AN ACT

 

1Providing for the capital budget for fiscal year 2014-2015;
2itemizing public improvement projects, furniture and
3equipment projects, transportation assistance projects,
4redevelopment assistance capital projects, flood control
5projects, Keystone Recreation, Park and Conservation Fund
6projects, Environmental Stewardship Fund projects <-and, State
7forestry bridge projects<-, Motor License Fund projects and 
8Pennsylvania Fish and Boat Commission projects, to be
9constructed, acquired or assisted by the Department of
10General Services, the Department of Community and Economic
11Development, the Department of Conservation and Natural
12Resources, the Department of Environmental Protection or the
13Department of Transportation, <-the Pennsylvania Fish and Boat 
14Commission, together with their estimated financial costs;
15authorizing the incurring of debt without the approval of the
16electors for the purpose of financing the projects to be
17constructed, acquired or assisted by the Department of
18General Services, the Department of Community and Economic
19Development, <-the Department of Conservation and Natural 
20Resources, the Department of Environmental Protection <-or, the
21Department of Transportation<-; or the Pennsylvania Fish and 
22Boat Commission; authorizing the use of current revenue for 
23the purpose of financing the projects to be constructed, 
24acquired or assisted by the Department of Conservation and 
25Natural Resources or the Department of Transportation stating
26the estimated useful life of the projects; and providing for
27an exemption and for limitation on certain capital projects.

28The General Assembly of the Commonwealth of Pennsylvania
29hereby enacts as follows:

30Section 1. Short title.

1This act shall be known and may be cited as the Capital
2Budget Project Itemization Act of 2014-2015.

3Section 2. Total authorizations.

4(a) Public improvements.--The total authorization for the
5additional capital projects in the category of public
6improvement projects itemized in section 3 and to be acquired or
7constructed by the Department of General Services, its
8successors or assigns, and to be financed by the incurring of
9debt shall be $565,191,000 $949,966,000.<-

10(b) Furniture and equipment.--The total authorization for
11the additional capital projects in the category of public
12improvement projects consisting of the acquisition of original
13movable furniture and equipment to complete public improvement
14projects itemized in section 4 and to be acquired by the
15Department of General Services, its successors or assigns, and
16to be financed by the incurring of debt shall be $1,600,000<- 
17$19,600,000.<-

18(c) Transportation assistance.--The total authorization for
19the capital projects in the category of transportation
20assistance projects itemized in section 5 with respect to which
21an interest is to be acquired in or constructed by the
22Department of Transportation, its successors or assigns, and to
23be financed by the incurring of debt shall be $451,893,000<-
24$554,771,000.<-

25(d) Redevelopment assistance.--The total authorization for 
26the capital projects in the category of redevelopment assistance 
27capital projects itemized in section 6 for capital grants by the 
28Department of Community and Economic Development, its successors 
29or assigns, and to be financed by the incurring of debt, shall 
30be $787,027,000 $1,512,030,000<-.

1(e) Flood control.--The total authorization for the capital
2projects in the category of flood control projects itemized in
3section 7 and to be constructed by the Department of
4Environmental Protection, its successors or assigns, and to be
5financed by the incurring of debt, shall be $48,205,000<-
6$62,502,000.<-

7(f) Keystone Recreation, Park and Conservation Fund.--The
8total authorization for the capital projects in the category of
9public improvement projects itemized in section 8 and to be
10constructed by the Department of Conservation and Natural
11Resources, its successors or assigns, and to be financed from
12current revenues in the Keystone Recreation, Park and
13Conservation Fund shall be <-$20,015,000 $24,040,000.

14(g) Environmental Stewardship Fund current revenue
15projects.--The total authorization for the capital projects in
16the category of public improvement projects itemized in section
179 to be acquired or developed by the Department of Conservation
18and Natural Resources and to be financed by current revenues of
19the Environmental Stewardship Fund under executive authorization
20shall be $7,740,000 $13,840,000.<-

21(h) State forestry bridge projects.--The total authorization
22for the capital projects itemized in section 10 to be
23constructed by the Department of Conservation and Natural
24Resources, its successors or assigns, and to be financed by oil
25company franchise tax revenues under 75 Pa.C.S. § 9502(a)(2)(iv)
26(relating to imposition of tax) shall be $3,750,000 $9,060,000.<-

27(i) Motor License Fund current revenue projects.--The total
28authorization for the capital projects in the category of public
29improvement projects itemized in section 11 to be acquired or
30developed by the Department of Transportation and to be financed

1by current revenues of the Motor License Fund pursuant to
2executive authorization shall be $407,500,000.

<-3(j) Fish Fund and Boat Fund projects.--The total
4authorization for the capital projects in the category of public
5improvement projects itemized in section 11.1 to be acquired or
6developed by the Pennsylvania Fish and Boat Commission and to be
7financed by the incurring of debt or by current revenues of the
8Fish Fund and the Boat Fund pursuant to executive authorization
9shall be $15,093,000.

10Section 3. Itemization of public improvement capital projects.

11Additional capital projects in the category of public
12improvement projects to be constructed or acquired by the
13Department of General Services, its successors or assigns, and
14to be financed by the incurring of debt, are hereby itemized,
15together with their respective estimated financial costs, as
16follows:

17 

18Project

Total Project

Allocation

19(1) Department of Agriculture

 

20(i) Farm Show Complex

 

21(A) Provide for maintenance and upgrades
22to various sections of the Farm Show
23Complex <-facilities and grounds

 

24Project Allocation

14,000,000

25(Base Project Allocation -
26$12,600,000)

 

27(Design & Contingencies - $1,400,000)

 

28(2) Department of Conservation and Natural
29Resources

 

<-30(i) Bald Eagle State Forest

 

1(A) Breach and remove Stony Run Dam

 

2Project Allocation

3,000,000

3(Base Project Allocation - $3,000,000)

 

4(ii) Cowans Gap State Park

 

5(A) Construct a new park office and
6visitor center

 

7Project Allocation

6,000,000

8(Base Project Allocation - $6,000,000)

 

9(iii) Delaware Canal State Park

 

10(A) Rehabilitate the historic canal
11structure and various public
12facilities

 

13Project Allocation

28,000,000

14(Base Project Allocation -
15$28,000,000)

 

16(iv) Division of Forest Fire Protection,
17Luzerne County

 

18(A) Rebuild HaZLEton Air Operations
19Building, including site improvements

 

20Project Allocation

3,000,000

21(Base Project Allocation - $3,000,000)

 

22(v) Elk State Forest

 

23(A) Replace Brooks Run Forest Maintenance
24Headquarters and storage building

 

25Project Allocation

3,500,000

26(Base Project Allocation - $3,500,000)

 

27(B) Replace Hicks Run Forest Maintenance
28Headquarters

 

29Project Allocation

3,000,000

30(Base Project Allocation - $3,000,000)

 

1(vi) Lackawanna State Forest

 

2(A) Breach and remove Edgerton Dam

 

3Project Allocation

2,500,000

4(Base Project Allocation - $2,500,000)

 

5(vii) Michaux State Forest

 

6(A) Construct resource management center
7and storage building

 

8Project Allocation

8,000,000

9(Base Project Allocation - $8,000,000)

 

10(viii) Shikellamy State Park

 

11(A) Rehabilitate marina building and main
12marina area

 

13Project Allocation

3,000,000

14(Base Project Allocation - $3,000,000)

 

15(ix) Sproul State Forest

 

16(A) Replace Snow Shoe Forest Maintenance
17Headquarters

 

18Project Allocation

3,000,000

19(Base Project Allocation - $3,000,000)

 

20(x) Tiadaghton State Forest

 

21(A) Construct Hepburn Street Fishway

 

22Project Allocation

10,000,000

23(Base Project Allocation -
24$10,000,000)

 

25(i) <-(xi) Washington Crossing Historic Park

 

26(A) Construction and infrastructure
27improvements to comply with State Park
28standards

 

29Project Allocation

5,000,000

30(Base Project Allocation - $5,000,000)

 

1(3) Department of Corrections

 

2(i) State Correctional Institution at Albion

 

3(A) Replace all institutional cameras and
4system components and add cameras

 

5Project Allocation

1,875,000

6(Base Project Allocation - $1,500,000)

 

7(Design & Contingencies - $375,000)

 

8(B) Renovate or replace the institution's
9chilled water system, including
10chillers, cooling towers and other
11system components

 

12Project Allocation

1,875,000

13(Base Project Allocation - $1,500,000)

 

14(Design & Contingencies - $375,000)

 

15(ii) State Correctional Institution at
16Cambridge Springs

 

17(A) Replace current fire alarm system

 

18Project Allocation

1,250,000

19(Base Project Allocation - $1,000,000)

 

20(Design & Contingencies - $250,000)

 

21(iii) State Correctional Institution at Camp
22Hill

 

23(A) Install new gravity flow sewer lines
24and remove pumping systems

 

25Project Allocation

931,000

26(Base Project Allocation - $745,000)

 

27(Design & Contingencies - $186,000)

 

28(B) Construct replacement water
29purification plant

 

30Project Allocation

12,750,000

1(Base Project Allocation -
2$10,200,000)

 

3(Design & Contingencies - $2,550,000)

 

4(iv) State Correctional Institution at Forest

 

5(A) Renovate and paint the institution's
6water tower

 

7Project Allocation

575,000

8(Base Project Allocation - $460,000)

 

9(Design & Contingencies - $115,000)

 

10(B) Replace power inverter systems in
11various buildings

 

12Project Allocation

875,000

13(Base Project Allocation - $700,000)

 

14(Design & Contingencies - $175,000)

 

15(v) State Correctional Institution at Muncy

 

16(A) Replace automatic temperature
17controls for heating and air
18conditioning systems in various
19buildings

 

20Project Allocation

750,000

21(Base Project Allocation - $600,000)

 

22(Design & Contingencies - $150,000)

 

23(B) Construct new diagnostic
24classification center equipped with
25inmate cells, a medical section,
26psychology group area and feeding
27areas

 

28Project Allocation

27,500,000

29(Base Project Allocation -
30$22,000,000)

 

1(Design & Contingencies - $5,500,000)

 

2(vi) State Correctional Institution at Pine
3Grove

 

4(A) Provide for additional cameras and
5equipment

 

6Project Allocation

475,000

7(Base Project Allocation - $380,000)

 

8(Design & Contingencies - $95,000)

 

9(vii) State Correctional Institution at
10Waymart

 

11(A) Replace HVAC system in C Block and
12install independent controls

 

13Project Allocation

3,750,000

14(Base Project Allocation - $3,000,000)

 

15(Design & Contingencies - $750,000)

 

16(B) Replace HVAC system in Building No.1
17and install independent controls

 

18Project Allocation

2,500,000

19(Base Project Allocation - $2,000,000)

 

20(Design & Contingencies - $500,000)

 

21(4) Department of Education

 

<-22(i) Community College of Allegheny County

 

23(A) Infrastructure, renovation and
24related costs to advance the KINBER
25connectivity project at West Hills
26Center

 

27Project Allocation

250,000

28(Base Project Allocation - $250,000)

 

29(B) Construction, renovation and other
30related costs for Community College of

 

1Allegheny County Ridge Avenue
2Revitalization

 

3Project Allocation

11,300,000

4(Base Project Allocation -
5$11,300,000)

 

6(C) Construction, infrastructure,
7renovation, redevelopment and other
8related costs for electrical and
9network operations safety upgrades at
10the Community College of Allegheny
11County Boyce campus and Office of
12College Services

 

13Project Allocation

350,000

14(Base Project Allocation - $350,000)

 

15(D) Construction, infrastructure,
16renovation and other related costs to
17replace roofs and decks of library
18building at the Allegheny North Shore
19campus and to replace the building
20decks and drains at South Campus for
21buildings C and D

 

22Project Allocation

350,000

23(Base Project Allocation - $350,000)

 

24(E) Construction, infrastructure,
25renovation, redevelopment and other
26related costs to enhance facilities
27and upgrade information technology
28infrastructure at Community College of
29Allegheny County's Boyce Campus

 

30Project Allocation

125,000

1(Base Project Allocation - $125,000)

 

2(F) Construction, infrastructure,
3renovation, redevelopment and other
4related costs for science labs at the
5Community College of Allegheny County
6Boyce and South campuses

 

7Project Allocation

2,700,000

8(Base Project Allocation - $2,700,000)

 

9(ii) Lehigh Carbon Community College

 

10(A) Construction and related costs to
11construct and equip a veterinary
12teaching hospital

 

13Project Allocation

1,000,000

14(Base Project Allocation - $1,000,000)

 

15(i) <-(iii) Lincoln University

 

16(A) Renovate the Manuel Rivero Gymnasium

 

17Project Allocation

30,000,000

18(Base Project Allocation -
19$24,000,000)

 

20(Design & Contingencies - $6,000,000)

 

<-21(iv) Northampton Community College

 

22(A) Construction, infrastructure,
23renovation and related costs for the
24building of an addition to the current
25automotive technology training
26facility in Bethlehem Township

 

27Project Allocation

1,400,000

28(Base Project Allocation - $1,400,000)

 

29(B) Construction, infrastructure and
30related costs for the renovation of

 

1Hartzell Technology Hall in Bethlehem
2Township

 

3Project Allocation

1,000,000

4(Base Project Allocation - $1,000,000)

 

5(C) Construction, infrastructure and
6related costs to construct a
7conference center linked to the
8Hartzell Technology Hall and the
9Culinary school in Bethlehem Township

 

10Project Allocation

2,000,000

11(Base Project Allocation - $2,000,000)

 

12(D) Construction, infrastructure and
13related costs for a shell building to
14support lineworker training and fall
15protection training in Bethlehem
16Township

 

17Project Allocation

1,300,000

18(Base Project Allocation - $1,300,000)

 

19(ii) <-(v) The Pennsylvania State University

 

20(A) Rehabilitate the Hosler Building

 

21Project Allocation

42,000,000

22(Base Project Allocation -
23$35,000,000)

 

24(Design & Contingencies - $7,000,000)

 

25(B) Construction, infrastructure,
26redevelopment, renovation and related
27costs for pedestrian safety, public
28improvements, campus security upgrades
29and flood control improvements at Penn
30State Hershey Medical Center

 

1Project Allocation

25,000,000

2(Base Project Allocation -
3$25,000,000)

 

4(C) Construction, acquisition,
5redevelopment, renovation and related
6costs for student pedestrian safety,
7infrastructure improvements, campus
8security upgrades and flood control
9improvements to Pennsylvania State
10University Harrisburg Campus

 

11Project Allocation

20,000,000

12(Base Project Allocation -
13$20,000,000)

 

14(iii) <-(vi) Temple University

 

15(A) Purchase the old William Penn High
16School property for future growth

 

17Project Allocation

10,000,000

18(Base Project Allocation - $5,000,000)

 

19(Land Allocation - $4,000,000)

 

20(Design & Contingencies - $1,000,000)

 

21(iv) <-(vii) Thaddeus Stevens College of
22Technology

 

23(A) Expand the technology center to meet
24current and future demands

 

25Project Allocation

5,000,000

26(Base Project Allocation - $4,400,000)

 

27(Design & Contingencies - $600,000)

 

28(v) <-(viii) University of Pittsburgh

 

29(A) Provide for continued maintenance and
30upgrades on all campuses

 

1Project Allocation

20,000,000

2(Base Project Allocation -
3$16,000,000)

 

4(Design & Contingencies - $4,000,000)

 

5(B) Construction, infrastructure,
6redevelopment and other related costs
7for Hillman Library renovation

 

8Project Allocation

15,000,000

9(Base Project Allocation -
10$15,000,000)

 

11(C) Construction, infrastructure,
12redevelopment, renovation and other
13related costs for Schenley Quadrangle

 

14Project Allocation

20,000,000

15(Base Project Allocation -
16$20,000,000)

 

17(D) Construction, infrastructure,
18redevelopment, renovation and other
19related costs for new building

 

20Project Allocation

50,000,000

21(Base Project Allocation -
22$50,000,000)

 

23(E) Construction, infrastructure,
24redevelopment, renovation and other
25related costs for deferred maintenance

 

26Project Allocation

20,000,000

27(Base Project Allocation -
28$20,000,000)

 

29(F) Construction, infrastructure,
30redevelopment, renovation and other

 

1related costs for energy conservation
2initiatives

 

3Project Allocation

10,000,000

4(Base Project Allocation -
5$10,000,000)

 

6(G) Construction, infrastructure,
7redevelopment, renovation and other
8related costs for Clapp, Langley and
9Crawford Complex

 

10Project Allocation

25,000,000

11(Base Project Allocation -
12$25,000,000)

 

13(H) University of Pittsburgh, Bradford
14Campus renovation and infrastructure
15upgrades to Hanley Library

 

16Project Allocation

25,000,000

17(Base Project Allocation -
18$25,000,000)

 

19(5) Pennsylvania Emergency Management Agency

 

20(i) State Fire Academy

 

21(A) Expand <-Demolition and removal of 
22existing facility where necessary and 
23expand facility, including training
24space for unconventional gas drilling,
25props and gear parking and a memorial
26to fallen firefighters

 

27Project Allocation<-

5,000,000

28(Base Project Allocation - $4,000,000)

 

<-29Project Allocation

10,000,000

30(Base Project Allocation - $9,000,000)

 

1(Land Allocation - $500,000)

 

2(Design & Contingencies - $500,000)

 

3(ii) Western Area office building

 

4(A) Demolish current facility and
5construct new facility to meet current
6needs

 

7Project Allocation

3,350,000

8(Base Project Allocation - $3,000,000)

 

9(Design & Contingencies - $350,000)

 

10(6) Department of Environmental Protection

 

11(i) Bradford County

 

12(A) Provide additional funding for DGS
13Project 181-26

 

14Project Allocation

1,875,000

15(Base Project Allocation - $1,500,000)

 

16(Design & Contingencies - $375,000)

 

17(ii) Butler County

 

18(A) Provide additional funding for DGS
19Project 183-21

 

20Project Allocation

3,125,000

21(Base Project Allocation - $2,500,000)

 

22(Design & Contingencies - $625,000)

 

23(iii) Clearfield County

 

24(A) Provide additional funding for DGS
25Project 182-14

 

26Project Allocation

3,125,000

27(Base Project Allocation - $2,500,000)

 

28(Design & Contingencies - $625,000)

 

29(B) Provide additional funding for DGS
30Project 182-22

 

1Project Allocation

1,875,000

2(Base Project Allocation - $1,500,000)

 

3(Design & Contingencies - $375,000)

 

4(C) Provide additional funding for Orrs
5Run flood protection

 

6Project Allocation

1,875,000

7(Base Project Allocation - $1,500,000)

 

8(Design & Contingencies - $375,000)

 

9(iv) Lycoming County

 

10(A) Provide additional funding for
11Loyalsock Creek flood protection

 

12Project Allocation

6,250,000

13(Base Project Allocation - $5,000,000)

 

14(Design & Contingencies - $1,250,000)

 

15(v) Luzerne County

 

16(A) Provide additional funding for DGS
17Project 181-20

 

18Project Allocation

600,000

19(Base Project Allocation - $500,000)

 

20(Design & Contingencies - $100,000)

 

21(B) Provide flood protection for the town
22of Duryea, including rehabilitating
23the levee as well as watershed and
24channel improvements

 

25Project Allocation

4,000,000

26(Base Project Allocation - $3,200,000)

 

27(Design & Contingencies - $800,000)

 

28(vi) McKean County

 

29(A) Provide additional funding for DGS
30Project 182-10

 

1Project Allocation

6,875,000

2(Base Project Allocation - $5,500,000)

 

3(Design & Contingencies - $1,375,000)

 

4(vii) Northumberland County

 

5(A) Provide additional funding for DGS
6Project 182-19

 

7Project Allocation

1,875,000

8(Base Project Allocation - $1,500,000)

 

9(Design & Contingencies - $375,000)

 

10(viii) Tioga County

 

11(A) Provide additional funding for Camp
12Brook flood protection

 

13Project Allocation

6,250,000

14(Base Project Allocation - $5,000,000)

 

15(Design & Contingencies - $1,250,000)

 

16(7) Department of General Services

 

17(i) Dauphin County

 

18(A) Provide additional funding for DGS
19Project 948-81, Capitol Complex
20rehabilitation

 

21Project Allocation

5,000,000

22(Base Project Allocation - $4,000,000)

 

23(Design & Contingencies - $1,000,000)

 

24(B) Repair spalling concrete tunnel
25ceilings in the steam tunnels leading
26from the North Office Building to the
27South Office Building and the Central
28Plant

 

29Project Allocation

2,200,000

30(Base Project Allocation - $2,000,000)

 

1(Design & Contingencies - $200,000)

 

2(C) Replace existing interior lighting
3control system at the Keystone
4Building

 

5Project Allocation

385,000

6(Base Project Allocation - $350,000)

 

7(Design & Contingencies - $35,000)

 

8(D) Replace four generators located at
9the P2 level of the East Wing of the
10Capitol Complex

 

11Project Allocation

2,200,000

12(Base Project Allocation - $2,000,000)

 

13(Design & Contingencies - $200,000)

 

14(E) Renovate boiler 3 at the DGS Annex
15Central Plant

 

16Project Allocation

650,000

17(Base Project Allocation - $550,000)

 

18(Design & Contingencies - $100,000)

 

19(F) Renovations and repairs to the
20Arsenal Building

 

21Project Allocation

4,000,000

22(Base Project Allocation - $4,000,000)

 

23(G) Life/Safety upgrades at Labor and
24Industry Building

 

25Project Allocation

2,000,000

26(Base Project Allocation - $2,000,000)

 

27(H) Life/Safety upgrades at Health and
28Welfare Building

 

29Project Allocation

2,000,000

30(Base Project Allocation - $2,000,000)

 

1(I) Interior renovations within the East
2Wing Building

 

3Project Allocation

2,000,000

4(Base Project Allocation - $2,000,000)

 

<-5(J) Additional funding to renovate
6elevators in the Finance Building
7including motors and remodeling

 

8Project Allocation

1,200,000

9(Base Project Allocation - $1,200,000)

 

10(K) Additional funding to renovate
11elevators in the Forum Building
12including motors and remodeling

 

13Project Allocation

1,200,000

14(Base Project Allocation - $1,200,000)

 

15(8) Pennsylvania Historical and Museum
16Commission

 

17(i) State Archives Building

 

18(A) Acquire and renovate off-site
19building and renovate current site

 

20Project Allocation

30,000,000

21(Base Project Allocation -
22$30,000,000)

 

23(9) Department of Military and Veterans Affairs

 

<-24(i) Southwestern Veterans Center, Allegheny
25County

 

26(A) Additional funding to rehabilitate
27the Southwestern Veterans Center,
28including life safety and regulatory
29deficiencies

 

30Project Allocation

4,000,000

1(Base Project Allocation - $4,000,000)

 

2(i) <-(ii) Berks Readiness Center, Berks County

 

3(A) Provide for acquisition of land for
4new readiness center in Berks County

 

5Project Allocation

2,000,000

6(Land Allocation - $2,000,000)

 

<-7(iii) Hollidaysburg Veterans Home, Blair
8County

 

9(A) Additional funding to rehabilitate
10the Hollidaysburg Veterans Home,
11including life safety and regulatory
12deficiencies

 

13Project Allocation

4,000,000

14(Base Project Allocation - $4,000,000)

 

15(ii) <-(iv) Bucks Readiness Center, Bucks
16County

 

17(A) Provide for acquisition of land for
18new readiness center in Bucks County

 

19Project Allocation

3,500,000

20(Land Allocation - $3,500,000)

 

<-21(v) Southeastern Veterans Center, Chester
22County

 

23(A) Additional funding to rehabilitate
24the Southeastern Veterans Center,
25including life safety and regulatory
26deficiencies

 

27Project Allocation

4,000,000

28(Base Project Allocation - $4,000,000)

 

29(vi) Pennsylvania Soldiers' and Sailors'
30Home, Erie County

 

1(A) Additional funding to rehabilitate
2the Pennsylvania Soldiers' and
3Sailors' Home, including life safety
4and regulatory deficiencies

 

5Project Allocation

4,000,000

6(Base Project Allocation - $4,000,000)

 

7(vii) Gino J. Merli Veterans Center,
8Lackawanna County

 

9(A) Additional funding to rehabilitate
10Gino J. Merli Veterans Center,
11including life safety and regulatory
12deficiencies

 

13Project Allocation

4,000,000

14(Base Project Allocation - $4,000,000)

 

15(viii) Pennsylvania Veterans Memorial - Fort
16Indiantown Gap Veterans Cemetery, Lebanon
17County

 

18(A) Rehabilitate the Pennsylvania
19Veterans' Memorial located at Fort
20Indiantown Gap Veterans' Cemetery

 

21Project Allocation

3,600,000

22(Base Project Allocation - $3,600,000)

 

23(ix) Susquehanna Valley Community Education
24Project, Northumberland County

 

25(A) Construction, infrastructure,
26acquisition of equipment, renovation
27and related costs to establish a
28Pennsylvania community college in
29Northumberland County

 

30Project Allocation

1,500,000

1(Base Project Allocation - $1,500,000)

 

2(x) Delaware Valley Veterans Home,
3Philadelphia County

 

4(A) Additional funding to rehabilitate
5the Delaware Valley Veterans Home,
6including life safety and regulatory
7deficiencies

 

8Project Allocation

4,000,000

9(Base Project Allocation - $4,000,000)

 

10(iii) <-(xi) Eastern Central Readiness Center,
11various counties

 

12(A) Provide for acquisition of land for
13new readiness center in Carbon County
14or Schuylkill County

 

15Project Allocation

2,000,000

16(Land Allocation - $2,000,000)

 

17(iv) <-(xii) East North East Readiness Center,
18various counties

 

19(A) Provide for acquisition of land for
20new readiness center in Lehigh County
21or Northampton County

 

22Project Allocation

3,000,000

23(Land Allocation - $3,000,000)

 

24(v) <-(xiii) Northeastern Readiness Center,
25various counties

 

26(A) Provide for acquisition of land for
27new readiness center in Bradford
28County, Luzerne County or Wyoming
29County

 

30Project Allocation

2,000,000

1(Land Allocation - $2,000,000)

 

2(vi) <-(xiv) Western Readiness Center, various
3counties

 

4(A) Provide for acquisition of land for
5new readiness center in Allegheny
6County, Armstrong County or Butler
7County

 

8Project Allocation

2,000,000

9(Land Allocation - $2,000,000)

 

10(vii) <-(xv) West Northwest Readiness Center,
11various counties

 

12(A) Provide for acquisition of land for
13new readiness center in Lawrence
14County or Mercer County

 

15Project Allocation

2,000,000

16(Land Allocation - $2,000,000)

 

17(10) Department of Public Welfare

 

18(i) Clarks Summit State Hospital

 

19(A) Install new water line from
20chlorination building to two
21reservoirs

 

22Project Allocation

1,800,000

23(Base Project Allocation - $1,440,000)

 

24(Design & Contingencies - $360,000)

 

25(B) Upgrade current wastewater treatment
26plan

 

27Project Allocation

5,000,000

28(Base Project Allocation - $4,000,000)

 

29(Design & Contingencies - $1,000,000)

 

30(ii) Ebensburg Center

 

1(A) Replace water lines throughout
2facility

 

3Project Allocation

1,500,000

4(Base Project Allocation - $1,200,000)

 

5(Design & Contingencies - $300,000)

 

6(B) Install automatic electrical main
7switching system to existing
8facility's back-up generator system

 

9Project Allocation

2,000,000

10(Base Project Allocation - $1,600,000)

 

11(Design & Contingencies - $400,000)

 

12(iii) Loysville Youth Development Center

 

13(A) Replace existing fixtures and shutoff
14valves and add new hydrants throughout
15campus

 

16Project Allocation

700,000

17(Base Project Allocation - $560,000)

 

18(Design & Contingencies - $140,000)

 

19(iv) North Central Secure Treatment Unit

 

20(A) Replace flat rubber roof at facility

 

21Project Allocation

500,000

22(Base Project Allocation - $400,000)

 

23(Design & Contingencies - $100,000)

 

24(v) Polk Center

 

25(A) Replace elevators and controls in
26residential buildings

 

27Project Allocation

800,000

28(Base Project Allocation - $640,000)

 

29(Design & Contingencies - $160,000)

 

30(vi) Selinsgrove Center

 

1(A) Replace elevators and controls
2throughout facility

 

3Project Allocation

500,000

4(Base Project Allocation - $400,000)

 

5(Design & Contingencies - $100,000)

 

6(vii) South Mountain Secure Treatment Unit

 

7(A) Refurbish existing gymnasium shell,
8including HVAC and infrastructure

 

9Project Allocation

500,000

10(Base Project Allocation - $400,000)

 

11(Design & Contingencies - $100,000)

 

12(B) Replace current electrical
13distribution equipment, including
14panels, substations and switches

 

15Project Allocation

4,000,000

16(Base Project Allocation - $3,200,000)

 

17(Design & Contingencies - $800,000)

 

18(viii) Torrance State Hospital

 

19(A) Replace water filtration system and
20water treatment facility

 

21Project Allocation

6,000,000

22(Base Project Allocation - $4,800,000)

 

23(Design & Contingencies - $1,200,000)

 

24(ix) Warren State Hospital

 

25(A) Install HVAC

 

26Project Allocation

6,000,000

27(Base Project Allocation - $4,800,000)

 

28(Design & Contingencies - $1,200,000)

 

29(x) Wernersville State Hospital

 

30(A) Replace roofs on various buildings

 

1Project Allocation

2,500,000

2(Base Project Allocation - $2,000,000)

 

3(Design & Contingencies - $500,000)

 

4(xi) White Haven Center

 

5(A) Replace single-pane windows with
6energy-efficient windows on various
7buildings

 

8Project Allocation

2,500,000

9(Base Project Allocation - $2,000,000)

 

10(Design & Contingencies - $500,000)

 

11(11) Pennsylvania State Police

 

12(i) Reading Headquarters, Berks County

 

13(A) Design and construct new headquarters
14facility

 

15Project Allocation

11,450,000

16(Base Project Allocation - $8,500,000)

 

17(Land Allocation - $1,000,000)

 

18(Design & Contingencies - $1,950,000)

 

19(ii) Lancaster Headquarters, Lancaster County

 

20(A) Design and construct new headquarters
21facility

 

22Project Allocation

15,325,000

23(Base Project Allocation -
24$12,225,000)

 

25(Land Allocation - $1,000,000)

 

26(Design & Contingencies - $2,100,000)

 

<-27(12) State System of Higher Education

 

28(i) Bloomsburg University

 

29(A) Renovate and provide additional funds
30for McCormick Center

 

1Project Allocation

2,500,000

2(Base Project Allocation - $2,500,000)

 

3(ii) California University

 

4(A) Construct and provide additional
5funds for science building

 

6Project Allocation

45,000,000

7(Base Project Allocation -
8$45,000,000)

 

9(B) Renovate Morgan Hall

 

10Project Allocation

15,000,000

11(Base Project Allocation -
12$15,000,000)

 

13(iii) Edinboro University

 

14(A) Renovate B.F. Library, including
15addition

 

16Project Allocation

30,000,000

17(Base Project Allocation -
18$30,000,000)

 

19(iv) Indiana University

 

20(A) Demolish Foster Hall

 

21Project Allocation

3,000,000

22(Base Project Allocation - $3,000,000)

 

23(v) Lock Haven University

 

24(A) Renovate Robinson Learning Center

 

25Project Allocation

20,000,000

26(Base Project Allocation -
27$20,000,000)

 

28(B) Renovate Stevenson Library

 

29Project Allocation

25,000,000

30(Base Project Allocation -

 

1$25,000,000)

 

2(vi) Millersville University

 

3(A) Construct new academic building

 

4Project Allocation

25,000,000

5(Base Project Allocation -
6$25,000,000)

 

7(vii) Shippensburg University

 

8(A) Renovate and provide additional funds
9for Franklin Science Center

 

10Project Allocation

35,000,000

11(Base Project Allocation -
12$35,000,000)

 

13(viii) Slippery Rock University

 

14(A) Renovate and provide additional funds
15for Student Success Center

 

16Project Allocation

3,000,000

17(Base Project Allocation - $3,000,000)

 

18(B) Construct Industrial Safety
19Laboratory Building

 

20Project Allocation

15,000,000

21(Base Project Allocation -
22$15,000,000)

 

23(ix) West Chester University

 

24(A) Renovate and provide additional funds
25for Lawrence Hall

 

26Project Allocation

20,000,000

27(Base Project Allocation -
28$20,000,000)

 

29(B) Construct and provide additional
30funds for South Campus Athletics

 

1Facility

 

2Project Allocation

15,000,000

3(Base Project Allocation -
4$15,000,000)

 

5Section 4. Itemization of furniture and equipment projects.

6Additional capital projects in the category of public
7improvement projects consisting of the acquisition of movable
8furniture and equipment to complete public improvement projects
9and to be purchased by the Department of General Services, its
10successors or assigns, and to be financed by the incurring of
11debt are hereby itemized, together with their estimated
12financial cost, as follows:

13 

14Project

Total Project

Allocation

15(1) Department of Education

 

16(i) University of Pittsburgh

 

17(A) Provide original furniture and
18equipment to deferred maintenance
19Phase VIII

 

20Project Allocation

1,600,000

21(Base Project Allocation - $1,600,000)

 

<-22(2) State System of Higher Education

 

23(i) Edinboro University

 

24(A) Provide original furniture and
25equipment for B.F. Library addition
26and renovation

 

27Project Allocation

2,000,000

28(Base Project Allocation - $2,000,000)

 

29(ii) Kutztown University

 

30(A) Provide original furniture and

 

1equipment for DeFrancesco Education
2Building renovation

 

3Project Allocation

1,000,000

4(Base Project Allocation - $1,000,000)

 

5(iii) Shippensburg University

 

6(A) Provide original furniture and
7equipment for Franklin Science Center
8renovation

 

9Project Allocation

9,000,000

10(Base Project Allocation - $9,000,000)

 

11(iv) Slippery Rock University

 

12(A) Provide original furniture and
13equipment for Industrial Safety
14Laboratory Building

 

15Project Allocation

2,000,000

16(Base Project Allocation - $2,000,000)

 

17(v) West Chester University

 

18(A) Provide original furniture and
19equipment for Sturzebecker Health
20Science Center addition

 

21Project Allocation

4,000,000

22(Base Project Allocation - $4,000,000)

 

23Section 5. Itemization of transportation assistance projects.

24(a) Mass transit.--Additional capital projects in the
25category of transportation assistance projects for mass transit
26in which an interest is to be acquired or constructed by the
27Department of Transportation, its successors or assigns, and to
28be financed by the incurring of debt are hereby itemized,
29together with their estimated financial costs, as follows:

30 

 

1Project

Total Project




Allocation

2(1) Beaver County Transportation Authority

 

3(A) Construct CNG fueling station and
4renovate maintenance facility

 

5Project Allocation

574,000

6(Base Project Allocation - $517,000)

 

7(Design & Contingencies - $57,000)

 

8(2) Berks Area Reading Transportation Authority

 

9(A) Replace buses that have exceeded
10their useful life

 

11Project Allocation

850,000

12(Base Project Allocation - $850,000)

 

13(3) Butler Transit Authority

 

14(A) Provide funding for purchase of new
15or used buses

 

16Project Allocation

779,000

17(Base Project Allocation - $779,000)

 

18(4) Cambria County Transit Authority

 

19(A) Rehabilitate facilities and other
20miscellaneous improvements

 

21Project Allocation

581,000

22(Base Project Allocation - $523,000)

 

23(Design & Contingencies - $58,000)

 

24(5) Centre Area Transportation Authority

 

25(A) Replace buses that have exceeded
26their useful life

 

27Project Allocation

1,379,000

28(Base Project Allocation - $1,379,000)

 

29(6) County of Lackawanna Transit System

 

30(A) Replace buses that have exceeded

 

1their useful life

 

2Project Allocation

726,000

3(Base Project Allocation - $726,000)

 

4(7) Hazleton Public Transit

 

5(A) Replace buses that have exceeded
6their useful life

 

7Project Allocation

87,000

8(Base Project Allocation - $87,000)

 

9(8) Leigh <-Lehigh and Northampton Transportation
10Authority

 

11(A) Acquisition and other related costs
12for the purchase of transit buses

 

13Project Allocation

698,000

14(Base Project Allocation - $698,000)

 

15(B) Acquisition and other related costs
16for the purchase of minibuses

 

17Project Allocation

281,000

18(Base Project Allocation - $281,000)

 

<-19(9) Lycoming County

 

20(A) Purchase compressed natural gas
21vehicles

 

22Project Allocation

3,500,000

23(Base Project Allocation - $3,500,000)

 

24(9) <-(10) Mid Mon Valley

 

25(A) Replace buses that have exceeded
26their useful life

 

27Project Allocation

395,000

28(Base Project Allocation - $395,000)

 

29(10) <-(11) Monroe County Transit Authority

 

30(A) Design and construct park and ride

 

1lot for MCTA customers

 

2Project Allocation

387,000

3(Base Project Allocation - $348,000)

 

4(Design & Contingencies - $39,000)

 

5(B) Construct new maintenance facility
6building

 

7Project Allocation

581,000

8(Base Project Allocation - $523,000)

 

9(Design & Contingencies - $58,000)

 

10(11) <-(12) Port Authority of Allegheny County

 

11(A) Expand bus system, including
12construction, technology updates and
13vehicle acquisition for Bus Rapid
14Transit Program

 

15Project Allocation

49,582,000

16(Base Project Allocation -
17$44,624,000)

 

18(Design & Contingencies - $4,958,000)

 

19(B) Replace major components of bus and
20fixed guideway system as part of
21Section 5307 Program

 

22Project Allocation

4,723,000

23(Base Project Allocation - $4,251,000)

 

24(Design & Contingencies - $472,000)

 

25(C) Replace buses and rehabilitate
26various facilities and infrastructure
27as part of Bus and Bus Facilities
28Program

 

29Project Allocation

697,000

30(Base Project Allocation - $627,000)

 

1(Design & Contingencies - $70,000)

 

2(D) Rehabilitate or replace existing
3facilities and infrastructure as part
4of Federal grant program

 

5Project Allocation

6,484,000

6(Base Project Allocation - $5,836,000)

 

7(Design & Contingencies - $648,000)

 

8(E) Purchase 70 replacement buses as part
9of Section 5307 Flex Funds Program

 

10Project Allocation

1,836,000

11(Base Project Allocation - $1,652,000)

 

12(Design & Contingencies - $184,000)

 

13(F) Provide for capital improvements to
14stations, signals, track and buildings
15as part of Infrastructure Safety
16Renewal Program

 

17Project Allocation

14,516,000

18(Base Project Allocation -
19$13,064,000)

 

20(Design & Contingencies - $1,452,000)

 

21(G) Provide for overhaul of rolling stock
22as part of Vehicle Overhaul Program

 

23Project Allocation

3,387,000

24(Base Project Allocation - $3,048,000)

 

25(Design & Contingencies - $339,000)

 

<-26(H) Construction, infrastructure,
27redevelopment and other related costs
28for East Busway extension

 

29Project Allocation

3,867,000

30(Base Project Allocation - $3,867,000)

 

1(12) <-(13) River Valley Transit

 

2(A) Expand River Transit Center to
3accommodate needs

 

4Project Allocation

968,000

5(Base Project Allocation - $871,000)

 

6(Design & Contingencies - $97,000)

 

7(B) Construct CNG fueling station and
8renovate the maintenance facility to
9accommodate CNG vehicles

 

10Project Allocation

731,000

11(Base Project Allocation - $658,000)

 

12(Design & Contingencies - $73,000)

 

13(C) Replace rolling stock that has met
14its useful life

 

15Project Allocation

484,000

16(Base Project Allocation - $484,000)

 

17(13) <-(14) Schuylkill Transportation System

 

18(A) Expand existing facility to
19accommodate current and future needs

 

20Project Allocation

581,000

21(Base Project Allocation - $523,000)

 

22(Design & Contingencies - $58,000)

 

23(14) <-(15) Southeastern Pennsylvania
24Transportation Authority

 

25(A) Replace buses and rehabilitate
26various facilities as part of
27Urbanized Area Formula Program

 

28Project Allocation

47,613,000

29(Base Project Allocation -
30$42,852,000)

 

1(Design & Contingencies - $4,761,000)

 

2(B) Rehabilitate or replace various
3facilities and infrastructure as part
4of State of Good Repair Program

 

5Project Allocation

51,097,000

6(Base Project Allocation -
7$45,987,000)

 

8(Design & Contingencies - $5,110,000)

 

9(C) Replace buses and rehabilitate
10various facilities and infrastructure
11as part of Bus and Bus Facilities
12Program

 

13Project Allocation

3,484,000

14(Base Project Allocation - $3,136,000)

 

15(Design & Contingencies - $348,000)

 

16(D) Repair or rehabilitate various
17facilities and infrastructure as part
18of Bus Purchase Flex Program

 

19Project Allocation

8,266,000

20(Base Project Allocation - $7,439,000)

 

21(Design & Contingencies - $827,000)

 

22(E) Rehabilitate or replace existing
23facilities and infrastructure as part
24of Federal grant program

 

25Project Allocation

5,807,000

26(Base Project Allocation - $5,226,000)

 

27(Design & Contingencies - $581,000)

 

28(F) Restore transit and railroad
29infrastructure, including maintenance
30support facilities, as part of

 

1Infrastructure Safety Renewal Program

 

2Project Allocation

69,678,000

3(Base Project Allocation -
4$62,710,000)

 

5(Design & Contingencies - $6,968,000)

 

6(G) Rehabilitate or replace various
7facilities and infrastructure as part
8of State of Good Repair Program

 

9Project Allocation

19,356,000

10(Base Project Allocation -
11$17,420,000)

 

12(Design & Contingencies - $1,936,000)

 

13(H) Replace existing assets as part of
14Vehicle Overhaul Program

 

15Project Allocation

55,162,000

16(Base Project Allocation -
17$49,646,000)

 

18(Design & Contingencies - $5,516,000)

 

19(15) <-(16) Westmoreland County Transportation
20Authority

 

21(A) Purchase property and construct park
22and ride lot for MCTA customers

 

23Project Allocation

581,000

24(Land Allocation - $145,000)

 

25(Design & Contingencies - $436,000)

 

26(16) <-(17) York Adams Transportation Authority

 

27(A) Replacement of rolling stock

 

28Project Allocation

892,000

29(Base Project Allocation - $892,000)

 

30(b) Rural and intercity rail.--Additional capital projects

1in the category of transportation assistance projects for rural
2and intercity rail service projects to be constructed or with
3respect to which an interest is to be acquired by the Department
4of Transportation, its successors or assigns and to be financed
5by the incurring of debt are hereby itemized, together with
6their respective estimated financial costs, as follows:

7 

8Project

Total Project

Allocation

9(1) Dauphin County

<-

10(1) Allegheny County

<-

11(i) City of Pittsburgh

 

12(A) Acquisition, construction,
13infrastructure, redevelopment,
14renovation, abatement of hazardous
15materials and other related costs for
16improvements to the rail line near
17Bakery Square

 

18Project Allocation

20,000,000

19(Base Project Allocation -
20$20,000,000)

 

21(ii) Dormont Borough

 

22(A) Construction, infrastructure,
23redevelopment and other related costs
24for improvements along the Port
25Authority's Light Rail Transit Line

 

26Project Allocation

12,000,000

27(Base Project Allocation -
28$12,000,000)

 

29(iii) Wimerding Borough

 

30(A) Acquisition, construction,

 

1infrastructure, redevelopment,
2renovation, abatement of hazardous
3materials and other related costs for
4improving a rail line along Allegheny
5Petroleum facility

 

6Project Allocation

20,000,000

7(Base Project Allocation -
8$20,000,000)

 

9(2) Beaver County

 

10(i) Ambridge Borough

 

11(A) Acquisition, construction,
12infrastructure, redevelopment,
13renovation, abatement of hazardous
14materials and other related costs for
15improving a rail line along Allegheny
16Petroleum facility

 

17Project Allocation

10,000,000

18(Base Project Allocation -
19$10,000,000)

 

20(3) Blair County

 

21(i) Everett Railroad Company

 

22(A) Rehabilitate rail infrastructure,
23including, engineering, project
24management, rail, ties, ballast and
25other related materials

 

26Project Allocation

1,500,000

27(Base Project Allocation - $1,500,000)

 

28(4) Bradford County

 

29(i) Wyalusing Borough

 

30(A) Construct a rail transload and

 

1material storage facility, including
2land acquisition, site preparation,
3engineering, permitting, rail, ties,
4ballast, storage tracks, switches,
5transload equipment, install truck
6scale and construct a
7loading/unloading area

 

8Project Allocation

1,800,000

9(Base Project Allocation - $1,800,000)

 

10(5) Chester County

 

11(i) Brandywine Valley Railroad

 

12(A) Repair bridges, rehabilitate rail
13infrastructure and improve freight
14yards, including engineering,
15drainage, rail, ties, ballast,
16switches and all rail-related
17materials necessary for project
18completion

 

19Project Allocation

2,500,000

20(Base Project Allocation - $2,500,000)

 

21(6) Clinton County

 

22(i) City of Lock Haven

 

23(A) Construction, renovation and other
24related costs to reconstruct a rail
25line including a new access road,
26sidings and facility improvements

 

27Project Allocation

1,540,000

28(Base Project Allocation - $1,540,000)

 

29(7) Dauphin County

 

30(i) Swatara Township

 

1(A) Acquisition, construction,
2redevelopment, renovation and related
3costs for Norfolk Southern Railroad
4upgrades and improvements to
5infrastructure within proximity to
6Rutherford Rail Yard

 

7Project Allocation

50,000,000

8(Base Project Allocation -
9$50,000,000)

 

<-10(8) Fayette County

 

11(i) County projects

 

12(A) Rehabilitate, reconfigure existing
13infrastructure and construct
14additional track for car storage and
15unloading materials in Fayette County,
16including engineering, site
17preparation, rail, ties, ballast and
18other rail-related materials

 

19Project Allocation

2,800,000

20(Base Project Allocation - $2,800,000)

 

21(2) <-(9) Lawrence County

 

22(i) Bessemer and Mahoning Boroughs <-Borough 
23and Mahoning Township<-

 

24(A) Construction, acquisition,
25infrastructure, redevelopment,
26abatement of hazardous materials,
27renovation, rehabilitation and other
28related costs for the installation of
29rail lines

 

30Project Allocation

10,000,000

1(Base Project Allocation -
2$10,000,000)

 

3(ii) Ellwood City Borough

 

4(A) Construction, infrastructure,
5renovation, rehabilitation and other
6related costs for a railroad underpass

 

7Project Allocation

500,000

8(Base Project Allocation - $500,000)

 

9(iii) City of New Castle

 

10(A) Construction, acquisition,
11infrastructure, redevelopment,
12abatement of hazardous materials,
13renovation, rehabilitation and other
14related costs for the installation of
15rail lines

 

16Project Allocation

5,000,000

17(Base Project Allocation - $5,000,000)

 

18(iv) Neshannock Township

 

19(A) Construction, acquisition,
20infrastructure and other related costs
21for the installation of rail lines at
22Millennium Technology Park

 

23Project Allocation

15,000,000

24(Base Project Allocation -
25$15,000,000)

 

26(v) New Beaver Borough

 

27(A) Construction, acquisition,
28infrastructure, redevelopment,
29abatement of hazardous materials,
30renovation, rehabilitation and other

 

1related costs for the installation of
2rail lines at New Beaver Commercial
3Park

 

4Project Allocation

3,000,000

5(Base Project Allocation - $3,000,000)

 

<-6(10) Luzerne County

 

7(i) County projects

 

8(A) Extend rail service to recycling
9facility and expand transload
10operation in Luzerne County, including
11land acquisition, site preparation,
12engineering, permitting, rail, ties,
13ballast, storage tracks, switches,
14transload equipment, paving and
15construct an enclosed storage area

 

16Project Allocation

1,000,000

17(Base Project Allocation - $1,000,000)

 

18(3) <-(11) Mercer County

 

19(i) City of Farrell

 

20(A) Construction, infrastructure,
21renovation, rehabilitation and other
22related costs for a car thawing system
23and related facilities

 

24Project Allocation

3,500,000

25(Base Project Allocation - $3,500,000)

 

26(ii) City of Sharon

 

27(A) Construction, infrastructure,
28renovation, rehabilitation and other
29related costs for rail facility

 

30Project Allocation

1,050,000

1(Base Project Allocation - $1,050,000)

 

2(iii) Sharpsville Borough

 

3(A) Construction, infrastructure and
4other related costs for transload
5railroad siding facility

 

6Project Allocation

7,000,000

7(Base Project Allocation - $7,000,000)

 

8(4) <-(12) Monroe County

 

9(i) East Stroudsburg Borough

 

10(A) Construction and related costs for
11replacement of a railroad bridge

 

12Project Allocation

1,200,000

13(Base Project Allocation - $1,200,000)

 

<-14(13) Montgomery County

 

15(i) Upper Merion and Plymouth Railroad

 

16(A) Construct new storage tracks,
17rehabilitate bridges and rail
18infrastructure and upgrade tracks
19within Plymouth Yard, including land
20acquisition, site preparation,
21engineering, permitting, drainage,
22rail, ties ballast, switches and all
23rail-related materials necessary for
24project completion

 

25Project Allocation

2,000,000

26(Base Project Allocation - $2,000,000)

 

27(14) Northumberland County

 

28(i) Boyd Station, LLC

 

29(A) Expand existing infrastructure to
30increase capacity in transloading and

 

1processing of agricultural commodities
2in Northumberland County, including
3site preparation, engineering,
4permitting, grading, rail ties,
5ballast, switches and construction of
6transloading equipment and additional
7storage units

 

8Project Allocation

4,000,000

9(Base Project Allocation - $4,000,000)

 

10(15) SEDA-COG Joint Rail Authority

 

11(i) Blair, Centre, Columbia and Lycoming
12Counties

 

13(A) Upgrade 22 railroad bridges in
14central Pennsylvania to ensure safe
15and efficient rail freight service

 

16Project Allocation

1,911,000

17(Base Project Allocation - $1,911,000)

 

18(ii) Columbia County

 

19(A) Reconstruct railroad roadbed and
20related track and construct and
21improve drainage facilities to protect
22railroad from flood damage

 

23Project Allocation

1,470,000

24(Base Project Allocation - $1,470,000)

 

25(iii) Lycoming County

 

26(A) Purchase industrial property in
27Clinton Township, Lycoming County and
28rehabilitate and construct yard track
29and related facilities

 

30Project Allocation

1,750,000

1(Base Project Allocation - $1,750,000)

 

2(iv) Mifflin County

 

3(A) Rehabilitate and construct yard
4tracks and related site development in
5North Yards

 

6Project Allocation

1,750,000

7(Base Project Allocation - $1,750,000)

 

8(B) Reconstruct railroad roadbed and
9track and improve subgrade and
10drainage on Mifflin County Industrial
11Park rail spur

 

12Project Allocation

1,050,000

13(Base Project Allocation - $1,050,000)

 

14(16) York County

 

15(i) City of York

 

16(A) Acquisition, construction,
17infrastructure, redevelopment,
18renovation and other related costs for
19Continental Square renovation project

 

20Project Allocation

3,500,000

21(Base Project Allocation - $3,500,000)

 

22(17) Multiple Counties

 

23(i) Blair, Centre, Clinton, Columbia,
24Lycoming, Montour, Mifflin and
25Northumberland Counties

 

26(A) Construction, renovation and other
27related costs to upgrade and construct
28twenty-two railroad bridges on short
29line railroads

 

30Project Allocation

1,900,000

1(Base Project Allocation - $1,900,000)

 

2(ii) Clinton, Columbia, Lycoming and Montour
3Counties

 

4(A) Construction, renovation and other
5related costs to construct, expand and
6rehabilitate railroad tracks and
7sidings

 

8Project Allocation

2,340,000

9(Base Project Allocation - $2,340,000)

 

10(c) Air transportation.--Additional capital projects in the
11category of transportation assistance projects for air
12transportation service to which an interest is to be acquired by
13the Department of Transportation, its successors or assigns and
14to be financed by the incurring of debt are hereby itemized,
15together with their respective estimated financial costs, as
16follows:

17 

18Project

Total Project

Allocation

19(1) Adams County

 

20(i) Cumberland Township

 

21(A) Rehabilitation of existing aviation
22facilities and construction of new
23hangars, taxiways and airport related
24buildings at Gettysburg Regional
25Airport

 

26Project Allocation

700,000

27(Base Project Allocation - $700,000)

 

28(2) Dauphin County

 

29(i) Susquehanna Area Regional Airport
30Authority

 

1(A) Rehabilitation of existing aviation
2facilities and construction,
3infrastructure and related costs of
4new hangars, taxiways and airport
5related buildings at Harrisburg
6International Airport

 

7Project Allocation

1,000,000

8(Base Project Allocation - $1,000,000)

 

<-9(3) Franklin County

 

10(i) Susquehanna Area Regional Airport
11Authority

 

12(A) Rehabilitation of existing aviation
13facilities and construction of new
14hangars, taxiways and airport related
15buildings at Franklin County Regional
16Airport in Greene Township

 

17Project Allocation

700,000

18(Base Project Allocation - $700,000)

 

19(3) <-(4) York County

 

20(i) Susquehanna Area Regional Airport
21Authority

 

22(A) Rehabilitation of existing aviation
23facilities and construction of new
24hangars, taxiways and airport related
25buildings at Capital City Airport

 

26Project Allocation

700,000

27(Base Project Allocation - $700,000)

 

28Section 6. Itemization of redevelopment assistance projects.

29(a) Additional capital projects in the category of
30redevelopment assistance projects for capital grants by the

1Department of Community and Economic Development, its successors
2or assigns, authorized under the provisions of the act of May
320, 1949 (P.L.1633, No.493), known as the Housing and
4Redevelopment Assistance Law, and redevelopment assistance
5capital projects and to be financed by the incurring of debt,
6are hereby itemized, together with their estimated financial
7costs, as follows:

8 

9Project

Total Project

Allocation

10(1) Adams County

 

11(i) County projects (Reserved)

<-

12(A) Infrastructure, construction,<-
13equipment and other related costs to
14Knouse Foods, Incorporated for
15economic development

 

16Project Allocation

4,000,000

17(Base Project Allocation - $4,000,000)

 

18(ii) Cumberland Township

 

19(A) Construction, infrastructure,
20acquisition and related costs for an
21economic development project at
22Gettysburg Regional Airport

 

23Project Allocation

5,000,000

24(Base Project Allocation - $5,000,000)

 

25(2) Allegheny County

 

26(i) County projects (Reserved)

<-

27(A) Construction, infrastructure,<-
28redevelopment, renovation and other
29related costs for the Sewickley Campus
30Intermediate Care Facility in

 

1Sewickley Township and Ohio Borough

 

2Project Allocation

1,000,000

3(Base Project Allocation - $1,000,000)

 

4(ii) City of Pittsburgh

 

5(A) Construction, infrastructure,
6renovation and other related costs for
7the Allegheny County Courthouse

 

8Project Allocation

20,000,000

9(Base Project Allocation -
10$20,000,000)

 

11(B) Construction, infrastructure,
12renovation, rehabilitation and other
13related costs for the City-County
14Building

 

15Project Allocation

2,600,000

16(Base Project Allocation - $2,600,000)

 

17(C) Construction, acquisition,
18infrastructure and other related costs
19for a renovation project at Duquesne
20University

 

21Project Allocation

20,000,000

22(Base Project Allocation -
23$20,000,000)

 

24(D) Construction, acquisition,
25infrastructure and other related costs
26for an educational complex

 

27Project Allocation

5,500,000

28(Base Project Allocation - $5,500,000)

 

29(E) Construction, infrastructure,
30renovation, rehabilitation and other

 

1related costs for the John P. Robin
2Civic Building

 

3Project Allocation

1,000,000

4(Base Project Allocation - $1,000,000)

 

5(F) Construction, infrastructure,
6renovation, rehabilitation and other
7related costs for the Municipal Courts
8Building

 

9Project Allocation

1,000,000

10(Base Project Allocation - $1,000,000)

 

11(G) Construction, infrastructure,
12redevelopment and other related costs
13for a parking facility on the North
14Side of Pittsburgh

 

15Project Allocation

7,000,000

16(Base Project Allocation - $7,000,000)

 

17(H) Construction, acquisition,
18infrastructure, renovation,
19rehabilitation and other related costs
20for a public safety training facility

 

21Project Allocation

2,500,000

22(Base Project Allocation - $2,500,000)

 

23(I) Construction, redevelopment,
24renovation, rehabilitation and other
25related costs for the Union Trust
26Building project

 

27Project Allocation

10,000,000

28(Base Project Allocation -
29$10,000,000)

 

<-30(J) Acquisition, construction,

 

1infrastructure, redevelopment,
2renovation, abatement of hazardous
3materials and other related costs for
4development of the Provident Charter
5School

 

6Project Allocation

2,000,000

7(Base Project Allocation - $2,000,000)

 

8(K) Acquisition, construction,
9infrastructure, redevelopment,
10renovation, abatement of hazardous
11materials and other related costs for
12expansion of Bakery Square, including
13construction and improvements to the
14rail line

 

15Project Allocation

20,000,000

16(Base Project Allocation -
17$20,000,000)

 

18(L) Acquisition, construction,
19infrastructure, redevelopment,
20renovation, abatement of hazardous
21materials and other related costs for
22an economic development project

 

23Project Allocation

15,000,000

24(Base Project Allocation -
25$15,000,000)

 

26(iii) Green Tree Borough

 

27(A) Construction, infrastructure,
28renovation and other related costs for
29sidewalk improvement project

 

30Project Allocation

1,000,000

1(Base Project Allocation - $1,000,000)

 

2(iii) <-(iv) Monroeville Borough

 

3(A) Acquisition, infrastructure,
4renovation and other related costs for
5Pittsburgh Supercomputing Center

 

6Project Allocation

550,000

7(Base Project Allocation - $550,000)

 

8(iv) <-(v) O'Hara Township

 

9(A) Construction, infrastructure and
10related costs for a community center
11building

 

12Project Allocation

1,000,000

13(Base Project Allocation - $1,000,000)

 

<-14(vi) Sewickley Borough

 

15(A) Construction, land acquisition,
16infrastructure and other costs related
17to an office building and parking
18garage

 

19Project Allocation

3,000,000

20(Base Project Allocation - $3,000,000)

 

21(vii) Wimerding Borough

 

22(A) Acquisition, construction,
23infrastructure, redevelopment,
24renovation, abatement of hazardous
25materials and other related costs for
26expansion of the Allegheny Petroleum
27headquarters, including improving a
28rail line

 

29Project Allocation

20,000,000

30(Base Project Allocation -

 

1$20,000,000)

 

2(3) Armstrong County (Reserved)

 

3(4) Beaver County

 

4(i) County projects

 

5(A) Acquisition, construction,
6renovation, infrastructure,
7redevelopment, abatement of hazardous
8materials and other related costs for
9Ambridge Harmony Redevelopment Project

 

10Project Allocation

6,000,000

11(Base Project Allocation - $6,000,000)

 

12(B) Acquisition, construction,
13renovation, infrastructure,
14redevelopment, abatement of hazardous
15materials and other related costs for
16industrial site improvements and
17cleanup in Koppel Borough and Big
18Beaver Borough

 

19Project Allocation

5,000,000

20(Base Project Allocation - $5,000,000)

 

21(C) Acquisition, construction,
22renovation, infrastructure,
23redevelopment, abatement of hazardous
24materials and other related costs for
25blight removal

 

26Project Allocation

7,500,000

27(Base Project Allocation - $7,500,000)

 

28(ii) City of Beaver Falls

 

29(A) Construction, acquisition,
30infrastructure, abatement of hazardous

 

1materials, renovation, rehabilitation
2and other related costs of a community
3center and public plaza

 

4Project Allocation

5,000,000

5(Base Project Allocation - $5,000,000)

 

6(B) Construction, acquisition,
7infrastructure, redevelopment,
8abatement of hazardous materials,
9renovation, rehabilitation and other
10related costs for a mixed use building
11project

 

12Project Allocation

2,500,000

13(Base Project Allocation - $2,500,000)

 

14(C) Construction, acquisition,
15infrastructure, redevelopment,
16renovation, rehabilitation, site
17development and other related costs of
18the revitalization of the business
19district of Beaver Falls

 

20Project Allocation

5,000,000

21(Base Project Allocation - $5,000,000)

 

22(D) Construction, acquisition,
23infrastructure, redevelopment,
24renovation, rehabilitation, site
25development and other related costs of
26the master plan for the Beaver Falls
27park systems

 

28Project Allocation

500,000

29(Base Project Allocation - $500,000)

 

30(E) Construction, acquisition,

 

1infrastructure, redevelopment,
2renovation, rehabilitation, site
3development and other related costs of
4the Beaver Falls Riverfront
5Development

 

6Project Allocation

5,000,000

7(Base Project Allocation - $5,000,000)

 

<-8(ii.1) Ambridge Borough

 

9(A) Acquisition, construction,
10infrastructure, redevelopment,
11renovation, abatement of hazardous
12materials and other related costs for
13expansion of the Allegheny Petroleum
14facility, including improving a rail
15line

 

16Project Allocation

10,000,000

17(Base Project Allocation -
18$10,000,000)

 

19(iii) Baden Borough

 

20(A) Acquisition, construction,
21renovation, infrastructure,
22redevelopment, abatement of hazardous
23materials and other related costs for
24Baden Development Project

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(iv) Center Township

 

28(A) Acquisition, construction,
29renovation, infrastructure,
30redevelopment and other related costs

 

1for Center Township development areas

 

2Project Allocation

10,000,000

3(Base Project Allocation -
4$10,000,000)

 

5(v) Hopewell Township

 

6(A) Acquisition, construction,
7renovation, infrastructure,
8redevelopment and other related costs
9for Hopewell Development Area

 

10Project Allocation

10,000,000

11(Base Project Allocation -
12$10,000,000)

 

13(vi) Midland Borough

 

14(A) Acquisition, construction,
15renovation, infrastructure,
16redevelopment, abatement of hazardous
17materials and other related costs for
18industrial site improvements and
19cleanup

 

20Project Allocation

5,000,000

21(Base Project Allocation - $5,000,000)

 

22(vii) Monaca Borough

 

23(A) Acquisition, construction,
24renovation, infrastructure,
25redevelopment, abatement of hazardous
26materials and other related costs for
27industrial site improvements and
28cleanup

 

29Project Allocation

10,000,000

30(Base Project Allocation -

 

1$10,000,000)

 

2(viii) New <-North Sewickley Township

 

3(A) Acquisition, construction,
4renovation, infrastructure,
5redevelopment, abatement of hazardous
6materials and other related costs for
7New Sewickley Development Project

 

8Project Allocation

5,000,000

9(Base Project Allocation - $5,000,000)

 

10(B) Construction, acquisition,
11infrastructure and other related costs
12for a hotel project

 

13Project Allocation

5,000,000

14(Base Project Allocation - $5,000,000)

 

15(ix) Potter Township

 

16(A) Acquisition, construction,
17renovation, infrastructure,
18redevelopment, abatement of hazardous
19materials and other related costs for
20industrial site improvements and
21cleanup

 

22Project Allocation

5,000,000

23(Base Project Allocation - $5,000,000)

 

24(x) Rochester Borough

 

25(A) Acquisition, construction,
26renovation, infrastructure, abatement
27of hazardous materials and other
28related costs for Rochester Area
29riverfront

 

30Project Allocation

3,000,000

1(Base Project Allocation - $3,000,000)

 

2(5) Bedford County (Reserved)

 

3(6) Berks County

 

4(i) County projects (Reserved)

 

<-5(ii) City of Reading

 

6(A) Construction, infrastructure,
7redevelopment, renovation, abatement
8of hazardous materials and other
9related costs for redevelopment at 35
10North 6th Street

 

11Project Allocation

5,500,000

12(Base Project Allocation - $5,500,000)

 

13(B) Construction, infrastructure,
14redevelopment, renovation, abatement
15of hazardous materials and other
16related costs for the expansion of a
17parking garage

 

18Project Allocation

3,400,000

19(Base Project Allocation - $3,400,000)

 

20(iii) West Reading Borough

 

21(A) Acquisition, construction,
22infrastructure, redevelopment,
23demolition and other related costs for
24a public parking facility

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(ii) <-(iv) Wyomissing Borough

 

28(A) Acquisition, construction,
29demolition, infrastructure
30improvements and revitalization of a

 

1development site

 

2Project Allocation

12,000,000

3(Base Project Allocation -
4$12,000,000)

 

5(7) Blair County (Reserved)

 

6(8) Bradford County

 

7(i) County projects (Reserved)

 

8(ii) Towanda Borough

 

9(A) Construction, infrastructure and
10related costs of a cogeneration
11project for Global Tungsten and
12Powders Corporation

 

13Project Allocation

5,000,000

14(Base Project Allocation - $5,000,000)

 

<-15(iii) Wyalusing Borough

 

16(A) Construction, infrastructure and
17related costs to provide natural gas
18distribution to Wyalusing Borough

 

19Project Allocation

1,000,000

20(Base Project Allocation - $1,000,000)

 

21(9) Bucks County

 

22(i) County projects

 

23(A) Construction, infrastructure and
24related costs for a First Tee indoor
25instructional facility

 

26Project Allocation

500,000

27(Base Project Allocation - $500,000)

 

28(ii) Bensalem Township

 

29(A) Construction, infrastructure,
30renovation and related costs for the

 

1conversion of a building into a
2community sports and recreation
3facility and a community theater

 

4Project Allocation

2,000,000

5(Base Project Allocation - $2,000,000)

 

<-6(iii) Buckingham Township

 

7(A) Construction, infrastructure and
8related costs for the renovation and
9expansion of the Bucks County
10Biotechnology Center

 

11Project Allocation

4,500,000

12(Base Project Allocation - $4,500,000)

 

13(iv) Doylestown Township

 

14(A) Construction, infrastructure and
15related costs for renovation and
16expansion of the Richard A. Reif Heart
17Institute at Doylestown Hospital

 

18Project Allocation

2,500,000

19(Base Project Allocation - $2,500,000)

 

20(v) Lower Makefield Township

 

21(A) Construction, infrastructure and
22other related costs for a pedestrian
23overpass

 

24Project Allocation

1,250,000

25(Base Project Allocation - $1,250,000)

 

26(B) Construction, infrastructure and
27other related costs for a community
28center

 

29Project Allocation

1,000,000

30(Base Project Allocation - $1,000,000)

 

1(vi) Morrisville Borough

 

2(A) Construction, infrastructure,
3redevelopment, renovation and other
4related costs for improvements to
5facilities at Williamson Park

 

6Project Allocation

1,000,000

7(Base Project Allocation - $1,000,000)

 

8(iii) <-(vii) New Hope Borough

 

9(A) Construction, infrastructure and
10related costs for the redevelopment of
11the former Odette's site

 

12Project Allocation

10,000,000

13(Base Project Allocation -
14$10,000,000)

 

<-15(viii) Newtown Township

 

16(A) Construction, infrastructure and
17other related costs for a community
18center

 

19Project Allocation

2,000,000

20(Base Project Allocation - $2,000,000)

 

21(iv) Northampton township <-(ix) Northampton
22Township<-

 

23(A) Construction, infrastructure and
24related costs for a police station

 

25Project Allocation

2,500,000

26(Base Project Allocation - $2,500,000)

 

<-27(x) Yardley Borough

 

28(A) Renovation and other related costs
29for the Brock Creek Embankment Repair
30Project

 

1Project Allocation

200,000

2(Base Project Allocation - $200,000)

 

3(B) Construction, renovation and other
4related costs for the Brock Creek
5Discharge Project

 

6Project Allocation

25,000

7(Base Project Allocation - $25,000)

 

8(10) Butler County (Reserved)

 

9(11) Cambria County (Reserved)

 

10(12) Cameron County (Reserved)

 

11(13) Carbon County (Reserved)

 

12(14) Centre County (Reserved)

 

13(15) Chester County

 

14(i) County projects (Reserved)

 

15(ii) City of Coatesville

 

16(A) Construction, infrastructure and
17related costs for the renovation of
18the Graystone Mansion

 

19Project Allocation

500,000

20(Base Project Allocation - $500,000)

 

<-21(B) Construction, redevelopment and
22related costs to the expansion and
23renovation of the New Tripoli fire
24station

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(C) Construction, infrastructure and
28related costs for a commercial office
29building

 

30Project Allocation

5,000,000

1(Base Project Allocation - $5,000,000)

 

2(iii) Willistown Township

 

3(A) Construction, acquisition and related
4costs for two addiction rehabilitation
5and counseling residential facilities
6and offices

 

7Project Allocation

8,500,000

8(Base Project Allocation - $8,500,000)

 

9(16) Clarion County (Reserved)

 

10(17) Clearfield County (Reserved)

 

11(18) Clinton County (Reserved)

 

12(19) Columbia County (Reserved)

<-

13(i) County projects (Reserved)

<-

14(ii) Briar Creek Borough

 

15(A) For costs associated with the
16renovation of a community pool and
17park

 

18Project Allocation

500,000

19(Base Project Allocation - $500,000)

 

20(20) Crawford County (Reserved)

 

21(21) Cumberland County

 

22(i) County projects

 

23(A) Land acquisition, infrastructure
24improvements, demolition, site
25improvement, renovation, addition,
26utility expansion, construction,
27purchase of medically necessary
28fixtures and other related costs for
29facilities of the Holy Spirit Health
30System

 

1Project Allocation

10,000,000

2(Base Project Allocation -
3$10,000,000)

 

4(ii) East Pennsboro Township

 

5(A) Construction, infrastructure,
6redevelopment and related costs for
7the Summerdale mixed-use development
8project, Cumberland County Industrial
9Development Authority

 

10Project Allocation

15,000,000

11(Base Project Allocation -
12$15,000,000)

 

<-13(iii) South Middleton Township

 

14(A) Acquisition, construction,
15infrastructure, redevelopment,
16renovation and related costs for a
17planned development consisting of a
18mix of residential units, retail and
19light industrial uses

 

20Project Allocation

3,000,000

21(Base Project Allocation - $3,000,000)

 

22(22) Dauphin County

 

23(i) County projects

 

24(A) Land acquisition, infrastructure
25improvements, demolition, site
26improvement, renovation, addition,
27utility expansion, construction,
28purchase of medically necessary
29fixtures and other related costs for
30facilities of the Holy Spirit Health

 

1System

 

2Project Allocation

10,000,000

3(Base Project Allocation -
4$10,000,000)

 

<-5(B) Acquisition, construction,
6redevelopment and related costs for a
7public park

 

8Project Allocation

500,000

9(Base Project Allocation - $500,000)

 

10(ii) City of Harrisburg

 

11(A) Construction, infrastructure,
12redevelopment, renovation,
13rehabilitation and other related costs
14for a soccer and multipurpose sports
15and recreation complex at City Island

 

16Project Allocation

7,000,000

17(Base Project Allocation - $7,000,000)

 

18(B) Construction, acquisition,
19infrastructure, redevelopment,
20renovation, rehabilitation and other
21related costs of a senior residential
22and care center

 

23Project Allocation

10,000,000

24(Base Project Allocation -
25$10,000,000)

 

26(C) Construction, acquisition,
27infrastructure, redevelopment,
28renovation, rehabilitation and other
29related costs for blight elimination
30in the City of Harrisburg downtown

 

1business district

 

2Project Allocation

5,000,000

3(Base Project Allocation - $5,000,000)

 

4(D) Construction, infrastructure,
5redevelopment, renovation,
6rehabilitation and other related costs
7for the Strawberry Square Complex

 

8Project Allocation

1,000,000

9(Base Project Allocation - $1,000,000)

 

<-10(E) Construction, infrastructure,
11renovation and related costs for
12necessary improvements to Harrisburg
13University

 

14Project Allocation

1,600,000

15(Base Project Allocation - $1,600,000)

 

16(iii) Hummelstown Borough

 

17(A) Construction, infrastructure,
18redevelopment, renovation and related
19costs for pedestrian safety and
20streetscape improvements

 

21Project Allocation

5,000,000

22(Base Project Allocation - $5,000,000)

 

23(iv) Middletown Borough

 

24(A) Construction, infrastructure,
25redevelopment, renovation and related
26costs for pedestrian safety
27improvements and restoration,
28revitalization of historical buildings
29in Middletown Borough Industrial and
30Commercial Development Authority

 

1Project Allocation

15,000,000

2(Base Project Allocation -
3$15,000,000)

 

4(v) Derry Township Industrial and Commercial
5Development Authority

 

6(A) Acquisition, construction,
7infrastructure, redevelopment,
8renovation and related costs for an
9urban downtown revitalization project

 

10Project Allocation

30,000,000

11(Base Project Allocation -
12$30,000,000)

 

13(B) Construction, infrastructure,
14redevelopment, renovation and related
15costs to bring a historical facility
16up to current building codes and ADA
17requirements

 

18Project Allocation

10,000,000

19(Base Project Allocation -
20$10,000,000)

 

21(C) Construction, infrastructure,
22redevelopment, renovation and related
23costs for upgrades to existing
24township recreational site, including
25ADA upgrades to existing buildings and
26facilities and improvements to
27existing sports fields

 

28Project Allocation

5,000,000

29(Base Project Allocation - $5,000,000)

 

30(D) Acquisition, construction,

 

1infrastructure and related costs for a
2regional economic development project

 

3Project Allocation

50,000,000

4(Base Project Allocation -
5$50,000,000)

 

6(E) Construction, infrastructure,
7redevelopment, renovation and related
8costs for pedestrian safety, public
9improvements, campus security upgrades
10and flood control improvements at Penn
11State Hershey Medical Center

 

12Project Allocation

25,000,000

13(Base Project Allocation -
14$25,000,000)

 

15(vi) Lower Swatara Township

 

16(A) Acquisition, construction,
17infrastructure and related costs for
18an economic development project at
19Harrisburg International Airport

 

20Project Allocation

5,000,000

21(Base Project Allocation - $5,000,000)

 

22(B) Construction, acquisition,
23redevelopment, renovation and related
24costs for student pedestrian safety,
25infrastructure improvements, campus
26security upgrades and flood control
27improvements at Pennsylvania State
28University Harrisburg Campus

 

29Project Allocation

20,000,000

30(Base Project Allocation -

 

1$20,000,000)

 

2(vii) Swatara Township

 

3(A) Acquisition, construction,
4redevelopment, renovation and related
5costs for Norfolk Southern Railroad
6upgrades and improvements to
7infrastructure within proximity to
8Rutherford Rail Yard

 

9Project Allocation

50,000,000

10(Base Project Allocation -
11$50,000,000)

 

12(23) Delaware County

 

13(i) County projects

 

14(A) Construction, infrastructure,
15redevelopment and related costs for
16infrastructure improvements,
17rehabilitation, renovation and other
18capital projects

 

19Project Allocation

20,000,000

20(Base Project Allocation -
21$20,000,000)

 

<-22(B) Acquisition, construction,
23infrastructure and related costs for
24the establishment of an economic
25development incubator, Delaware County
26Redevelopment Authority

 

27Project Allocation

4,000,000

28(Base Project Allocation - $4,000,000)

 

29(C) Acquisition, construction,
30infrastructure and related costs for

 

1an economic development project,
2Delaware County Redevelopment
3Authority

 

4Project Allocation

10,000,000

5(Base Project Allocation -
6$10,000,000)

 

7(D) Neumann University campus and
8community improvements

 

9Project Allocation

2,750,000

10(Base Project Allocation - $2,750,000)

 

11(ii) Chester Heights Borough

 

12(A) Construction, infrastructure and
13related costs for the expansion of
14Wawa, Incorporated's Red Roof facility

 

15Project Allocation

10,000,000

16(Base Project Allocation -
17$10,000,000)

 

18(B) Construction, infrastructure,
19redevelopment and related costs for
20renovation and expansion of an
21existing building that serves as the
22fire station and borough hall

 

23Project Allocation

500,000

24(Base Project Allocation - $500,000)

 

25(ii) <-(iii) Darby Borough

 

26(A) Construction, renovation,
27infrastructure, redevelopment and
28other related costs for Darby Free
29Library

 

30Project Allocation

500,000

1(Base Project Allocation - $500,000)

 

<-2(B) Construction, infrastructure,
3renovation, redevelopment and other
4related costs for upgrades for Darby
5Library Company

 

6Project Allocation

500,000

7(Base Project Allocation - $500,000)

 

8(iv) Marple Township

 

9(A) Construction, infrastructure and
10related costs for a new municipal
11police station and magisterial
12district court

 

13Project Allocation

4,100,000

14(Base Project Allocation - $4,100,000)

 

15(B) Construction, infrastructure and
16related costs for expansion and
17renovations to the Marple Township
18municipal complex and Marple Public
19Library

 

20Project Allocation

654,000

21(Base Project Allocation - $654,000)

 

22(v) Morton Borough

 

23(A) Renovation and related costs for
24Morton Borough Municipal Complex

 

25Project Allocation

500,000

26(Base Project Allocation - $500,000)

 

27(vi) Newtown Township

 

28(A) Construction, infrastructure,
29redevelopment, renovation, site
30preparation and related costs to

 

1expand existing Melmark plant

 

2Project Allocation

10,000,000

3(Base Project Allocation -
4$10,000,000)

 

5(vii) Radnor Township

 

6(A) Construction, infrastructure and
7related costs for updates and
8improvements to a township park

 

9Project Allocation

900,000

10(Base Project Allocation - $900,000)

 

11(B) Renovation, construction and related
12costs for the expansion of the
13Memorial Library of Radnor Township

 

14Project Allocation

3,900,000

15(Base Project Allocation - $3,900,000)

 

16(C) Construction, infrastructure,
17redevelopment, renovation and related
18costs for a new educational facility
19on the campus of Villanova University
20for Academy of Notre Dame de Namur

 

21Project Allocation

5,000,000

22(Base Project Allocation - $5,000,000)

 

23(viii) Springfield Township

 

24(A) Construction, infrastructure,
25renovation and related costs for the
26redevelopment of township public
27safety and public recreational
28facilities

 

29Project Allocation

2,500,000

30(Base Project Allocation - $2,500,000)

 

1(24) Elk County (Reserved)

 

2(25) Erie County

 

3(i) County projects (Reserved)

 

4(ii) Harborcreek Township

 

5(A) Construction, renovation and related
6costs for the renovation and expansion
7of the municipal building

 

8Project Allocation

1,500,000

9(Base Project Allocation - $1,500,000)

 

10(26) Fayette County (Reserved)

 

11(27) Forest County (Reserved)

 

12(28) Franklin County

 

13(i) County projects (Reserved)

 

<-14(ii) Antrim Township

 

15(A) Acquisition, construction,
16infrastructure and other related costs
17for a new tissue paper manufacturing
18and distribution operation

 

19Project Allocation

5,000,000

20Base Project Allocation - $5,000,000)

 

21(ii) <-(iii) Greene Township

 

22(A) Rehabilitation of existing aviation
<-23facilities and construction of new
24hangars, taxiways and airport related
25buildings at Franklin County Regional
26Airport

 

27Project Allocation

700,000

28(Base Project Allocation - $700,000)

 

29(B) <-(A) Construction, infrastructure,
30acquisition and related costs for an

 

1economic development project at
2Franklin County Regional Airport

 

3Project Allocation

5,000,000

4(Base Project Allocation - $5,000,000)

 

5(29) Fulton County (Reserved)

 

6(30) Greene County (Reserved)

 

7(31) Huntingdon County (Reserved)

 

8(32) Indiana County (Reserved)

 

9(33) Jefferson County (Reserved)

 

10(34) Juniata County (Reserved)

 

11(35) Lackawanna County (Reserved)

<-

12(i) County projects (Reserved)

<-

13(ii) Moscow Borough

 

14(A) Construction, acquisition,
15infrastructure, redevelopment,
16abatement of hazardous materials,
17renovation, rehabilitation and other
18related costs for an economic
19development project

 

20Project Allocation

2,500,000

21(Base Project Allocation - $2,500,000)

 

22(36) Lancaster County

 

23(i) County projects (Reserved)

 

<-24(ii) City of Lancaster

 

25(A) Construction, infrastructure and
26other related costs for library
27expansion project

 

28Project Allocation

5,000,000

29(Base Project Allocation - $5,000,000)

 

30(B) Construction, infrastructure,

 

1redevelopment and other related costs
2for development of downtown

 

3Project Allocation

15,000,000

4(Base Project Allocation -
5$15,000,000)

 

6(C) Construction, infrastructure,
7redevelopment and other related costs
8for development of central market
9district

 

10Project Allocation

10,000,000

11(Base Project Allocation -
12$10,000,000)

 

13(D) Acquisition, construction,
14infrastructure, redevelopment and
15other related costs for revitalization
16initiatives in northwestern area

 

17Project Allocation

15,000,000

18(Base Project Allocation -
19$15,000,000)

 

20(E) Acquisition, construction,
21infrastructure, redevelopment and
22other related costs for revitalization
23initiatives in northeastern area

 

24Project Allocation

10,000,000

25(Base Project Allocation -
26$10,000,000)

 

27(F) Acquisition, construction,
28infrastructure, redevelopment and
29other related costs for revitalization
30initiatives in southwestern area

 

1Project Allocation

7,000,000

2(Base Project Allocation - $7,000,000)

 

3(ii) <-(iii) Columbia Borough

 

4(A) Construction, infrastructure,
5redevelopment, renovation and related
6costs for the Columbia Market House

 

7Project Allocation

500,000

8(Base Project Allocation - $500,000)

 

9(iii) <-(iv) East Lampeter Township

 

10(A) Construction, infrastructure,
11renovation and related costs for the
12development of a recreational area

 

13Project Allocation

1,000,000

14(Base Project Allocation - $1,000,000)

 

15(B) Construction, infrastructure,
16acquisition, renovation and related
17costs for the redevelopment of the
18Lancaster Host property

 

19Project Allocation

2,500,000

20(Base Project Allocation - $2,500,000)

 

<-21(v) Lititz Borough

 

22(A) Construction, infrastructure,
23acquisition, redevelopment and related
24costs for constructing a
25multistructure mixed use development

 

26Project Allocation

8,000,000

27(Base Project Allocation - $8,000,000)

 

28(iv) <-(vi) Manheim Borough

 

29(A) Construction, infrastructure and
30related costs for a police department

 

1building

 

2Project Allocation

1,500,000

3(Base Project Allocation - $1,500,000)

 

<-4(B) Construction, infrastructure,
5renovation and related costs for
6expansion and other changes to the
7Alumax Mill Products plant and
8property

 

9Project Allocation

1,000,000

10(Base Project Allocation - $1,000,000)

 

11(vii) Strasburg Township

 

12(A) Acquisition, construction,
13infrastructure and other related costs
14for Strasburg Rail Road redevelopment
15and rehabilitation projects

 

16Project Allocation

10,500,000

17(Base Project Allocation -
18$10,500,000)

 

19(v) <-(viii) West Lampeter Township

 

20(A) Construction, redevelopment,
21renovation and related costs for
22upgrades and improvements to Village
23Park

 

24Project Allocation

1,500,000

25(Base Project Allocation - $1,500,000)

 

26(37) Lawrence County

 

27(i) County projects

 

28(A) Construction, acquisition,
29infrastructure, redevelopment,
30abatement of hazardous materials,

 

1renovation, rehabilitation and other
2related costs for the development of a
3former cement plant in Bessemer and 
4Mahoning Boroughs <-Borough and Mahoning 
5Township<-

 

6Project Allocation

10,000,000

7(Base Project Allocation -
8$10,000,000)

 

9(B) Construction, acquisition,
10infrastructure, redevelopment,
11abatement of hazardous materials,
12renovation, rehabilitation and other
13related costs to assist in the
14development of the equine industry

 

15Project Allocation

5,000,000

16(Base Project Allocation - $5,000,000)

 

17(C) Construction, acquisition,
18infrastructure, redevelopment,
19abatement of hazardous materials,
20renovation, rehabilitation and other
21related costs to assist with the
22removal of blight

 

23Project Allocation

7,250,000

24(Base Project Allocation - $7,250,000)

 

25(D) Construction, acquisition,
26infrastructure, redevelopment,
27abatement of hazardous materials,
28renovation, rehabilitation and other
29related costs for the redevelopment of
30the I-376 industrial/commercial

 

1corridor

 

2Project Allocation

12,500,000

3(Base Project Allocation -
4$12,500,000)

 

5(E) Construction, acquisition,
6infrastructure, redevelopment,
7abatement of hazardous materials,
8renovation, rehabilitation and other
9related costs for the development of
10the Route 18 industrial/commercial
11corridor

 

12Project Allocation

12,500,000

13(Base Project Allocation -
14$12,500,000)

 

15(F) Construction, acquisition,
16infrastructure, redevelopment,
17abatement of hazardous materials,
18renovation, rehabilitation and other
19related costs for the development of
20Route 65 industrial/commercial
21corridor

 

22Project Allocation

5,000,000

23(Base Project Allocation - $5,000,000)

 

24(G) Construction, acquisition,
25infrastructure, redevelopment,
26abatement of hazardous materials,
27renovation, rehabilitation and other
28related costs for the development of
29Route 422 industrial/commercial
30corridor

 

1Project Allocation

12,500,000

2(Base Project Allocation -
3$12,500,000)

 

4(ii) City of New Castle

 

5(A) Construction, infrastructure,
6redevelopment, abatement of hazardous
7materials for a compressed natural gas
8filling station for the needs of
9public and nonpublic vehicle fleets

 

10Project Allocation

1,000,000

11(Base Project Allocation - $1,000,000)

 

12(B) Construction, infrastructure,
13redevelopment, renovation,
14rehabilitation and other related costs
15for the YMCA

 

16Project Allocation

1,000,000

17(Base Project Allocation - $1,000,000)

 

18(C) Construction, acquisition,
19infrastructure, redevelopment,
20abatement of hazardous materials,
21renovation, rehabilitation and other
22related costs for the redevelopment of
23commercial sites

 

24Project Allocation

10,000,000

25(Base Project Allocation -
26$10,000,000)

 

27(D) Construction, acquisition,
28infrastructure, redevelopment,
29abatement of hazardous materials,
30renovation, rehabilitation and other

 

1related costs for a heavy industrial
2facility

 

3Project Allocation

5,000,000

4(Base Project Allocation - $5,000,000)

 

5(iii) Hickory Township

 

6(A) Construction, acquisition,
7infrastructure and other related costs
8to construct a 911 Emergency and
9Training Center

 

10Project Allocation

10,000,000

11(Base Project Allocation -
12$10,000,000)

 

13(iv) Neshannock Township

 

14(A) Construction, acquisition,
15infrastructure and other related costs
16for the development of the Millennium
17Technology Park

 

18Project Allocation

15,000,000

19(Base Project Allocation -
20$15,000,000)

 

21(v) New Beaver Borough

 

22(A) Construction, acquisition,
23infrastructure, redevelopment,
24abatement of hazardous materials,
25renovation, rehabilitation and other
26related costs for the redevelopment of
27a business park

 

28Project Allocation

3,000,000

29(Base Project Allocation - $3,000,000)

 

30(38) Lebanon County

 

1(i) County projects

 

2(A) Acquisition, construction,
3infrastructure and related costs for
4new or renovated health care related
5capital facilities or equipment at
6various locations within the county
7for Good Samaritan Hospital and any
8successor

 

9Project Allocation

5,000,000

10(Base Project Allocation - $5,000,000)

 

11(ii) Palmyra Borough

 

12(A) Construction, infrastructure and
13related costs of a new fire station
14for the Palmyra Fire Department

 

15Project Allocation

2,000,000

16(Base Project Allocation - $2,000,000)

 

17(39) Lehigh County

 

18(i) County projects (Reserved)

 

19(ii) City of Allentown

 

20(A) Construction, renovation,
21infrastructure, redevelopment,
22abatement of hazardous materials and
23other related costs for Pool Science
24Center

 

25Project Allocation

1,000,000

26(Base Project Allocation - $1,000,000)

 

27(B) Construction, infrastructure,
28renovation and other related costs for
29expansion of Early Head Start-
30SafeStart program

 

1Project Allocation

500,000

2(Base Project Allocation - $500,000)

 

3(C) Construction, infrastructure,
4redevelopment, renovation and other
5related costs for the Phoebe Allentown
6Health Care Center

 

7Project Allocation

2,500,000

8(Base Project Allocation - $2,500,000)

 

9(D) Construction, renovation,
10rehabilitation and other related costs
11for a YMCA and YWCA facility

 

12Project Allocation

752,000

13(Base Project Allocation - $752,000)

 

14(E) Construction, renovation,
15infrastructure, redevelopment,
16abatement of hazardous materials and
17other related costs for Cedar Crest
18College redevelopment projects

 

19Project Allocation

2,000,000

20(Base Project Allocation - $2,000,000)

 

21(F) Construction, infrastructure,
22redevelopment, abatement of hazardous
23materials and other related costs at a
24former incinerator site

 

25Project Allocation

3,000,000

26(Base Project Allocation - $3,000,000)

 

27(G) Construction, infrastructure,
28redevelopment, abatement of hazardous
29materials, renovation, rehabilitation
30and other related costs for a former

 

1manufacturing site

 

2Project Allocation

5,000,000

3(Base Project Allocation - $5,000,000)

 

4(H) Acquisition, construction,
5infrastructure, redevelopment and
6other related costs of a multiuse
7residential, commercial and parking
8facility

 

9Project Allocation

5,000,000

10(Base Project Allocation - $5,000,000)

 

11(I) Construction, renovation
12rehabilitation and other related costs
13of a mixed use development located in
14or near a former silk mill building

 

15Project Allocation

4,000,000

16(Base Project Allocation - $4,000,000)

 

<-17(J) Acquisition, construction,
18infrastructure, renovation and other
19related costs for a manufacturing and
20industrial multitenant park

 

21Project Allocation

20,000,000

22(Base Project Allocation -
23$20,000,000)

 

24(K) Renovation and other related costs
25for improvements to the former Lucent
26SemiConductor office building

 

27Project Allocation

5,000,000

28(Base Project Allocation - $5,000,000)

 

29(L) Construction, infrastructure and
30other related costs for a mixed use

 

1residential cottage development

 

2Project Allocation

3,000,000

3(Base Project Allocation - $3,000,000)

 

4(M) Construction, redevelopment,
5renovation and other related costs for
6America On Wheels Museum

 

7Project Allocation

500,000

8(Base Project Allocation - $500,000)

 

9(N) Construction, infrastructure,
10renovation and other related costs for
11Allentown Art Museum

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

14(iii) Heidelberg Township

 

15(A) Construction, infrastructure and
16related costs for a new municipal
17facility service center

 

18Project Allocation

600,000

19(Base Project Allocation - $600,000)

 

20(iv) Lynn Township

 

21(A) Construction, redevelopment and
22related costs for the expansion and
23renovation of the New Tripoli fire
24station

 

25Project Allocation

855,000

26(Base Project Allocation - $855,000)

 

27(v) Upper Macungie Township

 

28(A) Acquisition, construction and related
29costs to purchase land and construct a
30truck inspection/weigh station for

 

1area police use

 

2Project Allocation

500,000

3(Base Project Allocation - $500,000)

 

4(B) Construct parking, sidewalks,
5landscaping and intersection
6improvement on Hamilton Boulevard and
7Trexlertown Road

 

8Project Allocation

500,000

9(Base Project Allocation - $500,000)

 

10(C) Acquisition, construction,
11infrastructure and related costs for a
12new Parkland Community Library
13building

 

14Project Allocation

1,000,000

15(Base Project Allocation - $1,000,000)

 

16(D) Construction, acquisition,
17infrastructure and related costs for
18the West End Gateway Park and Ride
19facility

 

20Project Allocation

500,000

21(Base Project Allocation - $500,000)

 

22(40) Luzerne County (Reserved)

<-

23(i) County projects (Reserved)

<-

24(ii) City of Pittston

 

25(A) Construction, acquisition,
26infrastructure, redevelopment,
27abatement of hazardous materials,
28renovation, rehabilitation and other
29related costs for an economic
30development project

 

1Project Allocation

3,500,000

2(Base Project Allocation - $3,500,000)

 

3(41) Lycoming County

 

4(i) County projects

 

5(A) Infrastructure, construction and
6related costs for development of the
7Timber Run Industrial Park in Brady
8and Gregg Townships

 

9Project Allocation

1,200,000

10(Base Project Allocation - $1,200,000)

 

11(ii) City of Williamsport

 

12(A) Acquisition, remediation,
13construction, infrastructure and
14related costs for redevelopment of
15brownfield sites

 

16Project Allocation

5,000,000

17(Base Project Allocation - $5,000,000)

 

18(B) Construction, infrastructure,
19acquisition, renovation and related
20costs for an economic development
21initiative within the Old City area
22and the Gateway Commission area

 

23Project Allocation

2,300,000

24(Base Project Allocation - $2,300,000)

 

<-25(C) Construction, infrastructure,
26renovation and other related costs for
27a multicultural community center

 

28Project Allocation

1,000,000

29(Base Project Allocation - $1,000,000

 

30(D) Construction, infrastructure,

 

1renovation and other related costs for
2a project at Williamsport Area School
3District

 

4Project Allocation

500,000

5(Base Project Allocation - $500,000

 

6(E) Construction, infrastructure,
7renovation, redevelopment and other
8related costs for a stadium at Bowman
9Field

 

10Project Allocation

1,500,000

11(Base Project Allocation - $1,500,000

 

12(F) Acquisition, construction,
13infrastructure, redevelopment,
14renovation and other related costs for
15East End Revitalization project

 

16Project Allocation

3,000,000

17(Base Project Allocation - $3,000,000

 

18(G) Acquisition, construction,
19infrastructure, redevelopment,
20renovation, abatement of hazardous
21materials and other related costs for
22renovations to a church in a
23historical district

 

24Project Allocation

5,000,000

25(Base Project Allocation - $5,000,000

 

26(iii) Muncy Township

 

27(A) Renovation and expansion of Eastern
28Lycoming YMCA Community Center

 

29Project Allocation

1,000,000

30(Base Project Allocation - $1,000,000)

 

1(42) McKean County

 

2(i) County projects (Reserved)

 

3(ii) City of Bradford

 

4(A) Redevelopment, acquisition,
5infrastructure and related costs for
6recreational improvements, renovation
7of existing facilities and the
8construction of new facilities in city
9owned parks and the Kessel Athletic
10Complex and the continued development
11of the Tuna Valley Trail Association
12Trail System

 

13Project Allocation

5,000,000

14(Base Project Allocation - $5,000,000)

 

15(B) Acquisition of property, demolition,
16renovation, new construction and
17related costs including infrastructure
18improvements for the development of
19housing to stabilize aging and
20declining housing stock

 

21Project Allocation

5,000,000

22(Base Project Allocation - $5,000,000)

 

<-23(C) Site clearance, demolition,
24infrastructure, construction,
25equipment and other related costs to
26American Refining Group for refinement
27of Pennsylvania Grade crude oils

 

28Project Allocation

10,000,000

29(Base Project Allocation - $10,000,000

 

30(43) Mercer County

 

1(i) County projects

 

2(A) Acquisition, infrastructure,
3redevelopment, abatement of hazardous
4materials and other related costs to
5redevelop blighted areas in Mercer
6County

 

7Project Allocation

2,500,000

8(Base Project Allocation - $2,500,000)

 

9(B) Construction, infrastructure and
10other related costs for an economic
11development project in Mercer County

 

12Project Allocation

2,000,000

13(Base Project Allocation - $2,000,000)

 

14(ii) City of Farrell

 

15(A) Acquisition, infrastructure,
16redevelopment, abatement of hazardous
17materials and other related costs to
18redevelop a blighted area

 

19Project Allocation

1,500,000

20(Base Project Allocation - $1,500,000)

 

21(iii) City of Sharon

 

22(A) Construction, infrastructure,
23redevelopment and other related costs
24for redevelopment activities in
25downtown City of Sharon

 

26Project Allocation

500,000

27(Base Project Allocation - $500,000)

 

28(iv) Greene Township

 

29(A) Construction, infrastructure,
30redevelopment, renovation and related

 

1costs for equipment and the expansion
2of Combined Systems, Inc.

 

3Project Allocation

4,000,000

4(Base Project Allocation - $4,000,000)

 

5(44) Mifflin County (Reserved)

<-

6(i) County projects (Reserved)

<-

7(ii) Derry Township

 

8(A) Construction, acquisition,
9infrastructure and related costs for
10the development of a parcel for a new
11Life Sciences Complex

 

12Project Allocation

4,000,000

13(Base Project Allocation - $4,000,000)

 

14(iii) Granville Township

 

15(A) Construction, infrastructure,
16renovation, abatement of hazardous
17materials and related costs for the
18redevelopment of a brownfield site and
19buildings with the MCIDC Plaza

 

20Project Allocation

3,000,000

21(Base Project Allocation - $3,000,000)

 

22(iv) Lewistown Borough

 

23(A) Construction, acquisition,
24infrastructure and related costs for
25the renovation of an industrial
26facility

 

27Project Allocation

1,250,000

28(Base Project Allocation - $1,250,000)

 

29(45) Monroe County

 

30(i) County projects (Reserved)

 

<-1(ii) East Stroudsburg Borough

 

2(A) Acquisition, construction,
3infrastructure, renovation and related
4costs for Pocono Chamber of Commerce
5building

 

6Project Allocation

500,000

7(Base Project Allocation - $500,000)

 

8(ii) <-(iii) Mount Pocono Borough

 

9(A) Construction, infrastructure and
10related costs for expansion of a fire
11company building

 

12Project Allocation

750,000

13(Base Project Allocation - $750,000)

 

14(46) Montgomery County

 

15(i) County projects (Reserved)

 

16(ii) Cheltanham Township

 

17(A) Renovation, rehabilitation and other
18related costs of Salus University
19facilities in Elkins Park

 

20Project Allocation

2,500,000

21(Base Project Allocation - $2,500,000)

 

<-22(B) Construction, infrastructure and
23other related costs for sidewalk
24infrastructure and streetscape
25development

 

26Project Allocation

3,000,000

27(Base Project Allocation - $3,000,000)

 

28(C) Construction, renovation and other
29related costs for township
30administration building

 

1Project Allocation

5,000,000

2(Base Project Allocation - $5,000,000)

 

3(D) Acquisition, construction,
4infrastructure, redevelopment and
5other related costs for public parking
6downtown

 

7Project Allocation

750,000

8(Base Project Allocation - $750,000)

 

9(E) Construction, infrastructure and
10other related costs for streetscape
11enhancements, signage and traffic
12improvements

 

13Project Allocation

1,829,000

14(Base Project Allocation - $1,829,000)

 

15(F) Acquisition, construction,
16infrastructure, redevelopment and
17other related costs for relocation of
18public works facility

 

19Project Allocation

7,500,000

20(Base Project Allocation - $7,500,000)

 

21(iii) Conshohocken Borough

 

22(A) Construction, redevelopment and other
23related costs for the construction of
24an office headquarters in Conshohocken

 

25Project Allocation

8,000,000

26(Base Project Allocation - $8,000,000)

 

27(iv) Hatfield Borough

 

28(A) Construction, infrastructure,
29redevelopment, renovation and related
30costs for a new borough office

 

1Project Allocation

1,500,000

2(Base Project Allocation - $1,500,000)

 

<-3(v) Hatfield Township

 

4(A) Acquisition and related costs for
5development of green space

 

6Project Allocation

1,000,000

7(Base Project Allocation - $1,000,000)

 

8(vi) Horsham Township

 

9(A) Construction, infrastructure and
10related costs for a new municipal
11building

 

12Project Allocation

4,000,000

13(Base Project Allocation - $4,000,000)

 

14(v) <-(vii) Lower Gwynedd Township

 

15(A) Construction, infrastructure and
16related costs for a new fire and
17ambulance substation

 

18Project Allocation

1,250,000

19(Base Project Allocation - $1,250,000)

 

20(vi) <-(viii) Lower Merion Township

 

21(A) Construction, infrastructure,
22renovation and other related costs for
23the Bryn Mawr Hospital

 

24Project Allocation

10,000,000

25(Base Project Allocation -
26$10,000,000)

 

<-27(B) Construction, renovation and other
28related costs for Merion Mercy Academy
29construction project

 

30Project Allocation

7,000,000

1(Base Project Allocation - $7,000,000)

 

2(vii) <-(ix) Pottstown Borough

 

3(A) Construction, rehabilitation and
4related costs for the renovation of
5the Pottstown Regional Public Library

 

6Project Allocation

500,000

7(Base Project Allocation - $500,000)

 

8(B) Construction, infrastructure,
9renovation and related costs for the
10rehabilitation and improvements to the
11Pottstown Regional Public Library

 

12Project Allocation

500,000

13(Base Project Allocation - $500,000)

 

<-14(x) Springfield Township

 

15(A) Construction, infrastructure,
16redevelopment and other related costs
17for East Mill Road Bridge

 

18Project Allocation

1,516,000

19(Base Project Allocation - $1,516,000)

 

20(viii) <-(xi) Whitpain Township

 

21(A) Construction infrastructure,
22redevelopment and related costs for a
23new firehouse

 

24Project Allocation

2,000,000

25(Base Project Allocation - $2,000,000)

 

26(B) Construction, acquisition,
27infrastructure, redevelopment,
28renovation, rehabilitation, abatement
29of hazardous materials and other costs
30related to the Ambler Area Boys and

 

1Girls Club

 

2Project Allocation

4,000,000

3(Base Project Allocation - $4,000,000)

 

4(47) Montour County (Reserved)

 

5(48) Northampton County

 

6(i) County projects (Reserved)

 

<-7(ii) City of Bethlehem

 

8(A) Construction, infrastructure and
9related costs for the renovation of a
10building for office space for Lehigh
11University and shared community space

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

14(B) Construction, infrastructure and
15related costs for the renovation of a
16blighted property for Lehigh
17University Mountaintop Campus

 

18Project Allocation

10,000,000

19(Base Project Allocation -
20$10,000,000)

 

21(C) Construction, infrastructure,
22renovation and other related costs for
23expansion of Ben Franklin TechVentures
24incubator facility

 

25Project Allocation

3,000,000

26(Base Project Allocation - $3,000,000)

 

27(D) Acquisition of research facility and
28construction and other related costs
29for expansion, conservation and
30renovation of various historic

 

1properties of the historic Bethlehem
2partnership

 

3Project Allocation

4,000,000

4(Base Project Allocation - $4,000,000)

 

5(iii) Freemansburg Borough

 

6(A) Construction, infrastructure,
7renovation and other related costs for
8municipal police, fire, public works
9and administration buildings

 

10Project Allocation

1,800,000

11(Base Project Allocation - $1,800,000)

 

12(ii) <-(iv) Pen Argyl Borough

 

13(A) Construction and related costs for
14replacement of the Pen Argyl Public
15Municipal Pool

 

16Project Allocation

1,500,000

17(Base Project Allocation - $1,500,000)

 

18(B) Construction, infrastructure and
19related costs for a new fire company
20building

 

21Project Allocation

500,000

22(Base Project Allocation - $500,000)

 

23(C) Construction, infrastructure and
24related costs for the expansion of a
25YMCA building

 

26Project Allocation

500,000

27(Base Project Allocation - $500,000)

 

<-28(v) Williams Township

 

29(A) Construction, infrastructure,
30redevelopment and other related costs

 

1for municipal park development

 

2Project Allocation

500,000

3(Base Project Allocation - $500,000)

 

4(49) Northumberland County (Reserved)

<-

5(i) County projects (Reserved)

<-

6(ii) City of Shamokin

 

7(A) Acquisition, demolition, renovation,
8abatement of hazardous materials,
9construction and related costs for the
10removal and redevelopment of blighted
11and abandoned properties

 

12Project Allocation

1,500,000

13(Base Project Allocation - $1,500,000)

 

14(B) Acquisition, renovation, abatement of
15hazardous materials and related costs
16for the removal and redevelopment of
17an abandoned factory

 

18Project Allocation

500,000

19(Base Project Allocation - $500,000)

 

20(iii) Milton Borough

 

21(A) Construction, redevelopment,
22renovations and related costs to
23expand and industrial facility

 

24Project Allocation

5,000,000

25(Base Project Allocation - $5,000,000)

 

26(iv) Ralpho Township

 

27(A) Construction, infrastructure,
28renovation and related costs to
29address recreation and civic projects,
30including All Home Days Park and

 

1township buildings

 

2Project Allocation

500,000

3(Base Project Allocation - $500,000)

 

4(50) Perry County

 

5(i) County projects

 

6(A) Land acquisition, infrastructure
7improvements, demolition, site
8improvement, renovation, addition,
9utility expansion, construction,
10purchase of medically necessary
11fixtures and other related costs for
12facilities of the Holy Spirit Health
13System

 

14Project Allocation

10,000,000

15(Base Project Allocation -
16$10,000,000)

 

17(51) Philadelphia County

 

18(i) County projects

 

19(A) Renovation and related costs for
20First Tee of Greater Philadelphia

 

21Project Allocation

500,000

22(Base Project Allocation - $500,000)

 

<-23(B) Construction, infrastructure,
24renovation and other related costs for
25Thomas Jefferson University and TJUH
26System

 

27Project Allocation

10,000,000

28(Base Project Allocation -
29$10,000,000)

 

30(ii) City of Philadelphia

 

1(A) Acquisition, construction,
2infrastructure, redevelopment,
3renovation, rehabilitation, abatement
4of hazardous materials and other
5related costs to revitalize commercial
6corridors in northwest Philadelphia,
7including Vernon Road, Chew Avenue and
8other surrounding areas

 

9Project Allocation

2,500,000

10(Base Project Allocation - $2,500,000)

 

11(B) Acquisition, construction,
12infrastructure, redevelopment,
13renovation, rehabilitation, abatement
14of hazardous materials and other
15related costs to create, enhance and
16develop recreational facilities and
17athletic fields in northwest
18Philadelphia

 

19Project Allocation

2,500,000

20(Base Project Allocation - $2,500,000)

 

21(C) Acquisition, construction,
22infrastructure, redevelopment,
23renovation, rehabilitation, abatement
24of hazardous materials and other
25related costs for the Northwest
26Philadelphia Redevelopment Project to
27revitalize commercial corridors,
28recreational facilities and other
29community improvements

 

30Project Allocation

5,000,000

1(Base Project Allocation - $5,000,000)

 

2(D) Construction, renovation,
3infrastructure, redevelopment and
4abatement of hazardous materials and
5other related costs for the Reading
6Viaduct project

 

7Project Allocation

3,500,000

8(Base Project Allocation - $3,500,000)

 

9(E) Construction, infrastructure and
10other related costs for a YMCA branch
11expansion in West Philadelphia

 

12Project Allocation

2,000,000

13(Base Project Allocation - $2,000,000)

 

14(F) Construction, infrastructure,
15renovation, rehabilitation and other
16related costs for the Wistar Institute
17biomedical laboratory project

 

18Project Allocation

4,000,000

19(Base Project Allocation - $4,000,000)

 

<-20(G) Construction, infrastructure,
21redevelopment, renovation, abatement
22of hazardous materials and other
23related costs for Hill Freedman School

 

24Project Allocation

2,500,000

25(Base Project Allocation - $2,500,000)

 

26(H) Acquisition, construction,
27infrastructure, redevelopment,
28renovation and other related costs for
29the Business Center for
30Entrepreneurship and Social Enterprise

 

1Project Allocation

500,000

2(Base Project Allocation - $500,000)

 

3(I) Acquisition, construction,
4infrastructure and other related costs
5for a mixed-use housing, science and
6technology and health and wellness
7trauma care facility

 

8Project Allocation

2,500,000

9(Base Project Allocation - $2,500,000)

 

10(J) Acquisition, construction,
11infrastructure and other related costs
12for Beloved House Community Center

 

13Project Allocation

1,000,000

14(Base Project Allocation - $1,000,000)

 

15(K) Acquisition, construction,
16infrastructure, redevelopment,
17renovation and other related costs to
18rehabilitate an abandoned building for
19residential and commercial use

 

20Project Allocation

3,000,000

21(Base Project Allocation - $3,000,000)

 

22(L) Acquisition, construction,
23infrastructure, redevelopment,
24renovation and other related costs to
25rehabilitate an abandoned building for
26use by light manufacturing companies

 

27Project Allocation

1,000,000

28(Base Project Allocation - $1,000,000)

 

29(M) Acquisition, construction,
30redevelopment, renovation and other

 

1related costs to rehabilitate a
2building for use as an education and
3youth activity facility

 

4Project Allocation

500,000

5(Base Project Allocation - $500,000)

 

6(N) Acquisition, construction,
7infrastructure, redevelopment and
8other related costs for a retail
9family restaurant

 

10Project Allocation

2,000,000

11(Base Project Allocation - $2,000,000)

 

12(O) Acquisition, construction,
13infrastructure, redevelopment and
14other related costs for rehabilitation
15of property into commercial and retail
16use

 

17Project Allocation

4,000,000

18(Base Project Allocation - $4,000,000)

 

19(P) Construction, infrastructure,
20redevelopment and other related costs
21for community care campus

 

22Project Allocation

3,000,000

23(Base Project Allocation - $3,000,000)

 

24(Q) Acquisition, construction,
25infrastructure, renovation and other
26related costs for facility upgrades at
27Aker Philadelphia Shipyard

 

28Project Allocation

15,000,000

29(Base Project Allocation -
30$15,000,000)

 

1(R) Acquisition, demolition,
2improvements, redevelopment and other
3related costs to develop retail,
4office and residential properties

 

5Project Allocation

10,000,000

6(Base Project Allocation -
7$10,000,000)

 

8(S) Construction, infrastructure and
9other related costs to revitalize FDR
10Park

 

11Project Allocation

3,000,000

12(Base Project Allocation - $3,000,000)

 

13(T) Acquisition, construction,
14infrastructure, renovation and other
15related costs for Philadelphia
16Performing Arts Charter School

 

17Project Allocation

7,500,000

18(Base Project Allocation - $7,500,000)

 

19(U) Acquisition, construction,
20infrastructure, demolition and other
21related costs for development of an
22educational facility on the 2300 block
23of Swanson Street

 

24Project Allocation

2,500,000

25(Base Project Allocation - $2,500,000)

 

26(V) Acquisition, construction and other
27related costs for a charter school on
28South Front Street

 

29Project Allocation

10,000,000

30(Base Project Allocation -

 

1$10,000,000)

 

2(W) Acquisition, demolition,
3construction, infrastructure and other
4related costs for the development of
5an educational facility on the first
6block of Wolf Street

 

7Project Allocation

2,500,000

8(Base Project Allocation - $2,500,000)

 

9(X) Acquisition, construction,
10demolition, redevelopment and other
11related costs for an educational
12facility in South Philadelphia

 

13Project Allocation

10,000,000

14(Base Project Allocation -
15$10,000,000)

 

16(Y) Acquisition, construction,
17demolition, redevelopment,
18infrastructure and other related costs
19for a training facility in South
20Philadelphia

 

21Project Allocation

10,000,000

22(Base Project Allocation -
23$10,000,000)

 

24(Z) Acquisition, construction and other
25related costs for the Philadelphia
26Polytechnic Charter High School

 

27Project Allocation

10,000,000

28(Base Project Allocation -
29$10,000,000)

 

30(AA) Construction, acquisition and other

 

1related costs for a residential
2housing project on the 400 block of
3Cantrell Street

 

4Project Allocation

10,000,000

5(Base Project Allocation -
6$10,000,000)

 

7(BB) Construction, acquisition and other
8related costs for a residential
9housing project on the 500 block of
10Mercy Street

 

11Project Allocation

10,000,000

12(Base Project Allocation -
13$10,000,000)

 

14(CC) Acquisition, construction and other
15related costs for an economic
16development project at 21 Wolf Street

 

17Project Allocation

10,000,000

18(Base Project Allocation -
19$10,000,000)

 

20(DD) Acquisition, construction and other
21related costs for a training and
22education center at 3670 South
23Lawrence Street

 

24Project Allocation

10,000,000

25(Base Project Allocation -
26$10,000,000)

 

27(EE) Acquisition, construction and other
28related costs for a computer and
29billboard design training center at
302200 Weccacoe Avenue

 

1Project Allocation

10,000,000

2(Base Project Allocation -
3$10,000,000)

 

4(FF) Construction, acquisition,
5demolition, redevelopment and other
6costs associated with the South
7Philadelphia Housing revitalization

 

8Project Allocation

10,000,000

9(Base Project Allocation -
10$10,000,000)

 

11(GG) Land acquisition, infrastructure,
12improvements, rehabilitation, new
13construction and removal of blight
14from the South Philadelphia area

 

15Project Allocation

1,000,000

16(Base Project Allocation - $1,000,000)

 

17(HH) Acquisition, demolition,
18improvements and redevelopment of
19vacant lots and structures

 

20Project Allocation

5,000,000

21(Base Project Allocation - $5,000,000)

 

22(II) Construction, infrastructure and
23other related costs for a waste-to-
24rail transfer station

 

25Project Allocation

6,424,000

26(Base Project Allocation - $6,424,000)

 

27(JJ) Acquisition, demolition,
28improvements and redevelopment of
29vacant lots and structures located at
302930 Jasper Street

 

1Project Allocation

1,000,000

2(Base Project Allocation - $1,000,000)

 

3(KK) Land acquisition, infrastructure,
4improvements, rehabilitation, new
5construction and removal of blight
6from the South Philadelphia area

 

7Project Allocation

1,000,000

8(Base Project Allocation - $1,000,000)

 

9(LL) Infrastructure, acquisition,
10construction, renovation and other
11related costs for the South Philly
12Project 2300 Arena

 

13Project Allocation

5,000,000

14(Base Project Allocation - $5,000,000)

 

15(MM) Development of new intermodal
16facility to assist in increasing Port
17of Philadelphia container business

 

18Project Allocation

6,000,000

19(Base Project Allocation - $6,000,000)

 

20(NN) Development of new intermodal
21facility to assist in increasing Port
22of Philadelphia container business

 

23Project Allocation

6,000,000

24(Base Project Allocation - $6,000,000)

 

25(OO) Material drop yard and recycling
26center

 

27Project Allocation

5,000,000

28(Base Project Allocation - $5,000,000)

 

29(PP) Construction, infrastructure,
30redevelopment, renovation and other

 

1related costs for Sterling mixed-use
2apartments, retail and commercial
3space

 

4Project Allocation

5,000,000

5(Base Project Allocation - $5,000,000)

 

6(QQ) Acquisition, construction,
7infrastructure, redevelopment,
8renovation and other related costs for
9Philadelphia FIGHT clinic space
10expansion

 

11Project Allocation

1,000,000

12(Base Project Allocation - $1,000,000)

 

13(RR) Construction, infrastructure,
14redevelopment and other related costs
15for a greenway along the west bank of
16the Schuylkill River from south of
17Bartram's Garden to the vicinity of
18Passyunk Avenue

 

19Project Allocation

2,000,000

20(Base Project Allocation - $2,000,000)

 

21(SS) Acquisition, construction,
22infrastructure, redevelopment,
23renovation and other related costs for
24development at 31st and Reed Streets

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(TT) Acquisition, construction,
28infrastructure, redevelopment and
29other related costs for ARIA Health
30System facilities to provide medical

 

1services, conduct research, provide
2housing and other related activities

 

3Project Allocation

15,000,000

4(Base Project Allocation -
5$15,000,000)

 

6(UU) Construction, renovation and
7infrastructure improvements for an
8industrial facility at the Northeast
9Philadelphia Airport

 

10Project Allocation

10,000,000

11(Base Project Allocation -
12$10,000,000)

 

13(VV) Acquisition, construction,
14infrastructure, redevelopment,
15creation of green space and other
16related costs for the Carpenter Green
17Project

 

18Project Allocation

500,000

19(Base Project Allocation - $500,000)

 

20(52) Pike County (Reserved)

 

21(53) Potter County (Reserved)

 

22(54) Schuylkill County

 

23(i) County projects (Reserved)

 

24(ii) East Union Township

 

25(A) Construction, infrastructure,
26renovation, rehabilitation and other
27related costs for infrastructure
28improvements to Municipal Authority of
29the Shenandoah Borough facilities

 

30Project Allocation

1,000,000

1(Base Project Allocation - $1,000,000)

 

2(iii) West Mahanoy Township

 

3(A) Construction, renovations and related
4costs for a fire training facility

 

5Project Allocation

500,000

6(Base Project Allocation - $500,000)

 

7(55) Snyder County (Reserved)

 

8(56) Somerset County (Reserved)

 

9(57) Sullivan County (Reserved)

 

10(58) Susquehanna County

 

11(i) County projects

 

12(A) Construction, infrastructure,
13acquisition and related costs for the
14development of a new business park

 

15Project Allocation

1,500,000

16(Base Project Allocation - $1,500,000)

 

17(59) Tioga County (Reserved)

 

18(60) Union County (Reserved)

 

19(61) Venango County

 

20(i) County projects (Reserved)

 

21(ii) City of Oil City

 

22(A) Construction, rehabilitation and
23related costs for the renovation of
24Oil City Industrial Park

 

25Project Allocation

875,000

26(Base Project Allocation - $875,000)

 

27(62) Warren County (Reserved)

 

28(63) Washington County (Reserved)

 

29(64) Wayne County (Reserved)

 

30(65) Westmoreland County

 

1(i) County projects (Reserved)

 

2(ii) Ligonier Borough

 

3(A) Construction, redevelopment,
4renovation and related costs for the
5expansion of a museum and restoration
6of exhibits

 

7Project Allocation

800,000

8(Base Project Allocation - $800,000)

 

9(iii) Unity Township

 

10(A) Construction and related costs of
11academic facilities for Saint Vincent
12College

 

13Project Allocation

5,000,000

14(Base Project Allocation - $5,000,000)

 

15(66) Wyoming County (Reserved)

 

16(67) York County

 

17(i) County projects

 

18(A) Land acquisition, infrastructure
19improvements, demolition, site
20improvement, renovation, addition,
21utility expansion, construction,
22purchase of medically necessary
23fixtures and other related costs for
24facilities of the Holy Spirit Health
25System

 

26Project Allocation

10,000,000

27(Base Project Allocation -
28$10,000,000)

 

<-29(B) Acquisition, construction,
30infrastructure, redevelopment,

 

1renovation, abatement of hazardous
2materials and other related costs for
3demolition of former grain mill
4facility to construct a hotel and
5tourist amenities in the City of York
6and West York Borough

 

7Project Allocation

5,000,000

8(Base Project Allocation - $5,000,000)

 

9(ii) City of York

 

10(A) Acquisition, construction,
11infrastructure, redevelopment,
12renovation, abatement of hazardous
13materials and other related costs for
14historical hotel and parking structure

 

15Project Allocation

10,000,000

16(Base Project Allocation -
17$10,000,000)

 

18(B) Construction, infrastructure,
19redevelopment, renovation, abatement
20of hazardous materials and other
21related costs for the Goodridge House
22museum and memorial project

 

23Project Allocation

1,000,000

24(Base Project Allocation - $1,000,000)

 

25(C) Acquisition, construction,
26infrastructure, redevelopment,
27renovation, abatement of hazardous
28materials and other related costs for
29historic buildings in Royal Square
30Redevelopment Area

 

1Project Allocation

1,000,000

2(Base Project Allocation - $1,000,000)

 

3(D) Acquisition, construction,
4infrastructure, redevelopment,
5renovation and other related costs for
6the adaptive reuse of historic
7buildings

 

8Project Allocation

5,000,000

9(Base Project Allocation - $5,000,000)

 

10(E) Acquisition, construction,
11infrastructure, redevelopment,
12renovation and other related costs for
13Continental Square renovation project

 

14Project Allocation

3,500,000

15(Base Project Allocation - $3,500,000)

 

16(F) Acquisition, infrastructure,
17redevelopment, abatement of hazardous
18materials and other related costs for
19a biking and hiking trail

 

20Project Allocation

10,000,000

21(Base Project Allocation -
22$10,000,000)

 

23(ii) <-(iii) Fairview Township

 

24(A) Construction, infrastructure,
25acquisition and related costs for an
26economic development project at
27Capital City Airport

 

28Project Allocation

5,000,000

29(Base Project Allocation - $5,000,000)

 

<-30(B) Construction, infrastructure,

 

1acquisition, redevelopment and related
2costs for federally qualified health
3center facility

 

4Project Allocation

2,000,000

5(Base Project Allocation - $2,000,000)

 

6(iv) Hanover Borough

 

7(A) Construction, infrastructure,
8redevelopment, renovation and related
9costs for the revitalization/repurpose
10of a property to be used as the
11Heritage Conference Center

 

12Project Allocation

900,000

13(Base Project Allocation - $900,000)

 

14(iii) <-(v) Spring Garden Township

 

15(A) Construction, infrastructure and
16related costs for the redevelopment of
17the former Yorktowne Paper Mill site

 

18Project Allocation

10,000,000

19(Base Project Allocation -
20$10,000,000)

 

<-21(B) Acquisition, construction,
22infrastructure and other related costs
23for municipal facility

 

24Project Allocation

7,500,000

25(Base Project Allocation - $7,500,000)

 

26(vi) Springettsbury Township

 

27(A) Construction, redevelopment,
28infrastructure improvements and
29renovation/additions to an existing
30location to modernize the facility

 

1Project Allocation

3,500,000

2(Base Project Allocation - $3,500,000)

 

3(68) Multiple Counties

 

4(i) Beaver and Lawrence Counties

 

5(A) Construction, acquisition,
6infrastructure, abatement of hazardous
7materials, renovation, rehabilitation
8and other related costs of a public
9works building for the Ellwood City
10Borough

 

11Project Allocation

5,000,000

12(Base Project Allocation - $5,000,000)

 

13(B) Construction, acquisition,
14infrastructure, renovation,
15rehabilitation and other related costs
16for a public parks system in Ellwood
17City Borough

 

18Project Allocation

2,500,000

19(Base Project Allocation - $2,500,000)

 

<-20(ii) Berks and York Counties

 

21(A) Acquisition, construction,
22infrastructure, redevelopment,
23renovation, abatement of hazardous
24materials and other related costs for
25installation of a fiber optic network
26and the construction of data center
27facilities in Cities of York and
28Reading

 

29Project Allocation

25,000,000

30(Base Project Allocation -

 

1$25,000,000)

 

2Section 7. Itemization of flood control projects.

3Additional capital projects in the category of flood control
4projects to be constructed by the Department of Environmental
5Protection, its successors or assigns, and to be financed by the
6incurring of debt are hereby itemized, together with their
7respective estimated costs, as follows:

8 

9Project

Total Project

Allocation

10(1) Department of Environmental Protection

 

<-11(i) Bucks County

 

12(A) Flood mitigation, increase resiliency
13and address long-term flood
14sustainability for the Delaware Canal
15State Park

 

16Project Allocation

2,000,000

17(Base Project Allocation - $2,000,000)

 

18(B) Construction and other related costs
19for a spillway along the Delaware
20Canal Towpath in Morrisville Borough

 

21Project Allocation

750,000

22(Base Project Allocation - $750,000)

 

23(C) Construction and other related costs
24for flood mitigation projects in
25Yardley Borough

 

26Project Allocation

50,000

27(Base Project Allocation - $50,000)

 

28(D) Construction, renovation and other
29related costs to remove sediment and
30debris near CSX railroad bridge piers

 

1and the abandoned bridge piers in
2Yardley Borough

 

3Project Allocation

40,000

4(Base Project Allocation - $40,000)

 

5(E) Renovation and other related costs to
6remove sediment and debris near North
7Main Street Bridge in Yardley Borough

 

8Project Allocation

30,000

9(Base Project Allocation - $30,000)

 

10(i) <-(ii) Dauphin County

 

11(A) Construction, infrastructure,
12redevelopment, renovation and related
13costs for pedestrian safety, public
14improvements, campus security upgrades
15and flood control improvements at Penn
16State Hershey Medical Center

 

17Project Allocation

25,000,000

18(Base Project Allocation -
19$25,000,000)

 

20(B) Construction, acquisition,
21redevelopment, renovation and related
22costs for student pedestrian safety,
23infrastructure improvements, campus
24security upgrades and flood control
25improvements to Pennsylvania State
26University Harrisburg Campus

 

27Project Allocation

20,000,000

28(Base Project Allocation -
29$20,000,000)

 

<-30(iii) Delaware County

 

1(A) Design, construction and related
2costs for a stormwater pond BMP for
3stormwater management in Marple
4Township

 

5Project Allocation

61,000

6(Base Project Allocation - $61,000)

 

7(B) Construction, infrastructure and
8related costs for a stormwater
9management project in Radnor Township

 

10Project Allocation

2,000,000

11(Base Project Allocation - $2,000,000)

 

12(ii) <-(iv) Lycoming County

 

13(A) Construction and related costs for a
14flood mitigation project

 

15Project Allocation

3,000,000

16(Base Project Allocation - $3,000,000)

 

<-17(B) Construction, infrastructure,
18renovation and other related costs for
19a flood control system and study

 

20Project Allocation

2,000,000

21(Base Project Allocation - $2,000,000)

 

22(iii) <-(v) Montgomery County

 

23(A) Construction, infrastructure,
24renovation and related costs to
25replace failing stormwater culvert in
26Hatfield Borough

 

27Project Allocation

205,000

28(Base Project Allocation - $205,000)

 

<-29(B) Construction and related costs for
30multiple detention basins that are

 

1needed to reduce habitual downstream
2flooding in Horsham Township

 

3Project Allocation

375,000

4(Base Project Allocation - $375,000)

 

5(C) Acquisition and related costs for the
6purchase of a property located along
7an unnamed stream in the Neshaminy
8Creek Watershed that has been
9subjected to repetitive heavy flood
10damage, and repair and restore the
11riparian buffer and add additional
12flood controls to reduce habitual
13downstream flooding in Horsham
14Township

 

15Project Allocation

200,000

16(Base Project Allocation - $200,000)

 

17(D) Acquisition and related costs for the
18purchase of a property located along
19the Pennypack Creek that has been
20subjected to repetitive heavy flood
21damage, and repair and restore the
22riparian buffer and add additional
23flood controls to reduce habitual
24downstream flooding in Horsham
25Township

 

26Project Allocation

300,000

27(Base Project Allocation - $300,000)

 

28(vi) Montour County

 

29(A) Upgrades, renovations and related
30costs to Sechler Run Pumping Station

 

1in Danville Borough

 

2Project Allocation

3,000,000

3(Base Project Allocation - $3,000,000)

 

4(B) Acquisition, construction,
5infrastructure, renovation and other
6related costs for Glenside Flood
7Control Project Phase II in Cheltenham
8Township

 

9Project Allocation

2,500,000

10(Base Project Allocation - $2,500,000)

 

11(C) Acquisition, construction,
12infrastructure and other related costs
13for Carlisle Road Detention Basin
14Project in Springfield Township

 

15Project Allocation

741,000

16(Base Project Allocation - $741,000)

 

17(vii) Philadelphia County

 

18(A) Acquisition, construction,
19infrastructure, redevelopment,
20creation of green space and other
21related costs to mitigate flooding
22through the Carpenter Green Project in
23City of Philadelphia

 

24Project Allocation

250,000

25(Base Project Allocation - $250,000)

 

26Section 8. Itemization of Keystone Recreation, Park and
27Conservation Fund.

28Projects in the category of public improvement projects to be
29constructed by the Department of Conservation and Natural
30Resources, its successors or assigns, and to be financed by

1current revenues of the Keystone Recreation, Park and
2Conservation Fund are hereby itemized, together with their
3respective estimated costs, as follows:

4 

5Project

Total Project

Allocation

6(1) Department of Conservation and Natural
7Resources

 

8(i) Bald Eagle State Park <-Forest

 

9(A) Rehabilitate Mid State Trail Tunnel

 

10Project Allocation

1,600,000

11(Base Project Allocation - $1,600,000)

 

12(B) Repave Poe Valley Road and Millhiem-
13Siglerville Pike

 

14Project Allocation

500,000

15(Base Project Allocation - $500,000)

 

16(C) Replace main waterline within park<-

 

17Project Allocation

500,000

18(Base Project Allocation - $500,000)

 

<-19(ii) Bald Eagle State Park

 

20(A) Replace main waterline within park

 

21Project Allocation

500,000

22(Base Project Allocation - $500,000)

 

23(B) Rehabilitate Environmental Learning
24Center Building

 

25Project Allocation

250,000

26(Base Project Allocation - $250,000)

 

27(iii) Black Moshannon State Park

 

28(A) Rehabilitate park shooting range

 

29Project Allocation

400,000

30(Base Project Allocation - $400,000)

 

1(ii) <-(iv) Buchanan State Park

 

2(A) Construct resource management center,
3including infrastructure

 

4Project Allocation

4,865,000

5(Base Project Allocation - $4,865,000)

 

6(B) Replace Chaneysville Maintenance
7Building

 

8Project Allocation

750,000

9(Base Project Allocation - $750,000)

 

10(iii) <-(v) Caledonia State Park

 

11(A) Rehabilitate campgrounds, including
12infrastructure

 

13Project Allocation

2,500,000

14(Base Project Allocation - $2,500,000)

 

15(iv) <-(vi) Canoe Creek State Park

 

16(A) Rehabilitate sewage treatment plant

 

17Project Allocation

500,000

18(Base Project Allocation - $500,000)

 

19(v) <-(vii) Codorus State Park

 

20(A) Replace main boat launch, band shell
21area and comfort station, including
22infrastructure

 

23Project Allocation

450,000

24(Base Project Allocation - $450,000)

 

<-25(viii) Cook Forest State Park

 

26(A) Remove UST and install AST
27Maintenance system

 

28Project Allocation

200,000

29(Base Project Allocation - $200,000

 

30(vi) <-(ix) Delaware Canal State Park

 

1(A) Replace Lower Limeport Bridge No.2682

 

2Project Allocation

400,000

3(Base Project Allocation - $400,000)

 

4(B) Replace Smithtown Bridge No.3517

 

5Project Allocation

400,000

6(Base Project Allocation - $400,000)

 

7(C) Provide for repairs to Cuttalossa
8culvert

 

9Project Allocation

750,000

10(Base Project Allocation - $750,000)

 

11(vii) <-(x) Elk State Forest

 

12(A) Repair HVAC system for district
13office, including infrastructure and
14pipe repair

 

15Project Allocation

250,000

16(Base Project Allocation - $250,000)

 

17(viii) <-(xi) Forbes State Forest

 

18(A) Construct office addition to Negro
19Mountain Maintenance Complex

 

20Project Allocation

500,000

21(Base Project Allocation - $500,000)

 

<-22(xii) Forbes State Park

 

23(A) Construct pole building for storage

 

24Project Allocation

600,000

25(Base Project Allocation - $600,000

 

26(xiii) Gallitzan State Park

 

27(A) Remediate park skeet range

 

28Project Allocation

200,000

29(Base Project Allocation - $200,000

 

30(ix) <-(xiv) Greenwood Furnace State Park

 

1(A) Rehabilitate maintenance building

 

2Project Allocation

550,000

3(Base Project Allocation - $550,000)

 

<-4(xv) Hills Creek State Park

 

5(A) Replace culvert at Main Park Road

 

6Project Allocation

250,000

7(Base Project Allocation - $250,000

 

8(x) <-(xvi) Keystone State Park

 

9(A) Provide for connection to municipal
10sewage system

 

11Project Allocation

300,000

12(Base Project Allocation - $300,000)

 

13(xi) <-(xvii) Lackawanna State Forest

 

14(A) Renovate park office and foyer

 

15Project Allocation<-

750,000

<-16Project Allocation

1,300,000

17(Base Project Allocation - $750,000 
18$<-1,300,000)

<-

19(B) Remove Olyphant Dam No.2

 

20Project Allocation

800,000

21(Base Project Allocation - $800,000)

 

22(xii) <-(xviii) Little Buffalo State Park

 

23(A) Replace campground shower house

 

24Project Allocation

500,000

25(Base Project Allocation - $500,000)

 

<-26(xix) Michaux State Forest

 

27(A) Rehabilitate target range at Long
28Pine Run Reservoir

 

29Project Allocation

300,000

30(Base Project Allocation - $300,000)

 

1(xiii) <-(xx) Moraine State Park

 

2(A) Rehabilitate sewage system at
3Pleasant Valley

 

4Project Allocation

500,000

5(Base Project Allocation - $500,000)

 

<-6(xxi) Park Region 3

 

7(A) Replace HVAC and ADA upgrades at
8Regional Office

 

9Project Allocation

275,000

10(Base Project Allocation - $275,000)

 

11(xxii) Pymatuning State Park

 

12(A) Rehabilitate water system at
13Jamestown Cabins

 

14Project Allocation

300,000

15(Base Project Allocation - $300,000)

 

16(xiv) <-(xxiii) Rothrock State Forest

 

17(A) Rehabilitate district office parking
18lots, including drainage and paving

 

19Project Allocation

250,000

20(Base Project Allocation - $250,000)

 

<-21(B) Construct pole building at Greenwood
22Headquarters

 

23Project Allocation

250,000

24(Base Project Allocation - $250,000)

 

25(xxiv) Sproul State Forest

 

26(A) Investigate geothermal heating system

 

27Project Allocation

200,000

28(Base Project Allocation - $200,000)

 

29(xv) <-(xxv) Tuscarora State Forest

 

30(A) Rehabilitate Bryner Maintenance

 

1headquarters, including infrastructure

 

2Project Allocation

1,200,000

3(Base Project Allocation - $1,200,000)

 

<-4(B) Construct East Licking Creek pole
5building

 

6Project Allocation

250,000

7(Base Project Allocation - $250,000)

 

8(xvi) <-(xxvi) Weiser State Forest

 

9(A) Rehabilitate Haldeman Maintenance
10Headquarters, including infrastructure

 

11Project Allocation

1,200,000

12(Base Project Allocation - $1,200,000)

 

13Section 9. Itemization of Environmental Stewardship Fund.

14The individual projects to be developed by the Department of
15Conservation and Natural Resources, its successors or assigns,
16and to be financed from current revenues of the Environmental
17Stewardship Fund are hereby itemized, together with their
18respective estimated costs, as follows:

19 

20Project

Total Project

Allocation

21(1) Department of Conservation and Natural
22Resources

 

<-23(i) Bald Eagle State Forest

 

24(A) Construct a new pole building at the
25Bald Eagle Maintenance Headquarters

 

26Project Allocation

350,000

27(Base Project Allocation - $350,000)

 

28(i) <-(i.1) Buchanan State Forest

 

29(A) Rehabilitate Siding <-Sidling Hill
30maintenance shop, including

 

1infrastructure

 

2Project Allocation

750,000

3(Base Project Allocation - $750,000)

 

<-4(B) Construct a water treatment and
5storage unit

 

6Project Allocation

200,000

7(Base Project Allocation - $200,000

 

8(ii) Colonel Denning State Park

 

9(A) Rehabilitate comfort station with new
10shower house and sewage infrastructure

 

11Project Allocation

1,000,000

12(Base Project Allocation - $1,000,000)

 

<-13(ii.1) Delaware Canal State Park

 

14(A) Replace Smithtown Bridge #4

 

15Project Allocation

400,000

16(Base Project Allocation - $400,000)

 

17(B) Replace Redfield Road Bridge

 

18Project Allocation

450,000

19(Base Project Allocation - $450,000)

 

20(iii) Frances Slocum State Park

 

21(A) Rehabilitate sewage connection to
22DAMA and demolish current STP

 

23Project Allocation

1,050,000

24(Base Project Allocation - $1,050,000)

 

<-25(B) Rehabilitate the Environmental
26Education Center

 

27Project Allocation

1,600,000

28(Base Project Allocation - $1,600,000)

 

29(iv) Greenwood Furnace State Park

 

30(A) Replace water line from reservoir to

 

1mansion

 

2Project Allocation

400,000

3(Base Project Allocation - $400,000)

 

4(v) Laurel Hill State Park

 

5(A) Rehabilitate STP and dredge lagoons

 

6Project Allocation

540,000

7(Base Project Allocation - $540,000)

 

<-8(v.1) Lehigh Gorge State Park

 

9(A) Repair the Glen Onoko Bridge Bearings

 

10Project Allocation

575,000

11(Base Project Allocation - $575,000)

 

12(vi) Moshannon State Forest

 

13(A) Construct groomer storage building at

14Black Mountain headquarters

 

15Project Allocation

250,000

16(Base Project Allocation - $250,000)

 

<-17(vi.1) Nockamixon State Park

 

18(A) Rehabilitate and pave various
19roadways within the park

 

20Project Allocation

1,500,000

21(Base Project Allocation - $1,500,000)

 

22(vii) Park Region No.2

 

23(A) Scour and protect four bridges within
24park region

 

25Project Allocation

600,000

26(Base Project Allocation - $600,000)

 

27(viii) Prince Gallitzin State Park

 

28(A) Rehabilitate parking, including
29paving and drainage improvements

 

30Project Allocation

1,000,000

1(Base Project Allocation - $1,000,000)

 

2(ix) Poe Valley State Park

 

3(A) Replace park office

 

4Project Allocation

750,000

5(Base Project Allocation - $750,000)

 

<-6(ix.1) Presque Isle State Park

 

7(A) Connect Beach No.1 to municipal
8sewage facility

 

9Project Allocation

400,000

10(Base Project Allocation - $400,000)

 

11(ix.2) Reed Gap State Park

 

12(A) Demolish sewage treatment plant and
13construct new system

 

14Project Allocation

375,000

15(Base Project Allocation - $375,000)

 

16(x) Ridley Creek State Park

 

17(A) Construct new equestrian building

 

18Project Allocation

900,000

19(Base Project Allocation - $900,000)

 

20(xi) Rothrock State Forest

 

21(A) Rehabilitate pole building at Whipple
22Dam

 

23Project Allocation

250,000

24(Base Project Allocation - $250,000)

 

25(xii) Sproul State Forest

 

26(A) C<-onstruct pole building at district 
27office Snow Shoe<-

 

28Project Allocation

250,000

29(Base Project Allocation - $250,000)

 

<-30(xiii) Susquehannock State Park

 

1(A) Pave main park road

 

2Project Allocation

250,000

3(Base Project Allocation - $250,000)

 

4Section 10. Itemization of State forestry bridge projects.

5Projects in the category of State forestry bridge projects to
6be constructed by the Department of Conservation and Natural
7Resources, its successors or assigns, and to be financed by oil
8company franchise tax revenues under 75 Pa.C.S. § 9502(a)(2)(iv)
9(related to imposition of tax) are hereby itemized, together
10with their respective estimated costs, as follows:

11 

12Project

Total Project

Allocation

13(1) Cameron County Cambria County

<-

14(i) Gallitzan State Forest

<-

15(A) Replace Babcock Creek Road Bridge
16over Babcock Creek

 

17Project Allocation

200,000

18(Base Project Allocation - $200,000)

 

19(1.1) Cameron County

 

20(i) Elk State Forest

 

21(A) Replace Fee Hollow Road structure
22over West Cowley Run

 

23Project Allocation

200,000

24(Base Project Allocation - $200,000)

 

25(B) Replace Vantassel culvert

 

26Project Allocation

200,000

27(Base Project Allocation - $200,000)

 

<-28(C) Replace Bridge No.13-9008 at East
29Hicks Run over Sand Spring Run

 

30Project Allocation

200,000

1(Base Project Allocation - $200,000)

 

2(D) Replace Dents Run Road over Dents Run

 

3Project Allocation

200,000

4(Base Project Allocation - $200,000)

 

5(E) Replace Fee Hollow over West Cowley
6Run

 

7Project Allocation

200,000

8(Base Project Allocation - $200,000)

 

9(F) Replace Hicks Run Road over Beldin
10Hollow

 

11Project Allocation

200,000

12(Base Project Allocation - $200,000)

 

13(G) Replace Bridge No.13-9016, No.13-9019
14and No.13-9021 on Naval Hollow Road
15over Naval Hollow Creek

 

16Project Allocation

600,000

17(Base Project Allocation - $600,000)

 

18(2) Clearfield County

 

19(i) Moshannon State Forest

 

20(A) Replace Ames Road structure over Deer
21Creek

 

22Project Allocation

200,000

23(Base Project Allocation - $200,000)

 

24(B) Replace Medix Grade Road structure
25over tributary of Medix Run

 

26Project Allocation

200,000

27(Base Project Allocation - $200,000)

 

<-28(C) Replace Bridge No.09-0038 on Gordon
29Road over Whitney Run

 

30Project Allocation

200,000

1(Base Project Allocation - $200,000)

 

2(D) Replace Bridge No.09-0039 on Harley
3Dean Road over Laurel Run

 

4Project Allocation

200,000

5(Base Project Allocation - $200,000)

 

6(E) Replace Bridge No.09-0040 on
7Blackwell Road over Tributary of
8Laural Run

 

9Project Allocation

200,000

10(Base Project Allocation - $200,000)

 

11(ii) Sproul State Forest

 

12(A) Replace Barney Ridge Road over
13Barneys Run

 

14Project Allocation

200,000

15(Base Project Allocation - $200,000)

 

16(B) Replace Bridge A, No.10-0069 on Cole
17Run Road over Camp Run

 

18Project Allocation

200,000

19(Base Project Allocation - $200,000)

 

20(C) Replace Bridge B, No.10-0068 on Cole
21Run Road

 

22Project Allocation

200,000

23(Base Project Allocation - $200,000)

 

24(3) Clinton County

 

25(i) Sproul State Park

 

26(A) Replace Graham Road structure over
27Ferney Run

 

28Project Allocation

200,000

29(Base Project Allocation - $200,000)

 

30(4) Franklin County

 

1(i) Michaux State Forest

 

2(A) Replace box culvert along Milesburn
3Road over Kato Run

 

4Project Allocation

200,000

5(Base Project Allocation - $200,000)

 

6(5) Huntingdon County

 

7(i) Rothrock State Forest

 

8(A) Replace Laurel Run Road structure
9over tributary of Galbraith Gap Run

 

10Project Allocation

200,000

11(Base Project Allocation - $200,000)

 

<-12(B) Replace two box culverts at Boal Gap
13Road and Krise Valley Road over Boal
14Gap Run

 

15Project Allocation

400,000

16(Base Project Allocation - $400,000)

 

17(C) Replace Bridge No.05-0029 on Spruce
18Mountain Road over unnamed tributary

 

19Project Allocation

200,000

20(Base Project Allocation - $200,000)

 

21(D) Replace Bridge No.05-0030 on Cinklin
22Road over Lingle Creek

 

23Project Allocation

200,000

24(Base Project Allocation - $200,000)

 

25(6) Lycoming County

 

26(i) Tiadaghton State Forest

 

27(A) Replace Morris Run structure over
28Slate Run 0046

 

29Project Allocation

350,000

30(Base Project Allocation - $350,000)

 

<-1(B) Replace Browns Run Road over Browns
2Run

 

3Project Allocation

200,000

4(Base Project Allocation - $200,000)

 

5(7) Monroe County

 

6(i) Delaware State Forest

 

7(A) Replace Bald Hill Road structure over
8unnamed creek

 

9Project Allocation

200,000

10(Base Project Allocation - $200,000)

 

<-11(B) Replace two culverts near Five Mile
12Meadow Road

 

13Project Allocation

400,000

14(Base Project Allocation - $400,000)

 

15(8) Perry County

 

16(i) Tuscarora State Forest

 

17(A) Replace Spectacle Gap Road structure
18over Spectacle Run and replace Stelzer
19Road structure over Black Log Creek

 

20Project Allocation<-

300,000

21(Base Project Allocation - $300,000)

 

22(9) Tioga County

 

23(i) Tioga State Forest

 

24(A) Replace Painter Leetonia Road
25structure over Four Mile Run

 

26Project Allocation

320,000

27(Base Project Allocation - $320,000)

 

<-28Project Allocation

350,000

29(Base Project Allocation - $350,000)

 

30(9) Potter County

 

1(i) Susquehannock State Forest

 

2(A) Replace Bridge No.15-9000 on Lebo
3Road over Big Spring Branch of Lebo
4Road

 

5Project Allocation

200,000

6(Base Project Allocation - $200,000)

 

7(10) Schuylkill County

 

8(i) Weiser State Forest

 

9(A) Construct south branch trail bridge
10over south branch of Roaring Creek

 

11Project Allocation

300,000

12(Base Project Allocation - $300,000)

 

13(11) Somerset County

 

14(i) Forbes State Forest

 

15(A) Replace bridge No.1 and culvert over
16Lick Hollow

 

17Project Allocation

200,000

18(Base Project Allocation - $200,000)

 

19(12) Sullivan County

 

20(i) Loyalsock State Forest

 

21(A) Replace Walker Road structure over
22east branch of Mill Creek

 

23Project Allocation

200,000

24(Base Project Allocation - $200,000)

 

25(B) Replace Rock Run Road structure over
26Loyalsock Creek

 

27Project Allocation

300,000

28(Base Project Allocation - $300,000)

 

<-29(C) Rehabilitate McCarty Road over
30Dutters Run

 

1Project Allocation

200,000

2(Base Project Allocation - $200,000)

 

3(13) Tioga County

 

4(i) Tioga State Forest

 

5(A) Replace Painter Leetonia Road
6Structure over Four Mile Run

 

7Project Allocation

320,000

8(Base Project Allocation - $320,000)

 

9(14) Union County

 

10(i) Bald Eagle State Forest

 

11(A) Replace Bridge No.07-0001 at Havice
12Valley Road over Havice Creek

 

13Project Allocation

320,000

14(Base Project Allocation - $320,000)

 

15(B) Replace Bridge No.07-0025 at Swift
16Run Road over Swift Run

 

17Project Allocation

320,000

18(Base Project Allocation - $320,000)

 

19(C) Replace Bridge No.07-9006 at Engle
20Road over White Deer Creek

 

21Project Allocation

200,000

22(Base Project Allocation - $200,000)

 

23Section 11. Itemization of Motor License Fund projects.

24Projects in the category of Motor License Fund projects to be
25constructed by the Department of Transportation, its successors
26or assigns, and to be financed by current revenues are hereby
27itemized, together with their respective estimated costs, as
28follows:

29 

30Project

Total Project

Allocation

1(1) Adams County

 

2(i) Adams County Maintenance Facility

 

3(A) Construct new storage building,
4including site purchase, development,
5design and site work

 

6Project Allocation

3,000,000

7(Base Project Allocation - $1,750,000)

 

8(Land Allocation - $750,000)

 

9(Design & Contingencies - $500,000)

 

10(2) Allegheny County

 

11(i) Allegheny County Maintenance Facility

 

12(A) Construct new storage building,
13including site purchase, development,
14design and site work

 

15Project Allocation

3,000,000

16(Base Project Allocation - $2,400,000)

 

17(Land Allocation - $100,000)

 

18(Design & Contingencies - $500,000)

 

19(ii) Allegheny County Maintenance Garage

 

20(A) Develop new stockpile, including site
21purchase, development, design and
22construction of all required buildings

 

23Project Allocation

13,000,000

24(Base Project Allocation -
25$10,500,000)

 

26(Land Allocation - $2,000,000)

 

27(Design & Contingencies - $500,000)

 

28(iii) Allegheny County Stockpile Facility

 

29(A) Construct two new salt storage
30buildings

 

1Project Allocation

1,000,000

2(Base Project Allocation - $900,000)

 

3(Design & Contingencies - $100,000)

 

4(3) Armstrong County

 

5(i) Armstrong County Maintenance Facility

 

6(A) Develop new stockpile, including site
7purchase, development, design and
8construction of all required buildings

 

9Project Allocation

3,000,000

10(Base Project Allocation - $1,750,000)

 

11(Land Allocation - $750,000)

 

12(Design & Contingencies - $500,000)

 

13(4) Beaver County

 

14(i) Beaver County Maintenance Facility

 

15(A) Construct new storage building,
16including site purchase, development,
17design and site work

 

18Project Allocation

3,000,000

19(Base Project Allocation - $2,400,000)

 

20(Land Allocation - $100,000)

 

21(Design & Contingencies - $500,000)

 

22(ii) Beaver County Maintenance Garage

 

23(A) Construct new stockpile, including
24site purchase, development, design and
25construction of all required buildings

 

26Project Allocation

2,200,000

27(Base Project Allocation - $2,000,000)

 

28(Land Allocation - $100,000)

 

29(Design & Contingencies - $100,000)

 

30(5) Bedford County

 

1(i) Bedford County Maintenance Facility

 

2(A) Construct new stockpile, including
3site purchase, development, design and
4construction of all required buildings

 

5Project Allocation

3,000,000

6(Base Project Allocation - $2,400,000)

 

7(Land Allocation - $100,000)

 

8(Design & Contingencies - $500,000)

 

9(ii) Bedford County Stockpile Facility

 

10(A) Construct two new salt storage
11buildings

 

12Project Allocation

1,000,000

13(Base Project Allocation - $900,000)

 

14(Design & Contingencies - $100,000)

 

15(6) Blair County

 

16(i) Blair County Stockpile Facility

 

17(A) Construct two new salt storage
18buildings

 

19Project Allocation

1,000,000

20(Base Project Allocation - $900,000)

 

21(Design & Contingencies - $100,000)

 

22(7) Berks County

 

23(i) Berks County Maintenance Facility

 

24(A) Construct new storage building,
25including site purchase, development,
26design and site work

 

27Project Allocation

3,000,000

28(Base Project Allocation - $1,750,000)

 

29(Land Allocation - $750,000)

 

30(Design & Contingencies - $500,000)

 

1(8) Bucks County

 

2(i) Bucks County Maintenance Facility

 

3(A) Construct new storage building,
4including site purchase, development,
5design and site work

 

6Project Allocation

3,000,000

7(Base Project Allocation - $1,750,000)

 

8(Land Allocation - $750,000)

 

9(Design & Contingencies - $500,000)

 

10(9) Butler County

 

11(i) Butler County Maintenance Facility

 

12(A) Develop new stockpile, including site
13purchase, development, design and
14construction of all required buildings

 

15Project Allocation

3,000,000

16(Base Project Allocation - $1,750,000)

 

17(Land Allocation - $750,000)

 

18(Design & Contingencies - $500,000)

 

19(ii) Butler County Stockpile Facility

 

20(A) Construct new salt storage building

 

21Project Allocation

500,000

22(Base Project Allocation - $450,000)

 

23(Design & Contingencies - $50,000)

 

24(10) Cambria County

 

25(i) Cambria County Maintenance Garage

 

26(A) Construct new stockpile, including
27site purchase, development, design and
28construction of all required buildings

 

29Project Allocation

15,000,000

30(Base Project Allocation -

 

1$12,500,000)

 

2(Land Allocation - $2,000,000)

 

3(Design & Contingencies - $500,000)

 

4(11) Cameron County

 

5(i) Cameron County Bridgebeam Facility

 

6(A) Renovate and expand current facility,
7including upgrading building systems,
8roof repair and energy-efficiency
9measures

 

10Project Allocation

3,000,000

11(Base Project Allocation - $2,750,000)

 

12(Design & Contingencies - $250,000)

 

13(ii) Cameron County Maintenance Facility

 

14(A) Construct new storage building,
15including site purchase, development,
16design and site work

 

17Project Allocation

3,000,000

18(Base Project Allocation - $1,750,000)

 

19(Land Allocation - $750,000)

 

20(Design & Contingencies - $500,000)

 

21(iii) Cameron County Stockpile Facility

 

22(A) Construct new salt storage building

 

23Project Allocation

500,000

24(Base Project Allocation - $450,000)

 

25(Design & Contingencies - $50,000)

 

26(12) Carbon County

 

27(i) Carbon County Maintenance Facility

 

28(A) Construct new storage building,
29including site purchase, development,
30design and site work

 

1Project Allocation

3,000,000

2(Base Project Allocation - $1,750,000)

 

3(Land Allocation - $750,000)

 

4(Design & Contingencies - $500,000)

 

5(13) Centre County

 

6(i) Centre County Maintenance Facility

 

7(A) Construct new storage building,
8including site purchase, development,
9design and site work

 

10Project Allocation

3,000,000

11(Base Project Allocation - $1,750,000)

 

12(Land Allocation - $750,000)

 

13(Design & Contingencies - $500,000)

 

14(ii) Centre County Stockpile Facility

 

15(A) Construct new salt storage building

 

16Project Allocation

500,000

17(Base Project Allocation - $450,000)

 

18(Design & Contingencies - $50,000)

 

19(14) Chester County

 

20(i) Chester County Maintenance Facility

 

21(A) Construct new storage building,
22including site purchase, development,
23design and site work

 

24Project Allocation

3,000,000

25(Base Project Allocation - $1,750,000)

 

26(Land Allocation - $750,000)

 

27(Design & Contingencies - $500,000)

 

28(15) Clarion County

 

29(i) Clarion County Maintenance Garage

 

30(A) Construct new stockpile, including

 

1site purchase, development, design and
2construction of all required buildings

 

3Project Allocation

15,000,000

4(Base Project Allocation -
5$12,500,000)

 

6(Land Allocation - $2,000,000)

 

7(Design & Contingencies - $500,000)

 

8(ii) Clarion County Maintenance Facility

 

9(A) Construct new stockpile, including
10site purchase, development, design and
11construction of all required buildings

 

12Project Allocation

3,000,000

13(Base Project Allocation - $1,750,000)

 

14(Land Allocation - $750,000)

 

15(Design & Contingencies - $500,000)

 

16(iii) Clarion County Stockpile Facility

 

17(A) Construct new salt storage building

 

18Project Allocation

500,000

19(Base Project Allocation - $450,000)

 

20(Design & Contingencies - $50,000)

 

21(16) Clinton County

 

22(i) Clinton County Maintenance Facility

 

23(A) Renovate and expand storage building,
24including building systems, roof
25replacement and energy-efficiency
26measures

 

27Project Allocation

2,500,000

28(Base Project Allocation - $2,000,000)

 

29(Design & Contingencies - $500,000)

 

30(B) Construct new storage building,

 

1including site purchase, development,
2design and site work

 

3Project Allocation

3,000,000

4(Base Project Allocation - $1,750,000)

 

5(Land Allocation - $750,000)

 

6(Design & Contingencies - $500,000)

 

7(17) Columbia County

 

8(i) Columbia County Maintenance Facility

 

9(A) Develop new stockpile, including site
10purchase, development, design and
11construction of all required buildings

 

12Project Allocation

3,000,000

13(Base Project Allocation - $1,750,000)

 

14(Land Allocation - $750,000)

 

15(Design & Contingencies - $500,000)

 

16(18) Crawford County

 

17(i) Crawford County Bridgebeam Facility

 

18(A) Renovate and expand current facility,
19including upgrading building systems,
20roof repair and energy-efficiency
21measures

 

22Project Allocation

3,000,000

23(Base Project Allocation - $2,750,000)

 

24(Design & Contingencies - $250,000)

 

25(ii) Crawford County Maintenance Facility

 

26(A) Construct new storage building,
27including site purchase, development,
28design and site work

 

29Project Allocation

3,000,000

30(Base Project Allocation - $1,750,000)

 

1(Land Allocation - $750,000)

 

2(Design & Contingencies - $500,000)

 

3(iii) Crawford County Stockpile Facility

 

4(A) Construct new salt storage building

 

5Project Allocation

500,000

6(Base Project Allocation - $450,000)

 

7(Design & Contingencies - $50,000)

 

8(19) Cumberland County

 

9(i) Cumberland County Maintenance Facility

 

10(A) Construct new storage building,
11including site purchase, development,
12design and site work

 

13Project Allocation

3,000,000

14(Base Project Allocation - $1,750,000)

 

15(Land Allocation - $750,000)

 

16(Design & Contingencies - $500,000)

 

17(20) Dauphin County

 

18(i) Dauphin County Maintenance Facility

 

19(A) Construct new storage building,
20including site purchase, development,
21design and site work

 

22Project Allocation

3,000,000

23(Base Project Allocation - $1,750,000)

 

24(Land Allocation - $750,000)

 

25(Design & Contingencies - $500,000)

 

26(21) Delaware County

 

27(i) Delaware County Maintenance Facility

 

28(A) Construct new storage building,
29including site purchase, development,
30design and site work

 

1Project Allocation

3,000,000

2(Base Project Allocation - $1,750,000)

 

3(Land Allocation - $750,000)

 

4(Design & Contingencies - $500,000)

 

5(22) Elk County

 

6(i) Elk County Maintenance Garage

 

7(A) Renovate and expand storage building,
8including upgrading building systems,
9roof replacement and energy-efficiency
10measures

 

11Project Allocation

2,500,000

12(Base Project Allocation - $2,000,000)

 

13(Design & Contingencies - $500,000)

 

14(ii) Elk County Maintenance Facility

 

15(A) Develop new stockpile, including site
16purchase, development, design and
17construction of all required buildings

 

18Project Allocation

3,000,000

19(Base Project Allocation - $1,750,000)

 

20(Land Allocation - $750,000)

 

21(Design & Contingencies - $500,000)

 

22(23) Erie County

 

23(i) Erie County Maintenance Garage

 

24(A) Construct new storage building,
25including site purchase, development,
26design and site work

 

27Project Allocation

15,000,000

28(Base Project Allocation -
29$12,500,000)

 

30(Land Allocation - $2,000,000)

 

1(Design & Contingencies - $500,000)

 

2(ii) Erie County Stockpile Facility

 

3(A) Construct new salt storage building

 

4Project Allocation

500,000

5(Base Project Allocation - $450,000)

 

6(Design & Contingencies - $50,000)

 

7(24) Forest County

 

8(i) Forest County Maintenance Facility

 

9(A) Construct new storage building,
10including site purchase, development,
11design and site work

 

12Project Allocation

3,000,000

13(Base Project Allocation - $1,750,000)

 

14(Land Allocation - $750,000)

 

15(Design & Contingencies - $500,000)

 

16(25) Franklin County

 

17(i) Franklin County Maintenance Facility

 

18(A) Construct new storage building,
19including site purchase, development,
20design and site work

 

21Project Allocation

3,000,000

22(Base Project Allocation - $1,750,000)

 

23(Land Allocation - $750,000)

 

24(Design & Contingencies - $500,000)

 

25(26) Fulton County

 

26(i) Fulton County Maintenance Facility

 

27(A) Construct new storage building,
28including site purchase, development,
29design and site work

 

30Project Allocation

3,000,000

1(Base Project Allocation - $2,400,000)

 

2(Land Allocation - $100,000)

 

3(Design & Contingencies - $500,000)

 

4(ii) Fulton County Maintenance Garage

 

5(A) Develop new stockpile, including site
6purchase, development, design and
7construction of all required buildings

 

8Project Allocation

16,000,000

9(Base Project Allocation -
10$13,500,000)

 

11(Land Allocation - $2,000,000)

 

12(Design & Contingencies - $500,000)

 

13(iii) Fulton County Stockpile Facility

 

14(A) Construct two new salt storage
15buildings

 

16Project Allocation

1,000,000

17(Base Project Allocation - $900,000)

 

18(Design & Contingencies - $100,000)

 

19(27) Greene County

 

20(i) Greene County Maintenance Facility

 

21(A) Construct new storage building,
22including site purchase, development,
23design and site work

 

24Project Allocation

3,000,000

25(Base Project Allocation - $2,400,000)

 

26(Land Allocation - $100,000)

 

27(Design & Contingencies - $500,000)

 

28(ii) Green County Maintenance Garage

 

29(A) Construct new stockpile, including
30site purchase, development, design and

 

1construction of all required buildings

 

2Project Allocation

15,000,000

3(Base Project Allocation -
4$12,500,000)

 

5(Land Allocation - $2,000,000)

 

6(Design & Contingencies - $500,000)

 

7(iii) Greene County Stockpile Facility

 

8(A) Construct two new salt storage
9buildings

 

10Project Allocation

1,000,000

11(Base Project Allocation - $900,000)

 

12(Design & Contingencies - $100,000)

 

13(28) Huntingdon County

 

14(i) Huntingdon County Maintenance Facility

 

15(A) Construct new storage building,
16including site purchase, development,
17design and site work

 

18Project Allocation

3,000,000

19(Base Project Allocation - $2,400,000)

 

20(Land Allocation - $100,000)

 

21(Design & Contingencies - $500,000)

 

22(29) Indiana County

 

23(i) Indiana County Maintenance Garage

 

24(A) Develop new stockpile, including site
25purchase, development, design and
26construction of all required buildings

 

27Project Allocation

15,000,000

28(Base Project Allocation -
29$12,500,000)

 

30(Land Allocation - $2,000,000)

 

1(Design & Contingencies - $500,000)

 

2(ii) Indiana County Stockpile Facility

 

3(A) Construct new salt storage building

 

4Project Allocation

500,000

5(Base Project Allocation - $450,000)

 

6(Design & Contingencies - $50,000)

 

7(30) Jefferson County

 

8(i) Jefferson County Maintenance Facility

 

9(A) Construct new stockpile, including
10site purchase, development, design and
11construction of all required buildings

 

12Project Allocation

3,000,000

13(Base Project Allocation - $1,750,000)

 

14(Land Allocation - $750,000)

 

15(Design & Contingencies - $500,000)

 

16(ii) Jefferson County Maintenance Garage

 

17(A) Construct new stockpile, including
18site purchase, development, design and

19construction of all required buildings

 

20Project Allocation

15,000,000

21(Base Project Allocation -
22$12,500,000)

 

23(Land Allocation - $2,000,000)

 

24(Design & Contingencies - $500,000)

 

25(iii) Jefferson County Stockpile Facility

 

26(A) Construct new salt storage building

 

27Project Allocation

500,000

28(Base Project Allocation - $450,000)

 

29(Design & Contingencies - $50,000)

 

30(31) Juniata County

 

1(i) Juniata County Maintenance Facility

 

2(A) Construct new stockpile, including
3site purchase, development, design and
4construction of all required buildings

 

5Project Allocation

3,000,000

6(Base Project Allocation - $1,750,000)

 

7(Land Allocation - $750,000)

 

8(Design & Contingencies - $500,000)

 

9(ii) Juniata County Maintenance Garage

 

10(A) Renovate and expand storage building,
11including building systems, roof
12replacement and energy-efficiency
13measures

 

14Project Allocation

15,000,000

15(Base Project Allocation -
16$12,500,000)

 

17(Land Allocation - $2,000,000)

 

18(Design & Contingencies - $500,000)

 

19(iii) Juniata County Stockpile Facility

 

20(A) Construct new salt storage building

 

21Project Allocation

500,000

22(Base Project Allocation - $450,000)

 

23(Design & Contingencies - $50,000)

 

24(32) Lackawanna County

 

25(i) Lackawanna County Maintenance Facility

 

26(A) Construct new storage building,
27including site purchase, development,
28design and site work

 

29Project Allocation

3,000,000

30(Base Project Allocation - $1,750,000)

 

1(Land Allocation - $750,000)

 

2(Design & Contingencies - $500,000)

 

3(33) Lancaster County

 

4(i) Lancaster County Maintenance Facility

 

5(A) Construct new storage building,
6including site purchase, development,
7design and site work

 

8Project Allocation

3,000,000

9(Base Project Allocation - $1,750,000)

 

10(Land Allocation - $750,000)

 

11(Design & Contingencies - $500,000)

 

12(34) Lawrence County

 

13(i) Lawrence County Stockpile Facility

 

14(A) Construct two new salt storage
15buildings

 

16Project Allocation

1,000,000

17(Base Project Allocation - $900,000)

 

18(Design & Contingencies - $100,000)

 

19(35) Lebanon County

 

20(i) Lebanon County Maintenance Facility

 

21(A) Construct new storage building,
22including site purchase, development,
23design and site work

 

24Project Allocation

3,000,000

25(Base Project Allocation - $1,750,000)

 

26(Land Allocation - $750,000)

 

27(Design & Contingencies - $500,000)

 

28(36) Lehigh County

 

29(i) Lehigh County Maintenance Facility

 

30(A) Construct new storage building,

 

1including site purchase, development,
2design and site work

 

3Project Allocation

3,000,000

4(Base Project Allocation - $1,750,000)

 

5(Land Allocation - $750,000)

 

6(Design & Contingencies - $500,000)

 

7(37) Lycoming County

 

8(i) Lycoming County Maintenance Facility

 

9(A) Construct new stockpile, including
10site purchase, development, design and
11construction of all required buildings

 

12Project Allocation

3,000,000

13(Base Project Allocation - $1,750,000)

 

14(Land Allocation - $750,000)

 

15(Design & Contingencies - $500,000)

 

16(38) McKean County

 

17(i) McKean County Maintenance Facility

 

18(A) Construct new storage building,
19including site purchase, development,
20design and site work

 

21Project Allocation

3,000,000

22(Base Project Allocation - $1,750,000)

 

23(Land Allocation - $750,000)

 

24(Design & Contingencies - $500,000)

 

25(ii) McKean County Maintenance Garage

 

26(A) Construct new stockpile, including
27site purchase, development, design and
28construction of all required buildings

 

29Project Allocation

14,000,000

30(Base Project Allocation -

 

1$12,500,000)

 

2(Land Allocation - $1,000,000)

 

3(Design & Contingencies - $500,000)

 

4(39) Mercer County

 

5(i) Mercer County Bridgebeam Facility

 

6(A) Renovate and expand current facility,
7including upgrading building systems,
8roof repair and energy-efficiency
9measures

 

10Project Allocation

3,000,000

11(Base Project Allocation - $2,750,000)

 

12(Design & Contingencies - $250,000)

 

13(40) Mifflin County

 

14(i) Mifflin County Maintenance Facility

 

15(A) Construct new stockpile, including
16site purchase, development, design and
17construction of all required buildings

 

18Project Allocation

3,000,000

19(Base Project Allocation - $1,750,000)

 

20(Land Allocation - $750,000)

 

21(Design & Contingencies - $500,000)

 

22(ii) Mifflin County Stockpile Facility

 

23(A) Construct new salt storage building

 

24Project Allocation

500,000

25(Base Project Allocation - $450,000)

 

26(Design & Contingencies - $50,000)

 

27(41) Monroe County

 

28(i) Monroe County Maintenance Facility

 

29(A) Construct new storage building,
30including site purchase, development,

 

1design and site work

 

2Project Allocation

3,000,000

3(Base Project Allocation - $1,750,000)

 

4(Land Allocation - $750,000)

 

5(Design & Contingencies - $500,000)

 

6(42) Montgomery County

 

7(i) Montgomery County 6-0 Parking Garage

 

8(A) Renovate and repair existing parking
9garage

 

10Project Allocation

4,000,000

11(Base Project Allocation - $3,600,000)

 

12(Design & Contingencies - $400,000)

 

13(ii) Montgomery County 6-0 District Office

 

14(A) Install standby generator capable of
15running entire facility

 

16Project Allocation

2,500,000

17(Base Project Allocation - $2,250,000)

 

18(Design & Contingencies - $250,000)

 

19(iii) Montgomery County Maintenance Facility

 

20(A) Construct new storage building,
21including site purchase, development,
22design and site work

 

23Project Allocation

3,000,000

24(Base Project Allocation - $1,750,000)

 

25(Land Allocation - $750,000)

 

26(Design & Contingencies - $500,000)

 

27(43) Montour County

 

28(i) Montour County Maintenance Facility

 

29(A) Construct new stockpile, including
30site purchase, development, design and

 

1construction of all required buildings

 

2Project Allocation

3,000,000

3(Base Project Allocation - $1,750,000)

 

4(Land Allocation - $750,000)

 

5(Design & Contingencies - $500,000)

 

6(44) Northampton County

 

7(i) Northampton County Maintenance Facility

 

8(A) Construct new storage building,
9including site purchase, development,
10design and site work

 

11Project Allocation

3,000,000

12(Base Project Allocation - $1,750,000)

 

13(Land Allocation - $750,000)

 

14(Design & Contingencies - $500,000)

 

15(45) Northumberland County

 

16(i) Northumberland County Bridgebeam Facility

 

17(A) Renovate and expand current facility,
18including upgrading building systems,
19roof repair and energy-efficiency
20measures

 

21Project Allocation

3,000,000

22(Base Project Allocation - $2,750,000)

 

23(Design & Contingencies - $250,000)

 

24(ii) Northumberland County Maintenance
25Facility

 

26(A) Construct new stockpile, including
27site purchase, development, design and
28construction of all required buildings

 

29Project Allocation

3,000,000

30(Base Project Allocation - $1,750,000)

 

1(Land Allocation - $750,000)

 

2(Design & Contingencies - $500,000)

 

3(46) Perry County

 

4(i) Perry County Maintenance Facility

 

5(A) Construct new storage building,
6including site purchase, development,
7design and site work

 

8Project Allocation

3,000,000

9(Base Project Allocation - $1,750,000)

 

10(Land Allocation - $750,000)

 

11(Design & Contingencies - $500,000)

 

12(47) Philadelphia County

 

13(i) Philadelphia County Maintenance Facility

 

14(A) Construct new storage building,
15including site purchase, development,
16design and site work

 

17Project Allocation

3,000,000

18(Base Project Allocation - $1,750,000)

 

19(Land Allocation - $750,000)

 

20(Design & Contingencies - $500,000)

 

21(48) Pike County

 

22(i) Pike County Maintenance Facility

 

23(A) Construct new storage building,
24including site purchase, development,
25design and site work

 

26Project Allocation

3,000,000

27(Base Project Allocation - $1,750,000)

 

28(Land Allocation - $750,000)

 

29(Design & Contingencies - $500,000)

 

30(49) Potter County

 

1(i) Potter County Maintenance Facility

 

2(A) Construct new stockpile, including
3site purchase, development, design and
4construction of all required buildings

 

5Project Allocation

3,000,000

6(Base Project Allocation - $1,750,000)

 

7(Land Allocation - $750,000)

 

8(Design & Contingencies - $500,000)

 

9(50) Schuylkill County

 

10(i) Schuylkill County Maintenance Facility

 

11(A) Construct new storage building,
12including site purchase, development,
13design and site work

 

14Project Allocation

3,000,000

15(Base Project Allocation - $1,750,000)

 

16(Land Allocation - $750,000)

 

17(Design & Contingencies - $500,000)

 

18(51) Snyder County

 

19(i) Snyder County Maintenance Garage

 

20(A) Renovate and expand storage building,
21including upgrading building systems,
22roof repair and energy-efficiency
23measures

 

24Project Allocation

2,500,000

25(Base Project Allocation - $2,000,000)

 

26(Design & Contingencies - $500,000)

 

27(ii) Snyder County Maintenance Facility

 

28(A) Construct new stockpile, including
29site purchase, development, design and
30construction of all required buildings

 

1Project Allocation

3,000,000

2(Base Project Allocation - $1,750,000)

 

3(Land Allocation - $750,000)

 

4(Design & Contingencies - $500,000)

 

5(52) Somerset County

 

6(i) Somerset County Maintenance Facility

 

7(A) Construct new storage facility,
8including site purchase, development,
9design and site work

 

10Project Allocation

2,200,000

11(Base Project Allocation - $1,600,000)

 

12(Land Allocation - $100,000)

 

13(Design & Contingencies - $500,000)

 

14(ii) Somerset County Maintenance Garage

 

15(A) Construct new stockpile, including
16site purchase, development, design and
17construction of all required buildings

 

18Project Allocation

15,000,000

19(Base Project Allocation -
20$12,500,000)

 

21(Land Allocation - $2,000,000)

 

22(Design & Contingencies - $500,000)

 

23(iii) Somerset County Stockpile Facility

 

24(A) Construct two new salt storage
25buildings

 

26Project Allocation

1,000,000

27(Base Project Allocation - $900,000)

 

28(Land Allocation - $100,000)

 

29(53) Sullivan County

 

30(i) Sullivan County Maintenance Facility

 

1(A) Construct new stockpile, including
2site purchase, development, design and
3construction of all required buildings

 

4Project Allocation

3,000,000

5(Base Project Allocation - $1,750,000)

 

6(Land Allocation - $750,000)

 

7(Design & Contingencies - $500,000)

 

8(54) Susquehanna County

 

9(i) Susquehanna County Maintenance Facility

 

10(A) Construct new storage building,
11including site purchase, development,
12design and site work

 

13Project Allocation

3,100,000

14(Base Project Allocation - $1,750,000)

 

15(Land Allocation - $750,000)

 

16(Design & Contingencies - $600,000)

 

17(B) Construct new storage building,
18including site purchase, development,
19design and site work

 

20Project Allocation

1,500,000

21(Base Project Allocation - $975,000)

 

22(Land Allocation - $300,000)

 

23(Design & Contingencies - $225,000)

 

24(55) Tioga County

 

25(i) Tioga County Maintenance Facility

 

26(A) Construct new stockpile, including
27site purchase, development, design and
28construction of all required buildings

 

29Project Allocation

3,000,000

30(Base Project Allocation - $1,750,000)

 

1(Land Allocation - $750,000)

 

2(Design & Contingencies - $500,000)

 

3(56) Union County

 

4(i) Union County Maintenance Facility

 

5(A) Construct new stockpile, including
6site purchase, development, design and
7construction of all required buildings

 

8Project Allocation

3,000,000

9(Base Project Allocation - $1,750,000)

 

10(Land Allocation - $750,000)

 

11(Design & Contingencies - $500,000)

 

12(57) Venango County

 

13(i) Venango County Maintenance Facility

 

14(A) Construct new storage building,
15including site purchase, development,
16design and site work

 

17Project Allocation

3,000,000

18(Base Project Allocation - $1,750,000)

 

19(Land Allocation - $750,000)

 

20(Design & Contingencies - $500,000)

 

21(58) Warren County

 

22(i) Warren County Bridgebeam Facility

 

23(A) Renovate and expand current facility,
24including upgrading building systems,
25roof repair and energy-efficiency
26measures

 

27Project Allocation

3,000,000

28(Base Project Allocation - $2,750,000)

 

29(Design & Contingencies - $250,000)

 

30(ii) Warren County Maintenance Facility

 

1(A) Construct new storage building,
2including site purchase, development,
3design and site work

 

4Project Allocation

3,000,000

5(Base Project Allocation - $1,750,000)

 

6(Land Allocation - $750,000)

 

7(Design & Contingencies - $500,000)

 

8(iii) Warren County Maintenance Garage

 

9(A) Construct new stockpile, including
10site purchase, development, design and
11construction of all required buildings

 

12Project Allocation

15,000,000

13(Base Project Allocation -
14$12,500,000)

 

15(Land Allocation - $2,000,000)

 

16(Design & Contingencies - $500,000)

 

17(59) Washington County

 

18(i) Washington County Stockpile Facility

 

19(A) Construct two new salt storage
20buildings

 

21Project Allocation

1,000,000

22(Base Project Allocation - $900,000)

 

23(Design & Contingencies - $100,000)

 

24(60) Wayne County

 

25(i) Wayne County Maintenance Facility

 

26(A) Construct new storage building,
27including site purchase, development,
28design and site work

 

29Project Allocation

3,000,000

30(Base Project Allocation - $1,750,000)

 

1(Land Allocation - $750,000)

 

2(Design & Contingencies - $500,000)

 

3(ii) Wayne County Maintenance Garage

 

4(A) Resurface garage floors and perform
5any necessary repairs

 

6Project Allocation

500,000

7(Base Project Allocation - $450,000)

 

8(Design & Contingencies - $50,000)

 

9(61) Westmoreland County

 

10(i) Westmoreland County Maintenance Facility

 

11(A) Construct new salt storage building

 

12Project Allocation

6,000,000

13(Base Project Allocation - $5,500,000)

 

14(Design & Contingencies - $500,000)

 

15(B) Construct new storage building,
16including site purchase, development,
17design and site work

 

18Project Allocation

3,000,000

19(Base Project Allocation - $2,400,000)

 

20(Land Allocation - $100,000)

 

21(Design & Contingencies - $500,000)

 

22(ii) Westmoreland County Stockpile Facility

 

23(A) Construct two new salt storage
24buildings

 

25Project Allocation

1,000,000

26(Base Project Allocation - $900,000)

 

27(Design & Contingencies - $100,000)

 

28(62) Wyoming County

 

29(i) Wyoming County Maintenance Facility

 

30(A) Construct new storage building,

 

1including site purchase, development,
2design and site work

 

3Project Allocation

3,000,000

4(Base Project Allocation - $1,750,000)

 

5(Land Allocation - $750,000)

 

6(Design & Contingencies - $500,000)

 

7(63) York County

 

8(i) York County Maintenance Facility

 

9(A) Construct new storage building,
10including site purchase, development,
11design and site work

 

12Project Allocation

3,000,000

13(Base Project Allocation - $1,750,000)

 

14(Land Allocation - $750,000)

 

15(Design & Contingencies - $500,000)

 

16(64) Various Counties

 

17(i) Bridgebeam Facilities

 

18(A) Design and construct three new
19bridgebeam fabrication facilities

 

20Project Allocation

9,000,000

21(Base Project Allocation - $8,100,000)

 

22(Design & Contingencies - $900,000)

 

23Section 11.1. Itemization of Pennsylvania Fish and Boat<-
24Commission capital projects.

25The individual capital projects in the category of public
26improvements projects to be acquired or developed by the
27Pennsylvania Fish and Boat Commission and to be financed by the
28incurring of debt or by the current revenues of the Fish Fund
29and the Boat Fund pursuant to executive authorizations are
30hereby itemized, together with their respective estimated costs,

1as follows:

2 

3Project

Total Project
Allocation

4(1)  Pennsylvania Fish and Boat Commission

 

5(i)  Berks County

 

6(A)  Design, permit, construct and
7mitigate EPA contamination site

 

8Project Allocation

500,000

9(Base Project Allocation - $500,000)

 

10(ii)  Fulton County

 

11(A)  Design, permit and construct a
12rehabilitated dam to meet current dam
13safety requirements

 

14Project Allocation

2,562,000

15(Base Project Allocation - $2,562,000)

 

16(iii) Snyder County

 

17(A)  Design, permit and construct a
18rehabilitated dam to meet current dam
19safety requirements

 

20Project Allocation

3,037,000

21(Base Project Allocation - $3,037,000)

 

22(iv) Somerset County

 

23(A)  Design, permit and construct a
24rehabilitated dam to meet current dam
25safety requirements

 

26Project Allocation

2,160,000

27(Base Project Allocation - $2,160,000)

 

28(v) Wayne County

 

29(A)  Design, permit and construct a
30rehabilitated dam to meet current dam

 

1safety requirements

 

2Project Allocation

3,317,000

3(Base Project Allocation - $3,317,000)

 

4(B)  Design, permit and construct a
5rehabilitated dam to meet current dam
6safety requirements

 

7Project Allocation

200,000

8(Base Project Allocation - $200,000)

 

9(C)  Design, permit and construct a
10rehabilitated dam to meet current dam
11safety requirements

 

12Project Allocation

3,317,000

13(Base Project Allocation - $3,317,000)

 

14Section 12. Debt authorization.

15(a) Public improvements.--The Governor, Auditor General and
16State Treasurer are hereby authorized and directed to borrow
17from time to time in addition to any authorization heretofore or
18hereafter enacted, on the credit of the Commonwealth, subject to
19the limitations provided in the current capital budget, money
20not exceeding in the aggregate the sum of $565,191,000<- 
21$949,966,000.<-

22(b) Furniture and equipment.--The Governor, Auditor General
23and State Treasurer are hereby authorized and directed to borrow
24from time to time in addition to any authorization heretofore or
25hereafter enacted on the credit of the Commonwealth, subject to
26the limitations provided in the current capital budget, money
27not exceeding in the aggregate the sum of $1,600,000<- $19,600,000
28as may be found necessary to carry out the acquisition and
29construction of the public improvement projects consisting of
30the acquisition of original movable furniture and equipment

1specifically itemized in the capital budget.

2(c) Transportation assistance.--The Governor, Auditor
3General and State Treasurer are hereby authorized and directed
4to borrow from time to time in addition to any authorization
5heretofore or hereafter enacted, on the credit of the
6Commonwealth, subject to the limitations provided in the current
7capital budget, money not exceeding in the aggregate the sum of
8$451,893,000 $554,771,000 as may be found necessary to carry out<-
9the acquisition and construction of the transportation
10assistance projects specifically itemized in a capital budget.

11(d) Redevelopment assistance.--Subject to the limitation in
12section 317(b) of the act of February 9, 1999 (P.L.1, No.1),
13known as the Capital Facilities Debt Enabling Act, the Governor,
14Auditor General and State Treasurer are hereby authorized and
15directed to borrow from time to time in addition to any
16authorization heretofore or hereafter enacted, on the credit of
17the Commonwealth, subject to the limitations provided in the
18current capital budget, money not exceeding in the aggregate the
19sum of $787,027,000 $1,512,030,000 as may be found necessary to<-
20carry out the redevelopment assistance capital projects
21specifically itemized in a capital budget.

22(e) Flood control.--The Governor, Auditor General and State
23Treasurer are hereby authorized and directed to borrow from time
24to time in addition to an authorization heretofore or hereafter
25enacted, on the credit of the Commonwealth, subject to the
26limitations provided in the current capital budget, money not
27exceeding in the aggregate the sum of $48,205,000 $62,502,000 as<-
28may be found necessary to carry out the acquisition and
29construction of the flood control projects specifically itemized
30in a capital budget.

1(f) Pennsylvania Fish and Boat Commission projects.--The<-
2Governor, Auditor General and State Treasurer are hereby
3authorized and directed to borrow from time to time in addition
4to any authorization heretofore or hereafter enacted, on the
5credit of the Commonwealth, subject to the limitations provided
6in the current capital budget, money not exceeding in the
7aggregate the sum of $15,093,000 as may be found necessary to
8carry out the acquisition and construction of the Pennsylvania
9Fish and Boat Commission projects specifically itemized in a
10capital budget.

11Section 13. Issue of bonds.

12The indebtedness authorized in this act shall be incurred
13from time to time and shall be evidenced by one or more series
14of general obligation bonds of the Commonwealth in such
15aggregate principal amount for each series as the Governor, the
16Auditor General and the State Treasurer shall determine, but the
17latest stated maturity date shall not exceed estimated useful
18life of the projects being financed as stated in section 14.

19Section 14. Estimated useful life and term of debt.

20(a) Estimated useful life.--The General Assembly states that
21the estimated useful life of the public improvement projects
22itemized in this act is as follows:

23(1) Public improvement projects, 30 years.

24(2) Furniture and equipment, 10 years.

25(3) Transportation assistance projects:

26(i) Rolling stock, 15 years.

27(ii) Passenger buses, 12 years.

28(iii) Furniture and equipment, 10 years.

29(iv) All others, 30 years.

30(b) Term of debt.--The maximum term of the debt authorized

1to be incurred under this act is 30 years.

2Section 15. Appropriations.

3(a) Public improvements.--The net proceeds of the sale of
4the obligations authorized in this act are hereby appropriated
5from the Capital Facilities Fund to the Department of General
6Services in the maximum amount of $565,191,000 $949,966,000<- to
7be used by it exclusively to defray the financial cost of the
8public improvement projects specifically itemized in a capital
9budget. After reserving or paying the expenses of the sale of
10the obligation, the State Treasurer shall pay to the Department
11of General Services the moneys as required and certified by it
12to be legally due payable.

13(b) Furniture and equipment.--The net proceeds of the sale
14of the obligations authorized in this act are hereby
15appropriated from the Capital Facilities Fund to the Department
16of General Services in the maximum amount of $1,600,000<-
17$19,600,000<- to be used by it exclusively to defray the financial
18cost of the public improvement projects consisting of the
19acquisition of original movable furniture and equipment
20specifically itemized in a capital budget. After reserving or
21paying the expenses of the sale of the obligation, the State
22Treasurer shall pay to the Department of General Services the
23moneys as required and certified by it to be legally due and
24payable.

25(c) Transportation assistance.--The net proceeds of the sale
26of the obligations authorized in this act are hereby
27appropriated from the Capital Facilities Fund to the Department
28of Transportation in the maximum amount of $451,893,000<-
29$554,771,000<- to be used by it exclusively to defray the
30financial cost of the transportation assistance projects

1specifically itemized in a capital budget. After reserving or
2paying the expenses of the sale of the obligation, the State
3Treasurer shall pay to the Department of Transportation the
4moneys as required and certified by it to be legally due and
5payable.

6(d) Redevelopment assistance.--The net proceeds of the sale
7of the obligations authorized in this act are hereby
8appropriated from the Capital Facilities Fund to the Department
9of Community and Economic Development in the maximum amount of
10$787,027,000<- $1,512,030,000 to be used by it exclusively to
11defray the financial cost of the redevelopment assistance
12capital projects specifically itemized in a capital budget.
13After reserving or paying the expenses of the sale of the
14obligation, the State Treasurer shall pay to the Department of
15Community and Economic Development the moneys as required and
16certified by it to be legally due and payable.

17(e) Flood control.--The net proceeds of the sale of the
18obligations authorized in this act are hereby appropriated from
19the Capital Facilities Fund to the Department of Environmental
20Protection in the maximum amount of $48,205,000 $62,502,000 to<-
21be used by it exclusively to defray the financial cost of the
22flood control projects specifically itemized in a capital
23budget. After reserving or paying the expenses of the sale of
24the obligation, the State Treasurer shall pay to the Department
25of Environmental Protection the moneys as required and certified
26by it to be legally due and payable.

27Section 16. Federal funds.

28(a) Projects itemized in this act.--All moneys received from
29the Federal Government for the projects specifically itemized in
30this act are also hereby appropriated for those projects.

1(b) Projects not requiring itemization.--Department of
2Military and Veterans Affairs construction projects which are
3totally federally funded and to be administered by the
4Department of General Services are hereby authorized.

5Section 17. Editorial changes.

6In editing and preparing this act for printing following the
7final enactment, the Legislative Reference Bureau shall insert
8or revise letters or numbers for projects where the letters or
9numbers are missing or require revision. The Legislative
10Reference Bureau shall also revise the total monetary amounts
11for the total authorization, debt authorization, appropriations
12and department totals as necessary to agree with the total
13monetary amounts of the projects.

14Section 18. Effective date.

15This act shall take effect immediately.