20100082ua

AN ACT

 

Providing for the capital budget for the fiscal year 2010-2011; itemizing public improvement projects, furniture and equipment projects, transportation assistance projects, redevelopment assistance capital projects, flood control projects, Keystone Recreation, Park and Conservation Fund projects, Environmental Stewardship Fund projects, State forestry bridge projects, General Fund current revenue projects, State ATV/Snowmobile Fund projects, State transportation enhancement funds projects and State Stores Fund current revenue projects to be constructed or acquired or assisted by the Department of General Services, the Department of Community and Economic Development, the Department of Conservation and Natural Resources or the Department of Transportation, together with their estimated financial costs; authorizing the incurring of debt without the approval of the electors for the purpose of financing the projects to be constructed, acquired or assisted by the Department of General Services, the Department of Community and Economic Development, the Department of Conservation and Natural Resources, the Department of Environmental Protection or the Department of Transportation; stating the estimated useful life of the projects; providing an exemption; providing for limitation on certain capital projects; making appropriations; and making a repeal.

 

The General Assembly of the Commonwealth of Pennsylvania hereby enacts as follows:

 

20100082u1s

Section 1.  Short title.

This act shall be known and may be cited as the Capital Budget Project Itemization Act of 2010-2011.

20100082u2s

Section 2.  Total authorizations.

(a)  Public improvements.--The total authorization for the additional capital projects in the category of public improvement projects itemized in section 3 and to be acquired or constructed by the Department of General Services, its successors or assigns and to be financed by the incurring of debt shall be $3,839,809,000.

(b)  Furniture and equipment.--The total authorization for the additional capital projects in the category of public improvement projects consisting of the acquisition of original movable furniture and equipment to complete public improvement projects itemized in section 4 and to be acquired by the Department of General Services, its successors or assigns and to be financed by the incurring of debt shall be $194,321,000.

(c)  Transportation assistance.--The total authorization for the capital projects in the category of transportation assistance projects itemized in section 5 with respect to which an interest is to be acquired in or constructed by the Department of Transportation, its successors or assigns and to be financed by the incurring of debt shall be $1,041,742,500.

(d)  Redevelopment assistance.--The total authorization for the additional capital projects in the category of redevelopment assistance capital projects itemized in section 6 for capital grants by the Department of Community and Economic Development, its successors or assigns and to be financed by the incurring of debt shall be $7,375,792,000.

(e)  Flood control.--The total authorization for the capital projects in the category of flood control projects itemized in section 7 and to be constructed by the Department of Environmental Protection, its successors or assigns and to be financed by the incurring of debt, shall be $80,445,000.

(f)  Keystone Recreation, Park and Conservation Fund.--The total authorization for the capital projects in the category of public improvement projects itemized in section 8 and to be constructed by the Department of Conservation and Natural Resources, its successors or assigns and to be financed from current revenues in the Keystone Recreation, Park and Conservation Fund shall be $51,825,000.

(g)  Environmental Stewardship Fund projects.--The total authorization for the capital projects in the category of public improvement projects itemized in section 9 and to be constructed by the Department of Conservation and Natural Resources, its successors or assigns and to be financed from current revenues in the Environmental Stewardship Fund shall be $20,050,000.

(h)  State forestry bridge projects.--The total authorization for the capital projects itemized in section 10 to be constructed by the Department of Conservation and Natural Resources, its successors or assigns and to be financed by oil company franchise tax revenues pursuant to 75 Pa.C.S. § 9502(a)(2)(iv) (relating to imposition of tax) shall be $11,605,000.

(i)  General Fund current revenue projects.--The total authorization for the capital projects in the category of public improvement projects itemized in section 11 and to be developed or constructed by the Department of General Services, its successors or assigns and to be financed from current revenues in the General Fund shall be $24,150,000.

(j)  State ATV/snowmobile projects.--The total authorization for the capital projects itemized in section 12 to be constructed by the Department of Conservation and Natural Resources, its successors or assigns and to be financed from current revenues in the State ATV/Snowmobile Fund shall be  $300,000.

(k)  State transportation enhancement projects.--The total authorization for the capital projects itemized in section 13 to be constructed by the Department of Conservation and Natural Resources, its successors and assigns and to be financed from current revenues from State transportation enhancement funds shall be $5,000,000.

(l)  State Stores Fund current revenue projects.--The total authorization for the capital projects in the category of public improvement projects itemized in section 14 and to be developed by the Department of General Services, its successors or assigns for the Pennsylvania Liquor Control Board and to be financed from the current revenues of the State Stores Fund shall be $552,000.

20100082u3s

Section 3.  Itemization of public improvement capital projects.

Additional capital projects in the category of public improvement projects to be constructed or acquired by the Department of General Services, its successors or assigns and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:

 

Project

Total Project Allocation

(1)  Department of Agriculture

 

(i)  Department Headquarters

 

(A)  Replace high voltage switchgear and related components

 

Project Allocation

2,000,000

(Base Project Allocation - $1,800,000)

 

(Design and Contingencies - $200,000)

 

(ii)  Agricultural Building

 

(A)  Construct new plant industry laboratory wing attached to current building for diagnostic testing

 

 

Project Allocation

10,000,000

(Base Project Allocation - $9,000,000)

 

(Design and Contingencies - $1,000,000)

 

(iii)  Farm Show Complex

 

(A)  Upgrade Farm Show Complex facilities, including HVAC, surveillance system, renewable energy equipment, roadway access, flooding and public restrooms

 

Project Allocation

12,000,000

(Base Project Allocation - $10,800,000)

 

(Design and Contingencies - $1,200,000)

 

(B)  Modify and construct administrative office space for staff in the Farm Show Complex

 

Project Allocation

5,000,000

(Base Project Allocation - $4,500,000)

 

(Design and Contingencies - $500,000)

 

(iv)  Pennsylvania Animal Diagnostic Laboratory System

 

(A)  Construct a new Pennsylvania Animal Health Diagnostic Laboratory (PADLS) with Bio-Safety Level 3 capabilities to support PADLS at The Pennsylvania State University

 

Project Allocation

33,000,000

(Base Project Allocation - $29,700,000)

 

(Design and Contingencies - $3,300,000)

 

(B)  Construct a new Pennsylvania Animal Health Diagnostic Laboratory (PADLS) with Bio-Safety Level 3 capabilities to support PADLS at New Bolton Center

 

Project Allocation

29,000,000

(Base Project Allocation - $26,100,000)

 

(Design and Contingencies - $2,900,000)

 

(v)  Pennsylvania Fairs

 

(A)  Renovate and upgrade facilities at various fair sites throughout this Commonwealth

 

Project Allocation

2,000,000

(Base Project Allocation - $1,800,000)

 

(Design and Contingencies - $200,000)

 

(vi)  State Farms

 

(A)  Renovate and upgrade State Farm in Berks County, including structural repairs, electrical, plumbing and roofing

 

Project Allocation

5,000,000

(Base Project Allocation - $4,500,000)

 

(Design and Contingencies - $500,000)

 

(B)  Renovate and upgrade State Farm in Snyder County, including structural repairs, electrical, plumbing and roofing

 

Project Allocation

5,000,000

(Base Project Allocation - $4,500,000)

 

(Design and Contingencies - $500,000)

 

(vii)  State Dairy Farm

 

(A)  Enhance operation of dairy farm incubator project on grounds of DGS Annex

 

Project Allocation

500,000

(Base Project Allocation - $450,000)

 

(Design and Contingencies - $50,000)

 

(2)  Department of Conservation and Natural Resources

 

 

(i)  Black Moshannon State Park

 

(A)  Develop ten additional modern family cabins, including construction, vehicle access, circulation and infrastructure

 

Project Allocation

3,000,000

(Base Project Allocation - $2,400,000)

 

(Design and Contingencies - $600,000)

 

(ii)  Chapman State Park

 

(A)  Rehabilitate dam

 

Project Allocation

15,000,000

(Base Project Allocation - $12,000,000)

 

(Design and Contingencies - $3,000,000)

 

(iii)  Codorus State Park

 

(A)  Develop ten additional modern family cabins, including construction, vehicle access, circulation and infrastructure

 

Project Allocation

3,000,000

(Base Project Allocation - $2,400,000)

 

(Design and Contingencies - $600,000)

 

(iv)  Cook Forest State Park

 

(A)  Replace pit latrines with modern flush facilities, including infrastructure

 

Project Allocation

1,281,000

(Base Project Allocation - $1,081,000)

 

(Design and Contingencies - $200,000)

 

(v)  Delaware Canal State Park

 

(A)  Rehabilitate historic Delaware Canal from Easton to Bristol

 

Project Allocation

3,000,000

(Base Project Allocation - $2,400,000)

 

(Design and Contingencies - $600,000)

 

(vi)  Forest District 3

 

(A)  Rehabilitate and repair Gunther Valley Dam

 

Project Allocation

9,000,000

(Base Project Allocation - $7,500,000)

 

(Design and Contingencies - $1,500,000)

 

(vii)  Forest District 6

 

(A)  Construct new forest district office, including infrastructure

 

Project Allocation

6,000,000

(Base Project Allocation - $4,800,000)

 

(Design and Contingencies - $1,200,000)

 

(viii)  Forest District 10

 

(A)  Construct connector road and bridge between Bloody Skillet recreational ATV trail and township road, Litke Tract

 

Project Allocation

4,000,000

(Base Project Allocation - $3,200,000)

 

(Design and Contingencies - $800,000)

 

(ix)  Forest District 18

 

(A)  Construct rest facilities and parking lots, rehabilitate public multiple use trail/administrative roads, refurbish living quarters as departmental training facility and purchase maintenance equipment

 

Project Allocation

3,000,000

(Base Project Allocation - $2,400,000)

 

(Design and Contingencies - $600,000)

 

(x)  Kettle Creek State Park

 

(A)  Dredge lake around Kettle Creek Reservoir to improve quality recreational opportunities

 

Project Allocation

2,000,000

(Base Project Allocation - $1,600,000)

 

(Design and Contingencies - $400,000)

 

(xi)  Kinzua Bridge State Park

 

(A)  Develop park facilities, including day-use and overnight facilities

 

Project Allocation

3,000,000

(Base Project Allocation - $2,400,000)

 

(Design and Contingencies - $600,000)

 

(xii)  Lackawanna State Park

 

(A)  Develop overnight family cabin colony, including infrastructure

 

Project Allocation

3,000,000

(Base Project Allocation - $2,400,000)

 

(Design and Contingencies - $600,000)

 

(xiii)  Laurel Hill State Park

 

(A)  Rehabilitate seven organized group camps, including water, sewer, utility upgrades, mess hall rehabilitation, roof replacement, parking, trails, masonry work and window and door replacements

 

Project Allocation

4,000,000

(Base Project Allocation - $3,200,000)

 

(Design and Contingencies - $800,000)

 

(B)  Develop overnight family cabin colony, including infrastructure

 

Project Allocation

3,000,000

(Base Project Allocation - $2,400,000)

 

(Design and Contingencies - $600,000)

 

(xiii.1)  Lehigh Gorge State Park

 

(A)  Additional funds to acquire land necessary to complete the scheme for the park in conformance with the Statewide recreation plan

 

Project Allocation

1,500,000

(xiv)  Little Buffalo State Park

 

(A)  Rehabilitate recently acquired family campground to meet State park standards

 

Project Allocation

2,500,000

(Base Project Allocation - $2,000,000)

 

(Design and Contingencies - $500,000)

 

(xv)  Little Pine State Park

 

(A)  Dredge Little Pine Lake

 

Project Allocation

7,500,000

(Base Project Allocation - $6,000,000)

 

(Design and Contingencies - $1,500,000)

 

(xvi)  Nescopeck State Park

 

(A)  Develop group camping facilities at new 2,981-acre section, including overnight facilities and infrastructure

 

Project Allocation

2,000,000

 (Base Project Allocation - $1,600,000)

 

 (Design and Contingencies - $400,000)

 

(B)  Develop overnight family cabin colony, including infrastructure

 

Project Allocation

3,000,000

(Base Project Allocation - $2,400,000)

 

(Design and Contingencies - $600,000)

 

(xvii)  Ohiopyle State Park

 

(A)  Develop overnight family cabin colony, including infrastructure

 

Project Allocation

3,000,000

(Base Project Allocation - $2,400,000)

 

(Design and Contingencies - $600,000)

 

(xvii.1)  Oil Creek State Park

 

(A)  Infrastructure, construction and other costs related to a three-mile extension of paved bike trail

 

Project Allocation

1,750,000

(B)  Construct Missing Link bike trail in the southern portion

 

Project Allocation

300,000

(xviii)  Promised Land State Park

 

(A)  Upgrades to campsite and other amenities, including construction and other infrastructure

 

Project Allocation

1,600,000

(xix)  Pymatuning State Park

 

(A)  Develop new and improved trail system to meet current standards

 

Project Allocation

2,000,000

(Base Project Allocation - $1,600,000)

 

(Design and Contingencies - $400,000)

 

(xx)  Shikellamy State Park

 

(A)  Construction, infrastructure, acquisition and redevelopment costs for the expansion of Shikellamy State Park

 

Project Allocation

10,000,000

(xxi)  Sinnemahoning State Park

 

(A)  Rehabilitate dam and dredge George B. Stevens Lake

 

Project Allocation

5,000,000

(Base Project Allocation - $4,000,000)

 

(Design and Contingencies - $1,000,000)

 

(B)  Replace park maintenance facility and forest district 13 maintenance building, including infrastructure

 

Project Allocation

3,000,000

(Base Project Allocation - $2,400,000)

 

(Design and Contingencies - $600,000)

 

(xxii)  Yellow Creek State Park

 

(A)  Develop ten additional modern family cabins, including construction, vehicle access, circulation and infrastructure

 

Project Allocation

3,000,000

(Base Project Allocation - $2,400,000)

 

(Design and Contingencies - $600,000)

 

(xxiii)  Multiple State Parks and Forests, Statewide

 

(A)  Replace or rehabilitate forest fire lookout towers

 

Project Allocation

6,000,000

(Base Project Allocation - $4,800,000)

 

(Design and Contingencies - $1,200,000)

 

(xxiv)  Erie County

 

(A)  Construction, infrastructure and other related costs for park renovations in Millcreek Township

 

Project Allocation

5,000,000

(3)  Department of Corrections

 

(i)  Department of Corrections

 

(A)  Purchase of eight modular housing units at the following State correctional institutions - Cambridge Springs, Greensburg, Houtzdale, Laurel Highlands, Mahanoy, Pine Grove and Rockview (2) - which were constructed using proceeds from the 2009 certificates of participation

 

Project Allocation

23,000,000

(i.1)  Elizabethtown Training Academy

 

(A)  Replace roof on Elder Hall

 

Project Allocation

2,200,000

(Base Project Allocation - $1,760,000)

 

(Design and Contingencies - $440,000)

 

(i.2)  Quehanna Motivational Boot Camp

 

(A)  Replace existing rubber roof, add insulation and provide sloping for drainage for Building D

 

Project Allocation

1,200,000

(Base Project Allocation - $960,000)

 

(Design and Contingencies - $240,000)

 

(i.3)  State Correctional Institution at Albion

 

(A)  Restore water tank, including sandblasting, repair, cleaning and repainting the interior surface of the water tank, replacing the cathodic protection system and providing a means, such as a bypass pump and pressurization tank, to maintain water pressure and flow from the township for the duration of the project

 

Project Allocation

600,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $100,000)

 

(i.4)  State Correctional Institution at Cambridge Springs

 

(A)  Build new gymnasium and chapel with multipurpose rooms to support treatment programs

 

Project Allocation

2,000,000

(Base Project Allocation - $1,600,000)

 

(Design and Contingencies - $400,000)

 

(B)  Construct addition to dietary building to support future requirements

 

Project Allocation

2,300,000

(Base Project Allocation - $1,840,000)

 

(Design and Contingencies - $460,000)

 

(ii)  State Correctional Institution at Chester

 

(A)  Replace buried perimeter intrusion system around entire perimeter of institution

 

Project Allocation

1,200,000

(Base Project Allocation - $960,000)

 

(Design and Contingencies - $240,000)

 

(ii.1)  State Correctional Institution at Coal Township

 

(A)  Additional funds for DGS Project 375-1, replacement of hot/chilled water loop system, including replacing chillers, rebuilding cooling towers, replacing penthouse piping and adding glycol

 

Project Allocation

3,500,000

(Base Project Allocation - $2,800,000)

 

(Design and Contingencies - $700,000)

 

(iii)  State Correctional Institution at Cresson

 

(A)  Design new kitchen and loading dock to serve expanded inmate population

 

Project Allocation

2,300,000

(Base Project Allocation - $1,840,000)

 

(Design and Contingencies - $460,000)

 

(iv)  State Correctional Institution at Dallas

 

(A)  Replace all steam lines and valves, including exposed and buried, throughout the institution

 

Project Allocation

2,500,000

(Base Project Allocation - $2,000,000)

 

(Design and Contingencies - $500,000)

 

(B)  Lease and/or purchase an emergency housing facility, including related infrastructure improvements

 

Project Allocation

3,500,000

(Base Project Allocation - $3,500,000)

 

(iv.1)  New State Correctional Institution in Fayette County

 

(A)  Additional funds for DGS Project 1581-1, including construction of a new 2,000-bed L-3 medium security prison in Fayette County and all other facilities as necessary to operate institution

 

Project Allocation

30,000,000

(Base Project Allocation - $24,000,000)

 

(Design and Contingencies - $6,000,000)

 

(v)  State Correctional Institution at Forest

 

(A)  Lease and/or purchase an emergency housing facility, including related infrastructure improvements

 

Project Allocation

3,500,000

(Base Project Allocation - $3,500,000)

 

(vi)  State Correctional Institution at Frackville

 

(A)  Replace buried perimeter intrusion system around entire perimeter of the institution

 

Project Allocation

750,000

(Base Project Allocation - $600,000)

 

(Design and Contingencies - $150,000)

 

(vii)  State Correctional Institution at Graterford

 

(A)  Additional funds for DGS Project 577-35, construct new roadway to access SCI Graterford off Route 73, Phase 2, completion of new access roadway into the institution due to the closing of SR 73 bridge and site road updates

 

 

Project Allocation

5,000,000

(Base Project Allocation - $4,000,000)

 

(Design and Contingencies - $1,000,000)

 

(B)  Additional funds for DGS Project 577-36, construct a new 2,000-bed L-3 medium security prison on the grounds of SCI Graterford, including infrastructure and road work to incorporate the two facilities at this site

 

Project Allocation

25,000,000

(Base Project Allocation - $20,000,000)

 

(Design and Contingencies - $5,000,000)

 

(C)  Additional funds for DGS Project 577-37, construct a new L-4 close security prison with up to 2,100 beds on the grounds of SCI Graterford, including necessary infrastructure and road work

 

Project Allocation

25,000,000

(Base Project Allocation - $20,000,000)

 

(Design and Contingencies - $5,000,000)

 

(viii)  State Correctional Institution at Greene

 

(A)  Replace perimeter intrusion system around entire perimeter of the institution

 

Project Allocation

1,200,000

(Base Project Allocation - $960,000)

 

(Design and Contingencies - $240,000)

 

(ix)  State Correctional Institution at Huntingdon

 

(A)  Upgrade security fence, windows, grills and cell doors and expand control center

 

Project Allocation

2,000,000

(Base Project Allocation - $1,600,000)

 

(Design and Contingencies - $400,000)

 

(B)  Replace electrical service into blocks and cells which are insufficient to meet requirements

 

Project Allocation

3,200,000

(Base Project Allocation - $2,560,000)

 

(Design and Contingencies - $640,000)

 

(x)  State Correctional Institution at Laurel Highlands

 

(A)  Replace roof with combination of rubber and standing seam metal roof, including a hatch to access the roof from inside the building

 

Project Allocation

750,000

(Base Project Allocation - $600,000)

 

(Design and Contingencies - $150,000)

 

(xi)  State Correctional Institution at Mahanoy

 

(A)  Replace boilers and related equipment in Building 4 to tie into existing equipment and remove back-up boiler

 

Project Allocation

2,200,000

(Base Project Allocation - $1,760,000)

 

(Design and Contingencies - $440,000)

 

(xii)  State Correctional Institution at Mercer

 

(A)  Replace perimeter intrusion system around entire perimeter of the institution

 

Project Allocation

1,200,000

(Base Project Allocation - $960,000)

 

(Design and Contingencies - $240,000)

 

(xiii)  State Correctional Institution at Muncy

 

(A)  Additional funds for DGS Project 574-26, including funds for addition of two new cell blocks for close security, expansion of infirmary, outside warehouse, electrical and boiler upgrades, utility upgrades and kitchen and dining room expansion

 

Project Allocation

4,300,000

(Base Project Allocation - $3,440,000)

 

(Design and Contingencies - $860,000)

 

(xiv)  State Correctional Institution at Retreat

 

(A)  Replace buried perimeter intrusion system around entire perimeter of the institution

 

Project Allocation

1,000,000

(Base Project Allocation - $800,000)

 

(Design and Contingencies - $200,000)

 

(xv)  State Correctional Institution at Rockview

 

(A)  Replace the Del Norte perimeter intrusion system around entire perimeter of the institution

 

Project Allocation

1,092,000

(Base Project Allocation - $874,000)

 

(Design and Contingencies - $218,000)

 

(B)  Repair or replace exterior on numerous buildings throughout the institution

 

Project Allocation

2,100,000

(Base Project Allocation - $1,680,000)

 

(Design and Contingencies - $420,000)

 

(C)  Additional funds for DGS Project 571-31, construct a new 2,000-bed L-3 medium security prison on the grounds of SCI Rockview, including infrastructure and road work to complete the two facilities at this site

 

Project Allocation

30,000,000

(Base Project Allocation - $24,000,000)

 

(Design and Contingencies - $6,000,000)

 

(xvi)  State Correctional Institution at Smithfield

 

(A)  Additional funding for DGS Project 1573-10, renovation of boiler plant, for current boilers to meet EPA air quality standards

 

Project Allocation

3,000,000

(Base Project Allocation - $2,400,000)

 

(Design and Contingencies - $600,000)

 

(xvii)  State Correctional Institution at Somerset

 

(A)  Replace roofs on various buildings throughout the institution

 

Project Allocation

2,800,000

(Base Project Allocation - $2,240,000)

 

(Design and Contingencies - $560,000)

 

(B)  Lease and/or purchase an emergency housing facility, including related infrastructure improvements

 

Project Allocation

3,500,000

(Base Project Allocation - $3,500,000)

 

(xviii)  State Correctional Institution at Waymart

 

(A)  Replace current lines and steam traps in housing basement

 

Project Allocation

3,640,000

(Base Project Allocation - $2,912,000)

 

(Design and Contingencies - $728,000)

 

(B)  Provide additional funding for DGS Project 1578-7, renovate boiler plant

 

Project Allocation

4,000,000

(Base Project Allocation - $3,200,000)

 

(Design and Contingencies - $800,000)

 

(4)  Department of Education

 

(i)  Allegany College of Maryland, Bedford campus

 

(A)  Construction of new facility and capital improvements to existing facility, including infrastructure and other related costs

 

Project Allocation

5,750,000

(i.1)  Bucks County Community College

 

(A)  Infrastructure, site development, construction and other costs related to the construction of a state-of-the-art public safety training facility, including a "burn building" and educational facility

 

Project Allocation

2,000,000

(B)  Building renovations, security upgrades and renovations and energy-efficient renovations and upgrades to the Newtown campus

 

Project Allocation

2,100,000

(ii)  Butler County Community College

 

(A)  Construction, redevelopment and other related costs for Linden Pointe campus improvements

 

Project Allocation

525,000

(B)  Infrastructure, construction and renovations to the Beck Library and Learning Resource Center

 

Project Allocation

2,000,000

(ii.1)  Community College of Allegheny County

 

(A)  Acquisition, construction, renovation, site development and other improvements for Boyce campus

 

Project Allocation

1,700,000

(B)  Construction, renovation, infrastructure and other costs related to West Hall

 

Project Allocation

3,000,000

(C)  Construction of a North Hills campus facility

 

Project Allocation

52,000,000

(iii)  Community College of Beaver

 

(A)  Construction of an air traffic control tower simulation library, including related costs

 

Project Allocation

2,000,000

(iii.1)  Department of Education Headquarters

 

(A)  Improve and upgrade three floors of the Department of Education headquarters building at 333 Market Street, Harrisburg

 

Project Allocation

1,500,000

(Base Project Allocation - $1,200,000)

 

(Design and Contingencies - $300,000)

 

(iv)  Erie Community College

 

(A)  Construction of the Erie Community College, including related costs

 

Project Allocation

11,000,000

(iv.1)  Harrisburg Area Community College

 

(A)  Renovations and expansion to the Wildwood campus

 

Project Allocation

20,000,000

(B)  Construction of a new Wellness and Physical Education Center at Harrisburg campus

 

Project Allocation

10,000,000

(C)  Phase II of the expansion of the Shumaker Public Safety Center at Harrisburg campus

 

Project Allocation

10,000,000

(D)  Acquisition, infrastructure, rehabilitation, construction and other related costs for an administrative office building for Central Administration

 

Project Allocation

10,000,000

(E)  Construction of remaining enclosed space for additional classrooms at Gettysburg campus

 

Project Allocation

6,600,000

(F)  Acquisition of adjacent building, demolition, construction and other related costs for additional parking space at Gettysburg campus

 

Project Allocation

2,000,000

(G)  Retrofit older section of building with geothermal system replacing aging rooftop units to promote sustainability and meet LEED standards at Gettysburg campus

 

Project Allocation

2,000,000

(H)  Costs related to a safety study, installation of traffic signal and other improvements to egress from campus at Gettysburg campus

 

Project Allocation

1,000,000

(I)  Student Affairs/Welcome Center renovations at Lancaster campus

 

Project Allocation

3,500,000

(J)  Land acquisition and other costs related to additional parking at Lancaster campus

 

Project Allocation

1,000,000

(K)  Student Center addition at Lancaster campus

 

Project Allocation

27,800,000

(L)  Costs related to renovations to the first and second floors at Lebanon campus

 

Project Allocation

3,007,000

(M)  Construction of a building for a learning center, library and information technology at York campus

 

Project Allocation

5,000,000

(N)  Acquisition of land and building for the development of the York campus

 

Project Allocation

15,000,000

(O)  Renovations to Cytec building at York campus

 

Project Allocation

7,000,000

(v)  Lehigh Carbon Community College

 

(A)  Construction, infrastructure and other related costs for the Carbon site

 

Project Allocation

4,000,000

(B)  Construction of a veterinary technology lab and veterinary clinic in cooperation with the Lehigh Valley Zoo

 

Project Allocation

2,500,000

(C)  Construction of a Communiversity Center for Lehigh Carbon Community College, including related costs

 

Project Allocation

1,300,000

(D)  Infrastructure, rehabilitation and renovations to the Administration Building

 

Project Allocation

2,000,000

(vi)  Lincoln University

 

(A)  Completely renovate Vail Hall to meet modern needs, including ADA requirements, HVAC, security system and electronic access

 

Project Allocation

15,000,000

(Base Project Allocation - $12,000,000)

 

(Design and Contingencies - $3,000,000)

 

(B)  Renovate Lincoln Hall to accommodate public relations/communications and human resources departments

 

Project Allocation

20,000,000

(Base Project Allocation - $16,000,000)

 

(Design and Contingencies - $4,000,000)

 

(C)  Renovate and expand Azikiwe-Nkrumah Hall to house Department of Public Safety and Security and University Visitors Information Center

 

Project Allocation

7,000,000

(Base Project Allocation - $5,600,000)

 

(Design and Contingencies - $1,400,000)

 

(D)  Renovate Cresson Hall to meet modern needs, including ADA requirements, HVAC, security system and electronic access

 

Project Allocation

20,000,000

(Base Project Allocation - $16,000,000)

 

(Design and Contingencies - $4,000,000)

 

(E)  New construction of a state-of-the-art social sciences building to house the Department of Business Administration, the Department of Education and a Laboratory Demonstration School

 

Project Allocation

40,000,000

(F)  Renovate and expand Amos Hall for the Information Technology Center and Museum use

 

Project Allocation

15,000,000

(G)  New construction of a physical plant facility to house plant operations, staff and for storing and maintaining physical plant supplies and equipment

 

Project Allocation

15,000,000

(H)  Furniture, fixtures and equipment for the new social sciences building

 

Project Allocation

6,000,000

(I)  Furniture, fixtures and equipment for the renovation and expansion of Amos Hall

 

Project Allocation

4,000,000

(J)  Furniture, fixtures and equipment for the construction of additional tennis courts, softball field, soccer field and bleachers to support track and soccer fields

 

Project Allocation

4,000,000

(vi.1)  Luzerne County Community College

 

(A)  Construction, renovation, infrastructure and other related costs for the Luzerne County Community College main campus in Nanticoke

 

Project Allocation

5,199,000

(B)  Construction, renovation, infrastructure and other related costs for the Luzerne County Community College Public Safety Training Institute

 

Project Allocation

2,500,000

(C)  Construction, renovation, infrastructure and other related costs for the Luzerne County Community College Health Sciences Center

 

Project Allocation

400,000

(vii)  (Reserved)

 

(viii)  Temple University

 

(A)  Renovate an existing building with dedicated learning space, faculty and administration of the Honors Program

 

Project Allocation

30,000,000

(Base Project Allocation - $24,000,000)

 

(Design and Contingencies - $6,000,000)

 

(B)  Land acquisition, construction, redevelopment and renovation necessary for the Medical School of Temple University and St. Luke's Hospital and Health Network

 

Project Allocation

20,000,000

(C)  Acquisition, clearing, demolition, renovation, environmental remediation, construction, infrastructure, design, streets, utilities and other costs associated with the development of a library and classroom facility on the campus of Temple University

 

Project Allocation

120,000,000

(D)  Paley Library renovation and expansion. This authorization shall be construed to supplement the project authorized in section 3(5)(vii)(B) of the act of June 22, 2004 (P.L.257, No.40), known as the Capital Budget Project Itemization Act of 2003-2004

 

Project Allocation

40,000,000

(ix)  Thaddeus Stevens College of Technology

 

(A)  Replace and upgrade boiler plant at branch campus

 

Project Allocation

7,000,000

(Base Project Allocation - $6,048,000)

 

(Design and Contingencies - $952,000)

 

(B)  Renovate Mellor Building to comply with current building codes, including upgrade or replacement of electrical system, heating system, controls, bathrooms, offices, common areas, auditorium, security, communications, information technology systems, windows, doors and air conditioning, restoration of front porch and cleaning and repointing masonry exterior

 

Project Allocation

7,000,000

(Base Project Allocation - $6,160,000)

 

(Design and Contingencies - $840,000)

 

(C)  Additional funds for DGS Project 417-37, acquisition of existing building and conversion to dormitory, laboratory and classroom facilities

 

Project Allocation

3,000,000

(Base Project Allocation - $2,592,000)

 

(Design and Contingencies - $408,000)

 

(D)  Expand Hartzell Instructional Center to include a second floor and a connection to Jones Dining Hall

 

Project Allocation

3,200,000

(Base Project Allocation - $2,816,000)

 

(Design and Contingencies - $384,000)

 

(E)  Infrastructure, improvements, additions and renovations to existing building, including conversion to a dormitory, laboratory and classroom facility

 

Project Allocation

5,000,000

(x)  The Pennsylvania State University

 

(A)  Renovate Henning Building, including upgrades to systems to bring them to current facility standards

 

Project Allocation

20,000,000

(B)  Renovate Chemical Building, including laboratories, support spaces, classrooms and office spaces to meet modern codes

 

Project Allocation

19,700,000

(Base Project Allocation - $15,760,000)

 

(Design and Contingencies - $3,940,000)

 

(C)  Renovate university emergency radio network and infrastructure in conjunction with regional and county governments and emergency responders

 

Project Allocation

2,500,000

(Base Project Allocation - $2,000,000)

 

(Design and Contingencies - $500,000)

 

(D)  Construct new building and renovate existing building at the Philadelphia Navy Yard to improve energy efficiency and operability and reduce carbon emissions of existing buildings and to stimulate private investment and quality job creation in building energy efficiency retrofit markets in the Greater Philadelphia region and beyond

 

Project Allocation

60,000,000

(E)  Capital Renewal, Phase III, Central Region

 

Project Allocation

1,400,000

(F)  Capital Renewal, Phase III, Eastern Region

 

Project Allocation

1,400,000

(G)  Capital Renewal, Phase III, Western Region

 

Project Allocation

1,400,000

(H)  Capital Renewal, Phase V, University Park

 

Project Allocation

57,800,000

(I)  Renovations and rehabilitation of the Chemical Ecology Laboratory at University Park

 

Project Allocation

6,000,000

(J)  Infrastructure, construction and other related costs for the construction of a water treatment facility at University Park

 

Project Allocation

30,000,000

(K)  Infrastructure, renovations, rehabilitation, construction and other costs related to Phase II of infrastructure improvements at University Park

 

Project Allocation

40,000,000

(L)  Improvements and upgrades to greenhouse facilities at University Park, including demolition and construction of a new research greenhouse complex

 

Project Allocation

42,000,000

(M)  Infrastructure improvements, renovations and new construction of residence halls across the University system

 

Project Allocation

50,000,000

(N)  Infrastructure improvements, rehabilitation, construction and other costs, including the abatement of hazardous materials for renovations and additions to residence halls at University Park

 

Project Allocation

60,000,000

(O)  Expansion and construction of medical facilities at the Children's Hospital in Hershey, including infrastructure, renovations and construction of an addition to a parking garage and a new support services building

 

Project Allocation

81,000,000

(P)  Infrastructure improvements, rehabilitation, construction and other costs for renovations and additions to the Hetzel Union Building

 

Project Allocation

25,000,000

(Q)  Infrastructure, rehabilitation, construction and other costs, including the abatement of hazardous materials to meet new EPA and DEP clean air regulations

 

Project Allocation

25,000,000

(R)  Renovations, rehabilitation, construction and other costs related to an addition to existing computer building or construction of a new facility

 

Project Allocation

25,000,000

(S)  Additional funding for Henderson South renovation and construction

 

Project Allocation

22,000,000

(xi)  University of Pittsburgh

 

(A)  Renovate Thaw Hall, Allen Hall, Engineering Hall, Space Research and Nuclear Physics as one research

 

complex, including infrastructure

 

Project Allocation

20,000,000

(Base Project Allocation - $16,000,000)

 

(Design and Contingencies - $4,000,000)

 

(B)  Renovate Fisher Hall, Bradford campus, including infrastructure, to address current building and life safety codes

 

Project Allocation

5,000,000

(Base Project Allocation - $4,000,000)

 

(Design and Contingencies - $1,000,000)

 

(C)  Additional funds for mid-campus research complex renovations

 

Project Allocation

20,000,000

(Base Project Allocation - $16,000,000)

 

(Design and Contingencies - $4,000,000)

 

(D)  Benedum Hall renovations, Phase II

 

Project Allocation

40,000,000

(Base Project Allocation - $32,000,000)

 

(Design and Contingencies - $8,000,000)

 

(E)  Clapp, Langley and Crawford complex renovations

 

Project Allocation

25,000,000

(Base Project Allocation - $20,000,000)

 

(Design and Contingencies - $5,000,000)

 

(F)  Additional funds for Parran and Crabtree Halls renovations

 

Project Allocation

20,000,000

(Base Project Allocation - $16,000,000)

 

(Design and Contingencies - $4,000,000)

 

(G)  Salk Hall renovations

 

Project Allocation

20,000,000

(Base Project Allocation - $16,000,000)

 

(Design and Contingencies - $4,000,000)

 

(H)  Upgrades and deferred maintenance, Phase V

 

Project Allocation

20,000,000

(Base Project Allocation - $16,667,000)

 

(Design and Contingencies - $3,333,000)

 

(I)  Track and field/athletic field complex

 

Project Allocation

20,000,000

(Base Project Allocation - $16,000,000)

 

(Design and Contingencies - $4,000,000)

 

(J)  Addition and renovation of the Center for Biotechnology

 

Project Allocation

36,000,000

(Base Project Allocation - $28,800,000)

 

(Design and Contingencies - $7,200,000)

 

(K)  Construction of new mid-campus education/research center

 

Project Allocation

184,000,000

(Base Project Allocation - $147,200,000)

 

(Design and Contingencies - $36,800,000)

 

(L)  Programmatic and infrastructure upgrades, all campuses

 

Project Allocation

20,000,000

(Base Project Allocation - $15,000,000)

 

(Design and Contingencies - $5,000,000)

 

(M)  Renovations and infrastructure upgrades, all campuses

 

Project Allocation

20,000,000

(Base Project Allocation - $15,000,000)

 

(Design and Contingencies - $5,000,000)

 

(N)  Acquisition, clearing, demolition, renovation, environmental remediation, construction, infrastructure, design, streets, utilities and other costs associated with the development of a library and classroom facility on or adjacent to the campus of Temple University

 

Project Allocation

100,000,000

(xii)  Department of Education Headquarters

 

(A)  Improve and upgrade three floors of the Department of Education headquarters building at 333 Market Street, Harrisburg

 

Project Allocation

1,500,000

(Base Project Allocation - $1,200,000)

 

(Design and Contingencies - $300,000)

 

(5)  Department of Environmental Protection

 

(i)  Allegheny County

 

(A)  Provide additional funds for DGS Project 184-33, construct debris basin, concrete channel and box culvert in Borough of Pitcairn

 

Project Allocation

6,000,000

(Base Project Allocation - $5,000,000)

 

(Design and Contingencies - $1,000,000)

 

(B)  Provide additional funds for DGS Project 183-13, Streets Run flood protection project, Hays Section of the City of Pittsburgh

 

Project Allocation

32,500,000

(Base Project Allocation - $26,000,000)

 

(Design and Contingencies - $6,500,000)

 

(C)  A nonstructural approach in reducing flood-related damages and/or structural improvements to the Streets Run channel

 

Project Allocation

22,500,000

(Base Project Allocation - $18,000,000)

 

(Design and Contingencies - $4,500,000)

 

(D)  Construction of a regional flood protection facility in the area of Lower Allison Park, including acquisition and other related costs

 

Project Allocation

3,700,000

(i.1)  Bucks County

 

(A)  Storm water management construction project in Upper Southampton Township

 

Project Allocation

1,000,000

(ii)  Cambria County

 

(A)  Provide additional funds for DGS Project 183-19, construct a compacted earth levee system along South Fork of Little Conemaugh River and a rectangular channel along Otto Run in Townships of Adams and Croyle

 

Project Allocation

7,200,000

(Base Project Allocation - $6,000,000)

 

(Design and Contingencies - $1,200,000)

 

(B)  Construct active mine drainage treatment facility, including infrastructure, in Cresson

 

Project Allocation

4,000,000

(Base Project Allocation - $4,000,000)

 

(iii)  Clearfield County

 

(A)  Provide additional funds for DGS Project 182-22, replace culvert with larger structure to carry flood flow in Borough of Clearfield

 

Project Allocation

2,400,000

(Base Project Allocation - $2,000,000)

 

(Design and Contingencies - $400,000)

 

(iv)  Crawford County

(A)  Provide additional funds for DGS Project 183-16, divert Church Run flows on an alignment directly to Oil Creek in City of Titusville

 

Project Allocation

7,200,000

(Base Project Allocation - $6,000,000)

 

(Design and Contingencies - $1,200,000)

 

(v)  Dauphin County

 

(A)  Purchase laboratory building

 

Project Allocation

40,000,000

(Base Project Allocation - $40,000,000)

 

(vi)  Delaware County

 

(A)  Rebuild a Marple Township storm sewer pipe and open culvert and stabilize creek bank along Darby Creek, including construction, infrastructure and other related costs

 

Project Allocation

110,000

(vii)  Fulton County

 

(A)  Construct two stream channels which currently discharge into an abandoned mine surface mine pit and an abandoned deep mine in Wells

 

Project Allocation

1,200,000

(Base Project Allocation - $1,200,000)

 

(viii)  Indiana County

 

(A)  Construct active mine drainage treatment facility, including infrastructure, in Buffington

 

Project Allocation

3,000,000

(Base Project Allocation - $3,000,000)

 

(ix)  Lackawanna County

 

(A)  Provide additional funds for DGS Project 184-22, construct concrete rectangle channel, concrete box culvert and concrete pipe along Meadow Brook to upstream Jefferson Avenue in City of Scranton

 

Project Allocation

12,000,000

(Base Project Allocation - $10,000,000)

 

(Design and Contingencies - $2,000,000)

 

(ix.1)  Lehigh County

 

(A)  Joint municipal project between Salisbury Township and Fountain Hill Borough for the installation of a new storm sewer line to address drainage and soil erosion

 

Project Allocation

125,000

(B)  Storm sewer rehabilitation, Phase 4, Long and Clewel Streets in Fountain Hill

 

Project Allocation

100,000

(C)  Storm sewer rehabilitation, Phase 5, Seneca and Hoffert Streets in Fountain Hill

 

Project Allocation

100,000

(D)  Design and construct new culvert on Narcissa Road in Plymouth Township

 

Project Allocation

400,000

(E)  Design and construct new culvert on Brook Road in Plymouth Township

 

Project Allocation

500,000

(F)  Grading modifications and installation of new culverts between the Radnor Township line to Joel Drive for Garrison Way for drainage improvements in Upper Merion Township

 

Project Allocation

320,000

(x)  Luzerne County

 

(A)  Provide additional funds for DGS Project 181-20, replace inadequate and deteriorating culvert along Sulfur Run in Borough of Ashley

 

Project Allocation

2,400,000

(Base Project Allocation - $2,000,000)

 

(Design and Contingencies - $400,000)

 

(B)  Provide additional funds for DGS Project 181-13, replace Roberts Street Bridge and improve channel along Newport Creek in Borough of Newport

 

Project Allocation

3,600,000

(Base Project Allocation - $3,000,000)

 

(Design and Contingencies - $600,000)

 

(C)  Plymouth Flood Control Project to include removing a portion of the Brown Creek debris basin embankment, addressing subsurface problems, reconstructing embankment, removing accumulated sediment within basin area, rehabilitating concrete inlet structure and improving the trash rack

 

Project Allocation

2,400,000

(Base Project Allocation - $2,000,000)

 

(Design and Contingencies - $400,000)

 

(D)  Provide additional funds for DGS Project 181-23, replace deteriorating culvert in Borough of Yatesville

 

Project Allocation

2,400,000

(Base Project Allocation - $2,000,000)

 

(Design and Contingencies - $400,000)

 

(xi)  McKean County

 

(A)  Additional funds for DGS Project 182-0010, flood protection, Port Allegany Borough

 

Project Allocation

8,030,000

(Base Project Allocation - $6,500,000)

 

(Design and Contingencies - $1,530,000)

 

(B)  Provide additional funds for DGS Project 182-10, renovate existing compacted earth levee and construct new levee along Allegheny River

 

Project Allocation

16,800,000

(Base Project Allocation - $14,000,000)

 

(Design and Contingencies - $2,800,000)

 

(C)  Construction, acquisition, infrastructure and other related costs for a flood control project

 

Project Allocation

20,000,000

(xii)  Montgomery County

 

(A)  Construct a regional flood control basin within the Stuart Farm Creek/Honey Run watershed area to reduce downstream flooding, including a downstream channel, culvert, drainage improvements, infrastructure and other related costs

 

Project Allocation

3,250,000

(B)  Upgrade portions of storm sewer in the Borough of Hatboro to allow for improved drainage, including acquisition, construction and other related costs

 

Project Allocation

3,000,000

(C)  Construct storm water control facilities and other related costs for Kohler Park and Park Creek flood control project

 

Project Allocation

1,500,000

(D)  Infiltration and inflow remediation

 

Project Allocation

100,000

(E)  Infiltration and inflow remediation

 

Project Allocation

100,000

(F)  Design and construct new culvert on Narcissa Road in Plymouth Township

 

Project Allocation

400,000

(G)  Design and construct new culvert on Brook Road in Plymouth Township

 

Project Allocation

500,000

(H)  Grading modifications and installation of new culverts between the Radnor Township line to Joel Drive for Garrison Way for drainage improvements in Upper Merion Township

 

Project Allocation

320,000

(I)  Reconstruction and naturalization of an existing retention basin and installation of a new storm water collection and conveyance system for Warner Road storm water improvement project in White Marsh Township

 

Project Allocation

1,080,000

(xiii)  Northumberland County

 

(A)  Provide additional funds for DGS Project 182-18, construct concrete rectangle channel along Shamokin Creek through the Borough of Mount Carmel

 

Project Allocation

4,800,000

(Base Project Allocation - $4,000,000)

 

(Design and Contingencies - $800,000)

 

(B)  Provide additional funds for DGS Project 182-18, construct a concrete rectangle channel along Butternut Creek and contain flood flows from storm water culvert in Township of Mount Carmel

 

Project Allocation

2,400,000

(Base Project Allocation - $2,000,000)

 

(Design and Contingencies - $400,000)

 

(xiv)  Westmoreland County

 

(A)  Additional funds for Export/Murrysville flood control project, Phase 2, excavation, expansion and reconstruction of existing dam located near Puckety Drive or an alternative to a detention project

 

Project Allocation

7,200,000

(Base Project Allocation - $6,000,000)

 

(Design and Contingencies - $1,200,000)

 

(6)  Department of General Services

 

(i)  Dauphin County

 

(A)  Remove and replace existing roof on Agriculture Building

 

Project Allocation

1,040,000

(Base Project Allocation - $800,000)

 

(Design and Contingencies - $240,000)

 

(B)  Replace roof on Capitol East Wing Building

 

Project Allocation

650,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $150,000)

 

(C)  Complete renovation of Roman fountain in the Capitol East Wing, including wiring lighting fixtures and controls

 

Project Allocation

400,000

(Base Project Allocation - $300,000)

 

(Design and Contingencies - $100,000)

 

(D)  Install sprinkler system and upgrade fire panels, including enunciators, at Central Plant

 

Project Allocation

650,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $150,000)

 

(E)  Upgrade heating systems and install central air conditioning in occupied buildings in the DGS Annex Complex

 

Project Allocation

3,750,000

(Base Project Allocation - $3,750,000)

 

(F)  Replace and upgrade steam plant to DGS Annex Complex, including pneumatic controls and burners

 

Project Allocation

1,563,000

(Base Project Allocation - $1,563,000)

 

(G)  Replace 124 ceiling-mounted heat pumps and eight heating units to a centralized format with new ductwork in the DGS Annex Complex

 

Project Allocation

5,940,000

(Base Project Allocation - $5,940,000)

 

(H)  Upgrade electrical distribution system and replace fire and security system throughout the buildings in the DGS Annex Complex

 

Project Allocation

3,600,000

(Base Project Allocation - $3,600,000)

 

(I)  Remediate mold, asbestos and other hazardous material items in buildings and equipment areas in the DGS Annex Complex

 

Project Allocation

6,750,000

(Base Project Allocation - $5,625,000)

 

(Design and Contingencies - $1,125,000)

 

(J)  Install sprinkler system and upgrade fire panels, including enunciators, in the Finance Office Building

 

Project Allocation

520,000

(Base Project Allocation - $400,000)

 

(Design and Contingencies - $120,000)

 

(K)  Install HVAC from the central plant to the entire Finance Office Building

 

Project Allocation

13,000,000

(Base Project Allocation - $10,000,000)

 

(Design and Contingencies - $3,000,000)

 

(L)  Renovate restrooms, including replacement of fixtures, in the Finance Office Building

 

Project Allocation

1,300,000

(Base Project Allocation - $1,000,000)

 

(Design and Contingencies - $300,000)

 

(M)  Replace and install interior central plant steam lines in the Forum Building

 

Project Allocation

2,600,000

(Base Project Allocation - $2,000,000)

 

(Design and Contingencies - $600,000)

 

(N)  Insulate chilled water lines in the Irvis Office Building

 

Project Allocation

650,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $150,000)

 

(O)  Install sprinkler system and upgrade fire panels, including enunciators, in the Irvis Office Building

 

Project Allocation

1,300,000

(Base Project Allocation - $1,000,000)

 

(Design and Contingencies - $300,000)

 

(P)  Clean, seal and sanitize HVAC system and ductwork in the Irvis Office Building

 

Project Allocation

520,000

(Base Project Allocation - $400,000)

 

(Design and Contingencies - $120,000)

 

(Q)  Renovate elevators, including repair and replacement of cabs, carpeting and motors in the Irvis Office Building

 

Project Allocation

910,000

(Base Project Allocation - $700,000)

 

(Design and Contingencies - $210,000)

 

(R)  Clean, seal and sanitize HVAC system and ductwork in the Labor and Industry Building

 

Project Allocation

520,000

(Base Project Allocation - $400,000)

 

(Design and Contingencies - $120,000)

 

(S)  Update and renovate all elevators and chair lifts in the Labor and Industry Building

 

Project Allocation

575,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $75,000)

 

(T)  Insulate chilled water lines in the North Office Building

 

Project Allocation

650,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $150,000)

 

(U)  Install sprinkler system and upgrade fire panels, including enunciators, in the North Office Building

 

Project Allocation

1,040,000

(Base Project Allocation - $800,000)

 

(Design and Contingencies - $240,000)

 

(V)  Clean, seal and sanitize HVAC system and ductwork in the North Office Building

 

Project Allocation

520,000

(Base Project Allocation - $400,000)

 

(Design and Contingencies - $120,000)

 

(W)  Repair drainage system, deck joints, all spalls, sidewalks, curbs and barrier; blast clean, spot paint and install diaphragms between joists at the State Street Bridge

 

Project Allocation

3,329,000

(Base Project Allocation - $2,561,000)

 

(Design and Contingencies - $768,000)

 

(X)  Renovate the 10th and Market Street Building, including windows, HVAC, roof and exterior masonry to utilize building as office space

 

Project Allocation

6,500,000

(Base Project Allocation - $5,000,000)

 

(Design and Contingencies - $1,500,000)

 

(ii)  Lackawanna County

 

(A)  Replace all windows throughout the Scranton State Office Building for reduced maintenance and higher efficiency

 

Project Allocation

455,000

(Base Project Allocation - $350,000)

 

(Design and Contingencies - $105,000)

 

(iii)  Philadelphia County

 

(A)  Construct new building and renovate existing building at the Philadelphia Navy Yard to improve energy efficiency and operability and reduce carbon emissions of existing buildings and to stimulate private investment and quality job creation in building energy efficiency retrofit markets in the Greater Philadelphia region and beyond

 

Project Allocation

60,000,000

(B)  General port improvements to the Port of Philadelphia for the Philadelphia Regional Port Authority

 

Project Allocation

75,000,000

(C)  Renovations and rehabilitation of Pennsylvania Convention Center facilities

 

Project Allocation

10,000,000

(7)  Pennsylvania Historical and Museum Commission

 

(i)  Brandywine Battlefield

 

(A)  Renovations and rehabilitation of existing facilities and construction of a new facility for educational purposes and events, including acquisition, infrastructure and all related costs

 

Project Allocation

3,000,000

(i.1)  Daniel Boone Homestead

 

(A)  Upgrade sewage treatment and other infrastructure, including HVAC systems with geothermal systems and other energy-saving equipment

 

Project Allocation

9,600,000

(Base Project Allocation - $8,000,000)

 

(Design and Contingencies - $1,600,000)

 

(ii)  Eckley Miners' Village

 

(A)  Upgrade sewage treatment and other infrastructure, including HVAC systems with geothermal systems and other energy-saving equipment

 

Project Allocation

4,800,000

(Base Project Allocation - $4,000,000)

 

(Design and Contingencies - $800,000)

 

(iii)  Ephrata Cloister

 

(A)  Upgrade HVAC systems with geothermal systems and other energy-saving equipment

 

Project Allocation

2,400,000

(Base Project Allocation - $2,000,000)

 

(Design and Contingencies - $400,000)

 

(iv)  Erie Maritime Museum

 

(A)  Renovate US Brig Niagara, including hull, rigging and equipment and partially replace masts, planking and standing rigging

 

Project Allocation

4,800,000

(Base Project Allocation - $4,000,000)

 

(Design and Contingencies - $800,000)

 

(B)  Renovate and repair building, including masonry repairs, waterproofing, water management and other repairs

 

Project Allocation

1,200,000

(Base Project Allocation - $1,200,000)

 

(v)  Fort Pitt Museum

 

(A)  Renovate first floor museum, including replacement and expansion of restrooms, visitors center and office and exterior improvements

 

Project Allocation

6,000,000

(Base Project Allocation - $5,000,000)

 

(Design and Contingencies - $1,000,000)

 

(vi)  Landis Valley Museum

 

(A)  Upgrade sewage, water, electrical, phone, data and fire and security lines and other infrastructure, including HVAC systems with geothermal systems and other energy-saving equipment

 

Project Allocation

9,000,000

(Base Project Allocation - $7,500,000)

 

(Design and Contingencies - $1,500,000)

 

(B)  Prepare Bitzer Barn for exhibits reflecting the site, including infrastructure

 

Project Allocation

3,000,000

(Base Project Allocation - $3,000,000)

 

(vi.1)  Old Chester Courthouse

 

(A)  Land acquisition, renovations, rehabilitation, construction and other costs related to the Old Chester Courthouse, courtyard and adjacent property

 

Project Allocation

6,000,000

(vi.2)  Old Economy Village

 

(A)  Rehabilitation, renovation and upgrades of facilities, including infrastructure, construction and other related costs for Old Economy Village, located in Ambridge Borough, Beaver County

 

Project Allocation

1,000,000

(vii)  Pennsbury Manor

 

(A)  Upgrade HVAC systems with geothermal systems and other energy-saving equipment

 

Project Allocation

3,600,000

(Base Project Allocation - $3,000,000)

 

(Design and Contingencies - $600,000)

 

(viii)  Pennsylvania Anthracite Heritage Museum

 

(A)  Upgrade sewage treatment and other infrastructure, including HVAC systems with geothermal systems and other energy-saving equipment

 

Project Allocation

2,400,000

(Base Project Allocation - $2,000,000)

 

(Design and Contingencies - $400,000)

 

(ix)  Pennsylvania Military Museum

 

(A)  Upgrade HVAC systems with geothermal systems and other energy-saving equipment

 

Project Allocation

3,600,000

(Base Project Allocation - $3,000,000)

 

(Design and Contingencies - $600,000)

 

(x)  Railroad Museum of Pennsylvania

 

(A)  Upgrade HVAC systems with geothermal systems and other energy-saving equipment

 

Project Allocation

4,800,000

(Base Project Allocation - $4,000,000)

 

(Design and Contingencies - $800,000)

 

(B)  Design and construct new rolling stock storage facility and railroad transfer table with appropriate infrastructure

 

Project Allocation

12,000,000

(Base Project Allocation - $12,000,000)

 

(xi)  Somerset Historical Center

 

(A)  Upgrade sewage treatment and other infrastructure, including HVAC systems with geothermal systems and other energy-saving equipment

 

Project Allocation

2,400,000

(Base Project Allocation - $2,000,000)

 

(Design and Contingencies - $400,000)

 

(xii)  Washington Crossing Historic Park

 

(A)  Upgrade sewage treatment and other infrastructure, including HVAC systems with geothermal systems and other energy-saving equipment

 

Project Allocation

9,600,000

(Base Project Allocation - $8,000,000)

 

(Design and Contingencies - $1,600,000)

 

(B)  Addition to Washington Crossing Historic Park Visitor's Center, including construction and other related costs

 

Project Allocation

1,000,000

(8)  Department of Military and Veterans Affairs

 

(i)  Combined Surface Maintenance Shop West, Pittsburgh, Allegheny County

 

(A)  Consolidate three field maintenance shops in the region into one unit with unheated storage facilities, parking facilities and infrastructure

 

Project Allocation

2,000,000

(Base Project Allocation - $1,800,000)

 

(Design and Contingencies - $200,000)

 

(ii)  Southwestern Veterans' Center, Allegheny County

 

(A)  Provide for renovation and general repairs of veterans' center, including patio enclosure, facility chiller replacement, perimeter fencing, facility flooring and expansion and replacement of existing parking lot

 

Project Allocation

2,750,000

(Base Project Allocation - $2,200,000)

 

(Design and Contingencies - $550,000)

 

(B)  Provide for renovation and general repairs of veterans' center, including replacement of facility roof

 

Project Allocation

750,000

(Base Project Allocation - $600,000)

 

(Design and Contingencies - $150,000)

 

(iii)  Beaver Falls Readiness Center, Beaver County

 

(A)  Rehabilitate Beaver Falls Readiness Center, including assembly hall, classrooms, administrative offices, storage spaces, restrooms, locker rooms and mechanical rooms; upgrade building systems, including HVAC, roofs, windows and doors; repair facade; expand parking and construct unheated storage facility

 

Project Allocation

4,300,000

(Base Project Allocation - $3,700,000)

 

(Design and Contingencies - $600,000)

 

(iv)  Everett Readiness Center, Bedford County

 

(A)  Additional funding for construction of National Guard Readiness Center

 

Project Allocation

4,000,000

(Base Project Allocation - $3,200,000)

 

(Design and Contingencies - $800,000)

 

(v)  Hamburg Readiness Center, Berks County

 

(A)  Rehabilitate Hamburg Readiness Center, including assembly hall, classrooms, administrative offices, storage spaces, restrooms, locker rooms and mechanical rooms; upgrade building systems, including HVAC, roofs, windows and doors; repair facade; expand parking and construct unheated storage facility

 

Project Allocation

2,300,000

(Base Project Allocation - $2,000,000)

 

(Design and Contingencies - $300,000)

 

(vi)  Hollidaysburg Veterans' Home, Blair County

 

(A)  Provide for renovation and general repairs of veterans home including upgrading electrical system and plumbing in MacArthur Hall, upgrading HVAC, roof replacement, life safety project and dietary tray system

 

Project Allocation

4,170,000

(Base Project Allocation - $3,336,000)

 

(Design and Contingencies - $834,000)

 

(B)  Provide for renovation and general repairs of veterans home to include design and upgrade of community living center at Eisenhower Hall and construction of meal delivery systems at Arnold and Eisenhower Halls

 

Project Allocation

1,000,000

(Base Project Allocation - $800,000)

 

(Design and Contingencies - $200,000)

 

(vii)  Bradford/Wyoming Readiness Center, Bradford County

 

(A)  Construct National Guard Readiness Center, including assembly hall, dining facility, classrooms, administrative offices, storage space, restrooms, locker rooms and parking and renovate existing facility

 

Project Allocation

5,651,000

(Base Project Allocation - $3,500,000)

 

(Land Allocation - $1,500,000)

 

(Design and Contingencies - $651,000)

 

(viii)  Johnstown Readiness Center, Cambria County

 

(A)  Rehabilitate Johnstown Readiness Center, including assembly hall, classrooms, administrative offices, storage spaces, restrooms, locker rooms and mechanical rooms; upgrade building systems, including HVAC, roofs, windows and doors; repair facade; expand parking and construct unheated storage facility

 

Project Allocation

4,300,000

(Base Project Allocation - $3,800,000)

 

(Design and Contingencies - $500,000)

 

(ix)  Carbondale Readiness Center, Carbon County

 

(A)  Rehabilitate Carbondale Readiness Center, including assembly hall, classrooms, administrative offices, storage spaces, restrooms, locker rooms and mechanical rooms; upgrade building systems, including HVAC, roofs, windows and doors; repair facade; expand parking and construct unheated storage facility

 

Project Allocation

2,700,000

(Base Project Allocation - $2,200,000)

 

(Design and Contingencies - $500,000)

 

(x)  Lehighton Readiness Center, Carbon County

 

(A)  Rehabilitate Lehighton Readiness Center, including assembly hall, classrooms, administrative offices, storage spaces, restrooms, locker rooms and mechanical rooms; upgrade building systems, including HVAC, roofs, windows and doors; repair facade; expand parking and construct unheated storage facility

 

Project Allocation

2,700,000

(Base Project Allocation - $2,400,000)

 

(Design and Contingencies - $300,000)

 

(xi)  Phoenixville Readiness Center, Chester County

 

(A)  Rehabilitate Phoenixville Readiness Center, including assembly hall, classrooms, administrative offices, storage spaces, restrooms, locker rooms and mechanical rooms; upgrade building systems, including HVAC, roofs, windows and doors and repair facade

 

Project Allocation

5,000,000

(Base Project Allocation - $4,200,000)

 

(Design and Contingencies - $800,000)

 

(xii)  Southeastern Veterans' Home, Chester County

 

(A)  Provide for renovation and general repairs of veterans center to include upgrades and renovations at Coates Hall and construction of new maintenance building

 

Project Allocation

7,000,000

(Base Project Allocation - $5,600,000)

 

(Design and Contingencies - $1,400,000)

 

(xiii)  Clearfield Readiness Center, Clearfield County

 

 

(A)  Construct National Guard Readiness Center

 

Project Allocation

6,000,000

(Base Project Allocation - $5,200,000)

 

(Design and Contingencies - $800,000)

 

(xiv)  Hershey Readiness Center, Dauphin County

 

(A)  Rehabilitate Hershey Readiness Center, including assembly hall, classrooms, administrative offices, storage spaces, restrooms, locker rooms and mechanical rooms; upgrade building systems, including HVAC, roofs, windows and doors; repair facade; expand parking and construct unheated storage facility

 

Project Allocation

2,500,000

(Base Project Allocation - $2,200,000)

 

(Design and Contingencies - $300,000)

 

(xv)  Williamstown Readiness Center, Dauphin County

 

(A)  Rehabilitate Williamstown Readiness Center, including assembly hall, classrooms, administrative offices, storage spaces, restrooms, locker rooms and mechanical rooms; upgrade building systems, including HVAC, roofs, windows and doors; repair facade; expand parking and construct unheated storage facility

 

Project Allocation

3,000,000

(Base Project Allocation - $2,600,000)

 

(Design and Contingencies - $400,000)

 

(xvi)  Erie Readiness Center, Erie County

 

(A)  Construct National Guard Readiness Center

 

Project Allocation

5,000,000

(Base Project Allocation - $4,200,000)

 

(Design and Contingencies - $800,000)

 

(xvii)  Pennsylvania Soldiers' and Sailors' Home, Erie County

 

(A)  Provide for renovation and general repairs of veterans home, including replacement of PCU fan coil units, NCU rolled rubber roof and PCU metal roof installation

 

Project Allocation

1,470,000

(Base Project Allocation - $1,176,000)

 

(Design and Contingencies - $294,000)

 

(B)  Provide for renovation and general repairs of veterans home, including life safety and regulatory deficiencies

 

Project Allocation

500,000

(Base Project Allocation - $400,000)

 

(Design and Contingencies - $100,000)

 

(xviii)  Waynesburg Readiness Center, Greene County

 

(A)  Provide additional funds to construct National Guard Readiness Center, including assembly hall, dining facility, classrooms, administrative offices, storage space, restrooms, locker rooms and mechanical room

 

Project Allocation

856,000

(Base Project Allocation - $698,000)

 

(Design and Contingencies - $158,000)

 

(xix)  Gino J. Merli Veterans' Center, Lackawanna County

 

(A)  Provide for renovation and general repairs to veterans center, including food preparation and dietary systems change, facility roof repair and 155- ton water-cooled screw chiller

 

Project Allocation

300,000

(Base Project Allocation - $240,000)

 

(Design and Contingencies - $60,000)

 

(B)  Provide for renovation and general repairs of veterans center, including life safety and regulatory deficiencies

 

Project Allocation

500,000

(Base Project Allocation - $400,000)

 

(Design and Contingencies - $100,000)

 

(xx)  Marquette Lake Dam, Lebanon County

 

(A)  Renovate Marquette Lake Dam, including armoring the breast of the dam with roller-compacted concrete to preserve all desirable effects of the lake, military training, flood control, sediment retention, firefighting and public recreation and to provide the required level of safety

 

Project Allocation

8,000,000

(Base Project Allocation - $7,500,000)

 

(Design and Contingencies - $500,000)

 

(xxi)  Nanticoke Readiness Center, Luzerne County

 

(A)  Renovate Nanticoke Readiness Center

 

Project Allocation

5,000,000

(Base Project Allocation - $4,200,000)

 

(Design and Contingencies - $800,000)

 

(xxii)  Fort Indiantown Gap, Lebanon County

 

(A)  Acquisition of privately owned lands within the boundaries of the Fort Indiantown Gap installation to support the training and activities of the installation and for the benefit of the Pennsylvania military forces

 

Project Allocation

1,500,000

(Land Allocation - $1,500,000)

 

(B)  Purchase in-holdings on Fort Indiantown Gap property and/or surrounding property as part of Joint Land Use Agreement and Army Compatibility Use Buffers

 

Project Allocation

4,000,000

(Land Allocation - $4,000,000)

 

(xxiii)  Field Maintenance Shop, Lycoming/Montour County

 

(A)  Construct National Guard field maintenance shop, including work bays, electronics shop, small arms repair shop, tool and supply, administrative areas and parking facilities

 

Project Allocation

3,900,000

(Base Project Allocation - $2,000,000)

 

(Land Allocation - $1,500,000)

 

(Design and Contingencies - $400,000)

 

(xxiv)  Grove City Readiness Center, Mercer County

 

(A)  Rehabilitate Grove City Readiness Center, including assembly hall, classrooms, administrative offices, storage spaces, restrooms, locker rooms and mechanical rooms; upgrade building systems, including HVAC, roofs, windows and doors; repair facade; expand parking and construct unheated storage facility

 

Project Allocation

1,800,000

(Base Project Allocation - $1,500,000)

 

(Design and Contingencies - $300,000)

 

(xxv)  Horsham Joint Interagency Installation, Montgomery County

 

(A)  Renovate and upgrade Buildings 201, 229, 230, 335, 345, 346 and 348, including utility service, utility upgrades and heating

 

Project Allocation

2,400,000

(Base Project Allocation - $2,000,000)

 

(Design and Contingencies - $400,000)

 

(B)  Install pumping station to reroute installation's water and sewer lines and connections with adjacent military enclave

 

Project Allocation

1,250,000

(Base Project Allocation - $1,000,000)

 

(Design and Contingencies - $250,000)

 

(C)  Improve water and sewer systems at installation

 

Project Allocation

5,000,000

(Base Project Allocation - $4,500,000)

 

(Design and Contingencies - $500,000)

 

(D)  Install improvements at Pitcairn-Willow Grove Air Field, including navigation aids and instrument landing system

 

Project Allocation

3,000,000

(Base Project Allocation - $2,000,000)

 

(Land Allocation - $500,000)

 

(Design and Contingencies - $500,000)

 

(xxvi)  Delaware Valley Veterans' Home, Philadelphia County

 

(A)  Provide for renovation and general repairs of veterans home, including life safety and regulatory deficiencies

 

Project Allocation

500,000

(Base Project Allocation - $400,000)

 

(Design and Contingencies - $100,000)

 

(xxvii)  Friedens Readiness Center, Somerset County

 

(A)  Rehabilitate Friedens Readiness Center, including assembly hall, classrooms, administrative offices, storage spaces, restrooms, locker rooms and mechanical rooms; upgrade building systems, including HVAC, roofs, windows and doors and repair facade

 

Project Allocation

2,500,000

(Base Project Allocation - $2,200,000)

 

(Design and Contingencies - $300,000)

 

(xxviii)  Lewisburg Readiness Center, Union County

 

(A)  Rehabilitate Lewisburg Readiness Center, including assembly hall, classrooms, administrative offices, storage spaces, restrooms, locker rooms and mechanical rooms; upgrade building systems, including HVAC, roofs, windows and doors; repair facade; expand parking and construct unheated storage facility

 

Project Allocation

5,000,000

(Base Project Allocation - $4,300,000)

 

(Design and Contingencies - $700,000)

 

(xxix)  Honesdale Readiness Center, Wayne County

 

(A)  Renovate existing Honesdale Readiness Center and upgrade antiterrorism protection measures

 

Project Allocation

4,560,000

(Base Project Allocation - $4,000,000)

 

(Design and Contingencies - $560,000)

 

(xxx)  Greensburg Readiness Center, Westmoreland County

 

(A)  Rehabilitate Greensburg Readiness Center, including assembly hall, classrooms, administrative offices, storage spaces, restrooms, locker rooms and mechanical rooms; upgrade building systems, including HVAC, roofs, windows and doors; repair facade; expand parking and construct unheated storage facility

 

Project Allocation

2,600,000

(Base Project Allocation - $2,200,000)

 

(Design and Contingencies - $400,000)

 

(xxxi)  York Readiness Center, York County

 

(A)  Additional funding for construction of National Guard Readiness Center

 

Project Allocation

3,000,000

(Base Project Allocation - $2,500,000)

 

(Design and Contingencies - $500,000)

 

(9)  Department of Public Welfare

 

(i)  Allentown State Hospital

 

(A)  Replace fire control system in hospital building to meet new standards

 

Project Allocation

810,000

(Base Project Allocation - $675,000)

 

(Design and Contingencies - $135,000)

 

(ii)  Clarks Summit State Hospital

 

(A)  Install energy-efficient heating and cooling systems for residents' bedrooms and common areas

 

Project Allocation

2,160,000

(Base Project Allocation - $1,800,000)

 

(Design and Contingencies - $360,000)

 

(B)  Install new 400-amp service to meet current electrical requirements

 

Project Allocation

1,440,000

(Base Project Allocation - $1,200,000)

 

(Design and Contingencies - $240,000)

 

(iii)  (Reserved)

 

(iv)  Danville State Hospital

 

(A)  Install new 400-amp service to meet current electrical requirements

 

Project Allocation

1,800,000

(Base Project Allocation - $1,500,000)

 

(Design and Contingencies - $300,000)

 

(v)  Ebensburg Center

 

(A)  Complete facility-wide steam and condensate replacement project to reduce dependency on local supplier

 

Project Allocation

1,920,000

(Base Project Allocation - $1,600,000)

 

(Design and Contingencies - $320,000)

 

(B)  Replace roofing

 

Project Allocation

1,584,000

(Base Project Allocation - $1,320,000)

 

(Design and Contingencies - $264,000)

 

(C)  Additional funds for DGS Project 583-17, replace main direct sanitary line to municipal plant for Ebensburg Center and County PennDOT Office

 

Project Allocation

156,000

(Base Project Allocation - $130,000)

 

(Design and Contingencies - $26,000)

 

(v.1)  Loysville Cresson Secure Treatment Unit

 

(A)  Construct, equip and furnish a

multipurpose space, including

classroom, gym and kitchen facilities

 

Project Allocation

2,111,000

(Base Project Allocation - $1,776,000)

 

(Design and Contingencies - $335,000)

 

(vi)  Loysville Youth Development Center

 

(A)  Construct mandated water filtration system to supplement DGS Project 0588-0009, construction of a water filtration system

 

Project Allocation

594,000

(Base Project Allocation - $495,000)

 

(Design and Contingencies - $99,000)

 

(vii)  New Castle Youth Development Center

 

(A)  Install new HVAC system and associated control and electrical system

 

Project Allocation

1,188,000

(Base Project Allocation - $990,000)

 

(Design and Contingencies - $198,000)

 

(B)  Install new HVAC system and associated control and electrical system in dining area

 

Project Allocation

480,000

(Base Project Allocation - $400,000)

 

(Design and Contingencies - $80,000)

 

(C)  Install new transformers to replace existing PCB transformers

 

Project Allocation

1,800,000

(Base Project Allocation - $1,500,000)

 

(Design and Contingencies - $300,000)

 

(D)  Construct new activities center, including site preparation and associated utilities

 

Project Allocation

1,734,000

(Base Project Allocation - $1,445,000)

 

(Design and Contingencies - $289,000)

 

(viii)  Norristown State Hospital

 

(A)  Renovate existing absorption steam chiller necessary for patient health and safety

 

Project Allocation

720,000

(Base Project Allocation - $600,000)

 

(Design and Contingencies - $120,000)

 

(B)  Install new HVAC system in building for patient and worker health

 

Project Allocation

2,520,000

(Base Project Allocation - $2,100,000)

 

(Design and Contingencies - $420,000)

 

(C)  Additional funds for DGS Project 509-29, reconstruct or replace boilers to meet emissions requirements and upgrade the steam distribution system

 

Project Allocation

840,000

(Base Project Allocation - $700,000)

 

(Design and Contingencies - $140,000)

 

(ix)  Polk Center

 

(A)  Replace deteriorated sections of storm drains to prevent deterioration of 13 building foundations

 

Project Allocation

1,440,000

(Base Project Allocation - $1,200,000)

 

(Design and Contingencies - $240,000)

 

(B)  Install new HVAC system and associated control and electrical system in dining area

 

Project Allocation

900,000

(Base Project Allocation - $750,000)

 

(Design and Contingencies - $150,000)

 

(x)  Selinsgrove Center

 

(A)  Additional funds for DGS Project 553-34, renovate potable water system

 

Project Allocation

2,190,000

(Base Project Allocation - $1,800,000)

 

(Design and Contingencies - $390,000)

 

(B)  Refurbish inside and outside of water towers, including access ladders and concrete bases to meet code requirements

 

Project Allocation

1,200,000

(Base Project Allocation - $1,000,000)

 

(Design and Contingencies - $200,000)

 

(xi)  South Mountain Restoration Center

 

(A)  Construct, equip and furnish a

multipurpose space, including

classroom, gym and kitchen facilities

 

Project Allocation

1,680,000

(Base Project Allocation - $1,400,000)

 

(Design and Contingencies - $280,000)

 

(xii)  South Mountain Secure Treatment Unit

 

(A)  Install new HVAC system and associated control and electrical system

 

Project Allocation

4,800,000

(Base Project Allocation - $4,000,000)

 

(Design and Contingencies - $800,000)

 

(xiii)  Torrance State Hospital

 

(A)  Additional funds for DGS Project 513-29, renovate HVAC systems in the Wiseman Building

 

Project Allocation

1,150,000

(Base Project Allocation - $1,000,000)

 

(Design and Contingencies - $150,000)

 

(xiv)  Warren State Hospital

 

(A)  Renovate fire alarm and suppression system for patient and campus buildings

 

Project Allocation

3,000,000

(Base Project Allocation - $2,500,000)

 

(Design and Contingencies - $500,000)

 

(B)  Install modernized roof systems

 

Project Allocation

720,000

(Base Project Allocation - $600,000)

 

(Design and Contingencies - $120,000)

 

(xv)  Wernersville State Hospital

 

(A)  Repair Breech Mill Dam breast and connecting waterway conduits

 

Project Allocation

1,560,000

(Base Project Allocation - $1,300,000)

 

(Design and Contingencies - $260,000)

 

(B)  Install modernized roof system

 

Project Allocation

480,000

(Base Project Allocation - $400,000)

 

(Design and Contingencies - $80,000)

 

(C)  Provide funds to install modernized roof system

 

Project Allocation

390,000

(Base Project Allocation - $325,000)

 

(Design and Contingencies - $65,000)

 

(D)  Rebuild and reinforce collapsing utility tunnel system to ensure utility services

 

Project Allocation

420,000

(Base Project Allocation - $350,000)

 

(Design and Contingencies - $70,000)

 

(xvi)  White Haven Center

 

(A)  Upgrade heating system in residential and program buildings from radiant system to more modern, digitally controlled, high-efficiency HVAC system

 

Project Allocation

3,360,000

(Base Project Allocation - $2,800,000)

 

(Design and Contingencies - $560,000)

 

(B)  Additional funds for DGS Project 581-11, upgrade the steam and condensate distribution system throughout the facility

 

Project Allocation

2,400,000

(Base Project Allocation - $2,000,000)

 

(Design and Contingencies - $400,000)

 

(C)  Install equipment and materials to provide water park in place of existing pool

 

Project Allocation

600,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $100,000)

 

(10)  State Police

 

(i)  Erie Headquarters, Erie County

 

(A)  Construct new headquarters facility, garage, crime lab and aviation hangar to replace existing owned and leased facilities

 

Project Allocation

13,900,000

(Base Project Allocation - $10,750,000)

 

(Land Allocation - $1,000,000)

 

(Design and Contingencies - $2,150,000)

 

(ii)  Washington Headquarters, Washington County

 

(A)  Additional funds to construct new headquarters building

 

Project Allocation

6,900,000

(Base Project Allocation - $6,210,000)

 

(Design and Contingencies - $690,000)

 

(iii)  Greensburg Headquarters, Westmoreland County

 

(A)  Construct new headquarters facility

 

Project Allocation

16,500,000

(Base Project Allocation - $15,000,000)

 

(Design and Contingencies - $1,500,000)

 

(11)  State System of Higher Education

 

(i)  Bloomsburg University

 

(A)  Additional funding for DGS Project 401-60, Sutliff Hall addition

 

Project Allocation

2,700,000

(B)  Additional funding for Waller Administration Building renovation

 

Project Allocation

15,000,000

(C)  McCormick Center renovation

 

Project Allocation

19,000,000

(D)  Provide for deferred maintenance needs and capital renewal repairs

 

Project Allocation

4,000,000

(i.1)  California University

 

(A)  Renovate Coover Hall to bring into compliance and to minimize future expenses

 

Project Allocation

14,500,000

(Base Project Allocation - $11,600,000)

 

(Design and Contingencies - $2,900,000)

 

(B)  Additional funding for pedestrian and vehicular enhancements, Phase 1

 

Project Allocation

1,000,000

(C)  Provide for deferred maintenance needs and capital renewal repairs

 

Project Allocation

6,000,000

(ii)  Cheyney University

 

(A)  Demolish underutilized and obsolete buildings

 

Project Allocation

5,600,000

(Base Project Allocation - $4,480,000)

 

(Design and Contingencies - $1,120,000)

 

(B)  Construction, redevelopment and other related costs for reusing an outdated building as a regional technology center

 

Project Allocation

2,000,000

(C)  Additional funding for DGS Project 403-82, Carver Science Building renovation

 

Project Allocation

10,000,000

(D)  Additional funding for DGS Project 403-81, new student housing construction, Phase 1

 

Project Allocation

5,000,000

(E)  Cope Hall renovation or replacement

 

Project Allocation

45,000,000

(F)  Provide for deferred maintenance needs and capital renewal repairs

 

Project Allocation

9,000,000

(ii.1)  Clarion University

 

(A)  Additional funding for Tippin Gymnasium renovation/expansion

 

Project Allocation

2,500,000

(B)  Additional funding for Becker Hall renovation

 

Project Allocation

14,000,000

(C)  Provide for deferred maintenance needs and capital renewal repairs

 

Project Allocation

10,000,000

(ii.2)  East Stroudsburg University

 

(A)  Information Commons construction, Phase 1

 

Project Allocation

36,000,000

(B)  Information Commons construction, Phase 2

 

Project Allocation

40,000,000

(C)  Provide for deferred maintenance needs and capital renewal repairs

 

Project Allocation

8,000,000

(ii.3)  Edinboro University

 

(A)  Additional funding for DGS Project 406-51, Cooper Science renovation

 

Project Allocation

7,000,000

(B)  Ross Hall renovation or replacement

 

Project Allocation

1,500,000

(C)  Additional funding for maintenance building replacement

 

Project Allocation

3,000,000

(D)  Additional funding for DGS Project 406-51, Human Services Building renovation

 

Project Allocation

1,500,000

(E)  Provide for deferred maintenance needs and capital renewal repairs

 

Project Allocation

8,000,000

(ii.4)  Indiana University of Pennsylvania

 

(A)  Additional funding for Keith Hall renovation

 

Project Allocation

4,000,000

(B)  Additional funding for Leonard Hall renovation

 

Project Allocation

2,000,000

(C)  Weyandt/Walsh Hall renovation or replacement

 

Project Allocation

90,000,000

(D)  Provide for deferred maintenance needs and capital renewal repairs

 

Project Allocation

8,000,000

(iii)  Kutztown University

 

(A)  Construct new 69K electrical substation to meet requirements

 

Project Allocation

8,000,000

(Base Project Allocation - $6,000,000)

 

(Design and Contingencies - $2,000,000)

 

(B)  Additional funding for DGS Project 408-63, maintenance building upgrade, Phase 1, garage demolition

 

Project Allocation

2,000,000

(C)  DeFrancesco Education Building renovation

 

Project Allocation

13,000,000

(D)  Poplar House renovation/addition

 

Project Allocation

5,000,000

(E)  Provide for deferred maintenance needs and capital renewal repairs

 

Project Allocation

9,000,000

(iv)  Lock Haven University

 

(A)  Additional funding to continue the upgrade of fiber optics in all buildings

 

Project Allocation

2,000,000

(Base Project Allocation - $1,600,000)

 

(Design and Contingencies - $400,000)

 

(B)  Construction, infrastructure, redevelopment and other related costs to renovate South Ulmer Hall

 

Project Allocation

4,700,000

(C)  Construction, infrastructure, redevelopment and other related costs for the demolition of various buildings on campus

 

Project Allocation

850,000

(D)  Construction and other related costs for a new Science Center

 

Project Allocation

4,000,000

(E)  Additional funding for renovation and construction of Science and Math Center, East Campus

 

Project Allocation

900,000

(F)  Electrical infrastructure renovation

 

Project Allocation

10,000,000

(G)  Provide for deferred maintenance needs and capital renewal repairs

 

Project Allocation

6,000,000

(iv.1)  Mansfield University

 

(A)  Straughn Auditorium renovation

 

Project Allocation

6,000,000

(B)  New student housing construction

 

Project Allocation

25,000,000

(C)  Provide for deferred maintenance needs and capital renewal repairs

 

Project Allocation

5,000,000

(v)  Millersville University

 

(A)  Rehabilitate university's electrical distribution system

 

Project Allocation

3,500,000

(Base Project Allocation - $2,800,000)

 

(Design and Contingencies - $700,000)

 

(B)  Pennsylvania Academy of Music property acquisition and building modifications

 

Project Allocation

1,000,000

(C)  Additional funding for DGS Project 411-62, electrical utilities upgrade

 

Project Allocation

6,000,000

(D)  Additional funding for DGS Project 411-64, Ganser Library renovation

 

Project Allocation

10,000,000

(E)  Additional funding for Stayer Building renovation

 

Project Allocation

6,000,000

(F)  Provide for deferred maintenance needs and capital renewal repairs

 

Project Allocation

4,000,000

(v.1)  Pennsylvania State System of Higher Education Universities

 

(A)  Demolition of obsolete and underutilized university buildings

 

Project Allocation

10,000,000

(vi)  Shippensburg University

 

(A)  Renovate telecommunications distribution system

 

Project Allocation

4,000,000

(Base Project Allocation - $3,000,000)

 

(Design and Contingencies - $1,000,000)

 

(B)  Franklin Science Center renovation

 

Project Allocation

15,000,000

(C)  Provide for deferred maintenance needs and capital renewal repairs

 

Project Allocation

12,000,000

(vii)  Slippery Rock University

 

(A)  Additional funding for DGS Project 413-45, Phase 3, central boiler plant renovation

 

Project Allocation

4,000,000

(B)  Patterson Hall renovation

 

Project Allocation

5,000,000

(C)  West Gym renovation

 

Project Allocation

5,000,000

(D)  Additional funding for McKay Building renovation/addition

 

Project Allocation

10,000,000

(E)  Student Success Center renovation

 

Project Allocation

15,000,000

(F)  Provide for deferred maintenance needs and capital renewal repairs

 

Project Allocation

8,000,000

(viii)  West Chester University

 

(A)  Mitchell Hall renovation

 

Project Allocation

1,500,000

(B)  Additional funding for Undergraduate Business Center

 

Project Allocation

1,000,000

(C)  Geothermal utility and heating plant conversion, Phase 2

 

Project Allocation

17,000,000

(D)  Main Hall replacement

 

Project Allocation

40,000,000

(E)  Provide for deferred maintenance needs and capital renewal repairs

 

Project Allocation

12,000,000

(12)  Department of Transportation

 

(i)  Allegheny County

 

(A)  Construct new vehicle wash building at the Allegheny County maintenance garage

 

Project Allocation

690,000

(Base Project Allocation - $600,000)

 

(Design and Contingencies - $90,000)

 

(B)  Construct new service/pm building for the Allegheny County maintenance facility at the Allegheny County Tunnel-Liberty necessary to meet program requirements and building deficiencies

 

Project Allocation

2,750,000

(Base Project Allocation - $2,500,000)

 

(Design and Contingencies - $250,000)

 

(C)  Dismantle and construct, including repair, retrofit and/or replacement, of two salt storage buildings

 

Project Allocation

700,000

(ii)  Armstrong County

 

(A)  Renovate and expand Armstrong County maintenance facility to upgrade building's system, improve program requirements and energy efficiency

 

Project Allocation

1,150,000

(Base Project Allocation - $1,000,000)

 

(Design and Contingencies - $150,000)

 

(ii.1)  Beaver County

 

(A)  Dismantle and construct, including repair, retrofit and/or replacement, of one salt storage building

 

Project Allocation

350,000

(iii)  Bedford County

 

(A)  Renovate and expand Bedford County maintenance facility to bring building into code compliance; upgrade building's systems, improve program requirements and energy efficiency

 

 

 

 

Project Allocation

575,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $75,000)

 

(iv)  Berks County

 

(A)  Renovate and expand Berks County maintenance facility to bring building into code compliance; upgrade building's systems, improve program requirements and energy efficiency

 

Project Allocation

575,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $75,000)

 

(v)  Blair County

 

(A)  Renovate and expand Blair County District 9-0 Office to bring building into code compliance; upgrade building's systems, improve program requirements and energy efficiency

 

Project Allocation

345,000

(Base Project Allocation - $300,000)

 

(Design and Contingencies - $45,000)

 

(B)  Install emergency generator and repoint building exterior at District 9-0 Office to meet program requirements and building deficiencies

 

Project Allocation

545,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $45,000)

 

(C)  Construct new stockpile facility, including site development, design and construction of all required buildings

 

Project Allocation

1,665,000

(Base Project Allocation - $1,500,000)

 

(Land Allocation - $15,000)

 

(Design and Contingencies - $150,000)

 

(vi)  Bradford County

 

(A)  Renovate and expand Bradford County maintenance facility to bring building into code compliance; upgrade building's systems, improve program requirements and energy efficiency

 

Project Allocation

575,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $75,000)

 

(vii)  Bucks County

 

(A)  Renovate and expand Bucks County Welcome Center RSR Site P or construct new facility, including parking lots, restrooms, display areas, tourism service area, patios, picnic areas, ramps, enhanced ADA accessibility and any necessary building code-related enhancements

 

Project Allocation

9,775,000

(Base Project Allocation - $8,500,000)

 

(Design and Contingencies - $1,275,000)

 

(viii)  Butler County

 

(A)  Renovate and expand Butler County maintenance facility to bring building into code compliance; upgrade building's systems, improve program requirements and energy efficiency

 

Project Allocation

2,875,000

(Base Project Allocation - $2,500,000)

 

(Design and Contingencies - $375,000)

 

(ix)  Cambria County

 

(A)  Renovate and expand Cambria County maintenance facility to bring building into code compliance; upgrade building's systems, improve program requirements and energy efficiency

 

Project Allocation

575,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $75,000)

 

(B)  Dismantle and construct, including repair, retrofit and/or replacement, of one salt storage building

 

Project Allocation

475,000

(x)  Cameron County

 

(A)  Renovate and expand Cameron County maintenance facility to bring building into code compliance, roof, upgrade building's systems, improve program requirements and energy efficiency

 

Project Allocation

675,000

(Base Project Allocation - $600,000)

 

(Design and Contingencies - $75,000)

 

(xi)  Carbon County

 

(A)  Renovate and expand Carbon County maintenance facility to bring building into code compliance; upgrade building's systems, improve program requirements and energy efficiency

 

Project Allocation

575,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $75,000)

 

(xii)  Centre County

 

(A)  Construct new stand-alone paint crew facility at the Centre County maintenance facility necessary to meet program requirements and building deficiencies

 

Project Allocation

575,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $75,000)

 

(xii.1)  Chester County

 

(A)  Dismantle and construct, including repair, retrofit and/or replacement, of one salt storage building

 

Project Allocation

355,000

(xiii)  Clarion County

 

(A)  Renovate and expand Clarion County maintenance facility to bring building into code compliance; upgrade building's systems, improve program requirements and energy efficiency

 

Project Allocation

862,000

(Base Project Allocation - $750,000)

 

(Design and Contingencies - $112,000)

 

(xiv)  Clearfield County

 

(A)  Construct new stand alone paint crew facility at the Clearfield County maintenance facility necessary to meet program requirements and building deficiencies

 

Project Allocation

575,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $75,000)

 

(xv)  Clinton County

 

(A)  Renovate, expand and improve water system and sewage treatment plant facility at Sites 33/34 safety rest areas to bring buildings into code compliance; upgrade buildings' systems, roofs, improve program requirements and energy efficiency

 

Project Allocation

550,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $50,000)

 

(xvi)  Columbia County

 

(A)  Renovate, expand and improve water system and sewage treatment plant facility at Sites 37/38 safety rest areas to bring buildings into code compliance; upgrade buildings' systems, roofs, improve program requirements and energy efficiency

 

Project Allocation

550,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $50,000)

 

(xvii)  Crawford County

 

(A)  Renovate and expand Crawford County maintenance facility to bring building into code compliance, roof, upgrade building's systems, improve program requirements and energy efficiency

 

Project Allocation

675,000

(Base Project Allocation - $600,000)

 

(Design and Contingencies - $75,000)

 

(B)  Dismantle and construct, including repair, retrofit and/or replacement, of three salt storage buildings

 

Project Allocation

1,050,000

(xvii.1)  Cumberland County

 

(A)  Dismantle and construct, including repair, retrofit and/or replacement, of one salt storage building

 

Project Allocation

355,000

(xviii)  Dauphin County

 

(A)  Demolish old Dauphin County materials testing facility

 

Project Allocation

2,200,000

(Base Project Allocation - $2,000,000)

 

(Design and Contingencies - $200,000)

 

(B)  Demolish existing Site 47 rest area and construct new facility with expanded vehicle and truck parking lots

 

Project Allocation

5,500,000

(Base Project Allocation - $5,000,000)

 

(Design and Contingencies - $500,000)

 

(C)  Demolish existing Site 48 rest area and construct new facility with expanded vehicle and truck parking lots

 

Project Allocation

5,500,000

(Base Project Allocation - $5,000,000)

 

(Design and Contingencies - $500,000)

 

(D)  Upgrade water system and HVAC to obtain Tier 3 level designation at PennDOT Server Farm

 

Project Allocation

2,200,000

(Base Project Allocation - $2,000,000)

 

(Design and Contingencies - $200,000)

 

(xix)  Delaware County

 

(A)  Renovate and expand Delaware County maintenance facility to bring building into code compliance; upgrade building's systems, improve program requirements and energy efficiency

 

Project Allocation

1,380,000

(Base Project Allocation - $1,200,000)

 

(Design and Contingencies - $180,000)

 

(xx)  Erie County

 

(A)  Renovate and expand Erie County maintenance facility to bring building into code compliance; upgrade building's systems, improve program requirements and energy efficiency

 

Project Allocation

862,000

(Base Project Allocation - $750,000)

 

(Design and Contingencies - $112,000)

 

(B)  Dismantle and construct, including repair, retrofit and/or replacement, of six salt storage buildings

 

Project Allocation

2,100,000

(xxi)  Fayette County

 

(A)  Renovate and expand Fayette County maintenance facility to bring building into code compliance; upgrade building's systems, improve program requirements and energy efficiency

 

Project Allocation

575,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $75,000)

 

(B)  Construct new salt storage building to meet program requirements and winter operations

 

Project Allocation

575,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $75,000)

 

(C)  Dismantle and construct, including repair, retrofit and/or replacement, of six salt storage buildings

 

Project Allocation

2,100,000

(D)  Dismantle and construct, including repair, retrofit and/or replacement, of five salt storage buildings

 

Project Allocation

1,750,000

(xxi.1)  Forest County

 

(A)  Dismantle and construct, including repair, retrofit and/or replacement, of one salt storage building

 

Project Allocation

350,000

(xxii)  Franklin County

 

(A)  Renovate and expand Franklin County maintenance facility to bring building into code compliance; upgrade building's systems, improve program requirements and energy efficiency

 

Project Allocation

575,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $75,000)

 

(xxiii)  Fulton County

 

(A)  Renovate and expand Fulton County maintenance facility to bring building into code compliance; upgrade building's systems, improve program requirements and energy efficiency

 

Project Allocation

575,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $75,000)

 

(B)  Renovate, expand and improve water system and sewage treatment plant facility at Site 3 safety rest area to bring building into code compliance; upgrade building's systems, roof, improve program requirements and energy efficiency

 

Project Allocation

550,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $50,000)

 

(C)  Renovate, expand and improve water system and sewage treatment plant facility at Site B safety rest area/welcome center to bring building into code compliance; upgrade building's systems, roof, improve program requirements and energy efficiency

 

Project Allocation

550,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $50,000)

 

(xxiii.1)  Greene County

 

(A)  Dismantle and construct, including repair, retrofit and/or replacement, of one salt storage building

 

Project Allocation

300,000

(xxiv)  Huntingdon County

 

(A)  Develop new stockpile facility for Huntingdon County maintenance facility at Pine Grove Mountain to include site development, design and construction of all required buildings

 

Project Allocation

1,530,000

(Base Project Allocation - $1,500,000)

 

(Land Allocation - $15,000)

 

(Design and Contingencies - $15,000)

 

(B)  Dismantle and construct, including repair, retrofit and/or replacement, of one salt storage building

 

Project Allocation

350,000

(xxv)  Indiana County

 

(A)  Renovate and expand Indiana County maintenance facility to bring building into code compliance; upgrade building's systems, improve program requirements and energy efficiency

 

Project Allocation

2,300,000

(Base Project Allocation - $2,000,000)

 

(Design and Contingencies - $300,000)

 

(xxvi)  Jefferson County

 

(A)  Renovate and expand Jefferson County maintenance facility to bring building into code compliance; upgrade building's systems, improve program requirements and energy efficiency

 

Project Allocation

1,150,000

(Base Project Allocation - $1,000,000)

 

(Design and Contingencies - $150,000)

 

(xxvii)  Juniata County

 

(A)  Renovate and expand Juniata County maintenance facility to bring building into code compliance; upgrade building's systems, improve program requirements and energy efficiency

 

Project Allocation

575,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $75,000)

 

(xxviii)  Lackawanna County

 

(A)  Renovate and expand Lackawanna District 4-0 office to bring building into code compliance; upgrade building's systems, improve program requirements and energy efficiency

 

Project Allocation

1,800,000

(Base Project Allocation - $1,500,000)

 

(Design and Contingencies - $300,000)

 

(B)  Renovate and expand existing parking lot and entrance/exit ramps to accommodate additional parking for RSR Site 55 on I-81NB

 

Project Allocation

2,300,000

(Base Project Allocation - $2,000,000)

 

(Design and Contingencies - $300,000)

 

(xxix)  Lawrence County

 

(A)  Construct new vehicle wash building at the Lawrence County maintenance garage

 

Project Allocation

690,000

(Base Project Allocation - $600,000)

 

(Design and Contingencies - $90,000)

 

(B)  Renovate and expand Lawrence County maintenance facility to bring building into code compliance; upgrade building's systems, improve program requirements and energy efficiency

 

Project Allocation

1,725,000

(Base Project Allocation - $1,500,000)

 

(Design and Contingencies - $225,000)

 

(C)  Dismantle and construct, including repair, retrofit and/or replacement, of one salt storage building

 

Project Allocation

350,000

(xxx)  Lebanon County

 

(A)  Renovate and expand Lebanon County maintenance facility to bring building into code compliance; upgrade building's systems, improve program requirements and energy efficiency

 

Project Allocation

575,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $75,000)

 

(B)  Dismantle and construct, including repair, retrofit and/or replacement, of one salt storage building

 

Project Allocation

540,000

(xxxi)  Lehigh County

 

(A)  Renovate exterior site improvements, including sidewalks, necessary to meet program requirements and building deficiencies of the Lehigh District 5-0 office facility

 

Project Allocation

575,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $75,000)

 

(xxxii)  Luzerne County

 

(A)  Demolish old Luzerne County maintenance facility and construct new facility

 

Project Allocation

1,100,000

(Base Project Allocation - $1,000,000)

 

(Design and Contingencies - $100,000)

 

(xxxiii)  Lycoming County

 

(A)  Renovate and expand Lycoming County maintenance facility to bring building into code compliance; upgrade building's systems, improve program requirements and energy efficiency

 

Project Allocation

575,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $75,000)

 

(B)  Dismantle and construct, including repair, retrofit and/or replacement, of one salt storage building

 

Project Allocation

350,000

(xxxiv)  McKean County

 

(A)  Renovate and expand McKean County maintenance facility to bring building into code compliance; upgrade building's systems, improve program requirements and energy efficiency

 

Project Allocation

575,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $75,000)

 

(xxxv)  Mercer County

 

(A)  Renovate and expand Mercer County welcome center/roadside rest area or construct new facility, including parking lots, restrooms, display areas, tourism service area, patios, picnic areas, ramps, enhanced ADA accessibility and any necessary building code-related enhancements

 

Project Allocation

9,775,000

(Base Project Allocation - $8,500,000)

 

(Design and Contingencies - $1,275,000)

 

(B)  Dismantle and construct, including repair, retrofit and/or replacement, of four salt storage buildings

 

Project Allocation

1,400,000

(xxxvi)  Mifflin County

 

(A)  Renovate and expand Mifflin County maintenance facility to bring building into code compliance, roof, upgrade building's systems, improve program requirements and energy efficiency

 

Project Allocation

675,000

(Base Project Allocation - $600,000)

 

(Design and Contingencies - $75,000)

 

(xxxvii)  Monroe County

 

(A)  Renovate and expand Monroe County maintenance facility to bring building into code compliance; upgrade building's systems, improve program requirements and energy efficiency

 

Project Allocation

460,000

(Base Project Allocation - $400,000)

 

(Design and Contingencies - $60,000)

 

(B)  Repair, replace and expand existing vehicle and truck parking lots at the Site 41 roadside rest area located on I-80 eastbound in Monroe County

 

Project Allocation

550,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $50,000)

 

(C)  Dismantle and construct, including repair, retrofit and/or replacement, of one salt storage building

 

Project Allocation

350,000

(xxxviii)  Montgomery County

 

(A)  Renovate and expand Montgomery County maintenance facility to bring building into code compliance; upgrade building's systems, improve program requirements and energy efficiency

 

Project Allocation

575,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $75,000)

 

(B)  Renovate and expand Montgomery District 6-0 office facility to bring building into code compliance; upgrade building's systems, improve program requirements and energy efficiency

 

Project Allocation

1,380,000

(Base Project Allocation - $1,200,000)

 

(Design and Contingencies - $180,000)

 

(C)  Construction, infrastructure improvements and other costs related to the Henderson Road/DeKalb Pike reconstruction project in Upper Merion Township

 

Project Allocation

290,000

(D)  Construction, infrastructure improvements and other costs related to the Ford Street Gateway Streetscape project in West Conshohocken Borough

 

Project Allocation

580,000

(xxxix)  Northampton County

 

(A)  Renovate and expand Northampton County maintenance facility to bring building into code compliance; upgrade building's systems, improve program requirements and energy efficiency

 

Project Allocation

575,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $75,000)

 

(xl)  Northumberland County

 

(A)  Renovate and expand Northumberland County maintenance facility to bring building into code compliance; upgrade building's systems, improve program requirements and energy efficiency

 

Project Allocation

575,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $75,000)

 

(xli)  Perry County

 

(A)  Renovate and expand Perry County maintenance facility to bring building into code compliance; upgrade building's systems, improve program requirements and energy efficiency

 

Project Allocation

575,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $75,000)

 

(xli.1)  Pike County

 

(A)  Dismantle and construct, including repair, retrofit and/or replacement, of one salt storage building

 

Project Allocation

350,000

(xlii)  Somerset County

 

(A)  Construct new stockpile facility, including site development, design and construction of all required buildings

 

Project Allocation

1,665,000

(Base Project Allocation - $1,500,000)

 

(Land Allocation - $15,000)

 

(Design and Contingencies - $150,000)

 

(B)  Dismantle and construct, including repair, retrofit and/or replacement, of one salt storage building

 

Project Allocation

350,000

(xlii.1)  Susquehanna County

 

(A)  Dismantle and construct, including repair, retrofit and/or replacement, of one salt storage building

 

Project Allocation

350,000

(B)  Dismantle and construct, including repair, retrofit and/or replacement, of one salt storage building

 

Project Allocation

350,000

(xliii)  Tioga County

 

(A)  Renovate and expand Tioga County maintenance facility to bring building into code compliance, roof, upgrade building's systems, improve program requirements and energy efficiency

 

Project Allocation

675,000

(Base Project Allocation - $600,000)

 

(Design and Contingencies - $75,000)

 

(xliv)  Venango County

 

(A)  Renovate and expand Venango County maintenance facility to bring building into code compliance; upgrade building's systems, improve program requirements and energy efficiency

 

Project Allocation

575,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $75,000)

 

(B)  Replace elevators in District Office 1-0 to meet current ADA code requirements

 

Project Allocation

825,000

(Base Project Allocation - $750,000)

 

(Design and Contingencies - $75,000)

 

(C)  Dismantle and construct, including repair, retrofit and/or replacement, of six salt storage buildings

 

Project Allocation

2,100,000

(xlv)  Warren County

 

(A)  Renovate and expand Warren County maintenance facility to bring building into code compliance; upgrade building's systems, improve program requirements and energy efficiency

 

Project Allocation

575,000

(Base Project Allocation - $500,000)

 

(Design and Contingencies - $75,000)

 

(B)  Dismantle and construct, including repair, retrofit and/or replacement, of two salt storage buildings

 

Project Allocation

700,000

(xlvi)  Washington County

 

(A)  Dismantle and construct, including repair, retrofit and/or replacement, of one salt storage building

 

Project Allocation

350,000

(B)  Dismantle and construct, including repair, retrofit and/or replacement, of two salt storage buildings

 

Project Allocation

800,000

(xlvi.1)  Wayne County

 

(A)  Dismantle and construct, including repair, retrofit and/or replacement, of one salt storage building

 

Project Allocation

400,000

(xlvii)  Westmoreland County

 

(A)  Dismantle and construct, including repair, retrofit and/or replacement, of two salt storage buildings

 

Project Allocation

700,000

(B)  Dismantle and construct, including repair, retrofit and/or replacement, of one salt storage building

 

Project Allocation

400,000

(xlvii.1)  Wyoming County

 

(A)  Dismantle and construct, including repair, retrofit and/or replacement, of four salt storage buildings

 

Project Allocation

1,300,000

(xlviii)  Philadelphia and Delaware Counties

 

(A)  Deepen Delaware River from 40 to 45 feet

 

Project Allocation

50,000,000

(13)  Philadelphia Regional Port Authority

 

(i)  Philadelphia County

 

(A)  Rehabilitation, renovations, construction and other redevelopment costs for improvements to the Pier 78 Annex

 

Project Allocation

600,000

(B)  Renovations and construction of pier facilities and warehouses at the Tioga Marine Terminal, including the abatement of hazardous materials and other related redevelopment costs

 

Project Allocation

600,000

(C)  Ten-year maintenance dredging of all Philadelphia Regional Port Authority slips and berths

 

Project Allocation

20,000,000

(D)  General improvements to rail access for port terminals

 

Project Allocation

15,000,000

(E)  General improvements to port facilities

 

Project Allocation

50,000,000

(F)  Improved security systems for port facilities

 

Project Allocation

5,000,000

(13.1)  Treasury Department

 

(i)  Technology and Business Process Transformation and Modernization Initiative

 

(A)  Improve, equip and transition the existing technology structure housed within the Finance Building to a secure and efficient architecture capable of supporting the agency's fiscal obligations, increasing automation, improving efficiency and enhancing public commerce by efficiently disbursing public funds while maintaining the agency's independent oversight of Commonwealth expenditures with a useful life in excess of ten years

 

Project Allocation

50,000,000

 

20100082u3v

 

Compiler's Note:  The Department of Public Welfare, referred to in this section, was redesignated as the Department of Human Services by Act 132 of 2014.

20100082u4s

Section 4.  Itemization of furniture and equipment projects.

Additional capital projects in the category of public improvement projects consisting of the acquisition of movable furniture and equipment to complete public improvement projects and to be purchased by the Department of General Services, its successors or assigns and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:

 

Project

Total Project Allocation

(1)  Department of Agriculture

 

(A)  Original furnishings and equipment for  DGS Project 0700-0042, renovation and/or addition of existing facility in Harrisburg to provide for biosecurity Level 3 capabilities

 

Project Allocation

446,000

(Base Project Allocation - $446,000)

 

(2)  Department of Conservation and Natural Resources

 

(i)  Kinzua Bridge State Park

 

(A)  Original furnishings and equipment for the new office/visitors center

 

Project Allocation

3,000,000

(Base Project Allocation - $2,400,000)

 

(Design and Contingencies - $600,000)

 

(ii)  S.B. Elliott State Park

 

(A)  Additional funds for exhibits, furnishings and equipment to complete visitor center and overnight lodge facility within the park

 

Project Allocation

3,500,000

(Base Project Allocation - $2,800,000)

 

(Design and Contingencies - $700,000)

 

(iii)  Sinnemahoning State Park

 

(A)  Original furnishings and equipment for the new office/visitors center

 

Project Allocation

2,000,000

(Base Project Allocation - $1,600,000)

 

(Design and Contingencies - $400,000)

 

(iv)  Multiple State Parks, Statewide

 

(A)  Original furniture and equipment for various Statewide projects

 

Project Allocation

3,500,000

(Base Project Allocation - $2,800,000)

 

(Design and Contingencies - $700,000)

 

(3)  Department of Corrections

 

(i)  State Correctional Institution at Graterford

 

(A)  Original furniture and equipment for the new L-4 close security institution at SCI Graterford

 

Project Allocation

6,500,000

(4)  Department of Education

 

(i)  Butler County Community College

 

(A)  Furniture and classroom technology and equipment for the Linden Pointe campus

 

Project Allocation

525,000

(ii)  Lincoln University

 

(A)  Original furniture and equipment for Vail Hall

 

Project Allocation

2,000,000

(Base Project Allocation - $1,600,000)

 

(Design and Contingencies - $400,000)

 

(B)  Original furniture and equipment for Lincoln Hall

 

Project Allocation

2,000,000

(Base Project Allocation - $1,600,000)

 

(Design and Contingencies - $400,000)

 

(C)  Original furniture and equipment for Azikiwe-Nkrumah Hall

 

Project Allocation

1,500,000

(Base Project Allocation - $1,200,000)

 

(Design and Contingencies - $300,000)

 

(iii)  The Pennsylvania State University

 

(A)  Original furniture and equipment for Henning Building

 

Project Allocation

3,000,000

(Base Project Allocation - $3,000,000)

 

(B)  Original furniture and equipment for renovations of a chemical ecology laboratory at University Park

 

Project Allocation

1,200,000

(C)  Original furniture and equipment for medical facilities at Hershey Medical Center

 

Project Allocation

28,500,000

(D)  Original furniture and equipment for research and teaching greenhouse upgrades at University Park

 

Project Allocation

2,800,000

(E)  Original furniture and equipment for the Emergency Radio Network at University Park

 

Project Allocation

400,000

(F)  Capital renewal at University Park

 

Project Allocation

4,000,000

(G)  Capital renewal at central region campuses

 

Project Allocation

300,000

(H)  Capital renewal at eastern region campuses

 

Project Allocation

300,000

(I)  Capital renewal at western region campuses

 

Project Allocation

300,000

(J)  Original furniture and equipment for a computer building at University Park

 

Project Allocation

3,500,000

(K)  Original furniture and equipment for the Hetzel Union Building at University Park

 

Project Allocation

4,000,000

(L)  Original furniture and equipment for a water treatment facility at University Park

 

Project Allocation

3,000,000

(M)  Additional funding for original furniture and equipment at Henderson South-University Park

 

Project Allocation

5,000,000

(N)  Original furniture and equipment for a power plant conversion project at University Park

 

Project Allocation

3,000,000

(O)  Original furniture and equipment for renovations and additions to residence halls at University Park

 

Project Allocation

6,000,000

(P)  Original furniture and equipment for renovations and new construction of residence halls located at non-University Park campuses

 

Project Allocation

5,000,000

(iv)  Temple University

 

(A)  Original furniture and equipment for Honors Program house

 

Project Allocation

3,000,000

(Base Project Allocation - $2,400,000)

 

(Design and Contingencies - $600,000)

 

(5)  Department of Military and Veterans Affairs

 

(i)  Southeastern Veterans' Center, Chester County

 

(A)  Provide additional funding for Project 960-55 for furniture, fixtures and equipment

 

Project Allocation

2,000,000

(Base Project Allocation - $2,000,000)

 

(ii)  Fort Indiantown Gap Readiness Center, Lebanon County

 

(A)  Purchase furniture, fixtures and equipment for DGS Project 962-20

 

Project Allocation

3,000,000

(Base Project Allocation - $3,000,000)

 

(6)  State System of Higher Education

 

(i)  Bloomsburg University

 

(A)  Waller Administration Building renovation

 

Project Allocation

2,200,000

(ii)  Cheyney University

 

(A)  Carver Science Building renovation

 

Project Allocation

2,100,000

(B)  New student housing construction

 

Project Allocation

4,500,000

(iii)  Clarion University

 

(A)  Additional funding for Tippin Gymnasium renovation/expansion

 

Project Allocation

2,500,000

(iv)  East Stroudsburg University

 

(A)  Information Commons construction, Phase 1

 

Project Allocation

3,600,000

(v)  Edinboro University

 

(A)  Additional funding for Cooper Science renovation

 

Project Allocation

1,000,000

(B)  Ross Hall renovation or replacement

 

Project Allocation

1,500,000

(C)  Additional funding for maintenance building replacement

 

Project Allocation

650,000

(vi)  Indiana University of Pennsylvania

 

(A)  Additional funding for Keith Hall renovation

 

Project Allocation

2,000,000

(B)  Additional funding for Leonard Hall renovation

 

Project Allocation

2,000,000

(C)  Weyandt/Walsh Hall renovation or replacement

 

Project Allocation

9,000,000

(vii)  Lock Haven University

 

(A)  Additional funding for renovation and construction of Science and Math Center, east campus

 

Project Allocation

900,000

(viii)  Mansfield University

 

(A)  Straughn Auditorium renovation

 

Project Allocation

1,000,000

(ix)  Millersville University

 

(A)  Ganser Library renovation

 

Project Allocation

1,600,000

(B)  Pennsylvania Academy of Music property acquisition and building modifications

 

Project Allocation

1,000,000

(C)  Stayer Building renovation

 

Project Allocation

1,000,000

(x)  Slippery Rock University

 

(A)  Original furniture and equipment for McKay Building

 

Project Allocation

2,000,000

(Base Project Allocation - $2,000,000)

 

(xi)  West Chester University

 

(A)  Mitchell Hall renovation

 

Project Allocation

1,500,000

(B)  Additional funding for undergraduate business center

 

Project Allocation

1,000,000

(7)  Treasury Department

 

(i)  Technology and Business Process Transformation and Modernization Initiative

 

(A)  Improve, equip and transition the existing technology structure housed within the Finance Building to a secure and efficient architecture capable of supporting the agency's fiscal obligations, increasing automation, improving efficiency and enhancing public commerce by efficiently disbursing public funds while maintaining the agency's independent oversight of Commonwealth expenditures with a useful life in excess of ten years

 

Project Allocation

50,000,000

20100082u5s

Section 5.  Itemization of transportation assistance projects.

(a)  Mass transit.--Additional capital projects in the category of transportation assistance projects for mass transit in which an interest is to be acquired or constructed by the Department of Transportation, its successors or assigns and to be financed by the incurring of debt are hereby itemized, together with their estimated financial costs, as follows:

 

Project

Total Project Allocation

(1)  Area Transportation Authority

 

(i)  Provide for bus replacements, including 13 heavy duty mass transit vehicles and up to 27 Sprinter vehicles

 

Project Allocation

870,000

(Base Project Allocation - $783,000)

 

(Design and Contingencies - $87,000)

 

(ii)  Purchase transit vehicles and upgrade facility

 

Project Allocation

2,000,000

(Base Project Allocation - $1,800,000)

 

(Design and Contingencies - $200,000)

 

(2)  Berks Area Reading Transportation Authority

 

(i)  Provide for replacement of ten paratransit vehicles and purchase of an automatic vehicle locator system

 

Project Allocation

239,000

(Base Project Allocation - $215,000)

 

(Design and Contingencies - $24,000)

 

(2.1)  Bucks County

 

(i)  Reconstruction of Clymer Avenue Bridge, County Bridge No. 234, in West Rockhill Township

 

Project Allocation

2,000,000

(3)  Centre Area Transportation Authority

 

(i)  Additional funding to replace CNG compressors at the CNG fueling station and to replace ten CNG transit buses

 

Project Allocation

522,000

(Base Project Allocation - $470,000)

 

(Design and Contingencies - $52,000)

 

(ii)  Provide for second phase of Advanced Public Transportation System, an automatic vehicle locator system and the purchase of 12 new vans, expansion of two additional vanpools and facility improvements, and replacement of roof membrane over maintenance and bus storage areas of the facility

 

Project Allocation

183,000

(Base Project Allocation - $165,000)

 

(Design and Contingencies - $18,000)

 

(iii)  Purchase buses to add to current fleet for expanded service, replace diesel buses that have met their useful life and refurbish bus lanes in front of transit center to load wheelchairs

 

Project Allocation

1,000,000

(Base Project Allocation - $900,000)

 

(Design and Contingencies - $100,000)

 

(3.1)  City of Washington

 

(i)  Replace two transit buses which have met their useful life

 

Project Allocation

142,000

(Base Project Allocation - $128,000)

 

(Design and Contingencies - $14,000)

 

(4)  Crawford Area Transportation Authority

 

(i)  Provide additional funding for the authority's intermodal/administrative facility

 

Project Allocation

266,000

(Base Project Allocation - $239,000)

 

(Design and Contingencies - $27,000)

 

(ii)  Construct steel structure sheltered bus storage facility and wash bay for bus fleet

 

Project Allocation

194,000

(Base Project Allocation - $175,000)

 

(Design and Contingencies - $19,000)

 

(5)  Dauphin County

 

(i)  Construct a mass transit station, including infrastructure and other related costs

 

Project Allocation

10,600,000

(5.1)  Erie Metropolitan Transit Authority

 

(i)  Land acquisition, demolition, infrastructure improvements, renovations and rehabilitation and other related costs for the construction of a new joint operations facility

 

Project Allocation

5,000,000

(6)  Fayette Area Coordinated Transportation

 

(i)  Provide for replacement of a fixed-route vehicle, facility upgrades and transit equipment

 

Project Allocation

150,000

(Base Project Allocation - $135,000)

 

(Design and Contingencies - $15,000)

 

(6.1)  Lehigh County

 

(i)  For costs related to the purchase of test engines, test vehicle and fuel equipment to conduct testing of lean burn LoNox compressed natural gas engines at Air Products and Chemicals, Inc.

 

Project Allocation

750,000

(6.2)  Luzerne County

 

(i)  Construction, infrastructure and other costs related to the Hazleton intermodal facility, Phase II

 

Project Allocation

14,300,000

(7)  Mid Mon Valley Transit Authority

 

(i)  Replace three buses, modernize bus maintenance facility for bus storage and refurbish bus lanes in front of the transit center to load wheelchair passengers more safely

 

Project Allocation

588,000

(Base Project Allocation - $529,000)

 

(Design and Contingencies - $59,000)

 

(7.1)  Montgomery County

 

(i)  Renovation, construction and expansion of station facilities and parking at the Ardmore Station Transit Center in Lower Marion Township

 

Project Allocation

10,000,000

(ii)  Renovation, construction and expansion of station facilities at the Elkins Park East train station

 

Project Allocation

1,800,000

(8)  Port Authority of Allegheny County

 

(i)  Provide Alpine Village Park and Ride Facility for the complete design and construction of additional spaces at the park and ride located near the interchange of Routes 22 and 286 in Monroeville

 

Project Allocation

1,350,000

(Base Project Allocation - $1,215,000)

 

(Design and Contingencies - $135,000)

 

(ii)  FY 2010-2011 Section 5307 Program, replace and/or rehabilitate major components of bus- and fixed guide- way system

 

Project Allocation

7,020,000

(Base Project Allocation - $6,318,000)

 

(Design and Contingencies - $702,000)

 

(iii)  FY 2010-2011 Section 5309 Program, replace and/or rehabilitate major components within Authority's rail- and bus- way system

 

Project Allocation

5,349,000

(Base Project Allocation - $4,814,000)

 

(Design and Contingencies - $535,000)

 

(iv)  FY 2010-2011 Section 5307 Flex Program, provide replacement buses, light rail vehicle mid-life overhaul, light rail extension and expand Authority's Alpine Village Park and Ride facility

 

Project Allocation

1,493,000

(Base Project Allocation - $1,344,000)

 

(Design and Contingencies - $149,000)

 

(v)  FY 2010-2011 Infrastructure Safety Renewal Program, including improvements to stations, signals, track, power and buildings

 

Project Allocation

16,000,000

(Base Project Allocation - $14,400,000)

 

(Design and Contingencies - $1,600,000)

 

(vi)  FY 2010-2011 Vehicle Overhaul Program, provide for major overhaul of rolling stock

 

Project Allocation

2,500,000

(Base Project Allocation - $2,250,000)

 

(Design and Contingencies - $250,000)

 

(9)  Red Rose Transit Authority

 

(i)  Replace mass transit buses which have met their useful life

 

Project Allocation

400,000

(Base Project Allocation - $360,000)

 

(Design and Contingencies - $40,000)

 

(ii)  Provide for communications improvements program and purchase of 12 shared-ride small transit vehicles

 

Project Allocation

202,000

(Base Project Allocation - $182,000)

 

(Design and Contingencies - $20,000)

 

(10)  Southeastern Pennsylvania Transportation Authority

 

(i)  Provide for purchase of 400 hybrid 40-foot low-floor transit buses to replace buses which have met their useful life

 

Project Allocation

521,000

(Base Project Allocation - $469,000)

 

(Design and Contingencies - $52,000)

 

(ii)  Provide improvements at the Croydon and Levittown stations in Bucks County

 

Project Allocation

3,500,000

(Base Project Allocation - $3,150,000)

 

(Design and Contingencies - $350,000)

 

(iii)  Provide improved intermodal connections between bus and rail at Glenside and Jenkintown stations, including parking

 

Project Allocation

6,700,000

(Base Project Allocation - $6,030,000)

 

(Design and Contingencies - $670,000)

 

(iv)  FFY 2010 Transit Enhancement Program, provide for bus purchase program, paratransit vehicle purchase, utility fleet renewal, Smart stations, new payment technologies, station accessibility, subway stations rehabilitation, track and catenary improvements, rail line, state of good repair improvements and substation improvement

 

Project Allocation

13,416,000

(Base Project Allocation - $12,074,000)

 

(Design and Contingencies - $1,342,000)

 

(v)  FFY 2010 Rail Modernization Program, provide for Smart stations, new payment technologies, station accessibility, subway station rehabilitation, rehabilitation of City Hall and 15th Street stations, track and catenary improvements, regional rail improvements, state of good repair improvements and substation improvements

 

Project Allocation

12,900,000

(Base Project Allocation - $11,610,000)

 

(Design and Contingencies - $1,290,000)

 

(vi)  FFY 2010 Transit Enhancement Program, provide for historic preservation, rehabilitation and related activities; bus shelters, landscaping, signage and enhanced access to transit for persons with disabilities

 

Project Allocation

420,000

(Base Project Allocation - $378,000)

 

(Design and Contingencies - $42,000)

 

(vii)  FFY 2010 Bus Purchase Program, provide for acquisition of 400 diesel/electric accessible 40-foot low-floor buses with a pricing option for an additional 80 buses which have met their useful life

 

Project Allocation

3,600,000

(Base Project Allocation - $3,240,000)

 

(Design and Contingencies - $360,000)

 

(viii)  FFY 2010 Federal Highway Flex Projects, upgrade warning devices of various railroad/highway grade crossings and construct capital projects to improve air quality and reduce congestion

 

Project Allocation

834,000

(Base Project Allocation - $751,000)

 

(Design and Contingencies - $83,000)

 

(ix)  FFY 2009-2010 Vehicle Overhaul Program, provide for major overhaul of rolling stock

 

Project Allocation

30,000,000

(Base Project Allocation - $27,000,000)

 

(Design and Contingencies - $3,000,000)

 

(x)  FFY 2009-2010 Infrastructure Safety Renewal Program, improve stations, signals, track, power and buildings

 

Project Allocation

33,000,000

(Base Project Allocation - $29,700,000)

 

(Design and Contingencies - $3,300,000)

 

(xi)  FFY 2008 Clean Fuels bus purchase, purchase 400 hybrid 40-foot low-floor transit buses with option to purchase 80 additional buses to replace buses which have met their useful life

 

Project Allocation

595,000

(Base Project Allocation - $535,000)

 

(Design and Contingencies - $60,000)

 

(xii)  Renovate Bucks County Intermodal, improve Levittown station, including replacement of station building and infrastructure, improve pedestrian tunnels and intersection

 

Project Allocation

2,845,000

(Base Project Allocation - $2,560,000)

 

(Design and Contingencies - $285,000)

 

(xiii)  Renovate Montgomery County stations, improve select SEPTA stations, including Jenkintown, Glenside and Noble

 

Project Allocation

4,742,000

(Base Project Allocation - $4,268,000)

 

(Design and Contingencies - $474,000)

 

(xiv)  Renovate Paoli station, provide engineering and construction of transportation center in Paoli, located west of existing station

 

Project Allocation

290,000

(Base Project Allocation - $261,000)

 

(Design and Contingencies - $29,000)

 

(xv)  Renovate Villanova Intermodal Station, design and construct high level platforms canopies for inbound and outbound service with new pedestrian tunnels and ADA compliant ramps and stairs

 

Project Allocation

4,471,000

(Base Project Allocation - $4,024,000)

 

(Design and Contingencies - $447,000)

 

(xvi)  Design and construct 425 space parking garage at 69th Street terminal, including ADA accessibility and pedestrian connections between new garage and existing terminal

 

Project Allocation

4,258,000

(Base Project Allocation - $3,832,000)

 

(Design and Contingencies - $426,000)

 

(xvii)  FFY 2011 Formula Program, acquire different size buses based upon needs and route characteristics in SEPTA's bus fleet management plan and state of good repair improvements

 

Project Allocation

16,955,000

(Base Project Allocation - $15,260,000)

 

(Design and Contingencies - $1,695,000)

 

(xviii)  FFY 2011 Rail Modernization Program, provide for station accessibility, City Hall station and 15th Street station rehabilitation, Elwyn to Wawa Rail service, Paoli line improvements, regional rail substation improvements, parking expansion program, transit and regional rail program, new payment technologies, paratransit vehicle purchase program, state of good repair improvements and utility fleet renewal

 

Project Allocation

15,822,000

(Base Project Allocation - $14,240,000)

 

(Design and Contingencies - $1,582,000)

 

(xix)  FFY 2011 Flex Program - Railroad/Highway Grade Crossing, support installation or upgrading of warning devices and renewal of highway grade crossing surfaces, improve air quality and reduce congestion

 

Project Allocation

705,000

(Base Project Allocation - $635,000)

 

(Design and Contingencies - $70,000)

 

(xx)  FFY 2011 Transit Enhancements, including historic preservation, rehabilitation and related activities: bus shelters; landscaping and other scenic beautification including street lights, public art, pedestrian access and walkways; bicycle access including storage facilities and installation of equipment for transporting bicycles on transit vehicles; transit connections to parks; signage and enhanced access to transit for persons with disabilities

 

Project Allocation

238,000

(Base Project Allocation - $214,000)

 

(Design and Contingencies - $24,000)

 

(xxi)  FFY 2010-2011 Vehicle Overhaul Program, provide for major overhaul of rolling stock

 

Project Allocation

30,000,000

(Base Project Allocation - $27,000,000)

 

(Design and Contingencies - $3,000,000)

 

(xxii)  FFY 2010-2011 Infrastructure Safety Renewal Program, including improvements to stations, signals, track, power and buildings

 

Project Allocation

33,000,000

(Base Project Allocation - $29,700,000)

 

(Design and Contingencies - $3,300,000)

 

(xxiii)  FFY 2008 additional funding for Formula Program, bring transit and railroad facilities into a state of good repair, provide for the reconstruction or rehabilitation of transit and regional rail stations and terminals, bus/trolley loop facilities and transportation centers

 

Project Allocation

550,000

(Base Project Allocation - $495,000)

 

(Design and Contingencies - $55,000)

 

(xxiv)  FFY 2010 additional funding for Formula Program, bring transit and railroad facilities into a state of good repair, acquisition of buses, purchase of vehicles for use on SEPTA paratransit services, upgrade and replace SEPTA'S utility fleet and automotive service fleet, vehicle overhaul program, Smart stations, new payment technologies, radio communications project, the rehabilitation/renovation of the existing fire suppression system at Elmwood bus garage and Frankford bus garage, historic station renovations, regional rail car procurement, upgrade to the Customized Community Transportation Control Center

 

Project Allocation

10,175,600

(Base Project Allocation - $9,158,040)

 

(Design and Contingencies - $1,017,560)

 

(xxv)  FFY 2010 additional funding for Rail Modernization Program, bring transit and railroad facilities into a state of good repair, vehicle overhaul program, rehabilitation of City Hall and 15th Street stations, improvements to the Jenkintown-Wyncote station, including ADA accessibility, passenger conveniences and parking, restoration of rail service from Elwyn, Delaware County, to a new terminus at Wawa, Delaware County, regional rail substation improvements, new payment technologies, historic station renovations and the Market Street Elevated Reconstruction Program

 

Project Allocation

2,684,200

(Base Project Allocation - $2,415,780)

 

(Design and Contingencies - $268,420)

 

(xxvi)  FFY 2010 additional funding for Bus Purchase Program

 

Project Allocation

533,100

(Base Project Allocation - $479,790)

 

(Design and Contingencies - $53,310)

 

(xxvii)  FFY 2011 additional funding for Formula Program, bring transit and railroad facilities into a state of good repair, provide for the reconstruction or rehabilitation of transit and regional rail stations and terminals, bus/trolley loop facilities and transportation centers, modernization of the signal program on SEPTA's regional rail system, bus purchase program, new payment technologies, systems improvements program, purchase of vehicles for use on SEPTA paratransit services, upgrade and replace SEPTA's utility fleet and automotive service fleet, improve accessibility at railroad and transit stations, rehabilitation of City Hall and 15th Street stations, restoration of rail service from Elwyn, Delaware County, to a new terminus at Wawa, Delaware County, regional rail substation improvements and design, construction, expansion and rehabilitation of parking facilities

 

Project Allocation

6,792,700

(Base Project Allocation - $6,113,430)

 

(Design and Contingencies - $679,270)

 

(xxviii)  FFY 2011 additional funding for Rail Modernization Program, bring transit and railroad facilities into a state of good repair, provide for the reconstruction or rehabilitation of transit and regional rail stations and terminals, bus/trolley loop facilities and transportation centers, modernization of the signal program on SEPTA's regional rail system, station accessibility program, rehabilitation of City Hall and 15th Street stations, restoration of rail service from Elwyn, Delaware County, to a new terminus at Wawa, Delaware County, regional rail substation improvements and design, construction, expansion and rehabilitation of parking facilities

 

Project Allocation

7,416,800

(Base Project Allocation - $6,675,120)

 

(Design and Contingencies - $741,680)

 

(xxix)  FFY 2011 Bus Purchase Program

 

Project Allocation

4,133,100

(Base Project Allocation - $3,719,790)

 

(Design and Contingencies - $413,310)

 

(xxx)  FFY 2010-2011 State of Good Repair Program, rehabilitation of shops, maintenance/storage yards and associated maintenance and support facilities, rehabilitation of electric traction, power, signal and communications systems and associated components, renewal or replacement of track, switches and special work, including yard and shop areas, track surfacing, grade crossing improvements and acquisition of specialized track equipment, rehabilitation of station buildings and associated facilities, site assessments, remediation and testing activities associated with underground storage tanks, lead-based paint and asbestos abatement, contaminated soil and groundwater and air quality

 

Project Allocation

25,000,000

(Base Project Allocation - $22,500,000)

 

(Design and Contingencies - $2,500,000)

 

(xxxi)  FFY 2011-2012 Infrastructure Safety Renewal Program, including improvements to stations, communications and signal systems, track, right-of-way, power, bridges and buildings

 

Project Allocation

66,000,000

(Base Project Allocation - $59,400,000)

 

(Design and Contingencies - $6,600,000)

 

(xxxii)  FFY 2011-2012 State of Good Repair Program, rehabilitation of shops, maintenance/storage yards and associated maintenance and support facilities, rehabilitation of electric traction, power, signal and communications systems and associated components, renewal or replacement of track, switches and special work, including yard and shop areas, track surfacing, grade crossing improvements, acquisition of specialized track equipment, rehabilitation of station buildings and associated facilities, site assessments, remediation and testing activities associated with underground storage tanks, lead-based paint and asbestos abatement, contaminated soil and groundwater, air quality and rehabilitation/replacement of bridges

 

Project Allocation

25,000,000

(Base Project Allocation - $22,500,000)

 

(Design and Contingencies - $2,500,000)

 

(xxxiii)  FFY 2009 additional funding for Rail Modernization Program, bring transit and railroad facilities into a state of good repair, provide for the reconstruction or rehabilitation of transit and regional rail stations and terminals, bus/trolley loop facilities and transportation centers

 

Project Allocation

15,000,000

(Base Project Allocation - $13,500,000)

 

(Design and Contingencies - $1,500,000)

 

(b)  Rural and intercity rail.--Additional capital projects in the category of transportation assistance projects for rural and intercity rail service projects to be constructed or with respect to which an interest is to be acquired by the Department of Transportation, its successors or assigns and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:

 

Project

Total Project Allocation

(1)  Allegheny County

 

(i)  Allegheny Valley Railroad

 

(A)  Rehabilitate and construct necessary Glenwood Yard infrastructure to improve existing capacity and safety issues, including rail, roadbed, bridges, grade crossings and other related materials

 

Project Allocation

3,000,000

(Base Project Allocation - $2,700,000)

 

(Design and Contingencies - $300,000)

 

(B)  Rehabilitate rail infrastructure and construct new sidings to support customer development in Allegheny and Washington Counties

 

Project Allocation

2,500,000

(Base Project Allocation - $2,250,000)

 

(Design and Contingencies - $250,000)

 

(C)  Rehabilitate main line infrastructure, including rails, ties, ballast, undercutting, bridges, crossings and other related materials, in Allegheny and Washington Counties

 

Project Allocation

5,000,000

(Base Project Allocation - $4,500,000)

 

(Design and Contingencies - $500,000)

 

(ii)  Leetsdale Borough

 

(A)  Improvement and rehabilitation of the Hussey Copper Rail Spur Line and structures appurtenant thereto, including track construction, track reconstruction, grade construction and turnout installation

 

Project Allocation

2,000,000

(iii)  Petroleum Products Corporation

 

(A)  Rehabilitate and construct necessary rail infrastructure for blending and storage terminal in Allegheny County, including design, engineering, rails, ties, ballast, crossings, switches and turnouts

 

Project Allocation

17,000,000

(2)  Berks County

 

(i)  Colebrookdale Railroad

 

(A)  Engineering, permitting, property acquisition and construction of rails and loading facilities

 

Project Allocation

1,500,000

(ii)  Muhlenberg Township

 

(A)  Construction, renovation, infrastructure and other costs related to the Tuckerton Road Industrial Park, including rail facilities

 

Project Allocation

1,800,000

(iii)  Petroleum Products Corporation

 

(A)  Rehabilitate and construct necessary rail infrastructure for blending and storage terminal in Berks County, including design, engineering, rails, ties, ballast, crossings, switches and turnouts

 

Project Allocation

10,000,000

(iv)  Sinking Spring Borough

 

(A)  Rehabilitation of railroad infrastructure, including track rebuild, installation of new crossties, repair of grade crossings, switch repair, track resurfacing and rebuild of drainage systems for F.M. Brown's and Sons, Inc.

 

Project Allocation

3,000,000

(3)  Blair County

 

(i)  Everett Railroad

 

(A)  Engineering and design, as well as actual improvements and upgrades to the Bedford Secondary Branch Line from the Borough of Hollidaysburg to the Walter Business Park located in Greenfield Township, including construction, infrastructure and other related costs

 

Project Allocation

2,000,000

(3.1)  Bradford County

 

(i)  Borough of Sayre

 

(A)  Construction of a rail transload facility, including loading and unloading equipment, a rail spur line, mainline turnout, additional sidings and switches, utility relocations, a railroad scale, a truck scale, asphalt lay-down and storage area and frac sand storage buildings

 

Project Allocation

4,000,000

(4)  Bucks County

 

(i)  Gamesa Wind US

 

(A)  Construction and reactivation of approximately 5,000 feet of track in Langhorne

 

Project Allocation

2,000,000

(Base Project Allocation - $1,800,000)

 

(Design and Contingencies - $200,000)

 

(ii)  New Hope and Ivyland Railroad

 

(A)  Rehabilitation of the New Hope and Ivyland Railroad, including infrastructure, installation of railroad ties, surfacing and resurfacing of track, trestle timbers replacement and other related costs

 

Project Allocation

1,828,000

(5)  Centre County

 

(i)  Boggs Township and Milesburg Borough

 

(A)  Construction of the Nittany & Bald Eagle Railroad Baker Runaround Track

 

Project Allocation

1,120,000

(ii)  Liberty and Howard Townships

 

(A)  Replacement of jointed rails and related track improvements for Phase 4 of the Nittany & Bald Eagle Railroad Main Rail Welding Project

 

Project Allocation

3,500,000

(iii)  SEDA-COG Joint Rail Authority - Nittany & Bald Eagle Railroad Bridge Replacement

 

(A)  Span replacement and rehabilitation of bridge, including related track improvements, engineering and permitting for structure over Spring Creek in Bellefonte Borough (Tallyrand Bridge)

 

Project Allocation

2,000,000

(iv)  SEDA-COG Joint Rail Authority - Nittany & Bald Eagle Railroad Track Rehabilitation

 

(A)  Replace rail and make upgrades to track from Milesburg to Pleasant Gap on the Bellefonte Industrial and Pleasant Gap Industrial Tracks and related engineering costs

 

Project Allocation

2,000,000

(6)  Chester County

 

(i)  Tredyffrin and Willistown Townships

 

(A)  Construction of the Paoli Transit Center, including infrastructure and other related costs

 

Project Allocation

20,000,000

(6.1)  Crawford County

 

(i)  Economic Progress Alliance of Crawford County

 

(A)  For costs related to the improvements of the existing rail line that runs adjacent to the Keystone Regional Industrial Park as well as the construction of new track and turnouts to provide rail service to the industrial and manufacturing businesses in the Keystone Regional Industrial Park

 

Project Allocation

1,000,000

(ii)  Greenwood Township

 

(A)  Infrastructure, construction and other related costs for the development of the Keystone Regional Industrial Park rail line, including improvements to the existing rail line and the construction of new track and turnouts

 

Project Allocation

1,000,000

(7)  Cumberland County

 

(i)  Norfolk Southern Corporation

 

(A)  Crescent Corridor Project: extend second main track in Mt. Holly Springs, from MP LG15.6 to MP LG15.0, in Cumberland County

 

Project Allocation

17,500,000

(Base Project Allocation - $16,100,000)

 

(Design and Contingencies - $1,400,000)

 

(8)  Dauphin County

 

(i)  Norfolk Southern Corporation

 

(A)  Crescent Corridor Project: construct second main track in Harrisburg wye, from MP HP111.4 to MP LG0.5, in Dauphin County

 

Project Allocation

7,000,000

(Base Project Allocation - $6,440,000)

 

(Design and Contingencies - $560,000)

 

(B)  Crescent Corridor Project: upgrades and rail reconstruction to the Intermodal Yard in Harrisburg, Dauphin County

 

Project Allocation

20,000,000

(Base Project Allocation - $18,000,000)

 

(Design and Contingencies - $2,000,000)

 

(C)  Construction of a new higher-rated weight category railroad bridge over State Route 2019 (Milroy Road) in Swatara Township to replace a deficient- rated railroad bridge as part of the Crescent Corridor Project

 

Project Allocation

15,000,000

(ii)  Petroleum Products Corporation

 

(A)  Rehabilitate and construct necessary rail infrastructure for blending and storage terminal in Dauphin County, including design, engineering, rails, ties, ballast, crossings, switches and turnouts

 

Project Allocation

15,000,000

(8.1)  Elk County

 

(i)  St. Marys Industrial Railroad Project

 

(A)  For repair of existing trackage and switches, construction of new trackage and switches, acquisition of land, construction of transload facility and acquisition of related transload equipment

 

Project Allocation

5,000,000

(9)  Erie County

 

(i)  Erie Inland Port-Rail Terminal

 

(A)  Acquisition, construction, infrastructure and other related costs for the Erie Inland Port-Rail Terminal and Logistics Park Phase I

 

Project Allocation

30,000,000

(10)  Fayette County

 

(i)  Fay-Penn Industrial Development Corporation

 

(A)  Construct transload facility to support new customer development in Fayette County

 

Project Allocation

2,500,000

(Base Project Allocation - $2,250,000)

 

(Design and Contingencies - $250,000)

 

(11)  Franklin County

 

(i)  Norfolk Southern Corporation

 

(A)  Crescent Corridor Project: extend second main track in Greencastle, from MP HW60 to MP HW68, in Franklin County

 

Project Allocation

15,500,000

(Base Project Allocation - $14,260,000)

 

(Design and Contingencies - $1,240,000)

 

(B)  Crescent Corridor Project: construct new intermodal terminal yard in Greencastle, Franklin County

 

Project Allocation

98,000,000

(Base Project Allocation - $90,160,000)

 

(Design and Contingencies - $7,840,000)

 

(12)  Huntingdon County

 

(i)  East Broad Top Preservation Association

 

(A)  Three-phase project to include the acquisition of the Mount Union East Broad Top trackage and land, improvements to track, addition of storage and repair of trackage, construction of loading station on the existing East Broad Top land, usage of old trackage and ROW in Mount Union to Orbisonia and other related costs

 

Project Allocation

5,000,000

(12.1)  Lackawanna County

 

(i)  Fell Township

 

(A)  Construction, infrastructure and other costs related to the Carbondale Rail Yard Transload Facility

 

Project Allocation

5,456,000

(12.2)  Lancaster County

 

(i)  Strasburg Railroad

 

(A)  Infrastructure, rehabilitation, construction and other related costs for the construction of a transload facility and customer sidings to handle biofuel, aggregate, construction materials and agriculture commodities in Lancaster County

 

Project Allocation

3,000,000

(B)  Rehabilitate and construct infrastructure required for handling increasing freight demand in Lancaster County, including rails, ties, ballast, switches, undercutting, drainage, bridges, crossings, sidings, turning facilities and other related materials and costs

 

Project Allocation

5,000,000

(13)  Lehigh County

 

(i)  Allentown Commercial and Industrial Development Authority

 

(A)  Rehabilitation, construction and other related costs to reintroduce freight rail service to the Barber's Quarry branch of the former Lehigh Valley Railroad

 

Project Allocation

1,500,000

(ii)  Upper Macungie Township

 

(A)  Extension of rail service in Upper Macungie Township from existing line to serve new buildings

 

Project Allocation

1,000,000

(14)  Luzerne County

 

(i)  Jenkins Township

 

(A)  Track rehabilitation and new construction at the former Techneglas facility

 

Project Allocation

700,000

(ii)  Petroleum Products Corporation

 

(A)  Rehabilitate and construct necessary rail infrastructure for blending and storage terminal in Luzerne County, including design, engineering, rails, ties, ballast, crossings, switches and turnouts

 

Project Allocation

10,000,000

(15)  Lycoming County

 

(i)  City of Williamsport

 

(A)  Infrastructure improvements for the Newberry Rail Yard Intermodal Facility in the Reach Road Industrial Park

 

Project Allocation

1,000,000

(ii)  SEDA-COG Joint Rail Authority

 

(A)  Construction and infrastructure costs related to the Keystone Filler Rail Extension and unloading system. The project will include the extension of existing track, the addition of a second switch and the addition of a rail pit and unloading system which will include a public use rail side unloading ramp

 

Project Allocation

2,000,000

(15.1)  McKean County

 

(i)  American Refining Group

 

(A)  Rehabilitate existing rail infrastructure and construct new sidings to facilitate the efficient and safe handling of petroleum and alternative fuel products, including engineering, site preparation, drainage, loading equipment, piping, rail, ties, ballast and other related materials

 

Project Allocation

3,300,000

(Base Project Allocation - $3,000,000)

 

(Design and Contingencies - $300,000)

 

(15.2)  Mercer County

 

(i)  City of Sharon

 

(A)  Track rehabilitation and new construction adjacent to Route 718 in Sharon

 

Project Allocation

700,000

(16)  Montgomery County

 

(i)  Ambler Borough

 

(A)  Acquisition, construction and other related costs to redevelop the Ambler Main Street Rail Corridor

 

Project Allocation

5,000,000

(ii)  Lower Marion Township

 

(A)  Construction and infrastructure costs for the replacement and expansion of existing Norfolk Southern Railroad bridge

 

Project Allocation

5,000,000

(17)  Montour County

 

(i)  Danville Borough

 

(A)  Construction and other related costs for the Irontown Commerce Center Rail Facilities

 

Project Allocation

3,500,000

(18)  Northampton County

 

(i)  Lehigh Valley Economic Development Corporation

 

(A)  Infrastructure, construction and other related costs for the construction of four new rail spur lines next to the Ponderosa Fibers Plant for expansion of operations at the facility

 

Project Allocation

353,000

(ii)  Scots Lubricants

 

(A)  Construction of rail access to manufacturing facility in Northampton Borough

 

Project Allocation

700,000

(Base Project Allocation - $630,000)

 

(Design and Contingencies - $70,000)

 

(19)  Northumberland County

 

(i)  Coal Township

 

(A)  Construction and other related costs for the SEEDCO North Rail Facilities

 

Project Allocation

2,695,000

(B)  Construction and other related costs for the SEEDCO South Rail Facilities

 

Project Allocation

1,078,000

(i.1)  Moran Industries

 

(A)  Rehabilitation and construction of railroad crossing bridge serving F.P. Leopold and Moran Industries, as well as connecting spur lines off Buffalo Line of Norfolk Southern, including construction costs related to development of rail-served intermodal yard

 

Project Allocation

2,000,000

(ii)  Norfolk Southern Corporation

 

(A)  Rehabilitation and rebuilding of railroad crossing bridge serving F.P. Leopold and Moran Industries, connecting spur lines off Buffalo Line of Norfolk Southern and construction costs related to development of rail-served intermodal yard

 

Project Allocation

1,900,000

(iii)  Power and Yard

 

(A)  Construction and infrastructure costs to establish a rail facility to support the shipping of products related to the natural gas industry

 

Project Allocation

5,000,000

(20)  Philadelphia County

 

(i)  Norfolk Southern Corporation

 

(A)  Crescent Corridor Project: construct addition to intermodal terminal at Navy Yard in Philadelphia County

 

Project Allocation

5,000,000

(Base Project Allocation - $4,600,000)

 

(Design and Contingencies - $400,000)

 

(ii)  City of Philadelphia

 

(A)  Construction, infrastructure and other related costs for a waste-to-rail transfer station

 

Project Allocation

6,424,000

(20.1)  Potter County

 

(i)  Western New York and Pennsylvania Railroad Company L.L.C.

 

(A)  Renovations, rehabilitation, construction and other costs related to the repair or replacement of the Austin Road (T-516) bridge over the Western New York and Pennsylvania Railroad

 

Project Allocation

157,000

(20.2)  Tioga County

 

(i)  Wellsboro and Corning Railroad Company

 

(A)  New construction of a second main line for high-volume points on existing railroad right-of-way, land acquisition and infrastructure necessary to support new and existing transloading operations, construction of turnouts and sidings to new and existing industry and rehabilitation of existing rail infrastructure

 

Project Allocation

15,200,000

(21)  Union County

 

(i)  Gregg and White Deer Townships

 

(A)  Renovations, rehabilitation, construction and other costs related to the restoration of rail service to Great Stream Commons, including bridge restoration, washout repairs, public crossings, sidings and other related rehabilitation

 

Project Allocation

2,800,000

(i.1)  Lewisburg and Buffalo Creek Railroad

 

(A)  Replacement of timber ties, walkway and ground tie timbers for bridge number 166.54

 

Project Allocation

100,000

(ii)  West Shore Railroad in Union and Northumberland Counties

 

(A)  Capital improvements to bridges numbered 170.29 and 170.45, including removing and replacing the timber ties on the four east end spans of each bridge structure and replacement of walkway and timber guard. New ground tie timbers to be placed in the approach track at each end of the bridge

 

Project Allocation

430,000

(22)  Westmoreland County

 

(i)  City of Monessen

 

(A)  Rehabilitation and reestablishment of rail spur, including installation of linear track and three switches for Alumisource Rail

 

Project Allocation

475,000

(23)  York County

 

(i)  Church & Dwight/Arm & Hammer

 

(A)  Construction and related rail work of new rail spurs servicing the Davies Facility in Jackson Township

 

Project Allocation

2,300,000

(Base Project Allocation - $2,070,000)

 

(Design and Contingencies - $230,000)

 

(ii)  York Railway Company

 

(A)  Rehabilitation, infrastructure, construction and other related costs for new sidings and yard tracks for the York Railway Company

 

Project Allocation

20,000,000

(B)  Rail infrastructure improvements, construction and other related costs for a manufacturing and distribution facility in Jackson Township

 

Project Allocation

1,500,000

(iii)  Codorus Creek Railway

 

(A)  Rehabilitation of Northern Central and Stewartstown Railroad, including ties, rail and ballast

 

Project Allocation

7,698,000

(24)  Multiple Counties

 

(i)  D & I Silica Transload Facilities

 

(A)  Infrastructure, renovations, rehabilitation, construction and other costs related to the expansion of rail lines and storage facilities for D & I Silica in Armstrong, Bradford, Cameron, Fayette, Luzerne, McKean, Tioga and Warren counties

 

Project Allocation

3,000,000

(ii)  Delaware and Hudson Railway

 

(A)  Establish transload facilities from New York State line to Sunbury in Susquehanna, Wyoming, Lackawanna, Luzerne, Columbia, Montour and Northumberland Counties to accommodate new commodities and developing markets, including land acquisition, site preparation, grading, rail, ties, ballast, signals, customer sidings, crossings and other related materials

 

Project Allocation

15,000,000

(Base Project Allocation - $14,000,000)

 

(Design and Contingencies - $1,000,000)

 

(B)  Reconstruct rail infrastructure from New York State line to Sunbury in Susquehanna, Wyoming, Lackawanna, Luzerne, Columbia, Montour and Northumberland Counties, including grading, drainage, ties, rail, surface, bridges, switches, road crossings, signals, communications and other associated improvements

 

Project Allocation

16,500,000

(Base Project Allocation - $15,000,000)

 

(Design and Contingencies - $1,500,000)

 

(25)  Westmoreland and Fayette Counties

 

(i)  Westmoreland County Industrial Development Corporation

 

(A)  Rehabilitate main line infrastructure, including rails, ties, ballast, undercutting, bridges, crossings and other related materials

 

Project Allocation

3,000,000

(Base Project Allocation - $2,500,000)

 

(Design and Contingencies - $500,000)

 

(B)  Rehabilitate rail infrastructure and construct new sidings to support customer development

 

Project Allocation

2,000,000

(Base Project Allocation - $1,700,000)

 

(Design and Contingencies - $300,000)

 

(ii)  Wheeling and Lake Railroad

 

(A)  Infrastructure, construction and improvements to handle increase in traffic volumes, including switches, signals, rail, ties, ballast, bridges, tunnels and other related materials in Allegheny, Washington, Fayette and Westmoreland Counties

 

Project Allocation

11,000,000

(Base Project Allocation - $10,000,000)

 

(Design and Contingencies - $1,000,000)

 

(B)  Infrastructure, construction and improvements to develop new and existing customers in Allegheny, Washington, Fayette and Westmoreland Counties, including rail, ties, ballast, switches, signals, bridges, tunnels and other related materials

 

Project Allocation

11,000,000

(Base Project Allocation - $10,000,000)

 

(Design and Contingencies - $1,000,000)

 

(c)  Air transportation.--Additional capital projects in the category of transportation assistance projects for air transportation service to which an interest is to be acquired by the Department of Transportation, its successors or assigns and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:

 

Project

Total Project Allocation

(1)  Allegheny County

 

(i)  Allegheny Airport in West Mifflin

 

(A)  Construction of office building and hangar, including related costs

 

Project Allocation

4,000,000

(ii)  Allegheny County Airport Authority

 

(A)  Infrastructure, redevelopment, construction and other related costs, including environmental mitigation, for expansion of the Pittsburgh International Airport Airside Business Park

 

Project Allocation

1,500,000

(B)  Construction, environmental improvements and other costs related to Phase IV of a project at the Pittsburgh International Airport for construction of a Deicing Stormwater Treatment Plant

 

Project Allocation

12,000,000

(C)  Infrastructure, redevelopment, construction, environmental mitigation and other costs related to Phase I of an economic development project at the Pittsburgh International Airport for development of the Westfield site, adjacent to the Clinton Road/U.S. Route 30 Interchange of I-376

 

Project Allocation

32,000,000

(2)  Chester County

 

(i)  New Garden Flying Field

 

(A)  Construction of public use terminal building, including related costs

 

Project Allocation

2,235,000

(B)  Construction of base hangar, including related costs

 

Project Allocation

2,278,000

(2.1)  Columbia County

 

(i)  Bloomsburg Municipal Airport

 

(A)  Infrastructure, rehabilitation, construction and other costs related to renovations and restoration of main buildings on the airport grounds

 

Project Allocation

1,500,000

(3)  Dauphin County

 

(i)  Harrisburg International Airport

 

(A)  Construction, infrastructure and associated costs for the demolition and redevelopment of the former Harrisburg International Airport terminal building

 

Project Allocation

3,000,000

(3.1)  Erie County

 

(i)  Erie International Airport, Tom Ridge Field

 

(A)  Acquisition, installation and other related costs for equipment necessary for maintaining and operating the Erie International Airport

 

Project Allocation

1,000,000

(3.2)  Fayette County

 

(i)  Fayette County Airport Authority

 

(A)  Expansion and renovation of the Joseph A. Hardy Connellsville Airport for expansion and renovation of airport facilities

 

Project Allocation

2,000,000

(4)  Lehigh County

 

(i)  Lehigh-Northampton Airport Authority

 

(A)  Construction of hangar for Queen City Airport, including related costs

 

Project Allocation

1,100,000

(B)  Construction of bulk aircraft storage hangar at Queen City Airport, including related costs

 

Project Allocation

2,000,000

(C)  Construction of hangar at Lehigh Valley International Airport, including related costs

 

Project Allocation

3,400,000

(5)  Philadelphia County

 

(i)  Philadelphia International Airport

 

(A)  Construction, renovation, infrastructure and other related costs for the Liberty USO section of Terminal A

 

Project Allocation

1,000,000

(6)  Snyder County

 

(i)  Penn Valley Airport

 

(A)  Construction, acquisition and other related costs for a new, modern, energy-efficient hangar, renovation of existing hangars, construction of new waste oil heating system and construction of additional T-hangars

 

Project Allocation

1,500,000

(7)  Washington County

 

(i)  Redevelopment Authority of Washington County

 

(A)  Construction of hangars at Washington Airport Northside

 

Project Allocation

3,000,000

20100082u6s

Section 6.  Itemization of redevelopment assistance projects.

Additional capital projects in the category of redevelopment assistance projects for capital grants by the Department of Community and Economic Development, its successors or assigns, authorized under the provisions of the act of May 20, 1949 (P.L.1633, No.493), known as the Housing and Redevelopment Assistance Law, and redevelopment assistance capital projects and to be financed by the incurring of debt are hereby itemized, together with their estimated financial costs, as follows:

Project

Total Project Allocation

(1)  Adams County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(B)  Acquisition, construction, infrastructure and renovation and rehabilitation costs for the Adams County Emergency Communications project

 

Project Allocation

10,000,000

(ii)  Gettysburg Borough

 

(A)  Acquisition and renovation of a vacant building to serve as a community arts education center

 

Project Allocation

1,150,000

(iii)  Hamiltonban Township

 

(A)  Acquisition, infrastructure and construction of a township educational campus

 

Project Allocation

2,300,000

(2)  Allegheny County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an industrial facility in the vicinity of the Pittsburgh International Airport

 

Project Allocation

30,000,000

(B)  Acquisition, remediation construction and other related costs for a film/television studio project

 

Project Allocation

10,000,000

(C)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

10,000,000

(D)  Construction, infrastructure and other related costs for the Jewish Family and Children's Service facilities

 

Project Allocation

300,000

(E)  Acquisition, infrastructure improvements, construction and other costs related to the Biotechnology Commercialization Expansion project

 

Project Allocation

25,000,000

(F)  Construction, renovations, infrastructure and other related costs for Chatham University Eden Hall campus

 

Project Allocation

20,000,000

(G)  Construction, renovations, infrastructure and other related costs for Chatham University School of Animal Science

 

Project Allocation

15,000,000

(H)  Acquisition, renovation, rehabilitation and construction of the UCP/Class Center II project

 

Project Allocation

1,500,000

(I)  Construction, renovations, infrastructure and other related costs for Boyce Park, White Oak Park and Round Hill Park

 

Project Allocation

2,000,000

(J)  Construction, renovations, infrastructure and other related costs for West Hall on the Allegheny campus of the Community College of Allegheny County

 

Project Allocation

4,500,000

(K)  Construction, acquisition, infrastructure and other related costs for extension of the Light Rail Transit system

 

Project Allocation

5,000,000

(L)  Construction, acquisition, infrastructure, redevelopment and other related costs for improvements to the Route 51 Corridor

 

Project Allocation

2,500,000

(M)  Construction, acquisition, infrastructure and other related costs for a Maglev high-speed rail project

 

Project Allocation

5,000,000

(N)  Construction, infrastructure and other related costs for building improvements at Keystone Oaks School District schools

 

Project Allocation

3,000,000

(O)  Construction, infrastructure and other related costs for a redevelopment project in the Castle Shannon business district

 

Project Allocation

1,500,000

(P)  Acquisition, renovation, infrastructure, construction and other costs related to a Regional Public Safety Building for various communities in the eastern suburbs of Pittsburgh

 

Project Allocation

4,000,000

(Q)  Acquisition, renovation infrastructure, construction and other costs related to the Regent Square business development project, including theater renovations

 

Project Allocation

4,000,000

(R)  Construction, renovation, infrastructure and other costs related to the Community College of Allegheny County West Hall

 

Project Allocation

3,000,000

(S)  Construction, renovation, infrastructure and other costs related to the David L. Lawrence Convention Center Hotel

 

Project Allocation

20,000,000

(T)  Construction, redevelopment, infrastructure and other costs related to the Penn Hills redevelopment project for a multipurpose/family life center for MACRI

 

Project Allocation

5,000,000

(U)  Construction, redevelopment, infrastructure and other costs related to the Woodlands Foundation facility

 

Project Allocation

600,000

(V)  Construction, redevelopment, infrastructure and other costs related to the North Hills Highland senior day-care facility

 

Project Allocation

1,000,000

(W)  Construction, redevelopment, infrastructure and other costs related to the Newbury development project

 

Project Allocation

5,000,000

(X)  Construction, redevelopment, infrastructure and other costs related to the Shannon Transit Village project

 

Project Allocation

2,000,000

(Y)  Construction, redevelopment, infrastructure and other costs related to the Wood Street Commons project

 

Project Allocation

3,000,000

(Z)  Construction, redevelopment, infrastructure and other costs related to the Wilkinsburg train station building

 

Project Allocation

1,000,000

(AA)  Construction, redevelopment, infrastructure and other costs related to the Monroeville industrial development district revitalization

 

Project Allocation

3,000,000

(BB)  Construction, redevelopment, infrastructure and other costs related to the McKees Rocks industrial center

 

Project Allocation

3,000,000

(CC)  Construction, redevelopment, infrastructure and other costs related to the Half Brothers Building

 

Project Allocation

1,000,000

(DD)  Construction, redevelopment, infrastructure and other costs related to the Edgewater Steel site redevelopment

 

Project Allocation

7,000,000

(EE)  Construction, redevelopment, infrastructure and other costs related to the Carrie Furnace redevelopment project

 

Project Allocation

12,000,000

(FF)  Construction, infrastructure and other costs related to the Doughboy Square redevelopment project in Lawrenceville

 

Project Allocation

10,000,000

(GG)  Construction, redevelopment, infrastructure and other costs related to the Mazeroski Field improvement project

 

Project Allocation

1,500,000

(HH)  Construction, infrastructure and other costs related to redevelopment in West Mifflin Borough

 

Project Allocation

5,000,000

(II)  Construction, infrastructure and other costs related to redevelopment of the former Westinghouse facility

 

Project Allocation

5,000,000

(JJ)  Construction, infrastructure and other costs related to redevelopment in Penn Hills Township

 

Project Allocation

5,000,000

(KK)  Construction, infrastructure and other costs related to redevelopment in Wilkins Township

 

Project Allocation

5,000,000

(LL)  Construction, infrastructure and other costs related to redevelopment in Steel Valley communities, including business development

 

Project Allocation

10,000,000

(MM)  Infrastructure improvements, including construction, renovations and rehabilitation of Settlers Park

 

Project Allocation

1,000,000

(NN)  Acquisition, redevelopment, rehabilitation and renovations of property and buildings and equipment costs for a school for children with complex learning disabilities

 

Project Allocation

1,000,000

(OO)  Rehabilitation, renovations and restoration of the Bidwell Training Center and Manchester Craftsmen's Guild campus

 

Project Allocation

500,000

(PP)  Infrastructure improvements, including construction, renovations and rehabilitation of South Park

 

Project Allocation

3,500,000

(QQ)  Allegheny County Airport Authority  infrastructure, redevelopment, construction and other related costs, including environmental mitigation, for expansion of the Pittsburgh International Airport Airside Business Park

 

Project Allocation

1,500,000

(RR)  Allegheny County Airport Authority  infrastructure, redevelopment, construction, environmental mitigation and other costs related to Phase I of an economic development project at the Pittsburgh International Airport, for development of the Westfield site, adjacent to the Clinton Road/US 30 Interchange of I-376

 

Project Allocation

32,000,000

(SS)  Construction, infrastructure and other related costs for a North Hills campus facility, Community College of Allegheny County

 

Project Allocation

26,000,000

(i.1)  Allegheny Redevelopment Authority

 

(A)  Infrastructure, construction and other costs related to new facilities for the Robert Morris University's School of Communications and Information Systems to be located on the main campus in Moon Township

 

Project Allocation

4,000,000

(i.2)  Redevelopment Authority of Allegheny County

 

(A)  Infrastructure, renovations, rehabilitation and construction of multipurpose field known as Herb Troy Memorial Field

 

Project Allocation

750,000

(B)  Rehabilitation, renovation and construction of capital facilities, including infrastructure, within the La Roche College campus

 

Project Allocation

5,000,000

(C) Renovations and rehabilitation for the development of the Quaker Valley Technology and Arts Center

 

Project Allocation

500,000

(D)  Renovations and rehabilitation of the Sewickley Valley YMCA

 

Project Allocation

1,000,000

(E)  Renovations, rehabilitation and construction costs for the expansion of operating rooms within the St. Clair Memorial Hospital

 

Project Allocation

2,750,000

(F)  Infrastructure, construction and other related costs for the development of a nursing simulation center at Robert Morris University

 

Project Allocation

5,000,000

(G)  Infrastructure, construction and other related costs for the development of a new business school complex at Robert Morris University

 

Project Allocation

5,000,000

(H)  Infrastructure, rehabilitation and redevelopment of the former Koppers Chemical Plant, including the abatement of hazardous materials and other related costs

 

Project Allocation

5,000,000

(I)  Construction, renovations and infrastructure improvements to the Pittsburgh Technical Institute campus

 

Project Allocation

20,000,000

(J)  Site development, utilities extension, infrastructure, construction and other related costs for an economic development project within an industrial/business park, including the construction of a connector road to McClaren Road near the interchange of Interstate 376, to facilitate the development of commercial and industrial space

 

Project Allocation

5,500,000

(K)  Infrastructure, site grading, utilities extension, construction and other costs related to the Clinton Commerce Park - Phase IIB project

 

Project Allocation

10,000,000

(L)  Renovations, rehabilitation, construction and other related costs for the expansion of an ultraviolet light facility located on McLaren Run Road

 

Project Allocation

2,000,000

(i.3)  Urban Redevelopment Authority of Pittsburgh

 

(A)  Site development, including on-site infrastructure and new construction of facilities to accommodate mixed-use development in and around Cassabill Estates

 

Project Allocation

5,000,000

(B)  Infrastructure, renovations, rehabilitation, construction and other related costs, including the abatement of hazardous materials for the ASSET Professional Development Centers for Advancing STEM Education

 

Project Allocation

5,000,000

(i.4)  City of Duquesne

 

(A)  Construction, redevelopment, infrastructure and other costs related to the American Textile Company building

 

Project Allocation

3,500,000

(i.5)  City of McKeesport

 

(A)  Demolition, construction, renovations, infrastructure and other related costs for the McKeesport Commons Phase II project at the RIDC Industrial Center

 

Project Allocation

12,000,000

(B)  Construction, renovation, infrastructure and other costs related to the McKeesport Commons Phase II project

 

Project Allocation

12,000,000

(ii)  City of Pittsburgh

 

(A)  Acquisition, construction, infrastructure and other related costs for Education Management Corporation expansion

 

Project Allocation

5,000,000

(B)  Rebuild public park adjacent to the Children's Museum of Pittsburgh, including construction, infrastructure and other related costs

 

Project Allocation

3,000,000

(C)  Construction, infrastructure, redevelopment and other related costs to the Children's Museum of Pittsburgh Square Park project

 

Project Allocation

3,000,000

(D)  Construction, infrastructure, redevelopment and other related costs for the Hill House Community Facilities renovation project

 

Project Allocation

2,000,000

(E)  Construction, redevelopment and other related costs for a mixed-use development project at the former Nabisco Factory

 

Project Allocation

5,000,000

(F)  Construction, infrastructure, redevelopment and other related costs for the renovation of the Baum Boulevard building

 

Project Allocation

25,000,000

(G)  Construction, infrastructure, redevelopment and other related costs for the Flag Plaza renovation and expansion project

 

Project Allocation

2,000,000

(H)  Construction, infrastructure, redevelopment and other related costs to build the new DCK Worldwide headquarters

 

Project Allocation

10,750,000

(I)  Construction, infrastructure, redevelopment and other related costs for the Greenprint Plan for Hill District and restoration of local urban parks in Pittsburgh

 

Project Allocation

500,000

(J)  Construction and other related costs for the boutique hotel project

 

Project Allocation

4,000,000

(K)  Construction, infrastructure and other related costs for the School of Animal Sciences at Chatham University

 

Project Allocation

15,000,000

(L)  Construction, infrastructure and other related costs for the University of Pittsburgh Medical Center Cancer Centers expansion and upgrades

 

Project Allocation

18,000,000

(M)  Construction, infrastructure, redevelopment and other related costs for the Jewish Community Center of Greater Pittsburgh

 

Project Allocation

250,000

(N)  Construction, infrastructure, redevelopment and other related costs for the Panther Hollow Lake restoration and boathouse project

 

Project Allocation

6,100,000

(O)  Construction, infrastructure, redevelopment and other related costs for the Woodland campus renovations at Chatham University

 

Project Allocation

8,000,000

(P)  Construction, infrastructure and other related costs for expansion and upgrades at the Magee-Women's Hospital of UPMC

 

Project Allocation

16,000,000

(Q)  Construction, infrastructure, redevelopment and other related costs for an assisted living facility

 

Project Allocation

1,000,000

(R)  Construction, infrastructure and other related costs for UPMC Presbyterian - Shadyside campus renovations and upgrades

 

Project Allocation

20,000,000

(S)  Construction, infrastructure, redevelopment and other related costs for an Environmental Center at Frick Park

 

Project Allocation

7,186,000

(T)  Acquisition, construction, infrastructure, redevelopment and other related costs for Homewood Brushton area improvements

 

Project Allocation

6,000,000

(U)  Acquisition, construction, redevelopment and other related costs for the West Penn Allegheny Health System Education and Research Center

 

Project Allocation

20,000,000

(V)  Construction, infrastructure, redevelopment and other related costs for the Chatham Eastside renovations at Chatham University

 

Project Allocation

10,000,000

(W)  Construction, infrastructure and other related costs for a community center in the 31st Ward

 

Project Allocation

1,250,000

(X)  Construction, infrastructure and other related costs to revitalize Allegheny Square Park

 

Project Allocation

1,000,000

(Y)  Construction, infrastructure, redevelopment and other related costs for the Eden Hall campus at Chatham University

 

Project Allocation

20,000,000

(Z)  Construction, renovations, infrastructure and other related costs for WQED facility

 

Project Allocation

750,000

(AA)  Renovation, rehabilitation, construction and other related costs for the Teamsters Temple Building

 

Project Allocation

2,000,000

(BB)  Construction, renovation, infrastructure and other related costs for the Mellon Center, Quadrangle and Student Center facilities

 

Project Allocation

8,000,000

(CC)  Demolition and preparation for redevelopment of former Pittsburgh Public School Beltzhoover Elementary School building

 

Project Allocation

1,532,000

(DD)  Demolition and preparation for redevelopment of former Pittsburgh Public Columbus Middle School

 

Project Allocation

4,385,000

(EE)  Demolition and preparation for redevelopment of former Pittsburgh Public Gladstone Middle School

 

Project Allocation

4,252,000

(FF)  Demolition and preparation for redevelopment of former Pittsburgh Public Madison Elementary School

 

Project Allocation

850,000

(GG)  Demolition and preparation for redevelopment of former Pittsburgh Public Mann Elementary School

 

Project Allocation

1,500,000

(HH)  Demolition and preparation for redevelopment of former Pittsburgh Public Morningside Elementary School

 

Project Allocation

1,200,000

(II)  Demolition and preparation for redevelopment of former Pittsburgh Public Schenley High School

 

Project Allocation

12,560,000

(JJ)  Construction, infrastructure, redevelopment and other related costs for UPMC Monroeville project

 

Project Allocation

20,000,000

(KK)  Acquisition, construction, infrastructure, redevelopment and other related costs for Hazlett Theater

 

Project Allocation

6,000,000

(LL)  Expansion and construction of a residential, retail and entertainment venue at the intersection of Butler and 41st Streets

 

Project Allocation

3,000,000

(MM)  Construction, infrastructure, redevelopment and other related costs for the Schenley Place project on Bayard Street

 

Project Allocation

5,000,000

(NN)  Construction, renovation and other related costs for the Residence Wood Street project

 

Project Allocation

4,000,000

(OO)  Construction, infrastructure and other related costs for a mixed-income, mixed-use development in the Hill District

 

Project Allocation

4,000,000

(PP)  Site development and construction of a school building and field house for school and community use

 

Project Allocation

5,000,000

(QQ)  Renovations and improvements to Hosanna House and the Sherwood property

 

Project Allocation

1,000,000

(RR)  Construction and renovation of the former East Hills Elementary School

 

Project Allocation

1,500,000

(SS)  Construction, infrastructure, redevelopment and other related costs for a Workforce Development Center in Lawrenceville

 

Project Allocation

4,000,000

(TT)  Construction, infrastructure, redevelopment and other related costs for a mixed-use development on Bryant Street in Highland Park

 

Project Allocation

1,000,000

(UU)  Construction, infrastructure, redevelopment and other related costs for the Morningside School project

 

Project Allocation

800,000

(VV)  Construction, infrastructure, redevelopment and other related costs for the renovation of the produce terminal building

 

Project Allocation

10,000,000

(WW)  Construction, infrastructure, redevelopment and other related costs for a mixed-use development in the city

 

Project Allocation

20,000,000

(XX)  Construction, infrastructure, redevelopment and other related costs for restoration of Mellon Square

 

Project Allocation

4,400,000

(YY)  Construction, infrastructure, redevelopment and other related costs for the Storehouse for Teachers project

 

Project Allocation

2,500,000

(ZZ)  Acquisition, construction, infrastructure, redevelopment and other related costs for the Community Empowerment Center

 

Project Allocation

500,000

(AAA)  Construction, infrastructure and other related costs for the development and renovation of the Hill House

 

Project Allocation

2,000,000

(BBB)  Construction, infrastructure and other related costs for the development and renovation of the Lower Hill

 

Project Allocation

30,000,000

(CCC)  Site development, construction and infrastructure improvements at One Grandview Avenue on Mount Washington

 

Project Allocation

15,000,000

(DDD)  Construction, infrastructure and other related costs for Environmental Home Learning Lab

 

Project Allocation

500,000

(EEE)  Construction, infrastructure and other related costs for converting the Shanahan Building into mixed-income housing

 

Project Allocation

1,500,000

(FFF)  Construction, renovation, site development and other improvements for the Duquesne University campus

 

Project Allocation

10,000,000

(GGG)  Construction, renovation and other improvements to the Mattress Factory

 

Project Allocation

1,500,000

(HHH)  Infrastructure, construction and other related costs for the establishment and build-out of a life sciences campus at the River Park Commons Business Center to attract and accommodate burgeoning life sciences companies

 

Project Allocation

500,000

(III)  Acquisition, construction, site development and other improvements for the Ohio River Headwaters West End pedestrian bridge and marina

 

Project Allocation

40,000,000

(JJJ)  Construction, renovation, infrastructure and other related costs for a sports performance training center and community ice rink

 

Project Allocation

15,000,000

(KKK)  Construction, renovation, infrastructure and other related costs for the Carnegie Museums, including the Natural History Museum, Carnegie Music Hall and the Carnegie Science Center

 

Project Allocation

510,000

(LLL)  Acquisition, construction, site development and other improvements for the West Penn Allegheny Health System Education and Research Center

 

Project Allocation

20,000,000

(MMM)  Construction, renovation, infrastructure and other related costs for the Carnegie Science Center Riverview Café

 

Project Allocation

550,000

(NNN)  Construction, renovation, infrastructure and other related costs for the international marketplace, entrepreneurial development center and Zero One Eco Housing facility

 

Project Allocation

10,000,000

(OOO)  Site development and construction of the Neighborhood Academy School building and field house

 

Project Allocation

10,550,000

(PPP)  Construction, infrastructure, redevelopment and other related costs for an orientation center and the Frick Art and Historical Center

 

Project Allocation

4,000,000

(QQQ)  Construction, acquisition, infrastructure and other related costs for a redevelopment project in the Brookline business district

 

Project Allocation

2,000,000

(RRR)  Construction, infrastructure, redevelopment and other related costs for the Carnegie Library of Pittsburgh branch renovations project

 

Project Allocation

5,000,000

(SSS)  Construction, acquisition, infrastructure and other related costs for a redevelopment project in the Grandview Avenue corridor

 

Project Allocation

1,500,000

(TTT)  Construction, acquisition, infrastructure, redevelopment and other related costs for urban greenway and trail development

 

Project Allocation

1,000,000

(UUU)  Construction, acquisition, infrastructure and other related costs for a redevelopment project in the Sheraden business district

 

Project Allocation

1,500,000

(VVV)  Construction, infrastructure and other related costs for a redevelopment project in the Shiloh Street business district

 

Project Allocation

1,000,000

(WWW)  Construction, acquisition, redevelopment and other related costs for the Western PA Women's Hall of Achievement

 

Project Allocation

1,000,000

(XXX)  Construction, infrastructure, redevelopment and other related costs for the South Hills Retirement Residence access project

 

Project Allocation

500,000

(YYY)  Construction, infrastructure and other related costs to improve transportation access in the downtown to Oakland corridor

 

Project Allocation

5,000,000

(ZZZ)  Construction, acquisition, infrastructure, redevelopment and other related costs for structures to improve access for bicycles and pedestrians

 

Project Allocation

2,500,000

(AAAA)  Construction, acquisition, infrastructure and other related costs for the redevelopment of the former Prospect and Beltzhoover School buildings

 

Project Allocation

10,000,000

(BBBB)  Construction, acquisition, infrastructure, redevelopment and other related costs for improvements to the Smart corridor

 

Project Allocation

5,000,000

(CCCC)  Construction, infrastructure, redevelopment and other related costs for the Riverlife Mon Wharf switchback pedestrian bridge

 

Project Allocation

2,500,000

(DDDD)  Construction, infrastructure, redevelopment and other related costs for building renovations on the former Parental Stress Center building on Commerce Street in East Liberty

 

Project Allocation

2,000,000

(EEEE)  Construction, renovation, infrastructure and other costs related to Phase II redevelopment of the former Connelly Trade School into a green innovation campus

 

Project Allocation

10,000,000

(FFFF)  Acquisition, renovation, infrastructure, construction and other costs related to the redevelopment of the former Liberty Park site and Larimer Avenue revitalization

 

Project Allocation

1,750,000

(GGGG)  Construction, renovation, infrastructure and other costs related to the Innovation Oakland Infrastructure Phase IV project

 

Project Allocation

750,000

(HHHH)  Acquisition, renovation, infrastructure, construction and other costs related to the Highland and Wallace buildings historic redevelopment project

 

Project Allocation

1,500,000

(IIII)  Construction, renovation, infrastructure and other costs related to the Historic Goodwill Headquarters building residential redevelopment project

 

Project Allocation

6,000,000

(JJJJ)  Construction, renovation, infrastructure and other costs related to improvements at Carnegie Library of Pittsburgh branches

 

Project Allocation

12,500,000

(KKKK)  Construction, renovation, infrastructure and other costs related to Pittsburgh Community Services, Inc.

 

Project Allocation

1,000,000

(LLLL)  Construction, renovation, infrastructure and other costs related to Energy and Environmental Community Outreach Center

 

Project Allocation

1,500,000

(MMMM)  Construction, redevelopment, infrastructure and other costs related to restoration of urban parks within Southern Pittsburgh, including, but not limited to, Phillips Park and South Side Park

 

Project Allocation

500,000

(NNNN)  Construction, redevelopment, infrastructure and other costs related to restoration of urban parks within southwest neighborhoods of Pittsburgh, including, but not limited to, Sheraden Park and West End Park

 

Project Allocation

500,000

(OOOO)  Construction, redevelopment, infrastructure and other costs related to restoration of urban parks within Eastern Pittsburgh, including, but not limited to, Arsenal Park and Westinghouse Park

 

Project Allocation

500,000

(PPPP)  Construction, site development, infrastructure and other costs related to the Almono LP mixed-use development project

 

Project Allocation

8,000,000

(QQQQ)  Construction, site development, infrastructure and other costs related to the Upper Civic Arena Lower Hill District project for mixed-use development

 

Project Allocation

10,000,000

(RRRR)  Construction, redevelopment, infrastructure and other costs related to the Pittsburgh Symphony Orchestra Heinz Hall renovation

 

Project Allocation

5,000,000

(SSSS)  Construction, redevelopment, infrastructure and other costs related to the AMBER Project at One Waterfront Place

 

Project Allocation

5,000,000

(TTTT)  Acquisition, construction, redevelopment, infrastructure and other costs related to the South Side Housing Development project

 

Project Allocation

3,000,000

(UUUU)  Construction, redevelopment, infrastructure and other costs related to the Squirrel Hill Gateway redevelopment project, including housing

 

Project Allocation

5,000,000

(VVVV)  Construction, land acquisition and renovations related to the expansion of the Steamfitters Local No. 449 training facility

 

Project Allocation

2,000,000

(WWWW)  Renovation and rehabilitation of the former Prospect School in the Mount Washington neighborhood for residential and commercial use, including community space

 

Project Allocation

5,000,000

(XXXX)  Acquisition of land and construction of a multifaceted biomedical research facility for UPMC Cancer research facility at Shadyside

 

Project Allocation

20,000,000

(YYYY)  Construction, infrastructure, renovations and other costs related to a hotel, parking and retail facility for the East Allegheny project

 

Project Allocation

6,000,000

(ZZZZ)  Construction, redevelopment and other related costs for The Pittsburgh Project gymnasium building project

 

Project Allocation

250,000

(ii.1)  Brentwood Borough

 

(A)  Construction, renovation, rehabilitation, infrastructure and other costs related to the multipurpose field known as the Herb Troy Memorial Field

 

Project Allocation

750,000

(B)  Construction, renovation, infrastructure and other costs related to Brentwood Borough Park

 

Project Allocation

4,000,000

(ii.2)  Castle Shannon Borough

 

(A)  Construction, redevelopment, infrastructure and other costs related to business district revitalization

 

Project Allocation

1,500,000

(iii)  Findlay Township

 

(A)  Acquisition, construction, infrastructure and other related costs for Education Management Corporation expansion

 

Project Allocation

5,000,000

(iii.1)  Forest Hills Borough

 

(A)  Construction, renovation, infrastructure and other costs related to the library building

 

Project Allocation

10,000,000

(B)  Acquisition, renovation, infrastructure, construction and other costs related to redevelopment along Ardmore Boulevard

 

Project Allocation

10,000,000

(C)  Acquisition, renovation, infrastructure, construction and other costs related to a parking garage and other buildings

 

Project Allocation

10,000,000

(iv)  Indiana Township

 

(A)  Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for the Indiana Township Town Hall and Community Center

 

Project Allocation

1,000,000

(v)  Marshall Township

 

(A)  Acquisition, construction, infrastructure and other related costs for Education Management Corporation expansion

 

Project Allocation

5,000,000

(vi)  McKeesport Township

 

(A)  Construction, infrastructure and other related costs for UPMC McKeesport campus facilities renovation and upgrades

 

Project Allocation

2,000,000

(vii)  Monroeville Township

 

(A)  Construction, infrastructure, redevelopment and other related costs for Pittsburgh Supercomputing Center upgrades

 

Project Allocation

4,000,000

(B)  Acquisition, construction, renovation, site development and other improvements for Community College of Allegheny County Boyce campus

 

Project Allocation

1,700,000

(C)  Acquisition, infrastructure improvements, construction and other related costs for the Children's Hospital East project

 

Project Allocation

5,000,000

(D)  Construction, renovation, infrastructure and other related costs for UPMC East

 

Project Allocation

20,000,000

(viii)  Moon Township

 

(A)  Construction of new business school complex at Robert Morris University, including necessary costs

 

Project Allocation

5,000,000

(B)  Construction of a Regional Research and Innovations in Simulation Education (RISE) Center at Robert Morris University, including necessary costs

 

Project Allocation

5,000,000

(viii.1)  Munhall Borough

 

(A)  Construction, renovation, infrastructure and other related costs for the Junior Achievement Learning Center

 

Project Allocation

2,000,000

(viii.2)  Neville Township

 

(A)  Construction, renovation, infrastructure and other related costs for the Neville Island flex building redevelopment

 

Project Allocation

1,000,000

(viii.3)  North Versailles Township

 

(A)  Construction, infrastructure, redevelopment and other costs related to the Naser Road relocation and extension project

 

Project Allocation

3,500,000

(viii.4)  Plum Borough

 

(A)  Acquisition, construction, renovation, infrastructure and other related costs for the Eastern Suburban YMCA

 

Project Allocation

4,500,000

(B)  Acquisition, construction, renovation, infrastructure and other related costs for a municipal center

 

Project Allocation

4,000,000

(ix)  Robinson Township

 

(A)  Acquisition, construction, infrastructure and other related costs for Education Management Corporation expansion

 

Project Allocation

5,000,000

(ix.1)  Salem Township

 

(A)  Construction, infrastructure and other costs related to the Western PA Operating Engineers Joint Apprenticeship and Training LEED Gold Training building

 

Project Allocation

6,500,000

(x)  South Fayette Township

 

(A)  Acquisition, construction and other related costs for the South Fayette Civic Center

 

Project Allocation

3,000,000

(x.1)  Springdale Township

 

(A)  Construction, rehabilitation and other costs related to the Rachel Carson Homestead

 

Project Allocation

1,500,000

(xi)  Verona Township

 

(A)  Acquisition, construction and other related costs for the Steel City Rowing boathouse project

 

Project Allocation

500,000

(xi.1)  West Mifflin Borough

 

(A)  Construction, infrastructure and other costs related to the Allegheny County Airport office building and hangar project

 

Project Allocation

2,000,000

(xi.2)  Wilkinsburg Borough

 

(A)  Construction, renovation, infrastructure and other costs related to the Wilkinsburg Train Station

 

Project Allocation

1,550,000

(3)  Armstrong County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(B)  Acquisition, construction and other related costs for upgrades to the county public safety radio system to maintain functionability

 

Project Allocation

2,000,000

(C)  Renovations and other related costs for the rehabilitation of the Belmont Complex, including expansion of the facilities and the addition of a comprehensive wellness center

 

Project Allocation

2,000,000

(D)  Infrastructure, rehabilitation, construction and other hazardous materials for the expansion of the Armstrong County Memorial Hospital's Emergency Department

 

Project Allocation

2,000,000

(ii)  Armstrong County Industrial Development Authority

 

(A)  Site preparation, infrastructure and construction, including infrastructure and utility extensions, to create pad-ready construction sites within West Hills Industrial Park

 

Project Allocation

2,000,000

(B)  Site preparation, infrastructure and construction, including infrastructure and utility extensions, to create pad-ready construction sites within Northpointe

 

Project Allocation

2,000,000

(ii.1)  Freeport Borough

 

(A)  Redevelopment of the downtown area, including environmental remediation, construction and related infrastructure

 

Project Allocation

1,000,000

(4)  Beaver County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(B)  Demolition, in whole or in part, of the former Aliquippa Community Hospital; property improvements, including the construction of required infrastructure; and building construction associated with a mixed-use development in the City of Aliquippa and Hopewell Township

 

Project Allocation

10,000,000

(C)  Property improvements, including the construction of infrastructure and buildings and construction associated with a mixed-use development in Center Township and Potter Township

 

Project Allocation

12,500,000

(D)  Property improvements, including the construction of required infrastructure; construction of buildings and related support facilities associated with the industrial and mixed-use development/redevelopment of a former industrial site located on the left bank of the Ohio River in the City of Aliquippa, the Borough of Monaca, Hopewell Township and Center Township

 

Project Allocation

25,000,000

(E)  Acquisitions, construction, renovation, rehabilitation, infrastructure and other related costs for the construction of a high-tech LED lighting manufacturing facility

 

Project Allocation

5,000,000

(i.1)  Redevelopment Authority of Beaver County

 

(A)  Infrastructure, construction and other related costs for the Big Beaver Borough mixed-use development project, including building improvements, warehousing, storage and transport, light industrial and commercial recreation space

 

Project Allocation

7,500,000

(B)  Infrastructure, redevelopment, construction and other related costs for the Midland Borough mixed-use development project, including building and property improvements and industrial, commercial and institutional spaces

 

Project Allocation

12,500,000

(ii)  City of Aliquippa

 

(A)  Construction, infrastructure, redevelopment and other related costs for the Aliquippa/Hopewell mixed-use development project

 

Project Allocation

10,000,000

(B)  Construction, infrastructure and other related costs for the redevelopment of the former LTV Aliquippa Works

 

Project Allocation

3,000,000

(C)  Phases II and III of the redevelopment of the Alquippa Industrial Park, including infrastructure, abatement of hazardous materials, renovations, rehabilitations, construction and other related costs

 

Project Allocation

3,000,000

(iii)  Center Township

 

(A)  Construction, infrastructure and other related costs for the Center and Potter Townships mixed-use development project

 

Project Allocation

12,500,000

(B)  Construction of an air traffic control tower simulation laboratory at the Community College of Beaver County, including related costs

 

Project Allocatio

1,000,000

(iii.1)  Chippewa Township

 

(A)  Construction and other related costs for Phase III of the StartingGate Proving Grounds business incubator project

 

Project Allocation

1,100,000

(iv)  Daugherty Township

 

(A)  Capital improvements to the facilities of McGuire Memorial, including construction and other related costs

 

Project Allocation

6,000,000

(v)  Hopewell Township

 

(A)  Construction of a dock facility on the left bank of the Ohio River in Hopewell Township, including customary and necessary supportive infrastructure

 

Project Allocation

2,500,000

(vi)  Midland Borough

 

(A)  Acquisition, construction, infrastructure, redevelopment and other related costs for the Midland parking garage

 

Project Allocation

2,500,000

(B)  Construction, infrastructure and other related costs for the building of the Lincoln Park Performing Arts Center

 

Project Allocation

2,500,000

(C)  Construction, infrastructure and other related costs for a multipurpose arts and educational facility at the Lincoln Park Performing Arts Center

 

Project Allocation

2,500,000

(5)  Bedford Count

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(B)  Acquisition, infrastructure, renovations and construction costs related to the Hyndman Area Health Center upgrades and expansion

 

Project Allocation

1,000,000

(ii)  Everett Borough

 

(A)  Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for revitalization and infrastructure enhancement projects

 

Project Allocation

500,000

(iii)  Saxton Borough

 

(A)  Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for revitalization and infrastructure enhancement projects

 

Project Allocation

1,000,000

(iv)  West Providence Township

 

(A)  Construction of a new facility and capital improvements to existing facility at the Bedford Campus of Allegany College of Maryland, including infrastructure and other related costs

 

Project Allocation

2,875,000

(6)  Berks County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

5,000,000

(i.1)  Amity Township

 

(A)  Acquisition, renovation, infrastructure, construction and other costs related to the Amity Business and Industrial Park

 

Project Allocation

3,000,000

(B)  Land acquisition, clearing, site improvements, transportation improvements and installation and extension of utilities for a light industrial and business park

 

Project Allocation

3,000,000

(ii)  City of Reading

 

(A)  Construction of an outdoor track and field facility at Albright College, including related costs

 

Project Allocation

2,000,000

(B)  Construction, renovation, infrastructure and other related costs for the Reading Public Museum and Planetarium

 

Project Allocation

1,567,000

(C)  Acquisition, construction, infrastructure, redevelopment and other related costs for the Berks Women in Crisis Shelter

 

Project Allocation

2,500,000

(D)  Acquisition, renovations, rehabilitation, infrastructure, construction and other costs for revitalization of Lancaster Avenue from Route 10 to city line

 

Project Allocation

10,000,000

(E)  Construction, renovation, infrastructure and other costs related to Alvernia University Francis Hall main entrance

 

Project Allocation

1,300,000

(F)  Construction, renovation, infrastructure and other costs related to the revitalization of the former Reading Naval Marina Reserve Center

 

Project Allocation

8,000,000

(G)  Acquisition, renovations, rehabilitation, infrastructure, construction and other costs for revitalization of downtown Reading

 

Project Allocation

10,000,000

(H)  Construction, infrastructure and other costs related to the renovation of Reading Public Library's Main Branch

 

Project Allocation

1,000,000

(ii.1)  Longswamp Township

 

(A)  Construction, infrastructure, redevelopment and other costs related to the Lutheran Home at Topton Energy Green Initiative

 

Project Allocation

1,000,000

(ii.2)  Muhlenberg Township

 

(A)  Construction, renovation, infrastructure and other costs related to the Tuckerton Road Industrial Park

 

Project Allocation

1,800,000

(ii.3)  Perry Township

 

(A)  Acquisition, construction, infrastructure, redevelopment and other related costs for an industrial park

 

Project Allocation

3,000,000

(iii)  Richmond Township

 

(A)  Redevelopment of the Historic Inn at Moselem Springs, including related costs

 

Project Allocation

2,200,000

(7)  Blair County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(B)  Capital improvements to parks and other facilities for Central Blair Recreation and Parks Commission

 

Project Allocation

1,187,000

(C)  Redevelopment, demolition, reconstruction, site preparation, access improvements and acquisition of facilities in the Altoona/Blair County area

 

Project Allocation

20,000,000

(D)  Construction of multimunicipal complex at the South Altoona Business Park in the City of Altoona/Logan Township

 

Project Allocation

5,500,000

(E)  Design, acquisition, demolition and construction of infrastructure, including adjacent off-site improvements for the development of a multifaceted business park in the City of Altoona and Logan Township located in the vicinity of Norfolk Southern property, north and south of the Juniata 8th Street Bridge

 

Project Allocation

7,500,000

(F)  Redevelopment of Veterans Memorial Field, including construction and other related costs

 

Project Allocation

1,500,000

(G)  Altoona-Blair County Development Corporation, redevelopment, demolition, reconstruction, site preparation and access improvements focusing on urban centers throughout communities in Blair County

 

Project Allocation

3,500,000

(H)  Acquisition, demolition, redevelopment and construction of mixed-use, multitenant facilities in the City of Altoona and Logan Township

 

Project Allocation

4,000,000

(I)  Construction of a 30,000-square-foot multitenant industrial building to be located in the I-99 Enterprise campus, including related costs

 

Project Allocation

4,000,000

(J)  Infrastructure improvements for KOZ businesses and industrial sites located in Blair County with emphasis along the I-99 Corridor, including acquisition, construction, infrastructure, redevelopment and other related costs

 

Project Allocation

5,000,000

(K)  Design, acquisition and construction of infrastructure, including adjacent off-site improvements, for development of industrial/commercial properties located along I-99 in Northern Blair County

 

Project Allocation

4,000,000

(L)  Acquisition, environmental assessment, engineering and design for the construction of a new business park located along the I-99 Corridor in Southern Blair County, including construction and other related costs

 

Project Allocation

4,000,000

(M)  Acquisition, redevelopment, demolition, site preparation, access improvements and enhancement improvements focusing on urban center communities located throughout Blair County

 

Project Allocation

7,500,000

(N)  Acquisition, redevelopment, demolition and construction of mixed-use, multitenant and commercial facilities located along the I-99 Corridor

 

Project Allocation

5,000,000

(O)  Final design, engineering and construction of necessary infrastructure improvements to support the redevelopment of the former Car Shops property, including other related costs

 

Project Allocation

2,500,000

(P)  Altoona-Blair County Development Corporation, infrastructure, redevelopment, construction and other related costs for the construction of a Transportation Engineering Center of Excellence to support the expansion of Altoona's Penn State campus

 

Project Allocation

2,500,000

(Q)  Altoona-Blair County Development Corporation/Team Ten, LLC, for site development, planning, infrastructure improvements, redevelopment, construction and other costs related to the American Eagle Paper Mill warehousing production facility project

 

Project Allocation

2,000,000

(ii)  City of Altoona

 

(A)  Redevelopment of the Altoona Regional Health System's Bon Secours Hospital campus to support new commercial and industrial uses, including related costs

 

Project Allocation

5,000,000

(B)  Streetscape improvements to support the redevelopment of the Altoona Regional Health System's Altoona health campus, including construction and other related costs

 

Project Allocation

5,000,000

(C)  Capital improvements to the roundhouse at the Altoona Railroaders Museum for a training facility

 

Project Allocation

1,600,000

(D)  Acquisition and redevelopment of vacant, deteriorated buildings in downtown Altoona to support the future growth of Penn State Altoona's downtown educational complex

 

Project Allocation

2,000,000

(E)  Acquisition and demolition of property and construction of parking  transportation facilities located in downtown Altoona

 

Project Allocation

5,000,000

(F)  Acquisition, rehabilitation, construction and other related costs, including the abatement of hazardous materials for the construction of multifunctional parking facilities in downtown Altoona

 

Project Allocation

5,000,000

(iii)  Hollidaysburg Borough

 

(A)  Construction of a new facility for the Hollidaysburg Area Public Library

 

Project Allocation

2,000,000

(iv)  Tyrone Borough

 

(A)  Acquisition, infrastructure, rehabilitation, construction and other related costs, including the abatement of hazardous materials for the redevelopment of brownfields and construction of the Tyrone Riverwalk

 

Project Allocation

2,500,000

(8)  Bradford County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(B)  Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for a new critical access hospital

 

Project Allocation

3,000,000

(ii)  Athens Township

 

(A)  Infrastructure, construction and other related costs for the Valley Business Park access road project

 

Project Allocation

2,000,000

(9)  Bucks County

 

(i)  County Projects

 

(A)  Construction, infrastructure and other related costs at the Keystone Industrial Port Complex

 

Project Allocation

15,000,000

(B)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

5,000,000

(C)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

10,000,000

(D)  Acquisition, construction and other related costs for the development of a nonhospital drug-free residential program facility

 

Project Allocation

2,000,000

(E)  Acquisition, redevelopment, rehabilitation and renovations of property and buildings and equipment costs for a school for children with complex learning disabilities

 

Project Allocation

1,000,000

(F)  Acquisition, rehabilitation, renovations and other related costs for the expansion of a property for a community mental health center

 

Project Allocation

1,250,000

(G)  Acquisition, rehabilitation and renovations of a property for the development of the Pennsylvania Science Center

 

Project Allocation

2,000,000

(H)  Infrastructure and construction costs for a Life Science and Applied Learning Center to be constructed on the campus of the Delaware Valley College

 

Project Allocation

13,000,000

(I)  Acquisition, infrastructure, rehabilitation, construction and other related costs for the development of an integrated cluster of nonprofit and commercial discovery scientists center including, new chemistry, biochemistry, tissue culture, molecular biology and dry labs

 

Project Allocation

4,500,000

(J)  Renovations, rehabilitation and other costs related to the redevelopment of Twining Village, including new energy efficient equipment, green initiatives and energy-saving technologies

 

Project Allocation

500,000

(K)  Rehabilitation, construction and other related costs for renovations, energy- efficient improvements and updates to site exhibits at the Silver Lake Nature Cente5

 

Project Allocation

1,000,000

(i.1)  Bucks County Redevelopment Authority

 

(A)  Acquisition, infrastructure, renovations, rehabilitation, construction and other costs related to community improvements and beautification projects located within Langhorne Borough, Langhorne Manor Borough and Penndel Borough

 

Project Allocation

2,000,000

(i.2)  Bensalem Township

 

(A)  Acquisition, infrastructure, rehabilitation, construction and other related costs for the development of transitional housing units

 

Project Allocation

500,000

(B)  Acquisition, infrastructure, construction and other related costs for economic development-related projects for Route 95 Industrial Center

 

Project Allocation

750,000

(C)  Acquisition, infrastructure, construction and other related costs for the extension of the Galloway Road project for community-related economic development

 

Project Allocation

2,500,000

(D)  Acquisition of multipurpose building for the preservation of 130 acres of open space and economic development

 

Project Allocation

5,000,000

(E)  Acquisition, construction and infrastructure of a senior residential facility at the site located at Trevose and Somerton Roads

 

Project Allocation

2,500,000

(ii)  Bristol Township

 

(A)  Construction, renovations and infrastructure improvements in the Bucks County Enterprise Zone

 

Project Allocation

5,000,000

(B)  Rehabilitation, renovations, construction and other costs related to the expansion of an administration building

 

Project Allocation

2,500,000

(C)  Acquisition, site development, infrastructure improvements and construction and related costs needed to establish a research and development and related incubator facility at Bridge Business Center

 

Project Allocation

6,000,000

(D)  Infrastructure, renovations, rehabilitation and construction costs related to boiler replacements with high efficiency units at the Lower Bucks Hospital

 

Project Allocation

750,000

(E)  Infrastructure, renovations, rehabilitation and construction costs related to roof replacement and parking lot repairs and improvements at the Lower Bucks Hospital

 

Project Allocation

1,000,000

(ii.2)  Doylestown Borough

 

(A)  Acquisition, redevelopment and construction of a 6.24-acre site to include open space, a park and commercial development of the historically significant structure on site to serve the Doylestown community

 

Project Allocation

5,000,000

(iii)  Doylestown Township

 

(A)  Construction of an integrated science and applied learning center for Delaware Valley College, including related costs

 

Project Allocation

13,000,000

(iv)  Falls Township

 

(A)  Acquisition, infrastructure, construction and other related costs for an industrial facility at the Keystone Industrial Port Complex

 

Project Allocation

30,000,000

(B)  Acquisition, infrastructure, construction and other related costs for a facility at the Keystone Industrial Port Complex for commercial, industrial or multipurpose use

 

Project Allocation

5,000,000

(v)  Hilltown Township

 

(A)  Infrastructure, renovations, rehabilitation and restoration of the Pearl S. Buck House

 

Project Allocation

780,000

(v.1)  Ivyland Borough

 

(A)  Acquisition of building currently housing the Johnsville Centrifuge & Science Museum

 

Project Allocation

1,000,000

(v.2)  Lower Makefield Township

 

(A)  Construction, infrastructure, redevelopment and other related costs for an athletic complex and community center

 

Project Allocation

2,000,000

(v.3)  Middletown Township

 

(A)  Infrastructure, renovations, rehabilitation, roadway improvements, construction and other costs related to stormwater management and flood mitigation on South Flowers Mill Road

 

Project Allocation

500,000

(vi)  Milford Township

 

(A)  Acquisition, construction, infrastructure, redevelopment and other related costs for the St. Luke's Quakertown Hospital expansion project

 

Project Allocation

10,000,000

(vii)  Newtown Township

 

(A)  Construction, infrastructure, redevelopment and other related costs to renovate and expand the Newtown Athletic Club

 

Project Allocation

1,000,000

(B)  Construction, infrastructure, redevelopment and other related costs for athletic complex renovations

 

Project Allocation

1,000,000

(viii)  Quakertown Borough

 

(A)  Acquisition and redevelopment costs for revitalization projects

 

Project Allocation

1,500,000

(ix)  Sellersville Borough

 

(A)  Renovation and expansion of the main building at Penn Foundation, including related infrastructure costs

 

Project Allocation

4,500,000

(x)  Upper Southampton Township

 

(A)  Construction, infrastructure, redevelopment and other related costs for improvements to storm water management in the township

 

Project Allocation

600,000

(B)  Acquisition, construction, infrastructure, redevelopment and other related costs for an economic development project in the township

 

Project Allocation

1,000,000

(xi)  Warminster Township

 

(A)  Construction, infrastructure, redevelopment and other related costs for improvements to storm water management in the township

 

Project Allocation

600,000

(B)  Acquisition, construction, infrastructure, redevelopment and other related costs for an economic development project in the township

 

Project Allocation

1,000,000

(xii)  Warrington Township

 

(A)  Acquisition, construction, infrastructure, redevelopment and other related costs for an economic development project in the township

 

Project Allocation

1,000,000

(xiii)  Warwick Township

 

(A)  Construction, infrastructure and related redevelopment costs for a new firehouse

 

Project Allocation

1,000,000

(B)  Construction, infrastructure and other related costs for the construction of a state-of-the-art firehouse, including solar energy, geothermal energy and LED lighting

 

Project Allocation

1,500,000

(10)  Butler County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(B)  Infrastructure, construction, renovations and other related costs for a multiphase capital improvement and expansion project at Butler Health System and related health care facilities

 

Project Allocation

3,000,000

(C)  Construction, infrastructure and other related costs for a full-service, year-round baseball and sports training facility

 

Project Allocation

1,500,000

(ii)  Community Development Corporation of Butler County

 

(A)  Construction, acquisition and development of buildings, including site improvements for economic development projects, in southern Butler County

 

Project Allocation

5,000,000

(iii)  City of Butler

 

(A)  Acquisition, infrastructure, renovations, redevelopment of buildings and construction of a center city complex, including the preservation of historic sites

 

Project Allocation

6,000,000

(iv)  Buffalo Township

 

(A)  Acquisition, infrastructure, construction and storm water management for the Buffalo Township Business and Technology Park

 

Project Allocation

1,500,000

(v)  Slippery Rock Township

 

(A)  Acquisition, infrastructure, construction and storm water management for Phase I of the Slippery Rock Business Park

 

Project Allocation

1,500,000

(11)  Cambria County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(B)  Construction, infrastructure, redevelopment and other related costs for the Cambria County Industrial Development Park

 

Project Allocation

1,500,000

(i.1)  Cresson Township

 

(A)  Construction, renovation, infrastructure and other related costs for the Mount Aloysius College Convocation Center

 

Project Allocation

10,000,000

(i.2)  Jackson Township

 

(A)  Acquisition, construction, infrastructure, redevelopment and other related costs for a business park

 

Project Allocation

5,000,000

(ii)  City of Johnstown

 

(A)  Construction, acquisition, infrastructure, redevelopment and other related costs for the John P. Murtha Innovation Lab

 

Project Allocation

1,000,000

(B)  Construction, acquisition, infrastructure, redevelopment and other related costs for the Main Street West redevelopment multi-use district project

 

Project Allocation

4,000,000

(C)  Construction, acquisition, infrastructure, redevelopment and other related costs for Stonycreek River Park

 

Project Allocation

2,000,000

(D)  Construction, infrastructure, redevelopment and other related costs for alternative community resource program facilities renovations

 

Project Allocation

2,000,000

(E)  Construction, renovation, infrastructure and other related costs for the UPMC/Conemaugh Cancer Center

 

Project Allocation

1,000,000

(F)  Acquisition, renovations, rehabilitation, infrastructure, construction and other costs for the restoration of the former State Theater

 

Project Allocation

2,000,000

(G)  Acquisition, renovations, rehabilitation, infrastructure, construction and other costs for an ammunition manufacturing facility

 

Project Allocation

10,000,000

(H)  Construction, infrastructure and other costs related to a collapsible dam on the Stoneycreek River for recreational activities

 

Project Allocation

5,000,000

(ii.1)  Loretto Borough

 

(A)  Construction, renovation, infrastructure and other related costs for the Southern Alleghenies Museum of Art

 

Project Allocation

10,000,000

(B)  Construction, renovation, infrastructure and other related costs for the Saint Francis University science center

 

Project Allocation

15,000,000

(C)  Construction, renovation, infrastructure and other related costs for the Saint Francis University multipurpose business center

 

Project Allocation

10,000,000

(D)  Construction, renovation, infrastructure and other related costs for the Saint Francis University Doyle Hall Cultural Arts Center

 

Project Allocation

3,000,000

(iii)  Richland Township

 

(A)  Construction, infrastructure, redevelopment and other related costs for the Richland Township multi-use facility and community building

 

Project Allocation

1,500,000

(B)  Construction, infrastructure, redevelopment and other costs related to the East Hills regional recreation facility

 

Project Allocation

6,000,000

(iv)  Upper Yoder Township

 

(A)  Construction, renovation, infrastructure and other related costs for a multitenant incubator building in the Cambria County Industrial Park

 

Project Allocation

1,000,000

(B)  Acquisition, construction, infrastructure, redevelopment and other related costs for a multimunicipal building

 

Project Allocation

1,000,000

(12)  Cameron County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(ii)  Cameron County Industrial Development Authority

 

(A)  Construction, acquisition, infrastructure and other related costs for the establishment of a new site for the expansion of the GKN Pennsylvania Tool Shops

 

Project Allocation

2,500,000

(13)  Carbon County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(ii)  East Side Borough/Kidder Township

 

(A)  Construction, infrastructure and other related costs for the White Haven recreation improvement project

 

Project Allocation

4,000,000

(iii)  Franklin Township

 

(A)  Construction, infrastructure and other related costs for a new township and community building

 

Project Allocation

1,000,000

(iv)  Jim Thorpe Borough

 

(A)  Acquisition and other related costs for land in Lehigh Gorge State Park

 

Project Allocation

3,500,000

(v)  Lehighton Borough

 

(A)  Acquisition, construction, infrastructure and other related costs for a new fire station

 

Project Allocation

2,125,000

(vi)  Towamensing Township

 

(A)  Construction, infrastructure and other related costs for a new township and community building

 

Project Allocation

2,000,000

(14)  Centre County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(B)  Land acquisition, infrastructure improvements, construction and other related costs necessary to maintain the competitive position of an existing business entity or for the development of business-ready sites for potential business tenants

 

Project Allocation

2,000,000

(ii)  Patton Township

 

(A)  Acquisition, infrastructure, construction and other related costs for the Second Mile Learning Center

 

Project Allocation

5,000,000

(iii)  Rush Township

 

(A)  Revitalization of the former PAH site, including construction and other related costs

 

Project Allocation

5,000,000

(B)  Construction, redevelopment and other related costs for a new arts and cultural entertainment center

 

Project Allocation

10,000,000

(C)  Construction of a new firehouse in Philipsburg, including related costs

 

Project Allocation

2,000,000

(15)  Chester County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

5,000,000

(B)  Acquisition, construction, infrastructure, redevelopment and other related costs for the Chester County Stadium development projec5

 

Project Allocation

20,000,000

(C)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

10,000,000

(D)  Construction, infrastructure and other related costs for the West Pharmaceutical Services Chester County construction project

 

Project Allocation

10,000,000

(E)  Renovations, rehabilitation, construction and other related costs for solar improvement projects in cultural facilities

 

Project Allocation

500,000

(F)  Construction, renovations and infrastructure improvements for a performing arts/multicultural facility

 

Project Allocation

5,000,000

(G)  Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for community revitalization projects

 

Project Allocation

10,000,000

(H)  Land acquisition, construction and infrastructure improvements related to a multipurpose event center

 

Project Allocation

10,000,000

(I)  Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for improvements to park facilities

 

Project Allocation

20,000,000

(J)  Renovations, rehabilitation and construction related to the expansion of the Whitlock Employment Services facilities

 

Project Allocation

1,000,000

(i.1)  Chester County Industrial Development Authority

 

(A)  Construction, redevelopment and other related costs for reusing an outdated building as a regional technology center

 

Project Allocation

2,000,000

(B)  Construction, infrastructure and other related costs of redeveloping an industrially zoned site into a modern regional commercial park

 

Project Allocation

2,500,000

(C)  Infrastructure, redevelopment and other related costs for the industrial revitalization of the Church Road area and contiguous sites

 

Project Allocation

3,000,000

(i.2)  City of Exton

 

(A)  Construction and other related costs for the Fibrocell project

 

Project Allocation

2,000,000

(ii)  Atglen Borough

 

(A)  Construction, infrastructure, redevelopment and other related costs for expansion of the Itp Sellars nonwovens manufacturing plant

 

Project Allocation

1,500,000

(ii.1)  Downingtown Borough

 

(A)  Construction, site preparation and other related costs for the Bishop Shanahan High School athletic facilities complex

 

Project Allocation

500,000

(B)  Construction, infrastructure and other related costs for the Chester County Technical College Brandywine development project

 

Project Allocation

6,000,000

(ii.2)  East Bradford Township

 

(A)  Construction, renovation, infrastructure and other related costs for the Chester County Art Association stability renewal project

 

Project Allocation

750,000

(ii.3)  East Coventry Township

 

(A)  Construction, infrastructure, site development and other related costs for the Ridge Fire Company building expansion

 

Project Allocation

1,000,000

(B)  Construction, land acquisition, site development and other related costs for Frick's Lock Village

 

Project Allocation

500,000

(iii)  East Whiteland Township

 

(A)  Construction of a new nursing/science building and renovation of existing science building, including related costs, at Immaculata University

 

Project Allocation

20,000,000

(B)  Construction, site development and other related costs for the People's Light and Theater expansion development project

 

Project Allocation

500,000

(C)  Construction, infrastructure, site development and other related costs for the Volunteer Fire Association fire house expansion project

 

Project Allocation

1,000,000

(D)  Infrastructure, construction and other  related costs for the Deerfield Corporate Center retail/office complex

 

Project Allocation

4,300,000

(iii.1)  Kennett Square

 

(A)  Renovations, rehabilitation, construction and other costs related to the Holcomb Behavioral Health Systems, including extensive building improvements, a new parking lot and new HVAC units

 

Project Allocation

500,000

(iv)  London Grove Township

 

(A)  Acquisition, construction, redevelopment and other related costs for the Chester County youth fitness complex

 

Project Allocation

500,000

(v)  Londonderry Township

 

(A)  Acquisition, construction, redevelopment and other related costs to renovate the historic White Horse Inn

 

Project Allocation

1,000,000

(v.1)  Malvern Borough

 

(A)  Construction, site development and other related costs for the Malvern outdoor athletic facilities complex at Malvern Preparatory School

 

Project Allocation

500,000

(B)  Construction, infrastructure, site development and other related costs for the Malvern Fire Company building expansion

 

Project Allocation

1,000,000

(vi)  New Garden Township

 

(A)  Construction of base hangar at New Garden Flying Field

 

Project Allocation

1,139,000

(B)  Construction of public use terminal building at New Garden Flying Field

 

Project Allocation

1,119,000

(vii)  Oxford Borough

 

(A)  Acquisition, construction, infrastructure, redevelopment and other related costs for restoration of the Old Oxford Borough Theater

 

Project Allocation

800,000

(vii.1)  Phoenixville Borough

 

(A)  Land acquisition, construction, infrastructure and other related costs for the Phoenixville Steel site

 

Project Allocation

12,500,000

(B)  Acquisition, construction and other related costs for the renovation of the historic Chester County Bank building

 

Project Allocation

500,000

(C)  Construction, infrastructure, redevelopment and related costs for the Franklin Commons adaptive reuse project

 

Project Allocation

1,000,000

(viii)  South Coatesville Borough

 

(A)  Acquisition, construction, infrastructure, redevelopment and other related costs for the First Avenue Corridor revitalization project

 

Project Allocation

1,552,000

(ix)  Tredyffrin Township and Willistown Township

 

(A)  Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment and other related costs for the Paoli Transit center

 

Project Allocation

20,000,000

(x)  Wallace Township

 

(A)  Acquisition, construction, infrastructure, redevelopment and other related costs for Valhalla Brandywine

 

Project Allocation

20,000,000

(xi)  West Chester Borough

 

(A)  Construction, infrastructure, redevelopment and other related costs to renovate the Safe Harbor Homeless Shelter

 

Project Allocation

500,000

(B)  Construction, infrastructure, site development and other related costs for the Fame Fire Company Building expansion

 

Project Allocation

1,000,000

(xii)  West Whiteland Township

 

(A)  Land acquisition, construction, infrastructure and other related costs for the Chester County Bioscience Park development project

 

Project Allocation

2,000,000

(16)  Clarion County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(ii)  Clarion Borough

 

(A)  Acquisition, infrastructure, site planning, construction and other related costs for the redevelopment of the O-I Clarion site

 

Project Allocation

1,000,000

(B)  Infrastructure, construction and other related costs for the Greenville Avenue sidewalk project, running from Reinhard Village to Clarion University

 

Project Allocation

400,000

(C)  Infrastructure, construction and other related costs for the rehabilitation of the historic Clarion Fire Hall, including roofing, interior and exterior improvements and new facade

 

Project Allocation

550,000

(iii)  Monroe Township

 

(A)  Acquisition, infrastructure and construction of the Primary Health Network facility located in Trinity Point at Monroe Health Care Center

 

Project Allocation

750,000

(B)  Development, construction, acquisition of equipment and other related costs for the Clarion Research Group Biotechnology Manufacturing expansion project

 

Project Allocation

3,200,000

(17)  Clearfield County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(B)  Construction, infrastructure and other related costs for a reclamation facility to process flowback fluid associated with the Marcellus Shale gas drilling

 

Project Allocation

7,500,000

(C)  Acquisition, renovations, rehabilitation, equipment and other related costs for a school for children with complex learning disabilities

 

Project Allocation

1,000,000

(D)  Acquisition, construction, redevelopment and other related costs for Phase II of the Clearfield Firemen's Commerce Park project in Lawrence Township

 

Project Allocation

5,000,000

(ii)  Clearfield County Economic Development Corporation

 

(A)  Acquisition, infrastructure, site planning, construction and other related costs for the construction of a Marcellus Shale industrial multitenant building to be located in a former brownfield site

 

Project Allocation

1,250,000

(iii)  City of Dubois

 

(A)  Infrastructure, construction and other related costs for expansion of the DuBois Regional Medical Center, including construction of an outpatient surgery center

 

Project Allocation

4,000,000

(iv)  Bradford Township

 

(A)  Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for the development of a flowback and production wastewater plant to treat and recycle hydrofracture water produced from Marcellus Shale natural gas drillers

 

Project Allocation

4,500,000

(v)  Morris Township

 

(A)  Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for the development of a flowback and production wastewater and acid mine drainage treatment plants to treat and recycle hydrofracture and acid mine water

 

Project Allocation

6,000,000

(vi)  Philipsburg

 

(A)  Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for the development of flowback and production wastewater and acid mine drainage treatment plants to treat and recycle hydrofracture and acid mine water

 

Project Allocation

6,000,000

(vii)  Sandy Township

 

(A)  Design, construction, infrastructure improvements and other related costs for the development of a Marcellus Shale enterprise center

 

Project Allocation

10,000,000

(18)  Clinton County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(B)  Infrastructure, redevelopment and other related costs for the expansion of broadband fiber and wireless communication infrastructure from downtown Lock Haven into northern Clinton County

 

Project Allocation

3,000,000

(ii)  City of Lock Haven

 

(A)  Construction and other related costs for the Annie Halenbake Ross Library renovation project

 

Project Allocation

500,000

(B)  Infrastructure and other related costs to replace the fiber-optic network at Lock Haven University

 

Project Allocation

1,950,000

(C)  Construction, infrastructure, redevelopment and other related costs for the demolition of various buildings on the Lock Haven University campus

 

Project Allocation

850,000

(D)  Construction, infrastructure, redevelopment and other related costs to renovate Lock Haven University's Ulmer South Hall

 

Project Allocation

4,700,000

(iii)  Bald Eagle Township

 

(A)  Construction, infrastructure and other related costs for the Avery Dennison Performance Adhesive Center and Pilot Facility

 

Project Allocation

3,250,000

(iv)  Renovo Borough

 

(A)  Construction, infrastructure, redevelopment and other related costs for Bucktail Medical Center improvements

 

Project Allocation

500,000

(v)  Wayne Township

 

(A)  Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for the development of a flowback and production wastewater plant to treat and recycle hydrofracture water produced from Marcellus Shale natural gas drillers

 

Project Allocation

4,000,000

(19)  Columbia County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(B)  Construction and infrastructure for an affordable housing project, including necessary costs

 

Project Allocation

3,000,000

(20)  Crawford County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(B)  Acquisition, rehabilitation and redevelopment of properties within the corridor leading into the Allegheny College community, including energy efficiency renovation and facade improvements

 

Project Allocation

10,000,000

(C)  Development of a Regional Health Information Organization (RHIO), including necessary infrastructure, to support the operations of a Healthcare Information Exchange (HIE) for member hospitals of the Vantage Corporation in North Central and North West Pennsylvania

 

Project Allocation

1,400,000

(ii)  City of Meadville

 

(A)  Renovation of Meadville Medical Center for new interventional and imaging services in the radiology and cardiology departments, including construction, infrastructure and other related costs

 

Project Allocation

1,100,000

(iii)  Greenwood Township

 

(A)  Infrastructure improvements to the Keystone Regional Industrial Park,  including construction of a roadway extension, sanitary sewers, storm water management facilities and power utility infrastructure, as well as improvements of the water and sewer systems

 

Project Allocation

5,000,000

(B)  Acquisition, infrastructure, site planning, construction, abatement of hazardous materials, storm water management and other related costs, for the next phase of development to the Keystone Regional Industrial Park, a Keystone Opportunity Zone

 

Project Allocation

5,000,000

(iv)  Vernon Township

 

(A)  Construction, renovation and redevelopment of the Crawford Business Park

 

Project Allocation

3,000,000

(B)  Infrastructure, site planning, construction, abatement of hazardous materials and other related costs, for the next phase of development to the main complex located at the Crawford Business Park

 

Project Allocation

3,000,000

(21)  Cumberland County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

5,000,000

(B)  Acquisition, renovations, expansion and construction of facilities for Giant Food Stores and Ahold USA, including a perishable distribution center expansion and office space to reorganize support operations

 

Project Allocation

4,000,000

(ii)  Cumberland Area Economic Development Corporation

 

(A)  Acquisition, infrastructure, construction, abatement of hazardous materials, renovations, rehabilitation and other related costs for upgrades and development of an advanced biofuel facility

 

Project Allocation

2,500,000

(iii)  Cumberland County Industrial Development

 

(A)  Acquisition, construction, infrastructure and other related costs for an industrial/commercial facility at the Interstate 81 Commerce Park

 

Project Allocation

3,000,000

(iv)  Cumberland County Redevelopment Authority

 

(A)  Acquisition, construction, infrastructure, environmental remediation and other related costs for the redevelopment of an industrial site located on Spring Road in the Borough of Carlisle

 

Project Allocation

2,500,000

(B)  Acquisition, construction, infrastructure, environmental remediation and other related costs for the redevelopment of an industrial site located on North College Street in the Borough of Carlisle

 

Project Allocation

2,500,000

(C)  Construction, renovation, rehabilitation and other related costs for Kaufman Hall at Dickinson College located in the Borough of Carlisle

 

Project Allocation

1,500,000

(v)  East Pennsboro Township

 

(A)  Acquisition, renovations and construction of a new facility for Highmark Blue Shield

 

Project Allocation

4,000,000

(B)  Acquisition, construction, infrastructure and other related costs for the creation of a state-of-the-art electronic data center located at the Holy Spirit Hospital

 

Project Allocatio

5,000,000

(v.1)  Shippensburg Borough

 

(A)  Acquisition, construction, infrastructure and other related costs for the construction of the Shippensburg Emergency Services building

 

Project Allocation

3,000,000

(B)  Construction, renovations and infrastructure improvements for an industrial facility

 

Project Allocation

2,000,000

(vi)  South Middleton Township

 

(A)  Acquisition, construction, infrastructure and other related costs for the construction of a new dining facility at the Diakon Lutheran Social Ministries Wilderness Center

 

Project Allocation

500,000

(vii)  Upper Allen Township

 

(A)  Rehabilitation, renovation, construction, infrastructure and other related costs to meet modern needs, including ADA requirements, HVAC and technology upgrades for buildings on the campus of Messiah College

 

Project Allocation

1,750,000

(22)  Dauphin County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

5,000,000

(B)  Acquisition, construction, renovations, infrastructure and other related costs for a Keystone Human Services Administrative Building and additional residential service sites to provide services in the areas of intellectual disabilities, mental health and autism, including the new Adult Community Autism Program

 

Project Allocation

3,000,000

(C)  Acquisition, construction, infrastructure, redevelopment and other related costs for facilities to deliver educational and exhibition services at the Antique Automobile Club of America

 

Project Allocation

15,000,000

(i.1)  Dauphin County Redevelopment Authority

 

(A)  Rehabilitation, renovation, construction and other related costs to complete the Lykens Valley Rail Trail and renovate associated recreation field

 

Project Allocation

500,000

(B)  Rehabilitation, renovation and other related costs to renovate the historic Colonade Theatre to be used for community events

 

Project Allocation

750,000

(ii)  City of Harrisburg

 

(A)  Acquisition, infrastructure, construction and other related costs for construction of a Pennsylvania State Firefighters Memorial

 

Project Allocation

500,000

(B)  Redevelopment of the Furlow Building on North Third Street in the Midtown section of Harrisburg

 

Project Allocation

4,000,000

(C)  Construction, infrastructure, redevelopment and other related costs for the PinnacleHealth Harrisburg Hospital campus

 

Project Allocation

30,000,000

(D)  Acquisition, construction, infrastructure, redevelopment and other related costs for a supermarket project at 29th Street and Rudy Road

 

Project Allocation

5,000,000

(E)  Construction, acquisition, infrastructure, redevelopment and other related costs for an urban redevelopment project within a four-block area bounded by Maclay and Muench Streets and Second and Third Streets

 

Project Allocation

3,000,000

(F)  Acquisition, new construction and rehabilitation of the Labor Capital campus of Pennsylvania

 

Project Allocation

25,000,000

(G)  Construction, renovation, rehabilitation, redevelopment, infrastructure improvement and other related costs at the Harrisburg Resource Recovery Facility

 

Project Allocation

1,500,000

(H)  Construction, renovation, rehabilitation, replacement, redevelopment, infrastructure improvement and other related costs of the steam transmission lines and system located in the City of Harrisburg

 

Project Allocation

8,000,000

(iii)  Derry Township

 

(A)  Construction of Children's Hospital at Penn State Milton S. Hershey Medical Center, including related costs

 

Project Allocation

10,500,000

(B)  Acquisition and construction of fire station for the Hershey Volunteer Fire Department, including related costs

 

Project Allocation

5,400,000

(C)  Acquisition of trolley car barn for the Derry Township Historical Society, including related costs

 

Project Allocation

4,500,000

(D)  Development and construction of a commercial land area of approximately 225 acres along Route 743/Hershey Park Drive

 

Project Allocation

25,000,000

(iv)  Halifax Township

 

(A)  Construction and improvements to Fort Halifax Park, including acquisition of land and other related costs

 

Project Allocation

5,000,000

(v)  Lower Swatara Township

 

(A)  Construction of a mass transit station and shopping facility, including infrastructure and other related costs

 

Project Allocation

10,600,000

(B)  Construction, infrastructure and associated costs for the demolition and redevelopment of the former Harrisburg International Airport terminal building

 

Project Allocation

3,000,000

(vi)  Susquehanna Township

 

(A)  Expansion and development of business park property along the Progress Avenue business corridor

 

Project Allocation

1,300,000

(23)  Delaware County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

5,000,000

(B)  Acquisition, construction, infrastructure and other related costs for retail development in Upper Darby

 

Project Allocation

5,000,000

(C)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

10,000,000

(D)  Acquisition, renovations, rehabilitation, construction and other costs related to the Old Chester Court House, courtyard and adjacent property

 

Project Allocation

3,000,000

(E)  Infrastructure, renovations, rehabilitation, construction and other costs for medical care facilities

 

Project Allocation

10,000,000

(F)  Acquisition, infrastructure, renovations, rehabilitation, construction and other costs for higher education facilities

 

Project Allocation

10,000,000

(G)  Acquisition, infrastructure, renovations, construction and other related costs for improvements to park facilities

 

Project Allocation

20,000,000

(H)  Construction, renovation and land acquisition related to historical sites in the City of Chester

 

Project Allocation

1,000,000

(I)  Delaware County Housing Authority  Acquisition, infrastructure, construction and other costs related to Phase IV of the Delaware County Fairgrounds housing development initiative

 

Project Allocation

1,500,000

(J)  Delaware County Commerce Center, for acquisition, construction, renovation, infrastructure and other related costs for the Stratford Friends School

 

Project Allocation

5,500,000

(i.1)  Delaware County Redevelopment Authority

 

(A)  Acquisition, redevelopment, construction and other related costs for the development of a state-of-the-art Green Energy Apprentice Training Center

 

Project Allocation

500,000

(B)  Acquisition, remediation, demolition, infrastructure, construction and other related costs, including the abatement of hazardous materials, for Phase II of the Penn Hills area redevelopment project, including the construction of new townhouse units

 

Project Allocation

1,500,000

(ii)  City of Chester

 

(A)  Rehabilitation and enhancement to the Union Square Neighborhood Revitalization District including blight removal, streetscape, remediation and new construction

 

Project Allocation

10,000,000

(B)  Acquisition, renovations, rehabilitation, construction and other costs related to a food distribution center

 

Project Allocation

1,000,000

(C)  Acquisition, renovations, rehabilitation, construction and other costs related to citywide gateways improvement project

 

Project Allocation

2,500,000

(iii)  Bethel Township

 

(A)  Construction and infrastructure for an industrial facility

 

Project Allocation

1,500,000

(iii.1)  Collingdale Borough

 

(A)  Construction and restoration of the Historic Eden Cemetery

 

Project Allocation

5,000,000

(iii.2)  Concord Township

 

(A)  Acquisition, renovations, rehabilitation, construction and other costs related to the expansion of the Darlington Arts Center facility

 

Project Allocation

2,000,000

(iii.3)  Darby Borough

 

(A)  Construction, renovation, infrastructure and other related costs for the Darby Borough multimunicipal complex center

 

Project Allocation

4,800,000

(iv)  Haverford Township

 

(A)  Construction, infrastructure and other related costs for a community recreation/environmental facility

 

Project Allocation

4,000,000

(B)  Acquisition, construction, infrastructure, redevelopment and other related costs for the Haverford Township Area YMCA

 

Project Allocation

15,000,000

(iv.1)  Kennett Square

 

(A)  Renovations, rehabilitation, construction and other costs related to the Holcomb Behavioral Health Systems, including extensive building improvements, a new parking lot and new HVAC units

 

Project Allocation

500,000

(v)  Lansdowne Borough

 

(A)  Restoration of the historic Lansdowne Theater and 20 Lansdowne Court, including construction and other related costs

 

Project Allocation

3,000,000

(B)  Construction, infrastructure, redevelopment and other costs related to the Historic Lansdowne Theater Project and CBD enhancements

 

Project Allocation

13,000,000

(v.1)  Marcus Hook Borough

 

(A)  Construction, renovations, rehabilitation and other related costs for the redevelopment of property adjacent to the Marcus Hook SEPTA train station

 

Project Allocation

1,500,000

(vi)  Marple Township

 

(A)  Construction of a new township government facility, including related costs

 

Project Allocation

1,000,000

(vi.1)  Media Borough

 

(A)  Infrastructure, renovations, rehabilitation, construction and other costs related to water safety and infrastructure improvement projects

 

Project Allocation

5,000,000

(B)  Renovations, construction and other related costs for the rehabilitation of the Elwyn Development Center

 

Project Allocation

1,000,000

(vi.2)  Middletown Township

 

(A)  Construction and infrastructure costs related to the development of a pedestrian-oriented, mixed-use Town Center to include office space, commercial space, dwelling units, hotel rooms and open space

 

Project Allocation

10,000,000

(vi.3)  Newtown Township

 

(A)  Construction, infrastructure and related development costs for a project that will include retail, office, residential and recreational uses

 

Project Allocation

15,000,000

(vii)  Radnor Township

 

(A)  Acquisition of land from Valley Forge Military Academy for the purpose of developing an arts-centered educational program for college students with Asperger's Syndrome at Eastern University, including related costs

 

Project Allocation

2,000,000

(B)  Construction, redevelopment, infrastructure and other costs related to the Francisvale Medical and Behavioral Care Facility

 

Project Allocation

500,000

(vii.1)  Ridley Township

 

(A)  Acquisition, construction, infrastructure and other related costs for an industrial/commercial facility at Stewart and Sellers Avenues in Ridley Township

 

Project Allocation

3,000,000

(viii)  Rutledge Borough and Morton Borough

 

(A)  Acquisition, construction, infrastructure, redevelopment and other related costs for a firehouse consolidation project

 

Project Allocation

750,000

(ix)  Springfield Township

 

(A)  Major upgrade to electrical distribution system at Springfield Hospital, including construction, infrastructure and related costs

 

Project Allocation

2,100,000

(x)  Swarthmore Borough

 

(A)  Construction, infrastructure and other related costs for the construction of a new educational facility at Swarthmore College

 

Project Allocation

10,000,000

(xi)  Tinicum Township

 

(A)  Acquisition, infrastructure, construction and other related costs for a new municipal building and police station

 

Project Allocation

1,000,000

(xii)  Upland Borough

 

(A)  Upgrade of central health and cooling systems for Crozer-Keystone Health System, including construction, infrastructure and other related costs

 

Project Allocation

3,200,000

(xiii)  Upper Darby Township

 

(A)  Renovations, rehabilitation, construction and other costs related to the Holcomb Behavioral Health Systems, including extensive building improvements, a new parking lot and new HVAC units

 

Project Allocation

500,000

(xiv)  Upper Providence Township

 

(A)  Construction, infrastructure, redevelopment and other related costs for Brookhaven municipal building renovations

 

Project Allocation

500,000

(xv)  Yeadon Borough

 

(A)  Redevelopment, infrastructure, construction and other costs related to the Yeadon Swim Club development project

 

Project Allocation

7,000,000

(24)  Elk County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(ii)  City of St. Marys

 

(A)  Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for expansion of the Straub Brewery

 

Project Allocation

3,500,000

(iii)  Horton Township

 

(A)  Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for the development of a flowback and production wastewater plant to treat and recycle hydrofracture water produced from Marcellus Shale natural gas drillers

 

Project Allocation

4,000,000

(25)  Erie County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

5,000,000

(B)  Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for exhibits at the Erie Zoo

 

Project Allocation

500,000

(i.1)  Erie County General Authority

 

(A)  Construction and implementation of activities in support of the Erie Inland Port initiative, including, but not limited to, railroad-related construction, infrastructure for rail-truck transfer facilities, logistics business parks, enhanced port infrastructure and intermodal terminals

 

Project Allocation

30,000,000

(i.2)  Erie Metropolitan Transit Authority

 

(A)  Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs to facilitate construction of an economic development project in the City of Erie to acquire property, remove vacant and dilapidated structures and construct a new joint operations and maintenance facility

 

Project Allocation

2,000,000

(i.3)  Erie - Western Pennsylvania Port Authority

 

(A)  Construction and other costs related to construction of a new indoor boat storage facility and lift well for economic development purposes at the port

 

Project Allocation

4,500,000

(B)  Costs related to a sheet piling project of the shipyard's west slip for economic development purposes at the port

 

Project Allocation

5,000,000

(C)  Renovations, rehabilitation and other related costs for a port terminal facility expansion project, including storage areas for economic development purposes at the port

 

Project Allocation

5,000,000

(D)  Renovations, rehabilitation and other related costs for reroofing of the shipyard building for economic development purposes at the port

 

Project Allocation

5,000,000

(i.4)  Redevelopment Authority of the City of Corry

 

(A)  Infrastructure, renovations, rehabilitation and other related costs for the Corry multitenant facility, including roof replacement and installation of a solar array

 

Project Allocation

600,000

(ii)  City of Corry

 

(A)  Acquisition, renovations, rehabilitation, construction, equipment and other related costs for a new critical access hospital, including the construction of and the equipping of a ten-bed geriatric behavioral health unit

 

Project Allocation

9,500,000

(iii)  City of Erie

 

(A)  Acquisition, remediation, construction, renovation and other related costs for an industrial facility

 

Project Allocation

2,000,000

(B)  Acquisition, remediation, construction, renovation and other related costs for a manufacturing facility

 

Project Allocation

2,000,000

(C)  Construction, redevelopment and other related costs for the Blasco Library parking project

 

Project Allocation

1,000,000

(D)  Construction, redevelopment and other related costs for the Pleasant Ridge Manor replacement project

 

Project Allocation

1,000,000

(E)  Acquisition, construction, infrastructure, redevelopment and other related costs for the Rexam Warehouse Facility expansion project

 

Project Allocation

3,000,000

(F)  Acquisition, infrastructure, abatement of hazardous materials and other related costs for the Bayfront Convention Center Brownfield Site redevelopment project

 

Project Allocation

6,500,000

(G)  Acquisition, construction, infrastructure, redevelopment and other related costs for the Mid-Town revitalization project

 

Project Allocation

2,000,000

(H)  Construction, infrastructure, redevelopment and other related costs for the SafeNet Big Backyard project

 

Project Allocation

1,000,000

(I)  Construction, infrastructure, redevelopment and other related costs for the Perry Square revitalization project

 

Project Allocation

1,100,000

(J)  Acquisition, construction, redevelopment and other related costs for the Erie Metropolitan Transit Authority Facility

 

Project Allocation

3,000,000

(K)  Construction, infrastructure and other related costs for a new academic building at Mercyhurst College

 

Project Allocation

3,500,000

(L)  Construction, infrastructure, redevelopment and other related costs for an access to care and neighborhood revitalization project

 

Project Allocation

1,000,000

(M)  Infrastructure, construction, equipment and other related costs for the development of the Center for Academic Engagement, located on the campus of Mercyhurst College

 

Project Allocation

3,500,000

(N)  Renovations, rehabilitation, construction and other related costs for a high-efficiency energy center

 

Project Allocation

4,000,000

(O)  Renovations, rehabilitation, construction and other related costs for enhancements to an emergency room facility and the creation of a state-of-the-art emergency department

 

Project Allocation

4,500,000

(P)  Expansion of Lake Erie College of Osteopathic Medicine, including design, infrastructure, construction and other related costs for new buildings and facilities

 

Project Allocation

25,000,000

(iv)  Lawrence Park Township

 

(A)  Construction and other related costs for clean and energy-efficient facilities

 

Project Allocation

10,000,000

(v)  North East Borough

 

(A)  Construction, infrastructure, acquisition and redevelopment costs related to the purchase and renovation of a historic building to house a Welch's Museum, Local Products Store, restaurant and visitors center. Project to also include improvements to adjacent Gibson Park, as well as pedestrian, vehicular, parking and other improvements

 

Project Allocation

1,500,000

(26)  Fayette County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(B)  Construction, site development and infrastructure for the development of a workforce development center

 

Project Allocation

5,000,000

(C)  Construction, infrastructure, redevelopment and related costs for the Joseph A. Hardy Connellsville Airport facilities

 

Project Allocation

1,000,000

(D)  Acquisition, construction, infrastructure, redevelopment and other costs related to a new hotel in the Connellsville area

 

Project Allocation

2,000,000

(E)  Acquisition, construction, renovation and other costs related to the establishment of year-round local markets

 

Project Allocation

1,500,000

(F)  Acquisition, construction, infrastructure and other costs related to a rural broadband project

 

Project Allocation

5,000,000

(ii)  City of Uniontown

 

(A)  Acquisition, renovation, infrastructure, construction and other costs related to Uniontown Hospital

 

Project Allocation

2,500,000

(B)  Acquisition, construction, redevelopment, infrastructure and other costs related to the Anchor Glass redevelopment project

 

Project Allocation

2,000,000

(C)  Acquisition, construction, renovation and other costs related to downtown commercial buildings

 

Project Allocation

2,000,000

(iii)  Borough of Brownsville

 

(A)  Acquisition, construction and other related costs for a senior citizens and childcare center

 

Project Allocation

250,000

(B)  Construction, redevelopment and other related costs for the Brownsville Tri-County Hospital

 

Project Allocation

1,000,000

(iv)  Connellsville Township

 

(A)  Land and building acquisition, construction, infrastructure and other related costs for downtown Connellsville revitalization

 

Project Allocation

1,000,000

(v)  Dunbar Township

 

(A)  Acquisition, construction, infrastructure, rehabilitation and other related costs for the Fayette County Emergency Operations and 911 Center at the Connellsville Airport site

 

Project Allocation

2,000,000

(vi)  North Union Township

 

(A)  Construction and other related costs for municipal and recreation center complex

 

Project Allocation

1,300,000

(B)  Acquisition, construction, redevelopment, infrastructure and other costs related to a career technical center

 

Project Allocation

5,000,000

(C)  Construction and other costs related to a new industrial park and buildings

 

Project Allocation

1,500,000

(vii)  South Connellsville Borough

 

(A)  Acquisition, construction, infrastructure, redevelopment and other related costs for the former Anchor Glass Container Corporation redevelopment project

 

Project Allocation

2,500,000

(viii)  South Union Township

 

(A)  Construction, infrastructure, redevelopment and other related costs for the Fayette County Business Park

 

Project Allocation

5,000,000

(ix)  Springhill Township

 

(A)  Construction, redevelopment, infrastructure and other costs related to the Springhill Business Park along the southern leg of the Mon-Fayette Expressway

 

Project Allocation

6,000,000

(27)  Forest County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(28)  Franklin County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(B)  Renovations, rehabilitation, construction and other related costs for redevelopment of the stadium, natatorium and tennis courts at James Buchanan High School

 

Project Allocation

500,000

(C)  Infrastructure, renovations, rehabilitation, construction and other related costs for improvements to a county-owned facility utilized as a recreational and therapeutic riding facility for persons with special needs

 

Project Allocation

500,000

(D)  Infrastructure, renovations, rehabilitation, construction and other related costs for improvements and to provide for future expansion to a Department of Emergency Services

 

Project Allocation

1,000,000

(E)  Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for the development of satellite offices and facilities for county human services and other agencies

 

Project Allocation

1,250,000

(F)  Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for the consolidation of all judicial functions into a new county judicial center

 

Project Allocation

15,000,000

(i.1)  Franklin County Area Development Corporation

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in Franklin County

 

Project Allocation

5,000,000

(ii)  Antrim Township

 

(A)  Construction, renovations and infrastructure improvements for an industrial facility

 

Project Allocation

2,000,000

(B)  Infrastructure, construction and other related costs associated with water, sewer and other infrastructure needs within a business park

 

Project Allocation

500,000

(C)  Infrastructure, construction and other related costs for the construction of a connector road within the Century Business Park linking Leitersburg Street and US Route 11 to facilitate economic development projects within the business par

 

Project Allocation

1,500,000

(iii)  Chambersburg Borough

 

(A)  Acquisition, construction and other related costs of a mixed-use hotel/commercial building in the downtown square bounded by Montgomery Alley, Central Avenue, Burhart Avenue and Black Avenue

 

Project Allocation

7,000,000

(B)  Acquisition and construction of a victim services facility for Women In Need, including infrastructure and other related costs

 

Project Allocation

5,000,000

(C)  Acquisition, infrastructure, construction and other related costs associated with an economic development project utilizing renewable and sustainable energy

 

Project Allocation

1,000,000

(iv)  Southampton Township

 

(A)  Construction, renovations and infrastructure improvements for an industrial facility

 

Project Allocation

2,000,000

(v)  Waynesboro Borough

 

(A)  Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for the development of public safety centers, including a fire station and a municipal police station

 

Project Allocation

1,000,000

(B)  Acquisition, infrastructure, redevelopment, construction and other related costs for an industrial tract of land to be developed into a commercial or industrial park

 

Project Allocation

2,000,000

(29)  Fulton County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(B)  Renovations, rehabilitation, construction and other related costs for the development of a Fulton County Medical Center and Patient Community Healthcare facility

 

Project Allocation

2,500,000

(30)  Greene County

 

(i)  County Project

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the count

 

Project Allocation

2,000,000

(B)  Acquisition, renovation, infrastructure, construction and other costs related to a county emergency operations center

 

Project Allocation

1,000,000

(C)  Acquisition, renovation, infrastructure, construction and other costs related to an Eco-Industrial Park

 

Project Allocation

2,000,000

(D)  Construction, infrastructure, redevelopment and related costs for the Upper Mon River Industrial Water Resource Management Project

 

Project Allocation

10,000,000

(ii)  Cumberland Township

 

(A)  Acquisition, renovation, infrastructure, construction and other costs related to development at Bailey's Crossroads

 

Project Allocation

1,000,000

(iii)  Franklin Township

 

(A)  Construction, infrastructure, redevelopment and other related costs for the EverGreene Technology Park Incubator

 

Project Allocation

2,000,000

(B)  Construction, infrastructure, redevelopment and other related costs for the Greene County Airport Business Park

 

Project Allocation

5,000,000

(C)  Acquisition, renovation, infrastructure, construction and other costs related to the Southwest Regional Medical Center

 

Project Allocation

2,000,000

(iv)  Perry Township

 

(A)  Acquisition, renovation, infrastructure, construction and other costs related to the Greene County Southern Gateway revitalization project

 

Project Allocation

5,000,000

(v)  Waynesburg Borough

 

(A)  Construction, infrastructure, redevelopment and other related costs for the renovation of the Paul R. Stewart Science Hall at Waynesburg University

 

Project Allocation

4,500,000

(B)  Acquisition, renovation, infrastructure, construction and other costs related to the Old County Office Building restoration project for a multi-use facility

 

Project Allocation

2,000,000

(C)  Acquisition, renovation, infrastructure, construction and other costs related to a transitional housing facility

 

Project Allocation

250,000

(31)  Huntingdon County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(B)  Acquisition and rehabilitation of the ROW, all historic landmark buildings and locomotives and equipment to operating capability for the East Broad Top Railroad

 

Project Allocation

33,000,000

(C)  Acquisition, infrastructure and other related costs for the development of a business park or corrections facility

 

Project Allocation

1,250,000

(ii)  Huntingdon Borough

 

(A)  Renovation of the Huntingdon County Library, including related costs

 

Project Allocation

4,000,000

(B)  Construction of a new addition to the Halbritter Center at Juniata College, including related costs

 

Project Allocation

6,000,000

(C)  Construction of a multipurpose,

multi-use conference and lodging center

on the campus of Juniata College,

including related costs

 

Project Allocation

8,000,000

(D)  Renovation of Brumbaugh Academic Center at Juniata College, including related costs

 

Project Allocation

10,000,000

(E)  Construction of an athletic field house on the campus of Juniata College, including related costs

 

Project Allocation

10,000,000

(F)  Construction of an addition to the Carnegie Museum of Art by Juniata College to add a modern conservatory and curatorial, including related costs

 

Project Allocation

5,000,000

(G)  Construction of a new natatorium complex for Juniata College, including related costs

 

Project Allocation

6,000,000

(H)  Acquisition, infrastructure, renovations, redevelopment and other related costs for the revitalization of an abandoned industrial site for future development

 

Project Allocation

1,500,000

(I)  Acquisition, renovations, rehabilitation, construction and other related costs for the expansion of the J.C. Blair Memorial Hospital

 

Project Allocation

3,000,000

(iii)  Mount Union Borough

 

(A)  Renovations, rehabilitation and construction of the Pennsylvania Avenue Linear Park

 

Project Allocation

1,250,000

(iv)  Smithfield Township

 

(A)  Acquisition, infrastructure, redevelopment and construction of shell buildings on all former STEDCO properties

 

Project Allocation

2,000,000

(32)  Indiana County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(B)  Acquisition, engineering, site preparation, infrastructure, construction and other related costs for the development of a disaster response center

 

Project Allocation

3,000,000

(C)  Acquisition, engineering, infrastructure, equipment, construction and other related costs for the replacement and upgrade to the county emergency services communications network

 

Project Allocation

5,000,000

(i.1)  Indiana County Development Corporation

 

(A)  Acquisition, engineering, site preparation, infrastructure, construction and other related costs for the development of a new business site within the county

 

Project Allocation

2,000,000

(B)  Acquisition, engineering, site preparation, infrastructure, construction and other related costs for the development of a new industrial multitenant building in Center Township

 

Project Allocation

3,000,000

(C)  Acquisition, engineering, site preparation, infrastructure, construction and other related costs for Phase II of the development of a business/industrial park located in White Township

 

Project Allocation

4,000,000

(i.2)  Blairsville Borough

(A)  Acquisition, demolition, infrastructure, redevelopment, construction and other related costs, including the abatement of hazardous materials for the Blairsville infill housing project

 

Project Allocation

3,000,000

(ii)  Indiana Township

 

(A)  Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for the Indiana Township Town Hall and Community Center

 

Project Allocation

1,000,000

(iii)  White Township

 

(A)  Renovation, rehabilitation, construction and other related costs for expansion of the Indiana Regional Medical Center, including the construction of a new operating room theatre, ambulatory care unit and intensive care unit

 

Project Allocation

10,000,000

(iv)  Indiana Borough and White Township

 

(A)  Acquisition, infrastructure, construction and other related costs for development of the Indiana University of Pennsylvania hotel project

 

Project Allocation

5,000,000

(33)  Jefferson County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(ii)  Jefferson County Development Council

 

(A)  Infrastructure, redevelopment, construction and other related costs for the redevelopment of a former strip- mined property into a business park

 

Project Allocation

2,000,000

(B)  Acquisition, construction and infrastructure improvements for the development of a business park to support economic opportunities along the Interstate 80 Corridor

 

Project Allocation

10,000,000

(C)  Construction, redevelopment and other related costs for the Syncarpha solar project which includes the creation of a five-megawatt solar power plant

 

Project Allocation

10,000,000

(ii.1)  Brockway Borough

 

(A)  Acquisition, construction and infrastructure improvements and other related costs for the improvement and continued development of a Brockway business district

 

Project Allocation

7,000,000

(iii)  Brookville Borough

 

(A)  Renovations, rehabilitation and other related costs for upgrades to the Brookville Hospital's Emergency Services Department and patient rooms

 

Project Allocation

750,000

(B)  Infrastructure, construction and other related costs for the expansion of the Brookville Hospital, including the addition of outpatient diagnostic and therapeutic services, surgery, emergency department, parking and utility upgrades

 

Project Allocation

12,000,000

(iv)  Snyder Township

 

(A)  Acquisition, infrastructure, redevelopment, renovations and rehabilitation of a building for the development of an educational facility for training purposes

 

Project Allocation

12,000,000

(34)  Juniata County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(B)  Land acquisition, infrastructure improvements and construction necessary to maintain the competitive position of an existing business entity or for the development of business-ready sites for potential business tenants

 

Project Allocatio

2,000,000

(35)  Lackawanna County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

5,000,000

(B)  Construction, infrastructure and other costs related to the Valley View Business Park interchange

 

Project Allocation

8,000,000

(C)  Construction, infrastructure and other costs related to the Valley View Business Park Industrial Facility

 

Project Allocation

5,000,000

(D)  Construction, infrastructure and other costs related to the Carbondale Rail Yard Transload Facility

 

Project Allocation

2,728,000

(ii)  City of Scranton

 

(A)  Acquisition, construction, infrastructure and other related costs for an athletic field complex at Lackawanna College

 

Project Allocation

7,000,000

(B)  Construction, infrastructure and other related costs for renovations to the Allied Services Skilled Nursing Center

 

Project Allocation

1,000,000

(C)  Construction, renovation, infrastructure and other related costs for the Knowledge Commons at Marywood University

 

Project Allocation

12,500,000

(D)  Construction, infrastructure, renovation and other costs related to the Mount Pleasant Corporate Center Office Building

 

Project Allocation

3,000,000

(iii)  Archbald Borough

 

(A)  Construction, renovation, infrastructure and other costs related to Archbald Route 6 Industrial Facility

 

Project Allocation

2,000,000

(iv)  Carbondale Township

 

(A)  Acquisition, renovation, infrastructure, construction and other costs related to the Carbondale Technology Transfer Center Clifford of Vermont Building

 

Project Allocation

1,400,000

(v)  Jermyn Borough

 

(A)  Acquisition, renovation, infrastructure, construction and other costs related to the Wright Center for Primary Care

 

Project Allocation

2,500,000

(vi)  La Plume Township

 

(A)  Construction, infrastructure, renovation and other costs related to Keystone College Miller Library upgrade and wellness center

 

Project Allocation

2,500,000

(vii)  Moscow Borough

 

(A)  Construction, infrastructure and other related costs to revitalize the Main Street downtown district

 

Project Allocation

500,000

(B)  Construction of the new North Pocono Public Library, including related costs

 

Project Allocation

2,500,000

(viii)  Scott Township

 

(A)  Construction, infrastructure and other related costs for an addition to the Lakeland High School

 

Project Allocation

2,000,000

(B)  Construction, infrastructure and other costs related to Scott Technology Park Industrial Facility

 

Project Allocation

3,000,000

(ix)  South Abington Township

 

(A)  Acquisition, construction, infrastructure and other related costs for the Kempton Athletic Center

 

Project Allocation

4,012,000

(x)  Spring Brook Township

 

(A)  Construction, infrastructure, renovation and other costs related to the University of Scranton Spring Brook Athletic Complex

 

Project Allocation

10,000,000

(36)  Lancaster County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

5,000,000

(B)  Acquisition, clearing, demolition, renovation, environmental remediation, construction, infrastructure, streets, utilities and other costs associated with the Lancaster Northwest Gateway Project, including construction of health care and college facilities

 

Project Allocation

20,000,000

(C)  Infrastructure, construction and other related costs for the development of the Keystone Solar project, including landscape buffers and solar panels

 

Project Allocation

6,000,000

(D)  Acquisition, renovations, rehabilitation, equipment and other related costs for a school for children with complex learning disabilities

 

Project Allocation

1,000,000

(E)  Construction and development of an agricultural support facility, including related infrastructure costs

 

Project Allocation

15,000,000

(F)  Land acquisition, new construction, renovations and rehabilitation of two existing historic structures and other costs related to the proposed Lancaster Urban Forest Center

 

Project Allocation

8,000,000

(G)  Acquisition, renovations, rehabilitation, construction and other related costs for housing replacement for individuals with mental disabilities

 

Project Allocation

500,000

(i.1)  Lancaster County Redevelopment Authority

 

(A)  Demolition of structures, infrastructure, roadway and utility improvements, construction, streetscape enhancements and other related costs for the redevelopment of the Harrisburg Avenue retail and educational corridor

 

Project Allocation

3,000,000

(ii)  City of Lancaster

 

(A)  Construction and other related costs of a commercial/retail development at College Hill at North Charlotte Street and Harrisburg Pike

 

Project Allocation

2,500,000

(B)  Construction, infrastructure, redevelopment and other related costs for a neighborhood recreation and revitalization project

 

Project Allocation

2,000,000

(C)  Construction, infrastructure, redevelopment and other related costs for an economic development project near the Lancaster County Convention Center

 

Project Allocation

10,000,000

(D)  Construction, infrastructure, redevelopment and other related costs for the Manor Street Corridor economic development project

 

Project Allocation

10,000,000

(E)  Construction, infrastructure and other related costs to redevelop the Lancaster Press building and construct a parking garage

 

Project Allocation

6,000,000

(F)  Acquisition, construction, infrastructure and other related costs for the Lancaster Square redevelopment project

 

Project Allocation

15,000,000

(G)  Construction, infrastructure and other related costs for the Market District redevelopment project

 

Project Allocation

4,000,000

(H)  Construction, infrastructure, redevelopment and other related costs for the Conestoga River Plaza economic development project

 

Project Allocation

7,500,000

(I)  Construction, infrastructure and other related costs for the Lancaster General Hospital Energy Center redevelopment project

 

Project Allocation

3,000,000

(J)  Construction, infrastructure and other related costs for the Lancaster General Health Cancer Center expansion project

 

Project Allocation

5,000,000

(K)  Acquisition, construction, infrastructure, redevelopment and other related costs for a community work force training facility

 

Project Allocation

1,000,000

(L)  Construction, infrastructure, redevelopment and other related costs for the Lancaster City Hall renovation and expansion project

 

Project Allocation

4,500,000

(M)  Construction, infrastructure, redevelopment and other related costs for the Arbor Place Community Center

 

Project Allocation

1,700,000

(iii)  Ephrata Borough

 

(A)  Acquisition, construction, infrastructure, redevelopment and other related costs for facilities to deliver medical services, conduct research or provide other related activities for Ephrata Community Hospital

 

Project Allocation

15,000,000

(B)  Construction and renovation of the Ephrata Community Hospital to expand the emergency department

 

Project Allocation

1,000,000

(iv)  Lancaster Township

 

(A)  Construction and other related costs for the Lancaster campus of history project

 

Project Allocation

7,000,000

(v)  Manheim Borough

 

(A)  Construction, acquisition and redevelopment of a regional library to serve the Manheim Central Region

 

Project Allocation

1,000,000

(37)  Lawrence County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(B)  Acquisition, construction, renovations, rehabilitation, infrastructure and other related costs for the construction of a high-tech LED lighting manufacturing facility

 

Project Allocation

5,000,000

(i.1)  Lawrence County Economic Development Corporation

 

(A)  Acquisition, demolition, site improvements, construction, renovations, rehabilitation, infrastructure and other related costs for the redevelopment of a site for heavy industrial use

 

Project Allocation

2,500,000

(B)  Acquisition, infrastructure, construction, renovations, rehabilitation and other related costs for the redevelopment of the Volant Mill and adjacent properties

 

Project Allocation

2,500,000

(C)  Acquisition, demolition, site improvements, construction, renovations, rehabilitation, infrastructure and other related costs for the redevelopment of properties along Sampson Street into sites for use by light to heavy industrial enterprises

 

Project Allocation

5,000,000

(D)  Acquisition, infrastructure, construction, renovations, rehabilitation and other related costs for the revitalization of the Route 18 Industrial Corridor

 

Project Allocation

10,000,000

(i.2)  City of New Castle

 

(A)  Infrastructure, renovations, rehabilitation and construction, including the abatement of hazardous materials for facility and technology upgrades to the Jameson Memorial Hospital

 

Project Allocation

5,500,000

(ii)  Borough of Ellwood City

 

(A)  Construction, infrastructure, redevelopment and other related costs for Ellwood City Hospital renovations

 

Project Allocation

250,000

(B)  Construction, infrastructure, acquisition and other related costs for the redevelopment of the downtown corridor

 

Project Allocation

2,000,000

(C)  Construction, infrastructure, acquisition and other related costs for the Ellwood City Enterprise Park project

 

Project Allocation

10,000,000

(D)  Construction, infrastructure, acquisition and other related costs for a hotel project

 

Project Allocation

4,000,000

(iii)  Borough of New Wilmington

 

(A)  Renovation of the Hoyt Science Center at Westminster College, including construction, infrastructure and other related costs

 

Project Allocation

10,000,000

(B)  Infrastructure, renovations, rehabilitation and construction for upgrades to the Hoyt Science Center

 

Project Allocation

10,000,000

(iv)  Ellport Borough

 

(A)  Acquisition, construction, infrastructure, redevelopment and other related costs for the Ellport area industrial revitalization project

 

Project Allocation

1,000,000

(v)  Taylor Township

 

(A)  Construction, infrastructure, redevelopment and other related costs for an industrial redevelopment project

 

Project Allocation

2,000,000

(vi)  Wilmington Township

 

(A)  Acquisition, construction and other related costs for economic development projects for the Wilmington Township Route 18 Corridor revitalization

 

Project Allocation

10,000,000

(38)  Lebanon County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(i.1)  East Hanover Township

 

(A)  Acquisition, infrastructure, renovations, rehabilitation, equipment and other related costs for a traditional Amish market and expo center

 

Project Allocation

7,300,000

(B)  Acquisition, infrastructure, renovations, rehabilitation and other related costs for the relocation, preservation and restoration of the historic Star Barn and the development of surrounding buildings at new site location

 

Project Allocation

10,000,000

(ii)  South Lebanon Township

 

(A)  Construction, infrastructure and other redevelopment costs associated with a police department expansion project

 

Project Allocation

4,000,000

(iii)  West Cornwall Township

 

(A)  Infrastructure, renovations, rehabilitation, construction and other related costs for the Philhaven mental health facility, including energy efficiency upgrades and patient transportation

 

Project Allocation

1,000,000

(39)  Lehigh County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

5,000,000

(B)  Construction, renovations and infrastructure improvements for an industrial facility

 

Project Allocation

5,000,000

(C)  Construction of a science/technology and educational aerospace theme park network designed to foster business partnerships for the development of an industrial park and tourism at a Lehigh Valley International Airport facility, including acquisition, infrastructure and other related costs

 

Project Allocation

5,000,000

(D)  Acquisition, construction, infrastructure and other related costs for Lehigh Valley sports facility

 

Project Allocation

7,000,000

(E)  Infrastructure, renovations, rehabilitation, construction and other related costs for tenant improvements and upgrades for a headquarters in Saucon Valley Plaza

 

Project Allocation

3,000,000

(ii)  City of Allentown

 

(A)  Infrastructure, construction and other related costs for a waste-to-energy facility

 

Project Allocation

2,000,000

(B)  Acquisition, construction and infrastructure for Haven House, including related costs

 

Project Allocation

1,250,000

(C)  Construction of a veterans' sanctuary, a division of Treatment Trends, Inc., to provide treatment for addiction and co-occurring symptoms for veterans

 

Project Allocation

1,000,000

(D)  Acquisition, construction, infrastructure and other related costs for the Good Shepherd Comprehensive Continuing Care Hospital

 

Project Allocation

30,000,000

(E)  Capital improvements and stage reconstruction for Allentown Symphony Hall, including construction and other related costs

 

Project Allocation

500,000

(F)  Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs to redevelop a former industrial site near Coca-Cola Park

 

Project Allocation

10,000,000

(G)  Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment and other related costs for an infant-toddler and family center at the Donley Children's Campus

 

Project Allocation

2,500,000

(H)  Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for the redevelopment of the former Neuweiler Brewery

 

Project Allocation

10,000,000

(I)  Acquisition, construction, infrastructure, redevelopment and other related costs for the Allentown Symphony Hall

 

Project Allocation

5,000,000

(J)  Acquisition, construction, infrastructure and other related costs to redevelop properties on North 7th Street, north of Linden Street, and surrounding areas

 

Project Allocation

5,000,000

(K)  Acquisition, construction, infrastructure and other related costs to redevelop properties in the 1st and 6th Wards along the Lehigh River

 

Project Allocation

15,000,000

(L)  Acquisition, construction, infrastructure, redevelopment and other related costs for a mixed-use commercial and residential community in Old Allentown

 

Project Allocation

5,000,000

(M)  Acquisition, construction, infrastructure and other related costs for an educational and student building at Muhlenberg College

 

Project Allocation

1,500,000

(N)  Construction, redevelopment and other related costs to relocate and expand the Lehigh Valley Health Network's Outpatient Pediatric Clinic at 17th and Chew Streets

 

Project Allocation

700,000

(O)  Acquisition, construction, infrastructure, redevelopment and other related costs for the development of a mixed-use commercial and residential community in Jordan Heights

 

Project Allocation

5,000,000

(P)  Acquisition, construction, infrastructure and other related costs to redevelop properties on South Hall Street

 

Project Allocation

1,000,000

(Q)  Acquisition, construction, infrastructure and other related costs to redevelop properties on North 7th Street, south of Linden Street, and surrounding areas

 

Project Allocation

5,000,000

(R)  Acquisition, construction, infrastructure and other related costs to redevelop the Americus Hotel

 

Project Allocation

10,000,000

(S)  Acquisition, construction, infrastructure and other related costs to redevelop the area along the 900 block of Hamilton Street

 

Project Allocation

2,500,000

(T)  Acquisition, construction, infrastructure and other related costs to redevelop the area along the 800 block of Hamilton Street

 

Project Allocation

2,500,000

(U)  Acquisition, construction, infrastructure and other related costs to redevelop the area along the 700 block of Hamilton Street

 

Project Allocation

2,500,000

(V)  Acquisition, construction, infrastructure and other related costs to redevelop the area along the 600 block of Hamilton Street

 

Project Allocation

2,500,000

(W)  Acquisition, construction, infrastructure and other related costs to redevelop the area along the 500 block of Hamilton Street

 

Project Allocation

2,500,000

(X)  Construction, infrastructure and other related costs for the development of an educational space and other commercial enterprises

 

Project Allocation

2,500,000

(Y)  Acquisition and construction of The Hill's import site, including related costs

 

Project Allocation

2,000,000

(Z)  Construction and redevelopment costs for the 8th Street housing redevelopment project in the City of Allentown

 

Project Allocation

2,000,000

(AA)  Rehabilitation, construction and other costs related to renovations and redevelopment of Cumberland Gardens, including grading, infrastructure and facade improvements

 

Project Allocation

1,500,000

(BB)  Rehabilitation, construction and other costs related to renovations of a performing arts center on North 6th Street, including stage reconstruction and patron area renovations

 

Project Allocation

750,000

(CC)  Infrastructure, construction and other costs related to the development of an International Culinary Arts educational facility on 7th Street

 

Project Allocation

1,500,000

(DD)  Acquisition, renovation, rehabilitation, construction and other costs related to the redevelopment of the 700 block of Hamilton Street

 

Project Allocation

2,500,000

(EE)  Acquisition, renovation, rehabilitation, construction and other costs related to the redevelopment of the 600 block of Hamilton Street

 

Project Allocation

2,500,000

(FF)  Acquisition, renovation, rehabilitation, construction and other costs related to the redevelopment of the 500 block of Hamilton Street

 

Project Allocation

2,500,000

(GG)  Infrastructure, construction and other costs related to improvements and expansion of the Community Services for Children facility, including the construction of a center for abused babies

 

Project Allocation

2,500,000

(HH)  Acquisition, renovation, rehabilitation, construction and other costs related to the redevelopment of the 800 block of Hamilton Street

 

Project Allocation

4,000,000

(II)  Acquisition, renovation, rehabilitation, construction and other costs related to the redevelopment of North 7th Street, south of Linden Street, for a multi-use development

 

Project Allocation

10,000,000

(JJ)  Acquisition, renovation, rehabilitation, construction and other costs related to the redevelopment of North 7th Street, north of Linden Street, for a multi-use development

 

Project Allocation

10,000,000

(KK)  Infrastructure, renovations, rehabilitation and other related costs for the demolition and remediation of the Allentown State Hospital property

 

Project Allocation

5,000,000

(LL)  Acquisition, renovations and other costs related to the rehabilitation of a building on the 600 and 700 blocks of Hamilton Street for the creation of a College Access Network center which will house a dual enrollment program with the Allentown School District, community college and State System university partners

 

Project Allocation

7,000,000

(iii)  City of Bethlehem

 

(A)  Construction, infrastructure, redevelopment and other related costs to renovate and expand the Emergency Department at Lehigh Valley Health Network - Muhlenberg Hospital

 

Project Allocation

2,000,000

(B)  Acquisition, renovation, infrastructure, construction and other costs related to the Lehigh Valley Charter High School for the Performing Arts

 

Project Allocation

5,000,000

(iv)  Catasauqua Borough

 

(A)  Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for the redevelopment of a former industrial site

 

Project Allocation

10,000,000

(iv.1)  Coplay Borough

 

(A)  Acquisition, construction, infrastructure and other related costs for a building to house municipal streets and sanitation departments and a recreational facility

 

Project Allocation

350,000

(B)  Construction, renovation, infrastructure and other related costs for rehabilitation of the municipal building

 

Project Allocation

920,000

(C)  Construction, renovation, infrastructure and other related costs for rehabilitation of the fire department building

 

Project Allocation

250,000

(v)  Emmaus Borough

 

(A)  Acquisition and renovation of a facility to house the Emmaus Historical Society, including construction, infrastructure, redevelopment and other related costs

 

Project Allocation

1,500,000

(B)  Acquisition of property to house the Emmaus Main Street Program offices and other facilities, including redevelopment, infrastructure and other related costs

 

Project Allocation

500,000

(vi)  Fountain Hill Borough

 

(A)  Construction, infrastructure, abatement of hazardous materials, redevelopment and other related costs for The Medical School of Temple University/St. Luke's Hospital and Health Network

 

Project Allocation

10,000,000

(vii)  Lower Macungie Township

 

(A)  Renovation of existing facilities and construction of new amenities at Camp Olympic, including related costs

 

Project Allocation

601,000

(B)  Acquisition and construction for the Intermunicipal Green Belt Improvement Program, including related costs

 

Project Allocation

625,000

(C)  Acquisition, construction, infrastructure and other related costs for the Hamilton Crossings project

 

Project Allocation

10,000,000

(viii)  Lynn Township

 

(A)  Redevelopment of the Ontelaunee Park, including acquisition, construction, infrastructure, abatement of hazardous materials and other related costs

 

Project Allocation

500,000

(ix)  North Whitehall Township

 

(A)  Construction of a veterinary technology lab and veterinary clinic at Lehigh Carbon Community College in conjunction with the Lehigh Valley Zoo

 

Project Allocation

1,250,000

(B)  Construction of a Communiversity Center at Lehigh Carbon Community College, including related costs

 

Project Allocation

650,000

(C)  Construction, infrastructure and redevelopment costs associated with expansion and building of new exhibit space for the Lehigh Valley Zoo

 

Project Allocation

950,000

(D)  Construction, renovations, rehabilitation, equipment and other related costs for a new kitchen in the KidsPeace Donley Therapeutic Education Center

 

Project Allocation

300,000

(E)  Construction and redevelopment of a new health center on the Luther Crest campus

 

Project Allocation

2,500,000

(x)  Salisbury Township

 

(A)  Acquisition and construction of a youth recreation and gym facility for the Salisbury Youth Association, including related costs

 

Project Allocation

500,000

(B)  Construction of an addition to and renovation of Salisbury Township police facility, including abatement of hazardous materials, infrastructure and other related costs

 

Project Allocation

1,000,000

(x.1)  South Whitehall Township

 

(A)  Construction and redevelopment of a new Health Center on the Luther Crest campus

 

Project Allocation

2,500,000

(B)  Infrastructure, construction and other related costs for the expansion of the Da Vinci Science Center

 

Project Allocation

950,000

(xi)  Upper Macungie Township

 

(A)  Construction of a municipal police station, including related costs

 

Project Allocation

1,000,000

(B)  Redevelopment of commercial property, including necessary costs

 

Project Allocation

1,000,000

(xii)  Upper Saucon Township

 

(A)  Infrastructure for Lutron Electronics business park, including related costs

 

Project Allocation

750,000

(B)  Construction, renovations and infrastructure improvements for an office facility

 

Project Allocation

10,000,000

(xiii)  Weisenberg Township

 

(A)  Construction of a community center for use by multiple municipalities, including necessary costs

 

Project Allocation

2,200,000

(xiv)  Whitehall Township

 

(A)  Construction, renovation and other costs related to the Lafarge-Coplay Natural Gas Line Extension and Plant upgrades project

 

Project Allocation

300,000

(xv)  Alburtis and Coplay Borough

 

(A)  Construction, infrastructure and redevelopment costs associated with the restoration of the Lock Ridge Furnace Museum and Kilns

 

Project Allocation

1,500,000

(xvi)  Emmaus and Lower Macungie Boroughs

 

(A)  Acquisition and development costs for a mixed-use development that includes a business incubator and commercial retail, residential and environmental education uses

 

Project Allocation

1,250,000

(40)  Luzerne County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

5,000,000

(B)  Construction, renovation, infrastructure and other related costs for the Luzerne County Community College Main Campus in Nanticoke

 

Project Allocation

5,199,000

(C)  Construction, renovation, infrastructure and other related costs for the Luzerne County Community College Public Safety Training Institute

 

Project Allocation

2,500,000

(D)  Construction, renovation, infrastructure and other related costs for the Luzerne County Community College Health Sciences Center

 

Project Allocation

400,000

(E)  Construction, renovations and infrastructure improvements for an industrial facility

 

Project Allocation

1,000,000

(F)  Acquisition, site preparation, renovation, demolition, construction, infrastructure and other related costs for the expansion of the Weinberg Northeast Pennsylvania Regional Food Bank

 

Project Allocation

1,500,000

(G)  Acquisition, renovation, rehabilitation, construction and other costs related to the construction and development of a Luzerne County Biomedical Research Institute

 

Project Allocation

10,000,000

(H)  Acquisition, infrastructure, renovations, construction, including the abatement of hazardous materials, and other costs related to the rehabilitation and retrofit of existing structures and new construction at the Lands at Hillside Farms

 

Project Allocation

4,000,000

(ii)  City of Hazleton

 

(A)  Construction, infrastructure and other related costs for Hazleton Area Public Library renovations

 

Project Allocation

1,000,000

(B)  Construction, redevelopment, abatement of hazardous materials and other related costs for the Serento Gardens project

 

Project Allocation

750,000

(C)  Construction, infrastructure and other costs related to the Intermodal Facility, Phase II

 

Project Allocation

9,500,000

(ii.1)  City of Nanticoke

 

(A)  Acquisition, demolition, construction and other related costs to downtown City  of Nanticoke redevelopment

 

Project Allocation

1,000,000

(B)  Acquisition, demolition, construction and other related costs for a new regional municipal service building

 

Project Allocation

500,000

(C)  Acquisition, demolition, construction and other related costs for the South Valley Parkway

 

Project Allocation

20,000,000

(D)  Construction, redevelopment and other related costs for Lower Broadway Park improvements

 

Project Allocation

500,000

(E)  Acquisition, demolition, construction and other related costs for Market Street Redevelopment project

 

Project Allocation

2,000,000

(iii)  City of Wilkes-Barre

 

(A)  Acquisition, construction and other related costs for an indoor recreational facility at King's College

 

Project Allocation

3,000,000

(B)  Construction and other related costs for the redevelopment of the former Sterling Hotel property in downtown Wilkes-Barre

 

Project Allocation

10,000,000

(C)  Acquisition, construction, infrastructure and other related costs for Kinship Square adjacent to Kings College

 

Project Allocation

10,000,000

(D)  Improvement and renovations to the Jewish Community Center

 

Project Allocation

2,000,000

(iv)  Ashley Borough

 

(A)  Acquisition, demolition, construction and other related costs to redevelop 56 Main Street

 

Project Allocation

500,000

(B)  Construction, infrastructure and other related costs for a new borough building

 

Project Allocation

2,750,000

(C)  Acquisition, construction, infrastructure and other related costs for the Huber Breaker Preservation Society Park

 

Project Allocation

500,000

(D)  Construction, abatement of hazardous materials and other related costs to redevelop the Q-Stick property

 

Project Allocation

1,000,000

(E)  Construction, redevelopment and other related costs for Conyngham Street Park improvements

 

Project Allocation

500,000

(F)  Acquisition, demolition, construction and other related costs to redevelop 61-63 Main Street

 

Project Allocation

1,000,000

(G)  Acquisition, demolition and other related costs to redevelop the area along 65-71 Mary Street

 

Project Allocation

500,000

(H)  Acquisition, demolition, construction and other related costs for the Main Street renovation project

 

Project Allocation

1,000,000

(I)  Acquisition, construction and other related costs to redevelop the Carosel Printing building

 

Project Allocation

500,000

(J)  Acquisition, demolition, construction and other related costs to redevelop 122 Main Street

 

Project Allocation

500,000

(K)  Acquisition, demolition, construction and other related costs to redevelop property at 23 High Street

 

Project Allocation

500,000

(L)  Acquisition, construction and other related costs to redevelop the former Sony site

 

Project Allocation

500,000

(M)  Acquisition, demolition, construction and other related costs to redevelop 44-46 Fall Street

 

Project Allocation

500,000

(N)  Acquisition, demolition, construction and other related costs to redevelop 48 Fall Street

 

Project Allocation

500,000

(v)  Dallas Borough

 

(A)  Construction and other related costs for the redevelopment of an abandoned historic former school house on Church Street

 

Project Allocation

5,000,000

(B)  Infrastructure, renovations, rehabilitation, construction and other related costs for a multiphase renovation, expansion and equipment upgrade to the Anderson Sports and Health Center and surrounding athletic venues

 

Project Allocation

600,000

(v.1)  Dallas Township

 

(A)  Construction, infrastructure and other related costs for a teacher education center

 

Project Allocation

5,000,000

(v.2)  Foster Township

 

(A)  Construction, renovation, infrastructure and other related costs for MMI Preparatory School Library and Learning Center

 

Project Allocation

1,000,000

(v.3)  Hanover Township

 

(A)  Construction, renovations and infrastructure improvements for the Truesdale Terrace and Witinski Villa

 

Project Allocation

1,000,000

(vi)  Jenkins Township

 

(A)  Construction, renovations and infrastructure improvements for an industrial facility

 

Project Allocation

1,000,000

(B)  Construction, infrastructure, remediation and other related costs for the redevelopment of the former Techneglas facility near Pittston

 

Project Allocation

5,000,000

(vi.1)  Kingston Borough

 

(A)  Acquisition, renovations, construction and other costs related to the redevelopment of a former retail location on 3rd Avenue to create a new multi-use development

 

Project Allocation

2,000,000

(vi.2)  Newport Township

 

(A)  Construction, infrastructure and other related costs for the Whitney Pointe Industrial/Commercial Park

 

Project Allocation

2,000,000

(vi.3)  Pittston Township

 

(A)  Construction, infrastructure, renovation and other costs related to Ready Rubber facility

 

Project Allocation

1,000,000

(B)  Construction, infrastructure, redevelopment and other costs related to the TJX Solar photovoltaic project

 

Project Allocation

1,500,000

(vii)  Plains Township

 

(A)  Acquisition, demolition, construction and other related costs to redevelop properties along South River and Maffett Streets

 

Project Allocation

500,000

(B)  Acquisition, demolition, construction and other related costs to redevelop properties along Main and Carey Streets

 

Project Allocation

800,000

(C)  Construction and other related costs to expand, remodel and upgrade the township's police department

 

Project Allocation

800,000

(vii.1)  Plymouth Borough

 

(A)  Acquisition, demolition, construction and other related costs to downtown Plymouth Borough redevelopment

 

Project Allocation

1,000,000

(B)  Construction, renovations and infrastructure improvements for the Wyoming Valley West School District Community Center

 

Project Allocation

1,000,000

(viii)  West Pittston Borough

 

(A)  Acquisition, construction, infrastructure and other related costs to build the new West Pittston Library

 

Project Allocation

2,000,000

(ix)  White Haven Borough

 

(A)  Construction, acquisition, infrastructure, abatement of hazardous materials and other related costs for the White Haven Community and Office Building project

 

Project Allocation

500,000

(x)  Wilkes-Barre Township

 

(A)  Construction, infrastructure and other related costs for a new municipal building

 

Project Allocation

500,000

(41)  Lycoming County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(B)  Infrastructure, rehabilitation, construction and other related costs for the replacement and upgrade of county communications towers

 

Project Allocation

500,000

(C)  Infrastructure, construction and other related costs for the retrofit of the YWCA, including the development of housing for transitional living quarters for victims of domestic violence and medical college students

 

Project Allocation

1,000,000

(ii)  City of Williamsport

 

(A)  Construction, infrastructure and other related costs for the Susquehanna Health medical office building

 

Project Allocation

7,500,000

(B)  Construction, infrastructure, redevelopment and other related costs to build a community center

 

Project Allocation

5,000,000

(C)  Construction and other related costs to replace the Lycoming Engines warehouse

 

Project Allocation

2,280,000

(D)  Acquisition, construction, infrastructure, redevelopment and other related costs for the Eureka Place development project

 

Project Allocation

7,000,000

(E)  Construction, acquisition, infrastructure and other related costs to redevelop the William Street area

 

Project Allocation

2,500,000

(iii)  Muncy Township

 

(A)  Construction costs related to the expansion of the Eastern Lycoming Branch YMCA to accommodate an increase in membership and the large amount of member usage of the facility

 

Project Allocation

2,000,000

(42)  McKean County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(ii)  McKean County Industrial Development Authority

 

(A)  Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for the development of facilities to be utilized for education, training and economic development, including the development of a multitenant facility

 

Project Allocation

10,000,000

(B)  Infrastructure, construction and other costs related to the development of an industrial/business park and a multitenant facility located on Bradford Regional Airport Authority property

 

Project Allocation

2,000,000

(iii)  City of Bradford

 

(A)  Acquisition, infrastructure, renovations, rehabilitation, construction and other costs related to the downtown Bradford Improvement Project, including waterfront development, walkways, boardwalk and new streetscape amenities

 

Project Allocation

5,000,000

(B)  Acquisition, infrastructure, renovations, rehabilitation, construction and other costs related to the Impact Bradford II - Community Improvement Project, including gateway improvements, demolition, storm water management for flood control and other community improvements for economic development

 

Project Allocation

10,000,000

(iv)  Foster Township

 

(A)  Construction, infrastructure and other related redevelopment costs associated with improvements to the Lafferty Hollow Industrial Park

 

Project Allocation

2,500,000

(B)  Acquisition, demolition, infrastructure, renovations, rehabilitation, equipment, construction and other related costs for the redevelopment of the Bradford Mall site

 

Project Allocation

5,000,000

(43)  Mercer County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(B)  Reynolds East Business Park, Phase II development costs, including infrastructure improvements, utility extensions and roadways

 

Project Allocation

500,000

(C)  Reynolds East Business Park, construction of a modern multitenant building

 

Project Allocation

1,000,000

(ii)  City of Hermitage

 

(A)  Construction and other related costs for the development of an IT facility in the LindenPointe Planned Technical Park

 

Project Allocation

1,250,000

(B)  Construction of a facility creating employment opportunities in science, technology, engineering and math-based industries in the LindenPointe planned technical park

 

Project Allocation

3,000,000

(iii)  City of Sharon

 

(A)  Expansion of the Sharon Regional Medical Center, including construction of a parking garage

 

Project Allocation

10,000,000

(B)  Acquisition, construction, infrastructure, redevelopment and other related costs for an urban neighborhood revitalization project near the campus of the Sharon Regional Health System

 

Project Allocation

10,000,000

(C)  Infrastructure, renovations, rehabilitation and construction costs for the replacement of rooftop air handling units at Sharon Regional Health System

 

Project Allocation

800,000

(D)  Renovations, rehabilitation, construction and equipment acquisition for a new catheterization laboratory within the Sharon Regional Health System

 

Project Allocation

900,000

(E)  Renovations, rehabilitation, construction and related costs for an Emergency Department Entrance lobby expansion project at the Sharon Regional Health System

 

Project Allocation

1,000,000

(F)  Renovations, rehabilitation, construction and related costs for the Sharon Regional Health System's State Street Business Office expansion project

 

Project Allocation

1,000,000

(iv)  Jackson Township

 

(A)  Acquisition, infrastructure, construction and other related costs for mixed-use development in Mercer County

 

Project Allocation

4,000,000

(B)  Acquisition, infrastructure, construction and other related costs for mixed-use development in Mercer County

 

Project Allocation

4,000,000

(v)  Pymatuning Township

 

(A)  Reynolds Industrial Park, renovations and rehabilitation of buildings, including HVAC improvements and roof replacements

 

Project Allocation

500,000

(44)  Mifflin County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(B)  Land acquisition, infrastructure improvements, construction and other related costs necessary to maintain the competitive position of an existing business entity or for the development of business-ready sites for potential business tenants

 

Project Allocation

2,000,000

(ii)  Mifflin County Industrial Development Authority

 

(A)  Infrastructure, renovations, rehabilitation, construction and other related costs for improvements to and expansion of the Malta Home Development

 

Project Allocation

1,000,000

(B)  Infrastructure, renovations, rehabilitation, equipment, construction and other related costs for a new GE Inspection Technologies technical training center to be located in the Mifflin County Industrial Park

 

Project Allocation

1,000,000

(C)  Acquisition, infrastructure, renovations, rehabilitation, equipment, construction and other related costs, including the abatement of hazardous materials, for the expansion of and improvements to the Trinity Packaging Corporation's manufacturing complex located within the Mifflin County Industrial Park

 

Project Allocation

2,000,000

(D)  Infrastructure, rehabilitation, construction and other related costs for Mifflin County Industrial Park Utility Extensions project, to include, but not be limited to, electric and natural gas to expanding and new companies

 

Project Allocation

4,000,000

(E)  Infrastructure, rehabilitation, construction and other related costs for Phase II of planned improvements at the Burnham Properties, L.P. site

 

Project Allocation

5,000,000

(45)  Monroe County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(B)  Construction, renovation, infrastructure and other related costs for rehabilitation of the courthouse

 

Project Allocation

5,000,000

(i.1)  Monroe County Industrial Development Authority

 

(A)  Infrastructure and other related costs for the Route 611 Corridor gas line project

 

Project Allocation

10,000,000

(B)  Construction, infrastructure and critical improvements to interstate exits 298 and 299 and interchanges in Pocono Township to address traffic issues and future development

 

Project Allocation

3,750,000

(i.2)  Barrett Township

 

(A)  Infrastructure and redevelopment of the former Buck Hill Inn, including construction of a hotel/condominium complex

 

Project Allocation

3,500,000

(ii)  Chestnuthill, Eldred and Polk Townships

 

(A)  Acquisition, construction, infrastructure, redevelopment and other related costs for the West End economic development project

 

Project Allocation

2,500,000

(iii)  Coolbaugh Township

 

(A)  Construction of an access road to the Pocono Mountains Corporate Center South

 

Project Allocation

3,000,000

(B)  Redevelopment of the Pocono Mountains Corporate Center East, including construction, infrastructure and other related costs

 

Project Allocation

4,000,000

(C)  Development of a rail-served business park in Coolbaugh Township, including construction, infrastructure and other related costs

 

Project Allocation

3,000,000

(iv)  Delaware Water Gap Borough

 

(A)  Construction, infrastructure and other related costs to redevelop the former Laird Technologies building

 

Project Allocation

6,000,000

(B)  Construction, infrastructure, redevelopment and other related costs for Castle Inn restorations

 

Project Allocation

1,000,000

(C)  Construction, renovation, infrastructure and other related costs for the Cherry Creek Access project

 

Project Allocation

250,000

(v)  East Stroudsburg Borough

 

(A)  Demolition, redevelopment and construction of the former International Boiler Works building, including infrastructure and other related costs

 

Project Allocation

3,000,000

(B)  Construction and infrastructure related to the development of a work-class synchronous data center, including related costs

 

Project Allocation

3,000,000

(C)  Acquisition, construction, infrastructure, redevelopment and other related costs for Pocono Health System/Pocono Medical Center facilities

 

Project Allocation

34,000,000

(vi)  Mount Pocono Borough

 

(A)  Construction, infrastructure, rehabilitation and other costs related to dam replacement at Stillwater Lake

 

Project Allocation

2,500,000

(vii)  Pocono Township

 

(A)  Construction of a hotel and indoor waterpark, including infrastructure and other related costs

 

Project Allocation

10,000,000

(viii)  Pocono, Coolbaugh and Tunkhannock Townships

 

(A)  Development of the Route 611 Corridor  Gas Line Project, including infrastructure and other related costs

 

Project Allocation

10,000,000

(ix)  Smithfield Township

 

(A)  Construction, infrastructure and other related costs for a resort complex, including a conference center

 

Project Allocation

10,000,000

(B)  Construction and infrastructure related to the development of the Penn Regional Business Center project for Wall Street West and other companies

 

Project Allocation

13,300,000

(C)  Acquisition, construction, infrastructure and other related costs for the development of Westfield Hospital North

 

Project Allocation

5,000,000

(x)  Stroudsburg Borough

 

(A)  Acquisition and renovation of a downtown Stroudsburg hotel and construction of an associated parking garage, including infrastructure and other related costs

 

Project Allocation

5,000,000

(B)  Acquisition, construction, infrastructure and other related costs for the Pocono Family YMCA

 

Project Allocation

18,000,000

(C)  Acquisition, renovation, infrastructure, construction and other costs related to the Monroe County YMCA

 

Project Allocation

7,000,000

(D)  Acquisition, construction, infrastructure, redevelopment and other related costs for the Stroudsburg Volunteer Fire Department Station

 

Project Allocation

2,000,000

(E)  Construction and infrastructure related to the development of the Pocono Lutheran Village conversion to an independent living facility

 

Project Allocation

500,000

(F)  Acquisition, renovation, infrastructure, construction and other costs related to the new Pocono Family YMCA building and fields

 

Project Allocation

7,000,000

(G)  Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for a new Pocono Family YMCA

 

Project Allocation

7,000,000

(H)  Construction and infrastructure related to the development of the Pocono Lutheran Village conversion to an independent living facility

 

Project Allocation

500,000

(xi)  Tobyhanna Township

 

(A)  Construction, infrastructure, redevelopment and other related costs for improvements at New Ventures Commercial Park

 

Project Allocation

3,000,000

(B)  Expansion of the Pocono Mountain Regional Police Headquarters located in Pocono Summit

 

Project Allocation

2,300,000

(46)  Montgomery County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

5,000,000

(B)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

10,000,000

(C)  Construction of a multi-use recreational trail between Heuser Park and Valley Forge Park as part of the Schuylkill River West trail project

 

Project Allocation

900,000

(D)  Acquisition, redevelopment, rehabilitation and renovations of property and buildings and equipment costs for a school for children with complex learning disabilities

 

Project Allocation

1,000,000

(i.1)  Montgomery County Redevelopment Authority

 

(A)  Infrastructure, construction and other related costs for a LEED-certified multiuse development, including condominiums, commercial space and underground parking garage

 

Project Allocation

2,000,000

(B)  Infrastructure, construction and other related costs for a mixed-use transit-oriented development project at the Ardmore Station, including new construction and site improvements

 

Project Allocation

10,000,000

(C)  Infrastructure, construction and other related costs for the Sanatoga Springs commercial development in Limerick

 

Project Allocation

6,500,000

(ii)  Abington Township

 

(A)  Construction, infrastructure and other related costs for the Abington Memorial Hospital Neonatal Intensive Care Unit expansion project

 

Project Allocation

1,000,000

(B)  Construction, infrastructure and other related costs for a neurosciences institute at Abington Memorial Hospital

 

Project Allocation

2,000,000

(C)  Construction, infrastructure, redevelopment and other related costs for the Holy Redeemer Hospital and Medical Center Cancer Program enhancements

 

Project Allocation

2,000,000

(D)  Construction, infrastructure, redevelopment and other related costs for the Holy Redeemer Hospital and Medical Center Neonatal Intensive Care Unit expansion project

 

Project Allocation

2,500,000

(E)  Construction, infrastructure and other related costs for Roychester Community House renovations

 

Project Allocation

280,000

(F)  Construction, infrastructure and other related costs for the Holy Redeemer Hospital and Medical Center St. Joseph's Manor renovation project

 

Project Allocation

2,100,000

(G)  Acquisition, construction, infrastructure and other related costs for Total Renal Care

 

Project Allocation

2,450,000

(H)  Construction, renovation, infrastructure and other related costs for the Keswick Valley parking improvements

 

Project Allocation

500,000

(I)  Acquisition, construction, infrastructure and other related costs for the Roslyn Town Commercial District

 

Project Allocation

500,000

(J)  Acquisition, construction and other costs related to the development of a new and/or expansion of a medical facility

 

Project Allocation

500,000

(iii)  Ambler Borough

 

(A)  Acquisition, construction, infrastructure and other related costs for a police and municipal service complex

 

Project Allocation

1,000,000

(B)  Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project in the borough

 

Project Allocation

1,000,000

(C)  Acquisition, construction and other related costs to redevelop the Ambler Main Street Rail Corridor

 

Project Allocation

5,000,000

(iii.1)  Bryn Athyn Borough

 

(A)  Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project in the borough

 

Project Allocation

1,000,000

(iii.2)  Cheltenham Borough

 

(A)  Construction, infrastructure and other costs related to the Elkins Park East Commercial District transportation enhancement project

 

Project Allocation

1,000,000

(B)  Construction, infrastructure and other costs related to The Elkins Estate

 

Project Allocation

1,004,000

(iv)  Conshohocken Borough

 

(A)  Construction and other related costs to redevelop the Verizon building

 

Project Allocation

2,000,000

(B)  Construction, redevelopment and other related costs for the Conshohocken Train Station and parking garage

 

Project Allocation

3,000,000

(C)  Construction, renovation, infrastructure and other related costs for the riverfront improvement project

 

Project Allocation

250,000

(D)  Construction, renovation, infrastructure and other related costs for the Matsonford Bridge project

 

Project Allocation

800,000

(E)  Infrastructure, renovations, rehabilitation, construction and other related costs for redevelopment of the Conshohocken train station, including the construction of a new parking garage

 

Project Allocation

3,000,000

(F)  Infrastructure, construction and other related costs for the Millennium redevelopment on Washington Street

 

Project Allocation

4,500,000

(iv.1)  East Norriton Township

 

(A)  Construction, renovation, infrastructure and other related costs for the Public Safety facility for police, fire and ambulance

 

Project Allocation

6,000,000

(B)  Construction, renovation, infrastructure and other related costs for a public meeting room facility adjacent to the municipal building

 

Project Allocation

1,100,000

(C)  Construction, renovation, infrastructure and other related costs for a fire department expansion

 

Project Allocation

400,000

(iv.2)  Franconia Township

 

(A)  Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project in the borough

 

Project Allocation

1,000,000

(iv.3)  Glenside

 

(A)  Construction, renovation, infrastructure and other related costs for the Arcadia University arts building

 

Project Allocation

2,000,000

(B)  Construction, renovation, infrastructure and other related costs for the Arcadia University recreation center

 

Project Allocation

1,000,000

(v)  Hatboro Borough

 

(A)  Renovation of the Hatboro Police administration building, including construction and other related costs

 

Project Allocation

500,000

(B)  Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project in the borough

 

Project Allocation

1,000,000

(v.1)  Hatfield Borough

 

(A)  Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project in the borough

 

Project Allocation

1,000,000

(v.2)  Hatfield Township

 

(A)  Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project in the township

 

Project Allocation

1,000,000

(v.3)  Horsham Township

 

(A)  Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project in the township

 

Project Allocation

1,000,000

(B)  Renovation of a comprehensive geriatric care center and research facility, including site improvements, design, construction, infrastructure and other related costs

 

Project Allocation

1,500,000

(v.4)  Lansdale Borough

 

(A)  Construction, acquisition and redevelopment costs related to the renovation and expansion of the Lansdale Branch YMCA

 

Project Allocation

2,500,000

(v.5)  Lower Gwynedd Township

 

(A)  Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project in the township

 

Project Allocation

1,000,000

(vi)  Lower Merion Township

 

(A)  Construction, redevelopment and other related costs for Ashbridge Memorial Park improvements

 

Project Allocation

1,000,000

(B)  Construction and other related costs for the Lankenau Hospital expansion project

 

Project Allocation

25,000,000

(C)  Construction, renovation, infrastructure and other related costs for the Lower Merion revitalization project

 

Project Allocation

9,000,000

(D)  Construction, renovation, infrastructure and other related costs for the Ludington Library

 

Project Allocation

4,565,000

(E)  Renovation, construction and expansion of station facilities and parking at the Ardmore Station Transit Center

 

Project Allocation

10,000,000

(F)  Construction, infrastructure improvements and other costs related to the Lower Merion Township Fire and Public Safety Facilities

 

Project Allocation

500,000

(G)  Construction, infrastructure improvements and other costs related to the Riverbend Environmental Education Center

 

Project Allocation

600,000

(H)  Infrastructure, rehabilitation, construction and other related costs for improvements to the Ashbridge Memorial Park, including the construction of a satellite art center

 

Project Allocation

1,000,000

(vi.1)  Lower Moreland Township

 

(A)  Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project in the township

 

Project Allocation

1,000,000

(vi.2)  Lower Providence Township

 

(A)  Infrastructure improvements, renovations and other related costs for Eagleville Hospital

 

Project Allocation

600,000

(B)  Acquisition, infrastructure improvements, security measures, traffic enhancement and redevelopment of the area within and adjacent to the current Valley Forge Corporate Center

 

Project Allocation

10,000,000

(vii)  Lower Salford Township

 

(A)  Construction, infrastructure, redevelopment and other related costs for the Harleysville Area Emergency Medical Services headquarters

 

Project Allocation

750,000

(B)  Construction, redevelopment and other related costs for a community center expansion and renovation project

 

Project Allocation

250,000

(vii.1)  Montgomery Township

 

(A)  Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project in the township

 

Project Allocation

1,000,000

(viii)  Norristown Borough

 

(A)  Acquisition, construction and other related costs for a mixed-use commercial/retail development within the boundary of Fornance Street, Wood Street and Locust Street

 

Project Allocation

10,000,000

(B)  Construction and other related costs for the redevelopment of the former Sacred Heart Hospital

 

Project Allocation

5,000,000

(C)  Construction, infrastructure, abatement of hazardous materials and other related costs for the redevelopment of the Norristown State Hospital grounds

 

Project Allocation

100,000,000

(D)  Construction, redevelopment and other related costs for the Mission Kids Center

 

Project Allocation

1,000,000

(E)  Construction, infrastructure and other related costs for the redevelopment of the former Montgomery Hospital location

 

Project Allocation

10,000,000

(F)  Construction, redevelopment and other related costs for the Elmwood Park Zoo

 

Project Allocation

2,000,000

(G)  Construction, renovation, infrastructure and other related costs for the College and University Workforce Center

 

Project Allocation

2,000,000

(H)  Acquisition, construction, renovation, infrastructure and other related costs for the Central Business Redevelopment Sites at Main and DeKalb Streets

 

Project Allocation

5,000,000

(I)  Development of a commercial center at the corner of Main and Walnut Streets

 

Project Allocation

5,000,000

(viii.1)  North Wales Borough

 

(A)  Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project in the borough

 

Project Allocation

1,000,000

(B)  Demolition and redevelopment of the North Wales Water Authority facility located within Upper Gwynedd Township

 

Project Allocation

1,000,000

(viii.2)  Pottstown Borough

 

(A)  Montgomery County Community College - efficiency, solar and geothermal upgrades to central campus energy management systems

 

Project Allocation

1,250,000

(viii.3)  Rockledge Borough

 

(A)  Construction, infrastructure, rehabilitation and costs related to streetscape and lighting upgrades

 

Project Allocation

250,000

(ix)  Souderton Borough

 

(A)  Renovation of the Souderton Train Station and associated freight building and wait station, including necessary costs

 

Project Allocation

1,000,000

(B)  Construction, infrastructure, hazardous materials abatement and redevelopment costs associated with the restoration of the Souderton Train Station

 

Project Allocation

1,000,000

(ix.1)  Springfield Township

 

(A)  Construction, infrastructure, renovations and other costs related to the Carson Valley High School Plus career centers project

 

Project Allocation

1,500,000

(B)  Demolition and construction of library and community center

 

Project Allocation

4,900,000

(C)  Land acquisition and redevelopment of the school district bus garage and expansion of Cisco Park

 

Project Allocation

563,000

(x)  Upper Dublin Township

 

(A)  Acquisition, construction, infrastructure and other related costs for Stern Academy Community Center

 

Project Allocation

1,500,000

(B)  Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project in the township

 

Project Allocation

1,000,000

(x.1)  Upper Gwynedd Township

 

(A)  Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project in the township

 

Project Allocation

1,000,000

(xi)  Upper Merion Township

 

(A)  Construction, renovations and infrastructure improvements for an industrial facility

 

Project Allocation

1,500,000

(B)  Construction, infrastructure and other related costs for the King of Prussia Studio

 

Project Allocation

2,500,000

(C)  Acquisition, construction, infrastructure, redevelopment and other related costs for the Village at Valley Forge

 

Project Allocation

25,000,000

(D)  Construction, renovation, infrastructure and other related costs for the Moore Irwin House

 

Project Allocation

1,000,000

(E)  Construction, renovation, infrastructure and other related costs for the King of Prussia Business Improvement District

 

Project Allocation

1,200,000

(xi.1)  Upper Moreland Township

 

(A)  Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project in the township

 

Project Allocation

1,000,000

(xi.2)  West Conshohocken Borough

 

(A)  Construction, renovation, infrastructure and other related costs for the Ford Street Gateway Streetscape project

 

Project Allocation

290,000

(B)  Construction, infrastructure, rehabilitation and costs related to streetscape and lighting upgrades

 

Project Allocation

580,000

(xii)  Whitemarsh Borough

 

(A)  Construction and other related costs to redevelop the former Magarity Site

 

Project Allocation

1,000,000

(xiii)  Whitemarsh Township

 

(A)  Construction, infrastructure, redevelopment and other related costs for Hope Lodge expansion and improvements

 

Project Allocation

1,000,000

(B)  Construction, infrastructure, redevelopment and other related costs for the Lincoln Fire Company expansion project

 

Project Allocation

1,200,000

(C)  Construction, redevelopment and other related costs to convert the Whitemarsh Township incinerator building into a fleet building

 

Project Allocation

1,000,000

(D)  Construction, infrastructure, redevelopment and other related costs for the Highlands Historical Society

 

Project Allocation

1,000,000

(xiv)  Whitpain Township

 

(A)  Construction, infrastructure, redevelopment and other related costs for the Montgomery County Community College Science Center

 

Project Allocation

1,500,000

(B)  Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for the installation of solar panels at College Hall, Montgomery County Community College

 

Project Allocation

500,000

(C)  Construction, infrastructure and other related costs for a new Emergency Services Station

 

Project Allocation

750,000

(D)  Montgomery County Community College Science Center Lab renovations at the Blue Bell Campus

 

Project Allocation

1,500,000

(E)  Infrastructure, construction and other costs related to the Whitpain/Broad Axe beautifying project, including traffic control upgrades

 

Project Allocation

500,000

(47)  Montour County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(48)  Northampton County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

5,000,000

(B)  Construction, renovations and infrastructure improvements for an industrial facility

 

Project Allocation

5,000,000

(C)  Acquisition, renovation, infrastructure, construction and other costs related to a Lehigh Valley Sports Facility

 

Project Allocation

7,000,000

(ii)  City of Bethlehem

 

(A)  Renovations, construction and other related costs for property located at Polk and Third Streets

 

Project Allocation

1,200,000

(B)  Construction, redevelopment and other related costs to PBS39 at SteelStacks

 

Project Allocation

4,000,000

(C)  Construction, infrastructure, redevelopment and other related costs to renovate Collier Hall of Science at Moravian College

 

Project Allocation

14,000,000

(D)  Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment and other related costs for the renovation and expansion of the Ben Franklin TechVentures incubator facility

 

Project Allocation

10,000,000

(E)  Construction, abatement of hazardous materials, infrastructure and other related costs to redevelop the Majestic Bethlehem Center

 

Project Allocation

20,000,000

(F)  Construction, renovation, infrastructure and other related costs for the Banana Factory Cultural Center

 

Project Allocation

2,000,000

(G)  Construction, renovation, infrastructure and other related costs for the ArtsQuest Festival Center

 

Project Allocation

3,000,000

(H)  Construction, infrastructure and other costs related to the Third Street parking garage for medical education building

 

Project Allocation

3,000,000

(I)  Acquisition, renovation, infrastructure, construction and other costs relating to the Lehigh Valley Charter High School for the Performing Arts

 

Project Allocation

5,000,000

(J)  Improvements and renovations to the Fowler Family Southside Center at the Northampton Community College

 

Project Allocation

3,000,000

(iii)  City of Easton

 

(A)  Acquisition, construction, redevelopment and other related costs to rehabilitate the former 6th Street fire station

 

Project Allocation

500,000

(B)  Acquisition, construction, redevelopment and other related costs to rehabilitate the Merchants Bank Building on Centre Square

 

Project Allocation

1,500,000

(C)  Acquisition, construction and other related costs to redevelop the Jacobs Produce Building

 

Project Allocation

1,000,000

(D)  Acquisition, construction, redevelopment and other related costs for a rehabilitation project at 687 Northampton Street and surrounding areas

 

Project Allocation

2,000,000

(E)  Acquisition, construction and other related costs to redevelop the Governor Wolf Building into a cultural center

 

Project Allocation

2,000,000

(F)  Acquisition, construction, redevelopment and other related costs to rehabilitate the Cottingham Building

 

Project Allocation

1,500,000

(G)  Construction, infrastructure, redevelopment and other related costs to rehabilitate the Bixler Building

 

Project Allocation

500,000

(H)  Acquisition, construction, redevelopment and other related costs to rehabilitate buildings along 5th, 6th and Northampton Streets

 

Project Allocation

2,000,000

(I)  Acquisition, construction, redevelopment and other related costs for the rehabilitation of the American Veterans Building

 

Project Allocation

500,000

(J)  Acquisition, construction, infrastructure, redevelopment and other related costs for parking and commercial facilities

 

Project Allocation

5,000,000

(K)  Acquisition, construction, infrastructure and other related costs for a new police station

 

Project Allocation

2,500,000

(L)  Construction, redevelopment and other related costs to rehabilitate the Quadrant Book Mart historical building

 

Project Allocation

750,000

(M)  Construction, infrastructure, redevelopment and other related costs to rehabilitate the former Simon Silk Mill

 

Project Allocation

5,000,000

(N)  Acquisition, construction, redevelopment and other related costs to rehabilitate 424 Reynolds Street and surrounding areas

 

Project Allocation

1,500,000

(O)  Acquisition, construction, redevelopment and other related costs to rehabilitate the former St. Michael's Church site

 

Project Allocation

500,000

(P)  Acquisition, construction, infrastructure and other related costs to redevelop industrial property in the south side of Easton at Lincoln and Coal Streets

 

Project Allocation

1,000,000

(Q)  Construction, infrastructure, redevelopment and other related costs for the State Theatre Center for the Arts

 

Project Allocation

1,500,000

(R)  Construction, infrastructure, redevelopment and other related costs for an Energy Reduction District at Lafayette College

 

Project Allocation

1,000,000

(S)  Acquisition, construction, redevelopment and other related costs for the rehabilitation of the historic A&D Tile Building

 

Project Allocation

1,000,000

(T)  Construction, infrastructure, redevelopment and other related costs for the College Hill Neighborhood Business Corridor revitalization project

 

Project Allocation

2,500,000

(U)  Acquisition, construction and other related costs for a new City Hall facility

 

Project Allocation

2,500,000

(V)  Construction, infrastructure, abatement of hazardous materials, redevelopment and other related costs for the Easton Area Community Center

 

Project Allocation

1,750,000

(W)  Acquisition, construction, redevelopment and other related costs for a historic building at 542 Northampton Street and surrounding areas

 

Project Allocation

1,000,000

(X)  Construction, infrastructure, redevelopment and other related costs for rehabilitation projects at 118-120 Northampton Street and surrounding areas

 

Project Allocation

500,000

(Y)  Construction, infrastructure, redevelopment and other related costs for a theater in the city's Bushkill Corridor

 

Project Allocation

500,000

(iii.1)  Bethlehem Township

 

(A)  Construction, redevelopment and infrastructure improvements for the Brodhead Towne Center

 

Project Allocation

5,000,000

(iv)  Bushkill Township

 

(A)  Construction of an outpatient health mall for St. Luke's Hospital and Health Network, including acquisition, redevelopment, infrastructure, abatement of hazardous materials and other related costs

 

Project Allocation

5,000,000

(B)  Infrastructure, renovations, rehabilitation, construction and other related costs for construction of a farm facility to be used for regional resources for many organizations serving individuals with disabilities

 

Project Allocation

400,000

(v)  Freemansburg Borough

 

(A)  Construction, infrastructure and other related costs for municipal building renovations

 

Project Allocation

1,800,000

(vi)  Hellertown Borough

 

(A)  Construction, redevelopment and other related costs for the Saucon Valley Community and Recreation Center

 

Project Allocation

1,800,000

(vi.1)  Lower Nazareth Township

 

(A)  Construction, redevelopment and infrastructure improvements for a commercial park at Mikron Road and Route 191

 

Project Allocation

1,000,000

(vi.2)  Lower Saucon Township

 

(A)  Construction, renovation, infrastructure and other costs related to rehabilitating the Meadows Road historic bridge

 

Project Allocation

350,000

(B)  Construction, renovation, infrastructure and other costs related to rehabilitating the Old Mill Bridge

 

Project Allocation

250,000

(C)  Construction, infrastructure and other costs related to rehabilitating Polk Valley Road and Route 412 streetscape and traffic signals

 

Project Allocation

300,000

(vii)  North Catasauqua Borough

 

(A)  Renovation of borough hall, including construction and related costs

 

Project Allocation

500,000

(viii)  Pen Argyl Borough

 

(A)  Acquisition, construction, infrastructure, redevelopment and other related costs for a YMCA

 

Project Allocation

1,000,000

(B)  Construction, renovation, infrastructure and other related costs for the Lookout Fire Station building

 

Project Allocation

2,750,000

(ix)  Wilson Borough

 

(A)  Construction, redevelopment and other related costs for an addition to the borough's municipal building for the police department

 

Project Allocation

500,000

(x)  Wilson Borough/City of Easton

 

(A)  Renovations, construction and other related costs for the former Dixie Cup Corporation manufacturing facility

 

Project Allocation

4,500,000

(49)  Northumberland County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(B)  Acquisition, site development, infrastructure improvements, rail and roadway improvements for a Regional Intermodal Business Park

 

Project Allocation

7,000,000

(C)  Infrastructure, renovations, rehabilitation, construction and other related costs for the development of an Off Highway Vehicle (OHV) Park multiuse recreation area

 

Project Allocation

3,600,000

(D)  Acquisition, infrastructure, renovations, rehabilitation, construction and other costs related to a new facility to house a higher education center

 

Project Allocation

3,000,000

(ii)  City of Sunbury

 

(A)  Establish a regional intermodal business park to include site development, land acquisition and infrastructure, rail and roadway improvements

 

Project Allocation

7,000,000

(iii)  Point Township/Ralpho Township

(A)  Construction, acquisition and redevelopment costs related to the rehabilitation of the former Fleetwood Facility into a new manufacturing plant

 

Project Allocation

5,000,000

(iv)  Coal Township

 

(A)  Acquisition, construction and renovation of a regional recreation center

 

Project Allocation

1,000,000

(50)  Perry County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(B)  Land acquisition, infrastructure improvements, construction and other related costs necessary to maintain the competitive position of an existing business entity or for the development of business-ready sites for potential business tenants

 

Project Allocation

2,000,000

(ii)  Howe Township

 

(A)  Construction, acquisition, infrastructure improvements and other related costs for commercial and mixed-use development projects within the township

 

Project Allocation

5,000,000

(51)  Philadelphia County

 

(i)  County Projects

 

(A)  Remediation, construction and other related costs for the repair of the dry dock and for crane removal at the Aker Philadelphia Shipyard

 

 

 

Project Allocation

4,000,000

(B)  Construction, installation and other related costs for robotic plate cutting and marking system at the Aker Philadelphia Shipyard

 

Project Allocation

500,000

(C)  Construction of a new paint hall at the Aker Philadelphia Shipyard

 

Project Allocation

5,000,000

(D)  Acquisition, construction, renovation, infrastructure and other costs related to facility upgrades at the Aker Philadelphia Shipyard

 

Project Allocation

15,000,000

(E)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

10,000,000

(F)  Acquisition, clearing, demolition, renovation, environmental remediation, construction, infrastructure, design, streets, utilities, fit out and other costs associated with the development of a supermarket facility with additional retail uses at 37th Street and Haverford Avenue

 

Project Allocation

24,000,000

(G)  Acquisition, clearing, demolition, renovation, expansion, environmental remediation, construction, infrastructure, streets, utilities and other costs associated with the redevelopment of an existing building adjacent to Independence Mall to be used for academic and historic preservation purposes

 

Project Allocation

20,000,000

(H)  Acquisition, clearing, demolition, renovation, environmental remediation, construction, infrastructure, streets, utilities and other costs associated with a transit-oriented development project within the boundary of North Broad Street, West 17th Street, West Glenwood Avenue and West Indiana Avenue

 

Project Allocation

20,000,000

(I)  Acquisition, construction, infrastructure and other related costs for redevelopment of a high-pressure water pumping station

 

Project Allocation

1,000,000

(J)  Infrastructure, renovations, rehabilitation, construction and other related costs for expansion of the Children's Hospital of Philadelphia, including the construction of a community medical center and a clinical research and support operations facility

 

Project Allocation

27,000,000

(K)  Library Company of Philadelphia for renovations to current facility, acquisition and renovations to adjacent properties

 

Project Allocation

4,000,000

(L)  Acquisition, clearing, demolition, renovation, environmental remediation, construction, infrastructure, design, streets, utilities and other costs associated with the development of physical assets by Drexel University or affiliated entities on or adjacent to the campus of Drexel University

 

Project Allocation

50,000,000

(ii)  City of Philadelphia

 

(A)  Expansion and renovation of the National Constitution Center

 

Project Allocation

14,000,000

(B)  Acquisition and development of the Northwest Sustainability Campus

 

Project Allocation

5,500,000

(C)  Acquisition, construction, infrastructure and other related costs for the American Revolution Center

 

Project Allocation

20,000,000

(D)  Acquisition, infrastructure, construction and other related costs for an industrial facility at the Philadelphia Navy Yard

 

Project Allocation

30,000,000

(E)  Acquisition, infrastructure, construction and other related costs for a facility at the Philadelphia Navy Yard for commercial, industrial or multipurpose use

 

Project Allocation

5,000,000

(F)  Construction and other related costs of a commercial medical office/clinic building and structured parking within the boundary of N. Broad Street, Olney Avenue and Wagner Avenue

 

 

 

 

Project Allocation

10,000,000

(G)  Infrastructure improvements and site preparation for development of the Philadelphia Navy Yard

 

Project Allocation

25,000,000

(H)  Demolition, design, infrastructure, construction, renovation of existing buildings and fit out of a mixed-use hotel and/or condominium development in the Art Museum area of Philadelphia

 

Project Allocation

25,000,000

(I)  Demolition, design, infrastructure, construction and fit out of a mixed-use development on North Broad Street in Philadelphia

 

Project Allocation

10,000,000

(J)  Acquisition, clearing, demolition, renovation, environmental remediation, construction, infrastructure, design, streets, utilities and other costs associated with the development of a library and classroom facility on or adjacent to the campus of Temple University

 

Project Allocation

100,000,000

(K)  Demolition, design, infrastructure, construction, renovation of existing buildings and fit out of a mixed-use hotel and parking development adjacent to the Piazza at Schmidt's

 

Project Allocation

45,000,000

(L)  Demolition, design, infrastructure, construction, renovation of existing buildings and fit out of a mixed-use hotel and parking facility at 2nd and Poplar Streets

 

Project Allocation

25,000,000

(M)  Demolition, design, infrastructure, construction, renovation of existing buildings and fit out of a residential development at 1400 Spring Garden Street

 

Project Allocation

25,000,000

(N)  Construction of a new business building for Holy Family University at its Northeast Philadelphia campus, including acquisition, infrastructure, abatement of hazardous materials and other related costs

 

Project Allocation

10,000,000

(O)  Construction, redevelopment and other related costs for the Frankford Senior Living Facility

 

Project Allocation

850,000

(P)  Construction, infrastructure and other related costs for the Frankford Friends School expansion project

 

Project Allocation

750,000

(Q)  Construction, infrastructure and other related costs for the expansion and renovation of the Aria Health Frankford campus emergency roof

 

Project Allocation

4,800,000

(R)  Construction, infrastructure and other related costs for the ASPIRA school expansion project

 

Project Allocation

1,910,000

(S)  Construction, infrastructure and other related costs for the restoration and expansion of the Krauth Memorial Library at the Lutheran Theological Seminary

 

Project Allocation

3,000,000

(T)  Acquisition, construction, infrastructure, redevelopment and other related costs for the Nicetown CDC Commercial Corridor revitalization project

 

Project Allocation

5,000,000

(U)  Acquisition, construction, infrastructure, redevelopment and other related costs for the Center in the Park community café project

 

Project Allocation

500,000

(V)  Construction, redevelopment and other related costs for the Sturgis Playground redevelopment project

 

Project Allocation

1,000,000

(W)  Acquisition, construction, infrastructure, redevelopment and other related costs for the African American Museum

 

Project Allocation

10,000,000

(X)  Acquisition, construction, infrastructure and other related costs for The Plaza at Enterprise Heights mixed-use development project

 

Project Allocation

10,000,000

(Y)  Construction, redevelopment and other related costs for the Esperanza multipurpose community center

 

Project Allocation

1,250,000

(Z)  Acquisition, construction and other related costs for an economic development project at 22 Jackson Street

 

Project Allocation

10,000,000

(AA)  Acquisition, construction, redevelopment and other related costs for the northwest business campus for sustainability

 

Project Allocation

5,000,000

(BB)  Construction, infrastructure, redevelopment and other related costs for the LaSalle University School of Business reconstruction project

 

Project Allocation

12,000,000

(CC)  Acquisition, construction and other related costs for a charter school at 3601 South Front Street

 

Project Allocation

10,000,000

(DD)  Construction, infrastructure, redevelopment and other related costs for a new Community Legal Services building

 

Project Allocation

5,000,000

(EE)  Acquisition, construction, redevelopment and other related costs for the Attic Youth Center expansion project

 

Project Allocation

2,150,000

(FF)  Acquisition, construction and other related costs for a sports training and educational center at 22 East Wolf Street

 

Project Allocation

10,000,000

(GG)  Acquisition, construction and other related costs for a training and education center at 3670 South Lawrence Street

 

Project Allocation

10,000,000

(HH)  Acquisition, infrastructure, construction, abatement of hazardous materials and other related costs for the Elmwood Commons redevelopment project

 

Project Allocation

5,000,000

(II)  Acquisition, construction and other related costs for an auto repair workshop training center at 28 Ritner Street

 

Project Allocation

10,000,000

(JJ)  Acquisition, construction and other related costs for a residential housing project on the 400 block of Cantrell Street

 

Project Allocation

10,000,000

(KK)  Construction, acquisition and other related costs for an economic development project at 21 Wolf Street

 

Project Allocation

10,000,000

(LL)  Acquisition, construction and other related costs for a commercial manufacturing facility at 38 Jackson Street

 

Project Allocation

10,000,000

(MM)  Acquisition, construction and other related costs for a senior housing development at 1221-1231 South Broad Street

 

Project Allocation

10,000,000

(NN)  Acquisition, construction and other related costs for a residential housing project on the 500 block of Mercy Street

 

Project Allocation

10,000,000

(OO)  Construction, redevelopment and other related costs for the Ogontz Avenue Streetscape Project

 

Project Allocation

2,500,000

(PP)  Construction and other related costs for a new Life Sciences building at the University of Pennsylvania

 

Project Allocation

30,000,000

(QQ)  Construction, redevelopment and other related costs for the Mastery Charter Schools and Lenfest PAL Center project

 

Project Allocation

1,500,000

(RR)  Construction, infrastructure, redevelopment and other related costs for improvements to the Liberty Resources Market Street facility

 

Project Allocation

3,000,000

(SS)  Acquisition, construction and other related costs for a computer and billboard design training center at 2200 Weccacoe Avenue

 

Project Allocation

10,000,000

(TT)  Construction, acquisition, redevelopment and other related costs for Phase II of the Lancaster Avenue Revitalization Projec

 

Project Allocation

3,000,000

(UU)  Acquisition, construction, infrastructure and other related costs for a supermarket project at 31st Street and Girard Avenue in the Brewerytown section

 

Project Allocation

7,000,000

(VV)  Acquisition, construction and other related costs for a charter school at 14 Pattison Avenue

 

Project Allocation

10,000,000

(WW)  Construction, abatement of hazardous materials, infrastructure, redevelopment and other related costs for the Self Help Movement restoration and beautification project

 

Project Allocation

1,750,000

(XX)  Construction, redevelopment and other related costs for the Philadelphia Zoo intermodal project

 

Project Allocation

19,500,000

(YY)  Construction of a comprehensive applied research/educational facility at Drexel University, including related costs

 

Project Allocation

10,000,000

(ZZ)  Construction, infrastructure and other related costs to revitalize FDR Park

 

Project Allocation

10,000,000

(AAA)  Construction, infrastructure, redevelopment and other related costs for the United Way of Southeastern PA Parkway building capital improvement project

 

Project Allocation

2,000,000

(BBB)  Acquisition, construction and other related costs for a senior housing project at 1201 Jackson Street

 

Project Allocation

10,000,000

(CCC)  Acquisition, construction, infrastructure, redevelopment and other related costs for improvements to five city ice rinks

 

Project Allocation

1,000,000

(DDD)  Acquisition, construction, infrastructure, redevelopment and other related costs for a supermarket project on Germantown Avenue in the Nicetown section

 

Project Allocation

5,500,000

(EEE)  Construction, infrastructure and other related costs to renovate the Simons Community Recreation Center

 

Project Allocation

2,000,000

(FFF)  Construction, redevelopment and other related costs for the ECA's John S. and James L. Knight Green Jobs Training Center

 

Project Allocation

853,000

(GGG)  Acquisition, construction, infrastructure, redevelopment and other related costs for the William Way senior housing project

 

Project Allocation

7,000,000

(HHH)  Construction and other related costs for the Germantown Avenue redevelopment project

 

Project Allocation

5,000,000

(III)  Capital improvements to Gifford Playground and Park

 

Project Allocation

500,000

(JJJ)  Construction, renovation, infrastructure and other related costs for the Schuylkill Water Screens project

 

Project Allocation

3,500,000

(KKK)  Construction, renovation, infrastructure and other related costs for the Roxborough Hospital Medical Behavioral Unit

 

Project Allocation

750,000

(LLL)  Construction, renovation, infrastructure and other related costs for the Roxborough Hospital Emergency Room expansion project

 

Project Allocation

1,000,000

(MMM)  Construction, renovation, infrastructure and other related costs for the Roxborough Hospital medical office building

 

Project Allocation

12,500,000

(NNN)  Construction, renovation, infrastructure and other related costs for the rehabilitation of Sojourner House

 

Project Allocation

800,000

(OOO)  Construction, renovation, infrastructure and other related costs for an office building for community legal services

 

Project Allocation

5,000,000

(PPP)  Construction, renovation, infrastructure and other related costs for the Progress Plaza redevelopment and expansion project

 

Project Allocation

1,000,000

(QQQ)  Acquisition, construction, renovation, infrastructure and other related costs for the Allegheny Commons Apartments project

 

Project Allocation

5,000,000

(RRR)  Construction, renovation, infrastructure and other related costs for the Porter's Community expansion project

 

Project Allocation

500,000

(SSS)  Construction, renovation, infrastructure and other related costs for the Leon H. Sullivan Complex

 

Project Allocation

1,000,000

(TTT)  Acquisition, construction, renovation, infrastructure and other related costs for the Paul's Run Retirement Community

 

Project Allocation

500,000

(UUU)  Construction, renovation, infrastructure and other related costs for the Liberty USO section of Terminal A at the Philadelphia International Airport

 

Project Allocation

1,000,000

(VVV)  Construction, renovation, infrastructure and other related costs for the Glen Foerd on the Delaware Mansion

 

Project Allocation

5,000,000

(WWW)  Construction, renovation, infrastructure and other related costs for the Franklin Towne Charter Elementary School

 

Project Allocation

3,500,000

(XXX)  Construction, renovation, infrastructure and other related costs for the CORA Neumann Neighborhood revitalization project

 

Project Allocation

1,000,000

(YYY)  Construction and other related costs for the University of the Sciences McNeil Science and Technology Center

 

Project Allocation

22,000,000

(ZZZ)  Acquisition, construction, renovation, infrastructure and other related costs for the Cobbs Creek Shopping Center

 

Project Allocation

7,000,000

(AAAA)  Construction, renovation, infrastructure and other related costs for the Schuylkill River Trail at Bartram's Garden in Southwest Philadelphia

 

Project Allocation

4,000,000

(BBBB)  Construction, renovation, infrastructure and other related costs for Chestnut Hill College multicampus improvement projects

 

Project Allocation

10,000,000

(CCCC)  Construction, renovation, infrastructure and other related costs for the First Methodist Church of Germantown

 

Project Allocation

475,000

(DDDD)  Construction, renovation, infrastructure and other related costs for the Lutheran Theological Seminary Krauth Memorial Library

 

Project Allocation

3,000,000

(EEEE)  Construction, acquisition, redevelopment and other related costs for a solar and other energy products manufacturing plant

 

Project Allocation

5,000,000

(FFFF)  Construction, infrastructure and other related costs for the Philadelphia Housing Authority Norris Apartments development project

 

Project Allocation

10,000,000

(GGGG)  Construction, renovation, infrastructure and other related costs for the Philadelphia Housing Authority Queen Lane project

 

Project Allocation

10,000,000

(HHHH)  Construction, renovation, infrastructure and other related costs for the Abraham Lincoln Foundation Heritage Center

 

Project Allocation

2,000,000

(IIII)  Construction, renovation, infrastructure and other related costs for St. Monica Manor Skilled Nursing Home

 

Project Allocation

5,000,000

(JJJJ)  Construction, renovation, infrastructure and other related costs for the Leon H. Sullivan Complex

 

Project Allocation

1,000,000

(KKKK)  Construction, renovation, infrastructure and other related costs for CATCH's Patriot House

 

Project Allocation

1,500,000

(LLLL)  Acquisition, construction, renovation, infrastructure and other related costs for the Freire Charter School

 

Project Allocation

2,000,000

(MMMM)  Construction, renovation, infrastructure and other related costs for Hahnemann University Hospital

 

Project Allocation

20,000,000

(NNNN)  Acquisition, construction, renovation, infrastructure and other related costs for the Pennsylvania Ballet

 

Project Allocation

15,000,000

(OOOO)  Acquisition, construction, renovation, infrastructure and other related costs for the Juniper Hotel mixed-use commercial property project

 

Project Allocation

9,700,000

(PPPP)  Acquisition, construction, renovation, infrastructure and other related costs for a hotel property located adjacent to the Pennsylvania Convention Center at 1200-1212 Arch Street

 

Project Allocation

500,000

(QQQQ)  Construction, renovation, infrastructure and other related costs for the Associated Services for the Blind headquarters

 

Project Allocation

2,500,000

(RRRR)  Construction, renovation, infrastructure and other related costs for the Women Against Abuse project

 

Project Allocation

800,000

(SSSS)  Acquisition, construction, renovation, infrastructure and other related costs for the West Poplar Neighborhood Advisory Council/Nature Soy Inc.

 

Project Allocation

3,000,000

(TTTT)  Construction, renovation, infrastructure and other related costs for the Bridge of Hope School and Community Center

 

Project Allocation

3,000,000

(UUUU)  Site development, remediation and construction of the Gray's Ferry Gateway retail and medical office project

 

Project Allocation

8,500,000

(VVVV)  Construction, redevelopment and other related costs for the Hunting Park revitalization project

 

Project Allocation

10,000,000

(WWWW)  Construction, redevelopment and other related costs for the Christ Church Neighborhood House revitalization project

 

Project Allocation

3,000,000

(XXXX)  Construction, infrastructure and other related costs for the Christy Recreation Center improvement project

 

Project Allocation

1,000,000

(YYYY)  Construction, redevelopment, restoration and other related costs for the Calvary Center for Culture and Community project

 

Project Allocation

1,000,000

(ZZZZ)  Construction, redevelopment and other related costs for the Eastern State Penitentiary improvement project

 

Project Allocation

5,750,000

(A5)  Construction, abatement of hazardous materials, redevelopment and other related costs for the Hub 3939 project

 

Project Allocation

1,000,000

(B5)  Construction, abatement of hazardous materials, redevelopment and other related costs for the Hub 4001 project

 

Project Allocation

1,000,000

(C5)  Acquisition, construction and other related costs for a redevelopment project along Fairmount Avenue, Wallace Street, 13th Street, 15th Street and surrounding areas

 

Project Allocation

5,000,000

(D5)  Construction, infrastructure and other related costs for the Christian Street YMCA project

 

Project Allocation

500,000

(E5)  Construction, acquisition and other related costs for the GALA senior housing project

 

Project Allocation

3,000,000

(F5)  Acquisition, demolition, renovation, infrastructure, construction and other costs related to the development of the Royal Theater and Universal Commercial Complex

 

Project Allocation

31,000,000

(G5)  Construction, infrastructure, renovation, equipment and other costs related to the expansion of the Nature Soy manufacturing plant at 10th Street and Fairmount Avenue

 

Project Allocation

1,500,000

(H5)  Acquisition, renovation, infrastructure, construction and other costs related to the Philadelphia Animal Welfare Society shelter

 

Project Allocation

6,000,000

(I5)  Construction, infrastructure, renovation, equipment and other costs related to the Reading Terminal Market renovations and systems enhancement project

 

Project Allocation

2,500,000

(J5)  Construction, infrastructure, renovation, equipment and other costs related to 901 East Market Street buildings for retail and mixed-use redevelopment

 

Project Allocation

10,000,000

(K5)  Acquisition, renovations, rehabilitation, construction and other costs for facilities and projects at Fox Chase Cancer Center

 

Project Allocation

28,000,000

(L5)  Construction, rehabilitation, infrastructure improvements, renovations and other costs relating to the Rock School for Dance Education

 

Project Allocation

1,200,000

(M5)  Acquisition, renovations, rehabilitation, infrastructure, construction and other costs for 2116 Chestnut Street mixed-use development project

 

Project Allocation

15,000,000

(N5)  Acquisition, construction, infrastructure, renovations, rehabilitation and other related costs for Dance Affiliates

 

Project Allocation

10,000,000

(O5)  Acquisition, renovations, rehabilitation, stabilization, construction and other costs for the Philadelphia Flower Show and neighborhood beautification and revitalization projects

 

Project Allocation

5,000,000

(P5)  Infrastructure, construction, renovation, rehabilitation and other related costs for the Pennsylvania Ballet on North Broad Street and Wood Street

 

Project Allocation

5,000,000

(Q5)  Construction, renovation, stabilization and other related costs for the Eastern State Penitentiary site at 2027 Fairmount Avenue

 

Project Allocation

20,000,000

(R5)  Infrastructure, construction, renovation, rehabilitation and other related costs for the Aria Health-Torresdale campus

 

Project Allocation

5,000,000

(S5)  Infrastructure, acquisition, construction, renovation and other related costs for the Philadelphia Performing Arts Charter School

 

Project Allocation

7,500,000

(T5)  Acquisition, construction, renovations, rehabilitation and other related costs for a mixed-use hotel development on Pier 34

 

Project Allocation

7,000,000

(U5)  Construction, rehabilitation, infrastructure improvements, renovations and other costs relating to FDR Park, including the boathouse, gazebo and lakes project

 

Project Allocation

6,000,000

(V5)  Acquisition, construction, renovations, rehabilitation and other related costs for a live entertainment venue at 2055 Richmond Street

 

Project Allocation

2,000,000

(W5)  Construction, rehabilitation, infrastructure improvements, renovations and other costs relating to the New Freedom Theatre

 

Project Allocation

500,000

(X5)  Acquisition, construction, renovations, rehabilitation and other related costs for the Beloved St. John CDC transitional housing and youth education project

 

Project Allocation

250,000

(Y5)  Construction, rehabilitation, infrastructure improvements, renovations and other costs for the Salvation Army Eliza Shirley Campus, Phase I

 

Project Allocation

350,000

(Z5)  Construction, rehabilitation, infrastructure improvements, renovations and other costs for the Main Campus of Methodist Services for Children

 

Project Allocation

2,000,000

(A6)  Construction, rehabilitation, infrastructure improvements, renovations and other costs for the 52nd and Poplar Streets development project

 

Project Allocation

3,000,000

(B6)  Construction, rehabilitation, infrastructure improvements, renovations and other costs for Progress Haddington Plaza

 

Project Allocation

2,100,000

(C6)  Construction, renovations, infrastructure and other costs related to the Christ Church Neighborhood House revitalization project

 

Project Allocation

3,000,000

(D6)  Construction, renovations, infrastructure and other costs related to the St. Maron Seniors Residence

 

Project Allocation

500,000

(E6)  Construct new building and renovate existing building at the Philadelphia Navy Yard to improve energy efficiency and operability and reduce carbon emissions of existing buildings and to stimulate private investment and quality job creation in building energy efficiency retrofit markets

 

Project Allocation

30,000,000

(F6)  Acquisition, construction and other costs related to renovations of a historic building for a Waterfront Cultural Center on Delaware Avenue

 

Project Allocation

1,000,000

(G6)  Construction, demolition, renovations, infrastructure and other costs related to the expansion of the campus of the Philadelphia College of Osteopathic Medicine

 

Project Allocation

25,000,000

(H6)  Acquisition, redevelopment and related costs for 4601 Market Street for use as a police headquarters and other municipal uses

 

Project Allocation

25,000,000

(I6)  Construction, redevelopment and related costs for the Associated Services for the Blind building at 9th and Chestnut Streets

 

Project Allocation

2,500,000

(J6)  Acquisition, redevelopment and infrastructure improvements to the central Delaware riverfront within the Delaware River Waterfront Corporation's planning district

 

Project Allocation

50,000,000

(K6)  Acquisition, construction, infrastructure and other related costs to revitalize East Market Street between City Hall and Independence Mall

 

Project Allocation

50,000,000

(L6)  Acquisition, construction, infrastructure and other related costs for redevelopment of the EPPI facility at Henry Avenue and Roosevelt Boulevard, including adjacent areas

 

Project Allocation

20,000,000

(M6)  Acquisition, construction, infrastructure and other related costs to revitalize the Lower Schuylkill area from Grays Ferry Avenue to 70th Street, including adjacent areas

 

Project Allocation

50,000,000

(N6)  Acquisition, construction, infrastructure and other related costs for mixed-use projects supporting universities in Philadelphia

 

Project Allocation

50,000,000

(O6)  Acquisition, construction, infrastructure and other related costs for skate parks and open park space in neighborhood stabilization target areas in Point Breeze, Nicetown and Mantua

 

Project Allocation

3,000,000

(P6)  Acquisition, construction, infrastructure and other related costs for the development of supermarkets in Philadelphia

 

Project Allocation

20,000,000

(Q6)  Construction, infrastructure and other related costs for the renovation and expansion of the Neumann Center Facility as part of the CORA Neumann Neighborhood revitalization project

 

Project Allocation

1,000,000

(R6)  Acquisition, redevelopment, infrastructure, construction and other  costs related to the Allegheny Commons Apartment project for retail, parking and housing use

 

Project Allocation

5,000,000

(S6)  Acquisition, redevelopment, infrastructure, construction and other costs related to the National Comprehensive Center for Fathers project for manufacturing and office space

 

Project Allocation

5,000,000

(T6)  Acquisition, redevelopment, infrastructure, construction and other costs related to the ACHIEVEability self-sufficiency project for housing

 

Project Allocation

2,600,000

(U6)  Redevelopment, infrastructure, construction and other costs related to the Falls Center project for a mixed-use facility

 

Project Allocation

5,000,000

(V6)  The University of the Arts in Philadelphia for the renovation and reconstruction of its historic facilities that house the University's School of Music, including Merriam Theater and Gershman Hall

 

Project Allocation

5,000,000

(W6)  The University of the Arts in Philadelphia for the renovation and reconstruction of performance and rehearsal spaces in the School of Music

 

Project Allocation

1,500,000

(X6)  Construction and development of combined new structures and historic rehabilitation of existing structures to allow for the relocation and consolidation of the family court and the police administration headquarters

 

Project Allocation

250,000,000

(Y6)  Construction, infrastructure, redevelopment and other costs related to the Avenue of the Arts for improvements to North Broad Street between Spring Garden and Norris Streets for streetscape enhancements

 

Project Allocation

15,000,000

(Z6)  Land acquisition, site preparation, demolition, construction, infrastructure, redevelopment and other related costs for Thomas Jefferson University

 

Project Allocation

30,000,000

(A7)  Construction and other related costs for the Sidney Hillman Medical Center

 

Project Allocation

5,000,000

(B7)  Construction, infrastructure improvements, renovations, expansion and related costs for the Arden Theatre Company on North Second Street

 

Project Allocation

10,000,000

(C7)  Construction, infrastructure, redevelopment and other costs related to the Center for Culinary Enterprises

 

Project Allocation

500,000

(D7)  Acquisition, construction, infrastructure, redevelopment and other costs related to Phase II of the Strawberry Mansion housing development project, from Berks Street to Cecil B. Moore Avenue

 

Project Allocation

2,000,000

(E7)  Construction, infrastructure, redevelopment and other costs related to the Mt. Vernon Manor Apartments project

 

Project Allocation

2,000,000

(F7)  Acquisition, construction, infrastructure, redevelopment and other costs related to the Susquehanna Townhouses project in North Philadelphia

 

Project Allocation

2,000,000

(G7)  Renovations and other related costs for Intercultural Family Services, Inc., for the outpatient clinic and main building located at 4225 Chestnut Street

 

Project Allocation

1,000,000

(H7)  Acquisition, construction, infrastructure, redevelopment and other costs related to the revitalization of West Parkside neighborhood through commercial and mixed-use property development and revitalization, streetscape enhancements and relocation and redevelopment of city-owned facilities

 

Project Allocation

20,000,000

(I7)  Acquisition, construction, infrastructure, redevelopment and other costs related to the Beech International Complex at Temple University

 

Project Allocation

1,000,000

(J7)  Construction and other costs related to the continuation of Phase II of The Mann Center's improvement project for its campus and amphitheater in West Fairmount Park

 

Project Allocation

15,000,000

(K7)  Development and construction of a multi-use shopping center at Elmwood Commons

 

Project Allocation

35,000,000

(L7)  Construction, infrastructure, redevelopment and other costs related to the City Avenue revitalization project for 63rd Street between City and Overbrook Avenues

 

Project Allocation

250,000

(M7)  Acquisition, construction, design, infrastructure improvements and other related costs for expansion of classroom facilities, multipurpose theater and urban garden for the Philadelphia School

 

Project Allocation

5,000,000

(N7)  Construction, infrastructure, redevelopment and other costs related to the Hub 3939 project, Phase II, for retail and mixed-use development at 40th Street and Chestnut Street

 

Project Allocation

1,000,000

(O7)  Construction and other costs related to the Children's Hospital of Philadelphia expansion project

 

Project Allocation

27,000,000

(P7)  Construction, infrastructure, redevelopment and other costs related to the upgrade and renovation of the Academy of Music

 

Project Allocation

5,000,000

(Q7)  Construction and other costs related to the MaST Community Charter School Library and Media Center project

 

Project Allocation

1,000,000

(R7)  Acquisition, construction, infrastructure, redevelopment and other costs related to facilities at St. Christopher's Hospital for Children

 

Project Allocation

20,000,000

(S7)  Construction, infrastructure, redevelopment and other costs related to the emergency, operating and labor and delivery areas at Temple University Hospital

 

Project Allocation

4,000,000

(T7)  Construction, infrastructure, redevelopment and other costs related to the West Kensington Ministry at Norris Square

 

Project Allocation

500,000

(U7)  Acquisition, construction, infrastructure, redevelopment and other costs related to facilities at Magee Rehabilitation Hospital

 

Project Allocation

500,000

(V7)  Construction, infrastructure and other related costs for the revitalization of the Conshohocken-Windemere Playground

 

Project Allocation

2,000,000

(W7)  Acquisition, clearing, demolition, renovation, expansion, environmental remediation, construction, infrastructure, streets, utilities and other costs associated with the redevelopment of an existing building adjacent to Independence Mall to be used for academic and historic preservation purposes

 

Project Allocation

20,000,000

(X7)  Acquisition, clearing, demolition, renovation, environmental remediation, construction, infrastructure, streets, utilities and other costs associated with a transit-oriented development project within the boundary of North Broad Street, W. 17th Street, W. Glennwood Avenue and W. Indiana Avenue

 

Project Allocation

20,000,000

(Y7)  Construction, infrastructure and other related costs for enhancements to Charles Papa playground in Morris Park

 

Project Allocation

3,000,000

(Z7)  Acquisition, infrastructure, construction and other costs related to the Inglis Foundation alternative housing project

 

Project Allocation

2,000,000

(A8)  Construction, rehabilitation, infrastructure improvements, renovations and other costs for the Salvation Army Eliza Shirley campus, Phase I

 

Project Allocation

1,000,000

(B8)  Construction, infrastructure, redevelopment and other costs related to the City Avenue revitalization project for 63rd Street between City and Overbrook Avenues

 

Project Allocation

1,000,000

(C8)  Renovation and expansion of Simpson House retirement community

 

Project Allocation

10,000,000

(D8)  Construction and other related costs for the Allegheny Avenue New Courtland Life Center

 

Project Allocation

3,000,000

(E8)  Acquisition, construction and other related costs for 1000 South Street bank branch redevelopment project

 

Project Allocation

250,000

(F8)  Acquisition, construction and other related costs for former Reading Railroad building redevelopment on Spring Garden Street

 

Project Allocation

500,000

(G8)  Acquisition, construction and other related costs for the Regency Apartment building redevelopment along the North Broad corridor for housing

 

Project Allocation

1,000,000

(H8)  Rehabilitation, renovation and other costs relating to heating, ventilation, air conditioning systems, windows, plumbing fixtures and lighting at the International House

 

Project Allocation

5,250,000

(I8)  Construction, renovation, infrastructure improvements and other related costs for the Walnut Lane Golf Course and First Tee for Impact Services

 

Project Allocation

1,000,000

(J8)  Construction and renovation of the Saint Agnes Continuing Care Center, including infrastructure and ADA upgrades

 

Project Allocation

6,000,000

(K8)  Thomas Jefferson University Hospital, for the expansion of a Post Anesthesia Care Unit to increase capacity, accommodate increased patient acuity and enhance operational efficiency and patient safety

 

Project Allocation

2,000,000

(52)  Pike County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(ii)  Pike County Economic Development Authority

 

(A)  Infrastructure, construction and other related costs for the Tamiment Town Center in Lehman Township

 

Project Allocation

4,000,000

(iii)  Palmyra Township

 

(A)  Acquisition, infrastructure, construction and other related costs for a new career and technical center to serve the students and work force of Wayne and Pike Counties

 

Project Allocation

25,000,000

(53)  Potter County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(ii)  Eulalia Township

 

(A)  Infrastructure, construction, renovation and other costs related to a multiphased capital improvement project at Charles Cole Memorial Hospital and other Charles Cole health care facilities

 

Project Allocation

4,000,000

(54)  Schuylkill Count

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(B)  Acquisition, construction, infrastructure, redevelopment and other related costs for a community revitalization project

 

Project Allocation

5,000,000

(C)  Construction, infrastructure and other related costs for the Brandonville Pumping Station rehabilitation project

 

Project Allocation

1,000,000

(D)  Infrastructure, site development, construction and other costs related to the development of pad-ready industrial sites located within the Tidewood Industrial Park, including storm water management improvements

 

Project Allocation

815,000

(ii)  Schuylkill Economic Development Corporation

 

(A)  Infrastructure, construction, renovation, rehabilitation and other related costs for the development of the Highridge Business Park Travel Plaza

 

Project Allocation

1,750,000

(iii)  City of Pottsville

 

(A)  Infrastructure, construction and other related costs for infrastructure improvements to the Schuylkill Health System facilities, including the replacement and upgrades to fire alarm systems and chillers

 

Project Allocation

500,000

(iv)  Cass Township

 

(A)  Construction, infrastructure, redevelopment and other related costs for distribution facility renovations at Highridge Business Park

 

Project Allocation

5,000,000

(v)  Pine Grove Township

 

(A)  Infrastructure, construction and other related costs for the Spruce Drive subdivision project, including the development of single housing, a community center, retail and medical office space and assisted living facilities

 

Project Allocation

8,300,000

(vi)  West Mahanoy Township

 

(A)  Construction, infrastructure, redevelopment and other related costs for the Frackville Industrial Park improvement project

 

Project Allocation

1,000,000

(55)  Snyder County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(B)  Acquisition, construction, renovation, infrastructure and restoration of the Snyder County Courthouse

 

Project Allocation

1,000,000

(ii)  Monroe Township

 

(A)  Construction of new, modern, energy-efficient hangar, renovation of existing hangars, construction of new waste oil heating system and construction of additional T-hangars at Penn Valley Airport, including acquisition and other related costs

 

Project Allocation

1,345,000

(B)  Construction, acquisition and redevelopment costs for a new modern energy-efficient hangar, a new waste oil heating system, additional T-hangars, addition of a security system in order to comply with TSA requirements, repair and renovation of existing hangars and additional upgrades in machinery and equipment for the Penn Valley Airport

 

Project Allocation

1,500,000

(iii)  Selinsgrove Borough

 

(A)  Renovation and construction of administrative and/or academic facilities at Susquehanna University, including related costs

 

Project Allocation

3,000,000

(B)  Susquehanna University renewable/clean energy project, including related costs

 

Project Allocation

5,000,000

(C)  Expansion, renovation, related infrastructure and construction of the Selinsgrove Community Building

 

Project Allocation

3,000,000

(56)  Somerset County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(B)  Acquisition, construction, rehabilitation and replacement of capital facilities, including onsite infrastructure, located in and around Hidden Valley Resort

 

Project Allocation

5,000,000

(C)  Construction, infrastructure and other costs related to new facilities at the Allegany College of Maryland

 

Project Allocation

1,500,000

(ii)  Conemaugh Township

 

(A)  Construction, infrastructure, redevelopment and other related costs for the Greenhouse Park project

 

Project Allocation

500,000

(B)  Construction, infrastructure, redevelopment and other related costs for the Whitewater Park project

 

Project Allocation

500,000

(iii)  Jennerstown Borough

 

(A)  Construction, renovation, infrastructure and other costs related to the First Nation Wood Pellets manufacturing facility

 

Project Allocation

2,000,000

(iv)  Somerset Borough

 

(A)  Construction, renovation, infrastructure and other related costs for a multiphased project at Somerset Hospital and its other facilities

 

Project Allocation

10,000,000

(v)  Windber Borough

 

(A)  Construction, infrastructure, redevelopment and other related costs for the Windber Borough Recreational Park

 

Project Allocation

1,000,000

(57)  Sullivan County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(58)  Susquehanna County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(59)  Tioga Count

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(B)  Acquisition, infrastructure, construction and other related costs, including the abatement of hazardous materials for the construction of two Hydraulic Stimulation Fluid (HSF) manufacturing facilities in Blossburg and Atrium

 

Project Allocation

6,000,000

(C)  New construction of a second main line for high-volume points on existing railroad right-of-way, land acquisition and infrastructure necessary to support new and existing transloading operations, construction of turnouts and sidings to new and existing industry and rehabilitation of existing rail infrastructure for Wellsboro and Corning Railroad Company

 

Project Allocation

7,500,000

(ii)  Duncan Township

 

(A)  Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for the development of flowback and production wastewater and acid mine drainage treatment plants to treat and recycle hydrofracture and acid mine water

 

Project Allocation

6,000,000

(iii)  Mansfield Borough

 

(A)  Acquisition, redevelopment, construction and other related costs for the Mansfield Central Business District revitalization project, including the construction of a multipurpose facility

 

Project Allocation

3,000,000

(iv)  Richmond Township

 

(A)  Development of the Tioga County I-99 Business Park, Phase 2, including acquisition, construction and other related costs

 

Project Allocation

3,500,000

(v)  Westfield Borough and Westfield Township

 

(A)  Demolition, redevelopment, construction, infrastructure and other related costs of a 200,000-square-foot former vegetable tanning facility along Route 349 in Westfield Borough and Westfield Township for brownfield redevelopment

 

Project Allocation

5,000,000

(60)  Union County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(B)  Infrastructure, construction and other related costs for the construction of additional academic space on the campus of Bucknell University, including classrooms, faculty offices and laboratory spaces

 

Project Allocation

10,000,000

(C)  Infrastructure, construction and other related costs for the construction of structured parking facilities on the campus of Bucknell University

 

Project Allocation

6,000,000

(D)  Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs, including the abatement of hazardous materials, for the renovation of a historic campus theatre and the development of a regional performing and visual arts center

 

Project Allocation

9,000,000

(ii)  Kelly Township

 

(A)  Construction and infrastructure costs related to the expansion and renovation of the Evangelical Community Hospital

 

Project Allocation

10,000,000

(B)  Infrastructure, site preparation, construction, design and other costs related to building a new nursing and assisted living facility, a capital improvement project at Albright Care Services located in the township

 

Project Allocation

5,000,000

(61)  Venango County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(B)  Renovations, rehabilitation, construction and other costs related to county historical redevelopment projects, including improvements in the Venango County Courthouse and the Oil City Library

 

Project Allocation

601,000

(C)  Infrastructure, abatement of hazardous materials, renovations, rehabilitation, construction and all other costs related to county economic development projects, including the Barkeyville Corridor improvements, Brody Block redevelopment and revitalization and the Franklin Industrial and Commercial Development Authority economic growth project

 

Project Allocation

1,100,000

(62)  Warren County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(ii)  City of Warren

 

(A)  Construction, infrastructure, streetscape improvements and other related costs for the Warren downtown economic development project, Phase I, Part B

 

Project Allocation

1,000,000

(iii)  Youngsville Borough

 

(A)  Infrastructure, streetscape enhancements and other related costs for the Youngsville revitalization and economic redevelopment project, Phase I

 

Project Allocation

1,000,000

(63)  Washington County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(B)  Acquisition, redevelopment, construction and other related costs for the construction of the St. Clair Hospital outpatient center and medical office building

 

Project Allocation

8,000,000

(C)  Construction, infrastructure and other costs related to the Slovan Solar Park project in the Smith Township Industrial Park

 

Project Allocation

1,000,000

(ii)  City of Monongahela

 

(A)  Construction, redevelopment and other related costs for the Aquatorium project

 

Project Allocation

600,000

(iii)  City of Washington

 

(A)  Construction, infrastructure and other related costs for the Washington Park recreation improvement project

 

Project Allocation

2,500,000

(B)  Construction, infrastructure and other costs related to the renovation of historic buildings at Washington and Jefferson College

 

Project Allocation

5,000,000

(C)  Construction, infrastructure and other costs related to the renovation and expansion of dormitories at Washington and Jefferson College

 

Project Allocation

4,000,000

(D)  Construction, infrastructure and other costs related to conversion of a building to a Small Business Incubator at Washington and Jefferson College

 

Project Allocation

2,000,000

(E)  Acquisition, construction, infrastructure and other costs related to expansion of athletics facilities at Washington and Jefferson College

 

Project Allocation

10,000,000

(F)  Construction, infrastructure and other costs related to renovate buildings for office and classroom space at Washington and Jefferson College

 

Project Allocation

5,000,000

(G)  Site development, acquisition and construction of a legal aid building

 

Project Allocatio

2,000,000

(iv)  Bentleyville Borough

 

(A)  Construction of a new multipurpose community library/senior center

 

Project Allocation

2,000,000

(v)  California Borough

 

(A)  Construction, renovation, infrastructure and other related costs for the Hotel California project

 

Project Allocation

5,000,000

(vi)  Canonsburg Borough

 

(A)  Acquisition, construction, infrastructure and other related costs for Education Management Corporation expansion

 

Project Allocation

5,000,000

(B)  Construction, redevelopment, infrastructure improvements and other related costs for downtown streetscape project Phase II, including sidewalks and burying utility lines

 

Project Allocation

1,500,000

(vii)  Cecil Township

 

(A)  Infrastructure and site development to support the Cool Valley mixed-use project

 

Project Allocation

10,000,000

(B)  Infrastructure improvements to support the continued development of the Southpointe II Business Park

 

Project Allocation

3,000,000

(viii)  Charleroi Borough

 

(A)  Acquisition, construction and other related costs to renovate the Coyle Theatre

 

Project Allocation

750,000

(ix)  Chartiers Township

 

(A)  Construction and other related costs for a township community center

 

Project Allocation

1,200,000

(B)  Construction of new livestock facilities at the Washington County Agricultural Fair, Inc.

 

Project Allocation

1,000,000

(ix.1)  Fallowfield Township

 

(A)  Construction, infrastructure, redevelopment and other costs related to the Alta Vista Business Park

 

Project Allocation

1,500,000

(ix.2)  Hanover Township

 

(A)  Construction, infrastructure, redevelopment and other costs related to the Starpointe Business Park Phase 1-B project

 

Project Allocation

2,000,000

(x)  North Strabane Township

 

(A)  Redevelopment of the ARC Community Center, including related costs

 

Project Allocation

1,000,000

(B)  Acquisition, construction, infrastructure and other related costs for the California Technology Park Hotel and Convention Center project

 

Project Allocation

10,000,000

(xi)  South Franklin Township

 

(A)  Construction, infrastructure, redevelopment and other costs related to the Washington County Airport Northside development project

 

Project Allocation

1,500,000

(64)  Wayne County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(ii)  Honesdale Borough

 

(A)  Renovations, rehabilitation, construction and other costs related to expansion projects for the Wayne Memorial Hospital Chemotherapy and Oncology Department and the Wayne Memorial Community Health Centers' Honesdale Family Health Center and Behavioral Health Center

 

Project Allocation

1,327,000

(B)  Acquisition, site preparation, engineering, infrastructure, construction and other related costs for an emergency building replacement for the Honesdale EMS

 

Project Allocation

850,000

(iii)  Sterling Township

 

(A)  Property acquisition, construction, site development and infrastructure improvements for the Wayne County Business Park for the Wayne Pike Career and Technology Center

 

Project Allocation

1,000,000

(65)  Westmoreland County

 

(i)  County Projects

 

(A)  Construction, infrastructure, rehabilitation and other related costs at the Sony plant site

 

Project Allocation

15,000,000

(B)  Acquisition, infrastructure, construction and other related costs at the former Sony plant site

 

 

Project Allocation

30,000,000

(C)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

5,000,000

(D)  Infrastructure, improvements, construction abatement of hazardous materials and other related costs for the Marcellus Shale Learning Resource Center and the construction of a new research and laboratory building

 

Project Allocation

2,000,000

(i.1)  Westmoreland County Redevelopment Authority

 

(A)  Demolition, site clearance, environmental remediation, construction and other costs related to the redevelopment of the former Westinghouse site for future commercial or industrial reuse

 

Project Allocation

500,000

(ii)  City of Greensburg

 

(A)  Renovation and upgrades of facility and technologies at Mountain View Cancer Associates

 

Project Allocation

3,000,000

(B)  Infrastructure, rehabilitation, construction and other costs related to renovations and upgrades to the Mountain View Cancer Associates facilities

 

Project Allocation

3,500,000

(iii)  City of Jeannette

 

(A)  Construction, infrastructure, redevelopment and other related costs for the Elliott Company expansion project

 

Project Allocation

8,000,000

(iii.1)  City of Latrobe

 

(A)  Infrastructure, construction and other costs related to renovations and structural rehabilitation to a parking garage in downtown Latrobe

 

Project Allocation

1,750,000

(iv)  City of Monessen

 

(A)  Acquisition, renovation, infrastructure, construction and other costs related to the Alumisource site rehabilitation

 

Project Allocation

2,500,000

(v)  City of New Kensington

 

(A)  Construction, infrastructure and other related costs for redevelopment of the former Alcoa site

 

Project Allocation

2,000,000

(B)  Construction, renovation, infrastructure and other costs related to the Alcoa site reuse project

 

Project Allocation

2,000,000

(v.1)  North Huntington Township

 

(A)  Renovation, rehabilitation, construction and other costs related to Excela Health Westmoreland Hospital's Norwin Medical Commons expansion project

 

Project Allocation

750,000

(vi)  Salem Township

 

(A)  Construction and other related costs for a new training facility for a joint apprenticeship and training program for the Western Pennsylvania Operating Engineers

 

Project Allocation

6,500,000

(vii)  Trafford Borough

 

(A)  Acquisition, renovation, infrastructure, construction and other costs related to a youth center

 

Project Allocation

500,000

(viii)  Unity Township

 

(A)  Construction, renovation, infrastructure and other costs related to the Center for Education and Public Service at Saint Vincent College

 

Project Allocation

7,500,000

(ix)  Upper Burrell

 

(A)  Acquisition, construction and infrastructure improvements for development of a new corporate headquarters for Apogee

 

Project Allocation

2,500,000

(66)  Wyoming County

 

(i)  County Projects

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

2,000,000

(ii)  Factoryville Borough

 

(A)  Construction and other related costs for a new fire station

 

Project Allocation

1,000,000

(B)  Acquisition, infrastructure, renovations, rehabilitation, costs and other costs related to the Factoryville Borough downtown expansion project, including the construction of a new fire company building and the development of additional retail space

 

Project Allocation

3,000,000

(67)  York County

 

(i)  County Projects

 

(A)  Construction, infrastructure and other related costs for the expansion of an existing manufacturing plant

 

Project Allocation

5,000,000

(B)  Infrastructure and other related costs for the construction of a new facility to serve an existing manufacturer

 

Project Allocation

5,000,000

(C)  Construction, infrastructure and other related costs for the Harley-Davidson USA York Facility

 

Project Allocation

25,000,000

(D)  Acquisition, infrastructure, construction and other related costs for a facility for Unilife Medical Solutions

 

Project Allocation

5,000,000

(E)  Acquisition, construction, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

5,000,000

(F)  Construction of capital improvements to improve security in the vicinity of the Lake Marburg dam works

 

Project Allocation

500,000

(G)  Acquisition, infrastructure, renovations, rehabilitation and other costs related to the expansion and redevelopment of property at a market and expo center

 

Project Allocation

7,000,000

(H)  Infrastructure, rehabilitation and other costs related to the York County Government Center renovation project

 

Project Allocation

3,000,000

(I)  Infrastructure, construction and other costs related to the construction of new facilities to house the York County Agriculture and Natural Resource Service Center and other Federal, State and  county agencies serving agriculture within the county

 

Project Allocation

3,500,000

(ii)  York County Economic Development Corporation

 

(A)  Acquisition, infrastructure, renovation, rehabilitation, construction and other costs related to the development of an agricultural support facility

 

Project Allocation

15,000,000

(B)  Acquisition, infrastructure, construction and other costs related to the expansion of the Mason-Dixon Fairgrounds

 

Project Allocation

1,500,000

(ii.1)  City of York

 

(A)  Establishment of a medical equipment facility

 

Project Allocation

10,000,000

(B)  Acquisition, infrastructure, renovation, rehabilitation and other costs related to rehabilitation of blighted buildings and a commercial and retail economic development project

 

Project Allocation

3,000,000

(iii)  Fairview and Newberry Townships

 

(A)  Construction, acquisition and other related costs for a multimunicipality recreation and senior citizen facility

 

Project Allocation

5,000,000

(iv)  Peach Bottom Township

 

(A)  Construction, infrastructure and associated redevelopment costs associated with the building of a new municipal building and public works facility

 

Project Allocation

1,000,000

(iv.1)  Penn Township

 

(A)  Acquisition, infrastructure, renovation, rehabilitation and other costs related to the construction of a new research and development facility at Snyder's of Hanover

 

Project Allocation

10,000,000

(v)  Spring Garden Township

 

(A)  Construction, redevelopment and other related costs for the York College business center and nursing simulation/laboratory wing

 

Project Allocation

7,000,000

(vi)  Spring Grove Borough

 

(A)  Construction, infrastructure and other related costs for a bridge to accommodate vehicles into the Glatfelter Industrial Park

 

Project Allocation

500,000

(68)  Multiple Counties

 

(i)  Allegheny, Beaver, Cambria, Erie, Washington and Westmoreland Counties

 

(A)  Acquisition, infrastructure, construction, redevelopment and other related costs for the Children's Hospital of Pittsburgh of UPMC

 

Project Allocation

15,000,000

(i.1)  Allegheny and Butler Counties

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project servicing individuals with developmental disabilities

 

Project Allocation

1,000,000

(ii)  Allegheny and Westmoreland Counties

 

(A)  Acquisition, renovation, infrastructure, construction and other costs related to a public safety building and community center in Trafford

 

Project Allocation

1,250,000

(B)  Construction, renovation, infrastructure and other costs related to the Trafford Cavitt and 5th Street infrastructure improvement project

 

Project Allocation

1,500,000

(iii)  Allegheny, Westmoreland, Washington, Beaver, Lawrence, Mercer, Cambria, Venango and Fayette Counties

 

(A)  Construction, renovation and upgrades to facilities and technologies in the UPMC Cancer Centers network

 

Project Allocation

18,000,000

(iv)  Beaver, Cambria, Fayette, Lawrence, Mercer and Venango Counties

 

(A)  Construction, renovation and upgrades to facilities and technologies in the UPMC Cancer Centers Network

 

Project Allocation

18,000,000

(v)  Bucks, Delaware, Chester, Montgomery and Philadelphia Counties

 

(A)  Acquisition, clearing, demolition, renovation, environmental remediation, construction, infrastructure, streets, utilities and other costs associated with the relocation and development of a regional corporate headquarters

 

Project Allocation

10,000,000

(B)  Acquisition, clearing, demolition, renovation, environmental remediation, construction, infrastructure, streets, utilities and other costs associated with the relocation and development of a regional corporate headquarters

 

Project Allocation

10,000,000

(v.1)  Columbia, Lancaster, Lebanon, Lehigh, Lycoming, Northampton and York Counties

 

(A)  Acquisition, infrastructure, rehabilitation and other costs related to the renovation and replacement of housing to improve quality of home environment for individuals with mental disabilities

 

Project Allocation

850,000

(v.2)  Cameron, Clearfield, Elk, Jefferson, McKean and Potter Counties

 

(A)  Infrastructure, construction and other related costs for the construction of a carrier independent fiber optic backbone infrastructure system in north central Pennsylvania rural counties

 

Project Allocation

1,000,000

(v.3)  Cameron, Clearfield, Elk, Jefferson, McKean, Potter, Tioga and Warren Counties

 

(A)  Acquisition, infrastructure, renovation, rehabilitation, construction and other related costs for new and existing multitenant industrial buildings

 

Project Allocation

15,000,000

(vi)  Centre, Lackawanna, Luzerne and Montour Counties

 

(A)  Acquisition, construction, infrastructure, redevelopment and other related costs for facilities to deliver medical services, conduct research or provide other related activities for the Geisinger Health System

 

Project Allocation

20,000,000

(vii)  Lehigh and Northampton Counties

 

(A)  Land acquisition, construction, redevelopment and renovations necessary for The Medical School of Temple University and St. Luke's Hospital and Health Network

 

Project Allocation

10,000,000

(viii)  Somerset County and Windber Borough

 

(A)  Construction, renovation and upgrades to facilities and technologies for the Windber Medical Center emergency room and OB/GYN

 

Project Allocation

1,000,000

 

20100082u7s

Section 7.  Itemization of flood control projects.

Additional capital projects in the category of flood control projects to be constructed by the Department of Environmental Protection, its successors or assigns and to be financed by the  incurring of debt are hereby itemized, together with their respective estimated costs, as follows:

Project

Total Project Allocation

(1)  Department of Environmental Protection

 

(i)  Blair County

 

(A)  Completion of the Tyrone Borough Flood Control project, including channel improvements and construction of levees

 

Project Allocation

50,000,000

(i.1)  Cambria County

 

(A)  Construction, infrastructure and costs related to a collapsible dam on the Stoneycreek River

 

Project Allocation

10,000,000

(ii)  Erie County

 

(A)  Acquisition, construction, infrastructure and other related costs for Heidler Road flood relief project in Millcreek Township

 

Project Allocation

1,700,000

(iii)  Luzerne County

 

(A)  Construction and other related costs for Mill Creek flood protection project in Plains Township

 

Project Allocation

2,000,000

(iv)  McKean County

 

(A)  Flood prevention and control project in the City of Bradford, including improvements to the Bolivar Run Stream near Seward Avenue, bridge replacement, acquisition, infrastructure, construction and other related costs

 

Project Allocation

1,500,000

(iv.1)  Montgomery County

 

(A)  Provide flood protection along Tacony Creek in the Glenside area and replace SEPTA bridge with wider version in Townships of Cheltenham and Abington

 

Project Allocation

6,000,000

(Base Project Allocation - $5,000,000)

 

(Design and Contingencies - $1,000,000)

 

(B)  Construction, infrastructure and other costs related to the Glenside area flood protection project, Phase II, in the Township of Cheltenham along the Tookany Creek

 

Project Allocation

3,500,000

(C)  Construction, infrastructure and other costs related to the Narcissa Road culvert

 

Project Allocation

400,000

(D)  Construction, infrastructure and other costs related to the Garrison Way drainage improvement project, grading modifications and installation of culverts between the Radnor Township line to Joel Drive

 

Project Allocation

320,000

(E)  Infrastructure, construction and other costs related to the Whitemarsh flood remediation project, including construction and installation of a storm sewer system and storm water detention basin

 

Project Allocation

1,500,000

(F)  Land acquisition and redevelopment of Cisco Park to restore the natural floodplain

 

Project Allocation

1,125,000

(v)  Northumberland County

 

(A)  Construction and infrastructure costs related to stream bank improvement and habitat improvement in Lower Augusta Township

 

Project Allocation

100,000

(vi)  Schuylkill County

 

(A)  Construction of a detention basin and other related costs for the Schuylkill Haven flood control project in Schuylkill Haven Borough

 

Project Allocation

2,000,000

(vii)  Venango County

 

(A)  Engineering, site planning, infrastructure, construction and other costs related to the installation of an ice boom for the City of Oil City flood control and mitigation project

 

Project Allocation

300,000

20100082u8s

Section 8.  Itemization of Keystone Recreation, Park and Conservation Fund projects.

Projects in the category of public improvement projects to be constructed by the Department of Conservation and Natural Resources, its successors or assigns and to be financed by current revenues of the Keystone Recreation, Park and Conservation Fund are hereby itemized, together with their respective estimated costs, as follows:

Project

Total Project Allocation

(1)  Department of Conservation and Natural Resources

 

(i)  Beltzville State Park

 

(A)  Repair sewer line infiltration and rehabilitate sewage treatment plant

 

Project Allocation

650,000

(ii)  Buchanan State Forest

 

(A)  Construct Buchanan Resource Management Center

 

Project Allocation

3,500,000

(iii)  Caledonia State Park

 

(A)  Rehabilitate campgrounds within the park

 

Project Allocation

1,300,000

(iv)  Codorus State Park

 

(A)  Construct new marina pier

 

Project Allocation

300,000

(v)  Cook Forest State Park

 

(A)  Replace park office and visitors center

 

Project Allocation

3,000,000

(vi)  Erie Bluffs State Park

 

(A)  Refurbish CXT latrine and parking area

 

Project Allocation

500,000

(vii)  Forbes State Forest

 

(A)  Rehabilitate Linn Run Road within the park

 

Project Allocation

2,700,000

(viii)  French Creek State Park

 

(A)  Replace sewage lift stations

 

Project Allocation

300,000

(ix)  Gouldsboro State Park

 

(A)  Construct dam, Phase 2, within the park

 

Project Allocation

400,000

(x)  Keystone State Park

 

(A)  Rehabilitate maintenance area within the park

 

Project Allocation

300,000

(xi)  Lackawanna State Forest

 

(A)  Remove Rush Brook Dam

 

Project Allocation

200,000

(xii)  Lackawanna State Park

 

(A)  Rehabilitate pool complex and day use area, including renovation of bathhouses and adding space for a lifeguard and first aid station

 

Project Allocation

3,000,000

(xiii)  Laurel Hill State Park

 

(A)  Rehabilitate water line to group camp number 1

 

Project Allocation

300,000

(xiv)  Linn Run State Park

 

(A)  Rehabilitate Laurel Summit area

 

Project Allocation

200,000

(xv)  Little Pine State Park

 

(A)  Rehabilitate shooting range

 

Project Allocation

300,000

(xvi)  Loyalsock State Forest

 

(A)  Rehabilitate Hillsgrove Ranger Station and equipment storage shed

 

Project Allocation

325,000

(xvii)  Moraine State Park

 

(A)  Rehabilitate Old 422 launch within the park

 

Project Allocation

250,000

(B)  Rehabilitate sewage and collection conveyance system

 

Project Allocation

300,000

(C)  Rehabilitate sewage treatment plant to current standards and technology

 

Project Allocation

3,500,000

(xviii)  Nescopeck State Park

 

(A)  Construct culvert to replace current dam spillway

 

Project Allocation

650,000

(xix)  Nockamixon State Park

 

(A)  Modify sewage treatment plant, including reactor configuration and contact tank modifications

 

Project Allocation

300,000

(xx)  Ohiopyle State Park

 

(A)  Replace Bridges 0914 CSX 2342 and 0936 CSX 2445

 

Project Allocation

550,000

(B)  Rehabilitate Ferncliff RRM and parking

 

Project Allocation

1,100,000

(C)  Replace superstructure Bridge 0901, Bruner Run Bridge

 

Project Allocation

400,000

(xxi)  Pine Grove Furnace State Park

 

(A)  Renovate swimming area at Fuller Lake

 

Project Allocation

300,000

(xxii)  Presque Isle State Park

 

(A)  Rehabilitate breakwall

 

Project Allocation

400,000

(B)  Finish sand mound replacement at Beaches 10 and 11 and the Stull Center

 

Project Allocation

300,000

(xxiii)  Prince Gallitzin State Park

 

(A)  Rehabilitate Beaver Valley Marina

 

Project Allocation

3,000,000

(xxiv)  Promised Land State Park

 

(A)  Rehabilitate Pickers Point/Deerfield Campgrounds

 

Project Allocation

3,000,000

(B)  Repair Lower Lake Dam/Bridge 802

 

Project Allocation

3,700,000

(xxv)  Pymatuning State Park

 

(A)  Renovate Jamestown beach house

 

Project Allocation

250,000

(xxvi)  Reeds Gap State Park

 

(A)  Replace swimming pool with camping cottage colon

 

Project Allocation

500,000

(xxvii)  Ricketts Glen State Park

 

(A)  Rehabilitate roads and parking lots throughout the park

 

 

Project Allocation

1,300,000

(xxviii)  Salt Springs State Park

 

(A)  Replace existing vault toilet with new comfort station, including infrastructure

 

Project Allocation

300,000

(xxix)  Shawnee State Park

 

(A)  Pave areas near and around campgrounds

 

Project Allocation

250,000

(xxx)  Shikellamy State Park

 

(A)  Construct permanent causeway

 

Project Allocation

1,500,000

(B)  Replace Bags 6 and 7 and construct permanent causeway

 

Project Allocation

3,000,000

(xxxi)  Sinnemahoning State Park

 

(A)  Refurbish restroom on the wildlife viewing trail

 

Project Allocation

600,000

(xxxii)  Sproul State Forest

 

(A)  Pave Young Woman's Creek Road within the park

 

Project Allocation

350,000

(B)  Rehabilitate Baker's Run canoe access and Baker's horse trail

 

Project Allocation

500,000

(C)  Rehabilitate Bloody Skillet - Beech Creek/Two Rock ATV Bridge

 

Project Allocation

1,000,000

(D)  Construct horse trailer and parking/camping at Baker's Run

 

Project Allocation

300,000

(xxxiii)  Tiadaghton State Forest

 

(A)  Rehabilitate Trout Run Road embankment slide

 

Project Allocation

1,000,000

(B)  Rehabilitate Tomb Flats Boat Launch and construct camping sites and restroom

 

Project Allocation

300,000

(xxxiv)  Tioga State Forest

 

(A)  Upgrade Pine Creek Trail, including trail extension, parking lot and Route 287 at-grade crossing with paved approaches and warning flashers

 

Project Allocation

300,000

(xxxv)  Tuscarora State Forest

 

(A)  Improve infrastructure services at Bryner House

 

Project Allocation

1,500,000

(xxxvi)  Weiser State Forest

 

(A)  Improve SR 42 entrance, parking and comfort station

 

Project Allocation

400,000

(xxxvii)  Yellow Creek State Park

 

(A)  Rehabilitate Camp Seph Mack, Phase 1

 

Project Allocation

800,000

(xxxviii)  Various Forest Districts, Statewide

 

(A)  Inspect, repair and replace 47 fire towers

 

Project Allocation

2,650,000

20100082u9s

Section 9.  Itemization of Environmental Stewardship Fund projects.

Projects in the category of public improvement projects to be constructed by the Department of Conservation and Natural Resources, its successors or assigns and to be financed by current revenues of the Environmental Stewardship Fund are hereby itemized together with their respective estimated financial costs as follows:

Project

Total Project Allocation

(1)  Department of Conservation and Natural Resources

 

 

(i)  Black Moshannon State Park

 

(A)  Rehabilitate dam spillway

 

Project Allocation

400,000

(B)  Rehabilitate three boat launches

 

Project Allocation

250,000

(ii)  Codorus State Park

 

(A)  Replace swimming pool and renovate bathhouse interior

 

 

Project Allocation

2,500,000

(iii)  Delaware Canal State Park

 

(A)  Replace Ferry Street Bridge

 

Project Allocation

500,000

(B)  Rehabilitate Smithtown 5 and Upper Limeport Bridges

 

Project Allocation

650,000

(C)  Replace bridges at Odette's

 

Project Allocation

650,000

(iv)  Delaware State Forest

 

(A)  Construct Delaware State Forest Resource Management Center

 

Project Allocation

3,500,000

(v)  Elk State Forest

 

(A)  Construct Elk Scenic Drive pull-off consisting of viewing platform, parking, kiosk and restrooms

 

Project Allocation

300,000

(vi)  Evansburg State Park

 

(A)  Replace sewer lines within the park

 

Project Allocation

480,000

(vii)  Frances Slocum State Park

 

(A)  Rehabilitate sewage treatment plant and infiltration

 

Project Allocation

1,500,000

(viii)  Hickory Run State Park

 

(A)  Replace pit latrines (OGT and CG) with modern comfort stations

 

Project Allocation

2,200,000

(ix)  Ohiopyle State Park

 

(A)  Rehabilitate Bridge 0927, Jonathan Run culvert

 

Project Allocation

1,500,000

(x)  Ricketts Glen State Park

 

(A)  Rehabilitate sewage treatment plant and water system

 

Project Allocation

550,000

(xi)  Shawnee State Park

 

(A)  Rehabilitate water treatment plant

 

Project Allocation

1,200,000

(xii)  Tiadaghton State Forest

 

(A)  Construct Black Forest Trail suspension bridge

 

Project Allocation

370,000

(xiii)  Weiser State Forest

 

(A)  Construct Weiser Resource Management Center

 

Project Allocation

3,500,000

20100082u10s

Section 10.  Itemization of State forestry bridge projects.

Projects in the category of State forestry bridge projects to be constructed by the Department of Conservation and Natural Resources, its successors or assigns and to be financed by oil company franchise tax revenues pursuant to 75 Pa.C.S. § 9502(a)(2)(iv) (relating to imposition of tax) are hereby itemized, together with their respective estimated costs, as follows:

Project

Total Project Allocation

(1)  Cameron County

 

(i)  Elk State Forest

 

(A)  Replace entrance bridge to lodge over Brooks Run, including guide rails and approach work

 

Project Allocation

300,000

(B)  Replace Dents Run Road over Bear Hollow, Weatherbord Run 13-9006

 

Project Allocation

500,000

(2)  Clearfield County

 

(i)  Moshannon State Forest

 

(A)  Replace Meyers Run Road over Black Moshannon Creek

 

Project Allocation

450,000

(B)  Replace North Run Road over Smays Run

 

Project Allocation

300,000

(C)  Replace Little Medix Road over Little Medix Run, Bridge 9-0012

 

Project Allocation

300,000

(D)  Replace Little Medix Road over Little Medix Run, Culverts 9-0013, 9-0014 and 9-0016

 

Project Allocation

400,000

(E)  Replace Shirks Road over Black Moshannon Creek Bridge 9-0028

 

Project Allocation

300,000

(F)  Replace structures for Bridge 9-9015 Meyers Run Road/Black Moshannon Creek and Bridge 9-0028 Shirks Road/Black Moshannon Creek

 

Project Allocation

900,000

(G)  Replace structures for Bridge 9-0012 Little Medix Road over Medix Run and Bridges 9-0013, 9-0014 and 9-0016 Little Medix Road over Little Medix Run

 

Project Allocation

1,400,000

(H)  Replace structures for North Run Road over Smays Run and Smays Trail over tributary of Smays Run

 

Project Allocation

400,000

(I)  Replace Reservoir Road over Upper Three Run

 

Project Allocation

300,000

(3)  Clinton County

 

(i)  Sproul State Forest

 

(A)  Replace Mill Run Road bridge over Mill Run, Bridge 10-0046

 

Project Allocation

325,000

(B)  Replace Mill Run Road over Mill Run, Bridge 10-0046

 

Project Allocation

300,000

(C)  Replace Birch Island Road over Amos Branch, Bridge 10-0040

 

Project Allocation

300,000

(4)  Franklin County

 

(i)  Michaux State Forest

 

(A)  Replace Biesecker Gap Road bridge over Biesecker Run

 

Project Allocation

200,000

(5)  Huntingdon County

 

(i)  Rothrock State Forest

 

(A)  Replace Lingle Valley Road bridge over Laurel Creek

 

Project Allocation

300,000

(B)  Rehabilitate three bridges, Pine Swamp Road over Laurel and Little Shingletown Runs

 

Project Allocation

450,000

(C)  Replace superstructure and rehabilitate abutments on Structure 5-0026, Pennsylvania Furnace Road over Fowlers Run

 

Project Allocation

300,000

(D)  Replace bridges, Diamond Valley Road over Globe Run, Bridges 5-0023 and 5-0024

 

Project Allocation

400,000

(6)  Lycoming County

 

(i)  Tiadaghton State Forest

 

(A)  Replace Trout Run Bridge over First Big Fork

 

Project Allocation

250,000

(B)  Replace Trout Run Bridge over Second Big Fork

 

 

Project Allocation

250,000

(C)  Replace Trout Run Bridge over first unnamed tributary, Bridge 9027

 

Project Allocation

250,000

(D)  Replace Trout Run Bridge over second unnamed tributary, Bridge 9027

 

Project Allocation

250,000

(E)  Replace roadway for Trout Run Road/First Big Fork 12-0043 and Second Big Fork 12-0044 and improve roadway

 

Project Allocation

680,000

(F)  Replace Zinck Fork Road over tributary of Browns Run and Upper Pine

 

Project Allocation

300,000

(G)  Replace Zinck Fork Road over Upper Pine Bottom

 

Project Allocation

300,000

(7)  Perry County

 

(i)  Tuscarora State Forest

 

(A)  Replace Second Narrows Road bridge over Conocochegue Creek, Bridge 3-0001

 

Project Allocation

300,000

(B)  Replace bridge on Pine Ridge Road over Spruce Run, Bridge 3-0004

 

Project Allocation

300,000

(8)  Potter County

 

(i)  Susquehannock State Forest

 

(A)  Replace old culvert on Long Toe Road over Prouty Run

 

Project Allocation

300,000

(9)  Schuylkill County

 

(i)  Weiser State Forest

 

(A)  Replace Lykens Road/West Branch Rattling Creek, Bridge 18-0002

 

Project Allocation

300,000

20100082u11s

Section 11.  Itemization of General Fund current revenue projects.

The individual capital projects in the category of public improvement projects to be constructed or acquired by the Department of General Services, its successors or assigns and to be financed from General Fund current revenues are hereby itemized, together with their respective estimated financial costs, as follows:

Project

Total Project Allocation

(1)  Department of Corrections

 

(i)  State Correctional Institution at Dallas

 

(A)  Lease and/or purchase an emergency housing facility along with related infrastructure improvements

 

Project Allocation

3,500,000

(Base Project Allocation - $3,500,000)

 

(ii)  State Correctional Institution at Forest

 

(A)  Lease and/or purchase an emergency housing facility along with related infrastructure improvements

 

Project Allocation

3,500,000

(Base Project Allocation - $3,500,000)

 

(iii)  State Correctional Institution at Mercer

 

(A)  Lease and/or purchase an emergency housing facility along with related infrastructure improvements

 

Project Allocation

3,500,000

(Base Project Allocation - $3,500,000)

 

(iv)  State Correctional Institution at Rockview

 

(A)  Lease and/or purchase an emergency housing facility along with related infrastructure improvements

 

Project Allocation

3,500,000

(Base Project Allocation - $3,500,000)

 

(v)  State Correctional Institution at Somerset

 

(A)  Lease and/or purchase an emergency housing facility along with related infrastructure improvements

 

Project Allocation

3,500,000

(Base Project Allocation - $3,500,000)

 

(2)  Department of Education

 

(i)  Thaddeus Stevens College of Technology

 

(A)  Expand Jones Dining Hall, remodel kitchen area, construct connection to Hartzell Instructional Center and expand Hartzell Instructional Center to include a second floor

 

Project Allocation

5,750,000

(Base Project Allocation - $5,060,000)

 

(Design and Contingencies - $690,000)

 

(3)  Pennsylvania Historical and Museum Commission

 

(i)  Landis Valley Museum

 

(A)  Replace HVAC system to collections gallery with geothermal HVAC system and associated equipment, duct modification and new controls

 

Project Allocation

900,000

(Base Project Allocation - $720,000)

 

(Design and Contingencies - $180,000)

 

20100082u12s

Section 12.  Itemization of State ATV/Snowmobile Fund current revenue projects.

Projects in the category of State ATV/Snowmobile Fund projects to be constructed by the Department of Conservation and Natural Resources, its successors or assigns and to be financed from State ATV/Snowmobile Fund current revenue are hereby itemized, together with their respective estimated costs as follows:

Project

Total Project Allocation

(1)  Lackawanna County

 

(i)  Lackawanna State Forest

 

(A)  Construct Carvolth Snowmobile Trail

 

Project Allocation

300,000

20100082u13s

Section 13.  Itemization of State Transportation Enhancement Funds current revenue projects.

Projects in the category of State Transportation Enhancement Funds projects to be constructed by the Department of Conservation and Natural Resources, its successors or assigns and to be financed from State Transportation Enhancement Funds current revenue are hereby itemized together with their respective costs as follows:

Project

Total Project Allocation

(1)  Bucks County

 

(i)  Delaware Canal State Park

 

(A)  Construct Conrail embankment tunnel for the canal towpath

 

Project Allocation

1,000,000

(B)  Construct a Route 13 bridge for the canal towpath

 

Project Allocation

1,600,000

(C)  Replace Yardley aqueduct to meet current standards

 

Project Allocation

2,400,000

20100082u14s

Section 14.  Itemization of State Stores Fund current revenue projects.

The individual capital projects in the category of public improvement projects to be developed by the Department of General Services, its successors or assigns for the Pennsylvania Liquor Control Board and to be financed from current revenues of the State Stores Fund are hereby itemized, together with their respective itemized costs, as follows:

Project

Total Project Allocation

(1)  Pennsylvania Liquor Control Board

 

(i)  Northwest Office Building

 

(A)  Upgrade alarm system, including replacing existing alarm system

 

Project Allocation

552,000

(Base Project Allocation - $460,000)

 

(Design and Contingencies - $92,000)

 

20100082u15s

Section 15.  Debt authorization.

(a)  Public improvements.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time, in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $3,839,809,000 as may be found necessary to carry out the acquisition and construction of the public improvement projects specifically itemized in a capital budget.

(b)  Furniture and equipment.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time, in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $194,321,000 as may be found necessary to carry out the acquisition and construction of the public improvement projects consisting of the acquisition of original movable furniture and equipment specifically itemized in a capital budget.

(c)  Transportation assistance.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time, in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of  $1,041,742,500 as may be found necessary to carry out the acquisition and construction of the transportation assistance projects specifically itemized in a capital budget.

(d)  Redevelopment assistance.--Subject to the limitation in section 317(b) of the act of February 9, 1999 (P.L.1, No.1), known as the Capital Facilities Debt Enabling Act, the Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time, in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $7,375,792,000 as may be found necessary to carry out the redevelopment assistance capital projects specifically itemized in a capital budget.

(e)  Flood control.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time, in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $80,445,000 as may be found necessary to carry out the acquisition and construction of the flood control projects specifically itemized in a capital budget.

20100082u16s

Section 16.  Issue of bonds.

The indebtedness authorized in this act shall be incurred from time to time and shall be evidenced by one or more series of general obligation bonds of the Commonwealth in such aggregate principal amount for each series as the Governor, the Auditor General and the State Treasurer shall determine, but the latest stated maturity date shall not exceed the estimated useful life of the projects being financed as stated in section 17.

20100082u17s

Section 17.  Estimated useful life and term of debt.

(a)  Estimated useful life.--The General Assembly states that the estimated useful life of the public improvement projects itemized in this act is as follows:

(1)  Public improvement projects, 30 years.

(2)  Furniture and equipment projects, 10 years.

(3)  Transportation assistance projects:

(i)  Rolling stock, 15 years.

(ii)  Passenger buses, 12 years.

(iii)  Furniture and equipment, 10 years.

(iv)  All others, 30 years.

(b)  Term of debt.--The maximum term of the debt authorized to be incurred under this act is 30 years.

20100082u18s

Section 18.  Appropriations.

(a)  Public improvements.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of General Services in the maximum amount of $3,839,809,000 to be used by it exclusively to defray the financial cost of the public improvement projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of General Services the moneys as required and certified by it to be legally due and payable.

(b)  Furniture and equipment.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of General Services in the maximum amount of $194,321,000 to be used by it exclusively to defray the financial cost of the public improvement projects consisting of the acquisition of original movable furniture and equipment specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of General Services the moneys as required and certified by it to be legally due and payable.

(c)  Transportation assistance.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Transportation in the maximum amount of $1,041,742,500 to be used by it exclusively to defray the financial cost of the transportation assistance projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of Transportation the moneys as required and certified by it to be legally due and payable.

(d)  Redevelopment assistance.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Community and Economic Development in the maximum amount of  $7,375,792,000 to be used by it exclusively to defray the financial cost of the redevelopment assistance capital projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of Community and Economic Development the moneys as required and certified by it to be legally due and payable.

(e)  Flood control.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Environmental Protection in the maximum amount of $80,445,000 to be used by it exclusively to defray the financial cost of the flood control projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of Environmental Protection the moneys as required and certified by it to be legally due and payable.

20100082u19s

Section 19.  Federal funds.

(a)  Projects itemized in this act.--In addition to those funds appropriated in section 18, all moneys received from the Federal Government for the projects specifically itemized in this act are also hereby appropriated for those projects.

(b)  Projects not requiring itemization.--Department of Military and Veterans Affairs construction projects which are totally federally funded but which are to be administered by the Department of General Services are hereby authorized.

20100082u20s

Section 20.  Additional allocation for redevelopment assistance

for housing.

In addition to the allocation under section 317(c) of the act of February 9, 1999 (P.L.1, No.1), known as the Capital Facilities Debt Enabling Act, an additional $25,000,000 may be used for the construction of housing units.

20100082u20.1s

Section 20.1.  Repeals.

Repeals are as follows:

(1)  The General Assembly declares that the repeal under paragraph (2) is necessary to effectuate the provisions of this act.

(2)  Section 6(7)(iii)(B) and (31)(iv)(B) of the act of July 4, 2008 (P.L.329, No.41), known as the Capital Budget Project Itemization Act of 2007-2008, is repealed.

20100082u21s

Section 21.  Delegation.

Notwithstanding any provision of law to the contrary, the Department of General Services may delegate the design and construction of the project contained in section 3(5)(iii)(A) of the act of July 4, 2008 (P.L.329, No.41), known as the Capital Budget Project Itemization Act of 2007-2008, to the University of Pennsylvania.

20100082u22s

Section 22.  Editorial changes.

In editing and preparing this act for printing following the final enactment, the Legislative Reference Bureau shall insert or revise letters or numbers for projects where the letters or numbers are missing or require revision. The bureau shall also revise the total monetary amounts for the total authorization, debt authorization, appropriations and departmental totals as necessary to agree with the total monetary amounts of the projects.

20100082u23s

Section 23.  Effective date.

This act shall take effect immediately.