See other bills
under the
same topic
PRINTER'S NO. 1157
THE GENERAL ASSEMBLY OF PENNSYLVANIA
SENATE BILL
No.
915
Session of
2021
INTRODUCED BY BROWNE, OCTOBER 18, 2021
REFERRED TO APPROPRIATIONS, OCTOBER 18, 2021
AN ACT
Providing for the capital budget for fiscal year 2021-2022;
itemizing public improvement projects, furniture and
equipment projects, transportation assistance, redevelopment
assistance projects, flood control projects and Pennsylvania
Fish and Boat Commission projects leased or assisted by the
Department of General Services and other State agencies,
together with their estimated financial costs; authorizing
the incurring of debt without the approval of the electors
for the purpose of financing the projects to be constructed,
acquired or assisted by the Department of General Services
and other State agencies; authorizing the use of current
revenue for the purpose of financing the projects to be
constructed, acquired or assisted by the Department of
General Services and other State agencies stating the
estimated useful life of the projects; and making
appropriations.
The General Assembly of the Commonwealth of Pennsylvania
hereby enacts as follows:
Section 1. Short title.
This act shall be known and may be cited as the Capital
Budget Project Itemization Act of 2021-2022.
Section 2. Total authorizations.
(a) Public improvements.--The total authorization for the
additional capital projects in the category of public
improvement projects itemized in section 3 and to be acquired or
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
constructed by the Department of General Services, its
successors or assigns, and to be financed by the incurring of
debt shall be $6,204,946,595.
(b) Furniture and equipment.--The total authorization for
the additional capital projects in the category of public
improvement projects consisting of the acquisition of original
movable furniture and equipment to complete public improvement
projects itemized in section 4 and to be acquired by the
Department of General Services, its successors or assigns, and
to be financed by the incurring of debt shall be $276,739,190.
(c) Transportation assistance.--The total authorization for
the capital projects in the category of transportation
assistance projects itemized in section 5 with respect to which
an interest is to be acquired in or constructed by the
Department of Transportation, its successors or assigns and to
be financed by the incurring of debt shall be $148,425,000.
(d) Redevelopment assistance.--The total authorization for
the capital projects in the category of redevelopment capital
projects itemized in section 6 for capital grants by the
Department of Community and Economic Development, its successors
or assigns and to be financed by the incurring of debt shall be
$2,806,375,000.
(e) Flood control.--The total authorization for the capital
projects in the category of flood control projects itemized in
section 7 and to be constructed by the Department of
Environmental Protection, its successors or assigns and to be
financed by the incurring of debt shall be $63,227,000.
(f) Fish Fund and Boat Fund.--The total authorization for
the capital projects in the category of public improvement
projects itemized in section 8 to be acquired or developed by
20210SB0915PN1157 - 2 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
the Pennsylvania Fish and Boat Commission and to be financed by
the incurring of debt or by current revenues of the Fish Fund
and the Boat Fund pursuant to executive authorization shall be
$111,130,000.
Section 3. Itemization of public improvement capital projects.
Additional capital projects in the category of public
improvement projects to be acquired or constructed by the
Department of General Services, its successors or assigns, and
to be financed by the incurring of debt, are hereby itemized,
together with their respective estimated financial costs, as
follows:
Project
Total Project
Allocation
(1) Department of Agriculture
(i) Farm Show Complex
(A) Renovation of the underground
(Cameron Street) pedestrian/cyclist
walk from Department of Agriculture to
the Farm Show Complex and associated
pathways
Project Allocation 3,000,000
(ii) Samuel E. Hayes Jr. Livestock Evaluation
Center
(A) Renovations to the Livestock
Evaluation Center
Project Allocation 2,000,000
(2) Department of Conservation and Natural
Resources
(i) Clear Creek Forest District
(A) New Maintenance Shop and equipment
20210SB0915PN1157 - 3 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
storage
Project Allocation 4,000,000
(ii) Cornplanter Forest District
(A) Office renovation
Project Allocation 3,000,000
(iii) Delaware State Forest
(A) Lilly Pond Dam Spillway repair/
replacement
Project Allocation 1,350,000
(iv) Norristown Farm Park
(A) Replace multiple vehicular and
pedestrian bridges
Project Allocation 6,250,000
(v) Pinchot State Forest
(A) Remove Turtle Creek Dam
Project Allocation 1,875,000
(vi) Pinchot Forest District
(A) Remove Race Run Dam
Project Allocation 2,000,000
(B) Remove Dam 148-118 SGL 260
Project Allocation 2,000,000
(vii) Tiadaghton & Tioga Forest Districts
(A) Pine Creek Rail Trail-truss bridges
over Pine Creek
Project Allocation 6,700,000
(viii) Various State Parks - Statewide
(A) Campground facility amenities -
construct washhouses, including
utility and site work
Project Allocation 12,500,000
20210SB0915PN1157 - 4 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(ix) Bureau of Forestry
(A) New Regional Air Operations
facilities
Project Allocation 9,600,000
(B) New Fire Cache/Forestry warehouse -
replace main building
Project Allocation 7,200,000
(3) Department of Corrections
(i) Elizabethtown Training Facility
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 3,982,700
(ii) Quehanna Boot Camp
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 2,793,000
(iii) State Correctional Institution at
Albion
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 4,362,000
20210SB0915PN1157 - 5 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(iv) State Correctional Institution at Benner
(A) Design and construction of a
transportation hub, including land
development and site infrastructure
improvements
Project Allocation 3,000,000
(B) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 5,933,490
(v) State Correctional Institution at
Cambridge Springs
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 15,354,000
(vi) State Correctional Institution at Camp
Hill
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 37,425,000
(vii) State Correctional Institution at
Chester
20210SB0915PN1157 - 6 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 6,848,000
(viii) State Correctional Institution at Coal
Township
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 12,567,000
(ix) State Correctional Institution at Dallas
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 1,657,000
(x) State Correctional Institution at Fayette
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 15,679,200
(xi) State Correctional Institution at Forest
(A) Design and construction of building
20210SB0915PN1157 - 7 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 14,394,000
(xii) State Correctional Institution at
Frackville
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 6,397,900
(xiii) State Correctional Institution at
Graterford
(A) Design and construction of code,
permit and
site/utility/infrastructure-related
issues
Project Allocation 650,000
(xiv) State Correctional Institution at
Greene
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 7,462,000
(xv) State Correctional Institution at
Houtzdale
20210SB0915PN1157 - 8 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 11,897,500
(xvi) State Correctional Institution at
Huntingdon
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 14,292,350
(xvii) State Correctional Institution at
Laurel Highlands
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 6,738,300
(xviii) State Correctional Institution at
Mahanoy
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 20,493,500
20210SB0915PN1157 - 9 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(xix) State Correctional Institution at
Mercer
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 7,908,500
(xx) State Correctional Institution at Muncy
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 14,342,980
(xxi) State Correctional Institution at Pine
Grove
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 8,596,000
(xxii) State Correctional Institution at
Retreat
(A) Design and construction of facility
upgrades, including land development
and site infrastructure improvements,
and new construction
Project Allocation 1,500,000
20210SB0915PN1157 - 10 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(xxiii) State Correctional Institution at
Rockview
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 10,131,000
(xxiv) State Correctional Institution at
Smithfield
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 8,375,270
(xxv) State Correctional Institution at
Somerset
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 8,403,610
(xxvi) State Correctional Institution at
Waymart
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
20210SB0915PN1157 - 11 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
infrastructure improvements
Project Allocation 19,787,295
(4) Department of Education
(i) Department of Education Headquarters
(Reserved)
(ii) Lincoln University
(A) Infrastructure replacement, upgrade
and improvements
Project Allocation 16,000,000
(B) Renovation of Houston Hall
Project Allocation 12,000,000
(iii) The Pennsylvania State University
(A) Davey Laboratory Renovation
(University Park Campus) design,
construction (new space or addition to
and/or renovation of existing space;
including demolition, abatement of
hazardous materials, extensions and/or
upgrading of utilities and other
infrastructure needs) and other
related costs for Davey Laboratory at
the University Park campus. The
project scope includes building
systems renewal, including mechanical,
electrical, plumbing and sprinkler
systems and code upgrades. Funding
will be used for both design and
construction costs, as well as
necessary utility upgrades and
extensions, site improvements and
20210SB0915PN1157 - 12 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes
Project Allocation 100,000,000
(B) Osmond Laboratory Renovation - Phase
II (University Park Campus) design,
construction (new space or addition to
and/or renovation of existing space;
including demolition, abatement of
hazardous materials, extensions and/or
upgrading of utilities and other
infrastructure needs) and other
related costs for Phase II of Osmond
Laboratory at the University Park
campus. This project will complete the
renovation of Osmond Laboratory. The
project will renew the remainder of
facility by replacing worn systems,
improving the thermal envelope,
replacing windows and interior
finishes. Interior space modifications
will be made to meet the needs of the
departments and activities currently
housed there and into the future.
20210SB0915PN1157 - 13 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Funding will be used for both design
and construction costs, as well as
necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes
Project Allocation 40,000,000
(C) Carpenter Building Renovation
(University Park Campus) design,
construction (new space or addition to
and/or renovation of existing space;
including demolition, abatement of
hazardous materials, extensions and/or
upgrading of utilities and other
infrastructure needs) and other
related costs for the Carpenter
Builder at the University Park campus.
Carpenter Building requires building
wide renewal to include building, life
safety system and accessibility
upgrades. The project includes
building systems and envelope
renewal/replacement. Funding will be
20210SB0915PN1157 - 14 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
used for both design and construction
costs, as well as necessary utility
upgrades and extensions, site
improvements and code-related
upgrades. All costs for both occupant
and program relocation or interim
facilities will be included. The
construction will both meet all
current building code requirements and
provide for barrier-free access as
required by the Americans with
Disabilities Act and related codes
Project Allocation 35,000,000
(D) Student Support and Services Center
(University Park Campus) design,
construction (new space or addition to
and/or renovation of existing space;
including demolition, abatement of
hazardous materials, extensions and/or
upgrading of utilities and other
infrastructure needs) and other
related costs for a Student Support
and Services Center at the University
Park campus. A new multistory building
will be constructed to provide
functional spaces for student support
and engagement, admissions and
administration. Funding will be used
for both design and construction
costs, as well as necessary utility
20210SB0915PN1157 - 15 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
upgrades and extensions, site
improvements and code-related
upgrades. All costs for both occupant
and program relocation or interim
facilities will be included. The
construction will both meet all
current building code requirements and
provide for barrier-free access as
required by the Americans with
Disabilities Act and related codes
Project Allocation 90,000,000
(E) Electrical Engineering West
Renovation (University Park Campus)
design, construction (new space or
addition to and/or renovation of
existing space; including demolition,
abatement of hazardous materials,
extensions and/or upgrading of
utilities and other infrastructure
needs) and other related costs for
Electrical Engineering West at the
University Park campus. This project
addresses the continuing needs of the
College of Engineering. The project
scope includes buildingwide systems
renewal, including mechanical,
electrical, plumbing and sprinkler
systems to improve efficiency and
performance. The building exterior
improvements include masonry repair,
20210SB0915PN1157 - 16 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
roof and window replacement. Funding
will be used for both design and
construction costs, as well as
necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes
Project Allocation 65,000,000
(F) Electrical Engineering East
Renovation (University Park Campus)
design, construction (new space or
addition to and/or renovation of
existing space; including demolition,
abatement of hazardous materials,
extensions and/or upgrading of
utilities and other infrastructure
needs) and other related costs for
Electrical Engineering East at the
University Park campus. This project
addresses the continuing needs of the
College of Engineering. The project
scope includes building systems
renewal, including mechanical,
20210SB0915PN1157 - 17 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
electrical, plumbing and fire
suppression systems to improve
efficiency and performance. The
building exterior improvements include
glazing, curtain wall and door
replacement. Interior and
accessibility improvements are needed.
Funding will be used for both design
and construction costs, as well as
necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes
Project Allocation 45,000,000
(G) Pattee Library/Paterno Library
Renovation (University Park Campus)
design, construction (new space or
addition to and/or renovation of
existing space; including demolition,
abatement of hazardous materials,
extensions and/or upgrading of
utilities and other infrastructure
needs) and other related costs for
20210SB0915PN1157 - 18 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Pattee Library/Paterno Library at the
University Park campus. This project
will address aging systems,
accessibility concerns, reliability
issues and safety concerns. Funding
will be used for both design and
construction costs, as well as
necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes
Project Allocation 60,000,000
(H) Sparks Building Renovation
(University Park Campus) design,
construction (new space or addition to
and/or renovation of existing space;
including demolition, abatement of
hazardous materials, extensions and/or
upgrading of utilities and other
infrastructure needs) and other
related costs for the Sparks Building
at the University Park campus. The
project will include building system
20210SB0915PN1157 - 19 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
and envelope renewal and renovation to
address programmatic and system needs.
Funding will be used for both design
and construction costs, as well as
necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes
Project Allocation 65,000,000
(I) Applied Research Laboratory
Renovation (University Park Campus)
design, construction (new space or
addition to and/or renovation of
existing space; including demolition,
abatement of hazardous materials,
extensions and/or upgrading of
utilities and other infrastructure
needs) and other related costs for the
Applied Research Laboratory at the
University Park campus. The ARL
Building requires building wide
renewal to include building systems
and envelope renewal/replacement. The
20210SB0915PN1157 - 20 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
project scope also includes life
safety system and accessibility
upgrades. Funding will be used for
both design and construction costs, as
well as necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes
Project Allocation 50,000,000
(J) Capital Renewal, Phase X (University
Park Campus) design, construction (new
space or addition to and/or renovation
of existing space; including
demolition, abatement of hazardous
materials, extensions and/or upgrading
of utilities and other infrastructure
needs) and other related costs for
Capital Renewal, Phase X at the
University Park campus. This project
will allow the University to replace,
install or upgrade as appropriate
systems in major academic, research
and administrative buildings across
20210SB0915PN1157 - 21 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
campus that were not addressed in the
other phases of renewal. Funding will
be used for both design and
construction costs, as well as
necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes
Project Allocation 40,000,000
(K) Chilled Water Plant (University Park
Campus) design, construction (new
space or addition to and/or renovation
of existing space; including
demolition, abatement of hazardous
materials, extensions and/or upgrading
of utilities and other infrastructure
needs) and other related costs for a
Chilled Water Plant at the University
Park campus. Scope includes new
building construction along with the
initial chilled water, condenser water
and electrical equipment and plant
infrastructure. Funding will be used
20210SB0915PN1157 - 22 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
for both design and construction
costs, as well as necessary utility
upgrades and extensions, site
improvements and code-related
upgrades. All costs for both occupant
and program relocation or interim
facilities will be included. The
construction will both meet all
current building code requirements and
provide for barrier-free access as
required by the Americans with
Disabilities Act and related codes
Project Allocation 40,000,000
(L) Advanced Water Treatment System
(University Park Campus) design,
construction (new space or addition to
and/or renovation of existing space;
including demolition, abatement of
hazardous materials, extensions and/or
upgrading of utilities and other
infrastructure needs) and other
related costs for an Advanced Water
Treatment System at the University
Park campus. Funding will be used for
both design and construction costs, as
well as necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
20210SB0915PN1157 - 23 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes
Project Allocation 15,000,000
(M) Classroom-Library Building Renovation
(and Nursing Addition) (Scranton
Campus) design, construction (new
space or addition to and/or renovation
of existing space; including
demolition, abatement of hazardous
materials, extensions and/or upgrading
of utilities and other infrastructure
needs) and other related costs for the
Classroom-Library Building Renovation
(and Nursing Addition) at the Scranton
campus. A total renovation is needed
to address a multitude of
deficiencies. An addition for the
expansion of the Nursing program is
planned. Funding will be used for both
design and construction costs, as well
as necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
20210SB0915PN1157 - 24 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes
Project Allocation 20,000,000
(N) Kelly Library Renovation and Addition
(Greater Allegheny Campus) design,
construction (new space or addition to
and/or renovation of existing space;
including demolition, abatement of
hazardous materials, extensions and/or
upgrading of utilities and other
infrastructure needs) and other
related costs for the Kelly Library
Renovation and Addition at the Greater
Allegheny campus. A total renovation
is needed to address a multitude of
deficiencies. An addition for an
auditorium is planned. Funding will be
used for both design and construction
costs, as well as necessary utility
upgrades and extensions, site
improvements and code-related
upgrades. All costs for both occupant
and program relocation or interim
facilities will be included. The
construction will both meet all
current building code requirements and
provide for barrier-free access as
20210SB0915PN1157 - 25 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
required by the Americans with
Disabilities Act and related codes
Project Allocation 20,000,000
(O) Classroom/Class Lab Teaching and
Learning Building (Harrisburg Campus)
Design, construction (new space or
addition to and/or renovation of
existing space; including demolition,
abatement of hazardous materials,
extensions and/or upgrading of
utilities and other infrastructure
needs) and other related costs for a
Classroom/Class Lab Teaching and
Learning Building at the Harrisburg
campus. A new multistory
Classroom/Class Lab Building will be
constructed to provide modern
classrooms, instructional
laboratories, faculty offices,
instructional support and
flexible/adaptable space to support
both general and technology
instructional programs, as well as
campus engagement activities. Funding
will be used for both design and
construction costs, as well as
necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
20210SB0915PN1157 - 26 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
or interim facilities will be
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes
Project Allocation 50,000,000
(P) Teaching and Administrative Support
Building (Hershey Campus) design,
construction (new space or addition to
and/or renovation of existing space;
including demolition, abatement of
hazardous materials, extensions and/or
upgrading of utilities and other
infrastructure needs) and other
related costs for a Teaching and
Administrative Support Building at the
Hershey campus. This project will
provide space for key administrative
units on campus. The program will
include new administrative and support
spaces, offices and meeting rooms. The
facility will be equipped with state-
of-the-art technology. The facility
will be located on the core campus
adjacent to clinical, administrative,
research and academic facilities
easily accessible by students, faculty
and visitors. Funding will be used for
20210SB0915PN1157 - 27 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
both design and construction costs, as
well as necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes
Project Allocation 80,000,000
(Q) Capital Renewal (Hershey Campus)
design, construction (new space or
addition to and/or renovation of
existing space; including demolition,
abatement of hazardous materials,
extensions and/or upgrading of
utilities and other infrastructure
needs) and other related costs for
Capital Renewal at the Hershey campus.
This project is part of a continuing
effort to make significant
comprehensive upgrades to
infrastructure in the College of
Medicine buildings at the Hershey
Campus. This project will allow the
University to replace, install or
upgrade as appropriate systems in
20210SB0915PN1157 - 28 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
major academic, research and
administrative buildings across campus
that were not addressed in routine
renewal programs. Funding will be used
for both design and construction
costs, as well as necessary utility
upgrades and extensions, site
improvements and code-related
upgrades. All costs for both occupant
and program relocation or interim
facilities will be included. The
construction will both meet all
current building code requirements and
provide for barrier-free access as
required by the Americans with
Disabilities Act and related codes
Project Allocation 30,000,000
(R) Academic and Research Building
(Hershey Campus) design, construction
(new space or addition to and/or
renovation of existing space;
including demolition, abatement of
hazardous materials, extensions and/or
upgrading of utilities and other
infrastructure needs) and other
related costs for an Academic and
Research Building at the Hershey
campus. This project will include new
wet and dry research laboratories,
comparative medicine spaces, support
20210SB0915PN1157 - 29 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
spaces, instructional spaces, seminar
rooms, offices and administration
space. The facility will be equipped
with state-of-the-art instructional
technology. The facility will be
located on the core campus adjacent to
academic, clinical and other research
facilities easily accessible by
students, faculty and visitors.
Funding will be used for both design
and construction costs, as well as
necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes
Project Allocation 160,000,000
(iv) Temple University
(A) Design, infrastructure, abatement of
hazardous materials and construction
of an academic/administrative
building, including utility upgrades
and extensions, site improvements and
code-related upgrades, including ADA
20210SB0915PN1157 - 30 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
compliance-related upgrades, at the
main campus of Temple University
Project Allocation 250,000,000
(B) Design, infrastructure, abatement of
hazardous materials and construction
of an academic/administrative
building, including utility upgrades
and extensions, site improvements and
code-related upgrades, including ADA
compliance-related upgrades, at the
main campus of Temple University.
Project Allocation 185,000,000
(C) New classroom building, addition,
renovation - design, infrastructure,
abatement of hazardous materials and
construction of a classroom building
academic complex. This will involve
renovating and addition to an existing
building or build a stand alone
classroom building
Project Allocation 125,000,000
(C) New Science, Technology, Engineering
and Mathematics (STEM) academic
building, addition, renovation -
design, infrastructure, abatement of
hazardous materials and construction
of a STEM academic complex. This will
involve renovating and addition to an
existing building or build a stand-
alone building
20210SB0915PN1157 - 31 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 125,000,000
(D) Design, infrastructure, abatement of
hazardous materials, renovation and
construction of expansion to Ritter
Hall, including utility upgrades and
extensions, site improvements, code-
related upgrades, including ADA
compliance-related upgrades
Project Allocation 40,000,000
(v) Thaddeus Stevens College of Technology
(A) Hartzell renovations
Project Allocation 4,000,000
(B) Jones renovations
Project Allocation 5,000,000
(C) Mellor renovations
Project Allocation 20,000,000
(D) Dorm renovations
Project Allocation 5,000,000
(E) Shop addition
Project Allocation 5,000,000
(F) Student Center addition
Project Allocation 5,000,000
(G) Campus improvements to meet current
and future demands, including, but not
limited to, land acquisition, site and
building infrastructure improvements,
new construction, renovations and
building system upgrades and
improvements
Project Allocation 18,000,000
20210SB0915PN1157 - 32 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(H) Branch Campus improvements to meet
current and future demands, including,
but not limited to, land acquisition,
site and building infrastructure
improvements, new construction,
renovations and building system
upgrades and improvements
Project Allocation 8,000,000
(vi) University of Pittsburgh
(A) New Integrated Health Sciences
Building, Oakland Campus
Project Allocation 200,000,000
(B) New Academic Student Support Center
Building, Oakland Campus
Project Allocation 80,000,000
(C) New One Bigelow Academic Teaching and
Research Complex, Oakland Campus
Project Allocation 300,000,000
(D) Posvar Hall addition and renovation,
Oakland Campus
Project Allocation 100,000,000
(E) Posvar Hall Chiller Plant expansion
and upgrade, Oakland Campus
Project Allocation 50,000,000
(F) Programmatic and infrastructure
upgrades to buildings, Oakland Campus
Project Allocation 50,000,000
(G) Crabtree Hall renovations, Oakland
Campus
Project Allocation 110,000,000
20210SB0915PN1157 - 33 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(5) Pennsylvania Emergency Management Agency
(Reserved)
(6) Department of Environmental Protection
(i) Carbon County
(A) Quakake Treatment Facility additional
funds for construction of acid mine
treatment facility
Project Allocation 6,000,000
(ii) Clarion County
(A) Mill Creek Treatment Facility
construction of treatment facility
Project Allocation 14,000,000
(iii) Clearfield County
(A) Addition funds for additional culvert
alignment under borough streets at
Stinky Run
Project Allocation 1,000,000
(iv) Fayette County
(A) Phillips Discharge Treatment Facility
construction of treatment facility
Project Allocation 12,000,000
(v) Jefferson County
(A) Weisner Hollow additional funds to
decertify high hazard dam and
construct permanent drainage
channel. Regrade and revegetate site
Project Allocation 6,500,000
(vi) Lycoming County
(A) Grafius Run and Freedom Road
Tributary - improve existing culverts
20210SB0915PN1157 - 34 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
in the City of Williamsport
Project Allocation 3,500,000
(vii) Westmoreland County
(A) West Newton Coal Logistics Slope
embankment stabilization and coal
refuse slurry impoundment capping
Project Allocation 23,000,000
(7) Department of General Services
(i) Berks County
(A) Renovations, alterations, new
construction, site improvements,
infrastructure upgrades and land
acquisition for DGS-owned buildings in
the Reading area
Project Allocation 15,000,000
(ii) Dauphin County
(A) Renovations, alterations, new
construction, site improvements,
infrastructure upgrades and land
acquisition for DGS-owned buildings in
the Harrisburg area
Project Allocation 200,000,000
(B) Upgrade and expansion of IT
infrastructure and automation system
redundancy
Project Allocation 100,000,000
(C) Renovations and alterations for
upgrades and infrastructure
improvements to the Finance Building
Project Allocation 100,000,000
20210SB0915PN1157 - 35 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(iii) Lackawanna County
(A) Renovations, alterations, new
construction, site improvements,
infrastructure upgrades and land
acquisition for DGS-owned buildings in
Scranton
Project Allocation 15,000,000
(iv) Statewide
(A) Professional services for the
development of agency facility
strategic master plans and capital
planning
Project Allocation 15,000,000
(8) Department of Human Services
(i) Clarks Summit State Hospital
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades, and land
acquisition
Project Allocation 9,000,000
(ii) Danville State Hospital
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades, and land
acquisition
Project Allocation 9,000,000
(iii) Ebensburg Center
(A) Renovate the institution, including
20210SB0915PN1157 - 36 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
new construction, alterations,
renovations, site improvements and
infrastructure upgrades, and land
acquisition
Project Allocation 9,000,000
(iv) Loysville Youth Development Center
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements, and
infrastructure upgrades, and land
acquisition
Project Allocation 9,000,000
(v) Norristown State Hospital
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades, and land
acquisition
Project Allocation 9,000,000
(vi) North Central Secure Treatment Unit
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades, and land
acquisition
Project Allocation 7,000,000
(vii) Selinsgrove Center
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
20210SB0915PN1157 - 37 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
infrastructure upgrades, and land
acquisition
Project Allocation 9,000,000
(viii) South Mountain Secure Treatment Unit
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades, and land
acquisition
Project Allocation 5,000,000
(ix) South Mountain Restoration Center
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades, and land
acquisition
Project Allocation 9,000,000
(x) Torrance State Hospital
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades, and land
acquisition
Project Allocation 9,000,000
(xi) Warren State Hospital
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades, and land
acquisition
20210SB0915PN1157 - 38 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 9,000,000
(xii) Wernersville State Hospital
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades, and land
acquisition
Project Allocation 9,000,000
(xiii) Youth Forestry Camp No.2
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades, and land
acquisition
Project Allocation 9,000,000
(xiv) Youth Forestry Camp No.3
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades, and land
acquisition
Project Allocation 5,000,000
(9) Pennsylvania Historical and Museum
Commission
(i) State Museum
(A) Exhibit upgrades
Project Allocation 20,000,000
(ii) Brandywine Battlefield Park
(A) Building, site and infrastructure
improvements
20210SB0915PN1157 - 39 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 5,000,000
(iii) Daniel Boone Homestead
(A) Building, site and infrastructure
improvements
Project Allocation 5,000,000
(iv) Drake Well
(A) Building, site and infrastructure
improvements
Project Allocation 3,000,000
(v) Erie Maritime Museum
(A) Building, site and infrastructure
improvements
Project Allocation 2,000,000
(vi) Graeme Park
(A) Building, site and infrastructure
improvements
Project Allocation 3,500,000
(B) Exhibit upgrades
Project Allocation 1,000,000
(vii) Railroad Museum of Pennsylvania
(A) Building, infrastructure and site
improvements
Project Allocation 3,000,000
(10) Department of Military and Veterans Affairs
(i) Delaware Valley Veterans Home
(A) Construct new adult day health care
and 48-bed nursing care addition with
additional parking area
Project Allocation 20,000,000
(B) Rehabilitate Veterans' Home
20210SB0915PN1157 - 40 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 10,000,000
(ii) Gino J. Merli Veterans Center
(A) Construct new adult day health care
addition with parking area, including
demolition as required
Project Allocation 13,500,000
(B) Rehabilitate Veterans' Home
Project Allocation 10,000,000
(iii) Hollidaysburg Veterans Home
(A) Construct new adult day health care
addition with additional parking area
Project Allocation 8,040,000
(B) Rehabilitate Veterans' Home
Project Allocation 10,000,000
(iv) Pennsylvania Soldiers' & Sailors' Home,
Erie
(A) Construct new adult day health care
addition with additional parking area
Project Allocation 10,720,000
(B) Rehabilitate Veterans' Home
Project Allocation 10,000,000
(v) Southeastern Veterans' Center, Spring
City
(A) Rehabilitate Veterans' Home
Project Allocation 10,000,000
(vi) Southwestern Veterans' Center,
Pittsburgh
(A) Construct new adult day health care
addition with additional parking area
Project Allocation 14,740,000
20210SB0915PN1157 - 41 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(B) Rehabilitate Veterans' Home
Project Allocation 10,000,000
(vii) Statewide Veterans' Homes
(A) Provide safety measures and physical
security upgrades, including new
construction, renovations, electronic
security systems and equipment, and
site work
Project Allocation 30,000,000
(B) Provide additional funding to
rehabilitate PA Veterans' Homes,
including to remedy life safety and
regulatory deficiencies
Project Allocation 30,000,000
(viii) Allentown Readiness Center
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 10,000,000
(ix) Beaver Falls
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 10,000,000
(x) Berks County Readiness Centers
(A) Renovate DMVA facilities in Berks
20210SB0915PN1157 - 42 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
County, including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 20,000,000
(xi) Cambridge Springs Readiness Center
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 12,500,000
(xii) Carlisle Readiness Center
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 12,500,000
(xiii) Chambersburg Readiness Center
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 10,000,000
(xiv) Coatesville Readiness Center
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
20210SB0915PN1157 - 43 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
infrastructure deficiencies and
security system upgrades
Project Allocation 10,000,000
(xv) Easton Readiness Center
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 10,000,000
(xvi) Everett Readiness Center
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 10,000,000
(xvii) Fort Indiantown Gap DMVA facilities
and infrastructure
(A) Renovate the Readiness Center,
including new construction, correcting
structure and infrastructure
deficiencies and security system
upgrades
Project Allocation 37,500,000
(xviii) Greensburg Readiness Center
(A) Renovate the Readiness Center,
including new construction, correcting
structure and infrastructure
deficiencies and security system
20210SB0915PN1157 - 44 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
upgrades
Project Allocation 10,000,000
(xix) Huntingdon Readiness Center
(A) Renovate the Readiness Center,
including new construction, correcting
structure and infrastructure
deficiencies and security system
upgrades
Project Allocation 10,000,000
(xx) Lebanon Readiness Center
(A) Renovate the Readiness Center,
including new construction, correcting
structure and infrastructure
deficiencies and security system
upgrades
Project Allocation 12,500,000
(xxi) Lewisburg Readiness Center
(A) Renovate the Readiness Center,
including new construction, correcting
structure and infrastructure
deficiencies and security system
upgrades
Project Allocation 12,500,000
(xxii) Lewistown Readiness Center
(A) Renovate the Readiness Center,
including new construction, correcting
structure and infrastructure
deficiencies and security system
upgrades
Project Allocation 12,500,000
20210SB0915PN1157 - 45 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(xxiii) Luzerne County Readiness Centers
(A) Renovate DMVA facilities in Luzerne
County, including demolition, new
construction, correcting structure and
infrastructure deficiencies, and
security system upgrades
Project Allocation 25,000,000
(xxiv) Philadelphia/Delaware Counties
(A) Renovate the facility, including
demolition, new construction,
correcting structure and
infrastructure deficiencies, and
security system upgrades for Readiness
Center
Project Allocation 20,000,000
(xxv) Punxsutawney Readiness Center
(A) Renovate the Readiness Center,
including new construction, correcting
structure and infrastructure
deficiencies and security system
upgrades
Project Allocation 7,500,000
(xxvi) South Mountain Readiness Center
(A) Renovate the Readiness Center,
including new construction, correcting
structure and infrastructure
deficiencies and security system
upgrades
Project Allocation 7,500,000
(xxvii) Tamaqua Readiness Center
20210SB0915PN1157 - 46 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Renovate the Readiness Center,
including new construction, correcting
structure and infrastructure
deficiencies and security system
upgrades
Project Allocation 15,000,000
(xxviii) Wellsboro Readiness Center
(A) Renovate the Readiness Center,
including new construction, correcting
structure and infrastructure
deficiencies and security system
upgrades
Project Allocation 10,000,000
(xxix) New Readiness Center
(A) Land and/or building acquisition for
new readiness center to relocate
existing center in Dauphin and/or
Lebanon counties
Project Allocation 20,000,000
(B) Acquisition of land and or facilities
to build or renovate buildings for a
new readiness center in Southeastern
Pennsylvania
Project Allocation 33,000,000
(xxx) Horsham Air Guard Station
(A) Acquisition of land to construct new
gate
Project Allocation 8,000,000
(11) Office of Administration
(i) Commonwealth Technology Center (Reserved)
20210SB0915PN1157 - 47 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(12) Pennsylvania State Police
(i) Statewide
(A) Capital renewal of existing
facilities, including site and
building envelop improvements,
interior renovations, building system
upgrades and code-required
improvements
Project Allocation 25,000,000
(B) Land acquisition or purchase of
existing facility to replace existing
troop headquarter buildings or provide
new facilities
Project Allocation 29,000,000
(13) State System of Higher Education
(i) Bloomsburg University
(A) Acquisition or construction of
student housing
Project Allocation 98,000,000
(B) Provide for deferred maintenance
needs and capital renewal repairs,
additional funds
Project Allocation 25,000,000
(ii) California University
(A) Acquisition or construction of
student housing, additional funds
Project Allocation 33,000,000
(B) Provide for deferred maintenance
needs and capital renewal repairs,
additional funds
20210SB0915PN1157 - 48 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 20,000,000
(iii) Cheyney University
(A) Provide for deferred maintenance
needs and capital renewal repairs,
additional funds
Project Allocation 20,000,000
(iv) Clarion University
(A) Provide for deferred maintenance
needs and capital renewal repairs,
additional funds
Project Allocation 20,000,000
(v) East Stroudsburg University
(A) Provide for deferred maintenance
needs and capital renewal repairs,
additional funds
Project Allocation 20,000,000
(vi) Edinboro University
(A) Hamilton Hall renovation
Project Allocation 25,000,000
(B) Demolition of underutilized and
obsolete buildings
Project Allocation 15,000,000
(C) Provide for deferred maintenance
needs and capital renewal repairs,
additional funds
Project Allocation 20,000,000
(D) Renovation and rehabilitation of
athletic facilities
Project Allocation 2,000,000
(vii) Indiana University
20210SB0915PN1157 - 49 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Upgrade of campus utilities
infrastructure
Project Allocation 40,000,000
(B) Demolition of underutilized and
obsolete buildings, additional funds
Project Allocation 15,000,000
(C) Provide for deferred maintenance
needs and capital renewal repairs,
additional funds
Project Allocation 35,000,000
(viii) Kutztown University
(A) Provide for deferred maintenance
needs and capital renewal repairs,
additional funds
Project Allocation 20,000,000
(B) Beeky Education Building renovation
Project Allocation 19,000,000
(ix) Lock Haven University
(A) Acquisition or construction of
student housing, additional funds
Project Allocation 20,000,000
(B) Provide for deferred maintenance
needs and capital renewal repairs,
additional funds
Project Allocation 20,000,000
(x) Mansfield University
(A) Provide for deferred maintenance
needs and capital renewal repairs,
additional funds
Project Allocation 20,000,000
20210SB0915PN1157 - 50 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(B) Renovation, replacement or upgrade of
campus utilities infrastructure,
additional funds
Project Allocation 5,000,000
(xi) Millersville University
(A) Renovation, replacement or upgrade of
campus utilities infrastructure,
additional funds
Project Allocation 21,000,000
(B) Stadium renovation
Project Allocation 15,000,000
(xii) Shippensburg University
(A) Heiges Field House renovation and
addition
Project Allocation 40,000,000
(B) Old Main renovation
Project Allocation 15,000,000
(C) Provide for deferred maintenance
needs and capital renewal repairs,
additional funds
Project Allocation 20,000,000
(xiii) Slippery Rock University
(A) Additional funds for McKay Building
renovation/addition
Project Allocation 15,000,000
(B) Provide for deferred maintenance
needs and capital renewal repairs,
additional funds
Project Allocation 29,000,000
(xiv) West Chester University
20210SB0915PN1157 - 51 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Provide for deferred maintenance
needs and capital renewal repairs,
additional funds
Project Allocation 32,000,000
(14) Department of Transportation
(i) Adams County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(ii) Allegheny County
(A) Renovation and expansion for code
compliance, upgraded building systems
improved program requirements and
energy efficiency at District Office
11-0
Project Allocation 10,000,000
(B) Renovation and expansion for code
compliance, upgraded building systems
improved program requirements and
energy efficiency at the Western
Training Facility
Project Allocation 5,000,000
20210SB0915PN1157 - 52 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(C) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(D) Provide for the construction or
renovation of maintenance facility at
Fort Pitt Tunnel, including site
acquisition and development, design
and construction of buildings, systems
and utility work
Project Allocation 7,000,000
(E) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 11
Project Allocation 5,000,000
(F) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 12
Project Allocation 5,000,000
(G) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
20210SB0915PN1157 - 53 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
meet code and program requirements
Project Allocation 5,000,000
(iii) Armstrong County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(iv) Beaver County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(v) Bedford County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
20210SB0915PN1157 - 54 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(vi) Berks County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(vii) Blair County
(A) Renovation and expansion for code
compliance, upgraded building systems,
improved program requirements and
energy efficiency at District Office
9-0
Project Allocation 10,000,000
(B) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
20210SB0915PN1157 - 55 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(C) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(viii) Bradford County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(ix) Bucks County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
20210SB0915PN1157 - 56 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Welcome
Center - Site P
Project Allocation 5,000,000
(C) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(x) Butler County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xi) Cambria County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
20210SB0915PN1157 - 57 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xii) Cameron County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xiii) Carbon County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xiv) Centre County
(A) Provide for the construction or
renovation of Bellefonte Maintenance
20210SB0915PN1157 - 58 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
facility, including site acquisition
and development, design and
construction of buildings, systems and
utility work
Project Allocation 7,000,000
(B) Provide for the construction or
renovation of Phillipsburg Maintenance
facility, including site acquisition
and development, design and
construction of buildings, systems and
utility work
Project Allocation 7,000,000
(C) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 29
Project Allocation 5,000,000
(D) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 30
Project Allocation 5,000,000
(E) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
20210SB0915PN1157 - 59 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 5,000,000
(xv) Chester County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xvi) Clarion County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xvii) Clearfield County
(A) Renovation and expansion for code
compliance, upgraded building systems,
improved program requirements and
energy efficiency at District Office
20210SB0915PN1157 - 60 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
2-0
Project Allocation 10,000,000
(B) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(C) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xviii) Clinton County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 33
Project Allocation 5,000,000
(C) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
20210SB0915PN1157 - 61 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 34
Project Allocation 5,000,000
(D) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xix) Columbia County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 37
Project Allocation 5,000,000
(C) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 38
Project Allocation 5,000,000
20210SB0915PN1157 - 62 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(D) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xx) Crawford County
(A) Provide for the construction or
renovation of Centerville maintenance
facility, including site acquisition
and development, design and
construction of buildings, systems and
utility work
Project Allocation 7,000,000
(B) Provide for the construction or
renovation of Meadville maintenance
facility, including site acquisition
and development, design and
construction of buildings, systems and
utility work
Project Allocation 7,000,000
(C) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 19
Project Allocation 5,000,000
(D) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
20210SB0915PN1157 - 63 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 20
Project Allocation 5,000,000
(E) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxi) Cumberland County
(A) Provide for the construction or
renovation of Carlisle maintenance
facility, including site acquisition
and development, design and
construction of buildings, systems and
utility work
Project Allocation 7,000,000
(B) Provide for the construction or
renovation of Lemoyne maintenance
facility, including site acquisition
and development, design and
construction of buildings, systems and
utility work
Project Allocation 7,000,000
(C) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 45
20210SB0915PN1157 - 64 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 5,000,000
(D) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 46
Project Allocation 5,000,000
(E) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxii) Dauphin County
(A) Renovation and expansion for code
compliance, upgraded building systems,
improved program requirements and
energy efficiency at District Office
8-0
Project Allocation 10,000,000
(B) Renovation and expansion for code
compliance, upgraded building systems,
improved program requirements and
energy efficiency at the Material
Testing Lab
Project Allocation 8,000,000
(C) Renovation and expansion for code
compliance, upgraded building systems,
improved program requirements and
energy efficiency at the Fleet
20210SB0915PN1157 - 65 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Management Facility
Project Allocation 5,000,000
(D) Construction or renovation of Sign
Shop facility. May include site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 5,000,000
(E) Provide for the construction or
renovation of Harrisburg maintenance
facility, including site acquisition
and development, design and
construction of buildings, systems and
utility work
Project Allocation 7,000,000
(F) Provide for the construction or
renovation of Elizabethville
maintenance facility, including site
acquisition and development, design
and construction of buildings, systems
and utility work
Project Allocation 7,000,000
(G) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 47
Project Allocation 5,000,000
(H) Renovation, expansion or replacement,
20210SB0915PN1157 - 66 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 48
Project Allocation 5,000,000
(I) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxiii) Delaware County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Welcome
Center - Site N
Project Allocation 5,000,000
(C) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
20210SB0915PN1157 - 67 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(xxiv) Elk County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxv) Erie County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Welcome
Center - Site L
Project Allocation 5,000,000
(C) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
20210SB0915PN1157 - 68 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
and sewage plant upgrades, at Welcome
Center - Site M
Project Allocation 5,000,000
(D) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxvi) Fayette County
(A) Renovation and expansion for code
compliance, upgraded building systems,
improved program requirements and
energy efficiency at District Office
12-0
Project Allocation 10,000,000
(B) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(C) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxvii) Forrest County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
20210SB0915PN1157 - 69 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxviii) Franklin County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Welcome
Center - Site G
Project Allocation 5,000,000
(C) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxix) Fulton County
(A) Provide for the construction or
renovation of maintenance facility,
20210SB0915PN1157 - 70 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Welcome
Center - Site B
Project Allocation 5,000,000
(C) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 3
Project Allocation 5,000,000
(D) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxx) Greene County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
20210SB0915PN1157 - 71 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(B) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Welcome
Center - Site D
Project Allocation 5,000,000
(C) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxxi) Huntingdon County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxxii) Indiana County
(A) Renovation and expansion for code
compliance, upgraded building systems,
improved program requirements and
energy efficiency at District Office
10-0
20210SB0915PN1157 - 72 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 10,000,000
(B) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(C) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxxiii) Jefferson County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 25
Project Allocation 5,000,000
(C) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
20210SB0915PN1157 - 73 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
and sewage plant upgrades, at Roadside
Rest Area - Site 26
Project Allocation 5,000,000
(D) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxxiv) Juniata County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxxv) Lackawanna County
(A) Renovation and expansion for code
compliance, upgraded building systems,
improved program requirements and
energy efficiency at District Office
4-0
Project Allocation 10,000,000
(B) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
20210SB0915PN1157 - 74 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(C) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 55
Project Allocation 5,000,000
(D) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxxvi) Lancaster County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxxvii) Lawrence County
(A) Provide for the construction or
renovation of maintenance facility,
20210SB0915PN1157 - 75 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 15
Project Allocation 5,000,000
(C) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 16
Project Allocation 5,000,000
(D) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxxviii) Lebanon County
(A) Renovation and expansion for code
compliance, upgraded building systems,
improved program requirements and
energy efficiency at the Eastern
Training Facility
Project Allocation 5,000,000
20210SB0915PN1157 - 76 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(B) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(C) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxxix) Lehigh County
(A) Renovation and expansion for code
compliance, upgraded building systems,
improved program requirements and
energy efficiency at District Office
5-0
Project Allocation 10,000,000
(B) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(C) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xl) Luzerne County
20210SB0915PN1157 - 77 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 39
Project Allocation 5,000,000
(C) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 53
Project Allocation 5,000,000
(D) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 54
Project Allocation 5,000,000
(E) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
20210SB0915PN1157 - 78 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
meet code and program requirements
Project Allocation 5,000,000
(xli) Lycoming County
(A) Renovation and expansion for code
compliance, upgraded building systems,
improved program requirements and
energy efficiency at District Office
3-0
Project Allocation 10,000,000
(B) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(C) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xlii) McKean County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
20210SB0915PN1157 - 79 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
meet code and program requirements
Project Allocation 5,000,000
(xliii) Mercer County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Welcome
Center - Site E
Project Allocation 5,000,000
(C) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 17
Project Allocation 5,000,000
(D) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 18
Project Allocation 5,000,000
20210SB0915PN1157 - 80 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(E) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xliv) Mifflin County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xlv) Monroe County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking
lot, and sewage plant upgrades, at
Welcome Center - Site F
20210SB0915PN1157 - 81 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 5,000,000
(C) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 41
Project Allocation 5,000,000
(D) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xlvi) Montgomery County
(A) Renovation and expansion for code
compliance, upgraded building systems,
improved program requirements and
energy efficiency at District Office
6-0
Project Allocation 10,000,000
(B) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(C) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
20210SB0915PN1157 - 82 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 5,000,000
(xlvii) Montour County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 35
Project Allocation 5,000,000
(C) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 36
Project Allocation 5,000,000
(D) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xlviii) Northampton County
(A) Provide for the construction or
renovation of maintenance facility,
20210SB0915PN1157 - 83 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xlix) Northumberland County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(l) Perry County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
20210SB0915PN1157 - 84 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(li) Philadelphia County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(lii) Pike County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Welcome
Center - Site K
Project Allocation 5,000,000
(C) Renovation, expansion or replacement,
20210SB0915PN1157 - 85 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking
lot, and sewage plant upgrades, at
Roadside Rest Area - Site 61
Project Allocation 5,000,000
(D) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 62
Project Allocation 5,000,000
(E) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(liii) Potter County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
20210SB0915PN1157 - 86 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(liv) Schuylkill County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(lv) Snyder County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new Stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(lvi) Somerset County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
20210SB0915PN1157 - 87 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(lvii) Sullivan County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(lviii) Susquehanna County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Welcome
20210SB0915PN1157 - 88 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Center - Site H
Project Allocation 5,000,000
(C) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 56
Project Allocation 5,000,000
(D) Construction of a new stockpile
facility with land acquisition, or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(lix) Tioga County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Welcome
Center - Site T
Project Allocation 5,000,000
(C) Construction of a new stockpile
facility with land acquisition or
20210SB0915PN1157 - 89 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(lx) Union County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(lxi) Venango County
(A) Renovation and expansion for code
compliance, upgraded building systems,
improved program requirements and
energy efficiency at District Office
1-0
Project Allocation 10,000,000
(B) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(C) Renovation, expansion or replacement,
including land acquisition, roof
20210SB0915PN1157 - 90 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 21
Project Allocation 5,000,000
(D) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking
lot, and sewage plant upgrades, at
Roadside Rest Area - Site 22
Project Allocation 5,000,000
(E) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(lxii) Warren County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(lxiii) Washington County
20210SB0915PN1157 - 91 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Provide for the construction or
renovation of West Brownsville
maintenance facility, including site
acquisition and development, design
and construction of buildings, systems
and utility work
Project Allocation 7,000,000
(C) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Welcome
Center - Site A
Project Allocation 5,000,000
(D) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(lxiv) Wayne County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
20210SB0915PN1157 - 92 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(lxv) Westmoreland County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(lxvi) Wyoming County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
20210SB0915PN1157 - 93 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 5,000,000
(lxvii) York County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking
lot, and sewage plant upgrades, at
Welcome Center - Site J
Project Allocation 5,000,000
(C) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
Section 4. Itemization of furniture and equipment projects.
Additional capital projects in the category of public
improvement projects consisting of the acquisition of movable
furniture and equipment to complete public improvement projects
and to be purchased by the Department of General Services, its
successors or assigns, and to be financed by the incurring of
debt are hereby itemized, together with their estimated
financial cost, as follows:
Project
Total Project
Allocation
20210SB0915PN1157 - 94 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(1) Department of Education
(i) Lincoln University
(A) Provide original furniture and
equipment for Houston Hall
Project Allocation 2,500,000
(ii) The Pennsylvania State University
(A) Davey Laboratory renovation
(University Park campus) original
furniture, fixtures and equipment for
Davey Laboratory at the University
Park campus
Project Allocation 15,000,000
(B) Osmond Laboratory renovation - Phase
II (University Park campus) original
furniture, fixtures and equipment for
Phase II of Osmond Laboratory at the
University Park campus
Project Allocation 6,000,000
(C) Carpenter Building renovation
(University Park campus) original
furniture, fixtures and equipment for
the Carpenter Building at the
University Park campus
Project Allocation 6,000,000
(D) Student Support and Services Center
(University Park campus) original
furniture, fixtures and equipment for
the Student Support and Services
Center at the University Park campus
Project Allocation 12,000,000
20210SB0915PN1157 - 95 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(E) Electrical Engineering West
renovation (University Park campus)
original furniture, fixtures and
equipment for Electrical Engineering
West at the University Park campus
Project Allocation 8,000,000
(F) Electrical Engineering East
renovation (University Park campus)
original furniture, fixtures and
equipment for Electrical Engineering
East at the University Park campus
Project Allocation 6,000,000
(G) Pattee Library/Paterno Library
renovation (University Park campus)
Pattee Library/Paterno Library
renovation at University Park campus
Project Allocation 6,000,000
(H) Sparks Building renovation
(University Park campus) original
furniture, fixtures and equipment for
the Sparks Building at the University
Park campus
Project Allocation 13,000,000
(I) Applied Research Laboratory
renovation (University Park campus)
original furniture, fixtures and
equipment for the Applied Research
Laboratory at the University Park
campus
Project Allocation 7,000,000
20210SB0915PN1157 - 96 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(J) Chilled water plant (University Park
campus) original furniture, fixtures
and equipment for a chilled water
plant at the University Park campus
Project Allocation 4,000,000
(K) Advanced water treatment system
(University Park campus) original
furniture, fixtures and equipment for
an advanced water treatment system at
the University Park campus
Project Allocation 3,000,000
(L) Classroom-library building renovation
(and nursing addition) (Scranton
campus) original furniture, fixtures
and equipment for the classroom-
library building renovation (and
nursing addition) at the Scranton
campus
Project Allocation 3,000,000
(M) Kelly Library renovation (and
addition) (Greater Allegheny campus)
original furniture, fixtures and
equipment for Kelly Library renovation
(and addition) at the Greater
Allegheny campus
Project Allocation 3,000,000
(N) Classroom/class lab teaching and
learning building (Harrisburg campus)
original furniture, fixtures and
equipment for a classroom/class lab
20210SB0915PN1157 - 97 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
teaching and learning building at the
Harrisburg campus
Project Allocation 5,000,000
(O) Teaching and administrative support
building (Hershey campus) original
furniture, fixtures and equipment for
a teaching and administrative support
building at the Hershey campus
Project Allocation 12,000,000
(P) Academic and research building
(Hershey campus) original furniture,
fixtures and equipment for an academic
and research building at the Hershey
campus
Project Allocation 10,000,000
(iii) Thaddeus Stevens College of Technology
(A) Original furniture, fixtures and
equipment for dormitory buildings
Project Allocation 125,000
(B) Original furniture, fixtures and
equipment for Transportation Center
Project Allocation 3,500,000
(2) Department of General Services
(i) Department of General Services
(A) Provide original furniture and
equipment for the Finance Building
Project Allocation 25,000,000
(B) Provide original furniture and
equipment for the Scranton State
Office Building
20210SB0915PN1157 - 98 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 3,500,000
(C) Provide original furniture and
equipment for the Reading Office
Building
Project Allocation 3,500,000
(3) Pennsylvania Historical and Museum
Commission
(i) Pennsylvania State Archive Building
(A) Provide original furniture and
equipment for facility
Project Allocation 3,000,000
(4) Department of Military and Veterans Affairs
(i) Delaware Valley Veterans Home
(A) Provide original furniture and
equipment for new nursing care
addition and new adult day health care
program
Project Allocation 3,814,190
(ii) Gino J. Merli Veterans Center
(A) Provide original furniture and
equipment for new adult day health
care program
Project Allocation 500,000
(iii) Hollidaysburg Veterans Home
(A) Provide original furniture and
equipment for new adult day health
care program
Project Allocation 500,000
(iv) Pennsylvania Soldiers' & Sailors' Home,
Erie
20210SB0915PN1157 - 99 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Provide original furniture and
equipment for new adult day health
care program
Project Allocation 500,000
(v) Southwestern Veterans' Center, Pittsburgh
(A) Provide original furniture and
equipment for new adult day health
care program
Project Allocation 500,000
(vi) Allentown Readiness Center
(A) Provide original furniture and
equipment for Allentown Readiness
Center
Project Allocation 1,000,000
(vii) Beaver Falls
(A) Provide original furniture and
equipment for Beaver Falls Readiness
Center
Project Allocation 1,000,000
(viii) Berks County Readiness Centers
(A) Provide original furniture and
equipment for Berks County Readiness
Centers
Project Allocation 2,000,000
(ix) Cambridge Springs Readiness Center
(A) Provide original furniture and
equipment for Cambridge Springs
Readiness Center
Project Allocation 1,000,000
(x) Carlisle Readiness Center
20210SB0915PN1157 - 100 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Provide original furniture and
equipment for Carlisle Readiness
Center
Project Allocation 1,000,000
(xi) Chambersburg Readiness Center
(A) Provide original furniture and
equipment for Chambersburg Readiness
Center
Project Allocation 1,000,000
(xii) Coatesville Readiness Center
(A) Provide original furniture and
equipment for Coatesville Readiness
Center
Project Allocation 1,000,000
(xiii) Easton Readiness Center
(A) Provide original furniture and
equipment for Easton Readiness Center
Project Allocation 1,000,000
(xiv) Everett Readiness Center
(A) Provide original furniture and
equipment for Everett Readiness Center
Project Allocation 1,000,000
(xv) Fort Indiantown Gap DMVA facilities
(A) Provide original furniture and
equipment for Fort Indiantown Gap DMVA
facilities
Project Allocation 10,000,000
(xvi) Greensburg Readiness Center
(A) Provide original furniture and
equipment for Greensburg Readiness
20210SB0915PN1157 - 101 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Center
Project Allocation 1,000,000
(xvii) Huntingdon Readiness Center
(A) Provide original furniture and
equipment for Huntingdon Readiness
Center
Project Allocation 1,000,000
(xviii) Lebanon Readiness Center
(A) Provide original furniture and
equipment for Lebanon Readiness Center
Project Allocation 1,000,000
(xix) Lewisburg Readiness Center
(A) Provide original furniture and
equipment for Lewisburg Readiness
Center
Project Allocation 1,000,000
(xx) Lewistown Readiness Center
(A) Provide original furniture and
equipment for Lewistown Readiness
Center
Project Allocation 1,000,000
(xxi) Luzerne County Readiness Centers
(A) Provide original furniture and
equipment for Luzerne Readiness
Centers
Project Allocation 5,000,000
(xxii) Philadelphia/Delaware Counties
(A) Provide original furniture and
equipment for Philadelphia/Delaware
County Readiness Centers
20210SB0915PN1157 - 102 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 4,000,000
(xxiii) Punxsutawney Readiness Center
(A) Provide original furniture and
equipment for Punxsutawney Readiness
Center
Project Allocation 500,000
(xxiv) South Mountain Readiness Center
(A) Provide original furniture and
equipment for South Mountain Readiness
Center
Project Allocation 500,000
(xxv) Tamaqua Readiness Center
(A) Provide original furniture and
equipment for Tamaqua Readiness Center
Project Allocation 1,000,000
(xxvi) Wellsboro Readiness Center
(A) Provide original furniture and
equipment for Wellsboro Readiness
Center
Project Allocation 1,000,000
(5) State System of Higher Education
(i) Edinboro University
(A) Provide original furniture and
equipment for Hamilton Hall renovation
Project Allocation 2,500,000
(ii) Shippensburg University
(A) Provide original furniture and
equipment for Heiges Field House
renovation and addition
Project Allocation 4,000,000
20210SB0915PN1157 - 103 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(B) Original furniture and equipment for
Old Main renovation
Project Allocation 1,500,000
(7) Department of Transportation
(i) Adams County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(ii) Allegheny County
(A) Provide original furniture and
equipment for District Office 11-0
Project Allocation 2,000,000
(B) Provide original furniture and
equipment for maintenance facilities
Project Allocation 1,200,000
(iii) Armstrong County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(iv) Beaver County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(v) Bedford County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(vi) Berks County
(A) Provide original furniture and
equipment for maintenance facility
20210SB0915PN1157 - 104 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 600,000
(vii) Blair County
(A) Provide original furniture and
equipment for District Office 9-0
Project Allocation 2,000,000
(B) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(viii) Bradford County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(ix) Bucks County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(x) Butler County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xi) Cambria County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xii) Cameron County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xiii) Carbon County
(A) Provide original furniture and
20210SB0915PN1157 - 105 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
equipment for maintenance facility
Project Allocation 600,000
(xiv) Centre County
(A) Provide original furniture and
equipment for maintenance facilities
Project Allocation 1,200,000
(xv) Chester County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xvi) Clarion County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xvii) Clearfield County
(A) Provide original furniture and
equipment for District Office 2-0
Project Allocation 2,000,000
(B) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xviii) Clinton County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xix) Columbia County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xx) Crawford County
20210SB0915PN1157 - 106 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Provide original furniture and
equipment for maintenance facilities
Project Allocation 1,200,000
(xxi) Cumberland County
(A) Provide original furniture and
equipment for maintenance facilities
Project Allocation 1,200,000
(xxii) Dauphin County
(A) Provide original furniture and
equipment for District Office 8-0
Project Allocation 2,000,000
(B) Provide original furniture and
equipment for maintenance facilities
Project Allocation 1,200,000
(xxiii) Delaware County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xxiv) Elk County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xxv) Erie County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xxvi) Fayette County
(A) Provide original furniture and
equipment for District Office 12-0
Project Allocation 2,000,000
20210SB0915PN1157 - 107 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(B) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xxvii) Forrest County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xxviii) Franklin County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xxix) Fulton County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xxx) Greene County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xxxi) Huntingdon County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xxxii) Indiana County
(A) Provide original furniture and
equipment for District Office 10-0
Project Allocation 2,000,000
(B) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
20210SB0915PN1157 - 108 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(xxxiii) Jefferson County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xxxiv) Juniata County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xxxv) Lackawanna County
(A) Provide original furniture and
equipment for District Office 4-0
Project Allocation 2,000,000
(B) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xxxvi) Lancaster County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xxxvii) Lawrence County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xxxviii) Lebanon County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xxxix) Lehigh County
(A) Provide original furniture and
equipment for District Office 5-0
20210SB0915PN1157 - 109 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 2,000,000
(B) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xl) Luzerne County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xli) Lycoming County
(A) Provide original furniture and
equipment for District Office 3-0
Project Allocation 2,000,000
(B) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xlii) McKean County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xliii) Mercer County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xliv) Mifflin County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xlv) Monroe County
(A) Provide original furniture and
equipment for maintenance facility
20210SB0915PN1157 - 110 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 600,000
(xlvi) Montgomery County
(A) Provide original furniture and
equipment for District Office 6-0
Project Allocation 2,000,000
(B) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xlvii) Montour County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xlviii) Northampton County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xlix) Northumberland County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(l) Perry County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(li) Philadelphia County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(lii) Pike County
(A) Provide original furniture and
20210SB0915PN1157 - 111 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
equipment for maintenance facility
Project Allocation 600,000
(liii) Potter County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(liv) Schuylkill County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(lv) Snyder County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(lvi) Somerset County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(lvii) Sullivan County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(lviii) Susquehanna County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(lix) Tioga County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
20210SB0915PN1157 - 112 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(lx) Union County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(lxi) Venango County
(A) Provide original furniture and
equipment for District Office 1-0
Project Allocation 2,000,000
(B) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(lxii) Warren County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(lxiii) Washington County
(A) Provide original furniture and
equipment for maintenance facilities
Project Allocation 1,200,000
(lxiv) Wayne County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(lxv) Westmoreland County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(lxvi) Wyoming County
(A) Provide original furniture and
equipment for maintenance facility
20210SB0915PN1157 - 113 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 600,000
(lxvii) York County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
Section 5. Itemization of transportation assistance projects.
(a) Mass transit.--Additional capital projects in the
category of transportation assistance projects for mass transit
in which an interest is to be acquired or constructed by the
Department of Transportation, its successors or assigns and to
be financed by the incurring of debt are hereby itemized,
together with their estimated financial costs, as follows:
Project
Total Project
Allocation
(1) York County
(i) York County Economic Alliance
(A) Acquisition, construction,
infrastructure, abatement of hazardous
materials, rehabilitation and other
related costs for public transit
modernization in York County
Project Allocation 8,000,000
(b) Rural and intercity rail.--Additional capital projects
in the category of transportation assistance projects for rural
and intercity rail service projects to be constructed or with
respect to which an interest is to be acquired by the Department
of Transportation, its successors or assigns and to be financed
by the incurring of debt are hereby itemized, together with
their respective estimated financial costs, as follows:
Total Project
20210SB0915PN1157 - 114 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation
(1) Clearfield County
(i) County projects
(A) Acquisition, construction,
infrastructure and other related costs
for rehabilitation of the rail line
known as the Clearfield Cluster
located in Cambria, Centre,
Clearfield, Clinton and Indiana
Counties, including railbed, ties,
rail and other materials to support
business growth and improve safety
Project Allocation 15,000,000
(2) Luzerne County
(i) Newport Township
(A) Acquisition, construction and
infrastructure for a rail extension
for the Newport Township Energy Park
Project Allocation 5,000,000
(3) Somerset County
(i) County projects
(A) Construction and rehabilitation of
rail at the Cambria Branch Rail Line
Project Allocation 7,000,000
(4) Multiple Counties
(i) Redevelopment Authority of County of
Berks
(A) Acquisition, construction,
infrastructure, rehabilitation and
other related costs for the
20210SB0915PN1157 - 115 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Colebrookdale Railroad Preservation
Trust/Eastern Berks Gateway Railroad
Project Allocation 30,000,000
(ii) Bradford and Wyoming Counties
(A) Acquisition, construction,
infrastructure and other related costs
for rehabilitation of rail line,
including railbed, ties, rail and
other materials to support business
growth and improve safety
Project Allocation 5,000,000
(iii) Reading Blue Mountain and Northern
Railroad
(A) Construction, infrastructure,
rehabilitation and other related costs
for reconstruction by process of crop
and weld of 28 miles of heavy control-
cooled 136-pound main line rail from
Pittston (MP 3.59) to Mehoopany (MP
31.74) and reconstruction of the
Mehoopany yard to facilitate the
construction of a manufacturing plant
north of Mehoopany and the movement of
newly manufactured products for
international export
Project Allocation 3,300,000
(c) Air transportation.--Additional capital projects in the
category of transportation assistance projects for air
transportation service to which an interest is to be acquired by
the Department of Transportation, its successors or assigns and
20210SB0915PN1157 - 116 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
to be financed by the incurring of debt are hereby itemized,
together with their respective estimated financial costs, as
follows:
Project
Total Project
Allocation
(1) Blair County
(i) Blair County Airport Authority
(A) Acquisition, infrastructure,
rehabilitation,construction and other
related costs for economic development
of business and aviation facilities
and infrastructure at the Altoona-
Blair County Airport
Project Allocation 5,000,000
(2) Cumberland County
(i) South Middleton Township
(A) Acquisition, renovation,
construction, infrastructure and other
related costs for improvement,
expansion, redevelopment and
revitalization of the Carlisle Airport
Project Allocation 20,000,000
(3) Dauphin County
(i) Susquehanna Area Regional Airport
Authority
(A) Construction, infrastructure,
rehabilitation, abatement of hazardous
materials and other related costs for
the long-term parking lot at
Harrisburg International Airport
20210SB0915PN1157 - 117 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 3,000,000
(4) Lancaster County
(i) Lancaster Airport Authority
(A) Acquisition of aviation fueling
vehicles
Project Allocation 125,000
(B) Acquisition, construction,
rehabilitation and other related costs
for airport maintenance and
construction equipment and a storage
facility
Project Allocation 500,000
(C) Construction, infrastructure,
abatement of hazardous materials and
other related costs for relocation of
the Aircraft Fuel Farm
Project Allocation 2,000,000
(D) Construction, infrastructure,
rehabilitation and other related costs
for airport infrastructure
improvements, including parking, HVAC
and other building services
Project Allocation 2,500,000
(E) Construction, infrastructure,
rehabilitation and other related costs
for airport development and
improvement, including hangars,
aircraft and vehicle parking and
associated facilities
Project Allocation 2,500,000
20210SB0915PN1157 - 118 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(F) Construction, infrastructure,
rehabilitation and other related costs
for site development and construction
of T-hangars and offices
Project Allocation 3,500,000
(G) Construction, infrastructure,
rehabilitation and other related costs
for site development and construction
of corporate hangars and offices
Project Allocation 20,000,000
(5) Lawrence County
(i) Lawrence County Economic Development
Corporation
(A) Acquisition, construction,
renovation, abatement of hazardous
materials, infrastructure and other
related costs for capacity expansion
at the New Castle Municipal Airport in
Union Township
Project Allocation 10,000,000
(6) Luzerne County
(i) Wilkes-Barre Wyoming Valley Airport
(A) Construction, infrastructure and
other related costs for improvements
at the Wyoming Valley Airport
Project Allocation 5,000,000
(7) Mercer County
(i) Borough of Grove City
(A) Acquisition, construction,
infrastructure and other related costs
20210SB0915PN1157 - 119 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
for aviation, industrial and
commercial site development and
improvements at or surrounding the
Grove City Regional Airport
Project Allocation 1,000,000
Section 6. Itemization of redevelopment assistance projects.
Additional capital projects in the category of redevelopment
assistance projects for capital grants by the Department of
Community and Economic Development, its successors or assigns,
authorized under the provisions of the act of May 20, 1949
(P.L.1633, No.493), known as the Housing and Redevelopment
Assistance Law, and redevelopment assistance capital projects
and to be financed by the incurring of debt, are hereby
itemized, together with their estimated financial costs, as
follows:
Project
Total Project
Allocation
(1) Adams County
(i) (Reserved)
(2) Allegheny County
(i) (Reserved)
(ii) Moon Transportation Authority
(A) Construction, infrastructure,
redevelopment, rehabilitation,
environmental remediation and other
related costs for development projects
along Stevenson Mill and Rouser Road
Connectors and adjacent areas in Moon
Township
Project Allocation 5,000,000
20210SB0915PN1157 - 120 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(iii) Allegheny County Airport Authority
(A) Acquisition, construction,
infrastructure, redevelopment,
rehabilitation, environmental
remediation and other related costs
for the development of industrial and
commercial sites at or surrounding
Pittsburgh International Airport
Project Allocation 50,000,000
(iv) Pittsburgh Gateways Corporation
(A) Construction, infrastructure,
redevelopment, rehabilitation and
other related costs for the second
floor of the historic Energy
Innovation Center
Project Allocation 1,200,000
(v) Bethel Park Borough
(A) Construction, rehabilitation and
other related costs for the
improvement of the Irishtown,
Patterson and Logan intersection with
a roundabout
Project Allocation 1,300,000
(B) Construction, infrastructure,
redevelopment, rehabilitation and
other related costs for the expansion
of the Montour Trail and construction
of sidewalks for pedestrians
Project Allocation 600,000
(vi) Borough of Jefferson Hills
20210SB0915PN1157 - 121 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Acquisition, construction,
infrastructure and other related costs
for consolidation of existing and
outdated fire stations into a new
facility
Project Allocation 1,000,000
(vii) South Fayette Township
(A) Construction, infrastructure,
redevelopment and other related costs
for a municipal complex, police
station and administration offices
Project Allocation 6,000,000
(viii) South Park Township
(A) Construction, infrastructure,
redevelopment rehabilitation and other
related costs for an addition to
existing building
Project Allocation 500,000
(B) Construction, redevelopment,
rehabilitation and other related costs
for the reconstruction of Route 88 and
Brownsville Road intersection,
including sidewalks
Project Allocation 800,000
(3) Armstrong County
(i) County projects
(A) Site development, construction and
other related costs for relocation of
the ARC Manor residential facility to
property in the West Hills Industrial
20210SB0915PN1157 - 122 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Park
Project Allocation 2,000,000
(B) Acquisition, infrastructure,
construction and other related costs
for an on-campus, assisted
living/senior housing facility
adjacent to the Armstrong Center for
Medicine and Health (ACMH), including
expansion, acquisition of properties
and buildings, renovations and
equipment upgrades at ACMH facilities
Project Allocation 10,000,000
(4) Beaver County
(i) County projects
(A) Construction, infrastructure and
other related costs for public works
building and fire station in Big
Beaver Borough
Project Allocation 500,000
(ii) Beaver County Corporation for Economic
Development
(A) Infrastructure, site improvements and
other related costs for construction
of compressed natural gas fueling
facility
Project Allocation 1,000,000
(B) Acquisition, infrastructure,
abatement of hazardous materials,
construction and other related costs
for redevelopment of industrial
20210SB0915PN1157 - 123 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
properties located within Ellwood City
Project Allocation 15,000,000
(C) Acquisition, infrastructure,
abatement of hazardous materials,
construction and other related costs
for redevelopment and improvement of
industrial sites located within Potter
Township
Project Allocation 15,000,000
(iii) Redevelopment Authority of Beaver
County
(A) Renovation and rehabilitation of
patient rooms and corridors at
Heritage Valley Beaver Hospital
facility
Project Allocation 1,000,000
(B) Rehabilitation, construction and
other related costs for renovations to
radiology department at Heritage
Valley Beaver Hospital facility
Project Allocation 1,000,000
(iv) Baden Borough
(A) Acquisition, construction,
infrastructure, redevelopment and
other related costs for Baden Academy
Charter School expansion project
Project Allocation 5,000,000
(v) Ellwood City Borough
(A) Acquisition, construction,
infrastructure, redevelopment,
20210SB0915PN1157 - 124 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
abatement of hazardous materials and
other related costs for redevelopment
projects
Project Allocation 15,000,000
(vi) Harmony Township
(A) Construction, infrastructure and
other related costs for CNG conversion
project
Project Allocation 1,000,000
(B) Acquisition, construction,
infrastructure, redevelopment and
other related costs for an industrial
park
Project Allocation 20,000,000
(5) Bedford County
(i) County projects
(A) Acquisition, construction,
reconstruction, rehabilitation,
renovation, environmental and/or
hazardous assessment and remediation,
infrastructure improvements, including
improvements related to energy,
transportation, parking and common
areas, and other related costs for the
Mission Critical Solutions Expansion
project
Project Allocation 750,000
(ii) Bedford County Development Association
(A) Acquisition, construction,
infrastructure, redevelopment,
20210SB0915PN1157 - 125 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
rehabilitation, environmental
remediation and other related costs
for economic development projects in
the county
Project Allocation 5,000,000
(B) Acquisition, construction,
reconstruction, rehabilitation,
renovation, environmental and/or
hazardous assessment and remediation,
infrastructure improvements, including
improvements related to energy,
transportation, parking and common
areas, and all other related costs for
the development, expansion,
renovation, redevelopment, reuse,
historic preservation and/or green
development of a community development
project
Project Allocation 5,000,000
(6) Berks County
(i) County projects
(A) Construction, infrastructure,
redevelopment and other related costs
for a St. Luke's Medical Office
Building in Ontelaunee Township
Project Allocation 5,000,000
(ii) Berks County Redevelopment Authority
(A) Acquisition, construction,
infrastructure, redevelopment and
other related costs for sewer related
20210SB0915PN1157 - 126 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
services extension for the Blue Rock
Bowman Business Center
Project Allocation 3,000,000
(B) Redevelopment, infrastructure,
construction and other related costs
for a business expansion project in
the county
Project Allocation 10,000,000
(C) Rehabilitation, infrastructure,
renovation, abatement of hazardous
materials, construction and other
related costs for redevelopment of
Titus Station, a 200 acre industrial
zoned property in the county
Project Allocation 10,000,000
(iii) Ontelaunee Township
(A) Design, demolition, construction,
infrastructure, abatement of hazardous
materials, machinery and equipment and
other related costs for a copper
tubing manufacturing facility
Project Allocation 3,000,000
(7) Blair County
(i) County projects
(A) Acquisition, construction,
reconstruction, rehabilitation,
renovation, environmental and
hazardous assessment and remediation,
infrastructure improvements related to
energy, transportation, parking and
20210SB0915PN1157 - 127 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
common areas, and other related costs
for expansion, historic preservation
and development of Conemaugh Nason
Medical Center
Project Allocation 5,000,000
(B) Acquisition, construction,
restoration, historic preservation and
other related costs for a rail
heritage development project with the
Railroaders Memorial Museum
Project Allocation 40,000,000
(8) Bradford County
(i) (Reserved)
(9) Bucks County
(i) (Reserved)
(ii) Bucks County Industrial Development
Authority
(A) Construction, infrastructure,
renovation and other related costs for
water, sewer, commercial and
industrial projects in Bensalem
Township
Project Allocation 3,000,000
(B) Acquisition, construction,
infrastructure and abatement of
hazardous materials for a mixed-use
development project in Quakertown
Borough
Project Allocation 5,000,000
(C) Acquisition of land and other related
20210SB0915PN1157 - 128 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
costs for future construction and
manufacturing expansion at the Klover
III Panel Shop
Project Allocation 5,000,000
(D) Acquisition, construction and other
related costs for future construction
of a crane-served building for
increased engineering-related and
manufacturing-related job expansion at
the Klover III Panel Shop
Project Allocation 11,000,000
(iii) Redevelopment Authority of the County
of Bucks
(A) Infrastructure, redevelopment,
renovation, rehabilitation and other
related costs to repurpose a former
military site in Warminster Township
Project Allocation 5,000,000
(B) Infrastructure, redevelopment and
other related costs for an economic
development project along the Delaware
River in Bensalem Township
Project Allocation 5,000,000
(C) Construction, redevelopment,
renovation and other related costs for
a historic building in Bristol Borough
Project Allocation 500,000
(D) Construction, redevelopment and
infrastructure for the installation of
curbs and sidewalks and storm water
20210SB0915PN1157 - 129 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
management in Bensalem Township
Project Allocation 5,000,000
(E) Construction, redevelopment,
rehabilitation and other related costs
for the Mill Race Inn site in
Northampton Township
Project Allocation 3,000,000
(F) Acquisition, construction,
infrastructure, hazardous material
remediation and other related costs
for the Neshaminy Mall site in
Bensalem Township
Project Allocation 10,000,000
(G) Acquisition and construction for
corporate headquarters development
project in Bensalem Township
Project Allocation 10,000,000
(H) Acquisition, rehabilitation,
infrastructure, flood mitigation and
associated costs for a riverfront
redevelopment project
Project Allocation 10,000,000
(iv) Bensalem Township
(A) Construction and other related costs
for the installation of a new drainage
infrastructure project for the
Bensalem Township Country Club
Project Allocation 1,000,000
(B) Construction and renovation of a
recreational facility located in the
20210SB0915PN1157 - 130 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
township
Project Allocation 1,000,000
(v) Bristol Borough
(A) Acquisition, construction and
infrastructure for a new consolidated
fire station in the borough
Project Allocation 1,500,000
(vi) Bristol Township
(A) Infrastructure, construction and
other related costs for a new fire and
rescue services building in the
township
Project Allocation 2,500,000
(vii) Lower Southampton Township
(A) Construction, renovation and other
related costs for projects at a
swimming complex located in the
township
Project Allocation 1,000,000
(viii) Middletown Township
(A) Infrastructure, construction,
demolition, abatement of hazardous
materials and other related costs for
redevelopment of the township's
Department of Public Works yard and
facilities
Project Allocation 5,000,000
(ix) Warwick Township
(A) Construction of sidewalks and street
frontages in the township
20210SB0915PN1157 - 131 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 1,500,000
(10) Butler County
(i) County projects
(A) Site preparation, environmental
remediation, development and
redevelopment, infrastructure,
construction and other related costs
for economic development in the county
Project Allocation 15,000,000
(ii) Butler County Community Development
Corporation
(A) Acquisition, infrastructure,
abatement of hazardous materials,
rehabilitation, construction and other
related costs for a Bantam Jeep Events
Center
Project Allocation 2,000,000
(iii) Cranberry Township
(A) Construction, acquisition,
infrastructure, redevelopment,
abatement of hazardous materials and
other related costs for expansion and
improvement of the Kawneer facilities
Project Allocation 10,000,000
(B) Acquisition, construction,
infrastructure, rehabilitation,
environmental remediation and other
related costs for parks, recreational
and open space in the township
Project Allocation 2,000,000
20210SB0915PN1157 - 132 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(C) Acquisition, construction,
infrastructure, rehabilitation,
environmental remediation and other
related costs for economic development
projects in the township
Project Allocation 5,000,000
(D) Acquisition, construction,
infrastructure, rehabilitation,
environmental remediation and other
related costs for the Cranberry
Township Municipal Center
Project Allocation 2,500,000
(E) Acquisition, construction,
infrastructure, rehabilitation,
environmental remediation and other
related costs for township-owned
facilities
Project Allocation 5,000,000
(iv) Slippery Rock Township
(A) Acquisition, infrastructure,
renovation, redevelopment,
construction and other related costs
for Slippery Rock University
Foundation development
Project Allocation 1,500,000
(v) Zelienople Borough
(A) Construction, infrastructure,
redevelopment and other related costs
for development of Sensory House
Museum on Glade Run's Zelienople
20210SB0915PN1157 - 133 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
campus for individuals with autism and
other developmental disabilities
Project Allocation 1,000,000
(11) Cambria County
(i) County projects
(A) Acquisition, construction,
infrastructure, abatement of hazardous
materials, equipment upgrades and
other related costs for expansion of a
community dental center
Project Allocation 2,500,000
(B) Acquisition, construction,
reconstruction, rehabilitation,
renovation, environmental and/or
hazardous assessment and remediation,
infrastructure improvements, including
improvements related to energy,
transportation, parking and common
areas, and other related costs for a
cultural, civic and historical
community development project
Project Allocation 5,000,000
(C) Acquisition, construction,
reconstruction, rehabilitation,
renovation, environmental and/or
hazardous assessment and remediation,
infrastructure improvements, including
improvements related to energy,
transportation, parking and common
areas, and other related costs for a
20210SB0915PN1157 - 134 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
regional economic development project
Project Allocation 5,000,000
(D) Acquisition, construction,
reconstruction, rehabilitation,
renovation, environmental and
hazardous assessment and remediation,
infrastructure improvements related to
energy, transportation, parking and
common areas, and other related costs
for expansion, historic preservation
and development of Conemaugh Health
System
Project Allocation 5,000,000
(E) Acquisition, construction,
reconstruction, rehabilitation,
renovation, environmental and/or
hazardous assessment and remediation,
infrastructure improvements, including
improvements related to energy,
transportation, parking and common
areas, and other related costs for an
economic development project at John
Murtha Johnstown-Cambria County
Airport
Project Allocation 5,000,000
(F) Acquisition, construction,
reconstruction, rehabilitation,
renovation, environmental and/or
hazardous assessment and remediation,
infrastructure improvements, including
20210SB0915PN1157 - 135 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
improvements related to energy,
transportation, parking and common
areas, and other related costs for an
infrastructure and facility
improvement project at Saint Francis
University
Project Allocation 7,500,000
(ii) Cresson Township
(A) Acquisition, construction,
demolition, renovation,
rehabilitation, infrastructure and
other related costs for the Mount
Aloysius College campus
Project Allocation 10,000,000
(12) Cameron County
(i) (Reserved)
(13) Carbon County
(i) County projects
(A) Construction, site development,
infrastructure and other related costs
for an educational facility located at
Lehigh Carbon Community College
Project Allocation 4,000,000
(B) Acquisition, construction,
renovation, infrastructure and other
related costs for expansion of the
Carbon County Correctional facility
Project Allocation 5,000,000
(C) Acquisition, demolition,
construction, site development,
20210SB0915PN1157 - 136 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
infrastructure improvements and other
related costs for economic development
projects in the county
Project Allocation 7,500,000
(D) Acquisition, demolition,
construction, infrastructure
improvements and other related costs
to repurpose sites within Nesquehoning
Borough
Project Allocation 10,000,000
(E) Construction, infrastructure,
abatement of hazardous materials and
other related costs for
rehabilitation, renovation, equipment
and expansion of the county Human
Services building
Project Allocation 2,500,000
(ii) Reading Blue Mountain and Northern
Railroad
(A) Acquisition, redevelopment,
rehabilitation and other related costs
for renovation of buildings and
grounds of the Nesquehoning plant to
support anthracite coal shipping
domestically and internationally
Project Allocation 1,000,000
(14) Centre County
(i) (Reserved)
(ii) Moshannon Valley Economic Development
Partnership, Inc.
20210SB0915PN1157 - 137 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Construction and other related costs
for a new Moshannon Valley Emergency
Medical Services ambulance
headquarters building
Project Allocation 2,000,000
(15) Chester County
(i) (Reserved)
(16) Clarion County
(i) County projects
(A) Acquisition, infrastructure,
equipment, abatement of hazardous
materials, construction and other
related costs for upgrades and
improvements to the Modern Living
Solutions site
Project Allocation 2,500,000
(17) Clearfield County
(i) (Reserved)
(ii) Clearly Ahead - Clearfield County
Economic Development Corporation
(A) Infrastructure, redevelopment and
other related costs for design and
construction of a shell building in
Curwensville Borough
Project Allocation 2,000,000
(B) Infrastructure, redevelopment and
other related costs for design and
construction of a shell building in
Lawrence Township
Project Allocation 2,250,000
20210SB0915PN1157 - 138 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(18) Clinton County
(i) (Reserved)
(19) Columbia County
(i) County projects
(A) Acquisition, infrastructure,
redevelopment, abatement of hazardous
materials, construction and other
related costs for a cultural, civic or
historical project in the county
Project Allocation 5,000,000
(B) Acquisition, infrastructure,
redevelopment, abatement of hazardous
materials, construction and other
related costs for an economic
development project in the county
Project Allocation 10,000,000
(ii) Columbia County Housing and
Redevelopment Authorities
(A) Acquisition, infrastructure,
redevelopment, abatement of hazardous
materials, construction and other
related costs for expansion of the
Berwick YMCA, including space for a
basketball court and additional
parking
Project Allocation 2,000,000
(20) Crawford County
(i) (Reserved)
(ii) Economic Progress Alliance of Crawford
County
20210SB0915PN1157 - 139 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Acquisition, construction,
infrastructure, site planning, storm
water management, abatement of
hazardous materials and other related
costs for phases of development at the
Cochranton Community Services Complex
Project Allocation 1,000,000
(B) Acquisition, construction,
infrastructure, site planning, storm
water management, abatement of
hazardous materials and other related
costs for phases of development at the
Linesville Business Park
Project Allocation 2,000,000
(C) Land and right-of-way acquisition,
planning, permitting, rehabilitation,
construction and other related costs
for economic development projects in
and around the Keystone Regional
Industrial Park and surrounding
regional areas
Project Allocation 20,000,000
(D) Acquisition, construction,
infrastructure and other related costs
for redevelopment and expansion of
Meadville Medical Center
Project Allocation 25,000,000
(iii) Borough of Conneaut Lake
(A) Construction, infrastructure,
redevelopment and other related costs
20210SB0915PN1157 - 140 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
for revitalization of the downtown
business district
Project Allocation 4,000,000
(21) Cumberland County
(i) County projects
(A) Site preparation, acquisition,
renovation, construction,
redevelopment, infrastructure and
other related costs for redevelopment
and/or expansion of Williams Grove
Historical Steam Engine site
Project Allocation 2,500,000
(ii) Cumberland Area Economic Development
Corporation
(A) Acquisition, demolition, site
preparation, environmental
remediation, infrastructure,
construction and other related costs
for redevelopment and renovation of
the Central Penn College campus
Project Allocation 5,000,000
(B) Acquisition, demolition, site
preparation, environmental
remediation, infrastructure,
construction and other related costs
for a redevelopment and renovation
project in Silver Spring Township
Project Allocation 5,000,000
(C) Acquisition, demolition, site
preparation, environmental
20210SB0915PN1157 - 141 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
remediation, infrastructure,
construction and other related costs
for a freestanding rehabilitation
hospital located in Hampden Township
Project Allocation 10,000,000
(iii) Cumberland County Industrial
Development Authority
(A) Acquisition, demolition, site
preparation, environmental
remediation, infrastructure,
construction and other related costs
for redevelopment and renovation of
the historic Penn Harris Hotel located
in East Pennsboro Township
Project Allocation 5,000,000
(iv) Susquehanna Area Regional Airport
Authority
(A) Acquisition, construction,
infrastructure, redevelopment,
rehabilitation, environmental
remediation and other related costs
for safety improvements and economic
development at Capital City Airport
Project Allocation 1,500,000
(v) Hampden Township
(A) Acquisition, demolition, site
preparation, environmental
remediation, infrastructure,
construction and other related costs
for redevelopment and renovation of
20210SB0915PN1157 - 142 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
the Hampden Township Municipal Pool
Project Allocation 2,000,000
(vi) Mechanicsburg Borough
(A) Acquisition, demolition, site
preparation, environmental
remediation, infrastructure,
construction and other related costs
for redevelopment of the Mechanicsburg
Borough Downtown Partnership project
Project Allocation 2,500,000
(vii) Silver Spring Township
(A) Acquisition, demolition, site
preparation, environmental
remediation, infrastructure,
construction and other related costs
for redevelopment and renovation of
the Hempt Farms
Project Allocation 10,000,000
(viii) South Middletown Township
(A) Acquisition, renovation,
construction, infrastructure and other
related costs for a community
revitalization and economic
development project in the township
Project Allocation 5,000,000
(22) Dauphin County
(i) County projects
(A) Site preparation, acquisition,
remediation, renovation, construction,
redevelopment, infrastructure and
20210SB0915PN1157 - 143 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
other related costs for development of
a PA Agriculture Discovery Center
attraction
Project Allocation 10,000,000
(ii) Redevelopment Authority of Harrisburg
(A) Acquisition, rehabilitation,
construction, infrastructure and other
related costs for economic development
and growth of Harrisburg businesses
Project Allocation 10,000,000
(iii) Harrisburg Land Bank
(A) Acquisition, construction,
infrastructure, abatement of hazardous
materials and other related costs for
rehabilitation and development along
Paxton Creek
Project Allocation 5,000,000
(iv) Lower Paxton Township
(A) Acquisition, construction,
infrastructure, redevelopment,
renovation, abatement of hazardous
materials and other related costs for
a beverage production/processing
facility and venue
Project Allocation 2,500,000
(v) West Hanover Township
(A) Acquisition, site preparation,
infrastructure, construction,
redevelopment, renovation, abatement
of hazardous materials and other
20210SB0915PN1157 - 144 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
related costs for construction of a
municipal complex facility
Project Allocation 5,000,000
(23) Delaware County
(i) (Reserved)
(ii) Delaware County Redevelopment Authority
(A) Construction, infrastructure,
rehabilitation and other costs for
Riddle Hospital in Middletown Township
Project Allocation 10,000,000
(24) Elk County
(i) (Reserved)
(ii) Bradford Office of Economic and
Community Development
(A) Construction, infrastructure and
other related costs for a new three
story building in downtown St. Marys
relocation of offices, meeting spaces
and treatment program areas
Project Allocation 2,100,000
(25) Erie County
(i) (Reserved)
(ii) Corry Area Industrial Development
Corporation
(A) Acquisition, infrastructure,
construction, redevelopment,
renovation, rehabilitation and other
related costs for projects on vacant
industrial facilities for one or more
manufacturing units
20210SB0915PN1157 - 145 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 5,000,000
(iii) Erie-Western Pennsylvania Port
Authority
(A) Acquisition, infrastructure,
construction, redevelopment, abatement
of hazardous materials, renovation,
rehabilitation and other related costs
for existing and proposed waterfront
development
Project Allocation 30,000,000
(iv) Erie County Redevelopment Authority
(A) Acquisition, infrastructure,
construction, redevelopment, abatement
of hazardous materials, renovation,
rehabilitation and other related costs
for properties to promote development
Project Allocation 5,000,000
(B) Acquisition, infrastructure,
construction, abatement of hazardous
materials, renovation, rehabilitation
and other related costs for
redevelopment of properties within the
City of Corry to promote development
Project Allocation 5,000,000
(v) Erie Redevelopment Authority
(A) Construction, renovation,
rehabilitation and other related costs
for upgrades at senior care community
Project Allocation 1,500,000
(vi) Redevelopment Authority in the City of
20210SB0915PN1157 - 146 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Corry
(A) Infrastructure, construction,
redevelopment, renovation,
rehabilitation and other related costs
for upgrades to multitenant
manufacturing facilities
Project Allocation 7,500,000
(vii) Borough of Union City
(A) Acquisition, infrastructure,
construction, redevelopment,
renovation, rehabilitation, abatement
of hazardous materials and other
related costs for improvements and
restoration to previous industrial
sites
Project Allocation 500,000
(B) Acquisition, infrastructure,
construction and other related costs
for the development of a trail system
Project Allocation 500,000
(viii) City of Erie
(A) Infrastructure, construction and
other related costs for public space
improvements
Project Allocation 5,000,000
(B) Infrastructure, construction,
redevelopment, renovation,
rehabilitation and other related costs
for improvements to firehouses and
police stations and creation of a
20210SB0915PN1157 - 147 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
joint public safety facility
Project Allocation 15,000,000
(C) Acquisition, infrastructure,
construction, redevelopment,
renovation, rehabilitation and other
related costs for development of
sports complexes
Project Allocation 10,000,000
(26) Fayette County
(i) (Reserved)
(ii) Fay-Penn Economic Development Council
(A) Acquisition, infrastructure,
construction and other related costs
for countywide economic development
Project Allocation 25,000,000
(27) Forest County
(i) (Reserved)
(28) Franklin County
(i) (Reserved)
(ii) Franklin County Redevelopment Authority
(A) Acquisition, site preparation,
renovation, rehabilitation,
infrastructure, construction and other
related costs for development of Phase
II of Herbruck's Poultry Ranch and
Blue Springs Egg Farm expansion
Project Allocation 5,000,000
(29) Fulton County
(i) (Reserved)
(30) Greene County
20210SB0915PN1157 - 148 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(i) County projects
(A) Acquisition, redevelopment,
infrastructure, construction and other
related costs for a Center for
Economic Development facility and
resources to build research, workforce
readiness, social wellness, vocational
and career development, and support
educational initiatives, including
early childhood education
Project Allocation 5,000,000
(B) Acquisition, construction, site
preparation, infrastructure and other
related costs for community and
economic development projects in the
county
Project Allocation 30,000,000
(ii) Perry Township
(A) Renovation and construction of the
township building
Project Allocation 1,000,000
(31) Huntingdon County
(i) County projects
(A) Acquisition, renovation,
redevelopment, infrastructure,
abatement of hazardous materials,
construction and other related costs
for expansion of Health and Wellness
facilities of the Broad Top Area
Medical Center, Inc.
20210SB0915PN1157 - 149 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 7,000,000
(32) Indiana County
(i) County projects
(A) Acquisition, infrastructure,
construction, renovation, abatement of
hazardous materials and other related
costs for Phase II rehabilitation of
the Indiana County Education and
Technology Center
Project Allocation 5,000,000
(B) Acquisition, infrastructure,
construction, renovation, abatement of
hazardous materials and other related
costs for capital projects, including
recreational facilities and County
Fair Ground buildings at Mack Park
Project Allocation 5,000,000
(C) Acquisition, infrastructure,
construction, renovation, abatement of
hazardous materials and other related
costs for capital projects, including
recreational and aquatic facilities at
the YMCA of Indiana County
Project Allocation 5,000,000
(D) Acquisition, construction,
reconstruction, rehabilitation,
renovation, environmental and/or
hazardous assessment and remediation,
infrastructure improvements, including
improvements related to energy,
20210SB0915PN1157 - 150 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
transportation, parking and common
areas, and other related costs for
historic preservation and/or
redevelopment and blight remediation
Project Allocation 8,000,000
(E) Acquisition, rehabilitation,
infrastructure, construction and other
related costs for business park site
improvements and multitenant building
development at Windy Ridge Business &
Technology Park - Phases 3 through 5
Project Allocation 10,000,000
(F) Acquisition, rehabilitation,
infrastructure improvements,
construction and other related costs
for expansion of community healthcare
services and educational & training
partnerships through the Indiana
Regional Medical Center
Project Allocation 15,000,000
(G) Acquisition, construction,
reconstruction, rehabilitation,
renovation, environmental and/or
hazardous assessment and remediation,
infrastructure improvements, including
improvements related to energy,
transportation, parking and common
areas, and other related costs for
historic preservation and/or green
development in the county
20210SB0915PN1157 - 151 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 75,000,000
(33) Jefferson County
(i) (Reserved)
(34) Juniata County
(i) (Reserved)
(ii) Juniata County Industrial Development
Authority
(A) Development of natural gas
infrastructure in the Juniata County
Industrial Park, including
construction, remediation, landscaping
and other related costs for future
expansion in the park
Project Allocation 1,000,000
(B) Development of Phase V of the Juniata
County Industrial Park, including
grading, landscaping, construction of
an access road, utilities, storm water
management and all ancillary
construction for pad ready lots
Project Allocation 5,000,000
(35) Lackawanna County
(i) (Reserved)
(36) Lancaster County
(i) County projects
(A) Acquisition, site development,
construction, infrastructure,
redevelopment, equipment, abatement of
hazardous materials and other related
costs for the development of the PA
20210SB0915PN1157 - 152 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Agriculture Discovery Center
Project Allocation 10,000,000
(ii) Lancaster County Redevelopment Authority
(A) Acquisition, redevelopment,
renovation, construction,
infrastructure and other related costs
for economic development projects in
the county
Project Allocation 15,000,000
(B) Acquisition, redevelopment,
renovation, construction,
infrastructure and other related costs
for economic development of an
agriculture education facility that
supports manufacturing and
demonstration projects
Project Allocation 12,500,000
(C) Acquisition, redevelopment,
renovation, construction,
infrastructure and other related costs
for Lancaster Life Sciences Incubator
Project Allocation 10,000,000
(D) Acquisition, redevelopment,
renovation, construction,
infrastructure, abatement of hazardous
materials and other related costs for
emergency medical services program
Project Allocation 5,000,000
(E) Acquisition, redevelopment,
renovation, construction,
20210SB0915PN1157 - 153 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
infrastructure, equipment and other
related costs for modernization and
expansion of the Schreiber Center for
Pediatric Development
Project Allocation 4,000,000
(F) Acquisition, site preparation,
redevelopment, renovation,
construction, infrastructure and other
related costs for the development of
the Brookside Medical Campus
Project Allocation 4,000,000
(iii) City of Lancaster
(A) Acquisition, design, demolition,
redevelopment, renovation,
construction, infrastructure,
abatement of hazardous materials and
other related costs for Lancaster
Stockyards Surgical Center
Project Allocation 10,000,000
(iv) East Cocalico Township
(A) Acquisition, design, demolition,
redevelopment, renovation,
construction, infrastructure,
abatement of hazardous materials,
machinery, equipment and other related
costs for improvements to roadway and
utility, including streetscape
enhancements
Project Allocation 15,000,000
(v) Lititz Regional Community Development
20210SB0915PN1157 - 154 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Corporation
(A) Acquisition, design, demolition,
redevelopment, construction,
infrastructure, abatement of hazardous
materials, machinery, equipment and
other related costs for improvements
to roadway and utility, including
streetscape enhancements for Live
Event Museum
Project Allocation 20,000,000
(B) Acquisition, design, demolition,
redevelopment, construction,
infrastructure, abatement of hazardous
materials, machinery, equipment and
other related costs for improvements
to roadway and utility, including
streetscape enhancements for economic
development project in Warwick
Township
Project Allocation 15,000,000
(C) Acquisition, design, demolition,
redevelopment, construction,
infrastructure, abatement of hazardous
materials, machinery, equipment and
other related costs for improvements
to roadway and utility, including
streetscape enhancements for community
asset project in Warwick Township
Project Allocation 15,000,000
(D) Acquisition, design, demolition,
20210SB0915PN1157 - 155 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
redevelopment, construction,
infrastructure, abatement of hazardous
materials, machinery, equipment and
other related costs for improvements
to roadway and utility, including
streetscape enhancements for economic
development project for Elizabeth
Township
Project Allocation 15,000,000
(E) Acquisition, design, demolition,
redevelopment, construction,
infrastructure, abatement of hazardous
materials, machinery, equipment and
other related costs for improvements
to roadway and utility, including
streetscape enhancements for economic
development project in Elizabeth
Township
Project Allocation 15,000,000
(F) Acquisition, design, demolition,
redevelopment, construction,
infrastructure, abatement of hazardous
materials, machinery, equipment and
other related costs for improvements
to roadway and utility, including
streetscape enhancements for economic
development project in Lititz Borough
Project Allocation 15,000,000
(G) Acquisition, design, demolition,
redevelopment, construction,
20210SB0915PN1157 - 156 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
infrastructure, abatement of hazardous
materials, machinery, equipment and
other related costs for improvements
to roadway and utility, including
streetscape enhancements for community
asset project in Lititz Borough
Project Allocation 15,000,000
(vi) Mount Joy Borough
(A) Acquisition, redevelopment,
construction, infrastructure,
renovation and other related costs for
expansion project at the Janus School
Project Allocation 3,000,000
(vii) Mount Joy Township
(A) Acquisition, design, demolition,
redevelopment, construction,
infrastructure, abatement of hazardous
materials, machinery, equipment and
other related costs for improvements
to roadway and utility, including
streetscape enhancements for economic
development project
Project Allocation 15,000,000
(viii) Penn Township
(A) Acquisition, site preparation,
redevelopment, renovation,
construction, infrastructure and other
related costs for expansion of
Pleasant View Communities
Project Allocation 5,000,000
20210SB0915PN1157 - 157 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(ix) Strasburg Borough
(A) Renovation, rehabilitation and
construction protecting a National
Registered Historic District providing
for economic development
Project Allocation 1,000,000
(37) Lawrence County
(i) (Reserved)
(ii) Lawrence County Economic Development
Corporation
(A) Acquisition, construction,
renovation, abatement of hazardous
materials, infrastructure and other
related costs for an
Incubator/Makerspace
Project Allocation 7,500,000
(B) Acquisition, construction,
renovation, abatement of hazardous
materials, infrastructure and other
related costs for county
agribusinesses
Project Allocation 7,500,000
(C) Acquisition, construction,
renovation, abatement of hazardous
materials, infrastructure and other
related costs for an economic
development project in Mahoning
Township
Project Allocation 10,000,000
(D) Acquisition, construction,
20210SB0915PN1157 - 158 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
renovation, abatement of hazardous
materials, infrastructure and other
related costs for an economic
development project in Neshannock
Township
Project Allocation 10,000,000
(E) Acquisition, construction,
renovation, abatement of hazardous
materials, infrastructure and other
related costs for an economic
development project in New Beaver
Borough
Project Allocation 10,000,000
(F) Acquisition, construction,
renovation, abatement of hazardous
materials, infrastructure and other
related costs for an economic
development project in New Wilmington
Borough
Project Allocation 10,000,000
(G) Acquisition, construction,
renovation, abatement of hazardous
materials, infrastructure and other
related costs for an economic
development project in North Beaver
Township
Project Allocation 10,000,000
(H) Acquisition, construction,
renovation, abatement of hazardous
materials, infrastructure and other
20210SB0915PN1157 - 159 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
related costs for an economic
development project in Pulaski
Township
Project Allocation 10,000,000
(I) Acquisition, construction,
renovation, abatement of hazardous
materials, infrastructure and other
related costs for an economic
development project in Shenango
Township
Project Allocation 10,000,000
(J) Acquisition, construction,
renovation, abatement of hazardous
materials, infrastructure and other
related costs for an economic
development project in Taylor Township
Project Allocation 10,000,000
(K) Acquisition, construction,
renovation, abatement of hazardous
materials, infrastructure and other
related costs for an economic
development project in Union Township
Project Allocation 10,000,000
(L) Acquisition, construction,
renovation, abatement of hazardous
materials, infrastructure and other
related costs for an economic
development project in Volant Borough
Project Allocation 10,000,000
(M) Acquisition, construction,
20210SB0915PN1157 - 160 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
renovation, abatement of hazardous
materials, infrastructure and other
related costs for an economic
development project in Wampum Borough
Project Allocation 10,000,000
(N) Acquisition, construction,
renovation, abatement of hazardous
materials, infrastructure and other
related costs for an economic
development project in Wayne Township
Project Allocation 10,000,000
(O) Acquisition, construction,
renovation, abatement of hazardous
materials, infrastructure and other
related costs for an economic
development project in Wilmington
Township
Project Allocation 10,000,000
(P) Acquisition, construction,
renovation, abatement of hazardous
materials, infrastructure and other
related costs for an economic
development project in Bessemer
Borough
Project Allocation 10,000,000
(Q) Acquisition, construction,
renovation, abatement of hazardous
materials, infrastructure and other
related costs for an economic
development project in Little Beaver
20210SB0915PN1157 - 161 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Township
Project Allocation 10,000,000
(R) Acquisition, construction,
renovation, abatement of hazardous
materials, infrastructure and other
related costs for an economic
development project in Ellwood City
Borough
Project Allocation 10,000,000
(S) Acquisition, construction,
renovation, abatement of hazardous
materials, infrastructure and other
related costs for an economic
development project in the City of New
Castle
Project Allocation 10,000,000
(T) Acquisition, construction,
renovation, abatement of hazardous
materials, infrastructure and other
related costs for an economic
development project in the county
Project Allocation 12,500,000
(U) Acquisition, construction,
renovation, abatement of hazardous
materials, infrastructure and other
related costs for expansion of an
historical facility in the City of New
Castle
Project Allocation 13,000,000
(V) Acquisition, construction,
20210SB0915PN1157 - 162 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
renovation, abatement of hazardous
materials, infrastructure and other
related costs for a cultural facility
project in the county
Project Allocation 13,000,000
(W) Acquisition, construction,
infrastructure and other related costs
for the Baird Road business park
economic development project in
Mahoning Township
Project Allocation 20,000,000
(38) Lebanon County
(i) County projects
(A) Site preparation, acquisition,
renovation, construction,
infrastructure and other related costs
for development of the Annville
Logistics Park
Project Allocation 5,000,000
(B) Acquisition, site preparation,
renovation, redevelopment,
construction, infrastructure,
abatement of hazardous materials and
other related costs for development of
Wellspan Health healthcare facilities
Project Allocation 5,000,000
(ii) City of Lebanon
(A) Acquisition, infrastructure,
abatement of hazardous materials,
construction and other related costs
20210SB0915PN1157 - 163 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
for urban revitalization, including
façade improvements in the commercial
corridors of 9
th
and Lehman Streets
Project Allocation 10,000,000
(39) Lehigh County
(i) County projects
(A) Construction, infrastructure
redevelopment and other related costs
for restoration and repair of the
Scottish Rite Cathedral in the City of
Allentown
Project Allocation 1,000,000
(B) Construction, renovation,
acquisition and other related costs
for an early childhood education
center in the City of Allentown
Project Allocation 10,000,000
(C) Acquisition, construction,
infrastructure improvements and other
related costs for the D&L Trail
Project Allocation 10,000,000
(D) Acquisition, construction,
infrastructure, renovation and other
related costs for an economic
development project in the county
Project Allocation 15,000,000
(E) Acquisition, construction,
infrastructure, renovation and other
related costs for an economic
development project in the City of
20210SB0915PN1157 - 164 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Allentown
Project Allocation 15,000,000
(ii) City of Allentown
(A) Construction infrastructure
improvements and other related costs
for renovation and rehabilitation of a
former convent located on Hanover
Avenue
Project Allocation 500,000
(B) Construction infrastructure
improvements and other related costs
for interior and exterior upgrades to
the Agri-Plex building
Project Allocation 500,000
(iii) North Whitehall Township
(A) Construction, facility improvements,
renovations and other related costs
for KidsPeace Orchard Hills campus
Project Allocation 2,000,000
(iv) Upper Macungie Township
(A) Construction, redevelopment,
infrastructure and other related costs
for a new community center, including
indoor sports and recreation areas,
meeting space, a walking track and
rental space
Project Allocation 10,000,000
(40) Luzerne County
(i) County projects
(A) Acquisition, construction,
20210SB0915PN1157 - 165 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
redevelopment, renovation,
rehabilitation, infrastructure and
other related costs for an economic
development project
Project Allocation 10,000,000
(B) Construction, redevelopment,
renovation, rehabilitation,
infrastructure and other related costs
associated with improvements to Kirby
Park
Project Allocation 5,000,000
(C) Acquisition, construction,
redevelopment, renovation,
rehabilitation, infrastructure, site
improvements, abatement of hazardous
materials and other related costs
associated with the Hazleton Creek
economic development project
Project Allocation 5,000,000
(D) Acquisition, construction,
redevelopment, renovation,
rehabilitation, infrastructure and
other related costs associated with
the expansion of a commercial property
located on Route 315 in Plains
Township
Project Allocation 5,000,000
(E) Acquisition, construction,
redevelopment, renovation,
rehabilitation, infrastructure, site
20210SB0915PN1157 - 166 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
improvements, abatement of hazardous
materials and other related costs
associated with the construction of a
new animal shelter
Project Allocation 3,000,000
(F) Renovation, rehabilitation and other
related costs to repair and restore
the Luzerne County Courthouse
Project Allocation 1,000,000
(G) Acquisition, construction,
infrastructure, redevelopment and
other related costs for a sustainable
energy project for production of
renewable fuels
Project Allocation 10,000,000
(ii) City of Hazleton
(A) Acquisition, construction,
redevelopment, renovation,
rehabilitation, infrastructure,
abatement of hazardous materials,
machinery, equipment and other related
costs for a Lehigh Valley Health
Network facility
Project Allocation 10,000,000
(B) Acquisition, construction,
redevelopment, renovation,
rehabilitation, infrastructure,
abatement of hazardous materials, site
improvements and other related costs
associated with an economic
20210SB0915PN1157 - 167 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
development project
Project Allocation 5,000,000
(iii) City of Nanticoke
(A) Acquisition, construction,
redevelopment, renovation,
rehabilitation, infrastructure,
abatement of hazardous materials, site
improvements and other related costs
associated with an economic
development project
Project Allocation 10,000,000
(B) Acquisition, construction,
redevelopment, renovation,
rehabilitation, infrastructure,
abatement of hazardous materials, site
improvements and other related costs
associated with the redevelopment of
the LS site project
Project Allocation 10,000,000
(iv) City of Wilkes-Barre
(A) Acquisition, construction,
redevelopment, renovation,
rehabilitation, abatement of hazardous
materials and other related costs
associated with Wilkes University
facilities
Project Allocation 5,000,000
(B) Acquisition, construction,
redevelopment, renovation,
rehabilitation, infrastructure,
20210SB0915PN1157 - 168 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
abatement of hazardous materials and
other related costs associated with an
economic development project
Project Allocation 5,000,000
(C) Acquisition, construction,
redevelopment, renovation,
rehabilitation, infrastructure and
other related costs related to the
improvement of facilities for the
Wilkes-Barre YMCA
Project Allocation 2,500,000
(v) Edwardsville Borough
(A) Acquisition, construction,
redevelopment, renovation,
rehabilitation, infrastructure, site
improvements and other related costs
associated with an energy sector
economic development project
Project Allocation 20,000,000
(B) Acquisition, construction,
redevelopment, renovation,
rehabilitation, infrastructure, site
improvements and other related costs
associated with a manufacturing or
technology incubator project
Project Allocation 2,000,000
(vi) Exeter Borough
(A) Construction, infrastructure and
other related costs for an economic
development and job creation project
20210SB0915PN1157 - 169 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 15,000,000
(B) Acquisition, construction,
redevelopment, renovation,
rehabilitation, infrastructure,
abatement of hazardous materials and
other related costs associated with
the redevelopment of a commercial
property on Wyoming Avenue
Project Allocation 5,000,000
(vii) Greater Wilkes-Barre Industrial Fund
(A) Acquisition, construction,
redevelopment, renovation,
rehabilitation, infrastructure and
other related costs for the Jewish
Community Center of Northeastern
Pennsylvania
Project Allocation 10,000,000
(B) Acquisition, construction,
redevelopment, renovation,
rehabilitation, infrastructure and
other related costs for the Wyoming
Valley Art League
Project Allocation 3,000,000
(viii) Hanover Township
(A) Acquisition, construction,
redevelopment, renovation,
rehabilitation, infrastructure,
abatement of hazardous materials, site
preparation and other related costs
associated with an economic
20210SB0915PN1157 - 170 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
development project
Project Allocation 5,000,000
(ix) Luzerne Borough
(A) Construction, renovation,
rehabilitation, infrastructure and
other related costs associated with an
infrastructure project that includes
deploying sound barriers to address
recent development
Project Allocation 1,500,000
(x) Newport Township
(A) Acquisition, construction,
redevelopment, renovation,
rehabilitation, infrastructure,
abatement of hazardous materials, site
preparation and other related costs
associated with the development of an
energy park
Project Allocation 20,000,000
(B) Site preparation, acquisition,
renovation, construction,
redevelopment, infrastructure and
other related costs for repurposing
SCI Retreat for economic development
in the township
Project Allocation 10,000,000
(xi) Plains Township
(A) Acquisition, construction,
redevelopment, renovation,
rehabilitation, infrastructure,
20210SB0915PN1157 - 171 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
abatement of hazardous materials, site
preparation and other related costs
associated with an economic
development project
Project Allocation 5,000,000
(B) Acquisition, construction,
redevelopment, renovation,
rehabilitation, infrastructure,
abatement of hazardous materials, site
preparation and other related costs
associated with a multiuse sports
complex project
Project Allocation 5,000,000
(xii) Pittston City
(A) Acquisition, construction,
redevelopment, renovation,
rehabilitation, infrastructure,
abatement of hazardous materials, site
preparation and other related costs
associated with an economic
development project
Project Allocation 5,000,000
(xiii) Wilkes-Barre Township
(A) Acquisition, construction,
redevelopment, renovation,
rehabilitation, infrastructure,
abatement of hazardous materials, site
preparation and other related costs
associated with an economic
development project
20210SB0915PN1157 - 172 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 5,000,000
(41) Lycoming County
(i) County projects
(A) Acquisition, site development,
construction, infrastructure,
redevelopment, equipment, abatement of
hazardous materials and other related
costs for an economic development
project in the county
Project Allocation 10,000,000
(B) Acquisition, site development,
construction, infrastructure,
redevelopment, equipment, abatement of
hazardous materials and other related
costs for an open space, trail,
tourism and outdoor recreation project
in the county
Project Allocation 10,000,000
(42) McKean County
(i) (Reserved)
(43) Mercer County
(i) County projects
(A) Acquisition, construction,
infrastructure and abatement of
hazardous materials at the former
Damascus-Bishop Tube Facility in the
Reynolds Industrial Park
Project Allocation 1,500,000
(B) Acquisition, construction,
infrastructure and other related costs
20210SB0915PN1157 - 173 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
for facilities development
Project Allocation 4,400,000
(C) Acquisition, construction,
infrastructure, redevelopment,
abatement of hazardous materials and
other related costs for an industrial
facility
Project Allocation 2,000,000
(D) Construction, infrastructure and
other related costs for a workforce
development center to be built
Project Allocation 2,225,000
(E) Acquisition, construction,
redevelopment and infrastructure for a
new multitenant healthcare facility
Project Allocation 2,000,000
(F) Construction and/or renovation of a
multitenant facility in the Reynolds
Industrial Park
Project Allocation 1,000,000
(ii) Greenville Area Economic Development
Corporation
(A) Acquisition, construction,
redevelopment, infrastructure and
abatement of hazardous materials for
the former Trinity Industries site in
Hempfield Township
Project Allocation 3,000,000
(iii) Greenville-Reynolds Development
Corporation
20210SB0915PN1157 - 174 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Construction, infrastructure and
other related costs to erect three
versatile commercial buildings in
industrial parks within the county
Project Allocation 2,000,000
(iv) Penn-Northwest Development Corporation
(A) Construction, renovation and
infrastructure costs related to the
conversion of the Sacred Heart Church
and rectory into a community theater
Project Allocation 1,500,000
(B) Acquisition and renovation of an
industrial manufacturing facility
known as the Trinity South Plant
Project Allocation 1,000,000
(C) Construction, renovation,
infrastructure and related costs for
the expansion of the HopeCAT facility
Project Allocation 2,500,000
(D) Construction, renovation and
infrastructure for modernization of
fire prevention, chemical storage and
overall facility upgrades to the
Jamestown Coatings plant
Project Allocation 1,000,000
(E) Construction, redevelopment,
infrastructure and abatement of
hazardous materials for the expansion
of NLMK's operation
Project Allocation 5,000,000
20210SB0915PN1157 - 175 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(F) Renovation of all or part of four
buildings on East State Street and
Chestnut Street in the City of Sharon
as part of the redevelopment of
Shenango Riverfront
Project Allocation 2,000,000
(G) Construction, infrastructure and
other related cost for a community
wellness center on the Thiel College
Campus
Project Allocation 5,000,000
(v) Borough of Grove City
(A) Acquisition, construction,
infrastructure and other related costs
for an industrial facility
Project Allocation 1,000,000
(B) Acquisition, construction,
infrastructure and other related costs
for commercial facilities
Project Allocation 1,000,000
(vi) City of Hermitage
(A) Acquisition, construction and
infrastructure improvements for a
business park project
Project Allocation 3,000,000
(B) Acquisition, construction,
infrastructure and related
improvements for a Hermitage community
and economic development project
Project Allocation 2,500,000
20210SB0915PN1157 - 176 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(C) Acquisition, construction,
infrastructure and related
improvements for a Hermitage community
recreational facilities project
Project Allocation 3,000,000
(D) Acquisition, construction, renovation
and infrastructure improvements for an
industrial facility
Project Allocation 3,500,000
(vii) City of Sharon
(A) Acquisition, construction,
infrastructure, redevelopment and
other related costs for the
development of the commercial corridor
of the city
Project Allocation 3,000,000
(B) Acquisition, construction and
redevelopment of the Shenango
Riverbanks within the city
Project Allocation 500,000
(C) Infrastructure, construction and
other related costs for the WaterFire
Sharon riverbank development
Project Allocation 400,000
(44) Mifflin County
(i) County projects
(A) Acquisition, construction, site
preparation, infrastructure and other
related costs for a community and
economic development project in the
20210SB0915PN1157 - 177 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
county
Project Allocation 25,000,000
(ii) Mifflin County Industrial Development
Authority
(A) Abatement of hazardous materials,
demolition and redevelopment of
abandoned building number four located
in the MCIDC Plaza
Project Allocation 1,000,000
(45) Monroe County
(i) (Reserved)
(ii) Monroe County Industrial Development
Authority
(A) Construction, infrastructure and
other related costs for redevelopment
of the Chelsea property
Project Allocation 5,000,000
(B) Construction, infrastructure and
other related costs for development of
an industrial property on Airstrip
Road
Project Allocation 5,000,000
(C) Construction, infrastructure and
other related costs for development of
a commercial site on Sullivan Trail
Project Allocation 3,000,000
(D) Construction, infrastructure and
other related costs for redevelopment
of the former Birchwood Resort
property
20210SB0915PN1157 - 178 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 5,000,000
(E) Construction, infrastructure and
other related costs for redevelopment
of the site of the former Mount Pocono
Golf Course
Project Allocation 5,000,000
(F) Construction, infrastructure and
other related costs for redevelopment
of an industrial property on North
Road
Project Allocation 5,000,000
(G) Construction, infrastructure and
other related costs for redevelopment
of an industrial property located at
303 Possinger Drive
Project Allocation 5,000,000
(H) Construction, infrastructure and
other related costs for redevelopment
of property located at 142 Quarry Lane
Project Allocation 3,000,000
(I) Construction, infrastructure and
other related costs for development of
the Lynch Corporation property
Project Allocation 3,000,000
(J) Construction, infrastructure and
other related costs for redevelopment
of the former HJ Davis property
Project Allocation 3,000,000
(iii) Borough of East Stroudsburg
(A) Construction, infrastructure,
20210SB0915PN1157 - 179 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
renovation and other related costs for
improvements to the East Stroudsburg
University athletic and academic
facilities
Project Allocation 10,000,000
(iv) Pocono Township
(A) Construction, infrastructure,
renovation and other related costs for
the Center for Advanced Technology and
Sustainability at the Northampton
Community College Monroe campus
Project Allocation 2,500,000
(46) Montgomery County
(i) (Reserved)
(ii) Pottstown Area Industrial Development,
Inc.
(A) Construction, rehabilitation,
renovation, rehabilitation and other
related costs for the Hard Hat Cherry
Street improvement project
Project Allocation 500,000
(B) Construction, infrastructure,
equipment and other related costs for
the American Keg Company deep draw
press project
Project Allocation 1,000,000
(C) Construction, rehabilitation,
abatement of hazardous materials and
other related costs for renovation,
remediation and redevelopment of the
20210SB0915PN1157 - 180 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
former Pottstown Plating Works
property
Project Allocation 1,250,000
(D) Construction, redevelopment and other
related costs for the Iron Globe
Entertainment Complex project
Project Allocation 5,000,000
(47) Montour County
(i) County projects
(A) Acquisition, infrastructure,
redevelopment, abatement of hazardous
materials, construction and other
related costs for a cultural, civic or
historical project in the county
Project Allocation 5,000,000
(B) Acquisition, infrastructure,
redevelopment, abatement of hazardous
materials, construction and other
related costs for an economic
development project in the county
Project Allocation 10,000,000
(48) Northampton County
(i) County projects
(A) Construction, renovation
infrastructure and redevelopment of
the Nazareth YMCA
Project Allocation 3,500,000
(B) Construction, infrastructure and
other related costs for a multipurpose
indoor and outdoor sports complex in
20210SB0915PN1157 - 181 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
the Lehigh Valley
Project Allocation 9,500,000
(ii) Bangor Area Commercial and Industrial
Development Authority
(A) Acquisition, construction,
infrastructure and other related cots
for redevelopment and site
improvements to the former Portland
Power Plant
Project Allocation 11,000,000
(iii) Hanover Township
(A) Construction, infrastructure and
other related costs for nonhighway
roads and other infrastructure at the
Majestic Business Park at the Lehigh
Valley International Airport
Project Allocation 20,000,000
(iv) Upper Mount Bethel Township
(A) Acquisition, construction,
infrastructure and other related costs
for development of River Pointe
Commerce Center
Project Allocation 25,000,000
(49) Northumberland County
(i) County projects
(A) Acquisition, infrastructure,
redevelopment, abatement of hazardous
materials, construction and other
related costs for a cultural, civic or
historical project in the county
20210SB0915PN1157 - 182 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 5,000,000
(B) Acquisition, infrastructure,
redevelopment, abatement of hazardous
materials, construction and other
related costs for an economic
development project in the county
Project Allocation 10,000,000
(ii) DRIVE - Economic Development
Pennsylvania
(A) Acquisition, infrastructure,
redevelopment, abatement of hazardous
materials, construction and other
related costs for construction of an
industrial facility
Project Allocation 5,000,000
(iii) City of Sunbury
(A) Acquisition, infrastructure,
redevelopment, abatement of hazardous
materials, construction and other
related costs for redevelopment of the
former Sunbury Textile facility
Project Allocation 3,000,000
(B) Acquisition, infrastructure,
redevelopment, abatement of hazardous
materials, construction and other
related costs for redevelopment of the
former Sunbury Community Hospital site
Project Allocation 5,000,000
(C) Acquisition, infrastructure,
redevelopment, abatement of hazardous
20210SB0915PN1157 - 183 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
materials, construction and other
related costs for consolidation of the
fire companies within the city
Project Allocation 5,000,000
(50) Perry County
(i) County projects
(A) Construction, infrastructure,
acquisition and other related
development costs for an economic
development project in the county
Project Allocation 10,000,000
(B) Construction, infrastructure,
acquisition and other related
development costs for a new Government
Center
Project Allocation 10,000,000
(51) Philadelphia County
(i) County projects
(A) Design, infrastructure, abatement of
hazardous materials and construction
of an academic/administrative
building, including utility upgrades
and extensions, site improvements and
code-related upgrades, including ADA
compliance-related upgrades, at the
main campus of Temple University
Project Allocation 250,000,000
(B) Design, infrastructure, abatement of
hazardous materials and construction
of an academic/administrative
20210SB0915PN1157 - 184 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
building, including utility upgrades
and extensions, site improvements and
code-related upgrades, including ADA
compliance-related upgrades, at the
main campus of Temple University
Project Allocation 185,000,000
(52) Pike County
(i) County projects
(A) Acquisition, construction,
infrastructure, redevelopment,
abatement of hazardous materials and
other related costs for an economic
development project in the county
Project Allocation 10,000,000
(53) Potter County
(i) (Reserved)
(54) Schuylkill County
(i) County projects
(A) Acquisition, construction,
infrastructure, machinery, equipment
and other related costs for a Lehigh
Valley Health Network facility
Project Allocation 10,000,000
(ii) City of Pottsville
(A) Acquisition, infrastructure,
construction, renovation and other
related costs for development of a
farmers market
Project Allocation 500,000
(B) Acquisition, infrastructure,
20210SB0915PN1157 - 185 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
construction, renovation and other
related costs for a streetscape
project, including stormwater
management, façade improvements,
landscaping, lighting, parking lots,
restrooms and streetscape improvements
Project Allocation 5,000,000
(C) Acquisition, infrastructure,
construction, renovation and other
related costs for development of
downtown properties and streetscape
improvements
Project Allocation 5,000,000
(D) Acquisition, infrastructure,
construction, renovation and other
related costs for historic housing
revitalization
Project Allocation 5,000,000
(iii) Tamaqua Borough
(A) Infrastructure, rehabilitation and
other related costs for development of
a live-work space entrepreneurial
center with high-speed fiber optic
Internet service
Project Allocation 2,500,000
(iv) Schuylkill Economic Development
Corporation
(A) Redevelopment and construction of an
industrial shell building at Rush
Township Industrial Park
20210SB0915PN1157 - 186 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 1,500,000
(B) Acquisition, infrastructure,
construction, utility extensions and
roadway improvements for development
of a Schuylkill Airport Industrial
Park
Project Allocation 2,000,000
(C) Redevelopment and construction of
commercial and industrial buildings at
Highridge Industrial Park
Project Allocation 2,000,000
(D) Acquisition, infrastructure,
construction and other related costs
for a rehabilitation of the former
Ashland State Hospital complex to
retrofit into a multipurpose facility
Project Allocation 2,000,000
(E) Rehabilitation, infrastructure and
other related costs for construction
of additional buildings and expansion
at an industrial complex
Project Allocation 20,000,000
(55) Snyder County
(i) County projects
(A) Acquisition, infrastructure,
redevelopment, abatement of hazardous
materials, construction and other
related costs for renovations of a
county-owned facility
Project Allocation 2,000,000
20210SB0915PN1157 - 187 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(B) Acquisition, infrastructure,
redevelopment, abatement of hazardous
materials, construction and other
related costs for a cultural, civic or
historical project in the county
Project Allocation 5,000,000
(C) Acquisition, infrastructure,
redevelopment, abatement of hazardous
materials, construction and other
related costs for an economic
development project in the county
Project Allocation 10,000,000
(56) Somerset County
(i) County projects
(A) Acquisition, construction,
reconstruction, rehabilitation,
renovation, environmental and/or
hazardous assessment and remediation,
infrastructure improvements, including
improvements related to energy,
transportation, parking and common
areas, and other related costs for
historic preservation and/or green
development of Conemaugh Health System
facilities
Project Allocation 5,000,000
(57) Sullivan County
(i) (Reserved)
(58) Susquehanna County
(i) County projects
20210SB0915PN1157 - 188 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Acquisition, construction,
infrastructure, redevelopment,
abatement of hazardous materials and
other related costs for an economic
development project in the county
Project Allocation 10,000,00
(59) Tioga County
(i) (Reserved)
(60) Union County
(i) County projects
(A) Acquisition, infrastructure,
rehabilitation, redevelopment,
construction and other related costs
for the Evangelical Community Hospital
Project Allocation 10,000,000
(61) Venango County
(i) County projects
(A) Construction and other related costs
for renovations to the dementia wing
of a senior care facility
Project Allocation 1,000,000
(B) Acquisition, construction,
infrastructure, abatement of hazardous
materials, equipment upgrades and
other related costs for expansion of a
community dental center
Project Allocation 2,500,000
(62) Warren County
(i) (Reserved)
(63) Washington County
20210SB0915PN1157 - 189 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(i) County projects
(A) Acquisition, construction,
infrastructure, redevelopment,
renovation, rehabilitation, abatement
of hazardous materials and other
related costs for a community and
economic development project in the
county
Project Allocation 25,000,000
(B) Acquisition, construction,
reconstruction, rehabilitation,
renovation, environmental and/or
hazardous assessment and remediation,
infrastructure improvements, including
improvements related to energy,
transportation, parking and common
areas, and all other related costs for
the development, expansion,
renovation, redevelopment, reuse,
historic preservation and/or green
development of an alternative energy
facility in Robinson Township
Project Allocation 10,000,000
(ii) Redevelopment Authority of the County of
Washington
(A) Construction, renovation,
rehabilitation and infrastructure
costs for capital improvements to the
Washington Wild Things park
Project Allocation 10,000,000
20210SB0915PN1157 - 190 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(B) Acquisition, demolition,
infrastructure, abatement of hazardous
materials, renovation, rehabilitation,
construction and other related costs
for a blight remediation project at
the intersection of Main and Chestnut
streets in the City of Washington
Project Allocation 5,000,000
(C) Acquisition, construction,
renovation, rehabilitation, abatement
of hazardous materials, redevelopment,
infrastructure, other related costs
and economic development projects for
Arc Human Services, Inc. in Canonsburg
Borough
Project Allocation 3,000,000
(D) Acquisition, construction,
renovation, rehabilitation, abatement
of hazardous materials, redevelopment,
infrastructure, other related costs
and economic development projects for
Arc Human Services, Inc. in the City
of Washington
Project Allocation 3,000,000
(E) Acquisition, construction,
renovation, rehabilitation,
infrastructure and other related costs
for a capital construction project
that will include a visitors' center
at Meadowcroft Rockshelter and
20210SB0915PN1157 - 191 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Historic Village
Project Allocation 2,000,000
(iii) City of Washington
(A) Construction, renovation,
rehabilitation, redevelopment and
other related costs for a community
center renovation project at
Transitional Paths to Independent
Living (TRPIL)
Project Allocation 1,500,000
(iv) Midway Borough
(A) Acquisition, construction,
renovation, rehabilitation,
demolition, redevelopment and other
related costs for a project to
relocate the existing municipal
building
Project Allocation 1,000,000
(v) North Strabane Township
(A) Acquisition, construction,
renovation, rehabilitation and other
related costs for a new public safety
building
Project Allocation 4,100,000
(vi) Peters Township
(A) Redevelopment, infrastructure and
other related costs for a spillway
enhancement project for the dam at
Peters Lake Park
Project Allocation 2,500,000
20210SB0915PN1157 - 192 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(B) Acquisition, construction,
redevelopment, infrastructure and
other related costs for the
construction of a new fire substation
and the purchase of a new fire engine
Project Allocation 2,500,000
(64) Wayne County
(i) County projects
(A) Acquisition, construction,
infrastructure, redevelopment,
abatement of hazardous materials and
other related costs for an economic
development project in the county
Project Allocation 10,000,000
(65) Westmoreland County
(i) County projects
(A) Acquisition, construction,
infrastructure, redevelopment,
renovation, rehabilitation and other
related costs for an economic
development project in the county as
identified in the 2018 comprehensive
plan "Reimagining Our Westmoreland"
Project Allocation 25,000,000
(B) Acquisition, construction,
renovation, infrastructure
improvements and other related costs
for a community or economic
development project or initiative
Project Allocation 25,000,000
20210SB0915PN1157 - 193 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(C) Construction, demolition, site and
material abatement, site
predevelopment activities,
redevelopment, renovation,
rehabilitation, infrastructure and
other related costs to replace a roof;
repair, replace or separate utilities;
establish multitenant corridors;
construct multitenant truck courts;
and construct new buildings
Project Allocation 20,000,000
(D) Acquisition, construction,
demolition, renovation,
rehabilitation, redevelopment,
infrastructure and other related costs
for the development of a convention
center as a priority project for the
comprehensive plan "Reimagining Our
Westmoreland"
Project Allocation 10,000,000
(E) Acquisition, construction,
redevelopment, renovation,
rehabilitation, infrastructure
improvements and other related costs
for a facility to house a medical
school for the Lake Erie College of
Osteopathic Medicine (LECOM)
Project Allocation 10,000,000
(F) Acquisition, construction,
demolition, renovation,
20210SB0915PN1157 - 194 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
rehabilitation, abatement of hazardous
materials, infrastructure and other
related costs for the Seton Hill
University campus
Project Allocation 10,000,000
(G) Acquisition, redevelopment,
construction, renovation,
rehabilitation, infrastructure
extensions and improvements and other
related costs for an economic
development project along or near US
Route 22
Project Allocation 5,000,000
(ii) Redevelopment Authority of the County of
Westmoreland
(A) Acquisition, construction,
redevelopment, abatement of hazardous
materials and other related costs to
adaptively reuse a three-story
building in the City of Monessen
Project Allocation 7,500,000
(B) Acquisition, construction,
redevelopment, infrastructure,
abatement of hazardous materials and
other related costs to redevelop a
brownfield site in Trafford Borough
Project Allocation 3,500,000
(C) Acquisition, construction,
redevelopment, infrastructure,
abatement of hazardous materials and
20210SB0915PN1157 - 195 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
other related costs to redevelop a
former steel plant facility in the
City of Latrobe
Project Allocation 1,500,000
(D) Acquisition, construction,
redevelopment, infrastructure,
abatement of hazardous materials and
other related costs to redevelop a
former metal roll manufacturing
facility in Avonmore Borough
Project Allocation 1,500,000
(E) Acquisition, construction,
redevelopment, abatement of hazardous
materials and other related costs to
redevelop a former glass plant in
Hempfield Township
Project Allocation 1,500,000
(F) Acquisition, construction,
redevelopment, abatement of hazardous
materials and other related costs for
the adaptive reuse of a former five-
story bank building in the City of
Jeannette
Project Allocation 1,500,000
(G) Construction, redevelopment,
abatement of hazardous materials and
other related costs to redevelop a
site in Mount Pleasant Borough
Project Allocation 500,000
(H) Acquisition, demolition,
20210SB0915PN1157 - 196 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
redevelopment, abatement of hazardous
materials and other related costs to
redevelop a site in East Huntingdon
Township
Project Allocation 500,000
(I) Acquisition, construction,
redevelopment, abatement of hazardous
materials and other related costs to
redevelop a former brewing facility in
Smithton Borough
Project Allocation 500,000
(J) Construction, redevelopment,
abatement of hazardous materials and
other related costs to adaptively
reuse a former trolley barn in Derry
Borough
Project Allocation 500,000
(K) Acquisition, construction,
infrastructure, redevelopment,
renovation and other related costs for
facilities at AHN Hempfield
Neighborhood Hospital
Project Allocation 10,000,000
(iii) Economic Growth Connection of
Westmoreland
(A) Acquisition, construction,
renovation, rehabilitation,
infrastructure and other related costs
for a new aluminum manufacturing
innovation and technical center and
20210SB0915PN1157 - 197 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
new laboratory infrastructure
Project Allocation 7,000,000
(iv) Hempfield Township
(A) Acquisition, construction,
renovation, rehabilitation,
infrastructure and other related costs
for a new regional public safety
facility
Project Allocation 10,000,000
(v) Latrobe Industrial Development Authority
(A) Acquisition, construction,
renovation, rehabilitation,
redevelopment, infrastructure and
other related costs for the Saint
Vincent College community outreach
center in the City of Latrobe, other
facilities in the City of Latrobe and
facilities on the Saint Vincent
College campus
Project Allocation 5,000,000
(vi) Westmoreland County Industrial
Development Corporation
(A) Acquisition, construction,
infrastructure, redevelopment,
renovation, rehabilitation, abatement
of hazardous materials and other
related costs associated with the
improvement and expansion of the
Adelphoi campus and associated
facilities
20210SB0915PN1157 - 198 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 3,000,000
(66) Wyoming County
(i) County projects
(A) Acquisition, construction,
infrastructure, redevelopment,
abatement of hazardous materials and
other related costs for an economic
development project in the county
Project Allocation 10,000,000
(67) York County
(i) County projects
(A) Acquisition, site preparation,
redevelopment, renovation,
construction, infrastructure,
abatement of hazardous materials and
other related costs for development of
WellSpan Health healthcare facilities
Project Allocation 5,000,000
(ii) York County Economic Alliance
(A) Acquisition, redevelopment,
renovation, construction,
infrastructure, abatement of hazardous
materials and other related costs for
development of an outdoor economy site
for recreation
Project Allocation 4,000,000
(B) Acquisition, redevelopment,
renovation, construction,
infrastructure, abatement of hazardous
materials and other related costs for
20210SB0915PN1157 - 199 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
business expansion and development
within York County's Historic Trail
Towns communities
Project Allocation 4,000,000
(C) Acquisition, redevelopment,
renovation, construction,
infrastructure, abatement of hazardous
materials and other related costs for
historic preservation, restoration and
reuse of property located within the
City of York
Project Allocation 5,000,000
(D) Acquisition, redevelopment,
renovation, construction,
infrastructure, abatement of hazardous
materials and other related costs for
expansion and development of a
manufacturing facility
Project Allocation 5,000,000
(E) Acquisition, redevelopment,
renovation, construction,
infrastructure, abatement of hazardous
materials and other related costs for
historic preservation, restoration and
reuse of property located within the
Borough of Hanover
Project Allocation 5,000,000
(F) Acquisition, renovation,
construction, infrastructure,
abatement of hazardous materials and
20210SB0915PN1157 - 200 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
other related costs for redevelopment
of property for mixed use in a
strategic corridor of the county
Project Allocation 5,000,000
(G) Acquisition, redevelopment,
renovation, construction,
infrastructure, abatement of hazardous
materials and other related costs for
site redevelopment along the York
County Heritage Rail Trail
Project Allocation 5,000,000
(H) Acquisition, renovation,
construction, infrastructure,
abatement of hazardous materials and
other related costs for redevelopment
of property for mixed use along the
Codorus Innovation Corridor in the
City of York
Project Allocation 6,000,000
(I) Acquisition, renovation,
construction, infrastructure,
abatement of hazardous materials and
other related costs for nonprofit
redevelopment, modernization and
service enhancements throughout the
county
Project Allocation 10,000,000
(68) Multiple Counties
(i) Crawford, Erie, Mercer, Venango and
Warren Counties
20210SB0915PN1157 - 201 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Acquisition, construction,
infrastructure, redevelopment,
renovation and other related costs for
construction or improvement of a
regional juvenile detention facility
Project Allocation 25,000,000
Section 7. Itemization of flood control projects.
Additional capital projects in the category of flood control
projects to be constructed by the Department of Environmental
Protection, its successors or assigns and to be financed by the
incurring of debt are hereby itemized, together with their
respective estimated costs, as follows:
Project
Total Project
Allocation
(1) Department of Environmental Protection
(i) Allegheny County
(A) Construction, infrastructure and
other related costs for a storm water
line replacement, including storm
sewer, manhole and replacement of a
failing inlet, to reduce excessive
runoff and flooding in Ben Avon
Heights Borough
Project Allocation 50,000
(B) Construction, infrastructure and
other related costs for drainage
improvement and flood control on
Harmony Road in Ohio Township,
including installation of inlet boxes,
cast iron frames, safety grates,
20210SB0915PN1157 - 202 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
culvert piping, outlets, earth work
and wall erosion and sediment control
Project Allocation 158,000
(C) Construction, redevelopment and other
related costs for a detention pond
retrofit at Northridge, including
earth work, maintenance and protection
of traffic, culvert pipe installation,
outlet removal and removal and
replacement, erosion and sediment
control, fencing and landscape
restoration in Ohio Township
Project Allocation 169,000
(D) Construction, infrastructure and
other related costs for a pollutant
reduction plan project, including
storm water detention pond
improvements and sediment reduction in
South Fayette Township
Project Allocation 250,000
(E) Construction, rehabilitation and
other related costs for the Werner
Avenue Slope Stabilization project,
including a new retaining wall,
roadway improvements and installation
of storm sewer and catch basins for
erosion prevention in Bridgeville
Borough
Project Allocation 700,000
(F) Construction, infrastructure and
20210SB0915PN1157 - 203 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
other related costs for detention pond
construction to alleviate flooding in
the Broughton area of South Park
Township
Project Allocation 900,000
(G) Construction, infrastructure,
rehabilitation and other related costs
for a flood mitigation project in
Oakdale Borough
Project Allocation 1,000,000
(H) Construction, infrastructure,
rehabilitation and other related costs
for Phase I of the McLaughlin Run
Flood Control project, including
construction of a levee with pumps
along Carol Avenue and replacement of
the Commercial Street culverts in
Bridgeville Borough
Project Allocation 5,600,000
(ii) Bucks County
(A) Core Creek Dam flood control -
rehabilitation
Project Allocation 1,700,000
(B) Acquisition, rehabilitation,
infrastructure, flood mitigation and
related costs for a riverfront
redevelopment project
Project Allocation 10,000,000
(iii) Crawford County
(A) Rainbow Dam flood control -
20210SB0915PN1157 - 204 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
rehabilitation
Project Allocation 900,000
(iv) Luzerne County
(A) Construction, infrastructure,
rehabilitation and other related costs
for the West Pittston flood mitigation
levee project
Project Allocation 15,000,000
(v) Lycoming County
(A) Construction, infrastructure and
other related costs for the Lawshee
Run culvert replacement project in
Jersey Shore Borough
Project Allocation 15,000,000
(vi) Montgomery County
(A) Construction, infrastructure and
other related costs for a storm water
arch rehabilitation project located
under 1200 High Street in the Borough
of Pottstown
Project Allocation 750,000
(B) Construction, infrastructure and
other related costs for a storm water
arch rehabilitation project in the
Borough of Pottstown
Project Allocation 3,750,000
(vii) Pike County
(A) Kintz Creek Dam flood control -
rehabilitation
Project Allocation 2,300,000
20210SB0915PN1157 - 205 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(viii) Tioga County
(A) Hamilton Dam flood control -
rehabilitation
Project Allocation 1,800,000
(ix) Washington County
(A) Construction, infrastructure and
other related costs for a storm water
management and backflow prevention
project in West Brownsville Borough
Project Allocation 500,000
(B) Construction, infrastructure,
rehabilitation and other related costs
for a two-stage flood plain
restoration project located along
Tributary 1 of Catfish Creek upstream
of SR 18 in the City of Washington,
including realignment of the stream,
recreation of historical floodplain,
stabilization of existing incised
banks and natural plan stabilization
Project Allocation 700,000
(x) York County
(A) Acquisition, demolition, site
preparation, environmental
remediation, infrastructure,
construction and other related costs
for rehabilitation of Silver Lake
Project Allocation 2,000,000
Section 8. Itemization of Pennsylvania Fish and Boat Commission
capital projects.
20210SB0915PN1157 - 206 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Capital projects in the category of public improvement
projects to be acquired or developed by the Pennsylvania Fish
and Boat Commission and to be financed by the incurring of debt
or by the current revenues of the Fish Fund and the Boat Fund
pursuant to executive authorizations are hereby itemized,
together with their respective estimated costs, as follows:
Project
Total Project
Allocation
(1) Pennsylvania Fish and Boat Commission
(i) Cambria County
(A) Design, permit, acquire properties,
construct a rehabilitated dam,
including repair and replacement of
amenities, appurtenances and ADA
accessibility, or remove a hazardous
dam to meet current dam safety
requirements at Duman Lake
Project Allocation
4,715,000
(ii) Carbon County
(A) Design, permit, acquire properties,
construct a rehabilitated dam,
including repair and replacement of
amenities, appurtenances and ADA
accessibility, or remove a hazardous
dam to meet current dam safety
requirements at Mauch Chunk Lake
Project Allocation
7,075,000
(iii) Centre County
(A) Design, permit, construct,
rehabilitate or improve fish rearing
20210SB0915PN1157 - 207 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
facilities, buildings, effluent
treatment and related infrastructure
at Bellefonte State Fish Hatchery
Project Allocation
8,385,000
(B) Design, permit, construct,
rehabilitate or improve fish rearing
facilities, buildings, effluent
treatment and related infrastructure
at Pleasant Gap State Fish Hatchery
Project Allocation
5,235,000
(C) Design, permit, construct,
rehabilitate or improve fish rearing
facilities, buildings, effluent
treatment and related infrastructure
at Benner Spring State Fish Hatchery
Project Allocation
9,125,000
(iv) Clinton County
(A) Design, permit, construct,
rehabilitate or improve fish rearing
facilities, buildings, effluent
treatment and related infrastructure
at Tylersville State Fish Hatchery
Project Allocation
3,155,000
(v) Columbia County
(A) Design, permit, acquire properties,
construct a rehabilitated dam,
including repair and replacement of
amenities, appurtenances and ADA
accessibility, or remove a hazardous
dam to meet current dam safety
20210SB0915PN1157 - 208 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
requirements at Briar Creek Lake
Project Allocation
7,765,000
(vi) Crawford County
(A) Design, permit, construct,
rehabilitate or improve fish rearing
facilities, buildings, effluent
treatment and related infrastructure
at Linesville State Fish Hatchery
Project Allocation
14,365,000
(vii) Erie County
(A) Design, permit, acquire properties,
construct a rehabilitated dam,
including repair and replacement of
amenities, appurtenances and ADA
accessibility, or remove a hazardous
dam to meet current dam safety
requirements at Hatchery Pond
Project Allocation
1,045,000
(B) Design, permit, construct,
rehabilitate or improve fish rearing
facilities, buildings, effluent
treatment and related infrastructure
at Corry State Fish Hatchery
Project Allocation
9,125,000
(C) Design, permit, construct,
rehabilitate or improve fish rearing
facilities, buildings, effluent
treatment and related infrastructure
at Fairview State Fish Hatchery
Project Allocation
4,465,000
20210SB0915PN1157 - 209 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(D) Design, permit, construct,
rehabilitate or improve fish rearing
facilities, buildings, effluent
treatment and related infrastructure
at Union City State Fish Hatchery
Project Allocation
4,365,000
(viii) Forest County
(A) Design, permit, construct,
rehabilitate or improve fish rearing
facilities, buildings, effluent
treatment and related infrastructure
at Tionesta State Fish Hatchery
Project Allocation
5,185,000
(ix) Luzerne County
(A) Design, permit, acquire properties,
construct a rehabilitated dam,
including repair and replacement of
amenities, appurtenances and ADA
accessibility, or remove a hazardous
dam to meet current dam safety
requirements at Lilly Lake
Project Allocation
485,000
(x) Potter County
(A) Design, permit, construct,
rehabilitate or improve fish rearing
facilities, buildings, effluent
treatment and related infrastructure
at Oswayo State Fish Hatchery
Project Allocation
8,485,000
(xi) Susquehanna County
20210SB0915PN1157 - 210 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Design, permit, acquire properties,
construct a rehabilitated dam,
including repair and replacement of
amenities, appurtenances and ADA
accessibility, or remove a hazardous
dam to meet current dam safety
requirements at Stump Pond
Project Allocation
3,435,000
(xii) Warren County
(A) Design, permit, acquire properties,
construct a rehabilitated dam,
including repair and replacement of
amenities, appurtenances and ADA
accessibility, or remove a hazardous
dam to meet current dam safety
requirements at Browns Pond
Project Allocation
3,485,000
(xiii) Wayne County
(A) Design, permit, acquire properties,
construct a rehabilitated dam,
including repair and replacement of
amenities, appurtenances and ADA
accessibility, or remove a hazardous
dam to meet current dam safety
requirements at Douglas Pond
Project Allocation
3,715,000
(B) Design, permit, construct,
rehabilitate or improve fish rearing
facilities, buildings, effluent
treatment and related infrastructure
20210SB0915PN1157 - 211 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
at Pleasant Mount State Fish Hatchery
Project Allocation
7,035,000
(xiv) Wyoming County
(A) Design, permit, acquire properties,
construct a rehabilitated dam,
including repair and replacement of
amenities, appurtenances and ADA
accessibility, or remove a hazardous
dam to meet current dam safety
requirements at Lake Winola
Project Allocation
485,000
Section 9. Debt authorization.
(a) Public improvements.--The Governor, Auditor General and
State Treasurer are hereby authorized and directed to borrow
from time to time in addition to any authorization heretofore or
hereafter enacted, on the credit of the Commonwealth, subject to
the limitations provided in the current capital budget, money
not exceeding in the aggregate the sum specified in section
2(a).
(b) Furniture and equipment.--The Governor, Auditor General
and State Treasurer are hereby authorized and directed to borrow
from time to time in addition to any authorization heretofore or
hereafter enacted on the credit of the Commonwealth, subject to
the limitations provided in the current capital budget, money
not exceeding in the aggregate the sum specified in section 2(b)
as may be found necessary to carry out the acquisition and
construction of the public improvement projects consisting of
the acquisition of original movable furniture and equipment
specifically itemized in the capital budget.
(c) Transportation assistance.--The Governor, Auditor
20210SB0915PN1157 - 212 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
General and State Treasurer are hereby authorized and directed
to borrow from time to time in addition to any authorization
heretofore or hereafter enacted, on the credit of the
Commonwealth, subject to the limitations provided in the current
capital budget, money not exceeding in the aggregate the sum
specified in section 2(c) as may be found necessary to carry out
the acquisition and construction of the transportation
assistance projects specifically itemized in a capital budget.
(d) Redevelopment assistance.--Subject to the limitations in
section 317(b) of the act of February 9, 1999 (P.L.1, No.1),
known as the Capital Facilities Debt Enabling Act, the Governor,
Auditor General and State Treasurer are hereby authorized and
directed to borrow from time to time in addition to any
authorization heretofore or hereafter enacted on the credit of
the Commonwealth, subject to the limitations provided in the
current capital budget, money not exceeding in the aggregate the
sum specified in section 2(d) as may be found necessary to carry
out the redevelopment assistance capital projects specifically
itemized in the capital budget.
(e) Flood control.--The Governor, Auditor General and State
Treasurer are hereby authorized and directed to borrow from time
to time in addition to any authorization heretofore or hereafter
enacted, on the credit of the Commonwealth, subject to the
limitations provided in the current capital budget, money not
exceeding in the aggregate the sum specified in section 2(e) as
may be found necessary to carry out the acquisition and
construction of the flood control projects specifically itemized
in a capital budget.
(f) Pennsylvania Fish and Boat Commission projects.--The
Governor, Auditor General and State Treasurer are hereby
20210SB0915PN1157 - 213 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
authorized and directed to borrow from time to time in addition
to any authorization heretofore or hereafter enacted, on the
credit of the Commonwealth, subject to the limitations provided
in the current capital budget, money not exceeding in the
aggregate specified in section 2(f) to carry out the acquisition
and construction of the Pennsylvania Fish and Boat Commission
projects specifically itemized in a capital budget.
Section 10. Issue of bonds.
The indebtedness authorized in this act shall be incurred
from time to time and shall be evidenced by one or more series
of general obligation bonds of the Commonwealth in such
aggregate principal amount for each series as the Governor, the
Auditor General and the State Treasurer shall determine, but the
latest stated maturity date shall not exceed the estimated
useful life of the projects being financed as stated in section
10.
Section 11. Estimated useful life and term of debt.
(a) Estimated useful life.--The General Assembly states that
the estimated useful life of the capital projects itemized in
this act is as follows:
(1) Public improvement projects, 30 years.
(2) Furniture and equipment, 10 years.
(3) Transportation assistance projects:
(i) Rolling stock, 15 years.
(ii) Passenger buses, 12 years.
(iii) Furniture and equipment, 10 years.
(iv) All others, 30 years.
(4) Redevelopment assistance projects, 30 years.
(b) Term of debt.--The maximum term of the debt authorized
to be incurred under this act is 30 years.
20210SB0915PN1157 - 214 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Section 12. Appropriations.
(a) Public improvements.--The net proceeds of the sale of
the obligations authorized in this act are hereby appropriated
from the Capital Facilities Fund to the Department of General
Services in the maximum amount specified in section 2(a) to be
used by it exclusively to defray the financial cost of the
public improvement projects specifically itemized in a capital
budget. After reserving or paying the expenses of the sale of
the obligation, the State Treasurer shall pay to the Department
of General Services the money as required and certified by it to
be legally due and payable.
(b) Furniture and equipment.--The net proceeds of the sale
of the obligations authorized in this act are hereby
appropriated from the Capital Facilities Fund to the Department
of General Services in the maximum amount specified in section
2(b) to be used by it exclusively to defray the financial cost
of the public improvement projects consisting of the acquisition
of original movable furniture and equipment specifically
itemized in a capital budget. After reserving or paying the
expenses of the sale of the obligation, the State Treasurer
shall pay to the Department of General Services the money as
required and certified by it to be legally due and payable.
(c) Transportation assistance.--The net proceeds of the sale
of the obligations authorized in this act are hereby
appropriated from the Capital Facilities Fund to the Department
of Transportation in the maximum amount specified in section
2(c) to be used by it exclusively to defray the financial cost
of the transportation assistance projects specifically itemized
in a capital budget. After reserving or paying the expenses of
the sale of the obligation, the State Treasurer shall pay to the
20210SB0915PN1157 - 215 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Department of Transportation the money as required and certified
by it to be legally due and payable.
(d) Redevelopment assistance.--The net proceeds of the sale
of the obligations authorized in this act are hereby
appropriated from the Capital Facilities Fund to the Department
of Community and Economic Development in the maximum amount
specified in section 2(d) to be used by it exclusively to defray
the financial cost of the redevelopment assistance capital
projects specifically itemized in a capital budget. After
reserving or paying the expenses of the sale of the obligation,
the State Treasurer shall pay to the Department of Community and
Economic Development the money as required and certified by it
to be legally due and payable.
(e) Flood control.--The net proceeds of the sale of the
obligations authorized in this act are hereby appropriated from
the Capital Facilities Fund to the Department of Environmental
Protection in the maximum amount specified in section 2(e) to be
used by it exclusively to defray the financial cost of the flood
control projects specifically itemized in a capital budget.
After reserving or paying the expenses of the sale of the
obligation, the State Treasurer shall pay to the Department of
Environmental Protection the money as required and certified by
it to be legally due and payable.
Section 13. Federal funds.
(a) Projects itemized in this act.--All money received from
the Federal Government for the projects specifically itemized in
this act are also hereby appropriated for those projects.
(b) Projects not requiring itemization.--Department of
Military and Veterans Affairs construction projects which are
totally federally funded and to be administered by the
20210SB0915PN1157 - 216 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Department of General Services are hereby authorized.
Section 14. Editorial changes.
In editing and preparing this act for printing following the
final enactment, the Legislative Reference Bureau shall insert
or revise letters or numbers for projects where the letters or
numbers are missing or require revision. The Legislative
Reference Bureau shall also revise the total monetary amounts
for the total authorization, debt authorization, appropriations
and department totals as necessary to agree with the total
monetary amounts of the projects.
Section 15. Effective date.
This act shall take effect immediately.
20210SB0915PN1157 - 217 -