PRINTER'S NO. 295
THE GENERAL ASSEMBLY OF PENNSYLVANIA
SENATE BILL
No.
292
Session of
2021
INTRODUCED BY HUGHES, MARCH 2, 2021
REFERRED TO APPROPRIATIONS, MARCH 2, 2021
AN ACT
Providing for the capital budget for fiscal year 2021-2022;
itemizing public improvement projects, furniture and
equipment projects, redevelopment assistance projects and
flood control projects leased or assisted by the Department
of General Services and other State agencies, together with
their estimated financial costs; authorizing the incurring of
debt without the approval of the electors for the purpose of
financing the projects to be constructed, acquired or
assisted by the Department of General Services and other
State agencies; authorizing the use of current revenue for
the purpose of financing the projects to be constructed,
acquired or assisted by the Department of General Services
and other State agencies stating the estimated useful life of
the projects; and making appropriations.
The General Assembly of the Commonwealth of Pennsylvania
hereby enacts as follows:
Section 1. Short title.
This act shall be known and may be cited as the Capital
Budget Project Itemization Act of 2021-2022.
Section 2. Total authorizations.
(a) Public improvements.--The total authorization for the
additional capital projects in the category of public
improvement projects itemized in section 3 and to be acquired or
constructed by the Department of General Services, its
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
successors or assigns, and to be financed by the incurring of
debt shall be $6,017,946,595.
(b) Furniture and equipment.--The total authorization for
the additional capital projects in the category of public
improvement projects consisting of the acquisition of original
movable furniture and equipment to complete public improvement
projects itemized in section 4 and to be acquired by the
Department of General Services, its successors or assigns, and
to be financed by the incurring of debt shall be $276,739,190.
(c) Manufacturing Fund.--The total authorization for the
capital projects in the category of public improvement projects
itemized in section 5 to be acquired or developed by the
Department of Corrections and to be financed by current revenues
of the Manufacturing Fund pursuant to executive authorization
shall be $0.
(d) Redevelopment assistance.--The total authorization for
the capital projects in the category of redevelopment capital
projects itemized in section 6 for capital grants by the
Department of Community and Economic Development, its successors
or assigns and to be financed by the incurring of debt shall be
$0.
(e) Flood control.--The total authorization for the capital
projects in the category of flood control projects itemized in
section 7 and to be constructed by the Department of
Environmental Protection, its successors or assigns and to be
financed by the incurring of debt shall be $6,700,000.
Section 3. Itemization of public improvement capital projects.
Additional capital projects in the category of public
improvement projects to be acquired or constructed by the
Department of General Services, its successors or assigns, and
20210SB0292PN0295 - 2 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
to be financed by the incurring of debt, are hereby itemized,
together with their respective estimated financial costs, as
follows:
Project
Total Project
Allocation
(1) Department of Agriculture
(i) Farm Show Complex
(A) Renovation of the underground
(Cameron Street) pedestrian/cyclist
walk from Department of Agriculture to
the Farm Show Complex and associated
pathways
Project Allocation 3,000,000
(ii) Samuel E. Hayes Jr. Livestock Evaluation
Center
(A) Renovations to the Livestock
Evaluation Center
Project Allocation 2,000,000
(2) Department of Conservation and Natural
Resources
(i) Clear Creek Forest District
(A) New Maintenance Shop and equipment
storage
Project Allocation 4,000,000
(ii) Cornplanter Forest District
(A) Office renovation
Project Allocation 3,000,000
(iii) Delaware State Forest
(A) Lilly Pond Dam Spillway repair/
replacement
20210SB0292PN0295 - 3 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 1,350,000
(iv) Norristown Farm Park
(A) Replace multiple vehicular and
pedestrian bridges
Project Allocation 6,250,000
(v) Pinchot State Forest
(A) Remove Turtle Creek Dam
Project Allocation 1,875,000
(vi) Pinchot Forest District
(A) Remove Race Run Dam
Project Allocation 2,000,000
(B) Remove Dam 148-118 SGL 260
Project Allocation 2,000,000
(vii) Tiadaghton & Tioga Forest Districts
(A) Pine Creek Rail Trail-truss bridges
over Pine Creek
Project Allocation 6,700,000
(viii) Various State Parks - Statewide
(A) Campground facility amenities -
construct washhouses, including
utility and site work
Project Allocation 12,500,000
(ix) Bureau of Forestry
(A) New Regional Air Operations
facilities
Project Allocation 9,600,000
(B) New Fire Cache/Forestry warehouse -
replace main building
Project Allocation 7,200,000
(3) Department of Corrections
20210SB0292PN0295 - 4 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(i) Elizabethtown Training Facility
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 3,982,700
(ii) Quehanna Boot Camp
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 2,793,000
(iii) State Correctional Institution at
Albion
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 4,362,000
(iv) State Correctional Institution at Benner
(A) Design and construction of a
transportation hub, including land
development and site infrastructure
improvements
Project Allocation 3,000,000
(B) Design and construction of building
expansion, new construction,
20210SB0292PN0295 - 5 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 5,933,490
(v) State Correctional Institution at
Cambridge Springs
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 15,354,000
(vi) State Correctional Institution at Camp
Hill
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 37,425,000
(vii) State Correctional Institution at
Chester
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 6,848,000
(viii) State Correctional Institution at Coal
Township
20210SB0292PN0295 - 6 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 12,567,000
(ix) State Correctional Institution at Dallas
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 1,657,000
(x) State Correctional Institution at Fayette
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 15,679,200
(xi) State Correctional Institution at Forest
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 14,394,000
(xii) State Correctional Institution at
Frackville
(A) Design and construction of building
20210SB0292PN0295 - 7 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 6,397,900
(xiii) State Correctional Institution at
Graterford
(A) Design and construction of code,
permit, and
site/utility/infrastructure-related
issues
Project Allocation 650,000
(xiv) State Correctional Institution at
Greene
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 7,462,000
(xv) State Correctional Institution at
Houtzdale
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 11,897,500
(xvi) State Correctional Institution at
Huntingdon
20210SB0292PN0295 - 8 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 14,292,350
(xvii) State Correctional Institution at
Laurel Highlands
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 6,738,300
(xviii) State Correctional Institution at
Mahanoy
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 20,493,500
(xix) State Correctional Institution at
Mercer
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 7,908,500
20210SB0292PN0295 - 9 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(xx) State Correctional Institution at Muncy
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 14,342,980
(xxi) State Correctional Institution at Pine
Grove
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 8,596,000
(xxii) State Correctional Institution at
Retreat
(A) Design and construction of facility
upgrades, including land development
and site infrastructure improvements,
and new construction
Project Allocation 1,500,000
(xxiii) State Correctional Institution at
Rockview
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 10,131,000
20210SB0292PN0295 - 10 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(xxiv) State Correctional Institution at
Smithfield
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 8,375,270
(xxv) State Correctional Institution at
Somerset
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 8,403,610
(xxvi) State Correctional Institution at
Waymart
(A) Design and construction of building
expansion, new construction,
renovations and alterations, including
land development and site
infrastructure improvements
Project Allocation 19,787,295
(4) Department of Education
(i) Department of Education Headquarters
(Reserved)
(ii) Lincoln University
(A) Infrastructure replacement, upgrade
and improvements
20210SB0292PN0295 - 11 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 16,000,000
(B) Renovation of Houston Hall
Project Allocation 12,000,000
(iii) The Pennsylvania State University
(A) Davey Laboratory Renovation
(University Park Campus) design,
construction (new space or addition to
and/or renovation of existing space;
including demolition, abatement of
hazardous materials, extensions and/or
upgrading of utilities and other
infrastructure needs) and other
related costs for Davey Laboratory at
the University Park campus. The
project scope includes building
systems renewal, including mechanical,
electrical, plumbing and sprinkler
systems and code upgrades. Funding
will be used for both design and
construction costs, as well as
necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
20210SB0292PN0295 - 12 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
related codes.
Project Allocation 100,000,000
(B) Osmond Laboratory Renovation - Phase
II (University Park Campus) design,
construction (new space or addition to
and/or renovation of existing space;
including demolition, abatement of
hazardous materials, extensions and/or
upgrading of utilities and other
infrastructure needs) and other
related costs for Phase II of Osmond
Laboratory at the University Park
campus. This project will complete the
renovation of Osmond Laboratory. The
project will renew the remainder of
facility by replacing worn systems,
improving the thermal envelope,
replacing windows and interior
finishes. Interior space modifications
will be made to meet the needs of the
departments and activities currently
housed there and into the future.
Funding will be used for both design
and construction costs, as well as
necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
20210SB0292PN0295 - 13 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes.
Project Allocation 40,000,000
(C) Carpenter Building Renovation
(University Park Campus) design,
construction (new space or addition to
and/or renovation of existing space;
including demolition, abatement of
hazardous materials, extensions and/or
upgrading of utilities and other
infrastructure needs) and other
related costs for the Carpenter
Builder at the University Park campus.
Carpenter Building requires building
wide renewal to include building, life
safety system and accessibility
upgrades. The project includes
building systems and envelope
renewal/replacement. Funding will be
used for both design and construction
costs, as well as necessary utility
upgrades and extensions, site
improvements and code-related
upgrades. All costs for both occupant
and program relocation or interim
facilities will be included. The
construction will both meet all
20210SB0292PN0295 - 14 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
current building code requirements and
provide for barrier-free access as
required by the Americans with
Disabilities Act and related codes.
Project Allocation 35,000,000
(D) Student Support and Services Center
(University Park Campus) design,
construction (new space or addition to
and/or renovation of existing space;
including demolition, abatement of
hazardous materials, extensions and/or
upgrading of utilities and other
infrastructure needs) and other
related costs for a Student Support
and Services Center at the University
Park campus. A new multistory building
will be constructed to provide
functional spaces for student support
and engagement, admissions and
administration. Funding will be used
for both design and construction
costs, as well as necessary utility
upgrades and extensions, site
improvements and code-related
upgrades. All costs for both occupant
and program relocation or interim
facilities will be included. The
construction will both meet all
current building code requirements and
provide for barrier-free access as
20210SB0292PN0295 - 15 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
required by the Americans with
Disabilities Act and related codes.
Project Allocation 90,000,000
(E) Electrical Engineering West
Renovation (University Park Campus)
design, construction (new space or
addition to and/or renovation of
existing space; including demolition,
abatement of hazardous materials,
extensions and/or upgrading of
utilities and other infrastructure
needs) and other related costs for
Electrical Engineering West at the
University Park campus. This project
addresses the continuing needs of the
College of Engineering. The project
scope includes building-wide systems
renewal, including mechanical,
electrical, plumbing and sprinkler
systems to improve efficiency and
performance. The building exterior
improvements include masonry repair,
roof and window replacement. Funding
will be used for both design and
construction costs, as well as
necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
20210SB0292PN0295 - 16 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes.
Project Allocation 65,000,000
(F) Electrical Engineering East
Renovation (University Park Campus)
design, construction (new space or
addition to and/or renovation of
existing space; including demolition,
abatement of hazardous materials,
extensions and/or upgrading of
utilities and other infrastructure
needs) and other related costs for
Electrical Engineering East at the
University Park campus. This project
addresses the continuing needs of the
College of Engineering. The project
scope includes building systems
renewal, including mechanical,
electrical, plumbing and fire
suppression systems to improve
efficiency and performance. The
building exterior improvements include
glazing, curtain wall and door
replacement. Interior and
accessibility improvements are needed.
Funding will be used for both design
20210SB0292PN0295 - 17 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
and construction costs, as well as
necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes.
Project Allocation 45,000,000
(G) Pattee Library/Paterno Library
Renovation (University Park Campus)
design, construction (new space or
addition to and/or renovation of
existing space; including demolition,
abatement of hazardous materials,
extensions and/or upgrading of
utilities and other infrastructure
needs) and other related costs for
Pattee Library/Paterno Library at the
University Park campus. This project
will address aging systems,
accessibility concerns, reliability
issues and safety concerns. Funding
will be used for both design and
construction costs, as well as
necessary utility upgrades and
20210SB0292PN0295 - 18 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes.
Project Allocation 60,000,000
(H) Sparks Building Renovation
(University Park Campus) design,
construction (new space or addition to
and/or renovation of existing space;
including demolition, abatement of
hazardous materials, extensions and/or
upgrading of utilities and other
infrastructure needs) and other
related costs for the Sparks Building
at the University Park campus. The
project will include building system
and envelope renewal and renovation to
address programmatic and system needs.
Funding will be used for both design
and construction costs, as well as
necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
20210SB0292PN0295 - 19 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
or interim facilities will be
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes.
Project Allocation 65,000,000
(I) Applied Research Laboratory
Renovation (University Park Campus)
design, construction (new space or
addition to and/or renovation of
existing space; including demolition,
abatement of hazardous materials,
extensions and/or upgrading of
utilities and other infrastructure
needs) and other related costs for the
Applied Research Laboratory at the
University Park campus. The ARL
Building requires building wide
renewal to include building systems
and envelope renewal/replacement. The
project scope also includes life
safety system and accessibility
upgrades. Funding will be used for
both design and construction costs, as
well as necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
20210SB0292PN0295 - 20 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
or interim facilities will be
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes.
Project Allocation 50,000,000
(J) Capital Renewal, Phase X (University
Park Campus) design, construction (new
space or addition to and/or renovation
of existing space; including
demolition, abatement of hazardous
materials, extensions and/or upgrading
of utilities and other infrastructure
needs) and other related costs for
Capital Renewal, Phase X at the
University Park campus. This project
will allow the University to replace,
install or upgrade as appropriate
systems in major academic, research
and administrative buildings across
campus that were not addressed in the
other phases of renewal. Funding will
be used for both design and
construction costs, as well as
necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
20210SB0292PN0295 - 21 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
or interim facilities will be
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes.
Project Allocation 40,000,000
(K) Chilled Water Plant (University Park
Campus) design, construction (new
space or addition to and/or renovation
of existing space; including
demolition, abatement of hazardous
materials, extensions and/or upgrading
of utilities and other infrastructure
needs) and other related costs for a
Chilled Water Plant at the University
Park campus. Scope includes new
building construction along with the
initial chilled water, condenser
water, and electrical equipment and
plant infrastructure. Funding will be
used for both design and construction
costs, as well as necessary utility
upgrades and extensions, site
improvements and code-related
upgrades. All costs for both occupant
and program relocation or interim
facilities will be included. The
construction will both meet all
20210SB0292PN0295 - 22 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
current building code requirements and
provide for barrier-free access as
required by the Americans with
Disabilities Act and related codes.
Project Allocation 40,000,000
(L) Advanced Water Treatment System
(University Park Campus) design,
construction (new space or addition to
and/or renovation of existing space;
including demolition, abatement of
hazardous materials, extensions and/or
upgrading of utilities and other
infrastructure needs) and other
related costs for an Advanced Water
Treatment System at the University
Park campus. Funding will be used for
both design and construction costs, as
well as necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes.
Project Allocation 15,000,000
(M) Classroom-Library Building Renovation
20210SB0292PN0295 - 23 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(and Nursing Addition) (Scranton
Campus) design, construction (new
space or addition to and/or renovation
of existing space; including
demolition, abatement of hazardous
materials, extensions and/or upgrading
of utilities and other infrastructure
needs) and other related costs for the
Classroom-Library Building Renovation
(and Nursing Addition) at the Scranton
campus. A total renovation is needed
to address a multitude of
deficiencies. An addition for the
expansion of the Nursing program is
planned. Funding will be used for both
design and construction costs, as well
as necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes.
Project Allocation 20,000,000
(N) Kelly Library Renovation and Addition
(Greater Allegheny Campus) design,
20210SB0292PN0295 - 24 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
construction (new space or addition to
and/or renovation of existing space;
including demolition, abatement of
hazardous materials, extensions and/or
upgrading of utilities and other
infrastructure needs) and other
related costs for the Kelly Library
Renovation and Addition at the Greater
Allegheny campus. A total renovation
is needed to address a multitude of
deficiencies. An addition for an
auditorium is planned. Funding will be
used for both design and construction
costs, as well as necessary utility
upgrades and extensions, site
improvements and code-related
upgrades. All costs for both occupant
and program relocation or interim
facilities will be included. The
construction will both meet all
current building code requirements and
provide for barrier-free access as
required by the Americans with
Disabilities Act and related codes.
Project Allocation 20,000,000
(O) Classroom/Class Lab Teaching and
Learning Building (Harrisburg Campus)
Design, construction (new space or
addition to and/or renovation of
existing space; including demolition,
20210SB0292PN0295 - 25 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
abatement of hazardous materials,
extensions and/or upgrading of
utilities and other infrastructure
needs) and other related costs for a
Classroom/Class Lab Teaching and
Learning Building at the Harrisburg
campus. A new multistory
Classroom/Class Lab Building will be
constructed to provide modern
classrooms, instructional
laboratories, faculty offices,
instructional support and
flexible/adaptable space to support
both general and technology
instructional programs, as well as
campus engagement activities. Funding
will be used for both design and
construction costs, as well as
necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes.
Project Allocation 50,000,000
20210SB0292PN0295 - 26 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(P) Teaching and Administrative Support
Building (Hershey Campus) design,
construction (new space or addition to
and/or renovation of existing space;
including demolition, abatement of
hazardous materials, extensions and/or
upgrading of utilities and other
infrastructure needs) and other
related costs for a Teaching and
Administrative Support Building at the
Hershey campus. This project will
provide space for key administrative
units on campus. The program will
include new administrative and support
spaces, offices and meeting rooms. The
facility will be equipped with state-
of-the-art technology. The facility
will be located on the core campus
adjacent to clinical, administrative,
research and academic facilities
easily accessible by students, faculty
and visitors. Funding will be used for
both design and construction costs, as
well as necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
meet all current building code
20210SB0292PN0295 - 27 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes.
Project Allocation 80,000,000
(Q) Capital Renewal (Hershey Campus)
design, construction (new space or
addition to and/or renovation of
existing space; including demolition,
abatement of hazardous materials,
extensions and/or upgrading of
utilities and other infrastructure
needs) and other related costs for
Capital Renewal at the Hershey campus.
This project is part of a continuing
effort to make significant
comprehensive upgrades to
infrastructure in the College of
Medicine buildings at the Hershey
Campus. This project will allow the
University to replace, install or
upgrade as appropriate systems in
major academic, research and
administrative buildings across campus
that were not addressed in routine
renewal programs. Funding will be used
for both design and construction
costs, as well as necessary utility
upgrades and extensions, site
improvements and code-related
20210SB0292PN0295 - 28 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
upgrades. All costs for both occupant
and program relocation or interim
facilities will be included. The
construction will both meet all
current building code requirements and
provide for barrier-free access as
required by the Americans with
Disabilities Act and related codes.
Project Allocation 30,000,000
(R) Academic and Research Building
(Hershey Campus) design, construction
(new space or addition to and/or
renovation of existing space;
including demolition, abatement of
hazardous materials, extensions and/or
upgrading of utilities and other
infrastructure needs) and other
related costs for an Academic and
Research Building at the Hershey
campus. This project will include new
wet and dry research laboratories,
comparative medicine spaces, support
spaces, instructional spaces, seminar
rooms, offices and administration
space. The facility will be equipped
with state-of-the-art instructional
technology. The facility will be
located on the core campus adjacent to
academic, clinical and other research
facilities easily accessible by
20210SB0292PN0295 - 29 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
students, faculty and visitors.
Funding will be used for both design
and construction costs, as well as
necessary utility upgrades and
extensions, site improvements and
code-related upgrades. All costs for
both occupant and program relocation
or interim facilities will be
included. The construction will both
meet all current building code
requirements and provide for barrier-
free access as required by the
Americans with Disabilities Act and
related codes.
Project Allocation 160,000,000
(iv) Temple University
(A) Design, infrastructure, abatement of
hazardous materials and construction
of an academic/administrative
building, including utility upgrades
and extensions, site improvements and
code-related upgrades, including ADA
compliance-related upgrades, at the
main campus of Temple University.
Project Allocation 250,000,000
(B) New classroom building, addition,
renovation - design, infrastructure,
abatement of hazardous materials and
construction of a classroom building
academic complex. This will involve
20210SB0292PN0295 - 30 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
renovating and addition to an existing
building or build a stand alone
classroom building.
Project Allocation 125,000,000
(C) New Science, Technology, Engineering
and Mathematics (STEM) academic
building, addition, renovation -
design, infrastructure, abatement of
hazardous materials and construction
of a STEM academic complex. This will
involve renovating and addition to an
existing building or build a stand-
alone building.
Project Allocation 125,000,000
(D) Design, infrastructure, abatement of
hazardous materials, renovation and
construction of expansion to Ritter
Hall, including utility upgrades and
extensions, site improvements, code-
related upgrades, including ADA
compliance-related upgrades.
Project Allocation 40,000,000
(v) Thaddeus Stevens College of Technology
(A) Hartzell renovations
Project Allocation 4,000,000
(B) Jones renovations
Project Allocation 5,000,000
(C) Mellor renovations
Project Allocation 20,000,000
(D) Dorm renovations
20210SB0292PN0295 - 31 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 5,000,000
(E) Shop addition
Project Allocation 5,000,000
(F) Student Center addition
Project Allocation 5,000,000
(G) Campus improvements to meet current
and future demands, including, but not
limited to, land acquisition, site and
building infrastructure improvements,
new construction, renovations and
building system upgrades and
improvements
Project Allocation 18,000,000
(H) Branch Campus improvements to meet
current and future demands, including,
but not limited to, land acquisition,
site and building infrastructure
improvements, new construction,
renovations and building system
upgrades and improvements
Project Allocation 8,000,000
(vi) University of Pittsburgh
(A) New Integrated Health Sciences
Building, Oakland Campus
Project Allocation 200,000,000
(B) New Academic Student Support Center
Building, Oakland Campus
Project Allocation 80,000,000
(C) New One Bigelow Academic Teaching and
Research Complex, Oakland Campus
20210SB0292PN0295 - 32 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 300,000,000
(D) Posvar Hall addition and renovation,
Oakland Campus
Project Allocation 100,000,000
(E) Posvar Hall Chiller Plant expansion
and upgrade, Oakland Campus
Project Allocation 50,000,000
(F) Programmatic and infrastructure
upgrades to buildings, Oakland Campus
Project Allocation 50,000,000
(G) Crabtree Hall renovations, Oakland
Campus
Project Allocation 110,000,000
(5) Pennsylvania Emergency Management Agency
(Reserved)
(6) Department of Environmental Protection
(i) Carbon County
(A) Quakake Treatment Facility additional
funds for construction of acid mine
treatment facility
Project Allocation 6,000,000
(ii) Clarion County
(A) Mill Creek Treatment Facility
construction of treatment facility
Project Allocation 14,000,000
(iii) Clearfield County
(A) Addition funds for additional culvert
alignment under borough streets at
Stinky Run
Project Allocation 1,000,000
20210SB0292PN0295 - 33 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(iv) Fayette County
(A) Phillips Discharge Treatment Facility
construction of treatment facility
Project Allocation 12,000,000
(v) Jefferson County
(A) Weisner Hollow additional funds to
decertify high hazard dam and
construct permanent drainage
channel. Regrade and revegetate site
Project Allocation 6,500,000
(vi) Lycoming County
(A) Grafius Run and Freedom Road
Tributary - improve existing culverts
in the City of Williamsport
Project Allocation 3,500,000
(vii) Westmoreland County
(A) West Newton Coal Logistics Slope
embankment stabilization and coal
refuse slurry impoundment capping
Project Allocation 23,000,000
(7) Department of General Services
(i) Berks County
(A) Renovations, alterations, new
construction, site improvements,
infrastructure upgrades and land
acquisition for DGS-owned buildings in
the Reading area
Project Allocation 15,000,000
(ii) Dauphin County
(A) Renovations, alterations, new
20210SB0292PN0295 - 34 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
construction, site improvements,
infrastructure upgrades and land
acquisition for DGS-owned buildings in
the Harrisburg area
Project Allocation 200,000,000
(B) Upgrade and expansion of IT
infrastructure and automation system
redundancy
Project Allocation 100,000,000
(C) Renovations and alterations for
upgrades and infrastructure
improvements to the Finance Building
Project Allocation 100,000,000
(iii) Lackawanna County
(A) Renovations, alterations, new
construction, site improvements,
infrastructure upgrades and land
acquisition for DGS-owned buildings in
Scranton
Project Allocation 15,000,000
(iv) Statewide
(A) Professional services for the
development of agency facility
strategic master plans and capital
planning
Project Allocation 15,000,000
(8) Department of Human Services
(i) Clarks Summit State Hospital
(A) Renovate the institution, including
new construction, alterations,
20210SB0292PN0295 - 35 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
renovations, site improvements and
infrastructure upgrades, and land
acquisition
Project Allocation 9,000,000
(ii) Danville State Hospital
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades, and land
acquisition
Project Allocation 9,000,000
(iii) Ebensburg Center
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades, and land
acquisition
Project Allocation 9,000,000
(iv) Loysville Youth Development Center
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements, and
infrastructure upgrades, and land
acquisition
Project Allocation 9,000,000
(v) Norristown State Hospital
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades, and land
20210SB0292PN0295 - 36 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
acquisition
Project Allocation 9,000,000
(vi) North Central Secure Treatment Unit
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades, and land
acquisition
Project Allocation 7,000,000
(vii) Selinsgrove Center
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades, and land
acquisition
Project Allocation 9,000,000
(viii) South Mountain Secure Treatment Unit
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades, and land
acquisition
Project Allocation 5,000,000
(ix) South Mountain Restoration Center
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades, and land
acquisition
Project Allocation 9,000,000
20210SB0292PN0295 - 37 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(x) Torrance State Hospital
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades, and land
acquisition
Project Allocation 9,000,000
(xi) Warren State Hospital
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades, and land
acquisition
Project Allocation 9,000,000
(xii) Wernersville State Hospital
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades, and land
acquisition
Project Allocation 9,000,000
(xiii) Youth Forestry Camp No.2
(A) Renovate the institution, including
new construction, alterations,
renovations, site improvements and
infrastructure upgrades, and land
acquisition
Project Allocation 9,000,000
(xiv) Youth Forestry Camp No.3
(A) Renovate the institution, including
20210SB0292PN0295 - 38 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
new construction, alterations,
renovations, site improvements and
infrastructure upgrades, and land
acquisition
Project Allocation 5,000,000
(9) Pennsylvania Historical and Museum
Commission
(i) State Museum
(A) Exhibit upgrades
Project Allocation 20,000,000
(ii) Brandywine Battlefield Park
(A) Building, site and infrastructure
improvements
Project Allocation 5,000,000
(iii) Daniel Boone Homestead
(A) Building, site and infrastructure
improvements
Project Allocation 5,000,000
(iv) Drake Well
(A) Building, site and infrastructure
improvements
Project Allocation 3,000,000
(v) Erie Maritime Museum
(A) Building, site and infrastructure
improvements
Project Allocation 2,000,000
(vi) Graeme Park
(A) Building, site and infrastructure
improvements
Project Allocation 3,500,000
20210SB0292PN0295 - 39 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(B) Exhibit upgrades
Project Allocation 1,000,000
(vii) Railroad Museum of Pennsylvania
(A) Building, infrastructure and site
improvements
Project Allocation 3,000,000
(10) Department of Military and Veterans Affairs
(i) Delaware Valley Veterans Home
(A) Construct new adult day health care
and 48-bed nursing care addition with
additional parking area
Project Allocation 20,000,000
(B) Rehabilitate Veterans' Home
Project Allocation 10,000,000
(ii) Gino J. Merli Veterans Center
(A) Construct new adult day health care
addition with parking area, including
demolition as required
Project Allocation 13,500,000
(B) Rehabilitate Veterans' Home
Project Allocation 10,000,000
(iii) Hollidaysburg Veterans Home
(A) Construct new adult day health care
addition with additional parking area
Project Allocation 8,040,000
(B) Rehabilitate Veterans' Home
Project Allocation 10,000,000
(iv) Pennsylvania Soldiers' & Sailors' Home,
Erie
(A) Construct new adult day health care
20210SB0292PN0295 - 40 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
addition with additional parking area
Project Allocation 10,720,000
(B) Rehabilitate Veterans' Home
Project Allocation 10,000,000
(v) Southeastern Veterans' Center, Spring
City
(A) Rehabilitate Veterans' Home
Project Allocation 10,000,000
(vi) Southwestern Veterans' Center,
Pittsburgh
(A) Construct new adult day health care
addition with additional parking area
Project Allocation 14,740,000
(B) Rehabilitate Veterans' Home
Project Allocation 10,000,000
(vii) Statewide Veterans' Homes
(A) Provide safety measures and physical
security upgrades, including new
construction, renovations, electronic
security systems and equipment, and
site work
Project Allocation 30,000,000
(B) Provide additional funding to
rehabilitate PA Veterans' Homes,
including to remedy life safety and
regulatory deficiencies
Project Allocation 30,000,000
(viii) Allentown Readiness Center
(A) Renovate the Readiness Center,
including demolition, new
20210SB0292PN0295 - 41 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 10,000,000
(ix) Beaver Falls
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 10,000,000
(x) Berks County Readiness Centers
(A) Renovate DMVA facilities in Berks
County, including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 20,000,000
(xi) Cambridge Springs Readiness Center
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 12,500,000
(xii) Carlisle Readiness Center
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
20210SB0292PN0295 - 42 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
security system upgrades
Project Allocation 12,500,000
(xiii) Chambersburg Readiness Center
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 10,000,000
(xiv) Coatesville Readiness Center
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 10,000,000
(xv) Easton Readiness Center
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 10,000,000
(xvi) Everett Readiness Center
(A) Renovate the Readiness Center,
including demolition, new
construction, correcting structure and
infrastructure deficiencies and
security system upgrades
Project Allocation 10,000,000
20210SB0292PN0295 - 43 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(xvii) Fort Indiantown Gap DMVA facilities
and infrastructure
(A) Renovate the Readiness Center,
including new construction, correcting
structure and infrastructure
deficiencies and security system
upgrades
Project Allocation 37,500,000
(xviii) Greensburg Readiness Center
(A) Renovate the Readiness Center,
including new construction, correcting
structure and infrastructure
deficiencies and security system
upgrades
Project Allocation 10,000,000
(xix) Huntingdon Readiness Center
(A) Renovate the Readiness Center,
including new construction, correcting
structure and infrastructure
deficiencies and security system
upgrades
Project Allocation 10,000,000
(xx) Lebanon Readiness Center
(A) Renovate the Readiness Center,
including new construction, correcting
structure and infrastructure
deficiencies and security system
upgrades
Project Allocation 12,500,000
(xxi) Lewisburg Readiness Center
20210SB0292PN0295 - 44 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Renovate the Readiness Center,
including new construction, correcting
structure and infrastructure
deficiencies and security system
upgrades
Project Allocation 12,500,000
(xxii) Lewistown Readiness Center
(A) Renovate the Readiness Center,
including new construction, correcting
structure and infrastructure
deficiencies and security system
upgrades
Project Allocation 12,500,000
(xxiii) Luzerne County Readiness Centers
(A) Renovate DMVA facilities in Luzerne
County, including demolition, new
construction, correcting structure and
infrastructure deficiencies, and
security system upgrades
Project Allocation 25,000,000
(xxiv) Philadelphia/Delaware Counties
(A) Renovate the facility, including
demolition, new construction,
correcting structure and
infrastructure deficiencies, and
security system upgrades for Readiness
Center
Project Allocation 20,000,000
(xxv) Punxsutawney Readiness Center
(A) Renovate the Readiness Center,
20210SB0292PN0295 - 45 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
including new construction, correcting
structure and infrastructure
deficiencies and security system
upgrades
Project Allocation 7,500,000
(xxvi) South Mountain Readiness Center
(A) Renovate the Readiness Center,
including new construction, correcting
structure and infrastructure
deficiencies and security system
upgrades
Project Allocation 7,500,000
(xxvii) Tamaqua Readiness Center
(A) Renovate the Readiness Center,
including new construction, correcting
structure and infrastructure
deficiencies and security system
upgrades
Project Allocation 15,000,000
(xxviii) Wellsboro Readiness Center
(A) Renovate the Readiness Center,
including new construction, correcting
structure and infrastructure
deficiencies and security system
upgrades
Project Allocation 10,000,000
(xxix) New Readiness Center
(A) Land and/or building acquisition for
new readiness center to relocate
existing center in Dauphin and/or
20210SB0292PN0295 - 46 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Lebanon counties
Project Allocation 20,000,000
(B) Acquisition of land and or facilities
to build or renovate buildings for a
new readiness center in Southeastern
Pennsylvania
Project Allocation 33,000,000
(xxx) Horsham Air Guard Station
(A) Acquisition of land to construct new
gate
Project Allocation 8,000,000
(11) Office of Administration
(i) Commonwealth Technology Center (Reserved)
(12) Pennsylvania State Police
(i) Statewide
(A) Capital renewal of existing
facilities, including site and
building envelop improvements,
interior renovations, building system
upgrades and code-required
improvements
Project Allocation 25,000,000
(B) Land acquisition or purchase of
existing facility to replace existing
troop headquarter buildings or provide
new facilities
Project Allocation 29,000,000
(13) State System of Higher Education
(i) Bloomsburg University
(A) Acquisition or construction of
20210SB0292PN0295 - 47 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
student housing
Project Allocation 98,000,000
(B) Provide for deferred maintenance
needs and capital renewal repairs,
additional funds
Project Allocation 25,000,000
(ii) California University
(A) Acquisition or construction of
student housing, additional funds
Project Allocation 33,000,000
(B) Provide for deferred maintenance
needs and capital renewal repairs,
additional funds
Project Allocation 20,000,000
(iii) Cheyney University
(A) Provide for deferred maintenance
needs and capital renewal repairs,
additional funds
Project Allocation 20,000,000
(iv) Clarion University
(A) Provide for deferred maintenance
needs and capital renewal repairs,
additional funds
Project Allocation 20,000,000
(v) East Stroudsburg University
(A) Provide for deferred maintenance
needs and capital renewal repairs,
additional funds
Project Allocation 20,000,000
(vi) Edinboro University
20210SB0292PN0295 - 48 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Hamilton Hall renovation
Project Allocation 25,000,000
(B) Demolition of underutilized and
obsolete buildings
Project Allocation 15,000,000
(C) Provide for deferred maintenance
needs and capital renewal repairs,
additional funds
Project Allocation 20,000,000
(vii) Indiana University
(A) Upgrade of campus utilities
infrastructure
Project Allocation 40,000,000
(B) Demolition of underutilized and
obsolete buildings, additional funds
Project Allocation 15,000,000
(C) Provide for deferred maintenance
needs and capital renewal repairs,
additional funds
Project Allocation 35,000,000
(viii) Kutztown University
(A) Provide for deferred maintenance
needs and capital renewal repairs,
additional funds
Project Allocation 20,000,000
(B) Beeky Education Building renovation
Project Allocation 19,000,000
(ix) Lock Haven University
(A) Acquisition or construction of
student housing, additional funds
20210SB0292PN0295 - 49 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 20,000,000
(B) Provide for deferred maintenance
needs and capital renewal repairs,
additional funds
Project Allocation 20,000,000
(x) Mansfield University
(A) Provide for deferred maintenance
needs and capital renewal repairs,
additional funds
Project Allocation 20,000,000
(B) Renovation, replacement or upgrade of
campus utilities infrastructure,
additional funds
Project Allocation 5,000,000
(xi) Millersville University
(A) Renovation, replacement or upgrade of
campus utilities infrastructure,
additional funds
Project Allocation 21,000,000
(B) Stadium renovation
Project Allocation 15,000,000
(xii) Shippensburg University
(A) Heiges Field House renovation and
addition
Project Allocation 40,000,000
(B) Old Main renovation
Project Allocation 15,000,000
(C) Provide for deferred maintenance
needs and capital renewal repairs,
additional funds
20210SB0292PN0295 - 50 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 20,000,000
(xiii) Slippery Rock University
(A) Additional funds for McKay Building
renovation/addition
Project Allocation 15,000,000
(B) Provide for deferred maintenance
needs and capital renewal repairs,
additional funds
Project Allocation 29,000,000
(xiv) West Chester University
(A) Provide for deferred maintenance
needs and capital renewal repairs,
additional funds
Project Allocation 32,000,000
(14) Department of Transportation
(i) Adams County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(ii) Allegheny County
(A) Renovation and expansion for code
compliance, upgraded building systems
20210SB0292PN0295 - 51 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
improved program requirements and
energy efficiency at District Office
11-0
Project Allocation 10,000,000
(B) Renovation and expansion for code
compliance, upgraded building systems
improved program requirements and
energy efficiency at the Western
Training Facility
Project Allocation 5,000,000
(C) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(D) Provide for the construction or
renovation of maintenance facility at
Fort Pitt Tunnel, including site
acquisition and development, design
and construction of buildings, systems
and utility work
Project Allocation 7,000,000
(E) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 11
Project Allocation 5,000,000
20210SB0292PN0295 - 52 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(F) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 12
Project Allocation 5,000,000
(G) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(iii) Armstrong County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(iv) Beaver County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
20210SB0292PN0295 - 53 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(v) Bedford County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(vi) Berks County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
20210SB0292PN0295 - 54 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(vii) Blair County
(A) Renovation and expansion for code
compliance, upgraded building systems,
improved program requirements and
energy efficiency at District Office
9-0
Project Allocation 10,000,000
(B) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(C) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(viii) Bradford County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
20210SB0292PN0295 - 55 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(ix) Bucks County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Welcome
Center - Site P
Project Allocation 5,000,000
(C) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(x) Butler County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
20210SB0292PN0295 - 56 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 5,000,000
(xi) Cambria County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xii) Cameron County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xiii) Carbon County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
20210SB0292PN0295 - 57 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xiv) Centre County
(A) Provide for the construction or
renovation of Bellefonte Maintenance
facility, including site acquisition
and development, design and
construction of buildings, systems and
utility work
Project Allocation 7,000,000
(B) Provide for the construction or
renovation of Phillipsburg Maintenance
facility, including site acquisition
and development, design and
construction of buildings, systems and
utility work
Project Allocation 7,000,000
(C) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 29
Project Allocation 5,000,000
(D) Renovation, expansion or replacement,
20210SB0292PN0295 - 58 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 30
Project Allocation 5,000,000
(E) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xv) Chester County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xvi) Clarion County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
20210SB0292PN0295 - 59 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xvii) Clearfield County
(A) Renovation and expansion for code
compliance, upgraded building systems,
improved program requirements and
energy efficiency at District Office
2-0
Project Allocation 10,000,000
(B) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(C) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xviii) Clinton County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
20210SB0292PN0295 - 60 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(B) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 33
Project Allocation 5,000,000
(C) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 34
Project Allocation 5,000,000
(D) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xix) Columbia County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
20210SB0292PN0295 - 61 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
and sewage plant upgrades, at Roadside
Rest Area - Site 37
Project Allocation 5,000,000
(C) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 38
Project Allocation 5,000,000
(D) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xx) Crawford County
(A) Provide for the construction or
renovation of Centerville maintenance
facility, including site acquisition
and development, design and
construction of buildings, systems and
utility work
Project Allocation 7,000,000
(B) Provide for the construction or
renovation of Meadville maintenance
facility, including site acquisition
and development, design and
construction of buildings, systems and
utility work
Project Allocation 7,000,000
20210SB0292PN0295 - 62 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(C) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 19
Project Allocation 5,000,000
(D) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 20
Project Allocation 5,000,000
(E) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxi) Cumberland County
(A) Provide for the construction or
renovation of Carlisle maintenance
facility, including site acquisition
and development, design and
construction of buildings, systems and
utility work
Project Allocation 7,000,000
(B) Provide for the construction or
renovation of Lemoyne maintenance
facility, including site acquisition
20210SB0292PN0295 - 63 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
and development, design and
construction of buildings, systems and
utility work
Project Allocation 7,000,000
(C) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 45
Project Allocation 5,000,000
(D) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 46
Project Allocation 5,000,000
(E) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxii) Dauphin County
(A) Renovation and expansion for code
compliance, upgraded building systems,
improved program requirements and
energy efficiency at District Office
8-0
Project Allocation 10,000,000
20210SB0292PN0295 - 64 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(B) Renovation and expansion for code
compliance, upgraded building systems,
improved program requirements and
energy efficiency at the Material
Testing Lab
Project Allocation 8,000,000
(C) Renovation and expansion for code
compliance, upgraded building systems,
improved program requirements and
energy efficiency at the Fleet
Management Facility
Project Allocation 5,000,000
(D) Construction or renovation of Sign
Shop facility. May include site
acquisition and development, design
and construction of buildings and
utility work
Project Allocation 5,000,000
(E) Provide for the construction or
renovation of Harrisburg maintenance
facility, including site acquisition
and development, design and
construction of buildings, systems and
utility work
Project Allocation 7,000,000
(F) Provide for the construction or
renovation of Elizabethville
maintenance facility, including site
acquisition and development, design
and construction of buildings, systems
20210SB0292PN0295 - 65 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
and utility work
Project Allocation 7,000,000
(G) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 47
Project Allocation 5,000,000
(H) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 48
Project Allocation 5,000,000
(I) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxiii) Delaware County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Renovation, expansion or replacement,
including land acquisition, roof
20210SB0292PN0295 - 66 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Welcome
Center - Site N
Project Allocation 5,000,000
(C) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxiv) Elk County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxv) Erie County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Renovation, expansion or replacement,
20210SB0292PN0295 - 67 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Welcome
Center - Site L
Project Allocation 5,000,000
(C) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Welcome
Center - Site M
Project Allocation 5,000,000
(D) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxvi) Fayette County
(A) Renovation and expansion for code
compliance, upgraded building systems,
improved program requirements and
energy efficiency at District Office
12-0
Project Allocation 10,000,000
(B) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
20210SB0292PN0295 - 68 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 7,000,000
(C) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxvii) Forrest County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxviii) Franklin County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Welcome
20210SB0292PN0295 - 69 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Center - Site G
Project Allocation 5,000,000
(C) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxix) Fulton County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Welcome
Center - Site B
Project Allocation 5,000,000
(C) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 3
Project Allocation 5,000,000
(D) Construction of a new stockpile
facility with land acquisition or
20210SB0292PN0295 - 70 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxx) Greene County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Welcome
Center - Site D
Project Allocation 5,000,000
(C) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxxi) Huntingdon County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
20210SB0292PN0295 - 71 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxxii) Indiana County
(A) Renovation and expansion for code
compliance, upgraded building systems,
improved program requirements and
energy efficiency at District Office
10-0
Project Allocation 10,000,000
(B) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(C) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxxiii) Jefferson County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Renovation, expansion or replacement,
20210SB0292PN0295 - 72 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 25
Project Allocation 5,000,000
(C) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 26
Project Allocation 5,000,000
(D) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxxiv) Juniata County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
20210SB0292PN0295 - 73 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(xxxv) Lackawanna County
(A) Renovation and expansion for code
compliance, upgraded building systems,
improved program requirements and
energy efficiency at District Office
4-0
Project Allocation 10,000,000
(B) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(C) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 55
Project Allocation 5,000,000
(D) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxxvi) Lancaster County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
20210SB0292PN0295 - 74 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxxvii) Lawrence County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 15
Project Allocation 5,000,000
(C) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 16
Project Allocation 5,000,000
(D) Construction of a new stockpile
facility with land acquisition or
20210SB0292PN0295 - 75 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxxviii) Lebanon County
(A) Renovation and expansion for code
compliance, upgraded building systems,
improved program requirements and
energy efficiency at the Eastern
Training Facility
Project Allocation 5,000,000
(B) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(C) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xxxix) Lehigh County
(A) Renovation and expansion for code
compliance, upgraded building systems,
improved program requirements and
energy efficiency at District Office
5-0
Project Allocation 10,000,000
(B) Provide for the construction or
renovation of maintenance facility,
20210SB0292PN0295 - 76 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(C) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xl) Luzerne County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 39
Project Allocation 5,000,000
(C) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 53
Project Allocation 5,000,000
20210SB0292PN0295 - 77 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(D) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 54
Project Allocation 5,000,000
(E) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xli) Lycoming County
(A) Renovation and expansion for code
compliance, upgraded building systems,
improved program requirements and
energy efficiency at District Office
3-0
Project Allocation 10,000,000
(B) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(C) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
20210SB0292PN0295 - 78 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(xlii) McKean County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xliii) Mercer County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Welcome
Center - Site E
Project Allocation 5,000,000
(C) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
20210SB0292PN0295 - 79 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
and sewage plant upgrades, at Roadside
Rest Area - Site 17
Project Allocation 5,000,000
(D) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 18
Project Allocation 5,000,000
(E) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xliv) Mifflin County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xlv) Monroe County
(A) Provide for the construction or
renovation of maintenance facility,
20210SB0292PN0295 - 80 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking
lot, and sewage plant upgrades, at
Welcome Center - Site F
Project Allocation 5,000,000
(C) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 41
Project Allocation 5,000,000
(D) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xlvi) Montgomery County
(A) Renovation and expansion for code
compliance, upgraded building systems,
improved program requirements and
energy efficiency at District Office
6-0
Project Allocation 10,000,000
20210SB0292PN0295 - 81 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(B) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(C) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xlvii) Montour County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 35
Project Allocation 5,000,000
(C) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
20210SB0292PN0295 - 82 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Rest Area - Site 36
Project Allocation 5,000,000
(D) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xlviii) Northampton County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(xlix) Northumberland County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
20210SB0292PN0295 - 83 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 5,000,000
(l) Perry County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(li) Philadelphia County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(lii) Pike County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
20210SB0292PN0295 - 84 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Welcome
Center - Site K
Project Allocation 5,000,000
(C) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking
lot, and sewage plant upgrades, at
Roadside Rest Area - Site 61
Project Allocation 5,000,000
(D) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 62
Project Allocation 5,000,000
(E) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(liii) Potter County
(A) Provide for the construction or
20210SB0292PN0295 - 85 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(liv) Schuylkill County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(lv) Snyder County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new Stockpile
20210SB0292PN0295 - 86 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(lvi) Somerset County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(lvii) Sullivan County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(lviii) Susquehanna County
(A) Provide for the construction or
20210SB0292PN0295 - 87 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Welcome
Center - Site H
Project Allocation 5,000,000
(C) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 56
Project Allocation 5,000,000
(D) Construction of a new stockpile
facility with land acquisition, or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(lix) Tioga County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
20210SB0292PN0295 - 88 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 7,000,000
(B) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Welcome
Center - Site T
Project Allocation 5,000,000
(C) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(lx) Union County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(lxi) Venango County
(A) Renovation and expansion for code
compliance, upgraded building systems,
improved program requirements and
energy efficiency at District Office
20210SB0292PN0295 - 89 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
1-0
Project Allocation 10,000,000
(B) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(C) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Roadside
Rest Area - Site 21
Project Allocation 5,000,000
(D) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking
lot, and sewage plant upgrades, at
Roadside Rest Area - Site 22
Project Allocation 5,000,000
(E) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(lxii) Warren County
(A) Provide for the construction or
renovation of maintenance facility,
20210SB0292PN0295 - 90 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(lxiii) Washington County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Provide for the construction or
renovation of West Brownsville
maintenance facility, including site
acquisition and development, design
and construction of buildings, systems
and utility work
Project Allocation 7,000,000
(C) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking lot
and sewage plant upgrades, at Welcome
Center - Site A
Project Allocation 5,000,000
20210SB0292PN0295 - 91 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(D) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(lxiv) Wayne County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(lxv) Westmoreland County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(lxvi) Wyoming County
20210SB0292PN0295 - 92 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
(lxvii) York County
(A) Provide for the construction or
renovation of maintenance facility,
including site acquisition and
development, design and construction
of buildings, systems and utility work
Project Allocation 7,000,000
(B) Renovation, expansion or replacement,
including land acquisition, roof
replacement, building systems,
sidewalks, curbing, steps, parking
lot, and sewage plant upgrades, at
Welcome Center - Site J
Project Allocation 5,000,000
(C) Construction of a new stockpile
facility with land acquisition or
renovation of an existing facility to
meet code and program requirements
Project Allocation 5,000,000
20210SB0292PN0295 - 93 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Section 4. Itemization of furniture and equipment projects.
Additional capital projects in the category of public
improvement projects consisting of the acquisition of movable
furniture and equipment to complete public improvement projects
and to be purchased by the Department of General Services, its
successors or assigns, and to be financed by the incurring of
debt are hereby itemized, together with their estimated
financial cost, as follows:
Project
Total Project
Allocation
(1) Department of Education
(i) Lincoln University
(A) Provide original furniture and
equipment for Houston Hall
Project Allocation 2,500,000
(ii) The Pennsylvania State University
(A) Davey Laboratory renovation
(University Park campus) original
furniture, fixtures and equipment for
Davey Laboratory at the University
Park campus
Project Allocation 15,000,000
(B) Osmond Laboratory renovation - Phase
II (University Park campus) original
furniture, fixtures and equipment for
Phase II of Osmond Laboratory at the
University Park campus
Project Allocation 6,000,000
(C) Carpenter Building renovation
(University Park campus) original
20210SB0292PN0295 - 94 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
furniture, fixtures and equipment for
the Carpenter Building at the
University Park campus
Project Allocation 6,000,000
(D) Student Support and Services Center
(University Park campus) original
furniture, fixtures and equipment for
the Student Support and Services
Center at the University Park campus
Project Allocation 12,000,000
(E) Electrical Engineering West
renovation (University Park campus)
original furniture, fixtures and
equipment for Electrical Engineering
West at the University Park campus
Project Allocation 8,000,000
(F) Electrical Engineering East
renovation (University Park campus)
original furniture, fixtures and
equipment for Electrical Engineering
East at the University Park campus
Project Allocation 6,000,000
(G) Pattee Library/Paterno Library
renovation (University Park campus)
Pattee Library/Paterno Library
renovation at University Park campus
Project Allocation 6,000,000
(H) Sparks Building renovation
(University Park campus) original
furniture, fixtures and equipment for
20210SB0292PN0295 - 95 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
the Sparks Building at the University
Park campus
Project Allocation 13,000,000
(I) Applied Research Laboratory
renovation (University Park campus)
original furniture, fixtures and
equipment for the Applied Research
Laboratory at the University Park
campus
Project Allocation 7,000,000
(J) Chilled water plant (University Park
campus) original furniture, fixtures
and equipment for a chilled water
plant at the University Park campus
Project Allocation 4,000,000
(K) Advanced water treatment system
(University Park campus) original
furniture, fixtures and equipment for
an advanced water treatment system at
the University Park campus
Project Allocation 3,000,000
(L) Classroom-library building renovation
(and nursing addition) (Scranton
campus) original furniture, fixtures
and equipment for the classroom-
library building renovation (and
nursing addition) at the Scranton
campus
Project Allocation 3,000,000
(M) Kelly Library renovation (and
20210SB0292PN0295 - 96 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
addition) (Greater Allegheny campus)
original furniture, fixtures and
equipment for Kelly Library renovation
(and addition) at the Greater
Allegheny campus
Project Allocation 3,000,000
(N) Classroom/class lab teaching and
learning building (Harrisburg campus)
original furniture, fixtures and
equipment for a classroom/class lab
teaching and learning building at the
Harrisburg campus
Project Allocation 5,000,000
(O) Teaching and administrative support
building (Hershey campus) original
furniture, fixtures and equipment for
a teaching and administrative support
building at the Hershey campus
Project Allocation 12,000,000
(P) Academic and research building
(Hershey campus) original furniture,
fixtures and equipment for an academic
and research building at the Hershey
campus
Project Allocation 10,000,000
(iii) Thaddeus Stevens College of Technology
(A) Original furniture, fixtures and
equipment for dormitory buildings
Project Allocation 125,000
(B) Original furniture, fixtures and
20210SB0292PN0295 - 97 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
equipment for Transportation Center
Project Allocation 3,500,000
(2) Department of General Services
(i) Department of General Services
(A) Provide original furniture and
equipment for the Finance Building
Project Allocation 25,000,000
(B) Provide original furniture and
equipment for the Scranton State
Office Building
Project Allocation 3,500,000
(C) Provide original furniture and
equipment for the Reading Office
Building
Project Allocation 3,500,000
(3) Pennsylvania Historical and Museum
Commission
(i) Pennsylvania State Archive Building
(A) Provide original furniture and
equipment for facility
Project Allocation 3,000,000
(4) Department of Military and Veterans Affairs
(i) Delaware Valley Veterans Home
(A) Provide original furniture and
equipment for new nursing care
addition and new adult day health care
program
Project Allocation 3,814,190
(ii) Gino J. Merli Veterans Center
(A) Provide original furniture and
20210SB0292PN0295 - 98 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
equipment for new adult day health
care program
Project Allocation 500,000
(iii) Hollidaysburg Veterans Home
(A) Provide original furniture and
equipment for new adult day health
care program
Project Allocation 500,000
(iv) Pennsylvania Soldiers' & Sailors' Home,
Erie
(A) Provide original furniture and
equipment for new adult day health
care program
Project Allocation 500,000
(v) Southwestern Veterans' Center, Pittsburgh
(A) Provide original furniture and
equipment for new adult day health
care program
Project Allocation 500,000
(vi) Allentown Readiness Center
(A) Provide original furniture and
equipment for Allentown Readiness
Center
Project Allocation 1,000,000
(vii) Beaver Falls
(A) Provide original furniture and
equipment for Beaver Falls Readiness
Center
Project Allocation 1,000,000
(viii) Berks County Readiness Centers
20210SB0292PN0295 - 99 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Provide original furniture and
equipment for Berks County Readiness
Centers
Project Allocation 2,000,000
(ix) Cambridge Springs Readiness Center
(A) Provide original furniture and
equipment for Cambridge Springs
Readiness Center
Project Allocation 1,000,000
(x) Carlisle Readiness Center
(A) Provide original furniture and
equipment for Carlisle Readiness
Center
Project Allocation 1,000,000
(xi) Chambersburg Readiness Center
(A) Provide original furniture and
equipment for Chambersburg Readiness
Center
Project Allocation 1,000,000
(xii) Coatesville Readiness Center
(A) Provide original furniture and
equipment for Coatesville Readiness
Center
Project Allocation 1,000,000
(xiii) Easton Readiness Center
(A) Provide original furniture and
equipment for Easton Readiness Center
Project Allocation 1,000,000
(xiv) Everett Readiness Center
(A) Provide original furniture and
20210SB0292PN0295 - 100 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
equipment for Everett Readiness Center
Project Allocation 1,000,000
(xv) Fort Indiantown Gap DMVA facilities
(A) Provide original furniture and
equipment for Fort Indiantown Gap DMVA
facilities
Project Allocation 10,000,000
(xvi) Greensburg Readiness Center
(A) Provide original furniture and
equipment for Greensburg Readiness
Center
Project Allocation 1,000,000
(xvii) Huntingdon Readiness Center
(A) Provide original furniture and
equipment for Huntingdon Readiness
Center
Project Allocation 1,000,000
(xviii) Lebanon Readiness Center
(A) Provide original furniture and
equipment for Lebanon Readiness Center
Project Allocation 1,000,000
(xix) Lewisburg Readiness Center
(A) Provide original furniture and
equipment for Lewisburg Readiness
Center
Project Allocation 1,000,000
(xx) Lewistown Readiness Center
(A) Provide original furniture and
equipment for Lewistown Readiness
Center
20210SB0292PN0295 - 101 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 1,000,000
(xxi) Luzerne County Readiness Centers
(A) Provide original furniture and
equipment for Luzerne Readiness
Centers
Project Allocation 5,000,000
(xxii) Philadelphia/Delaware Counties
(A) Provide original furniture and
equipment for Philadelphia/Delaware
County Readiness Centers
Project Allocation 4,000,000
(xxiii) Punxsutawney Readiness Center
(A) Provide original furniture and
equipment for Punxsutawney Readiness
Center
Project Allocation 500,000
(xxiv) South Mountain Readiness Center
(A) Provide original furniture and
equipment for South Mountain Readiness
Center
Project Allocation 500,000
(xxv) Tamaqua Readiness Center
(A) Provide original furniture and
equipment for Tamaqua Readiness Center
Project Allocation 1,000,000
(xxvi) Wellsboro Readiness Center
(A) Provide original furniture and
equipment for Wellsboro Readiness
Center
Project Allocation 1,000,000
20210SB0292PN0295 - 102 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(5) State System of Higher Education
(i) Edinboro University
(A) Provide original furniture and
equipment for Hamilton Hall renovation
Project Allocation 2,500,000
(ii) Shippensburg University
(A) Provide original furniture and
equipment for Heiges Field House
renovation and addition
Project Allocation 4,000,000
(B) Original furniture and equipment for
Old Main renovation
Project Allocation 1,500,000
(7) Department of Transportation
(i) Adams County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(ii) Allegheny County
(A) Provide original furniture and
equipment for District Office 11-0
Project Allocation 2,000,000
(B) Provide original furniture and
equipment for maintenance facilities
Project Allocation 1,200,000
(iii) Armstrong County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(iv) Beaver County
20210SB0292PN0295 - 103 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(v) Bedford County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(vi) Berks County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(vii) Blair County
(A) Provide original furniture and
equipment for District Office 9-0
Project Allocation 2,000,000
(B) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(viii) Bradford County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(ix) Bucks County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(x) Butler County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
20210SB0292PN0295 - 104 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(xi) Cambria County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xii) Cameron County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xiii) Carbon County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xiv) Centre County
(A) Provide original furniture and
equipment for maintenance facilities
Project Allocation 1,200,000
(xv) Chester County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xvi) Clarion County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xvii) Clearfield County
(A) Provide original furniture and
equipment for District Office 2-0
Project Allocation 2,000,000
(B) Provide original furniture and
equipment for maintenance facility
20210SB0292PN0295 - 105 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 600,000
(xviii) Clinton County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xix) Columbia County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xx) Crawford County
(A) Provide original furniture and
equipment for maintenance facilities
Project Allocation 1,200,000
(xxi) Cumberland County
(A) Provide original furniture and
equipment for maintenance facilities
Project Allocation 1,200,000
(xxii) Dauphin County
(A) Provide original furniture and
equipment for District Office 8-0
Project Allocation 2,000,000
(B) Provide original furniture and
equipment for maintenance facilities
Project Allocation 1,200,000
(xxiii) Delaware County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xxiv) Elk County
(A) Provide original furniture and
20210SB0292PN0295 - 106 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
equipment for maintenance facility
Project Allocation 600,000
(xxv) Erie County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xxvi) Fayette County
(A) Provide original furniture and
equipment for District Office 12-0
Project Allocation 2,000,000
(B) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xxvii) Forrest County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xxviii) Franklin County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xxix) Fulton County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xxx) Greene County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xxxi) Huntingdon County
20210SB0292PN0295 - 107 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xxxii) Indiana County
(A) Provide original furniture and
equipment for District Office 10-0
Project Allocation 2,000,000
(B) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xxxiii) Jefferson County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xxxiv) Juniata County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xxxv) Lackawanna County
(A) Provide original furniture and
equipment for District Office 4-0
Project Allocation 2,000,000
(B) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xxxvi) Lancaster County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xxxvii) Lawrence County
20210SB0292PN0295 - 108 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xxxviii) Lebanon County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xxxix) Lehigh County
(A) Provide original furniture and
equipment for District Office 5-0
Project Allocation 2,000,000
(B) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xl) Luzerne County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xli) Lycoming County
(A) Provide original furniture and
equipment for District Office 3-0
Project Allocation 2,000,000
(B) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xlii) McKean County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xliii) Mercer County
20210SB0292PN0295 - 109 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xliv) Mifflin County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xlv) Monroe County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xlvi) Montgomery County
(A) Provide original furniture and
equipment for District Office 6-0
Project Allocation 2,000,000
(B) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xlvii) Montour County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xlviii) Northampton County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(xlix) Northumberland County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
20210SB0292PN0295 - 110 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(l) Perry County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(li) Philadelphia County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(lii) Pike County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(liii) Potter County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(liv) Schuylkill County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(lv) Snyder County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(lvi) Somerset County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(lvii) Sullivan County
(A) Provide original furniture and
20210SB0292PN0295 - 111 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
equipment for maintenance facility
Project Allocation 600,000
(lviii) Susquehanna County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(lix) Tioga County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(lx) Union County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(lxi) Venango County
(A) Provide original furniture and
equipment for District Office 1-0
Project Allocation 2,000,000
(B) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(lxii) Warren County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(lxiii) Washington County
(A) Provide original furniture and
equipment for maintenance facilities
Project Allocation 1,200,000
(lxiv) Wayne County
20210SB0292PN0295 - 112 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(lxv) Westmoreland County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(lxvi) Wyoming County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
(lxvii) York County
(A) Provide original furniture and
equipment for maintenance facility
Project Allocation 600,000
Section 5. Itemization of Manufacturing Fund capital projects.
Capital projects in the category of public improvement
projects to be acquired or developed by the Department of
General Services, its successors and assigns, for the Department
of Corrections and to be financed from current revenues of the
Manufacturing Fund are hereby itemized, together with their
respective estimated costs, as follows:
Project
Total Project
Allocation
Section 6. Itemization of redevelopment assistance projects.
Additional capital projects in the category of redevelopment
assistance projects for capital grants by the Department of
20210SB0292PN0295 - 113 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Community and Economic Development, its successors or assigns,
authorized under the provisions of the act of May 20, 1949
(P.L.1633, No.493), known as the Housing and Redevelopment
Assistance Law, and redevelopment assistance capital projects
and to be financed by the incurring of debt, are hereby
itemized, together with their estimated financial costs, as
follows:
Project
Total Project
Allocation
Section 7. Itemization of flood control projects.
Additional capital projects in the category of flood control
projects to be constructed by the Department of Environmental
Protection, its successors or assigns and to be financed by the
incurring of debt are hereby itemized, together with their
respective estimated costs, as follows:
Project
Total Project
Allocation
(i) Bucks County
(A) Core Creek Dam flood control -
rehabilitation
Project Allocation 1,700,000
(ii) Crawford County
(A) Rainbow Dam flood control -
rehabilitation
Project Allocation 900,000
(iii) Pike County
(A) Kintz Creek Dam flood control -
20210SB0292PN0295 - 114 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
rehabilitation
Project Allocation 2,300,000
(iv) Tioga County
(A) Hamilton Dam flood control -
rehabilitation
Project Allocation 1,800,000
Section 8. Debt authorization.
(a) Public improvements.--The Governor, Auditor General and
State Treasurer are hereby authorized and directed to borrow
from time to time in addition to any authorization heretofore or
hereafter enacted, on the credit of the Commonwealth, subject to
the limitations provided in the current capital budget, money
not exceeding in the aggregate the sum specified in section
2(a).
(b) Furniture and equipment.--The Governor, Auditor General
and State Treasurer are hereby authorized and directed to borrow
from time to time in addition to any authorization heretofore or
hereafter enacted on the credit of the Commonwealth, subject to
the limitations provided in the current capital budget, money
not exceeding in the aggregate the sum specified in section 2(b)
as may be found necessary to carry out the acquisition and
construction of the public improvement projects consisting of
the acquisition of original movable furniture and equipment
specifically itemized in the capital budget.
(c) Redevelopment assistance.--Subject to the limitations in
section 317(b) of the act of February 9, 1999 (P.L.1, No.1),
known as the Capital Facilities Debt Enabling Act, the Governor,
Auditor General and State Treasurer are hereby authorized and
directed to borrow from time to time in addition to any
authorization heretofore or hereafter enacted on the credit of
20210SB0292PN0295 - 115 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
the Commonwealth, subject to the limitations provided in the
current capital budget, money not exceeding in the aggregate the
sum specified in section 2(d) as may be found necessary to carry
out the redevelopment assistance capital projects specifically
itemized in the capital budget.
(d) Flood control.--The Governor, Auditor General and State
Treasurer are hereby authorized and directed to borrow from time
to time in addition to any authorization heretofore or hereafter
enacted, on the credit of the Commonwealth, subject to the
limitations provided in the current capital budget, money not
exceeding in the aggregate the sum specified in section 2(e) as
may be found necessary to carry out the acquisition and
construction of the flood control projects specifically itemized
in a capital budget.
Section 9. Issue of bonds.
The indebtedness authorized in this act shall be incurred
from time to time and shall be evidenced by one or more series
of general obligation bonds of the Commonwealth in such
aggregate principal amount for each series as the Governor, the
Auditor General and the State Treasurer shall determine, but the
latest stated maturity date shall not exceed the estimated
useful life of the projects being financed as stated in section
10.
Section 10. Estimated useful life and term of debt.
(a) Estimated useful life.--The General Assembly states that
the estimated useful life of the public improvement projects
itemized in this act is as follows:
(1) Public improvement projects, 30 years.
(2) Furniture and equipment, 10 years.
(b) Term of debt.--The maximum term of the debt authorized
20210SB0292PN0295 - 116 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
to be incurred under this act is 30 years.
Section 11. Appropriations.
(a) Public improvements.--The net proceeds of the sale of
the obligations authorized in this act are hereby appropriated
from the Capital Facilities Fund to the Department of General
Services in the maximum amount specified in section 2(a) to be
used by it exclusively to defray the financial cost of the
public improvement projects specifically itemized in a capital
budget. After reserving or paying the expenses of the sale of
the obligation, the State Treasurer shall pay to the Department
of General Services the money as required and certified by it to
be legally due and payable.
(b) Furniture and equipment.--The net proceeds of the sale
of the obligations authorized in this act are hereby
appropriated from the Capital Facilities Fund to the Department
of General Services in the maximum amount specified in section
2(b) to be used by it exclusively to defray the financial cost
of the public improvement projects consisting of the acquisition
of original movable furniture and equipment specifically
itemized in a capital budget. After reserving or paying the
expenses of the sale of the obligation, the State Treasurer
shall pay to the Department of General Services the money as
required and certified by it to be legally due and payable.
(c) Redevelopment assistance.--The net proceeds of the sale
of the obligations authorized in this act are hereby
appropriated from the Capital Facilities Fund to the Department
of Community and Economic Development in the maximum amount
specified in section 2(d) to be used by it exclusively to defray
the financial cost of the redevelopment assistance capital
projects specifically itemized in a capital budget. After
20210SB0292PN0295 - 117 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
reserving or paying the expenses of the sale of the obligation,
the State Treasurer shall pay to the Department of Community and
Economic Development the money as required and certified by it
to be legally due and payable.
(d) Flood control.--The net proceeds of the sale of the
obligations authorized in this act are hereby appropriated from
the Capital Facilities Fund to the Department of Environmental
Protection in the maximum amount specified in section 2(e) to be
used by it exclusively to defray the financial cost of the flood
control projects specifically itemized in a capital budget.
After reserving or paying the expenses of the sale of the
obligation, the State Treasurer shall pay to the Department of
Environmental Protection the money as required and certified by
it to be legally due and payable.
Section 12. Federal funds.
(a) Projects itemized in this act.--All money received from
the Federal Government for the projects specifically itemized in
this act are also hereby appropriated for those projects.
(b) Projects not requiring itemization.--Department of
Military and Veterans Affairs construction projects which are
totally federally funded and to be administered by the
Department of General Services are hereby authorized.
Section 13. Editorial changes.
In editing and preparing this act for printing following the
final enactment, the Legislative Reference Bureau shall insert
or revise letters or numbers for projects where the letters or
numbers are missing or require revision. The Legislative
Reference Bureau shall also revise the total monetary amounts
for the total authorization, debt authorization, appropriations
and department totals as necessary to agree with the total
20210SB0292PN0295 - 118 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
monetary amounts of the projects.
Section 14. Effective date.
This act shall take effect immediately.