PRIOR PRINTER'S NO. 2400 PRINTER'S NO. 3288
No. 1959 Session of 1991
INTRODUCED BY LESCOVITZ, CLARK AND CESSAR, AUGUST 2, 1991
AS REPORTED FROM COMMITTEE ON TRANSPORTATION, HOUSE OF REPRESENTATIVES, AS AMENDED, MARCH 18, 1992
A SUPPLEMENT 1 To the act of December 8, 1982 (P.L.848, No.235), entitled "An 2 act providing for the adoption of capital projects related to 3 the repair, rehabilitation or replacement of highway bridges 4 to be financed from current revenue or by the incurring of 5 debt and capital projects related to highway and safety 6 improvement projects to be financed from current revenue of 7 the Motor License Fund," itemizing bridge projects. 8 The General Assembly of the Commonwealth of Pennsylvania 9 hereby enacts as follows: 10 Section 1. Short title. 11 This act shall be known and may be cited as the Highway- 12 Railroad and Highway Bridge Capital Budget Supplemental Act for 13 1991-1992. 14 Section 2. Definitions. 15 The following words and phrases when used in this act shall 16 have the meanings given to them in this section unless the 17 context clearly indicates otherwise: 18 "Account." The Highway Bridge Improvement Restricted Account 19 within the Motor License Fund.
1 "Capital project." A capital project as defined in section 2 1602-B of the act of April 9, 1929 (P.L.343, No.176), known as 3 The Fiscal Code, and shall include a county or municipal bridge 4 rehabilitation, replacement or improvement project as set forth 5 in this act. 6 "Department." The Department of Transportation of the 7 Commonwealth. 8 "Secretary." The Secretary of Transportation of the 9 Commonwealth. 10 Section 3. Total authorization for bridge projects. 11 (a) Total projects.--The total authorization for the costs 12 of the projects itemized pursuant to this act and to be financed 13 from current revenue or by the incurring of debt shall be 14 $5,250,000 $952,067,000. <-- 15 (b) State projects.--The authorization for capital projects 16 in the category of highway projects to be constructed by the 17 department, its successors or assigns, and to be financed by the 18 incurring of debt or from the highway account, itemized in this 19 act under the category of State bridges, is $5,250,000 <-- 20 $596,448,000. 21 (c) Non-State projects.--The authorization for non-State 22 highway bridge projects to be constructed by municipalities and 23 to be financed in part with grants not exceeding 80% of the non- 24 Federal share of the costs made to the local government 25 municipalities by the department from revenues deposited in the 26 account itemized in this act under the category of local 27 bridges, is $0 $355,619,000. <-- 28 Section 4. Itemization of bridge projects. 29 The individual capital projects in the category of highway 30 projects to be constructed by the department, its successors or 19910H1959B3288 - 2 -
1 assigns, and to be financed from current revenue or by the 2 incurring of debt are hereby itemized, together with their 3 estimated financial costs, in the following sections. 4 Section 5. Adams County (Reserved). <-- 5 Section 6. Allegheny County (Reserved). 6 Section 7. Armstrong County (Reserved). 7 Section 8. Beaver County (Reserved). 8 Section 9. Bedford County (Reserved). 9 Section 10. Berks County (Reserved). 10 Section 11. Blair County (Reserved). 11 Section 12. Bradford County (Reserved). 12 Section 13. Bucks County (Reserved). 13 Section 14. Butler County (Reserved). 14 Section 15. Cambria County (Reserved). 15 Section 16. Cameron County (Reserved). 16 Section 17. Carbon County (Reserved). 17 Section 18. Centre County (Reserved). 18 Section 19. Chester County (Reserved). 19 Section 20. Clarion County (Reserved). 20 Section 21. Clearfield County (Reserved). 21 Section 22. Clinton County (Reserved). 22 Section 23. Columbia County (Reserved). 23 Section 24. Crawford County (Reserved). 24 Section 25. Cumberland County (Reserved). 25 Section 26. Dauphin County (Reserved). 26 Section 27. Delaware County (Reserved). 27 Section 28. Elk County (Reserved). 28 Section 29. Erie County (Reserved). 29 Section 30. Fayette County (Reserved). 30 Section 31. Forest County (Reserved). 19910H1959B3288 - 3 -
1 Section 32. Franklin County (Reserved). 2 Section 33. Fulton County (Reserved). 3 Section 34. Greene County (Reserved). 4 Section 35. Huntingdon County (Reserved). 5 Section 36. Indiana County (Reserved). 6 Section 37. Jefferson County (Reserved). 7 Section 38. Juniata County (Reserved). 8 Section 39. Lackawanna County (Reserved). 9 Section 40. Lancaster County (Reserved). 10 Section 41. Lawrence County (Reserved). 11 Section 42. Lebanon County (Reserved). 12 Section 43. Lehigh County (Reserved). 13 Section 44. Luzerne County (Reserved). 14 Section 45. Lycoming County (Reserved). 15 Section 46. McKean County (Reserved). 16 Section 47. Mercer County (Reserved). 17 Section 48. Mifflin County. 18 (a) Local Bridges (Reserved) 19 (b) State Bridges 20 (A) S.R.3021, Newton Hamilton Bridge over 21 Juniata River, Newton Hamilton Borough, 22 Bridge Replacement 5,250,000 23 (Base Construction Allocation - 24 $4,750,000) 25 (Land Allocation - $200,000) 26 (Design and Contingencies - $300,000) 27 Section 49. Monroe County (Reserved). 28 Section 50. Montgomery County (Reserved). 29 Section 51. Montour County (Reserved). 30 Section 52. Northampton County (Reserved). 19910H1959B3288 - 4 -
1 Section 53. Northumberland County (Reserved). 2 Section 54. Perry County (Reserved). 3 Section 55. Philadelphia County (Reserved). 4 Section 56. Pike County (Reserved). 5 Section 57. Potter County (Reserved). 6 Section 58. Schuylkill County (Reserved). 7 Section 59. Snyder County (Reserved). 8 Section 60. Somerset County (Reserved). 9 Section 61. Sullivan County (Reserved). 10 Section 62. Susquehanna County (Reserved). 11 Section 63. Tioga County (Reserved). 12 Section 64. Union County (Reserved). 13 Section 65. Venango County (Reserved). 14 Section 66. Warren County (Reserved). 15 Section 67. Washington County (Reserved). 16 Section 68. Wayne County (Reserved). 17 Section 69. Westmoreland County (Reserved). 18 Section 70. Wyoming County (Reserved). 19 Section 71. York County (Reserved). 20 SECTION 5. ADAMS COUNTY. <-- 21 (A) LOCAL BRIDGES (RESERVED) 22 (B) STATE BRIDGES 23 (1) S.R.3038, CROOKED CREEK ROAD OVER 24 MARSH CREEK, FRANKLIN TOWNSHIP, BRIDGE 25 REPLACEMENT 885,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $750,000) 28 (LAND ALLOCATION - $10,000) 29 (DESIGN AND CONTINGENCIES - $125,000) 30 (2) S.R.0234, KING STREET OVER BEAVER 19910H1959B3288 - 5 -
1 CREEK, EAST BERLIN BOROUGH, BRIDGE 2 REPLACEMENT 746,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $640,000) 5 (LAND ALLOCATION - $10,000) 6 (DESIGN AND CONTINGENCIES - $96,000) 7 (3) S.R.3005, PUMPING STATION ROAD OVER 8 PLUM CREEK, FREEDOM TOWNSHIP, BRIDGE 9 REPLACEMENT 246,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $212,000) 12 (LAND ALLOCATION - $10,000) 13 (DESIGN AND CONTINGENCIES - $24,000) 14 (4) S.R.2012, BRIDGE OVER ALLOWAY CREEK, 15 MT. JOY AND GERMANY TOWNSHIPS, BRIDGE 16 REPLACEMENT 510,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $436,000) 19 (LAND ALLOCATION - $10,000) 20 (DESIGN AND CONTINGENCIES - $64,000) 21 (5) S.R.4002, BRIDGE OVER GETTYSBURG 22 RAILROAD, BUTLER TOWNSHIP, BRIDGE 23 REPLACEMENT 1,026,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $889,000) 26 (LAND ALLOCATION - $5,000) 27 (DESIGN AND CONTINGENCIES - $132,000) 28 (6) PA.194, BRIDGE OVER TRIBUTARY, BEAVER 29 CREEK, ABBOTTSTOWN BOROUGH, BRIDGE 30 REPLACEMENT 245,000 19910H1959B3288 - 6 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $196,000) 3 (LAND ALLOCATION - $10,000) 4 (DESIGN AND CONTINGENCIES - $39,000) 5 SECTION 6. ALLEGHENY COUNTY. 6 (A) LOCAL BRIDGES 7 (1) WILKINS TOWNSHIP, IVY STREET BRIDGE, 8 BRIDGE REPLACEMENT 175,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $175,000) 11 (2) WILKINS TOWNSHIP, RUSSELL LANE BRIDGE, 12 BRIDGE REPLACEMENT 175,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $175,000) 15 (3) WILKINS TOWNSHIP, BAKER STREET BRIDGE, 16 BRIDGE REPLACEMENT 250,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $250,000) 19 (4) SHALER TOWNSHIP, ANDERSON ROAD BRIDGE 20 NO.11 (WB11), BRIDGE REPLACEMENT 380,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $300,000) 23 (LAND ALLOCATION - $5,000) 24 (DESIGN AND CONTINGENCIES - $75,000) 25 (5) CRESCENT TOWNSHIP, RIVERVIEW ROAD 26 BRIDGE NO.6 (FU06), BRIDGE REPLACEMENT 755,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $650,000) 29 (LAND ALLOCATION - $10,000) 30 (DESIGN AND CONTINGENCIES - $95,000) 19910H1959B3288 - 7 -
1 (6) PITCAIRN BOROUGH, 2ND STREET BRIDGE 2 OVER DIRTY CAMP RUN CENTER AND WALL 3 AVENUES, BRIDGE REPLACEMENT 175,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $175,000) 6 (7) RANKIN BOROUGH, KENMAWR AVENUE BRIDGE, 7 BRIDGE REPLACEMENT 175,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $175,000) 10 (8) WALL BOROUGH, SPRING HILL BRIDGE OVER 11 CONRAIL, WALL AVENUE AND PA. ROUTE 30, 12 BRIDGE REPLACEMENT 2,882,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $2,882,000) 15 (9) BRADDOCK AND NORTH BRADDOCK BOROUGHS, 16 OVERLAND BRIDGE OVER CONRAIL, BRIDGE 17 REPLACEMENT 818,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $818,000) 20 (10) PLEASANT HILLS BOROUGH, PLEASANT 21 HILLS BOULEVARD BRIDGE NO.02, BRIDGE 22 REPLACEMENT 1,000,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $400,000) 25 (LAND ALLOCATION - $500,000) 26 (DESIGN AND CONTINGENCIES - $100,000) 27 (11) EMSWORTH BOROUGH, GIBSON STREET OVER 28 LOWRIES RUN, BRIDGE REPLACEMENT 220,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $200,000) 19910H1959B3288 - 8 -
1 (DESIGN AND CONTINGENCIES - $20,000) 2 (12) WEST VIEW BOROUGH, MARTSOLF AVENUE 3 BRIDGE OVER CENTER AVENUE, BRIDGE 4 REPLACEMENT 660,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $600,000) 7 (DESIGN AND CONTINGENCIES - $60,000) 8 (13) WEST VIEW BOROUGH, RIDGEWOOD AVENUE 9 BRIDGE OVER CENTER AVENUE, BRIDGE 10 REPLACEMENT 660,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $600,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $50,000) 15 (14) BEN AVON BOROUGH, SPRUCE RUN ROAD 16 (NOW ALDER DRIVE AND AVALON BOROUGH 17 BUILDING), BRIDGE REPLACEMENT 70,000 18 (15) BEN AVON BOROUGH, SPRUCE RUN ROAD 19 NEAR BUILDING MILL LUMBER COMPANY, 20 BRIDGE REPLACEMENT 70,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $70,000) 23 (16) EMSWORTH BOROUGH, HERRON AVENUE OVER 24 LOWRIES RUN, BRIDGE REPLACEMENT 560,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $500,000) 27 (LAND ALLOCATION - $10,000) 28 (DESIGN AND CONTINGENCIES - $50,000) 29 (17) CITY OF PITTSBURGH, GREENFIELD AVENUE 30 BRIDGE NO.39, BRIDGE REPLACEMENT 380,000 19910H1959B3288 - 9 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $300,000) 3 (LAND ALLOCATION - $5,000) 4 (DESIGN AND CONTINGENCIES - $75,000) 5 (18) CITY OF PITTSBURGH, CORLISS TUNNEL 6 NO.18, BRIDGE REPLACEMENT 1,575,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $1,400,000) 9 (DESIGN AND CONTINGENCIES - $175,000) 10 (19) CITY OF PITTSBURGH, MISSION STREET 11 BRIDGE EAST NO.60, BRIDGE REPLACEMENT 880,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $800,000) 14 (DESIGN AND CONTINGENCIES - $80,000) 15 (20) CITY OF PITTSBURGH, MISSION STREET 16 BRIDGE WEST NO.60, BRIDGE REPLACEMENT 2,900,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $1,400,000) 19 (DESIGN AND CONTINGENCIES - $1,500,000) 20 (21) CITY OF PITTSBURGH, ACRATA WAY BRIDGE 21 NO.4, BRIDGE REPLACEMENT 1,115,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $1,000,000) 24 (DESIGN AND CONTINGENCIES - $115,000) 25 (22) PORT AUTHORITY OF ALLEGHENY COUNTY, 26 LOWRIES RUN VIADUCT BMS 27 NO.02742900009004, EMSWORTH BRIDGE, 28 BRIDGE REPLACEMENT 126,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $126,000) 19910H1959B3288 - 10 -
1 (23) BETHEL PARK BOROUGH, BROWNSVILLE AND 2 LIBRARY ROADS BRIDGE NO.6 OVER PINEY 3 FORK CREEK, BRIDGE REPLACEMENT 490,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $385,000) 6 (LAND ALLOCATION - $5,000) 7 (DESIGN AND CONTINGENCIES - $100,000) 8 (24) BETHEL PARK BOROUGH, KINGS SCHOOL 9 ROAD BRIDGE (PY02) OVER NORTH BRANCH 10 PINEY FORK, BRIDGE REPLACEMENT 265,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $225,000) 13 (DESIGN AND CONTINGENCIES - $40,000) 14 (25) BETHEL PARK BOROUGH, BETHEL CHURCH 15 ROAD BRIDGE NO.2 OVER GRAESERS' RUN, 16 BRIDGE REPLACEMENT 250,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $200,000) 19 (DESIGN AND CONTINGENCIES - $50,000) 20 (26) UPPER ST. CLAIR TOWNSHIP, PAINTERS' 21 RUN BRIDGE NO.2, BRIDGE REHABILITATION 95,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $75,000) 24 (DESIGN AND CONTINGENCIES - $20,000) 25 (27) UPPER ST. CLAIR TOWNSHIP, PAINTERS' 26 RUN BRIDGE NO.8, BRIDGE REPLACEMENT 290,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $250,000) 29 (DESIGN AND CONTINGENCIES - $40,000) 30 (28) CITY OF PITTSBURGH, MCARDLE VIADUCT 19910H1959B3288 - 11 -
1 NO.2, BRIDGE REHABILITATION 2,526,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $2,246,000) 4 (DESIGN AND CONTINGENCIES - $280,000) 5 (29) SHALER TOWNSHIP, HODIL STREET BRIDGE 6 1,000 FEET NORTHEAST OF THOMPSON RUN 7 ROAD, BRIDGE REPLACEMENT 250,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $200,000) 10 (LAND ALLOCATION - $25,000) 11 (DESIGN AND CONTINGENCIES - $25,000) 12 (B) STATE BRIDGES 13 (1) S.R.2017, INDUSTRY ROAD BRIDGE OVER 14 BOYDS HOLLOW ROAD, ELIZABETH TOWNSHIP, 15 BRIDGE REPLACEMENT 500,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $300,000) 18 (LAND ALLOCATION - $100,000) 19 (DESIGN AND CONTINGENCIES - $100,000) 20 (2) S.R.0019, MARSHALL AVENUE RAMP OVER 21 CHATEAU STREET, CITY OF PITTSBURGH, 22 BRIDGE REHABILITATION 4,120,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $3,700,000) 25 (LAND ALLOCATION - $50,000) 26 (DESIGN AND CONTINGENCIES - $370,000) 27 (3) S.R.0910, INDIANOLA ROAD BRIDGE OVER 28 DEER CREEK, HARMAR TOWNSHIP, BRIDGE 29 REHABILITATION 1,050,000 30 (BASE CONSTRUCTION ALLOCATION - 19910H1959B3288 - 12 -
1 $850,000) 2 (LAND ALLOCATION - $50,000) 3 (DESIGN AND CONTINGENCIES - $150,000) 4 (4) S.R.3001, RAILROAD OVERHEAD OVER 5 MILLERS RUN ROAD, SOUTH FAYETTE 6 TOWNSHIP, BRIDGE REPLACEMENT 300,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $150,000) 9 (LAND ALLOCATION - $50,000) 10 (DESIGN AND CONTINGENCIES - $100,000) 11 (5) S.R.3026, MILLERS RUN ROAD, BRIDGE 12 OVER MILLERS RUN, SOUTH FAYETTE 13 TOWNSHIP, BRIDGE REPLACEMENT 600,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $400,000) 16 (LAND ALLOCATION - $50,000) 17 (DESIGN AND CONTINGENCIES - $150,000) 18 (6) S.R.0366, TARENTUM BRIDGE, TARENTUM 19 BOROUGH AND CITY OF NEW KENSINGTON, 20 BRIDGE PAINTING 3,320,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $3,000,000) 23 (LAND ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $300,000) 25 (7) CRESCENT STREET BRIDGE OVER PINE 26 CREEK, BOROUGH OF ETNA, BRIDGE 27 REPLACEMENT 770,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $654,000) 30 (LAND ALLOCATION - $39,000) 19910H1959B3288 - 13 -
1 (DESIGN AND CONTINGENCIES - $77,000) 2 (8) MONTOUR RAILROAD, TRESTLE OVER 3 BRIGHTWOOD ROAD, BETHEL PARK BOROUGH, 4 BRIDGE REMOVAL 180,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $160,000) 7 (DESIGN AND CONTINGENCIES - $20,000) 8 (9) BRIDGEVILLE/BOWER HILL ROAD, BRIDGE 9 NUMBER 1 OVER MCLAUGHLIN RUN, UPPER ST. 10 CLAIR TOWNSHIP, BRIDGE REPLACEMENT 475,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $380,000) 13 (LAND ALLOCATION - $5,000) 14 (DESIGN AND CONTINGENCIES - $90,000) 15 (10) S.R.0051, BRIDGE OVER LEWIS RUN, 16 JEFFERSON BOROUGH, BRIDGE REPLACEMENT 710,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $600,000) 19 (LAND ALLOCATION - $10,000) 20 (DESIGN AND CONTINGENCIES - $100,000) 21 (11) TURNPIKE RAMP BRIDGE OVER U.S.22, 22 MONROEVILLE BOROUGH, BRIDGE 23 REHABILITATION 109,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $99,000) 26 (DESIGN AND CONTINGENCIES - $10,000) 27 (12) TURNPIKE RAMP BRIDGE OVER U.S.22 28 BUSINESS, MONROEVILLE BOROUGH, BRIDGE 29 REHABILITATION 401,000 30 (BASE CONSTRUCTION ALLOCATION - 19910H1959B3288 - 14 -
1 $365,000) 2 (DESIGN AND CONTINGENCIES - $36,000) 3 (13) WABASH BRIDGE OVER MONONGAHELA RIVER, 4 CITY OF PITTSBURGH, NEW BRIDGE 5 CONSTRUCTION 35,000,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $30,000,000) 8 (LAND ALLOCATION - $2,000,000) 9 (DESIGN AND CONTINGENCIES - $3,000,000) 10 SECTION 7. ARMSTRONG COUNTY. 11 (A) LOCAL BRIDGES 12 (1) WAYNE TOWNSHIP, T-738, COGLER BRIDGE 13 OVER SOUTH FORK PINE CREEK, BRIDGE 14 REPLACEMENT 476,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $421,000) 17 (LAND ALLOCATION - $15,000) 18 (DESIGN AND CONTINGENCIES - $40,000) 19 (2) VALLEY TOWNSHIP, T-590, PINE FURNACE 20 BRIDGE OVER SOUTH FORK PINE CREEK, 21 BRIDGE REPLACEMENT 554,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $499,000) 24 (LAND ALLOCATION - $15,000) 25 (DESIGN AND CONTINGENCIES - $40,000) 26 (3) EAST FRANKLIN TOWNSHIP, T-530, GLADE 27 RUN BRIDGE OVER GLADE RUN, BRIDGE 28 REPLACEMENT 299,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $256,000) 19910H1959B3288 - 15 -
1 (LAND ALLOCATION - $8,000) 2 (DESIGN AND CONTINGENCIES - $35,000) 3 (4) BOGGS TOWNSHIP, T-529, SOUTH FORK PINE 4 CREEK BRIDGE OVER SOUTH FORK PINE 5 CREEK, BRIDGE REPLACEMENT 567,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $512,000) 8 (LAND ALLOCATION - $15,000) 9 (DESIGN AND CONTINGENCIES - $40,000) 10 (5) WASHINGTON TOWNSHIP, T-396, SIMPSON 11 BRIDGE OVER HULING RUN, BRIDGE 12 REPLACEMENT 347,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $302,000) 15 (LAND ALLOCATION - $10,000) 16 (DESIGN AND CONTINGENCIES - $35,000) 17 (6) PLUM CREEK TOWNSHIP, JOHNSTON BRIDGE 18 OVER SOUTH BRANCH PLUM CREEK, BRIDGE 19 REPLACEMENT 470,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $415,000) 22 (LAND ALLOCATION - $10,000) 23 (DESIGN AND CONTINGENCIES - $45,000) 24 (7) PLUM CREEK TOWNSHIP, GASTOWN BRIDGE 25 OVER PLUM CREEK, BRIDGE REPLACEMENT 513,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $463,000) 28 (LAND ALLOCATION - $5,000) 29 (DESIGN AND CONTINGENCIES - $45,000) 30 (B) STATE BRIDGES 19910H1959B3288 - 16 -
1 (1) S.R.4023 BRIDGE OVER LIMESTONE RUN, 2 EAST FRANKLIN TOWNSHIP, BRIDGE 3 CONSTRUCTION 590,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $500,000) 6 (LAND ALLOCATION - $30,000) 7 (DESIGN AND CONTINGENCIES - $60,000) 8 (2) S.R.1040 BRIDGE OVER CONRAIL RAILROAD, 9 KITTANNING BOROUGH, BRIDGE 10 CONSTRUCTION 1,640,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $1,500,000) 13 (LAND ALLOCATION - $40,000) 14 (DESIGN AND CONTINGENCIES - $100,000) 15 (3) S.R.3004, CORNPLANTER RUN BRIDGE OVER 16 CORNPLANTER RUN, SOUTH BUFFALO 17 TOWNSHIP, BRIDGE REPLACEMENT 245,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $200,000) 20 (LAND ALLOCATION - $5,000) 21 (DESIGN AND CONTINGENCIES - $40,000) 22 (4) S.R.4023, TARRTOWN ROAD BRIDGE OVER 23 LIMESTONE RUN, EAST FRANKLIN TOWNSHIP, 24 BRIDGE REPLACEMENT 1,300,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $1,000,000) 27 (LAND ALLOCATION - $100,000) 28 (DESIGN AND CONTINGENCIES - $200,000) 29 SECTION 8. BEAVER COUNTY. 30 (A) LOCAL BRIDGES 19910H1959B3288 - 17 -
1 (1) BEAVER FALLS AND NEW BRIGHTON 2 BOROUGHS, TENTH STREET BRIDGE OVER 3 BEAVER RIVER, BRIDGE REMOVAL 2,000,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $1,980,000) 6 (DESIGN AND CONTINGENCIES - $20,000) 7 (2) ECONOMY BOROUGH, T-606 TEVEBAUGH 8 BRIDGE NO.5 OVER TEVEBAUGH RUN, BRIDGE 9 REPLACEMENT 205,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $143,000) 12 (LAND ALLOCATION - $55,000) 13 (DESIGN AND CONTINGENCIES - $7,000) 14 (3) CITY OF ALIQUIPPA, HOLLYWOOD BRIDGE 15 OVER TRIBUTARY OF LOGTOWN RUN, BRIDGE 16 REPLACEMENT 1,109,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $1,023,000) 19 (DESIGN AND CONTINGENCIES - $86,000) 20 (4) BRIDGEWATER BOROUGH AND BRIGHTON 21 TOWNSHIP, BEAVER HOLLOW ROAD BRIDGE 22 OVER PL&E RAILROAD, BRIDGE REPLACEMENT 8,000,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $7,000,000) 25 (LAND ALLOCATION - $400,000) 26 (DESIGN AND CONTINGENCIES - $600,000) 27 (B) STATE BRIDGES 28 (1) S.R.0060, BEAVER VALLEY EXPRESSWAY 29 OVER BRADY'S RUN ROAD, BRIGHTON 30 TOWNSHIP, BRIDGE REHABILITATION 535,000 19910H1959B3288 - 18 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $500,000) 3 (LAND ALLOCATION - $5,000) 4 (DESIGN AND CONTINGENCIES - $30,000) 5 (2) S.R.0060, VANPORT BRIDGE OVER OHIO 6 RIVER, VANPORT TOWNSHIP, BRIDGE 7 REHABILITATION 2,200,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $2,000,000) 10 (LAND ALLOCATION - $50,000) 11 (DESIGN AND CONTINGENCIES - $150,000) 12 (3) S.R.0051, TAGGERT ROAD BRIDGE OVER 13 CONRAIL, DARLINGTON TOWNSHIP, BRIDGE 14 REPLACEMENT 2,000,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $1,800,000) 17 (LAND ALLOCATION - $100,000) 18 (DESIGN AND CONTINGENCIES - $100,000) 19 (4) S.R.4039, BRIDGE OVER SIX MILE RUN, 20 BRIGHTON TOWNSHIP, BRIDGE REPLACEMENT 200,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $160,000) 23 (LAND ALLOCATION - $10,000) 24 (DESIGN AND CONTINGENCIES - $20,000) 25 (5) S.R.4031 OVER BRADY RUN TRIBUTARY, 26 BRIGHTON TOWNSHIP, BRIDGE REPLACEMENT 212,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $180,000) 29 (LAND ALLOCATION - $10,000) 30 (DESIGN AND CONTINGENCIES - $22,000) 19910H1959B3288 - 19 -
1 (6) S.R.0068, MCKINLEYS RUN BRIDGE OVER 2 MCKINLEYS RUN, ROCHESTER TOWNSHIP, 3 BRIDGE REPLACEMENT 201,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $177,000) 6 (LAND ALLOCATION - $2,000) 7 (DESIGN AND CONTINGENCIES - $22,000) 8 (7) S.R.0168, BEALER RUN, OHIOVILLE 9 BOROUGH, BRIDGE REPLACEMENT 286,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $250,000) 12 (LAND ALLOCATION - $10,000) 13 (DESIGN AND CONTINGENCIES - $26,000) 14 (8) AMBRIDGE - ALIQUIPPA BRIDGE OVER OHIO 15 RIVER, AMBRIDGE AND ALIQUIPPA BOROUGHS, 16 NEW BRIDGE CONSTRUCTION 5,000,000 17 SECTION 9. BEDFORD COUNTY. 18 (A) LOCAL BRIDGES 19 (1) SOUTHAMPTON TOWNSHIP, T-306, TOWNSHIP 20 BRIDGE NO.1 OVER BLACK VALLEY CREEK, 21 BRIDGE REPLACEMENT 360,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $300,000) 24 (LAND ALLOCATION - $10,000) 25 (DESIGN AND CONTINGENCIES - $50,000) 26 (B) STATE BRIDGES (RESERVED) 27 SECTION 10. BERKS COUNTY. 28 (A) LOCAL BRIDGES 29 (1) MARION TOWNSHIP, T-498 SCHARFF ROAD 30 OVER TULPEHOCKEN CREEK, BRIDGE 19910H1959B3288 - 20 -
1 REPLACEMENT 740,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $630,000) 4 (LAND ALLOCATION - $40,000) 5 (DESIGN AND CONTINGENCIES - $70,000) 6 (2) OLEY TOWNSHIP, T-595 YODER ROAD OVER 7 OYSTERVILLE CREEK, BRIDGE REPLACEMENT 250,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $210,000) 10 (LAND ALLOCATION - $10,000) 11 (DESIGN AND CONTINGENCIES - $30,000) 12 (3) WYOMISSING BOROUGH, LAUERS LANE OVER 13 WYOMISSING CREEK, BRIDGE REPLACEMENT 320,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $275,000) 16 (LAND ALLOCATION - $15,000) 17 (DESIGN AND CONTINGENCIES - $30,000) 18 (B) STATE BRIDGES 19 (1) S.R.0222 UNDER S.R.0422, CITY OF 20 READING, BRIDGE REPLACEMENT 163,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $148,000) 23 (DESIGN AND CONTINGENCIES - $15,000) 24 (2) S.R.0222 UNDER S.R.0422, CITY OF 25 READING, BRIDGE REPLACEMENT 262,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $238,000) 28 (DESIGN AND CONTINGENCIES - $24,000) 29 (3) S.R.0501 OVER I-78, BETHEL TOWNSHIP, 30 BRIDGE REPLACEMENT 1,100,000 19910H1959B3288 - 21 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $1,000,000) 3 (DESIGN AND CONTINGENCIES - $100,000) 4 (4) S.R.0422 OVER RAILROAD, CITY OF 5 READING, BRIDGE REPLACEMENT 410,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $372,000) 8 (DESIGN AND CONTINGENCIES - $38,000) 9 (5) S.R.0222 OVER RAILROAD, WEST READING 10 BOROUGH, BRIDGE REPLACEMENT 2,187,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $1,988,000) 13 (DESIGN AND CONTINGENCIES - $199,000) 14 (6) S.R.0422 OVER SCHUYLKILL RIVER, CITY 15 OF READING, BRIDGE REPLACEMENT 2,033,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $1,848,000) 18 (DESIGN AND CONTINGENCIES - $185,000) 19 (7) S.R.0422 OVER RAILROAD, CUMRU 20 TOWNSHIP, BRIDGE REPLACEMENT 527,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $479,000) 23 (DESIGN AND CONTINGENCIES - $48,000) 24 (8) S.R.0422 OVER SCHUYLKILL RIVER, CUMRU 25 TOWNSHIP, BRIDGE REPLACEMENT 1,345,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $1,222,000) 28 (DESIGN AND CONTINGENCIES - $123,000) 29 (9) S.R.2032, HILL CHURCH ROAD OVER A 30 TRIBUTARY OF WEST SWAMP CREEK, BRIDGE 19910H1959B3288 - 22 -
1 REPLACEMENT 215,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $175,000) 4 (LAND ALLOCATION - $20,000) 5 (DESIGN AND CONTINGENCIES - $20,000) 6 SECTION 11. BLAIR COUNTY. 7 (A) LOCAL BRIDGES 8 (1) FRANKSTOWN TOWNSHIP, T-444, FALLING 9 SPRINGS, SOUTH OF CANOE CREEK, BRIDGE 10 REPLACEMENT 270,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $225,000) 13 (LAND ALLOCATION - $20,000) 14 (DESIGN AND CONTINGENCIES - $25,000) 15 (2) LOGAN TOWNSHIP, 14TH AVENUE OVER MILL 16 RUN STEAM, BRIDGE REPLACEMENT 200,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $175,000) 19 (DESIGN AND CONTINGENCIES - $25,000) 20 (3) NORTH WOODBURY TOWNSHIP, T-338, 21 CENTRAL HIGH ROAD NEAR MARTINSBURG 22 DISPOSAL PLANT, BRIDGE REPLACEMENT 90,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $75,000) 25 (LAND ALLOCATION - $10,000) 26 (DESIGN AND CONTINGENCIES - $5,000) 27 (B) STATE BRIDGES 28 (1) S.R.0022, SEGMENT 0350, OFFSET 0000, 29 BERWIND BRIDGE OVER BRUSH RUN, 30 FRANKSTOWN TOWNSHIP, BRIDGE 19910H1959B3288 - 23 -
1 REPLACEMENT 760,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $650,000) 4 (LAND ALLOCATION - $25,000) 5 (DESIGN AND CONTINGENCIES - $85,000) 6 (2) S.R.0036, SEGMENT 0120, OFFSET 0000, 7 NORTH ROARING SPRING BRIDGE OVER HALTER 8 CREEK, TAYLOR TOWNSHIP, BRIDGE 9 REPLACEMENT 950,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $800,000) 12 (LAND ALLOCATION - $50,000) 13 (DESIGN AND CONTINGENCIES - $100,000) 14 (3) S.R.0220, SEGMENT 0190, OFFSET 0000, 15 NEWRY BRIDGE OVER POPLAR RUN, NEWRY 16 BOROUGH, BRIDGE REHABILITATION 750,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $575,000) 19 (LAND ALLOCATION - $100,000) 20 (DESIGN AND CONTINGENCIES - $75,000) 21 (4) S.R.2010, SEGMENT 0010, OFFSET 0643, 22 EAST FREEDOM BRIDGE OVER FRANKSTOWN 23 BRANCH OF JUNIATA RIVER, FREEDOM 24 TOWNSHIP, BRIDGE REPLACEMENT 920,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $790,000) 27 (LAND ALLOCATION - $25,000) 28 (DESIGN AND CONTINGENCIES - $105,000) 29 (5) S.R.2014, SEGMENT 0040, OFFSET 0000, 30 SAM REA BRIDGE OVER THE BEAVERDAM 19910H1959B3288 - 24 -
1 BRANCH OF JUNIATA RIVER, HOLLIDAYSBURG 2 BOROUGH, BRIDGE REHABILITATION 1,210,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $985,000) 5 (LAND ALLOCATION - $100,000) 6 (DESIGN AND CONTINGENCIES - $125,000) 7 (6) S.R.2014, SEGMENT 0070, OFFSET 0000, 8 LOOP BRIDGE OVER THE FRANKSTOWN BRANCH 9 OF THE JUNIATA RIVER, BLAIR TOWNSHIP, 10 BRIDGE REHABILITATION 1,185,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $985,000) 13 (LAND ALLOCATION - $75,000) 14 (DESIGN AND CONTINGENCIES - $125,000) 15 SECTION 12. BRADFORD COUNTY. 16 (A) LOCAL BRIDGES 17 (1) ROME TOWNSHIP, T-748, BRIDGE OF 18 BULLARD CREEK, BRIDGE REPLACEMENT 280,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $240,000) 21 (LAND ALLOCATION - $10,000) 22 (DESIGN AND CONTINGENCIES - $30,000) 23 (2) SHESHEQUIN TOWNSHIP, T-730, BRIDGE 24 NO.26 OVER SPALDING CREEK, BRIDGE 25 REPLACEMENT 263,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $214,000) 28 (LAND ALLOCATION - $10,000) 29 (DESIGN AND CONTINGENCIES - $39,000) 30 (3) WEST BURLINGTON TOWNSHIP, T-328 BRIDGE 19910H1959B3288 - 25 -
1 NO.8 OVER SUGAR CREEK, BRIDGE 2 REPLACEMENT 317,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $260,000) 5 (LAND ALLOCATION - $10,000) 6 (DESIGN AND CONTINGENCIES - $47,000) 7 (4) CANTON TOWNSHIP, T-310, BRIDGE NO.11 8 OVER TOWANDA CREEK, BRIDGE REPLACEMENT 216,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $174,000) 11 (LAND ALLOCATION - $10,000) 12 (DESIGN AND CONTINGENCIES - $32,000) 13 (5) MONROE TOWNSHIP, T-412, BRIDGE NO.20 14 OVER SOUTH BRANCH TOWANDA CREEK, BRIDGE 15 REPLACEMENT 313,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $256,000) 18 (LAND ALLOCATION - $10,000) 19 (DESIGN AND CONTINGENCIES - $47,000) 20 (6) SOUTH CREEK TOWNSHIP, T-78, BRIDGE 21 NO.27 OVER SOUTH CREEK, BRIDGE 22 REPLACEMENT 166,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $131,000) 25 (LAND ALLOCATION - $10,000) 26 (DESIGN AND CONTINGENCIES - $25,000) 27 (7) LEROY TOWNSHIP, T-330, BRIDGE NO.16 28 OVER TOWANDA CREEK, BRIDGE REPLACEMENT 443,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $367,000) 19910H1959B3288 - 26 -
1 (LAND ALLOCATION - $10,000) 2 (DESIGN AND CONTINGENCIES - $66,000) 3 (8) WINDHAM TOWNSHIP, T-760, BRIDGE NO.40 4 OVER WAPPASENING CREEK, BRIDGE 5 REPLACEMENT 468,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $388,000) 8 (LAND ALLOCATION - $10,000) 9 (DESIGN AND CONTINGENCIES - $70,000) 10 (9) WELLS TOWNSHIP, T-751, BRIDGE NO.37 11 OVER BECKWITH CREEK, BRIDGE 12 REPLACEMENT 302,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $247,000) 15 (LAND ALLOCATION - $10,000) 16 (DESIGN AND CONTINGENCIES - $45,000) 17 (10) ROME TOWNSHIP, T-764, BRIDGE NO.44 18 OVER BULLARD CREEK, BRIDGE REPLACEMENT 306,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $250,000) 21 (LAND ALLOCATION - $10,000) 22 (DESIGN AND CONTINGENCIES - $46,000) 23 (11) NORTH TOWANDA TOWNSHIP, T-545, BRIDGE 24 NO.32 OVER SUGAR CREEK, BRIDGE 25 REPLACEMENT 450,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $372,000) 28 (LAND ALLOCATION - $10,000) 29 (DESIGN AND CONTINGENCIES - $68,000) 30 (12) BURLINGTON TOWNSHIP, T-552, BRIDGE 19910H1959B3288 - 27 -
1 NO.6 OVER SUGAR CREEK, BRIDGE 2 REPLACEMENT 454,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $376,000) 5 (LAND ALLOCATION - $10,000) 6 (DESIGN AND CONTINGENCIES - $68,000) 7 (13) LEROY TOWNSHIP, T-320, BRIDGE NO.18 8 OVER TOWANDA CREEK, BRIDGE REPLACEMENT 288,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $235,000) 11 (LAND ALLOCATION - $10,000) 12 (DESIGN AND CONTINGENCIES - $43,000) 13 (B) STATE BRIDGES 14 (1) S.R.3012, TRIBUTARY TO TOWANDA CREEK, 15 CANTON TOWNSHIP, BRIDGE REPLACEMENT 319,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $255,000) 18 (LAND ALLOCATION - $16,000) 19 (DESIGN AND CONTINGENCIES - $48,000) 20 (2) S.R.0220, MURRAY CREEK BRIDGE OVER 21 MURRAY CREEK, ATHENS TOWNSHIP, BRIDGE 22 REPLACEMENT 682,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $546,000) 25 (LAND ALLOCATION - $34,000) 26 (DESIGN AND CONTINGENCIES - $102,000) 27 SECTION 13. BUCKS COUNTY. 28 (A) LOCAL BRIDGES (RESERVED) 29 (B) STATE BRIDGES 30 (1) S.R.0032, RIVER ROAD BRIDGE AT FLEECY 19910H1959B3288 - 28 -
1 DALE ROAD OVER PAUNACUSSING CREEK, 2 SOLEBURY TOWNSHIP, BRIDGE REPLACEMENT 1,100,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $1,000,000) 5 (DESIGN AND CONTINGENCIES - $100,000) 6 (2) S.R.1014, GEIGEL HILL BRIDGE OVER 7 BRANCH OF SWAMP CREEK, TINICUM 8 TOWNSHIP, BRIDGE REHABILITATION 242,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $200,000) 11 (LAND ALLOCATION - $5,000) 12 (DESIGN AND CONTINGENCIES - $37,000) 13 (3) S.R.1016, DELAWARE ROAD BRIDGE OVER 14 PENNSYLVANIA CANAL, RIGELSVILLE 15 BOROUGH, BRIDGE REPLACEMENT 2,133,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $1,688,000) 18 (LAND ALLOCATION - $175,000) 19 (DESIGN AND CONTINGENCIES - $270,000) 20 (4) S.R.2035, RICHLIEW ROAD BRIDGE OVER 21 POQUESSING CREEK, BENSALEM TOWNSHIP, 22 BRIDGE REPLACEMENT 354,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $295,000) 25 (LAND ALLOCATION - $30,000) 26 (DESIGN AND CONTINGENCIES - $29,000) 27 (5) S.R.2095, DARK HOLLOW ROAD BRIDGE OVER 28 NESHAMINY CREEK, BUCKINGHAM TOWNSHIP, 29 BRIDGE REPLACEMENT 926,000 30 (BASE CONSTRUCTION ALLOCATION - 19910H1959B3288 - 29 -
1 $815,000) 2 (LAND ALLOCATION - $30,000) 3 (DESIGN AND CONTINGENCIES - $81,000) 4 (6) S.R.0202, DOYLESTOWN BYPASS, PA.611 TO 5 PA.262, 8 BRIDGES, DOYLESTOWN AND 6 BUCKINGHAM TOWNSHIPS, BRIDGE DECK 7 REHABILITATION 4,000,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $3,800,000) 10 (DESIGN AND CONTINGENCIES - $200,000) 11 (7) S.R.0001, LANGHORNE BYPASS, PA.213 TO 12 PA. TURNPIKE, 5 BRIDGES, BENSALEM AND 13 MIDDLETOWN TOWNSHIPS, BRIDGE DECK 14 REHABILITATION 10,000,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $9,500,000) 17 (DESIGN AND CONTINGENCIES - $500,000) 18 (8) S.R.0152, STATE ROAD BRIDGE OVER 19 SEPTA, WEST ROCKHILL TOWNSHIP, BRIDGE 20 DECK REHABILITATION 500,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $475,000) 23 (DESIGN AND CONTINGENCIES - $25,000) 24 (9) S.R.0212, RICHLANDTOWN ROAD BRIDGE 25 OVER TOHICKON CREEK, QUAKERTOWN, BRIDGE 26 DECK REHABILITATION 510,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $485,000) 29 (DESIGN AND CONTINGENCIES - $25,000) 30 (10) S.R.0611, EASTON ROAD BRIDGE OVER 19910H1959B3288 - 30 -
1 DEEP RUN, BEDMINISTER TOWNSHIP, BRIDGE 2 DECK REHABILITATION 500,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $475,000) 5 (DESIGN AND CONTINGENCIES - $25,000) 6 (11) S.R.0611, EASTON ROAD BRIDGE OVER 7 TOHICKON CREEK, BEDMINISTER TOWNSHIP, 8 BRIDGE DECK REHABILITATION 700,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $665,000) 11 (DESIGN AND CONTINGENCIES - $35,000) 12 (12) S.R.0611, EASTON AND CREAMERY ROADS, 13 TINICUM TOWNSHIP, BRIDGE DECK 14 REHABILITATION 350,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $332,000) 17 (DESIGN AND CONTINGENCIES - $18,000) 18 (13) S.R.2006, NEWPORTVILLE-FALLS ROAD 19 BRIDGE OVER NESHAMINY CREEK, BENSALEM 20 TOWNSHIP, BRIDGE DECK REHABILITATION 1,400,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $1,330,000) 23 (DESIGN AND CONTINGENCIES - $70,000) 24 (14) S.R.2020, BRISTOL/TYBURN ROAD BRIDGE 25 OVER AMTRAK, FALLS TOWNSHIP, BRIDGE 26 DECK REHABILITATION 1,100,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $1,045,000) 29 (DESIGN AND CONTINGENCIES - $55,000) 30 (15) S.R.2020, TYBURN ROAD AT WARNER 19910H1959B3288 - 31 -
1 COMPANY ROAD, FALLS TOWNSHIP, BRIDGE 2 DECK REHABILITATION 600,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $570,000) 5 (DESIGN AND CONTINGENCIES - $30,000) 6 (16) S.R.2020, TYBURN ROAD OVER CONRAIL 7 SPUR, FALLS TOWNSHIP, BRIDGE DECK 8 REHABILITATION 650,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $618,000) 11 (DESIGN AND CONTINGENCIES - $32,000) 12 (17) S.R.2020, TYBURN ROAD AT PENNSYLVANIA 13 AVENUE, FALLS TOWNSHIP, BRIDGE DECK 14 REHABILITATION 450,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $428,000) 17 (DESIGN AND CONTINGENCIES - $22,000) 18 (18) S.R.0513, HULMEVILLE ROAD, BRIDGE 19 OVER A TRIBUTARY OF POQUESSING CREEK, 20 BENSALEM TOWNSHIP, BRIDGE REPLACEMENT 400,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $315,000) 23 (LAND ALLOCATION - $35,000) 24 (DESIGN AND CONTINGENCIES - $50,000) 25 (19) SCHOFIELD COVERED BRIDGE, TYLER STATE 26 PARK, COVERED BRIDGE TRAIL OVER 27 NESMAMINY CREEK, NEWTON TOWNSHIP AND 28 NORTHAMPTON TOWNSHIP, BRIDGE 29 REPLACEMENT 750,000 30 (BASE CONSTRUCTION ALLOCATION - 19910H1959B3288 - 32 -
1 $600,000) 2 (LAND ALLOCATION - $25,000) 3 (DESIGN AND CONTINGENCIES - $125,000) 4 (20) S.R.2002, RADCLIFFE STREET OVER ADAMS 5 HOLLOW CREEK, BRISTOL BOROUGH, BRIDGE 6 REPLACEMENT 335,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $250,000) 9 (LAND ALLOCATION - $50,000) 10 (DESIGN AND CONTINGENCIES - $35,000) 11 SECTION 14. BUTLER COUNTY. 12 (A) LOCAL BRIDGES 13 (1) CITY OF BUTLER, WEST NEW CASTLE STREET 14 BRIDGE OVER SULLIVAN RUN, BRIDGE 15 REPLACEMENT 500,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $420,000) 18 (LAND ALLOCATION - $20,000) 19 (DESIGN AND CONTINGENCIES - $60,000) 20 (2) CITY OF BUTLER, T-362, WEST PENN 21 STREET BRIDGE OVER SULLIVAN RUN, BRIDGE 22 REPLACEMENT 450,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $375,000) 25 (LAND ALLOCATION - $15,000) 26 (DESIGN AND CONTINGENCIES - $60,000) 27 (3) CITY OF BUTLER, T-354, MERCER STREET 28 BRIDGE OVER SULLIVAN RUN, BRIDGE 29 REPLACEMENT 500,000 30 (BASE CONSTRUCTION ALLOCATION - 19910H1959B3288 - 33 -
1 $415,000) 2 (LAND ALLOCATION - $25,000) 3 (DESIGN AND CONTINGENCIES - $60,000) 4 (4) CITY OF BUTLER, T-319, WEST BRADY 5 STREET BRIDGE OVER SULLIVAN RUN, BRIDGE 6 REPLACEMENT 500,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $420,000) 9 (LAND ALLOCATION - $20,000) 10 (DESIGN AND CONTINGENCIES - $60,000) 11 (5) PARKER TOWNSHIP, T-731, JONES BRIDGE 12 OVER NORTH BRANCH BEAR CREEK, BRIDGE 13 REPLACEMENT 585,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $530,000) 16 (LAND ALLOCATION - $15,000) 17 (DESIGN AND CONTINGENCIES - $40,000) 18 (6) ADAMS TOWNSHIP, T-382, GLADE RUN 19 BRIDGE OVER GLADE RUN, BRIDGE 20 REPLACEMENT 520,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $470,000) 23 (DESIGN AND CONTINGENCIES - $15,000) 24 (LAND ALLOCATION - $35,000) 25 (7) DONEGAL TOWNSHIP, T-830, RATTIGAN ROAD 26 BRIDGE, BRIDGE REPLACEMENT 190,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $190,000) 29 (8) DONEGAL TOWNSHIP, T-830, BUFFALO CREEK 30 BRIDGE, BRIDGE REPLACEMENT 270,000 19910H1959B3288 - 34 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $270,000) 3 (9) CLEARFIELD TOWNSHIP, T-664, MCMILLEN 4 BRIDGE OVER LITTLE BUFFALO RUN, BRIDGE 5 REPLACEMENT 420,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $365,000) 8 (LAND ALLOCATION - $15,000) 9 (DESIGN AND CONTINGENCIES - $40,000) 10 (10) WINFIELD TOWNSHIP, T-656, CORNPLANTER 11 ROAD BRIDGE, BRIDGE REPLACEMENT 5,000 12 (BASE CONSTRUCTION ALLOCATION - $5,000) 13 (11) BUTLER TOWNSHIP, SAW MILL RUN BRIDGE, 14 SAW MILL RUN PARK, BRIDGE REPLACEMENT 84,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $84,000) 17 (12) ADAMS TOWNSHIP, T-352, KAUFMAN RUN 18 BRIDGE OVER KAUFMAN RUN, BRIDGE 19 REPLACEMENT 339,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $299,000) 22 (LAND ALLOCATION - $10,000) 23 (DESIGN AND CONTINGENCIES - $30,000) 24 (13) PENN TOWNSHIP, T-380, ANDERSON RUN 25 BRIDGE OVER ANDERSON RUN, BRIDGE 26 REPLACEMENT 269,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $226,000) 29 (LAND ALLOCATION - $8,000) 30 (DESIGN AND CONTINGENCIES - $35,000) 19910H1959B3288 - 35 -
1 (14) ZELIENOPLE BOROUGH, MARKET STREET 2 BRIDGE OVER GLADE RUN, BRIDGE 3 REPLACEMENT 301,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $258,000) 6 (LAND ALLOCATION - $8,000) 7 (DESIGN AND CONTINGENCIES - $35,000) 8 (15) CITY OF BUTLER, WEST NEW CASTLE 9 STREET BRIDGE OVER SULLIVAN RUN, BRIDGE 10 REPLACEMENT 500,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $420,000) 13 (LAND ALLOCATION - $20,000) 14 (DESIGN AND CONTINGENCIES - $60,000) 15 (16) JEFFERSON TOWNSHIP, T-556, THORN 16 CREEK BRIDGE OVER THORN CREEK, BRIDGE 17 REPLACEMENT 251,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $208,000) 20 (LAND ALLOCATION - $8,000) 21 (DESIGN AND CONTINGENCIES - $35,000) 22 (17) JEFFERSON TOWNSHIP, T-579, THORN 23 CREEK BRIDGE OVER THORN CREEK, BRIDGE 24 REPLACEMENT 520,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $470,000) 27 (LAND ALLOCATION - $15,000) 28 (DESIGN AND CONTINGENCIES - $35,000) 29 (B) STATE BRIDGES 30 (1) S.R.0528, EVANS CITY BRIDGE OVER B&O 19910H1959B3288 - 36 -
1 RAILROAD, FORWARD TOWNSHIP, BRIDGE 2 REPLACEMENT 1,480,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $1,400,000) 5 (LAND ALLOCATION - $20,000) 6 (DESIGN AND CONTINGENCIES - $60,000) 7 (2) S.R.0288 OVER CONNOQUENESSING CREEK, 8 ZELIENOPLE BOROUGH, BRIDGE REPLACEMENT 1,380,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $1,300,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $60,000) 13 (3) S.R.3014, SOUTH EVANS CITY BRIDGE OVER 14 WOLFE CREEK, ADAMS TOWNSHIP, BRIDGE 15 REPLACEMENT 570,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $500,000) 18 (LAND ALLOCATION - $20,000) 19 (DESIGN AND CONTINGENCIES - $50,000) 20 (4) S.R.3017 OVER KAUFMAN RUN, ADAMS 21 TOWNSHIP, BRIDGE REPLACEMENT 580,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $500,000) 24 (LAND ALLOCATION - $20,000) 25 (DESIGN AND CONTINGENCIES - $60,000) 26 (5) S.R.3001, LYNDORA VIADUCT OVER 27 CONNOQUENESSING CREEK, CITY OF BUTLER, 28 BRIDGE REPLACEMENT 5,335,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $4,850,000) 19910H1959B3288 - 37 -
1 (DESIGN AND CONTINGENCIES - $485,000) 2 (6) MAIN STREET VIADUCT, ROUTE NO.8 OVER 3 B&LE - B&O RAILROADS, CITY OF BUTLER, 4 BRIDGE REPLACEMENT 23,000,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $10,800,000) 7 LAND ALLOCATION - $700,000) 8 (DESIGN AND CONTINGENCIES - 9 $11,500,000) 10 (7) S.R.0356, WAYNE STREET VIADUCT OVER 11 CONNOQUENESSING CREEK, CITY OF BUTLER, 12 BRIDGE REPLACEMENT 902,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $902,000) 15 (8) MAIN STREET VIADUCT OVER B&LE - B&O 16 RAILROADS, CITY OF BUTLER, BRIDGE 17 REPLACEMENT 980,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $980,000) 20 (9) S.R.0356, WAYNE STREET VIADUCT OVER 21 CONNOQUENESSING CREEK, CITY OF BUTLER, 22 BRIDGE REPLACEMENT 5,150,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $4,800,000) 25 (LAND ALLOCATION - $350,000) 26 (10) S.R.1011, THORNE RUN BRIDGE OVER 27 THORNE RUN, OAKLAND TOWNSHIP, BRIDGE 28 REPLACEMENT 305,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $250,000) 19910H1959B3288 - 38 -
1 (LAND ALLOCATION - $25,000) 2 (DESIGN AND CONTINGENCIES - $30,000) 3 (11) S.R.0108, WOLF RUN BRIDGE OVER WOLF 4 RUN, WORTH TOWNSHIP, BRIDGE 5 REPLACEMENT 1,100,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $1,100,000) 8 (12) S.R.1011, THORNE RUN BRIDGE OVER 9 THORNE RUN, OAKLAND TOWNSHIP, BRIDGE 10 REPLACEMENT 305,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $250,000) 13 (LAND ALLOCATION - $25,000) 14 (DESIGN AND CONTINGENCIES - $30,000) 15 SECTION 15. CAMBRIA COUNTY 16 (A) LOCAL BRIDGES 17 (1) BARR TOWNSHIP, T-496 DUTCH RUN BRIDGE, 18 BRIDGE REPLACEMENT 115,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $100,000) 21 (LAND ALLOCATION - $5,000) 22 (DESIGN AND CONTINGENCIES - $10,000) 23 (2) EAST TAYLOR TOWNSHIP, T-380 HENCHSTONE 24 RUN BRIDGE, BRIDGE REPLACEMENT 115,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $100,000) 27 (LAND ALLOCATION - $5,000) 28 (DESIGN AND CONTINGENCIES - $10,000) 29 (3) CROYLE TOWNSHIP, T-330 CROYLE TOWNSHIP 30 BRIDGE, BRIDGE REPLACEMENT 300,000 19910H1959B3288 - 39 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $300,000) 3 (4) DALE BOROUGH, ANNIE STREET BRIDGE, 4 BRIDGE REPLACEMENT 500,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $500,000) 7 (5) SPANGLER BOROUGH, SOUTH 15TH STREET 8 BRIDGE, BRIDGE REPLACEMENT 100,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $100,000) 11 (6) SPANGLER BOROUGH, SOUTH 7TH STREET 12 BRIDGE, BRIDGE REPLACEMENT 100,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $100,000) 15 (7) CARROLLTOWN BOROUGH, CB-1 CARROLLTOWN 16 TREATMENT PLANT ACCESS ROAD BRIDGE, 17 BRIDGE REPLACEMENT 939,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $939,000) 20 (8) LORAINE BOROUGH, HIGHLAND DRIVE 21 BRIDGE, BRIDGE REPLACEMENT 50,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $50,000) 24 (9) PORTAGE BOROUGH, GELLESPIE AVENUE, 25 TROUT RUN BRIDGE NO.1, BRIDGE 26 REPLACEMENT 422,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $422,000) 29 (10) SPANGLER BOROUGH, SOUTH 15TH STREET 30 BRIDGE OVER FOX RUN, BRIDGE 19910H1959B3288 - 40 -
1 REPLACEMENT 250,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $250,000) 4 (11) PORTAGE TOWNSHIP, CONEMAUGH AVENUE, 5 TROUT RUN BRIDGE NO.3, BRIDGE 6 REPLACEMENT 394,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $394,000) 9 (12) PORTAGE BOROUGH, SONMAN AVENUE, TROUT 10 RUN BRIDGE NO.4, BRIDGE REPLACEMENT 661,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $661,000) 13 (13) PORTAGE BOROUGH, JEFFERSON AVENUE, 14 TROUT RUN BRIDGE NO.2, BRIDGE 15 REPLACEMENT 469,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $469,000) 18 (14) SUSQUEHANNA TOWNSHIP, T-559, ALLPORT 19 BRIDGE NO.5, BRIDGE REPLACEMENT 500,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $500,000) 22 (15) BARR TOWNSHIP, T-548, NORTH SPANGLER 23 BRIDGE NO.4, BRIDGE REPLACEMENT 700,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $700,000) 26 (16) HASTINGS BOROUGH, THIRD AVENUE BRIDGE 27 NO.6, BRIDGE REPLACEMENT 500,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $500,000) 30 (17) ALLEGHENY TOWNSHIP, T-452, WILDWOOD 19910H1959B3288 - 41 -
1 BRIDGE, BRIDGE REPLACEMENT 500,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $500,000) 4 (18) DEAN TOWNSHIP, T-521, DEAN BRIDGE 5 NO.11, BRIDGE REPLACEMENT 500,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $500,000) 8 (19) CLEARFIELD TOWNSHIP, T-517, CHEST 9 CREEK BRIDGE NO.7, BRIDGE REPLACEMENT 500,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $500,000) 12 (20) BLACKLICK TOWNSHIP, T-549, RED MILL 13 BRIDGE NO.1, BRIDGE REPLACEMENT 500,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $500,000) 16 (21) WHITE TOWNSHIP, T-561, VAN ORNER 17 BRIDGE NO.10, BRIDGE REPLACEMENT 500,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $500,000) 20 (B) STATE BRIDGES 21 (1) S.R.0053, NORTH ARMSBURY BRIDGE, 22 GALLITZIN TOWNSHIP, BRIDGE REPLACEMENT 1,018,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $1,018,000) 25 (2) S.R.0053, SOUTH VAN ORMER BRIDGE, 26 READE TOWNSHIP, BRIDGE REPLACEMENT 570,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $570,000) 29 (3) S.R.0053, BRADY RUN BRIDGE, GALLITZIN 30 TOWNSHIP, BRIDGE REPLACEMENT 2,635,000 19910H1959B3288 - 42 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $2,635,000) 3 (4) S.R.0271, MAPLE STREET BRIDGE, CITY OF 4 JOHNSTOWN, BRIDGE REPLACEMENT 2,250,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $2,250,000) 7 (5) S.R.0164, SONMAN RUN BRIDGE, PORTAGE 8 BOROUGH, BRIDGE REPLACEMENT 550,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $550,000) 11 (6) S.R.0240 AND S.R.0219, JUNCTION 12 BRIDGE, SUSQUEHANNA TOWNSHIP, BRIDGE 13 REPLACEMENT 1,170,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $1,170,000) 16 (7) S.R.0253, HOUTZDALE ROAD BRIDGE, READE 17 TOWNSHIP, BRIDGE REPLACEMENT 540,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $540,000) 20 (8) S.R.1001, LORETTA ROAD BRIDGE, 21 ALLEGHENY TOWNSHIP, BRIDGE REPLACEMENT 620,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $620,000) 24 (9) S.R.2014, BRIDGE OVER NORTH BRANCH OF 25 LITTLE CONEMAUGH RUN, MUNSTER TOWNSHIP, 26 BRIDGE REPLACEMENT 555,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $555,000) 29 (10) S.R.4021, BRUBAKERS RUN BRIDGE, 30 HASTINGS BOROUGH, BRIDGE REPLACEMENT 515,000 19910H1959B3288 - 43 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $515,000) 3 (11) S.R.0271, MAPLE STREET BRIDGE OVER 4 LITTLE CONEMAUGH RIVER AND CONRAIL, 5 CITY OF JOHNSTOWN, BRIDGE 6 REHABILITATION 2,225,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $2,000,000) 9 (LAND ALLOCATION - $25,000) 10 (DESIGN AND CONTINGENCIES - $200,000) 11 SECTION 16. CAMERON COUNTY. 12 (A) LOCAL BRIDGES (RESERVED) 13 (B) STATE BRIDGES 14 (1) S.R.0555, HICKS RUN BRIDGE OVER HICKS 15 RUN, GIBSON TOWNSHIP, BRIDGE 16 REPLACEMENT 1,050,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $800,000) 19 (LAND ALLOCATION - $100,000) 20 (DESIGN AND CONTINGENCIES - $150,000) 21 (2) S.R.0555, DRIFTWOOD BRANCH, BRIDGE 22 OVER SIMMAMAHONING CREEK, DRIFTWOOD 23 BOROUGH, BRIDGE REPLACEMENT 2,050,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $1,750,000) 26 (LAND ALLOCATION - $150,000) 27 (DESIGN AND CONTINGENCIES - $150,000) 28 SECTION 17. CARBON COUNTY. 29 (A) LOCAL BRIDGES 30 (1) PENN FOREST TOWNSHIP, T-516, COUNTY 19910H1959B3288 - 44 -
1 BRIDGE NO.12 OVER MUD RUN, BRIDGE 2 REPLACEMENT 240,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $200,000) 5 (LAND ALLOCATION - $10,000) 6 (DESIGN AND CONTINGENCIES - $30,000) 7 (2) EAST PENN TOWNSHIP, T-354 OVER LIZARD 8 CREEK COUNTY BRIDGE NO.6, BRIDGE 9 REPLACEMENT 445,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $390,000) 12 (LAND ALLOCATION - $15,000) 13 (DESIGN AND CONTINGENCIES - $40,000) 14 (3) PENN FOREST TOWNSHIP, T-519, COUNTY 15 BRIDGE NO.11 OVER STONEY CREEK, BRIDGE 16 REPLACEMENT 180,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $140,000) 19 (LAND ALLOCATION - $10,000) 20 (DESIGN AND CONTINGENCIES - $30,000) 21 (4) LOWER TOWANENSING TOWNSHIP, PRINCESS 22 CREEK BRIDGE OVER PRINCESS CREEK, 23 BRIDGE REPLACEMENT 100,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $85,000) 26 (DESIGN AND CONTINGENCIES - $15,000) 27 (5) EAST PENN TOWNSHIP, T-354, KITTANNING 28 BRIDGE NO.6 OVER LIZARD CREEK, BRIDGE 29 REPLACEMENT 445,000 30 (BASE CONSTRUCTION ALLOCATION - 19910H1959B3288 - 45 -
1 $390,000) 2 (LAND ALLOCATION - $15,000) 3 (DESIGN AND CONTINGENCIES - $40,000) 4 (6) PARKER TOWNSHIP, BRIDGE NO.4 OVER 5 QUAKAKE CREEK, BRIDGE REPLACEMENT 132,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $112,000) 8 (DESIGN AND CONTINGENCIES - $20,000) 9 (7) TOWAMENSING TOWNSHIP, T-477, COUNTY 10 BRIDGE NO.16 OVER POHOPOCO CREEK, 11 BRIDGE REPLACEMENT 375,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $325,000) 14 (LAND ALLOCATION - $10,000) 15 (DESIGN AND CONTINGENCIES - $40,000) 16 (8) PENN FOREST TOWNSHIP, T-512, COUNTY 17 BRIDGE NO.13 OVER MUD RUN, BRIDGE 18 REPLACEMENT 220,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $180,000) 21 (LAND ALLOCATION - $10,000) 22 (DESIGN AND CONTINGENCIES - $30,000) 23 (9) TOWANSING TOWNSHIP, T-447, COUNTY 24 BRIDGE NO.16 BIG CREEK BRIDGE OVER 25 POHOPOCO CREEK, BRIDGE REPLACEMENT 425,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $375,000) 28 (LAND ALLOCATION - $10,000) 29 (DESIGN AND CONTINGENCIES - $40,000) 30 (B) STATE BRIDGES 19910H1959B3288 - 46 -
1 (1) S.R.0534 OVER HICKORY RUN, KIDDER 2 TOWNSHIP, BRIDGE REPLACEMENT 202,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $144,000) 5 (LAND ALLOCATION - $29,000) 6 (DESIGN AND CONTINGENCIES - $29,000) 7 (2) S.R.0534 OVER I-80, EAST SIDE BOROUGH, 8 BRIDGE REPLACEMENT 508,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $461,000) 11 (DESIGN AND CONTINGENCIES - $47,000) 12 SECTION 18. CENTRE COUNTY. 13 (A) LOCAL BRIDGES 14 (1) PORT MATILDA BOROUGH, PEDESTRIAN 15 BRIDGE IN PORT MATILDA COMMUNITY PARK 16 OVER PA. ROUTE NO.220, BRIDGE 17 REPLACEMENT 165,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $135,000) 20 (DESIGN AND CONTINGENCIES - $30,000 21 (B) STATE BRIDGES 22 (1) S.R.2008, PENNS CREEK BRIDGE OVER 23 PENNS CREEK, GREGG TOWNSHIP, BRIDGE 24 REPLACEMENT 1,600,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $1,250,000) 27 (LAND ALLOCATION - $150,000) 28 (DESIGN AND CONTINGENCIES - $200,000) 29 (2) S.R.3034, ONE MILE RUN BRIDGE OVER ONE 30 MILE RUN, RUSH TOWNSHIP, BRIDGE 19910H1959B3288 - 47 -
1 REPLACEMENT 500,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $300,000) 4 (LAND ALLOCATION - $100,000) 5 (DESIGN AND CONTINGENCIES - $100,000) 6 (3) S.R.4004, MCCORMICK RUN BRIDGE OVER 7 MCCORMICK RUN, UNION TOWNSHIP, BRIDGE 8 REPLACEMENT 500,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $300,000) 11 (LAND ALLOCATION - $100,000) 12 (DESIGN AND CONTINGENCIES - $100,000) 13 (4) S.R.0970, MOSHANNON CREEK BRIDGE OVER 14 MOSHANNON CREEK, SNOW SHOE TOWNSHIP, 15 BRIDGE REPLACEMENT 1,600,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $1,250,000) 18 (LAND ALLOCATION - $150,000) 19 (DESIGN AND CONTINGENCIES - $200,000) 20 SECTION 19. CHESTER COUNTY. 21 (A) LOCAL BRIDGES 22 (1) WEST GOSHEN TOWNSHIP, SOUTH BOLMAR 23 STREET BRIDGE OVER SEPTA, BRIDGE 24 REPLACEMENT 380,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $300,000) 27 (LAND ALLOCATION - $50,000) 28 (DESIGN AND CONTINGENCIES - $30,000) 29 (B) STATE BRIDGES 30 (1) S.R.0113, UWCHLAN AVENUE BRIDGE OVER 19910H1959B3288 - 48 -
1 U.S.30 BYPASS, EAST CALN TOWNSHIP, 2 BRIDGE DECK REHABILITATION 400,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $380,000) 5 (DESIGN AND CONTINGENCIES - $20,000) 6 (2) S.R.3069, GROVE ROAD OVER BROAD RUN, 7 WEST WHITELAND TOWNSHIP, BRIDGE 8 REPLACEMENT 380,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $300,000) 11 (LAND ALLOCATION - $50,000) 12 (DESIGN AND CONTINGENCIES - $30,000) 13 SECTION 20. CLARION COUNTY. 14 (A) LOCAL BRIDGES (RESERVED) 15 (B) STATE BRIDGES 16 (1) S.R.0066, LIMESTONE RAILROAD OVERPASS 17 OVER PENN CENTRAL RAILROAD, LIMESTONE 18 TOWNSHIP, BRIDGE REPLACEMENT 1,110,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $1,000,000) 21 (LAND ALLOCATION - $10,000) 22 (DESIGN AND CONTINGENCIES - $100,000) 23 SECTION 21. CLEARFIELD COUNTY. 24 (A) LOCAL BRIDGES 25 (1) GRAHAM TOWNSHIP, T-697 OVER MORAVIAN 26 RUN, BRIDGE REPLACEMENT 405,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $360,000) 29 (LAND ALLOCATION - $5,000) 30 (DESIGN AND CONTINGENCIES - $40,000) 19910H1959B3288 - 49 -
1 (B) STATE BRIDGES 2 (1) S.R.0322, ANDERSON CREEK BRIDGE OVER 3 ANDERSON CREEK, UNION TOWNSHIP, BRIDGE 4 REPLACEMENT 1,500,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $1,300,000) 7 (LAND ALLOCATION - $100,000) 8 (DESIGN AND CONTINGENCIES - $100,000) 9 (2) S.R.0219, SOUTH BRADY STREET BRIDGE 10 OVER B&P RAILROAD AND PENTZ RUN, CITY 11 OF DUBOIS, BRIDGE REPLACEMENT 2,050,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $1,775,000) 14 (LAND ALLOCATION - $100,000) 15 (DESIGN AND CONTINGENCIES - $175,000) 16 (3) S.R.0053, BEAVER RUN BRIDGE OVER 17 BEAVER RUN, HOUTZDALE BOROUGH, BRIDGE 18 REPLACEMENT 650,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $450,000) 21 (LAND ALLOCATION - $100,000) 22 (DESIGN AND CONTINGENCIES - $100,000) 23 (4) S.R.0153, BEAVER RUN BRIDGE OVER 24 BEAVER RUN, HOUTZDALE BOROUGH, BRIDGE 25 REPLACEMENT 650,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $450,000) 28 (LAND ALLOCATION - $100,000) 29 (DESIGN AND CONTINGENCIES - $100,000) 30 (5) S.R.2007, GOSS RUN BRIDGE OVER GOSS 19910H1959B3288 - 50 -
1 RUN, BRISBIN BOROUGH, BRIDGE 2 REPLACEMENT 550,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $350,000) 5 (LAND ALLOCATION - $100,000) 6 (DESIGN AND CONTINGENCIES - $100,000) 7 (6) S.R.1050, MOOSE CREEK BRIDGE OVER 8 MOOSE CREEK, CLEARFIELD BOROUGH, BRIDGE 9 REPLACEMENT 850,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $650,000) 12 (LAND ALLOCATION - $100,000) 13 (DESIGN AND CONTINGENCIES - $100,000) 14 (7) S.R.0255, MINE COVER-IN BRIDGE, 15 VILLAGE OF HOLLYWOOD, BRIDGE 16 REPLACEMENT 1,025,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $750,000) 19 (LAND ALLOCATION - $100,000) 20 (DESIGN AND CONTINGENCIES - $175,000) 21 (8) S.R.2029, ROARING RUN BRIDGE OVER 22 ROARING RUN, BRADFORD TOWNSHIP, BRIDGE 23 REPLACEMENT 550,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $350,000) 26 (LAND ALLOCATION - $100,000) 27 (DESIGN AND CONTINGENCIES - $100,000) 28 (9) S.R.3001, CHEST CREEK BRIDGE OVER 29 CHEST CREEK, MAHAFFEY BOROUGH, BRIDGE 30 REPLACEMENT 1,650,000 19910H1959B3288 - 51 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $1,300,000) 3 (LAND ALLOCATION - $150,000) 4 (DESIGN AND CONTINGENCIES - $200,000) 5 (10) S.R.2024, LITTLE LAUREL RUN BRIDGE 6 OVER LITTLE LAUREL RUN, DECATUR 7 TOWNSHIP, BRIDGE REPLACEMENT 650,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $450,000) 10 (LAND ALLOCATION - $100,000) 11 (DESIGN AND CONTINGENCIES - $100,000) 12 (11) S.R.3014, CHEST CREEK BRIDGE OVER 13 CHEST CREEK, CHEST TOWNSHIP, BRIDGE 14 REPLACEMENT 950,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $750,000) 17 (LAND ALLOCATION - $100,000) 18 (DESIGN AND CONTINGENCIES - $100,000) 19 (12) S.R.4018, BENNETTS BRANCH BRIDGE OVER 20 BENNETTS CREEK, HUSTON TOWNSHIP, BRIDGE 21 REPLACEMENT 1,000,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $800,000) 24 (LAND ALLOCATION - $100,000) 25 (DESIGN AND CONTINGENCIES - $100,000) 26 (13) S.R.3007, ORRS RUN BRIDGE OVER ORRS 27 RUN, KNOX TOWNSHIP, BRIDGE REPLACEMENT 550,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $350,000) 30 (LAND ALLOCATION - $100,000) 19910H1959B3288 - 52 -
1 (DESIGN AND CONTINGENCIES - $100,000) 2 SECTION 22. CLINTON COUNTY. 3 (A) LOCAL BRIDGES 4 (1) CHAPMAN TOWNSHIP, OLD ROUTE 120 AT 5 YOUNG WOMENS CREEK NORTH BEND, BRIDGE 6 REPLACEMENT 960,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $854,000) 9 LAND ALLOCATION - $10,000) 10 (DESIGN AND CONTINGENCIES - $96,000) 11 (B) STATE BRIDGES 12 (1) S.R.0477, LONG RUN BRIDGE OVER LONG 13 RUN, LAMAR TOWNSHIP, BRIDGE 14 REPLACEMENT 800,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $600,000) 17 (LAND ALLOCATION - $100,000) 18 (DESIGN AND CONTINGENCIES - $100,000) 19 (2) S.R.0477, FISHING CREEK BRIDGE OVER 20 TRIBUTARY OF FISHING CREEK, GREENE 21 TOWNSHIP, BRIDGE REPLACEMENT 575,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $375,000) 24 (LAND ALLOCATION - $100,000) 25 (DESIGN AND CONTINGENCIES - $100,000) 26 (3) S.R.1016, PINE CREEK BRIDGE OVER PINE 27 CREEK, PINE CREEK TOWNSHIP, BRIDGE 28 REPLACEMENT 3,000,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $2,700,000) 19910H1959B3288 - 53 -
1 (LAND ALLOCATION - $150,000) 2 (DESIGN AND CONTINGENCIES - $150,000) 3 (4) S.R.2009, FISHING CREEK BRIDGE OVER 4 FISHING CREEK, LOGAN TOWNSHIP, BRIDGE 5 REPLACEMENT 650,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $450,000) 8 (LAND ALLOCATION - $100,000) 9 (DESIGN AND CONTINGENCIES - $100,000) 10 (5) S.R.2022, BITNER RUN BRIDGE OVER 11 BITNER RUN, BEECH CREEK TOWNSHIP, 12 BRIDGE REPLACEMENT 650,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $450,000) 15 (LAND ALLOCATION - $100,000) 16 (DESIGN AND CONTINGENCIES - $100,000) 17 (6) S.R.2002, CHERRY RUN BRIDGE OVER 18 CHERRY RUN, PORTER & LOGAN TOWNSHIPS, 19 BRIDGE REPLACEMENT 775,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $575,000) 22 (LAND ALLOCATION - $100,000) 23 (DESIGN AND CONTINGENCIES - $100,000) 24 (7) S.R.2008, LONG RUN BRIDGE OVER LONG 25 RUN, LAMAR TOWNSHIP, BRIDGE 26 REPLACEMENT 600,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $400,000) 29 (LAND ALLOCATION - $100,000) 30 (DESIGN AND CONTINGENCIES - $100,000) 19910H1959B3288 - 54 -
1 (8) S.R.2016, FISHING CREEK BRIDGE OVER 2 FISHING CREEK, MILL HALL BOROUGH, 3 BRIDGE REPLACEMENT 1,600,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $1,250,000) 6 (LAND ALLOCATION - $150,000) 7 (DESIGN AND CONTINGENCIES - $200,000) 8 SECTION 23. COLUMBIA COUNTY. 9 (A) LOCAL BRIDGES 10 (1) BEAVER TOWNSHIP, T-367, BRIDGE OVER 11 CATAWISSA CREEK, BRIDGE REPLACEMENT 1,153,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $980,000) 14 (LAND ALLOCATION - $51,000) 15 (DESIGN AND CONTINGENCIES - $122,000) 16 (2) MAIN TOWNSHIP, T-468, COLUMBIA COUNTY 17 BRIDGE NO.42, BRIDGE OVER CATAWISSA 18 CREEK, BRIDGE REPLACEMENT 1,357,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $1,086,000) 21 (LAND ALLOCATION - $68,000) 22 (DESIGN AND CONTINGENCIES - $203,000) 23 (3) STILLWATER BOROUGH, COLUMBIA COUNTY 24 BRIDGE NO.136 OVER RAVEN CREEK, BRIDGE 25 REPLACEMENT 305,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $252,000) 28 (LAND ALLOCATION - $21,000) 29 (DESIGN AND CONTINGENCIES - $32,000) 30 (4) MAIN TOWNSHIP, T-413, COLUMBIA COUNTY 19910H1959B3288 - 55 -
1 BRIDGE NO.44 OVER CATAWISSA CREEK, 2 BRIDGE REPLACEMENT 990,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $825,000) 5 (LAND ALLOCATION - $53,000) 6 (DESIGN AND CONTINGENCIES - $112,000) 7 (5) MIFFLIN TOWNSHIP, T-678, COLUMBIA 8 COUNTY BRIDGE NO.51 OVER SCOTCH RUN, 9 BRIDGE REPLACEMENT 233,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $189,000) 12 (LAND ALLOCATION - $20,000) 13 (DESIGN AND CONTINGENCIES - $24,000) 14 (6) PINE TOWNSHIP, T-621, COLUMBIA COUNTY 15 BRIDGE NO.85 OVER WEST BRANCH RUN, 16 BRIDGE REPLACEMENT 564,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $287,000) 19 (LAND ALLOCATION - $240,000) 20 (DESIGN AND CONTINGENCIES - $37,000) 21 (7) GREENWOOD TOWNSHIP, T-536, COLUMBIA 22 COUNTY BRIDGE NO.89 OVER LITTLE FISHING 23 CREEK, BRIDGE REPLACEMENT 411,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $343,000) 26 (LAND ALLOCATION - $25,000) 27 (DESIGN AND CONTINGENCIES - $43,000) 28 (8) HEMLOCK TOWNSHIP, T-360, COLUMBIA 29 COUNTY BRIDGE NO.67 OVER LITTLE FISHING 30 CREEK, BRIDGE REPLACEMENT 620,000 19910H1959B3288 - 56 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $525,000) 3 (LAND ALLOCATION - $21,000) 4 (DESIGN AND CONTINGENCIES - $74,000) 5 (9) MIFFLIN TOWNSHIP, T-415, COLUMBIA 6 COUNTY BRIDGE NO.53 OVER SCOTCH RUN, 7 BRIDGE REPLACEMENT 265,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $217,000) 10 (LAND ALLOCATION - $20,000) 11 (DESIGN AND CONTINGENCIES - $28,000) 12 (10) ORANGEVILLE BOROUGH, COLUMBIA COUNTY 13 BRIDGE NO.118 OVER CONNER RACE, BRIDGE 14 REPLACEMENT 440,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $362,000) 17 (LAND ALLOCATION - $26,000) 18 (DESIGN AND CONTINGENCIES - $52,000) 19 (11) CLEVELAND TOWNSHIP, T-317, COLUMBIA 20 COUNTY BRIDGE NO.29 OVER MUSSER RUN, 21 BRIDGE REPLACEMENT 223,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $175,000) 24 (LAND ALLOCATION - $25,000) 25 (DESIGN AND CONTINGENCIES - $23,000) 26 (12) NORTH CENTRE TOWNSHIP, T-503, 27 COLUMBIA COUNTY BRIDGE NO.169 OVER BEAR 28 CREEK, BRIDGE REPLACEMENT 274,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $224,000) 19910H1959B3288 - 57 -
1 (LAND ALLOCATION - $21,000) 2 (DESIGN AND CONTINGENCIES - $29,000) 3 (13) NORTH CENTRE TOWNSHIP, T-481, 4 COLUMBIA COUNTY BRIDGE NO.168 OVER BEAR 5 CREEK, BRIDGE REPLACEMENT 270,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $210,000) 8 (LAND ALLOCATION - $32,000) 9 (DESIGN AND CONTINGENCIES - $28,000) 10 (14) SUGARLOAF TOWNSHIP AND MAIN TOWNSHIP, 11 T-468, BRIDGE OVER CATAWISSA CREEK, 12 BRIDGE REPLACEMENT 1,357,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $1,086,000) 15 (LAND ALLOCATION - $68,000) 16 (DESIGN AND CONTINGENCIES - $203,000) 17 (B) STATE BRIDGES 18 (1) S.R.4001, SEGMENT 0010 OFFSET 0349 19 OVER NORTH SHORE ROAD, SEDA-COG, BRIDGE 20 REPLACEMENT 857,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $686,000) 23 (LAND ALLOCATION - $43,000) 24 (DESIGN AND CONTINGENCIES - $128,000) 25 (2) S.R.1021, SEGMENT 0010 OFFSET 0499 26 OVER LITTLE BEAR CREEK, BRIDGE 27 REPLACEMENT 505,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $380,000) 30 (LAND ALLOCATION - $50,000) 19910H1959B3288 - 58 -
1 (DESIGN AND CONTINGENCIES - $75,000) 2 SECTION 24. CRAWFORD COUNTY. 3 (A) LOCAL BRIDGES 4 (1) OIL CREEK TOWNSHIP, T-928, DUNCAN 5 ROAD, BRIDGE OVER PINE CREEK, BRIDGE 6 REPLACEMENT 570,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $500,000) 9 (LAND ALLOCATION - $20,000) 10 (DESIGN AND CONTINGENCIES - $50,000) 11 (2) EAST FAIRFIELD TOWNSHIP, T-399, 12 GRIFFEN ROAD, BRIDGE OVER LITTLE SUGAR 13 CREEK, BRIDGE REHABILITATION 55,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $50,000) 16 (DESIGN AND CONTINGENCIES - $5,000) 17 (3) WOODCOCK TOWNSHIP, T-652, LEIMBACH 18 ROAD, BRIDGE OVER GRAVEL RUN, BRIDGE 19 REPLACEMENT 570,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $500,000) 22 (LAND ALLOCATION - $20,000) 23 (DESIGN AND CONTINGENCIES - $50,000) 24 (B) STATE BRIDGES 25 (1) S.R.1002, VENANGO/RAILROAD BRIDGE OVER 26 CONRAIL RAILROAD, CAMBRIDGE TOWNSHIP, 27 BRIDGE REPLACEMENT 880,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $800,000) 30 (LAND ALLOCATION - $20,000) 19910H1959B3288 - 59 -
1 (DESIGN AND CONTINGENCIES - $60,000) 2 (2) S.R.2029, HYDETOWN/INDIAN RUN BRIDGE 3 OVER INDIAN RUN, HYDETOWN BOROUGH, 4 BRIDGE REPLACEMENT 260,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $190,000) 7 (LAND ALLOCATION - $20,000) 8 (DESIGN AND CONTINGENCIES - $50,000) 9 (3) S.R.1007, BIDLEY CORNERS OVER FEDERAL 10 RUN, ATHENS TOWNSHIP, BRIDGE 11 REPLACEMENT 320,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $272,000) 14 (LAND ALLOCATION - $16,000) 15 (DESIGN AND CONTINGENCIES - $32,000) 16 (4) S.R.1024 ON LAKE ROAD OVER OIL CREEK, 17 BMS 20102400100354, BLOOMFIELD 18 TOWNSHIP, BRIDGE REPLACEMENT 340,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $289,000) 21 (LAND ALLOCATION - $17,000) 22 (DESIGN AND CONTINGENCIES - $34,000) 23 (5) S.R.4011 ON GRANGE ROAD OVER CUSSEWAGO 24 CREEK, CUSSEWAGO TOWNSHIP, BRIDGE 25 REPLACEMENT 300,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $255,000) 28 (LAND ALLOCATION - $15,000) 29 (DESIGN AND CONTINGENCIES - $30,000) 30 (6) S.R.1033, TEEPLEVILLE OVER MACKEY RUN 19910H1959B3288 - 60 -
1 RICHMOND TOWNSHIP, BRIDGE REPLACEMENT 280,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $238,000) 4 (LAND ALLOCATION - $14,000) 5 (DESIGN AND CONTINGENCIES - $28,000) 6 (7) S.R.0089 ON CHURCH RUN ROAD OVER DOLLY 7 RUN, ROME TOWNSHIP, BRIDGE REPLACEMENT 350,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $297,000) 10 (LAND ALLOCATION - $18,000) 11 (DESIGN AND CONTINGENCIES - $35,000) 12 (8) S.R.4010 ON SPRINGBORO ROAD OVER CARR 13 RUN, SPRING TOWNSHIP, BRIDGE 14 REPLACEMENT 375,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $318,000) 17 (LAND ALLOCATION - $19,000) 18 (DESIGN AND CONTINGENCIES - $38,000) 19 (9) S.R.0618 OVER TRIBUTARY OF INLET RUN, 20 SUMMIT TOWNSHIP, BRIDGE REPLACEMENT 270,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $230,000) 23 (LAND ALLOCATION - $13,000) 24 (DESIGN AND CONTINGENCIES - $27,000) 25 (10) S.R.0006 OVER CONNEAUT CREEK, VERNON 26 TOWNSHIP, BRIDGE REPLACEMENT 420,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $360,000) 29 (LAND ALLOCATION - $20,000) 30 (DESIGN AND CONTINGENCIES - $40,000) 19910H1959B3288 - 61 -
1 SECTION 25. CUMBERLAND COUNTY. 2 (A) LOCAL BRIDGES 3 (1) UPPER ALLEN TOWNSHIP, GETTYSBURG PIKE 4 BRIDGE, SOUTH OF LISBURN ROAD, BRIDGE 5 REPLACEMENT 135,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $100,000) 8 (LAND ALLOCATION - $10,000) 9 (DESIGN AND CONTINGENCIES - $25,000) 10 (2) MECHANICSBURG BOROUGH, MULBERRY DRIVE 11 BRIDGE, BRIDGE REPLACEMENT 135,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $100,000) 14 (LAND ALLOCATION - $10,000) 15 (DESIGN AND CONTINGENCIES - $25,000) 16 (3) MECHANICSBURG BOROUGH, CHURCH ROAD AT 17 MULBERRY OVER TRINDLE SPRINGS, BRIDGE 18 REPLACEMENT 135,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $100,000) 21 (LAND ALLOCATION - $10,000) 22 (DESIGN AND CONTINGENCIES - $25,000) 23 (4) LOWER ALLEN TOWNSHIP, SPANGLER ROAD 24 BRIDGE OVER CONRAIL, BRIDGE 25 REPLACEMENT 825,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $675,000) 28 (LAND ALLOCATION - $25,000) 29 (DESIGN AND CONTINGENCIES - $125,000) 30 (5) SOUTHAMPTON TOWNSHIP, T-307, 19910H1959B3288 - 62 -
1 FOGELSONGER ROAD BRIDGE OVER BURD RUN, 2 BRIDGE REPLACEMENT 380,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $300,000) 5 (LAND ALLOCATION - $20,000) 6 (DESIGN AND CONTINGENCIES - $60,000) 7 (6) SOUTHAMPTON TOWNSHIP, T-314, WITMER 8 ROAD BRIDGE OVER YELLOW BREECHES CREEK, 9 BRIDGE REPLACEMENT 140,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $90,000) 12 (LAND ALLOCATION - $10,000) 13 (DESIGN AND CONTINGENCIES - $40,000) 14 (7) SOUTHAMPTON TOWNSHIP, T-319, GUTSHALL 15 ROAD BRIDGE OVER YELLOW BREECHES CREEK, 16 BRIDGE REPLACEMENT 135,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $90,000) 19 (LAND ALLOCATION - $5,000) 20 (DESIGN AND CONTINGENCIES - $40,000) 21 (B) STATE BRIDGES 22 (1) S.R.4021, BLOSERVILLE ROAD OVER 23 CONODOQUINET CREEK, UPPER FRANKFORD 24 TOWNSHIP, BRIDGE REPLACEMENT 821,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $732,000) 27 (LAND ALLOCATION - $26,000) 28 (DESIGN AND CONTINGENCIES - $63,000) 29 (2) S.R.0011 AND 0015, 3 BRIDGES OVER THE 30 HARRISBURG EXPRESSWAY, CONRAIL AND 19910H1959B3288 - 63 -
1 GETTYSBURG ROAD, CAMP HILL BOROUGH, 2 EAST PENNSBORO AND LOWER ALLEN 3 TOWNSHIPS, BRIDGE REHABILITATION 6,690,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $5,600,000) 6 (LAND ALLOCATION - $250,000) 7 (DESIGN AND CONTINGENCIES - $840,000) 8 SECTION 26. DAUPHIN COUNTY. 9 (A) LOCAL BRIDGES 10 (1) HALIFAX TOWNSHIP, T-563, COUNTY BRIDGE 11 NO.10, RIDGE ROAD OVER ARMSTRONG CREEK, 12 BRIDGE REPLACEMENT 197,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $170,000) 15 (LAND ALLOCATION - $10,000) 16 (DESIGN AND CONTINGENCIES - $17,000) 17 (2) JEFFERSON TOWNSHIP, T-551, COUNTY 18 BRIDGE NO.13, BACK ROAD OVER SOUTH FORK 19 OF POWELLS CREEK, BRIDGE REPLACEMENT 305,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $235,000) 22 (LAND ALLOCATION - $10,0000) 23 (DESIGN AND CONTINGENCIES - $60,000) 24 (3) MIDDLE PAXTON TOWNSHIP, T-304, COUNTY 25 BRIDGE NO.23, RED HILL ROAD OVER CLARKS 26 CREEK, BRIDGE REPLACEMENT 300,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $250,000) 29 (LAND ALLOCATION - $10,000) 30 (DESIGN AND CONTINGENCIES - $40,000) 19910H1959B3288 - 64 -
1 (4) MIDDLE PAXTON TOWNSHIP, T-686, COUNTY 2 BRIDGE NO.22, SINGER LANE OVER STONEY 3 CREEK, BRIDGE REPLACEMENT 449,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $373,000) 6 (LAND ALLOCATION - $10,000) 7 (DESIGN AND CONTINGENCIES - $66,000) 8 (5) REED TOWNSHIP, T-547, COUNTY BRIDGE 9 NO.28, SHOOP FARM BRIDGE OVER POWELLS 10 CREEK, BRIDGE REPLACEMENT 451,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $375,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $66,000) 15 (6) WICONISCO TOWNSHIP, T-707, ARCH STREET 16 BRIDGE OVER WICONISCO CREEK, BRIDGE 17 REPLACEMENT 339,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $294,000) 20 (LAND ALLOCATION - $5,000) 21 (DESIGN AND CONTINGENCIES - $40,000) 22 (7) EAST HANOVER TOWNSHIP, T-001, BRIDGE 23 NO.1 ON JONESTOWN ROAD OVER TRIBUTARY 24 TO SWATARA CREEK, BRIDGE 25 REHABILITATION 150,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $35,000) 28 (LAND ALLOCATION - $5,000) 29 (DESIGN AND CONTINGENCIES - $110,000) 30 (8) EAST HANOVER TOWNSHIP, T-467, BRIDGE 19910H1959B3288 - 65 -
1 NO.2 ON CARLSON ROAD OVER MANADA CREEK, 2 BRIDGE REPLACEMENT 422,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $340,000) 5 (LAND ALLOCATION - $12,000) 6 (DESIGN AND CONTINGENCIES - $70,000) 7 (9) EAST HANOVER TOWNSHIP, T-471, BRIDGE 8 NO.3 ON NORTH MEADOW LANE OVER MANADA 9 CREEK, BRIDGE REPLACEMENT 315,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $60,000) 12 (LAND ALLOCATION - $10,000) 13 (DESIGN AND CONTINGENCIES - $245,000) 14 (10) EAST HANOVER TOWNSHIP, T-001, BRIDGE 15 NO.4 ON JONESTOWN ROAD OVER MANADA 16 CREEK, BRIDGE REHABILITATION 285,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $235,000) 19 (LAND ALLOCATION - $5,000) 20 (DESIGN AND CONTINGENCIES - $45,000) 21 (11) DERRY TOWNSHIP, T-504, PARK BOULEVARD 22 BRIDGE OVER SPRING CREEK, BRIDGE 23 REPLACEMENT 690,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $550,000) 26 (LAND ALLOCATION - $40,000) 27 (DESIGN AND CONTINGENCIES - $100,000) 28 (B) STATE BRIDGES 29 (1) S.R.0325, CLARKS VALLEY ROAD BRIDGE 30 OVER CLARKS CREEK, MIDDLE PAXTON 19910H1959B3288 - 66 -
1 TOWNSHIP, BRIDGE REPLACEMENT 1,050,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $900,000) 4 (LAND ALLOCATION - $25,000) 5 (DESIGN AND CONTINGENCIES - $125,000) 6 (2) S.R.0039, HERSHEY ROAD OVER SWATARA 7 CREEK, SOUTH HANOVER TOWNSHIP, BRIDGE 8 REHABILITATION 476,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $406,000) 11 (LAND ALLOCATION - $10,000) 12 (DESIGN AND CONTINGENCIES - $60,000) 13 (3) S.R.3018, HERR STREET OVER PAXTON 14 CREEK, HARRISBURG CITY, BRIDGE 15 REPLACEMENT 915,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $800,000) 18 (LAND ALLOCATION - $25,000) 19 (DESIGN AND CONTINGENCIES - $90,000) 20 (4) S.R.2026, GREEN HILL ROAD, BRIDGE OVER 21 TRIBUTARY TO BEAVER CREEK, WEST HANOVER 22 TOWNSHIP, BRIDGE REPLACEMENT 60,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $54,000) 25 (DESIGN AND CONTINGENCIES - $6,000) 26 SECTION 27. DELAWARE COUNTY. 27 (A) LOCAL BRIDGES (RESERVED) 28 (B) STATE BRIDGES 29 (1) S.R.0100, CREEK ROAD BRIDGE OVER 30 HARVEY'S RUN, BIRMINGHAM TOWNSHIP, 19910H1959B3288 - 67 -
1 BRIDGE REHABILITATION 285,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $200,000) 4 (LAND ALLOCATION - $50,000) 5 (DESIGN AND CONTINGENCIES - $35,000) 6 (2) S.R.1018, ARDMORE AVENUE BRIDGE OVER 7 SEPTA, HAVERFORD TOWNSHIP, BRIDGE 8 REPLACEMENT 875,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $750,000) 11 (LAND ALLOCATION - $50,000) 12 (DESIGN AND CONTINGENCIES - $75,000) 13 (3) S.R.0001, TOWNSHIP LINE ROAD OVER 14 SEPTA P&W, UPPER DARBY TOWNSHIP, BRIDGE 15 DECK REHABILITATION 225,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $214,000) 18 (DESIGN AND CONTINGENCIES - $11,000) 19 (4) S.R.0452, MARKET STREET BRIDGE OVER 20 AMTRAK, LOWER CHICHESTER TOWNSHIP, 21 BRIDGE REPLACEMENT 6,000,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $5,700,000) 24 (DESIGN AND CONTINGENCIES - $300,000) 25 (5) S.R.0013, MCDADE BOULEVARD, BRIDGE 26 OVER DARBY CREEK, DARBY BOROUGH, BRIDGE 27 REPLACEMENT 1,000,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $815,000) 30 (LAND ALLOCATION - $100,000) 19910H1959B3288 - 68 -
1 (DESIGN AND CONTINGENCIES - $85,000) 2 SECTION 28. ELK COUNTY. 3 (A) LOCAL BRIDGES (RESERVED) 4 (B) STATE BRIDGES 5 (1) S.R.1004 CROOKED CREEK BRIDGE OVER 6 CROOKED CREEK, JONES TOWNSHIP, BRIDGE 7 REPLACEMENT 775,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $575,000) 10 (LAND ALLOCATION - $100,000) 11 (DESIGN AND CONTINGENCIES - $100,000) 12 (2) S.R.0219 ROCKEY RUN BRIDGE OVER ROCKEY 13 RUN, JONES TOWNSHIP, BRIDGE 14 REPLACEMENT 975,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $775,000) 17 (LAND ALLOCATION - $100,000) 18 (DESIGN AND CONTINGENCIES - $100,000) 19 (3) S.R.0219 GALLAGHER RUN BRIDGE OVER 20 GALLAGHER RUN, RIDGWAY BOROUGH, BRIDGE 21 REPLACEMENT 975,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $750,000) 24 (LAND ALLOCATION - $100,000) 25 (DESIGN AND CONTINGENCIES - $125,000) 26 (4) S.R.3002 IRWIN RUN BRIDGE OVER IRWIN 27 RUN, SPRING CREEK TOWNSHIP, BRIDGE 28 REPLACEMENT 600,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $400,000) 19910H1959B3288 - 69 -
1 (LAND ALLOCATION - $100,000) 2 (DESIGN AND CONTINGENCIES - $100,000) 3 (5) S.R.3002 MILLSTONE CREEK BRIDGE OVER 4 MILLSTONE CREEK, MILLSTONE TOWNSHIP, 5 BRIDGE REPLACEMENT 1,200,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $1,000,000) 8 (LAND ALLOCATION - $100,000) 9 (DESIGN AND CONTINGENCIES - $100,000) 10 SECTION 29. ERIE COUNTY. 11 (A) LOCAL BRIDGES 12 (1) CITY OF ERIE, WEST 38TH STREET BRIDGE, 13 BRIDGE REPLACEMENT 312,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $282,000) 16 (DESIGN AND CONTINGENCIES - $30,000) 17 (2) CITY OF ERIE, WEST SOUTH STREET 18 VIADUCT OVER BAY FRONT PARKWAY, BRIDGE 19 REPLACEMENT 4,020,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $3,600,000) 22 (LAND ALLOCATION - $70,000) 23 (DESIGN AND CONTINGENCIES - $350,000) 24 (3) NORTH EAST TOWNSHIP, T-780, BORT ROAD 25 BRIDGE OVER CONRAIL RAILROAD, BRIDGE 26 REPLACEMENT 695,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $604,000) 29 (LAND ALLOCATION - $10,000) 30 (DESIGN AND CONTINGENCIES - $81,000) 19910H1959B3288 - 70 -
1 (4) CONNEAUT TOWNSHIP, T-300 OVER 2 ASHTABULA CREEK, ID NO.25-720303004036, 3 BRIDGE REPLACEMENT 165,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $130,000) 6 (LAND ALLOCATION - $5,000) 7 (DESIGN AND CONTINGENCIES - $30,000) 8 (5) WATERFORD TOWNSHIP, T-463, COVERED 9 BRIDGE OVER LEBEOUF CREEK, ID NO.25- 10 722004634003, BRIDGE REPLACEMENT 450,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $380,000) 13 (LAND ALLOCATION - $20,000) 14 (DESIGN AND CONTINGENCIES - $50,000) 15 (6) CONNEAUT TOWNSHIP, T-360 OVER CONNEAUT 16 CREEK, ID NO.25-720303604035, BRIDGE 17 REPLACEMENT 160,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $125,000) 20 (LAND ALLOCATION - $5,000) 21 (DESIGN AND CONTINGENCIES - $30,000) 22 (7) MCKEAN TOWNSHIP, T-448, SKINNER ROAD 23 OVER ELK CREEK, BRIDGE REPLACEMENT 204,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $164,000) 26 (LAND ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $20,000) 28 (B) STATE BRIDGES 29 (1) S.R.3029 ON WEST ROAD OVER BRANCH 30 TEMPLE CREEK, ELK CREEK TOWNSHIP, 19910H1959B3288 - 71 -
1 BRIDGE REPLACEMENT 251,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $213,000) 4 (LAND ALLOCATION - $13,000) 5 (DESIGN AND CONTINGENCIES - $25,000) 6 (2) S.R.3018 ON TANNERY ROAD OVER 7 INTERSTATE 90, GIRARD TOWNSHIP, BRIDGE 8 REHABILITATION 1,200,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $1,020,000) 11 (LAND ALLOCATION - $60,000) 12 (DESIGN AND CONTINGENCIES - $120,000) 13 (3) S.R.0005 ON EAST LAKE ROAD OVER FOUR 14 MILE CREEK, LAWRENCE PARK TOWNSHIP, 15 BRIDGE REPLACEMENT 350,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $297,000) 18 (LAND ALLOCATION - $18,000) 19 (DESIGN AND CONTINGENCIES - $35,000) 20 (4) S.R.3020 ON WEST ROAD OVER LAMSON RUN, 21 MCKEAN TOWNSHIP, BRIDGE REHABILITATION 240,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $205,000) 24 (LAND ALLOCATION - $10,000) 25 (DESIGN AND CONTINGENCIES - $25,000) 26 (5) S.R.4013 ON DUNN VALLEY ROAD OVER ELK 27 CREEK, BMS 25401300800214, MCKEAN 28 TOWNSHIP, BRIDGE REPLACEMENT 320,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $270,000) 19910H1959B3288 - 72 -
1 (LAND ALLOCATION - $15,000) 2 (DESIGN AND CONTINGENCIES - $35,000) 3 (6) S.R.3008 ON CRANE ROAD OVER TROUT RUN, 4 WASHINGTON TOWNSHIP, BRIDGE 5 REHABILITATION 270,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $229,000) 8 (LAND ALLOCATION - $14,000) 9 (DESIGN AND CONTINGENCIES - $27,000) 10 (7) S.R.3025 ON CONNEAUTTEE VALLEY ROAD 11 OVER CUMMINGS CREEK, WASHINGTON 12 TOWNSHIP, BRIDGE REPLACEMENT 190,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $160,000) 15 (LAND ALLOCATION - $10,000) 16 (DESIGN AND CONTINGENCIES - $20,000) 17 SECTION 30. FAYETTE COUNTY. 18 (A) LOCAL BRIDGES 19 (1) NORTH UNION TOWNSHIP, AUTO AUCTION 20 BRIDGE, OLD ROUTE 51, BRIDGE REMOVAL 117,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $100,000) 23 (LAND ALLOCATION - $5,000) 24 (DESIGN AND CONTINGENCIES - $12,000) 25 (2) NORTH UNION TOWNSHIP, OLD ROUTE 51 26 BRIDGE, NORTH OF AUTO AUCTION, BRIDGE 27 REMOVAL 117,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $100,000) 30 (LAND ALLOCATION - $5,000) 19910H1959B3288 - 73 -
1 (DESIGN AND CONTINGENCIES - $12,000) 2 (B) STATE BRIDGES 3 (1) S.R.0166, FRIENDSHIP HILL BRIDGE OVER 4 GEORGES CREEK, SPRINGHILL AND NICHOLSON 5 TOWNSHIPS, BRIDGE REPLACEMENT 975,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $863,000) 8 (LAND ALLOCATION - $30,000) 9 (DESIGN AND CONTINGENCIES - $82,000) 10 (2) S.R.1037, PITTSBURGH STREET OVER TRUMP 11 RUN, CITY OF CONNELLSVILLE, BRIDGE 12 REPLACEMENT 650,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $575,000) 15 (LAND ALLOCATION - $20,000) 16 (DESIGN AND CONTINGENCIES - $55,000) 17 (3) S.R.1058, ROARING RUN BRIDGE OVER 18 ROARING RUN, DONEGAL TOWNSHIP, BRIDGE 19 REPLACEMENT 580,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $490,000) 22 (LAND ALLOCATION - $40,000) 23 (DESIGN AND CONTINGENCIES - $50,000) 24 (4) S.R.2007, STONY RUN BRIDGE OVER STONY 25 RUN, WHARTON TOWNSHIP, BRIDGE 26 REPLACEMENT 400,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $335,000) 29 (LAND ALLOCATION - $30,000) 30 (DESIGN AND CONTINGENCIES - $35,000) 19910H1959B3288 - 74 -
1 SECTION 31. FOREST COUNTY. 2 (A) LOCAL BRIDGES 3 (1) TIONESTA TOWNSHIP, T-316 ON HEMLOCK 4 ROAD OVER HEMLOCK CREEK, BRIDGE 5 REPLACEMENT 110,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $88,000) 8 (LAND ALLOCATION - $11,000) 9 (DESIGN AND CONTINGENCIES - $11,000) 10 (B) STATE BRIDGES 11 (1) S.R.1003, BLUE JAY CREEK BRIDGE OVER 12 BLUE JAY CREEK, HOWE TOWNSHIP, BRIDGE 13 REPLACEMENT 340,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $280,000) 16 (LAND ALLOCATION - $25,000) 17 (DESIGN AND CONTINGENCIES - $35,000) 18 (2) S.R.4005 ON OLD TRAFFIC ROUTE 62 OVER 19 PRATHER CREEK, HICKORY TOWNSHIP, BRIDGE 20 REPLACEMENT 271,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $230,000) 23 (LAND ALLOCATION - $14,000) 24 (DESIGN AND CONTINGENCIES - $27,000) 25 SECTION 32. FRANKLIN COUNTY. 26 (A) LOCAL BRIDGES (RESERVED) 27 (B) STATE BRIDGES 28 (1) S.R.0016, MEMORIAL BRIDGE UNDER 29 WESTERN MARYLAND RAILROAD, CHAMBERSBURG 30 BOROUGH, OVERPASS WIDENING 700,000 19910H1959B3288 - 75 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $564,000) 3 (LAND ALLOCATION - $68,000) 4 (DESIGN AND CONTINGENCIES - $68,000) 5 SECTION 33. FULTON COUNTY (RESERVED). 6 SECTION 34. GREENE COUNTY. 7 (A) LOCAL BRIDGES 8 (1) RICHHILL TOWNSHIP, ROUTE 356 BRIDGE 9 NO.57 OVER NORTH FORK CREEK, BRIDGE 10 REPLACEMENT 450,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $350,000) 13 (LAND ALLOCATION - $50,000) 14 (DESIGN AND CONTINGENCIES - $50,000) 15 (2) SPRINGHILL TOWNSHIP, ROUTE 345 BRIDGE 16 NO.68 OVER FORK CREEK, BRIDGE 17 REPLACEMENT 550,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $450,000) 20 (LAND ALLOCATION - $50,000) 21 (DESIGN AND CONTINGENCIES - $50,000) 22 (3) PERRY TOWNSHIP, ROUTE 385 BRIDGE NO.7 23 OVER SHANNON RUN, BRIDGE REPLACEMENT 180,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $150,000) 26 (LAND ALLOCATION - $15,000) 27 (DESIGN AND CONTINGENCIES - $15,000) 28 (4) GILMORE TOWNSHIP, ROUTE 379 BRIDGE 29 NO.53 OVER BLOCKHOUSE RUN, BRIDGE 30 REPLACEMENT 180,000 19910H1959B3288 - 76 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $150,000) 3 (LAND ALLOCATION - $15,000) 4 (DESIGN AND CONTINGENCIES - $15,000) 5 (5) PERRY TOWNSHIP, ROUTE 357 BRIDGE NO.8 6 OVER SHANNON RUN, BRIDGE REPLACEMENT 260,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $200,000) 9 (LAND ALLOCATION - $30,000) 10 (DESIGN AND CONTINGENCIES - $30,000) 11 (6) JACKSON TOWNSHIP, ROUTE 447 BRIDGE 12 NO.56 OVER JOB CREEK, BRIDGE 13 REPLACEMENT 260,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $200,000) 16 (LAND ALLOCATION - $30,000) 17 (DESIGN AND CONTINGENCIES - $30,000) 18 (7) MORGAN TOWNSHIP, ROUTE 568 BRIDGE 19 NO.23 OVER RUFF CREEK, BRIDGE 20 REPLACEMENT 12,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $12,000) 23 (8) CUMBERLAND TOWNSHIP, ROUTE 674 BRIDGE 24 NO.10 OVER MUDDY RUN, BRIDGE 25 REPLACEMENT 425,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $325,000) 28 (LAND ALLOCATION - $50,000) 29 (DESIGN AND CONTINGENCIES - $50,000) 30 (9) GREENE TOWNSHIP, ROUTE 604 BRIDGE 19910H1959B3288 - 77 -
1 NO.18 OVER WHITELEY CREEK, BRIDGE 2 REPLACEMENT 12,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $12,000) 5 (10) CARMICHAELS BOROUGH, BRIDGE NO.11 OLD 6 TOWN STREET OVER MUDDY RUN, BRIDGE 7 CONSTRUCTION 12,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $12,000) 10 (11) FREEPORT TOWNSHIP, ROUTE 362 BRIDGE 11 NO.67 OVER FISH CREEK, BRIDGE 12 REPLACEMENT 450,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $350,000) 15 (LAND ALLOCATION - $50,000) 16 (DESIGN AND CONTINGENCIES - $50,000) 17 (12) CENTER TOWNSHIP, ROUTE 469 BRIDGE 18 NO.65 OVER GRINGE RUN, BRIDGE 19 REPLACEMENT 450,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $350,000) 22 (LAND ALLOCATION - $50,000) 23 (DESIGN AND CONTINGENCIES - $50,000) 24 (13) WASHINGTON TOWNSHIP, ROUTE 546 BRIDGE 25 NO.24 OVER RUFF CREEK, BRIDGE 26 REPLACEMENT 12,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $12,000) 29 (14) CENTER TOWNSHIP, ROUTE 487 BRIDGE 30 NO.42 OVER PURSLEY CREEK, BRIDGE 19910H1959B3288 - 78 -
1 REPLACEMENT 12,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $12,000) 4 (15) CENTER TOWNSHIP, ROUTE 424 BRIDGE 5 NO.60 OVER SOUTH FORK OF TEN MILE 6 CREEK, BRIDGE REPLACEMENT 12,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $12,000) 9 (16) WASHINGTON TOWNSHIP, ROUTE 550 BRIDGE 10 NO.27 OVER CRAYNES RUN, BRIDGE 11 REPLACEMENT 400,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $300,000) 14 (LAND ALLOCATION - $50,000) 15 (DESIGN AND CONTINGENCIES - $50,000) 16 (17) WAYNE TOWNSHIP, ROUTE 371 BRIDGE 17 NO.38 OVER HOOVERS RUN, BRIDGE 18 REPLACEMENT 12,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $12,000) 21 (18) CENTER TOWNSHIP, ROUTE 511 BRIDGE 22 NO.43 OVER PURSLEY CREEK, BRIDGE 23 REPLACEMENT 425,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $325,000) 26 (LAND ALLOCATION - $50,000) 27 (DESIGN AND CONTINGENCIES - $50,000) 28 (19) CENTER TOWNSHIP, ROUTE 454 BRIDGE 29 NO.85 OVER HARGUS CREEK, BRIDGE 30 REPLACEMENT 12,000 19910H1959B3288 - 79 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $12,000) 3 (20) RICHHILL TOWNSHIP, ROUTE 346 BRIDGE 4 NO.78 OVER OWENS RUN, BRIDGE 5 REPLACEMENT 425,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $325,000) 8 (LAND ALLOCATION - $50,000) 9 (DESIGN AND CONTINGENCIES - $50,000) 10 (21) WAYNE TOWNSHIP, ROUTE 490 BRIDGE 11 NO.37 OVER ROBERTS RUN, BRIDGE 12 REPLACEMENT 140,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $100,000) 15 (LAND ALLOCATION - $20,000) 16 (DESIGN AND CONTINGENCIES - $20,000) 17 (22) CUMBERLAND TOWNSHIP, T-674, COUNTY 18 BRIDGE NO.10, OVER MUDDY RUN, BRIDGE 19 REPLACEMENT 489,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $443,000) 22 (LAND ALLOCATION - $5,000) 23 (DESIGN AND CONTINGENCIES - $41,000) 24 (B) STATE BRIDGES 25 (1) S.R.0188, COUNTY MAINTENANCE BUILDING, 26 BRIDGE REPLACEMENT 875,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $750,000) 29 (LAND ALLOCATION - $50,000) 30 (DESIGN AND CONTINGENCIES - $75,000) 19910H1959B3288 - 80 -
1 (2) S.R.2016 OVER WHITELEY CREEK, 2 MONONGAHELA TOWNSHIP, BRIDGE 3 REPLACEMENT 550,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $500,000) 6 (DESIGN AND CONTINGENCIES - $50,000) 7 (3) S.R.3001 ENSLOW FORK BRIDGE, RICHHILL 8 TOWNSHIP, BRIDGE REPLACEMENT 450,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $400,000) 11 (DESIGN AND CONTINGENCIES - $50,000) 12 (4) S.R.4033 SWARTZ BRIDGE, WASHINGTON 13 TOWNSHIP, BRIDGE REPLACEMENT 250,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $200,000) 16 (DESIGN AND CONTINGENCIES - $50,000) 17 (5) S.R.0018 TEN MILE CREEK BRIDGE NO.3, 18 BRIDGE REPLACEMENT 550,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $500,000) 21 (DESIGN AND CONTINGENCIES - $50,000) 22 (6) S.R.0088 DUNKARD CREEK BRIDGE, 23 DILLINER, BRIDGE REPLACEMENT 1,150,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $1,000,000) 26 (LAND ALLOCATION - $50,000) 27 (DESIGN AND CONTINGENCIES - $100,000) 28 (7) S.R.0188 SEGMENT 130 OFFSET 1860 TO 29 SEGMENT 130 OFFSET 1933, BELLS BRIDGE, 30 BRIDGE REPLACEMENT 550,000 19910H1959B3288 - 81 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $500,000) 3 (DESIGN AND CONTINGENCIES - $50,000) 4 (8) S.R.0021, TEN MILE CREEK BRIDGE WEST 5 OVER TEN MILE CREEK, CENTER TOWNSHIP, 6 BRIDGE REPLACEMENT 194,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $160,000) 9 (LAND ALLOCATION - $10,000) 10 (DESIGN AND CONTINGENCIES - $24,000) 11 (9) S.R.3009, HOOVER'S RUN BRIDGE OVER 12 HOOVER'S RUN, WAYNE TOWNSHIP, BRIDGE 13 REPLACEMENT 375,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $320,000) 16 (LAND ALLOCATION - $20,000) 17 (DESIGN AND CONTINGENCIES - $35,000) 18 (10) S.R.3013, BELLS RUN BRIDGE OVER BELLS 19 RUN, WAYNE TOWNSHIP, BRIDGE 20 REPLACEMENT 275,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $225,000) 23 (LAND ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $30,000) 25 (11) S.R.3013, BULLDOG RUN BRIDGE OVER 26 LITTLE RUN, WAYNE TOWNSHIP, BRIDGE 27 REPLACEMENT 280,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $230,000) 30 (LAND ALLOCATION - $20,000) 19910H1959B3288 - 82 -
1 (DESIGN AND CONTINGENCIES - $30,000) 2 SECTION 35. HUNTINGDON COUNTY. 3 (A) LOCAL BRIDGES 4 (1) CLAY TOWNSHIP, T-341, WATKINS BRIDGE 5 OVER THREE SPRINGS CREEK, BRIDGE 6 REPLACEMENT 620,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $496,000) 9 (LAND ALLOCATION - $31,000) 10 (DESIGN AND CONTINGENCIES - $93,000) 11 (B) STATE BRIDGES (RESERVED) 12 SECTION 36. INDIANA COUNTY. 13 (A) LOCAL BRIDGES 14 (1) GREEN TOWNSHIP, T-678, DIXON RUN 15 BRIDGE OVER DIXON RUN, BRIDGE 16 REPLACEMENT 258,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $225,000) 19 (LAND ALLOCATION - $8,000) 20 (DESIGN AND CONTINGENCIES - $25,000) 21 (2) CENTER TOWNSHIP, T-680, CORAL BRIDGE 22 OVER TWO LICK CREEK, BRIDGE 23 REPLACEMENT 600,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $480,000) 26 (LAND ALLOCATION - $60,000) 27 (DESIGN AND CONTINGENCIES - $60,000) 28 (3) PLUMVILLE BOROUGH, T-840, PLUMVILLE 29 BRIDGE OVER PLUM CREEK, BRIDGE 30 REPLACEMENT 300,000 19910H1959B3288 - 83 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $240,000) 3 (LAND ALLOCATION - $30,000) 4 (DESIGN AND CONTINGENCIES - $30,000) 5 (4) RAYNE TOWNSHIP, T-611, BRIDGE OVER 6 PINE RUN, BRIDGE REPLACEMENT 250,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $200,000) 9 (LAND ALLOCATION - $25,000) 10 (DESIGN AND CONTINGENCIES - $25,000) 11 (5) GRANT TOWNSHIP, T-851, BRIDGE OVER 12 EAST RUN, BRIDGE REPLACEMENT 250,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $200,000) 15 (LAND ALLOCATION - $25,000) 16 (DESIGN AND CONTINGENCIES - $25,000) 17 (6) BLAIRSVILLE BOROUGH, RANSON ROAD OVER 18 CONRAIL, BRIDGE REPLACEMENT 550,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $500,000) 21 (LAND ALLOCATION - $10,000) 22 (DESIGN AND CONTINGENCIES - $40,000) 23 (7) BLACKLICK TOWNSHIP, T-460, ARCH BRIDGE 24 OVER AULTMANS RUN, BRIDGE REPLACEMENT 243,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $200,000) 27 (LAND ALLOCATION - $8,000) 28 (DESIGN AND CONTINGENCIES - $35,000) 29 (8) BURRELL TOWNSHIP, T-660, BLACKLICK 30 CREEK BRIDGE OVER BLACKLICK CREEK, 19910H1959B3288 - 84 -
1 BRIDGE REPLACEMENT 1,010,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $900,000) 4 (LAND ALLOCATION - $30,000) 5 (DESIGN AND CONTINGENCIES - $80,000) 6 (9) BLACKLICK TOWNSHIP, T-460, MCKEE 7 BRIDGE OVER AULTMANS RUN, BRIDGE 8 REPLACEMENT 288,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $240,000) 11 (LAND ALLOCATION - $8,000) 12 (DESIGN AND CONTINGENCIES - $40,000) 13 (10) BLACKLICK TOWNSHIP, T-660, AULTMANS 14 RUN BRIDGE OVER AULTMANS RUN, BRIDGE 15 REPLACEMENT 301,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $250,000) 18 (LAND ALLOCATION - $8,000) 19 (DESIGN AND CONTINGENCIES - $43,000) 20 (11) SALTSBURG BOROUGH, HIGH STREET BRIDGE 21 OVER DEEP RAVINE, BRIDGE REPLACEMENT 600,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $545,000) 24 (LAND ALLOCATION - $15,000) 25 (DESIGN AND CONTINGENCIES - $40,000) 26 (12) CLYMER BOROUGH, WILSON STREET BRIDGE 27 OVER DIXON RUN, BRIDGE REPLACEMENT 305,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $250,000) 30 (LAND ALLOCATION - $10,000) 19910H1959B3288 - 85 -
1 (DESIGN AND CONTINGENCIES - $45,000) 2 (13) CREEKSIDE BOROUGH, CANEVA STREET 3 MCKEE BRIDGE OVER MCKEE RUN, BRIDGE 4 REPLACEMENT 400,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $352,000) 7 (LAND ALLOCATION - $8,000) 8 (DESIGN AND CONTINGENCIES - $40,000) 9 (14) ADAMS TOWNSHIP, T-382, GLADE RUN 10 BRIDGE OVER GLADE RUN, BRIDGE 11 REPLACEMENT 520,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $470,000) 14 (LAND ALLOCATION - $15,000) 15 (DESIGN AND CONTINGENCIES - $35,000) 16 (15) ARMSTRONG TOWNSHIP, T-414, THOMAS 17 BRIDGE OVER CROOKED CREEK, BRIDGE 18 REPLACEMENT 550,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $465,000) 21 (LAND ALLOCATION - $20,000) 22 (DESIGN AND CONTINGENCIES - $65,000) 23 (B) STATE BRIDGES 24 (1) S.R.3031, AULTMANS RUN BRIDGE OVER 25 AULTMANS RUN, BLACKLICK TOWNSHIP, 26 BRIDGE REPLACEMENT 265,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $220,000) 29 (LAND ALLOCATION - $15,000) 30 (DESIGN AND CONTINGENCIES - $30,000) 19910H1959B3288 - 86 -
1 (2) S.R.0022, BLAIRSVILLE EAST, BURRELL 2 TOWNSHIP, BRIDGE REPLACEMENT 8,910,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $8,710,000) 5 (DESIGN AND CONTINGENCIES - $200,000) 6 (3) S.R.0108, WOLFE RUN BRIDGE OVER WOLFE 7 RUN, WORTH TOWNSHIP, BRIDGE 8 REPLACEMENT 131,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $100,000) 11 (LAND ALLOCATION - $30,000) 12 (DESIGN AND CONTINGENCIES - $1,000) 13 (4) S.R.0022, BLAIRSVILLE EAST, BURRELL 14 TOWNSHIP BRIDGE REPLACEMENT 200,000 15 (DESIGN AND CONTINGENCIES - $200,000) 16 (5) S.R.0259, BOLIVAR BRIDGE OVER 17 CONEMAUGH RIVER, PARKINSON AND BOLIVAR 18 BOROUGHS, BRIDGE REPLACEMENT 550,000 19 (DESIGN AND CONTINGENCIES - $550,000) 20 (6) S.R.3029, WHISKEY RUN BRIDGE OVER 21 WHISKEY RUN, YOUNG TOWNSHIP, BRIDGE 22 REPLACEMENT 503,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $458,000) 25 (LAND ALLOCATION - $5,000) 26 (DESIGN AND CONTINGENCIES - $40,000) 27 SECTION 37. JEFFERSON COUNTY. 28 (A) LOCAL BRIDGES 29 (1) BARNETT TOWNSHIP, T-365, CATHERS RUN 30 BRIDGE OVER CATHERS RUN, BRIDGE 19910H1959B3288 - 87 -
1 REPLACEMENT 435,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $380,000) 4 (LAND ALLOCATION - $10,000) 5 (DESIGN AND CONTINGENCIES - $45,000) 6 (2) ELDRED TOWNSHIP, T-342, MILL CREEK 7 BRIDGE OVER MILL CREEK, BRIDGE 8 REPLACEMENT 360,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $312,000) 11 (LAND ALLOCATION - $8,000) 12 (DESIGN AND CONTINGENCIES - $40,000) 13 (3) ROSE TOWNSHIP, T-567, CODER RUN BRIDGE 14 OVER CODER RUN, BRIDGE REPLACEMENT 405,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $347,000) 17 (LAND ALLOCATION - $8,000) 18 (DESIGN AND CONTINGENCIES - $50,000) 19 (B) STATE BRIDGES 20 (1) S.R.3033, FIVE MILE RUN BRIDGE OVER 21 FIVE MILE RUN, KNOX TOWNSHIP, BRIDGE 22 REPLACEMENT 420,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $370,000) 25 (LAND ALLOCATION - $10,000) 26 (DESIGN AND CONTINGENCIES - $40,000) 27 (2) S.R.3033, SANDY LICK CREEK BRIDGE OVER 28 SANDY LICK CREEK, BROOKVILLE BOROUGH, 29 BRIDGE REPLACEMENT 1,000,000 30 (BASE CONSTRUCTION ALLOCATION - 19910H1959B3288 - 88 -
1 $800,000) 2 (LAND ALLOCATION - $75,000) 3 (DESIGN AND CONTINGENCIES - $125,000) 4 SECTION 38. JUNIATA COUNTY. 5 (A) LOCAL BRIDGES 6 (1) DELAWARE TOWNSHIP, T-405, DELAWARE 7 CREEK BRIDGE, BRIDGE REPLACEMENT 165,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $155,000) 10 (LAND ALLOCATION - $10,000) 11 (B) STATE BRIDGES 12 (1) S.R.0035, BRIDGE OVER CONRAIL, MIFFLIN 13 BOROUGH, BRIDGE REPLACEMENT 1,600,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $1,300,000) 16 (LAND ALLOCATION - $150,000) 17 (DESIGN AND CONTINGENCIES - $150,000) 18 (2) S.R.0035, BRIDGE OVER COCOLAMUS CREEK, 19 MONROE TOWNSHIP, BRIDGE REPLACEMENT 1,300,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $1,000,000) 22 (LAND ALLOCATION - $150,000) 23 (DESIGN AND CONTINGENCIES - $150,000) 24 (3) S.R.0035, BRIDGE OVER COCOLAMUS CREEK, 25 FAYETTE TOWNSHIP, BRIDGE REPLACEMENT 650,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $450,000) 28 (LAND ALLOCATION - $100,000) 29 (DESIGN AND CONTINGENCIES - $100,000) 30 (4) S.R.0075, BRIDGE OVER HUNTER'S CREEK, 19910H1959B3288 - 89 -
1 TURBETT TOWNSHIP, BRIDGE REPLACEMENT 4,200,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $3,500,000) 4 (LAND ALLOCATION - $300,000) 5 (DESIGN AND CONTINGENCIES - $400,000) 6 (5) S.R.0075, BRIDGE OVER TUSCARORA CREEK, 7 TURBETT TOWNSHIP, BRIDGE REPLACEMENT 2,550,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $2,200,000) 10 (LAND ALLOCATION - $150,000) 11 (DESIGN AND CONTINGENCIES - $200,000) 12 (6) S.R.0075, BRIDGE OVER CONRAIL, WALKER 13 TOWNSHIP, BRIDGE REPLACEMENT 3,000,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $2,500,000) 16 (LAND ALLOCATION - $200,000) 17 (DESIGN AND CONTINGENCIES - $300,000) 18 (7) S.R.0235, BRIDGE OVER STONEY RUN, 19 GREENWOOD TOWNSHIP, BRIDGE REPLACEMENT 850,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $650,000) 22 (LAND ALLOCATION - $100,000) 23 (DESIGN AND CONTINGENCIES - $100,000) 24 (8) S.R.0333, BRIDGE OVER TRIBUTARY OF 25 JUNIATA RIVER, TURBETT TOWNSHIP, BRIDGE 26 REPLACEMENT 500,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $300,000) 29 (LAND ALLOCATION - $100,000) 30 (DESIGN AND CONTINGENCIES - $100,000) 19910H1959B3288 - 90 -
1 (9) S.R.1001, BRIDGE OVER LOST RUN, 2 FERMANAGH TOWNSHIP, BRIDGE REPLACEMENT 800,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $600,000) 5 (LAND ALLOCATION - $100,000) 6 (DESIGN AND CONTINGENCIES - $100,000) 7 (10) S.R.1006, BRIDGE OVER HORNING RUN, 8 FERMANAGH TOWNSHIP, BRIDGE REPLACEMENT 725,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $500,000) 11 (LAND ALLOCATION - $100,000) 12 (DESIGN AND CONTINGENCIES - $125,000) 13 (11) S.R.1006, BRIDGE NO.2 OVER HORNING 14 RUN, FERMANAGH TOWNSHIP, BRIDGE 15 REPLACEMENT 725,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $500,000) 18 (LAND ALLOCATION - $100,000) 19 (DESIGN AND CONTINGENCIES - $125,000) 20 (12) S.R.2010, BRIDGE OVER COCOLAMUS 21 CREEK, DELAWARE TOWNSHIP, BRIDGE 22 REPLACEMENT 900,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $675,000) 25 (LAND ALLOCATION - $100,000) 26 (DESIGN AND CONTINGENCIES - $125,000) 27 (13) S.R.2019, BRIDGE OVER CRANES RUN, 28 GREENWOOD TOWNSHIP, BRIDGE REPLACEMENT 650,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $450,000) 19910H1959B3288 - 91 -
1 (LAND ALLOCATION - $100,000) 2 (DESIGN AND CONTINGENCIES - $100,000) 3 (14) S.R.3031, CONNECTOR BRIDGE ACCESS TO 4 S.R.0075, PORT ROYAL BOROUGH, BRIDGE 5 REPLACEMENT 1,125,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $750,000) 8 (LAND ALLOCATION - $200,000) 9 (DESIGN AND CONTINGENCIES - $175,000) 10 SECTION 39. LACKAWANNA COUNTY. 11 (A) LOCAL BRIDGES 12 (1) MAYFIELD BOROUGH, CHESTNUT STREET 13 BRIDGE OVER LACKAWANNA RIVER PI 14 NO.043591229, BRIDGE REPLACEMENT 1,360,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $1,200,000) 17 (LAND ALLOCATION - $10,000) 18 (DESIGN AND CONTINGENCIES - $150,000) 19 (2) ARCHBALD BOROUGH, WAYNE STREET BRIDGE 20 OVER LACKAWANNA RIVER PI NO.043591230, 21 BRIDGE REPLACEMENT 1,520,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $1,350,000) 24 (LAND ALLOCATION - $10,000) 25 (DESIGN AND CONTINGENCIES - $160,000) 26 (3) CITY OF SCRANTON, ASH STREET BRIDGE 27 OVER ROARING BROOK, BRIDGE REPLACEMENT 900,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $800,000) 30 (LAND ALLOCATION - $10,000) 19910H1959B3288 - 92 -
1 (DESIGN AND CONTINGENCIES - $90,000) 2 (4) CITY OF SCRANTON, POCONO N.E.R.R. 3 CULVERT OVER MEADOW BROOK, BRIDGE 4 REPLACEMENT 180,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $150,000) 7 (LAND ALLOCATION - $10,000) 8 (DESIGN AND CONTINGENCIES - $20,000) 9 (B) STATE BRIDGES 10 (1) S.R.0106 OVER FALL BROOK PI 11 NO.043591226, FELL TOWNSHIP, BRIDGE 12 REPLACEMENT 880,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $775,000) 15 (LAND ALLOCATION - $10,000) 16 (DESIGN AND CONTINGENCIES - $95,000) 17 (2) S.R.0106 OVER TUNKHANNOCK CREEK PI 18 NO.043591227, GREENFIELD TOWNSHIP, 19 BRIDGE REPLACEMENT 685,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $600,000) 22 (LAND ALLOCATION - $10,000) 23 (DESIGN AND CONTINGENCIES - $75,000) 24 (3) S.R.0435 OVER CONRAIL RAILROAD PI 25 NO.043591225, ELMHURST TOWNSHIP, BRIDGE 26 REPLACEMENT 4,520,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $4,000,000) 29 (LAND ALLOCATION - $20,000) 30 (DESIGN AND CONTINGENCIES - $500,000) 19910H1959B3288 - 93 -
1 (4) S.R.2016 OVER PONDS CREEK, LEHIGH 2 TOWNSHIP, BRIDGE REPLACEMENT 486,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $425,000) 5 (LAND ALLOCATION - $10,000) 6 (DESIGN AND CONTINGENCIES - $51,000) 7 (5) S.R.0435 OVER S.R.0348 PI 8 NO.043591228, ROARING BROOK TOWNSHIP, 9 BRIDGE REPLACEMENT 750,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $660,000) 12 (LAND ALLOCATION - $ 10,000) 13 (DESIGN AND CONTINGENCIES - $80,000) 14 (6) S.R.0006 OVER BRANCH LEGGETTS CREEK PI 15 NO.04359122, SOUTH ABINGTON TOWNSHIP, 16 BRIDGE REPLACEMENT 1,000,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $884,000) 19 (LAND ALLOCATION - $10,000) 20 (DESIGN AND CONTINGENCIES - $106,000) 21 (7) S.R.2016 OVER STEGMEIR'S POND, LEHIGH 22 TOWNSHIP, BRIDGE REPLACEMENT 221,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $188,000) 25 (LAND ALLOCATION - $10,000) 26 (DESIGN AND CONTINGENCIES - $23,000) 27 (8) S.R.4019 OVER BRANCH LEGGETTS CREEK PI 28 NO.04359128, ABINGTON TOWNSHIP, BRIDGE 29 REPLACEMENT 405,000 30 (BASE CONSTRUCTION ALLOCATION - 19910H1959B3288 - 94 -
1 $353,000) 2 (LAND ALLOCATION - $10,000) 3 (DESIGN AND CONTINGENCIES - $42,000) 4 (9) S.R.0407 OVER ACKERLEY CREEK PI 5 NO.043591207, ABINGTON TOWNSHIP, BRIDGE 6 REPLACEMENT 653,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $574,000) 9 (LAND ALLOCATION - $10,000) 10 (DESIGN AND CONTINGENCIES - $69,000) 11 (10) S.R.1017 OVER CHAPMAN LAKE STREAM PI 12 NO.043591209, SCOTT TOWNSHIP, BRIDGE 13 REPLACEMENT 558,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $489,000) 16 (LAND ALLOCATION - $10,000) 17 (DESIGN AND CONTINGENCIES - $59,000) 18 (11) S.R.1029 OVER HULLS CREEK PI 19 NO.043591210, SCOTT TOWNSHIP, BRIDGE 20 REPLACEMENT 518,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $453,000) 23 (LAND ALLOCATION - $10,000) 24 (DESIGN AND CONTINGENCIES - $55,000) 25 (12) S.R.2004 OVER KELLUM CREEK PI 26 NO.04359121, MADISON TOWNSHIP, BRIDGE 27 REPLACEMENT 335,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $290,000) 30 (LAND ALLOCATION - $10,000) 19910H1959B3288 - 95 -
1 (DESIGN AND CONTINGENCIES - $35,000) 2 (13) S.R.0006 OVER BRANCH OF LEGGETTS 3 CREEK PI NO.043591221, SOUTH ABINGTON 4 TOWNSHIP, BRIDGE REPLACEMENT 778,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $686,000) 7 (LAND ALLOCATION - $10,000) 8 (DESIGN AND CONTINGENCIES - $82,000) 9 (14) S.R.3005 OVER GARDNERS CREEK PI 10 NO.043591215, RANSOM TOWNSHIP, BRIDGE 11 REPLACEMENT 683,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $601,000) 14 (LAND ALLOCATION - $10,000) 15 (DESIGN AND CONTINGENCIES - $72,000) 16 (15) S.R.2016 OVER PONDS CREEK PI 17 NO.043591214, LEHIGH TOWNSHIP, BRIDGE 18 REPLACEMENT 486,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $425,000) 21 (LAND ALLOCATION - $10,000) 22 (DESIGN AND CONTINGENCIES - $51,000) 23 (16) S.R.4032 OVER SUMMIT LAKE CREEK PI 24 NO.043591219, SOUTH ABINGTON TOWNSHIP, 25 BRIDGE REPLACEMENT 425,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $370,000) 28 (LAND ALLOCATION - $10,000) 29 (DESIGN AND CONTINGENCIES - $45,000) 30 (17) S.R.4032 OVER LEGGETTS CREEK PI 19910H1959B3288 - 96 -
1 NO.043591220, SOUTH ABINGTON TOWNSHIP, 2 BRIDGE REPLACEMENT 615,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $540,000) 5 (LAND ALLOCATION - $10,000) 6 (DESIGN AND CONTINGENCIES - $65,000) 7 (18) S.R.0006 OVER S.R.0347 PI 8 NO.043591223, BLAKELY BOROUGH, BRIDGE 9 REPLACEMENT 1,564,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $1,384,000) 12 (LAND ALLOCATION - $20,000) 13 (DESIGN AND CONTINGENCIES - $160,000) 14 (19) S.R.0006 OVER S.R.0107 PI 15 NO.043591223, MAYFIELD BOROUGH, BRIDGE 16 REPLACEMENT 2,054,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $1,825,000) 19 (LAND ALLOCATION - $10,000) 20 (DESIGN AND CONTINGENCIES - $219,000) 21 (20) S.R.0690 OVER VAN BRUNT CREEK PI 22 NO.043591208, MOSCOW BOROUGH, BRIDGE 23 REPLACEMENT 480,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $420,000) 26 (LAND ALLOCATION - $10,000) 27 (DESIGN AND CONTINGENCIES - $50,000) 28 (21) S.R.0006 OVER BRANCH OF LEGGETTS 29 CREEK PI NO.043591206, CLARKS SUMMIT 30 BOROUGH, BRIDGE REPLACEMENT 980,000 19910H1959B3288 - 97 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $866,000) 3 (LAND ALLOCATION - $10,000) 4 (DESIGN AND CONTINGENCIES - $104,000) 5 (22) S.R.3013 OVER LACKAWANNA RIVER PI 6 NO.043583205, OLD FORGE BOROUGH, BRIDGE 7 REPLACEMENT 2,175,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $1,932,000) 10 (LAND ALLOCATION - $10,000) 11 (DESIGN AND CONTINGENCIES - $233,000) 12 (23) S.R.0247 OVER LACKAWANNA RIVER PI 13 NO.043591203, JESSUP BOROUGH, BRIDGE 14 REPLACEMENT 740,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $650,000) 17 (LAND ALLOCATION - $10,000) 18 (DESIGN AND CONTINGENCIES - $80,000) 19 (24) S.R.3017 OVER LACKAWANNA RIVER PI 20 NO.043591216, OLD FORGE BOROUGH, BRIDGE 21 REPLACEMENT 2,193,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $1,949,000) 24 (LAND ALLOCATION - $10,000) 25 (DESIGN AND CONTINGENCIES - $234,000) 26 (25) S.R.3019 OVER BRANCH OF LACKAWANNA 27 RIVER PI NO.043591217, OLD FORGE 28 BOROUGH, BRIDGE REPLACEMENT 537,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $470,000) 19910H1959B3288 - 98 -
1 (LAND ALLOCATION - $10,000) 2 (DESIGN AND CONTINGENCIES - $57,000) 3 (26) S.R.3027 OVER LEGGETTS CREEK PI 4 NO.043589263, CITY OF SCRANTON, BRIDGE 5 REPLACEMENT 906,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $800,000) 8 (LAND ALLOCATION - $10,000) 9 (DESIGN AND CONTINGENCIES - $96,000) 10 (27) S.R.1033 OVER FALL BROOK PI 11 NO.043591211, CITY OF CARBONDALE, 12 BRIDGE REPLACEMENT 702,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $618,000) 15 (LAND ALLOCATION - $10,000) 16 (DESIGN AND CONTINGENCIES - $74,000) 17 (28) S.R.0006 OVER SOUTH BRANCH OF 18 TUNKHANNOCK CREEK PI NO.043591205, 19 LAPLUME TOWNSHIP, BRIDGE REPLACEMENT 1,596,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $1,416,000) 22 (LAND ALLOCATION - $10,000) 23 (DESIGN AND CONTINGENCIES - $170,000) 24 SECTION 40. LANCASTER COUNTY. 25 (A) LOCAL BRIDGES 26 (1) BART TOWNSHIP, T-389, DRYWELLS ROAD 27 OVER MEETINGHOUSE CREEK, BRIDGE 28 REPLACEMENT 420,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $350,000) 19910H1959B3288 - 99 -
1 (LAND ALLOCATION - $10,000) 2 (DESIGN AND CONTINGENCIES - $60,000) 3 (2) EARL TOWNSHIP, T-810, WHITE OAK ROAD 4 OVER BIG CONESTOGA CREEK, BMS 5 36720908100304, BRIDGE REPLACEMENT 585,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $500,000) 8 (LAND ALLOCATION - $10,000) 9 (DESIGN AND CONTINGENCIES - $75,000) 10 (3) EAST EARL TOWNSHIP, T-894, QUARRY ROAD 11 OVER CONESTOGA RIVER, BRIDGE 12 REPLACEMENT 470,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $400,000) 15 (LAND ALLOCATION - $10,000) 16 (DESIGN AND CONTINGENCIES - $60,000) 17 (4) EPHRATA TOWNSHIP, T-648, ROYER ROAD 18 OVER COCALICO CREEK, BRIDGE 19 REPLACEMENT 370,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $300,000) 22 (LAND ALLOCATION - $10,000) 23 (DESIGN AND CONTINGENCIES - $60,000) 24 (5) RAPHO TOWNSHIP, T-364, EBY CHICKIES 25 ROAD OVER BIG CHICKIES CREEK, BRIDGE 26 REPLACEMENT 645,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $550,000) 29 (LAND ALLOCATION - $10,000) 30 (DESIGN AND CONTINGENCIES - $85,000) 19910H1959B3288 - 100 -
1 (6) RAPHO TOWNSHIP, T-875, AUCTION ROAD 2 OVER BIG CHICKIES CREEK, BRIDGE 3 REPLACEMENT 395,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $325,000) 6 (LAND ALLOCATION - $10,000) 7 (DESIGN AND CONTINGENCIES - $60,000) 8 (7) SALISBURY TOWNSHIP, T-487, BUENA VISTA 9 ROAD OVER PEQUEA CREEK, BRIDGE 10 REPLACEMENT 295,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $225,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $60,000) 15 (8) SALISBURY TOWNSHIP, T-904, MOUNT 16 VERNON ROAD OVER PEQUEA CREEK, BRIDGE 17 REPLACEMENT 270,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $200,000) 20 (LAND ALLOCATION - $10,000) 21 (DESIGN AND CONTINGENCIES - $60,000) 22 (9) PEQUEA TOWNSHIP, T-492, CLEARVIEW ROAD 23 BRIDGE OVER GOODS RUN, BRIDGE 24 REPLACEMENT 32,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $25,000) 27 (DESIGN AND CONTINGENCIES - $7,000) 28 (10) PEQUEA TOWNSHIP, T-557, SHIPROCK ROAD 29 BRIDGE OVER SMALL RUN, BRIDGE 30 REPLACEMENT 105,000 19910H1959B3288 - 101 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $90,000) 3 (DESIGN AND CONTINGENCIES - $15,000) 4 (11) PEQUEA TOWNSHIP, T-557, MILLWOOD ROAD 5 BRIDGE OVER GOODS RUN AT INTERSECTION 6 WITH RAWLINSVILLE ROAD, BRIDGE 7 REPLACEMENT 102,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $90,000) 10 (DESIGN AND CONTINGENCIES - $12,000) 11 (12) PEQUEA TOWNSHIP, T-557, INDIAN HILL 12 ROAD BRIDGE OVER GOODS RUN, BRIDGE 13 REPLACEMENT 90,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $80,000) 16 (DESIGN AND CONTINGENCIES - $10,000) 17 (13) CONESTOGA TOWNSHIP, T-418, SPRING RUN 18 ROAD BRIDGE OVER UNNAMED BRANCH OF 19 TRIBUTARY NO.1 OF CONESTOGA CREEK, 20 BRIDGE REPLACEMENT 160,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $130,000) 23 (LAND ALLOCATION - $10,000) 24 (DESIGN AND CONTINGENCIES - $20,000) 25 (14) EAST DRUMORE TOWNSHIP, T-472, MAXWELL 26 BRIDGE ROAD OVER TRIBUTARY TO CONOWINGO 27 CREEK, BRIDGE REPLACEMENT 70,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $60,000) 30 (DESIGN AND CONTINGENCIES - $10,000) 19910H1959B3288 - 102 -
1 (15) BART TOWNSHIP, T-451, LAMPARTER ROAD 2 BRIDGE OVER WEST BRANCH OF OCTORARA 3 CREEK, BRIDGE REPLACEMENT 80,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $69,000) 6 (DESIGN AND CONTINGENCIES - $11,000) 7 (16) LITITZ BOROUGH, EAST LINCOLN AVENUE 8 BRIDGE OVER SANTO DOMINGO CREEK, BRIDGE 9 REPLACEMENT 506,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $440,000) 12 (DESIGN AND CONTINGENCIES - $66,000) 13 (17) EAST HEMPFIELD TOWNSHIP, HOLLAND 14 STREET BRIDGE OVER AMTRAK, BRIDGE 15 REPLACEMENT 350,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $285,000) 18 (DESIGN AND CONTINGENCIES - $65,000) 19 (18) EAST HEMPFIELD TOWNSHIP, CONSTRUCT 20 NEW BRIDGE ON GOOD DRIVE OVER U.S.30, 21 BRIDGE CONSTRUCTION 2,400,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $1,900,000) 24 (LAND ALLOCATION - $150,000) 25 (DESIGN AND CONTINGENCIES - $350,000) 26 (B) STATE BRIDGES 27 (1) S.R.1061, WILLOW STREET OVER TRIBUTARY 28 OF MUDDY CREEK, ADAMSTOWN BOROUGH, 29 BRIDGE REPLACEMENT 663,000 30 (BASE CONSTRUCTION ALLOCATION - 19910H1959B3288 - 103 -
1 $450,000) 2 (LAND ALLOCATION - $55,000) 3 (DESIGN AND CONTINGENCIES - $168,000) 4 (2) S.R.4009, DILLERVILLE ROAD OVER 5 AMTRAK, LANCASTER CITY, BRIDGE 6 REPLACEMENT 2,080,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $1,800,000) 9 (LAND ALLOCATION - $10,000) 10 (DESIGN AND CONTINGENCIES - $270,000) 11 (3) S.R.0272, READING ROAD OVER INDIAN 12 RUN, EPHRATA TOWNSHIP, BRIDGE 13 REPLACEMENT 1,275,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $1,100,000) 16 (LAND ALLOCATION - $25,000) 17 (DESIGN AND CONTINGENCIES - $150,000) 18 (4) S.R.3016, FAIRVIEW ROAD OVER CONRAIL, 19 PROVIDENCE TOWNSHIP, BRIDGE 20 REPLACEMENT 1,605,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $1,388,000) 23 (LAND ALLOCATION - $10,000) 24 (DESIGN AND CONTINGENCIES - $207,000) 25 (5) S.R.3030, CONESTOGA BOULEVARD OVER 26 TRIBUTARY OF CONESTOGA RIVER, CONESTOGA 27 TOWNSHIP, BRIDGE REPLACEMENT 150,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $100,000) 30 (LAND ALLOCATION - $10,000) 19910H1959B3288 - 104 -
1 (DESIGN AND CONTINGENCIES - $40,000) 2 (6) S.R.0222, RAILROAD BRIDGE OVER 3 S.R.0222, PROVIDENCE TOWNSHIP, BRIDGE 4 REMOVAL 300,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $260,000) 7 (LAND ALLOCATION - $10,000) 8 (DESIGN AND CONTINGENCIES - $30,000) 9 (7) S.R.1035, NORTH WATER STREET BRIDGE 10 OVER LITITZ RUN, LITITZ BOROUGH, BRIDGE 11 REPLACEMENT 253,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $220,000) 14 (DESIGN AND CONTINGENCIES - $33,000) 15 (8) S.R.1035, NORTH WATER STREET BRIDGE 16 OVER SANTO DOMINGO CREEK, LITITZ 17 BOROUGH, BRIDGE REPLACEMENT 253,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $220,000) 20 (DESIGN AND CONTINGENCIES - $33,000) 21 SECTION 41. LAWRENCE COUNTY. 22 (A) LOCAL BRIDGES 23 (1) SLIPPERY ROCK TOWNSHIP, T-741, (OLD 24 ROUTE 422) ROSE POINT BRIDGE NO.1 OVER 25 SLIPPERY ROCK CREEK, BRIDGE 26 REPLACEMENT 870,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $800,000) 29 (LAND ALLOCATION - $50,000) 30 (DESIGN AND CONTINGENCIES - $20,000) 19910H1959B3288 - 105 -
1 (2) PLAIN GROVE TOWNSHIP, T-585, CRESS 2 FARM ROAD OVER TRIBUTARY TO TAYLOR RUN, 3 BRIDGE REPLACEMENT 120,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $106,000) 6 (DESIGN AND CONTINGENCIES - $14,000) 7 (3) PLAIN GROVE TOWNSHIP, T-543, RODGERS 8 ROAD OVER JAMESON RUN, BRIDGE 9 REPLACEMENT 184,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $170,000) 12 (DESIGN AND CONTINGENCIES - $14,000) 13 (4) PLAIN GROVE TOWNSHIP, BLACK ROAD OVER 14 TAYLOR RUN, BRIDGE REPLACEMENT 92,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $83,000) 17 (DESIGN AND CONTINGENCIES - $9,000) 18 (5) BRIDGE NO.72080537010 OVER JAMESON 19 RUN, BRIDGE REPLACEMENT 139,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $126,000) 22 (DESIGN AND CONTINGENCIES - $13,000) 23 (6) SCOTT TOWNSHIP, BRIDGE 24 NO.37721004977016, BRIDGE REPLACEMENT 1,141,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $1,027,000) 27 (DESIGN AND CONTINGENCIES - $114,000) 28 (7) BRIDGE NO.37720805851003 EAST OF T-498 29 INTERSECTION, BRIDGE REPLACEMENT 129,000 30 (BASE CONSTRUCTION ALLOCATION - 19910H1959B3288 - 106 -
1 $116,000) 2 (DESIGN AND CONTINGENCIES - $13,000) 3 (8) SLIPPERY ROCK TOWNSHIP, MCCONNELS MILL 4 ROAD OVER SLIPPERY ROCK CREEK, BRIDGE 5 REPLACEMENT 78,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $70,000) 8 (DESIGN AND CONTINGENCIES - $8,000) 9 (9) SCOTT TOWNSHIP, BRIDGE 10 NO.37721004857017, BRIDGE REPLACEMENT 610,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $549,000) 13 (DESIGN AND CONTINGENCIES - $61,000) 14 (10) SLIPPERY ROCK TOWNSHIP, KILDO ROAD 15 BRIDGE OVER UNNAMED STREAM, BRIDGE 16 REPLACEMENT 581,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $523,000) 19 (DESIGN AND CONTINGENCIES - $58,000) 20 (11) BRIDGE NO.37720805431009 NEAR T-508, 21 BRIDGE REPLACEMENT 332,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $299,000) 24 (DESIGN AND CONTINGENCIES - $33,000) 25 (12) PLAIN GROVE TOWNSHIP, REESE ROAD OVER 26 TAYLOR RUN, BRIDGE REPLACEMENT 27 (BASE CONSTRUCTION ALLOCATION - $) 28 (LAND ALLOCATION - $) 29 (DESIGN AND CONTINGENCIES - $) 30 (B) STATE BRIDGES 19910H1959B3288 - 107 -
1 (1) S.R.1012, FREUE MILL ROAD OVER BIG 2 RUN, SLIPPERY ROCK TOWNSHIP, BRIDGE 3 REPLACEMENT 1,210,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $1,150,000) 6 (LAND ALLOCATION - $50,000) 7 (DESIGN AND CONTINGENCIES - $10,000) 8 (2) S.R.1014, PINE CORNERS ROAD OVER I-79, 9 PLAIN GROVE TOWNSHIP, BRIDGE 10 REPLACEMENT 400,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $250,000) 13 (LAND ALLOCATION - $50,000) 14 (DESIGN AND CONTINGENCIES - $100,000) 15 (3) S.R.2028, HILLS HOLLOW ROAD BRIDGE 16 OVER HILL RUN, SLIPPERY ROCK TOWNSHIP, 17 BRIDGE REPLACEMENT 450,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $300,000) 20 (LAND ALLOCATION - $50,000) 21 (DESIGN AND CONTINGENCIES - $100,000) 22 (4) S.R.2030, MOUNTVILLE ROAD BRIDGE OVER 23 SLIPPERY ROCK CREEK, SLIPPERY ROCK & 24 PERRY TOWNSHIPS, BRIDGE REPLACEMENT 400,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $250,000) 27 (LAND ALLOCATION - $50,000) 28 (DESIGN AND CONTINGENCIES - $100,000) 29 (5) S.R.0065, L.R.79, EAST WASHINGTON 30 STREET BRIDGE OVER NOSHANNOCK CREEK, 19910H1959B3288 - 108 -
1 NEW CASTLE CITY, BRIDGE REPLACEMENT 1,650,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $1,525,000) 4 (DESIGN AND CONTINGENCIES - $125,000) 5 (6) S.R.0168, CSX & P&LE UNDERPASS, TAYLOR 6 TOWNSHIP, BRIDGE REPLACEMENT 1,100,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $1,000,000) 9 (DESIGN AND CONTINGENCIES - $100,000) 10 (7) S.R.1016, LIBERTY ROAD BRIDGE OVER 11 TAYLOR RUN, PLAIN GROVE TOWNSHIP, 12 BRIDGE REPLACEMENT 350,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $200,000) 15 (LAND ALLOCATION - $50,000) 16 (DESIGN AND CONTINGENCIES - $100,000) 17 SECTION 42. LEBANON COUNTY. 18 (A) LOCAL BRIDGES 19 (1) NORTH CORNWALL TOWNSHIP T-414, DAIRY 20 ROAD OVER QUITTAPAHILLA CREEK, BRIDGE 21 REPLACEMENT 321,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $251,000) 24 (LAND ALLOCATION - $10,000) 25 (DESIGN AND CONTINGENCIES - $60,000) 26 (2) UNION TOWNSHIP, T-615, RIDGE ROAD OVER 27 TROUT RUN, BRIDGE REPLACEMENT 205,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $135,000) 30 (LAND ALLOCATION - $10,000) 19910H1959B3288 - 109 -
1 (DESIGN AND CONTINGENCIES - $60,000) 2 (B) STATE BRIDGES (RESERVED) 3 SECTION 43. LEHIGH COUNTY. 4 (A) LOCAL BRIDGES 5 (1) WASHINGTON TOWNSHIP, T-787, WEST GANT 6 STREET OVER TROUT CREEK, BRIDGE 7 REPLACEMENT 175,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $135,000) 10 (LAND ALLOCATION - $10,000) 11 (DESIGN AND CONTINGENCIES - $30,000) 12 (2) LOWHILL TOWNSHIP, T-649, NARRIS ROAD 13 BRIDGE NO.1 OVER SWITZER CREEK, BRIDGE 14 REPLACEMENT 145,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $110,000) 17 (LAND ALLOCATION - $10,000) 18 (DESIGN AND CONTINGENCIES - $25,000) 19 (3) WHITEHALL TOWNSHIP, PEACH BOTTOM ROAD 20 OVER SPRING CREEK, BRIDGE REPLACEMENT 190,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $135,000) 23 (LAND ALLOCATION - $25,000) 24 (DESIGN AND CONTINGENCIES - $30,000) 25 (4) WHITEHALL TOWNSHIP, EGGERT ROAD OVER 26 SPRING CREEK, BRIDGE REPLACEMENT 235,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $180,000) 29 (LAND ALLOCATION - $25,000) 30 (DESIGN AND CONTINGENCIES - $30,000) 19910H1959B3288 - 110 -
1 (5) WHITEHALL TOWNSHIP, OVERLOOK LANE OVER 2 SPRING CREEK, BRIDGE REPLACEMENT 215,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $160,000) 5 (LAND ALLOCATION - $25,000) 6 (DESIGN AND CONTINGENCIES - $30,000) 7 (6) WHITEHALL TOWNSHIP, COLUMBIA STREET 8 OVER COPLAY CREEK, BRIDGE REPLACEMENT 385,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $250,000) 11 (LAND ALLOCATION - $100,000) 12 (DESIGN AND CONTINGENCIES - $35,000) 13 (7) LOWHILL TOWNSHIP, T-649, NARRIS ROAD 14 BRIDGE NO.2 OVER SWITZER CREEK, BRIDGE 15 REPLACEMENT 170,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $130,000) 18 (LAND ALLOCATION - $10,000) 19 (DESIGN AND CONTINGENCIES - $30,000) 20 (8) MACUNGIE BOROUGH, HICKORY LANE OVER 21 TRIBUTARY TO SWABIA CREEK, BRIDGE 22 REPLACEMENT 160,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $110,000) 25 (LAND ALLOCATION - $25,000) 26 (DESIGN AND CONTINGENCIES - $25,000) 27 (9) CITY OF ALLENTOWN, UNION BOULEVARD 28 OVER LEHIGH RIVER, BRIDGE REPLACEMENT 5,520,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $5,000,000) 19910H1959B3288 - 111 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $500,000) 3 (10) CITY OF ALLENTOWN, READING ROAD OVER 4 CEDAR CREEK, BRIDGE REPLACEMENT 1,010,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $865,000) 7 (LAND ALLOCATION - $20,000) 8 (DESIGN AND CONTINGENCIES - $125,000) 9 (11) CITY OF ALLENTOWN, WARD STREET (15TH 10 STREET) OVER LITTLE LEHIGH CREEK, 11 BRIDGE REPLACEMENT 3,800,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $3,400,000) 14 (LAND ALLOCATION - $20,000) 15 (DESIGN AND CONTINGENCIES - $380,000) 16 (12) CITY OF ALLENTOWN, 15TH STREET BRIDGE 17 OVER CONRAIL AND LITTLE LEHIGH CREEK, 18 BRIDGE REHABILITATION 750,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $500,000) 21 (LAND ALLOCATION - $100,000 22 (DESIGN AND CONTINGENCIES - $150,000) 23 (13) NORTH WHITEHALL TOWNSHIP, T-687, 24 LEHIGH STREET BRIDGE, BRIDGE 25 REPLACEMENT 150,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $135,000) 28 (DESIGN AND CONTINGENCIES - $15,000) 29 (14) NORTH WHITEHALL TOWNSHIP, T-695, 30 WALNUT STREET BRIDGE NO.1, BRIDGE 19910H1959B3288 - 112 -
1 REHABILITATION 83,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $65,000) 4 (DESIGN AND CONTINGENCIES - $18,000) 5 (15) NORTH WHITEHALL TOWNSHIP, T-695, 6 WALNUT STREET BRIDGE NO.2, BRIDGE 7 REHABILITATION 105,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $85,000) 10 (DESIGN AND CONTINGENCIES - $20,000) 11 (16) NORTH WHITEHALL TOWNSHIP, T-712 12 BRIDGE AT OVERLOOK ROAD AND NEFFS- 13 LAURYS ROAD, BRIDGE REPLACEMENT 141,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $120,000) 16 (DESIGN AND CONTINGENCIES - $21,000) 17 (17) NORTH WHITEHALL TOWNSHIP, T-702, 18 BRIDGE AT RIVERVIEW ROAD AND NEFFS- 19 LAURYS ROAD, BRIDGE REPLACEMENT 118,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $100,000) 22 (DESIGN AND CONTINGENCIES - $18,000) 23 (B) STATE BRIDGES 24 (1) S.R.0145 OVER ABANDONED CONRAIL LINE, 25 WHITEHALL TOWNSHIP, BRIDGE REPLACEMENT 240,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $200,000) 28 (LAND ALLOCATION - $20,000) 29 (DESIGN AND CONTINGENCIES - $20,000) 30 (2) S.R.3001 OVER IRON RUN, LOWER MACUNGIE 19910H1959B3288 - 113 -
1 TOWNSHIP, BRIDGE REPLACEMENT 624,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $480,000) 4 (LAND ALLOCATION - $96,000) 5 (DESIGN AND CONTINGENCIES - $48,000) 6 (3) I-78 OVER IRON RUN, WEISENBERG 7 TOWNSHIP, BRIDGE REPLACEMENT 120,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $100,000) 10 (DESIGN AND CONTINGENCIES - $20,000) 11 (4) S.R.0378 UNDER EASTON AVENUE, CITY OF 12 BETHLEHEM, BRIDGE REPLACEMENT 812,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $738,000) 15 (DESIGN AND CONTINGENCIES - $74,000) 16 (5) S.R.0145 OVER TRIBUTARY TO COPLAY 17 CREEK, WHITEHALL TOWNSHIP, BRIDGE 18 REPLACEMENT 225,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $187,000) 21 (LAND ALLOCATION - $19,000) 22 (DESIGN AND CONTINGENCIES - $19,000) 23 (6) S.R.0378 UNDER CATASAQUA ROAD, CITY OF 24 BETHLEHEM, BRIDGE REPLACEMENT 742,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $674,000) 27 (DESIGN AND CONTINGENCIES - $68,000) 28 (7) S.R.1015 OVER S.R.0022, WHITEHALL 29 TOWNSHIP, BRIDGE REPLACEMENT 569,000 30 (BASE CONSTRUCTION ALLOCATION - 19910H1959B3288 - 114 -
1 $517,000) 2 (DESIGN AND CONTINGENCIES - $52,000) 3 (8) S.R.2032 OVER SPRING CREEK, UPPER 4 SAUCON TOWNSHIP, BRIDGE REPLACEMENT 140,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $100,000) 7 (LAND ALLOCATION - $20,000) 8 (DESIGN AND CONTINGENCIES - $20,000) 9 (9) S.R.0145 OVER JORDAN CREEK, CITY OF 10 ALLENTOWN, BRIDGE REPLACEMENT 2,660,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $2,000,000) 13 (LAND ALLOCATION - $460,000) 14 (DESIGN AND CONTINGENCIES - $200,000) 15 (10) S.R.2055 ALBURTIS MEYERS BRIDGE OVER 16 HARRISON ST., LAWRENCE ST., LITTLE 17 LEHIGH CREEK AND RAILROAD, CITY OF 18 ALLENTOWN, BRIDGE REPLACEMENT 2,200,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $2,000,000) 21 (DESIGN AND CONTINGENCIES - $200,000) 22 (11) S.R.2030, CENTENNIAL BRIDGE OVER 23 SAUCON CREEK, UPPER SAUCON 24 TOWNSHIP, BRIDGE REPLACEMENT 386,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $337,000) 27 (LAND ALLOCATION - $16,000) 28 (DESIGN AND CONTINGENCIES - $33,000) 29 (12) TILGHMAN STREET BRIDGE OVER LEHIGH 30 RIVER, CITY OF ALLENTOWN, BRIDGE 19910H1959B3288 - 115 -
1 REHABILITATION 4,100,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $3,550,000) 4 (LAND ALLOCATION - $100,000) 5 (DESIGN AND CONTINGENCIES - $450,000) 6 SECTION 44. LUZERNE COUNTY. 7 (A) LOCAL BRIDGES 8 (1) NESCOPECK TOWNSHIP, T-376 BRIDGE OVER 9 NESCOPECK CREEK, BRIDGE REPLACEMENT 418,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $324,000) 12 (LAND ALLOCATION - $10,000) 13 (DESIGN AND CONTINGENCIES - $84,000) 14 (2) LEHMAN TOWNSHIP, T-581 BRIDGE OVER 15 INLET PIKES CREEK RESERVOIR, BRIDGE 16 REPLACEMENT 260,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $194,000) 19 (LAND ALLOCATION - $15,000) 20 (DESIGN AND CONTINGENCIES - $51,000) 21 (3) ROSS TOWNSHIP, COUNTY ROAD BRIDGE NO.1 22 OVER HUNLOCK CREEK, BRIDGE REPLACEMENT 269,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $194,000) 25 (LAND ALLOCATION - $15,000 26 (DESIGN AND CONTINGENCIES - $60,000 27 (4) KINGSTON TOWNSHIP, COUNTY ROAD BRIDGE 28 NO.16 OVER TOBY'S CREEK, BRIDGE 29 REPLACEMENT 379,000 30 (BASE CONSTRUCTION ALLOCATION - 19910H1959B3288 - 116 -
1 $301,000) 2 (DESIGN AND CONTINGENCIES - $78,000) 3 (5) BLACK CREEK TOWNSHIP, T-309 BRIDGE 4 OVER FALLS RUN, BRIDGE REPLACEMENT 280,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $210,000) 7 (LAND ALLOCATION - $ 15,000 8 (DESIGN AND CONTINGENCIES - $55,000) 9 (6) JACKSON TOWNSHIP, T-704 BRIDGE OVER 10 BRANCH OF HARVEYS CREEK, BRIDGE 11 REPLACEMENT 260,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $194,000) 14 (LAND ALLOCATION - $15,000 15 (DESIGN AND CONTINGENCIES - $51,000) 16 (7) UNION TOWNSHIP, T-451 BRIDGE OVER 17 SHICKSHINNY CREEK, BRIDGE REPLACEMENT 269,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $194,000) 20 (LAND ALLOCATION - $15,000 21 (DESIGN AND CONTINGENCIES - $ 60,000) 22 (8) SUGARLOAF TOWNSHIP, COUNTY ROAD BRIDGE 23 NO.37 OVER LITTLE NESCOPECK CREEK, 24 BRIDGE REPLACEMENT 368,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $292,000) 27 (DESIGN AND CONTINGENCIES - $76,000) 28 (9) SUGARLOAF TOWNSHIP, T-332 BRIDGE OVER 29 NESCOPECK CREEK, BRIDGE REPLACEMENT 422,000 30 (BASE CONSTRUCTION ALLOCATION - 19910H1959B3288 - 117 -
1 $335,000) 2 (DESIGN AND CONTINGENCIES - $87,000) 3 (10) HANOVER TOWNSHIP, OXFORD STREET OVER 4 SOLOMON'S CREEK, BRIDGE REPLACEMENT 368,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $292,000) 7 (DESIGN AND CONTINGENCIES - $76,000) 8 (11) FAIRMOUNT TOWNSHIP, T-620 BRIDGE OVER 9 PHILLIPS CREEK, BRIDGE REPLACEMENT 277,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $212,000) 12 (DESIGN AND CONTINGENCIES - $65,000) 13 (12) HANOVER TOWNSHIP, EAST DIVISION 14 STREET OVER SOLOMON'S CREEK, BRIDGE 15 REPLACEMENT 251,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $199,000) 18 (DESIGN AND CONTINGENCIES - $52,000) 19 (13) DORRANCE TOWNSHIP, T-404 BRIDGE OVER 20 LITTLE WAPWALLOPEN CREEK, BRIDGE 21 REPLACEMENT 260,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $194,000) 24 (LAND ALLOCATION - $ 15,000) 25 (DESIGN AND CONTINGENCIES - $51,000) 26 (14) BUTLER TOWNSHIP, COUNTY ROAD BRIDGE 27 NO.41 OVER NESCOPECK CREEK, BRIDGE 28 REPLACEMENT 260,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $194,000) 19910H1959B3288 - 118 -
1 (LAND ALLOCATION - $15,000) 2 (DESIGN AND CONTINGENCIES - $51,000) 3 (15) DORRANCE TOWNSHIP, T-387 BRIDGE OVER 4 WAPWALLOPEN CREEK, BRIDGE REPLACEMENT 341,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $259,000) 7 (LAND ALLOCATION - $15,000) 8 (DESIGN AND CONTINGENCIES - $67,000) 9 (16) DORRANCE TOWNSHIP, COUNTY ROAD BRIDGE 10 NO.29 OVER WAPWALLOPEN CREEK, BRIDGE 11 REPLACEMENT 225,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $160,000) 14 (DESIGN AND CONTINGENCIES - $65,000) 15 (17) LEHMAN TOWNSHIP, T-322 BRIDGE NO.14 16 MASKENOZHA BRIDGE OVER LAKE MASKENOZHA 17 OUTLET, BRIDGE REPLACEMENT 210,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $165,000) 20 (LAND ALLOCATION - $20,000) 21 (DESIGN AND CONTINGENCIES - $25,000) 22 (18) NESCOPECK TOWNSHIP, T-453 OVER 23 TRIBUTARY TO NESCOPECK CREEK 24 NO.044090201, BRIDGE REPLACEMENT 350,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $300,000) 27 (LAND ALLOCATION - $10,000) 28 (DESIGN AND CONTINGENCIES - $40,000) 29 (19) DURYEA BOROUGH, STEPHENSON STREET 30 OVER LACKAWANNA RIVER, BRIDGE 19910H1959B3288 - 119 -
1 REPLACEMENT 330,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $300,000) 4 (DESIGN AND CONTINGENCIES - $30,000) 5 (20) DUPONT BOROUGH, BRIDGE ON ELM STREET 6 OVER MILL CREEK, BRIDGE REPLACEMENT 240,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $220,000) 9 (DESIGN AND CONTINGENCIES - $20,000) 10 (21) CITY OF WILKES-BARRE, GOVIER STREET 11 OVER LAUREL RUN CREEK, BRIDGE 12 REPLACEMENT 31,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $25,000) 15 (DESIGN AND CONTINGENCIES - $6,000) 16 (22) CITY OF WILKES-BARRE, SIDNEY STREET 17 OVER MILL CREEK, BRIDGE REPLACEMENT 59,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $50,000) 20 (DESIGN AND CONTINGENCIES - $9,000) 21 (23) CITY OF WILKES-BARRE, REGENT STREET 22 OVER SOLOMON'S CREEK, BRIDGE 23 REPLACEMENT 26,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $20,000) 26 (DESIGN AND CONTINGENCIES - $6,000) 27 (24) CITY OF WILKES-BARRE, STRAUSS STREET 28 OVER SOLOMON'S CREEK, BRIDGE 29 REPLACEMENT 16,000 30 (BASE CONSTRUCTION ALLOCATION - 19910H1959B3288 - 120 -
1 $12,000) 2 (DESIGN AND CONTINGENCIES - $4,000) 3 (25) CITY OF WILKES-BARRE, BARNEY STREET 4 OVER SOLOMON'S CREEK, BRIDGE 5 REPLACEMENT 15,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $11,000) 8 (DESIGN AND CONTINGENCIES - $4,000) 9 (26) CITY OF WILKES-BARRE, FRANKLIN STREET 10 OVER SOLOMON'S CREEK, BRIDGE 11 REPLACEMENT 59,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $50,000) 14 (DESIGN AND CONTINGENCIES - $9,000) 15 (27) CITY OF WILKES-BARRE, WALKER STREET 16 OVER SOLOMON'S CREEK, BRIDGE 17 REPLACEMENT 175,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $150,000) 20 (DESIGN AND CONTINGENCIES - $25,000) 21 (28) CITY OF WILKES-BARRE, MILL STREET 22 OVER LAUREL RUN CREEK, BRIDGE 23 REPLACEMENT 175,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $150,000) 26 (DESIGN AND CONTINGENCIES - $25,000) 27 (29) CITY OF WILKES-BARRE, SCOTT STREET 28 OVER COAL BROOK, BRIDGE REPLACEMENT 120,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $100,000) 19910H1959B3288 - 121 -
1 (DESIGN AND CONTINGENCIES - $20,000) 2 (30) CITY OF WILKES-BARRE, WALLER STREET 3 OVER SOLOMON'S CREEK NO.044091245, 4 BRIDGE REPLACEMENT 175,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $150,000) 7 (DESIGN AND CONTINGENCIES - $25,000) 8 (31) BUTLER TOWNSHIP, COUNTY ROAD BRIDGE 9 NO.1 OVER NESCOPECK CREEK, BRIDGE 10 REPLACEMENT 280,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $210,000) 13 (LAND ALLOCATION - $15,000) 14 (DESIGN AND CONTINGENCIES - $55,000) 15 (B) STATE BRIDGES 16 (1) S.R.2035 BRIDGE OVER LITTLE MILL 17 CREEK, PITTSTON TOWNSHIP, BRIDGE 18 REPLACEMENT 648,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $570,000) 21 (LAND ALLOCATION - $10,000) 22 (DESIGN AND CONTINGENCIES - $68,000) 23 (2) S.R.2035 BRIDGE OVER MEADOW RUN, BEAR 24 CREEK TOWNSHIP, BRIDGE REPLACEMENT 480,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $420,000) 27 (LAND ALLOCATION - $10,000) 28 (DESIGN AND CONTINGENCIES - $50,000) 29 (3) S.R.2020 BRIDGE OVER BRANCH OF MILL 30 CREEK, PLAINS TOWNSHIP, BRIDGE 19910H1959B3288 - 122 -
1 REPLACEMENT 382,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $332,000) 4 (LAND ALLOCATION - $10,000) 5 (DESIGN AND CONTINGENCIES - $40,000) 6 (4) S.R.2004 BRIDGE OVER RAILROAD, PLAINS 7 TOWNSHIP, BRIDGE REPLACEMENT 1,350,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $1,197,000) 10 (LAND ALLOCATION - $10,000) 11 (DESIGN AND CONTINGENCIES - $143,000) 12 (5) S.R.4016 BRIDGE OVER HUNLOCK CREEK 13 NO.044091233, HUNLOCK TOWNSHIP, BRIDGE 14 REPLACEMENT 1,130,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $1,000,000) 17 (LAND ALLOCATION - $10,000) 18 (DESIGN AND CONTINGENCIES - $120,000) 19 (6) S.R.1021 BRIDGE OVER ABRAHAM'S CREEK 20 NO.044091234, KINGSTON TOWNSHIP, BRIDGE 21 REPLACEMENT 540,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $472,000) 24 (LAND ALLOCATION - $10,000) 25 (DESIGN AND CONTINGENCIES - $58,000) 26 (7) S.R.4008 BRIDGE OVER BRANCH OF 27 HUNTINGTON CREEK NO.044091232, 28 HUNTINGTON TOWNSHIP, BRIDGE 29 REPLACEMENT 346,000 30 (BASE CONSTRUCTION ALLOCATION - 19910H1959B3288 - 123 -
1 $300,000) 2 (LAND ALLOCATION - $10,000) 3 (DESIGN AND CONTINGENCIES - $36,000) 4 (8) S.R.4007 BRIDGE OVER SHICKSHINNY CREEK 5 NO.044091231, UNION TOWNSHIP, BRIDGE 6 REPLACEMENT 752,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $662,000) 9 (LAND ALLOCATION - $10,000) 10 (DESIGN AND CONTINGENCIES - $80,000) 11 (9) S.R.1032 BRIDGE OVER PIKES CREEK 12 NO.0044091225, LAKE TOWNSHIP, BRIDGE 13 REPLACEMENT 486,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $425,000) 16 (LAND ALLOCATION - $10,000) 17 (DESIGN AND CONTINGENCIES - $51,000) 18 (10) S.R.0029 BRIDGE OVER ABANDONED 19 RAILROAD, SUGAR NOTCH BOROUGH, BRIDGE 20 REPLACEMENT 1,920,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $1,710,000) 23 (LAND ALLOCATION - $10,000) 24 (DESIGN AND CONTINGENCIES - $200,000) 25 (11) S.R.0309 BRIDGE OVER RAILROAD AND 26 NANTICOKE CREEK, HANOVER TOWNSHIP, 27 BRIDGE REPLACEMENT 2,760,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $2,500,000) 30 (LAND ALLOCATION - $10,000) 19910H1959B3288 - 124 -
1 (DESIGN AND CONTINGENCIES - $250,000) 2 (12) S.R.0081 BRIDGE OVER CONRAIL 3 RAILROAD, HAZLE TOWNSHIP, BRIDGE 4 REPLACEMENT 1,540,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $1,370,000) 7 (LAND ALLOCATION - $10,000) 8 (DESIGN AND CONTINGENCIES - $160,000) 9 (13) S.R.0081 BRIDGE OVER CONRAIL 10 RAILROAD, HAZLE TOWNSHIP, BRIDGE 11 REPLACEMENT 1,540,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $1,370,000) 14 (LAND ALLOCATION - $10,000) 15 (DESIGN AND CONTINGENCIES - $160,000) 16 (14) S.R.1026 BRIDGE OVER LEONARDS CREEK, 17 DALLAS TOWNSHIP, BRIDGE REPLACEMENT 570,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $500,000) 20 (LAND ALLOCATION - $10,000) 21 (DESIGN AND CONTINGENCIES - $60,000) 22 (15) S.R.0029 BRIDGE OVER HAUL ROAD, 23 HANOVER TOWNSHIP, BRIDGE REPLACEMENT 2,925,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $2,615,000) 26 (LAND ALLOCATION - $10,000) 27 (DESIGN AND CONTINGENCIES - $300,000) 28 (16) S.R.1035 BRIDGE OVER CIDER RUN CREEK, 29 FRANKLIN TOWNSHIP, BRIDGE REPLACEMENT 458,000 30 (BASE CONSTRUCTION ALLOCATION - 19910H1959B3288 - 125 -
1 $400,000) 2 (LAND ALLOCATION - $10,000) 3 (DESIGN AND CONTINGENCIES - $48,000) 4 (17) S.R.3005 BRIDGE OVER BLACK BROOK, 5 SLOCUM TOWNSHIP, BRIDGE REPLACEMENT 587,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $515,000) 8 (LAND ALLOCATION - $10,000) 9 (DESIGN AND CONTINGENCIES - $62,000) 10 (18) S.R.2045 BRIDGE OVER BRANCH OF 11 WAPWALLOPEN CREEK, BRIDGE REPLACEMENT 738,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $650,000) 14 (LAND ALLOCATION - $10,000) 15 (DESIGN AND CONTINGENCIES - $78,000) 16 (19) S.R.3005 BRIDGE OVER BLACK BROOK, 17 SLOCUM TOWNSHIP, BRIDGE REPLACEMENT 620,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $545,000) 20 (LAND ALLOCATION - $10,000) 21 (DESIGN AND CONTINGENCIES - $65,000) 22 (20) S.R.3011 BRIDGE OVER WAPWALLOPEN 23 CREEK, HOLLENBACK TOWNSHIP, BRIDGE 24 REPLACEMENT 738,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $650,000) 27 (LAND ALLOCATION - $10,000) 28 (DESIGN AND CONTINGENCIES - $78,000) 29 (21) S.R.0029 BRIDGE OVER T.R.11, PLYMOUTH 30 TOWNSHIP, BRIDGE REPLACEMENT 470,000 19910H1959B3288 - 126 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $410,000) 3 (LAND ALLOCATION - $10,000) 4 (DESIGN AND CONTINGENCIES - $50,000) 5 (22) S.R.3020 BRIDGE OVER BRANCH OF BLACK 6 CREEK, BLACK CREEK TOWNSHIP, BRIDGE 7 REPLACEMENT 540,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $472,000) 10 (LAND ALLOCATION - $10,000) 11 (DESIGN AND CONTINGENCIES - $58,000) 12 (23) S.R.2035 BRIDGE OVER LITTLE MILLE 13 CREEK, PITTSTON TOWNSHIP, BRIDGE 14 REPLACEMENT 648,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $570,000) 17 (LAND ALLOCATION - $10,000) 18 (DESIGN AND CONTINGENCIES - $68,000) 19 (24) S.R.0239 BRIDGE OVER SHICKSHINNY 20 CREEK, UNION TOWNSHIP, BRIDGE 21 REPLACEMENT 850,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $750,000) 24 (LAND ALLOCATION - $10,000) 25 (DESIGN AND CONTINGENCIES - $90,000) 26 (25) S.R.1036 BRIDGE OVER LEONARDS CREEK, 27 KINGSTON TOWNSHIP, BRIDGE REPLACEMENT 775,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $684,000) 30 (LAND ALLOCATION - $10,000) 19910H1959B3288 - 127 -
1 (DESIGN AND CONTINGENCIES - $81,000) 2 (26) S.R.0404 BRIDGE OVER LITTLE 3 SHICKSHINNY CREEK, SALEM TOWNSHIP, 4 BRIDGE REPLACEMENT 822,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $725,000) 7 (LAND ALLOCATION - $10,000) 8 (DESIGN AND CONTINGENCIES - $87,000) 9 (27) S.R.1036 BRIDGE OVER TOBY CREEK, 10 KINGSTON TOWNSHIP, BRIDGE REPLACEMENT 640,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $563,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $67,000) 15 (28) S.R.1013 BRIDGE OVER TOBY CREEK, 16 LUZERNE BOROUGH, BRIDGE REPLACEMENT 1,218,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $1,078,000) 19 (LAND ALLOCATION - $10,000) 20 (DESIGN AND CONTINGENCIES - $130,000) 21 (29) S.R.1032 BRIDGE OVER BRANCH OF BEAR 22 HOLLOW CREEK, LAKE TOWNSHIP, BRIDGE 23 REPLACEMENT 503,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $440,000) 26 (LAND ALLOCATION - $10,000) 27 (DESIGN AND CONTINGENCIES - $53,000) 28 (30) S.R.2008 BRIDGE OVER NANTICOKE CREEK, 29 HANOVER TOWNSHIP, BRIDGE REPLACEMENT 628,000 30 (BASE CONSTRUCTION ALLOCATION - 19910H1959B3288 - 128 -
1 $552,000) 2 (LAND ALLOCATION - $10,000) 3 (DESIGN AND CONTINGENCIES - $66,000) 4 (31) S.R.2005 BRIDGE OVER BOWMAN SPRING 5 RUN, CITY OF WILKES-BARRE, BRIDGE 6 REPLACEMENT 510,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $447,000) 9 (LAND ALLOCATION - $10,000) 10 (DESIGN AND CONTINGENCIES - $53,000) 11 (32) S.R.2015 BRIDGE OVER GARDNER CREEK, 12 LAFLIN BOROUGH, BRIDGE REPLACEMENT 592,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $520,000) 15 (LAND ALLOCATION - $10,000) 16 (DESIGN AND CONTINGENCIES - $62,000) 17 (33) S.R.2017 BRIDGE OVER S.R.3031, 18 JENKINS TOWNSHIP, BRIDGE REPLACEMENT 1,156,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $1,034,000) 21 (LAND ALLOCATION - $10,000) 22 (DESIGN AND CONTINGENCIES - $112,000) 23 (34) S.R.2020 BRIDGE OVER BRANCH OF MILL 24 CREEK, PLAINS TOWNSHIP, BRIDGE 25 REPLACEMENT 382,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $332,000) 28 (LAND ALLOCATION - $10,000) 29 (DESIGN AND CONTINGENCIES - $40,000) 30 (35) S.R.2020 BRIDGE OVER MILL CREEK, 19910H1959B3288 - 129 -
1 PLAINS TOWNSHIP, BRIDGE REPLACEMENT 727,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $640,000) 4 (LAND ALLOCATION - $10,000) 5 (DESIGN AND CONTINGENCIES - $77,000) 6 (36) S.R.2026 BRIDGE OVER GARDNERS CREEK, 7 LAFLIN BOROUGH, BRIDGE REPLACEMENT 772,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $680,000) 10 (LAND ALLOCATION - $10,000) 11 (DESIGN AND CONTINGENCIES - $82,000) 12 (37) S.R.0118 BRIDGE OVER BRANCH OF 13 HARVEYS CREEK, LEHMAN TOWNSHIP, BRIDGE 14 REPLACEMENT 604,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $530,000) 17 (LAND ALLOCATION - $10,000) 18 (DESIGN AND CONTINGENCIES - $64,000) 19 (38) S.R.1010 BRIDGE OVER ABRAHAMS CREEK, 20 WEST WYOMING BOROUGH, BRIDGE 21 REPLACEMENT 1,230,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $1,087,000) 24 (LAND ALLOCATION - $10,000) 25 (DESIGN AND CONTINGENCIES - $133,000) 26 (39) S.R.2002 BRIDGE OVER SOLOMON'S CREEK, 27 HANOVER TOWNSHIP, BRIDGE REPLACEMENT 1,475,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $1,308,000) 30 (LAND ALLOCATION - $10,000) 19910H1959B3288 - 130 -
1 (DESIGN AND CONTINGENCIES - $157,000) 2 (40) S.R.2029 BRIDGE OVER MILL CREEK, 3 AVOCA BOROUGH, BRIDGE REPLACEMENT 984,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $870,000) 6 (LAND ALLOCATION - $10,000) 7 (DESIGN AND CONTINGENCIES - $104,000) 8 (41) S.R.2035 BRIDGE OVER BRANCH OF MEADOW 9 RUN, BEAR CREEK TOWNSHIP, BRIDGE 10 REPLACEMENT 525,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $460,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $55,000) 15 (42) S.R.2035 BRIDGE OVER BEAR CREEK, BEAR 16 CREEK TOWNSHIP, BRIDGE REPLACEMENT 452,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $395,000) 19 (LAND ALLOCATION - $10,000) 20 (DESIGN AND CONTINGENCIES - $37,000) 21 (43) S.R. 2020 BRIDGE OVER MILL CREEK, 22 PLAINS TOWNSHIP, BRIDGE REPLACEMENT 727,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $640,000) 25 (LAND ALLOCATION - $10,000) 26 (DESIGN AND CONTINGENCIES - $77,000) 27 (44) S.R.2017 BRIDGE OVER S.R.2021, 28 JENKINS TOWNSHIP, BRIDGE REPLACEMENT 1,156,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $1,034,000) 19910H1959B3288 - 131 -
1 (LAND ALLOCATION - $10,000) 2 (DESIGN AND CONTINGENCIES - $112,000) 3 (45) S.R.2021 CULVERT SEGMENT 0020, OFFSET 4 2190, PITTSTON TOWNSHIP, BRIDGE 5 REPLACEMENT 300,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $260,000) 8 (LAND ALLOCATION - $10,000) 9 (DESIGN AND CONTINGENCIES - $30,000) 10 (46) S.R.2024 CULVERT SEGMENT 0110, OFFSET 11 0000 PI NO.044092201, JENKINS TOWNSHIP, 12 BRIDGE REPLACEMENT 200,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $170,000) 15 (LAND ALLOCATION - $10,000) 16 (DESIGN AND CONTINGENCIES - $20,000) 17 SECTION 45. LYCOMING COUNTY. 18 (A) LOCAL BRIDGES 19 (1) ARMSTRONG TOWNSHIP, T-329 OVER 20 MOSQUITO CREEK, BRIDGE REPLACEMENT 427,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $342,000) 23 (LAND ALLOCATION - $21,000) 24 (DESIGN AND CONTINGENCIES - $64,000) 25 (2) ARMSTRONG TOWNSHIP, T-434 OVER 26 MOSQUITO CREEK, BRIDGE REPLACEMENT 541,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $433,000) 29 (LAND ALLOCATION - $27,000) 30 (DESIGN AND CONTINGENCIES - $81,000) 19910H1959B3288 - 132 -
1 (3) BROWN TOWNSHIP, T-762 OVER JACOBS RUN, 2 BRIDGE REPLACEMENT 411,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $329,000) 5 (LAND ALLOCATION - $21,000) 6 (DESIGN AND CONTINGENCIES - $61,000) 7 (4) CASCADE TOWNSHIP, T-665 OVER POTASH 8 HOLLOW CREEK, BRIDGE REPLACEMENT 214,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $171,000) 11 (LAND ALLOCATION - $11,000) 12 (DESIGN AND CONTINGENCIES - $32,000) 13 (5) FRANKLIN TOWNSHIP, T-710 OVER BEAVER 14 RUN, BRIDGE REPLACEMENT 265,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $212,000) 17 (LAND ALLOCATION - $13,000) 18 (DESIGN AND CONTINGENCIES - $40,000) 19 (6) HEPBURN TOWNSHIP, T-510 OVER MILL 20 CREEK, BRIDGE REPLACEMENT 303,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $257,000) 23 (DESIGN AND CONTINGENCIES - $46,000) 24 (7) JORDAN TOWNSHIP, T-740 OVER MUNCY 25 CREEK, NORTHEAST OF LAIRDSVILLE, BRIDGE 26 REPLACEMENT 321,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $269,000) 29 (LAND ALLOCATION - $29,000) 30 (DESIGN AND CONTINGENCIES - $23,000) 19910H1959B3288 - 133 -
1 (8) LEWIS TOWNSHIP, T-856 OVER PLEASANT 2 STREAM, BRIDGE REPLACEMENT 424,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $302,000) 5 (LAND ALLOCATION - $19,000) 6 (DESIGN AND CONTINGENCIES - $103,000) 7 (9) LEWIS TOWNSHIP, T-629 OVER SLACKS RUN, 8 BRIDGE REPLACEMENT 356,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $285,000) 11 (LAND ALLOCATION - $18,000) 12 (DESIGN AND CONTINGENCIES - $53,000) 13 (10) LEWIS TOWNSHIP, T-836 OVER TROUT RUN, 14 BRIDGE REPLACEMENT 321,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $257,000) 17 (LAND ALLOCATION - $16,000) 18 (DESIGN AND CONTINGENCIES - $48,000) 19 (11) MORELAND TOWNSHIP, T-664 OVER GERMAN 20 RUN, BRIDGE REPLACEMENT 300,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $240,000) 23 (LAND ALLOCATION - $15,000) 24 (DESIGN AND CONTINGENCIES - $45,000) 25 (12) MORELAND TOWNSHIP, T-668, KRAMER HILL 26 ROAD OVER SUGAR RUN, BRIDGE 27 REPLACEMENT 245,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $196,000) 30 (LAND ALLOCATION - $12,000) 19910H1959B3288 - 134 -
1 (DESIGN AND CONTINGENCIES - $37,000) 2 (13) MORELAND TOWNSHIP, T-447 OVER LAUREL 3 RUN NO.1, BRIDGE REPLACEMENT 311,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $264,000) 6 (LAND ALLOCATION - $15,000) 7 (DESIGN AND CONTINGENCIES - $32,000) 8 (14) MORELAND TOWNSHIP, T-638 OVER LAUREL 9 RUN, BRIDGE REPLACEMENT 285,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $228,000) 12 (LAND ALLOCATION - $14,000) 13 (DESIGN AND CONTINGENCIES - $43,000) 14 (15) PENN TOWNSHIP, T-654 OVER GREGGS RUN, 15 BRIDGE REPLACEMENT 225,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $180,000) 18 (LAND ALLOCATION - $11,000) 19 (DESIGN AND CONTINGENCIES - $34,000) 20 (16) PENN/FRANKLIN TOWNSHIP, T-706 OVER 21 BEAVER RUN, BRIDGE REPLACEMENT 272,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $217,000) 24 (LAND ALLOCATION - $14,000) 25 (DESIGN AND CONTINGENCIES - $41,000) 26 (17) PINE TOWNSHIP, T-776 OVER ENGLISH RUN 27 NO.2, BRIDGE REPLACEMENT 325,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $260,000) 30 (LAND ALLOCATION - $16,000) 19910H1959B3288 - 135 -
1 (DESIGN AND CONTINGENCIES - $49,000) 2 (18) PINE TOWNSHIP, T-782 OVER ROCK RUN, 3 BRIDGE REPLACEMENT 225,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $180,000) 6 (LAND ALLOCATION - $11,000) 7 (DESIGN AND CONTINGENCIES - $34,000) 8 (19) PINE TOWNSHIP, T-782 OVER TEXAS CREEK 9 NO.1, BRIDGE REPLACEMENT 484,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $387,000) 12 (LAND ALLOCATION - $24,000) 13 (DESIGN AND CONTINGENCIES - $73,000) 14 (20) SHREWSBURY TOWNSHIP, T-658 OVER BIG 15 RUN, BRIDGE REPLACEMENT 250,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $210,000) 18 (LAND ALLOCATION - $10,000) 19 (DESIGN AND CONTINGENCIES - $30,000) 20 (21) SHREWSBURY TOWNSHIP, T-686 OVER ROCK 21 RUN NO.1, BRIDGE REPLACEMENT 305,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $244,000) 24 (LAND ALLOCATION - $15,000) 25 (DESIGN AND CONTINGENCIES - $46,000) 26 (22) SHREWSBURY TOWNSHIP, T-686 OVER ROCK 27 RUN NO.2, BRIDGE REPLACEMENT 262,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $202,000) 30 (LAND ALLOCATION - $13,000) 19910H1959B3288 - 136 -
1 (DESIGN AND CONTINGENCIES - $47,000) 2 (23) WASHINGTON TOWNSHIP, T-397 OVER WHITE 3 DEER HOLE CREEK, BRIDGE REPLACEMENT 204,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $170,000) 6 (LAND ALLOCATION - $19,000) 7 (DESIGN AND CONTINGENCIES - $15,000) 8 (24) WOLF TOWNSHIP, T-250 OVER GREGGS RUN, 9 BRIDGE REPLACEMENT 290,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $245,000) 12 (LAND ALLOCATION - $10,000) 13 (DESIGN AND CONTINGENCIES - $35,000) 14 (25) LOYALSOCK TOWNSHIP, MILLER STREET 15 BETWEEN WILLIAMSPORT CITY LINE AND 16 WARREN AVENUE, BRIDGE REPLACEMENT 250,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $200,000) 19 (LAND ALLOCATION - $20,000) 20 (DESIGN AND CONTINGENCIES - $30,000) 21 (B) STATE BRIDGES 22 (1) S.R.3018, T-842, FIRST FORKS ROAD 23 BRIDGE OVER FIRST FORK LARRYS CREEK, 24 MIFFLIN TOWNSHIP, BRIDGE REPLACEMENT 425,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $340,000) 27 (LAND ALLOCATION - $64,000) 28 (DESIGN AND CONTINGENCIES - $21,000) 29 SECTION 46. MCKEAN COUNTY. 30 (A) LOCAL BRIDGES (RESERVED) 19910H1959B3288 - 137 -
1 (B) STATE BRIDGES 2 (1) S.R.0046, HAVEN BROOK BRIDGE OVER 3 HAVENS BROOK, NORWICH TOWNSHIP, BRIDGE 4 REPLACEMENT 700,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $500,000) 7 (LAND ALLOCATION - $100,000) 8 (DESIGN AND CONTINGENCIES - $100,000) 9 (2) S.R.0770, SHEPPARD RUN BRIDGE OVER 10 SHEPPARD RUN, BRADFORD TOWNSHIP, BRIDGE 11 REPLACEMENT 725,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $525,000) 14 (LAND ALLOCATION - $100,000) 15 (DESIGN AND CONTINGENCIES - $100,000) 16 (3) S.R.0046 BRIDGE OVER HAVENS BROOK, 17 NORWICH TOWNSHIP, BRIDGE REPLACEMENT 700,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $500,000) 20 (LAND ALLOCATION - $100,000) 21 (DESIGN AND CONTINGENCIES - $100,000) 22 (4) S.R.0770 BRIDGE OVER SHEPPARD RUN, 23 BRADFORD TOWNSHIP, BRIDGE REPLACEMENT 725,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $525,000) 26 (LAND ALLOCATION - $100,000) 27 (DESIGN AND CONTINGENCIES - $100,000) 28 (5) S.R.0006 BRIDGE OVER ALLEGHENY RIVER, 29 PORT ALLEGHENY BOROUGH, BRIDGE 30 REPLACEMENT 4,050,000 19910H1959B3288 - 138 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $3,600,000) 3 (LAND ALLOCATION - $150,000) 4 (DESIGN AND CONTINGENCIES - $300,000) 5 (6) S.R.0006 BRIDGE OVER CONRAIL, PORT 6 ALLEGHENY BOROUGH, BRIDGE REPLACEMENT 1,850,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $1,500,000) 9 (LAND ALLOCATION - $150,000) 10 (DESIGN AND CONTINGENCIES - $200,000) 11 (7) S.R.0155 BRIDGE OVER ALLEGHENY RIVER, 12 PORT ALLEGHENY BOROUGH, BRIDGE 13 REPLACEMENT 2,550,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $2,150,000) 16 (LAND ALLOCATION - $150,000) 17 (DESIGN AND CONTINGENCIES - $250,000) 18 (8) S.R.0155 BRIDGE OVER ROCK RUN, ANNIN 19 TOWNSHIP, BRIDGE REPLACEMENT 650,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $450,000) 22 (LAND ALLOCATION - $100,000) 23 (DESIGN AND CONTINGENCIES - $100,000) 24 (9) S.R.0219, BRADFORD BYPASS BRIDGE OVER 25 S.R.0346 AND S.R.4013, FOSTER TOWNSHIP, 26 BRIDGE REPLACEMENT 250,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $200,000) 29 (DESIGN AND CONTINGENCIES - $50,000) 30 (10) S.R.3006 BRIDGE OVER KINZUA CREEK, 19910H1959B3288 - 139 -
1 LAFAYETTE TOWNSHIP, BRIDGE REPLACEMENT 1,250,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $950,000) 4 (LAND ALLOCATION - $150,000) 5 (DESIGN AND CONTINGENCIES - $150,000) 6 (11) S.R.4004, TUNUNGAWANT CREEK BRIDGE 7 NO.1 OVER WEST BRANCH OF TUNUNGAWANT 8 CREEK, BRADFORD TOWNSHIP, BRIDGE 9 REPLACEMENT 1,250,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $1,000,000) 12 (LAND ALLOCATION - $100,000) 13 (DESIGN AND CONTINGENCIES - $150,000) 14 SECTION 47. MERCER COUNTY. 15 (A) LOCAL BRIDGES 16 (1) BRIDGE NO.43710104232323, BRIDGE 17 REPLACEMENT 315,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $280,000) 20 (LAND ALLOCATION - $5,000) 21 (DESIGN AND CONTINGENCIES - $30,000) 22 (2) FAIRVIEW TOWNSHIP, MCCARTNEY ROAD, 23 BRIDGE REPLACEMENT 208,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $180,000) 26 (LAND ALLOCATION - $5,000) 27 (DESIGN AND CONTINGENCIES - $23,000) 28 (3) FINDLEY TOWNSHIP, CRIBBS ROAD, BRIDGE 29 REPLACEMENT 230,000 30 (BASE CONSTRUCTION ALLOCATION - 19910H1959B3288 - 140 -
1 $200,000) 2 (LAND ALLOCATION - $5,000) 3 (DESIGN AND CONTINGENCIES - $25,000) 4 (4) COALSPRING TOWNSHIP, MCEWEN ROAD, 5 BRIDGE REPLACEMENT 208,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $180,000) 8 (LAND ALLOCATION - $5,000) 9 (DESIGN AND CONTINGENCIES - $23,000) 10 (5) HERMITAGE BOROUGH, KELLY ROAD, BRIDGE 11 REPLACEMENT 851,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $784,000) 14 (LAND ALLOCATION - $7,000) 15 (DESIGN AND CONTINGENCIES - $60,000) 16 (6) HEMPFIELD TOWNSHIP, BLAHERT ROAD, 17 BRIDGE REPLACEMENT 220,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $190,000) 20 (LAND ALLOCATION - $5,000) 21 (DESIGN AND CONTINGENCIES - $25,000) 22 (7) PERRY TOWNSHIP, PIERSON ROAD, BRIDGE 23 REPLACEMENT 647,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $558,000) 26 (LAND ALLOCATION - $5,000) 27 (DESIGN AND CONTINGENCIES - $84,000) 28 (8) JEFFERSON TOWNSHIP, FULLINGMILL ROAD, 29 BRIDGE REPLACEMENT 230,000 30 (BASE CONSTRUCTION ALLOCATION - 19910H1959B3288 - 141 -
1 $200,000) 2 (LAND ALLOCATION - $5,000) 3 (DESIGN AND CONTINGENCIES - $25,000) 4 (9) HERMITAGE BOROUGH, KELLEY ROAD, BRIDGE 5 REPLACEMENT 1,020,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $941,000) 8 (LAND ALLOCATION - $7,000) 9 (DESIGN AND CONTINGENCIES - $72,000) 10 (10) LAKE TOWNSHIP, CANNON ROAD, BRIDGE 11 REPLACEMENT 414,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $335,000) 14 (LAND ALLOCATION - $5,000) 15 (DESIGN AND CONTINGENCIES - $74,000) 16 (11) GROVE CITY, EAST PINE STREET, BRIDGE 17 REPLACEMENT 867,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $794,000) 20 (LAND ALLOCATION - $5,000) 21 (DESIGN AND CONTINGENCIES - $68,000) 22 (12) CITY OF SHARON, OAKLAND AVENUE, 23 BRIDGE REPLACEMENT 3,757,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $3,180,000) 26 (LAND ALLOCATION - $100,000) 27 (DESIGN AND CONTINGENCIES - $477,000) 28 (13) FRENCH CREEK TOWNSHIP, LOWER ROAD, 29 BRIDGE REPLACEMENT 398,000 30 (BASE CONSTRUCTION ALLOCATION - 19910H1959B3288 - 142 -
1 $320,000) 2 (LAND ALLOCATION - $5,000) 3 (DESIGN AND CONTINGENCIES - $73,000) 4 (14) WOLF CREEK TOWNSHIP, JACK ROAD, 5 BRIDGE REPLACEMENT 320,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $274,000) 8 (LAND ALLOCATION - $5,000) 9 (DESIGN AND CONTINGENCIES - $41,000) 10 (15) SANDY LAKE, WALNUT STREET, BRIDGE 11 REPLACEMENT 230,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $200,000) 14 (LAND ALLOCATION - $5,000) 15 (DESIGN AND CONTINGENCIES - $25,000) 16 (16) PERRY TOWNSHIP, MILL ROAD, BRIDGE 17 REPLACEMENT 593,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $511,000) 20 (LAND ALLOCATION - $5,000) 21 (DESIGN AND CONTINGENCIES - $77,000) 22 (17) NEW VERNON TOWNSHIP, BETTY BOYDE 23 ROAD, BRIDGE REPLACEMENT 208,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $180,000) 26 (LAND ALLOCATION - $5,000) 27 (DESIGN AND CONTINGENCIES - $23,000) 28 (18) FAIRVIEW TOWNSHIP, GENGER ROAD, 29 BRIDGE REPLACEMENT 208,000 30 (BASE CONSTRUCTION ALLOCATION - 19910H1959B3288 - 143 -
1 $180,000) 2 (LAND ALLOCATION - $5,000) 3 (DESIGN AND CONTINGENCIES - $23,000) 4 (19) LAKE TOWNSHIP, STECKLER ROAD, BRIDGE 5 REPLACEMENT 230,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $200,000) 8 (LAND ALLOCATION - $5,000) 9 (DESIGN AND CONTINGENCIES - $25,000) 10 (20) SHENANGO TOWNSHIP, RIGGS ROAD, BRIDGE 11 REPLACEMENT 252,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $220,000) 14 (LAND ALLOCATION - $5,000) 15 (DESIGN AND CONTINGENCIES - $27,000) 16 (21) WOLF CREEK TOWNSHIP, GILL ROAD, 17 BRIDGE REPLACEMENT 230,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $200,000) 20 (LAND ALLOCATION - $5,000) 21 (DESIGN AND CONTINGENCIES - $25,000) 22 (22) GREENVILLE, RACE STREET, BRIDGE 23 REPLACEMENT 778,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $672,000) 26 (LAND ALLOCATION - $5,000) 27 (DESIGN AND CONTINGENCIES - $101,000) 28 (23) SUGAR GROVE TOWNSHIP, GARDNER HILL 29 ROAD, BRIDGE REPLACEMENT 230,000 30 (BASE CONSTRUCTION ALLOCATION - 19910H1959B3288 - 144 -
1 $200,000) 2 (LAND ALLOCATION - $5,000) 3 (DESIGN AND CONTINGENCIES - $25,000) 4 (24) FINDLEY TOWNSHIP, UBER ROAD, BRIDGE 5 REPLACEMENT 208,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $180,000) 8 (LAND ALLOCATION - $5,000) 9 (DESIGN AND CONTINGENCIES - $23,000) 10 (25) MILL CREEK TOWNSHIP, DEEMERS ROAD, 11 BRIDGE REPLACEMENT 285,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $250,000) 14 (LAND ALLOCATION - $5,000) 15 (DESIGN AND CONTINGENCIES - $30,000) 16 (26) WOLF CREEK TOWNSHIP, GILMORE ROAD, 17 BRIDGE REPLACEMENT 208,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $180,000) 20 (LAND ALLOCATION - $5,000) 21 (DESIGN AND CONTINGENCIES - $23,000) 22 (27) GROVE CITY, CHESTNUT STREET, BRIDGE 23 REPLACEMENT 2,871,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $2,666,000) 26 (LAND ALLOCATION - $5,000) 27 (DESIGN AND CONTINGENCIES - $200,000) 28 (28) SANDY CREEK TOWNSHIP, COUNTY LINE 29 ROAD, BRIDGE REPLACEMENT 297,000 30 (BASE CONSTRUCTION ALLOCATION - 19910H1959B3288 - 145 -
1 $254,000) 2 (LAND ALLOCATION - $5,000) 3 (DESIGN AND CONTINGENCIES - $38,000) 4 (29) LAKE TOWNSHIP, FARM ROAD, BRIDGE 5 REPLACEMENT 208,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $180,000) 8 (LAND ALLOCATION - $5,000) 9 (DESIGN AND CONTINGENCIES - $23,000) 10 (30) WEST MIDDLESEX, CEMETARY ROAD, BRIDGE 11 REPLACEMENT 297,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $254,000) 14 (LAND ALLOCATION - $5,000) 15 (DESIGN AND CONTINGENCIES - $38,000) 16 (31) JEFFERSON TOWNSHIP, CLAY FURNACE 17 ROAD, BRIDGE REPLACEMENT 208,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $180,000) 20 (LAND ALLOCATION - $5,000) 21 (DESIGN AND CONTINGENCIES - $23,000) 22 (32) JACKSON TOWNSHIP, FOX MINE ROAD, 23 BRIDGE REPLACEMENT 230,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $200,000) 26 (LAND ALLOCATION - $5,000) 27 (DESIGN AND CONTINGENCIES - $25,000) 28 (33) CITY OF HERMITAGE, T-388, KELLY ROAD 29 BRIDGE NO.1 OVER SHENANGO RIVER, BRIDGE 30 REPLACEMENT 851,000 19910H1959B3288 - 146 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $784,000) 3 (LAND ALLOCATION - $7,000) 4 (DESIGN AND CONTINGENCIES - $60,000) 5 (B) STATE BRIDGES 6 (1) S.R.0062 OVER SHENANGO RIVER, BRIDGE 7 REPLACEMENT 1,550,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $1,400,000) 10 (LAND ALLOCATION - $50,000) 11 (DESIGN AND CONTINGENCIES - $100,000) 12 (2) S.R.0062 OVER SOUTH DOCK VALLEY WAY, 13 BRIDGE REPLACEMENT 1,850,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $1,700,000) 16 (LAND ALLOCATION - $50,000) 17 (DESIGN AND CONTINGENCIES - $100,000) 18 (3) S.R.0062 OVER CONRAIL RAILROAD, BRIDGE 19 REPLACEMENT 1,750,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $1,600,000) 22 (LAND ALLOCATION - $50,000) 23 (DESIGN AND CONTINGENCIES - $100,000) 24 (4) S.R.0058 ON KINSMAN ROAD OVER SUGAR 25 RUN, GREENE TOWNSHIP, BRIDGE 26 REPLACEMENT 300,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $255,000) 29 (LAND ALLOCATION - $15,000) 30 (DESIGN AND CONTINGENCIES - $30,000) 19910H1959B3288 - 147 -
1 (5) S.R.3022 ON RUTLEDGE ROAD OVER 2 LACKAWANNOCK CREEK, JEFFERSON TOWNSHIP, 3 BRIDGE REPLACEMENT 300,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $255,000) 6 (LAND ALLOCATION - $15,000) 7 (DESIGN AND CONTINGENCIES - $30,000) 8 (6) S.R.0318 ON WEST MIDDLESEX-MERCER ROAD 9 OVER LITTLE NESHANNOCK CREEK, EAST 10 LACKAWANNOCK TOWNSHIP, BRIDGE 11 REPLACEMENT 430,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $365,000) 14 (LAND ALLOCATION - $20,000) 15 (DESIGN AND CONTINGENCIES - $45,000) 16 (7) S.R.3013 ON ORCHARD ROAD OVER 17 INTERSTATE 80, BMS 4330130070000, 18 LACKAWANNOCK TOWNSHIP, BRIDGE 19 REHABILITATION 900,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $765,000) 22 (LAND ALLOCATION - $45,000) 23 (DESIGN AND CONTINGENCIES - $90,000) 24 (8) S.R.0019 ON PERRY HIGHWAY OVER 25 TRIBUTARY OF LITTLE SHENANGO RIVER, 26 PERRY TOWNSHIP, BRIDGE REPLACEMENT 210,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $180,000) 29 (LAND ALLOCATION - $10,000) 30 (DESIGN AND CONTINGENCIES - $20,000) 19910H1959B3288 - 148 -
1 (9) S.R.0718 ON STATE STREET OVER SHENANGO 2 RIVER, CITY OF SHARON, BRIDGE 3 REHABILITATION 800,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $680,000) 6 (LAND ALLOCATION - $40,000) 7 (DESIGN AND CONTINGENCIES - $80,000) 8 SECTION 48. MIFFLIN COUNTY. 9 (A) LOCAL BRIDGES (RESERVED) 10 (B) STATE BRIDGES 11 (1) S.R.3021, NEWTON HAMILTON BRIDGE OVER 12 JUNIATA RIVER, NEWTON HAMILTON BOROUGH, 13 BRIDGE REPLACEMENT 5,250,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $4,750,000) 16 (LAND ALLOCATION - $200,000) 17 (DESIGN AND CONTINGENCIES - $300,000) 18 (2) S.R.0522 BRIDGE OVER BRANCH OF JACKS 19 CREEK, DECATUR TOWNSHIP, BRIDGE 20 REPLACEMENT 600,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $400,000) 23 (LAND ALLOCATION - $100,000) 24 (DESIGN AND CONTINGENCIES - $100,000) 25 (3) S.R.2007 BRIDGE OVER KISHACOQUILLAS 26 CREEK, DERRY TOWNSHIP, BRIDGE 27 REPLACEMENT 925,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $700,000) 30 (LAND ALLOCATION - $100,000) 19910H1959B3288 - 149 -
1 (DESIGN AND CONTINGENCIES - $125,000) 2 SECTION 49. MONROE COUNTY. 3 (A) LOCAL BRIDGES 4 (1) TUNKHANNOCK TOWNSHIP, T-629, OVER 5 TUNKHANNOCK CREEK, BRIDGE REPLACEMENT 190,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $140,000) 8 (LAND ALLOCATION - $20,000) 9 (DESIGN AND CONTINGENCIES - $30,000) 10 (2) TUNKHANNOCK TOWNSHIP, T-633, BRIDGE 11 OVER TUNKHANNOCK CREEK, BRIDGE 12 REPLACEMENT 139,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $121,000) 15 (LAND ALLOCATION - $6,000) 16 (DESIGN AND CONTINGENCIES - $12,000) 17 (3) STROUD TOWNSHIP, T-410 BRIDGE OVER 18 CHERRY CREEK, BRIDGE REPLACEMENT 127,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $110,000) 21 (LAND ALLOCATION - $6,000) 22 (DESIGN AND CONTINGENCIES - $11,000) 23 (4) HAMILTON TOWNSHIP, T-202, LAKE CIRCLE 24 BRIDGE, BRIDGE REPLACEMENT 126,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $101,000) 27 (LAND ALLOCATION - $5,000) 28 (DESIGN AND CONTINGENCIES - $20,000) 29 (5) HAMILTON TOWNSHIP, T-414, BRIDGE NO.7, 30 BRIDGE REPLACEMENT 522,000 19910H1959B3288 - 150 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $457,000) 3 (LAND ALLOCATION - $20,000) 4 (DESIGN AND CONTINGENCIES - $45,000) 5 (6) JACKSON TOWNSHIP, T-486, TROUT LAKE 6 BRIDGE, BRIDGE REPLACEMENT 184,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $160,000) 9 (LAND ALLOCATION - $8,000) 10 (DESIGN AND CONTINGENCIES - $16,000) 11 (7) STROUD TOWNSHIP, T-420, BRIDGE OVER 12 CHERRY CREEK, BRIDGE REPLACEMENT 169,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $143,000) 15 (LAND ALLOCATION - $6,000) 16 (DESIGN AND CONTINGENCIES - $20,000) 17 (8) SMITHFIELD TOWNSHIP, T-539, BRIDGE 18 OVER MARSHALLS CREEK, BRIDGE 19 REPLACEMENT 298,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $267,000) 22 (LAND ALLOCATION - $5,000) 23 (DESIGN AND CONTINGENCIES - $26,000) 24 (B) STATE BRIDGES 25 (1) S.R.0402 AT RESSICA FALLS, MIDDLE 26 SMITHFIELD TOWNSHIP, BRIDGE 27 REPLACEMENT 1,426,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $1,060,000) 30 (LAND ALLOCATION - $60,000) 19910H1959B3288 - 151 -
1 (DESIGN AND CONTINGENCIES - $306,000) 2 (2) S.R.0033 OVER S.R.0209, HAMILTON 3 TOWNSHIP, BRIDGE REPLACEMENT 195,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $177,000) 6 (DESIGN AND CONTINGENCIES - $18,000) 7 (3) S.R.2012 HAMILTON EAST ROAD OVER 8 MCMICHAEL CREEK, HAMILTON TOWNSHIP, 9 BRIDGE REPLACEMENT 140,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $100,000) 12 (LAND ALLOCATION - $20,000) 13 (DESIGN AND CONTINGENCIES - $20,000) 14 (4) S.R.2004 OVER S.R.0033, HAMILTON 15 TOWNSHIP, BRIDGE REPLACEMENT 335,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $304,000) 18 (DESIGN AND CONTINGENCIES - $31,000) 19 (5) S.R.2003 OVER CHERRY CREEK, HAMILTON 20 TOWNSHIP, BRIDGE REPLACEMENT 137,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $79,000) 23 (LAND ALLOCATION - $5,000) 24 (DESIGN AND CONTINGENCIES - $53,000) 25 (6) S.R.3018 OVER KETTLE CREEK II, 26 HAMILTON TOWNSHIP, BRIDGE REPLACEMENT 68,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $59,000) 29 (LAND ALLOCATION - $3,000) 30 (DESIGN AND CONTINGENCIES - $6,000) 19910H1959B3288 - 152 -
1 (7) S.R.3018 OVER KETTLE CREEK I, HAMILTON 2 TOWNSHIP, BRIDGE REPLACEMENT 80,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $70,000) 5 (LAND ALLOCATION - $3,000) 6 (DESIGN AND CONTINGENCIES - $7,000) 7 (8) S.R.2017 OVER I-80, EAST STROUDSBURG 8 BOROUGH, BRIDGE REPLACEMENT 381,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $317,000) 11 (DESIGN AND CONTINGENCIES - $64,000) 12 (9) S.R.0080 WATER GAP BRIDGE OVER CHERRY 13 CREEK, DELAWARE WATER GAP, BRIDGE 14 REPLACEMENT 795,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $723,000) 17 (DESIGN AND CONTINGENCIES - $72,000) 18 (10) S.R.0447 AT LEAVETTS BRANCH, BARRETT 19 TOWNSHIP, BRIDGE REPLACEMENT 255,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $175,000) 22 (LAND ALLOCATION - $10,000) 23 (DESIGN AND CONTINGENCIES - $70,000) 24 (11) S.R.0611 AT ERIE/LACKAWANNA RAILROAD, 25 COOLBAUGH TOWNSHIP, BRIDGE REPLACEMENT 608,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $521,000) 28 (LAND ALLOCATION - $10,000) 29 (DESIGN AND CONTINGENCIES - $77,000) 30 (12) S.R.0423 OVER TOBYHANNA CREEK, 19910H1959B3288 - 153 -
1 COOLBAUGH TOWNSHIP, BRIDGE REPLACEMENT 194,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $163,000) 4 (DESIGN AND CONTINGENCIES - $31,000) 5 (13) S.R.2030 OVER I-80, DELAWARE WATER 6 GAP, BRIDGE REPLACEMENT 450,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $409,000) 9 (DESIGN AND CONTINGENCIES - $41,000) 10 (14) S.R.1014 OVER WALLENPAUPACK CREEK, 11 COOLBAUGH TOWNSHIP, BRIDGE REPLACEMENT 140,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $100,000) 14 (LAND ALLOCATION - $20,000) 15 (DESIGN AND CONTINGENCIES - $20,000) 16 (15) S.R.4007 OVER STEAMTOWN RAILROAD, 17 MOUNT POCONO BOROUGH, BRIDGE 18 REPLACEMENT 820,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $700,000) 21 (LAND ALLOCATION - $50,000) 22 (DESIGN AND CONTINGENCIES - $70,000) 23 (16) S.R.3022 OVER MCMICHAELS CREEK, 24 HAMILTON TOWNSHIP, BRIDGE REPLACEMENT 161,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $140,000) 27 (LAND ALLOCATION - $7,000) 28 (DESIGN AND CONTINGENCIES - $14,000) 29 (17) S.R.4001 AT LONG POND, TUNKHANNOCK 30 TOWNSHIP, BRIDGE REPLACEMENT 425,000 19910H1959B3288 - 154 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $300,000) 3 (LAND ALLOCATION - $50,000) 4 (DESIGN AND CONTINGENCIES - $75,000) 5 (18) S.R.0940 AT POCONO SUMMIT, TOBYHANNA 6 TOWNSHIP, BRIDGE REPLACEMENT 4,850,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $4,600,000) 9 (LAND ALLOCATION - $50,000) 10 (DESIGN AND CONTINGENCIES - $200,000) 11 (19) S.R.0940 OVER TOBYHANNA CREEK, 12 TOBYHANNA TOWNSHIP, BRIDGE REPLACEMENT 1,240,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $1,100,000) 15 (LAND ALLOCATION - $60,000) 16 (DESIGN AND CONTINGENCIES - $80,000) 17 (20) S.R.0191 OVER MCMICHAELS CREEK, 18 STROUDSBURG BOROUGH, BRIDGE 19 REPLACEMENT 520,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $472,000) 22 (DESIGN AND CONTINGENCIES - $48,000) 23 (21) S.R.0191 UNDER RAILROAD, POCONO 24 TOWNSHIP, BRIDGE REPLACEMENT 1,400,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $1,000,000) 27 (LAND ALLOCATION - $200,000) 28 (DESIGN AND CONTINGENCIES - $200,000) 29 (22) S.R.0209 OVER I-80, SMITHFIELD 30 TOWNSHIP, BRIDGE REPLACEMENT 368,000 19910H1959B3288 - 155 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $334,000) 3 (DESIGN AND CONTINGENCIES - $34,000) 4 (23) S.R.8024 AT I-80 RAMP, SMITHFIELD 5 TOWNSHIP, BRIDGE REPLACEMENT 759,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $690,000) 8 (DESIGN AND CONTINGENCIES - $69,000) 9 (24) S.R.1005 OVER BUFFALO RUN, STROUD 10 TOWNSHIP, BRIDGE REPLACEMENT 103,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $90,000) 13 (LAND ALLOCATION - $4,000) 14 (DESIGN AND CONTINGENCIES - $9,000) 15 (25) S.R.0191 OVER BROADHEAD CREEK, STROUD 16 TOWNSHIP, BRIDGE REPLACEMENT 843,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $648,000) 19 (LAND ALLOCATION - $65,000) 20 (DESIGN AND CONTINGENCIES - $130,000) 21 (26) S.R.3022 OVER MCMICHAEL CREEK, 22 HAMILTON TOWNSHIP, BRIDGE REPLACEMENT 161,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $140,000) 25 (LAND ALLOCATION - $7,000) 26 (DESIGN AND CONTINGENCIES - $14,000) 27 SECTION 50. MONTGOMERY COUNTY. 28 (A) LOCAL BRIDGES 29 (1) CHELTENHAM TOWNSHIP, MILL ROAD BRIDGE 30 OVER TOOKANY CREEK BETWEEN CHURCH ROAD 19910H1959B3288 - 156 -
1 AND HARRISON AVENUE, ELKINS PARK, 2 BRIDGE REPLACEMENT 360,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $300,000) 5 (LAND ALLOCATION - $15,000) 6 (DESIGN AND CONTINGENCIES - $45,000) 7 (2) CHELTENHAM TOWNSHIP, FOREST AVENUE 8 BRIDGE OVER TOOKANY CREEK AT THE 9 INTERSECTION OF FOREST AVENUE AND 10 SHOEMAKER ROAD, ELKINS PARK, BRIDGE 11 REPLACEMENT 285,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $250,000) 14 (DESIGN AND CONTINGENCIES - $35,000) 15 (3) CHELTENHAM TOWNSHIP, SERPENTINE LANE 16 BRIDGE OVER ROCK LANE CREEK BETWEEN 17 ROCK LANE AND IVY LANE, ELKINS PARK, 18 BRIDGE REPLACEMENT 230,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $200,000) 21 (DESIGN AND CONTINGENCIES - $30,000) 22 (4) CHELTENHAM TOWNSHIP, TOOKANY CREEK 23 PARKWAY BRIDGE OVER TOOKANY CREEK 500 24 FEET EAST OF NEW SECOND STREET, ELKINS 25 PARK, BRIDGE REPLACEMENT 345,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $300,000) 28 (DESIGN AND CONTINGENCIES - $45,000) 29 (5) CHELTENHAM TOWNSHIP, ASHMEAD ROAD 30 BRIDGE OVER TOOKANY CREEK 100 FEET 19910H1959B3288 - 157 -
1 SOUTH OF TOOKANY CREEK PARKWAY, 2 CHELTENHAM, BRIDGE REPLACEMENT 400,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $350,000) 5 (DESIGN AND CONTINGENCIES - $50,000) 6 (6) TRAPPE BOROUGH AND PERKIOMEN TOWNSHIP, 7 BETCHER ROAD BRIDGE OVER BRANCH OF 8 SCHOOL HOUSE RUN, BRIDGE REPLACEMENT 73,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $66,000) 11 (DESIGN AND CONTINGENCIES - $7,000) 12 (7) TRAPPE BOROUGH, WEST FIRST AVENUE 13 BRIDGE OVER DONNY BROOK CREEK, BRIDGE 14 REPLACEMENT 49,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $44,000) 17 (DESIGN AND CONTINGENCIES - $5,000) 18 (8) ABINGTON TOWNSHIP, REVELATION ROAD, 19 BRIDGE REPLACEMENT 600,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $400,000) 22 (LAND ALLOCATION - $100,000) 23 (DESIGN AND CONTINGENCIES - $100,000) 24 (9) ABINGTON TOWNSHIP, OSCEOLA AVENUE, 25 BRIDGE REPLACEMENT 300,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $200,000) 28 (LAND ALLOCATION - $50,000) 29 (DESIGN AND CONTINGENCIES - $50,000) 30 (10) ABINGTON TOWNSHIP, CADWALADER AVENUE, 19910H1959B3288 - 158 -
1 BRIDGE REPLACEMENT 300,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $200,000) 4 (LAND ALLOCATION - $50,000) 5 (DESIGN AND CONTINGENCIES - $50,000) 6 (11) ABINGTON TOWNSHIP, TULPEHOCKEN 7 AVENUE, BRIDGE REPLACEMENT 300,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $200,000) 10 (LAND ALLOCATION - $50,000) 11 (DESIGN AND CONTINGENCIES - $50,000) 12 (12) ABINGTON TOWNSHIP, RYDAL ROAD AT 13 CLOVERLY LANE, BRIDGE REPLACEMENT 300,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $200,000) 16 (LAND ALLOCATION - $50,000) 17 (DESIGN AND CONTINGENCIES - $50,000) 18 (13) ABINGTON TOWNSHIP, MEADOWBROOK ROAD 19 BETWEEN STOCTON ROAD AND VALLEY ROAD, 20 BRIDGE REPLACEMENT 425,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $300,000) 23 (LAND ALLOCATION - $50,000) 24 (DESIGN AND CONTINGENCIES - $75,000) 25 (14) ABINGTON TOWNSHIP, STOCTON ROAD AT 26 MEADOWBROOK ROAD, BRIDGE REPLACEMENT 350,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $250,000) 29 (LAND ALLOCATION - $50,000) 30 (DESIGN AND CONTINGENCIES - $50,000) 19910H1959B3288 - 159 -
1 (15) ABINGTON TOWNSHIP, PAUL BROOK LANE, 2 BRIDGE REPLACEMENT 350,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $250,000) 5 (LAND ALLOCATION - $50,000) 6 (DESIGN AND CONTINGENCIES - $50,000) 7 (16) ABINGTON TOWNSHIP, JOHNSTON AVENUE AT 8 RADCLIFFE AVENUE, BRIDGE REPLACEMENT 550,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $400,000) 11 (LAND ALLOCATION - $50,000) 12 (DESIGN AND CONTINGENCIES - $100,000) 13 (17) ABINGTON TOWNSHIP, WASHINGTON LANE, 14 300 FEET SOUTH OF FROG HOLLOW ROAD, 15 BRIDGE REPLACEMENT 2,700,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $2,000,000) 18 (LAND ALLOCATION - $200,000) 19 (DESIGN AND CONTINGENCIES - $500,000) 20 (18) ABINGTON TOWNSHIP, L.R.46115, STATION 21 50-98, NORTH HILLS AVENUE, BRIDGE 22 REPLACEMENT 340,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $200,000) 25 (LAND ALLOCATION - $100,000) 26 (DESIGN AND CONTINGENCIES - $40,000) 27 (19) PLYMOUTH TOWNSHIP, BELVOIR ROAD 28 BRIDGE OVER SAW MILL CREEK, BRIDGE 29 REPLACEMENT 445,000 30 (BASE CONSTRUCTION ALLOCATION - 19910H1959B3288 - 160 -
1 $400,000) 2 (DESIGN AND CONTINGENCIES - $45,000) 3 (B) STATE BRIDGES 4 (1) S.R.3051, OLD BETZWOOD BRIDGE OVER 5 SCHUYLKILL RIVER, WEST NORRITON AND 6 UPPER MERION TOWNSHIPS, BRIDGE 7 REPLACEMENT 5,500,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $4,800,000) 10 (LAND ALLOCATION - $150,000) 11 (DESIGN AND CONTINGENCIES - $550,000) 12 (2) S.R.4040, GILBERTSVILLE ROAD BRIDGE 13 OVER BRANCH OF MINISTER CREEK, DOUGLASS 14 TOWNSHIP, BRIDGE REPLACEMENT 215,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $175,000) 17 (LAND ALLOCATION - $20,000) 18 (DESIGN AND CONTINGENCIES - $20,000) 19 (3) S.R.3020, DANNE HOWER BRIDGE OVER 20 SCHUYLKILL RIVER, UPPER MERION AND 21 NORRISTOWN, BRIDGE DECK REHABILITATION 11,000,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $10,450,000) 24 (DESIGN AND CONTINGENCIES - $550,000) 25 (4) S.R.0100, PA.100 SOUTH OF PA.724 TO 26 BERKS COUNTY LINE, 11 BRIDGES 27 APPROXIMATELY, DOUGLASS, UPPER 28 POTTSGROVE, POTTSTOWN AND NORTH 29 COVENTRY TOWNSHIPS, BRIDGE DECK 30 REHABILITATION 3,800,000 19910H1959B3288 - 161 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $3,610,000) 3 (DESIGN AND CONTINGENCIES - $190,000) 4 (5) S.R.0063, WELSH ROAD BRIDGE OVER 5 PENNYPACK CREEK, LOWER MORELAND 6 TOWNSHIP, BRIDGE REPLACEMENT 215,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $175,000) 9 (LAND ALLOCATION - $20,000) 10 (DESIGN AND CONTINGENCIES - $20,000) 11 (6) S.R.0073, WASHINGTON LANE BRIDGE OVER 12 SEPTA, CHELTENHAM TOWNSHIP, BRIDGE DECK 13 REHABILITATION 2,990,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $2,840,000) 16 (DESIGN AND CONTINGENCIES - $150,000) 17 (7) S.R.2034, EDGEHILL ROAD AND YORK ROAD, 18 ABINGTON TOWNSHIP, BRIDGE DECK 19 REHABILITATION 250,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $237,000) 22 (DESIGN AND CONTINGENCIES - $13,000) 23 (8) S.R.2025, CENTRAL AVENUE BRIDGE OVER 24 TACONY CREEK, CHELTENHAM TOWNSHIP, 25 BRIDGE REPLACEMENT 650,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $500,000) 28 (LAND ALLOCATION - $75,000) 29 (DESIGN AND CONTINGENCIES - $75,000) 30 (9) MEETINGHOUSE ROAD, BRIDGE OVER BRANCH 19910H1959B3288 - 162 -
1 OF TACONY CREEK, ABINGTON TOWNSHIP, 2 BRIDGE REPLACEMENT 285,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $160,000) 5 (LAND ALLOCATION - $100,000) 6 (DESIGN AND CONTINGENCIES - $25,000) 7 (10) MILL ROAD BRIDGE OVER MEADOWBROOK 8 CREEK, ABINGTON TOWNSHIP, BRIDGE 9 REPLACEMENT 2,100,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $1,500,000) 12 (LAND ALLOCATION - $200,000) 13 (DESIGN AND CONTINGENCIES - $400,000) 14 SECTION 51. MONTOUR COUNTY. 15 (A) LOCAL BRIDGES (RESERVED) 16 (B) STATE BRIDGES 17 (1) S.R.3006 BRIDGE OVER BRANCH OF BEAVER 18 RUN, LIBERTY TOWNSHIP, BRIDGE 19 REPLACEMENT 322,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $269,000) 22 (LAND ALLOCATION - $30,000) 23 (DESIGN AND CONTINGENCIES - $23,000) 24 (2) S.R.0054, DANVILLE - RIVERSIDE BRIDGE 25 OVER SUSQUEHANNA RIVER, DANVILLE 26 BOROUGH, BRIDGE REHABILITATION 1,430,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $1,300,000) 29 (DESIGN AND CONTINGENCIES - $130,000) 30 SECTION 52. NORTHAMPTON COUNTY. 19910H1959B3288 - 163 -
1 (A) LOCAL BRIDGES 2 (1) CITY OF EASTON, MARKET STREET, BRIDGE 3 REPLACEMENT 83,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $72,000) 6 (DESIGN AND CONTINGENCIES - $11,000) 7 (2) CITY OF EASTON, CHURCH STREET, BRIDGE 8 REPLACEMENT 28,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $25,000) 11 (DESIGN AND CONTINGENCIES - $3,000) 12 (3) BUSHKILL TOWNSHIP, T-638, KELLER ROAD 13 OVER TRIBUTARY TO BUSHKILL CREEK, 14 BRIDGE REPLACEMENT 110,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $70,000) 17 (LAND ALLOCATION - $10,000) 18 (DESIGN AND CONTINGENCIES - $30,000) 19 (4) PLAINFIELD TOWNSHIP, T-629, COUNTY 20 BRIDGE NO.207 OVER WIND GAP CREEK, 21 BRIDGE REPLACEMENT 150,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $115,000) 24 (LAND ALLOCATION - $10,000) 25 (DESIGN AND CONTINGENCIES - $25,000) 26 (5) CITY OF EASTON, BUSHKILL DRIVE OVER 27 BUSHKILL CREEK, BRIDGE REPLACEMENT 530,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $450,000) 30 (LAND ALLOCATION - $10,000) 19910H1959B3288 - 164 -
1 (DESIGN AND CONTINGENCIES - $70,000) 2 (6) ALLEN TOWNSHIP, T-465B, ATLAS ROAD 3 OVER DRY RUN CREEK, BRIDGE REPLACEMENT 145,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $110,000) 6 (LAND ALLOCATION - $10,000) 7 (DESIGN AND CONTINGENCIES - $25,000) 8 (7) UPPER MOUNT BETHEL TOWNSHIP, T-701, 9 COUNTY BRIDGE NO.221 OVER JACOBY CREEK, 10 BRIDGE REPLACEMENT 145,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $110,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $25,000) 15 (8) LOWER MOUNT BETHEL TOWNSHIP, T-663, 16 COUNTY BRIDGE NO.202 OVER OUGHOUGHTON 17 CREEK, BRIDGE REPLACEMENT 180,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $140,000) 20 (LAND ALLOCATION - $10,000) 21 (DESIGN AND CONTINGENCIES - $30,000) 22 (9) MOORE TOWNSHIP, T-588, COUNTY BRIDGE 23 NO.146 OVER HOKENDAQUA CREEK, BRIDGE 24 REPLACEMENT 175,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $135,000) 27 (LAND ALLOCATION - $10,000) 28 (DESIGN AND CONTINGENCIES - $30,000) 29 (10) LOWER NAZARETH TOWNSHIP, T-436, 30 COUNTY BRIDGE NO.102 OVER MONOCACY 19910H1959B3288 - 165 -
1 CREEK, BRIDGE REPLACEMENT 300,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $250,000) 4 (LAND ALLOCATION - $15,000) 5 (DESIGN AND CONTINGENCIES - $35,000) 6 (11) FREEMANSBURG BOROUGH, CHURCH STREET 7 BRIDGE OVER CONRAIL, BRIDGE 8 REPLACEMENT 190,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $165,000) 11 (LAND ALLOCATION - $10,000) 12 (DESIGN AND CONTINGENCIES - $15,000) 13 (12) FREEMANSBURG BOROUGH, MARKET STREET 14 BRIDGE OVER CONRAIL, BRIDGE 15 REPLACEMENT 190,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $165,000) 18 (LAND ALLOCATION - $10,000) 19 (DESIGN AND CONTINGENCIES - $15,000) 20 (13) CITY OF BETHLEHEM, LYNN AVENUE BRIDGE 21 BETWEEN S.R.0412 AND EAST 6TH STREET, 22 BRIDGE REPLACEMENT 1,857,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $1,572,000) 25 (LAND ALLOCATION - $15,000) 26 (DESIGN AND CONTINGENCIES - $270,000) 27 (B) STATE BRIDGES 28 (1) S.R.0611 FRONT STREET OVER BUSHKILL 29 CREEK, CITY OF EASTON, BRIDGE 30 REPLACEMENT 1,139,000 19910H1959B3288 - 166 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $1,035,000) 3 (DESIGN AND CONTINGENCIES - $104,000) 4 (2) S.R.3020 OVER EAST BRANCH OF THE 5 MONOCACY CREEK, UPPER NAZARETH 6 TOWNSHIP, BRIDGE REPLACEMENT 227,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $174,000) 9 (LAND ALLOCATION - $35,000) 10 (DESIGN AND CONTINGENCIES - $18,000) 11 (3) S.R.3020 OVER TRIBUTARY TO MONOCACY 12 CREEK NEAR GEORGETOWN ROAD, LOWER 13 NAZARETH TOWNSHIP, BRIDGE REPLACEMENT 271,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $208,000) 16 (LAND ALLOCATION - $42,000) 17 (DESIGN AND CONTINGENCIES - $21,000) 18 (4) S.R.1012 OVER BUSHKILL CREEK, BUSHKILL 19 TOWNSHIP, BRIDGE REPLACEMENT 222,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $201,000) 22 (DESIGN AND CONTINGENCIES - $21,000) 23 (5) S.R.2017 13TH STREET OVER S.R.0022, 24 CITY OF EASTON BRIDGE REPLACEMENT 465,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $422,000) 27 (DESIGN AND CONTINGENCIES - $43,000) 28 (6) S.R.4006 WHITETAIL DEER DRIVE OVER 29 WEST BRANCH OF MONOCACY CREEK, MOORE 30 TOWNSHIP, BRIDGE REPLACEMENT 169,000 19910H1959B3288 - 167 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $130,000) 3 (LAND ALLOCATION - $26,000) 4 (DESIGN AND CONTINGENCIES - $13,000) 5 (7) S.R.0329 OVER LIMESTONE QUARRY, ALLEN 6 TOWNSHIP, BRIDGE REPLACEMENT 464,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $356,000) 9 (LAND ALLOCATION - $72,000) 10 (DESIGN AND CONTINGENCIES - $36,000) 11 (8) S.R.0329 OVER DRY RUN, ALLEN TOWNSHIP, 12 BRIDGE REPLACEMENT 146,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $111,000) 15 (LAND ALLOCATION - $23,000) 16 (DESIGN AND CONTINGENCIES - $12,000) 17 (9) S.R.0329 OVER HOKENDAQUA CREEK, 18 NORTHAMPTON BOROUGH, BRIDGE 19 REPLACEMENT 812,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $624,000) 22 (LAND ALLOCATION - $125,000) 23 (DESIGN AND CONTINGENCIES - $63,000) 24 SECTION 53. NORTHUMBERLAND COUNTY. 25 (A) LOCAL BRIDGES 26 (1) WEST CAMERON TOWNSHIP, T-480, COUNTY 27 BRIDGE NO.167 OVER MAHANOY CREEK, 28 BRIDGE REPLACEMENT 815,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $652,000) 19910H1959B3288 - 168 -
1 (DESIGN AND CONTINGENCIES - $163,000) 2 (2) MOUNT CARMEL BOROUGH, NORTH VINE 3 STREET BRIDGE OVER SHAMOKIN CREEK, 4 BRIDGE REHABILITATION 320,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $240,000) 7 (DESIGN AND CONTINGENCIES - $80,000) 8 (3) MILTON BOROUGH, BROWN AVENUE BRIDGE 9 OVER LIMESTONE RUN, BRIDGE REPLACEMENT 400,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $320,000) 12 (DESIGN AND CONTINGENCIES - $80,000) 13 (4) MILTON BOROUGH, FILBERT STREET BRIDGE 14 OVER LIMESTONE RUN, BRIDGE REPLACEMENT 650,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $500,000) 17 (DESIGN AND CONTINGENCIES - $150,000) 18 (B) STATE BRIDGES 19 (1) S.R.3012, FIDDLERS RUN BRIDGE OVER 20 FIDDLERS RUN, JACKSON AND LOWER MAHANOY 21 TOWNSHIPS BRIDGE REPLACEMENT 407,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $326,000) 24 (LAND ALLOCATION - $20,000) 25 (DESIGN AND CONTINGENCIES - $61,000) 26 (2) S.R.2016 BRIDGE OVER SHAMOKIN CREEK, 27 SHAMOKIN TOWNSHIP, BRIDGE REPLACEMENT 789,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $631,000) 30 (LAND ALLOCATION - $39,000) 19910H1959B3288 - 169 -
1 (DESIGN AND CONTINGENCIES - $119,000) 2 (3) S.R.2017 BRIDGE OVER COAL RUN, COAL 3 TOWNSHIP, BRIDGE REPLACEMENT 436,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $349,000) 6 (LAND ALLOCATION - $22,000) 7 (DESIGN AND CONTINGENCIES - $65,000) 8 SECTION 54. PERRY COUNTY. 9 (A) LOCAL BRIDGES (RESERVED) 10 (B) STATE BRIDGES 11 (1) S.R.50014, DELVILLE ROAD BRIDGE OVER 12 SHERMAN CREEK, PENN TOWNSHIP, BRIDGE 13 REPLACEMENT 1,250,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $1,079,000) 16 (LAND ALLOCATION - $10,000) 17 (DESIGN AND CONTINGENCIES - $161,000) 18 (2) S.R.50014, DELVILLE ROAD BRIDGE OVER 19 SHERMAN CREEK, PENN AND WHEATFIELD 20 TOWNSHIPS, BRIDGE REPLACEMENT 1,272,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $1,099,000) 23 (LAND ALLOCATION - $8,000) 24 (DESIGN AND CONTINGENCIES - $165,000) 25 (3) S.R.3009, SHERMANS CREEK BRIDGE OVER 26 SHERMANS CREEK, SOUTHWEST MADISON 27 TOWNSHIP, BRIDGE REPLACEMENT 730,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $610,000) 30 (LAND ALLOCATION - $20,000) 19910H1959B3288 - 170 -
1 (DESIGN AND CONTINGENCIES - $100,000) 2 SECTION 55. PHILADELPHIA COUNTY. 3 (A) LOCAL BRIDGES (RESERVED) 4 (B) STATE BRIDGES 5 (1) S.R.1002, ADAMS AVENUE BRIDGE OVER 6 TACONY CREEK, CITY OF PHILADELPHIA, 7 BRIDGE REHABILITATION 1,200,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $850,000) 10 (LAND ALLOCATION - $100,000) 11 (DESIGN AND CONTINGENCIES - $250,000) 12 (2) S.R.4006, CITY AVENUE S.B. OVER 13 SCHUYLKILL, CITY OF PHILADELPHIA, 14 BRIDGE DECK REPLACEMENT 7,950,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $7,500,000) 17 (LAND ALLOCATION - $100,000) 18 (DESIGN AND CONTINGENCIES - $350,000) 19 (3) S.R.0063, WOODHAVEN ROAD: U.S. 1 TO I- 20 95, 6 BRIDGES, PHILADELPHIA AND 21 BENSALEM TOWNSHIPS, BRIDGE DECK 22 REHABILITATION 3,500,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $3,325,000) 25 (DESIGN AND CONTINGENCIES - $175,000) 26 SECTION 56. PIKE COUNTY. 27 (A) LOCAL BRIDGES 28 (1) MILFORD BOROUGH AND DINGMAN TOWNSHIP, 29 T-426, MOTT STREET BRIDGE NO.21 OVER 30 SAWKILL CREEK, BRIDGE REPLACEMENT 1,550,000 19910H1959B3288 - 171 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $1,310,000) 3 (LAND ALLOCATION - $40,000) 4 (DESIGN AND CONTINGENCIES - $200,000) 5 (2) SHOHOLA TOWNSHIP, T-440, AUMULLER 6 BRIDGE NO.24 OVER BALLIARD CREEK, 7 BRIDGE REPLACEMENT 210,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $165,000) 10 (LAND ALLOCATION - $20,000) 11 (DESIGN AND CONTINGENCIES - $25,000) 12 (3) PORTER TOWNSHIP, T-317, BRIDGE NO.5 13 OVER BIG BUSHKILL CREEK, BRIDGE 14 REPLACEMENT 450,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $370,000) 17 (LAND ALLOCATION - $25,000) 18 (DESIGN AND CONTINGENCIES - $55,000) 19 (4) PORTER TOWNSHIP, T-317, BRIDGE NO.4 20 OVER SPRUCE RUN, BRIDGE REPLACEMENT 135,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $100,000) 23 (LAND ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $15,000) 25 (5) DINGMAN TOWNSHIP, T-424, BRIDGE NO.5 26 RATTLESNAKE BRIDGE OVER RATTLESNAKE 27 CREEK, BRIDGE REPLACEMENT 210,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $165,000) 30 (LAND ALLOCATION - $20,000) 19910H1959B3288 - 172 -
1 (DESIGN AND CONTINGENCIES - $25,000) 2 (B) STATE BRIDGES 3 (1) S.R.0006 BRIDGE OVER DELAWARE RIVER, 4 MATAMORAS BOROUGH, BRIDGE REPLACEMENT 330,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $300,000) 7 (DESIGN AND CONTINGENCIES - $30,000) 8 (2) S.R.0084 BRIDGE OVER DELAWARE RIVER, 9 MATAMORAS BOROUGH, BRIDGE REPLACEMENT 700,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $600,000) 12 (DESIGN AND CONTINGENCIES - $100,000) 13 (3) S.R.0402 BRIDGE OVER BLOOMING GROVE 14 CREEK, BLOOMING GROVE TOWNSHIP, BRIDGE 15 REPLACEMENT 460,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $400,000) 18 (LAND ALLOCATION - $10,000) 19 (DESIGN AND CONTINGENCIES - $50,000) 20 (4) S.R.2001 BRIDGE OVER TOMS CREEK, 21 LEHMAN TOWNSHIP, BRIDGE REPLACEMENT 536,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $470,000) 24 (LAND ALLOCATION - $10,000) 25 (DESIGN AND CONTINGENCIES - $56,000) 26 (5) S.R.2001 BRIDGE OVER BRANCH OF 27 VALENTINE BROOK, MILFORD BOROUGH, 28 BRIDGE REPLACEMENT 570,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $500,000) 19910H1959B3288 - 173 -
1 (LAND ALLOCATION - $10,000) 2 (DESIGN AND CONTINGENCIES - $60,000) 3 (6) S.R.0507 BRIDGE OVER TRIBUTARY TO 4 WALLENPAUPACK CREEK, PALMYRA TOWNSHIP, 5 BRIDGE REPLACEMENT 460,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $400,000) 8 (LAND ALLOCATION - $10,000) 9 (DESIGN AND CONTINGENCIES - $50,000) 10 (7) S.R.0209 BRIDGE OVER SAWSKILL CREEK, 11 MILFORD BOROUGH, BRIDGE REPLACEMENT 2,280,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $2,020,000) 14 (LAND ALLOCATION - $20,000) 15 (DESIGN AND CONTINGENCIES - $240,000) 16 SECTION 57. POTTER COUNTY. 17 (A) LOCAL BRIDGES (RESERVED) 18 (B) STATE BRIDGES 19 (1) S.R.0044, KETTLE CREEK BRIDGE OVER 20 KETTLE CREEK, STEWARDSON TOWNSHIP, 21 BRIDGE REPLACEMENT 1,150,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $900,000) 24 (LAND ALLOCATION - $100,000) 25 (DESIGN AND CONTINGENCIES - $150,000) 26 (2) S.R.0044 BRIDGE OVER KETTLE CREEK, 27 STEWARDSON TOWNSHIP, BRIDGE 28 REPLACEMENT 1,150,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $900,000) 19910H1959B3288 - 174 -
1 (LAND ALLOCATION - $100,000) 2 (DESIGN AND CONTINGENCIES - $150,000) 3 (3) S.R.0006 BRIDGE OVER ALLEGHENY RIVER, 4 COUDERSPORT BOROUGH, BRIDGE 5 REPLACEMENT 1,500,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $1,250,000) 8 (LAND ALLOCATION - $100,000) 9 (DESIGN AND CONTINGENCIES - $150,000) 10 (4) S.R.0044 BRIDGE OVER SHARON CREEK, 11 SHARON TOWNSHIP, BRIDGE REPLACEMENT 800,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $600,000) 14 (LAND ALLOCATION - $100,000) 15 (DESIGN AND CONTINGENCIES - $100,000) 16 (5) S.R.0244 BRIDGE OVER ELLISBURG CREEK, 17 GENESEE TOWNSHIP, BRIDGE REPLACEMENT 650,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $450,000) 20 (LAND ALLOCATION - $100,000) 21 (DESIGN AND CONTINGENCIES - $100,000) 22 (6) S.R.1010 BRIDGE OVER GENESEE RIVER, 23 GENESEE TOWNSHIP, BRIDGE REPLACEMENT 1,600,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $1,250,000) 26 (LAND ALLOCATION - $150,000) 27 (DESIGN AND CONTINGENCIES - $200,000) 28 (7) S.R.1011, BRIDGE NO.2 OVER GENESEE 29 RIVER, GENESEE TOWNSHIP, BRIDGE 30 REPLACEMENT 850,000 19910H1959B3288 - 175 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $650,000) 3 (LAND ALLOCATION - $100,000) 4 (DESIGN AND CONTINGENCIES - $100,000) 5 (8) S.R.1020 BRIDGE OVER WEST BRANCH OF 6 PINE CREEK, GALETON BOROUGH, BRIDGE 7 REPLACEMENT 1,525,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $1,250,000) 10 (LAND ALLOCATION - $100,000) 11 (DESIGN AND CONTINGENCIES - $175,000) 12 (9) S.R.1024 BRIDGE OVER PINE CREEK, 13 ULYSSES TOWNSHIP, BRIDGE REPLACEMENT 450,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $250,000) 16 (LAND ALLOCATION - $100,000) 17 (DESIGN AND CONTINGENCIES - $100,000) 18 (10) S.R.1024 BRIDGE OVER GENESEE FORK OF 19 PINE CREEK, ULYSSES TOWNSHIP, BRIDGE 20 REPLACEMENT 1,300,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $1,000,000) 23 (LAND ALLOCATION - $150,000) 24 (DESIGN AND CONTINGENCIES - $150,000) 25 (11) S.R.4003 BRIDGE OVER FISHING CREEK, 26 ROULETTE TOWNSHIP, BRIDGE REPLACEMENT 950,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $750,000) 29 (LAND ALLOCATION - $100,000) 30 (DESIGN AND CONTINGENCIES - $100,000) 19910H1959B3288 - 176 -
1 SECTION 58. SCHUYLKILL COUNTY. 2 (A) LOCAL BRIDGES 3 (1) NORTH UNION TOWNSHIP, T-455 OVER 4 TOMHICKEN CREEK, BRIDGE REPLACEMENT 178,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $138,000) 7 (LAND ALLOCATION - $10,000) 8 (DESIGN AND CONTINGENCIES - $30,000) 9 (2) UNION TOWNSHIP, T-794 OVER LITTLE 10 CATAWISSA CREEK, BRIDGE REPLACEMENT 180,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $140,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $30,000) 15 (3) BRANCH TOWNSHIP, T-564, DIAMOND STREET 16 OVER WEST CREEK, BRIDGE REPLACEMENT 190,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $150,000) 19 (LAND ALLOCATION - $10,000) 20 (DESIGN AND CONTINGENCIES - $30,000) 21 (4) EAST BRUNSWICK TOWNSHIP, T-757 OVER 22 INDIAN RUN, BRIDGE REPLACEMENT 155,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $115,000) 25 (LAND ALLOCATION - $10,000) 26 (DESIGN AND CONTINGENCIES - $30,000) 27 (5) HEGINS TOWNSHIP, T-388, WOOD LANE 28 BRIDGE OVER DEEP CREEK, BRIDGE 29 REPLACEMENT 220,000 30 (BASE CONSTRUCTION ALLOCATION - 19910H1959B3288 - 177 -
1 $175,000) 2 (LAND ALLOCATION - $10,000) 3 (DESIGN AND CONTINGENCIES - $35,000) 4 (6) BARRY TOWNSHIP, T-577, COUNTY BRIDGE 5 NO.7 OVER DEEP CREEK, BRIDGE 6 REPLACEMENT 155,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $115,000) 9 (LAND ALLOCATION - $10,000) 10 (DESIGN AND CONTINGENCIES - $30,000) 11 (7) PORTER TOWNSHIP, T-418, COUNTY BRIDGE 12 NO.67 OVER WISCONISCO CREEK, BRIDGE 13 REPLACEMENT 235,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $180,000) 16 (LAND ALLOCATION - $15,000) 17 (DESIGN AND CONTINGENCIES - $40,000) 18 (8) PINE GROVE TOWNSHIP, T-406, COUNTY 19 BRIDGE NO.108 OVER LITTLE SWATARA 20 CREEK, BRIDGE REPLACEMENT 395,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $325,000) 23 (LAND ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $50,000) 25 (9) WEST BRUNSWICK TOWNSHIP, T-723, 26 INDUSTRIAL PARK ROAD BRIDGE OVER PINE 27 CREEK, BRIDGE REPLACEMENT 420,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $350,000) 30 (LAND ALLOCATION - $20,000) 19910H1959B3288 - 178 -
1 (DESIGN AND CONTINGENCIES - $50,000) 2 (10) HEGINS TOWNSHIP, T-474, GAP SCHOOL 3 ROAD BRIDGE OVER RAUSCH CREEK, BRIDGE 4 REPLACEMENT 150,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $110,000) 7 (LAND ALLOCATION - $10,000) 8 (DESIGN AND CONTINGENCIES - $30,000) 9 (11) HEGINS TOWNSHIP, T-474, GAP SCHOOL 10 ROAD BRIDGE OVER PINE CREEK, BRIDGE 11 REPLACEMENT 185,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $145,000) 14 (LAND ALLOCATION - $10,000) 15 (DESIGN AND CONTINGENCIES - $30,000) 16 (12) HUBLEY TOWNSHIP, T-446, COUNTY BRIDGE 17 NO.71 OVER DEEP CREEK, BRIDGE 18 REPLACEMENT 400,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $330,000) 21 (LAND ALLOCATION - $20,000) 22 (DESIGN AND CONTINGENCIES - $50,000) 23 (13) GIRARDVILLE BOROUGH, JOHN STREET 24 BRIDGE OVER MAHANOY CREEK, BRIDGE 25 REPLACEMENT 245,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $200,000) 28 (LAND ALLOCATION - $10,000) 29 (DESIGN AND CONTINGENCIES - $35,000) 30 (14) ST. CLAIR BOROUGH, SHERMAN STREET 19910H1959B3288 - 179 -
1 COUNTY BRIDGE NO.48 OVER MILL CREEK, 2 BRIDGE REPLACEMENT 300,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $240,000) 5 (LAND ALLOCATION - $20,000) 6 (DESIGN AND CONTINGENCIES - $40,000) 7 (15) PINE GROVE BOROUGH, MILL STREET 8 COUNTY BRIDGE NO.33 OVER SWATARA CREEK, 9 BRIDGE REPLACEMENT 725,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $630,000) 12 (LAND ALLOCATION - $20,000) 13 (DESIGN AND CONTINGENCIES - $75,000) 14 (16) ST. CLAIR BOROUGH, RUSSELL STREET 15 BRIDGE OVER MILL CREEK, BRIDGE 16 REPLACEMENT 260,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $200,000) 19 (LAND ALLOCATION - $20,000) 20 (DESIGN AND CONTINGENCIES - $40,000) 21 (17) GILBERTON BOROUGH, RAILROAD STREET 22 BRIDGE OVER MAHANOY CREEK, BRIDGE 23 REPLACEMENT 190,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $150,000) 26 (LAND ALLOCATION - $10,000) 27 (DESIGN AND CONTINGENCIES - $30,000) 28 (18) GILBERTON BOROUGH, BRIDGE STREET 29 COUNTY BRIDGE NO.78 OVER MAHANOY CREEK, 30 BRIDGE REPLACEMENT 245,000 19910H1959B3288 - 180 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $200,000) 3 (LAND ALLOCATION - $10,000) 4 (DESIGN AND CONTINGENCIES - $35,000) 5 (19) LANDINGVILLE BOROUGH, CANAL STREET 6 BRIDGE OVER SCHUYLKILL RIVER, BRIDGE 7 REPLACEMENT 740,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $640,000) 10 (LAND ALLOCATION - $20,000) 11 (DESIGN AND CONTINGENCIES - $80,000) 12 (20) BLYTHE TOWNSHIP, T-770, RIDGE STREET 13 BRIDGE OVER SCHUYLKILL RIVER, BRIDGE 14 REPLACEMENT 450,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $380,000) 17 (LAND ALLOCATION - $20,000) 18 (DESIGN AND CONTINGENCIES - $50,000) 19 (21) NORTH MANHEIM TOWNSHIP, T-686, 20 MEMORIAL DRIVE UNDER ABANDONED RAILROAD 21 LINE, BRIDGE REMOVAL 295,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $250,000) 24 (LAND ALLOCATION - $20,000) 25 (DESIGN AND CONTINGENCIES - $25,000) 26 (22) FRACKVILLE BOROUGH, SPRING STREET 27 OVERPASS, UNDER READING RAILROAD, 28 BRIDGE REMOVAL 72,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $52,000) 19910H1959B3288 - 181 -
1 (LAND ALLOCATION - $10,000) 2 (DESIGN AND CONTINGENCIES - $10,000) 3 (23) HEGINS TOWNSHIP, T-478, BRIDGE OVER 4 PINE CREEK, BRIDGE REPLACEMENT 148,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $129,000) 7 (LAND ALLOCATION - $6,000) 8 (DESIGN AND CONTINGENCIES - $13,000) 9 (B) STATE BRIDGES 10 (1) S.R.0309 CENTER STREET OVER LITTLE 11 SCHUYLKILL RIVER, TAMAQUA BOROUGH, 12 BRIDGE REPLACEMENT 1,253,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $963,000) 15 (LAND ALLOCATION - $193,000) 16 (DESIGN AND CONTINGENCIES - $97,000) 17 (2) S.R.0061 OVER SCHUYLKILL RIVER, CITY 18 OF POTTSVILLE, BRIDGE REPLACEMENT 329,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $299,000) 21 (DESIGN AND CONTINGENCIES - $30,000) 22 (3) S.R.0061 OVER RAILROAD NEAR CITY OF 23 POTTSVILLE, BRIDGE REPLACEMENT 1,323,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $1,202,000) 26 (DESIGN AND CONTINGENCIES - $121,000) 27 (4) S.R.0895 OVER BEAR CREEK, WAYNE 28 TOWNSHIP, BRIDGE REPLACEMENT 169,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $130,000) 19910H1959B3288 - 182 -
1 (LAND ALLOCATION - $26,000) 2 (DESIGN AND CONTINGENCIES - $13,000) 3 (5) S.R.4042 OVER WEST BRANCH OF 4 SCHUYLKILL RIVER, MINERSVILLE BOROUGH, 5 BRIDGE REPLACEMENT 468,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $360,000) 8 (LAND ALLOCATION - $72,000) 9 (DESIGN AND CONTINGENCIES - $36,000) 10 (6) S.R.4002 OVER WEST BRANCH OF 11 SCHUYLKILL RIVER, CASS TOWNSHIP, BRIDGE 12 REPLACEMENT 296,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $269,000) 15 (DESIGN AND CONTINGENCIES - $27,000) 16 (7) S.R.0501 OVER BRANCH OF LITTLE SWATARA 17 CREEK, PINE GROVE TOWNSHIP, BRIDGE 18 REPLACEMENT 130,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $100,000) 21 (LAND ALLOCATION - $20,000) 22 (DESIGN AND CONTINGENCIES - $10,000) 23 (8) S.R.1002 POTTSVILLE STREET OVER MILL 24 CREEK, PORT CARBON BOROUGH, BRIDGE 25 REPLACEMENT 603,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $548,000) 28 (DESIGN AND CONTINGENCIES - $55,000) 29 (9) S.R.0209 OVER A MINE SHAFT NEAR 30 MECHANICSVILLE BOROUGH, PORT CARBON 19910H1959B3288 - 183 -
1 BOROUGH, BRIDGE REPLACEMENT 48,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $40,000) 4 (DESIGN AND CONTINGENCIES - $8,000) 5 (10) S.R.0924 OVERPASS UNDER READING 6 RAILROAD, FRACKVILLE BOROUGH, BRIDGE 7 REMOVAL 120,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $100,000) 10 (LAND ALLOCATION - $10,000) 11 (DESIGN AND CONTINGENCIES - $10,000) 12 (11) S.R.2006 OVER MAHANNON CREEK, WEST 13 BRUNSWICK TOWNSHIP, BRIDGE REMOVAL 107,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $92,000) 16 (LAND ALLOCATION - $5,000) 17 (DESIGN AND CONTINGENCIES - $10,000) 18 SECTION 59. SNYDER COUNTY. 19 (A) LOCAL BRIDGES (RESERVED) 20 (B) STATE BRIDGES 21 (1) S.R.1017 BRIDGE OVER ROLLING GREEN 22 RUN, MONROE TOWNSHIP, BRIDGE 23 REPLACEMENT 395,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $316,000) 26 (LAND ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $59,000) 28 SECTION 60. SOMERSET COUNTY. 29 (A) LOCAL BRIDGES 30 (1) ELK LICK TOWNSHIP, MOSER BRIDGE, 19910H1959B3288 - 184 -
1 BRIDGE REPLACEMENT 759,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $694,000) 4 (LAND ALLOCATION - $5,000) 5 (DESIGN AND CONTINGENCIES - $60,000) 6 (2) ALLEGHENY TOWNSHIP, BRUSH CREEK 7 BRIDGE, BRIDGE REPLACEMENT 306,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $268,000) 10 (LAND ALLOCATION - $5,000) 11 (DESIGN AND CONTINGENCIES - $33,000) 12 (3) ELK LICK TOWNSHIP, MAUST BRIDGE, 13 BRIDGE REPLACEMENT 866,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $794,000) 16 (LAND ALLOCATION - $5,000) 17 (DESIGN AND CONTINGENCIES - $67,000) 18 (4) FAIRHOPE TOWNSHIP, PACK SADDLE BRIDGE, 19 BRIDGE REPLACEMENT 228,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $200,000) 22 (LAND ALLOCATION - $5,000) 23 (DESIGN AND CONTINGENCIES - $23,000) 24 (5) SOUTHAMPTON TOWNSHIP, EMERICK BRIDGE, 25 BRIDGE REPLACEMENT 265,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $230,000) 28 (LAND ALLOCATION - $5,000) 29 (DESIGN AND CONTINGENCIES - $30,000) 30 (6) STONYCREEK TOWNSHIP, BRADY BRIDGE, 19910H1959B3288 - 185 -
1 BRIDGE REPLACEMENT 601,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $546,000) 4 (LAND ALLOCATION - $5,000) 5 (DESIGN AND CONTINGENCIES - $50,000) 6 (7) NORTHAMPTON TOWNSHIP, PHILSON BRIDGE, 7 BRIDGE REPLACEMENT 367,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $325,000) 10 (LAND ALLOCATION - $5,000) 11 (DESIGN AND CONTINGENCIES - $37,000) 12 (8) SOMERSET TOWNSHIP, HOUSEFELDT BRIDGE, 13 BRIDGE REPLACEMENT 366,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $325,000) 16 (LAND ALLOCATION - $5,000) 17 (DESIGN AND CONTINGENCIES - $36,000) 18 (B) STATE BRIDGES 19 (1) S.R.0219, MILLER RUN BRIDGE NO.2, 20 BROTHERS VALLEY TOWNSHIP, BRIDGE 21 REPLACEMENT 560,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $465,000) 24 (LAND ALLOCATION - $25,000) 25 (DESIGN AND CONTINGENCIES - $70,000) 26 (2) S.R.2005, INTERSECTION BRIDGE OVER ELK 27 LICK CREEK, SOMERSET TOWNSHIP, BRIDGE 28 REPLACEMENT 558,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $442,000) 19910H1959B3288 - 186 -
1 (LAND ALLOCATION - $50,000) 2 (DESIGN AND CONTINGENCIES - $66,000) 3 (3) S.R.1004, EAST SHANKSVILLE BRIDGE OVER 4 RHOADES CREEK, SHANKSVILLE BOROUGH, 5 BRIDGE REPLACEMENT 992,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $789,000) 8 (LAND ALLOCATION - $100,000) 9 (DESIGN AND CONTINGENCIES - $103,000) 10 (4) S.R.0281, SOUTHWEST SOMERSET BRIDGE 11 OVER WEST BRANCH COXES CREEK, SOMERSET 12 TOWNSHIP, BRIDGE REPLACEMENT 678,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $556,000) 15 (LAND ALLOCATION - $50,000) 16 (DESIGN AND CONTINGENCIES - $72,000) 17 (5) S.R.0031, EAST BROTHERTON BRIDGE OVER 18 SANDY HALLOW CREEK, STONEYCREEK 19 TOWNSHIP, BRIDGE REPLACEMENT 535,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $445,000) 22 (LAND ALLOCATION - $25,000) 23 (DESIGN AND CONTINGENCIES - $65,000) 24 (6) S.R.0219, MILLER RUN BRIDGE NO.1, 25 BROTHERS VALLEY TOWNSHIP, BRIDGE 26 REPLACEMENT 560,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $465,000) 29 (LAND ALLOCATION - $25,000) 30 (DESIGN AND CONTINGENCIES - $70,000) 19910H1959B3288 - 187 -
1 (7) S.R.0031, KIMBERLY RUN BRIDGE, 2 SOMERSET TOWNSHIP, BRIDGE REPLACEMENT 525,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $435,000) 5 (LAND ALLOCATION - $25,000) 6 (DESIGN AND CONTINGENCIES - $65,000) 7 (8) S.R.2021, BURKHART BRIDGE OVER 8 SHAFFERS RUN, FAIRHOPE TOWNSHIP, BRIDGE 9 REPLACEMENT 675,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $553,000) 12 (LAND ALLOCATION - $50,000) 13 (DESIGN AND CONTINGENCIES - $72,000) 14 (9) S.R.2021, MIDWAY BRIDGE OVER SHAFFERS 15 RUN, FAIRHOPE TOWNSHIP, BRIDGE 16 REPLACEMENT 560,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $444,000) 19 (LAND ALLOCATION - $50,000) 20 (DESIGN AND CONTINGENCIES - $66,000) 21 (10) S.R.4041, KRINGS BRIDGE OVER 22 STONYCREEK RIVER, CONEMAUGH TOWNSHIP, 23 BRIDGE REPLACEMENT 2,496,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $2,087,000) 26 (LAND ALLOCATION - $200,000) 27 (DESIGN AND CONTINGENCIES - $209,000) 28 SECTION 61. SULLIVAN COUNTY (RESERVED). 29 SECTION 62. SUSQUEHANNA COUNTY. 30 (A) LOCAL BRIDGES (RESERVED) 19910H1959B3288 - 188 -
1 (B) STATE BRIDGES 2 (1) S.R.0374 OVER TUNKHANNOCK CREEK, 3 CLIFFORD TOWNSHIP, BRIDGE REPLACEMENT 350,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $300,000) 6 (LAND ALLOCATION - $10,000) 7 (DESIGN AND CONTINGENCIES - $40,000) 8 (2) S.R.2021 OVER TUNKHANNOCK CREEK, 9 LENOXVILLE BOROUGH, BRIDGE REPLACEMENT 800,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $700,000) 12 (LAND ALLOCATION - $10,000) 13 (DESIGN AND CONTINGENCIES - $90,000) 14 (3) S.R.2021 OVER TUNKHANNOCK CREEK, LENOX 15 TOWNSHIP, BRIDGE REPLACEMENT 1,470,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $1,300,000) 18 (LAND ALLOCATION - $10,000) 19 (DESIGN AND CONTINGENCIES - $160,000) 20 (4) S.R.0267 OVER EAST BRANCH OF WYALUSING 21 CREEK, RUSH TOWNSHIP, BRIDGE 22 REPLACEMENT 1,250,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $1,107,000) 25 (LAND ALLOCATION - $10,000) 26 (DESIGN AND CONTINGENCIES - $133,000) 27 (5) S.R.0106 OVER EAST BRANCH OF 28 TUNKHANNOCK CREEK, CLIFFORD TOWNSHIP, 29 BRIDGE REPLACEMENT 1,018,000 30 (BASE CONSTRUCTION ALLOCATION - 19910H1959B3288 - 189 -
1 $900,000) 2 (LAND ALLOCATION - $10,000) 3 (DESIGN AND CONTINGENCIES - $108,000) 4 (6) S.R.0171 OVER EAST BRANCH OF 5 LACKAWANNA RIVER, CLIFFORD TOWNSHIP, 6 BRIDGE REPLACEMENT 2,938,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $2,605,000) 9 (LAND ALLOCATION - $20,000) 10 (DESIGN AND CONTINGENCIES - $313,000) 11 (7) S.R.0106 OVER EAST BRANCH OF 12 TUNKHANNOCK CREEK, CLIFFORD TOWNSHIP, 13 BRIDGE REPLACEMENT 1,870,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $1,660,000) 16 (LAND ALLOCATION - $10,000) 17 (DESIGN AND CONTINGENCIES - $200,000) 18 (8) S.R.0374 OVER TUNKHANNOCK CREEK, LENOX 19 TOWNSHIP, BRIDGE REPLACEMENT 370,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $320,000) 22 (LAND ALLOCATION - $10,000) 23 (DESIGN AND CONTINGENCIES - $40,000) 24 (9) S.R.3029 OVER EAST BRANCH OF WYALUSING 25 CREEK, JESSUP TOWNSHIP, BRIDGE 26 REPLACEMENT 794,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $700,000) 29 (LAND ALLOCATION - $10,000) 30 (DESIGN AND CONTINGENCIES - $84,000) 19910H1959B3288 - 190 -
1 (10) S.R.1010 OVER LEWIS CREEK, OAKLAND 2 TOWNSHIP, BRIDGE REPLACEMENT 486,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $425,000) 5 (LAND ALLOCATION - $10,000) 6 (DESIGN AND CONTINGENCIES - $51,000) 7 (11) S.R.0858 OVER APOLACON CREEK, LITTLE 8 MEADOWS BOROUGH, BRIDGE REPLACEMENT 1,197,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $1,060,000) 11 (LAND ALLOCATION - $10,000) 12 (DESIGN AND CONTINGENCIES - $127,000) 13 (12) S.R.0848 OVER BRANCH OF BUTLER CREEK, 14 GIBSON TOWNSHIP, BRIDGE REPLACEMENT 532,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $466,000) 17 (LAND ALLOCATION - $10,000) 18 (DESIGN AND CONTINGENCIES - $56,000) 19 (13) S.R.2050 OVER NORTH BRANCH OF 20 TUNKHANNOCK CREEK, CLIFFORD TOWNSHIP, 21 BRIDGE REPLACEMENT 553,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $485,000) 24 (LAND ALLOCATION - $10,000) 25 (DESIGN AND CONTINGENCIES - $58,000) 26 (14) S.R.2061 OVER MEYLERT CREEK, NEW 27 MILFORD TOWNSHIP, BRIDGE REPLACEMENT 380,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $330,000) 30 (LAND ALLOCATION - $10,000) 19910H1959B3288 - 191 -
1 (DESIGN AND CONTINGENCIES - $40,000) 2 (15) S.R.3012 OVER WEST BRANCH OF 3 MESHOPPEN CREEK, SPRINGVILLE TOWNSHIP, 4 BRIDGE REPLACEMENT 676,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $595,000) 7 (LAND ALLOCATION - $10,000) 8 (DESIGN AND CONTINGENCIES - $71,000) 9 (16) S.R.2096 OVER HORTON CREEK, LATHROP 10 TOWNSHIP, BRIDGE REPLACEMENT 458,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $400,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $48,000) 15 (17) S.R.0267 OVER BRANCH OF CHOCONUT 16 CREEK, CHOCONUT TOWNSHIP, BRIDGE 17 REPLACEMENT 794,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $700,000) 20 (LAND ALLOCATION - $10,000) 21 (DESIGN AND CONTINGENCIES - $84,000) 22 SECTION 63. TIOGA COUNTY (RESERVED). 23 SECTION 64. UNION COUNTY. 24 (A) LOCAL BRIDGES 25 (1) WEST BUFFALO TOWNSHIP, T-380, SCHOOL 26 HOUSE BRIDGE OVER BUFFALO CREEK, BRIDGE 27 REPLACEMENT 779,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $623,000) 30 (LAND ALLOCATION - $39,000) 19910H1959B3288 - 192 -
1 (DESIGN AND CONTINGENCIES - $117,000) 2 2) KELLY TOWNSHIP, T-450, COUNTY BRIDGE 3 NO.8, NOGLE BRIDGE OVER BUFFALO CREEK, 4 BRIDGE REPLACEMENT 1,026,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $821,000) 7 (LAND ALLOCATION - $51,000) 8 (DESIGN AND CONTINGENCIES - $154,000) 9 (3) MIFFLINBURG BOROUGH, COUNTY BRIDGE 10 NO.14, IDDINGS BRIDGE OVER BUFFALO 11 CREEK, BRIDGE REPLACEMENT 493,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $394,000) 14 (LAND ALLOCATION - $25,000) 15 (DESIGN AND CONTINGENCIES - $74,000) 16 (4) HARTLEY TOWNSHIP, TRAILS END BRIDGE 17 OVER PENNS CREEK, BRIDGE REPLACEMENT 1,120,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $896,000) 20 (LAND ALLOCATION - $56,000) 21 (DESIGN AND CONTINGENCIES - $168,000) 22 (5) WHITE DEER TOWNSHIP, BOWERSOX BRIDGE 23 OVER SPRUCE RUN, BRIDGE REPLACEMENT 300,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $240,000) 26 (LAND ALLOCATION - $15,000) 27 (DESIGN AND CONTINGENCIES - $45,000) 28 (6) LIMESTONE TOWNSHIP, DEER BRIDGE OVER 29 SWEITZER RUN, BRIDGE REPLACEMENT 350,000 30 (BASE CONSTRUCTION ALLOCATION - 19910H1959B3288 - 193 -
1 $280,000) 2 (LAND ALLOCATION - $15,000) 3 (DESIGN AND CONTINGENCIES - $55,000) 4 (B) STATE BRIDGES (RESERVED) 5 SECTION 65. VENANGO COUNTY. 6 (A) LOCAL BRIDGES 7 (1) CHERRY TREE TOWNSHIP, T-520 OVER 8 PRATHER CREEK, BRIDGE REPLACEMENT 120,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $96,000) 11 (LAND ALLOCATION - $12,000) 12 (DESIGN AND CONTINGENCIES - $12,000) 13 (2) OIL CREEK TOWNSHIP, T-639 ON COE ROAD 14 OVER PITHOLE CREEK, BRIDGE REPLACEMENT 112,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $90,000) 17 (LAND ALLOCATION - $11,000) 18 (DESIGN AND CONTINGENCIES - $11,000) 19 (3) OAKLAND TOWNSHIP, T-450 OVER TWO MULE 20 RUN TRIBUTARY, BRIDGE REPLACEMENT 154,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $124,000) 23 (LAND ALLOCATION - $15,000) 24 (DESIGN AND CONTINGENCIES - $15,000) 25 (4) CHERRY TREE TOWNSHIP, T-649 OVER 26 PRATHER CREEK, BRIDGE REPLACEMENT 120,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $96,000) 29 (LAND ALLOCATION - $12,000) 30 (DESIGN AND CONTINGENCIES - $12,000) 19910H1959B3288 - 194 -
1 (5) ROCKLAND TOWNSHIP, T-512, SLAB FURNACE 2 RAILROAD OVER CONRAIL RAILROAD, BRIDGE 3 REPLACEMENT 442,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $384,000) 6 (LAND ALLOCATION - $10,000) 7 (DESIGN AND CONTINGENCIES - $48,000) 8 (6) ROCKLAND TOWNSHIP, T-582, CONRAIL 9 BRIDGE T-582 OVER CONRAIL RAILROAD, 10 BRIDGE REPLACEMENT 385,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $345,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $30,000) 15 (B) STATE BRIDGES 16 (1) S.R.3007, WITHERUP BRIDGE OVER 17 SCRUBGRASS CREEK, CLINTON TOWNSHIP, 18 BRIDGE REPLACEMENT 850,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $665,000) 21 (LAND ALLOCATION - $60,000) 22 (DESIGN AND CONTINGENCIES - $125,000) 23 (2) S.R.0036 ON COL. DRAKE HIGHWAY OVER 24 PITHOLE CREEK, ALLEGHENY TOWNSHIP, 25 BRIDGE REPLACEMENT 900,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $765,000) 28 (LAND ALLOCATION - $45,000) 29 (DESIGN AND CONTINGENCIES - $90,000) 30 SECTION 66. WARREN COUNTY. 19910H1959B3288 - 195 -
1 (A) LOCAL BRIDGES 2 (1) PITTSFIELD TOWNSHIP, T-435 OVER 3 ANDREWS RUN, BRIDGE REPLACEMENT 192,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $154,000) 6 (LAND ALLOCATION - $19,000) 7 (DESIGN AND CONTINGENCIES - $19,000) 8 (2) FREEHOLD TOWNSHIP, T-549 OVER STONEY 9 CREEK, BRIDGE REPLACEMENT 110,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $88,000) 12 (LAND ALLOCATION - $11,000) 13 (DESIGN AND CONTINGENCIES - $11,000) 14 (3) SHEFFIELD TOWNSHIP, T-540 OVER TWO 15 MILE RUN, BRIDGE REPLACEMENT 318,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $254,000) 18 (LAND ALLOCATION - $32,000) 19 (DESIGN AND CONTINGENCIES - $32,000) 20 (4) SOUTHWEST TOWNSHIP, T-306 ON MT. HOPE 21 ROAD OVER PINE CREEK, BRIDGE 22 REPLACEMENT 207,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $165,000) 25 (LAND ALLOCATION - $21,000) 26 (DESIGN AND CONTINGENCIES - $21,000) 27 (5) SPRING CREEK TOWNSHIP, T-322 OVER EAST 28 BRANCH OF SPRING CREEK, BRIDGE 29 REPLACEMENT 207,000 30 (BASE CONSTRUCTION ALLOCATION - 19910H1959B3288 - 196 -
1 $165,000) 2 (LAND ALLOCATION - $21,000) 3 (DESIGN AND CONTINGENCIES - $21,000) 4 (6) SOUTHWEST TOWNSHIP, T-313 ON SWEDE 5 ROAD OVER PINE CREEK, BRIDGE 6 REPLACEMENT 109,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $87,000) 9 (LAND ALLOCATION - $11,000) 10 (DESIGN AND CONTINGENCIES - $11,000) 11 (7) SHEFFIELD TOWNSHIP, T-311 OVER 12 CALDWELL CREEK, BRIDGE REPLACEMENT 210,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $168,000) 15 (LAND ALLOCATION - $21,000) 16 (DESIGN AND CONTINGENCIES - $21,000) 17 (8) SOUTHWEST TOWNSHIP, T-309 OVER PINE 18 CREEK, BRIDGE REPLACEMENT 124,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $100,000) 21 (LAND ALLOCATION - $12,000) 22 (DESIGN AND CONTINGENCIES - $12,000) 23 (9) SPRING CREEK TOWNSHIP, T-395 OVER 24 HOSMER RUN, BRIDGE REPLACEMENT 207,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $165,000) 27 (LAND ALLOCATION - $21,000) 28 (DESIGN AND CONTINGENCIES - $21,000) 29 (10) COLUMBUS TOWNSHIP, T-340 ON LACY ROAD 30 OVER HARE CREEK, BRIDGE REPLACEMENT 166,000 19910H1959B3288 - 197 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $132,000) 3 (LAND ALLOCATION - $17,000) 4 (DESIGN AND CONTINGENCIES - $17,000) 5 (11) COLUMBUS TOWNSHIP, T-350 ON 6 ALTERBOTTOM OVER TAMAROCK SWAMP 7 TRIBUTARY, BRIDGE REPLACEMENT 84,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $68,000) 10 (LAND ALLOCATION - $8,000) 11 (DESIGN AND CONTINGENCIES - $8,000) 12 (12) SPRING CREEK TOWNSHIP, T-425 OVER 13 SPRING CREEK, BRIDGE REPLACEMENT 161,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $129,000) 16 (LAND ALLOCATION - $16,000) 17 (DESIGN AND CONTINGENCIES - $16,000) 18 (13) BROKENSTRAW TOWNSHIP, T-444 ON IRVINE 19 RUN ROAD OVER IRVINE RUN, BRIDGE 20 REPLACEMENT 110,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $88,000) 23 (LAND ALLOCATION - $11,000) 24 (DESIGN AND CONTINGENCIES - $11,000) 25 (14) ELDRED TOWNSHIP, T-355 ON GLOSSVILLE 26 ROAD OVER CALDWELL CREEK, BRIDGE 27 REPLACEMENT 119,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $95,000) 30 (LAND ALLOCATION - $12,000) 19910H1959B3288 - 198 -
1 (DESIGN AND CONTINGENCIES - $12,000) 2 (15) ELDRED TOWNSHIP, T-355 ON EUREKA ROAD 3 OVER CALDWELL CREEK, BRIDGE 4 REPLACEMENT 151,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $121,000) 7 (LAND ALLOCATION - $15,000) 8 (DESIGN AND CONTINGENCIES - $15,000) 9 (16) COLUMBIA TOWNSHIP, T-639 ON STEWART 10 ROAD OVER WINTON RUN, BRIDGE 11 REPLACEMENT 144,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $116,000) 14 (LAND ALLOCATION - $14,000) 15 (DESIGN AND CONTINGENCIES - $14,000) 16 (17) FREEHOLD TOWNSHIP, T-406 ON HUNTLEY 17 ROAD OVER MILL CREEK, BRIDGE 18 REPLACEMENT 157,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $125,000) 21 (LAND ALLOCATION - $16,000) 22 (DESIGN AND CONTINGENCIES - $16,000) 23 (18) SUGAR GROVE TOWNSHIP, T-539 OVER 24 STEELWATER CREEK, BRIDGE REPLACEMENT 122,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $98,000) 27 (LAND ALLOCATION - $12,000) 28 (DESIGN AND CONTINGENCIES - $12,000) 29 (19) SUGAR GROVE TOWNSHIP, T-587 ON CREEK 30 ROAD OVER SONDERS RUN, BRIDGE 19910H1959B3288 - 199 -
1 REPLACEMENT 122,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $98,000) 4 (LAND ALLOCATION - $12,000) 5 (DESIGN AND CONTINGENCIES - $12,000) 6 (20) TIDIOUTE BOROUGH, FIRST STREET OVER 7 MCGUIRE RUN, BRIDGE REPLACEMENT 138,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $110,000) 10 (LAND ALLOCATION - $14,000) 11 (DESIGN AND CONTINGENCIES - $14,000) 12 (21) TIDIOUTE BOROUGH, GRANT STREET OVER 13 TIDIOUTE CREEK, BRIDGE REPLACEMENT 130,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $104,000) 16 (LAND ALLOCATION - $13,000) 17 (DESIGN AND CONTINGENCIES - $13,000) 18 (22) SUGAR GROVE TOWNSHIP, T-452 ON DEER 19 RUN ROAD OVER PATCHEN RUN, BRIDGE 20 REPLACEMENT 140,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $112,000) 23 (LAND ALLOCATION - $14,000) 24 (DESIGN AND CONTINGENCIES - $14,000) 25 (B) STATE BRIDGES 26 (1) S.R.0957 OVER STILLWATER CREEK, SUGAR 27 GROVE TOWNSHIP, BRIDGE REPLACEMENT 350,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $300,000) 30 (LAND ALLOCATION - $20,000) 19910H1959B3288 - 200 -
1 (DESIGN AND CONTINGENCIES - $30,000) 2 (2) S.R.3005 ON HICKORY STREET OVER 3 ALLEGHENY RUN, WARREN BOROUGH, BRIDGE 4 REHABILITATION 2,000,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $1,850,000) 7 (LAND ALLOCATION - $50,000) 8 (DESIGN AND CONTINGENCIES - $100,000) 9 (3) S.R.3010 OVER WHITNEY RUN, SPRING 10 CREEK TOWNSHIP, BRIDGE REPLACEMENT 440,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $390,000) 13 (LAND ALLOCATION - $20,000) 14 (DESIGN AND CONTINGENCIES - $30,000) 15 (4) S.R.0127 OVER GORDON RUN, TRIUMPH 16 TOWNSHIP, BRIDGE REPLACEMENT 300,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $250,000) 19 (LAND ALLOCATION - $20,000) 20 (DESIGN AND CONTINGENCIES - $30,000) 21 (5) S.R.0027 OVER HOSMER CREEK, PITTSFIELD 22 TOWNSHIP, BRIDGE REPLACEMENT 560,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $480,000) 25 (LAND ALLOCATION - $30,000) 26 (DESIGN AND CONTINGENCIES - $50,000) 27 (6) S.R.3010 OVER BROKENSTRAW CREEK, 28 SPRING CREEK TOWNSHIP, BRIDGE 29 REPLACEMENT 1,450,000 30 (BASE CONSTRUCTION ALLOCATION - 19910H1959B3288 - 201 -
1 $1,200,000) 2 (LAND ALLOCATION - $50,000) 3 (DESIGN AND CONTINGENCIES - $200,000) 4 (7) S.R.3014 ON COLE HILL ROAD OVER 5 BROKENSTRAW CREEK, PITTSFIELD TOWNSHIP, 6 BRIDGE REPLACEMENT 600,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $520,000) 9 (LAND ALLOCATION - $10,000) 10 (DESIGN AND CONTINGENCIES - $70,000) 11 (8) S.R.3022 OVER IRVINE RUN, BROKENSTRAW 12 TOWNSHIP, BRIDGE REPLACEMENT 630,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $500,000) 15 (LAND ALLOCATION - $30,000) 16 (DESIGN AND CONTINGENCIES - $100,000) 17 (9) S.R.0059, T.R.59, DEVILS ELBOW BRIDGE 18 OVER JAKES RUN, MEAD TOWNSHIP, BRIDGE 19 REHABILITATION 2,000,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $1,830,000) 22 (LAND ALLOCATION - $20,000) 23 (DESIGN AND CONTINGENCIES - $150,000) 24 (10) S.R.0069 ON JACKSON ROAD OVER JACKSON 25 RUN, CONEWANGO TOWNSHIP, BRIDGE 26 REPLACEMENT 330,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $281,000) 29 (LAND ALLOCATION - $17,000) 30 (DESIGN AND CONTINGENCIES - $32,000) 19910H1959B3288 - 202 -
1 (11) S.R.0069 ON JACKSON ROAD OVER JACKSON 2 RUN, CONEWANGO TOWNSHIP, BRIDGE 3 REPLACEMENT 320,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $272,000) 6 (LAND ALLOCATION - $16,000) 7 (DESIGN AND CONTINGENCIES - $32,000) 8 (12) S.R.0958 OVER LITTLE BROKENSTRAW 9 CREEK, FREEHOLD TOWNSHIP, BRIDGE 10 REPLACEMENT 240,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $204,000) 13 (LAND ALLOCATION - $12,000) 14 (DESIGN AND CONTINGENCIES - $24,000) 15 (13) S.R.2010 BROWN RUN ROAD OVER BROWNS 16 RUN, MEAD TOWNSHIP, BRIDGE REPLACEMENT 320,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $272,000) 19 (LAND ALLOCATION - $16,000) 20 (DESIGN AND CONTINGENCIES - $32,000) 21 (14) S.R.0006 IN VILLAGE OF SAYBROOK OVER 22 FOUR MILE RUN, SHEFFIELD TOWNSHIP, 23 BRIDGE REPLACEMENT 451,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $383,000) 26 (LAND ALLOCATION - $23,000) 27 (DESIGN AND CONTINGENCIES - $45,000) 28 SECTION 67. WASHINGTON COUNTY. 29 (A) LOCAL BRIDGES 30 (1) CECIL TOWNSHIP, SEGMENT 0130 OFFSET 19910H1959B3288 - 203 -
1 2811, BRIDGE REPLACEMENT 250,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $250,000) 4 (2) CECIL TOWNSHIP, SEGMENT 0080 OFFSET 5 1384, BRIDGE REPLACEMENT 60,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $60,000) 8 (3) CROSS CREEK TOWNSHIP, SEGMENT 0020 9 OFFSET 0027, BRIDGE REPLACEMENT 500,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $500,000) 12 (4) CANONSBURG BOROUGH, SOUTH CENTRAL 13 AVENUE OVER BRANCH OF CHARTIERS CREEK, 14 BRIDGE REPLACEMENT 1,000,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $1,000,000) 17 (5) DONEGAL TOWNSHIP, SEGMENT 0080 OFFSET 18 0039, BRIDGE REPLACEMENT 325,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $325,000) 21 (6) CROSS CREEK TOWNSHIP, T-433, PARKER 22 ROAD BRIDGE OVER MIDDLE FORK CREEK, 23 BRIDGE REPLACEMENT 73,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $67,000) 26 (DESIGN AND CONTINGENCIES - $6,000) 27 (B) STATE BRIDGES 28 (1) S.R.0040, LANE-BANE BRIDGE OVER 29 MONONGAHELA RIVER, WEST BROWNSVILLE 30 BOROUGH, BRIDGE REHABILITATION 6,805,000 19910H1959B3288 - 204 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $6,000,000) 3 (LAND ALLOCATION - $5,000) 4 (DESIGN AND CONTINGENCIES - $800,000) 5 (2) S.R.0136, BEAU STREET BRIDGE OVER I- 6 70, EAST WASHINGTON BOROUGH, BRIDGE 7 REHABILITATION 1,266,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $1,142,000) 10 (LAND ALLOCATION - $10,000) 11 (DESIGN AND CONTINGENCIES - $114,000) 12 (3) S.R.0231, TEMPLETON BRIDGE OVER BRANCH 13 OF TEMPLETON'S FORK, EAST FINLEY 14 TOWNSHIP, BRIDGE REPLACEMENT 250,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $200,000) 17 (LAND ALLOCATION - $20,000) 18 (DESIGN AND CONTINGENCIES - $30,000) 19 (4) S.R.0917, SAW MILL RUN BRIDGE OVER 20 BRANCH OF SAW MILL RUN, FALLOWFIELD 21 TOWNSHIP, BRIDGE REPLACEMENT 275,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $225,000) 24 (LAND ALLOCATION - $20,000) 25 (DESIGN AND CONTINGENCIES - $30,000) 26 (5) S.R.0980, CANONSBURG BRIDGE NO.1 OVER 27 CHARTIERS CREEK, CANONSBURG BOROUGH, 28 BRIDGE REPLACEMENT 1,010,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $885,000) 19910H1959B3288 - 205 -
1 (LAND ALLOCATION - $40,000) 2 (DESIGN AND CONTINGENCIES - $85,000) 3 (6) S.R.0980, CANONSBURG BRIDGE NO.2 OVER 4 BRIDGE OF CHARTIERS CREEK, CANONSBURG 5 BOROUGH, BRIDGE REPLACEMENT 590,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $500,000) 8 (LAND ALLOCATION - $40,000) 9 (DESIGN AND CONTINGENCIES - $50,000) 10 (7) S.R.1087, CROOKHAM BRIDGE OVER MINGO 11 CREEK, CARROLL TOWNSHIP, BRIDGE 12 REPLACEMENT 190,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $159,000) 15 (LAND ALLOCATION - $15,000) 16 (DESIGN AND CONTINGENCIES - $16,000) 17 (8) S.R.2037, WESTSIDE BRIDGE OVER 18 WESTSIDE CREEK, FALLOWFIELD TOWNSHIP, 19 BRIDGE REPLACEMENT 84,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $66,000) 22 (LAND ALLOCATION - $11,000) 23 (DESIGN AND CONTINGENCIES - $7,000) 24 (9) S.R.4004, RACCOON CREEK BRIDGE OVER 25 RACCOON CREEK, HANOVER AND SMITH 26 TOWNSHIPS, BRIDGE REPLACEMENT 750,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $650,000) 29 (LAND ALLOCATION - $20,000) 30 (DESIGN AND CONTINGENCIES - $80,000) 19910H1959B3288 - 206 -
1 (10) S.R.4037, ROBINSON RUN BRIDGE OVER 2 BRANCH OF ROBINSON RUN, ROBINSON 3 TOWNSHIP, BRIDGE REPLACEMENT 400,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $345,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $35,000) 8 (11) S.R.1002, SEGMENT 0100 OFFSET 1284, 9 PETERS TOWNSHIP, BRIDGE REPLACEMENT 750,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $750,000) 12 (12) S.R.2041 OVER BRANCH OF PIKE RUN, 13 WEST PIKE RUN TOWNSHIP, BRIDGE 14 REPLACEMENT 500,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $500,000) 17 (13) S.R.4018, CROSS CREEK BRIDGE EAST OF 18 AVELLA, BRIDGE REPLACEMENT 350,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $350,000) 21 (14) S.R.3023 OVER LR798, DONEGAL 22 TOWNSHIP, BRIDGE REPLACEMENT 750,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $750,000) 25 (15) S.R.1010 OVER BRUSH RUN, PETERS 26 TOWNSHIP, BRIDGE REPLACEMENT 750,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $750,000) 29 (16) S.R.0519, SEGMENT 0150 OFFSET 0921, 30 NORTH STRABANE TOWNSHIP, BRIDGE 19910H1959B3288 - 207 -
1 REPLACEMENT 1,500,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $1,500,000) 4 SECTION 68. WAYNE COUNTY. 5 (A) LOCAL BRIDGES 6 (1) BUCKINGHAM TOWNSHIP, T-603, BRIDGE 7 NO.5 OVER EQUINUNK CREEK (FACTORY), 8 BRIDGE REPLACEMENT 281,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $250,000) 11 (LAND ALLOCATION - $1,000) 12 (DESIGN AND CONTINGENCIES - $30,000) 13 (2) DAMASCUS TOWNSHIP, T-508, BRIDGE NO.9 14 OVER SOUTH BRANCH OF CALKINS CREEK 15 (BOYD'S MILLS), BRIDGE REPLACEMENT 132,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $110,000) 18 (LAND ALLOCATION - $2,000) 19 (DESIGN AND CONTINGENCIES - $20,000) 20 (3) DAMASCUS TOWNSHIP, T-677, BRIDGE NO.10 21 OVER NORTH BRANCH OF CALKINS CREEK 22 (HIGH BRIDGE), BRIDGE REPLACEMENT 122,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $100,000) 25 (LAND ALLOCATION - $2,000) 26 (DESIGN AND CONTINGENCIES - $20,000) 27 (4) DAMASCUS TOWNSHIP, T-636, BRIDGE NO.11 28 OVER NORTH BRANCH OF CALKINS CREEK 29 (BISHOFF), BRIDGE REPLACEMENT 220,000 30 (BASE CONSTRUCTION ALLOCATION - 19910H1959B3288 - 208 -
1 $180,000) 2 (LAND ALLOCATION - $10,000) 3 (DESIGN AND CONTINGENCIES - $30,000) 4 (5) PRESTON TOWNSHIP, T-682, BRIDGE NO.30 5 OVER EQUINUNK CREEK (DOLANS), BRIDGE 6 REPLACEMENT 172,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $150,000) 9 (LAND ALLOCATION - $2,000) 10 (DESIGN AND CONTINGENCIES - $20,000) 11 (6) PRESTON TOWNSHIP, T-684, BRIDGE NO.31 12 OVER EQUINUNK CREEK (WILLIAMS), BRIDGE 13 REPLACEMENT 209,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $180,000) 16 (LAND ALLOCATION - $4,000) 17 (DESIGN AND CONTINGENCIES - $25,000) 18 (7) PROMPTON BOROUGH, T-444, BRIDGE NO.32 19 OVER VAN AUKEN CREEK, BRIDGE 20 REPLACEMENT 180,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $150,000) 23 (LAND ALLOCATION - $5,000) 24 (DESIGN AND CONTINGENCIES - $25,000) 25 (B) STATE BRIDGES 26 (1) S.R.1016 BRIDGE OVER HOLLISTER CREEK, 27 DAMASCUS TOWNSHIP, BRIDGE REPLACEMENT 415,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $360,000) 30 (LAND ALLOCATION - $10,000) 19910H1959B3288 - 209 -
1 (DESIGN AND CONTINGENCIES - $45,000) 2 (2) S.R.0191 OVER DYBERRY CREEK, DYBERRY 3 TOWNSHIP, BRIDGE REPLACEMENT 570,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $500,000) 6 (LAND ALLOCATION - $10,000) 7 (DESIGN AND CONTINGENCIES - $60,000) 8 (3) S.R.0006 BRIDGE OVER LACKAWAXEN RIVER, 9 HAWLEY BOROUGH, BRIDGE REPLACEMENT 2,395,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $2,120,000) 12 (LAND ALLOCATION - $20,000) 13 (DESIGN AND CONTINGENCIES - $255,000) 14 (4) S.R.4043 BRIDGE OVER BRANCH OF SHERMAN 15 CREEK, SCOTT TOWNSHIP, BRIDGE 16 REPLACEMENT 469,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $410,000) 19 (LAND ALLOCATION - $10,000) 20 (DESIGN AND CONTINGENCIES - $49,000) 21 (5) S.R.4023, BRIDGE NO.2 OVER WEST BRANCH 22 OF LACKAWAXEN RIVER, MOUNT PLEASANT 23 TOWNSHIP, BRIDGE REPLACEMENT 410,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $358,000) 26 (LAND ALLOCATION - $10,000) 27 (DESIGN AND CONTINGENCIES - $42,000) 28 (6) S.R.4037 BRIDGE OVER OQUAGA CREEK, 29 SCOTT TOWNSHIP, BRIDGE REPLACEMENT 805,000 30 (BASE CONSTRUCTION ALLOCATION - 19910H1959B3288 - 210 -
1 $710,000) 2 (LAND ALLOCATION - $10,000) 3 (DESIGN AND CONTINGENCIES - $85,000) 4 (7) S.R.1002 OVER DELAWARE RIVER, DAMASCUS 5 TOWNSHIP, BRIDGE REPLACEMENT 3,410,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $3,000,000) 8 (LAND ALLOCATION - $10,000) 9 (DESIGN AND CONTINGENCIES - $400,000) 10 (8) S.R.0191 OVER DELAWARE RIVER, 11 BUCKINGHAM TOWNSHIP, BRIDGE 12 REPLACEMENT 1,240,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $1,100,000) 15 (LAND ALLOCATION - $10,000) 16 (DESIGN AND CONTINGENCIES - $130,000) 17 (9) S.R.4023 BRIDGE OVER WEST BRANCH OF 18 LACKAWAXEN RIVER, MOUNT PLEASANT 19 TOWNSHIP, BRIDGE REPLACEMENT 410,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $358,000) 22 (LAND ALLOCATION - $10,000) 23 (DESIGN AND CONTINGENCIES - $42,000) 24 (10) S.R.4008 BRIDGE OVER JOHNSON CREEK, 25 MOUNT PLEASANT TOWNSHIP, BRIDGE 26 REPLACEMENT 395,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $344,000) 29 (LAND ALLOCATION - $10,000) 30 (DESIGN AND CONTINGENCIES - $41,000) 19910H1959B3288 - 211 -
1 (11) S.R.0296 BRIDGE OVER BRANCH OF MIDDLE 2 CREEK, 3 CANAAN TOWNSHIP, BRIDGE REPLACEMENT 420,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $365,000) 6 (LAND ALLOCATION - $10,000) 7 (DESIGN AND CONTINGENCIES - $45,000) 8 (12) S.R.0296 BRIDGE OVER BRANCH OF 9 LACKAWAXEN RIVER, CLINTON TOWNSHIP, 10 BRIDGE REPLACEMENT 585,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $515,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $60,000) 15 (13) S.R.0196 BRIDGE OVER MIDDLE CREEK, 16 LAKE TOWNSHIP, BRIDGE REPLACEMENT 1,018,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $900,000) 19 (LAND ALLOCATION - $10,000) 20 (DESIGN AND CONTINGENCIES - $108,000) 21 (14) S.R.0191 BRIDGE OVER SHEHAWKEN CREEK, 22 BUCKINGHAM TOWNSHIP, BRIDGE 23 REPLACEMENT 816,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $720,000) 26 (LAND ALLOCATION - $10,000) 27 (DESIGN AND CONTINGENCIES - $86,000) 28 (15) S.R.0191 BRIDGE OVER BRANCH OF 29 WALLENPAUPACK CREEK, DREHER TOWNSHIP, 30 BRIDGE REPLACEMENT 402,000 19910H1959B3288 - 212 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $350,000) 3 (LAND ALLOCATION - $10,000) 4 (DESIGN AND CONTINGENCIES - $42,000) 5 (16) S.R.0507 BRIDGE OVER WALLENPAUPACK 6 CREEK, DREHER TOWNSHIP, BRIDGE 7 REPLACEMENT 710,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $625,000) 10 (LAND ALLOCATION - $10,000) 11 (DESIGN AND CONTINGENCIES - $75,000) 12 (17) S.R.1023 BRIDGE OVER SOUTH BRANCH 13 EQUINUNK CREEK, MANCHESTER TOWNSHIP, 14 BRIDGE REPLACEMENT 402,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $350,000) 17 (LAND ALLOCATION - $10,000) 18 (DESIGN AND CONTINGENCIES - $42,000) 19 (18) S.R.4007 BRIDGE OVER CROOKED CREEK, 20 BUCKINGHAM TOWNSHIP, BRIDGE 21 REPLACEMENT 458,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $400,000) 24 (LAND ALLOCATION - $10,000) 25 (DESIGN AND CONTINGENCIES - $48,000) 26 (19) S.R.4007 BRIDGE OVER EQUINUNK CREEK, 27 MANCHESTER TOWNSHIP, BRIDGE 28 REPLACEMENT 660,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $580,000) 19910H1959B3288 - 213 -
1 (LAND ALLOCATION - $10,000) 2 (DESIGN AND CONTINGENCIES - $70,000) 3 (20) S.R.3046 BRIDGE OVER SPRING RUN, 4 DREHER TOWNSHIP, BRIDGE REPLACEMENT 346,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $300,000) 7 (LAND ALLOCATION - $10,000) 8 (DESIGN AND CONTINGENCIES - $36,000) 9 (21) S.R.3002 BRIDGE OVER STEVENS CREEK, 10 STERLING TOWNSHIP, BRIDGE REPLACEMENT 503,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $440,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $53,000) 15 (22) S.R.2007 BRIDGE OVER CARLEY BROOK, 16 HONESDALE BOROUGH, BRIDGE REPLACEMENT 462,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $404,000) 19 (LAND ALLOCATION - $10,000) 20 (DESIGN AND CONTINGENCIES - $48,000) 21 SECTION 69. WESTMORELAND COUNTY. 22 (A) LOCAL BRIDGES 23 (1) LATROBE BOROUGH, LOYALHANNA STREET 24 BRIDGE OVER CONRAIL AND S.R.9900, 25 BRIDGE REPLACEMENT 450,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $400,000) 28 (LAND ALLOCATION - $50,000) 29 (2) HEMPFIELD TOWNSHIP, T-471, BRIDGE ON 30 LASH ROAD, BRIDGE REPLACEMENT 518,000 19910H1959B3288 - 214 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $450,000) 3 (DESIGN AND CONTINGENCIES - $68,000) 4 (3) SEWICKLEY TOWNSHIP, T-623 OVER 5 TRIBUTARY OF LITTLE SEWICKLEY CREEK, 6 BRIDGE REPLACEMENT 130,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $100,000) 9 (LAND ALLOCATION - $10,000) 10 (DESIGN AND CONTINGENCIES - $20,000) 11 (4) HEMPFIELD TOWNSHIP, T-398, OLD ROUTE 12 NO.30, BRIDGE REPLACEMENT 530,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $400,000) 15 (LAND ALLOCATION - $40,000) 16 (DESIGN AND CONTINGENCIES - $90,000) 17 (5) HEMPFIELD TOWNSHIP, T-865, OLD AIRPORT 18 ROAD HILL BRIDGE, BRIDGE REPLACEMENT 630,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $500,000) 21 (LAND ALLOCATION - $30,000) 22 (DESIGN AND CONTINGENCIES - $100,000) 23 (6) HEMPFIELD TOWNSHIP, T-987, BROOKDALE 24 BRIDGE, BRIDGE REPLACEMENT 550,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $450,000) 27 (LAND ALLOCATION - $10,000) 28 (DESIGN AND CONTINGENCIES - $90,000) 29 (7) CITY OF GREENSBURG, LAIRD STREET 30 BRIDGE, BRIDGE REPLACEMENT 235,000 19910H1959B3288 - 215 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $200,000) 3 (LAND ALLOCATION - $5,000) 4 (DESIGN AND CONTINGENCIES - $30,000) 5 (8) MURRYSVILLE BOROUGH AND WASHINGTON 6 TOWNSHIP, LUDWIG ROAD BRIDGE NO.39, 7 BRIDGE REPLACEMENT 190,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $150,000) 10 (LAND ALLOCATION - $5,000) 11 (DESIGN AND CONTINGENCIES - $35,000) 12 (9) SEWICKLEY TOWNSHIP, T-398 BRIDGE OVER 13 LITTLE SEWICKLEY CREEK, BRIDGE 14 REPLACEMENT 703,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $630,000) 17 (LAND ALLOCATION - $10,000) 18 (DESIGN AND CONTINGENCIES - $63,000) 19 (10) MURRYSVILLE AND DELMONT BOROUGHS, OLD 20 WILLIAM PENN HIGHWAY BRIDGE E11, BRIDGE 21 REPLACEMENT 185,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $150,000) 24 (DESIGN AND CONTINGENCIES - $35,000) 25 (11) MURRYSVILLE BOROUGH, KEMERER ROAD 26 BRIDGE NO.20 OVER BRANCH OF STEELS RUN, 27 BRIDGE REPLACEMENT 95,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $75,000) 30 (DESIGN AND CONTINGENCIES - $20,000) 19910H1959B3288 - 216 -
1 (12) YOUNGWOOD BOROUGH, HILLIS STREET 2 BRIDGE NO.64, BRIDGE REPLACEMENT 265,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $233,000) 5 (LAND ALLOCATION - $10,000) 6 (DESIGN AND CONTINGENCIES - $22,000) 7 (13) YOUNGWOOD BOROUGH, DEPOT STREET 8 BRIDGE, BRIDGE REPLACEMENT 545,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $475,000) 11 (LAND ALLOCATION - $10,000) 12 (DESIGN AND CONTINGENCIES - $60,000) 13 (14) HEMPFIELD TOWNSHIP, T-398, OLD ROUTE 14 30 BRIDGE, BRIDGE REPLACEMENT 230,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $200,000) 17 (DESIGN AND CONTINGENCIES - $30,000) 18 (15) HEMPFIELD TOWNSHIP, T-470, LADYSMITH 19 ROAD BRIDGE, BRIDGE REPLACEMENT 690,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $600,000) 22 (DESIGN AND CONTINGENCIES - $90,000) 23 (16) HEMPFIELD TOWNSHIP, T-748, SWEITZER 24 ROAD BRIDGE, BRIDGE REPLACEMENT 920,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $800,000) 27 (DESIGN AND CONTINGENCIES - $120,000) 28 (17) HEMPFIELD TOWNSHIP, T-474, WHIGHAM 29 ROAD BRIDGE, BRIDGE REPLACEMENT 576,000 30 (BASE CONSTRUCTION ALLOCATION - 19910H1959B3288 - 217 -
1 $500,000) 2 (LAND ALLOCATION - $1,000) 3 (DESIGN AND CONTINGENCIES - $75,000) 4 (18) HEMPFIELD TOWNSHIP, T-655, ROCKY 5 MOUNTAIN BRIDGE, BRIDGE REPLACEMENT 518,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $450,000) 8 (DESIGN AND CONTINGENCIES - $68,000) 9 (19) HEMPFIELD TOWNSHIP, T-792, PORE ROAD 10 BRIDGE, BRIDGE REPLACEMENT 230,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $200,000) 13 (DESIGN AND CONTINGENCIES - $30,000) 14 (20) HEMPFIELD TOWNSHIP, T-865, AIRPORT 15 HILL ROAD BRIDGE, BRIDGE REPLACEMENT 575,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $500,000) 18 (DESIGN AND CONTINGENCIES - $75,000) 19 (21) HEMPFIELD TOWNSHIP, T-987, BROOKDALE 20 DRIVE BRIDGE, BRIDGE REPLACEMENT 518,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $450,000) 23 (DESIGN AND CONTINGENCIES - $68,000) 24 (22) NEW BRIDGE SPANNING ALLEGHENY RIVER 25 TO CONNECT S.R.0028 AND S.R.0366, 26 BRIDGE REPLACEMENT 131,500,000 27 (23) CITY OF NEW KENSINGTON, LOCUST STREET 28 VIADUCT, BRIDGE REPLACEMENT 1,500,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $1,500,000) 19910H1959B3288 - 218 -
1 (24) CITY OF LOWER BURRELL, EDGECLIFF ROAD 2 BRIDGE, BRIDGE REPLACEMENT 225,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $225,000) 5 (25) NORTH HUNTINGTON TOWNSHIP, BRATKOVICH 6 ROAD BRIDGE, BRIDGE REPLACEMENT 9,152,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $9,152,000) 9 (26) NORTH HUNTINGTON TOWNSHIP, LONG RUN 10 BRIDGE OVER LONG RUN, BRIDGE 11 REPLACEMENT 46,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $32,000) 14 (LAND ALLOCATION - $11,000) 15 (DESIGN AND CONTINGENCIES - $3,000) 16 (27) WALLACE AVENUE BRIDGE, BRIDGE 17 REPLACEMENT 22,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $12,000) 20 (DESIGN AND CONTINGENCIES - $10,000) 21 (28) NORTH HUNTINGTON TOWNSHIP, MCCAVETT 22 ROAD BRIDGE OVER CONRAIL, BRIDGE 23 REPLACEMENT 1,115,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $1,015,000) 26 (LAND ALLOCATION - $10,000) 27 (DESIGN AND CONTINGENCIES - $90,000) 28 (29) CITY OF NEW KENSINGTON, BRIDGE NO.1, 29 LOCUST STREET, BRIDGE REPLACEMENT 30,000 30 (BASE CONSTRUCTION ALLOCATION - 19910H1959B3288 - 219 -
1 $30,000) 2 (30) CITY OF NEW KENSINGTON, FOURTH STREET 3 BRIDGE NO.2 OVER LITTLE PUCKETA CREEK, 4 BRIDGE CONSTRUCTION 16,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $16,000) 7 (31) CITY OF NEW KENSINGTON, FOURTH STREET 8 BRIDGE NO.2, BRIDGE REPLACEMENT 29,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $29,000) 11 (32) CITY OF NEW KENSINGTON, LOCUST STREET 12 BRIDGE NO.1 OVER CONRAIL RAILROAD, 13 BRIDGE CONSTRUCTION 65,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $65,000) 16 (33) UPPER BURRELL TOWNSHIP, HARTGE ROAD 17 OVER LITTLE PUCKETA CREEK, BRIDGE 18 REPLACEMENT 110,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $100,000) 21 (DESIGN AND CONTINGENCIES - $10,000) 22 (B) STATE BRIDGES 23 (1) S.R.0056, SEWARD BRIDGE OVER RAILROAD 24 AND BOROUGH ROAD, ST. CLAIR TOWNSHIP, 25 BRIDGE REPLACEMENT 2,650,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $2,385,000) 28 (LAND ALLOCATION - $40,000) 29 (DESIGN AND CONTINGENCIES - $225,000) 30 (2) S.R.0070 BRIDGE OVER S.R.3005 NEAR 19910H1959B3288 - 220 -
1 PRICEDALE, ROSTRAVER TOWNSHIP, BRIDGE 2 REHABILITATION 1,405,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $1,250,000) 5 (DESIGN AND CONTINGENCIES - $155,000) 6 (3) S.R.0070 BRIDGE OVER S.R.3003 NEAR 7 SPEERS RUN, ROSTRAVER TOWNSHIP, BRIDGE 8 REHABILITATION 3,424,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $3,140,000) 11 (DESIGN AND CONTINGENCIES - $284,000) 12 (4) S.R.0259, SNYDERS RUN BRIDGE OVER 13 BRANCH OF SNYDERS RUN, FAIRFIELD 14 TOWNSHIP, BRIDGE REPLACEMENT 375,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $315,000) 17 (LAND ALLOCATION - $30,000) 18 (DESIGN AND CONTINGENCIES - $30,000) 19 (5) S.R.0259, CONRAIL BOLIVAR UNDERPASS 20 NO.2 OVER S.R.0259, BOLIVAR BOROUGH AND 21 FAIRFIELD TOWNSHIP, BRIDGE REPLACEMENT 460,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $350,000) 24 (LAND ALLOCATION - $10,000) 25 (DESIGN AND CONTINGENCIES - $100,000) 26 (6) S.R.0711, KOFFER RUN BRIDGE OVER 27 KOFFER RUN, LIGONIER TOWNSHIP, BRIDGE 28 REPLACEMENT 350,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $300,000) 19910H1959B3288 - 221 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $30,000) 3 (7) S.R.1019, HANNA'S RUN BRIDGE OVER 4 BRANCH OF HANNA'S RUN, LIGONIER 5 TOWNSHIP, BRIDGE REPLACEMENT 350,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $300,000) 8 (LAND ALLOCATION - $20,000) 9 (DESIGN AND CONTINGENCIES - $30,000) 10 (8) S.R.1028, LUXOR BRIDGE OVER LITTLE 11 CRABTREE CREEK, HEMPFIELD TOWNSHIP, 12 BRIDGE REPLACEMENT 350,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $300,000) 15 (LAND ALLOCATION - $20,000) 16 (DESIGN AND CONTINGENCIES - $30,000) 17 (9) S.R.1071, HENDRICKS CREEK BRIDGE AND 18 APPROACH, T-987, BRIDGE REPLACEMENT 270,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $240,000) 21 (LAND ALLOCATION - $5,000) 22 (DESIGN AND CONTINGENCIES - $25,000) 23 (10) S.R.3003, SPEERS RUN BRIDGE OVER 24 SPEERS RUN, ROSTRAVER TOWNSHIP, BRIDGE 25 REPLACEMENT 475,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $415,000) 28 (LAND ALLOCATION - $20,000) 29 (DESIGN AND CONTINGENCIES - $40,000) 30 (11) S.R.3022 BRIDGE OVER SMALL STREAM, 19910H1959B3288 - 222 -
1 NORTH HUNTINGDON TOWNSHIP, BRIDGE 2 REPLACEMENT 425,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $370,000) 5 (LAND ALLOCATION - $20,000) 6 (DESIGN AND CONTINGENCIES - $35,000) 7 (12) S.R.4024, BOQUET BRIDGE OVER BRUSH 8 RUN, PENN TOWNSHIP, BRIDGE REPLACEMENT 297,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $263,000) 11 (LAND ALLOCATION - $10,000) 12 (DESIGN AND CONTINGENCIES - $24,000) 13 (13) S.R.0070, I-70 BRIDGE OVER SEWICKLEY 14 CREEK, SEWICKLEY TOWNSHIP, BRIDGE 15 REHABILITATION 660,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $600,000) 18 (DESIGN AND CONTINGENCIES - $60,000) 19 (14) S.R.4075 OVER CHARTIERS RUN, UPPER 20 BURRELL TOWNSHIP, BRIDGE REPLACEMENT 110,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $50,000) 23 (LAND ALLOCATION - $10,000) 24 (DESIGN AND CONTINGENCIES - $50,000) 25 (15) S.R.4036 OVER PUCKETA CREEK, UPPER 26 BURRELL TOWNSHIP, BRIDGE REPLACEMENT 420,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $350,000) 29 (LAND ALLOCATION - $20,000) 30 (DESIGN AND CONTINGENCIES - $50,000) 19910H1959B3288 - 223 -
1 (16) S.R.4032 BRIDGE OVER PUCKETA CREEK, 2 UPPER BURRELL TOWNSHIP, BRIDGE 3 REPLACEMENT 135,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $75,000) 6 (LAND ALLOCATION - $10,000) 7 (DESIGN AND CONTINGENCIES - $50,000) 8 (17) S.R.4075 OVER CHARTIERS RUN, UPPER 9 BURRELL TOWNSHIP, BRIDGE REPLACEMENT 110,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $50,000) 12 (LAND ALLOCATION - $10,000) 13 (DESIGN AND CONTINGENCIES - $50,000) 14 (18) S.R.0366 OVER LITTLE PUCKETA CREEK, 15 CITY OF NEW KENSINGTON, BRIDGE 16 REPLACEMENT 470,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $400,000) 19 (LAND ALLOCATION - $20,000) 20 (DESIGN AND CONTINGENCIES - $50,000) 21 (19) S.R.0056 OVER LITTLE PUCKETA CREEK, 22 CITY OF NEW KENSINGTON, BRIDGE 23 REPLACEMENT 160,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $100,000) 26 (LAND ALLOCATION - $10,000) 27 (DESIGN AND CONTINGENCIES - $50,000) 28 (20) S.R.0056 BRIDGE OVER BRANCH OF 29 PUCKETA CREEK, CITY OF LOWER BURRELL, 30 BRIDGE REPLACEMENT 110,000 19910H1959B3288 - 224 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $50,000) 3 (LAND ALLOCATION - $10,000) 4 (DESIGN AND CONTINGENCIES - $50,000) 5 (21) S.R.0366 OVER PUCKETA CREEK, CITY OF 6 LOWER BURRELL, BRIDGE REPLACEMENT 110,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $50,000) 9 (LAND ALLOCATION - $10,000) 10 (DESIGN AND CONTINGENCIES - $50,000) 11 (22) S.R.3012, SEWICKLEY BRIDGE OVER BIG 12 SEWICKLEY CREEK, SOUTH HUNTINGTON 13 TOWNSHIP, BRIDGE REPLACEMENT 51,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $36,000) 16 (LAND ALLOCATION - $11,000) 17 (DESIGN AND CONTINGENCIES - $4,000) 18 (23) S.R.2033, MANSVILLE BRIDGE OVER 19 KEEFER RUN, COOK TOWNSHIP, BRIDGE 20 REPLACEMENT 59,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $44,000) 23 (LAND ALLOCATION - $11,000) 24 (DESIGN AND CONTINGENCIES - $4,000) 25 (24) S.R.0982, BRADENVILLE BRIDGE OVER 26 SAXMORE RUN, DERRY TOWNSHIP, BRIDGE 27 REPLACEMENT 446,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $385,000) 30 (LAND ALLOCATION - $20,000) 19910H1959B3288 - 225 -
1 (DESIGN AND CONTINGENCIES - $41,000) 2 (25) S.R.1028, LUXOR BRIDGE, HEMPFIELD 3 TOWNSHIP, BRIDGE REPLACEMENT 350,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $300,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $30,000) 8 (26) S.R.0981, SMITHTON BRIDGE OVER BARRON 9 RUN, SOUTH HUNTINGTON TOWNSHIP, BRIDGE 10 REPLACEMENT 196,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $159,000) 13 (LAND ALLOCATION - $12,000) 14 (DESIGN AND CONTINGENCIES - $25,000) 15 (27) S.R.0217, MILLER RUN BRIDGE, DERRY 16 TOWNSHIP, BRIDGE REPLACEMENT 220,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $180,000) 19 (LAND ALLOCATION - $10,000) 20 (DESIGN AND CONTINGENCIES - $30,000) 21 SECTION 70. WYOMING COUNTY. 22 (A) LOCAL BRIDGES (RESERVED) 23 (B) STATE BRIDGES 24 (1) S.R.2021 BRIDGE OVER BRANCH OF BEAVER 25 CREEK, FALLS TOWNSHIP, BRIDGE 26 REPLACEMENT 783,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $690,000) 29 (LAND ALLOCATION - $10,000) 30 (DESIGN AND CONTINGENCIES - $83,000) 19910H1959B3288 - 226 -
1 (2) S.R.2012 BRIDGE OVER BRANCH OF 2 TUNKHANNOCK CREEK, CLINTON TOWNSHIP, 3 BRIDGE REPLACEMENT 884,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $780,000) 6 (LAND ALLOCATION - $10,000) 7 (DESIGN AND CONTINGENCIES - $94,000) 8 (3) S.R.2002 BRIDGE OVER WHITELOCK CREEK, 9 EXETER TOWNSHIP, BRIDGE REPLACEMENT 654,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $575,000) 12 (LAND ALLOCATION - $10,000) 13 (DESIGN AND CONTINGENCIES - $69,000) 14 (4) S.R.3007 BRIDGE OVER RAILROAD, 15 WASHINGTON TOWNSHIP, BRIDGE 16 REPLACEMENT 915,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $808,000) 19 (LAND ALLOCATION - $10,000) 20 (DESIGN AND CONTINGENCIES - $97,000) 21 (5) S.R.1025 BRIDGE OVER CONRAIL RAILROAD, 22 NICHOLSON BOROUGH, BRIDGE REPLACEMENT 783,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $690,000) 25 (LAND ALLOCATION - $10,000) 26 (DESIGN AND CONTINGENCIES - $83,000) 27 (6) S.R.2027 BRIDGE OVER BEAVER CREEK, 28 FALLS TOWNSHIP, BRIDGE REPLACEMENT 404,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $352,000) 19910H1959B3288 - 227 -
1 (LAND ALLOCATION - $10,000) 2 (DESIGN AND CONTINGENCIES - $42,000) 3 (7) S.R.0011 OVER T.R.6, CLINTON TOWNSHIP, 4 BRIDGE REPLACEMENT 1,240,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $1,100,000) 7 (LAND ALLOCATION - $10,000) 8 (DESIGN AND CONTINGENCIES - $130,000) 9 (8) S.R.0006 OVER TUSCARORA CREEK, 10 BRAINTRIM TOWNSHIP, BRIDGE REPLACEMENT 1,910,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $1,700,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $200,000) 15 (9) S.R.1014 BRIDGE OVER LAKE SHERIDAN 16 OUTLET, NICHOLSON TOWNSHIP, BRIDGE 17 REPLACEMENT 390,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $340,000) 20 (LAND ALLOCATION - $10,000) 21 (DESIGN AND CONTINGENCIES - $40,000) 22 (10) S.R.0087 BRIDGE OVER SUSQUEHANNA 23 RIVER, MEHOOPANY TOWNSHIP, BRIDGE 24 REPLACEMENT 5,210,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $4,700,000) 27 (LAND ALLOCATION - $10,000) 28 (DESIGN AND CONTINGENCIES - $500,000) 29 (11) S.R.0029 BRIDGE OVER BOWMAN'S CREEK, 30 NOXEN TOWNSHIP, BRIDGE REPLACEMENT 732,000 19910H1959B3288 - 228 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $645,000) 3 (LAND ALLOCATION - $10,000) 4 (DESIGN AND CONTINGENCIES - $77,000) 5 (12) S.R.2039 BRIDGE OVER BEAVER RUN 6 CREEK, NOXEN TOWNSHIP, BRIDGE 7 REPLACEMENT 738,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $650,000) 10 (LAND ALLOCATION - $10,000) 11 (DESIGN AND CONTINGENCIES - $78,000) 12 (13) S.R.3001 BRIDGE OVER LITTLE MEHOOPANY 13 CREEK, WINDHAM TOWNSHIP, BRIDGE 14 REPLACEMENT 486,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $425,000) 17 (LAND ALLOCATION - $10,000) 18 (DESIGN AND CONTINGENCIES - $51,000) 19 (14) S.R.3002 BRIDGE OVER BOWMAN'S CREEK, 20 NOXEN TOWNSHIP, BRIDGE REPLACEMENT 928,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $820,000) 23 (LAND ALLOCATION - $10,000) 24 (DESIGN AND CONTINGENCIES - $98,000) 25 (15) S.R.0029 BRIDGE OVER SWAIL BROOK, 26 TUNKHANNOCK BOROUGH, BRIDGE 27 REPLACEMENT 540,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $473,000) 30 (LAND ALLOCATION - $10,000) 19910H1959B3288 - 229 -
1 (DESIGN AND CONTINGENCIES - $57,000) 2 (16) S.R.0092 BRIDGE OVER FIELD BROOK, 3 NICHOLSON TOWNSHIP, BRIDGE REPLACEMENT 520,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $455,000) 6 (LAND ALLOCATION - $10,000) 7 (DESIGN AND CONTINGENCIES - $55,000) 8 (17) S.R.0307 BRIDGE OVER BUTTERMILK 9 CREEK, FALLS TOWNSHIP, BRIDGE 10 REPLACEMENT 592,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $520,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $62,000) 15 (18) S.R.0307 BRIDGE OVER BEAVER CREEK, 16 FALLS TOWNSHIP, BRIDGE REPLACEMENT 1,208,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $1,070,000) 19 (LAND ALLOCATION - $10,000) 20 (DESIGN AND CONTINGENCIES - $128,000) 21 (19) S.R.0307 BRIDGE OVER BUTTERMILK 22 CREEK, FALLS TOWNSHIP, BRIDGE 23 REPLACEMENT 682,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $600,000) 26 (LAND ALLOCATION - $10,000) 27 (DESIGN AND CONTINGENCIES - $72,000) 28 (20) S.R.1009 BRIDGE OVER MESHOPPEN CREEK, 29 LEMON TOWNSHIP, BRIDGE REPLACEMENT 794,000 30 (BASE CONSTRUCTION ALLOCATION - 19910H1959B3288 - 230 -
1 $700,000) 2 (LAND ALLOCATION - $10,000) 3 (DESIGN AND CONTINGENCIES - $84,000) 4 (21) S.R.0006, SEGMENT 0490 OFFSET 0000, 5 BARDWELL BRIDGE OVER TUNKHANNOCK CREEK, 6 TUNKHANNOCK TOWNSHIP, BRIDGE 7 REPLACEMENT 2,260,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $2,000,000) 10 (LAND ALLOCATION - $10,000) 11 (DESIGN AND CONTINGENCIES - $250,000) 12 (22) S.R.0006, SEGMENT 0560 OFFSET 0866, 13 BRIDGE OVER S.R.1017, CLINTON TOWNSHIP, 14 BRIDGE REPLACEMENT 700,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $620,000) 17 (LAND ALLOCATION - $10,000) 18 (DESIGN AND CONTINGENCIES - $70,000) 19 (23) S.R.0117 SEGMENT 0020 OFFSET 1773, 20 BRIDGE OVER OUTLET OF LAKE SHERIDAN, 21 FACTORYVILLE BOROUGH, BRIDGE 22 REPLACEMENT 280,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $240,000) 25 (LAND ALLOCATION - $10,000) 26 (DESIGN AND CONTINGENCIES - $30,000) 27 SECTION 71. YORK COUNTY. 28 (A) LOCAL BRIDGES 29 (1) PENN TOWNSHIP, FREDERICK STREET BRIDGE 30 OVER PLUM CREEK, BRIDGE REPLACEMENT 250,000 19910H1959B3288 - 231 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $200,000) 3 (LAND ALLOCATION - $10,000) 4 (DESIGN AND CONTINGENCIES - $40,000) 5 (2) CITY OF YORK, NORTH BEAVER STREET 6 BRIDGE OVER WILLIS RUN, BRIDGE 7 REPLACEMENT 362,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $300,000) 10 (LAND ALLOCATION - $12,000) 11 (DESIGN AND CONTINGENCIES - $50,000) 12 (3) CITY OF YORK, NORTH PERSHING AVENUE 13 BRIDGE OVER WILLIS RUN, BRIDGE 14 REPLACEMENT 338,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $288,000) 17 (LAND ALLOCATION - $10,000) 18 (DESIGN AND CONTINGENCIES - $40,000) 19 (4) CITY OF YORK, NORTH NEWBERRY STREET 20 BRIDGE OVER WILLIS RUN BRIDGE 21 REPLACEMENT 360,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $300,000) 24 (LAND ALLOCATION - $10,000) 25 (DESIGN AND CONTINGENCIES - $50,000) 26 (5) CITY OF YORK, SMITH STREET BRIDGE OVER 27 WILLIS RUN, BRIDGE REPLACEMENT 338,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $288,000) 30 (LAND ALLOCATION - $10,000) 19910H1959B3288 - 232 -
1 (DESIGN AND CONTINGENCIES - $40,000) 2 (6) NEW FREEDOM BOROUGH, COUNTY BRIDGE ON 3 SINGER ROAD OVER COUNTY RAILROAD AND 4 TRAIL, BRIDGE REPLACEMENT 325,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $250,000) 7 (LAND ALLOCATION - $10,000) 8 (DESIGN AND CONTINGENCIES - $65,000) 9 (B) STATE BRIDGES 10 (1) S.R.0295, SUSQUEHANNA TRAIL OVER 11 CONEWAGO CREEK, CONEWAGO AND NEWBERRY 12 TOWNSHIPS, BRIDGE REPLACEMENT 6,260,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $5,400,000) 15 (LAND ALLOCATION - $50,000) 16 (DESIGN AND CONTINGENCIES - $810,000) 17 (2) S.R.4021 OVER BENNETTS RUN, NEWBERRY 18 TOWNSHIP, BRIDGE REPLACEMENT 581,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $497,000) 21 (LAND ALLOCATION - $10,000) 22 (DESIGN AND CONTINGENCIES - $74,000) 23 (3) S.R.0216, THREE BRIDGES OVER LAKE 24 MARBURG, PENN, WEST MANHEIM AND MANHEIM 25 TOWNSHIPS, BRIDGE REHABILITATION 970,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $825,000) 28 (LAND ALLOCATION - $20,000) 29 (DESIGN AND CONTINGENCIES - $125,000) 30 SECTION 72. STATEWIDE. 19910H1959B3288 - 233 -
1 (A) (RESERVED) 2 (B) STATE BRIDGES 3 (1) STATEWIDE BRIDGE PRESERVATION 5,000,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $4,500,000) 6 (DESIGN AND CONTINGENCIES - $500,000) 7 Section 72 73. Limitation on expenditure of funds. <-- 8 Any moneys derived from the incurring of debt shall be used 9 solely for effecting the rehabilitation, replacement or removal 10 of bridges located on State highways. All other bridge 11 rehabilitation, replacement or removal shall be financed, and 12 State bridge rehabilitation, replacement or removal may also be 13 financed, from current revenue. 14 Section 73 74. Debt authorization. <-- 15 The Governor, Auditor General and State Treasurer are hereby 16 authorized and directed to borrow, from time to time, in 17 addition to any authorization heretofore or hereafter enacted, 18 on the credit of the Commonwealth, subject to the limitations 19 provided in the current capital budget, money not exceeding in 20 the aggregate the sum of $5,250,000 $596,448,000 as may be found <-- 21 necessary to carry out the acquisition and construction of the 22 State highway projects specifically itemized in this act. 23 Section 74 75. Issue of bonds. <-- 24 The indebtedness authorized in this act shall be incurred 25 from time to time and shall be evidenced by one or more series 26 of general obligation bonds of the Commonwealth in such 27 aggregate principal amount for each series as the Governor, 28 Auditor General and State Treasurer shall determine, but the 29 latest stated maturity date shall not exceed 30 years from the 30 date of the bond first issued for each series. 19910H1959B3288 - 234 -
1 Section 75 76. Estimated useful life of projects. <-- 2 The General Assembly states the estimated useful life of the 3 projects itemized in this act as 30 years. 4 Section 76 77. Appropriation. <-- 5 The net proceeds of the sale of the obligations authorized in 6 this act are hereby appropriated from the Capital Facilities 7 Fund to the department in the maximum amount of $5,250,000 <-- 8 $596,448,000 to be used by it exclusively to defray the 9 financial costs of the State projects specifically itemized in 10 this capital budget. After reserving or paying the expenses of 11 the sale of the obligation, the State Treasurer shall pay out to 12 the department the moneys as required and certified by it to be 13 legally due and payable. 14 Section 77 78. Federal funds. <-- 15 In addition to those funds appropriated in section 76 77, all <-- 16 moneys received from the Federal Government for the public 17 improvement projects specifically itemized in this act are also 18 hereby appropriated for those projects. 19 Section 78 79. Allocation of funds. <-- 20 (a) General rule.--Whenever the department determines that 21 the full estimated financial costs of the projects itemized in 22 this act are not necessary for the proper design, acquisition or 23 construction of such projects, the excess funds no longer 24 required may be allocated by the department to increase the 25 estimated costs of any one or more of the projects specifically 26 itemized in a capital budget. 27 (b) Reimbursement of municipal expenditures.--Moneys raised 28 or expended by municipalities after the effective date of this 29 act, in anticipation of receipt of funds authorized for projects 30 itemized by this act, may be reimbursable to those 19910H1959B3288 - 235 -
1 municipalities. 2 Section 79 80. Policy on jobs and materials. <-- 3 (a) Jobs.--It is the declared policy of the Commonwealth 4 that the construction projects authorized in this act be used, 5 to the greatest extent possible, to provide for the creation of 6 jobs and the rehiring of the unemployed in this Commonwealth. In 7 order to reach this goal, firms with Commonwealth-based 8 facilities shall be actively solicited to make bids on contracts 9 to furnish products and materials, including, but not limited 10 to, steel and steel products, to be used in these projects. 11 (b) Materials.--Every contract document entered into to 12 undertake a project contained in this act shall provide that any 13 steel or other products to be used or supplied in the 14 performance of this contract shall be required to be 15 manufactured by plants in the United States unless the secretary 16 determines, on a contract by contract basis, that certain 17 required products are not produced in the United States in 18 sufficient quantities to meet the requirements of the contract. 19 Such a determination and the reasons therefor shall be published 20 in the Pennsylvania Bulletin. Decisions made under this 21 subsection shall not be inconsistent with the general provisions 22 of the act of March 3, 1978 (P.L.6, No.3), known as the Steel 23 Products Procurement Act. 24 Section 80 81. Payment of capital debt service. <-- 25 The repayment of any debt incurred pursuant to this act shall 26 be made from the account and such repayment shall have first 27 claim on the revenues of the account. 28 Section 81 82. Authorization and debt cumulation. <-- 29 The additional authorization and debt allowance provided for 30 in this act shall be added to the total authorizations and debt 19910H1959B3288 - 236 -
1 incurred pursuant to the act of December 8, 1982 (P.L.848,
2 No.235), known as the Highway-Railroad and Highway Bridge
3 Capital Budget Act for 1982-1983, as amended.
4 Section 82 83. Effective date. <--
5 This act shall take effect immediately.
G29L72RZ/19910H1959B3288 - 237 -