PRIOR PRINTER'S NO. 2400                      PRINTER'S NO. 3288

THE GENERAL ASSEMBLY OF PENNSYLVANIA


HOUSE BILL

No. 1959 Session of 1991


        INTRODUCED BY LESCOVITZ, CLARK AND CESSAR, AUGUST 2, 1991

        AS REPORTED FROM COMMITTEE ON TRANSPORTATION, HOUSE OF
           REPRESENTATIVES, AS AMENDED, MARCH 18, 1992

                                  A SUPPLEMENT

     1  To the act of December 8, 1982 (P.L.848, No.235), entitled "An
     2     act providing for the adoption of capital projects related to
     3     the repair, rehabilitation or replacement of highway bridges
     4     to be financed from current revenue or by the incurring of
     5     debt and capital projects related to highway and safety
     6     improvement projects to be financed from current revenue of
     7     the Motor License Fund," itemizing bridge projects.

     8     The General Assembly of the Commonwealth of Pennsylvania
     9  hereby enacts as follows:
    10  Section 1.  Short title.
    11     This act shall be known and may be cited as the Highway-
    12  Railroad and Highway Bridge Capital Budget Supplemental Act for
    13  1991-1992.
    14  Section 2.  Definitions.
    15     The following words and phrases when used in this act shall
    16  have the meanings given to them in this section unless the
    17  context clearly indicates otherwise:
    18     "Account."  The Highway Bridge Improvement Restricted Account
    19  within the Motor License Fund.


     1     "Capital project."  A capital project as defined in section
     2  1602-B of the act of April 9, 1929 (P.L.343, No.176), known as
     3  The Fiscal Code, and shall include a county or municipal bridge
     4  rehabilitation, replacement or improvement project as set forth
     5  in this act.
     6     "Department."  The Department of Transportation of the
     7  Commonwealth.
     8     "Secretary."  The Secretary of Transportation of the
     9  Commonwealth.
    10  Section 3.  Total authorization for bridge projects.
    11     (a)  Total projects.--The total authorization for the costs
    12  of the projects itemized pursuant to this act and to be financed
    13  from current revenue or by the incurring of debt shall be
    14  $5,250,000 $952,067,000.                                          <--
    15     (b)  State projects.--The authorization for capital projects
    16  in the category of highway projects to be constructed by the
    17  department, its successors or assigns, and to be financed by the
    18  incurring of debt or from the highway account, itemized in this
    19  act under the category of State bridges, is $5,250,000            <--
    20  $596,448,000.
    21     (c)  Non-State projects.--The authorization for non-State
    22  highway bridge projects to be constructed by municipalities and
    23  to be financed in part with grants not exceeding 80% of the non-
    24  Federal share of the costs made to the local government
    25  municipalities by the department from revenues deposited in the
    26  account itemized in this act under the category of local
    27  bridges, is $0 $355,619,000.                                      <--
    28  Section 4.  Itemization of bridge projects.
    29     The individual capital projects in the category of highway
    30  projects to be constructed by the department, its successors or
    19910H1959B3288                  - 2 -

     1  assigns, and to be financed from current revenue or by the
     2  incurring of debt are hereby itemized, together with their
     3  estimated financial costs, in the following sections.
     4  Section 5.  Adams County (Reserved).                              <--
     5  Section 6.  Allegheny County (Reserved).
     6  Section 7.  Armstrong County (Reserved).
     7  Section 8.  Beaver County (Reserved).
     8  Section 9.  Bedford County (Reserved).
     9  Section 10.  Berks County (Reserved).
    10  Section 11.  Blair County (Reserved).
    11  Section 12.  Bradford County (Reserved).
    12  Section 13.  Bucks County (Reserved).
    13  Section 14.  Butler County (Reserved).
    14  Section 15.  Cambria County (Reserved).
    15  Section 16.  Cameron County (Reserved).
    16  Section 17.  Carbon County (Reserved).
    17  Section 18.  Centre County (Reserved).
    18  Section 19.  Chester County (Reserved).
    19  Section 20.  Clarion County (Reserved).
    20  Section 21.  Clearfield County (Reserved).
    21  Section 22.  Clinton County (Reserved).
    22  Section 23.  Columbia County (Reserved).
    23  Section 24.  Crawford County (Reserved).
    24  Section 25.  Cumberland County (Reserved).
    25  Section 26.  Dauphin County (Reserved).
    26  Section 27.  Delaware County (Reserved).
    27  Section 28.  Elk County (Reserved).
    28  Section 29.  Erie County (Reserved).
    29  Section 30.  Fayette County (Reserved).
    30  Section 31.  Forest County (Reserved).
    19910H1959B3288                  - 3 -

     1  Section 32.  Franklin County (Reserved).
     2  Section 33.  Fulton County (Reserved).
     3  Section 34.  Greene County (Reserved).
     4  Section 35.  Huntingdon County (Reserved).
     5  Section 36.  Indiana County (Reserved).
     6  Section 37.  Jefferson County (Reserved).
     7  Section 38.  Juniata County (Reserved).
     8  Section 39.  Lackawanna County (Reserved).
     9  Section 40.  Lancaster County (Reserved).
    10  Section 41.  Lawrence County (Reserved).
    11  Section 42.  Lebanon County (Reserved).
    12  Section 43.  Lehigh County (Reserved).
    13  Section 44.  Luzerne County (Reserved).
    14  Section 45.  Lycoming County (Reserved).
    15  Section 46.  McKean County (Reserved).
    16  Section 47.  Mercer County (Reserved).
    17  Section 48.  Mifflin County.
    18     (a)  Local Bridges (Reserved)
    19     (b)  State Bridges
    20         (A)  S.R.3021, Newton Hamilton Bridge over
    21             Juniata River, Newton Hamilton Borough,
    22             Bridge Replacement                          5,250,000
    23             (Base Construction Allocation -
    24             $4,750,000)
    25             (Land Allocation - $200,000)
    26             (Design and Contingencies - $300,000)
    27  Section 49.  Monroe County (Reserved).
    28  Section 50.  Montgomery County (Reserved).
    29  Section 51.  Montour County (Reserved).
    30  Section 52.  Northampton County (Reserved).
    19910H1959B3288                  - 4 -

     1  Section 53.  Northumberland County (Reserved).
     2  Section 54.  Perry County (Reserved).
     3  Section 55.  Philadelphia County (Reserved).
     4  Section 56.  Pike County (Reserved).
     5  Section 57.  Potter County (Reserved).
     6  Section 58.  Schuylkill County (Reserved).
     7  Section 59.  Snyder County (Reserved).
     8  Section 60.  Somerset County (Reserved).
     9  Section 61.  Sullivan County (Reserved).
    10  Section 62.  Susquehanna County (Reserved).
    11  Section 63.  Tioga County (Reserved).
    12  Section 64.  Union County (Reserved).
    13  Section 65.  Venango County (Reserved).
    14  Section 66.  Warren County (Reserved).
    15  Section 67.  Washington County (Reserved).
    16  Section 68.  Wayne County (Reserved).
    17  Section 69.  Westmoreland County (Reserved).
    18  Section 70.  Wyoming County (Reserved).
    19  Section 71.  York County (Reserved).
    20  SECTION 5.  ADAMS COUNTY.                                         <--
    21     (A)  LOCAL BRIDGES (RESERVED)
    22     (B)  STATE BRIDGES
    23         (1)  S.R.3038, CROOKED CREEK ROAD OVER
    24             MARSH CREEK, FRANKLIN TOWNSHIP, BRIDGE
    25             REPLACEMENT                                   885,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $750,000)
    28             (LAND ALLOCATION - $10,000)
    29             (DESIGN AND CONTINGENCIES - $125,000)
    30         (2)  S.R.0234, KING STREET OVER BEAVER
    19910H1959B3288                  - 5 -

     1             CREEK, EAST BERLIN BOROUGH, BRIDGE
     2             REPLACEMENT                                   746,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $640,000)
     5             (LAND ALLOCATION - $10,000)
     6             (DESIGN AND CONTINGENCIES - $96,000)
     7         (3)  S.R.3005, PUMPING STATION ROAD OVER
     8             PLUM CREEK, FREEDOM TOWNSHIP, BRIDGE
     9             REPLACEMENT                                   246,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $212,000)
    12             (LAND ALLOCATION - $10,000)
    13             (DESIGN AND CONTINGENCIES - $24,000)
    14         (4)  S.R.2012, BRIDGE OVER ALLOWAY CREEK,
    15             MT. JOY AND GERMANY TOWNSHIPS, BRIDGE
    16             REPLACEMENT                                   510,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $436,000)
    19             (LAND ALLOCATION - $10,000)
    20             (DESIGN AND CONTINGENCIES - $64,000)
    21         (5)  S.R.4002, BRIDGE OVER GETTYSBURG
    22             RAILROAD, BUTLER TOWNSHIP, BRIDGE
    23             REPLACEMENT                                 1,026,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $889,000)
    26             (LAND ALLOCATION - $5,000)
    27             (DESIGN AND CONTINGENCIES - $132,000)
    28         (6)  PA.194, BRIDGE OVER TRIBUTARY, BEAVER
    29             CREEK, ABBOTTSTOWN BOROUGH, BRIDGE
    30             REPLACEMENT                                   245,000
    19910H1959B3288                  - 6 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $196,000)
     3             (LAND ALLOCATION - $10,000)
     4             (DESIGN AND CONTINGENCIES - $39,000)
     5  SECTION 6.  ALLEGHENY COUNTY.
     6     (A)  LOCAL BRIDGES
     7         (1)  WILKINS TOWNSHIP, IVY STREET BRIDGE,
     8             BRIDGE REPLACEMENT                            175,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $175,000)
    11         (2)  WILKINS TOWNSHIP, RUSSELL LANE BRIDGE,
    12             BRIDGE REPLACEMENT                            175,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $175,000)
    15         (3)  WILKINS TOWNSHIP, BAKER STREET BRIDGE,
    16             BRIDGE REPLACEMENT                            250,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $250,000)
    19         (4)  SHALER TOWNSHIP, ANDERSON ROAD BRIDGE
    20             NO.11 (WB11), BRIDGE REPLACEMENT              380,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $300,000)
    23             (LAND ALLOCATION - $5,000)
    24             (DESIGN AND CONTINGENCIES - $75,000)
    25         (5)  CRESCENT TOWNSHIP, RIVERVIEW ROAD
    26             BRIDGE NO.6 (FU06), BRIDGE REPLACEMENT        755,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $650,000)
    29             (LAND ALLOCATION - $10,000)
    30             (DESIGN AND CONTINGENCIES - $95,000)
    19910H1959B3288                  - 7 -

     1         (6)  PITCAIRN BOROUGH, 2ND STREET BRIDGE
     2             OVER DIRTY CAMP RUN CENTER AND WALL
     3             AVENUES, BRIDGE REPLACEMENT                   175,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $175,000)
     6         (7)  RANKIN BOROUGH, KENMAWR AVENUE BRIDGE,
     7             BRIDGE REPLACEMENT                            175,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $175,000)
    10         (8)  WALL BOROUGH, SPRING HILL BRIDGE OVER
    11             CONRAIL, WALL AVENUE AND PA. ROUTE 30,
    12             BRIDGE REPLACEMENT                          2,882,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $2,882,000)
    15         (9)  BRADDOCK AND NORTH BRADDOCK BOROUGHS,
    16             OVERLAND BRIDGE OVER CONRAIL, BRIDGE
    17             REPLACEMENT                                   818,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $818,000)
    20         (10)  PLEASANT HILLS BOROUGH, PLEASANT
    21             HILLS BOULEVARD BRIDGE NO.02, BRIDGE
    22             REPLACEMENT                                 1,000,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $400,000)
    25             (LAND ALLOCATION - $500,000)
    26             (DESIGN AND CONTINGENCIES - $100,000)
    27         (11)  EMSWORTH BOROUGH, GIBSON STREET OVER
    28             LOWRIES RUN, BRIDGE REPLACEMENT               220,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $200,000)
    19910H1959B3288                  - 8 -

     1             (DESIGN AND CONTINGENCIES - $20,000)
     2         (12)  WEST VIEW BOROUGH, MARTSOLF AVENUE
     3             BRIDGE OVER CENTER AVENUE, BRIDGE
     4             REPLACEMENT                                   660,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $600,000)
     7             (DESIGN AND CONTINGENCIES - $60,000)
     8         (13)  WEST VIEW BOROUGH, RIDGEWOOD AVENUE
     9             BRIDGE OVER CENTER AVENUE, BRIDGE
    10             REPLACEMENT                                   660,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $600,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $50,000)
    15         (14)  BEN AVON BOROUGH, SPRUCE RUN ROAD
    16             (NOW ALDER DRIVE AND AVALON BOROUGH
    17             BUILDING), BRIDGE REPLACEMENT                  70,000
    18         (15)  BEN AVON BOROUGH, SPRUCE RUN ROAD
    19             NEAR BUILDING MILL LUMBER COMPANY,
    20             BRIDGE REPLACEMENT                             70,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $70,000)
    23         (16)  EMSWORTH BOROUGH, HERRON AVENUE OVER
    24             LOWRIES RUN, BRIDGE REPLACEMENT               560,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $500,000)
    27             (LAND ALLOCATION - $10,000)
    28             (DESIGN AND CONTINGENCIES - $50,000)
    29         (17)  CITY OF PITTSBURGH, GREENFIELD AVENUE
    30             BRIDGE NO.39, BRIDGE REPLACEMENT              380,000
    19910H1959B3288                  - 9 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $300,000)
     3             (LAND ALLOCATION - $5,000)
     4             (DESIGN AND CONTINGENCIES - $75,000)
     5         (18)  CITY OF PITTSBURGH, CORLISS TUNNEL
     6             NO.18, BRIDGE REPLACEMENT                   1,575,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $1,400,000)
     9             (DESIGN AND CONTINGENCIES - $175,000)
    10         (19)  CITY OF PITTSBURGH, MISSION STREET
    11             BRIDGE EAST NO.60, BRIDGE REPLACEMENT         880,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $800,000)
    14             (DESIGN AND CONTINGENCIES - $80,000)
    15         (20)  CITY OF PITTSBURGH, MISSION STREET
    16             BRIDGE WEST NO.60, BRIDGE REPLACEMENT       2,900,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $1,400,000)
    19             (DESIGN AND CONTINGENCIES - $1,500,000)
    20         (21)  CITY OF PITTSBURGH, ACRATA WAY BRIDGE
    21             NO.4, BRIDGE REPLACEMENT                    1,115,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $1,000,000)
    24             (DESIGN AND CONTINGENCIES - $115,000)
    25         (22)  PORT AUTHORITY OF ALLEGHENY COUNTY,
    26             LOWRIES RUN VIADUCT BMS
    27             NO.02742900009004, EMSWORTH BRIDGE,
    28             BRIDGE REPLACEMENT                            126,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $126,000)
    19910H1959B3288                 - 10 -

     1         (23)  BETHEL PARK BOROUGH, BROWNSVILLE AND
     2             LIBRARY ROADS BRIDGE NO.6 OVER PINEY
     3             FORK CREEK, BRIDGE REPLACEMENT                490,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $385,000)
     6             (LAND ALLOCATION - $5,000)
     7             (DESIGN AND CONTINGENCIES - $100,000)
     8         (24)  BETHEL PARK BOROUGH, KINGS SCHOOL
     9             ROAD BRIDGE (PY02) OVER NORTH BRANCH
    10             PINEY FORK, BRIDGE REPLACEMENT                265,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $225,000)
    13             (DESIGN AND CONTINGENCIES - $40,000)
    14         (25)  BETHEL PARK BOROUGH, BETHEL CHURCH
    15             ROAD BRIDGE NO.2 OVER GRAESERS' RUN,
    16             BRIDGE REPLACEMENT                            250,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $200,000)
    19             (DESIGN AND CONTINGENCIES - $50,000)
    20         (26)  UPPER ST. CLAIR TOWNSHIP, PAINTERS'
    21             RUN BRIDGE NO.2, BRIDGE REHABILITATION         95,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $75,000)
    24             (DESIGN AND CONTINGENCIES - $20,000)
    25         (27)  UPPER ST. CLAIR TOWNSHIP, PAINTERS'
    26             RUN BRIDGE NO.8, BRIDGE REPLACEMENT           290,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $250,000)
    29             (DESIGN AND CONTINGENCIES - $40,000)
    30         (28)  CITY OF PITTSBURGH, MCARDLE VIADUCT
    19910H1959B3288                 - 11 -

     1             NO.2, BRIDGE REHABILITATION                 2,526,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $2,246,000)
     4             (DESIGN AND CONTINGENCIES - $280,000)
     5         (29)  SHALER TOWNSHIP, HODIL STREET BRIDGE
     6             1,000 FEET NORTHEAST OF THOMPSON RUN
     7             ROAD, BRIDGE REPLACEMENT                      250,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $200,000)
    10             (LAND ALLOCATION - $25,000)
    11             (DESIGN AND CONTINGENCIES - $25,000)
    12     (B)  STATE BRIDGES
    13         (1)  S.R.2017, INDUSTRY ROAD BRIDGE OVER
    14             BOYDS HOLLOW ROAD, ELIZABETH TOWNSHIP,
    15             BRIDGE REPLACEMENT                            500,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $300,000)
    18             (LAND ALLOCATION - $100,000)
    19             (DESIGN AND CONTINGENCIES - $100,000)
    20         (2)  S.R.0019, MARSHALL AVENUE RAMP OVER
    21             CHATEAU STREET, CITY OF PITTSBURGH,
    22             BRIDGE REHABILITATION                       4,120,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $3,700,000)
    25             (LAND ALLOCATION - $50,000)
    26             (DESIGN AND CONTINGENCIES - $370,000)
    27         (3)  S.R.0910, INDIANOLA ROAD BRIDGE OVER
    28             DEER CREEK, HARMAR TOWNSHIP, BRIDGE
    29             REHABILITATION                              1,050,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19910H1959B3288                 - 12 -

     1             $850,000)
     2             (LAND ALLOCATION - $50,000)
     3             (DESIGN AND CONTINGENCIES - $150,000)
     4         (4)  S.R.3001, RAILROAD OVERHEAD OVER
     5             MILLERS RUN ROAD, SOUTH FAYETTE
     6             TOWNSHIP, BRIDGE REPLACEMENT                  300,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $150,000)
     9             (LAND ALLOCATION - $50,000)
    10             (DESIGN AND CONTINGENCIES - $100,000)
    11         (5)  S.R.3026, MILLERS RUN ROAD, BRIDGE
    12             OVER MILLERS RUN, SOUTH FAYETTE
    13             TOWNSHIP, BRIDGE REPLACEMENT                  600,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $400,000)
    16             (LAND ALLOCATION - $50,000)
    17             (DESIGN AND CONTINGENCIES - $150,000)
    18         (6)  S.R.0366, TARENTUM BRIDGE, TARENTUM
    19             BOROUGH AND CITY OF NEW KENSINGTON,
    20             BRIDGE PAINTING                             3,320,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $3,000,000)
    23             (LAND ALLOCATION - $20,000)
    24             (DESIGN AND CONTINGENCIES - $300,000)
    25         (7)  CRESCENT STREET BRIDGE OVER PINE
    26             CREEK, BOROUGH OF ETNA, BRIDGE
    27             REPLACEMENT                                   770,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $654,000)
    30             (LAND ALLOCATION - $39,000)
    19910H1959B3288                 - 13 -

     1             (DESIGN AND CONTINGENCIES - $77,000)
     2         (8)  MONTOUR RAILROAD, TRESTLE OVER
     3             BRIGHTWOOD ROAD, BETHEL PARK BOROUGH,
     4             BRIDGE REMOVAL                                180,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $160,000)
     7             (DESIGN AND CONTINGENCIES - $20,000)
     8         (9)  BRIDGEVILLE/BOWER HILL ROAD, BRIDGE
     9             NUMBER 1 OVER MCLAUGHLIN RUN, UPPER ST.
    10             CLAIR TOWNSHIP, BRIDGE REPLACEMENT            475,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $380,000)
    13             (LAND ALLOCATION - $5,000)
    14             (DESIGN AND CONTINGENCIES - $90,000)
    15         (10)  S.R.0051, BRIDGE OVER LEWIS RUN,
    16             JEFFERSON BOROUGH, BRIDGE REPLACEMENT         710,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $600,000)
    19             (LAND ALLOCATION - $10,000)
    20             (DESIGN AND CONTINGENCIES - $100,000)
    21         (11)  TURNPIKE RAMP BRIDGE OVER U.S.22,
    22             MONROEVILLE BOROUGH, BRIDGE
    23             REHABILITATION                                109,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $99,000)
    26             (DESIGN AND CONTINGENCIES - $10,000)
    27         (12)  TURNPIKE RAMP BRIDGE OVER U.S.22
    28             BUSINESS, MONROEVILLE BOROUGH, BRIDGE
    29             REHABILITATION                                401,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19910H1959B3288                 - 14 -

     1             $365,000)
     2             (DESIGN AND CONTINGENCIES - $36,000)
     3         (13)  WABASH BRIDGE OVER MONONGAHELA RIVER,
     4             CITY OF PITTSBURGH, NEW BRIDGE
     5             CONSTRUCTION                               35,000,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $30,000,000)
     8             (LAND ALLOCATION - $2,000,000)
     9             (DESIGN AND CONTINGENCIES - $3,000,000)
    10  SECTION 7.  ARMSTRONG COUNTY.
    11     (A)  LOCAL BRIDGES
    12         (1)  WAYNE TOWNSHIP, T-738, COGLER BRIDGE
    13             OVER SOUTH FORK PINE CREEK, BRIDGE
    14             REPLACEMENT                                   476,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $421,000)
    17             (LAND ALLOCATION - $15,000)
    18             (DESIGN AND CONTINGENCIES - $40,000)
    19         (2)  VALLEY TOWNSHIP, T-590, PINE FURNACE
    20             BRIDGE OVER SOUTH FORK PINE CREEK,
    21             BRIDGE REPLACEMENT                            554,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $499,000)
    24             (LAND ALLOCATION - $15,000)
    25             (DESIGN AND CONTINGENCIES - $40,000)
    26         (3)  EAST FRANKLIN TOWNSHIP, T-530, GLADE
    27             RUN BRIDGE OVER GLADE RUN, BRIDGE
    28             REPLACEMENT                                   299,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $256,000)
    19910H1959B3288                 - 15 -

     1             (LAND ALLOCATION - $8,000)
     2             (DESIGN AND CONTINGENCIES - $35,000)
     3         (4)  BOGGS TOWNSHIP, T-529, SOUTH FORK PINE
     4             CREEK BRIDGE OVER SOUTH FORK PINE
     5             CREEK, BRIDGE REPLACEMENT                     567,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $512,000)
     8             (LAND ALLOCATION - $15,000)
     9             (DESIGN AND CONTINGENCIES - $40,000)
    10         (5)  WASHINGTON TOWNSHIP, T-396, SIMPSON
    11             BRIDGE OVER HULING RUN, BRIDGE
    12             REPLACEMENT                                   347,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $302,000)
    15             (LAND ALLOCATION - $10,000)
    16             (DESIGN AND CONTINGENCIES - $35,000)
    17         (6)  PLUM CREEK TOWNSHIP, JOHNSTON BRIDGE
    18             OVER SOUTH BRANCH PLUM CREEK, BRIDGE
    19             REPLACEMENT                                   470,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $415,000)
    22             (LAND ALLOCATION - $10,000)
    23             (DESIGN AND CONTINGENCIES - $45,000)
    24         (7)  PLUM CREEK TOWNSHIP, GASTOWN BRIDGE
    25             OVER PLUM CREEK, BRIDGE REPLACEMENT           513,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $463,000)
    28             (LAND ALLOCATION - $5,000)
    29             (DESIGN AND CONTINGENCIES - $45,000)
    30     (B)  STATE BRIDGES
    19910H1959B3288                 - 16 -

     1         (1)  S.R.4023 BRIDGE OVER LIMESTONE RUN,
     2             EAST FRANKLIN TOWNSHIP, BRIDGE
     3             CONSTRUCTION                                  590,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $500,000)
     6             (LAND ALLOCATION - $30,000)
     7             (DESIGN AND CONTINGENCIES - $60,000)
     8         (2)  S.R.1040 BRIDGE OVER CONRAIL RAILROAD,
     9             KITTANNING BOROUGH, BRIDGE
    10             CONSTRUCTION                                1,640,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $1,500,000)
    13             (LAND ALLOCATION - $40,000)
    14             (DESIGN AND CONTINGENCIES - $100,000)
    15         (3)  S.R.3004, CORNPLANTER RUN BRIDGE OVER
    16             CORNPLANTER RUN, SOUTH BUFFALO
    17             TOWNSHIP, BRIDGE REPLACEMENT                  245,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $200,000)
    20             (LAND ALLOCATION - $5,000)
    21             (DESIGN AND CONTINGENCIES - $40,000)
    22         (4)  S.R.4023, TARRTOWN ROAD BRIDGE OVER
    23             LIMESTONE RUN, EAST FRANKLIN TOWNSHIP,
    24             BRIDGE REPLACEMENT                          1,300,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $1,000,000)
    27             (LAND ALLOCATION - $100,000)
    28             (DESIGN AND CONTINGENCIES - $200,000)
    29  SECTION 8.  BEAVER COUNTY.
    30     (A)  LOCAL BRIDGES
    19910H1959B3288                 - 17 -

     1         (1)  BEAVER FALLS AND NEW BRIGHTON
     2             BOROUGHS, TENTH STREET BRIDGE OVER
     3             BEAVER RIVER, BRIDGE REMOVAL                2,000,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $1,980,000)
     6             (DESIGN AND CONTINGENCIES - $20,000)
     7         (2)  ECONOMY BOROUGH, T-606 TEVEBAUGH
     8             BRIDGE NO.5 OVER TEVEBAUGH RUN, BRIDGE
     9             REPLACEMENT                                   205,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $143,000)
    12             (LAND ALLOCATION - $55,000)
    13             (DESIGN AND CONTINGENCIES - $7,000)
    14         (3)  CITY OF ALIQUIPPA, HOLLYWOOD BRIDGE
    15             OVER TRIBUTARY OF LOGTOWN RUN, BRIDGE
    16             REPLACEMENT                                 1,109,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $1,023,000)
    19             (DESIGN AND CONTINGENCIES - $86,000)
    20         (4)  BRIDGEWATER BOROUGH AND BRIGHTON
    21             TOWNSHIP, BEAVER HOLLOW ROAD BRIDGE
    22             OVER PL&E RAILROAD, BRIDGE REPLACEMENT      8,000,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $7,000,000)
    25             (LAND ALLOCATION - $400,000)
    26             (DESIGN AND CONTINGENCIES - $600,000)
    27     (B)  STATE BRIDGES
    28         (1)  S.R.0060, BEAVER VALLEY EXPRESSWAY
    29             OVER BRADY'S RUN ROAD, BRIGHTON
    30             TOWNSHIP, BRIDGE REHABILITATION               535,000
    19910H1959B3288                 - 18 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $500,000)
     3             (LAND ALLOCATION - $5,000)
     4             (DESIGN AND CONTINGENCIES - $30,000)
     5         (2)  S.R.0060, VANPORT BRIDGE OVER OHIO
     6             RIVER, VANPORT TOWNSHIP, BRIDGE
     7             REHABILITATION                              2,200,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $2,000,000)
    10             (LAND ALLOCATION - $50,000)
    11             (DESIGN AND CONTINGENCIES - $150,000)
    12         (3)  S.R.0051, TAGGERT ROAD BRIDGE OVER
    13             CONRAIL, DARLINGTON TOWNSHIP, BRIDGE
    14             REPLACEMENT                                 2,000,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $1,800,000)
    17             (LAND ALLOCATION - $100,000)
    18             (DESIGN AND CONTINGENCIES - $100,000)
    19         (4)  S.R.4039, BRIDGE OVER SIX MILE RUN,
    20             BRIGHTON TOWNSHIP, BRIDGE REPLACEMENT         200,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $160,000)
    23             (LAND ALLOCATION - $10,000)
    24             (DESIGN AND CONTINGENCIES - $20,000)
    25         (5)  S.R.4031 OVER BRADY RUN TRIBUTARY,
    26             BRIGHTON TOWNSHIP, BRIDGE REPLACEMENT         212,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $180,000)
    29             (LAND ALLOCATION - $10,000)
    30             (DESIGN AND CONTINGENCIES - $22,000)
    19910H1959B3288                 - 19 -

     1         (6)  S.R.0068, MCKINLEYS RUN BRIDGE OVER
     2             MCKINLEYS RUN, ROCHESTER TOWNSHIP,
     3             BRIDGE REPLACEMENT                            201,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $177,000)
     6             (LAND ALLOCATION - $2,000)
     7             (DESIGN AND CONTINGENCIES - $22,000)
     8         (7)  S.R.0168, BEALER RUN, OHIOVILLE
     9             BOROUGH, BRIDGE REPLACEMENT                   286,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $250,000)
    12             (LAND ALLOCATION - $10,000)
    13             (DESIGN AND CONTINGENCIES - $26,000)
    14         (8)  AMBRIDGE - ALIQUIPPA BRIDGE OVER OHIO
    15             RIVER, AMBRIDGE AND ALIQUIPPA BOROUGHS,
    16             NEW BRIDGE CONSTRUCTION                     5,000,000
    17  SECTION 9.  BEDFORD COUNTY.
    18     (A)  LOCAL BRIDGES
    19         (1)  SOUTHAMPTON TOWNSHIP, T-306, TOWNSHIP
    20             BRIDGE NO.1 OVER BLACK VALLEY CREEK,
    21             BRIDGE REPLACEMENT                            360,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $300,000)
    24             (LAND ALLOCATION - $10,000)
    25             (DESIGN AND CONTINGENCIES - $50,000)
    26     (B)  STATE BRIDGES (RESERVED)
    27  SECTION 10.  BERKS COUNTY.
    28     (A)  LOCAL BRIDGES
    29         (1)  MARION TOWNSHIP, T-498 SCHARFF ROAD
    30             OVER TULPEHOCKEN CREEK, BRIDGE
    19910H1959B3288                 - 20 -

     1             REPLACEMENT                                   740,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $630,000)
     4             (LAND ALLOCATION - $40,000)
     5             (DESIGN AND CONTINGENCIES - $70,000)
     6         (2)  OLEY TOWNSHIP, T-595 YODER ROAD OVER
     7             OYSTERVILLE CREEK, BRIDGE REPLACEMENT         250,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $210,000)
    10             (LAND ALLOCATION - $10,000)
    11             (DESIGN AND CONTINGENCIES - $30,000)
    12         (3)  WYOMISSING BOROUGH, LAUERS LANE OVER
    13             WYOMISSING CREEK, BRIDGE REPLACEMENT          320,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $275,000)
    16             (LAND ALLOCATION - $15,000)
    17             (DESIGN AND CONTINGENCIES - $30,000)
    18     (B)  STATE BRIDGES
    19         (1)  S.R.0222 UNDER S.R.0422, CITY OF
    20             READING, BRIDGE REPLACEMENT                   163,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $148,000)
    23             (DESIGN AND CONTINGENCIES - $15,000)
    24         (2)  S.R.0222 UNDER S.R.0422, CITY OF
    25             READING, BRIDGE REPLACEMENT                   262,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $238,000)
    28             (DESIGN AND CONTINGENCIES - $24,000)
    29         (3)  S.R.0501 OVER I-78, BETHEL TOWNSHIP,
    30             BRIDGE REPLACEMENT                          1,100,000
    19910H1959B3288                 - 21 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $1,000,000)
     3             (DESIGN AND CONTINGENCIES - $100,000)
     4         (4)  S.R.0422 OVER RAILROAD, CITY OF
     5             READING, BRIDGE REPLACEMENT                   410,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $372,000)
     8             (DESIGN AND CONTINGENCIES - $38,000)
     9         (5)  S.R.0222 OVER RAILROAD, WEST READING
    10             BOROUGH, BRIDGE REPLACEMENT                 2,187,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $1,988,000)
    13             (DESIGN AND CONTINGENCIES - $199,000)
    14         (6)  S.R.0422 OVER SCHUYLKILL RIVER, CITY
    15             OF READING, BRIDGE REPLACEMENT              2,033,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $1,848,000)
    18             (DESIGN AND CONTINGENCIES - $185,000)
    19         (7)  S.R.0422 OVER RAILROAD, CUMRU
    20             TOWNSHIP, BRIDGE REPLACEMENT                  527,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $479,000)
    23             (DESIGN AND CONTINGENCIES - $48,000)
    24         (8)  S.R.0422 OVER SCHUYLKILL RIVER, CUMRU
    25             TOWNSHIP, BRIDGE REPLACEMENT                1,345,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $1,222,000)
    28             (DESIGN AND CONTINGENCIES - $123,000)
    29         (9)  S.R.2032, HILL CHURCH ROAD OVER A
    30             TRIBUTARY OF WEST SWAMP CREEK, BRIDGE
    19910H1959B3288                 - 22 -

     1             REPLACEMENT                                   215,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $175,000)
     4             (LAND ALLOCATION - $20,000)
     5             (DESIGN AND CONTINGENCIES - $20,000)
     6  SECTION 11.  BLAIR COUNTY.
     7     (A)  LOCAL BRIDGES
     8         (1)  FRANKSTOWN TOWNSHIP, T-444, FALLING
     9             SPRINGS, SOUTH OF CANOE CREEK, BRIDGE
    10             REPLACEMENT                                   270,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $225,000)
    13             (LAND ALLOCATION - $20,000)
    14             (DESIGN AND CONTINGENCIES - $25,000)
    15         (2)  LOGAN TOWNSHIP, 14TH AVENUE OVER MILL
    16             RUN STEAM, BRIDGE REPLACEMENT                 200,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $175,000)
    19             (DESIGN AND CONTINGENCIES - $25,000)
    20         (3)  NORTH WOODBURY TOWNSHIP, T-338,
    21             CENTRAL HIGH ROAD NEAR MARTINSBURG
    22             DISPOSAL PLANT, BRIDGE REPLACEMENT             90,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $75,000)
    25             (LAND ALLOCATION - $10,000)
    26             (DESIGN AND CONTINGENCIES - $5,000)
    27     (B)  STATE BRIDGES
    28         (1)  S.R.0022, SEGMENT 0350, OFFSET 0000,
    29             BERWIND BRIDGE OVER BRUSH RUN,
    30             FRANKSTOWN TOWNSHIP, BRIDGE
    19910H1959B3288                 - 23 -

     1             REPLACEMENT                                   760,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $650,000)
     4             (LAND ALLOCATION - $25,000)
     5             (DESIGN AND CONTINGENCIES - $85,000)
     6         (2)  S.R.0036, SEGMENT 0120, OFFSET 0000,
     7             NORTH ROARING SPRING BRIDGE OVER HALTER
     8             CREEK, TAYLOR TOWNSHIP, BRIDGE
     9             REPLACEMENT                                   950,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $800,000)
    12             (LAND ALLOCATION - $50,000)
    13             (DESIGN AND CONTINGENCIES - $100,000)
    14         (3)  S.R.0220, SEGMENT 0190, OFFSET 0000,
    15             NEWRY BRIDGE OVER POPLAR RUN, NEWRY
    16             BOROUGH, BRIDGE REHABILITATION                750,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $575,000)
    19             (LAND ALLOCATION - $100,000)
    20             (DESIGN AND CONTINGENCIES - $75,000)
    21         (4)  S.R.2010, SEGMENT 0010, OFFSET 0643,
    22             EAST FREEDOM BRIDGE OVER FRANKSTOWN
    23             BRANCH OF JUNIATA RIVER, FREEDOM
    24             TOWNSHIP, BRIDGE REPLACEMENT                  920,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $790,000)
    27             (LAND ALLOCATION - $25,000)
    28             (DESIGN AND CONTINGENCIES - $105,000)
    29         (5)  S.R.2014, SEGMENT 0040, OFFSET 0000,
    30             SAM REA BRIDGE OVER THE BEAVERDAM
    19910H1959B3288                 - 24 -

     1             BRANCH OF JUNIATA RIVER, HOLLIDAYSBURG
     2             BOROUGH, BRIDGE REHABILITATION              1,210,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $985,000)
     5             (LAND ALLOCATION - $100,000)
     6             (DESIGN AND CONTINGENCIES - $125,000)
     7         (6)  S.R.2014, SEGMENT 0070, OFFSET 0000,
     8             LOOP BRIDGE OVER THE FRANKSTOWN BRANCH
     9             OF THE JUNIATA RIVER, BLAIR TOWNSHIP,
    10             BRIDGE REHABILITATION                       1,185,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $985,000)
    13             (LAND ALLOCATION - $75,000)
    14             (DESIGN AND CONTINGENCIES - $125,000)
    15  SECTION 12.  BRADFORD COUNTY.
    16     (A)  LOCAL BRIDGES
    17         (1)  ROME TOWNSHIP, T-748, BRIDGE OF
    18             BULLARD CREEK, BRIDGE REPLACEMENT             280,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $240,000)
    21             (LAND ALLOCATION - $10,000)
    22             (DESIGN AND CONTINGENCIES - $30,000)
    23         (2)  SHESHEQUIN TOWNSHIP, T-730, BRIDGE
    24             NO.26 OVER SPALDING CREEK, BRIDGE
    25             REPLACEMENT                                   263,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $214,000)
    28             (LAND ALLOCATION - $10,000)
    29             (DESIGN AND CONTINGENCIES - $39,000)
    30         (3)  WEST BURLINGTON TOWNSHIP, T-328 BRIDGE
    19910H1959B3288                 - 25 -

     1             NO.8 OVER SUGAR CREEK, BRIDGE
     2             REPLACEMENT                                   317,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $260,000)
     5             (LAND ALLOCATION - $10,000)
     6             (DESIGN AND CONTINGENCIES - $47,000)
     7         (4)  CANTON TOWNSHIP, T-310, BRIDGE NO.11
     8             OVER TOWANDA CREEK, BRIDGE REPLACEMENT        216,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $174,000)
    11             (LAND ALLOCATION - $10,000)
    12             (DESIGN AND CONTINGENCIES - $32,000)
    13         (5)  MONROE TOWNSHIP, T-412, BRIDGE NO.20
    14             OVER SOUTH BRANCH TOWANDA CREEK, BRIDGE
    15             REPLACEMENT                                   313,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $256,000)
    18             (LAND ALLOCATION - $10,000)
    19             (DESIGN AND CONTINGENCIES - $47,000)
    20         (6)  SOUTH CREEK TOWNSHIP, T-78, BRIDGE
    21             NO.27 OVER SOUTH CREEK,  BRIDGE
    22             REPLACEMENT                                   166,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $131,000)
    25             (LAND ALLOCATION - $10,000)
    26             (DESIGN AND CONTINGENCIES - $25,000)
    27         (7)  LEROY TOWNSHIP, T-330, BRIDGE NO.16
    28             OVER TOWANDA CREEK, BRIDGE REPLACEMENT        443,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $367,000)
    19910H1959B3288                 - 26 -

     1             (LAND ALLOCATION - $10,000)
     2             (DESIGN AND CONTINGENCIES - $66,000)
     3         (8)  WINDHAM TOWNSHIP, T-760, BRIDGE NO.40
     4             OVER WAPPASENING CREEK, BRIDGE
     5             REPLACEMENT                                   468,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $388,000)
     8             (LAND ALLOCATION - $10,000)
     9             (DESIGN AND CONTINGENCIES - $70,000)
    10         (9)  WELLS TOWNSHIP, T-751, BRIDGE NO.37
    11             OVER BECKWITH CREEK, BRIDGE
    12             REPLACEMENT                                   302,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $247,000)
    15             (LAND ALLOCATION - $10,000)
    16             (DESIGN AND CONTINGENCIES - $45,000)
    17         (10)  ROME TOWNSHIP, T-764, BRIDGE NO.44
    18             OVER BULLARD CREEK, BRIDGE REPLACEMENT        306,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $250,000)
    21             (LAND ALLOCATION - $10,000)
    22             (DESIGN AND CONTINGENCIES - $46,000)
    23         (11)  NORTH TOWANDA TOWNSHIP, T-545, BRIDGE
    24             NO.32 OVER SUGAR CREEK, BRIDGE
    25             REPLACEMENT                                   450,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $372,000)
    28             (LAND ALLOCATION - $10,000)
    29             (DESIGN AND CONTINGENCIES - $68,000)
    30         (12)  BURLINGTON TOWNSHIP, T-552, BRIDGE
    19910H1959B3288                 - 27 -

     1             NO.6 OVER SUGAR CREEK, BRIDGE
     2             REPLACEMENT                                   454,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $376,000)
     5             (LAND ALLOCATION - $10,000)
     6             (DESIGN AND CONTINGENCIES - $68,000)
     7         (13)  LEROY TOWNSHIP, T-320, BRIDGE NO.18
     8             OVER TOWANDA CREEK, BRIDGE REPLACEMENT        288,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $235,000)
    11             (LAND ALLOCATION - $10,000)
    12             (DESIGN AND CONTINGENCIES - $43,000)
    13     (B)  STATE BRIDGES
    14         (1)  S.R.3012, TRIBUTARY TO TOWANDA CREEK,
    15             CANTON TOWNSHIP, BRIDGE REPLACEMENT           319,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $255,000)
    18             (LAND ALLOCATION - $16,000)
    19             (DESIGN AND CONTINGENCIES - $48,000)
    20         (2)  S.R.0220, MURRAY CREEK BRIDGE OVER
    21             MURRAY CREEK, ATHENS TOWNSHIP, BRIDGE
    22             REPLACEMENT                                   682,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $546,000)
    25             (LAND ALLOCATION - $34,000)
    26             (DESIGN AND CONTINGENCIES - $102,000)
    27  SECTION 13.  BUCKS COUNTY.
    28     (A)  LOCAL BRIDGES (RESERVED)
    29     (B)  STATE BRIDGES
    30         (1)  S.R.0032, RIVER ROAD BRIDGE AT FLEECY
    19910H1959B3288                 - 28 -

     1             DALE ROAD OVER PAUNACUSSING CREEK,
     2             SOLEBURY TOWNSHIP, BRIDGE REPLACEMENT       1,100,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $1,000,000)
     5             (DESIGN AND CONTINGENCIES - $100,000)
     6         (2)  S.R.1014, GEIGEL HILL BRIDGE OVER
     7             BRANCH OF SWAMP CREEK, TINICUM
     8             TOWNSHIP, BRIDGE REHABILITATION               242,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $200,000)
    11             (LAND ALLOCATION - $5,000)
    12             (DESIGN AND CONTINGENCIES - $37,000)
    13         (3)  S.R.1016, DELAWARE ROAD BRIDGE OVER
    14             PENNSYLVANIA CANAL, RIGELSVILLE
    15             BOROUGH, BRIDGE REPLACEMENT                 2,133,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $1,688,000)
    18             (LAND ALLOCATION - $175,000)
    19             (DESIGN AND CONTINGENCIES - $270,000)
    20         (4)  S.R.2035, RICHLIEW ROAD BRIDGE OVER
    21             POQUESSING CREEK, BENSALEM TOWNSHIP,
    22             BRIDGE REPLACEMENT                            354,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $295,000)
    25             (LAND ALLOCATION - $30,000)
    26             (DESIGN AND CONTINGENCIES - $29,000)
    27         (5)  S.R.2095, DARK HOLLOW ROAD BRIDGE OVER
    28             NESHAMINY CREEK, BUCKINGHAM TOWNSHIP,
    29             BRIDGE REPLACEMENT                            926,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19910H1959B3288                 - 29 -

     1             $815,000)
     2             (LAND ALLOCATION - $30,000)
     3             (DESIGN AND CONTINGENCIES - $81,000)
     4         (6)  S.R.0202, DOYLESTOWN BYPASS, PA.611 TO
     5             PA.262, 8 BRIDGES, DOYLESTOWN AND
     6             BUCKINGHAM TOWNSHIPS, BRIDGE DECK
     7             REHABILITATION                              4,000,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $3,800,000)
    10             (DESIGN AND CONTINGENCIES - $200,000)
    11         (7)  S.R.0001, LANGHORNE BYPASS, PA.213 TO
    12             PA. TURNPIKE, 5 BRIDGES, BENSALEM AND
    13             MIDDLETOWN TOWNSHIPS, BRIDGE DECK
    14             REHABILITATION                             10,000,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $9,500,000)
    17             (DESIGN AND CONTINGENCIES - $500,000)
    18         (8)  S.R.0152, STATE ROAD BRIDGE OVER
    19             SEPTA, WEST ROCKHILL TOWNSHIP, BRIDGE
    20             DECK REHABILITATION                           500,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $475,000)
    23             (DESIGN AND CONTINGENCIES - $25,000)
    24         (9)  S.R.0212, RICHLANDTOWN ROAD BRIDGE
    25             OVER TOHICKON CREEK, QUAKERTOWN, BRIDGE
    26             DECK REHABILITATION                           510,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $485,000)
    29             (DESIGN AND CONTINGENCIES - $25,000)
    30         (10)  S.R.0611, EASTON ROAD BRIDGE OVER
    19910H1959B3288                 - 30 -

     1             DEEP RUN, BEDMINISTER TOWNSHIP, BRIDGE
     2             DECK REHABILITATION                           500,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $475,000)
     5             (DESIGN AND CONTINGENCIES - $25,000)
     6         (11)  S.R.0611, EASTON ROAD BRIDGE OVER
     7             TOHICKON CREEK, BEDMINISTER TOWNSHIP,
     8             BRIDGE DECK REHABILITATION                    700,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $665,000)
    11             (DESIGN AND CONTINGENCIES - $35,000)
    12         (12)  S.R.0611, EASTON AND CREAMERY ROADS,
    13             TINICUM TOWNSHIP, BRIDGE DECK
    14             REHABILITATION                                350,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $332,000)
    17             (DESIGN AND CONTINGENCIES - $18,000)
    18         (13)  S.R.2006, NEWPORTVILLE-FALLS ROAD
    19             BRIDGE OVER NESHAMINY CREEK, BENSALEM
    20             TOWNSHIP, BRIDGE DECK REHABILITATION        1,400,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $1,330,000)
    23             (DESIGN AND CONTINGENCIES - $70,000)
    24         (14)  S.R.2020, BRISTOL/TYBURN ROAD BRIDGE
    25             OVER AMTRAK, FALLS TOWNSHIP, BRIDGE
    26             DECK REHABILITATION                         1,100,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $1,045,000)
    29             (DESIGN AND CONTINGENCIES - $55,000)
    30         (15)  S.R.2020, TYBURN ROAD AT WARNER
    19910H1959B3288                 - 31 -

     1             COMPANY ROAD, FALLS TOWNSHIP, BRIDGE
     2             DECK REHABILITATION                           600,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $570,000)
     5             (DESIGN AND CONTINGENCIES - $30,000)
     6         (16)  S.R.2020, TYBURN ROAD OVER CONRAIL
     7             SPUR, FALLS TOWNSHIP, BRIDGE DECK
     8             REHABILITATION                                650,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $618,000)
    11             (DESIGN AND CONTINGENCIES - $32,000)
    12         (17)  S.R.2020, TYBURN ROAD AT PENNSYLVANIA
    13             AVENUE, FALLS TOWNSHIP, BRIDGE DECK
    14             REHABILITATION                                450,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $428,000)
    17             (DESIGN AND CONTINGENCIES - $22,000)
    18         (18)  S.R.0513, HULMEVILLE ROAD, BRIDGE
    19             OVER A TRIBUTARY OF POQUESSING CREEK,
    20             BENSALEM TOWNSHIP, BRIDGE REPLACEMENT         400,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $315,000)
    23             (LAND ALLOCATION - $35,000)
    24             (DESIGN AND CONTINGENCIES - $50,000)
    25         (19)  SCHOFIELD COVERED BRIDGE, TYLER STATE
    26             PARK, COVERED BRIDGE TRAIL OVER
    27             NESMAMINY CREEK, NEWTON TOWNSHIP AND
    28             NORTHAMPTON TOWNSHIP, BRIDGE
    29             REPLACEMENT                                   750,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19910H1959B3288                 - 32 -

     1             $600,000)
     2             (LAND ALLOCATION - $25,000)
     3             (DESIGN AND CONTINGENCIES - $125,000)
     4         (20)  S.R.2002, RADCLIFFE STREET OVER ADAMS
     5             HOLLOW CREEK, BRISTOL BOROUGH, BRIDGE
     6             REPLACEMENT                                   335,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $250,000)
     9             (LAND ALLOCATION - $50,000)
    10             (DESIGN AND CONTINGENCIES - $35,000)
    11  SECTION 14.  BUTLER COUNTY.
    12     (A)  LOCAL BRIDGES
    13         (1)  CITY OF BUTLER, WEST NEW CASTLE STREET
    14             BRIDGE OVER SULLIVAN RUN, BRIDGE
    15             REPLACEMENT                                   500,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $420,000)
    18             (LAND ALLOCATION - $20,000)
    19             (DESIGN AND CONTINGENCIES - $60,000)
    20         (2)  CITY OF BUTLER, T-362, WEST PENN
    21             STREET BRIDGE OVER SULLIVAN RUN, BRIDGE
    22             REPLACEMENT                                   450,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $375,000)
    25             (LAND ALLOCATION - $15,000)
    26             (DESIGN AND CONTINGENCIES - $60,000)
    27         (3)  CITY OF BUTLER, T-354, MERCER STREET
    28             BRIDGE OVER SULLIVAN RUN, BRIDGE
    29             REPLACEMENT                                   500,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19910H1959B3288                 - 33 -

     1             $415,000)
     2             (LAND ALLOCATION - $25,000)
     3             (DESIGN AND CONTINGENCIES - $60,000)
     4         (4)  CITY OF BUTLER, T-319, WEST BRADY
     5             STREET BRIDGE OVER SULLIVAN RUN, BRIDGE
     6             REPLACEMENT                                   500,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $420,000)
     9             (LAND ALLOCATION - $20,000)
    10             (DESIGN AND CONTINGENCIES - $60,000)
    11         (5)  PARKER TOWNSHIP, T-731, JONES BRIDGE
    12             OVER NORTH BRANCH BEAR CREEK, BRIDGE
    13             REPLACEMENT                                   585,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $530,000)
    16             (LAND ALLOCATION - $15,000)
    17             (DESIGN AND CONTINGENCIES - $40,000)
    18         (6)  ADAMS TOWNSHIP, T-382, GLADE RUN
    19             BRIDGE OVER GLADE RUN, BRIDGE
    20             REPLACEMENT                                   520,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $470,000)
    23             (DESIGN AND CONTINGENCIES - $15,000)
    24             (LAND ALLOCATION - $35,000)
    25         (7)  DONEGAL TOWNSHIP, T-830, RATTIGAN ROAD
    26             BRIDGE, BRIDGE REPLACEMENT                    190,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $190,000)
    29         (8)  DONEGAL TOWNSHIP, T-830, BUFFALO CREEK
    30             BRIDGE, BRIDGE REPLACEMENT                    270,000
    19910H1959B3288                 - 34 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $270,000)
     3         (9)  CLEARFIELD TOWNSHIP, T-664, MCMILLEN
     4             BRIDGE OVER LITTLE BUFFALO RUN, BRIDGE
     5             REPLACEMENT                                   420,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $365,000)
     8             (LAND ALLOCATION - $15,000)
     9             (DESIGN AND CONTINGENCIES - $40,000)
    10         (10)  WINFIELD TOWNSHIP, T-656, CORNPLANTER
    11             ROAD BRIDGE, BRIDGE REPLACEMENT                 5,000
    12             (BASE CONSTRUCTION ALLOCATION - $5,000)
    13         (11)  BUTLER TOWNSHIP, SAW MILL RUN BRIDGE,
    14             SAW MILL RUN PARK, BRIDGE REPLACEMENT          84,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $84,000)
    17         (12)  ADAMS TOWNSHIP, T-352, KAUFMAN RUN
    18             BRIDGE OVER KAUFMAN RUN, BRIDGE
    19             REPLACEMENT                                   339,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $299,000)
    22             (LAND ALLOCATION - $10,000)
    23             (DESIGN AND CONTINGENCIES - $30,000)
    24         (13)  PENN TOWNSHIP, T-380, ANDERSON RUN
    25             BRIDGE OVER ANDERSON RUN, BRIDGE
    26             REPLACEMENT                                   269,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $226,000)
    29             (LAND ALLOCATION - $8,000)
    30             (DESIGN AND CONTINGENCIES - $35,000)
    19910H1959B3288                 - 35 -

     1         (14)  ZELIENOPLE BOROUGH, MARKET STREET
     2             BRIDGE OVER GLADE RUN, BRIDGE
     3             REPLACEMENT                                   301,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $258,000)
     6             (LAND ALLOCATION - $8,000)
     7             (DESIGN AND CONTINGENCIES - $35,000)
     8         (15)  CITY OF BUTLER, WEST NEW CASTLE
     9             STREET BRIDGE OVER SULLIVAN RUN, BRIDGE
    10             REPLACEMENT                                   500,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $420,000)
    13             (LAND ALLOCATION - $20,000)
    14             (DESIGN AND CONTINGENCIES - $60,000)
    15         (16)  JEFFERSON TOWNSHIP, T-556, THORN
    16             CREEK BRIDGE OVER THORN CREEK, BRIDGE
    17             REPLACEMENT                                   251,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $208,000)
    20             (LAND ALLOCATION - $8,000)
    21             (DESIGN AND CONTINGENCIES - $35,000)
    22         (17)  JEFFERSON TOWNSHIP, T-579, THORN
    23             CREEK BRIDGE OVER THORN CREEK, BRIDGE
    24             REPLACEMENT                                   520,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $470,000)
    27             (LAND ALLOCATION - $15,000)
    28             (DESIGN AND CONTINGENCIES - $35,000)
    29     (B)  STATE BRIDGES
    30         (1)  S.R.0528, EVANS CITY BRIDGE OVER B&O
    19910H1959B3288                 - 36 -

     1             RAILROAD, FORWARD TOWNSHIP, BRIDGE
     2             REPLACEMENT                                 1,480,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $1,400,000)
     5             (LAND ALLOCATION - $20,000)
     6             (DESIGN AND CONTINGENCIES - $60,000)
     7         (2)  S.R.0288 OVER CONNOQUENESSING CREEK,
     8             ZELIENOPLE BOROUGH, BRIDGE REPLACEMENT      1,380,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $1,300,000)
    11             (LAND ALLOCATION - $20,000)
    12             (DESIGN AND CONTINGENCIES - $60,000)
    13         (3)  S.R.3014, SOUTH EVANS CITY BRIDGE OVER
    14             WOLFE CREEK, ADAMS TOWNSHIP, BRIDGE
    15             REPLACEMENT                                   570,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $500,000)
    18             (LAND ALLOCATION - $20,000)
    19             (DESIGN AND CONTINGENCIES - $50,000)
    20         (4)  S.R.3017 OVER KAUFMAN RUN, ADAMS
    21             TOWNSHIP, BRIDGE REPLACEMENT                  580,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $500,000)
    24             (LAND ALLOCATION - $20,000)
    25             (DESIGN AND CONTINGENCIES - $60,000)
    26         (5)  S.R.3001, LYNDORA VIADUCT OVER
    27             CONNOQUENESSING CREEK, CITY OF BUTLER,
    28             BRIDGE REPLACEMENT                          5,335,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $4,850,000)
    19910H1959B3288                 - 37 -

     1             (DESIGN AND CONTINGENCIES - $485,000)
     2         (6)  MAIN STREET VIADUCT, ROUTE NO.8 OVER
     3             B&LE - B&O RAILROADS, CITY OF BUTLER,
     4             BRIDGE REPLACEMENT                         23,000,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $10,800,000)
     7             LAND ALLOCATION - $700,000)
     8             (DESIGN AND CONTINGENCIES -
     9             $11,500,000)
    10         (7)  S.R.0356, WAYNE STREET VIADUCT OVER
    11             CONNOQUENESSING CREEK, CITY OF BUTLER,
    12             BRIDGE REPLACEMENT                            902,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $902,000)
    15         (8)  MAIN STREET VIADUCT OVER B&LE - B&O
    16             RAILROADS, CITY OF BUTLER, BRIDGE
    17             REPLACEMENT                                   980,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $980,000)
    20         (9)  S.R.0356, WAYNE STREET VIADUCT OVER
    21             CONNOQUENESSING CREEK, CITY OF BUTLER,
    22             BRIDGE REPLACEMENT                          5,150,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $4,800,000)
    25             (LAND ALLOCATION - $350,000)
    26         (10)  S.R.1011, THORNE RUN BRIDGE OVER
    27             THORNE RUN, OAKLAND TOWNSHIP, BRIDGE
    28             REPLACEMENT                                   305,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $250,000)
    19910H1959B3288                 - 38 -

     1             (LAND ALLOCATION - $25,000)
     2             (DESIGN AND CONTINGENCIES - $30,000)
     3         (11)  S.R.0108, WOLF RUN BRIDGE OVER WOLF
     4             RUN, WORTH TOWNSHIP, BRIDGE
     5             REPLACEMENT                                 1,100,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $1,100,000)
     8         (12)  S.R.1011, THORNE RUN BRIDGE OVER
     9             THORNE RUN, OAKLAND TOWNSHIP, BRIDGE
    10             REPLACEMENT                                   305,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $250,000)
    13             (LAND ALLOCATION - $25,000)
    14             (DESIGN AND CONTINGENCIES - $30,000)
    15  SECTION 15.  CAMBRIA COUNTY
    16     (A)  LOCAL BRIDGES
    17         (1)  BARR TOWNSHIP, T-496 DUTCH RUN BRIDGE,
    18             BRIDGE REPLACEMENT                            115,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $100,000)
    21             (LAND ALLOCATION - $5,000)
    22             (DESIGN AND CONTINGENCIES - $10,000)
    23         (2)  EAST TAYLOR TOWNSHIP, T-380 HENCHSTONE
    24             RUN BRIDGE, BRIDGE REPLACEMENT                115,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $100,000)
    27             (LAND ALLOCATION - $5,000)
    28             (DESIGN AND CONTINGENCIES - $10,000)
    29         (3)  CROYLE TOWNSHIP, T-330 CROYLE TOWNSHIP
    30             BRIDGE, BRIDGE REPLACEMENT                    300,000
    19910H1959B3288                 - 39 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $300,000)
     3         (4)  DALE BOROUGH, ANNIE STREET BRIDGE,
     4             BRIDGE REPLACEMENT                            500,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $500,000)
     7         (5)  SPANGLER BOROUGH, SOUTH 15TH STREET
     8             BRIDGE, BRIDGE REPLACEMENT                    100,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $100,000)
    11         (6)  SPANGLER BOROUGH, SOUTH 7TH STREET
    12             BRIDGE, BRIDGE REPLACEMENT                    100,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $100,000)
    15         (7)  CARROLLTOWN BOROUGH, CB-1 CARROLLTOWN
    16             TREATMENT PLANT ACCESS ROAD BRIDGE,
    17             BRIDGE REPLACEMENT                            939,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $939,000)
    20         (8)  LORAINE BOROUGH, HIGHLAND DRIVE
    21             BRIDGE, BRIDGE REPLACEMENT                     50,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $50,000)
    24         (9)  PORTAGE BOROUGH, GELLESPIE AVENUE,
    25             TROUT RUN BRIDGE NO.1, BRIDGE
    26             REPLACEMENT                                   422,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $422,000)
    29         (10)  SPANGLER BOROUGH, SOUTH 15TH STREET
    30             BRIDGE OVER FOX RUN, BRIDGE
    19910H1959B3288                 - 40 -

     1             REPLACEMENT                                   250,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $250,000)
     4         (11)  PORTAGE TOWNSHIP, CONEMAUGH AVENUE,
     5             TROUT RUN BRIDGE NO.3, BRIDGE
     6             REPLACEMENT                                   394,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $394,000)
     9         (12)  PORTAGE BOROUGH, SONMAN AVENUE, TROUT
    10             RUN BRIDGE NO.4, BRIDGE REPLACEMENT           661,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $661,000)
    13         (13)  PORTAGE BOROUGH, JEFFERSON AVENUE,
    14             TROUT RUN BRIDGE NO.2, BRIDGE
    15             REPLACEMENT                                   469,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $469,000)
    18         (14)  SUSQUEHANNA TOWNSHIP, T-559, ALLPORT
    19             BRIDGE NO.5, BRIDGE REPLACEMENT               500,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $500,000)
    22         (15)  BARR TOWNSHIP, T-548, NORTH SPANGLER
    23             BRIDGE NO.4, BRIDGE REPLACEMENT               700,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $700,000)
    26         (16)  HASTINGS BOROUGH, THIRD AVENUE BRIDGE
    27             NO.6, BRIDGE REPLACEMENT                      500,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $500,000)
    30         (17)  ALLEGHENY TOWNSHIP, T-452, WILDWOOD
    19910H1959B3288                 - 41 -

     1             BRIDGE, BRIDGE REPLACEMENT                    500,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $500,000)
     4         (18)  DEAN TOWNSHIP, T-521, DEAN BRIDGE
     5             NO.11, BRIDGE REPLACEMENT                     500,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $500,000)
     8         (19)  CLEARFIELD TOWNSHIP, T-517, CHEST
     9             CREEK BRIDGE NO.7, BRIDGE REPLACEMENT         500,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $500,000)
    12         (20)  BLACKLICK TOWNSHIP, T-549, RED MILL
    13             BRIDGE NO.1, BRIDGE REPLACEMENT               500,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $500,000)
    16         (21)  WHITE TOWNSHIP, T-561, VAN ORNER
    17             BRIDGE NO.10, BRIDGE REPLACEMENT              500,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $500,000)
    20     (B)  STATE BRIDGES
    21         (1)  S.R.0053, NORTH ARMSBURY BRIDGE,
    22             GALLITZIN TOWNSHIP, BRIDGE REPLACEMENT      1,018,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $1,018,000)
    25         (2)  S.R.0053, SOUTH VAN ORMER BRIDGE,
    26             READE TOWNSHIP, BRIDGE REPLACEMENT            570,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $570,000)
    29         (3)  S.R.0053, BRADY RUN BRIDGE, GALLITZIN
    30             TOWNSHIP, BRIDGE REPLACEMENT                2,635,000
    19910H1959B3288                 - 42 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $2,635,000)
     3         (4)  S.R.0271, MAPLE STREET BRIDGE, CITY OF
     4             JOHNSTOWN, BRIDGE REPLACEMENT               2,250,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $2,250,000)
     7         (5)  S.R.0164, SONMAN RUN BRIDGE, PORTAGE
     8             BOROUGH, BRIDGE REPLACEMENT                   550,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $550,000)
    11         (6)  S.R.0240 AND S.R.0219, JUNCTION
    12             BRIDGE, SUSQUEHANNA TOWNSHIP, BRIDGE
    13             REPLACEMENT                                 1,170,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $1,170,000)
    16         (7)  S.R.0253, HOUTZDALE ROAD BRIDGE, READE
    17             TOWNSHIP, BRIDGE REPLACEMENT                  540,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $540,000)
    20         (8)  S.R.1001, LORETTA ROAD BRIDGE,
    21             ALLEGHENY TOWNSHIP, BRIDGE REPLACEMENT        620,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $620,000)
    24         (9)  S.R.2014, BRIDGE OVER NORTH BRANCH OF
    25             LITTLE CONEMAUGH RUN, MUNSTER TOWNSHIP,
    26             BRIDGE REPLACEMENT                            555,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $555,000)
    29         (10)  S.R.4021, BRUBAKERS RUN BRIDGE,
    30             HASTINGS BOROUGH, BRIDGE REPLACEMENT          515,000
    19910H1959B3288                 - 43 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $515,000)
     3         (11)  S.R.0271, MAPLE STREET BRIDGE OVER
     4             LITTLE CONEMAUGH RIVER AND CONRAIL,
     5             CITY OF JOHNSTOWN, BRIDGE
     6             REHABILITATION                              2,225,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $2,000,000)
     9             (LAND ALLOCATION - $25,000)
    10             (DESIGN AND CONTINGENCIES - $200,000)
    11  SECTION 16.  CAMERON COUNTY.
    12     (A)  LOCAL BRIDGES (RESERVED)
    13     (B)  STATE BRIDGES
    14         (1)  S.R.0555, HICKS RUN BRIDGE OVER HICKS
    15             RUN, GIBSON TOWNSHIP, BRIDGE
    16             REPLACEMENT                                 1,050,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $800,000)
    19             (LAND ALLOCATION - $100,000)
    20             (DESIGN AND CONTINGENCIES - $150,000)
    21         (2)  S.R.0555, DRIFTWOOD BRANCH, BRIDGE
    22             OVER SIMMAMAHONING CREEK, DRIFTWOOD
    23             BOROUGH, BRIDGE REPLACEMENT                 2,050,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $1,750,000)
    26             (LAND ALLOCATION - $150,000)
    27             (DESIGN AND CONTINGENCIES - $150,000)
    28  SECTION 17.  CARBON COUNTY.
    29     (A)  LOCAL BRIDGES
    30         (1)  PENN FOREST TOWNSHIP, T-516, COUNTY
    19910H1959B3288                 - 44 -

     1             BRIDGE NO.12 OVER MUD RUN, BRIDGE
     2             REPLACEMENT                                   240,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $200,000)
     5             (LAND ALLOCATION - $10,000)
     6             (DESIGN AND CONTINGENCIES - $30,000)
     7         (2)  EAST PENN TOWNSHIP, T-354 OVER LIZARD
     8             CREEK COUNTY BRIDGE NO.6, BRIDGE
     9             REPLACEMENT                                   445,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $390,000)
    12             (LAND ALLOCATION - $15,000)
    13             (DESIGN AND CONTINGENCIES - $40,000)
    14         (3)  PENN FOREST TOWNSHIP, T-519, COUNTY
    15             BRIDGE NO.11 OVER STONEY CREEK, BRIDGE
    16             REPLACEMENT                                   180,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $140,000)
    19             (LAND ALLOCATION - $10,000)
    20             (DESIGN AND CONTINGENCIES - $30,000)
    21         (4)  LOWER TOWANENSING TOWNSHIP, PRINCESS
    22             CREEK BRIDGE OVER PRINCESS CREEK,
    23             BRIDGE REPLACEMENT                            100,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $85,000)
    26             (DESIGN AND CONTINGENCIES - $15,000)
    27         (5)  EAST PENN TOWNSHIP, T-354, KITTANNING
    28             BRIDGE NO.6 OVER LIZARD CREEK, BRIDGE
    29             REPLACEMENT                                   445,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19910H1959B3288                 - 45 -

     1             $390,000)
     2             (LAND ALLOCATION - $15,000)
     3             (DESIGN AND CONTINGENCIES - $40,000)
     4         (6)  PARKER TOWNSHIP, BRIDGE NO.4 OVER
     5             QUAKAKE CREEK, BRIDGE REPLACEMENT             132,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $112,000)
     8             (DESIGN AND CONTINGENCIES - $20,000)
     9         (7)  TOWAMENSING TOWNSHIP, T-477, COUNTY
    10             BRIDGE NO.16 OVER POHOPOCO CREEK,
    11             BRIDGE REPLACEMENT                            375,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $325,000)
    14             (LAND ALLOCATION - $10,000)
    15             (DESIGN AND CONTINGENCIES - $40,000)
    16         (8)  PENN FOREST TOWNSHIP, T-512, COUNTY
    17             BRIDGE NO.13 OVER MUD RUN, BRIDGE
    18             REPLACEMENT                                   220,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $180,000)
    21             (LAND ALLOCATION - $10,000)
    22             (DESIGN AND CONTINGENCIES - $30,000)
    23         (9)  TOWANSING TOWNSHIP, T-447, COUNTY
    24             BRIDGE NO.16 BIG CREEK BRIDGE OVER
    25             POHOPOCO CREEK, BRIDGE REPLACEMENT            425,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $375,000)
    28             (LAND ALLOCATION - $10,000)
    29             (DESIGN AND CONTINGENCIES - $40,000)
    30     (B)  STATE BRIDGES
    19910H1959B3288                 - 46 -

     1         (1)  S.R.0534 OVER HICKORY RUN, KIDDER
     2             TOWNSHIP, BRIDGE REPLACEMENT                  202,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $144,000)
     5             (LAND ALLOCATION - $29,000)
     6             (DESIGN AND CONTINGENCIES - $29,000)
     7         (2)  S.R.0534 OVER I-80, EAST SIDE BOROUGH,
     8             BRIDGE REPLACEMENT                            508,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $461,000)
    11             (DESIGN AND CONTINGENCIES - $47,000)
    12  SECTION 18.  CENTRE COUNTY.
    13     (A)  LOCAL BRIDGES
    14         (1)  PORT MATILDA BOROUGH, PEDESTRIAN
    15             BRIDGE IN PORT MATILDA COMMUNITY PARK
    16             OVER PA. ROUTE NO.220, BRIDGE
    17             REPLACEMENT                                   165,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $135,000)
    20             (DESIGN AND CONTINGENCIES - $30,000
    21     (B)  STATE BRIDGES
    22         (1)  S.R.2008, PENNS CREEK BRIDGE OVER
    23             PENNS CREEK, GREGG TOWNSHIP, BRIDGE
    24             REPLACEMENT                                 1,600,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $1,250,000)
    27             (LAND ALLOCATION - $150,000)
    28             (DESIGN AND CONTINGENCIES - $200,000)
    29         (2)  S.R.3034, ONE MILE RUN BRIDGE OVER ONE
    30             MILE RUN, RUSH TOWNSHIP, BRIDGE
    19910H1959B3288                 - 47 -

     1             REPLACEMENT                                   500,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $300,000)
     4             (LAND ALLOCATION - $100,000)
     5             (DESIGN AND CONTINGENCIES - $100,000)
     6         (3)  S.R.4004, MCCORMICK RUN BRIDGE OVER
     7             MCCORMICK RUN, UNION TOWNSHIP, BRIDGE
     8             REPLACEMENT                                   500,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $300,000)
    11             (LAND ALLOCATION - $100,000)
    12             (DESIGN AND CONTINGENCIES - $100,000)
    13         (4)  S.R.0970, MOSHANNON CREEK BRIDGE OVER
    14             MOSHANNON CREEK, SNOW SHOE TOWNSHIP,
    15             BRIDGE REPLACEMENT                          1,600,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $1,250,000)
    18             (LAND ALLOCATION - $150,000)
    19             (DESIGN AND CONTINGENCIES - $200,000)
    20  SECTION 19.  CHESTER COUNTY.
    21     (A)  LOCAL BRIDGES
    22         (1)  WEST GOSHEN TOWNSHIP, SOUTH BOLMAR
    23             STREET BRIDGE OVER SEPTA, BRIDGE
    24             REPLACEMENT                                   380,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $300,000)
    27             (LAND ALLOCATION - $50,000)
    28             (DESIGN AND CONTINGENCIES - $30,000)
    29     (B)  STATE BRIDGES
    30         (1)  S.R.0113, UWCHLAN AVENUE BRIDGE OVER
    19910H1959B3288                 - 48 -

     1             U.S.30 BYPASS, EAST CALN TOWNSHIP,
     2             BRIDGE DECK REHABILITATION                    400,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $380,000)
     5             (DESIGN AND CONTINGENCIES - $20,000)
     6         (2)  S.R.3069, GROVE ROAD OVER BROAD RUN,
     7             WEST WHITELAND TOWNSHIP, BRIDGE
     8             REPLACEMENT                                   380,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $300,000)
    11             (LAND ALLOCATION - $50,000)
    12             (DESIGN AND CONTINGENCIES - $30,000)
    13  SECTION 20.  CLARION COUNTY.
    14     (A)  LOCAL BRIDGES (RESERVED)
    15     (B)  STATE BRIDGES
    16         (1)  S.R.0066, LIMESTONE RAILROAD OVERPASS
    17             OVER PENN CENTRAL RAILROAD, LIMESTONE
    18             TOWNSHIP, BRIDGE REPLACEMENT                1,110,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $1,000,000)
    21             (LAND ALLOCATION - $10,000)
    22             (DESIGN AND CONTINGENCIES - $100,000)
    23  SECTION 21.  CLEARFIELD COUNTY.
    24     (A)  LOCAL BRIDGES
    25         (1)  GRAHAM TOWNSHIP, T-697 OVER MORAVIAN
    26             RUN, BRIDGE REPLACEMENT                       405,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $360,000)
    29             (LAND ALLOCATION - $5,000)
    30             (DESIGN AND CONTINGENCIES - $40,000)
    19910H1959B3288                 - 49 -

     1     (B)  STATE BRIDGES
     2         (1)  S.R.0322, ANDERSON CREEK BRIDGE OVER
     3             ANDERSON CREEK, UNION TOWNSHIP, BRIDGE
     4             REPLACEMENT                                 1,500,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $1,300,000)
     7             (LAND ALLOCATION - $100,000)
     8             (DESIGN AND CONTINGENCIES - $100,000)
     9         (2)  S.R.0219, SOUTH BRADY STREET BRIDGE
    10             OVER B&P RAILROAD AND PENTZ RUN, CITY
    11             OF DUBOIS, BRIDGE REPLACEMENT               2,050,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $1,775,000)
    14             (LAND ALLOCATION - $100,000)
    15             (DESIGN AND CONTINGENCIES - $175,000)
    16         (3)  S.R.0053, BEAVER RUN BRIDGE OVER
    17             BEAVER RUN, HOUTZDALE BOROUGH, BRIDGE
    18             REPLACEMENT                                   650,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $450,000)
    21             (LAND ALLOCATION - $100,000)
    22             (DESIGN AND CONTINGENCIES - $100,000)
    23         (4)  S.R.0153, BEAVER RUN BRIDGE OVER
    24             BEAVER RUN, HOUTZDALE BOROUGH, BRIDGE
    25             REPLACEMENT                                   650,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $450,000)
    28             (LAND ALLOCATION - $100,000)
    29             (DESIGN AND CONTINGENCIES - $100,000)
    30         (5)  S.R.2007, GOSS RUN BRIDGE OVER GOSS
    19910H1959B3288                 - 50 -

     1             RUN, BRISBIN BOROUGH, BRIDGE
     2             REPLACEMENT                                   550,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $350,000)
     5             (LAND ALLOCATION - $100,000)
     6             (DESIGN AND CONTINGENCIES - $100,000)
     7         (6)  S.R.1050, MOOSE CREEK BRIDGE OVER
     8             MOOSE CREEK, CLEARFIELD BOROUGH, BRIDGE
     9             REPLACEMENT                                   850,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $650,000)
    12             (LAND ALLOCATION - $100,000)
    13             (DESIGN AND CONTINGENCIES - $100,000)
    14         (7)  S.R.0255, MINE COVER-IN BRIDGE,
    15             VILLAGE OF HOLLYWOOD, BRIDGE
    16             REPLACEMENT                                 1,025,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $750,000)
    19             (LAND ALLOCATION - $100,000)
    20             (DESIGN AND CONTINGENCIES - $175,000)
    21         (8)  S.R.2029, ROARING RUN BRIDGE OVER
    22             ROARING RUN, BRADFORD TOWNSHIP, BRIDGE
    23             REPLACEMENT                                   550,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $350,000)
    26             (LAND ALLOCATION - $100,000)
    27             (DESIGN AND CONTINGENCIES - $100,000)
    28         (9)  S.R.3001, CHEST CREEK BRIDGE OVER
    29             CHEST CREEK, MAHAFFEY BOROUGH, BRIDGE
    30             REPLACEMENT                                 1,650,000
    19910H1959B3288                 - 51 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $1,300,000)
     3             (LAND ALLOCATION - $150,000)
     4             (DESIGN AND CONTINGENCIES - $200,000)
     5         (10)  S.R.2024, LITTLE LAUREL RUN BRIDGE
     6             OVER LITTLE LAUREL RUN, DECATUR
     7             TOWNSHIP, BRIDGE REPLACEMENT                  650,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $450,000)
    10             (LAND ALLOCATION - $100,000)
    11             (DESIGN AND CONTINGENCIES - $100,000)
    12         (11)  S.R.3014, CHEST CREEK BRIDGE OVER
    13             CHEST CREEK, CHEST TOWNSHIP, BRIDGE
    14             REPLACEMENT                                   950,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $750,000)
    17             (LAND ALLOCATION - $100,000)
    18             (DESIGN AND CONTINGENCIES - $100,000)
    19         (12)  S.R.4018, BENNETTS BRANCH BRIDGE OVER
    20             BENNETTS CREEK, HUSTON TOWNSHIP, BRIDGE
    21             REPLACEMENT                                 1,000,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $800,000)
    24             (LAND ALLOCATION - $100,000)
    25             (DESIGN AND CONTINGENCIES - $100,000)
    26         (13)  S.R.3007, ORRS RUN BRIDGE OVER ORRS
    27             RUN, KNOX TOWNSHIP, BRIDGE REPLACEMENT        550,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $350,000)
    30             (LAND ALLOCATION - $100,000)
    19910H1959B3288                 - 52 -

     1             (DESIGN AND CONTINGENCIES - $100,000)
     2  SECTION 22.  CLINTON COUNTY.
     3     (A)  LOCAL BRIDGES
     4         (1)  CHAPMAN TOWNSHIP, OLD ROUTE 120 AT
     5             YOUNG WOMENS CREEK NORTH BEND, BRIDGE
     6             REPLACEMENT                                   960,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $854,000)
     9             LAND ALLOCATION - $10,000)
    10             (DESIGN AND CONTINGENCIES - $96,000)
    11     (B)  STATE BRIDGES
    12         (1)  S.R.0477, LONG RUN BRIDGE OVER LONG
    13             RUN, LAMAR TOWNSHIP, BRIDGE
    14             REPLACEMENT                                   800,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $600,000)
    17             (LAND ALLOCATION - $100,000)
    18             (DESIGN AND CONTINGENCIES - $100,000)
    19         (2)  S.R.0477, FISHING CREEK BRIDGE OVER
    20             TRIBUTARY OF FISHING CREEK, GREENE
    21             TOWNSHIP, BRIDGE REPLACEMENT                  575,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $375,000)
    24             (LAND ALLOCATION - $100,000)
    25             (DESIGN AND CONTINGENCIES - $100,000)
    26         (3)  S.R.1016, PINE CREEK BRIDGE OVER PINE
    27             CREEK, PINE CREEK TOWNSHIP, BRIDGE
    28             REPLACEMENT                                 3,000,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $2,700,000)
    19910H1959B3288                 - 53 -

     1             (LAND ALLOCATION - $150,000)
     2             (DESIGN AND CONTINGENCIES - $150,000)
     3         (4)  S.R.2009, FISHING CREEK BRIDGE OVER
     4             FISHING CREEK, LOGAN TOWNSHIP, BRIDGE
     5             REPLACEMENT                                   650,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $450,000)
     8             (LAND ALLOCATION - $100,000)
     9             (DESIGN AND CONTINGENCIES - $100,000)
    10         (5)  S.R.2022, BITNER RUN BRIDGE OVER
    11             BITNER RUN, BEECH CREEK TOWNSHIP,
    12             BRIDGE REPLACEMENT                            650,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $450,000)
    15             (LAND ALLOCATION - $100,000)
    16             (DESIGN AND CONTINGENCIES - $100,000)
    17         (6)  S.R.2002, CHERRY RUN BRIDGE OVER
    18             CHERRY RUN, PORTER & LOGAN TOWNSHIPS,
    19             BRIDGE REPLACEMENT                            775,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $575,000)
    22             (LAND ALLOCATION - $100,000)
    23             (DESIGN AND CONTINGENCIES - $100,000)
    24         (7)  S.R.2008, LONG RUN BRIDGE OVER LONG
    25             RUN, LAMAR TOWNSHIP, BRIDGE
    26             REPLACEMENT                                   600,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $400,000)
    29             (LAND ALLOCATION - $100,000)
    30             (DESIGN AND CONTINGENCIES - $100,000)
    19910H1959B3288                 - 54 -

     1         (8)  S.R.2016, FISHING CREEK BRIDGE OVER
     2             FISHING CREEK, MILL HALL BOROUGH,
     3             BRIDGE REPLACEMENT                          1,600,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $1,250,000)
     6             (LAND ALLOCATION - $150,000)
     7             (DESIGN AND CONTINGENCIES - $200,000)
     8  SECTION 23.  COLUMBIA COUNTY.
     9     (A)  LOCAL BRIDGES
    10         (1) BEAVER TOWNSHIP, T-367, BRIDGE OVER
    11             CATAWISSA CREEK, BRIDGE REPLACEMENT         1,153,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $980,000)
    14             (LAND ALLOCATION - $51,000)
    15             (DESIGN AND CONTINGENCIES - $122,000)
    16         (2)  MAIN TOWNSHIP, T-468, COLUMBIA COUNTY
    17             BRIDGE NO.42, BRIDGE OVER CATAWISSA
    18             CREEK, BRIDGE REPLACEMENT                   1,357,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $1,086,000)
    21             (LAND ALLOCATION - $68,000)
    22             (DESIGN AND CONTINGENCIES - $203,000)
    23         (3)  STILLWATER BOROUGH, COLUMBIA COUNTY
    24             BRIDGE NO.136 OVER RAVEN CREEK, BRIDGE
    25             REPLACEMENT                                   305,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $252,000)
    28             (LAND ALLOCATION - $21,000)
    29             (DESIGN AND CONTINGENCIES - $32,000)
    30         (4)  MAIN TOWNSHIP, T-413, COLUMBIA COUNTY
    19910H1959B3288                 - 55 -

     1             BRIDGE NO.44 OVER CATAWISSA CREEK,
     2             BRIDGE REPLACEMENT                            990,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $825,000)
     5             (LAND ALLOCATION - $53,000)
     6             (DESIGN AND CONTINGENCIES - $112,000)
     7         (5)  MIFFLIN TOWNSHIP, T-678, COLUMBIA
     8             COUNTY BRIDGE NO.51 OVER SCOTCH RUN,
     9             BRIDGE REPLACEMENT                            233,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $189,000)
    12             (LAND ALLOCATION - $20,000)
    13             (DESIGN AND CONTINGENCIES - $24,000)
    14         (6)  PINE TOWNSHIP, T-621, COLUMBIA COUNTY
    15             BRIDGE NO.85 OVER WEST BRANCH RUN,
    16             BRIDGE REPLACEMENT                            564,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $287,000)
    19             (LAND ALLOCATION - $240,000)
    20             (DESIGN AND CONTINGENCIES - $37,000)
    21         (7)  GREENWOOD TOWNSHIP, T-536, COLUMBIA
    22             COUNTY BRIDGE NO.89 OVER LITTLE FISHING
    23             CREEK, BRIDGE REPLACEMENT                     411,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $343,000)
    26             (LAND ALLOCATION - $25,000)
    27             (DESIGN AND CONTINGENCIES - $43,000)
    28         (8)  HEMLOCK TOWNSHIP, T-360, COLUMBIA
    29             COUNTY BRIDGE NO.67 OVER LITTLE FISHING
    30             CREEK, BRIDGE REPLACEMENT                     620,000
    19910H1959B3288                 - 56 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $525,000)
     3             (LAND ALLOCATION - $21,000)
     4             (DESIGN AND CONTINGENCIES - $74,000)
     5         (9)  MIFFLIN TOWNSHIP, T-415, COLUMBIA
     6             COUNTY BRIDGE NO.53 OVER SCOTCH RUN,
     7             BRIDGE REPLACEMENT                            265,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $217,000)
    10             (LAND ALLOCATION - $20,000)
    11             (DESIGN AND CONTINGENCIES - $28,000)
    12         (10)  ORANGEVILLE BOROUGH, COLUMBIA COUNTY
    13             BRIDGE NO.118 OVER CONNER RACE, BRIDGE
    14             REPLACEMENT                                   440,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $362,000)
    17             (LAND ALLOCATION - $26,000)
    18             (DESIGN AND CONTINGENCIES - $52,000)
    19         (11)  CLEVELAND TOWNSHIP, T-317, COLUMBIA
    20             COUNTY BRIDGE NO.29 OVER MUSSER RUN,
    21             BRIDGE REPLACEMENT                            223,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $175,000)
    24             (LAND ALLOCATION - $25,000)
    25             (DESIGN AND CONTINGENCIES - $23,000)
    26         (12)  NORTH CENTRE TOWNSHIP, T-503,
    27             COLUMBIA COUNTY BRIDGE NO.169 OVER BEAR
    28             CREEK, BRIDGE REPLACEMENT                     274,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $224,000)
    19910H1959B3288                 - 57 -

     1             (LAND ALLOCATION - $21,000)
     2             (DESIGN AND CONTINGENCIES - $29,000)
     3         (13)  NORTH CENTRE TOWNSHIP, T-481,
     4             COLUMBIA COUNTY BRIDGE NO.168 OVER BEAR
     5             CREEK, BRIDGE REPLACEMENT                     270,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $210,000)
     8             (LAND ALLOCATION - $32,000)
     9             (DESIGN AND CONTINGENCIES - $28,000)
    10         (14)  SUGARLOAF TOWNSHIP AND MAIN TOWNSHIP,
    11             T-468, BRIDGE OVER CATAWISSA CREEK,
    12             BRIDGE REPLACEMENT                          1,357,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $1,086,000)
    15             (LAND ALLOCATION - $68,000)
    16             (DESIGN AND CONTINGENCIES - $203,000)
    17     (B)  STATE BRIDGES
    18         (1)  S.R.4001, SEGMENT 0010 OFFSET 0349
    19             OVER NORTH SHORE ROAD, SEDA-COG, BRIDGE
    20             REPLACEMENT                                   857,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $686,000)
    23             (LAND ALLOCATION - $43,000)
    24             (DESIGN AND CONTINGENCIES - $128,000)
    25         (2)  S.R.1021, SEGMENT 0010 OFFSET 0499
    26             OVER LITTLE BEAR CREEK, BRIDGE
    27             REPLACEMENT                                   505,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $380,000)
    30             (LAND ALLOCATION - $50,000)
    19910H1959B3288                 - 58 -

     1             (DESIGN AND CONTINGENCIES - $75,000)
     2  SECTION 24.  CRAWFORD COUNTY.
     3     (A)  LOCAL BRIDGES
     4         (1)  OIL CREEK TOWNSHIP, T-928, DUNCAN
     5             ROAD, BRIDGE OVER PINE CREEK, BRIDGE
     6             REPLACEMENT                                   570,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $500,000)
     9             (LAND ALLOCATION - $20,000)
    10             (DESIGN AND CONTINGENCIES - $50,000)
    11         (2)  EAST FAIRFIELD TOWNSHIP, T-399,
    12             GRIFFEN ROAD, BRIDGE OVER LITTLE SUGAR
    13             CREEK, BRIDGE REHABILITATION                   55,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $50,000)
    16             (DESIGN AND CONTINGENCIES - $5,000)
    17         (3)  WOODCOCK TOWNSHIP, T-652, LEIMBACH
    18             ROAD, BRIDGE OVER GRAVEL RUN, BRIDGE
    19             REPLACEMENT                                   570,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $500,000)
    22             (LAND ALLOCATION - $20,000)
    23             (DESIGN AND CONTINGENCIES - $50,000)
    24     (B)  STATE BRIDGES
    25         (1)  S.R.1002, VENANGO/RAILROAD BRIDGE OVER
    26             CONRAIL RAILROAD, CAMBRIDGE TOWNSHIP,
    27             BRIDGE REPLACEMENT                            880,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $800,000)
    30             (LAND ALLOCATION - $20,000)
    19910H1959B3288                 - 59 -

     1             (DESIGN AND CONTINGENCIES - $60,000)
     2         (2)  S.R.2029, HYDETOWN/INDIAN RUN BRIDGE
     3             OVER INDIAN RUN, HYDETOWN BOROUGH,
     4             BRIDGE REPLACEMENT                            260,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $190,000)
     7             (LAND ALLOCATION - $20,000)
     8             (DESIGN AND CONTINGENCIES - $50,000)
     9         (3)  S.R.1007, BIDLEY CORNERS OVER FEDERAL
    10             RUN, ATHENS TOWNSHIP, BRIDGE
    11             REPLACEMENT                                   320,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $272,000)
    14             (LAND ALLOCATION - $16,000)
    15             (DESIGN AND CONTINGENCIES - $32,000)
    16         (4)  S.R.1024 ON LAKE ROAD OVER OIL CREEK,
    17             BMS 20102400100354, BLOOMFIELD
    18             TOWNSHIP, BRIDGE REPLACEMENT                  340,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $289,000)
    21             (LAND ALLOCATION - $17,000)
    22             (DESIGN AND CONTINGENCIES - $34,000)
    23         (5)  S.R.4011 ON GRANGE ROAD OVER CUSSEWAGO
    24             CREEK, CUSSEWAGO TOWNSHIP, BRIDGE
    25             REPLACEMENT                                   300,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $255,000)
    28             (LAND ALLOCATION - $15,000)
    29             (DESIGN AND CONTINGENCIES - $30,000)
    30         (6)  S.R.1033, TEEPLEVILLE OVER MACKEY RUN
    19910H1959B3288                 - 60 -

     1             RICHMOND TOWNSHIP, BRIDGE REPLACEMENT         280,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $238,000)
     4             (LAND ALLOCATION - $14,000)
     5             (DESIGN AND CONTINGENCIES - $28,000)
     6         (7)  S.R.0089 ON CHURCH RUN ROAD OVER DOLLY
     7             RUN, ROME TOWNSHIP, BRIDGE REPLACEMENT        350,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $297,000)
    10             (LAND ALLOCATION - $18,000)
    11             (DESIGN AND CONTINGENCIES - $35,000)
    12         (8)  S.R.4010 ON SPRINGBORO ROAD OVER CARR
    13             RUN, SPRING TOWNSHIP, BRIDGE
    14             REPLACEMENT                                   375,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $318,000)
    17             (LAND ALLOCATION - $19,000)
    18             (DESIGN AND CONTINGENCIES - $38,000)
    19         (9)  S.R.0618 OVER TRIBUTARY OF INLET RUN,
    20             SUMMIT TOWNSHIP, BRIDGE REPLACEMENT           270,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $230,000)
    23             (LAND ALLOCATION - $13,000)
    24             (DESIGN AND CONTINGENCIES - $27,000)
    25         (10)  S.R.0006 OVER CONNEAUT CREEK, VERNON
    26             TOWNSHIP, BRIDGE REPLACEMENT                  420,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $360,000)
    29             (LAND ALLOCATION - $20,000)
    30             (DESIGN AND CONTINGENCIES - $40,000)
    19910H1959B3288                 - 61 -

     1  SECTION 25.  CUMBERLAND COUNTY.
     2     (A)  LOCAL BRIDGES
     3         (1)  UPPER ALLEN TOWNSHIP, GETTYSBURG PIKE
     4             BRIDGE, SOUTH OF LISBURN ROAD, BRIDGE
     5             REPLACEMENT                                   135,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $100,000)
     8             (LAND ALLOCATION - $10,000)
     9             (DESIGN AND CONTINGENCIES - $25,000)
    10         (2)  MECHANICSBURG BOROUGH, MULBERRY DRIVE
    11             BRIDGE, BRIDGE REPLACEMENT                    135,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $100,000)
    14             (LAND ALLOCATION - $10,000)
    15             (DESIGN AND CONTINGENCIES - $25,000)
    16         (3)  MECHANICSBURG BOROUGH, CHURCH ROAD AT
    17             MULBERRY OVER TRINDLE SPRINGS, BRIDGE
    18             REPLACEMENT                                   135,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $100,000)
    21             (LAND ALLOCATION - $10,000)
    22             (DESIGN AND CONTINGENCIES - $25,000)
    23         (4)  LOWER ALLEN TOWNSHIP, SPANGLER ROAD
    24             BRIDGE OVER CONRAIL, BRIDGE
    25             REPLACEMENT                                   825,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $675,000)
    28             (LAND ALLOCATION - $25,000)
    29             (DESIGN AND CONTINGENCIES - $125,000)
    30         (5)  SOUTHAMPTON TOWNSHIP, T-307,
    19910H1959B3288                 - 62 -

     1             FOGELSONGER ROAD BRIDGE OVER BURD RUN,
     2             BRIDGE REPLACEMENT                            380,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $300,000)
     5             (LAND ALLOCATION - $20,000)
     6             (DESIGN AND CONTINGENCIES - $60,000)
     7         (6)  SOUTHAMPTON TOWNSHIP, T-314, WITMER
     8             ROAD BRIDGE OVER YELLOW BREECHES CREEK,
     9             BRIDGE REPLACEMENT                            140,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $90,000)
    12             (LAND ALLOCATION - $10,000)
    13             (DESIGN AND CONTINGENCIES - $40,000)
    14         (7)  SOUTHAMPTON TOWNSHIP, T-319, GUTSHALL
    15             ROAD BRIDGE OVER YELLOW BREECHES CREEK,
    16             BRIDGE REPLACEMENT                            135,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $90,000)
    19             (LAND ALLOCATION - $5,000)
    20             (DESIGN AND CONTINGENCIES - $40,000)
    21     (B)  STATE BRIDGES
    22         (1)  S.R.4021, BLOSERVILLE ROAD OVER
    23             CONODOQUINET CREEK, UPPER FRANKFORD
    24             TOWNSHIP, BRIDGE REPLACEMENT                  821,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $732,000)
    27             (LAND ALLOCATION - $26,000)
    28             (DESIGN AND CONTINGENCIES - $63,000)
    29         (2)  S.R.0011 AND 0015, 3 BRIDGES OVER THE
    30             HARRISBURG EXPRESSWAY, CONRAIL AND
    19910H1959B3288                 - 63 -

     1             GETTYSBURG ROAD, CAMP HILL BOROUGH,
     2             EAST PENNSBORO AND LOWER ALLEN
     3             TOWNSHIPS, BRIDGE REHABILITATION            6,690,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $5,600,000)
     6             (LAND ALLOCATION - $250,000)
     7             (DESIGN AND CONTINGENCIES - $840,000)
     8  SECTION 26.  DAUPHIN COUNTY.
     9     (A)  LOCAL BRIDGES
    10         (1)  HALIFAX TOWNSHIP, T-563, COUNTY BRIDGE
    11             NO.10, RIDGE ROAD OVER ARMSTRONG CREEK,
    12             BRIDGE REPLACEMENT                            197,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $170,000)
    15             (LAND ALLOCATION - $10,000)
    16             (DESIGN AND CONTINGENCIES - $17,000)
    17         (2)  JEFFERSON TOWNSHIP, T-551, COUNTY
    18             BRIDGE NO.13, BACK ROAD OVER SOUTH FORK
    19             OF POWELLS CREEK, BRIDGE REPLACEMENT          305,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $235,000)
    22             (LAND ALLOCATION - $10,0000)
    23             (DESIGN AND CONTINGENCIES - $60,000)
    24         (3)  MIDDLE PAXTON TOWNSHIP, T-304, COUNTY
    25             BRIDGE NO.23, RED HILL ROAD OVER CLARKS
    26             CREEK, BRIDGE REPLACEMENT                     300,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $250,000)
    29             (LAND ALLOCATION - $10,000)
    30             (DESIGN AND CONTINGENCIES - $40,000)
    19910H1959B3288                 - 64 -

     1         (4)  MIDDLE PAXTON TOWNSHIP, T-686, COUNTY
     2             BRIDGE NO.22, SINGER LANE OVER STONEY
     3             CREEK, BRIDGE REPLACEMENT                     449,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $373,000)
     6             (LAND ALLOCATION - $10,000)
     7             (DESIGN AND CONTINGENCIES - $66,000)
     8         (5)  REED TOWNSHIP, T-547, COUNTY BRIDGE
     9             NO.28, SHOOP FARM BRIDGE OVER POWELLS
    10             CREEK, BRIDGE REPLACEMENT                     451,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $375,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $66,000)
    15         (6)  WICONISCO TOWNSHIP, T-707, ARCH STREET
    16             BRIDGE OVER WICONISCO CREEK, BRIDGE
    17             REPLACEMENT                                   339,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $294,000)
    20             (LAND ALLOCATION - $5,000)
    21             (DESIGN AND CONTINGENCIES - $40,000)
    22         (7)  EAST HANOVER TOWNSHIP, T-001, BRIDGE
    23             NO.1 ON JONESTOWN ROAD OVER TRIBUTARY
    24             TO SWATARA CREEK, BRIDGE
    25             REHABILITATION                                150,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $35,000)
    28             (LAND ALLOCATION - $5,000)
    29             (DESIGN AND CONTINGENCIES - $110,000)
    30         (8)  EAST HANOVER TOWNSHIP, T-467, BRIDGE
    19910H1959B3288                 - 65 -

     1             NO.2 ON CARLSON ROAD OVER MANADA CREEK,
     2             BRIDGE REPLACEMENT                            422,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $340,000)
     5             (LAND ALLOCATION - $12,000)
     6             (DESIGN AND CONTINGENCIES - $70,000)
     7         (9)  EAST HANOVER TOWNSHIP, T-471, BRIDGE
     8             NO.3 ON NORTH MEADOW LANE OVER MANADA
     9             CREEK, BRIDGE REPLACEMENT                     315,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $60,000)
    12             (LAND ALLOCATION - $10,000)
    13             (DESIGN AND CONTINGENCIES - $245,000)
    14         (10)  EAST HANOVER TOWNSHIP, T-001, BRIDGE
    15             NO.4 ON JONESTOWN ROAD OVER MANADA
    16             CREEK, BRIDGE REHABILITATION                  285,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $235,000)
    19             (LAND ALLOCATION - $5,000)
    20             (DESIGN AND CONTINGENCIES - $45,000)
    21         (11)  DERRY TOWNSHIP, T-504, PARK BOULEVARD
    22             BRIDGE OVER SPRING CREEK, BRIDGE
    23             REPLACEMENT                                   690,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $550,000)
    26             (LAND ALLOCATION - $40,000)
    27             (DESIGN AND CONTINGENCIES - $100,000)
    28     (B)  STATE BRIDGES
    29         (1)  S.R.0325, CLARKS VALLEY ROAD BRIDGE
    30             OVER CLARKS CREEK, MIDDLE PAXTON
    19910H1959B3288                 - 66 -

     1             TOWNSHIP, BRIDGE REPLACEMENT                1,050,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $900,000)
     4             (LAND ALLOCATION - $25,000)
     5             (DESIGN AND CONTINGENCIES - $125,000)
     6         (2)  S.R.0039, HERSHEY ROAD OVER SWATARA
     7             CREEK, SOUTH HANOVER TOWNSHIP, BRIDGE
     8             REHABILITATION                                476,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $406,000)
    11             (LAND ALLOCATION - $10,000)
    12             (DESIGN AND CONTINGENCIES - $60,000)
    13         (3)  S.R.3018, HERR STREET OVER PAXTON
    14             CREEK, HARRISBURG CITY, BRIDGE
    15             REPLACEMENT                                   915,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $800,000)
    18             (LAND ALLOCATION - $25,000)
    19             (DESIGN AND CONTINGENCIES - $90,000)
    20         (4)  S.R.2026, GREEN HILL ROAD, BRIDGE OVER
    21             TRIBUTARY TO BEAVER CREEK, WEST HANOVER
    22             TOWNSHIP, BRIDGE REPLACEMENT                   60,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $54,000)
    25             (DESIGN AND CONTINGENCIES - $6,000)
    26  SECTION 27.  DELAWARE COUNTY.
    27     (A)  LOCAL BRIDGES (RESERVED)
    28     (B)  STATE BRIDGES
    29         (1)  S.R.0100, CREEK ROAD BRIDGE OVER
    30             HARVEY'S RUN, BIRMINGHAM TOWNSHIP,
    19910H1959B3288                 - 67 -

     1             BRIDGE REHABILITATION                         285,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $200,000)
     4             (LAND ALLOCATION - $50,000)
     5             (DESIGN AND CONTINGENCIES - $35,000)
     6         (2)  S.R.1018, ARDMORE AVENUE BRIDGE OVER
     7             SEPTA, HAVERFORD TOWNSHIP, BRIDGE
     8             REPLACEMENT                                   875,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $750,000)
    11             (LAND ALLOCATION - $50,000)
    12             (DESIGN AND CONTINGENCIES - $75,000)
    13         (3)  S.R.0001, TOWNSHIP LINE ROAD OVER
    14             SEPTA P&W, UPPER DARBY TOWNSHIP, BRIDGE
    15             DECK REHABILITATION                           225,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $214,000)
    18             (DESIGN AND CONTINGENCIES - $11,000)
    19         (4)  S.R.0452, MARKET STREET BRIDGE OVER
    20             AMTRAK, LOWER CHICHESTER TOWNSHIP,
    21             BRIDGE REPLACEMENT                          6,000,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $5,700,000)
    24             (DESIGN AND CONTINGENCIES - $300,000)
    25         (5)  S.R.0013, MCDADE BOULEVARD, BRIDGE
    26             OVER DARBY CREEK, DARBY BOROUGH, BRIDGE
    27             REPLACEMENT                                 1,000,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $815,000)
    30             (LAND ALLOCATION - $100,000)
    19910H1959B3288                 - 68 -

     1             (DESIGN AND CONTINGENCIES - $85,000)
     2  SECTION 28.  ELK COUNTY.
     3     (A)  LOCAL BRIDGES (RESERVED)
     4     (B)  STATE BRIDGES
     5         (1)  S.R.1004 CROOKED CREEK BRIDGE OVER
     6             CROOKED CREEK, JONES TOWNSHIP, BRIDGE
     7             REPLACEMENT                                   775,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $575,000)
    10             (LAND ALLOCATION - $100,000)
    11             (DESIGN AND CONTINGENCIES - $100,000)
    12         (2)  S.R.0219 ROCKEY RUN BRIDGE OVER ROCKEY
    13             RUN, JONES TOWNSHIP, BRIDGE
    14             REPLACEMENT                                   975,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $775,000)
    17             (LAND ALLOCATION - $100,000)
    18             (DESIGN AND CONTINGENCIES - $100,000)
    19         (3)  S.R.0219 GALLAGHER RUN BRIDGE OVER
    20             GALLAGHER RUN, RIDGWAY BOROUGH, BRIDGE
    21             REPLACEMENT                                   975,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $750,000)
    24             (LAND ALLOCATION - $100,000)
    25             (DESIGN AND CONTINGENCIES - $125,000)
    26         (4)  S.R.3002 IRWIN RUN BRIDGE OVER IRWIN
    27             RUN, SPRING CREEK TOWNSHIP, BRIDGE
    28             REPLACEMENT                                   600,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $400,000)
    19910H1959B3288                 - 69 -

     1             (LAND ALLOCATION - $100,000)
     2             (DESIGN AND CONTINGENCIES - $100,000)
     3         (5)  S.R.3002 MILLSTONE CREEK BRIDGE OVER
     4             MILLSTONE CREEK, MILLSTONE TOWNSHIP,
     5             BRIDGE REPLACEMENT                          1,200,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $1,000,000)
     8             (LAND ALLOCATION - $100,000)
     9             (DESIGN AND CONTINGENCIES - $100,000)
    10  SECTION 29.  ERIE COUNTY.
    11     (A)  LOCAL BRIDGES
    12         (1)  CITY OF ERIE, WEST 38TH STREET BRIDGE,
    13             BRIDGE REPLACEMENT                            312,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $282,000)
    16             (DESIGN AND CONTINGENCIES - $30,000)
    17         (2)  CITY OF ERIE, WEST SOUTH STREET
    18             VIADUCT OVER BAY FRONT PARKWAY, BRIDGE
    19             REPLACEMENT                                 4,020,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $3,600,000)
    22             (LAND ALLOCATION - $70,000)
    23             (DESIGN AND CONTINGENCIES - $350,000)
    24         (3)  NORTH EAST TOWNSHIP, T-780, BORT ROAD
    25             BRIDGE OVER CONRAIL RAILROAD, BRIDGE
    26             REPLACEMENT                                   695,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $604,000)
    29             (LAND ALLOCATION - $10,000)
    30             (DESIGN AND CONTINGENCIES - $81,000)
    19910H1959B3288                 - 70 -

     1         (4)  CONNEAUT TOWNSHIP, T-300 OVER
     2             ASHTABULA CREEK, ID NO.25-720303004036,
     3             BRIDGE REPLACEMENT                            165,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $130,000)
     6             (LAND ALLOCATION - $5,000)
     7             (DESIGN AND CONTINGENCIES - $30,000)
     8         (5)  WATERFORD TOWNSHIP, T-463, COVERED
     9             BRIDGE OVER LEBEOUF CREEK, ID NO.25-
    10             722004634003, BRIDGE REPLACEMENT              450,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $380,000)
    13             (LAND ALLOCATION - $20,000)
    14             (DESIGN AND CONTINGENCIES - $50,000)
    15         (6)  CONNEAUT TOWNSHIP, T-360 OVER CONNEAUT
    16             CREEK, ID NO.25-720303604035, BRIDGE
    17             REPLACEMENT                                   160,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $125,000)
    20             (LAND ALLOCATION - $5,000)
    21             (DESIGN AND CONTINGENCIES - $30,000)
    22         (7)  MCKEAN TOWNSHIP, T-448, SKINNER ROAD
    23             OVER ELK CREEK, BRIDGE REPLACEMENT            204,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $164,000)
    26             (LAND ALLOCATION - $20,000)
    27             (DESIGN AND CONTINGENCIES - $20,000)
    28     (B)  STATE BRIDGES
    29         (1)  S.R.3029 ON WEST ROAD OVER BRANCH
    30             TEMPLE CREEK, ELK CREEK TOWNSHIP,
    19910H1959B3288                 - 71 -

     1             BRIDGE REPLACEMENT                            251,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $213,000)
     4             (LAND ALLOCATION - $13,000)
     5             (DESIGN AND CONTINGENCIES - $25,000)
     6         (2)  S.R.3018 ON TANNERY ROAD OVER
     7             INTERSTATE 90, GIRARD TOWNSHIP, BRIDGE
     8             REHABILITATION                              1,200,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $1,020,000)
    11             (LAND ALLOCATION - $60,000)
    12             (DESIGN AND CONTINGENCIES - $120,000)
    13         (3)  S.R.0005 ON EAST LAKE ROAD OVER FOUR
    14             MILE CREEK, LAWRENCE PARK TOWNSHIP,
    15             BRIDGE REPLACEMENT                            350,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $297,000)
    18             (LAND ALLOCATION - $18,000)
    19             (DESIGN AND CONTINGENCIES - $35,000)
    20         (4)  S.R.3020 ON WEST ROAD OVER LAMSON RUN,
    21             MCKEAN TOWNSHIP, BRIDGE REHABILITATION        240,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $205,000)
    24             (LAND ALLOCATION - $10,000)
    25             (DESIGN AND CONTINGENCIES - $25,000)
    26         (5)  S.R.4013 ON DUNN VALLEY ROAD OVER ELK
    27             CREEK, BMS 25401300800214, MCKEAN
    28             TOWNSHIP, BRIDGE REPLACEMENT                  320,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $270,000)
    19910H1959B3288                 - 72 -

     1             (LAND ALLOCATION - $15,000)
     2             (DESIGN AND CONTINGENCIES - $35,000)
     3         (6)  S.R.3008 ON CRANE ROAD OVER TROUT RUN,
     4             WASHINGTON TOWNSHIP, BRIDGE
     5             REHABILITATION                                270,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $229,000)
     8             (LAND ALLOCATION - $14,000)
     9             (DESIGN AND CONTINGENCIES - $27,000)
    10         (7)  S.R.3025 ON CONNEAUTTEE VALLEY ROAD
    11             OVER CUMMINGS CREEK, WASHINGTON
    12             TOWNSHIP, BRIDGE REPLACEMENT                  190,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $160,000)
    15             (LAND ALLOCATION - $10,000)
    16             (DESIGN AND CONTINGENCIES - $20,000)
    17  SECTION 30.  FAYETTE COUNTY.
    18     (A)  LOCAL BRIDGES
    19         (1)  NORTH UNION TOWNSHIP, AUTO AUCTION
    20             BRIDGE, OLD ROUTE 51, BRIDGE REMOVAL          117,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $100,000)
    23             (LAND ALLOCATION - $5,000)
    24             (DESIGN AND CONTINGENCIES - $12,000)
    25         (2)  NORTH UNION TOWNSHIP, OLD ROUTE 51
    26             BRIDGE, NORTH OF AUTO AUCTION, BRIDGE
    27             REMOVAL                                       117,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $100,000)
    30             (LAND ALLOCATION - $5,000)
    19910H1959B3288                 - 73 -

     1             (DESIGN AND CONTINGENCIES - $12,000)
     2     (B)  STATE BRIDGES
     3         (1)  S.R.0166, FRIENDSHIP HILL BRIDGE OVER
     4             GEORGES CREEK, SPRINGHILL AND NICHOLSON
     5             TOWNSHIPS, BRIDGE REPLACEMENT                 975,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $863,000)
     8             (LAND ALLOCATION - $30,000)
     9             (DESIGN AND CONTINGENCIES - $82,000)
    10         (2)  S.R.1037, PITTSBURGH STREET OVER TRUMP
    11             RUN, CITY OF CONNELLSVILLE, BRIDGE
    12             REPLACEMENT                                   650,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $575,000)
    15             (LAND ALLOCATION - $20,000)
    16             (DESIGN AND CONTINGENCIES - $55,000)
    17         (3)  S.R.1058, ROARING RUN BRIDGE OVER
    18             ROARING RUN, DONEGAL TOWNSHIP, BRIDGE
    19             REPLACEMENT                                   580,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $490,000)
    22             (LAND ALLOCATION - $40,000)
    23             (DESIGN AND CONTINGENCIES - $50,000)
    24         (4)  S.R.2007, STONY RUN BRIDGE OVER STONY
    25             RUN, WHARTON TOWNSHIP, BRIDGE
    26             REPLACEMENT                                   400,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $335,000)
    29             (LAND ALLOCATION - $30,000)
    30             (DESIGN AND CONTINGENCIES - $35,000)
    19910H1959B3288                 - 74 -

     1  SECTION 31.  FOREST COUNTY.
     2     (A)  LOCAL BRIDGES
     3         (1)  TIONESTA TOWNSHIP, T-316 ON HEMLOCK
     4             ROAD OVER HEMLOCK CREEK, BRIDGE
     5             REPLACEMENT                                   110,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $88,000)
     8             (LAND ALLOCATION - $11,000)
     9             (DESIGN AND CONTINGENCIES - $11,000)
    10     (B)  STATE BRIDGES
    11         (1)  S.R.1003, BLUE JAY CREEK BRIDGE OVER
    12             BLUE JAY CREEK, HOWE TOWNSHIP, BRIDGE
    13             REPLACEMENT                                   340,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $280,000)
    16             (LAND ALLOCATION - $25,000)
    17             (DESIGN AND CONTINGENCIES - $35,000)
    18         (2)  S.R.4005 ON OLD TRAFFIC ROUTE 62 OVER
    19             PRATHER CREEK, HICKORY TOWNSHIP, BRIDGE
    20             REPLACEMENT                                   271,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $230,000)
    23             (LAND ALLOCATION - $14,000)
    24             (DESIGN AND CONTINGENCIES - $27,000)
    25  SECTION 32.  FRANKLIN COUNTY.
    26     (A)  LOCAL BRIDGES (RESERVED)
    27     (B)  STATE BRIDGES
    28         (1)  S.R.0016, MEMORIAL BRIDGE UNDER
    29             WESTERN MARYLAND RAILROAD, CHAMBERSBURG
    30             BOROUGH, OVERPASS WIDENING                    700,000
    19910H1959B3288                 - 75 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $564,000)
     3             (LAND ALLOCATION - $68,000)
     4             (DESIGN AND CONTINGENCIES - $68,000)
     5  SECTION 33.  FULTON COUNTY (RESERVED).
     6  SECTION 34.  GREENE COUNTY.
     7     (A)  LOCAL BRIDGES
     8         (1)  RICHHILL TOWNSHIP, ROUTE 356 BRIDGE
     9             NO.57 OVER NORTH FORK CREEK, BRIDGE
    10             REPLACEMENT                                   450,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $350,000)
    13             (LAND ALLOCATION - $50,000)
    14             (DESIGN AND CONTINGENCIES - $50,000)
    15         (2)  SPRINGHILL TOWNSHIP, ROUTE 345 BRIDGE
    16             NO.68 OVER FORK CREEK, BRIDGE
    17             REPLACEMENT                                   550,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $450,000)
    20             (LAND ALLOCATION - $50,000)
    21             (DESIGN AND CONTINGENCIES - $50,000)
    22         (3)  PERRY TOWNSHIP, ROUTE 385 BRIDGE NO.7
    23             OVER SHANNON RUN, BRIDGE REPLACEMENT          180,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $150,000)
    26             (LAND ALLOCATION - $15,000)
    27             (DESIGN AND CONTINGENCIES - $15,000)
    28         (4)  GILMORE TOWNSHIP, ROUTE 379 BRIDGE
    29             NO.53 OVER BLOCKHOUSE RUN, BRIDGE
    30             REPLACEMENT                                   180,000
    19910H1959B3288                 - 76 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $150,000)
     3             (LAND ALLOCATION - $15,000)
     4             (DESIGN AND CONTINGENCIES - $15,000)
     5         (5)  PERRY TOWNSHIP, ROUTE 357 BRIDGE NO.8
     6             OVER SHANNON RUN, BRIDGE REPLACEMENT          260,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $200,000)
     9             (LAND ALLOCATION - $30,000)
    10             (DESIGN AND CONTINGENCIES - $30,000)
    11         (6)  JACKSON TOWNSHIP, ROUTE 447 BRIDGE
    12             NO.56 OVER JOB CREEK, BRIDGE
    13             REPLACEMENT                                   260,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $200,000)
    16             (LAND ALLOCATION - $30,000)
    17             (DESIGN AND CONTINGENCIES - $30,000)
    18         (7)  MORGAN TOWNSHIP, ROUTE 568 BRIDGE
    19             NO.23 OVER RUFF CREEK, BRIDGE
    20             REPLACEMENT                                    12,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $12,000)
    23         (8)  CUMBERLAND TOWNSHIP, ROUTE 674 BRIDGE
    24             NO.10 OVER MUDDY RUN, BRIDGE
    25             REPLACEMENT                                   425,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $325,000)
    28             (LAND ALLOCATION - $50,000)
    29             (DESIGN AND CONTINGENCIES - $50,000)
    30         (9)  GREENE TOWNSHIP, ROUTE 604 BRIDGE
    19910H1959B3288                 - 77 -

     1             NO.18 OVER WHITELEY CREEK, BRIDGE
     2             REPLACEMENT                                    12,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $12,000)
     5         (10)  CARMICHAELS BOROUGH, BRIDGE NO.11 OLD
     6             TOWN STREET OVER MUDDY RUN, BRIDGE
     7             CONSTRUCTION                                   12,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $12,000)
    10         (11)  FREEPORT TOWNSHIP, ROUTE 362 BRIDGE
    11             NO.67 OVER FISH CREEK, BRIDGE
    12             REPLACEMENT                                   450,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $350,000)
    15             (LAND ALLOCATION - $50,000)
    16             (DESIGN AND CONTINGENCIES - $50,000)
    17         (12)  CENTER TOWNSHIP, ROUTE 469 BRIDGE
    18             NO.65 OVER GRINGE RUN, BRIDGE
    19             REPLACEMENT                                   450,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $350,000)
    22             (LAND ALLOCATION - $50,000)
    23             (DESIGN AND CONTINGENCIES - $50,000)
    24         (13)  WASHINGTON TOWNSHIP, ROUTE 546 BRIDGE
    25             NO.24 OVER RUFF CREEK, BRIDGE
    26             REPLACEMENT                                    12,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $12,000)
    29         (14)  CENTER TOWNSHIP, ROUTE 487 BRIDGE
    30             NO.42 OVER PURSLEY CREEK, BRIDGE
    19910H1959B3288                 - 78 -

     1             REPLACEMENT                                    12,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $12,000)
     4         (15)  CENTER TOWNSHIP, ROUTE 424 BRIDGE
     5             NO.60 OVER SOUTH FORK OF TEN MILE
     6             CREEK, BRIDGE REPLACEMENT                      12,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $12,000)
     9         (16)  WASHINGTON TOWNSHIP, ROUTE 550 BRIDGE
    10             NO.27 OVER CRAYNES RUN, BRIDGE
    11             REPLACEMENT                                   400,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $300,000)
    14             (LAND ALLOCATION - $50,000)
    15             (DESIGN AND CONTINGENCIES - $50,000)
    16         (17)  WAYNE TOWNSHIP, ROUTE 371 BRIDGE
    17             NO.38 OVER HOOVERS RUN, BRIDGE
    18             REPLACEMENT                                    12,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $12,000)
    21         (18)  CENTER TOWNSHIP, ROUTE 511 BRIDGE
    22             NO.43 OVER PURSLEY CREEK, BRIDGE
    23             REPLACEMENT                                   425,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $325,000)
    26             (LAND ALLOCATION - $50,000)
    27             (DESIGN AND CONTINGENCIES - $50,000)
    28         (19)  CENTER TOWNSHIP, ROUTE 454 BRIDGE
    29             NO.85 OVER HARGUS CREEK, BRIDGE
    30             REPLACEMENT                                    12,000
    19910H1959B3288                 - 79 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $12,000)
     3         (20)  RICHHILL TOWNSHIP, ROUTE 346 BRIDGE
     4             NO.78 OVER OWENS RUN, BRIDGE
     5             REPLACEMENT                                   425,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $325,000)
     8             (LAND ALLOCATION - $50,000)
     9             (DESIGN AND CONTINGENCIES - $50,000)
    10         (21)  WAYNE TOWNSHIP, ROUTE 490 BRIDGE
    11             NO.37 OVER ROBERTS RUN, BRIDGE
    12             REPLACEMENT                                   140,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $100,000)
    15             (LAND ALLOCATION - $20,000)
    16             (DESIGN AND CONTINGENCIES - $20,000)
    17         (22)  CUMBERLAND TOWNSHIP, T-674, COUNTY
    18             BRIDGE NO.10, OVER MUDDY RUN, BRIDGE
    19             REPLACEMENT                                   489,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $443,000)
    22             (LAND ALLOCATION - $5,000)
    23             (DESIGN AND CONTINGENCIES - $41,000)
    24     (B)  STATE BRIDGES
    25         (1)  S.R.0188, COUNTY MAINTENANCE BUILDING,
    26             BRIDGE REPLACEMENT                            875,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $750,000)
    29             (LAND ALLOCATION - $50,000)
    30             (DESIGN AND CONTINGENCIES - $75,000)
    19910H1959B3288                 - 80 -

     1         (2)  S.R.2016 OVER WHITELEY CREEK,
     2             MONONGAHELA TOWNSHIP, BRIDGE
     3             REPLACEMENT                                   550,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $500,000)
     6             (DESIGN AND CONTINGENCIES - $50,000)
     7         (3)  S.R.3001 ENSLOW FORK BRIDGE, RICHHILL
     8             TOWNSHIP, BRIDGE REPLACEMENT                  450,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $400,000)
    11             (DESIGN AND CONTINGENCIES - $50,000)
    12         (4)  S.R.4033 SWARTZ BRIDGE, WASHINGTON
    13             TOWNSHIP, BRIDGE REPLACEMENT                  250,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $200,000)
    16             (DESIGN AND CONTINGENCIES - $50,000)
    17         (5)  S.R.0018 TEN MILE CREEK BRIDGE NO.3,
    18             BRIDGE REPLACEMENT                            550,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $500,000)
    21             (DESIGN AND CONTINGENCIES - $50,000)
    22         (6)  S.R.0088 DUNKARD CREEK BRIDGE,
    23             DILLINER, BRIDGE REPLACEMENT                1,150,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $1,000,000)
    26             (LAND ALLOCATION - $50,000)
    27             (DESIGN AND CONTINGENCIES - $100,000)
    28         (7)  S.R.0188 SEGMENT 130 OFFSET 1860 TO
    29             SEGMENT 130 OFFSET 1933, BELLS BRIDGE,
    30             BRIDGE REPLACEMENT                            550,000
    19910H1959B3288                 - 81 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $500,000)
     3             (DESIGN AND CONTINGENCIES - $50,000)
     4         (8)  S.R.0021, TEN MILE CREEK BRIDGE WEST
     5             OVER TEN MILE CREEK, CENTER TOWNSHIP,
     6             BRIDGE REPLACEMENT                            194,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $160,000)
     9             (LAND ALLOCATION - $10,000)
    10             (DESIGN AND CONTINGENCIES - $24,000)
    11         (9)  S.R.3009, HOOVER'S RUN BRIDGE OVER
    12             HOOVER'S RUN, WAYNE TOWNSHIP, BRIDGE
    13             REPLACEMENT                                   375,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $320,000)
    16             (LAND ALLOCATION - $20,000)
    17             (DESIGN AND CONTINGENCIES - $35,000)
    18         (10)  S.R.3013, BELLS RUN BRIDGE OVER BELLS
    19             RUN, WAYNE TOWNSHIP, BRIDGE
    20             REPLACEMENT                                   275,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $225,000)
    23             (LAND ALLOCATION - $20,000)
    24             (DESIGN AND CONTINGENCIES - $30,000)
    25         (11)  S.R.3013, BULLDOG RUN BRIDGE OVER
    26             LITTLE RUN, WAYNE TOWNSHIP, BRIDGE
    27             REPLACEMENT                                   280,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $230,000)
    30             (LAND ALLOCATION - $20,000)
    19910H1959B3288                 - 82 -

     1             (DESIGN AND CONTINGENCIES - $30,000)
     2  SECTION 35.  HUNTINGDON COUNTY.
     3     (A)  LOCAL BRIDGES
     4         (1)  CLAY TOWNSHIP, T-341, WATKINS BRIDGE
     5             OVER THREE SPRINGS CREEK, BRIDGE
     6             REPLACEMENT                                   620,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $496,000)
     9             (LAND ALLOCATION - $31,000)
    10             (DESIGN AND CONTINGENCIES - $93,000)
    11     (B)  STATE BRIDGES (RESERVED)
    12  SECTION 36.  INDIANA COUNTY.
    13     (A)  LOCAL BRIDGES
    14         (1)  GREEN TOWNSHIP, T-678, DIXON RUN
    15             BRIDGE OVER DIXON RUN, BRIDGE
    16             REPLACEMENT                                   258,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $225,000)
    19             (LAND ALLOCATION - $8,000)
    20             (DESIGN AND CONTINGENCIES - $25,000)
    21         (2)  CENTER TOWNSHIP, T-680, CORAL BRIDGE
    22             OVER TWO LICK CREEK, BRIDGE
    23             REPLACEMENT                                   600,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $480,000)
    26             (LAND ALLOCATION - $60,000)
    27             (DESIGN AND CONTINGENCIES - $60,000)
    28         (3)  PLUMVILLE BOROUGH, T-840, PLUMVILLE
    29             BRIDGE OVER PLUM CREEK, BRIDGE
    30             REPLACEMENT                                   300,000
    19910H1959B3288                 - 83 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $240,000)
     3             (LAND ALLOCATION - $30,000)
     4             (DESIGN AND CONTINGENCIES - $30,000)
     5         (4)  RAYNE TOWNSHIP, T-611, BRIDGE OVER
     6             PINE RUN, BRIDGE REPLACEMENT                  250,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $200,000)
     9             (LAND ALLOCATION - $25,000)
    10             (DESIGN AND CONTINGENCIES - $25,000)
    11         (5)  GRANT TOWNSHIP, T-851, BRIDGE OVER
    12             EAST RUN, BRIDGE REPLACEMENT                  250,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $200,000)
    15             (LAND ALLOCATION - $25,000)
    16             (DESIGN AND CONTINGENCIES - $25,000)
    17         (6)  BLAIRSVILLE BOROUGH, RANSON ROAD OVER
    18             CONRAIL, BRIDGE REPLACEMENT                   550,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $500,000)
    21             (LAND ALLOCATION - $10,000)
    22             (DESIGN AND CONTINGENCIES - $40,000)
    23         (7)  BLACKLICK TOWNSHIP, T-460, ARCH BRIDGE
    24             OVER AULTMANS RUN, BRIDGE REPLACEMENT         243,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $200,000)
    27             (LAND ALLOCATION - $8,000)
    28             (DESIGN AND CONTINGENCIES - $35,000)
    29         (8)  BURRELL TOWNSHIP, T-660, BLACKLICK
    30             CREEK BRIDGE OVER BLACKLICK CREEK,
    19910H1959B3288                 - 84 -

     1             BRIDGE REPLACEMENT                          1,010,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $900,000)
     4             (LAND ALLOCATION - $30,000)
     5             (DESIGN AND CONTINGENCIES - $80,000)
     6         (9)  BLACKLICK TOWNSHIP, T-460, MCKEE
     7             BRIDGE OVER AULTMANS RUN, BRIDGE
     8             REPLACEMENT                                   288,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $240,000)
    11             (LAND ALLOCATION - $8,000)
    12             (DESIGN AND CONTINGENCIES - $40,000)
    13         (10)  BLACKLICK TOWNSHIP, T-660, AULTMANS
    14             RUN BRIDGE OVER AULTMANS RUN, BRIDGE
    15             REPLACEMENT                                   301,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $250,000)
    18             (LAND ALLOCATION - $8,000)
    19             (DESIGN AND CONTINGENCIES - $43,000)
    20         (11)  SALTSBURG BOROUGH, HIGH STREET BRIDGE
    21             OVER DEEP RAVINE, BRIDGE REPLACEMENT          600,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $545,000)
    24             (LAND ALLOCATION - $15,000)
    25             (DESIGN AND CONTINGENCIES - $40,000)
    26         (12)  CLYMER BOROUGH, WILSON STREET BRIDGE
    27             OVER DIXON RUN, BRIDGE REPLACEMENT            305,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $250,000)
    30             (LAND ALLOCATION - $10,000)
    19910H1959B3288                 - 85 -

     1             (DESIGN AND CONTINGENCIES - $45,000)
     2         (13)  CREEKSIDE BOROUGH, CANEVA STREET
     3             MCKEE BRIDGE OVER MCKEE RUN, BRIDGE
     4             REPLACEMENT                                   400,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $352,000)
     7             (LAND ALLOCATION - $8,000)
     8             (DESIGN AND CONTINGENCIES - $40,000)
     9         (14)  ADAMS TOWNSHIP, T-382, GLADE RUN
    10             BRIDGE OVER GLADE RUN, BRIDGE
    11             REPLACEMENT                                   520,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $470,000)
    14             (LAND ALLOCATION - $15,000)
    15             (DESIGN AND CONTINGENCIES - $35,000)
    16         (15)  ARMSTRONG TOWNSHIP, T-414, THOMAS
    17             BRIDGE OVER CROOKED CREEK, BRIDGE
    18             REPLACEMENT                                   550,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $465,000)
    21             (LAND ALLOCATION - $20,000)
    22             (DESIGN AND CONTINGENCIES - $65,000)
    23     (B)  STATE BRIDGES
    24         (1)  S.R.3031, AULTMANS RUN BRIDGE OVER
    25             AULTMANS RUN, BLACKLICK TOWNSHIP,
    26             BRIDGE REPLACEMENT                            265,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $220,000)
    29             (LAND ALLOCATION - $15,000)
    30             (DESIGN AND CONTINGENCIES - $30,000)
    19910H1959B3288                 - 86 -

     1         (2)  S.R.0022, BLAIRSVILLE EAST, BURRELL
     2             TOWNSHIP, BRIDGE REPLACEMENT                8,910,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $8,710,000)
     5             (DESIGN AND CONTINGENCIES - $200,000)
     6         (3)  S.R.0108, WOLFE RUN BRIDGE OVER WOLFE
     7             RUN, WORTH TOWNSHIP, BRIDGE
     8             REPLACEMENT                                   131,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $100,000)
    11             (LAND ALLOCATION - $30,000)
    12             (DESIGN AND CONTINGENCIES - $1,000)
    13         (4)  S.R.0022, BLAIRSVILLE EAST, BURRELL
    14             TOWNSHIP BRIDGE REPLACEMENT                   200,000
    15             (DESIGN AND CONTINGENCIES - $200,000)
    16         (5)  S.R.0259, BOLIVAR BRIDGE OVER
    17             CONEMAUGH RIVER, PARKINSON AND BOLIVAR
    18             BOROUGHS, BRIDGE REPLACEMENT                  550,000
    19             (DESIGN AND CONTINGENCIES - $550,000)
    20         (6)  S.R.3029, WHISKEY RUN BRIDGE OVER
    21             WHISKEY RUN, YOUNG TOWNSHIP, BRIDGE
    22             REPLACEMENT                                   503,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $458,000)
    25             (LAND ALLOCATION - $5,000)
    26             (DESIGN AND CONTINGENCIES - $40,000)
    27  SECTION 37.  JEFFERSON COUNTY.
    28     (A)  LOCAL BRIDGES
    29         (1)  BARNETT TOWNSHIP, T-365, CATHERS RUN
    30             BRIDGE OVER CATHERS RUN, BRIDGE
    19910H1959B3288                 - 87 -

     1             REPLACEMENT                                   435,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $380,000)
     4             (LAND ALLOCATION - $10,000)
     5             (DESIGN AND CONTINGENCIES - $45,000)
     6         (2)  ELDRED TOWNSHIP, T-342, MILL CREEK
     7             BRIDGE OVER MILL CREEK, BRIDGE
     8             REPLACEMENT                                   360,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $312,000)
    11             (LAND ALLOCATION - $8,000)
    12             (DESIGN AND CONTINGENCIES - $40,000)
    13         (3)  ROSE TOWNSHIP, T-567, CODER RUN BRIDGE
    14             OVER CODER RUN, BRIDGE REPLACEMENT            405,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $347,000)
    17             (LAND ALLOCATION - $8,000)
    18             (DESIGN AND CONTINGENCIES - $50,000)
    19     (B)  STATE BRIDGES
    20         (1)  S.R.3033, FIVE MILE RUN BRIDGE OVER
    21             FIVE MILE RUN, KNOX TOWNSHIP, BRIDGE
    22             REPLACEMENT                                   420,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $370,000)
    25             (LAND ALLOCATION - $10,000)
    26             (DESIGN AND CONTINGENCIES - $40,000)
    27         (2)  S.R.3033, SANDY LICK CREEK BRIDGE OVER
    28             SANDY LICK CREEK, BROOKVILLE BOROUGH,
    29             BRIDGE REPLACEMENT                          1,000,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19910H1959B3288                 - 88 -

     1             $800,000)
     2             (LAND ALLOCATION - $75,000)
     3             (DESIGN AND CONTINGENCIES - $125,000)
     4  SECTION 38.  JUNIATA COUNTY.
     5     (A)  LOCAL BRIDGES
     6         (1)  DELAWARE TOWNSHIP, T-405, DELAWARE
     7             CREEK BRIDGE, BRIDGE REPLACEMENT              165,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $155,000)
    10             (LAND ALLOCATION - $10,000)
    11     (B)  STATE BRIDGES
    12         (1)  S.R.0035, BRIDGE OVER CONRAIL, MIFFLIN
    13             BOROUGH, BRIDGE REPLACEMENT                 1,600,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $1,300,000)
    16             (LAND ALLOCATION - $150,000)
    17             (DESIGN AND CONTINGENCIES - $150,000)
    18         (2)  S.R.0035, BRIDGE OVER COCOLAMUS CREEK,
    19             MONROE TOWNSHIP, BRIDGE REPLACEMENT         1,300,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $1,000,000)
    22             (LAND ALLOCATION - $150,000)
    23             (DESIGN AND CONTINGENCIES - $150,000)
    24         (3)  S.R.0035, BRIDGE OVER COCOLAMUS CREEK,
    25             FAYETTE TOWNSHIP, BRIDGE REPLACEMENT          650,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $450,000)
    28             (LAND ALLOCATION - $100,000)
    29             (DESIGN AND CONTINGENCIES - $100,000)
    30         (4)  S.R.0075, BRIDGE OVER HUNTER'S CREEK,
    19910H1959B3288                 - 89 -

     1             TURBETT TOWNSHIP, BRIDGE REPLACEMENT        4,200,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $3,500,000)
     4             (LAND ALLOCATION - $300,000)
     5             (DESIGN AND CONTINGENCIES - $400,000)
     6         (5)  S.R.0075, BRIDGE OVER TUSCARORA CREEK,
     7             TURBETT TOWNSHIP, BRIDGE REPLACEMENT        2,550,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $2,200,000)
    10             (LAND ALLOCATION - $150,000)
    11             (DESIGN AND CONTINGENCIES - $200,000)
    12         (6)  S.R.0075, BRIDGE OVER CONRAIL, WALKER
    13             TOWNSHIP, BRIDGE REPLACEMENT                3,000,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $2,500,000)
    16             (LAND ALLOCATION - $200,000)
    17             (DESIGN AND CONTINGENCIES - $300,000)
    18         (7)  S.R.0235, BRIDGE OVER STONEY RUN,
    19             GREENWOOD TOWNSHIP, BRIDGE REPLACEMENT        850,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $650,000)
    22             (LAND ALLOCATION - $100,000)
    23             (DESIGN AND CONTINGENCIES - $100,000)
    24         (8)  S.R.0333, BRIDGE OVER TRIBUTARY OF
    25             JUNIATA RIVER, TURBETT TOWNSHIP, BRIDGE
    26             REPLACEMENT                                   500,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $300,000)
    29             (LAND ALLOCATION - $100,000)
    30             (DESIGN AND CONTINGENCIES - $100,000)
    19910H1959B3288                 - 90 -

     1         (9)  S.R.1001, BRIDGE OVER LOST RUN,
     2             FERMANAGH TOWNSHIP, BRIDGE REPLACEMENT        800,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $600,000)
     5             (LAND ALLOCATION - $100,000)
     6             (DESIGN AND CONTINGENCIES - $100,000)
     7         (10)  S.R.1006, BRIDGE OVER HORNING RUN,
     8             FERMANAGH TOWNSHIP, BRIDGE REPLACEMENT        725,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $500,000)
    11             (LAND ALLOCATION - $100,000)
    12             (DESIGN AND CONTINGENCIES - $125,000)
    13         (11)  S.R.1006, BRIDGE NO.2 OVER HORNING
    14             RUN, FERMANAGH TOWNSHIP, BRIDGE
    15             REPLACEMENT                                   725,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $500,000)
    18             (LAND ALLOCATION - $100,000)
    19             (DESIGN AND CONTINGENCIES - $125,000)
    20         (12)  S.R.2010, BRIDGE OVER COCOLAMUS
    21             CREEK, DELAWARE TOWNSHIP, BRIDGE
    22             REPLACEMENT                                   900,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $675,000)
    25             (LAND ALLOCATION - $100,000)
    26             (DESIGN AND CONTINGENCIES - $125,000)
    27         (13)  S.R.2019, BRIDGE OVER CRANES RUN,
    28             GREENWOOD TOWNSHIP, BRIDGE REPLACEMENT        650,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $450,000)
    19910H1959B3288                 - 91 -

     1             (LAND ALLOCATION - $100,000)
     2             (DESIGN AND CONTINGENCIES - $100,000)
     3         (14)  S.R.3031, CONNECTOR BRIDGE ACCESS TO
     4             S.R.0075, PORT ROYAL BOROUGH, BRIDGE
     5             REPLACEMENT                                 1,125,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $750,000)
     8             (LAND ALLOCATION - $200,000)
     9             (DESIGN AND CONTINGENCIES - $175,000)
    10  SECTION 39.  LACKAWANNA COUNTY.
    11     (A)  LOCAL BRIDGES
    12         (1)  MAYFIELD BOROUGH, CHESTNUT STREET
    13             BRIDGE OVER LACKAWANNA RIVER PI
    14             NO.043591229, BRIDGE REPLACEMENT            1,360,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $1,200,000)
    17             (LAND ALLOCATION - $10,000)
    18             (DESIGN AND CONTINGENCIES - $150,000)
    19         (2)  ARCHBALD BOROUGH, WAYNE STREET BRIDGE
    20             OVER LACKAWANNA RIVER PI NO.043591230,
    21             BRIDGE REPLACEMENT                          1,520,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $1,350,000)
    24             (LAND ALLOCATION - $10,000)
    25             (DESIGN AND CONTINGENCIES - $160,000)
    26         (3)  CITY OF SCRANTON, ASH STREET BRIDGE
    27             OVER ROARING BROOK, BRIDGE REPLACEMENT        900,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $800,000)
    30             (LAND ALLOCATION - $10,000)
    19910H1959B3288                 - 92 -

     1             (DESIGN AND CONTINGENCIES - $90,000)
     2         (4)  CITY OF SCRANTON, POCONO N.E.R.R.
     3             CULVERT OVER MEADOW BROOK, BRIDGE
     4             REPLACEMENT                                   180,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $150,000)
     7             (LAND ALLOCATION - $10,000)
     8             (DESIGN AND CONTINGENCIES - $20,000)
     9     (B)  STATE BRIDGES
    10         (1)  S.R.0106 OVER FALL BROOK PI
    11             NO.043591226, FELL TOWNSHIP, BRIDGE
    12             REPLACEMENT                                   880,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $775,000)
    15             (LAND ALLOCATION - $10,000)
    16             (DESIGN AND CONTINGENCIES - $95,000)
    17         (2)  S.R.0106 OVER TUNKHANNOCK CREEK PI
    18             NO.043591227, GREENFIELD TOWNSHIP,
    19             BRIDGE REPLACEMENT                            685,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $600,000)
    22             (LAND ALLOCATION - $10,000)
    23             (DESIGN AND CONTINGENCIES - $75,000)
    24         (3)  S.R.0435 OVER CONRAIL RAILROAD PI
    25             NO.043591225, ELMHURST TOWNSHIP, BRIDGE
    26             REPLACEMENT                                 4,520,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $4,000,000)
    29             (LAND ALLOCATION - $20,000)
    30             (DESIGN AND CONTINGENCIES - $500,000)
    19910H1959B3288                 - 93 -

     1         (4)  S.R.2016 OVER PONDS CREEK, LEHIGH
     2             TOWNSHIP, BRIDGE REPLACEMENT                  486,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $425,000)
     5             (LAND ALLOCATION - $10,000)
     6             (DESIGN AND CONTINGENCIES - $51,000)
     7         (5)  S.R.0435 OVER S.R.0348 PI
     8             NO.043591228, ROARING BROOK TOWNSHIP,
     9             BRIDGE REPLACEMENT                            750,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $660,000)
    12             (LAND ALLOCATION - $ 10,000)
    13             (DESIGN AND CONTINGENCIES - $80,000)
    14         (6)  S.R.0006 OVER BRANCH LEGGETTS CREEK PI
    15             NO.04359122, SOUTH ABINGTON TOWNSHIP,
    16             BRIDGE REPLACEMENT                          1,000,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $884,000)
    19             (LAND ALLOCATION - $10,000)
    20             (DESIGN AND CONTINGENCIES - $106,000)
    21         (7)  S.R.2016 OVER STEGMEIR'S POND, LEHIGH
    22             TOWNSHIP, BRIDGE REPLACEMENT                  221,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $188,000)
    25             (LAND ALLOCATION - $10,000)
    26             (DESIGN AND CONTINGENCIES - $23,000)
    27         (8)  S.R.4019 OVER BRANCH LEGGETTS CREEK PI
    28             NO.04359128, ABINGTON TOWNSHIP, BRIDGE
    29             REPLACEMENT                                   405,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19910H1959B3288                 - 94 -

     1             $353,000)
     2             (LAND ALLOCATION - $10,000)
     3             (DESIGN AND CONTINGENCIES - $42,000)
     4         (9)  S.R.0407 OVER ACKERLEY CREEK PI
     5             NO.043591207, ABINGTON TOWNSHIP, BRIDGE
     6             REPLACEMENT                                   653,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $574,000)
     9             (LAND ALLOCATION - $10,000)
    10             (DESIGN AND CONTINGENCIES - $69,000)
    11         (10)  S.R.1017 OVER CHAPMAN LAKE STREAM PI
    12             NO.043591209, SCOTT TOWNSHIP, BRIDGE
    13             REPLACEMENT                                   558,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $489,000)
    16             (LAND ALLOCATION - $10,000)
    17             (DESIGN AND CONTINGENCIES - $59,000)
    18         (11)  S.R.1029 OVER HULLS CREEK PI
    19             NO.043591210, SCOTT TOWNSHIP, BRIDGE
    20             REPLACEMENT                                   518,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $453,000)
    23             (LAND ALLOCATION - $10,000)
    24             (DESIGN AND CONTINGENCIES - $55,000)
    25         (12)  S.R.2004 OVER KELLUM CREEK PI
    26             NO.04359121, MADISON TOWNSHIP, BRIDGE
    27             REPLACEMENT                                   335,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $290,000)
    30             (LAND ALLOCATION - $10,000)
    19910H1959B3288                 - 95 -

     1             (DESIGN AND CONTINGENCIES - $35,000)
     2         (13)  S.R.0006 OVER BRANCH OF LEGGETTS
     3             CREEK PI NO.043591221, SOUTH ABINGTON
     4             TOWNSHIP, BRIDGE REPLACEMENT                  778,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $686,000)
     7             (LAND ALLOCATION - $10,000)
     8             (DESIGN AND CONTINGENCIES - $82,000)
     9         (14)  S.R.3005 OVER GARDNERS CREEK PI
    10             NO.043591215, RANSOM TOWNSHIP, BRIDGE
    11             REPLACEMENT                                   683,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $601,000)
    14             (LAND ALLOCATION - $10,000)
    15             (DESIGN AND CONTINGENCIES - $72,000)
    16         (15)  S.R.2016 OVER PONDS CREEK PI
    17             NO.043591214, LEHIGH TOWNSHIP, BRIDGE
    18             REPLACEMENT                                   486,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $425,000)
    21             (LAND ALLOCATION - $10,000)
    22             (DESIGN AND CONTINGENCIES - $51,000)
    23         (16)  S.R.4032 OVER SUMMIT LAKE CREEK PI
    24             NO.043591219, SOUTH ABINGTON TOWNSHIP,
    25             BRIDGE REPLACEMENT                            425,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $370,000)
    28             (LAND ALLOCATION - $10,000)
    29             (DESIGN AND CONTINGENCIES - $45,000)
    30         (17)  S.R.4032 OVER LEGGETTS CREEK PI
    19910H1959B3288                 - 96 -

     1             NO.043591220, SOUTH ABINGTON TOWNSHIP,
     2             BRIDGE REPLACEMENT                            615,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $540,000)
     5             (LAND ALLOCATION - $10,000)
     6             (DESIGN AND CONTINGENCIES - $65,000)
     7         (18)  S.R.0006 OVER S.R.0347 PI
     8             NO.043591223, BLAKELY BOROUGH, BRIDGE
     9             REPLACEMENT                                 1,564,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $1,384,000)
    12             (LAND ALLOCATION - $20,000)
    13             (DESIGN AND CONTINGENCIES - $160,000)
    14         (19)  S.R.0006 OVER S.R.0107 PI
    15             NO.043591223, MAYFIELD BOROUGH, BRIDGE
    16             REPLACEMENT                                 2,054,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $1,825,000)
    19             (LAND ALLOCATION - $10,000)
    20             (DESIGN AND CONTINGENCIES - $219,000)
    21         (20)  S.R.0690 OVER VAN BRUNT CREEK PI
    22             NO.043591208, MOSCOW BOROUGH, BRIDGE
    23             REPLACEMENT                                   480,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $420,000)
    26             (LAND ALLOCATION - $10,000)
    27             (DESIGN AND CONTINGENCIES - $50,000)
    28         (21)  S.R.0006 OVER BRANCH OF LEGGETTS
    29             CREEK PI NO.043591206, CLARKS SUMMIT
    30             BOROUGH, BRIDGE REPLACEMENT                   980,000
    19910H1959B3288                 - 97 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $866,000)
     3             (LAND ALLOCATION - $10,000)
     4             (DESIGN AND CONTINGENCIES - $104,000)
     5         (22)  S.R.3013 OVER LACKAWANNA RIVER PI
     6             NO.043583205, OLD FORGE BOROUGH, BRIDGE
     7             REPLACEMENT                                 2,175,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $1,932,000)
    10             (LAND ALLOCATION - $10,000)
    11             (DESIGN AND CONTINGENCIES - $233,000)
    12         (23)  S.R.0247 OVER LACKAWANNA RIVER PI
    13             NO.043591203, JESSUP BOROUGH, BRIDGE
    14             REPLACEMENT                                   740,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $650,000)
    17             (LAND ALLOCATION - $10,000)
    18             (DESIGN AND CONTINGENCIES - $80,000)
    19         (24)  S.R.3017 OVER LACKAWANNA RIVER PI
    20             NO.043591216, OLD FORGE BOROUGH, BRIDGE
    21             REPLACEMENT                                 2,193,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $1,949,000)
    24             (LAND ALLOCATION - $10,000)
    25             (DESIGN AND CONTINGENCIES - $234,000)
    26         (25)  S.R.3019 OVER BRANCH OF LACKAWANNA
    27             RIVER PI NO.043591217, OLD FORGE
    28             BOROUGH, BRIDGE REPLACEMENT                   537,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $470,000)
    19910H1959B3288                 - 98 -

     1             (LAND ALLOCATION - $10,000)
     2             (DESIGN AND CONTINGENCIES - $57,000)
     3         (26)  S.R.3027 OVER LEGGETTS CREEK PI
     4             NO.043589263, CITY OF SCRANTON, BRIDGE
     5             REPLACEMENT                                   906,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $800,000)
     8             (LAND ALLOCATION - $10,000)
     9             (DESIGN AND CONTINGENCIES - $96,000)
    10         (27)  S.R.1033 OVER FALL BROOK PI
    11             NO.043591211, CITY OF CARBONDALE,
    12             BRIDGE REPLACEMENT                            702,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $618,000)
    15             (LAND ALLOCATION - $10,000)
    16             (DESIGN AND CONTINGENCIES - $74,000)
    17         (28)  S.R.0006 OVER SOUTH BRANCH OF
    18             TUNKHANNOCK CREEK PI NO.043591205,
    19             LAPLUME TOWNSHIP, BRIDGE REPLACEMENT        1,596,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $1,416,000)
    22             (LAND ALLOCATION - $10,000)
    23             (DESIGN AND CONTINGENCIES - $170,000)
    24  SECTION 40.  LANCASTER COUNTY.
    25     (A)  LOCAL BRIDGES
    26         (1)  BART TOWNSHIP, T-389, DRYWELLS ROAD
    27             OVER MEETINGHOUSE CREEK, BRIDGE
    28             REPLACEMENT                                   420,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $350,000)
    19910H1959B3288                 - 99 -

     1             (LAND ALLOCATION - $10,000)
     2             (DESIGN AND CONTINGENCIES - $60,000)
     3         (2)  EARL TOWNSHIP, T-810, WHITE OAK ROAD
     4             OVER BIG CONESTOGA CREEK, BMS
     5             36720908100304, BRIDGE REPLACEMENT            585,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $500,000)
     8             (LAND ALLOCATION - $10,000)
     9             (DESIGN AND CONTINGENCIES - $75,000)
    10         (3)  EAST EARL TOWNSHIP, T-894, QUARRY ROAD
    11             OVER CONESTOGA RIVER, BRIDGE
    12             REPLACEMENT                                   470,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $400,000)
    15             (LAND ALLOCATION - $10,000)
    16             (DESIGN AND CONTINGENCIES - $60,000)
    17         (4)  EPHRATA TOWNSHIP, T-648, ROYER ROAD
    18             OVER COCALICO CREEK, BRIDGE
    19             REPLACEMENT                                   370,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $300,000)
    22             (LAND ALLOCATION - $10,000)
    23             (DESIGN AND CONTINGENCIES - $60,000)
    24         (5)  RAPHO TOWNSHIP, T-364, EBY CHICKIES
    25             ROAD OVER BIG CHICKIES CREEK, BRIDGE
    26             REPLACEMENT                                   645,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $550,000)
    29             (LAND ALLOCATION - $10,000)
    30             (DESIGN AND CONTINGENCIES - $85,000)
    19910H1959B3288                 - 100 -

     1         (6)  RAPHO TOWNSHIP, T-875, AUCTION ROAD
     2             OVER BIG CHICKIES CREEK, BRIDGE
     3             REPLACEMENT                                   395,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $325,000)
     6             (LAND ALLOCATION - $10,000)
     7             (DESIGN AND CONTINGENCIES - $60,000)
     8         (7)  SALISBURY TOWNSHIP, T-487, BUENA VISTA
     9             ROAD OVER PEQUEA CREEK, BRIDGE
    10             REPLACEMENT                                   295,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $225,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $60,000)
    15         (8)  SALISBURY TOWNSHIP, T-904, MOUNT
    16             VERNON ROAD OVER PEQUEA CREEK, BRIDGE
    17             REPLACEMENT                                   270,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $200,000)
    20             (LAND ALLOCATION - $10,000)
    21             (DESIGN AND CONTINGENCIES - $60,000)
    22         (9)  PEQUEA TOWNSHIP, T-492, CLEARVIEW ROAD
    23             BRIDGE OVER GOODS RUN, BRIDGE
    24             REPLACEMENT                                    32,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $25,000)
    27             (DESIGN AND CONTINGENCIES - $7,000)
    28         (10)  PEQUEA TOWNSHIP, T-557, SHIPROCK ROAD
    29             BRIDGE OVER SMALL RUN, BRIDGE
    30             REPLACEMENT                                   105,000
    19910H1959B3288                 - 101 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $90,000)
     3             (DESIGN AND CONTINGENCIES - $15,000)
     4         (11)  PEQUEA TOWNSHIP, T-557, MILLWOOD ROAD
     5             BRIDGE OVER GOODS RUN AT INTERSECTION
     6             WITH RAWLINSVILLE ROAD, BRIDGE
     7             REPLACEMENT                                   102,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $90,000)
    10             (DESIGN AND CONTINGENCIES - $12,000)
    11         (12)  PEQUEA TOWNSHIP, T-557, INDIAN HILL
    12             ROAD BRIDGE OVER GOODS RUN, BRIDGE
    13             REPLACEMENT                                    90,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $80,000)
    16             (DESIGN AND CONTINGENCIES - $10,000)
    17         (13)  CONESTOGA TOWNSHIP, T-418, SPRING RUN
    18             ROAD BRIDGE OVER UNNAMED BRANCH OF
    19             TRIBUTARY NO.1 OF CONESTOGA CREEK,
    20             BRIDGE REPLACEMENT                            160,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $130,000)
    23             (LAND ALLOCATION - $10,000)
    24             (DESIGN AND CONTINGENCIES - $20,000)
    25         (14)  EAST DRUMORE TOWNSHIP, T-472, MAXWELL
    26             BRIDGE ROAD OVER TRIBUTARY TO CONOWINGO
    27             CREEK, BRIDGE REPLACEMENT                      70,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $60,000)
    30             (DESIGN AND CONTINGENCIES - $10,000)
    19910H1959B3288                 - 102 -

     1         (15)  BART TOWNSHIP, T-451, LAMPARTER ROAD
     2             BRIDGE OVER WEST BRANCH OF OCTORARA
     3             CREEK, BRIDGE REPLACEMENT                      80,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $69,000)
     6             (DESIGN AND CONTINGENCIES - $11,000)
     7         (16)  LITITZ BOROUGH, EAST LINCOLN AVENUE
     8             BRIDGE OVER SANTO DOMINGO CREEK, BRIDGE
     9             REPLACEMENT                                   506,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $440,000)
    12             (DESIGN AND CONTINGENCIES - $66,000)
    13         (17)  EAST HEMPFIELD TOWNSHIP, HOLLAND
    14             STREET BRIDGE OVER AMTRAK, BRIDGE
    15             REPLACEMENT                                   350,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $285,000)
    18             (DESIGN AND CONTINGENCIES - $65,000)
    19         (18)  EAST HEMPFIELD TOWNSHIP, CONSTRUCT
    20             NEW BRIDGE ON GOOD DRIVE OVER U.S.30,
    21             BRIDGE CONSTRUCTION                         2,400,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $1,900,000)
    24             (LAND ALLOCATION - $150,000)
    25             (DESIGN AND CONTINGENCIES - $350,000)
    26     (B)  STATE BRIDGES
    27         (1)  S.R.1061, WILLOW STREET OVER TRIBUTARY
    28             OF MUDDY CREEK, ADAMSTOWN BOROUGH,
    29             BRIDGE REPLACEMENT                            663,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19910H1959B3288                 - 103 -

     1             $450,000)
     2             (LAND ALLOCATION - $55,000)
     3             (DESIGN AND CONTINGENCIES - $168,000)
     4         (2)  S.R.4009, DILLERVILLE ROAD OVER
     5             AMTRAK, LANCASTER CITY, BRIDGE
     6             REPLACEMENT                                 2,080,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $1,800,000)
     9             (LAND ALLOCATION - $10,000)
    10             (DESIGN AND CONTINGENCIES - $270,000)
    11         (3)  S.R.0272, READING ROAD OVER INDIAN
    12             RUN, EPHRATA TOWNSHIP, BRIDGE
    13             REPLACEMENT                                 1,275,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $1,100,000)
    16             (LAND ALLOCATION - $25,000)
    17             (DESIGN AND CONTINGENCIES - $150,000)
    18         (4)  S.R.3016, FAIRVIEW ROAD OVER CONRAIL,
    19             PROVIDENCE TOWNSHIP, BRIDGE
    20             REPLACEMENT                                 1,605,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $1,388,000)
    23             (LAND ALLOCATION - $10,000)
    24             (DESIGN AND CONTINGENCIES - $207,000)
    25         (5)  S.R.3030, CONESTOGA BOULEVARD OVER
    26             TRIBUTARY OF CONESTOGA RIVER, CONESTOGA
    27             TOWNSHIP, BRIDGE REPLACEMENT                  150,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $100,000)
    30             (LAND ALLOCATION - $10,000)
    19910H1959B3288                 - 104 -

     1             (DESIGN AND CONTINGENCIES - $40,000)
     2         (6)  S.R.0222, RAILROAD BRIDGE OVER
     3             S.R.0222, PROVIDENCE TOWNSHIP, BRIDGE
     4             REMOVAL                                       300,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $260,000)
     7             (LAND ALLOCATION - $10,000)
     8             (DESIGN AND CONTINGENCIES - $30,000)
     9         (7)  S.R.1035, NORTH WATER STREET BRIDGE
    10             OVER LITITZ RUN, LITITZ BOROUGH, BRIDGE
    11             REPLACEMENT                                   253,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $220,000)
    14             (DESIGN AND CONTINGENCIES - $33,000)
    15         (8)  S.R.1035, NORTH WATER STREET BRIDGE
    16             OVER SANTO DOMINGO CREEK, LITITZ
    17             BOROUGH, BRIDGE REPLACEMENT                   253,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $220,000)
    20             (DESIGN AND CONTINGENCIES - $33,000)
    21  SECTION 41.  LAWRENCE COUNTY.
    22     (A)  LOCAL BRIDGES
    23         (1)  SLIPPERY ROCK TOWNSHIP, T-741, (OLD
    24             ROUTE 422) ROSE POINT BRIDGE NO.1 OVER
    25             SLIPPERY ROCK CREEK, BRIDGE
    26             REPLACEMENT                                   870,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $800,000)
    29             (LAND ALLOCATION - $50,000)
    30             (DESIGN AND CONTINGENCIES - $20,000)
    19910H1959B3288                 - 105 -

     1         (2)  PLAIN GROVE TOWNSHIP, T-585, CRESS
     2             FARM ROAD OVER TRIBUTARY TO TAYLOR RUN,
     3             BRIDGE REPLACEMENT                            120,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $106,000)
     6             (DESIGN AND CONTINGENCIES - $14,000)
     7         (3)  PLAIN GROVE TOWNSHIP, T-543, RODGERS
     8             ROAD OVER JAMESON RUN, BRIDGE
     9             REPLACEMENT                                   184,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $170,000)
    12             (DESIGN AND CONTINGENCIES - $14,000)
    13         (4)  PLAIN GROVE TOWNSHIP, BLACK ROAD OVER
    14             TAYLOR RUN, BRIDGE REPLACEMENT                 92,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $83,000)
    17             (DESIGN AND CONTINGENCIES - $9,000)
    18         (5)  BRIDGE NO.72080537010 OVER JAMESON
    19             RUN, BRIDGE REPLACEMENT                       139,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $126,000)
    22             (DESIGN AND CONTINGENCIES - $13,000)
    23         (6)  SCOTT TOWNSHIP, BRIDGE
    24             NO.37721004977016, BRIDGE REPLACEMENT       1,141,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $1,027,000)
    27             (DESIGN AND CONTINGENCIES - $114,000)
    28         (7)  BRIDGE NO.37720805851003 EAST OF T-498
    29             INTERSECTION, BRIDGE REPLACEMENT              129,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19910H1959B3288                 - 106 -

     1             $116,000)
     2             (DESIGN AND CONTINGENCIES - $13,000)
     3         (8)  SLIPPERY ROCK TOWNSHIP, MCCONNELS MILL
     4             ROAD OVER SLIPPERY ROCK CREEK, BRIDGE
     5             REPLACEMENT                                    78,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $70,000)
     8             (DESIGN AND CONTINGENCIES - $8,000)
     9         (9)  SCOTT TOWNSHIP, BRIDGE
    10             NO.37721004857017, BRIDGE REPLACEMENT         610,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $549,000)
    13             (DESIGN AND CONTINGENCIES - $61,000)
    14         (10)  SLIPPERY ROCK TOWNSHIP, KILDO ROAD
    15             BRIDGE OVER UNNAMED STREAM, BRIDGE
    16             REPLACEMENT                                   581,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $523,000)
    19             (DESIGN AND CONTINGENCIES - $58,000)
    20         (11)  BRIDGE NO.37720805431009 NEAR T-508,
    21             BRIDGE REPLACEMENT                            332,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $299,000)
    24             (DESIGN AND CONTINGENCIES - $33,000)
    25         (12)  PLAIN GROVE TOWNSHIP, REESE ROAD OVER
    26             TAYLOR RUN, BRIDGE REPLACEMENT
    27             (BASE CONSTRUCTION ALLOCATION - $)
    28             (LAND ALLOCATION - $)
    29             (DESIGN AND CONTINGENCIES - $)
    30     (B)  STATE BRIDGES
    19910H1959B3288                 - 107 -

     1         (1)  S.R.1012, FREUE MILL ROAD OVER BIG
     2             RUN, SLIPPERY ROCK TOWNSHIP, BRIDGE
     3             REPLACEMENT                                 1,210,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $1,150,000)
     6             (LAND ALLOCATION - $50,000)
     7             (DESIGN AND CONTINGENCIES - $10,000)
     8         (2)  S.R.1014, PINE CORNERS ROAD OVER I-79,
     9             PLAIN GROVE TOWNSHIP, BRIDGE
    10             REPLACEMENT                                   400,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $250,000)
    13             (LAND ALLOCATION - $50,000)
    14             (DESIGN AND CONTINGENCIES - $100,000)
    15         (3)  S.R.2028, HILLS HOLLOW ROAD BRIDGE
    16             OVER HILL RUN, SLIPPERY ROCK TOWNSHIP,
    17             BRIDGE REPLACEMENT                            450,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $300,000)
    20             (LAND ALLOCATION - $50,000)
    21             (DESIGN AND CONTINGENCIES - $100,000)
    22         (4)  S.R.2030, MOUNTVILLE ROAD BRIDGE OVER
    23             SLIPPERY ROCK CREEK, SLIPPERY ROCK &
    24             PERRY TOWNSHIPS, BRIDGE REPLACEMENT           400,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $250,000)
    27             (LAND ALLOCATION - $50,000)
    28             (DESIGN AND CONTINGENCIES - $100,000)
    29         (5)  S.R.0065, L.R.79, EAST WASHINGTON
    30             STREET BRIDGE OVER NOSHANNOCK CREEK,
    19910H1959B3288                 - 108 -

     1             NEW CASTLE CITY, BRIDGE REPLACEMENT         1,650,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $1,525,000)
     4             (DESIGN AND CONTINGENCIES - $125,000)
     5         (6)  S.R.0168, CSX & P&LE UNDERPASS, TAYLOR
     6             TOWNSHIP, BRIDGE REPLACEMENT                1,100,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $1,000,000)
     9             (DESIGN AND CONTINGENCIES - $100,000)
    10         (7)  S.R.1016, LIBERTY ROAD BRIDGE OVER
    11             TAYLOR RUN, PLAIN GROVE TOWNSHIP,
    12             BRIDGE REPLACEMENT                            350,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $200,000)
    15             (LAND ALLOCATION - $50,000)
    16             (DESIGN AND CONTINGENCIES - $100,000)
    17  SECTION 42.  LEBANON COUNTY.
    18     (A)  LOCAL BRIDGES
    19         (1)  NORTH CORNWALL TOWNSHIP T-414, DAIRY
    20             ROAD OVER QUITTAPAHILLA CREEK, BRIDGE
    21             REPLACEMENT                                   321,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $251,000)
    24             (LAND ALLOCATION - $10,000)
    25             (DESIGN AND CONTINGENCIES - $60,000)
    26         (2)  UNION TOWNSHIP, T-615, RIDGE ROAD OVER
    27             TROUT RUN, BRIDGE REPLACEMENT                 205,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $135,000)
    30             (LAND ALLOCATION - $10,000)
    19910H1959B3288                 - 109 -

     1             (DESIGN AND CONTINGENCIES - $60,000)
     2     (B)  STATE BRIDGES (RESERVED)
     3  SECTION 43.  LEHIGH COUNTY.
     4     (A)  LOCAL BRIDGES
     5         (1)   WASHINGTON TOWNSHIP, T-787, WEST GANT
     6             STREET OVER TROUT CREEK, BRIDGE
     7             REPLACEMENT                                   175,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $135,000)
    10             (LAND ALLOCATION - $10,000)
    11             (DESIGN AND CONTINGENCIES - $30,000)
    12         (2)  LOWHILL TOWNSHIP, T-649, NARRIS ROAD
    13             BRIDGE NO.1 OVER SWITZER CREEK, BRIDGE
    14             REPLACEMENT                                   145,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $110,000)
    17             (LAND ALLOCATION - $10,000)
    18             (DESIGN AND CONTINGENCIES - $25,000)
    19         (3)  WHITEHALL TOWNSHIP, PEACH BOTTOM ROAD
    20             OVER SPRING CREEK, BRIDGE REPLACEMENT         190,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $135,000)
    23             (LAND ALLOCATION - $25,000)
    24             (DESIGN AND CONTINGENCIES - $30,000)
    25         (4)  WHITEHALL TOWNSHIP, EGGERT ROAD OVER
    26             SPRING CREEK, BRIDGE REPLACEMENT              235,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $180,000)
    29             (LAND ALLOCATION - $25,000)
    30             (DESIGN AND CONTINGENCIES - $30,000)
    19910H1959B3288                 - 110 -

     1         (5)  WHITEHALL TOWNSHIP, OVERLOOK LANE OVER
     2             SPRING CREEK, BRIDGE REPLACEMENT              215,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $160,000)
     5             (LAND ALLOCATION - $25,000)
     6             (DESIGN AND CONTINGENCIES - $30,000)
     7         (6)  WHITEHALL TOWNSHIP, COLUMBIA STREET
     8             OVER COPLAY CREEK, BRIDGE REPLACEMENT         385,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $250,000)
    11             (LAND ALLOCATION - $100,000)
    12             (DESIGN AND CONTINGENCIES - $35,000)
    13         (7)  LOWHILL TOWNSHIP, T-649,  NARRIS ROAD
    14             BRIDGE NO.2 OVER SWITZER CREEK, BRIDGE
    15             REPLACEMENT                                   170,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $130,000)
    18             (LAND ALLOCATION - $10,000)
    19             (DESIGN AND CONTINGENCIES - $30,000)
    20         (8)  MACUNGIE BOROUGH, HICKORY LANE OVER
    21             TRIBUTARY TO SWABIA CREEK, BRIDGE
    22             REPLACEMENT                                   160,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $110,000)
    25             (LAND ALLOCATION - $25,000)
    26             (DESIGN AND CONTINGENCIES - $25,000)
    27         (9)  CITY OF ALLENTOWN, UNION BOULEVARD
    28             OVER LEHIGH RIVER, BRIDGE REPLACEMENT       5,520,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $5,000,000)
    19910H1959B3288                 - 111 -

     1             (LAND ALLOCATION - $20,000)
     2             (DESIGN AND CONTINGENCIES - $500,000)
     3         (10)  CITY OF ALLENTOWN, READING ROAD OVER
     4             CEDAR CREEK, BRIDGE REPLACEMENT             1,010,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $865,000)
     7             (LAND ALLOCATION - $20,000)
     8             (DESIGN AND CONTINGENCIES - $125,000)
     9         (11)  CITY OF ALLENTOWN, WARD STREET (15TH
    10             STREET) OVER LITTLE LEHIGH CREEK,
    11             BRIDGE REPLACEMENT                          3,800,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $3,400,000)
    14             (LAND ALLOCATION - $20,000)
    15             (DESIGN AND CONTINGENCIES - $380,000)
    16         (12)  CITY OF ALLENTOWN, 15TH STREET BRIDGE
    17             OVER CONRAIL AND LITTLE LEHIGH CREEK,
    18             BRIDGE REHABILITATION                         750,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $500,000)
    21             (LAND ALLOCATION - $100,000
    22             (DESIGN AND CONTINGENCIES - $150,000)
    23         (13)  NORTH WHITEHALL TOWNSHIP, T-687,
    24             LEHIGH STREET BRIDGE, BRIDGE
    25             REPLACEMENT                                   150,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $135,000)
    28             (DESIGN AND CONTINGENCIES - $15,000)
    29         (14)  NORTH WHITEHALL TOWNSHIP, T-695,
    30             WALNUT STREET BRIDGE NO.1, BRIDGE
    19910H1959B3288                 - 112 -

     1             REHABILITATION                                 83,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $65,000)
     4             (DESIGN AND CONTINGENCIES - $18,000)
     5         (15)  NORTH WHITEHALL TOWNSHIP, T-695,
     6             WALNUT STREET BRIDGE NO.2, BRIDGE
     7             REHABILITATION                                105,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $85,000)
    10             (DESIGN AND CONTINGENCIES - $20,000)
    11         (16)  NORTH WHITEHALL TOWNSHIP, T-712
    12             BRIDGE AT OVERLOOK ROAD AND NEFFS-
    13             LAURYS ROAD, BRIDGE REPLACEMENT               141,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $120,000)
    16             (DESIGN AND CONTINGENCIES - $21,000)
    17         (17)  NORTH WHITEHALL TOWNSHIP, T-702,
    18             BRIDGE AT RIVERVIEW ROAD AND NEFFS-
    19             LAURYS ROAD, BRIDGE REPLACEMENT               118,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $100,000)
    22             (DESIGN AND CONTINGENCIES - $18,000)
    23     (B)  STATE BRIDGES
    24         (1)  S.R.0145 OVER ABANDONED CONRAIL LINE,
    25             WHITEHALL TOWNSHIP, BRIDGE REPLACEMENT        240,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $200,000)
    28             (LAND ALLOCATION - $20,000)
    29             (DESIGN AND CONTINGENCIES - $20,000)
    30         (2)  S.R.3001 OVER IRON RUN, LOWER MACUNGIE
    19910H1959B3288                 - 113 -

     1             TOWNSHIP, BRIDGE REPLACEMENT                  624,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $480,000)
     4             (LAND ALLOCATION - $96,000)
     5             (DESIGN AND CONTINGENCIES - $48,000)
     6         (3)  I-78 OVER IRON RUN, WEISENBERG
     7             TOWNSHIP, BRIDGE REPLACEMENT                  120,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $100,000)
    10             (DESIGN AND CONTINGENCIES - $20,000)
    11         (4)  S.R.0378 UNDER EASTON AVENUE, CITY OF
    12             BETHLEHEM, BRIDGE REPLACEMENT                 812,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $738,000)
    15             (DESIGN AND CONTINGENCIES - $74,000)
    16         (5)  S.R.0145 OVER TRIBUTARY TO COPLAY
    17             CREEK, WHITEHALL TOWNSHIP, BRIDGE
    18             REPLACEMENT                                   225,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $187,000)
    21             (LAND ALLOCATION - $19,000)
    22             (DESIGN AND CONTINGENCIES - $19,000)
    23         (6)  S.R.0378 UNDER CATASAQUA ROAD, CITY OF
    24             BETHLEHEM, BRIDGE REPLACEMENT                 742,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $674,000)
    27             (DESIGN AND CONTINGENCIES - $68,000)
    28         (7)  S.R.1015 OVER S.R.0022, WHITEHALL
    29             TOWNSHIP, BRIDGE REPLACEMENT                  569,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19910H1959B3288                 - 114 -

     1             $517,000)
     2             (DESIGN AND CONTINGENCIES - $52,000)
     3         (8)  S.R.2032 OVER SPRING CREEK, UPPER
     4             SAUCON TOWNSHIP, BRIDGE REPLACEMENT           140,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $100,000)
     7             (LAND ALLOCATION - $20,000)
     8             (DESIGN AND CONTINGENCIES - $20,000)
     9         (9)  S.R.0145 OVER JORDAN CREEK, CITY OF
    10             ALLENTOWN, BRIDGE REPLACEMENT               2,660,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $2,000,000)
    13             (LAND ALLOCATION - $460,000)
    14             (DESIGN AND CONTINGENCIES - $200,000)
    15         (10)  S.R.2055 ALBURTIS MEYERS BRIDGE OVER
    16             HARRISON ST., LAWRENCE ST., LITTLE
    17             LEHIGH CREEK AND RAILROAD, CITY OF
    18             ALLENTOWN, BRIDGE REPLACEMENT               2,200,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $2,000,000)
    21             (DESIGN AND CONTINGENCIES - $200,000)
    22         (11)  S.R.2030, CENTENNIAL BRIDGE OVER
    23             SAUCON CREEK, UPPER SAUCON
    24             TOWNSHIP, BRIDGE REPLACEMENT                  386,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $337,000)
    27             (LAND ALLOCATION - $16,000)
    28             (DESIGN AND CONTINGENCIES - $33,000)
    29         (12)  TILGHMAN STREET BRIDGE OVER LEHIGH
    30             RIVER, CITY OF ALLENTOWN, BRIDGE
    19910H1959B3288                 - 115 -

     1             REHABILITATION                              4,100,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $3,550,000)
     4             (LAND ALLOCATION - $100,000)
     5             (DESIGN AND CONTINGENCIES - $450,000)
     6  SECTION 44. LUZERNE COUNTY.
     7     (A)  LOCAL BRIDGES
     8         (1)  NESCOPECK TOWNSHIP, T-376 BRIDGE OVER
     9             NESCOPECK CREEK, BRIDGE REPLACEMENT           418,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $324,000)
    12             (LAND ALLOCATION - $10,000)
    13             (DESIGN AND CONTINGENCIES - $84,000)
    14         (2)  LEHMAN TOWNSHIP, T-581 BRIDGE OVER
    15             INLET PIKES CREEK RESERVOIR, BRIDGE
    16             REPLACEMENT                                   260,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $194,000)
    19             (LAND ALLOCATION - $15,000)
    20             (DESIGN AND CONTINGENCIES - $51,000)
    21         (3)  ROSS TOWNSHIP, COUNTY ROAD BRIDGE NO.1
    22             OVER HUNLOCK CREEK, BRIDGE REPLACEMENT        269,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $194,000)
    25             (LAND ALLOCATION - $15,000
    26             (DESIGN AND CONTINGENCIES - $60,000
    27         (4)  KINGSTON TOWNSHIP, COUNTY ROAD BRIDGE
    28             NO.16 OVER TOBY'S CREEK, BRIDGE
    29             REPLACEMENT                                   379,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19910H1959B3288                 - 116 -

     1             $301,000)
     2             (DESIGN AND CONTINGENCIES - $78,000)
     3         (5)  BLACK CREEK TOWNSHIP, T-309 BRIDGE
     4             OVER FALLS RUN, BRIDGE REPLACEMENT            280,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $210,000)
     7             (LAND ALLOCATION - $ 15,000
     8             (DESIGN AND CONTINGENCIES - $55,000)
     9         (6)  JACKSON TOWNSHIP, T-704 BRIDGE OVER
    10             BRANCH OF HARVEYS CREEK, BRIDGE
    11             REPLACEMENT                                   260,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $194,000)
    14             (LAND ALLOCATION - $15,000
    15             (DESIGN AND CONTINGENCIES - $51,000)
    16         (7)  UNION TOWNSHIP, T-451 BRIDGE OVER
    17             SHICKSHINNY CREEK, BRIDGE REPLACEMENT         269,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $194,000)
    20             (LAND ALLOCATION - $15,000
    21             (DESIGN AND CONTINGENCIES - $ 60,000)
    22         (8)  SUGARLOAF TOWNSHIP, COUNTY ROAD BRIDGE
    23             NO.37 OVER LITTLE NESCOPECK CREEK,
    24             BRIDGE REPLACEMENT                            368,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $292,000)
    27             (DESIGN AND CONTINGENCIES - $76,000)
    28         (9)  SUGARLOAF TOWNSHIP, T-332 BRIDGE OVER
    29             NESCOPECK CREEK, BRIDGE REPLACEMENT           422,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19910H1959B3288                 - 117 -

     1             $335,000)
     2             (DESIGN AND CONTINGENCIES - $87,000)
     3         (10)  HANOVER TOWNSHIP, OXFORD STREET OVER
     4             SOLOMON'S CREEK, BRIDGE REPLACEMENT           368,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $292,000)
     7             (DESIGN AND CONTINGENCIES - $76,000)
     8         (11)  FAIRMOUNT TOWNSHIP, T-620 BRIDGE OVER
     9             PHILLIPS CREEK, BRIDGE REPLACEMENT            277,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $212,000)
    12             (DESIGN AND CONTINGENCIES - $65,000)
    13         (12)  HANOVER TOWNSHIP, EAST DIVISION
    14             STREET OVER SOLOMON'S CREEK, BRIDGE
    15             REPLACEMENT                                   251,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $199,000)
    18             (DESIGN AND CONTINGENCIES - $52,000)
    19         (13)  DORRANCE TOWNSHIP, T-404 BRIDGE OVER
    20             LITTLE WAPWALLOPEN CREEK, BRIDGE
    21             REPLACEMENT                                   260,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $194,000)
    24             (LAND ALLOCATION - $ 15,000)
    25             (DESIGN AND CONTINGENCIES - $51,000)
    26         (14)  BUTLER TOWNSHIP, COUNTY ROAD BRIDGE
    27             NO.41 OVER NESCOPECK CREEK, BRIDGE
    28             REPLACEMENT                                   260,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $194,000)
    19910H1959B3288                 - 118 -

     1             (LAND ALLOCATION - $15,000)
     2             (DESIGN AND CONTINGENCIES - $51,000)
     3         (15)  DORRANCE TOWNSHIP, T-387 BRIDGE OVER
     4             WAPWALLOPEN CREEK, BRIDGE REPLACEMENT         341,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $259,000)
     7             (LAND ALLOCATION - $15,000)
     8             (DESIGN AND CONTINGENCIES - $67,000)
     9         (16)  DORRANCE TOWNSHIP, COUNTY ROAD BRIDGE
    10             NO.29 OVER WAPWALLOPEN CREEK, BRIDGE
    11             REPLACEMENT                                   225,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $160,000)
    14             (DESIGN AND CONTINGENCIES - $65,000)
    15         (17)  LEHMAN TOWNSHIP, T-322 BRIDGE NO.14
    16             MASKENOZHA BRIDGE OVER LAKE MASKENOZHA
    17             OUTLET, BRIDGE REPLACEMENT                    210,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $165,000)
    20             (LAND ALLOCATION - $20,000)
    21             (DESIGN AND CONTINGENCIES - $25,000)
    22         (18)  NESCOPECK TOWNSHIP, T-453 OVER
    23             TRIBUTARY TO NESCOPECK CREEK
    24             NO.044090201, BRIDGE REPLACEMENT              350,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $300,000)
    27             (LAND ALLOCATION - $10,000)
    28             (DESIGN AND CONTINGENCIES - $40,000)
    29         (19)  DURYEA BOROUGH, STEPHENSON STREET
    30             OVER LACKAWANNA RIVER, BRIDGE
    19910H1959B3288                 - 119 -

     1             REPLACEMENT                                   330,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $300,000)
     4             (DESIGN AND CONTINGENCIES - $30,000)
     5         (20)  DUPONT BOROUGH, BRIDGE ON ELM STREET
     6             OVER MILL CREEK, BRIDGE REPLACEMENT           240,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $220,000)
     9             (DESIGN AND CONTINGENCIES - $20,000)
    10         (21)  CITY OF WILKES-BARRE, GOVIER STREET
    11             OVER LAUREL RUN CREEK, BRIDGE
    12             REPLACEMENT                                    31,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $25,000)
    15             (DESIGN AND CONTINGENCIES - $6,000)
    16         (22)  CITY OF WILKES-BARRE, SIDNEY STREET
    17             OVER MILL CREEK, BRIDGE REPLACEMENT            59,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $50,000)
    20             (DESIGN AND CONTINGENCIES - $9,000)
    21         (23)  CITY OF WILKES-BARRE, REGENT STREET
    22             OVER SOLOMON'S CREEK, BRIDGE
    23             REPLACEMENT                                    26,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $20,000)
    26             (DESIGN AND CONTINGENCIES - $6,000)
    27         (24)  CITY OF WILKES-BARRE, STRAUSS STREET
    28             OVER SOLOMON'S CREEK, BRIDGE
    29             REPLACEMENT                                    16,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19910H1959B3288                 - 120 -

     1             $12,000)
     2             (DESIGN AND CONTINGENCIES - $4,000)
     3         (25)  CITY OF WILKES-BARRE, BARNEY STREET
     4             OVER SOLOMON'S CREEK, BRIDGE
     5             REPLACEMENT                                    15,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $11,000)
     8             (DESIGN AND CONTINGENCIES - $4,000)
     9         (26)  CITY OF WILKES-BARRE, FRANKLIN STREET
    10             OVER SOLOMON'S CREEK, BRIDGE
    11             REPLACEMENT                                    59,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $50,000)
    14             (DESIGN AND CONTINGENCIES - $9,000)
    15         (27)  CITY OF WILKES-BARRE, WALKER STREET
    16             OVER SOLOMON'S CREEK, BRIDGE
    17             REPLACEMENT                                   175,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $150,000)
    20             (DESIGN AND CONTINGENCIES - $25,000)
    21         (28)  CITY OF WILKES-BARRE, MILL STREET
    22             OVER LAUREL RUN CREEK, BRIDGE
    23             REPLACEMENT                                   175,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $150,000)
    26             (DESIGN AND CONTINGENCIES - $25,000)
    27         (29)  CITY OF WILKES-BARRE, SCOTT STREET
    28             OVER COAL BROOK, BRIDGE REPLACEMENT           120,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $100,000)
    19910H1959B3288                 - 121 -

     1             (DESIGN AND CONTINGENCIES - $20,000)
     2         (30)  CITY OF WILKES-BARRE, WALLER STREET
     3             OVER SOLOMON'S CREEK NO.044091245,
     4             BRIDGE REPLACEMENT                            175,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $150,000)
     7             (DESIGN AND CONTINGENCIES - $25,000)
     8         (31)  BUTLER TOWNSHIP, COUNTY ROAD BRIDGE
     9             NO.1 OVER NESCOPECK CREEK, BRIDGE
    10             REPLACEMENT                                   280,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $210,000)
    13             (LAND ALLOCATION - $15,000)
    14             (DESIGN AND CONTINGENCIES - $55,000)
    15     (B)  STATE BRIDGES
    16         (1)  S.R.2035 BRIDGE OVER LITTLE MILL
    17             CREEK, PITTSTON TOWNSHIP, BRIDGE
    18             REPLACEMENT                                   648,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $570,000)
    21             (LAND ALLOCATION - $10,000)
    22             (DESIGN AND CONTINGENCIES - $68,000)
    23         (2)  S.R.2035 BRIDGE OVER MEADOW RUN, BEAR
    24             CREEK TOWNSHIP, BRIDGE REPLACEMENT            480,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $420,000)
    27             (LAND ALLOCATION - $10,000)
    28             (DESIGN AND CONTINGENCIES - $50,000)
    29         (3)  S.R.2020 BRIDGE OVER BRANCH OF MILL
    30             CREEK, PLAINS TOWNSHIP, BRIDGE
    19910H1959B3288                 - 122 -

     1             REPLACEMENT                                   382,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $332,000)
     4             (LAND ALLOCATION - $10,000)
     5             (DESIGN AND CONTINGENCIES - $40,000)
     6         (4)  S.R.2004 BRIDGE OVER RAILROAD, PLAINS
     7             TOWNSHIP, BRIDGE REPLACEMENT                1,350,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $1,197,000)
    10             (LAND ALLOCATION - $10,000)
    11             (DESIGN AND CONTINGENCIES - $143,000)
    12         (5)  S.R.4016 BRIDGE OVER HUNLOCK CREEK
    13             NO.044091233, HUNLOCK TOWNSHIP, BRIDGE
    14             REPLACEMENT                                 1,130,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $1,000,000)
    17             (LAND ALLOCATION - $10,000)
    18             (DESIGN AND CONTINGENCIES - $120,000)
    19         (6)  S.R.1021 BRIDGE OVER ABRAHAM'S CREEK
    20             NO.044091234, KINGSTON TOWNSHIP, BRIDGE
    21             REPLACEMENT                                   540,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $472,000)
    24             (LAND ALLOCATION - $10,000)
    25             (DESIGN AND CONTINGENCIES - $58,000)
    26         (7)  S.R.4008 BRIDGE OVER BRANCH OF
    27             HUNTINGTON CREEK NO.044091232,
    28             HUNTINGTON TOWNSHIP, BRIDGE
    29             REPLACEMENT                                   346,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19910H1959B3288                 - 123 -

     1             $300,000)
     2             (LAND ALLOCATION - $10,000)
     3             (DESIGN AND CONTINGENCIES - $36,000)
     4         (8)  S.R.4007 BRIDGE OVER SHICKSHINNY CREEK
     5             NO.044091231, UNION TOWNSHIP, BRIDGE
     6             REPLACEMENT                                   752,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $662,000)
     9             (LAND ALLOCATION - $10,000)
    10             (DESIGN AND CONTINGENCIES - $80,000)
    11         (9)  S.R.1032 BRIDGE OVER PIKES CREEK
    12             NO.0044091225, LAKE TOWNSHIP, BRIDGE
    13             REPLACEMENT                                   486,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $425,000)
    16             (LAND ALLOCATION - $10,000)
    17             (DESIGN AND CONTINGENCIES - $51,000)
    18         (10)  S.R.0029 BRIDGE OVER ABANDONED
    19             RAILROAD, SUGAR NOTCH BOROUGH, BRIDGE
    20             REPLACEMENT                                 1,920,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $1,710,000)
    23             (LAND ALLOCATION - $10,000)
    24             (DESIGN AND CONTINGENCIES - $200,000)
    25         (11)  S.R.0309 BRIDGE OVER RAILROAD AND
    26             NANTICOKE CREEK, HANOVER TOWNSHIP,
    27             BRIDGE REPLACEMENT                          2,760,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $2,500,000)
    30             (LAND ALLOCATION - $10,000)
    19910H1959B3288                 - 124 -

     1             (DESIGN AND CONTINGENCIES - $250,000)
     2         (12)  S.R.0081 BRIDGE OVER CONRAIL
     3             RAILROAD, HAZLE TOWNSHIP, BRIDGE
     4             REPLACEMENT                                 1,540,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $1,370,000)
     7             (LAND ALLOCATION - $10,000)
     8             (DESIGN AND CONTINGENCIES - $160,000)
     9         (13)  S.R.0081 BRIDGE OVER CONRAIL
    10             RAILROAD, HAZLE TOWNSHIP, BRIDGE
    11             REPLACEMENT                                 1,540,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $1,370,000)
    14             (LAND ALLOCATION - $10,000)
    15             (DESIGN AND CONTINGENCIES - $160,000)
    16         (14)  S.R.1026 BRIDGE OVER LEONARDS CREEK,
    17             DALLAS TOWNSHIP, BRIDGE REPLACEMENT           570,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $500,000)
    20             (LAND ALLOCATION - $10,000)
    21             (DESIGN AND CONTINGENCIES - $60,000)
    22         (15)  S.R.0029 BRIDGE OVER HAUL ROAD,
    23             HANOVER TOWNSHIP, BRIDGE REPLACEMENT        2,925,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $2,615,000)
    26             (LAND ALLOCATION - $10,000)
    27             (DESIGN AND CONTINGENCIES - $300,000)
    28         (16)  S.R.1035 BRIDGE OVER CIDER RUN CREEK,
    29             FRANKLIN TOWNSHIP, BRIDGE REPLACEMENT         458,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19910H1959B3288                 - 125 -

     1             $400,000)
     2             (LAND ALLOCATION - $10,000)
     3             (DESIGN AND CONTINGENCIES - $48,000)
     4         (17)  S.R.3005 BRIDGE OVER BLACK BROOK,
     5             SLOCUM TOWNSHIP, BRIDGE REPLACEMENT           587,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $515,000)
     8             (LAND ALLOCATION - $10,000)
     9             (DESIGN AND CONTINGENCIES - $62,000)
    10         (18)  S.R.2045 BRIDGE OVER BRANCH OF
    11             WAPWALLOPEN CREEK, BRIDGE REPLACEMENT         738,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $650,000)
    14             (LAND ALLOCATION - $10,000)
    15             (DESIGN AND CONTINGENCIES - $78,000)
    16         (19)  S.R.3005 BRIDGE OVER BLACK BROOK,
    17             SLOCUM TOWNSHIP, BRIDGE REPLACEMENT           620,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $545,000)
    20             (LAND ALLOCATION - $10,000)
    21             (DESIGN AND CONTINGENCIES - $65,000)
    22         (20)  S.R.3011 BRIDGE OVER WAPWALLOPEN
    23             CREEK, HOLLENBACK TOWNSHIP, BRIDGE
    24             REPLACEMENT                                   738,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $650,000)
    27             (LAND ALLOCATION - $10,000)
    28             (DESIGN AND CONTINGENCIES - $78,000)
    29         (21)  S.R.0029 BRIDGE OVER T.R.11, PLYMOUTH
    30             TOWNSHIP, BRIDGE REPLACEMENT                  470,000
    19910H1959B3288                 - 126 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $410,000)
     3             (LAND ALLOCATION - $10,000)
     4             (DESIGN AND CONTINGENCIES - $50,000)
     5         (22)  S.R.3020 BRIDGE OVER BRANCH OF BLACK
     6             CREEK, BLACK CREEK TOWNSHIP, BRIDGE
     7             REPLACEMENT                                   540,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $472,000)
    10             (LAND ALLOCATION - $10,000)
    11             (DESIGN AND CONTINGENCIES - $58,000)
    12         (23)  S.R.2035 BRIDGE OVER LITTLE MILLE
    13             CREEK, PITTSTON TOWNSHIP, BRIDGE
    14             REPLACEMENT                                   648,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $570,000)
    17             (LAND ALLOCATION - $10,000)
    18             (DESIGN AND CONTINGENCIES - $68,000)
    19         (24)  S.R.0239 BRIDGE OVER SHICKSHINNY
    20             CREEK, UNION TOWNSHIP, BRIDGE
    21             REPLACEMENT                                   850,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $750,000)
    24             (LAND ALLOCATION - $10,000)
    25             (DESIGN AND CONTINGENCIES - $90,000)
    26         (25)  S.R.1036 BRIDGE OVER LEONARDS CREEK,
    27             KINGSTON TOWNSHIP, BRIDGE REPLACEMENT         775,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $684,000)
    30             (LAND ALLOCATION - $10,000)
    19910H1959B3288                 - 127 -

     1             (DESIGN AND CONTINGENCIES - $81,000)
     2         (26)  S.R.0404 BRIDGE OVER LITTLE
     3             SHICKSHINNY CREEK, SALEM TOWNSHIP,
     4             BRIDGE REPLACEMENT                            822,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $725,000)
     7             (LAND ALLOCATION - $10,000)
     8             (DESIGN AND CONTINGENCIES - $87,000)
     9         (27)  S.R.1036 BRIDGE OVER TOBY CREEK,
    10             KINGSTON TOWNSHIP, BRIDGE REPLACEMENT         640,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $563,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $67,000)
    15         (28)  S.R.1013 BRIDGE OVER TOBY CREEK,
    16             LUZERNE BOROUGH, BRIDGE REPLACEMENT         1,218,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $1,078,000)
    19             (LAND ALLOCATION - $10,000)
    20             (DESIGN AND CONTINGENCIES - $130,000)
    21         (29)  S.R.1032 BRIDGE OVER BRANCH OF BEAR
    22             HOLLOW CREEK, LAKE TOWNSHIP, BRIDGE
    23             REPLACEMENT                                   503,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $440,000)
    26             (LAND ALLOCATION - $10,000)
    27             (DESIGN AND CONTINGENCIES - $53,000)
    28         (30)  S.R.2008 BRIDGE OVER NANTICOKE CREEK,
    29             HANOVER TOWNSHIP, BRIDGE REPLACEMENT          628,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19910H1959B3288                 - 128 -

     1             $552,000)
     2             (LAND ALLOCATION - $10,000)
     3             (DESIGN AND CONTINGENCIES - $66,000)
     4         (31)  S.R.2005 BRIDGE OVER BOWMAN SPRING
     5             RUN, CITY OF WILKES-BARRE, BRIDGE
     6             REPLACEMENT                                   510,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $447,000)
     9             (LAND ALLOCATION - $10,000)
    10             (DESIGN AND CONTINGENCIES - $53,000)
    11         (32)  S.R.2015 BRIDGE OVER GARDNER CREEK,
    12             LAFLIN BOROUGH, BRIDGE REPLACEMENT            592,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $520,000)
    15             (LAND ALLOCATION - $10,000)
    16             (DESIGN AND CONTINGENCIES - $62,000)
    17         (33)  S.R.2017 BRIDGE OVER S.R.3031,
    18             JENKINS TOWNSHIP, BRIDGE REPLACEMENT        1,156,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $1,034,000)
    21             (LAND ALLOCATION - $10,000)
    22             (DESIGN AND CONTINGENCIES - $112,000)
    23         (34)  S.R.2020 BRIDGE OVER BRANCH OF MILL
    24             CREEK, PLAINS TOWNSHIP, BRIDGE
    25             REPLACEMENT                                   382,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $332,000)
    28             (LAND ALLOCATION - $10,000)
    29             (DESIGN AND CONTINGENCIES - $40,000)
    30         (35)  S.R.2020 BRIDGE OVER MILL CREEK,
    19910H1959B3288                 - 129 -

     1             PLAINS TOWNSHIP, BRIDGE REPLACEMENT           727,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $640,000)
     4             (LAND ALLOCATION - $10,000)
     5             (DESIGN AND CONTINGENCIES - $77,000)
     6         (36)  S.R.2026 BRIDGE OVER GARDNERS CREEK,
     7             LAFLIN BOROUGH, BRIDGE REPLACEMENT            772,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $680,000)
    10             (LAND ALLOCATION - $10,000)
    11             (DESIGN AND CONTINGENCIES - $82,000)
    12         (37)  S.R.0118 BRIDGE OVER BRANCH OF
    13             HARVEYS CREEK, LEHMAN TOWNSHIP, BRIDGE
    14             REPLACEMENT                                   604,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $530,000)
    17             (LAND ALLOCATION - $10,000)
    18             (DESIGN AND CONTINGENCIES - $64,000)
    19         (38)  S.R.1010 BRIDGE OVER ABRAHAMS CREEK,
    20             WEST WYOMING BOROUGH, BRIDGE
    21             REPLACEMENT                                 1,230,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $1,087,000)
    24             (LAND ALLOCATION - $10,000)
    25             (DESIGN AND CONTINGENCIES - $133,000)
    26         (39)  S.R.2002 BRIDGE OVER SOLOMON'S CREEK,
    27             HANOVER TOWNSHIP, BRIDGE REPLACEMENT        1,475,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $1,308,000)
    30             (LAND ALLOCATION - $10,000)
    19910H1959B3288                 - 130 -

     1             (DESIGN AND CONTINGENCIES - $157,000)
     2         (40)  S.R.2029 BRIDGE OVER MILL CREEK,
     3             AVOCA BOROUGH, BRIDGE REPLACEMENT             984,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $870,000)
     6             (LAND ALLOCATION - $10,000)
     7             (DESIGN AND CONTINGENCIES - $104,000)
     8         (41)  S.R.2035 BRIDGE OVER BRANCH OF MEADOW
     9             RUN, BEAR CREEK TOWNSHIP, BRIDGE
    10             REPLACEMENT                                   525,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $460,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $55,000)
    15         (42)  S.R.2035 BRIDGE OVER BEAR CREEK, BEAR
    16             CREEK TOWNSHIP, BRIDGE REPLACEMENT            452,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $395,000)
    19             (LAND ALLOCATION - $10,000)
    20             (DESIGN AND CONTINGENCIES - $37,000)
    21         (43)  S.R. 2020 BRIDGE OVER MILL CREEK,
    22             PLAINS TOWNSHIP, BRIDGE REPLACEMENT           727,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $640,000)
    25             (LAND ALLOCATION - $10,000)
    26             (DESIGN AND CONTINGENCIES - $77,000)
    27         (44)  S.R.2017 BRIDGE OVER S.R.2021,
    28             JENKINS TOWNSHIP, BRIDGE REPLACEMENT        1,156,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $1,034,000)
    19910H1959B3288                 - 131 -

     1             (LAND ALLOCATION - $10,000)
     2             (DESIGN AND CONTINGENCIES - $112,000)
     3         (45)  S.R.2021 CULVERT SEGMENT 0020, OFFSET
     4             2190, PITTSTON TOWNSHIP, BRIDGE
     5             REPLACEMENT                                   300,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $260,000)
     8             (LAND ALLOCATION - $10,000)
     9             (DESIGN AND CONTINGENCIES - $30,000)
    10         (46)  S.R.2024 CULVERT SEGMENT 0110, OFFSET
    11             0000 PI NO.044092201, JENKINS TOWNSHIP,
    12             BRIDGE REPLACEMENT                            200,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $170,000)
    15             (LAND ALLOCATION - $10,000)
    16             (DESIGN AND CONTINGENCIES - $20,000)
    17  SECTION 45.  LYCOMING COUNTY.
    18     (A)  LOCAL BRIDGES
    19         (1)  ARMSTRONG TOWNSHIP, T-329 OVER
    20             MOSQUITO CREEK, BRIDGE REPLACEMENT            427,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $342,000)
    23             (LAND ALLOCATION - $21,000)
    24             (DESIGN AND CONTINGENCIES - $64,000)
    25         (2)  ARMSTRONG TOWNSHIP, T-434 OVER
    26             MOSQUITO CREEK, BRIDGE REPLACEMENT            541,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $433,000)
    29             (LAND ALLOCATION - $27,000)
    30             (DESIGN AND CONTINGENCIES - $81,000)
    19910H1959B3288                 - 132 -

     1         (3)  BROWN TOWNSHIP, T-762 OVER JACOBS RUN,
     2             BRIDGE REPLACEMENT                            411,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $329,000)
     5             (LAND ALLOCATION - $21,000)
     6             (DESIGN AND CONTINGENCIES - $61,000)
     7         (4)  CASCADE TOWNSHIP, T-665 OVER POTASH
     8             HOLLOW CREEK, BRIDGE REPLACEMENT              214,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $171,000)
    11             (LAND ALLOCATION - $11,000)
    12             (DESIGN AND CONTINGENCIES - $32,000)
    13         (5)  FRANKLIN TOWNSHIP, T-710 OVER BEAVER
    14             RUN, BRIDGE REPLACEMENT                       265,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $212,000)
    17             (LAND ALLOCATION - $13,000)
    18             (DESIGN AND CONTINGENCIES - $40,000)
    19         (6)  HEPBURN TOWNSHIP, T-510 OVER MILL
    20             CREEK, BRIDGE REPLACEMENT                     303,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $257,000)
    23             (DESIGN AND CONTINGENCIES - $46,000)
    24         (7)  JORDAN TOWNSHIP, T-740 OVER MUNCY
    25             CREEK, NORTHEAST OF LAIRDSVILLE, BRIDGE
    26             REPLACEMENT                                   321,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $269,000)
    29             (LAND ALLOCATION - $29,000)
    30             (DESIGN AND CONTINGENCIES - $23,000)
    19910H1959B3288                 - 133 -

     1         (8)  LEWIS TOWNSHIP, T-856 OVER PLEASANT
     2             STREAM, BRIDGE REPLACEMENT                    424,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $302,000)
     5             (LAND ALLOCATION - $19,000)
     6             (DESIGN AND CONTINGENCIES - $103,000)
     7         (9)  LEWIS TOWNSHIP, T-629 OVER SLACKS RUN,
     8             BRIDGE REPLACEMENT                            356,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $285,000)
    11             (LAND ALLOCATION - $18,000)
    12             (DESIGN AND CONTINGENCIES - $53,000)
    13         (10)  LEWIS TOWNSHIP, T-836 OVER TROUT RUN,
    14             BRIDGE REPLACEMENT                            321,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $257,000)
    17             (LAND ALLOCATION - $16,000)
    18             (DESIGN AND CONTINGENCIES - $48,000)
    19         (11)  MORELAND TOWNSHIP, T-664 OVER GERMAN
    20             RUN, BRIDGE REPLACEMENT                       300,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $240,000)
    23             (LAND ALLOCATION - $15,000)
    24             (DESIGN AND CONTINGENCIES - $45,000)
    25         (12)  MORELAND TOWNSHIP, T-668, KRAMER HILL
    26             ROAD OVER SUGAR RUN, BRIDGE
    27             REPLACEMENT                                   245,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $196,000)
    30             (LAND ALLOCATION - $12,000)
    19910H1959B3288                 - 134 -

     1             (DESIGN AND CONTINGENCIES - $37,000)
     2         (13)  MORELAND TOWNSHIP, T-447 OVER LAUREL
     3             RUN NO.1, BRIDGE REPLACEMENT                  311,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $264,000)
     6             (LAND ALLOCATION - $15,000)
     7             (DESIGN AND CONTINGENCIES - $32,000)
     8         (14)  MORELAND TOWNSHIP, T-638 OVER LAUREL
     9             RUN, BRIDGE REPLACEMENT                       285,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $228,000)
    12             (LAND ALLOCATION - $14,000)
    13             (DESIGN AND CONTINGENCIES - $43,000)
    14         (15)  PENN TOWNSHIP, T-654 OVER GREGGS RUN,
    15             BRIDGE REPLACEMENT                            225,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $180,000)
    18             (LAND ALLOCATION - $11,000)
    19             (DESIGN AND CONTINGENCIES - $34,000)
    20         (16)  PENN/FRANKLIN TOWNSHIP, T-706 OVER
    21             BEAVER RUN, BRIDGE REPLACEMENT                272,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $217,000)
    24             (LAND ALLOCATION - $14,000)
    25             (DESIGN AND CONTINGENCIES - $41,000)
    26         (17)  PINE TOWNSHIP, T-776 OVER ENGLISH RUN
    27             NO.2, BRIDGE REPLACEMENT                      325,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $260,000)
    30             (LAND ALLOCATION - $16,000)
    19910H1959B3288                 - 135 -

     1             (DESIGN AND CONTINGENCIES - $49,000)
     2         (18)  PINE TOWNSHIP, T-782 OVER ROCK RUN,
     3             BRIDGE REPLACEMENT                            225,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $180,000)
     6             (LAND ALLOCATION - $11,000)
     7             (DESIGN AND CONTINGENCIES - $34,000)
     8         (19)  PINE TOWNSHIP, T-782 OVER TEXAS CREEK
     9             NO.1, BRIDGE REPLACEMENT                      484,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $387,000)
    12             (LAND ALLOCATION - $24,000)
    13             (DESIGN AND CONTINGENCIES - $73,000)
    14         (20)  SHREWSBURY TOWNSHIP, T-658 OVER BIG
    15             RUN, BRIDGE REPLACEMENT                       250,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $210,000)
    18             (LAND ALLOCATION - $10,000)
    19             (DESIGN AND CONTINGENCIES - $30,000)
    20         (21)  SHREWSBURY TOWNSHIP, T-686 OVER ROCK
    21             RUN NO.1, BRIDGE REPLACEMENT                  305,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $244,000)
    24             (LAND ALLOCATION - $15,000)
    25             (DESIGN AND CONTINGENCIES - $46,000)
    26         (22)  SHREWSBURY TOWNSHIP, T-686 OVER ROCK
    27             RUN NO.2, BRIDGE REPLACEMENT                  262,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $202,000)
    30             (LAND ALLOCATION - $13,000)
    19910H1959B3288                 - 136 -

     1             (DESIGN AND CONTINGENCIES - $47,000)
     2         (23)  WASHINGTON TOWNSHIP, T-397 OVER WHITE
     3             DEER HOLE CREEK, BRIDGE REPLACEMENT           204,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $170,000)
     6             (LAND ALLOCATION - $19,000)
     7             (DESIGN AND CONTINGENCIES - $15,000)
     8         (24)  WOLF TOWNSHIP, T-250 OVER GREGGS RUN,
     9             BRIDGE REPLACEMENT                            290,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $245,000)
    12             (LAND ALLOCATION - $10,000)
    13             (DESIGN AND CONTINGENCIES - $35,000)
    14         (25)  LOYALSOCK TOWNSHIP, MILLER STREET
    15             BETWEEN WILLIAMSPORT CITY LINE AND
    16             WARREN AVENUE, BRIDGE REPLACEMENT             250,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $200,000)
    19             (LAND ALLOCATION - $20,000)
    20             (DESIGN AND CONTINGENCIES - $30,000)
    21     (B)  STATE BRIDGES
    22         (1)  S.R.3018, T-842, FIRST FORKS ROAD
    23             BRIDGE OVER FIRST FORK LARRYS CREEK,
    24             MIFFLIN TOWNSHIP, BRIDGE REPLACEMENT          425,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $340,000)
    27             (LAND ALLOCATION - $64,000)
    28             (DESIGN AND CONTINGENCIES - $21,000)
    29  SECTION 46.  MCKEAN COUNTY.
    30     (A)  LOCAL BRIDGES (RESERVED)
    19910H1959B3288                 - 137 -

     1     (B)  STATE BRIDGES
     2         (1)  S.R.0046, HAVEN BROOK BRIDGE OVER
     3             HAVENS BROOK, NORWICH TOWNSHIP, BRIDGE
     4             REPLACEMENT                                   700,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $500,000)
     7             (LAND ALLOCATION - $100,000)
     8             (DESIGN AND CONTINGENCIES - $100,000)
     9         (2)  S.R.0770, SHEPPARD RUN BRIDGE OVER
    10             SHEPPARD RUN, BRADFORD TOWNSHIP, BRIDGE
    11             REPLACEMENT                                   725,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $525,000)
    14             (LAND ALLOCATION - $100,000)
    15             (DESIGN AND CONTINGENCIES - $100,000)
    16         (3)  S.R.0046 BRIDGE OVER HAVENS BROOK,
    17             NORWICH TOWNSHIP, BRIDGE REPLACEMENT          700,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $500,000)
    20             (LAND ALLOCATION - $100,000)
    21             (DESIGN AND CONTINGENCIES - $100,000)
    22         (4)  S.R.0770 BRIDGE OVER SHEPPARD RUN,
    23             BRADFORD TOWNSHIP, BRIDGE REPLACEMENT         725,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $525,000)
    26             (LAND ALLOCATION - $100,000)
    27             (DESIGN AND CONTINGENCIES - $100,000)
    28         (5)  S.R.0006 BRIDGE OVER ALLEGHENY RIVER,
    29             PORT ALLEGHENY BOROUGH, BRIDGE
    30             REPLACEMENT                                 4,050,000
    19910H1959B3288                 - 138 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $3,600,000)
     3             (LAND ALLOCATION - $150,000)
     4             (DESIGN AND CONTINGENCIES - $300,000)
     5         (6)  S.R.0006 BRIDGE OVER CONRAIL, PORT
     6             ALLEGHENY BOROUGH, BRIDGE REPLACEMENT       1,850,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $1,500,000)
     9             (LAND ALLOCATION - $150,000)
    10             (DESIGN AND CONTINGENCIES - $200,000)
    11         (7)  S.R.0155 BRIDGE OVER ALLEGHENY RIVER,
    12             PORT ALLEGHENY BOROUGH, BRIDGE
    13             REPLACEMENT                                 2,550,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $2,150,000)
    16             (LAND ALLOCATION - $150,000)
    17             (DESIGN AND CONTINGENCIES - $250,000)
    18         (8)  S.R.0155 BRIDGE OVER ROCK RUN, ANNIN
    19             TOWNSHIP, BRIDGE REPLACEMENT                  650,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $450,000)
    22             (LAND ALLOCATION - $100,000)
    23             (DESIGN AND CONTINGENCIES - $100,000)
    24         (9)  S.R.0219, BRADFORD BYPASS BRIDGE OVER
    25             S.R.0346 AND S.R.4013, FOSTER TOWNSHIP,
    26             BRIDGE REPLACEMENT                            250,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $200,000)
    29             (DESIGN AND CONTINGENCIES - $50,000)
    30         (10)  S.R.3006 BRIDGE OVER KINZUA CREEK,
    19910H1959B3288                 - 139 -

     1             LAFAYETTE TOWNSHIP, BRIDGE REPLACEMENT      1,250,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $950,000)
     4             (LAND ALLOCATION - $150,000)
     5             (DESIGN AND CONTINGENCIES - $150,000)
     6         (11)  S.R.4004, TUNUNGAWANT CREEK BRIDGE
     7             NO.1 OVER WEST BRANCH OF TUNUNGAWANT
     8             CREEK, BRADFORD TOWNSHIP, BRIDGE
     9             REPLACEMENT                                 1,250,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $1,000,000)
    12             (LAND ALLOCATION - $100,000)
    13             (DESIGN AND CONTINGENCIES - $150,000)
    14  SECTION 47.  MERCER COUNTY.
    15     (A)  LOCAL BRIDGES
    16         (1)  BRIDGE NO.43710104232323, BRIDGE
    17             REPLACEMENT                                   315,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $280,000)
    20             (LAND ALLOCATION - $5,000)
    21             (DESIGN AND CONTINGENCIES - $30,000)
    22         (2)  FAIRVIEW TOWNSHIP, MCCARTNEY ROAD,
    23             BRIDGE REPLACEMENT                            208,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $180,000)
    26             (LAND ALLOCATION - $5,000)
    27             (DESIGN AND CONTINGENCIES - $23,000)
    28         (3)  FINDLEY TOWNSHIP, CRIBBS ROAD, BRIDGE
    29             REPLACEMENT                                   230,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19910H1959B3288                 - 140 -

     1             $200,000)
     2             (LAND ALLOCATION - $5,000)
     3             (DESIGN AND CONTINGENCIES - $25,000)
     4         (4)  COALSPRING TOWNSHIP, MCEWEN ROAD,
     5             BRIDGE REPLACEMENT                            208,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $180,000)
     8             (LAND ALLOCATION - $5,000)
     9             (DESIGN AND CONTINGENCIES - $23,000)
    10         (5)  HERMITAGE BOROUGH, KELLY ROAD, BRIDGE
    11             REPLACEMENT                                   851,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $784,000)
    14             (LAND ALLOCATION - $7,000)
    15             (DESIGN AND CONTINGENCIES - $60,000)
    16         (6)  HEMPFIELD TOWNSHIP, BLAHERT ROAD,
    17             BRIDGE REPLACEMENT                            220,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $190,000)
    20             (LAND ALLOCATION - $5,000)
    21             (DESIGN AND CONTINGENCIES - $25,000)
    22         (7)  PERRY TOWNSHIP, PIERSON ROAD, BRIDGE
    23             REPLACEMENT                                   647,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $558,000)
    26             (LAND ALLOCATION - $5,000)
    27             (DESIGN AND CONTINGENCIES - $84,000)
    28         (8)  JEFFERSON TOWNSHIP, FULLINGMILL ROAD,
    29             BRIDGE REPLACEMENT                            230,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19910H1959B3288                 - 141 -

     1             $200,000)
     2             (LAND ALLOCATION - $5,000)
     3             (DESIGN AND CONTINGENCIES - $25,000)
     4         (9)  HERMITAGE BOROUGH, KELLEY ROAD, BRIDGE
     5             REPLACEMENT                                 1,020,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $941,000)
     8             (LAND ALLOCATION - $7,000)
     9             (DESIGN AND CONTINGENCIES - $72,000)
    10         (10)  LAKE TOWNSHIP, CANNON ROAD, BRIDGE
    11             REPLACEMENT                                   414,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $335,000)
    14             (LAND ALLOCATION - $5,000)
    15             (DESIGN AND CONTINGENCIES - $74,000)
    16         (11)  GROVE CITY, EAST PINE STREET, BRIDGE
    17             REPLACEMENT                                   867,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $794,000)
    20             (LAND ALLOCATION - $5,000)
    21             (DESIGN AND CONTINGENCIES - $68,000)
    22         (12)  CITY OF SHARON, OAKLAND AVENUE,
    23             BRIDGE REPLACEMENT                          3,757,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $3,180,000)
    26             (LAND ALLOCATION - $100,000)
    27             (DESIGN AND CONTINGENCIES - $477,000)
    28         (13)  FRENCH CREEK TOWNSHIP, LOWER ROAD,
    29             BRIDGE REPLACEMENT                            398,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19910H1959B3288                 - 142 -

     1             $320,000)
     2             (LAND ALLOCATION - $5,000)
     3             (DESIGN AND CONTINGENCIES - $73,000)
     4         (14)  WOLF CREEK TOWNSHIP, JACK ROAD,
     5             BRIDGE REPLACEMENT                            320,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $274,000)
     8             (LAND ALLOCATION - $5,000)
     9             (DESIGN AND CONTINGENCIES - $41,000)
    10         (15)  SANDY LAKE, WALNUT STREET, BRIDGE
    11             REPLACEMENT                                   230,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $200,000)
    14             (LAND ALLOCATION - $5,000)
    15             (DESIGN AND CONTINGENCIES - $25,000)
    16         (16)  PERRY TOWNSHIP, MILL ROAD, BRIDGE
    17             REPLACEMENT                                   593,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $511,000)
    20             (LAND ALLOCATION - $5,000)
    21             (DESIGN AND CONTINGENCIES - $77,000)
    22         (17)  NEW VERNON TOWNSHIP, BETTY BOYDE
    23             ROAD, BRIDGE REPLACEMENT                      208,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $180,000)
    26             (LAND ALLOCATION - $5,000)
    27             (DESIGN AND CONTINGENCIES - $23,000)
    28         (18)  FAIRVIEW TOWNSHIP, GENGER ROAD,
    29             BRIDGE REPLACEMENT                            208,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19910H1959B3288                 - 143 -

     1             $180,000)
     2             (LAND ALLOCATION - $5,000)
     3             (DESIGN AND CONTINGENCIES - $23,000)
     4         (19)  LAKE TOWNSHIP, STECKLER ROAD, BRIDGE
     5             REPLACEMENT                                   230,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $200,000)
     8             (LAND ALLOCATION - $5,000)
     9             (DESIGN AND CONTINGENCIES - $25,000)
    10         (20)  SHENANGO TOWNSHIP, RIGGS ROAD, BRIDGE
    11             REPLACEMENT                                   252,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $220,000)
    14             (LAND ALLOCATION - $5,000)
    15             (DESIGN AND CONTINGENCIES - $27,000)
    16         (21)  WOLF CREEK TOWNSHIP, GILL ROAD,
    17             BRIDGE REPLACEMENT                            230,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $200,000)
    20             (LAND ALLOCATION - $5,000)
    21             (DESIGN AND CONTINGENCIES - $25,000)
    22         (22)  GREENVILLE, RACE STREET, BRIDGE
    23             REPLACEMENT                                   778,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $672,000)
    26             (LAND ALLOCATION - $5,000)
    27             (DESIGN AND CONTINGENCIES - $101,000)
    28         (23)  SUGAR GROVE TOWNSHIP, GARDNER HILL
    29             ROAD, BRIDGE REPLACEMENT                      230,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19910H1959B3288                 - 144 -

     1             $200,000)
     2             (LAND ALLOCATION - $5,000)
     3             (DESIGN AND CONTINGENCIES - $25,000)
     4         (24)  FINDLEY TOWNSHIP, UBER ROAD, BRIDGE
     5             REPLACEMENT                                   208,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $180,000)
     8             (LAND ALLOCATION - $5,000)
     9             (DESIGN AND CONTINGENCIES - $23,000)
    10         (25)  MILL CREEK TOWNSHIP, DEEMERS ROAD,
    11             BRIDGE REPLACEMENT                            285,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $250,000)
    14             (LAND ALLOCATION - $5,000)
    15             (DESIGN AND CONTINGENCIES - $30,000)
    16         (26)  WOLF CREEK TOWNSHIP, GILMORE ROAD,
    17             BRIDGE REPLACEMENT                            208,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $180,000)
    20             (LAND ALLOCATION - $5,000)
    21             (DESIGN AND CONTINGENCIES - $23,000)
    22         (27)  GROVE CITY, CHESTNUT STREET, BRIDGE
    23             REPLACEMENT                                 2,871,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $2,666,000)
    26             (LAND ALLOCATION - $5,000)
    27             (DESIGN AND CONTINGENCIES - $200,000)
    28         (28)  SANDY CREEK TOWNSHIP, COUNTY LINE
    29             ROAD, BRIDGE REPLACEMENT                      297,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19910H1959B3288                 - 145 -

     1             $254,000)
     2             (LAND ALLOCATION - $5,000)
     3             (DESIGN AND CONTINGENCIES - $38,000)
     4         (29)  LAKE TOWNSHIP, FARM ROAD, BRIDGE
     5             REPLACEMENT                                   208,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $180,000)
     8             (LAND ALLOCATION - $5,000)
     9             (DESIGN AND CONTINGENCIES - $23,000)
    10         (30)  WEST MIDDLESEX, CEMETARY ROAD, BRIDGE
    11             REPLACEMENT                                   297,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $254,000)
    14             (LAND ALLOCATION - $5,000)
    15             (DESIGN AND CONTINGENCIES - $38,000)
    16         (31)  JEFFERSON TOWNSHIP, CLAY FURNACE
    17             ROAD, BRIDGE REPLACEMENT                      208,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $180,000)
    20             (LAND ALLOCATION - $5,000)
    21             (DESIGN AND CONTINGENCIES - $23,000)
    22         (32)  JACKSON TOWNSHIP, FOX MINE ROAD,
    23             BRIDGE REPLACEMENT                            230,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $200,000)
    26             (LAND ALLOCATION - $5,000)
    27             (DESIGN AND CONTINGENCIES - $25,000)
    28         (33)  CITY OF HERMITAGE, T-388, KELLY ROAD
    29             BRIDGE NO.1 OVER SHENANGO RIVER, BRIDGE
    30             REPLACEMENT                                   851,000
    19910H1959B3288                 - 146 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $784,000)
     3             (LAND ALLOCATION - $7,000)
     4             (DESIGN AND CONTINGENCIES - $60,000)
     5     (B)  STATE BRIDGES
     6         (1)  S.R.0062 OVER SHENANGO RIVER, BRIDGE
     7             REPLACEMENT                                 1,550,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $1,400,000)
    10             (LAND ALLOCATION - $50,000)
    11             (DESIGN AND CONTINGENCIES - $100,000)
    12         (2)  S.R.0062 OVER SOUTH DOCK VALLEY WAY,
    13             BRIDGE REPLACEMENT                          1,850,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $1,700,000)
    16             (LAND ALLOCATION - $50,000)
    17             (DESIGN AND CONTINGENCIES - $100,000)
    18         (3)  S.R.0062 OVER CONRAIL RAILROAD, BRIDGE
    19             REPLACEMENT                                 1,750,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $1,600,000)
    22             (LAND ALLOCATION - $50,000)
    23             (DESIGN AND CONTINGENCIES - $100,000)
    24         (4)  S.R.0058 ON KINSMAN ROAD OVER SUGAR
    25             RUN, GREENE TOWNSHIP, BRIDGE
    26             REPLACEMENT                                   300,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $255,000)
    29             (LAND ALLOCATION - $15,000)
    30             (DESIGN AND CONTINGENCIES - $30,000)
    19910H1959B3288                 - 147 -

     1         (5)  S.R.3022 ON RUTLEDGE ROAD OVER
     2             LACKAWANNOCK CREEK, JEFFERSON TOWNSHIP,
     3             BRIDGE REPLACEMENT                            300,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $255,000)
     6             (LAND ALLOCATION - $15,000)
     7             (DESIGN AND CONTINGENCIES - $30,000)
     8         (6)  S.R.0318 ON WEST MIDDLESEX-MERCER ROAD
     9             OVER LITTLE NESHANNOCK CREEK, EAST
    10             LACKAWANNOCK TOWNSHIP, BRIDGE
    11             REPLACEMENT                                   430,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $365,000)
    14             (LAND ALLOCATION - $20,000)
    15             (DESIGN AND CONTINGENCIES - $45,000)
    16         (7)  S.R.3013 ON ORCHARD ROAD OVER
    17             INTERSTATE 80, BMS 4330130070000,
    18             LACKAWANNOCK TOWNSHIP, BRIDGE
    19             REHABILITATION                                900,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $765,000)
    22             (LAND ALLOCATION - $45,000)
    23             (DESIGN AND CONTINGENCIES - $90,000)
    24         (8)  S.R.0019 ON PERRY HIGHWAY OVER
    25             TRIBUTARY OF LITTLE SHENANGO RIVER,
    26             PERRY TOWNSHIP, BRIDGE REPLACEMENT            210,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $180,000)
    29             (LAND ALLOCATION - $10,000)
    30             (DESIGN AND CONTINGENCIES - $20,000)
    19910H1959B3288                 - 148 -

     1         (9)  S.R.0718 ON STATE STREET OVER SHENANGO
     2             RIVER, CITY OF SHARON, BRIDGE
     3             REHABILITATION                                800,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $680,000)
     6             (LAND ALLOCATION - $40,000)
     7             (DESIGN AND CONTINGENCIES - $80,000)
     8  SECTION 48.  MIFFLIN COUNTY.
     9     (A)  LOCAL BRIDGES (RESERVED)
    10     (B)  STATE BRIDGES
    11         (1)  S.R.3021, NEWTON HAMILTON BRIDGE OVER
    12             JUNIATA RIVER, NEWTON HAMILTON BOROUGH,
    13             BRIDGE REPLACEMENT                          5,250,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $4,750,000)
    16             (LAND ALLOCATION - $200,000)
    17             (DESIGN AND CONTINGENCIES - $300,000)
    18         (2)  S.R.0522 BRIDGE OVER BRANCH OF JACKS
    19             CREEK, DECATUR TOWNSHIP, BRIDGE
    20             REPLACEMENT                                   600,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $400,000)
    23             (LAND ALLOCATION - $100,000)
    24             (DESIGN AND CONTINGENCIES - $100,000)
    25         (3)  S.R.2007 BRIDGE OVER KISHACOQUILLAS
    26             CREEK, DERRY TOWNSHIP, BRIDGE
    27             REPLACEMENT                                   925,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $700,000)
    30             (LAND ALLOCATION - $100,000)
    19910H1959B3288                 - 149 -

     1             (DESIGN AND CONTINGENCIES - $125,000)
     2  SECTION 49.  MONROE COUNTY.
     3     (A)  LOCAL BRIDGES
     4         (1)  TUNKHANNOCK TOWNSHIP, T-629, OVER
     5             TUNKHANNOCK CREEK, BRIDGE REPLACEMENT         190,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $140,000)
     8             (LAND ALLOCATION - $20,000)
     9             (DESIGN AND CONTINGENCIES - $30,000)
    10         (2)  TUNKHANNOCK TOWNSHIP, T-633, BRIDGE
    11             OVER TUNKHANNOCK CREEK, BRIDGE
    12             REPLACEMENT                                   139,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $121,000)
    15             (LAND ALLOCATION - $6,000)
    16             (DESIGN AND CONTINGENCIES - $12,000)
    17         (3)  STROUD TOWNSHIP, T-410 BRIDGE OVER
    18             CHERRY CREEK, BRIDGE REPLACEMENT              127,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $110,000)
    21             (LAND ALLOCATION - $6,000)
    22             (DESIGN AND CONTINGENCIES - $11,000)
    23         (4)  HAMILTON TOWNSHIP, T-202, LAKE CIRCLE
    24             BRIDGE, BRIDGE REPLACEMENT                    126,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $101,000)
    27             (LAND ALLOCATION - $5,000)
    28             (DESIGN AND CONTINGENCIES - $20,000)
    29         (5)  HAMILTON TOWNSHIP, T-414, BRIDGE NO.7,
    30             BRIDGE REPLACEMENT                            522,000
    19910H1959B3288                 - 150 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $457,000)
     3             (LAND ALLOCATION - $20,000)
     4             (DESIGN AND CONTINGENCIES - $45,000)
     5         (6)  JACKSON TOWNSHIP, T-486, TROUT LAKE
     6             BRIDGE, BRIDGE REPLACEMENT                    184,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $160,000)
     9             (LAND ALLOCATION - $8,000)
    10             (DESIGN AND CONTINGENCIES - $16,000)
    11         (7)  STROUD TOWNSHIP, T-420, BRIDGE OVER
    12             CHERRY CREEK, BRIDGE REPLACEMENT              169,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $143,000)
    15             (LAND ALLOCATION - $6,000)
    16             (DESIGN AND CONTINGENCIES - $20,000)
    17         (8)  SMITHFIELD TOWNSHIP, T-539, BRIDGE
    18             OVER MARSHALLS CREEK, BRIDGE
    19             REPLACEMENT                                   298,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $267,000)
    22             (LAND ALLOCATION - $5,000)
    23             (DESIGN AND CONTINGENCIES - $26,000)
    24     (B)  STATE BRIDGES
    25         (1)  S.R.0402 AT RESSICA FALLS, MIDDLE
    26             SMITHFIELD TOWNSHIP, BRIDGE
    27             REPLACEMENT                                 1,426,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $1,060,000)
    30             (LAND ALLOCATION - $60,000)
    19910H1959B3288                 - 151 -

     1             (DESIGN AND CONTINGENCIES - $306,000)
     2         (2)  S.R.0033 OVER S.R.0209, HAMILTON
     3             TOWNSHIP, BRIDGE REPLACEMENT                  195,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $177,000)
     6             (DESIGN AND CONTINGENCIES - $18,000)
     7         (3)  S.R.2012 HAMILTON EAST ROAD OVER
     8             MCMICHAEL CREEK, HAMILTON TOWNSHIP,
     9             BRIDGE REPLACEMENT                            140,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $100,000)
    12             (LAND ALLOCATION - $20,000)
    13             (DESIGN AND CONTINGENCIES - $20,000)
    14         (4)  S.R.2004 OVER S.R.0033, HAMILTON
    15             TOWNSHIP, BRIDGE REPLACEMENT                  335,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $304,000)
    18             (DESIGN AND CONTINGENCIES - $31,000)
    19         (5)  S.R.2003 OVER CHERRY CREEK, HAMILTON
    20             TOWNSHIP, BRIDGE REPLACEMENT                  137,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $79,000)
    23             (LAND ALLOCATION - $5,000)
    24             (DESIGN AND CONTINGENCIES - $53,000)
    25         (6)  S.R.3018 OVER KETTLE CREEK II,
    26             HAMILTON TOWNSHIP, BRIDGE REPLACEMENT          68,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $59,000)
    29             (LAND ALLOCATION - $3,000)
    30             (DESIGN AND CONTINGENCIES - $6,000)
    19910H1959B3288                 - 152 -

     1         (7)  S.R.3018 OVER KETTLE CREEK I, HAMILTON
     2             TOWNSHIP, BRIDGE REPLACEMENT                   80,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $70,000)
     5             (LAND ALLOCATION - $3,000)
     6             (DESIGN AND CONTINGENCIES - $7,000)
     7         (8)  S.R.2017 OVER I-80, EAST STROUDSBURG
     8             BOROUGH, BRIDGE REPLACEMENT                   381,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $317,000)
    11             (DESIGN AND CONTINGENCIES - $64,000)
    12         (9)  S.R.0080 WATER GAP BRIDGE OVER CHERRY
    13             CREEK, DELAWARE WATER GAP, BRIDGE
    14             REPLACEMENT                                   795,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $723,000)
    17             (DESIGN AND CONTINGENCIES - $72,000)
    18         (10)  S.R.0447 AT LEAVETTS BRANCH, BARRETT
    19             TOWNSHIP, BRIDGE REPLACEMENT                  255,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $175,000)
    22             (LAND ALLOCATION - $10,000)
    23             (DESIGN AND CONTINGENCIES - $70,000)
    24         (11)  S.R.0611 AT ERIE/LACKAWANNA RAILROAD,
    25             COOLBAUGH TOWNSHIP, BRIDGE REPLACEMENT        608,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $521,000)
    28             (LAND ALLOCATION - $10,000)
    29             (DESIGN AND CONTINGENCIES - $77,000)
    30         (12)  S.R.0423 OVER TOBYHANNA CREEK,
    19910H1959B3288                 - 153 -

     1             COOLBAUGH TOWNSHIP, BRIDGE REPLACEMENT        194,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $163,000)
     4             (DESIGN AND CONTINGENCIES - $31,000)
     5         (13)  S.R.2030 OVER I-80, DELAWARE WATER
     6             GAP, BRIDGE REPLACEMENT                       450,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $409,000)
     9             (DESIGN AND CONTINGENCIES - $41,000)
    10         (14)  S.R.1014 OVER WALLENPAUPACK CREEK,
    11             COOLBAUGH TOWNSHIP, BRIDGE REPLACEMENT        140,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $100,000)
    14             (LAND ALLOCATION - $20,000)
    15             (DESIGN AND CONTINGENCIES - $20,000)
    16         (15)  S.R.4007 OVER STEAMTOWN RAILROAD,
    17             MOUNT POCONO BOROUGH, BRIDGE
    18             REPLACEMENT                                   820,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $700,000)
    21             (LAND ALLOCATION - $50,000)
    22             (DESIGN AND CONTINGENCIES - $70,000)
    23         (16)  S.R.3022 OVER MCMICHAELS CREEK,
    24             HAMILTON TOWNSHIP, BRIDGE REPLACEMENT         161,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $140,000)
    27             (LAND ALLOCATION - $7,000)
    28             (DESIGN AND CONTINGENCIES - $14,000)
    29         (17)  S.R.4001 AT LONG POND, TUNKHANNOCK
    30             TOWNSHIP, BRIDGE REPLACEMENT                  425,000
    19910H1959B3288                 - 154 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $300,000)
     3             (LAND ALLOCATION - $50,000)
     4             (DESIGN AND CONTINGENCIES - $75,000)
     5         (18)  S.R.0940 AT POCONO SUMMIT, TOBYHANNA
     6             TOWNSHIP, BRIDGE REPLACEMENT                4,850,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $4,600,000)
     9             (LAND ALLOCATION - $50,000)
    10             (DESIGN AND CONTINGENCIES - $200,000)
    11         (19)  S.R.0940 OVER TOBYHANNA CREEK,
    12             TOBYHANNA TOWNSHIP, BRIDGE REPLACEMENT      1,240,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $1,100,000)
    15             (LAND ALLOCATION - $60,000)
    16             (DESIGN AND CONTINGENCIES - $80,000)
    17         (20)  S.R.0191 OVER MCMICHAELS CREEK,
    18             STROUDSBURG BOROUGH, BRIDGE
    19             REPLACEMENT                                   520,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $472,000)
    22             (DESIGN AND CONTINGENCIES - $48,000)
    23         (21)  S.R.0191 UNDER RAILROAD, POCONO
    24             TOWNSHIP, BRIDGE REPLACEMENT                1,400,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $1,000,000)
    27             (LAND ALLOCATION - $200,000)
    28             (DESIGN AND CONTINGENCIES - $200,000)
    29         (22)  S.R.0209 OVER I-80, SMITHFIELD
    30             TOWNSHIP, BRIDGE REPLACEMENT                  368,000
    19910H1959B3288                 - 155 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $334,000)
     3             (DESIGN AND CONTINGENCIES - $34,000)
     4         (23)  S.R.8024 AT I-80 RAMP, SMITHFIELD
     5             TOWNSHIP, BRIDGE REPLACEMENT                  759,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $690,000)
     8             (DESIGN AND CONTINGENCIES - $69,000)
     9         (24)  S.R.1005 OVER BUFFALO RUN, STROUD
    10             TOWNSHIP, BRIDGE REPLACEMENT                  103,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $90,000)
    13             (LAND ALLOCATION - $4,000)
    14             (DESIGN AND CONTINGENCIES - $9,000)
    15         (25)  S.R.0191 OVER BROADHEAD CREEK, STROUD
    16             TOWNSHIP, BRIDGE REPLACEMENT                  843,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $648,000)
    19             (LAND ALLOCATION - $65,000)
    20             (DESIGN AND CONTINGENCIES - $130,000)
    21         (26)  S.R.3022 OVER MCMICHAEL CREEK,
    22             HAMILTON TOWNSHIP, BRIDGE REPLACEMENT         161,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $140,000)
    25             (LAND ALLOCATION - $7,000)
    26             (DESIGN AND CONTINGENCIES - $14,000)
    27  SECTION 50.  MONTGOMERY COUNTY.
    28     (A)  LOCAL BRIDGES
    29         (1)  CHELTENHAM TOWNSHIP, MILL ROAD BRIDGE
    30             OVER TOOKANY CREEK BETWEEN CHURCH ROAD
    19910H1959B3288                 - 156 -

     1             AND HARRISON AVENUE, ELKINS PARK,
     2             BRIDGE REPLACEMENT                            360,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $300,000)
     5             (LAND ALLOCATION - $15,000)
     6             (DESIGN AND CONTINGENCIES - $45,000)
     7         (2)  CHELTENHAM TOWNSHIP, FOREST AVENUE
     8             BRIDGE OVER TOOKANY CREEK AT THE
     9             INTERSECTION OF FOREST AVENUE AND
    10             SHOEMAKER ROAD, ELKINS PARK, BRIDGE
    11             REPLACEMENT                                   285,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $250,000)
    14             (DESIGN AND CONTINGENCIES - $35,000)
    15         (3)  CHELTENHAM TOWNSHIP, SERPENTINE LANE
    16             BRIDGE OVER ROCK LANE CREEK BETWEEN
    17             ROCK LANE AND IVY LANE, ELKINS PARK,
    18             BRIDGE REPLACEMENT                            230,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $200,000)
    21             (DESIGN AND CONTINGENCIES - $30,000)
    22         (4)  CHELTENHAM TOWNSHIP, TOOKANY CREEK
    23             PARKWAY BRIDGE OVER TOOKANY CREEK 500
    24             FEET EAST OF NEW SECOND STREET, ELKINS
    25             PARK, BRIDGE REPLACEMENT                      345,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $300,000)
    28             (DESIGN AND CONTINGENCIES - $45,000)
    29         (5)  CHELTENHAM TOWNSHIP, ASHMEAD ROAD
    30             BRIDGE OVER TOOKANY CREEK 100 FEET
    19910H1959B3288                 - 157 -

     1             SOUTH OF TOOKANY CREEK PARKWAY,
     2             CHELTENHAM, BRIDGE REPLACEMENT                400,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $350,000)
     5             (DESIGN AND CONTINGENCIES - $50,000)
     6         (6)  TRAPPE BOROUGH AND PERKIOMEN TOWNSHIP,
     7             BETCHER ROAD BRIDGE OVER BRANCH OF
     8             SCHOOL HOUSE RUN, BRIDGE REPLACEMENT           73,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $66,000)
    11             (DESIGN AND CONTINGENCIES - $7,000)
    12         (7)  TRAPPE BOROUGH, WEST FIRST AVENUE
    13             BRIDGE OVER DONNY BROOK CREEK, BRIDGE
    14             REPLACEMENT                                    49,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $44,000)
    17             (DESIGN AND CONTINGENCIES - $5,000)
    18         (8)  ABINGTON TOWNSHIP, REVELATION ROAD,
    19             BRIDGE REPLACEMENT                            600,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $400,000)
    22             (LAND ALLOCATION - $100,000)
    23             (DESIGN AND CONTINGENCIES - $100,000)
    24         (9)  ABINGTON TOWNSHIP, OSCEOLA AVENUE,
    25             BRIDGE REPLACEMENT                            300,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $200,000)
    28             (LAND ALLOCATION - $50,000)
    29             (DESIGN AND CONTINGENCIES - $50,000)
    30         (10)  ABINGTON TOWNSHIP, CADWALADER AVENUE,
    19910H1959B3288                 - 158 -

     1             BRIDGE REPLACEMENT                            300,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $200,000)
     4             (LAND ALLOCATION - $50,000)
     5             (DESIGN AND CONTINGENCIES - $50,000)
     6         (11)  ABINGTON TOWNSHIP, TULPEHOCKEN
     7             AVENUE, BRIDGE REPLACEMENT                    300,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $200,000)
    10             (LAND ALLOCATION - $50,000)
    11             (DESIGN AND CONTINGENCIES - $50,000)
    12         (12)  ABINGTON TOWNSHIP, RYDAL ROAD AT
    13             CLOVERLY LANE, BRIDGE REPLACEMENT             300,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $200,000)
    16             (LAND ALLOCATION - $50,000)
    17             (DESIGN AND CONTINGENCIES - $50,000)
    18         (13)  ABINGTON TOWNSHIP, MEADOWBROOK ROAD
    19             BETWEEN STOCTON ROAD AND VALLEY ROAD,
    20             BRIDGE REPLACEMENT                            425,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $300,000)
    23             (LAND ALLOCATION - $50,000)
    24             (DESIGN AND CONTINGENCIES - $75,000)
    25         (14)  ABINGTON TOWNSHIP, STOCTON ROAD AT
    26             MEADOWBROOK ROAD, BRIDGE REPLACEMENT          350,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $250,000)
    29             (LAND ALLOCATION - $50,000)
    30             (DESIGN AND CONTINGENCIES - $50,000)
    19910H1959B3288                 - 159 -

     1         (15)  ABINGTON TOWNSHIP, PAUL BROOK LANE,
     2             BRIDGE REPLACEMENT                            350,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $250,000)
     5             (LAND ALLOCATION - $50,000)
     6             (DESIGN AND CONTINGENCIES - $50,000)
     7         (16)  ABINGTON TOWNSHIP, JOHNSTON AVENUE AT
     8             RADCLIFFE AVENUE, BRIDGE REPLACEMENT          550,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $400,000)
    11             (LAND ALLOCATION - $50,000)
    12             (DESIGN AND CONTINGENCIES - $100,000)
    13         (17)  ABINGTON TOWNSHIP, WASHINGTON LANE,
    14             300 FEET SOUTH OF FROG HOLLOW ROAD,
    15             BRIDGE REPLACEMENT                          2,700,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $2,000,000)
    18             (LAND ALLOCATION - $200,000)
    19             (DESIGN AND CONTINGENCIES - $500,000)
    20         (18)  ABINGTON TOWNSHIP, L.R.46115, STATION
    21             50-98, NORTH HILLS AVENUE, BRIDGE
    22             REPLACEMENT                                   340,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $200,000)
    25             (LAND ALLOCATION - $100,000)
    26             (DESIGN AND CONTINGENCIES - $40,000)
    27         (19)  PLYMOUTH TOWNSHIP, BELVOIR ROAD
    28             BRIDGE OVER SAW MILL CREEK, BRIDGE
    29             REPLACEMENT                                   445,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19910H1959B3288                 - 160 -

     1             $400,000)
     2             (DESIGN AND CONTINGENCIES - $45,000)
     3     (B)  STATE BRIDGES
     4         (1)  S.R.3051, OLD BETZWOOD BRIDGE OVER
     5             SCHUYLKILL RIVER, WEST NORRITON AND
     6             UPPER MERION TOWNSHIPS, BRIDGE
     7             REPLACEMENT                                 5,500,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $4,800,000)
    10             (LAND ALLOCATION - $150,000)
    11             (DESIGN AND CONTINGENCIES - $550,000)
    12         (2)  S.R.4040, GILBERTSVILLE ROAD BRIDGE
    13             OVER BRANCH OF MINISTER CREEK, DOUGLASS
    14             TOWNSHIP, BRIDGE REPLACEMENT                  215,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $175,000)
    17             (LAND ALLOCATION - $20,000)
    18             (DESIGN AND CONTINGENCIES - $20,000)
    19         (3)  S.R.3020, DANNE HOWER BRIDGE OVER
    20             SCHUYLKILL RIVER, UPPER MERION AND
    21             NORRISTOWN, BRIDGE DECK REHABILITATION     11,000,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $10,450,000)
    24             (DESIGN AND CONTINGENCIES - $550,000)
    25         (4)  S.R.0100, PA.100 SOUTH OF PA.724 TO
    26             BERKS COUNTY LINE, 11 BRIDGES
    27             APPROXIMATELY, DOUGLASS, UPPER
    28             POTTSGROVE, POTTSTOWN AND NORTH
    29             COVENTRY TOWNSHIPS, BRIDGE DECK
    30             REHABILITATION                              3,800,000
    19910H1959B3288                 - 161 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $3,610,000)
     3             (DESIGN AND CONTINGENCIES - $190,000)
     4         (5)  S.R.0063, WELSH ROAD BRIDGE OVER
     5             PENNYPACK CREEK, LOWER MORELAND
     6             TOWNSHIP, BRIDGE REPLACEMENT                  215,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $175,000)
     9             (LAND ALLOCATION - $20,000)
    10             (DESIGN AND CONTINGENCIES - $20,000)
    11         (6)  S.R.0073, WASHINGTON LANE BRIDGE OVER
    12             SEPTA, CHELTENHAM TOWNSHIP, BRIDGE DECK
    13             REHABILITATION                              2,990,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $2,840,000)
    16             (DESIGN AND CONTINGENCIES - $150,000)
    17         (7)  S.R.2034, EDGEHILL ROAD AND YORK ROAD,
    18             ABINGTON TOWNSHIP, BRIDGE DECK
    19             REHABILITATION                                250,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $237,000)
    22             (DESIGN AND CONTINGENCIES - $13,000)
    23         (8)  S.R.2025, CENTRAL AVENUE BRIDGE OVER
    24             TACONY CREEK, CHELTENHAM TOWNSHIP,
    25             BRIDGE REPLACEMENT                            650,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $500,000)
    28             (LAND ALLOCATION - $75,000)
    29             (DESIGN AND CONTINGENCIES - $75,000)
    30         (9)  MEETINGHOUSE ROAD, BRIDGE OVER BRANCH
    19910H1959B3288                 - 162 -

     1             OF TACONY CREEK, ABINGTON TOWNSHIP,
     2             BRIDGE REPLACEMENT                            285,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $160,000)
     5             (LAND ALLOCATION - $100,000)
     6             (DESIGN AND CONTINGENCIES - $25,000)
     7         (10)  MILL ROAD BRIDGE OVER MEADOWBROOK
     8             CREEK, ABINGTON TOWNSHIP, BRIDGE
     9             REPLACEMENT                                 2,100,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $1,500,000)
    12             (LAND ALLOCATION - $200,000)
    13             (DESIGN AND CONTINGENCIES - $400,000)
    14  SECTION 51.  MONTOUR COUNTY.
    15     (A)  LOCAL BRIDGES (RESERVED)
    16     (B)  STATE BRIDGES
    17         (1)  S.R.3006 BRIDGE OVER BRANCH OF BEAVER
    18             RUN, LIBERTY TOWNSHIP, BRIDGE
    19             REPLACEMENT                                   322,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $269,000)
    22             (LAND ALLOCATION - $30,000)
    23             (DESIGN AND CONTINGENCIES - $23,000)
    24         (2)  S.R.0054, DANVILLE - RIVERSIDE BRIDGE
    25             OVER SUSQUEHANNA RIVER, DANVILLE
    26             BOROUGH, BRIDGE REHABILITATION              1,430,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $1,300,000)
    29             (DESIGN AND CONTINGENCIES - $130,000)
    30  SECTION 52. NORTHAMPTON COUNTY.
    19910H1959B3288                 - 163 -

     1     (A)  LOCAL BRIDGES
     2         (1)  CITY OF EASTON, MARKET STREET, BRIDGE
     3             REPLACEMENT                                    83,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $72,000)
     6             (DESIGN AND CONTINGENCIES - $11,000)
     7         (2)  CITY OF EASTON, CHURCH STREET, BRIDGE
     8             REPLACEMENT                                    28,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $25,000)
    11             (DESIGN AND CONTINGENCIES - $3,000)
    12         (3)  BUSHKILL TOWNSHIP, T-638, KELLER ROAD
    13             OVER TRIBUTARY TO BUSHKILL CREEK,
    14             BRIDGE REPLACEMENT                            110,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $70,000)
    17             (LAND ALLOCATION - $10,000)
    18             (DESIGN AND CONTINGENCIES - $30,000)
    19         (4)  PLAINFIELD TOWNSHIP, T-629, COUNTY
    20             BRIDGE NO.207 OVER WIND GAP CREEK,
    21             BRIDGE REPLACEMENT                            150,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $115,000)
    24             (LAND ALLOCATION - $10,000)
    25             (DESIGN AND CONTINGENCIES - $25,000)
    26         (5)  CITY OF EASTON, BUSHKILL DRIVE OVER
    27             BUSHKILL CREEK, BRIDGE REPLACEMENT            530,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $450,000)
    30             (LAND ALLOCATION - $10,000)
    19910H1959B3288                 - 164 -

     1             (DESIGN AND CONTINGENCIES - $70,000)
     2         (6)  ALLEN TOWNSHIP, T-465B, ATLAS ROAD
     3             OVER DRY RUN CREEK, BRIDGE REPLACEMENT        145,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $110,000)
     6             (LAND ALLOCATION - $10,000)
     7             (DESIGN AND CONTINGENCIES - $25,000)
     8         (7)  UPPER MOUNT BETHEL TOWNSHIP, T-701,
     9             COUNTY BRIDGE NO.221 OVER JACOBY CREEK,
    10             BRIDGE REPLACEMENT                            145,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $110,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $25,000)
    15         (8)  LOWER MOUNT BETHEL TOWNSHIP, T-663,
    16             COUNTY BRIDGE NO.202 OVER OUGHOUGHTON
    17             CREEK, BRIDGE REPLACEMENT                     180,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $140,000)
    20             (LAND ALLOCATION - $10,000)
    21             (DESIGN AND CONTINGENCIES - $30,000)
    22         (9)  MOORE TOWNSHIP, T-588, COUNTY BRIDGE
    23             NO.146 OVER HOKENDAQUA CREEK, BRIDGE
    24             REPLACEMENT                                   175,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $135,000)
    27             (LAND ALLOCATION - $10,000)
    28             (DESIGN AND CONTINGENCIES - $30,000)
    29         (10)  LOWER NAZARETH TOWNSHIP, T-436,
    30             COUNTY BRIDGE NO.102 OVER MONOCACY
    19910H1959B3288                 - 165 -

     1             CREEK, BRIDGE REPLACEMENT                     300,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $250,000)
     4             (LAND ALLOCATION - $15,000)
     5             (DESIGN AND CONTINGENCIES - $35,000)
     6         (11)  FREEMANSBURG BOROUGH, CHURCH STREET
     7             BRIDGE OVER CONRAIL, BRIDGE
     8             REPLACEMENT                                   190,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $165,000)
    11             (LAND ALLOCATION - $10,000)
    12             (DESIGN AND CONTINGENCIES - $15,000)
    13         (12)  FREEMANSBURG BOROUGH, MARKET STREET
    14             BRIDGE OVER CONRAIL, BRIDGE
    15             REPLACEMENT                                   190,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $165,000)
    18             (LAND ALLOCATION - $10,000)
    19             (DESIGN AND CONTINGENCIES - $15,000)
    20         (13)  CITY OF BETHLEHEM, LYNN AVENUE BRIDGE
    21             BETWEEN S.R.0412 AND EAST 6TH STREET,
    22             BRIDGE REPLACEMENT                          1,857,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $1,572,000)
    25             (LAND ALLOCATION - $15,000)
    26             (DESIGN AND CONTINGENCIES - $270,000)
    27     (B) STATE BRIDGES
    28         (1)  S.R.0611 FRONT STREET OVER BUSHKILL
    29             CREEK, CITY OF EASTON, BRIDGE
    30             REPLACEMENT                                 1,139,000
    19910H1959B3288                 - 166 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $1,035,000)
     3             (DESIGN AND CONTINGENCIES - $104,000)
     4         (2)  S.R.3020 OVER EAST BRANCH OF THE
     5             MONOCACY CREEK, UPPER NAZARETH
     6             TOWNSHIP, BRIDGE REPLACEMENT                  227,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $174,000)
     9             (LAND ALLOCATION - $35,000)
    10             (DESIGN AND CONTINGENCIES - $18,000)
    11         (3)  S.R.3020 OVER TRIBUTARY TO MONOCACY
    12             CREEK NEAR GEORGETOWN ROAD, LOWER
    13             NAZARETH TOWNSHIP, BRIDGE REPLACEMENT         271,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $208,000)
    16             (LAND ALLOCATION - $42,000)
    17             (DESIGN AND CONTINGENCIES - $21,000)
    18         (4)  S.R.1012 OVER BUSHKILL CREEK, BUSHKILL
    19             TOWNSHIP, BRIDGE REPLACEMENT                  222,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $201,000)
    22             (DESIGN AND CONTINGENCIES - $21,000)
    23         (5)  S.R.2017 13TH STREET OVER S.R.0022,
    24             CITY OF EASTON BRIDGE REPLACEMENT             465,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $422,000)
    27             (DESIGN AND CONTINGENCIES - $43,000)
    28         (6)  S.R.4006 WHITETAIL DEER DRIVE OVER
    29             WEST BRANCH OF MONOCACY CREEK, MOORE
    30             TOWNSHIP, BRIDGE REPLACEMENT                  169,000
    19910H1959B3288                 - 167 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $130,000)
     3             (LAND ALLOCATION - $26,000)
     4             (DESIGN AND CONTINGENCIES - $13,000)
     5         (7)  S.R.0329 OVER LIMESTONE QUARRY, ALLEN
     6             TOWNSHIP, BRIDGE REPLACEMENT                  464,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $356,000)
     9             (LAND ALLOCATION - $72,000)
    10             (DESIGN AND CONTINGENCIES - $36,000)
    11         (8)  S.R.0329 OVER DRY RUN, ALLEN TOWNSHIP,
    12             BRIDGE REPLACEMENT                            146,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $111,000)
    15             (LAND ALLOCATION - $23,000)
    16             (DESIGN AND CONTINGENCIES - $12,000)
    17         (9)  S.R.0329 OVER HOKENDAQUA CREEK,
    18             NORTHAMPTON BOROUGH, BRIDGE
    19             REPLACEMENT                                   812,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $624,000)
    22             (LAND ALLOCATION - $125,000)
    23             (DESIGN AND CONTINGENCIES - $63,000)
    24  SECTION 53.  NORTHUMBERLAND COUNTY.
    25     (A)  LOCAL BRIDGES
    26         (1)  WEST CAMERON TOWNSHIP, T-480, COUNTY
    27             BRIDGE NO.167 OVER MAHANOY CREEK,
    28             BRIDGE REPLACEMENT                            815,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $652,000)
    19910H1959B3288                 - 168 -

     1             (DESIGN AND CONTINGENCIES - $163,000)
     2         (2)  MOUNT CARMEL BOROUGH, NORTH VINE
     3             STREET BRIDGE OVER SHAMOKIN CREEK,
     4             BRIDGE REHABILITATION                         320,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $240,000)
     7             (DESIGN AND CONTINGENCIES - $80,000)
     8         (3)  MILTON BOROUGH, BROWN AVENUE BRIDGE
     9             OVER LIMESTONE RUN, BRIDGE REPLACEMENT        400,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $320,000)
    12             (DESIGN AND CONTINGENCIES - $80,000)
    13         (4)  MILTON BOROUGH, FILBERT STREET BRIDGE
    14             OVER LIMESTONE RUN, BRIDGE REPLACEMENT        650,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $500,000)
    17             (DESIGN AND CONTINGENCIES - $150,000)
    18     (B)  STATE BRIDGES
    19         (1)  S.R.3012, FIDDLERS RUN BRIDGE OVER
    20             FIDDLERS RUN, JACKSON AND LOWER MAHANOY
    21             TOWNSHIPS BRIDGE REPLACEMENT                  407,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $326,000)
    24             (LAND ALLOCATION - $20,000)
    25             (DESIGN AND CONTINGENCIES - $61,000)
    26         (2)  S.R.2016 BRIDGE OVER SHAMOKIN CREEK,
    27             SHAMOKIN TOWNSHIP, BRIDGE REPLACEMENT         789,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $631,000)
    30             (LAND ALLOCATION - $39,000)
    19910H1959B3288                 - 169 -

     1             (DESIGN AND CONTINGENCIES - $119,000)
     2         (3)  S.R.2017 BRIDGE OVER COAL RUN, COAL
     3             TOWNSHIP, BRIDGE REPLACEMENT                  436,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $349,000)
     6             (LAND ALLOCATION - $22,000)
     7             (DESIGN AND CONTINGENCIES - $65,000)
     8  SECTION 54.  PERRY COUNTY.
     9     (A)  LOCAL BRIDGES (RESERVED)
    10     (B)  STATE BRIDGES
    11         (1)  S.R.50014, DELVILLE ROAD BRIDGE OVER
    12             SHERMAN CREEK, PENN TOWNSHIP, BRIDGE
    13             REPLACEMENT                                 1,250,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $1,079,000)
    16             (LAND ALLOCATION - $10,000)
    17             (DESIGN AND CONTINGENCIES - $161,000)
    18         (2)  S.R.50014, DELVILLE ROAD BRIDGE OVER
    19             SHERMAN CREEK, PENN AND WHEATFIELD
    20             TOWNSHIPS, BRIDGE REPLACEMENT               1,272,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $1,099,000)
    23             (LAND ALLOCATION - $8,000)
    24             (DESIGN AND CONTINGENCIES - $165,000)
    25         (3)  S.R.3009, SHERMANS CREEK BRIDGE OVER
    26             SHERMANS CREEK, SOUTHWEST MADISON
    27             TOWNSHIP, BRIDGE REPLACEMENT                  730,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $610,000)
    30             (LAND ALLOCATION - $20,000)
    19910H1959B3288                 - 170 -

     1             (DESIGN AND CONTINGENCIES - $100,000)
     2  SECTION 55.  PHILADELPHIA COUNTY.
     3     (A)  LOCAL BRIDGES (RESERVED)
     4     (B)  STATE BRIDGES
     5         (1)  S.R.1002, ADAMS AVENUE BRIDGE OVER
     6             TACONY CREEK, CITY OF PHILADELPHIA,
     7             BRIDGE REHABILITATION                       1,200,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $850,000)
    10             (LAND ALLOCATION - $100,000)
    11             (DESIGN AND CONTINGENCIES - $250,000)
    12         (2)  S.R.4006, CITY AVENUE S.B. OVER
    13             SCHUYLKILL, CITY OF PHILADELPHIA,
    14             BRIDGE DECK REPLACEMENT                     7,950,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $7,500,000)
    17             (LAND ALLOCATION - $100,000)
    18             (DESIGN AND CONTINGENCIES - $350,000)
    19         (3)  S.R.0063, WOODHAVEN ROAD: U.S. 1 TO I-
    20             95, 6 BRIDGES, PHILADELPHIA AND
    21             BENSALEM TOWNSHIPS, BRIDGE DECK
    22             REHABILITATION                              3,500,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $3,325,000)
    25             (DESIGN AND CONTINGENCIES - $175,000)
    26  SECTION 56. PIKE COUNTY.
    27     (A)  LOCAL BRIDGES
    28         (1)  MILFORD BOROUGH AND DINGMAN TOWNSHIP,
    29             T-426, MOTT STREET BRIDGE NO.21 OVER
    30             SAWKILL CREEK, BRIDGE REPLACEMENT           1,550,000
    19910H1959B3288                 - 171 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $1,310,000)
     3             (LAND ALLOCATION - $40,000)
     4             (DESIGN AND CONTINGENCIES - $200,000)
     5         (2)  SHOHOLA TOWNSHIP, T-440, AUMULLER
     6             BRIDGE NO.24 OVER BALLIARD CREEK,
     7             BRIDGE REPLACEMENT                            210,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $165,000)
    10             (LAND ALLOCATION - $20,000)
    11             (DESIGN AND CONTINGENCIES - $25,000)
    12         (3)  PORTER TOWNSHIP, T-317, BRIDGE NO.5
    13             OVER BIG BUSHKILL CREEK, BRIDGE
    14             REPLACEMENT                                   450,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $370,000)
    17             (LAND ALLOCATION - $25,000)
    18             (DESIGN AND CONTINGENCIES - $55,000)
    19         (4)  PORTER TOWNSHIP, T-317, BRIDGE NO.4
    20             OVER SPRUCE RUN, BRIDGE REPLACEMENT           135,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $100,000)
    23             (LAND ALLOCATION - $20,000)
    24             (DESIGN AND CONTINGENCIES - $15,000)
    25         (5)  DINGMAN TOWNSHIP, T-424, BRIDGE NO.5
    26             RATTLESNAKE BRIDGE OVER RATTLESNAKE
    27             CREEK, BRIDGE REPLACEMENT                     210,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $165,000)
    30             (LAND ALLOCATION - $20,000)
    19910H1959B3288                 - 172 -

     1             (DESIGN AND CONTINGENCIES - $25,000)
     2     (B) STATE BRIDGES
     3         (1)  S.R.0006 BRIDGE OVER DELAWARE RIVER,
     4             MATAMORAS BOROUGH, BRIDGE REPLACEMENT         330,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $300,000)
     7             (DESIGN AND CONTINGENCIES - $30,000)
     8         (2)  S.R.0084 BRIDGE OVER DELAWARE RIVER,
     9             MATAMORAS BOROUGH, BRIDGE REPLACEMENT         700,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $600,000)
    12             (DESIGN AND CONTINGENCIES - $100,000)
    13         (3)  S.R.0402 BRIDGE OVER BLOOMING GROVE
    14             CREEK, BLOOMING GROVE TOWNSHIP, BRIDGE
    15             REPLACEMENT                                   460,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $400,000)
    18             (LAND ALLOCATION - $10,000)
    19             (DESIGN AND CONTINGENCIES - $50,000)
    20         (4)  S.R.2001 BRIDGE OVER TOMS CREEK,
    21             LEHMAN TOWNSHIP, BRIDGE REPLACEMENT           536,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $470,000)
    24             (LAND ALLOCATION - $10,000)
    25             (DESIGN AND CONTINGENCIES - $56,000)
    26         (5)  S.R.2001 BRIDGE OVER BRANCH OF
    27             VALENTINE BROOK, MILFORD BOROUGH,
    28             BRIDGE REPLACEMENT                            570,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $500,000)
    19910H1959B3288                 - 173 -

     1             (LAND ALLOCATION - $10,000)
     2             (DESIGN AND CONTINGENCIES - $60,000)
     3         (6)  S.R.0507 BRIDGE OVER TRIBUTARY TO
     4             WALLENPAUPACK CREEK, PALMYRA TOWNSHIP,
     5             BRIDGE REPLACEMENT                            460,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $400,000)
     8             (LAND ALLOCATION - $10,000)
     9             (DESIGN AND CONTINGENCIES - $50,000)
    10         (7)  S.R.0209 BRIDGE OVER SAWSKILL CREEK,
    11             MILFORD BOROUGH, BRIDGE REPLACEMENT         2,280,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $2,020,000)
    14             (LAND ALLOCATION - $20,000)
    15             (DESIGN AND CONTINGENCIES - $240,000)
    16  SECTION 57.  POTTER COUNTY.
    17     (A)  LOCAL BRIDGES (RESERVED)
    18     (B)  STATE BRIDGES
    19         (1)  S.R.0044, KETTLE CREEK BRIDGE OVER
    20             KETTLE CREEK, STEWARDSON TOWNSHIP,
    21             BRIDGE REPLACEMENT                          1,150,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $900,000)
    24             (LAND ALLOCATION - $100,000)
    25             (DESIGN AND CONTINGENCIES - $150,000)
    26         (2)  S.R.0044 BRIDGE OVER KETTLE CREEK,
    27             STEWARDSON TOWNSHIP, BRIDGE
    28             REPLACEMENT                                 1,150,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $900,000)
    19910H1959B3288                 - 174 -

     1             (LAND ALLOCATION - $100,000)
     2             (DESIGN AND CONTINGENCIES - $150,000)
     3         (3)  S.R.0006 BRIDGE OVER ALLEGHENY RIVER,
     4             COUDERSPORT BOROUGH, BRIDGE
     5             REPLACEMENT                                 1,500,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $1,250,000)
     8             (LAND ALLOCATION - $100,000)
     9             (DESIGN AND CONTINGENCIES - $150,000)
    10         (4)  S.R.0044 BRIDGE OVER SHARON CREEK,
    11             SHARON TOWNSHIP, BRIDGE REPLACEMENT           800,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $600,000)
    14             (LAND ALLOCATION - $100,000)
    15             (DESIGN AND CONTINGENCIES - $100,000)
    16         (5)  S.R.0244 BRIDGE OVER ELLISBURG CREEK,
    17             GENESEE TOWNSHIP, BRIDGE REPLACEMENT          650,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $450,000)
    20             (LAND ALLOCATION - $100,000)
    21             (DESIGN AND CONTINGENCIES - $100,000)
    22         (6)  S.R.1010 BRIDGE OVER GENESEE RIVER,
    23             GENESEE TOWNSHIP, BRIDGE REPLACEMENT        1,600,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $1,250,000)
    26             (LAND ALLOCATION - $150,000)
    27             (DESIGN AND CONTINGENCIES - $200,000)
    28         (7)  S.R.1011, BRIDGE NO.2 OVER GENESEE
    29             RIVER, GENESEE TOWNSHIP, BRIDGE
    30             REPLACEMENT                                   850,000
    19910H1959B3288                 - 175 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $650,000)
     3             (LAND ALLOCATION - $100,000)
     4             (DESIGN AND CONTINGENCIES - $100,000)
     5         (8)  S.R.1020 BRIDGE OVER WEST BRANCH OF
     6             PINE CREEK, GALETON BOROUGH, BRIDGE
     7             REPLACEMENT                                 1,525,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $1,250,000)
    10             (LAND ALLOCATION - $100,000)
    11             (DESIGN AND CONTINGENCIES - $175,000)
    12         (9)  S.R.1024 BRIDGE OVER PINE CREEK,
    13             ULYSSES TOWNSHIP, BRIDGE REPLACEMENT          450,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $250,000)
    16             (LAND ALLOCATION - $100,000)
    17             (DESIGN AND CONTINGENCIES - $100,000)
    18         (10)  S.R.1024 BRIDGE OVER GENESEE FORK OF
    19             PINE CREEK, ULYSSES TOWNSHIP, BRIDGE
    20             REPLACEMENT                                 1,300,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $1,000,000)
    23             (LAND ALLOCATION - $150,000)
    24             (DESIGN AND CONTINGENCIES - $150,000)
    25         (11)  S.R.4003 BRIDGE OVER FISHING CREEK,
    26             ROULETTE TOWNSHIP, BRIDGE REPLACEMENT         950,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $750,000)
    29             (LAND ALLOCATION - $100,000)
    30             (DESIGN AND CONTINGENCIES - $100,000)
    19910H1959B3288                 - 176 -

     1  SECTION 58. SCHUYLKILL COUNTY.
     2     (A)  LOCAL BRIDGES
     3         (1)  NORTH UNION TOWNSHIP, T-455 OVER
     4             TOMHICKEN CREEK, BRIDGE REPLACEMENT           178,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $138,000)
     7             (LAND ALLOCATION - $10,000)
     8             (DESIGN AND CONTINGENCIES - $30,000)
     9         (2)  UNION TOWNSHIP, T-794 OVER LITTLE
    10             CATAWISSA CREEK, BRIDGE REPLACEMENT           180,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $140,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $30,000)
    15         (3)  BRANCH TOWNSHIP, T-564, DIAMOND STREET
    16             OVER WEST CREEK, BRIDGE REPLACEMENT           190,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $150,000)
    19             (LAND ALLOCATION - $10,000)
    20             (DESIGN AND CONTINGENCIES - $30,000)
    21         (4)  EAST BRUNSWICK TOWNSHIP, T-757 OVER
    22             INDIAN RUN, BRIDGE REPLACEMENT                155,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $115,000)
    25             (LAND ALLOCATION - $10,000)
    26             (DESIGN AND CONTINGENCIES - $30,000)
    27         (5)  HEGINS TOWNSHIP, T-388, WOOD LANE
    28             BRIDGE OVER DEEP CREEK, BRIDGE
    29             REPLACEMENT                                   220,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19910H1959B3288                 - 177 -

     1             $175,000)
     2             (LAND ALLOCATION - $10,000)
     3             (DESIGN AND CONTINGENCIES - $35,000)
     4         (6)  BARRY TOWNSHIP, T-577, COUNTY BRIDGE
     5             NO.7 OVER DEEP CREEK, BRIDGE
     6             REPLACEMENT                                   155,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $115,000)
     9             (LAND ALLOCATION - $10,000)
    10             (DESIGN AND CONTINGENCIES - $30,000)
    11         (7)  PORTER TOWNSHIP, T-418, COUNTY BRIDGE
    12             NO.67 OVER WISCONISCO CREEK, BRIDGE
    13             REPLACEMENT                                   235,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $180,000)
    16             (LAND ALLOCATION - $15,000)
    17             (DESIGN AND CONTINGENCIES - $40,000)
    18         (8)  PINE GROVE TOWNSHIP, T-406, COUNTY
    19             BRIDGE NO.108 OVER LITTLE SWATARA
    20             CREEK, BRIDGE REPLACEMENT                     395,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $325,000)
    23             (LAND ALLOCATION - $20,000)
    24             (DESIGN AND CONTINGENCIES - $50,000)
    25         (9)  WEST BRUNSWICK TOWNSHIP, T-723,
    26             INDUSTRIAL PARK ROAD BRIDGE OVER PINE
    27             CREEK, BRIDGE REPLACEMENT                     420,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $350,000)
    30             (LAND ALLOCATION - $20,000)
    19910H1959B3288                 - 178 -

     1             (DESIGN AND CONTINGENCIES - $50,000)
     2         (10)  HEGINS TOWNSHIP, T-474, GAP SCHOOL
     3             ROAD BRIDGE OVER RAUSCH CREEK, BRIDGE
     4             REPLACEMENT                                   150,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $110,000)
     7             (LAND ALLOCATION - $10,000)
     8             (DESIGN AND CONTINGENCIES - $30,000)
     9         (11)  HEGINS TOWNSHIP, T-474, GAP SCHOOL
    10             ROAD BRIDGE OVER PINE CREEK, BRIDGE
    11             REPLACEMENT                                   185,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $145,000)
    14             (LAND ALLOCATION - $10,000)
    15             (DESIGN AND CONTINGENCIES - $30,000)
    16         (12)  HUBLEY TOWNSHIP, T-446, COUNTY BRIDGE
    17             NO.71 OVER DEEP CREEK, BRIDGE
    18             REPLACEMENT                                   400,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $330,000)
    21             (LAND ALLOCATION - $20,000)
    22             (DESIGN AND CONTINGENCIES - $50,000)
    23         (13)  GIRARDVILLE BOROUGH, JOHN STREET
    24             BRIDGE OVER MAHANOY CREEK, BRIDGE
    25             REPLACEMENT                                   245,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $200,000)
    28             (LAND ALLOCATION - $10,000)
    29             (DESIGN AND CONTINGENCIES - $35,000)
    30         (14)  ST. CLAIR BOROUGH, SHERMAN STREET
    19910H1959B3288                 - 179 -

     1             COUNTY BRIDGE NO.48 OVER MILL CREEK,
     2             BRIDGE REPLACEMENT                            300,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $240,000)
     5             (LAND ALLOCATION - $20,000)
     6             (DESIGN AND CONTINGENCIES - $40,000)
     7         (15)  PINE GROVE BOROUGH, MILL STREET
     8             COUNTY BRIDGE NO.33 OVER SWATARA CREEK,
     9             BRIDGE REPLACEMENT                            725,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $630,000)
    12             (LAND ALLOCATION - $20,000)
    13             (DESIGN AND CONTINGENCIES - $75,000)
    14         (16)  ST. CLAIR BOROUGH, RUSSELL STREET
    15             BRIDGE OVER MILL CREEK, BRIDGE
    16             REPLACEMENT                                   260,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $200,000)
    19             (LAND ALLOCATION - $20,000)
    20             (DESIGN AND CONTINGENCIES - $40,000)
    21         (17)  GILBERTON BOROUGH, RAILROAD STREET
    22             BRIDGE OVER MAHANOY CREEK, BRIDGE
    23             REPLACEMENT                                   190,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $150,000)
    26             (LAND ALLOCATION - $10,000)
    27             (DESIGN AND CONTINGENCIES - $30,000)
    28         (18)  GILBERTON BOROUGH, BRIDGE STREET
    29             COUNTY BRIDGE NO.78 OVER MAHANOY CREEK,
    30             BRIDGE REPLACEMENT                            245,000
    19910H1959B3288                 - 180 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $200,000)
     3             (LAND ALLOCATION - $10,000)
     4             (DESIGN AND CONTINGENCIES - $35,000)
     5         (19)  LANDINGVILLE BOROUGH, CANAL STREET
     6             BRIDGE OVER SCHUYLKILL RIVER, BRIDGE
     7             REPLACEMENT                                   740,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $640,000)
    10             (LAND ALLOCATION - $20,000)
    11             (DESIGN AND CONTINGENCIES - $80,000)
    12         (20)  BLYTHE TOWNSHIP, T-770, RIDGE STREET
    13             BRIDGE OVER SCHUYLKILL RIVER, BRIDGE
    14             REPLACEMENT                                   450,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $380,000)
    17             (LAND ALLOCATION - $20,000)
    18             (DESIGN AND CONTINGENCIES - $50,000)
    19         (21)  NORTH MANHEIM TOWNSHIP, T-686,
    20             MEMORIAL DRIVE UNDER ABANDONED RAILROAD
    21             LINE, BRIDGE REMOVAL                          295,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $250,000)
    24             (LAND ALLOCATION - $20,000)
    25             (DESIGN AND CONTINGENCIES - $25,000)
    26         (22)  FRACKVILLE BOROUGH, SPRING STREET
    27             OVERPASS, UNDER READING RAILROAD,
    28             BRIDGE REMOVAL                                 72,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $52,000)
    19910H1959B3288                 - 181 -

     1             (LAND ALLOCATION - $10,000)
     2             (DESIGN AND CONTINGENCIES - $10,000)
     3         (23)  HEGINS TOWNSHIP, T-478, BRIDGE OVER
     4             PINE CREEK, BRIDGE REPLACEMENT                148,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $129,000)
     7             (LAND ALLOCATION - $6,000)
     8             (DESIGN AND CONTINGENCIES - $13,000)
     9     (B)  STATE BRIDGES
    10         (1)  S.R.0309 CENTER STREET OVER LITTLE
    11             SCHUYLKILL RIVER, TAMAQUA BOROUGH,
    12             BRIDGE REPLACEMENT                          1,253,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $963,000)
    15             (LAND ALLOCATION - $193,000)
    16             (DESIGN AND CONTINGENCIES - $97,000)
    17         (2)  S.R.0061 OVER SCHUYLKILL RIVER, CITY
    18             OF POTTSVILLE, BRIDGE REPLACEMENT             329,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $299,000)
    21             (DESIGN AND CONTINGENCIES - $30,000)
    22         (3)  S.R.0061 OVER RAILROAD NEAR CITY OF
    23             POTTSVILLE, BRIDGE REPLACEMENT              1,323,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $1,202,000)
    26             (DESIGN AND CONTINGENCIES - $121,000)
    27         (4)  S.R.0895 OVER BEAR CREEK, WAYNE
    28             TOWNSHIP, BRIDGE REPLACEMENT                  169,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $130,000)
    19910H1959B3288                 - 182 -

     1             (LAND ALLOCATION - $26,000)
     2             (DESIGN AND CONTINGENCIES - $13,000)
     3         (5)  S.R.4042 OVER WEST BRANCH OF
     4             SCHUYLKILL RIVER, MINERSVILLE BOROUGH,
     5             BRIDGE REPLACEMENT                            468,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $360,000)
     8             (LAND ALLOCATION - $72,000)
     9             (DESIGN AND CONTINGENCIES - $36,000)
    10         (6)  S.R.4002 OVER WEST BRANCH OF
    11             SCHUYLKILL RIVER, CASS TOWNSHIP, BRIDGE
    12             REPLACEMENT                                   296,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $269,000)
    15             (DESIGN AND CONTINGENCIES - $27,000)
    16         (7)  S.R.0501 OVER BRANCH OF LITTLE SWATARA
    17             CREEK, PINE GROVE TOWNSHIP, BRIDGE
    18             REPLACEMENT                                   130,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $100,000)
    21             (LAND ALLOCATION - $20,000)
    22             (DESIGN AND CONTINGENCIES - $10,000)
    23         (8)  S.R.1002 POTTSVILLE STREET OVER MILL
    24             CREEK, PORT CARBON BOROUGH, BRIDGE
    25             REPLACEMENT                                   603,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $548,000)
    28             (DESIGN AND CONTINGENCIES - $55,000)
    29         (9)  S.R.0209 OVER A MINE SHAFT NEAR
    30             MECHANICSVILLE BOROUGH, PORT CARBON
    19910H1959B3288                 - 183 -

     1             BOROUGH, BRIDGE REPLACEMENT                    48,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $40,000)
     4             (DESIGN AND CONTINGENCIES - $8,000)
     5         (10)  S.R.0924 OVERPASS UNDER READING
     6             RAILROAD, FRACKVILLE BOROUGH, BRIDGE
     7             REMOVAL                                       120,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $100,000)
    10             (LAND ALLOCATION - $10,000)
    11             (DESIGN AND CONTINGENCIES - $10,000)
    12         (11)  S.R.2006 OVER MAHANNON CREEK, WEST
    13             BRUNSWICK TOWNSHIP, BRIDGE REMOVAL            107,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $92,000)
    16             (LAND ALLOCATION - $5,000)
    17             (DESIGN AND CONTINGENCIES - $10,000)
    18  SECTION 59.  SNYDER COUNTY.
    19     (A)  LOCAL BRIDGES (RESERVED)
    20     (B)  STATE BRIDGES
    21         (1)  S.R.1017 BRIDGE OVER ROLLING GREEN
    22             RUN, MONROE TOWNSHIP, BRIDGE
    23             REPLACEMENT                                   395,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $316,000)
    26             (LAND ALLOCATION - $20,000)
    27             (DESIGN AND CONTINGENCIES - $59,000)
    28  SECTION 60.  SOMERSET COUNTY.
    29     (A)  LOCAL BRIDGES
    30         (1)  ELK LICK TOWNSHIP, MOSER BRIDGE,
    19910H1959B3288                 - 184 -

     1             BRIDGE REPLACEMENT                            759,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $694,000)
     4             (LAND ALLOCATION - $5,000)
     5             (DESIGN AND CONTINGENCIES - $60,000)
     6         (2)  ALLEGHENY TOWNSHIP, BRUSH CREEK
     7             BRIDGE, BRIDGE REPLACEMENT                    306,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $268,000)
    10             (LAND ALLOCATION - $5,000)
    11             (DESIGN AND CONTINGENCIES - $33,000)
    12         (3)  ELK LICK TOWNSHIP, MAUST BRIDGE,
    13             BRIDGE REPLACEMENT                            866,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $794,000)
    16             (LAND ALLOCATION - $5,000)
    17             (DESIGN AND CONTINGENCIES - $67,000)
    18         (4)  FAIRHOPE TOWNSHIP, PACK SADDLE BRIDGE,
    19             BRIDGE REPLACEMENT                            228,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $200,000)
    22             (LAND ALLOCATION - $5,000)
    23             (DESIGN AND CONTINGENCIES - $23,000)
    24         (5)  SOUTHAMPTON TOWNSHIP, EMERICK BRIDGE,
    25             BRIDGE REPLACEMENT                            265,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $230,000)
    28             (LAND ALLOCATION - $5,000)
    29             (DESIGN AND CONTINGENCIES - $30,000)
    30         (6)  STONYCREEK TOWNSHIP, BRADY BRIDGE,
    19910H1959B3288                 - 185 -

     1             BRIDGE REPLACEMENT                            601,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $546,000)
     4             (LAND ALLOCATION - $5,000)
     5             (DESIGN AND CONTINGENCIES - $50,000)
     6         (7)  NORTHAMPTON TOWNSHIP, PHILSON BRIDGE,
     7             BRIDGE REPLACEMENT                            367,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $325,000)
    10             (LAND ALLOCATION - $5,000)
    11             (DESIGN AND CONTINGENCIES - $37,000)
    12         (8)  SOMERSET TOWNSHIP, HOUSEFELDT BRIDGE,
    13             BRIDGE REPLACEMENT                            366,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $325,000)
    16             (LAND ALLOCATION - $5,000)
    17             (DESIGN AND CONTINGENCIES - $36,000)
    18     (B)  STATE BRIDGES
    19         (1)  S.R.0219, MILLER RUN BRIDGE NO.2,
    20             BROTHERS VALLEY TOWNSHIP, BRIDGE
    21             REPLACEMENT                                   560,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $465,000)
    24             (LAND ALLOCATION - $25,000)
    25             (DESIGN AND CONTINGENCIES - $70,000)
    26         (2)  S.R.2005, INTERSECTION BRIDGE OVER ELK
    27             LICK CREEK, SOMERSET TOWNSHIP, BRIDGE
    28             REPLACEMENT                                   558,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $442,000)
    19910H1959B3288                 - 186 -

     1             (LAND ALLOCATION - $50,000)
     2             (DESIGN AND CONTINGENCIES - $66,000)
     3         (3)  S.R.1004, EAST SHANKSVILLE BRIDGE OVER
     4             RHOADES CREEK, SHANKSVILLE BOROUGH,
     5             BRIDGE REPLACEMENT                            992,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $789,000)
     8             (LAND ALLOCATION - $100,000)
     9             (DESIGN AND CONTINGENCIES - $103,000)
    10         (4)  S.R.0281, SOUTHWEST SOMERSET BRIDGE
    11             OVER WEST BRANCH COXES CREEK, SOMERSET
    12             TOWNSHIP, BRIDGE REPLACEMENT                  678,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $556,000)
    15             (LAND ALLOCATION - $50,000)
    16             (DESIGN AND CONTINGENCIES - $72,000)
    17         (5)  S.R.0031, EAST BROTHERTON BRIDGE OVER
    18             SANDY HALLOW CREEK, STONEYCREEK
    19             TOWNSHIP, BRIDGE REPLACEMENT                  535,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $445,000)
    22             (LAND ALLOCATION - $25,000)
    23             (DESIGN AND CONTINGENCIES - $65,000)
    24         (6)  S.R.0219, MILLER RUN BRIDGE NO.1,
    25             BROTHERS VALLEY TOWNSHIP, BRIDGE
    26             REPLACEMENT                                   560,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $465,000)
    29             (LAND ALLOCATION - $25,000)
    30             (DESIGN AND CONTINGENCIES - $70,000)
    19910H1959B3288                 - 187 -

     1         (7)  S.R.0031, KIMBERLY RUN BRIDGE,
     2             SOMERSET TOWNSHIP, BRIDGE REPLACEMENT         525,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $435,000)
     5             (LAND ALLOCATION - $25,000)
     6             (DESIGN AND CONTINGENCIES - $65,000)
     7         (8)  S.R.2021, BURKHART BRIDGE OVER
     8             SHAFFERS RUN, FAIRHOPE TOWNSHIP, BRIDGE
     9             REPLACEMENT                                   675,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $553,000)
    12             (LAND ALLOCATION - $50,000)
    13             (DESIGN AND CONTINGENCIES - $72,000)
    14         (9)  S.R.2021, MIDWAY BRIDGE OVER SHAFFERS
    15             RUN, FAIRHOPE TOWNSHIP, BRIDGE
    16             REPLACEMENT                                   560,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $444,000)
    19             (LAND ALLOCATION - $50,000)
    20             (DESIGN AND CONTINGENCIES - $66,000)
    21         (10)  S.R.4041, KRINGS BRIDGE OVER
    22             STONYCREEK RIVER, CONEMAUGH TOWNSHIP,
    23             BRIDGE REPLACEMENT                          2,496,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $2,087,000)
    26             (LAND ALLOCATION - $200,000)
    27             (DESIGN AND CONTINGENCIES - $209,000)
    28  SECTION 61.  SULLIVAN COUNTY (RESERVED).
    29  SECTION 62.  SUSQUEHANNA COUNTY.
    30     (A)  LOCAL BRIDGES (RESERVED)
    19910H1959B3288                 - 188 -

     1     (B)  STATE BRIDGES
     2         (1)  S.R.0374 OVER TUNKHANNOCK CREEK,
     3             CLIFFORD TOWNSHIP, BRIDGE REPLACEMENT         350,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $300,000)
     6             (LAND ALLOCATION - $10,000)
     7             (DESIGN AND CONTINGENCIES - $40,000)
     8         (2)  S.R.2021 OVER TUNKHANNOCK CREEK,
     9             LENOXVILLE BOROUGH, BRIDGE REPLACEMENT        800,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $700,000)
    12             (LAND ALLOCATION - $10,000)
    13             (DESIGN AND CONTINGENCIES - $90,000)
    14         (3)  S.R.2021 OVER TUNKHANNOCK CREEK, LENOX
    15             TOWNSHIP, BRIDGE REPLACEMENT                1,470,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $1,300,000)
    18             (LAND ALLOCATION - $10,000)
    19             (DESIGN AND CONTINGENCIES - $160,000)
    20         (4)  S.R.0267 OVER EAST BRANCH OF WYALUSING
    21             CREEK, RUSH TOWNSHIP, BRIDGE
    22             REPLACEMENT                                 1,250,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $1,107,000)
    25             (LAND ALLOCATION - $10,000)
    26             (DESIGN AND CONTINGENCIES - $133,000)
    27         (5)  S.R.0106 OVER EAST BRANCH OF
    28             TUNKHANNOCK CREEK, CLIFFORD TOWNSHIP,
    29             BRIDGE REPLACEMENT                          1,018,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19910H1959B3288                 - 189 -

     1             $900,000)
     2             (LAND ALLOCATION - $10,000)
     3             (DESIGN AND CONTINGENCIES - $108,000)
     4         (6)  S.R.0171 OVER EAST BRANCH OF
     5             LACKAWANNA RIVER, CLIFFORD TOWNSHIP,
     6             BRIDGE REPLACEMENT                          2,938,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $2,605,000)
     9             (LAND ALLOCATION - $20,000)
    10             (DESIGN AND CONTINGENCIES - $313,000)
    11         (7)  S.R.0106 OVER EAST BRANCH OF
    12             TUNKHANNOCK CREEK, CLIFFORD TOWNSHIP,
    13             BRIDGE REPLACEMENT                          1,870,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $1,660,000)
    16             (LAND ALLOCATION - $10,000)
    17             (DESIGN AND CONTINGENCIES - $200,000)
    18         (8)  S.R.0374 OVER TUNKHANNOCK CREEK, LENOX
    19             TOWNSHIP, BRIDGE REPLACEMENT                  370,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $320,000)
    22             (LAND ALLOCATION - $10,000)
    23             (DESIGN AND CONTINGENCIES - $40,000)
    24         (9)  S.R.3029 OVER EAST BRANCH OF WYALUSING
    25             CREEK, JESSUP TOWNSHIP, BRIDGE
    26             REPLACEMENT                                   794,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $700,000)
    29             (LAND ALLOCATION - $10,000)
    30             (DESIGN AND CONTINGENCIES - $84,000)
    19910H1959B3288                 - 190 -

     1         (10)  S.R.1010 OVER LEWIS CREEK, OAKLAND
     2             TOWNSHIP, BRIDGE REPLACEMENT                  486,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $425,000)
     5             (LAND ALLOCATION - $10,000)
     6             (DESIGN AND CONTINGENCIES - $51,000)
     7         (11)  S.R.0858 OVER APOLACON CREEK, LITTLE
     8             MEADOWS BOROUGH, BRIDGE REPLACEMENT         1,197,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $1,060,000)
    11             (LAND ALLOCATION - $10,000)
    12             (DESIGN AND CONTINGENCIES - $127,000)
    13         (12)  S.R.0848 OVER BRANCH OF BUTLER CREEK,
    14             GIBSON TOWNSHIP, BRIDGE REPLACEMENT           532,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $466,000)
    17             (LAND ALLOCATION - $10,000)
    18             (DESIGN AND CONTINGENCIES - $56,000)
    19         (13)  S.R.2050 OVER NORTH BRANCH OF
    20             TUNKHANNOCK CREEK, CLIFFORD TOWNSHIP,
    21             BRIDGE REPLACEMENT                            553,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $485,000)
    24             (LAND ALLOCATION - $10,000)
    25             (DESIGN AND CONTINGENCIES - $58,000)
    26         (14)  S.R.2061 OVER MEYLERT CREEK, NEW
    27             MILFORD TOWNSHIP, BRIDGE REPLACEMENT          380,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $330,000)
    30             (LAND ALLOCATION - $10,000)
    19910H1959B3288                 - 191 -

     1             (DESIGN AND CONTINGENCIES - $40,000)
     2         (15)  S.R.3012 OVER WEST BRANCH OF
     3             MESHOPPEN CREEK, SPRINGVILLE TOWNSHIP,
     4             BRIDGE REPLACEMENT                            676,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $595,000)
     7             (LAND ALLOCATION - $10,000)
     8             (DESIGN AND CONTINGENCIES - $71,000)
     9         (16)  S.R.2096 OVER HORTON CREEK, LATHROP
    10             TOWNSHIP, BRIDGE REPLACEMENT                  458,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $400,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $48,000)
    15         (17)  S.R.0267 OVER BRANCH OF CHOCONUT
    16             CREEK, CHOCONUT TOWNSHIP, BRIDGE
    17             REPLACEMENT                                   794,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $700,000)
    20             (LAND ALLOCATION - $10,000)
    21             (DESIGN AND CONTINGENCIES - $84,000)
    22  SECTION 63.  TIOGA COUNTY (RESERVED).
    23  SECTION 64.  UNION COUNTY.
    24     (A)  LOCAL BRIDGES
    25         (1)  WEST BUFFALO TOWNSHIP, T-380, SCHOOL
    26             HOUSE BRIDGE OVER BUFFALO CREEK, BRIDGE
    27             REPLACEMENT                                   779,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $623,000)
    30             (LAND ALLOCATION - $39,000)
    19910H1959B3288                 - 192 -

     1             (DESIGN AND CONTINGENCIES - $117,000)
     2         2)  KELLY TOWNSHIP, T-450, COUNTY BRIDGE
     3             NO.8, NOGLE BRIDGE OVER BUFFALO CREEK,
     4             BRIDGE REPLACEMENT                          1,026,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $821,000)
     7             (LAND ALLOCATION - $51,000)
     8             (DESIGN AND CONTINGENCIES - $154,000)
     9         (3)  MIFFLINBURG BOROUGH, COUNTY BRIDGE
    10             NO.14, IDDINGS BRIDGE OVER BUFFALO
    11             CREEK, BRIDGE REPLACEMENT                     493,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $394,000)
    14             (LAND ALLOCATION - $25,000)
    15             (DESIGN AND CONTINGENCIES - $74,000)
    16         (4)  HARTLEY TOWNSHIP, TRAILS END BRIDGE
    17             OVER PENNS CREEK, BRIDGE REPLACEMENT        1,120,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $896,000)
    20             (LAND ALLOCATION - $56,000)
    21             (DESIGN AND CONTINGENCIES - $168,000)
    22         (5)  WHITE DEER TOWNSHIP, BOWERSOX BRIDGE
    23             OVER SPRUCE RUN, BRIDGE REPLACEMENT           300,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $240,000)
    26             (LAND ALLOCATION - $15,000)
    27             (DESIGN AND CONTINGENCIES - $45,000)
    28         (6)  LIMESTONE TOWNSHIP, DEER BRIDGE OVER
    29             SWEITZER RUN, BRIDGE REPLACEMENT              350,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19910H1959B3288                 - 193 -

     1             $280,000)
     2             (LAND ALLOCATION - $15,000)
     3             (DESIGN AND CONTINGENCIES - $55,000)
     4     (B)  STATE BRIDGES (RESERVED)
     5  SECTION 65. VENANGO COUNTY.
     6     (A)  LOCAL BRIDGES
     7         (1)  CHERRY TREE TOWNSHIP, T-520 OVER
     8             PRATHER CREEK, BRIDGE REPLACEMENT             120,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $96,000)
    11             (LAND ALLOCATION - $12,000)
    12             (DESIGN AND CONTINGENCIES - $12,000)
    13         (2)  OIL CREEK TOWNSHIP, T-639 ON COE ROAD
    14             OVER PITHOLE CREEK, BRIDGE REPLACEMENT        112,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $90,000)
    17             (LAND ALLOCATION - $11,000)
    18             (DESIGN AND CONTINGENCIES - $11,000)
    19         (3)  OAKLAND TOWNSHIP, T-450 OVER TWO MULE
    20             RUN TRIBUTARY, BRIDGE REPLACEMENT             154,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $124,000)
    23             (LAND ALLOCATION - $15,000)
    24             (DESIGN AND CONTINGENCIES - $15,000)
    25         (4)  CHERRY TREE TOWNSHIP, T-649 OVER
    26             PRATHER CREEK, BRIDGE REPLACEMENT             120,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $96,000)
    29             (LAND ALLOCATION - $12,000)
    30             (DESIGN AND CONTINGENCIES - $12,000)
    19910H1959B3288                 - 194 -

     1         (5)  ROCKLAND TOWNSHIP, T-512, SLAB FURNACE
     2             RAILROAD OVER CONRAIL RAILROAD, BRIDGE
     3             REPLACEMENT                                   442,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $384,000)
     6             (LAND ALLOCATION - $10,000)
     7             (DESIGN AND CONTINGENCIES - $48,000)
     8         (6)  ROCKLAND TOWNSHIP, T-582, CONRAIL
     9             BRIDGE T-582 OVER CONRAIL RAILROAD,
    10             BRIDGE REPLACEMENT                            385,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $345,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $30,000)
    15     (B)  STATE BRIDGES
    16         (1)  S.R.3007, WITHERUP BRIDGE OVER
    17             SCRUBGRASS CREEK, CLINTON TOWNSHIP,
    18             BRIDGE REPLACEMENT                            850,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $665,000)
    21             (LAND ALLOCATION - $60,000)
    22             (DESIGN AND CONTINGENCIES - $125,000)
    23         (2)  S.R.0036 ON COL. DRAKE HIGHWAY OVER
    24             PITHOLE CREEK, ALLEGHENY TOWNSHIP,
    25             BRIDGE REPLACEMENT                            900,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $765,000)
    28             (LAND ALLOCATION - $45,000)
    29             (DESIGN AND CONTINGENCIES - $90,000)
    30  SECTION 66. WARREN COUNTY.
    19910H1959B3288                 - 195 -

     1     (A)  LOCAL BRIDGES
     2         (1)  PITTSFIELD TOWNSHIP, T-435 OVER
     3             ANDREWS RUN, BRIDGE REPLACEMENT               192,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $154,000)
     6             (LAND ALLOCATION - $19,000)
     7             (DESIGN AND CONTINGENCIES - $19,000)
     8         (2)  FREEHOLD TOWNSHIP, T-549 OVER STONEY
     9             CREEK, BRIDGE REPLACEMENT                     110,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $88,000)
    12             (LAND ALLOCATION - $11,000)
    13             (DESIGN AND CONTINGENCIES - $11,000)
    14         (3)  SHEFFIELD TOWNSHIP, T-540 OVER TWO
    15             MILE RUN, BRIDGE REPLACEMENT                  318,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $254,000)
    18             (LAND ALLOCATION - $32,000)
    19             (DESIGN AND CONTINGENCIES - $32,000)
    20         (4)  SOUTHWEST TOWNSHIP, T-306 ON MT. HOPE
    21             ROAD OVER PINE CREEK, BRIDGE
    22             REPLACEMENT                                   207,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $165,000)
    25             (LAND ALLOCATION - $21,000)
    26             (DESIGN AND CONTINGENCIES - $21,000)
    27         (5)  SPRING CREEK TOWNSHIP, T-322 OVER EAST
    28             BRANCH OF SPRING CREEK, BRIDGE
    29             REPLACEMENT                                   207,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19910H1959B3288                 - 196 -

     1             $165,000)
     2             (LAND ALLOCATION - $21,000)
     3             (DESIGN AND CONTINGENCIES - $21,000)
     4         (6)  SOUTHWEST TOWNSHIP, T-313 ON SWEDE
     5             ROAD OVER PINE CREEK, BRIDGE
     6             REPLACEMENT                                   109,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $87,000)
     9             (LAND ALLOCATION - $11,000)
    10             (DESIGN AND CONTINGENCIES - $11,000)
    11         (7)  SHEFFIELD TOWNSHIP, T-311 OVER
    12             CALDWELL CREEK, BRIDGE REPLACEMENT            210,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $168,000)
    15             (LAND ALLOCATION - $21,000)
    16             (DESIGN AND CONTINGENCIES - $21,000)
    17         (8)  SOUTHWEST TOWNSHIP, T-309 OVER PINE
    18             CREEK, BRIDGE REPLACEMENT                     124,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $100,000)
    21             (LAND ALLOCATION - $12,000)
    22             (DESIGN AND CONTINGENCIES - $12,000)
    23         (9)  SPRING CREEK TOWNSHIP, T-395 OVER
    24             HOSMER RUN, BRIDGE REPLACEMENT                207,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $165,000)
    27             (LAND ALLOCATION - $21,000)
    28             (DESIGN AND CONTINGENCIES - $21,000)
    29         (10)  COLUMBUS TOWNSHIP, T-340 ON LACY ROAD
    30             OVER HARE CREEK, BRIDGE REPLACEMENT           166,000
    19910H1959B3288                 - 197 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $132,000)
     3             (LAND ALLOCATION - $17,000)
     4             (DESIGN AND CONTINGENCIES - $17,000)
     5         (11)  COLUMBUS TOWNSHIP, T-350 ON
     6             ALTERBOTTOM OVER TAMAROCK SWAMP
     7             TRIBUTARY, BRIDGE REPLACEMENT                  84,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $68,000)
    10             (LAND ALLOCATION - $8,000)
    11             (DESIGN AND CONTINGENCIES - $8,000)
    12         (12)  SPRING CREEK TOWNSHIP, T-425 OVER
    13             SPRING CREEK, BRIDGE REPLACEMENT              161,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $129,000)
    16             (LAND ALLOCATION - $16,000)
    17             (DESIGN AND CONTINGENCIES - $16,000)
    18         (13)  BROKENSTRAW TOWNSHIP, T-444 ON IRVINE
    19             RUN ROAD OVER IRVINE RUN, BRIDGE
    20             REPLACEMENT                                   110,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $88,000)
    23             (LAND ALLOCATION - $11,000)
    24             (DESIGN AND CONTINGENCIES - $11,000)
    25         (14)  ELDRED TOWNSHIP, T-355 ON GLOSSVILLE
    26             ROAD OVER CALDWELL CREEK, BRIDGE
    27             REPLACEMENT                                   119,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $95,000)
    30             (LAND ALLOCATION - $12,000)
    19910H1959B3288                 - 198 -

     1             (DESIGN AND CONTINGENCIES - $12,000)
     2         (15)  ELDRED TOWNSHIP, T-355 ON EUREKA ROAD
     3             OVER CALDWELL CREEK, BRIDGE
     4             REPLACEMENT                                   151,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $121,000)
     7             (LAND ALLOCATION - $15,000)
     8             (DESIGN AND CONTINGENCIES - $15,000)
     9         (16)  COLUMBIA TOWNSHIP, T-639 ON STEWART
    10             ROAD OVER WINTON RUN, BRIDGE
    11             REPLACEMENT                                   144,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $116,000)
    14             (LAND ALLOCATION - $14,000)
    15             (DESIGN AND CONTINGENCIES - $14,000)
    16         (17)  FREEHOLD TOWNSHIP, T-406 ON HUNTLEY
    17             ROAD OVER MILL CREEK, BRIDGE
    18             REPLACEMENT                                   157,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $125,000)
    21             (LAND ALLOCATION - $16,000)
    22             (DESIGN AND CONTINGENCIES - $16,000)
    23         (18)  SUGAR GROVE TOWNSHIP, T-539 OVER
    24             STEELWATER CREEK, BRIDGE REPLACEMENT          122,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $98,000)
    27             (LAND ALLOCATION - $12,000)
    28             (DESIGN AND CONTINGENCIES - $12,000)
    29         (19)  SUGAR GROVE TOWNSHIP, T-587 ON CREEK
    30             ROAD OVER SONDERS RUN, BRIDGE
    19910H1959B3288                 - 199 -

     1             REPLACEMENT                                   122,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $98,000)
     4             (LAND ALLOCATION - $12,000)
     5             (DESIGN AND CONTINGENCIES - $12,000)
     6         (20)  TIDIOUTE BOROUGH, FIRST STREET OVER
     7             MCGUIRE RUN, BRIDGE REPLACEMENT               138,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $110,000)
    10             (LAND ALLOCATION - $14,000)
    11             (DESIGN AND CONTINGENCIES - $14,000)
    12         (21)  TIDIOUTE BOROUGH, GRANT STREET OVER
    13             TIDIOUTE CREEK, BRIDGE REPLACEMENT            130,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $104,000)
    16             (LAND ALLOCATION - $13,000)
    17             (DESIGN AND CONTINGENCIES - $13,000)
    18         (22)  SUGAR GROVE TOWNSHIP, T-452 ON DEER
    19             RUN ROAD OVER PATCHEN RUN, BRIDGE
    20             REPLACEMENT                                   140,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $112,000)
    23             (LAND ALLOCATION - $14,000)
    24             (DESIGN AND CONTINGENCIES - $14,000)
    25     (B)  STATE BRIDGES
    26         (1)  S.R.0957 OVER STILLWATER CREEK, SUGAR
    27             GROVE TOWNSHIP, BRIDGE REPLACEMENT            350,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $300,000)
    30             (LAND ALLOCATION - $20,000)
    19910H1959B3288                 - 200 -

     1             (DESIGN AND CONTINGENCIES - $30,000)
     2         (2)  S.R.3005 ON HICKORY STREET OVER
     3             ALLEGHENY RUN, WARREN BOROUGH, BRIDGE
     4             REHABILITATION                              2,000,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $1,850,000)
     7             (LAND ALLOCATION - $50,000)
     8             (DESIGN AND CONTINGENCIES - $100,000)
     9         (3)  S.R.3010 OVER WHITNEY RUN, SPRING
    10             CREEK TOWNSHIP, BRIDGE REPLACEMENT            440,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $390,000)
    13             (LAND ALLOCATION - $20,000)
    14             (DESIGN AND CONTINGENCIES - $30,000)
    15         (4)  S.R.0127 OVER GORDON RUN, TRIUMPH
    16             TOWNSHIP, BRIDGE REPLACEMENT                  300,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $250,000)
    19             (LAND ALLOCATION - $20,000)
    20             (DESIGN AND CONTINGENCIES - $30,000)
    21         (5)  S.R.0027 OVER HOSMER CREEK, PITTSFIELD
    22             TOWNSHIP, BRIDGE REPLACEMENT                  560,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $480,000)
    25             (LAND ALLOCATION - $30,000)
    26             (DESIGN AND CONTINGENCIES - $50,000)
    27         (6)  S.R.3010 OVER BROKENSTRAW CREEK,
    28             SPRING CREEK TOWNSHIP, BRIDGE
    29             REPLACEMENT                                 1,450,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19910H1959B3288                 - 201 -

     1             $1,200,000)
     2             (LAND ALLOCATION - $50,000)
     3             (DESIGN AND CONTINGENCIES - $200,000)
     4         (7)  S.R.3014 ON COLE HILL ROAD OVER
     5             BROKENSTRAW CREEK, PITTSFIELD TOWNSHIP,
     6             BRIDGE REPLACEMENT                            600,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $520,000)
     9             (LAND ALLOCATION - $10,000)
    10             (DESIGN AND CONTINGENCIES - $70,000)
    11         (8)  S.R.3022 OVER IRVINE RUN, BROKENSTRAW
    12             TOWNSHIP, BRIDGE REPLACEMENT                  630,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $500,000)
    15             (LAND ALLOCATION - $30,000)
    16             (DESIGN AND CONTINGENCIES - $100,000)
    17         (9)  S.R.0059, T.R.59, DEVILS ELBOW BRIDGE
    18             OVER JAKES RUN, MEAD TOWNSHIP, BRIDGE
    19             REHABILITATION                              2,000,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $1,830,000)
    22             (LAND ALLOCATION - $20,000)
    23             (DESIGN AND CONTINGENCIES - $150,000)
    24         (10)  S.R.0069 ON JACKSON ROAD OVER JACKSON
    25             RUN, CONEWANGO TOWNSHIP, BRIDGE
    26             REPLACEMENT                                   330,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $281,000)
    29             (LAND ALLOCATION - $17,000)
    30             (DESIGN AND CONTINGENCIES - $32,000)
    19910H1959B3288                 - 202 -

     1         (11)  S.R.0069 ON JACKSON ROAD OVER JACKSON
     2             RUN, CONEWANGO TOWNSHIP, BRIDGE
     3             REPLACEMENT                                   320,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $272,000)
     6             (LAND ALLOCATION - $16,000)
     7             (DESIGN AND CONTINGENCIES - $32,000)
     8         (12)  S.R.0958 OVER LITTLE BROKENSTRAW
     9             CREEK, FREEHOLD TOWNSHIP, BRIDGE
    10             REPLACEMENT                                   240,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $204,000)
    13             (LAND ALLOCATION - $12,000)
    14             (DESIGN AND CONTINGENCIES - $24,000)
    15         (13)  S.R.2010 BROWN RUN ROAD OVER BROWNS
    16             RUN, MEAD TOWNSHIP, BRIDGE REPLACEMENT        320,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $272,000)
    19             (LAND ALLOCATION - $16,000)
    20             (DESIGN AND CONTINGENCIES - $32,000)
    21         (14)  S.R.0006 IN VILLAGE OF SAYBROOK OVER
    22             FOUR MILE RUN, SHEFFIELD TOWNSHIP,
    23             BRIDGE REPLACEMENT                            451,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $383,000)
    26             (LAND ALLOCATION - $23,000)
    27             (DESIGN AND CONTINGENCIES - $45,000)
    28  SECTION 67.  WASHINGTON COUNTY.
    29     (A)  LOCAL BRIDGES
    30         (1)  CECIL TOWNSHIP, SEGMENT 0130 OFFSET
    19910H1959B3288                 - 203 -

     1             2811, BRIDGE REPLACEMENT                      250,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $250,000)
     4         (2)  CECIL TOWNSHIP, SEGMENT 0080 OFFSET
     5             1384, BRIDGE REPLACEMENT                       60,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $60,000)
     8         (3)  CROSS CREEK TOWNSHIP, SEGMENT 0020
     9             OFFSET 0027, BRIDGE REPLACEMENT               500,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $500,000)
    12         (4)  CANONSBURG BOROUGH, SOUTH CENTRAL
    13             AVENUE OVER BRANCH OF CHARTIERS CREEK,
    14             BRIDGE REPLACEMENT                          1,000,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $1,000,000)
    17         (5)  DONEGAL TOWNSHIP, SEGMENT 0080 OFFSET
    18             0039, BRIDGE REPLACEMENT                      325,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $325,000)
    21         (6)  CROSS CREEK TOWNSHIP, T-433, PARKER
    22             ROAD BRIDGE OVER MIDDLE FORK CREEK,
    23             BRIDGE REPLACEMENT                             73,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $67,000)
    26             (DESIGN AND CONTINGENCIES - $6,000)
    27     (B)  STATE BRIDGES
    28         (1)  S.R.0040, LANE-BANE BRIDGE OVER
    29             MONONGAHELA RIVER, WEST BROWNSVILLE
    30             BOROUGH, BRIDGE REHABILITATION              6,805,000
    19910H1959B3288                 - 204 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $6,000,000)
     3             (LAND ALLOCATION - $5,000)
     4             (DESIGN AND CONTINGENCIES - $800,000)
     5         (2)  S.R.0136, BEAU STREET BRIDGE OVER I-
     6             70, EAST WASHINGTON BOROUGH, BRIDGE
     7             REHABILITATION                              1,266,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $1,142,000)
    10             (LAND ALLOCATION - $10,000)
    11             (DESIGN AND CONTINGENCIES - $114,000)
    12         (3)  S.R.0231, TEMPLETON BRIDGE OVER BRANCH
    13             OF TEMPLETON'S FORK, EAST FINLEY
    14             TOWNSHIP, BRIDGE REPLACEMENT                  250,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $200,000)
    17             (LAND ALLOCATION - $20,000)
    18             (DESIGN AND CONTINGENCIES - $30,000)
    19         (4)  S.R.0917, SAW MILL RUN BRIDGE OVER
    20             BRANCH OF SAW MILL RUN, FALLOWFIELD
    21             TOWNSHIP, BRIDGE REPLACEMENT                  275,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $225,000)
    24             (LAND ALLOCATION - $20,000)
    25             (DESIGN AND CONTINGENCIES - $30,000)
    26         (5)  S.R.0980, CANONSBURG BRIDGE NO.1 OVER
    27             CHARTIERS CREEK, CANONSBURG BOROUGH,
    28             BRIDGE REPLACEMENT                          1,010,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $885,000)
    19910H1959B3288                 - 205 -

     1             (LAND ALLOCATION - $40,000)
     2             (DESIGN AND CONTINGENCIES - $85,000)
     3         (6)  S.R.0980, CANONSBURG BRIDGE NO.2 OVER
     4             BRIDGE OF CHARTIERS CREEK, CANONSBURG
     5             BOROUGH, BRIDGE REPLACEMENT                   590,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $500,000)
     8             (LAND ALLOCATION - $40,000)
     9             (DESIGN AND CONTINGENCIES - $50,000)
    10         (7)  S.R.1087, CROOKHAM BRIDGE OVER MINGO
    11             CREEK, CARROLL TOWNSHIP, BRIDGE
    12             REPLACEMENT                                   190,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $159,000)
    15             (LAND ALLOCATION - $15,000)
    16             (DESIGN AND CONTINGENCIES - $16,000)
    17         (8)  S.R.2037, WESTSIDE BRIDGE OVER
    18             WESTSIDE CREEK, FALLOWFIELD TOWNSHIP,
    19             BRIDGE REPLACEMENT                             84,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $66,000)
    22             (LAND ALLOCATION - $11,000)
    23             (DESIGN AND CONTINGENCIES - $7,000)
    24         (9)  S.R.4004, RACCOON CREEK BRIDGE OVER
    25             RACCOON CREEK, HANOVER AND SMITH
    26             TOWNSHIPS, BRIDGE REPLACEMENT                 750,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $650,000)
    29             (LAND ALLOCATION - $20,000)
    30             (DESIGN AND CONTINGENCIES - $80,000)
    19910H1959B3288                 - 206 -

     1         (10)  S.R.4037, ROBINSON RUN BRIDGE OVER
     2             BRANCH OF ROBINSON RUN, ROBINSON
     3             TOWNSHIP, BRIDGE REPLACEMENT                  400,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $345,000)
     6             (LAND ALLOCATION - $20,000)
     7             (DESIGN AND CONTINGENCIES - $35,000)
     8         (11)  S.R.1002, SEGMENT 0100 OFFSET 1284,
     9             PETERS TOWNSHIP, BRIDGE REPLACEMENT           750,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $750,000)
    12         (12)  S.R.2041 OVER BRANCH OF PIKE RUN,
    13             WEST PIKE RUN TOWNSHIP, BRIDGE
    14             REPLACEMENT                                   500,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $500,000)
    17         (13)  S.R.4018, CROSS CREEK BRIDGE EAST OF
    18             AVELLA, BRIDGE REPLACEMENT                    350,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $350,000)
    21         (14)  S.R.3023 OVER LR798, DONEGAL
    22             TOWNSHIP, BRIDGE REPLACEMENT                  750,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $750,000)
    25         (15)  S.R.1010 OVER BRUSH RUN, PETERS
    26             TOWNSHIP, BRIDGE REPLACEMENT                  750,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $750,000)
    29         (16)  S.R.0519, SEGMENT 0150 OFFSET 0921,
    30             NORTH STRABANE TOWNSHIP, BRIDGE
    19910H1959B3288                 - 207 -

     1             REPLACEMENT                                 1,500,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $1,500,000)
     4  SECTION 68. WAYNE COUNTY.
     5     (A)  LOCAL BRIDGES
     6         (1)  BUCKINGHAM TOWNSHIP, T-603, BRIDGE
     7             NO.5 OVER EQUINUNK CREEK (FACTORY),
     8             BRIDGE REPLACEMENT                            281,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $250,000)
    11             (LAND ALLOCATION - $1,000)
    12             (DESIGN AND CONTINGENCIES - $30,000)
    13         (2)  DAMASCUS TOWNSHIP, T-508, BRIDGE NO.9
    14             OVER SOUTH BRANCH OF CALKINS CREEK
    15             (BOYD'S MILLS), BRIDGE REPLACEMENT            132,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $110,000)
    18             (LAND ALLOCATION - $2,000)
    19             (DESIGN AND CONTINGENCIES - $20,000)
    20         (3)  DAMASCUS TOWNSHIP, T-677, BRIDGE NO.10
    21             OVER NORTH BRANCH OF CALKINS CREEK
    22             (HIGH BRIDGE), BRIDGE REPLACEMENT             122,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $100,000)
    25             (LAND ALLOCATION - $2,000)
    26             (DESIGN AND CONTINGENCIES - $20,000)
    27         (4)  DAMASCUS TOWNSHIP, T-636, BRIDGE NO.11
    28             OVER NORTH BRANCH OF CALKINS CREEK
    29             (BISHOFF), BRIDGE REPLACEMENT                 220,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19910H1959B3288                 - 208 -

     1             $180,000)
     2             (LAND ALLOCATION - $10,000)
     3             (DESIGN AND CONTINGENCIES - $30,000)
     4         (5)  PRESTON TOWNSHIP, T-682, BRIDGE NO.30
     5             OVER EQUINUNK CREEK (DOLANS), BRIDGE
     6             REPLACEMENT                                   172,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $150,000)
     9             (LAND ALLOCATION - $2,000)
    10             (DESIGN AND CONTINGENCIES - $20,000)
    11         (6)  PRESTON TOWNSHIP, T-684, BRIDGE NO.31
    12             OVER EQUINUNK CREEK (WILLIAMS), BRIDGE
    13             REPLACEMENT                                   209,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $180,000)
    16             (LAND ALLOCATION - $4,000)
    17             (DESIGN AND CONTINGENCIES - $25,000)
    18         (7)  PROMPTON BOROUGH, T-444, BRIDGE NO.32
    19             OVER VAN AUKEN CREEK, BRIDGE
    20             REPLACEMENT                                   180,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $150,000)
    23             (LAND ALLOCATION - $5,000)
    24             (DESIGN AND CONTINGENCIES - $25,000)
    25     (B)  STATE BRIDGES
    26         (1)  S.R.1016 BRIDGE OVER HOLLISTER CREEK,
    27             DAMASCUS TOWNSHIP, BRIDGE REPLACEMENT         415,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $360,000)
    30             (LAND ALLOCATION - $10,000)
    19910H1959B3288                 - 209 -

     1             (DESIGN AND CONTINGENCIES - $45,000)
     2         (2)  S.R.0191 OVER DYBERRY CREEK, DYBERRY
     3             TOWNSHIP, BRIDGE REPLACEMENT                  570,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $500,000)
     6             (LAND ALLOCATION - $10,000)
     7             (DESIGN AND CONTINGENCIES - $60,000)
     8         (3)  S.R.0006 BRIDGE OVER LACKAWAXEN RIVER,
     9             HAWLEY BOROUGH, BRIDGE REPLACEMENT          2,395,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $2,120,000)
    12             (LAND ALLOCATION - $20,000)
    13             (DESIGN AND CONTINGENCIES - $255,000)
    14         (4)  S.R.4043 BRIDGE OVER BRANCH OF SHERMAN
    15             CREEK, SCOTT TOWNSHIP, BRIDGE
    16             REPLACEMENT                                   469,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $410,000)
    19             (LAND ALLOCATION - $10,000)
    20             (DESIGN AND CONTINGENCIES - $49,000)
    21         (5)  S.R.4023, BRIDGE NO.2 OVER WEST BRANCH
    22             OF LACKAWAXEN RIVER, MOUNT PLEASANT
    23             TOWNSHIP, BRIDGE REPLACEMENT                  410,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $358,000)
    26             (LAND ALLOCATION - $10,000)
    27             (DESIGN AND CONTINGENCIES - $42,000)
    28         (6)  S.R.4037 BRIDGE OVER OQUAGA CREEK,
    29             SCOTT TOWNSHIP, BRIDGE REPLACEMENT            805,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19910H1959B3288                 - 210 -

     1             $710,000)
     2             (LAND ALLOCATION - $10,000)
     3             (DESIGN AND CONTINGENCIES - $85,000)
     4         (7)  S.R.1002 OVER DELAWARE RIVER, DAMASCUS
     5             TOWNSHIP, BRIDGE REPLACEMENT                3,410,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $3,000,000)
     8             (LAND ALLOCATION - $10,000)
     9             (DESIGN AND CONTINGENCIES - $400,000)
    10         (8)  S.R.0191 OVER DELAWARE RIVER,
    11             BUCKINGHAM TOWNSHIP, BRIDGE
    12             REPLACEMENT                                 1,240,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $1,100,000)
    15             (LAND ALLOCATION - $10,000)
    16             (DESIGN AND CONTINGENCIES - $130,000)
    17         (9)  S.R.4023 BRIDGE OVER WEST BRANCH OF
    18             LACKAWAXEN RIVER, MOUNT PLEASANT
    19             TOWNSHIP, BRIDGE REPLACEMENT                  410,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $358,000)
    22             (LAND ALLOCATION - $10,000)
    23             (DESIGN AND CONTINGENCIES - $42,000)
    24         (10)  S.R.4008 BRIDGE OVER JOHNSON CREEK,
    25             MOUNT PLEASANT TOWNSHIP, BRIDGE
    26             REPLACEMENT                                   395,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $344,000)
    29             (LAND ALLOCATION - $10,000)
    30             (DESIGN AND CONTINGENCIES - $41,000)
    19910H1959B3288                 - 211 -

     1         (11)  S.R.0296 BRIDGE OVER BRANCH OF MIDDLE
     2             CREEK,
     3             CANAAN TOWNSHIP, BRIDGE REPLACEMENT           420,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $365,000)
     6             (LAND ALLOCATION - $10,000)
     7             (DESIGN AND CONTINGENCIES - $45,000)
     8         (12)  S.R.0296 BRIDGE OVER BRANCH OF
     9             LACKAWAXEN RIVER, CLINTON TOWNSHIP,
    10             BRIDGE REPLACEMENT                            585,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $515,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $60,000)
    15         (13)  S.R.0196 BRIDGE OVER MIDDLE CREEK,
    16             LAKE TOWNSHIP, BRIDGE REPLACEMENT           1,018,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $900,000)
    19             (LAND ALLOCATION - $10,000)
    20             (DESIGN AND CONTINGENCIES - $108,000)
    21         (14)  S.R.0191 BRIDGE OVER SHEHAWKEN CREEK,
    22             BUCKINGHAM TOWNSHIP, BRIDGE
    23             REPLACEMENT                                   816,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $720,000)
    26             (LAND ALLOCATION - $10,000)
    27             (DESIGN AND CONTINGENCIES - $86,000)
    28         (15)  S.R.0191 BRIDGE OVER BRANCH OF
    29             WALLENPAUPACK CREEK, DREHER TOWNSHIP,
    30             BRIDGE REPLACEMENT                            402,000
    19910H1959B3288                 - 212 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $350,000)
     3             (LAND ALLOCATION - $10,000)
     4             (DESIGN AND CONTINGENCIES - $42,000)
     5         (16)  S.R.0507 BRIDGE OVER WALLENPAUPACK
     6             CREEK, DREHER TOWNSHIP, BRIDGE
     7             REPLACEMENT                                   710,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $625,000)
    10             (LAND ALLOCATION - $10,000)
    11             (DESIGN AND CONTINGENCIES - $75,000)
    12         (17)  S.R.1023 BRIDGE OVER SOUTH BRANCH
    13             EQUINUNK CREEK, MANCHESTER TOWNSHIP,
    14             BRIDGE REPLACEMENT                            402,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $350,000)
    17             (LAND ALLOCATION - $10,000)
    18             (DESIGN AND CONTINGENCIES - $42,000)
    19         (18)  S.R.4007 BRIDGE OVER CROOKED CREEK,
    20             BUCKINGHAM TOWNSHIP, BRIDGE
    21             REPLACEMENT                                   458,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $400,000)
    24             (LAND ALLOCATION - $10,000)
    25             (DESIGN AND CONTINGENCIES - $48,000)
    26         (19)  S.R.4007 BRIDGE OVER EQUINUNK CREEK,
    27             MANCHESTER TOWNSHIP, BRIDGE
    28             REPLACEMENT                                   660,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $580,000)
    19910H1959B3288                 - 213 -

     1             (LAND ALLOCATION - $10,000)
     2             (DESIGN AND CONTINGENCIES - $70,000)
     3         (20)  S.R.3046 BRIDGE OVER SPRING RUN,
     4             DREHER TOWNSHIP, BRIDGE REPLACEMENT           346,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $300,000)
     7             (LAND ALLOCATION - $10,000)
     8             (DESIGN AND CONTINGENCIES - $36,000)
     9         (21)  S.R.3002 BRIDGE OVER STEVENS CREEK,
    10             STERLING TOWNSHIP, BRIDGE REPLACEMENT         503,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $440,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $53,000)
    15         (22)  S.R.2007 BRIDGE OVER CARLEY BROOK,
    16             HONESDALE BOROUGH, BRIDGE REPLACEMENT         462,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $404,000)
    19             (LAND ALLOCATION - $10,000)
    20             (DESIGN AND CONTINGENCIES - $48,000)
    21  SECTION 69. WESTMORELAND COUNTY.
    22     (A)  LOCAL BRIDGES
    23         (1)  LATROBE BOROUGH, LOYALHANNA STREET
    24             BRIDGE OVER CONRAIL AND S.R.9900,
    25             BRIDGE REPLACEMENT                            450,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $400,000)
    28             (LAND ALLOCATION - $50,000)
    29         (2)  HEMPFIELD TOWNSHIP, T-471, BRIDGE ON
    30             LASH ROAD, BRIDGE REPLACEMENT                 518,000
    19910H1959B3288                 - 214 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $450,000)
     3             (DESIGN AND CONTINGENCIES - $68,000)
     4         (3)  SEWICKLEY TOWNSHIP, T-623 OVER
     5             TRIBUTARY OF LITTLE SEWICKLEY CREEK,
     6             BRIDGE REPLACEMENT                            130,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $100,000)
     9             (LAND ALLOCATION - $10,000)
    10             (DESIGN AND CONTINGENCIES - $20,000)
    11         (4)  HEMPFIELD TOWNSHIP, T-398, OLD ROUTE
    12             NO.30, BRIDGE REPLACEMENT                     530,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $400,000)
    15             (LAND ALLOCATION - $40,000)
    16             (DESIGN AND CONTINGENCIES - $90,000)
    17         (5)  HEMPFIELD TOWNSHIP, T-865, OLD AIRPORT
    18             ROAD HILL BRIDGE, BRIDGE REPLACEMENT          630,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $500,000)
    21             (LAND ALLOCATION - $30,000)
    22             (DESIGN AND CONTINGENCIES - $100,000)
    23         (6)  HEMPFIELD TOWNSHIP, T-987, BROOKDALE
    24             BRIDGE, BRIDGE REPLACEMENT                    550,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $450,000)
    27             (LAND ALLOCATION - $10,000)
    28             (DESIGN AND CONTINGENCIES - $90,000)
    29         (7)  CITY OF GREENSBURG, LAIRD STREET
    30             BRIDGE, BRIDGE REPLACEMENT                    235,000
    19910H1959B3288                 - 215 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $200,000)
     3             (LAND ALLOCATION - $5,000)
     4             (DESIGN AND CONTINGENCIES - $30,000)
     5         (8)  MURRYSVILLE BOROUGH AND WASHINGTON
     6             TOWNSHIP, LUDWIG ROAD BRIDGE NO.39,
     7             BRIDGE REPLACEMENT                            190,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $150,000)
    10             (LAND ALLOCATION - $5,000)
    11             (DESIGN AND CONTINGENCIES - $35,000)
    12         (9)  SEWICKLEY TOWNSHIP, T-398 BRIDGE OVER
    13             LITTLE SEWICKLEY CREEK, BRIDGE
    14             REPLACEMENT                                   703,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $630,000)
    17             (LAND ALLOCATION - $10,000)
    18             (DESIGN AND CONTINGENCIES - $63,000)
    19         (10)  MURRYSVILLE AND DELMONT BOROUGHS, OLD
    20             WILLIAM PENN HIGHWAY BRIDGE E11, BRIDGE
    21             REPLACEMENT                                   185,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $150,000)
    24             (DESIGN AND CONTINGENCIES - $35,000)
    25         (11)  MURRYSVILLE BOROUGH, KEMERER ROAD
    26             BRIDGE NO.20 OVER BRANCH OF STEELS RUN,
    27             BRIDGE REPLACEMENT                             95,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $75,000)
    30             (DESIGN AND CONTINGENCIES - $20,000)
    19910H1959B3288                 - 216 -

     1         (12)  YOUNGWOOD BOROUGH, HILLIS STREET
     2             BRIDGE NO.64, BRIDGE REPLACEMENT              265,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $233,000)
     5             (LAND ALLOCATION - $10,000)
     6             (DESIGN AND CONTINGENCIES - $22,000)
     7         (13)  YOUNGWOOD BOROUGH, DEPOT STREET
     8             BRIDGE, BRIDGE REPLACEMENT                    545,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $475,000)
    11             (LAND ALLOCATION - $10,000)
    12             (DESIGN AND CONTINGENCIES - $60,000)
    13         (14)  HEMPFIELD TOWNSHIP, T-398, OLD ROUTE
    14             30 BRIDGE, BRIDGE REPLACEMENT                 230,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $200,000)
    17             (DESIGN AND CONTINGENCIES - $30,000)
    18         (15)  HEMPFIELD TOWNSHIP, T-470, LADYSMITH
    19             ROAD BRIDGE, BRIDGE REPLACEMENT               690,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $600,000)
    22             (DESIGN AND CONTINGENCIES - $90,000)
    23         (16)  HEMPFIELD TOWNSHIP, T-748, SWEITZER
    24             ROAD BRIDGE, BRIDGE REPLACEMENT               920,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $800,000)
    27             (DESIGN AND CONTINGENCIES - $120,000)
    28         (17)  HEMPFIELD TOWNSHIP, T-474, WHIGHAM
    29             ROAD BRIDGE, BRIDGE REPLACEMENT               576,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19910H1959B3288                 - 217 -

     1             $500,000)
     2             (LAND ALLOCATION - $1,000)
     3             (DESIGN AND CONTINGENCIES - $75,000)
     4         (18)  HEMPFIELD TOWNSHIP, T-655, ROCKY
     5             MOUNTAIN BRIDGE, BRIDGE REPLACEMENT           518,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $450,000)
     8             (DESIGN AND CONTINGENCIES - $68,000)
     9         (19)  HEMPFIELD TOWNSHIP, T-792, PORE ROAD
    10             BRIDGE, BRIDGE REPLACEMENT                    230,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $200,000)
    13             (DESIGN AND CONTINGENCIES - $30,000)
    14         (20) HEMPFIELD TOWNSHIP, T-865, AIRPORT
    15             HILL ROAD BRIDGE, BRIDGE REPLACEMENT          575,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $500,000)
    18             (DESIGN AND CONTINGENCIES - $75,000)
    19         (21)  HEMPFIELD TOWNSHIP, T-987, BROOKDALE
    20             DRIVE BRIDGE, BRIDGE REPLACEMENT              518,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $450,000)
    23             (DESIGN AND CONTINGENCIES - $68,000)
    24         (22)  NEW BRIDGE SPANNING ALLEGHENY RIVER
    25             TO CONNECT S.R.0028 AND S.R.0366,
    26             BRIDGE REPLACEMENT                        131,500,000
    27         (23)  CITY OF NEW KENSINGTON, LOCUST STREET
    28             VIADUCT, BRIDGE REPLACEMENT                 1,500,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $1,500,000)
    19910H1959B3288                 - 218 -

     1         (24)  CITY OF LOWER BURRELL, EDGECLIFF ROAD
     2             BRIDGE, BRIDGE REPLACEMENT                    225,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $225,000)
     5         (25)  NORTH HUNTINGTON TOWNSHIP, BRATKOVICH
     6             ROAD BRIDGE, BRIDGE REPLACEMENT             9,152,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $9,152,000)
     9         (26)  NORTH HUNTINGTON TOWNSHIP, LONG RUN
    10             BRIDGE OVER LONG RUN, BRIDGE
    11             REPLACEMENT                                    46,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $32,000)
    14             (LAND ALLOCATION - $11,000)
    15             (DESIGN AND CONTINGENCIES - $3,000)
    16         (27)  WALLACE AVENUE BRIDGE, BRIDGE
    17             REPLACEMENT                                    22,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $12,000)
    20             (DESIGN AND CONTINGENCIES - $10,000)
    21         (28)  NORTH HUNTINGTON TOWNSHIP, MCCAVETT
    22             ROAD BRIDGE OVER CONRAIL, BRIDGE
    23             REPLACEMENT                                 1,115,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $1,015,000)
    26             (LAND ALLOCATION - $10,000)
    27             (DESIGN AND CONTINGENCIES - $90,000)
    28         (29)  CITY OF NEW KENSINGTON, BRIDGE NO.1,
    29             LOCUST STREET, BRIDGE REPLACEMENT              30,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19910H1959B3288                 - 219 -

     1             $30,000)
     2         (30)  CITY OF NEW KENSINGTON, FOURTH STREET
     3             BRIDGE NO.2 OVER LITTLE PUCKETA CREEK,
     4             BRIDGE CONSTRUCTION                            16,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $16,000)
     7         (31)  CITY OF NEW KENSINGTON, FOURTH STREET
     8             BRIDGE NO.2, BRIDGE REPLACEMENT                29,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $29,000)
    11         (32)  CITY OF NEW KENSINGTON, LOCUST STREET
    12             BRIDGE NO.1 OVER CONRAIL RAILROAD,
    13             BRIDGE CONSTRUCTION                            65,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $65,000)
    16         (33)  UPPER BURRELL TOWNSHIP, HARTGE ROAD
    17             OVER LITTLE PUCKETA CREEK, BRIDGE
    18             REPLACEMENT                                   110,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $100,000)
    21             (DESIGN AND CONTINGENCIES - $10,000)
    22     (B)  STATE BRIDGES
    23         (1)  S.R.0056, SEWARD BRIDGE OVER RAILROAD
    24             AND BOROUGH ROAD, ST. CLAIR TOWNSHIP,
    25             BRIDGE REPLACEMENT                          2,650,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $2,385,000)
    28             (LAND ALLOCATION - $40,000)
    29             (DESIGN AND CONTINGENCIES - $225,000)
    30         (2)  S.R.0070 BRIDGE OVER S.R.3005 NEAR
    19910H1959B3288                 - 220 -

     1             PRICEDALE, ROSTRAVER TOWNSHIP, BRIDGE
     2             REHABILITATION                              1,405,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $1,250,000)
     5             (DESIGN AND CONTINGENCIES - $155,000)
     6         (3)  S.R.0070 BRIDGE OVER S.R.3003 NEAR
     7             SPEERS RUN, ROSTRAVER TOWNSHIP, BRIDGE
     8             REHABILITATION                              3,424,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $3,140,000)
    11             (DESIGN AND CONTINGENCIES - $284,000)
    12         (4)  S.R.0259, SNYDERS RUN BRIDGE OVER
    13             BRANCH OF SNYDERS RUN, FAIRFIELD
    14             TOWNSHIP, BRIDGE REPLACEMENT                  375,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $315,000)
    17             (LAND ALLOCATION - $30,000)
    18             (DESIGN AND CONTINGENCIES - $30,000)
    19         (5)  S.R.0259, CONRAIL BOLIVAR UNDERPASS
    20             NO.2 OVER S.R.0259, BOLIVAR BOROUGH AND
    21             FAIRFIELD TOWNSHIP, BRIDGE REPLACEMENT        460,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $350,000)
    24             (LAND ALLOCATION - $10,000)
    25             (DESIGN AND CONTINGENCIES - $100,000)
    26         (6)  S.R.0711, KOFFER RUN BRIDGE OVER
    27             KOFFER RUN, LIGONIER TOWNSHIP, BRIDGE
    28             REPLACEMENT                                   350,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $300,000)
    19910H1959B3288                 - 221 -

     1             (LAND ALLOCATION - $20,000)
     2             (DESIGN AND CONTINGENCIES - $30,000)
     3         (7)  S.R.1019, HANNA'S RUN BRIDGE OVER
     4             BRANCH OF HANNA'S RUN, LIGONIER
     5             TOWNSHIP, BRIDGE REPLACEMENT                  350,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $300,000)
     8             (LAND ALLOCATION - $20,000)
     9             (DESIGN AND CONTINGENCIES - $30,000)
    10         (8)  S.R.1028, LUXOR BRIDGE OVER LITTLE
    11             CRABTREE CREEK, HEMPFIELD TOWNSHIP,
    12             BRIDGE REPLACEMENT                            350,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $300,000)
    15             (LAND ALLOCATION - $20,000)
    16             (DESIGN AND CONTINGENCIES - $30,000)
    17         (9)  S.R.1071, HENDRICKS CREEK BRIDGE AND
    18             APPROACH, T-987, BRIDGE REPLACEMENT           270,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $240,000)
    21             (LAND ALLOCATION - $5,000)
    22             (DESIGN AND CONTINGENCIES - $25,000)
    23         (10)  S.R.3003, SPEERS RUN BRIDGE OVER
    24             SPEERS RUN, ROSTRAVER TOWNSHIP, BRIDGE
    25             REPLACEMENT                                   475,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $415,000)
    28             (LAND ALLOCATION - $20,000)
    29             (DESIGN AND CONTINGENCIES - $40,000)
    30         (11)  S.R.3022 BRIDGE OVER SMALL STREAM,
    19910H1959B3288                 - 222 -

     1             NORTH HUNTINGDON TOWNSHIP, BRIDGE
     2             REPLACEMENT                                   425,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $370,000)
     5             (LAND ALLOCATION - $20,000)
     6             (DESIGN AND CONTINGENCIES - $35,000)
     7         (12)  S.R.4024, BOQUET BRIDGE OVER BRUSH
     8             RUN, PENN TOWNSHIP, BRIDGE REPLACEMENT        297,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $263,000)
    11             (LAND ALLOCATION - $10,000)
    12             (DESIGN AND CONTINGENCIES - $24,000)
    13         (13)  S.R.0070, I-70 BRIDGE OVER SEWICKLEY
    14             CREEK, SEWICKLEY TOWNSHIP, BRIDGE
    15             REHABILITATION                                660,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $600,000)
    18             (DESIGN AND CONTINGENCIES - $60,000)
    19         (14)  S.R.4075 OVER CHARTIERS RUN, UPPER
    20             BURRELL TOWNSHIP, BRIDGE REPLACEMENT          110,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $50,000)
    23             (LAND ALLOCATION - $10,000)
    24             (DESIGN AND CONTINGENCIES - $50,000)
    25         (15)  S.R.4036 OVER PUCKETA CREEK, UPPER
    26             BURRELL TOWNSHIP, BRIDGE REPLACEMENT          420,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $350,000)
    29             (LAND ALLOCATION - $20,000)
    30             (DESIGN AND CONTINGENCIES - $50,000)
    19910H1959B3288                 - 223 -

     1         (16)  S.R.4032 BRIDGE OVER PUCKETA CREEK,
     2             UPPER BURRELL TOWNSHIP, BRIDGE
     3             REPLACEMENT                                   135,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $75,000)
     6             (LAND ALLOCATION - $10,000)
     7             (DESIGN AND CONTINGENCIES - $50,000)
     8         (17)  S.R.4075 OVER CHARTIERS RUN, UPPER
     9             BURRELL TOWNSHIP, BRIDGE REPLACEMENT          110,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $50,000)
    12             (LAND ALLOCATION - $10,000)
    13             (DESIGN AND CONTINGENCIES - $50,000)
    14         (18)  S.R.0366 OVER LITTLE PUCKETA CREEK,
    15             CITY OF NEW KENSINGTON, BRIDGE
    16             REPLACEMENT                                   470,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $400,000)
    19             (LAND ALLOCATION - $20,000)
    20             (DESIGN AND CONTINGENCIES - $50,000)
    21         (19)  S.R.0056 OVER LITTLE PUCKETA CREEK,
    22             CITY OF NEW KENSINGTON, BRIDGE
    23             REPLACEMENT                                   160,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $100,000)
    26             (LAND ALLOCATION - $10,000)
    27             (DESIGN AND CONTINGENCIES - $50,000)
    28         (20)  S.R.0056 BRIDGE OVER BRANCH OF
    29             PUCKETA CREEK, CITY OF LOWER BURRELL,
    30             BRIDGE REPLACEMENT                            110,000
    19910H1959B3288                 - 224 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $50,000)
     3             (LAND ALLOCATION - $10,000)
     4             (DESIGN AND CONTINGENCIES - $50,000)
     5         (21)  S.R.0366 OVER PUCKETA CREEK, CITY OF
     6             LOWER BURRELL, BRIDGE REPLACEMENT             110,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $50,000)
     9             (LAND ALLOCATION - $10,000)
    10             (DESIGN AND CONTINGENCIES - $50,000)
    11         (22)  S.R.3012, SEWICKLEY BRIDGE OVER BIG
    12             SEWICKLEY CREEK, SOUTH HUNTINGTON
    13             TOWNSHIP, BRIDGE REPLACEMENT                   51,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $36,000)
    16             (LAND ALLOCATION - $11,000)
    17             (DESIGN AND CONTINGENCIES - $4,000)
    18         (23)  S.R.2033, MANSVILLE BRIDGE OVER
    19             KEEFER RUN, COOK TOWNSHIP, BRIDGE
    20             REPLACEMENT                                    59,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $44,000)
    23             (LAND ALLOCATION - $11,000)
    24             (DESIGN AND CONTINGENCIES - $4,000)
    25         (24)  S.R.0982, BRADENVILLE BRIDGE OVER
    26             SAXMORE RUN, DERRY TOWNSHIP, BRIDGE
    27             REPLACEMENT                                   446,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $385,000)
    30             (LAND ALLOCATION - $20,000)
    19910H1959B3288                 - 225 -

     1             (DESIGN AND CONTINGENCIES - $41,000)
     2         (25)  S.R.1028, LUXOR BRIDGE, HEMPFIELD
     3             TOWNSHIP, BRIDGE REPLACEMENT                  350,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $300,000)
     6             (LAND ALLOCATION - $20,000)
     7             (DESIGN AND CONTINGENCIES - $30,000)
     8         (26)  S.R.0981, SMITHTON BRIDGE OVER BARRON
     9             RUN, SOUTH HUNTINGTON TOWNSHIP, BRIDGE
    10             REPLACEMENT                                   196,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $159,000)
    13             (LAND ALLOCATION - $12,000)
    14             (DESIGN AND CONTINGENCIES - $25,000)
    15         (27)  S.R.0217, MILLER RUN BRIDGE, DERRY
    16             TOWNSHIP, BRIDGE REPLACEMENT                  220,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $180,000)
    19             (LAND ALLOCATION - $10,000)
    20             (DESIGN AND CONTINGENCIES - $30,000)
    21  SECTION 70. WYOMING COUNTY.
    22     (A)  LOCAL BRIDGES (RESERVED)
    23     (B)  STATE BRIDGES
    24         (1)  S.R.2021 BRIDGE OVER BRANCH OF BEAVER
    25             CREEK, FALLS TOWNSHIP, BRIDGE
    26             REPLACEMENT                                   783,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $690,000)
    29             (LAND ALLOCATION - $10,000)
    30             (DESIGN AND CONTINGENCIES - $83,000)
    19910H1959B3288                 - 226 -

     1         (2)  S.R.2012 BRIDGE OVER BRANCH OF
     2             TUNKHANNOCK CREEK, CLINTON TOWNSHIP,
     3             BRIDGE REPLACEMENT                            884,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $780,000)
     6             (LAND ALLOCATION - $10,000)
     7             (DESIGN AND CONTINGENCIES - $94,000)
     8         (3)  S.R.2002 BRIDGE OVER WHITELOCK CREEK,
     9             EXETER TOWNSHIP, BRIDGE REPLACEMENT           654,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $575,000)
    12             (LAND ALLOCATION - $10,000)
    13             (DESIGN AND CONTINGENCIES - $69,000)
    14         (4)  S.R.3007 BRIDGE OVER RAILROAD,
    15             WASHINGTON TOWNSHIP, BRIDGE
    16             REPLACEMENT                                   915,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $808,000)
    19             (LAND ALLOCATION - $10,000)
    20             (DESIGN AND CONTINGENCIES - $97,000)
    21         (5)  S.R.1025 BRIDGE OVER CONRAIL RAILROAD,
    22             NICHOLSON BOROUGH, BRIDGE REPLACEMENT         783,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $690,000)
    25             (LAND ALLOCATION - $10,000)
    26             (DESIGN AND CONTINGENCIES - $83,000)
    27         (6)  S.R.2027 BRIDGE OVER BEAVER CREEK,
    28             FALLS TOWNSHIP, BRIDGE REPLACEMENT            404,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $352,000)
    19910H1959B3288                 - 227 -

     1             (LAND ALLOCATION - $10,000)
     2             (DESIGN AND CONTINGENCIES - $42,000)
     3         (7)  S.R.0011 OVER T.R.6, CLINTON TOWNSHIP,
     4             BRIDGE REPLACEMENT                          1,240,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $1,100,000)
     7             (LAND ALLOCATION - $10,000)
     8             (DESIGN AND CONTINGENCIES - $130,000)
     9         (8)  S.R.0006 OVER TUSCARORA CREEK,
    10             BRAINTRIM TOWNSHIP, BRIDGE REPLACEMENT      1,910,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $1,700,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $200,000)
    15         (9)  S.R.1014 BRIDGE OVER LAKE SHERIDAN
    16             OUTLET, NICHOLSON TOWNSHIP, BRIDGE
    17             REPLACEMENT                                   390,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $340,000)
    20             (LAND ALLOCATION - $10,000)
    21             (DESIGN AND CONTINGENCIES - $40,000)
    22         (10)  S.R.0087 BRIDGE OVER SUSQUEHANNA
    23             RIVER, MEHOOPANY TOWNSHIP, BRIDGE
    24             REPLACEMENT                                 5,210,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $4,700,000)
    27             (LAND ALLOCATION - $10,000)
    28             (DESIGN AND CONTINGENCIES - $500,000)
    29         (11)  S.R.0029 BRIDGE OVER BOWMAN'S CREEK,
    30             NOXEN TOWNSHIP, BRIDGE REPLACEMENT            732,000
    19910H1959B3288                 - 228 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $645,000)
     3             (LAND ALLOCATION - $10,000)
     4             (DESIGN AND CONTINGENCIES - $77,000)
     5         (12)  S.R.2039 BRIDGE OVER BEAVER RUN
     6             CREEK, NOXEN TOWNSHIP, BRIDGE
     7             REPLACEMENT                                   738,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $650,000)
    10             (LAND ALLOCATION - $10,000)
    11             (DESIGN AND CONTINGENCIES - $78,000)
    12         (13)  S.R.3001 BRIDGE OVER LITTLE MEHOOPANY
    13             CREEK, WINDHAM TOWNSHIP, BRIDGE
    14             REPLACEMENT                                   486,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $425,000)
    17             (LAND ALLOCATION - $10,000)
    18             (DESIGN AND CONTINGENCIES - $51,000)
    19         (14)  S.R.3002 BRIDGE OVER BOWMAN'S CREEK,
    20             NOXEN TOWNSHIP, BRIDGE REPLACEMENT            928,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $820,000)
    23             (LAND ALLOCATION - $10,000)
    24             (DESIGN AND CONTINGENCIES - $98,000)
    25         (15)  S.R.0029 BRIDGE OVER SWAIL BROOK,
    26             TUNKHANNOCK BOROUGH, BRIDGE
    27             REPLACEMENT                                   540,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $473,000)
    30             (LAND ALLOCATION - $10,000)
    19910H1959B3288                 - 229 -

     1             (DESIGN AND CONTINGENCIES - $57,000)
     2         (16)  S.R.0092 BRIDGE OVER FIELD BROOK,
     3             NICHOLSON TOWNSHIP, BRIDGE REPLACEMENT        520,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $455,000)
     6             (LAND ALLOCATION - $10,000)
     7             (DESIGN AND CONTINGENCIES - $55,000)
     8         (17)  S.R.0307 BRIDGE OVER BUTTERMILK
     9             CREEK, FALLS TOWNSHIP, BRIDGE
    10             REPLACEMENT                                   592,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $520,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $62,000)
    15         (18)  S.R.0307 BRIDGE OVER BEAVER CREEK,
    16             FALLS TOWNSHIP, BRIDGE REPLACEMENT          1,208,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $1,070,000)
    19             (LAND ALLOCATION - $10,000)
    20             (DESIGN AND CONTINGENCIES - $128,000)
    21         (19)  S.R.0307 BRIDGE OVER BUTTERMILK
    22             CREEK, FALLS TOWNSHIP, BRIDGE
    23             REPLACEMENT                                   682,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $600,000)
    26             (LAND ALLOCATION - $10,000)
    27             (DESIGN AND CONTINGENCIES - $72,000)
    28         (20)  S.R.1009 BRIDGE OVER MESHOPPEN CREEK,
    29             LEMON TOWNSHIP, BRIDGE REPLACEMENT            794,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19910H1959B3288                 - 230 -

     1             $700,000)
     2             (LAND ALLOCATION - $10,000)
     3             (DESIGN AND CONTINGENCIES - $84,000)
     4         (21)  S.R.0006, SEGMENT 0490 OFFSET 0000,
     5             BARDWELL BRIDGE OVER TUNKHANNOCK CREEK,
     6             TUNKHANNOCK TOWNSHIP, BRIDGE
     7             REPLACEMENT                                 2,260,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $2,000,000)
    10             (LAND ALLOCATION - $10,000)
    11             (DESIGN AND CONTINGENCIES - $250,000)
    12         (22)  S.R.0006, SEGMENT 0560 OFFSET 0866,
    13             BRIDGE OVER S.R.1017, CLINTON TOWNSHIP,
    14             BRIDGE REPLACEMENT                            700,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $620,000)
    17             (LAND ALLOCATION - $10,000)
    18             (DESIGN AND CONTINGENCIES - $70,000)
    19         (23)  S.R.0117 SEGMENT 0020 OFFSET 1773,
    20             BRIDGE OVER OUTLET OF LAKE SHERIDAN,
    21             FACTORYVILLE BOROUGH, BRIDGE
    22             REPLACEMENT                                   280,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $240,000)
    25             (LAND ALLOCATION - $10,000)
    26             (DESIGN AND CONTINGENCIES - $30,000)
    27  SECTION 71.  YORK COUNTY.
    28     (A)  LOCAL BRIDGES
    29         (1)  PENN TOWNSHIP, FREDERICK STREET BRIDGE
    30             OVER PLUM CREEK, BRIDGE REPLACEMENT           250,000
    19910H1959B3288                 - 231 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $200,000)
     3             (LAND ALLOCATION - $10,000)
     4             (DESIGN AND CONTINGENCIES - $40,000)
     5         (2)  CITY OF YORK, NORTH BEAVER STREET
     6             BRIDGE OVER WILLIS RUN, BRIDGE
     7             REPLACEMENT                                   362,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $300,000)
    10             (LAND ALLOCATION - $12,000)
    11             (DESIGN AND CONTINGENCIES - $50,000)
    12         (3)  CITY OF YORK, NORTH PERSHING AVENUE
    13             BRIDGE OVER WILLIS RUN, BRIDGE
    14             REPLACEMENT                                   338,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $288,000)
    17             (LAND ALLOCATION - $10,000)
    18             (DESIGN AND CONTINGENCIES - $40,000)
    19         (4)  CITY OF YORK, NORTH NEWBERRY STREET
    20             BRIDGE OVER WILLIS RUN BRIDGE
    21             REPLACEMENT                                   360,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $300,000)
    24             (LAND ALLOCATION - $10,000)
    25             (DESIGN AND CONTINGENCIES - $50,000)
    26         (5)  CITY OF YORK, SMITH STREET BRIDGE OVER
    27             WILLIS RUN, BRIDGE REPLACEMENT                338,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $288,000)
    30             (LAND ALLOCATION - $10,000)
    19910H1959B3288                 - 232 -

     1             (DESIGN AND CONTINGENCIES - $40,000)
     2         (6)  NEW FREEDOM BOROUGH, COUNTY BRIDGE ON
     3             SINGER ROAD OVER COUNTY RAILROAD AND
     4             TRAIL, BRIDGE REPLACEMENT                     325,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $250,000)
     7             (LAND ALLOCATION - $10,000)
     8             (DESIGN AND CONTINGENCIES - $65,000)
     9     (B)  STATE BRIDGES
    10         (1)  S.R.0295, SUSQUEHANNA TRAIL OVER
    11             CONEWAGO CREEK, CONEWAGO AND NEWBERRY
    12             TOWNSHIPS, BRIDGE REPLACEMENT               6,260,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $5,400,000)
    15             (LAND ALLOCATION - $50,000)
    16             (DESIGN AND CONTINGENCIES - $810,000)
    17         (2)  S.R.4021 OVER BENNETTS RUN, NEWBERRY
    18             TOWNSHIP, BRIDGE REPLACEMENT                  581,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $497,000)
    21             (LAND ALLOCATION - $10,000)
    22             (DESIGN AND CONTINGENCIES - $74,000)
    23         (3)  S.R.0216, THREE BRIDGES OVER LAKE
    24             MARBURG, PENN, WEST MANHEIM AND MANHEIM
    25             TOWNSHIPS, BRIDGE REHABILITATION              970,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $825,000)
    28             (LAND ALLOCATION - $20,000)
    29             (DESIGN AND CONTINGENCIES - $125,000)
    30  SECTION 72.  STATEWIDE.
    19910H1959B3288                 - 233 -

     1     (A)  (RESERVED)
     2     (B)  STATE BRIDGES
     3         (1)  STATEWIDE BRIDGE PRESERVATION              5,000,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $4,500,000)
     6             (DESIGN AND CONTINGENCIES - $500,000)
     7  Section 72 73.  Limitation on expenditure of funds.               <--
     8     Any moneys derived from the incurring of debt shall be used
     9  solely for effecting the rehabilitation, replacement or removal
    10  of bridges located on State highways. All other bridge
    11  rehabilitation, replacement or removal shall be financed, and
    12  State bridge rehabilitation, replacement or removal may also be
    13  financed, from current revenue.
    14  Section 73 74.  Debt authorization.                               <--
    15     The Governor, Auditor General and State Treasurer are hereby
    16  authorized and directed to borrow, from time to time, in
    17  addition to any authorization heretofore or hereafter enacted,
    18  on the credit of the Commonwealth, subject to the limitations
    19  provided in the current capital budget, money not exceeding in
    20  the aggregate the sum of $5,250,000 $596,448,000 as may be found  <--
    21  necessary to carry out the acquisition and construction of the
    22  State highway projects specifically itemized in this act.
    23  Section 74 75.  Issue of bonds.                                   <--
    24     The indebtedness authorized in this act shall be incurred
    25  from time to time and shall be evidenced by one or more series
    26  of general obligation bonds of the Commonwealth in such
    27  aggregate principal amount for each series as the Governor,
    28  Auditor General and State Treasurer shall determine, but the
    29  latest stated maturity date shall not exceed 30 years from the
    30  date of the bond first issued for each series.
    19910H1959B3288                 - 234 -

     1  Section 75 76.  Estimated useful life of projects.                <--
     2     The General Assembly states the estimated useful life of the
     3  projects itemized in this act as 30 years.
     4  Section 76 77.  Appropriation.                                    <--
     5     The net proceeds of the sale of the obligations authorized in
     6  this act are hereby appropriated from the Capital Facilities
     7  Fund to the department in the maximum amount of $5,250,000        <--
     8  $596,448,000 to be used by it exclusively to defray the
     9  financial costs of the State projects specifically itemized in
    10  this capital budget. After reserving or paying the expenses of
    11  the sale of the obligation, the State Treasurer shall pay out to
    12  the department the moneys as required and certified by it to be
    13  legally due and payable.
    14  Section 77 78.  Federal funds.                                    <--
    15     In addition to those funds appropriated in section 76 77, all  <--
    16  moneys received from the Federal Government for the public
    17  improvement projects specifically itemized in this act are also
    18  hereby appropriated for those projects.
    19  Section 78 79.  Allocation of funds.                              <--
    20     (a)  General rule.--Whenever the department determines that
    21  the full estimated financial costs of the projects itemized in
    22  this act are not necessary for the proper design, acquisition or
    23  construction of such projects, the excess funds no longer
    24  required may be allocated by the department to increase the
    25  estimated costs of any one or more of the projects specifically
    26  itemized in a capital budget.
    27     (b)  Reimbursement of municipal expenditures.--Moneys raised
    28  or expended by municipalities after the effective date of this
    29  act, in anticipation of receipt of funds authorized for projects
    30  itemized by this act, may be reimbursable to those
    19910H1959B3288                 - 235 -

     1  municipalities.
     2  Section 79 80.  Policy on jobs and materials.                     <--
     3     (a)  Jobs.--It is the declared policy of the Commonwealth
     4  that the construction projects authorized in this act be used,
     5  to the greatest extent possible, to provide for the creation of
     6  jobs and the rehiring of the unemployed in this Commonwealth. In
     7  order to reach this goal, firms with Commonwealth-based
     8  facilities shall be actively solicited to make bids on contracts
     9  to furnish products and materials, including, but not limited
    10  to, steel and steel products, to be used in these projects.
    11     (b)  Materials.--Every contract document entered into to
    12  undertake a project contained in this act shall provide that any
    13  steel or other products to be used or supplied in the
    14  performance of this contract shall be required to be
    15  manufactured by plants in the United States unless the secretary
    16  determines, on a contract by contract basis, that certain
    17  required products are not produced in the United States in
    18  sufficient quantities to meet the requirements of the contract.
    19  Such a determination and the reasons therefor shall be published
    20  in the Pennsylvania Bulletin. Decisions made under this
    21  subsection shall not be inconsistent with the general provisions
    22  of the act of March 3, 1978 (P.L.6, No.3), known as the Steel
    23  Products Procurement Act.
    24  Section 80 81.  Payment of capital debt service.                  <--
    25     The repayment of any debt incurred pursuant to this act shall
    26  be made from the account and such repayment shall have first
    27  claim on the revenues of the account.
    28  Section 81 82.  Authorization and debt cumulation.                <--
    29     The additional authorization and debt allowance provided for
    30  in this act shall be added to the total authorizations and debt
    19910H1959B3288                 - 236 -

     1  incurred pursuant to the act of December 8, 1982 (P.L.848,
     2  No.235), known as the Highway-Railroad and Highway Bridge
     3  Capital Budget Act for 1982-1983, as amended.
     4  Section 82 83.  Effective date.                                   <--
     5     This act shall take effect immediately.

















    G29L72RZ/19910H1959B3288        - 237 -