
22facility, including site preparation,
23engineering, grading, rail, ties,
24ballast, switch relocation, paving,
25gravel, fabrication of concrete pad,
26acquiring and installing truck scale
27and other related materials necessary
28in the operation of the new facility

 

29Project Allocation

1,400,000

30(Base Project Allocation - $1,400,000)

 

1(vi) Plains Township

<-

2(vii) Plains Township

<-

3(A) Construction, infrastructure
4improvements and other costs related
5to Ultimate Sports facility project

 

6Project Allocation

6,000,000

7(Base Project Allocation - $6,000,000)

 

8(41) Lycoming County

 

9(i) County projects

 

10(A) Construction, rehabilitation and
11other related costs to serve NuWeld
12Corporation manufacturing facility

 

13Project Allocation

1,000,000

14(Base Project Allocation - $1,000,000)

 

15(B) Construction, demolition and other
16costs related to Williamsport Regional
17Airport terminal building project

 

18Project Allocation

3,000,000

19(Base Project Allocation - $3,000,000)

 

20(C) Design and construction of facility
21improvements, including directional
22signage, terminal building,
23renovations and parking at
24Williamsport Regional Airport

 

25Project Allocation

3,676,000

26(Base Project Allocation - $3,676,000)

 

27(D) Acquisition, rehabilitation,
28construction and other related costs
29for health care and housing facilities
30for Susquehanna Health System

 

1Project Allocation

20,000,000

2(Base Project Allocation -
3$20,000,000)

 

4(E) Acquisition, infrastructure,
5construction, redevelopment and other
6related costs for Susquehanna
7Community Health and Dental Center

 

8Project Allocation

10,000,000

9(Base Project Allocation -
10$10,000,000)

 

11(F) Acquisition, infrastructure,
12construction and other related costs
13for county forensic science center

 

14Project Allocation

2,000,000

15(Base Project Allocation - $2,000,000)

 

16(G) Acquisition, construction,
17infrastructure and other related costs
18for mixed-use development of land
19located at intersection of Brushy
20Ridge Road and Fairfield Road in
21Fairfield Township

 

22Project Allocation

10,000,000

23(Base Project Allocation -
24$10,000,000)

 

<-25(H) Acquisition, construction,
26redevelopment and other related costs
27for Susquehanna Health System
28facilities

 

29Project Allocation

20,000,000

30(Base Project Allocation -

 

1$20,000,000)

 

<-2(I) Acquisition, construction, facility
3improvements, machinery and equipment
4costs related to renovation and
5expansion with Jersey Shore Steel

 

6Project Allocation

2,500,000

7(Base Project Allocation - $2,500,000)

 

8(i.1) City of Williamsport

 

9(A) Construction, infrastructure and
10other related costs for YMCA community
11center

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

14(B) Construction, infrastructure,
15abatement of hazardous materials and
16other related costs for Lycoming
17Engines Facility improvement project

 

18Project Allocation

2,255,000

19(Base Project Allocation - $2,255,000)

 

20(C) Construction, infrastructure and
21other related costs for Williamsport
22YMCA

 

23Project Allocation

5,000,000

24(Base Project Allocation - $5,000,000)

 

25(ii) Muncy Township

 

26(A) Acquisition, site preparation,
27infrastructure and construction for
28commercial and hotel development
29project to be constructed at Lycoming
30Mall Road and Lycoming Mall Drive

 

1Project Allocation

2,000,000

2(Base Project Allocation - $2,000,000)

 

3(42) McKean County

 

4(i) County projects

 

5(A) Acquisition, infrastructure,
6construction and other related costs
7for economic project

 

8Project Allocation

10,000,000

9(Base Project Allocation -
10$10,000,000)

 

11(ii) City of Bradford

 

12(A) Land acquisition, demolition, site
13clearance, building rehabilitation,
14building construction, site work,
15infrastructure, gateway and
16streetscape improvements, waterfront
17development, recreational projects,
18storm water management for flood
19control and other community
20improvements for economic development
21and community impact projects

 

22Project Allocation

10,000,000

23(Base Project Allocation -
24$10,000,000)

 

<-25(B) Renovation, construction and other
26related costs to modernize, expand and
27improve existing facilities of
28rehabilitation center for individuals
29with disabilities

 

30Project Allocation

1,000,000

1(Base Project Allocation - $1,000,000)

 

2(iii) Foster Township

 

3(A) Construction, site work,
4infrastructure improvements, land
5acquisition and other related costs
6for an at-risk youth education and
7treatment facility on Main Campus of
8Beacon Light in Foster Township

 

9Project Allocation

10,000,000

10(Base Project Allocation -
11$10,000,000)

 

12(43) Mercer County

 

13(i) County projects

 

14(A) Infrastructure, construction and
15other related costs for WaterFire
16Sharon riverbank development

 

17Project Allocation

400,000

18(Base Project Allocation - $400,000)

 

19(B) Infrastructure and other related
20costs for construction of multitenant
21facility in Reynolds Industrial Park

 

22Project Allocation

1,000,000

23(Base Project Allocation - $1,000,000)

 

24(C) Acquisition, infrastructure,
25construction and other related costs,
26including abatement of hazardous
27materials, for rehabilitation of
28Damascuc-Bishop Tube facility

 

29Project Allocation

1,500,000

30(Base Project Allocation - $1,500,000)

 

1(D) Acquisition, rehabilitation,
2construction and other related costs
3for development of Penn-Ohio Center
4for Arts & Technology

 

5Project Allocation

2,225,000

6(Base Project Allocation - $2,225,000)

 

<-7(E) Acquisition, construction,
8infrastructure and other related costs
9for facilities development

 

10Project Allocation

7,500,000

11(Base Project Allocation - $7,500,000)

 

12(F) Construction, infrastructure and
13other related costs for workforce
14development center

 

15Project Allocation

2,225,000

16(Base Project Allocation - $2,225,000)

 

17(G) Acquisition, construction,
18infrastructure, redevelopment and
19other related costs for health care
20center multitenant facility

 

21Project Allocation

2,000,000

22(Base Project Allocation - $2,000,000)

 

23(H) Acquisition, construction,
24infrastructure, redevelopment,
25abatement of hazardous materials and
26other related costs for redevelopment
27of industrial facility

 

28Project Allocation

2,000,000

29(Base Project Allocation - $2,000,000)

 

30(I) Acquisition, construction,

 

1infrastructure and other related costs
2for industrial or commercial facility

 

3Project Allocation

5,000,000

4(Base Project Allocation - $5,000,000)

 

5(ii) Greenville Area Economic Development
6Corporation

 

7(A) Acquisition, rehabilitation,
8construction and other related costs
9for redevelopment of Greenville
10Trinity Industries property

 

11Project Allocation

3,000,000

12(Base Project Allocation - $3,000,000)

 

13(B) Renovation and rehabilitation of
14historical building to transform it
15into training facility for Greenville
16Neuromodulation Clinic

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(iii) City of Farrell

 

20(A) Acquisition, construction,
21infrastructure, redevelopment and
22other related costs for industrial
23plaza

 

24Project Allocation

2,000,000

25(Base Project Allocation - $2,000,000)

 

26(iii) <-(iv) City of Hermitage

 

27(A) Acquisition, construction, renovation
28and infrastructure improvements to
29industrial facility

 

30Project Allocation

2,000,000

1(Base Project Allocation - $2,000,000)

 

2(B) Acquisition, construction and
3infrastructure improvements for
4business park project

 

5Project Allocation

3,000,000

6(Base Project Allocation - $3,000,000)

 

<-7(C) Acquisition, construction and other
8related costs for facility development

 

9Project Allocation

1,500,000

10(Base Project Allocation - $1,500,000)

 

11(D) Acquisition, construction,
12infrastructure and other related costs
13for business park project

 

14Project Allocation

3,000,000

15(Base Project Allocation - $3,000,000)

 

16(E) Acquisition, construction,
17infrastructure and other related costs
18for industrial facility

 

19Project Allocation

2,000,000

20(Base Project Allocation - $2,000,000)

 

21(v) City of Sharon

 

22(A) Construction, infrastructure,
23redevelopment and other related costs
24for development of downtown Sharon

 

25Project Allocation

3,000,000

26(Base Project Allocation - $3,000,000)

 

27(B) Acquisition, construction,
28infrastructure, redevelopment and
29other related costs for development
30projects along Shenango River

 

1Project Allocation

500,000

2(Base Project Allocation - $500,000)

 

3(44) Mifflin County

 

4(i) County projects

 

5(A) Acquisition, construction,
6infrastructure and other related costs
7for a Federally Qualified Health
8Center-anchored multiservice facility

 

9Project Allocation

3,000,000

10(Base Project Allocation - $3,000,000)

 

11(ii) Mifflin County Industrial Development
12Authority

 

13(A) Acquisition, construction,
14rehabilitation and other costs related
15to design and construction of
16facilities to be utilized as branch
17campus of Pennsylvania Highlands
18Community College

 

19Project Allocation

600,000

20(Base Project Allocation - $600,000)

 

21(B) Acquisition, construction and other
22related costs for extension of public
23infrastructure within Mifflin County
24Industrial Park

 

25Project Allocation

1,000,000

26(Base Project Allocation - $1,000,000)

 

27(C) Demolition, remediation, renovations
28and infrastructure improvements to
29Mifflin County Industrial Development
30Corporation Plaza, a brownfield site

 

1located in Granville Township

 

2Project Allocation

1,250,000

3(Base Project Allocation - $1,250,000)

 

4(D) Construction, renovation,
5rehabilitation and other related costs
6for redevelopment and improvements for
7Mifflin County senior citizen housing
8units

 

9Project Allocation

3,000,000

10(Base Project Allocation - $3,000,000)

 

11(45) Monroe County

 

12(i) Barrett Township

 

13(A) Construction, infrastructure
14improvements and other costs related
15to Skytop restoration project

 

16Project Allocation

1,000,000

17(Base Project Allocation - $1,000,000)

 

18(ii) Bartonsville

 

19(A) Land acquisition, construction,
20infrastructure and other related costs
21for St. Luke's University Health
22Network development project

 

23Project Allocation

20,000,000

24(Base Project Allocation -
25$20,000,000)

 

<-26(iii) Coolbaugh and Tobyhanna Townships

 

27(A) Construction, infrastructure and
28other related costs for expansion of
29natural gas main from current
30connection in Arcadia North Business

 

1Park in Coolbaugh Township to
2Tobyhanna Township

 

3Project Allocation

5,000,000

4(Base Project Allocation - $5,000,000)

 

5(iv) Pocono Township

 

6(A) Construction, infrastructure and
7other related costs for expansion of
8natural gas service to center of
9Monroe County

 

10Project Allocation

5,000,000

11(Base Project Allocation - $5,000,000)

 

<-12(v) Stroudsburg Borough

 

13(A) Acquisition, construction,
14redevelopment and other related costs
15for new YMCA

 

16Project Allocation

8,000,000

17(Base Project Allocation - $8,000,000)

 

18(vi) Tunkhannock Township

 

19(A) Construction, renovation,
20infrastructure, utilities, structural
21and other related costs for facility
22improvements at the Pocono Raceway

 

23Project Allocation

15,000,000

24(Base Project Allocation -
25$15,000,000)

 

26(46) Montgomery County

 

27(i) County projects

 

28(A) Acquisition, infrastructure,
29construction and other related costs
30for renovation and expansion of

 

1Rosemont College's Cardinal Hall

 

2Project Allocation

2,500,000

3(Base Project Allocation - $2,500,000)

 

<-4(B) Rehabilitation of railroad, including
5track improvements, siding extensions,
6visitors centers, equipment and
7equipment maintenance facility,
8construction and related work to
9enhance economic development
10opportunities and preserve corridor
11for future freight traffic in Berks
12and Montgomery Counties

 

13Project Allocation

10,000,000

14(Base Project Allocation -
15$10,000,000)

 

16(ii) Redevelopment Authority of the County of
17Montgomery

 

18(A) Acquisition, infrastructure,
19construction, renovation and
20redevelopment of mill building located
21at Beech and Evans Streets in Borough
22of Pottstown

 

23Project Allocation

1,000,000

24(Base Project Allocation - $1,000,000)

 

25(B) Acquisition, infrastructure,
26construction, renovation and
27redevelopment of Empire Firehouse
28located at Franklin and Chestnut
29Streets in Borough of Pottstown

 

30Project Allocation

1,000,000

1(Base Project Allocation - $1,000,000)

 

2(C) Acquisition, infrastructure,
3construction and development of health
4complex on campus of Pottstown
5Memorial Medical Center in Borough of
6Pottstown

 

7Project Allocation

3,000,000

8(Base Project Allocation - $3,000,000)

 

9(D) Site preparation, infrastructure,
10construction and other related costs
11for construction and development of
12mixed-use commercial center at the
13intersection of Route 100 and Market
14Street in Douglas Township

 

15Project Allocation

4,000,000

16(Base Project Allocation - $4,000,000)

 

<-17(ii.1) Abington Township

 

18(A) Construction and other related costs
19for athletic league building

 

20Project Allocation

1,000,000

21(Base Project Allocation - $1,000,000)

 

22(B) Construction and other related costs
23for ambulatory services unit
24renovation

 

25Project Allocation

1,000,000

26(Base Project Allocation - $1,000,000)

 

27(C) Construction and other related costs
28for inpatient orthopedic unit project

 

29Project Allocation

2,188,000

30(Base Project Allocation - $2,188,000)

 

1(ii.2) Borough of Ambler

 

2(A) Infrastructure, redevelopment,
3construction and other related costs
4for parking garage on Lindenwold
5Avenue

 

6Project Allocation

1,700,000

7(Base Project Allocation - $1,700,000)

 

8(iii) Borough of Hatboro

 

9(A) Infrastructure, construction and
10other related costs for
11rehabilitation, expansion and
12modernization of borough facilities,
13including Borough Hall, police station
14and public works building

 

15Project Allocation

1,500,000

16(Base Project Allocation - $1,500,000)

 

<-17(B) Acquisition, infrastructure,
18preservation and other related costs
19for reuse of existing historic factory

 

20Project Allocation

2,500,000

21(Base Project Allocation - $2,500,000)

 

22(iv) Cheltenham Township

 

23(A) Construction, infrastructure
24improvements, including rehabilitation
25of sanitary sewer system, and other
26related costs for business development

 

27Project Allocation

6,000,000

28(Base Project Allocation - $6,000,000)

 

29(B) Construction, infrastructure
30improvements and other costs related

 

1to pedestrian signals and crossings

 

2Project Allocation

1,750,000

3(Base Project Allocation - $1,750,000)

 

4(C) Construction, infrastructure
5improvements and other costs related
6to Elkins Park West streetscape and
7transportation enhancement project

 

8Project Allocation

3,000,000

9(Base Project Allocation - $3,000,000)

 

10(D) Acquisition, infrastructure,
11construction and other related costs
12for relocation of Public Works
13facility

 

14Project Allocation

7,500,000

15(Base Project Allocation - $7,500,000)

 

<-16(E) Construction and other related costs
17for a fire station expansion project

 

18Project Allocation

225,000

19(Base Project Allocation - $225,000)

 

20(F) Acquisition, construction,
21redevelopment and other related costs
22for public works facility relocation

 

23Project Allocation

7,500,000

24(Base Project Allocation - $7,500,000)

 

25(G) Construction, infrastructure and
26other related costs for streetscape
27and other enhancements in Elkins Park
28West Commercial District

 

29Project Allocation

1,650,000

30(Base Project Allocation - $1,650,000)

 

1(H) Construction, infrastructure and
2other related costs for intersection
3improvements

 

4Project Allocation

875,000

5(Base Project Allocation - $875,000)

 

6(I) Construction, infrastructure and
7other related costs for projects
8related to sewer system

 

9Project Allocation

6,000,000

10(Base Project Allocation - $6,000,000)

 

11(J) Construction and other related costs
12for theatre and auditorium
13revitalization project

 

14Project Allocation

742,000

15(Base Project Allocation - $742,000)

 

16(K) Acquisition, construction and other
17related costs for redevelopment of
18former Tyler Estate and surrounding
19properties in Elkins Park

 

20Project Allocation

7,500,000

21(Base Project Allocation - $7,500,000)

 

22(L) Acquisition, construction,
23infrastructure and other costs related
24to Glenside area flood protection
25project

 

26Project Allocation

8,000,000

27(Base Project Allocation - $8,000,000)

 

28(M) Construction, infrastructure and
29other costs related to Glenside area
30flood protection project, Phase II, in

 

1Cheltenham Township along Tookany
2Creek

 

3Project Allocation

3,000,000

4(Base Project Allocation - $3,000,000)

 

5(N) Construction, infrastructure and
6other related costs for Tookany Creek
7headwaters flood control project

 

8Project Allocation

1,000,000

9(Base Project Allocation - $1,000,000)

 

10(v) Conshohocken Borough

 

11(A) Construction, infrastructure
12improvements and other costs related
13to Verizon Building remediation and
14adaptive reuse project

 

15Project Allocation

4,391,000

16(Base Project Allocation - $4,391,000)

 

17(B) Construction, infrastructure
18improvements and other costs related
19to Seven Tower Bridge development
20project

 

21Project Allocation

5,000,000

22(Base Project Allocation - $5,000,000)

 

<-23(C) Construction, infrastructure,
24redevelopment, abatement of hazardous
25materials and other related costs for
26redevelopment project at site of
27former Verizon building

 

28Project Allocation

3,821,000

29(Base Project Allocation - $3,821,000)

 

<-30(D) Construction, infrastructure,

 

1redevelopment and other related costs
2for development at First and Fayette
3Streets

 

4Project Allocation

10,000,000

5(Base Project Allocation -
6$10,000,000)

 

7(vi) East Norriton Township

 

8(A) Construction, infrastructure
9improvements and other costs related
10to renovation of patient rooms

 

11Project Allocation

2,000,000

12(Base Project Allocation - $2,000,000)

 

13(vii) Lower Gwynedd Township

 

14(A) Acquisition, infrastructure,
15construction and other related costs
16for Phase III of Bethlehem Pike
17revitalization project, including
18streetscape and safety improvements

 

19Project Allocation

500,000

20(Base Project Allocation - $500,000)

 

21(viii) Lower Merion Township

 

22(A) Construction, infrastructure
23improvements and other costs related
24to expansion of Ardmore Train Station
25transit and parking improvements
26project

 

27Project Allocation

10,000,000

28(Base Project Allocation -
29$10,000,000)

 

30(B) Construction, infrastructure

 

1improvements and other costs related
2to Rosemont College building
3renovations

 

4Project Allocation

5,000,000

5(Base Project Allocation - $5,000,000)

 

6(ix) Lower Providence Township

 

7(A) Infrastructure, construction and
8other related costs, including
9abatement of hazardous materials, for
10redevelopment of Rittenhouse Road CSG
11Superfund site located in Park Pointe
12at Lower Providence Business Park

 

13Project Allocation

2,500,000

14(Base Project Allocation - $2,500,000)

 

15(x) Montgomery Township

 

16(A) Infrastructure, redevelopment and
17construction of multipurpose
18recreational community center

 

19Project Allocation

5,000,000

20(Base Project Allocation - $5,000,000)

 

21(xi) Norristown Borough

 

22(A) Construction, infrastructure
23improvements and other costs related
24to new mixed-income development in
25downtown Norristown

 

26Project Allocation

1,500,000

27(Base Project Allocation - $1,500,000)

 

28(B) Construction, infrastructure
29improvements and renovations for the
30Elmwood Park Zoo Protect the Park

 

1project

 

2Project Allocation

750,000

3(Base Project Allocation - $750,000)

 

<-4(C) Construction, infrastructure,
5redevelopment, abatement of hazardous
6materials and other related costs for
7medical office building

 

8Project Allocation

5,000,000

9(Base Project Allocation - $5,000,000)

 

10(D) Acquisition, construction,
11infrastructure, redevelopment and
12other related costs for supermarket
13project on Markley Street

 

14Project Allocation

2,500,000

15(Base Project Allocation - $2,500,000)

 

<-16(E) Construction, infrastructure,
17redevelopment and other related costs
18for the George Washington Carver
19Community Center

 

20Project Allocation

2,000,000

21(Base Project Allocation - $2,000,000)

 

22(xi.1) Plymouth Township

 

23(A) Construction, infrastructure
24improvements and renovations for the
25East Plymouth Valley Park Little
26League facility

 

27Project Allocation

300,000

28(Base Project Allocation - $300,000)

 

29(xii) Springfield Township

 

30(A) Construction, infrastructure

 

1improvements and other costs related
2to Wordsworth Academy Fort Washington
3project

 

4Project Allocation

2,500,000

5(Base Project Allocation - $2,500,000)

 

6(xiii) Upper Dublin Township

 

7(A) Acquisition, renovation,
8infrastructure development, site
9preparation and construction to
10support redevelopment and
11revitalization of Fort Washington
12Office Park

 

13Project Allocation

10,000,000

14(Base Project Allocation -
15$10,000,000)

 

16(xiv) Upper Merion Township

 

17(A) Construction, infrastructure
18improvements and other costs related
19to DeKalb/Gulph redevelopment project

 

20Project Allocation

3,000,000

21(Base Project Allocation - $3,000,000)

 

<-22(B) Construction and other related costs
23for ambulance station project

 

24Project Allocation

900,000

25(Base Project Allocation - $900,000)

 

26(C) Construction, infrastructure,
27redevelopment and other related costs
28for senior center project

 

29Project Allocation

3,000,000

30(Base Project Allocation - $3,000,000)

 

<-1(D) Construction, infrastructure,
2redevelopment and other related costs
3for projects related to Triad
4commercial office facility in King of
5Prussia

 

6Project Allocation

3,000,000

7(Base Project Allocation - $3,000,000)

 

8(xv) Upper Moreland Township

 

9(A) Construction, infrastructure
10improvements and other related costs
11for Willow Grove Industrial Commons,
12including construction of regional
13storm water management basin to
14improve economic development of the
15area

 

16Project Allocation

500,000

17(Base Project Allocation - $500,000)

 

<-18(xvi) Upper Providence Township

 

19(A) Construction, infrastructure and
20other related costs for Montgomery
21County Pope John Paul II High School
22stadium project

 

23Project Allocation

500,000

24(Base Project Allocation - $500,000)

 

25(xvi) <-(xvii) Whitemarsh Township

 

26(A) Construction, infrastructure
27improvements and other costs related
28to AIM Institute for Learning and
29Research redevelopment and expansion
30project

 

1Project Allocation

3,500,000

2(Base Project Allocation - $3,500,000)

 

<-3(xviii) Whitpain Township

 

4(A) Construction, infrastructure and
5other related costs for renovation of
6Montgomery County Community College
7Science Center's west wing

 

8Project Allocation

1,500,000

9(Base Project Allocation - $1,500,000)

 

10(47) Montour County

 

11(i) (Reserved)

 

12(48) Northampton County

 

13(i) County projects

 

<-14(A) Acquisition, construction,
15infrastructure and other costs related
16to community-based outpatient health
17services facility

 

<-18(A) Acquisition, construction,
19infrastructure and other costs related
20to community-based outpatient health
21services facility for Lehigh Valley
22Health Network

 

23Project Allocation

8,000,000

24(Base Project Allocation - $8,000,000)

 

25(B) Acquisition, construction,
26infrastructure and other costs related
27to renovation of mixed-use buildings
28in urban areas

 

29Project Allocation

2,000,000

30(Base Project Allocation - $2,000,000)

 

1(C) Acquisition, construction,
2infrastructure and other costs related
3to warehouse facility project

 

4Project Allocation

5,000,000

5(Base Project Allocation - $5,000,000)

 

6(ii) Bethlehem Township

 

7(A) Construction, renovation and other
8related costs to expand and further
9develop St. Luke's Hospital Anderson
10Campus

 

11Project Allocation

20,000,000

12(Base Project Allocation -
13$20,000,000)

 

14(B) Site development and infrastructure
15improvements for Highland Avenue and
16Mowrer Drive industrial sites

 

17Project Allocation

500,000

18(Base Project Allocation - $500,000)

 

19(iii) City of Bethlehem

 

20(A) Construction, renovation,
21infrastructure and other related costs
22to ArtsQuest renovation project

 

23Project Allocation

1,000,000

24(Base Project Allocation - $1,000,000)

 

25(B) Acquisition, construction,
26infrastructure improvements and other
27costs for the development of a
28regional convention center and related
29improvements in the city

 

30Project Allocation

25,000,000

1(Base Project Allocation -
2$25,000,000)

 

<-3(C) Construction and other related costs
4for hotel and leisure training center

 

5Project Allocation

10,000,000

6(Base Project Allocation -
7$10,000,000)

 

8(D) Construction and other related costs
9for technology center

 

10Project Allocation

10,000,000

11(Base Project Allocation -
12$10,000,000)

 

13(iv) City of Easton

 

14(A) Acquisition, construction,
15infrastructure and other costs related
16to High School Sports Hall of Fame
17museum

 

18Project Allocation

5,000,000

19(Base Project Allocation - $5,000,000)

 

20(B) Acquisition, construction,
21infrastructure and other costs related
22to redevelopment of mixed-use
23building, including structured parking
24on Ferry Street

 

25Project Allocation

3,000,000

26(Base Project Allocation - $3,000,000)

 

27(C) Acquisition, construction,
28infrastructure and other costs related
29to redevelopment of mixed-use
30buildings, including parking and park

 

1infrastructure improvements to Centre
2Square

 

3Project Allocation

10,000,000

4(Base Project Allocation -
5$10,000,000)

 

6(D) Construction, infrastructure and
7other costs related to redevelopment
8of mixed-use commercial/office
9building with integrated parking and
10residential upper floor

 

11Project Allocation

1,156,000

12(Base Project Allocation - $1,156,000)

 

13(E) Acquisition, construction,
14infrastructure and other costs related
15to Marquis Commons project

 

16Project Allocation

2,000,000

17(Base Project Allocation - $2,000,000)

 

18(F) Acquisition and redevelopment of the
19Governor Wolf Building for mixed use

 

20Project Allocation

5,000,000

21(Base Project Allocation - $5,000,000)

 

<-22(G) Acquisition, construction,
23redevelopment and other related costs
24for a sports hall of fame museum

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(H) Construction, redevelopment and other
28related costs for Governor Wolf
29Building

 

30Project Allocation

2,000,000

1(Base Project Allocation - $2,000,000)

 

2(I) Acquisition, construction and other
3related costs for redevelopment of
4Ferry Street

 

5Project Allocation

3,000,000

6(Base Project Allocation - $3,000,000)

 

7(J) Acquisition, construction and other
8related costs for redevelopment of
9Centre Square

 

10Project Allocation

10,000,000

11(Base Project Allocation -
12$10,000,000)

 

13(v) East Allen Township

 

14(A) Infrastructure and related site costs
15for Shoppes at Route 512 and East
16Allen Marketplace renovation project

 

17Project Allocation

600,000

18(Base Project Allocation - $600,000)

 

<-19(B) Acquisition, construction,
20infrastructure and other related costs
21for municipal facility

 

22Project Allocation

785,000

23(Base Project Allocation - $785,000)

 

24(C) Renovation and rehabilitation of
25Weaversville Intensive Treatment Unit
26Facility for municipal services
27building

 

28Project Allocation

2,000,000

29(Base Project Allocation - $2,000,000)

 

30(D) Land acquisition, construction and

 

1other related costs for municipal
2facility

 

3Project Allocation

785,000

4(Base Project Allocation - $785,000)

 

5(vi) East Bangor Borough

 

6(A) Construction, infrastructure and
7other costs related to development of
8government center, heritage center and
9community disaster center

 

10Project Allocation

150,000

11(Base Project Allocation - $150,000)

 

<-12(vi.1) Freemansburg Borough

 

13(A) Construction, infrastructure and
14other related costs for fire,
15administration and public works
16department facilities

 

17Project Allocation

1,800,000

18(Base Project Allocation - $1,800,000)

 

19(vii) Hellertown Borough

 

20(A) Acquisition, construction,
21infrastructure and other costs related
22to rehabilitation of former Champion
23Spark Plug facility

 

24Project Allocation

2,500,000

25(Base Project Allocation - $2,500,000)

 

26(viii) Lower Nazareth

 

27(A) Acquisition, construction,
28infrastructure and other costs related
29to industrial park in Nazareth area

 

30Project Allocation

10,000,000

1(Base Project Allocation -
2$10,000,000)

 

3(ix) Portland Borough

 

4(A) Acquisition of land and construction
5of office building in Portland
6Industrial Park

 

7Project Allocation

4,500,000

8(Base Project Allocation - $4,500,000)

 

9(x) Upper Mt. Bethel Township

 

10(A) Acquisition, construction,
11infrastructure and other costs related
12to industrial park project

 

13Project Allocation

10,000,000

14(Base Project Allocation -
15$10,000,000)

 

16(B) Acquisition of land and construction
17of office building in Portland
18Industrial Park

 

19Project Allocation

4,500,000

20(Base Project Allocation - $4,500,000)

 

21(49) Northumberland County

 

22(i) County projects

 

23(A) Redevelopment and other costs related
24to construction of state-of-the-art
25carbon processing facility located at
26Shamokin Carbons

 

27Project Allocation

5,000,000

28(Base Project Allocation - $5,000,000)

 

29(ii) Northumberland County Industrial
30Development Authority

 

1(A) Infrastructure, renovation,
2construction and other related costs
3for expansion of Strong Industries
4manufacturing facility

 

5Project Allocation

3,000,000

6(Base Project Allocation - $3,000,000)

 

7(iii) Ci<-ty of Sunbury

 

8(A) Acquisition, construction,
9infrastructure, development and other
10costs related to redevelopment of
11former industrial site for new and
12expanding businesses

 

13Project Allocation

4,000,000

14(Base Project Allocation - $4,000,000)

 

15(50) Perry County

 

16(i) (Reserved)

 

17(51) Philadelphia County

 

18(i) County projects

 

19(A) Renovation of biology labs and
20associated prep rooms at Community
21College of Philadelphia's main campus
22and West Regional Center

 

23Project Allocation

2,000,000

24(Base Project Allocation - $2,000,000)

 

25(B) Land acquisition, construction,
26infrastructure and other related costs
27for design and construction of
28National Native American Museum

 

29Project Allocation

15,000,000

30(Base Project Allocation -

 

1$15,000,000)

 

2(C) Construction, infrastructure
3improvements and related costs for the
4development of a museum

 

5Project Allocation

50,000,000

6(Base Project Allocation -
7$50,000,000)

 

<-8(D) Infrastructure in support of downtown
9highrise office and hotel development,
10reconstruction of public streets and
11sidewalks and expanded connections to
12existing mass transit system

 

13Project Allocation

30,000,000

14(Base Project Allocation -
15$30,000,000)

 

16(E) Acquisition, construction,
17reconstruction, rehabilitation,
18remediation, infrastructure
19improvements, including improvements
20related to parking and common areas,
21and other related costs for
22redevelopment and reuse of Building 22
23located at former Philadelphia Naval
24Yard

 

25Project Allocation

20,000,000

26(Base Project Allocation -
27$20,000,000)

 

28(F) Acquisition, construction,
29reconstruction, rehabilitation,
30remediation, infrastructure

 

1improvements, including improvements
2related to parking and common areas,
3and other related costs for
4redevelopment and reuse of Building 18
5located at former Philadelphia Naval
6Yard

 

7Project Allocation

20,000,000

8(Base Project Allocation -
9$20,000,000)

 

10(G) Acquisition, construction,
11reconstruction, rehabilitation,
12remediation, infrastructure
13improvements, including improvements
14related to parking and common areas,
15and other related costs for
16redevelopment and reuse of Building 16
17located at former Philadelphia Naval
18Yard

 

19Project Allocation

20,000,000

20(Base Project Allocation -
21$20,000,000)

 

22(H) Acquisition, construction,
23reconstruction, rehabilitation,
24remediation, infrastructure
25improvements, including improvements
26related to parking and common areas,
27and other related costs for
28redevelopment and reuse of Building 19
29located at former Philadelphia Naval
30Yard

 

1Project Allocation

20,000,000

2(Base Project Allocation -
3$20,000,000)

 

4(I) Acquisition, construction,
5reconstruction, rehabilitation,
6remediation, infrastructure
7improvements, including improvements
8related to parking and common areas,
9and other related costs for
10redevelopment and reuse of Building 17
11located at former Philadelphia Naval
12Yard

 

13Project Allocation

20,000,000

14(Base Project Allocation -
15$20,000,000)

 

16(J) Construction, redevelopme<-nt,
17infrastructure and other related costs
18for Woodmere Art Museum construction
19and expansion project

 

20Project Allocation

6,100,000

21(Base Project Allocation - $6,100,000)

 

22(K) Acquisition, construction,
23infrastructure and other related costs
24for an economic development project

 

25Project Allocation

100,000,000

26(Base Project Allocation -
27$100,000,000)

 

28(L) Construction, developme<-nt,
29rehabilitation, infrastructure
30improvements, environmental

 

1remediation, renovation,
2beautification, pedestrian
3accessibility improvements, enhanced
4security improvements and other
5related costs to revitalize the 40th
6Street Trolley Portal

 

7Project Allocation

1,000,000

8(Base Project Allocation - $1,000,000)

 

9(ii) City of Philadelphia

 

10(A) Construction, infrastructure,
11rehabilitation improvements and other
12costs related to Moore College of Art
13& Design project

 

14Project Allocation

4,000,000

15(Base Project Allocation - $4,000,000)

 

16(B) Construction and other related costs
17for Cascia Center of the National
18Shrine of Saint Rita project

 

19Project Allocation

1,000,000

20(Base Project Allocation - $1,000,000)

 

21(C) Construction, infrastructure and
22other costs related to Hotel Indigo
23project

 

24Project Allocation

35,000,000

25(Base Project Allocation -
26$35,000,000)

 

27(D) Construction, infrastructure and
28other costs related to Reading Viaduct
29project

 

30Project Allocation

3,500,000

1(Base Project Allocation - $3,500,000)

 

2(E) Construction, infrastructure and
3other costs related to Penn Treaty
4Village project

 

5Project Allocation

55,000,000

6(Base Project Allocation -
7$55,000,000)

 

8(F) For building, gallery, exhibit and
9site restoration, renovation,
10construction, infrastructure and
11technology upgrades at Franklin
12Institute

 

13Project Allocation

25,000,000

14(Base Project Allocation -
15$25,000,000)

 

16(G) Construction, infrastructure and
17other related costs for Russell Byers
18Charter School expansion project

 

19Project Allocation

3,125,000

20(Base Project Allocation - $3,125,000)

 

21(H) Construction, infrastructure and
22other costs related to Live Arts
23Festival and Philly Fringe Arts Center
24project

 

25Project Allocation

500,000

26(Base Project Allocation - $500,000)

 

27(I) Construction, infrastructure and
28other costs related to Convention
29Center Hotel mixed-use project

 

30Project Allocation

30,000,000

1(Base Project Allocation -
2$30,000,000)

 

3(J) Construction, infrastructure and
4other costs related to Proto Brewery
5Hotel project

 

6Project Allocation

5,000,000

7(Base Project Allocation - $5,000,000)

 

8(K) Construction, infrastructure and
9other costs related to Stables
10redevelopment project

 

11Project Allocation

3,000,000

12(Base Project Allocation - $3,000,000)

 

13(L) Construction, infrastructure and
14other costs related to Tulip Street
15redevelopment project

 

16Project Allocation

500,000

17(Base Project Allocation - $500,000)

 

18(M) Construction, infrastructure and
19other costs related to Columbia Street
20redevelopment project

 

21Project Allocation

1,000,000

22(Base Project Allocation - $1,000,000)

 

23(N) Acquisition, construction,
24infrastructure and other costs related
25to 1010 Avenue of the Arts New
26Headquarters Campus Civic Culture Hub
27project

 

28Project Allocation

8,000,000

29(Base Project Allocation - $8,000,000)

 

30(O) Construction, infrastructure and

 

1other costs related to Pro-Square
2Kingsessing Nursing Home project

 

3Project Allocation

7,500,000

4(Base Project Allocation - $7,500,000)

 

5(P) Redevelopment, construction,
6infrastructure and other costs related
7to Jasper Street Manufacturing
8Facility project

 

9Project Allocation

1,250,000

10(Base Project Allocation - $1,250,000)

 

11(Q) Redevelopment, construction,
12infrastructure and other costs related
13to AC Linen Laundry commercial project

 

14Project Allocation

5,000,000

15(Base Project Allocation - $5,000,000)

 

16(R) Redevelopment, construction,
17infrastructure and other costs related
18to Convention Center Hotel project at
1915th and Race Streets

 

20Project Allocation

30,000,000

21(Base Project Allocation -
22$30,000,000)

 

23(S) Facilities construction,
24infrastructure, storm water management
25and restoration of tidal wetland for
26Penn Treaty Park Phase I project

 

27Project Allocation

10,000,000

28(Base Project Allocation -
29$10,000,000)

 

30(T) Facilities construction,

 

1infrastructure, renovations and other
2costs related to Franklin Delano
3Roosevelt Park

 

4Project Allocation

10,000,000

5(Base Project Allocation -
6$10,000,000)

 

7(U) Construction, infrastructure and
8other costs related to Salvation Army
9Eliza Shirley Campus project

 

10Project Allocation

1,750,000

11(Base Project Allocation - $1,750,000)

 

12(V) Acquisition, construction,
13infrastructure and other costs related
14to KIPP Philadelphia School project

 

15Project Allocation

3,500,000

16(Base Project Allocation - $3,500,000)

 

17(W) Construction, infrastructure and
18other costs related to East Falls
19streetscape project

 

20Project Allocation

2,500,000

21(Base Project Allocation - $2,500,000)

 

22(X) Construction, infrastructure and
23other costs related to Eastern
24Pennsylvania Psychiatric Institute
25redevelopment project

 

26Project Allocation

5,000,000

27(Base Project Allocation - $5,000,000)

 

28(Y) Construction, demolition,
29acquisition, infrastructure,
30redevelopment and other related costs

 

1for campus improvements and facilities
2expansion at Philadelphia University

 

3Project Allocation

20,000,000

4(Base Project Allocation -
5$20,000,000)

 

6(Z) Acquisition, construction,
7infrastructure and other costs related
8to Women's Domestic Violence Shelter
9residential and commercial facility
10project

 

11Project Allocation

5,000,000

12(Base Project Allocation - $5,000,000)

 

13(AA) Acquisition, construction,
14infrastructure and other costs related
15to Free Library of Philadelphia George
16Institute renovation and building
17project

 

18Project Allocation

3,000,000

19(Base Project Allocation - $3,000,000)

 

20(BB) Construction, infrastructure and
21other costs related to University City
22Science Center build-out project

 

23Project Allocation

5,000,000

24(Base Project Allocation - $5,000,000)

 

25(CC) Construction, infrastructure,
26renovations and other costs for Please
27Touch Museum restoration project

 

28Project Allocation

1,500,000

29(Base Project Allocation - $1,500,000)

 

30(DD) Acquisition, clearing, demolition,

 

1renovation, environmental remediation,
2construction, infrastructure, design,
3streets, utilities and other costs
4associated with development of
5Innovation Neighborhood by Drexel
6University

 

7Project Allocation

30,000,000

8(Base Project Allocation -
9$30,000,000)

 

10(EE) Construction, infrastructure,
11renovations and other costs for
12Gaudenzia Foundation Family Center

 

13Project Allocation

4,500,000

14(Base Project Allocation - $4,500,000)

 

15(FF) Construction, infrastructure,
16renovations and other costs for North
17Philadelphia Health System St.
18Joseph's Hospital & Girard Medical
19Center

 

20Project Allocation

7,500,000

21(Base Project Allocation - $7,500,000)

 

22(GG) Infrastructure improvements,
23including electrical and technology
24upgrades for Holy Family University

 

25Project Allocation

1,000,000

26(Base Project Allocation - $1,000,000)

 

27(HH) Construction, infrastructure,
28renovations and other costs for Holy
29Family University Marian Hall project

 

30Project Allocation

5,000,000

1(Base Project Allocation - $5,000,000)

 

2(II) Construction, infrastructure,
3renovations and other costs for
4revitalization of former Frankford
5Arsenal as Shopping Center at the
6ARSENAL

 

7Project Allocation

2,500,000

8(Base Project Allocation - $2,500,000)

 

9(JJ) Construction, infrastructure and
10other costs related to plant upgrades
11at S. D. Richman Sons, Inc., facility
12for automobile shredder project in
13Port Richmond

 

14Project Allocation

5,000,000

15(Base Project Allocation - $5,000,000)

 

16(KK) Construction, infrastructure,
17renovations and other costs for Fox
18Chase Cancer Center Comparative
19Medical Research Facility

 

20Project Allocation

8,000,000

21(Base Project Allocation - $8,000,000)

 

22(LL) Construction, infrastructure and
23other costs related to Fox Chase
24Cancer Center physicians office
25building project

 

26Project Allocation

8,000,000

27(Base Project Allocation - $8,000,000)

 

28(MM) Construction, infrastructure and
29other costs related to Fox Chase
30Cancer Center Outpatient Chemotherapy

 

1Infusion Center

 

2Project Allocation

3,000,000

3(Base Project Allocation - $3,000,000)

 

4(NN) Construction, infrastructure,
5renovations and other costs for Fox
6Chase Cancer Center Laboratory
7Research and shared resource
8facilities

 

9Project Allocation

7,000,000

10(Base Project Allocation - $7,000,000)

 

11(OO) Construction, infrastructure,
12renovations and other costs for Fox
13Chase Cancer Center Conference Center

 

14Project Allocation

1,500,000

15(Base Project Allocation - $1,500,000)

 

16(PP) Construction, infrastructure,
17renovations and other costs for Fox
18Chase Cancer Center central utility
19plant upgrades

 

20Project Allocation

4,000,000

21(Base Project Allocation - $4,000,000)

 

22(QQ) Demolition, acquisition,
23construction, infrastructure and other
24costs for Liddonfield revitalization,
25renovation and rehabilitation project

 

26Project Allocation

35,000,000

27(Base Project Allocation -
28$35,000,000)

 

29(RR) Construction, infrastructure,
30renovations and other costs for

 

1Independence Visitor Center service
2desk improvement project

 

3Project Allocation

500,000

4(Base Project Allocation - $500,000)

 

5(SS) Acquisition, construction,
6infrastructure improvements and other
7costs related to Parkwood Therapeutic
8Riding Center expansion and
9revitalization project

 

10Project Allocation

1,500,000

11(Base Project Allocation - $1,500,000)

 

12(TT) Acquisition, construction,
13infrastructure improvements and other
14costs related to Bustleton Bengals
15Gymnasium

 

16Project Allocation

750,000

17(Base Project Allocation - $750,000)

 

18(UU) Acquisition, construction,
19infrastructure improvements and other
20costs related to manufacturing
21facility near intersection of Comly
22Road and Roosevelt Boulevard in
23Northeast Philadelphia

 

24Project Allocation

2,500,000

25(Base Project Allocation - $2,500,000)

 

26(VV) Construction, infrastructure and
27other costs related to Methodist Home
28for Children incubator/shared kitchen
29program

 

30Project Allocation

500,000

1(Base Project Allocation - $500,000)

 

2(WW) Construction, infrastructure and
3other costs related to West 59th and
4Market Streets mixed-use, transit-
5oriented development project

 

6Project Allocation

2,000,000

7(Base Project Allocation - $2,000,000)

 

8(XX) Acquisition, construction,
9infrastructure, redevelopment and
10other costs related to Green Tree
11School development project

 

12Project Allocation

1,000,000

13(Base Project Allocation - $1,000,000)

 

14(YY) Construction, infrastructure and
15other costs related to Schuylkill
16Crossing at Grays Ferry redevelopment
17project

 

18Project Allocation

6,000,000

19(Base Project Allocation - $6,000,000)

 

20(ZZ) Construction, infrastructure and
21other costs related to Wistar
22Institute administrative operations
23space retrofit project

 

24Project Allocation

1,500,000

25(Base Project Allocation - $1,500,000)

 

26(AAA) Construction, infrastructure and
27other costs related to Wistar
28Institute class A laboratory
29conversion project

 

30Project Allocation

1,600,000

1(Base Project Allocation - $1,600,000)

 

2(BBB) Construction, infrastructure and
3other costs related to Boys' Latin of
4Philadelphia Charter School Middle
5School building project

 

6Project Allocation

700,000

7(Base Project Allocation - $700,000)

 

8(CCC) Acquisition, infrastructure,
9construction, redevelopment and other
10related costs for Greater Philadelphia
11Health Action

 

12Project Allocation

10,000,000

13(Base Project Allocation -
14$10,000,000)

 

15(DDD) Acquisition, infrastructure,
16construction, redevelopment and other
17related costs for Wynnefield
18Multipurpose Center

 

19Project Allocation

1,500,000

20(Base Project Allocation - $1,500,000)

 

21(EEE) Construction, infrastructure and
22other costs related to medical
23education center at University of
24Pennsylvania Perelman School of
25Medicine

 

26Project Allocation

15,000,000

27(Base Project Allocation -
28$15,000,000)

 

29(FFF) Construction, infrastructure and
30other costs related to University of

 

1Pennsylvania's Walnut Street Gateway
2streetscape project

 

3Project Allocation

1,500,000

4(Base Project Allocation - $1,500,000)

 

5(GGG) Construction, infrastructure and
6other costs related to Wynne Ballroom
7redevelopment mixed-use facility
8project

 

9Project Allocation

200,000

10(Base Project Allocation - $200,000)

 

11(HHH) Construction, infrastructure and
12other costs related to Magee
13Rehabilitation Hospital improvement
14project

 

15Project Allocation

500,000

16(Base Project Allocation - $500,000)

 

17(III) Construction, infrastructure and
18other costs related to El Centro de
19Oro Market project

 

20Project Allocation

750,000

21(Base Project Allocation - $750,000)

 

22(JJJ) Acquisition, infrastructure,
23construction, redevelopment and other
24related costs for Nueva Esperanza
25North 5th Street redevelopment

 

26Project Allocation

3,000,000

27(Base Project Allocation - $3,000,000)

 

28(KKK) Acquisition, infrastructure,
29demolition, construction,
30redevelopment and other related costs

 

1for Nueva Esperanza commercial/retail
2business redevelopment project

 

3Project Allocation

3,000,000

4(Base Project Allocation - $3,000,000)

 

5(LLL) Construction, infrastructure and
6other costs related to revitalization
7of 1711 West Allegheny Avenue

 

8Project Allocation

500,000

9(Base Project Allocation - $500,000)

 

10(MMM) Acquisition, infrastructure,
11demolition, construction,
12redevelopment and other related costs
13for Plaza Allegheny mixed-use
14commercial retail shopping center in
15Fairhill

 

16Project Allocation

4,000,000

17(Base Project Allocation - $4,000,000)

 

18(NNN) Construction, infrastructure and
19other development costs for emergency,
20inpatient, outpatient and clinical
21facilities for Temple University
22Hospital

 

23Project Allocation

10,000,000

24(Base Project Allocation -
25$10,000,000)

 

26(OOO) Construction, infrastructure and
27other costs related to University of
28Pennsylvania South Bank commercial
29office and research park redevelopment
30project

 

1Project Allocation

2,300,000

2(Base Project Allocation - $2,300,000)

 

3(PPP) Construction, infrastructure and
4other costs related to renovation and
5improvement of North City Congress
6Senior Community Center

 

7Project Allocation

1,000,000

8(Base Project Allocation - $1,000,000)

 

9(QQQ) Acquisition, construction,
10infrastructure and other costs related
11to North City Congress Community
12Center facility project

 

13Project Allocation

3,000,000

14(Base Project Allocation - $3,000,000)

 

15(RRR) Construction, infrastructure and
16other costs related to Smith Memorial
17Playhouse Restoration IV and Gateway
18Project

 

19Project Allocation

5,000,000

20(Base Project Allocation - $5,000,000)

 

21(SSS) Acquisition, construction,
22infrastructure and other costs related
23to Chariot Landing-International Row
24mixed-use revitalization project

 

25Project Allocation

40,000,000

26(Base Project Allocation -
27$40,000,000)

 

28(TTT) Acquisition, construction,
29infrastructure and development of
30mixed-use Civil Justice Center campus,

 

1including commercial office space for
2leading legal service organizations

 

3Project Allocation

6,000,000

4(Base Project Allocation - $6,000,000)

 

5(UUU) Acquisition, construction,
6infrastructure, redevelopment and
7other related costs for facilities to
8deliver medical services, conduct
9research or provide other related
10activities for Magee Rehabilitation
11Hospital

 

12Project Allocation

15,000,000

13(Base Project Allocation -
14$15,000,000)

 

15(VVV) Construction, infrastructure and
16other costs related to FDR Park
17Boathouse Cescaphe Ballroom adaptive
18reuse project

 

19Project Allocation

750,000

20(Base Project Allocation - $750,000)

 

21(WWW) Construction, infrastructure and
22other costs related to Old City
23District streetscape improvement
24project

 

25Project Allocation

500,000

26(Base Project Allocation - $500,000)

 

27(XXX) Acquisition, construction,
28infrastructure, redevelopment and
29other related costs for 1010 Avenue of
30the Arts New Headquarters Campus/Civic

 

1Culture Hub

 

2Project Allocation

8,000,000

3(Base Project Allocation - $8,000,000)

 

4(YYY) Construction, infrastructure and
5other costs related to WHYY facilities
6upgrade project

 

7Project Allocation

500,000

8(Base Project Allocation - $500,000)

 

9(ZZZ) Acquisition, construction,
10infrastructure, redevelopment and
11other related costs for Friends Select
12School renovation project

 

13Project Allocation

2,000,000

14(Base Project Allocation - $2,000,000)

 

15(AAAA) Construction, site preparation,
16expansion and infrastructure-related
17costs and construction of Chestnut
18Hill College campus academic center
19facility

 

20Project Allocation

10,000,000

21(Base Project Allocation -
22$10,000,000)

 

23(BBBB) Construction, infrastructure,
24renovations and other costs for
25National Constitution Center

 

26Project Allocation

30,000,000

27(Base Project Allocation -
28$30,000,000)

 

29(CCCC) Construction, infrastructure,
30renovations and other costs for museum

 

1administration building at Eastern
2State Penitentiary Historic Site

 

3Project Allocation

6,500,000

4(Base Project Allocation - $6,500,000)

 

5(DDDD) Construction, infrastructure,
6renovations and other costs for
7interior and exterior improvements at
8Eastern State Penitentiary Historic
9Site

 

10Project Allocation

3,100,000

11(Base Project Allocation - $3,100,000)

 

12(EEEE) Acquisition, construction,
13infrastructure, redevelopment and
14other related costs for 900 North
15Broad Street project

 

16Project Allocation

4,500,000

17(Base Project Allocation - $4,500,000)

 

18(FFFF) Acquisition, construction,
19infrastructure and other related costs
20for Divine Lorraine property
21redevelopment project

 

22Project Allocation

7,500,000

23(Base Project Allocation - $7,500,000)

 

24(GGGG) Acquisition, construction,
25infrastructure and other related costs
26for redevelopment of Stutz property at
27666-667 North Broad Street, 1360-64
28Ridge Avenue and 1319 Wallace Street

 

29Project Allocation

5,000,000

30(Base Project Allocation - $5,000,000)

 

1(HHHH) Acquisition, construction,
2infrastructure and other related costs
3for redevelopment of Stevens property
4at 523 North Broad Street

 

5Project Allocation

6,000,000

6(Base Project Allocation - $6,000,000)

 

7(IIII) Acquisition, construction,
8infrastructure and other related costs
9for redevelopment of Metropolitan
10Opera House

 

11Project Allocation

3,000,000

12(Base Project Allocation - $3,000,000)

 

13(JJJJ) Acquisition, construction,
14infrastructure and other related costs
15for redevelopment of Benjamin Franklin
16High School property

 

17Project Allocation

12,000,000

18(Base Project Allocation -
19$12,000,000)

 

20(KKKK) Acquisition, construction,
21infrastructure and other related costs
22for redevelopment of Parkway Center
23City High School property

 

24Project Allocation

6,000,000

25(Base Project Allocation - $6,000,000)

 

26(LLLL) Acquisition, construction,
27infrastructure and other related costs
28for redevelopment of Julia R.
29Masterman High School property

 

30Project Allocation

8,000,000

1(Base Project Allocation - $8,000,000)

 

2(MMMM) Acquisition, construction,
3infrastructure and other related costs
4for redevelopment of Franklin Learning
5Center property at 616 North 15th
6Street

 

7Project Allocation

7,500,000

8(Base Project Allocation - $7,500,000)

 

9(NNNN) Acquisition, construction,
10infrastructure and other related costs
11for redevelopment of William Penn High
12School property at 1333 North Broad
13Street

 

14Project Allocation

20,000,000

15(Base Project Allocation -
16$20,000,000)

 

17(OOOO) Acquisition, construction,
18infrastructure and other related costs
19for redevelopment of North Broad
20Street Salvation Army property at 701
21North Broad Street

 

22Project Allocation

10,000,000

23(Base Project Allocation -
24$10,000,000)

 

25(PPPP) Acquisition, construction,
26infrastructure, redevelopment and
27other costs related to Greene Street
28Friends School expansion project

 

29Project Allocation

2,000,000

30(Base Project Allocation - $2,000,000)

 

1(QQQQ) Construction, infrastructure and
2other costs related to the renovation
3of SHARE Food Program facility

 

4Project Allocation

2,000,000

5(Base Project Allocation - $2,000,000)

 

6(RRRR) Construction, infrastructure and
7other costs related to the SoKo site
8in Old Kensington/Northern Liberties
9neighborhood

 

10Project Allocation

4,500,000

11(Base Project Allocation - $4,500,000)

 

12(SSSS) Acquisition, infrastructure,
13construction and other related costs
14for 30 University Place project

 

15Project Allocation

6,500,000

16(Base Project Allocation - $6,500,000)

 

17(TTTT) Acquisition, infrastructure,
18construction, redevelopment and other
19related costs for Public Health
20Management Corporation

 

21Project Allocation

10,000,000

22(Base Project Allocation -
23$10,000,000)

 

24(UUUU) Acquisition, infrastructure,
25construction, redevelopment and other
26related costs for St. Francis Villa
27housing project

 

28Project Allocation

1,000,000

29(Base Project Allocation - $1,000,000)

 

30(VVVV) Construction, infrastructure and

 

1other related costs for the renovation
2and modernization of the Center in the
3Park senior community center Internet
4cafe project

 

5Project Allocation

250,000

6(Base Project Allocation - $250,000)

 

7(WWWW) Construction, renovation,
8infrastructure and other related costs
9for the Kimmel Center for the
10Performing Arts

 

11Project Allocation

10,000,000

12(Base Project Allocation -
13$10,000,000)

 

14(XXXX) Acquisition, construction,
15infrastructure improvements and other
16related costs for the renovation of
17the Mazzoni Center Facility and
18Medical Practice

 

19Project Allocation

6,000,000

20(Base Project Allocation - $6,000,000)

 

21(YYYY) Acquisition, construction,
22infrastructure improvements and other
23related costs for the redevelopment of
24an existing warehouse facility at the
25intersection of Tulip and Harbison
26Streets in Wissinoming

 

27Project Allocation

5,000,000

28(Base Project Allocation - $5,000,000)

 

29(ZZZZ) Construction of the Chinatown
30Community Center and acquisition,

 

1infrastructure improvements and
2renovation of the Chinatown retail
3area

 

4Project Allocation

5,000,000

5(Base Project Allocation - $5,000,000)

 

6(A5) Construction, renovation,
7infrastructure and other related costs
8for the West Philadelphia Branch YMCA
9Wellness/Fitness Center and family
10changing area expansion

 

11Project Allocation

2,000,000

12(Base Project Allocation - $2,000,000)

 

13(B5) Construction, renovation,
14infrastructure and other related costs
15for the Park Towne Place redevelopment
16project

 

17Project Allocation

5,000,000

18(Base Project Allocation - $5,000,000)

 

19(C5) Construction, rehabilitation,
20infrastructure and other related costs
21for the Historical Society of
22Pennsylvania's Center for History and
23Learning Phase II retrofitting and
24renovation project

 

25Project Allocation

2,500,000

26(Base Project Allocation - $2,500,000)

 

27(D5) Construction, rehabilitation,
28infrastructure and other related costs
29for the Historical Society of
30Pennsylvania's Center for History and

 

1Learning Phase II renovation and space
2addition project

 

3Project Allocation

13,500,000

4(Base Project Allocation -
5$13,500,000)

 

6(E5) Construction, infrastructure and
7other related costs for the 4.0
8University Place project

 

9Project Allocation

20,000,000

10(Base Project Allocation -
11$20,000,000)

 

12(F5) Construction and infrastructure
13improvements for Goodwill Industries
14store and training center at 5050
15Parkside Avenue

 

16Project Allocation

1,000,000

17(Base Project Allocation - $1,000,000)

 

18(G5) Construction, renovation and
19infrastructure improvements for Nueva
20Esperanza Facilities

 

21Project Allocation

4,800,000

22(Base Project Allocation - $4,800,000)

 

23(H5) Acquisition, construction,
24infrastructure improvements and other
25costs related to the 52nd Street
26Gateway Phase I mixed-use building
27project

 

28Project Allocation

1,000,000

29(Base Project Allocation - $1,000,000)

 

30(I5) Acquisition, construction,

 

1infrastructure improvements and other
2costs related to the 52nd Street
3Gateway Phase II Lifelong Learning
4Center project

 

5Project Allocation

1,300,000

6(Base Project Allocation - $1,300,000)

 

7(J5) Acquisition, construction,
8infrastructure improvements and other
9costs related to the 52nd Street
10Gateway Phase III transit center
11project

 

12Project Allocation

3,700,000

13(Base Project Allocation - $3,700,000)

 

14(K5) Acquisition, construction,
15infrastructure improvements and other
16related costs for 52nd Street mixed-
17use development project

 

18Project Allocation

10,000,000

19(Base Project Allocation -
20$10,000,000)

 

21(L5) Acquisition, construction,
22infrastructure improvements and other
23related costs for Inglis housing and
24long-term care facility development
25project

 

26Project Allocation

10,000,000

27(Base Project Allocation -
28$10,000,000)

 

29(M5) Acquisition, construction,
30infrastructure improvements and other

 

1related costs for Strawberry Mansion
2housing development project

 

3Project Allocation

10,000,000

4(Base Project Allocation -
5$10,000,000)

 

6(N5) Construction, infrastructure
7improvements and related costs for the
8Ligouri Academy renovation project

 

9Project Allocation

2,000,000

10(Base Project Allocation - $2,000,000)

 

11(O5) Construction, infrastructure
12improvements and related costs for the
13Brown's Superstores redevelopment
14project at North Broad and Spring
15Garden Streets

 

16Project Allocation

8,000,000

17(Base Project Allocation - $8,000,000)

 

18(P5) Construction, infrastructure
19improvements and related costs for the
20Brown's redevelopment project at 70th
21and Elmwood

 

22Project Allocation

12,000,000

23(Base Project Allocation -
24$12,000,000)

 

25(Q5) Construction, infrastructure
26improvements and related costs for the
27Brown's Superstores redevelopment
28project at the 24th and Oregon
29Shopping Center

 

30Project Allocation

8,000,000

1(Base Project Allocation - $8,000,000)

 

2(R5) Construction, infrastructure
3improvements and related costs for the
4Brown's Superstores redevelopment
5project at the PriceRite of Erie
6Avenue shopping center

 

7Project Allocation

5,000,000

8(Base Project Allocation - $5,000,000)

 

9(S5) Construction, infrastructure
10improvements and related costs for the
11Brown's Superstores redevelopment
12project at the PriceRite of Mantua
13shopping center

 

14Project Allocation

4,000,000

15(Base Project Allocation - $4,000,000)

 

16(T5) Acquisition, demolition,
17construction, renovation,
18infrastructure and other related costs
19for Thomas Jefferson University
20projects

 

21Project Allocation

25,000,000

22(Base Project Allocation -
23$25,000,000)

 

24(U5) Acquisition, infrastructure and
25other capital improvements for the
26Wordsworth Ford Road project

 

27Project Allocation

2,500,000

28(Base Project Allocation - $2,500,000)

 

<-29(V5) Construction, infrastructure and
30other related costs for expansion

 

1project at Philadelphia Freedom Valley
2YMCA West Philadelphia branch

 

3Project Allocation

2,000,000

4(Base Project Allocation - $2,000,000)

 

5(W5) Construction, infrastructure and
6other related costs for development of
7multiuse facility for Temple
8University athletics, academics and
9research and local community athletic
10events

 

11Project Allocation

30,000,000

12(Base Project Allocation -
13$30,000,000)

 

14(X5) Acquisition, construction,
15infrastructure, redevelopment and
16other related costs for redevelopment
17project at Island Avenue and Bartram
18Avenue

 

19Project Allocation

4,000,000

20(Base Project Allocation - $4,000,000)

 

21(Y5) Acquisition, construction,
22infrastructure, redevelopment,
23abatement of hazardous materials and
24other related costs for Gateway
25Marriott Hotel and related amenities
26in the vicinity of Island Avenue and
27Bartram Avenue intersection

 

28Project Allocation

4,000,000

29(Base Project Allocation - $4,000,000)

 

30(Z5) Acquisition, construction,

 

1infrastructure, redevelopment,
2abatement of hazardous materials and
3other related costs for 52nd Street
4Gateway Phase I project

 

5Project Allocation

1,000,000

6(Base Project Allocation - $1,000,000)

 

7(A6) Acquisition, construction,
8infrastructure, redevelopment,
9abatement of hazardous materials and
10other related costs for 52nd Street
11Gateway Phase II project

 

12Project Allocation

1,300,000

13(Base Project Allocation - $1,300,000)

 

14(B6) Acquisition, construction,
15infrastructure, redevelopment,
16abatement of hazardous materials and
17other related costs for 52nd Street
18Gateway Phase III project

 

19Project Allocation

3,700,000

20(Base Project Allocation - $3,700,000)

 

21(C6) Acquisition, construction,
22redevelopment and other related costs
23for projects as 900 North Broad Street

 

24Project Allocation

4,500,000

25(Base Project Allocation - $4,500,000)

 

26(D6) Construction, infrastructure,
27redevelopment and other related costs
28for ASPIRA school expansion projects

 

29Project Allocation

5,000,000

30(Base Project Allocation - $5,000,000)

 

1(E6) Construction and other related costs
2for community center on Old York Road

 

3Project Allocation

500,000

4(Base Project Allocation - $500,000)

 

5(F6) Acquisition, construction,
6redevelopment and other related costs
7for projects at site of Benjamin
8Franklin High School

 

9Project Allocation

12,000,000

10(Base Project Allocation -
11$12,000,000)

 

12(G6) Construction, infrastructure,
13redevelopment, abatement of hazardous
14materials and other related costs for
15site of Beury Building on North Broad
16Street

 

17Project Allocation

6,000,000

18(Base Project Allocation - $6,000,000)

 

19(H6) Acquisition, construction,
20infrastructure, redevelopment,
21abatement of hazardous materials and
22other related costs for Building 16
23project at former Philadelphia Naval
24Yard

 

25Project Allocation

20,000,000

26(Base Project Allocation -
27$20,000,000)

 

28(I6) Acquisition, construction,
29infrastructure, redevelopment,
30abatement of hazardous materials and

 

1other related costs for Building 18
2project at former Philadelphia Naval
3Yard

 

4Project Allocation

20,000,000

5(Base Project Allocation -
6$20,000,000)

 

7(J6) Construction, infrastructure,
8redevelopment and other related costs
9for Bustleton Bengals gymnasium
10project

 

11Project Allocation

300,000

12(Base Project Allocation - $300,000)

 

13(K6) Construction, redevelopment and
14other related costs for community
15center in Bustleton section of the
16city

 

17Project Allocation

1,300,000

18(Base Project Allocation - $1,300,000)

 

19(L6) Acquisition, construction,
20redevelopment and other related costs
21for medical rehabilitation facility,
22including ground level rental spaces,
23in Grays Ferry section of the city

 

24Project Allocation

8,500,000

25(Base Project Allocation - $8,500,000)

 

26(M6) Construction and other related costs
27for 52nd Street commercial corridor
28redevelopment

 

29Project Allocation

1,000,000

30(Base Project Allocation - $1,000,000)

 

1(N6) Acquisition, redevelopment and other
2related costs for Charles M. Wingfield
3Community Center

 

4Project Allocation

500,000

5(Base Project Allocation - $500,000)

 

6(O6) Acquisition, construction and other
7related costs for children's learning
8center

 

9Project Allocation

1,000,000

10(Base Project Allocation - $1,000,000)

 

11(P6) Acquisition, construction,
12infrastructure, redevelopment and
13other related costs for projects
14related to Cristo Rey Philadelphia
15High School

 

16Project Allocation

3,000,000

17(Base Project Allocation - $3,000,000)

 

18(Q6) Acquisition, construction,
19redevelopment and other related costs
20for Divine Lorraine property

 

21Project Allocation

7,500,000

22(Base Project Allocation - $7,500,000)

 

23(R6) Construction, infrastructure and
24other related costs for streetscape
25improvements in East Falls Riverfront
26Business District

 

27Project Allocation

2,500,000

28(Base Project Allocation - $2,500,000)

 

29(S6) Construction, infrastructure,
30redevelopment and other related costs

 

1for outpatient center

 

2Project Allocation

7,500,000

3(Base Project Allocation - $7,500,000)

 

4(T6) Acquisition, construction,
5infrastructure, redevelopment and
6other related costs for supermarket
7project on West Erie Avenue

 

8Project Allocation

4,375,000

9(Base Project Allocation - $4,375,000)

 

10(U6) Acquisition, construction,
11infrastructure, redevelopment and
12other related costs for supermarket
13project on West Erie Avenue

 

14Project Allocation

4,375,000

15(Base Project Allocation - $4,375,000)

 

16(V6) Acquisition, construction,
17infrastructure, redevelopment,
18abatement of hazardous materials and
19other related costs for community
20center

 

21Project Allocation

1,500,000

22(Base Project Allocation - $1,500,000)

 

23(W6) Acquisition, construction,
24redevelopment and other related costs
25for projects relating to Franklin
26Learning Center

 

27Project Allocation

7,500,000

28(Base Project Allocation - $7,500,000)

 

29(X6) Acquisition, construction,
30infrastructure, redevelopment and

 

1other related costs for projects
2relating to George Institute

 

3Project Allocation

2,500,000

4(Base Project Allocation - $2,500,000)

 

5(Y6) Acquisition, construction,
6infrastructure and other related costs
7for Friends Housing Cooperative, Inc.,
8projects

 

9Project Allocation

7,467,000

10(Base Project Allocation - $7,467,000)

 

11(Z6) Acquisition, construction,
12redevelopment and other related costs
13for rehabilitation of building for use
14as family and health care facility

 

15Project Allocation

1,925,000

16(Base Project Allocation - $1,925,000)

 

17(A7) Acquisition, construction and other
18related costs for Green Tree School
19project

 

20Project Allocation

1,000,000

21(Base Project Allocation - $1,000,000)

 

22(B7) Acquisition, construction,
23redevelopment and other related costs
24for affordable housing and retail
25development facility

 

26Project Allocation

3,000,000

27(Base Project Allocation - $3,000,000)

 

28(C7) Construction, redevelopment and
29other related costs for Hunting Park
30revitalization project

 

1Project Allocation

1,300,000

2(Base Project Allocation - $1,300,000)

 

3(D7) Acquisition, construction,
4redevelopment and other related costs
5for development of housing and
6supportive services infrastructure for
7special needs populations

 

8Project Allocation

3,000,000

9(Base Project Allocation - $3,000,000)

 

10(E7) Construction, infrastructure,
11redevelopment and other related costs
12for inpatient, outpatient, emergency
13and clinical facilities

 

14Project Allocation

5,000,000

15(Base Project Allocation - $5,000,000)

 

16(F7) Acquisition, construction,
17redevelopment and other related costs
18for projects at site of Julia R.
19Masterman High School

 

20Project Allocation

8,000,000

21(Base Project Allocation - $8,000,000)

 

22(G7) Acquisition, construction,
23redevelopment and other related costs
24for Lehigh Somerset neighborhood
25revitalization

 

26Project Allocation

5,000,000

27(Base Project Allocation - $5,000,000)

 

28(H7) Acquisition, construction,
29infrastructure, redevelopment and
30other related costs for projects

 

1relating to Mazzoni Center

 

2Project Allocation

6,000,000

3(Base Project Allocation - $6,000,000)

 

4(I7) Acquisition, construction,
5redevelopment and other related costs
6for Metropolitan Opera House

 

7Project Allocation

3,000,000

8(Base Project Allocation - $3,000,000)

 

9(J7) Construction and other related costs
10for multipurpose community facility

 

11Project Allocation

550,000

12(Base Project Allocation - $550,000)

 

13(K7) Acquisition, construction,
14redevelopment and other related costs
15for project at site of North Broad
16Salvation Army

 

17Project Allocation

10,000,000

18(Base Project Allocation -
19$10,000,000)

 

20(L7) Construction, infrastructure,
21redevelopment and other related costs
22for transit center project in north
23Philadelphia

 

24Project Allocation

20,000,000

25(Base Project Allocation -
26$20,000,000)

 

27(M7) Acquisition, construction,
28infrastructure, redevelopment and
29other related costs for revitalization
30projects in northwest Philadelphia

 

1Project Allocation

5,000,000

2(Base Project Allocation - $5,000,000)

 

3(N7) Acquisition, construction,
4redevelopment and other related costs
5for project at site of Parkway Center
6City High School

 

7Project Allocation

6,000,000

8(Base Project Allocation - $6,000,000)

 

9(O7) Construction, infrastructure,
10redevelopment and other related costs
11for projects at Philadelphia Zoo

 

12Project Allocation

30,000,000

13(Base Project Allocation -
14$30,000,000)

 

15(P7) Acquisition, construction and other
16related costs for Philly Fundamentals
17project

 

18Project Allocation

700,000

19(Base Project Allocation - $700,000)

 

20(Q7) Infrastructure, redevelopment and
21other related costs for renovations to
22Pyramid Temple No. 1, including
23elevator replacement

 

24Project Allocation

500,000

25(Base Project Allocation - $500,000)

 

26(R7) Acquisition, construction,
27infrastructure, redevelopment and
28other related costs for Richard Allen
29Preparatory School expansion project

 

30Project Allocation

5,000,000

1(Base Project Allocation - $5,000,000)

 

2(S7) Acquisition, construction,
3infrastructure, redevelopment and
4other related costs for economic
5development projects in Roxborough
6District

 

7Project Allocation

500,000

8(Base Project Allocation - $500,000)

 

9(T7) Construction, redevelopment,
10abatement of hazardous materials and
11other related costs for the Self Help
12Movement restoration and
13beautification project

 

14Project Allocation

750,000

15(Base Project Allocation - $750,000)

 

16(U7) Construction, redevelopment and
17other related costs for health center
18facility

 

19Project Allocation

300,000

20(Base Project Allocation - $300,000)

 

21(V7) Acquisition, construction,
22redevelopment and other related costs
23for Stevens property on North Broad
24Street

 

25Project Allocation

6,000,000

26(Base Project Allocation - $6,000,000)

 

27(W7) Acquisition, construction,
28redevelopment and other related costs
29for projects at Stutz property

 

30Project Allocation

5,000,000

1(Base Project Allocation - $5,000,000)

 

2(X7) Acquisition, infrastructure
3improvements and construction for
4Taller Puertorriqueno, Inc., expansion
5project

 

6Project Allocation

2,000,000

7(Base Project Allocation - $2,000,000)

 

8(Y7) Construction, infrastructure,
9redevelopment and other related costs
10for research and clinical care
11facilities

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

14(Z7) Acquisition, construction and other
15related costs for University of the
16Sciences

 

17Project Allocation

25,000,000

18(Base Project Allocation -
19$25,000,000)

 

20(A8) Construction and other related costs
21for Upsala Renewal project

 

22Project Allocation

750,000

23(Base Project Allocation - $750,000)

 

24(B8) Construction, infrastructure and
25other related costs for redevelopment
26of vacant building on Duval Steet

 

27Project Allocation

500,000

28(Base Project Allocation - $500,000)

 

29(C8) Acquisition, construction and other
30related costs for community center

 

1Project Allocation

1,000,000

2(Base Project Allocation - $1,000,000)

 

3(D8) Construction, infrastructure and
4other related costs for projects for
5Philadelphia Freedom Valley YMCA West
6Philadelphia branch

 

7Project Allocation

2,000,000

8(Base Project Allocation - $2,000,000)

 

9(E8) Acquisition, construction,
10redevelopment and other related costs
11for projects at site of William Penn
12High School

 

13Project Allocation

20,000,000

14(Base Project Allocation -
15$20,000,000)

 

16(F8) Construction, infrastructure,
17redevelopment and other related costs
18for development of properties in west
19Philadelphia

 

20Project Allocation

2,000,000

21(Base Project Allocation - $2,000,000)

 

22(G8) Acquisition, infrastructure,
23construction, redevelopment, abatement
24of hazardous materials and other
25related costs for commercial and
26mixed-use property development of
27vacant properties in Wynnefield

 

28Project Allocation

10,000,000

29(Base Project Allocation -
30$10,000,000)

 

1(H8) Acquisition, construction,
2redevelopment and other related costs
3for YESHA Family Care Center

 

4Project Allocation

2,000,000

5(Base Project Allocation - $2,000,000)

 

6(I8) Construction, acquisition,
7infrastructure and related costs for
8the expansion and redevelopment of The
9Center for Autism

 

10Project Allocation

10,000,000

11(Base Project Allocation -
12$10,000,000)

 

13(J8) Construction, abatement of hazardous
14materials and other related costs to
15renovate the historic Carpenter Shop
16on the campus of the Friends Hospital
17to become a community center

 

18Project Allocation

500,000

19(Base Project Allocation - $500,000)

 

<-20(K8) Acquisition, construction,
21infrastructure and other related costs
22for multistory facility spanning Cecil
23B. Moore Avenue and Oxford Street
24along Broad Street

 

25Project Allocation

25,000,000

26(Base Project Allocation -
27$25,000,000)

 

28(L8) Acquisition, construction and other
29related costs for CORD Advanced
30Manufacturing Training Center projects

 

1Project Allocation

2,373,000

2(Base Project Allocation - $2,373,000)

 

3(M8) Construction, infrastructure,
4redevelopment and other related costs
5to rehabilitate a historically
6certified former grain silo building
7known as the Granary

 

<-8Project Allocation

2,000,000

9(Base Project Allocation - $2,000,000)

 

<-10Project Allocation

4,000,000

11(Base Project Allocation - $4,000,000)

 

12(N8) Construction, infrastructure,
13redevelopment, abatement of hazardous
14materials and other related costs for
15Independence Seaport Museum at Penn's
16Landing

 

17Project Allocation

8,000,000

18(Base Project Allocation - $8,000,000)

 

19(O8) Construction, infrastructure,
20redevelopment, abatement of hazardous
21materials and other related costs for
22preschool project at site of Mill
23Creek Community and Cultural Center

 

24Project Allocation

1,000,000

25(Base Project Allocation - $1,000,000)

 

26(P8) Construction and other related costs
27for Christy Recreation Center
28improvement project

 

29Project Allocation

1,000,000

30(Base Project Allocation - $1,000,000)

 

<-1(Q8) Construction, infrastructure and
2other costs related to the Core
3Project of the Philadelphia Museum of
4Art

 

5Project Allocation

15,000,000

6(Base Project Allocation -
7$15,000,000)

 

8(R8) Construction, infrastructure,
9redevelopment and other related costs
10for Broad Street Ministry's
11improvements to the historic building
12along Avenue of the Arts

 

13Project Allocation

4,000,000

14(Base Project Allocation - $4,000,000)

 

15(S8) Acquisition, construction,
16infrastructure, redevelopment and
17other related costs for the relocation
18and expansion of the Council of
19Spanish Speaking Organizations, Inc.

 

20Project Allocation

4,000,000

21(Base Project Allocation - $4,000,000)

 

22(T8) Construction, infrastructure and
23other related costs for new University
24City Commercial Health Care Innovation
25Center building

 

26Project Allocation

6,000,000

27(Base Project Allocation - $6,000,000)

 

28(U8) Raymond & Miriam Klein JCC, design,
29infrastructure, construction and other
30related costs, including alternative

 

1energy projects, for new and existing
2buildings and facilities

 

3Project Allocation

1,500,000

4(Base Project Allocation - $1,500,000)

 

5(V8) Construction, infrastructure,
6redevelopment and other related costs
7for Museum of Sports

 

8Project Allocation

1,200,000

9(Base Project Allocation - $1,200,000)

 

10(52) Pike County

 

11(i) (Reserved)

 

12(53) Potter County

 

13(i) County projects

 

14(A) Acquisition, infrastructure,
15construction and other related costs
16for economic project

 

17Project Allocation

10,000,000

18(Base Project Allocation -
19$10,000,000)

 

20(54) Schuylkill County

 

21(i) Schuylkill Economic Development
22Corporation

 

23(A) Acquisition, infrastructure,
24construction, utilities extensions and
25roadway improvements for development
26of Schuylkill Airport Business Park in
27Foster Township

 

28Project Allocation

2,500,000

29(Base Project Allocation - $2,500,000)

 

30(B) Acquisition, infrastructure,

 

1construction and utilities extensions
2for expansion of Deer Lake Industrial
3Park

 

4Project Allocation

1,000,000

5(Base Project Allocation - $1,000,000)

 

6(C) Construction of industrial shell
7building at Tidewood Industrial Park

 

8Project Allocation

1,375,000

9(Base Project Allocation - $1,375,000)

 

10(D) Acquisition, infrastructure,
11construction and other related costs
12for rehabilitation of St. Catherine's
13Medical Complex located in Butler
14Township and retrofitting it into a
15multipurpose facility

 

16Project Allocation

2,000,000

17(Base Project Allocation - $2,000,000)

 

18(E) Construction of commercial and
19industrial buildings at Highridge
20Business Park

 

21Project Allocation

2,500,000

22(Base Project Allocation - $2,500,000)

 

23(F) Construction of industrial shell
24building at Highridge Business Park

 

25Project Allocation

2,925,000

26(Base Project Allocation - $2,925,000)

 

27(G) Acquisition, infrastructure,
28construction and utilities extensions
29for development and construction of
30400-acre business park

 

1Project Allocation

3,000,000

2(Base Project Allocation - $3,000,000)

 

3(ii) Coaldale Borough

 

4(A) Acquisition, infrastructure,
5renovation, construction and other
6related costs for development of
7outpatient medical facility and
8dialysis treatment center

 

9Project Allocation

2,500,000

10(Base Project Allocation - $2,500,000)

 

11(B) Infrastructure, rehabilitation,
12construction and other related costs
13for expansion of St. Luke's Miners
14Hospital

 

15Project Allocation

10,000,000

16(Base Project Allocation -
17$10,000,000)

 

18(iii) Mahanoy City Borough

 

19(A) Acquisition, infrastructure,
20renovation, construction and other
21related costs for development of new
22outpatient medical office building

 

23Project Allocation

1,500,000

24(Base Project Allocation - $1,500,000)

 

<-25(iii.1) City of Pottsville

 

26(A) Infrastructure, construction and
27other related costs for infrastructure
28improvements to Schuylkill Health
29System facilities

 

30Project Allocation

2,000,000

1(Base Project Allocation - $2,000,000)

 

2(iv) Tamaqua Borough

 

3(A) Acquisition, infrastructure,
4renovation, construction and other
5related costs for development of
6facility to house state-of-the-art
7police station, antiblight education
8center, emergency center and
9magisterial district court

 

10Project Allocation

2,000,000

11(Base Project Allocation - $2,000,000)

 

12(B) Acquisition, infrastructure,
13renovation, construction and other
14related costs for new state-of-the-art
15public library, to be constructed in
16downtown historic district

 

17Project Allocation

2,500,000

18(Base Project Allocation - $2,500,000)

 

19(C) Acquisition, infrastructure,
20renovation, construction and other
21related costs for redevelopment of
22downtown business district

 

23Project Allocation

4,000,000

24(Base Project Allocation - $4,000,000)

 

25(D) Acquisition, infrastructure,
26renovation, construction, utilities
27extensions and other related costs for
28construction of high-tech industrial
29community park on east end of borough
30along Route 209

 

1Project Allocation

5,000,000

2(Base Project Allocation - $5,000,000)

 

3(55) Snyder County

 

4(i) (Reserved)

 

5(ii) Shamokin Dam Borough <-and Monroe Township

 

6(A) Construction, infrastructure,
7redevelopment and other related costs
8for conversion of coal-fired power
9plant to natural gas-fired combined-
10cycle power plant

 

11Project Allocation

80,000,000

12(Base Project Allocation -
13$80,000,000)

 

14(56) Somerset County

 

15(i) County Projects

 

16(A) Land acquisition, construction,
17infrastructure and related costs for
18the expansion of Riggs Industries and
19its subsidiaries

 

20Project Allocation

10,000,000

21(Base Project Allocation -
22$10,000,000)

 

<-23(B) Acquisition, construction,
24infrastructure and other related costs
25for ambulatory care center

 

26Project Allocation

5,000,000

27(Base Project Allocation - $5,000,000)

 

28(C) Acquisition, construction,
29infrastructure and other related costs
30for outdoor recreational tourism

 

1facility and related projects

 

2Project Allocation

1,000,000

3(Base Project Allocation - $1,000,000)

 

4(D) Acquisition, construction,
5infrastructure and other related costs
6for natural gas refueling station

 

7Project Allocation

1,000,000

8(Base Project Allocation - $1,000,000)

 

<-9(E) Acquisition, construction,
10infrastructure and other related costs
11for expansion of oil and gas
12wastewater treatment facility

 

13Project Allocation

50,000,000

14(Base Project Allocation -
15$50,000,000)

 

16(i.1) Quemahoning Township

 

17(A) Construction, infrastructure and
18other related costs for rail projects
19relating to economic development
20projects

 

21Project Allocation

2,000,000

22(Base Project Allocation - $2,000,000)

 

23(i.2) Shade Township

 

24(A) Acquisition, construction,
25infrastructure and other related costs
26for rail siding and transloading
27facility

 

28Project Allocation

2,100,000

29(Base Project Allocation - $2,100,000)

 

30(ii) Somerset Borough

 

1(A) Construction, infrastructure and
2other costs related to Somerset
3Hospital campus improvement project

 

4Project Allocation

4,000,000

5(Base Project Allocation - $4,000,000)

 

6(iii) Somerset Township

 

7(A) Construction, infrastructure and
8other costs related to Twin Lakes
9Rehabilitation Center project

 

10Project Allocation

500,000

11(Base Project Allocation - $500,000)

 

<-12(iv) Windber Borough

 

13(A) Acquisition, construction,
14infrastructure, redevelopment,
15abatement of hazardous materials and
16other related costs for educational
17facility projects relating to Windber
18Coal Heritage Museum

 

19Project Allocation

1,000,000

20(Base Project Allocation - $1,000,000)

 

21(57) Sullivan County

 

22(i) (Reserved)

 

<-23(ii) Laporte Borough

 

24(A) Infrastructure, redevelopment and
25other related costs for upgrades to
26medical equipment and services for
27rural health clinic

 

28Project Allocation

1,000,000

29(Base Project Allocation - $1,000,000)

 

30(58) Susquehanna County

 

1(i) The Progress Authority

 

2(A) Infrastructure improvements,
3renovations, construction and other
4related costs for improvements to Camp
5Archbald

 

6Project Allocation

1,000,000

7(Base Project Allocation - $1,000,000)

 

<-8(ii) Central Bradford Industrial Development
9Authority

 

10(A) Construction, acquisition,
11infrastructure, redevelopment and
12other related costs for a business
13park along the I-81 corridor

 

14Project Allocation

2,000,000

15(Base Project Allocation - $2,000,000)

 

16(iii) Bridgewater Township

 

17(A) Construction, infrastructure and
18other related costs for an extension
19of a public waterline

 

20Project Allocation

500,000

21(Base Project Allocation - $500,000)

 

<-22(iv) Montrose Borough

 

23(A) Construction, infrastructure and
24other related costs for an outpatient
25rehabilitation department, infusion
26therapy, cardiopulmonary and
27administrative and business offices to
28the hospital campus for Endless
29Mountains Health Systems

 

30Project Allocation

5,000,000

1(Base Project Allocation - $5,000,000)

 

2(59) Tioga County

 

3(i) County projects

 

4(A) Acquisition, infrastructure,
5construction and other related costs
6for economic project

 

7Project Allocation

10,000,000

8(Base Project Allocation -
9$10,000,000)

 

10(B) Infrastructure, renovation,
11construction and other related costs
12for state-of-the-art cancer center at
13Soldiers and Sailors Memorial Hospital

 

14Project Allocation

2,100,000

15(Base Project Allocation - $2,100,000)

 

16(C) Infrastructure, renovation,
17construction and other related costs
18for a same day surgery unit and state-
19of-the-art emergency department at
20Soldiers and Sailors Memorial Hospital

 

21Project Allocation

18,500,000

22(Base Project Allocation -
23$18,500,000)

 

24(ii) Tioga County Development Corporation

 

25(A) Design, engineering, site
26development, infrastructure,
27demolition, construction and other
28costs related to redevelopment of the
29former E. H. Hall, Inc./WESTAN Tannery
30brownfield site into Westfield

 

1Business Park

 

2Project Allocation

4,600,000

3(Base Project Allocation - $4,600,000)

 

<-4(iii) Wellsboro Borough

 

5(A) Redevelopment, construction and other
6related costs for community athletic
7complex

 

8Project Allocation

3,000,000

9(Base Project Allocation - $3,000,000)

 

10(iv) Wellsboro Borough and Richmond Township

 

11(A) Construction, acquisition, expansion,
12renovation and other related costs for
13Susquehanna Health/Laurel Health
14Entities/North Penn Comprehensive
15Health Services

 

16Project Allocation

15,000,000

17(Base Project Allocation -
18$15,000,000)

 

19(60) Union County

 

20(i) (Reserved)

 

<-21(ii) Kelly Township

 

22(A) Transportation infrastructure
23improvements associated with expansion
24of Evangelical Community Hospital
25facilities on grounds of existing
26hospital and on adjacent land

 

27Project Allocation

4,100,000

28(Base Project Allocation - $4,100,000)

 

29(61) Venango County

 

30(i) Oil Region Alliance

 

1(A) Acquisition, infrastructure,
2construction and other related costs
3for development of senior living
4multiphase care facility, to include
5independent cottage campus, assisted
6living and nursing home care

 

7Project Allocation

7,000,000

8(Base Project Allocation - $7,000,000)

 

9(62) Warren County

 

10(i) County projects

 

11(A) Acquisition, infrastructure,
12construction and other related costs
13for economic project

 

14Project Allocation

10,000,000

15(Base Project Allocation -
16$10,000,000)

 

17(63) Washington County

 

18(i) County projects

 

19(A) Acquisition, construction,
20infrastructure, redevelopment and
21other costs related to mixed-use
22business park

 

23Project Allocation

2,000,000

24(Base Project Allocation - $2,000,000)

 

25(B) Acquisition, construction,
26infrastructure, redevelopment and
27other costs related to development of
28pad-ready sites along I-79 and Route
2919 corridor

 

30Project Allocation

5,000,000

1(Base Project Allocation - $5,000,000)

 

2(C) Acquisition, construction,
3infrastructure, redevelopment and
4other costs related to economic
5development projects

 

6Project Allocation

10,000,000

7(Base Project Allocation -
8$10,000,000)

 

<-9(D) Acquisition, construction,
10infrastructure and other related costs
11for redevelopment projects relating to
12natural gas industry

 

13Project Allocation

3,000,000

14(Base Project Allocation - $3,000,000)

 

15(E) Acquisition, construction,
16infrastructure and other related costs
17for redevelopment projects relating to
18natural gas industry

 

19Project Allocation

3,000,000

20(Base Project Allocation - $3,000,000)

 

21(F) Construction, infrastructure and
22other related costs for Skypointe
23Business Park project

 

24Project Allocation

5,000,000

25(Base Project Allocation - $5,000,000)

 

26(G) Acquisition, construction,
27infrastructure and other related costs
28for development of sites adjacent to
29Washington County Airport

 

30Project Allocation

10,000,000

1(Base Project Allocation -
2$10,000,000)

 

3(H) Construction, rehabilitation and
4other related costs for senior living
5project

 

6Project Allocation

2,050,000

7(Base Project Allocation - $2,050,000)

 

8(I) Construction, infrastructure,
9abatement of hazardous materials and
10other related costs for redevelopment
11and renovation of historical YWCA
12building on West Maiden Street

 

13Project Allocation

3,000,000

14(Base Project Allocation - $3,000,000)

 

15(J) Acquisition, infrastructure and other
16related costs for development of site
17along Route 19 and I-70 corridor

 

18Project Allocation

5,000,000

19(Base Project Allocation - $5,000,000)

 

20(K) Acquisition, construction,
21infrastructure redevelopment and other
22related costs for development of pad-
23ready sites

 

24Project Allocation

5,000,000

25(Base Project Allocation - $5,000,000)

 

26(L) Construction, abatement of hazardous
27materials and other related costs for
28redevelopment of former industrial
29sites and brownfields

 

30Project Allocation

5,000,000

1(Base Project Allocation - $5,000,000)

 

2(ii) Allenport Borough

 

3(A) Acquisition, construction,
4infrastructure, redevelopment and
5other costs related to site
6improvement project at Mon River
7Industrial Park

 

8Project Allocation

10,000,000

9(Base Project Allocation -
10$10,000,000)

 

<-11(ii.1) Buffalo Township

 

12(A) Acquisition, construction,
13infrastructure and other related costs
14for mixed-use trail

 

15Project Allocation

500,000

16(Base Project Allocation - $500,000)

 

17(B) Construction, infrastructure and
18other related costs for water line
19installation in Blain and Buffalo
20Townships

 

21Project Allocation

1,000,000

22(Base Project Allocation - $1,000,000)

 

23(ii.2) Burgettstown Borough

 

24(A) Construction, infrastructure and
25other related costs for Starpointe
26Business Park project

 

27Project Allocation

15,000,000

28(Base Project Allocation -
29$15,000,000)

 

30(ii.3) California Borough

 

1(A) Construction, redevelopment and other
2related costs for Center in the Woods
3improvement project

 

4Project Allocation

500,000

5(Base Project Allocation - $500,000)

 

6(ii.1) <-(ii.4) Canonsburg Borough

 

7(A) Acquisition, construction,
8infrastructure improvements and other
9costs related to a Pop Music Hall of
10Fame project

 

11Project Allocation

5,000,000

12(Base Project Allocation - $5,000,000)

 

<-13(ii.5) Carroll Township

 

14(A) Construction, infrastructure
15redevelopment and other related costs
16for projects at Mon Valley YMCA

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(B) Acquisition, construction,
20infrastructure and other related costs
21for loadout facility

 

22Project Allocation

4,750,000

23(Base Project Allocation - $4,750,000)

 

24(C) Construction, redevelopment and other
25related costs for Monongahela Valley
26Hospital

 

27Project Allocation

1,000,000

28(Base Project Allocation - $1,000,000)

 

29(ii.6) Cecil Township

 

30(A) Acquisition, construction,

 

1infrastructure and other related costs
2for park improvements

 

3Project Allocation

1,250,000

4(Base Project Allocation - $1,250,000)

 

5(iii) Hanover Township

 

6(A) Acquisition, construction,
7infrastructure, redevelopment and
8other costs related to Starpointe
9Business Park expansion project

 

10Project Allocation

15,000,000

11(Base Project Allocation -
12$15,000,000)

 

<-13(iii.1) Jefferson Township

 

14(A) Acquisition, construction,
15infrastructure, redevelopment and
16other related costs for projects at
17Meadowcroft Rockshelter and historic
18village

 

19Project Allocation

2,000,000

20(Base Project Allocation - $2,000,000)

 

21(iii.2) City of Monongahela

 

22(A) Acquisition, construction,
23infrastructure, redevelopment,
24abatement of hazardous materials and
25other related costs for projects
26relating to Noble J. Dick Aquatorium

 

27Project Allocation

600,000

28(Base Project Allocation - $600,000)

 

29(iii.3) Peters Township

 

30(A) Construction, infrastructure,

 

1redevelopment, renovation and other
2related costs for improvements to
3Peterswood Park

 

4Project Allocation

650,000

5(Base Project Allocation - $650,000)

 

6(B) Construction, infrastructure,
7redevelopment, renovation and other
8related costs for Peters Township
9Amphitheater

 

10Project Allocation

500,000

11(Base Project Allocation - $500,000)

 

12(iii.4) South Fayette Township

 

13(A) Acquisition, construction,
14infrastructure and other related costs
15for park improvements

 

16Project Allocation

1,000,000

17(Base Project Allocation - $1,000,000)

 

18(B) Construction, infrastructure and
19other related costs for civic center

 

20Project Allocation

4,000,000

21(Base Project Allocation - $4,000,000)

 

22(iv) South Strabane Township

 

23(A) Acquisition, construction,
24infrastructure, redevelopment and
25other costs related to Zediker Station
26Business Park improvement project

 

27Project Allocation

10,000,000

28(Base Project Allocation -
29$10,000,000)

 

30(B) Acquisition, construction,

 

1infrastructure, redevelopment and
2other costs related to development of
3business park in the township

 

4Project Allocation

10,000,000

5(Base Project Allocation -
6$10,000,000)

 

7(C) Acquisition, construction,
8infrastructure, redevelopment and
9other costs related to locating sites
10for support companies for natural gas
11industry

 

12Project Allocation

3,000,000

13(Base Project Allocation - $3,000,000)

 

14(D) Acquisition, construction,
15infrastructure, redevelopment and
16other costs related to redevelopment
17of former industrial sites for new and
18expanding businesses

 

19Project Allocation

5,000,000

20(Base Project Allocation - $5,000,000)

 

21(E) Acquisition, construction,
22infrastructure, redevelopment and
23other costs related to Mon Valley
24receiving and loading facility
25development project

 

26Project Allocation

5,000,000

27(Base Project Allocation - $5,000,000)

 

28(F) Acquisition, construction,
29infrastructure, redevelopment and
30other costs related to development of

 

1sites adjacent to Washington County
2Airport for aviation-related business
3park

 

4Project Allocation

10,000,000

5(Base Project Allocation -
6$10,000,000)

 

7(G) Acquisition, construction,
8infrastructure, redevelopment and
9other costs related to Skypointe
10business park

 

11Project Allocation

5,000,000

12(Base Project Allocation - $5,000,000)

 

13(H) Acquisition, infrastructure,
14construction and other related costs
15for former foundry site mixed-use
16redevelopment project

 

17Project Allocation

3,000,000

18(Base Project Allocation - $3,000,000)

 

<-19(I) Acquisition, construction,
20infrastructure, abatement of hazardous
21materials and other related costs for
22redevelopment of former industrial
23sites

 

24Project Allocation

5,000,000

25(Base Project Allocation - $5,000,000)

 

26(J) Acquisition, construction,
27infrastructure, redevelopment and
28other related costs for business park
29project

 

30Project Allocation

10,000,000

1(Base Project Allocation -
2$10,000,000)

 

3(K) Acquisition, construction,
4infrastructure, redevelopment and
5other related costs for Zediker
6Station Business Park

 

7Project Allocation

10,000,000

8(Base Project Allocation -
9$10,000,000)

 

10(64) Wayne County

 

11(i) (Reserved)

 

12(65) Westmoreland County

 

13(i) County projects

 

14(A) Construction, renovation,
15modernization, reconstruction and
16expansion of Excela Health System
17Westmoreland Hospital Intensive Care
18and short-stay units

 

19Project Allocation

4,500,000

20(Base Project Allocation - $4,500,000)

 

21(B) Construction of Excela Health System
22Latrobe Ambulatory Care Center

 

23Project Allocation

10,000,000

24(Base Project Allocation -
25$10,000,000)

 

26(C) Construction of Excela Health System
27Orthopedic Center of Excellence

 

28Project Allocation

11,500,000

29(Base Project Allocation -
30$11,500,000)

 

1(D) Infrastructure, renovation, abatement
2of hazardous materials, construction
3and other related costs for state-of-
4the-art Southern Alleghenies Museum of
5Art Education, Conference and
6Collection Management Center

 

7Project Allocation

4,000,000

8(Base Project Allocation - $4,000,000)

 

9(ii) Latrobe Redevelopment Authority

 

10(A) Construction of LEED-certified
11multipurpose athletic, educational and
12cultural center

 

13Project Allocation

8,000,000

14(Base Project Allocation - $8,000,000)

 

15(iii) Westmoreland County Industrial
16Development Corporation

 

17(A) Acquisition, demolition, site
18preparation, environmental
19remediation, construction and other
20costs related to redevelopment of
21brownfield and blighted property in
22City of Jeannette for future
23commercial use

 

24Project Allocation

1,000,000

25(Base Project Allocation - $1,000,000)

 

26(B) Acquisition, infrastructure
27extensions and improvements,
28construction and other related costs
29for 150-acre industrial park

 

30Project Allocation

2,000,000

1(Base Project Allocation - $2,000,000)

 

2(iv) City of Lower Burrell

 

3(A) Acquisition, construction,
4demolition, infrastructure,
5redevelopment and other costs related
6to Lower Burrell redevelopment project
7for commercial reuse and development

 

8Project Allocation

2,000,000

9(Base Project Allocation - $2,000,000)

 

<-10(v) City of New Kensington

 

11(A) Construction, acquisition,
12infrastructure, redevelopment and
13other related costs for renovation and
14rehabilitation of downtown business
15district

 

16Project Allocation

5,000,000

17(Base Project Allocation - $5,000,000)

 

18(vi) East Huntingdon Township

 

19(A) Construction, infrastructure,
20redevelopment and other related costs
21for Pittsburgh Supercomputing Center
22projects

 

23Project Allocation

4,000,000

24(Base Project Allocation - $4,000,000)

 

25(vii) Hempfield Township

 

26(A) Acquisition, construction,
27infrastructure, redevelopment and
28other related costs for development
29projects

 

30Project Allocation

10,000,000

1(Base Project Allocation -
2$10,000,000)

 

3(viii) City of Monessen

 

4(A) Construction, redevelopment and other
5related costs for rehabilitation of
6downtown business district

 

7Project Allocation

1,000,000

8(Base Project Allocation - $1,000,000)

 

9(B) Construction, infrastructure and
10other related costs for rail expansion
11project

 

12Project Allocation

750,000

13(Base Project Allocation - $750,000)

 

14(v) <-(ix) North Huntington Township

 

15(A) Construction and other related costs
16for development of regional facility
17to be utilized as a professional
18development center for effective
19teaching and learning of science,
20technology, engineering and
21mathematics

 

22Project Allocation

2,500,000

23(Base Project Allocation - $2,500,000)

 

<-24(x) Upper Burrell Township

 

25(A) Acquisition, infrastructure
26improvements, construction and other
27related costs for industrial park

 

28Project Allocation

5,000,000

29(Base Project Allocation - $5,000,000)

 

30(66) Wyoming County

 

1(i) (Reserved)

 

2(67) York County

 

<-3(i) County projects

 

4(A) Land acquisition, design, adaptive
5reuse and construction of buildings,
6exhibits and related site
7infrastructure for development of
8Susquehanna River visitor education
9center

 

10Project Allocation

2,200,000

11(Base Project Allocation - $2,200,000)

 

<-12(i) Redevelopment Authority of the City of
13York

 

<-14(i.1) Redevelopment Authority of the City of
15York

 

16(A) Acquisition, infrastructure,
17renovation, construction and
18rehabilitation for revitalization of
19West Market Street between George and
20Beaver Streets

 

21Project Allocation

5,000,000

22(Base Project Allocation - $5,000,000)

 

23(B) Acquisition, infrastructure,
24renovation, construction and other
25related costs, including abatement of
26hazardous materials, for redevelopment
27of Northwest Triangle site and
28construction of commercial,
29residential and retail mixed-use
30facilities

 

1Project Allocation

6,000,000

2(Base Project Allocation - $6,000,000)

 

3(ii) Redevelopment Authority of the County of
4York

 

5(A) Infrastructure, renovation,
6construction and other related costs
7for redevelopment of downtown Hanover,
8including historic buildings, blighted
9buildings and Hanover State Theatre

 

10Project Allocation

8,000,000

11(Base Project Allocation - $8,000,000)

 

12(B) Infrastructure, construction and
13other related costs for renovations
14and rehabilitation of York College of
15Pennsylvania campuses, including
16classrooms, laboratories, offices and
17student support facilities

 

18Project Allocation

10,000,000

19(Base Project Allocation -
20$10,000,000)

 

21(C) Infrastructure, construction and
22other related costs for renovations
23and rehabilitation of York College of
24Pennsylvania's North Campus, including
25classrooms, laboratories, offices,
26student support and other academic
27facilities

 

28Project Allocation

12,000,000

29(Base Project Allocation -
30$12,000,000)

 

1(iii) City of York

 

2(A) Construction, renovation,
3infrastructure and other related costs
4for redevelopment and revitalization
5of Shipley Energy property

 

6Project Allocation

10,000,000

7(Base Project Allocation -
8$10,000,000)

 

<-9(B) Construction, infrastructure,
10acquisition, redevelopment and other
11related costs for renovation of
12existing commercial space

 

<-13(B) Construction, infrastructure,
14acquisition, redevelopment and other
15related costs for construction of new
16buildings in the City of York

 

17Project Allocation

15,000,000

18(Base Project Allocation -
19$15,000,000)

 

20(iv) Red Lion Borough

 

21(A) Construction, infrastructure and
22other related costs for expansion of
23Kaltreider-Benfer Library

 

24Project Allocation

1,040,000

25(Base Project Allocation - $1,040,000)

 

<-26(v) Spring Grove Borough

 

27(A) Construction, abatement of hazardous
28materials, renovation and other
29related costs for Glatfelter to make
30modifications to existing cogenerator

 

1boiler and replacement of three
2existing coal-fired boilers with new
3natural gas-fired package boilers, a
4new natural gas pipeline and
5remediation and demolition of old
6recovery building containing asbestos,
7lead and biological hazards to comply
8with Boiler Maximum Achievable Control
9Technology regulations

 

10Project Allocation

5,000,000

11(Base Project Allocation - $5,000,000)

 

12(68) Multiple Counties

 

13(i) Crawford, Erie, Mercer, Venango and
14Warren Counties

 

15(A) Acquisition, infrastructure,
16renovation and other related costs for
17demolition of existing structures and
18construction of several incubator
19facilities

 

20Project Allocation

5,000,000

21(Base Project Allocation - $5,000,000)

 

22(ii) Centre, Columbia, Lackawanna, Luzerne,
23Mifflin, Montour and Northumberland
24Counties

 

25(A) Acquisition, construction,
26infrastructure, redevelopment and
27other related costs for facilities to
28deliver medical services, conduct
29research and provide other related
30activities for Geisinger Health System

 

1Project Allocation

30,000,000

2(Base Project Allocation -
3$30,000,000)

 

4(iii) Pike and Wayne Counties

 

5(A) Wayne Economic Development
6Corporation, land acquisition,
7construction, infrastructure
8development and other related costs
9for career and technology center

 

10Project Allocation

11,000,000

11(Base Project Allocation -
12$11,000,000)

 

13(iv) Berks, Lehigh and York Counties

 

14(A) Redevelopment Authority of the City
15of York, acquisition, site
16preparation, infrastructure,
17construction and other related costs
18for Think Loud Development project in
19Cities of Reading, Allentown and York,
20including renovations and strategic
21reuse of historic properties and
22installation of fiber optic
23infrastructure

 

24Project Allocation

10,000,000

25(Base Project Allocation -
26$10,000,000)

 

27(v) Allegheny, Beaver, Cambria, Erie,
28Washington and Westmoreland Counties

 

29(A) Acquisition, construction,
30infrastructure, redevelopment and

 

1other costs related to Children's
2Hospital of Pittsburgh of UPMC

 

3Project Allocation

10,000,000

4(Base Project Allocation -
5$10,000,000)

 

6(vi) Lackawanna and Luzerne Counties

 

7(A) Acquisition, construction,
8infrastructure and other costs related
9to Mine Drainage Treatment Works
10project

 

11Project Allocation

18,000,000

12(Base Project Allocation -
13$18,000,000)

 

14(vii) Montgomery and Philadelphia Counties

 

15(A) Construction, infrastructure and
16other costs related to Saint Joseph's
17University improvement project

 

18Project Allocation

21,300,000

19(Base Project Allocation -
20$21,300,000)

 

21(B) City Avenue Special Services
22District. Construction, infrastructure
23improvements and other related costs
24on City Avenue for pedestrian and
25vehicular hazard mitigation and storm
26water management in Lower Merion and
27the City of Philadelphia

 

28Project Allocation

5,000,000

29(Base Project Allocation - $5,000,000)

 

30(viii) Berks and Montgomery Counties

 

1(A) Construction, infrastructure and
2other related costs for rehabilitation
3of historic Civil War era railroad
4project

 

5Project Allocation

4,000,000

6(Base Project Allocation - $4,000,000)

 

7(ix) Fayette and Somerset Counties

 

8(A) Infrastructure improvements, new
9construction and renovations at Seven
10Springs Mountain Resort, Seven Springs
11Borough

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

<-14(x) Allegheny and Beaver Counties

 

15(A) Site development, new construction,
16acquisition, expansion, additions,
17infrastructure, improvements,
18rehabilitation, renovation and other
19related costs for automated food
20distribution center on a site owned by
21Pittsburgh DC 2013, LLC

 

22Project Allocation

20,000,000

23(Base Project Allocation -
24$20,000,000)

 

25Section 7. Itemization of flood control projects.

26Additional capital projects in the category of flood control
27projects to be constructed by the Department of Environmental
28Protection, its successors or assigns, and to be financed by the
29incurring of debt are hereby itemized, together with their
30respective estimated costs, as follows:

1 

2Project

Total Project

Allocation

3(1) Department of Environmental Protection

 

4(i) Allegheny County

 

5(A) Funding for flood protection and
6rehabilitation of Pine Creek in Shaler
7Township

 

8Project Allocation

900,000

9(Base Project Allocation - $810,000)

 

10(Design & Contingencies - $90,000)

 

11(B) Infrastructure, construction and
12other costs related to Pine Creek
13Watershed flood control project,
14including reconstruction of culvert
15and retrofit of three existing
16detention basins

 

17Project Allocation

96,000

18(Base Project Allocation - $80,000)

 

19(Design & Contingencies - $16,000)

 

<-20(ii) Bucks County

 

21(A) Construction and other related costs
22to construct stream bed line with
23riprap and bank stabilization to
24control erosion and flooding in
25Langhorne Borough

 

26Project Allocation

100,000

27(Base Project Allocation - $100,000)

 

28(B) Rehabilitation and other related
29costs for retention basin for
30Poquessing Creek in Bensalem Township

 

1Project Allocation

500,000

2(Base Project Allocation - $500,000)

 

3(ii) <-(iii) Cambria County

 

4(A) Additional funding for DGS Project
5184-34, City of Johnstown, channel
6improvements to St. Clair Run,
7including rehabilitation and
8mitigation

 

9Project Allocation

1,350,000

10(Base Project Allocation - $1,215,000)

 

11(Design & Contingencies - $135,000)

 

12(B) Funding for flood protection of
13Solomon's Run, including
14rehabilitation and mitigation, in City
15of Johnstown

 

16Project Allocation

540,000

17(Base Project Allocation - $486,000)

 

18(Design & Contingencies - $54,000)

 

19(C) Rehabilitate five levee drainage
20structures along Chest Creek and
21Flannigan Run, including mitigation,
22in Patton Borough and Chest and Elder
23Townships

 

24Project Allocation

1,350,000

25(Base Project Allocation - $1,215,000)

 

26(Design & Contingencies - $135,000)

 

27(D) Funding for flood protection of
28Solomon's Run, including
29rehabilitation and mitigation, in
30Stonycreek Township and Dale Borough

 

1Project Allocation

900,000

2(Base Project Allocation - $810,000)

 

3(Design & Contingencies - $90,000)

 

<-4(iv) Chester County

 

5(A) Construction, infrastructure and
6other related costs for storm water
7control in Schuylkill Township

 

8Project Allocation

7,000,000

9(Base Project Allocation - $7,000,000)

 

10(B) Construction, infrastructure and
11other related costs to address
12existing watershed problems,
13accelerated stream bank erosion and
14water quality in Tredyffrin Township

 

15Project Allocation

9,000,000

16(Base Project Allocation - $9,000,000)

 

<-17(C) Acquisition, construction,
18infrastructure, redevelopment and
19other related costs for flood
20mitigation projects along Chester
21Creek, including upgrades to levee

 

22Project Allocation

10,000,000

23(Base Project Allocation -
24$10,000,000)

 

25(v) Columbia County

 

26(A) Rehabilitation and other related
27costs for bank stabilization, gravel
28bar removal and debris removal at
29Columbia County Soil Conservation

 

30Project Allocation

1,000,000

1(Base Project Allocation - $1,000,000)

 

2(iii) <-(vi) Delaware County

 

3(A) Construction, infrastructure and
4other costs related to installation of
5stream gauge on Darby Creek

 

6Project Allocation

538,000

7(Base Project Allocation - $538,000)

 

8(B) Acquisition, demolition,
9construction, infrastructure and other
10costs related to Darby Borough flood
11remediation program

 

12Project Allocation

6,200,000

13(Base Project Allocation - $6,200,000)

 

<-14(C) Upgrades and deferred maintenance,
15Phase VII

 

16Project Allocation

550,000

17(Base Project Allocation - $550,000)

 

18(iv) <-(vii) Lackawanna County

 

19(A) Rehabilitate seven levee drainage
20structures along Lackawanna River,
21including mitigation, in Mayfield
22Borough

 

23Project Allocation

2,700,000

24(Base Project Allocation - $2,430,000)

 

25(Design & Contingencies - $270,000)

 

26(B) Funding for Moosic flood protection
27project, including rehabilitation and
28mitigation, along Spring Creek

 

29Project Allocation

2,700,000

30(Base Project Allocation - $2,430,000)

 

1(Design & Contingencies - $270,000)

 

2(C) Funding for Blakely flood protection
3project, including rehabilitation and
4mitigation, along Hull Creek in
5Blakely and Dickson City Boroughs

 

6Project Allocation

900,000

7(Base Project Allocation - $810,000)

 

8(Design & Contingencies - $90,000)

 

9(D) Funding for Scranton flood control
10project, including rehabilitation and
11mitigation, along Roaring Brook

 

12Project Allocation

4,500,000

13(Base Project Allocation - $4,050,000)

 

14(Design & Contingencies - $450,000)

 

15(E) Construction, infrastructure and
16other related costs for Racket Brook
17Creek retaining wall replacement
18project in City of Carbondale

 

19Project Allocation

1,540,000

20(Base Project Allocation - $1,540,000)

 

21(F) Construction, infrastructure and
22other related costs for Mayfield
23Borough levee extension project

 

24Project Allocation

772,000

25(Base Project Allocation - $772,000)

 

<-26(G) Construction, infrastructure and
27other related costs for Tinklepaugh
28Creek flood mitigation projects in
29Archbald and Blakely Boroughs

 

30Project Allocation

2,500,000

1(Base Project Allocation - $2,500,000)

 

2(v) (<-viii) Luzerne County

 

3(A) Additional funding for DGS Project
4182-3, flood protection project for
5Wadham Creek, including rehabilitation
6and mitigation, in Plymouth Borough

 

7Project Allocation

540,000

8(Base Project Allocation - $486,000)

 

9(Design & Contingencies - $54,000)

 

10(B) Funding for Mocanaqua flood
11protection project, including
12rehabilitation and mitigation along
13Turtle Creek, in Conyngham Township

 

14Project Allocation

540,000

15(Base Project Allocation - $486,000)

 

16(Design & Contingencies - $54,000)

 

17(vi) <-(ix) Montgomery County

 

18(A) Funding for Ambler flood protection
19project, including acquisition,
20infrastructure, rehabilitation and
21construction of storm water bypass
22facility, culverts and upstream
23neighborhood regional detention basins

 

24Project Allocation

2,475,000

25(Base Project Allocation - $2,250,000)

 

26(Design & Contingencies - $225,000)

 

27(B) Funding for Turnpike Drive storm
28water improvement project, including
29infrastructure, rehabilitation and
30construction of regional storm water

 

1management basin in Upper Moreland
2Township

 

3Project Allocation

550,000

4(Base Project Allocation - $500,000)

 

5(Design & Contingencies - $50,000)

 

6(C) Acquisition, construction,
7infrastructure and other costs related
8to Glenside Flood Control buyout
9project in Cheltenham Township

 

10Project Allocation

8,000,000

11(Base Project Allocation - $8,000,000)

 

12(D) Construction, infrastructure and
13other costs related to flood control
14improvement projects in headwaters of
15Tookany Creek in Cheltenham Township

 

16Project Allocation

1,000,000

17(Base Project Allocation - $1,000,000)

 

18(E) Construction, infrastructure and
19other costs related to Glenside flood
20control project Phase II in Cheltenham
21Township

 

22Project Allocation

5,000,000

23(Base Project Allocation - $5,000,000)

 

<-24(F) Acquisition, construction,
25infrastructure and other costs related
26to Glenside area flood protection
27project

 

28Project Allocation

8,000,000

29(Base Project Allocation - $8,000,000)

 

30(G) Construction, infrastructure and

 

1other costs related to Glenside area
2flood protection project, Phase II, in
3Cheltenham Township along Tookany
4Creek

 

5Project Allocation

3,000,000

6(Base Project Allocation - $3,000,000)

 

7(H) Construction, infrastructure and
8other related costs to Tookany Creek
9headwaters flood control project

 

10Project Allocation

1,000,000

11(Base Project Allocation - $1,000,000)

 

12(vii) <-(x) Northampton County

 

13(A) Permanent reconstruction of storm
14sewer system causing the flooding of
15private, residential properties in
16Bangor Borough

 

17Project Allocation

506,000

18(Base Project Allocation - $506,000)

 

<-19(xi) Northumberland County

 

20(A) Construction, infrastructure,
21acquisition and other related costs
22for rehabilitation of Shamokin Creek
23and Quaker Run Creek channels to
24alleviate flooding in Coal Township

 

25Project Allocation

14,000,000

26(Base Project Allocation -
27$14,000,000)

 

28(B) Repairs to mitigate flood water in
29several areas throughout Lower Saucon
30Township

 

1Project Allocation

1,250,000

2(Base Project Allocation - $1,250,000)

 

3(viii) <-(xii) Potter County

 

4(A) Rehabilitate three levee drainage
5structures along Allegheny River and
6Mill Creek, including mitigation, in
7Coudersport Borough

 

8Project Allocation

900,000

9(Base Project Allocation - $810,000)

 

10(Design & Contingencies - $90,000)

 

11(ix) <-(xiii) Schuylkill County

 

12(A) Funding for McAdoo flood protection
13project, including rehabilitation and
14mitigation, along Celebration Creek in
15McAdoo, Kline and Banks Townships

 

16Project Allocation

540,000

17(Base Project Allocation - $486,000)

 

18(Design & Contingencies - $54,000)

 

19(x) <-(xiv) Somerset County

 

20(A) Rehabilitate 25 levee drainage
21structures along Paint Creek,
22including mitigation, in Windber and
23Paint Boroughs

 

24Project Allocation

4,950,000

25(Base Project Allocation - $4,455,000)

 

26(Design & Contingencies - $495,000)

 

27(B) Rehabilitate 18 levee drainage
28structures along Coxes Creek,
29including mitigation, in Rockwood
30Borough

 

1Project Allocation

3,600,000

2(Base Project Allocation - $3,240,000)

 

3(Design & Contingencies - $360,000)

 

4(C) Construction, infrastructure and
5other costs related to North Fork dam
6and bridge modifications and repair
7project

 

8Project Allocation

10,000,000

9(Base Project Allocation -
10$10,000,000)

 

<-11(D) Construction, redevelopment,
12rehabilitation and other related costs
13for Hyndman Borough levee

 

14Project Allocation

500,000

15(Base Project Allocation - $500,000)

 

16(xi) <-(xv) Warren County

 

17(A) Rehabilitate nine levee drainage
18structures along Glade Run, including
19mitigation, in City of Warren

 

20Project Allocation

1,800,000

21(Base Project Allocation - $1,620,000)

 

22(Design & Contingencies - $180,000)

 

23(xii) <-(xvi) Wayne County

 

24(A) Funding for White Mills channel
25improvement project, including
26rehabilitation and mitigation along
27Lollipop Creek, at White Mills
28Village, Texas Township

 

29Project Allocation

540,000

30(Base Project Allocation - $486,000)

 

1(Design & Contingencies - $54,000)

 

2(xiii) <-(xvii) Westmoreland County

 

3(A) Rehabilitate existing flood
4protection along Jacks Run, including
5levee rehabilitation, slope
6stabilization, flood wall repairs,
7concrete channel construction and
8replacement of three drainage
9structures in South Greensburg Borough

 

10Project Allocation

3,600,000

11(Base Project Allocation - $3,240,000)

 

12(Design & Contingencies - $360,000)

 

<-13(xiii.1) Westmoreland County

 

14(A) <-(B) Additional funding for DGS
15Project 182-7, flood protection in
16Jeannette City and Penn Borough

 

17Project Allocation

5,000,000

18(Base Project Allocation - $5,000,000)

 

<-19(C) Acquisition, construction,
20infrastructure and other related costs
21for flood plain improvements,
22retention ponds, retaining walls and
23acid mine mitigation sites in
24Murrysville Borough

 

25Project Allocation

750,000

26(Base Project Allocation - $750,000)

 

27(xiv) <-(xviii) Somerset and Fayette Counties

 

28(A) Rehabilitate 18 levee drainage
29structures along the Youghiogheny and
30Casselman Rivers, including

 

1mitigation, in Confluence Borough

 

2Project Allocation

4,050,000

3(Base Project Allocation - $3,645,000)

 

4(Design & Contingencies - $405,000)

 

5(xv) <-(xix) Chester, Delaware and Montgomery
6Counties

 

7(A) Regional watershed improvement
8project, including funding for ACE
9feasibility study

 

10Project Allocation

125,000

11(Base Project Allocation - $125,000)

 

12Section 8. Itemization of Keystone Recreation, Park and
13Conservation Fund projects.

14Projects in the category of public improvement projects to be
15constructed by the Department of Conservation and Natural
16Resources, its successors or assigns and to be financed by
17current revenues of the Keystone Recreation, Park and
18Conservation Fund are hereby itemized, together with their
19respective estimated costs, as follows:

20 

21Project

Total Project
Allocation

22(1) Department of Conservation and Natural
23Resources

 

24(i) Bald Eagle State Forest

 

25(A) Rehabilitate or replace Sand Mountain
26Trail

 

27Project Allocation

316,000

28(Base Project Allocation - $316,000)

 

29(B) Upgrade sewage treatment plant

 

30Project Allocation

500,000

1(Base Project Allocation - $500,000)

 

2(ii) Bald Eagle State Park

 

3(A) Renovate park office to meet
4accessibility requirements and improve
5visitor services

 

6Project Allocation

1,000,000

7(Base Project Allocation - $1,000,000)

 

8(iii) Blue Knob State Park

 

9(A) Pave and replace culverts at Willow
10Springs Road

 

11Project Allocation

250,000

12(Base Project Allocation - $250,000)

 

13(iv) Buchanan State Forest

 

14(A) Construct Buchanan Resource
15Management Center

 

16Project Allocation

1,750,000

17(Base Project Allocation - $1,750,000)

 

18(v) Caledonia State Park

 

19(A) Replace shower houses and comfort
20stations in Chinquapin Hill Campground
21and renovate campsites

 

22Project Allocation

1,300,000

23(Base Project Allocation - $1,300,000)

 

24(vi) Codorus State Park

 

25(A) Replace sailboat areas and restrooms
26and rehabilitate sewage system

 

27Project Allocation

450,000

28(Base Project Allocation - $450,000)

 

29(vii) Cook Forest State Park

 

30(A) Rehabilitate water storage tanks,

 

1including cleaning, painting,
2replacing level controls and
3maintenance access

 

4Project Allocation

600,000

5(Base Project Allocation - $600,000)

 

6(B) Repair sewage line inflow and
7infiltration

 

8Project Allocation

250,000

9(Base Project Allocation - $250,000)

 

10(viii) Cook State Forest

 

11(A) Replace sewage lines

 

12Project Allocation

175,000

13(Base Project Allocation - $175,000)

 

14(ix) Delaware Canal State Park

 

15(A) Replace Ferry Street Bridge

 

16Project Allocation

900,000

17(Base Project Allocation - $900,000)

 

18(B) Replace Smithtown Bridge No. 5

 

19Project Allocation

800,000

20(Base Project Allocation - $800,000)

 

21(C) Replace or rehabilitate Phillips
22Mills, Smithtown No. 3 and Lower
23Limeport Bridges

 

24Project Allocation

1,200,000

25(Base Project Allocation - $1,200,000)

 

26(D) Replace culverts on Rabbit Run

 

27Project Allocation

750,000

28(Base Project Allocation - $750,000)

 

29(E) Reconstruct canal overflows along
30canal

 

1Project Allocation

1,000,000

2(Base Project Allocation - $1,000,000)

 

3(x) Denton Hill State Park

 

4(A) Upgrade, rehabilitation or
5replacement of ski lift, lighting,
6equipment, parking and structures to
7improve operations and safety to
8public

 

9Project Allocation

750,000

10(Base Project Allocation - $750,000)

 

11(xi) Evansburg State Park

 

12(A) Replace sewer lines throughout park

 

13Project Allocation

480,000

14(Base Project Allocation - $480,000)

 

15(xii) Frances Slocum State Park

 

16(A) Demolish sewage treatment plant and
17construct municipal sewer connection

 

18Project Allocation

900,000

19(Base Project Allocation - $900,000)

 

20(xii.1) French Creek State Park

 

21(A) Construct Schuylkill River Trail
22connection

 

23Project Allocation

600,000

24(Base Project Allocation - $600,000)

 

25(xiii) Gifford Pinchot State Park

 

26(A) Rehabilitate five shower houses

 

27Project Allocation

1,500,000

28(Base Project Allocation - $1,500,000)

 

29(xiv) Hickory Run State Park

 

30(A) Replace pit latrines with modern

 

1comfort stations in two organized
2group camps

 

3Project Allocation

2,200,000

4(Base Project Allocation - $2,200,000)

 

5(xv) Hills Creek State Park

 

6(A) Rehabilitate sewage treatment plant,
7sewer lines and lift stations

 

8Project Allocation

250,000

9(Base Project Allocation - $250,000)

 

10(B) Replace campground washhouses

 

11Project Allocation

2,500,000

12(Base Project Allocation - $2,500,000)

 

13(xvi) Lackawanna State Park

 

14(A) Rehabilitate pool complex and day use
15area, including renovation of bath
16houses and addition of space for
17lifeguard and first aid station

 

18Project Allocation

3,000,000

19(Base Project Allocation - $3,000,000)

 

20(xvi.1) Lackawanna State Forest

 

21(A) Construct pole building for equipment
22storage at Thornhurst

 

23Project Allocation

244,000

24(Base Project Allocation - $244,000)

 

25(xvii) Laurel Ridge State Park

 

26(A) Replace Laurel Highlands Hiking Trail
27Bridge within the park and construct
28horse trail and parking/camping
29facilities at Bakers Run

 

30Project Allocation

1,600,000

1(Base Project Allocation - $1,600,000)

 

2(xvii.1) Lehigh Gorge State Park

 

3(A) Replace Drake's Creek Bridge No. 0508

 

4Project Allocation

300,000

5(Base Project Allocation - $300,000)

 

6(B) Repair Glen Onoko Bridge, Phase 1

 

7Project Allocation

300,000

8(Base Project Allocation - $300,000)

 

9(C) Replace Bald Mountain Bridge

 

10Project Allocation

250,000

11(Base Project Allocation - $250,000)

 

12(xviii) Little Pine State Park

 

13(A) Rehabilitate shooting range to meet
14current safety and accessibility
15standards

 

16Project Allocation

400,000

17(Base Project Allocation - $400,000)

 

18(xviii.1) Locust Lake State Park

 

19(A) Rehabilitate sewage treatment plant

 

20Project Allocation

300,000

21(Base Project Allocation - $300,000)

 

22(xix) Loyalsock State Forest

 

23(A) Rehabilitate Hillsgrove Ranger
24Station equipment storage shed

 

25Project Allocation

525,000

26(Base Project Allocation - $525,000)

 

27(B) Repair Pleasant Stream Road

 

28Project Allocation

200,000

29(Base Project Allocation - $200,000)

 

30(C) Repair Sones Pond Dam, including

 

1replacing outlet structure and
2repairing embankment

 

3Project Allocation

300,000

4(Base Project Allocation - $300,000)

 

5(xix.1) Marsh Creek State Park

 

6(A) Emergency spillway concrete repairs
7at dam

 

8Project Allocation

450,000

9(Base Project Allocation - $450,000)

 

10(xix.2) Michaux State Forest

 

11(A) Construct equipment storage building

 

12Project Allocation

250,000

13(Base Project Allocation - $250,000)

 

14(xix.3) Park Region 3

 

15(A) Replace HVAC system and upgrade ADA
16accessibility at regional office

 

17Project Allocation

200,000

18(Base Project Allocation - $200,000)

 

19(xx) Moraine State Park

 

20(A) Upgrade sewage treatment plant

 

21Project Allocation

3,500,000

22(Base Project Allocation - $3,500,000)

 

23(B) Rehabilitate and upgrade water
24treatment plant

 

25Project Allocation

1,500,000

26(Base Project Allocation - $1,500,000)

 

27(xxi) Nescopeck State Park

 

28(A) Construct culvert at Riley's Pond

 

29Project Allocation

600,000

30(Base Project Allocation - $600,000)

 

1(xxii) Nockamixon State Park

 

2(A) Replace pit latrines with modern
3comfort stations

 

4Project Allocation

650,000

5(Base Project Allocation - $650,000)

 

6(B) Replace boat rental docks

 

7Project Allocation

400,000

8(Base Project Allocation - $400,000)

 

9(xxiii) Ohiopyle State Park

 

10(A) Repair sewage collection system and
11sewage treatment plant to meet current
12effluent standards

 

13Project Allocation

3,500,000

14(Base Project Allocation - $3,500,000)

 

15(xxiv) Park Region 1

 

16(A) Renovate or replace HVAC system at
17regional office

 

18Project Allocation

250,000

19(Base Project Allocation - $250,000)

 

20(xxv) Presque Isle State Park

 

21(A) Provide for road flooding mitigation,
22Predisaster Mitigation Grant Project

 

23Project Allocation

400,000

24(Base Project Allocation - $400,000)

 

25(B) Replace sand mound Phase 4 B11 and
26B10

 

27Project Allocation

250,000

28(Base Project Allocation - $250,000)

 

29(xxvi) Prince Gallitzin State Park

 

30(A) Rehabilitate Beaver Valley Marina

 

1Project Allocation

3,000,000

2(Base Project Allocation - $3,000,000)

 

3(xxvii) Pymatuning State Park

 

4(A) Connect Jamestown sewage to sewer
5authority

 

6Project Allocation

500,000

7(Base Project Allocation - $500,000)

 

8(B) Demolish sewage treatment plant at
9Linesville

 

10Project Allocation

250,000

11(Base Project Allocation - $250,000)

 

12(C) Rehabilitate Linesville Livery

 

13Project Allocation

2,000,000

14(Base Project Allocation - $2,000,000)

 

15(xxviii) Ricketts Glen State Park

 

16(A) Replace pit latrine along Route 118
17with modern flush facility

 

18Project Allocation

400,000

19(Base Project Allocation - $400,000)

 

20(B) Replace dam controls and outlet works

 

21Project Allocation

800,000

22(Base Project Allocation - $800,000)

 

23(C) Reconstruct main park road and
24parking lots with repaving

 

25Project Allocation

750,000

26(Base Project Allocation - $750,000)

 

27(xxix) Ridley Creek State Park

 

28(A) Renovate mansion kitchen

 

29Project Allocation

250,000

30(Base Project Allocation - $250,000)

 

1(xxx) Salt Springs State Park

 

2(A) Replace existing sanitary station
3with new comfort station, including
4infrastructure

 

5Project Allocation

437,000

6(Base Project Allocation - $437,000)

 

7(xxxi) Shawnee State Park

 

8(A) Pave areas near and around
9campgrounds

 

10Project Allocation

250,000

11(Base Project Allocation - $250,000)

 

12(xxxii) Shikellamy State Park

 

13(A) Construct permanent causeway

 

14Project Allocation

1,500,000

15(Base Project Allocation - $1,500,000)

 

16(B) Replace Bag Nos. 6 and 7 and
17construct permanent causeway

 

18Project Allocation

1,000,000

19(Base Project Allocation - $1,000,000)

 

20(xxxiii) Sinnemahoning State Park

 

21(A) Rehabilitate dam gates operators,
22including electrical repairs

 

23Project Allocation

250,000

24(Base Project Allocation - $250,000)

 

25(B) Rehabilitate access roadway to
26visitors' center

 

27Project Allocation

250,000

28(Base Project Allocation - $250,000)

 

29(xxxiv) Sproul State Forest

 

30(A) Rehabilitate Baker's Run horse

 

1trailer parking/camping

 

2Project Allocation

250,000

3(Base Project Allocation - $250,000)

 

4(B) Rehabilitate Baker's Run boat launch
5and canoe access

 

6Project Allocation

200,000

7(Base Project Allocation - $200,000)

 

8(C) Construct Hyner hang gliding landing
9strip within park

 

10Project Allocation

225,000

11(Base Project Allocation - $225,000)

 

12(xxxv) Susquehannock State Park

 

13(A) Rehabilitate roads and drainage and
14pave main park roads

 

15Project Allocation

250,000

16(Base Project Allocation - $250,000)

 

17(xxxvi) Tiadaghton State Forest

 

18(A) Relocate Trout Run Road

 

19Project Allocation

225,000

20(Base Project Allocation - $225,000)

 

21(B) Construct trail bridge along Black
22Forest Trail over Slate Run

 

23Project Allocation

200,000

24(Base Project Allocation - $200,000)

 

25(xxxvi.1) Tioga State Forest

 

26(A) Upgrade to Pine Creek Trail and 287
27at-grade trail crossing

 

28Project Allocation

175,000

29(Base Project Allocation - $175,000)

 

30(xxxvii) Tobyhanna State Park

 

1(A) Pave roads throughout park

 

2Project Allocation

350,000

3(Base Project Allocation - $350,000)

 

4(xxxviii) Weiser State Forest

 

5(A) Construct Weiser Resource Management
6Center

 

7Project Allocation

3,300,000

8(Base Project Allocation - $3,300,000)

 

9(xxxix) Worlds End State Park

 

10(A) Reconstruct cabin area access

 

11Project Allocation

2,000,000

12(Base Project Allocation - $2,000,000)

 

13(xl) Yellow Creek State Park

 

14(A) Rehabilitate beach area buildings

 

15Project Allocation

600,000

16(Base Project Allocation - $600,000)

 

17Section 9. Itemization of State forestry bridge projects.

18Projects in the category of State forestry bridge projects to
19be constructed by the Department of Conservation and Natural
20Resources, its successors or assigns, and to be financed by oil
21company franchise tax revenues pursuant to 75 Pa.C.S. §
229502(a)(2)(iv) (related to imposition of tax) are hereby
23itemized, together with their respective estimated costs, as
24follows:

25 

26Project

Total Project
Allocation

27(1) Cameron County

 

28(i) Elk State Forest

 

29(A) Rehabilitate Whitehead Road/Whitehead
30Run - 9000

 

1Project Allocation

250,000

2(Base Project Allocation - $250,000)

 

3(B) Replace bridge on Whitehead Road over
4Whitehead Run

 

5Project Allocation

250,000

6(Base Project Allocation - $250,000)

 

7(C) Replace bridge on Naval Hollow Road
8over Naval Hollow Creek

 

9Project Allocation

150,000

10(Base Project Allocation - $150,000)

 

11(D) Replace bridge on Ford -
12administration road over East Branch
13of Hicks Run

 

14Project Allocation

250,000

15(Base Project Allocation - $250,000)

 

16(E) Replace bridge on Bell Draft Road
17over McDonald Run

 

18Project Allocation

300,000

19(Base Project Allocation - $300,000)

 

20(F) Replace bridge on Bell Draft Road
21over Bell Draft Run

 

22Project Allocation

200,000

23(Base Project Allocation - $200,000)

 

24(G) Replace bridge on Bell Draft Road
25over Shaffer Draft

 

26Project Allocation

150,000

27(Base Project Allocation - $150,000)

 

28(2) Centre County

 

29(i) Moshannon State Forest

 

30(A) Replace Shirks Road over Black

 

1Moshannon Creek Bridge No. 9-0028

 

2Project Allocation

300,000

3(Base Project Allocation - $300,000)

 

4(B) Replace Clay Mine Road over Six Mile
5Run - No. 0029 bridge and Huckleberry
6Road over Black Moshannon Creek - No.
70016

 

8Project Allocation

700,000

9(Base Project Allocation - $700,000)

 

10(3) Clarion County

 

11(i) Kittanning State Forest

 

12(A) Replace bridge on Corbett Road over
13Little Clear Creek and bridge on
14Corbett Road over Clear Creek

 

15Project Allocation

400,000

16(Base Project Allocation - $400,000)

 

17(4) Clearfield County

 

18(i) Moshannon State Forest

 

19(A) Replace bridge on Laurel Ridge Road
20over Laurel Run and bridge on Jack
21Dent Road over Medix Run

 

22Project Allocation

650,000

23(Base Project Allocation - $650,000)

 

24(B) Replace bridge on Ames Road over Deer
25Creek

 

26Project Allocation

200,000

27(Base Project Allocation - $200,000)

 

28(5) Clinton County

 

29(i) Sproul State Forest

 

30(A) Replace Beaver Dam Road over left

 

1fork of Beaver Dam Run

 

2Project Allocation

400,000

3(Base Project Allocation - $400,000)

 

4(B) Replace culvert at Little Greenlick
5Road over Little Greenlick Run

 

6Project Allocation

250,000

7(Base Project Allocation - $250,000)

 

8(C) Replace Birch Island Road over Amos
9Branch Bridge No. 10-0040

 

10Project Allocation

300,000

11(Base Project Allocation - $300,000)

 

12(D) Replace State Line Road over Beauty
13Run Bridge No. 10-0029

 

14Project Allocation

325,000

15(Base Project Allocation - $325,000)

 

16(E) Replace bridge on Graham Road over
17Ferney Road

 

18Project Allocation

200,000

19(Base Project Allocation - $200,000)

 

20(F) Replace bridge on Penrose Road over
21box culvert, near intersection with
22Coon Run Road

 

23Project Allocation

150,000

24(Base Project Allocation - $150,000)

 

25(G) Replace bridge on Birch Island Road
26over Amos Branch

 

27Project Allocation

175,000

28(Base Project Allocation - $175,000)

 

29(H) Replace bridge on Slate Line Road
30over Beauty Run

 

1Project Allocation

200,000

2(Base Project Allocation - $200,000)

 

3(I) Replace bridge on Birch Island Road
4over Amos Branch

 

5Project Allocation

175,000

6(Base Project Allocation - $175,000)

 

7(6) Elk County

 

8(i) Elk State Forest

 

9(A) Replace Dents Run Road over Bear
10Hollow No. 13-9005 and Weatherboard
11Run No. 13-9006

 

12Project Allocation

500,000

13(Base Project Allocation - $500,000)

 

14(B) Replace Bridge No. 13-9025, Little
15Dents Road over Little Dents Run

 

16Project Allocation

200,000

17(Base Project Allocation - $200,000)

 

18(7) Huntingdon County

 

19(i) Rothrock State Forest

 

20(A) Replace old culvert at Laurel Run
21Road with box culvert over tributary
22to Galbraith Gap Run

 

23Project Allocation

100,000

24(Base Project Allocation - $100,000)

 

25(B) Rehabilitate bridge at Crowfield Road
26over Standing Stone Creek

 

27Project Allocation

150,000

28(Base Project Allocation - $150,000)

 

29(C) Replace pipe culvert at Thickhead
30Mountain Road over Sinking Creek

 

1Project Allocation

200,000

2(Base Project Allocation - $200,000)

 

3(D) Replace three small box culverts at
4Martin and Frew Roads

 

5Project Allocation

500,000

6(Base Project Allocation - $500,000)

 

7(E) Replace bridge at Beidler Road over
8Laurel Run

 

9Project Allocation

350,000

10(Base Project Allocation - $350,000)

 

11(F) Replace bridge on Lingle Valley Road
12over Laurel Creek

 

13Project Allocation

350,000

14(Base Project Allocation - $350,000)

 

15(G) Replace bridges on Martin Gap Road 1
16and 2 and on Frew Road

 

17Project Allocation

600,000

18(Base Project Allocation - $600,000)

 

19(H) Replace bridge on Diamond Valley Road
20over Globe Run, No. 5-0023, No. 24

 

21Project Allocation

400,000

22(Base Project Allocation - $400,000)

 

23(I) Replace bridge on Crowfield Road over
24Standing Stone Creek

 

25Project Allocation

150,000

26(Base Project Allocation - $150,000)

 

27(J) Replace bridge on Thickhead Mountain
28Road over Sinking Creek

 

29Project Allocation

200,000

30(Base Project Allocation - $200,000)

 

1(K) Replace bridge on Laurel Run Road
2over tributary to Galbraith Gap Run

 

3Project Allocation

175,000

4(Base Project Allocation - $175,000)

 

5(L) Install guiderail at seven bridges

 

6Project Allocation

350,000

7(Base Project Allocation - $350,000)

 

8(8) Lycoming County

 

9(i) Tiadaghton State Forest

 

10(A) Replace Four Frances Road/Slate Run
11Road structures

 

12Project Allocation

800,000

13(Base Project Allocation - $800,000)

 

14(B) Replace Limbaugh Road over English
15Run culvert

 

16Project Allocation

225,000

17(Base Project Allocation - $225,000)

 

18(C) Replace Bridge No. 16-0001 on Spoor
19Hollow Road over Norris Brook

 

20Project Allocation

325,000

21(Base Project Allocation - $325,000)

 

22(ii) Tioga State Forest

 

23(A) Replace Owasse Road/Chimney Hollow

 

24Project Allocation

175,000

25(Base Project Allocation - $175,000)

 

26(B) Replace Cedar Mountain Road over
27Cedar Run Bridge No. 16-0014

 

28Project Allocation

300,000

29(Base Project Allocation - $300,000)

 

30(C) Replace Landrus Road at South Creek -

 

1No. 0023

 

2Project Allocation

325,000

3(Base Project Allocation - $325,000)

 

4(D) Replace Spoor Hollow Road over Norris
5Brook Bridge No. 16-0001

 

6Project Allocation

325,000

7(Base Project Allocation - $325,000)

 

8(E) Replace bridge on Zinck Fork Road
9over Upper Pine Bottom, No. 12-0047

 

10Project Allocation

250,000

11(Base Project Allocation - $250,000)

 

12(F) Replace bridges on Slate Run Road
13over Manor Fork No. 12-0041, Daugherty
14Run No. 12-9006 and culvert at Fill
15Trestle No. 12-9028

 

16Project Allocation

600,000

17(Base Project Allocation - $600,000)

 

18(G) Replace bridge on Cove Road over
19Fourth Gap

 

20Project Allocation

250,000

21(Base Project Allocation - $250,000)

 

22(H) Replace bridge on English Run Road
23over English Run

 

24Project Allocation

325,000

25(Base Project Allocation - $325,000)

 

26(I) Replace bridge on Lower Pine Road
27over Lower Pine Bottom Run

 

28Project Allocation

350,000

29(Base Project Allocation - $350,000)

 

30(9) Monroe County

 

1(i) Delaware State Forest

 

2(A) Replace bridge on Five Mile Meadow
3Road over unnamed creek and bridge on
4Five Mile Meadow Road over Little
5Bushkill Creek

 

6Project Allocation

300,000

7(Base Project Allocation - $300,000)

 

8(B) Replace bridge on Bald Hill Road over
9unnamed creek

 

10Project Allocation

280,000

11(Base Project Allocation - $280,000)

 

12(C) Replace bridge on Gunter Valley Road
13over Trout Run

 

14Project Allocation

200,000

15(Base Project Allocation - $200,000)

 

16(D) Replace Gunter Valley box culvert

 

17Project Allocation

200,000

18(Base Project Allocation - $200,000)

 

19(10) Perry County

 

20(i) Tuscarora State Forest

 

21(A) Replace bridge over Couch Road

 

22Project Allocation

150,000

23(Base Project Allocation - $150,000)

 

24(B) Replace bridge at Colonel Denning
25Road over Doubling Gap Creek

 

26Project Allocation

175,000

27(Base Project Allocation - $175,000)

 

28(C) Replace bridge on Gunter Valley Road
29over Trout Run

 

30Project Allocation

200,000

1(Base Project Allocation - $200,000)

 

2(D) Replace Meadow Run Road Bridge over
3Laurel Run

 

4Project Allocation

300,000

5(Base Project Allocation - $300,000)

 

6(E) Replace bridge on Couch Road

 

7Project Allocation

150,000

8(Base Project Allocation - $150,000)

 

9(F) Replace bridge on Gunter Valley

 

10Project Allocation

200,000

11(Base Project Allocation - $200,000)

 

12(G) Replace bridge on access road for
13Colonel Denning over Doubling Gap
14Creek

 

15Project Allocation

175,000

16(Base Project Allocation - $175,000)

 

17(11) Potter County

 

18(i) Elk State Forest

 

19(A) Replace structures for Bridge No. 13-
200045, East Cowley Run Road over East
21Cowley Run

 

22Project Allocation

300,000

23(Base Project Allocation - $300,000)

 

24(ii) Susquehannock State Forest

 

25(A) Replace Bridge No. 15-9013, Nelson
26Run Road over Gas Well Hollow

 

27Project Allocation

200,000

28(Base Project Allocation - $200,000)

 

29(12) Schuylkill County

 

30(i) Weiser State Forest

 

1(A) Construct a roadway and culvert over
2stream at Jefferson Tract and Road in
3South Manheim Township

 

4Project Allocation

200,000

5(Base Project Allocation - $200,000)

 

6(B) Replace White Oak Road over Wolf Run
7and Mud Run and Lykens Road - No. 9000

 

8Project Allocation

400,000

9(Base Project Allocation - $400,000)

 

10(C) Construct culvert at Weaver Road,
11Second Mountain over unnamed tributary

 

12Project Allocation

200,000

13(Base Project Allocation - $200,000)

 

14(D) Replace bridge on Jefferson Tract and
15Road

 

16Project Allocation

200,000

17(Base Project Allocation - $200,000)

 

18(E) Replace bridge on Weaver Road, Second
19Mountain over ford crossing

 

20Project Allocation

200,000

21(Base Project Allocation - $200,000)

 

22(F) Replace bridges on White Oak over
23Wolf Run and White Oak over Mud Run

 

24Project Allocation

400,000

25(Base Project Allocation - $400,000)

 

26(G) Replace bridges on Roaring Creek
27Tract

 

28Project Allocation

700,000

29(Base Project Allocation - $700,000)

 

30(H) Construct Weaver Road ford crossing

 

1box culvert

 

2Project Allocation

200,000

3(Base Project Allocation - $200,000)

 

4(13) Somerset County

 

5(i) Forbes State Forest

 

6(A) Replace three bridges at South Wolf
7Rock Road

 

8Project Allocation

600,000

9(Base Project Allocation - $600,000)

 

10(B) Rehabilitate Jones Mill Run Road and
11Blue Hole Road bridges, widen roads
12and replace deck bridge with precast
13box culvert

 

14Project Allocation

600,000

15(Base Project Allocation - $600,000)

 

16(C) Replace box culvert, bridge and
17roadway on South Wolfe Rock Road

 

18Project Allocation

800,000

19(Base Project Allocation - $800,000)

 

20(ii) Gallitzin State Forest

 

21(A) Replace culvert at Shade Road over
22unnamed tributary to Shade Creek

 

23Project Allocation

250,000

24(Base Project Allocation - $250,000)

 

25(14) Sullivan County

 

26(i) Loyalsock State Forest

 

27(A) Rehabilitate Yellow Dog Road over
28Rock Run - No. 0017

 

29Project Allocation

350,000

30(Base Project Allocation - $350,000)

 

1(B) Rehabilitate Hillsgrove Road over
2tributary to Pleasant Stream, No. 12-
39018

 

4Project Allocation

250,000

5(Base Project Allocation - $250,000)

 

6(C) Replace Bridge No. 20-9011, High Knob
7Road over Ketchum Run

 

8Project Allocation

250,000

9(Base Project Allocation - $250,000)

 

10(D) Replace bridge on Rock Run Road over
11Loyalsock Creek

 

12Project Allocation

300,000

13(Base Project Allocation - $300,000)

 

14(15) Tioga County

 

15(i) Tioga State Forest

 

16(A) Replace bridge on Cedar Mountain Road
17over Cedar Mountain Run

 

18Project Allocation

300,000

19(Base Project Allocation - $300,000)

 

20(B) Replace bridge on Owasee Road over
21Chimney Hollow

 

22Project Allocation

175,000

23(Base Project Allocation - $175,000)

 

24(C) Replace bridge on Spoor Hollow Road
25over Norris Brook

 

26Project Allocation

325,000

27(Base Project Allocation - $325,000)

 

28(D) Replace bridge on Landrus Road over
29South Creek

 

30Project Allocation

325,000

1(Base Project Allocation - $325,000)

 

2(16) Union County

 

3(i) Bald Eagle State Forest

 

4(A) Replace bridge on Bear Run Road over
5Bear Run Creek

 

6Project Allocation

250,000

7(Base Project Allocation - $250,000)

 

8(17) Westmoreland County

 

9(i) Forbes State Forest

 

10(A) Replace bridge on South Wolfe Rock
11Road over tributary to Tub Mill Run
12and bridge on South Wolfe Rock Road
13over Tub Mill Run

 

14Project Allocation

600,000

15(Base Project Allocation - $600,000)

 

16Section 10. Itemization of State ATV/Snowmobile Fund current
17revenue projects.

18Projects in the category of State ATV/Snowmobile Fund
19projects to be constructed by the Department of Conservation and
20Natural Resources, its successors or assigns, and to be financed
21from State ATV/Snowmobile Fund current revenue are hereby
22itemized, together with their respective estimated costs, as
23follows:

24 

25Project

Total Project
Allocation

26(1) Monroe County

 

27(i) Delaware State Forest

 

28(A) Construct or rehabilitate ATV trail
29in Dixon Miller Recreation Area

 

30Project Allocation

250,000

1(Base Project Allocation - $250,000)

 

2Section 11. Itemization of Pennsylvania Fish and Boat
3Commission capital projects.

4The individual capital projects in the category of public
5improvements projects to be acquired or developed by the
6Pennsylvania Fish and Boat Commission and to be financed by the
7incurring of debt or by the current revenues of the Fish Fund
8and the Boat Fund pursuant to executive authorizations are
9hereby itemized, together with their respective estimated costs,
10as follows:

11 

12Project

Total Project
Allocation

13(1)  Pennsylvania Fish and Boat Commission

 

<-14(i)  Beaver County

 

15(A)  Construction and other related costs
16for the Hereford Manor Dams

 

17Project Allocation

7,500,000

18(i) (i.1)<-  Berks County

 

19(A)  Design, permit and construct a
20rehabilitated dam to meet current dam
21safety requirements, Kaercher Creek
22(PA 478)

 

23Project Allocation

5,063,000

24(ii)  Bucks County

 

25(A)  Design, permit and construct a
26rehabilitated dam to meet current dam
27safety requirements, Levittown Lake

 

28Project Allocation

1,875,000

29(iii)  Cambria County

 

30(A)  Design, permit and construct a

 

1rehabilitated dam to meet current dam
2safety requirements, Duman Lake

 

3Project Allocation

1,875,000

4(iv) Carbon County

 

5(A)  Additional funds to design, permit
6and construct a rehabilitated dam to
7meet current dam safety requirements,
8Mauch Chunk Lake (PA 462)

 

9Project Allocation

5,625,000

10(v)  Centre County

 

11(A)  Design, permit and breach Gap Dam

 

12Project Allocation

250,000

13(B)  Additional funds to construct a dam
14in the vicinity of Colyer Lake to meet
15current dam safety requirements

 

16Project Allocation

3,140,000

17(C)  Additional funds to replace or
18remodel Pleasant Gap Regional Office
19Buildings

 

20Project Allocation

2,375,000

21(D)  Additional funds to design,
22rehabilitate and construct buildings,
23effluent treatment and related
24infrastructure at Pleasant Gap

 

25Project Allocation

3,013,000

26(E)  Additional funds to design,
27rehabilitate and construct buildings,
28effluent treatment and related
29infrastructure at Benner Spring

 

30Project Allocation

5,044,000

1(F)  Additional funds to design,
2rehabilitate and construct buildings,
3effluent treatment and related
4infrastructure at Bellefonte

 

5Project Allocation

5,375,000

6(vi)  Columbia County

 

7(A)  Additional funds to design, permit
8and construct a rehabilitated dam to
9meet current dam safety requirements,
10Briar Creek Lake (PA 497)

 

11Project Allocation

6,875,000

12(vii)  Crawford County

 

13(A)  Additional funds to design, permit
14and construct a rehabilitated dam to
15meet current dam safety requirements,
16Tamarack Lake

 

17Project Allocation

11,097,000

18(viii) Cumberland County

 

19(A)  Design, permit and construct a
20rehabilitated dam to meet current dam
21safety requirements, Shaffer Mill Dam

 

22Project Allocation

625,000

23(B)  Design, permit and construct a
24rehabilitated dam to meet current dam
25safety requirements, Springfield
26Reservoir

 

27Project Allocation

625,000

28(ix) Erie County

 

29(A)  Design, permit and construct a
30rehabilitated dam to meet current dam

 

1safety requirements, Hatchery Dam

 

2Project Allocation

625,000

3(B)  Additional funds to design,
4rehabilitate and construct buildings,
5effluent treatment and related
6infrastructure at Fairview

 

7Project Allocation

734,000

8(C)  Design, permit and construct marina,
9outbuilding and effluent treatment
10facility improvements at Northeast

 

11Project Allocation

10,625,000

12(x) Fulton County

 

13(A)  Additional funds to design, permit
14and construct a rehabilitated dam to
15meet current dam safety requirements,
16Meadow Grounds Dam

 

17Project Allocation

2,188,000

18(xi) Indiana County

 

19(A)  Additional funds to design, permit
20and construct a rehabilitated dam to
21meet current dam safety requirements,
22Hemlock Lake (Straight Run Dam)

 

23Project Allocation

3,438,000

24(xii) Juniata County

 

25(A)  Additional funds to design,
26rehabilitate and construct fish-
27rearing facilities and related
28infrastructure, Van Dyke

 

29Project Allocation

2,875,000

30(xiii) Luzerne County

 

1(A)  Design, permit and breach the Mt.
2Springs 2 Dam

 

3Project Allocation

250,000

4(B)  Design, permit and construct a
5rehabilitated dam to meet current dam
6safety requirements, Lily Lake

 

7Project Allocation

313,000

8(C)  Additional funds to design, permit
9and construct a rehabilitated dam to
10meet current dam safety requirements,
11Harris Pond Dam

 

12Project Allocation

2,625,000

13(xiv) Lycoming County

 

14(A)  Additional funds to design, permit
15and construct a rehabilitated dam to
16meet current dam safety requirements,
17Rose Valley Lake

 

18Project Allocation

3,438,000

19(xv) Northampton County

 

20(A)  Additional funds to design, permit
21and construct a rehabilitated dam to
22meet current dam safety requirements,
23East Bangor Lake

 

24Project Allocation

557,000

25(xvi) Snyder County

 

26(A)  Additional funds to design, permit
27and construct a rehabilitated dam to
28meet current dam safety requirements,
29Walker Lake (PA 637)

 

30Project Allocation

7,688,000

1(xvii) Somerset County

 

2(A)  Additional funds to design, permit
3and construct a rehabilitated dam to
4meet current dam safety requirements,
5Somerset Lake

 

6Project Allocation

1,700,000

7(B)  Design, permit and construct a
8rehabilitated dam to meet current dam
9safety requirements, High Point Lake

 

10Project Allocation

8,250,000

11(xviii) Sullivan County

 

12(A)  Design, permit and construct a
13rehabilitated dam to meet current dam
14safety requirements, Hunters Lake
15Recreation Dam

 

16Project Allocation

1,250,000

17(xix) Susquehanna County

 

18(A)  Design, permit and construct a
19rehabilitated dam to meet current dam
20safety requirements, Stump Pond Dam
21(Purdy)

 

22Project Allocation

625,000

23(xx) Tioga County

 

24(A)  Additional funds to design, permit
25and construct a rehabilitated dam to
26meet current dam safety requirements,
27Beechwood Lake (PA 454)

 

28Project Allocation

6,188,000

29(xxi) Venango County

 

30(A)  Additional funds to design, permit

 

1and construct a rehabilitated dam to
2meet current dam safety requirements,
3Kahle Lake

 

4Project Allocation

4,825,000

5(xxii) Warren County

 

6(A)  Design, permit and construct a
7rehabilitated dam to meet current dam
8safety requirements, Browns Pond

 

9Project Allocation

625,000

10(xxiii) Wayne County

 

11(A)  Design, permit and construct a
12rehabilitated dam to meet current dam
13safety requirements, Douglas Pond

 

14Project Allocation

625,000

15(B)  Design, permit and construct a
16rehabilitated dam to meet current dam
17safety requirements, Long Pond

 

18Project Allocation

625,000

19(C)  Additional funds to permit and
20construct a rehabilitated dam to meet
21current dam safety requirements,
22Belmont Lake

 

23Project Allocation

1,188,000

24(D)  Additional funds to design, permit
25and construct a rehabilitated dam to
26meet current dam safety requirements,
27Lower Woods Pond

 

28Project Allocation

1,188,000

29(E)  Design, permit and construct a
30rehabilitated dam to meet current dam

 

1safety requirements, Miller Pond

 

2Project Allocation

6,563,000

3(F)  Design, permit and construct a
4rehabilitated dam to meet current dam
5safety requirements, White Oak Pond

 

6Project Allocation

6,563,000

7(xxiv) Wyoming County

 

8(A)  Design, permit and construct a
9rehabilitated dam to meet current dam
10safety requirements, Winola Lake

 

11Project Allocation

313,000

12Section 12. Itemization of Manufacturing Fund current revenue
13projects.

14The individual capital projects in the category of public
15improvement projects to be developed by the Department of
16General Services, its successors or assigns, for the Department
17of Corrections, and to be financed from current revenues of the
18Manufacturing Fund are hereby itemized, together with their
19respective estimated costs, as follows:

20 

21Project

Total Project

Allocation

22(1) Department of Corrections

 

23(i) State Correctional Institution at Forest

 

24(A) Interior construction of Correctional
25Institute building to provide for

26correctional incentives program

 

27Project Allocation

7,500,000

28(Base Project Allocation - $6,000,000)

 

29(Design & Contingencies - $1,500,000)

 

30Section 13. Itemization of Oil and Gas Lease Fund capital

1projects.

2The individual capital projects in the category of public
3improvement projects to be developed by the Department of
4Conservation and Natural Resources, its successors or assigns,
5and to be financed from current revenues of the Oil and Gas
6Lease Fund are hereby itemized, together with their respective
7estimated costs, as follows:

8 

9Project

Total Project
Allocation

10(1) Department of Conservation and Natural
11Resources

 

12(i) Codorus State Park

 

13(A) Construction of camping cottages
14within park

 

15Project Allocation

150,000

16(Base Project Allocation - $150,000)

 

17(ii) Ricketts Glen State Park

 

18(A) Construction of camping cottages
19within park

 

20Project Allocation

548,000

21(Base Project Allocation - $548,000)

 

22Section 14. Itemization of Environmental Stewardship Fund
23capital projects.

24The individual projects to be developed by the Department of
25Conservation and Natural Resources, its successors or assigns,
26and to be financed from current revenues of the Environmental
27Stewardship Fund are hereby itemized, together with their
28respective estimated costs, as follows:

29 

30Project

Total Project
Allocation

1(1) Department of Conservation and Natural
2Resources

 

3(i) Ridley Creek State Park

 

4(A) Construct equestrian riding facility

 

5Project Allocation

900,000

6(Base Project Allocation - $900,000)

 

<-7Section 15. Itemization of highway bridge projects.

8The individual capital projects in the category of highway
9bridge projects to be constructed by the Department of
10Transportation, its successors or assigns, and to be financed
11from current revenues or by the incurring of debt are hereby
12itemized, together with their respective estimated costs, as
13follows:

14 

15Project

Total Project
Allocation

16(1) Northumberland County

 

17(i) Local bridges (Reserved).

 

18(ii) State bridges

 

19(A) Tenth Street Bridge in Trevorton over
20Zerbe Run, Zerbe Township, Bridge
21Replacement

 

22Project Allocation

190,000

23(Base Project Allocation - $190,000)

 

24Section 15.1. Itemization of State Stores Fund current revenue<-
25projects.

26The individual capital projects in the category of public
27improvement projects to be developed by the Department of
28General Services, it successors or assigns, for the Pennsylvania
29Liquor Control Board, and to be financed from current revenues
30of the State Stores Fund are hereby itemized with their

1respective itemized costs as follows:

2 

3Project

Total Project
Allocation

4(1) Pennsylvania Liquor Control Board

 

5(i) Northwest Office Building

 

6(A) Replace security and fire detection
7systems at Northwest Office Building
8located on Forster Street

 

9Project Allocation

1,500,000

10(Base Project Allocation - $1,350,000)

 

11(Design & Contingencies - $150,000)

 

12(B) Install replacement windows
13throughout Northwest Office Building
14located at Forster Street

 

15Project Allocation

1,500,000

16(Base Project Allocation - $1,200,000)

 

17(Design & Contingencies - $300,000)

 

18(C) Masonry repointing and exterior
19repairs of Northwest Office Building
20located on Forster Street

 

21Project Allocation

1,000,000

22(Base Project Allocation - $900,000)

 

23(Design & Contingencies - $100,000)

 

24Section 16. Provisions relating to highway bridge projects.

25(a) Limitation on expenditure of funds.--The following shall
26apply to itemizations under section 15:

27(1) Any moneys derived from the incurring of debt shall
28be used solely for effecting the rehabilitation, replacement
29or removal of bridges located on State highways. All other
30bridge rehabilitation, replacement or removal shall be

1financed from current revenue.

2(2) Notwithstanding any law to the contrary, the
3projects itemized in the act of December 8, 1982 (P.L.848,
4No.235), known as the Highway-Railroad and Highway Bridge
5Capital Budget Act for 1982-1983, may be financed from
6current revenue.

7(b) Allocation of funds.--As follows:

8(1) Whenever the Department of Transportation determines
9that the full estimated financial costs of the projects
10itemized in section 15 are not necessary for the proper
11design, acquisition or construction of such projects, the
12excess funds no longer required may be allocated by the
13Department of Transportation to increase the estimated costs
14of any one or more of the projects specifically itemized in a
15capital budget.

16(2) Moneys raised or expended by municipalities after
17the effective date of this act, in anticipation of receipt of
18funds authorized for projects itemized by this act, may be
19reimbursable to those municipalities.

20(c) Policy on jobs and materials.--As follows:

21(1) It is the declared policy of the Commonwealth that
22the construction projects authorized in section 15 be used,
23to the greatest extent possible, to provide for the creation
24of jobs and the rehiring of the unemployed in this
25Commonwealth. In order to reach this goal, firms with
26Commonwealth-based facilities shall be actively solicited to
27make bids on contracts to furnish products and materials,
28including, but not limited to, steel and steel products, to
29be used in these projects.

30(2) Every contract document entered into to undertake a

1project contained in section 15 shall provide that any steel
2or other products to be used or supplied in the performance
3of this contract shall be required to be manufactured by
4plants in the United States unless the secretary determines,
5on a contract-by-contract basis, that certain required
6products are not produced in the United States in sufficient
7quantities to meet the requirements of the contract. Such a
8determination and the reasons for the determination shall be
9published in the Pennsylvania Bulletin. Decisions made under
10this subsection shall not be inconsistent with the general
11provisions of the act of March 3, 1978 (P.L.6, No.3), known
12as the Steel Products Procurement Act.

13(3) Minorities and women.--It is also the declared
14policy of the Commonwealth to require and encourage
15substantial participation by minorities and women in the
16construction projects authorized in section 15.

17(d) Payment of capital debt service.--The repayment of any 
18debt incurred pursuant to section 15 shall be made from the 
19Highway Bridge Improvement Restricted Account and such repayment 
20shall have first claim on the revenues of the account.

21(e) Authorization and debt cumulation.--The additional
22authorization and debt allowance provided for in section 15
23shall be added to the total authorizations and debt incurred
24pursuant to the act of December 8, 1982 (P.L.848, No.235), known
25as the Highway-Railroad and Highway Bridge Capital Budget Act
26for 1982-1983, as amended and supplemented. Section 15 shall be
27construed as a supplement to the Highway-Railroad and Highway
28Bridge Capital Budget Act for 1982-1983.

29Section <-15 17. Debt authorization.

30(a) Public improvements.--The Governor, Auditor General and

1State Treasurer are hereby authorized and directed to borrow
2from time to time in addition to any authorization heretofore or
3hereafter enacted, on the credit of the Commonwealth, subject to
4the limitations provided in the current capital budget, money
5not exceeding in the aggregate the sum of $3,572,285,000<- 
6$3,897,449,000 $3,977,449,000 as may be found necessary to carry
7out the acquisition and construction of the public improvement
8projects specifically itemized in a capital budget.

9(b) Furniture and equipment.--The Governor, Auditor General
10and State Treasurer are hereby authorized and directed to borrow
11from time to time in addition to any authorization heretofore or
12hereafter enacted, on the credit of the Commonwealth, subject to
13the limitations provided in the current capital budget, money
14not exceeding in the aggregate the sum of $137,620,000<- 
15$138,120,000 $150,120,000 as may be found necessary to carry out
16the acquisition and construction of the public improvement
17projects consisting of the acquisition of original movable
18furniture and equipment specifically itemized in a capital
19budget.

20(c) Transportation assistance.--The Governor, Auditor
21General and State Treasurer are hereby authorized and directed
22to borrow from time to time in addition to any authorization
23heretofore or hereafter enacted, on the credit of the
24Commonwealth, subject to the limitations provided in the current
25capital budget, money not exceeding in the aggregate the sum of
26$1,718,429,000 $1,823,639,000 $1,846,939,000 as may be found
27necessary to carry out the acquisition and construction of the
28transportation assistance projects specifically itemized in a
29capital budget.

30(d) Redevelopment assistance.--Subject to the limitation in

1section 317(b) of the act of February 9, 1999 (P.L.1, No.1), 
2known as the Capital Facilities Debt Enabling Act, the Governor, 
3Auditor General and State Treasurer are hereby authorized and 
4directed to borrow from time to time in addition to any 
5authorization heretofore or hereafter enacted, on the credit of 
6the Commonwealth, subject to the limitations provided in the 
7current capital budget, money not exceeding in the aggregate the 
8sum of $3,965,614,000 $6,077,447,000 $6,438,618,000 as may be 
9found necessary to carry out the redevelopment assistance 
10capital projects specifically itemized in a capital budget.

11(e) Flood control.--The Governor, Auditor General and State
12Treasurer are hereby authorized and directed to borrow from time
13to time in addition to any authorization heretofore or hereafter
14enacted, on the credit of the Commonwealth, subject to the
15limitations provided in the current capital budget, money not
16exceeding in the aggregate the sum of $78,702,000<- $127,852,000 
17$137,852,000 as may be found necessary to carry out the
18acquisition and construction of the flood control projects
19specifically itemized in a capital budget.

20(f) Pennsylvania Fish and Boat Commission projects.--The
21Governor, Auditor General and State Treasurer are hereby
22authorized and directed to borrow from time to time in addition
23to any authorization heretofore or hereafter enacted, on the
24credit of the Commonwealth, subject to the limitations provided
25in the current capital budget, money not exceeding in the
26aggregate the sum of $128,741,000 as may be found necessary to
27carry out the acquisition and construction of the Pennsylvania
28Fish and Boat Commission projects specifically itemized in a
29capital budget.

<-30(g) Highway bridge projects.--The Governor, Auditor General

1and State Treasurer are hereby authorized and directed to borrow
2from time to time, in addition to any authorization heretofore
3or hereafter enacted, on the credit of the Commonwealth, subject
4to the limitations provided in the current capital budget, money
5not exceeding in the aggregate the sum of $190,000 as may be
6found necessary to carry out the acquisition and construction of
7the State projects specifically itemized in a capital budget.

8Section <-16 18. Issue of bonds.

9The indebtedness authorized in this act shall be incurred
10from time to time and shall be evidenced by one or more series
11of general obligation bonds of the Commonwealth in such
12aggregate principal amount for each series as the Governor, the
13Auditor General and the State Treasurer shall determine, but the
14latest stated maturity date shall not exceed estimated useful
15life of the projects being financed as stated in section <-14 19.

16Section <-17 19. Estimated useful life and term of debt.

17(a) Estimated useful life.--The General Assembly states that
18the estimated useful life of the public improvement projects
19itemized in this act is as follows:

20(1) Public improvement projects, 30 years.

21(2) Furniture and equipment projects, 10 years.

22(3) Transportation assistance projects:

23(i) Rolling stock, 15 years.

24(ii) Passenger buses, 12 years.

25(iii) Furniture and equipment, 10 years.

26(iv) All others, 30 years.

27(b) Term of debt.--The maximum term of the debt authorized
28to be incurred under this act is 30 years.

29Section <-18 20. Appropriations.

30(a) Public improvements.--The net proceeds of the sale of

1the obligations authorized in this act are hereby appropriated
2from the Capital Facilities Fund to the Department of General
3Services in the maximum amount of <-$3,572,285,000 $3,897,449,000 
<-4$3,977,449,000 to be used by it exclusively to defray the
5financial cost of the public improvement projects specifically
6itemized in a capital budget. After reserving or paying the
7expenses of the sale of the obligation, the State Treasurer
8shall pay to the Department of General Services the moneys as
9required and certified by it to be legally due and payable.

10(b) Furniture and equipment.--The net proceeds of the sale
11of the obligations authorized in this act are hereby
12appropriated from the Capital Facilities Fund to the Department
13of General Services in the maximum amount of $137,620,000<- 
14$138,120,000 $150,120,000<- to be used by it exclusively to defray
15the financial cost of the public improvement projects consisting
16of the acquisition of original movable furniture and equipment
17specifically itemized in a capital budget. After reserving or
18paying the expenses of the sale of the obligation, the State
19Treasurer shall pay to the Department of General Services the
20moneys as required and certified by it to be legally due and
21payable.

22(c) Transportation assistance.--The net proceeds of the sale
23of the obligations authorized in this act are hereby
24appropriated from the Capital Facilities Fund to the Department
25of Transportation in the maximum amount of $1,718,429,000<- 
26$1,<-823,639,000 $1,846,939,000 to be used by it exclusively to
27defray the financial cost of the transportation assistance
28projects specifically itemized in a capital budget. After
29reserving or paying the expenses of the sale of the obligation,
30the State Treasurer shall pay to the Department of

1Transportation the moneys as required and certified by it to be
2legally due and payable.

3(d) Redevelopment assistance.--The net proceeds of the sale
4of the obligations authorized in this act are hereby
5appropriated from the Capital Facilities Fund to the Department
6of Community and Economic Development in the maximum amount of
<-7$3,965,614,000 $6,077,447,000 $6,438,618,000 to be used by it
8exclusively to defray the financial cost of the redevelopment
9assistance capital projects specifically itemized in a capital
10budget. After reserving or paying the expenses of the sale of
11the obligation, the State Treasurer shall pay to the Department
12of Community and Economic Development the moneys as required and
13certified by it to be legally due and payable.

14(e) Flood control.--The net proceeds of the sale of the
15obligations authorized in this act are hereby appropriated from
16the Capital Facilities Fund to the Department of Environmental
17Protection in the maximum amount of <-$78,702,000 $127,852,000 
18$137,852,<-000 to be used by it exclusively to defray the
19financial cost of the flood control projects specifically
20itemized in a capital budget. After reserving or paying the
21expenses of the sale of the obligation, the State Treasurer
22shall pay to the Department of Environmental Protection the
23moneys as required and certified by it to be legally due and
24payable.

25(f) Pennsylvania Fish and Boat Commission projects.--The net
26proceeds of the sale of the obligations authorized in this act
27are hereby appropriated from the Capital Facilities Fund to the
28Pennsylvania Fish and Boat Commission in the maximum amount of
29$128,741,000 to be used by it exclusively to defray the
30financial cost of the Pennsylvania Fish and Boat Commission

1projects specifically itemized in a capital budget. After
2reserving or paying the expenses of the sale of the obligation,
3the State Treasurer shall pay to the Pennsylvania Fish and Boat
4Commission the moneys as required and certified by it to be
5legally due and payable.

<-6(g) Highway bridge projects.--The net proceeds of the sale
7of the obligations authorized in this act are hereby
8appropriated from the Capital Facilities Fund to the Department
9of Transportation in the maximum amount of $190,000 to be used
10by it exclusively to defray the financial costs of the highway
11bridge projects specifically itemized in this capital budget.
12After reserving or paying the expenses of the sale of the
13obligation, the State Treasurer shall pay out to the department
14the moneys as required and certified by it to be legally due and
15payable.

16Section <-19 21. Federal funds.

17(a) Projects itemized in this act.--In addition to those
18funds appropriated in section <-18 20, all moneys received from
19the Federal Government for the projects specifically itemized in
20this act are also hereby appropriated for those projects.

21(b) Projects not requiring itemization.--Department of
22Military and Veterans Affairs construction projects which are
23totally federally funded but which are to be administered by the
24Department of General Services are hereby authorized.

<-25Section 22. Delegation.

26For the public improvement projects specifically itemized in
27section 3(b)(2), the Department of General Services may delegate
28the authority to construct, improve, equip, furnish, maintain,
29acquire or operate such projects to the Philadelphia Regional
30Port Authority. Notwithstanding any provision of law to the

1contrary, the Philadelphia Regional Port Authority, at its
2discretion and subsequent to the aforementioned delegation, may
3contract with one or more of the tenant companies leasing or
4operating port facilities at the Port of Philadelphia for the
5purpose of constructing, improving, equipping, furnishing,
6maintaining, acquiring or operating the public improvement
7projects specifically itemized in section 3(b)(2). Any project
8itemized in section 3(b)(2) delegated to the Philadelphia
9Regional Port Authority for the purpose of constructing,
10improving, equipping, furnishing, maintaining, acquiring or
11operating the project shall be exempt from the section 1 first
12paragraph of the act of May 1, 1913 (P.L.155, No.104), referred 
13to as the Separations Act, and the provisions of the act of 
14March 3, 1978 (P.L.6, No.3), known as the Steel Products 
15Procurement Act, and any provisions of the law requiring the 
16bidding of projects.

17Section <-20 22 23. Editorial changes.

18In editing and preparing this act for printing following the
19final enactment, the Legislative Reference Bureau shall insert
20or revise letters or numbers for projects where the letters or
21numbers are missing or require revision. The bureau shall also
22revise the total monetary amounts for the total authorization,
23debt authorization, appropriations and departmental totals as
24necessary to agree with the total monetary amounts of the
25projects.

26Section <-21 23 24. Effective date.

27This act shall take effect immediately.