CORRECTIVE REPRINT
HOUSE AMENDED
PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256, 1319 | PRINTER'S NO. 1329 |
THE GENERAL ASSEMBLY OF PENNSYLVANIA
SENATE BILL
No. | 680 | Session of 2013 |
INTRODUCED BY CORMAN, HUGHES, PILEGGI AND SCARNATI, MARCH 13, 2013
AS RE-REPORTED FROM COMMITTEE ON APPROPRIATIONS, HOUSE OF REPRESENTATIVES, AS AMENDED, JUNE 29, 2013
AN ACT
1Providing for the capital budget for the fiscal year <-2012-2013
<-22013-2014; itemizing public improvement projects, furniture
3and equipment projects, transportation assistance projects,
4redevelopment assistance capital projects, flood control
5projects, Keystone Recreation, Park and Conservation Fund
6projects, State forestry bridge projects, State
7ATV/Snowmobile Fund projects, Pennsylvania Fish and Boat
8Commission projects, Manufacturing Fund projects, Oil and Gas
9Lease Fund projects <-and, Environmental Stewardship Fund
10projects <-and highway bridge projects to be constructed or
11acquired or assisted by the Department of General Services,
12the Department of Community and Economic Development, the
13Department of Conservation and Natural Resources, the
14Department of Environmental Protection, the Department of
15Transportation or the Pennsylvania Fish and Boat Commission,
16together with their estimated financial costs; authorizing
17the incurring of debt without the approval of the electors
18for the purpose of financing the projects to be constructed,
19acquired or assisted by the Department of General Services,
20the Department of Community and Economic Development, the
21Department of Conservation and Natural Resources, the
22Department of Environmental Protection, the Department of
23Transportation or the Pennsylvania Fish and Boat Commission;
24stating the estimated useful life of the projects; and making
25appropriations.
26The General Assembly of the Commonwealth of Pennsylvania
27hereby enacts as follows:
1Section 1. Short title.
2This act shall be known and may be cited as the Capital
3Budget Project Itemization Act of <-2012-2013 2013-2014.
4Section 2. Total authorizations.
5(a) Public improvements.--The total authorization for the
6additional capital projects in the category of public
7improvement projects itemized in section 3 and to be acquired or
8constructed by the Department of General Services, its
9successors or assigns, and to be financed by the incurring of
10debt, shall be <-$3,572,285,000 $3,897,449,000 $3,977,449,000.
11(b) Furniture and equipment.--The total authorization for
12the additional capital projects in the category of public
13improvement projects consisting of the acquisition of original
14movable furniture and equipment to complete public improvement
15projects itemized in section 4 and to be acquired by the
16Department of General Services, its successors or assigns, and
17to be financed by the incurring of debt, shall be $137,620,000<-
18$138,120,000 $150,120,000<-.
19(c) Transportation assistance.--The total authorization for
20the capital projects in the category of transportation
21assistance projects itemized in section 5 with respect to which
22an interest is to be acquired in or constructed by the
23Department of Transportation, its successors or assigns, and to
24be financed by the incurring of debt, shall be $1,718,429,000<-
<-25$1,823,639,000 $1,846,939,000.
26(d) Redevelopment assistance.--The total authorization for
27the capital projects in the category of redevelopment assistance
28capital projects itemized in section 6 for capital grants by the
29Department of Community and Economic Development, its successors
30or assigns, and to be financed by the incurring of debt, shall
1be <-$3,965,614,000 $6,077,447,000 $6,438,618,000.
2(e) Flood control.--The total authorization for the capital
3projects in the category of flood control projects itemized in
4section 7 and to be constructed by the Department of
5Environmental Protection, its successors or assigns, and to be
6financed by the incurring of debt, shall be $78,702,000<-
<-7$127,852,000 $137,852,000.
8(f) Keystone Recreation, Park and Conservation Fund.--The
9total authorization for the capital projects in the category of
10public improvement projects itemized in section 8 and to be
11constructed by the Department of Conservation and Natural
12Resources, its successors or assigns, and to be financed from
13current revenues in the Keystone Recreation, Park and
14Conservation Fund, shall be $59,202,000.
15(g) State forestry bridge projects.--The total authorization
16for the capital projects itemized in section 9 to be constructed
17by the Department of Conservation and Natural Resources, its
18successors or assigns, and to be financed by oil company
19franchise tax revenues pursuant to 75 Pa.C.S. § 9502(a)(2)(iv)
20(relating to imposition of tax), shall be $25,155,000.
21(h) State ATV/snowmobile projects.--The total authorization
22for the capital projects itemized in section 10 to be
23constructed by the Department of Conservation and Natural
24Resources, its successors or assigns, and to be financed from
25current revenues in the State ATV/Snowmobile Fund, shall be
26$250,000.
27(i) Fish Fund and Boat Fund projects.--The total
28authorization for the capital projects in the category of public
29improvement projects itemized in section 11 to be acquired or
30developed by the Pennsylvania Fish and Boat Commission and to be
1financed by the incurring of debt or by current revenues of the
2Fish Fund and the Boat Fund pursuant to executive authorization
3shall be $128,741,000.
4(j) Manufacturing Fund current revenue projects.--The total
5authorization for the capital projects in the category of public
6improvement projects itemized in section 12 and to be
7constructed by the Department of General Services, its
8successors or assigns, and to be financed from current revenues
9in the Manufacturing Fund, shall be $7,500,000.
10(k) Oil and Gas Lease Fund current revenue projects.--The
11total authorization for the capital projects in the category of
12public improvement projects itemized in section 13 to be
13acquired or developed by the Department of Conservation and
14Natural Resources and to be financed by current revenues of the
15Oil and Gas Lease Fund pursuant to executive authorization shall
16be $698,000.
17(l) Environmental Stewardship Fund current revenue
18projects.--The total authorization for the capital projects in
19the category of public improvement projects itemized in section
2014 to be acquired or developed by the Department of Conservation
21and Natural Resources and to be financed by current revenues of
22the Environmental Stewardship Fund pursuant to executive
23authorization shall be $900,000.
<-24(m) Highway bridge projects.--The total authorization for
25capital projects in the category of highway bridge projects
26itemized in section 15 to be constructed by the Department of
27Transportation, its successors or assigns, and to be financed by
28the incurring of debt or from current revenue shall be $190,000.
29As used in this subsection, the term "capital project" shall
30mean a capital project as defined in section 302 of the act of
1February 9, 1999 (P.L.1, No.1), known as the Capital Facilities
2Debt Enabling Act, and shall include a county or municipal
3bridge rehabilitation, replacement or improvement project as set
4forth in section 15.
5Section 3. Itemization of public improvement capital projects.
6(a) General rule.--Additional capital projects in the
7category of public improvement projects to be constructed or
8acquired by the Department of General Services, its successors
9or assigns, and to be financed by the incurring of debt, are
10hereby itemized, together with their respective estimated
11financial costs, as follows:
13Project | Total Project Allocation | |||||
14(1) Department of Agriculture |
| |||||
15(i) Farm Show Complex |
| |||||
16(A) Upgrade Farm Show Complex, including |
| |||||
19Project Allocation | 3,000,000 | |||||
20(Base Project Allocation - $3,000,000) |
| |||||
| ||||||
| ||||||
25Project Allocation | 2,000,000 | |||||
26(Base Project Allocation - $2,000,000) |
| |||||
27(C) Construct new parking garage to |
| |||||
30Project Allocation | 10,000,000 | |||||
| ||||||
3(ii) Health Diagnostic Laboratory |
| |||||
4(A) Construct new plant industry |
| |||||
7Project Allocation | 10,000,000 | |||||
| ||||||
10(B) Construct new Pennsylvania Equine |
| |||||
14Project Allocation | 7,000,000 | |||||
15(Base Project Allocation - $7,000,000) |
| |||||
| ||||||
18(i) Bald Eagle State Forest |
| |||||
19(A) Repair roadways, including drainage |
| |||||
21Project Allocation | 960,000 | |||||
22(Base Project Allocation - $800,000) |
| |||||
23(Design & Contingencies - $160,000) |
| |||||
24(i.1) Bald Eagle State Park |
| |||||
25(A) Construct an addition to the park |
| |||||
27Project Allocation | 4,080,000 | |||||
28(Base Project Allocation - $3,400,000) |
| |||||
29(Design & Contingencies - $680,000) |
| |||||
30(i.2) Black Moshannon State Park |
| |||||
1(A) Develop ten additional family cabins |
| |||||
4Project Allocation | 3,000,000 | |||||
5(Base Project Allocation - $2,400,000) |
| |||||
6(Design & Contingencies - $600,000) |
| |||||
7(ii) Blue Knob State Park |
| |||||
8(A) Replace two office buildings and |
| |||||
11Project Allocation | 2,400,000 | |||||
12(Base Project Allocation - $2,400,000) |
| |||||
13(ii.1) Buchanan State Forest |
| |||||
| ||||||
16Project Allocation | 3,000,000 | |||||
17(Base Project Allocation - $2,500,000) |
| |||||
18(Design & Contingencies - $500,000) |
| |||||
19(iii) Caledonia State Park |
| |||||
20(A) Rehabilitate campground restrooms and |
| |||||
22Project Allocation | 3,000,000 | |||||
23(Base Project Allocation - $3,000,000) |
| |||||
24(B) Replace water lines throughout park |
| |||||
25Project Allocation | 900,000 | |||||
26(Base Project Allocation - $900,000) |
| |||||
27(iv) Cherry Springs State Park |
| |||||
28(A) Construct visitors and administrative |
| |||||
1Project Allocation | 8,000,000 | |||||
2(Base Project Allocation - $8,000,000) |
| |||||
3(v) Codorus State Park |
| |||||
4(A) Rehabilitate and pave roads and |
| |||||
6Project Allocation | 2,400,000 | |||||
7(Base Project Allocation - $2,400,000) |
| |||||
8(B) Rehabilitate and pave roads and |
| |||||
10Project Allocation | 2,400,000 | |||||
11(Base Project Allocation - $2,400,000) |
| |||||
12(vi) Colonel Denning State Park |
| |||||
13(A) Replace pit restroom, add sewer lines |
| |||||
16Project Allocation | 1,800,000 | |||||
17(Base Project Allocation - $1,800,000) |
| |||||
18(vii) Cowans Gap State Park |
| |||||
19(A) Construct park office addition and |
| |||||
21Project Allocation | 1,200,000 | |||||
22(Base Project Allocation - $1,200,000) |
| |||||
23(viii) Delaware Canal State Park |
| |||||
24(A) Provide for repair and ongoing |
| |||||
26Project Allocation | 10,000,000 | |||||
| ||||||
29(B) Replacement of 12 adjacent box beam |
| |||||
1Project Allocation | 16,200,000 | |||||
| ||||||
4(Design & Contingencies - $2,700,000) |
| |||||
5(C) Construct a new resource center with |
| |||||
7Project Allocation | 3,300,000 | |||||
8(Base Project Allocation - $2,750,000) |
| |||||
9(Design & Contingencies - $550,000) |
| |||||
10(D) Rehabilitate Pecks Pond Dam |
| |||||
11Project Allocation | 7,200,000 | |||||
12(Base Project Allocation - $6,000,000) |
| |||||
13(Design & Contingencies - $1,200,000) |
| |||||
<-14(E) Construction, infrastructure, |
| |||||
19Project Allocation | 5,000,000 | |||||
20(Base Project Allocation - $5,000,000) |
| |||||
21(viii.1) Delaware State Forest |
| |||||
22(A) Construct a new resource center with |
| |||||
24Project Allocation | 8,400,000 | |||||
25(Base Project Allocation - $7,000,000) |
| |||||
26(Design & Contingencies - $1,400,000) |
| |||||
27(ix) Denton Hill State Park |
| |||||
28(A) Rehabilitate park, including ski
1cabins and maintenance facilities for |
| |||||
3Project Allocation | 12,000,000 | |||||
| ||||||
6(ix.1) Forbes State Forest |
| |||||
7(A) Remediate three acid mines |
| |||||
9Project Allocation | 1,800,000 | |||||
10(Base Project Allocation - $1,500,000) |
| |||||
11(Design & Contingencies - $300,000) |
| |||||
12(x) Forest District 10 |
| |||||
13(A) Replace failed acid mine drainage |
| |||||
16Project Allocation | 2,000,000 | |||||
17(Base Project Allocation - $2,000,000) |
| |||||
18(xi) Forest District 11 |
| |||||
19(A) Construct bridge over Lehigh River to |
| |||||
24Project Allocation | 3,500,000 | |||||
25(Base Project Allocation - $3,500,000) |
| |||||
26(xii) Forest District 12 |
| |||||
27(A) Construct bridge over Slate Run |
| |||||
28Project Allocation | 1,000,000 | |||||
29(Base Project Allocation - $1,000,000) |
| |||||
30(B) Demolish old building and build
1public restrooms and contact station |
| |||||
3Project Allocation | 4,500,000 | |||||
4(Base Project Allocation - $4,500,000) |
| |||||
5(xiii) Forest District 13 |
| |||||
6(A) Remediate and reclaim acid mine |
| |||||
10Project Allocation | 8,000,000 | |||||
11(Base Project Allocation - $8,000,000) |
| |||||
12(xiv) Forest District 14 |
| |||||
13(A) Locate, plug and retire abandoned oil |
| |||||
15Project Allocation | 2,000,000 | |||||
16(Base Project Allocation - $2,000,000) |
| |||||
17(xv) Gifford Pinchot State Park |
| |||||
18(A) Replace water lines which are in |
| |||||
20Project Allocation | 1,560,000 | |||||
21(Base Project Allocation - $1,560,000) |
| |||||
22(B) Repave main road, including drainage |
| |||||
23Project Allocation | 780,000 | |||||
24(xvi) Greenwood Furnace State Park |
| |||||
25(A) Construct new maintenance building to |
| |||||
27Project Allocation | 1,800,000 | |||||
28(Base Project Allocation - $1,800,000) |
| |||||
29(xvii) Hickory Run State Park |
| |||||
30(A) Construct new visitors center with
1administration facilities and comfort |
| |||||
3Project Allocation | 7,500,000 | |||||
4(Base Project Allocation - $7,500,000) |
| |||||
| ||||||
7Project Allocation | 3,000,000 | |||||
8(Base Project Allocation - $3,000,000) |
| |||||
9(C) Rehabilitate and upgrade office to |
| |||||
11Project Allocation | 8,000,000 | |||||
12(Base Project Allocation - $8,000,000) |
| |||||
13(xviii) Kettle Creek State Park |
| |||||
14(A) Dredge lake and provide for improved |
| |||||
17Project Allocation | 2,000,000 | |||||
18(Base Project Allocation - $1,600,000) |
| |||||
19(Design & Contingencies - $400,000) |
| |||||
20(xviii.1) Kinzua Bridge State Park |
| |||||
21(A) Additional funds for DGS project 130- |
| |||||
30Project Allocation | 3,000,000 | |||||
1(Base Project Allocation - $2,400,000) |
| |||||
2(Design & Contingencies - $600,000) |
| |||||
3(B) Construction of site improvements, |
| |||||
6Project Allocation | 2,000,000 | |||||
7(Base Project Allocation - $1,600,000) |
| |||||
8(Design & Contingencies - $400,000) |
| |||||
9(xviii.2) Kittanning State Forest |
| |||||
10(A) Restore iron furnace |
| |||||
11Project Allocation | 1,600,000 | |||||
12(Base Project Allocation - $1,500,000) |
| |||||
13(Design & Contingencies - $100,000) |
| |||||
14(xviii.3) Lackawanna State Forest |
| |||||
15(A) Breach and remove Olyphant #1 Dam |
| |||||
16Project Allocation | 900,000 | |||||
17(Base Project Allocation - $750,000) |
| |||||
18(Design & Contingencies - $150,000) |
| |||||
19(xix) Lackawanna State Park |
| |||||
20(A) Replace pool |
| |||||
21Project Allocation | 6,000,000 | |||||
22(Base Project Allocation - $4,800,000) |
| |||||
23(Design & Contingencies - $1,200,000) |
| |||||
24(xx) Laurel Mountain State Park |
| |||||
25(A) Develop Phase II of ski area, adding |
| |||||
29Project Allocation | 3,000,000 | |||||
30(Base Project Allocation - $3,000,000) |
| |||||
1(xx.1) Lehigh Gorge State Park |
| |||||
2(A) Rehabilitate White Haven public |
| |||||
6Project Allocation | 4,122,000 | |||||
7(Base Project Allocation - $3,435,000) |
| |||||
8(Design & Contingencies - $687,000) |
| |||||
9(xx.2) Little Buffalo State Park |
| |||||
10(A) Replacement of old cottages |
| |||||
11Project Allocation | 500,000 | |||||
12(Base Project Allocation - $400,000) |
| |||||
13(Design & Contingencies - $100,000) |
| |||||
14(xxi) Maurice K. Goddard State Park |
| |||||
15(A) Replace existing marina facility with |
| |||||
19Project Allocation | 2,400,000 | |||||
20(Base Project Allocation - $2,400,000) |
| |||||
21(xxi.1) Michaux State Forest |
| |||||
22(A) Rehabilitate Old Forge Picnic area, |
| |||||
25Project Allocation | 450,000 | |||||
26(Base Project Allocation - $350,000) |
| |||||
27(Design & Contingencies - $100,000) |
| |||||
28(xxii) Moraine State Park |
| |||||
29(A) Upgrade sewage treatment facilities |
| |||||
30Project Allocation | 5,000,000 | |||||
1(Base Project Allocation - $5,000,000) |
| |||||
2(xxiii) Ohiopyle State Park |
| |||||
3(A) Develop family cabin colony with |
| |||||
6Project Allocation | 3,000,000 | |||||
7(Base Project Allocation - $2,400,000) |
| |||||
8(Design & Contingencies - $600,000) |
| |||||
9(B) Improvements to Ferncliff parking lot |
| |||||
12Project Allocation | 3,600,000 | |||||
13(Base Project Allocation - $3,000,000) |
| |||||
14(Design & Contingencies - $600,000) |
| |||||
15(xxiii.1) Park Region #2 |
| |||||
16(A) Removal of ten underground fuel tanks |
| |||||
19Project Allocation | 3,300,000 | |||||
20(Base Project Allocation - $2,750,000) |
| |||||
21(Design & Contingencies - $550,000) |
| |||||
22(xxiv) Penn Nursery and Woodshop |
| |||||
23(A) Replace outdated maintenance shop to |
| |||||
25Project Allocation | 5,500,000 | |||||
26(Base Project Allocation - $5,500,000) |
| |||||
27(xxiv.1) Pine Grove Furnace State Park |
| |||||
| ||||||
30Project Allocation | 2,040,000 | |||||
1(Base Project Allocation - $1,700,000) |
| |||||
2(Design & Contingencies - $340,000) |
| |||||
3(xxv) Point State Park |
| |||||
4(A) Connect Great Allegheny Passage Trail |
| |||||
8Project Allocation | 9,000,000 | |||||
9(Base Project Allocation - $9,000,000) |
| |||||
10(xxvi) Presque Isle State Park |
| |||||
11(A) Replenish sand to maintain beach |
| |||||
12Project Allocation | 10,000,000 | |||||
| ||||||
15(B) Replace three beach/shower houses, |
| |||||
18Project Allocation | 3,600,000 | |||||
19(Base Project Allocation - $3,600,000) |
| |||||
20(xxvii) Prince Gallitzin State Park |
| |||||
21(A) Replace two pit restrooms with modern |
| |||||
24Project Allocation | 960,000 | |||||
25(Base Project Allocation - $960,000) |
| |||||
26(B) Replace water lines throughout park |
| |||||
27Project Allocation | 3,240,000 | |||||
28(Base Project Allocation - $3,240,000) |
| |||||
| ||||||
1Project Allocation | 2,400,000 | |||||
2(Base Project Allocation - $2,400,000) |
| |||||
3(D) Replacement of six miles of water |
| |||||
5Project Allocation | 5,000,000 | |||||
6(Base Project Allocation - $4,000,000) |
| |||||
7(Design & Contingencies - $1,000,000) |
| |||||
8(xxviii) Pymatuning State Park |
| |||||
9(A) Rehabilitate campground facilities |
| |||||
13Project Allocation | 2,400,000 | |||||
14(Base Project Allocation - $2,400,000) |
| |||||
15(B) Replacement of existing livery docks |
| |||||
17Project Allocation | 3,600,000 | |||||
18(Base Project Allocation - $3,000,000) |
| |||||
19(Design & Contingencies - $600,000) |
| |||||
20(xxix) Ryerson Station State Park |
| |||||
21(A) Rehabilitate dam |
| |||||
22Project Allocation | 5,000,000 | |||||
23(Base Project Allocation - $5,000,000) |
| |||||
24(B) Dredging of sediment in Duke Lake |
| |||||
25Project Allocation | 7,800,000 | |||||
26(Base Project Allocation - $6,500,000) |
| |||||
27(Design & Contingencies - $1,300,000) |
| |||||
28(xxx) Samuel S. Lewis State Park |
| |||||
29(A) Replace pit restroom with modern
1system |
| |||||
2Project Allocation | 1,200,000 | |||||
3(Base Project Allocation - $1,200,000) |
| |||||
4(xxxi) Shawnee State Park |
| |||||
5(A) Replace regional office to meet |
| |||||
8Project Allocation | 3,600,000 | |||||
9(Base Project Allocation - $3,600,000) |
| |||||
10(xxxii) Shikellamy State Park |
| |||||
11(A) Replace dam bags that have reached |
| |||||
13Project Allocation | 4,000,000 | |||||
14(Base Project Allocation - $4,000,000) |
| |||||
15(xxxii.1) Susquehannock State Park |
| |||||
16(A) Rehabilitate entryway from township |
| |||||
18Project Allocation | 360,000 | |||||
19(Base Project Allocation - $300,000) |
| |||||
20(Design & Contingencies - $60,000) |
| |||||
21(xxxii.2) Tioga State Forest |
| |||||
| ||||||
24Project Allocation | 3,600,000 | |||||
25(Base Project Allocation - $3,000,000) |
| |||||
26(Design & Contingencies - $600,000) |
| |||||
27(xxxii.3) Various lakes |
| |||||
28(A) Dredging of various lakes throughout |
| |||||
1Project Allocation | 3,295,000 | |||||
2(Base Project Allocation - $2,746,000) |
| |||||
3(Design & Contingencies - $549,000) |
| |||||
4(xxxiii) Tobyhanna State Park |
| |||||
5(A) Rehabilitate Tobyhanna No. 2 dam |
| |||||
6Project Allocation | 8,500,000 | |||||
7(Base Project Allocation - $7,000,000) |
| |||||
8(Design & Contingencies - $1,500,000) |
| |||||
9(xxxiv) Whipple Dam State Park |
| |||||
10(A) Replace bathhouse with modern |
| |||||
12Project Allocation | 1,800,000 | |||||
13(Base Project Allocation - $1,800,000) |
| |||||
14(xxxv) Various Parks and Forest Districts |
| |||||
15(A) Rehabilitate or replace lookout fire |
| |||||
17Project Allocation | 6,000,000 | |||||
18(Base Project Allocation - $4,800,000) |
| |||||
19(Design & Contingencies - $1,200,000) |
| |||||
20(3) Department of Corrections |
| |||||
21(i) Elizabethtown Training Academy |
| |||||
22(A) Replace domestic and fire water lines |
| |||||
24Project Allocation | 500,000 | |||||
25(Base Project Allocation - $400,000) |
| |||||
26(Design & Contingencies - $100,000) |
| |||||
27(B) Renovate boiler plant, including |
| |||||
29Project Allocation | 3,125,000 | |||||
30(Base Project Allocation - $2,500,000) |
| |||||
1(Design & Contingencies - $625,000) |
| |||||
2(C) Replace current fire alarm system |
| |||||
3Project Allocation | 450,000 | |||||
4(Base Project Allocation - $360,000) |
| |||||
5(Design & Contingencies - $90,000) |
| |||||
| ||||||
| ||||||
10Project Allocation | 1,200,000 | |||||
11(Base Project Allocation - $960,000) |
| |||||
12(Design & Contingencies - $240,000) |
| |||||
| ||||||
15Project Allocation | 900,000 | |||||
16(Base Project Allocation - $720,000) |
| |||||
17(Design & Contingencies - $180,000) |
| |||||
| ||||||
20(A) Replace 5,260 feet of current |
| |||||
24Project Allocation | 1,200,000 | |||||
25(Base Project Allocation - $960,000) |
| |||||
26(Design & Contingencies - $240,000) |
| |||||
27(B) Install perimeter lights around |
| |||||
29Project Allocation | 1,565,000 | |||||
30(Base Project Allocation - $1,252,000) |
| |||||
1(Design & Contingencies - $313,000) |
| |||||
| ||||||
<-4(A) Renovate boiler plant to repair or |
| |||||
<-8(A) Renovate boiler plant to repair or |
| |||||
11Project Allocation | 4,000,000 | |||||
12(Base Project Allocation - $3,200,000) |
| |||||
13(Design & Contingencies - $800,000) |
| |||||
14(B) Renovate kitchen No. 2 |
| |||||
15Project Allocation | 12,500,000 | |||||
| ||||||
18(Design & Contingencies - $2,500,000) |
| |||||
19(C) Demolish housing units A, B, C and D |
| |||||
21Project Allocation | 81,000,000 | |||||
| ||||||
24(Design & Contingencies - $16,200,000) |
| |||||
| ||||||
| ||||||
29Project Allocation | 7,000,000 | |||||
30(Base Project Allocation - $5,600,000) |
| |||||
1(Design & Contingencies - $1,400,000) |
| |||||
2(v) State Correctional Institution at Coal |
| |||||
| ||||||
5Project Allocation | 3,500,000 | |||||
6(Base Project Allocation - $2,800,000) |
| |||||
7(Design & Contingencies - $700,000) |
| |||||
8(vi) State Correctional Institution at Dallas |
| |||||
9(A) Expand existing visiting room with |
| |||||
13Project Allocation | 400,000 | |||||
14(Base Project Allocation - $320,000) |
| |||||
15(Design & Contingencies - $80,000) |
| |||||
16(B) Additional funding to upgrade storm |
| |||||
18Project Allocation | 4,000,000 | |||||
19(Base Project Allocation - $3,200,000) |
| |||||
20(Design & Contingencies - $800,000) |
| |||||
| ||||||
23(A) Upgrade security system, including |
| |||||
27Project Allocation | 1,300,000 | |||||
28(Base Project Allocation - $1,040,000) |
| |||||
29(Design & Contingencies - $260,000) |
| |||||
30(viii) State Correctional Institution at
1Forest |
| |||||
2(A) Replace 5,300 feet of current |
| |||||
6Project Allocation | 1,430,000 | |||||
7(Base Project Allocation - $1,144,000) |
| |||||
8(Design & Contingencies - $286,000) |
| |||||
9(B) Repair or replace the HTHW (High |
| |||||
12Project Allocation | 4,000,000 | |||||
13(Base Project Allocation - $3,200,000) |
| |||||
14(Design & Contingencies - $800,000) |
| |||||
| ||||||
17Project Allocation | 700,000 | |||||
18(Base Project Allocation - $560,000) |
| |||||
19(Design & Contingencies - $140,000) |
| |||||
| ||||||
22(A) Replace 5,300 feet of current |
| |||||
26Project Allocation | 1,200,000 | |||||
27(Base Project Allocation - $960,000) |
| |||||
28(Design & Contingencies - $240,000) |
| |||||
29(B) Remove and replace EPDM roofing and
1Industries and maintenance buildings |
| |||||
2Project Allocation | 1,375,000 | |||||
3(Base Project Allocation - $1,100,000) |
| |||||
4(Design & Contingencies - $275,000) |
| |||||
| ||||||
7(A) Replace 4,224 feet of current |
| |||||
11Project Allocation | 750,000 | |||||
12(Base Project Allocation - $600,000) |
| |||||
13(Design & Contingencies - $150,000) |
| |||||
| ||||||
16(A) Replace current microwave security |
| |||||
18Project Allocation | 1,020,000 | |||||
19(Base Project Allocation - $816,000) |
| |||||
20(Design & Contingencies - $204,000) |
| |||||
21(B) Renovate boiler plant equipment, |
| |||||
25Project Allocation | 2,250,000 | |||||
26(Base Project Allocation - $1,800,000) |
| |||||
27(Design & Contingencies - $450,000) |
| |||||
| ||||||
30(A) Replace electrical services to blocks |
| |||||
3Project Allocation | 8,500,000 | |||||
4(Base Project Allocation - $6,800,000) |
| |||||
5(Design & Contingencies - $1,700,000) |
| |||||
| ||||||
8(A) Replace perimeter security detection |
| |||||
12Project Allocation | 2,500,000 | |||||
13(Base Project Allocation - $2,000,000) |
| |||||
14(Design & Contingencies - $500,000) |
| |||||
| ||||||
17(A) Repair deteriorated face block on |
| |||||
20Project Allocation | 15,000,000 | |||||
| ||||||
23(Design & Contingencies - $3,000,000) |
| |||||
24(B) Replace rubber roofing and metal |
| |||||
26Project Allocation | 3,800,000 | |||||
27(Base Project Allocation - $3,040,000) |
| |||||
28(Design & Contingencies - $760,000) |
| |||||
| ||||||
1Project Allocation | 425,000 | |||||
2(Base Project Allocation - $340,000) |
| |||||
3(Design & Contingencies - $85,000) |
| |||||
4(D) Replace block walls surrounding Level |
| |||||
8Project Allocation | 500,000 | |||||
9(Base Project Allocation - $400,000) |
| |||||
10(Design & Contingencies - $100,000) |
| |||||
11(E) Expand parking and repave access |
| |||||
13Project Allocation | 800,000 | |||||
14(Base Project Allocation - $640,000) |
| |||||
15(Design & Contingencies - $160,000) |
| |||||
16(xv) State Correctional Institution at Mercer |
| |||||
| ||||||
19Project Allocation | 750,000 | |||||
20(Base Project Allocation - $600,000) |
| |||||
21(Design & Contingencies - $150,000) |
| |||||
22(B) Repave existing perimeter road and |
| |||||
25Project Allocation | 458,000 | |||||
26(Base Project Allocation - $366,000) |
| |||||
27(Design & Contingencies - $92,000) |
| |||||
| ||||||
30Project Allocation | 1,600,000 | |||||
1(Base Project Allocation - $1,280,000) |
| |||||
2(Design & Contingencies - $320,000) |
| |||||
3(D) Upgrade electrical panels, switches |
| |||||
5Project Allocation | 600,000 | |||||
6(Base Project Allocation - $480,000) |
| |||||
7(Design & Contingencies - $120,000) |
| |||||
8(xvi) State Correctional Institution at Muncy |
| |||||
9(A) Install new 1,000,000-gallon water |
| |||||
12Project Allocation | 3,000,000 | |||||
13(Base Project Allocation - $2,400,000) |
| |||||
14(Design & Contingencies - $600,000) |
| |||||
15(B) Expand existing visiting room with |
| |||||
19Project Allocation | 5,300,000 | |||||
20(Base Project Allocation - $4,240,000) |
| |||||
21(Design & Contingencies - $1,060,000) |
| |||||
22(C) Replace 6,340 feet of current |
| |||||
26Project Allocation | 1,430,000 | |||||
27(Base Project Allocation - $1,144,000) |
| |||||
28(Design & Contingencies - $286,000) |
| |||||
29(D) Replace existing sewer lines which
1infiltration |
| |||||
2Project Allocation | 1,875,000 | |||||
3(Base Project Allocation - $1,500,000) |
| |||||
4(Design & Contingencies - $375,000) |
| |||||
5(E) Construct new admissions building and |
| |||||
7Project Allocation | 625,000 | |||||
8(Base Project Allocation - $500,000) |
| |||||
9(Design & Contingencies - $125,000) |
| |||||
10(F) Expand parking lot and repave access |
| |||||
12Project Allocation | 1,800,000 | |||||
13(Base Project Allocation - $1,440,000) |
| |||||
14(Design & Contingencies - $360,000) |
| |||||
15(G) Replace existing modular housing unit |
| |||||
17Project Allocation | 1,250,000 | |||||
18(Base Project Allocation - $1,000,000) |
| |||||
19(Design & Contingencies - $250,000) |
| |||||
20(H) Construct new treatment center |
| |||||
21Project Allocation | 3,125,000 | |||||
22(Base Project Allocation - $2,500,000) |
| |||||
23(Design & Contingencies - $625,000) |
| |||||
24(I) Renovate housing units, including ADA |
| |||||
28Project Allocation | 12,500,000 | |||||
| ||||||
1(Design & Contingencies - $2,500,000) |
| |||||
| ||||||
4(A) Replace 5,310 feet of current |
| |||||
8Project Allocation | 2,000,000 | |||||
9(Base Project Allocation - $1,600,000) |
| |||||
10(Design & Contingencies - $400,000) |
| |||||
11(B) Expand and renovate main control room |
| |||||
12Project Allocation | 680,000 | |||||
13(Base Project Allocation - $544,000) |
| |||||
14(Design & Contingencies - $136,000) |
| |||||
| ||||||
17(A) Replace 5,520 feet of current |
| |||||
21Project Allocation | 1,200,000 | |||||
22(Base Project Allocation - $960,000) |
| |||||
23(Design & Contingencies - $240,000) |
| |||||
24(B) Replace leaking steam and condensate |
| |||||
27Project Allocation | 565,000 | |||||
28(Base Project Allocation - $452,000) |
| |||||
29(Design & Contingencies - $113,000) |
| |||||
30(xix) State Correctional Institution at
1Rockview |
| |||||
| ||||||
4Project Allocation | 2,400,000 | |||||
5(Base Project Allocation - $1,920,000) |
| |||||
6(Design & Contingencies - $480,000) |
| |||||
| ||||||
9Project Allocation | 1,440,000 | |||||
10(Base Project Allocation - $1,152,000) |
| |||||
11(Design & Contingencies - $288,000) |
| |||||
12(C) Replace windows in treatment building |
| |||||
13Project Allocation | 2,400,000 | |||||
14(Base Project Allocation - $1,920,000) |
| |||||
15(Design & Contingencies - $480,000) |
| |||||
16(D) Additional funds for DGS Project 571- |
| |||||
19Project Allocation | 3,518,000 | |||||
20(Base Project Allocation - $2,814,000) |
| |||||
21(Design & Contingencies - $704,000) |
| |||||
22(E) Renovate boiler plant ash handling |
| |||||
24Project Allocation | 625,000 | |||||
25(Base Project Allocation - $500,000) |
| |||||
26(Design & Contingencies - $125,000) |
| |||||
27(F) Renovate exterior of main dining hall |
| |||||
1Project Allocation | 2,000,000 | |||||
2(Base Project Allocation - $1,600,000) |
| |||||
3(Design & Contingencies - $400,000) |
| |||||
4(G) Renovate exterior of deputy warden's |
| |||||
8Project Allocation | 1,000,000 | |||||
9(Base Project Allocation - $800,000) |
| |||||
10(Design & Contingencies - $200,000) |
| |||||
11(H) Expand parking and repave access |
| |||||
13Project Allocation | 800,000 | |||||
14(Base Project Allocation - $640,000) |
| |||||
15(Design & Contingencies - $160,000) |
| |||||
| ||||||
18(A) Renovate boilers and equipment, |
| |||||
21Project Allocation | 3,500,000 | |||||
22(Base Project Allocation - $2,800,000) |
| |||||
23(Design & Contingencies - $700,000) |
| |||||
| ||||||
26(A) Renovate 480-volt distribution |
| |||||
29Project Allocation | 432,000 | |||||
30(Base Project Allocation - $346,000) |
| |||||
1(Design & Contingencies - $86,000) |
| |||||
2(B) Replace existing digital management |
| |||||
4Project Allocation | 420,000 | |||||
5(Base Project Allocation - $336,000) |
| |||||
6(Design & Contingencies - $84,000) |
| |||||
7(C) Replace roof on Correctional |
| |||||
9Project Allocation | 910,000 | |||||
10(Base Project Allocation - $728,000) |
| |||||
11(Design & Contingencies - $182,000) |
| |||||
12(D) Replace proximity card access system |
| |||||
15Project Allocation | 625,000 | |||||
16(Base Project Allocation - $500,000) |
| |||||
17(Design & Contingencies - $125,000) |
| |||||
18(E) Replace rooftop heating and cooling |
| |||||
20Project Allocation | 775,000 | |||||
21(Base Project Allocation - $620,000) |
| |||||
22(Design & Contingencies - $155,000) |
| |||||
| ||||||
25Project Allocation | 500,000 | |||||
26(Base Project Allocation - $500,000) |
| |||||
| ||||||
29(A) Repoint exterior building masonry and
1throughout institution |
| |||||
2Project Allocation | 3,420,000 | |||||
3(Base Project Allocation - $2,736,000) |
| |||||
4(Design & Contingencies - $684,000) |
| |||||
5(B) Demolish J-Ward and repair corridor |
| |||||
8Project Allocation | 840,000 | |||||
9(Base Project Allocation - $672,000) |
| |||||
10(Design & Contingencies - $168,000) |
| |||||
11(C) Renovate and expand existing dining |
| |||||
13Project Allocation | 3,300,000 | |||||
14(Base Project Allocation - $2,640,000) |
| |||||
15(Design & Contingencies - $660,000) |
| |||||
16(D) Construct a new education building |
| |||||
17Project Allocation | 4,600,000 | |||||
18(Base Project Allocation - $3,680,000) |
| |||||
19(Design & Contingencies - $920,000) |
| |||||
20(E) Expand parking and repave access |
| |||||
22Project Allocation | 1,750,000 | |||||
23(Base Project Allocation - $1,400,000) |
| |||||
24(Design & Contingencies - $350,000) |
| |||||
25(F) Additional funding to renovate boiler |
| |||||
27Project Allocation | 4,260,000 | |||||
28(Base Project Allocation - $3,408,000) |
| |||||
29(Design & Contingencies - $852,000) |
| |||||
30(G) Renovate and expand A block housing
1unit |
| |||||
2Project Allocation | 2,500,000 | |||||
3(Base Project Allocation - $2,000,000) |
| |||||
4(Design & Contingencies - $500,000) |
| |||||
| ||||||
7(A) Replace door control systems and |
| |||||
10Project Allocation | 9,000,000 | |||||
11(Base Project Allocation - $7,200,000) |
| |||||
12(Design & Contingencies - $1,800,000) |
| |||||
13(4) Department of Education |
| |||||
14(i) Department of Education Headquarters |
| |||||
15(A) Renovate two floors of Department of |
| |||||
18Project Allocation | 1,000,000 | |||||
19(Base Project Allocation - $1,000,000) |
| |||||
20(ii) Delaware County Community College |
| |||||
21(A) Construction, infrastructure and |
| |||||
25Project Allocation | 2,400,000 | |||||
26(Base Project Allocation - $2,000,000) |
| |||||
27(Design & Contingencies - $400,000) |
| |||||
28(iii) Lehigh Carbon Community College |
| |||||
29(A) Site development, infrastructure,
1costs related to construction of an |
| |||||
3Project Allocation | 4,800,000 | |||||
4(Base Project Allocation - $4,000,000) |
| |||||
5(Design & Contingencies - $800,000) |
| |||||
6(iv) Lincoln University |
| |||||
7(A) Additional funds for DGS Project No. |
| |||||
12Project Allocation | 20,000,000 | |||||
| ||||||
15(Design & Contingencies - $4,000,000) |
| |||||
16(B) Provide for new construction and |
| |||||
21Project Allocation | 25,000,000 | |||||
| ||||||
24(Design & Contingencies - $5,000,000) |
| |||||
25(C) Renovate and expand Alumni House |
| |||||
26Project Allocation | 20,000,000 | |||||
| ||||||
29(Design & Contingencies - $4,000,000) |
| |||||
30(v) Pennsylvania Highlands Community College |
| |||||
1(A) Acquisition, construction, |
| |||||
6Project Allocation | 600,000 | |||||
7(Base Project Allocation - $500,000) |
| |||||
8(Design & Contingencies - $100,000) |
| |||||
9(vi) Community College of Philadelphia |
| |||||
10(A) Renovation of biology labs and |
| |||||
13Project Allocation | 4,800,000 | |||||
14(Base Project Allocation - $4,000,000) |
| |||||
15(Design & Contingencies - $800,000) |
| |||||
16(vi.1) Reading Area Community College |
| |||||
17(A) Construction, infrastructure |
| |||||
22Project Allocation | 1,167,000 | |||||
23(Base Project Allocation - $1,167,000) |
| |||||
24(B) Construction, infrastructure |
| |||||
29Project Allocation | 2,356,000 | |||||
30(Base Project Allocation - $2,356,000) |
| |||||
1(vii) Temple University |
| |||||
2(A) Renovate and modernize existing |
| |||||
4Project Allocation | 4,500,000 | |||||
5(Base Project Allocation - $3,600,000) |
| |||||
6(Design & Contingencies - $900,000) |
| |||||
7(B) Renovate and construct an addition to |
| |||||
10Project Allocation | 2,700,000 | |||||
11(Base Project Allocation - $2,400,000) |
| |||||
12(Design & Contingencies - $300,000) |
| |||||
13(C) Renovate Paley Library |
| |||||
14Project Allocation | 90,000,000 | |||||
| ||||||
17(D) Renovate Old Dental School |
| |||||
18Project Allocation | 75,000,000 | |||||
| ||||||
21(E) Renovate and expand law school |
| |||||
22Project Allocation | 60,000,000 | |||||
| ||||||
25(F) Renovate and construct addition to |
| |||||
27Project Allocation | 100,000,000 | |||||
| ||||||
30(G) Demolition of Barton Hall and
1construct campus quad, Main Campus |
| |||||
2Project Allocation | 10,000,000 | |||||
| ||||||
| ||||||
7Project Allocation | 35,000,000 | |||||
| ||||||
10(I) Acquisition, infrastructure, |
| |||||
16Project Allocation | 20,000,000 | |||||
| ||||||
<-19(J) Construction, infrastructure and |
| |||||
24Project Allocation | 130,000,000 | |||||
| ||||||
27(viii) Thaddeus Stevens College of Technology |
| |||||
28(A) Upgrade and rehabilitate college's |
| |||||
1Project Allocation | 3,000,000 | |||||
2(Base Project Allocation - $2,400,000) |
| |||||
3(Design & Contingencies - $600,000) |
| |||||
4(B) Expand dining hall by adding second |
| |||||
7Project Allocation | 5,750,000 | |||||
8(Base Project Allocation - $5,060,000) |
| |||||
9(Design & Contingencies - $690,000) |
| |||||
10(C) Infrastructure, development, design |
| |||||
14Project Allocation | 16,800,000 | |||||
| ||||||
17(Design & Contingencies - $2,800,000) |
| |||||
18(D) Renovate Mellor Classroom and |
| |||||
20Project Allocation | 1,017,000 | |||||
21(Base Project Allocation - $895,000) |
| |||||
22(Design & Contingencies - $122,000) |
| |||||
23(E) Upgrade electrical system campus-wide |
| |||||
24Project Allocation | 2,875,000 | |||||
25(Base Project Allocation - $2,530,000) |
| |||||
26(Design & Contingencies - $345,000) |
| |||||
27(F) Renovate Learning Resource Center to |
| |||||
30Project Allocation | 2,300,000 | |||||
1(Base Project Allocation - $2,018,000) |
| |||||
2(Design & Contingencies - $282,000) |
| |||||
3(G) Upgrade HVAC, including controls in |
| |||||
6Project Allocation | 400,000 | |||||
7(Base Project Allocation - $352,000) |
| |||||
8(Design & Contingencies - $48,000) |
| |||||
9(H) Renovate metal fabrication and |
| |||||
12Project Allocation | 250,000 | |||||
13(Base Project Allocation - $220,000) |
| |||||
14(Design & Contingencies - $30,000) |
| |||||
15(I) Abatement of lead paint and painting |
| |||||
17Project Allocation | 230,000 | |||||
18(Base Project Allocation - $202,000) |
| |||||
19(Design & Contingencies - $28,000) |
| |||||
20(J) Renovate Hartzell Hall to include a |
| |||||
23Project Allocation | 5,000,000 | |||||
24(Base Project Allocation - $4,400,000) |
| |||||
25(Design & Contingencies - $600,000) |
| |||||
26(K) Upgrade IT distribution, including |
| |||||
28Project Allocation | 5,000,000 | |||||
29(Base Project Allocation - $4,400,000) |
| |||||
30(Design & Contingencies - $600,000) |
| |||||
1(ix) The Pennsylvania State University |
| |||||
2(A) Convert existing coal-fired boilers |
| |||||
5Project Allocation | 25,000,000 | |||||
| ||||||
8(Design & Contingencies - $5,000,000) |
| |||||
9(B) Provide for continuation of capital |
| |||||
12Project Allocation | 28,000,000 | |||||
| ||||||
15(C) Design, infrastructure, construction, |
| |||||
21Project Allocation | 54,000,000 | |||||
| ||||||
24(Design & Contingencies - $10,800,000) |
| |||||
25(D) Design, infrastructure, renovations, |
| |||||
3Project Allocation | 10,000,000 | |||||
4(Base Project Allocation - $8,000,000) |
| |||||
5(Design & Contingencies - $2,000,000) |
| |||||
6(E) Design, infrastructure, construction, |
| |||||
13Project Allocation | 25,000,000 | |||||
| ||||||
16(Design & Contingencies - $5,000,000) |
| |||||
17(F) Design, infrastructure, construction, |
| |||||
23Project Allocation | 51,300,000 | |||||
| ||||||
26(Design & Contingencies - $10,260,000) |
| |||||
27(G) Additional funding for renovations,
1construction of new facility |
| |||||
2Project Allocation | 10,000,000 | |||||
| ||||||
5(H) Design, acquisition, infrastructure, |
| |||||
11Project Allocation | 50,000,000 | |||||
| ||||||
14(Design & Contingencies - $10,000,000) |
| |||||
15(I) Additional funding for renovations to |
| |||||
19Project Allocation | 15,000,000 | |||||
| ||||||
22(J) Infrastructure, renovations, |
| |||||
27Project Allocation | 12,000,000 | |||||
28(Base Project Allocation - $9,600,000) |
| |||||
29(Design & Contingencies - $2,400,000) |
| |||||
30(K) Design, infrastructure, construction,
1abatement of hazardous materials, |
| |||||
6Project Allocation | 8,000,000 | |||||
7(Base Project Allocation - $6,400,000) |
| |||||
8(Design & Contingencies - $1,600,000) |
| |||||
9(L) Design, infrastructure, construction, |
| |||||
14Project Allocation | 25,000,000 | |||||
| ||||||
17(Design & Contingencies - $5,000,000) |
| |||||
18(M) Design, infrastructure, construction, |
| |||||
25Project Allocation | 10,500,000 | |||||
26(Base Project Allocation - $8,400,000) |
| |||||
27(Design & Contingencies - $2,100,000) |
| |||||
28(N) Design, infrastructure, construction, |
| |||||
3Project Allocation | 16,000,000 | |||||
| ||||||
6(Design & Contingencies - $3,200,000) |
| |||||
7(O) Design, infrastructure, construction, |
| |||||
13Project Allocation | 45,000,000 | |||||
| ||||||
16(Design & Contingencies - $9,000,000) |
| |||||
17(P) Additional funding for |
| |||||
22Project Allocation | 15,000,000 | |||||
| ||||||
25(Q) Design, infrastructure, construction, |
| |||||
30Project Allocation | 1,200,000 | |||||
1(Base Project Allocation - $1,000,000) |
| |||||
2(Design & Contingencies - $200,000) |
| |||||
3(R) Design, infrastructure, construction |
| |||||
7Project Allocation | 13,200,000 | |||||
| ||||||
10(Design & Contingencies - $2,200,000) |
| |||||
11(S) Design, infrastructure, construction |
| |||||
15Project Allocation | 30,000,000 | |||||
| ||||||
18(Design & Contingencies - $5,000,000) |
| |||||
19(T) Design, infrastructure, construction, |
| |||||
27Project Allocation | 11,000,000 | |||||
28(Base Project Allocation - $8,800,000) |
| |||||
29(Design & Contingencies - $2,200,000) |
| |||||
30(U) Construct new data center at Milton
1S. Hershey Medical Center |
| |||||
2Project Allocation | 24,000,000 | |||||
| ||||||
<-5(V) Design, infrastructure, construction, |
| |||||
12Project Allocation | 100,000,000 | |||||
| ||||||
15(Design & Contingencies - $20,000,000) |
| |||||
16(W) Original furniture and equipment for |
| |||||
19Project Allocation | 15,000,000 | |||||
| ||||||
22(X) Construction, infrastructure and |
| |||||
26Project Allocation | 50,000,000 | |||||
| ||||||
<-29(Y) Design, infrastructure, construction,
1hazardous materials, utility upgrades |
| |||||
4Project Allocation | 80,000,000 | |||||
| ||||||
7(Design & Contingencies - $16,000,000) |
| |||||
8(x) University of Pittsburgh |
| |||||
9(A) Renovate exterior of Hillman Library, |
| |||||
12Project Allocation | 10,000,000 | |||||
13(Base Project Allocation - $8,000,000) |
| |||||
14(Design & Contingencies - $2,000,000) |
| |||||
15(B) Renovate Fitzgerald Fieldhouse to |
| |||||
18Project Allocation | 10,000,000 | |||||
19(Base Project Allocation - $8,000,000) |
| |||||
20(Design & Contingencies - $2,000,000) |
| |||||
| ||||||
23Project Allocation | 40,000,000 | |||||
| ||||||
26(D) Renovate and construct addition to |
| |||||
28Project Allocation | 20,000,000 | |||||
| ||||||
1(E) Renovate Bellefield Hall |
| |||||
2Project Allocation | 15,000,000 | |||||
| ||||||
5(F) Renovate, construct addition and fit- |
| |||||
7Project Allocation | 30,000,000 | |||||
| ||||||
| ||||||
12Project Allocation | 30,000,000 | |||||
| ||||||
15(H) Upgrade to Trees Field |
| |||||
16Project Allocation | 20,000,000 | |||||
| ||||||
| ||||||
21Project Allocation | 20,000,000 | |||||
| ||||||
24(J) Programmatic renovations - Phase III |
| |||||
25Project Allocation | 20,000,000 | |||||
| ||||||
28(5) Department of Environmental Protection |
| |||||
29(i) Allegheny County |
| |||||
30(A) Acquisition, construction,
1infrastructure and other related costs |
| |||||
8Project Allocation | 40,000,000 | |||||
| ||||||
11(B) Construction, infrastructure |
| |||||
17Project Allocation | 25,000,000 | |||||
| ||||||
20(C) Acquisition, construction, |
| |||||
25Project Allocation | 50,000,000 | |||||
| ||||||
28(D) Acquisition, construction,
1flood protection project |
| |||||
2Project Allocation | 1,360,000 | |||||
3(Base Project Allocation - $1,360,000) |
| |||||
4(ii) Cambria County |
| |||||
5(A) Additional funding for DGS Project |
| |||||
11Project Allocation | 1,800,000 | |||||
12(Base Project Allocation - $1,620,000) |
| |||||
13(Design & Contingencies - $180,000) |
| |||||
14(B) Rehabilitate existing flood |
| |||||
19Project Allocation | 1,350,000 | |||||
20(Base Project Allocation - $1,215,000) |
| |||||
21(Design & Contingencies - $135,000) |
| |||||
22(iii) Carbon County |
| |||||
23(A) Provide for complete rehabilitation |
| |||||
27Project Allocation | 3,750,000 | |||||
28(Base Project Allocation - $3,000,000) |
| |||||
29(Design & Contingencies - $750,000) |
| |||||
30(iv) Clearfield County |
| |||||
1(A) Rehabilitate existing flood |
| |||||
6Project Allocation | 1,800,000 | |||||
7(Base Project Allocation - $1,620,000) |
| |||||
8(Design & Contingencies - $180,000) |
| |||||
9(v) Columbia County |
| |||||
10(A) Provide additional funds for flood |
| |||||
15Project Allocation | 10,000,000 | |||||
| ||||||
18(B) Provide for flood protection for the |
| |||||
21Project Allocation | 70,000,000 | |||||
| ||||||
24(Design & Contingencies - $10,500,000) |
| |||||
25(vi) Dauphin County |
| |||||
26(A) Acquire and rehabilitate or construct |
| |||||
28Project Allocation | 22,750,000 | |||||
| ||||||
1(Design & Contingencies - $2,275,000) |
| |||||
2(vii) Lancaster County |
| |||||
3(A) Additional funding for DGS Project |
| |||||
8Project Allocation | 20,700,000 | |||||
| ||||||
11(Design & Contingencies - $2,070,000) |
| |||||
12(viii) Lehigh County |
| |||||
13(A) Construction of a storm water |
| |||||
17Project Allocation | 1,000,000 | |||||
18(Base Project Allocation - $1,000,000) |
| |||||
19(ix) Luzerne County |
| |||||
20(A) Repair or replace debris dam |
| |||||
24Project Allocation | 1,800,000 | |||||
25(Base Project Allocation - $1,620,000) |
| |||||
26(Design & Contingencies - $180,000) |
| |||||
27(B) Additional funding for DGS Project
1ramps |
| |||||
2Project Allocation | 1,350,000 | |||||
3(Base Project Allocation - $1,215,000) |
| |||||
4(Design & Contingencies - $135,000) |
| |||||
5(x) Monroe County |
| |||||
6(A) Construction, infrastructure |
| |||||
9Project Allocation | 2,000,000 | |||||
10(Base Project Allocation - $2,000,000) |
| |||||
11(xi) Montgomery County |
| |||||
12(A) Additional funding for DGS Project |
| |||||
19Project Allocation | 4,000,000 | |||||
20(Base Project Allocation - $3,200,000) |
| |||||
21(Design & Contingencies - $800,000) |
| |||||
22(B) Additional funding for DGS Project |
| |||||
28Project Allocation | 360,000 | |||||
29(Base Project Allocation - $324,000) |
| |||||
30(Design & Contingencies - $36,000) |
| |||||
1(C) Additional funding for DGS Project |
| |||||
12Project Allocation | 1,800,000 | |||||
13(Base Project Allocation - $1,620,000) |
| |||||
14(Design & Contingencies - $180,000) |
| |||||
15(D) Construction, infrastructure |
| |||||
19Project Allocation | 200,000 | |||||
20(Base Project Allocation - $200,000) |
| |||||
21(xii) Philadelphia County |
| |||||
22(A) Construction, infrastructure, storm |
| |||||
26Project Allocation | 20,000,000 | |||||
| ||||||
29(B) Lake renovations and other costs
1Park |
| |||||
2Project Allocation | 20,000,000 | |||||
| ||||||
5(6) Department of General Services |
| |||||
6(i) Berks County |
| |||||
7(A) Upgrade and renovate two elevators in |
| |||||
13Project Allocation | 250,000 | |||||
14(Base Project Allocation - $150,000) |
| |||||
15(Design & Contingencies - $100,000) |
| |||||
16(B) Completely renovate two elevators, |
| |||||
19Project Allocation | 250,000 | |||||
20(Base Project Allocation - $150,000) |
| |||||
21(Design & Contingencies - $100,000) |
| |||||
22(C) Replace coal boilers with more |
| |||||
25Project Allocation | 1,000,000 | |||||
26(Base Project Allocation - $800,000) |
| |||||
27(Design & Contingencies - $200,000) |
| |||||
| ||||||
30Project Allocation | 100,000 | |||||
1(Base Project Allocation - $100,000) |
| |||||
2(i.1) Cambria County |
| |||||
3(A) Demolition, construction, |
| |||||
8Project Allocation | 15,000,000 | |||||
| ||||||
11(ii) Dauphin County |
| |||||
12(A) Replace wiring in all lighting |
| |||||
14Project Allocation | 1,500,000 | |||||
15(Base Project Allocation - $1,500,000) |
| |||||
16(B) Upgrade and renovate all existing |
| |||||
20Project Allocation | 1,820,000 | |||||
21(Base Project Allocation - $1,638,000) |
| |||||
22(Design & Contingencies - $182,000) |
| |||||
23(C) Upgrade and renovate all existing |
| |||||
26Project Allocation | 1,820,000 | |||||
27(Base Project Allocation - $1,638,000) |
| |||||
28(Design & Contingencies - $182,000) |
| |||||
29(D) Replace roof, including paver
1parapet material of Keystone Building |
| |||||
2Project Allocation | 2,500,000 | |||||
3(Base Project Allocation - $2,000,000) |
| |||||
4(Design & Contingencies - $500,000) |
| |||||
5(E) Replace parapet roof, including full |
| |||||
8Project Allocation | 700,000 | |||||
9(Base Project Allocation - $600,000) |
| |||||
10(Design & Contingencies - $100,000) |
| |||||
11(F) Repair roof-interstice space between |
| |||||
14Project Allocation | 1,000,000 | |||||
15(Base Project Allocation - $900,000) |
| |||||
16(Design & Contingencies - $100,000) |
| |||||
17(G) Replace roof and windows in Matthew |
| |||||
19Project Allocation | 550,000 | |||||
20(Base Project Allocation - $500,000) |
| |||||
21(Design & Contingencies - $50,000) |
| |||||
22(H) Remove and replace architectural |
| |||||
28Project Allocation | 113,000 | |||||
29(Base Project Allocation - $110,000) |
| |||||
30(Design & Contingencies - $3,000) |
| |||||
1(I) Install central air conditioning in |
| |||||
3Project Allocation | 116,000 | |||||
4(Base Project Allocation - $113,000) |
| |||||
5(Design & Contingencies - $3,000) |
| |||||
6(J) Repair or replace damaged sandstone |
| |||||
9Project Allocation | 310,000 | |||||
10(Base Project Allocation - $300,000) |
| |||||
11(Design & Contingencies - $10,000) |
| |||||
12(K) Reline cooling towers, including |
| |||||
15Project Allocation | 1,500,000 | |||||
16(Base Project Allocation - $1,500,000) |
| |||||
| ||||||
19Project Allocation | 750,000 | |||||
20(Base Project Allocation - $700,000) |
| |||||
21(Design & Contingencies - $50,000) |
| |||||
22(M) Repave or rebuild various annex |
| |||||
24Project Allocation | 681,000 | |||||
25(Base Project Allocation - $681,000) |
| |||||
| ||||||
28Project Allocation | 381,000 | |||||
29(Base Project Allocation - $381,000) |
| |||||
30(O) Completely renovate elevators, |
| |||||
3Project Allocation | 910,000 | |||||
4(Base Project Allocation - $700,000) |
| |||||
5(Design & Contingencies - $210,000) |
| |||||
6(P) Completely renovate elevators, |
| |||||
9Project Allocation | 910,000 | |||||
10(Base Project Allocation - $700,000) |
| |||||
11(Design & Contingencies - $210,000) |
| |||||
12(Q) Repair or replace pavers within |
| |||||
14Project Allocation | 2,000,000 | |||||
15(Base Project Allocation - $1,500,000) |
| |||||
16(Design & Contingencies - $500,000) |
| |||||
17(R) Completely replace roof of Arsenal |
| |||||
20Project Allocation | 700,000 | |||||
21(Base Project Allocation - $600,000) |
| |||||
22(Design & Contingencies - $100,000) |
| |||||
23(S) Replace chiller that controls cooling |
| |||||
25Project Allocation | 600,000 | |||||
26(Base Project Allocation - $480,000) |
| |||||
27(Design & Contingencies - $120,000) |
| |||||
| ||||||
30Project Allocation | 1,000,000 | |||||
1(Base Project Allocation - $800,000) |
| |||||
2(Design & Contingencies - $200,000) |
| |||||
3(U) Completely renovate all building |
| |||||
6Project Allocation | 4,000,000 | |||||
7(Base Project Allocation - $3,200,000) |
| |||||
8(Design & Contingencies - $800,000) |
| |||||
9(V) Completely renovate all building |
| |||||
12Project Allocation | 8,000,000 | |||||
13(Base Project Allocation - $6,400,000) |
| |||||
14(Design & Contingencies - $1,600,000) |
| |||||
15(W) Replace secondary switchgear in State |
| |||||
18Project Allocation | 2,500,000 | |||||
19(Base Project Allocation - $2,000,000) |
| |||||
20(Design & Contingencies - $500,000) |
| |||||
21(X) Replace generator in Petry Building |
| |||||
22Project Allocation | 500,000 | |||||
23(Base Project Allocation - $400,000) |
| |||||
24(Design & Contingencies - $100,000) |
| |||||
25(Y) Replace security and fire detection |
| |||||
28Project Allocation | 11,500,000 | |||||
| ||||||
1(Design & Contingencies - $1,000,000) |
| |||||
2(Z) Install replacement windows |
| |||||
5Project Allocation | 1,000,000 | |||||
6(Base Project Allocation - $900,000) |
| |||||
7(Design & Contingencies - $100,000) |
| |||||
8(AA) Repoint bad joints and install |
| |||||
12Project Allocation | 1,000,000 | |||||
13(Base Project Allocation - $900,000) |
| |||||
14(Design & Contingencies - $100,000) |
| |||||
<-15(BB) Upgrade security in Capitol Complex |
| |||||
<-16(BB) Upgrade security in State buildings |
| |||||
19Project Allocation | 5,800,000 | |||||
20(Base Project Allocation - $5,800,000) |
| |||||
21(iii) Lackawanna County |
| |||||
22(A) Upgrade security at the Scranton |
| |||||
24Project Allocation | 100,000 | |||||
25(Base Project Allocation - $100,000) |
| |||||
26(iv) Philadelphia County |
| |||||
27(A) Renovations and rehabilitation of |
| |||||
30Project Allocation | 38,000,000 | |||||
| ||||||
3(6.1) Pennsylvania Emergency Management Agency |
| |||||
4(i) Eastern Area Office Building |
| |||||
5(A) Demolish and remediate old Eastern |
| |||||
8Project Allocation | 1,000,000 | |||||
9(Base Project Allocation - $900,000) |
| |||||
10(Design & Contingencies - $100,000) |
| |||||
| ||||||
<-13(i) Bowman's Hill Wildflower Preserve |
| |||||
14(A) Construction and other related costs |
| |||||
17Project Allocation | 2,500,000 | |||||
18(Base Project Allocation - $2,500,000) |
| |||||
19(i) <-(ii) Brandywine Battlefield Park |
| |||||
20(A) Acquisition, infrastructure, |
| |||||
26Project Allocation | 7,200,000 | |||||
27(Base Project Allocation - $6,000,000) |
| |||||
28(Design & Contingencies - $1,200,000) |
| |||||
29(ii) <-(iii) Daniel Boone Homestead |
| |||||
30(A) Restore Daniel Boone Homestead and
1other structures at site |
| |||||
2Project Allocation | 3,600,000 | |||||
3(Base Project Allocation - $3,000,000) |
| |||||
4(Design & Contingencies - $600,000) |
| |||||
5(iii) <-(iv) Eckley Miners' Village |
| |||||
6(A) Install fire protection system, |
| |||||
10Project Allocation | 3,600,000 | |||||
11(Base Project Allocation - $3,000,000) |
| |||||
12(Design & Contingencies - $600,000) |
| |||||
13(B) Provide for Phase IV of preservation |
| |||||
18Project Allocation | 4,800,000 | |||||
19(Base Project Allocation - $4,000,000) |
| |||||
20(Design & Contingencies - $800,000) |
| |||||
21(iv) <-(v) Erie Maritime Museum |
| |||||
22(A) Provide for replacement of portions |
| |||||
27Project Allocation | 3,600,000 | |||||
28(Base Project Allocation - $3,000,000) |
| |||||
29(Design & Contingencies - $600,000) |
| |||||
30(v) <-(vi) Landis Valley Village and Farm
1Museum |
| |||||
2(A) Replace underground sewage, water, |
| |||||
8Project Allocation | 9,000,000 | |||||
9(Base Project Allocation - $7,500,000) |
| |||||
10(Design & Contingencies - $1,500,000) |
| |||||
11(B) Install fire protection system, |
| |||||
15Project Allocation | 3,600,000 | |||||
16(Base Project Allocation - $3,000,000) |
| |||||
17(Design & Contingencies - $600,000) |
| |||||
18(C) Provide site improvements, including |
| |||||
21Project Allocation | 3,600,000 | |||||
22(Base Project Allocation - $3,000,000) |
| |||||
23(Design & Contingencies - $600,000) |
| |||||
24(D) Design, fabricate and install new |
| |||||
27Project Allocation | 4,000,000 | |||||
28(Base Project Allocation - $4,000,000) |
| |||||
29(vi) <-(vii) Old Economy Village |
| |||||
30(A) Rehabilitate exterior and structure
1of up to 18 buildings, including |
| |||||
8Project Allocation | 3,000,000 | |||||
9(Base Project Allocation - $2,500,000) |
| |||||
10(Design & Contingencies - $500,000) |
| |||||
11(vii) <-(viii) Pennsbury Manor |
| |||||
12(A) Install fire protection system, |
| |||||
16Project Allocation | 2,400,000 | |||||
17(Base Project Allocation - $2,000,000) |
| |||||
18(Design & Contingencies - $400,000) |
| |||||
| ||||||
21(A) Install fire protection system, |
| |||||
26Project Allocation | 960,000 | |||||
27(Base Project Allocation - $800,000) |
| |||||
28(Design & Contingencies - $160,000) |
| |||||
29(ix) <-(x) Pennsylvania Lumber Museum |
| |||||
30(A) Provide for second phase of exhibits
1in main gallery, as well as outdoor |
| |||||
3Project Allocation | 3,600,000 | |||||
4(Base Project Allocation - $3,000,000) |
| |||||
5(Design & Contingencies - $600,000) |
| |||||
6(x) <-(xi) Railroad Museum of Pennsylvania |
| |||||
7(A) Install fire protection system, |
| |||||
11Project Allocation | 1,200,000 | |||||
12(Base Project Allocation - $1,000,000) |
| |||||
13(Design & Contingencies - $200,000) |
| |||||
14(x.1) <-(xii) Scranton Iron Furnaces |
| |||||
15(A) Restore and stabilize furnaces, |
| |||||
18Project Allocation | 6,000,000 | |||||
19(Base Project Allocation - $5,000,000) |
| |||||
20(Design & Contingencies - $1,000,000) |
| |||||
21(xi) <-(xiii) Washington Crossing Historic Park |
| |||||
22(A) Provide restoration and improvements |
| |||||
25Project Allocation | 6,000,000 | |||||
26(Base Project Allocation - $5,000,000) |
| |||||
27(Design & Contingencies - $1,000,000) |
| |||||
28(B) Install fire protection system,
1to buildings |
| |||||
2Project Allocation | 2,400,000 | |||||
3(Base Project Allocation - $2,000,000) |
| |||||
4(Design & Contingencies - $400,000) |
| |||||
5(8) Department of Labor and Industry |
| |||||
6(i) Labor and Industry Building, Harrisburg, |
| |||||
8(A) Replace two high voltage |
| |||||
10Project Allocation | 5,000,000 | |||||
11(Base Project Allocation - $4,500,000) |
| |||||
12(Design & Contingencies - $500,000) |
| |||||
13(9) Department of Military and Veterans Affairs |
| |||||
14(i) (Reserved) |
| |||||
| ||||||
17(A) Rehabilitate Coraopolis Readiness |
| |||||
24Project Allocation | 1,500,000 | |||||
25(Base Project Allocation - $1,250,000) |
| |||||
26(Design & Contingencies - $250,000) |
| |||||
| ||||||
29(A) Rehabilitate Pittsburgh Hunt
1hall, classrooms, administrative |
| |||||
8Project Allocation | 4,500,000 | |||||
9(Base Project Allocation - $4,000,000) |
| |||||
10(Design & Contingencies - $500,000) |
| |||||
11(iv) Pittsburgh Support Maintenance Shop, |
| |||||
13(A) Combine three field maintenance shops |
| |||||
17Project Allocation | 1,440,000 | |||||
18(Base Project Allocation - $1,200,000) |
| |||||
19(Design & Contingencies - $240,000) |
| |||||
| ||||||
22(A) Renovate and repair Southwestern |
| |||||
25Project Allocation | 3,125,000 | |||||
26(Base Project Allocation - $2,500,000) |
| |||||
27(Design & Contingencies - $625,000) |
| |||||
28(B) Provide for renovation and general
1regulatory deficiencies |
| |||||
2Project Allocation | 8,125,000 | |||||
3(Base Project Allocation - $7,313,000) |
| |||||
4(Design & Contingencies - $812,000) |
| |||||
| ||||||
7(A) Rehabilitate Ford City Readiness |
| |||||
15Project Allocation | 3,000,000 | |||||
16(Base Project Allocation - $2,500,000) |
| |||||
17(Design & Contingencies - $500,000) |
| |||||
| ||||||
20(A) Rehabilitate Hollidaysburg Readiness |
| |||||
27Project Allocation | 2,800,000 | |||||
28(Base Project Allocation - $2,400,000) |
| |||||
29(Design & Contingencies - $400,000) |
| |||||
30(viii) Hollidaysburg Veterans Home, Blair
1County |
| |||||
2(A) Provide for renovation and general |
| |||||
8Project Allocation | 1,325,000 | |||||
9(Base Project Allocation - $1,060,000) |
| |||||
10(Design & Contingencies - $265,000) |
| |||||
11(B) Provide for renovation and general |
| |||||
13Project Allocation | 6,325,000 | |||||
14(Base Project Allocation - $5,693,000) |
| |||||
15(Design & Contingencies - $632,000) |
| |||||
16(ix) Butler Readiness Center, Butler County |
| |||||
17(A) Rehabilitate Butler Readiness Center, |
| |||||
25Project Allocation | 3,800,000 | |||||
26(Base Project Allocation - $3,300,000) |
| |||||
27(Design & Contingencies - $500,000) |
| |||||
| ||||||
30(A) Provide for renovation and general
1repairs of Southeastern Veterans |
| |||||
6Project Allocation | 1,925,000 | |||||
7(Base Project Allocation - $1,540,000) |
| |||||
8(Design & Contingencies - $385,000) |
| |||||
9(B) Provide for renovation and general |
| |||||
13Project Allocation | 9,925,000 | |||||
14(Base Project Allocation - $8,933,000) |
| |||||
15(Design & Contingencies - $992,000) |
| |||||
16(xi) Spring City Armory, Chester County |
| |||||
17(A) Rehabilitate Spring City Armory to |
| |||||
26Project Allocation | 3,600,000 | |||||
27(Base Project Allocation - $3,000,000) |
| |||||
28(Design & Contingencies - $600,000) |
| |||||
| ||||||
1(A) Rehabilitate Spring City Readiness |
| |||||
9Project Allocation | 3,600,000 | |||||
10(Base Project Allocation - $3,000,000) |
| |||||
11(Design & Contingencies - $600,000) |
| |||||
| ||||||
14(A) Rehabilitate Lock Haven Readiness |
| |||||
22Project Allocation | 3,000,000 | |||||
23(Base Project Allocation - $2,500,000) |
| |||||
24(Design & Contingencies - $500,000) |
| |||||
| ||||||
27(A) Rehabilitate Harrisburg Readiness
1and mechanical rooms; upgrade building |
| |||||
5Project Allocation | 4,600,000 | |||||
6(Base Project Allocation - $4,000,000) |
| |||||
7(Design & Contingencies - $600,000) |
| |||||
8(xiv.1) Harrisburg Maintenance Shop |
| |||||
9(A) Rehabilitate Harrisburg Field |
| |||||
20Project Allocation | 3,500,000 | |||||
21(Base Project Allocation - $3,000,000) |
| |||||
22(Design & Contingencies - $500,000) |
| |||||
| ||||||
25(A) Provide for renovation and general |
| |||||
29Project Allocation | 13,400,000 | |||||
30(Base Project Allocation -
1$12,060,000) |
| |||||
2(Design & Contingencies - $1,340,000) |
| |||||
| ||||||
5(A) Rehabilitate Indiana Readiness |
| |||||
13Project Allocation | 3,200,000 | |||||
14(Base Project Allocation - $2,700,000) |
| |||||
15(Design & Contingencies - $500,000) |
| |||||
| ||||||
18(A) Provide for renovation and general |
| |||||
22Project Allocation | 9,895,000 | |||||
23(Base Project Allocation - $8,906,000) |
| |||||
24(Design & Contingencies - $989,000) |
| |||||
| ||||||
27(A) Rehabilitate maintenance shop, |
| |||||
1Project Allocation | 4,500,000 | |||||
2(Base Project Allocation - $4,000,000) |
| |||||
3(Design & Contingencies - $500,000) |
| |||||
| ||||||
6(A) Rehabilitate maintenance shop, |
| |||||
10Project Allocation | 2,500,000 | |||||
11(Base Project Allocation - $2,000,000) |
| |||||
12(Design & Contingencies - $500,000) |
| |||||
13(xvii.3) Combat Aviation Brigade Readiness |
| |||||
15(A) Rehabilitate 28th Aviation Brigade at |
| |||||
22Project Allocation | 4,500,000 | |||||
23(Base Project Allocation - $4,000,000) |
| |||||
24(Design & Contingencies - $500,000) |
| |||||
25(xvii.4) Recruiting and Retention Battalion, |
| |||||
27(A) Rehabilitate recruiting and retention
1spaces, restrooms, locker rooms and |
| |||||
6Project Allocation | 2,500,000 | |||||
7(Base Project Allocation - $2,000,000) |
| |||||
8(Design & Contingencies - $500,000) |
| |||||
| ||||||
11(A) Rehabilitate Wilkes-Barre Readiness |
| |||||
18Project Allocation | 3,000,000 | |||||
19(Base Project Allocation- $2,500,000) |
| |||||
20(Design & Contingencies - $500,000) |
| |||||
| ||||||
23(A) Rehabilitate maintenance shop, |
| |||||
27Project Allocation | 2,500,000 | |||||
28(Base Project Allocation - $2,000,000) |
| |||||
29(Design & Contingencies - $500,000) |
| |||||
30(xix) Bradford Readiness Center, McKean
1County |
| |||||
2(A) Expand Bradford Readiness Center, |
| |||||
7Project Allocation | 1,200,000 | |||||
8(Base Project Allocation - $1,000,000) |
| |||||
9(Design & Contingencies - $200,000) |
| |||||
10(B) Expand Bradford Readiness Center, |
| |||||
12Project Allocation | 1,200,000 | |||||
13(Base Project Allocation - $1,000,000) |
| |||||
14(Design & Contingencies - $200,000) |
| |||||
15(xx) Kane Readiness Center, McKean County |
| |||||
16(A) Rehabilitate Kane Readiness Center, |
| |||||
24Project Allocation | 3,300,000 | |||||
25(Base Project Allocation - $2,800,000) |
| |||||
26(Design & Contingencies - $500,000) |
| |||||
| ||||||
29(A) Rehabilitate Hermitage Readiness
1classrooms, administrative offices, |
| |||||
7Project Allocation | 4,700,000 | |||||
8(Base Project Allocation - $4,000,000) |
| |||||
9(Design & Contingencies - $700,000) |
| |||||
| ||||||
12(A) Rehabilitate East Stroudsburg |
| |||||
21Project Allocation | 3,000,000 | |||||
22(Base Project Allocation - $2,400,000) |
| |||||
23(Design & Contingencies - $600,000) |
| |||||
24(xxiii) Tobyhanna Armed Forces Reserve |
| |||||
26(A) Rehabilitation and building expansion
1maintenance facility |
| |||||
2Project Allocation | 600,000 | |||||
3(Base Project Allocation - $500,000) |
| |||||
4(Design & Contingencies - $100,000) |
| |||||
5(xxiv) Plymouth Meeting Readiness Center, |
| |||||
7(A) Rehabilitate Plymouth Meeting |
| |||||
16Project Allocation | 4,500,000 | |||||
17(Base Project Allocation - $3,900,000) |
| |||||
18(Design & Contingencies - $600,000) |
| |||||
| ||||||
21(A) Provide for renovation and general |
| |||||
25Project Allocation | 10,250,000 | |||||
26(Base Project Allocation - $9,225,000) |
| |||||
27(Design & Contingencies - $1,025,000) |
| |||||
28(B) Provide for renovation and general
1regulatory deficiencies |
| |||||
2Project Allocation | 5,625,000 | |||||
3(Base Project Allocation - $4,500,000) |
| |||||
4(Design & Contingencies - $1,125,000) |
| |||||
5(xxv.1) Southampton Road Readiness Center, |
| |||||
7(A) Rehabilitate assembly hall, |
| |||||
12Project Allocation | 4,500,000 | |||||
13(Base Project Allocation - $4,000,000) |
| |||||
14(Design & Contingencies - $500,000) |
| |||||
15(xxv.2) 23rd Street Readiness Center, |
| |||||
17(A) Rehabilitate assembly hall, |
| |||||
22Project Allocation | 3,500,000 | |||||
23(Base Project Allocation - $3,000,000) |
| |||||
24(Design & Contingencies - $500,000) |
| |||||
25(xxvi) Schuylkill County Readiness Center, |
| |||||
27(A) Purchase 10 to 20 acres of land for
1requirements |
| |||||
2Project Allocation | 1,600,000 | |||||
3(Land Allocation - $1,600,000) |
| |||||
| ||||||
6(A) Rehabilitate assembly hall, |
| |||||
13Project Allocation | 3,500,000 | |||||
14(Base Project Allocation - $3,000,000) |
| |||||
15(Design & Contingencies - $500,000) |
| |||||
16(xxvii) Mount Pleasant Readiness Center, |
| |||||
18(A) Rehabilitate Mount Pleasant Readiness |
| |||||
26Project Allocation | 3,000,000 | |||||
27(Base Project Allocation - $2,500,000) |
| |||||
28(Design & Contingencies - $500,000) |
| |||||
29(xxviii) York Readiness Center, York County |
| |||||
30(A) Rehabilitate York Readiness Center,
1including assembly hall, classrooms, |
| |||||
8Project Allocation | 2,400,000 | |||||
9(Base Project Allocation - $2,000,000) |
| |||||
10(Design & Contingencies - $400,000) |
| |||||
11(10) Department of Public Welfare |
| |||||
12(i) Clarks Summit State Hospital |
| |||||
13(A) Replace all G & W oil switches and |
| |||||
18Project Allocation | 5,000,000 | |||||
19(Base Project Allocation - $4,300,000) |
| |||||
20(Design & Contingencies - $700,000) |
| |||||
21(B) Upgrade fire alarm and fire |
| |||||
23Project Allocation | 2,800,000 | |||||
24(Base Project Allocation - $2,520,000) |
| |||||
25(Design & Contingencies - $280,000) |
| |||||
26(C) Replace boilers |
| |||||
27Project Allocation | 4,200,000 | |||||
28(Base Project Allocation - $3,780,000) |
| |||||
29(Design & Contingencies - $420,000) |
| |||||
30(ii) Cresson Secure Treatment Unit |
| |||||
1(A) Construct multipurpose modular |
| |||||
3Project Allocation | 3,000,000 | |||||
4(Base Project Allocation - $2,500,000) |
| |||||
5(Design & Contingencies - $500,000) |
| |||||
6(iii) Danville State Hospital |
| |||||
| ||||||
9Project Allocation | 750,000 | |||||
10(Base Project Allocation - $650,000) |
| |||||
11(Design & Contingencies - $100,000) |
| |||||
12(B) Replace roofs on various buildings |
| |||||
13Project Allocation | 1,800,000 | |||||
14(Base Project Allocation - $1,620,000) |
| |||||
15(Design & Contingencies - $180,000) |
| |||||
16(iv) Ebensburg Center |
| |||||
17(A) Replace, install and upgrade air |
| |||||
21Project Allocation | 500,000 | |||||
22(Base Project Allocation - $388,000) |
| |||||
23(Design & Contingencies - $112,000) |
| |||||
24(B) Upgrade fire alarm and fire |
| |||||
26Project Allocation | 2,200,000 | |||||
27(Base Project Allocation - $1,980,000) |
| |||||
28(Design & Contingencies - $220,000) |
| |||||
29(C) Replace current HVAC |
| |||||
30Project Allocation | 3,500,000 | |||||
1(Base Project Allocation - $3,150,000) |
| |||||
2(Design & Contingencies - $350,000) |
| |||||
3(iv.1) Hamburg Center |
| |||||
| ||||||
6Project Allocation | 1,000,000 | |||||
7(Base Project Allocation - $900,000) |
| |||||
8(Design & Contingencies - $100,000) |
| |||||
9(v) Loysville Youth Development Center |
| |||||
10(A) Replace fire lines and pumps and |
| |||||
13Project Allocation | 1,800,000 | |||||
14(Base Project Allocation - $1,500,000) |
| |||||
15(Design & Contingencies - $300,000) |
| |||||
16(B) Upgrade and replace HVAC equipment |
| |||||
19Project Allocation | 3,000,000 | |||||
20(Base Project Allocation - $2,700,000) |
| |||||
21(Design & Contingencies - $300,000) |
| |||||
22(vi) (Reserved) |
| |||||
23(vii) Norristown State Hospital |
| |||||
24(A) Demolish vacant and deteriorated |
| |||||
27Project Allocation | 1,000,000 | |||||
28(Base Project Allocation - $900,000) |
| |||||
29(Design & Contingencies - $100,000) |
| |||||
30(B) Upgrade and replace HVAC equipment |
| |||||
3Project Allocation | 5,000,000 | |||||
4(Base Project Allocation - $4,500,000) |
| |||||
5(Design & Contingencies - $500,000) |
| |||||
6(viii) North Central Secure Treatment Unit |
| |||||
7(A) Construct multipurpose modular |
| |||||
9Project Allocation | 5,400,000 | |||||
10(Base Project Allocation - $4,500,000) |
| |||||
11(Design & Contingencies - $900,000) |
| |||||
12(B) Replace existing standard glass |
| |||||
16Project Allocation | 600,000 | |||||
17(Base Project Allocation - $540,000) |
| |||||
18(Design & Contingencies - $60,000) |
| |||||
| ||||||
21Project Allocation | 9,000,000 | |||||
22(Base Project Allocation - $8,100,000) |
| |||||
23(Design & Contingencies - $900,000) |
| |||||
24(viii.1) Philipsburg State Hospital |
| |||||
| ||||||
27Project Allocation | 6,000,000 | |||||
28(Base Project Allocation - $5,400,000) |
| |||||
29(Design & Contingencies - $600,000) |
| |||||
30(ix) Polk Center |
| |||||
1(A) Remove and replace water plant |
| |||||
2Project Allocation | 2,500,000 | |||||
3(Base Project Allocation - $2,500,000) |
| |||||
4(B) Repair all mortar joints between |
| |||||
7Project Allocation | 2,500,000 | |||||
8(Base Project Allocation - $2,250,000) |
| |||||
9(Design & Contingencies - $250,000) |
| |||||
10(C) Upgrade fire alarm and fire |
| |||||
12Project Allocation | 1,800,000 | |||||
13(Base Project Allocation - $1,620,000) |
| |||||
14(Design & Contingencies - $180,000) |
| |||||
15(x) Selinsgrove Center |
| |||||
16(A) Reseal joints and renovate lighting |
| |||||
20Project Allocation | 550,000 | |||||
21(Base Project Allocation - $475,000) |
| |||||
22(Design & Contingencies - $75,000) |
| |||||
23(B) Upgrade fire alarm and fire |
| |||||
25Project Allocation | 2,700,000 | |||||
26(Base Project Allocation - $2,430,000) |
| |||||
27(Design & Contingencies - $270,000) |
| |||||
28(C) Funding for DGS Project 553-34 |
| |||||
30Project Allocation | 3,500,000 | |||||
1(Base Project Allocation - $3,150,000) |
| |||||
2(Design & Contingencies - $350,000) |
| |||||
3(xi) South Mountain Restoration Center |
| |||||
4(A) Provide for breech of Carbarough Dam |
| |||||
8Project Allocation | 3,500,000 | |||||
9(Base Project Allocation - $3,150,000) |
| |||||
10(Design & Contingencies - $350,000) |
| |||||
11(xii) Torrance State Hospital |
| |||||
12(A) Replace existing wastewater treatment |
| |||||
15Project Allocation | 4,500,000 | |||||
16(Base Project Allocation - $4,200,000) |
| |||||
17(Design & Contingencies - $300,000) |
| |||||
18(B) Additional funds for construction and |
| |||||
21Project Allocation | 2,000,000 | |||||
22(Base Project Allocation - $2,000,000) |
| |||||
23(xiii) Warren State Hospital |
| |||||
24(A) Upgrade medium-voltage and low- |
| |||||
27Project Allocation | 4,000,000 | |||||
28(Base Project Allocation - $3,600,000) |
| |||||
29(Design & Contingencies - $400,000) |
| |||||
30(xiii.1) Wernersville State Hospital |
| |||||
1(A) Replace boiler |
| |||||
2Project Allocation | 1,500,000 | |||||
3(Base Project Allocation - $1,350,000) |
| |||||
4(Design & Contingencies - $150,000) |
| |||||
5(xiv) White Haven Center |
| |||||
6(A) Upgrade fire alarm and fire |
| |||||
8Project Allocation | 2,100,000 | |||||
9(Base Project Allocation - $1,890,000) |
| |||||
10(Design & Contingencies - $210,000) |
| |||||
11(B) Upgrade existing facility to comply |
| |||||
13Project Allocation | 5,500,000 | |||||
14(Base Project Allocation - $4,950,000) |
| |||||
15(Design & Contingencies - $550,000) |
| |||||
| ||||||
18Project Allocation | 5,000,000 | |||||
19(Base Project Allocation - $4,500,000) |
| |||||
20(Design & Contingencies - $500,000) |
| |||||
21(xv) Youth Forestry Camp No. 2 |
| |||||
22(A) Demolish existing building and |
| |||||
24Project Allocation | 750,000 | |||||
25(Base Project Allocation - $675,000) |
| |||||
26(Design & Contingencies - $75,000) |
| |||||
27(xvi) Youth Forestry Camp No. 3 |
| |||||
28(A) Install HVAC |
| |||||
29Project Allocation | 700,000 | |||||
30(Base Project Allocation - $630,000) |
| |||||
1(Design & Contingencies - $70,000) |
| |||||
2(11) Pennsylvania State Police |
| |||||
3(i) DNA Laboratory, Westmoreland County |
| |||||
4(A) Construct new DNA laboratory in |
| |||||
7Project Allocation | 29,000,000 | |||||
8(Base Project Allocation - 22,500,000) |
| |||||
9(Land Allocation - $1,500,000) |
| |||||
10(Design & Contingencies - $5,000,000) |
| |||||
| ||||||
| ||||||
15Project Allocation | 9,264,000 | |||||
16(Base Project Allocation - $7,720,000) |
| |||||
17(Design & Contingencies - $1,544,000) |
| |||||
| ||||||
20(A) Construction and other related costs |
| |||||
23Project Allocation | 8,164,000 | |||||
24(Base Project Allocation - $7,220,000) |
| |||||
25(Design & Contingencies - $944,000) |
| |||||
26(12) State System of Higher Education |
| |||||
27(i) Bloomsburg University |
| |||||
28(A) Construct facilities complex to
1buildings |
| |||||
2Project Allocation | 19,000,000 | |||||
| ||||||
5(Design & Contingencies - $3,800,000) |
| |||||
6(ii) Cheyney University |
| |||||
| ||||||
9Project Allocation | 9,000,000 | |||||
10(Base Project Allocation - $7,200,000) |
| |||||
11(Design & Contingencies - $1,800,000) |
| |||||
12(B) Construction, infrastructure and |
| |||||
15Project Allocation | 12,000,000 | |||||
| ||||||
18(Design & Contingencies - $2,000,000) |
| |||||
19(C) Renovate Cope Athletic Complex and |
| |||||
21Project Allocation | 10,000,000 | |||||
22(Base Project Allocation - $8,000,000) |
| |||||
23(Design & Contingencies - $2,000,000) |
| |||||
<-24(D) Additional funding to construct new |
| |||||
26Project Allocation | 500,000 | |||||
27(Base Project Allocation - $500,000) |
| |||||
28(iii) East Stroudsburg University |
| |||||
| ||||||
1Project Allocation | 45,000,000 | |||||
| ||||||
4(Design & Contingencies - $9,000,000) |
| |||||
5(iii.1) Edinboro University |
| |||||
<-6(A) Rehabilitate existing facility to |
| |||||
9Project Allocation | 1,000,000 | |||||
10(Base Project Allocation - $1,000,000) |
| |||||
| ||||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $5,000,000) |
| |||||
15(iv) Indiana University of Pennsylvania |
| |||||
16(A) Additional funding for renovation of |
| |||||
19Project Allocation | 14,500,000 | |||||
| ||||||
22(Design & Contingencies - $2,900,000) |
| |||||
23(v) Kutztown University |
| |||||
24(A) Additional funding for renovation of |
| |||||
27Project Allocation | 9,000,000 | |||||
28(Base Project Allocation - $7,200,000) |
| |||||
29(Design & Contingencies - $1,800,000) |
| |||||
30(B) Renovate DeFrancesco Building
1interior |
| |||||
2Project Allocation | 5,000,000 | |||||
3(Base Project Allocation - $5,000,000) |
| |||||
4(vi) Lock Haven University |
| |||||
5(A) Renovate and upgrade campus |
| |||||
8Project Allocation | 16,000,000 | |||||
| ||||||
11(Design & Contingencies - $3,200,000) |
| |||||
12(B) Additional funding for renovation of |
| |||||
16Project Allocation | 23,000,000 | |||||
| ||||||
19(Design & Contingencies - $4,600,000) |
| |||||
| ||||||
22Project Allocation | 15,000,000 | |||||
| ||||||
25(Design & Contingencies - $3,000,000) |
| |||||
<-26(D) Construction and other related costs |
| |||||
28Project Allocation | 10,000,000 | |||||
| ||||||
1(vii) Mansfield University |
| |||||
2(A) Renovate Belknap and Retan Halls to |
| |||||
5Project Allocation | 10,000,000 | |||||
6(Base Project Allocation - $8,000,000) |
| |||||
7(Design & Contingencies - $2,000,000) |
| |||||
| ||||||
10Project Allocation | 8,000,000 | |||||
11(Base Project Allocation - $6,400,000) |
| |||||
12(Design & Contingencies - $1,600,000) |
| |||||
13(C) Reroute Morris Drive |
| |||||
14Project Allocation | 6,000,000 | |||||
15(Base Project Allocation - $4,800,000) |
| |||||
16(Design & Contingencies - $1,200,000) |
| |||||
| ||||||
19Project Allocation | 6,000,000 | |||||
20(Base Project Allocation - $4,800,000) |
| |||||
21(Design & Contingencies - $1,200,000) |
| |||||
22(E) Upgrade utilities and infrastructure |
| |||||
25Project Allocation | 10,000,000 | |||||
26(Base Project Allocation - $8,000,000) |
| |||||
27(Design & Contingencies - $2,000,000) |
| |||||
28(viii) Millersville University |
| |||||
29(A) Completely renovate Pucillo Hall, |
| |||||
1Project Allocation | 7,000,000 | |||||
2(Base Project Allocation - $5,600,000) |
| |||||
3(Design & Contingencies - $1,400,000) |
| |||||
4(B) Completely renovate Brooks Hall into |
| |||||
6Project Allocation | 15,000,000 | |||||
| ||||||
9(Design & Contingencies - $3,000,000) |
| |||||
10(ix) Shippensburg University |
| |||||
11(A) Additional funding for renovation of |
| |||||
13Project Allocation | 25,000,000 | |||||
| ||||||
16(Design & Contingencies - $5,000,000) |
| |||||
| ||||||
19Project Allocation | 11,000,000 | |||||
20(Base Project Allocation - $8,800,000) |
| |||||
21(Design & Contingencies - $2,200,000) |
| |||||
22(ix.1) Slippery Rock University |
| |||||
<-23(A) Renovate, demolish and construct an |
| |||||
26Project Allocation | 1,000,000 | |||||
27(Base Project Allocation - $1,000,000) |
| |||||
<-28(A) Additional funding for renovation and |
| |||||
30Project Allocation | 1,000,000 | |||||
1(Base Project Allocation - $1,000,000) |
| |||||
2(x) West Chester University |
| |||||
3(A) Additional funding for renovation of |
| |||||
6Project Allocation | 13,000,000 | |||||
| ||||||
9(Design & Contingencies - $2,600,000) |
| |||||
10(B) Construct new athletics facility, |
| |||||
12Project Allocation | 15,000,000 | |||||
| ||||||
15(Design & Contingencies - $3,000,000) |
| |||||
| ||||||
18Project Allocation | 20,000,000 | |||||
| ||||||
21(Design & Contingencies - $4,000,000) |
| |||||
22(13) Department of Transportation |
| |||||
23(i) Adams County |
| |||||
24(A) Construct new vehicle wash building |
| |||||
26Project Allocation | 690,000 | |||||
27(Base Project Allocation - $600,000) |
| |||||
28(Design & Contingencies - $90,000) |
| |||||
29(B) Develop new stockpile facility in
1design and construction |
| |||||
2Project Allocation | 2,220,000 | |||||
3(Base Project Allocation - $2,000,000) |
| |||||
4(Land Allocation - $20,000) |
| |||||
5(Design & Contingencies - $200,000) |
| |||||
6(C) Renovate and expand current Adams |
| |||||
10Project Allocation | 2,500,000 | |||||
11(Base Project Allocation - $2,200,000) |
| |||||
12(Design & Contingencies - $300,000) |
| |||||
13(D) Develop new stockpile, including site |
| |||||
15Project Allocation | 3,000,000 | |||||
16(Base Project Allocation - $1,750,000) |
| |||||
17(Land Allocation - $750,000) |
| |||||
18(Design & Contingencies - $500,000) |
| |||||
19(E) Construct four new storage buildings |
| |||||
21Project Allocation | 1,400,000 | |||||
22(Base Project Allocation - $1,190,000) |
| |||||
23(Design & Contingencies - $210,000) |
| |||||
24(F) Demolish and construct two new salt |
| |||||
27Project Allocation | 400,000 | |||||
28(Base Project Allocation - $350,000) |
| |||||
29(Design & Contingencies - $50,000) |
| |||||
30(ii) Allegheny County |
| |||||
1(A) Renovate Allegheny County District |
| |||||
5Project Allocation | 2,200,000 | |||||
6(Base Project Allocation - $2,000,000) |
| |||||
7(Design & Contingencies - $200,000) |
| |||||
8(B) Renovate Allegheny County Maintenance |
| |||||
12Project Allocation | 825,000 | |||||
13(Base Project Allocation - $750,000) |
| |||||
14(Design & Contingencies - $75,000) |
| |||||
15(C) Construct new PM/service/line paint |
| |||||
18Project Allocation | 775,000 | |||||
19(Base Project Allocation - $700,000) |
| |||||
20(Design & Contingencies - $75,000) |
| |||||
21(D) Construct new service/PM building at |
| |||||
24Project Allocation | 3,850,000 | |||||
25(Base Project Allocation - $3,500,000) |
| |||||
26(Design & Contingencies - $350,000) |
| |||||
27(E) Replace electric generators and |
| |||||
1Project Allocation | 3,350,000 | |||||
2(Base Project Allocation - $3,000,000) |
| |||||
3(Design & Contingencies - $350,000) |
| |||||
4(F) Demolish and construct new salt |
| |||||
7Project Allocation | 2,400,000 | |||||
8(Base Project Allocation - $2,100,000) |
| |||||
9(Design & Contingencies - $300,000) |
| |||||
10(G) Renovate and expand Rest Site 11, |
| |||||
15Project Allocation | 2,000,000 | |||||
16(Base Project Allocation - $1,800,000) |
| |||||
17(Design & Contingencies - $200,000) |
| |||||
18(H) Renovate and expand Rest Site 12, |
| |||||
23Project Allocation | 2,000,000 | |||||
24(Base Project Allocation - $1,800,000) |
| |||||
25(Design & Contingencies - $200,000) |
| |||||
26(I) Renovate and expand Allegheny County
1sewage plant upgrades |
| |||||
2Project Allocation | 1,400,000 | |||||
3(Base Project Allocation - $1,250,000) |
| |||||
4(Design & Contingencies - $150,000) |
| |||||
5(J) Renovate and expand Allegheny County |
| |||||
9Project Allocation | 3,500,000 | |||||
10(Base Project Allocation - $3,000,000) |
| |||||
11(Design & Contingencies - $500,000) |
| |||||
12(K) Construct new maintenance garage at |
| |||||
14Project Allocation | 3,750,000 | |||||
15(Base Project Allocation - $3,250,000) |
| |||||
16(Design & Contingencies - $500,000) |
| |||||
17(ii.1) Armstrong County |
| |||||
18(A) Demolish and construct new salt |
| |||||
21Project Allocation | 800,000 | |||||
22(Base Project Allocation - $700,000) |
| |||||
23(Design & Contingencies - $100,000) |
| |||||
24(iii) Beaver County |
| |||||
25(A) Construct new PM/service/line paint |
| |||||
28Project Allocation | 775,000 | |||||
29(Base Project Allocation - $700,000) |
| |||||
30(Design & Contingencies - $75,000) |
| |||||
1(B) Remove and replace roof system at |
| |||||
3Project Allocation | 525,000 | |||||
4(Base Project Allocation - $450,000) |
| |||||
5(Design & Contingencies - $75,000) |
| |||||
6(C) Construct new PM building at Beaver |
| |||||
8Project Allocation | 1,100,000 | |||||
9(Base Project Allocation - $1,000,000) |
| |||||
10(Design & Contingencies - $100,000) |
| |||||
11(D) Remove and replace HVAC system and |
| |||||
14Project Allocation | 1,150,000 | |||||
15(Base Project Allocation - $1,000,000) |
| |||||
16(Design & Contingencies - $150,000) |
| |||||
17(E) Demolish and construct two new salt |
| |||||
20Project Allocation | 800,000 | |||||
21(Base Project Allocation - $700,000) |
| |||||
22(Design & Contingencies - $100,000) |
| |||||
23(F) Renovate and expand Beaver County |
| |||||
29Project Allocation | 1,400,000 | |||||
30(Base Project Allocation - $1,250,000) |
| |||||
1(Design & Contingencies - $150,000) |
| |||||
2(G) Renovate and expand Beaver County |
| |||||
6Project Allocation | 3,600,000 | |||||
7(Base Project Allocation - $3,250,000) |
| |||||
8(Design & Contingencies - $350,000) |
| |||||
9(iii.1) Bedford County |
| |||||
10(A) Develop new stockpile, including site |
| |||||
12Project Allocation | 3,000,000 | |||||
13(Base Project Allocation - $1,750,000) |
| |||||
14(Land Allocation - $750,000) |
| |||||
15(Design & Contingencies - $500,000) |
| |||||
16(B) Demolish and construct new salt |
| |||||
19Project Allocation | 1,200,000 | |||||
20(Base Project Allocation - $1,050,000) |
| |||||
21(Design & Contingencies - $150,000) |
| |||||
22(C) Construct new maintenance garage, |
| |||||
26Project Allocation | 15,000,000 | |||||
| ||||||
29(Land Allocation - $1,000,000) |
| |||||
30(Design & Contingencies - $2,250,000) |
| |||||
1(D) Renovate and expand current county |
| |||||
5Project Allocation | 2,500,000 | |||||
6(Base Project Allocation - $2,125,000) |
| |||||
7(Design & Contingencies - $375,000) |
| |||||
8(iv) Berks County |
| |||||
9(A) Construct new vehicle wash building |
| |||||
11Project Allocation | 690,000 | |||||
12(Base Project Allocation - $600,000) |
| |||||
13(Design & Contingencies - $90,000) |
| |||||
14(B) Reskin metal building at Berks County |
| |||||
16Project Allocation | 350,000 | |||||
17(Base Project Allocation - $300,000) |
| |||||
18(Design & Contingencies - $50,000) |
| |||||
19(C) Renovate and expand Berks County |
| |||||
23Project Allocation | 2,000,000 | |||||
24(Base Project Allocation - $1,700,000) |
| |||||
25(Design & Contingencies - $300,000) |
| |||||
26(iv.1) Blair County |
| |||||
27(A) Renovate and expand District Office |
| |||||
30Project Allocation | 2,000,000 | |||||
1(Base Project Allocation - $1,700,000) |
| |||||
2(Design & Contingencies - $300,000) |
| |||||
3(B) Renovate and expand Blair County |
| |||||
7Project Allocation | 2,500,000 | |||||
8(Base Project Allocation - $2,125,000) |
| |||||
9(Design & Contingencies - $375,000) |
| |||||
10(C) Design and construction of new |
| |||||
14Project Allocation | 350,000 | |||||
15(Base Project Allocation - $300,000) |
| |||||
16(Design & Contingencies - $50,000) |
| |||||
17(D) Demolish and construct new salt |
| |||||
20Project Allocation | 400,000 | |||||
21(Base Project Allocation - $350,000) |
| |||||
22(Design & Contingencies - $50,000) |
| |||||
23(iv.2) Bradford County |
| |||||
24(A) Develop new stockpile facility, |
| |||||
27Project Allocation | 3,000,000 | |||||
28(Base Project Allocation - $1,750,000) |
| |||||
29(Land Allocation - $750,000) |
| |||||
30(Design & Contingencies - $500,000) |
| |||||
1(B) Demolish and construct new storage |
| |||||
5Project Allocation | 400,000 | |||||
6(Base Project Allocation - $350,000) |
| |||||
7(Design & Contingencies - $50,000) |
| |||||
8(C) Demolish and construct new salt |
| |||||
10Project Allocation | 5,000,000 | |||||
11(Base Project Allocation - $4,500,000) |
| |||||
12(Design & Contingencies - $500,000) |
| |||||
13(D) Renovate and expand Bradford County |
| |||||
17Project Allocation | 2,000,000 | |||||
18(Base Project Allocation - $1,700,000) |
| |||||
19(Design & Contingencies - $300,000) |
| |||||
20(iv.3) Bucks County |
| |||||
21(A) Construct new salt storage buildings |
| |||||
24Project Allocation | 1,600,000 | |||||
25(Base Project Allocation - $1,400,000) |
| |||||
26(Design & Contingencies - $200,000) |
| |||||
27(B) Renovate and expand Welcome Center
1upgrades and sewage plant upgrades |
| |||||
2Project Allocation | 1,050,000 | |||||
3(Base Project Allocation - $1,000,000) |
| |||||
4(Design & Contingencies - $50,000) |
| |||||
5(iv.4) Cambria County |
| |||||
6(A) Develop new stockpile, including site |
| |||||
8Project Allocation | 3,000,000 | |||||
9(Base Project Allocation - $1,750,000) |
| |||||
10(Land Allocation - $750,000) |
| |||||
11(Design & Contingencies - $500,000) |
| |||||
12(B) Develop new stockpile, including site |
| |||||
14Project Allocation | 3,000,000 | |||||
15(Base Project Allocation - $1,750,000) |
| |||||
16(Land Allocation - $750,000) |
| |||||
17(Design & Contingencies - $500,000) |
| |||||
18(C) Demolish and construct new salt |
| |||||
21Project Allocation | 800,000 | |||||
22(Base Project Allocation - $720,000) |
| |||||
23(Design & Contingencies - $80,000) |
| |||||
24(D) Renovate and expand Cambria County |
| |||||
30Project Allocation | 1,400,000 | |||||
1(Base Project Allocation - $1,250,000) |
| |||||
2(Design & Contingencies - $150,000) |
| |||||
3(E) Renovate and expand Cambria County |
| |||||
7Project Allocation | 2,000,000 | |||||
8(Base Project Allocation - $1,700,000) |
| |||||
9(Design & Contingencies - $300,000) |
| |||||
10(iv.5) Cameron County |
| |||||
11(A) Construct new county maintenance |
| |||||
16Project Allocation | 15,000,000 | |||||
| ||||||
19(Land Allocation - $1,000,000) |
| |||||
20(Design & Contingencies - $2,225,000) |
| |||||
21(B) Renovate and expand current Cameron |
| |||||
25Project Allocation | 2,000,000 | |||||
26(Base Project Allocation - $1,700,000) |
| |||||
27(Design & Contingencies - $300,000) |
| |||||
28(iv.6) Carbon County |
| |||||
29(A) Construct new salt storage building
1Maintenance Facility |
| |||||
2Project Allocation | 400,000 | |||||
3(Base Project Allocation - $350,000) |
| |||||
4(Design & Contingencies - $50,000) |
| |||||
5(B) Demolish and construct satellite |
| |||||
8Project Allocation | 2,300,000 | |||||
9(Base Project Allocation - $1,970,000) |
| |||||
10(Design & Contingencies - $30,000) |
| |||||
11(C) Renovate and expand Carbon County |
| |||||
15Project Allocation | 2,000,000 | |||||
16(Base Project Allocation - $1,700,000) |
| |||||
17(Design & Contingencies - $300,000) |
| |||||
18(iv.7) Centre County |
| |||||
19(A) Renovate and expand current Centre |
| |||||
23Project Allocation | 2,000,000 | |||||
24(Base Project Allocation - $1,700,000) |
| |||||
25(Design & Contingencies - $300,000) |
| |||||
26(B) Renovate and expand County Rest Site |
| |||||
1Project Allocation | 2,000,000 | |||||
2(Base Project Allocation - $1,800,000) |
| |||||
3(Design & Contingencies - $200,000) |
| |||||
4(C) Renovate and expand County Rest Site |
| |||||
9Project Allocation | 2,000,000 | |||||
10(Base Project Allocation - $1,800,000) |
| |||||
11(Design & Contingencies - $200,000) |
| |||||
12(D) Renovate and expand Centre County |
| |||||
18Project Allocation | 1,400,000 | |||||
19(Base Project Allocation - $1,250,000) |
| |||||
20(Design & Contingencies - $150,000) |
| |||||
21(iv.8) Chester County |
| |||||
22(A) Construct new salt storage building |
| |||||
25Project Allocation | 350,000 | |||||
26(Base Project Allocation - $300,000) |
| |||||
27(Design & Contingencies - $50,000) |
| |||||
28(B) Construct new salt storage buildings |
| |||||
1Project Allocation | 1,600,000 | |||||
2(Base Project Allocation - $1,400,000) |
| |||||
3(Design & Contingencies - $200,000) |
| |||||
4(iv.9) Clarion County |
| |||||
5(A) Renovate and expand Clarion County |
| |||||
9Project Allocation | 1,900,000 | |||||
10(Base Project Allocation - $1,700,000) |
| |||||
11(Design & Contingencies - $200,000) |
| |||||
12(iv.10) Clearfield County |
| |||||
13(A) Renovate and expand current |
| |||||
17Project Allocation | 2,000,000 | |||||
18(Base Project Allocation - $1,700,000) |
| |||||
19(Design & Contingencies - $300,000) |
| |||||
20(B) Construct new salt storage buildings |
| |||||
23Project Allocation | 400,000 | |||||
24(Base Project Allocation - $350,000) |
| |||||
25(Design & Contingencies - $50,000) |
| |||||
26(iv.11) Clinton County |
| |||||
27(A) Construct new salt storage buildings |
| |||||
29Project Allocation | 800,000 | |||||
30(Base Project Allocation - $700,000) |
| |||||
1(Design & Contingencies - $100,000) |
| |||||
2(B) Renovate and expand Rest Site 33, |
| |||||
7Project Allocation | 2,000,000 | |||||
8(Base Project Allocation - $1,800,000) |
| |||||
9(Design & Contingencies - $200,000) |
| |||||
10(C) Renovate and expand Rest Site 34, |
| |||||
15Project Allocation | 2,000,000 | |||||
16(Base Project Allocation - $1,800,000) |
| |||||
17(Design & Contingencies - $200,000) |
| |||||
18(iv.12) Columbia County |
| |||||
19(A) Renovate and expand Rest Site 37, |
| |||||
24Project Allocation | 2,000,000 | |||||
25(Base Project Allocation - $1,800,000) |
| |||||
26(Design & Contingencies - $200,000) |
| |||||
27(B) Renovate and expand Rest Site 38,
1and sewage plant upgrades |
| |||||
2Project Allocation | 2,000,000 | |||||
3(Base Project Allocation - $1,800,000) |
| |||||
4(Design & Contingencies - $200,000) |
| |||||
5(C) Renovate and expand current Columbia |
| |||||
9Project Allocation | 2,000,000 | |||||
10(Base Project Allocation - $1,700,000) |
| |||||
11(Design & Contingencies - $300,000) |
| |||||
12(D) Construction of new Columbia County |
| |||||
17Project Allocation | 15,000,000 | |||||
| ||||||
20(Land Allocation - $1,000,000) |
| |||||
21(Design & Contingencies - $2,250,000) |
| |||||
22(E) Construct new salt storage buildings |
| |||||
24Project Allocation | 800,000 | |||||
25(Base Project Allocation - $700,000) |
| |||||
26(Design & Contingencies - $100,000) |
| |||||
27(iv.13) Crawford County |
| |||||
28(A) Demolish and construct new storage
1Maintenance Facility |
| |||||
2Project Allocation | 350,000 | |||||
3(Base Project Allocation - $298,000) |
| |||||
4(Design & Contingencies - $52,000) |
| |||||
5(B) Renovate and expand County Rest Site |
| |||||
10Project Allocation | 2,500,000 | |||||
11(Base Project Allocation - $2,200,000) |
| |||||
12(Design & Contingencies - $300,000) |
| |||||
13(C) Renovate and expand County Rest Site |
| |||||
18Project Allocation | 2,500,000 | |||||
19(Base Project Allocation - $2,200,000) |
| |||||
20(Design & Contingencies - $300,000) |
| |||||
21(D) Renovate and expand Crawford County |
| |||||
27Project Allocation | 1,400,000 | |||||
28(Base Project Allocation - $1,250,000) |
| |||||
29(Design & Contingencies - $150,000) |
| |||||
30(E) Renovate and expand Crawford County
1Maintenance Garage, including roof |
| |||||
4Project Allocation | 2,500,000 | |||||
5(Base Project Allocation - $2,125,000) |
| |||||
6(Design & Contingencies - $375,000) |
| |||||
7(iv.14) Cumberland County |
| |||||
8(A) Demolish and construct two new salt |
| |||||
12Project Allocation | 800,000 | |||||
13(Base Project Allocation - $700,000) |
| |||||
14(Design & Contingencies - $100,000) |
| |||||
15(B) Renovate and expand Rest Site 45, |
| |||||
20Project Allocation | 2,000,000 | |||||
21(Base Project Allocation - $1,800,000) |
| |||||
22(Design & Contingencies - $200,000) |
| |||||
23(C) Renovate and expand Rest Site 46, |
| |||||
28Project Allocation | 2,000,000 | |||||
29(Base Project Allocation - $1,800,000) |
| |||||
30(Design & Contingencies - $200,000) |
| |||||
1(v) Dauphin County |
| |||||
2(A) Construct new vehicle wash building |
| |||||
4Project Allocation | 690,000 | |||||
5(Base Project Allocation - $600,000) |
| |||||
6(Design & Contingencies - $90,000) |
| |||||
7(B) Develop new stockpile facility in |
| |||||
10Project Allocation | 2,220,000 | |||||
11(Base Project Allocation - $2,000,000) |
| |||||
12(Land Allocation - $20,000) |
| |||||
13(Design & Contingencies - $200,000) |
| |||||
14(C) Construct new vehicle wash building |
| |||||
17Project Allocation | 690,000 | |||||
18(Base Project Allocation - $600,000) |
| |||||
19(Design & Contingencies - $90,000) |
| |||||
20(D) Renovate and expand District Office |
| |||||
23Project Allocation | 2,000,000 | |||||
24(Base Project Allocation - $1,700,000) |
| |||||
25(Design & Contingencies - $300,000) |
| |||||
26(E) Renovate and expand current Dauphin |
| |||||
30Project Allocation | 2,500,000 | |||||
1(Base Project Allocation - $2,125,000) |
| |||||
2(Design & Contingencies - $375,000) |
| |||||
3(F) Demolish and construct two new salt |
| |||||
6Project Allocation | 800,000 | |||||
7(Base Project Allocation - $700,000) |
| |||||
8(Design & Contingencies - $100,000) |
| |||||
9(G) Renovation and expansion of Dauphin |
| |||||
13Project Allocation | 2,500,000 | |||||
14(Base Project Allocation - $2,200,000) |
| |||||
15(Design & Contingencies - $300,000) |
| |||||
16(H) Renovate and expand Dauphin County |
| |||||
20Project Allocation | 3,500,000 | |||||
21(Base Project Allocation - $3,100,000) |
| |||||
22(Design & Contingencies - $400,000) |
| |||||
23(vi) Delaware County |
| |||||
24(A) Develop new stockpile facility in |
| |||||
27Project Allocation | 2,220,000 | |||||
28(Base Project Allocation - $2,000,000) |
| |||||
29(Land Allocation - $20,000) |
| |||||
30(Design & Contingencies - $200,000) |
| |||||
1(B) Construct new salt storage buildings |
| |||||
4Project Allocation | 800,000 | |||||
5(Base Project Allocation - $700,000) |
| |||||
6(Design & Contingencies - $100,000) |
| |||||
7(C) Renovate and expand Welcome Center |
| |||||
12Project Allocation | 1,050,000 | |||||
13(Base Project Allocation - $1,000,000) |
| |||||
14(Design & Contingencies - $50,000) |
| |||||
15(D) Renovate and expand Delaware County |
| |||||
19Project Allocation | 1,500,000 | |||||
20(Base Project Allocation - $1,000,000) |
| |||||
21(Design & Contingencies - $500,000) |
| |||||
22(vi.1) Elk County |
| |||||
23(A) Construct new salt storage building |
| |||||
25Project Allocation | 350,000 | |||||
26(Base Project Allocation - $300,000) |
| |||||
27(Design & Contingencies - $50,000) |
| |||||
28(vi.2) Erie County |
| |||||
29(A) Develop new stockpile facilities, |
| |||||
3Project Allocation | 9,000,000 | |||||
4(Base Project Allocation - $5,250,000) |
| |||||
5(Land Allocation - $2,250,000) |
| |||||
6(Design & Contingencies - $1,500,000) |
| |||||
7(B) Renovate and expand Welcome Center |
| |||||
12Project Allocation | 2,500,000 | |||||
13(Base Project Allocation - $2,200,000) |
| |||||
14(Design & Contingencies - $300,000) |
| |||||
15(C) Renovate and expand Welcome Center |
| |||||
20Project Allocation | 2,000,000 | |||||
21(Base Project Allocation - $1,800,000) |
| |||||
22(Design & Contingencies - $200,000) |
| |||||
23(D) Renovate and expand Erie County |
| |||||
27Project Allocation | 2,500,000 | |||||
28(Base Project Allocation - $2,125,000) |
| |||||
29(Design & Contingencies - $375,000) |
| |||||
30(vi.3) Fayette County |
| |||||
1(A) Construct new maintenance garage, |
| |||||
5Project Allocation | 15,000,000 | |||||
| ||||||
8(Land Allocation - $1,000,000) |
| |||||
9(Design & Contingencies - $2,250,000) |
| |||||
10(B) Demolish and construct three new salt |
| |||||
13Project Allocation | 1,200,000 | |||||
14(Base Project Allocation - $1,050,000) |
| |||||
15(Design & Contingencies - $150,000) |
| |||||
16(C) Renovate and expand District Office |
| |||||
19Project Allocation | 2,500,000 | |||||
20(Base Project Allocation - $2,150,000) |
| |||||
21(Design & Contingencies - $350,000) |
| |||||
22(D) Renovate and expand current driver |
| |||||
27Project Allocation | 1,400,000 | |||||
28(Base Project Allocation - $1,250,000) |
| |||||
29(Design & Contingencies - $150,000) |
| |||||
30(vi.4) Forest County |
| |||||
1(A) Construct new Forest County |
| |||||
6Project Allocation | 15,000,000 | |||||
| ||||||
9(Land Allocation - $1,000,000) |
| |||||
10(Design & Contingencies - $2,250,000) |
| |||||
11(B) Construct new salt storage facility |
| |||||
13Project Allocation | 350,000 | |||||
14(Base Project Allocation - $298,000) |
| |||||
15(Design & Contingencies - $52,000) |
| |||||
16(vii) Franklin County |
| |||||
17(A) Develop new stockpile facility in |
| |||||
20Project Allocation | 2,220,000 | |||||
21(Base Project Allocation - $2,000,000) |
| |||||
22(Land Allocation - $20,000) |
| |||||
23(Design & Contingencies - $200,000) |
| |||||
24(B) Develop new stockpile facility to |
| |||||
28Project Allocation | 2,220,000 | |||||
29(Base Project Allocation - $2,000,000) |
| |||||
30(Land Allocation - $20,000) |
| |||||
1(Design & Contingencies - $200,000) |
| |||||
2(C) Construct new storage buildings and |
| |||||
4Project Allocation | 1,800,000 | |||||
5(Base Project Allocation - $1,530,000) |
| |||||
6(Design & Contingencies - $270,000) |
| |||||
7(D) Renovate and expand current Franklin |
| |||||
11Project Allocation | 2,000,000 | |||||
12(Base Project Allocation - $1,700,000) |
| |||||
13(Design & Contingencies - $300,000) |
| |||||
14(E) Construct new salt storage buildings |
| |||||
17Project Allocation | 800,000 | |||||
18(Base Project Allocation - $700,000) |
| |||||
19(Design & Contingencies - $100,000) |
| |||||
20(F) Renovate and expand Welcome Center |
| |||||
25Project Allocation | 2,000,000 | |||||
26(Base Project Allocation - $1,800,000) |
| |||||
27(Design & Contingencies - $200,000) |
| |||||
28(G) Renovate and expand current driver |
| |||||
3Project Allocation | 1,400,000 | |||||
4(Base Project Allocation - $1,250,000) |
| |||||
5(Design & Contingencies - $150,000) |
| |||||
6(vii.1) Fulton County |
| |||||
7(A) Renovate and expand current |
| |||||
12Project Allocation | 2,700,000 | |||||
13(Base Project Allocation - $2,350,000) |
| |||||
14(Design & Contingencies - $350,000) |
| |||||
15(B) Demolish and construct new salt |
| |||||
18Project Allocation | 1,200,000 | |||||
19(Base Project Allocation - $1,050,000) |
| |||||
20(Design & Contingencies - $150,000) |
| |||||
21(C) Renovate and expand Welcome Center |
| |||||
26Project Allocation | 2,500,000 | |||||
27(Base Project Allocation - $2,200,000) |
| |||||
28(Design & Contingencies - $300,000) |
| |||||
29(D) Renovate and expand Rest Site 3,
1systems upgrade, sidewalks, curbing, |
| |||||
4Project Allocation | 2,500,000 | |||||
5(Base Project Allocation - $2,200,000) |
| |||||
6(Design & Contingencies - $300,000) |
| |||||
7(vii.2) Greene County |
| |||||
| ||||||
10Project Allocation | 1,800,000 | |||||
11(Base Project Allocation - $1,530,000) |
| |||||
12(Design & Contingencies - $270,000) |
| |||||
13(B) Demolish and construct new salt |
| |||||
16Project Allocation | 800,000 | |||||
17(Base Project Allocation - $720,000) |
| |||||
18(Design & Contingencies - $80,000) |
| |||||
19(C) Renovate and expand Greene County |
| |||||
23Project Allocation | 3,000,000 | |||||
24(Base Project Allocation - $2,650,000) |
| |||||
25(Design & Contingencies - $350,000) |
| |||||
26(D) Renovate and expand Welcome Center |
| |||||
1Project Allocation | 2,500,000 | |||||
2(Base Project Allocation - $2,200,000) |
| |||||
3(Design & Contingencies - $300,000) |
| |||||
4(E) Renovate and expand Greene County |
| |||||
10Project Allocation | 1,400,000 | |||||
11(Base Project Allocation - $1,250,000) |
| |||||
12(Design & Contingencies - $150,000) |
| |||||
13(vii.3) Huntingdon County |
| |||||
14(A) Renovate and expand Huntingdon County |
| |||||
18Project Allocation | 2,700,000 | |||||
19(Base Project Allocation - $2,350,000) |
| |||||
20(Design & Contingencies - $350,000) |
| |||||
21(B) Demolish and construct new salt |
| |||||
25Project Allocation | 1,200,000 | |||||
26(Base Project Allocation - $1,050,000) |
| |||||
27(Design & Contingencies - $150,000) |
| |||||
28(vii.4) Indiana County |
| |||||
29(A) Develop new stockpile, including site |
| |||||
1Project Allocation | 3,050,000 | |||||
2(Base Project Allocation - $1,750,000) |
| |||||
3(Land Allocation - $750,000) |
| |||||
4(Design & Contingencies - $550,000) |
| |||||
5(B) Renovate and expand Indiana County |
| |||||
9Project Allocation | 2,520,000 | |||||
10(Base Project Allocation - $2,220,000) |
| |||||
11(Design & Contingencies - $300,000) |
| |||||
12(vii.5) Jefferson County |
| |||||
13(A) Renovate and expand Rest Site 25, |
| |||||
18Project Allocation | 2,500,000 | |||||
19(Base Project Allocation - $2,200,000) |
| |||||
20(Design & Contingencies - $300,000) |
| |||||
21(B) Renovate and expand Rest Site 26, |
| |||||
26Project Allocation | 2,500,000 | |||||
27(Base Project Allocation - $2,200,000) |
| |||||
28(Design & Contingencies - $300,000) |
| |||||
29(C) Renovate and expand Jefferson County
1replacement, building systems upgrade |
| |||||
3Project Allocation | 1,500,000 | |||||
4(Base Project Allocation - $1,350,000) |
| |||||
5(Design & Contingencies - $150,000) |
| |||||
6(vii.6) Juniata County |
| |||||
7(A) Renovate and expand Juniata County |
| |||||
11Project Allocation | 2,000,000 | |||||
12(Base Project Allocation - $1,700,000) |
| |||||
13(Design & Contingencies - $300,000) |
| |||||
14(viii) Lackawanna County |
| |||||
15(A) Renovate and expand District 4-0 |
| |||||
20Project Allocation | 2,750,000 | |||||
21(Base Project Allocation - $2,500,000) |
| |||||
22(Design & Contingencies - $250,000) |
| |||||
23(B) Construct new county metal storage |
| |||||
26Project Allocation | 350,000 | |||||
27(Base Project Allocation - $300,000) |
| |||||
28(Design & Contingencies - $50,000) |
| |||||
| ||||||
1Project Allocation | 15,000,000 | |||||
| ||||||
4(Land Allocation - $1,000,000) |
| |||||
5(Design & Contingencies - $2,250,000) |
| |||||
6(D) Renovate and expand current |
| |||||
10Project Allocation | 2,520,000 | |||||
11(Base Project Allocation - $2,125,000) |
| |||||
12(Design & Contingencies - $375,000) |
| |||||
13(E) Demolish and construct four new |
| |||||
17Project Allocation | 1,600,000 | |||||
18(Base Project Allocation - $1,400,000) |
| |||||
19(Design & Contingencies - $200,000) |
| |||||
20(F) Construct addition to District Office |
| |||||
23Project Allocation | 4,000,000 | |||||
24(Base Project Allocation - $3,400,000) |
| |||||
25(Design & Contingencies - $600,000) |
| |||||
26(G) Renovate and expand Lackawanna County
1replacement, parking lot upgrades and |
| |||||
4Project Allocation | 2,500,000 | |||||
5(Base Project Allocation - $2,200,000) |
| |||||
6(Design & Contingencies - $300,000) |
| |||||
7(ix) Lancaster County |
| |||||
8(A) Develop new stockpile facility in |
| |||||
11Project Allocation | 2,220,000 | |||||
12(Base Project Allocation - $2,000,000) |
| |||||
13(Land Allocation - $20,000) |
| |||||
14(Design & Contingencies - $200,000) |
| |||||
15(B) Renovate and expand current Lancaster |
| |||||
19Project Allocation | 2,500,000 | |||||
20(Base Project Allocation - $2,125,000) |
| |||||
21(Design & Contingencies - $375,000) |
| |||||
22(C) Demolish and construct new salt |
| |||||
25Project Allocation | 2,000,000 | |||||
26(Base Project Allocation - $1,750,000) |
| |||||
27(Design & Contingencies - $250,000) |
| |||||
28(x) Lawrence County |
| |||||
29(A) Construct new PM building at Lawrence |
| |||||
1Project Allocation | 825,000 | |||||
2(Base Project Allocation - $750,000) |
| |||||
3(Design & Contingencies - $75,000) |
| |||||
4(B) Develop new stock pile facility, |
| |||||
7Project Allocation | 3,000,000 | |||||
8(Base Project Allocation - $1,750,000) |
| |||||
9(Land Allocation - $750,000) |
| |||||
10(Design & Contingencies - $500,000) |
| |||||
11(C) Construct new salt storage building |
| |||||
14Project Allocation | 800,000 | |||||
15(Base Project Allocation - $720,000) |
| |||||
16(Design & Contingencies - $80,000) |
| |||||
17(D) Construct new maintenance garage, |
| |||||
21Project Allocation | 15,000,000 | |||||
| ||||||
24(Land Allocation - $1,000,000) |
| |||||
25(Design & Contingencies - $2,250,000) |
| |||||
26(E) Demolish and construct two new salt |
| |||||
29Project Allocation | 800,000 | |||||
30(Base Project Allocation - $700,000) |
| |||||
1(Design & Contingencies - $100,000) |
| |||||
2(F) Renovate and expand Lawrence County |
| |||||
8Project Allocation | 1,400,000 | |||||
9(Base Project Allocation - $1,250,000) |
| |||||
10(Design & Contingencies - $150,000) |
| |||||
11(G) Renovate and expand Lawrence County |
| |||||
17Project Allocation | 1,250,000 | |||||
18(Base Project Allocation - $1,200,000) |
| |||||
19(Design & Contingencies - $50,000) |
| |||||
20(H) Renovate and expand Lawrence County |
| |||||
26Project Allocation | 1,250,000 | |||||
27(Base Project Allocation - $1,200,000) |
| |||||
28(Design & Contingencies - $50,000) |
| |||||
29(x.1) Lebanon County |
| |||||
30(A) Construct new maintenance garage,
1including salt storage buildings, |
| |||||
4Project Allocation | 15,000,000 | |||||
| ||||||
7(Land Allocation - $1,000,000) |
| |||||
8(Design & Contingencies - $2,250,000) |
| |||||
9(B) Demolish and construct new salt |
| |||||
12Project Allocation | 1,600,000 | |||||
13(Base Project Allocation - $1,400,000) |
| |||||
14(Design & Contingencies - $200,000) |
| |||||
15(C) Renovate and expand Lebanon County |
| |||||
21Project Allocation | 1,400,000 | |||||
22(Base Project Allocation - $1,250,000) |
| |||||
23(Design & Contingencies - $150,000) |
| |||||
24(D) Renovate and expand Lebanon County |
| |||||
28Project Allocation | 2,000,000 | |||||
29(Base Project Allocation - $1,700,000) |
| |||||
30(Design & Contingencies - $300,000) |
| |||||
1(xi) Lehigh County |
| |||||
2(A) Construct new vehicle wash building |
| |||||
4Project Allocation | 690,000 | |||||
5(Base Project Allocation - $600,000) |
| |||||
6(Design & Contingencies - $90,000) |
| |||||
7(B) Renovate and expand Lehigh County |
| |||||
11Project Allocation | 1,150,000 | |||||
12(Base Project Allocation - $1,000,000) |
| |||||
13(Design & Contingencies - $150,000) |
| |||||
14(C) Construction of new salt storage |
| |||||
17Project Allocation | 350,000 | |||||
18(Base Project Allocation - $300,000) |
| |||||
19(Design & Contingencies - $50,000) |
| |||||
20(D) Renovate and expand District Office |
| |||||
23Project Allocation | 2,000,000 | |||||
24(Base Project Allocation - $1,700,000) |
| |||||
25(Design & Contingencies - $300,000) |
| |||||
26(E) Renovate and expand Lehigh County |
| |||||
30Project Allocation | 1,500,000 | |||||
1(Base Project Allocation - $1,275,000) |
| |||||
2(Design & Contingencies - $225,000) |
| |||||
3(xii) Luzerne County |
| |||||
4(A) Develop new stockpile facility, |
| |||||
7Project Allocation | 2,220,000 | |||||
8(Base Project Allocation - $2,000,000) |
| |||||
9(Land Allocation - $20,000) |
| |||||
10(Design & Contingencies - $200,000) |
| |||||
11(B) Construct new salt storage buildings |
| |||||
13Project Allocation | 850,000 | |||||
14(Base Project Allocation - $730,000) |
| |||||
15(Design & Contingencies - $120,000) |
| |||||
16(C) Construct new bay storage buildings |
| |||||
19Project Allocation | 350,000 | |||||
20(Base Project Allocation - $300,000) |
| |||||
21(Design & Contingencies - $50,000) |
| |||||
22(D) Construct new county metal storage |
| |||||
25Project Allocation | 350,000 | |||||
26(Base Project Allocation - $300,000) |
| |||||
27(Design & Contingencies - $50,000) |
| |||||
28(E) Construct seven new salt storage
1Facility |
| |||||
2Project Allocation | 2,800,000 | |||||
3(Base Project Allocation - $2,450,000) |
| |||||
4(Design & Contingencies - $350,000) |
| |||||
5(F) Renovate and expand Rest Site 39, |
| |||||
10Project Allocation | 2,500,000 | |||||
11(Base Project Allocation - $2,200,000) |
| |||||
12(Design & Contingencies - $300,000) |
| |||||
13(G) Renovate and expand Rest Site 53, |
| |||||
18Project Allocation | 1,050,000 | |||||
19(Base Project Allocation - $1,000,000) |
| |||||
20(Design & Contingencies - $50,000) |
| |||||
21(H) Renovate and expand Rest Site 54, |
| |||||
26Project Allocation | 1,050,000 | |||||
27(Base Project Allocation - $1,000,000) |
| |||||
28(Design & Contingencies - $50,000) |
| |||||
29(xii.1) Lycoming County |
| |||||
30(A) Demolish and construct new storage
1buildings and site work at various |
| |||||
4Project Allocation | 1,200,000 | |||||
5(Base Project Allocation - $1,050,000) |
| |||||
6(Design & Contingencies - $150,000) |
| |||||
7(B) Renovate and expand current District |
| |||||
10Project Allocation | 2,500,000 | |||||
11(Base Project Allocation - $2,125,000) |
| |||||
12(Design & Contingencies - $375,000) |
| |||||
13(C) Renovate and expand Lycoming County |
| |||||
17Project Allocation | 2,000,000 | |||||
18(Base Project Allocation - $1,700,000) |
| |||||
19(Design & Contingencies - $300,000) |
| |||||
20(xii.2) McKean County |
| |||||
21(A) Construct new salt storage buildings |
| |||||
23Project Allocation | 700,000 | |||||
24(Base Project Allocation - $650,000) |
| |||||
25(Design & Contingencies - $50,000) |
| |||||
26(B) Renovate and expand McKean County |
| |||||
30Project Allocation | 2,000,000 | |||||
1(Base Project Allocation - $1,700,000) |
| |||||
2(Design & Contingencies - $300,000) |
| |||||
3(xii.3) Mercer County |
| |||||
4(A) Develop new maintenance garage, |
| |||||
8Project Allocation | 2,500,000 | |||||
9(Base Project Allocation - $2,125,000) |
| |||||
10(Design & Contingencies - $375,000) |
| |||||
11(B) Renovate and expand Rest Site 17, |
| |||||
16Project Allocation | 2,500,000 | |||||
17(Base Project Allocation - $2,200,000) |
| |||||
18(Design & Contingencies - $300,000) |
| |||||
19(C) Renovate and expand Rest Site 18, |
| |||||
24Project Allocation | 2,500,000 | |||||
25(Base Project Allocation - $2,200,000) |
| |||||
26(Design & Contingencies - $300,000) |
| |||||
27(D) Construct new county maintenance
1County Maintenance Garage |
| |||||
2Project Allocation | 15,000,000 | |||||
| ||||||
5(Land Allocation - $1,000,000) |
| |||||
6(Design & Contingencies - $2,250,000) |
| |||||
7(E) Demolish and construct new storage |
| |||||
11Project Allocation | 800,000 | |||||
12(Base Project Allocation - $700,000) |
| |||||
13(Design & Contingencies - $100,000) |
| |||||
14(F) Renovate and expand Mercer County |
| |||||
20Project Allocation | 1,400,000 | |||||
21(Base Project Allocation - $1,250,000) |
| |||||
22(Design & Contingencies - $150,000) |
| |||||
23(xii.4) Mifflin County |
| |||||
24(A) Renovate and expand Mifflin County |
| |||||
30Project Allocation | 1,400,000 | |||||
1(Base Project Allocation - $1,250,000) |
| |||||
2(Design & Contingencies - $150,000) |
| |||||
3(xii.5) Monroe County |
| |||||
4(A) Construct new salt storage building, |
| |||||
8Project Allocation | 15,000,000 | |||||
| ||||||
11(Land Allocation - $1,000,000) |
| |||||
12(Design & Contingencies - $2,250,000) |
| |||||
13(B) Renovate and expand current Monroe |
| |||||
17Project Allocation | 3,000,000 | |||||
18(Base Project Allocation - $2,550,000) |
| |||||
19(Design & Contingencies - $450,000) |
| |||||
20(C) Renovate and expand Rest Site 41, |
| |||||
26Project Allocation | 2,500,000 | |||||
27(Base Project Allocation - $2,200,000) |
| |||||
28(Design & Contingencies - $300,000) |
| |||||
29(D) Renovate and expand Monroe County
1replacement, building systems upgrades |
| |||||
3Project Allocation | 2,000,000 | |||||
4(Base Project Allocation - $1,700,000) |
| |||||
5(Design & Contingencies - $300,000) |
| |||||
6(xiii) Montgomery County |
| |||||
7(A) Renovate Montgomery County District |
| |||||
11Project Allocation | 440,000 | |||||
12(Base Project Allocation - $400,000) |
| |||||
13(Design & Contingencies - $40,000) |
| |||||
14(B) Construct new garage parking deck at |
| |||||
16Project Allocation | 3,300,000 | |||||
17(Base Project Allocation - $3,000,000) |
| |||||
18(Design & Contingencies - $300,000) |
| |||||
19(C) Renovate and expand Montgomery County |
| |||||
23Project Allocation | 825,000 | |||||
24(Base Program Allocation - $750,000) |
| |||||
25(Design & Contingencies - $75,000) |
| |||||
26(D) Renovate and expand District 6-0 |
| |||||
1Project Allocation | 2,200,000 | |||||
2(Base Project Allocation - $2,000,000) |
| |||||
3(Design & Contingencies - $200,000) |
| |||||
4(E) Construction of new salt storage |
| |||||
7Project Allocation | 2,000,000 | |||||
8(Base Project Allocation - $1,750,000) |
| |||||
9(Design & Contingencies - $250,000) |
| |||||
10(F) Renovate and expand Montgomery County |
| |||||
16Project Allocation | 1,400,000 | |||||
17(Base Project Allocation - $1,250,000) |
| |||||
18(Design & Contingencies - $150,000) |
| |||||
19(G) Renovate and expand Montgomery County |
| |||||
23Project Allocation | 1,500,000 | |||||
24(Base Project Allocation - $1,275,000) |
| |||||
25(Design & Contingencies - $225,000) |
| |||||
26(xiii.1) Montour County |
| |||||
27(A) Demolish and construct new storage |
| |||||
1Project Allocation | 800,000 | |||||
2(Base Project Allocation - $700,000) |
| |||||
3(Design & Contingencies - $100,000) |
| |||||
4(B) Renovate and expand Rest Site 35, |
| |||||
9Project Allocation | 2,500,000 | |||||
10(Base Project Allocation - $2,200,000) |
| |||||
11(Design & Contingencies - $300,000) |
| |||||
12(C) Renovate and expand Rest Site 36, |
| |||||
17Project Allocation | 2,500,000 | |||||
18(Base Project Allocation - $2,200,000) |
| |||||
19(Design & Contingencies - $300,000) |
| |||||
20(xiii.2) Northampton County |
| |||||
21(A) Construct new salt storage buildings, |
| |||||
25Project Allocation | 15,000,000 | |||||
| ||||||
28(Land Allocation - $1,000,000) |
| |||||
29(Design & Contingencies - $2,250,000) |
| |||||
30(B) Renovate and expand current
1Northampton County Maintenance Garage, |
| |||||
4Project Allocation | 2,000,000 | |||||
5(Base Project Allocation - $1,700,000) |
| |||||
6(Design & Contingencies - $300,000) |
| |||||
7(C) Construct new salt storage building |
| |||||
10Project Allocation | 350,000 | |||||
11(Base Project Allocation - $300,000) |
| |||||
12(Design & Contingencies - $50,000) |
| |||||
13(xiii.3) Northumberland County |
| |||||
14(A) Demolish and construct new storage |
| |||||
18Project Allocation | 1,600,000 | |||||
19(Base Project Allocation - $1,400,000) |
| |||||
20(Design & Contingencies - $200,000) |
| |||||
21(B) Construct new maintenance garage, |
| |||||
25Project Allocation | 15,000,000 | |||||
| ||||||
28(Land Allocation - $1,000,000) |
| |||||
29(Design & Contingencies - $2,250,000) |
| |||||
30(C) Renovate and expand Northumberland
1County Maintenance Garage, including |
| |||||
5Project Allocation | 2,000,000 | |||||
6(Base Project Allocation - $1,700,000) |
| |||||
7(Design & Contingencies - $300,000) |
| |||||
8(xiv) Perry County |
| |||||
9(A) Develop new stockpile facility in |
| |||||
12Project Allocation | 2,220,000 | |||||
13(Base Project Allocation - $2,000,000) |
| |||||
14(Land Allocation - $20,000) |
| |||||
15(Design & Contingencies - $200,000) |
| |||||
16(B) Demolish and construct new salt |
| |||||
19Project Allocation | 1,200,000 | |||||
20(Base Project Allocation - $1,050,000) |
| |||||
21(Design & Contingencies - $150,000) |
| |||||
22(C) Develop new stockpile, including site |
| |||||
24Project Allocation | 3,000,000 | |||||
25(Base Project Allocation - $1,750,000) |
| |||||
26(Land Allocation - $750,000) |
| |||||
27(Design & Contingencies - $500,000) |
| |||||
28(xiv.1) Philadelphia County |
| |||||
29(A) Construction of new salt storage
1Maintenance Facility |
| |||||
2Project Allocation | 400,000 | |||||
3(Base Project Allocation - $350,000) |
| |||||
4(Design & Contingencies - $50,000) |
| |||||
5(B) Renovate and expand Philadelphia |
| |||||
9Project Allocation | 2,000,000 | |||||
10(Base Project Allocation - $1,700,000) |
| |||||
11(Design & Contingencies - $300,000) |
| |||||
12(C) Demolish and construct new salt |
| |||||
16Project Allocation | 400,000 | |||||
17(Base Project Allocation - $350,000) |
| |||||
18(Design & Contingencies - $50,000) |
| |||||
19(D) Renovate and expand Philadelphia |
| |||||
25Project Allocation | 1,400,000 | |||||
26(Base Project Allocation - $1,250,000) |
| |||||
27(Design & Contingencies - $150,000) |
| |||||
28(xiv.2) Pike County |
| |||||
29(A) Construct new salt storage building
1Maintenance Facility |
| |||||
2Project Allocation | 400,000 | |||||
3(Base Project Allocation - $350,000) |
| |||||
4(Design & Contingencies - $50,000) |
| |||||
5(B) Renovate and expand Welcome Center |
| |||||
10Project Allocation | 2,000,000 | |||||
11(Base Project Allocation - $1,800,000) |
| |||||
12(Design & Contingencies - $200,000) |
| |||||
13(C) Renovate and expand Rest Site 61, |
| |||||
18Project Allocation | 2,500,000 | |||||
19(Base Project Allocation - $2,200,000) |
| |||||
20(Design & Contingencies - $300,000) |
| |||||
21(D) Renovate and expand Rest Site 62, |
| |||||
26Project Allocation | 2,500,000 | |||||
27(Base Project Allocation - $2,200,000) |
| |||||
28(Design & Contingencies - $300,000) |
| |||||
29(E) Removal and roof replacement system
1Welcome Center |
| |||||
2Project Allocation | 650,000 | |||||
3(Base Project Allocation - $600,000) |
| |||||
4(Design & Contingencies - $50,000) |
| |||||
5(xiv.3) Potter County |
| |||||
6(A) Renovate and expand current Potter |
| |||||
8Project Allocation | 2,000,000 | |||||
9(Base Project Allocation - $1,700,000) |
| |||||
10(Design & Contingencies - $300,000) |
| |||||
11(B) Demolish and construct two new |
| |||||
14Project Allocation | 1,050,000 | |||||
15(Base Project Allocation - $900,000) |
| |||||
16(Design & Contingencies - $150,000) |
| |||||
17(xv) Schuylkill County |
| |||||
18(A) Renovate and expand Schuylkill County |
| |||||
22Project Allocation | 1,150,000 | |||||
23(Base Project Allocation - $1,000,000) |
| |||||
24(Design & Contingencies - $150,000) |
| |||||
25(B) Renovate and expand current |
| |||||
29Project Allocation | 1,500,000 | |||||
30(Base Project Allocation - $1,275,000) |
| |||||
1(Design & Contingencies - $225,000) |
| |||||
2(C) Construct new salt storage building |
| |||||
5Project Allocation | 400,000 | |||||
6(Base Project Allocation - $350,000) |
| |||||
7(Design & Contingencies - $50,000) |
| |||||
8(D) Renovate and expand Schuylkill County |
| |||||
14Project Allocation | 1,400,000 | |||||
15(Base Project Allocation - $1,250,000) |
| |||||
16(Design & Contingencies - $150,000) |
| |||||
17(xv.1) Snyder County |
| |||||
18(A) Demolish and construct new storage |
| |||||
22Project Allocation | 800,000 | |||||
23(Base Project Allocation - $700,000) |
| |||||
24(Design & Contingencies - $100,000) |
| |||||
25(B) Renovate and expand Snyder County |
| |||||
1Project Allocation | 1,400,000 | |||||
2(Base Project Allocation - $1,250,000) |
| |||||
3(Design & Contingencies - $150,000) |
| |||||
4(xv.2) Somerset County |
| |||||
5(A) Demolish and construct new salt |
| |||||
8Project Allocation | 1,200,000 | |||||
9(Base Project Allocation - $1,050,000) |
| |||||
10(Design & Contingencies - $150,000) |
| |||||
11(B) Develop new stockpile, including site |
| |||||
13Project Allocation | 3,000,000 | |||||
14(Base Project Allocation - $1,750,000) |
| |||||
15(Land Allocation - $750,000) |
| |||||
16(Design & Contingencies - $500,000) |
| |||||
17(C) Renovate and expand Somerset County |
| |||||
21Project Allocation | 2,500,000 | |||||
22(Base Project Allocation - $2,125,000) |
| |||||
23(Design & Contingencies - $375,000) |
| |||||
24(D) Renovate and expand current drivers |
| |||||
30Project Allocation | 1,400,000 | |||||
1(Base Project Allocation - $1,250,000) |
| |||||
2(Design & Contingencies - $150,000) |
| |||||
3(xv.3) Sullivan County |
| |||||
4(A) Renovate and expand current Sullivan |
| |||||
8Project Allocation | 1,500,000 | |||||
9(Base Project Allocation - $1,275,000) |
| |||||
10(Design & Contingencies - $225,000) |
| |||||
11(B) Demolish and construct two new |
| |||||
15Project Allocation | 800,000 | |||||
16(Base Project Allocation - $700,000) |
| |||||
17(Design & Contingencies - $100,000) |
| |||||
18(xv.4) Susquehanna County |
| |||||
19(A) Renovate and expand current |
| |||||
23Project Allocation | 2,500,000 | |||||
24(Base Project Allocation - $2,100,000) |
| |||||
25(Design & Contingencies - $400,000) |
| |||||
26(B) Reskin metal building at Susquehanna |
| |||||
28Project Allocation | 350,000 | |||||
29(Base Project Allocation - $300,000) |
| |||||
30(Design & Contingencies - $50,000) |
| |||||
1(C) Construct new salt storage buildings |
| |||||
5Project Allocation | 800,000 | |||||
6(Base Project Allocation - $700,000) |
| |||||
7(Design & Contingencies - $100,000) |
| |||||
8(D) Renovate and expand Rest Site 56, |
| |||||
13Project Allocation | 2,500,000 | |||||
14(Base Project Allocation - $2,200,000) |
| |||||
15(Design & Contingencies - $300,000) |
| |||||
16(E) Renovate and expand Welcome Center |
| |||||
21Project Allocation | 2,000,000 | |||||
22(Base Project Allocation - $1,800,000) |
| |||||
23(Design & Contingencies - $200,000) |
| |||||
24(xv.5) Tioga County |
| |||||
25(A) Renovate and expand current Tioga |
| |||||
29Project Allocation | 2,500,000 | |||||
30(Base Project Allocation - $2,125,000) |
| |||||
1(Design & Contingencies - $375,000) |
| |||||
2(B) Construct new Tioga County |
| |||||
7Project Allocation | 15,000,000 | |||||
| ||||||
10(Land Allocation - $1,000,000) |
| |||||
11(Design & Contingencies - $2,250,000) |
| |||||
12(C) Demolish and construct new storage |
| |||||
16Project Allocation | 1,200,000 | |||||
17(Base Project Allocation - $1,050,000) |
| |||||
18(Design & Contingencies - $150,000) |
| |||||
19(D) Renovate and expand Welcome Center |
| |||||
24Project Allocation | 2,000,000 | |||||
25(Base Project Allocation - $1,800,000) |
| |||||
26(Design & Contingencies - $200,000) |
| |||||
27(xv.6) Union County |
| |||||
28(A) Renovate and expand current Union
1upgrade |
| |||||
2Project Allocation | 2,500,000 | |||||
3(Base Project Allocation - $2,125,000) |
| |||||
4(Design & Contingencies - $375,000) |
| |||||
5(B) Demolish and construct new storage |
| |||||
9Project Allocation | 400,000 | |||||
10(Base Project Allocation - $350,000) |
| |||||
11(Design & Contingencies - $50,000) |
| |||||
12(xv.7) Venango County |
| |||||
13(A) Construct new county maintenance |
| |||||
18Project Allocation | 15,000,000 | |||||
| ||||||
21(Land Allocation - $1,000,000) |
| |||||
22(Design & Contingencies - $2,250,000) |
| |||||
| ||||||
25Project Allocation | 400,000 | |||||
26(Base Project Allocation - $350,000) |
| |||||
27(Design & Contingencies - $50,000) |
| |||||
28(C) Demolish and construct new storage |
| |||||
1Project Allocation | 400,000 | |||||
2(Base Project Allocation - $350,000) |
| |||||
3(Design & Contingencies - $50,000) |
| |||||
4(D) Renovate and expand Rest Site 21, |
| |||||
9Project Allocation | 2,500,000 | |||||
10(Base Project Allocation - $2,200,000) |
| |||||
11(Design & Contingencies - $300,000) |
| |||||
12(E) Renovate and expand Rest Site 22, |
| |||||
17Project Allocation | 2,500,000 | |||||
18(Base Project Allocation - $2,200,000) |
| |||||
19(Design & Contingencies - $300,000) |
| |||||
20(F) Renovate and expand current Venango |
| |||||
24Project Allocation | 2,500,000 | |||||
25(Base Project Allocation - $2,125,000) |
| |||||
26(Design & Contingencies - $375,000) |
| |||||
27(G) Renovate and expand Venango County |
| |||||
3Project Allocation | 1,400,000 | |||||
4(Base Project Allocation - $1,250,000) |
| |||||
5(Design & Contingencies - $150,000) |
| |||||
6(xv.8) Warren County |
| |||||
7(A) Demolish and construct new storage |
| |||||
11Project Allocation | 1,800,000 | |||||
12(Base Project Allocation - $1,550,000) |
| |||||
13(Design & Contingencies - $250,000) |
| |||||
14(B) Renovate and expand Warren County |
| |||||
20Project Allocation | 1,400,000 | |||||
21(Base Project Allocation - $1,250,000) |
| |||||
22(Design & Contingencies - $150,000) |
| |||||
23(C) Renovate and expand Warren County |
| |||||
27Project Allocation | 2,500,000 | |||||
28(Base Project Allocation - $2,125,000) |
| |||||
29(Design & Contingencies - $375,000) |
| |||||
30(xvi) Washington County |
| |||||
1(A) Develop new stockpile facility, |
| |||||
4Project Allocation | 2,220,000 | |||||
5(Base Project Allocation - $2,000,000) |
| |||||
6(Land Allocation - $20,000) |
| |||||
7(Design & Contingencies - $200,000) |
| |||||
8(B) Develop new stockpile facility at |
| |||||
11Project Allocation | 2,220,000 | |||||
12(Base Project Allocation - $2,000,000) |
| |||||
13(Land Allocation - $20,000) |
| |||||
14(Design & Contingencies - $200,000) |
| |||||
15(C) Demolish and construct new salt |
| |||||
19Project Allocation | 1,200,000 | |||||
20(Base Project Allocation - $1,050,000) |
| |||||
21(Design & Contingencies - $150,000) |
| |||||
22(D) Renovate and expand Welcome Center |
| |||||
27Project Allocation | 2,500,000 | |||||
28(Base Project Allocation - $2,200,000) |
| |||||
29(Design & Contingencies - $300,000) |
| |||||
30(xvi.1) Wayne County |
| |||||
1(A) Renovate and expand current Wayne |
| |||||
5Project Allocation | 2,500,000 | |||||
6(Base Project Allocation - $2,100,000) |
| |||||
7(Design & Contingencies - $400,000) |
| |||||
8(B) Reskin metal building at Wayne County |
| |||||
10Project Allocation | 350,000 | |||||
11(Base Project Allocation - $300,000) |
| |||||
12(Design & Contingencies - $50,000) |
| |||||
13(C) Construct new salt storage buildings |
| |||||
16Project Allocation | 800,000 | |||||
17(Base Project Allocation - $700,000) |
| |||||
18(Design & Contingencies - $100,000) |
| |||||
19(xvi.2) Westmoreland County |
| |||||
20(A) Construct new salt storage building |
| |||||
23Project Allocation | 400,000 | |||||
24(Base Project Allocation - $380,000) |
| |||||
25(Design & Contingencies - $20,000) |
| |||||
| ||||||
28Project Allocation | 325,000 | |||||
29(Base Project Allocation - $300,000) |
| |||||
30(Design & Contingencies - $25,000) |
| |||||
1(C) Purchase additional property for |
| |||||
4Project Allocation | 1,000,000 | |||||
5(Land Allocation - $1,000,000) |
| |||||
6(D) Rehabilitate and expand 12-5 |
| |||||
9Project Allocation | 3,000,000 | |||||
10(Base Project Allocation - $2,650,000) |
| |||||
11(Design & Contingencies - $350,000) |
| |||||
12(E) Demolish and construct new salt |
| |||||
16Project Allocation | 2,400,000 | |||||
17(Base Project Allocation - $2,100,000) |
| |||||
18(Design & Contingencies - $300,000) |
| |||||
19(xvi.3) Wyoming County |
| |||||
20(A) Renovate and expand current Wyoming |
| |||||
24Project Allocation | 2,500,000 | |||||
25(Base Project Allocation - $2,100,000) |
| |||||
26(Design & Contingencies - $400,000) |
| |||||
27(xvii) York County |
| |||||
28(A) Develop a new stockpile facility, |
| |||||
1Project Allocation | 2,220,000 | |||||
2(Base Project Allocation - $2,000,000) |
| |||||
3(Land Allocation - $20,000) |
| |||||
4(Design & Contingencies - $200,000) |
| |||||
5(B) Construct new vehicle wash building |
| |||||
7Project Allocation | 690,000 | |||||
8(Base Project Allocation - $600,000) |
| |||||
9(Design & Contingencies - $90,000) |
| |||||
10(C) Develop new maintenance garage, |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $3,000,000) |
| |||||
15(Land Allocation - $1,500,000) |
| |||||
16(Design & Contingencies - $500,000) |
| |||||
17(D) Renovate and expand current York |
| |||||
21Project Allocation | 2,000,000 | |||||
22(Base Project Allocation - $1,700,000) |
| |||||
23(Design & Contingencies - $300,000) |
| |||||
24(E) Demolish and construct new salt |
| |||||
27Project Allocation | 3,200,000 | |||||
28(Base Project Allocation - $2,800,000) |
| |||||
29(Design & Contingencies - $400,000) |
| |||||
30(F) Develop new stockpile, including site
1purchase, design and construction |
| |||||
2Project Allocation | 3,000,000 | |||||
3(Base Project Allocation - $1,750,000) |
| |||||
4(Land Allocation - $750,000) |
| |||||
5(Design & Contingencies - $500,000) |
| |||||
6(G) Construct new welcome center, |
| |||||
9Project Allocation | 10,000,000 | |||||
10(Base Project Allocation - $7,500,000) |
| |||||
11(Land Allocation - $1,000,000) |
| |||||
12(Design & Contingencies - $1,500,000) |
| |||||
13(H) Renovate and expand Welcome Center |
| |||||
18Project Allocation | 2,000,000 | |||||
19(Base Project Allocation - $1,800,000) |
| |||||
20(Design & Contingencies - $200,000) |
| |||||
21(xviii) Montgomery and Philadelphia Counties |
| |||||
22(A) City Avenue Special Services |
| |||||
29Project Allocation | 10,000,000 | |||||
30(Base Project Allocation -
1$10,000,000) |
|
2(b) Port projects.--Additional capital projects in the
3category of improvement projects for ports to be constructed or
4acquired by the Department of Transportation, its successors or
5assigns, and to be financed by the incurring of debt, are hereby
6itemized, together with their respective estimated financial
7costs, as follows:
9Project | Total Project Allocation |
10(1) Erie County |
|
11(i) Erie Inland Port |
|
12(A) Construct rail improvements and ship |
|
15Project Allocation | 9,000,000 |
16(Base Project Allocation - $9,000,000) |
|
17(B) Construct rail improvements and |
|
20Project Allocation | 12,000,000 |
|
23Section 4. Itemization of furniture and equipment projects.
24Additional capital projects in the category of public
25improvement projects consisting of the acquisition of movable
26furniture and equipment to complete public improvement projects
27and to be purchased by the Department of General Services, its
28successor or assigns and to be financed by the incurring of debt
29are hereby itemized, together with their respective estimated
30financial costs, as follows:
2Project | Total Project Allocation | |||||
| ||||||
5(i) Kinzua Bridge State Park |
| |||||
6(A) Original furniture and equipment for |
| |||||
9Project Allocation | 3,000,000 | |||||
10(Base Project Allocation - $2,400,000) |
| |||||
11(Design & Contingencies - $600,000) |
| |||||
12(ii) Ohiopyle State Park |
| |||||
13(A) Original furniture and equipment for |
| |||||
16Project Allocation | 220,000 | |||||
17(Base Project Allocation - $220,000) |
| |||||
18(iii) S. B. Elliott State Park |
| |||||
19(A) Additional funding for purchase of |
| |||||
23Project Allocation | 3,500,000 | |||||
24(Base Project Allocation - $2,800,000) |
| |||||
25(Design & Contingencies - $700,000) |
| |||||
26(iv) Sinnemahoning State Park |
| |||||
27(A) Purchase of exhibits, furnishings and |
| |||||
30Project Allocation | 2,000,000 | |||||
1(Base Project Allocation - $1,600,000) |
| |||||
2(Design & Contingencies - $400,000) |
| |||||
3(2) Department of Education |
| |||||
4(i) Lincoln University |
| |||||
5(A) Original furniture and equipment |
| |||||
8Project Allocation | 4,000,000 | |||||
9(Base Project Allocation - $3,200,000) |
| |||||
10(Design & Contingencies - $800,000) |
| |||||
11(B) Provide necessary furniture and |
| |||||
14Project Allocation | 5,000,000 | |||||
15(Base Project Allocation - $4,000,000) |
| |||||
16(Design & Contingencies - $1,000,000) |
| |||||
17(ii) Temple University |
| |||||
18(A) Original furniture and equipment |
| |||||
21Project Allocation | 450,000 | |||||
22(Base Project Allocation - $360,000) |
| |||||
23(Design & Contingencies - $90,000) |
| |||||
24(B) Original furniture and equipment |
| |||||
27Project Allocation | 300,000 | |||||
28(Base Project Allocation - $300,000) |
| |||||
29(iii) Thaddeus Stevens College of Technology |
| |||||
30(A) Original furniture and equipment
1associated with design and |
| |||||
3Project Allocation | 2,000,000 | |||||
4(Base Project Allocation - $2,000,000) |
| |||||
5(iv) The Pennsylvania State University |
| |||||
6(A) Original furniture and equipment for |
| |||||
9Project Allocation | 8,100,000 | |||||
10(Base Project Allocation - $8,100,000) |
| |||||
11(B) Original furniture and equipment for |
| |||||
15Project Allocation | 1,500,000 | |||||
16(Base Project Allocation - $1,500,000) |
| |||||
17(C) Original furniture and equipment for |
| |||||
20Project Allocation | 1,000,000 | |||||
21(Base Project Allocation - $1,000,000) |
| |||||
22(D) Original furniture and equipment for |
| |||||
25Project Allocation | 7,700,000 | |||||
26(Base Project Allocation - $7,700,000) |
| |||||
27(E) Additional funding for furniture and |
| |||||
30Project Allocation | 1,500,000 | |||||
1(Base Project Allocation - $1,500,000) |
| |||||
2(F) Original furniture and equipment for |
| |||||
4Project Allocation | 13,000,000 | |||||
| ||||||
7(G) Additional funding for furniture and |
| |||||
9Project Allocation | 2,250,000 | |||||
10(Base Project Allocation - $2,250,000) |
| |||||
11(H) Capital renewal for Kostos Building |
| |||||
12Project Allocation | 1,800,000 | |||||
13(Base Project Allocation - $1,800,000) |
| |||||
14(I) Capital renewal for Baker Engineering |
| |||||
16Project Allocation | 1,400,000 | |||||
17(Base Project Allocation - $1,400,000) |
| |||||
18(J) Original furniture and equipment for |
| |||||
20Project Allocation | 3,300,000 | |||||
21(Base Project Allocation - $3,300,000) |
| |||||
22(K) Original furniture and equipment for |
| |||||
25Project Allocation | 1,600,000 | |||||
26(Base Project Allocation - $1,600,000) |
| |||||
27(L) Original furniture and equipment for |
| |||||
29Project Allocation | 2,400,000 | |||||
30(Base Project Allocation - $2,400,000) |
| |||||
1(M) Capital renewal for waste water |
| |||||
4Project Allocation | 1,000,000 | |||||
5(Base Project Allocation - $1,000,000) |
| |||||
6(N) Additional funding for furniture and |
| |||||
9Project Allocation | 1,000,000 | |||||
10(Base Project Allocation - $1,000,000) |
| |||||
11(O) Original furniture and equipment for |
| |||||
14Project Allocation | 1,500,000 | |||||
15(Base Project Allocation - $1,500,000) |
| |||||
16(P) Provide for necessary furniture and |
| |||||
20Project Allocation | 2,400,000 | |||||
21(Base Project Allocation - $2,400,000) |
| |||||
<-22(Q) Original furniture and equipment for |
| |||||
26Project Allocation | 12,000,000 | |||||
| ||||||
29(2.1) Department of General Services |
| |||||
30(i) Family Court Complex, Philadelphia |
| |||||
1(A) Provide the necessary furniture and |
| |||||
5Project Allocation | 22,000,000 | |||||
| ||||||
| ||||||
10(i) Landis Valley Village and Museum |
| |||||
11(A) Original furniture and equipment for |
| |||||
13Project Allocation | 1,500,000 | |||||
14(Base Project Allocation - $1,500,000) |
| |||||
15(ii) Railroad Museum of Pennsylvania |
| |||||
16(A) Original equipment for new rolling |
| |||||
18Project Allocation | 1,200,000 | |||||
19(Base Project Allocation - $1,200,000) |
| |||||
| ||||||
22(A) Provide original furniture and |
| |||||
25Project Allocation | 200,000 | |||||
26(Base Project Allocation - $200,000) |
| |||||
27(4) State System of Higher Education |
| |||||
28(i) Bloomsburg University |
| |||||
29(A) Original furniture and equipment
1McCormick Center |
| |||||
2Project Allocation | 2,500,000 | |||||
3(Base Project Allocation - $2,500,000) |
| |||||
4(ii) California University of Pennsylvania |
| |||||
5(A) Original furniture and equipment |
| |||||
8Project Allocation | 2,000,000 | |||||
9(Base Project Allocation - $2,000,000) |
| |||||
10(B) Original furniture and equipment |
| |||||
13Project Allocation | 3,500,000 | |||||
14(Base Project Allocation - $3,500,000) |
| |||||
15(iii) Cheyney University |
| |||||
16(A) Original furniture and equipment |
| |||||
19Project Allocation | 5,000,000 | |||||
20(Base Project Allocation - $5,000,000) |
| |||||
21(iv) Clarion University |
| |||||
22(A) Original furniture and equipment |
| |||||
25Project Allocation | 4,000,000 | |||||
26(Base Project Allocation - $4,000,000) |
| |||||
27(v) East Stroudsburg University |
| |||||
28(A) Original furniture and equipment |
| |||||
1Project Allocation | 8,000,000 | |||||
2(Base Project Allocation - $8,000,000) |
| |||||
<-3(vi) Edinboro University |
| |||||
4(A) Original furniture and equipment |
| |||||
7Project Allocation | 500,000 | |||||
8(Base Project Allocation - $500,000) |
| |||||
9(vi) <-(vii) Indiana University of Pennsylvania |
| |||||
10(A) Original furniture and equipment |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $5,000,000) |
| |||||
15(B) Provide for necessary furniture and |
| |||||
18Project Allocation | 2,000,000 | |||||
19(Base Project Allocation - $2,000,000) |
| |||||
20(vii) <-(viii) Kutztown University |
| |||||
21(A) Original furniture and equipment |
| |||||
24Project Allocation | 3,000,000 | |||||
25(Base Project Allocation - $3,000,000) |
| |||||
26(B) Original furniture and equipment |
| |||||
29Project Allocation | 1,000,000 | |||||
30(Base Project Allocation - $1,000,000) |
| |||||
1(viii) <-(ix) Mansfield University |
| |||||
2(A) Original furniture and equipment |
| |||||
5Project Allocation | 2,000,000 | |||||
6(Base Project Allocation - $2,000,000) |
| |||||
7(ix) <-(x) Slippery Rock University |
| |||||
8(A) Original furniture and equipment |
| |||||
11Project Allocation | 2,800,000 | |||||
12(Base Project Allocation - $2,800,000) |
|
13Section 5. Itemization of transportation assistance projects.
14(a) Mass transit.--Additional capital projects in the
15category of transportation assistance projects for mass transit
16in which an interest is to be acquired or constructed by the
17Department of Transportation, its successors or assigns and to
18be financed by the incurring of debt are hereby itemized,
19together with their estimated financial costs, as follows:
21Project | Total Project Allocation | |||||
<-22(1) Adams County Transit Authority |
| |||||
23(i) Design, construction and other related
1of Gettysburg |
| |||||
2Project Allocation | 3,000,000 | |||||
3(Base Project Allocation - $3,000,000) |
| |||||
4(1) <-(1.1) Allegheny County |
| |||||
5(i) High-density redevelopment at new and |
| |||||
9Project Allocation | 20,000,000 | |||||
| ||||||
<-12(ii) Acquisition, construction, |
| |||||
16Project Allocation | 5,000,000 | |||||
17(Base Project Allocation - $5,000,000) |
| |||||
18(2) Area Transportation Authority |
| |||||
19(i) Provide for facility and facility |
| |||||
24Project Allocation | 2,253,000 | |||||
25(Base Project Allocation - $2,028,000) |
| |||||
26(Design & Contingencies - $225,000) |
| |||||
27(ii) Upgrade and renovate Dubois facility to |
| |||||
29Project Allocation | 959,000 | |||||
30(Base Project Allocation - $863,000) |
| |||||
1(Design & Contingencies - $96,000) |
| |||||
2(iii) Construct terminals |
| |||||
3Project Allocation | 1,162,000 | |||||
4(Base Project Allocation - $1,162,000) |
| |||||
5(iv) Mobility Management Center, to match |
| |||||
9Project Allocation | 1,066,000 | |||||
10(Base Project Allocation - $959,000) |
| |||||
11(Design & Contingencies - $107,000) |
| |||||
12(v) Bus Purchase Program, provide for |
| |||||
15Project Allocation | 2,464,000 | |||||
16(Base Project Allocation - $2,218,000) |
| |||||
17(Design & Contingencies - $246,000) |
| |||||
<-18(2.1) Beaver County Transit Authority |
| |||||
19(i) Construction, infrastructure and other |
| |||||
22Project Allocation | 2,000,000 | |||||
23(Base Project Allocation - $2,000,000) |
| |||||
24(3) Butler Transit Authority |
| |||||
25(i) Expand Cranberry Area Park and Ride |
| |||||
29Project Allocation | 450,000 | |||||
30(Base Project Allocation - $405,000) |
| |||||
1(Design & Contingencies - $45,000) |
| |||||
2(ii) Provide for infrastructure improvements, |
| |||||
9Project Allocation | 1,700,000 | |||||
10(Base Project Allocation - $1,700,000) |
| |||||
11(4) Cambria County Transit Authority |
| |||||
12(i) Replace transit facility in Johnstown to |
| |||||
14Project Allocation | 2,419,000 | |||||
15(Base Project Allocation - $2,177,000) |
| |||||
16(Design & Contingencies - $242,000) |
| |||||
17(ii) Construct transit facility |
| |||||
18Project Allocation | 3,871,000 | |||||
19(Base Project Allocation - $3,871,000) |
| |||||
20(iii) Construction and infrastructure |
| |||||
23Project Allocation | 7,000,000 | |||||
24(Base Project Allocation - $7,000,000) |
| |||||
| ||||||
27Project Allocation | 271,000 | |||||
28(Base Project Allocation - $244,000) |
| |||||
29(Design & Contingencies - $27,000) |
| |||||
30(v) Replace fare collection system |
| |||||
1Project Allocation | 78,000 | |||||
2(Base Project Allocation - $70,000) |
| |||||
3(Design & Contingencies - $8,000) |
| |||||
4(5) Capital Area Transit Authority |
| |||||
5(i) Replace CAT's transit facility to meet |
| |||||
<-7Project Allocation | 7,742,000 | |||||
8(Base Project Allocation - $6,968,000) |
| |||||
9(Design & Contingencies - $774,000) |
| |||||
<-10Project Allocation | 47,742,000 | |||||
| ||||||
13(Design & Contingencies - $4,774,000) |
| |||||
14(ii) Upgrade transportation technology for |
| |||||
17Project Allocation | 1,935,000 | |||||
18(Base Project Allocation - $1,742,000) |
| |||||
19(Design & Contingencies - $193,000) |
| |||||
20(6) Centre Area Transportation Authority |
| |||||
| ||||||
23Project Allocation | 968,000 | |||||
24(Base Project Allocation - $871,000) |
| |||||
25(Design & Contingencies - $97,000) |
| |||||
26(ii) Acquisition of replacement buses |
| |||||
27Project Allocation | 1,600,000 | |||||
28(Base Project Allocation - $1,600,000) |
| |||||
29(iii) Rehabilitate or replace various |
| |||||
1Project Allocation | 30,000,000 | |||||
| ||||||
4(Design & Contingencies - $6,000,000) |
| |||||
| ||||||
7Project Allocation | 5,700,000 | |||||
8(Base Project Allocation - $5,700,000) |
| |||||
9(7) County of Lackawanna Transit System |
| |||||
10(i) Acquisition, construction, infrastructure |
| |||||
14Project Allocation | 6,000,000 | |||||
15(Base Project Allocation - $6,000,000) |
| |||||
16(ii) Acquisition, construction, |
| |||||
19Project Allocation | 1,000,000 | |||||
20(Base Project Allocation - $1,000,000) |
| |||||
21(8) Crawford Area Transportation Authority |
| |||||
22(i) Construct steel structure sheltered bus |
| |||||
25Project Allocation | 387,000 | |||||
26(Base Project Allocation - $348,000) |
| |||||
27(Design & Contingencies - $39,000) |
| |||||
28(9) Erie Metropolitan Transit Authority |
| |||||
29(i) Construct new operations facility, |
| |||||
1Project Allocation | 1,796,000 | |||||
2(Base Project Allocation - $1,616,000) |
| |||||
3(Design & Contingencies - $180,000) |
| |||||
4(9.1) Lebanon Transit |
| |||||
5(i) Rehabilitate building and grounds, |
| |||||
7Project Allocation | 406,000 | |||||
8(Base Project Allocation - $365,000) |
| |||||
9(Design & Contingencies - $41,000) |
| |||||
| ||||||
12(i) Construct new operations facility, |
| |||||
15Project Allocation | 2,517,000 | |||||
16(Base Project Allocation - $2,265,000) |
| |||||
17(Design & Contingencies - $252,000) |
| |||||
18(ii) Transit vehicle purchase, provide |
| |||||
20Project Allocation | 1,646,000 | |||||
21(Base Project Allocation - $1,481,000) |
| |||||
22(Design & Contingencies - $165,000) |
| |||||
<-23(10.1) Lycoming County |
| |||||
24(i) Construction, infrastructure and other |
| |||||
1Project Allocation | 2,800,000 | |||||
2(Base Project Allocation - $2,800,000) |
| |||||
3(11) Mid-County Transit Authority |
| |||||
4(i) Construct bus storage facility |
| |||||
5Project Allocation | 215,000 | |||||
6(Base Project Allocation - $215,000) |
| |||||
7(12) Mid Mon Valley Transit Authority |
| |||||
8(i) Rehabilitate bus storage, phase II, |
| |||||
12Project Allocation | 1,160,000 | |||||
13(Base Project Allocation - $1,044,000) |
| |||||
14(Design & Contingencies - $116,000) |
| |||||
15(ii) Construct Donora Phase II project |
| |||||
16Project Allocation | 965,000 | |||||
17(Base Project Allocation - $965,000) |
| |||||
18(iii) Replace revenue rolling stock that has |
| |||||
22Project Allocation | 364,000 | |||||
23(Base Project Allocation - $328,000) |
| |||||
24(Design & Contingencies - $36,000) |
| |||||
25(13) Monroe County Transit Agency |
| |||||
| ||||||
28Project Allocation | 968,000 | |||||
29(Base Project Allocation - $871,000) |
| |||||
30(Design & Contingencies - $97,000) |
| |||||
1(14) Montgomery County |
| |||||
2(i) Construction, infrastructure improvements |
| |||||
6Project Allocation | 10,000,000 | |||||
| ||||||
<-9(14.1) Northampton County |
| |||||
10(i) Installation of traffic light at |
| |||||
13Project Allocation | 450,000 | |||||
14(Base Project Allocation - $450,000) |
| |||||
15(15) Philadelphia County |
| |||||
16(i) Infrastructure improvements, including |
| |||||
19Project Allocation | 235,000 | |||||
20(Base Project Allocation - $235,000) |
| |||||
21(16) Port Authority of Allegheny County |
| |||||
22(i) FY 2011-2012 Section 5307 Program, |
| |||||
26Project Allocation | 7,341,000 | |||||
27(Base Project Allocation - $6,607,000) |
| |||||
28(Design & Contingencies - $734,000) |
| |||||
29(ii) FY 2011-2012 Section 5309 Program,
1components within Port Authority's rail |
| |||||
4Project Allocation | 6,000,000 | |||||
5(Base Project Allocation - $5,400,000) |
| |||||
6(Design & Contingencies - $600,000) |
| |||||
7(iii) FY 2011-2012 Section 5307 Flex Program, |
| |||||
10Project Allocation | 1,493,000 | |||||
11(Base Project Allocation - 1,344,000) |
| |||||
12(Design & Contingencies - 149,000) |
| |||||
13(iv) FY 2011-2012 Section 5309 Bus and Bus |
| |||||
17Project Allocation | 1,161,000 | |||||
18(Base Project Allocation - $1,045,000) |
| |||||
19(Design & Contingencies - $116,000) |
| |||||
20(v) Infrastructure Safety Renewal Program, to |
| |||||
24Project Allocation | 16,000,000 | |||||
| ||||||
27(Design & Contingencies - $1,600,000) |
| |||||
28(vi) Vehicle Overhaul Program |
| |||||
29Project Allocation | 7,419,000 | |||||
30(Base Project Allocation - $6,678,000) |
| |||||
1(Design & Contingencies - $741,000) |
| |||||
2(vii) FY 2011-2012 Section 5307 Program, for |
| |||||
6Project Allocation | 13,706,000 | |||||
| ||||||
9(Design & Contingencies - $1,371,000) |
| |||||
10(viii) FY 2011-2012 Section 5309 Program, for |
| |||||
16Project Allocation | 11,756,000 | |||||
| ||||||
19(Design & Contingencies - $1,176,000) |
| |||||
20(ix) FY 2011-2012 Section 5307 Flex Program, |
| |||||
23Project Allocation | 1,493,000 | |||||
24(Base Project Allocation - $1,344,000) |
| |||||
25(Design & Contingencies - $149,000) |
| |||||
26(x) FY 2011-2012 Section 5309 Bus and Bus |
| |||||
1Project Allocation | 1,403,000 | |||||
2(Base Project Allocation - $1,263,000) |
| |||||
3(Design & Contingencies - $140,000) |
| |||||
4(xi) Infrastructure Safety Renewal Program, |
| |||||
8Project Allocation | 45,484,000 | |||||
| ||||||
11(Design & Contingencies - $4,484,000) |
| |||||
12(xii) Vehicle Overhaul Program, to provide |
| |||||
14Project Allocation | 5,000,000 | |||||
15(Base Project Allocation - $4,500,000) |
| |||||
16(Design & Contingencies - $500,000) |
| |||||
17(xiii) Section 5307 Program, to match |
| |||||
22Project Allocation | 4,723,000 | |||||
23(Base Project Allocation - $4,251,000) |
| |||||
24(Design & Contingencies - $472,000) |
| |||||
25(xiv) Section 5309 Program, to match Federal |
| |||||
29Project Allocation | 678,000 | |||||
30(Base Project Allocation - $610,000) |
| |||||
1(Design & Contingencies - $68,000) |
| |||||
2(xv) Section 5307 Program, to match |
| |||||
5Project Allocation | 1,493,000 | |||||
6(Base Project Allocation - $1,344,000) |
| |||||
7(Design & Contingencies - $149,000) |
| |||||
8(xvi) Federal Grant Program, to match |
| |||||
12Project Allocation | 5,601,000 | |||||
13(Base Project Allocation - $5,041,000) |
| |||||
14(Design & Contingencies - $560,000) |
| |||||
15(16.1) Red Rose Transit Authority |
| |||||
| ||||||
18Project Allocation | 1,887,000 | |||||
19(Base Project Allocation - $1,698,000) |
| |||||
20(Design & Contingencies - $189,000) |
| |||||
21(17) River Valley Transit |
| |||||
22(i) Expand Trade and Transit Center and |
| |||||
25Project Allocation | 1,161,000 | |||||
26(Base Project Allocation - $1,045,000) |
| |||||
27(Design & Contingencies - $116,000) |
| |||||
28(ii) Expand Trade and Transit Center |
| |||||
29Project Allocation | 1,459,000 | |||||
30(Base Project Allocation - $1,313,000) |
| |||||
1(Design & Contingencies - $146,000) |
| |||||
2(iii) Construct compressed natural gas |
| |||||
5Project Allocation | 1,042,000 | |||||
6(Base Project Allocation - $937,800) |
| |||||
7(Design & Contingencies - $104,200) |
| |||||
| ||||||
10(i) FFY 2012 Section 5307 Formula Program of |
| |||||
16Project Allocation | 23,831,000 | |||||
| ||||||
19(Design & Contingencies - $2,383,000) |
| |||||
20(ii) FFY 2012 Section 5309 Rail Modernization |
| |||||
26Project Allocation | 24,170,000 | |||||
| ||||||
29(Design & Contingencies - $2,417,000) |
| |||||
30(iii) FFY 2012 Bus Purchase Program, |
| |||||
3Project Allocation | 4,133,000 | |||||
4(Base Project Allocation - $3,720,000) |
| |||||
5(Design & Contingencies - $413,000) |
| |||||
6(iv) FFY 2012 Federal Highway Flex Program, |
| |||||
11Project Allocation | 774,000 | |||||
12(Base Project Allocation - $697,000) |
| |||||
13(Design & Contingencies - $77,000) |
| |||||
14(v) Federal Competitive Grant Program, to |
| |||||
18Project Allocation | 15,839,000 | |||||
| ||||||
21(Design & Contingencies - $1,584,000) |
| |||||
22(vi) FY 2012-2013 State of Good Repair |
| |||||
28Project Allocation | 24,174,000 | |||||
| ||||||
1(Design & Contingencies - $2,419,000) |
| |||||
2(vii) Infrastructure Safety Renewal Program, |
| |||||
6Project Allocation | 31,936,000 | |||||
| ||||||
9(Design & Contingencies - $3,194,000) |
| |||||
10(viii) FY 2011-2012 Vehicle Overhaul Program |
| |||||
11Project Allocation | 53,226,000 | |||||
| ||||||
14(Design & Contingencies - $5,323,000) |
| |||||
15(ix) FFY 2013 Formula Program of Projects, to |
| |||||
21Project Allocation | 23,226,000 | |||||
| ||||||
24(Design & Contingencies - $2,323,000) |
| |||||
25(x) FFY 2013 Rail Modernization Program, to
1accessibility program |
| |||||
2Project Allocation | 23,226,000 | |||||
| ||||||
5(Design & Contingencies - $2,323,000) |
| |||||
6(xi) FFY 2013 Bus Purchase Program, to |
| |||||
9Project Allocation | 4,133,000 | |||||
10(Base Project Allocation - $3,720,000) |
| |||||
11(Design & Contingencies - $413,000) |
| |||||
12(xii) Federal Competitive Grant Program, to |
| |||||
17Project Allocation | 17,420,000 | |||||
| ||||||
20(Design & Contingencies - $1,742,000) |
| |||||
21(xiii) Federal Competitive Clean Fuel |
| |||||
27Project Allocation | 1,452,000 | |||||
28(Base Project Allocation - $1,307,000) |
| |||||
29(Design & Contingencies - $145,000) |
| |||||
30(xiv) FY 2013-2014 Safety Renewal Program, to
1provide funds to rehabilitate or replace |
| |||||
4Project Allocation | 33,872,000 | |||||
| ||||||
7(Design & Contingencies - $3,387,000) |
| |||||
8(xv) FY 2013-2014 State of Good Repair |
| |||||
13Project Allocation | 19,356,000 | |||||
| ||||||
16(Design & Contingencies - $1,936,000) |
| |||||
17(xvi) Vehicle Overhaul Program, to provide |
| |||||
21Project Allocation | 53,227,000 | |||||
| ||||||
24(Design & Contingencies - $5,323,000) |
| |||||
25(xvii) FY 2012-2013 State of Good Repair |
| |||||
30Project Allocation | 24,194,000 | |||||
| ||||||
3(Design & Contingencies - $2,419,000) |
| |||||
4(xviii) Infrastructure Safety Renewal |
| |||||
9Project Allocation | 31,936,000 | |||||
| ||||||
12(Design & Contingencies - $3,194,000) |
| |||||
13(xix) Vehicle Overhaul Program, to provide |
| |||||
17Project Allocation | 53,227,000 | |||||
| ||||||
20(Design & Contingencies - $5,323,000) |
| |||||
21(xx) FY 2012-2013 Infrastructure Safety |
| |||||
26Project Allocation | 31,936,000 | |||||
| ||||||
29(Design & Contingencies - $3,194,000) |
| |||||
30(xxi) Commuter rail expansion project, Phase
11 -- Elwyn to Wawa |
| |||||
2Project Allocation | 16,500,000 | |||||
| ||||||
5(Design & Contingencies - $1,500,000) |
| |||||
6(xxii) Commuter rail expansion project, Phase |
| |||||
8Project Allocation | 16,500,000 | |||||
| ||||||
11(Design & Contingencies - $1,500,000) |
| |||||
12(xxiii) Urbanized Area of Formula Program, to |
| |||||
16Project Allocation | 47,614,000 | |||||
| ||||||
19(Design & Contingencies - $4,761,000) |
| |||||
20(xxiv) State of Good Repair Program, to |
| |||||
25Project Allocation | 51,098,000 | |||||
| ||||||
28(Design & Contingencies - $5,110,000) |
| |||||
29(xxv) Bus and Bus Facilities Program, to
1buses and rehabilitate various facilities |
| |||||
3Project Allocation | 3,484,000 | |||||
4(Base Project Allocation - $3,136,000) |
| |||||
5(Design & Contingencies - $348,000) |
| |||||
6(xxvi) Bus Purchase Flex Program, to match |
| |||||
10Project Allocation | 8,267,000 | |||||
11(Base Project Allocation - $7,440,000) |
| |||||
12(Design & Contingencies - $827,000) |
| |||||
13(xxvii) Federal Grant Program, to match |
| |||||
17Project Allocation | 1,452,000 | |||||
18(Base Project Allocation - $1,307,000) |
| |||||
19(Design & Contingencies - $145,000) |
| |||||
20(xxviii) Infrastructure Safety Renewal |
| |||||
24Project Allocation | 67,744,000 | |||||
| ||||||
27(Design & Contingencies - $6,774,000) |
| |||||
28(xxix) Fiscal year 2014-2015 State of Good
1Overhaul Program and to rehabilitate or |
| |||||
4Project Allocation | 19,356,000 | |||||
| ||||||
7(Design & Contingencies - $1,936,000) |
| |||||
8(xxx) Vehicle Overhaul Program, to provide |
| |||||
11Project Allocation | 53,266,000 | |||||
| ||||||
14(Design & Contingencies - $5,323,000) |
| |||||
15(xxxi) Federal Grant Program, provide State |
| |||||
19Project Allocation | 4,839,000 | |||||
20(Base Project Allocation - $4,355,000) |
| |||||
21(Design & Contingencies - $484,000) |
| |||||
22(19) Department of Transportation |
| |||||
23(i) Vehicle and Capital Equipment Program, to |
| |||||
28Project Allocation | 50,000,000 | |||||
| ||||||
1(Design & Contingencies - $5,000,000) |
| |||||
2(ii) Provide funding for capital improvements |
| |||||
6Project Allocation | 15,000,000 | |||||
| ||||||
9(Design & Contingencies - $1,500,000) |
| |||||
10(iii) Vehicle and Capital Equipment Program, |
| |||||
15Project Allocation | 50,000,000 | |||||
| ||||||
18(Design & Contingencies - $5,000,000) |
| |||||
19(iv) Alternative Fuel Vehicles Program, |
| |||||
24Project Allocation | 50,000,000 | |||||
| ||||||
27(19.1) Washington City Transit |
| |||||
28(i) Improve transit facilities, to provide |
| |||||
30Project Allocation | 58,000 | |||||
1(Base Project Allocation - $52,000) |
| |||||
2(Design & Contingencies - $6,000) |
| |||||
3(ii) Purchase equipment, to provide for |
| |||||
6Project Allocation | 24,000 | |||||
7(Base Project Allocation - $22,000) |
| |||||
8(Design & Contingencies - $2,000) |
| |||||
9(20) York County Transportation Authority |
| |||||
10(i) Renovate transit operations |
| |||||
12Project Allocation | 8,710,000 | |||||
13(Base Project Allocation - $7,839,000) |
| |||||
14(Design & Contingencies - $871,000) |
| |||||
15(ii) Purchase buses, to provide for |
| |||||
17Project Allocation | 1,348,000 | |||||
18(Base Project Allocation - $1,213,000) |
| |||||
19(Design & Contingencies - $135,000) |
|
20(b) Rural and intercity rail.--Additional capital projects
21in the category of transportation assistance projects for rural
22and intercity rail service projects to be constructed or with
23respect to which an interest is to be acquired by the Department
24of Transportation, its successors or assigns and to be financed
25by the incurring of debt are hereby itemized, together with
26their respective estimated financial costs, as follows:
28Project | Total Project Allocation | |||||
29(1) Allegheny County |
| |||||
30(i) City of Pittsburgh |
| |||||
1(A) High-density redevelopment at new and |
| |||||
5Project Allocation | 20,000,000 | |||||
| ||||||
8(ii) Three Rivers Marine & Rail Terminals |
| |||||
9(A) Rail rehabilitation, including track 10infrastructure improvements, upgrade |
| |||||
14Project Allocation | 1,500,000 | |||||
15(Base Project Allocation - $1,500,000) |
| |||||
16(2) Allegheny, Fayette, Washington and |
| |||||
18(i) Wheeling & Lake Erie Railroad |
| |||||
19(A) Upgrade existing infrastructure and |
| |||||
28Project Allocation | 10,000,000 | |||||
| ||||||
1(3) Allegheny, Butler and Washington Counties |
| |||||
2(i) Allegheny Valley Railroad |
| |||||
3(A) Rehabilitate and build railroad |
| |||||
12Project Allocation | 8,000,000 | |||||
13(Base Project Allocation - $8,000,000) |
| |||||
14(3.1) Allegheny and Washington Counties |
| |||||
15(i) Pittsburgh and Ohio Central Railroad |
| |||||
16(A) Rehabilitation, including ties, rail, |
| |||||
21Project Allocation | 4,900,000 | |||||
22(Base Project Allocation - $4,900,000) |
| |||||
23(B) Rail construction or rehabilitation, |
| |||||
29Project Allocation | 7,000,000 | |||||
30(Base Project Allocation - $7,000,000) |
| |||||
1(4) Beaver County |
| |||||
2(i) Aliquippa and Ohio River Railroad |
| |||||
3(A) Rehabilitation, including ties, rail, |
| |||||
8Project Allocation | 3,500,000 | |||||
9(Base Project Allocation - $3,500,000) |
| |||||
10(B) Rail construction or rail |
| |||||
13Project Allocation | 7,000,000 | |||||
14(Base Project Allocation - $7,000,000) |
| |||||
15(5) Berks County |
| |||||
16(i) City of Reading |
| |||||
17(A) Rehabilitation, construction and |
| |||||
29Project Allocation | 5,000,000 | |||||
30(Base Project Allocation - $5,000,000) |
| |||||
1(ii) Colebrookdale Railroad |
| |||||
<-2(A) Rehabilitation of historic Civil War |
| |||||
8Project Allocation | 10,000,000 | |||||
| ||||||
<-11(A) Rehabilitation of railroad, including |
| |||||
20Project Allocation | 10,000,000 | |||||
| ||||||
23(iii) Richmond Township |
| |||||
24(A) Construction of an approximately |
| |||||
3Project Allocation | 921,000 | |||||
4(Base Project Allocation - $921,000) |
| |||||
5(6) Bucks County |
| |||||
6(i) Fairless Hills |
| |||||
7(A) Acquisition, infrastructure, |
| |||||
12Project Allocation | 5,750,000 | |||||
13(Base Project Allocation - $5,750,000) |
| |||||
| ||||||
16(A) Acquisition, infrastructure, |
| |||||
20Project Allocation | 5,000,000 | |||||
21(Base Project Allocation - $5,000,000) |
| |||||
22(iii) SMS Rail Lines |
| |||||
23(A) Expand service to current and future |
| |||||
30Project Allocation | 4,000,000 | |||||
1(Base Project Allocation - $4,000,000) |
| |||||
2(7) Cambria County |
| |||||
3(i) City of Johnstown |
| |||||
4(A) Rehabilitation, construction and |
| |||||
19Project Allocation | 10,000,000 | |||||
| ||||||
22(ii) County projects |
| |||||
23(A) Rehabilitation, construction and
1right-of-way acquisition, design, |
| |||||
8Project Allocation | 10,000,000 | |||||
| ||||||
<-11(B) Rehabilitation, construction and |
| |||||
14Project Allocation | 10,000,000 | |||||
| ||||||
17(7.1) Carbon County |
| |||||
<-18(i) Graymont, Inc., Pleasant Gap |
| |||||
19(A) Rail construction and rehabilitation, |
| |||||
25Project Allocation | 2,100,000 | |||||
26(Base Project Allocation - $2,100,000) |
| |||||
| ||||||
29(A) Nesquehoning bridge project, Phase 2, |
| |||||
3Project Allocation | 10,000,000 | |||||
| ||||||
<-6(7.2) Centre County |
| |||||
7(i) Titan Energy Park |
| |||||
8(A) Rail construction, rail sidings, |
| |||||
15Project Allocation | 5,000,000 | |||||
16(Base Project Allocation - $5,000,000) |
| |||||
17(7.2) <-(7.3) Clinton County |
| |||||
18(I) Clinton County Solid Waste Authority |
| |||||
19(A) Construction and related |
| |||||
23Project Allocation | 1,000,000 | |||||
24(Base Project Allocation - $1,000,000) |
| |||||
25(II) Clinton County Economic Partnership |
| |||||
26(A) Construct siding and loading |
| |||||
29Project Allocation | 1,000,000 | |||||
30(Base Project Allocation - $1,000,000) |
| |||||
1(7.3) <-(7.4) Crawford County |
| |||||
| ||||||
4(A) Infrastructure, construction and |
| |||||
10Project Allocation | 5,000,000 | |||||
11(Base Project Allocation - $5,000,000) |
| |||||
12(7.4) <-(7.5) Dauphin County |
| |||||
13(i) Steelton and Highspire Railroad |
| |||||
14(A) Rehabilitation of rail infrastructure |
| |||||
22Project Allocation | 8,000,000 | |||||
23(Base Project Allocation - $8,000,000) |
| |||||
<-24(7.6) Delaware County |
| |||||
25(i) Delaware County Redevelopment Authority |
| |||||
26(A) Construction, acquisition, railroad |
| |||||
1Project Allocation | 10,000,000 | |||||
| ||||||
4(ii) SEPTA Media/Elwyn Regional Rail |
| |||||
5(A) Construction, infrastructure, |
| |||||
9Project Allocation | 13,000,000 | |||||
| ||||||
12(8) Erie County |
| |||||
13(i) City of Erie |
| |||||
14(A) Construct rail improvements and ship |
| |||||
17Project Allocation | 9,000,000 | |||||
18(Base Project Allocation - $9,000,000) |
| |||||
19(B) Construct rail improvements and |
| |||||
22Project Allocation | 12,000,000 | |||||
| ||||||
25(9) Fayette and Westmoreland Counties |
| |||||
26(i) Southwest Pennsylvania Railroad Company |
| |||||
27(A) Rehabilitate and build railroad
1crossties, roadbed, drainage, |
| |||||
6Project Allocation | 11,500,000 | |||||
| ||||||
9(10) Lackawanna County |
| |||||
| ||||||
12(A) Purchase and install ties, ballast, |
| |||||
17Project Allocation | 1,500,000 | |||||
18(Base Project Allocation - $1,500,000) |
| |||||
| ||||||
21(A) Purchase and install ties, ballast, |
| |||||
26Project Allocation | 2,000,000 | |||||
27(Base Project Allocation - $2,000,000) |
| |||||
28(B) Purchase and install ties, ballast, |
| |||||
3Project Allocation | 1,250,000 | |||||
4(Base Project Allocation - $1,250,000) |
| |||||
5(iii) County of Lackawanna Transit System |
| |||||
6(A) Acquisition, construction, |
| |||||
9Project Allocation | 1,000,000 | |||||
10(Base Project Allocation - $1,000,000) |
| |||||
11(11) Lancaster County |
| |||||
<-12(i) Columbia Economic Development Corporation |
| |||||
13(A) Construction, infrastructure, |
| |||||
19Project Allocation | 733,000 | |||||
20(Base Project Allocation - $733,000) |
| |||||
21(ii) Lancaster County Redevelopment Authority |
| |||||
22(A) Acquisition, construction, |
| |||||
28Project Allocation | 3,000,000 | |||||
29(Base Project Allocation - $3,000,000) |
| |||||
30(i) <-(iii) Strasburg Railroad |
| |||||
1(A) Land acquisition, engineering, rail, |
| |||||
6Project Allocation | 4,000,000 | |||||
7(Base Project Allocation - $4,000,000) |
| |||||
<-8(iv) Urban Outfitters, Inc. |
| |||||
9(A) Rehabilitation, construction and |
| |||||
23Project Allocation | 10,000,000 | |||||
| ||||||
26(12) Lycoming County |
| |||||
27(i) Jersey Shore Railroad |
| |||||
28(A) Rehabilitation of existing yard rail
1within the yard, including |
| |||||
4Project Allocation | 3,500,000 | |||||
5(Base Project Allocation - $3,500,000) |
| |||||
6(ii) Williamsport City |
| |||||
7(A) Track rehabilitation, new |
| |||||
11Project Allocation | 350,000 | |||||
12(Base Project Allocation - $350,000) |
| |||||
13(13) McKean County |
| |||||
14(i) American Refining Group |
| |||||
15(A) Reconstruct loading areas and |
| |||||
25Project Allocation | 4,000,000 | |||||
26(Base Project Allocation - $4,000,000) |
| |||||
27(ii) McKean County Economic Development |
| |||||
28(A) Acquisition, construction,
1infrastructure development and |
| |||||
4Project Allocation | 10,000,000 | |||||
| ||||||
7(14) Mifflin County |
| |||||
| ||||||
10(A) Infrastructure, rehabilitation, |
| |||||
16Project Allocation | 2,000,000 | |||||
17(Base Project Allocation - $2,000,000) |
| |||||
18(15) Monroe County |
| |||||
| ||||||
21(A) Purchase and install ties, ballast, |
| |||||
26Project Allocation | 2,500,000 | |||||
27(Base Project Allocation - $2,500,000) |
| |||||
28(16) Montgomery County |
| |||||
29(i) Montgomery County |
| |||||
30(A) Construction, infrastructure
1improvements and other costs related |
| |||||
5Project Allocation | 10,000,000 | |||||
| ||||||
<-8(ii) Colebrookdale Railroad |
| |||||
9(A) Rehabilitation of railroad, including |
| |||||
18Project Allocation | 10,000,000 | |||||
| ||||||
21(17) Schuylkill County |
| |||||
| ||||||
24(A) Infrastructure, rehabilitation and |
| |||||
28Project Allocation | 140,000 | |||||
29(Base Project Allocation - $140,000) |
| |||||
<-30(17.1) Somerset County |
| |||||
1(i) Somerset County |
| |||||
2(A) Construction, infrastructure and |
| |||||
6Project Allocation | 2,000,000 | |||||
7(Base Project Allocation - $2,000,000) |
| |||||
8(B) Acquisition, construction, |
| |||||
12Project Allocation | 2,100,000 | |||||
13(Base Project Allocation - $2,100,000) |
| |||||
14(18) Washington County |
| |||||
15(i) Washington County |
| |||||
16(A) Acquisition, construction, |
| |||||
21Project Allocation | 10,000,000 | |||||
| ||||||
24(B) Acquisition, construction, |
| |||||
29Project Allocation | 10,000,000 | |||||
30(Base Project Allocation -
1$10,000,000) |
| |||||
2(C) Acquisition, construction, |
| |||||
6Project Allocation | 2,000,000 | |||||
7(Base Project Allocation - $2,000,000) |
| |||||
8(D) Acquisition, construction, |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $5,000,000) |
| |||||
15(E) Acquisition, construction, |
| |||||
20Project Allocation | 3,000,000 | |||||
21(Base Project Allocation - $3,000,000) |
| |||||
22(F) Acquisition, construction, |
| |||||
27Project Allocation | 5,000,000 | |||||
28(Base Project Allocation - $5,000,000) |
| |||||
29(G) Acquisition, construction,
1other costs related to Mon Valley |
| |||||
4Project Allocation | 5,000,000 | |||||
5(Base Project Allocation - $5,000,000) |
| |||||
6(H) Acquisition, construction, |
| |||||
12Project Allocation | 10,000,000 | |||||
| ||||||
15(I) Acquisition, construction, |
| |||||
19Project Allocation | 5,000,000 | |||||
20(Base Project Allocation - $5,000,000) |
| |||||
<-21(J) Acquisition, construction, |
| |||||
25Project Allocation | 4,750,000 | |||||
26(Base Project Allocation - $4,750,000) |
| |||||
27(19) Westmoreland County |
| |||||
28(i) Three Rivers Marine and Rail Terminal LP |
| |||||
29(A) Infrastructure, rehabilitation,
1for rail track expansion, including |
| |||||
3Project Allocation | 750,000 | |||||
4(Base Project Allocation - $750,000) |
| |||||
5(ii) Westmoreland County Industrial |
| |||||
7(A) Infrastructure, construction and |
| |||||
11Project Allocation | 1,000,000 | |||||
12(Base Project Allocation - $1,000,000) |
| |||||
13(B) Infrastructure, construction and |
| |||||
18Project Allocation | 350,000 | |||||
19(Base Project Allocation - $350,000) |
| |||||
<-20(iii) Westmoreland County |
| |||||
21(A) Construction, infrastructure and |
| |||||
24Project Allocation | 750,000 | |||||
25(Base Project Allocation - $750,000) |
| |||||
26(20) Wyoming County |
| |||||
27(i) Procter and Gamble Paper Products Co., |
| |||||
29(A) Rehabilitate rail and existing
1signals, ties, ballast, rail, timbers, |
| |||||
3Project Allocation | 250,000 | |||||
4(Base Project Allocation - $250,000) |
| |||||
5(21) Multiple Counties |
| |||||
6(i) D & I Silica, LLC |
| |||||
7(A) Improve and expand existing transload |
| |||||
16Project Allocation | 5,500,000 | |||||
17(Base Project Allocation - $5,500,000) |
| |||||
18(B) Establish new intermodal facilities |
| |||||
1Project Allocation | 10,000,000 | |||||
| ||||||
4(ii) SEDA-COG Joint Rail Authority |
| |||||
5(A) Railroad bridge upgrades, including |
| |||||
10Project Allocation | 2,100,000 | |||||
11(Base Project Allocation - $2,100,000) |
| |||||
12(B) Nittany & Bald Eagle Railroad yard |
| |||||
16Project Allocation | 2,800,000 | |||||
17(Base Project Allocation - $2,800,000) |
| |||||
18(C) Shamokin City and yard |
| |||||
22Project Allocation | 3,150,000 | |||||
23(Base Project Allocation - $3,150,000) |
| |||||
24(D) Lycoming Valley Railroad track |
| |||||
29Project Allocation | 1,260,000 | |||||
30(Base Project Allocation - $1,260,000) |
| |||||
1(E) Capital upgrades and other safety |
| |||||
9Project Allocation | 3,500,000 | |||||
10(Base Project Allocation - $3,500,000) |
| |||||
11(iii) North Shore Railroad |
| |||||
12(A) Retrofitting of diesel locomotives |
| |||||
17Project Allocation | 750,000 | |||||
18(Base Project Allocation - $750,000) |
| |||||
19(B) Rehabilitation, infrastructure, |
| |||||
27Project Allocation | 1,250,000 | |||||
28(Base Project Allocation - $1,250,000) |
| |||||
29(iv) R. J. Corman Railroad Company |
| |||||
30(A) Rehabilitation of the rail line known
1as the Clearfield Cluster, located in |
| |||||
8Project Allocation | 20,000,000 | |||||
| ||||||
11(v) Southwest Pennsylvania Railroad |
| |||||
12(A) Rehabilitate and build railroad |
| |||||
22Project Allocation | 11,500,000 | |||||
| ||||||
<-25(vi) Colebrookdale Railroad |
| |||||
26(A) Rehabilitation of historic Civil War
1construction and related work, to |
| |||||
6Project Allocation | 4,000,000 | |||||
7(Base Project Allocation - $4,000,000) |
| |||||
8(vii) <-(vi) Lycoming and Union Counties |
| |||||
9(A) Construction, rehabilitation, |
| |||||
15Project Allocation | 7,000,000 | |||||
16(Base Project Allocation - $7,000,000) |
|
17(c) Air transportation.--Additional capital projects in the
18category of transportation assistance projects for air
19transportation service to which an interest is to be acquired by
20the Department of Transportation, its successors or assigns and
21to be financed by the incurring of debt are hereby itemized,
22together with their respective estimated financial costs, as
23follows:
25Project | Total Project Allocation | |||||
26(1) Allegheny County |
| |||||
27(i) Allegheny County Airport Authority |
| |||||
28(A) Acquisition, construction,
1commercial site development and |
| |||||
4Project Allocation | 20,000,000 | |||||
| ||||||
7(B) Construction, infrastructure |
| |||||
12Project Allocation | 12,500,000 | |||||
| ||||||
15(C) Construction, infrastructure |
| |||||
19Project Allocation | 15,000,000 | |||||
| ||||||
22(D) Construction, infrastructure |
| |||||
27Project Allocation | 7,000,000 | |||||
28(Base Project Allocation - $7,000,000) |
| |||||
29(E) Construction, infrastructure |
| |||||
3Project Allocation | 10,000,000 | |||||
| ||||||
6(F) Acquisition, construction, |
| |||||
11Project Allocation | 50,000,000 | |||||
| ||||||
14(2) Armstrong County |
| |||||
15(i) McVille Airport |
| |||||
16(A) Acquisition, infrastructure, |
| |||||
21Project Allocation | 1,500,000 | |||||
22(Base Project Allocation - $1,500,000) |
| |||||
<-23(2.1) Beaver County |
| |||||
24(i) Beaver County Airport Authority |
| |||||
25(A) Construction and other related costs |
| |||||
28Project Allocation | 300,000 | |||||
29(Base Project Allocation - $300,000) |
| |||||
30(2.2) Bedford County |
| |||||
1(i) Bedford County Airport Authority |
| |||||
2(A) Construction and other related costs |
| |||||
4Project Allocation | 1,000,000 | |||||
5(Base Project Allocation - $1,000,000) |
| |||||
6(2.3) Bradford County |
| |||||
7(i) Bradford County Airport Authority |
| |||||
8(A) Construction and other related costs |
| |||||
11Project Allocation | 4,227,000 | |||||
12(Base Project Allocation - $4,227,000) |
| |||||
13(3) Bucks County |
| |||||
14(i) Bucks County Airport Authority |
| |||||
15(A) Infrastructure, construction and |
| |||||
21Project Allocation | 150,000 | |||||
22(Base Project Allocation - $150,000) |
| |||||
23(B) Infrastructure, construction and |
| |||||
1Project Allocation | 1,500,000 | |||||
2(Base Project Allocation - $1,500,000) |
| |||||
3(4) Carbon County |
| |||||
4(i) Carbon County Airport Authority |
| |||||
5(A) Construction of airport buildings, |
| |||||
9Project Allocation | 4,500,000 | |||||
10(Base Project Allocation - $4,500,000) |
| |||||
11(5) Chester County |
| |||||
12(i) Chester County Area Airport Authority |
| |||||
13(A) Infrastructure, construction and |
| |||||
16Project Allocation | 337,000 | |||||
17(Base Project Allocation - $337,000) |
| |||||
18(6) Crawford County |
| |||||
| ||||||
21(A) Design, engineer and other related |
| |||||
24Project Allocation | 1,500,000 | |||||
25(Base Project Allocation - $1,500,000) |
| |||||
26(B) Design, engineer, and other related |
| |||||
29Project Allocation | 1,000,000 | |||||
30(Base Project Allocation - $1,000,000) |
| |||||
1(ii) Titusville Airport Authority |
| |||||
2(A) Runway expansion |
| |||||
3Project Allocation | 1,000,000 | |||||
4(Base Project Allocation - $1,000,000) |
| |||||
5(7) Lancaster County |
| |||||
6(i) Lancaster Airport Authority |
| |||||
7(A) Site development to include sewer |
| |||||
10Project Allocation | 750,000 | |||||
11(Base Project Allocation - $750,000) |
| |||||
<-12(8) Luzerne County |
| |||||
13(i) Hazleton Airport |
| |||||
14(A) Acquisition, construction, |
| |||||
18Project Allocation | 300,000 | |||||
19(Base Project Allocation - $300,000) |
| |||||
<-20(8) (9) Lycoming County |
| |||||
21(i) Williamsport Regional Airport |
| |||||
22(A) Design and construction of facility |
| |||||
26Project Allocation | 3,676,000 | |||||
27(Base Project Allocation - $3,676,000) |
| |||||
28(B) Demolition of existing terminal |
| |||||
3Project Allocation | 11,500,000 | |||||
| ||||||
<-6(9) (10) Somerset County |
| |||||
7(i) Somerset County Airport |
| |||||
8(A) Replacement of existing underground |
| |||||
11Project Allocation | 400,000 | |||||
12(Base Project Allocation - $400,000) |
| |||||
13(B) Construction of permanent location |
| |||||
15Project Allocation | 400,000 | |||||
16(Base Project Allocation - $400,000) |
| |||||
17(C) Construction of new hangars, |
| |||||
20Project Allocation | 500,000 | |||||
21(Base Project Allocation - $500,000) |
| |||||
<-22(10) (11) Snyder County |
| |||||
23(i) Penn Valley Airport Authority |
| |||||
24(A) Acquisition, infrastructure and other |
| |||||
27Project Allocation | 750,000 | |||||
28(Base Project Allocation - $750,000) |
| |||||
29(B) Infrastructure, construction and |
| |||||
3Project Allocation | 850,000 | |||||
4(Base Project Allocation - $850,000) |
| |||||
<-5(11) (12) Washington County |
| |||||
6(i) Washington County Airport |
| |||||
7(A) Acquisition, construction, |
| |||||
13Project Allocation | 10,000,000 | |||||
| ||||||
16(ii) Skypointe Business Park |
| |||||
17(A) Acquisition, construction, |
| |||||
21Project Allocation | 5,000,000 | |||||
22(Base Project Allocation - $5,000,000) |
|
23Section 6. Itemization of redevelopment assistance projects.
24(a) Additional capital projects in the category of
25redevelopment assistance projects for capital grants by the
26Department of Community and Economic Development, its successors
27or assigns, authorized under the provisions of the act of May
2820, 1949 (P.L.1633, No.493), known as the Housing and
29Redevelopment Assistance Law, and redevelopment assistance
30capital projects and to be financed by the incurring of debt,
1are hereby itemized, together with their estimated financial
2costs, as follows:
4Project | Total Project Allocation | |||||
5(1) Adams County |
| |||||
6(i) County projects |
| |||||
7(A) Design, infrastructure, construction |
| |||||
11Project Allocation | 5,000,000 | |||||
12(Base Project Allocation - $5,000,000) |
| |||||
| ||||||
15(A) Costs related to site preparations |
| |||||
18Project Allocation | 500,000 | |||||
19(Base Project Allocation - $500,000) |
| |||||
| ||||||
22(A) Acquisition, construction and other |
| |||||
26Project Allocation | 1,000,000 | |||||
27(Base Project Allocation - $1,000,000) |
| |||||
28(B) Rehabilitation, construction and
1located in Cumberland Township |
| |||||
2Project Allocation | 1,000,000 | |||||
3(Base Project Allocation - $1,000,000) |
| |||||
4(C) Construction, infrastructure, |
| |||||
8Project Allocation | 5,000,000 | |||||
9(Base Project Allocation - $5,000,000) |
| |||||
10(2) Allegheny County |
| |||||
11(i) County projects |
| |||||
12(A) Design, acquisition, infrastructure, |
| |||||
17Project Allocation | 2,500,000 | |||||
18(Base Project Allocation - $2,500,000) |
| |||||
19(B) Acquisition, construction, |
| |||||
24Project Allocation | 50,000,000 | |||||
| ||||||
27(C) Infrastructure, site development and |
| |||||
30Project Allocation | 2,000,000 | |||||
1(Base Project Allocation - $2,000,000) |
| |||||
2(D) Acquisition, construction, |
| |||||
7Project Allocation | 5,500,000 | |||||
8(Base Project Allocation - $5,500,000) |
| |||||
9(E) Site development, infrastructure, |
| |||||
12Project Allocation | 10,000,000 | |||||
| ||||||
15(ii) City of Clairton |
| |||||
16(A) Acquisition, construction, |
| |||||
19Project Allocation | 1,500,000 | |||||
20(Base Project Allocation - $1,500,000) |
| |||||
<-21(B) Acquisition, construction, |
| |||||
<-27Project Allocation | 7,500,000 | |||||
28(Base Project Allocation - $7,500,000) |
| |||||
<-29Project Allocation | 750,000 | |||||
30(Base Project Allocation - $750,000) |
| |||||
1(ii.1) City of McKeesport |
| |||||
2(A) Acquisition, construction, |
| |||||
8Project Allocation | 500,000 | |||||
9(Base Project Allocation - $500,000) |
| |||||
10(iii) City of Pittsburgh |
| |||||
11(A) Construction, infrastructure |
| |||||
15Project Allocation | 1,500,000 | |||||
16(Base Project Allocation - $1,500,000) |
| |||||
17(B) Construction, infrastructure |
| |||||
21Project Allocation | 20,000,000 | |||||
| ||||||
24(C) Construction, infrastructure |
| |||||
29Project Allocation | 3,450,000 | |||||
30(Base Project Allocation - $3,450,000) |
| |||||
1(D) Construction, infrastructure |
| |||||
5Project Allocation | 15,000,000 | |||||
| ||||||
8(E) Acquisition, construction, |
| |||||
11Project Allocation | 5,000,000 | |||||
12(Base Project Allocation - $5,000,000) |
| |||||
13(F) Acquisition, construction, |
| |||||
17Project Allocation | 14,000,000 | |||||
| ||||||
20(G) Acquisition, construction, |
| |||||
24Project Allocation | 10,000,000 | |||||
| ||||||
27(H) Acquisition, construction, |
| |||||
30Project Allocation | 1,000,000 | |||||
1(Base Project Allocation - $1,000,000) |
| |||||
2(I) Acquisition, construction, |
| |||||
6Project Allocation | 5,000,000 | |||||
7(Base Project Allocation - $5,000,000) |
| |||||
8(J) Acquisition, construction, |
| |||||
12Project Allocation | 2,000,000 | |||||
13(Base Project Allocation - $2,000,000) |
| |||||
14(K) Construction, infrastructure |
| |||||
17Project Allocation | 1,000,000 | |||||
18(Base Project Allocation - $1,000,000) |
| |||||
19(L) Acquisition, construction, |
| |||||
23Project Allocation | 6,000,000 | |||||
24(Base Project Allocation - $6,000,000) |
| |||||
25(M) Acquisition, construction, |
| |||||
28Project Allocation | 15,000,000 | |||||
| ||||||
1(N) Acquisition, construction, |
| |||||
4Project Allocation | 4,000,000 | |||||
5(Base Project Allocation - $4,000,000) |
| |||||
6(O) Acquisition, construction, |
| |||||
11Project Allocation | 2,000,000 | |||||
12(Base Project Allocation - $2,000,000) |
| |||||
13(P) Demolition, acquisition, |
| |||||
17Project Allocation | 5,500,000 | |||||
18(Base Project Allocation - $5,500,000) |
| |||||
19(Q) Acquisition, construction, |
| |||||
23Project Allocation | 14,000,000 | |||||
| ||||||
26(R) Acquisition, construction, |
| |||||
30Project Allocation | 2,000,000 | |||||
1(Base Project Allocation - $2,000,000) |
| |||||
2(S) Acquisition, construction, |
| |||||
6Project Allocation | 200,000,000 | |||||
| ||||||
9(T) Acquisition, construction, |
| |||||
13Project Allocation | 20,000,000 | |||||
| ||||||
16(U) Acquisition, construction, |
| |||||
19Project Allocation | 1,500,000 | |||||
20(Base Project Allocation - $1,500,000) |
| |||||
21(V) Acquisition, construction, |
| |||||
<-25Project Allocation | 10,000,000 | |||||
| ||||||
<-28Project Allocation | 20,000,000 | |||||
| ||||||
1(W) Acquisition, construction, |
| |||||
5Project Allocation | 6,000,000 | |||||
6(Base Project Allocation - $6,000,000) |
| |||||
7(X) Acquisition, construction, |
| |||||
12Project Allocation | 6,000,000 | |||||
13(Base Project Allocation - $6,000,000) |
| |||||
14(Y) Construction, infrastructure and |
| |||||
18Project Allocation | 10,000,000 | |||||
| ||||||
21(Z) Construction, infrastructure and |
| |||||
25Project Allocation | 8,000,000 | |||||
26(Base Project Allocation - $8,000,000) |
| |||||
27(AA) Acquisition, construction, |
| |||||
1Project Allocation | 7,000,000 | |||||
2(Base Project Allocation - $7,000,000) |
| |||||
3(BB) Acquisition, construction, |
| |||||
7Project Allocation | 10,000,000 | |||||
| ||||||
10(CC) Construction, infrastructure and |
| |||||
14Project Allocation | 20,000,000 | |||||
| ||||||
17(DD) Acquisition, construction, |
| |||||
21Project Allocation | 10,000,000 | |||||
| ||||||
24(EE) Demolition, acquisition, |
| |||||
29Project Allocation | 10,000,000 | |||||
30(Base Project Allocation -
1$10,000,000) |
| |||||
2(FF) Construction, infrastructure and |
| |||||
5Project Allocation | 2,000,000 | |||||
6(Base Project Allocation - $2,000,000) |
| |||||
7(GG) Construction, infrastructure and |
| |||||
10Project Allocation | 20,000,000 | |||||
| ||||||
13(HH) Construction, infrastructure and |
| |||||
16Project Allocation | 4,000,000 | |||||
17(Base Project Allocation - $4,000,000) |
| |||||
18(II) Acquisition, construction, |
| |||||
24Project Allocation | 18,000,000 | |||||
| ||||||
27(JJ) Construction, infrastructure and |
| |||||
30Project Allocation | 10,000,000 | |||||
| ||||||
3(KK) Demolition, construction, |
| |||||
7Project Allocation | 5,000,000 | |||||
8(Base Project Allocation - $5,000,000) |
| |||||
9(LL) Construction, infrastructure and |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $5,000,000) |
| |||||
15(MM) Renovations, infrastructure, |
| |||||
19Project Allocation | 1,000,000 | |||||
20(Base Project Allocation - $1,000,000) |
| |||||
21(NN) Acquisition, remediation, |
| |||||
27Project Allocation | 5,000,000 | |||||
28(Base Project Allocation - $5,000,000) |
| |||||
29(OO) Acquisition, site preparation of
1infrastructure within the |
| |||||
4Project Allocation | 15,000,000 | |||||
| ||||||
7(PP) Acquisition, remediation, |
| |||||
11Project Allocation | 20,000,000 | |||||
| ||||||
14(QQ) Acquisition, construction, |
| |||||
18Project Allocation | 5,500,000 | |||||
19(Base Project Allocation - $5,500,000) |
| |||||
20(RR) Acquisition, remediation, |
| |||||
24Project Allocation | 15,000,000 | |||||
| ||||||
27(SS) Construction, infrastructure and |
| |||||
1Project Allocation | 1,000,000 | |||||
2(Base Project Allocation - $1,000,000) |
| |||||
3(TT) Acquisition, infrastructure |
| |||||
10Project Allocation | 10,000,000 | |||||
| ||||||
13(UU) Construction, renovations, |
| |||||
18Project Allocation | 1,000,000 | |||||
19(Base Project Allocation - $1,000,000) |
| |||||
20(VV) Construction, renovations, |
| |||||
26Project Allocation | 2,000,000 | |||||
27(Base Project Allocation - $2,000,000) |
| |||||
28(WW) Acquisition, construction, |
| |||||
3Project Allocation | 20,000,000 | |||||
| ||||||
6(XX) Acquisition, construction and |
| |||||
10Project Allocation | 17,000,000 | |||||
| ||||||
13(YY) Construction, infrastructure site |
| |||||
17Project Allocation | 5,000,000 | |||||
18(Base Project Allocation - $5,000,000) |
| |||||
<-19(ZZ) Purchase, renovation and other |
| |||||
24Project Allocation | 50,000,000 | |||||
| ||||||
<-27(ZZ) Construction and other related costs |
| |||||
30Project Allocation | 50,000,000 | |||||
| ||||||
3(AAA) Acquisition, construction, |
| |||||
6Project Allocation | 3,000,000 | |||||
7(Base Project Allocation - $3,000,000) |
| |||||
8(BBB) Acquisition, construction, |
| |||||
13Project Allocation | 6,500,000 | |||||
14(Base Project Allocation - $6,500,000) |
| |||||
15(CCC) Construction, infrastructure, |
| |||||
18Project Allocation | 2,500,000 | |||||
19(Base Project Allocation - $2,500,000) |
| |||||
20(DDD) Construction, redevelopment, |
| |||||
26Project Allocation | 2,000,000 | |||||
27(Base Project Allocation - $2,000,000) |
| |||||
28(EEE) Acquisition, construction,
1resource center project |
| |||||
2Project Allocation | 6,500,000 | |||||
3(Base Project Allocation - $6,500,000) |
| |||||
4(FFF) Construction, redevelopment and |
| |||||
8Project Allocation | 1,625,000 | |||||
9(Base Project Allocation - $1,625,000) |
| |||||
10(GGG) Construction, infrastructure, |
| |||||
14Project Allocation | 7,500,000 | |||||
15(Base Project Allocation - $7,500,000) |
| |||||
16(HHH) Construction, infrastructure, |
| |||||
20Project Allocation | 7,500,000 | |||||
21(Base Project Allocation - $7,500,000) |
| |||||
22(III) Acquisition, construction and other |
| |||||
26Project Allocation | 4,000,000 | |||||
27(Base Project Allocation - $4,000,000) |
| |||||
28(JJJ) Acquisition, construction, |
| |||||
1Project Allocation | 1,500,000 | |||||
2(Base Project Allocation - $1,500,000) |
| |||||
3(KKK) Acquisition, construction, |
| |||||
7Project Allocation | 50,000,000 | |||||
| ||||||
10(LLL) Construction, redevelopment and |
| |||||
13Project Allocation | 1,750,000 | |||||
14(Base Project Allocation - $1,750,000) |
| |||||
15(MMM) Acquisition, construction, |
| |||||
19Project Allocation | 2,000,000 | |||||
20(Base Project Allocation - $2,000,000) |
| |||||
21(NNN) Acquisition, construction, |
| |||||
25Project Allocation | 8,000,000 | |||||
26(Base Project Allocation - $8,000,000) |
| |||||
27(OOO) Acquisition, construction,
1of Murray Avenue and Forward Avenue |
| |||||
2Project Allocation | 4,500,000 | |||||
3(Base Project Allocation - $4,500,000) |
| |||||
4(PPP) Acquisition, construction, |
| |||||
8Project Allocation | 5,000,000 | |||||
9(Base Project Allocation - $5,000,000) |
| |||||
<-10(QQQ) Acquisition, construction, |
| |||||
14Project Allocation | 20,000,000 | |||||
| ||||||
17(RRR) Acquisition, construction, |
| |||||
23Project Allocation | 20,000,000 | |||||
| ||||||
26(SSS) Acquisition, construction,
1expansion of parking structure |
| |||||
2Project Allocation | 10,000,000 | |||||
| ||||||
5(TTT) Acquisition, clearing, demolition, |
| |||||
14Project Allocation | 5,000,000 | |||||
15(Base Project Allocation - $5,000,000) |
| |||||
16(UUU) Acquisition, clearing, demolition, |
| |||||
26Project Allocation | 5,000,000 | |||||
27(Base Project Allocation - $5,000,000) |
| |||||
28(VVV) Acquisition, construction,
1related costs for Forbes Hotel project |
| |||||
2Project Allocation | 10,000,000 | |||||
| ||||||
| ||||||
7(A) Acquisition, construction, |
| |||||
13Project Allocation | 8,533,000 | |||||
14(Base Project Allocation - $8,533,000) |
| |||||
15(B) Construction, infrastructure, |
| |||||
19Project Allocation | 10,000,000 | |||||
| ||||||
22(iii.2) Allegheny County Housing Authority |
| |||||
23(A) Acquisition, infrastructure, |
| |||||
27Project Allocation | 750,000 | |||||
28(Base Project Allocation - $750,000) |
| |||||
| ||||||
1(A) Acquisition, redevelopment and |
| |||||
6Project Allocation | 10,000,000 | |||||
| ||||||
<-9(iv.1) Aspinwall Borough |
| |||||
10(A) Construction, infrastructure, |
| |||||
13Project Allocation | 1,543,000 | |||||
14(Base Project Allocation - $1,543,000) |
| |||||
15(iv.2) Bethel Park Municipality |
| |||||
16(A) Construction, infrastructure, |
| |||||
20Project Allocation | 500,000 | |||||
21(Base Project Allocation - $500,000) |
| |||||
22(B) Construction, acquisition, abatement |
| |||||
26Project Allocation | 500,000 | |||||
27(Base Project Allocation - $500,000) |
| |||||
28(iv.3) Brentwood Borough |
| |||||
29(A) Construction, redevelopment and other
1Public Safety Center |
| |||||
2Project Allocation | 3,000,000 | |||||
3(Base Project Allocation - $3,000,000) |
| |||||
4(B) Construction, redevelopment and other |
| |||||
7Project Allocation | 1,000,000 | |||||
8(Base Project Allocation - $1,000,000) |
| |||||
9(v) Bridgeville Borough |
| |||||
10(A) Construction, infrastructure and |
| |||||
14Project Allocation | 2,000,000 | |||||
15(Base Project Allocation - $2,000,000) |
| |||||
<-16(v.1) Castle Shannon Borough |
| |||||
17(A) Construction, acquisition, |
| |||||
21Project Allocation | 12,000,000 | |||||
| ||||||
24(v.2) Crafton Borough |
| |||||
25(A) Construction, infrastructure, |
| |||||
29Project Allocation | 1,205,000 | |||||
30(Base Project Allocation - $1,205,000) |
| |||||
1(v.1) <-(v.3) Edgewood Borough |
| |||||
2(A) Construction, infrastructure |
| |||||
6Project Allocation | 3,000,000 | |||||
7(Base Project Allocation - $3,000,000) |
| |||||
<-8(v.4) Etna Borough |
| |||||
9(A) Construction and other related costs |
| |||||
11Project Allocation | 1,000,000 | |||||
12(Base Project Allocation - $1,000,000) |
| |||||
13(vi) Findlay Township |
| |||||
14(A) Construction, infrastructure |
| |||||
19Project Allocation | 12,500,000 | |||||
| ||||||
22(B) Construction, infrastructure |
| |||||
26Project Allocation | 15,000,000 | |||||
| ||||||
<-29(C) Construction, acquisition,
1for development project |
| |||||
2Project Allocation | 20,000,000 | |||||
| ||||||
5(vi.1) Glenshaw |
| |||||
6(A) Construction, acquisition, |
| |||||
9Project Allocation | 20,000,000 | |||||
| ||||||
12(vi.2) Greentree Borough |
| |||||
13(A) Acquisition, construction, |
| |||||
17Project Allocation | 10,000,000 | |||||
| ||||||
20(vi.3) Harmar Township |
| |||||
21(A) Construction, infrastructure, |
| |||||
25Project Allocation | 10,000,000 | |||||
| ||||||
28(vii) McKees Rocks Borough |
| |||||
29(A) Construction, infrastructure and |
| |||||
3Project Allocation | 2,000,000 | |||||
4(Base Project Allocation - $2,000,000) |
| |||||
5(B) Construction, acquisition, |
| |||||
11Project Allocation | 10,000,000 | |||||
| ||||||
<-14(vii.1) Millvale Borough |
| |||||
15(A) Acquisition, infrastructure, |
| |||||
20Project Allocation | 1,000,000 | |||||
21(Base Project Allocation - $1,000,000) |
| |||||
22(viii) Moon Township |
| |||||
23(A) Construction, infrastructure |
| |||||
28Project Allocation | 7,000,000 | |||||
29(Base Project Allocation - $7,000,000) |
| |||||
30(B) Construction, infrastructure
1improvements and other costs related |
| |||||
4Project Allocation | 10,000,000 | |||||
| ||||||
7(C) Acquisition, construction, site work |
| |||||
10Project Allocation | 10,000,000 | |||||
| ||||||
13(D) Acquisition, construction, |
| |||||
18Project Allocation | 15,000,000 | |||||
| ||||||
<-21(E) Construction, acquisition, |
| |||||
25Project Allocation | 5,000,000 | |||||
26(Base Project Allocation - $5,000,000) |
| |||||
27(F) Construction, acquisition, |
| |||||
1Project Allocation | 25,000,000 | |||||
| ||||||
4(ix) Mt. Oliver Borough |
| |||||
5(A) Acquisition, construction, |
| |||||
9Project Allocation | 2,500,000 | |||||
10(Base Project Allocation - $2,500,000) |
| |||||
<-11(ix.1) North Versailles Township |
| |||||
12(A) Acquisition, construction, |
| |||||
16Project Allocation | 20,000,000 | |||||
| ||||||
<-19(ix.1) (ix.2) Oakmont Borough |
| |||||
20(A) Construction, rehabilitation and |
| |||||
23Project Allocation | 2,950,000 | |||||
24(Base Project Allocation - $2,950,000) |
| |||||
25(B) Construction, redevelopment, |
| |||||
30Project Allocation | 1,000,000 | |||||
1(Base Project Allocation - $1,000,000) |
| |||||
<-2(ix.2) (ix.3) Penn Hills Township |
| |||||
3(A) Acquisition, construction and other |
| |||||
6Project Allocation | 600,000 | |||||
7(Base Project Allocation - $600,000) |
| |||||
8(x) Plum Borough |
| |||||
9(A) Construction, infrastructure |
| |||||
12Project Allocation | 3,500,000 | |||||
13(Base Project Allocation - $3,500,000) |
| |||||
14(xi) Robinson Township |
| |||||
15(A) Construction, infrastructure and |
| |||||
18Project Allocation | 500,000 | |||||
19(Base Project Allocation - $500,000) |
| |||||
20(B) Acquisition, construction, |
| |||||
24Project Allocation | 10,000,000 | |||||
| ||||||
<-27(C) Acquisition, construction, |
| |||||
1Project Allocation | 2,000,000 | |||||
2(Base Project Allocation - $2,000,000) |
| |||||
3(D) Construction, acquisition, |
| |||||
8Project Allocation | 2,000,000 | |||||
9(Base Project Allocation - $2,000,000) |
| |||||
10(xii) Ross Township |
| |||||
11(A) Acquisition, demolition, |
| |||||
15Project Allocation | 2,250,000 | |||||
16(Base Project Allocation - $2,250,000) |
| |||||
17(B) Acquisition, demolition, |
| |||||
22Project Allocation | 2,250,000 | |||||
23(Base Project Allocation - $2,250,000) |
| |||||
24(C) Acquisition, demolition, |
| |||||
28Project Allocation | 4,000,000 | |||||
29(Base Project Allocation - $4,000,000) |
| |||||
<-30(D) Acquisition, construction,
1infrastructure, redevelopment, |
| |||||
5Project Allocation | 10,000,000 | |||||
| ||||||
8(xiii) Sewickley Borough |
| |||||
9(A) Construction, infrastructure and |
| |||||
13Project Allocation | 1,000,000 | |||||
14(Base Project Allocation - $1,000,000) |
| |||||
15(B) Construction, infrastructure and |
| |||||
20Project Allocation | 1,000,000 | |||||
21(Base Project Allocation - $1,000,000) |
| |||||
22(C) Construction, infrastructure and |
| |||||
27Project Allocation | 1,000,000 | |||||
28(Base Project Allocation - $1,000,000) |
| |||||
<-29(xiii.1) Sharpsburg Borough |
| |||||
30(A) Infrastructure and other related |
| |||||
3Project Allocation | 1,850,000 | |||||
4(Base Project Allocation - $1,850,000) |
| |||||
5(xiv) West Deer Township |
| |||||
6(A) Infrastructure, rehabilitation, |
| |||||
11Project Allocation | 800,000 | |||||
12(Base Project Allocation - $800,000) |
| |||||
13(xv) West Mifflin Borough |
| |||||
14(A) Acquisition, construction, |
| |||||
20Project Allocation | 20,000,000 | |||||
| ||||||
<-23(B) Acquisition, construction, |
| |||||
27Project Allocation | 10,000,000 | |||||
| ||||||
<-30(xvi) White Oak Borough |
| |||||
1(A) Construction, infrastructure and |
| |||||
4Project Allocation | 1,500,000 | |||||
5(Base Project Allocation - $1,500,000) |
| |||||
6(3) Armstrong County |
| |||||
7(i) County projects |
| |||||
8(A) Infrastructure, construction and |
| |||||
12Project Allocation | 1,500,000 | |||||
13(Base Project Allocation - $1,500,000) |
| |||||
14(B) Acquisition, infrastructure, |
| |||||
19Project Allocation | 5,000,000 | |||||
20(Base Project Allocation - $5,000,000) |
| |||||
21(C) Acquisition, infrastructure, |
| |||||
27Project Allocation | 2,000,000 | |||||
28(Base Project Allocation - $2,000,000) |
| |||||
| ||||||
1(A) Acquisition, infrastructure and |
| |||||
4Project Allocation | 3,000,000 | |||||
5(Base Project Allocation - $3,000,000) |
| |||||
6(4) Beaver County |
| |||||
<-7(i) County projects |
| |||||
8(A) Redevelopment, restoration and other |
| |||||
13Project Allocation | 1,000,000 | |||||
14(Base Project Allocation - $1,000,000) |
| |||||
15(B) Construction, infrastructure and |
| |||||
19Project Allocation | 500,000 | |||||
20(Base Project Allocation - $500,000) |
| |||||
21(ii) City of Aliquippa |
| |||||
22(A) Acquisition, construction, |
| |||||
27Project Allocation | 10,000,000 | |||||
| ||||||
30(i) <-(iii) Beaver County Corporation for
1Economic Development |
| |||||
2(A) Infrastructure, site improvements and |
| |||||
6Project Allocation | 1,000,000 | |||||
7(Base Project Allocation - $1,000,000) |
| |||||
8(B) Acquisition, infrastructure, |
| |||||
13Project Allocation | 15,000,000 | |||||
| ||||||
16(C) Acquisition, infrastructure, |
| |||||
22Project Allocation | 15,000,000 | |||||
| ||||||
| ||||||
27(A) Renovation and rehabilitation of |
| |||||
1Project Allocation | 1,000,000 | |||||
2(Base Project Allocation - $1,000,000) |
| |||||
3(B) Rehabilitation, construction and |
| |||||
7Project Allocation | 1,000,000 | |||||
8(Base Project Allocation - $1,000,000) |
| |||||
9(C) Infrastructure, construction and |
| |||||
14Project Allocation | 975,000 | |||||
15(Base Project Allocation - $975,000) |
| |||||
<-16(v) Baden bOROUGH |
| |||||
17(A) Acquisition, construction, |
| |||||
21Project Allocation | 5,000,000 | |||||
22(Base Project Allocation - $5,000,000) |
| |||||
23(vi) Ellwood City Borough |
| |||||
24(A) Acquisition, construction, |
| |||||
29Project Allocation | 15,000,000 | |||||
30(Base Project Allocation -
1$15,000,000) |
| |||||
2(vii) Harmony Township |
| |||||
3(A) Construction, infrastructure and |
| |||||
6Project Allocation | 1,000,000 | |||||
7(Base Project Allocation - $1,000,000) |
| |||||
<-8(B) Acquisition, construction, |
| |||||
12Project Allocation | 20,000,000 | |||||
| ||||||
15(5) Bedford County |
| |||||
<-16(i) (Reserved) |
| |||||
<-17(i) County projects |
| |||||
18(A) Acquisition, construction, |
| |||||
23Project Allocation | 4,000,000 | |||||
24(Base Project Allocation - $4,000,000) |
| |||||
<-25(ii) Bedford County Development Association |
| |||||
26(A) Preparation of 90 acres of Bedford |
| |||||
30Project Allocation | 2,375,000 | |||||
1(Base Project Allocation - $2,375,000) |
| |||||
2(6) Berks County |
| |||||
3(i) County projects |
| |||||
4(A) Acquisition, infrastructure, |
| |||||
8Project Allocation | 3,500,000 | |||||
9(Base Project Allocation - $3,500,000) |
| |||||
<-10(B) Acquisition, construction, |
| |||||
14Project Allocation | 15,000,000 | |||||
| ||||||
17(C) Rehabilitation of railroad, including |
| |||||
26Project Allocation | 10,000,000 | |||||
| ||||||
29(ii) Amity Township |
| |||||
30(A) Acquisition, infrastructure,
1construction and other related costs |
| |||||
4Project Allocation | 1,300,000 | |||||
5(Base Project Allocation - $1,300,000) |
| |||||
6(iii) Boyertown Borough |
| |||||
7(A) Construction, infrastructure and |
| |||||
11Project Allocation | 4,000,000 | |||||
12(Base Project Allocation - $4,000,000) |
| |||||
13(iv) City of Reading |
| |||||
14(A) Construction, infrastructure and |
| |||||
17Project Allocation | 1,500,000 | |||||
18(Base Project Allocation - $1,500,000) |
| |||||
19(B) Construction, infrastructure and |
| |||||
23Project Allocation | 2,500,000 | |||||
24(Base Project Allocation - $2,500,000) |
| |||||
25(C) Construction, infrastructure and |
| |||||
29Project Allocation | 1,500,000 | |||||
30(Base Project Allocation - $1,500,000) |
| |||||
1(D) Construction, infrastructure and |
| |||||
5Project Allocation | 500,000 | |||||
6(Base Project Allocation - $500,000) |
| |||||
7(E) Renovation, restoration, |
| |||||
11Project Allocation | 1,112,000 | |||||
12(Base Project Allocation - $1,112,000) |
| |||||
13(F) Construction, infrastructure |
| |||||
18Project Allocation | 5,000,000 | |||||
19(Base Project Allocation - $5,000,000) |
| |||||
20(G) Construction, reconstruction, |
| |||||
26Project Allocation | 5,000,000 | |||||
27(Base Project Allocation - $5,000,000) |
| |||||
28(H) Rehabilitation, construction and
1site, including track construction and |
| |||||
10Project Allocation | 5,000,000 | |||||
11(Base Project Allocation - $5,000,000) |
| |||||
12(I) Construction, infrastructure |
| |||||
17Project Allocation | 600,000 | |||||
18(Base Project Allocation - $600,000) |
| |||||
19(J) Construction, infrastructure |
| |||||
24Project Allocation | 1,178,000 | |||||
25(Base Project Allocation - $1,178,000) |
| |||||
<-26(iv.1) Cumru Township |
| |||||
27(A) Acquisition, construction,
1businesses |
| |||||
2Project Allocation | 20,000,000 | |||||
| ||||||
5(v) Exeter Township |
| |||||
6(A) Construction, infrastructure and |
| |||||
9Project Allocation | 5,000,000 | |||||
10(Base Project Allocation - $5,000,000) |
| |||||
11(B) Construction, site preparation, |
| |||||
15Project Allocation | 2,500,000 | |||||
16(Base Project Allocation - $2,500,000) |
| |||||
17(vi) Fleetwood Borough |
| |||||
18(A) Acquisition, infrastructure, |
| |||||
22Project Allocation | 5,000,000 | |||||
23(Base Project Allocation - $5,000,000) |
| |||||
24(B) Acquisition, infrastructure, |
| |||||
28Project Allocation | 2,500,000 | |||||
29(Base Project Allocation - $2,500,000) |
| |||||
30(vi.1) Kutztown Borough |
| |||||
1(A) Revitalization of |
| |||||
6Project Allocation | 5,000,000 | |||||
7(Base Project Allocation - $5,000,000) |
| |||||
<-8(B) Acquisition, demolition, |
| |||||
13Project Allocation | 1,000,000 | |||||
14(Base Project Allocation - $1,000,000) |
| |||||
<-15(vi.2) Leesport Borough |
| |||||
16(A) Construction, renovation and other |
| |||||
18Project Allocation | 1,250,000 | |||||
19(Base Project Allocation - $1,250,000) |
| |||||
<-20(vi.2) (vi.3) Lyons Borough |
| |||||
21(A) Construction, infrastructure, |
| |||||
26Project Allocation | 17,000,000 | |||||
| ||||||
29(vii) Muhlenberg Township |
| |||||
30(A) Acquisition, infrastructure,
1renovations and other related costs |
| |||||
4Project Allocation | 5,000,000 | |||||
5(Base Project Allocation - $5,000,000) |
| |||||
6(B) Acquisition, infrastructure, |
| |||||
10Project Allocation | 10,000,000 | |||||
| ||||||
<-13(viii) Snyder Township |
| |||||
14(A) Renovation and other related costs to |
| |||||
17Project Allocation | 1,650,000 | |||||
18(Base Project Allocation - $1,650,000) |
| |||||
19(ix) Borough of Topton |
| |||||
20(A) Construction, infrastructure and |
| |||||
24Project Allocation | 3,000,000 | |||||
25(Base Project Allocation - $3,000,000) |
| |||||
26(viii) <-(x) West Reading Borough |
| |||||
27(A) Acquisition, infrastructure, |
| |||||
1Project Allocation | 3,500,000 | |||||
2(Base Project Allocation - $3,500,000) |
| |||||
3(7) Blair County |
| |||||
<-4(i) City of Altoona |
| |||||
5(A) Construction, infrastructure and |
| |||||
10Project Allocation | 1,000,000 | |||||
11(Base Project Allocation - $1,000,000) |
| |||||
| ||||||
14(A) Acquisition, abatement of hazardous |
| |||||
17Project Allocation | 2,000,000 | |||||
18(Base Project Allocation - $2,000,000) |
| |||||
19(8) Bradford County |
| |||||
<-20(i) (Reserved) |
| |||||
21(ii) Borough of Towanda |
| |||||
22(A) Acquisition, construction, |
| |||||
25Project Allocation | 5,000,000 | |||||
26(Base Project Allocation - $5,000,000) |
| |||||
27(i) (iii) Wyalusing Township |
| |||||
28(A) Acquisition, site preparation,
1Wyalusing Professional Park |
| |||||
2Project Allocation | 8,000,000 | |||||
3(Base Project Allocation - $8,000,000) |
| |||||
4(9) Bucks County |
| |||||
5(i) County projects |
| |||||
6(A) Acquisition, construction, |
| |||||
10Project Allocation | 1,000,000 | |||||
11(Base Project Allocation - $1,000,000) |
| |||||
12(B) Acquisition, construction, |
| |||||
18Project Allocation | 10,000,000 | |||||
| ||||||
21(C) Acquisition, infrastructure, |
| |||||
26Project Allocation | 5,750,000 | |||||
27(Base Project Allocation - $5,750,000) |
| |||||
28(D) Acquisition, rehabilitation,
1space and development of |
| |||||
4Project Allocation | 4,500,000 | |||||
5(Base Project Allocation - $4,500,000) |
| |||||
| ||||||
8(A) Acquisition, infrastructure, |
| |||||
12Project Allocation | 2,100,000 | |||||
13(Base Project Allocation - $2,100,000) |
| |||||
14(iii) Redevelopment Authority of Bucks County |
| |||||
15(A) Acquisition, infrastructure, |
| |||||
19Project Allocation | 525,000 | |||||
20(Base Project Allocation - $525,000) |
| |||||
21(B) Acquisition, infrastructure, |
| |||||
25Project Allocation | 600,000 | |||||
26(Base Project Allocation - $600,000) |
| |||||
27(C) Acquisition, infrastructure, |
| |||||
1Project Allocation | 780,000 | |||||
2(Base Project Allocation - $780,000) |
| |||||
3(D) Acquisition, infrastructure, |
| |||||
8Project Allocation | 1,100,000 | |||||
9(Base Project Allocation - $1,100,000) |
| |||||
10(E) Acquisition, infrastructure, |
| |||||
14Project Allocation | 1,200,000 | |||||
15(Base Project Allocation - $1,200,000) |
| |||||
16(F) Infrastructure, construction and |
| |||||
21Project Allocation | 1,200,000 | |||||
22(Base Project Allocation - $1,200,000) |
| |||||
23(G) Acquisition, infrastructure, |
| |||||
28Project Allocation | 1,200,000 | |||||
29(Base Project Allocation - $1,200,000) |
| |||||
30(H) Acquisition, demolition,
1infrastructure improvements, |
| |||||
5Project Allocation | 4,000,000 | |||||
6(Base Project Allocation - $4,000,000) |
| |||||
7(I) Infrastructure, construction, |
| |||||
10Project Allocation | 10,000,000 | |||||
| ||||||
13(iv) Bensalem Township |
| |||||
14(A) Acquisition, infrastructure and other |
| |||||
17Project Allocation | 1,500,000 | |||||
18(Base Project Allocation - $1,500,000) |
| |||||
<-19(B) Renovation, rehabilitation and other |
| |||||
22Project Allocation | 500,000 | |||||
23(Base Project Allocation - $500,000) |
| |||||
24(C) Construction and other related costs |
| |||||
27Project Allocation | 5,000,000 | |||||
28(Base Project Allocation - $5,000,000) |
| |||||
29(D) Construction and other related costs
1have completed their treatment program |
| |||||
3Project Allocation | 600,000 | |||||
4(Base Project Allocation - $600,000) |
| |||||
5(E) Construction, infrastructure, |
| |||||
10Project Allocation | 1,000,000 | |||||
11(Base Project Allocation - $1,000,000) |
| |||||
12(F) Acquisition, construction, |
| |||||
17Project Allocation | 2,500,000 | |||||
18(Base Project Allocation - $2,500,000) |
| |||||
19(G) Construction and other related costs |
| |||||
22Project Allocation | 2,000,000 | |||||
23(Base Project Allocation - $2,000,000) |
| |||||
24(H) Construction, infrastructure, |
| |||||
1Project Allocation | 500,000 | |||||
2(Base Project Allocation - $500,000) |
| |||||
3(iv.1) Bristol Township |
| |||||
4(A) Construction, acquisition and other |
| |||||
9Project Allocation | 1,100,000 | |||||
10(Base Project Allocation - $1,100,000) |
| |||||
11(B) Acquisition, construction, |
| |||||
16Project Allocation | 4,000,000 | |||||
17(Base Project Allocation - $4,000,000) |
| |||||
18(iv.2) Bristol Borough |
| |||||
19(A) Construction, infrastructure and |
| |||||
22Project Allocation | 1,000,000 | |||||
23(Base Project Allocation - $1,000,000) |
| |||||
24(v) Chalfont Borough |
| |||||
25(A) Acquisition, construction, |
| |||||
30Project Allocation | 10,000,000 | |||||
| ||||||
<-3(v.1) Doylestown Borough |
| |||||
4(A) Acquisition, construction, |
| |||||
9Project Allocation | 1,415,000 | |||||
10(Base Project Allocation - $1,415,000) |
| |||||
11(B) Construction, reconstruction and |
| |||||
14Project Allocation | 1,100,000 | |||||
15(Base Project Allocation - $1,100,000) |
| |||||
16(vi) Lower Southampton Township |
| |||||
17(A) Infrastructure, construction, |
| |||||
20Project Allocation | 1,000,000 | |||||
21(Base Project Allocation - $1,000,000) |
| |||||
22(B) Acquisition, infrastructure, |
| |||||
25Project Allocation | 2,000,000 | |||||
26(Base Project Allocation - $2,000,000) |
| |||||
<-27(C) Construction, redevelopment, |
| |||||
30Project Allocation | 500,000 | |||||
1(Base Project Allocation - $500,000) |
| |||||
2(D) Construction, infrastructure, |
| |||||
5Project Allocation | 2,000,000 | |||||
6(Base Project Allocation - $2,000,000) |
| |||||
7(E) Construction, infrastructure, |
| |||||
10Project Allocation | 1,000,000 | |||||
11(Base Project Allocation - $1,000,000) |
| |||||
12(vii) Middletown Township |
| |||||
13(A) Infrastructure, construction, |
| |||||
<-17Project Allocation | 600,000 | |||||
18(Base Project Allocation - $600,000) |
| |||||
<-19Project Allocation | 800,000 | |||||
20(Base Project Allocation - $800,000) |
| |||||
21(B) Infrastructure, construction and |
| |||||
24Project Allocation | 1,000,000 | |||||
25(Base Project Allocation - $1,000,000) |
| |||||
26(C) Acquisition, infrastructure, |
| |||||
30Project Allocation | 2,000,000 | |||||
1(Base Project Allocation - $2,000,000) |
| |||||
<-2(D) Construction, renovation, |
| |||||
6Project Allocation | 25,000,000 | |||||
| ||||||
9(E) Construction, acquisition, |
| |||||
13Project Allocation | 2,000,000 | |||||
14(Base Project Allocation - $2,000,000) |
| |||||
15(F) Construction, renovation, |
| |||||
18Project Allocation | 1,000,000 | |||||
19(Base Project Allocation - $1,000,000) |
| |||||
20(vii.1) Milford Township |
| |||||
21(A) Land acquisition, construction, |
| |||||
25Project Allocation | 15,000,000 | |||||
| ||||||
28(viii) Northampton Township |
| |||||
29(A) Acquisition, infrastructure,
1for a new police department |
| |||||
4Project Allocation | 2,500,000 | |||||
5(Base Project Allocation - $2,500,000) |
| |||||
6(ix) Quakertown Borough |
| |||||
7(A) Acquisition, infrastructure, |
| |||||
12Project Allocation | 3,500,000 | |||||
13(Base Project Allocation - $3,500,000) |
| |||||
<-14(ix.1) Upper Southampton Township |
| |||||
15(A) Construction and other related costs |
| |||||
19Project Allocation | 1,250,000 | |||||
20(Base Project Allocation - $1,250,000) |
| |||||
| ||||||
23Project Allocation | 1,000,000 | |||||
24(Base Project Allocation - $1,000,000) |
| |||||
25(x) Warwick Township |
| |||||
26(A) Acquisition, infrastructure, |
| |||||
30Project Allocation | 1,000,000 | |||||
1(Base Project Allocation - $1,000,000) |
| |||||
2(B) Infrastructure, construction, |
| |||||
7Project Allocation | 1,500,000 | |||||
8(Base Project Allocation - $1,500,000) |
| |||||
9(10) Butler County |
| |||||
10(i) Butler County Redevelopment Authority |
| |||||
11(A) Site preparation activity, including |
| |||||
16Project Allocation | 10,000,000 | |||||
| ||||||
19(B) Construction of infrastructure, |
| |||||
24Project Allocation | 10,000,000 | |||||
| ||||||
27(ii) Cranberry Township |
| |||||
28(A) Acquisition, infrastructure,
1other amenities in Route 228 corridor |
| |||||
2Project Allocation | 1,000,000 | |||||
3(Base Project Allocation - $1,000,000) |
| |||||
4(B) Acquisition, infrastructure, |
| |||||
7Project Allocation | 1,000,000 | |||||
8(Base Project Allocation - $1,000,000) |
| |||||
9(C) Acquisition, infrastructure, |
| |||||
14Project Allocation | 1,500,000 | |||||
15(Base Project Allocation - $1,500,000) |
| |||||
16(D) Acquisition, construction, site |
| |||||
21Project Allocation | 2,500,000 | |||||
22(Base Project Allocation - $2,500,000) |
| |||||
23(E) Acquisition, infrastructure, |
| |||||
26Project Allocation | 2,500,000 | |||||
27(Base Project Allocation - $2,500,000) |
| |||||
28(F) Acquisition, rehabilitation, site
1project in Route 228 corridor |
| |||||
2Project Allocation | 4,000,000 | |||||
3(Base Project Allocation - $4,000,000) |
| |||||
4(G) Acquisition, rehabilitation, site |
| |||||
8Project Allocation | 5,000,000 | |||||
9(Base Project Allocation - $5,000,000) |
| |||||
10(H) Acquisition, infrastructure, |
| |||||
14Project Allocation | 5,000,000 | |||||
15(Base Project Allocation - $5,000,000) |
| |||||
16(iii) Zelienople Borough |
| |||||
17(A) Acquisition, infrastructure, |
| |||||
22Project Allocation | 3,900,000 | |||||
23(Base Project Allocation - $3,900,000) |
| |||||
24(11) Cambria County |
| |||||
25(i) County projects |
| |||||
26(A) Acquisition, construction, site |
| |||||
1Project Allocation | 5,000,000 | |||||
2(Base Project Allocation - $5,000,000) |
| |||||
<-3(B) Acquisition, construction, |
| |||||
8Project Allocation | 10,000,000 | |||||
| ||||||
11(C) Acquisition, construction, |
| |||||
14Project Allocation | 5,000,000 | |||||
15(Base Project Allocation - $5,000,000) |
| |||||
16(D) Acquisition, construction, |
| |||||
20Project Allocation | 5,000,000 | |||||
21(Base Project Allocation - $5,000,000) |
| |||||
22(E) Acquisition, construction, |
| |||||
25Project Allocation | 1,000,000 | |||||
26(Base Project Allocation - $1,000,000) |
| |||||
27(F) Acquisition, construction, |
| |||||
1Project Allocation | 5,000,000 | |||||
2(Base Project Allocation - $5,000,000) |
| |||||
3(G) Acquisition, construction, |
| |||||
7Project Allocation | 1,000,000 | |||||
8(Base Project Allocation - $1,000,000) |
| |||||
9(H) Rehabilitation, construction and |
| |||||
12Project Allocation | 10,000,000 | |||||
| ||||||
15(ii) Cambria Township |
| |||||
16(A) Construction, infrastructure and |
| |||||
19Project Allocation | 2,500,000 | |||||
20(Base Project Allocation - $2,500,000) |
| |||||
21(B) Acquisition, construction, |
| |||||
26Project Allocation | 5,000,000 | |||||
27(Base Project Allocation - $5,000,000) |
| |||||
<-28(C) Construction, infrastructure and |
| |||||
1Project Allocation | 5,000,000 | |||||
2(Base Project Allocation - $5,000,000) |
| |||||
3(iii) City of Johnstown |
| |||||
4(A) Construction, infrastructure and |
| |||||
7Project Allocation | 1,250,000 | |||||
8(Base Project Allocation - $1,250,000) |
| |||||
9(B) Construction, reconstruction, |
| |||||
14Project Allocation | 3,000,000 | |||||
15(Base Project Allocation - $3,000,000) |
| |||||
16(C) Acquisition, construction, |
| |||||
23Project Allocation | 5,000,000 | |||||
24(Base Project Allocation - $5,000,000) |
| |||||
25(D) Demolition and construction of |
| |||||
30Project Allocation | 10,000,000 | |||||
| ||||||
<-3(E) Acquisition, construction, |
| |||||
9Project Allocation | 10,000,000 | |||||
| ||||||
12(F) Acquisition, construction, |
| |||||
17Project Allocation | 5,000,000 | |||||
18(Base Project Allocation - $5,000,000) |
| |||||
19(G) Acquisition, construction, |
| |||||
24Project Allocation | 7,500,000 | |||||
25(Base Project Allocation - $7,500,000) |
| |||||
26(H) Acquisition, construction, |
| |||||
30Project Allocation | 5,000,000 | |||||
1(Base Project Allocation - $5,000,000) |
| |||||
2(I) Construction, infrastructure, |
| |||||
7Project Allocation | 3,000,000 | |||||
8(Base Project Allocation - $3,000,000) |
| |||||
9(J) Construction, infrastructure and |
| |||||
13Project Allocation | 500,000 | |||||
14(Base Project Allocation - $500,000) |
| |||||
15(K) Construction, infrastructure and |
| |||||
18Project Allocation | 500,000 | |||||
19(Base Project Allocation - $500,000) |
| |||||
20(iv) Cresson Township |
| |||||
21(A) Construction, demolition, |
| |||||
25Project Allocation | 20,000,000 | |||||
| ||||||
28(v) Ebensburg Borough |
| |||||
29(A) Construction, infrastructure and
1Courthouse renovation project |
| |||||
2Project Allocation | 500,000 | |||||
3(Base Project Allocation - $500,000) |
| |||||
4(vi) Hastings Borough |
| |||||
5(A) Acquisition, construction, |
| |||||
12Project Allocation | 5,000,000 | |||||
13(Base Project Allocation - $5,000,000) |
| |||||
<-14(B) Acquisition, construction, |
| |||||
18Project Allocation | 5,000,000 | |||||
19(Base Project Allocation - $5,000,000) |
| |||||
20(vii) Loretto Borough |
| |||||
21(A) Construction, infrastructure and |
| |||||
25Project Allocation | 10,000,000 | |||||
| ||||||
<-28(viii) Richland Township |
| |||||
29(A) Acquisition, construction,
1abatement of hazardous materials and |
| |||||
4Project Allocation | 5,000,000 | |||||
5(Base Project Allocation - $5,000,000) |
| |||||
6(12) Cameron County |
| |||||
7(i) County projects |
| |||||
8(A) Acquisition, infrastructure, |
| |||||
11Project Allocation | 10,000,000 | |||||
| ||||||
14(13) Carbon County |
| |||||
15(i) County projects |
| |||||
16(A) Site development, infrastructure, |
| |||||
20Project Allocation | 4,800,000 | |||||
21(Base Project Allocation - $4,800,000) |
| |||||
22(B) Construction, site development, |
| |||||
27Project Allocation | 4,000,000 | |||||
28(Base Project Allocation - $4,000,000) |
| |||||
29(C) Construction, infrastructure and
1Health Systems renovation projects at |
| |||||
4Project Allocation | 1,000,000 | |||||
5(Base Project Allocation - $1,000,000) |
| |||||
6(D) Acquisition, construction, |
| |||||
11Project Allocation | 7,500,000 | |||||
12(Base Project Allocation - $7,500,000) |
| |||||
<-13(ii) Nesquehoning Borough |
| |||||
14(A) Construction, renovation and other |
| |||||
17Project Allocation | 1,500,000 | |||||
18(Base Project Allocation - $1,500,000) |
| |||||
19(14) Centre County |
| |||||
20(i) County projects |
| |||||
21(A) Acquisition, infrastructure, |
| |||||
24Project Allocation | 3,000,000 | |||||
25(Base Project Allocation - $3,000,000) |
| |||||
26(B) Acquisition, infrastructure, |
| |||||
30Project Allocation | 5,000,000 | |||||
1(Base Project Allocation - $5,000,000) |
| |||||
2(C) Acquisition, infrastructure, |
| |||||
7Project Allocation | 8,000,000 | |||||
8(Base Project Allocation - $8,000,000) |
| |||||
9(D) Acquisition, infrastructure, |
| |||||
13Project Allocation | 10,000,000 | |||||
| ||||||
<-16(E) Construction, infrastructure, |
| |||||
20Project Allocation | 5,000,000 | |||||
21(Base Project Allocation - $5,000,000) |
| |||||
22(F) Construction, rehabilitation, site |
| |||||
29Project Allocation | 5,000,000 | |||||
30(Base Project Allocation - $5,000,000) |
| |||||
1(G) Acquisition, construction, |
| |||||
5Project Allocation | 5,000,000 | |||||
6(Base Project Allocation - $5,000,000) |
| |||||
| ||||||
9(A) Acquisition, infrastructure, |
| |||||
13Project Allocation | 2,000,000 | |||||
14(Base Project Allocation - $2,000,000) |
| |||||
<-15(iii) Geisinger Authority |
| |||||
16(A) Construction, infrastructure, |
| |||||
20Project Allocation | 3,000,000 | |||||
21(Base Project Allocation - $3,000,000) |
| |||||
22(iv) Centre Hall Borough/Potter Township |
| |||||
23(A) Construction, infrastructure and |
| |||||
25Project Allocation | 2,500,000 | |||||
26(Base Project Allocation - $2,500,000) |
| |||||
27(v) College Township |
| |||||
28(A) Construction, infrastructure and
1for Centre County Recycling and Refuse |
| |||||
3Project Allocation | 500,000 | |||||
4(Base Project Allocation - $500,000) |
| |||||
5(vi) State College Borough |
| |||||
6(A) Construction, infrastructure and |
| |||||
10Project Allocation | 5,000,000 | |||||
11(Base Project Allocation - $5,000,000) |
| |||||
12(15) Chester County |
| |||||
13(i) County projects |
| |||||
14(A) Acquisition, infrastructure, |
| |||||
17Project Allocation | 5,000,000 | |||||
18(Base Project Allocation - $5,000,000) |
| |||||
19(B) Acquisition, infrastructure, |
| |||||
23Project Allocation | 5,000,000 | |||||
24(Base Project Allocation - $5,000,000) |
| |||||
25(C) Acquisition, infrastructure, |
| |||||
29Project Allocation | 5,000,000 | |||||
30(Base Project Allocation - $5,000,000) |
| |||||
1(D) Construction, infrastructure and |
| |||||
5Project Allocation | 2,000,000 | |||||
6(Base Project Allocation - $2,000,000) |
| |||||
7(E) Construction, infrastructure and |
| |||||
11Project Allocation | 2,400,000 | |||||
12(Base Project Allocation - $2,400,000) |
| |||||
| ||||||
15(A) Acquisition, infrastructure, |
| |||||
21Project Allocation | 10,000,000 | |||||
| ||||||
24(B) Acquisition, infrastructure, |
| |||||
28Project Allocation | 15,000,000 | |||||
| ||||||
| ||||||
<-3(A) Acquisition, infrastructure, |
| |||||
7Project Allocation | 2,500,000 | |||||
8(Base Project Allocation - $2,500,000) |
| |||||
<-9(B) (A) Acquisition, demolition, |
| |||||
18Project Allocation | 10,000,000 | |||||
| ||||||
<-21(C) (B) Acquisition, construction, |
| |||||
25Project Allocation | 1,000,000 | |||||
26(Base Project Allocation - $1,000,000) |
| |||||
27(iii.1) Downingtown Borough |
| |||||
28(A) Construction, infrastructure,
1Downingtown Transportation Center |
| |||||
2Project Allocation | 5,000,000 | |||||
3(Base Project Allocation - $5,000,000) |
| |||||
<-4(iii.2) Easttown Township |
| |||||
5(A) Construction, renovation, demolition, |
| |||||
9Project Allocation | 4,000,000 | |||||
10(Base Project Allocation - $4,000,000) |
| |||||
11(iv) East Whiteland Township |
| |||||
12(A) Construction, infrastructure |
| |||||
16Project Allocation | 1,000,000 | |||||
17(Base Project Allocation - $1,000,000) |
| |||||
18(B) Construction, infrastructure |
| |||||
22Project Allocation | 8,000,000 | |||||
23(Base Project Allocation - $8,000,000) |
| |||||
24(v) Malvern Borough |
| |||||
25(A) Construction, infrastructure, |
| |||||
29Project Allocation | 5,000,000 | |||||
30(Base Project Allocation - $5,000,000) |
| |||||
1(vi) Phoenixville Borough |
| |||||
2(A) Construction, infrastructure |
| |||||
5Project Allocation | 4,000,000 | |||||
6(Base Project Allocation - $4,000,000) |
| |||||
7(B) Mixed-use development, including |
| |||||
11Project Allocation | 5,000,000 | |||||
12(Base Project Allocation - $5,000,000) |
| |||||
<-13(C) Construction, acquisition, |
| |||||
18Project Allocation | 2,000,000 | |||||
19(Base Project Allocation - $2,000,000) |
| |||||
20(D) Construction, renovation and other |
| |||||
25Project Allocation | 750,000 | |||||
26(Base Project Allocation - $750,000) |
| |||||
27(vi.1) Schuylkill Township |
| |||||
28(A) Construction and other related costs
1range, installation of geothermal and |
| |||||
3Project Allocation | 1,250,000 | |||||
4(Base Project Allocation - $1,250,000) |
| |||||
5(B) Construction, renovation, demolition, |
| |||||
9Project Allocation | 4,500,000 | |||||
10(Base Project Allocation - $4,500,000) |
| |||||
11(vii) Upper Uwchlan Township |
| |||||
12(A) Construction, infrastructure and |
| |||||
18Project Allocation | 700,000 | |||||
19(Base Project Allocation - $700,000) |
| |||||
20(B) Construction and other related costs |
| |||||
24Project Allocation | 910,000 | |||||
25(Base Project Allocation - $910,000) |
| |||||
26(viii) Uwchlan Township |
| |||||
27(A) Construction, infrastructure and |
| |||||
30Project Allocation | 10,000,000 | |||||
| ||||||
3(B) Construction, infrastructure and |
| |||||
7Project Allocation | 2,000,000 | |||||
8(Base Project Allocation - $2,000,000) |
| |||||
9(ix) West Chester Borough |
| |||||
10(A) Acquisition, construction, |
| |||||
14Project Allocation | 500,000 | |||||
15(Base Project Allocation - $500,000) |
| |||||
16(B) Acquisition, construction, |
| |||||
20Project Allocation | 7,000,000 | |||||
21(Base Project Allocation - $7,000,000) |
| |||||
22(C) Acquisition, construction, |
| |||||
26Project Allocation | 2,500,000 | |||||
27(Base Project Allocation - $2,500,000) |
| |||||
28(16) Clarion County |
| |||||
29(i) (Reserved) |
| |||||
<-30(ii) Monroe Township |
| |||||
1(A) Acquisition, infrastructure, |
| |||||
4Project Allocation | 1,000,000 | |||||
5(Base Project Allocation - $1,000,000) |
| |||||
6(B) Acquisition, construction, |
| |||||
9Project Allocation | 3,000,000 | |||||
10(Base Project Allocation - $3,000,000) |
| |||||
11(17) Clearfield County |
| |||||
12(i) County projects |
| |||||
13(A) Acquisition, infrastructure, |
| |||||
16Project Allocation | 10,000,000 | |||||
| ||||||
| ||||||
21(A) Acquisition, infrastructure, |
| |||||
25Project Allocation | 2,000,000 | |||||
26(Base Project Allocation - $2,000,000) |
| |||||
27(iii) City of DuBois |
| |||||
28(A) Infrastructure, construction and
1DuBois Regional Medical Center |
| |||||
2Project Allocation | 7,500,000 | |||||
3(Base Project Allocation - $7,500,000) |
| |||||
4(18) Clinton County |
| |||||
5(i) County projects |
| |||||
6(A) Acquisition, infrastructure, |
| |||||
9Project Allocation | 10,000,000 | |||||
| ||||||
<-12(B) Acquisition, construction, facility |
| |||||
16Project Allocation | 2,500,000 | |||||
17(Base Project Allocation - $2,500,000) |
| |||||
<-18(ii) Lock Haven |
| |||||
19(A) Construction, infrastructure and |
| |||||
23Project Allocation | 1,500,000 | |||||
24(Base Project Allocation - $1,500,000) |
| |||||
25(B) Construction and other related costs |
| |||||
28Project Allocation | 5,000,000 | |||||
29(Base Project Allocation - $5,000,000) |
| |||||
30(ii) <-(iii) Wayne Township |
| |||||
1(A) Acquisition, construction and related |
| |||||
4Project Allocation | 750,000 | |||||
5(Base Project Allocation - $750,000) |
| |||||
6(B) Demolition, construction and related |
| |||||
10Project Allocation | 1,000,000 | |||||
11(Base Project Allocation - $1,000,000) |
| |||||
12(C) Construction and infrastructure for a |
| |||||
15Project Allocation | 2,500,000 | |||||
16(Base Project Allocation - $2,500,000) |
| |||||
17(D) Construction and related |
| |||||
21Project Allocation | 1,000,000 | |||||
22(Base Project Allocation - $1,000,000) |
| |||||
23(E) Acquisition, construction and related |
| |||||
27Project Allocation | 750,000 | |||||
28(Base Project Allocation - $750,000) |
| |||||
29(F) Construction and related
1collect and process landfill gas into |
| |||||
3Project Allocation | 1,500,000 | |||||
4(Base Project Allocation - $1,500,000) |
| |||||
5(19) Columbia County |
| |||||
<-6(i) (Reserved) |
| |||||
<-7(i) County projects |
| |||||
8(A) Renovations and upgrades to Ber |
| |||||
10Project Allocation | 2,750,000 | |||||
11(Base Project Allocation - $2,750,000) |
| |||||
12(20) Crawford County |
| |||||
13(i) County projects |
| |||||
14(A) Acquisition, infrastructure, and |
| |||||
18Project Allocation | 1,000,000 | |||||
19(Base Project Allocation - $1,000,000) |
| |||||
20(B) Acquisition, infrastructure, |
| |||||
24Project Allocation | 2,000,000 | |||||
25(Base Project Allocation - $2,000,000) |
| |||||
26(ii) Conneaut Valley Economic and Industrial |
| |||||
28(A) Acquisition, rehabilitation,
1materials, for regional economic |
| |||||
4Project Allocation | 1,500,000 | |||||
5(Base Project Allocation - $1,500,000) |
| |||||
| ||||||
8(A) Acquisition, infrastructure |
| |||||
14Project Allocation | 1,000,000 | |||||
15(Base Project Allocation - $1,000,000) |
| |||||
16(B) Acquisition, infrastructure |
| |||||
22Project Allocation | 1,000,000 | |||||
23(Base Project Allocation - $1,000,000) |
| |||||
24(C) Acquisition, infrastructure |
| |||||
30Project Allocation | 2,000,000 | |||||
1(Base Project Allocation - $2,000,000) |
| |||||
2(D) Acquisition, infrastructure, |
| |||||
6Project Allocation | 25,000,000 | |||||
| ||||||
| ||||||
11(A) Acquisition, infrastructure, |
| |||||
17Project Allocation | 2,500,000 | |||||
18(Base Project Allocation - $2,500,000) |
| |||||
19(B) Construction, infrastructure and |
| |||||
22Project Allocation | 10,000,000 | |||||
| ||||||
25(v) Titusville Redevelopment Authority |
| |||||
26(A) Infrastructure, construction and |
| |||||
30Project Allocation | 500,000 | |||||
1(Base Project Allocation - $500,000) |
| |||||
2(B) Acquisition, rehabilitation, |
| |||||
8Project Allocation | 1,000,000 | |||||
9(Base Project Allocation - $1,000,000) |
| |||||
10(C) Infrastructure, renovation and |
| |||||
14Project Allocation | 1,500,000 | |||||
15(Base Project Allocation - $1,500,000) |
| |||||
16(D) Infrastructure and other related |
| |||||
21Project Allocation | 2,000,000 | |||||
22(Base Project Allocation - $2,000,000) |
| |||||
<-23(vi) Conneaut Lake Borough |
| |||||
24(A) Construction, infrastructure, |
| |||||
28Project Allocation | 4,000,000 | |||||
29(Base Project Allocation - $4,000,000) |
| |||||
30(21) Cumberland County |
| |||||
<-1(i) (Reserved) |
| |||||
<-2(i.1) (ii) Camp Hill Borough |
| |||||
3(A) Land acquisition, construction, |
| |||||
8Project Allocation | 5,000,000 | |||||
9(Base Project Allocation - $5,000,000) |
| |||||
<-10(i.2) (iii) East Pennsboro Township |
| |||||
11(A) Land acquisition, infrastructure |
| |||||
19Project Allocation | 3,500,000 | |||||
20(Base Project Allocation - $3,500,000) |
| |||||
<-21(i.3) (iv) Hampden Township |
| |||||
22(A) Construction, acquisition, |
| |||||
26Project Allocation | 10,000,000 | |||||
| ||||||
<-29(B) Acquisition, infrastructure, |
| |||||
3Project Allocation | 10,000,000 | |||||
| ||||||
<-6(i.4) (v) Hampden Township |
| |||||
7(A) Purchase, renovation and other |
| |||||
11Project Allocation | 3,740,000 | |||||
12(Base Project Allocation - $3,740,000) |
| |||||
<-13(vi) Borough of Lemoyne |
| |||||
14(A) Construction, infrastructure and |
| |||||
17Project Allocation | 1,500,000 | |||||
18(Base Project Allocation - $1,500,000) |
| |||||
19(i) <-(i.5) (vii) Borough of Shippensburg |
| |||||
20(A) Acquisition, infrastructure, |
| |||||
24Project Allocation | 2,500,000 | |||||
25(Base Project Allocation - $2,500,000) |
| |||||
26(B) Renovations, redevelopment and other |
| |||||
29Project Allocation | 1,000,000 | |||||
30(Base Project Allocation - $1,000,000) |
| |||||
<-1(ii) (viii) Silver Spring Township |
| |||||
2(A) Land acquisition, infrastructure |
| |||||
7Project Allocation | 3,000,000 | |||||
8(Base Project Allocation - $3,000,000) |
| |||||
<-9(B) Purchase, renovation and other |
| |||||
13Project Allocation | 3,740,000 | |||||
14(Base Project Allocation - $3,740,000) |
| |||||
15(iii) (ix)<- South Middleton Township |
| |||||
16(A) Construction and other related costs |
| |||||
21Project Allocation | 2,000,000 | |||||
22(Base Project Allocation - $2,000,000) |
| |||||
<-23(x) Wormleysburg Borough |
| |||||
24(A) Construction, infrastructure and |
| |||||
28Project Allocation | 2,000,000 | |||||
29(Base Project Allocation - $2,000,000) |
| |||||
30(22) Dauphin County |
| |||||
1(i) County projects |
| |||||
2(A) Construction and other related costs |
| |||||
6Project Allocation | 24,000,000 | |||||
| ||||||
9(B) Acquisition, construction, |
| |||||
13Project Allocation | 1,000,000 | |||||
14(Base Project Allocation - $1,000,000) |
| |||||
15(C) Construction and infrastructure |
| |||||
18Project Allocation | 1,100,000 | |||||
19(Base Project Allocation - $1,100,000) |
| |||||
<-20(D) Acquisition, construction and related |
| |||||
26Project Allocation | 3,500,000 | |||||
27(Base Project Allocation - $3,500,000) |
| |||||
<-28(E) Construction of firearm manufacturing
1Airport (HIA) |
| |||||
2Project Allocation | 38,000,000 | |||||
| ||||||
5(ii) City of Harrisburg |
| |||||
6(A) Acquisition, construction, |
| |||||
10Project Allocation | 1,500,000 | |||||
11(Base Project Allocation - $1,500,000) |
| |||||
<-12(B) Construction, renovation, |
| |||||
17Project Allocation | 8,000,000 | |||||
18(Base Project Allocation - $8,000,000) |
| |||||
19(C) Acquisition, construction, |
| |||||
24Project Allocation | 2,000,000 | |||||
25(Base Project Allocation - $2,000,000) |
| |||||
26(D) Acquisition, construction, |
| |||||
29Project Allocation | 20,000,000 | |||||
30(Base Project Allocation -
1$20,000,000) |
| |||||
2(E) Acquisition, construction and other |
| |||||
5Project Allocation | 10,000,000 | |||||
| ||||||
8(F) Acquisition, renovation, |
| |||||
14Project Allocation | 1,000,000 | |||||
15(Base Project Allocation - $1,000,000) |
| |||||
<-16(G) Acquisition, construction, |
| |||||
21Project Allocation | 6,000,000 | |||||
22(Base Project Allocation - $6,000,000) |
| |||||
23(iii) Derry Township |
| |||||
24(A) Acquisition, construction, |
| |||||
28Project Allocation | 350,000 | |||||
29(Base Project Allocation - $350,000) |
| |||||
<-30(iii.1) East Hanover Township |
| |||||
1(A) Purchase, renovation and other |
| |||||
5Project Allocation | 3,740,000 | |||||
6(Base Project Allocation - $3,740,000) |
| |||||
7(iv) Londonderry Township |
| |||||
8(A) Construction, infrastructure and |
| |||||
12Project Allocation | 1,000,000 | |||||
13(Base Project Allocation - $1,000,000) |
| |||||
<-14(iv.1) Lower Paxton Township |
| |||||
15(A) Construction, infrastructure and |
| |||||
19Project Allocation | 725,000 | |||||
20(Base Project Allocation - $725,000) |
| |||||
21(B) Purchase, renovation and other |
| |||||
25Project Allocation | 3,740,000 | |||||
26(Base Project Allocation - $3,740,000) |
| |||||
<-27(C) Acquisition, infrastructure, |
| |||||
1Project Allocation | 10,000,000 | |||||
| ||||||
4(iv.2) Middle Paxton Township |
| |||||
5(A) Construction, infrastructure, |
| |||||
9Project Allocation | 3,000,000 | |||||
10(Base Project Allocation - $3,000,000) |
| |||||
<-11(iv.3) South Hanover Township |
| |||||
12(A) Acquisition, construction, |
| |||||
16Project Allocation | 2,500,000<- | |||||
17(Base Project Allocation - $2,500,000) |
| |||||
18(v) Swatara Township |
| |||||
19(A) Acquisition, construction, |
| |||||
23Project Allocation | 1,000,000 | |||||
24(Base Project Allocation - $1,000,000) |
| |||||
<-25(v.1) Susquehanna Township |
| |||||
26(A) Purchase, renovation and other |
| |||||
30Project Allocation | 3,740,000 | |||||
1(Base Project Allocation - $3,740,000) |
| |||||
2(23) Delaware County |
| |||||
3(i) County projects |
| |||||
4(A) Acquisition, infrastructure, |
| |||||
9Project Allocation | 2,000,000 | |||||
10(Base Project Allocation - $2,000,000) |
| |||||
11(B) Delaware County Housing Authority, |
| |||||
18Project Allocation | 1,500,000 | |||||
19(Base Project Allocation - $1,500,000) |
| |||||
<-20(C) Construction, renovations and other |
| |||||
25Project Allocation | 4,000,000 | |||||
26(Base Project Allocation - $4,000,000) |
| |||||
27(i.1) Chester Economic Development Authority |
| |||||
28(A) Construction, expansion,
1rehabilitation, renovation and other |
| |||||
5Project Allocation | 15,000,000 | |||||
| ||||||
8(i.2) Delaware County Commerce Center |
| |||||
9(A) Acquisition, infrastructure, |
| |||||
13Project Allocation | 12,500,000 | |||||
| ||||||
<-16(B) Construction, infrastructure, |
| |||||
20Project Allocation | 3,000,000 | |||||
21(Base Project Allocation - $3,000,000) |
| |||||
| ||||||
24(A) Infrastructure, construction and |
| |||||
27Project Allocation | 4,200,000 | |||||
28(Base Project Allocation - $4,200,000) |
| |||||
29(B) Infrastructure, construction, public |
| |||||
3Project Allocation | 5,000,000 | |||||
4(Base Project Allocation - $5,000,000) |
| |||||
5(C) Acquisition, site preparation, |
| |||||
10Project Allocation | 20,000,000 | |||||
| ||||||
<-13(D) Acquisition, site preparation, |
| |||||
19Project Allocation | 5,000,000 | |||||
20(Base Project Allocation - $5,000,000) |
| |||||
<-21(E) Construction, infrastructure and |
| |||||
25Project Allocation | 5,798,000 | |||||
26(Base Project Allocation - $5,798,000) |
| |||||
27(iii) Delaware County Redevelopment Authority |
| |||||
28(A) Site preparation, installation of
1installation of sidewalks and fencing |
| |||||
5Project Allocation | 300,000 | |||||
6(Base Project Allocation - $300,000) |
| |||||
7(B) Infrastructure, renovations, |
| |||||
12Project Allocation | 500,000 | |||||
13(Base Project Allocation - $500,000) |
| |||||
14(C) Acquisition, infrastructure, |
| |||||
21Project Allocation | 1,750,000 | |||||
22(Base Project Allocation - $1,750,000) |
| |||||
23(D) Infrastructure, construction, |
| |||||
27Project Allocation | 3,000,000 | |||||
28(Base Project Allocation - $3,000,000) |
| |||||
29(E) Acquisition, design, infrastructure,
1related costs for construction of |
| |||||
6Project Allocation | 3,000,000 | |||||
7(Base Project Allocation - $3,000,000) |
| |||||
8(F) Acquisition, infrastructure, |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $5,000,000) |
| |||||
15(G) Acquisition, design, infrastructure, |
| |||||
20Project Allocation | 10,000,000 | |||||
| ||||||
23(H) Acquisition, infrastructure, |
| |||||
29Project Allocation | 2,500,000 | |||||
30(Base Project Allocation - $2,500,000) |
| |||||
1(I) Land acquisition, infrastructure |
| |||||
7Project Allocation | 10,000,000 | |||||
| ||||||
<-10(J) Redevelopment, construction, |
| |||||
15Project Allocation | 7,500,000 | |||||
16(Base Project Allocation - $7,500,000) |
| |||||
17(K) Redevelopment, construction, |
| |||||
21Project Allocation | 1,000,000 | |||||
22(Base Project Allocation - $1,000,000) |
| |||||
<-23(L) Construction, infrastructure and
1University in Radnor Township |
| |||||
2Project Allocation | 10,000,000 | |||||
| ||||||
5(M) Construction, acquisition, railroad |
| |||||
9Project Allocation | 10,000,000 | |||||
| ||||||
12(iv) City of Chester |
| |||||
13(A) Acquisition, infrastructure, |
| |||||
18Project Allocation | 3,000,000 | |||||
19(Base Project Allocation - $3,000,000) |
| |||||
<-20(B) Acquisition, construction, |
| |||||
26Project Allocation | 10,000,000 | |||||
| ||||||
29(C) Acquisition, construction,
1other related costs for parking |
| |||||
4Project Allocation | 15,000,000 | |||||
| ||||||
7(D) Acquisition, construction, |
| |||||
11Project Allocation | 15,000,000 | |||||
| ||||||
14(E) Acquisition, construction, |
| |||||
19Project Allocation | 20,000,000 | |||||
| ||||||
22(F) Acquisition, construction, |
| |||||
26Project Allocation | 10,000,000 | |||||
| ||||||
<-29(iv.1) Chester Township |
| |||||
30(A) Construction and other related costs
1for fire station |
| |||||
2Project Allocation | 1,000,000 | |||||
3(Base Project Allocation - $1,000,000) |
| |||||
4(v) Borough of Eddystone |
| |||||
5(A) Acquisition, infrastructure, |
| |||||
10Project Allocation | 1,000,000 | |||||
11(Base Project Allocation - $1,000,000) |
| |||||
<-12(vi) Glenolden Borough |
| |||||
13(A) Acquisition, construction and other |
| |||||
17Project Allocation | 500,000 | |||||
18(Base Project Allocation - $500,000) |
| |||||
19(vii) Marple Township |
| |||||
20(A) Construction, infrastructure and |
| |||||
24Project Allocation | 4,100,000 | |||||
25(Base Project Allocation - $4,100,000) |
| |||||
26(B) Construction, infrastructure, |
| |||||
30Project Allocation | 654,000 | |||||
1(Base Project Allocation - $654,000) |
| |||||
2(C) Site preparation, infrastructure, |
| |||||
6Project Allocation | 3,250,000 | |||||
7(Base Project Allocation - $3,250,000) |
| |||||
8(viii) Borough of Media |
| |||||
9(A) Construction, infrastructure, |
| |||||
13Project Allocation | 750,000 | |||||
14(Base Project Allocation - $750,000) |
| |||||
15(viii.1) Millbourne Borough |
| |||||
16(A) Construction, infrastructure and |
| |||||
19Project Allocation | 4,200,000 | |||||
20(Base Project Allocation - $4,200,000) |
| |||||
21(ix) Morton Borough |
| |||||
22(A) Construction, renovation and other |
| |||||
27Project Allocation | 500,000 | |||||
28(Base Project Allocation - $500,000) |
| |||||
29(x) Newtown Township |
| |||||
30(A) Acquisition, construction,
1infrastructure, redevelopment and |
| |||||
4Project Allocation | 5,000,000 | |||||
5(Base Project Allocation - $5,000,000) |
| |||||
6(xi) Norwood Borough |
| |||||
| ||||||
9Project Allocation | 500,000 | |||||
10(Base Project Allocation - $500,000) |
| |||||
11(xii) Prospect Park Borough |
| |||||
12(A) Construction, redevelopment, |
| |||||
16Project Allocation | 800,000 | |||||
17(Base Project Allocation - $800,000) |
| |||||
18(vi) <-(xiii) Radnor Township |
| |||||
19(A) Construction, renovation and |
| |||||
23Project Allocation | 10,000,000 | |||||
| ||||||
<-26(B) Construction, redevelopment and other |
| |||||
29Project Allocation | 1,050,000 | |||||
30(Base Project Allocation - $1,050,000) |
| |||||
1(C) Construction, infrastructure and |
| |||||
4Project Allocation | 700,000 | |||||
5(Base Project Allocation - $700,000) |
| |||||
6(D) Construction, infrastructure, |
| |||||
10Project Allocation | 500,000 | |||||
11(Base Project Allocation - $500,000) |
| |||||
12(E) Upgrades and deferred maintenance, |
| |||||
15Project Allocation | 550,000 | |||||
16(Base Project Allocation - $550,000) |
| |||||
<-17(xiii.1) Ridley Park Borough |
| |||||
18(A) Infrastructure improvements, |
| |||||
22Project Allocation | 4,000,000 | |||||
23(Base Project Allocation - $4,000,000) |
| |||||
24(xiv) Sharon Hill Borough |
| |||||
25(A) Renovations, construction, energy |
| |||||
29Project Allocation | 500,000 | |||||
30(Base Project Allocation - $500,000) |
| |||||
1(xv) Springfield Township |
| |||||
2(A) Rehabilitation, renovation, |
| |||||
6Project Allocation | 1,000,000 | |||||
7(Base Project Allocation - $1,000,000) |
| |||||
8(B) Renovations and other related costs |
| |||||
13Project Allocation | 500,000 | |||||
14(Base Project Allocation - $500,000) |
| |||||
15(C) Renovation, infrastructure and other |
| |||||
18Project Allocation | 1,000,000 | |||||
19(Base Project Allocation - $1,000,000) |
| |||||
20(D) Construction, infrastructure and |
| |||||
23Project Allocation | 3,000,000 | |||||
24(Base Project Allocation - $3,000,000) |
| |||||
25(E) Renovation, infrastructure and other |
| |||||
28Project Allocation | 2,500,000 | |||||
29(Base Project Allocation - $2,500,000) |
| |||||
30(xvi) Tinicum Township |
| |||||
1(A) Construction, redevelopment, |
| |||||
6Project Allocation | 3,000,000 | |||||
7(Base Project Allocation - $3,000,000) |
| |||||
<-8(xvii) Upland Borough |
| |||||
9(A) Upgrade central heat and cooling |
| |||||
13Project Allocation | 8,000,000 | |||||
14(Base Project Allocation - $8,000,000) |
| |||||
15(xvii)<- (xviii) Upper Providence Township |
| |||||
16(A) Construction, infrastructure and |
| |||||
21Project Allocation | 1,200,000 | |||||
22(Base Project Allocation - $1,200,000) |
| |||||
23(24) Elk County |
| |||||
24(i) County projects |
| |||||
25(A) Acquisition, infrastructure, |
| |||||
28Project Allocation | 10,000,000 | |||||
| ||||||
1(ii) Elk County Redevelopment Authority |
| |||||
2(A) Acquisition, renovation, |
| |||||
8Project Allocation | 4,000,000 | |||||
9(Base Project Allocation - $4,000,000) |
| |||||
10(25) Erie County |
| |||||
11(i) County Projects |
| |||||
12(A) Acquisition, construction, |
| |||||
16Project Allocation | 250,000 | |||||
17(Base Project Allocation - $250,000) |
| |||||
<-18(B) Acquisition, construction, |
| |||||
23Project Allocation | 2,500,000 | |||||
24(Base Project Allocation - $2,500,000) |
| |||||
25(C) Acquisition, construction, |
| |||||
30Project Allocation | 2,500,000 | |||||
1(Base Project Allocation - $2,500,000) |
| |||||
2(ii) Boroughs of Albion and Crainesville; |
| |||||
4(A) Construct rail improvements and |
| |||||
7Project Allocation | 12,000,000 | |||||
| ||||||
| ||||||
12(A) Acquisition, redevelopment and |
| |||||
16Project Allocation | 2,500,000 | |||||
17(Base Project Allocation - $2,500,000) |
| |||||
| ||||||
20(A) Infrastructure, construction, |
| |||||
24Project Allocation | 1,000,000 | |||||
25(Base Project Allocation - $1,000,000) |
| |||||
26(v) Erie City |
| |||||
27(A) Construction, infrastructure and |
| |||||
1Project Allocation | 5,100,000 | |||||
2(Base Project Allocation - $5,100,000) |
| |||||
3(B) Construct rail improvements and ship |
| |||||
5Project Allocation | 9,000,000 | |||||
6(Base Project Allocation - $9,000,000) |
| |||||
<-7(C) Construction, infrastructure and |
| |||||
10Project Allocation | 3,000,000 | |||||
11(Base Project Allocation - $3,000,000) |
| |||||
12(v.1) Conneaut Township |
| |||||
13(A) Acquisition, construction and other |
| |||||
18Project Allocation | 8,075,000 | |||||
19(Base Project Allocation - $8,075,000) |
| |||||
20(26) Fayette County |
| |||||
21(i) Bullskin Township |
| |||||
22(A) Construction, infrastructure and |
| |||||
25Project Allocation | 2,500,000 | |||||
26(Base Project Allocation - $2,500,000) |
| |||||
27(ii) City of Uniontown |
| |||||
28(A) Acquisition, infrastructure,
1Apartments |
| |||||
2Project Allocation | 750,000 | |||||
3(Base Project Allocation - $750,000) |
| |||||
4(iii) Connellsville City |
| |||||
5(A) Construction, redevelopment, |
| |||||
9Project Allocation | 1,150,000 | |||||
10(Base Project Allocation - $1,150,000) |
| |||||
11(27) Forest County |
| |||||
12(i) (Reserved) |
| |||||
13(28) Franklin County |
| |||||
14(i) Franklin County Redevelopment Authority |
| |||||
15(A) Acquisition, construction, |
| |||||
19Project Allocation | 2,000,000 | |||||
20(Base Project Allocation - $2,000,000) |
| |||||
21(B) Infrastructure, construction and |
| |||||
26Project Allocation | 5,000,000 | |||||
27(Base Project Allocation - $5,000,000) |
| |||||
28(C) Acquisition, infrastructure,
1School for Veterans' Children campus, |
| |||||
4Project Allocation | 7,500,000 | |||||
5(Base Project Allocation - $7,500,000) |
| |||||
6(D) Acquisition, infrastructure, |
| |||||
11Project Allocation | 15,000,000 | |||||
| ||||||
14(E) Infrastructure, construction, |
| |||||
18Project Allocation | 10,000,000 | |||||
| ||||||
21(ii) Chambersburg Borough |
| |||||
22(A) Acquisition, infrastructure, design, |
| |||||
30Project Allocation | 7,000,000 | |||||
1(Base Project Allocation - $7,000,000) |
| |||||
2(B) Acquisition, infrastructure, design, |
| |||||
11Project Allocation | 7,000,000 | |||||
12(Base Project Allocation - $7,000,000) |
| |||||
<-13(C) Purchase, renovation and other |
| |||||
17Project Allocation | 3,740,000 | |||||
18(Base Project Allocation - $3,740,000) |
| |||||
19(iii) Borough of Shippensburg |
| |||||
20(A) Construction, rehabilitation and |
| |||||
23Project Allocation | 2,500,000 | |||||
24(Base Project Allocation - $2,500,000) |
| |||||
25(iv) Borough of Waynesboro |
| |||||
26(A) Acquisition, construction, |
| |||||
30Project Allocation | 2,000,000 | |||||
1(Base Project Allocation - $2,000,000) |
| |||||
2(29) Fulton County |
| |||||
3(i) (Reserved)<- |
| |||||
<-4(i) County projects |
| |||||
5(A) Acquisition, construction, |
| |||||
10Project Allocation | 4,000,000 | |||||
11(Base Project Allocation - $4,000,000) |
| |||||
12(30) Greene County |
| |||||
13(i) Franklin Township |
| |||||
14(A) Acquisition, construction, |
| |||||
18Project Allocation | 2,500,000 | |||||
19(Base Project Allocation - $2,500,000) |
| |||||
20(B) Acquisition, construction, |
| |||||
24Project Allocation | 2,000,000 | |||||
25(Base Project Allocation - $2,000,000) |
| |||||
26(C) Acquisition, construction, |
| |||||
30Project Allocation | 5,000,000 | |||||
1(Base Project Allocation - $5,000,000) |
| |||||
<-2(D) Acquisition, construction, facility |
| |||||
6Project Allocation | 2,000,000 | |||||
7(Base Project Allocation - $2,000,000) |
| |||||
<-8(ii) Waynesburg Borough |
| |||||
9(A) Acquisition, construction, |
| |||||
13Project Allocation | 7,000,000 | |||||
14(Base Project Allocation - $7,000,000) |
| |||||
15(B) Acquisition, construction, |
| |||||
19Project Allocation | 3,500,000 | |||||
20(Base Project Allocation - $3,500,000) |
| |||||
21(31) Huntingdon County |
| |||||
22(i) County projects |
| |||||
23(A) Acquisition, construction, |
| |||||
27Project Allocation | 3,000,000 | |||||
28(Base Project Allocation - $3,000,000) |
| |||||
29(ii) Huntingdon County Business and Industry |
| |||||
1(A) Acquisition, renovation, expansion |
| |||||
4Project Allocation | 2,500,000 | |||||
5(Base Project Allocation - $2,500,000) |
| |||||
6(32) Indiana County |
| |||||
7(i) County projects |
| |||||
8(A) Acquisition, engineering, site |
| |||||
13Project Allocation | 1,000,000 | |||||
14(Base Project Allocation - $1,000,000) |
| |||||
15(B) Acquisition, engineering, site |
| |||||
21Project Allocation | 1,000,000 | |||||
22(Base Project Allocation - $1,000,000) |
| |||||
23(C) Acquisition, engineering, site |
| |||||
29Project Allocation | 2,000,000 | |||||
30(Base Project Allocation - $2,000,000) |
| |||||
1(D) Acquisition, engineering, site |
| |||||
6Project Allocation | 2,000,000 | |||||
7(Base Project Allocation - $2,000,000) |
| |||||
8(E) Acquisition, engineering, |
| |||||
12Project Allocation | 2,000,000 | |||||
13(Base Project Allocation - $2,000,000) |
| |||||
14(F) Acquisition, engineering, site |
| |||||
20Project Allocation | 3,000,000 | |||||
21(Base Project Allocation - $3,000,000) |
| |||||
22(G) Acquisition, engineering, site |
| |||||
27Project Allocation | 3,000,000 | |||||
28(Base Project Allocation - $3,000,000) |
| |||||
29(H) Acquisition, engineering, site
1construction and other related costs, |
| |||||
6Project Allocation | 3,000,000 | |||||
7(Base Project Allocation - $3,000,000) |
| |||||
8(I) Acquisition, engineering, site |
| |||||
15Project Allocation | 3,000,000 | |||||
16(Base Project Allocation - $3,000,000) |
| |||||
17(J) Acquisition, engineering, site |
| |||||
24Project Allocation | 4,000,000 | |||||
25(Base Project Allocation - $4,000,000) |
| |||||
26(K) Renovation, construction and other |
| |||||
1Project Allocation | 4,000,000 | |||||
2(Base Project Allocation - $4,000,000) |
| |||||
<-3(ii) Clymer Borough |
| |||||
4(A) Acquisition, infrastructure, |
| |||||
10Project Allocation | 1,650,000 | |||||
11(Base Project Allocation - $1,650,000) |
| |||||
12(iii) Green Township |
| |||||
13(A) Construction, excavation, |
| |||||
17Project Allocation | 1,500,000 | |||||
18(Base Project Allocation - $1,500,000) |
| |||||
19(33) Jefferson County |
| |||||
20(i) County projects |
| |||||
21(A) Acquisition, infrastructure, |
| |||||
24Project Allocation | 10,000,000 | |||||
| ||||||
<-27(B) Development, construction, |
| |||||
30Project Allocation | 2,500,000 | |||||
1(Base Project Allocation - $2,500,000) |
| |||||
2(ii) Brockway Borough |
| |||||
3(A) Acquisition, infrastructure, |
| |||||
7Project Allocation | 10,000,000 | |||||
| ||||||
10(B) Acquisition, infrastructure, |
| |||||
14Project Allocation | 10,000,000 | |||||
| ||||||
17(iii) Eldred Township |
| |||||
18(A) Acquisition, infrastructure, |
| |||||
22Project Allocation | 1,000,000 | |||||
23(Base Project Allocation - $1,000,000) |
| |||||
24(34) Juniata County |
| |||||
25(i) (Reserved) |
| |||||
26(35) Lackawanna County |
| |||||
27(i) County projects |
| |||||
28(A) Acquisition, construction,
1Industrial Facility |
| |||||
2Project Allocation | 5,000,000 | |||||
3(Base Project Allocation - $5,000,000) |
| |||||
4(B) Acquisition, construction, |
| |||||
9Project Allocation | 20,000,000 | |||||
| ||||||
12(C) Acquisition, construction, |
| |||||
17Project Allocation | 2,000,000 | |||||
18(Base Project Allocation - $2,000,000) |
| |||||
19(ii) Archbald Borough |
| |||||
20(A) Construction, infrastructure and |
| |||||
23Project Allocation | 1,000,000 | |||||
24(Base Project Allocation - $1,000,000) |
| |||||
25(B) Construction, infrastructure and |
| |||||
29Project Allocation | 1,500,000 | |||||
30(Base Project Allocation - $1,500,000) |
| |||||
1(C) Construction, infrastructure and |
| |||||
4Project Allocation | 2,000,000 | |||||
5(Base Project Allocation - $2,000,000) |
| |||||
6(D) Construction, infrastructure and |
| |||||
10Project Allocation | 2,000,000 | |||||
11(Base Project Allocation - $2,000,000) |
| |||||
<-12(E) Acquisition, construction, |
| |||||
18Project Allocation | 1,000,000 | |||||
19(Base Project Allocation - $1,000,000) |
| |||||
20(F) Construction, infrastructure and |
| |||||
24Project Allocation | 2,500,000 | |||||
25(Base Project Allocation - $2,500,000) |
| |||||
26(ii.1) Archbald, Jessup and Blakely Boroughs |
| |||||
27(A) Acquisition, construction,
1Community Civic Center project |
| |||||
2Project Allocation | 2,500,000 | |||||
3(Base Project Allocation - $2,500,000) |
| |||||
4(iii) Blakely Borough |
| |||||
5(A) Construction, infrastructure and |
| |||||
9Project Allocation | 3,500,000 | |||||
10(Base Project Allocation - $3,500,000) |
| |||||
11(iv) Carbondale Township |
| |||||
12(A) Construction, infrastructure and |
| |||||
16Project Allocation | 361,000 | |||||
17(Base Project Allocation - $361,000) |
| |||||
18(v) City of Carbondale |
| |||||
19(A) Acquisition, construction, |
| |||||
23Project Allocation | 5,000,000 | |||||
24(Base Project Allocation - $5,000,000) |
| |||||
25(vi) City of Scranton |
| |||||
26(A) Acquisition, construction, |
| |||||
30Project Allocation | 4,000,000 | |||||
1(Base Project Allocation - $4,000,000) |
| |||||
2(B) Acquisition, construction, |
| |||||
6Project Allocation | 3,000,000 | |||||
7(Base Project Allocation - $3,000,000) |
| |||||
8(C) Acquisition, construction, |
| |||||
12Project Allocation | 2,000,000 | |||||
13(Base Project Allocation - $2,000,000) |
| |||||
14(D) Acquisition, construction, |
| |||||
18Project Allocation | 2,500,000 | |||||
19(Base Project Allocation - $2,500,000) |
| |||||
20(E) Acquisition, construction, |
| |||||
24Project Allocation | 5,000,000 | |||||
25(Base Project Allocation - $5,000,000) |
| |||||
26(F) Acquisition, construction, |
| |||||
30Project Allocation | 4,000,000 | |||||
1(Base Project Allocation - $4,000,000) |
| |||||
2(G) Acquisition, construction, |
| |||||
5Project Allocation | 5,000,000 | |||||
6(Base Project Allocation - $5,000,000) |
| |||||
7(H) Acquisition, construction, |
| |||||
11Project Allocation | 5,000,000 | |||||
12(Base Project Allocation - $5,000,000) |
| |||||
13(I) Acquisition, construction, |
| |||||
17Project Allocation | 10,000,000 | |||||
| ||||||
20(J) Acquisition, construction, |
| |||||
26Project Allocation | 3,000,000 | |||||
27(Base Project Allocation - $3,000,000) |
| |||||
28(K) Construction, infrastructure and
1improvement projects |
| |||||
2Project Allocation | 500,000 | |||||
3(Base Project Allocation - $500,000) |
| |||||
4(L) Construction, infrastructure and |
| |||||
7Project Allocation | 2,500,000 | |||||
8(Base Project Allocation - $2,500,000) |
| |||||
9(M) Acquisition, construction, |
| |||||
13Project Allocation | 1,750,000 | |||||
14(Base Project Allocation - $1,750,000) |
| |||||
15(N) Acquisition, construction, |
| |||||
19Project Allocation | 4,500,000 | |||||
20(Base Project Allocation - $4,500,000) |
| |||||
21(O) Construction, infrastructure and |
| |||||
24Project Allocation | 1,500,000 | |||||
25(Base Project Allocation - $1,500,000) |
| |||||
26(P) Construction, infrastructure and |
| |||||
29Project Allocation | 500,000 | |||||
30(Base Project Allocation - $500,000) |
| |||||
1(Q) Construction, infrastructure, |
| |||||
5Project Allocation | 1,000,000 | |||||
6(Base Project Allocation - $1,000,000) |
| |||||
7(R) Construction, infrastructure and |
| |||||
11Project Allocation | 4,000,000 | |||||
12(Base Project Allocation - $4,000,000) |
| |||||
13(S) Acquisition, construction, |
| |||||
18Project Allocation | 3,000,000 | |||||
19(Base Project Allocation - $3,000,000) |
| |||||
20(T) Construction and other related costs |
| |||||
23Project Allocation | 1,500,000 | |||||
24(Base Project Allocation - $1,500,000) |
| |||||
25(U) Construction, infrastructure and |
| |||||
29Project Allocation | 7,500,000 | |||||
30(Base Project Allocation - $7,500,000) |
| |||||
1(V) Construction, infrastructure and |
| |||||
4Project Allocation | 20,000,000 | |||||
| ||||||
7(W) Construction, infrastructure and |
| |||||
11Project Allocation | 3,000,000 | |||||
12(Base Project Allocation - $3,000,000) |
| |||||
13(X) Construction, infrastructure and |
| |||||
18Project Allocation | 3,000,000 | |||||
19(Base Project Allocation - $3,000,000) |
| |||||
20(Y) Construction, infrastructure and |
| |||||
24Project Allocation | 12,500,000 | |||||
| ||||||
27(Z) Acquisition, construction, |
| |||||
1Project Allocation | 2,500,000 | |||||
2(Base Project Allocation - $2,500,000) |
| |||||
3(AA) Acquisition, construction, |
| |||||
6Project Allocation | 10,000,000 | |||||
| ||||||
9(BB) Acquisition, construction, |
| |||||
13Project Allocation | 6,000,000 | |||||
14(Base Project Allocation - $6,000,000) |
| |||||
15(CC) Acquisition, construction, |
| |||||
18Project Allocation | 1,000,000 | |||||
19(Base Project Allocation - $1,000,000) |
| |||||
20(DD) Acquisition, construction, |
| |||||
24Project Allocation | 5,000,000 | |||||
25(Base Project Allocation - $5,000,000) |
| |||||
26(EE) Acquisition, renovations, |
| |||||
1Project Allocation | 2,000,000 | |||||
2(Base Project Allocation - $2,000,000) |
| |||||
3(vi.1) Covington Township |
| |||||
4(A) Construction, infrastructure |
| |||||
7Project Allocation | 500,000 | |||||
8(Base Project Allocation - $500,000) |
| |||||
9(vii) Dickson City |
| |||||
10(A) Acquisition, construction, |
| |||||
14Project Allocation | 2,500,000 | |||||
15(Base Project Allocation - $2,500,000) |
| |||||
16(viii) Jefferson Township |
| |||||
17(A) Construction, infrastructure and |
| |||||
22Project Allocation | 1,000,000 | |||||
23(Base Project Allocation - $1,000,000) |
| |||||
24(ix) Jessup Borough |
| |||||
25(A) Construction, infrastructure and |
| |||||
28Project Allocation | 1,500,000 | |||||
29(Base Project Allocation - $1,500,000) |
| |||||
30(B) Acquisition, construction,
1infrastructure and other costs related |
| |||||
4Project Allocation | 8,000,000 | |||||
5(Base Project Allocation - $8,000,000) |
| |||||
6(x) Laplume Township |
| |||||
7(A) Construction, infrastructure and |
| |||||
11Project Allocation | 3,500,000 | |||||
12(Base Project Allocation - $3,500,000) |
| |||||
13(xi) Mayfield Borough |
| |||||
14(A) Acquisition, construction, |
| |||||
18Project Allocation | 3,000,000 | |||||
19(Base Project Allocation - $3,000,000) |
| |||||
20(xii) Moosic Borough |
| |||||
21(A) Construction, infrastructure |
| |||||
25Project Allocation | 2,000,000 | |||||
26(Base Project Allocation - $2,000,000) |
| |||||
27(B) Acquisition, construction, |
| |||||
1Project Allocation | 2,000,000 | |||||
2(Base Project Allocation - $2,000,000) |
| |||||
3(C) Construction, infrastructure and |
| |||||
6Project Allocation | 1,000,000 | |||||
7(Base Project Allocation - $1,000,000) |
| |||||
8(xiii) Scott Township |
| |||||
9(A) Construction, infrastructure |
| |||||
14Project Allocation | 3,000,000 | |||||
15(Base Project Allocation - $3,000,000) |
| |||||
16(xiii.1) South Abington Township |
| |||||
17(A) Acquisition, development, |
| |||||
21Project Allocation | 2,000,000 | |||||
22(Base Project Allocation - $2,000,000) |
| |||||
23(B) Construction, design, infrastructure |
| |||||
27Project Allocation | 1,000,000 | |||||
28(Base Project Allocation - $1,000,000) |
| |||||
29(C) Acquisition, development,
1and other costs associated with a |
| |||||
4Project Allocation | 20,000,000 | |||||
| ||||||
7(D) Construction, design, infrastructure |
| |||||
11Project Allocation | 2,000,000 | |||||
12(Base Project Allocation - $2,000,000) |
| |||||
13(xiv) Taylor Borough |
| |||||
14(A) Acquisition, construction, |
| |||||
18Project Allocation | 5,000,000 | |||||
19(Base Project Allocation - $5,000,000) |
| |||||
20(B) Acquisition, construction, |
| |||||
24Project Allocation | 5,000,000 | |||||
25(Base Project Allocation - $5,000,000) |
| |||||
26(xv) West Mifflin Borough |
| |||||
27(A) Acquisition, construction,
1Allegheny County Airport |
| |||||
2Project Allocation | 20,000,000 | |||||
| ||||||
5(36) Lancaster County |
| |||||
6(i) County projects |
| |||||
7(A) Infrastructure upgrades, construction |
| |||||
11Project Allocation | 1,500,000 | |||||
12(Base Project Allocation - $1,500,000) |
| |||||
<-13(B) Acquisition, construction, |
| |||||
17Project Allocation | 20,000,000 | |||||
| ||||||
| ||||||
22(A) Acquisition, infrastructure, |
| |||||
27Project Allocation | 7,000,000 | |||||
28(Base Project Allocation - $7,000,000) |
| |||||
29(iii) City of Lancaster |
| |||||
30(A) Acquisition, design, infrastructure,
1construction and other related costs |
| |||||
6Project Allocation | 1,000,000 | |||||
7(Base Project Allocation - $1,000,000) |
| |||||
8(B) Acquisition, design, infrastructure, |
| |||||
14Project Allocation | 5,000,000 | |||||
15(Base Project Allocation - $5,000,000) |
| |||||
16(C) Acquisition, design, infrastructure, |
| |||||
21Project Allocation | 22,000,000 | |||||
| ||||||
24(D) Infrastructure, construction and |
| |||||
30Project Allocation | 22,500,000 | |||||
| ||||||
3(E) Design, infrastructure, construction |
| |||||
8Project Allocation | 2,500,000 | |||||
9(Base Project Allocation - $2,500,000) |
| |||||
<-10(F) Construction, infrastructure, |
| |||||
13Project Allocation | 12,000,000 | |||||
| ||||||
16(G) Acquisition, construction, |
| |||||
20Project Allocation | 8,000,000 | |||||
21(Base Project Allocation - $8,000,000) |
| |||||
22(H) Acquisition, construction, |
| |||||
26Project Allocation | 5,000,000 | |||||
27(Base Project Allocation - $5,000,000) |
| |||||
28(I) Acquisition, construction, |
| |||||
3Project Allocation | 12,000,000 | |||||
| ||||||
6(J) Acquisition, construction, |
| |||||
10Project Allocation | 8,000,000 | |||||
11(Base Project Allocation - $8,000,000) |
| |||||
12(K) Acquisition, construction, |
| |||||
16Project Allocation | 5,000,000 | |||||
17(Base Project Allocation - $5,000,000) |
| |||||
18(L) Acquisition, construction, |
| |||||
22Project Allocation | 10,000,000 | |||||
| ||||||
25(iv) Elizabethtown Borough |
| |||||
26(A) Design, infrastructure, renovations,
1video surveillance cameras, door and |
| |||||
4Project Allocation | 1,000,000 | |||||
5(Base Project Allocation - $1,000,000) |
| |||||
6(B) Site development, infrastructure |
| |||||
10Project Allocation | 3,000,000 | |||||
11(Base Project Allocation - $3,000,000) |
| |||||
12(C) Site development, infrastructure |
| |||||
16Project Allocation | 3,000,000 | |||||
17(Base Project Allocation - $3,000,000) |
| |||||
18(D) Site development, infrastructure |
| |||||
23Project Allocation | 5,000,000 | |||||
24(Base Project Allocation - $5,000,000) |
| |||||
<-25(E) Construction, renovation and other |
| |||||
30Project Allocation | 5,000,000 | |||||
1(Base Project Allocation - $5,000,000) |
| |||||
2(F) Site development, infrastructure |
| |||||
7Project Allocation | 3,000,000 | |||||
8(Base Project Allocation - $3,000,000) |
| |||||
9(G) Construction and other related costs |
| |||||
13Project Allocation | 3,000,000 | |||||
14(Base Project Allocation - $3,000,000) |
| |||||
15(H) Renovations, improvements and other |
| |||||
18Project Allocation | 1,000,000 | |||||
19(Base Project Allocation - $1,000,000) |
| |||||
20(v) Hempfield Township |
| |||||
21(A) Purchase, renovation and other |
| |||||
25Project Allocation | 3,740,000 | |||||
26(Base Project Allocation - $3,740,000) |
| |||||
27(vi) Manheim Township |
| |||||
28(A) Purchase, renovation and other
1persons with intellectual disabilities |
| |||||
2Project Allocation | 3,740,000 | |||||
3(Base Project Allocation - $3,740,000) |
| |||||
4(vii) Marietta Borough |
| |||||
5(A) Acquisition, site preparation, |
| |||||
10Project Allocation | 10,000,000 | |||||
| ||||||
13(viii) Mt. Joy Township |
| |||||
14(A) Purchase, renovation and other |
| |||||
18Project Allocation | 3,740,000 | |||||
19(Base Project Allocation - $3,740,000) |
| |||||
20(v) <-(ix) New Holland Borough |
| |||||
21(A) Acquisition, infrastructure, |
| |||||
25Project Allocation | 3,000,000 | |||||
26(Base Project Allocation - $3,000,000) |
| |||||
<-27(x) Salisbury Township |
| |||||
28(A) Acquisition, construction,
1related to road, highway and parking |
| |||||
5Project Allocation | 20,000,000 | |||||
| ||||||
8(vi) <-(xi) Warwick Township |
| |||||
9(A) Acquisition, infrastructure, |
| |||||
14Project Allocation | 7,000,000 | |||||
15(Base Project Allocation - $7,000,000) |
| |||||
16(37) Lawrence County |
| |||||
17(i) City of New Castle |
| |||||
18(A) Infrastructure, construction and |
| |||||
23Project Allocation | 5,000,000 | |||||
24(Base Project Allocation - $5,000,000) |
| |||||
<-25(B) Acquisition, construction, |
| |||||
29Project Allocation | 5,000,000 | |||||
30(Base Project Allocation - $5,000,000) |
| |||||
1(ii) Shenango Township |
| |||||
2(A) Construction, infrastructure and |
| |||||
5Project Allocation | 7,000,000 | |||||
6(Base Project Allocation - $7,000,000) |
| |||||
7(iii) Union Township |
| |||||
8(A) Acquisition, construction, |
| |||||
12Project Allocation | 10,000,000 | |||||
| ||||||
15(B) Acquisition, construction, |
| |||||
19Project Allocation | 10,000,000 | |||||
| ||||||
22(iv) Wampum and New Beaver Boroughs |
| |||||
23(A) Acquisition, construction, |
| |||||
27Project Allocation | 10,000,000 | |||||
| ||||||
30(38) Lebanon County |
| |||||
1(i) County projects |
| |||||
2(A) Design, engineering, infrastructure |
| |||||
7Project Allocation | 5,000,000 | |||||
8(Base Project Allocation - $5,000,000) |
| |||||
9(B) Acquisition, infrastructure |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $5,000,000) |
| |||||
<-15(ii) City of Lebanon |
| |||||
16(A) Acquisition, construction and other |
| |||||
20Project Allocation | 500,000 | |||||
21(Base Project Allocation - $500,000) |
| |||||
| ||||||
24(A) Acquisition, construction, |
| |||||
28Project Allocation | 5,000,000 | |||||
29(Base Project Allocation - $5,000,000) |
| |||||
<-30(iii) (iv) East Hanover Towship |
| |||||
1(A) Purchase, renovation and other |
| |||||
9Project Allocation | 3,740,000 | |||||
10(Base Project Allocation - $3,740,000) |
| |||||
11(39) Lehigh County |
| |||||
12(i) Catasauqua Borough |
| |||||
13(A) Construction, infrastructure |
| |||||
17Project Allocation | 5,000,000 | |||||
18(Base Project Allocation - $5,000,000) |
| |||||
<-19(B) Acquisition, construction, |
| |||||
23Project Allocation | 5,000,000 | |||||
24(Base Project Allocation - $5,000,000) |
| |||||
25(ii) City of Allentown |
| |||||
26(A) Acquisition, abatement of hazardous |
| |||||
1Project Allocation | 2,500,000 | |||||
2(Base Project Allocation - $2,500,000) |
| |||||
3(B) Infrastructure, rehabilitation, |
| |||||
6Project Allocation | 3,000,000 | |||||
7(Base Project Allocation - $3,000,000) |
| |||||
8(C) Construction, renovation and other |
| |||||
11Project Allocation | 5,000,000 | |||||
12(Base Project Allocation - $5,000,000) |
| |||||
13(D) Acquisition, renovations, abatement |
| |||||
18Project Allocation | 3,500,000 | |||||
19(Base Project Allocation - $3,500,000) |
| |||||
20(E) Land acquisition, infrastructure |
| |||||
25Project Allocation | 2,000,000 | |||||
26(Base Project Allocation - $2,000,000) |
| |||||
27(F) Infrastructure, renovations, |
| |||||
1Project Allocation | 250,000 | |||||
2(Base Project Allocation - $250,000) |
| |||||
3(G) Acquisition, renovations, |
| |||||
7Project Allocation | 2,500,000 | |||||
8(Base Project Allocation - $2,500,000) |
| |||||
9(H) Acquisition, infrastructure, |
| |||||
14Project Allocation | 1,000,000 | |||||
15(Base Project Allocation - $1,000,000) |
| |||||
16(I) Acquisition, infrastructure, |
| |||||
21Project Allocation | 2,500,000 | |||||
22(Base Project Allocation - $2,500,000) |
| |||||
23(J) Acquisition, infrastructure, |
| |||||
29Project Allocation | 5,000,000 | |||||
30(Base Project Allocation - $5,000,000) |
| |||||
<-1(K) Renovation, rehabilitation and other |
| |||||
4Project Allocation | 1,000,000 | |||||
5(Base Project Allocation - $1,000,000) |
| |||||
6(L) Construction, redevelopment, |
| |||||
11Project Allocation | 3,000,000 | |||||
12(Base Project Allocation - $3,000,000) |
| |||||
13(M) Acquisition, construction, |
| |||||
17Project Allocation | 10,000,000 | |||||
| ||||||
20(N) Construction, infrastructure, |
| |||||
25Project Allocation | 500,000 | |||||
26(Base Project Allocation - $500,000) |
| |||||
27(O) Construction, infrastructure, |
| |||||
1Project Allocation | 2,000,000 | |||||
2(Base Project Allocation - $2,000,000) |
| |||||
<-3(P) Acquisition, construction, |
| |||||
7Project Allocation | 5,000,000 | |||||
8(Base Project Allocation - $5,000,000) |
| |||||
9(iii) City of Bethlehem |
| |||||
10(A) Construction, infrastructure |
| |||||
14Project Allocation | 10,000,000 | |||||
| ||||||
<-17(B) Acquisition, construction, |
| |||||
21Project Allocation | 5,000,000 | |||||
22(Base Project Allocation - $5,000,000) |
| |||||
23(iv) Fountain Hill Borough |
| |||||
24(A) Construction, infrastructure |
| |||||
28Project Allocation | 5,000,000 | |||||
29(Base Project Allocation - $5,000,000) |
| |||||
30(B) Construction, infrastructure
1improvements and other costs related |
| |||||
4Project Allocation | 1,000,000 | |||||
5(Base Project Allocation - $1,000,000) |
| |||||
<-6(C) Construction, infrastructure, |
| |||||
9Project Allocation | 750,000 | |||||
10(Base Project Allocation - $750,000) |
| |||||
11(v) Heidelberg Township |
| |||||
12(A) Acquisition, construction, |
| |||||
16Project Allocation | 2,000,000 | |||||
17(Base Project Allocation - $2,000,000) |
| |||||
18(vi) North Whitehall Township |
| |||||
19(A) Construction, infrastructure and |
| |||||
23Project Allocation | 2,000,000 | |||||
24(Base Project Allocation - $2,000,000) |
| |||||
25(vii) Salisbury Township |
| |||||
26(A) Construction, infrastructure and |
| |||||
30Project Allocation | 10,000,000 | |||||
| ||||||
3(viii) South Whitehall Township |
| |||||
4(A) Construction, renovation and other |
| |||||
8Project Allocation | 20,000,000 | |||||
| ||||||
11(B) Construction, renovation and other |
| |||||
15Project Allocation | 5,000,000 | |||||
16(Base Project Allocation - $5,000,000) |
| |||||
17(ix) Upper Macungie Township |
| |||||
18(A) Acquisition, construction, |
| |||||
22Project Allocation | 1,000,000 | |||||
23(Base Project Allocation - $1,000,000) |
| |||||
24(B) Construction, infrastructure and |
| |||||
27Project Allocation | 1,900,000 | |||||
28(Base Project Allocation - $1,900,000) |
| |||||
29(40) Luzerne County |
| |||||
30(i) County projects |
| |||||
1(A) Acquisition, construction, |
| |||||
6Project Allocation | 3,000,000 | |||||
7(Base Project Allocation - $3,000,000) |
| |||||
8(B) For acquisition, construction, |
| |||||
13Project Allocation | 7,500,000 | |||||
14(Base Project Allocation - $7,500,000) |
| |||||
15(C) Land acquisition, infrastructure |
| |||||
24Project Allocation | 20,000,000 | |||||
| ||||||
<-27(D) Acquisition, construction, |
| |||||
1Project Allocation | 10,000,000 | |||||
| ||||||
4(i.1) City of Hazelton |
| |||||
5(A) For the acquisition, construction, |
| |||||
10Project Allocation | 5,000,000 | |||||
11(Base Project Allocation - $5,000,000) |
| |||||
<-12(ii) City of Nanticoke |
| |||||
<-13(A) (B) Land acquisition, infrastructure |
| |||||
19Project Allocation | 4,000,000 | |||||
20(Base Project Allocation - $4,000,000) |
| |||||
<-21(ii) City of Nanticoke |
| |||||
<-22(B) (A) For the acquisition, |
| |||||
27Project Allocation | 5,000,000 | |||||
28(Base Project Allocation - $5,000,000) |
| |||||
29(iii) City of Pittston |
| |||||
30(A) Acquisition, construction,
1infrastructure and other costs related |
| |||||
4Project Allocation | 2,500,000 | |||||
5(Base Project Allocation - $2,500,000) |
| |||||
6(B) For the acquisition, construction, |
| |||||
11Project Allocation | 5,000,000 | |||||
12(Base Project Allocation - $5,000,000) |
| |||||
<-13(C) Construction, infrastructure and |
| |||||
16Project Allocation | 500,000 | |||||
17(Base Project Allocation - $500,000) |
| |||||
18(iv) City of Wilkes-Barre |
| |||||
19(A) Acquisition, construction, |
| |||||
23Project Allocation | 5,000,000 | |||||
24(Base Project Allocation - $5,000,000) |
| |||||
25(B) Construction, infrastructure |
| |||||
29Project Allocation | 5,000,000 | |||||
30(Base Project Allocation - $5,000,000) |
| |||||
1(C) For the acquisition, construction, |
| |||||
6Project Allocation | 5,000,000 | |||||
7(Base Project Allocation - $5,000,000) |
| |||||
<-8(D) Acquisition, construction, |
| |||||
13Project Allocation | 1,500,000 | |||||
14(Base Project Allocation - $1,500,000) |
| |||||
15(v) Dupont Borough |
| |||||
16(A) Acquisition, construction, |
| |||||
20Project Allocation | 2,000,000 | |||||
21(Base Project Allocation - $2,000,000) |
| |||||
22(vi) Plains Township |
| |||||
23(A) Construction, infrastructure |
| |||||
26Project Allocation | 6,000,000 | |||||
27(Base Project Allocation - $6,000,000) |
| |||||
28(41) Lycoming County |
| |||||
29(i) County projects |
| |||||
30(A) Construction, rehabilitation and
1other related costs to serve NuWeld |
| |||||
3Project Allocation | 1,000,000 | |||||
4(Base Project Allocation - $1,000,000) |
| |||||
5(B) Construction, demolition and other |
| |||||
8Project Allocation | 3,000,000 | |||||
9(Base Project Allocation - $3,000,000) |
| |||||
10(C) Design and construction of facility |
| |||||
15Project Allocation | 3,676,000 | |||||
16(Base Project Allocation - $3,676,000) |
| |||||
17(D) Acquisition, rehabilitation, |
| |||||
21Project Allocation | 20,000,000 | |||||
| ||||||
24(E) Acquisition, infrastructure, |
| |||||
28Project Allocation | 10,000,000 | |||||
| ||||||
1(F) Acquisition, infrastructure, |
| |||||
4Project Allocation | 2,000,000 | |||||
5(Base Project Allocation - $2,000,000) |
| |||||
6(G) Acquisition, construction, |
| |||||
12Project Allocation | 10,000,000 | |||||
| ||||||
<-15(H) Acquisition, construction, |
| |||||
19Project Allocation | 20,000,000 | |||||
| ||||||
<-22(I) Acquisition, construction, facility |
| |||||
26Project Allocation | 2,500,000 | |||||
27(Base Project Allocation - $2,500,000) |
| |||||
28(i.1) City of Williamsport |
| |||||
29(A) Construction, infrastructure and
1center |
| |||||
2Project Allocation | 5,000,000 | |||||
3(Base Project Allocation - $5,000,000) |
| |||||
4(B) Construction, infrastructure, |
| |||||
8Project Allocation | 2,255,000 | |||||
9(Base Project Allocation - $2,255,000) |
| |||||
10(C) Construction, infrastructure and |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $5,000,000) |
| |||||
15(ii) Muncy Township |
| |||||
16(A) Acquisition, site preparation, |
| |||||
21Project Allocation | 2,000,000 | |||||
22(Base Project Allocation - $2,000,000) |
| |||||
23(42) McKean County |
| |||||
24(i) County projects |
| |||||
25(A) Acquisition, infrastructure, |
| |||||
28Project Allocation | 10,000,000 | |||||
| ||||||
1(ii) City of Bradford |
| |||||
2(A) Land acquisition, demolition, site |
| |||||
12Project Allocation | 10,000,000 | |||||
| ||||||
<-15(B) Renovation, construction and other |
| |||||
20Project Allocation | 1,000,000 | |||||
21(Base Project Allocation - $1,000,000) |
| |||||
22(iii) Foster Township |
| |||||
23(A) Construction, site work, |
| |||||
29Project Allocation | 10,000,000 | |||||
30(Base Project Allocation -
1$10,000,000) |
| |||||
2(43) Mercer County |
| |||||
3(i) County projects |
| |||||
4(A) Infrastructure, construction and |
| |||||
7Project Allocation | 400,000 | |||||
8(Base Project Allocation - $400,000) |
| |||||
9(B) Infrastructure and other related |
| |||||
12Project Allocation | 1,000,000 | |||||
13(Base Project Allocation - $1,000,000) |
| |||||
14(C) Acquisition, infrastructure, |
| |||||
19Project Allocation | 1,500,000 | |||||
20(Base Project Allocation - $1,500,000) |
| |||||
21(D) Acquisition, rehabilitation, |
| |||||
25Project Allocation | 2,225,000 | |||||
26(Base Project Allocation - $2,225,000) |
| |||||
<-27(E) Acquisition, construction, |
| |||||
30Project Allocation | 7,500,000 | |||||
1(Base Project Allocation - $7,500,000) |
| |||||
2(F) Construction, infrastructure and |
| |||||
5Project Allocation | 2,225,000 | |||||
6(Base Project Allocation - $2,225,000) |
| |||||
7(G) Acquisition, construction, |
| |||||
11Project Allocation | 2,000,000 | |||||
12(Base Project Allocation - $2,000,000) |
| |||||
13(H) Acquisition, construction, |
| |||||
18Project Allocation | 2,000,000 | |||||
19(Base Project Allocation - $2,000,000) |
| |||||
20(I) Acquisition, construction, |
| |||||
23Project Allocation | 5,000,000 | |||||
24(Base Project Allocation - $5,000,000) |
| |||||
| ||||||
27(A) Acquisition, rehabilitation, |
| |||||
1Project Allocation | 3,000,000 | |||||
2(Base Project Allocation - $3,000,000) |
| |||||
3(B) Renovation and rehabilitation of |
| |||||
7Project Allocation | 1,000,000 | |||||
8(Base Project Allocation - $1,000,000) |
| |||||
9(iii) City of Farrell |
| |||||
10(A) Acquisition, construction, |
| |||||
14Project Allocation | 2,000,000 | |||||
15(Base Project Allocation - $2,000,000) |
| |||||
16(iii) <-(iv) City of Hermitage |
| |||||
17(A) Acquisition, construction, renovation |
| |||||
20Project Allocation | 2,000,000 | |||||
21(Base Project Allocation - $2,000,000) |
| |||||
22(B) Acquisition, construction and |
| |||||
25Project Allocation | 3,000,000 | |||||
26(Base Project Allocation - $3,000,000) |
| |||||
<-27(C) Acquisition, construction and other |
| |||||
29Project Allocation | 1,500,000 | |||||
30(Base Project Allocation - $1,500,000) |
| |||||
1(D) Acquisition, construction, |
| |||||
4Project Allocation | 3,000,000 | |||||
5(Base Project Allocation - $3,000,000) |
| |||||
6(E) Acquisition, construction, |
| |||||
9Project Allocation | 2,000,000 | |||||
10(Base Project Allocation - $2,000,000) |
| |||||
11(v) City of Sharon |
| |||||
12(A) Construction, infrastructure, |
| |||||
15Project Allocation | 3,000,000 | |||||
16(Base Project Allocation - $3,000,000) |
| |||||
17(B) Acquisition, construction, |
| |||||
21Project Allocation | 500,000 | |||||
22(Base Project Allocation - $500,000) |
| |||||
23(44) Mifflin County |
| |||||
24(i) County projects |
| |||||
25(A) Acquisition, construction, |
| |||||
29Project Allocation | 3,000,000 | |||||
30(Base Project Allocation - $3,000,000) |
| |||||
| ||||||
3(A) Acquisition, construction, |
| |||||
9Project Allocation | 600,000 | |||||
10(Base Project Allocation - $600,000) |
| |||||
11(B) Acquisition, construction and other |
| |||||
15Project Allocation | 1,000,000 | |||||
16(Base Project Allocation - $1,000,000) |
| |||||
17(C) Demolition, remediation, renovations |
| |||||
22Project Allocation | 1,250,000 | |||||
23(Base Project Allocation - $1,250,000) |
| |||||
24(D) Construction, renovation, |
| |||||
29Project Allocation | 3,000,000 | |||||
30(Base Project Allocation - $3,000,000) |
| |||||
1(45) Monroe County |
| |||||
2(i) Barrett Township |
| |||||
3(A) Construction, infrastructure |
| |||||
6Project Allocation | 1,000,000 | |||||
7(Base Project Allocation - $1,000,000) |
| |||||
8(ii) Bartonsville |
| |||||
9(A) Land acquisition, construction, |
| |||||
13Project Allocation | 20,000,000 | |||||
| ||||||
<-16(iii) Coolbaugh and Tobyhanna Townships |
| |||||
17(A) Construction, infrastructure and |
| |||||
23Project Allocation | 5,000,000 | |||||
24(Base Project Allocation - $5,000,000) |
| |||||
25(iv) Pocono Township |
| |||||
26(A) Construction, infrastructure and |
| |||||
30Project Allocation | 5,000,000 | |||||
1(Base Project Allocation - $5,000,000) |
| |||||
2(46) Montgomery County |
| |||||
3(i) County projects |
| |||||
4(A) Acquisition, infrastructure, |
| |||||
8Project Allocation | 2,500,000 | |||||
9(Base Project Allocation - $2,500,000) |
| |||||
<-10(B) Rehabilitation of railroad, including |
| |||||
19Project Allocation | 10,000,000 | |||||
| ||||||
| ||||||
24(A) Acquisition, infrastructure, |
| |||||
29Project Allocation | 1,000,000 | |||||
30(Base Project Allocation - $1,000,000) |
| |||||
1(B) Acquisition, infrastructure, |
| |||||
6Project Allocation | 1,000,000 | |||||
7(Base Project Allocation - $1,000,000) |
| |||||
8(C) Acquisition, infrastructure, |
| |||||
13Project Allocation | 3,000,000 | |||||
14(Base Project Allocation - $3,000,000) |
| |||||
15(D) Site preparation, infrastructure, |
| |||||
21Project Allocation | 4,000,000 | |||||
22(Base Project Allocation - $4,000,000) |
| |||||
<-23(ii.1) Abington Township |
| |||||
24(A) Construction and other related costs |
| |||||
26Project Allocation | 1,000,000 | |||||
27(Base Project Allocation - $1,000,000) |
| |||||
28(B) Construction and other related costs |
| |||||
1Project Allocation | 1,000,000 | |||||
2(Base Project Allocation - $1,000,000) |
| |||||
3(C) Construction and other related costs |
| |||||
5Project Allocation | 2,188,000 | |||||
6(Base Project Allocation - $2,188,000) |
| |||||
7(ii.2) Borough of Ambler |
| |||||
8(A) Infrastructure, redevelopment, |
| |||||
12Project Allocation | 1,700,000 | |||||
13(Base Project Allocation - $1,700,000) |
| |||||
14(iii) Borough of Hatboro |
| |||||
15(A) Infrastructure, construction and |
| |||||
21Project Allocation | 1,500,000 | |||||
22(Base Project Allocation - $1,500,000) |
| |||||
<-23(B) Acquisition, infrastructure, |
| |||||
26Project Allocation | 2,500,000 | |||||
27(Base Project Allocation - $2,500,000) |
| |||||
28(iv) Cheltenham Township |
| |||||
29(A) Construction, infrastructure
1of sanitary sewer system, and other |
| |||||
3Project Allocation | 6,000,000 | |||||
4(Base Project Allocation - $6,000,000) |
| |||||
5(B) Construction, infrastructure |
| |||||
8Project Allocation | 1,750,000 | |||||
9(Base Project Allocation - $1,750,000) |
| |||||
10(C) Construction, infrastructure |
| |||||
14Project Allocation | 3,000,000 | |||||
15(Base Project Allocation - $3,000,000) |
| |||||
16(D) Acquisition, infrastructure, |
| |||||
20Project Allocation | 7,500,000 | |||||
21(Base Project Allocation - $7,500,000) |
| |||||
<-22(E) Construction and other related costs |
| |||||
24Project Allocation | 225,000 | |||||
25(Base Project Allocation - $225,000) |
| |||||
26(F) Acquisition, construction, |
| |||||
29Project Allocation | 7,500,000 | |||||
30(Base Project Allocation - $7,500,000) |
| |||||
1(G) Construction, infrastructure and |
| |||||
5Project Allocation | 1,650,000 | |||||
6(Base Project Allocation - $1,650,000) |
| |||||
7(H) Construction, infrastructure and |
| |||||
10Project Allocation | 875,000 | |||||
11(Base Project Allocation - $875,000) |
| |||||
12(I) Construction, infrastructure and |
| |||||
15Project Allocation | 6,000,000 | |||||
16(Base Project Allocation - $6,000,000) |
| |||||
17(J) Construction and other related costs |
| |||||
20Project Allocation | 742,000 | |||||
21(Base Project Allocation - $742,000) |
| |||||
22(K) Acquisition, construction and other |
| |||||
26Project Allocation | 7,500,000 | |||||
27(Base Project Allocation - $7,500,000) |
| |||||
28(L) Acquisition, construction,
1project |
| |||||
2Project Allocation | 8,000,000 | |||||
3(Base Project Allocation - $8,000,000) |
| |||||
4(M) Construction, infrastructure and |
| |||||
9Project Allocation | 3,000,000 | |||||
10(Base Project Allocation - $3,000,000) |
| |||||
11(N) Construction, infrastructure and |
| |||||
14Project Allocation | 1,000,000 | |||||
15(Base Project Allocation - $1,000,000) |
| |||||
16(v) Conshohocken Borough |
| |||||
17(A) Construction, infrastructure |
| |||||
21Project Allocation | 4,391,000 | |||||
22(Base Project Allocation - $4,391,000) |
| |||||
23(B) Construction, infrastructure |
| |||||
27Project Allocation | 5,000,000 | |||||
28(Base Project Allocation - $5,000,000) |
| |||||
<-29(C) Construction, infrastructure,
1materials and other related costs for |
| |||||
4Project Allocation | 3,821,000 | |||||
5(Base Project Allocation - $3,821,000) |
| |||||
6(vi) East Norriton Township |
| |||||
7(A) Construction, infrastructure |
| |||||
10Project Allocation | 2,000,000 | |||||
11(Base Project Allocation - $2,000,000) |
| |||||
12(vii) Lower Gwynedd Township |
| |||||
13(A) Acquisition, infrastructure, |
| |||||
18Project Allocation | 500,000 | |||||
19(Base Project Allocation - $500,000) |
| |||||
20(viii) Lower Merion Township |
| |||||
21(A) Construction, infrastructure |
| |||||
26Project Allocation | 10,000,000 | |||||
| ||||||
29(B) Construction, infrastructure |
| |||||
3Project Allocation | 5,000,000 | |||||
4(Base Project Allocation - $5,000,000) |
| |||||
5(ix) Lower Providence Township |
| |||||
6(A) Infrastructure, construction and |
| |||||
12Project Allocation | 2,500,000 | |||||
13(Base Project Allocation - $2,500,000) |
| |||||
14(x) Montgomery Township |
| |||||
15(A) Infrastructure, redevelopment and |
| |||||
18Project Allocation | 5,000,000 | |||||
19(Base Project Allocation - $5,000,000) |
| |||||
20(xi) Norristown Borough |
| |||||
21(A) Construction, infrastructure |
| |||||
25Project Allocation | 1,500,000 | |||||
26(Base Project Allocation - $1,500,000) |
| |||||
27(B) Construction, infrastructure |
| |||||
1Project Allocation | 750,000 | |||||
2(Base Project Allocation - $750,000) |
| |||||
<-3(C) Construction, infrastructure, |
| |||||
7Project Allocation | 5,000,000 | |||||
8(Base Project Allocation - $5,000,000) |
| |||||
9(D) Acquisition, construction, |
| |||||
13Project Allocation | 2,500,000 | |||||
14(Base Project Allocation - $2,500,000) |
| |||||
15(xi.1) Plymouth Township |
| |||||
16(A) Construction, infrastructure |
| |||||
20Project Allocation | 300,000 | |||||
21(Base Project Allocation - $300,000) |
| |||||
22(xii) Springfield Township |
| |||||
23(A) Construction, infrastructure |
| |||||
27Project Allocation | 2,500,000 | |||||
28(Base Project Allocation - $2,500,000) |
| |||||
29(xiii) Upper Dublin Township |
| |||||
30(A) Acquisition, renovation,
1infrastructure development, site |
| |||||
6Project Allocation | 10,000,000 | |||||
| ||||||
9(xiv) Upper Merion Township |
| |||||
10(A) Construction, infrastructure |
| |||||
13Project Allocation | 3,000,000 | |||||
14(Base Project Allocation - $3,000,000) |
| |||||
<-15(B) Construction and other related costs |
| |||||
17Project Allocation | 900,000 | |||||
18(Base Project Allocation - $900,000) |
| |||||
19(C) Construction, infrastructure, |
| |||||
22Project Allocation | 3,000,000 | |||||
23(Base Project Allocation - $3,000,000) |
| |||||
<-24(D) Construction, infrastructure, |
| |||||
29Project Allocation | 3,000,000 | |||||
30(Base Project Allocation - $3,000,000) |
| |||||
1(xv) Upper Moreland Township |
| |||||
2(A) Construction, infrastructure |
| |||||
9Project Allocation | 500,000 | |||||
10(Base Project Allocation - $500,000) |
| |||||
<-11(xvi) Upper Providence Township |
| |||||
12(A) Construction, infrastructure and |
| |||||
16Project Allocation | 500,000 | |||||
17(Base Project Allocation - $500,000) |
| |||||
18(xvi) <-(xvii) Whitemarsh Township |
| |||||
19(A) Construction, infrastructure |
| |||||
24Project Allocation | 3,500,000 | |||||
25(Base Project Allocation - $3,500,000) |
| |||||
<-26(xviii) Whitpain Township |
| |||||
27(A) Construction, infrastructure and |
| |||||
1Project Allocation | 1,500,000 | |||||
2(Base Project Allocation - $1,500,000) |
| |||||
3(47) Montour County |
| |||||
4(i) (Reserved) |
| |||||
5(48) Northampton County |
| |||||
6(i) County projects |
| |||||
7(A) Acquisition, construction, |
| |||||
11Project Allocation | 8,000,000 | |||||
12(Base Project Allocation - $8,000,000) |
| |||||
13(B) Acquisition, construction, |
| |||||
17Project Allocation | 2,000,000 | |||||
18(Base Project Allocation - $2,000,000) |
| |||||
19(C) Acquisition, construction, |
| |||||
22Project Allocation | 5,000,000 | |||||
23(Base Project Allocation - $5,000,000) |
| |||||
24(ii) Bethlehem Township |
| |||||
25(A) Construction, renovation and other |
| |||||
29Project Allocation | 20,000,000 | |||||
30(Base Project Allocation -
1$20,000,000) |
| |||||
2(B) Site development and infrastructure |
| |||||
5Project Allocation | 500,000 | |||||
6(Base Project Allocation - $500,000) |
| |||||
7(iii) City of Bethlehem |
| |||||
8(A) Construction, renovation, |
| |||||
11Project Allocation | 1,000,000 | |||||
12(Base Project Allocation - $1,000,000) |
| |||||
13(B) Acquisition, construction, |
| |||||
18Project Allocation | 25,000,000 | |||||
| ||||||
<-21(C) Construction and other related costs |
| |||||
23Project Allocation | 10,000,000 | |||||
| ||||||
26(D) Construction and other related costs |
| |||||
28Project Allocation | 10,000,000 | |||||
| ||||||
1(iv) City of Easton |
| |||||
2(A) Acquisition, construction, |
| |||||
6Project Allocation | 5,000,000 | |||||
7(Base Project Allocation - $5,000,000) |
| |||||
8(B) Acquisition, construction, |
| |||||
13Project Allocation | 3,000,000 | |||||
14(Base Project Allocation - $3,000,000) |
| |||||
15(C) Acquisition, construction, |
| |||||
21Project Allocation | 10,000,000 | |||||
| ||||||
24(D) Construction, infrastructure and |
| |||||
29Project Allocation | 1,156,000 | |||||
30(Base Project Allocation - $1,156,000) |
| |||||
1(E) Acquisition, construction, |
| |||||
4Project Allocation | 2,000,000 | |||||
5(Base Project Allocation - $2,000,000) |
| |||||
6(F) Acquisition and redevelopment of the |
| |||||
8Project Allocation | 5,000,000 | |||||
9(Base Project Allocation - $5,000,000) |
| |||||
<-10(G) Acquisition, construction, |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $5,000,000) |
| |||||
15(H) Construction, redevelopment and other |
| |||||
18Project Allocation | 2,000,000 | |||||
19(Base Project Allocation - $2,000,000) |
| |||||
20(I) Acquisition, construction and other |
| |||||
23Project Allocation | 3,000,000 | |||||
24(Base Project Allocation - $3,000,000) |
| |||||
25(J) Acquisition, construction and other |
| |||||
28Project Allocation | 10,000,000 | |||||
| ||||||
1(v) East Allen Township |
| |||||
2(A) Infrastructure and related site costs |
| |||||
5Project Allocation | 600,000 | |||||
6(Base Project Allocation - $600,000) |
| |||||
<-7(B) Acquisition, construction, |
| |||||
10Project Allocation | 785,000 | |||||
11(Base Project Allocation - $785,000) |
| |||||
12(C) Renovation and rehabilitation of |
| |||||
16Project Allocation | 2,000,000 | |||||
17(Base Project Allocation - $2,000,000) |
| |||||
18(D) Land acquisition, construction and |
| |||||
21Project Allocation | 785,000 | |||||
22(Base Project Allocation - $785,000) |
| |||||
23(vi) East Bangor Borough |
| |||||
24(A) Construction, infrastructure and |
| |||||
28Project Allocation | 150,000 | |||||
29(Base Project Allocation - $150,000) |
| |||||
<-30(vi.1) Freemansburg Borough |
| |||||
1(A) Construction, infrastructure and |
| |||||
5Project Allocation | 1,800,000 | |||||
6(Base Project Allocation - $1,800,000) |
| |||||
7(vii) Hellertown Borough |
| |||||
8(A) Acquisition, construction, |
| |||||
12Project Allocation | 2,500,000 | |||||
13(Base Project Allocation - $2,500,000) |
| |||||
14(viii) Lower Nazareth |
| |||||
15(A) Acquisition, construction, |
| |||||
18Project Allocation | 10,000,000 | |||||
| ||||||
21(ix) Portland Borough |
| |||||
22(A) Acquisition of land and construction |
| |||||
25Project Allocation | 4,500,000 | |||||
26(Base Project Allocation - $4,500,000) |
| |||||
27(x) Upper Mt. Bethel Township |
| |||||
28(A) Acquisition, construction, |
| |||||
1Project Allocation | 10,000,000 | |||||
| ||||||
4(B) Acquisition of land and construction |
| |||||
7Project Allocation | 4,500,000 | |||||
8(Base Project Allocation - $4,500,000) |
| |||||
9(49) Northumberland County |
| |||||
10(i) County projects |
| |||||
11(A) Redevelopment and other costs related |
| |||||
15Project Allocation | 5,000,000 | |||||
16(Base Project Allocation - $5,000,000) |
| |||||
17(ii) Northumberland County Industrial |
| |||||
19(A) Infrastructure, renovation, |
| |||||
23Project Allocation | 3,000,000 | |||||
24(Base Project Allocation - $3,000,000) |
| |||||
25(iii) Ci<-ty of Sunbury |
| |||||
26(A) Acquisition, construction, |
| |||||
1Project Allocation | 4,000,000 | |||||
2(Base Project Allocation - $4,000,000) |
| |||||
3(50) Perry County |
| |||||
4(i) (Reserved) |
| |||||
5(51) Philadelphia County |
| |||||
6(i) County projects |
| |||||
7(A) Renovation of biology labs and |
| |||||
11Project Allocation | 2,000,000 | |||||
12(Base Project Allocation - $2,000,000) |
| |||||
13(B) Land acquisition, construction, |
| |||||
17Project Allocation | 15,000,000 | |||||
| ||||||
20(C) Construction, infrastructure |
| |||||
23Project Allocation | 50,000,000 | |||||
| ||||||
<-26(D) Infrastructure in support of downtown |
| |||||
1Project Allocation | 30,000,000 | |||||
| ||||||
4(E) Acquisition, construction, |
| |||||
13Project Allocation | 20,000,000 | |||||
| ||||||
16(F) Acquisition, construction, |
| |||||
25Project Allocation | 20,000,000 | |||||
| ||||||
28(G) Acquisition, construction,
1improvements, including improvements |
| |||||
7Project Allocation | 20,000,000 | |||||
| ||||||
10(H) Acquisition, construction, |
| |||||
19Project Allocation | 20,000,000 | |||||
| ||||||
22(I) Acquisition, construction, |
| |||||
1Project Allocation | 20,000,000 | |||||
| ||||||
4(ii) City of Philadelphia |
| |||||
5(A) Construction, infrastructure, |
| |||||
9Project Allocation | 4,000,000 | |||||
10(Base Project Allocation - $4,000,000) |
| |||||
11(B) Construction and other related costs |
| |||||
14Project Allocation | 1,000,000 | |||||
15(Base Project Allocation - $1,000,000) |
| |||||
16(C) Construction, infrastructure and |
| |||||
19Project Allocation | 35,000,000 | |||||
| ||||||
22(D) Construction, infrastructure and |
| |||||
25Project Allocation | 3,500,000 | |||||
26(Base Project Allocation - $3,500,000) |
| |||||
27(E) Construction, infrastructure and |
| |||||
30Project Allocation | 55,000,000 | |||||
| ||||||
3(F) For building, gallery, exhibit and |
| |||||
8Project Allocation | 25,000,000 | |||||
| ||||||
11(G) Construction, infrastructure and |
| |||||
14Project Allocation | 3,125,000 | |||||
15(Base Project Allocation - $3,125,000) |
| |||||
16(H) Construction, infrastructure and |
| |||||
20Project Allocation | 500,000 | |||||
21(Base Project Allocation - $500,000) |
| |||||
22(I) Construction, infrastructure and |
| |||||
25Project Allocation | 30,000,000 | |||||
| ||||||
28(J) Construction, infrastructure and |
| |||||
1Project Allocation | 5,000,000 | |||||
2(Base Project Allocation - $5,000,000) |
| |||||
3(K) Construction, infrastructure and |
| |||||
6Project Allocation | 3,000,000 | |||||
7(Base Project Allocation - $3,000,000) |
| |||||
8(L) Construction, infrastructure and |
| |||||
11Project Allocation | 500,000 | |||||
12(Base Project Allocation - $500,000) |
| |||||
13(M) Construction, infrastructure and |
| |||||
16Project Allocation | 1,000,000 | |||||
17(Base Project Allocation - $1,000,000) |
| |||||
18(N) Acquisition, construction, |
| |||||
23Project Allocation | 8,000,000 | |||||
24(Base Project Allocation - $8,000,000) |
| |||||
25(O) Construction, infrastructure and |
| |||||
28Project Allocation | 7,500,000 | |||||
29(Base Project Allocation - $7,500,000) |
| |||||
30(P) Redevelopment, construction,
1infrastructure and other costs related |
| |||||
4Project Allocation | 1,250,000 | |||||
5(Base Project Allocation - $1,250,000) |
| |||||
6(Q) Redevelopment, construction, |
| |||||
9Project Allocation | 5,000,000 | |||||
10(Base Project Allocation - $5,000,000) |
| |||||
11(R) Redevelopment, construction, |
| |||||
15Project Allocation | 30,000,000 | |||||
| ||||||
18(S) Facilities construction, |
| |||||
22Project Allocation | 10,000,000 | |||||
| ||||||
25(T) Facilities construction, |
| |||||
29Project Allocation | 10,000,000 | |||||
30(Base Project Allocation -
1$10,000,000) |
| |||||
2(U) Construction, infrastructure and |
| |||||
5Project Allocation | 1,750,000 | |||||
6(Base Project Allocation - $1,750,000) |
| |||||
7(V) Acquisition, construction, |
| |||||
10Project Allocation | 3,500,000 | |||||
11(Base Project Allocation - $3,500,000) |
| |||||
12(W) Construction, infrastructure and |
| |||||
15Project Allocation | 2,500,000 | |||||
16(Base Project Allocation - $2,500,000) |
| |||||
17(X) Construction, infrastructure and |
| |||||
21Project Allocation | 5,000,000 | |||||
22(Base Project Allocation - $5,000,000) |
| |||||
23(Y) Construction, demolition, |
| |||||
28Project Allocation | 20,000,000 | |||||
| ||||||
1(Z) Acquisition, construction, |
| |||||
6Project Allocation | 5,000,000 | |||||
7(Base Project Allocation - $5,000,000) |
| |||||
8(AA) Acquisition, construction, |
| |||||
13Project Allocation | 3,000,000 | |||||
14(Base Project Allocation - $3,000,000) |
| |||||
15(BB) Construction, infrastructure and |
| |||||
18Project Allocation | 5,000,000 | |||||
19(Base Project Allocation - $5,000,000) |
| |||||
20(CC) Construction, infrastructure, |
| |||||
23Project Allocation | 1,500,000 | |||||
24(Base Project Allocation - $1,500,000) |
| |||||
25(DD) Acquisition, clearing, demolition,
1University |
| |||||
2Project Allocation | 30,000,000 | |||||
| ||||||
5(EE) Construction, infrastructure, |
| |||||
8Project Allocation | 4,500,000 | |||||
9(Base Project Allocation - $4,500,000) |
| |||||
10(FF) Construction, infrastructure, |
| |||||
15Project Allocation | 7,500,000 | |||||
16(Base Project Allocation - $7,500,000) |
| |||||
17(GG) Infrastructure improvements, |
| |||||
20Project Allocation | 1,000,000 | |||||
21(Base Project Allocation - $1,000,000) |
| |||||
22(HH) Construction, infrastructure, |
| |||||
25Project Allocation | 5,000,000 | |||||
26(Base Project Allocation - $5,000,000) |
| |||||
27(II) Construction, infrastructure,
1ARSENAL |
| |||||
2Project Allocation | 2,500,000 | |||||
3(Base Project Allocation - $2,500,000) |
| |||||
4(JJ) Construction, infrastructure and |
| |||||
9Project Allocation | 5,000,000 | |||||
10(Base Project Allocation - $5,000,000) |
| |||||
11(KK) Construction, infrastructure, |
| |||||
15Project Allocation | 8,000,000 | |||||
16(Base Project Allocation - $8,000,000) |
| |||||
17(LL) Construction, infrastructure and |
| |||||
21Project Allocation | 8,000,000 | |||||
22(Base Project Allocation - $8,000,000) |
| |||||
23(MM) Construction, infrastructure and |
| |||||
27Project Allocation | 3,000,000 | |||||
28(Base Project Allocation - $3,000,000) |
| |||||
29(NN) Construction, infrastructure,
1Chase Cancer Center Laboratory |
| |||||
4Project Allocation | 7,000,000 | |||||
5(Base Project Allocation - $7,000,000) |
| |||||
6(OO) Construction, infrastructure, |
| |||||
9Project Allocation | 1,500,000 | |||||
10(Base Project Allocation - $1,500,000) |
| |||||
11(PP) Construction, infrastructure, |
| |||||
15Project Allocation | 4,000,000 | |||||
16(Base Project Allocation - $4,000,000) |
| |||||
17(QQ) Demolition, acquisition, |
| |||||
21Project Allocation | 35,000,000 | |||||
| ||||||
24(RR) Construction, infrastructure, |
| |||||
28Project Allocation | 500,000 | |||||
29(Base Project Allocation - $500,000) |
| |||||
30(SS) Acquisition, construction,
1infrastructure improvements and other |
| |||||
5Project Allocation | 1,500,000 | |||||
6(Base Project Allocation - $1,500,000) |
| |||||
7(TT) Acquisition, construction, |
| |||||
11Project Allocation | 750,000 | |||||
12(Base Project Allocation - $750,000) |
| |||||
13(UU) Acquisition, construction, |
| |||||
19Project Allocation | 2,500,000 | |||||
20(Base Project Allocation - $2,500,000) |
| |||||
21(VV) Construction, infrastructure and |
| |||||
25Project Allocation | 500,000 | |||||
26(Base Project Allocation - $500,000) |
| |||||
27(WW) Construction, infrastructure and |
| |||||
1Project Allocation | 2,000,000 | |||||
2(Base Project Allocation - $2,000,000) |
| |||||
3(XX) Acquisition, construction, |
| |||||
7Project Allocation | 1,000,000 | |||||
8(Base Project Allocation - $1,000,000) |
| |||||
9(YY) Construction, infrastructure and |
| |||||
13Project Allocation | 6,000,000 | |||||
14(Base Project Allocation - $6,000,000) |
| |||||
15(ZZ) Construction, infrastructure and |
| |||||
19Project Allocation | 1,500,000 | |||||
20(Base Project Allocation - $1,500,000) |
| |||||
21(AAA) Construction, infrastructure and |
| |||||
25Project Allocation | 1,600,000 | |||||
26(Base Project Allocation - $1,600,000) |
| |||||
27(BBB) Construction, infrastructure and |
| |||||
1Project Allocation | 700,000 | |||||
2(Base Project Allocation - $700,000) |
| |||||
3(CCC) Acquisition, infrastructure, |
| |||||
7Project Allocation | 10,000,000 | |||||
| ||||||
10(DDD) Acquisition, infrastructure, |
| |||||
14Project Allocation | 1,500,000 | |||||
15(Base Project Allocation - $1,500,000) |
| |||||
16(EEE) Construction, infrastructure and |
| |||||
21Project Allocation | 15,000,000 | |||||
| ||||||
24(FFF) Construction, infrastructure and |
| |||||
28Project Allocation | 1,500,000 | |||||
29(Base Project Allocation - $1,500,000) |
| |||||
30(GGG) Construction, infrastructure and
1other costs related to Wynne Ballroom |
| |||||
4Project Allocation | 200,000 | |||||
5(Base Project Allocation - $200,000) |
| |||||
6(HHH) Construction, infrastructure and |
| |||||
10Project Allocation | 500,000 | |||||
11(Base Project Allocation - $500,000) |
| |||||
12(III) Construction, infrastructure and |
| |||||
15Project Allocation | 750,000 | |||||
16(Base Project Allocation - $750,000) |
| |||||
17(JJJ) Acquisition, infrastructure, |
| |||||
21Project Allocation | 3,000,000 | |||||
22(Base Project Allocation - $3,000,000) |
| |||||
23(KKK) Acquisition, infrastructure, |
| |||||
28Project Allocation | 3,000,000 | |||||
29(Base Project Allocation - $3,000,000) |
| |||||
30(LLL) Construction, infrastructure and
1other costs related to revitalization |
| |||||
3Project Allocation | 500,000 | |||||
4(Base Project Allocation - $500,000) |
| |||||
5(MMM) Acquisition, infrastructure, |
| |||||
11Project Allocation | 4,000,000 | |||||
12(Base Project Allocation - $4,000,000) |
| |||||
13(NNN) Construction, infrastructure and |
| |||||
18Project Allocation | 10,000,000 | |||||
| ||||||
21(OOO) Construction, infrastructure and |
| |||||
26Project Allocation | 2,300,000 | |||||
27(Base Project Allocation - $2,300,000) |
| |||||
28(PPP) Construction, infrastructure and
1Senior Community Center |
| |||||
2Project Allocation | 1,000,000 | |||||
3(Base Project Allocation - $1,000,000) |
| |||||
4(QQQ) Acquisition, construction, |
| |||||
8Project Allocation | 3,000,000 | |||||
9(Base Project Allocation - $3,000,000) |
| |||||
10(RRR) Construction, infrastructure and |
| |||||
14Project Allocation | 5,000,000 | |||||
15(Base Project Allocation - $5,000,000) |
| |||||
16(SSS) Acquisition, construction, |
| |||||
20Project Allocation | 40,000,000 | |||||
| ||||||
23(TTT) Acquisition, construction, |
| |||||
28Project Allocation | 6,000,000 | |||||
29(Base Project Allocation - $6,000,000) |
| |||||
30(UUU) Acquisition, construction,
1infrastructure, redevelopment and |
| |||||
7Project Allocation | 15,000,000 | |||||
| ||||||
10(VVV) Construction, infrastructure and |
| |||||
14Project Allocation | 750,000 | |||||
15(Base Project Allocation - $750,000) |
| |||||
16(WWW) Construction, infrastructure and |
| |||||
20Project Allocation | 500,000 | |||||
21(Base Project Allocation - $500,000) |
| |||||
22(XXX) Acquisition, construction, |
| |||||
27Project Allocation | 8,000,000 | |||||
28(Base Project Allocation - $8,000,000) |
| |||||
29(YYY) Construction, infrastructure and
1upgrade project |
| |||||
2Project Allocation | 500,000 | |||||
3(Base Project Allocation - $500,000) |
| |||||
4(ZZZ) Acquisition, construction, |
| |||||
8Project Allocation | 2,000,000 | |||||
9(Base Project Allocation - $2,000,000) |
| |||||
10(AAAA) Construction, site preparation, |
| |||||
15Project Allocation | 10,000,000 | |||||
| ||||||
18(BBBB) Construction, infrastructure, |
| |||||
21Project Allocation | 30,000,000 | |||||
| ||||||
24(CCCC) Construction, infrastructure, |
| |||||
28Project Allocation | 6,500,000 | |||||
29(Base Project Allocation - $6,500,000) |
| |||||
30(DDDD) Construction, infrastructure,
1renovations and other costs for |
| |||||
5Project Allocation | 3,100,000 | |||||
6(Base Project Allocation - $3,100,000) |
| |||||
7(EEEE) Acquisition, construction, |
| |||||
11Project Allocation | 4,500,000 | |||||
12(Base Project Allocation - $4,500,000) |
| |||||
13(FFFF) Acquisition, construction, |
| |||||
17Project Allocation | 7,500,000 | |||||
18(Base Project Allocation - $7,500,000) |
| |||||
19(GGGG) Acquisition, construction, |
| |||||
24Project Allocation | 5,000,000 | |||||
25(Base Project Allocation - $5,000,000) |
| |||||
26(HHHH) Acquisition, construction, |
| |||||
30Project Allocation | 6,000,000 | |||||
1(Base Project Allocation - $6,000,000) |
| |||||
2(IIII) Acquisition, construction, |
| |||||
6Project Allocation | 3,000,000 | |||||
7(Base Project Allocation - $3,000,000) |
| |||||
8(JJJJ) Acquisition, construction, |
| |||||
12Project Allocation | 12,000,000 | |||||
| ||||||
15(KKKK) Acquisition, construction, |
| |||||
19Project Allocation | 6,000,000 | |||||
20(Base Project Allocation - $6,000,000) |
| |||||
21(LLLL) Acquisition, construction, |
| |||||
25Project Allocation | 8,000,000 | |||||
26(Base Project Allocation - $8,000,000) |
| |||||
27(MMMM) Acquisition, construction,
1Street |
| |||||
2Project Allocation | 7,500,000 | |||||
3(Base Project Allocation - $7,500,000) |
| |||||
4(NNNN) Acquisition, construction, |
| |||||
9Project Allocation | 20,000,000 | |||||
| ||||||
12(OOOO) Acquisition, construction, |
| |||||
17Project Allocation | 10,000,000 | |||||
| ||||||
20(PPPP) Acquisition, construction, |
| |||||
24Project Allocation | 2,000,000 | |||||
25(Base Project Allocation - $2,000,000) |
| |||||
26(QQQQ) Construction, infrastructure and |
| |||||
29Project Allocation | 2,000,000 | |||||
30(Base Project Allocation - $2,000,000) |
| |||||
1(RRRR) Construction, infrastructure and |
| |||||
5Project Allocation | 4,500,000 | |||||
6(Base Project Allocation - $4,500,000) |
| |||||
7(SSSS) Acquisition, infrastructure, |
| |||||
10Project Allocation | 6,500,000 | |||||
11(Base Project Allocation - $6,500,000) |
| |||||
12(TTTT) Acquisition, infrastructure, |
| |||||
16Project Allocation | 10,000,000 | |||||
| ||||||
19(UUUU) Acquisition, infrastructure, |
| |||||
23Project Allocation | 1,000,000 | |||||
24(Base Project Allocation - $1,000,000) |
| |||||
25(VVVV) Construction, infrastructure and |
| |||||
30Project Allocation | 250,000 | |||||
1(Base Project Allocation - $250,000) |
| |||||
2(WWWW) Construction, renovation, |
| |||||
6Project Allocation | 10,000,000 | |||||
| ||||||
9(XXXX) Acquisition, construction, |
| |||||
14Project Allocation | 6,000,000 | |||||
15(Base Project Allocation - $6,000,000) |
| |||||
16(YYYY) Acquisition, construction, |
| |||||
22Project Allocation | 5,000,000 | |||||
23(Base Project Allocation - $5,000,000) |
| |||||
24(ZZZZ) Construction of the Chinatown |
| |||||
29Project Allocation | 5,000,000 | |||||
30(Base Project Allocation - $5,000,000) |
| |||||
1(A5) Construction, renovation, |
| |||||
6Project Allocation | 2,000,000 | |||||
7(Base Project Allocation - $2,000,000) |
| |||||
8(B5) Construction, renovation, |
| |||||
12Project Allocation | 5,000,000 | |||||
13(Base Project Allocation - $5,000,000) |
| |||||
14(C5) Construction, rehabilitation, |
| |||||
20Project Allocation | 2,500,000 | |||||
21(Base Project Allocation - $2,500,000) |
| |||||
22(D5) Construction, rehabilitation, |
| |||||
28Project Allocation | 13,500,000 | |||||
| ||||||
1(E5) Construction, infrastructure and |
| |||||
4Project Allocation | 20,000,000 | |||||
| ||||||
7(F5) Construction and infrastructure |
| |||||
11Project Allocation | 1,000,000 | |||||
12(Base Project Allocation - $1,000,000) |
| |||||
13(G5) Construction, renovation and |
| |||||
16Project Allocation | 4,800,000 | |||||
17(Base Project Allocation - $4,800,000) |
| |||||
18(H5) Acquisition, construction, |
| |||||
23Project Allocation | 1,000,000 | |||||
24(Base Project Allocation - $1,000,000) |
| |||||
25(I5) Acquisition, construction, |
| |||||
30Project Allocation | 1,300,000 | |||||
1(Base Project Allocation - $1,300,000) |
| |||||
2(J5) Acquisition, construction, |
| |||||
7Project Allocation | 3,700,000 | |||||
8(Base Project Allocation - $3,700,000) |
| |||||
9(K5) Acquisition, construction, |
| |||||
13Project Allocation | 10,000,000 | |||||
| ||||||
16(L5) Acquisition, construction, |
| |||||
21Project Allocation | 10,000,000 | |||||
| ||||||
24(M5) Acquisition, construction, |
| |||||
28Project Allocation | 10,000,000 | |||||
| ||||||
1(N5) Construction, infrastructure |
| |||||
4Project Allocation | 2,000,000 | |||||
5(Base Project Allocation - $2,000,000) |
| |||||
6(O5) Construction, infrastructure |
| |||||
11Project Allocation | 8,000,000 | |||||
12(Base Project Allocation - $8,000,000) |
| |||||
13(P5) Construction, infrastructure |
| |||||
17Project Allocation | 12,000,000 | |||||
| ||||||
20(Q5) Construction, infrastructure |
| |||||
25Project Allocation | 8,000,000 | |||||
26(Base Project Allocation - $8,000,000) |
| |||||
27(R5) Construction, infrastructure
1Avenue shopping center |
| |||||
2Project Allocation | 5,000,000 | |||||
3(Base Project Allocation - $5,000,000) |
| |||||
4(S5) Construction, infrastructure |
| |||||
9Project Allocation | 4,000,000 | |||||
10(Base Project Allocation - $4,000,000) |
| |||||
11(T5) Acquisition, demolition, |
| |||||
16Project Allocation | 25,000,000 | |||||
| ||||||
19(U5) Acquisition, infrastructure and |
| |||||
22Project Allocation | 2,500,000 | |||||
23(Base Project Allocation - $2,500,000) |
| |||||
<-24(V5) Construction, infrastructure and |
| |||||
28Project Allocation | 2,000,000 | |||||
29(Base Project Allocation - $2,000,000) |
| |||||
30(W5) Construction, infrastructure and
1other related costs for development of |
| |||||
6Project Allocation | 30,000,000 | |||||
| ||||||
9(X5) Acquisition, construction, |
| |||||
14Project Allocation | 4,000,000 | |||||
15(Base Project Allocation - $4,000,000) |
| |||||
16(Y5) Acquisition, construction, |
| |||||
23Project Allocation | 4,000,000 | |||||
24(Base Project Allocation - $4,000,000) |
| |||||
25(Z5) Acquisition, construction, |
| |||||
30Project Allocation | 1,000,000 | |||||
1(Base Project Allocation - $1,000,000) |
| |||||
2(A6) Acquisition, construction, |
| |||||
7Project Allocation | 1,300,000 | |||||
8(Base Project Allocation - $1,300,000) |
| |||||
9(B6) Acquisition, construction, |
| |||||
14Project Allocation | 3,700,000 | |||||
15(Base Project Allocation - $3,700,000) |
| |||||
16(C6) Acquisition, construction, |
| |||||
19Project Allocation | 4,500,000 | |||||
20(Base Project Allocation - $4,500,000) |
| |||||
21(D6) Construction, infrastructure, |
| |||||
24Project Allocation | 5,000,000 | |||||
25(Base Project Allocation - $5,000,000) |
| |||||
26(E6) Construction and other related costs |
| |||||
28Project Allocation | 500,000 | |||||
29(Base Project Allocation - $500,000) |
| |||||
30(F6) Acquisition, construction,
1redevelopment and other related costs |
| |||||
4Project Allocation | 12,000,000 | |||||
| ||||||
7(G6) Construction, infrastructure, |
| |||||
12Project Allocation | 6,000,000 | |||||
13(Base Project Allocation - $6,000,000) |
| |||||
14(H6) Acquisition, construction, |
| |||||
20Project Allocation | 20,000,000 | |||||
| ||||||
23(I6) Acquisition, construction, |
| |||||
29Project Allocation | 20,000,000 | |||||
30(Base Project Allocation -
1$20,000,000) |
| |||||
2(J6) Construction, infrastructure, |
| |||||
6Project Allocation | 300,000 | |||||
7(Base Project Allocation - $300,000) |
| |||||
8(K6) Construction, redevelopment and |
| |||||
12Project Allocation | 1,300,000 | |||||
13(Base Project Allocation - $1,300,000) |
| |||||
14(L6) Acquisition, construction, |
| |||||
19Project Allocation | 8,500,000 | |||||
20(Base Project Allocation - $8,500,000) |
| |||||
21(M6) Construction and other related costs |
| |||||
24Project Allocation | 1,000,000 | |||||
25(Base Project Allocation - $1,000,000) |
| |||||
26(N6) Acquisition, redevelopment and other |
| |||||
29Project Allocation | 500,000 | |||||
30(Base Project Allocation - $500,000) |
| |||||
1(O6) Acquisition, construction and other |
| |||||
4Project Allocation | 1,000,000 | |||||
5(Base Project Allocation - $1,000,000) |
| |||||
6(P6) Acquisition, construction, |
| |||||
11Project Allocation | 3,000,000 | |||||
12(Base Project Allocation - $3,000,000) |
| |||||
13(Q6) Acquisition, construction, |
| |||||
16Project Allocation | 7,500,000 | |||||
17(Base Project Allocation - $7,500,000) |
| |||||
18(R6) Construction, infrastructure and |
| |||||
22Project Allocation | 2,500,000 | |||||
23(Base Project Allocation - $2,500,000) |
| |||||
24(S6) Construction, infrastructure, |
| |||||
27Project Allocation | 7,500,000 | |||||
28(Base Project Allocation - $7,500,000) |
| |||||
29(T6) Acquisition, construction,
1other related costs for supermarket |
| |||||
3Project Allocation | 4,375,000 | |||||
4(Base Project Allocation - $4,375,000) |
| |||||
5(U6) Acquisition, construction, |
| |||||
9Project Allocation | 4,375,000 | |||||
10(Base Project Allocation - $4,375,000) |
| |||||
11(V6) Acquisition, construction, |
| |||||
16Project Allocation | 1,500,000 | |||||
17(Base Project Allocation - $1,500,000) |
| |||||
18(W6) Acquisition, construction, |
| |||||
22Project Allocation | 7,500,000 | |||||
23(Base Project Allocation - $7,500,000) |
| |||||
24(X6) Acquisition, construction, |
| |||||
28Project Allocation | 2,500,000 | |||||
29(Base Project Allocation - $2,500,000) |
| |||||
30(Y6) Acquisition, construction,
1infrastructure and other related costs |
| |||||
4Project Allocation | 7,467,000 | |||||
5(Base Project Allocation - $7,467,000) |
| |||||
6(Z6) Acquisition, construction, |
| |||||
10Project Allocation | 1,925,000 | |||||
11(Base Project Allocation - $1,925,000) |
| |||||
12(A7) Acquisition, construction and other |
| |||||
15Project Allocation | 1,000,000 | |||||
16(Base Project Allocation - $1,000,000) |
| |||||
17(B7) Acquisition, construction, |
| |||||
21Project Allocation | 3,000,000 | |||||
22(Base Project Allocation - $3,000,000) |
| |||||
23(C7) Construction, redevelopment and |
| |||||
26Project Allocation | 1,300,000 | |||||
27(Base Project Allocation - $1,300,000) |
| |||||
28(D7) Acquisition, construction,
1supportive services infrastructure for |
| |||||
3Project Allocation | 3,000,000 | |||||
4(Base Project Allocation - $3,000,000) |
| |||||
5(E7) Construction, infrastructure, |
| |||||
9Project Allocation | 5,000,000 | |||||
10(Base Project Allocation - $5,000,000) |
| |||||
11(F7) Acquisition, construction, |
| |||||
15Project Allocation | 8,000,000 | |||||
16(Base Project Allocation - $8,000,000) |
| |||||
17(G7) Acquisition, construction, |
| |||||
21Project Allocation | 5,000,000 | |||||
22(Base Project Allocation - $5,000,000) |
| |||||
23(H7) Acquisition, construction, |
| |||||
27Project Allocation | 6,000,000 | |||||
28(Base Project Allocation - $6,000,000) |
| |||||
29(I7) Acquisition, construction,
1for Metropolitan Opera House |
| |||||
2Project Allocation | 3,000,000 | |||||
3(Base Project Allocation - $3,000,000) |
| |||||
4(J7) Construction and other related costs |
| |||||
6Project Allocation | 550,000 | |||||
7(Base Project Allocation - $550,000) |
| |||||
8(K7) Acquisition, construction, |
| |||||
12Project Allocation | 10,000,000 | |||||
| ||||||
15(L7) Construction, infrastructure, |
| |||||
19Project Allocation | 20,000,000 | |||||
| ||||||
22(M7) Acquisition, construction, |
| |||||
26Project Allocation | 5,000,000 | |||||
27(Base Project Allocation - $5,000,000) |
| |||||
28(N7) Acquisition, construction,
1City High School |
| |||||
2Project Allocation | 6,000,000 | |||||
3(Base Project Allocation - $6,000,000) |
| |||||
4(O7) Construction, infrastructure, |
| |||||
7Project Allocation | 30,000,000 | |||||
| ||||||
10(P7) Acquisition, construction and other |
| |||||
13Project Allocation | 700,000 | |||||
14(Base Project Allocation - $700,000) |
| |||||
15(Q7) Infrastructure, redevelopment and |
| |||||
19Project Allocation | 500,000 | |||||
20(Base Project Allocation - $500,000) |
| |||||
21(R7) Acquisition, construction, |
| |||||
25Project Allocation | 5,000,000 | |||||
26(Base Project Allocation - $5,000,000) |
| |||||
27(S7) Acquisition, construction,
1District |
| |||||
2Project Allocation | 500,000 | |||||
3(Base Project Allocation - $500,000) |
| |||||
4(T7) Construction, redevelopment, |
| |||||
9Project Allocation | 750,000 | |||||
10(Base Project Allocation - $750,000) |
| |||||
11(U7) Construction, redevelopment and |
| |||||
14Project Allocation | 300,000 | |||||
15(Base Project Allocation - $300,000) |
| |||||
16(V7) Acquisition, construction, |
| |||||
20Project Allocation | 6,000,000 | |||||
21(Base Project Allocation - $6,000,000) |
| |||||
22(W7) Acquisition, construction, |
| |||||
25Project Allocation | 5,000,000 | |||||
26(Base Project Allocation - $5,000,000) |
| |||||
27(X7) Acquisition, infrastructure |
| |||||
1Project Allocation | 2,000,000 | |||||
2(Base Project Allocation - $2,000,000) |
| |||||
3(Y7) Construction, infrastructure, |
| |||||
7Project Allocation | 5,000,000 | |||||
8(Base Project Allocation - $5,000,000) |
| |||||
9(Z7) Acquisition, construction and other |
| |||||
12Project Allocation | 25,000,000 | |||||
| ||||||
15(A8) Construction and other related costs |
| |||||
17Project Allocation | 750,000 | |||||
18(Base Project Allocation - $750,000) |
| |||||
19(B8) Construction, infrastructure and |
| |||||
22Project Allocation | 500,000 | |||||
23(Base Project Allocation - $500,000) |
| |||||
24(C8) Acquisition, construction and other |
| |||||
26Project Allocation | 1,000,000 | |||||
27(Base Project Allocation - $1,000,000) |
| |||||
28(D8) Construction, infrastructure and
1Philadelphia branch |
| |||||
2Project Allocation | 2,000,000 | |||||
3(Base Project Allocation - $2,000,000) |
| |||||
4(E8) Acquisition, construction, |
| |||||
8Project Allocation | 20,000,000 | |||||
| ||||||
11(F8) Construction, infrastructure, |
| |||||
15Project Allocation | 2,000,000 | |||||
16(Base Project Allocation - $2,000,000) |
| |||||
17(G8) Acquisition, infrastructure, |
| |||||
23Project Allocation | 10,000,000 | |||||
| ||||||
26(H8) Acquisition, construction, |
| |||||
29Project Allocation | 2,000,000 | |||||
30(Base Project Allocation - $2,000,000) |
| |||||
1(I8) Construction, acquisition, |
| |||||
5Project Allocation | 10,000,000 | |||||
| ||||||
8(J8) Construction, abatement of hazardous |
| |||||
13Project Allocation | 500,000 | |||||
14(Base Project Allocation - $500,000) |
| |||||
<-15(K8) Acquisition, construction, |
| |||||
20Project Allocation | 25,000,000 | |||||
| ||||||
23(L8) Acquisition, construction and other |
| |||||
26Project Allocation | 2,373,000 | |||||
27(Base Project Allocation - $2,373,000) |
| |||||
28(M8) Construction, infrastructure, |
| |||||
3Project Allocation | 2,000,000 | |||||
4(Base Project Allocation - $2,000,000) |
| |||||
5(N8) Construction, infrastructure, |
| |||||
10Project Allocation | 8,000,000 | |||||
11(Base Project Allocation - $8,000,000) |
| |||||
12(O8) Construction, infrastructure, |
| |||||
17Project Allocation | 1,000,000 | |||||
18(Base Project Allocation - $1,000,000) |
| |||||
19(P8) Construction and other related costs |
| |||||
22Project Allocation | 1,000,000 | |||||
23(Base Project Allocation - $1,000,000) |
| |||||
24(52) Pike County |
| |||||
25(i) (Reserved) |
| |||||
26(53) Potter County |
| |||||
27(i) County projects |
| |||||
28(A) Acquisition, infrastructure, |
| |||||
1Project Allocation | 10,000,000 | |||||
| ||||||
4(54) Schuylkill County |
| |||||
| ||||||
7(A) Acquisition, infrastructure, |
| |||||
12Project Allocation | 2,500,000 | |||||
13(Base Project Allocation - $2,500,000) |
| |||||
14(B) Acquisition, infrastructure, |
| |||||
18Project Allocation | 1,000,000 | |||||
19(Base Project Allocation - $1,000,000) |
| |||||
20(C) Construction of industrial shell |
| |||||
22Project Allocation | 1,375,000 | |||||
23(Base Project Allocation - $1,375,000) |
| |||||
24(D) Acquisition, infrastructure, |
| |||||
30Project Allocation | 2,000,000 | |||||
1(Base Project Allocation - $2,000,000) |
| |||||
2(E) Construction of commercial and |
| |||||
5Project Allocation | 2,500,000 | |||||
6(Base Project Allocation - $2,500,000) |
| |||||
7(F) Construction of industrial shell |
| |||||
9Project Allocation | 2,925,000 | |||||
10(Base Project Allocation - $2,925,000) |
| |||||
11(G) Acquisition, infrastructure, |
| |||||
15Project Allocation | 3,000,000 | |||||
16(Base Project Allocation - $3,000,000) |
| |||||
17(ii) Coaldale Borough |
| |||||
18(A) Acquisition, infrastructure, |
| |||||
23Project Allocation | 2,500,000 | |||||
24(Base Project Allocation - $2,500,000) |
| |||||
25(B) Infrastructure, rehabilitation, |
| |||||
29Project Allocation | 10,000,000 | |||||
30(Base Project Allocation -
1$10,000,000) |
| |||||
2(iii) Mahanoy City Borough |
| |||||
3(A) Acquisition, infrastructure, |
| |||||
7Project Allocation | 1,500,000 | |||||
8(Base Project Allocation - $1,500,000) |
| |||||
<-9(iii.1) City of Pottsville |
| |||||
10(A) Infrastructure, construction and |
| |||||
14Project Allocation | 2,000,000 | |||||
15(Base Project Allocation - $2,000,000) |
| |||||
16(iv) Tamaqua Borough |
| |||||
17(A) Acquisition, infrastructure, |
| |||||
24Project Allocation | 2,000,000 | |||||
25(Base Project Allocation - $2,000,000) |
| |||||
26(B) Acquisition, infrastructure, |
| |||||
1Project Allocation | 2,500,000 | |||||
2(Base Project Allocation - $2,500,000) |
| |||||
3(C) Acquisition, infrastructure, |
| |||||
7Project Allocation | 4,000,000 | |||||
8(Base Project Allocation - $4,000,000) |
| |||||
9(D) Acquisition, infrastructure, |
| |||||
15Project Allocation | 5,000,000 | |||||
16(Base Project Allocation - $5,000,000) |
| |||||
17(55) Snyder County |
| |||||
18(i) (Reserved) |
| |||||
19(ii) Shamokin Dam Borough <-and Monroe Township |
| |||||
20(A) Construction, infrastructure, |
| |||||
25Project Allocation | 80,000,000 | |||||
| ||||||
28(56) Somerset County |
| |||||
29(i) County Projects |
| |||||
30(A) Land acquisition, construction,
1infrastructure and related costs for |
| |||||
4Project Allocation | 10,000,000 | |||||
| ||||||
<-7(B) Acquisition, construction, |
| |||||
10Project Allocation | 5,000,000 | |||||
11(Base Project Allocation - $5,000,000) |
| |||||
12(C) Acquisition, construction, |
| |||||
16Project Allocation | 1,000,000 | |||||
17(Base Project Allocation - $1,000,000) |
| |||||
18(D) Acquisition, construction, |
| |||||
21Project Allocation | 1,000,000 | |||||
22(Base Project Allocation - $1,000,000) |
| |||||
<-23(E) Acquisition, construction, |
| |||||
27Project Allocation | 50,000,000 | |||||
| ||||||
30(i.1) Quemahoning Township |
| |||||
1(A) Construction, infrastructure and |
| |||||
5Project Allocation | 2,000,000 | |||||
6(Base Project Allocation - $2,000,000) |
| |||||
7(i.2) Shade Township |
| |||||
8(A) Acquisition, construction, |
| |||||
12Project Allocation | 2,100,000 | |||||
13(Base Project Allocation - $2,100,000) |
| |||||
14(ii) Somerset Borough |
| |||||
15(A) Construction, infrastructure and |
| |||||
18Project Allocation | 4,000,000 | |||||
19(Base Project Allocation - $4,000,000) |
| |||||
20(iii) Somerset Township |
| |||||
21(A) Construction, infrastructure and |
| |||||
24Project Allocation | 500,000 | |||||
25(Base Project Allocation - $500,000) |
| |||||
<-26(iv) Windber Borough |
| |||||
27(A) Acquisition, construction, |
| |||||
3Project Allocation | 1,000,000 | |||||
4(Base Project Allocation - $1,000,000) |
| |||||
5(57) Sullivan County |
| |||||
6(i) (Reserved) |
| |||||
<-7(ii) Laporte Borough |
| |||||
8(A) Infrastructure, redevelopment and |
| |||||
12Project Allocation | 1,000,000 | |||||
13(Base Project Allocation - $1,000,000) |
| |||||
14(58) Susquehanna County |
| |||||
15(i) The Progress Authority |
| |||||
16(A) Infrastructure improvements, |
| |||||
20Project Allocation | 1,000,000 | |||||
21(Base Project Allocation - $1,000,000) |
| |||||
| ||||||
24(A) Construction, acquisition, |
| |||||
28Project Allocation | 2,000,000 | |||||
29(Base Project Allocation - $2,000,000) |
| |||||
30(iii) Bridgewater Township |
| |||||
1(A) Construction, infrastructure and |
| |||||
4Project Allocation | 500,000 | |||||
5(Base Project Allocation - $500,000) |
| |||||
6(59) Tioga County |
| |||||
7(i) County projects |
| |||||
8(A) Acquisition, infrastructure, |
| |||||
11Project Allocation | 10,000,000 | |||||
| ||||||
14(B) Infrastructure, renovation, |
| |||||
18Project Allocation | 2,100,000 | |||||
19(Base Project Allocation - $2,100,000) |
| |||||
20(C) Infrastructure, renovation, |
| |||||
25Project Allocation | 18,500,000 | |||||
| ||||||
28(ii) Tioga County Development Corporation |
| |||||
29(A) Design, engineering, site
1demolition, construction and other |
| |||||
6Project Allocation | 4,600,000 | |||||
7(Base Project Allocation - $4,600,000) |
| |||||
<-8(iii) Wellsboro Borough |
| |||||
9(A) Redevelopment, construction and other |
| |||||
12Project Allocation | 3,000,000 | |||||
13(Base Project Allocation - $3,000,000) |
| |||||
14(iv) Wellsboro Borough and Richmond Township |
| |||||
15(A) Construction, acquisition, expansion, |
| |||||
20Project Allocation | 15,000,000 | |||||
| ||||||
23(60) Union County |
| |||||
24(i) (Reserved) |
| |||||
<-25(ii) Kelly Township |
| |||||
26(A) Transportation infrastructure |
| |||||
1Project Allocation | 4,100,000 | |||||
2(Base Project Allocation - $4,100,000) |
| |||||
3(61) Venango County |
| |||||
4(i) Oil Region Alliance |
| |||||
5(A) Acquisition, infrastructure, |
| |||||
11Project Allocation | 7,000,000 | |||||
12(Base Project Allocation - $7,000,000) |
| |||||
13(62) Warren County |
| |||||
14(i) County projects |
| |||||
15(A) Acquisition, infrastructure, |
| |||||
18Project Allocation | 10,000,000 | |||||
| ||||||
21(63) Washington County |
| |||||
22(i) County projects |
| |||||
23(A) Acquisition, construction, |
| |||||
27Project Allocation | 2,000,000 | |||||
28(Base Project Allocation - $2,000,000) |
| |||||
29(B) Acquisition, construction,
1other costs related to development of |
| |||||
4Project Allocation | 5,000,000 | |||||
5(Base Project Allocation - $5,000,000) |
| |||||
6(C) Acquisition, construction, |
| |||||
10Project Allocation | 10,000,000 | |||||
| ||||||
<-13(D) Acquisition, construction, |
| |||||
17Project Allocation | 3,000,000 | |||||
18(Base Project Allocation - $3,000,000) |
| |||||
19(E) Acquisition, construction, |
| |||||
23Project Allocation | 3,000,000 | |||||
24(Base Project Allocation - $3,000,000) |
| |||||
25(F) Construction, infrastructure and |
| |||||
28Project Allocation | 5,000,000 | |||||
29(Base Project Allocation - $5,000,000) |
| |||||
30(G) Acquisition, construction,
1infrastructure and other related costs |
| |||||
4Project Allocation | 10,000,000 | |||||
| ||||||
7(H) Construction, rehabilitation and |
| |||||
10Project Allocation | 2,050,000 | |||||
11(Base Project Allocation - $2,050,000) |
| |||||
12(I) Construction, infrastructure, |
| |||||
17Project Allocation | 3,000,000 | |||||
18(Base Project Allocation - $3,000,000) |
| |||||
19(J) Acquisition, infrastructure and other |
| |||||
22Project Allocation | 5,000,000 | |||||
23(Base Project Allocation - $5,000,000) |
| |||||
24(K) Acquisition, construction, |
| |||||
28Project Allocation | 5,000,000 | |||||
29(Base Project Allocation - $5,000,000) |
| |||||
30(L) Construction, abatement of hazardous
1materials and other related costs for |
| |||||
4Project Allocation | 5,000,000 | |||||
5(Base Project Allocation - $5,000,000) |
| |||||
6(ii) Allenport Borough |
| |||||
7(A) Acquisition, construction, |
| |||||
12Project Allocation | 10,000,000 | |||||
| ||||||
<-15(ii.1) Buffalo Township |
| |||||
16(A) Acquisition, construction, |
| |||||
19Project Allocation | 500,000 | |||||
20(Base Project Allocation - $500,000) |
| |||||
21(B) Construction, infrastructure and |
| |||||
25Project Allocation | 1,000,000 | |||||
26(Base Project Allocation - $1,000,000) |
| |||||
27(ii.2) Burgettstown Borough |
| |||||
28(A) Construction, infrastructure and |
| |||||
1Project Allocation | 15,000,000 | |||||
| ||||||
4(ii.3) California Borough |
| |||||
5(A) Construction, redevelopment and other |
| |||||
8Project Allocation | 500,000 | |||||
9(Base Project Allocation - $500,000) |
| |||||
10(ii.1) <-(ii.4) Canonsburg Borough |
| |||||
11(A) Acquisition, construction, |
| |||||
15Project Allocation | 5,000,000 | |||||
16(Base Project Allocation - $5,000,000) |
| |||||
<-17(ii.5) Carroll Township |
| |||||
18(A) Construction, infrastructure |
| |||||
21Project Allocation | 1,000,000 | |||||
22(Base Project Allocation - $1,000,000) |
| |||||
23(B) Acquisition, construction, |
| |||||
26Project Allocation | 4,750,000 | |||||
27(Base Project Allocation - $4,750,000) |
| |||||
28(C) Construction, redevelopment and other |
| |||||
1Project Allocation | 1,000,000 | |||||
2(Base Project Allocation - $1,000,000) |
| |||||
3(ii.6) Cecil Township |
| |||||
4(A) Acquisition, construction, |
| |||||
7Project Allocation | 1,250,000 | |||||
8(Base Project Allocation - $1,250,000) |
| |||||
9(iii) Hanover Township |
| |||||
10(A) Acquisition, construction, |
| |||||
14Project Allocation | 15,000,000 | |||||
| ||||||
<-17(iii.1) Jefferson Township |
| |||||
18(A) Acquisition, construction, |
| |||||
23Project Allocation | 2,000,000 | |||||
24(Base Project Allocation - $2,000,000) |
| |||||
25(iii.2) City of Monongahela |
| |||||
26(A) Acquisition, construction, |
| |||||
1Project Allocation | 600,000 | |||||
2(Base Project Allocation - $600,000) |
| |||||
3(iii.3) Peters Township |
| |||||
4(A) Construction, infrastructure, |
| |||||
8Project Allocation | 650,000 | |||||
9(Base Project Allocation - $650,000) |
| |||||
10(B) Construction, infrastructure, |
| |||||
14Project Allocation | 500,000 | |||||
15(Base Project Allocation - $500,000) |
| |||||
16(iii.4) South Fayette Township |
| |||||
17(A) Acquisition, construction, |
| |||||
20Project Allocation | 1,000,000 | |||||
21(Base Project Allocation - $1,000,000) |
| |||||
22(B) Construction, infrastructure and |
| |||||
24Project Allocation | 4,000,000 | |||||
25(Base Project Allocation - $4,000,000) |
| |||||
26(iv) South Strabane Township |
| |||||
27(A) Acquisition, construction, |
| |||||
1Project Allocation | 10,000,000 | |||||
| ||||||
4(B) Acquisition, construction, |
| |||||
8Project Allocation | 10,000,000 | |||||
| ||||||
11(C) Acquisition, construction, |
| |||||
16Project Allocation | 3,000,000 | |||||
17(Base Project Allocation - $3,000,000) |
| |||||
18(D) Acquisition, construction, |
| |||||
23Project Allocation | 5,000,000 | |||||
24(Base Project Allocation - $5,000,000) |
| |||||
25(E) Acquisition, construction, |
| |||||
30Project Allocation | 5,000,000 | |||||
1(Base Project Allocation - $5,000,000) |
| |||||
2(F) Acquisition, construction, |
| |||||
8Project Allocation | 10,000,000 | |||||
| ||||||
11(G) Acquisition, construction, |
| |||||
15Project Allocation | 5,000,000 | |||||
16(Base Project Allocation - $5,000,000) |
| |||||
17(H) Acquisition, infrastructure, |
| |||||
21Project Allocation | 3,000,000 | |||||
22(Base Project Allocation - $3,000,000) |
| |||||
<-23(I) Acquisition, construction, |
| |||||
28Project Allocation | 5,000,000 | |||||
29(Base Project Allocation - $5,000,000) |
| |||||
30(J) Acquisition, construction,
1infrastructure, redevelopment and |
| |||||
4Project Allocation | 10,000,000 | |||||
| ||||||
7(K) Acquisition, construction, |
| |||||
11Project Allocation | 10,000,000 | |||||
| ||||||
14(64) Wayne County |
| |||||
15(i) (Reserved) |
| |||||
16(65) Westmoreland County |
| |||||
17(i) County projects |
| |||||
18(A) Construction, renovation, |
| |||||
23Project Allocation | 4,500,000 | |||||
24(Base Project Allocation - $4,500,000) |
| |||||
25(B) Construction of Excela Health System |
| |||||
27Project Allocation | 10,000,000 | |||||
| ||||||
30(C) Construction of Excela Health System
1Orthopedic Center of Excellence |
| |||||
2Project Allocation | 11,500,000 | |||||
| ||||||
5(D) Infrastructure, renovation, abatement |
| |||||
11Project Allocation | 4,000,000 | |||||
12(Base Project Allocation - $4,000,000) |
| |||||
13(ii) Latrobe Redevelopment Authority |
| |||||
14(A) Construction of LEED-certified |
| |||||
17Project Allocation | 8,000,000 | |||||
18(Base Project Allocation - $8,000,000) |
| |||||
19(iii) Westmoreland County Industrial |
| |||||
21(A) Acquisition, demolition, site |
| |||||
28Project Allocation | 1,000,000 | |||||
29(Base Project Allocation - $1,000,000) |
| |||||
30(B) Acquisition, infrastructure
1extensions and improvements, |
| |||||
4Project Allocation | 2,000,000 | |||||
5(Base Project Allocation - $2,000,000) |
| |||||
6(iv) City of Lower Burrell |
| |||||
7(A) Acquisition, construction, |
| |||||
12Project Allocation | 2,000,000 | |||||
13(Base Project Allocation - $2,000,000) |
| |||||
<-14(v) City of New Kensington |
| |||||
15(A) Construction, acquisition, |
| |||||
20Project Allocation | 5,000,000 | |||||
21(Base Project Allocation - $5,000,000) |
| |||||
22(vi) East Huntingdon Township |
| |||||
23(A) Construction, infrastructure, |
| |||||
27Project Allocation | 4,000,000 | |||||
28(Base Project Allocation - $4,000,000) |
| |||||
29(vii) Hempfield Township |
| |||||
30(A) Acquisition, construction,
1infrastructure, redevelopment and |
| |||||
4Project Allocation | 10,000,000 | |||||
| ||||||
7(viii) City of Monessen |
| |||||
8(A) Construction, redevelopment and other |
| |||||
11Project Allocation | 1,000,000 | |||||
12(Base Project Allocation - $1,000,000) |
| |||||
13(B) Construction, infrastructure and |
| |||||
16Project Allocation | 750,000 | |||||
17(Base Project Allocation - $750,000) |
| |||||
18(v) <-(ix) North Huntington Township |
| |||||
19(A) Construction and other related costs |
| |||||
26Project Allocation | 2,500,000 | |||||
27(Base Project Allocation - $2,500,000) |
| |||||
<-28(x) Upper Burrell Township |
| |||||
29(A) Acquisition, infrastructure
1related costs for industrial park |
| |||||
2Project Allocation | 5,000,000 | |||||
3(Base Project Allocation - $5,000,000) |
| |||||
4(66) Wyoming County |
| |||||
5(i) (Reserved) |
| |||||
6(67) York County |
| |||||
| ||||||
9(A) Acquisition, infrastructure, |
| |||||
14Project Allocation | 5,000,000 | |||||
15(Base Project Allocation - $5,000,000) |
| |||||
16(B) Acquisition, infrastructure, |
| |||||
24Project Allocation | 6,000,000 | |||||
25(Base Project Allocation - $6,000,000) |
| |||||
| ||||||
28(A) Infrastructure, renovation,
1including historic buildings, blighted |
| |||||
3Project Allocation | 8,000,000 | |||||
4(Base Project Allocation - $8,000,000) |
| |||||
5(B) Infrastructure, construction and |
| |||||
11Project Allocation | 10,000,000 | |||||
| ||||||
14(C) Infrastructure, construction and |
| |||||
21Project Allocation | 12,000,000 | |||||
| ||||||
24(iii) City of York |
| |||||
25(A) Construction, renovation, |
| |||||
29Project Allocation | 10,000,000 | |||||
30(Base Project Allocation -
1$10,000,000) |
| |||||
<-2(B) Construction, infrastructure, |
| |||||
6Project Allocation | 15,000,000 | |||||
| ||||||
9(iv) Red Lion Borough |
| |||||
10(A) Construction, infrastructure and |
| |||||
13Project Allocation | 1,040,000 | |||||
14(Base Project Allocation - $1,040,000) |
| |||||
15(68) Multiple Counties |
| |||||
| ||||||
18(A) Acquisition, infrastructure, |
| |||||
23Project Allocation | 5,000,000 | |||||
24(Base Project Allocation - $5,000,000) |
| |||||
25(ii) Centre, Columbia, Lackawanna, Luzerne, |
| |||||
28(A) Acquisition, construction,
1deliver medical services, conduct |
| |||||
4Project Allocation | 30,000,000 | |||||
| ||||||
7(iii) Pike and Wayne Counties |
| |||||
8(A) Wayne Economic Development |
| |||||
13Project Allocation | 11,000,000 | |||||
| ||||||
16(iv) Berks, Lehigh and York Counties |
| |||||
17(A) Redevelopment Authority of the City |
| |||||
27Project Allocation | 10,000,000 | |||||
| ||||||
30(v) Allegheny, Beaver, Cambria, Erie,
1Washington and Westmoreland Counties |
| |||||
2(A) Acquisition, construction, |
| |||||
6Project Allocation | 10,000,000 | |||||
| ||||||
9(vi) Lackawanna and Luzerne Counties |
| |||||
10(A) Acquisition, construction, |
| |||||
14Project Allocation | 18,000,000 | |||||
| ||||||
17(vii) Montgomery and Philadelphia Counties |
| |||||
18(A) Construction, infrastructure and |
| |||||
21Project Allocation | 21,300,000 | |||||
| ||||||
24(B) City Avenue Special Services |
| |||||
1Project Allocation | 5,000,000 | |||||
2(Base Project Allocation - $5,000,000) |
| |||||
3(viii) Berks and Montgomery Counties |
| |||||
4(A) Construction, infrastructure and |
| |||||
8Project Allocation | 4,000,000 | |||||
9(Base Project Allocation - $4,000,000) |
| |||||
10(ix) Fayette and Somerset Counties |
| |||||
11(A) Infrastructure improvements, new |
| |||||
15Project Allocation | 5,000,000 | |||||
16(Base Project Allocation - $5,000,000) |
|
17Section 7. Itemization of flood control projects.
18Additional capital projects in the category of flood control
19projects to be constructed by the Department of Environmental
20Protection, its successors or assigns, and to be financed by the
21incurring of debt are hereby itemized, together with their
22respective estimated costs, as follows:
24Project | Total Project Allocation | |||||
25(1) Department of Environmental Protection |
| |||||
26(i) Allegheny County |
| |||||
27(A) Funding for flood protection and |
| |||||
30Project Allocation | 900,000 | |||||
1(Base Project Allocation - $810,000) |
| |||||
2(Design & Contingencies - $90,000) |
| |||||
3(B) Infrastructure, construction and |
| |||||
9Project Allocation | 96,000 | |||||
10(Base Project Allocation - $80,000) |
| |||||
11(Design & Contingencies - $16,000) |
| |||||
<-12(ii) Bucks County |
| |||||
13(A) Construction and other related costs |
| |||||
18Project Allocation | 100,000 | |||||
19(Base Project Allocation - $100,000) |
| |||||
20(B) Rehabilitation and other related |
| |||||
23Project Allocation | 500,000 | |||||
24(Base Project Allocation - $500,000) |
| |||||
25(ii) <-(iii) Cambria County |
| |||||
26(A) Additional funding for DGS Project |
| |||||
1Project Allocation | 1,350,000 | |||||
2(Base Project Allocation - $1,215,000) |
| |||||
3(Design & Contingencies - $135,000) |
| |||||
4(B) Funding for flood protection of |
| |||||
8Project Allocation | 540,000 | |||||
9(Base Project Allocation - $486,000) |
| |||||
10(Design & Contingencies - $54,000) |
| |||||
11(C) Rehabilitate five levee drainage |
| |||||
16Project Allocation | 1,350,000 | |||||
17(Base Project Allocation - $1,215,000) |
| |||||
18(Design & Contingencies - $135,000) |
| |||||
19(D) Funding for flood protection of |
| |||||
23Project Allocation | 900,000 | |||||
24(Base Project Allocation - $810,000) |
| |||||
25(Design & Contingencies - $90,000) |
| |||||
<-26(iv) Chester County |
| |||||
27(A) Construction, infrastructure and |
| |||||
30Project Allocation | 7,000,000 | |||||
1(Base Project Allocation - $7,000,000) |
| |||||
2(B) Construction, infrastructure and |
| |||||
7Project Allocation | 9,000,000 | |||||
8(Base Project Allocation - $9,000,000) |
| |||||
<-9(C) Acquisition, construction, |
| |||||
14Project Allocation | 10,000,000 | |||||
| ||||||
17(v) Columbia County |
| |||||
18(A) Rehabilitation and other related |
| |||||
22Project Allocation | 1,000,000 | |||||
23(Base Project Allocation - $1,000,000) |
| |||||
24(iii) <-(vi) Delaware County |
| |||||
25(A) Construction, infrastructure and |
| |||||
28Project Allocation | 538,000 | |||||
29(Base Project Allocation - $538,000) |
| |||||
30(B) Acquisition, demolition,
1construction, infrastructure and other |
| |||||
4Project Allocation | 6,200,000 | |||||
5(Base Project Allocation - $6,200,000) |
| |||||
| ||||||
8Project Allocation | 550,000 | |||||
9(Base Project Allocation - $550,000) |
| |||||
10(iv) <-(vii) Lackawanna County |
| |||||
11(A) Rehabilitate seven levee drainage |
| |||||
15Project Allocation | 2,700,000 | |||||
16(Base Project Allocation - $2,430,000) |
| |||||
17(Design & Contingencies - $270,000) |
| |||||
18(B) Funding for Moosic flood protection |
| |||||
21Project Allocation | 2,700,000 | |||||
22(Base Project Allocation - $2,430,000) |
| |||||
23(Design & Contingencies - $270,000) |
| |||||
24(C) Funding for Blakely flood protection |
| |||||
28Project Allocation | 900,000 | |||||
29(Base Project Allocation - $810,000) |
| |||||
30(Design & Contingencies - $90,000) |
| |||||
1(D) Funding for Scranton flood control |
| |||||
4Project Allocation | 4,500,000 | |||||
5(Base Project Allocation - $4,050,000) |
| |||||
6(Design & Contingencies - $450,000) |
| |||||
7(E) Construction, infrastructure and |
| |||||
11Project Allocation | 1,540,000 | |||||
12(Base Project Allocation - $1,540,000) |
| |||||
13(F) Construction, infrastructure and |
| |||||
16Project Allocation | 772,000 | |||||
17(Base Project Allocation - $772,000) |
| |||||
<-18(G) Construction, infrastructure and |
| |||||
22Project Allocation | 2,500,000 | |||||
23(Base Project Allocation - $2,500,000) |
| |||||
24(v) (<-viii) Luzerne County |
| |||||
25(A) Additional funding for DGS Project |
| |||||
29Project Allocation | 540,000 | |||||
30(Base Project Allocation - $486,000) |
| |||||
1(Design & Contingencies - $54,000) |
| |||||
2(B) Funding for Mocanaqua flood |
| |||||
6Project Allocation | 540,000 | |||||
7(Base Project Allocation - $486,000) |
| |||||
8(Design & Contingencies - $54,000) |
| |||||
9(vi) <-(ix) Montgomery County |
| |||||
10(A) Funding for Ambler flood protection |
| |||||
16Project Allocation | 2,475,000 | |||||
17(Base Project Allocation - $2,250,000) |
| |||||
18(Design & Contingencies - $225,000) |
| |||||
19(B) Funding for Turnpike Drive storm |
| |||||
25Project Allocation | 550,000 | |||||
26(Base Project Allocation - $500,000) |
| |||||
27(Design & Contingencies - $50,000) |
| |||||
28(C) Acquisition, construction,
1project in Cheltenham Township |
| |||||
2Project Allocation | 8,000,000 | |||||
3(Base Project Allocation - $8,000,000) |
| |||||
4(D) Construction, infrastructure and |
| |||||
8Project Allocation | 1,000,000 | |||||
9(Base Project Allocation - $1,000,000) |
| |||||
10(E) Construction, infrastructure and |
| |||||
14Project Allocation | 5,000,000 | |||||
15(Base Project Allocation - $5,000,000) |
| |||||
<-16(F) Acquisition, construction, |
| |||||
20Project Allocation | 8,000,000 | |||||
21(Base Project Allocation - $8,000,000) |
| |||||
22(G) Construction, infrastructure and |
| |||||
27Project Allocation | 3,000,000 | |||||
28(Base Project Allocation - $3,000,000) |
| |||||
29(H) Construction, infrastructure and
1headwaters flood control project |
| |||||
2Project Allocation | 1,000,000 | |||||
3(Base Project Allocation - $1,000,000) |
| |||||
4(vii) <-(x) Northampton County |
| |||||
5(A) Permanent reconstruction of storm |
| |||||
9Project Allocation | 506,000 | |||||
10(Base Project Allocation - $506,000) |
| |||||
<-11(xi) Northumberland County |
| |||||
12(A) Construction, infrastructure, |
| |||||
17Project Allocation | 14,000,000 | |||||
| ||||||
20(B) Repairs to mitigate flood water in |
| |||||
23Project Allocation | 1,250,000 | |||||
24(Base Project Allocation - $1,250,000) |
| |||||
25(viii) <-(xii) Potter County |
| |||||
26(A) Rehabilitate three levee drainage |
| |||||
30Project Allocation | 900,000 | |||||
1(Base Project Allocation - $810,000) |
| |||||
2(Design & Contingencies - $90,000) |
| |||||
3(ix) <-(xiii) Schuylkill County |
| |||||
4(A) Funding for McAdoo flood protection |
| |||||
8Project Allocation | 540,000 | |||||
9(Base Project Allocation - $486,000) |
| |||||
10(Design & Contingencies - $54,000) |
| |||||
11(x) <-(xiv) Somerset County |
| |||||
12(A) Rehabilitate 25 levee drainage |
| |||||
16Project Allocation | 4,950,000 | |||||
17(Base Project Allocation - $4,455,000) |
| |||||
18(Design & Contingencies - $495,000) |
| |||||
19(B) Rehabilitate 18 levee drainage |
| |||||
23Project Allocation | 3,600,000 | |||||
24(Base Project Allocation - $3,240,000) |
| |||||
25(Design & Contingencies - $360,000) |
| |||||
26(C) Construction, infrastructure and |
| |||||
30Project Allocation | 10,000,000 | |||||
| ||||||
<-3(D) Construction, redevelopment, |
| |||||
6Project Allocation | 500,000 | |||||
7(Base Project Allocation - $500,000) |
| |||||
8(xi) <-(xv) Warren County |
| |||||
9(A) Rehabilitate nine levee drainage |
| |||||
12Project Allocation | 1,800,000 | |||||
13(Base Project Allocation - $1,620,000) |
| |||||
14(Design & Contingencies - $180,000) |
| |||||
15(xii) <-(xvi) Wayne County |
| |||||
16(A) Funding for White Mills channel |
| |||||
21Project Allocation | 540,000 | |||||
22(Base Project Allocation - $486,000) |
| |||||
23(Design & Contingencies - $54,000) |
| |||||
24(xiii) <-(xvii) Westmoreland County |
| |||||
25(A) Rehabilitate existing flood
1structures in South Greensburg Borough |
| |||||
2Project Allocation | 3,600,000 | |||||
3(Base Project Allocation - $3,240,000) |
| |||||
4(Design & Contingencies - $360,000) |
| |||||
<-5(xiii.1) Westmoreland County |
| |||||
6(A) <-(B) Additional funding for DGS |
| |||||
9Project Allocation | 5,000,000 | |||||
10(Base Project Allocation - $5,000,000) |
| |||||
<-11(C) Acquisition, construction, |
| |||||
17Project Allocation | 750,000 | |||||
18(Base Project Allocation - $750,000) |
| |||||
19(xiv) <-(xviii) Somerset and Fayette Counties |
| |||||
20(A) Rehabilitate 18 levee drainage |
| |||||
24Project Allocation | 4,050,000 | |||||
25(Base Project Allocation - $3,645,000) |
| |||||
26(Design & Contingencies - $405,000) |
| |||||
| ||||||
29(A) Regional watershed improvement
1feasibility study |
| |||||
2Project Allocation | 125,000 | |||||
3(Base Project Allocation - $125,000) |
|
4Section 8. Itemization of Keystone Recreation, Park and
5Conservation Fund projects.
6Projects in the category of public improvement projects to be
7constructed by the Department of Conservation and Natural
8Resources, its successors or assigns and to be financed by
9current revenues of the Keystone Recreation, Park and
10Conservation Fund are hereby itemized, together with their
11respective estimated costs, as follows:
13Project | Total Project | |||||
| ||||||
16(i) Bald Eagle State Forest |
| |||||
| ||||||
19Project Allocation | 316,000 | |||||
20(Base Project Allocation - $316,000) |
| |||||
21(B) Upgrade sewage treatment plant |
| |||||
22Project Allocation | 500,000 | |||||
23(Base Project Allocation - $500,000) |
| |||||
24(ii) Bald Eagle State Park |
| |||||
25(A) Renovate park office to meet |
| |||||
28Project Allocation | 1,000,000 | |||||
29(Base Project Allocation - $1,000,000) |
| |||||
30(iii) Blue Knob State Park |
| |||||
| ||||||
3Project Allocation | 250,000 | |||||
4(Base Project Allocation - $250,000) |
| |||||
5(iv) Buchanan State Forest |
| |||||
| ||||||
8Project Allocation | 1,750,000 | |||||
9(Base Project Allocation - $1,750,000) |
| |||||
10(v) Caledonia State Park |
| |||||
11(A) Replace shower houses and comfort |
| |||||
14Project Allocation | 1,300,000 | |||||
15(Base Project Allocation - $1,300,000) |
| |||||
16(vi) Codorus State Park |
| |||||
17(A) Replace sailboat areas and restrooms |
| |||||
19Project Allocation | 450,000 | |||||
20(Base Project Allocation - $450,000) |
| |||||
21(vii) Cook Forest State Park |
| |||||
22(A) Rehabilitate water storage tanks, |
| |||||
26Project Allocation | 600,000 | |||||
27(Base Project Allocation - $600,000) |
| |||||
| ||||||
30Project Allocation | 250,000 | |||||
1(Base Project Allocation - $250,000) |
| |||||
2(viii) Cook State Forest |
| |||||
3(A) Replace sewage lines |
| |||||
4Project Allocation | 175,000 | |||||
5(Base Project Allocation - $175,000) |
| |||||
6(ix) Delaware Canal State Park |
| |||||
7(A) Replace Ferry Street Bridge |
| |||||
8Project Allocation | 900,000 | |||||
9(Base Project Allocation - $900,000) |
| |||||
10(B) Replace Smithtown Bridge No. 5 |
| |||||
11Project Allocation | 800,000 | |||||
12(Base Project Allocation - $800,000) |
| |||||
13(C) Replace or rehabilitate Phillips |
| |||||
16Project Allocation | 1,200,000 | |||||
17(Base Project Allocation - $1,200,000) |
| |||||
18(D) Replace culverts on Rabbit Run |
| |||||
19Project Allocation | 750,000 | |||||
20(Base Project Allocation - $750,000) |
| |||||
| ||||||
23Project Allocation | 1,000,000 | |||||
24(Base Project Allocation - $1,000,000) |
| |||||
25(x) Denton Hill State Park |
| |||||
26(A) Upgrade, rehabilitation or |
| |||||
1Project Allocation | 750,000 | |||||
2(Base Project Allocation - $750,000) |
| |||||
3(xi) Evansburg State Park |
| |||||
4(A) Replace sewer lines throughout park |
| |||||
5Project Allocation | 480,000 | |||||
6(Base Project Allocation - $480,000) |
| |||||
7(xii) Frances Slocum State Park |
| |||||
8(A) Demolish sewage treatment plant and |
| |||||
10Project Allocation | 900,000 | |||||
11(Base Project Allocation - $900,000) |
| |||||
12(xii.1) French Creek State Park |
| |||||
| ||||||
15Project Allocation | 600,000 | |||||
16(Base Project Allocation - $600,000) |
| |||||
17(xiii) Gifford Pinchot State Park |
| |||||
18(A) Rehabilitate five shower houses |
| |||||
19Project Allocation | 1,500,000 | |||||
20(Base Project Allocation - $1,500,000) |
| |||||
21(xiv) Hickory Run State Park |
| |||||
22(A) Replace pit latrines with modern |
| |||||
25Project Allocation | 2,200,000 | |||||
26(Base Project Allocation - $2,200,000) |
| |||||
27(xv) Hills Creek State Park |
| |||||
28(A) Rehabilitate sewage treatment plant, |
| |||||
30Project Allocation | 250,000 | |||||
1(Base Project Allocation - $250,000) |
| |||||
2(B) Replace campground washhouses |
| |||||
3Project Allocation | 2,500,000 | |||||
4(Base Project Allocation - $2,500,000) |
| |||||
5(xvi) Lackawanna State Park |
| |||||
6(A) Rehabilitate pool complex and day use |
| |||||
10Project Allocation | 3,000,000 | |||||
11(Base Project Allocation - $3,000,000) |
| |||||
12(xvi.1) Lackawanna State Forest |
| |||||
13(A) Construct pole building for equipment |
| |||||
15Project Allocation | 244,000 | |||||
16(Base Project Allocation - $244,000) |
| |||||
17(xvii) Laurel Ridge State Park |
| |||||
18(A) Replace Laurel Highlands Hiking Trail |
| |||||
22Project Allocation | 1,600,000 | |||||
23(Base Project Allocation - $1,600,000) |
| |||||
24(xvii.1) Lehigh Gorge State Park |
| |||||
25(A) Replace Drake's Creek Bridge No. 0508 |
| |||||
26Project Allocation | 300,000 | |||||
27(Base Project Allocation - $300,000) |
| |||||
28(B) Repair Glen Onoko Bridge, Phase 1 |
| |||||
29Project Allocation | 300,000 | |||||
30(Base Project Allocation - $300,000) |
| |||||
1(C) Replace Bald Mountain Bridge |
| |||||
2Project Allocation | 250,000 | |||||
3(Base Project Allocation - $250,000) |
| |||||
4(xviii) Little Pine State Park |
| |||||
5(A) Rehabilitate shooting range to meet |
| |||||
8Project Allocation | 400,000 | |||||
9(Base Project Allocation - $400,000) |
| |||||
10(xviii.1) Locust Lake State Park |
| |||||
11(A) Rehabilitate sewage treatment plant |
| |||||
12Project Allocation | 300,000 | |||||
13(Base Project Allocation - $300,000) |
| |||||
14(xix) Loyalsock State Forest |
| |||||
15(A) Rehabilitate Hillsgrove Ranger |
| |||||
17Project Allocation | 525,000 | |||||
18(Base Project Allocation - $525,000) |
| |||||
19(B) Repair Pleasant Stream Road |
| |||||
20Project Allocation | 200,000 | |||||
21(Base Project Allocation - $200,000) |
| |||||
22(C) Repair Sones Pond Dam, including |
| |||||
25Project Allocation | 300,000 | |||||
26(Base Project Allocation - $300,000) |
| |||||
27(xix.1) Marsh Creek State Park |
| |||||
| ||||||
30Project Allocation | 450,000 | |||||
1(Base Project Allocation - $450,000) |
| |||||
2(xix.2) Michaux State Forest |
| |||||
3(A) Construct equipment storage building |
| |||||
4Project Allocation | 250,000 | |||||
5(Base Project Allocation - $250,000) |
| |||||
6(xix.3) Park Region 3 |
| |||||
7(A) Replace HVAC system and upgrade ADA |
| |||||
9Project Allocation | 200,000 | |||||
10(Base Project Allocation - $200,000) |
| |||||
11(xx) Moraine State Park |
| |||||
12(A) Upgrade sewage treatment plant |
| |||||
13Project Allocation | 3,500,000 | |||||
14(Base Project Allocation - $3,500,000) |
| |||||
| ||||||
17Project Allocation | 1,500,000 | |||||
18(Base Project Allocation - $1,500,000) |
| |||||
19(xxi) Nescopeck State Park |
| |||||
20(A) Construct culvert at Riley's Pond |
| |||||
21Project Allocation | 600,000 | |||||
22(Base Project Allocation - $600,000) |
| |||||
23(xxii) Nockamixon State Park |
| |||||
| ||||||
26Project Allocation | 650,000 | |||||
27(Base Project Allocation - $650,000) |
| |||||
28(B) Replace boat rental docks |
| |||||
29Project Allocation | 400,000 | |||||
30(Base Project Allocation - $400,000) |
| |||||
1(xxiii) Ohiopyle State Park |
| |||||
2(A) Repair sewage collection system and |
| |||||
5Project Allocation | 3,500,000 | |||||
6(Base Project Allocation - $3,500,000) |
| |||||
7(xxiv) Park Region 1 |
| |||||
| ||||||
10Project Allocation | 250,000 | |||||
11(Base Project Allocation - $250,000) |
| |||||
12(xxv) Presque Isle State Park |
| |||||
13(A) Provide for road flooding mitigation, |
| |||||
15Project Allocation | 400,000 | |||||
16(Base Project Allocation - $400,000) |
| |||||
| ||||||
19Project Allocation | 250,000 | |||||
20(Base Project Allocation - $250,000) |
| |||||
21(xxvi) Prince Gallitzin State Park |
| |||||
22(A) Rehabilitate Beaver Valley Marina |
| |||||
23Project Allocation | 3,000,000 | |||||
24(Base Project Allocation - $3,000,000) |
| |||||
25(xxvii) Pymatuning State Park |
| |||||
| ||||||
28Project Allocation | 500,000 | |||||
29(Base Project Allocation - $500,000) |
| |||||
30(B) Demolish sewage treatment plant at
1Linesville |
| |||||
2Project Allocation | 250,000 | |||||
3(Base Project Allocation - $250,000) |
| |||||
4(C) Rehabilitate Linesville Livery |
| |||||
5Project Allocation | 2,000,000 | |||||
6(Base Project Allocation - $2,000,000) |
| |||||
7(xxviii) Ricketts Glen State Park |
| |||||
8(A) Replace pit latrine along Route 118 |
| |||||
10Project Allocation | 400,000 | |||||
11(Base Project Allocation - $400,000) |
| |||||
12(B) Replace dam controls and outlet works |
| |||||
13Project Allocation | 800,000 | |||||
14(Base Project Allocation - $800,000) |
| |||||
15(C) Reconstruct main park road and |
| |||||
17Project Allocation | 750,000 | |||||
18(Base Project Allocation - $750,000) |
| |||||
19(xxix) Ridley Creek State Park |
| |||||
20(A) Renovate mansion kitchen |
| |||||
21Project Allocation | 250,000 | |||||
22(Base Project Allocation - $250,000) |
| |||||
23(xxx) Salt Springs State Park |
| |||||
24(A) Replace existing sanitary station |
| |||||
27Project Allocation | 437,000 | |||||
28(Base Project Allocation - $437,000) |
| |||||
29(xxxi) Shawnee State Park |
| |||||
30(A) Pave areas near and around
1campgrounds |
| |||||
2Project Allocation | 250,000 | |||||
3(Base Project Allocation - $250,000) |
| |||||
4(xxxii) Shikellamy State Park |
| |||||
5(A) Construct permanent causeway |
| |||||
6Project Allocation | 1,500,000 | |||||
7(Base Project Allocation - $1,500,000) |
| |||||
8(B) Replace Bag Nos. 6 and 7 and |
| |||||
10Project Allocation | 1,000,000 | |||||
11(Base Project Allocation - $1,000,000) |
| |||||
12(xxxiii) Sinnemahoning State Park |
| |||||
13(A) Rehabilitate dam gates operators, |
| |||||
15Project Allocation | 250,000 | |||||
16(Base Project Allocation - $250,000) |
| |||||
| ||||||
19Project Allocation | 250,000 | |||||
20(Base Project Allocation - $250,000) |
| |||||
21(xxxiv) Sproul State Forest |
| |||||
22(A) Rehabilitate Baker's Run horse |
| |||||
24Project Allocation | 250,000 | |||||
25(Base Project Allocation - $250,000) |
| |||||
26(B) Rehabilitate Baker's Run boat launch |
| |||||
28Project Allocation | 200,000 | |||||
29(Base Project Allocation - $200,000) |
| |||||
30(C) Construct Hyner hang gliding landing
1strip within park |
| |||||
2Project Allocation | 225,000 | |||||
3(Base Project Allocation - $225,000) |
| |||||
4(xxxv) Susquehannock State Park |
| |||||
5(A) Rehabilitate roads and drainage and |
| |||||
7Project Allocation | 250,000 | |||||
8(Base Project Allocation - $250,000) |
| |||||
9(xxxvi) Tiadaghton State Forest |
| |||||
10(A) Relocate Trout Run Road |
| |||||
11Project Allocation | 225,000 | |||||
12(Base Project Allocation - $225,000) |
| |||||
13(B) Construct trail bridge along Black |
| |||||
15Project Allocation | 200,000 | |||||
16(Base Project Allocation - $200,000) |
| |||||
17(xxxvi.1) Tioga State Forest |
| |||||
18(A) Upgrade to Pine Creek Trail and 287 |
| |||||
20Project Allocation | 175,000 | |||||
21(Base Project Allocation - $175,000) |
| |||||
22(xxxvii) Tobyhanna State Park |
| |||||
23(A) Pave roads throughout park |
| |||||
24Project Allocation | 350,000 | |||||
25(Base Project Allocation - $350,000) |
| |||||
26(xxxviii) Weiser State Forest |
| |||||
| ||||||
29Project Allocation | 3,300,000 | |||||
30(Base Project Allocation - $3,300,000) |
| |||||
1(xxxix) Worlds End State Park |
| |||||
2(A) Reconstruct cabin area access |
| |||||
3Project Allocation | 2,000,000 | |||||
4(Base Project Allocation - $2,000,000) |
| |||||
5(xl) Yellow Creek State Park |
| |||||
6(A) Rehabilitate beach area buildings |
| |||||
7Project Allocation | 600,000 | |||||
8(Base Project Allocation - $600,000) |
|
9Section 9. Itemization of State forestry bridge projects.
10Projects in the category of State forestry bridge projects to
11be constructed by the Department of Conservation and Natural
12Resources, its successors or assigns, and to be financed by oil
13company franchise tax revenues pursuant to 75 Pa.C.S. §
149502(a)(2)(iv) (related to imposition of tax) are hereby
15itemized, together with their respective estimated costs, as
16follows:
18Project | Total Project | |||||
19(1) Cameron County |
| |||||
20(i) Elk State Forest |
| |||||
| ||||||
23Project Allocation | 250,000 | |||||
24(Base Project Allocation - $250,000) |
| |||||
| ||||||
27Project Allocation | 250,000 | |||||
28(Base Project Allocation - $250,000) |
| |||||
29(C) Replace bridge on Naval Hollow Road |
| |||||
1Project Allocation | 150,000 | |||||
2(Base Project Allocation - $150,000) |
| |||||
3(D) Replace bridge on Ford - |
| |||||
6Project Allocation | 250,000 | |||||
7(Base Project Allocation - $250,000) |
| |||||
| ||||||
10Project Allocation | 300,000 | |||||
11(Base Project Allocation - $300,000) |
| |||||
12(F) Replace bridge on Bell Draft Road |
| |||||
14Project Allocation | 200,000 | |||||
15(Base Project Allocation - $200,000) |
| |||||
| ||||||
18Project Allocation | 150,000 | |||||
19(Base Project Allocation - $150,000) |
| |||||
20(2) Centre County |
| |||||
21(i) Moshannon State Forest |
| |||||
22(A) Replace Shirks Road over Black |
| |||||
24Project Allocation | 300,000 | |||||
25(Base Project Allocation - $300,000) |
| |||||
26(B) Replace Clay Mine Road over Six Mile |
| |||||
30Project Allocation | 700,000 | |||||
1(Base Project Allocation - $700,000) |
| |||||
2(3) Clarion County |
| |||||
3(i) Kittanning State Forest |
| |||||
4(A) Replace bridge on Corbett Road over |
| |||||
7Project Allocation | 400,000 | |||||
8(Base Project Allocation - $400,000) |
| |||||
9(4) Clearfield County |
| |||||
10(i) Moshannon State Forest |
| |||||
11(A) Replace bridge on Laurel Ridge Road |
| |||||
14Project Allocation | 650,000 | |||||
15(Base Project Allocation - $650,000) |
| |||||
| ||||||
18Project Allocation | 200,000 | |||||
19(Base Project Allocation - $200,000) |
| |||||
20(5) Clinton County |
| |||||
21(i) Sproul State Forest |
| |||||
22(A) Replace Beaver Dam Road over left |
| |||||
24Project Allocation | 400,000 | |||||
25(Base Project Allocation - $400,000) |
| |||||
26(B) Replace culvert at Little Greenlick |
| |||||
28Project Allocation | 250,000 | |||||
29(Base Project Allocation - $250,000) |
| |||||
30(C) Replace Birch Island Road over Amos
1Branch Bridge No. 10-0040 |
| |||||
2Project Allocation | 300,000 | |||||
3(Base Project Allocation - $300,000) |
| |||||
4(D) Replace State Line Road over Beauty |
| |||||
6Project Allocation | 325,000 | |||||
7(Base Project Allocation - $325,000) |
| |||||
| ||||||
10Project Allocation | 200,000 | |||||
11(Base Project Allocation - $200,000) |
| |||||
12(F) Replace bridge on Penrose Road over |
| |||||
15Project Allocation | 150,000 | |||||
16(Base Project Allocation - $150,000) |
| |||||
| ||||||
19Project Allocation | 175,000 | |||||
20(Base Project Allocation - $175,000) |
| |||||
| ||||||
23Project Allocation | 200,000 | |||||
24(Base Project Allocation - $200,000) |
| |||||
| ||||||
27Project Allocation | 175,000 | |||||
28(Base Project Allocation - $175,000) |
| |||||
29(6) Elk County |
| |||||
30(i) Elk State Forest |
| |||||
1(A) Replace Dents Run Road over Bear |
| |||||
4Project Allocation | 500,000 | |||||
5(Base Project Allocation - $500,000) |
| |||||
6(B) Replace Bridge No. 13-9025, Little |
| |||||
8Project Allocation | 200,000 | |||||
9(Base Project Allocation - $200,000) |
| |||||
10(7) Huntingdon County |
| |||||
11(i) Rothrock State Forest |
| |||||
12(A) Replace old culvert at Laurel Run |
| |||||
15Project Allocation | 100,000 | |||||
16(Base Project Allocation - $100,000) |
| |||||
17(B) Rehabilitate bridge at Crowfield Road |
| |||||
19Project Allocation | 150,000 | |||||
20(Base Project Allocation - $150,000) |
| |||||
21(C) Replace pipe culvert at Thickhead |
| |||||
23Project Allocation | 200,000 | |||||
24(Base Project Allocation - $200,000) |
| |||||
25(D) Replace three small box culverts at |
| |||||
27Project Allocation | 500,000 | |||||
28(Base Project Allocation - $500,000) |
| |||||
| ||||||
1Project Allocation | 350,000 | |||||
2(Base Project Allocation - $350,000) |
| |||||
| ||||||
5Project Allocation | 350,000 | |||||
6(Base Project Allocation - $350,000) |
| |||||
7(G) Replace bridges on Martin Gap Road 1 |
| |||||
9Project Allocation | 600,000 | |||||
10(Base Project Allocation - $600,000) |
| |||||
11(H) Replace bridge on Diamond Valley Road |
| |||||
13Project Allocation | 400,000 | |||||
14(Base Project Allocation - $400,000) |
| |||||
15(I) Replace bridge on Crowfield Road over |
| |||||
17Project Allocation | 150,000 | |||||
18(Base Project Allocation - $150,000) |
| |||||
19(J) Replace bridge on Thickhead Mountain |
| |||||
21Project Allocation | 200,000 | |||||
22(Base Project Allocation - $200,000) |
| |||||
23(K) Replace bridge on Laurel Run Road |
| |||||
25Project Allocation | 175,000 | |||||
26(Base Project Allocation - $175,000) |
| |||||
27(L) Install guiderail at seven bridges |
| |||||
28Project Allocation | 350,000 | |||||
29(Base Project Allocation - $350,000) |
| |||||
30(8) Lycoming County |
| |||||
1(i) Tiadaghton State Forest |
| |||||
| ||||||
4Project Allocation | 800,000 | |||||
5(Base Project Allocation - $800,000) |
| |||||
| ||||||
8Project Allocation | 225,000 | |||||
9(Base Project Allocation - $225,000) |
| |||||
10(C) Replace Bridge No. 16-0001 on Spoor |
| |||||
12Project Allocation | 325,000 | |||||
13(Base Project Allocation - $325,000) |
| |||||
14(ii) Tioga State Forest |
| |||||
15(A) Replace Owasse Road/Chimney Hollow |
| |||||
16Project Allocation | 175,000 | |||||
17(Base Project Allocation - $175,000) |
| |||||
18(B) Replace Cedar Mountain Road over |
| |||||
20Project Allocation | 300,000 | |||||
21(Base Project Allocation - $300,000) |
| |||||
| ||||||
24Project Allocation | 325,000 | |||||
25(Base Project Allocation - $325,000) |
| |||||
26(D) Replace Spoor Hollow Road over Norris |
| |||||
28Project Allocation | 325,000 | |||||
29(Base Project Allocation - $325,000) |
| |||||
30(E) Replace bridge on Zinck Fork Road
1over Upper Pine Bottom, No. 12-0047 |
| |||||
2Project Allocation | 250,000 | |||||
3(Base Project Allocation - $250,000) |
| |||||
4(F) Replace bridges on Slate Run Road |
| |||||
8Project Allocation | 600,000 | |||||
9(Base Project Allocation - $600,000) |
| |||||
| ||||||
12Project Allocation | 250,000 | |||||
13(Base Project Allocation - $250,000) |
| |||||
| ||||||
16Project Allocation | 325,000 | |||||
17(Base Project Allocation - $325,000) |
| |||||
18(I) Replace bridge on Lower Pine Road |
| |||||
20Project Allocation | 350,000 | |||||
21(Base Project Allocation - $350,000) |
| |||||
22(9) Monroe County |
| |||||
23(i) Delaware State Forest |
| |||||
24(A) Replace bridge on Five Mile Meadow |
| |||||
28Project Allocation | 300,000 | |||||
29(Base Project Allocation - $300,000) |
| |||||
30(B) Replace bridge on Bald Hill Road over
1unnamed creek |
| |||||
2Project Allocation | 280,000 | |||||
3(Base Project Allocation - $280,000) |
| |||||
| ||||||
6Project Allocation | 200,000 | |||||
7(Base Project Allocation - $200,000) |
| |||||
8(D) Replace Gunter Valley box culvert |
| |||||
9Project Allocation | 200,000 | |||||
10(Base Project Allocation - $200,000) |
| |||||
11(10) Perry County |
| |||||
12(i) Tuscarora State Forest |
| |||||
13(A) Replace bridge over Couch Road |
| |||||
14Project Allocation | 150,000 | |||||
15(Base Project Allocation - $150,000) |
| |||||
16(B) Replace bridge at Colonel Denning |
| |||||
18Project Allocation | 175,000 | |||||
19(Base Project Allocation - $175,000) |
| |||||
| ||||||
22Project Allocation | 200,000 | |||||
23(Base Project Allocation - $200,000) |
| |||||
| ||||||
26Project Allocation | 300,000 | |||||
27(Base Project Allocation - $300,000) |
| |||||
28(E) Replace bridge on Couch Road |
| |||||
29Project Allocation | 150,000 | |||||
30(Base Project Allocation - $150,000) |
| |||||
1(F) Replace bridge on Gunter Valley |
| |||||
2Project Allocation | 200,000 | |||||
3(Base Project Allocation - $200,000) |
| |||||
4(G) Replace bridge on access road for |
| |||||
7Project Allocation | 175,000 | |||||
8(Base Project Allocation - $175,000) |
| |||||
9(11) Potter County |
| |||||
10(i) Elk State Forest |
| |||||
11(A) Replace structures for Bridge No. 13- |
| |||||
14Project Allocation | 300,000 | |||||
15(Base Project Allocation - $300,000) |
| |||||
16(ii) Susquehannock State Forest |
| |||||
17(A) Replace Bridge No. 15-9013, Nelson |
| |||||
19Project Allocation | 200,000 | |||||
20(Base Project Allocation - $200,000) |
| |||||
21(12) Schuylkill County |
| |||||
22(i) Weiser State Forest |
| |||||
23(A) Construct a roadway and culvert over |
| |||||
26Project Allocation | 200,000 | |||||
27(Base Project Allocation - $200,000) |
| |||||
28(B) Replace White Oak Road over Wolf Run |
| |||||
30Project Allocation | 400,000 | |||||
1(Base Project Allocation - $400,000) |
| |||||
2(C) Construct culvert at Weaver Road, |
| |||||
4Project Allocation | 200,000 | |||||
5(Base Project Allocation - $200,000) |
| |||||
| ||||||
8Project Allocation | 200,000 | |||||
9(Base Project Allocation - $200,000) |
| |||||
10(E) Replace bridge on Weaver Road, Second |
| |||||
12Project Allocation | 200,000 | |||||
13(Base Project Allocation - $200,000) |
| |||||
14(F) Replace bridges on White Oak over |
| |||||
16Project Allocation | 400,000 | |||||
17(Base Project Allocation - $400,000) |
| |||||
| ||||||
20Project Allocation | 700,000 | |||||
21(Base Project Allocation - $700,000) |
| |||||
| ||||||
24Project Allocation | 200,000 | |||||
25(Base Project Allocation - $200,000) |
| |||||
26(13) Somerset County |
| |||||
27(i) Forbes State Forest |
| |||||
| ||||||
30Project Allocation | 600,000 | |||||
1(Base Project Allocation - $600,000) |
| |||||
2(B) Rehabilitate Jones Mill Run Road and |
| |||||
6Project Allocation | 600,000 | |||||
7(Base Project Allocation - $600,000) |
| |||||
8(C) Replace box culvert, bridge and |
| |||||
10Project Allocation | 800,000 | |||||
11(Base Project Allocation - $800,000) |
| |||||
12(ii) Gallitzin State Forest |
| |||||
13(A) Replace culvert at Shade Road over |
| |||||
15Project Allocation | 250,000 | |||||
16(Base Project Allocation - $250,000) |
| |||||
17(14) Sullivan County |
| |||||
18(i) Loyalsock State Forest |
| |||||
19(A) Rehabilitate Yellow Dog Road over |
| |||||
21Project Allocation | 350,000 | |||||
22(Base Project Allocation - $350,000) |
| |||||
23(B) Rehabilitate Hillsgrove Road over |
| |||||
26Project Allocation | 250,000 | |||||
27(Base Project Allocation - $250,000) |
| |||||
28(C) Replace Bridge No. 20-9011, High Knob |
| |||||
30Project Allocation | 250,000 | |||||
1(Base Project Allocation - $250,000) |
| |||||
| ||||||
4Project Allocation | 300,000 | |||||
5(Base Project Allocation - $300,000) |
| |||||
6(15) Tioga County |
| |||||
7(i) Tioga State Forest |
| |||||
8(A) Replace bridge on Cedar Mountain Road |
| |||||
10Project Allocation | 300,000 | |||||
11(Base Project Allocation - $300,000) |
| |||||
| ||||||
14Project Allocation | 175,000 | |||||
15(Base Project Allocation - $175,000) |
| |||||
16(C) Replace bridge on Spoor Hollow Road |
| |||||
18Project Allocation | 325,000 | |||||
19(Base Project Allocation - $325,000) |
| |||||
| ||||||
22Project Allocation | 325,000 | |||||
23(Base Project Allocation - $325,000) |
| |||||
24(16) Union County |
| |||||
25(i) Bald Eagle State Forest |
| |||||
| ||||||
28Project Allocation | 250,000 | |||||
29(Base Project Allocation - $250,000) |
| |||||
30(17) Westmoreland County |
| |||||
1(i) Forbes State Forest |
| |||||
2(A) Replace bridge on South Wolfe Rock |
| |||||
6Project Allocation | 600,000 | |||||
7(Base Project Allocation - $600,000) |
|
8Section 10. Itemization of State ATV/Snowmobile Fund current
9revenue projects.
10Projects in the category of State ATV/Snowmobile Fund
11projects to be constructed by the Department of Conservation and
12Natural Resources, its successors or assigns, and to be financed
13from State ATV/Snowmobile Fund current revenue are hereby
14itemized, together with their respective estimated costs, as
15follows:
17Project | Total Project |
18(1) Monroe County |
|
19(i) Delaware State Forest |
|
20(A) Construct or rehabilitate ATV trail |
|
22Project Allocation | 250,000 |
23(Base Project Allocation - $250,000) |
|
24Section 11. Itemization of Pennsylvania Fish and Boat
25Commission capital projects.
26The individual capital projects in the category of public
27improvements projects to be acquired or developed by the
28Pennsylvania Fish and Boat Commission and to be financed by the
29incurring of debt or by the current revenues of the Fish Fund
30and the Boat Fund pursuant to executive authorizations are
1hereby itemized, together with their respective estimated costs,
2as follows:
4Project | Total Project | |||||
5(1) Pennsylvania Fish and Boat Commission |
| |||||
6(i) Berks County |
| |||||
7(A) Design, permit and construct a |
| |||||
11Project Allocation | 5,063,000 | |||||
12(ii) Bucks County |
| |||||
13(A) Design, permit and construct a |
| |||||
16Project Allocation | 1,875,000 | |||||
17(iii) Cambria County |
| |||||
18(A) Design, permit and construct a |
| |||||
21Project Allocation | 1,875,000 | |||||
22(iv) Carbon County |
| |||||
23(A) Additional funds to design, permit |
| |||||
27Project Allocation | 5,625,000 | |||||
28(v) Centre County |
| |||||
29(A) Design, permit and breach Gap Dam |
| |||||
30Project Allocation | 250,000 | |||||
1(B) Additional funds to construct a dam |
| |||||
4Project Allocation | 3,140,000 | |||||
5(C) Additional funds to replace or |
| |||||
8Project Allocation | 2,375,000 | |||||
9(D) Additional funds to design, |
| |||||
13Project Allocation | 3,013,000 | |||||
14(E) Additional funds to design, |
| |||||
18Project Allocation | 5,044,000 | |||||
19(F) Additional funds to design, |
| |||||
23Project Allocation | 5,375,000 | |||||
24(vi) Columbia County |
| |||||
25(A) Additional funds to design, permit |
| |||||
29Project Allocation | 6,875,000 | |||||
30(vii) Crawford County |
| |||||
1(A) Additional funds to design, permit |
| |||||
5Project Allocation | 11,097,000 | |||||
6(viii) Cumberland County |
| |||||
7(A) Design, permit and construct a |
| |||||
10Project Allocation | 625,000 | |||||
11(B) Design, permit and construct a |
| |||||
15Project Allocation | 625,000 | |||||
16(ix) Erie County |
| |||||
17(A) Design, permit and construct a |
| |||||
20Project Allocation | 625,000 | |||||
21(B) Additional funds to design, |
| |||||
25Project Allocation | 734,000 | |||||
26(C) Design, permit and construct marina, |
| |||||
29Project Allocation | 10,625,000 | |||||
30(x) Fulton County |
| |||||
1(A) Additional funds to design, permit |
| |||||
5Project Allocation | 2,188,000 | |||||
6(xi) Indiana County |
| |||||
7(A) Additional funds to design, permit |
| |||||
11Project Allocation | 3,438,000 | |||||
12(xii) Juniata County |
| |||||
13(A) Additional funds to design, |
| |||||
17Project Allocation | 2,875,000 | |||||
18(xiii) Luzerne County |
| |||||
| ||||||
21Project Allocation | 250,000 | |||||
22(B) Design, permit and construct a |
| |||||
25Project Allocation | 313,000 | |||||
26(C) Additional funds to design, permit |
| |||||
30Project Allocation | 2,625,000 | |||||
1(xiv) Lycoming County |
| |||||
2(A) Additional funds to design, permit |
| |||||
6Project Allocation | 3,438,000 | |||||
7(xv) Northampton County |
| |||||
8(A) Additional funds to design, permit |
| |||||
12Project Allocation | 557,000 | |||||
13(xvi) Snyder County |
| |||||
14(A) Additional funds to design, permit |
| |||||
18Project Allocation | 7,688,000 | |||||
19(xvii) Somerset County |
| |||||
20(A) Additional funds to design, permit |
| |||||
24Project Allocation | 1,700,000 | |||||
25(B) Design, permit and construct a |
| |||||
28Project Allocation | 8,250,000 | |||||
29(xviii) Sullivan County |
| |||||
30(A) Design, permit and construct a
1rehabilitated dam to meet current dam |
| |||||
4Project Allocation | 1,250,000 | |||||
5(xix) Susquehanna County |
| |||||
6(A) Design, permit and construct a |
| |||||
10Project Allocation | 625,000 | |||||
11(xx) Tioga County |
| |||||
12(A) Additional funds to design, permit |
| |||||
16Project Allocation | 6,188,000 | |||||
17(xxi) Venango County |
| |||||
18(A) Additional funds to design, permit |
| |||||
22Project Allocation | 4,825,000 | |||||
23(xxii) Warren County |
| |||||
24(A) Design, permit and construct a |
| |||||
27Project Allocation | 625,000 | |||||
28(xxiii) Wayne County |
| |||||
29(A) Design, permit and construct a
1safety requirements, Douglas Pond |
| |||||
2Project Allocation | 625,000 | |||||
3(B) Design, permit and construct a |
| |||||
6Project Allocation | 625,000 | |||||
7(C) Additional funds to permit and |
| |||||
11Project Allocation | 1,188,000 | |||||
12(D) Additional funds to design, permit |
| |||||
16Project Allocation | 1,188,000 | |||||
17(E) Design, permit and construct a |
| |||||
20Project Allocation | 6,563,000 | |||||
21(F) Design, permit and construct a |
| |||||
24Project Allocation | 6,563,000 | |||||
25(xxiv) Wyoming County |
| |||||
26(A) Design, permit and construct a |
| |||||
29Project Allocation | 313,000 |
30Section 12. Itemization of Manufacturing Fund current revenue
1projects.
2The individual capital projects in the category of public
3improvement projects to be developed by the Department of
4General Services, its successors or assigns, for the Department
5of Corrections, and to be financed from current revenues of the
6Manufacturing Fund are hereby itemized, together with their
7respective estimated costs, as follows:
9Project | Total Project Allocation |
10(1) Department of Corrections |
|
11(i) State Correctional Institution at Forest |
|
12(A) Interior construction of Correctional 14correctional incentives program |
|
15Project Allocation | 7,500,000 |
16(Base Project Allocation - $6,000,000) |
|
17(Design & Contingencies - $1,500,000) |
|
18Section 13. Itemization of Oil and Gas Lease Fund capital
19projects.
20The individual capital projects in the category of public
21improvement projects to be developed by the Department of
22Conservation and Natural Resources, its successors or assigns,
23and to be financed from current revenues of the Oil and Gas
24Lease Fund are hereby itemized, together with their respective
25estimated costs, as follows:
27Project | Total Project | |||||
| ||||||
30(i) Codorus State Park |
| |||||
| ||||||
3Project Allocation | 150,000 | |||||
4(Base Project Allocation - $150,000) |
| |||||
5(ii) Ricketts Glen State Park |
| |||||
| ||||||
8Project Allocation | 548,000 | |||||
9(Base Project Allocation - $548,000) |
|
10Section 14. Itemization of Environmental Stewardship Fund
11capital projects.
12The individual projects to be developed by the Department of
13Conservation and Natural Resources, its successors or assigns,
14and to be financed from current revenues of the Environmental
15Stewardship Fund are hereby itemized, together with their
16respective estimated costs, as follows:
18Project | Total Project |
| |
21(i) Ridley Creek State Park |
|
22(A) Construct equestrian riding facility |
|
23Project Allocation | 900,000 |
24(Base Project Allocation - $900,000) |
|
<-25Section 15. Itemization of highway bridge projects.
26The individual capital projects in the category of highway
27bridge projects to be constructed by the Department of
28Transportation, its successors or assigns, and to be financed
29from current revenues or by the incurring of debt are hereby
30itemized, together with their respective estimated costs, as
1follows:
3Project | Total Project |
4(1) Northumberland County |
|
5(i) Local bridges (Reserved). |
|
6(ii) State bridges |
|
7(A) Tenth Street Bridge in Trevorton over |
|
10Project Allocation | 190,000 |
11(Base Project Allocation - $190,000) |
|
12Section 16. Provisions relating to highway bridge projects.
13(a) Limitation on expenditure of funds.--The following shall
14apply to itemizations under section 15:
15(1) Any moneys derived from the incurring of debt shall
16be used solely for effecting the rehabilitation, replacement
17or removal of bridges located on State highways. All other
18bridge rehabilitation, replacement or removal shall be
19financed from current revenue.
20(2) Notwithstanding any law to the contrary, the
21projects itemized in the act of December 8, 1982 (P.L.848,
22No.235), known as the Highway-Railroad and Highway Bridge
23Capital Budget Act for 1982-1983, may be financed from
24current revenue.
25(b) Allocation of funds.--As follows:
26(1) Whenever the Department of Transportation determines
27that the full estimated financial costs of the projects
28itemized in section 15 are not necessary for the proper
29design, acquisition or construction of such projects, the
30excess funds no longer required may be allocated by the
1Department of Transportation to increase the estimated costs
2of any one or more of the projects specifically itemized in a
3capital budget.
4(2) Moneys raised or expended by municipalities after
5the effective date of this act, in anticipation of receipt of
6funds authorized for projects itemized by this act, may be
7reimbursable to those municipalities.
8(c) Policy on jobs and materials.--As follows:
9(1) It is the declared policy of the Commonwealth that
10the construction projects authorized in section 15 be used,
11to the greatest extent possible, to provide for the creation
12of jobs and the rehiring of the unemployed in this
13Commonwealth. In order to reach this goal, firms with
14Commonwealth-based facilities shall be actively solicited to
15make bids on contracts to furnish products and materials,
16including, but not limited to, steel and steel products, to
17be used in these projects.
18(2) Every contract document entered into to undertake a
19project contained in section 15 shall provide that any steel
20or other products to be used or supplied in the performance
21of this contract shall be required to be manufactured by
22plants in the United States unless the secretary determines,
23on a contract-by-contract basis, that certain required
24products are not produced in the United States in sufficient
25quantities to meet the requirements of the contract. Such a
26determination and the reasons for the determination shall be
27published in the Pennsylvania Bulletin. Decisions made under
28this subsection shall not be inconsistent with the general
29provisions of the act of March 3, 1978 (P.L.6, No.3), known
30as the Steel Products Procurement Act.
1(3) Minorities and women.--It is also the declared
2policy of the Commonwealth to require and encourage
3substantial participation by minorities and women in the
4construction projects authorized in section 15.
5(d) Payment of capital debt service.--The repayment of any
6debt incurred pursuant to section 15 shall be made from the
7Highway Bridge Improvement Restricted Account and such repayment
8shall have first claim on the revenues of the account.
9(e) Authorization and debt cumulation.--The additional
10authorization and debt allowance provided for in section 15
11shall be added to the total authorizations and debt incurred
12pursuant to the act of December 8, 1982 (P.L.848, No.235), known
13as the Highway-Railroad and Highway Bridge Capital Budget Act
14for 1982-1983, as amended and supplemented. Section 15 shall be
15construed as a supplement to the Highway-Railroad and Highway
16Bridge Capital Budget Act for 1982-1983.
17Section <-15 17. Debt authorization.
18(a) Public improvements.--The Governor, Auditor General and
19State Treasurer are hereby authorized and directed to borrow
20from time to time in addition to any authorization heretofore or
21hereafter enacted, on the credit of the Commonwealth, subject to
22the limitations provided in the current capital budget, money
23not exceeding in the aggregate the sum of $3,572,285,000<-
24$3,897,449,000 ◄$3,977,449,000 as may be found necessary to carry
25out the acquisition and construction of the public improvement
26projects specifically itemized in a capital budget.
27(b) Furniture and equipment.--The Governor, Auditor General
28and State Treasurer are hereby authorized and directed to borrow
29from time to time in addition to any authorization heretofore or
30hereafter enacted, on the credit of the Commonwealth, subject to
1the limitations provided in the current capital budget, money
2not exceeding in the aggregate the sum of $137,620,000<-
3$138,120,000 ◄$150,120,000 as may be found necessary to carry out
4the acquisition and construction of the public improvement
5projects consisting of the acquisition of original movable
6furniture and equipment specifically itemized in a capital
7budget.
8(c) Transportation assistance.--The Governor, Auditor
9General and State Treasurer are hereby authorized and directed
10to borrow from time to time in addition to any authorization
11heretofore or hereafter enacted, on the credit of the
12Commonwealth, subject to the limitations provided in the current
13capital budget, money not exceeding in the aggregate the sum of
14$1,718,429,000 $1,823,639,000 ◄$1,846,939,000 as may be found
15necessary to carry out the acquisition and construction of the
16transportation assistance projects specifically itemized in a
17capital budget.
18(d) Redevelopment assistance.--Subject to the limitation in
19section 317(b) of the act of February 9, 1999 (P.L.1, No.1),
20known as the Capital Facilities Debt Enabling Act, the Governor,
21Auditor General and State Treasurer are hereby authorized and
22directed to borrow from time to time in addition to any
23authorization heretofore or hereafter enacted, on the credit of
24the Commonwealth, subject to the limitations provided in the
25current capital budget, money not exceeding in the aggregate the
26sum of $3,965,614,000 $6,077,447,000 ◄$6,438,618,000 as may be
27found necessary to carry out the redevelopment assistance
28capital projects specifically itemized in a capital budget.
29(e) Flood control.--The Governor, Auditor General and State
30Treasurer are hereby authorized and directed to borrow from time
1to time in addition to any authorization heretofore or hereafter
2enacted, on the credit of the Commonwealth, subject to the
3limitations provided in the current capital budget, money not
4exceeding in the aggregate the sum of $78,702,000<- $127,852,000
◄5$137,852,000 as may be found necessary to carry out the
6acquisition and construction of the flood control projects
7specifically itemized in a capital budget.
8(f) Pennsylvania Fish and Boat Commission projects.--The
9Governor, Auditor General and State Treasurer are hereby
10authorized and directed to borrow from time to time in addition
11to any authorization heretofore or hereafter enacted, on the
12credit of the Commonwealth, subject to the limitations provided
13in the current capital budget, money not exceeding in the
14aggregate the sum of $128,741,000 as may be found necessary to
15carry out the acquisition and construction of the Pennsylvania
16Fish and Boat Commission projects specifically itemized in a
17capital budget.
<-18(g) Highway bridge projects.--The Governor, Auditor General
19and State Treasurer are hereby authorized and directed to borrow
20from time to time, in addition to any authorization heretofore
21or hereafter enacted, on the credit of the Commonwealth, subject
22to the limitations provided in the current capital budget, money
23not exceeding in the aggregate the sum of $190,000 as may be
24found necessary to carry out the acquisition and construction of
25the State projects specifically itemized in a capital budget.
26Section <-16 18. Issue of bonds.
27The indebtedness authorized in this act shall be incurred
28from time to time and shall be evidenced by one or more series
29of general obligation bonds of the Commonwealth in such
30aggregate principal amount for each series as the Governor, the
1Auditor General and the State Treasurer shall determine, but the
2latest stated maturity date shall not exceed estimated useful
3life of the projects being financed as stated in section <-14 19.
4Section <-17 19. Estimated useful life and term of debt.
5(a) Estimated useful life.--The General Assembly states that
6the estimated useful life of the public improvement projects
7itemized in this act is as follows:
8(1) Public improvement projects, 30 years.
9(2) Furniture and equipment projects, 10 years.
10(3) Transportation assistance projects:
11(i) Rolling stock, 15 years.
12(ii) Passenger buses, 12 years.
13(iii) Furniture and equipment, 10 years.
14(iv) All others, 30 years.
15(b) Term of debt.--The maximum term of the debt authorized
16to be incurred under this act is 30 years.
17Section <-18 20. Appropriations.
18(a) Public improvements.--The net proceeds of the sale of
19the obligations authorized in this act are hereby appropriated
20from the Capital Facilities Fund to the Department of General
21Services in the maximum amount of <-$3,572,285,000 $3,897,449,000
<-22$3,977,449,000 to be used by it exclusively to defray the
23financial cost of the public improvement projects specifically
24itemized in a capital budget. After reserving or paying the
25expenses of the sale of the obligation, the State Treasurer
26shall pay to the Department of General Services the moneys as
27required and certified by it to be legally due and payable.
28(b) Furniture and equipment.--The net proceeds of the sale
29of the obligations authorized in this act are hereby
30appropriated from the Capital Facilities Fund to the Department
1of General Services in the maximum amount of $137,620,000<-
2$138,120,000 $150,120,000<- to be used by it exclusively to defray
3the financial cost of the public improvement projects consisting
4of the acquisition of original movable furniture and equipment
5specifically itemized in a capital budget. After reserving or
6paying the expenses of the sale of the obligation, the State
7Treasurer shall pay to the Department of General Services the
8moneys as required and certified by it to be legally due and
9payable.
10(c) Transportation assistance.--The net proceeds of the sale
11of the obligations authorized in this act are hereby
12appropriated from the Capital Facilities Fund to the Department
13of Transportation in the maximum amount of $1,718,429,000<-
14$1,<-823,639,000 $1,846,939,000 to be used by it exclusively to
15defray the financial cost of the transportation assistance
16projects specifically itemized in a capital budget. After
17reserving or paying the expenses of the sale of the obligation,
18the State Treasurer shall pay to the Department of
19Transportation the moneys as required and certified by it to be
20legally due and payable.
21(d) Redevelopment assistance.--The net proceeds of the sale
22of the obligations authorized in this act are hereby
23appropriated from the Capital Facilities Fund to the Department
24of Community and Economic Development in the maximum amount of
<-25$3,965,614,000 $6,077,447,000 $6,438,618,000 to be used by it
26exclusively to defray the financial cost of the redevelopment
27assistance capital projects specifically itemized in a capital
28budget. After reserving or paying the expenses of the sale of
29the obligation, the State Treasurer shall pay to the Department
30of Community and Economic Development the moneys as required and
1certified by it to be legally due and payable.
2(e) Flood control.--The net proceeds of the sale of the
3obligations authorized in this act are hereby appropriated from
4the Capital Facilities Fund to the Department of Environmental
5Protection in the maximum amount of <-$78,702,000 $127,852,000
6$137,852,000 to be used by it exclusively to defray the
7financial cost of the flood control projects specifically
8itemized in a capital budget. After reserving or paying the
9expenses of the sale of the obligation, the State Treasurer
10shall pay to the Department of Environmental Protection the
11moneys as required and certified by it to be legally due and
12payable.
13(f) Pennsylvania Fish and Boat Commission projects.--The net
14proceeds of the sale of the obligations authorized in this act
15are hereby appropriated from the Capital Facilities Fund to the
16Pennsylvania Fish and Boat Commission in the maximum amount of
17$128,741,000 to be used by it exclusively to defray the
18financial cost of the Pennsylvania Fish and Boat Commission
19projects specifically itemized in a capital budget. After
20reserving or paying the expenses of the sale of the obligation,
21the State Treasurer shall pay to the Pennsylvania Fish and Boat
22Commission the moneys as required and certified by it to be
23legally due and payable.
<-24(g) Highway bridge projects.--The net proceeds of the sale
25of the obligations authorized in this act are hereby
26appropriated from the Capital Facilities Fund to the Department
27of Transportation in the maximum amount of $190,000 to be used
28by it exclusively to defray the financial costs of the highway
29bridge projects specifically itemized in this capital budget.
30After reserving or paying the expenses of the sale of the
1obligation, the State Treasurer shall pay out to the department
2the moneys as required and certified by it to be legally due and
3payable.
4Section <-19 21. Federal funds.
5(a) Projects itemized in this act.--In addition to those
6funds appropriated in section <-18 20, all moneys received from
7the Federal Government for the projects specifically itemized in
8this act are also hereby appropriated for those projects.
9(b) Projects not requiring itemization.--Department of
10Military and Veterans Affairs construction projects which are
11totally federally funded but which are to be administered by the
12Department of General Services are hereby authorized.
13Section <-20 22. Editorial changes.
14In editing and preparing this act for printing following the
15final enactment, the Legislative Reference Bureau shall insert
16or revise letters or numbers for projects where the letters or
17numbers are missing or require revision. The bureau shall also
18revise the total monetary amounts for the total authorization,
19debt authorization, appropriations and departmental totals as
20necessary to agree with the total monetary amounts of the
21projects.
22Section <-21 23. Effective date.
23This act shall take effect immediately.