PRINTER'S NO.  3191

  

THE GENERAL ASSEMBLY OF PENNSYLVANIA

  

HOUSE BILL

 

No.

2242

Session of

2012

  

  

INTRODUCED BY BAKER, PICKETT, GEIST, BOBACK, GINGRICH, MAJOR AND WATSON, MARCH 12, 2012

  

  

REFERRED TO COMMITTEE ON TRANSPORTATION, MARCH 12, 2012  

  

  

  

AN ACT

  

1

Providing for the highway capital budget project itemization for

2

flood-damaged highways to be financed from revenue from the

3

Motor License Fund.

4

The General Assembly of the Commonwealth of Pennsylvania

5

hereby enacts as follows:

6

Section 1.  Short title.

7

This act shall be known and may be cited as the Capital

8

Budget Act of 2011 for Highways Damaged by Hurricane Irene and

9

Tropical Storm Lee.

10

Section 2.  Authorization.

11

The total authorization for the capital projects in the

12

category of highway projects itemized in sections 4 through 70

13

and to be constructed by the Department of Transportation, its

14

successors or assigns, and to be financed from current revenue

15

of the Motor License Fund shall be $66,783,000.

16

Section 3.  Itemization of highway projects.

17

Additional capital projects in the category of public highway

18

projects to be constructed by the Department of Transportation,

 


1

its successors or assigns, and to be financed from current

2

revenue of the Motor License Fund are hereby itemized, together

3

with their respective estimated financial costs, in the

4

following sections.

5

Section 4.  Adams County (Reserved).

  

  

6

7

Section 5.  Allegheny County

(Reserved).

  

  

8

9

Section 6.  Armstrong County

(Reserved).

  

  

10

Section 7.  Beaver County (Reserved).

  

  

11

Section 8.  Bedford County (Reserved).

  

  

12

Section 9.  Berks County (Reserved).

  

  

13

Section 10.  Blair County (Reserved).

  

  

14

Section 11.  Bradford County.

Local

State

15

(a)  Local Highways (Reserved)

  

  

16

(b)  State Highways

  

  

17

18

19

20

(1)  SR 0220, Monroe Borough and

Albany, Athens, Ulster and

North Towanda Townships,

Roadway, Shoulder Repair

  

  

21

Project Allocation

  

113,000

22

(Base Project Allocation - $113,000)

  

  

23

24

25

(2)  SR 2015, Albany and Terry

Townships, Roadway, Shoulder

Repair

  

  

26

Project Allocation

  

139,000

27

(Base Project Allocation - $139,000)

  

  

28

29

30

(3)  SR 3009, Burlington Borough

and Burlington, Monroe and

Towanda Townships, Roadway,

  

  

- 2 -

 


1

Shoulder Repair

2

Project Allocation

  

107,000

3

(Base Project Allocation - $107,000)

  

  

4

5

(4)  SR 0154, Canton Township,

Roadway, Shoulder Repair

  

  

6

Project Allocation

  

181,000

7

(Base Project Allocation - $181,000)

  

  

8

9

(5)  SR 3003, Canton Township,

Roadway, Shoulder Repair

  

  

10

Project Allocation

  

356,000

11

(Base Project Allocation - $356,000)

  

  

12

13

(6)  SR 3013, Franklin Township,

Roadway Reconstruction

  

  

14

Project Allocation

  

125,000

15

(Base Project Allocation - $125,000)

  

  

16

17

18

(7)  SR 0414, Franklin, Canton,

Leroy and Monroe Townships,

Roadway, Shoulder Repair

  

  

19

Project Allocation

  

141,000

20

(Base Project Allocation - $141,000)

  

  

21

22

23

24

(8)  SR 3017, Granville,

Franklin and West Burlington

Townships, Roadway, Shoulder

Repair

  

  

25

Project Allocation

  

222,000

26

(Base Project Allocation - $222,000)

  

  

27

28

(9)  SR 0414, Monroe Township,

Roadway Reconstruction

  

  

29

Project Allocation

  

482,000

30

(Base Project Allocation - $482,000)

  

  

- 3 -

 


1

2

(10)  SR 1051, Orwell Township,

Roadway Reconstruction

  

  

3

Project Allocation

  

410,000

4

(Base Project Allocation - $410,000)

  

  

5

6

(11)  SR 1055, Rome Township,

Roadway Reconstruction

  

  

7

Project Allocation

  

250,000

8

(Base Project Allocation - $250,000)

  

  

9

10

11

(12)  SR 4017, Springfield

Township, Roadway, Shoulder

Repair

  

  

12

Project Allocation

  

176,000

13

(Base Project Allocation - $176,000)

  

  

14

15

16

17

(13)  SR 4013, Springfield, West

Burlington, Ridgebury and

Smithfield Townships,

Roadway, Shoulder Repair

  

  

18

Project Allocation

  

205,000

19

(Base Project Allocation - $205,000)

  

  

20

21

22

23

(14)  SR 0187, Terry, Wilmot,

Windham, Asylum, Wysox, Rome

and Orwell Townships,

Roadway, Shoulder Repair

  

  

24

Project Allocation

  

427,000

25

(Base Project Allocation - $427,000)

  

  

26

27

(15)  SR 0006, Troy Township,

Roadway Reconstruction

  

  

28

Project Allocation

  

555,000

29

(Base Project Allocation - $555,000)

  

  

30

(16)  SR 1014, Tuscarora

  

  

- 4 -

 


1

2

Township, Roadway, Shoulder

Repair

3

Project Allocation

  

134,000

4

(Base Project Allocation - $134,000)

  

  

5

6

(17)  SR 1049, Warren Township,

Roadway Reconstruction

  

  

7

Project Allocation

  

263,000

8

(Base Project Allocation - $263,000)

  

  

9

10

11

12

13

14

(18)  SR 0006, West Burlington,

North Towanda, Columbia,

Troy, Burlington, Wysox,

Standing Stone and Tuscarora

Townships, Roadway, Shoulder

Repair

  

  

15

Project Allocation

  

566,000

16

(Base Project Allocation - $566,000)

  

  

17

18

19

(19)  SR 1017, Wyalusing and

Herrick Townships, Roadway,

Shoulder Repair

  

  

20

Project Allocation

  

137,000

21

(Base Project Allocation - $137,000)

  

  

22

23

(20)  SR 0006, Wysox Township,

Roadway Reconstruction

  

  

24

Project Allocation

  

343,000

25

(Base Project Allocation - $343,000)

  

  

26

27

(21)  SR 0187, Wysox Township,

Roadway Reconstruction

  

  

28

Project Allocation

  

405,000

29

(Base Project Allocation - $405,000)

  

  

30

(22)  SR 1033, Wysox Township,

  

  

- 5 -

 


1

Roadway, Shoulder Repair

2

Project Allocation

  

206,000

3

(Base Project Allocation - $206,000)

  

  

4

5

6

(23)  Various Projects, Various

Municipalities, Regional

Incurred Costs

  

  

7

Project Allocation

  

1,451,000

8

9

(Base Project Allocation -

$1,451,000)

  

  

10

Section 12.  Bucks County.

Local

State

11

(a)  Local Highways (Reserved)

  

  

12

(b)  State Highways

  

  

13

14

(1)  SR 0263, Solebury Township,

Roadway Issues

  

  

15

Project Allocation

  

1,003,000

16

17

(Base Project Allocation -

$1,003,000)

  

  

18

Section 13.  Butler County (Reserved).

  

  

19

Section 14.  Cambria County (Reserved).

  

  

20

Section 15.  Cameron County (Reserved).

  

  

21

Section 16.  Carbon County (Reserved).

  

  

22

Section 17.  Centre County (Reserved).

  

  

23

Section 18.  Chester County.

Local

State

24

(a)  Local Highways (Reserved)

  

  

25

(b)  State Highways

  

  

26

27

(1)  SR 3026, London Grove

Township, Restoration

  

  

28

Project Allocation

  

250,000

29

(Base Project Allocation - $250,000)

  

  

30

(2)  SR 0422, Tredyffrin

  

  

- 6 -

 


1

Township, Restoration

2

Project Allocation

  

7,040,000

3

4

(Base Project Allocation -

$7,040,000)

  

  

5

6

7

(3)  Various Projects, Various

Municipalities, Reconstruct

Roadway at Various Locations

  

  

8

Project Allocation

  

175,000

9

(Base Project Allocation - $175,000)

  

  

10

Section 19.  Clarion County (Reserved).

  

  

11

12

Section 20.  Clearfield County

(Reserved).

  

  

13

Section 21.  Clinton County (Reserved).

  

  

14

Section 22.  Columbia County.

Local

State

15

(a)  Local Highways

  

  

16

17

18

(1)  T-449, Bloom Street,

Hemlock Township, Approach

Roadway to Bridge Washout

  

  

19

Project Allocation

113,000

  

20

(Base Project Allocation-$113,000)

  

  

21

(b)  State Highways

  

  

22

23

24

25

26

27

28

(1)  SR 4049, Catawissa, Fishing

Creek, Hemlock, Main,

Montour, Mt. Pleasant, North

Centre and Sugarloaf

Townships and Town of

Bloomsburg, Roadway, Shoulder

Repair

  

  

29

Project Allocation

  

149,000

30

(Base Project Allocation - $149,000)

  

  

- 7 -

 


1

2

3

4

(2)  SR 0042, Catawissa, Locust,

Montour and Hemlock

Townships, Roadway, Shoulder

Repair

  

  

5

Project Allocation

  

459,000

6

(Base Project Allocation - $459,000)

  

  

7

8

9

(3)  SR 3003, Cleveland and

Franklin Townships, Roadway,

Shoulder Repair

  

  

10

Project Allocation

  

302,000

11

(Base Project Allocation - $302,000)

  

  

12

13

14

(4)  SR 1020, Fishing Creek

Township, Roadway

Reconstruction

  

  

15

Project Allocation

  

200,000

16

(Base Project Allocation - $200,000)

  

  

17

18

19

20

21

22

23

(5)  SR 0487, Franklin,

Sugarloaf, Orange, Fishing

Creek, Scott, Catawissa and

Benton Townships and

Orangeville and Stillwater

Boroughs, Roadway, Shoulder

Repair

  

  

24

Project Allocation

  

1,131,000

25

26

(Base Project Allocation -

$1,131,000)

  

  

27

28

29

(6)  SR 4008, Mt. Pleasant

Township, Roadway

Reconstruction

  

  

30

Project Allocation

  

340,000

- 8 -

 


1

(Base Project Allocation - $340,000)

  

  

2

3

(7)  SR 4034, Orange Township,

Roadway Reconstruction

  

  

4

Project Allocation

  

175,000

5

(Base Project Allocation - $175,000)

  

  

6

7

8

(8)  SR 4020, Orange and Mt.

Pleasant Townships, Roadway,

Shoulder Repair

  

  

9

Project Allocation

  

239,000

10

(Base Project Allocation - $239,000)

  

  

11

12

13

(9)  SR 0011, Town of

Bloomsburg, Roadway

Reconstruction

  

  

14

Project Allocation

  

232,000

15

(Base Project Allocation - $232,000)

  

  

16

17

18

(10)  Various Projects, Various

Municipalities, Regional

Incurred Costs

  

  

19

Project Allocation

  

865,000

20

(Base Project Allocation - $865,000)

  

  

21

22

Section 23.  Crawford County

(Reserved).

  

  

23

24

Section 24.  Cumberland County

(Reserved).

  

  

25

Section 25.  Dauphin County.

Local

State

26

(a)  Local Highways (Reserved)

  

  

27

(b)  State Highways

  

  

28

29

(1)  SR 0230, Londonderry

Township, Roadway Restoration

  

  

30

Project Allocation

  

181,000

- 9 -

 


1

(Base Project Allocation - $181,000)

  

  

2

3

4

(2)  SR 0325, Rush Township,

Stabilize Shoulder,

Embankment, Replace Pipes

  

  

5

Project Allocation

  

200,000

6

(Base Project Allocation - $200,000)

  

  

7

Section 26.  Delaware County.

Local

State

8

(a)  Local Highways (Reserved)

  

  

9

(b)  State Highways

  

  

10

11

12

(1)  SR 3022, Middletown

Township, Reconstruct Roadway

at Various Locations

  

  

13

Project Allocation

  

150,000

14

(Base Project Allocation - $150,000)

  

  

15

16

17

(2)  SR 0252, Newtown Township,

Reconstruct Roadway at

Various Locations

  

  

18

Project Allocation

  

105,000

19

(Base Project Allocation - $105,000)

  

  

20

21

(3)  SR 3026, Upper Darby

Township, Restoration

  

  

22

Project Allocation

  

250,000

23

(Base Project Allocation - $250,000)

  

  

24

Section 27.  Elk County (Reserved).

  

  

25

Section 28.  Erie County (Reserved).

  

  

26

Section 29.  Fayette County (Reserved).

  

  

27

Section 30.  Forest County (Reserved).

  

  

28

29

Section 31.  Franklin County

(Reserved).

  

  

30

Section 32.  Fulton County (Reserved).

  

  

- 10 -

 


1

Section 33.  Greene County (Reserved).

  

  

2

3

Section 34.  Huntingdon County

(Reserved).

  

  

4

Section 35.  Indiana County (Reserved).

  

  

5

6

Section 36.  Jefferson County

(Reserved).

  

  

7

Section 37.  Juniata County (Reserved).

  

  

8

9

Section 38.  Lackawanna County

(Reserved).

  

  

10

11

Section 39.  Lancaster County

(Reserved).

  

  

12

13

Section 40.  Lawrence County

(Reserved).

  

  

14

Section 41.  Lebanon County.

Local

State

15

(a)  Local Highways (Reserved)

  

  

16

(b)  State Highways

  

  

17

18

(1)  SR 1011, Bethel Township,

Roadway Restoration

  

  

19

Project Allocation

  

100,000

20

(Base Project Allocation - $100,000)

  

  

21

22

(2)  SR 0934, East Hanover

Township, Roadway Restoration

  

  

23

Project Allocation

  

140,000

24

(Base Project Allocation - $140,000)

  

  

25

26

27

(3)  SR 2019, Jackson Township,

Roadway Reconstruction,

Stream Restoration

  

  

28

Project Allocation

  

593,000

29

(Base Project Allocation - $593,000)

  

  

30

(4)  SR 3025, North Cornwall

  

  

- 11 -

 


1

Township, Roadway Restoration

2

Project Allocation

  

130,000

3

(Base Project Allocation - $130,000)

  

  

4

5

6

(5)  SR 0072, Swatara Township,

Roadway Restoration, Parapet

Repair

  

  

7

Project Allocation

  

253,000

8

(Base Project Allocation - $253,000)

  

  

9

Section 42.  Lehigh County.

Local

State

10

(a)  Local Highways (Reserved)

  

  

11

(b)  State Highways

  

  

12

13

(1)  SR 0078, City of Allentown,

Reconstruction

  

  

14

Project Allocation

  

2,445,000

15

16

(Base Project Allocation -

$2,445,000)

  

  

17

18

19

(2)  SR 1021, South Whitehall

Township, Embankment, Guide

Rail Replacement

  

  

20

Project Allocation

  

479,000

21

(Base Project Allocation - $479,000)

  

  

22

Section 43.  Luzerne County.

Local

State

23

(a)  Local Highways (Reserved)

  

  

24

(b)  State Highways

  

  

25

26

27

(1)  SR 0092, Exeter Borough,

Right Shoulder Undermine,

Erosion

  

  

28

Project Allocation

  

165,000

29

(Base Project Allocation - $165,000)

  

  

30

(2)  SR 0092, Exeter Township,

  

  

- 12 -

 


1

2

Right Shoulder Undermine,

Erosion

3

Project Allocation

  

298,000

4

(Base Project Allocation - $298,000)

  

  

5

6

7

8

(3)  SR 0118, Fairmount

Township, Replace WPA

Retaining Wall, Section Loss

into Existing Structure

  

  

9

Project Allocation

  

411,000

10

(Base Project Allocation - $411,000)

  

  

11

12

13

(4)  SR 4013, Fairmount

Township, Reconstruct Roadway

at Various Locations

  

  

14

Project Allocation

  

755,000

15

(Base Project Allocation - $755,000)

  

  

16

17

(5)  SR 4015, Fairmount

Township, Channel Cleaning

  

  

18

Project Allocation

  

149,000

19

(Base Project Allocation - $149,000)

  

  

20

21

22

(6)  SR 4005, Hunlock Township,

Replace Twin Cell Arch

Culvert with Approaches

  

  

23

Project Allocation

  

750,000

24

(Base Project Allocation - $750,000)

  

  

25

26

27

(7)  SR 0029, Jackson and Lake

Townships, Roadway, Stream

Bank Restoration

  

  

28

Project Allocation

  

247,000

29

(Base Project Allocation - $247,000)

  

  

30

(8)  SR 0029, Plymouth Township,

  

  

- 13 -

 


1

2

Reconstruct Roadway at

Various Locations

3

Project Allocation

  

627,000

4

(Base Project Allocation - $627,000)

  

  

5

6

7

(9)  SR 0029, Plymouth and Lake

Townships, Roadway, Stream

Bank Restoration

  

  

8

Project Allocation

  

240,000

9

(Base Project Allocation - $240,000)

  

  

10

11

12

(10)  Various Municipalities,

Reconstruct Roadways at

Various Locations

  

  

13

Project Allocation

  

120,000

14

(Base Project Allocation - $120,000)

  

  

15

Section 44.  Lycoming County.

Local

State

16

(a)  Local Highways (Reserved)

  

  

17

(b)  State Highways

  

  

18

19

(1)  SR 0973, Eldred Township,

Roadway Reconstruction

  

  

20

Project Allocation

  

310,000

21

(Base Project Allocation - $310,000)

  

  

22

23

(2)  SR 1003, Eldred Township,

Roadway Reconstruction

  

  

24

Project Allocation

  

1,086,000

25

26

(Base Project Allocation -

$1,086,000)

  

  

27

28

(3)  SR 1003, Gamble Township,

Roadway Reconstruction

  

  

29

Project Allocation

  

518,000

30

(Base Project Allocation - $518,000)

  

  

- 14 -

 


1

2

(4)  SR 1003, Gamble Township,

Roadway Reconstruction

  

  

3

Project Allocation

  

250,000

4

(Base Project Allocation - $250,000)

  

  

5

6

7

(5)  SR 1006, Lewis, Cascade and

Plunketts Creek Townships,

Roadway, Shoulder Repair

  

  

8

Project Allocation

  

144,000

9

(Base Project Allocation - $144,000)

  

  

10

11

12

(6)  SR 1004, Lewis and Gamble

Townships, Roadway, Shoulder

Repair

  

  

13

Project Allocation

  

394,000

14

(Base Project Allocation - $394,000)

  

  

15

16

17

(7)  SR 2039, Loyalsock

Township, Roadway, Shoulder

Repair

  

  

18

Project Allocation

  

103,000

19

(Base Project Allocation - $103,000)

  

  

20

21

22

(8)  SR 0864, Mill Creek, Upper

Fairfield and Wolf Townships,

Roadway, Shoulder Repair

  

  

23

Project Allocation

  

333,000

24

(Base Project Allocation - $333,000)

  

  

25

26

27

(9)  SR 8034, Montoursville

Borough, Roadway, Shoulder

Repair

  

  

28

Project Allocation

  

206,000

29

(Base Project Allocation - $206,000)

  

  

30

(10)  SR 0442, Muncy Creek,

  

  

- 15 -

 


1

2

3

Moreland and Franklin

Townships, Roadway, Shoulder

Repair

4

Project Allocation

  

552,000

5

(Base Project Allocation - $552,000)

  

  

6

7

8

9

10

(11)  SR 0220, Picture Rocks

Borough, Muncy, Shrewsbury,

Penn, Porter, Piatt, Woodward

and Wolf Townships, Roadway,

Shoulder Repair

  

  

11

Project Allocation

  

170,000

12

(Base Project Allocation - $170,000)

  

  

13

14

15

(12)  SR 0405, Muncy Creek

Township, Roadway, Shoulder

Repair

  

  

16

Project Allocation

  

100,000

17

(Base Project Allocation - $100,000)

  

  

18

19

20

(13)  SR 2055, Muncy Creek

Township, Roadway

Reconstruction

  

  

21

Project Allocation

  

182,000

22

(Base Project Allocation - $182,000)

  

  

23

24

25

(14)  SR 8022, Muncy Creek

Township, Roadway, Shoulder

Repair

  

  

26

Project Allocation

  

100,000

27

(Base Project Allocation - $100,000)

  

  

28

29

30

(15)  SR 1005, Plunketts Creek

Township, Roadway, Shoulder

Repair

  

  

- 16 -

 


1

Project Allocation

  

170,000

2

(Base Project Allocation - $170,000)

  

  

3

4

5

(16)  SR 1005, Plunketts Creek

Township, Roadway

Reconstruction

  

  

6

Project Allocation

  

210,000

7

(Base Project Allocation - $210,000)

  

  

8

9

10

11

(17)  SR 0087, Plunketts Creek,

Fairfield and Upper Fairfield

Townships, Roadway, Shoulder

Repair

  

  

12

Project Allocation

  

658,000

13

(Base Project Allocation - $658,000)

  

  

14

15

16

(18)  SR 2085, Shrewsbury

Township, Roadway, Shoulder

Repair

  

  

17

Project Allocation

  

260,000

18

(Base Project Allocation - $260,000)

  

  

19

20

21

22

(19)  SR 0087, Upper Fairfield

and Plunketts Creek

Townships, Roadway

Reconstruction

  

  

23

Project Allocation

  

4,370,000

24

25

(Base Project Allocation -

$4,370,000)

  

  

26

27

28

(20)  Various Projects, Various

Municipalities, Regional

Incurred Costs

  

  

29

Project Allocation

  

1,015,000

30

(Base Project Allocation -

  

  

- 17 -

 


1

$1,015,000)

2

3

4

5

(21)  Various Projects, Various

Municipalities, Regional

Incurred Costs, PennDOT

District 3-0

  

  

6

Project Allocation

  

500,000

7

(Base Project Allocation - $500,000)

  

  

8

Section 45.  McKean County (Reserved).

  

  

9

Section 46.  Mercer County (Reserved).

  

  

10

Section 47.  Mifflin County (Reserved).

  

  

11

Section 48.  Monroe County (Reserved).

  

  

12

Section 49.  Montgomery County.

Local

State

13

(a)  Local Highways (Reserved)

  

  

14

(b)  State Highways

  

  

15

16

(1)  SR 2017, Upper Dublin

Township, Restoration

  

  

17

Project Allocation

  

200,000

18

(Base Project Allocation - $200,000)

  

  

19

Section 50.  Montour County.

Local

State

20

(a)  Local Highways (Reserved)

  

  

21

(b)  State Highways

  

  

22

23

(1)  SR 2017, Cooper Township,

Roadway, Shoulder Repair

  

  

24

Project Allocation

  

200,000

25

(Base Project Allocation - $200,000)

  

  

26

27

28

(2)  SR 2006, Cooper and Montour

Townships, Roadway, Shoulder

Repair

  

  

29

Project Allocation

  

224,000

30

(Base Project Allocation - $224,000)

  

  

- 18 -

 


1

2

3

4

5

(3)  SR 0054, Limestone,

Anthony, Derry and Valley

Townships and Danville and

Washingtonville Boroughs,

Roadway, Shoulder Repair

  

  

6

Project Allocation

  

233,000

7

(Base Project Allocation - $233,000)

  

  

8

9

10

(4)  Various Projects, Various

Municipalities, Regional

Incurred Costs

  

  

11

Project Allocation

  

257,000

12

(Base Project Allocation - $257,000)

  

  

13

Section 51.  Northampton County.

Local

State

14

(a)  Local Highways (Reserved)

  

  

15

(b)  State Highways

  

  

16

17

18

(1)  SR 1015, Lower Mt. Bethel

Township, Embankment and

Roadway Reconstruction

  

  

19

Project Allocation

  

919,000

20

(Base Project Allocation - $919,000)

  

  

21

22

23

(2)  SR 0611, Williams Township,

Reconstruct Roadway at

Various Locations

  

  

24

Project Allocation

  

1,259,000

25

26

(Base Project Allocation -

$1,259,000)

  

  

27

Section 52.  Northumberland County.

Local

State

28

(a)  Local Highways (Reserved)

  

  

29

(b)  State Highways

  

  

30

(1)  SR 0125, Coal Township,

  

  

- 19 -

 


1

Roadway Reconstruction

2

Project Allocation

  

115,000

3

(Base Project Allocation - $115,000)

  

  

4

5

6

(2)  SR 0225, Lower Mahanoy and

Jackson Townships, Roadway,

Shoulder Repair

  

  

7

Project Allocation

  

161,000

8

(Base Project Allocation - $161,000)

  

  

9

10

11

12

13

14

15

16

(3)  SR 0147, City of Sunbury,

Lower Mahanoy, Jackson, Lower

Augusta, Upper Augusta,

Point, West Chillisquaque and

Turbot Townships and

Northumberland and Milton

Boroughs, Roadway, Shoulder

Repair

  

  

17

Project Allocation

  

188,000

18

(Base Project Allocation - $188,000)

  

  

19

20

21

(4)  SR 4026, Rockefeller and

Shamokin Townships, Roadway,

Shoulder Repair

  

  

22

Project Allocation

  

181,000

23

(Base Project Allocation - $181,000)

  

  

24

25

26

27

(5)  SR 4012, Upper Augusta,

Shamokin and Ralpho Townships

and Snydertown Borough,

Roadway, Shoulder Repair

  

  

28

Project Allocation

  

107,000

29

(Base Project Allocation - $107,000)

  

  

30

(6)  Various Projects, Various

  

  

- 20 -

 


1

2

Municipalities, Regional

Incurred Costs

3

Project Allocation

  

777,000

4

(Base Project Allocation - $777,000)

  

  

5

Section 53.  Perry County (Reserved).

  

  

6

Section 54.  Philadelphia County.

Local

State

7

(a)  Local Highways (Reserved)

  

  

8

(b)  State Highways

  

  

9

10

11

(1)  SR 0076, City of

Philadelphia, Reconstruct

Roadway at Various Locations

  

  

12

Project Allocation

  

129,000

13

(Base Project Allocation - $129,000)

  

  

14

Section 55.  Pike County.

Local

State

15

(a)  Local Highways (Reserved)

  

  

16

(b)  State Highways

  

  

17

18

19

(1)  SR 2002, Delaware Township,

Reconstruct Roadway at

Various Locations

  

  

20

Project Allocation

  

152,000

21

(Base Project Allocation - $152,000)

  

  

22

23

24

(2)  SR 1014, Lackawaxen

Township, Reconstruct Roadway

at Various Locations

  

  

25

Project Allocation

  

317,000

26

(Base Project Allocation - $317,000)

  

  

27

28

29

(3)  SR 1017, Westfall Township,

Reconstruct Roadway at

Various Locations

  

  

30

Project Allocation

  

604,000

- 21 -

 


1

(Base Project Allocation - $604,000)

  

  

2

Section 56.  Potter County (Reserved).

  

  

3

Section 57.  Schuylkill County.

Local

State

4

(a)  Local Highways (Reserved)

  

  

5

(b)  State Highways

  

  

6

7

8

(1)  SR 0081, Pine Grove

Township, Roadway

Reconstruction

  

  

9

Project Allocation

  

356,000

10

(Base Project Allocation - $356,000)

  

  

11

12

13

(2)  SR 0125, Pine Grove

Township, Embankment and

Roadway Reconstruct

  

  

14

Project Allocation

  

584,000

15

(Base Project Allocation - $584,000)

  

  

16

17

18

(3)  SR 0645, Pine Grove

Township, Reconstruct Roadway

at Various Locations

  

  

19

Project Allocation

  

1,076,000

20

21

(Base Project Allocation -

$1,076,000)

  

  

22

23

24

(4)  SR 0125, Tremont Township,

Embankment and Roadway

Reconstruct

  

  

25

Project Allocation

  

484,000

26

(Base Project Allocation - $484,000)

  

  

27

Section 58.  Snyder County (Reserved).

  

  

28

29

Section 59.  Somerset County

(Reserved).

  

  

30

Section 60.  Sullivan County.

Local

State

- 22 -

 


1

(a)  Local Highways (Reserved)

  

  

2

(b)  State Highways

  

  

3

4

5

(1)  SR 2002, Davidson and

Laporte Townships, Roadway,

Shoulder Repair

  

  

6

Project Allocation

  

201,000

7

(Base Project Allocation - $201,000)

  

  

8

9

10

(2)  SR 2002, Davidson and

Laporte Townships, Roadway

Reconstruction

  

  

11

Project Allocation

  

750,000

12

(Base Project Allocation - $750,000)

  

  

13

14

15

(3)  SR 2003, Davidson and

Laporte Townships, Roadway,

Shoulder Repair

  

  

16

Project Allocation

  

163,000

17

(Base Project Allocation - $163,000)

  

  

18

19

20

(4)  SR 2008, Davidson and

Laporte Townships, Roadway

Reconstruction

  

  

21

Project Allocation

  

500,000

22

(Base Project Allocation - $500,000)

  

  

23

24

25

26

(5)  SR 0087, Forks, Colley,

Hillsgrove and Cherry

Townships, Roadway, Shoulder

Repair

  

  

27

Project Allocation

  

622,000

28

(Base Project Allocation - $622,000)

  

  

29

30

(6)  SR 0154, Forks Township,

Forksville Borough, Roadway

  

  

- 23 -

 


1

Reconstruction

2

Project Allocation

  

355,000

3

(Base Project Allocation - $355,000)

  

  

4

5

(7)  SR 2006, Laporte Township,

Roadway, Shoulder Repair

  

  

6

Project Allocation

  

235,000

7

(Base Project Allocation - $235,000)

  

  

8

9

10

11

(8)  SR 0220, Laporte, Davidson

and Cherry Townships and

Dushore Borough, Roadway,

Shoulder Repair

  

  

12

Project Allocation

  

267,000

13

(Base Project Allocation - $267,000)

  

  

14

15

16

17

18

(9)  SR 0154, Laporte,

Shrewsbury, Forks, Elkland

and Fox Townships and

Forksville Borough, Roadway,

Shoulder Repair

  

  

19

Project Allocation

  

178,000

20

(Base Project Allocation - $178,000)

  

  

21

22

23

(10)  SR 3005, Shrewsbury and

Hillsgrove Townships, Roadway

Reconstruction

  

  

24

Project Allocation

  

335,000

25

(Base Project Allocation - $335,000)

  

  

26

27

28

(11)  Various Projects, Various

Municipalities, Regional

Incurred Costs

  

  

29

Project Allocation

  

635,000

30

(Base Project Allocation - $635,000)

  

  

- 24 -

 


1

Section 61.  Susquehanna County.

Local

State

2

(a)  Local Highways (Reserved)

  

  

3

(b)  State Highways

  

  

4

5

6

(1)  SR 0171, Friendsville

Borough, Great Bend Township,

Restoration

  

  

7

Project Allocation

  

182,000

8

(Base Project Allocation - $182,000)

  

  

9

10

(2)  SR 0029, Liberty Township,

Restoration

  

  

11

Project Allocation

  

100,000

12

(Base Project Allocation - $100,000)

  

  

13

Section 62.  Tioga County.

Local

State

14

(a)  Local Highways (Reserved)

  

  

15

(b)  State Highways

  

  

16

17

18

(1)  Various Projects, Various

Municipalities, Regional

Incurred Costs

  

  

19

Project Allocation

  

161,000

20

(Base Project Allocation - $161,000)

  

  

21

Section 63.  Union County.

Local

State

22

(a)  Local Highways (Reserved)

  

  

23

(b)  State Highways

  

  

24

25

26

(1)  Various Projects, Various

Townships, Regional Incurred

Costs

  

  

27

Project Allocation

  

102,000

28

(Base Project Allocation - $102,000)

  

  

29

Section 64.  Venango County (Reserved).

  

  

30

Section 65.  Warren County (Reserved).

  

  

- 25 -

 


1

2

Section 66.  Washington County

(Reserved).

  

  

3

Section 67.  Wayne County (Reserved).

  

  

4

5

Section 68.  Westmoreland County

(Reserved).

  

  

6

Section 69.  Wyoming County.

Local

State

7

(a)  Local Highways (Reserved)

  

  

8

(b)  State Highways

  

  

9

10

11

(1)  SR 3003, Eaton Township,

Reconstruct Roadway at

Various Locations

  

  

12

Project Allocation

  

241,000

13

(Base Project Allocation - $241,000)

  

  

14

15

(2)  SR 3005, Eaton Township,

72-inch Pipe Washout

  

  

16

Project Allocation

  

310,000

17

(Base Project Allocation-$310,000)

  

  

18

19

20

21

(3)  SR 3003, Eaton and

Mehoopany Townships,

Reconstruct Roadway at

Various Locations

  

  

22

Project Allocation

  

195,000

23

(Base Project Allocation - $195,000)

  

  

24

25

26

(4)  SR 0087, Forkston Township,

Reconstruct Roadway at

Various Locations

  

  

27

Project Allocation

  

527,000

28

(Base Project Allocation - $527,000)

  

  

29

30

(5)  SR 3001, Forkston Township,

Reconstruct Roadway at

  

  

- 26 -

 


1

Various Locations

2

Project Allocation

  

6,515,000

3

4

(Base Project Allocation -

$6,515,000)

  

  

5

6

7

(6)  SR 0087, Mehoopany

Township, Reconstruct Roadway

at Various Locations

  

  

8

Project Allocation

  

576,000

9

(Base Project Allocation - $576,000)

  

  

10

11

12

13

(7)  SR 3003, Mehoopany

Township, Pavement, Shoulder,

Embankment Washouts and

Failure

  

  

14

Project Allocation

  

303,000

15

(Base Project Allocation - $303,000)

  

  

16

17

18

(8)  SR 0029, Monroe Township,

Reconstruct Roadway at

Various Locations

  

  

19

Project Allocation

  

636,000

20

(Base Project Allocation - $636,000)

  

  

21

22

23

(9)  SR 0029, Monroe and Lemon

Townships, Various Structural

Damage, Blockages or Washouts

  

  

24

Project Allocation

  

136,000

25

(Base Project Allocation - $136,000)

  

  

26

27

28

(10)  SR 0029, Noxen Township,

Reconstruct Roadway at

Various Locations

  

  

29

Project Allocation

  

300,000

30

(Base Project Allocation - $300,000)

  

  

- 27 -

 


1

2

3

(11)  SR 3002, Noxen Township,

Various Structural Damage,

Blockages or Washouts

  

  

4

Project Allocation

  

2,080,000

5

6

(Base Project Allocation -

$2,080,000)

  

  

7

Section 70.  York County.

Local

State

8

(a)  Local Highways (Reserved)

  

  

9

(b)  State Highways

  

  

10

11

(1)  SR 0030, Jackson Township,

Sinkhole Repairs

  

  

12

Project Allocation

  

300,000

13

(Base Project Allocation - $300,000)

  

  

14

15

16

17

(2)  SR 1019, Mount Wolf and

York Haven Boroughs, Roadway

Restoration, Stream Bank

Stabilization

  

  

18

Project Allocation

  

300,000

19

(Base Project Allocation - $300,000)

  

  

20

21

22

23

(3)  SR 8011, Springettsbury

Township, Slope

Stabilization, Stream

Relocation

  

  

24

Project Allocation

  

682,000

25

(Base Project Allocation - $682,000)

  

  

26

Section 71.  Estimated useful life of projects.

27

The General Assembly states the estimated useful life of the

28

projects itemized is 30 years.

29

Section 72.  Federal funds.

30

All moneys received from the Federal Government for the

- 28 -

 


1

construction of the public highway projects specifically

2

itemized herein are also hereby appropriated for those projects.

3

Section 73.  Construction.

4

Amounts contained in this act for any project shall not

5

supplant or replace any Federal funds authorized by any Federal

6

law or regulation. Funding from this act for any project is

7

available only to the extent that Federal funds are not

8

available for such project.

9

Section 74.  Allocation of funds.

10

Whenever as determined by the Department of Transportation

11

that the full estimated financial costs of the projects itemized

12

in sections 4 through 70 are not necessary for the proper

13

design, acquisition or construction of such projects, the excess

14

funds no longer required may be allocated by the Department of

15

Transportation to increase the estimated costs of any one or

16

more of the projects specifically itemized in a capital budget.

17

Section 75.  Effective date.

18

This act shall take effect immediately.

- 29 -