PRIOR PRINTER'S NO. 600                       PRINTER'S NO. 1775

THE GENERAL ASSEMBLY OF PENNSYLVANIA


HOUSE BILL

No. 552 Session of 1977


        INTRODUCED BY MESSRS. ITKIN, B. F. O'BRIEN, MISCEVICH, ABRAHAM,
           TRELLO, GAMBLE, McCALL, LEHR AND J. L. WRIGHT, MARCH 7, 1977

        AS REPORTED FROM COMMITTEE ON MINES AND ENERGY MANAGEMENT, HOUSE
           OF REPRESENTATIVES, AS AMENDED, JULY 13, 1977

                                     AN ACT

     1  Providing for the regulation for energy conservation purposes     <--
     2     the construction of public industrial and commercial
     3     buildings, the establishment of an advisory committee,
     4     appeals, and for penalties.
     1  PROVIDING FOR THE REGULATION FOR ENERGY CONSERVATION PURPOSES OF  <--
     2     THE CONSTRUCTION OF BUILDINGS, THE ESTABLISHMENT OF A
     3     BUILDING ENERGY CONSERVATION COMMITTEE, APPEALS AND FOR
     4     PENALTIES.

     5                         TABLE OF CONTENTS
     6  CHAPTER 1.  GENERAL PROVISIONS
     7     SECTION 101.  SHORT TITLE.
     8     SECTION 102.  LEGISLATIVE FINDINGS AND DECLARATION OF
     9                   PURPOSE.
    10     SECTION 103.  DEFINITIONS.
    11  CHAPTER 2.  ENERGY CONSERVATION STANDARDS
    12     SECTION 201.  PROVISIONS.
    13     SUBCHAPTER A.  PLANS AND SPECIFICATIONS
    14     SECTION 202.  SUBMISSION.
    15     SECTION 203.  CONTENTS.
    16     SUBCHAPTER B.  DEFINITIONS RELATING TO ENERGY CONSERVATION


     1                    STANDARDS
     2     SECTION 204.  DEFINITIONS RELATING TO STANDARDS.
     3     SUBCHAPTER C.  BUILDING ENVELOPE
     4     SECTION 205.  GENERAL PROVISIONS.
     5     SECTION 206.  CRITERIA FOR RESIDENTIAL BUILDINGS.
     6     SECTION 207.  OTHER BUILDINGS.
     7     SECTION 208.  AIR LEAKAGE.
     8     SUBCHAPTER D.  WARM AIR HEATING, VENTILATING AND AIR
     9                    CONDITIONING SYSTEMS AND EQUIPMENT
    10     SECTION 209.  GENERAL PROVISIONS.
    11     SECTION 210.  DESIGN REQUIREMENTS.
    12     SECTION 211.  COOLING WITH OUTDOOR AIR.
    13     SECTION 212.  MECHANICAL VENTILATION.
    14     SECTION 213.  SIMULTANEOUS HEATING AND COOLING.
    15     SECTION 214.  REHEAT SYSTEMS.
    16     SECTION 215.  DUAL DUCT AND MULTIZONE SYSTEMS.
    17     SECTION 216.  RECOOLING SYSTEMS.
    18     SECTION 217.  MULTIPLE ZONES.
    19     SECTION 218.  CONCURRENT OPERATION.
    20     SECTION 219.  EQUIPMENT PERFORMANCE REQUIREMENTS.
    21     SECTION 220.  DUCT INSULATION.
    22     SECTION 221.  SYSTEM CONTROLS.
    23     SECTION 222.  STEAM AND HOT WATER HEATING PIPING.
    24     SUBCHAPTER E.  PLUMBING SYSTEMS
    25     SECTION 223.  PURPOSE.
    26     SECTION 224.  FIXTURES.
    27     SECTION 225.  INSULATION.
    28     SECTION 226.  EQUIPMENT.
    29     SECTION 227.  CONTROLS.
    30     SUBCHAPTER F.  ELECTRICAL SYSTEMS
    19770H0552B1775                  - 2 -

     1     SECTION 228.  SYSTEM REQUIREMENTS.
     2     SUBCHAPTER G.  LIGHTING
     3     SECTION 229.  LIGHT POWER BUDGET.
     4     SECTION 230.  CALCULATION METHODS.
     5     SECTION 231.  BUILDING INTERIORS.
     6     SECTION 232.  BUILDING EXTERIORS.
     7     SECTION 233.  EXCEPTIONS TO CRITERIA.
     8     SECTION 234.  CALCULATION PROCEDURE.
     9     SUBCHAPTER H.  ALTERNATIVE SYSTEMS
    10     SECTION 235.  PERFORMANCE ALTERNATIVE.
    11     SECTION 236.  NONDEPLETABLE SOURCES.
    12     SECTION 237.  DOCUMENTATION.
    13  CHAPTER 3.  APPLICATION OF STANDARDS:  ESTABLISHMENT OF
    14              COMMITTEE AND PENALTIES
    15     SECTION 301.  MODIFICATION OF STANDARDS; CRITERIA.
    16     SECTION 302.  APPLICATION OF ENERGY CONSERVATION STANDARDS.
    17     SECTION 303.  ENERGY CONSERVATION MANUAL FOR BUILDINGS.
    18     SECTION 304.  BUILDING ENERGY CONSERVATION COMMITTEE.
    19     SECTION 305.  CERTIFICATION.
    20     SECTION 306.  VARIANCES.
    21     SECTION 307.  BUILDING PERMITS.
    22     SECTION 308.  PERMITS FOR USE OR OCCUPANCY.
    23     SECTION 309.  FAILURE TO SUBMIT CERTIFICATION.
    24     SECTION 310.  INSPECTIONS.
    25     SECTION 311.  FAILURE TO COMPLY WITH PROVISIONS OF THIS ACT.
    26     SECTION 312.  APPEALS.
    27     SECTION 313.  PENALTIES.
    28     SECTION 314.  ENFORCEMENT.
    29     SECTION 315.  EFFECTIVE DATE.
    30     The General Assembly of the Commonwealth of Pennsylvania
    19770H0552B1775                  - 3 -

     1  hereby enacts as follows:
     2  Section 1.  Short title.                                          <--
     3     This act shall be known and may be cited as the "Building
     4  Energy Conservation Act."
     5  Section 2.  Legislative findings and declaration of purpose.
     6     (a)  The Legislature hereby determines that:
     7         (1)  Energy shortages in the domestic supply present far
     8     reaching problems that promise to persist. These energy
     9     shortages effect the continued efficient operation of the
    10     Commonwealth's economy and social structure.
    11         (2)  It is the Commonwealth's responsibility to provide
    12     for energy conservation in several classes of buildings
    13     through regulation of design and construction standards.
    14         (3)  The Legislature intends, by this act, to respond to
    15     these shortages by devising a specific responsible energy
    16     conservation policy for building systems.
    17     (b)  The purpose of this act is to grant to the Commonwealth
    18  of Pennsylvania and direct it to exercise specific authority in
    19  public, commercial and industrial building construction to
    20  assure that such construction is performed using materials and
    21  techniques that will provide for energy conservation in the
    22  future operation and maintenance of said structure.
    23  Section 3.  Definitions.
    24     The following words and phrases when used in this act shall
    25  have, unless the context clearly indicates otherwise, the
    26  meanings given to them in this section:
    27     "Building."  Any structure included in the Class I, II, III,
    28  IV building categories cited in section 2, act of April 27, 1927
    29  (P.L.465, No.299), referred to as the Fire and Panic Act, except
    30  for:
    19770H0552B1775                  - 4 -

     1         (1)  structures that will not consume energy for heating
     2     or cooling for the comfort of personnel using the structure,
     3     or whose peak design rate of energy usage is less than one
     4     watt/square foot of floor area for normal purposes;
     5         (2)  structures or those portions of structures used for
     6     manufacturing or processing and whose manufacturing or
     7     processing procedures require the use of substantial heat
     8     producing energy to create their product;
     9         (3)  single and two-family dwellings; and
    10         (4)  buildings in the Class I, II, III, IV building
    11     categories under 5,000 square feet of floor area.
    12     "Constructed."  The erection, fabrication, reconstructions or
    13  conversion.
    14     "Department."  The Pennsylvania Department of Labor and
    15  Industry.
    16     "Design."  Calculations and resultant drawings and
    17  specifications which are used for the construction of a
    18  building.
    19     "Reconstruction."  The rehabilitation of an existing building
    20  to reasonably place it in its original structural condition and
    21  which requires more than 50% of the entire building to be
    22  rebuilt.
    23  Section 4.  Adoption and promulgation of standards.
    24     The department shall, after one or more public hearings,
    25  adopt and publish energy conservation standards for all new
    26  buildings. The purpose of such standards is to reduce wasteful
    27  or uneconomic consumption of energy by balancing the cost of
    28  energy procurement against the cost of energy-conserving
    29  building practices. The energy conservation standards shall meet
    30  the following criteria:
    19770H0552B1775                  - 5 -

     1         (1)  They shall be consistent with the latest and most
     2     effective technology.
     3         (2)  They shall provide adequate safeguards for public
     4     health and safety.
     5         (3)  They shall be economically feasible.
     6         (4)  They shall be sufficiently stringent to effect a
     7     significant savings of energy resources by both residential
     8     buildings regulated by the act and nonresidential buildings.
     9         (5)  They shall include both performance and procedural
    10     standards.
    11  Section 5.  Performance standards.
    12     The department shall establish standards for the design of
    13  buildings and systems within buildings to assure maximum
    14  practical conservation of energy. These standards shall
    15  establish parameters within which designers of buildings shall
    16  work. The specific practices that a designer employs shall not
    17  be prescribed, as long as the result is within the parameters
    18  established by the standards.
    19  Section 6.  Procedural standards.
    20     The procedural standards shall be directed toward specific
    21  design and building practices that produce building envelopes
    22  with good thermal resistance and low air leakage and toward
    23  requiring practices in the designing of mechanical and
    24  electrical systems which conserve energy.
    25  Section 7.  Residential and nonresidential structures.
    26     The construction of both nonresidential and residential
    27  structures shall be in accordance with standards developed by
    28  the department. In the development of such standards, the
    29  department shall consider building and energy standards
    30  promulgated by national and other State governmental agencies,
    19770H0552B1775                  - 6 -

     1  private organizations, and any other available energy data, as
     2  well as the total energy allocation approach. The standards
     3  shall provide for a baseline reference for normal, acceptable
     4  practices and maximum rates of allowable energy consumption in
     5  the performance standards, or procedural standards which may be
     6  used at the option of the owner and/or his architect, engineer
     7  or design-builder. The department shall review the distinction
     8  between residential and nonresidential structures, locations,
     9  uses and occupancies to determine if different standards are
    10  required.
    11  Section 8.  Applicability of energy conservation standards.
    12     The energy conservation standards shall take effect six
    13  months after their adoption and are published as regulations in
    14  the Pennsylvania Bulletin in accordance with the act of July 31,
    15  1968 (P.L.769, No.240), known as the "Commonwealth Documents
    16  Law" and shall apply only to new buildings on which actual
    17  construction and/or design has not commenced prior to their
    18  effective date.
    19  Section 9.  Energy conservation manual for buildings.
    20     (a)  Concurrent with the adoption of the energy conservation
    21  standards required by this act, the department shall produce an
    22  energy conservation manual for use by designers, builders, and
    23  contractors of residential and nonresidential buildings. The
    24  manual shall be furnished upon request to members of the public
    25  at a price sufficient to cover the cost of printing.
    26     (b)  The manual shall be reviewed at least annually and shall
    27  be updated as significant new energy conservation information
    28  becomes available.
    29  Section 10.  Building Energy Conservation Committee.
    30     (a)  In order to further the coordinated and effective
    19770H0552B1775                  - 7 -

     1  administration of this act, there shall be established a
     2  Building Energy Conservation Committee, the membership of which
     3  shall be appointed by the Secretary of Labor and Industry and
     4  shall include a representative recommended by the Department of
     5  Education, the Governor's Energy Council, Department of General
     6  Services, Department of Labor and Industry, Pennsylvania
     7  Builders Association, Pennsylvania Chamber of Commerce, General
     8  Contractors Association of Pennsylvania, Pennsylvania Society of
     9  Architects, Pennsylvania Society of Professional Engineers, and
    10  such other organizations or individuals as the secretary may
    11  find are necessary and proper to carry out the purposes of the
    12  committee.
    13     (b)  Said committee shall be responsible for the regular
    14  exchange of information and plans regarding building energy
    15  conservation, for the development and review of proposed and
    16  existing standards, guidelines, regulations, and manuals, and
    17  shall make recommendations to the industrial board consistent
    18  with the provisions of this act.
    19     (c)  Said committee shall also act as an advisory committee
    20  to the industrial board and/or the advisory board on building
    21  construction in matters of building energy conservation and may
    22  recommend to the board variances from standards, guidelines,
    23  regulations and manuals after consultation within the committee
    24  or with any person affected by such standards, guidelines,
    25  regulations or manuals.
    26     (d)  The members of the committee shall not receive any
    27  compensation for their services but shall be reimbursed for
    28  their actual and necessary expenses incurred in the performance
    29  of their duties. Provided, however, when acting as an advisory
    30  committee to the industrial board or the advisory board on
    19770H0552B1775                  - 8 -

     1  building construction on matters concerning variances or appeals
     2  which have been referred to the industrial board, they shall
     3  receive $50 per day plus their actual and necessary expenses.
     4  Section 11.  Approval of plans.
     5     (a)  It shall be the duty of the owner, architect, engineer,
     6  or design-builder of every building or structure, as described
     7  in this act, hereafter constructed, to submit to the department
     8  for approval, drawings, specifications, and/or other data
     9  showing compliance with the provisions of this act and the rules
    10  and regulations of the said department which may be promulgated
    11  for the enforcement of the provisions of this act. No such
    12  building or structure shall be constructed until such plans have
    13  been examined and approval given by the department and a
    14  building permit obtained in municipalities where such permit is
    15  required by ordinance.
    16     (b)  For making the necessary examination for approval of
    17  drawings, specifications, and/or other data, the department
    18  shall make a charge equal to the actual cost of making such
    19  examinations. Such charges shall be consistent with the maximum
    20  fees permitted by the act of April 27, 1927 (P.L.465, No.299),
    21  referred to as the Fire and Panic Act. The approvals required by
    22  this act shall be given at the same time and under the same
    23  conditions as those approvals required to be obtained prior to
    24  construction by the Fire and Panic Act.
    25  Section 12.  Permits for use or occupancy.
    26     Before any building or structure hereafter constructed shall
    27  be used or opened for occupancy, the owner thereof shall notify
    28  the Department of Labor and Industry of the completion of the
    29  structure. If the department finds, after proper investigation,
    30  that the building or structure complies with the requirements of
    19770H0552B1775                  - 9 -

     1  this act, and the rules and regulations promulgated for the
     2  enforcement of the provisions of this act, then the department
     3  shall issue to the owner of the building or structure a permit
     4  authorizing the occupancy or use of the building or structure.
     5  Section 13.  Failure to submit plans or obtain approval.
     6     Whenever the owner of any building or structure to be
     7  constructed shall fail to submit plans to the department or
     8  having submitted plans, shall have failed to obtain approval of
     9  such plans, and shall nevertheless proceed with the work of
    10  constructing the building, the department shall serve notice on
    11  the said owner, or his architect, engineer or contractor to
    12  immediately cease all work on said building; and a notice shall
    13  be placed on the premises prohibiting such work being performed
    14  until the said plans have been submitted and approval given by
    15  the department.
    16  Section 14.  Failure to comply with provisions of this act.
    17     Whenever the owner of any building, as described in this act,
    18  shall fail to comply with the provisions of this act, or the
    19  rules and regulations of the department formulated under the
    20  authority of this act, and upon whom a written order shall be
    21  served by the department to comply with the said provisions of
    22  this act and the rules and regulations of the department and who
    23  nevertheless shall have failed to comply with the said written
    24  order within the time specified in the same, the department
    25  shall be authorized to immediately order the building or
    26  structure to be vacated or placed out of service until such time
    27  as the requirements of the act and the rules and regulations of
    28  the department shall have been fully complied with.
    29  Section 15.  Prosecutions.
    30     (a)  Any person who shall violate any of the provisions of
    19770H0552B1775                 - 10 -

     1  this act, or the rules and regulations of the orders for the
     2  enforcement of the said provisions or rules and regulations
     3  issued by duly authorized officers of the department or who
     4  shall hinder, delay or interfere with any officer charged with
     5  the enforcement of this act in the performance of his duty,
     6  shall, upon conviction thereof, be punished by a fine of $300
     7  and costs, or not more than three months imprisonment in the
     8  county jail, or either, or both, in the discretion of the court.
     9     (b)  Any person who shall fail or refuse to vacate a building
    10  or portion of a building, or who shall fail to cease work in the
    11  constructing of a building, or who shall fail to vacate or place
    12  out of service any building, after due notice having been served
    13  upon him by an officer of the department and proper notice
    14  having been placed upon the building or structure by such
    15  officer, shall be liable for a penalty of $100 a day for each
    16  day he shall have so failed or refused to vacate, cease work on,
    17  or place out of service the building, portion of building upon
    18  which such notice has been placed, the said penalty to be
    19  collectible in the same manner as any fine payable to the
    20  Commonwealth.
    21     (c)  Prosecutions for violations of this act, or the rules
    22  and regulations of the department may be instituted by the
    23  Secretary of Labor and Industry, or under his directions by any
    24  authorized representative of the department. Upon conviction
    25  after a hearing the sentences provided in this act shall be
    26  imposed, and shall be final unless an appeal be taken in the
    27  manner prescribed by law.
    28     (d)  All fines collected under this act shall be forwarded to
    29  the department who shall pay the same into the State Treasury
    30  for the use of the Commonwealth.
    19770H0552B1775                 - 11 -

     1  Section 16.  Enforcement.
     2     (a)  The provisions of this act shall apply to every building
     3  enumerated in this act, except buildings owned by the Federal
     4  Government, including buildings owned in whole or in part by the
     5  Commonwealth or any political subdivision thereof, and shall be
     6  enforced by the Secretary of Labor and Industry, by and through
     7  his authorized representatives, provided, that nothing in this
     8  act shall be construed as affecting buildings in cities of the
     9  first class, second class, and second class A.
    10     (b)  For the purpose of enforcing the provisions of this act,
    11  all the officers charged with its enforcement shall have the
    12  power to enter any of the buildings enumerated in this act, and
    13  no person shall hinder or delay, or interfere with any of the
    14  said officers in the performance of his duty, nor refuse any
    15  pertinent information necessary to determine whether the
    16  provisions of this act and the rules and regulations herein
    17  provided for, are or will be complied with.
    18  Section 17.  Effective date.
    19     This act shall take effect immediately.
    20                             CHAPTER 1                              <--
    21                         GENERAL PROVISIONS
    22  SECTION 101.  SHORT TITLE.
    23     THIS ACT SHALL BE KNOWN AND MAY BE CITED AS THE "BUILDING
    24  ENERGY CONSERVATION ACT."
    25  SECTION 102.  LEGISLATIVE FINDINGS AND DECLARATION OF PURPOSE.
    26     (A)  FINDINGS.--THE LEGISLATURE HEREBY DETERMINES THAT:
    27         (1)  ENERGY SHORTAGES IN THE DOMESTIC SUPPLY PRESENT FAR-
    28     REACHING PROBLEMS THAT PROMISE TO PERSIST. THESE ENERGY
    29     SHORTAGES EFFECT THE CONTINUED EFFICIENT OPERATION OF THE
    30     COMMONWEALTH'S ECONOMY AND SOCIAL STRUCTURE.
    19770H0552B1775                 - 12 -

     1         (2)  IT IS THE COMMONWEALTH'S RESPONSIBILITY TO PROVIDE
     2     FOR ENERGY CONSERVATION THROUGH REGULATION OF DESIGN AND
     3     CONSTRUCTION STANDARDS.
     4         (3)  THE LEGISLATURE INTENDS, BY THIS ACT, TO RESPOND TO
     5     THESE SHORTAGES BY DEVISING A SPECIFIC RESPONSIBLE ENERGY
     6     CONSERVATION POLICY FOR BUILDING SYSTEMS.
     7     (B)  PURPOSE.--THE PURPOSE OF THIS ACT IS TO GRANT TO THE
     8  COMMONWEALTH OF PENNSYLVANIA AND DIRECT IT TO EXERCISE SPECIFIC
     9  AUTHORITY IN BUILDING CONSTRUCTION TO ASSURE THAT SUCH
    10  CONSTRUCTION IS PERFORMED USING MATERIALS AND TECHNIQUES THAT
    11  WILL PROVIDE FOR ENERGY CONSERVATION IN THE FUTURE OPERATION AND
    12  MAINTENANCE OF SAID STRUCTURE.
    13  SECTION 103.  DEFINITIONS.
    14     THE FOLLOWING WORDS AND PHRASES WHEN USED IN THIS ACT SHALL
    15  HAVE, UNLESS THE CONTEXT CLEARLY INDICATES OTHERWISE, THE
    16  MEANINGS GIVEN TO THEM IN THIS SECTION:
    17     "BUILDING."  ANY STRUCTURE THAT PROVIDES FACILITIES OR
    18  SHELTER FOR PUBLIC ASSEMBLY OR FOR EDUCATIONAL, BUSINESS,
    19  MERCANTILE, INSTITUTIONAL, WAREHOUSE OR RESIDENTIAL OCCUPANCY,
    20  OR INDUSTRIAL USE INCLUDING, BUT NOT LIMITED TO, THOSE PORTIONS
    21  OF FACTORY AND INDUSTRIAL OCCUPANCY SUCH AS OFFICE SPACE EXCEPT
    22  FOR:
    23         (1)  BUILDINGS AND STRUCTURES OR PORTIONS THEREOF WHOSE
    24     PEAK DESIGN RATE OF ENERGY USAGE IS LESS THAN ONE WATT PER
    25     SQUARE FOOT OR 3.4 BTU/HR PER SQUARE FOOT OF FLOOR AREA FOR
    26     ALL PURPOSES.
    27         (2)  STRUCTURES OR THOSE PORTIONS OF STRUCTURES USED FOR
    28     MANUFACTURING OR PROCESSING AND WHOSE MANUFACTURING OR
    29     PROCESSING PROCEDURES REQUIRE THE USE OF SUBSTANTIAL HEAT
    30     PRODUCING ENERGY TO CREATE THEIR PRODUCT.
    19770H0552B1775                 - 13 -

     1         (3)  BUILDINGS WHICH ARE NEITHER HEATED NOR COOLED.
     2         (4)  HISTORIC BUILDINGS.
     3     "CONSTRUCTION."  THE ERECTION, FABRICATION OR RENOVATION OF A
     4  BUILDING.
     5     "DEPARTMENT."  THE PENNSYLVANIA DEPARTMENT OF LABOR AND
     6  INDUSTRY.
     7     "DESIGN."  CALCULATIONS AND RESULTANT DRAWINGS AND
     8  SPECIFICATIONS WHICH ARE USED FOR THE CONSTRUCTION OF A
     9  BUILDING.
    10     "HISTORIC BUILDING."  ANY BUILDING WHICH IS DELIBERATELY
    11  PRESERVED BEYOND ITS NORMAL TERM OF USE BECAUSE OF HISTORIC
    12  ASSOCIATIONS, ARCHITECTURAL INTEREST, OR PUBLIC POLICY; OR WHICH
    13  QUALIFIES FOR SPECIAL HISTORIC BUILDING CODE PROVISIONS.
    14     "LIFE-CYCLE COST."  THE COST OF A BUILDING INCLUDING ITS
    15  INITIAL COST, THE COST OF THE ENERGY CONSUMED OVER ITS ECONOMIC
    16  LIFE AND THE COST OF ITS OPERATION AND MAINTENANCE.
    17     "PERFORMANCE STANDARDS."  PARAMETERS WITHIN WHICH DESIGNERS
    18  OF BUILDINGS SHALL WORK. THE SPECIFIC PRACTICES THAT A DESIGNER
    19  EMPLOYS SHALL NOT BE PRESCRIBED AS LONG AS THE RESULT IS WITHIN
    20  THE PARAMETERS ESTABLISHED BY THE STANDARDS.
    21     "RENOVATION."  THE REHABILITATION OF AN EXISTING BUILDING TO
    22  REASONABLY PLACE IT IN ITS ORIGINAL STRUCTURAL CONDITION AND
    23  WHICH REQUIRES MORE THAN 25% OF THE GROSS FLOOR AREA OR VOLUME
    24  OF THE ENTIRE BUILDING TO BE REBUILT.
    25                             CHAPTER 2
    26                   ENERGY CONSERVATION STANDARDS
    27  SECTION 201.  PROVISIONS.
    28     THE FOLLOWING PROVISIONS REGULATE THE DESIGN AND CONSTRUCTION
    29  OF THE EXTERIOR ENVELOPES AND SELECTION OF HVAC, SERVICE WATER
    30  HEATING, ELECTRICAL DISTRIBUTION, AND ILLUMINATION SYSTEMS AND
    19770H0552B1775                 - 14 -

     1  EQUIPMENT REQUIRED FOR THE PURPOSE OF EFFECTIVE USE OF ENERGY
     2  AND SHALL GOVERN THE CONSTRUCTION OF ALL BUILDINGS, OR PORTIONS
     3  THEREOF, AS PROVIDED HEREIN.
     4                            SUBCHAPTER A
     5                      PLANS AND SPECIFICATIONS
     6  SECTION 202.  SUBMISSION.
     7     PLANS, SPECIFICATIONS AND NECESSARY COMPUTATIONS TOGETHER
     8  WITH THE NECESSARY CERTIFICATION REQUIRED BY SECTION 305 SHALL
     9  BE SUBMITTED TO INDICATE CONFORMANCE WITH THIS CHAPTER AND OTHER
    10  APPLICABLE CHAPTERS OF THIS ACT.
    11  SECTION 203.  CONTENTS.
    12     THE PLANS AND SPECIFICATIONS SHALL SHOW IN SUFFICIENT DETAIL
    13  ALL PERTINENT DATA AND FEATURES OF THE BUILDING AND THE
    14  EQUIPMENT AND SYSTEMS AS HEREIN GOVERNED, INCLUDING BUT NOT
    15  LIMITED TO: EXTERIOR ENVELOPE COMPONENT MATERIALS, U VALUES OF
    16  ELEMENTS, R VALUES OF INSULATING MATERIALS, SIZE AND TYPE OF
    17  APPARATUS AND EQUIPMENT, EQUIPMENT AND SYSTEM CONTROLS AND OTHER
    18  PERTINENT DATA TO INDICATE CONFORMANCE WITH THE REQUIREMENTS
    19  HEREIN.
    20                            SUBCHAPTER B
    21                      DEFINITIONS RELATING TO
    22                   ENERGY CONSERVATION STANDARDS
    23  SECTION 204.  DEFINITIONS RELATING TO STANDARDS.
    24     THE FOLLOWING WORDS AND PHRASES WHEN USED IN THIS CHAPTER
    25  SHALL HAVE, UNLESS THE CONTEXT CLEARLY INDICATES OTHERWISE, THE
    26  MEANINGS GIVEN TO THEM IN THIS SECTION:
    27     "COEFFICIENT OF BEAM UTILIZATION" (CBU).  THE RATIO OF THE
    28  LUMINOUS FLUX (LUMENS) REACHING A SPECIFIED AREA DIRECTLY FROM A
    29  FLOODLIGHT OR PROJECTOR TO THE TOTAL BEAM LUMINOUS FLUX.
    30     "COEFFICIENT OF PERFORMANCE" (COP) - COOLING:  THE RATIO OF
    19770H0552B1775                 - 15 -

     1  THE RATE OF NET HEAT REMOVAL TO THE RATE OF TOTAL ENERGY INPUT,
     2  EXPRESSED IN CONSISTENT UNITS AND UNDER DESIGNATED RATING
     3  CONDITIONS.
     4     "COEFFICIENT OF PERFORMANCE" (COP) - HEAT PUMP, HEATING:  THE
     5  RATIO OF THE RATE OF NET HEAT OUTPUT TO THE RATE OF TOTAL ENERGY
     6  INPUT, EXPRESSED IN CONSISTENT UNITS AND UNDER DESIGNATED RATING
     7  CONDITIONS.
     8     THE RATE OF NET HEAT OUTPUT SHALL BE DEFINED AS THE CHANGE IN
     9  THE TOTAL HEAT CONTENTS OF THE AIR ENTERING AND LEAVING THE
    10  EQUIPMENT NOT INCLUDING SUPPLEMENTARY HEAT.
    11     TOTAL ENERGY INPUT SHALL BE DETERMINED BY COMBINING THE
    12  ENERGY INPUTS TO ALL ELEMENTS, EXCEPT SUPPLEMENTARY HEATERS, OF
    13  THE HEAT PUMP, INCLUDING, BUT NOT LIMITED TO, COMPRESSORS,
    14  PUMPS, SUPPLY AIR FANS, RETURN AIR FANS, OUTDOOR AIR FANS,
    15  COOLING TOWER FANS AND THE HEATING, VENTILATING AND AIR
    16  CONDITIONING SYSTEM EQUIPMENT CONTROL CIRCUIT.
    17     "COEFFICIENT OF UTILIZATION" (CU).  THE RATIO OF THE LUMINOUS
    18  FLUX (LUMENS) FROM A LUMINAIRE RECEIVED ON THE WORK PLANE TO THE
    19  LUMENS EMITTED BY THE LUMINAIRE'S LAMPS ALONE.
    20     "COLOR RENDITION."  GENERAL EXPRESSION FOR THE EFFECT OF A
    21  LIGHT SOURCE ON THE COLOR. APPEARANCE OF OBJECTS IN CONSCIOUS OR
    22  SUBCONSCIOUS COMPARISON WITH THEIR COLOR APPEARANCE UNDER A
    23  REFERENCE LIGHT SOURCE.
    24     "DEGREE DAY, HEATING."  A UNIT, BASED UPON TEMPERATURE
    25  DIFFERENCE AND TIME, USED IN ESTIMATING FUEL CONSUMPTION AND
    26  SPECIFYING NOMINAL HEATING LOAD OF A BUILDING IN WINTER. FOR ANY
    27  ONE DAY, WHEN THE MEAN TEMPERATURE IS LESS THAN 65 F., THERE
    28  EXISTS AS MANY DEGREE DAYS AS THERE ARE FAHRENHEIT DEGREES
    29  DIFFERENCE IN TEMPERATURE BETWEEN THE MEAN TEMPERATURE FOR THE
    30  DAY AND 65 F.
    19770H0552B1775                 - 16 -

     1     "ENERGY EFFICIENCY RATIO" (EER).  THE RATIO OF NET COOLING
     2  CAPACITY IN BTUH TO TOTAL RATE OF ELECTRIC INPUT IN WATTS UNDER
     3  DESIGNATED OPERATING CONDITIONS.
     4     "EQUIVALENT SPHERE ILLUMINATION" (ESI).  THE LEVEL OF SPHERE
     5  ILLUMINATION WHICH WOULD PRODUCE TASK VISIBILITY EQUIVALENT TO
     6  THAT PRODUCED BY A SPECIFIC LIGHTING ENVIRONMENT.
     7     "EXTERIOR ENVELOPE."  THE ELEMENTS OF A BUILDING WHICH
     8  ENCLOSE CONDITIONED SPACES THROUGH WHICH THERMAL ENERGY MAY BE
     9  TRANSFERRED TO OR FROM THE EXTERIOR.
    10     "FLOODLIGHTING."  A LIGHTING SYSTEM DESIGNATED TO LIGHT AN
    11  AREA USING PROJECTOR TYPE LUMINAIRES USUALLY CAPABLE OF BEING
    12  POINTED IN ANY DIRECTION.
    13     "FLOOD AREA, GROSS."  GROSS FLOOR AREA SHALL BE THE FLOOR
    14  AREA WITHIN THE PERIMETER OF THE OUTSIDE WALLS OF THE BUILDING
    15  UNDER CONSIDERATION, WITHOUT DEDUCTION FOR HALLWAYS, STAIRS,
    16  CLOSETS, THICKNESS OF WALLS, COLUMNS OR OTHER FEATURES.
    17     "ILLUMINATION."  THE DENSITY OF THE LUMINOUS FLUX INCIDENT ON
    18  A SURFACE, IT IS THE QUOTIENT OF THE LUMINOUS FLUX BY THE AREA
    19  OF THE SURFACE WHEN THE LATTER IS UNIFORMLY ILLUMINATED.
    20     "LIGHT LOSS FACTOR" (LLF).  A FACTOR USED IN CALCULATING THE
    21  LEVEL OF ILLUMINATION AFTER A GIVEN PERIOD OF TIME AND UNDER
    22  GIVEN CONDITIONS. IT TAKES INTO ACCOUNT TEMPERATURE AND VOLTAGE
    23  VARIATIONS, DIRT ACCUMULATION ON LUMINAIRE AND ROOM SURFACES,
    24  LAMP DEPRECIATION, MAINTENANCE PROCEDURES AND ATMOSPHERE
    25  CONDITIONS.
    26     "LUMINAIRE."  A COMPLETE LIGHTING UNIT CONSISTING OF A LAMP
    27  OR LAMPS TOGETHER WITH THE PARTS DESIGNED TO DISTRIBUTE THE
    28  LIGHT, TO POSITION AND PROTECT THE LAMPS AND TO CONNECT THE
    29  LAMPS TO THE POWER SUPPLY.
    30     "PACKAGED TERMINAL AIR CONDITIONER."  A FACTORY SELECTED
    19770H0552B1775                 - 17 -

     1  COMBINATION OF HEATING AND COOLING COMPONENTS, ASSEMBLIES OR
     2  SECTIONS, INTENDED TO SERVE A ROOM OR ZONE.
     3     "POWER."  IN CONNECTION WITH MACHINES, POWER IS THE TIME RATE
     4  OF DOING WORK. IN CONNECTION WITH THE TRANSMISSION OF ENERGY OF
     5  ALL TYPES, POWER REFERS TO THE RATE AT WHICH ENERGY IS
     6  TRANSMITTED; IN CUSTOMARY UNITS, IT IS MEASURED IN WATTS (W) OR
     7  BRITISH THERMAL UNITS PER HOUR (BTUH) AND IN SI UNITS IS
     8  MEASURED IN WATTS (W).
     9     "REFLECTANCE."  THE RATIO OF THE LIGHT REFLECTED BY A SURFACE
    10  TO THE LIGHT FALLING UPON IT.
    11     "REHEAT."  THE APPLICATION OF SENSIBLE HEAT TO SUPPLY AIR
    12  THAT HAS BEEN PREVIOUSLY COOLED BELOW THE TEMPERATURE OF THE
    13  CONDITIONED SPACE BY EITHER MECHANICAL REFRIGERATION OR THE
    14  INTRODUCTION OF OUTDOOR AIR TO PROVIDE COOLING.
    15     "RESIDENTIAL BUILDINGS."  ALL BUILDINGS AND STRUCTURES OR
    16  PARTS THEREOF SHALL BE CLASSIFIED IN THE RESIDENTIAL (R) USE
    17  GROUP IN WHICH FAMILIES OR HOUSEHOLDS LIVE, OR IN WHICH SLEEPING
    18  ACCOMMODATIONS ARE PROVIDED FOR INDIVIDUALS WITH OR WITHOUT
    19  DINING FACILITIES, EXCLUDING THOSE THAT ARE CLASSIFIED AS
    20  INSTITUTIONAL BUILDINGS.
    21     USE GROUP R-1 STRUCTURES.  THIS USE GROUP SHALL INCLUDE ALL
    22  HOTEL AND MOTEL BUILDINGS, LODGING HOUSES, BOARDING HOUSES AND
    23  DORMITORY BUILDINGS ARRANGED FOR THE SHELTER AND SLEEPING
    24  ACCOMMODATION OF MORE THAN 20 INDIVIDUALS.
    25     USE GROUP R-2 STRUCTURES.  THIS USE GROUP SHALL INCLUDE ALL
    26  MULTIPLE-FAMILY DWELLINGS HAVING MORE THAN TWO DWELLING UNITS;
    27  AND SHALL ALSO INCLUDE ALL DORMITORIES, BOARDING AND LODGING
    28  HOUSES ARRANGED FOR SHELTER AND SLEEPING ACCOMMODATION BY MORE
    29  THAN FIVE AND NOT MORE THAN 20 INDIVIDUALS.
    30     USE GROUP R-3 STRUCTURES.  THIS USE GROUP SHALL INCLUDE ALL
    19770H0552B1775                 - 18 -

     1  BUILDINGS ARRANGED FOR THE USE OF ONE OR TWO FAMILY DWELLING
     2  UNITS INCLUDING NOT MORE THAN FIVE LODGERS OR BOARDERS PER
     3  FAMILY.
     4     "RESISTANCE, THERMAL" (R).  A MEASURE OF THE ABILITY TO
     5  RETARD THE FLOW OF HEAT. THE R VALUE IS THE RECIPROCAL OF A HEAT
     6  TRANSFER COEFFICIENT, AS EXPRESSED BY U.  R = 1/U.
     7     "THERMAL TRANSMITTANCE" (U).  OVERALL COEFFICIENT OF HEAT
     8  TRANSMISSION OR THERMAL TRANSMITTANCE (AIR TO AIR) EXPRESSED IN
     9  UNITS OF BTU PER HOUR PER SQUARE FOOT PER DEGREE F.  IT IS THE
    10  TIME RATE OF HEAT FLOW. THE U VALUE APPLIES TO COMBINATIONS OF
    11  DIFFERENT MATERIALS USED IN SERIES ALONG THE HEAT FLOW PATH AND
    12  ALSO TO SINGLE MATERIALS THAT COMPRISE A BUILDING SECTION AND
    13  INCLUDE CAVITY AIR SPACES AND SURFACE AIR FILMS ON BOTH SIDES.
    14     "THERMAL TRANSMITTANCE" (UO).  OVERALL (AVERAGE) HEAT
    15  TRANSMISSION OR THERMAL TRANSMITTANCE OF A GROSS AREA OF THE
    16  EXTERIOR BUILDING ENVELOPE, EXPRESSED IN UNITS OF BTU PER HOUR
    17  PER SQUARE FOOT PER DEGREE F.
    18     THE UO VALUE APPLIES TO THE COMBINED EFFECT OF THE TIME RATE
    19  OF HEAT FLOWS THROUGH THE VARIOUS PARALLEL PATHS, SUCH AS
    20  WINDOWS, DOORS AND OPAQUE CONSTRUCTION AREAS, COMPRISING THE
    21  GROSS AREA OF ONE OR MORE EXTERIOR BUILDING COMPONENTS, SUCH AS
    22  WALLS, FLOOR OR ROOF/CEILING.
    23     "THERMOSTAT."  AN INSTRUMENT WHICH MEASURES CHANGES IN
    24  TEMPERATURE AND CONTROLS DEVICES FOR MAINTAINING A DESIRED
    25  TEMPERATURE.
    26     "VEILING REFLECTIONS."  REGULAR REFLECTIONS SUPERIMPOSED UPON
    27  DIFFUSE REFLECTIONS FROM AN OBJECT THAT PARTIALLY OR TOTALLY
    28  OBSCURE THE DETAILS TO BE SEEN BY REDUCING THE CONTRAST. THIS
    29  SOMETIMES IS CALLED "REFLECTED GLARE."
    30     "WORK PLANE."  THE PLANE AT WHICH WORK USUALLY IS DONE AND AT
    19770H0552B1775                 - 19 -

     1  WHICH THE ILLUMINATION IS SPECIFIED AND MEASURED. UNLESS
     2  OTHERWISE INDICATED, THIS IS ASSUMED TO BE A HORIZONTAL PLANE 30
     3  IN. (0.76 M) ABOVE THE FLOOR.
     4     "ZONE."  A SPACE OR GROUP OF SPACES WITHIN A BUILDING WITH
     5  HEATING OR COOLING REQUIREMENTS SUFFICIENTLY SIMILAR SO THAT
     6  COMFORT CONDITIONS CAN BE MAINTAINED THROUGHOUT BY A SINGLE
     7  CONTROLLING DEVICE.
     8                            SUBCHAPTER C
     9                         BUILDING ENVELOPE
    10  SECTION 205.  GENERAL PROVISIONS.
    11     (A)  PURPOSE OF SUBCHAPTER.--THE INTENT OF THIS SUBCHAPTER IS
    12  TO PROVIDE MINIMUM REQUIREMENTS FOR EXTERIOR ENVELOPE
    13  CONSTRUCTION IN THE INTEREST OF ENERGY CONSERVATION.
    14     IN ADDITION TO THE CRITERIA SET FORTH IN THIS SUBCHAPTER THE
    15  PROPOSED DESIGN MAY TAKE INTO CONSIDERATION THE THERMAL MASS OF
    16  THE BUILDING IN CONSIDERING ENERGY CONSERVATION.
    17     (B)  THERMAL PERFORMANCE.--ALL BUILDINGS AND STRUCTURES THAT
    18  ARE HEATED OR MECHANICALLY COOLED SHALL BE CONSTRUCTED SO AS TO
    19  PROVIDE THE REQUIRED THERMAL PERFORMANCE OF THE VARIOUS
    20  COMPONENTS.
    21     THE REQUIRED THERMAL TRANSMITTANCE VALUE (UO) OF ANY ONE
    22  COMPONENT, SUCH AS ROOF/CEILING, WALL OR FLOOR MAY BE INCREASED
    23  AND THE UO VALUE FOR OTHER COMPONENTS DECREASED PROVIDED THAT
    24  THE OVERALL HEAT GAIN OR LOSS FOR THE ENTIRE BUILDING ENVELOPE
    25  DOES NOT EXCEED THE TOTAL RESULTING FROM CONFORMANCE TO THE
    26  REQUIRED UO VALUES.
    27     (C)  DIFFERENT REQUIREMENTS.--A BUILDING THAT IS DESIGNED TO
    28  BE BOTH HEATED AND COOLED SHALL MEET THE MORE STRINGENT OF THE
    29  HEATING OR COOLING REQUIREMENTS OF THE EXTERIOR ENVELOPE AS
    30  PROVIDED IN THIS SUBCHAPTER WHEN REQUIREMENTS DIFFER.
    19770H0552B1775                 - 20 -

     1     (D)  EXTERIOR WALLS.--FOR THE PURPOSE OF THIS SUBCHAPTER THE
     2  GROSS AREA OF EXTERIOR WALLS CONSISTS OF ALL OPAQUE WALL AREAS,
     3  INCLUDING FOUNDATION WALLS ABOVE GRADE, PERIPHERAL EDGES OF
     4  FLOORS, WINDOW AREAS INCLUDING SASH, AND DOOR AREAS, WHERE SUCH
     5  SURFACES ARE EXPOSED TO OUTDOOR AIR AND ENCLOSE A HEATED OR
     6  MECHANICALLY COOLED SPACE.
     7     (E)  ROOF ASSEMBLY.--FOR THE PURPOSE OF THIS SUBCHAPTER A
     8  ROOF ASSEMBLY SHALL BE CONSIDERED AS ALL COMPONENTS OF THE
     9  ROOF/CEILING ENVELOPE THROUGH WHICH HEAT FLOWS, THEREBY CREATING
    10  A BUILDING TRANSMISSION HEAT LOSS OR GAIN, WHERE SUCH ASSEMBLY
    11  IS EXPOSED TO OUTDOOR AIR AND ENCLOSES A HEATED OR MECHANICALLY
    12  COOLED SPACE.
    13     THE GROSS AREA OF A ROOF ASSEMBLY CONSISTS OF THE TOTAL
    14  INTERIOR SURFACE OF SUCH ASSEMBLY, INCLUDING SKYLIGHTS, EXPOSED
    15  TO THE HEATED OR MECHANICALLY COOLED SPACE.
    16     WHERE AIR CEILING PLENUMS ARE EMPLOYED, THE ROOF OR CEILING
    17  ASSEMBLY SHALL:
    18         (1)  FOR THERMAL TRANSMITTANCE PURPOSES NOT INCLUDE THE
    19     CEILING PROPER NOR THE PLENUM SPACE AS PART OF THE ASSEMBLY.
    20         (2)  FOR GROSS AREA PURPOSES BE BASED UPON THE INTERIOR
    21     FACE OF THE UPPER PLENUM SURFACE.
    22  SECTION 206.  CRITERIA FOR RESIDENTIAL BUILDINGS.
    23     (A)  APPLICABILITY.--THE REQUIREMENTS HEREIN SHALL APPLY TO
    24  ALL BUILDINGS AND STRUCTURES OR PORTIONS THEREOF OF USE GROUPS
    25  R-1, R-2 AND R-3 THAT ARE HEATED OR MECHANICALLY COOLED WHEN NOT
    26  MORE THAN 3 STORIES OR 40 FEET IN HEIGHT.
    27     (B)  WALLS.--THE GROSS AREA OF EXTERIOR WALLS ABOVE GRADE,
    28  INCLUDING FOUNDATION WALLS, SHALL HAVE A COMBINED THERMAL
    29  TRANSMITTANCE VALUE (UO) NOT EXCEEDING THOSE SPECIFIED IN TABLE
    30  1, WITH THE FOLLOWING EXCEPTIONS:
    19770H0552B1775                 - 21 -

     1         (1)  IN LOCATIONS WITH LESS THAN 500 HEATING DEGREE DAYS
     2     THERE SHALL NOT BE A MAXIMUM UO REQUIREMENT IF ONLY HEATING
     3     IS PROVIDED AND THE UO SHALL BE 0.30 MAXIMUM IF THE BUILDING
     4     IS MECHANICALLY COOLED.
     5         (2)  THE OPAQUE EXTERIOR WALL AREAS MAY BE CONSTRUCTED
     6     HAVING THERMAL TRANSMITTANCE (U) VALUES IN CONJUNCTION WITH
     7     GLAZED OPENING AREAS IN ACCORDANCE WITH TABLE 2.
     8                              TABLE 1
     9                 MAXIMUM ALLOWABLE "UO" VALUES FOR
    10                   GROSS EXTERIOR WALL ASSEMBLIES
    11                                       DETACHED         ALL OTHER
    12     ANNUAL HEATING DEGREE DAYS*   ONE & TWO FAMILY    RESIDENTIAL
    13                  500                    0.30             0.38
    14                 1000                    0.29             0.37
    15                 2000                    0.28             0.35
    16                 3000                    0.26             0.33
    17                 4000                    0.25             0.31
    18                 5000                    0.23             0.29
    19                 6000                    0.22             0.27
    20                 7000                    0.20             0.26
    21                 8000                    0.19             0.24
    22                 9000                    0.17             0.22
    23            10,000 OR MORE               0.16             0.20
    24     *AS SPECIFIED IN CHAPTER 43 ASHRAE HANDBOOK-SYSTEMS.
    25                              TABLE 2
    26       MAXIMUM ALLOWABLE "U" VALUES FOR ABOVE-GRADE EXTERIOR
    27         WALL SECTIONS AND CORRESPONDING MAXIMUM ALLOWABLE
    28                        GLAZED OPENING AREAS
    29                                     REQUIRED "U" OPAQUE WALLS
    30                                BTUH PER SQUARE FOOT PER DEGREE F.
    19770H0552B1775                 - 22 -

     1                                         (3 STORIES OR LESS)
     2         YEARLY      GLAZED                  USE GROUP R-3
     3     DEGREE DAYS    OPENINGS             PER CENT GLAZED OPENING
     4                                         10     15     20     25
     5     2500 OR LESS    SINGLE              .21    .15    .09    .03
     6                     DOUBLE              .26    .24    .21    .18
     7     2501 TO 4500    SINGLE              .17    .12    .06    .02
     8                     DOUBLE              .23    .20    .18    .14
     9     4501 TO 6000    SINGLE              .14    .08    .02    NP
    10                     DOUBLE              .19    .17    .14    .10
    11     6001 TO 8000    SINGLE              .12    .06    .01    NP
    12                     DOUBLE              .17    .14    .11    .08
    13     8001 TO 10,000  SINGLE              .09    .02    NP     NP
    14                     DOUBLE              .14    .11    .08    .04
    15    10,000 OR MORE   SINGLE              .05    NP     NP     NP
    16                     DOUBLE              .11    .07    .04    NP
    17         YEARLY      GLAZED               ALL OTHER RESIDENTIAL
    18     DEGREE DAYS    OPENINGS             PER CENT GLAZED OPENING
    19                                         15     20     25     30
    20     2500 OR LESS    SINGLE              .25    .19    .13    .07
    21                     DOUBLE              .33    .31    .29    .27
    22     2501 TO 4500    SINGLE              .20    .14    .08    .03
    23                     DOUBLE              .29    .26    .24    .21
    24     4501 TO 6000    SINGLE              .15    .09    .03    NP
    25                     DOUBLE              .24    .21    .18    .15
    26     6001 TO 8000    SINGLE              .13    .07    .01    NP
    27                     DOUBLE              .21    .19    .16    .13
    28     8001 TO 10,000  SINGLE              .08    .02    NP     NP
    29                     DOUBLE              .17    .14    .10    .06
    30    10,000 OR MORE   SINGLE              .04    NP     NP     NP
    19770H0552B1775                 - 23 -

     1                     DOUBLE              .12    .09    .05    NP
     2     NOTE 1.  NP - NOT PERMITTED.
     3     NOTE 2.  FOR GLAZED OPENING PERCENTAGES OTHER THAN THOSE
     4  SPECIFIED ABOVE, LINEAR INTERPOLATION MAY BE UTILIZED.
     5     NOTE 3.  FOR COMBINATIONS OF SINGLE AND DOUBLE GLAZING, THE
     6  "U" VALUES ABOVE MAY BE INTERPOLATED IN PROPORTION TO THE SINGLE
     7  AND DOUBLE GLAZED AREAS UTILIZED.
     8     NOTE 4.  TO OBTAIN CREDIT FOR TRIPLE GLAZING OR SUPERIOR
     9  QUALITY SASH, OR TO UTILIZE COMBINATIONS OF SINGLE AND DOUBLE
    10  GLAZING NOT PERMITTED BY THIS TABLE, USE TABLE 1.
    11     NOTE 5.  INTERPOLATION BETWEEN GIVEN "U" VALUES AND BETWEEN
    12  DEGREES DAYS IS NOT PERMITTED.
    13     (C)  ROOF/CEILING.--THE ROOF/CEILING ASSEMBLIES SHALL HAVE A
    14  COMBINED THERMAL TRANSMITTANCE VALUE (UO) OR SHALL BE PROVIDED
    15  WITH THERMAL INSULATION HAVING AN "R" VALUE AS SPECIFIED IN
    16  TABLE 3 WITH THE FOLLOWING EXCEPTION:
    17     ROOF/CEILING ASSEMBLIES IN WHICH THE FINISHED INTERIOR
    18  SURFACE IS ESSENTIALLY THE UNDERSIDE OF THE ROOF DECK, SUCH AS A
    19  WOODEN CATHEDRAL CEILING, MAY HAVE A "UO" VALUE NOT TO EXCEED
    20  0.08 BTU PER HOUR PER SQUARE FOOT PER DEGREE F. FOR ANY HEATING
    21  DEGREE DAY AREA.
    22                              TABLE 3
    23           MAXIMUM ALLOWABLE "UO" VALUES AND ALTERNATIVE
    24          MINIMUM ALLOWABLE "R" VALUES OF ADDED INSULATION
    25                    FOR ROOF/CEILING ASSEMBLIES
    26     ANNUAL HEATING DEGREE DAYS      MAXIMUM "UO"    MINIMUM "R"
    27             8000 OR LESS                0.05            19
    28             MORE THAN 8000              0.04            22
    29     NOTE 1.  THESE VALUES PRESUME NO SIGNIFICANT THERMAL
    30  TRANSMISSION THROUGH FRAMING MEMBERS, SKYLIGHTS OR OTHER
    19770H0552B1775                 - 24 -

     1  INTERRUPTIONS IN THE ROOF ENVELOPE. IF SUCH INTERRUPTIONS OCCUR,
     2  CALCULATIONS MUST BE MADE SHOWING CONFORMANCE TO THE REQUIRED
     3  "UO" VALUES.
     4     (D)  FLOORS OVER UNHEATED SPACES.--THE FLOOR OF A HEATED OR
     5  MECHANICALLY COOLED SPACE LOCATED OVER AN UNHEATED SPACE SHALL
     6  HAVE A COMBINED THERMAL TRANSMITTANCE VALUE (UO) OR SHALL BE
     7  PROVIDED WITH THERMAL INSULATION HAVING AN "R" VALUE AS
     8  SPECIFIED IN TABLE 4.
     9                              TABLE 4
    10           MAXIMUM ALLOWABLE "UO" VALUES AND ALTERNATIVE
    11          MINIMUM ALLOWABLE "R" VALUES OF ADDED INSULATION
    12                  FOR FLOORS OVER UNHEATED SPACES
    13     ANNUAL HEATING DEGREE DAYS      MAXIMUM "UO"    MINIMUM "R"
    14              500*                       0.36            --
    15             1000                        0.32            --
    16             2000                        0.25            4
    17             3000                        0.18            6
    18             4000                        0.11            9
    19             4500 OR MORE                0.08           11
    20     *TABLE VALUES MAY BE INTERPOLATED.
    21     (E)  SLAB-ON GRADE FLOORS.--
    22         (1)  FOR SLAB-ON GRADE FLOORS, THE PERIMETER OF THE FLOOR
    23     SHALL BE INSULATED WITH A MATERIAL HAVING A THERMAL
    24     RESISTANCE VALUE (R) NOT LESS THAN THOSE SPECIFIED IN TABLE
    25     5.
    26                              TABLE 5
    27             MINIMUM ALLOWABLE "R" VALUES OF PERIMETER
    28                INSULATION FOR SLAB-ON GRADE FLOORS
    29     ANNUAL HEATING DEGREE DAYS      HEATED SLAB     UNHEATED SLAB
    30                  500*                   2.9             --
    19770H0552B1775                 - 25 -

     1                 1000                    3.3             --
     2                 2000                    4.0             --
     3                 3000                    4.8             2.8
     4                 4000                    5.5             3.5
     5                 5000                    6.3             4.2
     6                 6000                    7.0             4.9
     7                 7000                    7.8             5.5
     8                 8000                    8.5             6.2
     9                 9000                    9.3             6.8
    10         10,000 OR MORE                 10.0             7.5
    11     *TABLE VALUES MAY BE INTERPOLATED.
    12         (2)  THE INSULATION SHALL EXTEND DOWNWARD FROM THE TOP OF
    13     THE SLAB FOR A MINIMUM DISTANCE OF 24 INCHES OR DOWNWARD TO
    14     THE BOTTOM OF THE SLAB THEN HORIZONTALLY BENEATH THE SLAB FOR
    15     A MINIMUM TOTAL DISTANCE OF 24 INCHES.
    16  SECTION 207.  OTHER BUILDINGS.
    17     (A)  COVERAGE.--THE HEATING AND COOLING REQUIREMENTS HEREIN
    18  SHALL GOVERN ALL BUILDINGS AND STRUCTURES OR PORTIONS THEREOF
    19  OTHER THAN DEFINED BY SECTION 206.
    20     (B)  HEATING CRITERIA FOR WALLS.--ALL BUILDINGS AND
    21  STRUCTURES THAT ARE HEATED SHALL HAVE A COMBINED THERMAL
    22  TRANSMITTANCE VALUE (UO) FOR THE GROSS AREA OF EXTERIOR WALLS
    23  NOT EXCEEDING THOSE SPECIFIED IN TABLE 6.
    24                              TABLE 6
    25                   MAXIMUM ALLOWABLE "UO" VALUES
    26                 FOR GROSS EXTERIOR WALL ASSEMBLIES
    27                                     3 STORIES OR    MORE THAN
    28     ANNUAL HEATING DEGREE DAYS     40 FT. OR LESS  3 STORIES OR
    29                                                       40 FT.
    30                  500                    0.38            0.47
    19770H0552B1775                 - 26 -

     1                 1000                    0.37            0.46
     2                 2000                    0.35            0.43
     3                 3000                    0.33            0.41
     4                 4000                    0.31            0.38
     5                 5000                    0.29            0.36
     6                 6000                    0.27            0.33
     7                 7000                    0.26            0.31
     8                 8000                    0.24            0.28
     9                 9000                    0.22            0.28
    10            10,000 OR MORE               0.20            0.28
    11     (C)  HEATING CRITERIA FOR ROOF/CEILING.--ALL BUILDINGS AND
    12  STRUCTURES THAT ARE HEATED SHALL HAVE COMBINED THERMAL
    13  TRANSMITTANCE VALUE (UO) FOR ROOF/CEILING ASSEMBLIES NOT
    14  EXCEEDING THOSE SPECIFIED IN TABLE 7.
    15                              TABLE 7
    16                   MAXIMUM ALLOWABLE "UO" VALUES
    17                    FOR ROOF/CEILING ASSEMBLIES
    18     ANNUAL HEATING DEGREE DAYS              MAXIMUM UO
    19             3000 AND LESS*                     0.10
    20             4000                               0.092
    21             5000                               0.084
    22             6000                               0.076
    23             7000                               0.068
    24             8000 AND MORE                      0.06
    25     *TABLE VALUES MAY BE INTERPOLATED.
    26     (D)  HEATING CRITERIA FOR FLOORS OVER UNHEATED SPACES.--THE
    27  FLOOR OF A HEATED SPACE LOCATED OVER AN UNHEATED SPACE SHALL
    28  HAVE A THERMAL TRANSMITTANCE VALUE (UO) NOT EXCEEDING THOSE
    29  SPECIFIED IN TABLE 8.
    30                              TABLE 8
    19770H0552B1775                 - 27 -

     1                 MAXIMUM ALLOWABLE "UO" VALUES FOR
     2               FLOOR ASSEMBLIES OVER UNHEATED SPACES
     3     ANNUAL HEATING DEGREE DAYS              MAXIMUM UO
     4                  500*                           0.36
     5                 1000                            0.32
     6                 2000                            0.25
     7                 3000                            0.18
     8                 4000                            0.11
     9                 4500 OR MORE                    0.08
    10     *TABLE VALUES MAY BE INTERPOLATED.
    11     (E)  HEATING CRITERIA FOR SLAB-ON GRADE FLOORS.--FOR SLAB-ON
    12  GRADE FLOORS, THE PERIMETER OF THE FLOOR SHALL BE INSULATED WITH
    13  A MATERIAL HAVING A THERMAL RESISTANCE VALUE (R) NOT LESS THAN
    14  THOSE SPECIFIED IN TABLE 9.
    15     THE INSULATION SHALL EXTEND DOWNWARD FROM THE TOP OF THE SLAB
    16  FOR A MINIMUM DISTANCE OF 24 INCHES OR DOWNWARD TO THE BOTTOM OF
    17  THE SLAB THEN HORIZONTALLY BENEATH THE SLAB FOR A MINIMUM TOTAL
    18  DISTANCE OF 24 INCHES.
    19                              TABLE 9
    20             MINIMUM ALLOWABLE "R" VALUES OF PERIMETER
    21                INSULATION FOR SLAB-ON GRADE FLOORS
    22     ANNUAL HEATING DEGREE DAYS      HEATED SLAB    UNHEATED SLAB
    23                  500*                   2.9             --
    24                 1000                    3.3             --
    25                 2000                    4.0             --
    26                 3000                    4.8             2.8
    27                 4000                    5.5             3.5
    28                 5000                    6.3             4.2
    29                 6000                    7.0             4.9
    30                 7000                    7.8             5.5
    19770H0552B1775                 - 28 -

     1                 8000                    8.5             6.2
     2                 9000                    9.3             6.8
     3            10,000 OR MORE              10.0             7.5
     4     *TABLE VALUES MAY BE INTERPOLATED.
     5     (F)  COOLING CRITERIA FOR WALLS.--ALL BUILDINGS AND
     6  STRUCTURES THAT ARE MECHANICALLY COOLED SHALL HAVE AN OVERALL
     7  THERMAL TRANSFER VALUE FOR THE GROSS AREA OF EXTERIOR WALLS NOT
     8  EXCEEDING THOSE SPECIFIED IN TABLE 10.
     9                              TABLE 10
    10              MAXIMUM OVERALL THERMAL TRANSFER VALUES
    11                      FOR GROSS EXTERIOR WALLS
    12                                 MAXIMUM OVERALL THERMAL TRANSFER
    13     DEGREES NORTH LATITUDE        VALUE BTUH PER SQUARE FOOT
    14             24                              29.0
    15             32                              31.3
    16             40                              33.5
    17             48                              35.7
    18             56                              38.0
    19     (G)  COOLING CRITERIA FOR ROOF/CEILINGS.--ALL BUILDINGS AND
    20  STRUCTURES THAT ARE MECHANICALLY COOLED SHALL HAVE A COMBINED
    21  THERMAL TRANSMITTANCE VALUE (UO) FOR ROOF/CEILING ASSEMBLIES THE
    22  SAME AS SPECIFIED IN TABLE 7 FOR HEATING.
    23  SECTION 208.  AIR LEAKAGE.
    24     (A)  APPLICATION.--THE REQUIREMENTS OF THIS SECTION SHALL
    25  APPLY TO ALL BUILDINGS AND STRUCTURES AND APPLY ONLY TO THOSE
    26  LOCATIONS SEPARATING OUTDOOR AMBIENT CONDITIONS FROM INTERIOR
    27  SPACES THAT ARE HEATED OR MECHANICALLY COOLED AND ARE NOT
    28  APPLICABLE TO SEPARATION OF INTERIOR SPACES FROM EACH OTHER.
    29     (B)  STANDARD.--COMPLIANCE WITH THE CRITERIA FOR AIR LEAKAGE
    30  SHALL BE DETERMINED BY ASTM E-283, STANDARDS METHOD TEST FOR
    19770H0552B1775                 - 29 -

     1  RATE OF AIR LEAKAGE THROUGH EXTERIOR WINDOWS, CURTAIN WALLS AND
     2  DOORS, AT A PRESSURE DIFFERENTIAL OF 1.567 LB/FT2 WHICH IS
     3  EQUIVALENT TO THE EFFECT OF A 25 M.P.H. WIND.
     4     (C)  ACCEPTANCE CRITERIA.--THE FOLLOWING CRITERIA SHALL
     5  REPRESENT THE MAXIMUM ALLOWABLE AIR LEAKAGE:
     6         (1)  THE AIR INFILTRATION RATE FOR WINDOWS SHALL NOT
     7     EXCEED 0.5 CFM PER FOOT OF SASH CRACK.
     8         (2)  THE AIR INFILTRATION RATE FOR SLIDING GLASS DOORS IN
     9     RESIDENTIAL BUILDINGS SHALL NOT EXCEED 0.5 CFM PER SQUARE
    10     FOOT OF DOOR AREA.
    11         (3)  THE AIR INFILTRATION RATE FOR SWINGING DOORS IN
    12     RESIDENTIAL BUILDINGS SHALL NOT EXCEED 1.25 CFM PER SQUARE
    13     FOOT OF DOOR AREA.
    14         (4)  THE AIR INFILTRATION RATE FOR SWINGING, REVOLVING OR
    15     SLIDING DOORS IN OTHER THAN RESIDENTIAL BUILDINGS SHALL NOT
    16     EXCEED 11 CFM PER LINEAL FOOT OF DOOR CRACK.
    17     (D)  CAULKING AND SEALANTS.--EXTERIOR JOINTS AROUND WINDOWS
    18  AND DOOR FRAMES, BETWEEN WALL CAVITIES AND WINDOW OR DOOR
    19  FRAMES, BETWEEN WALL AND FOUNDATION, BETWEEN WALL AND ROOF,
    20  BETWEEN WALL PANELS, AT PENETRATIONS OR UTILITY SERVICES THROUGH
    21  WALLS, FLOORS AND ROOFS, AND ALL OTHER OPENINGS IN THE EXTERIOR
    22  ENVELOPE SHALL BE CAULKED, GASKETED, WEATHERSTRIPPED, OR
    23  OTHERWISE SEALED.
    24                            SUBCHAPTER D
    25         WARM AIR HEATING, VENTILATING AND AIR CONDITIONING
    26                       SYSTEMS AND EQUIPMENT
    27  SECTION 209.  GENERAL PROVISIONS.
    28     THIS SUBCHAPTER APPLIES TO AIR DUCT SYSTEMS EMPLOYING
    29  MECHANICAL MEANS FOR THE MOVEMENT OF AIR USED FOR WARM AIR
    30  HEATING, VENTILATING, AIR CONDITIONING SYSTEMS, EXHAUST SYSTEMS
    19770H0552B1775                 - 30 -

     1  AND COMBINATION HEATING AND AIR CONDITIONING SYSTEMS, EXCEPT
     2  THAT THIS SUBCHAPTER SHALL NOT APPLY TO SYSTEMS FOR THE REMOVAL
     3  OF FLAMMABLE VAPORS OR RESIDUES OR TO SYSTEMS FOR CONVEYING
     4  DUST, STOCK OR REFUSE BY MEANS OF AIR CURRENTS. HEATING,
     5  VENTILATING AND AIR CONDITIONING SYSTEMS OF ALL BUILDINGS AND
     6  STRUCTURES OR PORTIONS THEREOF SHALL BE DESIGNED AND INSTALLED
     7  FOR EFFICIENT USE OF ENERGY AS HEREIN PROVIDED. FOR SPECIAL
     8  APPLICATIONS SUCH AS HOSPITALS, LABORATORIES, THERMALLY
     9  SENSITIVE EQUIPMENT, COMPUTER ROOMS, AND MANUFACTURING
    10  PROCESSES, THE DESIGN CONCEPTS AND PARAMETERS SHALL CONFORM TO
    11  THE REQUIREMENTS OF THE APPLICATION AT MINIMUM ENERGY LEVELS.
    12  SECTION 210.  DESIGN REQUIREMENTS.
    13     IN DETERMINING DESIGN CONDITIONS FOR CALCULATIONS UNDER THIS
    14  SECTION THE FOLLOWING DESIGN TEMPERATURES SHALL APPLY:
    15         (1)  OUTDOOR DESIGN TEMPERATURE SHALL BE SELECTED FOR
    16     LISTED LOCATIONS IN CHAPTER 33 OF THE ASHRAE HANDBOOK OF
    17     FUNDAMENTALS, FROM COLUMNS OF 97 1/2% VALUES FOR HEATING AND
    18     2 1/2% VALUES FOR COOLING.
    19         (2)  INDOOR DESIGN TEMPERATURE SHALL BE 70 DEGREES F. FOR
    20     HEATING AND 78 DEGREES F. FOR COOLING.
    21         (3)  INDOOR DESIGN RELATIVE HUMIDITY FOR HEATING SHALL
    22     NOT EXCEED 30%. FOR COOLING THE ACTUAL DESIGN RELATIVE
    23     HUMIDITY WITHIN THE COMFORT ENVELOPE AS DEFINED IN ASHRAE
    24     STANDARD 55-74 "THERMAL ENVIRONMENTAL CONDITIONS FOR HUMAN
    25     OCCUPANCY" SHALL BE SELECTED FOR THE MINIMUM TOTAL HEATING,
    26     VENTILATING, AND AIR CONDITIONING SYSTEM ENERGY USE.
    27  SECTION 211.  COOLING WITH OUTDOOR AIR.
    28     (A)  FAN SYSTEM DESIGN.--EACH FAN SYSTEM SHALL BE DESIGNED TO
    29  USE UP TO AND INCLUDING 100% OF THE FAN SYSTEM CAPACITY FOR
    30  COOLING WITH OUTDOOR AIR AUTOMATICALLY WHENEVER ITS USE WILL
    19770H0552B1775                 - 31 -

     1  RESULT IN LOWER USAGE OF ENERGY THAN WOULD BE REQUIRED UNDER ITS
     2  NORMAL OPERATION.
     3     (B)  EXCEPTIONS.--COOLING WITH OUTDOOR AIR IS NOT REQUIRED
     4  UNDER ANY ONE OR MORE OF THE FOLLOWING CONDITIONS:
     5         (1)  FAN SYSTEM CAPACITY LESS THAN 5,000 CFM OR 134,000
     6     BTU/HR TOTAL COOLING CAPACITY.
     7         (2)  THE QUALITY OF THE OUTDOOR AIR IS SO POOR AS TO
     8     REQUIRE EXTENSIVE TREATMENT OF THE AIR.
     9         (3)  THE NEED FOR HUMIDIFICATION OR DEHUMIDIFICATION
    10     REQUIRES THE USE OF MORE ENERGY THAN IS CONSERVED BY OUTDOOR
    11     AIR COOLING.
    12         (4)  THE USE OF OUTDOOR AIR COOLING MAY AFFECT THE
    13     OPERATION OF OTHER SYSTEMS (SUCH AS RETURN OR EXHAUST AIR
    14     FANS OR SUPERMARKET REFRIGERATION) SO AS TO INCREASE THE
    15     OVERALL ENERGY CONSUMPTION OF THE BUILDING.
    16         (5)  INTERNAL/EXTERNAL ZONE HEAT RECOVERY OR OTHER ENERGY
    17     RECOVERY IS USED.
    18         (6)  ANNUAL HEATING DEGREE DAYS ARE LESS THAN 2,500.
    19         (7)  WHEN ALL SPACE COOLING IS ACCOMPLISHED BY A
    20     CIRCULATING LIQUID WHICH TRANSFERS SPACE HEAT DIRECTLY OR
    21     INDIRECTLY TO A HEAT REJECTION DEVISE SUCH AS A COOLING TOWER
    22     WITHOUT THE USE OF A REFRIGERATION SYSTEM.
    23  SECTION 212.  MECHANICAL VENTILATION.
    24     EACH MECHANICAL VENTILATION SYSTEM SHALL BE EQUIPPED WITH A
    25  READILY ACCESSIBLE MEANS FOR EITHER SHUT-OFF OR VOLUME REDUCTION
    26  AND SHUT-OFF WHEN VENTILATION IS NOT REQUIRED.
    27  SECTION 213.  SIMULTANEOUS HEATING AND COOLING.
    28     SYSTEMS THAT EMPLOY BOTH HEATING AND COOLING SIMULTANEOUSLY
    29  IN ORDER TO ACHIEVE COMFORT CONDITIONS WITHIN A SPACE SHALL BE
    30  LIMITED TO THOSE SITUATIONS WHERE MORE EFFICIENT METHODS OF
    19770H0552B1775                 - 32 -

     1  HEATING AND AIR CONDITIONING CANNOT BE EFFECTIVELY UTILIZED TO
     2  MEET SYSTEM OBJECTIVES. SIMULTANEOUS HEATING AND COOLING BY
     3  REHEATING OR RECOOLING SUPPLY AIR OR BY CONCURRENT OPERATION OR
     4  INDEPENDENT HEATING AND COOLING SYSTEMS SERVING A COMMON ZONE
     5  SHALL BE RESTRICTED AS FOLLOWS:
     6         (1)  RECOVERED ENERGY, PROVIDED THE NEW ENERGY EXPENDED
     7     IN THE RECOVERY PROCESS IS LESS THAN THE AMOUNT RECOVERED,
     8     MAY BE USED FOR CONTROL OF TEMPERATURE AND HUMIDITY. NEW
     9     ENERGY IS DEFINED AS ENERGY, OTHER THAN RECOVERED, UTILIZED
    10     FOR THE PURPOSE OF HEATING OR COOLING.
    11         (2)  NEW ENERGY MAY BE USED, WHEN NECESSARY, TO PREVENT
    12     RELATIVE HUMIDITY FROM RISING ABOVE 60% FOR COMFORT CONTROL
    13     OR TO PREVENT CONDENSATION ON TERMINAL UNITS OR OUTLETS.
    14         (3)  NEW ENERGY MAY BE USED FOR CONTROL OF TEMPERATURE IF
    15     MINIMIZED AS SPECIFIED IN SECTIONS 214 THROUGH 218.
    16  SECTION 214.  REHEAT SYSTEMS.
    17     SYSTEMS EMPLOYING REHEAT AND SERVING MULTIPLE ZONES, OTHER
    18  THAN THOSE EMPLOYING VARIABLE AIR VOLUME FOR TEMPERATURE
    19  CONTROL, SHALL BE PROVIDED WITH CONTROL THAT WILL AUTOMATICALLY
    20  RESET THE SYSTEM COLD AIR SUPPLY TO THE HIGHEST TEMPERATURE
    21  LEVEL THAT WILL SATISFY THE ZONE REQUIRING THE COOLEST AIR.
    22  SINGLE ZONE REHEAT SYSTEMS SHALL BE CONTROLLED TO SEQUENCE
    23  REHEAT AND COOLING.
    24  SECTION 215.  DUAL DUCT AND MULTIZONE SYSTEMS.
    25     THESE SYSTEMS SHALL BE PROVIDED WITH CONTROL THAT WILL
    26  AUTOMATICALLY RESET THE COLD DECK AIR SUPPLY TO THE HIGHEST
    27  TEMPERATURE THAT WILL SATISFY THE ZONE REQUIRING THE COOLEST AIR
    28  AND THE HOT DECK AIR SUPPLY TO THE LOWEST TEMPERATURE THAT WILL
    29  SATISFY THE ZONE REQUIRING THE WARMEST AIR.
    30  SECTION 216.  RECOOLING SYSTEMS.
    19770H0552B1775                 - 33 -

     1     SYSTEMS IN WHICH HEATED AIR IS RECOOLED DIRECTLY OR
     2  INDIRECTLY, TO MAINTAIN SPACE TEMPERATURE, SHALL BE PROVIDED
     3  WITH CONTROL THAT WILL AUTOMATICALLY RESET THE TEMPERATURE TO
     4  WHICH THE SUPPLY AIR IS HEATED TO THE LOWEST LEVEL THAT WILL
     5  SATISFY THE ZONE REQUIRING THE WARMEST AIR.
     6  SECTION 217.  MULTIPLE ZONES.
     7     FOR SYSTEMS WITH MULTIPLE ZONES, ONE OR MORE ZONES MAY BE
     8  CHOSEN TO REPRESENT A NUMBER OF ZONES WITH SIMILAR HEATING OR
     9  COOLING CHARACTERISTICS. A MULTIPLE ZONE HEATING, VENTILATING
    10  AND AIR CONDITIONING SYSTEM THAT EMPLOYS REHEATING OR RECOOLING
    11  FOR CONTROL OF NOT MORE THAN 5,000 CFM OR 20% OF THE TOTAL
    12  SUPPLY AIR OF THE SYSTEM, WHICHEVER IS LESS, SHALL BE EXEMPT
    13  FROM THE SUPPLY AIR TEMPERATURE RESET REQUIREMENTS OF SECTIONS
    14  214 THROUGH 216.
    15  SECTION 218.  CONCURRENT OPERATION.
    16     CONCURRENT OPERATION OF INDEPENDENT HEATING AND COOLING
    17  SYSTEMS SERVING COMMON SPACES, AND REQUIRING THE USE OF NEW
    18  ENERGY FOR HEATING OR COOLING SHALL BE MINIMIZED BY ONE OR BOTH
    19  OF THE FOLLOWING:
    20         (1)  BY PROVIDING SEQUENTIAL TEMPERATURE CONTROL OF BOTH
    21     HEATING AND COOLING CAPACITY IN EACH ZONE.
    22         (2)  BY LIMITING THE HEATING ENERGY INPUT, THROUGH
    23     AUTOMATIC RESET CONTROL OF THE HEATING MEDIUM TEMPERATURE (OR
    24     ENERGY INPUT RATE), TO ONLY THAT NECESSARY TO OFFSET HEAT
    25     LOSS DUE TO TRANSMISSION AND INFILTRATION AND, WHERE
    26     APPLICABLE, TO HEAT THE VENTILATION AIR SUPPLY TO THE SPACE.
    27  SECTION 219.  EQUIPMENT PERFORMANCE REQUIREMENTS.
    28     (A)  APPLICATION.--THE REQUIREMENTS OF THIS SECTION APPLY TO
    29  EQUIPMENT AND COMPONENT PERFORMANCE FOR HEATING, VENTILATING AND
    30  AIR CONDITIONING SYSTEMS. WHERE EQUIPMENT EFFICIENCY LEVELS ARE
    19770H0552B1775                 - 34 -

     1  SPECIFIED, DATA FURNISHED BY THE EQUIPMENT SUPPLIER OR CERTIFIED
     2  UNDER A NATIONALLY RECOGNIZED CERTIFICATION PROGRAM OR RATING
     3  PROCEDURE SHALL BE USED TO SATISFY THESE REQUIREMENTS.
     4     (B)  ELECTRIC SYSTEM EQUIPMENT.--HEATING VENTILATING AND AIR
     5  CONDITIONING SYSTEMS EQUIPMENT WHOSE ENERGY INPUT IN THE COOLING
     6  MODE IS ENTIRELY ELECTRIC SHALL SLOW A COEFFICIENT OF
     7  PERFORMANCE (COP) AND ENERGY EFFICIENCY RATIO (EER) NOT LESS
     8  THAN THE VALUES SPECIFIED IN TABLE 11. THESE REQUIREMENTS APPLY
     9  TO, BUT ARE NOT LIMITED TO, UNITARY COOLING EQUIPMENT (AIR AND
    10  WATER SOURCE); PACKAGED AIR CONDITIONERS; AND ROOM AIR
    11  CONDITIONERS. THESE REQUIREMENTS DO NOT APPLY TO EQUIPMENT USED
    12  IN AREAS HAVING OPEN REFRIGERATED FOOD DISPLAY CASES. FOR
    13  DETERMINING COEFFICIENT OF PERFORMANCE (COP), THE RATE OF NET
    14  HEAT REMOVAL SHALL BE DEFINED AS THE CHANGE IN THE TOTAL HEAT
    15  CONTENTS OF THE AIR ENTERING AND LEAVING THE EQUIPMENT (WITHOUT
    16  REHEAT). TOTAL ENERGY INPUT SHALL BE DETERMINED BY COMBINING THE
    17  ENERGY INPUTS TO ALL ELEMENTS OF THE EQUIPMENT, INCLUDING BUT
    18  NOT LIMITED TO, COMPRESSORS, PUMPS, SUPPLY-AIR FANS, COOLING
    19  TOWER FANS AND THE SYSTEM EQUIPMENT CONTROL CIRCUIT.
    20                              TABLE 11
    21       MINIMUM EER AND COP FOR ELECTRIC HEATING, VENTILATING
    22               AND AIR CONDITIONING SYSTEM EQUIPMENT
    23  STANDARD RATING CAPACITY                       EER     COP
    24  UNDER 65,000 BTU/HR (19,050 WATTS)             6.1     1.8
    25  65,000 BTU/HR (19,050 WATTS) AND OVER          6.8     2.0
    26     (C)  OTHER SYSTEM EQUIPMENT.--HEAT OPERATED COOLING EQUIPMENT
    27  SHALL SHOW A COEFFICIENT OF PERFORMANCE (COP) IN THE COOLING
    28  MODE NOT LESS THAN THE VALUES SPECIFIED IN TABLE 12. THESE
    29  REQUIREMENTS APPLY TO, BUT ARE NOT LIMITED TO, ABSORPTION,
    30  ENGINE-DRIVEN AND TURBINE-DRIVEN EQUIPMENT. THE COEFFICIENT OF
    19770H0552B1775                 - 35 -

     1  PERFORMANCE (COP) IS DETERMINED EXCLUDING THE ELECTRICAL
     2  AUXILIARY INPUTS.
     3                              TABLE 12
     4     MINIMUM COP FOR HEATING, VENTILATING AND AIR CONDITIONING
     5               SYSTEM HEAT OPERATED COOLING EQUIPMENT
     6         HEAT SOURCE                             MINIMUM COP
     7  DIRECT FIRED (GAS, OIL)                            0.40
     8  INDIRECT FIRED (STEAM, HOT WATER)                  0.65
     9     (D)  SYSTEM COMPONENTS.--HEATING, VENTILATING AND AIR
    10  CONDITIONING SYSTEM COMPONENTS WHOSE ENERGY INPUT IN THE COOLING
    11  MODE IS ENTIRELY ELECTRIC SHALL SHOW A COEFFICIENT OF
    12  PERFORMANCE (COP) AND ENERGY EFFICIENCY RATIO (EER) NOT LESS
    13  THAN THE VALUES SPECIFIED IN TABLE 13. FOR DETERMINING
    14  COEFFICIENT OF PERFORMANCE (COP), THE RATE OF HEAT REMOVAL IS
    15  DEFINED AS THE DIFFERENCE IN TOTAL HEAT CONTENTS OF THE WATER OR
    16  REFRIGERANT ENTERING OR LEAVING THE COMPONENT. TOTAL ENERGY
    17  INPUT SHALL BE DETERMINED BY COMBINING THE ENERGY INPUTS TO ALL
    18  ELEMENTS AND ACCESSORIES OF THE COMPONENT, INCLUDING BUT NOT
    19  LIMITED TO, COMPRESSORS, INTERNAL CIRCULATING PUMPS, CONDENSER-
    20  AIR FANS, EVAPORATIVE-CONDENSER COOLING HEATER PUMPS, PURGE, AND
    21  THE COMPONENT CONTROL CIRCUIT.
    22                              TABLE 13
    23      MINIMUM COP FOR ELECTRICALLY DRIVEN HEATING, VENTILATING
    24               AND AIR CONDITIONING SYSTEM COMPONENTS
    25     COMPONENT                       AIR     WATER     EVAPORATION
    26                 CONDENSING MEANS  EER COP  EER COP     EER COP
    27  SELF-CONTAINED    CENTRIFUGAL    7.5 2.2  12.9 3.8
    28  WATER CHILLERS
    29                     POSITIVE
    30                   DISPLACEMENT    7.2 2.1  10.9 3.2
    19770H0552B1775                 - 36 -

     1  CONDENSERLESS      POSITIVE
     2  WATER CHILLERS   DISPLACEMENT    8.9 2.6  10.9 3.2
     3  COMPRESSOR AND
     4  CONDENSER UNITS    POSITIVE
     5  65,000 BTU/HR.   DISPLACEMENT    7.8 2.3  11.3 3.3   11.3 3.3
     6  (19.050 WATTS)
     7  AND OVER
     8     (E)  HEAT PUMPS.--HEAT PUMPS WHOSE ENERGY INPUT IS ENTIRELY
     9  ELECTRIC SHALL SHOW A COEFFICIENT OF PERFORMANCE (COP), HEATING,
    10  NOT LESS THAN THE VALUES SPECIFIED IN TABLE 14.
    11                              TABLE 14
    12              MINIMUM COP FOR HEAT PUMPS, HEATING MODE
    13  SOURCE AND OUTDOOR TEMPERATURE (DEGREE F.)         MINIMUM COP
    14  AIR SOURCE--47 DB/43 WB                               2.2
    15  AIR SOURCE--17 DB/15 WB                               1.2
    16  WATER SOURCE--60 ENTERING                             2.2
    17     (F)  SUPPLEMENTARY HEATER.--THE HEAT PUMP SHALL BE INSTALLED
    18  WITH A CONTROL TO PREVENT SUPPLEMENTARY HEATER OPERATION WHEN
    19  THE HEATING LOAD CAN BE MET BY THE HEAT PUMP ALONE.
    20  SUPPLEMENTARY HEATER OPERATION IS PERMITTED DURING TRANSIENT
    21  PERIODS, SUCH AS START-UPS, FOLLOWING ROOM THERMOSTAT SETPOINT
    22  ADVANCE, AND DURING DEFROST. A TWO-STAGE ROOM THERMOSTAT, WHICH
    23  CONTROLS THE SUPPLEMENTARY HEAT ON ITS SECOND STAGE, SHALL BE
    24  ACCEPTED AS MEETING THIS REQUIREMENT. THE CUT-ON TEMPERATURE FOR
    25  THE COMPRESSION HEATING SHALL BE HIGHER THAN THE CUT-ON
    26  TEMPERATURE FOR THE SUPPLEMENTARY HEAT, AND THE CUT-OFF
    27  TEMPERATURE FOR THE COMPRESSION HEATING SHALL BE HIGHER THAN THE
    28  CUT-OFF TEMPERATURE FOR THE SUPPLEMENTARY HEAT. SUPPLEMENTARY
    29  HEAT MAY BE DERIVED FROM ANY SOURCE OF ELECTRIC RESISTANCE
    30  HEATING OR COMBUSTION HEATING.
    19770H0552B1775                 - 37 -

     1     (G)  COMBUSTION HEATING EQUIPMENT.--ALL GAS AND OILFIRED
     2  COMFORT HEATING EQUIPMENT SHALL SHOW A MINIMUM COMBUSTION
     3  EFFICIENCY OF 75% AT MAXIMUM RATED OUTPUT. COMBUSTION EFFICIENCY
     4  SHALL BE DETERMINED IN ACCORDANCE WITH THE ASHRAE STANDARD 90.
     5  SECTION 220.  DUCT INSULATION.
     6     (A)  INSULATION.--ALL DUCT SYSTEMS, OR PORTIONS THEREOF,
     7  EXPOSED TO NONCONDITIONED SPACES SHALL BE INSULATED TO PROVIDE A
     8  THERMAL RESISTANCE, EXCLUDING FILM RESISTANCE, OF
     9             TI - TO
    10         R = --------(HR) (SQ.FT) (F)/BTU
    11               15
    12  WHERE TI-TO IS THE DESIGN TEMPERATURE DIFFERENTIAL (ABSOLUTE
    13  VALUE) BETWEEN THE AIR IN THE DUCT AND THE SURROUNDING AIR WITH
    14  CERTAIN EXCEPTIONS, DUCT INSULATION, EXCEPT WHEN NEEDED TO
    15  PREVENT CONDENSATION, IS NOT REQUIRED IN ANY OF THE FOLLOWING
    16  CASES:
    17         (1)  WHERE TI-TO IS 25 DEGREES F. OR LESS.
    18         (2)  WHEN THE HEAT GAIN OR LOSS OF THE DUCTS, WITHOUT
    19     INSULATION, WILL NOT INCREASE THE ENERGY REQUIREMENTS OF THE
    20     BUILDING.
    21         (3)  EXHAUST AIR DUCTS.
    22         (4)  SUPPLY OR RETURN AIR DUCTS INSTALLED IN CRAWL SPACES
    23     WITH INSULATED WALLS, BASEMENTS OR CELLARS IN ONE AND TWO-
    24     FAMILY DWELLINGS.
    25     (B)  VAPOR BARRIERS.--WHERE REQUIRED TO PREVENT CONDENSATION,
    26  INSULATION WITH VAPOR BARRIERS SHALL BE INSTALLED IN ADDITION TO
    27  INSULATION REQUIRED ABOVE.
    28  SECTION 221.  SYSTEM CONTROLS.
    29     (A)  APPLICATION.--ALL HEATING, VENTILATING AND AIR
    30  CONDITIONING SYSTEMS SHALL BE PROVIDED CONTROLS AS SPECIFIED
    19770H0552B1775                 - 38 -

     1  HEREIN.
     2     (B)  TEMPERATURE.--EACH HEATING, VENTILATING AND AIR
     3  CONDITIONING SYSTEM SHALL BE PROVIDED WITH AT LEAST ONE
     4  THERMOSTAT FOR THE REGULATION OF TEMPERATURE. EACH THERMOSTAT
     5  SHALL BE CAPABLE OF BEING SET FROM 55 DEGREES F. TO 75 DEGREES
     6  F. WHERE USED TO CONTROL HEATING ONLY AND FROM 70 DEGREES F. TO
     7  85 DEGREES F. WHERE USED TO CONTROL COOLING ONLY. WHERE USED TO
     8  CONTROL BOTH HEATING AND COOLING IT SHALL BE CAPABLE OF BEING
     9  SET FROM 55 DEGREES F. TO 85 DEGREES F. AND SHALL BE CAPABLE OF
    10  OPERATING THE SYSTEM HEATING AND COOLING IN SEQUENCE. IT SHALL
    11  BE ADJUSTABLE TO PROVIDE A TEMPERATURE RANGE OF UP TO 10 DEGREES
    12  F. BETWEEN FULL HEATING AND FULL COOLING, EXCEPT AS ALLOWED IN
    13  SECTION 218.
    14     (C)  HUMIDITY.--IF A HEATING, VENTILATING AND AIR
    15  CONDITIONING SYSTEM IS EQUIPPED WITH A MEANS FOR ADDING MOISTURE
    16  TO MAINTAIN SPECIFIC SELECTED RELATIVE HUMIDITIES IN SPACES OR
    17  ZONES, A HUMIDISTAT SHALL BE PROVIDED. THIS DEVICE SHALL BE
    18  CAPABLE OF BEING SET TO PREVENT NEW ENERGY FROM BEING USED TO
    19  PRODUCE SPACE RELATIVE HUMIDITY ABOVE 30% R.H.  WHERE A
    20  HUMIDISTAT IS USED IN A HEATING, VENTILATING AND AIR
    21  CONDITIONING SYSTEM FOR CONTROLLING MOISTURE REMOVAL TO MAINTAIN
    22  SPECIFIC SELECTED RELATIVE HUMIDITIES IN SPACES OR ZONES, IT
    23  SHALL BE CAPABLE OF BEING SET TO PREVENT NEW ENERGY FROM BEING
    24  USED TO PRODUCE A SPACE RELATIVE HUMIDITY BELOW 60%.
    25     (D)  TEMPERATURE ZONING.--
    26         (1)  IN ALL BUILDINGS AND STRUCTURES OF USE GROUP R-3, AT
    27     LEAST ONE THERMOSTAT FOR REGULATION OF SPACE TEMPERATURE
    28     SHALL BE PROVIDED FOR EACH SEPARATE HEATING, VENTILATING AND
    29     AIR CONDITIONING SYSTEM. IN ADDITION, A READILY ACCESSIBLE
    30     MANUAL OR AUTOMATIC MEANS SHALL BE PROVIDED TO PARTIALLY
    19770H0552B1775                 - 39 -

     1     RESTRICT OR SHUT-OFF THE HEATING OR COOLING INPUT TO EACH
     2     ZONE OR FLOOR, EXCLUDING UNHEATED OR UNCOOLED BASEMENTS AND
     3     GARAGES.
     4         (2)  IN ALL BUILDINGS AND STRUCTURES OF USE GROUP R-2,
     5     EACH INDIVIDUAL DWELLING UNIT SHALL BE CONSIDERED SEPARATELY
     6     AND SHALL MEET THE REQUIREMENTS FOR ONE AND TWO-FAMILY
     7     DWELLINGS ABOVE.
     8         (3)  IN ALL BUILDINGS AND STRUCTURES OTHER THAN USE GROUP
     9     R-3 AND IN SPACES OTHER THAN DWELLING UNITS IN USE GROUP R-2,
    10     AT LEAST ONE THERMOSTAT FOR REGULATION OF SPACE TEMPERATURE
    11     SHALL BE PROVIDED FOR EACH SEPARATE HEATING, VENTILATING AND
    12     AIR CONDITIONING SYSTEM AND FOR EACH FLOOR OF THE BUILDING.
    13     (E)  SET-BACK AND SHUT-OFF.--
    14         (1)  IN ALL BUILDINGS AND STRUCTURES, OR PORTIONS THEREOF
    15     OF USE GROUP R-3, THE THERMOSTAT, OR AN ALTERNATE MEANS SUCH
    16     AS A SWITCH OR A CLOCK, SHALL PROVIDE A READILY ACCESSIBLE,
    17     MANUAL OR AUTOMATIC MEANS FOR REDUCING THE ENERGY REQUIRED
    18     FOR HEATING AND COOLING DURING PERIODS OF NONUSE OR REDUCED
    19     NEED.
    20         (2)  IN ALL OTHER BUILDINGS AND STRUCTURES, OR PORTIONS
    21     THEREOF EACH HEATING, VENTILATING AND AIR CONDITIONING SYSTEM
    22     SHALL BE EQUIPPED WITH A READILY ACCESSIBLE MEANS OF REDUCING
    23     THE ENERGY USED FOR HEATING, VENTILATING AND AIR CONDITIONING
    24     DURING PERIODS OF NONUSE OR ALTERNATE USES OF THE BUILDING
    25     SPACES OR ZONES SERVED BY THE SYSTEM, SUCH AS WITH MANUALLY
    26     ADJUSTABLE AUTOMATIC TIMING DEVICES, MANUAL DEVICES FOR USE
    27     BY OPERATING PERSONNEL, OR AUTOMATIC CONTROL SYSTEMS.
    28         (3)  LOWERING THERMOSTAT SET POINTS TO REDUCE ENERGY
    29     CONSUMPTION OF HEATING SYSTEMS SHALL NOT CAUSE ENERGY TO BE
    30     EXPENDED TO REACH THE REDUCED SETTING.
    19770H0552B1775                 - 40 -

     1  SECTION 222.  STEAM AND HOT WATER HEATING PIPING.
     2     (A)  PIPING INSULATION.--ALL PIPING SERVING AS PART OF A
     3  HEATING OR COOLING SYSTEM INSTALLED TO SERVE BUILDINGS AND
     4  WITHIN BUILDINGS SHALL BE THERMALLY INSULATED AS SHOWN IN TABLE
     5  15.
     6                              TABLE 15
     7                      MINIMUM PIPE INSULATION
     8                                 INSULATION THICKNESS IN INCHES
     9             FLUID                       FOR PIPE SIZES
    10  PIPING  TEMPERATURE
    11  SYSTEM     RANGE,   RUNOUTS  1" AND  1 1/4-  2 1/2-  5&   8" AND
    12  TYPES        F.     UP TO 2"  LESS     2       4     6    LARGER
    13  HEATING SYSTEMS
    14     STEAM &
    15     HOT WATER
    16  HIGH PRESSURE/
    17  TEMP       306-450   1 1/2     1 1/2    2    2 1/2  3 1/2  3 1/2
    18  MED. PRESSURE/
    19  TEMP       251-305   1 1/2     1 1/2    2    2 1/2  3      3
    20  LOW PRESSURE/
    21  TEMP       201-250   1         1       1 1/2 1 1/2  2      2
    22  LOW TEM-
    23  PERATURE   120-200    1/2       3/4     1    1      1      1 1/2
    24  STEAM CON-
    25  DENSATE      ANY     1         1        1    1 1/2  1 1/2  2
    26  (FOR FEED
    27  WATER)
    28  COOLING SYSTEMS
    29  CHILLED
    30  WATER,      40-55     1/2       1/2      3/4 1      1      1
    19770H0552B1775                 - 41 -

     1  REFRIGERANT,
     2  OR BRINE  BELOW 40   1         1       1 1/2  1 1/2 1 1/2  1 1/2
     3  INSULATION THICKNESSES ARE BASED ON INSULATION HAVING THERMAL
     4  RESISTANCES IN THE RANGE OF 4.0 TO 4.6 PER INCH OF THICKNESS ON
     5  A FLAT SURFACE AT A MEAN TEMPERATURE OF 75 DEGREES F. MINIMUM
     6  INSULATION THICKNESS SHALL BE INCREASED FOR MATERIALS HAVING R
     7  VALUES LESS THAN 4.0 OR MAY BE REDUCED FOR MATERIALS HAVING R
     8  VALUES GREATER THAN 4.6 PER INCH OF THICKNESS AS FOLLOWS:
     9     (B)  HIGH THERMAL RESISTANCE.--FOR MATERIALS WITH THERMAL
    10  RESISTANCE GREATER THAN R=4.5, THE MINIMUM INSULATION THICKNESS
    11  MAY BE REDUCED AS FOLLOWS:
    12         4.6 X TABLE 15 THICKNESS    =   NEW MINIMUM THICKNESS
    13               ACTUAL R
    14     (C)  LOW THERMAL RESISTANCE.--FOR MATERIALS WITH THERMAL
    15  RESISTANCE LESS THAN R=4.0 THE MINIMUM INSULATION THICKNESS
    16  SHALL BE INCREASED AS FOLLOWS:
    17         4.0 X TABLE 15 THICKNESS    =   NEW MINIMUM THICKNESS
    18               ACTUAL R
    19  PIPING INSULATION, EXCEPT WHEN NEEDED TO PREVENT CONDENSATION,
    20  IS NOT REQUIRED IN ANY OF THE FOLLOWING CASES:
    21         (1)  PIPING INSTALLED WITHIN HEATING, VENTILATING AND AIR
    22     CONDITIONING EQUIPMENT.
    23         (2)  PIPING AT TEMPERATURES BETWEEN 55 DEGREES F. AND 120
    24     DEGREES F.
    25         (3)  WHEN THE HEAT LOSS OR HEAT GAIN OF THE PIPING,
    26     WITHOUT INSULATION, DOES NOT INCREASE THE ENERGY REQUIREMENTS
    27     OF THE BUILDING.
    28         (4)  PIPING INSTALLED IN BASEMENTS OR CELLARS IN ONE AND
    29     TWO-FAMILY DWELLINGS.
    30     (D)  VAPOR BARRIERS.--WHERE REQUIRED TO PREVENT CONDENSATION,
    19770H0552B1775                 - 42 -

     1  INSULATION WITH VAPOR BARRIERS SHALL BE INSTALLED IN ADDITION TO
     2  INSULATION REQUIRED ABOVE.
     3                            SUBCHAPTER E
     4                          PLUMBING SYSTEMS
     5  SECTION 223.  PURPOSE.
     6     THIS SUBCHAPTER SETS FORTH PROVISIONS FOR DESIGN AND
     7  EQUIPMENT SELECTION FOR ENERGY CONSERVATION IN SERVICE WATER
     8  HEATING SYSTEMS.
     9  SECTION 224.  FIXTURES.
    10     (A)  LAVATORIES.--LAVATORIES IN RESTROOMS OF PUBLIC
    11  FACILITIES SHALL BE EQUIPPED WITH SELF-CLOSING OUTLET DEVICES
    12  WHICH LIMIT THE FLOW OF HOT WATER TO A MAXIMUM OF 0.5 GPM,
    13  DEVICES WHICH LIMIT THE OUTLET TEMPERATURE TO A MAXIMUM OF 110
    14  DEGREES F. AND SELFCLOSING VALVES WHICH LIMIT THE QUANTITY OF
    15  HOT WATER TO A MAXIMUM OF 0.25 GALLONS.
    16     (B)  SHOWERS.--SHOWERS USED FOR OTHER THAN SAFETY REASONS
    17  SHALL BE EQUIPPED WITH FLOW CONTROL DEVICES TO LIMIT TOTAL FLOW
    18  TO A MAXIMUM OF 3 GPM PER SHOWER HEAD.
    19  SECTION 225.  INSULATION.
    20     (A)  PIPING INSULATION.--PIPING IN REQUIRED RETURN
    21  CIRCULATION SYSTEMS SHALL BE INSULATED SO THAT HEAT LOSS IS
    22  LIMITED TO A MAXIMUM OF 25 BTUH PER SQUARE FOOT OF EXTERNAL PIPE
    23  SURFACE FOR ABOVE GROUND PIPING AND A MAXIMUM OF 35 BTUH PER
    24  SQUARE FOOT OF EXTERNAL PIPE SURFACE FOR UNDERGROUND PIPING.
    25  MAXIMUM HEAT LOSS SHALL BE DETERMINED AT A TEMPERATURE
    26  DIFFERENTIAL EQUAL TO THE MAXIMUM WATER TEMPERATURE MINUS A
    27  DESIGN AMBIENT TEMPERATURE NO HIGHER THAN 65 DEGREES F. EXCEPT
    28  THAT CONFORMANCE WITH TABLE 15 FOR "LOW TEMPERATURE PIPING
    29  SYSTEM" SHALL BE DEEMED AS COMPLYING WITH THIS SECTION.
    30     (B)  TANKS.--UNFIRED HOT WATER STORAGE TANKS SHALL BE
    19770H0552B1775                 - 43 -

     1  INSULATED SO THAT HEAT LOSS IS LIMITED TO A MAXIMUM OF 15 BTUH
     2  PER SQUARE FOOT OF EXTERNAL TANK SURFACE AREA. FOR PURPOSES OF
     3  DETERMINING THIS HEAT LOSS, THE DESIGN AMBIENT TEMPERATURE SHALL
     4  BE NO HIGHER THAN 65 DEGREES F.
     5  SECTION 226.  EQUIPMENT.
     6     (A)  PUMP OPERATION.--CIRCULATING HOT WATER SYSTEMS SHALL BE
     7  ARRANGED SO THAT THE CIRCULATING PUMP CAN BE CONVENIENTLY TURNED
     8  OFF EITHER AUTOMATICALLY OR MANUALLY WHEN THE HOT WATER SYSTEM
     9  IS NOT IN OPERATION.
    10     (B)  ELECTRIC WATER HEATERS.--ALL AUTOMATIC ELECTRIC STORAGE
    11  WATER HEATERS SHALL HAVE A STAND-BY LOSS NOT EXCEEDING 4 WATTS
    12  PER SQUARE FOOT OF TANK SURFACE AREA. THE METHOD OF TEST OF
    13  STAND-BY LOSS SHALL BE AS DESCRIBED IN SECTION 4.3.1 OF ANSI
    14  C72.1 HOUSEHOLD AUTOMATIC ELECTRICAL STORAGE-TYPE WATER HEATERS.
    15     (C)  GAS AND OIL-FIRED WATER HEATERS.--ALL GAS AND OIL-FIRED
    16  AUTOMATIC STORAGE HEATERS SHALL HAVE A RECOVERY EFFICIENCY, ER,
    17  NOT LESS THAN 75% AND A STAND-BY LOSS PERCENTAGE S, NOT
    18  EXCEEDING S=2.3+67/V WHERE V=RATED VOLUME IN GALLONS. THE METHOD
    19  OF TEST OF ER AND S SHALL BE AS DESCRIBED IN SECTION 2.7 OF ANSI
    20  Z21.10.3 CIRCULATING TANK, INSTANTANEOUS AND LARGE AUTOMATIC
    21  STORAGE TYPE WATER HEATERS, APPROVAL REQUIREMENTS FOR GAS WATER
    22  HEATERS.
    23  SECTION 227.  CONTROLS.
    24     (A)  TEMPERATURE CONTROLS.--ALL HOT WATER SUPPLY SYSTEMS
    25  SHALL BE EQUIPPED WITH AUTOMATIC TEMPERATURE CONTROLS CAPABLE OF
    26  ADJUSTMENTS FROM THE LOWEST TO THE HIGHEST ACCEPTABLE
    27  TEMPERATURE SETTINGS FOR THE INTENDED USE.
    28     (B)  SHUT DOWN.--A SEPARATE SWITCH SHALL BE PROVIDED TO
    29  TERMINATE THE ENERGY SUPPLIED TO ELECTRIC HOT WATER SUPPLY
    30  SYSTEMS. A SEPARATE VALVE SHALL BE PROVIDED TO TURN OFF THE
    19770H0552B1775                 - 44 -

     1  ENERGY SUPPLIED TO THE MAIN BURNER OF ALL OTHER TYPES OF HOT
     2  WATER SUPPLY SYSTEMS.
     3                            SUBCHAPTER F
     4                         ELECTRICAL SYSTEMS
     5  SECTION 228.  SYSTEM REQUIREMENTS.
     6     (A)  POWER FACTOR.--THE POWER FACTOR OF THE OVERALL
     7  ELECTRICAL DISTRIBUTION SYSTEM IN A BUILDING SHALL BE NOT LESS
     8  THAN 90% UNDER RATED DESIGN INSTALLED LOAD OF THE BUILDING,
     9  EITHER BY UTILIZATION EQUIPMENT DESIGN OR BY THE USE OF POWER
    10  FACTOR CORRECTIVE DEVICES. THE POWER FACTOR CORRECTIVE DEVICES
    11  MAY BE INSTALLED ON INDIVIDUAL EQUIPMENT, RATED GREATER THAN
    12  1,000 WATTS AND SWITCHED THEREWITH, REGIONALLY GROUPED, LOCATED
    13  AT THE SERVICE EQUIPMENT OR POWER FACTOR CORRECTION ACHIEVED BY
    14  OTHER EQUIVALENT MEANS. THE CHOICE AMONG THESE CORRECTIVE
    15  METHODS SHOULD BE MADE BASED UPON AN ENGINEERING EVALUATION OF
    16  EACH DISTRIBUTION SYSTEM.
    17     (B)  SERVICE VOLTAGE.--WHERE A CHOICE OF SERVICE VOLTAGE IS
    18  AVAILABLE, THE VOLTAGE RESULTING IN THE LEAST ENERGY LOSS SHALL
    19  BE USED.
    20     (C)  VOLTAGE DROP.--IN ANY BUILDING, THE MAXIMUM TOTAL
    21  VOLTAGE DROP SHALL NOT EXCEED 3% IN BRANCH CIRCUITS OR FEEDERS,
    22  FOR A TOTAL OF 5% TO THE FARTHEST OUTLET BASED ON STEADY STATE
    23  DESIGN LOAD CONDITIONS.
    24     (D)  LIGHTING SWITCHING.--SWITCHING SHALL BE PROVIDED FOR
    25  EACH LIGHTING CIRCUIT, OR FOR PORTIONS OF EACH CIRCUIT, SO THAT
    26  THE PARTIAL LIGHTING REQUIRED FOR CUSTODIAL OR FOR EFFECTIVE
    27  COMPLEMENTARY USE WITH NATURAL LIGHTING MAY BE OPERATED
    28  SELECTIVELY.
    29     (E)  SEPARATE METERING.--IN ALL MULTI-FAMILY DWELLING
    30  PROVISIONS SHALL BE MADE TO DETERMINE THE ELECTRICAL ENERGY
    19770H0552B1775                 - 45 -

     1  CONSUMED BY EACH TENANT.
     2                            SUBCHAPTER G
     3                              LIGHTING
     4  SECTION 229.  LIGHT POWER BUDGET.
     5     A LIGHTING POWER BUDGET IS THE UPPER LIMIT OF THE POWER TO BE
     6  AVAILABLE TO PROVIDE THE LIGHTING NEEDS IN ACCORDANCE WITH A
     7  GIVEN SET OF CRITERIA AND GIVEN CALCULATION PROCEDURE.
     8  SECTION 230.  CALCULATION METHODS.
     9     THE CRITERIA SPECIFIED BELOW SHALL BE UTILIZED FOR
    10  COMPUTATION OF THE LIGHTING POWER BUDGET. ALL CALCULATIONS SHALL
    11  BE IN ACCORDANCE WITH ACCEPTED ENGINEERING PRACTICE. WHEN
    12  INSUFFICIENT INFORMATION IS KNOWN ABOUT THE SPECIFIC USE OF THE
    13  BUILDING SPACE (E.G., NUMBER OF OCCUPANTS, SPACE FUNCTION,
    14  LOCATION OF PARTITIONS), THE BUDGET SHALL BE BASED ON THE
    15  APPARENT INTENDED USE OF THE BUILDING SPACE.
    16  SECTION 231.  BUILDING INTERIORS.
    17     (A)  PROCEDURE.--THE ALLOWABLE ELECTRIC POWER FOR LIGHTING
    18  SHALL BE ESTABLISHED BY USING THE CRITERIA AND THE CALCULATION
    19  PROCEDURES SPECIFIED IN SECTION 234. THE VALUE SHALL BE BASED ON
    20  THE USE FOR WHICH THE SPACE WITHIN THE BUILDING IS INTENDED AND
    21  ON EFFICIENT ENERGY UTILIZATION.
    22     (B)  ILLUMINATION LEVEL CRITERIA.--FOR THE PURPOSE OF
    23  ESTABLISHING A BUDGET, LEVELS OF ILLUMINATION SHALL BE THOSE
    24  LISTED IN FIG. 9-80 OF THE IES LIGHTING HANDBOOK, AND THOSE
    25  LEVELS SHALL BE USED AS FOLLOWS:
    26         (1)  FOR TASK LIGHTING, THE LEVELS OF ILLUMINATION LISTED
    27     ARE FOR SPECIFIC TASKS. THESE LEVELS ARE FOR THE TASK AREAS
    28     DEFINED IN THE IES LIGHTING HANDBOOK OR, WHERE NOT DEFINED,
    29     AT ALL USABLE PORTIONS OF TASK SURFACES. IN SOME CASES, THE
    30     LEVELS OF ILLUMINATION ARE LISTED FOR LOCATIONS (E.G.,
    19770H0552B1775                 - 46 -

     1     AUDITORIUMS). THESE LEVELS ARE TO BE CONSIDERED AS AVERAGE
     2     LEVELS.
     3         (2)  FOR GENERAL LIGHTING, IN AREAS SURROUNDING TASK
     4     LOCATIONS, THE AVERAGE LEVEL OF GENERAL LIGHTING, FOR BUDGET
     5     PURPOSES ONLY, SHALL BE ONE-THIRD THE LEVEL FOR THE TASKS
     6     PERFORMED IN THE AREA BUT IN NO CASE LESS THAN 20-FOOT
     7     CANDLES. WHERE MORE THAN ONE TASK LEVEL OCCURS IN A SPACE,
     8     THE GENERAL LEVEL SHALL BE ONE-THIRD THE WEIGHTED AVERAGE OF
     9     THE SPECIFIC TASK LEVELS.
    10         (3)  FOR NONCRITICAL LIGHTING, IN CIRCULATION AND SEATING
    11     AREAS, WHERE NO SPECIFIC VISUAL TASK OCCUR, THE AVERAGE LEVEL
    12     OF ILLUMINATION SHALL BE ONE-THIRD OF THE AVERAGE GENERAL
    13     LIGHTING IN THE ADJACENT TASK SPACES BUT IN NO CASE LESS THAN
    14     TEN-FOOT CANDLES.
    15         (4)  FOR THE PURPOSE OF ESTABLISHING A POWER BUDGET, ONLY
    16     LAMP EFFICACIES AND COEFFICIENTS OF UTILIZATION (CU)
    17     SPECIFIED IN TABLE 16, SHALL BE ASSUMED.
    18  SECTION 232.  BUILDING EXTERIORS.
    19     (A)  BASIS ON USE.--IN EXTERIOR SPACES, THE LIGHTING POWER
    20  BUDGET SHALL BE BASED ON THE USE OF WHICH THE SPACE IS INTENDED
    21  (FOR TASK PERFORMANCE, SAFETY, OR SECURITY) AND ON EFFICIENT
    22  ENERGY UTILIZATION.
    23     (B)  CRITERIA.--THE SAME CRITERIA AS THOSE FOR INTERIOR
    24  SPACES APPLY FOR ILLUMINATION LEVELS AND LIGHTING SYSTEMS WITH
    25  THE ADDITION OF LUMINAIRES FOR FLOOD LIGHTING. FOR POWER BUDGET
    26  PURPOSES FLOODLIGHTING SHALL BE SELECTED WITH LUMINAIRES HAVING
    27  A GREATER PERCENTAGE OF THEIR BEAM LUMENS RESTRICTED TO THE AREA
    28  TO BE LIGHTED. SUCH LUMINAIRES ARE DEFINED AS THOSE WITH AT
    29  LEAST THE MINUMUM EFFICIENCIES LISTED IN THE IES LIGHTING
    30  HANDBOOK.
    19770H0552B1775                 - 47 -

     1     (C)  FACADE LIGHTING.--FACADE LIGHTING FOR BUDGET PURPOSES
     2  SHALL BE NO GREATER THAN 2% OF THE TOTAL INTERIOR LOAD OF THE
     3  BUILDING.
     4     (D)  CALCULATION PROCEDURE.--IN ESTABLISHING A LIGHTING POWER
     5  BUDGET THE FOLLOWING PROCEDURES SHALL BE USED:
     6         (1)  FOR OVERHEAD LIGHTING THE PROCEDURE SPECIFIED IN
     7     SECTION 234 SHALL BE FOLLOWED, BUT USING REFLECTANCES AS
     8     FOUND.
     9         (2)  FOR FLOOD LIGHTING THE BEAM LUMEN METHOD, AS SHOWS
    10     IN THE IES LIGHTING HANDBOOK AND A COEFFICIENT OF BEAM
    11     UTILIZATION (CBU) OF 0.75 SHALL BE USED FOR FLOODLIGHTING
    12     CALCULATIONS.
    13  SECTION 233.  EXCEPTIONS TO CRITERIA.
    14     (A)  INTERIORS.--THE CRITERIA OF SECTION 231 SHALL NOT APPLY
    15  TO THE FOLLOWING AREAS WHEN CALCULATING THE LOAD.
    16         (1)  PORTIONS OF RESIDENTIAL OCCUPANCIES EXCEPT FOR
    17     KITCHENS, BATHROOMS, AND LAUNDRY AREAS AND PUBLIC SPACES
    18     INCLUDING LOBBIES, HALLS, STAIRWAYS, BASEMENT AREAS, AND
    19     UTILITY ROOMS.
    20         (2)  RESIDENTIAL TYPE SPACES SIMILAR TO THOSE STATED IN
    21     PARAGRAPH (1) IN INSTITUTIONS, SUCH AS HOSPITALS, HOTELS,
    22     FUNERAL HOMES, CHURCHES, MUSEUMS, ETC.
    23         (3)  THEATER AUDITORIUMS, ENTERTAINMENT AND AUDIOVISUAL
    24     PRESENTATIONS WHERE THE LIGHTING IS AN ESSENTIAL TECHNICAL
    25     ELEMENT FOR THE FUNCTION PERFORMED.
    26     (B)  EXTERIORS.--THE CRITERIA OF SECTION 232 SHALL NOT APPLY
    27  TO THE FOLLOWING LAMPS AND LUMINARIES; HOWEVER, THEIR USE SHALL
    28  BE ACCOUNTED FOR IN THE CALCULATION OF TASK LIGHTING LOADS FOR
    29  SPECIFIC TASKS. THE ALLOWABLE LOAD SHALL BE BASED ON THE
    30  LUMINARY WATTAGE TO ACHIEVE THE LEVELS OF ILLUMINATION AS
    19770H0552B1775                 - 48 -

     1  COVERED IN SECTION 231 USING A POINT CALCULATION METHOD GIVEN IN
     2  THE IES LIGHTING HANDBOOK. THE EXCEPTED LAMPS AND LUMINARIES ARE
     3  AS FOLLOWS:
     4         (1)  LUMINARIES FOR MEDICAL AND DENTAL PURPOSES.
     5         (2)  LUMINARIES FOR HIGHLIGHTING APPLICATIONS, SUCH AS
     6     SCULPTURE EXHIBITS, ART EXHIBITS, AND INDIVIDUAL ITEMS OF
     7     DISPLAY MERCHANDISE.
     8         (3)  LUMINARIES FOR SPECIALIZED LIGHTING APPLICATIONS
     9     (COLOR MATCHING, WHERE ELECTRICAL INTERFERENCE CANNOT BE
    10     TOLERATED, ETC.).
    11     (C)  CONTROL OF REFLECTANCES.--THE CRITERIA OF TABLE 16 SHALL
    12  NOT APPLY IN SPACES WHERE IT IS IMPRACTICAL TO CONTROL
    13  REFLECTANCES AND WHERE A DIRTY ATMOSPHERE CANNOT BE AVOIDED.
    14  WHERE THIS CONDITION EXISTS, THE VALUES FOR REFLECTANCES AND
    15  LIGHT LOSS FACTORS SHALL BE THOSE EXPECTED TO BE FOUND AND SHALL
    16  BE APPROVED BY THE DEPARTMENT. THE CALCULATION SHALL MAKE A NOTE
    17  OF THIS DEVIATION.
    18  SECTION 234.  CALCULATION PROCEDURE.
    19     (A)  ILLUMINATION LEVELS AND AREAS.--TO ESTABLISH
    20  ILLUMINATION LEVELS AND AREAS, THE FOLLOWING PROCEDURE SHALL BE
    21  USED:
    22         (1)  DETERMINE THE VISUAL TASKS THAT ARE EXPECTED TO BE
    23     PERFORMED IN EACH SPACE AND THE NUMBER OF PLANNED WORK
    24     LOCATIONS WHERE TASKS WILL BE PERFORMED. IF ASSUMPTIONS ARE
    25     MADE, THEIR BASES SHALL BE INDICATED.
    26         (2)  SELECT THE ILLUMINATION LEVEL, IN FOOT-CANDLES FOR
    27     THOSE EXPECTED TASKS IN ACCORDANCE WITH SECTION 231(B)(1).
    28         (3)  CALCULATE TOTAL TASK AREAS TO BE ILLUMINATED TO THE
    29     SAME LEVEL BY MULTIPLYING THE NUMBER OF WORK LOCATIONS BY 50
    30     SQUARE FEET PER WORK LOCATION. (TOTAL TASK AREAS SHALL NOT
    19770H0552B1775                 - 49 -

     1     EXCEED ACTUAL TOTAL SPACE AREA). IF ACTUAL TASK AREA IS
     2     GREATER THAN 50 SQUARE FEET THE ACTUAL AREA SHALL BE USED. IF
     3     SPECIAL TASK LIGHTING OR LOCALIZED LIGHTING IS TO BE
     4     EMPLOYED, USE THE ACTUAL TASK AREAS AND POINT CALCULATION
     5     PROCEDURES.
     6         (4)  CALCULATE THE LEVEL OF GENERAL LIGHTING BY
     7     MULTIPLYING THE TASK LIGHTING LEVEL BY ONE-THIRD, WHERE THERE
     8     IS ONLY ONE TASK LEVEL, OR BY TAKING ONE-THIRD OF THE SUM OF
     9     THE PRODUCTS OF THE TASK LEVELS AS PROVIDED FOR IN PARAGRAPH
    10     (2) AND THEIR AREAS AS PROVIDED FOR IN PARAGRAPH (3) DIVIDED
    11     BY THE TOTAL TASK AREAS.
    12         (5)  CALCULATE THE LEVEL OF NONCRITICAL LIGHTING.
    13     (B)  LIGHTING SYSTEM DATA.--TO ESTABLISH LIGHTING SYSTEM
    14  DATA, THE FOLLOWING SHALL BE USED:
    15         (1)  LIGHT SOURCE AND LUMINAIRE TYPES TO USE.
    16         (2)  LAMP LUMENS PER WATT AND LUMINAIRE COEFFICIENTS OF
    17     UTILIZATION FOR ROOM AND LUMINAIRE MOUNTING HEIGHT
    18     DIMENSIONS. LUMINAIRE CUS SHALL BE SELECTED FROM THE IES
    19     LIGHTING HANDBOOK. IN ALL CASES, NO LUMINAIRE SHALL HAVE A CU
    20     FOR RCR = 1 OF LESS THAN THAT GIVEN IN TABLE 16 LAMP
    21     EFFICACIES FOR THE APPROPRIATE SPACE.
    22     (C)  ALLOWABLE WATTAGE.--TO ESTABLISH ALLOWABLE WATTAGE, THE
    23  FOLLOWING SHALL BE USED:
    24         (1)  USING DATA FROM SUBSECTION (B), THE ILLUMINATION
    25     LEVELS AND AREAS DETERMINED IN SUBSECTION (A), AND THE
    26     CRITERIA OF TABLE 16 ON REFLECTANCE, CALCULATE THE ALLOWABLE
    27     WATTAGES USING THE LUMEN METHOD.
    28         (2)  CALCULATE THE TOTAL SPACE WATTAGE BY ADDING THE
    29     TASK, GENERAL AND NONCRITICAL LIGHTING LOADS.
    30         (3)  ADD THE WATTAGE OF LUMINARIES ALLOWED IN SECTION
    19770H0552B1775                 - 50 -

     1     233(B).
     2                              TABLE 16
     3     (A)  LAMP EFFICACIES.--THE FOLLOWING ARE INITIAL LUMEN OUTPUT
     4  PER WATT INPUT, INCLUDING BALLAST LOSSES:
     5                 APPLICATION                             LUMENS
     6                                                        PER WATT
     7     WHERE MODERATE COLOR RENDITION IS APPROPRIATE         55
     8     WHERE GOOD COLOR RENDITION IS APPROPRIATE             40
     9     WHERE HIGH COLOR RENDITION IS APPROPRIATE,
    10     SPACES ARE LESS THAN 50 SQUARE FEET OR WHERE
    11     USE OF LOW WATTAGE HIGH INTENSITY DISCHARGE
    12     (HID) LAMPS UNDER 250 W OR FLUORESCENT
    13     LAMPS UNDER 40 W IS APPROPRIATE                       25
    14     (B)  LUMINARY COEFFICIENTS OF UTILIZATION (CU).--COEFFICIENTS
    15  OF UTILIZATION (CUS) ARE TO BE FOR LUMINARIES FOR USE IN THE
    16  TYPES OF SPACES LISTED BELOW, AND THOSE LUMINARIES SHALL HAVE A
    17  CU OF NO LESS THAN THAT LISTED BELOW (FOR EACH TYPE SPACE) FOR A
    18  ROOM CAVITY RATIO (RCR) OF 1 AND REFLECTANCES AS IN (C).
    19                 SPACE USE                           MINIMUM CU
    20                                                    (AT RCR - 1)
    21     FOR SPACES WITH TASKS SUBJECTED TO VEILING
    22     REFLECTIONS WHERE DESIGN LEVELS OF
    23     ILLUMINATION ARE LISTED IN TERMS OF
    24     EQUIVALENTS SPHERE ILLUMINATION (ESI) AND
    25     WHERE VISUAL COMFORT IS IMPORTANT.                  0.55
    26     FOR SPACES WITHOUT TASKS, OR WITH TASKS
    27     NOT SUBJECTED TO VEILING REFLECTIONS, BUT
    28     WHERE VISUAL COMFORT IS IMPORTANT.                  0.63
    29     FOR SPACES WITHOUT TASKS AND WHERE VISUAL
    30     COMFORT IS NOT A CRITERION                          0.70
    19770H0552B1775                 - 51 -

     1     (C)  OTHER CRITERIA; REFLECTANCES.--FOR INTERIOR SPACES, THE
     2  FOLLOWING INITIAL CAVITY AND SURFACE REFLECTANCES SHALL BE
     3  ASSUMED:
     4     CEILING CAVITY REFLECTANCE              80%
     5     WALL REFLECTANCE                        50%
     6     FLOOR CAVITY REFLECTANCE                20%
     7  LIGHT LOSS FACTOR.  A LIGHT LOSS FACTOR (LLF) OF 0.70 SHALL BE
     8  USED.
     9                            SUBCHAPTER H
    10                        ALTERNATIVE SYSTEMS
    11  SECTION 235.  PERFORMANCE ALTERNATIVE.
    12     ALTERNATIVE BUILDING SYSTEMS AND EQUIPMENT DESIGN MAY BE
    13  APPROVED BY THE DEPARTMENT WHEN THEY CAN BE SHOWN TO HAVE ENERGY
    14  CONSUMPTION NOT GREATER THAN THAT OF A SIMILAR BUILDING WITH
    15  SIMILAR FORMS OF ENERGY REQUIREMENTS, DESIGNED IN ACCORDANCE
    16  WITH THE PROVISIONS OF THIS ACT.
    17  SECTION 236.  NONDEPLETABLE SOURCES.
    18     WHEN SUCH ALTERNATIVE SYSTEMS UTILIZE SOLAR, GEOTHERMAL, WIND
    19  OR OTHER NONDEPLETABLE ENERGY SOURCES FOR ALL OR PART OF ITS
    20  ENERGY SOURCES, SUCH NONDEPLETABLE ENERGY SUPPLIED TO THE
    21  BUILDING SHALL BE EXCLUDED FROM THE TOTAL ENERGY CHARGEABLE TO
    22  THE PROPOSED ALTERNATIVE DESIGN.
    23  SECTION 237.  DOCUMENTATION.
    24     PROPOSED ALTERNATIVE DESIGNS, SUBMITTED AS REQUESTS FOR
    25  EXCEPTION TO THE STANDARD DESIGN CRITERIA, MUST BE ACCOMPANIED
    26  BY AN ENERGY ANALYSIS PREPARED IN ACCORDANCE WITH THE ASHRAE
    27  STANDARD 90.
    28                             CHAPTER 3
    29              APPLICATION OF STANDARDS: ESTABLISHMENT
    30                     OF COMMITTEE AND PENALTIES
    19770H0552B1775                 - 52 -

     1  SECTION 301.  MODIFICATION OF STANDARDS; CRITERIA.
     2     THE DEPARTMENT, WITH THE APPROVAL OF THE BUILDING ENERGY
     3  CONSERVATION COMMITTEE, ESTABLISHED PURSUANT TO SECTION 304,
     4  AFTER ONE OR MORE PUBLIC HEARINGS, MAY RECOMMEND TO THE GENERAL
     5  ASSEMBLY MODIFICATIONS TO THE ENERGY CONSERVATION STANDARDS. ANY
     6  RECOMMENDED MODIFICATION TO THE ENERGY CONSERVATION STANDARDS
     7  SHALL MEET THE FOLLOWING CRITERIA:
     8         (1)  IT SHALL BE CONSISTENT WITH THE LATEST AND MOST
     9     EFFECTIVE TECHNOLOGY.
    10         (2)  IT SHALL NOT BE IN CONFLICT WITH EXISTING SAFEGUARDS
    11     FOR PUBLIC HEALTH AND SAFETY.
    12         (3)  IT SHALL BE ECONOMICALLY FEASIBLE AS DETERMINED BY
    13     LIFE-CYCLE-COST PROCEDURES.
    14         (4)  IT SHALL BE SUFFICIENTLY STRINGENT TO EFFECT A
    15     SIGNIFICANT SAVINGS OF ENERGY RESOURCES.
    16         (5)  IT SHALL BE A PERFORMANCE STANDARD FOR THE DESIGN OF
    17     BUILDINGS AND SYSTEMS WITHIN BUILDINGS TO ASSURE MAXIMUM
    18     PRACTICAL CONSERVATION OF ENERGY.
    19         (6)  CONSIDERATION SHALL BE GIVEN TO BUILDING AND ENERGY
    20     STANDARDS PROMULGATED BY NATIONAL AND OTHER STATE
    21     GOVERNMENTAL AGENCIES, PRIVATE ORGANIZATIONS AND ANY OTHER
    22     AVAILABLE ENERGY DATA, AS WELL AS THE TOTAL ENERGY ALLOCATION
    23     APPROACH.
    24  SECTION 302.  APPLICATION OF ENERGY CONSERVATION STANDARDS.
    25     THE ENERGY CONSERVATION STANDARDS CONTAINED HEREIN SHALL
    26  APPLY TO NEW BUILDINGS OR TO RENOVATIONS ON WHICH ACTUAL
    27  CONSTRUCTION AND/OR DESIGN HAS NOT COMMENCED PRIOR TO THEIR
    28  EFFECTIVE DATE.
    29  SECTION 303.  ENERGY CONSERVATION MANUAL FOR BUILDINGS.
    30     (A)  PRODUCTION OF MANUAL.--CONCURRENT WITH THE ADOPTION OF
    19770H0552B1775                 - 53 -

     1  THE ENERGY CONSERVATION CODE REQUIRED BY THIS ACT, THE
     2  DEPARTMENT SHALL PRODUCE AN ENERGY CONSERVATION MANUAL FOR USE
     3  BY DESIGNERS, BUILDERS, AND CONTRACTORS OF RESIDENTIAL AND
     4  NONRESIDENTIAL BUILDINGS. THIS MANUAL SHALL CONTAIN THE
     5  ESTABLISHED STANDARDS AND ACCEPTED PRACTICES. THE MANUAL SHALL
     6  BE FURNISHED UPON REQUEST TO MEMBERS OF THE PUBLIC AT A PRICE
     7  SUFFICIENT TO COVER THE COST OF PRINTING.
     8     (B)  REVIEW OF MANUAL.--THE MANUAL SHALL BE REVIEWED BY THE
     9  DEPARTMENT AND THE BUILDING ENERGY CONSERVATION COMMITTEE AT
    10  LEAST ANNUALLY AND SHALL BE UPDATED AS SIGNIFICANT NEW ENERGY
    11  CONSERVATION INFORMATION BECOMES AVAILABLE.
    12  SECTION 304.  BUILDING ENERGY CONSERVATION COMMITTEE.
    13     (A)  COMPOSITION OF COMMITTEE.--IN ORDER TO FURTHER THE
    14  COORDINATED AND EFFECTIVE ADMINISTRATION OF THIS ACT, THERE IS
    15  HEREBY ESTABLISHED A BUILDING ENERGY CONSERVATION COMMITTEE. IT
    16  SHALL CONSIST OF AT LEAST 15 MEMBERS AND NO MORE THAN 25
    17  MEMBERS, THE MEMBERSHIP OF WHICH SHALL BE APPOINTED BY THE
    18  SECRETARY OF LABOR AND INDUSTRY AND SHALL INCLUDE A
    19  REPRESENTATIVE OF EACH OF THE FOLLOWING ENTITIES OR THEIR
    20  SUCCESSORS:
    21         (1)  DEPARTMENT OF EDUCATION.
    22         (2)  GOVERNOR'S ENERGY COUNCIL.
    23         (3)  DEPARTMENT OF GENERAL SERVICES.
    24         (4)  DEPARTMENT OF LABOR AND INDUSTRY.
    25         (5)  DEPARTMENT OF COMMUNITY AFFAIRS.
    26         (6)  PENNSYLVANIA BUILDERS ASSOCIATION.
    27         (7)  PENNSYLVANIA ASSOCIATED BUILDERS AND CONTRACTORS,
    28     INC.
    29         (8)  PENNSYLVANIA BUILDING OFFICIALS CONFERENCE.
    30         (9)  MECHANICAL CONTRACTORS ASSOCIATION OF AMERICA.
    19770H0552B1775                 - 54 -

     1         (10)  PENNSYLVANIA CHAMBER OF COMMERCE.
     2         (11)  GENERAL CONTRACTORS ASSOCIATION OF PENNSYLVANIA.
     3         (12)  PENNSYLVANIA SOCIETY OF ARCHITECTS.
     4         (13)  PENNSYLVANIA SOCIETY OF PROFESSIONAL ENGINEERS.
     5         (14)  REPRESENTATIVES OF SUCH OTHER AGENCIES AND
     6     ORGANIZATIONS OR INDIVIDUALS AS THE SECRETARY MAY FIND ARE
     7     NECESSARY AND PROPER TO CARRY OUT THE PURPOSES OF THE
     8     COMMITTEE INCLUDING, BUT NOT LIMITED TO, LABOR ORGANIZATIONS,
     9     FINANCIAL AND LENDING INSTITUTIONS, AND ORGANIZATIONS
    10     DIRECTLY INVOLVED IN THE SUPPLY OF ENERGY THROUGHOUT THE
    11     COMMONWEALTH.
    12     (B)  POWERS AND DUTIES.--IN ADDITION TO THE POWERS AND DUTIES
    13  ENUMERATED IN THIS ACT, THE BUILDING ENERGY CONSERVATION
    14  COMMITTEE SHALL PERFORM THE FOLLOWING DUTIES:
    15         (1)  THE COMMITTEE SHALL BE RESPONSIBLE FOR THE REGULAR
    16     EXCHANGE OF INFORMATION AND PLANS REGARDING BUILDING ENERGY
    17     CONSERVATION, FOR THE DEVELOPMENT AND REVIEW OF PROPOSED AND
    18     EXISTING STANDARDS, GUIDELINES, REGULATIONS, AND MANUALS, AND
    19     SHALL MAKE RECOMMENDATIONS TO THE INDUSTRIAL BOARD OF THE
    20     DEPARTMENT OF LABOR AND  INDUSTRY CONSISTENT WITH THE
    21     PROVISIONS OF THIS ACT.
    22         (2)  SAID COMMITTEE SHALL ACT AS AN ADVISORY COMMITTEE TO
    23     THE INDUSTRIAL BOARD OF THE DEPARTMENT OF LABOR AND INDUSTRY
    24     AND THE ADVISORY BOARD IN THE DEPARTMENT OF LABOR AND
    25     INDUSTRY IN MATTERS OF BUILDING ENERGY CONSERVATION AND MAY
    26     RECOMMEND TO THE INDUSTRIAL BOARD VARIANCES FROM STANDARDS,
    27     GUIDELINES, REGULATIONS AND MANUALS AFTER CONSULTATION WITHIN
    28     THE COMMITTEE OR WITH ANY PERSON AFFECTED BY SUCH STANDARDS,
    29     GUIDELINES, REGULATIONS OR MANUALS.
    30     (C)  EXPENSES.--THE MEMBERS OF THE COMMITTEE SHALL NOT
    19770H0552B1775                 - 55 -

     1  RECEIVE ANY COMPENSATION FOR THEIR SERVICES BUT SHALL BE
     2  REIMBURSED FOR THEIR ACTUAL AND NECESSARY EXPENSES INCURRED IN
     3  THE PERFORMANCE OF THEIR DUTIES. PROVIDED, HOWEVER, WHEN ACTING
     4  AS AN ADVISORY COMMITTEE TO THE INDUSTRIAL BOARD OR THE ADVISORY
     5  BOARD ON MATTERS CONCERNING VARIANCES WHICH HAVE BEEN REFERRED
     6  TO THE INDUSTRIAL BOARD, THEY SHALL RECEIVE $50 PER DAY PLUS
     7  THEIR ACTUAL AND NECESSARY EXPENSES.
     8  SECTION 305.  CERTIFICATION.
     9     (A)  COMPLIANCE WITH ACT.--IT SHALL BE THE DUTY OF THE
    10  ARCHITECT RETAINED IN CONNECTION WITH THE CONSTRUCTION OR
    11  RENOVATION OF A BUILDING TO CERTIFY THE DRAWINGS, SPECIFICATIONS
    12  AND OTHER DATA SHOWING COMPLIANCE WITH THE PROVISIONS OF THIS
    13  ACT.
    14     (B)  INSPECTION.--EACH ARCHITECT OR HIS DESIGNEE SHALL MAKE
    15  PERIODIC INSPECTIONS OF THE BUILDING PROGRESSION TO INSURE
    16  COMPLIANCE WITH THIS ACT.
    17     (C)  FINAL CERTIFICATION.--EACH ARCHITECT SHALL MAKE A FINAL
    18  CERTIFICATION OF EVERY COMPLETED BUILDING SHOWING COMPLIANCE
    19  WITH THE PROVISIONS OF THIS ACT.
    20     (D)  CERTIFICATION BY BUILDER; BONDS.--IF AN ARCHITECT IS NOT
    21  RETAINED IN CONNECTION WITH THE CONSTRUCTION OR RENOVATION OF A
    22  BUILDING, IT SHALL BE THE RESPONSIBILITY OF THE BUILDER TO
    23  PERFORM THE INSPECTIONS AND CERTIFICATION REQUIRED BY THIS
    24  SECTION AND TO FILE WITH THE DEPARTMENT AN INDEMNITY BOND IN
    25  SUCH AMOUNT AS THE DEPARTMENT SHALL REQUIRE INDEMNIFYING THE
    26  OWNER FOR ANY COSTS SAID OWNER MAY INCUR IN BRINGING THE
    27  BUILDING INTO COMPLIANCE WITH THIS ACT, SHOULD THE DEPARTMENT
    28  FIND IT TO BE IN NONCOMPLIANCE. SAID INDEMNITY BOND SHALL REMAIN
    29  IN FULL FORCE AND EFFECT FOR A PERIOD OF TWO YEARS FROM THE DATE
    30  OF COMPLETION OF THE CONSTRUCTION OR RENOVATION OF THE BUILDING.
    19770H0552B1775                 - 56 -

     1  SECTION 306.  VARIANCES.
     2     (A)  REQUESTS.--ANY REQUEST FOR A VARIANCE FROM THE ENERGY
     3  CONSERVATION STANDARDS CONTAINED HEREIN SHALL BE MADE TO THE
     4  INDUSTRIAL BOARD OF THE DEPARTMENT OF LABOR AND INDUSTRY.
     5     (B)  CRITERIA.--A VARIANCE SHALL BE GRANTED ONLY IF IT IS
     6  FOUND THAT:
     7         (1)  COMPLIANCE WITH THE PROVISIONS OF THIS ACT WOULD
     8     RESULT IN EXTREME HARDSHIP TO THE OWNER; AND
     9         (2)  THE GRANTING OF SUCH VARIANCE WOULD NOT RESULT IN A
    10     SIGNIFICANT INCREASE IN THE ENERGY USAGE OF THE BUILDING.
    11  SECTION 307.  BUILDING PERMITS.
    12     ANY BUILDING PERMIT ISSUED BY THE COMMONWEALTH OR ANY OF ITS
    13  POLITICAL SUBDIVISIONS SHALL HAVE PRINTED UPON ITS FACE NOTICE
    14  THAT THE PROVISIONS OF THIS ACT MUST BE COMPLIED WITH.
    15  SECTION 308.  PERMITS FOR USE OR OCCUPANCY.
    16     BEFORE ANY BUILDING OR STRUCTURE HEREAFTER CONSTRUCTED OR
    17  RENOVATED SHALL BE USED OR OPENED FOR OCCUPANCY, THE OWNER
    18  THEREOF SHALL NOTIFY THE DEPARTMENT OF LABOR AND INDUSTRY OF THE
    19  COMPLETION OF THE BUILDING AND SUBMIT THE NECESSARY
    20  CERTIFICATION THEREWITH. NO PERMIT FOR USE OR OCCUPANCY SHALL BE
    21  GRANTED UNTIL SUCH SUBMISSION HAS BEEN MADE. NO BUILDING
    22  OFFICIAL OF THE COMMONWEALTH OR ANY OF ITS POLITICAL
    23  SUBDIVISIONS SHALL ISSUE A PERMIT UNTIL HE HAS RECEIVED PROOF OF
    24  COMPLIANCE.
    25  SECTION 309.  FAILURE TO SUBMIT CERTIFICATION.
    26     WHENEVER THE OWNER OF ANY BUILDING OR STRUCTURE SHALL FAIL TO
    27  NOTIFY THE DEPARTMENT OF THE COMPLETION OF THE BUILDING AND TO
    28  SUBMIT THE NECESSARY CERTIFICATION AND SHALL NEVERTHELESS
    29  PROCEED WITH THE USE OR OCCUPANCY OF THE BUILDING, THE
    30  DEPARTMENT OR THE POLITICAL SUBDIVISION SHALL SERVE NOTICE ON
    19770H0552B1775                 - 57 -

     1  THE SAID OWNER TO IMMEDIATELY CEASE USING OR OCCUPYING SAID
     2  BUILDING AND A NOTICE SHALL BE PLACED ON THE PREMISES
     3  PROHIBITING SUCH USE OR OCCUPANCY UNTIL SUCH CERTIFICATION HAS
     4  BEEN SUBMITTED.
     5  SECTION 310.  INSPECTIONS.
     6     THE DEPARTMENT MAY INSPECT WITHIN TWO YEARS OF THE DATE OF
     7  COMPLETION OF CONSTRUCTION OR RENOVATION ANY BUILDING
     8  CONSTRUCTED OR RENOVATED AFTER THE EFFECTIVE DATE OF THIS ACT TO
     9  DETERMINE COMPLIANCE WITH THE PROVISIONS OF THIS ACT.
    10  SECTION 311.  FAILURE TO COMPLY WITH PROVISIONS OF THIS ACT.
    11     WHENEVER THE OWNER OF ANY BUILDING, AS DESCRIBED IN THIS ACT,
    12  SHALL FAIL TO COMPLY WITH THE PROVISIONS OF THIS ACT, OR THE
    13  RULES AND REGULATIONS OF THE DEPARTMENT FORMULATED UNDER THE
    14  AUTHORITY OF THIS ACT, AND UPON WHOM A WRITTEN ORDER SHALL BE
    15  SERVED BY THE DEPARTMENT TO COMPLY WITH THE SAID PROVISIONS OF
    16  THIS ACT AND THE RULES AND REGULATIONS OF THE DEPARTMENT AND WHO
    17  NEVERTHELESS SHALL HAVE FAILED TO COMPLY WITH THE SAID WRITTEN
    18  ORDER WITHIN THE TIME SPECIFIED IN THE SAME, THE DEPARTMENT
    19  SHALL BE AUTHORIZED TO IMMEDIATELY ORDER THE BUILDING OR
    20  STRUCTURE TO BE VACATED OR PLACED OUT OF SERVICE UNTIL SUCH TIME
    21  AS THE REQUIREMENTS OF THIS ACT AND THE RULES AND REGULATIONS OF
    22  THE DEPARTMENT SHALL HAVE BEEN FULLY COMPLIED WITH.
    23  SECTION 312.  APPEALS.
    24     REVIEW OF ANY DECISIONS RENDERED UNDER THE PROVISIONS OF THIS
    25  ACT SHALL BE BROUGHT IN THE COURT OF COMMON PLEAS OF THE COUNTY
    26  WHEREIN THE BUILDING IS SITUATED. SUCH REVIEW SHALL BE LIMITED
    27  TO DETERMINING WHETHER ANY SUCH DECISION WAS ARBITRARY AND
    28  CAPRICIOUS.
    29  SECTION 313.  PENALTIES.
    30     (A)  VIOLATIONS OF ACT.--ANY PERSON WHO SHALL VIOLATE ANY OF
    19770H0552B1775                 - 58 -

     1  THE PROVISIONS OF THIS ACT, OR THE RULES AND REGULATIONS OR THE
     2  ORDERS FOR THE ENFORCEMENT OF THE SAID PROVISIONS OR RULES AND
     3  REGULATIONS ISSUED BY DULY AUTHORIZED OFFICERS OF THE DEPARTMENT
     4  OR WHO SHALL HINDER, DELAY OR INTERFERE WITH ANY OFFICER CHARGED
     5  WITH THE ENFORCEMENT OF THIS ACT IN THE PERFORMANCE OF HIS DUTY,
     6  SHALL, UPON CONVICTION THEREOF, BE PUNISHED BY A FINE OF $300
     7  AND COSTS, OR NOT MORE THAN THREE MONTHS IMPRISONMENT IN THE
     8  COUNTY JAIL, OR EITHER, OR BOTH, IN THE DISCRETION OF THE COURT.
     9     (B)  REFUSAL TO VACATE.--ANY PERSON WHO SHALL FAIL OR REFUSE
    10  TO VACATE A BUILDING OR PORTION OF A BUILDING, OR WHO SHALL FAIL
    11  TO VACATE OR PLACE OUT OF SERVICE ANY BUILDING, AFTER DUE NOTICE
    12  HAVING BEEN SERVED UPON HIM BY AN OFFICER OF THE DEPARTMENT AND
    13  PROPER NOTICE HAVING BEEN PLACED UPON THE BUILDING OR STRUCTURE
    14  BY SUCH OFFICER, SHALL BE LIABLE FOR A PENALTY OF $100 A DAY FOR
    15  EACH DAY HE SHALL HAVE SO FAILED OR REFUSED TO VACATE, OR PLACE
    16  OUT OF SERVICE THE BUILDING, PORTION OF BUILDING UPON WHICH SUCH
    17  NOTICE HAS BEEN PLACED, THE SAID PENALTY TO BE COLLECTIBLE IN
    18  THE SAME MANNER AS ANY FINE PAYABLE TO THE COMMONWEALTH.
    19     (C)  INSTITUTION OF PROCEEDINGS.--PROSECUTIONS FOR VIOLATIONS
    20  OF THIS ACT, OR THE RULES AND REGULATIONS OF THE DEPARTMENT MAY
    21  BE INSTITUTED BY THE SECRETARY OF LABOR AND INDUSTRY, OR UNDER
    22  HIS DIRECTIONS BY AN AUTHORIZED REPRESENTATIVE OF THE
    23  DEPARTMENT. UPON CONVICTION AFTER A HEARING THE SENTENCES
    24  PROVIDED IN THIS ACT SHALL BE IMPOSED, AND SHALL BE FINAL UNLESS
    25  AN APPEAL BE TAKEN IN THE MANNER PRESCRIBED BY LAW.
    26     (D)  DISPOSITION OF FINES.--ALL FINES COLLECTED UNDER THIS
    27  ACT SHALL BE FORWARDED TO THE DEPARTMENT WHO SHALL PAY THE SAME
    28  INTO THE STATE TREASURY FOR THE USE OF THE COMMONWEALTH.
    29     (E)  FALSE CERTIFICATION.--ANY ARCHITECT WHO WILLFULLY
    30  PROVIDES A FALSE CERTIFICATION FOR ANY BUILDING SUBJECT TO THE
    19770H0552B1775                 - 59 -

     1  PROVISIONS OF THIS ACT SHALL BE SUBJECT TO THE SUSPENSION OR
     2  REVOCATION OF HIS LICENSE BY THE STATE BOARD OF EXAMINERS OF
     3  ARCHITECTS.
     4  SECTION 314.  ENFORCEMENT.
     5     (A)  APPLICABILITY.--THE PROVISIONS OF THIS ACT SHALL APPLY
     6  TO EVERY BUILDING ENUMERATED IN THIS ACT, EXCEPT BUILDINGS OWNED
     7  BY THE FEDERAL GOVERNMENT, INCLUDING BUILDINGS OWNED IN WHOLE OR
     8  IN PART BY THE COMMONWEALTH OR ANY POLITICAL SUBDIVISION
     9  THEREOF, AND SHALL BE ENFORCED BY THE SECRETARY OF LABOR AND
    10  INDUSTRY, BY AND THROUGH HIS AUTHORIZED REPRESENTATIVES.
    11     (B)  POWERS OF OFFICERS.--FOR THE PURPOSE OF ENFORCING THE
    12  PROVISIONS OF THIS ACT, ALL THE OFFICERS CHARGED WITH ITS
    13  ENFORCEMENT SHALL HAVE THE POWER TO ENTER ANY OF THE BUILDINGS
    14  ENUMERATED IN THIS ACT, AND NO PERSON SHALL HINDER OR DELAY, OR
    15  INTERFERE WITH ANY OF THE SAID OFFICERS IN THE PERFORMANCE OF
    16  HIS DUTY, NOR REFUSE ANY PERTINENT INFORMATION NECESSARY TO
    17  DETERMINE WHETHER THE PROVISIONS OF THIS ACT AND THE RULES AND
    18  REGULATIONS HEREIN PROVIDED FOR, ARE OR WILL BE COMPLIED WITH.
    19  SECTION 315.  EFFECTIVE DATE.
    20     THIS ACT SHALL TAKE EFFECT AS FOLLOWS:
    21         (1)  CHAPTER 2 SHALL TAKE EFFECT IN SIX MONTHS.
    22         (2)  ALL OTHER PROVISIONS OF THIS ACT SHALL TAKE EFFECT
    23     IMMEDIATELY.





    B10L42JLW/19770H0552B1775       - 60 -