SENATE AMENDED

 

PRIOR PRINTER'S NOS. 1461, 2050, 2975, 2998

PRINTER'S NO.  3007

  

THE GENERAL ASSEMBLY OF PENNSYLVANIA

  

HOUSE BILL

 

No.

1294

Session of

2011

  

  

INTRODUCED BY GODSHALL, PRESTON, AUMENT, BEAR, BRENNAN, BUXTON, CARROLL, CLYMER, D. COSTA, P. COSTA, CUTLER, DALEY, DAVIDSON, DELOZIER, ELLIS, GRELL, GROVE, HARHART, W. KELLER, KORTZ, KOTIK, MANN, McGEEHAN, MILLARD, NEUMAN, D. O'BRIEN, M. O'BRIEN, PAYNE, PAYTON, PEIFER, PERRY, PYLE, QUIGLEY, READSHAW, REICHLEY, SAINATO, SAYLOR, SCAVELLO, SONNEY, VULAKOVICH, WILLIAMS, KULA, MILLER, GINGRICH, STEPHENS, DEASY, GIBBONS, M. SMITH, GERGELY, CHRISTIANA, KILLION, BRIGGS, STABACK, WAGNER, OBERLANDER, SABATINA, HENNESSEY, LONGIETTI AND EVERETT, APRIL 6, 2011

  

  

AS AMENDED ON SECOND CONSIDERATION, IN SENATE, JANUARY 24, 2012   

  

  

  

AN ACT

  

1

Amending Title 66 (Public Utilities) of the Pennsylvania

<--

2

Consolidated Statutes, further providing for valuation of and

3

return on the property of a public utility; and providing for

4

alternative regulatory mechanisms.

5

Amending Title 66 (Public Utilities) of the Pennsylvania

<--

6

Consolidated Statutes, further providing for Law Bureau,

7

other bureaus, offices and positions, for the burden of

8

proof, for the recovery of the costs of distribution system

9

improvement projects and for civil penalties for violations.

10

The General Assembly of the Commonwealth of Pennsylvania

11

hereby enacts as follows:

12

Section 1.  Section 1311(c) of Title 66 of the Pennsylvania

<--

13

Consolidated Statutes is amended and the section is amended by

14

adding a subsection to read:

15

§ 1311.  Valuation of and return on the property of a public

16

utility.

 


1

* * *

2

(c)  Segregation of property.--When any public utility

3

furnishes more than one of the different types of utility

4

service, the commission shall segregate the property used and

5

useful in furnishing each type of such service, and shall not

6

consider the property of such public utility as a unit in

7

determining the value of the rate base of such public utility

8

for the purpose of fixing rates. A utility that provides water

9

and wastewater service shall be exempt from this subsection and

10

may combine all components of its water and wastewater revenue

11

requirement for the purposes of fixing rates on a consolidated

12

basis.

13

* * *

14

(e)  Definition.--As used in this section, the term "utility

15

that provides both water and wastewater service" shall include

16

subsidiary companies that individually provide water or

17

wastewater service so long as the companies are wholly owned by

18

a common parent company.

19

Section 2.  Title 66 is amended by adding a section to read:

20

§ 1329.  Alternative regulatory mechanisms.

21

(a)  Declaration of policy.--Many fixed utilities and city

22

natural gas distribution operations in this Commonwealth have

23

incurred and will continue to incur significant costs to

24

maintain, enhance  or modernize their physical facilities in

25

order to continue to provide customers with safe and reliable

26

service. Under traditional regulatory mechanisms developed under

27

this title, these utilities and distribution operations

28

experience delay in the recovery of the revenue requirements

29

associated with those costs. The opportunity for more timely

30

recovery of those costs, including the recovery of capital

- 2 -

 


1

costs, including return of and on capital investments, and,

2

where applicable, debt service and debt-service coverage, should

3

encourage investment to replace facilities for continued

4

reliability, should enhance the efficiency of the construction

5

cycle and should attract lower-cost debt, which would reduce the

6

overall cost of these investments and should create jobs in the

7

Commonwealth. Accordingly, it is in the public interest to

8

provide for alternative regulatory mechanisms as set forth under

9

this section.

10

(b)  Authority.--

11

(1)  Notwithstanding any other provision of this title 

12

that would prohibit implementation of this section, upon

13

petition by a fixed utility or a city natural gas

14

distribution operation, filed in its sole discretion, the

15

commission shall have the authority to approve,  modify or

16

reject additional regulatory procedures and mechanisms

17

proposed by a fixed utility or a city natural gas

18

distribution operation to provide for timely recovery of

19

reasonable and  prudent costs incurred for the improvement of

20

physical facilities to maintain safety or reliability.

21

(2)  (i)  The additional procedures and mechanisms under

22

paragraph (1) shall include, but are not limited to:

23

(A)  The use of a fully projected future test

24

year in a general rate proceeding under section

25

1308(d).

26

(B)  An automatic adjustment clause to recover

27

capital costs and  incremental expenditures accounted

28

for as expense of certain projects, as approved by

29

the commission under this section that are placed

30

into service between base rate proceedings.

- 3 -

 


1

(ii)  For purposes of this paragraph, a fully

2

projected future test year shall be the 12-month period

3

beginning with the first month that the new rates could

4

be placed in effect after application of the full

5

suspension period permitted under section 1308(d).

6

(c)  Construction and interpretation.--Except as otherwise

7

expressly provided under this section, nothing under this

8

section shall be construed as limiting the existing ratemaking

9

authority of the commission, including, but not limited to, the

10

commission's existing authority to permit recovery of operating

11

expenses through an automatic adjustment clause, or as

12

indicating that the existing authority of the commission over

13

rate structure or design is limited.

14

(d)  Commission.--The commission, by regulation or order,

15

shall prescribe the specific procedures to be followed in

16

establishing the alternative regulatory procedures and

17

mechanisms authorized in this section. An alternative regulatory

18

mechanism approved by the commission under this section shall:

19

(1)  Provide for reasonable allocation of costs to the

20

customer class responsible for those costs.

21

(2)  Provide for adjustment of the mechanism, including a

22

process to provide:

23

(i)  Credit to customer accounts for over collections

24

and collections for ineligible projects.

25

(ii)  Charges to customer accounts for under

26

collections.

27

(3)  Provide for a cap on the amount that may be

28

collected from customers through an alternative regulatory

29

mechanism authorized by subsection (b)(2)(i)(B).

30

Section 3.  This act shall take effect in 60 days.

- 4 -

 


1

Section 1.  Sections 308(b), 308.2(a)(11) and 315(e) of Title

<--

2

66 of the Pennsylvania Consolidated Statutes are amended to

3

read:

4

§ 308.  Bureaus and offices.

5

* * *

6

(b)  Law Bureau.--The Law Bureau shall be a multifunction

7

legal staff, consisting of a prosecutory function, an advisory

8

function, a representational function and an enforcement

9

function. The Director of the Law Bureau shall be the chief

10

counsel of the commission and shall serve at the pleasure of the

11

commission. The commission may also, from time to time, appoint

12

such assistant counsel to the commission as may be required for

13

the proper conduct of the work of the Law Bureau. Assistant

14

counsel may be removed by the commission only for good cause.

15

The Law Bureau shall advise the commission on any and all

16

matters. No counsel shall in the same case or a factually

17

related case perform duties in the prosecutory and advisory

18

functions, if such performance would represent a conflict of

19

interest. Except for litigation referred to the Attorney General

20

or other appropriate outside counsel, the Law Bureau solely

21

shall be responsible to represent the commission upon appeals

22

and other hearings in the courts of common pleas and in the

23

Commonwealth Court, Supreme Court or other courts of this

24

Commonwealth or in any Federal court or agency and in actions

25

instituted to recover penalties and to enforce regulations and

26

orders of the commission. If necessary to protect the public

27

interest, the Law Bureau, pursuant to its prosecutorial

28

function, may initiate and participate in proceedings before the

29

commission [unless directed by the commission to do so in a

30

proceeding involving transportation, safety, eminent domain,

- 5 -

 


1

siting, service issues having no impact on rates or ability to

2

pay or assist the Office of Trial Staff in carrying out the

3

duties of the Office of Trial Staff, nor shall any member of the

4

Law Bureau receive assistance from the Office of Trial Staff in

5

the performance of his duties. Except as provided in this

6

section, the Law Bureau may receive assistance from any other

7

bureau or office of the commission as determined to be

8

necessary].

9

* * *

10

§ 308.2.  Other bureaus, offices and positions.

11

(a)  Establishment of other bureaus, offices and positions.--

12

In addition to the specific bureaus established in this part,

13

the commission may establish other bureaus, offices and

14

positions to perform the following functions:

15

* * *

16

(11)  Take appropriate enforcement actions, including

17

rate proceedings, service proceedings and [allocation]

18

application proceedings, necessary to insure compliance with

19

this title, commission regulations and orders.

20

* * *

21

§ 315.  Burden of proof.

22

* * *

23

(e)  Use of future test year.--In discharging its burden of

24

proof the utility may utilize a future test year or a fully

25

projected future test year, which shall be the 12-month period

26

beginning with the first month that the new rates will be placed

27

in effect after application of the full suspension period

28

permitted under section 1308(d) (relating to voluntary changes

29

in rates). The commission shall promptly adopt rules and

30

regulations regarding the information and data to be submitted

- 6 -

 


1

when and if a future test period or a fully projected future

2

test year is to be utilized. Whenever a utility utilizes a

3

future test year or a fully projected future test year in any

4

rate proceeding and such future test year or a fully projected

5

test year forms a substantive basis for the final rate

6

determination of the commission, the utility shall provide, as

7

specified by the commission in its final order, appropriate data

8

evidencing the accuracy of the estimates contained in the future

9

test year or a fully projected future test year, and the

10

commission may after reasonable notice and hearing, in its

11

discretion, adjust the utility's rates on the basis of such

12

data. Notwithstanding section 1315 (relating to limitation on

<--

13

consideration of certain costs for electric utilities), the

14

commission may permit facilities which are projected to be in

15

service during the fully projected future test year to be

16

included in the rate base.

17

Section 2.  The heading of Chapter 13 of Title 66 is amended

18

and the chapter is amended by adding a subchapter heading to

19

read:

20

CHAPTER 13 

21

RATES AND [RATE MAKING] DISTRIBUTION SYSTEMS

22

SUBCHAPTER A

23

RATES

24

Section 3.  Section 1307(g) of Title 66 is repealed:

25

§ 1307.  Sliding scale of rates; adjustments.

26

* * *

27

[(g)  Recovery of costs related to distribution system

28

improvement projects designed to enhance water quality, fire

29

protection reliability and long-term system viability.--Water

30

utilities may file tariffs establishing a sliding scale of rates

- 7 -

 


1

or other method for the automatic adjustment of the rates of the

2

water utility as shall provide for recovery of the fixed costs

3

(depreciation and pretax return) of certain distribution system

4

improvement projects, as approved by the commission, that are

5

completed and placed in service between base rate proceedings.

6

The commission, by regulation or order, shall prescribe the

7

specific procedures to be followed in establishing the sliding

8

scale or other automatic adjustment method.]

9

* * *

10

Section 4.  Section 1311(c) of Title 66 is amended and the

11

section is amended by adding a subsection to read:

12

§ 1311.  Valuation of and return on the property of a public

13

utility.

14

* * *

15

(c)  Segregation of property.--When any public utility

16

furnishes more than one of the different types of utility

17

service, the commission shall segregate the property used and

18

useful in furnishing each type of such service, and shall not

19

consider the property of such public utility as a unit in

20

determining the value of the rate base of such public utility

21

for the purpose of fixing base rates. A utility that provides

22

water and wastewater service shall be exempt from this

23

subsection upon petition of a utility to combine water and

24

wastewater revenue requirements. The commission when setting

25

base rates, after notice and an opportunity to be heard, may

26

allocate a portion of the wastewater revenue requirement to the

27

combined water and wastewater customer base if in the public

28

interest.

29

* * *

30

(e)  Definition.--As used in this section, the term "utility

- 8 -

 


1

that provides both water and wastewater service" shall include a 

<--

2

subsidiary company separate companies that individually provides 

<--

3

provide water or wastewater service if the company is so long as

<--

4

the companies are wholly owned by a common parent company.

5

Section 5.  Section 1327(b) introductory paragraph of Title

6

66 is amended to read:

7

§ 1327.  Acquisition of water and sewer utilities.

8

* * *

9

(b)  Procedure.--The commission, upon application by a public

10

utility, person or corporation which has agreed to acquire

11

property from another public utility, municipal corporation or

12

person, may approve an inclusion in rate base in accordance with

13

subsection (a) prior to the acquisition and prior to a

14

proceeding under this [chapter] subchapter to determine just and

15

reasonable rates if:

16

* * *

17

Section 6.  Chapter 13 of Title 66 is amended by adding a

18

subchapter to read:

19

SUBCHAPTER B

20

DISTRIBUTION SYSTEMS

21

Sec.

22

1350.  Scope of subchapter.

23

1351.  Definitions.

24

1352.  Long-term infrastructure improvement plan.

25

1353.  Distribution system improvement charge.

26

1354.  Customer notice.

27

1355.  Review.

28

1356.  Asset optimization plans.

29

1357.  Computation of charge.

30

1358.  Customer protections.

- 9 -

 


1

1359.  Projects.

2

1360.  Applicability.

3

§ 1350.  Scope of subchapter.

4

This subchapter shall provide an additional mechanism for a

5

distribution system to recover costs related to the repair,

6

improvement and replacement of eligible property.

7

§ 1351.  Definitions.

8

The following words and phrases when used in this subchapter

9

shall have the meanings given to them in this section unless the

10

context clearly indicates otherwise:

11

"Capitalized cost."  Costs permitted to be capitalized

12

pursuant to the Uniform System of Accounts and Generally

13

Accepted Accounting Principles.

14

"Distribution system."  A system owned or operated by a

15

utility. The term includes a natural gas distribution company, a

16

city natural gas distribution operation, an electric

17

distribution company, a water utility and a collection system

18

for a wastewater utility.

19

"Distribution system improvement charge."  A charge imposed

20

by a utility to recover the reasonable and prudent costs

21

incurred to repair, improve or replace eligible property that is

22

part of the utility's distribution system.

23

"Eligible property."  Property that is part of a distribution

24

system and eligible for repair, improvement and replacement of

25

existing infrastructure under this subchapter. Included property

<--

26

shall be as follows:

27

(1)  For electric distribution companies, eligible

28

property shall include:

29

(i)  Poles and towers.

30

(ii)  Overhead and underground conductors.

- 10 -

 


1

(iii)  Transformers and substation equipment.

2

(iv)  Any fixture or device related to eligible

3

property under subparagraphs (i), (ii) and (iii),

4

including insulators, circuit breakers, fuses, reclosers,

5

grounding wires, crossarms and brackets, relays,

6

capacitors, converters and condensers.

7

(v)  Unreimbursed funds costs related to highway

<--

8

relocation projects where an electric distribution

9

company must relocate its facilities.

10

(vi)  Other related capitalized costs.

11

(2)  For natural gas distribution companies and city

12

natural gas distribution operations, eligible property shall

13

include:

14

(i)  Piping.

15

(ii)  Couplings.

16

(iii)  Gas services lines and insulated and

17

noninsulated fittings.

18

(iv)  Valves.

19

(v)  Excess flow valves.

20

(vi)  Risers.

21

(vii)  Meter bars.

22

(viii)  Meters.

23

(ix)  Unreimbursed funds costs related to highway

<--

24

relocation projects where a natural gas distribution

25

company or city natural gas distribution operation must

26

relocate its facilities.

27

(x)  Other related capitalized costs.

28

(3)  For water utilities, eligible property shall

29

include:

30

(i)  Utility service lines, meters and hydrants

- 11 -

 


1

installed as in-kind replacements for customers.

2

(ii)  Mains and valves installed as replacements for

3

existing facilities that have worn out, are in

4

deteriorated condition or are required to be upgraded to

5

meet under 52 Pa. Code Ch. 65 (relating to water

6

service).

7

(iii)  Main extensions installed to eliminate dead

8

ends and to implement solutions to regional water supply

9

problems that present a significant health and safety

10

concern for customers currently receiving service from

11

the water utility.

12

(iv)  Main cleaning and relining projects.

13

(v)  Unreimbursed funds costs related to highway

<--

14

relocation projects where a water utility must relocate

15

its facilities.

16

(vi)  Other related capitalized costs.

17

(4)  For wastewater utilities, eligible property shall

18

include:

19

(i)  Collection sewers, collecting mains and service

20

laterals, including sewer taps, curbstops and lateral

21

cleanouts installed as in-kind replacements for

22

customers.

23

(ii)  Collection mains and valves for gravity and

24

pressure systems and related facilities such as manholes,

25

grinder pumps, air and vacuum release chambers,

<--

26

cleanouts, main line flow meters, valve vaults and lift

27

stations installed as replacements or upgrades for

28

existing facilities that have worn out, are in

29

deteriorated condition or are required to be upgraded by

30

law, regulation or order.

- 12 -

 


1

(iii)  Collection main extensions installed to

2

implement solutions to wastewater problems that present a

3

significant health and safety concern for customers

4

currently receiving service from the wastewater utility.

5

(iv)  Collection main rehabilitation including inflow

6

and infiltration projects.

7

(v)  Unreimbursed funds costs related to highway

<--

8

relocation projects where a wastewater utility must

9

relocate its facilities.

10

(vi)  Other related capitalized costs.

11

"Utility."  A natural gas distribution company, electric

12

distribution company, water or wastewater utility or city

13

natural gas distribution operation.

14

§ 1352.  Long-term infrastructure improvement plan.

15

(a)  Submission.--In order to be eligible to recover costs

16

under section 1353 (relating to distribution system improvement

17

charge), a utility must submit a long-term infrastructure

18

improvement plan. The plan shall include the following:

19

(1)  Identification of the types and age of eligible

20

property owned or operated by the utility for which the

21

utility would seek recovery under this subchapter.

22

(2)  A An initial schedule for the planned repair and

<--

23

replacement of eligible property.

24

(3)  A general description of the location of the

25

eligible property.

26

(4)  A reasonable estimate of the quantity of eligible

27

property to be improved.

28

(5)  Projected annual expenditures to implement the plan

29

and measures taken to ensure that the plan is cost effective.

30

(6)  The manner in which the replacement of aging

- 13 -

 


1

infrastructure will be accelerated and how the repair and, 

<--

2

improvement or replacement will ensure and maintain adequate,

3

efficient, safe, reliable and reasonable service.

4

(7)  If the plan is not adequate and sufficient to ensure

5

and maintain adequate, efficient, safe, reliable and

6

reasonable service, the commission shall order a new or

7

revised plan.

8

(b)  Periodic review.--

9

(1)  The commission shall promulgate regulations for the

10

periodic review at least once every five years of long-term

11

infrastructure plans. The regulations may authorize a utility

12

to revise, update or resubmit a plan as appropriate.

13

(2)  The regulations shall ensure that a distribution

14

system improvement charge shall terminate if the commission

15

determines that the utility is not in compliance with the

16

approved plan.

17

§ 1353.  Distribution system improvement charge.

18

(a)  Authority.--Except as provided under this subchapter,

19

after January 1, 2013, a utility may petition the commission

20

for, or the commission, after notice and hearing, may approve

21

the establishment of a distribution system improvement charge to

22

provide for the timely recovery of the reasonable and prudent

23

costs incurred to repair, improve or replace eligible property

24

in order to ensure and maintain adequate, efficient, safe,

25

reliable and reasonable service.

26

(b)  Petition.--A petition for commission approval of a

27

distribution system improvement charge shall include the

28

following:

29

(1)  An initial tariff that complies with a model tariff

30

adopted by the commission. The proposed tariff shall include

- 14 -

 


1

the following:

2

(i)  A description of the eligible property.

3

(ii)  The effective date of the distribution system

4

improvement charge.

5

(iii)  Computation of the distribution system

6

improvement charge.

7

(iv)  The method by which the utility will provide

8

quarterly updates of the distribution improvement charge.

9

(v)  A description of consumer protections.

10

(2)  Testimony, affidavits, exhibits or other evidence

11

that demonstrates that a distribution improvement system

12

charge is in the public interest and will facilitate utility

13

compliance with the following:

14

(i)  The provision and maintenance of adequate,

15

efficient, safe, reliable and reasonable service

16

consistent with section 1501 (relating to character of

17

service and facilities).

18

(ii)  Commission regulations and orders relating to

19

the provision and maintenance of adequate, efficient,

20

safe, reliable and reasonable service.

21

(iii)  Any other requirement under Federal or State

22

law relating to the provision and maintenance of

23

adequate, efficient, safe, reliable and reasonable

24

service.

25

(3)  A long-term infrastructure improvement plan under

26

section 1352 (relating to long-term infrastructure

27

improvement plan).

28

(4)  Certification that a base rate case has been filed

29

within the last five years prior to the date of the filing of

<--

30

the petition under section 1308(d) (relating to voluntary

- 15 -

 


1

changes in rates).

2

(5)  If a base rate case has not been filed within five

3

years prior to the effective date of this section date of the

<--

4

filing of the petition, the utility must file a base rate

5

case in order to be eligible for a distribution system

6

improvement charge.

7

(6)  Any other information required by the commission.

8

§ 1354.  Customer notice.

9

Utilities shall provide notice to customers in bill inserts

10

or through other means as prescribed by the commission of the

<--

11

following:

12

(1)  Submission of the proposed distribution system

13

improvement charge and initial tariff.

14

(2)  Notice of the commission's disposition of the

15

submission under paragraph (1).

16

(3)  Any changes that occur as a result of quarterly

17

adjustments.

18

(4)  Any other information required by the commission.

19

§ 1355.  Review.

20

Following the filing of a petition in compliance with section

21

1353 (relating to distribution system improvement charge), the

22

commission shall, after notice and opportunity to be heard,

23

approve, modify or reject the distribution system improvement

24

charge and initial tariff. The commission shall hold evidentiary

25

and public input hearings as necessary to review the petition.

26

§ 1356.  Asset optimization plans.

27

A utility with an approved distribution system charge and

28

long-term infrastructure plan shall file annual asset

29

optimization plans. The plan shall include the following:

30

(1)  A description that specifies all eligible property

- 16 -

 


1

repaired, improved and replaced in the immediately preceding

2

12-month period pursuant to the utility's long-term

3

infrastructure improvement plan and prior year's asset

4

optimization plan.

5

(2)  A detailed description of all the facilities to be

6

improved in the upcoming 12-month period.

7

§ 1357.  Computation of charge.

8

(a)  Recovery.--The following shall apply:

9

(1)  The initial distribution system improvement charge

10

shall be calculated to recover the fixed cost of eligible

11

property that has:

12

(i)  Not previously been reflected in the utility's

13

rates or rate base.

<--

14

(ii)  Been placed in service during the three-month

15

period ending one month prior to the effective date of

16

the distribution improvement system charge.

17

(2)  After calculation of the initial charge under

18

paragraph (1), the distribution system improvement charge 

19

must be updated on a quarterly basis to reflect eligible

20

property placed in service during the three-month period

21

ending one month prior to the effective date of each

22

distribution system improvement charge update.

23

(3)  The fixed cost of eligible property shall consist of

24

depreciation and pretax return, except as provided for in

25

subsection (c) for city natural gas distribution operation.

26

(b)  Depreciation calculation.--Depreciation shall be

27

calculated by applying the original cost of the eligible

28

property to the annual accrual rates employed in the utility's

29

last most recent base rate case for the plant accounts in which

<--

30

each retirement unit of distribution system improvement charge 

- 17 -

 


1

eligible property is recorded. The following shall apply:

2

(1)  The pretax return shall be calculated using the

3

Federal and State income tax rates, the utility's actual

4

capital structure and actual cost rates for long-term debt

5

and preferred stock as of the last day of the three-month

6

period ending one month prior to the effective date of the

7

distribution system or collection system improvement charge

<--

8

and subsequent updates.

9

(2)  The cost of equity shall be the equity return rate

10

approved in the utility's last most recent fully litigated

<--

11

base rate proceeding for which a final order was entered not

12

more than two years prior to the effective date of the

13

distribution system or collection system improvement charge.

<--

14

(3)  If more than two years have elapsed between the

15

entry of a final order and the effective date of the

16

distribution system improvement charge, the equity return

17

rate used in the calculation shall be the equity return rate

18

calculated by the commission in the latest most recent 

<--

19

Quarterly Report on the Earnings of Jurisdictional Utilities

20

released by the commission.

21

(c)  Recovery of costs.--Utilities may file tariffs

22

establishing a sliding scale of rates or other method for the

23

automatic adjustment of the rates of the utility to provide for

24

recovery of the depreciation and pretax return fixed costs of

25

eligible property, as approved by the commission, that are

26

completed and placed in service between base rate proceedings.

27

For city natural gas distribution operations, recoverable costs

28

shall be amounts reasonably expended or incurred to purchase and

29

install recovery eligible property and associated financing

<--

30

costs, if any, including debt service, debt service coverage and

- 18 -

 


1

issuance costs.

2

(d)  Calculation.--

3

(1)  The distribution system improvement charge shall be

4

expressed as a percentage carried to two decimal places and

5

shall be applied in a manner consistent with section 1358

6

(relating to customer protections) to each customer under the

7

utility's applicable rates and charges. The charge shall not

8

be applied to amounts billed for public fire protection

9

service by water utilities and the State tax adjustment

10

surcharge.

11

(2)  The distribution system improvement charge shall be

12

calculated by dividing one-fourth of the annual fixed costs

13

associated with all eligible property under the distribution

14

system improvement charge by the projected revenue for the

15

quarterly period during which the distribution system will be

16

collected. The projected revenues shall not include revenues

17

from public fire protection service earned by water utilities

18

and the State tax adjustment surcharge.

19

(3)  Supporting data for each quarterly update shall be

20

filed with the commission and served upon the commission, the

21

Office of Consumer Advocate and the Office of Small Business

22

Advocate at least ten days prior to the effective date of the

23

update.

24

§ 1358.  Customer protections.

25

(a)  Limitation.--As follows:

26

(1)  Except as provided under paragraph (2), the

27

distribution system improvement charge may not exceed 5% of

28

the amount billed to customers under the applicable rates of

29

the wastewater utility or distribution rates of the electric

30

distribution company, natural gas distribution company or

- 19 -

 


1

city natural gas distribution operation. The commission may

2

upon petition grant a waiver of the 5% limit under this

3

paragraph for a utility in order to ensure and maintain

4

adequate, efficient, safe, reliable and reasonable service.

5

(2)  A distribution system improvement charge granted to

6

a water utility under former section 1307(g) (relating to

7

sliding scale of rates; adjustments) or this subchapter may

8

not exceed 7.5% of the amount billed to customers. All

9

proceedings, orders and other actions of the commission

10

related to a distribution system improvement charge granted

11

to a water utility and all practices and procedures of a

<--

12

water utility operating under a distribution system

13

improvement charge prior to the effective date of this

14

paragraph shall remain in effect unless specifically amended

15

or revoked by the commission.

16

(b)  Charge reset.--

17

(1)  The distribution system improvement charge shall be

<--

18

reset at zero as of the effective date of new base rates that

19

provide for prospective recovery of the annual costs

20

previously recovered under the distribution system or 

<--

21

improvement charge.

22

(2)  After the reset date under paragraph (1), only the

23

fixed costs of new eligible property that have not previously

24

been reflected in the utility's rate base shall be reflected

25

in the quarterly updates of the distribution system

26

improvement charge.

27

(3)  The distribution system improvement charge shall be

28

reset at zero if, in any quarter, data filed with the

29

commission in the utility's most recent annual or quarterly

30

earnings report show that the utility will earn a rate of

- 20 -

 


1

return that would exceed the allowable rate of return used to

2

calculate its fixed costs under the distribution system

3

improvement charge.

4

(c)  Construction.--Except as otherwise expressly provided

5

under this subchapter, nothing under this subchapter shall be

6

construed as limiting the existing ratemaking authority of the

7

commission, including the authority to permit recovery of

8

operating expenses through an automatic adjustment clause, or as

9

indicating that the existing authority of the commission over

10

rate structure or design is limited.

11

(d)  Commission.--The commission, by regulation or order,

12

shall prescribe the specific procedures to be followed to

13

approve a distribution system improvement charge. A distribution

14

system improvement charge approved by the commission shall

15

provide:

16

(1)  That the distribution system improvement charge

17

shall be applied equally to all customer classes as a

18

percentage of each customer's billed revenue, consistently

<--

19

with subsection (a).

20

(2)  A process to adjust the charge and to provide:

21

(i)  Credit to customer accounts for over collections

22

and collections for ineligible projects.

23

(ii)  Charges to customer accounts for under

24

collections.

25

(3)  A cap on the amount that may be collected from

26

customers under this subchapter.

27

(e)  Audit and reconciliation.--The following shall apply:

28

(1)  The distribution system improvement charge shall be

29

subject to the following:

30

(i)  Audit at intervals determined by the commission.

- 21 -

 


1

(ii)  Annual reconciliation based on a reconciliation

2

period consisting of the 12 months ending December 31 of

3

each year. The commission may also permit quarterly

<--

4

reconciliation.

5

(2)  The revenue received under the distribution system

6

improvement charge for the reconciliation period shall be

7

compared to the utility's eligible costs for that period. The

8

difference between revenue and costs shall be recouped or

9

refunded, as appropriate, in accordance with section 1307(e)

10

(relating to sliding scale of rates; adjustments), over a

11

one-year period or quarterly period commencing April 1 of

<--

12

each year.

13

(3)  If revenues received from the distribution system

<--

14

improvement charge exceed eligible costs, the over

15

collections shall be refunded with interest. Interest on the

16

over collections shall be calculated at the residential

17

mortgage lending rate specified by the Secretary of Banking

18

in accordance with the act of January 30, 1974 (P.L.13,

19

No.6), referred to as the Loan Interest and Protection Law,

20

and shall be refunded in the same manner as an over

21

collection.

22

(f)  Complaint.--The distribution system improvement charge

23

shall be subject to complaint under section 701 (relating to

24

complaints).

25

§ 1359.  Projects.

26

(a)  Standards.--The commission shall establish standards to

27

ensure that work on utility systems to repair, improve or

28

replace eligible property is performed by qualified employees of

29

either the utility or an independent contractor in a manner that

30

protects system reliability and the safety of the public.

- 22 -

 


1

(b)  Inspection.--Projects for which work to repair, improve

2

or replace eligible property is performed by independent

3

contractors shall be subject to reliability and safety standards

4

and to inspection by utility employees.

5

(c)  Cost.--Work on projects to repair, improve or replace

6

eligible property that is not performed by qualified employees

<--

7

or contractors or inspected by the utility's qualified personnel

8

shall not be eligible for recovery of a distribution system

9

improvement charge.

10

§ 1360.  Applicability.

11

(a)  Acceptance.--The commission may accept a long-term

12

infrastructure plan filed by a water utility prior to the

13

effective date of this subsection in order to comply with

14

section 1352 (relating to long-term infrastructure improvement

15

plan).

16

(b)  Submission.--The commission may require the submission

17

of a new long-term infrastructure plan by a water utility.

18

Section 7.  Section 3301(c) of Title 66 is amended to read:

19

§ 3301.  Civil penalties for violations.

20

* * *

21

(c)  Gas pipeline safety violations.--Any person or

22

corporation, defined as a public utility in this part, who

23

violates any provisions of this part governing the safety of

24

pipeline or conduit facilities in the transportation of natural

25

gas, flammable gas, or gas which is toxic or corrosive, or of

26

any regulation or order issued thereunder, shall be subject to a

27

civil penalty of not to exceed [$10,000] $200,000 for each

28

violation for each day that the violation persists, except that

29

the maximum civil penalty shall not exceed [$500,000] $2,000,000 

30

for any related series of violations, or subject to a penalty

- 23 -

 


1

provided under Federal pipeline safety laws, whichever is

2

greater.

3

* * *

4

Section 8.  This act shall take effect in 60 days.

- 24 -