PRIOR PRINTER'S NOS. 1907, 2148, 2185         PRINTER'S NO. 2221

THE GENERAL ASSEMBLY OF PENNSYLVANIA


SENATE BILL

No. 1496 Session of 1996


        INTRODUCED BY TILGHMAN, APRIL 9, 1996

        SENATE AMENDMENTS TO HOUSE AMENDMENTS, JUNE 28, 1996

                                     AN ACT

     1  Providing for the capital budget for the fiscal year 1996-1997;   <--
     2     ITEMIZING PUBLIC IMPROVEMENT PROJECTS AND FURNITURE AND
     3     EQUIPMENT PROJECTS AND REDEVELOPMENT ASSISTANCE PROJECTS TO
     4     BE CONSTRUCTED, ACQUIRED OR ASSISTED BY THE DEPARTMENT OF
     5     GENERAL SERVICES, TOGETHER WITH THEIR ESTIMATED FINANCIAL
     6     COSTS; INCURRING OF DEBT WITHOUT THE APPROVAL OF THE ELECTORS
     7     FOR THE PURPOSE OF FINANCING THE PROJECTS TO BE CONSTRUCTED,
     8     ACQUIRED OR ASSISTED BY THE DEPARTMENT OF GENERAL SERVICES;
     9     STATING THE USEFUL LIFE OF THE PROJECTS; AUTHORIZING CERTAIN
    10     CONTRACT PROVISIONS; MAKING APPROPRIATIONS; AND MAKING
    11     REPEALS.

    12     The General Assembly of the Commonwealth of Pennsylvania
    13  hereby enacts as follows:
    14  Section 1.  Short title and construction.
    15     (a)  Short title.--This act shall be known and may be cited
    16  as the Capital Budget Act of 1996-1997.
    17     (b)  Supplements.--A reference to this act shall be deemed to
    18  include a reference to the supplements to this act.
    19     (c)  Fiscal Code.--The provisions and definitions of Article
    20  XVI-B of the act of April 9, 1929 (P.L.343, No.176), known as
    21  The Fiscal Code, shall apply to this act to the extent they are
    22  not inconsistent with this act.

     1  Section 2.  Overall limitations on debt to be incurred for
     2                 capital projects.
     3     The maximum principal amount of additional debt to be
     4  incurred during the 1996-1997 fiscal year, and thereafter until
     5  the enactment of the 1997-1998 capital budget specifying the
     6  maximum debt for the 1997-1998 fiscal year, for capital projects
     7  specifically itemized in a capital budget pursuant to section
     8  7(a)(4) of Article VIII of the Constitution of Pennsylvania, and
     9  the fund to be charged with the repayment of such debt, shall,
    10  with respect to each category of capital projects, be as
    11  follows:
    12                Category              Amount          Fund
    13  (1)  Public Improvement
    14     Projects:
    15     (i)  Buildings and                            General Fund or
    16         Structures               $170,000,000     Special Fund as
    17     (ii)  Furniture and                           applicable
    18         Equipment                  19,000,000
    19  (2)  Transportation
    20     Assistance Projects           140,000,000     General Fund
    21  (3)  Redevelopment
    22     Assistance Projects            90,000,000     General Fund
    23  (4)  Flood Control
    24     Projects                       13,000,000     General Fund
    25  (5)  Highway
    26     Projects                       85,000,000     Motor License
    27                                                        Fund
    28     Total                        $517,000,000
    29  Section 3.  Bond services.                                        <--
    30     (a)  General rule.--Any and all bond service required by this
    19960S1496B2221                  - 2 -

     1  act which cannot be performed by employees of this Commonwealth
     2  shall be contracted with and performed by the bond service
     3  provider submitting the lowest responsible bid. For each bond
     4  service required by this act, the issuing authority shall
     5  distribute a request for proposal requiring a written response.
     6  After each bond service provider is selected, the issuing
     7  authority shall issue a written report of the selection of the
     8  service provider and the basis therefor. A copy of the request
     9  for proposal and the responses thereto shall be made a part of
    10  the report. This report shall be made available to the public.
    11     (b)  Definitions.--As used in this section, the following
    12  words and phrases shall have the meanings given to them in this
    13  subsection:
    14     "Bond services."  Legal, financial and other services
    15  rendered in conjunction with any bonds issued pursuant to this
    16  act.
    17     "Bond service provider."  Any bond counsel, financial
    18  adviser, underwriter, loan and transfer agent, verification
    19  agent or printer who provides bond services pursuant to this
    20  act.
    21  SECTION 3.  TOTAL AUTHORIZATION.                                  <--
    22     (A)  PUBLIC IMPROVEMENTS.--THE TOTAL AUTHORIZATION FOR THE
    23  ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC
    24  IMPROVEMENT PROJECTS ITEMIZED IN SECTION 4 AND TO BE CONSTRUCTED
    25  OR ACQUIRED BY THE DEPARTMENT OF GENERAL SERVICES, ITS
    26  SUCCESSORS OR ASSIGNS, AND TO BE FINANCED BY THE INCURRING OF
    27  DEBT, SHALL BE $352,641,000.
    28     (B)  FURNITURE AND EQUIPMENT.--THE TOTAL AUTHORIZATION FOR
    29  THE ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC
    30  IMPROVEMENT PROJECTS CONSISTING OF THE ACQUISITION OF ORIGINAL
    19960S1496B2221                  - 3 -

     1  MOVABLE FURNITURE AND EQUIPMENT TO COMPLETE PUBLIC IMPROVEMENT
     2  PROJECTS ITEMIZED IN SECTION 5 AND TO BE ACQUIRED BY THE
     3  DEPARTMENT OF GENERAL SERVICES, ITS SUCCESSORS OR ASSIGNS, AND
     4  TO BE FINANCED BY THE INCURRING OF DEBT SHALL BE $919,000.
     5     (C)  REDEVELOPMENT ASSISTANCE.--THE TOTAL AUTHORIZATION FOR
     6  THE ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF REDEVELOPMENT
     7  ASSISTANCE AND REDEVELOPMENT ASSISTANCE CAPITAL PROJECTS
     8  ITEMIZED IN SECTION 6 FOR CAPITAL GRANTS BY THE DEPARTMENT OF
     9  COMMUNITY AFFAIRS, ITS SUCCESSORS OR ASSIGNS, AND TO BE FINANCED
    10  BY THE INCURRING OF DEBT, SHALL BE $10,000,000.
    11  SECTION 4.  ITEMIZATION OF PUBLIC IMPROVEMENT PROJECTS.
    12     THE ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC
    13  IMPROVEMENT PROJECTS TO BE CONSTRUCTED OR ACQUIRED BY THE
    14  DEPARTMENT OF GENERAL SERVICES, IT SUCCESSORS OR ASSIGNS, AND TO
    15  BE FINANCED BY THE INCURRING OF DEBT, ARE HEREBY ITEMIZED,
    16  TOGETHER WITH ESTIMATED FINANCIAL COSTS, AS FOLLOWS:
    17                                                           TOTAL
    18                                                          PROJECT
    19             PROJECT                                    ALLOCATION
    20  (1)  DEPARTMENT OF CONSERVATION AND NATURAL
    21     RESOURCES                                            $125,000
    22     (I)  TYLER STATE PARK
    23         (A)  REPAIR AND RECONSTRUCTION OF SCHOFIELD
    24             FORD COVERED BRIDGE                           125,000
    25  (2)  DEPARTMENT OF CORRECTIONS                      $123,091,000
    26     (I)  STATE CORRECTIONAL INSTITUTION -
    27         FRACKVILLE, SCHUYLKILL COUNTY
    28         (A)  CONSTRUCTION OF UP TO 24 ADDITIONAL
    29             HIGH SECURITY CELLS FOR THE RESTRICTED
    30             HOUSING FACILITY                            1,570,000
    19960S1496B2221                  - 4 -

     1             (BASE PROJECT ALLOCATION - $1,308,000)
     2             (DESIGN AND CONTINGENCIES - $262,000)
     3     (II)  STATE CORRECTIONAL INSTITUTION - MUNCY,
     4         LYCOMING COUNTY
     5         (A)  CONSTRUCTION OF UP TO 96 ADDITIONAL
     6             HIGH SECURITY CELLS FOR THE RESTRICTED
     7             HOUSING FACILITY                            4,990,000
     8             (BASE PROJECT ALLOCATION - $4,158,000)
     9             (DESIGN AND CONTINGENCIES - $832,000)
    10     (III)  SOMERSET STATE HOSPITAL - SOMERSET
    11         COUNTY
    12         (A)  CONVERSION OF A HOSPITAL TO A STATE
    13             CORRECTIONAL INSTITUTION, INCLUDING THE
    14             RENOVATION OF EXISTING ADMINISTRATION,
    15             HOUSING, DIETARY AND LAUNDRY
    16             FACILITIES, ALONG WITH THE ELECTRICAL,
    17             HEATING AND CENTRAL ENERGY
    18             INFRASTRUCTURE, AND NEW CONSTRUCTION
    19             INCLUDING A WAREHOUSE, RESTRICTED
    20             HOUSING AND RECREATIONAL BUILDINGS
    21             ALONG WITH PERIMETER FENCING AND
    22             ELECTRONIC DETECTION SYSTEM                25,279,000
    23             (BASE PROJECT ALLOCATION - $21,066,000)
    24             (DESIGN AND CONTINGENCIES - $4,213,000)
    25     (IV)  STATE CORRECTIONAL INSTITUTION - FOREST
    26         COUNTY
    27         (A)  CONSTRUCTION OF A PROTOTYPICAL 1,000-
    28             CELL MEDIUM SECURITY CORRECTIONAL
    29             FACILITY                                   91,252,000
    30             (BASE PROJECT ALLOCATION - $78,480,000)
    19960S1496B2221                  - 5 -

     1             (LAND ALLOCATION - $1,000,000)
     2             (DESIGN AND CONTINGENCIES -
     3             $11,772,000)
     4  (3)  DEPARTMENT OF ENVIRONMENTAL RESOURCES              $500,000
     5     (I)  RIDLEY PARK BOROUGH
     6         (A)  REPLACEMENT OF EAST LAKE DAM                 500,000
     7  (4)  DEPARTMENT OF GENERAL SERVICES                 $227,145,000
     8     (I)  CAPITOL COMPLEX
     9         (A)  DEMOLITION OF THE TRANSPORTATION AND
    10             SAFETY BUILDING AND PLAZA AREA AND
    11             CONSTRUCTION OF A NEW OFFICE COMPLEX
    12             WITH UNDERGROUND PARKING                  218,400,000
    13             (BASE PROJECT ALLOCATION -
    14             $168,000,000)
    15             (DESIGN AND CONTINGENCIES -
    16             $50,400,000)
    17         (B)  ADDITIONAL FUNDS FOR DGS 946-2,
    18             RENOVATION AND CONVERSION OF OLD MUSEUM
    19             BUILDING FOR LEGISLATIVE OFFICES,
    20             INCLUDING RESTORATION OF ALL MASONRY,
    21             WINDOWS AND DOORS AND A PARTIAL ROOF
    22             RECONSTRUCTION PLUS COMPLETE INTERIOR
    23             RESTORATION AND RENOVATION                  8,745,000
    24             (BASE PROJECT ALLOCATION - $7,506,000)
    25             (DESIGN AND CONTINGENCIES - $1,239,000)
    26  (5)  HISTORICAL AND MUSEUM COMMISSION                 $1,000,000
    27     (I)  OLD BEDFORD VILLAGE, BEDFORD COUNTY
    28         (A)  REHABILITATION                             1,000,000
    29             (BASE PROJECT ALLOCATION - $1,000,000)
    30  (6)  PENNSYLVANIA STATE POLICE                          $780,000
    19960S1496B2221                  - 6 -

     1     (I)  DEOXYRIBONUCLEIC ACID (DNA) LABORATORY,
     2         WESTMORELAND COUNTY
     3         (A)  CONSTRUCTION OF A MODULAR BUILDING FOR
     4             COLLECTING, ANALYZING AND STORING DNA
     5             SAMPLES IN RESPONSE TO THE DNA
     6             DETECTION OF SEXUAL AND VIOLENT
     7             OFFENDERS ACT OF 1995                         780,000
     8             (BASE PROJECT ALLOCATION - $650,000)
     9             (DESIGN AND CONTINGENCIES - $130,000)
    10  SECTION 5.  ITEMIZATION OF FURNITURE AND EQUIPMENT PROJECTS.
    11     ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC
    12  IMPROVEMENT PROJECTS CONSISTING OF THE ACQUISITION OF MOVABLE
    13  FURNITURE AND EQUIPMENT TO COMPLETE PUBLIC IMPROVEMENT PROJECTS
    14  AND TO BE PURCHASED BY THE DEPARTMENT OF GENERAL SERVICES, ITS
    15  SUCCESSORS OR ASSIGNS, AND TO BE FINANCED BY THE INCURRING OF
    16  DEBT ARE HEREBY ITEMIZED, TOGETHER WITH THEIR RESPECTIVE
    17  ESTIMATED FINANCIAL COSTS, AS FOLLOWS:                   TOTAL
    18                                                          PROJECT
    19             PROJECT                                    ALLOCATION
    20  (1)  DEPARTMENT OF PUBLIC WELFARE                       $821,000
    21     (I)  YOUTH DETECTION FACILITY AT TROUGH CREEK
    22         (A)  ORIGINAL FURNITURE AND EQUIPMENT FOR
    23             THE NEW EDUCATION BUILDING AT THE
    24             TROUGH CREEK MAXIMUM SECURITY YOUTH
    25             DETENTION FACILITY DGS 594-1                  224,000
    26     (II)  YOUTH DETENTION FACILITY AT DANVILLE
    27         (A)  ORIGINAL FURNITURE AND EQUIPMENT FOR
    28             MAXIMUM SECURITY YOUTH DETENTION
    29             FACILITY FOR CENTRAL PENNSYLVANIA DGS
    30             503-17                                        597,000
    19960S1496B2221                  - 7 -

     1  (2)  PENNSYLVANIA STATE POLICE                           $98,000
     2     (I)  DEOXYRIBONUCLEIC ACID (DNA) LABORATORY -
     3         WESTMORELAND COUNTY163
     4         (A)  ORIGINAL FURNITURE AND EQUIPMENT FOR
     5             THE NEW DNA LABORATORY                         98,000
     6  SECTION 6.  ITEMIZATION OF REDEVELOPMENT ASSISTANCE PROJECTS.
     7     ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF REDEVELOPMENT
     8  ASSISTANCE PROJECTS FOR CAPITAL GRANTS BY THE DEPARTMENT OF
     9  COMMUNITY AFFAIRS, ITS SUCCESSORS OR ASSIGNS, AUTHORIZED UNDER
    10  THE PROVISIONS OF THE ACT OF MAY 20, 1949 (P.L.1633, NO.493),
    11  KNOWN AS THE HOUSING AND REDEVELOPMENT ASSISTANCE LAW, AND
    12  REDEVELOPMENT ASSISTANCE CAPITAL PROJECTS AND TO BE FINANCED BY
    13  THE INCURRING OF DEBT, ARE HEREBY ITEMIZED, TOGETHER WITH THEIR
    14  ESTIMATED FINANCIAL COSTS, AS FOLLOWS:
    15                                                           TOTAL
    16                                                          PROJECT
    17             PROJECT                                    ALLOCATION
    18  (1)  ALLEGHENY COUNTY
    19     (I)  SITE PREPARATION, ENVIRONMENTAL CLEANUP
    20         AND INFRASTRUCTURE DEVELOPMENT FOR THE
    21         EXPANSION OF THE PITTSBURGH TECHNOLOGY
    22         CENTER ACROSS FROM THE MONONGAHELA RIVER TO
    23         THE FORMER LTV SITE ON THE SOUTHSIDE            2,500,000
    24     (II)  DEVELOPMENT OF TECHNOLOGY BUSINESS
    25         INCUBATORS IN PROXIMITY TO RESEARCH
    26         INSTITUTIONS IN THE OAKLAND AREA OF
    27         PITTSBURGH                                      2,500,000
    28     (III)  REDEVELOPMENT OF THE SITE AND BUILDINGS
    29         AND ENVIRONMENTAL CLEANUP OF THE OLD
    30         AIRPORT TERMINAL AT THE GREATER PITTSBURGH
    19960S1496B2221                  - 8 -

     1         INTERNATIONAL AIRPORT                           1,000,000
     2     (IV)  REDEVELOPMENT OF THE PIPE MILL BUILDING
     3         ON THE SITE OF THE FORMER USX NATIONAL
     4         WORKS IN MCKEESPORT                             1,500,000
     5     (V)  COMPLETION OF THE DEVELOPMENT OF THE
     6         SENATOR JOHN HEINZ PITTSBURGH REGIONAL
     7         HISTORY CENTER                                  1,000,000
     8     (VI)  DISTANCE EDUCATION NETWORK, UNIVERSITY OF
     9         PITTSBURGH                                      1,500,000
    10  SECTION 7.  DEBT AUTHORIZATION.
    11     (A)  PUBLIC IMPROVEMENTS.--THE GOVERNOR, AUDITOR GENERAL AND
    12  STATE TREASURER ARE HEREBY AUTHORIZED AND DIRECTED TO BORROW
    13  FROM TIME TO TIME IN ADDITION TO ANY AUTHORIZATION HERETOFORE OR
    14  HEREAFTER ENACTED, ON THE CREDIT OF THE COMMONWEALTH, SUBJECT TO
    15  THE LIMITATIONS PROVIDED IN THE CURRENT CAPITAL BUDGET, MONEY
    16  NOT EXCEEDING IN THE AGGREGATE THE SUM OF $352,641,000 AS MAY BE
    17  FOUND NECESSARY TO CARRY OUT THE ACQUISITION AND CONSTRUCTION OF
    18  THE PUBLIC IMPROVEMENT PROJECTS SPECIFICALLY ITEMIZED IN A
    19  CAPITAL BUDGET.
    20     (B)  FURNITURE AND EQUIPMENT.--THE GOVERNOR, AUDITOR GENERAL
    21  AND STATE TREASURER ARE HEREBY AUTHORIZED AND DIRECTED TO BORROW
    22  FROM TIME TO TIME IN ADDITION TO ANY AUTHORIZATION HERETOFORE OR
    23  HEREAFTER ENACTED, ON THE CREDIT OF THE COMMONWEALTH, SUBJECT TO
    24  THE LIMITATIONS PROVIDED IN THE CURRENT CAPITAL BUDGET, MONEY
    25  NOT EXCEEDING IN THE AGGREGATE THE SUM OF $919,000 AS MAY BE
    26  FOUND NECESSARY TO CARRY OUT THE PUBLIC IMPROVEMENT PROJECTS
    27  CONSISTING OF THE ACQUISITION OF ORIGINAL MOVABLE FURNITURE AND
    28  EQUIPMENT SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET.
    29     (C)  REDEVELOPMENT ASSISTANCE.--SUBJECT TO THE LIMITATION IN
    30  SECTION 1616.1-B(B) OF THE ACT OF APRIL 9, 1929 (P.L.343,
    19960S1496B2221                  - 9 -

     1  NO.176), KNOWN AS THE FISCAL CODE, THE GOVERNOR, AUDITOR GENERAL
     2  AND STATE TREASURER ARE HEREBY AUTHORIZED AND DIRECTED TO BORROW
     3  FROM TIME TO TIME IN ADDITION TO ANY AUTHORIZATION HERETOFORE OR
     4  HEREAFTER ENACTED, ON THE CREDIT OF THE COMMONWEALTH, SUBJECT TO
     5  THE LIMITATIONS PROVIDED IN THE CURRENT CAPITAL BUDGET, MONEY
     6  NOT EXCEEDING IN THE AGGREGATE THE SUM OF $10,000,000 AS MAY BE
     7  FOUND NECESSARY TO CARRY OUT THE REDEVELOPMENT ASSISTANCE AND
     8  THE REDEVELOPMENT CAPITAL ASSISTANCE PROJECTS SPECIFICALLY
     9  ITEMIZED IN A CAPITAL BUDGET.
    10  SECTION 8.  ISSUE OF BONDS.
    11     THE INDEBTEDNESS AUTHORIZED IN THIS ACT SHALL BE INCURRED,
    12  FROM TIME TO TIME, AND SHALL BE EVIDENCED BY ONE OR MORE SERIES
    13  OF GENERAL OBLIGATION BONDS OF THE COMMONWEALTH IN SUCH
    14  AGGREGATE PRINCIPAL AMOUNT FOR EACH SERIES AS THE GOVERNOR, THE
    15  AUDITOR GENERAL AND THE STATE TREASURER SHALL DETERMINE, BUT THE
    16  LATEST STATED MATURITY DATE SHALL NOT EXCEED THE ESTIMATED
    17  USEFUL LIFE OF THE PROJECTS BEING FINANCED AS STATED IN SECTION
    18  8.
    19  SECTION 9.  ESTIMATED USEFUL LIFE AND TERM OF DEBT.
    20     (A)  ESTIMATED USEFUL LIFE.--THE GENERAL ASSEMBLY STATES THAT
    21  THE ESTIMATED USEFUL LIFE OF THE PUBLIC IMPROVEMENT PROJECTS
    22  ITEMIZED IN THIS ACT IS AS FOLLOWS:
    23         (1)  PUBLIC IMPROVEMENT PROJECTS, 30 YEARS.
    24         (2)  FURNITURE AND EQUIPMENT PROJECTS, 10 YEARS.
    25     (B)  TERM OF DEBT.--THE MAXIMUM TERM OF THE DEBT AUTHORIZED
    26  TO BE INCURRED UNDER THIS ACT IS 30 YEARS.
    27  SECTION 10.  APPROPRIATIONS.
    28     (A)  PUBLIC IMPROVEMENTS.--THE NET PROCEEDS OF THE SALE OF
    29  THE OBLIGATIONS AUTHORIZED IN THIS ACT ARE HEREBY APPROPRIATED
    30  FROM THE CAPITAL FACILITIES FUND TO THE DEPARTMENT OF GENERAL
    19960S1496B2221                 - 10 -

     1  SERVICES IN THE MAXIMUM AMOUNT OF $352,641,000 TO BE USED BY IT
     2  EXCLUSIVELY TO DEFRAY THE FINANCIAL COST OF THE PUBLIC
     3  IMPROVEMENT PROJECTS SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET.
     4  AFTER RESERVING OR PAYING THE EXPENSES OF THE SALE OF THE
     5  OBLIGATION, THE STATE TREASURER SHALL PAY TO THE DEPARTMENT OF
     6  GENERAL SERVICES THE MONEYS AS REQUIRED AND CERTIFIED BY IT TO
     7  BE LEGALLY DUE AND PAYABLE.
     8     (B)  FURNITURE AND EQUIPMENT.--THE NET PROCEEDS OF THE SALE
     9  OF THE OBLIGATIONS AUTHORIZED IN THIS ACT ARE HEREBY
    10  APPROPRIATED FROM THE CAPITAL FACILITIES FUND TO THE DEPARTMENT
    11  OF GENERAL SERVICES IN THE MAXIMUM AMOUNT OF $919,000 TO BE USED
    12  BY IT EXCLUSIVELY TO DEFRAY THE FINANCIAL COST OF THE PUBLIC
    13  IMPROVEMENT PROJECTS CONSISTING OF THE ACQUISITION OF ORIGINAL
    14  MOVABLE FURNITURE AND EQUIPMENT SPECIFICALLY ITEMIZED IN A
    15  CAPITAL BUDGET. AFTER RESERVING OR PAYING THE EXPENSES OF THE
    16  SALE OF THE OBLIGATION, THE STATE TREASURER SHALL PAY TO THE
    17  DEPARTMENT OF GENERAL SERVICES THE MONEYS AS REQUIRED AND
    18  CERTIFIED BY IT TO BE LEGALLY DUE AND PAYABLE.
    19     (C)  REDEVELOPMENT ASSISTANCE.--THE NET PROCEEDS OF THE SALE
    20  OF THE OBLIGATIONS AUTHORIZED IN THIS ACT ARE HEREBY
    21  APPROPRIATED FROM THE CAPITAL FACILITIES FUND TO THE DEPARTMENT
    22  OF COMMUNITY AFFAIRS IN THE MAXIMUM AMOUNT OF $10,000,000 TO BE
    23  USED BY IT EXCLUSIVELY TO DEFRAY THE FINANCIAL COST OF THE
    24  REDEVELOPMENT ASSISTANCE AND REDEVELOPMENT CAPITAL ASSISTANCE
    25  PROJECTS SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET. AFTER
    26  RESERVING OR PAYING THE EXPENSES OF THE SALE OF THE OBLIGATION,
    27  THE STATE TREASURER SHALL PAY TO THE DEPARTMENT OF COMMUNITY
    28  AFFAIRS THE MONEYS AS REQUIRED AND CERTIFIED BY IT TO BE LEGALLY
    29  DUE AND PAYABLE.
    30  SECTION 11.  FEDERAL FUNDS.
    19960S1496B2221                 - 11 -

     1     IN ADDITION TO THOSE FUNDS APPROPRIATED IN SECTION 10, ALL
     2  MONEYS RECEIVED FROM THE FEDERAL GOVERNMENT FOR THE PROJECTS
     3  SPECIFICALLY ITEMIZED IN THIS ACT ARE ALSO HEREBY APPROPRIATED
     4  FOR THOSE PROJECTS.
     5  SECTION 12.  SPECIAL CONTRACT PROVISIONS.
     6     (A)  ABATEMENT OF HAZARDOUS MATERIALS.--NOTWITHSTANDING ANY
     7  PROVISIONS OF LAW TO THE CONTRARY, THE DEPARTMENT OF GENERAL
     8  SERVICES MAY THROUGH A REQUEST FOR PROPOSALS AWARD A CONTRACT
     9  FOR THE DESIGN AND ADMINISTRATION OF THE ABATEMENT OF HAZARDOUS
    10  MATERIALS FROM THE TRANSPORTATION AND SAFETY BUILDING, AS
    11  ITEMIZED IN SECTION 4. THE CONTRACT MAY BE AWARDED ON THE BASIS
    12  OF THE BEST INTEREST OF THE COMMONWEALTH TO A RESPONSIVE AND
    13  RESPONSIBLE PROPOSER. ALTHOUGH COST SHALL BE CONSIDERED AS A
    14  FACTOR, IT NEED NOT BE THE DETERMINING FACTOR.
    15     (B)  DEMOLITION DESIGN AND ADMINISTRATION.--NOTWITHSTANDING
    16  ANY PROVISIONS OF LAW TO THE CONTRARY, THE DEPARTMENT OF GENERAL
    17  SERVICES MAY THROUGH A REQUEST FOR PROPOSALS AWARD A CONTRACT
    18  FOR THE DESIGN AND ADMINISTRATION OF THE DEMOLITION OF THE
    19  TRANSPORTATION AND SAFETY BUILDING, AS ITEMIZED IN SECTION 4.
    20  THE CONTRACT MAY BE AWARDED ON THE BASIS OF THE BEST INTEREST OF
    21  THE COMMONWEALTH TO A RESPONSIVE AND RESPONSIBLE PROPOSER.
    22  ALTHOUGH COST SHALL BE CONSIDERED A FACTOR, IT NEED NOT BE THE
    23  DETERMINING FACTOR.
    24     (C)  CONSTRUCTION MANAGEMENT SERVICES.--THE DEPARTMENT OF
    25  GENERAL SERVICES MAY, TO FACILITATE PROJECT MANAGEMENT, CONFLICT
    26  RESOLUTION AND TIMELY PROJECT COMPLETION, CONTRACT FOR
    27  CONSTRUCTION MANAGEMENT SERVICES FOR THE ABATEMENT OF HAZARDOUS
    28  MATERIALS, DEMOLITION AND RECONSTRUCTION OF THE TRANSPORTATION
    29  AND SAFETY BUILDING, AS ITEMIZED IN SECTION 4.
    30     (D)  PROJECT MANAGEMENT SERVICES.--THE DEPARTMENT OF GENERAL
    19960S1496B2221                 - 12 -

     1  SERVICES MAY, TO ASSURE THAT PROJECTS ARE COMPLETED QUICKLY,
     2  CONTRACT FOR PROJECT MANAGEMENT SERVICES FOR FOUR PROJECTS BEING
     3  UNDERTAKEN SIMULTANEOUSLY AT THE CAPITOL COMPLEX IN HARRISBURG.
     4  SECTION 13.  REPEALS.
     5     THE FOLLOWING PARTS OF ACTS ARE REPEALED:
     6     SECTION 3(4)(I)(A) AND (II)(E) OF THE ACT OF JULY 8, 1994
     7  (P.L.444, NO.74), KNOWN AS THE CAPITAL BUDGET PROJECT
     8  ITEMIZATION ACT FOR 1994-1995.
     9     SECTION 3(1)(V)(A) AND 3(2)(X)(A) OF THE ACT OF JULY 6, 1995
    10  (SP.SESS 1. P.L.1051, NO.19), KNOWN AS THE 1995 SPECIAL SESSION
    11  CORRECTIONS AND SECURE FACILITIES CAPITAL BUDGET PROJECT
    12  ITEMIZATION ACT.
    13     SECTION 3(1)(I)(A) OF THE ACT OF NOVEMBER 17, 1995 (SP. SESS.
    14  1, P.L.176, NO.34), KNOWN AS THE SOMERSET HOSPITAL CONVERSION
    15  SECURITY AND QUEHANNA BOOT CAMP PROJECT ITEMIZATION ACT.
    16  SECTION 14.  EDITORIAL CHANGES.
    17     IN EDITING AND PREPARING THIS ACT FOR PRINTING FOLLOWING THE
    18  FINAL ENACTMENT, THE LEGISLATIVE REFERENCE BUREAU SHALL INSERT
    19  OR REVISE LETTERS OR NUMBERS FOR PROJECTS WHERE THE LETTERS OR
    20  NUMBERS ARE MISSING OR REQUIRE REVISION. THE BUREAU SHALL ALSO
    21  REVISE THE TOTAL MONETARY AMOUNTS FOR THE TOTAL AUTHORIZATION,
    22  DEBT AUTHORIZATION, APPROPRIATIONS AND DEPARTMENTAL TOTALS AS
    23  NECESSARY TO AGREE WITH THE TOTAL MONETARY AMOUNTS OF THE
    24  PROJECTS.
    25  Section 4 15.  Effective date.                                    <--
    26     This act shall take effect July 1, 1996, or immediately,
    27  whichever is later.


    D4L72RZ/19960S1496B2221         - 13 -