PRINTER'S NO. 2236
No. 1746 Session of 1992
INTRODUCED BY CORMAN, FISHER AND STOUT, MAY 22, 1992
REFERRED TO TRANSPORTATION, MAY 22, 1992
A SUPPLEMENT 1 To the act of December 8, 1982 (P.L.848, No.235), entitled "An 2 act providing for the adoption of capital projects related to 3 the repair, rehabilitation or replacement of highway bridges 4 to be financed from current revenue or by the incurring of 5 debt and capital projects related to highway and safety 6 improvement projects to be financed from current revenue of 7 the Motor License Fund," itemizing bridge projects. 8 The General Assembly of the Commonwealth of Pennsylvania 9 hereby enacts as follows: 10 Section 1. Short title. 11 This act shall be known and may be cited as the Highway- 12 Railroad and Highway Bridge Capital Budget Supplemental Act for 13 1991-1992. 14 Section 2. Definitions. 15 The following words and phrases when used in this act shall 16 have the meanings given to them in this section unless the 17 context clearly indicates otherwise: 18 "Account." The Highway Bridge Improvement Restricted Account 19 within the Motor License Fund. 20 "Capital project." A capital project as defined in section
1 1602-B of the act of April 9, 1929 (P.L.343, No.176), known as 2 The Fiscal Code, and shall include a county or municipal bridge 3 rehabilitation, replacement or improvement project as set forth 4 in this act. 5 "Department." The Department of Transportation of the 6 Commonwealth. 7 "Secretary." The Secretary of Transportation of the 8 Commonwealth. 9 Section 3. Total authorization for bridge projects. 10 (a) Total projects.--The total authorization for the costs 11 of the projects itemized pursuant to this act and to be financed 12 from current revenue or by the incurring of debt shall be 13 $952,067,000. 14 (b) State projects.--The authorization for capital projects 15 in the category of highway projects to be constructed by the 16 department, its successors or assigns, and to be financed by the 17 incurring of debt or from the highway account, itemized in this 18 act under the category of State bridges, is $596,448,000. 19 (c) Non-State projects.--The authorization for non-State 20 highway bridge projects to be constructed by municipalities and 21 to be financed in part with grants not exceeding 80% of the non- 22 Federal share of the costs made to the local government 23 municipalities by the department from revenues deposited in the 24 account itemized in this act under the category of local 25 bridges, is $355,619,000. 26 Section 4. Itemization of bridge projects. 27 The individual capital projects in the category of highway 28 projects to be constructed by the department, its successors or 29 assigns, and to be financed from current revenue or by the 30 incurring of debt are hereby itemized, together with their 19920S1746B2236 - 2 -
1 estimated financial costs, in the following sections. 2 Section 5. Adams County. 3 (a) Local Bridges (Reserved) 4 (b) State Bridges 5 (1) S.R.3038, Crooked Creek Road over 6 Marsh Creek, Franklin Township, Bridge 7 Replacement 885,000 8 (Base Construction Allocation - 9 $750,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $125,000) 12 (2) S.R.0234, King Street over Beaver 13 Creek, East Berlin Borough, Bridge 14 Replacement 746,000 15 (Base Construction Allocation - 16 $640,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $96,000) 19 (3) S.R.3005, Pumping Station Road over 20 Plum Creek, Freedom Township, Bridge 21 Replacement 246,000 22 (Base Construction Allocation - 23 $212,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $24,000) 26 (4) S.R.2012, Bridge over Alloway Creek, 27 Mt. Joy and Germany Townships, Bridge 28 Replacement 510,000 29 (Base Construction Allocation - 30 $436,000) 19920S1746B2236 - 3 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $64,000) 3 (5) S.R.4002, Bridge over Gettysburg 4 Railroad, Butler Township, Bridge 5 Replacement 1,026,000 6 (Base Construction Allocation - 7 $889,000) 8 (Land Allocation - $5,000) 9 (Design and Contingencies - $132,000) 10 (6) Pa.194, Bridge over Tributary, Beaver 11 Creek, Abbottstown Borough, Bridge 12 Replacement 245,000 13 (Base Construction Allocation - 14 $196,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $39,000) 17 Section 6. Allegheny County. 18 (a) Local Bridges 19 (1) Wilkins Township, Ivy Street Bridge, 20 Bridge Replacement 175,000 21 (Base Construction Allocation - 22 $175,000) 23 (2) Wilkins Township, Russell Lane Bridge, 24 Bridge Replacement 175,000 25 (Base Construction Allocation - 26 $175,000) 27 (3) Wilkins Township, Baker Street Bridge, 28 Bridge Replacement 250,000 29 (Base Construction Allocation - 30 $250,000) 19920S1746B2236 - 4 -
1 (4) Shaler Township, Anderson Road Bridge 2 No.11 (WB11), Bridge Replacement 380,000 3 (Base Construction Allocation - 4 $300,000) 5 (Land Allocation - $5,000) 6 (Design and Contingencies - $75,000) 7 (5) Crescent Township, Riverview Road 8 Bridge No.6 (FU06), Bridge Replacement 755,000 9 (Base Construction Allocation - 10 $650,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $95,000) 13 (6) Pitcairn Borough, 2nd Street Bridge 14 over Dirty Camp Run Center and Wall 15 Avenues, Bridge Replacement 175,000 16 (Base Construction Allocation - 17 $175,000) 18 (7) Rankin Borough, Kenmawr Avenue Bridge, 19 Bridge Replacement 175,000 20 (Base Construction Allocation - 21 $175,000) 22 (8) Wall Borough, Spring Hill Bridge over 23 Conrail, Wall Avenue and Pa. Route 30, 24 Bridge Replacement 2,882,000 25 (Base Construction Allocation - 26 $2,882,000) 27 (9) Braddock and North Braddock Boroughs, 28 Overland Bridge over Conrail, Bridge 29 Replacement 818,000 30 (Base Construction Allocation - 19920S1746B2236 - 5 -
1 $818,000) 2 (10) Pleasant Hills Borough, Pleasant 3 Hills Boulevard Bridge No.02, Bridge 4 Replacement 1,000,000 5 (Base Construction Allocation - 6 $400,000) 7 (Land Allocation - $500,000) 8 (Design and Contingencies - $100,000) 9 (11) Emsworth Borough, Gibson Street over 10 Lowries Run, Bridge Replacement 220,000 11 (Base Construction Allocation - 12 $200,000) 13 (Design and Contingencies - $20,000) 14 (12) West View Borough, Martsolf Avenue 15 Bridge over Center Avenue, Bridge 16 Replacement 660,000 17 (Base Construction Allocation - 18 $600,000) 19 (Design and Contingencies - $60,000) 20 (13) West View Borough, Ridgewood Avenue 21 Bridge over Center Avenue, Bridge 22 Replacement 660,000 23 (Base Construction Allocation - 24 $600,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $50,000) 27 (14) Ben Avon Borough, Spruce Run Road 28 (now Alder Drive and Avalon Borough 29 Building), Bridge Replacement 70,000 30 (15) Ben Avon Borough, Spruce Run Road 19920S1746B2236 - 6 -
1 near Building Mill Lumber Company, 2 Bridge Replacement 70,000 3 (Base Construction Allocation - 4 $70,000) 5 (16) Emsworth Borough, Herron Avenue over 6 Lowries Run, Bridge Replacement 560,000 7 (Base Construction Allocation - 8 $500,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $50,000) 11 (17) City of Pittsburgh, Greenfield Avenue 12 Bridge No.39, Bridge Replacement 380,000 13 (Base Construction Allocation - 14 $300,000) 15 (Land Allocation - $5,000) 16 (Design and Contingencies - $75,000) 17 (18) City of Pittsburgh, Corliss Tunnel 18 No.18, Bridge Replacement 1,575,000 19 (Base Construction Allocation - 20 $1,400,000) 21 (Design and Contingencies - $175,000) 22 (19) City of Pittsburgh, Mission Street 23 Bridge East No.60, Bridge Replacement 880,000 24 (Base Construction Allocation - 25 $800,000) 26 (Design and Contingencies - $80,000) 27 (20) City of Pittsburgh, Mission Street 28 Bridge West No.60, Bridge Replacement 2,900,000 29 (Base Construction Allocation - 30 $1,400,000) 19920S1746B2236 - 7 -
1 (Design and Contingencies - $1,500,000) 2 (21) City of Pittsburgh, Acrata Way Bridge 3 No.4, Bridge Replacement 1,115,000 4 (Base Construction Allocation - 5 $1,000,000) 6 (Design and Contingencies - $115,000) 7 (22) Port Authority of Allegheny County, 8 Lowries Run Viaduct BMS 9 No.02742900009004, Emsworth Bridge, 10 Bridge Replacement 126,000 11 (Base Construction Allocation - 12 $126,000) 13 (23) Bethel Park Borough, Brownsville and 14 Library Roads Bridge No.6 over Piney 15 Fork Creek, Bridge Replacement 490,000 16 (Base Construction Allocation - 17 $385,000) 18 (Land Allocation - $5,000) 19 (Design and Contingencies - $100,000) 20 (24) Bethel Park Borough, Kings School 21 Road Bridge (PY02) over North Branch 22 Piney Fork, Bridge Replacement 265,000 23 (Base Construction Allocation - 24 $225,000) 25 (Design and Contingencies - $40,000) 26 (25) Bethel Park Borough, Bethel Church 27 Road Bridge No.2 over Graesers' Run, 28 Bridge Replacement 250,000 29 (Base Construction Allocation - 30 $200,000) 19920S1746B2236 - 8 -
1 (Design and Contingencies - $50,000) 2 (26) Upper St. Clair Township, Painters' 3 Run Bridge No.2, Bridge Rehabilitation 95,000 4 (Base Construction Allocation - 5 $75,000) 6 (Design and Contingencies - $20,000) 7 (27) Upper St. Clair Township, Painters' 8 Run Bridge No.8, Bridge Replacement 290,000 9 (Base Construction Allocation - 10 $250,000) 11 (Design and Contingencies - $40,000) 12 (28) City of Pittsburgh, Mcardle Viaduct 13 No.2, Bridge Rehabilitation 2,526,000 14 (Base Construction Allocation - 15 $2,246,000) 16 (Design and Contingencies - $280,000) 17 (29) Shaler Township, Hodil Street Bridge 18 1,000 Feet Northeast of Thompson Run 19 Road, Bridge Replacement 250,000 20 (Base Construction Allocation - 21 $200,000) 22 (Land Allocation - $25,000) 23 (Design and Contingencies - $25,000) 24 (b) State Bridges 25 (1) S.R.2017, Industry Road Bridge over 26 Boyds Hollow Road, Elizabeth Township, 27 Bridge Replacement 500,000 28 (Base Construction Allocation - 29 $300,000) 30 (Land Allocation - $100,000) 19920S1746B2236 - 9 -
1 (Design and Contingencies - $100,000) 2 (2) S.R.0019, Marshall Avenue Ramp over 3 Chateau Street, City of Pittsburgh, 4 Bridge Rehabilitation 4,120,000 5 (Base Construction Allocation - 6 $3,700,000) 7 (Land Allocation - $50,000) 8 (Design and Contingencies - $370,000) 9 (3) S.R.0910, Indianola Road Bridge over 10 Deer Creek, Harmar Township, Bridge 11 Rehabilitation 1,050,000 12 (Base Construction Allocation - 13 $850,000) 14 (Land Allocation - $50,000) 15 (Design and Contingencies - $150,000) 16 (4) S.R.3001, Railroad Overhead over 17 Millers Run Road, South Fayette 18 Township, Bridge Replacement 300,000 19 (Base Construction Allocation - 20 $150,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $100,000) 23 (5) S.R.3026, Millers Run Road, Bridge 24 over Millers Run, South Fayette 25 Township, Bridge Replacement 600,000 26 (Base Construction Allocation - 27 $400,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $150,000) 30 (6) S.R.0366, Tarentum Bridge, Tarentum 19920S1746B2236 - 10 -
1 Borough and City of New Kensington, 2 Bridge Painting 3,320,000 3 (Base Construction Allocation - 4 $3,000,000) 5 (Land Allocation - $20,000) 6 (Design and Contingencies - $300,000) 7 (7) Crescent Street Bridge over Pine 8 Creek, Borough of Etna, Bridge 9 Replacement 770,000 10 (Base Construction Allocation - 11 $654,000) 12 (Land Allocation - $39,000) 13 (Design and Contingencies - $77,000) 14 (8) Montour Railroad, Trestle over 15 Brightwood Road, Bethel Park Borough, 16 Bridge Removal 180,000 17 (Base Construction Allocation - 18 $160,000) 19 (Design and Contingencies - $20,000) 20 (9) Bridgeville/Bower Hill Road, Bridge 21 Number 1 over McLaughlin Run, Upper St. 22 Clair Township, Bridge Replacement 475,000 23 (Base Construction Allocation - 24 $380,000) 25 (Land Allocation - $5,000) 26 (Design and Contingencies - $90,000) 27 (10) S.R.0051, Bridge over Lewis Run, 28 Jefferson Borough, Bridge Replacement 710,000 29 (Base Construction Allocation - 30 $600,000) 19920S1746B2236 - 11 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $100,000) 3 (11) Turnpike Ramp Bridge over U.S.22, 4 Monroeville Borough, Bridge 5 Rehabilitation 109,000 6 (Base Construction Allocation - 7 $99,000) 8 (Design and Contingencies - $10,000) 9 (12) Turnpike Ramp Bridge over U.S.22 10 Business, Monroeville Borough, Bridge 11 Rehabilitation 401,000 12 (Base Construction Allocation - 13 $365,000) 14 (Design and Contingencies - $36,000) 15 (13) Wabash Bridge over Monongahela River, 16 City of Pittsburgh, New Bridge 17 Construction 35,000,000 18 (Base Construction Allocation - 19 $30,000,000) 20 (Land Allocation - $2,000,000) 21 (Design and Contingencies - $3,000,000) 22 Section 7. Armstrong County. 23 (a) Local Bridges 24 (1) Wayne Township, T-738, Cogler Bridge 25 over South Fork Pine Creek, Bridge 26 Replacement 476,000 27 (Base Construction Allocation - 28 $421,000) 29 (Land Allocation - $15,000) 30 (Design and Contingencies - $40,000) 19920S1746B2236 - 12 -
1 (2) Valley Township, T-590, Pine Furnace 2 Bridge over South Fork Pine Creek, 3 Bridge Replacement 554,000 4 (Base Construction Allocation - 5 $499,000) 6 (Land Allocation - $15,000) 7 (Design and Contingencies - $40,000) 8 (3) East Franklin Township, T-530, Glade 9 Run Bridge over Glade Run, Bridge 10 Replacement 299,000 11 (Base Construction Allocation - 12 $256,000) 13 (Land Allocation - $8,000) 14 (Design and Contingencies - $35,000) 15 (4) Boggs Township, T-529, South Fork Pine 16 Creek Bridge over South Fork Pine 17 Creek, Bridge Replacement 567,000 18 (Base Construction Allocation - 19 $512,000) 20 (Land Allocation - $15,000) 21 (Design and Contingencies - $40,000) 22 (5) Washington Township, T-396, Simpson 23 Bridge over Huling Run, Bridge 24 Replacement 347,000 25 (Base Construction Allocation - 26 $302,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $35,000) 29 (6) Plum Creek Township, Johnston Bridge 30 over South Branch Plum Creek, Bridge 19920S1746B2236 - 13 -
1 Replacement 470,000 2 (Base Construction Allocation - 3 $415,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $45,000) 6 (7) Plum Creek Township, Gastown Bridge 7 over Plum Creek, Bridge Replacement 513,000 8 (Base Construction Allocation - 9 $463,000) 10 (Land Allocation - $5,000) 11 (Design and Contingencies - $45,000) 12 (b) State Bridges 13 (1) S.R.4023 Bridge over Limestone Run, 14 East Franklin Township, Bridge 15 Construction 590,000 16 (Base Construction Allocation - 17 $500,000) 18 (Land Allocation - $30,000) 19 (Design and Contingencies - $60,000) 20 (2) S.R.1040 Bridge over Conrail Railroad, 21 Kittanning Borough, Bridge 22 Construction 1,640,000 23 (Base Construction Allocation - 24 $1,500,000) 25 (Land Allocation - $40,000) 26 (Design and Contingencies - $100,000) 27 (3) S.R.3004, Cornplanter Run Bridge over 28 Cornplanter Run, South Buffalo 29 Township, Bridge Replacement 245,000 30 (Base Construction Allocation - 19920S1746B2236 - 14 -
1 $200,000) 2 (Land Allocation - $5,000) 3 (Design and Contingencies - $40,000) 4 (4) S.R.4023, Tarrtown Road Bridge over 5 Limestone Run, East Franklin Township, 6 Bridge Replacement 1,300,000 7 (Base Construction Allocation - 8 $1,000,000) 9 (Land Allocation - $100,000) 10 (Design and Contingencies - $200,000) 11 Section 8. Beaver County. 12 (a) Local Bridges 13 (1) Beaver Falls and New Brighton 14 Boroughs, Tenth Street Bridge over 15 Beaver River, Bridge Removal 2,000,000 16 (Base Construction Allocation - 17 $1,980,000) 18 (Design and Contingencies - $20,000) 19 (2) Economy Borough, T-606 Tevebaugh 20 Bridge No.5 over Tevebaugh Run, Bridge 21 Replacement 205,000 22 (Base Construction Allocation - 23 $143,000) 24 (Land Allocation - $55,000) 25 (Design and Contingencies - $7,000) 26 (3) City of Aliquippa, Hollywood Bridge 27 over Tributary of Logtown Run, Bridge 28 Replacement 1,109,000 29 (Base Construction Allocation - 30 $1,023,000) 19920S1746B2236 - 15 -
1 (Design and Contingencies - $86,000) 2 (4) Bridgewater Borough and Brighton 3 Township, Beaver Hollow Road Bridge 4 over PL&E Railroad, Bridge Replacement 8,000,000 5 (Base Construction Allocation - 6 $7,000,000) 7 (Land Allocation - $400,000) 8 (Design and Contingencies - $600,000) 9 (b) State Bridges 10 (1) S.R.0060, Beaver Valley Expressway 11 over Brady's Run Road, Brighton 12 Township, Bridge Rehabilitation 535,000 13 (Base Construction Allocation - 14 $500,000) 15 (Land Allocation - $5,000) 16 (Design and Contingencies - $30,000) 17 (2) S.R.0060, Vanport Bridge over Ohio 18 River, Vanport Township, Bridge 19 Rehabilitation 2,200,000 20 (Base Construction Allocation - 21 $2,000,000) 22 (Land Allocation - $50,000) 23 (Design and Contingencies - $150,000) 24 (3) S.R.0051, Taggert Road Bridge over 25 Conrail, Darlington Township, Bridge 26 Replacement 2,000,000 27 (Base Construction Allocation - 28 $1,800,000) 29 (Land Allocation - $100,000) 30 (Design and Contingencies - $100,000) 19920S1746B2236 - 16 -
1 (4) S.R.4039, Bridge over Six Mile Run, 2 Brighton Township, Bridge Replacement 200,000 3 (Base Construction Allocation - 4 $160,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $20,000) 7 (5) S.R.4031 over Brady Run Tributary, 8 Brighton Township, Bridge Replacement 212,000 9 (Base Construction Allocation - 10 $180,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $22,000) 13 (6) S.R.0068, McKinleys Run Bridge over 14 McKinleys Run, Rochester Township, 15 Bridge Replacement 201,000 16 (Base Construction Allocation - 17 $177,000) 18 (Land Allocation - $2,000) 19 (Design and Contingencies - $22,000) 20 (7) S.R.0168, Bealer Run, Ohioville 21 Borough, Bridge Replacement 286,000 22 (Base Construction Allocation - 23 $250,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $26,000) 26 (8) Ambridge - Aliquippa Bridge over Ohio 27 River, Ambridge and Aliquippa Boroughs, 28 New Bridge Construction 5,000,000 29 Section 9. Bedford County. 30 (a) Local Bridges 19920S1746B2236 - 17 -
1 (1) Southampton Township, T-306, Township 2 Bridge No.1 over Black Valley Creek, 3 Bridge Replacement 360,000 4 (Base Construction Allocation - 5 $300,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $50,000) 8 (b) State Bridges (Reserved) 9 Section 10. Berks County. 10 (a) Local Bridges 11 (1) Marion Township, T-498 Scharff Road 12 over Tulpehocken Creek, Bridge 13 Replacement 740,000 14 (Base Construction Allocation - 15 $630,000) 16 (Land Allocation - $40,000) 17 (Design and Contingencies - $70,000) 18 (2) Oley Township, T-595 Yoder Road over 19 Oysterville Creek, Bridge Replacement 250,000 20 (Base Construction Allocation - 21 $210,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $30,000) 24 (3) Wyomissing Borough, Lauers Lane over 25 Wyomissing Creek, Bridge Replacement 320,000 26 (Base Construction Allocation - 27 $275,000) 28 (Land Allocation - $15,000) 29 (Design and Contingencies - $30,000) 30 (b) State Bridges 19920S1746B2236 - 18 -
1 (1) S.R.0222 under S.R.0422, City of 2 Reading, Bridge Replacement 163,000 3 (Base Construction Allocation - 4 $148,000) 5 (Design and Contingencies - $15,000) 6 (2) S.R.0222 under S.R.0422, City of 7 Reading, Bridge Replacement 262,000 8 (Base Construction Allocation - 9 $238,000) 10 (Design and Contingencies - $24,000) 11 (3) S.R.0501 over I-78, Bethel Township, 12 Bridge Replacement 1,100,000 13 (Base Construction Allocation - 14 $1,000,000) 15 (Design and Contingencies - $100,000) 16 (4) S.R.0422 over Railroad, City of 17 Reading, Bridge Replacement 410,000 18 (Base Construction Allocation - 19 $372,000) 20 (Design and Contingencies - $38,000) 21 (5) S.R.0222 over Railroad, West Reading 22 Borough, Bridge Replacement 2,187,000 23 (Base Construction Allocation - 24 $1,988,000) 25 (Design and Contingencies - $199,000) 26 (6) S.R.0422 over Schuylkill River, City 27 of Reading, Bridge Replacement 2,033,000 28 (Base Construction Allocation - 29 $1,848,000) 30 (Design and Contingencies - $185,000) 19920S1746B2236 - 19 -
1 (7) S.R.0422 over Railroad, Cumru 2 Township, Bridge Replacement 527,000 3 (Base Construction Allocation - 4 $479,000) 5 (Design and Contingencies - $48,000) 6 (8) S.R.0422 over Schuylkill River, Cumru 7 Township, Bridge Replacement 1,345,000 8 (Base Construction Allocation - 9 $1,222,000) 10 (Design and Contingencies - $123,000) 11 (9) S.R.2032, Hill Church Road over a 12 Tributary of West Swamp Creek, Bridge 13 Replacement 215,000 14 (Base Construction Allocation - 15 $175,000) 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $20,000) 18 Section 11. Blair County. 19 (a) Local Bridges 20 (1) Frankstown Township, T-444, Falling 21 Springs, South of Canoe Creek, Bridge 22 Replacement 270,000 23 (Base Construction Allocation - 24 $225,000) 25 (Land Allocation - $20,000) 26 (Design and Contingencies - $25,000) 27 (2) Logan Township, 14th Avenue over Mill 28 Run Steam, Bridge Replacement 200,000 29 (Base Construction Allocation - 30 $175,000) 19920S1746B2236 - 20 -
1 (Design and Contingencies - $25,000) 2 (3) North Woodbury Township, T-338, 3 Central High Road near Martinsburg 4 Disposal Plant, Bridge Replacement 90,000 5 (Base Construction Allocation - 6 $75,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $5,000) 9 (b) State Bridges 10 (1) S.R.0022, Segment 0350, Offset 0000, 11 Berwind Bridge over Brush Run, 12 Frankstown Township, Bridge 13 Replacement 760,000 14 (Base Construction Allocation - 15 $650,000) 16 (Land Allocation - $25,000) 17 (Design and Contingencies - $85,000) 18 (2) S.R.0036, Segment 0120, Offset 0000, 19 North Roaring Spring Bridge over Halter 20 Creek, Taylor Township, Bridge 21 Replacement 950,000 22 (Base Construction Allocation - 23 $800,000) 24 (Land Allocation - $50,000) 25 (Design and Contingencies - $100,000) 26 (3) S.R.0220, Segment 0190, Offset 0000, 27 Newry Bridge over Poplar Run, Newry 28 Borough, Bridge Rehabilitation 750,000 29 (Base Construction Allocation - 30 $575,000) 19920S1746B2236 - 21 -
1 (Land Allocation - $100,000) 2 (Design and Contingencies - $75,000) 3 (4) S.R.2010, Segment 0010, Offset 0643, 4 East Freedom Bridge over Frankstown 5 Branch of Juniata River, Freedom 6 Township, Bridge Replacement 920,000 7 (Base Construction Allocation - 8 $790,000) 9 (Land Allocation - $25,000) 10 (Design and Contingencies - $105,000) 11 (5) S.R.2014, Segment 0040, Offset 0000, 12 Sam Rea Bridge over the Beaverdam 13 Branch of Juniata River, Hollidaysburg 14 Borough, Bridge Rehabilitation 1,210,000 15 (Base Construction Allocation - 16 $985,000) 17 (Land Allocation - $100,000) 18 (Design and Contingencies - $125,000) 19 (6) S.R.2014, Segment 0070, Offset 0000, 20 Loop Bridge over the Frankstown Branch 21 of the Juniata River, Blair Township, 22 Bridge Rehabilitation 1,185,000 23 (Base Construction Allocation - 24 $985,000) 25 (Land Allocation - $75,000) 26 (Design and Contingencies - $125,000) 27 Section 12. Bradford County. 28 (a) Local Bridges 29 (1) Rome Township, T-748, Bridge of 30 Bullard Creek, Bridge Replacement 280,000 19920S1746B2236 - 22 -
1 (Base Construction Allocation - 2 $240,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $30,000) 5 (2) Sheshequin Township, T-730, Bridge 6 No.26 over Spalding Creek, Bridge 7 Replacement 263,000 8 (Base Construction Allocation - 9 $214,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $39,000) 12 (3) West Burlington Township, T-328 Bridge 13 No.8 over Sugar Creek, Bridge 14 Replacement 317,000 15 (Base Construction Allocation - 16 $260,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $47,000) 19 (4) Canton Township, T-310, Bridge No.11 20 over Towanda Creek, Bridge Replacement 216,000 21 (Base Construction Allocation - 22 $174,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $32,000) 25 (5) Monroe Township, T-412, Bridge No.20 26 over South Branch Towanda Creek, Bridge 27 Replacement 313,000 28 (Base Construction Allocation - 29 $256,000) 30 (Land Allocation - $10,000) 19920S1746B2236 - 23 -
1 (Design and Contingencies - $47,000) 2 (6) South Creek Township, T-78, Bridge 3 No.27 over South Creek, Bridge 4 Replacement 166,000 5 (Base Construction Allocation - 6 $131,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $25,000) 9 (7) Leroy Township, T-330, Bridge No.16 10 over Towanda Creek, Bridge Replacement 443,000 11 (Base Construction Allocation - 12 $367,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $66,000) 15 (8) Windham Township, T-760, Bridge No.40 16 over Wappasening Creek, Bridge 17 Replacement 468,000 18 (Base Construction Allocation - 19 $388,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $70,000) 22 (9) Wells Township, T-751, Bridge No.37 23 over Beckwith Creek, Bridge 24 Replacement 302,000 25 (Base Construction Allocation - 26 $247,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $45,000) 29 (10) Rome Township, T-764, Bridge No.44 30 over Bullard Creek, Bridge Replacement 306,000 19920S1746B2236 - 24 -
1 (Base Construction Allocation - 2 $250,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $46,000) 5 (11) North Towanda Township, T-545, Bridge 6 No.32 over Sugar Creek, Bridge 7 Replacement 450,000 8 (Base Construction Allocation - 9 $372,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $68,000) 12 (12) Burlington Township, T-552, Bridge 13 No.6 over Sugar Creek, Bridge 14 Replacement 454,000 15 (Base Construction Allocation - 16 $376,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $68,000) 19 (13) Leroy Township, T-320, Bridge No.18 20 over Towanda Creek, Bridge Replacement 288,000 21 (Base Construction Allocation - 22 $235,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $43,000) 25 (b) State Bridges 26 (1) S.R.3012, Tributary to Towanda Creek, 27 Canton Township, Bridge Replacement 319,000 28 (Base Construction Allocation - 29 $255,000) 30 (Land Allocation - $16,000) 19920S1746B2236 - 25 -
1 (Design and Contingencies - $48,000) 2 (2) S.R.0220, Murray Creek Bridge over 3 Murray Creek, Athens Township, Bridge 4 Replacement 682,000 5 (Base Construction Allocation - 6 $546,000) 7 (Land Allocation - $34,000) 8 (Design and Contingencies - $102,000) 9 Section 13. Bucks County. 10 (a) Local Bridges (Reserved) 11 (b) State Bridges 12 (1) S.R.0032, River Road Bridge at Fleecy 13 Dale Road over Paunacussing Creek, 14 Solebury Township, Bridge Replacement 1,100,000 15 (Base Construction Allocation - 16 $1,000,000) 17 (Design and Contingencies - $100,000) 18 (2) S.R.1014, Geigel Hill Bridge over 19 Branch of Swamp Creek, Tinicum 20 Township, Bridge Rehabilitation 242,000 21 (Base Construction Allocation - 22 $200,000) 23 (Land Allocation - $5,000) 24 (Design and Contingencies - $37,000) 25 (3) S.R.1016, Delaware Road Bridge over 26 Pennsylvania Canal, Rigelsville 27 Borough, Bridge Replacement 2,133,000 28 (Base Construction Allocation - 29 $1,688,000) 30 (Land Allocation - $175,000) 19920S1746B2236 - 26 -
1 (Design and Contingencies - $270,000) 2 (4) S.R.2035, Richliew Road Bridge over 3 Poquessing Creek, Bensalem Township, 4 Bridge Replacement 354,000 5 (Base Construction Allocation - 6 $295,000) 7 (Land Allocation - $30,000) 8 (Design and Contingencies - $29,000) 9 (5) S.R.2095, Dark Hollow Road Bridge over 10 Neshaminy Creek, Buckingham Township, 11 Bridge Replacement 926,000 12 (Base Construction Allocation - 13 $815,000) 14 (Land Allocation - $30,000) 15 (Design and Contingencies - $81,000) 16 (6) S.R.0202, Doylestown Bypass, Pa.611 to 17 Pa.262, 8 bridges, Doylestown and 18 Buckingham Townships, Bridge Deck 19 Rehabilitation 4,000,000 20 (Base Construction Allocation - 21 $3,800,000) 22 (Design and Contingencies - $200,000) 23 (7) S.R.0001, Langhorne Bypass, Pa.213 to 24 Pa. Turnpike, 5 bridges, Bensalem and 25 Middletown Townships, Bridge Deck 26 Rehabilitation 10,000,000 27 (Base Construction Allocation - 28 $9,500,000) 29 (Design and Contingencies - $500,000) 30 (8) S.R.0152, State Road Bridge over 19920S1746B2236 - 27 -
1 SEPTA, West Rockhill Township, Bridge 2 Deck Rehabilitation 500,000 3 (Base Construction Allocation - 4 $475,000) 5 (Design and Contingencies - $25,000) 6 (9) S.R.0212, Richlandtown Road Bridge 7 over Tohickon Creek, Quakertown, Bridge 8 Deck Rehabilitation 510,000 9 (Base Construction Allocation - 10 $485,000) 11 (Design and Contingencies - $25,000) 12 (10) S.R.0611, Easton Road Bridge over 13 Deep Run, Bedminister Township, Bridge 14 Deck Rehabilitation 500,000 15 (Base Construction Allocation - 16 $475,000) 17 (Design and Contingencies - $25,000) 18 (11) S.R.0611, Easton Road Bridge over 19 Tohickon Creek, Bedminister Township, 20 Bridge Deck Rehabilitation 700,000 21 (Base Construction Allocation - 22 $665,000) 23 (Design and Contingencies - $35,000) 24 (12) S.R.0611, Easton and Creamery Roads, 25 Tinicum Township, Bridge Deck 26 Rehabilitation 350,000 27 (Base Construction Allocation - 28 $332,000) 29 (Design and Contingencies - $18,000) 30 (13) S.R.2006, Newportville-Falls Road 19920S1746B2236 - 28 -
1 Bridge over Neshaminy Creek, Bensalem 2 Township, Bridge Deck Rehabilitation 1,400,000 3 (Base Construction Allocation - 4 $1,330,000) 5 (Design and Contingencies - $70,000) 6 (14) S.R.2020, Bristol/Tyburn Road Bridge 7 over Amtrak, Falls Township, Bridge 8 Deck Rehabilitation 1,100,000 9 (Base Construction Allocation - 10 $1,045,000) 11 (Design and Contingencies - $55,000) 12 (15) S.R.2020, Tyburn Road at Warner 13 Company Road, Falls Township, Bridge 14 Deck Rehabilitation 600,000 15 (Base Construction Allocation - 16 $570,000) 17 (Design and Contingencies - $30,000) 18 (16) S.R.2020, Tyburn Road over Conrail 19 Spur, Falls Township, Bridge Deck 20 Rehabilitation 650,000 21 (Base Construction Allocation - 22 $618,000) 23 (Design and Contingencies - $32,000) 24 (17) S.R.2020, Tyburn Road at Pennsylvania 25 Avenue, Falls Township, Bridge Deck 26 Rehabilitation 450,000 27 (Base Construction Allocation - 28 $428,000) 29 (Design and Contingencies - $22,000) 30 (18) S.R.0513, Hulmeville Road, Bridge 19920S1746B2236 - 29 -
1 over a Tributary of Poquessing Creek, 2 Bensalem Township, Bridge Replacement 400,000 3 (Base Construction Allocation - 4 $315,000) 5 (Land Allocation - $35,000) 6 (Design and Contingencies - $50,000) 7 (19) Schofield Covered Bridge, Tyler State 8 Park, Covered Bridge Trail over 9 Nesmaminy Creek, Newton Township and 10 Northampton Township, Bridge 11 Replacement 750,000 12 (Base Construction Allocation - 13 $600,000) 14 (Land Allocation - $25,000) 15 (Design and Contingencies - $125,000) 16 (20) S.R.2002, Radcliffe Street over Adams 17 Hollow Creek, Bristol Borough, Bridge 18 Replacement 335,000 19 (Base Construction Allocation - 20 $250,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $35,000) 23 Section 14. Butler County. 24 (a) Local Bridges 25 (1) City of Butler, West New Castle Street 26 Bridge over Sullivan Run, Bridge 27 Replacement 500,000 28 (Base Construction Allocation - 29 $420,000) 30 (Land Allocation - $20,000) 19920S1746B2236 - 30 -
1 (Design and Contingencies - $60,000) 2 (2) City of Butler, T-362, West Penn 3 Street Bridge over Sullivan Run, Bridge 4 Replacement 450,000 5 (Base Construction Allocation - 6 $375,000) 7 (Land Allocation - $15,000) 8 (Design and Contingencies - $60,000) 9 (3) City of Butler, T-354, Mercer Street 10 Bridge over Sullivan Run, Bridge 11 Replacement 500,000 12 (Base Construction Allocation - 13 $415,000) 14 (Land Allocation - $25,000) 15 (Design and Contingencies - $60,000) 16 (4) City of Butler, T-319, West Brady 17 Street Bridge over Sullivan Run, Bridge 18 Replacement 500,000 19 (Base Construction Allocation - 20 $420,000) 21 (Land Allocation - $20,000) 22 (Design and Contingencies - $60,000) 23 (5) Parker Township, T-731, Jones Bridge 24 over North Branch Bear Creek, Bridge 25 Replacement 585,000 26 (Base Construction Allocation - 27 $530,000) 28 (Land Allocation - $15,000) 29 (Design and Contingencies - $40,000) 30 (6) Adams Township, T-382, Glade Run 19920S1746B2236 - 31 -
1 Bridge over Glade Run, Bridge 2 Replacement 520,000 3 (Base Construction Allocation - 4 $470,000) 5 (Design and Contingencies - $15,000) 6 (Land Allocation - $35,000) 7 (7) Donegal Township, T-830, Rattigan Road 8 Bridge, Bridge Replacement 190,000 9 (Base Construction Allocation - 10 $190,000) 11 (8) Donegal Township, T-830, Buffalo Creek 12 Bridge, Bridge Replacement 270,000 13 (Base Construction Allocation - 14 $270,000) 15 (9) Clearfield Township, T-664, McMillen 16 Bridge over Little Buffalo Run, Bridge 17 Replacement 420,000 18 (Base Construction Allocation - 19 $365,000) 20 (Land Allocation - $15,000) 21 (Design and Contingencies - $40,000) 22 (10) Winfield Township, T-656, Cornplanter 23 Road Bridge, Bridge Replacement 5,000 24 (Base Construction Allocation - $5,000) 25 (11) Butler Township, Saw Mill Run Bridge, 26 Saw Mill Run Park, Bridge Replacement 84,000 27 (Base Construction Allocation - 28 $84,000) 29 (12) Adams Township, T-352, Kaufman Run 30 Bridge over Kaufman Run, Bridge 19920S1746B2236 - 32 -
1 Replacement 339,000 2 (Base Construction Allocation - 3 $299,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $30,000) 6 (13) Penn Township, T-380, Anderson Run 7 Bridge over Anderson Run, Bridge 8 Replacement 269,000 9 (Base Construction Allocation - 10 $226,000) 11 (Land Allocation - $8,000) 12 (Design and Contingencies - $35,000) 13 (14) Zelienople Borough, Market Street 14 Bridge over Glade Run, Bridge 15 Replacement 301,000 16 (Base Construction Allocation - 17 $258,000) 18 (Land Allocation - $8,000) 19 (Design and Contingencies - $35,000) 20 (15) City of Butler, West New Castle 21 Street Bridge over Sullivan Run, Bridge 22 Replacement 500,000 23 (Base Construction Allocation - 24 $420,000) 25 (Land Allocation - $20,000) 26 (Design and Contingencies - $60,000) 27 (16) Jefferson Township, T-556, Thorn 28 Creek Bridge over Thorn Creek, Bridge 29 Replacement 251,000 30 (Base Construction Allocation - 19920S1746B2236 - 33 -
1 $208,000) 2 (Land Allocation - $8,000) 3 (Design and Contingencies - $35,000) 4 (17) Jefferson Township, T-579, Thorn 5 Creek Bridge over Thorn Creek, Bridge 6 Replacement 520,000 7 (Base Construction Allocation - 8 $470,000) 9 (Land Allocation - $15,000) 10 (Design and Contingencies - $35,000) 11 (b) State Bridges 12 (1) S.R.0528, Evans City Bridge over B&O 13 Railroad, Forward Township, Bridge 14 Replacement 1,480,000 15 (Base Construction Allocation - 16 $1,400,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $60,000) 19 (2) S.R.0288 over Connoquenessing Creek, 20 Zelienople Borough, Bridge Replacement 1,380,000 21 (Base Construction Allocation - 22 $1,300,000) 23 (Land Allocation - $20,000) 24 (Design and Contingencies - $60,000) 25 (3) S.R.3014, South Evans City Bridge over 26 Wolfe Creek, Adams Township, Bridge 27 Replacement 570,000 28 (Base Construction Allocation - 29 $500,000) 30 (Land Allocation - $20,000) 19920S1746B2236 - 34 -
1 (Design and Contingencies - $50,000) 2 (4) S.R.3017 over Kaufman Run, Adams 3 Township, Bridge Replacement 580,000 4 (Base Construction Allocation - 5 $500,000) 6 (Land Allocation - $20,000) 7 (Design and Contingencies - $60,000) 8 (5) S.R.3001, Lyndora Viaduct over 9 Connoquenessing Creek, City of Butler, 10 Bridge Replacement 5,335,000 11 (Base Construction Allocation - 12 $4,850,000) 13 (Design and Contingencies - $485,000) 14 (6) Main Street Viaduct, Route No.8 over 15 B&LE - B&O Railroads, City of Butler, 16 Bridge Replacement 23,000,000 17 (Base Construction Allocation - 18 $10,800,000) 19 Land Allocation - $700,000) 20 (Design and Contingencies - 21 $11,500,000) 22 (7) S.R.0356, Wayne Street Viaduct over 23 Connoquenessing Creek, City of Butler, 24 Bridge Replacement 902,000 25 (Base Construction Allocation - 26 $902,000) 27 (8) Main Street Viaduct over B&LE - B&O 28 Railroads, City of Butler, Bridge 29 Replacement 980,000 30 (Base Construction Allocation - 19920S1746B2236 - 35 -
1 $980,000) 2 (9) S.R.0356, Wayne Street Viaduct over 3 Connoquenessing Creek, City of Butler, 4 Bridge Replacement 5,150,000 5 (Base Construction Allocation - 6 $4,800,000) 7 (Land Allocation - $350,000) 8 (10) S.R.1011, Thorne Run Bridge over 9 Thorne Run, Oakland Township, Bridge 10 Replacement 305,000 11 (Base Construction Allocation - 12 $250,000) 13 (Land Allocation - $25,000) 14 (Design and Contingencies - $30,000) 15 (11) S.R.0108, Wolf Run Bridge over Wolf 16 Run, Worth Township, Bridge 17 Replacement 1,100,000 18 (Base Construction Allocation - 19 $1,100,000) 20 (12) S.R.1011, Thorne Run Bridge over 21 Thorne Run, Oakland Township, Bridge 22 Replacement 305,000 23 (Base Construction Allocation - 24 $250,000) 25 (Land Allocation - $25,000) 26 (Design and Contingencies - $30,000) 27 Section 15. Cambria County 28 (a) Local Bridges 29 (1) Barr Township, T-496 Dutch Run Bridge, 30 Bridge Replacement 115,000 19920S1746B2236 - 36 -
1 (Base Construction Allocation - 2 $100,000) 3 (Land Allocation - $5,000) 4 (Design and Contingencies - $10,000) 5 (2) East Taylor Township, T-380 Henchstone 6 Run Bridge, Bridge Replacement 115,000 7 (Base Construction Allocation - 8 $100,000) 9 (Land Allocation - $5,000) 10 (Design and Contingencies - $10,000) 11 (3) Croyle Township, T-330 Croyle Township 12 Bridge, Bridge Replacement 300,000 13 (Base Construction Allocation - 14 $300,000) 15 (4) Dale Borough, Annie Street Bridge, 16 Bridge Replacement 500,000 17 (Base Construction Allocation - 18 $500,000) 19 (5) Spangler Borough, South 15th Street 20 Bridge, Bridge Replacement 100,000 21 (Base Construction Allocation - 22 $100,000) 23 (6) Spangler Borough, South 7th Street 24 Bridge, Bridge Replacement 100,000 25 (Base Construction Allocation - 26 $100,000) 27 (7) Carrolltown Borough, CB-1 Carrolltown 28 Treatment Plant Access Road Bridge, 29 Bridge Replacement 939,000 30 (Base Construction Allocation - 19920S1746B2236 - 37 -
1 $939,000) 2 (8) Loraine Borough, Highland Drive 3 Bridge, Bridge Replacement 50,000 4 (Base Construction Allocation - 5 $50,000) 6 (9) Portage Borough, Gellespie Avenue, 7 Trout Run Bridge No.1, Bridge 8 Replacement 422,000 9 (Base Construction Allocation - 10 $422,000) 11 (10) Spangler Borough, South 15th Street 12 Bridge over Fox Run, Bridge 13 Replacement 250,000 14 (Base Construction Allocation - 15 $250,000) 16 (11) Portage Township, Conemaugh Avenue, 17 Trout Run Bridge No.3, Bridge 18 Replacement 394,000 19 (Base Construction Allocation - 20 $394,000) 21 (12) Portage Borough, Sonman Avenue, Trout 22 Run Bridge No.4, Bridge Replacement 661,000 23 (Base Construction Allocation - 24 $661,000) 25 (13) Portage Borough, Jefferson Avenue, 26 Trout Run Bridge No.2, Bridge 27 Replacement 469,000 28 (Base Construction Allocation - 29 $469,000) 30 (14) Susquehanna Township, T-559, Allport 19920S1746B2236 - 38 -
1 Bridge No.5, Bridge Replacement 500,000 2 (Base Construction Allocation - 3 $500,000) 4 (15) Barr Township, T-548, North Spangler 5 Bridge No.4, Bridge Replacement 700,000 6 (Base Construction Allocation - 7 $700,000) 8 (16) Hastings Borough, Third Avenue Bridge 9 No.6, Bridge Replacement 500,000 10 (Base Construction Allocation - 11 $500,000) 12 (17) Allegheny Township, T-452, Wildwood 13 Bridge, Bridge Replacement 500,000 14 (Base Construction Allocation - 15 $500,000) 16 (18) Dean Township, T-521, Dean Bridge 17 No.11, Bridge Replacement 500,000 18 (Base Construction Allocation - 19 $500,000) 20 (19) Clearfield Township, T-517, Chest 21 Creek Bridge No.7, Bridge Replacement 500,000 22 (Base Construction Allocation - 23 $500,000) 24 (20) Blacklick Township, T-549, Red Mill 25 Bridge No.1, Bridge Replacement 500,000 26 (Base Construction Allocation - 27 $500,000) 28 (21) White Township, T-561, Van Orner 29 Bridge No.10, Bridge Replacement 500,000 30 (Base Construction Allocation - 19920S1746B2236 - 39 -
1 $500,000) 2 (b) State Bridges 3 (1) S.R.0053, North Armsbury Bridge, 4 Gallitzin Township, Bridge Replacement 1,018,000 5 (Base Construction Allocation - 6 $1,018,000) 7 (2) S.R.0053, South Van Ormer Bridge, 8 Reade Township, Bridge Replacement 570,000 9 (Base Construction Allocation - 10 $570,000) 11 (3) S.R.0053, Brady Run Bridge, Gallitzin 12 Township, Bridge Replacement 2,635,000 13 (Base Construction Allocation - 14 $2,635,000) 15 (4) S.R.0271, Maple Street Bridge, City of 16 Johnstown, Bridge Replacement 2,250,000 17 (Base Construction Allocation - 18 $2,250,000) 19 (5) S.R.0164, Sonman Run Bridge, Portage 20 Borough, Bridge Replacement 550,000 21 (Base Construction Allocation - 22 $550,000) 23 (6) S.R.0240 and S.R.0219, Junction 24 Bridge, Susquehanna Township, Bridge 25 Replacement 1,170,000 26 (Base Construction Allocation - 27 $1,170,000) 28 (7) S.R.0253, Houtzdale Road Bridge, Reade 29 Township, Bridge Replacement 540,000 30 (Base Construction Allocation - 19920S1746B2236 - 40 -
1 $540,000) 2 (8) S.R.1001, Loretta Road Bridge, 3 Allegheny Township, Bridge Replacement 620,000 4 (Base Construction Allocation - 5 $620,000) 6 (9) S.R.2014, Bridge over North Branch of 7 Little Conemaugh Run, Munster Township, 8 Bridge Replacement 555,000 9 (Base Construction Allocation - 10 $555,000) 11 (10) S.R.4021, Brubakers Run Bridge, 12 Hastings Borough, Bridge Replacement 515,000 13 (Base Construction Allocation - 14 $515,000) 15 (11) S.R.0271, Maple Street Bridge over 16 Little Conemaugh River and Conrail, 17 City of Johnstown, Bridge 18 Rehabilitation 2,225,000 19 (Base Construction Allocation - 20 $2,000,000) 21 (Land Allocation - $25,000) 22 (Design and Contingencies - $200,000) 23 Section 16. Cameron County. 24 (a) Local Bridges (Reserved) 25 (b) State Bridges 26 (1) S.R.0555, Hicks Run Bridge over Hicks 27 Run, Gibson Township, Bridge 28 Replacement 1,050,000 29 (Base Construction Allocation - 30 $800,000) 19920S1746B2236 - 41 -
1 (Land Allocation - $100,000) 2 (Design and Contingencies - $150,000) 3 (2) S.R.0555, Driftwood Branch, Bridge 4 over Simmamahoning Creek, Driftwood 5 Borough, Bridge Replacement 2,050,000 6 (Base Construction Allocation - 7 $1,750,000) 8 (Land Allocation - $150,000) 9 (Design and Contingencies - $150,000) 10 Section 17. Carbon County. 11 (a) Local Bridges 12 (1) Penn Forest Township, T-516, County 13 Bridge No.12 over Mud Run, Bridge 14 Replacement 240,000 15 (Base Construction Allocation - 16 $200,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $30,000) 19 (2) East Penn Township, T-354 over Lizard 20 Creek County Bridge No.6, Bridge 21 Replacement 445,000 22 (Base Construction Allocation - 23 $390,000) 24 (Land Allocation - $15,000) 25 (Design and Contingencies - $40,000) 26 (3) Penn Forest Township, T-519, County 27 Bridge No.11 over Stoney Creek, Bridge 28 Replacement 180,000 29 (Base Construction Allocation - 30 $140,000) 19920S1746B2236 - 42 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $30,000) 3 (4) Lower Towanensing Township, Princess 4 Creek Bridge over Princess Creek, 5 Bridge Replacement 100,000 6 (Base Construction Allocation - 7 $85,000) 8 (Design and Contingencies - $15,000) 9 (5) East Penn Township, T-354, Kittanning 10 Bridge No.6 over Lizard Creek, Bridge 11 Replacement 445,000 12 (Base Construction Allocation - 13 $390,000) 14 (Land Allocation - $15,000) 15 (Design and Contingencies - $40,000) 16 (6) Parker Township, Bridge No.4 over 17 Quakake Creek, Bridge Replacement 132,000 18 (Base Construction Allocation - 19 $112,000) 20 (Design and Contingencies - $20,000) 21 (7) Towamensing Township, T-477, County 22 Bridge No.16 over Pohopoco Creek, 23 Bridge Replacement 375,000 24 (Base Construction Allocation - 25 $325,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $40,000) 28 (8) Penn Forest Township, T-512, County 29 Bridge No.13 over Mud Run, Bridge 30 Replacement 220,000 19920S1746B2236 - 43 -
1 (Base Construction Allocation - 2 $180,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $30,000) 5 (9) Towansing Township, T-447, County 6 Bridge No.16 Big Creek Bridge over 7 Pohopoco Creek, Bridge Replacement 425,000 8 (Base Construction Allocation - 9 $375,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $40,000) 12 (b) State Bridges 13 (1) S.R.0534 over Hickory Run, Kidder 14 Township, Bridge Replacement 202,000 15 (Base Construction Allocation - 16 $144,000) 17 (Land Allocation - $29,000) 18 (Design and Contingencies - $29,000) 19 (2) S.R.0534 over I-80, East Side Borough, 20 Bridge Replacement 508,000 21 (Base Construction Allocation - 22 $461,000) 23 (Design and Contingencies - $47,000) 24 Section 18. Centre County. 25 (a) Local Bridges 26 (1) Port Matilda Borough, Pedestrian 27 Bridge in Port Matilda Community Park 28 over Pa. Route No.220, Bridge 29 Replacement 165,000 30 (Base Construction Allocation - 19920S1746B2236 - 44 -
1 $135,000) 2 (Design and Contingencies - $30,000 3 (b) State Bridges 4 (1) S.R.2008, Penns Creek Bridge over 5 Penns Creek, Gregg Township, Bridge 6 Replacement 1,600,000 7 (Base Construction Allocation - 8 $1,250,000) 9 (Land Allocation - $150,000) 10 (Design and Contingencies - $200,000) 11 (2) S.R.3034, One Mile Run Bridge over One 12 Mile Run, Rush Township, Bridge 13 Replacement 500,000 14 (Base Construction Allocation - 15 $300,000) 16 (Land Allocation - $100,000) 17 (Design and Contingencies - $100,000) 18 (3) S.R.4004, McCormick Run Bridge over 19 McCormick Run, Union Township, Bridge 20 Replacement 500,000 21 (Base Construction Allocation - 22 $300,000) 23 (Land Allocation - $100,000) 24 (Design and Contingencies - $100,000) 25 (4) S.R.0970, Moshannon Creek Bridge over 26 Moshannon Creek, Snow Shoe Township, 27 Bridge Replacement 1,600,000 28 (Base Construction Allocation - 29 $1,250,000) 30 (Land Allocation - $150,000) 19920S1746B2236 - 45 -
1 (Design and Contingencies - $200,000) 2 Section 19. Chester County. 3 (a) Local Bridges 4 (1) West Goshen Township, South Bolmar 5 Street Bridge over SEPTA, Bridge 6 Replacement 380,000 7 (Base Construction Allocation - 8 $300,000) 9 (Land Allocation - $50,000) 10 (Design and Contingencies - $30,000) 11 (b) State Bridges 12 (1) S.R.0113, Uwchlan Avenue Bridge over 13 U.S.30 Bypass, East Caln Township, 14 Bridge Deck Rehabilitation 400,000 15 (Base Construction Allocation - 16 $380,000) 17 (Design and Contingencies - $20,000) 18 (2) S.R.3069, Grove Road over Broad Run, 19 West Whiteland Township, Bridge 20 Replacement 380,000 21 (Base Construction Allocation - 22 $300,000) 23 (Land Allocation - $50,000) 24 (Design and Contingencies - $30,000) 25 Section 20. Clarion County. 26 (a) Local Bridges (Reserved) 27 (b) State Bridges 28 (1) S.R.0066, Limestone Railroad Overpass 29 over Penn Central Railroad, Limestone 30 Township, Bridge Replacement 1,110,000 19920S1746B2236 - 46 -
1 (Base Construction Allocation - 2 $1,000,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $100,000) 5 Section 21. Clearfield County. 6 (a) Local Bridges 7 (1) Graham Township, T-697 over Moravian 8 Run, Bridge Replacement 405,000 9 (Base Construction Allocation - 10 $360,000) 11 (Land Allocation - $5,000) 12 (Design and Contingencies - $40,000) 13 (b) State Bridges 14 (1) S.R.0322, Anderson Creek Bridge over 15 Anderson Creek, Union Township, Bridge 16 Replacement 1,500,000 17 (Base Construction Allocation - 18 $1,300,000) 19 (Land Allocation - $100,000) 20 (Design and Contingencies - $100,000) 21 (2) S.R.0219, South Brady Street Bridge 22 over B&P Railroad and Pentz Run, City 23 of DuBois, Bridge Replacement 2,050,000 24 (Base Construction Allocation - 25 $1,775,000) 26 (Land Allocation - $100,000) 27 (Design and Contingencies - $175,000) 28 (3) S.R.0053, Beaver Run Bridge over 29 Beaver Run, Houtzdale Borough, Bridge 30 Replacement 650,000 19920S1746B2236 - 47 -
1 (Base Construction Allocation - 2 $450,000) 3 (Land Allocation - $100,000) 4 (Design and Contingencies - $100,000) 5 (4) S.R.0153, Beaver Run Bridge over 6 Beaver Run, Houtzdale Borough, Bridge 7 Replacement 650,000 8 (Base Construction Allocation - 9 $450,000) 10 (Land Allocation - $100,000) 11 (Design and Contingencies - $100,000) 12 (5) S.R.2007, Goss Run Bridge over Goss 13 Run, Brisbin Borough, Bridge 14 Replacement 550,000 15 (Base Construction Allocation - 16 $350,000) 17 (Land Allocation - $100,000) 18 (Design and Contingencies - $100,000) 19 (6) S.R.1050, Moose Creek Bridge over 20 Moose Creek, Clearfield Borough, Bridge 21 Replacement 850,000 22 (Base Construction Allocation - 23 $650,000) 24 (Land Allocation - $100,000) 25 (Design and Contingencies - $100,000) 26 (7) S.R.0255, Mine Cover-In Bridge, 27 Village of Hollywood, Bridge 28 Replacement 1,025,000 29 (Base Construction Allocation - 30 $750,000) 19920S1746B2236 - 48 -
1 (Land Allocation - $100,000) 2 (Design and Contingencies - $175,000) 3 (8) S.R.2029, Roaring Run Bridge over 4 Roaring Run, Bradford Township, Bridge 5 Replacement 550,000 6 (Base Construction Allocation - 7 $350,000) 8 (Land Allocation - $100,000) 9 (Design and Contingencies - $100,000) 10 (9) S.R.3001, Chest Creek Bridge over 11 Chest Creek, Mahaffey Borough, Bridge 12 Replacement 1,650,000 13 (Base Construction Allocation - 14 $1,300,000) 15 (Land Allocation - $150,000) 16 (Design and Contingencies - $200,000) 17 (10) S.R.2024, Little Laurel Run Bridge 18 over Little Laurel Run, Decatur 19 Township, Bridge Replacement 650,000 20 (Base Construction Allocation - 21 $450,000) 22 (Land Allocation - $100,000) 23 (Design and Contingencies - $100,000) 24 (11) S.R.3014, Chest Creek Bridge over 25 Chest Creek, Chest Township, Bridge 26 Replacement 950,000 27 (Base Construction Allocation - 28 $750,000) 29 (Land Allocation - $100,000) 30 (Design and Contingencies - $100,000) 19920S1746B2236 - 49 -
1 (12) S.R.4018, Bennetts Branch Bridge over 2 Bennetts Creek, Huston Township, Bridge 3 Replacement 1,000,000 4 (Base Construction Allocation - 5 $800,000) 6 (Land Allocation - $100,000) 7 (Design and Contingencies - $100,000) 8 (13) S.R.3007, Orrs Run Bridge over Orrs 9 Run, Knox Township, Bridge Replacement 550,000 10 (Base Construction Allocation - 11 $350,000) 12 (Land Allocation - $100,000) 13 (Design and Contingencies - $100,000) 14 Section 22. Clinton County. 15 (a) Local Bridges 16 (1) Chapman Township, Old Route 120 at 17 Young Womens Creek North Bend, Bridge 18 Replacement 960,000 19 (Base Construction Allocation - 20 $854,000) 21 Land Allocation - $10,000) 22 (Design and Contingencies - $96,000) 23 (b) State Bridges 24 (1) S.R.0477, Long Run Bridge over Long 25 Run, Lamar Township, Bridge 26 Replacement 800,000 27 (Base Construction Allocation - 28 $600,000) 29 (Land Allocation - $100,000) 30 (Design and Contingencies - $100,000) 19920S1746B2236 - 50 -
1 (2) S.R.0477, Fishing Creek Bridge over 2 Tributary of Fishing Creek, Greene 3 Township, Bridge Replacement 575,000 4 (Base Construction Allocation - 5 $375,000) 6 (Land Allocation - $100,000) 7 (Design and Contingencies - $100,000) 8 (3) S.R.1016, Pine Creek Bridge over Pine 9 Creek, Pine Creek Township, Bridge 10 Replacement 3,000,000 11 (Base Construction Allocation - 12 $2,700,000) 13 (Land Allocation - $150,000) 14 (Design and Contingencies - $150,000) 15 (4) S.R.2009, Fishing Creek Bridge over 16 Fishing Creek, Logan Township, Bridge 17 Replacement 650,000 18 (Base Construction Allocation - 19 $450,000) 20 (Land Allocation - $100,000) 21 (Design and Contingencies - $100,000) 22 (5) S.R.2022, Bitner Run Bridge over 23 Bitner Run, Beech Creek Township, 24 Bridge Replacement 650,000 25 (Base Construction Allocation - 26 $450,000) 27 (Land Allocation - $100,000) 28 (Design and Contingencies - $100,000) 29 (6) S.R.2002, Cherry Run Bridge over 30 Cherry Run, Porter & Logan Townships, 19920S1746B2236 - 51 -
1 Bridge Replacement 775,000 2 (Base Construction Allocation - 3 $575,000) 4 (Land Allocation - $100,000) 5 (Design and Contingencies - $100,000) 6 (7) S.R.2008, Long Run Bridge over Long 7 Run, Lamar Township, Bridge 8 Replacement 600,000 9 (Base Construction Allocation - 10 $400,000) 11 (Land Allocation - $100,000) 12 (Design and Contingencies - $100,000) 13 (8) S.R.2016, Fishing Creek Bridge over 14 Fishing Creek, Mill Hall Borough, 15 Bridge Replacement 1,600,000 16 (Base Construction Allocation - 17 $1,250,000) 18 (Land Allocation - $150,000) 19 (Design and Contingencies - $200,000) 20 Section 23. Columbia County. 21 (a) Local Bridges 22 (1) Beaver Township, T-367, Bridge over 23 Catawissa Creek, Bridge Replacement 1,153,000 24 (Base Construction Allocation - 25 $980,000) 26 (Land Allocation - $51,000) 27 (Design and Contingencies - $122,000) 28 (2) Main Township, T-468, Columbia County 29 Bridge No.42, Bridge over Catawissa 30 Creek, Bridge Replacement 1,357,000 19920S1746B2236 - 52 -
1 (Base Construction Allocation - 2 $1,086,000) 3 (Land Allocation - $68,000) 4 (Design and Contingencies - $203,000) 5 (3) Stillwater Borough, Columbia County 6 Bridge No.136 over Raven Creek, Bridge 7 Replacement 305,000 8 (Base Construction Allocation - 9 $252,000) 10 (Land Allocation - $21,000) 11 (Design and Contingencies - $32,000) 12 (4) Main Township, T-413, Columbia County 13 Bridge No.44 over Catawissa Creek, 14 Bridge Replacement 990,000 15 (Base Construction Allocation - 16 $825,000) 17 (Land Allocation - $53,000) 18 (Design and Contingencies - $112,000) 19 (5) Mifflin Township, T-678, Columbia 20 County Bridge No.51 over Scotch Run, 21 Bridge Replacement 233,000 22 (Base Construction Allocation - 23 $189,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $24,000) 26 (6) Pine Township, T-621, Columbia County 27 Bridge No.85 over West Branch Run, 28 Bridge Replacement 564,000 29 (Base Construction Allocation - 30 $287,000) 19920S1746B2236 - 53 -
1 (Land Allocation - $240,000) 2 (Design and Contingencies - $37,000) 3 (7) Greenwood Township, T-536, Columbia 4 County Bridge No.89 over Little Fishing 5 Creek, Bridge Replacement 411,000 6 (Base Construction Allocation - 7 $343,000) 8 (Land Allocation - $25,000) 9 (Design and Contingencies - $43,000) 10 (8) Hemlock Township, T-360, Columbia 11 County Bridge No.67 over Little Fishing 12 Creek, Bridge Replacement 620,000 13 (Base Construction Allocation - 14 $525,000) 15 (Land Allocation - $21,000) 16 (Design and Contingencies - $74,000) 17 (9) Mifflin Township, T-415, Columbia 18 County Bridge No.53 over Scotch Run, 19 Bridge Replacement 265,000 20 (Base Construction Allocation - 21 $217,000) 22 (Land Allocation - $20,000) 23 (Design and Contingencies - $28,000) 24 (10) Orangeville Borough, Columbia County 25 Bridge No.118 over Conner Race, Bridge 26 Replacement 440,000 27 (Base Construction Allocation - 28 $362,000) 29 (Land Allocation - $26,000) 30 (Design and Contingencies - $52,000) 19920S1746B2236 - 54 -
1 (11) Cleveland Township, T-317, Columbia 2 County Bridge No.29 over Musser Run, 3 Bridge Replacement 223,000 4 (Base Construction Allocation - 5 $175,000) 6 (Land Allocation - $25,000) 7 (Design and Contingencies - $23,000) 8 (12) North Centre Township, T-503, 9 Columbia County Bridge No.169 over Bear 10 Creek, Bridge Replacement 274,000 11 (Base Construction Allocation - 12 $224,000) 13 (Land Allocation - $21,000) 14 (Design and Contingencies - $29,000) 15 (13) North Centre Township, T-481, 16 Columbia County Bridge No.168 over Bear 17 Creek, Bridge Replacement 270,000 18 (Base Construction Allocation - 19 $210,000) 20 (Land Allocation - $32,000) 21 (Design and Contingencies - $28,000) 22 (14) Sugarloaf Township and Main Township, 23 T-468, Bridge over Catawissa Creek, 24 Bridge Replacement 1,357,000 25 (Base Construction Allocation - 26 $1,086,000) 27 (Land Allocation - $68,000) 28 (Design and Contingencies - $203,000) 29 (b) State Bridges 30 (1) S.R.4001, Segment 0010 Offset 0349 19920S1746B2236 - 55 -
1 over North Shore Road, SEDA-COG, Bridge 2 Replacement 857,000 3 (Base Construction Allocation - 4 $686,000) 5 (Land Allocation - $43,000) 6 (Design and Contingencies - $128,000) 7 (2) S.R.1021, Segment 0010 Offset 0499 8 over Little Bear Creek, Bridge 9 Replacement 505,000 10 (Base Construction Allocation - 11 $380,000) 12 (Land Allocation - $50,000) 13 (Design and Contingencies - $75,000) 14 Section 24. Crawford County. 15 (a) Local Bridges 16 (1) Oil Creek Township, T-928, Duncan 17 Road, Bridge over Pine Creek, Bridge 18 Replacement 570,000 19 (Base Construction Allocation - 20 $500,000) 21 (Land Allocation - $20,000) 22 (Design and Contingencies - $50,000) 23 (2) East Fairfield Township, T-399, 24 Griffen Road, Bridge over Little Sugar 25 Creek, Bridge Rehabilitation 55,000 26 (Base Construction Allocation - 27 $50,000) 28 (Design and Contingencies - $5,000) 29 (3) Woodcock Township, T-652, Leimbach 30 Road, Bridge over Gravel Run, Bridge 19920S1746B2236 - 56 -
1 Replacement 570,000 2 (Base Construction Allocation - 3 $500,000) 4 (Land Allocation - $20,000) 5 (Design and Contingencies - $50,000) 6 (b) State Bridges 7 (1) S.R.1002, Venango/Railroad Bridge over 8 Conrail Railroad, Cambridge Township, 9 Bridge Replacement 880,000 10 (Base Construction Allocation - 11 $800,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $60,000) 14 (2) S.R.2029, Hydetown/Indian Run Bridge 15 over Indian Run, Hydetown Borough, 16 Bridge Replacement 260,000 17 (Base Construction Allocation - 18 $190,000) 19 (Land Allocation - $20,000) 20 (Design and Contingencies - $50,000) 21 (3) S.R.1007, Bidley Corners over Federal 22 Run, Athens Township, Bridge 23 Replacement 320,000 24 (Base Construction Allocation - 25 $272,000) 26 (Land Allocation - $16,000) 27 (Design and Contingencies - $32,000) 28 (4) S.R.1024 on Lake Road over Oil Creek, 29 BMS 20102400100354, Bloomfield 30 Township, Bridge Replacement 340,000 19920S1746B2236 - 57 -
1 (Base Construction Allocation - 2 $289,000) 3 (Land Allocation - $17,000) 4 (Design and Contingencies - $34,000) 5 (5) S.R.4011 on Grange Road over Cussewago 6 Creek, Cussewago Township, Bridge 7 Replacement 300,000 8 (Base Construction Allocation - 9 $255,000) 10 (Land Allocation - $15,000) 11 (Design and Contingencies - $30,000) 12 (6) S.R.1033, Teepleville over Mackey Run 13 Richmond Township, Bridge Replacement 280,000 14 (Base Construction Allocation - 15 $238,000) 16 (Land Allocation - $14,000) 17 (Design and Contingencies - $28,000) 18 (7) S.R.0089 on Church Run Road over Dolly 19 Run, Rome Township, Bridge Replacement 350,000 20 (Base Construction Allocation - 21 $297,000) 22 (Land Allocation - $18,000) 23 (Design and Contingencies - $35,000) 24 (8) S.R.4010 on Springboro Road over Carr 25 Run, Spring Township, Bridge 26 Replacement 375,000 27 (Base Construction Allocation - 28 $318,000) 29 (Land Allocation - $19,000) 30 (Design and Contingencies - $38,000) 19920S1746B2236 - 58 -
1 (9) S.R.0618 over Tributary of Inlet Run, 2 Summit Township, Bridge Replacement 270,000 3 (Base Construction Allocation - 4 $230,000) 5 (Land Allocation - $13,000) 6 (Design and Contingencies - $27,000) 7 (10) S.R.0006 over Conneaut Creek, Vernon 8 Township, Bridge Replacement 420,000 9 (Base Construction Allocation - 10 $360,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $40,000) 13 Section 25. Cumberland County. 14 (a) Local Bridges 15 (1) Upper Allen Township, Gettysburg Pike 16 Bridge, South of Lisburn Road, Bridge 17 Replacement 135,000 18 (Base Construction Allocation - 19 $100,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $25,000) 22 (2) Mechanicsburg Borough, Mulberry Drive 23 Bridge, Bridge Replacement 135,000 24 (Base Construction Allocation - 25 $100,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $25,000) 28 (3) Mechanicsburg Borough, Church Road at 29 Mulberry over Trindle Springs, Bridge 30 Replacement 135,000 19920S1746B2236 - 59 -
1 (Base Construction Allocation - 2 $100,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $25,000) 5 (4) Lower Allen Township, Spangler Road 6 Bridge over Conrail, Bridge 7 Replacement 825,000 8 (Base Construction Allocation - 9 $675,000) 10 (Land Allocation - $25,000) 11 (Design and Contingencies - $125,000) 12 (5) Southampton Township, T-307, 13 Fogelsonger Road Bridge over Burd Run, 14 Bridge Replacement 380,000 15 (Base Construction Allocation - 16 $300,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $60,000) 19 (6) Southampton Township, T-314, Witmer 20 Road Bridge over Yellow Breeches Creek, 21 Bridge Replacement 140,000 22 (Base Construction Allocation - 23 $90,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $40,000) 26 (7) Southampton Township, T-319, Gutshall 27 Road Bridge over Yellow Breeches Creek, 28 Bridge Replacement 135,000 29 (Base Construction Allocation - 30 $90,000) 19920S1746B2236 - 60 -
1 (Land Allocation - $5,000) 2 (Design and Contingencies - $40,000) 3 (b) State Bridges 4 (1) S.R.4021, Bloserville Road over 5 Conodoquinet Creek, Upper Frankford 6 Township, Bridge Replacement 821,000 7 (Base Construction Allocation - 8 $732,000) 9 (Land Allocation - $26,000) 10 (Design and Contingencies - $63,000) 11 (2) S.R.0011 and 0015, 3 bridges over the 12 Harrisburg Expressway, Conrail and 13 Gettysburg Road, Camp Hill Borough, 14 East Pennsboro and Lower Allen 15 Townships, Bridge Rehabilitation 6,690,000 16 (Base Construction Allocation - 17 $5,600,000) 18 (Land Allocation - $250,000) 19 (Design and Contingencies - $840,000) 20 Section 26. Dauphin County. 21 (a) Local Bridges 22 (1) Halifax Township, T-563, County Bridge 23 No.10, Ridge Road over Armstrong Creek, 24 Bridge Replacement 197,000 25 (Base Construction Allocation - 26 $170,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $17,000) 29 (2) Jefferson Township, T-551, County 30 Bridge No.13, Back Road over South Fork 19920S1746B2236 - 61 -
1 of Powells Creek, Bridge Replacement 305,000 2 (Base Construction Allocation - 3 $235,000) 4 (Land Allocation - $10,0000) 5 (Design and Contingencies - $60,000) 6 (3) Middle Paxton Township, T-304, County 7 Bridge No.23, Red Hill Road over Clarks 8 Creek, Bridge Replacement 300,000 9 (Base Construction Allocation - 10 $250,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $40,000) 13 (4) Middle Paxton Township, T-686, County 14 Bridge No.22, Singer Lane over Stoney 15 Creek, Bridge Replacement 449,000 16 (Base Construction Allocation - 17 $373,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $66,000) 20 (5) Reed Township, T-547, County Bridge 21 No.28, Shoop Farm Bridge over Powells 22 Creek, Bridge Replacement 451,000 23 (Base Construction Allocation - 24 $375,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $66,000) 27 (6) Wiconisco Township, T-707, Arch Street 28 Bridge over Wiconisco Creek, Bridge 29 Replacement 339,000 30 (Base Construction Allocation - 19920S1746B2236 - 62 -
1 $294,000) 2 (Land Allocation - $5,000) 3 (Design and Contingencies - $40,000) 4 (7) East Hanover Township, T-001, Bridge 5 No.1 on Jonestown Road over Tributary 6 to Swatara Creek, Bridge 7 Rehabilitation 150,000 8 (Base Construction Allocation - 9 $35,000) 10 (Land Allocation - $5,000) 11 (Design and Contingencies - $110,000) 12 (8) East Hanover Township, T-467, Bridge 13 No.2 on Carlson Road over Manada Creek, 14 Bridge Replacement 422,000 15 (Base Construction Allocation - 16 $340,000) 17 (Land Allocation - $12,000) 18 (Design and Contingencies - $70,000) 19 (9) East Hanover Township, T-471, Bridge 20 No.3 on North Meadow Lane over Manada 21 Creek, Bridge Replacement 315,000 22 (Base Construction Allocation - 23 $60,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $245,000) 26 (10) East Hanover Township, T-001, Bridge 27 No.4 on Jonestown Road over Manada 28 Creek, Bridge Rehabilitation 285,000 29 (Base Construction Allocation - 30 $235,000) 19920S1746B2236 - 63 -
1 (Land Allocation - $5,000) 2 (Design and Contingencies - $45,000) 3 (11) Derry Township, T-504, Park Boulevard 4 Bridge over Spring Creek, Bridge 5 Replacement 690,000 6 (Base Construction Allocation - 7 $550,000) 8 (Land Allocation - $40,000) 9 (Design and Contingencies - $100,000) 10 (b) State Bridges 11 (1) S.R.0325, Clarks Valley Road Bridge 12 over Clarks Creek, Middle Paxton 13 Township, Bridge Replacement 1,050,000 14 (Base Construction Allocation - 15 $900,000) 16 (Land Allocation - $25,000) 17 (Design and Contingencies - $125,000) 18 (2) S.R.0039, Hershey Road over Swatara 19 Creek, South Hanover Township, Bridge 20 Rehabilitation 476,000 21 (Base Construction Allocation - 22 $406,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $60,000) 25 (3) S.R.3018, Herr Street over Paxton 26 Creek, Harrisburg City, Bridge 27 Replacement 915,000 28 (Base Construction Allocation - 29 $800,000) 30 (Land Allocation - $25,000) 19920S1746B2236 - 64 -
1 (Design and Contingencies - $90,000) 2 (4) S.R.2026, Green Hill Road, Bridge over 3 Tributary to Beaver Creek, West Hanover 4 Township, Bridge Replacement 60,000 5 (Base Construction Allocation - 6 $54,000) 7 (Design and Contingencies - $6,000) 8 Section 27. Delaware County. 9 (a) Local Bridges (Reserved) 10 (b) State Bridges 11 (1) S.R.0100, Creek Road Bridge over 12 Harvey's Run, Birmingham Township, 13 Bridge Rehabilitation 285,000 14 (Base Construction Allocation - 15 $200,000) 16 (Land Allocation - $50,000) 17 (Design and Contingencies - $35,000) 18 (2) S.R.1018, Ardmore Avenue Bridge over 19 SEPTA, Haverford Township, Bridge 20 Replacement 875,000 21 (Base Construction Allocation - 22 $750,000) 23 (Land Allocation - $50,000) 24 (Design and Contingencies - $75,000) 25 (3) S.R.0001, Township Line Road over 26 SEPTA P&W, Upper Darby Township, Bridge 27 Deck Rehabilitation 225,000 28 (Base Construction Allocation - 29 $214,000) 30 (Design and Contingencies - $11,000) 19920S1746B2236 - 65 -
1 (4) S.R.0452, Market Street Bridge over 2 Amtrak, Lower Chichester Township, 3 Bridge Replacement 6,000,000 4 (Base Construction Allocation - 5 $5,700,000) 6 (Design and Contingencies - $300,000) 7 (5) S.R.0013, McDade Boulevard, Bridge 8 over Darby Creek, Darby Borough, Bridge 9 Replacement 1,000,000 10 (Base Construction Allocation - 11 $815,000) 12 (Land Allocation - $100,000) 13 (Design and Contingencies - $85,000) 14 Section 28. Elk County. 15 (a) Local Bridges (Reserved) 16 (b) State Bridges 17 (1) S.R.1004 Crooked Creek Bridge over 18 Crooked Creek, Jones Township, Bridge 19 Replacement 775,000 20 (Base Construction Allocation - 21 $575,000) 22 (Land Allocation - $100,000) 23 (Design and Contingencies - $100,000) 24 (2) S.R.0219 Rockey Run Bridge over Rockey 25 Run, Jones Township, Bridge 26 Replacement 975,000 27 (Base Construction Allocation - 28 $775,000) 29 (Land Allocation - $100,000) 30 (Design and Contingencies - $100,000) 19920S1746B2236 - 66 -
1 (3) S.R.0219 Gallagher Run Bridge over 2 Gallagher Run, Ridgway Borough, Bridge 3 Replacement 975,000 4 (Base Construction Allocation - 5 $750,000) 6 (Land Allocation - $100,000) 7 (Design and Contingencies - $125,000) 8 (4) S.R.3002 Irwin Run Bridge over Irwin 9 Run, Spring Creek Township, Bridge 10 Replacement 600,000 11 (Base Construction Allocation - 12 $400,000) 13 (Land Allocation - $100,000) 14 (Design and Contingencies - $100,000) 15 (5) S.R.3002 Millstone Creek Bridge over 16 Millstone Creek, Millstone Township, 17 Bridge Replacement 1,200,000 18 (Base Construction Allocation - 19 $1,000,000) 20 (Land Allocation - $100,000) 21 (Design and Contingencies - $100,000) 22 Section 29. Erie County. 23 (a) Local Bridges 24 (1) City of Erie, West 38th Street Bridge, 25 Bridge Replacement 312,000 26 (Base Construction Allocation - 27 $282,000) 28 (Design and Contingencies - $30,000) 29 (2) City of Erie, West South Street 30 Viaduct over Bay Front Parkway, Bridge 19920S1746B2236 - 67 -
1 Replacement 4,020,000 2 (Base Construction Allocation - 3 $3,600,000) 4 (Land Allocation - $70,000) 5 (Design and Contingencies - $350,000) 6 (3) North East Township, T-780, Bort Road 7 Bridge over Conrail Railroad, Bridge 8 Replacement 695,000 9 (Base Construction Allocation - 10 $604,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $81,000) 13 (4) Conneaut Township, T-300 over 14 Ashtabula Creek, ID No.25-720303004036, 15 Bridge Replacement 165,000 16 (Base Construction Allocation - 17 $130,000) 18 (Land Allocation - $5,000) 19 (Design and Contingencies - $30,000) 20 (5) Waterford Township, T-463, Covered 21 Bridge over LeBeouf Creek, ID No.25- 22 722004634003, Bridge Replacement 450,000 23 (Base Construction Allocation - 24 $380,000) 25 (Land Allocation - $20,000) 26 (Design and Contingencies - $50,000) 27 (6) Conneaut Township, T-360 over Conneaut 28 Creek, ID No.25-720303604035, Bridge 29 Replacement 160,000 30 (Base Construction Allocation - 19920S1746B2236 - 68 -
1 $125,000) 2 (Land Allocation - $5,000) 3 (Design and Contingencies - $30,000) 4 (7) McKean Township, T-448, Skinner Road 5 over Elk Creek, Bridge Replacement 204,000 6 (Base Construction Allocation - 7 $164,000) 8 (Land Allocation - $20,000) 9 (Design and Contingencies - $20,000) 10 (b) State Bridges 11 (1) S.R.3029 on West Road over Branch 12 Temple Creek, Elk Creek Township, 13 Bridge Replacement 251,000 14 (Base Construction Allocation - 15 $213,000) 16 (Land Allocation - $13,000) 17 (Design and Contingencies - $25,000) 18 (2) S.R.3018 on Tannery Road over 19 Interstate 90, Girard Township, Bridge 20 Rehabilitation 1,200,000 21 (Base Construction Allocation - 22 $1,020,000) 23 (Land Allocation - $60,000) 24 (Design and Contingencies - $120,000) 25 (3) S.R.0005 on East Lake Road over Four 26 Mile Creek, Lawrence Park Township, 27 Bridge Replacement 350,000 28 (Base Construction Allocation - 29 $297,000) 30 (Land Allocation - $18,000) 19920S1746B2236 - 69 -
1 (Design and Contingencies - $35,000) 2 (4) S.R.3020 on West Road over Lamson Run, 3 McKean Township, Bridge Rehabilitation 240,000 4 (Base Construction Allocation - 5 $205,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $25,000) 8 (5) S.R.4013 on Dunn Valley Road over Elk 9 Creek, BMS 25401300800214, McKean 10 Township, Bridge Replacement 320,000 11 (Base Construction Allocation - 12 $270,000) 13 (Land Allocation - $15,000) 14 (Design and Contingencies - $35,000) 15 (6) S.R.3008 on Crane Road over Trout Run, 16 Washington Township, Bridge 17 Rehabilitation 270,000 18 (Base Construction Allocation - 19 $229,000) 20 (Land Allocation - $14,000) 21 (Design and Contingencies - $27,000) 22 (7) S.R.3025 on Conneauttee Valley Road 23 over Cummings Creek, Washington 24 Township, Bridge Replacement 190,000 25 (Base Construction Allocation - 26 $160,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $20,000) 29 Section 30. Fayette County. 30 (a) Local Bridges 19920S1746B2236 - 70 -
1 (1) North Union Township, Auto Auction 2 Bridge, Old Route 51, Bridge Removal 117,000 3 (Base Construction Allocation - 4 $100,000) 5 (Land Allocation - $5,000) 6 (Design and Contingencies - $12,000) 7 (2) North Union Township, Old Route 51 8 Bridge, North of Auto Auction, Bridge 9 Removal 117,000 10 (Base Construction Allocation - 11 $100,000) 12 (Land Allocation - $5,000) 13 (Design and Contingencies - $12,000) 14 (b) State Bridges 15 (1) S.R.0166, Friendship Hill Bridge over 16 Georges Creek, Springhill and Nicholson 17 Townships, Bridge Replacement 975,000 18 (Base Construction Allocation - 19 $863,000) 20 (Land Allocation - $30,000) 21 (Design and Contingencies - $82,000) 22 (2) S.R.1037, Pittsburgh Street over Trump 23 Run, City of Connellsville, Bridge 24 Replacement 650,000 25 (Base Construction Allocation - 26 $575,000) 27 (Land Allocation - $20,000) 28 (Design and Contingencies - $55,000) 29 (3) S.R.1058, Roaring Run Bridge over 30 Roaring Run, Donegal Township, Bridge 19920S1746B2236 - 71 -
1 Replacement 580,000 2 (Base Construction Allocation - 3 $490,000) 4 (Land Allocation - $40,000) 5 (Design and Contingencies - $50,000) 6 (4) S.R.2007, Stony Run Bridge over Stony 7 Run, Wharton Township, Bridge 8 Replacement 400,000 9 (Base Construction Allocation - 10 $335,000) 11 (Land Allocation - $30,000) 12 (Design and Contingencies - $35,000) 13 Section 31. Forest County. 14 (a) Local Bridges 15 (1) Tionesta Township, T-316 on Hemlock 16 Road over Hemlock Creek, Bridge 17 Replacement 110,000 18 (Base Construction Allocation - 19 $88,000) 20 (Land Allocation - $11,000) 21 (Design and Contingencies - $11,000) 22 (b) State Bridges 23 (1) S.R.1003, Blue Jay Creek Bridge over 24 Blue Jay Creek, Howe Township, Bridge 25 Replacement 340,000 26 (Base Construction Allocation - 27 $280,000) 28 (Land Allocation - $25,000) 29 (Design and Contingencies - $35,000) 30 (2) S.R.4005 on Old Traffic Route 62 over 19920S1746B2236 - 72 -
1 Prather Creek, Hickory Township, Bridge 2 Replacement 271,000 3 (Base Construction Allocation - 4 $230,000) 5 (Land Allocation - $14,000) 6 (Design and Contingencies - $27,000) 7 Section 32. Franklin County. 8 (a) Local Bridges (Reserved) 9 (b) State Bridges 10 (1) S.R.0016, Memorial Bridge under 11 Western Maryland Railroad, Chambersburg 12 Borough, Overpass Widening 700,000 13 (Base Construction Allocation - 14 $564,000) 15 (Land Allocation - $68,000) 16 (Design and Contingencies - $68,000) 17 Section 33. Fulton County (Reserved). 18 Section 34. Greene County. 19 (a) Local Bridges 20 (1) Richhill Township, Route 356 Bridge 21 No.57 over North Fork Creek, Bridge 22 Replacement 450,000 23 (Base Construction Allocation - 24 $350,000) 25 (Land Allocation - $50,000) 26 (Design and Contingencies - $50,000) 27 (2) Springhill Township, Route 345 Bridge 28 No.68 over Fork Creek, Bridge 29 Replacement 550,000 30 (Base Construction Allocation - 19920S1746B2236 - 73 -
1 $450,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $50,000) 4 (3) Perry Township, Route 385 Bridge No.7 5 over Shannon Run, Bridge Replacement 180,000 6 (Base Construction Allocation - 7 $150,000) 8 (Land Allocation - $15,000) 9 (Design and Contingencies - $15,000) 10 (4) Gilmore Township, Route 379 Bridge 11 No.53 over Blockhouse Run, Bridge 12 Replacement 180,000 13 (Base Construction Allocation - 14 $150,000) 15 (Land Allocation - $15,000) 16 (Design and Contingencies - $15,000) 17 (5) Perry Township, Route 357 Bridge No.8 18 over Shannon Run, Bridge Replacement 260,000 19 (Base Construction Allocation - 20 $200,000) 21 (Land Allocation - $30,000) 22 (Design and Contingencies - $30,000) 23 (6) Jackson Township, Route 447 Bridge 24 No.56 over Job Creek, Bridge 25 Replacement 260,000 26 (Base Construction Allocation - 27 $200,000) 28 (Land Allocation - $30,000) 29 (Design and Contingencies - $30,000) 30 (7) Morgan Township, Route 568 Bridge 19920S1746B2236 - 74 -
1 No.23 over Ruff Creek, Bridge 2 Replacement 12,000 3 (Base Construction Allocation - 4 $12,000) 5 (8) Cumberland Township, Route 674 Bridge 6 No.10 over Muddy Run, Bridge 7 Replacement 425,000 8 (Base Construction Allocation - 9 $325,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $50,000) 12 (9) Greene Township, Route 604 Bridge 13 No.18 over Whiteley Creek, Bridge 14 Replacement 12,000 15 (Base Construction Allocation - 16 $12,000) 17 (10) Carmichaels Borough, Bridge No.11 Old 18 Town Street over Muddy Run, Bridge 19 Construction 12,000 20 (Base Construction Allocation - 21 $12,000) 22 (11) Freeport Township, Route 362 Bridge 23 No.67 over Fish Creek, Bridge 24 Replacement 450,000 25 (Base Construction Allocation - 26 $350,000) 27 (Land Allocation - $50,000) 28 (Design and Contingencies - $50,000) 29 (12) Center Township, Route 469 Bridge 30 No.65 over Gringe Run, Bridge 19920S1746B2236 - 75 -
1 Replacement 450,000 2 (Base Construction Allocation - 3 $350,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $50,000) 6 (13) Washington Township, Route 546 Bridge 7 No.24 over Ruff Creek, Bridge 8 Replacement 12,000 9 (Base Construction Allocation - 10 $12,000) 11 (14) Center Township, Route 487 Bridge 12 No.42 over Pursley Creek, Bridge 13 Replacement 12,000 14 (Base Construction Allocation - 15 $12,000) 16 (15) Center Township, Route 424 Bridge 17 No.60 over South Fork of Ten Mile 18 Creek, Bridge Replacement 12,000 19 (Base Construction Allocation - 20 $12,000) 21 (16) Washington Township, Route 550 Bridge 22 No.27 over Craynes Run, Bridge 23 Replacement 400,000 24 (Base Construction Allocation - 25 $300,000) 26 (Land Allocation - $50,000) 27 (Design and Contingencies - $50,000) 28 (17) Wayne Township, Route 371 Bridge 29 No.38 over Hoovers Run, Bridge 30 Replacement 12,000 19920S1746B2236 - 76 -
1 (Base Construction Allocation - 2 $12,000) 3 (18) Center Township, Route 511 Bridge 4 No.43 over Pursley Creek, Bridge 5 Replacement 425,000 6 (Base Construction Allocation - 7 $325,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $50,000) 10 (19) Center Township, Route 454 Bridge 11 No.85 over Hargus Creek, Bridge 12 Replacement 12,000 13 (Base Construction Allocation - 14 $12,000) 15 (20) Richhill Township, Route 346 Bridge 16 No.78 over Owens Run, Bridge 17 Replacement 425,000 18 (Base Construction Allocation - 19 $325,000) 20 (Land Allocation - $50,000) 21 (Design and Contingencies - $50,000) 22 (21) Wayne Township, Route 490 Bridge 23 No.37 over Roberts Run, Bridge 24 Replacement 140,000 25 (Base Construction Allocation - 26 $100,000) 27 (Land Allocation - $20,000) 28 (Design and Contingencies - $20,000) 29 (22) Cumberland Township, T-674, County 30 Bridge No.10, over Muddy Run, Bridge 19920S1746B2236 - 77 -
1 Replacement 489,000 2 (Base Construction Allocation - 3 $443,000) 4 (Land Allocation - $5,000) 5 (Design and Contingencies - $41,000) 6 (b) State Bridges 7 (1) S.R.0188, County Maintenance Building, 8 Bridge Replacement 875,000 9 (Base Construction Allocation - 10 $750,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $75,000) 13 (2) S.R.2016 over Whiteley Creek, 14 Monongahela Township, Bridge 15 Replacement 550,000 16 (Base Construction Allocation - 17 $500,000) 18 (Design and Contingencies - $50,000) 19 (3) S.R.3001 Enslow Fork Bridge, Richhill 20 Township, Bridge Replacement 450,000 21 (Base Construction Allocation - 22 $400,000) 23 (Design and Contingencies - $50,000) 24 (4) S.R.4033 Swartz Bridge, Washington 25 Township, Bridge Replacement 250,000 26 (Base Construction Allocation - 27 $200,000) 28 (Design and Contingencies - $50,000) 29 (5) S.R.0018 Ten Mile Creek Bridge No.3, 30 Bridge Replacement 550,000 19920S1746B2236 - 78 -
1 (Base Construction Allocation - 2 $500,000) 3 (Design and Contingencies - $50,000) 4 (6) S.R.0088 Dunkard Creek Bridge, 5 Dilliner, Bridge Replacement 1,150,000 6 (Base Construction Allocation - 7 $1,000,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $100,000) 10 (7) S.R.0188 Segment 130 Offset 1860 to 11 Segment 130 Offset 1933, Bells Bridge, 12 Bridge Replacement 550,000 13 (Base Construction Allocation - 14 $500,000) 15 (Design and Contingencies - $50,000) 16 (8) S.R.0021, Ten Mile Creek Bridge West 17 over Ten Mile Creek, Center Township, 18 Bridge Replacement 194,000 19 (Base Construction Allocation - 20 $160,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $24,000) 23 (9) S.R.3009, Hoover's Run Bridge over 24 Hoover's Run, Wayne Township, Bridge 25 Replacement 375,000 26 (Base Construction Allocation - 27 $320,000) 28 (Land Allocation - $20,000) 29 (Design and Contingencies - $35,000) 30 (10) S.R.3013, Bells Run Bridge over Bells 19920S1746B2236 - 79 -
1 Run, Wayne Township, Bridge 2 Replacement 275,000 3 (Base Construction Allocation - 4 $225,000) 5 (Land Allocation - $20,000) 6 (Design and Contingencies - $30,000) 7 (11) S.R.3013, Bulldog Run Bridge over 8 Little Run, Wayne Township, Bridge 9 Replacement 280,000 10 (Base Construction Allocation - 11 $230,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $30,000) 14 Section 35. Huntingdon County. 15 (a) Local Bridges 16 (1) Clay Township, T-341, Watkins Bridge 17 over Three Springs Creek, Bridge 18 Replacement 620,000 19 (Base Construction Allocation - 20 $496,000) 21 (Land Allocation - $31,000) 22 (Design and Contingencies - $93,000) 23 (b) State Bridges (Reserved) 24 Section 36. Indiana County. 25 (a) Local Bridges 26 (1) Green Township, T-678, Dixon Run 27 Bridge over Dixon Run, Bridge 28 Replacement 258,000 29 (Base Construction Allocation - 30 $225,000) 19920S1746B2236 - 80 -
1 (Land Allocation - $8,000) 2 (Design and Contingencies - $25,000) 3 (2) Center Township, T-680, Coral Bridge 4 over Two Lick Creek, Bridge 5 Replacement 600,000 6 (Base Construction Allocation - 7 $480,000) 8 (Land Allocation - $60,000) 9 (Design and Contingencies - $60,000) 10 (3) Plumville Borough, T-840, Plumville 11 Bridge over Plum Creek, Bridge 12 Replacement 300,000 13 (Base Construction Allocation - 14 $240,000) 15 (Land Allocation - $30,000) 16 (Design and Contingencies - $30,000) 17 (4) Rayne Township, T-611, Bridge over 18 Pine Run, Bridge Replacement 250,000 19 (Base Construction Allocation - 20 $200,000) 21 (Land Allocation - $25,000) 22 (Design and Contingencies - $25,000) 23 (5) Grant Township, T-851, Bridge over 24 East Run, Bridge Replacement 250,000 25 (Base Construction Allocation - 26 $200,000) 27 (Land Allocation - $25,000) 28 (Design and Contingencies - $25,000) 29 (6) Blairsville Borough, Ranson Road over 30 Conrail, Bridge Replacement 550,000 19920S1746B2236 - 81 -
1 (Base Construction Allocation - 2 $500,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $40,000) 5 (7) Blacklick Township, T-460, Arch Bridge 6 over Aultmans Run, Bridge Replacement 243,000 7 (Base Construction Allocation - 8 $200,000) 9 (Land Allocation - $8,000) 10 (Design and Contingencies - $35,000) 11 (8) Burrell Township, T-660, Blacklick 12 Creek Bridge over Blacklick Creek, 13 Bridge Replacement 1,010,000 14 (Base Construction Allocation - 15 $900,000) 16 (Land Allocation - $30,000) 17 (Design and Contingencies - $80,000) 18 (9) Blacklick Township, T-460, McKee 19 Bridge over Aultmans Run, Bridge 20 Replacement 288,000 21 (Base Construction Allocation - 22 $240,000) 23 (Land Allocation - $8,000) 24 (Design and Contingencies - $40,000) 25 (10) Blacklick Township, T-660, Aultmans 26 Run Bridge over Aultmans Run, Bridge 27 Replacement 301,000 28 (Base Construction Allocation - 29 $250,000) 30 (Land Allocation - $8,000) 19920S1746B2236 - 82 -
1 (Design and Contingencies - $43,000) 2 (11) Saltsburg Borough, High Street Bridge 3 over Deep Ravine, Bridge Replacement 600,000 4 (Base Construction Allocation - 5 $545,000) 6 (Land Allocation - $15,000) 7 (Design and Contingencies - $40,000) 8 (12) Clymer Borough, Wilson Street Bridge 9 over Dixon Run, Bridge Replacement 305,000 10 (Base Construction Allocation - 11 $250,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $45,000) 14 (13) Creekside Borough, Caneva Street 15 McKee Bridge over McKee Run, Bridge 16 Replacement 400,000 17 (Base Construction Allocation - 18 $352,000) 19 (Land Allocation - $8,000) 20 (Design and Contingencies - $40,000) 21 (14) Adams Township, T-382, Glade Run 22 Bridge over Glade Run, Bridge 23 Replacement 520,000 24 (Base Construction Allocation - 25 $470,000) 26 (Land Allocation - $15,000) 27 (Design and Contingencies - $35,000) 28 (15) Armstrong Township, T-414, Thomas 29 Bridge over Crooked Creek, Bridge 30 Replacement 550,000 19920S1746B2236 - 83 -
1 (Base Construction Allocation - 2 $465,000) 3 (Land Allocation - $20,000) 4 (Design and Contingencies - $65,000) 5 (b) State Bridges 6 (1) S.R.3031, Aultmans Run Bridge over 7 Aultmans Run, Blacklick Township, 8 Bridge Replacement 265,000 9 (Base Construction Allocation - 10 $220,000) 11 (Land Allocation - $15,000) 12 (Design and Contingencies - $30,000) 13 (2) S.R.0022, Blairsville East, Burrell 14 Township, Bridge Replacement 8,910,000 15 (Base Construction Allocation - 16 $8,710,000) 17 (Design and Contingencies - $200,000) 18 (3) S.R.0108, Wolfe Run Bridge over Wolfe 19 Run, Worth Township, Bridge 20 Replacement 131,000 21 (Base Construction Allocation - 22 $100,000) 23 (Land Allocation - $30,000) 24 (Design and Contingencies - $1,000) 25 (4) S.R.0022, Blairsville East, Burrell 26 Township Bridge Replacement 200,000 27 (Design and Contingencies - $200,000) 28 (5) S.R.0259, Bolivar Bridge over 29 Conemaugh River, Parkinson and Bolivar 30 Boroughs, Bridge Replacement 550,000 19920S1746B2236 - 84 -
1 (Design and Contingencies - $550,000) 2 (6) S.R.3029, Whiskey Run Bridge over 3 Whiskey Run, Young Township, Bridge 4 Replacement 503,000 5 (Base Construction Allocation - 6 $458,000) 7 (Land Allocation - $5,000) 8 (Design and Contingencies - $40,000) 9 Section 37. Jefferson County. 10 (a) Local Bridges 11 (1) Barnett Township, T-365, Cathers Run 12 Bridge over Cathers Run, Bridge 13 Replacement 435,000 14 (Base Construction Allocation - 15 $380,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $45,000) 18 (2) Eldred Township, T-342, Mill Creek 19 Bridge over Mill Creek, Bridge 20 Replacement 360,000 21 (Base Construction Allocation - 22 $312,000) 23 (Land Allocation - $8,000) 24 (Design and Contingencies - $40,000) 25 (3) Rose Township, T-567, Coder Run Bridge 26 over Coder Run, Bridge Replacement 405,000 27 (Base Construction Allocation - 28 $347,000) 29 (Land Allocation - $8,000) 30 (Design and Contingencies - $50,000) 19920S1746B2236 - 85 -
1 (b) State Bridges 2 (1) S.R.3033, Five Mile Run Bridge over 3 Five Mile Run, Knox Township, Bridge 4 Replacement 420,000 5 (Base Construction Allocation - 6 $370,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $40,000) 9 (2) S.R.3033, Sandy Lick Creek Bridge over 10 Sandy Lick Creek, Brookville Borough, 11 Bridge Replacement 1,000,000 12 (Base Construction Allocation - 13 $800,000) 14 (Land Allocation - $75,000) 15 (Design and Contingencies - $125,000) 16 Section 38. Juniata County. 17 (a) Local Bridges 18 (1) Delaware Township, T-405, Delaware 19 Creek Bridge, Bridge Replacement 165,000 20 (Base Construction Allocation - 21 $155,000) 22 (Land Allocation - $10,000) 23 (b) State Bridges 24 (1) S.R.0035, Bridge over Conrail, Mifflin 25 Borough, Bridge Replacement 1,600,000 26 (Base Construction Allocation - 27 $1,300,000) 28 (Land Allocation - $150,000) 29 (Design and Contingencies - $150,000) 30 (2) S.R.0035, Bridge over Cocolamus Creek, 19920S1746B2236 - 86 -
1 Monroe Township, Bridge Replacement 1,300,000 2 (Base Construction Allocation - 3 $1,000,000) 4 (Land Allocation - $150,000) 5 (Design and Contingencies - $150,000) 6 (3) S.R.0035, Bridge over Cocolamus Creek, 7 Fayette Township, Bridge Replacement 650,000 8 (Base Construction Allocation - 9 $450,000) 10 (Land Allocation - $100,000) 11 (Design and Contingencies - $100,000) 12 (4) S.R.0075, Bridge over Hunter's Creek, 13 Turbett Township, Bridge Replacement 4,200,000 14 (Base Construction Allocation - 15 $3,500,000) 16 (Land Allocation - $300,000) 17 (Design and Contingencies - $400,000) 18 (5) S.R.0075, Bridge over Tuscarora Creek, 19 Turbett Township, Bridge Replacement 2,550,000 20 (Base Construction Allocation - 21 $2,200,000) 22 (Land Allocation - $150,000) 23 (Design and Contingencies - $200,000) 24 (6) S.R.0075, Bridge over Conrail, Walker 25 Township, Bridge Replacement 3,000,000 26 (Base Construction Allocation - 27 $2,500,000) 28 (Land Allocation - $200,000) 29 (Design and Contingencies - $300,000) 30 (7) S.R.0235, Bridge over Stoney Run, 19920S1746B2236 - 87 -
1 Greenwood Township, Bridge Replacement 850,000 2 (Base Construction Allocation - 3 $650,000) 4 (Land Allocation - $100,000) 5 (Design and Contingencies - $100,000) 6 (8) S.R.0333, Bridge over Tributary of 7 Juniata River, Turbett Township, Bridge 8 Replacement 500,000 9 (Base Construction Allocation - 10 $300,000) 11 (Land Allocation - $100,000) 12 (Design and Contingencies - $100,000) 13 (9) S.R.1001, Bridge over Lost Run, 14 Fermanagh Township, Bridge Replacement 800,000 15 (Base Construction Allocation - 16 $600,000) 17 (Land Allocation - $100,000) 18 (Design and Contingencies - $100,000) 19 (10) S.R.1006, Bridge over Horning Run, 20 Fermanagh Township, Bridge Replacement 725,000 21 (Base Construction Allocation - 22 $500,000) 23 (Land Allocation - $100,000) 24 (Design and Contingencies - $125,000) 25 (11) S.R.1006, Bridge No.2 over Horning 26 Run, Fermanagh Township, Bridge 27 Replacement 725,000 28 (Base Construction Allocation - 29 $500,000) 30 (Land Allocation - $100,000) 19920S1746B2236 - 88 -
1 (Design and Contingencies - $125,000) 2 (12) S.R.2010, Bridge over Cocolamus 3 Creek, Delaware Township, Bridge 4 Replacement 900,000 5 (Base Construction Allocation - 6 $675,000) 7 (Land Allocation - $100,000) 8 (Design and Contingencies - $125,000) 9 (13) S.R.2019, Bridge over Cranes Run, 10 Greenwood Township, Bridge Replacement 650,000 11 (Base Construction Allocation - 12 $450,000) 13 (Land Allocation - $100,000) 14 (Design and Contingencies - $100,000) 15 (14) S.R.3031, Connector Bridge Access to 16 S.R.0075, Port Royal Borough, Bridge 17 Replacement 1,125,000 18 (Base Construction Allocation - 19 $750,000) 20 (Land Allocation - $200,000) 21 (Design and Contingencies - $175,000) 22 Section 39. Lackawanna County. 23 (a) Local Bridges 24 (1) Mayfield Borough, Chestnut Street 25 Bridge over Lackawanna River PI 26 No.043591229, Bridge Replacement 1,360,000 27 (Base Construction Allocation - 28 $1,200,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $150,000) 19920S1746B2236 - 89 -
1 (2) Archbald Borough, Wayne Street Bridge 2 over Lackawanna River PI No.043591230, 3 Bridge Replacement 1,520,000 4 (Base Construction Allocation - 5 $1,350,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $160,000) 8 (3) City of Scranton, Ash Street Bridge 9 over Roaring Brook, Bridge Replacement 900,000 10 (Base Construction Allocation - 11 $800,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $90,000) 14 (4) City of Scranton, Pocono N.E.R.R. 15 Culvert over Meadow Brook, Bridge 16 Replacement 180,000 17 (Base Construction Allocation - 18 $150,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $20,000) 21 (b) State Bridges 22 (1) S.R.0106 over Fall Brook PI 23 No.043591226, Fell Township, Bridge 24 Replacement 880,000 25 (Base Construction Allocation - 26 $775,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $95,000) 29 (2) S.R.0106 over Tunkhannock Creek PI 30 No.043591227, Greenfield Township, 19920S1746B2236 - 90 -
1 Bridge Replacement 685,000 2 (Base Construction Allocation - 3 $600,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $75,000) 6 (3) S.R.0435 over Conrail Railroad PI 7 No.043591225, Elmhurst Township, Bridge 8 Replacement 4,520,000 9 (Base Construction Allocation - 10 $4,000,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $500,000) 13 (4) S.R.2016 over Ponds Creek, Lehigh 14 Township, Bridge Replacement 486,000 15 (Base Construction Allocation - 16 $425,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $51,000) 19 (5) S.R.0435 over S.R.0348 PI 20 No.043591228, Roaring Brook Township, 21 Bridge Replacement 750,000 22 (Base Construction Allocation - 23 $660,000) 24 (Land Allocation - $ 10,000) 25 (Design and Contingencies - $80,000) 26 (6) S.R.0006 over Branch Leggetts Creek PI 27 No.04359122, South Abington Township, 28 Bridge Replacement 1,000,000 29 (Base Construction Allocation - 30 $884,000) 19920S1746B2236 - 91 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $106,000) 3 (7) S.R.2016 over Stegmeir's Pond, Lehigh 4 Township, Bridge Replacement 221,000 5 (Base Construction Allocation - 6 $188,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $23,000) 9 (8) S.R.4019 over Branch Leggetts Creek PI 10 No.04359128, Abington Township, Bridge 11 Replacement 405,000 12 (Base Construction Allocation - 13 $353,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $42,000) 16 (9) S.R.0407 over Ackerley Creek PI 17 No.043591207, Abington Township, Bridge 18 Replacement 653,000 19 (Base Construction Allocation - 20 $574,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $69,000) 23 (10) S.R.1017 over Chapman Lake Stream PI 24 No.043591209, Scott Township, Bridge 25 Replacement 558,000 26 (Base Construction Allocation - 27 $489,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $59,000) 30 (11) S.R.1029 over Hulls Creek PI 19920S1746B2236 - 92 -
1 No.043591210, Scott Township, Bridge 2 Replacement 518,000 3 (Base Construction Allocation - 4 $453,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $55,000) 7 (12) S.R.2004 over Kellum Creek PI 8 No.04359121, Madison Township, Bridge 9 Replacement 335,000 10 (Base Construction Allocation - 11 $290,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $35,000) 14 (13) S.R.0006 over Branch of Leggetts 15 Creek PI No.043591221, South Abington 16 Township, Bridge Replacement 778,000 17 (Base Construction Allocation - 18 $686,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $82,000) 21 (14) S.R.3005 over Gardners Creek PI 22 No.043591215, Ransom Township, Bridge 23 Replacement 683,000 24 (Base Construction Allocation - 25 $601,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $72,000) 28 (15) S.R.2016 over Ponds Creek PI 29 No.043591214, Lehigh Township, Bridge 30 Replacement 486,000 19920S1746B2236 - 93 -
1 (Base Construction Allocation - 2 $425,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $51,000) 5 (16) S.R.4032 over Summit Lake Creek PI 6 No.043591219, South Abington Township, 7 Bridge Replacement 425,000 8 (Base Construction Allocation - 9 $370,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $45,000) 12 (17) S.R.4032 over Leggetts Creek PI 13 No.043591220, South Abington Township, 14 Bridge Replacement 615,000 15 (Base Construction Allocation - 16 $540,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $65,000) 19 (18) S.R.0006 over S.R.0347 PI 20 No.043591223, Blakely Borough, Bridge 21 Replacement 1,564,000 22 (Base Construction Allocation - 23 $1,384,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $160,000) 26 (19) S.R.0006 over S.R.0107 PI 27 No.043591223, Mayfield Borough, Bridge 28 Replacement 2,054,000 29 (Base Construction Allocation - 30 $1,825,000) 19920S1746B2236 - 94 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $219,000) 3 (20) S.R.0690 over Van Brunt Creek PI 4 No.043591208, Moscow Borough, Bridge 5 Replacement 480,000 6 (Base Construction Allocation - 7 $420,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $50,000) 10 (21) S.R.0006 over Branch of Leggetts 11 Creek PI No.043591206, Clarks Summit 12 Borough, Bridge Replacement 980,000 13 (Base Construction Allocation - 14 $866,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $104,000) 17 (22) S.R.3013 over Lackawanna River PI 18 No.043583205, Old Forge Borough, Bridge 19 Replacement 2,175,000 20 (Base Construction Allocation - 21 $1,932,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $233,000) 24 (23) S.R.0247 over Lackawanna River PI 25 No.043591203, Jessup Borough, Bridge 26 Replacement 740,000 27 (Base Construction Allocation - 28 $650,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $80,000) 19920S1746B2236 - 95 -
1 (24) S.R.3017 over Lackawanna River PI 2 No.043591216, Old Forge Borough, Bridge 3 Replacement 2,193,000 4 (Base Construction Allocation - 5 $1,949,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $234,000) 8 (25) S.R.3019 over Branch of Lackawanna 9 River PI No.043591217, Old Forge 10 Borough, Bridge Replacement 537,000 11 (Base Construction Allocation - 12 $470,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $57,000) 15 (26) S.R.3027 over Leggetts Creek PI 16 No.043589263, City of Scranton, Bridge 17 Replacement 906,000 18 (Base Construction Allocation - 19 $800,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $96,000) 22 (27) S.R.1033 over Fall Brook PI 23 No.043591211, City of Carbondale, 24 Bridge Replacement 702,000 25 (Base Construction Allocation - 26 $618,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $74,000) 29 (28) S.R.0006 over South Branch of 30 Tunkhannock Creek PI No.043591205, 19920S1746B2236 - 96 -
1 LaPlume Township, Bridge Replacement 1,596,000 2 (Base Construction Allocation - 3 $1,416,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $170,000) 6 Section 40. Lancaster County. 7 (a) Local Bridges 8 (1) Bart Township, T-389, Drywells Road 9 over Meetinghouse Creek, Bridge 10 Replacement 420,000 11 (Base Construction Allocation - 12 $350,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $60,000) 15 (2) Earl Township, T-810, White Oak Road 16 over Big Conestoga Creek, BMS 17 36720908100304, Bridge Replacement 585,000 18 (Base Construction Allocation - 19 $500,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $75,000) 22 (3) East Earl Township, T-894, Quarry Road 23 over Conestoga River, Bridge 24 Replacement 470,000 25 (Base Construction Allocation - 26 $400,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $60,000) 29 (4) Ephrata Township, T-648, Royer Road 30 over Cocalico Creek, Bridge 19920S1746B2236 - 97 -
1 Replacement 370,000 2 (Base Construction Allocation - 3 $300,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $60,000) 6 (5) Rapho Township, T-364, Eby Chickies 7 Road over Big Chickies Creek, Bridge 8 Replacement 645,000 9 (Base Construction Allocation - 10 $550,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $85,000) 13 (6) Rapho Township, T-875, Auction Road 14 over Big Chickies Creek, Bridge 15 Replacement 395,000 16 (Base Construction Allocation - 17 $325,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $60,000) 20 (7) Salisbury Township, T-487, Buena Vista 21 Road over Pequea Creek, Bridge 22 Replacement 295,000 23 (Base Construction Allocation - 24 $225,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $60,000) 27 (8) Salisbury Township, T-904, Mount 28 Vernon Road over Pequea Creek, Bridge 29 Replacement 270,000 30 (Base Construction Allocation - 19920S1746B2236 - 98 -
1 $200,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $60,000) 4 (9) Pequea Township, T-492, Clearview Road 5 Bridge over Goods Run, Bridge 6 Replacement 32,000 7 (Base Construction Allocation - 8 $25,000) 9 (Design and Contingencies - $7,000) 10 (10) Pequea Township, T-557, Shiprock Road 11 Bridge over Small Run, Bridge 12 Replacement 105,000 13 (Base Construction Allocation - 14 $90,000) 15 (Design and Contingencies - $15,000) 16 (11) Pequea Township, T-557, Millwood Road 17 Bridge over Goods Run at Intersection 18 with Rawlinsville Road, Bridge 19 Replacement 102,000 20 (Base Construction Allocation - 21 $90,000) 22 (Design and Contingencies - $12,000) 23 (12) Pequea Township, T-557, Indian Hill 24 Road Bridge over Goods Run, Bridge 25 Replacement 90,000 26 (Base Construction Allocation - 27 $80,000) 28 (Design and Contingencies - $10,000) 29 (13) Conestoga Township, T-418, Spring Run 30 Road Bridge over Unnamed Branch of 19920S1746B2236 - 99 -
1 Tributary No.1 of Conestoga Creek, 2 Bridge Replacement 160,000 3 (Base Construction Allocation - 4 $130,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $20,000) 7 (14) East Drumore Township, T-472, Maxwell 8 Bridge Road over Tributary to Conowingo 9 Creek, Bridge Replacement 70,000 10 (Base Construction Allocation - 11 $60,000) 12 (Design and Contingencies - $10,000) 13 (15) Bart Township, T-451, Lamparter Road 14 Bridge over West Branch of Octorara 15 Creek, Bridge Replacement 80,000 16 (Base Construction Allocation - 17 $69,000) 18 (Design and Contingencies - $11,000) 19 (16) Lititz Borough, East Lincoln Avenue 20 Bridge over Santo Domingo Creek, Bridge 21 Replacement 506,000 22 (Base Construction Allocation - 23 $440,000) 24 (Design and Contingencies - $66,000) 25 (17) East Hempfield Township, Holland 26 Street Bridge over AMTRAK, Bridge 27 Replacement 350,000 28 (Base Construction Allocation - 29 $285,000) 30 (Design and Contingencies - $65,000) 19920S1746B2236 - 100 -
1 (18) East Hempfield Township, Construct 2 new Bridge on Good Drive over U.S.30, 3 Bridge Construction 2,400,000 4 (Base Construction Allocation - 5 $1,900,000) 6 (Land Allocation - $150,000) 7 (Design and Contingencies - $350,000) 8 (b) State Bridges 9 (1) S.R.1061, Willow Street over Tributary 10 of Muddy Creek, Adamstown Borough, 11 Bridge Replacement 663,000 12 (Base Construction Allocation - 13 $450,000) 14 (Land Allocation - $55,000) 15 (Design and Contingencies - $168,000) 16 (2) S.R.4009, Dillerville Road over 17 AMTRAK, Lancaster City, Bridge 18 Replacement 2,080,000 19 (Base Construction Allocation - 20 $1,800,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $270,000) 23 (3) S.R.0272, Reading Road over Indian 24 Run, Ephrata Township, Bridge 25 Replacement 1,275,000 26 (Base Construction Allocation - 27 $1,100,000) 28 (Land Allocation - $25,000) 29 (Design and Contingencies - $150,000) 30 (4) S.R.3016, Fairview Road over Conrail, 19920S1746B2236 - 101 -
1 Providence Township, Bridge 2 Replacement 1,605,000 3 (Base Construction Allocation - 4 $1,388,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $207,000) 7 (5) S.R.3030, Conestoga Boulevard over 8 Tributary of Conestoga River, Conestoga 9 Township, Bridge Replacement 150,000 10 (Base Construction Allocation - 11 $100,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $40,000) 14 (6) S.R.0222, Railroad Bridge over 15 S.R.0222, Providence Township, Bridge 16 Removal 300,000 17 (Base Construction Allocation - 18 $260,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $30,000) 21 (7) S.R.1035, North Water Street Bridge 22 over Lititz Run, Lititz Borough, Bridge 23 Replacement 253,000 24 (Base Construction Allocation - 25 $220,000) 26 (Design and Contingencies - $33,000) 27 (8) S.R.1035, North Water Street Bridge 28 over Santo Domingo Creek, Lititz 29 Borough, Bridge Replacement 253,000 30 (Base Construction Allocation - 19920S1746B2236 - 102 -
1 $220,000) 2 (Design and Contingencies - $33,000) 3 Section 41. Lawrence County. 4 (a) Local Bridges 5 (1) Slippery Rock Township, T-741, (old 6 Route 422) Rose Point Bridge No.1 over 7 Slippery Rock Creek, Bridge 8 Replacement 870,000 9 (Base Construction Allocation - 10 $800,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $20,000) 13 (2) Plain Grove Township, T-585, Cress 14 Farm Road over Tributary to Taylor Run, 15 Bridge Replacement 120,000 16 (Base Construction Allocation - 17 $106,000) 18 (Design and Contingencies - $14,000) 19 (3) Plain Grove Township, T-543, Rodgers 20 Road over Jameson Run, Bridge 21 Replacement 184,000 22 (Base Construction Allocation - 23 $170,000) 24 (Design and Contingencies - $14,000) 25 (4) Plain Grove Township, Black Road over 26 Taylor Run, Bridge Replacement 92,000 27 (Base Construction Allocation - 28 $83,000) 29 (Design and Contingencies - $9,000) 30 (5) Bridge No.72080537010 over Jameson 19920S1746B2236 - 103 -
1 Run, Bridge Replacement 139,000 2 (Base Construction Allocation - 3 $126,000) 4 (Design and Contingencies - $13,000) 5 (6) Scott Township, Bridge 6 No.37721004977016, Bridge Replacement 1,141,000 7 (Base Construction Allocation - 8 $1,027,000) 9 (Design and Contingencies - $114,000) 10 (7) Bridge No.37720805851003 East of T-498 11 Intersection, Bridge Replacement 129,000 12 (Base Construction Allocation - 13 $116,000) 14 (Design and Contingencies - $13,000) 15 (8) Slippery Rock Township, McConnels Mill 16 Road over Slippery Rock Creek, Bridge 17 Replacement 78,000 18 (Base Construction Allocation - 19 $70,000) 20 (Design and Contingencies - $8,000) 21 (9) Scott Township, Bridge 22 No.37721004857017, Bridge Replacement 610,000 23 (Base Construction Allocation - 24 $549,000) 25 (Design and Contingencies - $61,000) 26 (10) Slippery Rock Township, Kildo Road 27 Bridge over unnamed stream, Bridge 28 Replacement 581,000 29 (Base Construction Allocation - 30 $523,000) 19920S1746B2236 - 104 -
1 (Design and Contingencies - $58,000) 2 (11) Bridge No.37720805431009 near T-508, 3 Bridge Replacement 332,000 4 (Base Construction Allocation - 5 $299,000) 6 (Design and Contingencies - $33,000) 7 (12) Plain Grove Township, Reese Road over 8 Taylor Run, Bridge Replacement 9 (Base Construction Allocation - $) 10 (Land Allocation - $) 11 (Design and Contingencies - $) 12 (b) State Bridges 13 (1) S.R.1012, Freue Mill Road over Big 14 Run, Slippery Rock Township, Bridge 15 Replacement 1,210,000 16 (Base Construction Allocation - 17 $1,150,000) 18 (Land Allocation - $50,000) 19 (Design and Contingencies - $10,000) 20 (2) S.R.1014, Pine Corners Road over I-79, 21 Plain grove Township, Bridge 22 Replacement 400,000 23 (Base Construction Allocation - 24 $250,000) 25 (Land Allocation - $50,000) 26 (Design and Contingencies - $100,000) 27 (3) S.R.2028, Hills Hollow Road Bridge 28 over Hill Run, Slippery Rock Township, 29 Bridge Replacement 450,000 30 (Base Construction Allocation - 19920S1746B2236 - 105 -
1 $300,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $100,000) 4 (4) S.R.2030, Mountville Road Bridge over 5 Slippery Rock Creek, Slippery Rock & 6 Perry Townships, Bridge Replacement 400,000 7 (Base Construction Allocation - 8 $250,000) 9 (Land Allocation - $50,000) 10 (Design and Contingencies - $100,000) 11 (5) S.R.0065, L.R.79, East Washington 12 Street Bridge over Noshannock Creek, 13 New Castle City, Bridge Replacement 1,650,000 14 (Base Construction Allocation - 15 $1,525,000) 16 (Design and Contingencies - $125,000) 17 (6) S.R.0168, CSX & P&LE Underpass, Taylor 18 Township, Bridge Replacement 1,100,000 19 (Base Construction Allocation - 20 $1,000,000) 21 (Design and Contingencies - $100,000) 22 (7) S.R.1016, Liberty Road Bridge over 23 Taylor Run, Plain grove Township, 24 Bridge Replacement 350,000 25 (Base Construction Allocation - 26 $200,000) 27 (Land Allocation - $50,000) 28 (Design and Contingencies - $100,000) 29 Section 42. Lebanon County. 30 (a) Local Bridges 19920S1746B2236 - 106 -
1 (1) North Cornwall Township T-414, Dairy 2 Road over Quittapahilla Creek, Bridge 3 Replacement 321,000 4 (Base Construction Allocation - 5 $251,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $60,000) 8 (2) Union Township, T-615, Ridge Road over 9 Trout Run, Bridge Replacement 205,000 10 (Base Construction Allocation - 11 $135,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $60,000) 14 (b) State Bridges (Reserved) 15 Section 43. Lehigh County. 16 (a) Local Bridges 17 (1) Washington Township, T-787, West Gant 18 Street over Trout Creek, Bridge 19 Replacement 175,000 20 (Base Construction Allocation - 21 $135,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $30,000) 24 (2) Lowhill Township, T-649, Narris Road 25 Bridge No.1 over Switzer Creek, Bridge 26 Replacement 145,000 27 (Base Construction Allocation - 28 $110,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $25,000) 19920S1746B2236 - 107 -
1 (3) Whitehall Township, Peach Bottom Road 2 over Spring Creek, Bridge Replacement 190,000 3 (Base Construction Allocation - 4 $135,000) 5 (Land Allocation - $25,000) 6 (Design and Contingencies - $30,000) 7 (4) Whitehall Township, Eggert Road over 8 Spring Creek, Bridge Replacement 235,000 9 (Base Construction Allocation - 10 $180,000) 11 (Land Allocation - $25,000) 12 (Design and Contingencies - $30,000) 13 (5) Whitehall Township, Overlook Lane over 14 Spring Creek, Bridge Replacement 215,000 15 (Base Construction Allocation - 16 $160,000) 17 (Land Allocation - $25,000) 18 (Design and Contingencies - $30,000) 19 (6) Whitehall Township, Columbia Street 20 over Coplay Creek, Bridge Replacement 385,000 21 (Base Construction Allocation - 22 $250,000) 23 (Land Allocation - $100,000) 24 (Design and Contingencies - $35,000) 25 (7) Lowhill Township, T-649, Narris Road 26 Bridge No.2 over Switzer Creek, Bridge 27 Replacement 170,000 28 (Base Construction Allocation - 29 $130,000) 30 (Land Allocation - $10,000) 19920S1746B2236 - 108 -
1 (Design and Contingencies - $30,000) 2 (8) Macungie Borough, Hickory Lane over 3 Tributary to Swabia Creek, Bridge 4 Replacement 160,000 5 (Base Construction Allocation - 6 $110,000) 7 (Land Allocation - $25,000) 8 (Design and Contingencies - $25,000) 9 (9) City of Allentown, Union Boulevard 10 over Lehigh River, Bridge Replacement 5,520,000 11 (Base Construction Allocation - 12 $5,000,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $500,000) 15 (10) City of Allentown, Reading Road over 16 Cedar Creek, Bridge Replacement 1,010,000 17 (Base Construction Allocation - 18 $865,000) 19 (Land Allocation - $20,000) 20 (Design and Contingencies - $125,000) 21 (11) City of Allentown, Ward Street (15th 22 Street) over Little Lehigh Creek, 23 Bridge Replacement 3,800,000 24 (Base Construction Allocation - 25 $3,400,000) 26 (Land Allocation - $20,000) 27 (Design and Contingencies - $380,000) 28 (12) City of Allentown, 15th Street Bridge 29 over Conrail and Little Lehigh Creek, 30 Bridge Rehabilitation 750,000 19920S1746B2236 - 109 -
1 (Base Construction Allocation - 2 $500,000) 3 (Land Allocation - $100,000 4 (Design and Contingencies - $150,000) 5 (13) North Whitehall Township, T-687, 6 Lehigh Street Bridge, Bridge 7 Replacement 150,000 8 (Base Construction Allocation - 9 $135,000) 10 (Design and Contingencies - $15,000) 11 (14) North Whitehall Township, T-695, 12 Walnut Street Bridge No.1, Bridge 13 Rehabilitation 83,000 14 (Base Construction Allocation - 15 $65,000) 16 (Design and Contingencies - $18,000) 17 (15) North Whitehall Township, T-695, 18 Walnut Street Bridge No.2, Bridge 19 Rehabilitation 105,000 20 (Base Construction Allocation - 21 $85,000) 22 (Design and Contingencies - $20,000) 23 (16) North Whitehall Township, T-712 24 Bridge at Overlook Road and Neffs- 25 Laurys Road, Bridge Replacement 141,000 26 (Base Construction Allocation - 27 $120,000) 28 (Design and Contingencies - $21,000) 29 (17) North Whitehall Township, T-702, 30 Bridge at Riverview Road and Neffs- 19920S1746B2236 - 110 -
1 Laurys Road, Bridge Replacement 118,000 2 (Base Construction Allocation - 3 $100,000) 4 (Design and Contingencies - $18,000) 5 (b) State Bridges 6 (1) S.R.0145 over Abandoned Conrail Line, 7 Whitehall Township, Bridge Replacement 240,000 8 (Base Construction Allocation - 9 $200,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $20,000) 12 (2) S.R.3001 over Iron Run, Lower Macungie 13 Township, Bridge Replacement 624,000 14 (Base Construction Allocation - 15 $480,000) 16 (Land Allocation - $96,000) 17 (Design and Contingencies - $48,000) 18 (3) I-78 over Iron Run, Weisenberg 19 Township, Bridge Replacement 120,000 20 (Base Construction Allocation - 21 $100,000) 22 (Design and Contingencies - $20,000) 23 (4) S.R.0378 under Easton Avenue, City of 24 Bethlehem, Bridge Replacement 812,000 25 (Base Construction Allocation - 26 $738,000) 27 (Design and Contingencies - $74,000) 28 (5) S.R.0145 over Tributary to Coplay 29 Creek, Whitehall Township, Bridge 30 Replacement 225,000 19920S1746B2236 - 111 -
1 (Base Construction Allocation - 2 $187,000) 3 (Land Allocation - $19,000) 4 (Design and Contingencies - $19,000) 5 (6) S.R.0378 under Catasaqua Road, City of 6 Bethlehem, Bridge Replacement 742,000 7 (Base Construction Allocation - 8 $674,000) 9 (Design and Contingencies - $68,000) 10 (7) S.R.1015 over S.R.0022, Whitehall 11 Township, Bridge Replacement 569,000 12 (Base Construction Allocation - 13 $517,000) 14 (Design and Contingencies - $52,000) 15 (8) S.R.2032 over Spring Creek, Upper 16 Saucon Township, Bridge Replacement 140,000 17 (Base Construction Allocation - 18 $100,000) 19 (Land Allocation - $20,000) 20 (Design and Contingencies - $20,000) 21 (9) S.R.0145 over Jordan Creek, City of 22 Allentown, Bridge Replacement 2,660,000 23 (Base Construction Allocation - 24 $2,000,000) 25 (Land Allocation - $460,000) 26 (Design and Contingencies - $200,000) 27 (10) S.R.2055 Alburtis Meyers Bridge over 28 Harrison St., Lawrence St., Little 29 Lehigh Creek and Railroad, City of 30 Allentown, Bridge Replacement 2,200,000 19920S1746B2236 - 112 -
1 (Base Construction Allocation - 2 $2,000,000) 3 (Design and Contingencies - $200,000) 4 (11) S.R.2030, Centennial Bridge over 5 Saucon Creek, Upper Saucon 6 Township, Bridge Replacement 386,000 7 (Base Construction Allocation - 8 $337,000) 9 (Land Allocation - $16,000) 10 (Design and Contingencies - $33,000) 11 (12) Tilghman Street Bridge over Lehigh 12 River, City of Allentown, Bridge 13 Rehabilitation 4,100,000 14 (Base Construction Allocation - 15 $3,550,000) 16 (Land Allocation - $100,000) 17 (Design and Contingencies - $450,000) 18 Section 44. Luzerne County. 19 (a) Local Bridges 20 (1) Nescopeck Township, T-376 Bridge over 21 Nescopeck Creek, Bridge Replacement 418,000 22 (Base Construction Allocation - 23 $324,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $84,000) 26 (2) Lehman Township, T-581 Bridge over 27 Inlet Pikes Creek Reservoir, Bridge 28 Replacement 260,000 29 (Base Construction Allocation - 30 $194,000) 19920S1746B2236 - 113 -
1 (Land Allocation - $15,000) 2 (Design and Contingencies - $51,000) 3 (3) Ross Township, County Road Bridge No.1 4 over Hunlock Creek, Bridge Replacement 269,000 5 (Base Construction Allocation - 6 $194,000) 7 (Land Allocation - $15,000 8 (Design and Contingencies - $60,000 9 (4) Kingston Township, County Road Bridge 10 No.16 over Toby's Creek, Bridge 11 Replacement 379,000 12 (Base Construction Allocation - 13 $301,000) 14 (Design and Contingencies - $78,000) 15 (5) Black Creek Township, T-309 Bridge 16 over Falls Run, Bridge Replacement 280,000 17 (Base Construction Allocation - 18 $210,000) 19 (Land Allocation - $ 15,000 20 (Design and Contingencies - $55,000) 21 (6) Jackson Township, T-704 Bridge over 22 Branch of Harveys Creek, Bridge 23 Replacement 260,000 24 (Base Construction Allocation - 25 $194,000) 26 (Land Allocation - $15,000 27 (Design and Contingencies - $51,000) 28 (7) Union Township, T-451 Bridge over 29 Shickshinny Creek, Bridge Replacement 269,000 30 (Base Construction Allocation - 19920S1746B2236 - 114 -
1 $194,000) 2 (Land Allocation - $15,000 3 (Design and Contingencies - $ 60,000) 4 (8) Sugarloaf Township, County Road Bridge 5 No.37 over Little Nescopeck Creek, 6 Bridge Replacement 368,000 7 (Base Construction Allocation - 8 $292,000) 9 (Design and Contingencies - $76,000) 10 (9) Sugarloaf Township, T-332 Bridge over 11 Nescopeck Creek, Bridge Replacement 422,000 12 (Base Construction Allocation - 13 $335,000) 14 (Design and Contingencies - $87,000) 15 (10) Hanover Township, Oxford Street over 16 Solomon's Creek, Bridge Replacement 368,000 17 (Base Construction Allocation - 18 $292,000) 19 (Design and Contingencies - $76,000) 20 (11) Fairmount Township, T-620 Bridge over 21 Phillips Creek, Bridge Replacement 277,000 22 (Base Construction Allocation - 23 $212,000) 24 (Design and Contingencies - $65,000) 25 (12) Hanover Township, East Division 26 Street over Solomon's Creek, Bridge 27 Replacement 251,000 28 (Base Construction Allocation - 29 $199,000) 30 (Design and Contingencies - $52,000) 19920S1746B2236 - 115 -
1 (13) Dorrance Township, T-404 Bridge over 2 Little Wapwallopen Creek, Bridge 3 Replacement 260,000 4 (Base Construction Allocation - 5 $194,000) 6 (Land Allocation - $ 15,000) 7 (Design and Contingencies - $51,000) 8 (14) Butler Township, County Road Bridge 9 No.41 over Nescopeck Creek, Bridge 10 Replacement 260,000 11 (Base Construction Allocation - 12 $194,000) 13 (Land Allocation - $15,000) 14 (Design and Contingencies - $51,000) 15 (15) Dorrance Township, T-387 Bridge over 16 Wapwallopen Creek, Bridge Replacement 341,000 17 (Base Construction Allocation - 18 $259,000) 19 (Land Allocation - $15,000) 20 (Design and Contingencies - $67,000) 21 (16) Dorrance Township, County Road Bridge 22 No.29 over Wapwallopen Creek, Bridge 23 Replacement 225,000 24 (Base Construction Allocation - 25 $160,000) 26 (Design and Contingencies - $65,000) 27 (17) Lehman Township, T-322 Bridge No.14 28 Maskenozha Bridge over Lake Maskenozha 29 Outlet, Bridge Replacement 210,000 30 (Base Construction Allocation - 19920S1746B2236 - 116 -
1 $165,000) 2 (Land Allocation - $20,000) 3 (Design and Contingencies - $25,000) 4 (18) Nescopeck Township, T-453 over 5 Tributary to Nescopeck Creek 6 No.044090201, Bridge Replacement 350,000 7 (Base Construction Allocation - 8 $300,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $40,000) 11 (19) Duryea Borough, Stephenson Street 12 over Lackawanna River, Bridge 13 Replacement 330,000 14 (Base Construction Allocation - 15 $300,000) 16 (Design and Contingencies - $30,000) 17 (20) Dupont Borough, Bridge on Elm Street 18 over Mill Creek, Bridge Replacement 240,000 19 (Base Construction Allocation - 20 $220,000) 21 (Design and Contingencies - $20,000) 22 (21) City of Wilkes-Barre, Govier Street 23 over Laurel Run Creek, Bridge 24 Replacement 31,000 25 (Base Construction Allocation - 26 $25,000) 27 (Design and Contingencies - $6,000) 28 (22) City of Wilkes-Barre, Sidney Street 29 over Mill Creek, Bridge Replacement 59,000 30 (Base Construction Allocation - 19920S1746B2236 - 117 -
1 $50,000) 2 (Design and Contingencies - $9,000) 3 (23) City of Wilkes-Barre, Regent Street 4 over Solomon's Creek, Bridge 5 Replacement 26,000 6 (Base Construction Allocation - 7 $20,000) 8 (Design and Contingencies - $6,000) 9 (24) City of Wilkes-Barre, Strauss Street 10 over Solomon's Creek, Bridge 11 Replacement 16,000 12 (Base Construction Allocation - 13 $12,000) 14 (Design and Contingencies - $4,000) 15 (25) City of Wilkes-Barre, Barney Street 16 over Solomon's Creek, Bridge 17 Replacement 15,000 18 (Base Construction Allocation - 19 $11,000) 20 (Design and Contingencies - $4,000) 21 (26) City of Wilkes-Barre, Franklin Street 22 over Solomon's Creek, Bridge 23 Replacement 59,000 24 (Base Construction Allocation - 25 $50,000) 26 (Design and Contingencies - $9,000) 27 (27) City of Wilkes-Barre, Walker Street 28 over Solomon's Creek, Bridge 29 Replacement 175,000 30 (Base Construction Allocation - 19920S1746B2236 - 118 -
1 $150,000) 2 (Design and Contingencies - $25,000) 3 (28) City of Wilkes-Barre, Mill Street 4 over Laurel Run Creek, Bridge 5 Replacement 175,000 6 (Base Construction Allocation - 7 $150,000) 8 (Design and Contingencies - $25,000) 9 (29) City of Wilkes-Barre, Scott Street 10 over Coal Brook, Bridge Replacement 120,000 11 (Base Construction Allocation - 12 $100,000) 13 (Design and Contingencies - $20,000) 14 (30) City of Wilkes-Barre, Waller Street 15 over Solomon's Creek No.044091245, 16 Bridge Replacement 175,000 17 (Base Construction Allocation - 18 $150,000) 19 (Design and Contingencies - $25,000) 20 (31) Butler Township, County Road Bridge 21 No.1 over Nescopeck Creek, Bridge 22 Replacement 280,000 23 (Base Construction Allocation - 24 $210,000) 25 (Land Allocation - $15,000) 26 (Design and Contingencies - $55,000) 27 (b) State Bridges 28 (1) S.R.2035 Bridge over Little Mill 29 Creek, Pittston Township, Bridge 30 Replacement 648,000 19920S1746B2236 - 119 -
1 (Base Construction Allocation - 2 $570,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $68,000) 5 (2) S.R.2035 Bridge over Meadow Run, Bear 6 Creek Township, Bridge Replacement 480,000 7 (Base Construction Allocation - 8 $420,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $50,000) 11 (3) S.R.2020 Bridge over Branch of Mill 12 Creek, Plains Township, Bridge 13 Replacement 382,000 14 (Base Construction Allocation - 15 $332,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $40,000) 18 (4) S.R.2004 Bridge over Railroad, Plains 19 Township, Bridge Replacement 1,350,000 20 (Base Construction Allocation - 21 $1,197,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $143,000) 24 (5) S.R.4016 Bridge over Hunlock Creek 25 No.044091233, Hunlock Township, Bridge 26 Replacement 1,130,000 27 (Base Construction Allocation - 28 $1,000,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $120,000) 19920S1746B2236 - 120 -
1 (6) S.R.1021 Bridge over Abraham's Creek 2 No.044091234, Kingston Township, Bridge 3 Replacement 540,000 4 (Base Construction Allocation - 5 $472,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $58,000) 8 (7) S.R.4008 Bridge over Branch of 9 Huntington Creek No.044091232, 10 Huntington Township, Bridge 11 Replacement 346,000 12 (Base Construction Allocation - 13 $300,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $36,000) 16 (8) S.R.4007 Bridge over Shickshinny Creek 17 No.044091231, Union Township, Bridge 18 Replacement 752,000 19 (Base Construction Allocation - 20 $662,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $80,000) 23 (9) S.R.1032 Bridge over Pikes Creek 24 No.0044091225, Lake Township, Bridge 25 Replacement 486,000 26 (Base Construction Allocation - 27 $425,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $51,000) 30 (10) S.R.0029 Bridge over Abandoned 19920S1746B2236 - 121 -
1 Railroad, Sugar Notch Borough, Bridge 2 Replacement 1,920,000 3 (Base Construction Allocation - 4 $1,710,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $200,000) 7 (11) S.R.0309 Bridge over Railroad and 8 Nanticoke Creek, Hanover Township, 9 Bridge Replacement 2,760,000 10 (Base Construction Allocation - 11 $2,500,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $250,000) 14 (12) S.R.0081 Bridge over Conrail 15 Railroad, Hazle Township, Bridge 16 Replacement 1,540,000 17 (Base Construction Allocation - 18 $1,370,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $160,000) 21 (13) S.R.0081 Bridge over Conrail 22 Railroad, Hazle Township, Bridge 23 Replacement 1,540,000 24 (Base Construction Allocation - 25 $1,370,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $160,000) 28 (14) S.R.1026 Bridge over Leonards Creek, 29 Dallas Township, Bridge Replacement 570,000 30 (Base Construction Allocation - 19920S1746B2236 - 122 -
1 $500,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $60,000) 4 (15) S.R.0029 Bridge over Haul Road, 5 Hanover Township, Bridge Replacement 2,925,000 6 (Base Construction Allocation - 7 $2,615,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $300,000) 10 (16) S.R.1035 Bridge over Cider Run Creek, 11 Franklin Township, Bridge Replacement 458,000 12 (Base Construction Allocation - 13 $400,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $48,000) 16 (17) S.R.3005 Bridge over Black Brook, 17 Slocum Township, Bridge Replacement 587,000 18 (Base Construction Allocation - 19 $515,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $62,000) 22 (18) S.R.2045 Bridge over Branch of 23 Wapwallopen Creek, Bridge Replacement 738,000 24 (Base Construction Allocation - 25 $650,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $78,000) 28 (19) S.R.3005 Bridge over Black Brook, 29 Slocum Township, Bridge Replacement 620,000 30 (Base Construction Allocation - 19920S1746B2236 - 123 -
1 $545,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $65,000) 4 (20) S.R.3011 Bridge over Wapwallopen 5 Creek, Hollenback Township, Bridge 6 Replacement 738,000 7 (Base Construction Allocation - 8 $650,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $78,000) 11 (21) S.R.0029 Bridge over T.R.11, Plymouth 12 Township, Bridge Replacement 470,000 13 (Base Construction Allocation - 14 $410,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $50,000) 17 (22) S.R.3020 Bridge over Branch of Black 18 Creek, Black Creek Township, Bridge 19 Replacement 540,000 20 (Base Construction Allocation - 21 $472,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $58,000) 24 (23) S.R.2035 Bridge over Little Mille 25 Creek, Pittston Township, Bridge 26 Replacement 648,000 27 (Base Construction Allocation - 28 $570,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $68,000) 19920S1746B2236 - 124 -
1 (24) S.R.0239 Bridge over Shickshinny 2 Creek, Union Township, Bridge 3 Replacement 850,000 4 (Base Construction Allocation - 5 $750,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $90,000) 8 (25) S.R.1036 Bridge over Leonards Creek, 9 Kingston Township, Bridge Replacement 775,000 10 (Base Construction Allocation - 11 $684,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $81,000) 14 (26) S.R.0404 Bridge over Little 15 Shickshinny Creek, Salem Township, 16 Bridge Replacement 822,000 17 (Base Construction Allocation - 18 $725,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $87,000) 21 (27) S.R.1036 Bridge over Toby Creek, 22 Kingston Township, Bridge Replacement 640,000 23 (Base Construction Allocation - 24 $563,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $67,000) 27 (28) S.R.1013 Bridge over Toby Creek, 28 Luzerne Borough, Bridge Replacement 1,218,000 29 (Base Construction Allocation - 30 $1,078,000) 19920S1746B2236 - 125 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $130,000) 3 (29) S.R.1032 Bridge over Branch of Bear 4 Hollow Creek, Lake Township, Bridge 5 Replacement 503,000 6 (Base Construction Allocation - 7 $440,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $53,000) 10 (30) S.R.2008 Bridge over Nanticoke Creek, 11 Hanover Township, Bridge Replacement 628,000 12 (Base Construction Allocation - 13 $552,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $66,000) 16 (31) S.R.2005 Bridge over Bowman Spring 17 Run, City of Wilkes-Barre, Bridge 18 Replacement 510,000 19 (Base Construction Allocation - 20 $447,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $53,000) 23 (32) S.R.2015 Bridge over Gardner Creek, 24 Laflin Borough, Bridge Replacement 592,000 25 (Base Construction Allocation - 26 $520,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $62,000) 29 (33) S.R.2017 Bridge over S.R.3031, 30 Jenkins Township, Bridge Replacement 1,156,000 19920S1746B2236 - 126 -
1 (Base Construction Allocation - 2 $1,034,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $112,000) 5 (34) S.R.2020 Bridge over Branch of Mill 6 Creek, Plains Township, Bridge 7 Replacement 382,000 8 (Base Construction Allocation - 9 $332,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $40,000) 12 (35) S.R.2020 Bridge over Mill Creek, 13 Plains Township, Bridge Replacement 727,000 14 (Base Construction Allocation - 15 $640,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $77,000) 18 (36) S.R.2026 Bridge over Gardners Creek, 19 Laflin Borough, Bridge Replacement 772,000 20 (Base Construction Allocation - 21 $680,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $82,000) 24 (37) S.R.0118 Bridge over Branch of 25 Harveys Creek, Lehman Township, Bridge 26 Replacement 604,000 27 (Base Construction Allocation - 28 $530,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $64,000) 19920S1746B2236 - 127 -
1 (38) S.R.1010 Bridge over Abrahams Creek, 2 West Wyoming Borough, Bridge 3 Replacement 1,230,000 4 (Base Construction Allocation - 5 $1,087,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $133,000) 8 (39) S.R.2002 Bridge over Solomon's Creek, 9 Hanover Township, Bridge Replacement 1,475,000 10 (Base Construction Allocation - 11 $1,308,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $157,000) 14 (40) S.R.2029 Bridge over Mill Creek, 15 Avoca Borough, Bridge Replacement 984,000 16 (Base Construction Allocation - 17 $870,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $104,000) 20 (41) S.R.2035 Bridge over Branch of Meadow 21 Run, Bear Creek Township, Bridge 22 Replacement 525,000 23 (Base Construction Allocation - 24 $460,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $55,000) 27 (42) S.R.2035 Bridge over Bear Creek, Bear 28 Creek Township, Bridge Replacement 452,000 29 (Base Construction Allocation - 30 $395,000) 19920S1746B2236 - 128 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $37,000) 3 (43) S.R. 2020 Bridge over Mill Creek, 4 Plains Township, Bridge Replacement 727,000 5 (Base Construction Allocation - 6 $640,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $77,000) 9 (44) S.R.2017 Bridge over S.R.2021, 10 Jenkins Township, Bridge Replacement 1,156,000 11 (Base Construction Allocation - 12 $1,034,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $112,000) 15 (45) S.R.2021 Culvert Segment 0020, Offset 16 2190, Pittston Township, Bridge 17 Replacement 300,000 18 (Base Construction Allocation - 19 $260,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $30,000) 22 (46) S.R.2024 Culvert Segment 0110, Offset 23 0000 PI No.044092201, Jenkins Township, 24 Bridge Replacement 200,000 25 (Base Construction Allocation - 26 $170,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $20,000) 29 Section 45. Lycoming County. 30 (a) Local Bridges 19920S1746B2236 - 129 -
1 (1) Armstrong Township, T-329 over 2 Mosquito Creek, Bridge Replacement 427,000 3 (Base Construction Allocation - 4 $342,000) 5 (Land Allocation - $21,000) 6 (Design and Contingencies - $64,000) 7 (2) Armstrong Township, T-434 over 8 Mosquito Creek, Bridge Replacement 541,000 9 (Base Construction Allocation - 10 $433,000) 11 (Land Allocation - $27,000) 12 (Design and Contingencies - $81,000) 13 (3) Brown Township, T-762 over Jacobs Run, 14 Bridge Replacement 411,000 15 (Base Construction Allocation - 16 $329,000) 17 (Land Allocation - $21,000) 18 (Design and Contingencies - $61,000) 19 (4) Cascade Township, T-665 over Potash 20 Hollow Creek, Bridge Replacement 214,000 21 (Base Construction Allocation - 22 $171,000) 23 (Land Allocation - $11,000) 24 (Design and Contingencies - $32,000) 25 (5) Franklin Township, T-710 over Beaver 26 Run, Bridge Replacement 265,000 27 (Base Construction Allocation - 28 $212,000) 29 (Land Allocation - $13,000) 30 (Design and Contingencies - $40,000) 19920S1746B2236 - 130 -
1 (6) Hepburn Township, T-510 over Mill 2 Creek, Bridge Replacement 303,000 3 (Base Construction Allocation - 4 $257,000) 5 (Design and Contingencies - $46,000) 6 (7) Jordan Township, T-740 over Muncy 7 Creek, Northeast of Lairdsville, Bridge 8 Replacement 321,000 9 (Base Construction Allocation - 10 $269,000) 11 (Land Allocation - $29,000) 12 (Design and Contingencies - $23,000) 13 (8) Lewis Township, T-856 over Pleasant 14 Stream, Bridge Replacement 424,000 15 (Base Construction Allocation - 16 $302,000) 17 (Land Allocation - $19,000) 18 (Design and Contingencies - $103,000) 19 (9) Lewis Township, T-629 over Slacks Run, 20 Bridge Replacement 356,000 21 (Base Construction Allocation - 22 $285,000) 23 (Land Allocation - $18,000) 24 (Design and Contingencies - $53,000) 25 (10) Lewis Township, T-836 over Trout Run, 26 Bridge Replacement 321,000 27 (Base Construction Allocation - 28 $257,000) 29 (Land Allocation - $16,000) 30 (Design and Contingencies - $48,000) 19920S1746B2236 - 131 -
1 (11) Moreland Township, T-664 over German 2 Run, Bridge Replacement 300,000 3 (Base Construction Allocation - 4 $240,000) 5 (Land Allocation - $15,000) 6 (Design and Contingencies - $45,000) 7 (12) Moreland Township, T-668, Kramer Hill 8 Road over Sugar Run, Bridge 9 Replacement 245,000 10 (Base Construction Allocation - 11 $196,000) 12 (Land Allocation - $12,000) 13 (Design and Contingencies - $37,000) 14 (13) Moreland Township, T-447 over Laurel 15 Run No.1, Bridge Replacement 311,000 16 (Base Construction Allocation - 17 $264,000) 18 (Land Allocation - $15,000) 19 (Design and Contingencies - $32,000) 20 (14) Moreland Township, T-638 over Laurel 21 Run, Bridge Replacement 285,000 22 (Base Construction Allocation - 23 $228,000) 24 (Land Allocation - $14,000) 25 (Design and Contingencies - $43,000) 26 (15) Penn Township, T-654 over Greggs Run, 27 Bridge Replacement 225,000 28 (Base Construction Allocation - 29 $180,000) 30 (Land Allocation - $11,000) 19920S1746B2236 - 132 -
1 (Design and Contingencies - $34,000) 2 (16) Penn/Franklin Township, T-706 over 3 Beaver Run, Bridge Replacement 272,000 4 (Base Construction Allocation - 5 $217,000) 6 (Land Allocation - $14,000) 7 (Design and Contingencies - $41,000) 8 (17) Pine Township, T-776 over English Run 9 No.2, Bridge Replacement 325,000 10 (Base Construction Allocation - 11 $260,000) 12 (Land Allocation - $16,000) 13 (Design and Contingencies - $49,000) 14 (18) Pine Township, T-782 over Rock Run, 15 Bridge Replacement 225,000 16 (Base Construction Allocation - 17 $180,000) 18 (Land Allocation - $11,000) 19 (Design and Contingencies - $34,000) 20 (19) Pine Township, T-782 over Texas Creek 21 No.1, Bridge Replacement 484,000 22 (Base Construction Allocation - 23 $387,000) 24 (Land Allocation - $24,000) 25 (Design and Contingencies - $73,000) 26 (20) Shrewsbury Township, T-658 over Big 27 Run, Bridge Replacement 250,000 28 (Base Construction Allocation - 29 $210,000) 30 (Land Allocation - $10,000) 19920S1746B2236 - 133 -
1 (Design and Contingencies - $30,000) 2 (21) Shrewsbury Township, T-686 over Rock 3 Run No.1, Bridge Replacement 305,000 4 (Base Construction Allocation - 5 $244,000) 6 (Land Allocation - $15,000) 7 (Design and Contingencies - $46,000) 8 (22) Shrewsbury Township, T-686 over Rock 9 Run No.2, Bridge Replacement 262,000 10 (Base Construction Allocation - 11 $202,000) 12 (Land Allocation - $13,000) 13 (Design and Contingencies - $47,000) 14 (23) Washington Township, T-397 over White 15 Deer Hole Creek, Bridge Replacement 204,000 16 (Base Construction Allocation - 17 $170,000) 18 (Land Allocation - $19,000) 19 (Design and Contingencies - $15,000) 20 (24) Wolf Township, T-250 over Greggs Run, 21 Bridge Replacement 290,000 22 (Base Construction Allocation - 23 $245,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $35,000) 26 (25) Loyalsock Township, Miller Street 27 between Williamsport City Line and 28 Warren Avenue, Bridge Replacement 250,000 29 (Base Construction Allocation - 30 $200,000) 19920S1746B2236 - 134 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $30,000) 3 (b) State Bridges 4 (1) S.R.3018, T-842, First Forks Road 5 Bridge over First Fork Larrys Creek, 6 Mifflin Township, Bridge Replacement 425,000 7 (Base Construction Allocation - 8 $340,000) 9 (Land Allocation - $64,000) 10 (Design and Contingencies - $21,000) 11 Section 46. McKean County. 12 (a) Local Bridges (Reserved) 13 (b) State Bridges 14 (1) S.R.0046, Haven Brook Bridge over 15 Havens Brook, Norwich Township, Bridge 16 Replacement 700,000 17 (Base Construction Allocation - 18 $500,000) 19 (Land Allocation - $100,000) 20 (Design and Contingencies - $100,000) 21 (2) S.R.0770, Sheppard Run Bridge over 22 Sheppard Run, Bradford Township, Bridge 23 Replacement 725,000 24 (Base Construction Allocation - 25 $525,000) 26 (Land Allocation - $100,000) 27 (Design and Contingencies - $100,000) 28 (3) S.R.0046 Bridge over Havens Brook, 29 Norwich Township, Bridge Replacement 700,000 30 (Base Construction Allocation - 19920S1746B2236 - 135 -
1 $500,000) 2 (Land Allocation - $100,000) 3 (Design and Contingencies - $100,000) 4 (4) S.R.0770 Bridge over Sheppard Run, 5 Bradford Township, Bridge Replacement 725,000 6 (Base Construction Allocation - 7 $525,000) 8 (Land Allocation - $100,000) 9 (Design and Contingencies - $100,000) 10 (5) S.R.0006 Bridge over Allegheny River, 11 Port Allegheny Borough, Bridge 12 Replacement 4,050,000 13 (Base Construction Allocation - 14 $3,600,000) 15 (Land Allocation - $150,000) 16 (Design and Contingencies - $300,000) 17 (6) S.R.0006 Bridge over Conrail, Port 18 Allegheny Borough, Bridge Replacement 1,850,000 19 (Base Construction Allocation - 20 $1,500,000) 21 (Land Allocation - $150,000) 22 (Design and Contingencies - $200,000) 23 (7) S.R.0155 Bridge over Allegheny River, 24 Port Allegheny Borough, Bridge 25 Replacement 2,550,000 26 (Base Construction Allocation - 27 $2,150,000) 28 (Land Allocation - $150,000) 29 (Design and Contingencies - $250,000) 30 (8) S.R.0155 Bridge over Rock Run, Annin 19920S1746B2236 - 136 -
1 Township, Bridge Replacement 650,000 2 (Base Construction Allocation - 3 $450,000) 4 (Land Allocation - $100,000) 5 (Design and Contingencies - $100,000) 6 (9) S.R.0219, Bradford Bypass Bridge over 7 S.R.0346 and S.R.4013, Foster Township, 8 Bridge Replacement 250,000 9 (Base Construction Allocation - 10 $200,000) 11 (Design and Contingencies - $50,000) 12 (10) S.R.3006 Bridge over Kinzua Creek, 13 Lafayette Township, Bridge Replacement 1,250,000 14 (Base Construction Allocation - 15 $950,000) 16 (Land Allocation - $150,000) 17 (Design and Contingencies - $150,000) 18 (11) S.R.4004, Tunungawant Creek Bridge 19 No.1 over West Branch of Tunungawant 20 Creek, Bradford Township, Bridge 21 Replacement 1,250,000 22 (Base Construction Allocation - 23 $1,000,000) 24 (Land Allocation - $100,000) 25 (Design and Contingencies - $150,000) 26 Section 47. Mercer County. 27 (a) Local Bridges 28 (1) Bridge No.43710104232323, Bridge 29 Replacement 315,000 30 (Base Construction Allocation - 19920S1746B2236 - 137 -
1 $280,000) 2 (Land Allocation - $5,000) 3 (Design and Contingencies - $30,000) 4 (2) Fairview Township, McCartney Road, 5 Bridge Replacement 208,000 6 (Base Construction Allocation - 7 $180,000) 8 (Land Allocation - $5,000) 9 (Design and Contingencies - $23,000) 10 (3) Findley Township, Cribbs Road, Bridge 11 Replacement 230,000 12 (Base Construction Allocation - 13 $200,000) 14 (Land Allocation - $5,000) 15 (Design and Contingencies - $25,000) 16 (4) Coalspring Township, McEwen Road, 17 Bridge Replacement 208,000 18 (Base Construction Allocation - 19 $180,000) 20 (Land Allocation - $5,000) 21 (Design and Contingencies - $23,000) 22 (5) Hermitage Borough, Kelly Road, Bridge 23 Replacement 851,000 24 (Base Construction Allocation - 25 $784,000) 26 (Land Allocation - $7,000) 27 (Design and Contingencies - $60,000) 28 (6) Hempfield Township, Blahert Road, 29 Bridge Replacement 220,000 30 (Base Construction Allocation - 19920S1746B2236 - 138 -
1 $190,000) 2 (Land Allocation - $5,000) 3 (Design and Contingencies - $25,000) 4 (7) Perry Township, Pierson Road, Bridge 5 Replacement 647,000 6 (Base Construction Allocation - 7 $558,000) 8 (Land Allocation - $5,000) 9 (Design and Contingencies - $84,000) 10 (8) Jefferson Township, Fullingmill Road, 11 Bridge Replacement 230,000 12 (Base Construction Allocation - 13 $200,000) 14 (Land Allocation - $5,000) 15 (Design and Contingencies - $25,000) 16 (9) Hermitage Borough, Kelley Road, Bridge 17 Replacement 1,020,000 18 (Base Construction Allocation - 19 $941,000) 20 (Land Allocation - $7,000) 21 (Design and Contingencies - $72,000) 22 (10) Lake Township, Cannon Road, Bridge 23 Replacement 414,000 24 (Base Construction Allocation - 25 $335,000) 26 (Land Allocation - $5,000) 27 (Design and Contingencies - $74,000) 28 (11) Grove City, East Pine Street, Bridge 29 Replacement 867,000 30 (Base Construction Allocation - 19920S1746B2236 - 139 -
1 $794,000) 2 (Land Allocation - $5,000) 3 (Design and Contingencies - $68,000) 4 (12) City of Sharon, Oakland Avenue, 5 Bridge Replacement 3,757,000 6 (Base Construction Allocation - 7 $3,180,000) 8 (Land Allocation - $100,000) 9 (Design and Contingencies - $477,000) 10 (13) French Creek Township, Lower Road, 11 Bridge Replacement 398,000 12 (Base Construction Allocation - 13 $320,000) 14 (Land Allocation - $5,000) 15 (Design and Contingencies - $73,000) 16 (14) Wolf Creek Township, Jack Road, 17 Bridge Replacement 320,000 18 (Base Construction Allocation - 19 $274,000) 20 (Land Allocation - $5,000) 21 (Design and Contingencies - $41,000) 22 (15) Sandy Lake, Walnut Street, Bridge 23 Replacement 230,000 24 (Base Construction Allocation - 25 $200,000) 26 (Land Allocation - $5,000) 27 (Design and Contingencies - $25,000) 28 (16) Perry Township, Mill Road, Bridge 29 Replacement 593,000 30 (Base Construction Allocation - 19920S1746B2236 - 140 -
1 $511,000) 2 (Land Allocation - $5,000) 3 (Design and Contingencies - $77,000) 4 (17) New Vernon Township, Betty Boyde 5 Road, Bridge Replacement 208,000 6 (Base Construction Allocation - 7 $180,000) 8 (Land Allocation - $5,000) 9 (Design and Contingencies - $23,000) 10 (18) Fairview Township, Genger Road, 11 Bridge Replacement 208,000 12 (Base Construction Allocation - 13 $180,000) 14 (Land Allocation - $5,000) 15 (Design and Contingencies - $23,000) 16 (19) Lake Township, Steckler Road, Bridge 17 Replacement 230,000 18 (Base Construction Allocation - 19 $200,000) 20 (Land Allocation - $5,000) 21 (Design and Contingencies - $25,000) 22 (20) Shenango Township, Riggs Road, Bridge 23 Replacement 252,000 24 (Base Construction Allocation - 25 $220,000) 26 (Land Allocation - $5,000) 27 (Design and Contingencies - $27,000) 28 (21) Wolf Creek Township, Gill Road, 29 Bridge Replacement 230,000 30 (Base Construction Allocation - 19920S1746B2236 - 141 -
1 $200,000) 2 (Land Allocation - $5,000) 3 (Design and Contingencies - $25,000) 4 (22) Greenville, Race Street, Bridge 5 Replacement 778,000 6 (Base Construction Allocation - 7 $672,000) 8 (Land Allocation - $5,000) 9 (Design and Contingencies - $101,000) 10 (23) Sugar Grove Township, Gardner Hill 11 Road, Bridge Replacement 230,000 12 (Base Construction Allocation - 13 $200,000) 14 (Land Allocation - $5,000) 15 (Design and Contingencies - $25,000) 16 (24) Findley Township, Uber Road, Bridge 17 Replacement 208,000 18 (Base Construction Allocation - 19 $180,000) 20 (Land Allocation - $5,000) 21 (Design and Contingencies - $23,000) 22 (25) Mill Creek Township, Deemers Road, 23 Bridge Replacement 285,000 24 (Base Construction Allocation - 25 $250,000) 26 (Land Allocation - $5,000) 27 (Design and Contingencies - $30,000) 28 (26) Wolf Creek Township, Gilmore Road, 29 Bridge Replacement 208,000 30 (Base Construction Allocation - 19920S1746B2236 - 142 -
1 $180,000) 2 (Land Allocation - $5,000) 3 (Design and Contingencies - $23,000) 4 (27) Grove City, Chestnut Street, Bridge 5 Replacement 2,871,000 6 (Base Construction Allocation - 7 $2,666,000) 8 (Land Allocation - $5,000) 9 (Design and Contingencies - $200,000) 10 (28) Sandy Creek Township, County Line 11 Road, Bridge Replacement 297,000 12 (Base Construction Allocation - 13 $254,000) 14 (Land Allocation - $5,000) 15 (Design and Contingencies - $38,000) 16 (29) Lake Township, Farm Road, Bridge 17 Replacement 208,000 18 (Base Construction Allocation - 19 $180,000) 20 (Land Allocation - $5,000) 21 (Design and Contingencies - $23,000) 22 (30) West Middlesex, Cemetary Road, Bridge 23 Replacement 297,000 24 (Base Construction Allocation - 25 $254,000) 26 (Land Allocation - $5,000) 27 (Design and Contingencies - $38,000) 28 (31) Jefferson Township, Clay Furnace 29 Road, Bridge Replacement 208,000 30 (Base Construction Allocation - 19920S1746B2236 - 143 -
1 $180,000) 2 (Land Allocation - $5,000) 3 (Design and Contingencies - $23,000) 4 (32) Jackson Township, Fox Mine Road, 5 Bridge Replacement 230,000 6 (Base Construction Allocation - 7 $200,000) 8 (Land Allocation - $5,000) 9 (Design and Contingencies - $25,000) 10 (33) City of Hermitage, T-388, Kelly Road 11 Bridge No.1 over Shenango River, Bridge 12 Replacement 851,000 13 (Base Construction Allocation - 14 $784,000) 15 (Land Allocation - $7,000) 16 (Design and Contingencies - $60,000) 17 (b) State Bridges 18 (1) S.R.0062 over Shenango River, Bridge 19 Replacement 1,550,000 20 (Base Construction Allocation - 21 $1,400,000) 22 (Land Allocation - $50,000) 23 (Design and Contingencies - $100,000) 24 (2) S.R.0062 over South Dock Valley Way, 25 Bridge Replacement 1,850,000 26 (Base Construction Allocation - 27 $1,700,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $100,000) 30 (3) S.R.0062 over Conrail Railroad, Bridge 19920S1746B2236 - 144 -
1 Replacement 1,750,000 2 (Base Construction Allocation - 3 $1,600,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $100,000) 6 (4) S.R.0058 on Kinsman Road over Sugar 7 Run, Greene Township, Bridge 8 Replacement 300,000 9 (Base Construction Allocation - 10 $255,000) 11 (Land Allocation - $15,000) 12 (Design and Contingencies - $30,000) 13 (5) S.R.3022 on Rutledge Road over 14 Lackawannock Creek, Jefferson Township, 15 Bridge Replacement 300,000 16 (Base Construction Allocation - 17 $255,000) 18 (Land Allocation - $15,000) 19 (Design and Contingencies - $30,000) 20 (6) S.R.0318 on West Middlesex-Mercer Road 21 over Little Neshannock Creek, East 22 Lackawannock Township, Bridge 23 Replacement 430,000 24 (Base Construction Allocation - 25 $365,000) 26 (Land Allocation - $20,000) 27 (Design and Contingencies - $45,000) 28 (7) S.R.3013 on Orchard Road over 29 Interstate 80, BMS 4330130070000, 30 Lackawannock Township, Bridge 19920S1746B2236 - 145 -
1 Rehabilitation 900,000 2 (Base Construction Allocation - 3 $765,000) 4 (Land Allocation - $45,000) 5 (Design and Contingencies - $90,000) 6 (8) S.R.0019 on Perry Highway over 7 Tributary of Little Shenango River, 8 Perry Township, Bridge Replacement 210,000 9 (Base Construction Allocation - 10 $180,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $20,000) 13 (9) S.R.0718 on State Street over Shenango 14 River, City of Sharon, Bridge 15 Rehabilitation 800,000 16 (Base Construction Allocation - 17 $680,000) 18 (Land Allocation - $40,000) 19 (Design and Contingencies - $80,000) 20 Section 48. Mifflin County. 21 (a) Local Bridges (Reserved) 22 (b) State Bridges 23 (1) S.R.3021, Newton Hamilton Bridge over 24 Juniata River, Newton Hamilton Borough, 25 Bridge Replacement 5,250,000 26 (Base Construction Allocation - 27 $4,750,000) 28 (Land Allocation - $200,000) 29 (Design and Contingencies - $300,000) 30 (2) S.R.0522 Bridge over Branch of Jacks 19920S1746B2236 - 146 -
1 Creek, Decatur Township, Bridge 2 Replacement 600,000 3 (Base Construction Allocation - 4 $400,000) 5 (Land Allocation - $100,000) 6 (Design and Contingencies - $100,000) 7 (3) S.R.2007 Bridge over Kishacoquillas 8 Creek, Derry Township, Bridge 9 Replacement 925,000 10 (Base Construction Allocation - 11 $700,000) 12 (Land Allocation - $100,000) 13 (Design and Contingencies - $125,000) 14 Section 49. Monroe County. 15 (a) Local Bridges 16 (1) Tunkhannock Township, T-629, over 17 Tunkhannock Creek, Bridge Replacement 190,000 18 (Base Construction Allocation - 19 $140,000) 20 (Land Allocation - $20,000) 21 (Design and Contingencies - $30,000) 22 (2) Tunkhannock Township, T-633, Bridge 23 over Tunkhannock Creek, Bridge 24 Replacement 139,000 25 (Base Construction Allocation - 26 $121,000) 27 (Land Allocation - $6,000) 28 (Design and Contingencies - $12,000) 29 (3) Stroud Township, T-410 Bridge over 30 Cherry Creek, Bridge Replacement 127,000 19920S1746B2236 - 147 -
1 (Base Construction Allocation - 2 $110,000) 3 (Land Allocation - $6,000) 4 (Design and Contingencies - $11,000) 5 (4) Hamilton Township, T-202, Lake Circle 6 Bridge, Bridge Replacement 126,000 7 (Base Construction Allocation - 8 $101,000) 9 (Land Allocation - $5,000) 10 (Design and Contingencies - $20,000) 11 (5) Hamilton Township, T-414, Bridge No.7, 12 Bridge Replacement 522,000 13 (Base Construction Allocation - 14 $457,000) 15 (Land Allocation - $20,000) 16 (Design and Contingencies - $45,000) 17 (6) Jackson Township, T-486, Trout Lake 18 Bridge, Bridge Replacement 184,000 19 (Base Construction Allocation - 20 $160,000) 21 (Land Allocation - $8,000) 22 (Design and Contingencies - $16,000) 23 (7) Stroud Township, T-420, Bridge over 24 Cherry Creek, Bridge Replacement 169,000 25 (Base Construction Allocation - 26 $143,000) 27 (Land Allocation - $6,000) 28 (Design and Contingencies - $20,000) 29 (8) Smithfield Township, T-539, Bridge 30 over Marshalls Creek, Bridge 19920S1746B2236 - 148 -
1 Replacement 298,000 2 (Base Construction Allocation - 3 $267,000) 4 (Land Allocation - $5,000) 5 (Design and Contingencies - $26,000) 6 (b) State Bridges 7 (1) S.R.0402 at Ressica Falls, Middle 8 Smithfield Township, Bridge 9 Replacement 1,426,000 10 (Base Construction Allocation - 11 $1,060,000) 12 (Land Allocation - $60,000) 13 (Design and Contingencies - $306,000) 14 (2) S.R.0033 over S.R.0209, Hamilton 15 Township, Bridge Replacement 195,000 16 (Base Construction Allocation - 17 $177,000) 18 (Design and Contingencies - $18,000) 19 (3) S.R.2012 Hamilton East Road over 20 McMichael Creek, Hamilton Township, 21 Bridge Replacement 140,000 22 (Base Construction Allocation - 23 $100,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $20,000) 26 (4) S.R.2004 over S.R.0033, Hamilton 27 Township, Bridge Replacement 335,000 28 (Base Construction Allocation - 29 $304,000) 30 (Design and Contingencies - $31,000) 19920S1746B2236 - 149 -
1 (5) S.R.2003 over Cherry Creek, Hamilton 2 Township, Bridge Replacement 137,000 3 (Base Construction Allocation - 4 $79,000) 5 (Land Allocation - $5,000) 6 (Design and Contingencies - $53,000) 7 (6) S.R.3018 over Kettle Creek II, 8 Hamilton Township, Bridge Replacement 68,000 9 (Base Construction Allocation - 10 $59,000) 11 (Land Allocation - $3,000) 12 (Design and Contingencies - $6,000) 13 (7) S.R.3018 over Kettle Creek I, Hamilton 14 Township, Bridge Replacement 80,000 15 (Base Construction Allocation - 16 $70,000) 17 (Land Allocation - $3,000) 18 (Design and Contingencies - $7,000) 19 (8) S.R.2017 over I-80, East Stroudsburg 20 Borough, Bridge Replacement 381,000 21 (Base Construction Allocation - 22 $317,000) 23 (Design and Contingencies - $64,000) 24 (9) S.R.0080 Water Gap Bridge over Cherry 25 Creek, Delaware Water Gap, Bridge 26 Replacement 795,000 27 (Base Construction Allocation - 28 $723,000) 29 (Design and Contingencies - $72,000) 30 (10) S.R.0447 at Leavetts Branch, Barrett 19920S1746B2236 - 150 -
1 Township, Bridge Replacement 255,000 2 (Base Construction Allocation - 3 $175,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $70,000) 6 (11) S.R.0611 at Erie/Lackawanna Railroad, 7 Coolbaugh Township, Bridge Replacement 608,000 8 (Base Construction Allocation - 9 $521,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $77,000) 12 (12) S.R.0423 over Tobyhanna Creek, 13 Coolbaugh Township, Bridge Replacement 194,000 14 (Base Construction Allocation - 15 $163,000) 16 (Design and Contingencies - $31,000) 17 (13) S.R.2030 over I-80, Delaware Water 18 Gap, Bridge Replacement 450,000 19 (Base Construction Allocation - 20 $409,000) 21 (Design and Contingencies - $41,000) 22 (14) S.R.1014 over Wallenpaupack Creek, 23 Coolbaugh Township, Bridge Replacement 140,000 24 (Base Construction Allocation - 25 $100,000) 26 (Land Allocation - $20,000) 27 (Design and Contingencies - $20,000) 28 (15) S.R.4007 over Steamtown Railroad, 29 Mount Pocono Borough, Bridge 30 Replacement 820,000 19920S1746B2236 - 151 -
1 (Base Construction Allocation - 2 $700,000) 3 (Land Allocation - $50,000) 4 (Design and Contingencies - $70,000) 5 (16) S.R.3022 over McMichaels Creek, 6 Hamilton Township, Bridge Replacement 161,000 7 (Base Construction Allocation - 8 $140,000) 9 (Land Allocation - $7,000) 10 (Design and Contingencies - $14,000) 11 (17) S.R.4001 at Long Pond, Tunkhannock 12 Township, Bridge Replacement 425,000 13 (Base Construction Allocation - 14 $300,000) 15 (Land Allocation - $50,000) 16 (Design and Contingencies - $75,000) 17 (18) S.R.0940 at Pocono Summit, Tobyhanna 18 Township, Bridge Replacement 4,850,000 19 (Base Construction Allocation - 20 $4,600,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $200,000) 23 (19) S.R.0940 over Tobyhanna Creek, 24 Tobyhanna Township, Bridge Replacement 1,240,000 25 (Base Construction Allocation - 26 $1,100,000) 27 (Land Allocation - $60,000) 28 (Design and Contingencies - $80,000) 29 (20) S.R.0191 over McMichaels Creek, 30 Stroudsburg Borough, Bridge 19920S1746B2236 - 152 -
1 Replacement 520,000 2 (Base Construction Allocation - 3 $472,000) 4 (Design and Contingencies - $48,000) 5 (21) S.R.0191 under Railroad, Pocono 6 Township, Bridge Replacement 1,400,000 7 (Base Construction Allocation - 8 $1,000,000) 9 (Land Allocation - $200,000) 10 (Design and Contingencies - $200,000) 11 (22) S.R.0209 over I-80, Smithfield 12 Township, Bridge Replacement 368,000 13 (Base Construction Allocation - 14 $334,000) 15 (Design and Contingencies - $34,000) 16 (23) S.R.8024 at I-80 Ramp, Smithfield 17 Township, Bridge Replacement 759,000 18 (Base Construction Allocation - 19 $690,000) 20 (Design and Contingencies - $69,000) 21 (24) S.R.1005 over Buffalo Run, Stroud 22 Township, Bridge Replacement 103,000 23 (Base Construction Allocation - 24 $90,000) 25 (Land Allocation - $4,000) 26 (Design and Contingencies - $9,000) 27 (25) S.R.0191 over Broadhead Creek, Stroud 28 Township, Bridge Replacement 843,000 29 (Base Construction Allocation - 30 $648,000) 19920S1746B2236 - 153 -
1 (Land Allocation - $65,000) 2 (Design and Contingencies - $130,000) 3 (26) S.R.3022 over McMichael Creek, 4 Hamilton Township, Bridge Replacement 161,000 5 (Base Construction Allocation - 6 $140,000) 7 (Land Allocation - $7,000) 8 (Design and Contingencies - $14,000) 9 Section 50. Montgomery County. 10 (a) Local Bridges 11 (1) Cheltenham Township, Mill Road Bridge 12 over Tookany Creek between Church Road 13 and Harrison Avenue, Elkins Park, 14 Bridge Replacement 360,000 15 (Base Construction Allocation - 16 $300,000) 17 (Land Allocation - $15,000) 18 (Design and Contingencies - $45,000) 19 (2) Cheltenham Township, Forest Avenue 20 Bridge over Tookany Creek at the 21 Intersection of Forest Avenue and 22 Shoemaker Road, Elkins Park, Bridge 23 Replacement 285,000 24 (Base Construction Allocation - 25 $250,000) 26 (Design and Contingencies - $35,000) 27 (3) Cheltenham Township, Serpentine Lane 28 Bridge over Rock Lane Creek between 29 Rock Lane and Ivy Lane, Elkins Park, 30 Bridge Replacement 230,000 19920S1746B2236 - 154 -
1 (Base Construction Allocation - 2 $200,000) 3 (Design and Contingencies - $30,000) 4 (4) Cheltenham Township, Tookany Creek 5 Parkway Bridge over Tookany Creek 500 6 feet East of New Second Street, Elkins 7 Park, Bridge Replacement 345,000 8 (Base Construction Allocation - 9 $300,000) 10 (Design and Contingencies - $45,000) 11 (5) Cheltenham Township, Ashmead Road 12 Bridge over Tookany Creek 100 feet 13 South of Tookany Creek Parkway, 14 Cheltenham, Bridge Replacement 400,000 15 (Base Construction Allocation - 16 $350,000) 17 (Design and Contingencies - $50,000) 18 (6) Trappe Borough and Perkiomen Township, 19 Betcher Road Bridge over Branch of 20 School House Run, Bridge Replacement 73,000 21 (Base Construction Allocation - 22 $66,000) 23 (Design and Contingencies - $7,000) 24 (7) Trappe Borough, West First Avenue 25 Bridge over Donny Brook Creek, Bridge 26 Replacement 49,000 27 (Base Construction Allocation - 28 $44,000) 29 (Design and Contingencies - $5,000) 30 (8) Abington Township, Revelation Road, 19920S1746B2236 - 155 -
1 Bridge Replacement 600,000 2 (Base Construction Allocation - 3 $400,000) 4 (Land Allocation - $100,000) 5 (Design and Contingencies - $100,000) 6 (9) Abington Township, Osceola Avenue, 7 Bridge Replacement 300,000 8 (Base Construction Allocation - 9 $200,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $50,000) 12 (10) Abington Township, Cadwalader Avenue, 13 Bridge Replacement 300,000 14 (Base Construction Allocation - 15 $200,000) 16 (Land Allocation - $50,000) 17 (Design and Contingencies - $50,000) 18 (11) Abington Township, Tulpehocken 19 Avenue, Bridge Replacement 300,000 20 (Base Construction Allocation - 21 $200,000) 22 (Land Allocation - $50,000) 23 (Design and Contingencies - $50,000) 24 (12) Abington Township, Rydal Road at 25 Cloverly Lane, Bridge Replacement 300,000 26 (Base Construction Allocation - 27 $200,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $50,000) 30 (13) Abington Township, Meadowbrook Road 19920S1746B2236 - 156 -
1 between Stocton Road and Valley Road, 2 Bridge Replacement 425,000 3 (Base Construction Allocation - 4 $300,000) 5 (Land Allocation - $50,000) 6 (Design and Contingencies - $75,000) 7 (14) Abington Township, Stocton Road at 8 Meadowbrook Road, Bridge Replacement 350,000 9 (Base Construction Allocation - 10 $250,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $50,000) 13 (15) Abington Township, Paul Brook Lane, 14 Bridge Replacement 350,000 15 (Base Construction Allocation - 16 $250,000) 17 (Land Allocation - $50,000) 18 (Design and Contingencies - $50,000) 19 (16) Abington Township, Johnston Avenue at 20 Radcliffe Avenue, Bridge Replacement 550,000 21 (Base Construction Allocation - 22 $400,000) 23 (Land Allocation - $50,000) 24 (Design and Contingencies - $100,000) 25 (17) Abington Township, Washington Lane, 26 300 feet South of Frog Hollow Road, 27 Bridge Replacement 2,700,000 28 (Base Construction Allocation - 29 $2,000,000) 30 (Land Allocation - $200,000) 19920S1746B2236 - 157 -
1 (Design and Contingencies - $500,000) 2 (18) Abington Township, L.R.46115, Station 3 50-98, North Hills Avenue, Bridge 4 Replacement 340,000 5 (Base Construction Allocation - 6 $200,000) 7 (Land Allocation - $100,000) 8 (Design and Contingencies - $40,000) 9 (19) Plymouth Township, Belvoir Road 10 Bridge over Saw Mill Creek, Bridge 11 Replacement 445,000 12 (Base Construction Allocation - 13 $400,000) 14 (Design and Contingencies - $45,000) 15 (b) State Bridges 16 (1) S.R.3051, Old Betzwood Bridge over 17 Schuylkill River, West Norriton and 18 Upper Merion Townships, Bridge 19 Replacement 5,500,000 20 (Base Construction Allocation - 21 $4,800,000) 22 (Land Allocation - $150,000) 23 (Design and Contingencies - $550,000) 24 (2) S.R.4040, Gilbertsville Road Bridge 25 over Branch of Minister Creek, Douglass 26 Township, Bridge Replacement 215,000 27 (Base Construction Allocation - 28 $175,000) 29 (Land Allocation - $20,000) 30 (Design and Contingencies - $20,000) 19920S1746B2236 - 158 -
1 (3) S.R.3020, Danne Hower Bridge over 2 Schuylkill River, Upper Merion and 3 Norristown, Bridge Deck Rehabilitation 11,000,000 4 (Base Construction Allocation - 5 $10,450,000) 6 (Design and Contingencies - $550,000) 7 (4) S.R.0100, Pa.100 South of Pa.724 to 8 Berks County Line, 11 bridges 9 approximately, Douglass, Upper 10 Pottsgrove, Pottstown and North 11 Coventry Townships, Bridge Deck 12 Rehabilitation 3,800,000 13 (Base Construction Allocation - 14 $3,610,000) 15 (Design and Contingencies - $190,000) 16 (5) S.R.0063, Welsh Road Bridge over 17 Pennypack Creek, Lower Moreland 18 Township, Bridge Replacement 215,000 19 (Base Construction Allocation - 20 $175,000) 21 (Land Allocation - $20,000) 22 (Design and Contingencies - $20,000) 23 (6) S.R.0073, Washington Lane Bridge over 24 SEPTA, Cheltenham Township, Bridge Deck 25 Rehabilitation 2,990,000 26 (Base Construction Allocation - 27 $2,840,000) 28 (Design and Contingencies - $150,000) 29 (7) S.R.2034, Edgehill Road and York Road, 30 Abington Township, Bridge Deck 19920S1746B2236 - 159 -
1 Rehabilitation 250,000 2 (Base Construction Allocation - 3 $237,000) 4 (Design and Contingencies - $13,000) 5 (8) S.R.2025, Central Avenue Bridge over 6 Tacony Creek, Cheltenham Township, 7 Bridge Replacement 650,000 8 (Base Construction Allocation - 9 $500,000) 10 (Land Allocation - $75,000) 11 (Design and Contingencies - $75,000) 12 (9) Meetinghouse Road, Bridge over Branch 13 of Tacony Creek, Abington Township, 14 Bridge Replacement 285,000 15 (Base Construction Allocation - 16 $160,000) 17 (Land Allocation - $100,000) 18 (Design and Contingencies - $25,000) 19 (10) Mill Road Bridge over Meadowbrook 20 Creek, Abington Township, Bridge 21 Replacement 2,100,000 22 (Base Construction Allocation - 23 $1,500,000) 24 (Land Allocation - $200,000) 25 (Design and Contingencies - $400,000) 26 Section 51. Montour County. 27 (a) Local Bridges (Reserved) 28 (b) State Bridges 29 (1) S.R.3006 Bridge over Branch of Beaver 30 Run, Liberty Township, Bridge 19920S1746B2236 - 160 -
1 Replacement 322,000 2 (Base Construction Allocation - 3 $269,000) 4 (Land Allocation - $30,000) 5 (Design and Contingencies - $23,000) 6 (2) S.R.0054, Danville - Riverside Bridge 7 over Susquehanna River, Danville 8 Borough, Bridge Rehabilitation 1,430,000 9 (Base Construction Allocation - 10 $1,300,000) 11 (Design and Contingencies - $130,000) 12 Section 52. Northampton County. 13 (a) Local Bridges 14 (1) City of Easton, Market Street, Bridge 15 Replacement 83,000 16 (Base Construction Allocation - 17 $72,000) 18 (Design and Contingencies - $11,000) 19 (2) City of Easton, Church Street, Bridge 20 Replacement 28,000 21 (Base Construction Allocation - 22 $25,000) 23 (Design and Contingencies - $3,000) 24 (3) Bushkill Township, T-638, Keller Road 25 over Tributary to Bushkill Creek, 26 Bridge Replacement 110,000 27 (Base Construction Allocation - 28 $70,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $30,000) 19920S1746B2236 - 161 -
1 (4) Plainfield Township, T-629, County 2 Bridge No.207 over Wind Gap Creek, 3 Bridge Replacement 150,000 4 (Base Construction Allocation - 5 $115,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $25,000) 8 (5) City of Easton, Bushkill Drive over 9 Bushkill Creek, Bridge Replacement 530,000 10 (Base Construction Allocation - 11 $450,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $70,000) 14 (6) Allen Township, T-465B, Atlas Road 15 over Dry Run Creek, Bridge Replacement 145,000 16 (Base Construction Allocation - 17 $110,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $25,000) 20 (7) Upper Mount Bethel Township, T-701, 21 County Bridge No.221 over Jacoby Creek, 22 Bridge Replacement 145,000 23 (Base Construction Allocation - 24 $110,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $25,000) 27 (8) Lower Mount Bethel Township, T-663, 28 County Bridge No.202 over Oughoughton 29 Creek, Bridge Replacement 180,000 30 (Base Construction Allocation - 19920S1746B2236 - 162 -
1 $140,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $30,000) 4 (9) Moore Township, T-588, County Bridge 5 No.146 over Hokendaqua Creek, Bridge 6 Replacement 175,000 7 (Base Construction Allocation - 8 $135,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $30,000) 11 (10) Lower Nazareth Township, T-436, 12 County Bridge No.102 over Monocacy 13 Creek, Bridge Replacement 300,000 14 (Base Construction Allocation - 15 $250,000) 16 (Land Allocation - $15,000) 17 (Design and Contingencies - $35,000) 18 (11) Freemansburg Borough, Church Street 19 Bridge over Conrail, Bridge 20 Replacement 190,000 21 (Base Construction Allocation - 22 $165,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $15,000) 25 (12) Freemansburg Borough, Market Street 26 Bridge over Conrail, Bridge 27 Replacement 190,000 28 (Base Construction Allocation - 29 $165,000) 30 (Land Allocation - $10,000) 19920S1746B2236 - 163 -
1 (Design and Contingencies - $15,000) 2 (13) City of Bethlehem, Lynn Avenue Bridge 3 between S.R.0412 and East 6th Street, 4 Bridge Replacement 1,857,000 5 (Base Construction Allocation - 6 $1,572,000) 7 (Land Allocation - $15,000) 8 (Design and Contingencies - $270,000) 9 (b) State Bridges 10 (1) S.R.0611 Front Street over Bushkill 11 Creek, City of Easton, Bridge 12 Replacement 1,139,000 13 (Base Construction Allocation - 14 $1,035,000) 15 (Design and Contingencies - $104,000) 16 (2) S.R.3020 over East Branch of the 17 Monocacy Creek, Upper Nazareth 18 Township, Bridge Replacement 227,000 19 (Base Construction Allocation - 20 $174,000) 21 (Land Allocation - $35,000) 22 (Design and Contingencies - $18,000) 23 (3) S.R.3020 over Tributary to Monocacy 24 Creek near Georgetown Road, Lower 25 Nazareth Township, Bridge Replacement 271,000 26 (Base Construction Allocation - 27 $208,000) 28 (Land Allocation - $42,000) 29 (Design and Contingencies - $21,000) 30 (4) S.R.1012 over Bushkill Creek, Bushkill 19920S1746B2236 - 164 -
1 Township, Bridge Replacement 222,000 2 (Base Construction Allocation - 3 $201,000) 4 (Design and Contingencies - $21,000) 5 (5) S.R.2017 13th Street over S.R.0022, 6 City of Easton Bridge Replacement 465,000 7 (Base Construction Allocation - 8 $422,000) 9 (Design and Contingencies - $43,000) 10 (6) S.R.4006 Whitetail Deer Drive over 11 West Branch of Monocacy Creek, Moore 12 Township, Bridge Replacement 169,000 13 (Base Construction Allocation - 14 $130,000) 15 (Land Allocation - $26,000) 16 (Design and Contingencies - $13,000) 17 (7) S.R.0329 over Limestone Quarry, Allen 18 Township, Bridge Replacement 464,000 19 (Base Construction Allocation - 20 $356,000) 21 (Land Allocation - $72,000) 22 (Design and Contingencies - $36,000) 23 (8) S.R.0329 over Dry Run, Allen Township, 24 Bridge Replacement 146,000 25 (Base Construction Allocation - 26 $111,000) 27 (Land Allocation - $23,000) 28 (Design and Contingencies - $12,000) 29 (9) S.R.0329 over Hokendaqua Creek, 30 Northampton Borough, Bridge 19920S1746B2236 - 165 -
1 Replacement 812,000 2 (Base Construction Allocation - 3 $624,000) 4 (Land Allocation - $125,000) 5 (Design and Contingencies - $63,000) 6 Section 53. Northumberland County. 7 (a) Local Bridges 8 (1) West Cameron Township, T-480, County 9 Bridge No.167 over Mahanoy Creek, 10 Bridge Replacement 815,000 11 (Base Construction Allocation - 12 $652,000) 13 (Design and Contingencies - $163,000) 14 (2) Mount Carmel Borough, North Vine 15 Street Bridge over Shamokin Creek, 16 Bridge Rehabilitation 320,000 17 (Base Construction Allocation - 18 $240,000) 19 (Design and Contingencies - $80,000) 20 (3) Milton Borough, Brown Avenue Bridge 21 over Limestone Run, Bridge Replacement 400,000 22 (Base Construction Allocation - 23 $320,000) 24 (Design and Contingencies - $80,000) 25 (4) Milton Borough, Filbert Street Bridge 26 over Limestone Run, Bridge Replacement 650,000 27 (Base Construction Allocation - 28 $500,000) 29 (Design and Contingencies - $150,000) 30 (b) State Bridges 19920S1746B2236 - 166 -
1 (1) S.R.3012, Fiddlers Run Bridge over 2 Fiddlers Run, Jackson and Lower Mahanoy 3 Townships Bridge Replacement 407,000 4 (Base Construction Allocation - 5 $326,000) 6 (Land Allocation - $20,000) 7 (Design and Contingencies - $61,000) 8 (2) S.R.2016 Bridge over Shamokin Creek, 9 Shamokin Township, Bridge Replacement 789,000 10 (Base Construction Allocation - 11 $631,000) 12 (Land Allocation - $39,000) 13 (Design and Contingencies - $119,000) 14 (3) S.R.2017 Bridge over Coal Run, Coal 15 Township, Bridge Replacement 436,000 16 (Base Construction Allocation - 17 $349,000) 18 (Land Allocation - $22,000) 19 (Design and Contingencies - $65,000) 20 Section 54. Perry County. 21 (a) Local Bridges (Reserved) 22 (b) State Bridges 23 (1) S.R.50014, Delville Road Bridge over 24 Sherman Creek, Penn Township, Bridge 25 Replacement 1,250,000 26 (Base Construction Allocation - 27 $1,079,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $161,000) 30 (2) S.R.50014, Delville Road Bridge over 19920S1746B2236 - 167 -
1 Sherman Creek, Penn and Wheatfield 2 Townships, Bridge Replacement 1,272,000 3 (Base Construction Allocation - 4 $1,099,000) 5 (Land Allocation - $8,000) 6 (Design and Contingencies - $165,000) 7 (3) S.R.3009, Shermans Creek Bridge over 8 Shermans Creek, Southwest Madison 9 Township, Bridge Replacement 730,000 10 (Base Construction Allocation - 11 $610,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $100,000) 14 Section 55. Philadelphia County. 15 (a) Local Bridges (Reserved) 16 (b) State Bridges 17 (1) S.R.1002, Adams Avenue Bridge over 18 Tacony Creek, City of Philadelphia, 19 Bridge Rehabilitation 1,200,000 20 (Base Construction Allocation - 21 $850,000) 22 (Land Allocation - $100,000) 23 (Design and Contingencies - $250,000) 24 (2) S.R.4006, City Avenue S.B. over 25 Schuylkill, City of Philadelphia, 26 Bridge Deck Replacement 7,950,000 27 (Base Construction Allocation - 28 $7,500,000) 29 (Land Allocation - $100,000) 30 (Design and Contingencies - $350,000) 19920S1746B2236 - 168 -
1 (3) S.R.0063, Woodhaven Road: U.S. 1 to I- 2 95, 6 bridges, Philadelphia and 3 Bensalem Townships, Bridge Deck 4 Rehabilitation 3,500,000 5 (Base Construction Allocation - 6 $3,325,000) 7 (Design and Contingencies - $175,000) 8 Section 56. Pike County. 9 (a) Local Bridges 10 (1) Milford Borough and Dingman Township, 11 T-426, Mott Street Bridge No.21 over 12 Sawkill Creek, Bridge Replacement 1,550,000 13 (Base Construction Allocation - 14 $1,310,000) 15 (Land Allocation - $40,000) 16 (Design and Contingencies - $200,000) 17 (2) Shohola Township, T-440, Aumuller 18 Bridge No.24 over Balliard Creek, 19 Bridge Replacement 210,000 20 (Base Construction Allocation - 21 $165,000) 22 (Land Allocation - $20,000) 23 (Design and Contingencies - $25,000) 24 (3) Porter Township, T-317, Bridge No.5 25 over Big Bushkill Creek, Bridge 26 Replacement 450,000 27 (Base Construction Allocation - 28 $370,000) 29 (Land Allocation - $25,000) 30 (Design and Contingencies - $55,000) 19920S1746B2236 - 169 -
1 (4) Porter Township, T-317, Bridge No.4 2 over Spruce Run, Bridge Replacement 135,000 3 (Base Construction Allocation - 4 $100,000) 5 (Land Allocation - $20,000) 6 (Design and Contingencies - $15,000) 7 (5) Dingman Township, T-424, Bridge No.5 8 Rattlesnake Bridge over Rattlesnake 9 Creek, Bridge Replacement 210,000 10 (Base Construction Allocation - 11 $165,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $25,000) 14 (b) State Bridges 15 (1) S.R.0006 Bridge over Delaware River, 16 Matamoras Borough, Bridge Replacement 330,000 17 (Base Construction Allocation - 18 $300,000) 19 (Design and Contingencies - $30,000) 20 (2) S.R.0084 Bridge over Delaware River, 21 Matamoras Borough, Bridge Replacement 700,000 22 (Base Construction Allocation - 23 $600,000) 24 (Design and Contingencies - $100,000) 25 (3) S.R.0402 Bridge over Blooming Grove 26 Creek, Blooming Grove Township, Bridge 27 Replacement 460,000 28 (Base Construction Allocation - 29 $400,000) 30 (Land Allocation - $10,000) 19920S1746B2236 - 170 -
1 (Design and Contingencies - $50,000) 2 (4) S.R.2001 Bridge over Toms Creek, 3 Lehman Township, Bridge Replacement 536,000 4 (Base Construction Allocation - 5 $470,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $56,000) 8 (5) S.R.2001 Bridge over Branch of 9 Valentine Brook, Milford Borough, 10 Bridge Replacement 570,000 11 (Base Construction Allocation - 12 $500,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $60,000) 15 (6) S.R.0507 Bridge over Tributary to 16 Wallenpaupack Creek, Palmyra Township, 17 Bridge Replacement 460,000 18 (Base Construction Allocation - 19 $400,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $50,000) 22 (7) S.R.0209 Bridge over Sawskill Creek, 23 Milford Borough, Bridge Replacement 2,280,000 24 (Base Construction Allocation - 25 $2,020,000) 26 (Land Allocation - $20,000) 27 (Design and Contingencies - $240,000) 28 Section 57. Potter County. 29 (a) Local Bridges (Reserved) 30 (b) State Bridges 19920S1746B2236 - 171 -
1 (1) S.R.0044, Kettle Creek Bridge over 2 Kettle Creek, Stewardson Township, 3 Bridge Replacement 1,150,000 4 (Base Construction Allocation - 5 $900,000) 6 (Land Allocation - $100,000) 7 (Design and Contingencies - $150,000) 8 (2) S.R.0044 Bridge over Kettle Creek, 9 Stewardson Township, Bridge 10 Replacement 1,150,000 11 (Base Construction Allocation - 12 $900,000) 13 (Land Allocation - $100,000) 14 (Design and Contingencies - $150,000) 15 (3) S.R.0006 Bridge over Allegheny River, 16 Coudersport Borough, Bridge 17 Replacement 1,500,000 18 (Base Construction Allocation - 19 $1,250,000) 20 (Land Allocation - $100,000) 21 (Design and Contingencies - $150,000) 22 (4) S.R.0044 Bridge over Sharon Creek, 23 Sharon Township, Bridge Replacement 800,000 24 (Base Construction Allocation - 25 $600,000) 26 (Land Allocation - $100,000) 27 (Design and Contingencies - $100,000) 28 (5) S.R.0244 Bridge over Ellisburg Creek, 29 Genesee Township, Bridge Replacement 650,000 30 (Base Construction Allocation - 19920S1746B2236 - 172 -
1 $450,000) 2 (Land Allocation - $100,000) 3 (Design and Contingencies - $100,000) 4 (6) S.R.1010 Bridge over Genesee River, 5 Genesee Township, Bridge Replacement 1,600,000 6 (Base Construction Allocation - 7 $1,250,000) 8 (Land Allocation - $150,000) 9 (Design and Contingencies - $200,000) 10 (7) S.R.1011, Bridge No.2 over Genesee 11 River, Genesee Township, Bridge 12 Replacement 850,000 13 (Base Construction Allocation - 14 $650,000) 15 (Land Allocation - $100,000) 16 (Design and Contingencies - $100,000) 17 (8) S.R.1020 Bridge over West Branch of 18 Pine Creek, Galeton Borough, Bridge 19 Replacement 1,525,000 20 (Base Construction Allocation - 21 $1,250,000) 22 (Land Allocation - $100,000) 23 (Design and Contingencies - $175,000) 24 (9) S.R.1024 Bridge over Pine Creek, 25 Ulysses Township, Bridge Replacement 450,000 26 (Base Construction Allocation - 27 $250,000) 28 (Land Allocation - $100,000) 29 (Design and Contingencies - $100,000) 30 (10) S.R.1024 Bridge over Genesee Fork of 19920S1746B2236 - 173 -
1 Pine Creek, Ulysses Township, Bridge 2 Replacement 1,300,000 3 (Base Construction Allocation - 4 $1,000,000) 5 (Land Allocation - $150,000) 6 (Design and Contingencies - $150,000) 7 (11) S.R.4003 Bridge over Fishing Creek, 8 Roulette Township, Bridge Replacement 950,000 9 (Base Construction Allocation - 10 $750,000) 11 (Land Allocation - $100,000) 12 (Design and Contingencies - $100,000) 13 Section 58. Schuylkill County. 14 (a) Local Bridges 15 (1) North Union Township, T-455 over 16 Tomhicken Creek, Bridge Replacement 178,000 17 (Base Construction Allocation - 18 $138,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $30,000) 21 (2) Union Township, T-794 over Little 22 Catawissa Creek, Bridge Replacement 180,000 23 (Base Construction Allocation - 24 $140,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $30,000) 27 (3) Branch Township, T-564, Diamond Street 28 over West Creek, Bridge Replacement 190,000 29 (Base Construction Allocation - 30 $150,000) 19920S1746B2236 - 174 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $30,000) 3 (4) East Brunswick Township, T-757 over 4 Indian Run, Bridge Replacement 155,000 5 (Base Construction Allocation - 6 $115,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $30,000) 9 (5) Hegins Township, T-388, Wood Lane 10 Bridge over Deep Creek, Bridge 11 Replacement 220,000 12 (Base Construction Allocation - 13 $175,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $35,000) 16 (6) Barry Township, T-577, County Bridge 17 No.7 over Deep Creek, Bridge 18 Replacement 155,000 19 (Base Construction Allocation - 20 $115,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $30,000) 23 (7) Porter Township, T-418, County Bridge 24 No.67 over Wisconisco Creek, Bridge 25 Replacement 235,000 26 (Base Construction Allocation - 27 $180,000) 28 (Land Allocation - $15,000) 29 (Design and Contingencies - $40,000) 30 (8) Pine Grove Township, T-406, County 19920S1746B2236 - 175 -
1 Bridge No.108 over Little Swatara 2 Creek, Bridge Replacement 395,000 3 (Base Construction Allocation - 4 $325,000) 5 (Land Allocation - $20,000) 6 (Design and Contingencies - $50,000) 7 (9) West Brunswick Township, T-723, 8 Industrial Park Road Bridge over Pine 9 Creek, Bridge Replacement 420,000 10 (Base Construction Allocation - 11 $350,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $50,000) 14 (10) Hegins Township, T-474, Gap School 15 Road Bridge over Rausch Creek, Bridge 16 Replacement 150,000 17 (Base Construction Allocation - 18 $110,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $30,000) 21 (11) Hegins Township, T-474, Gap School 22 Road Bridge over Pine Creek, Bridge 23 Replacement 185,000 24 (Base Construction Allocation - 25 $145,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $30,000) 28 (12) Hubley Township, T-446, County Bridge 29 No.71 over Deep Creek, Bridge 30 Replacement 400,000 19920S1746B2236 - 176 -
1 (Base Construction Allocation - 2 $330,000) 3 (Land Allocation - $20,000) 4 (Design and Contingencies - $50,000) 5 (13) Girardville Borough, John Street 6 Bridge over Mahanoy Creek, Bridge 7 Replacement 245,000 8 (Base Construction Allocation - 9 $200,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $35,000) 12 (14) St. Clair Borough, Sherman Street 13 County Bridge No.48 over Mill Creek, 14 Bridge Replacement 300,000 15 (Base Construction Allocation - 16 $240,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $40,000) 19 (15) Pine Grove Borough, Mill Street 20 County Bridge No.33 over Swatara Creek, 21 Bridge Replacement 725,000 22 (Base Construction Allocation - 23 $630,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $75,000) 26 (16) St. Clair Borough, Russell Street 27 Bridge over Mill Creek, Bridge 28 Replacement 260,000 29 (Base Construction Allocation - 30 $200,000) 19920S1746B2236 - 177 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $40,000) 3 (17) Gilberton Borough, Railroad Street 4 Bridge over Mahanoy Creek, Bridge 5 Replacement 190,000 6 (Base Construction Allocation - 7 $150,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $30,000) 10 (18) Gilberton Borough, Bridge Street 11 County Bridge No.78 over Mahanoy Creek, 12 Bridge Replacement 245,000 13 (Base Construction Allocation - 14 $200,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $35,000) 17 (19) Landingville Borough, Canal Street 18 Bridge over Schuylkill River, Bridge 19 Replacement 740,000 20 (Base Construction Allocation - 21 $640,000) 22 (Land Allocation - $20,000) 23 (Design and Contingencies - $80,000) 24 (20) Blythe Township, T-770, Ridge Street 25 Bridge over Schuylkill River, Bridge 26 Replacement 450,000 27 (Base Construction Allocation - 28 $380,000) 29 (Land Allocation - $20,000) 30 (Design and Contingencies - $50,000) 19920S1746B2236 - 178 -
1 (21) North Manheim Township, T-686, 2 Memorial Drive under abandoned railroad 3 line, Bridge Removal 295,000 4 (Base Construction Allocation - 5 $250,000) 6 (Land Allocation - $20,000) 7 (Design and Contingencies - $25,000) 8 (22) Frackville Borough, Spring Street 9 overpass, under Reading Railroad, 10 Bridge Removal 72,000 11 (Base Construction Allocation - 12 $52,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $10,000) 15 (23) Hegins Township, T-478, Bridge over 16 Pine Creek, Bridge Replacement 148,000 17 (Base Construction Allocation - 18 $129,000) 19 (Land Allocation - $6,000) 20 (Design and Contingencies - $13,000) 21 (b) State Bridges 22 (1) S.R.0309 Center Street over Little 23 Schuylkill River, Tamaqua Borough, 24 Bridge Replacement 1,253,000 25 (Base Construction Allocation - 26 $963,000) 27 (Land Allocation - $193,000) 28 (Design and Contingencies - $97,000) 29 (2) S.R.0061 over Schuylkill River, City 30 of Pottsville, Bridge Replacement 329,000 19920S1746B2236 - 179 -
1 (Base Construction Allocation - 2 $299,000) 3 (Design and Contingencies - $30,000) 4 (3) S.R.0061 over Railroad near City of 5 Pottsville, Bridge Replacement 1,323,000 6 (Base Construction Allocation - 7 $1,202,000) 8 (Design and Contingencies - $121,000) 9 (4) S.R.0895 over Bear Creek, Wayne 10 Township, Bridge Replacement 169,000 11 (Base Construction Allocation - 12 $130,000) 13 (Land Allocation - $26,000) 14 (Design and Contingencies - $13,000) 15 (5) S.R.4042 over West Branch of 16 Schuylkill River, Minersville Borough, 17 Bridge Replacement 468,000 18 (Base Construction Allocation - 19 $360,000) 20 (Land Allocation - $72,000) 21 (Design and Contingencies - $36,000) 22 (6) S.R.4002 over West Branch of 23 Schuylkill River, Cass Township, Bridge 24 Replacement 296,000 25 (Base Construction Allocation - 26 $269,000) 27 (Design and Contingencies - $27,000) 28 (7) S.R.0501 over Branch of Little Swatara 29 Creek, Pine Grove Township, Bridge 30 Replacement 130,000 19920S1746B2236 - 180 -
1 (Base Construction Allocation - 2 $100,000) 3 (Land Allocation - $20,000) 4 (Design and Contingencies - $10,000) 5 (8) S.R.1002 Pottsville Street over Mill 6 Creek, Port Carbon Borough, Bridge 7 Replacement 603,000 8 (Base Construction Allocation - 9 $548,000) 10 (Design and Contingencies - $55,000) 11 (9) S.R.0209 over a mine shaft near 12 Mechanicsville Borough, Port Carbon 13 Borough, Bridge Replacement 48,000 14 (Base Construction Allocation - 15 $40,000) 16 (Design and Contingencies - $8,000) 17 (10) S.R.0924 overpass under Reading 18 Railroad, Frackville Borough, Bridge 19 Removal 120,000 20 (Base Construction Allocation - 21 $100,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $10,000) 24 (11) S.R.2006 over Mahannon Creek, West 25 Brunswick Township, Bridge Removal 107,000 26 (Base Construction Allocation - 27 $92,000) 28 (Land Allocation - $5,000) 29 (Design and Contingencies - $10,000) 30 Section 59. Snyder County. 19920S1746B2236 - 181 -
1 (a) Local Bridges (Reserved) 2 (b) State Bridges 3 (1) S.R.1017 Bridge over Rolling Green 4 Run, Monroe Township, Bridge 5 Replacement 395,000 6 (Base Construction Allocation - 7 $316,000) 8 (Land Allocation - $20,000) 9 (Design and Contingencies - $59,000) 10 Section 60. Somerset County. 11 (a) Local Bridges 12 (1) Elk Lick Township, Moser Bridge, 13 Bridge Replacement 759,000 14 (Base Construction Allocation - 15 $694,000) 16 (Land Allocation - $5,000) 17 (Design and Contingencies - $60,000) 18 (2) Allegheny Township, Brush Creek 19 Bridge, Bridge Replacement 306,000 20 (Base Construction Allocation - 21 $268,000) 22 (Land Allocation - $5,000) 23 (Design and Contingencies - $33,000) 24 (3) Elk Lick Township, Maust Bridge, 25 Bridge Replacement 866,000 26 (Base Construction Allocation - 27 $794,000) 28 (Land Allocation - $5,000) 29 (Design and Contingencies - $67,000) 30 (4) Fairhope Township, Pack Saddle Bridge, 19920S1746B2236 - 182 -
1 Bridge Replacement 228,000 2 (Base Construction Allocation - 3 $200,000) 4 (Land Allocation - $5,000) 5 (Design and Contingencies - $23,000) 6 (5) Southampton Township, Emerick Bridge, 7 Bridge Replacement 265,000 8 (Base Construction Allocation - 9 $230,000) 10 (Land Allocation - $5,000) 11 (Design and Contingencies - $30,000) 12 (6) Stonycreek Township, Brady Bridge, 13 Bridge Replacement 601,000 14 (Base Construction Allocation - 15 $546,000) 16 (Land Allocation - $5,000) 17 (Design and Contingencies - $50,000) 18 (7) Northampton Township, Philson Bridge, 19 Bridge Replacement 367,000 20 (Base Construction Allocation - 21 $325,000) 22 (Land Allocation - $5,000) 23 (Design and Contingencies - $37,000) 24 (8) Somerset Township, Housefeldt Bridge, 25 Bridge Replacement 366,000 26 (Base Construction Allocation - 27 $325,000) 28 (Land Allocation - $5,000) 29 (Design and Contingencies - $36,000) 30 (b) State Bridges 19920S1746B2236 - 183 -
1 (1) S.R.0219, Miller Run Bridge No.2, 2 Brothers Valley Township, Bridge 3 Replacement 560,000 4 (Base Construction Allocation - 5 $465,000) 6 (Land Allocation - $25,000) 7 (Design and Contingencies - $70,000) 8 (2) S.R.2005, Intersection Bridge over Elk 9 Lick Creek, Somerset Township, Bridge 10 Replacement 558,000 11 (Base Construction Allocation - 12 $442,000) 13 (Land Allocation - $50,000) 14 (Design and Contingencies - $66,000) 15 (3) S.R.1004, East Shanksville Bridge over 16 Rhoades Creek, Shanksville Borough, 17 Bridge Replacement 992,000 18 (Base Construction Allocation - 19 $789,000) 20 (Land Allocation - $100,000) 21 (Design and Contingencies - $103,000) 22 (4) S.R.0281, Southwest Somerset Bridge 23 over West Branch Coxes Creek, Somerset 24 Township, Bridge Replacement 678,000 25 (Base Construction Allocation - 26 $556,000) 27 (Land Allocation - $50,000) 28 (Design and Contingencies - $72,000) 29 (5) S.R.0031, East Brotherton Bridge over 30 Sandy Hallow Creek, Stoneycreek 19920S1746B2236 - 184 -
1 Township, Bridge Replacement 535,000 2 (Base Construction Allocation - 3 $445,000) 4 (Land Allocation - $25,000) 5 (Design and Contingencies - $65,000) 6 (6) S.R.0219, Miller Run Bridge No.1, 7 Brothers Valley Township, Bridge 8 Replacement 560,000 9 (Base Construction Allocation - 10 $465,000) 11 (Land Allocation - $25,000) 12 (Design and Contingencies - $70,000) 13 (7) S.R.0031, Kimberly Run Bridge, 14 Somerset Township, Bridge Replacement 525,000 15 (Base Construction Allocation - 16 $435,000) 17 (Land Allocation - $25,000) 18 (Design and Contingencies - $65,000) 19 (8) S.R.2021, Burkhart Bridge over 20 Shaffers Run, Fairhope Township, Bridge 21 Replacement 675,000 22 (Base Construction Allocation - 23 $553,000) 24 (Land Allocation - $50,000) 25 (Design and Contingencies - $72,000) 26 (9) S.R.2021, Midway Bridge over Shaffers 27 Run, Fairhope Township, Bridge 28 Replacement 560,000 29 (Base Construction Allocation - 30 $444,000) 19920S1746B2236 - 185 -
1 (Land Allocation - $50,000) 2 (Design and Contingencies - $66,000) 3 (10) S.R.4041, Krings Bridge over 4 Stonycreek River, Conemaugh Township, 5 Bridge Replacement 2,496,000 6 (Base Construction Allocation - 7 $2,087,000) 8 (Land Allocation - $200,000) 9 (Design and Contingencies - $209,000) 10 Section 61. Sullivan County (Reserved). 11 Section 62. Susquehanna County. 12 (a) Local Bridges (Reserved) 13 (b) State Bridges 14 (1) S.R.0374 over Tunkhannock Creek, 15 Clifford Township, Bridge Replacement 350,000 16 (Base Construction Allocation - 17 $300,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $40,000) 20 (2) S.R.2021 over Tunkhannock Creek, 21 Lenoxville Borough, Bridge Replacement 800,000 22 (Base Construction Allocation - 23 $700,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $90,000) 26 (3) S.R.2021 over Tunkhannock Creek, Lenox 27 Township, Bridge Replacement 1,470,000 28 (Base Construction Allocation - 29 $1,300,000) 30 (Land Allocation - $10,000) 19920S1746B2236 - 186 -
1 (Design and Contingencies - $160,000) 2 (4) S.R.0267 over East Branch of Wyalusing 3 Creek, Rush Township, Bridge 4 Replacement 1,250,000 5 (Base Construction Allocation - 6 $1,107,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $133,000) 9 (5) S.R.0106 over East Branch of 10 Tunkhannock Creek, Clifford Township, 11 Bridge Replacement 1,018,000 12 (Base Construction Allocation - 13 $900,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $108,000) 16 (6) S.R.0171 over East Branch of 17 Lackawanna River, Clifford Township, 18 Bridge Replacement 2,938,000 19 (Base Construction Allocation - 20 $2,605,000) 21 (Land Allocation - $20,000) 22 (Design and Contingencies - $313,000) 23 (7) S.R.0106 over East Branch of 24 Tunkhannock Creek, Clifford Township, 25 Bridge Replacement 1,870,000 26 (Base Construction Allocation - 27 $1,660,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $200,000) 30 (8) S.R.0374 over Tunkhannock Creek, Lenox 19920S1746B2236 - 187 -
1 Township, Bridge Replacement 370,000 2 (Base Construction Allocation - 3 $320,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $40,000) 6 (9) S.R.3029 over East Branch of Wyalusing 7 Creek, Jessup Township, Bridge 8 Replacement 794,000 9 (Base Construction Allocation - 10 $700,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $84,000) 13 (10) S.R.1010 over Lewis Creek, Oakland 14 Township, Bridge Replacement 486,000 15 (Base Construction Allocation - 16 $425,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $51,000) 19 (11) S.R.0858 over Apolacon Creek, Little 20 Meadows Borough, Bridge Replacement 1,197,000 21 (Base Construction Allocation - 22 $1,060,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $127,000) 25 (12) S.R.0848 over Branch of Butler Creek, 26 Gibson Township, Bridge Replacement 532,000 27 (Base Construction Allocation - 28 $466,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $56,000) 19920S1746B2236 - 188 -
1 (13) S.R.2050 over North Branch of 2 Tunkhannock Creek, Clifford Township, 3 Bridge Replacement 553,000 4 (Base Construction Allocation - 5 $485,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $58,000) 8 (14) S.R.2061 over Meylert Creek, New 9 Milford Township, Bridge Replacement 380,000 10 (Base Construction Allocation - 11 $330,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $40,000) 14 (15) S.R.3012 over West Branch of 15 Meshoppen Creek, Springville Township, 16 Bridge Replacement 676,000 17 (Base Construction Allocation - 18 $595,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $71,000) 21 (16) S.R.2096 over Horton Creek, Lathrop 22 Township, Bridge Replacement 458,000 23 (Base Construction Allocation - 24 $400,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $48,000) 27 (17) S.R.0267 over Branch of Choconut 28 Creek, Choconut Township, Bridge 29 Replacement 794,000 30 (Base Construction Allocation - 19920S1746B2236 - 189 -
1 $700,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $84,000) 4 Section 63. Tioga County (Reserved). 5 Section 64. Union County. 6 (a) Local Bridges 7 (1) West Buffalo Township, T-380, School 8 House Bridge over Buffalo Creek, Bridge 9 Replacement 779,000 10 (Base Construction Allocation - 11 $623,000) 12 (Land Allocation - $39,000) 13 (Design and Contingencies - $117,000) 14 2) Kelly Township, T-450, County Bridge 15 No.8, Nogle Bridge over Buffalo Creek, 16 Bridge Replacement 1,026,000 17 (Base Construction Allocation - 18 $821,000) 19 (Land Allocation - $51,000) 20 (Design and Contingencies - $154,000) 21 (3) Mifflinburg Borough, County Bridge 22 No.14, Iddings Bridge over Buffalo 23 Creek, Bridge Replacement 493,000 24 (Base Construction Allocation - 25 $394,000) 26 (Land Allocation - $25,000) 27 (Design and Contingencies - $74,000) 28 (4) Hartley Township, Trails End Bridge 29 over Penns Creek, Bridge Replacement 1,120,000 30 (Base Construction Allocation - 19920S1746B2236 - 190 -
1 $896,000) 2 (Land Allocation - $56,000) 3 (Design and Contingencies - $168,000) 4 (5) White Deer Township, Bowersox Bridge 5 over Spruce Run, Bridge Replacement 300,000 6 (Base Construction Allocation - 7 $240,000) 8 (Land Allocation - $15,000) 9 (Design and Contingencies - $45,000) 10 (6) Limestone Township, Deer Bridge over 11 Sweitzer Run, Bridge Replacement 350,000 12 (Base Construction Allocation - 13 $280,000) 14 (Land Allocation - $15,000) 15 (Design and Contingencies - $55,000) 16 (b) State Bridges (Reserved) 17 Section 65. Venango County. 18 (a) Local Bridges 19 (1) Cherry Tree Township, T-520 over 20 Prather Creek, Bridge Replacement 120,000 21 (Base Construction Allocation - 22 $96,000) 23 (Land Allocation - $12,000) 24 (Design and Contingencies - $12,000) 25 (2) Oil Creek Township, T-639 on Coe Road 26 over Pithole Creek, Bridge Replacement 112,000 27 (Base Construction Allocation - 28 $90,000) 29 (Land Allocation - $11,000) 30 (Design and Contingencies - $11,000) 19920S1746B2236 - 191 -
1 (3) Oakland Township, T-450 over Two Mule 2 Run Tributary, Bridge Replacement 154,000 3 (Base Construction Allocation - 4 $124,000) 5 (Land Allocation - $15,000) 6 (Design and Contingencies - $15,000) 7 (4) Cherry Tree Township, T-649 over 8 Prather Creek, Bridge Replacement 120,000 9 (Base Construction Allocation - 10 $96,000) 11 (Land Allocation - $12,000) 12 (Design and Contingencies - $12,000) 13 (5) Rockland Township, T-512, Slab Furnace 14 Railroad over Conrail Railroad, Bridge 15 Replacement 442,000 16 (Base Construction Allocation - 17 $384,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $48,000) 20 (6) Rockland Township, T-582, Conrail 21 Bridge T-582 over Conrail Railroad, 22 Bridge Replacement 385,000 23 (Base Construction Allocation - 24 $345,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $30,000) 27 (b) State Bridges 28 (1) S.R.3007, Witherup Bridge over 29 Scrubgrass Creek, Clinton Township, 30 Bridge Replacement 850,000 19920S1746B2236 - 192 -
1 (Base Construction Allocation - 2 $665,000) 3 (Land Allocation - $60,000) 4 (Design and Contingencies - $125,000) 5 (2) S.R.0036 on Col. Drake Highway over 6 Pithole Creek, Allegheny Township, 7 Bridge Replacement 900,000 8 (Base Construction Allocation - 9 $765,000) 10 (Land Allocation - $45,000) 11 (Design and Contingencies - $90,000) 12 Section 66. Warren County. 13 (a) Local Bridges 14 (1) Pittsfield Township, T-435 over 15 Andrews Run, Bridge Replacement 192,000 16 (Base Construction Allocation - 17 $154,000) 18 (Land Allocation - $19,000) 19 (Design and Contingencies - $19,000) 20 (2) Freehold Township, T-549 over Stoney 21 Creek, Bridge Replacement 110,000 22 (Base Construction Allocation - 23 $88,000) 24 (Land Allocation - $11,000) 25 (Design and Contingencies - $11,000) 26 (3) Sheffield Township, T-540 over Two 27 Mile Run, Bridge Replacement 318,000 28 (Base Construction Allocation - 29 $254,000) 30 (Land Allocation - $32,000) 19920S1746B2236 - 193 -
1 (Design and Contingencies - $32,000) 2 (4) Southwest Township, T-306 on Mt. Hope 3 Road over Pine Creek, Bridge 4 Replacement 207,000 5 (Base Construction Allocation - 6 $165,000) 7 (Land Allocation - $21,000) 8 (Design and Contingencies - $21,000) 9 (5) Spring Creek Township, T-322 over East 10 Branch of Spring Creek, Bridge 11 Replacement 207,000 12 (Base Construction Allocation - 13 $165,000) 14 (Land Allocation - $21,000) 15 (Design and Contingencies - $21,000) 16 (6) Southwest Township, T-313 on Swede 17 Road over Pine Creek, Bridge 18 Replacement 109,000 19 (Base Construction Allocation - 20 $87,000) 21 (Land Allocation - $11,000) 22 (Design and Contingencies - $11,000) 23 (7) Sheffield Township, T-311 over 24 Caldwell Creek, Bridge Replacement 210,000 25 (Base Construction Allocation - 26 $168,000) 27 (Land Allocation - $21,000) 28 (Design and Contingencies - $21,000) 29 (8) Southwest Township, T-309 over Pine 30 Creek, Bridge Replacement 124,000 19920S1746B2236 - 194 -
1 (Base Construction Allocation - 2 $100,000) 3 (Land Allocation - $12,000) 4 (Design and Contingencies - $12,000) 5 (9) Spring Creek Township, T-395 over 6 Hosmer Run, Bridge Replacement 207,000 7 (Base Construction Allocation - 8 $165,000) 9 (Land Allocation - $21,000) 10 (Design and Contingencies - $21,000) 11 (10) Columbus Township, T-340 on Lacy Road 12 over Hare Creek, Bridge Replacement 166,000 13 (Base Construction Allocation - 14 $132,000) 15 (Land Allocation - $17,000) 16 (Design and Contingencies - $17,000) 17 (11) Columbus Township, T-350 on 18 Alterbottom over Tamarock Swamp 19 Tributary, Bridge Replacement 84,000 20 (Base Construction Allocation - 21 $68,000) 22 (Land Allocation - $8,000) 23 (Design and Contingencies - $8,000) 24 (12) Spring Creek Township, T-425 over 25 Spring Creek, Bridge Replacement 161,000 26 (Base Construction Allocation - 27 $129,000) 28 (Land Allocation - $16,000) 29 (Design and Contingencies - $16,000) 30 (13) Brokenstraw Township, T-444 on Irvine 19920S1746B2236 - 195 -
1 Run Road over Irvine Run, Bridge 2 Replacement 110,000 3 (Base Construction Allocation - 4 $88,000) 5 (Land Allocation - $11,000) 6 (Design and Contingencies - $11,000) 7 (14) Eldred Township, T-355 on Glossville 8 Road over Caldwell Creek, Bridge 9 Replacement 119,000 10 (Base Construction Allocation - 11 $95,000) 12 (Land Allocation - $12,000) 13 (Design and Contingencies - $12,000) 14 (15) Eldred Township, T-355 on Eureka Road 15 over Caldwell Creek, Bridge 16 Replacement 151,000 17 (Base Construction Allocation - 18 $121,000) 19 (Land Allocation - $15,000) 20 (Design and Contingencies - $15,000) 21 (16) Columbia Township, T-639 on Stewart 22 Road over Winton Run, Bridge 23 Replacement 144,000 24 (Base Construction Allocation - 25 $116,000) 26 (Land Allocation - $14,000) 27 (Design and Contingencies - $14,000) 28 (17) Freehold Township, T-406 on Huntley 29 Road over Mill Creek, Bridge 30 Replacement 157,000 19920S1746B2236 - 196 -
1 (Base Construction Allocation - 2 $125,000) 3 (Land Allocation - $16,000) 4 (Design and Contingencies - $16,000) 5 (18) Sugar Grove Township, T-539 over 6 Steelwater Creek, Bridge Replacement 122,000 7 (Base Construction Allocation - 8 $98,000) 9 (Land Allocation - $12,000) 10 (Design and Contingencies - $12,000) 11 (19) Sugar Grove Township, T-587 on Creek 12 Road over Sonders Run, Bridge 13 Replacement 122,000 14 (Base Construction Allocation - 15 $98,000) 16 (Land Allocation - $12,000) 17 (Design and Contingencies - $12,000) 18 (20) Tidioute Borough, First Street over 19 McGuire Run, Bridge Replacement 138,000 20 (Base Construction Allocation - 21 $110,000) 22 (Land Allocation - $14,000) 23 (Design and Contingencies - $14,000) 24 (21) Tidioute Borough, Grant Street over 25 Tidioute Creek, Bridge Replacement 130,000 26 (Base Construction Allocation - 27 $104,000) 28 (Land Allocation - $13,000) 29 (Design and Contingencies - $13,000) 30 (22) Sugar Grove Township, T-452 on Deer 19920S1746B2236 - 197 -
1 Run Road over Patchen Run, Bridge 2 Replacement 140,000 3 (Base Construction Allocation - 4 $112,000) 5 (Land Allocation - $14,000) 6 (Design and Contingencies - $14,000) 7 (b) State Bridges 8 (1) S.R.0957 over Stillwater Creek, Sugar 9 Grove Township, Bridge Replacement 350,000 10 (Base Construction Allocation - 11 $300,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $30,000) 14 (2) S.R.3005 on Hickory Street over 15 Allegheny Run, Warren Borough, Bridge 16 Rehabilitation 2,000,000 17 (Base Construction Allocation - 18 $1,850,000) 19 (Land Allocation - $50,000) 20 (Design and Contingencies - $100,000) 21 (3) S.R.3010 over Whitney Run, Spring 22 Creek Township, Bridge Replacement 440,000 23 (Base Construction Allocation - 24 $390,000) 25 (Land Allocation - $20,000) 26 (Design and Contingencies - $30,000) 27 (4) S.R.0127 over Gordon Run, Triumph 28 Township, Bridge Replacement 300,000 29 (Base Construction Allocation - 30 $250,000) 19920S1746B2236 - 198 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $30,000) 3 (5) S.R.0027 over Hosmer Creek, Pittsfield 4 Township, Bridge Replacement 560,000 5 (Base Construction Allocation - 6 $480,000) 7 (Land Allocation - $30,000) 8 (Design and Contingencies - $50,000) 9 (6) S.R.3010 over Brokenstraw Creek, 10 Spring Creek Township, Bridge 11 Replacement 1,450,000 12 (Base Construction Allocation - 13 $1,200,000) 14 (Land Allocation - $50,000) 15 (Design and Contingencies - $200,000) 16 (7) S.R.3014 on Cole Hill Road over 17 Brokenstraw Creek, Pittsfield Township, 18 Bridge Replacement 600,000 19 (Base Construction Allocation - 20 $520,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $70,000) 23 (8) S.R.3022 over Irvine Run, Brokenstraw 24 Township, Bridge Replacement 630,000 25 (Base Construction Allocation - 26 $500,000) 27 (Land Allocation - $30,000) 28 (Design and Contingencies - $100,000) 29 (9) S.R.0059, T.R.59, Devils Elbow Bridge 30 over Jakes Run, Mead Township, Bridge 19920S1746B2236 - 199 -
1 Rehabilitation 2,000,000 2 (Base Construction Allocation - 3 $1,830,000) 4 (Land Allocation - $20,000) 5 (Design and Contingencies - $150,000) 6 (10) S.R.0069 on Jackson Road over Jackson 7 Run, Conewango Township, Bridge 8 Replacement 330,000 9 (Base Construction Allocation - 10 $281,000) 11 (Land Allocation - $17,000) 12 (Design and Contingencies - $32,000) 13 (11) S.R.0069 on Jackson Road over Jackson 14 Run, Conewango Township, Bridge 15 Replacement 320,000 16 (Base Construction Allocation - 17 $272,000) 18 (Land Allocation - $16,000) 19 (Design and Contingencies - $32,000) 20 (12) S.R.0958 over Little Brokenstraw 21 Creek, Freehold Township, Bridge 22 Replacement 240,000 23 (Base Construction Allocation - 24 $204,000) 25 (Land Allocation - $12,000) 26 (Design and Contingencies - $24,000) 27 (13) S.R.2010 Brown Run Road over Browns 28 Run, Mead Township, Bridge Replacement 320,000 29 (Base Construction Allocation - 30 $272,000) 19920S1746B2236 - 200 -
1 (Land Allocation - $16,000) 2 (Design and Contingencies - $32,000) 3 (14) S.R.0006 in Village of Saybrook over 4 Four Mile Run, Sheffield Township, 5 Bridge Replacement 451,000 6 (Base Construction Allocation - 7 $383,000) 8 (Land Allocation - $23,000) 9 (Design and Contingencies - $45,000) 10 Section 67. Washington County. 11 (a) Local Bridges 12 (1) Cecil Township, Segment 0130 Offset 13 2811, Bridge Replacement 250,000 14 (Base Construction Allocation - 15 $250,000) 16 (2) Cecil Township, Segment 0080 Offset 17 1384, Bridge Replacement 60,000 18 (Base Construction Allocation - 19 $60,000) 20 (3) Cross Creek Township, Segment 0020 21 Offset 0027, Bridge Replacement 500,000 22 (Base Construction Allocation - 23 $500,000) 24 (4) Canonsburg Borough, South Central 25 Avenue over Branch of Chartiers Creek, 26 Bridge Replacement 1,000,000 27 (Base Construction Allocation - 28 $1,000,000) 29 (5) Donegal Township, Segment 0080 Offset 30 0039, Bridge Replacement 325,000 19920S1746B2236 - 201 -
1 (Base Construction Allocation - 2 $325,000) 3 (6) Cross Creek Township, T-433, Parker 4 Road Bridge over Middle Fork Creek, 5 Bridge Replacement 73,000 6 (Base Construction Allocation - 7 $67,000) 8 (Design and Contingencies - $6,000) 9 (b) State Bridges 10 (1) S.R.0040, Lane-Bane Bridge over 11 Monongahela River, West Brownsville 12 Borough, Bridge Rehabilitation 6,805,000 13 (Base Construction Allocation - 14 $6,000,000) 15 (Land Allocation - $5,000) 16 (Design and Contingencies - $800,000) 17 (2) S.R.0136, Beau Street Bridge over I- 18 70, East Washington Borough, Bridge 19 Rehabilitation 1,266,000 20 (Base Construction Allocation - 21 $1,142,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $114,000) 24 (3) S.R.0231, Templeton Bridge over Branch 25 of Templeton's Fork, East Finley 26 Township, Bridge Replacement 250,000 27 (Base Construction Allocation - 28 $200,000) 29 (Land Allocation - $20,000) 30 (Design and Contingencies - $30,000) 19920S1746B2236 - 202 -
1 (4) S.R.0917, Saw Mill Run Bridge over 2 Branch of Saw Mill Run, Fallowfield 3 Township, Bridge Replacement 275,000 4 (Base Construction Allocation - 5 $225,000) 6 (Land Allocation - $20,000) 7 (Design and Contingencies - $30,000) 8 (5) S.R.0980, Canonsburg Bridge No.1 over 9 Chartiers Creek, Canonsburg Borough, 10 Bridge Replacement 1,010,000 11 (Base Construction Allocation - 12 $885,000) 13 (Land Allocation - $40,000) 14 (Design and Contingencies - $85,000) 15 (6) S.R.0980, Canonsburg Bridge No.2 over 16 Bridge of Chartiers Creek, Canonsburg 17 Borough, Bridge Replacement 590,000 18 (Base Construction Allocation - 19 $500,000) 20 (Land Allocation - $40,000) 21 (Design and Contingencies - $50,000) 22 (7) S.R.1087, Crookham Bridge over Mingo 23 Creek, Carroll Township, Bridge 24 Replacement 190,000 25 (Base Construction Allocation - 26 $159,000) 27 (Land Allocation - $15,000) 28 (Design and Contingencies - $16,000) 29 (8) S.R.2037, Westside Bridge over 30 Westside Creek, Fallowfield Township, 19920S1746B2236 - 203 -
1 Bridge Replacement 84,000 2 (Base Construction Allocation - 3 $66,000) 4 (Land Allocation - $11,000) 5 (Design and Contingencies - $7,000) 6 (9) S.R.4004, Raccoon Creek Bridge over 7 Raccoon Creek, Hanover and Smith 8 Townships, Bridge Replacement 750,000 9 (Base Construction Allocation - 10 $650,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $80,000) 13 (10) S.R.4037, Robinson Run Bridge over 14 Branch of Robinson Run, Robinson 15 Township, Bridge Replacement 400,000 16 (Base Construction Allocation - 17 $345,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $35,000) 20 (11) S.R.1002, Segment 0100 Offset 1284, 21 Peters Township, Bridge Replacement 750,000 22 (Base Construction Allocation - 23 $750,000) 24 (12) S.R.2041 over Branch of Pike Run, 25 West Pike Run Township, Bridge 26 Replacement 500,000 27 (Base Construction Allocation - 28 $500,000) 29 (13) S.R.4018, Cross Creek Bridge East of 30 Avella, Bridge Replacement 350,000 19920S1746B2236 - 204 -
1 (Base Construction Allocation - 2 $350,000) 3 (14) S.R.3023 over LR798, Donegal 4 Township, Bridge Replacement 750,000 5 (Base Construction Allocation - 6 $750,000) 7 (15) S.R.1010 over Brush Run, Peters 8 Township, Bridge Replacement 750,000 9 (Base Construction Allocation - 10 $750,000) 11 (16) S.R.0519, Segment 0150 Offset 0921, 12 North Strabane Township, Bridge 13 Replacement 1,500,000 14 (Base Construction Allocation - 15 $1,500,000) 16 Section 68. Wayne County. 17 (a) Local Bridges 18 (1) Buckingham Township, T-603, Bridge 19 No.5 over Equinunk Creek (Factory), 20 Bridge Replacement 281,000 21 (Base Construction Allocation - 22 $250,000) 23 (Land Allocation - $1,000) 24 (Design and Contingencies - $30,000) 25 (2) Damascus Township, T-508, Bridge No.9 26 over South Branch of Calkins Creek 27 (Boyd's Mills), Bridge Replacement 132,000 28 (Base Construction Allocation - 29 $110,000) 30 (Land Allocation - $2,000) 19920S1746B2236 - 205 -
1 (Design and Contingencies - $20,000) 2 (3) Damascus Township, T-677, Bridge No.10 3 over North Branch of Calkins Creek 4 (High Bridge), Bridge Replacement 122,000 5 (Base Construction Allocation - 6 $100,000) 7 (Land Allocation - $2,000) 8 (Design and Contingencies - $20,000) 9 (4) Damascus Township, T-636, Bridge No.11 10 over North Branch of Calkins Creek 11 (Bishoff), Bridge Replacement 220,000 12 (Base Construction Allocation - 13 $180,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $30,000) 16 (5) Preston Township, T-682, Bridge No.30 17 over Equinunk Creek (Dolans), Bridge 18 Replacement 172,000 19 (Base Construction Allocation - 20 $150,000) 21 (Land Allocation - $2,000) 22 (Design and Contingencies - $20,000) 23 (6) Preston Township, T-684, Bridge No.31 24 over Equinunk Creek (Williams), Bridge 25 Replacement 209,000 26 (Base Construction Allocation - 27 $180,000) 28 (Land Allocation - $4,000) 29 (Design and Contingencies - $25,000) 30 (7) Prompton Borough, T-444, Bridge No.32 19920S1746B2236 - 206 -
1 over Van Auken Creek, Bridge 2 Replacement 180,000 3 (Base Construction Allocation - 4 $150,000) 5 (Land Allocation - $5,000) 6 (Design and Contingencies - $25,000) 7 (b) State Bridges 8 (1) S.R.1016 Bridge over Hollister Creek, 9 Damascus Township, Bridge Replacement 415,000 10 (Base Construction Allocation - 11 $360,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $45,000) 14 (2) S.R.0191 over Dyberry Creek, Dyberry 15 Township, Bridge Replacement 570,000 16 (Base Construction Allocation - 17 $500,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $60,000) 20 (3) S.R.0006 Bridge over Lackawaxen River, 21 Hawley Borough, Bridge Replacement 2,395,000 22 (Base Construction Allocation - 23 $2,120,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $255,000) 26 (4) S.R.4043 Bridge over Branch of Sherman 27 Creek, Scott Township, Bridge 28 Replacement 469,000 29 (Base Construction Allocation - 30 $410,000) 19920S1746B2236 - 207 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $49,000) 3 (5) S.R.4023, Bridge No.2 over West Branch 4 of Lackawaxen River, Mount Pleasant 5 Township, Bridge Replacement 410,000 6 (Base Construction Allocation - 7 $358,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $42,000) 10 (6) S.R.4037 Bridge over Oquaga Creek, 11 Scott Township, Bridge Replacement 805,000 12 (Base Construction Allocation - 13 $710,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $85,000) 16 (7) S.R.1002 over Delaware River, Damascus 17 Township, Bridge Replacement 3,410,000 18 (Base Construction Allocation - 19 $3,000,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $400,000) 22 (8) S.R.0191 over Delaware River, 23 Buckingham Township, Bridge 24 Replacement 1,240,000 25 (Base Construction Allocation - 26 $1,100,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $130,000) 29 (9) S.R.4023 Bridge over West Branch of 30 Lackawaxen River, Mount Pleasant 19920S1746B2236 - 208 -
1 Township, Bridge Replacement 410,000 2 (Base Construction Allocation - 3 $358,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $42,000) 6 (10) S.R.4008 Bridge over Johnson Creek, 7 Mount Pleasant Township, Bridge 8 Replacement 395,000 9 (Base Construction Allocation - 10 $344,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $41,000) 13 (11) S.R.0296 Bridge over Branch of Middle 14 Creek, 15 Canaan Township, Bridge Replacement 420,000 16 (Base Construction Allocation - 17 $365,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $45,000) 20 (12) S.R.0296 Bridge over Branch of 21 Lackawaxen River, Clinton Township, 22 Bridge Replacement 585,000 23 (Base Construction Allocation - 24 $515,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $60,000) 27 (13) S.R.0196 Bridge over Middle Creek, 28 Lake Township, Bridge Replacement 1,018,000 29 (Base Construction Allocation - 30 $900,000) 19920S1746B2236 - 209 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $108,000) 3 (14) S.R.0191 Bridge over Shehawken Creek, 4 Buckingham Township, Bridge 5 Replacement 816,000 6 (Base Construction Allocation - 7 $720,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $86,000) 10 (15) S.R.0191 Bridge over Branch of 11 Wallenpaupack Creek, Dreher Township, 12 Bridge Replacement 402,000 13 (Base Construction Allocation - 14 $350,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $42,000) 17 (16) S.R.0507 Bridge over Wallenpaupack 18 Creek, Dreher Township, Bridge 19 Replacement 710,000 20 (Base Construction Allocation - 21 $625,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $75,000) 24 (17) S.R.1023 Bridge over South Branch 25 Equinunk Creek, Manchester Township, 26 Bridge Replacement 402,000 27 (Base Construction Allocation - 28 $350,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $42,000) 19920S1746B2236 - 210 -
1 (18) S.R.4007 Bridge over Crooked Creek, 2 Buckingham Township, Bridge 3 Replacement 458,000 4 (Base Construction Allocation - 5 $400,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $48,000) 8 (19) S.R.4007 Bridge over Equinunk Creek, 9 Manchester Township, Bridge 10 Replacement 660,000 11 (Base Construction Allocation - 12 $580,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $70,000) 15 (20) S.R.3046 Bridge over Spring Run, 16 Dreher Township, Bridge Replacement 346,000 17 (Base Construction Allocation - 18 $300,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $36,000) 21 (21) S.R.3002 Bridge over Stevens Creek, 22 Sterling Township, Bridge Replacement 503,000 23 (Base Construction Allocation - 24 $440,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $53,000) 27 (22) S.R.2007 Bridge over Carley Brook, 28 Honesdale Borough, Bridge Replacement 462,000 29 (Base Construction Allocation - 30 $404,000) 19920S1746B2236 - 211 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $48,000) 3 Section 69. Westmoreland County. 4 (a) Local Bridges 5 (1) Latrobe Borough, Loyalhanna Street 6 Bridge over Conrail and S.R.9900, 7 Bridge Replacement 450,000 8 (Base Construction Allocation - 9 $400,000) 10 (Land Allocation - $50,000) 11 (2) Hempfield Township, T-471, Bridge on 12 Lash Road, Bridge Replacement 518,000 13 (Base Construction Allocation - 14 $450,000) 15 (Design and Contingencies - $68,000) 16 (3) Sewickley Township, T-623 over 17 Tributary of Little Sewickley Creek, 18 Bridge Replacement 130,000 19 (Base Construction Allocation - 20 $100,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $20,000) 23 (4) Hempfield Township, T-398, Old Route 24 No.30, Bridge Replacement 530,000 25 (Base Construction Allocation - 26 $400,000) 27 (Land Allocation - $40,000) 28 (Design and Contingencies - $90,000) 29 (5) Hempfield Township, T-865, Old Airport 30 Road Hill Bridge, Bridge Replacement 630,000 19920S1746B2236 - 212 -
1 (Base Construction Allocation - 2 $500,000) 3 (Land Allocation - $30,000) 4 (Design and Contingencies - $100,000) 5 (6) Hempfield Township, T-987, Brookdale 6 Bridge, Bridge Replacement 550,000 7 (Base Construction Allocation - 8 $450,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $90,000) 11 (7) City of Greensburg, Laird Street 12 Bridge, Bridge Replacement 235,000 13 (Base Construction Allocation - 14 $200,000) 15 (Land Allocation - $5,000) 16 (Design and Contingencies - $30,000) 17 (8) Murrysville Borough and Washington 18 Township, Ludwig Road Bridge No.39, 19 Bridge Replacement 190,000 20 (Base Construction Allocation - 21 $150,000) 22 (Land Allocation - $5,000) 23 (Design and Contingencies - $35,000) 24 (9) Sewickley Township, T-398 Bridge over 25 Little Sewickley Creek, Bridge 26 Replacement 703,000 27 (Base Construction Allocation - 28 $630,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $63,000) 19920S1746B2236 - 213 -
1 (10) Murrysville and Delmont Boroughs, Old 2 William Penn Highway Bridge E11, Bridge 3 Replacement 185,000 4 (Base Construction Allocation - 5 $150,000) 6 (Design and Contingencies - $35,000) 7 (11) Murrysville Borough, Kemerer Road 8 Bridge No.20 over Branch of Steels Run, 9 Bridge Replacement 95,000 10 (Base Construction Allocation - 11 $75,000) 12 (Design and Contingencies - $20,000) 13 (12) Youngwood Borough, Hillis Street 14 Bridge No.64, Bridge Replacement 265,000 15 (Base Construction Allocation - 16 $233,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $22,000) 19 (13) Youngwood Borough, Depot Street 20 Bridge, Bridge Replacement 545,000 21 (Base Construction Allocation - 22 $475,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $60,000) 25 (14) Hempfield Township, T-398, Old Route 26 30 Bridge, Bridge Replacement 230,000 27 (Base Construction Allocation - 28 $200,000) 29 (Design and Contingencies - $30,000) 30 (15) Hempfield Township, T-470, Ladysmith 19920S1746B2236 - 214 -
1 Road Bridge, Bridge Replacement 690,000 2 (Base Construction Allocation - 3 $600,000) 4 (Design and Contingencies - $90,000) 5 (16) Hempfield Township, T-748, Sweitzer 6 Road Bridge, Bridge Replacement 920,000 7 (Base Construction Allocation - 8 $800,000) 9 (Design and Contingencies - $120,000) 10 (17) Hempfield Township, T-474, Whigham 11 Road Bridge, Bridge Replacement 576,000 12 (Base Construction Allocation - 13 $500,000) 14 (Land Allocation - $1,000) 15 (Design and Contingencies - $75,000) 16 (18) Hempfield Township, T-655, Rocky 17 Mountain Bridge, Bridge Replacement 518,000 18 (Base Construction Allocation - 19 $450,000) 20 (Design and Contingencies - $68,000) 21 (19) Hempfield Township, T-792, Pore Road 22 Bridge, Bridge Replacement 230,000 23 (Base Construction Allocation - 24 $200,000) 25 (Design and Contingencies - $30,000) 26 (20) Hempfield Township, T-865, Airport 27 Hill Road Bridge, Bridge Replacement 575,000 28 (Base Construction Allocation - 29 $500,000) 30 (Design and Contingencies - $75,000) 19920S1746B2236 - 215 -
1 (21) Hempfield Township, T-987, Brookdale 2 Drive Bridge, Bridge Replacement 518,000 3 (Base Construction Allocation - 4 $450,000) 5 (Design and Contingencies - $68,000) 6 (22) New bridge spanning Allegheny River 7 to connect S.R.0028 and S.R.0366, 8 Bridge Replacement 131,500,000 9 (23) City of New Kensington, Locust Street 10 Viaduct, Bridge Replacement 1,500,000 11 (Base Construction Allocation - 12 $1,500,000) 13 (24) City of Lower Burrell, Edgecliff Road 14 Bridge, Bridge Replacement 225,000 15 (Base Construction Allocation - 16 $225,000) 17 (25) North Huntington Township, Bratkovich 18 Road Bridge, Bridge Replacement 9,152,000 19 (Base Construction Allocation - 20 $9,152,000) 21 (26) North Huntington Township, Long Run 22 Bridge over Long Run, Bridge 23 Replacement 46,000 24 (Base Construction Allocation - 25 $32,000) 26 (Land Allocation - $11,000) 27 (Design and Contingencies - $3,000) 28 (27) Wallace Avenue Bridge, Bridge 29 Replacement 22,000 30 (Base Construction Allocation - 19920S1746B2236 - 216 -
1 $12,000) 2 (Design and Contingencies - $10,000) 3 (28) North Huntington Township, McCavett 4 Road Bridge over Conrail, Bridge 5 Replacement 1,115,000 6 (Base Construction Allocation - 7 $1,015,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $90,000) 10 (29) City of New Kensington, Bridge No.1, 11 Locust Street, Bridge Replacement 30,000 12 (Base Construction Allocation - 13 $30,000) 14 (30) City of New Kensington, Fourth Street 15 Bridge No.2 over Little Pucketa Creek, 16 Bridge Construction 16,000 17 (Base Construction Allocation - 18 $16,000) 19 (31) City of New Kensington, Fourth Street 20 Bridge No.2, Bridge Replacement 29,000 21 (Base Construction Allocation - 22 $29,000) 23 (32) City of New Kensington, Locust Street 24 Bridge No.1 over Conrail Railroad, 25 Bridge Construction 65,000 26 (Base Construction Allocation - 27 $65,000) 28 (33) Upper Burrell Township, Hartge Road 29 over Little Pucketa Creek, Bridge 30 Replacement 110,000 19920S1746B2236 - 217 -
1 (Base Construction Allocation - 2 $100,000) 3 (Design and Contingencies - $10,000) 4 (b) State Bridges 5 (1) S.R.0056, Seward Bridge over Railroad 6 and Borough Road, St. Clair Township, 7 Bridge Replacement 2,650,000 8 (Base Construction Allocation - 9 $2,385,000) 10 (Land Allocation - $40,000) 11 (Design and Contingencies - $225,000) 12 (2) S.R.0070 Bridge over S.R.3005 near 13 Pricedale, Rostraver Township, Bridge 14 Rehabilitation 1,405,000 15 (Base Construction Allocation - 16 $1,250,000) 17 (Design and Contingencies - $155,000) 18 (3) S.R.0070 Bridge over S.R.3003 near 19 Speers Run, Rostraver Township, Bridge 20 Rehabilitation 3,424,000 21 (Base Construction Allocation - 22 $3,140,000) 23 (Design and Contingencies - $284,000) 24 (4) S.R.0259, Snyders Run Bridge over 25 Branch of Snyders Run, Fairfield 26 Township, Bridge Replacement 375,000 27 (Base Construction Allocation - 28 $315,000) 29 (Land Allocation - $30,000) 30 (Design and Contingencies - $30,000) 19920S1746B2236 - 218 -
1 (5) S.R.0259, Conrail Bolivar Underpass 2 No.2 over S.R.0259, Bolivar Borough and 3 Fairfield Township, Bridge Replacement 460,000 4 (Base Construction Allocation - 5 $350,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $100,000) 8 (6) S.R.0711, Koffer Run Bridge over 9 Koffer Run, Ligonier Township, Bridge 10 Replacement 350,000 11 (Base Construction Allocation - 12 $300,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $30,000) 15 (7) S.R.1019, Hanna's Run Bridge over 16 Branch of Hanna's Run, Ligonier 17 Township, Bridge Replacement 350,000 18 (Base Construction Allocation - 19 $300,000) 20 (Land Allocation - $20,000) 21 (Design and Contingencies - $30,000) 22 (8) S.R.1028, Luxor Bridge over Little 23 Crabtree Creek, Hempfield Township, 24 Bridge Replacement 350,000 25 (Base Construction Allocation - 26 $300,000) 27 (Land Allocation - $20,000) 28 (Design and Contingencies - $30,000) 29 (9) S.R.1071, Hendricks Creek Bridge and 30 Approach, T-987, Bridge Replacement 270,000 19920S1746B2236 - 219 -
1 (Base Construction Allocation - 2 $240,000) 3 (Land Allocation - $5,000) 4 (Design and Contingencies - $25,000) 5 (10) S.R.3003, Speers Run Bridge over 6 Speers Run, Rostraver Township, Bridge 7 Replacement 475,000 8 (Base Construction Allocation - 9 $415,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $40,000) 12 (11) S.R.3022 Bridge over Small Stream, 13 North Huntingdon Township, Bridge 14 Replacement 425,000 15 (Base Construction Allocation - 16 $370,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $35,000) 19 (12) S.R.4024, Boquet Bridge over Brush 20 Run, Penn Township, Bridge Replacement 297,000 21 (Base Construction Allocation - 22 $263,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $24,000) 25 (13) S.R.0070, I-70 Bridge over Sewickley 26 Creek, Sewickley Township, Bridge 27 Rehabilitation 660,000 28 (Base Construction Allocation - 29 $600,000) 30 (Design and Contingencies - $60,000) 19920S1746B2236 - 220 -
1 (14) S.R.4075 over Chartiers Run, Upper 2 Burrell Township, Bridge Replacement 110,000 3 (Base Construction Allocation - 4 $50,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $50,000) 7 (15) S.R.4036 over Pucketa Creek, Upper 8 Burrell Township, Bridge Replacement 420,000 9 (Base Construction Allocation - 10 $350,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $50,000) 13 (16) S.R.4032 Bridge over Pucketa Creek, 14 Upper Burrell Township, Bridge 15 Replacement 135,000 16 (Base Construction Allocation - 17 $75,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $50,000) 20 (17) S.R.4075 over Chartiers Run, Upper 21 Burrell Township, Bridge Replacement 110,000 22 (Base Construction Allocation - 23 $50,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $50,000) 26 (18) S.R.0366 over Little Pucketa Creek, 27 City of New Kensington, Bridge 28 Replacement 470,000 29 (Base Construction Allocation - 30 $400,000) 19920S1746B2236 - 221 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $50,000) 3 (19) S.R.0056 over Little Pucketa Creek, 4 City of New Kensington, Bridge 5 Replacement 160,000 6 (Base Construction Allocation - 7 $100,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $50,000) 10 (20) S.R.0056 Bridge over Branch of 11 Pucketa Creek, City of Lower Burrell, 12 Bridge Replacement 110,000 13 (Base Construction Allocation - 14 $50,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $50,000) 17 (21) S.R.0366 over Pucketa Creek, City of 18 Lower Burrell, Bridge Replacement 110,000 19 (Base Construction Allocation - 20 $50,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $50,000) 23 (22) S.R.3012, Sewickley Bridge over Big 24 Sewickley Creek, South Huntington 25 Township, Bridge Replacement 51,000 26 (Base Construction Allocation - 27 $36,000) 28 (Land Allocation - $11,000) 29 (Design and Contingencies - $4,000) 30 (23) S.R.2033, Mansville Bridge over 19920S1746B2236 - 222 -
1 Keefer Run, Cook Township, Bridge 2 Replacement 59,000 3 (Base Construction Allocation - 4 $44,000) 5 (Land Allocation - $11,000) 6 (Design and Contingencies - $4,000) 7 (24) S.R.0982, Bradenville Bridge over 8 Saxmore Run, Derry Township, Bridge 9 Replacement 446,000 10 (Base Construction Allocation - 11 $385,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $41,000) 14 (25) S.R.1028, Luxor Bridge, Hempfield 15 Township, Bridge Replacement 350,000 16 (Base Construction Allocation - 17 $300,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $30,000) 20 (26) S.R.0981, Smithton Bridge over Barron 21 Run, South Huntington Township, Bridge 22 Replacement 196,000 23 (Base Construction Allocation - 24 $159,000) 25 (Land Allocation - $12,000) 26 (Design and Contingencies - $25,000) 27 (27) S.R.0217, Miller Run Bridge, Derry 28 Township, Bridge Replacement 220,000 29 (Base Construction Allocation - 30 $180,000) 19920S1746B2236 - 223 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $30,000) 3 Section 70. Wyoming County. 4 (a) Local Bridges (Reserved) 5 (b) State Bridges 6 (1) S.R.2021 Bridge over Branch of Beaver 7 Creek, Falls Township, Bridge 8 Replacement 783,000 9 (Base Construction Allocation - 10 $690,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $83,000) 13 (2) S.R.2012 Bridge over Branch of 14 Tunkhannock Creek, Clinton Township, 15 Bridge Replacement 884,000 16 (Base Construction Allocation - 17 $780,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $94,000) 20 (3) S.R.2002 Bridge over Whitelock Creek, 21 Exeter Township, Bridge Replacement 654,000 22 (Base Construction Allocation - 23 $575,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $69,000) 26 (4) S.R.3007 Bridge over Railroad, 27 Washington Township, Bridge 28 Replacement 915,000 29 (Base Construction Allocation - 30 $808,000) 19920S1746B2236 - 224 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $97,000) 3 (5) S.R.1025 Bridge over Conrail Railroad, 4 Nicholson Borough, Bridge Replacement 783,000 5 (Base Construction Allocation - 6 $690,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $83,000) 9 (6) S.R.2027 Bridge over Beaver Creek, 10 Falls Township, Bridge Replacement 404,000 11 (Base Construction Allocation - 12 $352,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $42,000) 15 (7) S.R.0011 over T.R.6, Clinton Township, 16 Bridge Replacement 1,240,000 17 (Base Construction Allocation - 18 $1,100,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $130,000) 21 (8) S.R.0006 over Tuscarora Creek, 22 Braintrim Township, Bridge Replacement 1,910,000 23 (Base Construction Allocation - 24 $1,700,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $200,000) 27 (9) S.R.1014 Bridge over Lake Sheridan 28 Outlet, Nicholson Township, Bridge 29 Replacement 390,000 30 (Base Construction Allocation - 19920S1746B2236 - 225 -
1 $340,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $40,000) 4 (10) S.R.0087 Bridge over Susquehanna 5 River, Mehoopany Township, Bridge 6 Replacement 5,210,000 7 (Base Construction Allocation - 8 $4,700,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $500,000) 11 (11) S.R.0029 Bridge over Bowman's Creek, 12 Noxen Township, Bridge Replacement 732,000 13 (Base Construction Allocation - 14 $645,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $77,000) 17 (12) S.R.2039 Bridge over Beaver Run 18 Creek, Noxen Township, Bridge 19 Replacement 738,000 20 (Base Construction Allocation - 21 $650,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $78,000) 24 (13) S.R.3001 Bridge over Little Mehoopany 25 Creek, Windham Township, Bridge 26 Replacement 486,000 27 (Base Construction Allocation - 28 $425,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $51,000) 19920S1746B2236 - 226 -
1 (14) S.R.3002 Bridge over Bowman's Creek, 2 Noxen Township, Bridge Replacement 928,000 3 (Base Construction Allocation - 4 $820,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $98,000) 7 (15) S.R.0029 Bridge over Swail Brook, 8 Tunkhannock Borough, Bridge 9 Replacement 540,000 10 (Base Construction Allocation - 11 $473,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $57,000) 14 (16) S.R.0092 Bridge over Field Brook, 15 Nicholson Township, Bridge Replacement 520,000 16 (Base Construction Allocation - 17 $455,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $55,000) 20 (17) S.R.0307 Bridge over Buttermilk 21 Creek, Falls Township, Bridge 22 Replacement 592,000 23 (Base Construction Allocation - 24 $520,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $62,000) 27 (18) S.R.0307 Bridge over Beaver Creek, 28 Falls Township, Bridge Replacement 1,208,000 29 (Base Construction Allocation - 30 $1,070,000) 19920S1746B2236 - 227 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $128,000) 3 (19) S.R.0307 Bridge over Buttermilk 4 Creek, Falls Township, Bridge 5 Replacement 682,000 6 (Base Construction Allocation - 7 $600,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $72,000) 10 (20) S.R.1009 Bridge over Meshoppen Creek, 11 Lemon Township, Bridge Replacement 794,000 12 (Base Construction Allocation - 13 $700,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $84,000) 16 (21) S.R.0006, Segment 0490 Offset 0000, 17 Bardwell Bridge over Tunkhannock Creek, 18 Tunkhannock Township, Bridge 19 Replacement 2,260,000 20 (Base Construction Allocation - 21 $2,000,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $250,000) 24 (22) S.R.0006, Segment 0560 Offset 0866, 25 Bridge over S.R.1017, Clinton Township, 26 Bridge Replacement 700,000 27 (Base Construction Allocation - 28 $620,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $70,000) 19920S1746B2236 - 228 -
1 (23) S.R.0117 Segment 0020 Offset 1773, 2 Bridge over Outlet of Lake Sheridan, 3 Factoryville Borough, Bridge 4 Replacement 280,000 5 (Base Construction Allocation - 6 $240,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $30,000) 9 Section 71. York County. 10 (a) Local Bridges 11 (1) Penn Township, Frederick Street Bridge 12 over Plum Creek, Bridge Replacement 250,000 13 (Base Construction Allocation - 14 $200,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $40,000) 17 (2) City of York, North Beaver Street 18 Bridge over Willis Run, Bridge 19 Replacement 362,000 20 (Base Construction Allocation - 21 $300,000) 22 (Land Allocation - $12,000) 23 (Design and Contingencies - $50,000) 24 (3) City of York, North Pershing Avenue 25 Bridge over Willis Run, Bridge 26 Replacement 338,000 27 (Base Construction Allocation - 28 $288,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $40,000) 19920S1746B2236 - 229 -
1 (4) City of York, North Newberry Street 2 Bridge over Willis Run Bridge 3 Replacement 360,000 4 (Base Construction Allocation - 5 $300,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $50,000) 8 (5) City of York, Smith Street Bridge over 9 Willis Run, Bridge Replacement 338,000 10 (Base Construction Allocation - 11 $288,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $40,000) 14 (6) New Freedom Borough, County Bridge on 15 Singer Road over County Railroad and 16 Trail, Bridge Replacement 325,000 17 (Base Construction Allocation - 18 $250,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $65,000) 21 (b) State Bridges 22 (1) S.R.0295, Susquehanna Trail over 23 Conewago Creek, Conewago and Newberry 24 Townships, Bridge Replacement 6,260,000 25 (Base Construction Allocation - 26 $5,400,000) 27 (Land Allocation - $50,000) 28 (Design and Contingencies - $810,000) 29 (2) S.R.4021 over Bennetts Run, Newberry 30 Township, Bridge Replacement 581,000 19920S1746B2236 - 230 -
1 (Base Construction Allocation - 2 $497,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $74,000) 5 (3) S.R.0216, Three Bridges over Lake 6 Marburg, Penn, West Manheim and Manheim 7 Townships, Bridge Rehabilitation 970,000 8 (Base Construction Allocation - 9 $825,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $125,000) 12 Section 72. Statewide. 13 (a) (Reserved) 14 (b) State Bridges 15 (1) Statewide Bridge Preservation 5,000,000 16 (Base Construction Allocation - 17 $4,500,000) 18 (Design and Contingencies - $500,000) 19 Section 73. Limitation on expenditure of funds. 20 Any moneys derived from the incurring of debt shall be used 21 solely for effecting the rehabilitation, replacement or removal 22 of bridges located on State highways. All other bridge 23 rehabilitation, replacement or removal shall be financed, and 24 State bridge rehabilitation, replacement or removal may also be 25 financed, from current revenue. 26 Section 74. Debt authorization. 27 The Governor, Auditor General and State Treasurer are hereby 28 authorized and directed to borrow, from time to time, in 29 addition to any authorization heretofore or hereafter enacted, 30 on the credit of the Commonwealth, subject to the limitations 19920S1746B2236 - 231 -
1 provided in the current capital budget, money not exceeding in 2 the aggregate the sum of $596,448,000 as may be found necessary 3 to carry out the acquisition and construction of the State 4 highway projects specifically itemized in this act. 5 Section 75. Issue of bonds. 6 The indebtedness authorized in this act shall be incurred 7 from time to time and shall be evidenced by one or more series 8 of general obligation bonds of the Commonwealth in such 9 aggregate principal amount for each series as the Governor, 10 Auditor General and State Treasurer shall determine, but the 11 latest stated maturity date shall not exceed 30 years from the 12 date of the bond first issued for each series. 13 Section 76. Estimated useful life of projects. 14 The General Assembly states the estimated useful life of the 15 projects itemized in this act as 30 years. 16 Section 77. Appropriation. 17 The net proceeds of the sale of the obligations authorized in 18 this act are hereby appropriated from the Capital Facilities 19 Fund to the department in the maximum amount of $596,448,000 to 20 be used by it exclusively to defray the financial costs of the 21 State projects specifically itemized in this capital budget. 22 After reserving or paying the expenses of the sale of the 23 obligation, the State Treasurer shall pay out to the department 24 the moneys as required and certified by it to be legally due and 25 payable. 26 Section 78. Federal funds. 27 In addition to those funds appropriated in section 77, all 28 moneys received from the Federal Government for the public 29 improvement projects specifically itemized in this act are also 30 hereby appropriated for those projects. 19920S1746B2236 - 232 -
1 Section 79. Allocation of funds. 2 (a) General rule.--Whenever the department determines that 3 the full estimated financial costs of the projects itemized in 4 this act are not necessary for the proper design, acquisition or 5 construction of such projects, the excess funds no longer 6 required may be allocated by the department to increase the 7 estimated costs of any one or more of the projects specifically 8 itemized in a capital budget. 9 (b) Reimbursement of municipal expenditures.--Moneys raised 10 or expended by municipalities after the effective date of this 11 act, in anticipation of receipt of funds authorized for projects 12 itemized by this act, may be reimbursable to those 13 municipalities. 14 Section 80. Policy on jobs and materials. 15 (a) Jobs.--It is the declared policy of the Commonwealth 16 that the construction projects authorized in this act be used, 17 to the greatest extent possible, to provide for the creation of 18 jobs and the rehiring of the unemployed in this Commonwealth. In 19 order to reach this goal, firms with Commonwealth-based 20 facilities shall be actively solicited to make bids on contracts 21 to furnish products and materials, including, but not limited 22 to, steel and steel products, to be used in these projects. 23 (b) Materials.--Every contract document entered into to 24 undertake a project contained in this act shall provide that any 25 steel or other products to be used or supplied in the 26 performance of this contract shall be required to be 27 manufactured by plants in the United States unless the secretary 28 determines, on a contract by contract basis, that certain 29 required products are not produced in the United States in 30 sufficient quantities to meet the requirements of the contract. 19920S1746B2236 - 233 -
1 Such a determination and the reasons therefor shall be published 2 in the Pennsylvania Bulletin. Decisions made under this 3 subsection shall not be inconsistent with the general provisions 4 of the act of March 3, 1978 (P.L.6, No.3), known as the Steel 5 Products Procurement Act. 6 Section 81. Payment of capital debt service. 7 The repayment of any debt incurred pursuant to this act shall 8 be made from the account and such repayment shall have first 9 claim on the revenues of the account. 10 Section 82. Authorization and debt cumulation. 11 The additional authorization and debt allowance provided for 12 in this act shall be added to the total authorizations and debt 13 incurred pursuant to the act of December 8, 1982 (P.L.848, 14 No.235), known as the Highway-Railroad and Highway Bridge 15 Capital Budget Act for 1982-1983, as amended. 16 Section 83. Effective date. 17 This act shall take effect immediately. E19L72WMB/19920S1746B2236 - 234 -