PRINTER'S NO.  3357

  

THE GENERAL ASSEMBLY OF PENNSYLVANIA

  

HOUSE BILL

 

No.

2291

Session of

2010

  

  

INTRODUCED BY D. EVANS, MARCH 15, 2010

  

  

REFERRED TO COMMITTEE ON APPROPRIATIONS, MARCH 15, 2010  

  

  

  

AN ACT

  

1

Providing for the capital budget for the fiscal year 2010-2011;

2

itemizing public improvement projects, furniture and

3

equipment projects, transportation assistance projects,

4

redevelopment assistance capital projects, flood control

5

projects, Keystone Recreation, Park and Conservation Fund

6

projects, Environmental Stewardship Fund projects, State

7

forestry bridge projects, General Fund current revenue

8

projects, State ATV/Snowmobile Fund projects and State

9

transportation enhancement funds projects to be constructed

10

or acquired or assisted by the Department of General

11

Services, the Department of Community and Economic

12

Development, the Department of Conservation and Natural

13

Resources, or the Department of Transportation, together with

14

their estimated financial costs; authorizing the incurring of

15

debt without the approval of the electors for the purpose of

16

financing the projects to be constructed, acquired or

17

assisted by the Department of General Services, the

18

Department of Community and Economic Development, the

19

Department of Conservation and Natural Resources, the

20

Department of Environmental Protection or the Department of

21

Transportation; stating the estimated useful life of the

22

projects; providing an exemption; providing for limitation on

23

certain capital projects; and making appropriations.

24

The General Assembly of the Commonwealth of Pennsylvania

25

hereby enacts as follows:

26

Section 1.  Short title.

27

This act shall be known and may be cited as the Capital

28

Budget Project Itemization Act of 2010-2011.

29

Section 2.  Total authorizations.

 


1

(a)  Public improvements.--The total authorization for the

2

additional capital projects in the category of public

3

improvement projects itemized in section 3 and to be acquired or

4

constructed by the Department of General Services, its

5

successors or assigns, and to be financed by the incurring of

6

debt shall be $1,134,191,000.

7

(b)  Furniture and equipment.--The total authorization for

8

the additional capital projects in the category of public

9

improvement projects consisting of the acquisition of original

10

movable furniture and equipment to complete public improvement

11

projects itemized in section 4 and to be acquired by the

12

Department of General Services, its successors or assigns, and

13

to be financed by the incurring of debt shall be $30,471,000.

14

(c)  Transportation assistance.--The total authorization for

15

the capital projects in the category of transportation

16

assistance projects itemized in section 5 with respect to which

17

an interest is to be acquired in or constructed by the

18

Department of Transportation, its successors or assigns, and to

19

be financed by the incurring of debt shall be $506,042,000.

20

(d)  Redevelopment assistance.--The total authorization for

21

the additional capital projects in the category of redevelopment

22

assistance capital projects itemized in section 6 for capital

23

grants by the Department of Community and Economic Development,

24

its successors or assigns, and to be financed by the incurring

25

of debt shall be $2,724,739,000.

26

(e)  Flood control.--The total authorization for the capital

27

projects in the category of flood control projects itemized in

28

section 7 and to be constructed by the Department of

29

Environmental Protection, its successors or assigns, and to be

30

financed by the incurring of debt, shall be $9,300,000.

- 2 -

 


1

(f)  Keystone Recreation, Park and Conservation Fund.--The

2

total authorization for the capital projects in the category of

3

public improvement projects itemized in section 8 and to be

4

constructed by the Department of Conservation and Natural

5

Resources, its successors or assigns, and to be financed from

6

current revenues in the Keystone Recreation, Park and

7

Conservation Fund shall be $51,825,000.

8

(g)  Environmental Stewardship Fund projects.--The total

9

authorization for the capital projects in the category of public

10

improvement projects itemized in section 9 and to be constructed

11

by the Department of Conservation and Natural Resources, its

12

successors or assigns, and to be financed from current revenues

13

in the Environmental Stewardship Fund shall be $20,050,000.

14

(h)  State forestry bridge projects.--The total authorization

15

for the capital projects itemized in section 10 to be

16

constructed by the Department of Conservation and Natural

17

Resources, its successors or assigns, and to be financed by oil

18

company franchise tax revenues pursuant to 75 Pa.C.S. § 9502(a)

19

(2)(iv) (relating to imposition of tax) shall be $11,605,000.

20

(i)  General Fund current revenue projects.--The total

21

authorization for the capital projects in the category of public

22

improvement projects itemized in section 11 and to be developed

23

or constructed by the Department of General Services, its

24

successors or assigns, and to be financed from current revenues

25

in the General Fund shall be $11,400,000.

26

(j)  State ATV/snowmobile projects.--The total authorization

27

for the capital projects itemized in section 12 to be

28

constructed by the Department of Conservation and Natural

29

Resources, its successors or assigns, and to be financed from

30

current revenues in the State ATV/Snowmobile Fund shall be

- 3 -

 


1

$600,000.

2

(k)  State transportation enhancement projects.--The total

3

authorization for the capital projects itemized in section 13 to

4

be constructed by the Department of Conservation and Natural

5

Resources, its successors and assigns, and to be financed from

6

current revenues from State transportation enhancement funds

7

shall be $5,000,000.

8

Section 3.  Itemization of public improvement capital projects.

9

Additional capital projects in the category of public

10

improvement projects to be constructed or acquired by the

11

Department of General Services, its successors or assigns, and

12

to be financed by the incurring of debt, are hereby itemized,

13

together with their respective estimated financial costs, as

14

follows:

15

16

  

Project

Total Project Allocation

17

(1)  Department of Agriculture

  

18

(i)  Department Headquarters

  

19

20

(A)  Replace high voltage switchgear and

related components

  

  

21

Project Allocation

2,000,000

22

(Base Project Allocation - $1,800,000)

  

23

(Design and Contingencies - $200,000)

  

24

(ii)  Agricultural Building

  

25

26

27

(A)  Construct new plant industry laboratory

wing attached to current building for

diagnostic testing

  

  

  

28

Project Allocation

10,000,000

29

(Base Project Allocation - $9,000,000)

  

30

(Design and Contingencies - $1,000,000)

  

- 4 -

 


1

(iii)  Farm Show Complex

  

2

3

4

5

(A)  Upgrade Farm Show Complex facilities,

including HVAC, surveillance system,

renewable energy equipment, roadway

access, flooding and public restrooms

  

6

Project Allocation

12,000,000

7

(Base Project Allocation - $10,800,000)

  

8

(Design and Contingencies - $1,200,000)

  

9

10

11

(B)  Modify and construct administrative

office space for staff in the Farm Show

Complex

  

12

Project Allocation

5,000,000

13

(Base Project Allocation - $4,500,000)

  

14

(Design and Contingencies - $500,000)

  

15

16

(iv)  Pennsylvania Animal Diagnostic Laboratory

System

  

17

18

19

20

21

(A)  Construct a new Pennsylvania Animal

Health Diagnostic Laboratory (PADLS)

with Bio-Safety Level-3 capabilities to

support PADLS at The Pennsylvania State

University

  

22

Project Allocation

33,000,000

23

(Base Project Allocation - $29,700,000)

  

24

(Design and Contingencies - $3,300,000)

  

25

26

27

28

(B)  Construct a new Pennsylvania Animal

Health Diagnostic Laboratory (PADLS)

with Bio-Safety Level-3 capabilities to

support PADLS at New Bolton Center

  

29

Project Allocation

29,000,000

30

(Base Project Allocation - $26,100,000)

  

- 5 -

 


1

(Design and Contingencies - $2,900,000)

  

2

(v)  Pennsylvania Fairs

  

3

4

5

(A)  Renovate and upgrade facilities at

various fair sites throughout this

Commonwealth

  

6

Project Allocation

2,000,000

7

(Base Project Allocation - $1,800,000)

  

8

(Design and Contingencies - $200,000)

  

9

(vi)  State Farms

  

10

11

12

13

(A)  Renovate and upgrade State Farm in

Berks County, including structural

repairs, electrical, plumbing and

roofing

  

14

Project Allocation

5,000,000

15

(Base Project Allocation - $4,500,000)

  

16

(Design and Contingencies - $500,000)

  

17

18

19

20

(B)  Renovate and upgrade State Farm in

Snyder County, including structural

repairs, electrical, plumbing and

roofing

  

21

Project Allocation

5,000,000

22

(Base Project Allocation - $4,500,000)

  

23

(Design and Contingencies - $500,000)

  

24

(vii)  State Dairy Farm

  

25

26

27

(A)  Enhance operation of dairy farm

incubator project on grounds of DGS

Annex

  

28

Project Allocation

500,000

29

(Base Project Allocation - $450,000)

  

30

(Design and Contingencies - $50,000)

  

- 6 -

 


1

2

(2)  Department of Conservation and Natural

Resources

  

  

3

(i)  Black Moshannon State Park

  

4

5

6

(A)  Develop 10 additional modern family

cabins including construction, vehicle

access, circulation and infrastructure

  

7

Project Allocation

3,000,000

8

(Base Project Allocation - $2,400,000)

  

9

(Design and Contingencies - $600,000)

  

10

(ii)  Chapman State Park

  

11

(A)  Rehabilitate dam

  

12

Project Allocation

15,000,000

13

(Base Project Allocation - $12,000,000)

  

14

(Design and Contingencies - $3,000,000)

  

15

(iii)  Codorus State Park

  

16

17

18

(A)  Develop 10 additional modern family

cabins including construction, vehicle

access, circulation and infrastructure

  

19

Project Allocation

3,000,000

20

(Base Project Allocation - $2,400,000)

  

21

(Design and Contingencies - $600,000)

  

22

(iv)  Cook Forest State Park

  

23

24

(A)  Replace pit latrines with modern flush

facilities, including infrastructure

  

25

Project Allocation

1,281,000

26

(Base Project Allocation - $1,081,000)

  

27

(Design and Contingencies - $200,000)

  

28

(v)  Delaware Canal State Park

  

29

30

(A)  Rehabilitate historic Delaware Canal

from Easton to Bristol

  

- 7 -

 


1

Project Allocation

3,000,000

2

(Base Project Allocation - $2,400,000)

  

3

(Design and Contingencies - $600,000)

  

4

(vi)  Forest District 3

  

5

6

(A)  Rehabilitate and repair Gunther Valley

Dam

  

7

Project Allocation

9,000,000

8

(Base Project Allocation - $7,500,000)

  

9

(Design and Contingencies - $1,500,000)

  

10

(vii)  Forest District 6

  

11

12

(A)  Construct new forest district office,

including infrastructure

  

13

Project Allocation

6,000,000

14

(Base Project Allocation - $4,800,000)

  

15

(Design and Contingencies - $1,200,000)

  

16

(viii)  Forest District 10

  

17

18

19

(A)  Construct connector road and bridge

between Bloody Skillet recreational ATV

trail and township road, Litke Tract

  

20

Project Allocation

4,000,000

21

(Base Project Allocation - $3,200,000)

  

22

(Design and Contingencies - $800,000)

  

23

(ix)  Forest District 18

  

24

25

26

27

28

29

(A)  Construct rest facilities and parking

lots, rehabilitate public multiple use

trail/administrative road, refurbish

living quarters as departmental training

facility and purchase maintenance

equipment

  

30

Project Allocation

3,000,000

- 8 -

 


1

(Base Project Allocation - $2,400,000)

  

2

(Design and Contingencies - $600,000)

  

3

(x)  Kettle Creek State Park

  

4

5

6

(A)  Dredge lake around Kettle Creek

Reservoir to improve quality

recreational opportunities

  

7

Project Allocation

2,000,000

8

(Base Project Allocation - $1,600,000)

  

9

(Design and Contingencies - $400,000)

  

10

(xi)  Kinzua Bridge State Park

  

11

12

(A)  Develop park facilities including day-

use and overnight facilities

  

13

Project Allocation

3,000,000

14

(Base Project Allocation - $2,400,000)

  

15

(Design and Contingencies - $600,000)

  

16

(xii)  Lackawanna State Park

  

17

18

(A)  Develop overnight family cabin colony,

including infrastructure

  

19

Project Allocation

3,000,000

20

(Base Project Allocation - $2,400,000)

  

21

(Design and Contingencies - $600,000)

  

22

(xiii)  Laurel Hill State Park

  

23

24

25

26

27

(A)  Rehabilitate seven organized group

camps including water, sewer, utility

upgrades, mess hall rehabilitation, roof

replacement, parking, trails, masonry

work and window and door replacements

  

28

Project Allocation

4,000,000

29

(Base Project Allocation - $3,200,000)

  

30

(Design and Contingencies - $800,000)

  

- 9 -

 


1

2

(B)  Develop overnight family cabin colony,

including infrastructure

  

3

Project Allocation

3,000,000

4

(Base Project Allocation - $2,400,000)

  

5

(Design and Contingencies - $600,000)

  

6

(xiv)  Little Buffalo State Park

  

7

8

(A)  Rehabilitate recently acquired family

campground to meet State park standards

  

9

Project Allocation

2,500,000

10

(Base Project Allocation - $2,000,000)

  

11

(Design and Contingencies - $500,000)

  

12

(xv)  Little Pine State Park

  

13

(A)  Dredge Little Pine Lake

  

14

Project Allocation

7,500,000

15

(Base Project Allocation - $6,000,000)

  

16

(Design and Contingencies - $1,500,000)

  

17

(xvi)  Nescopeck State Park

  

18

19

20

(A)  Develop group camping facilities at new

2,981-acre section, including overnight

facilities and infrastructure

  

21

Project Allocation

2,000,000

22

(Base Project Allocation - $1,600,000)

  

23

(Design and Contingencies - $400,000)

  

24

25

(B)  Develop overnight family cabin colony,

including infrastructure

  

  

26

Project Allocation

3,000,000

27

(Base Project Allocation - $2,400,000)

  

28

(Design and Contingencies - $600,000)

  

29

(xvii)  Ohiopyle State Park

  

30

(A)  Develop overnight family cabin colony,

  

- 10 -

 


1

including infrastructure

2

Project Allocation

3,000,000

3

(Base Project Allocation - $2,400,000)

  

4

(Design and Contingencies - $600,000)

  

5

(xviii)  Promised Land State Park

  

6

7

8

(A)  Upgrades to campsite and other

amenities, including construction and

other infrastructure

  

9

Project Allocation

1,600,000

10

(xix)  Pymatuning State Park

  

11

12

(A)  Develop new and improved trail system

to meet current standards

  

13

Project Allocation

2,000,000

14

(Base Project Allocation - $1,600,000)

  

15

(Design and Contingencies - $400,000)

  

16

(xx)  Sinnemahoning State Park

  

17

18

(A)  Rehabilitate dam and dredge George B.

Stevens Lake

  

19

Project Allocation

5,000,000

20

(Base Project Allocation - $4,000,000)

  

21

(Design and Contingencies - $1,000,000)

  

22

23

24

(B)  Replace park maintenance facility and

forest district 13 maintenance building,

including infrastructure

  

25

Project Allocation

3,000,000

26

(Base Project Allocation - $2,400,000)

  

27

(Design and Contingencies - $600,000)

  

28

(xxi)  Yellow Creek State Park

  

29

30

(A)  Develop 10 additional modern family

cabins including construction, vehicle

  

- 11 -

 


1

access, circulation and infrastructure

2

Project Allocation

3,000,000

3

(Base Project Allocation - $2,400,000)

  

4

(Design and Contingencies - $600,000)

  

5

6

(xxii)  Multiple State Parks and Forests,

Statewide

  

7

8

(A)  Replace or rehabilitate forest fire

lookout towers

  

9

Project Allocation

6,000,000

10

(Base Project Allocation - $4,800,000)

  

11

(Design and Contingencies - $1,200,000)

  

12

(xxiii)  Clearfield County

  

13

14

15

16

17

(A)  Acquisition, construction,

redevelopment and other related costs

for Phase II of the Clearfield Firemen's

Commerce Park project in Lawrence

Township

  

18

Project Allocation

5,000,000

19

(xxiv)  Erie County

  

20

21

22

(A)  Construction, infrastructure and other

related costs for park renovations in

Millcreek Township

  

23

Project Allocation

5,000,000

24

(3)  Department of Corrections

  

25

26

(i)  State Correctional Institution at Cambridge

Springs

  

  

27

28

29

(A)  Build new gymnasium and chapel with

multipurpose rooms to support treatment

programs

  

30

Project Allocation

2,000,000

- 12 -

 


1

(Base Project Allocation - $1,600,000)

  

2

(Design and Contingencies - $400,000)

  

3

4

(B)  Construct addition to dietary building

to support future requirements

  

5

Project Allocation

2,300,000

6

(Base Project Allocation - $1,840,000)

  

7

(Design and Contingencies - $460,000)

  

8

(ii)  State Correctional Institution at Chester

  

9

10

11

(A)  Replace buried perimeter intrusion

system around entire perimeter of

institution

  

12

Project Allocation

1,200,000

13

(Base Project Allocation - $960,000)

  

14

(Design and Contingencies - $240,000)

  

15

(iii)  State Correctional Institution at Cresson

  

16

17

(A)  Design new kitchen and loading dock to

serve expanded inmate population

  

  

18

Project Allocation

2,300,000

19

(Base Project Allocation - $1,840,000)

  

20

(Design and Contingencies - $460,000)

  

21

(iv)  State Correctional Institution at Dallas

  

22

23

24

(A)  Replace all steam lines and valves,

including exposed and buried, throughout

the institution

  

25

Project Allocation

2,500,000

26

(Base Project Allocation - $2,000,000)

  

27

(Design and Contingencies - $500,000)

  

28

29

30

(B)  Lease and/or purchase an emergency

housing facility, including related

infrastructure improvements

  

- 13 -

 


1

Project Allocation

3,500,000

2

(Base Project Allocation - $3,500,000)

  

3

(v)  State Correctional Institution at Forest

  

4

5

6

(A)  Lease and/or purchase an emergency

housing facility, including related

infrastructure improvements

  

7

Project Allocation

3,500,000

8

(Base Project Allocation - $3,500,000)

  

9

10

(vi)  State Correctional Institution at

Frackville

  

  

11

12

13

(A)  Replace buried perimeter intrusion

system around entire perimeter of the

institution

  

14

Project Allocation

750,000

15

(Base Project Allocation - $600,000)

  

16

(Design and Contingencies - $150,000)

  

17

18

(vii)  State Correctional Institution at

Graterford

  

  

19

20

21

22

23

24

(A)  Additional funds for DGS project

577-35, construct new roadway to access

SCI Graterford off Route 73, phase 2,

completion of new access roadway into

the institution due to the closing of SR

73 bridge and site road updates

  

  

  

  

25

Project Allocation

5,000,000

26

(Base Project Allocation - $4,000,000)

  

27

(Design and Contingencies - $1,000,000)

  

28

(viii)  State Correctional Institution at Greene

  

29

30

(A)  Replace perimeter intrusion system

around entire perimeter of the

  

- 14 -

 


1

institution

2

Project Allocation

1,200,000

3

(Base Project Allocation - $960,000)

  

4

(Design and Contingencies - $240,000)

  

5

6

(ix)  State Correctional Institution at

Huntingdon

  

  

7

8

(A)  Upgrade security fence, windows, grills

and cell doors and expand control center

  

9

Project Allocation

2,000,000

10

(Base Project Allocation - $1,600,000)

  

11

(Design and Contingencies - $400,000)

  

12

13

14

(B)  Replace electrical service into blocks

and cells which are insufficient to meet

requirements

  

15

Project Allocation

3,200,000

16

(Base Project Allocation - $2,560,000)

  

17

(Design and Contingencies - $640,000)

  

18

19

(x)  State Correctional Institution at Laurel

Highlands

  

20

21

22

23

(A)  Replace roof with combination of rubber

and standing seam metal roof, including

a hatch to access the roof from inside

the building

  

24

Project Allocation

750,000

25

(Base Project Allocation - $600,000)

  

26

(Design and Contingencies - $150,000)

  

27

(xi)  State Correctional Institution at Mahanoy

  

28

29

30

(A)  Replace boilers and related equipment

in Building 4 to tie into existing

equipment and remove back-up boiler

  

- 15 -

 


1

Project Allocation

2,200,000

2

(Base Project Allocation - $1,760,000)

  

3

(Design and Contingencies - $440,000)

  

4

(xii)  State Correctional Institution at Mercer

  

5

6

7

(A)  Replace perimeter intrusion system

around entire perimeter of the

institution

  

8

Project Allocation

1,200,000

9

(Base Project Allocation - $960,000)

  

10

(Design and Contingencies - $240,000)

  

11

(xiii)  State Correctional Institution at Muncy

  

12

13

(A)  Install new 2,500 watt emergency

generator and switchgear

  

14

Project Allocation

4,300,000

15

(Base Project Allocation - $3,440,000)

  

16

(Design and Contingencies - $860,000)

  

17

(xiv)  State Correctional Institution at Retreat

  

18

19

20

(A)  Replace buried perimeter intrusion

system around entire perimeter of the

institution

  

21

Project Allocation

1,000,000

22

(Base Project Allocation - $800,000)

  

23

(Design and Contingencies - $200,000)

  

24

(xv)  State Correctional Institution at Rockview

  

25

26

27

(A)  Replace the Del Norte perimeter

intrusion system around entire perimeter

of the institution

  

28

Project Allocation

1,092,000

29

(Base Project Allocation - $874,000)

  

30

(Design and Contingencies - $218,000)

  

- 16 -

 


1

2

(B)  Repair or replace exterior on numerous

buildings throughout the institution

  

3

Project Allocation

2,100,000

4

(Base Project Allocation - $1,680,000)

  

5

(Design and Contingencies - $420,000)

  

6

7

(xvi)  State Correctional Institution at

Smithfield

  

  

8

9

10

11

(A)  Additional funding for DGS project

1573-10, renovation of boiler plant, for

current boilers to meet EPA air quality

standards

  

12

Project Allocation

3,000,000

13

(Base Project Allocation - $2,400,000)

  

14

(Design and Contingencies - $600,000)

  

15

16

(xvii)  State Correctional Institution at

Somerset

  

17

18

(A)  Replace roofs on various buildings

throughout the institution

  

19

Project Allocation

2,800,000

20

(Base Project Allocation - $2,240,000)

  

21

(Design and Contingencies - $560,000)

  

22

23

24

(B)  Lease and/or purchase an emergency

housing facility, including related

infrastructure improvements

  

25

Project Allocation

3,500,000

26

(Base Project Allocation - $3,500,000)

  

27

28

(xviii)  State Correctional Institution at

Waymart

  

29

30

(A)  Replace current lines and steam traps

in housing basement

  

- 17 -

 


1

Project Allocation

3,640,000

2

(Base Project Allocation - $2,912,000)

  

3

(Design and Contingencies - $728,000)

  

4

5

(B)  Provide additional funding for DGS

Project 1578-7, renovate boiler plant

  

6

Project Allocation

4,000,000

7

(Base Project Allocation - $3,200,000)

  

8

(Design and Contingencies - $800,000)

  

9

(xix)  Quehanna Motivational Boot Camp

  

10

11

12

(A)  Replace existing rubber roof, add

insulation and provide sloping for

drainage for Building D

  

  

  

13

Project Allocation

1,200,000

14

(Base Project Allocation - $960,000)

  

15

(Design and Contingencies - $240,000)

  

16

(xx)  Department of Corrections

  

17

18

19

20

21

22

23

24

(A)  Purchase of eight modular housing units

at the following State correctional

institutions - Cambridge Springs,

Greensburg, Houtzdale, Laurel Highlands,

Mahanoy, Pine Grove and Rockview (2) -

which were constructed using proceeds

from the 2009 certificates of

participation

  

  

  

  

  

  

  

  

25

Project Allocation

23,000,000

26

(xxi)  Elizabethtown Training Academy

  

27

(A)  Replace roof on Elder Hall

  

28

Project Allocation

2,200,000

29

(Base Project Allocation - $1,760,000)

  

30

(Design and Contingencies - $440,000)

  

- 18 -

 


1

(4)  Department of Education

  

2

3

(i)  Allegheny College of Maryland, Bedford

Campus

  

4

5

6

7

(A)  Construction of new facility and

capital improvements to existing

facility, including infrastructure and

other related costs

  

8

Project Allocation

5,750,000

9

(ii)  Butler County Community College

  

10

11

12

(A)  Construction, redevelopment and other

related costs for Linden Pointe Campus

improvements

  

13

Project Allocation

525,000

14

(iii)  Community College of Beaver

  

15

16

17

(A)  Construction of an air traffic control

tower simulation library, including

related costs

  

18

Project Allocation

2,000,000

19

(iv)  Erie Community College

  

20

21

(A)  Construction of the Erie Community

College, including related costs

  

22

Project Allocation

11,000,000

23

(v)  Lehigh Carbon Community College

  

24

25

(A)  Construction, infrastructure and other

related costs for the Carbon site

  

26

Project Allocation

4,000,000

27

28

29

(B)  Construction of a veterinary technology

lab and veterinary clinic in cooperation

with the Lehigh Valley Zoo

  

30

Project Allocation

2,500,000

- 19 -

 


1

2

3

(C)  Construction of a Communiversity Center

for Lehigh Carbon Community College,

including related costs

  

4

Project Allocation

1,300,000

5

(vi)  Lincoln University

  

6

7

8

9

(A)  Completely renovate Vail Hall to meet

modern needs, including ADA

requirements, HVAC, security system and

electronic access

  

10

Project Allocation

15,000,000

11

(Base Project Allocation - $12,000,000)

  

12

(Design and Contingencies - $3,000,000)

  

13

14

15

(B)  Renovate Lincoln Hall to accommodate

public relations/communications and

human resources departments

  

16

Project Allocation

20,000,000

17

(Base Project Allocation - $16,000,000)

  

18

(Design and Contingencies - $4,000,000)

  

19

20

21

22

(C)  Renovate and expand Azikiwe-Nkrumah

Hall to house Department of Public

Safety and Security and University

Visitors' Information Center

  

23

Project Allocation

7,000,000

24

(Base Project Allocation - $5,600,000)

  

25

(Design and Contingencies - $1,400,000)

  

26

27

28

(D)  Renovate Cresson Hall to meet modern

needs, including ADA requirements, HVAC,

security system and electronic access

  

29

Project Allocation

20,000,000

30

(Base Project Allocation - $16,000,000)

  

- 20 -

 


1

(Design and Contingencies - $4,000,000)

  

2

(vii)  The Pennsylvania State University

  

3

4

5

6

(A)  Renovate Henning Building/Chemical

Ecology Laboratories, including upgrades

to systems to bring them to current

facility standards

  

7

Project Allocation

23,000,000

8

(Base Project Allocation - $19,167,000)

  

9

(Design and Contingencies - $3,833,000)

  

10

11

12

(B)  Renovate Chemical Building, including

laboratories, support spaces, classrooms

and office spaces to meet modern codes

  

13

Project Allocation

19,700,000

14

(Base Project Allocation - $15,760,000)

  

15

(Design and Contingencies - $3,940,000)

  

16

17

18

19

(C)  Renovate university emergency radio

network and infrastructure in

conjunction with regional and county

governments and emergency responders

  

20

Project Allocation

2,500,000

21

(Base Project Allocation - $2,000,000)

  

22

(Design and Contingencies - $500,000)

  

23

(viii)  University of Pittsburgh

  

24

25

26

(A)  Renovate Thaw Hall, Allen Hall,

Engineering Hall, Space Research and

Nuclear Physics as one research

  

27

complex, including infrastructure

  

28

Project Allocation

20,000,000

29

(Base Project Allocation - $16,000,000)

  

30

(Design and Contingencies - $4,000,000)

  

- 21 -

 


1

2

3

(B)  Renovate Fisher Hall, Bradford Campus,

including infrastructure, to address

current building and life safety codes

  

4

Project Allocation

5,000,000

5

(Base Project Allocation - $4,000,000)

  

6

(Design and Contingencies - $1,000,000)

  

7

(ix)  Temple University

  

8

9

10

(A)  Renovate an existing building with

dedicated learning space, faculty and

administration of the Honors Program

  

11

Project Allocation

30,000,000

12

(Base Project Allocation - $24,000,000)

  

13

(Design and Contingencies - $6,000,000)

  

14

15

16

17

18

(B)  Land acquisition, construction,

redevelopment and renovation necessary

for The Medical School of Temple

University and St. Luke's Hospital and

Health Network

  

19

Project Allocation

20,000,000

20

(x)  Department of Education Headquarters

  

21

22

23

24

(A)  Improve and upgrade three floors of the

Department of Education headquarters

building at 333 Market Street,

Harrisburg

  

25

Project Allocation

1,500,000

26

(Base Project Allocation - $1,200,000)

  

27

(Design and Contingencies - $300,000)

  

28

(5)  Department of Environmental Protection

  

29

(i)  Allegheny County

  

30

(A)  Provide additional funds for DGS

  

- 22 -

 


1

2

3

Project 184-33, construct debris basin,

concrete channel and box culvert in

Borough of Pitcairn

4

Project Allocation

6,000,000

5

(Base Project Allocation - $5,000,000)

  

6

(Design and Contingencies - $1,000,000)

  

7

8

9

10

(B)  Provide additional funds for DGS

Project 183-13, remove deteriorated

concrete culvert and replace with open

channel in City of Pittsburgh

  

11

Project Allocation

9,600,000

12

(Base Project Allocation - $8,000,000)

  

13

(Design and Contingencies - $1,600,000)

  

14

15

16

17

(C)  Construction of a regional flood

protection facility in the area of Lower

Allison Park, including acquisition and

other related costs

  

18

Project Allocation

3,700,000

19

(ii)  Cambria County

  

20

21

22

23

24

25

(A)  Provide additional funds for DGS

Project 183-19, construct a compacted

earth levee system along South Fork of

Little Conemaugh River and a rectangular

channel along Otto Run in Townships of

Adams and Croyle

  

26

Project Allocation

7,200,000

27

(Base Project Allocation - $6,000,000)

  

28

(Design and Contingencies - $1,200,000)

  

29

30

(B)  Construct active mine drainage

treatment facility, including

  

- 23 -

 


1

infrastructure, in Cresson

2

Project Allocation

4,000,000

3

(Base Project Allocation - $4,000,000)

  

4

(iii)  Clearfield County

  

5

6

7

8

(A)  Provide additional funds for DGS

Project 182-22, replace culvert with

larger structure to carry flood flow in

Borough of Clearfield

  

9

Project Allocation

2,400,000

10

(Base Project Allocation - $2,000,000)

  

11

(Design and Contingencies - $400,000)

  

12

13

14

15

16

(iv)  Crawford County

(A)  Provide additional funds for DGS

Project 183-16, divert Church Run flows

on an alignment directly to Oil Creek in

City of Titusville

  

17

Project Allocation

7,200,000

18

(Base Project Allocation - $6,000,000)

  

19

(Design and Contingencies - $1,200,000)

  

20

(v)  Dauphin County

  

21

(A)  Purchase laboratory building

  

22

Project Allocation

40,000,000

23

(Base Project Allocation - $40,000,000)

  

24

(vi)  Delaware County

  

25

26

27

28

29

(A)  Rebuild a Marple Township storm sewer

pipe and open culvert and stabilize

creek bank along Darby Creek, including

construction, infrastructure and other

related costs

  

30

Project Allocation

110,000

- 24 -

 


1

(vii)  Fulton County

  

2

3

4

5

(A)  Construct two stream channels which

currently discharge into an abandoned

mine surface mine pit and an abandoned

deep mine in Wells

  

6

Project Allocation

1,200,000

7

(Base Project Allocation - $1,200,000)

  

8

(viii)  Indiana County

  

9

10

11

(A)  Construct active mine drainage

treatment facility, including

infrastructure, in Buffington

  

12

Project Allocation

3,000,000

13

(Base Project Allocation - $3,000,000)

  

14

(ix)  Lackawanna County

  

15

16

17

18

19

20

(A)  Provide additional funds for DGS

Project 184-22, construct concrete

rectangle channel, concrete box culvert

and concrete pipe along Meadow Brook to

upstream Jefferson Avenue in City of

Scranton

  

21

Project Allocation

12,000,000

22

(Base Project Allocation - $10,000,000)

  

23

(Design and Contingencies - $2,000,000)

  

24

(x)  Luzerne County

  

25

26

27

28

(A)  Provide additional funds for DGS

Project 181-20, replace inadequate and

deteriorating culvert along Sulfur Run

in Borough of Ashley

  

29

Project Allocation

2,400,000

30

(Base Project Allocation - $2,000,000)

  

- 25 -

 


1

(Design and Contingencies - $400,000)

  

2

3

4

5

(B)  Provide additional funds for DGS

Project 181-13, replace Roberts Street

Bridge and improve channel along Newport

Creek in Borough of Newport

  

6

Project Allocation

3,600,000

7

(Base Project Allocation - $3,000,000)

  

8

(Design and Contingencies - $600,000)

  

9

10

11

12

13

14

15

16

(C)  Plymouth Flood Control Project, to

include removing a portion of the Brown

Creek debris basin embankment,

addressing subsurface problems,

reconstructing embankment, removing

accumulated sediment within basin area,

rehabilitating concrete inlet structure

and improving the trash rack

  

17

Project Allocation

2,400,000

18

(Base Project Allocation - $2,000,000)

  

19

(Design and Contingencies - $400,000)

  

20

21

22

(D)  Provide additional funds for DGS

Project 181-23, replace deteriorating

culvert in Borough of Yatesville

  

23

Project Allocation

2,400,000

24

(Base Project Allocation - $2,000,000)

  

25

(Design and Contingencies - $400,000)

  

26

(xi)  McKean County

  

27

28

29

(A)  Additional funds for DGS project

182-0010, flood protection, Port

Allegany Borough

  

30

Project Allocation

8,030,000

- 26 -

 


1

(Base Project Allocation - $6,500,000)

  

2

(Design and Contingencies - $1,530,000)

  

3

4

5

6

(B)  Provide additional funds for DGS

Project 182-10, renovate existing

compacted earth levee and construct new

levee along Allegheny River

  

7

Project Allocation

16,800,000

8

(Base Project Allocation - $14,000,000)

  

9

(Design and Contingencies - $2,800,000)

  

10

(xii)  Montgomery County

  

11

12

13

14

15

16

(A)  Construct a regional flood control

basin within the Stuart Farm Creek/Honey

Run watershed area to reduce downstream

flooding, including a downstream

channel, culvert, drainage improvements,

infrastructure and other related costs

  

17

Project Allocation

3,250,000

18

19

20

21

(B)  Upgrade portions of storm sewer in the

Borough of Hatboro to allow for improved

drainage, including acquisition,

construction and other related costs

  

22

Project Allocation

3,000,000

23

24

25

26

(C)  Construct storm water control

facilities and other related costs for

Kohler Park and Park Creek flood control

project

  

27

Project Allocation

1,500,000

28

(xiii)  Northumberland County

  

29

30

(A)  Provide additional funds for DGS

Project 182-18, construct concrete

  

- 27 -

 


1

2

rectangle channel along Shamokin Creek

through the Borough of Mount Carmel

3

Project Allocation

4,800,000

4

(Base Project Allocation - $4,000,000)

  

5

(Design and Contingencies - $800,000)

  

6

7

8

9

10

(B)  Provide additional funds for DGS

Project 182-18, construct a concrete

rectangle channel along Butternut Creek

and contain flood flows from storm water

culvert in Township of Mount Carmel

  

11

Project Allocation

2,400,000

12

(Base Project Allocation - $2,000,000)

  

13

(Design and Contingencies - $400,000)

  

14

(6)  Department of General Services

  

15

(i)  Dauphin County

  

16

17

(A)  Remove and replace existing roof on

Agriculture Building

  

18

Project Allocation

1,040,000

19

(Base Project Allocation - $800,000)

  

20

(Design and Contingencies - $240,000)

  

21

22

(B)  Replace roof on Capitol East Wing

Building

  

23

Project Allocation

650,000

24

(Base Project Allocation - $500,000)

  

25

(Design and Contingencies - $150,000)

  

26

27

28

(C)  Complete renovation of Roman fountain

in the Capitol East Wing, including

wiring lighting fixtures and controls

  

29

Project Allocation

400,000

30

(Base Project Allocation - $300,000)

  

- 28 -

 


1

(Design and Contingencies - $100,000)

  

2

3

4

(D)  Install sprinkler system and upgrade

fire panels, including enunciators, at

Central Plant

  

5

Project Allocation

650,000

6

(Base Project Allocation - $500,000)

  

7

(Design and Contingencies - $150,000)

  

8

9

10

(E)  Upgrade heating systems and install

central air conditioning in occupied

buildings in the DGS Annex Complex

  

11

Project Allocation

3,750,000

12

(Base Project Allocation - $3,750,000)

  

13

14

15

(F)  Replace and upgrade steam plant to DGS

Annex Complex, including pneumatic

controls and burners

  

16

Project Allocation

1,563,000

17

(Base Project Allocation - $1,563,000)

  

18

19

20

21

(G)  Replace 124 ceiling-mounted heat pumps

and eight heating units to a centralized

format with new ductwork in the DGS

Annex Complex

  

22

Project Allocation

5,940,000

23

(Base Project Allocation - $5,940,000)

  

24

25

26

27

(H)  Upgrade electrical distribution system

and replace fire and security system

throughout the buildings in the DGS

Annex Complex

  

  

  

  

28

Project Allocation

3,600,000

29

(Base Project Allocation - $3,600,000)

  

30

(I)  Remediate mold, asbestos and other

  

- 29 -

 


1

2

3

hazardous material items in buildings

and equipment areas in the DGS Annex

Complex

4

Project Allocation

6,750,000

5

(Base Project Allocation - $5,625,000)

  

6

(Design and Contingencies - $1,125,000)

  

7

8

9

(J)  Install sprinkler system and upgrade

fire panels, including enunciators, in

the Finance Office Building

  

10

Project Allocation

520,000

11

(Base Project Allocation - $400,000)

  

12

(Design and Contingencies - $120,000)

  

13

14

(K)  Install HVAC from the central plant to

the entire Finance Office Building

  

15

Project Allocation

13,000,000

16

(Base Project Allocation - $10,000,000)

  

17

(Design and Contingencies - $3,000,000)

  

18

19

20

(L)  Renovate restrooms, including

replacement of fixtures, in the Finance

Office Building

  

21

Project Allocation

1,300,000

22

(Base Project Allocation - $1,000,000)

  

23

(Design and Contingencies - $300,000)

  

24

25

(M)  Replace and install interior central

plant steam lines in Forum Building

  

26

Project Allocation

2,600,000

27

(Base Project Allocation - $2,000,000)

  

28

(Design and Contingencies - $600,000)

  

29

30

(N)  Insulate chilled water lines in Irvis

Office Building

  

  

- 30 -

 


1

Project Allocation

650,000

2

(Base Project Allocation - $500,000)

  

3

(Design and Contingencies - $150,000)

  

4

5

6

(O)  Install sprinkler system and upgrade

fire panels, including enunciators, in

the Irvis Office Building

  

7

Project Allocation

1,300,000

8

(Base Project Allocation - $1,000,000)

  

9

(Design and Contingencies - $300,000)

  

10

11

12

(P)  Clean, seal and sanitize HVAC system

and ductwork in the Irvis Office

Building

  

13

Project Allocation

520,000

14

(Base Project Allocation - $400,000)

  

15

(Design and Contingencies - $120,000)

  

16

17

18

(Q)  Renovate elevators, including repair

and replacement of cabs, carpeting and

motors in the Irvis Office Building

  

19

Project Allocation

910,000

20

(Base Project Allocation - $700,000)

  

21

(Design and Contingencies - $210,000)

  

22

23

24

(R)  Clean, seal and sanitize HVAC system

and ductwork in the Labor and Industry

Building

  

25

Project Allocation

520,000

26

(Base Project Allocation - $400,000)

  

27

(Design and Contingencies - $120,000)

  

28

29

30

(S)  Update and renovate all elevators and

chair lifts in the Labor and Industry

Building

  

- 31 -

 


1

Project Allocation

575,000

2

(Base Project Allocation - $500,000)

  

3

(Design and Contingencies - $75,000)

  

4

5

(T)  Insulate chilled water lines in North

Office Building

  

6

Project Allocation

650,000

7

(Base Project Allocation - $500,000)

  

8

(Design and Contingencies - $150,000)

  

9

10

11

(U)  Install sprinkler system and upgrade

fire panels, including enunciators, in

the North Office Building

  

12

Project Allocation

1,040,000

13

(Base Project Allocation - $800,000)

  

14

(Design and Contingencies - $240,000)

  

15

16

17

(V)  Clean, seal and sanitize HVAC system

and ductwork in the North Office

Building

  

18

Project Allocation

520,000

19

(Base Project Allocation - $400,000)

  

20

(Design and Contingencies - $120,000)

  

21

22

23

24

25

(W)  Repair drainage system, deck joints,

all spalls, sidewalks, curbs and

barrier; blast clean, spot paint and

install diaphragms between joists at the

State Street Bridge

  

26

Project Allocation

3,329,000

27

(Base Project Allocation - $2,561,000)

  

28

(Design and Contingencies - $768,000)

  

29

30

(X)  Renovate the 10th and Market Street

Building, including windows, HVAC, roof

  

- 32 -

 


1

2

and exterior masonry to utilize building

as office space

3

Project Allocation

6,500,000

4

(Base Project Allocation - $5,000,000)

  

5

(Design and Contingencies - $1,500,000)

  

6

(ii)  Lackawanna County

  

7

8

9

10

(A)  Replace all windows throughout the

Scranton State Office Building for

reduced maintenance and higher

efficiency

  

11

Project Allocation

455,000

12

(Base Project Allocation - $350,000)

  

13

(Design and Contingencies - $105,000)

  

14

(7)  Pennsylvania Historical and Museum Commission

  

15

(i)  Daniel Boone Homestead

  

16

17

18

19

(A)  Upgrade sewage treatment and other

infrastructure including HVAC systems

with geothermal systems and other

energy-saving equipment

  

  

  

  

20

Project Allocation

9,600,000

21

(Base Project Allocation - $8,000,000)

  

22

(Design and Contingencies - $1,600,000)

  

23

(ii)  Eckley Miners' Village

  

24

25

26

27

(A)  Upgrade sewage treatment and other

infrastructure including HVAC systems

with geothermal systems and other

energy-saving equipment

  

28

Project Allocation

4,800,000

29

(Base Project Allocation - $4,000,000)

  

30

(Design and Contingencies - $800,000)

  

- 33 -

 


1

(iii)  Ephrata Cloister

  

2

3

4

(A)  Upgrade HVAC systems with geothermal

systems and other energy-saving

equipment

  

5

Project Allocation

2,400,000

6

(Base Project Allocation - $2,000,000)

  

7

(Design and Contingencies - $400,000)

  

8

(iv)  Erie Maritime Museum

  

9

10

11

12

(A)  Renovate US Brig Niagara including

hull, rigging and equipment and

partially replace masts, planking and

standing rigging

  

13

Project Allocation

4,800,000

14

(Base Project Allocation - $4,000,000)

  

15

(Design and Contingencies - $800,000)

  

16

17

18

(B)  Renovate and repair building, including

masonry repairs, waterproofing, water

management and other repairs

  

19

Project Allocation

1,200,000

20

(Base Project Allocation - $1,200,000)

  

21

(v)  Fort Pitt Museum

  

22

23

24

25

(A)  Renovate first floor museum including

replacement and expansion of restrooms,

visitors' center and office and exterior

improvements

  

26

Project Allocation

6,000,000

27

(Base Project Allocation - $5,000,000)

  

28

(Design and Contingencies - $1,000,000)

  

29

(vi)  Landis Valley Museum

  

30

(A)  Upgrade sewage, water, electrical,

  

- 34 -

 


1

2

3

4

phone, data and fire and security lines

and other infrastructure including HVAC

systems with geothermal systems and

other energy-saving equipment

5

Project Allocation

9,000,000

6

(Base Project Allocation - $7,500,000)

  

7

(Design and Contingencies - $1,500,000)

  

8

9

10

(B)  Prepare Bitzer Barn for exhibits

reflecting the site, including

infrastructure

  

11

Project Allocation

3,000,000

12

(Base Project Allocation - $3,000,000)

  

13

(vii)  Pennsbury Manor

  

14

15

16

(A)  Upgrade HVAC systems with geothermal

systems and other energy-saving

equipment

  

17

Project Allocation

3,600,000

18

(Base Project Allocation - $3,000,000)

  

19

(Design and Contingencies - $600,000)

  

20

(viii)  Pennsylvania Anthracite Heritage Museum

  

21

22

23

24

(A)  Upgrade sewage treatment and other

infrastructure including HVAC systems

with geothermal systems and other

energy-saving equipment

  

25

Project Allocation

2,400,000

26

(Base Project Allocation - $2,000,000)

  

27

(Design and Contingencies - $400,000)

  

28

(ix)  Pennsylvania Military Museum

  

29

30

(A)  Upgrade HVAC systems with geothermal

systems and other energy-saving

  

- 35 -

 


1

equipment

2

Project Allocation

3,600,000

3

(Base Project Allocation - $3,000,000)

  

4

(Design and Contingencies - $600,000)

  

5

(x)  Railroad Museum of Pennsylvania

  

6

7

8

(A)  Upgrade HVAC systems with geothermal

systems and other energy-saving

equipment

  

9

Project Allocation

4,800,000

10

(Base Project Allocation - $4,000,000)

  

11

(Design and Contingencies - $800,000)

  

12

13

14

(B)  Design and construct new rolling stock

storage facility and railroad transfer

table with appropriate infrastructure

  

15

Project Allocation

12,000,000

16

(Base Project Allocation - $12,000,000)

  

17

(xi)  Somerset Historical Center

  

18

19

20

21

(A)  Upgrade sewage treatment and other

infrastructure including HVAC systems

with geothermal systems and other

energy-saving equipment

  

  

  

  

22

Project Allocation

2,400,000

23

(Base Project Allocation - $2,000,000)

  

24

(Design and Contingencies - $400,000)

  

25

(xii)  Washington Crossing Historic Park

  

26

27

28

29

(A)  Upgrade sewage treatment and other

infrastructure including HVAC systems

with geothermal systems and other

energy-saving equipment

  

30

Project Allocation

9,600,000

- 36 -

 


1

(Base Project Allocation - $8,000,000)

  

2

(Design and Contingencies - $1,600,000)

  

3

4

5

6

(B)  Addition to Washington Crossing

Historic Park Visitor's Center,

including construction and other related

costs

  

7

Project Allocation

1,000,000

8

(8)  Department of Military and Veterans Affairs

  

9

10

(i)  Combined Surface Maintenance Shop West,

Pittsburgh, Allegheny County

  

  

11

12

13

14

(A)  Consolidate three field maintenance

shops in the region into one unit with

unheated storage facilities, parking

facilities and infrastructure

  

15

Project Allocation

2,000,000

16

(Base Project Allocation - $1,800,000)

  

17

(Design and Contingencies - $200,000)

  

18

19

(ii)  Southwestern Veterans' Center, Allegheny

County

  

  

20

21

22

23

24

25

(A)  Provide for renovation and general

repairs of veterans' center including

patio enclosure, facility chiller

replacement, perimeter fencing, facility

flooring and expansion and replacement

of existing parking lot

  

26

Project Allocation

2,750,000

27

(Base Project Allocation - $2,200,000)

  

28

(Design and Contingencies - $550,000)

  

29

30

(B)  Provide for renovation and general

repairs of veterans' center, including

  

- 37 -

 


1

replacement of facility roof

2

Project Allocation

750,000

3

(Base Project Allocation - $600,000)

  

4

(Design and Contingencies - $150,000)

  

5

6

(iii)  Beaver Falls Readiness Center, Beaver

County

  

7

8

9

10

11

12

13

14

(A)  Rehabilitate Beaver Falls Readiness

Center, including assembly hall,

classrooms, administrative offices,

storage spaces, rest rooms, locker rooms

and mechanical rooms; upgrade building

systems, including HVAC, roofs, windows

and doors; repair facade; expand parking

and construct unheated storage facility

  

15

Project Allocation

4,300,000

16

(Base Project Allocation - $3,700,000)

  

17

(Design and Contingencies - $600,000)

  

18

(iv)  Everett Readiness Center, Bedford County

  

19

20

(A)  Additional funding for construction of

National Guard readiness center

  

21

Project Allocation

4,000,000

22

(Base Project Allocation - $3,200,000)

  

23

(Design and Contingencies - $800,000)

  

24

(v)  Hamburg Readiness Center, Berks County

  

25

26

27

28

29

30

(A)  Rehabilitate Hamburg Readiness Center,

including assembly hall, classrooms,

administrative offices, storage spaces,

rest rooms, locker rooms and mechanical

rooms; upgrade building systems,

including HVAC, roofs, windows and

  

- 38 -

 


1

2

doors; repair facade; expand parking and

construct unheated storage facility

3

Project Allocation

2,300,000

4

(Base Project Allocation - $2,000,000)

  

5

(Design and Contingencies - $300,000)

  

6

(vi)  Hollidaysburg Veterans' Home, Blair County

  

7

8

9

10

11

12

(A)  Provide for renovation and general

repairs of veterans' home including

upgrading electrical system and plumbing

in MacArthur Hall, upgrading HVAC, roof

replacement, life safety project and

dietary tray system

  

13

Project Allocation

4,170,000

14

(Base Project Allocation - $3,336,000)

  

15

(Design and Contingencies - $834,000)

  

16

17

18

19

20

21

(B)  Provide for renovation and general

repairs of veterans' home to include

design and upgrade of community living

center at Eisenhower Hall and

construction of meal delivery systems at

Arnold and Eisenhower Halls

  

22

Project Allocation

1,000,000

23

(Base Project Allocation - $800,000)

  

24

(Design and Contingencies - $200,000)

  

25

26

(vii)  Bradford/Wyoming Readiness Center,

Bradford County

  

27

28

29

30

(A)  Construct National Guard Readiness

Center, including assembly hall, dining

facility, classrooms, administrative

offices, storage space, rest rooms,

  

- 39 -

 


1

2

locker rooms and parking and renovate

existing facility

3

Project Allocation

5,651,000

4

(Base Project Allocation - $3,500,000)

  

5

(Land Allocation - $1,500,000)

  

6

(Design and Contingencies - $651,000)

  

7

8

(viii)  Johnstown Readiness Center, Cambria

County

  

9

10

11

12

13

14

15

16

(A)  Rehabilitate Johnstown Readiness

Center, including assembly hall,

classrooms, administrative offices,

storage spaces, rest rooms, locker rooms

and mechanical rooms; upgrade building

systems, including HVAC, roofs, windows

and doors; repair facade; expand parking

and construct unheated storage facility

  

17

Project Allocation

4,300,000

18

(Base Project Allocation - $3,800,000)

  

19

(Design and Contingencies - $500,000)

  

20

(ix)  Carbondale Readiness Center, Carbon County

  

21

22

23

24

25

26

27

28

(A)  Rehabilitate Carbondale Readiness

Center, including assembly hall,

classrooms, administrative offices,

storage spaces, rest rooms, locker rooms

and mechanical rooms; upgrade building

systems, including HVAC, roofs, windows

and doors; repair facade; expand parking

and construct unheated storage facility

  

29

Project Allocation

2,700,000

30

(Base Project Allocation - $2,200,000)

  

- 40 -

 


1

(Design and Contingencies - $500,000)

  

2

(x)  Lehighton Readiness Center, Carbon County

  

3

4

5

6

7

8

9

10

(A)  Rehabilitate Lehighton Readiness

Center, including assembly hall,

classrooms, administrative offices,

storage spaces, rest rooms, locker rooms

and mechanical rooms; upgrade building

systems, including HVAC, roofs, windows

and doors; repair facade; expand parking

and construct unheated storage facility

  

11

Project Allocation

2,700,000

12

(Base Project Allocation - $2,400,000)

  

13

(Design and Contingencies - $300,000)

  

14

15

(xi)  Phoenixville Readiness Center, Chester

County

  

16

17

18

19

20

21

22

(A)  Rehabilitate Phoenixville Readiness

Center, including assembly hall,

classrooms, administrative offices,

storage spaces, rest rooms, locker rooms

and mechanical rooms; upgrade building

systems, including HVAC, roofs, windows

and doors and repair facade

  

23

Project Allocation

5,000,000

24

(Base Project Allocation - $4,200,000)

  

25

(Design and Contingencies - $800,000)

  

26

27

(xii)  Southeastern Veterans' Home, Chester

County

  

28

29

30

(A)  Provide for renovation and general

repairs of veterans' center to include

upgrades and renovations at Coates Hall

  

- 41 -

 


1

2

and construction of new maintenance

building

3

Project Allocation

7,000,000

4

(Base Project Allocation - $5,600,000)

  

5

(Design and Contingencies - $1,400,000)

  

6

7

(xiii)  Clearfield Readiness Center, Clearfield

County

  

  

8

9

(A)  Construct National Guard readiness

center

  

10

Project Allocation

6,000,000

11

(Base Project Allocation - $5,200,000)

  

12

(Design and Contingencies - $800,000)

  

13

(xiv)  Hershey Readiness Center, Dauphin County

  

14

15

16

17

18

19

20

21

(A)  Rehabilitate Hershey Readiness Center,

including assembly hall, classrooms,

administrative offices, storage spaces,

rest rooms, locker rooms and mechanical

rooms; upgrade building systems,

including HVAC, roofs, windows and

doors; repair facade; expand parking and

construct unheated storage facility

  

22

Project Allocation

2,500,000

23

(Base Project Allocation - $2,200,000)

  

24

(Design and Contingencies - $300,000)

  

25

26

(xv)  Williamstown Readiness Center, Dauphin

County

  

27

28

29

30

(A)  Rehabilitate Williamstown Readiness

Center, including assembly hall,

classrooms, administrative offices,

storage spaces, rest rooms, locker rooms

  

- 42 -

 


1

2

3

4

and mechanical rooms; upgrade building

systems, including HVAC, roofs, windows

and doors; repair facade; expand parking

and construct unheated storage facility

5

Project Allocation

3,000,000

6

(Base Project Allocation - $2,600,000)

  

7

(Design and Contingencies - $400,000)

  

8

(xvi)  Erie Readiness Center, Erie County

  

9

10

(A)  Construct National Guard readiness

center

  

11

Project Allocation

5,000,000

12

(Base Project Allocation - $4,200,000)

  

13

(Design and Contingencies - $800,000)

  

14

15

(xvii)  Pennsylvania Soldiers' and Sailors'

Home, Erie County

  

  

16

17

18

19

20

(A)  Provide for renovation and general

repairs of veterans' home including

replacement of PCU fan coil units, NCU

rolled rubber roof and PCU metal roof

installation

  

  

  

  

  

21

Project Allocation

1,470,000

22

(Base Project Allocation - $1,176,000)

  

23

(Design and Contingencies - $294,000)

  

24

25

26

(B)  Provide for renovation and general

repairs of veterans' home, including

life safety and regulatory deficiencies

  

27

Project Allocation

500,000

28

(Base Project Allocation - $400,000)

  

29

(Design and Contingencies - $100,000)

  

30

(xviii)  Waynesburg Readiness Center, Greene

  

- 43 -

 


1

County

2

3

4

5

6

7

(A)  Provide additional funds to construct

National Guard readiness center,

including assembly hall, dining

facility, classrooms, administrative

offices, storage space, rest rooms,

locker rooms and mechanical room

  

8

Project Allocation

856,000

9

(Base Project Allocation - $698,000)

  

10

(Design and Contingencies - $158,000)

  

11

12

(xix)  Gino J. Merli Veterans' Center,

Lackawanna County

  

  

13

14

15

16

17

(A)  Provide for renovation and general

repairs to veterans' center, including

food preparation and dietary systems

change, facility roof repair and 155-

ton water-cooled screw chiller

  

18

Project Allocation

300,000

19

(Base Project Allocation - $240,000)

  

20

(Design and Contingencies - $60,000)

  

21

22

23

(B)  Provide for renovation and general

repairs of veterans' center, including

life safety and regulatory deficiencies

  

24

Project Allocation

500,000

25

(Base Project Allocation - $400,000)

  

26

(Design and Contingencies - $100,000)

  

27

(xx)  Marquette Lake Dam, Lebanon County

  

28

29

30

(A)  Renovate Marquette Lake Dam including

armoring the breast of the dam with

roller compacted concrete to preserve

  

- 44 -

 


1

2

3

4

5

all desirable effects of the lake,

military training, flood control,

sediment retention, firefighting and

public recreation and to provide the

required level of safety

6

Project Allocation

8,000,000

7

(Base Project Allocation - $7,500,000)

  

8

(Design and Contingencies - $500,000)

  

9

10

(xxi)  Nanticoke Readiness Center, Luzerne

County

  

11

(A)  Renovate Nanticoke Readiness Center

  

12

Project Allocation

5,000,000

13

(Base Project Allocation - $4,200,000)

  

14

(Design and Contingencies - $800,000)

  

15

(xxii)  Fort Indiantown Gap, Lebanon County

  

16

17

18

19

20

21

(A)  Acquisition of privately owned lands

within the boundaries of the Fort

Indiantown Gap installation to support

the training and activities of the

installation and for the benefit of the

Pennsylvania military forces

  

22

Project Allocation

1,500,000

23

(Land Allocation - $1,500,000)

  

24

25

26

27

(B)  Purchase in-holdings on Fort Indiantown

Gap property and/or surrounding property

as part of Joint Land Use Agreement and

Army Compatibility Use Buffers

  

28

Project Allocation

4,000,000

29

(Land Allocation - $4,000,000)

  

30

(xxiii)  Field Maintenance Shop,

  

- 45 -

 


1

Lycoming/Montour County

2

3

4

5

6

(A)  Construct National Guard field

maintenance shop, including work bays,

electronics shop, small arms repair

shop, tool and supply, administrative

areas and parking facilities

  

7

Project Allocation

3,900,000

8

(Base Project Allocation - $2,000,000)

  

9

(Land Allocation - $1,500,000)

  

10

(Design and Contingencies - $400,000)

  

11

12

(xxiv)  Grove City Readiness Center, Mercer

County

  

13

14

15

16

17

18

19

20

(A)  Rehabilitate Grove City Readiness

Center, including assembly hall,

classrooms, administrative offices,

storage spaces, rest rooms, locker rooms

and mechanical rooms; upgrade building

systems, including HVAC, roofs, windows

and doors; repair facade; expand parking

and construct unheated storage facility

  

21

Project Allocation

1,800,000

22

(Base Project Allocation - $1,500,000)

  

23

(Design and Contingencies - $300,000)

  

24

25

(xxv)  Horsham Joint Interagency Installation,

Montgomery County

  

26

27

28

29

(A)  Renovate and upgrade Buildings 201,

229, 230, 335, 345, 346 and 348,

including utility service, utility

upgrades and heating

  

30

Project Allocation

2,400,000

- 46 -

 


1

(Base Project Allocation - $2,000,000)

  

2

(Design and Contingencies - $400,000)

  

3

4

5

6

(B)  Install pumping station to reroute

installation's water and sewer lines and

connections with adjacent military

enclave

  

7

Project Allocation

1,250,000

8

(Base Project Allocation - $1,000,000)

  

9

(Design and Contingencies - $250,000)

  

10

11

(C)  Improve water and sewer systems at

installation

  

12

Project Allocation

5,000,000

13

(Base Project Allocation - $4,500,000)

  

14

(Design and Contingencies - $500,000)

  

15

16

17

(D)  Install improvements at Pitcairn-Willow

Grove Air Field, including navigation

aids and instrument landing system

  

18

Project Allocation

3,000,000

19

(Base Project Allocation - $2,000,000)

  

20

(Land Allocation - $500,000)

  

21

(Design and Contingencies - $500,000)

  

22

23

(xxvi)  Delaware Valley Veterans' Home,

Philadelphia County

  

24

25

26

(A)  Provide for renovation and general

repairs of veterans' home, including

life safety and regulatory deficiencies

  

27

Project Allocation

500,000

28

(Base Project Allocation - $400,000)

  

29

(Design and Contingencies - $100,000)

  

30

(xxvii)  Friedens Readiness Center, Somerset

  

- 47 -

 


1

County

2

3

4

5

6

7

8

(A)  Rehabilitate Friedens Readiness Center,

including assembly hall, classrooms,

administrative offices, storage spaces,

rest rooms, locker rooms and mechanical

rooms; upgrade building systems,

including HVAC, roofs, windows and doors

and repair facade

  

9

Project Allocation

2,500,000

10

(Base Project Allocation - $2,200,000)

  

11

(Design and Contingencies - $300,000)

  

12

13

(xxviii)  Lewisburg Readiness Center, Union

County

  

14

15

16

17

18

19

20

21

(A)  Rehabilitate Lewisburg Readiness

Center, including assembly hall,

classrooms, administrative offices,

storage spaces, rest rooms, locker rooms

and mechanical rooms; upgrade building

systems, including HVAC, roofs, windows

and doors; repair facade; expand parking

and construct unheated storage facility

  

22

Project Allocation

5,000,000

23

(Base Project Allocation - $4,300,000)

  

24

(Design and Contingencies - $700,000)

  

25

(xxix)  Honesdale Readiness Center, Wayne County

  

26

27

28

(A)  Renovate existing Honesdale Readiness

Center and upgrade antiterrorism

protection measures

  

29

Project Allocation

4,560,000

30

(Base Project Allocation - $4,000,000)

  

- 48 -

 


1

(Design and Contingencies - $560,000)

  

2

3

(xxx)  Greensburg Readiness Center, Westmoreland

County

  

4

5

6

7

8

9

10

11

(A)  Rehabilitate Greensburg Readiness

Center, including assembly hall,

classrooms, administrative offices,

storage spaces, rest rooms, locker rooms

and mechanical rooms; upgrade building

systems, including HVAC, roofs, windows

and doors; repair facade; expand parking

and construct unheated storage facility

  

12

Project Allocation

2,600,000

13

(Base Project Allocation - $2,200,000)

  

14

(Design and Contingencies - $400,000)

  

15

(xxxi)  York Readiness Center, York County

  

16

17

(A)  Additional funding for construction of

National Guard readiness center

  

  

18

Project Allocation

3,000,000

19

(Base Project Allocation - $2,500,000)

  

20

(Design and Contingencies - $500,000)

  

21

(9)  Department of Public Welfare

  

22

(i)  Allentown State Hospital

  

23

24

(A)  Replace fire control system in hospital

building to meet new standards

  

25

Project Allocation

810,000

26

(Base Project Allocation - $675,000)

  

27

(Design and Contingencies - $135,000)

  

28

(ii)  Clarks Summit State Hospital

  

29

30

(A)  Install energy-efficient heating and

cooling systems for residents' bedrooms

  

- 49 -

 


1

and common areas

2

Project Allocation

2,160,000

3

(Base Project Allocation - $1,800,000)

  

4

(Design and Contingencies - $360,000)

  

5

(iii)  Cresson Secure Treatment Unit

  

6

7

(A)  Install new 400-amp service to meet

current electrical requirements

  

8

Project Allocation

1,440,000

9

(Base Project Allocation - $1,200,000)

  

10

(Design and Contingencies - $240,000)

  

11

(iv)  Danville State Hospital

  

12

13

(A)  Install new 400-amp service to meet

current electrical requirements

  

14

Project Allocation

1,800,000

15

(Base Project Allocation - $1,500,000)

  

16

(Design and Contingencies - $300,000)

  

17

(v)  Ebensburg Center

  

18

19

20

(A)  Complete facility-wide steam and

condensate replacement project to reduce

dependency on local supplier

  

  

  

21

Project Allocation

1,920,000

22

(Base Project Allocation - $1,600,000)

  

23

(Design and Contingencies - $320,000)

  

24

(B)  Replace roofing

  

25

Project Allocation

1,584,000

26

(Base Project Allocation - $1,320,000)

  

27

(Design and Contingencies - $264,000)

  

28

29

(C)  Provide additional funding to

rehabilitate sanitary sewer system

  

30

Project Allocation

156,000

- 50 -

 


1

(Base Project Allocation - $130,000)

  

2

(Design and Contingencies - $26,000)

  

3

(vi)  Loysville Youth Development Center

  

4

5

6

7

(A)  Construct mandated water filtration

system to supplement DGS Project

0588-0009, construction of a water

filtration system

  

8

Project Allocation

594,000

9

(Base Project Allocation - $495,000)

  

10

(Design and Contingencies - $99,000)

  

11

12

(B)  Install new transformers to replace

existing PCB transformers

  

13

Project Allocation

1,800,000

14

(Base Project Allocation - $1,500,000)

  

15

(Design and Contingencies - $300,000)

  

16

17

18

(C)  Construct new activities center,

including site preparation and

associated utilities

  

19

Project Allocation

1,734,000

20

(Base Project Allocation - $1,445,000)

  

21

(Design and Contingencies - $289,000)

  

22

(vii)  Loysville Cresson Secure Treatment Unit

  

23

24

25

(A)  Construct, equip and furnish a multi-

purpose space including classroom, gym

and kitchen facilities

  

26

Project Allocation

2,111,000

27

(Base Project Allocation - $1,776,000)

  

28

(Design and Contingencies - $335,000)

  

29

(viii)  New Castle Youth Development Center

  

30

(A)  Install new HVAC system and associated

  

- 51 -

 


1

control and electrical system

2

Project Allocation

1,188,000

3

(Base Project Allocation - $990,000)

  

4

(Design and Contingencies - $198,000)

  

5

6

7

(B)  Install new HVAC system and associated

control and electrical system in dining

area

  

8

Project Allocation

480,000

9

(Base Project Allocation - $400,000)

  

10

(Design and Contingencies - $80,000)

  

11

(ix)  Norristown State Hospital

  

12

13

14

(A)  Renovate existing absorption steam

chiller necessary for patient health and

safety

  

15

Project Allocation

720,000

16

(Base Project Allocation - $600,000)

  

17

(Design and Contingencies - $120,000)

  

18

19

(B)  Install new HVAC system in building for

patient and worker health

  

20

Project Allocation

2,520,000

21

(Base Project Allocation - $2,100,000)

  

22

(Design and Contingencies - $420,000)

  

23

24

(C)  Install new efficient boilers to

replace leased units

  

25

Project Allocation

840,000

26

(Base Project Allocation - $700,000)

  

27

(Design and Contingencies - $140,000)

  

28

(x)  Polk Center

  

29

30

(A)  Replace deteriorated sections of storm

drains to prevent deterioration of 13

    

  

- 52 -

 


1

building foundations

  

2

Project Allocation

1,440,000

3

(Base Project Allocation - $1,200,000)

  

4

(Design and Contingencies - $240,000)

  

5

6

7

(B)  Install new HVAC system and associated

control and electrical system in dining

area

  

8

Project Allocation

900,000

9

(Base Project Allocation - $750,000)

  

10

(Design and Contingencies - $150,000)

  

11

(xi)  Selinsgrove Center

  

12

13

14

15

(A)  Upgrade and construct water filtration

plant and repipe water tie-ins to

accommodate water filtration plant and

supply facility

  

16

Project Allocation

2,190,000

17

(Base Project Allocation - $1,800,000)

  

18

(Design and Contingencies - $390,000)

  

19

20

21

(B)  Refurbish inside and outside of water

towers, including access ladders and

concrete bases to meet code requirements

  

22

Project Allocation

1,200,000

23

(Base Project Allocation - $1,000,000)

  

24

(Design and Contingencies - $200,000)

  

25

(xii)  South Mountain Restoration Center

  

26

27

28

(A)  Construct, equip and furnish a multi-

purpose space, including classroom, gym

and kitchen facilities

  

29

Project Allocation

1,680,000

30

(Base Project Allocation - $1,400,000)

  

- 53 -

 


1

(Design and Contingencies - $280,000)

  

2

(xiii)  South Mountain Secure Treatment Unit

  

3

4

(A)  Install new HVAC system and associated

control and electrical system

  

5

Project Allocation

4,800,000

6

(Base Project Allocation - $4,000,000)

  

7

(Design and Contingencies - $800,000)

  

8

(xiv)  Torrance State Hospital

  

9

10

11

(A)  Replace and improve heating and air

conditioning for central areas of

Wiseman Building

  

12

Project Allocation

1,560,000

13

(Base Project Allocation - $1,300,000)

  

14

(Design and Contingencies - $260,000)

  

15

16

17

(B)  Provide funds to replace and improve

heating and air conditioning for central

areas of Wiseman Building

  

18

Project Allocation

1,150,000

19

(Base Project Allocation - $1,000,000)

  

20

(Design and Contingencies - $150,000)

  

21

(xv)  Warren State Hospital

  

22

23

(A)  Renovate fire alarm and suppression

system for patient and campus buildings

  

24

Project Allocation

3,000,000

25

(Base Project Allocation - $2,500,000)

  

26

(Design and Contingencies - $500,000)

  

27

(B)  Install modernized roof system

  

28

Project Allocation

720,000

29

(Base Project Allocation - $600,000)

  

30

(Design and Contingencies - $120,000)

  

- 54 -

 


1

(xvi)  Wernersville State Hospital

  

2

3

(A)  Repair Breech Mill Dam breast and

connecting waterway conduits

  

4

Project Allocation

1,560,000

5

(Base Project Allocation - $1,300,000)

  

6

(Design and Contingencies - $260,000)

  

7

(B)  Install modernized roof system

  

8

Project Allocation

480,000

9

(Base Project Allocation - $400,000)

  

10

(Design and Contingencies - $80,000)

  

11

12

(C)  Provide funds to install modernized

roof system

  

13

Project Allocation

390,000

14

(Base Project Allocation - $325,000)

  

15

(Design and Contingencies - $65,000)

  

16

17

18

(D)  Rebuild and reinforce collapsing

utility tunnel system to ensure utility

services

  

19

Project Allocation

420,000

20

(Base Project Allocation - $350,000)

  

21

(Design and Contingencies - $70,000)

  

22

(xvii)  White Haven Center

  

23

24

25

26

(A)  Upgrade heating system in residential

and program buildings from radiant

system to more modern, digitally

controlled, high efficiency HVAC system

  

  

  

  

27

Project Allocation

3,360,000

28

(Base Project Allocation - $2,800,000)

  

29

(Design and Contingencies - $560,000)

  

30

(B)  Replace condensation and steam lines

  

- 55 -

 


1

throughout the center

2

Project Allocation

2,400,000

3

(Base Project Allocation - $2,000,000)

  

4

(Design and Contingencies - $400,000)

  

5

6

7

(C)  Install equipment and materials to

provide water park in place of existing

pool

  

8

Project Allocation

600,000

9

(Base Project Allocation - $500,000)

  

10

(Design and Contingencies - $100,000)

  

11

(10)  State Police

  

12

(i)  Erie Headquarters, Erie County

  

13

14

15

16

(A)  Construct new headquarters facility,

garage, crime lab and aviation hangar to

replace existing owned and leased

facilities

  

17

Project Allocation

13,900,000

18

(Base Project Allocation - $10,750,000)

  

19

(Land Allocation - $1,000,000)

  

20

(Design and Contingencies - $2,150,000)

  

21

(ii)  Washington Headquarters, Washington County

  

22

23

(A)  Additional funds to construct new

headquarters building

  

24

Project Allocation

4,568,000

25

(Base Project Allocation - $4,152,000)

  

26

(Design and Contingencies - $416,000)

  

27

28

(iii)  Greensburg Headquarters, Westmoreland

County

  

29

(A)  Construct new headquarters facility

  

30

Project Allocation

16,500,000

- 56 -

 


1

(Base Project Allocation - $15,000,000)

  

2

(Design and Contingencies - $1,500,000)

  

3

(11)  State System of Higher Education

  

4

(i)  California University

  

5

6

7

(A)  Renovate Coover Hall to bring into

compliance and to minimize future

expenses

  

8

Project Allocation

14,500,000

9

(Base Project Allocation - $11,600,000)

  

10

(Design and Contingencies - $2,900,000)

  

11

(ii)  Cheyney University

  

12

13

(A)  Demolish underutilized and obsolete

buildings

  

14

Project Allocation

5,600,000

15

(Base Project Allocation - $4,480,000)

  

16

(Design and Contingencies - $1,120,000)

  

17

(iii)  Kutztown University

  

18

19

(A)  Construct new 69K electrical substation

to meet requirements

  

20

Project Allocation

8,000,000

21

(Base Project Allocation - $6,000,000)

  

22

(Design and Contingencies - $2,000,000)

  

23

(iv)  Lock Haven University

  

24

25

(A)  Additional funding to continue the

upgrade of fiber optics in all buildings

  

26

Project Allocation

2,000,000

27

(Base Project Allocation - $1,600,000)

  

28

(Design and Contingencies - $400,000)

  

29

30

(B)  Construction, infrastructure,

redevelopment and other related costs to

  

- 57 -

 


1

renovate Ulmer South Hall

2

Project Allocation

4,700,000

3

4

5

6

(C)  Construction, infrastructure,

redevelopment and other related costs

for the demolition of various buildings

on campus

  

7

Project Allocation

850,000

8

9

(D)  Construction and other related costs

for a new Science Center

  

10

Project Allocation

4,000,000

11

(v)  Millersville University

  

12

13

(A)  Rehabilitate university's electrical

distribution system

  

14

Project Allocation

3,500,000

15

(Base Project Allocation - $2,800,000)

  

16

(Design and Contingencies - $700,000)

  

17

(vi)  Shippensburg University

  

18

19

(A)  Renovate telecommunications

distribution system

  

20

Project Allocation

4,000,000

21

(Base Project Allocation - $3,000,000)

  

22

(Design and Contingencies - $1,000,000)

  

23

(12)  Department of Transportation

  

24

(i)  Allegheny County

  

25

26

(A)  Construct new vehicle wash building at

the Allegheny County Maintenance Garage

  

27

Project Allocation

690,000

28

(Base Project Allocation - $600,000)

  

29

(Design and Contingencies - $90,000)

  

30

(B)  Construct new service/pm building for

  

- 58 -

 


1

2

3

4

the Allegheny County Maintenance

Facility at the Allegheny County Tunnel-

Liberty necessary to meet program

requirements and building deficiencies

5

Project Allocation

2,750,000

6

(Base Project Allocation - $2,500,000)

  

7

(Design and Contingencies - $250,000)

  

8

(ii)  Armstrong County

  

9

10

11

12

(A)  Renovate and expand Armstrong County

Maintenance Facility to upgrade

building's system, improve program

requirements and energy efficiency

  

13

Project Allocation

1,150,000

14

(Base Project Allocation - $1,000,000)

  

15

(Design and Contingencies - $150,000)

  

16

(iii)  Bedford County

  

17

18

19

20

21

(A)  Renovate and expand Bedford County

Maintenance Facility to bring building

into code compliance; upgrade building's

systems, improve program requirements

and energy efficiency

  

  

  

  

  

22

Project Allocation

575,000

23

(Base Project Allocation - $500,000)

  

24

(Design and Contingencies - $75,000)

  

25

(iv)  Berks County

  

26

27

28

29

30

(A)  Renovate and expand Berks County

Maintenance Facility to bring building

into code compliance; upgrade building's

systems, improve program requirements

and energy efficiency

  

- 59 -

 


1

Project Allocation

575,000

2

(Base Project Allocation - $500,000)

  

3

(Design and Contingencies - $75,000)

  

4

(v)  Blair County

  

5

6

7

8

9

(A)  Renovate and expand Blair County

District 9-0 Office to bring building

into code compliance; upgrade building's

systems, improve program requirements

and energy efficiency

  

  

  

  

  

10

Project Allocation

345,000

11

(Base Project Allocation - $300,000)

  

12

(Design and Contingencies - $45,000)

  

13

14

15

16

(B)  Install emergency generator and repoint

building exterior at District 9-0 Office

to meet program requirements and

building deficiencies

  

17

Project Allocation

545,000

18

(Base Project Allocation - $500,000)

  

19

(Design and Contingencies - $45,000)

  

20

21

22

(C)  Construct new stockpile facility,

including site development, design and

construction of all required buildings

  

23

Project Allocation

1,665,000

24

(Base Project Allocation - $1,500,000)

  

25

(Land Allocation - $15,000)

  

26

(Design and Contingencies - $150,000)

  

27

(vi)  Bradford County

  

28

29

30

(A)  Renovate and expand Bradford County

Maintenance Facility to bring building

into code compliance; upgrade building's

  

- 60 -

 


1

2

systems, improve program requirements

and energy efficiency

3

Project Allocation

575,000

4

(Base Project Allocation - $500,000)

  

5

(Design and Contingencies - $75,000)

  

6

(vii)  Bucks County

  

7

8

9

10

11

12

13

14

(A)  Renovate and expand Bucks County

Welcome Center RSR Site P or construct

new facility, including parking lots,

rest rooms, display areas, tourism

service area, patios, picnic areas,

ramps, enhanced ADA accessibility and

any necessary building code-related

enhancements

  

15

Project Allocation

9,775,000

16

(Base Project Allocation - $8,500,000)

  

17

(Design and Contingencies - $1,275,000)

  

18

(viii)  Butler County

  

19

20

21

22

23

(A)  Renovate and expand Butler County

Maintenance Facility to bring building

into code compliance; upgrade building's

systems, improve program requirements

and energy efficiency

  

  

  

24

Project Allocation

2,875,000

25

(Base Project Allocation - $2,500,000)

  

26

(Design and Contingencies - $375,000)

  

27

(ix)  Cambria County

  

28

29

30

(A)  Renovate and expand Cambria County

Maintenance Facility to bring building

into code compliance; upgrade building's

  

- 61 -

 


1

2

systems, improve program requirements

and energy efficiency

3

Project Allocation

575,000

4

(Base Project Allocation - $500,000)

  

5

(Design and Contingencies - $75,000)

  

6

(x)  Cameron County

  

7

8

9

10

11

(A)  Renovate and expand Cameron County

Maintenance Facility to bring building

into code compliance, roof, upgrade

building's systems, improve program

requirements and energy efficiency

  

12

Project Allocation

675,000

13

(Base Project Allocation - $600,000)

  

14

(Design and Contingencies - $75,000)

  

15

(xi)  Carbon County

  

16

17

18

19

20

(A)  Renovate and expand Carbon County

Maintenance Facility to bring building

into code compliance; upgrade building's

systems, improve program requirements

and energy efficiency

  

21

Project Allocation

575,000

22

(Base Project Allocation - $500,000)

  

23

(Design and Contingencies - $75,000)

  

24

(xii)  Centre County

  

25

26

27

28

29

(A)  Construct new stand alone paint crew

facility at the Centre County

Maintenance Facility necessary to meet

program requirements and building

deficiencies

  

30

Project Allocation

575,000

- 62 -

 


1

(Base Project Allocation - $500,000)

  

2

(Design and Contingencies - $75,000)

  

3

(xiii)  Clarion County

  

4

5

6

7

8

(A)  Renovate and expand Clarion County

Maintenance Facility to bring building

into code compliance; upgrade building's

systems, improve program requirements

and energy efficiency

  

9

Project Allocation

862,000

10

(Base Project Allocation - $750,000)

  

11

(Design and Contingencies - $112,000)

  

12

(xiv)  Clearfield County

  

13

14

15

16

17

(A)  Construct new stand alone paint crew

facility at the Clearfield County

Maintenance Facility necessary to meet

program requirements and building

deficiencies

  

18

Project Allocation

575,000

19

(Base Project Allocation - $500,000)

  

20

(Design and Contingencies - $75,000)

  

21

22

23

24

25

26

27

28

(xv)  Clinton County

(A)  Renovate, expand and improve water

system and sewage treatment plant

facility at Sites 33/34 Safety Rest

Areas to bring buildings into code

compliance, upgrade buildings' systems,

roofs, improve program requirements and

energy efficiency

  

29

Project Allocation

550,000

30

(Base Project Allocation - $500,000)

  

- 63 -

 


1

(Design and Contingencies - $50,000)

  

2

(xvi)  Columbia County

  

3

4

5

6

7

8

9

(A)  Renovate, expand and improve water

system and sewage treatment plant

facility at Sites 37/38 Safety Rest

Areas to bring buildings into code

compliance, upgrade buildings' systems,

roofs, improve program requirements and

energy efficiency

  

10

Project Allocation

550,000

11

(Base Project Allocation - $500,000)

  

12

(Design and Contingencies - $50,000)

  

13

(xvii)  Crawford County

  

14

15

16

17

18

(A)  Renovate and expand Crawford County

Maintenance Facility to bring building

into code compliance, roof, upgrade

building's systems, improve program

requirements and energy efficiency

  

19

Project Allocation

675,000

20

(Base Project Allocation - $600,000)

  

21

(Design and Contingencies - $75,000)

  

22

(xviii)  Dauphin County

  

23

24

(A)  Demolish old Dauphin County Materials

Testing Facility

  

25

Project Allocation

2,200,000

26

(Base Project Allocation - $2,000,000)

  

27

(Design and Contingencies - $200,000)

  

28

29

30

(B)  Demolish existing Site 47 rest area and

construct new facility with expanded

vehicle and truck parking lots

  

- 64 -

 


1

Project Allocation

5,500,000

2

(Base Project Allocation - $5,000,000)

  

3

(Design and Contingencies - $500,000)

  

4

5

6

(C)  Demolish existing Site 48 rest area and

construct new facility with expanded

vehicle and truck parking lots

  

7

Project Allocation

5,500,000

8

(Base Project Allocation - $5,000,000)

  

9

(Design and Contingencies - $500,000)

  

10

11

12

(D)  Upgrade water system and HVAC to obtain

Tier 3 level designation at PennDOT

Server Farm

  

13

Project Allocation

2,200,000

14

(Base Project Allocation - $2,000,000)

  

15

(Design and Contingencies - $200,000)

  

16

(xix)  Delaware County

  

17

18

19

20

21

(A)  Renovate and expand Delaware County

Maintenance Facility to bring building

into code compliance; upgrade building's

systems, improve program requirements

and energy efficiency

  

22

Project Allocation

1,380,000

23

(Base Project Allocation - $1,200,000)

  

24

(Design and Contingencies - $180,000)

  

25

(xx)  Erie County

  

26

27

28

29

30

(A)  Renovate and expand Erie County

Maintenance Facility to bring building

into code compliance; upgrade building's

systems, improve program requirements

and energy efficiency

  

- 65 -

 


1

Project Allocation

862,000

2

(Base Project Allocation - $750,000)

  

3

(Design and Contingencies - $112,000)

  

4

(xxi)  Fayette County

  

5

6

7

8

9

(A)  Renovate and expand Fayette County

Maintenance Facility to bring building

into code compliance; upgrade building's

systems, improve program requirements

and energy efficiency

  

  

  

  

  

10

Project Allocation

575,000

11

(Base Project Allocation - $500,000)

  

12

(Design and Contingencies - $75,000)

  

13

14

15

(B)  Construct new salt storage building to

meet program requirements and winter

operations

  

16

Project Allocation

575,000

17

(Base Project Allocation - $500,000)

  

18

(Design and Contingencies - $75,000)

  

19

(xxii)  Franklin County

  

20

21

22

23

24

(A)  Renovate and expand Franklin County

Maintenance Facility to bring building

into code compliance; upgrade building's

systems, improve program requirements

and energy efficiency

  

25

Project Allocation

575,000

26

(Base Project Allocation - $500,000)

  

27

(Design and Contingencies - $75,000)

  

28

(xxiii)  Fulton County

  

29

30

(A)  Renovate and expand Fulton County

Maintenance Facility to bring building

  

- 66 -

 


1

2

3

into code compliance; upgrade building's

systems, improve program requirements

and energy efficiency

4

Project Allocation

575,000

5

(Base Project Allocation - $500,000)

  

6

(Design and Contingencies - $75,000)

  

7

8

9

10

11

12

13

(B)  Renovate, expand and improve water

system and sewage treatment plant

facility at Site 3 Safety Rest Area to

bring building into code compliance,

upgrade building's systems, roof,

improve program requirements and energy

efficiency

  

14

Project Allocation

550,000

15

(Base Project Allocation - $500,000)

  

16

(Design and Contingencies - $50,000)

  

17

18

19

20

21

22

23

(C)  Renovate, expand and improve water

system and sewage treatment plant

facility at Site B Safety Rest

Area/Welcome Center to bring building

into code compliance, upgrade building's

systems, roof, improve program

requirements and energy efficiency

  

24

Project Allocation

550,000

25

(Base Project Allocation - $500,000)

  

26

(Design and Contingencies - $50,000)

  

27

(xxiv)  Huntingdon County

  

28

29

30

(A)  Develop new stockpile facility for

Huntingdon County Maintenance Facility

at Pine Grove Mountain to include site

  

- 67 -

 


1

2

development, design and construction of

all required buildings

3

Project Allocation

1,530,000

4

(Base Project Allocation - $1,500,000)

  

5

(Land Allocation - $15,000)

  

6

(Design and Contingencies - $15,000)

  

7

(xxv)  Indiana County

  

8

9

10

11

12

(A)  Renovate and expand Indiana County

Maintenance Facility to bring building

into code compliance; upgrade building's

systems, improve program requirements

and energy efficiency

  

13

Project Allocation

2,300,000

14

(Base Project Allocation - $2,000,000)

  

15

(Design and Contingencies - $300,000)

  

16

(xxvi)  Jefferson County

  

17

18

19

20

21

(A)  Renovate and expand Jefferson County

Maintenance Facility to bring building

into code compliance; upgrade building's

systems, improve program requirements

and energy efficiency

  

22

Project Allocation

1,150,000

23

(Base Project Allocation - $1,000,000)

  

24

(Design and Contingencies - $150,000)

  

25

(xxvii)  Juniata County

  

26

27

28

29

30

(A)  Renovate and expand Juniata County

Maintenance Facility to bring building

into code compliance; upgrade building's

systems, improve program requirements

and energy efficiency

  

  

  

  

  

- 68 -

 


1

Project Allocation

575,000

2

(Base Project Allocation - $500,000)

  

3

(Design and Contingencies - $75,000)

  

4

(xxviii)  Lackawanna County

  

5

6

7

8

9

(A)  Renovate and expand Lackawanna District

4-0 Office to bring building into code

compliance; upgrade building's systems,

improve program requirements and energy

efficiency

  

  

  

  

  

10

Project Allocation

1,800,000

11

(Base Project Allocation - $1,500,000)

  

12

(Design and Contingencies - $300,000)

  

13

14

15

16

(B)  Renovate and expand existing parking

lot and entrance/exit ramps to

accommodate additional parking for RSR

Site 55 on I-81NB

  

17

Project Allocation

2,300,000

18

(Base Project Allocation - $2,000,000)

  

19

(Design and Contingencies - $300,000)

  

20

(xxix)  Lawrence County

  

21

22

(A)  Construct new vehicle wash building at

the Lawrence County Maintenance Garage

  

23

Project Allocation

690,000

24

(Base Project Allocation - $600,000)

  

25

(Design and Contingencies - $90,000)

  

26

27

28

29

30

(B)  Renovate and expand Lawrence County

Maintenance Facility to bring building

into code compliance; upgrade building's

systems, improve program requirements

and energy efficiency

  

- 69 -

 


1

Project Allocation

1,725,000

2

(Base Project Allocation - $1,500,000)

  

3

(Design and Contingencies - $225,000)

  

4

(xxx)  Lebanon County

  

5

6

7

8

9

(A)  Renovate and expand Lebanon County

Maintenance Facility to bring building

into code compliance; upgrade building's

systems, improve program requirements

and energy efficiency

  

10

Project Allocation

575,000

11

(Base Project Allocation - $500,000)

  

12

(Design and Contingencies - $75,000)

  

13

(xxxi)  Lehigh County

  

14

15

16

17

18

(A)  Renovate exterior site improvements,

including sidewalks, necessary to meet

program requirements and building

deficiencies of the Lehigh District 5-0

office facility

  

19

Project Allocation

575,000

20

(Base Project Allocation - $500,000)

  

21

(Design and Contingencies - $75,000)

  

22

(xxxii)  Luzerne County

  

23

24

(A)  Demolish old Luzerne County Maintenance

Facility and construct new facility

  

25

Project Allocation

1,100,000

26

(Base Project Allocation - $1,000,000)

  

27

(Design and Contingencies - $100,000)

  

28

(xxxiii)  Lycoming County

  

29

30

(A)  Renovate and expand Lycoming County

Maintenance Facility to bring building

  

- 70 -

 


1

2

3

into code compliance; upgrade building's

systems, improve program requirements

and energy efficiency

4

Project Allocation

575,000

5

(Base Project Allocation - $500,000)

  

6

(Design and Contingencies - $75,000)

  

7

(xxxiv)  McKean County

  

8

9

10

11

12

(A)  Renovate and expand McKean County

Maintenance Facility to bring building

into code compliance; upgrade building's

systems, improve program requirements

and energy efficiency

  

13

Project Allocation

575,000

14

(Base Project Allocation - $500,000)

  

15

(Design and Contingencies - $75,000)

  

16

(xxxv)  Mercer County

  

17

18

19

20

21

22

23

24

(A)  Renovate and expand Mercer County

welcome center/roadside rest area or

construct new facility, including

parking lots, rest rooms, display areas,

tourism service area, patios, picnic

areas, ramps, enhanced ADA accessibility

and any necessary building code-related

enhancements

  

25

Project Allocation

9,775,000

26

(Base Project Allocation - $8,500,000)

  

27

(Design and Contingencies - $1,275,000)

  

28

(xxxvi)  Mifflin County

  

29

30

(A)  Renovate and expand Mifflin County

Maintenance Facility to bring building

  

- 71 -

 


1

2

3

into code compliance, roof, upgrade

building's systems, improve program

requirements and energy efficiency

4

Project Allocation

675,000

5

(Base Project Allocation - $600,000)

  

6

(Design and Contingencies - $75,000)

  

7

(xxxvii)  Monroe County

  

8

9

10

11

12

(A)  Renovate and expand Monroe County

Maintenance Facility to bring building

into code compliance; upgrade building's

systems, improve program requirements

and energy efficiency

  

  

  

  

  

13

Project Allocation

460,000

14

(Base Project Allocation - $400,000)

  

15

(Design and Contingencies - $60,000)

  

16

17

18

19

(B)  Repair, replace and expand existing

vehicle and truck parking lots at the

Site 41 roadside rest area located on

I-80 eastbound in Monroe County

  

20

Project Allocation

550,000

21

(Base Project Allocation - $500,000)

  

22

(Design and Contingencies - $50,000)

  

23

(xxxviii)  Montgomery County

  

24

25

26

27

28

(A)  Renovate and expand Montgomery County

Maintenance Facility to bring building

into code compliance; upgrade building's

systems, improve program requirements

and energy efficiency

  

29

Project Allocation

575,000

30

(Base Project Allocation - $500,000)

  

- 72 -

 


1

(Design and Contingencies - $75,000)

  

2

3

4

5

6

(B)  Renovate and expand Montgomery District

6-0 office facility to bring building

into code compliance; upgrade building's

systems, improve program requirements

and energy efficiency

  

7

Project Allocation

1,380,000

8

(Base Project Allocation - $1,200,000)

  

9

(Design and Contingencies - $180,000)

  

10

(xxxix)  Northampton County

  

11

12

13

14

15

(A)  Renovate and expand Northampton County

Maintenance Facility to bring building

into code compliance; upgrade building's

systems, improve program requirements

and energy efficiency

  

  

  

  

  

16

Project Allocation

575,000

17

(Base Project Allocation - $500,000)

  

18

(Design and Contingencies - $75,000)

  

19

(xl)  Northumberland County

  

20

21

22

23

24

(A)  Renovate and expand Northumberland

County Maintenance Facility to bring

building into code compliance; upgrade

building's systems, improve program

requirements and energy efficiency

  

  

  

  

  

25

Project Allocation

575,000

26

(Base Project Allocation - $500,000)

  

27

(Design and Contingencies - $75,000)

  

28

(xli)  Perry County

  

29

30

(A)  Renovate and expand Perry County

Maintenance Facility to bring building

  

- 73 -

 


1

2

3

into code compliance; upgrade building's

systems, improve program requirements

and energy efficiency

4

Project Allocation

575,000

5

(Base Project Allocation - $500,000)

  

6

(Design and Contingencies - $75,000)

  

7

(xlii)  Somerset County

  

8

9

10

(A)  Construct new stockpile facility,

including site development, design and

construction of all required buildings

  

11

Project Allocation

1,665,000

12

(Base Project Allocation - $1,500,000)

  

13

(Land Allocation - $15,000)

  

14

(Design and Contingencies - $150,000)

  

15

(xliii)  Tioga County

  

16

17

18

19

20

(A)  Renovate and expand Tioga County

Maintenance Facility to bring building

into code compliance, roof, upgrade

building's systems, improve program

requirements and energy efficiency

  

21

Project Allocation

675,000

22

(Base Project Allocation - $600,000)

  

23

(Design and Contingencies - $75,000)

  

24

(xliv)  Venango County

  

25

26

27

28

29

(A)  Renovate and expand Venango County

Maintenance Facility to bring building

into code compliance; upgrade building's

systems, improve program requirements

and energy efficiency

  

30

Project Allocation

575,000

- 74 -

 


1

(Base Project Allocation - $500,000)

  

2

(Design and Contingencies - $75,000)

  

3

4

5

(B)  Replace elevators in District Office

1-0 to meet current ADA code

requirements

  

6

Project Allocation

825,000

7

(Base Project Allocation - $750,000)

  

8

(Design and Contingencies - $75,000)

  

9

(xlv)  Warren County

  

10

11

12

13

14

(A)  Renovate and expand Warren County

Maintenance Facility to bring building

into code compliance; upgrade building's

systems, improve program requirements

and energy efficiency

  

  

  

  

  

15

Project Allocation

575,000

16

(Base Project Allocation - $500,000)

  

17

(Design and Contingencies - $75,000)

  

18

Section 4.  Itemization of furniture and equipment projects.

19

Additional capital projects in the category of public

20

improvement projects consisting of the acquisition of movable

21

furniture and equipment to complete public improvement projects

22

and to be purchased by the Department of General Services, its

23

successors or assigns and to be financed by the incurring of

24

debt are hereby itemized, together with their respective

25

estimated financial costs, as follows:

26

27

  

Project

Total Project Allocation

28

(1)  Department of Agriculture

  

29

30

(A)  Original furnishings and equipment for

DGS Project 0700-0042, renovation

  

- 75 -

 


1

2

3

and/or addition of existing facility in

Harrisburg to provide for biosecurity

level 3 capabilities

4

Project Allocation

446,000

5

(Base Project Allocation - $446,000)

  

6

7

(2)  Department of Conservation and Natural

Resources

  

8

(i)  Kinzua Bridge State Park

  

9

10

(A)  Original furnishings and equipment for

the new office/visitor center

  

11

Project Allocation

3,000,000

12

(Base Project Allocation - $2,400,000)

  

13

(Design and Contingencies - $600,000)

  

14

(ii)  S. B. Elliott State Park

  

15

16

17

18

(A)  Additional funds for exhibits,

furnishings and equipment to complete

visitor center and overnight lodge

facility within the park

  

19

Project Allocation

3,500,000

20

(Base Project Allocation - $2,800,000)

  

21

(Design and Contingencies - $700,000)

  

22

(iii)  Sinnemahoning State Park

  

23

24

(A)  Original furnishings and equipment for

the new office/visitor center

  

25

Project Allocation

2,000,000

26

(Base Project Allocation - $1,600,000)

  

27

(Design and Contingencies - $400,000)

  

28

(iv)  Multiple State Parks, Statewide

  

29

30

(A)  Original furniture and equipment for

various Statewide projects

  

- 76 -

 


1

Project Allocation

3,500,000

2

(Base Project Allocation - $2,800,000)

  

3

(Design and Contingencies - $700,000)

  

4

(3)  Department of Education

  

5

(i)  Butler County Community College

  

6

7

(A)  Furniture and classroom technology and

equipment for the Linden Pointe Campus

  

8

Project Allocation

525,000

9

(ii)  Lincoln University

  

10

11

(A)  Original furniture and equipment for

Vail Hall

  

12

Project Allocation

2,000,000

13

(Base Project Allocation - $1,600,000)

  

14

(Design and Contingencies - $400,000)

  

15

16

(B)  Original furniture and equipment for

Lincoln Hall

  

17

Project Allocation

2,000,000

18

(Base Project Allocation - $1,600,000)

  

19

(Design and Contingencies - $400,000)

  

20

21

(C)  Original furniture and equipment for

Azikiwe-Nkrumah Hall

  

22

Project Allocation

1,500,000

23

(Base Project Allocation - $1,200,000)

  

24

(Design and Contingencies - $300,000)

  

25

(iii)  The Pennsylvania State University

  

26

27

28

(A)  Original furniture and equipment for

Henning Building/Chemical Ecology

Laboratories

  

29

Project Allocation

3,000,000

30

(Base Project Allocation - $3,000,000)

  

- 77 -

 


1

(iv)  Temple University

  

2

3

(A)  Original furniture and equipment for

Honors Program house

  

4

Project Allocation

3,000,000

5

(Base Project Allocation - $2,400,000)

  

6

(Design and Contingencies - $600,000)

  

7

(4)  Department of Military and Veterans Affairs

  

8

9

(i)  Southeastern Veterans' Center, Chester

County

  

10

11

12

(A)  Provide additional funding for Project

960-55 for furniture, fixtures and

equipment

  

13

Project Allocation

2,000,000

14

(Base Project Allocation - $2,000,000)

  

15

16

(ii)  Fort Indiantown Gap Readiness Center,

Lebanon County

  

17

18

(A)  Purchase furniture, fixtures and

equipment for DGS Project 962-20

  

19

Project Allocation

3,000,000

20

(Base Project Allocation - $3,000,000)

  

21

(5)  State System of Higher Education

  

22

(i)  Slippery Rock University

  

23

24

(A)  Original furniture and equipment for

McKay Building

  

25

Project Allocation

1,000,000

26

(Base Project Allocation - $1,000,000)

  

27

Section 5.  Itemization of transportation assistance projects.

28

(a)  Mass transit.--Additional capital projects in the

29

category of transportation assistance projects for mass transit

30

in which an interest is to be acquired or constructed by the

- 78 -

 


1

Department of Transportation, its successors or assigns and to

2

be financed by the incurring of debt are hereby itemized,

3

together with their estimated financial costs, as follows:

4

5

  

Project

Total Project Allocation

6

(1)  Area Transportation Authority

  

7

8

9

(i)  Provide for bus replacements, including 13

heavy duty mass transit vehicles and up to

27 Sprinter vehicles

  

10

Project Allocation

870,000

11

(Base Project Allocation - $783,000)

  

12

(Design and Contingencies - $87,000)

  

13

14

(ii)  Purchase transit vehicles and upgrade

facility

  

15

Project Allocation

2,000,000

16

(Base Project Allocation - $1,800,000)

  

17

(Design and Contingencies - $200,000)

  

18

(2)  Berks Area Reading Transportation Authority

  

19

20

21

(i)  Provide for replacement of 10 paratransit

vehicles and purchase of an automatic

vehicle locator system

  

22

Project Allocation

239,000

23

(Base Project Allocation - $215,000)

  

24

(Design and Contingencies - $24,000)

  

25

(3)  Centre Area Transportation Authority

  

26

27

28

(i)  Additional funding to replace CNG

compressors at the CNG fueling station and

to replace 10 CNG transit buses

  

29

Project Allocation

522,000

30

(Base Project Allocation - $470,000)

  

- 79 -

 


1

(Design and Contingencies - $52,000)

  

2

3

4

5

6

7

8

9

(ii)  Provide for second phase of Advanced

Public Transportation System, an automatic

vehicle locator system, and the purchase of

12 new vans, expansion of two additional

vanpools and facility improvements, and

replacement of roof membrane over

maintenance and bus storage areas of the

facility

  

10

Project Allocation

183,000

11

(Base Project Allocation - $165,000)

  

12

(Design and Contingencies - $18,000)

  

13

14

15

16

17

(iii)  Purchase buses to add to current fleet

for expanded service, replace diesel buses

that have met their useful life and

refurbish bus lanes in front of transit

center to load wheelchairs

  

18

Project Allocation

1,000,000

19

(Base Project Allocation - $900,000)

  

20

(Design and Contingencies - $100,000)

  

21

(4)  Crawford Area Transportation Authority

  

22

23

24

(i)  Provide additional funding for the

authority's intermodal/administrative

facility

  

25

Project Allocation

266,000

26

(Base Project Allocation - $239,000)

  

27

(Design and Contingencies - $27,000)

  

28

29

(ii)  Construct steel structure sheltered bus

storage facility and wash bay for bus fleet

  

30

Project Allocation

194,000

- 80 -

 


1

(Base Project Allocation - $175,000)

  

2

(Design and Contingencies - $19,000)

  

3

(5)  Dauphin County

  

4

5

6

(i)  Construct a mass transit station,

including infrastructure and other related

costs

  

7

Project Allocation

10,600,000

8

(6)  Fayette Area Coordinated Transportation

  

9

10

11

(i)  Provide for replacement of a fixed route

vehicle, facility upgrades and transit

equipment

  

12

Project Allocation

150,000

13

(Base Project Allocation - $135,000)

  

14

(Design and Contingencies - $15,000)

  

15

(7)  Mid Mon Valley Transit Authority

  

16

17

18

19

20

(i)  Replace three buses, modernize bus

maintenance facility for bus storage and

refurbish bus lanes in front of the transit

center to load wheelchair passengers more

safely

  

21

Project Allocation

588,000

22

(Base Project Allocation - $529,000)

  

23

(Design and Contingencies - $59,000)

  

24

(8)  Port Authority of Allegheny County

  

25

26

27

28

29

(i)  Provide Alpine Village Park and Ride

Facility for the complete design and

construction of additional spaces at the

park and ride located near the interchange

of Routes 22 and 286 in Monroeville

  

30

Project Allocation

1,350,000

- 81 -

 


1

(Base Project Allocation - $1,215,000)

  

2

(Design and Contingencies - $135,000)

  

3

4

5

6

(ii)  FY 2010-2011 Section 5307 Program,

replace and/or rehabilitate major

components of bus and fixed guide way

system

  

7

Project Allocation

7,020,000

8

(Base Project Allocation - $6,318,000)

  

9

(Design and Contingencies - $702,000)

  

10

11

12

13

(iii)  FY 2010-2011 Section 5309 Program,

replace and/or rehabilitate major

components within Authority's rail and bus

way system

  

14

Project Allocation

5,349,000

15

(Base Project Allocation - $4,814,000)

  

16

(Design and Contingencies - $535,000)

  

17

18

19

20

21

(iv)  FY 2010-2011 Section 5307 Flex Program,

provide replacement buses, light rail

vehicle mid-life overhaul, light rail

extension and expand Authority's Alpine

Village Park and Ride facility

  

22

Project Allocation

1,493,000

23

(Base Project Allocation - $1,344,000)

  

24

(Design and Contingencies - $149,000)

  

25

26

27

28

(v)  FY 2010-2011 Infrastructure Safety Renewal

Program, including improvements to

stations, signals, track, power and

buildings

  

29

Project Allocation

16,000,000

30

(Base Project Allocation - $14,400,000)

  

- 82 -

 


1

(Design and Contingencies - $1,600,000)

  

2

3

(vi)  FY 2010-2011 Vehicle Overhaul Program,

provide for major overhaul of rolling stock

  

4

Project Allocation

2,500,000

5

(Base Project Allocation - $2,250,000)

  

6

(Design and Contingencies - $250,000)

  

7

(9)  Red Rose Transit Authority

  

8

9

(i)  Replace mass transit buses which have met

their useful life

  

10

Project Allocation

400,000

11

(Base Project Allocation - $360,000)

  

12

(Design and Contingencies - $40,000)

  

13

14

15

(ii)  Provide for communications improvements

program and purchase of 12 shared ride

small transit vehicles

  

16

Project Allocation

202,000

17

(Base Project Allocation - $182,000)

  

18

(Design and Contingencies - $20,000)

  

19

20

(10)  Southeastern Pennsylvania Transportation

Authority

  

21

22

23

(i)  Provide for purchase of 400 hybrid 40-foot

low-floor transit buses to replace buses

which have met their useful life

  

24

Project Allocation

521,000

25

(Base Project Allocation - $469,000)

  

26

(Design and Contingencies - $52,000)

  

27

28

(ii)  Provide improvements at the Croydon and

Levittown Stations in Bucks County

  

29

Project Allocation

3,500,000

30

(Base Project Allocation - $3,150,000)

  

- 83 -

 


1

(Design and Contingencies - $350,000)

  

2

3

4

(iii)  Provide improved intermodal connections

between bus and rail at Glenside and

Jenkintown Stations including parking

  

5

Project Allocation

6,700,000

6

(Base Project Allocation - $6,030,000)

  

7

(Design and Contingencies - $670,000)

  

8

9

10

11

12

13

14

15

(iv)  FFY 2010 Transit Enhancement Program,

provide for bus purchase program,

paratransit vehicle purchase, utility fleet

renewal, SMART stations, new payment

technologies, station accessibility, subway

stations rehabilitation, track and catenary

improvements, rail line and substation

improvement

  

16

Project Allocation

13,416,000

17

(Base Project Allocation - $12,074,000)

  

18

(Design and Contingencies - $1,342,000)

  

19

20

21

22

23

24

25

(v)  FFY 2010 Rail Modernization Program,

provide for SMART stations, new payment

technologies, station accessibility, subway

station rehabilitation, rehabilitation of

City Hall and 15th Street Stations, track

and catenary improvements, regional rail

improvements and substation improvements

  

26

Project Allocation

12,900,000

27

(Base Project Allocation - $11,610,000)

  

28

(Design and Contingencies - $1,290,000)

  

29

30

(vi)  FFY 2010 Transit Enhancement Program,

provide for historic preservation,

  

- 84 -

 


1

2

3

4

rehabilitation and related activities; bus

shelters, landscaping, signage and enhanced

access to transit for persons with

disabilities

5

Project Allocation

420,000

6

(Base Project Allocation - $378,000)

  

7

(Design and Contingencies - $42,000)

  

8

9

10

11

12

(vii)  FFY 2010 Bus Purchase Program, provide

for acquisition of 400 diesel/electric

accessible 40-foot low-floor buses with a

pricing option for an additional 80 buses

which have met their useful life

  

13

Project Allocation

3,600,000

14

(Base Project Allocation - $3,240,000)

  

15

(Design and Contingencies - $360,000)

  

16

17

18

19

20

(viii)  FFY 2010 Federal Highway Flex Projects,

upgrade warning devices of various

railroad/highway grade crossings and

construct capital projects to improve air

quality and reduce congestion

  

21

Project Allocation

834,000

22

(Base Project Allocation - $751,000)

  

23

(Design and Contingencies - $83,000)

  

24

25

(ix)  FY 2009-2010 Vehicle Overhaul Program,

provide for major overhaul of rolling stock

  

26

Project Allocation

30,000,000

27

(Base Project Allocation - $27,000,000)

  

28

(Design and Contingencies - $3,000,000)

  

29

30

(x)  FY 2008-2009 Infrastructure Safety Renewal

Program, improve stations, signals, track,

  

- 85 -

 


1

power and buildings

2

Project Allocation

10,000,000

3

(Base Project Allocation - $9,000,000)

  

4

(Design and Contingencies - $1,000,000)

  

5

6

7

8

9

(xi)  FFY 2008 Clean Fuels bus purchase,

purchase 400 hybrid 40-foot low floor

transit buses with option to purchase 80

additional buses to replace buses which

have met their useful life

  

10

Project Allocation

595,000

11

(Base Project Allocation - $535,000)

  

12

(Design and Contingencies - $60,000)

  

13

14

15

16

17

(xii)  Renovate Bucks County Intermodal,

improve Levittown Station, including

replacement of station building and

infrastructure, improve pedestrian tunnels

and intersection

  

18

Project Allocation

2,845,000

19

(Base Project Allocation - $2,560,000)

  

20

(Design and Contingencies - $285,000)

  

21

22

23

(xiii)  Renovate Montgomery County stations,

improve select SEPTA stations including

Jenkintown, Glenside and Noble

  

24

Project Allocation

4,742,000

25

(Base Project Allocation - $4,268,000)

  

26

(Design and Contingencies - $474,000)

  

27

28

29

30

(xiv)  Renovate Paoli Station, provide

engineering and construction of

transportation center in Paoli, located

west of existing station

  

- 86 -

 


1

Project Allocation

290,000

2

(Base Project Allocation - $261,000)

  

3

(Design and Contingencies - $29,000)

  

4

5

6

7

8

(xv)  Renovate Villanova Intermodal Station,

design and construct high level platforms

canopies for inbound and outbound service

with new pedestrian tunnels and ADA

compliant ramps and stairs

  

9

Project Allocation

4,471,000

10

(Base Project Allocation - $4,024,000)

  

11

(Design and Contingencies - $447,000)

  

12

13

14

15

16

(xvi)  Design and construct 425 space parking

garage at 69th Street terminal including

ADA accessibility and pedestrian

connections between new garage and existing

terminal

  

17

Project Allocation

4,258,000

18

(Base Project Allocation - $3,832,000)

  

19

(Design and Contingencies - $426,000)

  

20

21

22

23

(xvii)  FFY 2011 Formula Program, acquire

different size buses based upon needs and

route characteristics in SEPTA's bus fleet

management plan

  

24

Project Allocation

16,955,000

25

(Base Project Allocation - $15,260,000)

  

26

(Design and Contingencies - $1,695,000)

  

27

28

29

30

(xviii)  FFY 2011 Rail Modernization Program,

provide for station accessibility, City

Hall station and 15th Street station

rehabilitation, Elwyn to Wawa Rail service,

  

- 87 -

 


1

2

3

4

5

6

Paoli line improvements, regional rail

substation improvements, parking expansion

program, transit and regional rail program,

new payment technologies, paratransit

vehicle purchase program and utility fleet

renewal

7

Project Allocation

15,822,000

8

(Base Project Allocation - $14,240,000)

  

9

(Design and Contingencies - $1,582,000)

  

10

11

12

13

14

(xix)  FFY 2011 Flex Program - Railroad/Highway

Grade Crossing, support installation or

upgrading of warning devices and renewal of

highway grade crossing surfaces, improve

air quality and reduce congestion

  

15

Project Allocation

705,000

16

(Base Project Allocation - $635,000)

  

17

(Design and Contingencies - $70,000)

  

18

19

20

21

22

23

24

25

26

27

28

29

(xx)  FFY 2011 Transit Enhancements, including

historic preservation, rehabilitation and

related activities: bus shelters;

landscaping and other scenic beautification

including street lights, public art,

pedestrian access and walkways; bicycle

access including storage facilities and

installation of equipment for transporting

bicycles on transit vehicles; transit

connections to parks; signage and enhanced

access to transit for persons with

disabilities

  

30

Project Allocation

238,000

- 88 -

 


1

(Base Project Allocation - $214,000)

  

2

(Design and Contingencies - $24,000)

  

3

4

(xxi)  FY 2010-2011 Vehicle Overhaul Program,

provide for major overhaul of rolling stock

  

5

Project Allocation

30,000,000

6

(Base Project Allocation - $27,000,000)

  

7

(Design and Contingencies - $3,000,000)

  

8

9

10

11

(xxii)  FY 2010-2011 Infrastructure Safety

Renewal Program, including improvements to

stations, signals, track, power and

buildings

  

12

Project Allocation

10,000,000

13

(Base Project Allocation - $9,000,000)

  

14

(Design and Contingencies - $1,000,000)

  

15

(11)  City of Washington

  

16

17

(i)  Replace two transit buses which have met

their useful life

  

18

Project Allocation

142,000

19

(Base Project Allocation - $128,000)

  

20

(Design and Contingencies - $14,000)

  

21

(b)  Rural and intercity rail.--Additional capital projects

22

in the category of transportation assistance projects for rural

23

and intercity rail service projects to be constructed or with

24

respect to which an interest is to be acquired by the Department

25

of Transportation, its successors or assigns and to be financed

26

by the incurring of debt are hereby itemized, together with

27

their respective estimated financial costs, as follows:

28

29

  

Project

Total Project Allocation

30

(1)  Blair County

  

- 89 -

 


1

(i)  Everett Railroad

  

2

3

4

5

6

7

8

(A)  Engineering and design, as well as

actual improvements and upgrades to the

Bedford Secondary Branch Line from the

Borough of Hollidaysburg to the Walter

Business Park located in Greenfield

Township, including construction,

infrastructure and other related costs

  

9

Project Allocation

2,000,000

10

(2)  Bucks County

  

11

(i)  Gamesa Wind US

  

12

13

14

(A)  Construction and reactivation of

approximately 5,000 feet of track in

Langhorne

  

15

Project Allocation

2,000,000

16

(Base Project Allocation - $1,800,000)

  

17

(Design and Contingencies - $200,000)

  

18

(3)  Centre County

  

19

(i)  Boggs Township and Milesburg Borough

  

20

21

(A)  Construction of the Nittany & Bald

Eagle Railroad Baker Runaround Track

  

22

Project Allocation

1,120,000

23

(ii)  Liberty and Howard Townships

  

24

25

26

27

(A)  Replacement of jointed rails and

related track improvements for Phase 4

of the Nittany & Bald Eagle Railroad

Main Rail Welding Project

  

28

Project Allocation

3,500,000

29

(4)  Cumberland County

  

30

(i)  Norfolk Southern Corporation

  

- 90 -

 


1

2

3

4

(A)  Crescent Corridor Project; extend

second main track in Mt. Holly Springs,

from MP LG15.6 to MP LG15.0, in

Cumberland County

  

5

Project Allocation

17,500,000

6

(Base Project Allocation - $16,100,000)

  

7

(Design and Contingencies - $1,400,000)

  

8

(5)  Chester County

  

9

(i)  Tredyffrin and Willistown Townships

  

10

11

12

(A)  Construction of the Paoli Transit

Center, including infrastructure and

other related costs

  

13

Project Allocation

20,000,000

14

(6)  Dauphin County

  

15

(i)  Norfolk Southern Corporation

  

16

17

18

19

(A)  Crescent Corridor Project; construct

second main track in Harrisburg wye,

from MP HP111.4 to MP LG0.5, in Dauphin

County

  

20

Project Allocation

7,000,000

21

(Base Project Allocation - $6,440,000)

  

22

(Design and Contingencies - $560,000)

  

23

24

25

26

(B)  Crescent Corridor Project; upgrades

and rail reconstruction to the

Intermodal Yard in Harrisburg, Dauphin

County

  

27

Project Allocation

20,000,000

28

(Base Project Allocation - $18,000,000)

  

29

(Design and Contingencies - $2,000,000)

  

30

(7)  Erie County

  

- 91 -

 


1

(i)  Erie Inland Port-Rail Terminal

  

2

3

4

5

(A)  Acquisition, construction,

infrastructure and other related costs

for the Erie Inland Port-Rail Terminal

and Logistics Park Phase I

  

6

Project Allocation

30,000,000

7

(8)  Franklin County

  

8

(i)  Norfolk Southern Corporation

  

9

10

11

(A)  Crescent Corridor Project; extend

second main track in Greencastle, from

MP HW60 to MP HW68, in Franklin County

  

12

Project Allocation

15,500,000

13

(Base Project Allocation - $14,260,000)

  

14

(Design and Contingencies - $1,240,000)

  

15

16

17

(B)  Crescent Corridor Project; construct

new intermodal terminal yard in

Greencastle, Franklin County

  

18

Project Allocation

98,000,000

19

(Base Project Allocation - $90,160,000)

  

20

(Design and Contingencies - $7,840,000)

  

21

(9)  Huntingdon County

  

22

(i)  East Broad Top Connecting Railroad

  

23

24

25

26

27

28

29

30

(A)  Three-phase project to include the

acquisition of the Mount Union East

Broad Top trackage and land,

improvements to track, addition of

storage and repair of trackage,

construction of loading station on the

existing East Broad Top land, usage of

old trackage and ROW in Mount Union to

  

- 92 -

 


1

Orbisonia and other related costs

2

Project Allocation

2,785,000

3

(10)  Lehigh County

  

4

(i)  Upper Macungie Township

  

5

6

7

(A)  Extension of rail service in Upper

Macungie Township from existing line to

serve new buildings

  

8

Project Allocation

1,000,000

9

(11)  Lycoming County

  

10

(i)  City of Williamsport

  

11

12

13

(A)  Infrastructure improvements for the

Newberry Rail Yard Intermodal Facility

in the Reach Road Industrial Park

  

14

Project Allocation

1,000,000

15

(12)  Montgomery County

  

16

(i)  Ambler Borough

  

17

18

19

(A)  Acquisition, construction and other

related costs to redevelop the Ambler

Main Street Rail Corridor

  

20

Project Allocation

5,000,000

21

(13)  Montour County

  

22

(i)  Danville Borough

  

23

24

25

(A)  Construction and other related costs

for the Irontown Commerce Center Rail

Facilities

  

26

Project Allocation

2,772,000

27

(14)  Northampton County

  

28

(i)  Scots Lubricants

  

29

30

(A)  Construction of rail access to

manufacturing facility in Northampton

  

- 93 -

 


1

Borough

2

Project Allocation

700,000

3

(Base Project Allocation - $630,000)

  

4

(Design and Contingencies - $70,000)

  

5

(15)  Northumberland County

  

6

(i)  Coal Township

  

7

8

(A)  Construction and other related costs

for the SEEDCO North Rail Facilities

  

9

Project Allocation

2,695,000

10

11

(B)  Construction and other related costs

for the SEEDCO South Rail Facilities

  

12

Project Allocation

1,078,000

13

(ii)  Norfolk Southern Corporation

  

14

15

16

17

18

19

20

(A)  Rehabilitation and rebuilding of

railroad crossing bridge serving F.P.

Leopold and Moran Industries, connecting

spur lines off Buffalo Line of Norfolk

Southern and construction costs related

to development of rail-served intermodal

yard

  

21

Project Allocation

1,900,000

22

(16)  Philadelphia County

  

23

(i)  Norfolk Southern Corporation

  

24

25

26

(A)  Crescent Corridor Project; construct

addition to intermodal terminal at Navy

Yard in Philadelphia County

  

27

Project Allocation

5,000,000

28

(Base Project Allocation - $4,600,000)

  

29

(Design and Contingencies - $400,000)

  

30

(ii)  City of Phiadelphia

  

- 94 -

 


1

2

3

(A)  Construction, infrastructure and other

related costs for a waste-to-rail

transfer station

  

4

Project Allocation

6,424,000

5

(17)  Union County

  

6

(i)  Lewisburg and Buffalo Creek Railroad

  

7

8

9

(A)  Replacement of timber ties, walkway

and ground tie timbers for bridge number

166.54

  

10

Project Allocation

100,000

11

12

(ii)  West Shore Railroad in Union and

Northumberland Counties

  

13

14

15

16

17

18

19

20

(A)  Capital improvements to bridges

numbered 170.29 and 170.45, including

removing and replacing the timber ties

on the four east end spans of each

bridge structure and replacement of

walkway and timber guard. New ground tie

timbers to be placed in the approach

track at each end of the bridge

  

21

Project Allocation

430,000

22

(18)  York County

  

23

(i)  Church & Dwight/Arm & Hammer

  

24

25

26

(A)  Construction and related rail work of

new rail spurs servicing the Davies

Facility in Jackson Township

  

27

Project Allocation

2,300,000

28

(Base Project Allocation - $2,070,000)

  

29

(Design and Contingencies - $230,000)

  

30

(ii)  York Railway Company

  

- 95 -

 


1

2

3

4

(A)  Rehabilitation, infrastructure,

construction and other related costs for

new sidings and yard tracks for the York

Railway Company

  

5

Project Allocation

20,000,000

6

(c)  Air transportation.--Additional capital projects in the

7

category of transportation assistance projects for air

8

transportation service to which an interest is to be acquired by

9

the Department of Transportation, its successors or assigns and

10

to be financed by the incurring of debt are hereby itemized,

11

together with their respective estimated financial costs, as

12

follows:

13

14

  

Project

Total Project Allocation

15

(1)  Chester County

  

16

(i)  New Garden Flying Field

  

17

18

(A)  Construction of public use terminal

building, including related costs

  

19

Project Allocation

2,235,000

20

21

(B)  Construction of base hangar, including

related costs

  

22

Project Allocation

2,278,000

23

(2)  Lehigh County

  

24

(i)  Lehigh-Northampton Airport Authority

  

25

26

(A)  Construction of hangar for Queen City

Airport, including related costs

  

27

Project Allocation

1,100,000

28

29

30

(B)  Construction of bulk aircraft storage

hangar at Queen City Airport, including

related costs

  

- 96 -

 


1

Project Allocation

2,000,000

2

3

4

(C)  Construction of hangar at Lehigh

Valley International Airport, including

related costs

  

5

Project Allocation

3,400,000

6

(3)  Snyder County

  

7

(i)  Penn Valley Airport

  

8

9

10

11

12

13

(A)  Construction, acquisition and other

related costs for a new, modern, energy-

efficient hangar, renovation of existing

hangars, construction of new waste oil

heating system and construction of

additional t-hangars

  

14

Project Allocation

1,345,000

15

Section 6.  Itemization of redevelopment assistance projects.

16

Additional capital projects in the category of redevelopment

17

assistance projects for capital grants by the Department of

18

Community and Economic Development, its successors or assigns,

19

authorized under the provisions of the act of May 20, 1949

20

(P.L.1633, No.493), known as the Housing and Redevelopment

21

Assistance Law, and redevelopment assistance capital projects

22

and to be financed by the incurring of debt, are hereby

23

itemized, together with their estimated financial costs, as

24

follows:

25

26

  

Project

Total Project Allocation

27

(1)  Adams County

  

28

(i)  County Projects

  

29

30

(A)  Acquisition, construction,

infrastructure and other related costs

  

- 97 -

 


1

2

for an economic development project in

the county

3

Project Allocation

2,000,000

4

(ii)  Gettysburg Borough

  

5

6

7

(A)  Acquisition and renovation of a vacant

building to serve as a community arts

education center

  

8

Project Allocation

1,150,000

9

(2)  Allegheny County

  

10

(i)  County Projects

  

11

12

13

14

15

(A)  Acquisition, construction,

infrastructure and other related costs

for an industrial facility in the

vicinity of the Pittsburgh International

Airport

  

16

Project Allocation

30,000,000

17

18

19

(B)  Acquisition, remediation construction

and other related costs for a

film/television studio project

  

20

Project Allocation

10,000,000

21

22

23

24

(C)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

25

Project Allocation

10,000,000

26

27

28

(D)  Construction, infrastructure and other

related costs for the Jewish Family and

Children's Service facilities

  

29

Project Allocation

300,000

30

(ii)  City of Pittsburgh

  

- 98 -

 


1

2

3

4

(A)  Acquisition, construction,

infrastructure and other related costs

for Education Management Corporation

expansion

  

5

Project Allocation

5,000,000

6

7

8

9

(B)  Rebuild public park adjacent to

Children's Museum of Pittsburgh,

including construction, infrastructure

and other related costs

  

10

Project Allocation

3,000,000

11

12

13

14

(C)  Construction, infrastructure,

redevelopment and other related costs to

Children's Museum of Pittsburgh Square

Park project

  

15

Project Allocation

3,000,000

16

17

18

19

(D)  Construction, infrastructure,

redevelopment and other related costs

for the Hill House Community Facilities

renovation project

  

20

Project Allocation

2,000,000

21

22

23

24

(E)  Construction, redevelopment and other

related costs for a mixed-use

development project at the former

Nabisco Factory

  

25

Project Allocation

5,000,000

26

27

28

29

(F)  Construction, infrastructure,

redevelopment and other related costs

for the renovation of the Baum Boulevard

Building

  

30

Project Allocation

25,000,000

- 99 -

 


1

2

3

4

(G)  Construction, infrastructure,

redevelopment and other related costs

for the Flag Plaza renovation and

expansion project

  

5

Project Allocation

2,000,000

6

7

8

(H)  Construction, infrastructure,

redevelopment and other related costs to

build the new DCK Worldwide headquarters

  

9

Project Allocation

10,750,000

10

11

12

13

14

(I)  Construction, infrastructure,

redevelopment and other related costs

for the Greenprint Plan for Hill

District and restoration of local urban

parks in Pittsburgh

  

15

Project Allocation

500,000

16

17

(J)  Construction and other related costs

for the Boutique Hotel project

  

18

Project Allocation

4,000,000

19

20

21

(K)  Construction, infrastructure and other

related costs for the School of Animal

Sciences at Chatham University

  

22

Project Allocation

15,000,000

23

24

25

26

(L)  Construction, infrastructure and other

related costs for the University of

Pittsburgh Medical Center Cancer Centers

expansion and upgrades 

  

27

Project Allocation

18,000,000

28

29

30

(M)   Construction, infrastructure,

redevelopment and other related costs

for the Jewish Community Center of

  

- 100 -

 


1

Greater Pittsburgh

2

Project Allocation

250,000

3

4

5

6

(N)  Construction, infrastructure,

redevelopment and other related costs

for the Panther Hollow Lake restoration

and boathouse project

  

7

Project Allocation

6,100,000

8

9

10

11

(O)  Construction, infrastructure,

redevelopment and other related costs

for the Woodland Campus renovations at

Chatham University

  

12

Project Allocation

8,000,000

13

14

15

(P)  Construction, infrastructure and other

related costs for expansion and upgrades

at the Magee-Women's Hospital of UPMC

  

16

Project Allocation

16,000,000

17

18

19

(Q)  Construction, infrastructure,

redevelopment and other related costs

for an assisted living facility

  

20

Project Allocation

1,000,000

21

22

23

24

(R)  Construction, infrastructure and other

related costs for UPMC Presbyterian -

Shadyside campus renovations and

upgrades

  

25

Project Allocation

20,000,000

26

27

28

29

(S)  Construction, infrastructure,

redevelopment and other related costs

for an Environmental Center at Frick

Park

  

30

Project Allocation

7,186,000

- 101 -

 


1

2

3

4

(T)  Acquisition, construction,

infrastructure, redevelopment and other

related costs for Homewood Brushton area

improvements

  

5

Project Allocation

6,000,000

6

7

8

9

(U)  Acquisition, construction,

redevelopment and other related costs

for the West Penn Allegheny Health

System Education and Research Center

  

10

Project Allocation

20,000,000

11

12

13

14

(V)  Construction, infrastructure,

redevelopment and other related costs

for the Chatham Eastside renovations at

Chatham University

  

15

Project Allocation

10,000,000

16

17

18

(W)  Construction, infrastructure and other

related costs for a community center in

the 31st Ward

  

19

Project Allocation

1,250,000

20

21

22

(X)  Construction, infrastructure and other

related costs to revitalize Allegheny

Square Park

  

23

Project Allocation

1,000,000

24

25

26

27

(Y)  Construction, infrastructure,

redevelopment and other related costs

for the Eden Hall Campus at Chatham

University

  

28

Project Allocation

20,000,000

29

(iii)  Findlay Township

  

30

(A)  Acquisition, construction,

  

- 102 -

 


1

2

3

infrastructure and other related costs

for Education Management Corporation

expansion

4

Project Allocation

5,000,000

5

(iv)  Indiana Township

  

6

7

8

9

10

(A)  Acquisition, construction,

infrastructure, abatement of hazardous

materials and other related costs for

the Indiana Township Town Hall and

Community Center

  

11

Project Allocation

1,000,000

12

(v)  Marshall Township

  

13

14

15

16

(A)  Acquisition, construction,

infrastructure and other related costs

for Education Management Corporation

expansion

  

17

Project Allocation

5,000,000

18

(vi)  McKeesport Township

  

19

20

21

(A)  Construction, infrastructure and other

related costs for UPMC McKeesport Campus

facilities renovation and upgrades

  

22

Project Allocation

2,000,000

23

(vii)  Monroeville Township

  

24

25

26

27

(A)  Construction, infrastructure,

redevelopment and other related costs

for Pittsburgh Supercomputing Center

upgrades

  

28

Project Allocation

4,000,000

29

(viii)  Moon Township

  

30

(A)  Construction of new business school

  

- 103 -

 


1

2

complex at Robert Morris University,

including necessary costs

3

Project Allocation

5,000,000

4

5

6

7

(B)  Construction of a Regional Research and

Innovations in Simulation Education

(RISE) Center at Robert Morris

University, including necessary costs

  

8

Project Allocation

5,000,000

9

(ix)  Robinson Township

  

10

11

12

13

(A)  Acquisition, construction,

infrastructure and other related costs

for Education Management Corporation

expansion

  

14

Project Allocation

5,000,000

15

(x)  South Fayette Township

  

16

17

18

(A)  Acquisition, construction and other

related costs for the South Fayette

Civic Center

  

19

Project Allocation

1,500,000

20

(xi)  Verona Township

  

21

22

23

(A)  Acquisition, construction and other

related costs for the Steel City Rowing

Boathouse project

  

24

Project Allocation

500,000

25

(3)  Armstrong County

  

26

(i)  County Projects

  

27

28

29

30

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

- 104 -

 


1

Project Allocation

2,000,000

2

(4)  Beaver County

  

3

(i)  County Projects

  

4

5

6

7

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

8

Project Allocation

2,000,000

9

10

11

12

13

14

15

(B)  Demolition, in whole or in part, of the

former Aliquippa Community Hospital;

property improvements, including the

construction of required infrastructure;

and building construction associated

with a mixed-use development in the City

of Aliquippa and Hopewell Township

  

16

Project Allocation

10,000,000

17

18

19

20

21

(C)  Property improvements, including the

construction of infrastructure and

buildings and construction associated

with a mixed-use development in Center

Township and Potter Township

  

22

Project Allocation

12,500,000

23

24

25

26

27

28

29

30

(D)  Property improvements, including the

construction of required infrastructure;

construction of buildings and related

support facilities associated with the

industrial and mixed-use

development/redevelopment of a former

industrial site located on the left bank

of the Ohio River in the City of

  

- 105 -

 


1

2

Aliquippa, the Borough of Monaca,

Hopewell Township and Center Township

3

Project Allocation

25,000,000

4

(ii)  City of Aliquippa

  

5

6

7

8

(A)  Construction, infrastructure,

redevelopment and other related costs

for the Aliquippa/Hopewell mixed-use

development project

  

9

Project Allocation

10,000,000

10

(iii)  Center Township

  

11

12

13

(A)  Construction, infrastructure and other

related costs for the Center and Potter

Townships mixed-use development project

  

14

Project Allocation

12,500,000

15

16

17

18

(B)  Construction of an air traffic control

tower simulation laboratory at the

Community College of Beaver County,

including related costs

  

19

Project Allocation

1,000,000

20

(iv)  Dougherty Township

  

21

22

23

(A)  Capital improvements to the facilities

of McGuire Memorial, including

construction and other related costs

  

24

Project Allocation

6,000,000

25

(v)  Midland Borough

  

26

27

28

29

(A)  Acquisition, construction,

infrastructure, redevelopment and other

related costs for the Midland Parking

Garage

  

30

Project Allocation

2,500,000

- 106 -

 


1

(5)  Bedford County

  

2

(i)  County Projects

  

3

4

5

6

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

7

Project Allocation

2,000,000

8

(ii)  West Providence Township

  

9

10

11

12

13

(A)  Construction of a new facility and

capital improvements to existing

facility at the Bedford Campus of

Allegheny College of Maryland, including

infrastructure and other related costs

  

14

Project Allocation

2,875,000

15

(6)  Berks County

  

16

(i)  County Projects

  

17

18

19

20

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

21

Project Allocation

5,000,000

22

(ii)  City of Reading

  

23

24

25

(A)  Construction of an outdoor track and

field facility at Albright College,

including related costs

  

26

Project Allocation

2,000,000

27

(iii)  Richmond Township

  

28

29

(A)  Redevelopment of the Historic Inn at

Moselem Springs, including related costs

  

30

Project Allocation

2,200,000

- 107 -

 


1

(7)  Blair County

  

2

(i)  County Projects

  

3

4

5

6

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

7

Project Allocation

2,000,000

8

9

10

(B)  Capital improvements to parks and other

facilities for Central Blair Recreation

and Parks Commission

  

11

Project Allocation

1,187,000

12

13

14

15

16

(C)  Redevelopment, demolition,

reconstruction, site preparation, access

improvements and acquisition of

facilities in the Altoona/Blair County

area

  

17

Project Allocation

20,000,000

18

19

20

(D)  Construction of multimunicipal complex

at the South Altoona Business Park in

the City of Altoona/Logan Township

  

21

Project Allocation

5,500,000

22

23

24

25

26

27

28

29

(E)  Design, acquisition, demolition and

construction of infrastructure,

including adjacent off-site improvements

for the development of a multifaceted

business park in the City of Altoona and

Logan Township located in the vicinity

of Norfolk Southern property, north and

south of the Juniata 8th Street Bridge

  

30

Project Allocation

7,500,000

- 108 -

 


1

2

3

(F)  Redevelopment of Veterans Memorial

Field, including construction and other

related costs

  

4

Project Allocation

1,500,000

5

6

7

8

9

10

(G)  Altoona-Blair County Development

Corporation, redevelopment, demolition,

reconstruction, site preparation and

access improvements focusing on urban

centers throughout communities in Blair

County

  

11

Project Allocation

3,500,000

12

13

14

15

(H)  Acquisition, demolition, redevelopment

and construction of mixed-use,

multitenant facilities in the City of

Altoona and Logan Township

  

16

Project Allocation

4,000,000

17

18

19

20

(I)  Construction of a 30,000-square-foot

multitenant industrial building to be

located in the I-99 Enterprise Campus,

including related costs

  

21

Project Allocation

4,000,000

22

23

24

25

26

27

(J)  Infrastructure improvements for KOZ

businesses and industrial sites located

in Blair County with emphasis along the

I-99 Corridor, including acquisition,

construction, infrastructure,

redevelopment and other related costs

  

28

Project Allocation

5,000,000

29

30

(K)  Design, acquisition and construction of

infrastructure, including adjacent off-

  

- 109 -

 


1

2

3

site improvements, for development of

industrial/commercial properties located

along I-99 in Northern Blair County

4

Project Allocation

4,000,000

5

6

7

8

9

10

(L)  Acquisition, environmental assessment,

engineering and design for the

construction of a new business park

located along the I-99 Corridor in

Southern Blair County, including

construction and other related costs

  

11

Project Allocation

4,000,000

12

13

14

15

16

(M)  Acquisition, redevelopment, demolition,

site preparation, access improvements

and enhancement improvements focusing on

urban center communities located

throughout Blair County

  

17

Project Allocation

7,500,000

18

19

20

21

(N)  Acquisition, redevelopment, demolition

and construction of mixed-use,

multitenant and commercial facilities

located along the I-99 Corridor

  

22

Project Allocation

5,000,000

23

24

25

26

27

(O)  Final design, engineering and

construction of necessary infrastructure

improvements to support the

redevelopment of the former Car Shops

property, including other related costs

  

28

Project Allocation

2,500,000

29

(ii)  City of Altoona

  

30

(A)  Redevelopment of the Altoona Regional

  

- 110 -

 


1

2

3

Health System's Bon Secours Hospital

Campus to support new commercial and

industrial uses, including related costs

4

Project Allocation

5,000,000

5

6

7

8

9

(B)  Streetscape improvements to support the

redevelopment of the Altoona Regional

Health System's Altoona Health Campus,

including construction and other related

costs

  

10

Project Allocation

5,000,000

11

12

13

(C)  Capital improvements to the roundhouse

at the Altoona Railroaders Museum for a

training facility

  

14

Project Allocation

1,600,000

15

16

17

18

19

(D)  Acquisition and redevelopment of

vacant, deteriorated buildings in

downtown Altoona to support future

growth of Penn State Altoona's downtown

educational complex

  

20

Project Allocation

2,000,000

21

22

23

24

(E)  Acquisition and demolition of property

and construction of a 443-car parking

garage/transportation facility located

in downtown Altoona

  

25

Project Allocation

5,000,000

26

(iii)  Hollidaysburg Borough

  

27

28

(A)  Construction of a new facility for the

Hollidaysburg Area Public Library

  

29

Project Allocation

2,000,000

30

(8)  Bradford County

  

- 111 -

 


1

(i)  County Projects

  

2

3

4

5

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

6

Project Allocation

2,000,000

7

(9)  Bucks County

  

8

(i)  County Projects

  

9

10

11

(A)  Construction, infrastructure and other

related costs at the Keystone Industrial

Port Complex

  

12

Project Allocation

15,000,000

13

14

15

16

(B)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

17

Project Allocation

5,000,000

18

(ii)  Bristol Township

  

19

20

21

(A)  Construction, renovations and

infrastructure improvements in the Bucks

County Enterprise Zone

  

22

Project Allocation

5,000,000

23

(iii)  Doylestown Township

  

24

25

26

(A)  Construction of an integrated science

and applied learning center for Delaware

Valley College, including related costs

  

27

Project Allocation

13,000,000

28

(iv)  Falls Township

  

29

30

(A)  Acquisition, infrastructure,

construction and other related costs for

  

- 112 -

 


1

2

an industrial facility at the Keystone

Industrial Port Complex

3

Project Allocation

30,000,000

4

5

6

7

8

(B)  Acquisition, infrastructure,

construction and other related costs for

a facility at the Keystone Industrial

Port Complex for commercial, industrial

or multipurpose use

  

9

Project Allocation

5,000,000

10

(v)  Newtown Township

  

11

12

13

14

(A)  Construction, infrastructure,

redevelopment other related costs to

renovate and expand the Newtown Athletic

Club

  

15

Project Allocation

1,000,000

16

(10)  Butler County

  

17

(i)  County Projects

  

18

19

20

21

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

22

Project Allocation

2,000,000

23

(11)  Cambria County

  

24

(i)  County Projects

  

25

26

27

28

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

29

Project Allocation

2,000,000

30

(B)  Construction, infrastructure,

  

- 113 -

 


1

2

3

redevelopment and other related costs

for the Cambria County Industrial

Development Park

4

Project Allocation

1,500,000

5

(ii)  City of Johnstown

  

6

7

8

9

(A)  Construction, acquisition,

infrastructure, redevelopment and other

related costs for the John P. Murtha

Innovation Lab

  

10

Project Allocation

1,000,000

11

12

13

14

(B)  Construction, acquisition,

infrastructure, redevelopment and other

related costs for the Main Street West

Redevelopment Multi-Use District Project

  

15

Project Allocation

4,000,000

16

17

18

(C)  Construction, acquisition,

infrastructure, redevelopment and other

related costs for Stonycreek River Park

  

19

Project Allocation

2,000,000

20

21

22

23

(D)  Construction, infrastructure,

redevelopment and other related costs

for Alternative Community Resource

Program facilities renovations

  

24

Project Allocation

2,000,000

25

(iii)  Richland Township

  

26

27

28

29

(A)  Construction, infrastructure,

redevelopment and other related costs

for the Richland Township Multi-Use

Facility and Community Building

  

30

Project Allocation

1,500,000

- 114 -

 


1

(12)  Cameron County

  

2

(i)  County Projects

  

3

4

5

6

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

7

Project Allocation

2,000,000

8

(13)  Carbon County

  

9

(i)  County Projects

  

10

11

12

13

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

14

Project Allocation

2,000,000

15

(ii)  East Side Borough/Kidder Township

  

16

17

18

(A)  Construction, infrastructure and other

related costs for the White Haven

Recreation Improvement project

  

19

Project Allocation

4,000,000

20

(iii)  Lehighton Borough

  

21

22

23

(A)  Acquisition, construction,

infrastructure and other related costs

for a new fire station

  

24

Project Allocation

2,125,000

25

(14)  Centre County

  

26

(i)  County Projects

  

27

28

29

30

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

- 115 -

 


1

Project Allocation

2,000,000

2

(ii)  Rush Township

  

3

4

5

(A)  Revitalization of the former PAH site,

including construction and other related

costs

  

6

Project Allocation

5,000,000

7

8

9

(B)  Construction, redevelopment and other

related costs for a new arts and

cultural entertainment center

  

10

Project Allocation

10,000,000

11

12

(C)  Construction of a new firehouse in

Philipsburg, including related costs

  

13

Project Allocation

2,000,000

14

(15)  Chester County

  

15

(i)  County Projects

  

16

17

18

19

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

20

Project Allocation

5,000,000

21

(ii)  Atglen Borough

  

22

23

24

25

(A)  Construction, infrastructure,

redevelopment and other related costs

for expansion of the ITP Sellars

Nonwovens Manufacturing Plant

  

26

Project Allocation

1,500,000

27

(iii)  East Whiteland Township

  

28

29

30

(A)  Construction of a new nursing/science

building and renovation of existing

science building, including related

  

- 116 -

 


1

costs, at Immaculata University

2

Project Allocation

20,000,000

3

(iv)  London Grave Township

  

4

5

6

7

(A)  Acquisition, construction,

redevelopment and other related costs

for the Chester County Youth Fitness

Complex

  

8

Project Allocation

500,000

9

(v)  Londonderry Township

  

10

11

12

(A)  Acquisition, construction,

redevelopment and other related costs to

renovate the historic White Horse Inn

  

13

Project Allocation

1,000,000

14

(vi)  New Garden Township

  

15

16

(A)  Construction of base hangar at New

Garden Flying Field

  

17

Project Allocation

1,139,000

18

19

(B)  Construction of public use terminal

building at New Garden Flying Field

  

20

Project Allocation

1,119,000

21

(vii)  Oxford Borough

  

22

23

24

25

(A)  Acquisition, construction,

infrastructure, redevelopment and other

related costs for restoration of the Old

Oxford Borough Theater

  

26

Project Allocation

800,000

27

(viii)  South Coatesville Borough

  

28

29

30

(A)  Acquisition, construction,

infrastructure, redevelopment and other

related costs for the First Avenue

  

- 117 -

 


1

Corridor Revitalization project

2

Project Allocation

1,552,000

3

4

(ix)  Tredyffrin Township and Willistown

Township

  

5

6

7

8

9

(A)  Acquisition, construction,

infrastructure, abatement of hazardous

materials, redevelopment and other

related costs for the Paoli Transit

Center

  

10

Project Allocation

20,000,000

11

(x)  Wallace Township

  

12

13

14

(A)  Acquisition, construction,

infrastructure, redevelopment and other

related costs for Valhalla Brandywine

  

15

Project Allocation

20,000,000

16

(xi)  West Chester Borough

  

17

18

19

20

(A)  Construction, infrastructure,

redevelopment and other related costs to

renovate the Safe Harbor Homeless

Shelter

  

21

Project Allocation

500,000

22

(16)  Clarion County

  

23

(i)  County Projects

  

24

25

26

27

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

28

Project Allocation

2,000,000

29

(17)  Clearfield County

  

30

(i)  County Projects

  

- 118 -

 


1

2

3

4

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

5

Project Allocation

2,000,000

6

7

8

9

(B)  Construction, infrastructure and other

related costs for a reclamation facility

to process flowback fluid associated

with the Marcellus Shale gas drilling

  

10

Project Allocation

7,500,000

11

(18)  Clinton County

  

12

(i)  County Projects

  

13

14

15

16

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

17

Project Allocation

2,000,000

18

(ii)  City of Lock Haven

  

19

20

21

(A)  Construction and other related costs

for the Annie Halenbake Ross Library

renovation project

  

22

Project Allocation

500,000

23

24

25

(B)  Infrastructure and other related costs

to replace the fiber optic network at

Lock Haven University

  

26

Project Allocation

1,950,000

27

28

29

30

(C)  Construction, infrastructure,

redevelopment and other related costs

for the demolition of various buildings

on the Lock Haven University campus

  

- 119 -

 


1

Project Allocation

850,000

2

3

4

5

(D)  Construction, infrastructure,

redevelopment and other related costs to

renovate Lock Haven University's Ulmer

South Hall

  

6

Project Allocation

4,700,000

7

(iii)  Bald Eagle Township

  

8

9

10

11

(A)  Construction, infrastructure and other

related costs for the Avery Dennison

Performance Adhesive Center and Pilot

Facility

  

12

Project Allocation

3,250,000

13

(iv)  Renovo Borough

  

14

15

16

(A)  Construction, infrastructure,

redevelopment and other related costs

for Bucktail Medical Center improvements

  

17

Project Allocation

500,000

18

(19)  Columbia County

  

19

(i)  County Projects

  

20

21

22

23

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

24

Project Allocation

2,000,000

25

26

27

(B)  Construction and infrastructure for an

affordable housing project, including

necessary costs

  

28

Project Allocation

3,000,000

29

(20)  Crawford County

  

30

(i)  County Projects

  

- 120 -

 


1

2

3

4

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

5

Project Allocation

2,000,000

6

(ii)  City of Meadville

  

7

8

9

10

11

(A)  Renovation of Meadville Medical Center

for new interventional and imaging

services in the radiology and cardiology

departments, including construction,

infrastructure and other related costs

  

12

Project Allocation

1,100,000

13

(21)  Cumberland County

  

14

(i)  County Projects

  

15

16

17

18

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

19

Project Allocation

5,000,000

20

(ii)  East Pennsboro Township

  

21

22

23

(A)  Acquisition, renovations and

construction of a new facility for

Highmark Blue Shield

  

24

Project Allocation

4,000,000

25

(22)  Dauphin County

  

26

(i)  County Projects

  

27

28

29

30

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

- 121 -

 


1

Project Allocation

5,000,000

2

(ii)  City of Harrisburg

  

3

4

5

6

(A)  Acquisition, infrastructure,

construction and other related costs for

construction of a Pennsylvania State

Firefighters Memorial

  

7

Project Allocation

500,000

8

9

10

(B)  Redevelopment of the Furlow Building on

North Third Street in the Midtown

section of Harrisburg

  

11

Project Allocation

4,000,000

12

13

14

15

(C)  Construction, infrastructure,

redevelopment and other related costs

for the PinnacleHealth Harrisburg

Hospital campus

  

16

Project Allocation

30,000,000

17

18

19

20

(D)  Acquisition, construction,

infrastructure, redevelopment and other

related costs for a supermarket project

at 29th Street and Rudy Road

  

21

Project Allocation

5,000,000

22

(iii)  Derry Township

  

23

24

25

(A)  Construction of children's hospital at

Penn State Milton S. Hershey Medical

Center, including related costs

  

26

Project Allocation

10,500,000

27

28

29

(B)  Acquisition and construction of fire

station for the Hershey Volunteer Fire

Department, including related costs

  

30

Project Allocation

5,400,000

- 122 -

 


1

2

3

(C)  Acquisition of trolley car barn for the

Derry Township Historical Society,

including related costs

  

4

Project Allocation

4,500,000

5

(iv)  Halifax Township

  

6

7

8

(A)  Construction and improvements to Fort

Halifax Park, including acquisition of

land and other related costs

  

9

Project Allocation

5,000,000

10

(v)  Lower Swatara Township

  

11

12

13

(A)  Construction of a mass transit station

and shopping facility, including

infrastructure and other related costs

  

14

Project Allocation

10,600,000

15

(23)  Delaware County

  

16

(i)  County Projects

  

17

18

19

20

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

21

Project Allocation

5,000,000

22

(ii)  City of Chester

  

23

24

25

26

27

(A)  Rehabilitation and enhancement to the

Union Square Neighborhood Revitalization

District including blight removal,

streetscape, remediation and new

construction

  

28

Project Allocation

10,000,000

29

(iii)  Bethel Township

  

30

(A)  Construction and infrastructure for an

  

- 123 -

 


1

industrial facility

2

Project Allocation

1,500,000

3

(iv)  Haverford Township

  

4

5

6

(A)  Construction, infrastructure and other

related costs for a community

recreation/environmental facility

  

7

Project Allocation

4,000,000

8

(v)  Lansdowne Borough

  

9

10

11

12

(A)  Restoration of the historic Lansdowne

Theater and 20 Lansdowne Court,

including construction and other related

costs

  

13

Project Allocation

3,000,000

14

(vi)  Marple Township

  

15

16

17

(A)  Construction of a new township

government facility, including related

costs

  

18

Project Allocation

1,000,000

19

(vii)  Radnor Township

  

20

21

22

23

24

25

(A)  Acquisition of land from Valley Forge

Military Academy for the purpose of

developing an arts-centered educational

program for college students with

Asperger's Syndrome at Eastern

University, including related costs

  

26

Project Allocation

2,000,000

27

(viii)  Rutledge Borough and Morton Borough

  

28

29

30

(A)  Acquisition, construction,

infrastructure, redevelopment and other

related costs for a firehouse

  

- 124 -

 


1

consolidation project

2

Project Allocation

750,000

3

(ix)  Springfield Township

  

4

5

6

7

(A)  Major upgrade to electrical

distribution system at Springfield

Hospital, including construction,

infrastructure and related costs

  

8

Project Allocation

2,100,000

9

(x)  Upland Borough

  

10

11

12

13

(A)  Upgrade of central health and cooling

systems for Crozer-Keystone Health

System, including construction,

infrastructure and other related costs

  

14

Project Allocation

3,200,000

15

(xi)  Upper Providence Township

  

16

17

18

19

(A)  Construction, infrastructure,

redevelopment and other related costs

for Brookhaven Municipal Building

renovations

  

20

Project Allocation

500,000

21

(24)  Elk County

  

22

(i)  County Projects

  

23

24

25

26

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

27

Project Allocation

2,000,000

28

(25)  Erie County

  

29

(i)  County Projects

  

30

(A)  Acquisition, construction,

  

- 125 -

 


1

2

3

infrastructure and other related costs

for an economic development project in

the county

4

Project Allocation

5,000,000

5

(ii)  City of Erie

  

6

7

8

(A)  Acquisition, remediation, construction,

renovation and other related costs for

an industrial facility

  

9

Project Allocation

2,000,000

10

11

12

(B)  Acquisition, remediation, construction,

renovation and other related costs for a

manufacturing facility

  

13

Project Allocation

2,000,000

14

15

16

(C)  Construction, redevelopment and other

related costs for the Blasco Library

parking project

  

17

Project Allocation

1,000,000

18

19

20

(D)  Construction, redevelopment and other

related costs for the Pleasant Ridge

Manor replacement project

  

21

Project Allocation

1,000,000

22

23

24

25

(E)  Acquisition, construction,

infrastructure, redevelopment and other

related costs for the Rexam Warehouse

Facility expansion project

  

26

Project Allocation

3,000,000

27

28

29

30

(F)  Acquisition, infrastructure, abatement

of hazardous materials and other related

costs for the Bayfront Convention Center

Brownfield Site redevelopment project

  

- 126 -

 


1

Project Allocation

6,500,000

2

3

4

5

(G)  Acquisition, construction,

infrastructure, redevelopment and other

related costs for the Mid-Town

revitalization project

  

6

Project Allocation

2,000,000

7

8

9

(H)  Construction, infrastructure,

redevelopment and other related costs

for the SafeNet Big Backyard project

  

10

Project Allocation

1,000,000

11

12

13

14

(I)  Construction, infrastructure,

redevelopment and other related costs

for the Perry Square revitalization

project

  

15

Project Allocation

1,100,000

16

17

18

19

(J)  Acquisition, construction,

redevelopment and other related costs

for the Erie Metropolitan Transit

Authority Facility

  

20

Project Allocation

3,000,000

21

22

23

(K)  Construction, infrastructure and other

related costs for a new academic

building at Mercyhurst College

  

24

Project Allocation

3,500,000

25

(26)  Fayette County

  

26

(i)  County Projects

  

27

28

29

30

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

- 127 -

 


1

Project Allocation

2,000,000

2

(ii)  South Connellsville Borough

  

3

4

5

6

7

(A)  Acquisition, construction,

infrastructure, redevelopment and other

related costs for the former Anchor

Glass Container Corporation

redevelopment project

  

8

Project Allocation

2,500,000

9

(27)  Forest County

  

10

(i)  County Projects

  

11

12

13

14

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

15

Project Allocation

2,000,000

16

(28)  Franklin County

  

17

(i)  County Projects

  

18

19

20

21

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

22

Project Allocation

2,000,000

23

(ii)  Antrim Township

  

24

25

26

(A)  Construction, renovations and

infrastructure improvements for an

industrial facility

  

27

Project Allocation

2,000,000

28

(iii)  Chambersburg Borough

  

29

30

(A)  Acquisition, construction and other

related costs of a mixed use

  

- 128 -

 


1

2

3

4

hotel/commercial building in the

downtown square bounded by Montgomery

Alley, Central Avenue, Burhart Avenue

and Black Avenue

5

Project Allocation

7,000,000

6

7

8

9

(B)  Acquisition and construction of a

victim services facility for Women In

Need, including infrastructure and other

related costs

  

10

Project Allocation

5,000,000

11

(iv)  Shippensburg Borough

  

12

13

14

(A)  Construction, renovations and

infrastructure improvements for an

industrial facility

  

15

Project Allocation

2,000,000

16

(v)  Southampton Township

  

17

18

19

(A)  Construction, renovations and

infrastructure improvements for an

industrial facility

  

20

Project Allocation

2,000,000

21

(29)  Fulton County

  

22

(i)  County Projects

  

23

24

25

26

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

27

Project Allocation

2,000,000

28

(30)  Greene County

  

29

(i)  County Projects

  

30

(A)  Acquisition, construction,

  

- 129 -

 


1

2

3

infrastructure and other related costs

for an economic development project in

the county

4

Project Allocation

2,000,000

5

(31)  Huntingdon County

  

6

(i)  County Projects

  

7

8

9

10

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

11

Project Allocation

2,000,000

12

13

14

15

16

(B)  Acquisition and rehabilitation of the

ROW, all historic landmark buildings and

locomotives and equipment to operating

capability for the East Broad Top

Railroad

  

17

Project Allocation

33,000,000

18

(ii)  Huntingdon Borough

  

19

20

(A)  Renovation of the Huntingdon County

Library, including related costs

  

21

Project Allocation

4,000,000

22

23

24

(B)  Construction of a new addition to the

Halbritter Center at Juniata College,

including related costs

  

25

Project Allocation

6,000,000

26

27

28

29

(C)  Construction of a multipurpose, multi-

use conference and lodging center on the

campus of Juniata College, including

related costs

  

30

Project Allocation

8,000,000

- 130 -

 


1

2

3

(D)  Renovation of Brumbaugh Academic Center

at Juniata College, including related

costs

  

4

Project Allocation

10,000,000

5

6

7

(E)  Construction of an athletic field house

on the campus of Juniata College,

including related costs

  

8

Project Allocation

10,000,000

9

10

11

12

(F)  Construction of an addition to the

Carnegie Museum of Art by Juniata

College to add a modern conservatory and

curatorial, including related costs

  

13

Project Allocation

5,000,000

14

15

16

(G)  Construction of a new natatorium

complex for Juniata College, including

related costs

  

17

Project Allocation

6,000,000

18

(32)  Indiana County

  

19

(i)  County Projects

  

20

21

22

23

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

24

Project Allocation

2,000,000

25

(ii)  Indiana Township

  

26

27

28

29

30

(A)  Acquisition, construction,

infrastructure, abatement of hazardous

materials and other related costs for

the Indiana Township Town Hall and

Community Center

  

- 131 -

 


1

Project Allocation

1,000,000

2

(33)  Jefferson County

  

3

(i)  County Projects

  

4

5

6

7

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

8

Project Allocation

2,000,000

9

(34)  Juniata County

  

10

(i)  County Projects

  

11

12

13

14

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

15

Project Allocation

2,000,000

16

(35)  Lackawanna County

  

17

(i)  County Projects

  

18

19

20

21

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

22

Project Allocation

5,000,000

23

(ii)  City of Scranton

  

24

25

26

27

(A)  Acquisition, construction,

infrastructure and other related costs

for an athletic field complex at

Lackawanna College

  

28

Project Allocation

7,000,000

29

30

(B)  Construction, infrastructure and other

related costs for renovations to the

  

- 132 -

 


1

Allied Services Skilled Nursing Center

2

Project Allocation

1,000,000

3

(iii)  Moscow Borough

  

4

5

6

(A)  Construction, infrastructure and other

related costs to revitalize the Main

Street downtown district

  

7

Project Allocation

500,000

8

9

(B)  Construction of the new North Pocono

Public Library, including related costs

  

10

Project Allocation

2,500,000

11

(iv)  South Abington Township

  

12

13

14

(A)  Acquisition, construction,

infrastructure and other related costs

for the Kempton Athletic Center

  

15

Project Allocation

4,012,000

16

(36)  Lancaster County

  

17

(i)  County Projects

  

18

19

20

21

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

22

Project Allocation

5,000,000

23

24

25

26

27

28

29

(B)  Acquisition, clearing, demolition,

renovation, environmental remediation,

construction, infrastructure, streets,

utilities and other costs associated

with the Lancaster Northwest Gateway

Project, including construction of

health care and college facilities

  

30

Project Allocation

20,000,000

- 133 -

 


1

(ii)  City of Lancaster

  

2

3

4

5

(A)  Construction and other related costs of

a commercial/retail development at

College Hill at North Charlotte Street

and Harrisburg Pike

  

6

Project Allocation

2,500,000

7

8

9

10

(B)  Construction, infrastructure,

redevelopment and other related costs

for a neighborhood recreation and

revitalization project

  

11

Project Allocation

2,000,000

12

13

14

15

(C)  Construction, infrastructure,

redevelopment and other related costs

for an economic development project near

the Lancaster County Convention Center

  

16

Project Allocation

10,000,000

17

18

19

20

(D)  Construction, infrastructure,

redevelopment and other related costs

for the Manor Street Corridor economic

development project

  

21

Project Allocation

10,000,000

22

23

24

25

(E)  Construction, infrastructure and other

related costs to redevelop the Lancaster

Press building and construct a parking

garage

  

26

Project Allocation

6,000,000

27

28

29

30

(F)  Acquisition, construction,

infrastructure and other related costs

for the Lancaster Square redevelopment

project

  

- 134 -

 


1

Project Allocation

15,000,000

2

3

4

(G)  Construction, infrastructure and other

related costs for the Market District

redevelopment project

  

5

Project Allocation

4,000,000

6

7

8

9

(H)  Construction, infrastructure,

redevelopment and other related costs

for the Conestoga River Plaza economic

development project

  

10

Project Allocation

7,500,000

11

12

13

14

(I)  Construction, infrastructure and other

related costs for the Lancaster General

Hospital Energy Center redevelopment

project

  

15

Project Allocation

2,000,000

16

17

18

(J)  Construction, infrastructure and other

related costs for the Lancaster General

Health Cancer Center expansion project

  

19

Project Allocation

5,000,000

20

21

22

23

(K)  Acquisition, construction,

infrastructure, redevelopment and other

related costs for a Community Workforce

training facility

  

24

Project Allocation

1,000,000

25

26

27

28

(L)  Construction, infrastructure,

redevelopment and other related costs

for the Lancaster City Hall renovation

and expansion project

  

29

Project Allocation

4,500,000

30

(iii)  Lancaster Township

  

- 135 -

 


1

2

3

(A)  Construction and other related costs

for the Lancaster Campus of History

project

  

4

Project Allocation

7,000,000

5

(37)  Lawrence County

  

6

(i)  County Projects

  

7

8

9

10

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

11

Project Allocation

2,000,000

12

(ii)  Borough of Ellwood City

  

13

14

15

(A)  Construction, infrastructure,

redevelopment and other related costs

for Ellwood City Hospital renovations

  

16

Project Allocation

250,000

17

(iii)  Borough of New Wilmington

  

18

19

20

21

(A)  Renovation of the Hoyt Science Center

at Westminster College, including

construction, infrastructure and other

related costs

  

22

Project Allocation

10,000,000

23

(iv)  Ellport Borough

  

24

25

26

27

(A)  Acquisition, construction,

infrastructure, redevelopment and other

related costs for the Ellport Area

Industrial revitalization project

  

28

Project Allocation

1,000,000

29

(v)  Taylor Township

  

30

(A)  Construction, infrastructure,

  

- 136 -

 


1

2

redevelopment and other related costs

for an industrial redevelopment project

3

Project Allocation

2,000,000

4

(38)  Lebanon County

  

5

(i)  County Projects

  

6

7

8

9

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

10

Project Allocation

2,000,000

11

(39)  Lehigh County

  

12

(i)  County Projects

  

13

14

15

16

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

17

Project Allocation

5,000,000

18

19

20

(B)  Construction, renovations and

infrastructure improvements for an

industrial facility

  

21

Project Allocation

5,000,000

22

23

24

25

26

27

28

29

(C)  Construction of a science/technology

and educational aerospace theme park

network designed to foster business

partnerships for the development of an

industrial park and tourism at a Lehigh

Valley International Airport facility,

including acquisition, infrastructure

and other related costs

  

30

Project Allocation

5,000,000

- 137 -

 


1

(ii)  City of Allentown

  

2

3

4

(A)  Infrastructure, construction and other

related costs for a waste-to-energy

facility

  

5

Project Allocation

2,000,000

6

7

8

(B)  Acquisition, construction and

infrastructure for Haven House,

including related costs

  

9

Project Allocation

750,000

10

11

12

13

(C)  Construction of a veterans sanctuary, a

division of Treatment Trends, Inc., to

provide treatment for addiction and co-

occurring symptoms for veterans

  

14

Project Allocation

1,000,000

15

16

17

18

(D)  Acquisition, construction,

infrastructure and other related costs

for the Good Shepherd Comprehensive

Continuing Care Hospital

  

19

Project Allocation

30,000,000

20

21

22

23

(E)  Capital improvements and stage

reconstruction for Allentown Symphony

Hall, including construction and other

related costs

  

24

Project Allocation

500,000

25

26

27

28

29

(F)  Acquisition, construction,

infrastructure, abatement of hazardous

materials and other related costs to

redevelop a former industrial site near

Coca Cola Park

  

30

Project Allocation

10,000,000

- 138 -

 


1

2

3

4

5

6

(G)  Acquisition, construction,

infrastructure, abatement of hazardous

materials, redevelopment and other

related costs for an infant-toddler and

family center at the Donley Children's

Campus

  

7

Project Allocation

2,500,000

8

9

10

11

12

(H)  Acquisition, construction,

infrastructure, abatement of hazardous

materials and other related costs for

the redevelopment of the former

Neuweiler Brewery

  

13

Project Allocation

10,000,000

14

15

16

17

(I)  Acquisition, construction,

infrastructure, redevelopment and other

related costs for the Allentown Symphony

Hall

  

18

Project Allocation

5,000,000

19

20

21

22

23

(J)  Acquisition, construction,

infrastructure and other related costs

to redevelop properties on North 7th

Street, north of Linden Street, and

surrounding areas

  

24

Project Allocation

5,000,000

25

26

27

28

(K)  Acquisition, construction,

infrastructure and other related costs

to redevelop properties in the 1st and

6th Wards along the Lehigh River

  

29

Project Allocation

15,000,000

30

(L)  Acquisition, construction,

  

- 139 -

 


1

2

3

4

infrastructure, redevelopment and other

related costs for a mixed-use commercial

and residential community in Old

Allentown

5

Project Allocation

5,000,000

6

7

8

9

(M)  Acquisition, construction,

infrastructure and other related costs

for an educational and student building

at Muhlenberg College

  

10

Project Allocation

1,500,000

11

12

13

14

15

(N)  Construction, redevelopment and other

related costs to relocate and expand the

Lehigh Valley Health Network's

Outpatient Pediatric Clinic at 17th and

Chew Streets

  

16

Project Allocation

700,000

17

18

19

20

21

(O)  Acquisition, construction,

infrastructure, redevelopment and other

related costs for the development of a

mixed-use commercial and residential

community in Jordan Heights

  

22

Project Allocation

5,000,000

23

24

25

26

(P)  Acquisition, construction,

infrastructure and other related costs

to redevelop properties on South Hall

Street

  

27

Project Allocation

1,000,000

28

29

30

(Q)  Acquisition, construction,

infrastructure and other related costs

to redevelop properties on North 7th

  

- 140 -

 


1

2

Street, south of Linden Street, and

surrounding areas

3

Project Allocation

5,000,000

4

5

6

(R)  Acquisition, construction,

infrastructure and other related costs

to redevelop the Americus Hotel

  

7

Project Allocation

10,000,000

8

9

10

11

(S)  Acquisition, construction,

infrastructure and other related costs

to redevelop the area along the 900

block of Hamilton Street

  

12

Project Allocation

2,500,000

13

14

15

16

(T)  Acquisition, construction,

infrastructure and other related costs

to redevelop the area along the 800

block of Hamilton Street

  

17

Project Allocation

2,500,000

18

19

20

21

(U)  Acquisition, construction,

infrastructure and other related costs

to redevelop the area along the 700

block of Hamilton Street

  

22

Project Allocation

2,500,000

23

24

25

26

(V)  Acquisition, construction,

infrastructure and other related costs

to redevelop the area along the 600

block of Hamilton Street

  

27

Project Allocation

2,500,000

28

29

30

(W)  Acquisition, construction,

infrastructure and other related costs

to redevelop the area along the 500

  

- 141 -

 


1

block of Hamilton Street

2

Project Allocation

2,500,000

3

4

5

6

(X)  Construction, infrastructure and other

related costs for the development of an

educational space and other commercial

enterprises

  

7

Project Allocation

2,500,000

8

9

10

(Y)  Acquisition and construction of The

Hill's import site, including related

costs

  

11

Project Allocation

2,000,000

12

(iii)  City of Bethlehem

  

13

14

15

16

17

(A)  Construction, infrastructure,

redevelopment and other related costs to

renovate and expand the Emergency

Department at Lehigh Valley Health

Network - Muhlenberg Hospital

  

18

Project Allocation

2,000,000

19

(iv)  Catasauqua Borough

  

20

21

22

23

24

(A)  Acquisition, construction,

infrastructure, abatement of hazardous

materials and other related costs for

the redevelopment of a former industrial

site

  

25

Project Allocation

10,000,000

26

(v)  Emmaus Borough

  

27

28

29

30

(A)  Acquisition and renovation of a

facility to house the Emmaus Historical

Society, including construction,

infrastructure, redevelopment and other

  

- 142 -

 


1

related costs

2

Project Allocation

1,500,000

3

4

5

6

7

(B)  Acquisition of property to house the

Emmaus Main Street Program offices and

other facilities, including

redevelopment, infrastructure and other

related costs

  

8

Project Allocation

500,000

9

(vi)  Fountain Hill Borough

  

10

11

12

13

14

(A)  Construction, infrastructure, abatement

of hazardous materials, redevelopment

and other related costs for The Medical

School of Temple University/St. Luke's

Hospital and Health Network

  

15

Project Allocation

10,000,000

16

(vii)  Lower Macungie Township

  

17

18

19

(A)  Renovation of existing facilities and

construction of new amenities at Camp

Olympic, including related costs

  

20

Project Allocation

601,000

21

22

23

(B)  Acquisition and construction for the

Intermunicipal Green Belt Improvement

Program, including related costs

  

24

Project Allocation

625,000

25

(viii)  Lynn Township

  

26

27

28

29

(A)  Redevelopment of the Ontelaunee Park,

including acquisition, construction,

infrastructure, abatement of hazardous

materials and other related costs

  

30

Project Allocation

500,000

- 143 -

 


1

(ix)  North Whitehall Township

  

2

3

4

5

(A)  Construction of a veterinary technology

lab and veterinary clinic at Lehigh

Carbon Community College in conjunction

with the Lehigh Valley Zoo

  

6

Project Allocation

1,250,000

7

8

9

(B)  Construction of a Communiversity Center

at Lehigh Carbon Community College,

including related costs

  

10

Project Allocation

650,000

11

(x)  Salisbury Township

  

12

13

14

15

(A)  Acquisition and construction of a youth

recreation and gym facility for the

Salisbury Youth Association, including

related costs

  

16

Project Allocation

500,000

17

18

19

20

21

(B)  Construction of an addition to and

renovation of Salisbury Township police

facility, including abatement of

hazardous materials, infrastructure and

other related costs

  

22

Project Allocation

1,000,000

23

(xi)  Upper Macungie Township

  

24

25

(A)  Construction of a municipal police

station, including related costs

  

26

Project Allocation

1,000,000

27

28

(B)  Redevelopment of commercial property,

including necessary costs

  

29

Project Allocation

1,000,000

30

(xii)  Upper Saucon Township

  

- 144 -

 


1

2

(A)  Infrastructure for Lutron Electronics

business park, including related costs

  

3

Project Allocation

750,000

4

5

6

(B)  Construction, renovations and

infrastructure improvements for an

office facility

  

7

Project Allocation

10,000,000

8

(xiii)  Weisenberg Township

  

9

10

11

(A)  Construction of a community center for

use by multiple municipalities,

including necessary costs

  

12

Project Allocation

2,200,000

13

(40)  Luzerne County

  

14

(i)  County Projects

  

15

16

17

18

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

19

Project Allocation

5,000,000

20

(ii)  City of Hazleton

  

21

22

23

(A)  Construction, infrastructure and other

related costs for Hazleton Area Public

Library renovations

  

24

Project Allocation

1,000,000

25

(iii)  City of Wilkes-Barre

  

26

27

28

(A)  Acquisition, construction and other

related costs for an indoor recreational

facility at King's College

  

29

Project Allocation

3,000,000

30

(B)  Construction and other related costs

  

- 145 -

 


1

2

3

for the redevelopment of the former

Sterling Hotel property in downtown

Wilkes-Barre

4

Project Allocation

10,000,000

5

(iv)  Ashley Borough

  

6

7

8

(A)  Acquisition, demolition, construction

and other related costs to redevelop 56

Main Street

  

9

Project Allocation

500,000

10

11

(B)  Construction, infrastructure and other

related costs for a new borough building

  

12

Project Allocation

2,750,000

13

14

15

16

(C)  Acquisition, construction,

infrastructure and other related costs

for the Huber Breaker Preservation

Society Park

  

17

Project Allocation

500,000

18

19

20

(D)  Construction, abatement of hazardous

materials and other related costs to

redevelop the Q-Stick property

  

21

Project Allocation

1,000,000

22

23

24

(E)  Construction, redevelopment and other

related costs for Conyngham Street Park

improvements

  

25

Project Allocation

500,000

26

27

28

(F)  Acquisition, demolition, construction

and other related costs to redevelop

61-63 Main Street

  

29

Project Allocation

1,000,000

30

(G)  Acquisition, demolition and other

  

- 146 -

 


1

2

related costs to redevelop the area

along 65-71 Mary Street

3

Project Allocation

500,000

4

5

6

(H)  Acquisition, demolition, construction

and other related costs for the Main

Street renovation project

  

7

Project Allocation

1,000,000

8

9

10

(I)  Acquisition, construction and other

related costs to redevelop the Carosel

Printing building

  

11

Project Allocation

500,000

12

13

14

(J)  Acquisition, demolition, construction

and other related costs to redevelop 122

Main Street

  

15

Project Allocation

500,000

16

17

18

(K)  Acquisition, demolition, construction

and other related costs to redevelop

property at 23 High Street

  

19

Project Allocation

500,000

20

21

22

(L)  Acquisition, construction and other

related costs to redevelop the former

Sony site

  

23

Project Allocation

500,000

24

25

26

(M)  Acquisition, demolition, construction

and other related costs to redevelop

44-46 Fall Street

  

27

Project Allocation

500,000

28

29

30

(N)  Acquisition, demolition, construction

and other related costs to redevelop 48

Fall Street

  

- 147 -

 


1

Project Allocation

500,000

2

(v)  Dallas Borough

  

3

4

5

6

(A)  Construction and other related costs

for the redevelopment of an abandoned

historic former school house on Church

Street

  

7

Project Allocation

5,000,000

8

(vi)  Jenkins Township

  

9

10

11

(A)  Construction, renovations and

infrastructure improvements for an

industrial facility

  

12

Project Allocation

1,000,000

13

(vii)  Plains Township

  

14

15

16

17

(A)  Acquisition, demolition, construction

and other related costs to redevelop

properties along South River and Maffett

Streets

  

18

Project Allocation

500,000

19

20

21

(B)  Acquisition, demolition, construction

and other related costs to redevelop

properties along Main and Carey Streets

  

22

Project Allocation

800,000

23

24

25

(C)  Construction and other related costs to

expand, remodel and upgrade the

township's police department

  

26

Project Allocation

800,000

27

(viii)  West Pittston Borough

  

28

29

30

(A)  Acquisition, construction,

infrastructure and other related costs

to build the new West Pittston Library

  

- 148 -

 


1

Project Allocation

2,000,000

2

(ix)  Wilkes-Barre Township

  

3

4

5

(A)  Construction, infrastructure and other

related costs for a new municipal

building

  

6

Project Allocation

500,000

7

(41)  Lycoming County

  

8

(i)  County Projects

  

9

10

11

12

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

13

Project Allocation

2,000,000

14

(ii)  City of Williamsport

  

15

16

17

(A)  Construction, infrastructure and other

related costs for the Susquehanna Health

medical office building

  

18

Project Allocation

7,500,000

19

20

21

(B)  Construction, infrastructure,

redevelopment and other related costs to

build a community center

  

22

Project Allocation

5,000,000

23

24

(C)  Construction and other related costs to

replace the Lycoming Engines warehouse

  

25

Project Allocation

2,280,000

26

27

28

29

(D)  Acquisition, construction,

infrastructure, redevelopment and other

related costs for the Eureka Place

development project

  

30

Project Allocation

7,000,000

- 149 -

 


1

2

3

(E)  Construction, acquisition,

infrastructure and other related costs

to redevelop the William Street area

  

4

Project Allocation

2,500,000

5

(42)  McKean County

  

6

(i)  County Projects

  

7

8

9

10

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

11

Project Allocation

2,000,000

12

(43)  Mercer County

  

13

(i)  County Projects

  

14

15

16

17

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

18

Project Allocation

2,000,000

19

(ii)  City of Sharon

  

20

21

22

(A)  Expansion of the Sharon Regional

Medical Center, including construction

of a parking garage

  

23

Project Allocation

10,000,000

24

25

26

27

28

(B)  Acquisition, construction,

infrastructure, redevelopment and other

related costs for an urban neighborhood

revitalization project near the campus

of the Sharon Regional Health System

  

29

Project Allocation

10,000,000

30

(44)  Mifflin County

  

- 150 -

 


1

(i)  County Projects

  

2

3

4

5

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

6

Project Allocation

2,000,000

7

(45)  Monroe County

  

8

(i)  County Projects

  

9

10

11

12

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

13

Project Allocation

2,000,000

14

(ii)  Chestnuthill, Eldred and Polk Townships

  

15

16

17

18

(A)  Acquisition, construction,

infrastructure, redevelopment and other

related costs for the West End economic

development project

  

19

Project Allocation

2,500,000

20

(iii)  Coolbaugh Township

  

21

22

(A)  Construction of an access road to the

Pocono Mountains Corporate Center South

  

23

Project Allocation

3,000,000

24

25

26

27

(B)  Redevelopment of the Pocono Mountains

Corporate Center East, including

construction, infrastructure and other

related costs

  

28

Project Allocation

4,000,000

29

30

(C)  Development of rail-served business

park in Coolbaugh Township, including

  

- 151 -

 


1

2

construction, infrastructure and other

related costs

3

Project Allocation

3,000,000

4

(iv)  Delaware Water Gap Borough

  

5

6

7

(A)  Construction, infrastructure and other

related costs to redevelop the former

Laird Technologies building

  

8

Project Allocation

6,000,000

9

10

11

(B)  Construction, infrastructure,

redevelopment and other related costs

for Castle Inn restorations

  

12

Project Allocation

1,000,000

13

(v)  East Stroudsburg Borough

  

14

15

16

17

(A)  Demolition, redevelopment and

construction of the former International

Boiler Works building, including

infrastructure and other related costs

  

18

Project Allocation

3,000,000

19

20

21

22

(B)  Construction and infrastructure related

to the development of a work-class

synchronous data center, including

related costs

  

23

Project Allocation

3,000,000

24

(vi)  Mount Pocono Borough

  

25

26

27

(A)  Construction, infrastructure,

rehabilitation and other costs related

to dam replacement at Stillwater Lake

  

28

Project Allocation

2,500,000

29

(vii)  Pocono Township

  

30

(A)  Construction of a hotel and indoor

  

- 152 -

 


1

2

waterpark, including infrastructure and

other related costs

3

Project Allocation

10,000,000

4

5

(viii)  Pocono, Coolbaugh and Tunkhannock

Townships

  

6

7

8

(A)  Development of the Route 611 Corridor

Gasoline Project, including

infrastructure and other related costs

  

9

Project Allocation

10,000,000

10

(ix)  Smithfield Township

  

11

12

13

(A)  Construction, infrastructure and other

related costs for a resort complex,

including a conference center

  

14

Project Allocation

10,000,000

15

(x)  Stroudsburg Borough

  

16

17

18

19

20

(A)  Acquisition and renovation of a

downtown Stroudsburg hotel and

construction of an associated parking

garage, including infrastructure and

other related costs

  

21

Project Allocation

5,000,000

22

(xi)  Tobyhanna Township

  

23

24

25

26

(A)  Construction, infrastructure,

redevelopment and other related costs

for improvements at New Ventures

Commercial Park

  

27

Project Allocation

3,000,000

28

(46)  Montgomery County

  

29

(i)  County Projects

  

30

(A)  Acquisition, construction,

  

- 153 -

 


1

2

3

infrastructure and other related costs

for an economic development project in

the county

4

Project Allocation

5,000,000

5

(ii)  Abington Township

  

6

7

8

9

(A)  Construction, infrastructure and other

related costs for the Abington Memorial

Hospital Neonatal Intensive Care Unit

expansion project

  

10

Project Allocation

1,000,000

11

12

13

(B)  Construction, infrastructure and other

related costs for a neurosciences

institute at Abington Memorial Hospital

  

14

Project Allocation

2,000,000

15

16

17

18

19

(C)  Construction, infrastructure,

redevelopment and other related costs

for the Holy Redeemer Hospital and

Medical Center Cancer Program

enhancements

  

20

Project Allocation

2,000,000

21

22

23

24

25

(D)  Construction, infrastructure,

redevelopment and other related costs

for the Holy Redeemer Hospital and

Medical Center Neonatal Intensive Care

Unit expansion project

  

26

Project Allocation

2,500,000

27

28

29

(E)  Construction, infrastructure and other

related costs for Roychester Community

House renovations

  

30

Project Allocation

280,000

- 154 -

 


1

2

3

4

(F)  Construction, infrastructure and other

related costs for the Holy Redeemer

Hospital and Medical Center St. Joseph's

Manor renovation project

  

5

Project Allocation

2,100,000

6

(iii)  Ambler Borough

  

7

8

9

10

(A)  Acquisition, construction,

infrastructure and other related costs

for a police and municipal service

complex

  

11

Project Allocation

1,000,000

12

(iv)  Conshohocken Borough

  

13

14

(A)  Construction and other related costs to

redevelop the Verizon building

  

15

Project Allocation

2,000,000

16

17

18

(B)  Construction, redevelopment and other

related costs for the Conshohocken Train

Station and parking garage

  

19

Project Allocation

3,000,000

20

(v)  Hatboro Borough

  

21

22

23

(A)  Renovation of the Hatboro Police

Administration Building, including

construction and other related costs

  

24

Project Allocation

500,000

25

(vi)  Lower Merion Township

  

26

27

28

(A)  Construction, redevelopment and other

related costs for Ashbridge Memorial

Park improvements

  

29

Project Allocation

1,000,000

30

(B)  Construction and other related costs

  

- 155 -

 


1

2

for the Lankenau Hospital expansion

project

3

Project Allocation

25,000,000

4

(vii)  Lower Salford Township

  

5

6

7

8

(A)  Construction, infrastructure,

redevelopment and other related costs

for the Harleysville Area Emergency

Medical Services headquarters

  

9

Project Allocation

750,000

10

11

12

(B)  Construction, redevelopment and other

related costs for a community center

expansion and renovation project

  

13

Project Allocation

250,000

14

(viii)  Norristown Borough

  

15

16

17

18

19

(A)  Acquisition, construction and other

related costs for a mixed use

commercial/retail development within the

boundary of Fornance Street, Wood Street

and Locust Street

  

20

Project Allocation

10,000,000

21

22

23

(B)  Construction and other related costs

for the redevelopment of the former

Sacred Heart Hospital

  

24

Project Allocation

5,000,000

25

26

27

28

(C)  Construction, infrastructure, abatement

of hazardous materials and other related

costs for the redevelopment of the

Norristown State Hospital grounds

  

29

Project Allocation

100,000,000

30

(D)  Construction, redevelopment and other

  

- 156 -

 


1

2

related costs for the Mission Kids

Center

3

Project Allocation

1,000,000

4

5

6

(E)  Construction, infrastructure and other

related costs for the redevelopment of

the former Montgomery Hospital location

  

7

Project Allocation

10,000,000

8

9

(F)  Construction, redevelopment and other

related costs for the Elmwood Park Zoo

  

10

Project Allocation

2,000,000

11

(ix)  Souderton Borough

  

12

13

14

15

(A)  Renovation of the Souderton Train

Station and associated freight building

and wait station, including necessary

costs

  

16

Project Allocation

1,000,000

17

(x)  Upper Dublin Township

  

18

19

20

(A)  Acquisition, construction,

infrastructure and other related costs

for Stern Academy Community Center

  

21

Project Allocation

1,500,000

22

(xi)  Upper Merion Township

  

23

24

25

(A)  Construction, renovations and

infrastructure improvements for an

industrial facility

  

26

Project Allocation

1,500,000

27

28

29

(B)  Construction, infrastructure and other

related costs for the King of Prussia

Studio

  

30

Project Allocation

2,500,000

- 157 -

 


1

2

3

4

(C)  Acquisition, construction,

infrastructure, redevelopment and other

related costs for the Village at Valley

Forge

  

5

Project Allocation

25,000,000

6

(xii)  Whitemarsh Borough

  

7

8

(A)  Construction and other related costs to

redevelop the former Magarity Site

  

9

Project Allocation

1,000,000

10

(xiii)  Whitemarsh Township

  

11

12

13

14

(A)  Construction, infrastructure,

redevelopment and other related costs

for Hope Lodge expansion and

improvements

  

15

Project Allocation

1,000,000

16

17

18

19

(B)  Construction, infrastructure,

redevelopment and other related costs

for the Lincoln Fire Company expansion

project

  

20

Project Allocation

1,200,000

21

22

23

24

(C)  Construction, redevelopment and other

related costs to convert the Whitemarsh

Township incinerator building into a

fleet building

  

25

Project Allocation

1,000,000

26

27

28

(D)  Construction, infrastructure,

redevelopment and other related costs

for the Highlands Historical Society

  

29

Project Allocation

1,000,000

30

(xiv)  Whitpain Township

  

- 158 -

 


1

2

3

4

(A)  Construction, infrastructure,

redevelopment and other related costs

for the Montgomery County Community

College Science Center

  

5

Project Allocation

1,500,000

6

(47)  Montour County

  

7

(i)  County Projects

  

8

9

10

11

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

12

Project Allocation

2,000,000

13

(48)  Northampton County

  

14

(i)  County Projects

  

15

16

17

18

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

19

Project Allocation

5,000,000

20

21

22

(B)  Construction, renovations and

infrastructure improvements for an

industrial facility

  

23

Project Allocation

5,000,000

24

(ii)  City of Bethlehem

  

25

26

27

(A)  Renovations, construction and other

related costs for property located at

Polk and Third Streets

  

28

Project Allocation

1,200,000

29

30

(B)  Construction, redevelopment and other

related costs to PBS39 at SteelStacks

  

- 159 -

 


1

Project Allocation

4,000,000

2

3

4

5

(C)  Construction, infrastructure,

redevelopment and other related costs to

renovate Collier Hall of Science at

Moravian College

  

6

Project Allocation

14,000,000

7

8

9

10

11

12

(D)  Acquisition, construction,

infrastructure, abatement of hazardous

materials, redevelopment and other

related costs for the renovation and

expansion of the Ben Franklin

TechVentures incubator facility

  

13

Project Allocation

10,000,000

14

15

16

17

(E)  Construction, abatement of hazardous

materials, infrastructure and other

related costs to redevelop the Majestic

Bethlehem Center

  

18

Project Allocation

20,000,000

19

(iii)  City of Easton

  

20

21

22

23

(A)  Acquisition, construction,

redevelopment and other related costs to

rehabilitate the former 6th Street Fire

Station

  

24

Project Allocation

500,000

25

26

27

28

(B)  Acquisition, construction,

redevelopment and other related costs to

rehabilitate the Merchants Bank Building

on Centre Square

  

29

Project Allocation

1,500,000

30

(C)  Acquisition, construction and other

  

- 160 -

 


1

2

related costs to redevelop the Jacobs

Produce Building

3

Project Allocation

1,000,000

4

5

6

7

(D)  Acquisition, construction,

redevelopment and other related costs

for a rehabilitation project at 687

Northampton Street and surrounding areas

  

8

Project Allocation

2,000,000

9

10

11

(E)  Acquisition, construction and other

related costs to redevelop the Governor

Wolf Building into a cultural center

  

12

Project Allocation

2,000,000

13

14

15

(F)  Acquisition, construction,

redevelopment and other related costs to

rehabilitate the Cottingham Building

  

16

Project Allocation

1,500,000

17

18

19

(G)  Construction, infrastructure,

redevelopment and other related costs to

rehabilitate the Bixler Building

  

20

Project Allocation

500,000

21

22

23

24

(H)  Acquisition, construction,

redevelopment and other related costs to

rehabilitate buildings along 5th, 6th

and Northampton Streets

  

25

Project Allocation

2,000,000

26

27

28

29

(I)  Acquisition, construction,

redevelopment and other related costs

for the rehabilitation of the American

Veterans Building

  

30

Project Allocation

500,000

- 161 -

 


1

2

3

4

(J)  Acquisition, construction,

infrastructure, redevelopment and other

related costs for parking and commercial

facilities

  

5

Project Allocation

5,000,000

6

7

8

(K)  Acquisition, construction,

infrastructure and other related costs

for a new police station

  

9

Project Allocation

2,500,000

10

11

12

(L)  Construction, redevelopment and other

related costs to rehabilitate the

Quadrant Book Mart historical building

  

13

Project Allocation

750,000

14

15

16

(M)  Construction, infrastructure,

redevelopment and other related costs to

rehabilitate the former Simon silk mill

  

17

Project Allocation

5,000,000

18

19

20

21

(N)  Acquisition, construction,

redevelopment and other related costs to

rehabilitate 424 Reynolds Street and

surrounding areas

  

22

Project Allocation

1,500,000

23

24

25

26

(O)  Acquisition, construction,

redevelopment and other related costs to

rehabilitate the former St. Michael's

Church site

  

27

Project Allocation

500,000

28

29

30

(P)  Acquisition, construction,

infrastructure and other related costs

to redevelop industrial property in the

  

- 162 -

 


1

2

south side of Easton at Lincoln and Coal

Streets

3

Project Allocation

1,000,000

4

5

6

7

(Q)  Construction, infrastructure,

redevelopment and other related costs

for the State Theatre Center for the

Arts

  

8

Project Allocation

1,500,000

9

10

11

12

(R)  Construction, infrastructure,

redevelopment and other related costs

for an Energy Reduction District at

Lafayette College

  

13

Project Allocation

1,000,000

14

15

16

17

(S)  Acquisition, construction,

redevelopment and other related costs

for the rehabilitation of the historic

A&D Tile Building

  

18

Project Allocation

1,000,000

19

20

21

22

(T)  Construction, infrastructure,

redevelopment and other related costs

for the College Hill Neighborhood

Business Corridor revitalization project

  

23

Project Allocation

2,500,000

24

25

26

(U)  Acquisition, construction and other

related costs for a new City Hall

facility

  

27

Project Allocation

2,500,000

28

29

30

(V)  Construction, infrastructure, abatement

of hazardous materials, redevelopment

and other related costs for the Easton

  

- 163 -

 


1

Area Community Center

2

Project Allocation

1,750,000

3

4

5

6

(W)  Acquisition, construction,

redevelopment and other related costs

for a historic building at 542

Northampton Street and surrounding areas

  

7

Project Allocation

1,000,000

8

9

10

11

(X)  Construction, infrastructure,

redevelopment and other related costs

for rehabilitation projects at 118-120

Northampton Street and surrounding areas

  

12

Project Allocation

500,000

13

14

15

16

(Y)  Construction, infrastructure,

redevelopment and other related costs

for a theater in the city's Bushkill

Corridor

  

17

Project Allocation

500,000

18

(iv)  Bushkill Township

  

19

20

21

22

23

24

(A)  Construction of an outpatient health

mall for St. Luke's Hospital and Health

Network, including acquisition,

redevelopment, infrastructure, abatement

of hazardous materials and other related

costs

  

25

Project Allocation

5,000,000

26

(v)  Freemansburg Borough

  

27

28

29

(A)  Construction, infrastructure and other

related costs for municipal building

renovations

  

30

Project Allocation

1,800,000

- 164 -

 


1

(vi)  Hellertown Borough

  

2

3

4

(A)  Construction, redevelopment and other

related costs for the Saucon Valley

Community and Recreation Center

  

5

Project Allocation

1,800,000

6

(vii)  North Catasauqua Borough

  

7

8

(A)  Renovation of borough hall, including

construction and related costs

  

9

Project Allocation

500,000

10

(viii)  Pen Argyl Borough

  

11

12

13

(A)  Acquisition, construction,

infrastructure, redevelopment and other

related costs for a YMCA

  

14

Project Allocation

1,000,000

15

(ix)  Wilson Borough

  

16

17

18

19

(A)  Construction, redevelopment and other

related costs for an addition to the

borough's municipal building for the

police department

  

20

Project Allocation

500,000

21

(x)  Wilson Borough/City of Easton

  

22

23

24

(A)  Renovations, construction and other

related costs for the former Dixie Cup

Corporation manufacturing facility

  

25

Project Allocation

4,500,000

26

(49)  Northumberland County

  

27

(i)  County Projects

  

28

29

30

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

  

- 165 -

 


1

the county

2

Project Allocation

2,000,000

3

(50)  Perry County

  

4

(i)  County Projects

  

5

6

7

8

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

9

Project Allocation

2,000,000

10

(51)  Philadelphia County

  

11

(i)  County Projects 

  

12

13

14

15

(A)  Remediation, construction and other

related costs for the repair of the dry

dock and for crane removal at the Aker

Philadelphia Shipyard

  

  

  

  

16

Project Allocation

4,000,000

17

18

19

20

(B)  Construction, installation and other

related costs for robotic plate cutting

and marking system at the Aker

Philadelphia Shipyard

  

21

Project Allocation

500,000

22

23

(C)  Construction of a new paint hall at the

Aker Philadelphia Shipyard

  

24

Project Allocation

5,000,000

25

26

27

28

(D)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

29

Project Allocation

10,000,000

30

(ii)  City of Philadelphia

  

- 166 -

 


1

2

(A)  Expansion and renovation of the

National Constitution Center

  

3

Project Allocation

14,000,000

4

5

(B)  Acquisition and development of the

Northwest Sustainability Campus

  

6

Project Allocation

5,500,000

7

8

9

(C)  Acquisition, construction,

infrastructure and other related costs

for the American Revolution Center

  

10

Project Allocation

20,000,000

11

12

13

14

(D)  Acquisition, infrastructure,

construction and other related costs for

an industrial facility at the

Philadelphia Navy Yard

  

15

Project Allocation

30,000,000

16

17

18

19

20

(E)  Acquisition, infrastructure,

construction and other related costs for

a facility at the Philadelphia Navy Yard

for commercial, industrial or

multipurpose use

  

  

21

Project Allocation

5,000,000

22

23

24

25

26

(F)  Construction and other related costs of

a commercial medical office/clinic

building and structured parking within

the boundary of N. Broad, Olney Avenue

and Wagner Avenue

  

  

  

  

  

27

Project Allocation

10,000,000

28

29

30

(G)  Infrastructure improvements and site

preparation for development of the

Philadelphia Navy Yard

  

- 167 -

 


1

Project Allocation

25,000,000

2

3

4

5

6

(H)  Demolition, design, infrastructure,

construction, renovation of existing

buildings and fit out of a mixed-use

hotel and/or condominium development in

the Art Museum area of Philadelphia

  

7

Project Allocation

25,000,000

8

9

10

11

(I)  Demolition, design, infrastructure,

construction and fit out of a mixed-use

development on North Broad Street in

Philadelphia

  

12

Project Allocation

10,000,000

13

14

15

16

17

18

19

20

(J)  Acquisition, clearing, demolition,

renovation, environmental remediation,

construction, infrastructure, design,

streets, utilities and other costs

associated with the development of a

library and classroom facility on, or

adjacent to, the campus of Temple

University

  

21

Project Allocation

100,000,000

22

23

24

25

26

(K)  Demolition, design, infrastructure,

construction, renovation of existing

buildings and fit out of a mixed-use

hotel and parking development adjacent

to the Piazza at Schmidt's

  

27

Project Allocation

45,000,000

28

29

30

(L)  Demolition, design, infrastructure,

construction, renovation of existing

buildings and fit out of a mixed-use

  

- 168 -

 


1

2

hotel and parking facility at 2nd and

Poplar Streets

3

Project Allocation

25,000,000

4

5

6

7

(M)  Demolition, design, infrastructure,

construction, renovation of existing

buildings and fit out of a residential

development at 1400 Spring Garden Street

  

8

Project Allocation

25,000,000

9

10

11

12

13

14

(N)  Construction of a new business building

for Holy Family University at its

Northeast Philadelphia campus, including

acquisition, infrastructure, abatement

of hazardous materials and other related

costs

  

15

Project Allocation

10,000,000

16

17

18

(O)  Construction, redevelopment, and other

related costs for the Frankford Senior

Living Facility

  

19

Project Allocation

850,000

20

21

22

(P)  Construction, infrastructure and other

related costs for the Frankford Friends

School expansion project

  

23

Project Allocation

750,000

24

25

26

27

(Q)  Construction, infrastructure and other

related costs for the expansion and

renovation of the Aria Health Frankford

Campus Emergency Room

  

28

Project Allocation

4,800,000

29

30

(R)  Construction, infrastructure and other

related costs for the ASPIRA school

  

- 169 -

 


1

expansion project

2

Project Allocation

1,910,000

3

4

5

6

(S)  Construction, infrastructure and other

related costs for the restoration and

expansion of the Krauth Memorial Library

at the Lutheran Theological Seminary

  

7

Project Allocation

3,000,000

8

9

10

11

12

(T)  Acquisition, construction,

infrastructure, redevelopment and other

related costs for the Nicetown CDC

Commercial Corridor revitalization

project

  

13

Project Allocation

5,000,000

14

15

16

17

(U)  Acquisition, construction,

infrastructure, redevelopment and other

related costs for the Center in the Park

community café project

  

18

Project Allocation

500,000

19

20

21

(V)  Construction, redevelopment and other

related costs for the Sturgis Playground

redevelopment project

  

22

Project Allocation

1,000,000

23

24

25

26

(W)  Acquisition, construction,

infrastructure, redevelopment and other

related costs for the African American

Museum

  

27

Project Allocation

10,000,000

28

29

30

(X)  Acquisition, construction,

infrastructure and other related costs

for The Plaza at Enterprise Heights

  

- 170 -

 


1

mixed-use development project

2

Project Allocation

10,000,000

3

4

5

(Y)  Construction, redevelopment and other

related costs for the Esperanza

multipurpose community center

  

6

Project Allocation

1,250,000

7

8

9

(Z)  Acquisition, construction and other

related costs for an economic

development project at 22 Jackson Street

  

10

Project Allocation

10,000,000

11

12

13

14

(AA)  Acquisition, construction,

redevelopment and other related costs

for the Northwest Business Campus for

Sustainability

  

15

Project Allocation

5,000,000

16

17

18

19

(BB)  Construction, infrastructure,

redevelopment and other related costs

for the LaSalle University School of

Business reconstruction project

  

20

Project Allocation

12,000,000

21

22

23

(CC)  Acquisition, construction and other

related costs for a charter school at

3601 South Front Street

  

24

Project Allocation

10,000,000

25

26

27

28

(DD)  Construction, infrastructure,

redevelopment and other related costs

for a new Community Legal Services

building

  

29

Project Allocation

5,000,000

30

(EE)  Acquisition, construction,

  

- 171 -

 


1

2

3

redevelopment and other related costs

for the Attic Youth Center expansion

project

4

Project Allocation

2,150,000

5

6

7

8

(FF)  Acquisition, construction and other

related costs for a sports training and

educational center at 22 East Wolf

Street

  

9

Project Allocation

10,000,000

10

11

12

13

(GG)  Acquisition, construction and other

related costs for a training and

education center at 3670 South Lawrence

Street

  

14

Project Allocation

10,000,000

15

16

17

18

19

(HH)  Acquisition, infrastructure,

construction, abatement of hazardous

materials and other related costs for

the Elmwood Commons redevelopment

project

  

20

Project Allocation

5,000,000

21

22

23

24

(II)  Acquisition, construction and other

related costs for an auto repair

workshop training center at 28 Ritner

Street

  

25

Project Allocation

10,000,000

26

27

28

29

(JJ)  Acquisition, construction and other

related costs for a residential housing

project on the 400 block of Cantrell

Street

  

30

Project Allocation

10,000,000

- 172 -

 


1

2

3

(KK)  Construction, acquisition and other

related costs for an economic

development project at 21 Wolf Street

  

4

Project Allocation

10,000,000

5

6

7

8

(LL)  Acquisition, construction and other

related costs for a commercial

manufacturing facility at 38 Jackson

Street

  

9

Project Allocation

10,000,000

10

11

12

13

(MM)  Acquisition, construction and other

related costs for a senior housing

development at 1221-1231 South Broad

Street

  

14

Project Allocation

10,000,000

15

16

17

(NN)  Acquisition, construction and other

related costs for a residential housing

project on the 500 block of Mercy Street

  

18

Project Allocation

10,000,000

19

20

21

(OO)  Construction, redevelopment and other

related costs for the Ogontz Avenue

Streetscape Project

  

22

Project Allocation

2,500,000

23

24

25

(PP)  Construction and other related costs

for a new Life Sciences Building at the

University of Pennsylvania

  

26

Project Allocation

30,000,000

27

28

29

(QQ)  Construction, redevelopment and other

related costs for the Mastery Charter

Schools and Lenfest PAL Center project

  

30

Project Allocation

1,500,000

- 173 -

 


1

2

3

4

(RR)  Construction, infrastructure,

redevelopment and other related costs

for improvements to the Liberty

Resources Market Street facility

  

5

Project Allocation

3,000,000

6

7

8

9

(SS)  Acquisition, construction and other

related costs for a computer and

billboard design training center at 2200

Weccacoe Avenue

  

10

Project Allocation

10,000,000

11

12

13

14

(TT)  Construction, acquisition,

redevelopment and other related costs

for Phase II of the Lancaster Avenue

Revitalization Project

  

15

Project Allocation

3,000,000

16

17

18

19

20

(UU)  Acquisition, construction,

infrastructure and other related costs

for a supermarket project at 3rd and

Girard Streets in the Brewerytown

section

  

21

Project Allocation

7,000,000

22

23

24

(VV)  Acquisition, construction and other

related costs for a charter school at 14

Pattison Avenue

  

25

Project Allocation

10,000,000

26

27

28

29

30

(WW)  Construction, abatement of hazardous

materials, infrastructure, redevelopment

and other related costs for the Self

Help Movement restoration and

beautification project

  

- 174 -

 


1

Project Allocation

1,750,000

2

3

4

(XX)  Construction, redevelopment and other

related costs for the Philadelphia Zoo

intermodal project

  

5

Project Allocation

19,500,000

6

7

8

9

(YY)  Construction of a Comprehensive

Applied Research/Educational Facility at

Drexel University, including related

costs

  

10

Project Allocation

10,000,000

11

12

(ZZ)  Construction, infrastructure and other

related costs to revitalize FDR Park

  

13

Project Allocation

10,000,000

14

15

16

17

18

(AAA)  Construction, infrastructure,

redevelopment and other related costs

for the United Way of Southeastern PA

Parkway Building Capital Improvement

Project

  

19

Project Allocation

2,000,000

20

21

22

(BBB)  Acquisition, construction and other

related costs for a senior housing

project at 1201 Jackson Street

  

23

Project Allocation

10,000,000

24

25

26

27

(CCC)  Acquisition, construction,

infrastructure, redevelopment and other

related costs for improvements to five

city ice rinks

  

28

Project Allocation

1,000,000

29

30

(DDD)  Acquisition, construction,

infrastructure, redevelopment and other

  

- 175 -

 


1

2

3

related costs for a supermarket project

on Germantown Avenue in the Nicetown

section

4

Project Allocation

5,500,000

5

6

7

(EEE)  Construction, infrastructure and

other related costs to renovate the

Simons Community Recreation Center

  

8

Project Allocation

2,000,000

9

10

11

12

(FFF)  Construction, redevelopment and other

related costs for the ECA's John S. and

James L. Knight Green Jobs Training

Center

  

13

Project Allocation

853,000

14

15

16

17

(GGG)  Acquisition, construction,

infrastructure, redevelopment and other

related costs for the William Way Senior

Housing Project

  

18

Project Allocation

3,000,000

19

20

21

(HHH)  Construction and other related costs

for the Germantown Avenue Redevelopment

Project

  

22

Project Allocation

5,000,000

23

24

(III)  Capital improvements to Gifford

Playground and Park

  

25

Project Allocation

500,000

26

(52)  Pike County

  

27

(i)  County Projects

  

28

29

30

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

  

- 176 -

 


1

the county

2

Project Allocation

2,000,000

3

(ii)  Palmyra Township

  

4

5

6

7

8

(A)  Acquisition, infrastructure,

construction and other related costs for

a new career and technical center to

serve the students and work force of

Wayne and Pike Counties

  

9

Project Allocation

25,000,000

10

(53)  Potter County

  

11

(i)  County Projects

  

12

13

14

15

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

16

Project Allocation

2,000,000

17

(54)  Schuylkill County

  

18

(i)  County Projects

  

19

20

21

22

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

23

Project Allocation

2,000,000

24

25

26

27

(B)  Acquisition, construction,

infrastructure, redevelopment and other

related costs for a community

revitalization project

  

28

Project Allocation

5,000,000

29

30

(C)  Construction, infrastructure and other

related costs for the Brandonville

  

- 177 -

 


1

Pumping Station rehabilitation project

2

Project Allocation

1,000,000

3

(ii)  Cass Township

  

4

5

6

7

(A)  Construction, infrastructure,

redevelopment and other related costs

for distribution facility renovations at

Highridge Business Park

  

8

Project Allocation

5,000,000

9

(iii)  West Mahanoy Township

  

10

11

12

13

(A)  Construction, infrastructure,

redevelopment and other related costs

for the Frackville Industrial Park

improvement project

  

14

Project Allocation

1,000,000

15

(55)  Snyder County

  

16

(i)  County Projects

  

17

18

19

20

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

21

Project Allocation

2,000,000

22

(ii)  Monroe Township

  

23

24

25

26

27

28

29

(A)  Construction of new, modern, energy-

efficient hangar, renovation of existing

hangars, construction of new waste oil

heating system and construction of

additional t-hangars at Penn Valley

Airport, including acquisition and other

related costs

  

30

Project Allocation

1,345,000

- 178 -

 


1

(iii)  Selinsgrove Borough

  

2

3

4

5

(A)  Renovation and construction of

administrative and/or academic

facilities at Susquehanna University,

including related costs

  

6

Project Allocation

3,000,000

7

8

(B)  Susquehanna University renewable/clean

energy project, including related costs

  

9

Project Allocation

5,000,000

10

(56)  Somerset County

  

11

(i)  County Projects

  

12

13

14

15

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

16

Project Allocation

2,000,000

17

(ii)  Conemaugh Township

  

18

19

20

(A)  Construction, infrastructure,

redevelopment and other related costs

for the Greenhouse Park project

  

21

Project Allocation

500,000

22

23

24

(B)  Construction, infrastructure,

redevelopment and other related costs

for Whitewater Park project

  

25

Project Allocation

500,000

26

(iii)  Windber Borough

  

27

28

29

30

(A)  Construction, infrastructure,

redevelopment and other related costs

for the Windber Borough Recreational

Park

  

- 179 -

 


1

Project Allocation

1,000,000

2

(57)  Sullivan County

  

3

(i)  County Projects

  

4

5

6

7

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

8

Project Allocation

2,000,000

9

(58)  Susquehanna County

  

10

(i)  County Projects

  

11

12

13

14

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

15

Project Allocation

2,000,000

16

(59)  Tioga County

  

17

(i)  County Projects

  

18

19

20

21

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

22

Project Allocation

2,000,000

23

(ii)  Richmond Township

  

24

25

26

27

(A)  Development of the Tioga County I-99

Business Park, Phase 2, including

acquisition, construction and other

related costs

  

28

Project Allocation

3,500,000

29

(60)  Union County

  

30

(i)  County Projects

  

- 180 -

 


1

2

3

4

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

5

Project Allocation

2,000,000

6

(61)  Venango County

  

7

(i)  County Projects

  

8

9

10

11

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county 

  

12

Project Allocation

2,000,000

13

(62)  Warren County

  

14

(i)  County Projects

  

15

16

17

18

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

19

Project Allocation

2,000,000

20

(ii)  City of Warren

  

21

22

23

24

25

(A)  Construction, infrastructure,

streetscape improvements and other

related costs for the Warren downtown

economic development project, Phase I,

Part B

  

26

Project Allocation

1,000,000

27

(iii)  Youngsville Borough

  

28

29

30

(A)  Infrastructure, streetscape

enhancements and other related costs for

the Youngsville revitalization and

  

- 181 -

 


1

ecomonic redevelopment project, Phase I

2

Project Allocation

1,000,000

3

(63)  Washington County

  

4

(i)  County Projects

  

5

6

7

8

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

9

Project Allocation

2,000,000

10

(ii)  Canonsburg Borough

  

11

12

13

14

(A)  Acquisition, construction,

infrastructure and other related costs

for Education Management Corporation

expansion

  

15

Project Allocation

5,000,000

16

(iii)  Chartiers Township

  

17

18

(A)  Construction and other related costs

for a township community center

  

19

Project Allocation

1,200,000

20

(iv)  North Strabane Township

  

21

22

(A)  Redevelopment of the ARC Community

Center, including related costs

  

23

Project Allocation

1,000,000

24

(64)  Wayne County

  

25

(i)  County Projects

  

26

27

28

29

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

30

Project Allocation

2,000,000

- 182 -

 


1

(65)  Westmoreland County

  

2

(i)  County Projects

  

3

4

5

(A)  Construction, infrastructure,

rehabilitation and other related costs

at the Sony plant site

  

6

Project Allocation

15,000,000

7

8

9

(B)  Acquisition, infrastructure,

construction and other related costs at

the former Sony plant site

  

  

10

Project Allocation

30,000,000

11

12

13

14

(C)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

15

Project Allocation

5,000,000

16

(ii)  City of Jeannette

  

17

18

19

20

(A)  Construction, infrastructure,

redevelopment and other related costs

for the Elliott Company expansion

project

  

21

Project Allocation

8,000,000

22

(iii)  Salem Township

  

23

24

25

26

27

(A)  Construction and other related costs

for a new training facility for a joint

apprenticeship and training program for

the Western Pennsylvania Operating

Engineers

  

28

Project Allocation

6,500,000

29

(66)  Wyoming County

  

30

(i)  County Projects

  

- 183 -

 


1

2

3

4

(A)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

5

Project Allocation

2,000,000

6

(67)  York County

  

7

(i)  County Projects

  

8

9

10

(A)  Construction, infrastructure and other

related costs for the expansion of an

existing manufacturing plant

  

11

Project Allocation

5,000,000

12

13

14

(B)  Infrastructure and other related costs

for the construction of a new facility

to serve an existing manufacturer

  

15

Project Allocation

5,000,000

16

17

18

(C)  Construction, infrastructure and other

related costs for Harley-Davidson USA

York Facility

  

19

Project Allocation

25,000,000

20

21

22

(D)  Acquisition, infrastructure,

construction and other related costs for

a facility for Unilife Medical Solutions

  

23

Project Allocation

5,000,000

24

25

26

27

(E)  Acquisition, construction,

infrastructure and other related costs

for an economic development project in

the county

  

28

Project Allocation

5,000,000

29

30

(F)  Construction of capital improvements to

improve security in the vicinity of the

  

- 184 -

 


1

Lake Marburg damworks

2

Project Allocation

500,000

3

(ii)  City of York

  

4

5

(A)  Establishment of a medical equipment

facility

  

6

Project Allocation

10,000,000

7

(iii)  Fairview and Newberry Townships

  

8

9

10

(A)  Construction, acquisition and other

related costs for a multimunicipality

recreation and senior citizen facility

  

11

Project Allocation

5,000,000

12

(iii)  Spring Garden Township

  

13

14

15

16

(A)  Construction, redevelopment and other

related costs for York College Business

Center and Nursing Simulation/Laboratory

Wing

  

17

Project Allocation

7,000,000

18

(iv)  Spring Grove Borough

  

19

20

21

22

(A)  Construction, infrastructure and other

related costs for a bridge to

accommodate vehicles into the Glatfelter

Industrial Park

  

23

Project Allocation

500,000

24

(68)  Multiple Counties

  

25

(i)  Lehigh and Northampton Counties

  

26

27

28

29

30

(A)  Land acquisition, construction,

redevelopment and renovations necessary

for The Medical School of Temple

University and St. Luke's Hospital and

Health Network

  

- 185 -

 


1

Project Allocation

10,000,000

2

Section 7.  Itemization of flood control projects.

3

Additional capital projects in the category of flood control

4

projects to be constructed by the Department of Environmental

5

Protection, its successors or assigns, and to be financed by the

6

incurring of debt are hereby itemized, together with their

7

respective estimated costs, as follows:

8

9

  

Project

Total Project Allocation

10

(1)  Department of Environmental Protection

  

11

(i)  Erie County

  

12

13

14

15

(A)  Acquisition, construction,

infrastructure and other related costs

for Heidler Road flood relief project in

Millcreek Township

  

16

Project Allocation

1,700,000

17

(ii)  Luzerne County

  

18

19

20

(A)  Construction and other related costs

for Mill Creek flood protection project

in Plains Township

  

21

Project Allocation

2,000,000

22

(iii)  Montgomery County

  

23

24

25

26

(A)  Provide flood protection along Tacony

Creek in Glenside area and replace SEPTA

bridge with wider version in Townships

of Cheltenham and Abington

  

27

Project Allocation

3,600,000

28

(Base Project Allocation - $3,000,000)

  

29

(Design and Contingencies - $600,000)

  

30

(iv)  Schuylkill County

  

- 186 -

 


1

2

3

4

(A)  Construction of a detention basin and

other related costs for Schuylkill Haven

flood control project in Schuylkill

Haven Borough

  

5

Project Allocation

2,000,000

6

Section 8.  Itemization of Keystone Recreation, Park and

7

Conservation Fund projects.

8

Projects in the category of public improvement projects to be

9

constructed by the Department of Conservation and Natural

10

Resources, its successors or assigns, and to be financed by

11

current revenues of the Keystone Recreation, Park and

12

Conservation Fund are hereby itemized, together with their

13

respective estimated costs, as follows:

14

15

  

Project

Total Project Allocation

16

17

(1)  Department of Conservation and Natural

Resources

  

18

(i)  Beltzville State Park

  

19

20

(A)  Repair sewer line infiltration and

rehabilitate sewage treatment plant

  

21

Project Allocation

650,000

22

(ii)  Buchanan State Forest

  

23

24

(A)  Construct Buchanan Resource Management

Center

  

25

Project Allocation

3,500,000

26

(iii)  Caledonia State Park

  

27

28

(A)  Rehabilitate campgrounds within the

park

  

29

Project Allocation

1,300,000

30

(iv)  Codorus State Park

  

- 187 -

 


1

(A)  Construct new marina pier

  

2

Project Allocation

300,000

3

(v)  Cook Forest State Park

  

4

(A)  Replace park office and visitors center

  

5

Project Allocation

3,000,000

6

(vi)  Erie Bluffs State Park

  

7

(A)  Refurbish CXT latrine and parking area

  

8

Project Allocation

500,000

9

(vii)  Forbes State Forest

  

10

11

(A)  Rehabilitate Linn Run Road within the

park

  

12

Project Allocation

2,700,000

13

(viii)  French Creek State Park

  

14

(A)  Replace sewage lift stations

  

15

Project Allocation

300,000

16

(ix)  Gouldsboro State Park

  

17

(A)  Construct dam, phase 2, within the park

  

18

Project Allocation

400,000

19

(x)  Keystone State Park

  

20

21

(A)  Rehabilitate maintenance area within

the park

  

22

Project Allocation

300,000

23

(xi)  Lackawanna State Forest

  

24

(A)  Remove Rush Brook Dam

  

25

Project Allocation

200,000

26

(xii)  Lackawanna State Park

  

27

28

29

30

(A)  Rehabilitate pool complex and day use

area, including renovation of bathhouses

and adding space for lifeguard and first

aid station

  

- 188 -

 


1

Project Allocation

3,000,000

2

(xiii)  Laurel Hill State Park

  

3

4

(A)  Rehabilitate water line to group camp

number 1

  

5

Project Allocation

300,000

6

(xiv)  Linn Run State Park

  

7

(A)  Rehabilitate Laurel Summit area

  

8

Project Allocation

200,000

9

(xv)  Little Pine State Park

  

10

(A)  Rehabilitate shooting range

  

11

Project Allocation

300,000

12

(xvi)  Loyalsock State Forest

  

13

14

(A)  Rehabilitate Hillsgrove Ranger Station

and equipment storage shed

  

15

Project Allocation

325,000

16

(xvii)  Moraine State Park

  

17

18

(A)  Rehabilitate old 422 launch within the

park

  

19

Project Allocation

250,000

20

21

(B)  Rehabilitate sewage and collection

conveyance system

  

22

Project Allocation

300,000

23

24

(C)  Rehabilitate sewage treatment plant to

current standards and technology

  

25

Project Allocation

3,500,000

26

(xviii)  Nescopeck State Park

  

27

28

(A)  Construct culvert to replace current

dam spillway

  

29

Project Allocation

650,000

30

(xix)  Nockamixon State Park

  

- 189 -

 


1

2

3

(A)  Modify sewage treatment plant,

including reactor configuration and

contact tank modifications

  

4

Project Allocation

300,000

5

(xx)  Ohiopyle State Park

  

6

7

(A)  Replace Bridges 0914 CSX 2342 and 0936

CSX 2445

  

  

8

Project Allocation

550,000

9

(B)  Rehabilitate Ferncliff RRM and parking

  

10

Project Allocation

1,100,000

11

12

(C)  Replace superstructure bridge 0901,

Bruner Run Bridge

  

13

Project Allocation

400,000

14

(xxi)  Pine Grove Furnace State Park

  

15

(A)  Renovate swimming area at Fuller Lake

  

16

Project Allocation

300,000

17

(xxii)  Presque Isle State Park

  

18

(A)  Rehabilitate break wall

  

19

Project Allocation

400,000

20

21

(B)  Finish sand mound replacement at

Beaches 10 and 11 and the Stull Center

  

22

Project Allocation

300,000

23

(xxiii)  Prince Gallitzin State Park

  

24

(A)  Rehabilitate Beaver Valley Marina

  

25

Project Allocation

3,000,000

26

(xxiv)  Promised Land State Park

  

27

28

(A)  Rehabilitate Pickers Point/Deerfield

Campgrounds

  

29

Project Allocation

3,000,000

30

(B)  Repair Lower Lake Dam/Bridge 802

  

- 190 -

 


1

Project Allocation

3,700,000

2

(xxv)  Pymatuning State Park

  

3

(A)  Renovate Jamestown beach house

  

4

Project Allocation

250,000

5

(xxvi)  Reeds Gap State Park

  

6

7

(A)  Replace swimming pool with camping

cottage colony

  

8

Project Allocation

500,000

9

(xxvii)  Ricketts Glen State Park

  

10

11

(A)  Rehabilitate roads and parking lots

throughout the park

  

  

12

Project Allocation

1,300,000

13

(xxviii)  Salt Springs State Park

  

14

15

16

(A)  Replace existing vault toilet with new

comfort station, including

infrastructure

  

17

Project Allocation

300,000

18

(xxix)  Shawnee State Park

  

19

(A)  Pave areas near and around campgrounds

  

20

Project Allocation

250,000

21

(xxx)  Shikellamy State Park

  

22

(A)  Construct permanent causeway

  

23

Project Allocation

1,500,000

24

25

(B)  Replace Bags 6 and 7 and construct

permanent causeway

  

26

Project Allocation

3,000,000

27

(xxxi)  Sinnemahoning State Park

  

28

29

(A)  Refurbish restroom on the Wildlife

Viewing Trail

  

30

Project Allocation

600,000

- 191 -

 


1

(xxxii)  Sproul State Forest

  

2

3

(A)  Pave Young Woman's Creek Road within

the park

  

4

Project Allocation

350,000

5

6

(B)  Rehabilitate Baker's Run canoe access

and Baker's horse trail

  

7

Project Allocation

500,000

8

9

(C)  Rehabilitate Bloody Skillet-Beech

Creek/Two Rock ATV Bridge

  

10

Project Allocation

1,000,000

11

12

(D)  Construct horse trailer and

parking/camping at Baker's Run

  

13

Project Allocation

300,000

14

(xxxiii)  Tiadaghton State Forest

  

15

16

(A)  Rehabilitate Trout Run Road embankment

slide

  

17

Project Allocation

1,000,000

18

19

(B)  Rehabilitate Tomb Flats Boat Launch and

construct camping sites and restroom

  

20

Project Allocation

300,000

21

(xxxiv)  Tioga State Forest

  

22

23

24

25

(A)  Upgrade Pine Creek Trail, including

trail extension, parking lot and Route

287 at-grade crossing with paved

approaches and warning flashers

  

26

Project Allocation

300,000

27

(xxxv)  Tuscarora State Forest

  

28

29

(A)  Improve infrastructure services at

Bryner House

  

30

Project Allocation

1,500,000

- 192 -

 


1

(xxxvi)  Weiser State Forest

  

2

3

(A)  Improve SR 42 entrance, parking and

comfort station

  

4

Project Allocation

400,000

5

(xxxvii)  Yellow Creek State Park

  

6

(A)  Rehabilitate Camp Seph Mack, phase 1

  

7

Project Allocation

800,000

8

(xxxviii)  Various Forest Districts, Statewide

  

9

10

(A)  Inspect, repair and replace 47 fire

towers

  

11

Project Allocation

2,650,000

12

Section 9.  Itemization of Environmental Stewardship Fund

13

projects.

14

Projects in the category of public improvement projects to be

15

constructed by the Department of Conservation and Natural

16

Resources, its successors or assigns and to be financed by

17

current revenues of the Environmental Stewardship Fund are

18

hereby itemized together with their respective estimated

19

financial costs as follows:

20

21

  

Project

Total Project Allocation

22

23

(1)  Department of Conservation and Natural

Resources

  

  

24

(i)  Black Moshannon State Park

  

25

(A)  Rehabilitate dam spillway

  

26

Project Allocation

400,000

27

(B)  Rehabilitate three boat launches

  

28

Project Allocation

250,000

29

(ii)  Codorus State Park

  

30

(A)  Replace swimming pool and renovate

    

- 193 -

 


1

bathhouse interior

  

2

Project Allocation

2,500,000

3

(iii)  Delaware Canal State Park

  

4

(A)  Replace Ferry Street Bridge

  

5

Project Allocation

500,000

6

7

(B)  Rehabilitate Smithtown 5 and Upper

Limeport Bridges

  

8

Project Allocation

650,000

9

(C)  Replace bridges at Odette's

  

10

Project Allocation

650,000

11

(iv)  Delaware State Forest

  

12

13

(A)  Construct Delaware State Forest

Resource Management Center

  

  

14

Project Allocation

3,500,000

15

(v)  Elk State Forest

  

16

17

18

(A)  Construct Elk Scenic Drive pull-off

consisting of viewing platform, parking,

kiosk and restrooms

  

19

Project Allocation

300,000

20

(vi)  Evansburg State Park

  

21

(A)  Replace sewer lines within the park

  

22

Project Allocation

480,000

23

(vii)  Frances Slocum State Park

  

24

25

(A)  Rehabilitate sewage treatment plant and

infiltration

  

26

Project Allocation

1,500,000

27

(viii)  Hickory Run State Park

  

28

29

(A)  Replace pit latrines (OGT and CG) with

modern comfort stations

  

30

Project Allocation

2,200,000

- 194 -

 


1

(ix)  Ohiopyle State Park

  

2

3

(A)  Rehabilitate Bridge 0927, Jonathan Run

Culvert

  

4

Project Allocation

1,500,000

5

(x)  Ricketts Glen State Park

  

6

7

(A)  Rehabilitate sewage treatment plant and

water system

  

8

Project Allocation

550,000

9

(xi)  Shawnee State Park

  

10

(A)  Rehabilitate water treatment plant

  

11

Project Allocation

1,200,000

12

(xii)  Tiadaghton State Forest

  

13

14

(A)  Construct Black Forest Trail Suspension

Bridge

  

15

Project Allocation

370,000

16

(xiii)  Weiser State Forest

  

17

18

(A)  Construct Weiser Resource Management

Center

  

19

Project Allocation

3,500,000

20

Section 10.  Itemization of State forestry bridge projects.

21

Projects in the category of State forestry bridge projects to

22

be constructed by the Department of Conservation and Natural

23

Resources, its successors or assigns, and to be financed by oil

24

company franchise tax revenues pursuant to 75 Pa.C.S. § 9502(a)

25

(2)(iv) (relating to imposition of tax) are hereby itemized,

26

together with their respective estimated costs, as follows:

27

28

  

Project

Total Project Allocation

29

(1)  Cameron County

  

30

(i)  Elk State Forest

  

- 195 -

 


1

2

3

(A)  Replace entrance bridge to lodge over

Brooks Run, including guide rails and

approach work

  

4

Project Allocation

300,000

5

6

(B)  Replace Dents Run Road over Bear

Hollow, Weatherbord Run 13-9006

  

7

Project Allocation

500,000

8

(2)  Clearfield County

  

9

(i)  Moshannon State Forest

  

10

11

(A)  Replace Meyers Run Road over Black

Moshannon Creek

  

12

Project Allocation

450,000

13

(B)  Replace North Run Road over Smays Run

  

14

Project Allocation

300,000

15

16

(C)  Replace Little Medix Road over Little

Medix Run, Bridge 9-0012

  

17

Project Allocation

300,000

18

19

20

(D)  Replace Little Medix Road over Little

Medix Run, Culverts 9-0013, 9-0014 and

9-0016

  

21

Project Allocation

400,000

22

23

(E)  Replace Shirks Road over Black

Moshannon Creek Bridge 9-0028

  

24

Project Allocation

300,000

25

26

27

28

(F)  Replace structures for Bridge 9-9015

Meyers Run Road/Black Moshannon Creek

and Bridge 9-0028 Shirks Road/Black

Moshannon Creek

  

29

Project Allocation

900,000

30

(G)  Replace structures for Bridge 9-0012

  

- 196 -

 


1

2

3

Little Medix Road over Medix Run and

Bridges 9-0013, 9-0014 and 9-0016 Little

Medix Road over Little Medix Run

4

Project Allocation

1,400,000

5

6

7

(H)  Replace structures for North Run Road

over Smays Run and Smays Trail over

tributary of Smays Run

  

8

Project Allocation

400,000

9

10

(I)  Replace Reservoir Road over Upper Three

Run

  

11

Project Allocation

300,000

12

(3)  Clinton County

  

13

(i)  Sproul State Forest

  

14

15

(A)  Replace Mill Run Road Bridge over Mill

Run, Bridge 10-0046

  

16

Project Allocation

325,000

17

18

(B)  Replace Mill Run Road over Mill Run,

Bridge 10-0046

  

19

Project Allocation

300,000

20

21

(C)  Replace Birch Island Road over Amos

Branch, Bridge 10-0040

  

22

Project Allocation

300,000

23

(4)  Franklin County

  

24

(i)  Michaux State Forest

  

25

26

(A)  Replace Biesecker Gap Road Bridge over

Biesecker Run

  

27

Project Allocation

200,000

28

(5)  Huntingdon County

  

29

(1)  Rothrock State Forest

  

30

(A)  Replace Lingle Valley Road Bridge over

  

- 197 -

 


1

Laurel Creek

2

Project Allocation

300,000

3

4

5

(B)  Rehabilitate three bridges - Pine Swamp

Road over Laurel and Little Shingletown

Runs

  

6

Project Allocation

450,000

7

8

9

10

(C)  Replace superstructure and rehabilitate

abutments on Structure 5-0026,

Pennsylvania Furnace Road over Fowlers

Run

  

11

Project Allocation

300,000

12

13

14

(D)  Replace bridges - Diamond Valley Road

over Globe Run, Bridges 5-0023 and

5-0024

  

15

Project Allocation

400,000

16

(6)  Lycoming County

  

17

(i)  Tiadaghton State Forest

  

18

19

(A)  Replace Trout Run Bridge over First Big

Fork

  

20

Project Allocation

250,000

21

22

(B)  Replace Trout Run Bridge over Second

Big Fork

  

  

23

Project Allocation

250,000

24

25

(C)  Replace Trout Run Bridge over first

unnamed tributary, Bridge 9027

  

26

Project Allocation

250,000

27

28

(D)  Replace Trout Run Bridge over second

unnamed tributary, Bridge 9027

  

29

Project Allocation

250,000

30

(E)  Replace roadway for Trout Run

  

- 198 -

 


1

2

Road/First Big Fork 12-0043 and Second

Big Fork 12-0044 and improve roadway

3

Project Allocation

680,000

4

5

(F)  Replace Zinck Fork Road over tributary

of Browns Run and Upper Pine

  

6

Project Allocation

300,000

7

8

(G)  Replace Zinck Fork Road over Upper Pine

Bottom

  

9

Project Allocation

300,000

10

(7)  Perry County

  

11

(i)  Tuscarora State Forest

  

12

13

(A)  Replace Second Narrows Road Bridge over

Conocochegue Creek, Bridge 3-0001

  

14

Project Allocation

300,000

15

16

(B)  Replace bridge on Pine Ridge Road over

Spruce Run, Bridge 3-0004

  

17

Project Allocation

300,000

18

(8)  Potter County

  

19

(i)  Susquehannock State Forest

  

20

21

(A)  Replace old culvert on Long Toe Road

over Prouty Run

  

22

Project Allocation

300,000

23

(9)  Schuylkill County

  

24

(i)  Weiser State Forest

  

25

26

(A)  Replace Lykens Road/West Branch

Rattling Creek Bridge 18-0002

  

27

Project Allocation

300,000

28

Section 11.  Itemization of General Fund current revenue

29

projects.

30

The individual capital projects in the category of public

- 199 -

 


1

improvement projects to be constructed or acquired by the

2

Department of General Services, its successors or assigns, and

3

to be financed from General Fund current revenues, are hereby

4

itemized, together with their respective estimated financial

5

costs, as follows:

6

7

  

Project

Total Project Allocation

8

(1)  Department of Corrections

  

9

(i)  State Correctional Institution at Dallas

  

10

11

12

(A)  Lease and/or purchase an emergency

housing facility along with related

infrastructure improvements

  

13

Project Allocation

3,500,000

14

(Base Project Allocation - $3,500,000)

  

15

(ii)  State Correctional Institution at Forest

  

16

17

18

(A)  Lease and/or purchase an emergency

housing facility along with related

infrastructure improvements

  

19

Project Allocation

3,500,000

20

(Base Project Allocation - $3,500,000)

  

21

22

(iii)  State Correctional Institution at

Somerset

  

23

24

25

(A)  Lease and/or purchase an emergency

housing facility along with related

infrastructure improvements

  

26

Project Allocation

3,500,000

27

(Base Project Allocation - $3,500,000)

  

28

(2)  Pennsylvania Historical and Museum Commission

  

29

(i)  Landis Valley Museum

  

30

(A)  Replace HVAC system to collections

  

- 200 -

 


1

2

3

gallery with geothermal HVAC system and

associated equipment, duct modification

and new controls

4

Project Allocation

900,000

5

(Base Project Allocation - $720,000)

  

6

(Design and Contingencies - $180,000)

  

7

Section 12.  Itemization of State ATV/Snowmobile Fund current

8

revenue projects.

9

Projects in the category of State ATV/Snowmobile Fund

10

projects to be constructed by the Department of Conservation and

11

Natural Resources, its successors or assigns, and to be financed

12

from State ATV/Snowmobile Fund current revenue, are hereby

13

itemized, together with their respective estimated costs as

14

follows:

15

16

  

Project

Total Project Allocation

17

(1)  Lackawanna County

  

18

(i)  Lackawanna State Forest

  

19

(A)  Construct Carvolth Snowmobile Trail

  

20

Project Allocation

300,000

21

(2)  Venango County

  

22

(i)  Oil Creek State Park

  

23

24

(A)  Construct Missing Link bike trail in

the southern portion

  

25

Project Allocation

300,000

26

Section 13.  Itemization of State Transportation Enhancement

27

Funds current revenue projects.

28

Projects in the category of State Transportation Enhancement

29

Funds projects to be constructed by the Department of

30

Conservation and Natural Resources, its successors or assigns,

- 201 -

 


1

and to be financed from State Transportation Enhancement Funds

2

current revenue, are hereby itemized together with their

3

respective costs as follows:

4

5

  

Project

Total Project Allocation

6

(1)  Bucks County

  

7

(i)  Delaware Canal State Park

  

8

9

(A)  Construct Conrail embankment tunnel for

the canal towpath

  

10

Project Allocation

1,000,000

11

12

(B)  Construct a Route 13 bridge for the

canal towpath

  

13

Project Allocation

1,600,000

14

15

(C)  Replace Yardley aqueduct to meet

current standards

  

16

Project Allocation

2,400,000

17

Section 14.  Debt authorization.

18

(a)  Public improvements.--The Governor, Auditor General and

19

State Treasurer are hereby authorized and directed to borrow

20

from time to time in addition to any authorization heretofore or

21

hereafter enacted, on the credit of the Commonwealth, subject to

22

the limitations provided in the current capital budget, money

23

not exceeding in the aggregate the sum of $1,134,191,000 as may

24

be found necessary to carry out the acquisition and construction

25

of the public improvement projects specifically itemized in a

26

capital budget.

27

(b)  Furniture and equipment.--The Governor, Auditor General

28

and State Treasurer are hereby authorized and directed to borrow

29

from time to time in addition to any authorization heretofore or

30

hereafter enacted, on the credit of the Commonwealth, subject to

- 202 -

 


1

the limitations provided in the current capital budget, money

2

not exceeding in the aggregate the sum of $30,471,000 as may be

3

found necessary to carry out the acquisition and construction of

4

the public improvement projects consisting of the acquisition of

5

original movable furniture and equipment specifically itemized

6

in a capital budget.

7

(c)  Transportation assistance.--The Governor, Auditor

8

General and State Treasurer are hereby authorized and directed

9

to borrow from time to time in addition to any authorization

10

heretofore or hereafter enacted, on the credit of the

11

Commonwealth, subject to the limitations provided in the current

12

capital budget, money not exceeding in the aggregate the sum of

13

$506,042,000 as may be found necessary to carry out the

14

acquisition and construction of the transportation assistance

15

projects specifically itemized in a capital budget.

16

(d)  Redevelopment assistance.--Subject to the limitation in

17

section 317(b) of the act of February 9, 1999 (P.L.1, No.1),

18

known as the Capital Facilities Debt Enabling Act, the Governor,

19

Auditor General and State Treasurer are hereby authorized and

20

directed to borrow from time to time in addition to any

21

authorization heretofore or hereafter enacted, on the credit of

22

the Commonwealth, subject to the limitations provided in the

23

current capital budget, money not exceeding in the aggregate the

24

sum of $2,724,739,000 as may be found necessary to carry out the

25

redevelopment assistance capital projects specifically itemized

26

in a capital budget.

27

(e)  Flood control.--The Governor, Auditor General and State

28

Treasurer are hereby authorized and directed to borrow from time

29

to time in addition to any authorization heretofore or hereafter

30

enacted, on the credit of the Commonwealth, subject to the

- 203 -

 


1

limitations provided in the current capital budget, money not

2

exceeding in the aggregate the sum of $9,300,000 as may be found

3

necessary to carry out the acquisition and construction of the

4

flood control projects specifically itemized in a capital

5

budget.

6

Section 15.  Issue of bonds.

7

The indebtedness authorized in this act shall be incurred

8

from time to time and shall be evidenced by one or more series

9

of general obligation bonds of the Commonwealth in such

10

aggregate principal amount for each series as the Governor, the

11

Auditor General and the State Treasurer shall determine, but the

12

latest stated maturity date shall not exceed the estimated

13

useful life of the projects being financed as stated in section

14

16.

15

Section 16.  Estimated useful life and term of debt.

16

(a)  Estimated useful life.--The General Assembly states that

17

the estimated useful life of the public improvement projects

18

itemized in this act is as follows:

19

(1)  Public improvement projects, 30 years.

20

(2)  Furniture and equipment projects, 10 years.

21

(3)  Transportation assistance projects:

22

(i)  Rolling stock, 15 years.

23

(ii)  Passenger buses, 12 years.

24

(iii)  Furniture and equipment, 10 years.

25

(iv)  All others, 30 years.

26

(b)  Term of debt.--The maximum term of the debt authorized

27

to be incurred under this act is 30 years.

28

Section 17.  Appropriations.

29

(a)  Public improvements.--The net proceeds of the sale of

30

the obligations authorized in this act are hereby appropriated

- 204 -

 


1

from the Capital Facilities Fund to the Department of General

2

Services in the maximum amount of $1,134,191,000 to be used by

3

it exclusively to defray the financial cost of the public

4

improvement projects specifically itemized in a capital budget.

5

After reserving or paying the expenses of the sale of the

6

obligation, the State Treasurer shall pay to the Department of

7

General Services the moneys as required and certified by it to

8

be legally due and payable.

9

(b)  Furniture and equipment.--The net proceeds of the sale

10

of the obligations authorized in this act are hereby

11

appropriated from the Capital Facilities Fund to the Department

12

of General Services in the maximum amount of $30,471,000 to be

13

used by it exclusively to defray the financial cost of the

14

public improvement projects consisting of the acquisition of

15

original movable furniture and equipment specifically itemized

16

in a capital budget. After reserving or paying the expenses of

17

the sale of the obligation, the State Treasurer shall pay to the

18

Department of General Services the moneys as required and

19

certified by it to be legally due and payable.

20

(c)  Transportation assistance.--The net proceeds of the sale

21

of the obligations authorized in this act are hereby

22

appropriated from the Capital Facilities Fund to the Department

23

of Transportation in the maximum amount of $506,042,000 to be

24

used by it exclusively to defray the financial cost of the

25

transportation assistance projects specifically itemized in a

26

capital budget. After reserving or paying the expenses of the

27

sale of the obligation, the State Treasurer shall pay to the

28

Department of Transportation the moneys as required and

29

certified by it to be legally due and payable.

30

(d)  Redevelopment assistance.--The net proceeds of the sale

- 205 -

 


1

of the obligations authorized in this act are hereby

2

appropriated from the Capital Facilities Fund to the Department

3

of Community and Economic Development in the maximum amount of

4

$2,724,739,000 to be used by it exclusively to defray the

5

financial cost of the redevelopment assistance capital projects

6

specifically itemized in a capital budget. After reserving or

7

paying the expenses of the sale of the obligation, the State

8

Treasurer shall pay to the Department of Community and Economic

9

Development the moneys as required and certified by it to be

10

legally due and payable.

11

(e)  Flood control.--The net proceeds of the sale of the

12

obligations authorized in this act are hereby appropriated from

13

the Capital Facilities Fund to the Department of Environmental

14

Protection in the maximum amount of $9,300,000 to be used by it

15

exclusively to defray the financial cost of the flood control

16

projects specifically itemized in a capital budget. After

17

reserving or paying the expenses of the sale of the obligation,

18

the State Treasurer shall pay to the Department of Environmental

19

Protection the moneys as required and certified by it to be

20

legally due and payable.

21

Section 18.  Federal funds.

22

(a)  Projects itemized in this act.--In addition to those

23

funds appropriated in section 17, all moneys received from the

24

Federal Government for the projects specifically itemized in

25

this act are also hereby appropriated for those projects.

26

(b)  Projects not requiring itemization.--Department of

27

Military and Veterans Affairs construction projects which are

28

totally federally funded but which are to be administered by the

29

Department of General Services are hereby authorized.

30

Section 19.  Delegation.

- 206 -

 


1

Notwithstanding any provision of law to the contrary, the

2

Department of General Services may delegate the design and

3

construction of the project contained in section 3(5)(iii)(A) of

4

the act of July 4, 2008 (P.L.329, No.41), known as the Capital

5

Budget Project Itemization Act of 2007-2008, to the University

6

of Pennsylvania.

7

Section 20.  Editorial changes.

8

In editing and preparing this act for printing following the

9

final enactment, the Legislative Reference Bureau shall insert

10

or revise letters or numbers for projects where the letters or

11

numbers are missing or require revision. The bureau shall also

12

revise the total monetary amounts for the total authorization,

13

debt authorization, appropriations and departmental totals as

14

necessary to agree with the total monetary amounts of the

15

projects.

16

Section 21.  Effective date.

17

This act shall take effect immediately.

- 207 -