AN ACT

 

1Providing for the capital budget for the fiscal year <-2012-2013
<-22013-2014; itemizing public improvement projects, furniture
3and equipment projects, transportation assistance projects,
4redevelopment assistance capital projects, flood control
5projects, Keystone Recreation, Park and Conservation Fund
6projects, State forestry bridge projects, State
7ATV/Snowmobile Fund projects, Pennsylvania Fish and Boat 
8Commission projects, Manufacturing Fund projects, Oil and Gas 
9Lease Fund projects <-and, Environmental Stewardship Fund 
10projects <-and, highway bridge projects and State Stores Fund 
11current revenue projects to be constructed or acquired or
12assisted by the Department of General Services, the
13Department of Community and Economic Development, the
14Department of Conservation and Natural Resources, the
15Department of Environmental Protection, the Department of
16Transportation or the Pennsylvania Fish and Boat Commission,
17together with their estimated financial costs; authorizing
18the incurring of debt without the approval of the electors
19for the purpose of financing the projects to be constructed,
20acquired or assisted by the Department of General Services,
21the Department of Community and Economic Development, the
22Department of Conservation and Natural Resources, the
23Department of Environmental Protection, the Department of
24Transportation or the Pennsylvania Fish and Boat Commission;
25stating the estimated useful life of the projects; and making
26appropriations.

27The General Assembly of the Commonwealth of Pennsylvania
28hereby enacts as follows:

1Section 1. Short title.

2This act shall be known and may be cited as the Capital
3Budget Project Itemization Act of <-2012-2013 2013-2014.

4Section 2. Total authorizations.

5(a) Public improvements.--The total authorization for the
6additional capital projects in the category of public
7improvement projects itemized in section 3 and to be acquired or
8constructed by the Department of General Services, its
9successors or assigns, and to be financed by the incurring of
10debt, shall be <-$3,572,285,000 $3,897,449,000 $3,977,449,000 
<-11$4,664,749,000.

12(b) Furniture and equipment.--The total authorization for
13the additional capital projects in the category of public
14improvement projects consisting of the acquisition of original
15movable furniture and equipment to complete public improvement
16projects itemized in section 4 and to be acquired by the
17Department of General Services, its successors or assigns, and
18to be financed by the incurring of debt, shall be $137,620,000<- 
19$138,120,000 $150,120,000 $165,120,000<-.

20(c) Transportation assistance.--The total authorization for
21the capital projects in the category of transportation
22assistance projects itemized in section 5 with respect to which
23an interest is to be acquired in or constructed by the
24Department of Transportation, its successors or assigns, and to
25be financed by the incurring of debt, shall be $1,718,429,000<- 
26$1,823,639,000 $1,846,93<-9,000 $1,931,709,000.

27(d) Redevelopment assistance.--The total authorization for
28the capital projects in the category of redevelopment assistance
29capital projects itemized in section 6 for capital grants by the
30Department of Community and Economic Development, its successors

1or assigns, and to be financed by the incurring of debt, shall
2be <-$3,965,614,000 $6,077,447,000 $6,438,618,000 $6,744,668,000.

3(e) Flood control.--The total authorization for the capital
4projects in the category of flood control projects itemized in
5section 7 and to be constructed by the Department of
6Environmental Protection, its successors or assigns, and to be
7financed by the incurring of debt, shall be $78,702,000<- 
8$127,852,000 $13<-7,852,000.

9(f) Keystone Recreation, Park and Conservation Fund.--The
10total authorization for the capital projects in the category of
11public improvement projects itemized in section 8 and to be
12constructed by the Department of Conservation and Natural
13Resources, its successors or assigns, and to be financed from
14current revenues in the Keystone Recreation, Park and
15Conservation Fund, shall be $59,202,000.

16(g) State forestry bridge projects.--The total authorization
17for the capital projects itemized in section 9 to be constructed
18by the Department of Conservation and Natural Resources, its
19successors or assigns, and to be financed by oil company
20franchise tax revenues pursuant to 75 Pa.C.S. § 9502(a)(2)(iv)
21(relating to imposition of tax), shall be $25,155,000.

22(h) State ATV/snowmobile projects.--The total authorization
23for the capital projects itemized in section 10 to be
24constructed by the Department of Conservation and Natural
25Resources, its successors or assigns, and to be financed from
26current revenues in the State ATV/Snowmobile Fund, shall be 
27$250,000.

28(i) Fish Fund and Boat Fund projects.--The total
29authorization for the capital projects in the category of public
30improvement projects itemized in section 11 to be acquired or

1developed by the Pennsylvania Fish and Boat Commission and to be
2financed by the incurring of debt or by current revenues of the
3Fish Fund and the Boat Fund pursuant to executive authorization
4shall be $128,741,000<- $136,241,000.

5(j) Manufacturing Fund current revenue projects.--The total
6authorization for the capital projects in the category of public
7improvement projects itemized in section 12 and to be
8constructed by the Department of General Services, its
9successors or assigns, and to be financed from current revenues
10in the Manufacturing Fund, shall be $7,500,000.

11(k) Oil and Gas Lease Fund current revenue projects.--The
12total authorization for the capital projects in the category of
13public improvement projects itemized in section 13 to be
14acquired or developed by the Department of Conservation and
15Natural Resources and to be financed by current revenues of the
16Oil and Gas Lease Fund pursuant to executive authorization shall
17be $698,000.

18(l) Environmental Stewardship Fund current revenue
19projects.--The total authorization for the capital projects in
20the category of public improvement projects itemized in section
2114 to be acquired or developed by the Department of Conservation
22and Natural Resources and to be financed by current revenues of
23the Environmental Stewardship Fund pursuant to executive
24authorization shall be $900,000.

<-25(m) Highway bridge projects.--The total authorization for
26capital projects in the category of highway bridge projects
27itemized in section 15 to be constructed by the Department of
28Transportation, its successors or assigns, and to be financed by
29the incurring of debt or from current revenue shall be $190,000.
30As used in this subsection, the term "capital project" shall

1mean a capital project as defined in section 302 of the act of
2February 9, 1999 (P.L.1, No.1), known as the Capital Facilities
3Debt Enabling Act, and shall include a county or municipal
4bridge rehabilitation, replacement or improvement project as set
5forth in section 15.

6(n) State Stores Fund current revenue projects.--The total<-
7authorization for the capital projects in the category of public
8improvement projects itemized in section 15.1 and to be
9developed by the Department of General Services, its successors
10or assigns, for the Pennsylvania Liquor Control Board, and to be
11financed from current revenues of the State Stores Fund shall be
12$4,000,000.

13Section 3. Itemization of public improvement capital projects.

14(a) General rule.--Additional capital projects in the
15category of public improvement projects to be constructed or
16acquired by the Department of General Services, its successors
17or assigns, and to be financed by the incurring of debt, are
18hereby itemized, together with their respective estimated
19financial costs, as follows:

20 

21Project

Total Project

Allocation

22(1) Department of Agriculture

 

23(i) Farm Show Complex

 

24(A) Upgrade Farm Show Complex, including 
25new entrance to Expo Hall with meeting 
26rooms and covered walkway

 

27Project Allocation

3,000,000

28(Base Project Allocation - $3,000,000)

 

<-29(B) Repave parking lot adjacent to
30Elmerton Avenue lot

 

1(B) Upgrade and improvements to parking
2areas

 

3Project Allocation

2,000,000

4(Base Project Allocation - $2,000,000)

 

<-5(C) Construct new parking garage to
6accommodate increased patronage during
7large show events

 

8Project Allocation

10,000,000

9(Base Project Allocation -
10$10,000,000)

 

<-11(C) Land acquisition, demolition,
12construction, infrastructure and other
13related costs for development and
14expansion of Farm Show Complex parking
15facilities.

 

16Project Allocation

10,000,000

17(Base Project Allocation -
18$10,000,000)

 

19(ii) Health Diagnostic Laboratory

 

20(A) Construct new plant industry
21laboratory in Harrisburg to satisfy
22modern testing procedures

 

23Project Allocation

10,000,000

24(Base Project Allocation -
25$10,000,000)

 

26(B) Construct new Pennsylvania Equine
27Toxicology and Research Laboratory on
28New Bolton Campus of The University of
29Pennsylvania

 

30Project Allocation

7,000,000

1(Base Project Allocation - $7,000,000)

 

2(2) Department of Conservation and Natural
3Resources

 

4(i) Bald Eagle State Forest

 

5(A) Repair roadways, including drainage 
6along Poe Valley Road

 

7Project Allocation

960,000

8(Base Project Allocation - $800,000)

 

9(Design & Contingencies - $160,000)

 

10(i.1) Bald Eagle State Park

 

11(A) Construct an addition to the park
12office and maintenance building

 

13Project Allocation

4,080,000

14(Base Project Allocation - $3,400,000)

 

15(Design & Contingencies - $680,000)

 

16(i.2) Black Moshannon State Park

 

17(A) Develop ten additional family cabins
18with vehicle access and connection of
19utilities

 

20Project Allocation

3,000,000

21(Base Project Allocation - $2,400,000)

 

22(Design & Contingencies - $600,000)

 

23(ii) Blue Knob State Park

 

24(A) Replace two office buildings and
25combine into one modern office
26building

 

27Project Allocation

2,400,000

28(Base Project Allocation - $2,400,000)

 

29(ii.1) Buchanan State Forest

 

30(A) Construction of a new maintenance
 

 

1headquarters

 

2Project Allocation

3,000,000

3(Base Project Allocation - $2,500,000)

 

4(Design & Contingencies - $500,000)

 

5(iii) Caledonia State Park

 

6(A) Rehabilitate campground restrooms and
7shower houses with modern facilities

 

8Project Allocation

3,000,000

9(Base Project Allocation - $3,000,000)

 

10(B) Replace water lines throughout park

 

11Project Allocation

900,000

12(Base Project Allocation - $900,000)

 

13(iv) Cherry Springs State Park

 

14(A) Construct visitors and administrative
15center to accommodate increased park
16usage

 

17Project Allocation

8,000,000

18(Base Project Allocation - $8,000,000)

 

19(v) Codorus State Park

 

<-20(A) Rehabilitate and pave roads and
21parking lots for visitor safety

 

22Project Allocation

2,400,000

23(Base Project Allocation - $2,400,000)

 

24(B) Rehabilitate and pave roads and 
25parking lots for visitor safety

 

26Project Allocation

2,400,000

27(Base Project Allocation - $2,400,000)

 

<-28(A) Rehabilitate and pave roads and
29parking lots for visitor safety

 

30Project Allocation

4,800,000

1(Base Project Allocation - $4,800,000)

 

2(vi) Colonel Denning State Park

 

3(A) Replace pit restroom, add sewer lines
4and replace campground restrooms and
5shower houses with modern facilities

 

6Project Allocation

1,800,000

7(Base Project Allocation - $1,800,000)

 

8(vii) Cowans Gap State Park

 

9(A) Construct park office addition and
10maintenance building addition

 

11Project Allocation

1,200,000

12(Base Project Allocation - $1,200,000)

 

13(viii) Delaware Canal State Park

 

14(A) Provide for repair and ongoing
15maintenance of Delaware Canal

 

16Project Allocation

10,000,000

17(Base Project Allocation -
18$10,000,000)

 

19(B) Replacement of 12 adjacent box beam 
20bridges along Delaware Canal

 

21Project Allocation

16,200,000

22(Base Project Allocation -
23$13,500,000)

 

24(Design & Contingencies - $2,700,000)

 

25(C) Construct a new resource center with 
26storage building to meet current needs

 

27Project Allocation

3,300,000

28(Base Project Allocation - $2,750,000)

 

29(Design & Contingencies - $550,000)

 

30(D) Rehabilitate Pecks Pond Dam

 

1Project Allocation

7,200,000

2(Base Project Allocation - $6,000,000)

 

3(Design & Contingencies - $1,200,000)

 

<-4(E) Construction, infrastructure,
5redevelopment and other related costs
6for rehabilitation of THE Delaware
7Canal State Park in Riegelsville to
8Bristol

 

9Project Allocation

5,000,000

10(Base Project Allocation - $5,000,000)

 

11(viii.1) Delaware State Forest

 

12(A) Construct a new resource center with 
13storage building

 

14Project Allocation

8,400,000

15(Base Project Allocation - $7,000,000)

 

16(Design & Contingencies - $1,400,000)

 

17(ix) Denton Hill State Park

 

18(A) Rehabilitate park, including ski
19lodge, ski lifts, snowmaking
20equipment, roads, parking lots, modern
21cabins and maintenance facilities for
22a four-season operation

 

23Project Allocation

12,000,000

24(Base Project Allocation -
25$12,000,000)

 

26(ix.1) Forbes State Forest

 

27(A) Remediate three acid mines 
28originating on State forest lands

 

29Project Allocation

1,800,000

30(Base Project Allocation - $1,500,000)

 

1(Design & Contingencies - $300,000)

 

2(x) Forest District 10

 

3(A) Replace failed acid mine drainage
4treatment system to reduce pollutants
5in Kettle Creek watershed

 

6Project Allocation

2,000,000

7(Base Project Allocation - $2,000,000)

 

8(xi) Forest District 11

 

9(A) Construct bridge over Lehigh River to
10provide public and administrative
11access to Blue Ridge Tract of
12Lackawanna State Forest with public
13parking

 

14Project Allocation

3,500,000

15(Base Project Allocation - $3,500,000)

 

16(xii) Forest District 12

 

17(A) Construct bridge over Slate Run

 

18Project Allocation

1,000,000

19(Base Project Allocation - $1,000,000)

 

20(B) Demolish old building and build
21public restrooms and contact station
22on Pine Creek Rail Trail

 

23Project Allocation

4,500,000

24(Base Project Allocation - $4,500,000)

 

25(xiii) Forest District 13

 

26(A) Remediate and reclaim acid mine
27drainage pollution source on
28Commonwealth's land into Little Dents
29Run watershed

 

30Project Allocation

8,000,000

1(Base Project Allocation - $8,000,000)

 

2(xiv) Forest District 14

 

3(A) Locate, plug and retire abandoned oil
4and gas wells on State forest land

 

5Project Allocation

2,000,000

6(Base Project Allocation - $2,000,000)

 

7(xv) Gifford Pinchot State Park

 

8(A) Replace water lines which are in
9continual need of repair

 

10Project Allocation

1,560,000

11(Base Project Allocation - $1,560,000)

 

12(B) Repave main road, including drainage

 

13Project Allocation

780,000

14(xvi) Greenwood Furnace State Park

 

15(A) Construct new maintenance building to
16meet modern codes

 

17Project Allocation

1,800,000

18(Base Project Allocation - $1,800,000)

 

19(xvii) Hickory Run State Park

 

<-20(A) Construct new visitors center with
21administration facilities and comfort
22station and demolish old center

 

23Project Allocation

7,500,000

24(Base Project Allocation - $7,500,000)

 

<-25(A) Construct new visitors center with
26administration facilities and comfort
27station and demolish old center

 

28Project Allocation

8,000,000

29(Base Project Allocation - $8,000,000)

 

30(B) Develop and construct family cabin

 

1colony within park

 

2Project Allocation

3,000,000

3(Base Project Allocation - $3,000,000)

 

4(C) Rehabilitate and upgrade office to
5accommodate personnel

 

6Project Allocation

8,000,000

7(Base Project Allocation - $8,000,000)

 

8(xviii) Kettle Creek State Park

 

9(A) Dredge lake and provide for improved
10quality recreational opportunities in
11and around Kettle Creek Reservoir

 

12Project Allocation

2,000,000

13(Base Project Allocation - $1,600,000)

 

14(Design & Contingencies - $400,000)

 

15(xviii.1) Kinzua Bridge State Park

 

16(A) Additional funds for DGS project 130-
171, Phase 2, construction of new
18office/visitor center, maintenance
19center, roads, trails, parking lots,
20water and sewage systems, clearing and
21grubbing of debris field, fencing of
22debris field, rehabilitation of
23remaining bridge towers and related
24site work

 

25Project Allocation

3,000,000

26(Base Project Allocation - $2,400,000)

 

27(Design & Contingencies - $600,000)

 

28(B) Construction of site improvements,
29including infrastructure and land
30acquisition

 

1Project Allocation

2,000,000

2(Base Project Allocation - $1,600,000)

 

3(Design & Contingencies - $400,000)

 

4(xviii.2) Kittanning State Forest

 

5(A) Restore iron furnace

 

6Project Allocation

1,600,000

7(Base Project Allocation - $1,500,000)

 

8(Design & Contingencies - $100,000)

 

9(xviii.3) Lackawanna State Forest

 

10(A) Breach and remove Olyphant #1 Dam

 

11Project Allocation

900,000

12(Base Project Allocation - $750,000)

 

13(Design & Contingencies - $150,000)

 

14(xix) Lackawanna State Park

 

15(A) Replace pool

 

16Project Allocation

6,000,000

17(Base Project Allocation - $4,800,000)

 

18(Design & Contingencies - $1,200,000)

 

19(xx) Laurel Mountain State Park

 

20(A) Develop Phase II of ski area, adding
21ski and visitor service, including
22support facilities, lifts and tubing
23park

 

24Project Allocation

3,000,000

25(Base Project Allocation - $3,000,000)

 

26(xx.1) Lehigh Gorge State Park

 

27(A) Rehabilitate White Haven public 
28access area to include trail 
29improvement, parking facilities, 
30modern comfort station and boat launch

 

1Project Allocation

4,122,000

2(Base Project Allocation - $3,435,000)

 

3(Design & Contingencies - $687,000)

 

4(xx.2) Little Buffalo State Park

 

5(A) Replacement of old cottages

 

6Project Allocation

500,000

7(Base Project Allocation - $400,000)

 

8(Design & Contingencies - $100,000)

 

9(xxi) Maurice K. Goddard State Park

 

10(A) Replace existing marina facility with
11new structure for boat concession
12operations, public restrooms and
13meeting room space

 

14Project Allocation

2,400,000

15(Base Project Allocation - $2,400,000)

 

16(xxi.1) Michaux State Forest

 

17(A) Rehabilitate Old Forge Picnic area, 
18pump house and dredge pond to meet 
19modern codes

 

20Project Allocation

450,000

21(Base Project Allocation - $350,000)

 

22(Design & Contingencies - $100,000)

 

23(xxii) Moraine State Park

 

24(A) Upgrade sewage treatment facilities

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(xxiii) Ohiopyle State Park

 

28(A) Develop family cabin colony with
29vehicle access and connection of
30utilities

 

1Project Allocation

3,000,000

2(Base Project Allocation - $2,400,000)

 

3(Design & Contingencies - $600,000)

 

4(B) Improvements to Ferncliff parking lot 
5and provide additional parking 
6facilities adjacent to the falls area

 

7Project Allocation

3,600,000

8(Base Project Allocation - $3,000,000)

 

9(Design & Contingencies - $600,000)

 

10(xxiii.1) Park Region #2

 

11(A) Removal of ten underground fuel tanks 
12and remediate the land in seven State 
13parks and replace aboveground tanks

 

14Project Allocation

3,300,000

15(Base Project Allocation - $2,750,000)

 

16(Design & Contingencies - $550,000)

 

17(xxiv) Penn Nursery and Woodshop

 

18(A) Replace outdated maintenance shop to
19meet current code requirements

 

20Project Allocation

5,500,000

21(Base Project Allocation - $5,500,000)

 

22(xxiv.1) Pine Grove Furnace State Park

 

23(A) Replacement of waterlines throughout 
24park

 

25Project Allocation

2,040,000

26(Base Project Allocation - $1,700,000)

 

27(Design & Contingencies - $340,000)

 

28(xxv) Point State Park

 

29(A) Connect Great Allegheny Passage Trail
30to Point State Park and rehabilitate

 

1flag bastion, pedestrian access and
2parking lots

 

3Project Allocation

9,000,000

4(Base Project Allocation - $9,000,000)

 

5(xxvi) Presque Isle State Park

 

6(A) Replenish sand to maintain beach

 

7Project Allocation

10,000,000

8(Base Project Allocation -
9$10,000,000)

 

10(B) Replace three beach/shower houses,
11including design, site location and
12construction

 

13Project Allocation

3,600,000

14(Base Project Allocation - $3,600,000)

 

15(xxvii) Prince Gallitzin State Park

 

16(A) Replace two pit restrooms with modern
17facilities at Wyerough and sailboat
18mooring areas

 

19Project Allocation

960,000

20(Base Project Allocation - $960,000)

 

21(B) Replace water lines throughout park

 

22Project Allocation

3,240,000

23(Base Project Allocation - $3,240,000)

 

24(C) Repave main road, including drainage
25to beach

 

26Project Allocation

2,400,000

27(Base Project Allocation - $2,400,000)

 

28(D) Replacement of six miles of water
29lines within the park

 

30Project Allocation

5,000,000

1(Base Project Allocation - $4,000,000)

 

2(Design & Contingencies - $1,000,000)

 

3(xxviii) Pymatuning State Park

 

4(A) Rehabilitate campground facilities
5for full-service hook-ups, including
6new water well, water storage tanks
7and sewage collection system

 

8Project Allocation

2,400,000

9(Base Project Allocation - $2,400,000)

 

10(B) Replacement of existing livery docks
11throughout the park

 

12Project Allocation

3,600,000

13(Base Project Allocation - $3,000,000)

 

14(Design & Contingencies - $600,000)

 

15(xxix) Ryerson Station State Park

 

<-16(A) Rehabilitate dam

 

17Project Allocation

5,000,000

18(Base Project Allocation - $5,000,000)

 

<-19(A) Rehabilitate dam

 

20Project Allocation

15,000,000

21(Base Project Allocation -
22$15,000,000)

 

23(B) Dredging of sediment in Duke Lake

 

24Project Allocation

7,800,000

25(Base Project Allocation - $6,500,000)

 

26(Design & Contingencies - $1,300,000)

 

27(xxx) Samuel S. Lewis State Park

 

28(A) Replace pit restroom with modern
29facilities, including onsite septic
30system

 

1Project Allocation

1,200,000

2(Base Project Allocation - $1,200,000)

 

3(xxxi) Shawnee State Park

 

4(A) Replace regional office to meet
5modern code requirements and increase
6efficiency

 

7Project Allocation

3,600,000

8(Base Project Allocation - $3,600,000)

 

9(xxxii) Shikellamy State Park

 

10(A) Replace dam bags that have reached
11their life expectancy

 

12Project Allocation

4,000,000

13(Base Project Allocation - $4,000,000)

 

14(xxxii.1) Susquehannock State Park

 

15(A) Rehabilitate entryway from township
16road to park overlook

 

17Project Allocation

360,000

18(Base Project Allocation - $300,000)

 

19(Design & Contingencies - $60,000)

 

20(xxxii.2) Tioga State Forest

 

21(A) Construction of new maintenance
22headquarters

 

23Project Allocation

3,600,000

24(Base Project Allocation - $3,000,000)

 

25(Design & Contingencies - $600,000)

 

26(xxxii.3) Tuscarora State Forest

<-

27(A) Additional funds for DGS 196-11,
28Gunter Valley Dam, including
29construction of new dam control tower,
30dam embankment and foundation

 

1rehabilitation and repair and
2improvements to site access roadway
3and appurtenances

 

4Project Allocation

10,000,000

5(Base Project Allocation -
6$10,000,000)

 

7(xxxii.3) Various lakes

<-

8(xxxii.4) Various lakes<-

 

9(A) Dredging of various lakes throughout
10this Commonwealth and removing
11sediment

 

12Project Allocation

3,295,000

13(Base Project Allocation - $2,746,000)

 

14(Design & Contingencies - $549,000)

 

15(xxxiii) Tobyhanna State Park

 

16(A) Rehabilitate Tobyhanna No. 2 dam

 

17Project Allocation

8,500,000

18(Base Project Allocation - $7,000,000)

 

19(Design & Contingencies - $1,500,000)

 

20(xxxiv) Whipple Dam State Park

 

21(A) Replace bathhouse with modern
22facility and add onsite septic system

 

23Project Allocation

1,800,000

24(Base Project Allocation - $1,800,000)

 

25(xxxv) Various Parks and Forest Districts

 

26(A) Rehabilitate or replace lookout fire
27towers throughout park system

 

28Project Allocation

6,000,000

29(Base Project Allocation - $4,800,000)

 

30(Design & Contingencies - $1,200,000)

 

1(3) Department of Corrections

 

2(i) Elizabethtown Training Academy

 

3(A) Replace domestic and fire water lines
4and add fire hydrants

 

5Project Allocation

500,000

6(Base Project Allocation - $400,000)

 

7(Design & Contingencies - $100,000)

 

8(B) Renovate boiler plant, including
9boilers and associated equipment

 

10Project Allocation

3,125,000

11(Base Project Allocation - $2,500,000)

 

12(Design & Contingencies - $625,000)

 

13(C) Replace current fire alarm system

 

14Project Allocation

450,000

15(Base Project Allocation - $360,000)

 

16(Design & Contingencies - $90,000)

 

17(i.1) State Correctional Institution at
18Albion

 

19(A) Replace various roofs throughout
20institution

 

21Project Allocation

1,200,000

22(Base Project Allocation - $960,000)

 

23(Design & Contingencies - $240,000)

 

24(B) Replace fire alarm system throughout
25institution

 

26Project Allocation

900,000

27(Base Project Allocation - $720,000)

 

28(Design & Contingencies - $180,000)

 

29(ii) State Correctional Institution at
30Cambridge Springs

 

1(A) Replace 5,260 feet of current
2perimeter security system, which is
3obsolete and no longer supported by
4the manufacturer

 

5Project Allocation

1,200,000

6(Base Project Allocation - $960,000)

 

7(Design & Contingencies - $240,000)

 

8(B) Install perimeter lights around
9circumference of institution

 

10Project Allocation

1,565,000

11(Base Project Allocation - $1,252,000)

 

12(Design & Contingencies - $313,000)

 

13(iii) State Correctional Institution at Camp
14Hill

 

<-15(A) Renovate boiler plant to repair or
16replace worn out equipment, modify
17pollution controls system and utilize
18most effective fuel source

 

<-19(A) Renovate boiler plant to repair or
20replace worn out equipment and modify
21pollution controls system

 

22Project Allocation

4,000,000

23(Base Project Allocation - $3,200,000)

 

24(Design & Contingencies - $800,000)

 

25(B) Renovate kitchen No. 2

 

26Project Allocation

12,500,000

27(Base Project Allocation -
28$10,000,000)

 

29(Design & Contingencies - $2,500,000)

 

30(C) Demolish housing units A, B, C and D

 

1and construct four new housing units

 

2Project Allocation

81,000,000

3(Base Project Allocation -
4$64,800,000)

 

5(Design & Contingencies - $16,200,000)

 

6(iv) State Correctional Institution at
7Chester

 

8(A) Replace various roofs throughout
9institution

 

10Project Allocation

7,000,000

11(Base Project Allocation - $5,600,000)

 

12(Design & Contingencies - $1,400,000)

 

13(v) State Correctional Institution at Coal

 

14(A) Replace rubber roofing on all inmate
15housing units

 

16Project Allocation

3,500,000

17(Base Project Allocation - $2,800,000)

 

18(Design & Contingencies - $700,000)

 

19(vi) State Correctional Institution at Dallas

 

20(A) Expand existing visiting room with
21approximately 2,000-square-foot
22addition to handle increased
23visitation demands

 

24Project Allocation

400,000

25(Base Project Allocation - $320,000)

 

26(Design & Contingencies - $80,000)

 

27(B) Additional funding to upgrade storm
28and sewage plant project 578-24

 

29Project Allocation

4,000,000

30(Base Project Allocation - $3,200,000)

 

1(Design & Contingencies - $800,000)

 

2(vii) State Correctional Institution at
3Fayette

 

4(A) Upgrade security system, including
5door control, intercom, public address
6and perimeter security head unit for
7the institution

 

8Project Allocation

1,300,000

9(Base Project Allocation - $1,040,000)

 

10(Design & Contingencies - $260,000)

 

11(viii) State Correctional Institution at
12Forest

 

13(A) Replace 5,300 feet of current
14perimeter security system which is
15obsolete and no longer supported by
16the manufacturer

 

17Project Allocation

1,430,000

18(Base Project Allocation - $1,144,000)

 

19(Design & Contingencies - $286,000)

 

20(B) Repair or replace the HTHW (High
21Temperature Hot Water) piping
22distribution system.

 

23Project Allocation

4,000,000

24(Base Project Allocation - $3,200,000)

 

25(Design & Contingencies - $800,000)

 

26(C) Upgrade or replace institution's
27intercom system

 

28Project Allocation

700,000

29(Base Project Allocation - $560,000)

 

30(Design & Contingencies - $140,000)

 

1(ix) State Correctional Institution at
2Graterford

 

3(A) Replace 5,300 feet of current
4perimeter security system which is
5obsolete and no longer supported by
6the manufacturer

 

7Project Allocation

1,200,000

8(Base Project Allocation - $960,000)

 

9(Design & Contingencies - $240,000)

 

10(B) Remove and replace EPDM roofing and
11drain system on Correctional
12Industries and maintenance buildings

 

13Project Allocation

1,375,000

14(Base Project Allocation - $1,100,000)

 

15(Design & Contingencies - $275,000)

 

16(x) State Correctional Institution at
17Greensburg

 

18(A) Replace 4,224 feet of current
19perimeter security system which is
20obsolete and no longer supported by
21the manufacturer

 

22Project Allocation

750,000

23(Base Project Allocation - $600,000)

 

24(Design & Contingencies - $150,000)

 

25(xi) State Correctional Institution at
26Houtzdale

 

27(A) Replace current microwave security
28system with a buried coaxial system

 

29Project Allocation

1,020,000

30(Base Project Allocation - $816,000)

 

1(Design & Contingencies - $204,000)

 

2(B) Renovate boiler plant equipment,
3modify pollution controls systems and
4utilize most cost-effective fuel
5source available

 

6Project Allocation

2,250,000

7(Base Project Allocation - $1,800,000)

 

8(Design & Contingencies - $450,000)

 

9(xii) State Correctional Institution at
10Huntingdon

 

11(A) Replace electrical services to blocks
12and cells to meet current power demand
13requirements

 

14Project Allocation

8,500,000

15(Base Project Allocation - $6,800,000)

 

16(Design & Contingencies - $1,700,000)

 

17(xiii) State Correctional Institution at
18Laurel Highlands

 

19(A) Replace perimeter security detection
20system, including taut wire system on
21perimeter fence, and add new razor
22wire

 

23Project Allocation

2,500,000

24(Base Project Allocation - $2,000,000)

 

25(Design & Contingencies - $500,000)

 

26(xiv) State Correctional Institution at
27Mahanoy

 

28(A) Repair deteriorated face block on
29inmate housing units and repair
30infrastructure

 

1Project Allocation

15,000,000

2(Base Project Allocation -
3$12,000,000)

 

4(Design & Contingencies - $3,000,000)

 

5(B) Replace rubber roofing and metal
6roofing on all inmate housing units

 

7Project Allocation

3,800,000

8(Base Project Allocation - $3,040,000)

 

9(Design & Contingencies - $760,000)

 

10(C) Replace personal alarm system
11throughout institution

 

12Project Allocation

425,000

13(Base Project Allocation - $340,000)

 

14(Design & Contingencies - $85,000)

 

15(D) Replace block walls surrounding Level
165 housing unit exercise yard pens
17which have deteriorated from normal
18settling of structures

 

19Project Allocation

500,000

20(Base Project Allocation - $400,000)

 

21(Design & Contingencies - $100,000)

 

22(E) Expand parking and repave access
23roads and parking lots

 

24Project Allocation

800,000

25(Base Project Allocation - $640,000)

 

26(Design & Contingencies - $160,000)

 

27(xv) State Correctional Institution at Mercer

 

28(A) Replace rubber roofing on all inmate
29housing units

 

30Project Allocation

750,000

1(Base Project Allocation - $600,000)

 

2(Design & Contingencies - $150,000)

 

3(B) Repave existing perimeter road and
4install new perimeter road along new
5perimeter fence path

 

6Project Allocation

458,000

7(Base Project Allocation - $366,000)

 

8(Design & Contingencies - $92,000)

 

9(C) Replace cell doors on A, F and M
10blocks

 

11Project Allocation

1,600,000

12(Base Project Allocation - $1,280,000)

 

13(Design & Contingencies - $320,000)

 

14(D) Upgrade electrical panels, switches
15and breakers throughout facility

 

16Project Allocation

600,000

17(Base Project Allocation - $480,000)

 

18(Design & Contingencies - $120,000)

 

19(xvi) State Correctional Institution at Muncy

 

20(A) Install new 1,000,000-gallon water
21tower and install new water line for
22municipal water service tie-in

 

23Project Allocation

3,000,000

24(Base Project Allocation - $2,400,000)

 

25(Design & Contingencies - $600,000)

 

26(B) Expand existing visiting room with
27approximately 15,000-square-foot
28addition to handle increased
29visitation demands

 

30Project Allocation

5,300,000

1(Base Project Allocation - $4,240,000)

 

2(Design & Contingencies - $1,060,000)

 

3(C) Replace 6,340 feet of current
4perimeter security system which is
5obsolete and no longer supported by
6the manufacturer

 

7Project Allocation

1,430,000

8(Base Project Allocation - $1,144,000)

 

9(Design & Contingencies - $286,000)

 

10(D) Replace existing sewer lines which
11are obsolete and causing ground water
12infiltration

 

13Project Allocation

1,875,000

14(Base Project Allocation - $1,500,000)

 

15(Design & Contingencies - $375,000)

 

16(E) Construct new admissions building and
17demolish current building

 

18Project Allocation

625,000

19(Base Project Allocation - $500,000)

 

20(Design & Contingencies - $125,000)

 

21(F) Expand parking lot and repave access
22roads and parking lots

 

23Project Allocation

1,800,000

24(Base Project Allocation - $1,440,000)

 

25(Design & Contingencies - $360,000)

 

26(G) Replace existing modular housing unit
27to make ADA compliant

 

28Project Allocation

1,250,000

29(Base Project Allocation - $1,000,000)

 

30(Design & Contingencies - $250,000)

 

1(H) Construct new treatment center

 

2Project Allocation

3,125,000

3(Base Project Allocation - $2,500,000)

 

4(Design & Contingencies - $625,000)

 

5(I) Renovate housing units, including ADA
6improvements, electrical upgrades and
7HVAC systems and replace windows and
8doors

 

9Project Allocation

12,500,000

10(Base Project Allocation -
11$10,000,000)

 

12(Design & Contingencies - $2,500,000)

 

13(xvii) State Correctional Institution at Pine
14Grove

 

15(A) Replace 5,310 feet of current
16perimeter security system which is
17obsolete and no longer supported by
18the manufacturer

 

19Project Allocation

2,000,000

20(Base Project Allocation - $1,600,000)

 

21(Design & Contingencies - $400,000)

 

22(B) Expand and renovate main control room

 

23Project Allocation

680,000

24(Base Project Allocation - $544,000)

 

25(Design & Contingencies - $136,000)

 

26(xviii) State Correctional Institution at
27Pittsburgh

 

28(A) Replace 5,520 feet of current
29perimeter security system which is
30obsolete and no longer supported by

 

1the manufacturer

 

2Project Allocation

1,200,000

3(Base Project Allocation - $960,000)

 

4(Design & Contingencies - $240,000)

 

5(B) Replace leaking steam and condensate
6piping from power plant to A & B
7housing units

 

8Project Allocation

565,000

9(Base Project Allocation - $452,000)

 

10(Design & Contingencies - $113,000)

 

11(xix) State Correctional Institution at
12Rockview

 

13(A) Replace and add fencing to front of
14institution

 

15Project Allocation

2,400,000

16(Base Project Allocation - $1,920,000)

 

17(Design & Contingencies - $480,000)

 

18(B) Replace existing water tank at
19institution

 

20Project Allocation

1,440,000

21(Base Project Allocation - $1,152,000)

 

22(Design & Contingencies - $288,000)

 

23(C) Replace windows in treatment building

 

24Project Allocation

2,400,000

25(Base Project Allocation - $1,920,000)

 

26(Design & Contingencies - $480,000)

 

27(D) Additional funds for DGS Project 571-
2830, upgrade reservoir to meet dam
29safety regulations

 

30Project Allocation

3,518,000

1(Base Project Allocation - $2,814,000)

 

2(Design & Contingencies - $704,000)

 

3(E) Renovate boiler plant ash handling
4system to meet current regulations

 

5Project Allocation

625,000

6(Base Project Allocation - $500,000)

 

7(Design & Contingencies - $125,000)

 

8(F) Renovate exterior of main dining hall
9and auditorium building, including
10refacing and repairing of concrete and
11sealing building

 

12Project Allocation

2,000,000

13(Base Project Allocation - $1,600,000)

 

14(Design & Contingencies - $400,000)

 

15(G) Renovate exterior of deputy warden's
16building, including refacing and
17repairing of concrete and sealing
18building

 

19Project Allocation

1,000,000

20(Base Project Allocation - $800,000)

 

21(Design & Contingencies - $200,000)

 

22(H) Expand parking and repave access
23roads and parking lots

 

24Project Allocation

800,000

25(Base Project Allocation - $640,000)

 

26(Design & Contingencies - $160,000)

 

27(xx) State Correctional Institution at
28Smithfield

 

29(A) Renovate boilers and equipment,
30modify pollution controls and provide

 

1effective fuel source

 

2Project Allocation

3,500,000

3(Base Project Allocation - $2,800,000)

 

4(Design & Contingencies - $700,000)

 

5(xxi) State Correctional Institution at
6Somerset

 

7(A) Renovate 480-volt distribution
8switchgear and replace obsolete
9circuit breakers

 

10Project Allocation

432,000

11(Base Project Allocation - $346,000)

 

12(Design & Contingencies - $86,000)

 

13(B) Replace existing digital management
14system panels throughout institution

 

15Project Allocation

420,000

16(Base Project Allocation - $336,000)

 

17(Design & Contingencies - $84,000)

 

18(C) Replace roof on Correctional
19Industries Laundry Building

 

20Project Allocation

910,000

21(Base Project Allocation - $728,000)

 

22(Design & Contingencies - $182,000)

 

23(D) Replace proximity card access system
24throughout institution for door
25control

 

26Project Allocation

625,000

27(Base Project Allocation - $500,000)

 

28(Design & Contingencies - $125,000)

 

29(E) Replace rooftop heating and cooling
30units on inmate housing

 

1Project Allocation

775,000

2(Base Project Allocation - $620,000)

 

3(Design & Contingencies - $155,000)

 

4(F) Install new water pump within
5facility

 

6Project Allocation

500,000

7(Base Project Allocation - $500,000)

 

8(xxii) State Correctional Institution at
9Waymart

 

10(A) Repoint exterior building masonry and
11repair parapets and brick work
12throughout institution

 

13Project Allocation

3,420,000

14(Base Project Allocation - $2,736,000)

 

15(Design & Contingencies - $684,000)

 

16(B) Demolish J-Ward and repair corridor
17and roof structure at current building
18tie-in point

 

19Project Allocation

840,000

20(Base Project Allocation - $672,000)

 

21(Design & Contingencies - $168,000)

 

22(C) Renovate and expand existing dining
23room to satisfy current needs

 

24Project Allocation

3,300,000

25(Base Project Allocation - $2,640,000)

 

26(Design & Contingencies - $660,000)

 

27(D) Construct a new education building

 

28Project Allocation

4,600,000

29(Base Project Allocation - $3,680,000)

 

30(Design & Contingencies - $920,000)

 

1(E) Expand parking and repave access
2roads and parking lots

 

3Project Allocation

1,750,000

4(Base Project Allocation - $1,400,000)

 

5(Design & Contingencies - $350,000)

 

6(F) Additional funding to renovate boiler
7plant project No. 1578-7

 

8Project Allocation

4,260,000

9(Base Project Allocation - $3,408,000)

 

10(Design & Contingencies - $852,000)

 

11(G) Renovate and expand A block housing
12unit

 

13Project Allocation

2,500,000

14(Base Project Allocation - $2,000,000)

 

15(Design & Contingencies - $500,000)

 

16(xxiii) State Correctional Institutions
17Statewide

 

18(A) Replace door control systems and
19central control, housing units and
20other buildings

 

21Project Allocation

9,000,000

22(Base Project Allocation - $7,200,000)

 

23(Design & Contingencies - $1,800,000)

 

24(4) Department of Education

 

25(i) Department of Education Headquarters

 

26(A) Renovate two floors of Department of
27Education headquarters building at 333
28Market Street, Harrisburg

 

29Project Allocation

1,000,000

30(Base Project Allocation - $1,000,000)

 

1(ii) Delaware County Community College

 

2(A) Construction, infrastructure and
3other related costs for renovation of
4the existing Technical High School
5Pickering Campus

 

6Project Allocation

2,400,000

7(Base Project Allocation - $2,000,000)

 

8(Design & Contingencies - $400,000)

 

9(iii) Lehigh Carbon Community College

 

10(A) Site development, infrastructure,
11redevelopment, construction and other
12costs related to construction of an
13educational facility in Carbon County

 

14Project Allocation

4,800,000

15(Base Project Allocation - $4,000,000)

 

16(Design & Contingencies - $800,000)

 

17(iv) Lincoln University

 

18(A) Additional funds for DGS Project No.
191101-46, construction of additional
20tennis courts, softball field, soccer
21field and bleachers to support track
22and soccer fields

 

23Project Allocation

20,000,000

24(Base Project Allocation -
25$16,000,000)

 

26(Design & Contingencies - $4,000,000)

 

27(B) Provide for new construction and
28renovation of three existing
29facilities to create the Center for
30the Study of Black Culture at the

 

1university

 

2Project Allocation

25,000,000

3(Base Project Allocation -
4$20,000,000)

 

5(Design & Contingencies - $5,000,000)

 

6(C) Renovate and expand Alumni House

 

7Project Allocation

20,000,000

8(Base Project Allocation -
9$16,000,000)

 

10(Design & Contingencies - $4,000,000)

 

11(v) Pennsylvania Highlands Community College

 

12(A) Acquisition, construction,
13rehabilitation and other costs related
14to the design and construction of
15facilities to be utilized as a branch
16campus to be located in Mifflin County

 

17Project Allocation

600,000

18(Base Project Allocation - $500,000)

 

19(Design & Contingencies - $100,000)

 

20(vi) Community College of Philadelphia

 

21(A) Renovation of biology labs and
22associated prep rooms at main campus
23and West Regional Center

 

24Project Allocation

4,800,000

25(Base Project Allocation - $4,000,000)

 

26(Design & Contingencies - $800,000)

 

27(vi.1) Reading Area Community College

 

28(A) Construction, infrastructure
29improvements and related costs for the
30Reading Area Community College Berks

 

1Hall renovation and conservation
2project

 

3Project Allocation

1,167,000

4(Base Project Allocation - $1,167,000)

 

5(B) Construction, infrastructure
6improvements and related costs for the
7Reading Area Community College
8pedestrian safety, gateway and traffic
9improvement project

 

10Project Allocation

2,356,000

11(Base Project Allocation - $2,356,000)

 

12(vii) Temple University

 

<-13(A) Renovate and modernize existing
14entrance to Tomlinson Hall

 

15Project Allocation

4,500,000

16(Base Project Allocation - $3,600,000)

 

17(Design & Contingencies - $900,000)

 

18(B) Renovate and construct an addition to
19Gladfelter Hall to house a Center for
20Scholars

 

21Project Allocation

2,700,000

22(Base Project Allocation - $2,400,000)

 

23(Design & Contingencies - $300,000)

 

<-24(A) (Reserved)

 

25(B) (Reserved)

 

26(C) Renovate Paley Library

 

27Project Allocation

90,000,000

28(Base Project Allocation -
29$90,000,000)

 

30(D) Renovate Old Dental School

 

1Project Allocation

75,000,000

2(Base Project Allocation -
3$75,000,000)

 

4(E) Renovate and expand law school

 

5Project Allocation

60,000,000

6(Base Project Allocation -
7$60,000,000)

 

8(F) Renovate and construct addition to
9College of Engineering

 

10Project Allocation

100,000,000

11(Base Project Allocation -
12$100,000,000)

 

13(G) Demolition of Barton Hall and
14construct campus quad, Main Campus

 

15Project Allocation

10,000,000

16(Base Project Allocation -
17$10,000,000)

 

18(H) Reface and renovate Health Sciences
19Campus

 

20Project Allocation

35,000,000

21(Base Project Allocation -
22$35,000,000)

 

23(I) Acquisition, infrastructure,
24renovations, construction and other
25related costs to support a dental,
26medical, health sciences and patient
27care facilities project in Lackawanna
28County

 

29Project Allocation

20,000,000

30(Base Project Allocation -

 

1$20,000,000)

 

<-2(J) Construction, infrastructure and
3other related costs for development of
4a multiuse facility for athletics,
5academics and research and local
6community athletic events

 

7Project Allocation

130,000,000

8(Base Project Allocation -
9$130,000,000)

 

10(viii) Thaddeus Stevens College of Technology

 

11(A) Upgrade and rehabilitate college's
12main electrical system, including
13infrastructure

 

14Project Allocation

3,000,000

15(Base Project Allocation - $2,400,000)

 

16(Design & Contingencies - $600,000)

 

17(B) Expand dining hall by adding second
18story which will connect into Hartzell
19Instructional Center

 

20Project Allocation

5,750,000

21(Base Project Allocation - $5,060,000)

 

22(Design & Contingencies - $690,000)

 

23(C) Infrastructure, development, design
24and other costs related to demolition
25of Leonard Building and construction
26of technology center

 

27Project Allocation

16,800,000

28(Base Project Allocation -
29$14,000,000)

 

30(Design & Contingencies - $2,800,000)

 

1(D) Renovate Mellor Classroom and
2Administrative Building

 

3Project Allocation

1,017,000

4(Base Project Allocation - $895,000)

 

5(Design & Contingencies - $122,000)

 

6(E) Upgrade electrical system campus-wide

 

7Project Allocation

2,875,000

8(Base Project Allocation - $2,530,000)

 

9(Design & Contingencies - $345,000)

 

10(F) Renovate Learning Resource Center to
11meet modern codes, including ADA and
12HVAC

 

13Project Allocation

2,300,000

14(Base Project Allocation - $2,018,000)

 

15(Design & Contingencies - $282,000)

 

16(G) Upgrade HVAC, including controls in
17three main buildings and two auxiliary
18buildings

 

19Project Allocation

400,000

20(Base Project Allocation - $352,000)

 

21(Design & Contingencies - $48,000)

 

22(H) Renovate metal fabrication and
23welding shop, including new exhaust
24system and welding stations

 

25Project Allocation

250,000

26(Base Project Allocation - $220,000)

 

27(Design & Contingencies - $30,000)

 

28(I) Abatement of lead paint and painting
29of two campus buildings

 

30Project Allocation

230,000

1(Base Project Allocation - $202,000)

 

2(Design & Contingencies - $28,000)

 

3(J) Renovate Hartzell Hall to include a
4second floor with additional classroom
5and office space

 

6Project Allocation

5,000,000

7(Base Project Allocation - $4,400,000)

 

8(Design & Contingencies - $600,000)

 

9(K) Upgrade IT distribution, including
10electrical wiring throughout campus

 

11Project Allocation

5,000,000

12(Base Project Allocation - $4,400,000)

 

13(Design & Contingencies - $600,000)

 

14(ix) The Pennsylvania State University

 

15(A) Convert existing coal-fired boilers
16to natural gas to comply with new
17EPA/DEP clean air regulations

 

18Project Allocation

25,000,000

19(Base Project Allocation -
20$20,000,000)

 

21(Design & Contingencies - $5,000,000)

 

22(B) Provide for continuation of capital
23to renovate campuses located in
24university's eastern region

 

25Project Allocation

28,000,000

26(Base Project Allocation -
27$28,000,000)

 

28(C) Design, infrastructure, construction,
29renovations, abatement of hazardous
30materials, utility upgrades and

 

1extensions and other related costs for
2state-of-the-art research and teaching
3space for College of Liberal Arts

 

4Project Allocation

54,000,000

5(Base Project Allocation -
6$43,200,000)

 

7(Design & Contingencies - $10,800,000)

 

8(D) Design, infrastructure, renovations,
9abatement of hazardous materials and
10other related costs for building
11access modifications, including
12installation of key access boxes and
13video surveillance cameras and
14infrastructure and any building
15modifications needed

 

16Project Allocation

10,000,000

17(Base Project Allocation - $8,000,000)

 

18(Design & Contingencies - $2,000,000)

 

19(E) Design, infrastructure, construction,
20renovations, abatement of hazardous
21materials, underground piping upgrades
22and additions and other related costs
23for a chilled water capacity and
24distribution expansion project at
25University Park campus

 

26Project Allocation

25,000,000

27(Base Project Allocation -
28$20,000,000)

 

29(Design & Contingencies - $5,000,000)

 

30(F) Design, infrastructure, construction,

 

1abatement of hazardous materials,
2utility upgrades and extensions and
3other related costs for new
4classroom/class lab building at
5University Park campus

 

6Project Allocation

51,300,000

7(Base Project Allocation -
8$41,040,000)

 

9(Design & Contingencies - $10,260,000)

 

10(G) Additional funding for renovations,
11rehabilitation, construction and other
12costs related to an addition to
13existing computer building or
14construction of new facility

 

15Project Allocation

10,000,000

16(Base Project Allocation -
17$10,000,000)

 

18(H) Design, acquisition, infrastructure,
19demolition, construction, abatement of
20hazardous materials, utility upgrades
21and extensions, and other related
22costs for a general computing Tier II<-I
23data center

 

24Project Allocation

50,000,000

25(Base Project Allocation -
26$40,000,000)

 

27(Design & Contingencies - $10,000,000)

 

28(I) Additional funding for renovations to
29Henning Building, including upgrades
30to systems to bring them to current

 

1facility standards

 

2Project Allocation

15,000,000

3(Base Project Allocation -
4$15,000,000)

 

5(J) Infrastructure, renovations,
6construction, abatement of hazardous
7materials, utility upgrades and
8extensions and other related costs for
9the rehabilitation of Kostos Building

 

10Project Allocation

12,000,000

11(Base Project Allocation - $9,600,000)

 

12(Design & Contingencies - $2,400,000)

 

13(K) Design, infrastructure, construction,
14abatement of hazardous materials,
15utility upgrades and extensions and
16other related costs for a capital
17renewal project to Baker Engineering
18and Science Building

 

19Project Allocation

8,000,000

20(Base Project Allocation - $6,400,000)

 

21(Design & Contingencies - $1,600,000)

 

22(L) Design, infrastructure, construction,
23abatement of hazardous materials,
24utility upgrades and extensions and
25other related costs for new Recital
26Hall addition and Music I renovations

 

27Project Allocation

25,000,000

28(Base Project Allocation -
29$20,000,000)

 

30(Design & Contingencies - $5,000,000)

 

1(M) Design, infrastructure, construction,
2abatement of hazardous materials,
3utility upgrades and extensions and
4other related costs for a capital
5renewal project to Ruhl
6Student/Community Center and the
7attached multipurpose building

 

8Project Allocation

10,500,000

9(Base Project Allocation - $8,400,000)

 

10(Design & Contingencies - $2,100,000)

 

11(N) Design, infrastructure, construction,
12abatement of hazardous materials,
13utility extensions and other related
14costs for Student Union building at
15Brandywine

 

16Project Allocation

16,000,000

17(Base Project Allocation -
18$12,800,000)

 

19(Design & Contingencies - $3,200,000)

 

20(O) Design, infrastructure, construction,
21abatement of hazardous materials, and
22other related costs for capital
23renewal project to waste water
24treatment plant at University Park
25campus

 

26Project Allocation

45,000,000

27(Base Project Allocation -
28$36,000,000)

 

29(Design & Contingencies - $9,000,000)

 

30(P) Additional funding for

 

1infrastructure, construction and other
2related costs for construction of
3water treatment facility and
4distribution system at University Park

 

5Project Allocation

15,000,000

6(Base Project Allocation -
7$15,000,000)

 

8(Q) Design, infrastructure, construction,
9abatement of hazardous materials, and
10other related costs for athletic field
11conversion and expansion project at
12Pennsylvania College of Technology

 

13Project Allocation

1,200,000

14(Base Project Allocation - $1,000,000)

 

15(Design & Contingencies - $200,000)

 

16(R) Design, infrastructure, construction
17and other related costs for career and
18alumni center at Pennsylvania College
19of Technology

 

20Project Allocation

13,200,000

21(Base Project Allocation -
22$11,000,000)

 

23(Design & Contingencies - $2,200,000)

 

24(S) Design, infrastructure, construction
25and other related costs for athletic,
26fitness and wellness center at
27Pennsylvania College of Technology

 

28Project Allocation

30,000,000

29(Base Project Allocation -
30$25,000,000)

 

1(Design & Contingencies - $5,000,000)

 

2(T) Design, infrastructure, construction,
3abatement of hazardous materials and
4other related costs, including utility
5upgrades and extensions, site
6improvements and code-related upgrades
7for multiphased development of Pattee
8Library Knowledge Commons at
9University Park

 

10Project Allocation

11,000,000

11(Base Project Allocation - $8,800,000)

 

12(Design & Contingencies - $2,200,000)

 

13(U) Construct new data center at Milton
14S. Hershey Medical Center

 

15Project Allocation

24,000,000

16(Base Project Allocation -
17$24,000,000)

 

<-18(V) Design, infrastructure, construction,
19demolition, renovations, abatement of
20hazardous materials, utility upgrades
21and extensions and other related costs
22for state-of-the-art research and
23teaching space for College of
24Engineering

 

25Project Allocation

100,000,000

26(Base Project Allocation -
27$80,000,000)

 

28(Design & Contingencies - $20,000,000)

 

<-29(W) Original furniture and equipment for
30state-of-the-art research and teaching

 

1space for College of Engineering

 

2Project Allocation

15,000,000

3(Base Project Allocation -
4$15,000,000)

 

5(X) Construction, infrastructure and
6other related costs for medical and
7educational facilities for Penn State
8Hershey Medical Center

 

9Project Allocation

50,000,000

10(Base Project Allocation -
11$50,000,000)

 

<-12(Y) Design, infrastructure, construction,
13demolition, renovations, abatement of
14hazardous materials, utility upgrades
15and extensions and other related costs
16for College of Agricultural Sciences.

 

17Project Allocation

80,000,000

18(Base Project Allocation -
19$64,000,000)

 

20(Design & Contingencies - $16,000,000)

 

<-21(Z) Design, infrastructure, construction,
22demolition, renovations, abatement of
23hazardous materials, utility upgrades
24and extensions and other related costs
25for state-of-the-art research and
26teaching space for College of
27Engineering

 

28Project Allocation

100,000,000

29(Base Project Allocation -
30$80,000,000)

 

1(Design & Contingencies - $20,000,000)

 

2(x) University of Pittsburgh

 

3(A) Renovate exterior of Hillman Library,
4including plaza, planters, windows,
5masonry and waterproofing membrane

 

6Project Allocation

10,000,000

7(Base Project Allocation - $8,000,000)

 

8(Design & Contingencies - $2,000,000)

 

9(B) Renovate Fitzgerald Fieldhouse to
10meet modern codes, including ADA, and
11expand building to meet demands

 

12Project Allocation

10,000,000

13(Base Project Allocation - $8,000,000)

 

14(Design & Contingencies - $2,000,000)

 

15(C) Renovate and construct addition to
16Trees Hall

 

17Project Allocation

40,000,000

18(Base Project Allocation -
19$40,000,000)

 

20(D) Renovate and construct addition to
21Fitzgerald Fieldhouse

 

22Project Allocation

20,000,000

23(Base Project Allocation -
24$20,000,000)

 

25(E) Renovate Bellefield Hall

 

26Project Allocation

15,000,000

27(Base Project Allocation -
28$15,000,000)

 

29(F) Renovate, construct addition and fit-
30out to Posvar Hall

 

1Project Allocation

30,000,000

2(Base Project Allocation -
3$30,000,000)

 

4(G) Renovation and addition to David
5Lawrence Hall

 

6Project Allocation

30,000,000

7(Base Project Allocation -
8$30,000,000)

 

9(H) Upgrade to Trees Field

 

10Project Allocation

20,000,000

11(Base Project Allocation -
12$20,000,000)

 

13(I) Upgrade and deferred maintenance --
14Phase VII

 

15Project Allocation

20,000,000

16(Base Project Allocation -
17$20,000,000)

 

18(J) Programmatic renovations - Phase III

 

19Project Allocation

20,000,000

20(Base Project Allocation -
21$20,000,000)

 

22(5) Department of Environmental Protection

 

23(i) Allegheny County

 

24(A) Acquisition, construction, 
25infrastructure and other related costs 
26for aviation, industrial and 
27commercial site development and 
28improvements, including flood 
29mitigation and structural 
30improvements, at or surrounding
 

 

1Allegheny County Airport

 

2Project Allocation

40,000,000

3(Base Project Allocation -
4$40,000,000)

 

5(B) Construction, infrastructure
6improvements and other costs related
7to the development of de-icing fluid
8treatment facility at Pittsburgh
9International Airport, including flood
10mitigation structural improvements

 

11Project Allocation

25,000,000

12(Base Project Allocation -
13$25,000,000)

 

14(C) Acquisition, construction,
15infrastructure and other related costs
16for the development of industrial and
17commercial sites at or surrounding
18Pittsburgh International Airport

 

19Project Allocation

50,000,000

20(Base Project Allocation -
21$50,000,000)

 

22(D) Acquisition, construction,
23infrastructure and other related costs
24for Pitcairn Borough Dirty Camp Run
25flood protection project

 

26Project Allocation

1,360,000

27(Base Project Allocation - $1,360,000)

 

28(ii) Cambria County

 

29(A) Additional funding for DGS Project
30183-19, flood protection project in

 

1Adams and Croyle Townships for south
2fork of Little Conemaugh River,
3including earthen levee repair and
4concrete channel rehabilitation

 

5Project Allocation

1,800,000

6(Base Project Allocation - $1,620,000)

 

7(Design & Contingencies - $180,000)

 

8(B) Rehabilitate existing flood
9protection in Northern Cambria
10Borough, including replacement of
11drainage structures, pedestrian ramp
12and mitigation

 

13Project Allocation

1,350,000

14(Base Project Allocation - $1,215,000)

 

15(Design & Contingencies - $135,000)

 

16(iii) Carbon County

 

17(A) Provide for complete rehabilitation
18of flood protection to bring existing
19flood protection to current standards
20in Weissport Borough

 

21Project Allocation

3,750,000

22(Base Project Allocation - $3,000,000)

 

23(Design & Contingencies - $750,000)

 

24(iv) Clearfield County

 

25(A) Rehabilitate existing flood
26protection in Irvona Borough,
27including replacement of drainage
28structures, elimination of two closure
29structures and mitigation

 

30Project Allocation

1,800,000

1(Base Project Allocation - $1,620,000)

 

2(Design & Contingencies - $180,000)

 

3(v) Columbia County

 

4(A) Provide additional funds for flood
5protection project in Town of
6Bloomsburg currently being designed by
7Baltimore District to satisfy post-
8Hurricane Katrina Federal guidelines

 

9Project Allocation

10,000,000

10(Base Project Allocation -
11$10,000,000)

 

12(B) Provide for flood protection for the
13town of Bloomsburg, including
14watershed and channel improvements

 

15Project Allocation

70,000,000

16(Base Project Allocation -
17$59,500,000)

 

18(Design & Contingencies - $10,500,000)

 

19(vi) Dauphin County

 

20(A) Acquire and rehabilitate or construct
21south central regional office

 

22Project Allocation

22,750,000

23(Base Project Allocation -
24$20,475,000)

 

25(Design & Contingencies - $2,275,000)

 

26(vii) Lancaster County

 

27(A) Additional funding for DGS Project
28182-21, Marietta Borough flood
29protection project, including
30embankment, earthen levee, concrete

 

1wall closure and gates

 

2Project Allocation

20,700,000

3(Base Project Allocation -
4$18,630,000)

 

5(Design & Contingencies - $2,070,000)

 

6(viii) Lehigh County

 

7(A) Construction of a storm water
8retention system for flooding
9mitigation in Borough of Fountain Hill
10Mill 2 complex

 

11Project Allocation

1,000,000

12(Base Project Allocation - $1,000,000)

 

13(ix) Luzerne County

 

14(A) Repair or replace debris dam
15embankment and its inlet works on
16Brown Creek and replace damaged storm
17drains within Plymouth Borough

 

18Project Allocation

1,800,000

19(Base Project Allocation - $1,620,000)

 

20(Design & Contingencies - $180,000)

 

21(B) Additional funding for DGS Project
22183-3, stream bank stabilization in
23Pittston Township, including
24mitigation and maintenance on access
25ramps

 

26Project Allocation

1,350,000

27(Base Project Allocation - $1,215,000)

 

28(Design & Contingencies - $135,000)

 

29(x) Monroe County

 

30(A) Construction, infrastructure

 

1improvements and other costs related
2to Skytop Dam restoration

 

3Project Allocation

2,000,000

4(Base Project Allocation - $2,000,000)

 

5(xi) Montgomery County

 

6(A) Additional funding for DGS Project
7181-08, raising level of levees along
8Tacony Creek, construction of concrete
9channel, extension of culvert box and
10construction of new SEPTA railroad
11bridge for stream flow improvement in
12Cheltenham and Abington Townships

 

13Project Allocation

4,000,000

14(Base Project Allocation - $3,200,000)

 

15(Design & Contingencies - $800,000)

 

16(B) Additional funding for DGS Project
17181-17, Sandy Run flood protection
18project, in Abington and Upper Dublin
19Townships, including channel
20realignment and improvements,
21including mitigation

 

22Project Allocation

360,000

23(Base Project Allocation - $324,000)

 

24(Design & Contingencies - $36,000)

 

25(C) Additional funding for DGS Project
26181-8, raising level of levees along
27Tacony Creek, construction of concrete
28channel, extension of culvert box and
29construction of new SEPTA railroad
30bridge for stream flow improvement in

 

1Glenside area of Cheltenham Township,
2including raising of concrete channel
3wall and earthen levee and
4constructing concrete channel with
5culvert

 

6Project Allocation

1,800,000

7(Base Project Allocation - $1,620,000)

 

8(Design & Contingencies - $180,000)

 

9(D) Construction, infrastructure
10improvements and other costs related
11to Abington stream bank stabilization
12flood control project

 

13Project Allocation

200,000

14(Base Project Allocation - $200,000)

 

15(xii) Philadelphia County

 

16(A) Construction, infrastructure, storm
17water management and restoration of
18tidal wetland for Penn Treaty Park
19Phase I project

 

20Project Allocation

20,000,000

21(Base Project Allocation -
22$20,000,000)

 

23(B) Lake renovations and other costs
24related to Franklin Delano Roosevelt
25Park

 

26Project Allocation

20,000,000

27(Base Project Allocation -
28$20,000,000)

 

29(6) Department of General Services

 

30(i) Berks County

 

1(A) Upgrade and renovate two elevators in
2Reading State Office Building,
3including replacement of controller,
4car fixtures, corridor fixtures door
5operator, tracks/hangars and power
6unit

 

7Project Allocation

250,000

8(Base Project Allocation - $150,000)

 

9(Design & Contingencies - $100,000)

 

10(B) Completely renovate two elevators,
11including motors and remodeling, in
12Reading State Office Building

 

13Project Allocation

250,000

14(Base Project Allocation - $150,000)

 

15(Design & Contingencies - $100,000)

 

16(C) Replace coal boilers with more
17efficient system in Reading State
18Office Building

 

19Project Allocation

1,000,000

20(Base Project Allocation - $800,000)

 

21(Design & Contingencies - $200,000)

 

22(D) Upgrade security at Reading State
23Office Building

 

24Project Allocation

100,000

25(Base Project Allocation - $100,000)

 

26(i.1) Cambria County

 

27(A) Demolition, construction,
28infrastructure, abatement of hazardous
29materials and other costs related to
30the State Corrections Facility at SCI

 

1Cresson property reuse project

 

2Project Allocation

15,000,000

3(Base Project Allocation -
4$15,000,000)

 

5(ii) Dauphin County

 

6(A) Replace wiring in all lighting
7fixtures in Main Capitol Building

 

8Project Allocation

1,500,000

9(Base Project Allocation - $1,500,000)

 

10(B) Upgrade and renovate all existing
11elevators, including upgrading motors
12and remodeling cabs, in Finance
13Building

 

14Project Allocation

1,820,000

15(Base Project Allocation - $1,638,000)

 

16(Design & Contingencies - $182,000)

 

17(C) Upgrade and renovate all existing
18elevators, including upgrading motors
19and remodeling cabs, in Forum Building

 

20Project Allocation

1,820,000

21(Base Project Allocation - $1,638,000)

 

22(Design & Contingencies - $182,000)

 

23(D) Replace roof, including paver
24supports, roof membrane and roof and
25parapet material of Keystone Building

 

26Project Allocation

2,500,000

27(Base Project Allocation - $2,000,000)

 

28(Design & Contingencies - $500,000)

 

29(E) Replace parapet roof, including full
30removal of old roof and repair

 

1spalling, in Finance Building

 

2Project Allocation

700,000

3(Base Project Allocation - $600,000)

 

4(Design & Contingencies - $100,000)

 

5(F) Repair roof-interstice space between
6roof and ceiling and tie into control
7system in Main Capitol Building

 

8Project Allocation

1,000,000

9(Base Project Allocation - $900,000)

 

10(Design & Contingencies - $100,000)

 

11(G) Replace roof and windows in Matthew
12J. Ryan Office Building

 

13Project Allocation

550,000

14(Base Project Allocation - $500,000)

 

15(Design & Contingencies - $50,000)

 

16(H) Remove and replace architectural
17grade shingles, remove and replace BUR
18roofs with R-30 insulation and EPDM
19roofing and replace EPDM roof on
20windows, including insulation, in DGS
21Annex Complex, Administration Building

 

22Project Allocation

113,000

23(Base Project Allocation - $110,000)

 

24(Design & Contingencies - $3,000)

 

25(I) Install central air conditioning in
26Chapel Building of DGS Annex Complex

 

27Project Allocation

116,000

28(Base Project Allocation - $113,000)

 

29(Design & Contingencies - $3,000)

 

30(J) Repair or replace damaged sandstone

 

1headers along entryway of Archives
2Building

 

3Project Allocation

310,000

4(Base Project Allocation - $300,000)

 

5(Design & Contingencies - $10,000)

 

6(K) Reline cooling towers, including
7membrane for chillers, at Central
8Plant

 

9Project Allocation

1,500,000

10(Base Project Allocation - $1,500,000)

 

11(L) Construct ADA entrance in North
12Office Building

 

13Project Allocation

750,000

14(Base Project Allocation - $700,000)

 

15(Design & Contingencies - $50,000)

 

16(M) Repave or rebuild various annex
17cartways at DGS Annex Complex

 

18Project Allocation

681,000

19(Base Project Allocation - $681,000)

 

20(N) Replace moduline diffuser in East
21Wing Building

 

22Project Allocation

381,000

23(Base Project Allocation - $381,000)

 

24(O) Completely renovate elevators,
25including motors and remodeling, in
26Finance Building

 

27Project Allocation

910,000

28(Base Project Allocation - $700,000)

 

29(Design & Contingencies - $210,000)

 

30(P) Completely renovate elevators,

 

1including motors and remodeling, in
2Forum Building

 

3Project Allocation

910,000

4(Base Project Allocation - $700,000)

 

5(Design & Contingencies - $210,000)

 

6(Q) Repair or replace pavers within
7Keystone Building Plaza

 

8Project Allocation

2,000,000

9(Base Project Allocation - $1,500,000)

 

10(Design & Contingencies - $500,000)

 

11(R) Completely replace roof of Arsenal
12Building, including flashing and roof
13drains

 

14Project Allocation

700,000

15(Base Project Allocation - $600,000)

 

16(Design & Contingencies - $100,000)

 

17(S) Replace chiller that controls cooling
18system in 22nd and Forster Building

 

19Project Allocation

600,000

20(Base Project Allocation - $480,000)

 

21(Design & Contingencies - $120,000)

 

22(T) Replace moduline diffusers in Rachel
23Carson Building

 

24Project Allocation

1,000,000

25(Base Project Allocation - $800,000)

 

26(Design & Contingencies - $200,000)

 

27(U) Completely renovate all building
28restrooms in Health and Welfare
29Building

 

30Project Allocation

4,000,000

1(Base Project Allocation - $3,200,000)

 

2(Design & Contingencies - $800,000)

 

3(V) Completely renovate all building
4restrooms in Labor and Industry
5Building

 

6Project Allocation

8,000,000

7(Base Project Allocation - $6,400,000)

 

8(Design & Contingencies - $1,600,000)

 

9(W) Replace secondary switchgear in State
10Museum Building, including under floor
11feeders

 

12Project Allocation

2,500,000

13(Base Project Allocation - $2,000,000)

 

14(Design & Contingencies - $500,000)

 

15(X) Replace generator in Petry Building

 

16Project Allocation

500,000

17(Base Project Allocation - $400,000)

 

18(Design & Contingencies - $100,000)

 

<-19(Y) Replace security and fire detection
20systems at Northwest Office Building
21located on Forster Street

 

22Project Allocation

11,500,000

23(Base Project Allocation -
24$10,500,000)

 

25(Design & Contingencies - $1,000,000)

 

26(Z) Install replacement windows
27throughout Northwest Office Building
28located on Forster Street

 

29Project Allocation

1,000,000

30(Base Project Allocation - $900,000)

 

1(Design & Contingencies - $100,000)

 

2(AA) Repoint bad joints and install
3vertical expansion joints in exterior
4wall corners of Northwest Office
5Building located on Forster Street

 

6Project Allocation

1,000,000

7(Base Project Allocation - $900,000)

 

8(Design & Contingencies - $100,000)

 

<-9(BB) Upgrade security in Capitol Complex

 

<-10(BB) Upgrade security in State buildings
11and facilities within the City of
12Harrisburg and Susquehanna Township

 

<-13(Y) Upgrade security in State buildings
14and facilities within the City of
15Harrisburg and Susquehanna Township

 

16Project Allocation

5,800,000

17(Base Project Allocation - $5,800,000)

 

18(iii) Lackawanna County

 

19(A) Upgrade security at the Scranton
20State Office Building

 

21Project Allocation

100,000

22(Base Project Allocation - $100,000)

 

23(iv) Philadelphia County

 

24(A) Renovations and rehabilitation of
25Pennsylvania Convention Center
26Facilities

 

27Project Allocation

38,000,000

28(Base Project Allocation -
29$38,000,000)

 

30(6.1) Pennsylvania Emergency Management Agency

 

1(i) Eastern Area Office Building

 

2(A) Demolish and remediate old Eastern
3Area Office on grounds of Hamburg
4Center

 

5Project Allocation

1,000,000

6(Base Project Allocation - $900,000)

 

7(Design & Contingencies - $100,000)

 

8(7) Pennsylvania Historical and Museum
9Commission

 

<-10(i) Bowman's Hill Wildflower Preserve

 

11(A) Construction and other related costs
12for Bowman's Hill Wildflower Preserve
13visitor center

 

14Project Allocation

2,500,000

15(Base Project Allocation - $2,500,000)

 

16(i) <-(ii) Brandywine Battlefield Park

 

17(A) Acquisition, infrastructure,
18renovation, construction and other
19related costs for redevelopment and
20preservation of Welcome Center and
21other historic buildings and access
22improvements

 

23Project Allocation

7,200,000

24(Base Project Allocation - $6,000,000)

 

25(Design & Contingencies - $1,200,000)

 

26(ii) <-(iii) Daniel Boone Homestead

 

27(A) Restore Daniel Boone Homestead and
28other structures at site

 

29Project Allocation

3,600,000

30(Base Project Allocation - $3,000,000)

 

1(Design & Contingencies - $600,000)

 

2(iii) <-(iv) Eckley Miners' Village

 

3(A) Install fire protection system,
4including construction of water main
5to provide sufficient fire suppression
6to buildings

 

7Project Allocation

3,600,000

8(Base Project Allocation - $3,000,000)

 

9(Design & Contingencies - $600,000)

 

10(B) Provide for Phase IV of preservation
11and restoration of miners' houses,
12including structural and interior
13restoration, infrastructure and
14restoration of outbuildings

 

15Project Allocation

4,800,000

16(Base Project Allocation - $4,000,000)

 

17(Design & Contingencies - $800,000)

 

18(iv) <-(v) Erie Maritime Museum

 

19(A) Provide for replacement of portions
20of existing exhibits, selective
21exhibit component improvements, new
22energy-efficient exhibit lighting and
23installation of new exhibits

 

24Project Allocation

3,600,000

25(Base Project Allocation - $3,000,000)

 

26(Design & Contingencies - $600,000)

 

27(v) <-(vi) Landis Valley Village and Farm
28Museum

 

29(A) Replace underground sewage, water,
30electrical, phone, data and fire and

 

1security lines throughout site and
2upgrade HVAC system with new
3geothermal systems and other energy-
4saving equipment and features

 

5Project Allocation

9,000,000

6(Base Project Allocation - $7,500,000)

 

7(Design & Contingencies - $1,500,000)

 

8(B) Install fire protection system,
9including construction of water main
10to provide sufficient fire suppression
11to buildings

 

12Project Allocation

3,600,000

13(Base Project Allocation - $3,000,000)

 

14(Design & Contingencies - $600,000)

 

15(C) Provide site improvements, including
16preservation and restoration of
17interior and exterior of buildings

 

18Project Allocation

3,600,000

19(Base Project Allocation - $3,000,000)

 

20(Design & Contingencies - $600,000)

 

21(D) Design, fabricate and install new
22permanent exhibits for new visitor
23center

 

24Project Allocation

4,000,000

25(Base Project Allocation - $4,000,000)

 

26(vi) <-(vii) Old Economy Village

 

27(A) Rehabilitate exterior and structure
28of up to 18 buildings, including
29painting, roofing, moisture barriers,
30repair of structural members, masonry,

 

1gutters and drainage chimneys,
2electrical, wastewater systems, HVAC
3and water supply lines with
4archaeological investigations at site

 

5Project Allocation

3,000,000

6(Base Project Allocation - $2,500,000)

 

7(Design & Contingencies - $500,000)

 

8(vii) <-(viii) Pennsbury Manor

 

9(A) Install fire protection system,
10including construction of water main
11to provide sufficient fire suppression
12to buildings

 

13Project Allocation

2,400,000

14(Base Project Allocation - $2,000,000)

 

15(Design & Contingencies - $400,000)

 

16(viii) <-(ix) Pennsylvania Anthracite Heritage
17Museum

 

18(A) Install fire protection system,
19including bringing sufficient water to
20building and installation of new
21sprinklers and gas/chemical
22suppression system in collection area

 

23Project Allocation

960,000

24(Base Project Allocation - $800,000)

 

25(Design & Contingencies - $160,000)

 

26(ix) <-(x) Pennsylvania Lumber Museum

 

27(A) Provide for second phase of exhibits
28in main gallery, as well as outdoor
29site interpretive signage and exhibits

 

30Project Allocation

3,600,000

1(Base Project Allocation - $3,000,000)

 

2(Design & Contingencies - $600,000)

 

3(x) <-(xi) Railroad Museum of Pennsylvania

 

4(A) Install fire protection system,
5including construction of water main
6to provide sufficient fire suppression
7to buildings

 

8Project Allocation

1,200,000

9(Base Project Allocation - $1,000,000)

 

10(Design & Contingencies - $200,000)

 

11(x.1) <-(xii) Scranton Iron Furnaces

 

12(A) Restore and stabilize furnaces,
13including masonry, drainage, lighting,
14security, fencing and infrastructure

 

15Project Allocation

6,000,000

16(Base Project Allocation - $5,000,000)

 

17(Design & Contingencies - $1,000,000)

 

18(xi) <-(xiii) Washington Crossing Historic Park

 

19(A) Provide restoration and improvements
20to Bowman's Hill Tower and ancillary
21facilities

 

22Project Allocation

6,000,000

23(Base Project Allocation - $5,000,000)

 

24(Design & Contingencies - $1,000,000)

 

25(B) Install fire protection system,
26including construction of water main
27to provide sufficient fire suppression
28to buildings

 

29Project Allocation

2,400,000

30(Base Project Allocation - $2,000,000)

 

1(Design & Contingencies - $400,000)

 

2(8) Department of Labor and Industry

 

3(i) Labor and Industry Building, Harrisburg,
4Dauphin County

 

5(A) Replace two high voltage
6transformers, including infrastructure

 

7Project Allocation

5,000,000

8(Base Project Allocation - $4,500,000)

 

9(Design & Contingencies - $500,000)

 

10(9) Department of Military and Veterans Affairs

 

11(i) (Reserved)

 

12(ii) Coraopolis Readiness Center, Allegheny
13County

 

14(A) Rehabilitate Coraopolis Readiness
15Center, including assembly hall,
16classrooms, administrative offices,
17storage space, restrooms, locker rooms
18and mechanical rooms; upgrade building
19systems (HVAC, roofs, windows, doors);
20and repair façade and parking facility

 

21Project Allocation

1,500,000

22(Base Project Allocation - $1,250,000)

 

23(Design & Contingencies - $250,000)

 

<-24(iii) Pittsburgh Hunt Readiness Center,
25Allegheny County

 

26(A) Rehabilitate Pittsburgh Hunt
27Readiness Center, including assembly
28hall, classrooms, administrative
29offices, storage space, restrooms,
30locker rooms and mechanical rooms;

 

1upgrade building systems (HVAC, roofs,
2windows, doors); repair façade; expand
3parking; and construct unheated
4storage facility

 

5Project Allocation

4,500,000

6(Base Project Allocation - $4,000,000)

 

7(Design & Contingencies - $500,000)

 

<-8(iii) (Reserved)

 

9(iv) Pittsburgh Support Maintenance Shop,
10Allegheny County

 

11(A) Combine three field maintenance shops
12with 11,300 square feet of usable
13space and 2,250 square feet of
14unheated storage

 

15Project Allocation

1,440,000

16(Base Project Allocation - $1,200,000)

 

17(Design & Contingencies - $240,000)

 

18(v) Southwestern Veterans Center, Allegheny
19County

 

20(A) Renovate and repair Southwestern
21Veterans Center, including replacement
22of facility roof

 

23Project Allocation

3,125,000

24(Base Project Allocation - $2,500,000)

 

25(Design & Contingencies - $625,000)

 

26(B) Provide for renovation and general
27repairs of Southwestern Veterans
28Center, including life safety and
29regulatory deficiencies

 

30Project Allocation

8,125,000

1(Base Project Allocation - $7,313,000)

 

2(Design & Contingencies - $812,000)

 

3(vi) Ford City Readiness Center, Armstrong
4County

 

5(A) Rehabilitate Ford City Readiness
6Center, including assembly hall,
7classrooms, administrative offices,
8storage space, restrooms, locker rooms
9and mechanical rooms; upgrade building
10systems (HVAC, roofs, windows, doors);
11repair façade; expand parking; and
12construct unheated storage facility

 

13Project Allocation

3,000,000

14(Base Project Allocation - $2,500,000)

 

15(Design & Contingencies - $500,000)

 

16(vii) Hollidaysburg Readiness Center, Blair
17County

 

18(A) Rehabilitate Hollidaysburg Readiness
19Center, including assembly hall,
20classrooms, administrative offices,
21storage space, restrooms, locker rooms
22and mechanical rooms; upgrade building
23systems (HVAC, roofs, windows, doors);
24and repair façade and parking facility

 

25Project Allocation

2,800,000

26(Base Project Allocation - $2,400,000)

 

27(Design & Contingencies - $400,000)

 

28(viii) Hollidaysburg Veterans Home, Blair
29County

 

30(A) Provide for renovation and general

 

1repairs of Hollidaysburg Veterans
2Home, including upgrading community
3living center at Eisenhower Hall and
4constructing meal delivery systems at
5Arnold and Eisenhower Halls

 

6Project Allocation

1,325,000

7(Base Project Allocation - $1,060,000)

 

8(Design & Contingencies - $265,000)

 

9(B) Provide for renovation and general
10repairs of Hollidaysburg Veterans Home

 

11Project Allocation

6,325,000

12(Base Project Allocation - $5,693,000)

 

13(Design & Contingencies - $632,000)

 

14(ix) Butler Readiness Center, Butler County

 

15(A) Rehabilitate Butler Readiness Center,
16including assembly hall, classrooms,
17administrative offices, storage space,
18restrooms, locker rooms and mechanical
19rooms; upgrade building systems (HVAC,
20roofs, windows, doors); repair façade;
21expand parking; and construct unheated
22storage facility

 

23Project Allocation

3,800,000

24(Base Project Allocation - $3,300,000)

 

25(Design & Contingencies - $500,000)

 

26(x) Southeastern Veterans Center, Chester
27County

 

28(A) Provide for renovation and general
29repairs of Southeastern Veterans
30Center, including upgrades and

 

1renovations at Coates Hall and
2construction of new maintenance
3building

 

4Project Allocation

1,925,000

5(Base Project Allocation - $1,540,000)

 

6(Design & Contingencies - $385,000)

 

7(B) Provide for renovation and general
8repairs of Southeastern Veterans
9Center, including replacement of
10facility roof

 

11Project Allocation

9,925,000

12(Base Project Allocation - $8,933,000)

 

13(Design & Contingencies - $992,000)

 

14(xi) Spring City Armory, Chester County

 

15(A) Rehabilitate Spring City Armory to
16current standards, including assembly
17hall, classrooms, administrative
18offices, storage space, restrooms,
19locker rooms and mechanical rooms;
20upgrade building systems (HVAC, roofs,
21windows, doors); repair façade; expand
22parking; and construct unheated
23storage facility

 

24Project Allocation

3,600,000

25(Base Project Allocation - $3,000,000)

 

26(Design & Contingencies - $600,000)

 

27(xii) Spring City Readiness Center, Chester
28County

 

29(A) Rehabilitate Spring City Readiness
30Center, including assembly hall,

 

1classrooms, administrative offices,
2storage space, restrooms, locker rooms
3and mechanical rooms; upgrade building
4systems (HVAC, roofs, windows, doors);
5repair façade; expand parking; and
6construct unheated storage facility

 

7Project Allocation

3,600,000

8(Base Project Allocation - $3,000,000)

 

9(Design & Contingencies - $600,000)

 

10(xiii) Lock Haven Readiness Center, Clinton
11County

 

12(A) Rehabilitate Lock Haven Readiness
13Center, including assembly hall,
14classrooms, administrative offices,
15storage space, restrooms, locker rooms
16and mechanical rooms; upgrade building
17systems (HVAC, roofs, windows, doors);
18repair façade; expand parking; and
19construct unheated storage facility

 

20Project Allocation

3,000,000

21(Base Project Allocation - $2,500,000)

 

22(Design & Contingencies - $500,000)

 

23(xiv) Harrisburg Readiness Center, Dauphin
24County

 

25(A) Rehabilitate Harrisburg Readiness
26Center, including assembly hall,
27classrooms, administrative offices,
28storage space, restrooms, locker rooms
29and mechanical rooms; upgrade building
30systems (HVAC, roofs, windows, doors);

 

1repair façade; expand parking; and
2construct unheated storage facility

 

3Project Allocation

4,600,000

4(Base Project Allocation - $4,000,000)

 

5(Design & Contingencies - $600,000)

 

6(xiv.1) Harrisburg Maintenance Shop

 

7(A) Rehabilitate Harrisburg Field
8Maintenance Shop, including
9maintenance bays, classrooms,
10administrative offices, storage
11spaces, restrooms, locker rooms and
12mechanical rooms and upgrade building
13systems, including HVAC, roofs,
14windows and doors, repairs to the
15facade, expansion of parking and
16construction of unheated storage
17facility

 

18Project Allocation

3,500,000

19(Base Project Allocation - $3,000,000)

 

20(Design & Contingencies - $500,000)

 

21(xv) Pennsylvania Soldiers and Sailors Home,
22Erie County

 

23(A) Provide for renovation and general
24repairs of Pennsylvania Soldiers and
25Sailors Home, including life safety
26and regulatory deficiencies

 

27Project Allocation

13,400,000

28(Base Project Allocation -
29$12,060,000)

 

30(Design & Contingencies - $1,340,000)

 

1(xvi) Indiana Readiness Center, Indiana
2County

 

3(A) Rehabilitate Indiana Readiness
4Center, including assembly hall,
5classrooms, administrative offices,
6storage space, restrooms, locker rooms
7and mechanical rooms; upgrade building
8systems (HVAC, roofs, windows, doors);
9repair façade; expand parking; and
10construct unheated storage facility

 

11Project Allocation

3,200,000

12(Base Project Allocation - $2,700,000)

 

13(Design & Contingencies - $500,000)

 

14(xvii) Gino J. Merli Veterans Center,
15Lackawanna County

 

16(A) Provide for renovation and general
17repairs of Gino J. Merli Veterans
18Center, including life safety and
19regulatory deficiencies

 

20Project Allocation

9,895,000

21(Base Project Allocation - $8,906,000)

 

22(Design & Contingencies - $989,000)

 

23(xvii.1) Scranton Maintenance Shop,
24Lackawanna County

 

25(A) Rehabilitate maintenance shop,
26administrative offices, classrooms,
27storage rooms, mechanical rooms and
28parking

 

29Project Allocation

4,500,000

30(Base Project Allocation - $4,000,000)

 

1(Design & Contingencies - $500,000)

 

2(xvii.2) New Castle Maintenance Shop,
3Lawrence County

 

4(A) Rehabilitate maintenance shop,
5administrative offices, classrooms,
6storage rooms, mechanical rooms and
7parking

 

8Project Allocation

2,500,000

9(Base Project Allocation - $2,000,000)

 

10(Design & Contingencies - $500,000)

 

11(xvii.3) Combat Aviation Brigade Readiness
12Center, Lebanon County

 

13(A) Rehabilitate 28th Aviation Brigade at
14Fort Indiantown Gap, including
15assembly hall, classrooms,
16administrative offices, storage
17spaces, restrooms, lockers, mechanical
18rooms, HVAC, infrastructure and
19parking

 

20Project Allocation

4,500,000

21(Base Project Allocation - $4,000,000)

 

22(Design & Contingencies - $500,000)

 

23(xvii.4) Recruiting and Retention Battalion,
24Lebanon County

 

25(A) Rehabilitate recruiting and retention
26battalion at Fort Indiantown Gap to
27include assembly hall, classrooms,
28administrative offices, storage
29spaces, restrooms, locker rooms and
30mechanical rooms and upgrade the

 

1building systems, including HVAC,
2roofs, windows and doors and repairs
3to facade

 

4Project Allocation

2,500,000

5(Base Project Allocation - $2,000,000)

 

6(Design & Contingencies - $500,000)

 

7(xviii) Wilkes-Barre Readiness Center,
8Luzerne County

 

9(A) Rehabilitate Wilkes-Barre Readiness
10Center, including assembly hall,
11dining facility, classrooms,
12administrative offices, storage space,
13restrooms, locker rooms, parking for
14privately owned and military vehicles
15and renovation of existing facility

 

16Project Allocation

3,000,000

17(Base Project Allocation- $2,500,000)

 

18(Design & Contingencies - $500,000)

 

19(xviii.1) Williamsport Maintenance Shop,
20Lycoming County

 

21(A) Rehabilitate maintenance shop,
22administrative offices, classrooms,
23storage rooms, mechanical rooms and
24parking

 

25Project Allocation

2,500,000

26(Base Project Allocation - $2,000,000)

 

27(Design & Contingencies - $500,000)

 

28(xix) Bradford Readiness Center, McKean
29County

 

30(A) Expand Bradford Readiness Center,

 

1including additional classroom,
2administrative offices, storage space,
3restrooms, locker rooms, mechanical
4rooms and parking facilities

 

5Project Allocation

1,200,000

6(Base Project Allocation - $1,000,000)

 

7(Design & Contingencies - $200,000)

 

8(B) Expand Bradford Readiness Center,
9including infrastructure at airport

 

10Project Allocation

1,200,000

11(Base Project Allocation - $1,000,000)

 

12(Design & Contingencies - $200,000)

 

13(xx) Kane Readiness Center, McKean County

 

14(A) Rehabilitate Kane Readiness Center,
15including assembly hall, classrooms,
16administrative offices, storage space,
17restrooms, locker rooms and mechanical
18rooms; upgrade building systems (HVAC,
19roofs, windows, doors); repair façade;
20expand parking; and construct unheated
21storage facility

 

22Project Allocation

3,300,000

23(Base Project Allocation - $2,800,000)

 

24(Design & Contingencies - $500,000)

 

25(xxi) Hermitage Readiness Center, Mercer
26County

 

27(A) Rehabilitate Hermitage Readiness
28Center, including assembly hall,
29classrooms, administrative offices,
30storage space, restrooms, locker rooms

 

1and mechanical rooms; upgrade building
2systems (HVAC, roofs, windows, doors);
3repair façade; expand parking; and
4construct unheated storage facility

 

5Project Allocation

4,700,000

6(Base Project Allocation - $4,000,000)

 

7(Design & Contingencies - $700,000)

 

8(xxii) East Stroudsburg Readiness Center,
9Monroe County

 

10(A) Rehabilitate East Stroudsburg
11Readiness Center, including assembly
12hall, classrooms, administrative
13offices, storage space, restrooms,
14locker rooms and mechanical rooms;
15upgrade building systems (HVAC, roofs,
16windows, doors); repair façade; expand
17parking; and construct unheated
18storage facility

 

19Project Allocation

3,000,000

20(Base Project Allocation - $2,400,000)

 

21(Design & Contingencies - $600,000)

 

22(xxiii) Tobyhanna Armed Forces Reserve
23Center, Monroe County

 

24(A) Rehabilitation and building expansion
25of Tobyhanna Armed Forces Center,
26including assembly hall, kitchen,
27supply, locker room, administration
28and classroom with parking, including
29maintenance facility

 

30Project Allocation

600,000

1(Base Project Allocation - $500,000)

 

2(Design & Contingencies - $100,000)

 

3(xxiv) Plymouth Meeting Readiness Center,
4Montgomery County

 

5(A) Rehabilitate Plymouth Meeting
6Readiness Center, including assembly
7hall, classrooms, administrative
8offices, storage space, restrooms,
9locker rooms and mechanical rooms;
10upgrade building systems (HVAC, roofs,
11windows, doors); repair façade; expand
12parking; and construct unheated
13storage facility

 

14Project Allocation

4,500,000

15(Base Project Allocation - $3,900,000)

 

16(Design & Contingencies - $600,000)

 

17(xxv) Delaware Valley Veterans Home,
18Philadelphia County

 

19(A) Provide for renovation and general
20repairs of Delaware Valley Veterans
21Home, including life safety and
22regulatory deficiencies

 

23Project Allocation

10,250,000

24(Base Project Allocation - $9,225,000)

 

25(Design & Contingencies - $1,025,000)

 

26(B) Provide for renovation and general
27repairs of Delaware Valley Veterans
28Home, including life safety and
29regulatory deficiencies

 

30Project Allocation

5,625,000

1(Base Project Allocation - $4,500,000)

 

2(Design & Contingencies - $1,125,000)

 

3(xxv.1) Southampton Road Readiness Center,
4Philadelphia County

 

5(A) Rehabilitate assembly hall,
6classrooms, administrative offices,
7storage space, restrooms, lockers,
8mechanical rooms, HVAC, infrastructure
9and parking

 

10Project Allocation

4,500,000

11(Base Project Allocation - $4,000,000)

 

12(Design & Contingencies - $500,000)

 

13(xxv.2) 23rd Street Readiness Center,
14Philadelphia County

 

15(A) Rehabilitate assembly hall,
16classrooms, administrative offices,
17storage spaces, restrooms, lockers,
18mechanical rooms, HVAC, infrastructure
19and parking

 

20Project Allocation

3,500,000

21(Base Project Allocation - $3,000,000)

 

22(Design & Contingencies - $500,000)

 

<-23(xxv.3) Lancaster Avenue Readiness Center,
24Philadelphia County

 

25(A) Additional funding for DGS Project
26961-26, rehabilitate Philadelphia
27Lancaster Avenue Readiness Center, to
28support construction management
29services, commissioning and additional
30contingency funds

 

1Project Allocation

2,500,000

2(Base Project Allocation - $2,500,000)

 

3(xxvi) Schuylkill County Readiness Center,
4Schuylkill County

 

5(A) Purchase 10 to 20 acres of land for
6future construction of new Schuylkill
7County Readiness Center to replace
8current facilities to meet new
9requirements

 

10Project Allocation

1,600,000

11(Land Allocation - $1,600,000)

 

12(xxvi.1) Oil City Readiness Center, Venango
13County

 

14(A) Rehabilitate assembly hall,
15classrooms, administrative offices,
16storage spaces, restrooms, locker
17rooms and mechanical rooms and upgrade
18building systems, including HVAC,
19roofs, windows, doors and repairs to
20facade

 

21Project Allocation

3,500,000

22(Base Project Allocation - $3,000,000)

 

23(Design & Contingencies - $500,000)

 

24(xxvii) Mount Pleasant Readiness Center,
25Westmoreland County

 

26(A) Rehabilitate Mount Pleasant Readiness
27Center, including assembly hall,
28classrooms, administrative offices,
29storage space, restrooms, locker rooms
30and mechanical rooms; upgrade building

 

1systems (HVAC, roofs, windows, doors);
2repair façade; expand parking; and
3construct unheated storage facility

 

4Project Allocation

3,000,000

5(Base Project Allocation - $2,500,000)

 

6(Design & Contingencies - $500,000)

 

7(xxviii) York Readiness Center, York County

 

8(A) Rehabilitate York Readiness Center,
9including assembly hall, classrooms,
10administrative offices, storage space,
11restrooms, locker rooms and mechanical
12rooms; upgrade building systems (HVAC,
13roofs, windows, doors); repair façade;
14expand parking; and construct unheated
15storage space

 

16Project Allocation

2,400,000

17(Base Project Allocation - $2,000,000)

 

18(Design & Contingencies - $400,000)

 

19(10) Department of Public Welfare

 

20(i) Clarks Summit State Hospital

 

21(A) Replace all G & W oil switches and
22high voltage lines throughout facility
23and install new generators at
24Buildings 2 and 7, including new 200-
25amp service

 

26Project Allocation

5,000,000

27(Base Project Allocation - $4,300,000)

 

28(Design & Contingencies - $700,000)

 

29(B) Upgrade fire alarm and fire
30suppression system throughout facility

 

1Project Allocation

2,800,000

2(Base Project Allocation - $2,520,000)

 

3(Design & Contingencies - $280,000)

 

4(C) Replace boilers

 

5Project Allocation

4,200,000

6(Base Project Allocation - $3,780,000)

 

7(Design & Contingencies - $420,000)

 

8(ii) Cresson Secure Treatment Unit

 

9(A) Construct multipurpose modular
10building for classroom and gym use

 

11Project Allocation

3,000,000

12(Base Project Allocation - $2,500,000)

 

13(Design & Contingencies - $500,000)

 

14(iii) Danville State Hospital

 

15(A) Replace tower roof and flat roof of
16Building I

 

17Project Allocation

750,000

18(Base Project Allocation - $650,000)

 

19(Design & Contingencies - $100,000)

 

20(B) Replace roofs on various buildings

 

21Project Allocation

1,800,000

22(Base Project Allocation - $1,620,000)

 

23(Design & Contingencies - $180,000)

 

24(iv) Ebensburg Center

 

25(A) Replace, install and upgrade air
26conditioning to various hallways,
27corridors, day activity rooms, and
28dining areas in five residential units

 

29Project Allocation

500,000

30(Base Project Allocation - $388,000)

 

1(Design & Contingencies - $112,000)

 

2(B) Upgrade fire alarm and fire
3suppression system throughout facility

 

4Project Allocation

2,200,000

5(Base Project Allocation - $1,980,000)

 

6(Design & Contingencies - $220,000)

 

7(C) Replace current HVAC

 

8Project Allocation

3,500,000

9(Base Project Allocation - $3,150,000)

 

10(Design & Contingencies - $350,000)

 

11(iv.1) Hamburg Center

 

12(A) Demolish and remediate obsolete
13boiler plant building

 

14Project Allocation

1,000,000

15(Base Project Allocation - $900,000)

 

16(Design & Contingencies - $100,000)

 

17(v) Loysville Youth Development Center

 

18(A) Replace fire lines and pumps and
19install new fire sprinklers in
20Building 10

 

21Project Allocation

1,800,000

22(Base Project Allocation - $1,500,000)

 

23(Design & Contingencies - $300,000)

 

24(B) Upgrade and replace HVAC equipment
25throughout facility to meet current
26ventilation codes

 

27Project Allocation

3,000,000

28(Base Project Allocation - $2,700,000)

 

29(Design & Contingencies - $300,000)

 

30(vi) (Reserved)

 

1(vii) Norristown State Hospital

 

2(A) Demolish vacant and deteriorated
3buildings considered a nuisance and
4hazard

 

5Project Allocation

1,000,000

6(Base Project Allocation - $900,000)

 

7(Design & Contingencies - $100,000)

 

8(B) Upgrade and replace HVAC equipment
9throughout facility to meet current
10ventilation codes

 

11Project Allocation

5,000,000

12(Base Project Allocation - $4,500,000)

 

13(Design & Contingencies - $500,000)

 

14(viii) North Central Secure Treatment Unit

 

15(A) Construct multipurpose modular
16building for classroom and gym use

 

17Project Allocation

5,400,000

18(Base Project Allocation - $4,500,000)

 

19(Design & Contingencies - $900,000)

 

20(B) Replace existing standard glass
21windows with new security-type
22shatterproof glass windows for health
23and safety issues

 

24Project Allocation

600,000

25(Base Project Allocation - $540,000)

 

26(Design & Contingencies - $60,000)

 

27(C) Replace current HVAC to meet code
28requirements

 

29Project Allocation

9,000,000

30(Base Project Allocation - $8,100,000)

 

1(Design & Contingencies - $900,000)

 

2(viii.1) Philipsburg State Hospital

 

3(A) Demolish and remediate all campus
4buildings

 

5Project Allocation

6,000,000

6(Base Project Allocation - $5,400,000)

 

7(Design & Contingencies - $600,000)

 

8(ix) Polk Center

 

9(A) Remove and replace water plant

 

10Project Allocation

2,500,000

11(Base Project Allocation - $2,500,000)

 

12(B) Repair all mortar joints between
13brick and seal all brick and mortar
14joints

 

15Project Allocation

2,500,000

16(Base Project Allocation - $2,250,000)

 

17(Design & Contingencies - $250,000)

 

18(C) Upgrade fire alarm and fire
19suppression system throughout facility

 

20Project Allocation

1,800,000

21(Base Project Allocation - $1,620,000)

 

22(Design & Contingencies - $180,000)

 

23(x) Selinsgrove Center

 

24(A) Reseal joints and renovate lighting
25and drainage systems in steam tunnels
26between power plant and central
27building complex

 

28Project Allocation

550,000

29(Base Project Allocation - $475,000)

 

30(Design & Contingencies - $75,000)

 

1(B) Upgrade fire alarm and fire
2suppression system throughout facility

 

3Project Allocation

2,700,000

4(Base Project Allocation - $2,430,000)

 

5(Design & Contingencies - $270,000)

 

6(C) Funding for DGS Project 553-34
7relating to portable water

 

8Project Allocation

3,500,000

9(Base Project Allocation - $3,150,000)

 

10(Design & Contingencies - $350,000)

 

11(xi) South Mountain Restoration Center

 

12(A) Provide for breech of Carbarough Dam
13and land restoration to protect
14property and life as mandated by
15Department of Environmental Protection

 

16Project Allocation

3,500,000

17(Base Project Allocation - $3,150,000)

 

18(Design & Contingencies - $350,000)

 

19(xii) Torrance State Hospital

 

20(A) Replace existing wastewater treatment
21plant to comply with current
22regulations and codes

 

23Project Allocation

4,500,000

24(Base Project Allocation - $4,200,000)

 

25(Design & Contingencies - $300,000)

 

26(B) Additional funds for construction and
27replacement of existing wastewater
28treatment plant

 

29Project Allocation

2,000,000

30(Base Project Allocation - $2,000,000)

 

1(xiii) Warren State Hospital

 

2(A) Upgrade medium-voltage and low-
3voltage electrical gear throughout
4facility

 

5Project Allocation

4,000,000

6(Base Project Allocation - $3,600,000)

 

7(Design & Contingencies - $400,000)

 

8(xiii.1) Wernersville State Hospital

 

9(A) Replace boiler

 

10Project Allocation

1,500,000

11(Base Project Allocation - $1,350,000)

 

12(Design & Contingencies - $150,000)

 

13(xiv) White Haven Center

 

14(A) Upgrade fire alarm and fire
15suppression system throughout facility

 

16Project Allocation

2,100,000

17(Base Project Allocation - $1,890,000)

 

18(Design & Contingencies - $210,000)

 

19(B) Upgrade existing facility to comply
20with current emission requirements

 

21Project Allocation

5,500,000

22(Base Project Allocation - $4,950,000)

 

23(Design & Contingencies - $550,000)

 

24(C) Upgrade existing medium-voltage
25distribution system

 

26Project Allocation

5,000,000

27(Base Project Allocation - $4,500,000)

 

28(Design & Contingencies - $500,000)

 

29(xv) Youth Forestry Camp No. 2

 

30(A) Demolish existing building and

 

1construct new medical building

 

2Project Allocation

750,000

3(Base Project Allocation - $675,000)

 

4(Design & Contingencies - $75,000)

 

5(xvi) Youth Forestry Camp No. 3

 

6(A) Install HVAC

 

7Project Allocation

700,000

8(Base Project Allocation - $630,000)

 

9(Design & Contingencies - $70,000)

 

10(11) Pennsylvania State Police

 

11(i) DNA Laboratory, Westmoreland County

 

12(A) Construct new DNA laboratory in
13Greensburg to meet requirements and
14codes

 

15Project Allocation

29,000,000

16(Base Project Allocation - 22,500,000)

 

17(Land Allocation - $1,500,000)

 

18(Design & Contingencies - $5,000,000)

 

19(ii) Greensburg Headquarters, Westmoreland
20County

 

21(A) Design and construction of new
22headquarters facility

 

23Project Allocation

9,264,000

24(Base Project Allocation - $7,720,000)

 

25(Design & Contingencies - $1,544,000)

 

<-26(iii) Academy Complex, Derry Township,
27Dauphin County

 

28(A) Construction and other related costs
29for renovations to Pennsylvania State
30Police Academy Complex

 

1Project Allocation

8,164,000

2(Base Project Allocation - $7,220,000)

 

3(Design & Contingencies - $944,000)

 

<-4(iv) Erie Headquarters, Erie County

 

5(A) Additional funding for construction
6of new headquarters facility, garage,
7crime lab and aviation hangar to
8replace existing owned and leased
9facilities

 

10Project Allocation

6,000,000

11(Base Project Allocation - $6,000,000)

 

12(12) State System of Higher Education

 

13(i) Bloomsburg University

 

14(A) Construct facilities complex to
15centralize facilities management
16functions into single complex of
17buildings

 

18Project Allocation

19,000,000

19(Base Project Allocation -
20$15,200,000)

 

21(Design & Contingencies - $3,800,000)

 

22(ii) Cheyney University

 

23(A) Completely renovate Coppin Hall
24Building

 

25Project Allocation

9,000,000

26(Base Project Allocation - $7,200,000)

 

27(Design & Contingencies - $1,800,000)

 

28(B) Construction, infrastructure and
29other related costs for the design and
30construction of dormitory

 

1Project Allocation

12,000,000

2(Base Project Allocation -
3$10,000,000)

 

4(Design & Contingencies - $2,000,000)

 

5(C) Renovate Cope Athletic Complex and
6supporting academic spaces

 

7Project Allocation

10,000,000

8(Base Project Allocation - $8,000,000)

 

9(Design & Contingencies - $2,000,000)

 

<-10(D) Additional funding to construct new
11student housing

 

12Project Allocation

500,000

13(Base Project Allocation - $500,000)

 

14(iii) East Stroudsburg University

 

15(A) Completely renovate Kemp Library
16Building

 

17Project Allocation

45,000,000

18(Base Project Allocation -
19$36,000,000)

 

20(Design & Contingencies - $9,000,000)

 

21(iii.1) Edinboro University

 

<-22(A) Rehabilitate existing facility to
23house precision tool and mold design
24classrooms in Porreco Center

 

25Project Allocation

1,000,000

26(Base Project Allocation - $1,000,000)

 

<-27(A) Rehabilitate and renovate Porreco
28Center

 

29Project Allocation

5,000,000

30(Base Project Allocation - $5,000,000)

 

1(iv) Indiana University of Pennsylvania

 

2(A) Additional funding for renovation of
3Stapleton/Stabley Library, including
4space reconfiguration

 

5Project Allocation

14,500,000

6(Base Project Allocation -
7$11,600,000)

 

8(Design & Contingencies - $2,900,000)

 

9(v) Kutztown University

 

10(A) Additional funding for renovation of
11Beecky Education Building, including
12infrastructure

 

13Project Allocation

9,000,000

14(Base Project Allocation - $7,200,000)

 

15(Design & Contingencies - $1,800,000)

 

16(B) Renovate DeFrancesco Building
17interior

 

18Project Allocation

5,000,000

19(Base Project Allocation - $5,000,000)

 

20(vi) Lock Haven University

 

21(A) Renovate and upgrade campus
22electrical infrastructure to meet
23modern demands and efficiencies

 

24Project Allocation

16,000,000

25(Base Project Allocation -
26$12,800,000)

 

27(Design & Contingencies - $3,200,000)

 

28(B) Additional funding for renovation of
29South Ulmer Hall, including
30infrastructure converting from science

 

1to general classroom

 

2Project Allocation

23,000,000

3(Base Project Allocation -
4$18,400,000)

 

5(Design & Contingencies - $4,600,000)

 

6(C) Renovate Russell Hall, including
7infrastructure

 

8Project Allocation

15,000,000

9(Base Project Allocation -
10$12,000,000)

 

11(Design & Contingencies - $3,000,000)

 

<-12(D) Construction and other related costs
13for renovation of office building

 

14Project Allocation

10,000,000

15(Base Project Allocation -
16$10,000,000)

 

17(vii) Mansfield University

 

18(A) Renovate Belknap and Retan Halls to
19provide better functionality and space
20usage

 

21Project Allocation

10,000,000

22(Base Project Allocation - $8,000,000)

 

23(Design & Contingencies - $2,000,000)

 

24(B) Expand Butler Music Center, including
25infrastructure

 

26Project Allocation

8,000,000

27(Base Project Allocation - $6,400,000)

 

28(Design & Contingencies - $1,600,000)

 

29(C) Reroute Morris Drive

 

30Project Allocation

6,000,000

1(Base Project Allocation - $4,800,000)

 

2(Design & Contingencies - $1,200,000)

 

3(D) Demolish Maple Hall and construct new
4parking lot

 

5Project Allocation

6,000,000

6(Base Project Allocation - $4,800,000)

 

7(Design & Contingencies - $1,200,000)

 

8(E) Upgrade utilities and infrastructure
9campuswide and replace outdated
10systems

 

11Project Allocation

10,000,000

12(Base Project Allocation - $8,000,000)

 

13(Design & Contingencies - $2,000,000)

 

14(viii) Millersville University

 

15(A) Completely renovate Pucillo Hall,
16including infrastructure

 

17Project Allocation

7,000,000

18(Base Project Allocation - $5,600,000)

 

19(Design & Contingencies - $1,400,000)

 

20(B) Completely renovate Brooks Hall into
21health and wellness center

 

22Project Allocation

15,000,000

23(Base Project Allocation -
24$12,000,000)

 

25(Design & Contingencies - $3,000,000)

 

26(ix) Shippensburg University

 

27(A) Additional funding for renovation of
28Franklin Science Center

 

29Project Allocation

25,000,000

30(Base Project Allocation -

 

1$20,000,000)

 

2(Design & Contingencies - $5,000,000)

 

3(B) Additional funding for replacement of
4Henderson Hall

 

5Project Allocation

11,000,000

6(Base Project Allocation - $8,800,000)

 

7(Design & Contingencies - $2,200,000)

 

8(ix.1) Slippery Rock University

 

<-9(A) Renovate, demolish and construct an
10addition, including infrastructure to
11McKay Building

 

12Project Allocation

1,000,000

13(Base Project Allocation - $1,000,000)

 

<-14(A) Additional funding for renovation and
15addition to McKay Building

 

16Project Allocation

1,000,000

17(Base Project Allocation - $1,000,000)

 

18(x) West Chester University

 

19(A) Additional funding for renovation of
20Sturzebecker Health Science Center,
21including new addition

 

22Project Allocation

13,000,000

23(Base Project Allocation -
24$10,400,000)

 

25(Design & Contingencies - $2,600,000)

 

26(B) Construct new athletics facility,
27approximately 85,000 square feet

 

28Project Allocation

15,000,000

29(Base Project Allocation -
30$12,000,000)

 

1(Design & Contingencies - $3,000,000)

 

2(C) Renovate the Sturzebecker Health
3Science Center

 

4Project Allocation

20,000,000

5(Base Project Allocation -
6$16,000,000)

 

7(Design & Contingencies - $4,000,000)

 

8(13) Department of Transportation

 

9(i) Adams County

 

10(A) Construct new vehicle wash building
11at Adams County Maintenance Garage

 

12Project Allocation

690,000

13(Base Project Allocation - $600,000)

 

14(Design & Contingencies - $90,000)

 

15(B) Develop new stockpile facility in
16Adams County, including site purchase,
17design and construction

 

18Project Allocation

2,220,000

19(Base Project Allocation - $2,000,000)

 

20(Land Allocation - $20,000)

 

21(Design & Contingencies - $200,000)

 

22(C) Renovate and expand current Adams
23County Maintenance Garage, including
24roof replacement and building systems
25upgrade

 

26Project Allocation

2,500,000

27(Base Project Allocation - $2,200,000)

 

28(Design & Contingencies - $300,000)

 

29(D) Develop new stockpile, including site
30purchase, design and construction

 

1Project Allocation

3,000,000

2(Base Project Allocation - $1,750,000)

 

3(Land Allocation - $750,000)

 

4(Design & Contingencies - $500,000)

 

5(E) Construct four new storage buildings
6and site work at various stockpiles

 

7Project Allocation

1,400,000

8(Base Project Allocation - $1,190,000)

 

9(Design & Contingencies - $210,000)

 

10(F) Demolish and construct two new salt
11storage buildings and site work at
12Adams County Maintenance Stockpile

 

13Project Allocation

400,000

14(Base Project Allocation - $350,000)

 

15(Design & Contingencies - $50,000)

 

16(ii) Allegheny County

 

17(A) Renovate Allegheny County District
1811-0 Office, including roof,
19infrastructure, energy efficiencies
20and program requirements

 

21Project Allocation

2,200,000

22(Base Project Allocation - $2,000,000)

 

23(Design & Contingencies - $200,000)

 

24(B) Renovate Allegheny County Maintenance
25Garage, including roof,
26infrastructure, energy efficiencies
27and program requirements

 

28Project Allocation

825,000

29(Base Project Allocation - $750,000)

 

30(Design & Contingencies - $75,000)

 

1(C) Construct new PM/service/line paint
2building at the Neville Island
3Stockpile Facility

 

4Project Allocation

775,000

5(Base Project Allocation - $700,000)

 

6(Design & Contingencies - $75,000)

 

7(D) Construct new service/PM building at
8Fort Pitt Tunnel Facility to meet
9program requirements

 

10Project Allocation

3,850,000

11(Base Project Allocation - $3,500,000)

 

12(Design & Contingencies - $350,000)

 

13(E) Replace electric generators and
14remove existing roof systems at Fort
15Pitt, Liberty and Squirrel Hill Tunnel
16Facilities

 

17Project Allocation

3,350,000

18(Base Project Allocation - $3,000,000)

 

19(Design & Contingencies - $350,000)

 

20(F) Demolish and construct new salt
21storage buildings and site work at
22Allegheny County Maintenance Stockpile

 

23Project Allocation

2,400,000

24(Base Project Allocation - $2,100,000)

 

25(Design & Contingencies - $300,000)

 

26(G) Renovate and expand Rest Site 11,
27including roof replacement, upgrade
28building systems, sidewalks, curbing,
29step replacement, parking lot upgrades
30and sewage plant upgrades

 

1Project Allocation

2,000,000

2(Base Project Allocation - $1,800,000)

 

3(Design & Contingencies - $200,000)

 

4(H) Renovate and expand Rest Site 12,
5including roof replacement, upgrade
6building systems, sidewalks, curbing,
7step replacement, parking lot upgrades
8and sewage plant upgrades

 

9Project Allocation

2,000,000

10(Base Project Allocation - $1,800,000)

 

11(Design & Contingencies - $200,000)

 

12(I) Renovate and expand Allegheny County
13Driver Licensing Center, including
14roof replacement, upgrade building
15systems, sidewalks, curbing, step
16replacement, parking lot upgrades and
17sewage plant upgrades

 

18Project Allocation

1,400,000

19(Base Project Allocation - $1,250,000)

 

20(Design & Contingencies - $150,000)

 

21(J) Renovate and expand Allegheny County
22Maintenance Garage, including roof
23replacement, building systems upgrade
24and energy efficiency improvement

 

25Project Allocation

3,500,000

26(Base Project Allocation - $3,000,000)

 

27(Design & Contingencies - $500,000)

 

28(K) Construct new maintenance garage at
29Liberty Tunnels Facility

 

30Project Allocation

3,750,000

1(Base Project Allocation - $3,250,000)

 

2(Design & Contingencies - $500,000)

 

3(ii.1) Armstrong County

 

4(A) Demolish and construct new salt
5storage buildings and site work at
6Armstrong County Maintenance Stockpile

 

7Project Allocation

800,000

8(Base Project Allocation - $700,000)

 

9(Design & Contingencies - $100,000)

 

10(iii) Beaver County

 

11(A) Construct new PM/service/line paint
12building at Beaver County Maintenance
13Facility

 

14Project Allocation

775,000

15(Base Project Allocation - $700,000)

 

16(Design & Contingencies - $75,000)

 

17(B) Remove and replace roof system at
18Beaver County Maintenance Facility

 

19Project Allocation

525,000

20(Base Project Allocation - $450,000)

 

21(Design & Contingencies - $75,000)

 

22(C) Construct new PM building at Beaver
23County Maintenance Facility

 

24Project Allocation

1,100,000

25(Base Project Allocation - $1,000,000)

 

26(Design & Contingencies - $100,000)

 

27(D) Remove and replace HVAC system and
28wall installation at Beaver County
29Maintenance Office

 

30Project Allocation

1,150,000

1(Base Project Allocation - $1,000,000)

 

2(Design & Contingencies - $150,000)

 

3(E) Demolish and construct two new salt
4storage buildings and site work at
5Beaver County Maintenance Stockpile

 

6Project Allocation

800,000

7(Base Project Allocation - $700,000)

 

8(Design & Contingencies - $100,000)

 

9(F) Renovate and expand Beaver County
10Driver Licensing Center, including
11roof replacement, upgrade building
12systems, sidewalks, curbing, step
13replacement, parking lot upgrades and
14sewage plant upgrades

 

15Project Allocation

1,400,000

16(Base Project Allocation - $1,250,000)

 

17(Design & Contingencies - $150,000)

 

18(G) Renovate and expand Beaver County
19Maintenance Garage, including roof
20replacement, upgrade building systems
21and improve energy efficiency

 

22Project Allocation

3,600,000

23(Base Project Allocation - $3,250,000)

 

24(Design & Contingencies - $350,000)

 

<-25(H) Construction and other related costs
26for Hereford Manor dams

 

27Project Allocation

7,500,000

28(Base Project Allocation - $7,500,000)

 

29(iii.1) Bedford County

 

30(A) Develop new stockpile, including site

 

1purchase, design and construction

 

2Project Allocation

3,000,000

3(Base Project Allocation - $1,750,000)

 

4(Land Allocation - $750,000)

 

5(Design & Contingencies - $500,000)

 

6(B) Demolish and construct new salt
7storage buildings and site work at
8Bedford County Maintenance Stockpile

 

9Project Allocation

1,200,000

10(Base Project Allocation - $1,050,000)

 

11(Design & Contingencies - $150,000)

 

12(C) Construct new maintenance garage,
13including salt storage buildings,
14auxiliary buildings, site work and
15land acquisition

 

16Project Allocation

15,000,000

17(Base Project Allocation -
18$11,750,000)

 

19(Land Allocation - $1,000,000)

 

20(Design & Contingencies - $2,250,000)

 

21(D) Renovate and expand current county
22maintenance garage, including roof
23replacement, building systems upgrade
24and energy efficiency improvement

 

25Project Allocation

2,500,000

26(Base Project Allocation - $2,125,000)

 

27(Design & Contingencies - $375,000)

 

28(iv) Berks County

 

29(A) Construct new vehicle wash building
30at Berks County Maintenance Garage

 

1Project Allocation

690,000

2(Base Project Allocation - $600,000)

 

3(Design & Contingencies - $90,000)

 

4(B) Reskin metal building at Berks County
5Maintenance Facility

 

6Project Allocation

350,000

7(Base Project Allocation - $300,000)

 

8(Design & Contingencies - $50,000)

 

9(C) Renovate and expand Berks County
10Maintenance Garage, including roof
11replacement, building systems upgrade
12and energy efficiency improvement

 

13Project Allocation

2,000,000

14(Base Project Allocation - $1,700,000)

 

15(Design & Contingencies - $300,000)

 

16(iv.1) Blair County

 

17(A) Renovate and expand District Office
189-0, including roof replacement and
19building systems upgrade

 

20Project Allocation

2,000,000

21(Base Project Allocation - $1,700,000)

 

22(Design & Contingencies - $300,000)

 

23(B) Renovate and expand Blair County
24Maintenance Facility, including roof
25replacement and building systems
26upgrade

 

27Project Allocation

2,500,000

28(Base Project Allocation - $2,125,000)

 

29(Design & Contingencies - $375,000)

 

30(C) Design and construction of new

 

1district bridge slab building and site
2work at Blair County Maintenance
3Facility

 

4Project Allocation

350,000

5(Base Project Allocation - $300,000)

 

6(Design & Contingencies - $50,000)

 

7(D) Demolish and construct new salt
8storage building, including site work
9at Blair County Maintenance Facility

 

10Project Allocation

400,000

11(Base Project Allocation - $350,000)

 

12(Design & Contingencies - $50,000)

 

13(iv.2) Bradford County

 

14(A) Develop new stockpile facility,
15including site purchase, design and
16construction

 

17Project Allocation

3,000,000

18(Base Project Allocation - $1,750,000)

 

19(Land Allocation - $750,000)

 

20(Design & Contingencies - $500,000)

 

21(B) Demolish and construct new storage
22buildings and site work at various
23stockpiles at Bradford County
24Stockpile Facility

 

25Project Allocation

400,000

26(Base Project Allocation - $350,000)

 

27(Design & Contingencies - $50,000)

 

28(C) Demolish and construct new salt
29storage building and site work

 

30Project Allocation

5,000,000

1(Base Project Allocation - $4,500,000)

 

2(Design & Contingencies - $500,000)

 

3(D) Renovate and expand Bradford County
4Maintenance Garage, including roof
5replacement, building systems upgrade
6and energy efficiency improvement

 

7Project Allocation

2,000,000

8(Base Project Allocation - $1,700,000)

 

9(Design & Contingencies - $300,000)

 

10(iv.3) Bucks County

 

11(A) Construct new salt storage buildings
12and site work at Bucks County
13Maintenance Facility

 

14Project Allocation

1,600,000

15(Base Project Allocation - $1,400,000)

 

16(Design & Contingencies - $200,000)

 

17(B) Renovate and expand Welcome Center
18Site P, including roof replacement,
19building systems upgrade, sidewalks,
20curbing, step replacement, parking lot
21upgrades and sewage plant upgrades

 

22Project Allocation

1,050,000

23(Base Project Allocation - $1,000,000)

 

24(Design & Contingencies - $50,000)

 

25(iv.4) Cambria County

 

26(A) Develop new stockpile, including site
27purchase, design and construction

 

28Project Allocation

3,000,000

29(Base Project Allocation - $1,750,000)

 

30(Land Allocation - $750,000)

 

1(Design & Contingencies - $500,000)

 

2(B) Develop new stockpile, including site
3purchase, design and construction

 

4Project Allocation

3,000,000

5(Base Project Allocation - $1,750,000)

 

6(Land Allocation - $750,000)

 

7(Design & Contingencies - $500,000)

 

8(C) Demolish and construct new salt
9storage buildings and site work at
10Fulton County Maintenance Stockpile

 

11Project Allocation

800,000

12(Base Project Allocation - $720,000)

 

13(Design & Contingencies - $80,000)

 

14(D) Renovate and expand Cambria County
15Driver Licensing Center, including
16roof replacement, building systems
17upgrade, sidewalks, curbing, step
18replacement, parking lot upgrades and
19sewage plant upgrades

 

20Project Allocation

1,400,000

21(Base Project Allocation - $1,250,000)

 

22(Design & Contingencies - $150,000)

 

23(E) Renovate and expand Cambria County
24Maintenance Garage, including roof
25replacement, building systems upgrade
26and energy efficiency improvement

 

27Project Allocation

2,000,000

28(Base Project Allocation - $1,700,000)

 

29(Design & Contingencies - $300,000)

 

30(iv.5) Cameron County

 

1(A) Construct new county maintenance
2garage, including salt storage
3buildings, auxiliary buildings, site
4work and acquisition of land at
5Cameron County Maintenance Garage

 

6Project Allocation

15,000,000

7(Base Project Allocation -
8$11,775,000)

 

9(Land Allocation - $1,000,000)

 

10(Design & Contingencies - $2,225,000)

 

11(B) Renovate and expand current Cameron
12County Maintenance Garage, including
13roof replacement and building systems
14upgrade

 

15Project Allocation

2,000,000

16(Base Project Allocation - $1,700,000)

 

17(Design & Contingencies - $300,000)

 

18(iv.6) Carbon County

 

19(A) Construct new salt storage building
20and site work at Carbon County
21Maintenance Facility

 

22Project Allocation

400,000

23(Base Project Allocation - $350,000)

 

24(Design & Contingencies - $50,000)

 

25(B) Demolish and construct satellite
26office and garage at Hudsondale
27Stockpile

 

28Project Allocation

2,300,000

29(Base Project Allocation - $1,970,000)

 

30(Design & Contingencies - $30,000)

 

1(C) Renovate and expand Carbon County
2Maintenance Garage, including roof
3replacement, building systems upgrade
4and energy efficiency improvement

 

5Project Allocation

2,000,000

6(Base Project Allocation - $1,700,000)

 

7(Design & Contingencies - $300,000)

 

8(iv.7) Centre County

 

9(A) Renovate and expand current Centre
10County Maintenance Garage, including
11roof replacement and buildings systems
12upgrade

 

13Project Allocation

2,000,000

14(Base Project Allocation - $1,700,000)

 

15(Design & Contingencies - $300,000)

 

16(B) Renovate and expand County Rest Site
1729, including roof replacement,
18building systems upgrade, sidewalks,
19curbing, step replacement, parking lot
20upgrades and sewage plant upgrades

 

21Project Allocation

2,000,000

22(Base Project Allocation - $1,800,000)

 

23(Design & Contingencies - $200,000)

 

24(C) Renovate and expand County Rest Site
2530, including roof replacement,
26building systems upgrade, sidewalks,
27curbing, step replacement, parking lot
28upgrades and sewage plant upgrades

 

29Project Allocation

2,000,000

30(Base Project Allocation - $1,800,000)

 

1(Design & Contingencies - $200,000)

 

2(D) Renovate and expand Centre County
3Driver Licensing Center, including
4roof replacement, building systems
5upgrade, sidewalks, curbing, step
6replacement, parking lot upgrades and
7sewage plant upgrades

 

8Project Allocation

1,400,000

9(Base Project Allocation - $1,250,000)

 

10(Design & Contingencies - $150,000)

 

11(iv.8) Chester County

 

12(A) Construct new salt storage building
13and site work at Chester County
14Maintenance Facility

 

15Project Allocation

350,000

16(Base Project Allocation - $300,000)

 

17(Design & Contingencies - $50,000)

 

18(B) Construct new salt storage buildings
19and site work at Chester County
20Maintenance Facility

 

21Project Allocation

1,600,000

22(Base Project Allocation - $1,400,000)

 

23(Design & Contingencies - $200,000)

 

24(iv.9) Clarion County

 

25(A) Renovate and expand Clarion County
26Maintenance Garage, including roof
27replacement, building systems upgrade
28and energy efficiency improvement

 

29Project Allocation

1,900,000

30(Base Project Allocation - $1,700,000)

 

1(Design & Contingencies - $200,000)

 

2(iv.10) Clearfield County

 

3(A) Renovate and expand current
4Clearfield County Maintenance Garage,
5including roof replacement and
6building systems upgrades

 

7Project Allocation

2,000,000

8(Base Project Allocation - $1,700,000)

 

9(Design & Contingencies - $300,000)

 

10(B) Construct new salt storage buildings
11at Clearfield County Stockpile
12Facility

 

13Project Allocation

400,000

14(Base Project Allocation - $350,000)

 

15(Design & Contingencies - $50,000)

 

16(iv.11) Clinton County

 

17(A) Construct new salt storage buildings
18at Clinton County Stockpile Facility

 

19Project Allocation

800,000

20(Base Project Allocation - $700,000)

 

21(Design & Contingencies - $100,000)

 

22(B) Renovate and expand Rest Site 33,
23including roof replacement, building
24systems upgrade, sidewalks, curbing,
25step replacement, parking lot upgrades
26and sewage plant upgrades

 

27Project Allocation

2,000,000

28(Base Project Allocation - $1,800,000)

 

29(Design & Contingencies - $200,000)

 

30(C) Renovate and expand Rest Site 34,

 

1including roof replacement, building
2systems upgrade, sidewalks, curbing,
3step replacement, parking lot upgrades
4and sewage plant upgrades

 

5Project Allocation

2,000,000

6(Base Project Allocation - $1,800,000)

 

7(Design & Contingencies - $200,000)

 

8(iv.12) Columbia County

 

9(A) Renovate and expand Rest Site 37,
10including roof replacement, building
11systems upgrade, sidewalks, curbing,
12step replacement, parking lot upgrades
13and sewage plant upgrades

 

14Project Allocation

2,000,000

15(Base Project Allocation - $1,800,000)

 

16(Design & Contingencies - $200,000)

 

17(B) Renovate and expand Rest Site 38,
18including roof replacement, building
19systems upgrade, sidewalks, curbing,
20step replacement, parking lot upgrades
21and sewage plant upgrades

 

22Project Allocation

2,000,000

23(Base Project Allocation - $1,800,000)

 

24(Design & Contingencies - $200,000)

 

25(C) Renovate and expand current Columbia
26County Maintenance Garage, including
27roof replacement and building systems
28upgrade

 

29Project Allocation

2,000,000

30(Base Project Allocation - $1,700,000)

 

1(Design & Contingencies - $300,000)

 

2(D) Construction of new Columbia County
3Maintenance Garage, including salt
4storage buildings, auxiliary
5buildings, site work and land
6acquisition

 

7Project Allocation

15,000,000

8(Base Project Allocation -
9$11,750,000)

 

10(Land Allocation - $1,000,000)

 

11(Design & Contingencies - $2,250,000)

 

12(E) Construct new salt storage buildings
13at Columbia County Stockpile Facility

 

14Project Allocation

800,000

15(Base Project Allocation - $700,000)

 

16(Design & Contingencies - $100,000)

 

17(iv.13) Crawford County

 

18(A) Demolish and construct new storage
19buildings and site work at various
20stockpiles at Crawford County
21Maintenance Facility

 

22Project Allocation

350,000

23(Base Project Allocation - $298,000)

 

24(Design & Contingencies - $52,000)

 

25(B) Renovate and expand County Rest Site
2619, including roof replacement,
27building systems upgrade, sidewalks,
28curbing, step replacement, parking lot
29upgrades and sewage plant upgrades

 

30Project Allocation

2,500,000

1(Base Project Allocation - $2,200,000)

 

2(Design & Contingencies - $300,000)

 

3(C) Renovate and expand County Rest Site
420, including roof replacement,
5building systems upgrade, sidewalks,
6curbing, step replacement, parking lot
7upgrades and sewage plant upgrades

 

8Project Allocation

2,500,000

9(Base Project Allocation - $2,200,000)

 

10(Design & Contingencies - $300,000)

 

11(D) Renovate and expand Crawford County
12Driver Licensing Center, including
13roof replacement, building systems
14upgrade, sidewalks, curbing, step
15replacement, parking lot upgrades and
16sewage plant upgrades

 

17Project Allocation

1,400,000

18(Base Project Allocation - $1,250,000)

 

19(Design & Contingencies - $150,000)

 

20(E) Renovate and expand Crawford County
21Maintenance Garage, including roof
22replacement, building systems upgrade
23and energy efficiency improvement

 

24Project Allocation

2,500,000

25(Base Project Allocation - $2,125,000)

 

26(Design & Contingencies - $375,000)

 

27(iv.14) Cumberland County

 

28(A) Demolish and construct two new salt
29storage buildings and site work at
30Cumberland County Maintenance

 

1Stockpile

 

2Project Allocation

800,000

3(Base Project Allocation - $700,000)

 

4(Design & Contingencies - $100,000)

 

5(B) Renovate and expand Rest Site 45,
6including roof replacement, building
7systems upgrade, sidewalks, curbing,
8step replacement, parking lot upgrades
9and sewage plant upgrades

 

10Project Allocation

2,000,000

11(Base Project Allocation - $1,800,000)

 

12(Design & Contingencies - $200,000)

 

13(C) Renovate and expand Rest Site 46,
14including roof replacement, building
15systems upgrade, sidewalks, curbing,
16step replacement, parking lot upgrades
17and sewage plant upgrades

 

18Project Allocation

2,000,000

19(Base Project Allocation - $1,800,000)

 

20(Design & Contingencies - $200,000)

 

21(v) Dauphin County

 

22(A) Construct new vehicle wash building
23at Dauphin County Maintenance Garage

 

24Project Allocation

690,000

25(Base Project Allocation - $600,000)

 

26(Design & Contingencies - $90,000)

 

27(B) Develop new stockpile facility in
28Dauphin County, including site
29purchase, design and construction

 

30Project Allocation

2,220,000

1(Base Project Allocation - $2,000,000)

 

2(Land Allocation - $20,000)

 

3(Design & Contingencies - $200,000)

 

4(C) Construct new vehicle wash building
5at Dauphin County Maintenance Garage
6Stockpile 02 in Elizabethville

 

7Project Allocation

690,000

8(Base Project Allocation - $600,000)

 

9(Design & Contingencies - $90,000)

 

10(D) Renovate and expand District Office
118-0, including roof replacement and
12building systems upgrade

 

13Project Allocation

2,000,000

14(Base Project Allocation - $1,700,000)

 

15(Design & Contingencies - $300,000)

 

16(E) Renovate and expand current Dauphin
17County Maintenance Garage, including
18roof replacement and building systems
19upgrade

 

20Project Allocation

2,500,000

21(Base Project Allocation - $2,125,000)

 

22(Design & Contingencies - $375,000)

 

23(F) Demolish and construct two new salt
24storage buildings and site work at
25Dauphin County Maintenance Stockpile

 

26Project Allocation

800,000

27(Base Project Allocation - $700,000)

 

28(Design & Contingencies - $100,000)

 

29(G) Renovation and expansion of Dauphin
30County Sign Shop, including roof

 

1replacement and building systems
2upgrade

 

3Project Allocation

2,500,000

4(Base Project Allocation - $2,200,000)

 

5(Design & Contingencies - $300,000)

 

6(H) Renovate and expand Dauphin County
7Fleet Management Facility, including
8roof replacement and building systems
9upgrade

 

10Project Allocation

3,500,000

11(Base Project Allocation - $3,100,000)

 

12(Design & Contingencies - $400,000)

 

13(vi) Delaware County

 

14(A) Develop new stockpile facility in
15Delaware County, including site
16purchase, design and construction

 

17Project Allocation

2,220,000

18(Base Project Allocation - $2,000,000)

 

19(Land Allocation - $20,000)

 

20(Design & Contingencies - $200,000)

 

21(B) Construct new salt storage buildings
22and site work at Delaware County
23Maintenance Facility

 

24Project Allocation

800,000

25(Base Project Allocation - $700,000)

 

26(Design & Contingencies - $100,000)

 

27(C) Renovate and expand Welcome Center
28Site P, including roof replacement,
29building systems upgrade, sidewalks,
30curbing, step replacement, parking lot

 

1upgrades and sewage plant upgrades

 

2Project Allocation

1,050,000

3(Base Project Allocation - $1,000,000)

 

4(Design & Contingencies - $50,000)

 

5(D) Renovate and expand Delaware County
6Maintenance Garage, including roof
7replacement, building systems upgrade
8and energy efficiency improvement

 

9Project Allocation

1,500,000

10(Base Project Allocation - $1,000,000)

 

11(Design & Contingencies - $500,000)

 

12(vi.1) Elk County

 

13(A) Construct new salt storage building
14at Elk County Stockpile Facility

 

15Project Allocation

350,000

16(Base Project Allocation - $300,000)

 

17(Design & Contingencies - $50,000)

 

18(vi.2) Erie County

 

19(A) Develop new stockpile facilities,
20including site purchase, design and
21construction at Erie County Stockpile
22Facility

 

23Project Allocation

9,000,000

24(Base Project Allocation - $5,250,000)

 

25(Land Allocation - $2,250,000)

 

26(Design & Contingencies - $1,500,000)

 

27(B) Renovate and expand Welcome Center
28Site L, including roof replacement,
29building systems upgrade, sidewalks,
30curbing, step replacement, parking lot

 

1upgrades and sewage plant upgrades

 

2Project Allocation

2,500,000

3(Base Project Allocation - $2,200,000)

 

4(Design & Contingencies - $300,000)

 

5(C) Renovate and expand Welcome Center
6Site M, including roof replacement,
7building systems upgrade, sidewalks,
8curbing, step replacement, parking lot
9upgrades and sewage plant upgrades

 

10Project Allocation

2,000,000

11(Base Project Allocation - $1,800,000)

 

12(Design & Contingencies - $200,000)

 

13(D) Renovate and expand Erie County
14Maintenance Garage, including roof
15replacement, building systems upgrade
16and energy efficiency improvement

 

17Project Allocation

2,500,000

18(Base Project Allocation - $2,125,000)

 

19(Design & Contingencies - $375,000)

 

20(vi.3) Fayette County

 

21(A) Construct new maintenance garage,
22including slat storage buildings,
23auxiliary buildings, site work and
24land acquisition

 

25Project Allocation

15,000,000

26(Base Project Allocation -
27$11,750,000)

 

28(Land Allocation - $1,000,000)

 

29(Design & Contingencies - $2,250,000)

 

30(B) Demolish and construct three new salt

 

1storage buildings and site work at
2Fayette County Maintenance Facility

 

3Project Allocation

1,200,000

4(Base Project Allocation - $1,050,000)

 

5(Design & Contingencies - $150,000)

 

6(C) Renovate and expand District Office
712-0, including roof replacement and
8building systems upgrade

 

9Project Allocation

2,500,000

10(Base Project Allocation - $2,150,000)

 

11(Design & Contingencies - $350,000)

 

12(D) Renovate and expand current driver
13licensing center, including roof
14replacement, building systems upgrade,
15sidewalks, curbing and parking lot
16upgrades

 

17Project Allocation

1,400,000

18(Base Project Allocation - $1,250,000)

 

19(Design & Contingencies - $150,000)

 

20(vi.4) Forest County

 

21(A) Construct new Forest County
22Maintenance Garage, including salt
23storage buildings, auxiliary
24buildings, site work and land
25acquisition

 

26Project Allocation

15,000,000

27(Base Project Allocation -
28$11,750,000)

 

29(Land Allocation - $1,000,000)

 

30(Design & Contingencies - $2,250,000)

 

1(B) Construct new salt storage facility
2at Forest County Stockpile Facility

 

3Project Allocation

350,000

4(Base Project Allocation - $298,000)

 

5(Design & Contingencies - $52,000)

 

6(vii) Franklin County

 

7(A) Develop new stockpile facility in
8Franklin County, including site
9purchase, design and construction

 

10Project Allocation

2,220,000

11(Base Project Allocation - $2,000,000)

 

12(Land Allocation - $20,000)

 

13(Design & Contingencies - $200,000)

 

14(B) Develop new stockpile facility to
15replace SP 17 in Franklin County,
16including site purchase, design and
17construction

 

18Project Allocation

2,220,000

19(Base Project Allocation - $2,000,000)

 

20(Land Allocation - $20,000)

 

21(Design & Contingencies - $200,000)

 

22(C) Construct new storage buildings and
23site work at various stockpiles

 

24Project Allocation

1,800,000

25(Base Project Allocation - $1,530,000)

 

26(Design & Contingencies - $270,000)

 

27(D) Renovate and expand current Franklin
28County Maintenance Garage, including
29roof replacement and building systems
30upgrade

 

1Project Allocation

2,000,000

2(Base Project Allocation - $1,700,000)

 

3(Design & Contingencies - $300,000)

 

4(E) Construct new salt storage buildings
5and site work at Franklin County
6Maintenance Stockpile

 

7Project Allocation

800,000

8(Base Project Allocation - $700,000)

 

9(Design & Contingencies - $100,000)

 

10(F) Renovate and expand Welcome Center
11Site G, including roof replacement,
12building systems upgrade, sidewalks,
13curbing, step replacement, parking lot
14upgrades and sewage plant upgrades

 

15Project Allocation

2,000,000

16(Base Project Allocation - $1,800,000)

 

17(Design & Contingencies - $200,000)

 

18(G) Renovate and expand current driver
19licensing center, including roof
20replacement, building systems upgrade,
21sidewalks, curbing and parking lot
22upgrades

 

23Project Allocation

1,400,000

24(Base Project Allocation - $1,250,000)

 

25(Design & Contingencies - $150,000)

 

26(vii.1) Fulton County

 

27(A) Renovate and expand current
28maintenance facility, including roof
29replacement, building systems upgrade
30and construction of two bays with

 

1overhead cranes

 

2Project Allocation

2,700,000

3(Base Project Allocation - $2,350,000)

 

4(Design & Contingencies - $350,000)

 

5(B) Demolish and construct new salt
6storage buildings and site work at
7Fulton County Maintenance Stockpile

 

8Project Allocation

1,200,000

9(Base Project Allocation - $1,050,000)

 

10(Design & Contingencies - $150,000)

 

11(C) Renovate and expand Welcome Center
12Site B, including roof replacement,
13building systems upgrade, sidewalks,
14curbing, step replacement, parking lot
15upgrades and sewage plant upgrades

 

16Project Allocation

2,500,000

17(Base Project Allocation - $2,200,000)

 

18(Design & Contingencies - $300,000)

 

19(D) Renovate and expand Rest Site 3,
20including roof replacement, building
21systems upgrade, sidewalks, curbing,
22step replacement, parking lot upgrades
23and sewage plant upgrades

 

24Project Allocation

2,500,000

25(Base Project Allocation - $2,200,000)

 

26(Design & Contingencies - $300,000)

 

27(vii.2) Greene County

 

28(A) Rehabilitate and expand Greene County
29Welcome Center

 

30Project Allocation

1,800,000

1(Base Project Allocation - $1,530,000)

 

2(Design & Contingencies - $270,000)

 

3(B) Demolish and construct new salt
4storage buildings and site work at
5Greene County Maintenance Stockpile

 

6Project Allocation

800,000

7(Base Project Allocation - $720,000)

 

8(Design & Contingencies - $80,000)

 

9(C) Renovate and expand Greene County
10Maintenance Facility, including roof
11replacement and building systems
12upgrade

 

13Project Allocation

3,000,000

14(Base Project Allocation - $2,650,000)

 

15(Design & Contingencies - $350,000)

 

16(D) Renovate and expand Welcome Center
17Site D, including roof replacement,
18building systems upgrade, sidewalks,
19curbing, step replacement, parking lot
20upgrades and sewage plant upgrades

 

21Project Allocation

2,500,000

22(Base Project Allocation - $2,200,000)

 

23(Design & Contingencies - $300,000)

 

24(E) Renovate and expand Greene County
25Driver Licensing Center, including
26roof replacement, building systems
27upgrade, sidewalks, curbing, step
28replacement, parking lot upgrades and
29sewage plant upgrades

 

30Project Allocation

1,400,000

1(Base Project Allocation - $1,250,000)

 

2(Design & Contingencies - $150,000)

 

3(vii.3) Huntingdon County

 

4(A) Renovate and expand Huntingdon County
5Maintenance Facility, including roof
6replacement and building systems
7upgrade

 

8Project Allocation

2,700,000

9(Base Project Allocation - $2,350,000)

 

10(Design & Contingencies - $350,000)

 

11(B) Demolish and construct new salt
12storage buildings and site work at
13Huntingdon County Maintenance
14Stockpile

 

15Project Allocation

1,200,000

16(Base Project Allocation - $1,050,000)

 

17(Design & Contingencies - $150,000)

 

18(vii.4) Indiana County

 

19(A) Develop new stockpile, including site
20purchase, design and construction

 

21Project Allocation

3,050,000

22(Base Project Allocation - $1,750,000)

 

23(Land Allocation - $750,000)

 

24(Design & Contingencies - $550,000)

 

25(B) Renovate and expand Indiana County
26Maintenance Garage, including roof
27replacement, building systems upgrade
28and energy efficiency improvement

 

29Project Allocation

2,520,000

30(Base Project Allocation - $2,220,000)

 

1(Design & Contingencies - $300,000)

 

2(vii.5) Jefferson County

 

3(A) Renovate and expand Rest Site 25,
4including roof replacement, building
5systems upgrade, sidewalks, curbing,
6step replacement, parking lot upgrades
7and sewage plant upgrades

 

8Project Allocation

2,500,000

9(Base Project Allocation - $2,200,000)

 

10(Design & Contingencies - $300,000)

 

11(B) Renovate and expand Rest Site 26,
12including roof replacement, building
13systems upgrade, sidewalks, curbing,
14step replacement, parking lot upgrades
15and sewage plant upgrades

 

16Project Allocation

2,500,000

17(Base Project Allocation - $2,200,000)

 

18(Design & Contingencies - $300,000)

 

19(C) Renovate and expand Jefferson County
20Maintenance Garage, including roof
21replacement, building systems upgrade
22and energy efficiency improvement

 

23Project Allocation

1,500,000

24(Base Project Allocation - $1,350,000)

 

25(Design & Contingencies - $150,000)

 

26(vii.6) Juniata County

 

27(A) Renovate and expand Juniata County
28Maintenance Garage, including roof
29replacement, building systems upgrade
30and energy efficiency improvement

 

1Project Allocation

2,000,000

2(Base Project Allocation - $1,700,000)

 

3(Design & Contingencies - $300,000)

 

4(viii) Lackawanna County

 

5(A) Renovate and expand District 4-0
6District Office to bring building into
7code compliance, upgrade buildings
8systems and improve program
9requirements and energy efficiency

 

10Project Allocation

2,750,000

11(Base Project Allocation - $2,500,000)

 

12(Design & Contingencies - $250,000)

 

13(B) Construct new county metal storage
14building at Lackawanna County
15Maintenance Facility

 

16Project Allocation

350,000

17(Base Project Allocation - $300,000)

 

18(Design & Contingencies - $50,000)

 

19(C) Construct new Lackawanna County
20Maintenance Garage

 

21Project Allocation

15,000,000

22(Base Project Allocation -
23$11,750,000)

 

24(Land Allocation - $1,000,000)

 

25(Design & Contingencies - $2,250,000)

 

26(D) Renovate and expand current
27Lackawanna County Maintenance Garage,
28including roof replacement and
29building systems upgrade

 

30Project Allocation

2,520,000

1(Base Project Allocation - $2,125,000)

 

2(Design & Contingencies - $375,000)

 

3(E) Demolish and construct four new
4storage buildings and site work at
5various stockpiles at Lackawanna
6County Stockpile Facility

 

7Project Allocation

1,600,000

8(Base Project Allocation - $1,400,000)

 

9(Design & Contingencies - $200,000)

 

10(F) Construct addition to District Office
114-0 for expansion of work units,
12conference rooms and cafeteria

 

13Project Allocation

4,000,000

14(Base Project Allocation - $3,400,000)

 

15(Design & Contingencies - $600,000)

 

16(G) Renovate and expand Lackawanna County
17Roadside Rest Site 36, including roof
18replacement, building systems upgrade,
19energy efficiency improvement,
20sidewalks, curbing and step
21replacement, parking lot upgrades and
22water and sewer treatment plant
23upgrades

 

24Project Allocation

2,500,000

25(Base Project Allocation - $2,200,000)

 

26(Design & Contingencies - $300,000)

 

27(ix) Lancaster County

 

28(A) Develop new stockpile facility in
29Lancaster County, including site
30purchase, design and construction

 

1Project Allocation

2,220,000

2(Base Project Allocation - $2,000,000)

 

3(Land Allocation - $20,000)

 

4(Design & Contingencies - $200,000)

 

5(B) Renovate and expand current Lancaster
6County Maintenance Garage, including
7roof replacement and building systems
8upgrade

 

9Project Allocation

2,500,000

10(Base Project Allocation - $2,125,000)

 

11(Design & Contingencies - $375,000)

 

12(C) Demolish and construct new salt
13storage buildings and site work at
14various stockpiles

 

15Project Allocation

2,000,000

16(Base Project Allocation - $1,750,000)

 

17(Design & Contingencies - $250,000)

 

18(x) Lawrence County

 

19(A) Construct new PM building at Lawrence
20County Maintenance Facility

 

21Project Allocation

825,000

22(Base Project Allocation - $750,000)

 

23(Design & Contingencies - $75,000)

 

24(B) Develop new stock pile facility,
25including site purchase, design and
26construction

 

27Project Allocation

3,000,000

28(Base Project Allocation - $1,750,000)

 

29(Land Allocation - $750,000)

 

30(Design & Contingencies - $500,000)

 

1(C) Construct new salt storage building
2at Lawrence County Maintenance
3Facility

 

4Project Allocation

800,000

5(Base Project Allocation - $720,000)

 

6(Design & Contingencies - $80,000)

 

7(D) Construct new maintenance garage,
8including salt storage buildings,
9auxiliary buildings, site work and
10land acquisition

 

11Project Allocation

15,000,000

12(Base Project Allocation -
13$11,750,000)

 

14(Land Allocation - $1,000,000)

 

15(Design & Contingencies - $2,250,000)

 

16(E) Demolish and construct two new salt
17storage buildings and site work at
18Lawrence County Maintenance Stockpile

 

19Project Allocation

800,000

20(Base Project Allocation - $700,000)

 

21(Design & Contingencies - $100,000)

 

22(F) Renovate and expand Lawrence County
23Driver Licensing Center, including
24roof replacement, building systems
25upgrade, sidewalks, curbing, step
26replacement, parking lot upgrades and
27sewage plant upgrades

 

28Project Allocation

1,400,000

29(Base Project Allocation - $1,250,000)

 

30(Design & Contingencies - $150,000)

 

1(G) Renovate and expand Lawrence County
2Roadside Rest Site 15, including roof
3replacement, building systems upgrade,
4energy efficiency improvement,
5sidewalks, curbing, step replacement
6and parking lot upgrades

 

7Project Allocation

1,250,000

8(Base Project Allocation - $1,200,000)

 

9(Design & Contingencies - $50,000)

 

10(H) Renovate and expand Lawrence County
11Roadside Rest Site 16, including roof
12replacement, building systems upgrade,
13energy efficiency improvement,
14sidewalks, curbing, step replacement
15and parking lot upgrades

 

16Project Allocation

1,250,000

17(Base Project Allocation - $1,200,000)

 

18(Design & Contingencies - $50,000)

 

19(x.1) Lebanon County

 

20(A) Construct new maintenance garage,
21including salt storage buildings,
22auxiliary buildings, site work and
23land acquisition

 

24Project Allocation

15,000,000

25(Base Project Allocation -
26$11,750,000)

 

27(Land Allocation - $1,000,000)

 

28(Design & Contingencies - $2,250,000)

 

29(B) Demolish and construct new salt
30storage buildings and site work at

 

1various stockpiles

 

2Project Allocation

1,600,000

3(Base Project Allocation - $1,400,000)

 

4(Design & Contingencies - $200,000)

 

5(C) Renovate and expand Lebanon County
6Driver Licensing Center, including
7roof replacement, building systems
8upgrade, sidewalks, curbing, step
9replacement, parking lot upgrades and
10sewage plant upgrades

 

11Project Allocation

1,400,000

12(Base Project Allocation - $1,250,000)

 

13(Design & Contingencies - $150,000)

 

14(D) Renovate and expand Lebanon County
15Maintenance Garage, including roof
16replacement, building systems upgrade
17and energy efficiency improvement

 

18Project Allocation

2,000,000

19(Base Project Allocation - $1,700,000)

 

20(Design & Contingencies - $300,000)

 

21(xi) Lehigh County

 

22(A) Construct new vehicle wash building
23at Lehigh County Maintenance Garage

 

24Project Allocation

690,000

25(Base Project Allocation - $600,000)

 

26(Design & Contingencies - $90,000)

 

27(B) Renovate and expand Lehigh County
28Maintenance Garage to upgrade building
29systems and improve program
30requirements and energy efficiency

 

1Project Allocation

1,150,000

2(Base Project Allocation - $1,000,000)

 

3(Design & Contingencies - $150,000)

 

4(C) Construction of new salt storage
5building at Lehigh County Maintenance
6Facility

 

7Project Allocation

350,000

8(Base Project Allocation - $300,000)

 

9(Design & Contingencies - $50,000)

 

10(D) Renovate and expand District Office
115-0, including roof replacement and
12building systems upgrade

 

13Project Allocation

2,000,000

14(Base Project Allocation - $1,700,000)

 

15(Design & Contingencies - $300,000)

 

16(E) Renovate and expand Lehigh County
17Maintenance Facility, including roof
18replacement, building systems upgrade
19and energy efficiency improvement

 

20Project Allocation

1,500,000

21(Base Project Allocation - $1,275,000)

 

22(Design & Contingencies - $225,000)

 

23(xii) Luzerne County

 

24(A) Develop new stockpile facility,
25including site purchase, design and
26construction

 

27Project Allocation

2,220,000

28(Base Project Allocation - $2,000,000)

 

29(Land Allocation - $20,000)

 

30(Design & Contingencies - $200,000)

 

1(B) Construct new salt storage buildings
2at Luzerne County Maintenance Facility

 

3Project Allocation

850,000

4(Base Project Allocation - $730,000)

 

5(Design & Contingencies - $120,000)

 

6(C) Construct new bay storage buildings
7with overhead doors at Luzerne County
8Maintenance Facility

 

9Project Allocation

350,000

10(Base Project Allocation - $300,000)

 

11(Design & Contingencies - $50,000)

 

12(D) Construct new county metal storage
13building at Luzerne County Maintenance
14Facility

 

15Project Allocation

350,000

16(Base Project Allocation - $300,000)

 

17(Design & Contingencies - $50,000)

 

18(E) Construct seven new salt storage
19buildings and site work at various
20stockpiles at Luzerne County Stockpile
21Facility

 

22Project Allocation

2,800,000

23(Base Project Allocation - $2,450,000)

 

24(Design & Contingencies - $350,000)

 

25(F) Renovate and expand Rest Site 39,
26including roof replacement, building
27systems upgrade, sidewalks, curbing,
28step replacement, parking lot upgrades
29and sewage plant upgrades

 

30Project Allocation

2,500,000

1(Base Project Allocation - $2,200,000)

 

2(Design & Contingencies - $300,000)

 

3(G) Renovate and expand Rest Site 53,
4including roof replacement, building
5systems upgrade, sidewalks, curbing,
6step replacement, parking lot upgrades
7and sewage plant upgrades

 

8Project Allocation

1,050,000

9(Base Project Allocation - $1,000,000)

 

10(Design & Contingencies - $50,000)

 

11(H) Renovate and expand Rest Site 54,
12including roof replacement, building
13systems upgrade, sidewalks, curbing,
14step replacement, parking lot upgrades
15and sewage plant upgrades

 

16Project Allocation

1,050,000

17(Base Project Allocation - $1,000,000)

 

18(Design & Contingencies - $50,000)

 

19(xii.1) Lycoming County

 

20(A) Demolish and construct new storage
21buildings and site work at various
22stockpiles at Lycoming County
23Stockpile Facility

 

24Project Allocation

1,200,000

25(Base Project Allocation - $1,050,000)

 

26(Design & Contingencies - $150,000)

 

27(B) Renovate and expand current District
28Office 3-0, including roof replacement
29and building systems upgrade

 

30Project Allocation

2,500,000

1(Base Project Allocation - $2,125,000)

 

2(Design & Contingencies - $375,000)

 

3(C) Renovate and expand Lycoming County
4Maintenance Garage, including roof
5replacement, building systems upgrade
6and energy efficiency improvement

 

7Project Allocation

2,000,000

8(Base Project Allocation - $1,700,000)

 

9(Design & Contingencies - $300,000)

 

10(xii.2) McKean County

 

11(A) Construct new salt storage buildings
12at McKean County Stockpile Facility

 

13Project Allocation

700,000

14(Base Project Allocation - $650,000)

 

15(Design & Contingencies - $50,000)

 

16(B) Renovate and expand McKean County
17Maintenance Garage, including roof
18replacement, building systems upgrade
19and energy efficiency improvement

 

20Project Allocation

2,000,000

21(Base Project Allocation - $1,700,000)

 

22(Design & Contingencies - $300,000)

 

23(xii.3) Mercer County

 

24(A) Develop new maintenance garage,
25including site purchase, design and
26construction at Mercer County
27Maintenance Garage

 

28Project Allocation

2,500,000

29(Base Project Allocation - $2,125,000)

 

30(Design & Contingencies - $375,000)

 

1(B) Renovate and expand Rest Site 17,
2including roof replacement, building
3systems upgrade, sidewalks, curbing,
4step replacement, parking lot upgrades
5and sewage plant upgrades

 

6Project Allocation

2,500,000

7(Base Project Allocation - $2,200,000)

 

8(Design & Contingencies - $300,000)

 

9(C) Renovate and expand Rest Site 18,
10including roof replacement, building
11systems upgrade, sidewalks, curbing,
12step replacement, parking lot upgrades
13and sewage plant upgrades

 

14Project Allocation

2,500,000

15(Base Project Allocation - $2,200,000)

 

16(Design & Contingencies - $300,000)

 

17(D) Construct new county maintenance
18garage, including salt storage
19buildings, auxiliary buildings, site
20work and acquisition of site at Mercer
21County Maintenance Garage

 

22Project Allocation

15,000,000

23(Base Project Allocation -
24$11,750,000)

 

25(Land Allocation - $1,000,000)

 

26(Design & Contingencies - $2,250,000)

 

27(E) Demolish and construct new storage
28buildings and site work at various
29stock piles at Mercer County Stockpile
30Facility

 

1Project Allocation

800,000

2(Base Project Allocation - $700,000)

 

3(Design & Contingencies - $100,000)

 

4(F) Renovate and expand Mercer County
5Driver Licensing Center, including
6roof replacement, building systems
7upgrade, sidewalks, curbing, step
8replacement, parking lot upgrades and
9sewage plant upgrades

 

10Project Allocation

1,400,000

11(Base Project Allocation - $1,250,000)

 

12(Design & Contingencies - $150,000)

 

13(xii.4) Mifflin County

 

14(A) Renovate and expand Mifflin County
15Driver Licensing Center, including
16roof replacement, building systems
17upgrade, sidewalks, curbing, step
18replacement, parking lot upgrades and
19sewage plant upgrades

 

20Project Allocation

1,400,000

21(Base Project Allocation - $1,250,000)

 

22(Design & Contingencies - $150,000)

 

23(xii.5) Monroe County

 

24(A) Construct new salt storage building,
25auxiliary buildings, site work and
26land acquisition at Monroe County
27Maintenance Facility

 

28Project Allocation

15,000,000

29(Base Project Allocation -
30$11,750,000)

 

1(Land Allocation - $1,000,000)

 

2(Design & Contingencies - $2,250,000)

 

3(B) Renovate and expand current Monroe
4County Welcome Center, including roof
5replacement and building systems
6upgrade

 

7Project Allocation

3,000,000

8(Base Project Allocation - $2,550,000)

 

9(Design & Contingencies - $450,000)

 

10(C) Renovate and expand Rest Site 41,
11including roof replacement, building
12systems upgrade, program requirements
13improvement, sidewalks, curbing, step
14replacement, parking lot upgrades and
15sewage plant upgrades

 

16Project Allocation

2,500,000

17(Base Project Allocation - $2,200,000)

 

18(Design & Contingencies - $300,000)

 

19(D) Renovate and expand Monroe County
20Maintenance Facility, including roof
21replacement, building systems upgrades
22and energy efficiency improvement

 

23Project Allocation

2,000,000

24(Base Project Allocation - $1,700,000)

 

25(Design & Contingencies - $300,000)

 

26(xiii) Montgomery County

 

27(A) Renovate Montgomery County District
28Office by designing and constructing
29dry chemical fire protection system
30for TCC and all server rooms

 

1Project Allocation

440,000

2(Base Project Allocation - $400,000)

 

3(Design & Contingencies - $40,000)

 

4(B) Construct new garage parking deck at
5Montgomery County District Office

 

6Project Allocation

3,300,000

7(Base Project Allocation - $3,000,000)

 

8(Design & Contingencies - $300,000)

 

9(C) Renovate and expand Montgomery County
10Maintenance Garage to upgrade building
11systems and improve program
12requirements and energy efficiency

 

13Project Allocation

825,000

14(Base Program Allocation - $750,000)

 

15(Design & Contingencies - $75,000)

 

16(D) Renovate and expand District 6-0
17District Office to bring building into
18code compliance, upgrade buildings
19systems and improve program
20requirements and energy efficiency

 

21Project Allocation

2,200,000

22(Base Project Allocation - $2,000,000)

 

23(Design & Contingencies - $200,000)

 

24(E) Construction of new salt storage
25buildings and site work at Montgomery
26County Maintenance Facility

 

27Project Allocation

2,000,000

28(Base Project Allocation - $1,750,000)

 

29(Design & Contingencies - $250,000)

 

30(F) Renovate and expand Montgomery County

 

1Driver Licensing Center, including
2roof replacement, building systems
3upgrade, sidewalks, curbing, step
4replacement, parking lot upgrades and
5sewage plant upgrades

 

6Project Allocation

1,400,000

7(Base Project Allocation - $1,250,000)

 

8(Design & Contingencies - $150,000)

 

9(G) Renovate and expand Montgomery County
10Maintenance Garage, including roof
11replacement, building systems upgrade
12and energy efficiency improvement

 

13Project Allocation

1,500,000

14(Base Project Allocation - $1,275,000)

 

15(Design & Contingencies - $225,000)

 

16(xiii.1) Montour County

 

17(A) Demolish and construct new storage
18buildings and site work at various
19stockpiles at Montour County Stockpile
20Facility

 

21Project Allocation

800,000

22(Base Project Allocation - $700,000)

 

23(Design & Contingencies - $100,000)

 

24(B) Renovate and expand Rest Site 35,
25including roof replacement, building
26systems upgrade, sidewalks, curbing,
27step replacement, parking lot upgrades
28and sewage plant upgrades

 

29Project Allocation

2,500,000

30(Base Project Allocation - $2,200,000)

 

1(Design & Contingencies - $300,000)

 

2(C) Renovate and expand Rest Site 36,
3including roof replacement, building
4systems upgrade, sidewalks, curbing,
5step replacement, parking lot upgrades
6and sewage plant upgrades

 

7Project Allocation

2,500,000

8(Base Project Allocation - $2,200,000)

 

9(Design & Contingencies - $300,000)

 

10(xiii.2) Northampton County

 

11(A) Construct new salt storage buildings,
12auxiliary buildings, site work and
13land acquisition at Northampton County
14Maintenance Facility

 

15Project Allocation

15,000,000

16(Base Project Allocation -
17$11,750,000)

 

18(Land Allocation - $1,000,000)

 

19(Design & Contingencies - $2,250,000)

 

20(B) Renovate and expand current
21Northampton County Maintenance Garage,
22including roof replacement and
23building systems upgrade

 

24Project Allocation

2,000,000

25(Base Project Allocation - $1,700,000)

 

26(Design & Contingencies - $300,000)

 

27(C) Construct new salt storage building
28and site work at Northampton County
29Maintenance Garage

 

30Project Allocation

350,000

1(Base Project Allocation - $300,000)

 

2(Design & Contingencies - $50,000)

 

3(xiii.3) Northumberland County

 

4(A) Demolish and construct new storage
5buildings and site work at various
6stockpiles at Northumberland County
7Stockpile Facility

 

8Project Allocation

1,600,000

9(Base Project Allocation - $1,400,000)

 

10(Design & Contingencies - $200,000)

 

11(B) Construct new maintenance garage,
12including salt storage buildings,
13auxiliary buildings, site work and
14land acquisition

 

15Project Allocation

15,000,000

16(Base Project Allocation -
17$11,750,000)

 

18(Land Allocation - $1,000,000)

 

19(Design & Contingencies - $2,250,000)

 

20(C) Renovate and expand Northumberland
21County Maintenance Garage, including
22roof replacement, building systems
23upgrade and energy efficiency
24improvement

 

25Project Allocation

2,000,000

26(Base Project Allocation - $1,700,000)

 

27(Design & Contingencies - $300,000)

 

28(xiv) Perry County

 

29(A) Develop new stockpile facility in
30Perry County, including site purchase,

 

1design and construction

 

2Project Allocation

2,220,000

3(Base Project Allocation - $2,000,000)

 

4(Land Allocation - $20,000)

 

5(Design & Contingencies - $200,000)

 

6(B) Demolish and construct new salt
7storage buildings and site work at
8various stockpiles

 

9Project Allocation

1,200,000

10(Base Project Allocation - $1,050,000)

 

11(Design & Contingencies - $150,000)

 

12(C) Develop new stockpile, including site
13purchase, design and construction

 

14Project Allocation

3,000,000

15(Base Project Allocation - $1,750,000)

 

16(Land Allocation - $750,000)

 

17(Design & Contingencies - $500,000)

 

18(xiv.1) Philadelphia County

 

19(A) Construction of new salt storage
20building at Philadelphia County
21Maintenance Facility

 

22Project Allocation

400,000

23(Base Project Allocation - $350,000)

 

24(Design & Contingencies - $50,000)

 

25(B) Renovate and expand Philadelphia
26County Maintenance Facility, including
27roof replacement and building systems
28upgrade

 

29Project Allocation

2,000,000

30(Base Project Allocation - $1,700,000)

 

1(Design & Contingencies - $300,000)

 

2(C) Demolish and construct new salt
3storage building and site work at
4Philadelphia County Maintenance
5Facility

 

6Project Allocation

400,000

7(Base Project Allocation - $350,000)

 

8(Design & Contingencies - $50,000)

 

9(D) Renovate and expand Philadelphia
10County Driver Licensing Center,
11including roof replacement, building
12systems upgrade, sidewalks, curbing,
13step replacement, parking lot upgrades
14and sewage plant upgrades

 

15Project Allocation

1,400,000

16(Base Project Allocation - $1,250,000)

 

17(Design & Contingencies - $150,000)

 

18(xiv.2) Pike County

 

19(A) Construct new salt storage building
20and site work at Pike County
21Maintenance Facility

 

22Project Allocation

400,000

23(Base Project Allocation - $350,000)

 

24(Design & Contingencies - $50,000)

 

25(B) Renovate and expand Welcome Center
26Site K, including roof replacement,
27building systems upgrade, sidewalks,
28curbing, step replacement, parking lot
29upgrades and sewage plant upgrades

 

30Project Allocation

2,000,000

1(Base Project Allocation - $1,800,000)

 

2(Design & Contingencies - $200,000)

 

3(C) Renovate and expand Rest Site 61,
4including roof replacement, building
5systems upgrade, sidewalks, curbing,
6step replacement, parking lot upgrades
7and sewage plant upgrades

 

8Project Allocation

2,500,000

9(Base Project Allocation - $2,200,000)

 

10(Design & Contingencies - $300,000)

 

11(D) Renovate and expand Rest Site 62,
12including roof replacement, building
13systems upgrade, sidewalks, curbing,
14step replacement, parking lot upgrades
15and sewage plant upgrades

 

16Project Allocation

2,500,000

17(Base Project Allocation - $2,200,000)

 

18(Design & Contingencies - $300,000)

 

19(E) Removal and roof replacement system
20at maintenance facility at Pike County
21Welcome Center

 

22Project Allocation

650,000

23(Base Project Allocation - $600,000)

 

24(Design & Contingencies - $50,000)

 

25(xiv.3) Potter County

 

26(A) Renovate and expand current Potter
27County Maintenance Garage

 

28Project Allocation

2,000,000

29(Base Project Allocation - $1,700,000)

 

30(Design & Contingencies - $300,000)

 

1(B) Demolish and construct two new
2storage buildings and site work at
3Potter County Stockpile Facility

 

4Project Allocation

1,050,000

5(Base Project Allocation - $900,000)

 

6(Design & Contingencies - $150,000)

 

7(xv) Schuylkill County

 

8(A) Renovate and expand Schuylkill County
9Maintenance Garage to upgrade building
10systems and improve program
11requirements and energy efficiency

 

12Project Allocation

1,150,000

13(Base Project Allocation - $1,000,000)

 

14(Design & Contingencies - $150,000)

 

15(B) Renovate and expand current
16Schuylkill County Maintenance Garage,
17including roof replacement and
18building systems upgrade

 

19Project Allocation

1,500,000

20(Base Project Allocation - $1,275,000)

 

21(Design & Contingencies - $225,000)

 

22(C) Construct new salt storage building
23and site work at Schuylkill County
24Maintenance Facility

 

25Project Allocation

400,000

26(Base Project Allocation - $350,000)

 

27(Design & Contingencies - $50,000)

 

28(D) Renovate and expand Schuylkill County
29Driver Licensing Center, including
30roof replacement, building systems

 

1upgrade, sidewalks, curbing, step
2replacement, parking lot upgrades and
3sewage plant upgrades

 

4Project Allocation

1,400,000

5(Base Project Allocation - $1,250,000)

 

6(Design & Contingencies - $150,000)

 

7(xv.1) Snyder County

 

8(A) Demolish and construct new storage
9buildings and site work at various
10stockpiles at Snyder County Stockpile
11Facility

 

12Project Allocation

800,000

13(Base Project Allocation - $700,000)

 

14(Design & Contingencies - $100,000)

 

15(B) Renovate and expand Snyder County
16Driver Licensing Center, including
17roof replacement, building systems
18upgrade, sidewalks, curbing, step
19replacement, parking lot upgrades and
20sewage plant upgrades

 

21Project Allocation

1,400,000

22(Base Project Allocation - $1,250,000)

 

23(Design & Contingencies - $150,000)

 

24(xv.2) Somerset County

 

25(A) Demolish and construct new salt
26storage buildings and site work at
27Somerset County Maintenance Stockpile

 

28Project Allocation

1,200,000

29(Base Project Allocation - $1,050,000)

 

30(Design & Contingencies - $150,000)

 

1(B) Develop new stockpile, including site
2purchase, design and construction

 

3Project Allocation

3,000,000

4(Base Project Allocation - $1,750,000)

 

5(Land Allocation - $750,000)

 

6(Design & Contingencies - $500,000)

 

7(C) Renovate and expand Somerset County
8Maintenance Garage, including roof
9replacement and building systems
10upgrade

 

11Project Allocation

2,500,000

12(Base Project Allocation - $2,125,000)

 

13(Design & Contingencies - $375,000)

 

14(D) Renovate and expand current drivers
15license center, including roof
16replacement, building systems upgrade,
17program requirements improvement,
18sidewalks, curbing, step replacement
19and parking lot upgrades.

 

20Project Allocation

1,400,000

21(Base Project Allocation - $1,250,000)

 

22(Design & Contingencies - $150,000)

 

23(xv.3) Sullivan County

 

24(A) Renovate and expand current Sullivan
25County Maintenance Garage, including
26roof replacement and building systems
27upgrade

 

28Project Allocation

1,500,000

29(Base Project Allocation - $1,275,000)

 

30(Design & Contingencies - $225,000)

 

1(B) Demolish and construct two new
2storage buildings and site work at
3various stockpiles at Sullivan County
4Stockpile Facility

 

5Project Allocation

800,000

6(Base Project Allocation - $700,000)

 

7(Design & Contingencies - $100,000)

 

8(xv.4) Susquehanna County

 

9(A) Renovate and expand current
10Susquehanna County Maintenance
11Facility, including roof replacement
12and building systems upgrade

 

13Project Allocation

2,500,000

14(Base Project Allocation - $2,100,000)

 

15(Design & Contingencies - $400,000)

 

16(B) Reskin metal building at Susquehanna
17County Maintenance Facility

 

18Project Allocation

350,000

19(Base Project Allocation - $300,000)

 

20(Design & Contingencies - $50,000)

 

21(C) Construct new salt storage buildings
22and site work at various stockpiles at
23Susquehanna County Maintenance
24Facility

 

25Project Allocation

800,000

26(Base Project Allocation - $700,000)

 

27(Design & Contingencies - $100,000)

 

28(D) Renovate and expand Rest Site 56,
29including roof replacement, building
30systems upgrade, sidewalks, curbing,

 

1step replacement, parking lot upgrades
2and sewage plant upgrades

 

3Project Allocation

2,500,000

4(Base Project Allocation - $2,200,000)

 

5(Design & Contingencies - $300,000)

 

6(E) Renovate and expand Welcome Center
7Site H, including roof replacement,
8building systems upgrade, sidewalks,
9curbing, step replacement, parking lot
10upgrades and sewage plant upgrades

 

11Project Allocation

2,000,000

12(Base Project Allocation - $1,800,000)

 

13(Design & Contingencies - $200,000)

 

14(xv.5) Tioga County

 

15(A) Renovate and expand current Tioga
16County Maintenance Garage, including
17roof replacement and building systems
18upgrade

 

19Project Allocation

2,500,000

20(Base Project Allocation - $2,125,000)

 

21(Design & Contingencies - $375,000)

 

22(B) Construct new Tioga County
23Maintenance Garage, including salt
24storage buildings, auxiliary
25buildings, site work and land
26acquisition

 

27Project Allocation

15,000,000

28(Base Project Allocation -
29$11,750,000)

 

30(Land Allocation - $1,000,000)

 

1(Design & Contingencies - $2,250,000)

 

2(C) Demolish and construct new storage
3buildings and site work at various
4stockpiles at Tioga County Stockpile
5Facility

 

6Project Allocation

1,200,000

7(Base Project Allocation - $1,050,000)

 

8(Design & Contingencies - $150,000)

 

9(D) Renovate and expand Welcome Center
10Site T, including roof replacement,
11building systems upgrade, sidewalks,
12curbing, step replacement, parking lot
13upgrades and sewage plant upgrades

 

14Project Allocation

2,000,000

15(Base Project Allocation - $1,800,000)

 

16(Design & Contingencies - $200,000)

 

17(xv.6) Union County

 

18(A) Renovate and expand current Union
19County Maintenance Garage, including
20roof replacement and building systems
21upgrade

 

22Project Allocation

2,500,000

23(Base Project Allocation - $2,125,000)

 

24(Design & Contingencies - $375,000)

 

25(B) Demolish and construct new storage
26buildings and site work at various
27stockpiles at Union County Stockpile
28Facility

 

29Project Allocation

400,000

30(Base Project Allocation - $350,000)

 

1(Design & Contingencies - $50,000)

 

2(xv.7) Venango County

 

3(A) Construct new county maintenance
4garage, including salt storage
5buildings, auxiliary buildings, site
6work and acquisition of land at
7Venango County Maintenance Garage

 

8Project Allocation

15,000,000

9(Base Project Allocation -
10$11,750,000)

 

11(Land Allocation - $1,000,000)

 

12(Design & Contingencies - $2,250,000)

 

13(B) Construct parking lot at District
14Office 1-0

 

15Project Allocation

400,000

16(Base Project Allocation - $350,000)

 

17(Design & Contingencies - $50,000)

 

18(C) Demolish and construct new storage
19building and site work at Venango
20County Stockpile Facility

 

21Project Allocation

400,000

22(Base Project Allocation - $350,000)

 

23(Design & Contingencies - $50,000)

 

24(D) Renovate and expand Rest Site 21,
25including roof replacement, building
26systems upgrade, sidewalks, curbing,
27step replacement, parking lot upgrades
28and sewage plan upgrades

 

29Project Allocation

2,500,000

30(Base Project Allocation - $2,200,000)

 

1(Design & Contingencies - $300,000)

 

2(E) Renovate and expand Rest Site 22,
3including roof replacement, building
4systems upgrade, sidewalks, curbing,
5step replacement, parking lot upgrades
6and sewage plan upgrades

 

7Project Allocation

2,500,000

8(Base Project Allocation - $2,200,000)

 

9(Design & Contingencies - $300,000)

 

10(F) Renovate and expand current Venango
11County District Office, including roof
12replacement and building systems
13upgrade

 

14Project Allocation

2,500,000

15(Base Project Allocation - $2,125,000)

 

16(Design & Contingencies - $375,000)

 

17(G) Renovate and expand Venango County
18Driver Licensing Center, including
19roof replacement, building systems
20upgrade, sidewalks, curbing, step
21replacement, parking lot upgrades and
22sewage plan upgrades

 

23Project Allocation

1,400,000

24(Base Project Allocation - $1,250,000)

 

25(Design & Contingencies - $150,000)

 

26(xv.8) Warren County

 

27(A) Demolish and construct new storage
28buildings and site work at various
29stock piles at Warren County Stockpile
30Facility

 

1Project Allocation

1,800,000

2(Base Project Allocation - $1,550,000)

 

3(Design & Contingencies - $250,000)

 

4(B) Renovate and expand Warren County
5Driver Licensing Center, including
6roof replacement, building systems
7upgrade, sidewalks, curbing, step
8replacement, parking lot upgrades and
9sewage plan upgrades

 

10Project Allocation

1,400,000

11(Base Project Allocation - $1,250,000)

 

12(Design & Contingencies - $150,000)

 

13(C) Renovate and expand Warren County
14Maintenance Garage, including roof
15replacement, building systems upgrade
16and energy efficiency improvement

 

17Project Allocation

2,500,000

18(Base Project Allocation - $2,125,000)

 

19(Design & Contingencies - $375,000)

 

20(xvi) Washington County

 

21(A) Develop new stockpile facility,
22including site purchase, design and
23construction

 

24Project Allocation

2,220,000

25(Base Project Allocation - $2,000,000)

 

26(Land Allocation - $20,000)

 

27(Design & Contingencies - $200,000)

 

28(B) Develop new stockpile facility at
29Atlasburg, including site purchase,
30design and construction

 

1Project Allocation

2,220,000

2(Base Project Allocation - $2,000,000)

 

3(Land Allocation - $20,000)

 

4(Design & Contingencies - $200,000)

 

5(C) Demolish and construct new salt
6storage buildings and site work at
7Washington County Maintenance
8Stockpile

 

9Project Allocation

1,200,000

10(Base Project Allocation - $1,050,000)

 

11(Design & Contingencies - $150,000)

 

12(D) Renovate and expand Welcome Center
13Site A, including roof replacement,
14building systems upgrade, sidewalks,
15curbing, step replacement, parking lot
16upgrades and sewage plan upgrades

 

17Project Allocation

2,500,000

18(Base Project Allocation - $2,200,000)

 

19(Design & Contingencies - $300,000)

 

20(xvi.1) Wayne County

 

21(A) Renovate and expand current Wayne
22County Maintenance Facility, including
23roof replacement and building systems
24upgrade

 

25Project Allocation

2,500,000

26(Base Project Allocation - $2,100,000)

 

27(Design & Contingencies - $400,000)

 

28(B) Reskin metal building at Wayne County
29Maintenance Facility

 

30Project Allocation

350,000

1(Base Project Allocation - $300,000)

 

2(Design & Contingencies - $50,000)

 

3(C) Construct new salt storage buildings
4and site work at various stockpiles at
5Wayne County Maintenance Facility

 

6Project Allocation

800,000

7(Base Project Allocation - $700,000)

 

8(Design & Contingencies - $100,000)

 

9(xvi.2) Westmoreland County

 

10(A) Construct new salt storage building
11at Westmoreland County Maintenance
12Facility

 

13Project Allocation

400,000

14(Base Project Allocation - $380,000)

 

15(Design & Contingencies - $20,000)

 

16(B) Construct retaining wall at Latrobe
17Stockpile

 

18Project Allocation

325,000

19(Base Project Allocation - $300,000)

 

20(Design & Contingencies - $25,000)

 

21(C) Purchase additional property for
22expansion of Westmoreland County
23Maintenance Garage

 

24Project Allocation

1,000,000

25(Land Allocation - $1,000,000)

 

26(D) Rehabilitate and expand 12-5
27Maintenance Facility, including
28infrastructure

 

29Project Allocation

3,000,000

30(Base Project Allocation - $2,650,000)

 

1(Design & Contingencies - $350,000)

 

2(E) Demolish and construct new salt
3storage buildings and site work at
4Westmoreland County Maintenance
5Stockpile

 

6Project Allocation

2,400,000

7(Base Project Allocation - $2,100,000)

 

8(Design & Contingencies - $300,000)

 

9(xvi.3) Wyoming County

 

10(A) Renovate and expand current Wyoming
11County Maintenance Facility, including
12roof replacement and building systems
13upgrade

 

14Project Allocation

2,500,000

15(Base Project Allocation - $2,100,000)

 

16(Design & Contingencies - $400,000)

 

17(xvii) York County

 

18(A) Develop a new stockpile facility,
19including site purchase, design and
20construction

 

21Project Allocation

2,220,000

22(Base Project Allocation - $2,000,000)

 

23(Land Allocation - $20,000)

 

24(Design & Contingencies - $200,000)

 

25(B) Construct new vehicle wash building
26at York County Maintenance Garage

 

27Project Allocation

690,000

28(Base Project Allocation - $600,000)

 

29(Design & Contingencies - $90,000)

 

30(C) Develop new maintenance garage,

 

1including site purchase, design and
2construction

 

3Project Allocation

5,000,000

4(Base Project Allocation - $3,000,000)

 

5(Land Allocation - $1,500,000)

 

6(Design & Contingencies - $500,000)

 

7(D) Renovate and expand current York
8County Maintenance Garage, including
9roof replacement and building systems
10upgrade

 

11Project Allocation

2,000,000

12(Base Project Allocation - $1,700,000)

 

13(Design & Contingencies - $300,000)

 

14(E) Demolish and construct new salt
15storage buildings and site work at
16York County Maintenance Stockpile

 

17Project Allocation

3,200,000

18(Base Project Allocation - $2,800,000)

 

19(Design & Contingencies - $400,000)

 

20(F) Develop new stockpile, including site
21purchase, design and construction

 

22Project Allocation

3,000,000

23(Base Project Allocation - $1,750,000)

 

24(Land Allocation - $750,000)

 

25(Design & Contingencies - $500,000)

 

26(G) Construct new welcome center,
27including auxiliary buildings, site
28work and site acquisition

 

29Project Allocation

10,000,000

30(Base Project Allocation - $7,500,000)

 

1(Land Allocation - $1,000,000)

 

2(Design & Contingencies - $1,500,000)

 

3(H) Renovate and expand Welcome Center
4Site J, including roof replacement,
5building systems upgrade, sidewalks,
6curbing, step replacement, parking lot
7upgrades and sewage plan upgrades

 

8Project Allocation

2,000,000

9(Base Project Allocation - $1,800,000)

 

10(Design & Contingencies - $200,000)

 

11(xviii) Montgomery and Philadelphia Counties

 

12(A) City Avenue Special Services
13District. Construction, infrastructure
14improvements and other related costs
15on City Avenue for pedestrian and
16vehicular hazard mitigation and storm
17water management in Lower Merion and
18the City of Philadelphia

 

19Project Allocation

10,000,000

20(Base Project Allocation -
21$10,000,000)

 

22(b) Port projects.--Additional capital projects in the
23category of improvement projects for ports to be constructed or
24acquired by the Department of Transportation, its successors or
25assigns, and to be financed by the incurring of debt, are hereby
26itemized, together with their respective estimated financial
27costs, as follows:

28 

29Project

Total Project

Allocation

30(1) Erie County

 

1(i) Erie Inland Port

 

2(A) Construct rail improvements and ship
3loading infrastructure at the Port of
4Erie

 

5Project Allocation

9,000,000

6(Base Project Allocation - $9,000,000)

 

7(B) Construct rail improvements and
8replace rail bridge at Erie Inland
9Port-Albion site

 

10Project Allocation

12,000,000

11(Base Project Allocation -
12$12,000,000)

 

<-13(2) Philadelphia County

 

14(i) Philadelphia Regional Port Authority

 

15(A) Land acquisition, expansion, design,
16construction and general improvements
17to port facilities

 

18Project Allocation

493,200,000

19(Base Project Allocation -
20$493,200,000)

 

21(B) Main channel deepening project

 

22Project Allocation

97,800,000

23(Base Project Allocation -
24$97,800,000)

 

25Section 4. Itemization of furniture and equipment projects.

26Additional capital projects in the category of public
27improvement projects consisting of the acquisition of movable
28furniture and equipment to complete public improvement projects
29and to be purchased by the Department of General Services, its
30successor or assigns and to be financed by the incurring of debt

1are hereby itemized, together with their respective estimated
2financial costs, as follows:

3 

4Project

Total Project

Allocation

5(1) Department of Conservation and Natural
6Resources

 

7(i) Kinzua Bridge State Park

 

8(A) Original furniture and equipment for
9new office/visitor center for public
10and staff use

 

11Project Allocation

3,000,000

12(Base Project Allocation - $2,400,000)

 

13(Design & Contingencies - $600,000)

 

14(ii) Ohiopyle State Park

 

15(A) Original furniture and equipment for
16Project DGS 166-9, Ohiopyle State Park
17Visitors' Center

 

18Project Allocation

220,000

19(Base Project Allocation - $220,000)

 

20(iii) S. B. Elliott State Park

 

21(A) Additional funding for purchase of
22exhibits, furnishings and equipment
23for visitor center and overnight
24facilities

 

25Project Allocation

3,500,000

26(Base Project Allocation - $2,800,000)

 

27(Design & Contingencies - $700,000)

 

28(iv) Sinnemahoning State Park

 

29(A) Purchase of exhibits, furnishings and
30equipment for visitor center and

 

1office

 

2Project Allocation

2,000,000

3(Base Project Allocation - $1,600,000)

 

4(Design & Contingencies - $400,000)

 

5(2) Department of Education

 

6(i) Lincoln University

 

7(A) Original furniture and equipment
8associated with renovation of Center
9for the Study of Black Culture

 

10Project Allocation

4,000,000

11(Base Project Allocation - $3,200,000)

 

12(Design & Contingencies - $800,000)

 

13(B) Provide necessary furniture and
14equipment associated with renovation
15of Alumni House

 

16Project Allocation

5,000,000

17(Base Project Allocation - $4,000,000)

 

18(Design & Contingencies - $1,000,000)

 

19(ii) Temple University

 

20(A) Original furniture and equipment
21associated with renovation of
22Tomlinson Hall

 

23Project Allocation

450,000

24(Base Project Allocation - $360,000)

 

25(Design & Contingencies - $90,000)

 

26(B) Original furniture and equipment
27associated with design and
28construction of Center for Scholars

 

29Project Allocation

300,000

30(Base Project Allocation - $300,000)

 

1(iii) Thaddeus Stevens College of Technology

 

2(A) Original furniture and equipment
3associated with design and
4construction of technology center

 

5Project Allocation

2,000,000

6(Base Project Allocation - $2,000,000)

 

7(iv) The Pennsylvania State University

 

8(A) Original furniture and equipment for
9state-of-the-art research and teaching
10space for College of Liberal Arts

 

11Project Allocation

8,100,000

12(Base Project Allocation - $8,100,000)

 

13(B) Original furniture and equipment for
14building entrance and security systems
15project, including key access boxes
16and video surveillance cameras

 

17Project Allocation

1,500,000

18(Base Project Allocation - $1,500,000)

 

19(C) Original furniture and equipment for
20chilled water expansion project for
21University Park campus

 

22Project Allocation

1,000,000

23(Base Project Allocation - $1,000,000)

 

24(D) Original furniture and equipment for
25new classroom/class lab building at
26University Park campus

 

27Project Allocation

7,700,000

28(Base Project Allocation - $7,700,000)

 

29(E) Additional funding for furniture and
30equipment for computer building at

 

1University Park campus

 

2Project Allocation

1,500,000

3(Base Project Allocation - $1,500,000)

 

4(F) Original furniture and equipment for
5general computing Tier III<- data center

 

6Project Allocation

13,000,000

7(Base Project Allocation -
8$13,000,000)

 

9(G) Additional funding for furniture and
10equipment for Henning Building

 

11Project Allocation

2,250,000

12(Base Project Allocation - $2,250,000)

 

13(H) Capital renewal for Kostos Building

 

14Project Allocation

1,800,000

15(Base Project Allocation - $1,800,000)

 

16(I) Capital renewal for Baker Engineering
17& Science Building

 

18Project Allocation

1,400,000

19(Base Project Allocation - $1,400,000)

 

20(J) Original furniture and equipment for
21new Recital Hall addition and Music I

 

22Project Allocation

3,300,000

23(Base Project Allocation - $3,300,000)

 

24(K) Original furniture and equipment for
25Ruhl Student/Community Center and
26multipurpose building upgrades

 

27Project Allocation

1,600,000

28(Base Project Allocation - $1,600,000)

 

29(L) Original furniture and equipment for
30Student Union Building at Brandywine

 

1Project Allocation

2,400,000

2(Base Project Allocation - $2,400,000)

 

3(M) Capital renewal for waste water
4treatment plant located at University
5Park campus

 

6Project Allocation

1,000,000

7(Base Project Allocation - $1,000,000)

 

8(N) Additional funding for furniture and
9equipment for water treatment plant
10located at University Park campus

 

11Project Allocation

1,000,000

12(Base Project Allocation - $1,000,000)

 

13(O) Original furniture and equipment for
14Pattee Library Knowledge Commons at
15University Park

 

16Project Allocation

1,500,000

17(Base Project Allocation - $1,500,000)

 

18(P) Provide for necessary furniture and
19equipment associated with design and
20construction of Milton S. Hershey Data
21Center

 

22Project Allocation

2,400,000

23(Base Project Allocation - $2,400,000)

 

<-24(Q) Original furniture and equipment for
25state-of-the-art research and teaching
26space for College of Agricultural
27Sciences.

 

28Project Allocation

12,000,000

29(Base Project Allocation -
30$12,000,000)

 

<-1(R) Original furniture and equipment for
2state-of-the-art research and teaching
3space for College of Engineering

 

4Project Allocation

15,000,000

5(Base Project Allocation -
6$15,000,000)

 

7(2.1) Department of General Services

 

8(i) Family Court Complex, Philadelphia

 

9(A) Provide the necessary furniture and
10equipment associated with construction
11of Family Court Complex in
12Philadelphia

 

13Project Allocation

22,000,000

14(Base Project Allocation -
15$22,000,000)

 

16(3) Pennsylvania Historical and Museum
17Commission

 

18(i) Landis Valley Village and Museum

 

19(A) Original furniture and equipment for
20new visitor center

 

21Project Allocation

1,500,000

22(Base Project Allocation - $1,500,000)

 

23(ii) Railroad Museum of Pennsylvania

 

24(A) Original equipment for new rolling
25stock storage facility

 

26Project Allocation

1,200,000

27(Base Project Allocation - $1,200,000)

 

28(iii) Southeastern Veterans Center, Chester
29County

 

30(A) Provide original furniture and

 

1equipment to fully equip new
2maintenance building

 

3Project Allocation

200,000

4(Base Project Allocation - $200,000)

 

5(4) State System of Higher Education

 

6(i) Bloomsburg University

 

7(A) Original furniture and equipment
8associated with renovation of
9McCormick Center

 

10Project Allocation

2,500,000

11(Base Project Allocation - $2,500,000)

 

12(ii) California University of Pennsylvania

 

13(A) Original furniture and equipment
14associated with renovation of Coover
15Hall

 

16Project Allocation

2,000,000

17(Base Project Allocation - $2,000,000)

 

18(B) Original furniture and equipment
19associated with renovation of South
20Hall and Old Main

 

21Project Allocation

3,500,000

22(Base Project Allocation - $3,500,000)

 

23(iii) Cheyney University

 

24(A) Original furniture and equipment
25associated with renovation of Cope
26Hall

 

27Project Allocation

5,000,000

28(Base Project Allocation - $5,000,000)

 

29(iv) Clarion University

 

30(A) Original furniture and equipment

 

1associated with renovation of Marwick-
2Boyd Fine Arts Center

 

3Project Allocation

4,000,000

4(Base Project Allocation - $4,000,000)

 

5(v) East Stroudsburg University

 

6(A) Original furniture and equipment
7associated with construction of
8Information Commons

 

9Project Allocation

8,000,000

10(Base Project Allocation - $8,000,000)

 

<-11(vi) Edinboro University

 

12(A) Original furniture and equipment
13associated with renovation and
14addition of Porreco Center

 

15Project Allocation

500,000

16(Base Project Allocation - $500,000)

 

17(vi) <-(vii) Indiana University of Pennsylvania

 

18(A) Original furniture and equipment
19associated with renovation of
20Stapleton/Stabley Library

 

21Project Allocation

5,000,000

22(Base Project Allocation - $5,000,000)

 

23(B) Provide for necessary furniture and
24equipment associated with renovation
25of Weyant/Walsh Halls

 

26Project Allocation

2,000,000

27(Base Project Allocation - $2,000,000)

 

28(vii) <-(viii) Kutztown University

 

29(A) Original furniture and equipment
30associated with renovation of Lytle

 

1Hall

 

2Project Allocation

3,000,000

3(Base Project Allocation - $3,000,000)

 

4(B) Original furniture and equipment
5associated with renovation of Poplar
6House

 

7Project Allocation

1,000,000

8(Base Project Allocation - $1,000,000)

 

9(viii) <-(ix) Mansfield University

 

10(A) Original furniture and equipment
11associated with construction of new
12student housing

 

13Project Allocation

2,000,000

14(Base Project Allocation - $2,000,000)

 

15(ix) <-(x) Slippery Rock University

 

16(A) Original furniture and equipment
17associated with renovation of Student
18Success Center

 

19Project Allocation

2,800,000

20(Base Project Allocation - $2,800,000)

 

21Section 5. Itemization of transportation assistance projects.

22(a) Mass transit.--Additional capital projects in the
23category of transportation assistance projects for mass transit
24in which an interest is to be acquired or constructed by the
25Department of Transportation, its successors or assigns and to
26be financed by the incurring of debt are hereby itemized,
27together with their estimated financial costs, as follows:

28 

29Project

Total Project

Allocation

<-30(1) Adams County Transit Authority

 

1(i) Design, construction and other related
2costs for multimodal transportation
3facility for Freedom Transit, ACTA Para-
4transit, intercity buses, automobiles and
5bicycles to provide off-street parking for
6both public and private users, as well as
7to accommodate overflow parking from the
8Gettysburg National Military Park, Borough
9of Gettysburg

 

10Project Allocation

3,000,000

11(Base Project Allocation - $3,000,000)

 

12(1) <-(1.1) Allegheny County

 

13(i) High-density redevelopment at new and
14existing transit stops along proposed Bus
15Rapid Transit Route and Lightrail and
16Busway stops in City of Pittsburgh

 

17Project Allocation

20,000,000

18(Base Project Allocation -
19$20,000,000)

 

<-20(ii) Acquisition, construction,
21infrastructure, redevelopment and other
22related costs for multimodal public
23transportation facility

 

24Project Allocation

5,000,000

25(Base Project Allocation - $5,000,000)

 

26(2) Area Transportation Authority

 

27(i) Provide for facility and facility
28upgrades, including mobility management
29center, terminals, fuel storage, parking
30lots, fueling depots, roof replacement and

 

1miscellaneous equipment

 

2Project Allocation

2,253,000

3(Base Project Allocation - $2,028,000)

 

4(Design & Contingencies - $225,000)

 

5(ii) Upgrade and renovate Dubois facility to
6bring to state of good repair

 

7Project Allocation

959,000

8(Base Project Allocation - $863,000)

 

9(Design & Contingencies - $96,000)

 

10(iii) Construct terminals

 

11Project Allocation

1,162,000

12(Base Project Allocation - $1,162,000)

 

13(iv) Mobility Management Center, to match
14discretionary Federal capital funding to
15rehabilitate infrastructure throughout
16system

 

17Project Allocation

1,066,000

18(Base Project Allocation - $959,000)

 

19(Design & Contingencies - $107,000)

 

20(v) Bus Purchase Program, provide for
21replacement of buses that have exceeded
22their useful life

 

23Project Allocation

2,464,000

24(Base Project Allocation - $2,218,000)

 

25(Design & Contingencies - $246,000)

 

<-26(2.1) Beaver County Transit Authority

 

27(i) Construction, infrastructure and other
28related costs for natural gas fueling
29station in Center Township

 

30Project Allocation

2,000,000

1(Base Project Allocation - $2,000,000)

 

2(3) Butler Transit Authority

 

3(i) Expand Cranberry Area Park and Ride
4Facility on Route 528 near I-79, Butler
5County, including property acquisition and
6construction

 

7Project Allocation

450,000

8(Base Project Allocation - $405,000)

 

9(Design & Contingencies - $45,000)

 

10(ii) Provide for infrastructure improvements,
11facility upgrades for bus storage and
12maintenance areas, construction of public
13waiting area, training room, park and ride
14facility and compressed natural gas (CNG)
15refueling station and purchase of four 45-
16foot Coach CNG buses.

 

17Project Allocation

1,700,000

18(Base Project Allocation - $1,700,000)

 

19(4) Cambria County Transit Authority

 

20(i) Replace transit facility in Johnstown to
21meet current standards and requirements

 

22Project Allocation

2,419,000

23(Base Project Allocation - $2,177,000)

 

24(Design & Contingencies - $242,000)

 

25(ii) Construct transit facility

 

26Project Allocation

3,871,000

27(Base Project Allocation - $3,871,000)

 

28(iii) Construction and infrastructure
29improvements for new facility and bus
30replacement projects for Camtran

 

1Project Allocation

7,000,000

2(Base Project Allocation - $7,000,000)

 

3(iv) Replace track ties and other
4improvements

 

5Project Allocation

271,000

6(Base Project Allocation - $244,000)

 

7(Design & Contingencies - $27,000)

 

8(v) Replace fare collection system

 

9Project Allocation

78,000

10(Base Project Allocation - $70,000)

 

11(Design & Contingencies - $8,000)

 

12(5) Capital Area Transit Authority

 

13(i) Replace CAT's transit facility to meet
14modern requirements

 

<-15Project Allocation

7,742,000

16(Base Project Allocation - $6,968,000)

 

17(Design & Contingencies - $774,000)

 

<-18Project Allocation

47,742,000

19(Base Project Allocation -
20$42,968,000)

 

21(Design & Contingencies - $4,774,000)

 

22(ii) Upgrade transportation technology for
23vehicle monitoring and real-time
24information for CAT's transit operations

 

25Project Allocation

1,935,000

26(Base Project Allocation - $1,742,000)

 

27(Design & Contingencies - $193,000)

 

28(6) Centre Area Transportation Authority

 

29(i) Expand CATA's maintenance and bus storage
30areas

 

1Project Allocation

968,000

2(Base Project Allocation - $871,000)

 

3(Design & Contingencies - $97,000)

 

4(ii) Acquisition of replacement buses

 

5Project Allocation

1,600,000

6(Base Project Allocation - $1,600,000)

 

7(iii) Rehabilitate or replace various
8facilities and infrastructure

 

9Project Allocation

30,000,000

10(Base Project Allocation -
11$24,000,000)

 

12(Design & Contingencies - $6,000,000)

 

13(iv) Acquisition of compressed natural gas
14(CNG) buses

 

15Project Allocation

5,700,000

16(Base Project Allocation - $5,700,000)

 

<-17(6.1) Chester County

 

18(i) Acquisition, construction and related
19costs of Darby Road extension and Paoli
20Transit Center projects in Tredyffrin
21Township

 

22Project Allocation

30,000,000

23(Base Project Allocation -
24$30,000,000)

 

25(7) County of Lackawanna Transit System

 

26(i) Acquisition, construction, infrastructure
27and other costs related to compressed
28natural gas fueling station and
29maintenance facility

 

30Project Allocation

6,000,000

1(Base Project Allocation - $6,000,000)

 

2(ii) Acquisition, construction,
3infrastructure and other costs related to
4intermodal transportation center

 

5Project Allocation

1,000,000

6(Base Project Allocation - $1,000,000)

 

7(8) Crawford Area Transportation Authority

 

8(i) Construct steel structure sheltered bus
9storage facility and wash bay for bus
10fleet

 

11Project Allocation

387,000

12(Base Project Allocation - $348,000)

 

13(Design & Contingencies - $39,000)

 

14(9) Erie Metropolitan Transit Authority

 

15(i) Construct new operations facility,
16including infrastructure

 

17Project Allocation

1,796,000

18(Base Project Allocation - $1,616,000)

 

19(Design & Contingencies - $180,000)

 

20(9.1) Lebanon Transit

 

21(i) Rehabilitate building and grounds,
22including maintenance garage roof

 

23Project Allocation

406,000

24(Base Project Allocation - $365,000)

 

25(Design & Contingencies - $41,000)

 

26(10) Lehigh and Northampton Transportation
27Authority

 

28(i) Construct new operations facility,
29including infrastructure at Allentown
30operating facility

 

1Project Allocation

2,517,000

2(Base Project Allocation - $2,265,000)

 

3(Design & Contingencies - $252,000)

 

4(ii) Transit vehicle purchase, provide
5funding for purchase of transit buses

 

6Project Allocation

1,646,000

7(Base Project Allocation - $1,481,000)

 

8(Design & Contingencies - $165,000)

 

<-9(10.1) Lycoming County

 

10(i) Construction, infrastructure and other
11related costs for replacing existing cast
12in place culvert which carries Lawshee Run
13under several borough streets and
14sidewalks, including repairs to streets
15and replacement of sidewalks in Jersey
16Shore Borough

 

17Project Allocation

2,800,000

18(Base Project Allocation - $2,800,000)

 

19(11) Mid-County Transit Authority

 

20(i) Construct bus storage facility

 

21Project Allocation

215,000

22(Base Project Allocation - $215,000)

 

23(12) Mid Mon Valley Transit Authority

 

24(i) Rehabilitate bus storage, phase II,
25including construction to rehabilitate
26existing bus storage, administration and
27passenger areas at Donora transit facility

 

28Project Allocation

1,160,000

29(Base Project Allocation - $1,044,000)

 

30(Design & Contingencies - $116,000)

 

1(ii) Construct Donora Phase II project

 

2Project Allocation

965,000

3(Base Project Allocation - $965,000)

 

4(iii) Replace revenue rolling stock that has
5outlived its useful life as part of Phase
6II of rehabilitation of Donora Transit
7Facility

 

8Project Allocation

364,000

9(Base Project Allocation - $328,000)

 

10(Design & Contingencies - $36,000)

 

11(13) Monroe County Transit Agency

 

12(i) Construct new bus storage facility and
13staging area

 

14Project Allocation

968,000

15(Base Project Allocation - $871,000)

 

16(Design & Contingencies - $97,000)

 

17(14) Montgomery County

 

18(i) Construction, infrastructure improvements
19and other costs related to expansion of
20Ardmore Train Station transit and parking
21improvements project

 

22Project Allocation

10,000,000

23(Base Project Allocation -
24$10,000,000)

 

<-25(14.1) Northampton County

 

26(i) Installation of traffic light at
27intersection of Polk Valley Road and Route
28412 in Lower Saucon Township

 

29Project Allocation

450,000

30(Base Project Allocation - $450,000)

 

1(15) Philadelphia County

 

2(i) Infrastructure improvements, including
3equipment upgrades for Phlash Trolley
4fleet

 

5Project Allocation

235,000

6(Base Project Allocation - $235,000)

 

7(16) Port Authority of Allegheny County

 

8(i) FY 2011-2012 Section 5307 Program,
9replacement and rehabilitation of major
10components of bus and fixed guideway
11system

 

12Project Allocation

7,341,000

13(Base Project Allocation - $6,607,000)

 

14(Design & Contingencies - $734,000)

 

15(ii) FY 2011-2012 Section 5309 Program,
16replacement and rehabilitation of major
17components within Port Authority's rail
18and busway system, including North Shore
19Connector project

 

20Project Allocation

6,000,000

21(Base Project Allocation - $5,400,000)

 

22(Design & Contingencies - $600,000)

 

23(iii) FY 2011-2012 Section 5307 Flex Program,
24to provide funding of replacement buses
25and standardize bus procurement program

 

26Project Allocation

1,493,000

27(Base Project Allocation - 1,344,000)

 

28(Design & Contingencies - 149,000)

 

29(iv) FY 2011-2012 Section 5309 Bus and Bus
30Facilities Program, utilization of bus and

 

1bus facilities earmarks to perform various
2bus upgrades and facility improvements

 

3Project Allocation

1,161,000

4(Base Project Allocation - $1,045,000)

 

5(Design & Contingencies - $116,000)

 

6(v) Infrastructure Safety Renewal Program, to
7restore PAAC's transit and railroad
8infrastructure, including maintenance
9support facilities

 

10Project Allocation

16,000,000

11(Base Project Allocation -
12$14,400,000)

 

13(Design & Contingencies - $1,600,000)

 

14(vi) Vehicle Overhaul Program

 

15Project Allocation

7,419,000

16(Base Project Allocation - $6,678,000)

 

17(Design & Contingencies - $741,000)

 

18(vii) FY 2011-2012 Section 5307 Program, for
19replacement and rehabilitation of major
20components of bus and fixed guideway
21system

 

22Project Allocation

13,706,000

23(Base Project Allocation -
24$12,335,000)

 

25(Design & Contingencies - $1,371,000)

 

26(viii) FY 2011-2012 Section 5309 Program, for
27replacement and rehabilitation of major
28components within Port Authority's rail
29and busway system to ensure safety and
30reliability, including North Shore

 

1Connector project

 

2Project Allocation

11,756,000

3(Base Project Allocation -
4$10,580,000)

 

5(Design & Contingencies - $1,176,000)

 

6(ix) FY 2011-2012 Section 5307 Flex Program,
7to provide funding for match of Federal
8and local funding

 

9Project Allocation

1,493,000

10(Base Project Allocation - $1,344,000)

 

11(Design & Contingencies - $149,000)

 

12(x) FY 2011-2012 Section 5309 Bus and Bus
13Facilities Program, to provide for
14utilization of bus and bus facilities
15earmarks to perform various bus upgrades
16and facility improvements

 

17Project Allocation

1,403,000

18(Base Project Allocation - $1,263,000)

 

19(Design & Contingencies - $140,000)

 

20(xi) Infrastructure Safety Renewal Program,
21to provide funding to restore PAAC's
22transit and railroad infrastructure,
23including maintenance support facilities

 

24Project Allocation

45,484,000

25(Base Project Allocation -
26$41,000,000)

 

27(Design & Contingencies - $4,484,000)

 

28(xii) Vehicle Overhaul Program, to provide
29for PAAC's major overhaul of rolling stock

 

30Project Allocation

5,000,000

1(Base Project Allocation - $4,500,000)

 

2(Design & Contingencies - $500,000)

 

3(xiii) Section 5307 Program, to match
4discretionary Federal capital and local
5funding for replacement of major
6components of bus and fixed guideway
7systems

 

8Project Allocation

4,723,000

9(Base Project Allocation - $4,251,000)

 

10(Design & Contingencies - $472,000)

 

11(xiv) Section 5309 Program, to match Federal
12capital funds to replace buses and
13rehabilitate various facilities and
14infrastructure

 

15Project Allocation

678,000

16(Base Project Allocation - $610,000)

 

17(Design & Contingencies - $68,000)

 

18(xv) Section 5307 Program, to match
19discretionary Federal capital funding to
20purchase 70 replacement buses annually

 

21Project Allocation

1,493,000

22(Base Project Allocation - $1,344,000)

 

23(Design & Contingencies - $149,000)

 

24(xvi) Federal Grant Program, to match
25discretionary Federal capital and local
26funding to rehabilitate or replace
27existing facilities and infrastructure

 

28Project Allocation

5,601,000

29(Base Project Allocation - $5,041,000)

 

30(Design & Contingencies - $560,000)

 

1(16.1) Red Rose Transit Authority

 

2(i) Purchase buses, to provide for
3replacement of buses

 

4Project Allocation

1,887,000

5(Base Project Allocation - $1,698,000)

 

6(Design & Contingencies - $189,000)

 

7(17) River Valley Transit

 

8(i) Expand Trade and Transit Center and
9Church Street Transportation Intermodal
10Center

 

11Project Allocation

1,161,000

12(Base Project Allocation - $1,045,000)

 

13(Design & Contingencies - $116,000)

 

14(ii) Expand Trade and Transit Center

 

15Project Allocation

1,459,000

16(Base Project Allocation - $1,313,000)

 

17(Design & Contingencies - $146,000)

 

18(iii) Construct compressed natural gas
19fueling station and purchase four CNG
20transit vehicles

 

21Project Allocation

1,042,000

22(Base Project Allocation - $937,800)

 

23(Design & Contingencies - $104,200)

 

24(18) Southeastern Pennsylvania Transportation
25Authority

 

26(i) FFY 2012 Section 5307 Formula Program of
27Prospects, including state of good repair,
28vehicle overhaul, regional rail signal
29mechanization, system improvements, bus
30purchase and paratransit vehicle purchase

 

1programs

 

2Project Allocation

23,831,000

3(Base Project Allocation -
4$21,448,000)

 

5(Design & Contingencies - $2,383,000)

 

6(ii) FFY 2012 Section 5309 Rail Modernization
7Program, including state of good repair,
8vehicle overhaul, regional rail signal
9mechanization, system improvements,
10transit and regional rail station and
11station accessibility programs

 

12Project Allocation

24,170,000

13(Base Project Allocation -
14$21,753,000)

 

15(Design & Contingencies - $2,417,000)

 

16(iii) FFY 2012 Bus Purchase Program,
17including acquisition and replacement of
18buses

 

19Project Allocation

4,133,000

20(Base Project Allocation - $3,720,000)

 

21(Design & Contingencies - $413,000)

 

22(iv) FFY 2012 Federal Highway Flex Program,
23including funds for SEPTA's
24railroad/highway grade crossings and for
25CMAQ projects that help meet requirements
26of the Clean Air Act

 

27Project Allocation

774,000

28(Base Project Allocation - $697,000)

 

29(Design & Contingencies - $77,000)

 

30(v) Federal Competitive Grant Program, to

 

1provide for State funds to match Federal
2capital funding awarded through
3competitive grant programs

 

4Project Allocation

15,839,000

5(Base Project Allocation -
6$14,255,000)

 

7(Design & Contingencies - $1,584,000)

 

8(vi) FY 2012-2013 State of Good Repair
9Program, to bring transit and railroad
10facilities to a state of good repair,
11including communications, track right-of-
12way, station facilities, environmental
13concerns and bridges

 

14Project Allocation

24,174,000

15(Base Project Allocation -
16$21,755,000)

 

17(Design & Contingencies - $2,419,000)

 

18(vii) Infrastructure Safety Renewal Program,
19to restore SEPTA's transit and railroad
20infrastructure, including maintenance
21support facilities

 

22Project Allocation

31,936,000

23(Base Project Allocation -
24$28,742,000)

 

25(Design & Contingencies - $3,194,000)

 

26(viii) FY 2011-2012 Vehicle Overhaul Program

 

27Project Allocation

53,226,000

28(Base Project Allocation -
29$47,903,000)

 

30(Design & Contingencies - $5,323,000)

 

1(ix) FFY 2013 Formula Program of Projects, to
2provide for SEPTA's State funds to match
3Federal capital funding to replace buses
4and rehabilitate various facilities and
5infrastructure to bring to state of good
6repair

 

7Project Allocation

23,226,000

8(Base Project Allocation -
9$20,903,000)

 

10(Design & Contingencies - $2,323,000)

 

11(x) FFY 2013 Rail Modernization Program, to
12provide for SEPTA's state of good repair
13program, vehicle overhaul program,
14regional rail signal mechanization, system
15improvements program, transit and regional
16rail station program and station
17accessibility program

 

18Project Allocation

23,226,000

19(Base Project Allocation -
20$20,903,000)

 

21(Design & Contingencies - $2,323,000)

 

22(xi) FFY 2013 Bus Purchase Program, to
23provide for acquisition and replacement of
24buses for SEPTA services

 

25Project Allocation

4,133,000

26(Base Project Allocation - $3,720,000)

 

27(Design & Contingencies - $413,000)

 

28(xii) Federal Competitive Grant Program, to
29provide for State funds to match Federal
30capital funding awarded through

 

1competitive grant programs by improving
2air quality and removing congestion

 

3Project Allocation

17,420,000

4(Base Project Allocation -
5$15,678,000)

 

6(Design & Contingencies - $1,742,000)

 

7(xiii) Federal Competitive Clean Fuel
8Program, to provide for State funds to
9match discretionary Federal capital
10funding to replace existing vehicles with
11clean fuel vehicles to bring to state of
12good repair

 

13Project Allocation

1,452,000

14(Base Project Allocation - $1,307,000)

 

15(Design & Contingencies - $145,000)

 

16(xiv) FY 2013-2014 Safety Renewal Program, to
17provide funds to rehabilitate or replace
18existing facilities and infrastructure to
19bring to state of good repair

 

20Project Allocation

33,872,000

21(Base Project Allocation -
22$30,485,000)

 

23(Design & Contingencies - $3,387,000)

 

24(xv) FY 2013-2014 State of Good Repair
25Program, to provide funds to rehabilitate
26or replace existing facilities and
27infrastructure to bring to state of good
28repair

 

29Project Allocation

19,356,000

30(Base Project Allocation -

 

1$17,420,000)

 

2(Design & Contingencies - $1,936,000)

 

3(xvi) Vehicle Overhaul Program, to provide
4for SEPTA's 2013-2014 Vehicle Overhaul
5Program which provides for major overhaul
6of rolling stock

 

7Project Allocation

53,227,000

8(Base Project Allocation -
9$47,904,000)

 

10(Design & Contingencies - $5,323,000)

 

11(xvii) FY 2012-2013 State of Good Repair
12Program, to provide funds to rehabilitate
13or replace existing facilities and
14infrastructure to bring to state of good
15repair

 

16Project Allocation

24,194,000

17(Base Project Allocation -
18$21,775,000)

 

19(Design & Contingencies - $2,419,000)

 

20(xviii) Infrastructure Safety Renewal
21Program, to provide for restoration of
22SEPTA's transit and railroad
23infrastructure, including maintenance
24support facilities

 

25Project Allocation

31,936,000

26(Base Project Allocation -
27$28,742,000)

 

28(Design & Contingencies - $3,194,000)

 

29(xix) Vehicle Overhaul Program, to provide
30for SEPTA's 2012-2013 Vehicle Overhaul

 

1Program which provides for major overhaul
2of rolling stock

 

3Project Allocation

53,227,000

4(Base Project Allocation -
5$47,904,000)

 

6(Design & Contingencies - $5,323,000)

 

7(xx) FY 2012-2013 Infrastructure Safety
8Renewal Program, to provide for
9restoration of SEPTA's transit and
10railroad infrastructure, including
11maintenance support facilities

 

12Project Allocation

31,936,000

13(Base Project Allocation -
14$28,742,000)

 

15(Design & Contingencies - $3,194,000)

 

16(xxi) Commuter rail expansion project, Phase
171 -- Elwyn to Wawa

 

18Project Allocation

16,500,000

19(Base Project Allocation -
20$15,000,000)

 

21(Design & Contingencies - $1,500,000)

 

22(xxii) Commuter rail expansion project, Phase
232 -- Wawa to West Chester

 

24Project Allocation

16,500,000

25(Base Project Allocation -
26$15,000,000)

 

27(Design & Contingencies - $1,500,000)

 

28(xxiii) Urbanized Area of Formula Program, to
29match Federal capital funding and to
30replace buses and rehabilitate various

 

1facilities and infrastructure

 

2Project Allocation

47,614,000

3(Base Project Allocation -
4$42,853,000)

 

5(Design & Contingencies - $4,761,000)

 

6(xxiv) State of Good Repair Program, to
7provide for the State of Good Repair
8Program and Facilities Overhaul Program
9and to to rehabilitate or replace various
10facilities and infrastructure

 

11Project Allocation

51,098,000

12(Base Project Allocation -
13$45,988,000)

 

14(Design & Contingencies - $5,110,000)

 

15(xxv) Bus and Bus Facilities Program, to
16match Federal capital funding and replace
17buses and rehabilitate various facilities
18and infrastructure

 

19Project Allocation

3,484,000

20(Base Project Allocation - $3,136,000)

 

21(Design & Contingencies - $348,000)

 

22(xxvi) Bus Purchase Flex Program, to match
23Federal funds to replace buses and
24rehabilitate various facilities and
25infrastructure

 

26Project Allocation

8,267,000

27(Base Project Allocation - $7,440,000)

 

28(Design & Contingencies - $827,000)

 

29(xxvii) Federal Grant Program, to match
30discretionary Federal capital funding to

 

1rehabilitate or replace existing
2facilities and infrastructure

 

3Project Allocation

1,452,000

4(Base Project Allocation - $1,307,000)

 

5(Design & Contingencies - $145,000)

 

6(xxviii) Infrastructure Safety Renewal
7Program, to provide for transit and
8railroad infrastructure, including
9maintenance support facilities

 

10Project Allocation

67,744,000

11(Base Project Allocation -
12$60,970,000)

 

13(Design & Contingencies - $6,774,000)

 

14(xxix) Fiscal year 2014-2015 State of Good
15Repair Program, to provide for the State
16of Good Repair Program and Facilities
17Overhaul Program and to rehabilitate or
18replace various facilities and
19infrastructure

 

20Project Allocation

19,356,000

21(Base Project Allocation -
22$17,420,000)

 

23(Design & Contingencies - $1,936,000)

 

24(xxx) Vehicle Overhaul Program, to provide
25for fiscal year 2013-2014 Vehicle Overhaul
26Program

 

27Project Allocation

53,266,000

28(Base Project Allocation -
29$47,903,000)

 

30(Design & Contingencies - $5,323,000)

 

1(xxxi) Federal Grant Program, provide State
2funds to match discretionary Federal
3capital funding to rehabilitate or replace
4existing assets

 

5Project Allocation

4,839,000

6(Base Project Allocation - $4,355,000)

 

7(Design & Contingencies - $484,000)

 

8(19) Department of Transportation

 

9(i) Vehicle and Capital Equipment Program, to
10provide funding match for non-Federal
11projects for purchase of transit vehicles
12and other capital equipment and
13infrastructure

 

14Project Allocation

50,000,000

15(Base Project Allocation -
16$45,000,000)

 

17(Design & Contingencies - $5,000,000)

 

18(ii) Provide funding for capital improvements
19and capital maintenance to Keystone
20Corridor, including interlockings and
21stations

 

22Project Allocation

15,000,000

23(Base Project Allocation -
24$13,500,000)

 

25(Design & Contingencies - $1,500,000)

 

26(iii) Vehicle and Capital Equipment Program,
27to provide funding match for Federal
28projects for purchase of transit vehicles
29and other capital equipment and
30infrastructure

 

1Project Allocation

50,000,000

2(Base Project Allocation -
3$45,000,000)

 

4(Design & Contingencies - $5,000,000)

 

5(iv) Alternative Fuel Vehicles Program,
6provide for CNG, equipment and
7infrastructure to support alternate fuel
8vehicles for various transit authorities
9across this Commonwealth

 

10Project Allocation

50,000,000

11(Base Project Allocation -
12$50,000,000)

 

13(19.1) Washington City Transit

 

14(i) Improve transit facilities, to provide
15for purchase of passenger amenities

 

16Project Allocation

58,000

17(Base Project Allocation - $52,000)

 

18(Design & Contingencies - $6,000)

 

19(ii) Purchase equipment, to provide for
20purchase of new equipment for additional
21transit staff

 

22Project Allocation

24,000

23(Base Project Allocation - $22,000)

 

24(Design & Contingencies - $2,000)

 

25(20) York County Transportation Authority

 

26(i) Renovate transit operations
27center/maintenance facility

 

28Project Allocation

8,710,000

29(Base Project Allocation - $7,839,000)

 

30(Design & Contingencies - $871,000)

 

1(ii) Purchase buses, to provide for
2replacement of fixed-route vehicles

 

3Project Allocation

1,348,000

4(Base Project Allocation - $1,213,000)

 

5(Design & Contingencies - $135,000)

 

6(b) Rural and intercity rail.--Additional capital projects
7in the category of transportation assistance projects for rural
8and intercity rail service projects to be constructed or with
9respect to which an interest is to be acquired by the Department
10of Transportation, its successors or assigns and to be financed
11by the incurring of debt are hereby itemized, together with
12their respective estimated financial costs, as follows:

13 

14Project

Total Project

Allocation

15(1) Allegheny County

 

16(i) City of Pittsburgh

 

17(A) High-density redevelopment at new and
18existing transit stops along proposed
19Bus Rapid Transit Route and Lightrail
20and Busway stops in City of Pittsburgh

 

21Project Allocation

20,000,000

22(Base Project Allocation -
23$20,000,000)

 

24(ii) Three Rivers Marine & Rail Terminals

 

25(A) Rail rehabilitation, including track

26infrastructure improvements, upgrade
27ballast, ties and surface and align
28tracks for Glassport Terminal rail
29expansion project

 

30Project Allocation

1,500,000

1(Base Project Allocation - $1,500,000)

 

2(2) Allegheny, Fayette, Washington and
3Westmoreland Counties

 

4(i) Wheeling & Lake Erie Railroad

 

5(A) Upgrade existing infrastructure and
6construct new capacity for projected
7increases in car loadings and new
8customer development, including
9engineering, site preparation,
10grading, rail, ties, ballast,
11switches, signals, crossings, bridges,
12tunnels, slope stabilization and other
13related materials

 

14Project Allocation

10,000,000

15(Base Project Allocation -
16$10,000,000)

 

17(3) Allegheny, Butler and Washington Counties

 

18(i) Allegheny Valley Railroad

 

19(A) Rehabilitate and build railroad
20infrastructure to enhance operational
21capacity, including acquisition of
22land, planning and engineering, rail,
23crossties, roadbed, drainage,
24interchanges, lubricators, sidings,
25public delivery tracks, bridges,
26tunnels, crossings, freight yard
27modification and expansion

 

28Project Allocation

8,000,000

29(Base Project Allocation - $8,000,000)

 

30(3.1) Allegheny and Washington Counties

 

1(i) Pittsburgh and Ohio Central Railroad

 

2(A) Rehabilitation, including ties, rail,
3surface, bridge, switches, ditching,
4undercutting, brush cutting, road
5crossings, signal and communication
6and related work

 

7Project Allocation

4,900,000

8(Base Project Allocation - $4,900,000)

 

9(B) Rail construction or rehabilitation,
10including switches, ties, rail,
11surface, bridge, switches, ditching,
12undercutting, brush cutting, road
13crossings, signal and communication
14and related work

 

15Project Allocation

7,000,000

16(Base Project Allocation - $7,000,000)

 

17(4) Beaver County

 

18(i) Aliquippa and Ohio River Railroad

 

19(A) Rehabilitation, including ties, rail,
20surface, bridge, switches, ditching,
21undercutting, brush cutting, road
22crossings, signal and communication
23and related work

 

24Project Allocation

3,500,000

25(Base Project Allocation - $3,500,000)

 

26(B) Rail construction or rail
27rehabilitation for support of new or
28existing customers in Beaver County

 

29Project Allocation

7,000,000

30(Base Project Allocation - $7,000,000)

 

1(5) Berks County

 

2(i) City of Reading

 

3(A) Rehabilitation, construction and
4renovation of rail infrastructure to
5service Evergreen Community Power
6site, including track construction and
7rebuild, property and right-of-way
8acquisition, design, engineering,
9permitting, rails, ties, ballast,
10crossings, switches, turnouts, repair
11of grade crossings, track and other
12repairs and rebuilds, construction of
13rail service and any other related
14costs

 

15Project Allocation

5,000,000

16(Base Project Allocation - $5,000,000)

 

17(ii) Colebrookdale Railroad

 

<-18(A) Rehabilitation of historic Civil War
19Era railroad, including track
20improvements, siding extensions,
21passenger station development,
22equipment maintenance facility
23construction and related work

 

24Project Allocation

10,000,000

25(Base Project Allocation -
26$10,000,000)

 

<-27(A) Rehabilitation of railroad, including
28track improvements, siding extensions,
29visitors center, equipment and
30equipment maintenance facility,

 

1construction and related work to
2enhance economic development
3opportunities and enhance corridor for
4freight traffic in Berks and
5Montgomery Counties

 

6Project Allocation

10,000,000

7(Base Project Allocation -
8$10,000,000)

 

9(iii) Richmond Township

 

10(A) Construction of an approximately
113,000 feet, three-track rail spur from
12Norfolk Southern eastbound mainline
13between Reading and Allentown to East
14Penn Manufacturing facility, including
15track, ties, rail, switches, surface,
16bridges, road crossing, drainage,
17grading and other associated
18improvements and costs

 

19Project Allocation

921,000

20(Base Project Allocation - $921,000)

 

21(6) Bucks County

 

22(i) Fairless Hills

 

23(A) Acquisition, infrastructure,
24redevelopment, construction and other
25related costs for Fairless Hills rail
26expansion project at the Keystone
27Industrial Port complex

 

28Project Allocation

5,750,000

29(Base Project Allocation - $5,750,000)

 

<-30(ii) Falls Township

 

1(A) Acquisition, infrastructure, rail
2improvements and other related costs
3for development of industrial facility
4located at Keystone Industrial Port
5Complex

 

6Project Allocation

15,000,000

7(Base Project Allocation -
8$15,000,000)

 

<-9(ii) Bucks County Industrial Development
10Authority

 

<-11(iii) Bucks County Industrial Development
12Authority

 

13(A) Acquisition, infrastructure,
14redevelopment, construction and other
15related costs to extend rail service
16to Riverside Industrial Park

 

17Project Allocation

5,000,000

18(Base Project Allocation - $5,000,000)

 

<-19(iii) SMS Rail Lines

 

<-20(iv) SMS Rail Lines

 

21(A) Expand service to current and future
22customers and upgrade rail
23infrastructure, including land
24acquisition, engineering, site
25preparation, rail, ties, undercutting,
26ballast, sidings, crossings, equipment
27and other related materials

 

28Project Allocation

4,000,000

29(Base Project Allocation - $4,000,000)

 

30(7) Cambria County

 

1(i) City of Johnstown

 

2(A) Rehabilitation, construction and
3renovation of rail infrastructure to
4service an economic development
5project related to or impacted by
6Marcellus Shale natural gas production
7located in the greater Johnstown area,
8including track construction and
9rebuild, property and right-of-way
10acquisition, design, engineering,
11permitting, rails, ties, ballast,
12crossings, switches, turnouts, repair
13of grade crossings, track and other
14repairs and rebuilds, construction of
15rail station and any other related
16costs

 

17Project Allocation

10,000,000

18(Base Project Allocation -
19$10,000,000)

 

20(ii) County projects

 

21(A) Rehabilitation, construction and
22renovation of rail infrastructure to
23service an economic development
24project related to or impacted by
25Marcellus Shale natural gas
26production, located in the greater
27Johnstown area, including track
28construction and rebuild, property and
29right-of-way acquisition, design,
30engineering, permitting, rails, ties,

 

1ballast, crossings, switches,
2turnouts, repair of grade crossings,
3track and other repairs and rebuilds,
4construction of rail station and any
5other related costs

 

6Project Allocation

10,000,000

7(Base Project Allocation -
8$10,000,000)

 

<-9(B) Rehabilitation, construction and
10renovation of rail infrastructure to
11serve economic development project

 

12Project Allocation

10,000,000

13(Base Project Allocation -
14$10,000,000)

 

15(7.1) Carbon County

 

<-16(i) Graymont, Inc., Pleasant Gap

 

17(A) Rail construction and rehabilitation,
18including grading and filling,
19ballasts, switches, derailers and
20related work for a Graymont, Inc.,
21Pleasant Gap plant rail expansion
22project

 

23Project Allocation

2,100,000

24(Base Project Allocation - $2,100,000)

 

25(i)<- (ii) Reading Blue Mountain and Northern
26Railroad

 

27(A) Nesquehoning bridge project, Phase 2,
28construction of second span over
29Lehigh River adjacent to existing
30bridge

 

1Project Allocation

10,000,000

2(Base Project Allocation -
3$10,000,000)

 

<-4(7.2) Centre County

 

5(i) Titan Energy Park

 

6(A) Rail construction, rail sidings,
7switches, bridge replacement, site
8upgrades, connector road, loading
9equipment, building upgrades, access
10systems and other related costs for
11development of centralized
12transloading site

 

13Project Allocation

5,000,000

14(Base Project Allocation - $5,000,000)

 

15(7.3) Chester County<-

 

16(i) Coatesville City

 

17(A) Rehabilitation of rail infrastructure
18pertaining to Modena Railroad Bridge
19to facilitate efficient and safe
20movement of raw materials and finished
21steel products, including, but not
22limited to, engineering, site
23preparation, drainage, grading, rails,
24ties, ballast, switches, crossings,
25sidings, bridge and paving

 

26Project Allocation

2,800,000

27(Base Project Allocation - $2,800,000)

 

28(7.4) Clearfield County

 

29(i) Bloom Township

 

30(A) Construction, infrastructure and

 

1other related costs for the
2development of a regional trans
3loading facility at the Falls Creek
4location of Russell Stone Products

 

5Project Allocation

1,400,000

6(Base Project Allocation - $1,400,000)

 

7(7.2) <-(7.3) Clinton County

 

8(7.5) Clinton County

<-

9(i) Clinton County Solid Waste Authority

 

10(A) Construction and related
11infrastructure for railroad siding and
12transloading facility in Wayne
13Township

 

14Project Allocation

1,000,000

15(Base Project Allocation - $1,000,000)

 

16(ii) Clinton County Economic Partnership

 

17(A) Construct siding and loading
18facilities for the <-Wayne Township 
19landfill Henry Street Rail project

 

20Project Allocation

1,000,000

21(Base Project Allocation - $1,000,000)

 

22(7.3) <-(7.4) Crawford County

 

<-23(7.6) Crawford County

 

24(i) Economic Progress Alliance of Crawford
25County

 

26(A) Infrastructure, construction and
27other related costs for development of
28Keystone Regional Industrial Park rail
29line, including improvements to
30existing rail line and construction of

 

1new track and turnouts

 

2Project Allocation

5,000,000

3(Base Project Allocation - $5,000,000)

 

4(7.4) <-(7.5) Dauphin County

 

<-5(7.7) Dauphin County

 

6(i) Steelton and Highspire Railroad

 

7(A) Rehabilitation of rail infrastructure
8to facilitate the efficient and safe
9movement of raw materials and finished
10steel products in Dauphin County,
11including engineering, site
12preparation, drainage, grading, rails,
13ties, ballast, switches, crossings,
14sidings, bridge and paving

 

15Project Allocation

8,000,000

16(Base Project Allocation - $8,000,000)

 

<-17(7.6) Delaware County

 

<-18(7.8) Delaware County

 

19(i) Delaware County Redevelopment Authority

 

20(A) Construction, acquisition, railroad
21infrastructure, including support
22facilities, and related costs for
23economic development project in
24Delaware County

 

25Project Allocation

10,000,000

26(Base Project Allocation -
27$10,000,000)

 

28(ii) SEPTA Media/Elwyn Regional Rail

 

29(A) Construction, infrastructure,
30redevelopment and other related costs

 

1for modernization of Secane Regional
2Rail Station

 

3Project Allocation

13,000,000

4(Base Project Allocation -
5$13,000,000)

 

6(8) Erie County

 

7(i) City of Erie

 

8(A) Construct rail improvements and ship
9loading infrastructure at the Port of
10Erie.

 

11Project Allocation

9,000,000

12(Base Project Allocation - $9,000,000)

 

13(B) Construct rail improvements and
14replace rail bridge at Erie Inland
15Port-Albion site.

 

16Project Allocation

12,000,000

17(Base Project Allocation -
18$12,000,000)

 

19(9) Fayette and Westmoreland Counties

 

20(i) Southwest Pennsylvania Railroad Company

 

21(A) Rehabilitate and build railroad
22infrastructure to enhance operational
23capacity, including acquisition of
24land, planning and engineering, rail,
25crossties, roadbed, drainage,
26interchanges, lubricators, sidings,
27public delivery tracks, bridges,
28crossings, freight yard modification
29and expansion

 

30Project Allocation

11,500,000

1(Base Project Allocation -
2$11,500,000)

 

3(10) Lackawanna County

 

4(i) Pocono Northeast Regional Railroad
5Authority

 

6(A) Purchase and install ties, ballast,
7raise, line and surface, bridge
8repairs, tunnel repairs, crossing
9rehabilitation and other related costs
10for Laurel Line Mainline project

 

11Project Allocation

1,500,000

12(Base Project Allocation - $1,500,000)

 

13(ii) Pennsylvania Northeast Regional Railroad
14Authority

 

15(A) Purchase and install ties, ballast,
16raise, line and surface, bridge
17repairs, tunnel repairs, crossing
18rehabilitation and other related costs
19for Carbondale Mainline

 

20Project Allocation

2,000,000

21(Base Project Allocation - $2,000,000)

 

22(B) Purchase and install ties, ballast,
23raise, line and surface, bridge
24repairs, tunnel repairs, crossing
25rehabilitation and other related costs
26for Pocono Mainline

 

27Project Allocation

1,250,000

28(Base Project Allocation - $1,250,000)

 

29(iii) County of Lackawanna Transit System

 

30(A) Acquisition, construction,

 

1infrastructure and other costs related
2to an intermodal transportation center

 

3Project Allocation

1,000,000

4(Base Project Allocation - $1,000,000)

 

5(11) Lancaster County

 

<-6(i) Columbia Economic Development Corporation

 

7(A) Construction, infrastructure,
8redevelopment and other related costs
9for railroad tracks, turnouts to serve
10as a rail yard, a runaround track,
11track repair and rehabilitation in
12Columbia Borough

 

13Project Allocation

733,000

14(Base Project Allocation - $733,000)

 

15(ii) Lancaster County Redevelopment Authority

 

16(A) Acquisition, construction,
17infrastructure and other related costs
18for rail relocation, including removal
19of old tracks, construction of new
20switching track and redevelopment of
21old track site in Lititz Borough

 

22Project Allocation

3,000,000

23(Base Project Allocation - $3,000,000)

 

24(i) <-(iii) Strasburg Railroad

 

25(A) Land acquisition, engineering, rail,
26ties, ballast, crossings, transload
27equipment and other related costs for
28expansion of existing transload
29terminal and rail infrastructure

 

30Project Allocation

4,000,000

1(Base Project Allocation - $4,000,000)

 

<-2(iv) Urban Outfitters, Inc.

 

3(A) Rehabilitation, construction and
4renovation of rail infrastructure to
5service a direct-to-consumer
6distribution center located in the Gap
7area of Lancaster County, including
8track construction and rebuild,
9property and right-of-way acquisition,
10design, engineering, permitting,
11rails, ties, ballasts, crossings,
12switches, turnouts, repair of grade
13crossings, track and other repairs and
14rebuilds, construction of rail station
15and any other related costs in
16Salisbury Township

 

17Project Allocation

10,000,000

18(Base Project Allocation -
19$10,000,000)

 

<-20(11.1) Luzerne County

 

21(i) County projects

 

22(A) Rehabilitate existing rail
23infrastructure and construct transload
24facility, including site preparation,
25engineering, grading, rail, ties,
26ballast, switch relocation, paving,
27gravel, fabrication of concrete pad,
28acquiring and installing truck scale
29and other materials necessary in the
30operation of the new facility

 

1Project Allocation

1,400,000

2(Base Project Allocation - $1,400,000)

 

3(B) Construction, site preparation,
4engineering, grading, rail ties,
5ballast, acquiring and installing rail
6scale and other related materials to
7extend siding to provide direct rail
8access to Northeast Recycling
9Solutions

 

10Project Allocation

2,000,000

11(Base Project Allocation - $2,000,000)

 

12(12) Lycoming County

 

13(i) Jersey Shore Railroad

 

14(A) Rehabilitation of existing yard rail
15infrastructure and construction of
16additional track to increase capacity
17within the yard, including
18engineering, site preparation, rail,
19ties, ballast and grade crossings

 

20Project Allocation

3,500,000

21(Base Project Allocation - $3,500,000)

 

22(ii) Williamsport City

 

23(A) Track rehabilitation, new 
24construction and other related costs 
25to provide rail service to NuWeld 
26Corporation facility

 

27Project Allocation

350,000

28(Base Project Allocation - $350,000)

 

29(13) McKean County

 

30(i) American Refining Group

 

1(A) Reconstruct loading areas and
2rehabilitate existing infrastructure
3in McKean County to facilitate safe
4and efficient transfer of products
5critical to oil refining and petroleum
6distribution supply chain, including
7engineering, site preparation, rail,
8ties, ballast, switches, sidings,
9crossings, drainage, pipe and related
10loading equipment

 

11Project Allocation

4,000,000

12(Base Project Allocation - $4,000,000)

 

13(ii) McKean County Economic Development

 

14(A) Acquisition, construction,
15rehabilitation, restoration,
16remediation, maintenance and
17infrastructure development and
18improvements for railroad development
19project

 

20Project Allocation

10,000,000

21(Base Project Allocation -
22$10,000,000)

 

<-23(13.1) Mercer County

 

24(i) Hempfield Township

 

25(A) Design, infrastructure, construction
26and other related costs for
27installation of new rail spur and rail
28siding at Hodge Foundry

 

29Project Allocation

700,000

30(Base Project Allocation - $700,000)

 

1(14) Mifflin County

 

2(i) Mifflin County Industrial Development
3Authority

 

4(A) Infrastructure, rehabilitation,
5abatement of hazardous materials and
6other related costs for remediation of
7abandoned brownfield site and
8construction of new railroad
9infrastructure

 

10Project Allocation

2,000,000

11(Base Project Allocation - $2,000,000)

 

12(15) Monroe County

 

13(i) Pennsylvania Northeast Regional Railroad
14Authority

 

15(A) Purchase and install ties, ballast,
16raise, line and surface, bridge
17repairs, tunnel repairs, crossing
18rehabilitation and other related costs
19for Pocono Mainline

 

20Project Allocation

2,500,000

21(Base Project Allocation - $2,500,000)

 

22(16) Montgomery County

 

23(i) Montgomery County

 

24(A) Construction, infrastructure
25improvements and other costs related
26to expansion of Ardmore Train Station
27transit and parking improvements
28project

 

29Project Allocation

10,000,000

30(Base Project Allocation -

 

1$10,000,000)

 

<-2(ii) Colebrookdale Railroad

 

3(A) Rehabilitation of railroad, including
4track improvements, siding extensions,
5visitors centers, equipment and
6equipment maintenance facility,
7construction and related work to
8enhance economic development
9opportunities and enhance corridor for
10freight traffic in Berks and
11Montgomery Counties

 

12Project Allocation

10,000,000

13(Base Project Allocation -
14$10,000,000)

 

<-15(iii) Pennsylvania Northeastern Railroad

 

16(A) Rehabilitation of railroad, including
17track improvements, resurfacing road
18crossings and related remedial work to
19enhance economic development
20opportunities and enhance corridor for
21freight traffic in Lansdale, Hatfield
22and Souderton

 

23Project Allocation

770,000

24(Base Project Allocation - $770,000)

 

25(16.1) Philadelphia

 

26(i) Philadelphia Regional Port Authority and
27PennDOT

 

28(A) General access and on-terminal rail
29improvements for port facilities

 

30Project Allocation

18,000,000

1(Base Project Allocation -
2$18,000,000)

 

3(ii) Philadelphia County

 

4(A) Port of Philadelphia Pier 122 bulk
5cargo terminal facility, new rail line
6and rail turnout construction, pier
7crane, materials and equipment

 

8Project Allocation

3,700,000

9(Base Project Allocation - $3,700,000)

 

10(17) Schuylkill County

 

11(i) Greater Tamaqua Industrial Development
12Enterprise

 

13(A) Infrastructure, rehabilitation and
14other related costs for Gordon
15Building rail spur project, including
16new rail and switches

 

17Project Allocation

140,000

18(Base Project Allocation - $140,000)

 

<-19(17.1) Somerset County

 

20(i) Somerset County

 

21(A) Construction, infrastructure and
22other related costs for rail projects
23relating to economic development
24projects in Quemahoning Township

 

25Project Allocation

2,000,000

26(Base Project Allocation - $2,000,000)

 

27(B) Acquisition, construction,
28infrastructure and other related costs
29for rail siding and transloading
30facility in Shade Township

 

1Project Allocation

2,100,000

2(Base Project Allocation - $2,100,000)

 

3(18) Washington County

 

4(i) Washington County

 

5(A) Acquisition, construction,
6infrastructure, redevelopment and
7other costs related to site
8improvement project at Mon River
9Industrial Park in Allenport Borough

 

10Project Allocation

10,000,000

11(Base Project Allocation -
12$10,000,000)

 

13(B) Acquisition, construction,
14infrastructure, redevelopment and
15other costs related to Zediker Station
16Business Park improvement project in
17South Strabane Township

 

18Project Allocation

10,000,000

19(Base Project Allocation -
20$10,000,000)

 

21(C) Acquisition, construction,
22infrastructure, redevelopment and
23other costs related to mixed-use
24business park

 

25Project Allocation

2,000,000

26(Base Project Allocation - $2,000,000)

 

27(D) Acquisition, construction,
28infrastructure, redevelopment and
29other costs related to development of
30pad-ready sites along the I-79 and

 

1Route 19 corridor

 

2Project Allocation

5,000,000

3(Base Project Allocation - $5,000,000)

 

4(E) Acquisition, construction,
5infrastructure, redevelopment and
6other costs related to locating sites
7for support companies for natural gas
8industry

 

9Project Allocation

3,000,000

10(Base Project Allocation - $3,000,000)

 

11(F) Acquisition, construction,
12infrastructure, redevelopment and
13other costs related to redevelopment
14of former industrial sites for new and
15expanding businesses

 

16Project Allocation

5,000,000

17(Base Project Allocation - $5,000,000)

 

18(G) Acquisition, construction,
19infrastructure, redevelopment and
20other costs related to Mon Valley
21receiving and loading facility
22development project

 

23Project Allocation

5,000,000

24(Base Project Allocation - $5,000,000)

 

25(H) Acquisition, construction,
26infrastructure, redevelopment and
27other costs related to development of
28sites adjacent to Washington County
29Airport for aviation-related business
30park

 

1Project Allocation

10,000,000

2(Base Project Allocation -
3$10,000,000)

 

4(I) Acquisition, construction,
5infrastructure, redevelopment and
6other costs related to Skypointe
7business park

 

8Project Allocation

5,000,000

9(Base Project Allocation - $5,000,000)

 

<-10(J) Acquisition, construction,
11infrastructure and other related costs
12for loadout facility in Carroll
13Township

 

14Project Allocation

4,750,000

15(Base Project Allocation - $4,750,000)

 

16(19) Westmoreland County

 

17(i) Three Rivers Marine and Rail Terminal LP

 

18(A) Infrastructure, rehabilitation,
19construction and other related costs
20for rail track expansion, including
21addition of rail switches

 

22Project Allocation

750,000

23(Base Project Allocation - $750,000)

 

24(ii) Westmoreland County Industrial
25Development Corporation

 

26(A) Infrastructure, construction and
27other related costs for Southwest
28Pennsylvania Railroad rail
29rehabilitation project

 

30Project Allocation

1,000,000

1(Base Project Allocation - $1,000,000)

 

2(B) Infrastructure, construction and
3other related costs for Derry
4Porcelain Park Redevelopment project,
5including extension of rail spur
6service for industrial use

 

7Project Allocation

350,000

8(Base Project Allocation - $350,000)

 

<-9(iii) Westmoreland County

 

10(A) Construction, infrastructure and
11other related costs for rail expansion
12project in City of Monessen

 

13Project Allocation

750,000

14(Base Project Allocation - $750,000)

 

15(20) Wyoming County

 

16(i) Procter and Gamble Paper Products Co.,
17Mehoopany Plant

 

18(A) Rehabilitate rail and existing
19infrastructure, including switches,
20signals, ties, ballast, rail, timbers,
21surfacing and other related materials

 

22Project Allocation

250,000

23(Base Project Allocation - $250,000)

 

24(21) Multiple Counties

 

25(i) D & I Silica, LLC

 

26(A) Improve and expand existing transload
27sites in Armstrong, Cameron, Elk,
28Fayette, Luzerne, McKean, Tioga and
29Warren Counties, including land
30acquisition, drainage, ditching, rail,

 

1ties, ballast, switches, grading,
2surfacing, gaging, unloading pits,
3transload equipment, truck staging and
4road access

 

5Project Allocation

5,500,000

6(Base Project Allocation - $5,500,000)

 

7(B) Establish new intermodal facilities
8to transload materials required by
9natural gas industry in Blair,
10Bradford, Butler, Centre, Clearfield,
11Clinton, Crawford, Erie, Indiana,
12Lawrence, Mercer, Venango,
13Westmoreland and Wyoming Counties,
14including land acquisition, site
15preparation, brush cutting, drainage,
16ditching, rail, ties, ballast,
17switches, grading, surfacing,
18unloading pits, transload equipment,
19truck staging and road access

 

20Project Allocation

10,000,000

21(Base Project Allocation -
22$10,000,000)

 

23(ii) SEDA-COG Joint Rail Authority

 

24(A) Railroad bridge upgrades, including
25load capacity increases in Columbia,
26Montour, Northumberland, Union,
27Lycoming, Clinton, Centre, Blair and
28Mifflin Counties

 

29Project Allocation

2,100,000

30(Base Project Allocation - $2,100,000)

 

1(B) Nittany & Bald Eagle Railroad yard
2upgrades and expansion, including
3construction of railroad tracks in
4Blair, Centre and Clinton Counties

 

5Project Allocation

2,800,000

6(Base Project Allocation - $2,800,000)

 

7(C) Shamokin City and yard
8rehabilitation, including roadbed,
9crossing surfaces, turnouts and
10related track work

 

11Project Allocation

3,150,000

12(Base Project Allocation - $3,150,000)

 

13(D) Lycoming Valley Railroad track
14upgrades and expansion, including
15construction of new storage tracks
16between Williamsport, Lycoming County,
17and South Avis, Clinton County

 

18Project Allocation

1,260,000

19(Base Project Allocation - $1,260,000)

 

20(E) Capital upgrades and other safety
21upgrades to eight railroad bridges in
22Blair, Centre, Columbia, Lycoming,
23Mifflin and Northumberland Counties
24for critical rail service on the
25Nittany & Bald Eagle, Juniata Valley,
26Lycoming Valley, North Shore and
27Shamokin Valley Railroads

 

28Project Allocation

3,500,000

29(Base Project Allocation - $3,500,000)

 

30(iii) North Shore Railroad

 

1(A) Retrofitting of diesel locomotives
2and other equipment to operate on
3alternative fuel sources or natural
4gas, or both, in Lycoming and
5Northumberland Counties

 

6Project Allocation

750,000

7(Base Project Allocation - $750,000)

 

8(B) Rehabilitation, infrastructure,
9construction and other related costs
10for equipment upgrades, installation
11of new technology and other upgrades
12to ensure Federal regulation
13compliance in Blair, Centre, Clinton,
14Columbia, Lycoming, Mifflin, Montour
15and Northumberland Counties

 

16Project Allocation

1,250,000

17(Base Project Allocation - $1,250,000)

 

18(iv) R. J. Corman Railroad Company

 

19(A) Rehabilitation of the rail line known
20as the Clearfield Cluster, located in
21Cambria, Centre, Clearfield, Clinton,
22Indiana and Jefferson Counties,
23including rail bed, ties, rail and
24other materials to support continued
25growth of business in these areas and
26reduction of truck traffic

 

27Project Allocation

20,000,000

28(Base Project Allocation -
29$20,000,000)

 

30(v) Southwest Pennsylvania Railroad

 

1(A) Rehabilitate and build railroad
2infrastructure to enhance operational
3capacity in Fayette and Westmoreland
4Counties, including acquisition of
5land, planning and engineering, rail,
6crossties, roadbed, drainage,
7interchanges, lubricators, sidings,
8public delivery tracks, bridges,
9crossings, freight yard modification
10and expansion

 

11Project Allocation

11,500,000

12(Base Project Allocation -
13$11,500,000)

 

<-14(vi) Colebrookdale Railroad

 

15(A) Rehabilitation of historic Civil War
16Era Railroad, including track
17improvements, siding extensions,
18passenger station development,
19equipment maintenance facility
20construction and related work, to
21develop heritage tourism economic
22opportunities and preserve corridor
23for future freight traffic in Berks
24and Montgomery Counties

 

25Project Allocation

4,000,000

26(Base Project Allocation - $4,000,000)

 

27(vii) <-(vi) Lycoming and Union Counties

 

28(A) Construction, rehabilitation,
29development of rail infrastructure and
30other costs relating to extending

 

1service through Gregg Township, Union
2County, to Timber Run Industrial Park
3in Brady Township, Lycoming County

 

4Project Allocation

7,000,000

5(Base Project Allocation - $7,000,000)

 

6(c) Air transportation.--Additional capital projects in the
7category of transportation assistance projects for air
8transportation service to which an interest is to be acquired by
9the Department of Transportation, its successors or assigns and
10to be financed by the incurring of debt are hereby itemized,
11together with their respective estimated financial costs, as
12follows:

13 

14Project

Total Project

Allocation

15(1) Allegheny County

 

16(i) Allegheny County Airport Authority

 

17(A) Acquisition, construction,
18infrastructure and other related costs
19for aviation, industrial and
20commercial site development and
21improvements at or surrounding
22Allegheny County Airport

 

23Project Allocation

20,000,000

24(Base Project Allocation -
25$20,000,000)

 

26(B) Construction, infrastructure
27improvements and other costs related
28to development of de-icing fluid
29treatment facility at Pittsburgh
30International Airport

 

1Project Allocation

12,500,000

2(Base Project Allocation -
3$12,500,000)

 

4(C) Construction, infrastructure
5improvements and other costs related
6to development of Phase III of Clinton
7Commerce Center

 

8Project Allocation

15,000,000

9(Base Project Allocation -
10$15,000,000)

 

11(D) Construction, infrastructure
12improvements and other costs related
13to development of business park on
14site 7 at Pittsburgh International
15Airport

 

16Project Allocation

7,000,000

17(Base Project Allocation - $7,000,000)

 

18(E) Construction, infrastructure
19improvements and other costs related
20to development of Cherrington Commerce
21Center Phase II

 

22Project Allocation

10,000,000

23(Base Project Allocation -
24$10,000,000)

 

25(F) Acquisition, construction,
26infrastructure and other related costs
27for development of industrial and
28commercial sites at or surrounding
29Pittsburgh International Airport

 

30Project Allocation

50,000,000

1(Base Project Allocation -
2$50,000,000)

 

3(2) Armstrong County

 

4(i) McVille Airport

 

5(A) Acquisition, infrastructure,
6construction and other related costs
7for expansion of existing facilities
8and construction of access road, new
9hangars and helipad

 

10Project Allocation

1,500,000

11(Base Project Allocation - $1,500,000)

 

<-12(2.1) Beaver County

 

13(i) Beaver County Airport Authority

 

14(A) Construction and other related costs
15for hangars and an extension of runway
16in Chippewa Township

 

17Project Allocation

300,000

18(Base Project Allocation - $300,000)

 

19(2.2) Bedford County

 

20(i) Bedford County Airport Authority

 

<-21(A) Construction and other related costs
22for a hangar and required taxi lane

 

23Project Allocation

1,000,000

24(Base Project Allocation - $1,000,000)

 

<-25(A) Acquisition, construction and other
26related costs for airport expansion of
27hangars, required taxi lane, removal
28of landing approach obstructions,
29operation and maintenance buildings,
30required infrastructure, including

 

1roads and parking, for both aircraft
2and automobiles

 

3Project Allocation

10,000,000

4(Base Project Allocation -
5$10,000,000)

 

6(2.3) Bradford County

 

7(i) Bradford County Airport Authority

 

8(A) Construction and other related costs
9to extend runway and parallel taxiway
10in Towanda

 

11Project Allocation

4,227,000

12(Base Project Allocation - $4,227,000)

 

13(3) Bucks County

 

14(i) Bucks County Airport Authority

 

15(A) Infrastructure, construction and
16other related costs for airport
17improvements and upgrades at
18Quakertown Airport, including
19renovations to existing facilities and
20paving of parking lot and access roads

 

21Project Allocation

150,000

22(Base Project Allocation - $150,000)

 

23(B) Infrastructure, construction and
24other related costs for airport
25improvements and upgrades at
26Doylestown Airport, including
27demolition, infrastructure development
28and construction of administration
29building, aircraft storage hangar and
30aircraft maintenance hangar

 

1Project Allocation

1,500,000

2(Base Project Allocation - $1,500,000)

 

3(4) Carbon County

 

4(i) Carbon County Airport Authority

 

5(A) Construction of airport buildings,
6including general aviation terminal
7and snow removal equipment storage and
8aircraft storage hangars

 

9Project Allocation

4,500,000

10(Base Project Allocation - $4,500,000)

 

11(5) Chester County

 

12(i) Chester County Area Airport Authority

 

13(A) Infrastructure, construction and
14other related costs for Phase I of a
15hangar development expansion project

 

16Project Allocation

337,000

17(Base Project Allocation - $337,000)

 

18(6) Crawford County

 

19(i) Crawford County Regional Airport
20Authority

 

21(A) Design, engineer and other related
22costs for the construction of field
23hangar

 

24Project Allocation

1,500,000

25(Base Project Allocation - $1,500,000)

 

26(B) Design, engineer, and other related
27costs for construction of aircraft T
28hangars

 

29Project Allocation

1,000,000

30(Base Project Allocation - $1,000,000)

 

1(ii) Titusville Airport Authority

 

2(A) Runway expansion

 

3Project Allocation

1,000,000

4(Base Project Allocation - $1,000,000)

 

5(7) Lancaster County

 

6(i) Lancaster Airport Authority

 

7(A) Site development to include sewer
8pumping station and extended sewer
9lines

 

10Project Allocation

750,000

11(Base Project Allocation - $750,000)

 

<-12(8) Luzerne County

 

13(i) Hazleton Airport

 

14(A) Acquisition, construction,
15rehabilitation and other related costs
16for hangars and expansion of runway at
17Hazleton Airport

 

18Project Allocation

300,000

19(Base Project Allocation - $300,000)

 

<-20(8) (9) Lycoming County

 

21(i) Williamsport Regional Airport

 

22(A) Design and construction of facility
23improvements, including directional
24signage, terminal building,
25renovations and parking

 

26Project Allocation

3,676,000

27(Base Project Allocation - $3,676,000)

 

28(B) Demolition of existing terminal
29building and other associated
30buildings, construction of new

 

1terminal building and other airport
2improvements

 

3Project Allocation

11,500,000

4(Base Project Allocation -
5$11,500,000)

 

<-6(9) (10) Somerset County

 

7(i) Somerset County Airport

 

8(A) Replacement of existing underground
9aviation fuel storage tanks and
10dispensing units

 

11Project Allocation

400,000

12(Base Project Allocation - $400,000)

 

13(B) Construction of permanent location
14for medical helicopter base

 

15Project Allocation

400,000

16(Base Project Allocation - $400,000)

 

17(C) Construction of new hangars,
18improvements to existing hangars and
19acquisition of existing hangars

 

20Project Allocation

500,000

21(Base Project Allocation - $500,000)

 

<-22(10) (11) Snyder County

 

23(i) Penn Valley Airport Authority

 

24(A) Acquisition, infrastructure and other
25related costs for development of
26aviation industrial park

 

27Project Allocation

750,000

28(Base Project Allocation - $750,000)

 

29(B) Infrastructure, construction and
30other related costs for construction

 

1of energy-efficient maintenance
2facility

 

3Project Allocation

850,000

4(Base Project Allocation - $850,000)

 

<-5(11) (12) Washington County

 

6(i) Washington County Airport

 

7(A) Acquisition, construction,
8infrastructure, redevelopment and
9other costs related to development of
10sites adjacent to Washington County
11Airport for aviation-related business
12park

 

13Project Allocation

10,000,000

14(Base Project Allocation -
15$10,000,000)

 

16(ii) Skypointe Business Park

 

17(A) Acquisition, construction,
18infrastructure, redevelopment and
19other costs related to Skypointe
20business park

 

21Project Allocation

5,000,000

22(Base Project Allocation - $5,000,000)

 

23Section 6. Itemization of redevelopment assistance projects.

24(a) Additional capital projects in the category of
25redevelopment assistance projects for capital grants by the
26Department of Community and Economic Development, its successors
27or assigns, authorized under the provisions of the act of May
2820, 1949 (P.L.1633, No.493), known as the Housing and
29Redevelopment Assistance Law, and redevelopment assistance
30capital projects and to be financed by the incurring of debt,

1are hereby itemized, together with their estimated financial
2costs, as follows:

3 

4Project

Total Project

Allocation

5(1) Adams County

 

6(i) County projects

 

7(A) Design, infrastructure, construction
8and other related costs for the
9development of county-wide broadband
10infrastructure

 

11Project Allocation

5,000,000

12(Base Project Allocation - $5,000,000)

 

13(ii) Adams County Industrial Development
14Authority

 

15(A) Costs related to site preparations
16for lots within business park,
17including the blasting of diabase

 

18Project Allocation

500,000

19(Base Project Allocation - $500,000)

 

20(iii) Adams County Economic Development
21Corporation

 

22(A) Acquisition, construction and other
23related costs for new Head Start
24facility to provide educational and
25dental services to the community

 

26Project Allocation

1,000,000

27(Base Project Allocation - $1,000,000)

 

28(B) Rehabilitation, construction and
29other related costs for facilities
30expansion within professional center

 

1located in Cumberland Township

 

2Project Allocation

1,000,000

3(Base Project Allocation - $1,000,000)

 

4(C) Construction, infrastructure,
5acquisition and related development
6costs for commercial economic
7development project

 

8Project Allocation

5,000,000

9(Base Project Allocation - $5,000,000)

 

10(2) Allegheny County

 

11(i) County projects

 

12(A) Design, acquisition, infrastructure,
13construction and other related costs
14for redevelopment of Kelman Bottles
15plant, including equipment and system
16upgrades

 

17Project Allocation

2,500,000

18(Base Project Allocation - $2,500,000)

 

19(B) Acquisition, construction,
20infrastructure and other related costs
21for development of industrial and
22commercial sites at or surrounding
23Pittsburgh International Airport

 

24Project Allocation

50,000,000

25(Base Project Allocation -
26$50,000,000)

 

27(C) Infrastructure, site development and
28construction of The Odeon Building
29mixed use facility

 

30Project Allocation

2,000,000

1(Base Project Allocation - $2,000,000)

 

2(D) Acquisition, construction,
3infrastructure improvements and
4related costs for the development of
5an educational complex for Junior
6Achievement of Western Pennsylvania

 

7Project Allocation

5,500,000

8(Base Project Allocation - $5,500,000)

 

9(E) Site development, infrastructure,
10remediation and construction for
11Keystone Commons expansion project

 

12Project Allocation

10,000,000

13(Base Project Allocation -
14$10,000,000)

 

15(ii) City of Clairton

 

16(A) Acquisition, construction,
17infrastructure and other related costs
18for Clairton revitalization project

 

19Project Allocation

1,500,000

20(Base Project Allocation - $1,500,000)

 

<-21(B) Acquisition, construction,
22infrastructure, redevelopment,
23abatement of hazardous materials and
24other related costs for a citywide
25redevelopment project in City of
26Clairton

 

<-27Project Allocation

7,500,000

28(Base Project Allocation - $7,500,000)

 

<-29Project Allocation

750,000

30(Base Project Allocation - $750,000)

 

1(ii.1) City of McKeesport

 

2(A) Acquisition, construction,
3infrastructure, redevelopment,
4abatement of hazardous materials and
5other related costs for citywide
6redevelopment project in City of
7McKeesport

 

8Project Allocation

500,000

9(Base Project Allocation - $500,000)

 

10(iii) City of Pittsburgh

 

11(A) Construction, infrastructure
12improvements and other costs related
13to expansion of Women's Center and
14Shelter of Greater Pittsburgh

 

15Project Allocation

1,500,000

16(Base Project Allocation - $1,500,000)

 

17(B) Construction, infrastructure
18improvements and other costs related
19to mixed-use development of Eastside
20Campus of Chatham University

 

21Project Allocation

20,000,000

22(Base Project Allocation -
23$20,000,000)

 

24(C) Construction, infrastructure
25improvements and other costs related
26to office expansion building for The
27Andy Warhol Museum and Carnegie
28Museums of Pittsburgh

 

29Project Allocation

3,450,000

30(Base Project Allocation - $3,450,000)

 

1(D) Construction, infrastructure
2improvements and other costs related
3to Carnegie Science Center expansion
4project

 

5Project Allocation

15,000,000

6(Base Project Allocation -
7$15,000,000)

 

8(E) Acquisition, construction,
9infrastructure and other related costs
10for public park expansion project

 

11Project Allocation

5,000,000

12(Base Project Allocation - $5,000,000)

 

13(F) Acquisition, construction,
14infrastructure and other related costs
15for Pittsburgh Riverfront
16redevelopment projects

 

17Project Allocation

14,000,000

18(Base Project Allocation -
19$14,000,000)

 

20(G) Acquisition, construction,
21infrastructure and other related costs
22for Pittsburgh Advanced Technology
23Incubator development projects

 

24Project Allocation

10,000,000

25(Base Project Allocation -
26$10,000,000)

 

27(H) Acquisition, construction,
28infrastructure and other related costs
29for North Point Breeze redevelopment

 

30Project Allocation

1,000,000

1(Base Project Allocation - $1,000,000)

 

2(I) Acquisition, construction,
3infrastructure and other related costs
4for Larimer redevelopment neighborhood
5improvement project

 

6Project Allocation

5,000,000

7(Base Project Allocation - $5,000,000)

 

8(J) Acquisition, construction,
9infrastructure and other related costs
10for Homewood redevelopment mixed-use
11rehabilitation project

 

12Project Allocation

2,000,000

13(Base Project Allocation - $2,000,000)

 

14(K) Construction, infrastructure
15improvements and other related costs
16for Garfield redevelopment project

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(L) Acquisition, construction,
20infrastructure and other related costs
21for Entrepreneur Resource Center
22project

 

23Project Allocation

6,000,000

24(Base Project Allocation - $6,000,000)

 

25(M) Acquisition, construction,
26infrastructure and other related costs
27for East Liberty redevelopment project

 

28Project Allocation

15,000,000

29(Base Project Allocation -
30$15,000,000)

 

1(N) Acquisition, construction,
2infrastructure and other related costs
3for Construction Junction project

 

4Project Allocation

4,000,000

5(Base Project Allocation - $4,000,000)

 

6(O) Acquisition, construction,
7infrastructure and other related costs
8for redevelopment of closed schools
9and historic churches into housing,
10office or commercial uses

 

11Project Allocation

2,000,000

12(Base Project Allocation - $2,000,000)

 

13(P) Demolition, acquisition,
14construction, infrastructure and other
15related costs for redevelopment of
16areas in Central Lawrenceville

 

17Project Allocation

5,500,000

18(Base Project Allocation - $5,500,000)

 

19(Q) Acquisition, construction,
20infrastructure and other related costs
21for Allegheny Riverfront redevelopment
22project

 

23Project Allocation

14,000,000

24(Base Project Allocation -
25$14,000,000)

 

26(R) Acquisition, construction,
27infrastructure and other related costs
28for Hill District Uptown redevelopment
29project

 

30Project Allocation

2,000,000

1(Base Project Allocation - $2,000,000)

 

2(S) Acquisition, construction,
3infrastructure and other related costs
4for Pittsburgh Neighborhood
5Connectivity project

 

6Project Allocation

200,000,000

7(Base Project Allocation -
8$200,000,000)

 

9(T) Acquisition, construction,
10infrastructure and other related costs
11for transit-oriented development
12projects

 

13Project Allocation

20,000,000

14(Base Project Allocation -
15$20,000,000)

 

16(U) Acquisition, construction,
17infrastructure and other related costs
18for Flashlight Factory Loft project

 

19Project Allocation

1,500,000

20(Base Project Allocation - $1,500,000)

 

21(V) Acquisition, construction,
22infrastructure and other related costs
23for Duquesne University renovation
24project

 

<-25Project Allocation

10,000,000

26(Base Project Allocation -
27$10,000,000)

 

<-28Project Allocation

20,000,000

29(Base Project Allocation -
30$20,000,000)

 

1(W) Acquisition, construction,
2infrastructure and other related costs
3for University of Pittsburgh Medical
4Center Mercy projects

 

5Project Allocation

6,000,000

6(Base Project Allocation - $6,000,000)

 

7(X) Acquisition, construction,
8infrastructure and other related costs
9for University of Pittsburgh Medical
10Center Magee-Women's Hospital service
11line expansion project

 

12Project Allocation

6,000,000

13(Base Project Allocation - $6,000,000)

 

14(Y) Construction, infrastructure and
15other related costs for Pittsburgh
16Symphony Orchestra Heinz Hall
17renovation project

 

18Project Allocation

10,000,000

19(Base Project Allocation -
20$10,000,000)

 

21(Z) Construction, infrastructure and
22other related costs for Gardens at
23Market Square mixed-use development
24project

 

25Project Allocation

8,000,000

26(Base Project Allocation - $8,000,000)

 

27(AA) Acquisition, construction,
28infrastructure and other related costs
29for redevelopment of West
30Neighborhoods and Sheraden Market

 

1Project Allocation

7,000,000

2(Base Project Allocation - $7,000,000)

 

3(BB) Acquisition, construction,
4infrastructure and other related costs
5for Pittsburgh Civic Building Office
6relocation reinvestment project

 

7Project Allocation

10,000,000

8(Base Project Allocation -
9$10,000,000)

 

10(CC) Construction, infrastructure and
11other related costs for Pittsburgh
12Central Business District parking
13project

 

14Project Allocation

20,000,000

15(Base Project Allocation -
16$20,000,000)

 

17(DD) Acquisition, construction,
18infrastructure and other related costs
19for Parkway Center Mall redevelopment
20project

 

21Project Allocation

10,000,000

22(Base Project Allocation -
23$10,000,000)

 

24(EE) Demolition, acquisition,
25construction, infrastructure and
26related costs for the redevelopment of
27mixed-use development site in the
28neighborhood of Mount Washington

 

29Project Allocation

10,000,000

30(Base Project Allocation -

 

1$10,000,000)

 

2(FF) Construction, infrastructure and
3other related costs for Federal and
4North phase 2 project

 

5Project Allocation

2,000,000

6(Base Project Allocation - $2,000,000)

 

7(GG) Construction, infrastructure and
8other related costs for Downtown
9Pittsburgh revitalization project

 

10Project Allocation

20,000,000

11(Base Project Allocation -
12$20,000,000)

 

13(HH) Construction, infrastructure and
14other related costs for Downtown
15Preservation project phase 2

 

16Project Allocation

4,000,000

17(Base Project Allocation - $4,000,000)

 

18(II) Acquisition, construction,
19infrastructure and other related costs
20for redevelopment of former J. Allen
21Steel site in the Chateau neighborhood
22and in the adjacent Manchester
23neighborhood

 

24Project Allocation

18,000,000

25(Base Project Allocation -
26$18,000,000)

 

27(JJ) Construction, infrastructure and
28other related costs for Broadhead
29Industrial Park redevelopment project

 

30Project Allocation

10,000,000

1(Base Project Allocation -
2$10,000,000)

 

3(KK) Demolition, construction,
4restoration and related costs for
5commercial corridor in Beechview
6neighborhood

 

7Project Allocation

5,000,000

8(Base Project Allocation - $5,000,000)

 

9(LL) Construction, infrastructure and
10other related costs for Robert Morris
11University Student Recreation Center
12redevelopment project

 

13Project Allocation

5,000,000

14(Base Project Allocation - $5,000,000)

 

15(MM) Renovations, infrastructure,
16rehabilitation and other related costs
17for Robert Morris University Yorktown
18Hall

 

19Project Allocation

1,000,000

20(Base Project Allocation - $1,000,000)

 

21(NN) Acquisition, remediation,
22infrastructure development and related
23site preparation costs for
24redevelopment of former brownfield
25site in Squirrel Hill and Swisshelm
26Park neighborhoods

 

27Project Allocation

5,000,000

28(Base Project Allocation - $5,000,000)

 

29(OO) Acquisition, site preparation of
30parking garages and related

 

1infrastructure within the
2redevelopment sites of South Side
3Works and Pittsburgh Technology Center

 

4Project Allocation

15,000,000

5(Base Project Allocation -
6$15,000,000)

 

7(PP) Acquisition, remediation,
8construction, infrastructure and
9related site preparation costs in
10Hazelwood neighborhood

 

11Project Allocation

20,000,000

12(Base Project Allocation -
13$20,000,000)

 

14(QQ) Acquisition, construction,
15renovation, infrastructure and related
16activities in redevelopment of
17neighborhood of Carrick

 

18Project Allocation

5,500,000

19(Base Project Allocation - $5,500,000)

 

20(RR) Acquisition, remediation,
21construction, infrastructure and
22related activities for redevelopment
23of strategic brownfield sites

 

24Project Allocation

15,000,000

25(Base Project Allocation -
26$15,000,000)

 

27(SS) Construction, infrastructure and
28other related costs for Gateway Center
29Islands refurbishment redevelopment
30project

 

1Project Allocation

1,000,000

2(Base Project Allocation - $1,000,000)

 

3(TT) Acquisition, infrastructure
4improvements, construction and other
5related costs for the University of
6Pittsburgh Medical Center's
7development of a Center for Innovation
8Science's Center for Personalized
9Medicine

 

10Project Allocation

10,000,000

11(Base Project Allocation -
12$10,000,000)

 

13(UU) Construction, renovations,
14infrastructure improvements and other
15related costs for the Northside
16Leadership Conference, Inc., Penn
17Brewery Expansion project

 

18Project Allocation

1,000,000

19(Base Project Allocation - $1,000,000)

 

20(VV) Construction, renovations,
21infrastructure improvements and other
22related costs for the Northside
23Leadership Conference, Inc., East
24Deutschtown Historic Gateway mixed use
25project

 

26Project Allocation

2,000,000

27(Base Project Allocation - $2,000,000)

 

28(WW) Acquisition, construction,
29renovation, site work and
30infrastructure improvements for an

 

1office building and new hotel within
2the Oliver Building

 

3Project Allocation

20,000,000

4(Base Project Allocation -
5$20,000,000)

 

6(XX) Acquisition, construction and
7rehabilitation costs associated with
8converting the Wholey Building into
9residential units

 

10Project Allocation

17,000,000

11(Base Project Allocation -
12$17,000,000)

 

13(YY) Construction, infrastructure site
14development, remediation and other
15costs related to the Lawrenceville
16Technology Center project

 

17Project Allocation

5,000,000

18(Base Project Allocation - $5,000,000)

 

<-19(ZZ) Purchase, renovation and other
20related costs for community homes by
21Keystone Human Services to support
22persons with intellectual disabilities
23at University of Pittsburgh

 

24Project Allocation

50,000,000

25(Base Project Allocation -
26$50,000,000)

 

<-27(ZZ) Construction and other related costs
28for Innovation and Entrepreneurship
29Center

 

30Project Allocation

50,000,000

1(Base Project Allocation -
2$50,000,000)

 

3(AAA) Acquisition, construction,
4redevelopment and other related costs
5for Odeon Building

 

6Project Allocation

3,000,000

7(Base Project Allocation - $3,000,000)

 

8(BBB) Acquisition, construction,
9infrastructure, redevelopment,
10abatement of hazardous materials and
11other related costs for animal
12resource center

 

13Project Allocation

6,500,000

14(Base Project Allocation - $6,500,000)

 

15(CCC) Construction, infrastructure,
16redevelopment and other related costs
17for 31st Street Studios project

 

18Project Allocation

2,500,000

19(Base Project Allocation - $2,500,000)

 

20(DDD) Construction, redevelopment,
21abatement of hazardous materials and
22other related costs for advanced
23digital media design, fabrication and
24simulation center at Carnegie Mellon
25University

 

26Project Allocation

2,000,000

27(Base Project Allocation - $2,000,000)

 

28(EEE) Acquisition, construction,
29infrastructure, redevelopment and
30other related costs for animal

 

1resource center project

 

2Project Allocation

6,500,000

3(Base Project Allocation - $6,500,000)

 

4(FFF) Construction, redevelopment and
5other related costs for projects at
6site of former Carnegie Library
7Allegheny

 

8Project Allocation

1,625,000

9(Base Project Allocation - $1,625,000)

 

10(GGG) Construction, infrastructure,
11redevelopment and other related costs
12for projects at Frick Art and
13Historical Center

 

14Project Allocation

7,500,000

15(Base Project Allocation - $7,500,000)

 

16(HHH) Construction, infrastructure,
17redevelopment, rehabilitation and
18other related costs for Frick Art and
19Historical Center projects

 

20Project Allocation

7,500,000

21(Base Project Allocation - $7,500,000)

 

22(III) Acquisition, construction and other
23related costs for workforce
24development centers in City of
25Pittsburgh

 

26Project Allocation

4,000,000

27(Base Project Allocation - $4,000,000)

 

28(JJJ) Acquisition, construction,
29infrastructure and other related costs
30for National Museum of Broadcasting

 

1Project Allocation

1,500,000

2(Base Project Allocation - $1,500,000)

 

3(KKK) Acquisition, construction,
4infrastructure, redevelopment and
5other related costs for Parkway Center
6Mall

 

7Project Allocation

50,000,000

8(Base Project Allocation -
9$50,000,000)

 

10(LLL) Construction, redevelopment and
11other related costs for Pittsburgh
12Ballet Theatre expansion project

 

13Project Allocation

1,750,000

14(Base Project Allocation - $1,750,000)

 

15(MMM) Acquisition, construction,
16redevelopment and other related costs
17for project at Senator John Heinz
18History Center

 

19Project Allocation

2,000,000

20(Base Project Allocation - $2,000,000)

 

21(NNN) Acquisition, construction,
22infrastructure, redevelopment and
23other related costs for mixed-use
24development project

 

25Project Allocation

8,000,000

26(Base Project Allocation - $8,000,000)

 

27(OOO) Acquisition, construction,
28redevelopment, abatement of hazardous
29materials and other related costs for
30development project near intersection

 

1of Murray Avenue and Forward Avenue

 

2Project Allocation

4,500,000

3(Base Project Allocation - $4,500,000)

 

4(PPP) Acquisition, construction,
5infrastructure, redevelopment and
6other related costs for multimodal
7public transportation facility

 

8Project Allocation

5,000,000

9(Base Project Allocation - $5,000,000)

 

<-10(QQQ) Acquisition, construction,
11infrastructure, redevelopment and
12other related costs for development of
13Schenley Technology Park

 

14Project Allocation

20,000,000

15(Base Project Allocation -
16$20,000,000)

 

17(RRR) Acquisition, construction,
18infrastructure, redevelopment and
19other related costs for expansion and
20redevelopment of commercial and office
21space, including, but not limited to,
22PPG Place

 

23Project Allocation

20,000,000

24(Base Project Allocation -
25$20,000,000)

 

26(SSS) Acquisition, construction,
27infrastructure, redevelopment,
28abatement of hazardous materials and
29other related costs for projects
30relating to Town Place, including

 

1expansion of parking structure

 

2Project Allocation

10,000,000

3(Base Project Allocation -
4$10,000,000)

 

5(TTT) Acquisition, clearing, demolition,
6renovation, expansion, environmental
7remediation, construction,
8infrastructure, streets, utilities and
9other costs associated with the
10Addison development project located
11near Centre Avenue, Kirkpatrick
12Street, Bentley Drive and Devilliers
13Street

 

14Project Allocation

5,000,000

15(Base Project Allocation - $5,000,000)

 

16(UUU) Acquisition, clearing, demolition,
17renovation, expansion, environmental
18remediation, construction,
19infrastructure, streets, utilities,
20storm water mitigation and other costs
21associated with Larimer development
22project located near Negley Run,
23Washington and East Liberty
24Boulevards, Larimer and Lincoln
25Avenues and Broad Street

 

26Project Allocation

5,000,000

27(Base Project Allocation - $5,000,000)

 

28(VVV) Acquisition, construction,
29infrastructure, redevelopment,
30abatement of hazardous waste and other

 

1related costs for Forbes Hotel project

 

2Project Allocation

10,000,000

3(Base Project Allocation -
4$10,000,000)

 

<-5(WWW) Construction, infrastructure,
6redevelopment and other related costs
7for renovation of City Theatre

 

8Project Allocation

3,000,000

9(Base Project Allocation - $3,000,000)

 

10(iii.1) Redevelopment Authority of Allegheny
11County

 

12(A) Acquisition, construction,
13infrastructure, redevelopment and
14other related costs for Chevron
15Appalachian Michigan Business Unit to
16locate its regional headquarters in
17Moon Township

 

18Project Allocation

8,533,000

19(Base Project Allocation - $8,533,000)

 

20(B) Construction, infrastructure,
21redevelopment and other related costs
22for Innovation Ridge technology and
23office park in Marshall Township

 

24Project Allocation

10,000,000

25(Base Project Allocation -
26$10,000,000)

 

27(iii.2) Allegheny County Housing Authority

 

28(A) Acquisition, infrastructure,
29construction and other related costs
30for development of Orchard Park -

 

1Phase I

 

2Project Allocation

750,000

3(Base Project Allocation - $750,000)

 

4(iv) Urban Redevelopment Authority of
5Pittsburgh

 

6(A) Acquisition, redevelopment and
7construction of property to support
8mixed-use development, parking garage
9and other infrastructure in Strip
10District

 

11Project Allocation

10,000,000

12(Base Project Allocation -
13$10,000,000)

 

<-14(iv.1) Aspinwall Borough

 

15(A) Construction, infrastructure,
16redevelopment and other related costs
17for Aspinwall Riverfront Park project

 

18Project Allocation

1,543,000

19(Base Project Allocation - $1,543,000)

 

20(iv.2) Bethel Park Municipality

 

21(A) Construction, infrastructure,
22redevelopment, renovation and other
23related costs for upgrades to Village
24Green Park

 

25Project Allocation

500,000

26(Base Project Allocation - $500,000)

 

27(B) Construction, acquisition, abatement
28of hazardous materials, redevelopment,
29renovation and other related costs for
30upgrades to Bethel Park VFD stations

 

1Project Allocation

500,000

2(Base Project Allocation - $500,000)

 

3(iv.3) Brentwood Borough

 

4(A) Construction, redevelopment and other
5related costs for Brentwood Municipal
6Public Safety Center

 

7Project Allocation

3,000,000

8(Base Project Allocation - $3,000,000)

 

9(B) Construction, redevelopment and other
10related costs for Brentwood Municipal
11Stadium

 

12Project Allocation

1,000,000

13(Base Project Allocation - $1,000,000)

 

14(v) Bridgeville Borough

 

15(A) Construction, infrastructure and
16other related costs for ACHIEVA's
17manufacturing facility expansion
18project

 

19Project Allocation

2,000,000

20(Base Project Allocation - $2,000,000)

 

<-21(v.1) Castle Shannon Borough

 

22(A) Construction, acquisition,
23infrastructure<-, redevelopment and
24other related costs for Waverly
25Terrace housing project

 

26Project Allocation

12,000,000

27(Base Project Allocation -
28$12,000,000)

 

29(v.2) Crafton Borough

 

30(A) Construction, infrastructure,

 

1redevelopment and other related costs
2for Crafton Park rehabilitation
3project

 

4Project Allocation

1,205,000

5(Base Project Allocation - $1,205,000)

 

6(v.1) <-(v.3) Edgewood Borough

 

7(A) Construction, infrastructure
8improvements and related costs for a
9new residence hall at the Western
10Pennsylvania School for the Deaf

 

11Project Allocation

3,000,000

12(Base Project Allocation - $3,000,000)

 

<-13(v.4) Etna Borough

 

14(A) Construction and other related costs
15for municipal complex improvements

 

16Project Allocation

1,000,000

17(Base Project Allocation - $1,000,000)

 

18(vi) Findlay Township

 

19(A) Construction, infrastructure
20improvements and other costs related
21to development of de-icing fluid
22treatment facility at Pittsburgh
23International Airport

 

24Project Allocation

12,500,000

25(Base Project Allocation -
26$12,500,000)

 

27(B) Construction, infrastructure
28improvements and other costs related
29to development of Phase III of Clinton
30Commerce Center

 

1Project Allocation

15,000,000

2(Base Project Allocation -
3$15,000,000)

 

<-4(C) Construction, acquisition,
5infrastructure and other related costs
6for development project

 

7Project Allocation

20,000,000

8(Base Project Allocation -
9$20,000,000)

 

10(vi.1) Glenshaw

 

11(A) Construction, acquisition,
12infrastructure and related costs for 
13the TAKTL facility

 

14Project Allocation

20,000,000

15(Base Project Allocation -
16$20,000,000)

 

17(vi.2) Greentree Borough

 

18(A) Acquisition, construction,
19infrastructure, redevelopment and
20other related costs for Parkway Center
21Mall

 

22Project Allocation

10,000,000

23(Base Project Allocation -
24$10,000,000)

 

25(vi.3) Harmar Township

 

26(A) Construction, infrastructure,
27redevelopment and other related costs
28for improvements to and expansion of
29PPG facility

 

30Project Allocation

10,000,000

1(Base Project Allocation -
2$10,000,000)

 

3(vii) McKees Rocks Borough

 

4(A) Construction, infrastructure and
5other related costs for Ohio Valley
6General Hospital Data and Information
7Technology Center

 

8Project Allocation

2,000,000

9(Base Project Allocation - $2,000,000)

 

10(B) Construction, acquisition,
11infrastructure and related costs for
12the Island Studios Expansion Project
13to include, but not be limited to, a
14film studio, hotel, museum, office and
15other development

 

16Project Allocation

10,000,000

17(Base Project Allocation -
18$10,000,000)

 

<-19(vii.1) Millvale Borough

 

20(A) Acquisition, infrastructure,
21redevelopment, abatement of hazardous
22materials and other related costs, for
23improvements in central business
24district

 

25Project Allocation

1,000,000

26(Base Project Allocation - $1,000,000)

 

27(viii) Moon Township

 

28(A) Construction, infrastructure
29improvements and other costs related
30to development of business park on

 

1site 7 at Pittsburgh International
2Airport

 

3Project Allocation

7,000,000

4(Base Project Allocation - $7,000,000)

 

5(B) Construction, infrastructure
6improvements and other costs related
7to development of Cherrington Commerce
8Center Phase II

 

9Project Allocation

10,000,000

10(Base Project Allocation -
11$10,000,000)

 

12(C) Acquisition, construction, site work
13and infrastructure improvements for a
14development project in Moon Township

 

15Project Allocation

10,000,000

16(Base Project Allocation -
17$10,000,000)

 

18(D) Acquisition, construction,
19infrastructure improvements and
20related costs for the development of
21an athletic and multipurpose arena at
22Robert Morris University

 

23Project Allocation

15,000,000

24(Base Project Allocation -
25$15,000,000)

 

<-26(E) Construction, acquisition,
27infrastructure and related costs for
28development of Omega Corporate Center
29project

 

30Project Allocation

5,000,000

1(Base Project Allocation - $5,000,000)

 

2(F) Construction, acquisition,
3infrastructure and related costs for
4development of Alpha Corporate Center
5project

 

6Project Allocation

25,000,000

7(Base Project Allocation -
8$25,000,000)

 

9(ix) Mt. Oliver Borough

 

10(A) Acquisition, construction,
11infrastructure and other related costs
12for Brownsville Road Corridor
13redevelopment projects

 

14Project Allocation

2,500,000

15(Base Project Allocation - $2,500,000)

 

<-16(ix.1) North Versailles Township

 

17(A) Acquisition, construction,
18infrastructure, redevelopment and
19other related costs for Pittsburgh
20Plaza East Shopping Center

 

21Project Allocation

20,000,000

22(Base Project Allocation -
23$20,000,000)

 

<-24(ix.1) (ix.2) Oakmont Borough

 

25(A) Construction, rehabilitation and
26other related costs for senior living
27project

 

28Project Allocation

2,950,000

29(Base Project Allocation - $2,950,000)

 

30(B) Construction, redevelopment,

 

1infrastructure, renovation, abatement
2of hazardous materials and other
3related costs for projects for
4Presbyterian SeniorCare Center

 

5Project Allocation

1,000,000

6(Base Project Allocation - $1,000,000)

 

<-7(ix.2) (ix.3) Penn Hills Township

 

8(A) Acquisition, construction and other
9related costs for emergency medical
10services building in Penn Hills

 

11Project Allocation

600,000

12(Base Project Allocation - $600,000)

 

13(x) Plum Borough

 

14(A) Construction, infrastructure
15improvements and other costs related
16to Plum Municipal Center

 

17Project Allocation

3,500,000

18(Base Project Allocation - $3,500,000)

 

19(xi) Robinson Township

 

20(A) Construction, infrastructure and
21other related costs for Bradley Center
22expansion project

 

23Project Allocation

500,000

24(Base Project Allocation - $500,000)

 

25(B) Acquisition, construction,
26infrastructure and other related costs
27for expansion of Industrial Scientific
28Global Headquarters

 

29Project Allocation

10,000,000

30(Base Project Allocation -

 

1$10,000,000)

 

<-2(C) Acquisition, construction,
3infrastructure, redevelopment and
4other related costs for development of
5business park

 

6Project Allocation

2,000,000

7(Base Project Allocation - $2,000,000)

 

8(D) Construction, acquisition,
9infrastructure and related costs for
10redevelopment of Marquis Office Plaza,
11including, but not limited to, a new
12parking garage

 

13Project Allocation

2,000,000

14(Base Project Allocation - $2,000,000)

 

15(xii) Ross Township

 

16(A) Acquisition, demolition,
17infrastructure and construction of
18public facilities in McKnight Road
19business corridor

 

20Project Allocation

2,250,000

21(Base Project Allocation - $2,250,000)

 

22(B) Acquisition, demolition,
23infrastructure and construction of
24public facilities for purposes of
25redevelopment of Northway Mall on
26McKnight Road

 

27Project Allocation

2,250,000

28(Base Project Allocation - $2,250,000)

 

29(C) Acquisition, demolition,
30infrastructure and construction of

 

1public facilities for parks,
2recreation and open space

 

3Project Allocation

4,000,000

4(Base Project Allocation - $4,000,000)

 

<-5(D) Acquisition, construction,
6infrastructure, redevelopment,
7abatement of hazardous materials and
8other related costs for The Perry
9Shops located on Perry Highway

 

10Project Allocation

10,000,000

11(Base Project Allocation -
12$10,000,000)

 

13(xiii) Sewickley Borough

 

14(A) Construction, infrastructure and
15other related costs for renovation of
165 South Patient Unit at Heritage
17Valley Sewickley Hospital facility

 

18Project Allocation

1,000,000

19(Base Project Allocation - $1,000,000)

 

20(B) Construction, infrastructure and
21other related costs for renovation and
22reconstruction of School of Nursing
23building at Heritage Valley Sewickley
24campus

 

25Project Allocation

1,000,000

26(Base Project Allocation - $1,000,000)

 

27(C) Construction, infrastructure and
28other related costs for the design,
29expansion and renovation of surgical
30services department at Heritage Valley

 

1Sewickley Hospital facility

 

2Project Allocation

1,000,000

3(Base Project Allocation - $1,000,000)

 

<-4(xiii.1) Sharpsburg Borough

 

5(A) Infrastructure and other related
6costs for water and sewer system
7improvements

 

8Project Allocation

1,850,000

9(Base Project Allocation - $1,850,000)

 

10(xiv) West Deer Township

 

11(A) Infrastructure, rehabilitation,
12construction and other related costs,
13including the abatement of hazardous
14materials, for development of senior
15citizen center

 

16Project Allocation

800,000

17(Base Project Allocation - $800,000)

 

18(xv) West Mifflin Borough

 

19(A) Acquisition, construction,
20infrastructure and other related costs
21for aviation, industrial and
22commercial site development and
23improvements at or surrounding
24Allegheny County Airport

 

25Project Allocation

20,000,000

26(Base Project Allocation -
27$20,000,000)

 

<-28(B) Acquisition, construction,
29infrastructure, redevelopment and
30other related costs for the

 

1development of a mixed-use facility

 

2Project Allocation

10,000,000

3(Base Project Allocation -
4$10,000,000)

 

<-5(xvi) White Oak Borough

 

6(A) Construction, infrastructure and
7other related costs for projects in
8White Oak Business District

 

9Project Allocation

1,500,000

10(Base Project Allocation - $1,500,000)

 

11(3) Armstrong County

 

12(i) County projects

 

13(A) Infrastructure, construction and
14other related costs for renovations to
15Belmont Complex indoor multiuse
16facility

 

17Project Allocation

1,500,000

18(Base Project Allocation - $1,500,000)

 

19(B) Acquisition, infrastructure,
20construction and other related costs,
21including abatement of hazardous
22materials, for public school buildings
23adaptive reuse project

 

24Project Allocation

5,000,000

25(Base Project Allocation - $5,000,000)

 

26(C) Acquisition, infrastructure,
27construction and other related costs
28for downtown revitalization projects,
29including façade improvements,
30landscaping, lighting, parking lots

 

1and streetscape improvements

 

2Project Allocation

2,000,000

3(Base Project Allocation - $2,000,000)

 

4(ii) Armstrong County Industrial Development
5Authority

 

6(A) Acquisition, infrastructure and
7construction for development of new
8industrial park

 

9Project Allocation

3,000,000

10(Base Project Allocation - $3,000,000)

 

11(4) Beaver County

 

<-12(i) County projects

 

13(A) Redevelopment, restoration and other
14related costs for the former
15Pittsburgh and Lake Erie Railroad
16passenger station to be used as a
17multipurpose meeting/event space

 

18Project Allocation

1,000,000

19(Base Project Allocation - $1,000,000)

 

20(B) Construction, infrastructure and
21other related costs for public works
22building and fire station in Big
23Beaver Borough

 

24Project Allocation

500,000

25(Base Project Allocation - $500,000)

 

26(ii) City of Aliquippa

 

27(A) Acquisition, construction,
28infrastructure and other related costs
29for business or manufacturing facility
30associated with the petrochemical

 

1industry

 

2Project Allocation

10,000,000

3(Base Project Allocation -
4$10,000,000)

 

5(i) <-(iii) Beaver County Corporation for
6Economic Development

 

7(A) Infrastructure, site improvements and
8other related costs for construction
9of compressed natural gas fueling
10facility

 

11Project Allocation

1,000,000

12(Base Project Allocation - $1,000,000)

 

13(B) Acquisition, infrastructure,
14abatement of hazardous materials,
15construction and other related costs
16for redevelopment of industrial
17properties located within Ellwood City

 

18Project Allocation

15,000,000

19(Base Project Allocation -
20$15,000,000)

 

21(C) Acquisition, infrastructure,
22abatement of hazardous materials,
23construction and other related costs
24for redevelopment and improvement of
25industrial sites located within Potter
26Township

 

27Project Allocation

15,000,000

28(Base Project Allocation -
29$15,000,000)

 

30(ii) <-(iv) Redevelopment Authority of Beaver

 

1County

 

2(A) Renovation and rehabilitation of
3patient rooms and corridors at
4Heritage Valley Beaver Hospital
5facility

 

6Project Allocation

1,000,000

7(Base Project Allocation - $1,000,000)

 

8(B) Rehabilitation, construction and
9other related costs for renovations to
10radiology department at Heritage
11Valley Beaver Hospital facility

 

12Project Allocation

1,000,000

13(Base Project Allocation - $1,000,000)

 

14(C) Infrastructure, construction and
15other related costs for rehabilitation
16and restoration of historic former
17Pittsburgh & Lake Erie Railroad
18passenger station

 

19Project Allocation

975,000

20(Base Project Allocation - $975,000)

 

<-21(v) Baden Borough

 

22(A) Acquisition, construction,
23infrastructure, redevelopment and
24other related costs for Baden Academy
25Charter School expansion project

 

26Project Allocation

5,000,000

27(Base Project Allocation - $5,000,000)

 

28(vi) Ellwood City Borough

 

29(A) Acquisition, construction,
30infrastructure, redevelopment,

 

1abatement of hazardous materials and
2other related costs for redevelopment
3projects

 

4Project Allocation

15,000,000

5(Base Project Allocation -
6$15,000,000)

 

7(vii) Franklin Township

<-

8(A) Construction and other related costs
9for Hereford Manor dams

 

10Project Allocation

7,500,000

11(Base Project Allocation - $7,500,000)

 

12(vii) Harmony Township

<-

13(viii) Harmony Township

<-

14(A) Construction, infrastructure and
15other related costs for CNG conversion
16project

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

<-19(B) Acquisition, construction,
20infrastructure, redevelopment and
21other related costs for an industrial
22park

 

23Project Allocation

20,000,000

24(Base Project Allocation -
25$20,000,000)

 

26(5) Bedford County

 

<-27(i) (Reserved)

 

<-28(i) County projects

 

29(A) Acquisition, construction,
30infrastructure and other related costs

 

1for rehabilitation of 8.5 miles of
2abandoned Pennsylvania Turnpike as
3multiuse trail.

 

4Project Allocation

4,000,000

5(Base Project Allocation - $4,000,000)

 

<-6(ii) Bedford County Development Association

 

7(A) Preparation of 90 acres of Bedford
8County Business Park II as shovel-
9ready sites to attract new businesses
10to the area

 

11Project Allocation

2,375,000

12(Base Project Allocation - $2,375,000)

 

13(6) Berks County

 

14(i) County projects

 

15(A) Acquisition, infrastructure,
16construction and other related costs
17for development of 104 acres for
18expansion of Reading Health System

 

19Project Allocation

3,500,000

20(Base Project Allocation - $3,500,000)

 

<-21(B) Acquisition, construction,
22infrastructure, redevelopment and
23other related costs for projects for
24Berks Community Health Center

 

25Project Allocation

15,000,000

26(Base Project Allocation -
27$15,000,000)

 

28(C) Rehabilitation of railroad, including
29track improvements, siding extensions,
30visitors center, equipment and

 

1equipment maintenance facility,
2construction and related work to
3enhance economic development
4opportunities and preserve corridor
5for future freight traffic in Berks
6and Montgomery Counties

 

7Project Allocation

10,000,000

8(Base Project Allocation -
9$10,000,000)

 

10(ii) Amity Township

 

11(A) Acquisition, infrastructure,
12construction and other related costs
13for development of retail and business
14park

 

15Project Allocation

1,300,000

16(Base Project Allocation - $1,300,000)

 

17(iii) Boyertown Borough

 

18(A) Construction, infrastructure and
19other related costs for rehabilitation
20of historic Civil War era railroad
21project

 

22Project Allocation

4,000,000

23(Base Project Allocation - $4,000,000)

 

24(iv) City of Reading

 

25(A) Construction, infrastructure and
26other related costs for early learning
27center at Albright College

 

28Project Allocation

1,500,000

29(Base Project Allocation - $1,500,000)

 

30(B) Construction, infrastructure and

 

1other related costs for Albright
2College Co-Generation Plant expansion
3project

 

4Project Allocation

2,500,000

5(Base Project Allocation - $2,500,000)

 

6(C) Construction, infrastructure and
7other related costs for Albright
8College Track and Field Facility
9project

 

10Project Allocation

1,500,000

11(Base Project Allocation - $1,500,000)

 

12(D) Construction, infrastructure and
13other related costs for Albright
14College Library Holocaust Resource
15Center project

 

16Project Allocation

500,000

17(Base Project Allocation - $500,000)

 

18(E) Renovation, restoration,
19reconstruction, infrastructure
20improvements and related costs for
21Reading Public Museum

 

22Project Allocation

1,112,000

23(Base Project Allocation - $1,112,000)

 

24(F) Construction, infrastructure
25improvements and other related costs
26for installation of natural gas
27refueling station at Evergreen
28Community Power site

 

29Project Allocation

5,000,000

30(Base Project Allocation - $5,000,000)

 

1(G) Construction, reconstruction,
2rehabilitation, remediation,
3infrastructure improvements and other
4related costs for redevelopment of
5existing building at Evergreen
6Community Power site

 

7Project Allocation

5,000,000

8(Base Project Allocation - $5,000,000)

 

9(H) Rehabilitation, construction and
10renovation of rail infrastructure to
11service Evergreen Community Power
12site, including track construction and
13rebuild, property and right-of-way
14acquisition, design, engineering,
15permitting, rails, ties, ballast,
16crossings, switches, turnouts, repair
17of grade crossings, track and other
18repairs and rebuilds, construction of
19rail service and any other related
20costs

 

21Project Allocation

5,000,000

22(Base Project Allocation - $5,000,000)

 

23(I) Construction, infrastructure
24improvements and related costs for the
25Reading Area Community College Berks
26Hall renovation and conservation
27project

 

28Project Allocation

600,000

29(Base Project Allocation - $600,000)

 

30(J) Construction, infrastructure

 

1improvements and related costs for the
2Reading Area Community College
3pedestrian safety, gateway and traffic
4improvement project

 

5Project Allocation

1,178,000

6(Base Project Allocation - $1,178,000)

 

<-7(iv.1) Cumru Township

 

8(A) Acquisition, construction,
9infrastructure, development and other
10costs related to development of
11industrial site for new and expanding
12businesses

 

13Project Allocation

20,000,000

14(Base Project Allocation -
15$20,000,000)

 

16(v) Exeter Township

 

17(A) Construction, infrastructure and
18other related costs for Lincoln
19Business Park redevelopment project

 

20Project Allocation

5,000,000

21(Base Project Allocation - $5,000,000)

 

22(B) Construction, site preparation,
23infrastructure improvements and
24related costs for new Emergency
25Services Building

 

26Project Allocation

2,500,000

27(Base Project Allocation - $2,500,000)

 

28(vi) Fleetwood Borough

 

29(A) Acquisition, infrastructure,
30renovations and other related costs

 

1for Fleetwood Tannery/Fleetwood Auto
2Body Complex project

 

3Project Allocation

5,000,000

4(Base Project Allocation - $5,000,000)

 

5(B) Acquisition, infrastructure,
6renovations and other related costs
7for revitalization of Fleetwood
8Borough Central Business District

 

9Project Allocation

2,500,000

10(Base Project Allocation - $2,500,000)

 

11(vi.1) Kutztown Borough

 

12(A) Revitalization of
13industrial/commercial sites, including
14acquisition, rehabilitation,
15construction, infrastructure
16development and related costs

 

17Project Allocation

5,000,000

18(Base Project Allocation - $5,000,000)

 

<-19(B) Acquisition, demolition,
20construction, rehabilitation and
21redevelopment of multiple properties
22to create a municipal government
23center

 

24Project Allocation

1,000,000

25(Base Project Allocation - $1,000,000)

 

<-26(vi.2) Leesport Borough

 

27(A) Construction, renovation and other
28related costs for fire station

 

29Project Allocation

1,250,000

30(Base Project Allocation - $1,250,000)

 

<-1(vi.2) (vi.3) Lyons Borough

 

2(A) Construction, infrastructure,
3abatement of hazardous materials and
4other related costs for the
5redevelopment and rehabilitation of
6manufacturing facility

 

7Project Allocation

17,000,000

8(Base Project Allocation -
9$17,000,000)

 

10(vii) Muhlenberg Township

 

11(A) Acquisition, infrastructure,
12renovations and other related costs
13for NKG Metals facility redevelopment
14and reuse project

 

15Project Allocation

5,000,000

16(Base Project Allocation - $5,000,000)

 

17(B) Acquisition, infrastructure,
18renovations and other related costs
19for Fifth Street Highway Corridor
20revitalization project

 

21Project Allocation

10,000,000

22(Base Project Allocation -
23$10,000,000)

 

<-24(viii) Snyder Township

 

25(A) Renovation and other related costs to
26replace and upgrade facility
27infrastructure of Tyrone Hospital

 

28Project Allocation

1,650,000

29(Base Project Allocation - $1,650,000)

 

30(ix) Borough of Topton

 

1(A) Construction, infrastructure and
2other related costs for renovations to
3historic Old Main building of Diakon
4Lutheran Home at Topton

 

5Project Allocation

3,000,000

6(Base Project Allocation - $3,000,000)

 

7(viii) <-(x) West Reading Borough

 

8(A) Acquisition, infrastructure,
9renovations and other related costs
10for Reading Health System surgical
11tower and related facilities

 

12Project Allocation

3,500,000

13(Base Project Allocation - $3,500,000)

 

14(7) Blair County

 

<-15(i) City of Altoona

 

16(A) Construction, infrastructure and
17other related costs for the expansion
18of Altoona Regional Health System,
19including new operating rooms,
20additional lab space and vision center

 

21Project Allocation

1,000,000

22(Base Project Allocation - $1,000,000)

 

23(i) <-(ii) Altoona-Blair County Development
24Corporation

 

25(A) Acquisition, abatement of hazardous
26materials, renovations and
27rehabilitation of regional arts center

 

28Project Allocation

2,000,000

29(Base Project Allocation - $2,000,000)

 

30(8) Bradford County

 

<-1(i) (Reserved)

 

2(ii) Borough of Towanda

 

3(A) Acquisition, construction,
4infrastructure and other related costs
5for expansion of Memorial Hospital

 

6Project Allocation

5,000,000

7(Base Project Allocation - $5,000,000)

 

8(i) (iii)<- Wyalusing Township

 

9(A) Acquisition, site preparation,
10remediation, infrastructure
11improvements and construction of
12Wyalusing Professional Park

 

13Project Allocation

8,000,000

14(Base Project Allocation - $8,000,000)

 

15(9) Bucks County

 

16(i) County projects

 

17(A) Acquisition, construction,
18infrastructure, redevelopment and
19other related costs for ARIA Health
20System urgent care facilities

 

21Project Allocation

1,000,000

22(Base Project Allocation - $1,000,000)

 

23(B) Acquisition, construction,
24infrastructure, redevelopment and
25other related costs for ARIA Health
26System facilities to provide medical
27services, conduct research and other
28related activities

 

29Project Allocation

10,000,000

30(Base Project Allocation -

 

1$10,000,000)

 

2(C) Acquisition, infrastructure,
3redevelopment, construction and other
4related costs for Fairless Hills rail
5expansion project at Keystone
6Industrial Port Complex

 

7Project Allocation

5,750,000

8(Base Project Allocation - $5,750,000)

 

9(D) Acquisition, rehabilitation,
10construction and other related costs
11for renovation of former warehouse
12space and development of
13entrepreneurial scientists research
14clusters

 

15Project Allocation

4,500,000

16(Base Project Allocation - $4,500,000)

 

17(ii) Bucks County Industrial Development
18Authority

 

19(A) Acquisition, infrastructure,
20redevelopment and other related costs
21for construction of rail service to
22Riverside Industrial Park

 

23Project Allocation

2,100,000

24(Base Project Allocation - $2,100,000)

 

25(iii) Redevelopment Authority of Bucks County

 

26(A) Acquisition, infrastructure,
27construction and other related costs
28for rehabilitation of Grundy
29Powerhouse

 

30Project Allocation

525,000

1(Base Project Allocation - $525,000)

 

2(B) Acquisition, infrastructure,
3construction and other related costs
4for rehabilitation and development of
5PECO building in Penndel Borough

 

6Project Allocation

600,000

7(Base Project Allocation - $600,000)

 

8(C) Acquisition, infrastructure,
9construction and other related costs
10for redevelopment of Stocks Waterfront
11into mixed-use facility

 

12Project Allocation

780,000

13(Base Project Allocation - $780,000)

 

14(D) Acquisition, infrastructure,
15redevelopment, construction and other
16related costs for infrastructure
17improvements to Route 13 Industrial
18Corridor

 

19Project Allocation

1,100,000

20(Base Project Allocation - $1,100,000)

 

21(E) Acquisition, infrastructure,
22construction and other related costs
23for redevelopment of USI Lighting
24manufacturing site

 

25Project Allocation

1,200,000

26(Base Project Allocation - $1,200,000)

 

27(F) Infrastructure, construction and
28other related costs for improvements
29to Edgely Industrial Park, including
30roadways, storm water management,

 

1lighting and other infrastructure

 

2Project Allocation

1,200,000

3(Base Project Allocation - $1,200,000)

 

4(G) Acquisition, infrastructure,
5construction and other related costs
6for demolition of Mill Run Retirement
7Community and redevelopment of
8property

 

9Project Allocation

1,200,000

10(Base Project Allocation - $1,200,000)

 

11(H) Acquisition, demolition,
12infrastructure improvements,
13construction, renovation and other
14related costs for development of
15public/private academic university

 

16Project Allocation

4,000,000

17(Base Project Allocation - $4,000,000)

 

18(I) Infrastructure, construction,
19redevelopment and other related costs
20for senior housing project in Telford

 

21Project Allocation

10,000,000

22(Base Project Allocation -
23$10,000,000)

 

24(iv) Bensalem Township

 

25(A) Acquisition, infrastructure and other
26costs related to construction of new
27Newport fire house

 

28Project Allocation

1,500,000

29(Base Project Allocation - $1,500,000)

 

<-30(B) Renovation, rehabilitation and other

 

1related costs for historic Growden
2Mansion

 

3Project Allocation

500,000

4(Base Project Allocation - $500,000)

 

5(C) Construction and other related costs
6for affordable housing for disabled
7veterans

 

8Project Allocation

5,000,000

9(Base Project Allocation - $5,000,000)

 

10(D) Construction and other related costs
11for transitional housing for women who
12have completed their treatment program
13but still struggle with homelessness

 

14Project Allocation

600,000

15(Base Project Allocation - $600,000)

 

16(E) Construction, infrastructure,
17redevelopment and other related costs
18for family and community outreach
19center that offers recovery services
20to individuals with addictions

 

21Project Allocation

1,000,000

22(Base Project Allocation - $1,000,000)

 

23(F) Acquisition, construction,
24infrastructure, redevelopment and
25other related costs for a cultural and
26community center with business
27district improvements

 

28Project Allocation

2,500,000

29(Base Project Allocation - $2,500,000)

 

30(G) Construction and other related costs

 

1for new access road to assist in
2redevelopment of industrial zone

 

3Project Allocation

2,000,000

4(Base Project Allocation - $2,000,000)

 

5(H) Construction, infrastructure,
6redevelopment and other related costs
7for residential drug and alcohol
8addiction treatment facility for first
9responders, corrections officers and
10combat veterans who are seeking
11inpatient treatment

 

12Project Allocation

500,000

13(Base Project Allocation - $500,000)

 

14(iv.1) Bristol Township

 

15(A) Construction, acquisition and other
16related costs to redevelop and
17revitalize vacant portion of Lower
18Bucks Hospital for treatment and
19rehabilitation facility

 

20Project Allocation

1,100,000

21(Base Project Allocation - $1,100,000)

 

22(B) Acquisition, construction,
23infrastructure, redevelopment and
24other related costs for public health
25and safety projects in Bristol Borough
26and Bristol Township

 

27Project Allocation

4,000,000

28(Base Project Allocation - $4,000,000)

 

29(iv.2) Bristol Borough

 

30(A) Construction, infrastructure and

 

1other related costs for projects along
2Otter Creek and Adams Hollow Creek

 

3Project Allocation

1,000,000

4(Base Project Allocation - $1,000,000)

 

5(v) Chalfont Borough

 

6(A) Acquisition, construction,
7infrastructure, pedestrian
8enhancements and other costs related
9to transit-oriented development and
10downtown revitalization

 

11Project Allocation

10,000,000

12(Base Project Allocation -
13$10,000,000)

 

<-14(v.1) Doylestown Borough

 

15(A) Acquisition, construction,
16infrastructure, renovation and other
17related costs for redevelopment of
18PennDOT maintenance site facility for
19urban park and office space

 

20Project Allocation

1,415,000

21(Base Project Allocation - $1,415,000)

 

22(B) Construction, reconstruction and
23other related costs for Doylestown
24Hospital maternity center

 

25Project Allocation

1,100,000

26(Base Project Allocation - $1,100,000)

 

<-27(v.2) Falls Township

 

28(A) Acquisition, infrastructure, rail
29improvements and other related costs
30for development of industrial facility

 

1at Keystone Industrial Port Complex

 

2Project Allocation

15,000,000

3(Base Project Allocation -
4$15,000,000)

 

5(vi) Lower Southampton Township

 

6(A) Infrastructure, construction,
7renovations and other related costs
8for new public works building

 

9Project Allocation

1,000,000

10(Base Project Allocation - $1,000,000)

 

11(B) Acquisition, infrastructure,
12construction and other related costs
13for new police department headquarters

 

14Project Allocation

2,000,000

15(Base Project Allocation - $2,000,000)

 

<-16(C) Construction, redevelopment,
17renovation and other related costs for
18Lower Southampton Firehouse

 

19Project Allocation

500,000

20(Base Project Allocation - $500,000)

 

21(D) Construction, infrastructure,
22redevelopment, acquisition and other
23related costs for new police station

 

24Project Allocation

2,000,000

25(Base Project Allocation - $2,000,000)

 

26(E) Construction, infrastructure,
27redevelopment and other related costs
28for new public works building

 

29Project Allocation

1,000,000

30(Base Project Allocation - $1,000,000)

 

1(vii) Middletown Township

 

2(A) Infrastructure, construction,
3rehabilitation and other related costs
4for roadway improvements to Big Oak
5Road, located within industrial park

 

<-6Project Allocation

600,000

7(Base Project Allocation - $600,000)

 

<-8Project Allocation

800,000

9(Base Project Allocation - $800,000)

 

10(B) Infrastructure, construction and
11other related costs for rehabilitation
12of municipal building

 

13Project Allocation

1,000,000

14(Base Project Allocation - $1,000,000)

 

15(C) Acquisition, infrastructure,
16construction and other related costs
17for redevelopment of school buildings
18for future public use

 

19Project Allocation

2,000,000

20(Base Project Allocation - $2,000,000)

 

<-21(D) Construction, renovation,
22infrastructure and other related costs
23for expansion of St. Mary Medical
24Center

 

25Project Allocation

25,000,000

26(Base Project Allocation -
27$25,000,000)

 

28(E) Construction, acquisition,
29infrastructure and other related costs
30for redevelopment of former school

 

1building for public use

 

2Project Allocation

2,000,000

3(Base Project Allocation - $2,000,000)

 

4(F) Construction, renovation,
5infrastructure and other related costs
6for municipal building in disrepair

 

7Project Allocation

1,000,000

8(Base Project Allocation - $1,000,000)

 

9(vii.1) Milford Township

 

10(A) Land acquisition, construction,
11infrastructure and other related costs
12for development and expansion of
13hospital

 

14Project Allocation

15,000,000

15(Base Project Allocation -
16$15,000,000)

 

17(viii) Northampton Township

 

18(A) Acquisition, infrastructure,
19construction and other related costs
20for a new police department
21headquarters and renovations to
22existing facilities

 

23Project Allocation

2,500,000

24(Base Project Allocation - $2,500,000)

 

25(ix) Quakertown Borough

 

26(A) Acquisition, infrastructure,
27construction and other related costs
28for new downtown infill project
29consisting of office and retail
30complex

 

1Project Allocation

3,500,000

2(Base Project Allocation - $3,500,000)

 

<-3(ix.1) Upper Southampton Township

 

4(A) Construction and other related costs
5for new public works building and
6renovation of existing public works
7building for general government use

 

8Project Allocation

1,250,000

9(Base Project Allocation - $1,250,000)

 

10(B) Land acquisition for recreation and
11open space

 

12Project Allocation

1,000,000

13(Base Project Allocation - $1,000,000)

 

14(x) Warwick Township

 

15(A) Acquisition, infrastructure,
16construction and other related costs
17for township building renovations and
18upgrades

 

19Project Allocation

1,000,000

20(Base Project Allocation - $1,000,000)

 

21(B) Infrastructure, construction,
22rehabilitation and other related costs
23for roadway improvements to Stout
24Drive, which provides ingress and
25egress to industrial park

 

26Project Allocation

1,500,000

27(Base Project Allocation - $1,500,000)

 

28(10) Butler County

 

29(i) Butler County Redevelopment Authority

 

30(A) Site preparation activity, including

 

1onsite utility construction, on
2property along SR 0019 in Jackson
3Township to support mixed-use
4development

 

5Project Allocation

10,000,000

6(Base Project Allocation -
7$10,000,000)

 

8(B) Construction of infrastructure,
9capital facilities and site
10development activities for
11construction of a mixed-use
12development in Route 228 corridor

 

13Project Allocation

10,000,000

14(Base Project Allocation -
15$10,000,000)

 

16(ii) Cranberry Township

 

17(A) Acquisition, infrastructure,
18rehabilitation and other related costs
19for construction of public plaza and
20other amenities in Route 228 corridor

 

21Project Allocation

1,000,000

22(Base Project Allocation - $1,000,000)

 

23(B) Acquisition, infrastructure,
24construction and other related costs
25for expansion of North Boundary Park

 

26Project Allocation

1,000,000

27(Base Project Allocation - $1,000,000)

 

28(C) Acquisition, infrastructure,
29construction, and other related costs,
30including abatement of hazardous

 

1materials, for Fernway redevelopment
2project

 

3Project Allocation

1,500,000

4(Base Project Allocation - $1,500,000)

 

5(D) Acquisition, construction, site
6development and infrastructure costs
7related to economic development
8project in Commonwealth and Executive
9Drive corridor

 

10Project Allocation

2,500,000

11(Base Project Allocation - $2,500,000)

 

12(E) Acquisition, infrastructure,
13rehabilitation and other related costs
14for construction of new public library

 

15Project Allocation

2,500,000

16(Base Project Allocation - $2,500,000)

 

17(F) Acquisition, rehabilitation, site
18development and infrastructure costs
19related to economic development
20project in Route 228 corridor

 

21Project Allocation

4,000,000

22(Base Project Allocation - $4,000,000)

 

23(G) Acquisition, rehabilitation, site
24development and infrastructure costs
25related to economic development
26project in Route 19 corridor

 

27Project Allocation

5,000,000

28(Base Project Allocation - $5,000,000)

 

29(H) Acquisition, infrastructure,
30construction and other costs for

 

1redevelopment and implementation of
2Route 19 Main Street program

 

3Project Allocation

5,000,000

4(Base Project Allocation - $5,000,000)

 

5(iii) Zelienople Borough

 

6(A) Acquisition, infrastructure,
7construction and renovations of Main
8Street corridor as part of Central
9Business District revitalization
10project.

 

11Project Allocation

3,900,000

12(Base Project Allocation - $3,900,000)

 

<-13(B) Construction, infrastructure,
14redevelopment and other related costs
15for development of Sensory House
16Museum on Glade Run's Zelienople
17campus for individuals with autism and
18other developmental disabilities

 

19Project Allocation

1,000,000

20(Base Project Allocation - $1,000,000)

 

21(C) Construction, redevelopment and other
22related costs for development of
23Jeremiah Village, a residential
24community for individuals with autism

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(D) Construction, infrastructure,
28redevelopment and other related costs
29for learning center and chapel on
30Zelienople campus of Glade Run

 

1Lutheran Services

 

2Project Allocation

750,000

3(Base Project Allocation - $750,000)

 

4(11) Cambria County

 

5(i) County projects

 

6(A) Acquisition, construction, site
7development, infrastructure and
8transportation improvements and other
9related costs for Conemaugh Health
10System for an ambulatory care center

 

11Project Allocation

5,000,000

12(Base Project Allocation - $5,000,000)

 

<-13(B) Acquisition, construction,
14infrastructure, redevelopment,
15abatement of hazardous materials and
16other related costs for acid mine
17drainage cleanup infrastructure

 

18Project Allocation

10,000,000

19(Base Project Allocation -
20$10,000,000)

 

21(C) Acquisition, construction,
22infrastructure and other related costs
23for ambulatory care center

 

24Project Allocation

5,000,000

25(Base Project Allocation - $5,000,000)

 

26(D) Acquisition, construction,
27infrastructure, abatement of hazardous
28materials and other related costs for
29economic development project

 

30Project Allocation

5,000,000

1(Base Project Allocation - $5,000,000)

 

2(E) Acquisition, construction,
3infrastructure and other related costs
4for natural gas refueling station

 

5Project Allocation

1,000,000

6(Base Project Allocation - $1,000,000)

 

7(F) Acquisition, construction,
8infrastructure and other related costs
9for natural gas refueling station in
10Cambria County Industrial Park

 

11Project Allocation

5,000,000

12(Base Project Allocation - $5,000,000)

 

13(G) Acquisition, construction,
14infrastructure and other related costs
15for outdoor recreational tourism
16facility and related projects

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(H) Rehabilitation, construction and
20renovation of rail infrastructure to
21serve an economic development project

 

22Project Allocation

10,000,000

23(Base Project Allocation -
24$10,000,000)

 

25(ii) Cambria Township

 

26(A) Construction, infrastructure and
27other related costs for Cambria County
28Prison improvement project

 

29Project Allocation

2,500,000

30(Base Project Allocation - $2,500,000)

 

1(B) Acquisition, construction,
2infrastructure improvements and other
3related costs for the installation of
4a natural gas refueling station in
5Cambria County Industrial Park

 

6Project Allocation

5,000,000

7(Base Project Allocation - $5,000,000)

 

<-8(C) Construction, infrastructure and
9other related costs for natural gas-
10powered data center expansion

 

11Project Allocation

5,000,000

12(Base Project Allocation - $5,000,000)

 

13(iii) City of Johnstown

 

14(A) Construction, infrastructure and
15other related costs for Cambria County
16War Memorial improvement project

 

17Project Allocation

1,250,000

18(Base Project Allocation - $1,250,000)

 

19(B) Construction, reconstruction,
20rehabilitation, remediation
21infrastructure improvements and other
22related costs for the redevelopment
23and reuse of historic Conrad Building

 

24Project Allocation

3,000,000

25(Base Project Allocation - $3,000,000)

 

26(C) Acquisition, construction,
27reconstruction, rehabilitation,
28upgrades, related infrastructure
29improvements, including street-scape
30and pedestrian improvements and other

 

1related costs for Conemaugh Medical
2Park

 

3Project Allocation

5,000,000

4(Base Project Allocation - $5,000,000)

 

5(D) Demolition and construction of
6various properties to revitalize the
7commercial, retail and housing
8districts within the city and related
9infrastructure

 

10Project Allocation

10,000,000

11(Base Project Allocation -
12$10,000,000)

 

<-13(E) Acquisition, construction,
14infrastructure, redevelopment,
15abatement of hazardous materials and
16other related costs for acid mine
17drainage and alternative energy
18projects

 

19Project Allocation

10,000,000

20(Base Project Allocation -
21$10,000,000)

 

22(F) Acquisition, construction,
23infrastructure, redevelopment,
24abatement of hazardous materials and
25other related costs for a new
26education facility

 

27Project Allocation

5,000,000

28(Base Project Allocation - $5,000,000)

 

29(G) Acquisition, construction,
30infrastructure, redevelopment,

 

1abatement of hazardous materials and
2other related costs for emergency
3department project

 

4Project Allocation

7,500,000

5(Base Project Allocation - $7,500,000)

 

6(H) Acquisition, construction,
7infrastructure and other related costs
8for projects related to Conemaugh
9Medical Park

 

10Project Allocation

5,000,000

11(Base Project Allocation - $5,000,000)

 

12(I) Construction, infrastructure,
13redevelopment, abatement of hazardous
14materials and other related costs for
15redevelopment project at site of
16former Conrad building

 

17Project Allocation

3,000,000

18(Base Project Allocation - $3,000,000)

 

19(J) Construction, infrastructure and
20other related costs for projects
21relating to Johnstown Public Safety
22Building

 

23Project Allocation

500,000

24(Base Project Allocation - $500,000)

 

25(K) Construction, infrastructure and
26other related costs for Point Stadium
27projects

 

28Project Allocation

500,000

29(Base Project Allocation - $500,000)

 

30(iv) Cresson Township

 

1(A) Construction, demolition,
2renovations, infrastructure and other
3costs related to expansion of the
4campus of Mt. Aloysius College

 

5Project Allocation

20,000,000

6(Base Project Allocation -
7$20,000,000)

 

8(v) Ebensburg Borough

 

9(A) Construction, infrastructure and
10other related costs for Cambria County
11Courthouse renovation project

 

12Project Allocation

500,000

13(Base Project Allocation - $500,000)

 

14(vi) Hastings Borough

 

15(A) Acquisition, construction,
16reconstruction, rehabilitation,
17upgrade, infrastructure improvements
18and other related costs for the
19Conemaugh Miners Medical Center in
20Hastings and surrounding
21municipalities

 

22Project Allocation

5,000,000

23(Base Project Allocation - $5,000,000)

 

<-24(B) Acquisition, construction,
25infrastructure and other related costs
26for medical center projects in the
27borough and surrounding municipalities

 

28Project Allocation

5,000,000

29(Base Project Allocation - $5,000,000)

 

30(vii) Loretto Borough

 

1(A) Construction, infrastructure and
2other related costs for renovation and
3expansion of Saint Francis University
4School of Health Sciences complex

 

5Project Allocation

10,000,000

6(Base Project Allocation -
7$10,000,000)

 

<-8(viii) Richland Township

 

9(A) Acquisition, construction,
10infrastructure, redevelopment,
11abatement of hazardous materials and
12other related costs for ambulatory
13care center

 

14Project Allocation

5,000,000

15(Base Project Allocation - $5,000,000)

 

16(12) Cameron County

 

17(i) County projects

 

18(A) Acquisition, infrastructure,
19construction and other related costs
20for economic project in the county

 

21Project Allocation

10,000,000

22(Base Project Allocation -
23$10,000,000)

 

24(13) Carbon County

 

25(i) County projects

 

26(A) Site development, infrastructure,
27redevelopment, construction and other
28costs related to construction of
29educational facility in Carbon County

 

30Project Allocation

4,800,000

1(Base Project Allocation - $4,800,000)

 

2(B) Construction, site development,
3infrastructure and other costs related
4to construction of educational
5facility for Lehigh Carbon Community
6College

 

7Project Allocation

4,000,000

8(Base Project Allocation - $4,000,000)

 

9(C) Construction, infrastructure and
10other related costs for Blue Mountain
11Health Systems renovation projects at
12Palmerton Hospital and Gnaden Huetten
13Memorial Hospital campuses

 

14Project Allocation

1,000,000

15(Base Project Allocation - $1,000,000)

 

16(D) Acquisition, construction,
17infrastructure, redevelopment,
18renovations and other costs associated
19with an economic development project
20in the county

 

21Project Allocation

7,500,000

22(Base Project Allocation - $7,500,000)

 

<-23(ii) Nesquehoning Borough

 

24(A) Construction, renovation and other
25related costs for expansion of Carbon
26County Correctional Facility

 

27Project Allocation

1,500,000

28(Base Project Allocation - $1,500,000)

 

29(14) Centre County

 

30(i) County projects

 

1(A) Acquisition, infrastructure,
2construction and other related costs
3for wildlife education center

 

4Project Allocation

3,000,000

5(Base Project Allocation - $3,000,000)

 

6(B) Acquisition, infrastructure,
7construction and other related costs
8for development of expanded natural
9gas services

 

10Project Allocation

5,000,000

11(Base Project Allocation - $5,000,000)

 

12(C) Acquisition, infrastructure,
13construction and other related costs
14for rehabilitation and expansion of
15Memorial Field and Central Parklet,
16located in State College Borough

 

17Project Allocation

8,000,000

18(Base Project Allocation - $8,000,000)

 

19(D) Acquisition, infrastructure,
20construction and other related costs
21for centralized, all-inclusive YMCA
22multisports facility

 

23Project Allocation

10,000,000

24(Base Project Allocation -
25$10,000,000)

 

<-26(E) Construction, infrastructure,
27acquisition and other related costs
28for development of natural gas
29services

 

30Project Allocation

5,000,000

1(Base Project Allocation - $5,000,000)

 

2(F) Construction, rehabilitation, site
3upgrades, connector road to Penn Eagle
4Industrial Park, loading equipment,
5building upgrades, access system and
6other related costs for development of
7a centralized transloading site at
8Titan Energy Park

 

9Project Allocation

5,000,000

10(Base Project Allocation - $5,000,000)

 

11(G) Acquisition, construction,
12infrastructure and other related costs
13for development of natural gas
14services

 

15Project Allocation

5,000,000

16(Base Project Allocation - $5,000,000)

 

17(ii) Moshannon Valley Economic Development
18Partnership

 

19(A) Acquisition, infrastructure,
20construction and other related costs
21for medical building in medically
22underserved area

 

23Project Allocation

2,000,000

24(Base Project Allocation - $2,000,000)

 

<-25(iii) Geisinger Authority

 

26(A) Construction, infrastructure,
27redevelopment, renovation and other
28related costs for expanded access to
29primary and specialty care project

 

30Project Allocation

3,000,000

1(Base Project Allocation - $3,000,000)

 

<-2(iii.1) Bellefonte Borough

 

3(A) Redevelopment of downtown area in
4Bellefonte Borough, including
5construction and related
6infrastructure

 

7Project Allocation

5,000,000

8(Base Project Allocation - $5,000,000)

 

9(iv) Centre Hall Borough/Potter Township

 

10(A) Construction, infrastructure and
11other related costs for new fire hall

 

12Project Allocation

2,500,000

13(Base Project Allocation - $2,500,000)

 

14(v) College Township

 

15(A) Construction, infrastructure and
16other related costs for development of
17compressed natural gas fueling station
18for Centre County Recycling and Refuse
19Authority operations

 

20Project Allocation

500,000

21(Base Project Allocation - $500,000)

 

22(vi) State College Borough

 

23(A) Construction, infrastructure and
24other related costs for mixed-use
25development, including retail, hotel,
26residential and parking

 

27Project Allocation

5,000,000

28(Base Project Allocation - $5,000,000)

 

29(15) Chester County

 

30(i) County projects

 

1(A) Acquisition, infrastructure,
2renovations and other related costs
3for improvement to park facilities

 

4Project Allocation

5,000,000

5(Base Project Allocation - $5,000,000)

 

6(B) Acquisition, infrastructure,
7renovations, rehabilitation and other
8related costs for community
9revitalization projects

 

10Project Allocation

5,000,000

11(Base Project Allocation - $5,000,000)

 

12(C) Acquisition, infrastructure,
13renovations, rehabilitation and other
14related costs for economic development
15projects

 

16Project Allocation

5,000,000

17(Base Project Allocation - $5,000,000)

 

18(D) Construction, infrastructure and
19other related costs for Valley Forge
20Christian College Athletic Facilities
21expansion project

 

22Project Allocation

2,000,000

23(Base Project Allocation - $2,000,000)

 

24(E) Construction, infrastructure and
25other related costs for renovation of
26existing Technical High School
27Pickering Campus

 

28Project Allocation

2,400,000

29(Base Project Allocation - $2,400,000)

 

30(ii) Chester County Economic Development

 

1Council

 

2(A) Acquisition, infrastructure,
3construction, streetscape
4improvements, industrial and
5commercial site development and other
6capital revitalization in Borough of
7Kennett Square

 

8Project Allocation

10,000,000

9(Base Project Allocation -
10$10,000,000)

 

11(B) Acquisition, infrastructure,
12construction, commercial development
13and other related costs for Route 1
14corridor in southern Chester County

 

15Project Allocation

15,000,000

16(Base Project Allocation -
17$15,000,000)

 

18(iii) Chester County Industrial Development
19Authority

 

<-20(A) Acquisition, infrastructure,
21construction and other related costs
22for development of commercial center
23in East Brandywine Township

 

24Project Allocation

2,500,000

25(Base Project Allocation - $2,500,000)

 

<-26(B) (A) Acquisition, demolition,
27infrastructure, construction and other
28related costs, including abatement of
29hazardous materials, for multisite,
30transit-oriented redevelopment project

 

1in City of Coatesville. Redevelopment
2to include reconstruction of
3infrastructure, renovation of historic
4facilities and new construction

 

5Project Allocation

10,000,000

6(Base Project Allocation -
7$10,000,000)

 

<-8(C) (B) Acquisition, construction,
9infrastructure and other related costs
10for renovation of historical cultural
11center

 

12Project Allocation

1,000,000

13(Base Project Allocation - $1,000,000)

 

<-14(C) Construction, infrastructure,
15redevelopment, site preparation,
16demolition and other related costs to
17support redevelopment of Devault
18Quarry

 

19Project Allocation

8,000,000

20(Base Project Allocation - $8,000,000)

 

21(D) Acquisition, site preparation,
22infrastructure, demolition and
23construction costs to support
24redevelopment of two previously
25utilized sites for commercial
26development project in West Goshen
27Township

 

28Project Allocation

1,000,000

29(Base Project Allocation - $1,000,000)

 

30(E) Acquisition, site preparation,

 

1infrastructure and construction costs
2to support construction of grocery-
3anchored, 65,000-square-foot
4commercial center and placement of
5significant new infrastructure in East
6Brandywine Township

 

7Project Allocation

2,500,000

8(Base Project Allocation - $2,500,000)

 

9(iii.1) Downingtown Borough

 

10(A) Construction, infrastructure,
11acquisition and related costs for
12development and expansion of
13Downingtown Transportation Center

 

14Project Allocation

5,000,000

15(Base Project Allocation - $5,000,000)

 

<-16(iii.2) Easttown Township

 

17(A) Construction, renovation, demolition,
18abatement of hazardous materials and
19other related costs for fire company
20apparatus building

 

21Project Allocation

4,000,000

22(Base Project Allocation - $4,000,000)

 

23(iv) East Whiteland Township

 

24(A) Construction, infrastructure
25improvements and other costs related
26to People's Theatre Phase III
27expansion project

 

28Project Allocation

1,000,000

29(Base Project Allocation - $1,000,000)

 

30(B) Construction, infrastructure

 

1improvements and other costs related
2to Immaculata University building
3projects

 

4Project Allocation

8,000,000

5(Base Project Allocation - $8,000,000)

 

6(v) Malvern Borough

 

7(A) Construction, infrastructure,
8acquisition and related costs
9associated with reuse and development
10projects

 

11Project Allocation

5,000,000

12(Base Project Allocation - $5,000,000)

 

13(vi) Phoenixville Borough

 

14(A) Construction, infrastructure
15improvements and other costs related
16to Colonial Theatre expansion project

 

17Project Allocation

4,000,000

18(Base Project Allocation - $4,000,000)

 

19(B) Mixed-use development, including
20construction, infrastructure,
21acquisition and related costs at
22former Phoenix Steel site

 

23Project Allocation

5,000,000

24(Base Project Allocation - $5,000,000)

 

<-25(C) Construction, acquisition,
26infrastructure, redevelopment and
27other related costs for parking garage
28and reconstruction of transit service
29trestle bridge

 

30Project Allocation

2,000,000

1(Base Project Allocation - $2,000,000)

 

2(D) Construction, renovation and other
3related costs for upgrades to Reeves
4Park, including renovations to
5historic memorials and Civil War-era
6display

 

7Project Allocation

750,000

8(Base Project Allocation - $750,000)

 

9(vi.1) Schuylkill Township

 

10(A) Construction and other related costs
11for renovations to municipal complex,
12including police indoor shooting
13range, installation of geothermal and
14solar and new outbuilding

 

15Project Allocation

1,250,000

16(Base Project Allocation - $1,250,000)

 

17(B) Construction, renovation, demolition,
18abatement of hazardous materials and
19other related costs for fire company
20apparatus

 

21Project Allocation

4,500,000

22(Base Project Allocation - $4,500,000)

 

23(vii) Upper Uwchlan Township

 

24(A) Construction, infrastructure and
25other related costs for roadway
26reconstruction, landscaping and
27streetscape improvements to
28Pennsylvania Drive and Stockton Drive,
29located within Hankin's Eagleview

 

30Project Allocation

700,000

1(Base Project Allocation - $700,000)

 

2(B) Construction and other related costs
3for renovations and rehabilitation of
4barn located in Upland Farms Park, to
5be utilized as local community center

 

6Project Allocation

910,000

7(Base Project Allocation - $910,000)

 

8(viii) Uwchlan Township

 

9(A) Construction, infrastructure and
10other related costs for improvement
11and expansion of Eagleview complex

 

12Project Allocation

10,000,000

13(Base Project Allocation -
14$10,000,000)

 

15(B) Construction, infrastructure and
16other related costs for improvement
17and expansion of Innovation Center at
18Eagleview

 

19Project Allocation

2,000,000

20(Base Project Allocation - $2,000,000)

 

21(ix) West Chester Borough

 

22(A) Acquisition, construction,
23infrastructure and other related costs
24for Borough of West Chester multiuse
25theater project

 

26Project Allocation

500,000

27(Base Project Allocation - $500,000)

 

28(B) Acquisition, construction,
29infrastructure and other related costs
30for West Chester Borough redevelopment

 

1projects

 

2Project Allocation

7,000,000

3(Base Project Allocation - $7,000,000)

 

4(C) Acquisition, construction,
5infrastructure and other related costs
6for former biopharma site
7redevelopment projects

 

8Project Allocation

2,500,000

9(Base Project Allocation - $2,500,000)

 

10(16) Clarion County

 

11(i) (Reserved)

 

<-12(ii) Monroe Township

 

13(A) Acquisition, infrastructure,
14construction and other related costs
15for assisted living senior community

 

16Project Allocation

1,000,000

17(Base Project Allocation - $1,000,000)

 

18(B) Acquisition, construction,
19infrastructure and other related costs
20for YMCA health and wellness center

 

21Project Allocation

3,000,000

22(Base Project Allocation - $3,000,000)

 

23(17) Clearfield County

 

24(i) County projects

 

25(A) Acquisition, infrastructure,
26construction and other related costs
27for economic project

 

28Project Allocation

10,000,000

29(Base Project Allocation -
30$10,000,000)

 

1(ii) Moshannon Valley Economic Development
2Partnership

 

3(A) Acquisition, infrastructure,
4construction and other related costs
5for medical building in medically
6underserved area

 

7Project Allocation

2,000,000

8(Base Project Allocation - $2,000,000)

 

9(iii) Bloom Township

<-

10(A) Construction, infrastructure and
11other related costs for the
12development of regional trans loading
13facility at Falls Creek location of
14Russell Stone Products

 

15Project Allocation

1,400,000

16(Base Project Allocation - $1,400,000)

 

17(iii) City of DuBois

<-

18(iv) City of DuBois

<-

19(A) Infrastructure, construction and
20other related costs for expansion of
21existing medical arts building at
22DuBois Regional Medical Center

 

23Project Allocation

7,500,000

24(Base Project Allocation - $7,500,000)

 

25(18) Clinton County

 

26(i) County projects

 

27(A) Acquisition, infrastructure,
28construction and other related costs
29for economic project

 

30Project Allocation

10,000,000

1(Base Project Allocation -
2$10,000,000)

 

<-3(B) Acquisition, construction, facility
4improvements, machinery and equipment
5costs related to renovation and
6expansion with Jersey Shore Steel

 

7Project Allocation

2,500,000

8(Base Project Allocation - $2,500,000)

 

<-9(ii) Lock Haven

 

10(A) Construction, infrastructure and
11other related costs for broadband
12fiber and wireless communications
13project

 

14Project Allocation

1,500,000

15(Base Project Allocation - $1,500,000)

 

16(B) Construction and other related costs
17for renovation of office building <-at 
18Lock Haven University

 

19Project Allocation

5,000,000

20(Base Project Allocation - $5,000,000)

 

21(ii) <-(iii) Wayne Township

 

22(A) Acquisition, construction and related
23infrastructure for a mulch recycling
24facility

 

25Project Allocation

750,000

26(Base Project Allocation - $750,000)

 

27(B) Demolition, construction and related
28infrastructure to relocate weight
29scale and to construct scale house and
30roadway related to overall project

 

1Project Allocation

1,000,000

2(Base Project Allocation - $1,000,000)

 

3(C) Construction and infrastructure for a
4new administration building that will
5include educational facilities

 

6Project Allocation

2,500,000

7(Base Project Allocation - $2,500,000)

 

8(D) Construction and related
9infrastructure for compressed natural
10gas filling station for solid waste
11authority vehicles and public filling

 

12Project Allocation

1,000,000

13(Base Project Allocation - $1,000,000)

 

14(E) Acquisition, construction and related
15infrastructure for a vehicle
16maintenance shop for service of
17compressed natural gas vehicles

 

18Project Allocation

750,000

19(Base Project Allocation - $750,000)

 

20(F) Construction and related
21infrastructure for facilities to
22collect and process landfill gas into
23compressed natural gas

 

24Project Allocation

1,500,000

25(Base Project Allocation - $1,500,000)

 

26(19) Columbia County

 

<-27(i) (Reserved)

 

<-28(i) County projects

 

29(A) Renovations and upgrades to Ber
30Vaughn Park swimming pool complex

 

1Project Allocation

2,750,000

2(Base Project Allocation - $2,750,000)

 

3(20) Crawford County

 

4(i) County projects

 

5(A) Acquisition, infrastructure, and
6construction of trail segments
7advancing Erie-to-Pittsburgh trail
8corridor and closing existing gaps

 

9Project Allocation

1,000,000

10(Base Project Allocation - $1,000,000)

 

11(B) Acquisition, infrastructure,
12construction and renovations of
13existing or needed infrastructure
14promoting economic development

 

15Project Allocation

2,000,000

16(Base Project Allocation - $2,000,000)

 

17(ii) Conneaut Valley Economic and Industrial
18Development Authority

 

19(A) Acquisition, rehabilitation,
20construction and other related costs,
21including abatement of hazardous
22materials, for regional economic
23development project in downtown
24Conneautville Borough

 

25Project Allocation

1,500,000

26(Base Project Allocation - $1,500,000)

 

27(iii) Economic Progress Alliance of Crawford
28County

 

29(A) Acquisition, infrastructure
30improvements, site planning,

 

1renovation, remediation, construction
2and other related costs for continued
3development of Linesville Business
4Park

 

5Project Allocation

1,000,000

6(Base Project Allocation - $1,000,000)

 

7(B) Acquisition, infrastructure
8improvements, site planning,
9renovation, remediation, construction
10and other related costs for continued
11development of Bessemer Street in City
12of Meadville

 

13Project Allocation

1,000,000

14(Base Project Allocation - $1,000,000)

 

15(C) Acquisition, infrastructure
16improvements, site planning,
17renovation, remediation, construction
18and other related costs for continued
19development of Crawford Woodlands in
20Vernon Township

 

21Project Allocation

2,000,000

22(Base Project Allocation - $2,000,000)

 

23(D) Acquisition, infrastructure,
24construction and other related costs
25for redevelopment and expansion of
26Meadville Medical Center

 

27Project Allocation

25,000,000

28(Base Project Allocation -
29$25,000,000)

 

30(iv) Redevelopment Authority of the City of

 

1Meadville

 

2(A) Acquisition, infrastructure,
3construction and other related costs
4for renovations and redevelopment of
5various land parcels and commercial
6properties located within City of
7Meadville

 

8Project Allocation

2,500,000

9(Base Project Allocation - $2,500,000)

 

10(B) Construction, infrastructure and
11other related costs for renovation of
12Bentley Hall at Allegheny College

 

13Project Allocation

10,000,000

14(Base Project Allocation -
15$10,000,000)

 

16(v) Titusville Redevelopment Authority

 

17(A) Infrastructure, construction and
18redevelopment of properties along
19Titusville portion of Erie-to-
20Pittsburgh trail

 

21Project Allocation

500,000

22(Base Project Allocation - $500,000)

 

23(B) Acquisition, rehabilitation,
24construction and other related costs,
25including abatement of hazardous
26materials, for redevelopment of
27blighted properties located within
28City of Titusville

 

29Project Allocation

1,000,000

30(Base Project Allocation - $1,000,000)

 

1(C) Infrastructure, renovation and
2redevelopment of several steel mill
3buildings for conversion into
4multitenant industrial building

 

5Project Allocation

1,500,000

6(Base Project Allocation - $1,500,000)

 

7(D) Infrastructure and other related
8costs for construction of five light
9manufacturing incubators, including
10new buildings, loading docks, rail
11spur and rail sidings

 

12Project Allocation

2,000,000

13(Base Project Allocation - $2,000,000)

 

<-14(vi) Conneaut Lake Borough

 

15(A) Construction, infrastructure,
16redevelopment and other related costs
17for revitalization of downtown
18business district

 

19Project Allocation

4,000,000

20(Base Project Allocation - $4,000,000)

 

21(21) Cumberland County

 

<-22(i) (Reserved)

 

<-23(i.1) (ii) Camp Hill Borough

 

24(A) Land acquisition, construction,
25infrastructure improvement, renovation
26and other related costs for expansion
27of Holy Spirit Health System
28facilities

 

29Project Allocation

5,000,000

30(Base Project Allocation - $5,000,000)

 

<-1(i.2) (iii) East Pennsboro Township

 

2(A) Land acquisition, infrastructure
3improvements, demolition, site
4improvement, renovation, addition,
5utility expansion, construction,
6purchase of medically necessary
7fixtures and other related costs for
8hospital and other related facilities
9of Holy Spirit Health System

 

10Project Allocation

3,500,000

11(Base Project Allocation - $3,500,000)

 

<-12(i.3) (iv) Hampden Township

 

13(A) Construction, acquisition,
14infrastructure, redevelopment and
15other related costs for PinnacleHealth
16West Shore Campus

 

17Project Allocation

10,000,000

18(Base Project Allocation -
19$10,000,000)

 

<-20(B) Acquisition, infrastructure,
21construction, redevelopment and other
22related costs for PinnacleHealth
23Community Campus

 

24Project Allocation

10,000,000

25(Base Project Allocation -
26$10,000,000)

 

<-27(i.4) (v) Hampden Township

 

28(A) Purchase, renovation and other
29related costs for community homes by
30Keystone Human Services to support

 

1persons with intellectual disabilities

 

2Project Allocation

3,740,000

3(Base Project Allocation - $3,740,000)

 

<-4(vi) Borough of Lemoyne

 

5(A) Construction, infrastructure and
6other related costs for new fire
7station

 

8Project Allocation

1,500,000

9(Base Project Allocation - $1,500,000)

 

10(i) <-(i.5) (vii) Borough of Shippensburg

 

11(A) Acquisition, infrastructure,
12construction and other costs related
13to Dykeman Road extension project
14located within industrial park

 

15Project Allocation

2,500,000

16(Base Project Allocation - $2,500,000)

 

17(B) Renovations, redevelopment and other
18related costs for design, construction
19and development of community center

 

20Project Allocation

1,000,000

21(Base Project Allocation - $1,000,000)

 

<-22(ii) (viii) Silver Spring Township

 

23(A) Land acquisition, infrastructure
24improvements, environmental
25remediation, construction and other
26related costs for community
27recreational facilities

 

28Project Allocation

3,000,000

29(Base Project Allocation - $3,000,000)

 

<-30(B) Purchase, renovation and other

 

1related costs for community homes by
2Keystone Human Services to support
3persons with intellectual disabilities

 

4Project Allocation

3,740,000

5(Base Project Allocation - $3,740,000)

 

6(iii) (ix)<- South Middleton Township

 

7(A) Construction and other related costs
8for new dining facility and
9improvements to existing buildings
10that are part of Diakon Wilderness
11Center

 

12Project Allocation

2,000,000

13(Base Project Allocation - $2,000,000)

 

<-14(x) Wormleysburg Borough

 

15(A) Construction, infrastructure and
16other costs related to the expansion
17of Early Childhood Center at
18Harrisburg Academy

 

19Project Allocation

2,000,000

20(Base Project Allocation - $2,000,000)

 

21(22) Dauphin County

 

22(i) County projects

 

23(A) Construction and other related costs
24for improvement of infrastructure in
25City of Harrisburg and other
26surrounding communities

 

27Project Allocation

24,000,000

28(Base Project Allocation -
29$24,000,000)

 

30(B) Acquisition, construction,

 

1infrastructure and other related costs
2for Union House Apartment adaptive
3reuse project

 

4Project Allocation

1,000,000

5(Base Project Allocation - $1,000,000)

 

6(C) Construction and infrastructure
7improvements for Jewish Federation of 
8Greater Harrisburg facility

 

9Project Allocation

1,100,000

10(Base Project Allocation - $1,100,000)

 

<-11(D) Acquisition, construction and related
12infrastructure for facility to provide
13training for multidisciplinary
14investigative teams and other
15individuals in area of child
16protective services

 

17Project Allocation

3,500,000

18(Base Project Allocation - $3,500,000)

 

<-19(E) Construction of firearm manufacturing
20facility to be located within ten
21miles of Harrisburg International
22Airport (HIA)

 

23Project Allocation

38,000,000

24(Base Project Allocation -
25$38,000,000)

 

26(ii) City of Harrisburg

 

27(A) Acquisition, construction,
28infrastructure and other related costs
29for Greenwood Business Center
30incubator project

 

1Project Allocation

1,500,000

2(Base Project Allocation - $1,500,000)

 

<-3(B) Construction, renovation,
4rehabilitation, redevelopment,
5infrastructure improvement and other
6related costs at Harrisburg Resource
7Recovery Facility

 

8Project Allocation

8,000,000

9(Base Project Allocation - $8,000,000)

 

10(C) Acquisition, construction,
11infrastructure, redevelopment,
12abatement of hazardous materials and
13other related costs for construction
14of art and athletic facility

 

15Project Allocation

2,000,000

16(Base Project Allocation - $2,000,000)

 

17(D) Acquisition, construction,
18infrastructure and other related costs
19for redevelopment projects

 

20Project Allocation

20,000,000

21(Base Project Allocation -
22$20,000,000)

 

23(E) Acquisition, construction and other
24related costs for PinnacleHealth
25campus improvements and expansion

 

26Project Allocation

10,000,000

27(Base Project Allocation -
28$10,000,000)

 

29(F) Acquisition, renovation,
30infrastructure and other related costs

 

1for site development and improvements,
2including structural improvements, for
3at-risk youth through renovation of
4Joshua Learning Center

 

5Project Allocation

1,000,000

6(Base Project Allocation - $1,000,000)

 

<-7(G) Acquisition, construction,
8infrastructure, redevelopment and
9other related costs for a Salvation
10Army Corps Community Center on Paxton
11Street

 

12Project Allocation

6,000,000

13(Base Project Allocation - $6,000,000)

 

14(iii) Derry Township

 

15(A) Acquisition, construction,
16infrastructure and other related costs
17for Vista Foundation Autism Spectrum
18Disorder project

 

19Project Allocation

350,000

20(Base Project Allocation - $350,000)

 

<-21(iii.1) East Hanover Township

 

22(A) Purchase, renovation and other
23related costs for community homes by
24Keystone Human Services to support
25persons with intellectual disabilities

 

26Project Allocation

3,740,000

27(Base Project Allocation - $3,740,000)

 

28(iv) Londonderry Township

 

29(A) Construction, infrastructure and
30other related costs for water service

 

1infrastructure for commercial and
2industrial projects

 

3Project Allocation

1,000,000

4(Base Project Allocation - $1,000,000)

 

<-5(iv.1) Lower Paxton Township

 

6(A) Construction, infrastructure and
7other related costs for recreation
8facility on Bishop McDevitt High
9School campus on Spring Creek Road

 

10Project Allocation

725,000

11(Base Project Allocation - $725,000)

 

12(B) Purchase, renovation and other
13related costs for community homes by
14Keystone Human Services to support
15persons with intellectual disabilities

 

16Project Allocation

3,740,000

17(Base Project Allocation - $3,740,000)

 

<-18(C) Acquisition, infrastructure,
19construction, redevelopment and other
20related costs for PinnacleHealth
21Community Campus

 

22Project Allocation

10,000,000

23(Base Project Allocation -
24$10,000,000)

 

25(iv.2) Middle Paxton Township

 

26(A) Construction, infrastructure,
27redevelopment and other related costs
28for renovation and expansion of YWCA's
29Camp Reily

 

30Project Allocation

3,000,000

1(Base Project Allocation - $3,000,000)

 

<-2(iv.3) South Hanover Township

 

3(A) Acquisition, construction,
4infrastructure and other related costs
5for municipal complex and emergency
6services facility

 

7Project Allocation

2,500,000<-

8(Base Project Allocation - $2,500,000)

 

9(v) Swatara Township

 

10(A) Acquisition, construction,
11infrastructure and other related costs
12for Swatara Gardens senior housing
13project

 

14Project Allocation

1,000,000

15(Base Project Allocation - $1,000,000)

 

<-16(v.1) Susquehanna Township

 

17(A) Purchase, renovation and other
18related costs for community homes by
19Keystone Human Services to support
20persons with intellectual disabilities

 

21Project Allocation

3,740,000

22(Base Project Allocation - $3,740,000)

 

23(23) Delaware County

 

24(i) County projects

 

25(A) Acquisition, infrastructure,
26construction and other related costs
27for commercial development of housing,
28retail and other mixed uses at Widener
29University

 

30Project Allocation

2,000,000

1(Base Project Allocation - $2,000,000)

 

2(B) Delaware County Housing Authority,
3acquisition, infrastructure,
4redevelopment, construction, abatement
5of hazardous materials and other
6related costs for development of
7properties in Ridley Township and
8Nether Providence Township

 

9Project Allocation

1,500,000

10(Base Project Allocation - $1,500,000)

 

<-11(C) Construction, renovations and other
12costs related to conversion and
13upgrade of all patient rooms to
14private rooms at Delaware County
15Memorial Hospital

 

16Project Allocation

4,000,000

17(Base Project Allocation - $4,000,000)

 

18(i.1) Chester Economic Development Authority

 

19(A) Construction, expansion,
20infrastructure improvements,
21environmental remediation,
22rehabilitation, renovation and other
23related costs for the completion of
24Phase II for sports and entertainment
25complex on Chester waterfront

 

26Project Allocation

15,000,000

27(Base Project Allocation -
28$15,000,000)

 

29(i.2) Delaware County Commerce Center

 

30(A) Acquisition, infrastructure,

 

1rehabilitation, construction and other
2related costs for entertainment, hotel
3and special events facility

 

4Project Allocation

12,500,000

5(Base Project Allocation -
6$12,500,000)

 

<-7(B) Construction, infrastructure,
8renovation and other related costs for
9alternative energy facility utilizing
10plasma technologies

 

11Project Allocation

3,000,000

12(Base Project Allocation - $3,000,000)

 

13(ii) Delaware County Industrial Development
14Authority

 

15(A) Infrastructure, construction and
16other related costs for revitalization
17of former Sears site

 

18Project Allocation

4,200,000

19(Base Project Allocation - $4,200,000)

 

20(B) Infrastructure, construction, public
21utility upgrades and other related
22costs for Chadds Ford redevelopment
23project

 

24Project Allocation

5,000,000

25(Base Project Allocation - $5,000,000)

 

26(C) Acquisition, site preparation,
27infrastructure and construction costs
28related to mixed-use redevelopment
29project to be located adjacent to
30Cardinal O'Hara High School

 

1Project Allocation

20,000,000

2(Base Project Allocation -
3$20,000,000)

 

<-4(D) Acquisition, site preparation,
5construction, infrastructure,
6abatement of hazardous materials and
7other related costs to support Pond's
8Edge redevelopment project in
9Middletown Township

 

10Project Allocation

5,000,000

11(Base Project Allocation - $5,000,000)

 

<-12(E) Construction, infrastructure and
13other related costs for the
14redevelopment of former Lyondell
15building in Newtown Township

 

16Project Allocation

5,798,000

17(Base Project Allocation - $5,798,000)

 

18(iii) Delaware County Redevelopment Authority

 

19(A) Site preparation, installation of
20public utilities and related
21facilities, construction and
22installation of sidewalks and fencing
23and other related costs for
24multipurpose athletic facility at
25Cardinal O'Hara High School

 

26Project Allocation

300,000

27(Base Project Allocation - $300,000)

 

28(B) Infrastructure, renovations,
29construction and other related costs
30for rehabilitation of former school

 

1building to accommodate day program
2services

 

3Project Allocation

500,000

4(Base Project Allocation - $500,000)

 

5(C) Acquisition, infrastructure,
6construction and other related costs
7for development of integrated
8ambulatory center for Mercy Health
9System to provide expanded access to
10primary care, specialty care and
11diagnostic services

 

12Project Allocation

1,750,000

13(Base Project Allocation - $1,750,000)

 

14(D) Infrastructure, construction,
15renovation and other related costs for
16expansion of Neumann University's
17Bruder Student Life Center

 

18Project Allocation

3,000,000

19(Base Project Allocation - $3,000,000)

 

20(E) Acquisition, design, infrastructure,
21construction, renovation and other
22related costs for construction of
23safety cross-over bridge project,
24connecting Neumann University's main
25campus to student center and residence
26housing

 

27Project Allocation

3,000,000

28(Base Project Allocation - $3,000,000)

 

29(F) Acquisition, infrastructure,
30construction and other related costs

 

1for rehabilitation and renovation of
2the historic Deshong Museum and
3mansion

 

4Project Allocation

5,000,000

5(Base Project Allocation - $5,000,000)

 

6(G) Acquisition, design, infrastructure,
7construction and other related costs
8for access ramp, within Crozer-Chester
9Medical Center, to allow for ingress
10and regress

 

11Project Allocation

10,000,000

12(Base Project Allocation -
13$10,000,000)

 

14(H) Acquisition, infrastructure,
15redevelopment, construction, abatement
16of hazardous materials and other
17related costs for redevelopment of
18properties in Penn Hills area of
19Ridley Township

 

20Project Allocation

2,500,000

21(Base Project Allocation - $2,500,000)

 

22(I) Land acquisition, infrastructure
23improvements, demolition, site
24improvement, renovation, addition,
25utility expansion and other related
26costs for hospital and related
27facilities of main line health system

 

28Project Allocation

10,000,000

29(Base Project Allocation -
30$10,000,000)

 

<-1(J) Redevelopment, construction,
2demolition, infrastructure and other
3related costs for commercial and
4retail development of Upper Darby 69th
5Street corridor

 

6Project Allocation

7,500,000

7(Base Project Allocation - $7,500,000)

 

8(K) Redevelopment, construction,
9infrastructure and other related costs
10for commercial development of Primos
11Film and Video Studios

 

12Project Allocation

1,000,000

13(Base Project Allocation - $1,000,000)

 

<-14(L) Construction, infrastructure and
15other related costs for new on-campus
16student housing, limited university-
17operated and student-centric retail,
18performing arts center, pedestrian
19bridge over Route 30 and parking
20improvements, including a 1,230-care
21parking structure for Villanova
22University in Radnor Township

 

23Project Allocation

10,000,000

24(Base Project Allocation -
25$10,000,000)

 

26(M) Construction, acquisition, railroad
27infrastructure, including support
28facilities, and related costs for
29economic development project

 

30Project Allocation

10,000,000

1(Base Project Allocation -
2$10,000,000)

 

3(iv) City of Chester

 

4(A) Acquisition, infrastructure,
5construction and other related costs
6for renovation and rehabilitation of
7historic 1724 Old Chester Courthouse
8and courtyard

 

9Project Allocation

3,000,000

10(Base Project Allocation - $3,000,000)

 

<-11(B) Acquisition, construction,
12infrastructure, redevelopment and
13other related costs for mixed-use
14redevelopment in downtown central
15business district and surrounding
16neighborhoods

 

17Project Allocation

10,000,000

18(Base Project Allocation -
19$10,000,000)

 

20(C) Acquisition, construction,
21infrastructure, redevelopment and
22other related costs for parking
23projects in downtown central business
24area and surrounding areas

 

25Project Allocation

15,000,000

26(Base Project Allocation -
27$15,000,000)

 

28(D) Acquisition, construction,
29infrastructure, redevelopment and
30other related costs for waterfront

 

1redevelopment

 

2Project Allocation

15,000,000

3(Base Project Allocation -
4$15,000,000)

 

5(E) Acquisition, construction,
6infrastructure, redevelopment and
7other related costs for redevelopment
8of downtown central business district
9and surrounding neighborhoods

 

10Project Allocation

20,000,000

11(Base Project Allocation -
12$20,000,000)

 

13(F) Acquisition, construction,
14infrastructure, redevelopment and
15other related costs for redevelopment
16projects

 

17Project Allocation

10,000,000

18(Base Project Allocation -
19$10,000,000)

 

<-20(iv.1) Chester Township

 

21(A) Construction and other related costs
22for fire station

 

23Project Allocation

1,000,000

24(Base Project Allocation - $1,000,000)

 

25(v) Borough of Eddystone

 

26(A) Acquisition, infrastructure,
27construction and other related costs
28for renovation and rehabilitation of
29Eddystone Fire House and Evacuation
30Center

 

1Project Allocation

1,000,000

2(Base Project Allocation - $1,000,000)

 

<-3(vi) Glenolden Borough

 

4(A) Acquisition, construction and other
5related costs for recreational fields,
6maintenance facility and walking
7trails

 

8Project Allocation

500,000

9(Base Project Allocation - $500,000)

 

<-10(vi.1) Haverford Township

 

11(A) Construction, redevelopment,
12infrastructure and other related costs
13for a municipal services building

 

14Project Allocation

9,000,000

15(Base Project Allocation - $9,000,000)

 

16(B) Construction, redevelopment,
17infrastructure and other related costs
18for a combined police, EMS, township
19administration and other municipal
20services facility

 

21Project Allocation

3,000,000

22(Base Project Allocation - $3,000,000)

 

23(vii) Marple Township

 

24(A) Construction, infrastructure and
25other related costs for new Municipal
26Police Station and Magisterial
27District Court

 

28Project Allocation

4,100,000

29(Base Project Allocation - $4,100,000)

 

30(B) Construction, infrastructure,

 

1rehabilitation, renovation and other
2related costs for Marple Township
3Municipal and Library Building

 

4Project Allocation

654,000

5(Base Project Allocation - $654,000)

 

6(C) Site preparation, infrastructure,
7construction and other related costs
8to support the development of new
9facility for Broomall Fire Company

 

10Project Allocation

3,250,000

11(Base Project Allocation - $3,250,000)

 

12(viii) Borough of Media

 

13(A) Construction, infrastructure,
14renovation, redevelopment and other
15related costs for Media-Upper
16Providence Free Library

 

17Project Allocation

750,000

18(Base Project Allocation - $750,000)

 

19(viii.1) Millbourne Borough

 

20(A) Construction, infrastructure and
21other related costs for redevelopment
22of former Sears site

 

23Project Allocation

4,200,000

24(Base Project Allocation - $4,200,000)

 

25(ix) Morton Borough

 

26(A) Construction, renovation and other
27related costs for improvements to
28municipal building, including police
29station, borough offices and community
30facilities

 

1Project Allocation

500,000

2(Base Project Allocation - $500,000)

 

3(x) Newtown Township

 

4(A) Acquisition, construction,
5infrastructure, redevelopment and
6other related costs for municipal and
7public safety facility

 

8Project Allocation

5,000,000

9(Base Project Allocation - $5,000,000)

 

10(xi) Norwood Borough

 

11(A) Construction and other related costs
12for new firehouse

 

13Project Allocation

500,000

14(Base Project Allocation - $500,000)

 

15(xii) Prospect Park Borough

 

16(A) Construction, redevelopment,
17rehabilitation and other related costs
18to revitalize a blighted
19business/civic district

 

20Project Allocation

800,000

21(Base Project Allocation - $800,000)

 

22(vi) <-(xiii) Radnor Township

 

23(A) Construction, renovation and
24rehabilitation of capital facilities,
25including infrastructure on campus of
26Cabrini College

 

27Project Allocation

10,000,000

28(Base Project Allocation -
29$10,000,000)

 

<-30(B) Construction, redevelopment and other

 

1related costs for projects relating to
2Creutzberg Center

 

3Project Allocation

1,050,000

4(Base Project Allocation - $1,050,000)

 

5(C) Construction, infrastructure and
6other related costs for projects in
7Fenimore Woods Park

 

8Project Allocation

700,000

9(Base Project Allocation - $700,000)

 

10(D) Construction, infrastructure,
11redevelopment and other related costs
12for projects relating to Radnor
13Township Building

 

14Project Allocation

500,000

15(Base Project Allocation - $500,000)

 

16(E) Upgrades and deferred maintenance,
17Phase VII, for north Wayne flood
18mitigation

 

19Project Allocation

550,000

20(Base Project Allocation - $550,000)

 

<-21(xiii.1) Ridley Park Borough

 

22(A) Infrastructure improvements,
23construction, relocation, renovation
24and other related costs for Taylor
25Hospital

 

26Project Allocation

4,000,000

27(Base Project Allocation - $4,000,000)

 

28(xiv) Sharon Hill Borough

 

29(A) Renovations, construction, energy
30efficiency upgrades and other related

 

1costs for Sharon Hill Borough fire
2department

 

3Project Allocation

500,000

4(Base Project Allocation - $500,000)

 

5(xv) Springfield Township

 

6(A) Rehabilitation, renovation,
7infrastructure and other related costs
8for improvements to two business
9districts

 

10Project Allocation

1,000,000

11(Base Project Allocation - $1,000,000)

 

12(B) Renovations and other related costs
13for ADA accessibility requirements and
14upgrade facilities used for township
15public safety and emergency operation
16activities

 

17Project Allocation

500,000

18(Base Project Allocation - $500,000)

 

19(C) Renovation, infrastructure and other
20related costs for township parks and
21recreation projects

 

22Project Allocation

1,000,000

23(Base Project Allocation - $1,000,000)

 

24(D) Construction, infrastructure and
25other related costs for development of
26full-service hotel facility

 

27Project Allocation

3,000,000

28(Base Project Allocation - $3,000,000)

 

29(E) Renovation, infrastructure and other
30related costs for township

 

1building/police station

 

2Project Allocation

2,500,000

3(Base Project Allocation - $2,500,000)

 

4(xvi) Tinicum Township

 

5(A) Construction, redevelopment,
6rehabilitation and other related costs
7for renovation of Lazaretto Quarantine
8Station for reuse as Tinicum Township
9Municipal Building

 

10Project Allocation

3,000,000

11(Base Project Allocation - $3,000,000)

 

<-12(xvii) Upland Borough

 

13(A) Upgrade central heat and cooling
14systems for Crozer-Keystone Health
15System, including construction,
16infrastructure and other related costs

 

17Project Allocation

8,000,000

18(Base Project Allocation - $8,000,000)

 

19(xvii)<- (xviii) Upper Providence Township

 

20(A) Construction, infrastructure and
21other related costs for new
22gymnasium/multipurpose building at
23Walden School and related site
24improvements

 

25Project Allocation

1,200,000

26(Base Project Allocation - $1,200,000)

 

27(24) Elk County

 

28(i) County projects

 

29(A) Acquisition, infrastructure,
30construction and other related costs

 

1for economic project

 

2Project Allocation

10,000,000

3(Base Project Allocation -
4$10,000,000)

 

5(ii) Elk County Redevelopment Authority

 

6(A) Acquisition, renovation,
7environmental remediation,
8construction and other related costs
9for rehabilitation of commercial
10buildings in Historic District of
11Ridgway Borough

 

12Project Allocation

4,000,000

13(Base Project Allocation - $4,000,000)

 

14(25) Erie County

 

15(i) County Projects

 

16(A) Acquisition, construction,
17infrastructure improvements and other
18costs related to the L2S-NMI-ERIE
19Medical Device Assembly Plant project

 

20Project Allocation

250,000

21(Base Project Allocation - $250,000)

 

<-22(B) Acquisition, construction,
23infrastructure, redevelopment and
24other related costs for Erie
25Metropolitan Transit Authority
26projects

 

27Project Allocation

2,500,000

28(Base Project Allocation - $2,500,000)

 

29(C) Acquisition, construction,
30infrastructure, redevelopment and

 

1other related costs for CNG fueling
2station projects of Erie Metropolitan
3Transit Authority

 

4Project Allocation

2,500,000

5(Base Project Allocation - $2,500,000)

 

6(ii) Boroughs of Albion and Crainesville;
7Conneaut and Elk Creek

 

8(A) Construct rail improvements and
9replace rail bridge at Erie Inland
10Port-Albion site

 

11Project Allocation

12,000,000

12(Base Project Allocation -
13$12,000,000)

 

14(iii) Corry Area Industrial Development
15Corporation

 

16(A) Acquisition, redevelopment and
17rehabilitation of vacant industrial
18facility to be converted to
19multitenant manufacturing facilities

 

20Project Allocation

2,500,000

21(Base Project Allocation - $2,500,000)

 

22(iv) Economic Development Corporation of Erie
23County

 

24(A) Infrastructure, construction,
25redevelopment and other related costs
26for improvement of former potato chip
27factory

 

28Project Allocation

1,000,000

29(Base Project Allocation - $1,000,000)

 

30(v) Erie City

 

1(A) Construction, infrastructure and
2other related costs for Stairways
3Behavioral Health neighborhood
4revitalization project

 

5Project Allocation

5,100,000

6(Base Project Allocation - $5,100,000)

 

7(B) Construct rail improvements and ship
8loading infrastructure at Port of Erie

 

9Project Allocation

9,000,000

10(Base Project Allocation - $9,000,000)

 

<-11(C) Construction, infrastructure and
12other related costs for building joint
13operations facility

 

14Project Allocation

3,000,000

15(Base Project Allocation - $3,000,000)

 

<-16(D) Construction, infrastructure and
17other related costs for a new academic
18building at Mercyhurst University

 

19Project Allocation

7,000,000

20(Base Project Allocation - $7,000,000)

 

21(v.1) Conneaut Township

 

22(A) Acquisition, construction and other
23related costs for development of
24multitenant industrial site as part of
25regional initiative called Erie Inland
26Port

 

27Project Allocation

8,075,000

28(Base Project Allocation - $8,075,000)

 

29(26) Fayette County

 

30(i) Bullskin Township

 

1(A) Construction, infrastructure and
2other costs related to Fay/West Soccer
3Complex indoor facility project

 

4Project Allocation

2,500,000

5(Base Project Allocation - $2,500,000)

 

6(ii) City of Uniontown

 

7(A) Acquisition, infrastructure,
8construction and other related costs
9for development of White Swan
10Apartments

 

11Project Allocation

750,000

12(Base Project Allocation - $750,000)

 

13(iii) Connellsville City

 

14(A) Construction, redevelopment,
15infrastructure and other related costs
16for the renovation of Behavioral
17Health Unit of Highlands Hospital

 

18Project Allocation

1,150,000

19(Base Project Allocation - $1,150,000)

 

20(27) Forest County

 

21(i) (Reserved)

 

22(28) Franklin County

 

23(i) Franklin County Redevelopment Authority

 

24(A) Acquisition, construction,
25infrastructure and other related costs
26for economic development project in
27the county

 

28Project Allocation

2,000,000

29(Base Project Allocation - $2,000,000)

 

30(B) Infrastructure, construction and

 

1other related costs for renovation and
2rehabilitation of John Steward
3Memorial Library on Wilson College
4campus

 

5Project Allocation

5,000,000

6(Base Project Allocation - $5,000,000)

 

7(C) Acquisition, infrastructure,
8construction and other related costs
9for redevelopment of former Scotland
10School for Veterans' Children campus,
11including construction of educational
12and other use facilities

 

13Project Allocation

7,500,000

14(Base Project Allocation - $7,500,000)

 

15(D) Acquisition, infrastructure,
16construction and other costs related
17to renovations and improvements at
18hospital facilities and entities in
19the county

 

20Project Allocation

15,000,000

21(Base Project Allocation -
22$15,000,000)

 

23(E) Infrastructure, construction,
24abatement of hazardous materials and
25other related costs for renovation of
26Prentis Hall on Wilson College Campus

 

27Project Allocation

10,000,000

28(Base Project Allocation -
29$10,000,000)

 

<-30(i.1) Franklin County Industrial Development

 

1Authority

 

2(A) Construction, acquisition, site
3preparation, infrastructure and
4related development costs for a high-
5tech industry office park and related
6uses in Letterkenny Township

 

7Project Allocation

7,000,000

8(Base Project Allocation - $7,000,000)

 

9(ii) Chambersburg Borough

 

10(A) Acquisition, infrastructure, design,
11engineering, renovations,
12rehabilitation, construction, utility
13relocation, traffic improvements,
14traffic signal upgrades and other
15related costs for upgrading municipal
16electric systems throughout this
17Commonwealth

 

18Project Allocation

7,000,000

19(Base Project Allocation - $7,000,000)

 

20(B) Acquisition, infrastructure, design,
21engineering, renovations,
22rehabilitation, construction, utility
23relocation, traffic improvements,
24traffic signal upgrades and other
25related costs for creating distributed
26natural gas generation facilities at
27municipal electric systems throughout
28this Commonwealth

 

29Project Allocation

7,000,000

30(Base Project Allocation - $7,000,000)

 

<-1(C) Purchase, renovation and other
2related costs for community homes by
3Keystone Human Services to support
4persons with intellectual disabilities

 

5Project Allocation

3,740,000

6(Base Project Allocation - $3,740,000)

 

7(iii) Borough of Shippensburg

 

8(A) Construction, rehabilitation and
9other related costs for improvements
10to Memorial Park Stadium

 

11Project Allocation

2,500,000

12(Base Project Allocation - $2,500,000)

 

13(iv) Borough of Waynesboro

 

14(A) Acquisition, construction,
15infrastructure and other related costs
16for economic development project in
17Borough of Waynesboro

 

18Project Allocation

2,000,000

19(Base Project Allocation - $2,000,000)

 

20(29) Fulton County

 

21(i) (Reserved)<-

 

<-22(i) County projects

 

23(A) Acquisition, construction,
24infrastructure and other related costs
25for rehabilitation of 8.5 miles of
26abandoned Pennsylvania Turnpike as a
27multiuse trail

 

28Project Allocation

4,000,000

29(Base Project Allocation - $4,000,000)

 

30(30) Greene County

 

1(i) Franklin Township

 

2(A) Acquisition, construction,
3infrastructure and other related costs
4for Greene County Airport commercial
5development project

 

6Project Allocation

2,500,000

7(Base Project Allocation - $2,500,000)

 

8(B) Acquisition, construction,
9infrastructure and other related costs
10for Waynesburg Crossings economic
11development project

 

12Project Allocation

2,000,000

13(Base Project Allocation - $2,000,000)

 

14(C) Acquisition, construction,
15infrastructure and other related costs
16for Franklin Township Business Park
17project

 

18Project Allocation

5,000,000

19(Base Project Allocation - $5,000,000)

 

<-20(D) Acquisition, construction, facility
21improvements, machinery and equipment
22costs related to renovation of Kyowa
23facility

 

24Project Allocation

2,000,000

25(Base Project Allocation - $2,000,000)

 

<-26(ii) Waynesburg Borough

 

27(A) Acquisition, construction,
28infrastructure, redevelopment and
29other related costs for academic
30building at Waynesburg University

 

1Project Allocation

7,000,000

2(Base Project Allocation - $7,000,000)

 

3(B) Acquisition, construction,
4infrastructure, redevelopment and
5other related costs for dormitory at
6Waynesburg University

 

7Project Allocation

3,500,000

8(Base Project Allocation - $3,500,000)

 

9(31) Huntingdon County

 

10(i) County projects

 

11(A) Acquisition, construction,
12infrastructure and other related costs
13for a Federally Qualified Health
14Center-anchored multiservice facility

 

15Project Allocation

3,000,000

16(Base Project Allocation - $3,000,000)

 

17(ii) Huntingdon County Business and Industry
18Incorporated

 

19(A) Acquisition, renovation, expansion
20and other improvements to Huntingdon
21County Career and Technology Center

 

22Project Allocation

2,500,000

23(Base Project Allocation - $2,500,000)

 

24(32) Indiana County

 

25(i) County projects

 

26(A) Acquisition, engineering, site
27preparation, infrastructure,
28construction and other related costs
29for development of vacant lots at
30Corporate Campus business park

 

1Project Allocation

1,000,000

2(Base Project Allocation - $1,000,000)

 

3(B) Acquisition, engineering, site
4preparation, infrastructure,
5construction and other related costs
6for development of multitenant
7building at Windy Ridge Business and
8Technology Park

 

9Project Allocation

1,000,000

10(Base Project Allocation - $1,000,000)

 

11(C) Acquisition, engineering, site
12preparation, infrastructure,
13construction and other related costs
14for development of industrial
15multitenant building known as
16Dixonville Commons

 

17Project Allocation

2,000,000

18(Base Project Allocation - $2,000,000)

 

19(D) Acquisition, engineering, site
20preparation, infrastructure,
21construction and other related costs
22for rehabilitation of Indiana
23Community Center Building

 

24Project Allocation

2,000,000

25(Base Project Allocation - $2,000,000)

 

26(E) Acquisition, engineering,
27infrastructure, construction and other
28related costs for development of
29countywide fiber optic network

 

30Project Allocation

2,000,000

1(Base Project Allocation - $2,000,000)

 

2(F) Acquisition, engineering, site
3preparation, infrastructure,
4construction and other related costs
5for development of multitenant
6building at 119 Business Park and
7Joseph Land development project

 

8Project Allocation

3,000,000

9(Base Project Allocation - $3,000,000)

 

10(G) Acquisition, engineering, site
11preparation, infrastructure,
12construction and other related costs
13for development of multipurpose
14building in White Township

 

15Project Allocation

3,000,000

16(Base Project Allocation - $3,000,000)

 

17(H) Acquisition, engineering, site
18preparation, infrastructure,
19construction and other related costs,
20including abatement of hazardous
21materials, for redevelopment of
22industrial building and conversion to
23multitenant building

 

24Project Allocation

3,000,000

25(Base Project Allocation - $3,000,000)

 

26(I) Acquisition, engineering, site
27preparation, infrastructure,
28construction and other related costs
29for development of vacant lots and
30acquisition of adjacent property at

 

1Windy Ridge Business and Technology
2Park

 

3Project Allocation

3,000,000

4(Base Project Allocation - $3,000,000)

 

5(J) Acquisition, engineering, site
6preparation, infrastructure,
7construction and other related costs
8for development of high bay,
9multitenant, industrial building at
10Windy Ridge Business and Technology
11Park

 

12Project Allocation

4,000,000

13(Base Project Allocation - $4,000,000)

 

14(K) Renovation, construction and other
15related costs for redevelopment of
16historic Rochester and Pittsburgh Coal
17Company building and conversion into a
18boutique hotel

 

19Project Allocation

4,000,000

20(Base Project Allocation - $4,000,000)

 

<-21(ii) Clymer Borough

 

22(A) Acquisition, infrastructure,
23redevelopment and other related costs
24to develop borough-owned property for
25senior residential development,
26ballfields, trails, veterans monument,
27green space and additional parking

 

28Project Allocation

1,650,000

29(Base Project Allocation - $1,650,000)

 

30(iii) Green Township

 

1(A) Construction, excavation,
2infrastructure and other related costs
3for new rail siding and transloading
4facility

 

5Project Allocation

1,500,000

6(Base Project Allocation - $1,500,000)

 

7(33) Jefferson County

 

8(i) County projects

 

9(A) Acquisition, infrastructure,
10construction and other related costs
11for economic project

 

12Project Allocation

10,000,000

13(Base Project Allocation -
14$10,000,000)

 

<-15(B) Development, construction,
16maintenance and other related costs
17for a hotel in Jefferson County

 

18Project Allocation

2,500,000

19(Base Project Allocation - $2,500,000)

 

20(ii) Brockway Borough

 

21(A) Acquisition, infrastructure,
22construction and other related costs
23for economic project to be located at
24intersection of Routes 219 and 28

 

25Project Allocation

10,000,000

26(Base Project Allocation -
27$10,000,000)

 

28(B) Acquisition, infrastructure,
29redevelopment, renovations and other
30related costs for educational and

 

1training facility

 

2Project Allocation

10,000,000

3(Base Project Allocation -
4$10,000,000)

 

5(iii) Eldred Township

 

6(A) Acquisition, infrastructure,
7construction and other related costs
8for economic development project in
9the county

 

10Project Allocation

1,000,000

11(Base Project Allocation - $1,000,000)

 

12(34) Juniata County

 

13(i) (Reserved)

 

14(35) Lackawanna County

 

15(i) County projects

 

16(A) Acquisition, construction,
17infrastructure and other related costs
18for Valley View Business Park
19Industrial Facility

 

20Project Allocation

5,000,000

21(Base Project Allocation - $5,000,000)

 

22(B) Acquisition, construction,
23renovations, infrastructure and other
24related costs for dental, medical,
25health sciences and patient care
26facilities project

 

27Project Allocation

20,000,000

28(Base Project Allocation -
29$20,000,000)

 

30(C) Acquisition, construction,

 

1renovations, infrastructure and other
2related costs for dental, medical,
3health sciences and patient care
4clinic

 

5Project Allocation

2,000,000

6(Base Project Allocation - $2,000,000)

 

7(ii) Archbald Borough

 

8(A) Construction, infrastructure and
9other costs related to Valley View
10Business Park redevelopment project

 

11Project Allocation

1,000,000

12(Base Project Allocation - $1,000,000)

 

13(B) Construction, infrastructure and
14other costs related for Archbald
15Business Park III redevelopment
16project

 

17Project Allocation

1,500,000

18(Base Project Allocation - $1,500,000)

 

19(C) Construction, infrastructure and
20other costs related to Valley View
21Business Park new building project

 

22Project Allocation

2,000,000

23(Base Project Allocation - $2,000,000)

 

24(D) Construction, infrastructure and
25other costs related to Archbald Route
266 Industrial Facility redevelopment
27project

 

28Project Allocation

2,000,000

29(Base Project Allocation - $2,000,000)

 

<-30(E) Acquisition, construction,

 

1infrastructure, redevelopment,
2abatement of hazardous materials and
3other related costs for economic
4development project along Peggy Drive
5in Archbald Township

 

6Project Allocation

1,000,000

7(Base Project Allocation - $1,000,000)

 

8(F) Construction, infrastructure and
9other related costs for Tinklepaugh
10Creek flood mitigation projects in
11Archbald and Blakely Boroughs

 

12Project Allocation

2,500,000

13(Base Project Allocation - $2,500,000)

 

14(ii.1) Archbald, Jessup and Blakely Boroughs

 

15(A) Acquisition, construction,
16infrastructure, redevelopment,
17abatement of hazardous materials and
18other related costs for Valley
19Community Civic Center project

 

20Project Allocation

2,500,000

21(Base Project Allocation - $2,500,000)

 

22(iii) Blakely Borough

 

23(A) Construction, infrastructure and
24other costs related to Blakely Borough
25Main Street Business District
26revitalization project

 

27Project Allocation

3,500,000

28(Base Project Allocation - $3,500,000)

 

29(iv) Carbondale Township

 

30(A) Construction, infrastructure and

 

1other costs related to Carbondale
2Technology Transfer Complex
3multitenant flex building project

 

4Project Allocation

361,000

5(Base Project Allocation - $361,000)

 

6(v) City of Carbondale

 

7(A) Acquisition, construction,
8infrastructure and other related costs
9for Carbondale Anchor Building
10redevelopment project

 

11Project Allocation

5,000,000

12(Base Project Allocation - $5,000,000)

 

13(vi) City of Scranton

 

14(A) Acquisition, construction,
15infrastructure and other related costs
16for Radisson Lackawanna Station
17restoration project

 

18Project Allocation

4,000,000

19(Base Project Allocation - $4,000,000)

 

20(B) Acquisition, construction,
21infrastructure and other related costs
22for Scranton Department of Public
23Works complex project

 

24Project Allocation

3,000,000

25(Base Project Allocation - $3,000,000)

 

26(C) Acquisition, construction,
27infrastructure and other related costs
28for Central Business District
29improvement project

 

30Project Allocation

2,000,000

1(Base Project Allocation - $2,000,000)

 

2(D) Acquisition, construction,
3infrastructure and other related costs
4for South Scranton Area Elm Street
5revitalization project

 

6Project Allocation

2,500,000

7(Base Project Allocation - $2,500,000)

 

8(E) Acquisition, construction,
9infrastructure and other related costs
10for Central Business District
11revitalization project

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

14(F) Acquisition, construction,
15infrastructure and other related costs
16for Neighborhood Commercial District
17revitalization project

 

18Project Allocation

4,000,000

19(Base Project Allocation - $4,000,000)

 

20(G) Acquisition, construction,
21infrastructure and other related costs
22for new downtown office building

 

23Project Allocation

5,000,000

24(Base Project Allocation - $5,000,000)

 

25(H) Acquisition, construction,
26infrastructure and other related costs
27for Iron Arts District redevelopment
28project

 

29Project Allocation

5,000,000

30(Base Project Allocation - $5,000,000)

 

1(I) Acquisition, construction,
2infrastructure and other related costs
3for Iron Furnaces historic site
4project

 

5Project Allocation

10,000,000

6(Base Project Allocation -
7$10,000,000)

 

8(J) Acquisition, construction,
9infrastructure and other related costs
10for renovation of buildings in
11Downtown Business District for
12Lackawanna County Efficiency in
13Government project

 

14Project Allocation

3,000,000

15(Base Project Allocation - $3,000,000)

 

16(K) Construction, infrastructure and
17other costs related to Lackawanna
18County Park redevelopment and
19improvement projects

 

20Project Allocation

500,000

21(Base Project Allocation - $500,000)

 

22(L) Construction, infrastructure and
23other costs related to Lackawanna
24County Economic Development Initiative

 

25Project Allocation

2,500,000

26(Base Project Allocation - $2,500,000)

 

27(M) Acquisition, construction,
28infrastructure and other related costs
29for Lackawanna College Continuing
30Education expansion project

 

1Project Allocation

1,750,000

2(Base Project Allocation - $1,750,000)

 

3(N) Acquisition, construction,
4infrastructure and other related costs
5for Lackawanna College Learning
6Commons project

 

7Project Allocation

4,500,000

8(Base Project Allocation - $4,500,000)

 

9(O) Construction, infrastructure and
10other costs related to Lackawanna
11College street redevelopment project

 

12Project Allocation

1,500,000

13(Base Project Allocation - $1,500,000)

 

14(P) Construction, infrastructure and
15other costs related to Commonwealth
16Medical College redevelopment project

 

17Project Allocation

500,000

18(Base Project Allocation - $500,000)

 

19(Q) Construction, infrastructure,
20demolition and other costs related to
21Scranton Enterprise Center renovation
22project

 

23Project Allocation

1,000,000

24(Base Project Allocation - $1,000,000)

 

25(R) Construction, infrastructure and
26other costs related to former Murray
27Corporation Building redevelopment
28project

 

29Project Allocation

4,000,000

30(Base Project Allocation - $4,000,000)

 

1(S) Acquisition, construction,
2renovation, infrastructure and other
3related costs for Mt. Pleasant
4Corporate Center Office Building
5redevelopment project

 

6Project Allocation

3,000,000

7(Base Project Allocation - $3,000,000)

 

8(T) Construction and other related costs
9to rebuild facilities at Scranton's
10Farmer's Market and Albright Avenue

 

11Project Allocation

1,500,000

12(Base Project Allocation - $1,500,000)

 

13(U) Construction, infrastructure and
14other costs related to University of
15Scranton South Side Sports Complex
16project

 

17Project Allocation

7,500,000

18(Base Project Allocation - $7,500,000)

 

19(V) Construction, infrastructure and
20other costs related to University of
21Scranton rehabilitation project

 

22Project Allocation

20,000,000

23(Base Project Allocation -
24$20,000,000)

 

25(W) Construction, infrastructure and
26other costs related to expansion of
27Sette La Verghetta Center for the
28Performing Arts at Marywood University

 

29Project Allocation

3,000,000

30(Base Project Allocation - $3,000,000)

 

1(X) Construction, infrastructure and
2other costs related to clinical and
3community services at Marywood
4University's South Campus renovation
5project

 

6Project Allocation

3,000,000

7(Base Project Allocation - $3,000,000)

 

8(Y) Construction, infrastructure and
9other costs related to The Knowledge
10(Learning) Commons at Marywood
11University redevelopment project

 

12Project Allocation

12,500,000

13(Base Project Allocation -
14$12,500,000)

 

15(Z) Acquisition, construction,
16infrastructure and other costs related
17to Wright Primary Care Center
18development project

 

19Project Allocation

2,500,000

20(Base Project Allocation - $2,500,000)

 

21(AA) Acquisition, construction,
22infrastructure and other costs related
23to redevelopment of Lackawanna Avenue

 

24Project Allocation

10,000,000

25(Base Project Allocation -
26$10,000,000)

 

27(BB) Acquisition, construction,
28infrastructure and other costs related
29to compressed natural gas fueling
30station and maintenance facility

 

1Project Allocation

6,000,000

2(Base Project Allocation - $6,000,000)

 

3(CC) Acquisition, construction,
4infrastructure and other costs related
5to intermodal transportation center

 

6Project Allocation

1,000,000

7(Base Project Allocation - $1,000,000)

 

8(DD) Acquisition, construction,
9infrastructure and other costs related
10to Timmy's Town Center Children's
11Museum project

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

14(EE) Acquisition, renovations,
15construction, infrastructure and other
16related costs for dental, medical,
17health sciences and patient care
18clinic

 

19Project Allocation

2,000,000

20(Base Project Allocation - $2,000,000)

 

21(vi.1) Covington Township

 

22(A) Construction, infrastructure
23improvements and other costs for the
24Moffat Estate redevelopment project

 

25Project Allocation

500,000

26(Base Project Allocation - $500,000)

 

27(vii) Dickson City

 

28(A) Acquisition, construction,
29infrastructure and other costs related
30to Dickson City Senior/Civic Center

 

1expansion project

 

2Project Allocation

2,500,000

3(Base Project Allocation - $2,500,000)

 

4(viii) Jefferson Township

 

5(A) Construction, infrastructure and
6other costs related to development of
7commercial site and to provide
8sanitary sewer infrastructure for
9project

 

10Project Allocation

1,000,000

11(Base Project Allocation - $1,000,000)

 

12(ix) Jessup Borough

 

13(A) Construction, infrastructure and
14other costs related to new building at
15Jessup Small Business Center

 

16Project Allocation

1,500,000

17(Base Project Allocation - $1,500,000)

 

18(B) Acquisition, construction,
19infrastructure and other costs related
20to Valley View Business Park
21Interchange project

 

22Project Allocation

8,000,000

23(Base Project Allocation - $8,000,000)

 

24(x) Laplume Township

 

25(A) Construction, infrastructure and
26other costs related to recreational
27facilities and housing projects for
28Keystone College

 

29Project Allocation

3,500,000

30(Base Project Allocation - $3,500,000)

 

1(xi) Mayfield Borough

 

2(A) Acquisition, construction,
3infrastructure and other costs related
4to Lackawanna Business Center
5redevelopment project

 

6Project Allocation

3,000,000

7(Base Project Allocation - $3,000,000)

 

8(xii) Moosic Borough

 

9(A) Construction, infrastructure
10improvements, and other costs related
11to former JC Penney building expansion
12project

 

13Project Allocation

2,000,000

14(Base Project Allocation - $2,000,000)

 

15(B) Acquisition, construction,
16infrastructure and other costs related
17to new building at Glenmaura Corporate
18Center

 

19Project Allocation

2,000,000

20(Base Project Allocation - $2,000,000)

 

21(C) Construction, infrastructure and
22other costs related to sanitary sewer
23infrastructure for industrial park

 

24Project Allocation

1,000,000

25(Base Project Allocation - $1,000,000)

 

<-26(xii.1) Moscow Borough

 

27(A) Acquisition, construction,
28infrastructure, redevelopment,
29abatement of hazardous materials and
30other related costs for senior housing

 

1development

 

2Project Allocation

4,000,000

3(Base Project Allocation - $4,000,000)

 

4(xiii) Scott Township

 

5(A) Construction, infrastructure
6improvements and other costs related
7to Scott Township Technology and
8Industrial Facility redevelopment
9project

 

10Project Allocation

3,000,000

11(Base Project Allocation - $3,000,000)

 

12(xiii.1) South Abington Township

 

13(A) Acquisition, development,
14construction, infrastructure, design
15and other costs associated with the
16Abington Township Maintenance Facility

 

17Project Allocation

2,000,000

18(Base Project Allocation - $2,000,000)

 

19(B) Construction, design, infrastructure
20improvements and other costs for the
21Phelps Student Center renovation
22project at Baptist Bible College

 

23Project Allocation

1,000,000

24(Base Project Allocation - $1,000,000)

 

25(C) Acquisition, development,
26construction, infrastructure, design
27and other costs associated with a
28development project at Bible Baptist
29College

 

30Project Allocation

20,000,000

1(Base Project Allocation -
2$20,000,000)

 

3(D) Construction, design, infrastructure
4improvements and other costs for the
5Jackson Hall renovations at Bible
6Baptist College

 

7Project Allocation

2,000,000

8(Base Project Allocation - $2,000,000)

 

9(xiv) Taylor Borough

 

10(A) Acquisition, construction,
11infrastructure and other costs related
12to Taylor redevelopment
13--Colliery/Feltsville project

 

14Project Allocation

5,000,000

15(Base Project Allocation - $5,000,000)

 

16(B) Acquisition, construction,
17infrastructure and other costs related
18to Taylor Borough industrial
19redevelopment project

 

20Project Allocation

5,000,000

21(Base Project Allocation - $5,000,000)

 

22(xv) West Mifflin Borough

 

23(A) Acquisition, construction,
24infrastructure and other costs related
25to development of aviation, industrial
26and commercial sites at or surrounding
27Allegheny County Airport

 

28Project Allocation

20,000,000

29(Base Project Allocation -
30$20,000,000)

 

1(36) Lancaster County

 

2(i) County projects

 

3(A) Infrastructure upgrades, construction
4and other related costs for operating
5room expansion at Heart of Lancaster
6Regional Medical Center

 

7Project Allocation

1,500,000

8(Base Project Allocation - $1,500,000)

 

<-9(B) Acquisition, construction,
10infrastructure, redevelopment and
11other related costs for medical
12education building

 

13Project Allocation

20,000,000

14(Base Project Allocation -
15$20,000,000)

 

16(ii) Redevelopment Authority of the County of
17Lancaster

 

18(A) Acquisition, infrastructure,
19construction and other related costs
20for development and construction of
21Rock Lititz, a campus-style commercial
22park

 

23Project Allocation

7,000,000

24(Base Project Allocation - $7,000,000)

 

25(iii) City of Lancaster

 

26(A) Acquisition, design, infrastructure,
27construction and other related costs
28for renovations to North Museum of
29Natural History and Science, including
30new roof, dome and SciDome touch

 

1projection, sound and software system

 

2Project Allocation

1,000,000

3(Base Project Allocation - $1,000,000)

 

4(B) Acquisition, design, infrastructure,
5construction and other related costs
6for mixed-use facility in center of
7city to be utilized by Millersville
8University, community services and
9shopping venues

 

10Project Allocation

5,000,000

11(Base Project Allocation - $5,000,000)

 

12(C) Acquisition, design, infrastructure,
13construction and other related costs
14for state-of-the-art medical education
15building for Lancaster General College
16of Nursing and Allied Sciences

 

17Project Allocation

22,000,000

18(Base Project Allocation -
19$22,000,000)

 

20(D) Infrastructure, construction and
21other related costs for design and
22construction of state-of-the-art
23facility to be utilized as wellness
24and medical center and aquatic
25competition and leisure facility

 

26Project Allocation

22,500,000

27(Base Project Allocation -
28$22,500,000)

 

29(E) Design, infrastructure, construction
30and other related costs for

 

1renovations to emergency department
2and entrances to Lancaster Regional
3Medical Center

 

4Project Allocation

2,500,000

5(Base Project Allocation - $2,500,000)

 

<-6(F) Construction, infrastructure,
7redevelopment and other related costs
8for green infrastructure initiative

 

9Project Allocation

12,000,000

10(Base Project Allocation -
11$12,000,000)

 

12(G) Acquisition, construction,
13infrastructure, redevelopment and
14other related costs for North Prince
15Street redevelopment project

 

16Project Allocation

8,000,000

17(Base Project Allocation - $8,000,000)

 

18(H) Acquisition, construction,
19infrastructure, redevelopment and
20other related costs for revitalization
21initiatives in northeastern area

 

22Project Allocation

5,000,000

23(Base Project Allocation - $5,000,000)

 

24(I) Acquisition, construction,
25infrastructure, redevelopment and
26other related costs for redevelopment
27projects along South Market Street and
28South Prince Street

 

29Project Allocation

12,000,000

30(Base Project Allocation -

 

1$12,000,000)

 

2(J) Acquisition, construction,
3infrastructure, redevelopment and
4other related costs for revitalization
5initiatives in southwestern area

 

6Project Allocation

8,000,000

7(Base Project Allocation - $8,000,000)

 

8(K) Acquisition, construction,
9redevelopment and other related costs
10for redevelopment of former Stahr
11Armory

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

14(L) Acquisition, construction,
15infrastructure, redevelopment and
16other related costs for West King
17Street redevelopment project

 

18Project Allocation

10,000,000

19(Base Project Allocation -
20$10,000,000)

 

21(iv) Elizabethtown Borough

 

22(A) Design, infrastructure, renovations,
23abatement of hazardous materials and
24other related costs for building
25access modifications, including
26installation of card access boxes,
27video surveillance cameras, door and
28window improvements and fire control
29at Elizabethtown College

 

30Project Allocation

1,000,000

1(Base Project Allocation - $1,000,000)

 

2(B) Site development, infrastructure
3improvements, construction and
4renovation of instructional classroom
5building at Elizabethtown College

 

6Project Allocation

3,000,000

7(Base Project Allocation - $3,000,000)

 

8(C) Site development, infrastructure
9improvements, construction and other
10related costs for athletic facilities
11at Elizabethtown College

 

12Project Allocation

3,000,000

13(Base Project Allocation - $3,000,000)

 

14(D) Site development, infrastructure
15improvements, renovation, construction
16and other related costs for buildings
17and residence halls at Elizabethtown
18College

 

19Project Allocation

5,000,000

20(Base Project Allocation - $5,000,000)

 

<-21(E) Construction, renovation and other
22related costs for site development and
23infrastructure improvements of
24buildings and residence halls at
25Elizabethtown College

 

26Project Allocation

5,000,000

27(Base Project Allocation - $5,000,000)

 

28(F) Site development, infrastructure
29improvements, construction, renovation
30and other related costs for

 

1instructional classroom building at
2Elizabethtown College

 

3Project Allocation

3,000,000

4(Base Project Allocation - $3,000,000)

 

5(G) Construction and other related costs
6for athletic fields, field house,
7fitness center and wellness center for
8Elizabethtown College

 

9Project Allocation

3,000,000

10(Base Project Allocation - $3,000,000)

 

11(H) Renovations, improvements and other
12related costs for safety and security
13at Elizabethtown College

 

14Project Allocation

1,000,000

15(Base Project Allocation - $1,000,000)

 

<-16(v) Hempfield Township

 

<-17(v) West Hempfield Township

 

18(A) Purchase, renovation and other
19related costs for community homes by
20Keystone Human Services to support
21persons with intellectual disabilities

 

22Project Allocation

3,740,000

23(Base Project Allocation - $3,740,000)

 

24(vi) Manheim Township

 

25(A) Purchase, renovation and other
26related costs for community homes by
27Keystone Human Services to support
28persons with intellectual disabilities

 

29Project Allocation

3,740,000

30(Base Project Allocation - $3,740,000)

 

1(vii) Marietta Borough

 

2(A) Acquisition, site preparation,
3infrastructure, construction and other
4related costs for economic development
5projects, including development of
6museum on mixed-use site

 

7Project Allocation

10,000,000

8(Base Project Allocation -
9$10,000,000)

 

10(viii) Mt. Joy Township

 

11(A) Purchase, renovation and other
12related costs for community homes by
13Keystone Human Services to support
14persons with intellectual disabilities

 

15Project Allocation

3,740,000

16(Base Project Allocation - $3,740,000)

 

17(v) <-(ix) New Holland Borough

 

18(A) Acquisition, infrastructure,
19construction and other related costs
20to expand and modernize food products
21manufacturing facility

 

22Project Allocation

3,000,000

23(Base Project Allocation - $3,000,000)

 

<-24(x) Salisbury Township

 

25(A) Acquisition, construction,
26infrastructure improvement, including,
27but not limited to, improvements
28related to road, highway and parking
29and other related costs for direct
30fulfillment center in the area of the

 

1town of Gap

 

2Project Allocation

20,000,000

3(Base Project Allocation -
4$20,000,000)

 

5(vi) <-(xi) Warwick Township

 

6(A) Acquisition, infrastructure,
7construction and other related costs
8for development and construction of
9Rock Lititz, a campus-style commercial
10park

 

11Project Allocation

7,000,000

12(Base Project Allocation - $7,000,000)

 

13(37) Lawrence County

 

14(i) City of New Castle

 

15(A) Infrastructure, construction and
16other related costs for Jameson Health
17System expansion of ambulatory
18services, renovation and technology
19enhancements

 

20Project Allocation

5,000,000

21(Base Project Allocation - $5,000,000)

 

<-22(B) Acquisition, construction,
23infrastructure and other related costs
24for redevelopment in industrial
25corridor

 

26Project Allocation

5,000,000

27(Base Project Allocation - $5,000,000)

 

28(ii) Shenango Township

 

29(A) Construction, infrastructure and
30other related costs for industrial

 

1park

 

2Project Allocation

7,000,000

3(Base Project Allocation - $7,000,000)

 

4(iii) Union Township

 

5(A) Acquisition, construction,
6infrastructure, redevelopment and
7other related costs for mixed-use
8commerce park

 

9Project Allocation

10,000,000

10(Base Project Allocation -
11$10,000,000)

 

12(B) Acquisition, construction,
13infrastructure, redevelopment and
14other related costs for development of
15mixed-use commercial park

 

16Project Allocation

10,000,000

17(Base Project Allocation -
18$10,000,000)

 

19(iv) Wampum and New Beaver Boroughs

 

20(A) Acquisition, construction,
21infrastructure, redevelopment and
22other related costs for industrial
23parks and related projects

 

24Project Allocation

10,000,000

25(Base Project Allocation -
26$10,000,000)

 

27(38) Lebanon County

 

28(i) County projects

 

29(A) Design, engineering, infrastructure
30improvements, construction and other

 

1related costs for redevelopment of
2Good Samaritan Hospital Cancer Care
3Center

 

4Project Allocation

5,000,000

5(Base Project Allocation - $5,000,000)

 

6(B) Acquisition, infrastructure
7improvements, construction and related
8costs for development of North
9Cornwall Commons project

 

10Project Allocation

5,000,000

11(Base Project Allocation - $5,000,000)

 

<-12(ii) City of Lebanon

 

13(A) Acquisition, construction and other
14costs related to additional student
15parking for Harrisburg Area Community
16College, Lebanon Campus

 

17Project Allocation

500,000

18(Base Project Allocation - $500,000)

 

<-19(ii) (iii) Lebanon County Health Facilities
20Authority

 

21(A) Acquisition, construction,
22infrastructure and other related costs
23for Cancer Treatment Center in South
24Lebanon Township

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

<-27(iii) (iv) East Hanover Township

 

28(A) Purchase, renovation and other
29related costs for community homes to
30support persons with intellectual

 

1disabilities and development of center
2for Susquehanna Service Dogs program,
3including construction of kennels and
4renovations to create training center
5and offices by Keystone Human Services

 

6Project Allocation

3,740,000

7(Base Project Allocation - $3,740,000)

 

8(39) Lehigh County

 

9(i) Catasauqua Borough

 

10(A) Construction, infrastructure
11improvements and other costs related
12to the mixed-use Catasauqua
13redevelopment project

 

14Project Allocation

5,000,000

15(Base Project Allocation - $5,000,000)

 

<-16(B) Acquisition, construction,
17infrastructure, abatement of hazardous
18materials and other related costs for
19redevelopment project

 

20Project Allocation

5,000,000

21(Base Project Allocation - $5,000,000)

 

22(ii) City of Allentown

 

23(A) Acquisition, abatement of hazardous
24materials, redevelopment and other
25related costs for construction of
26mixed-use facility adjacent to Sacred
27Heart Hospital

 

28Project Allocation

2,500,000

29(Base Project Allocation - $2,500,000)

 

<-30(B) Infrastructure, rehabilitation,

 

1construction and renovation of health
2center facilities

 

<-3(B) Infrastructure, rehabilitation,
4construction and renovation of Lehigh
5Valley Health Network Health Center

 

6Project Allocation

3,000,000

7(Base Project Allocation - $3,000,000)

 

8(C) Construction, renovation and other
9related costs for rehabilitation of
10Sacred Heart Hospital

 

11Project Allocation

5,000,000

12(Base Project Allocation - $5,000,000)

 

13(D) Acquisition, renovations, abatement
14of hazardous materials, construction
15and other related costs for
16rehabilitation of Civic Theatre of
17Allentown

 

18Project Allocation

3,500,000

19(Base Project Allocation - $3,500,000)

 

20(E) Land acquisition, infrastructure
21improvements, construction and other
22costs related to Little Lehigh Creek
23Industrial Corridor redevelopment
24project

 

25Project Allocation

2,000,000

26(Base Project Allocation - $2,000,000)

 

27(F) Infrastructure, renovations,
28construction and other related cost
29for Miller Symphony Hall's Lyric and
30Balcony rehabilitation projects

 

1Project Allocation

250,000

2(Base Project Allocation - $250,000)

 

3(G) Acquisition, renovations,
4construction and other related cost
5for DaVinci Discovery Center of
6Science and Technology

 

7Project Allocation

2,500,000

8(Base Project Allocation - $2,500,000)

 

9(H) Acquisition, infrastructure,
10abatement of hazardous materials,
11construction and other related costs
12for development of properties in City
13of Allentown

 

14Project Allocation

1,000,000

15(Base Project Allocation - $1,000,000)

 

16(I) Acquisition, infrastructure,
17abatement of hazardous materials,
18construction and other related costs
19for redevelopment of Oakwood Medical
20Associates building

 

21Project Allocation

2,500,000

22(Base Project Allocation - $2,500,000)

 

23(J) Acquisition, infrastructure,
24abatement of hazardous materials,
25construction and other related costs
26for development of medical office
27building in the vicinity of Sacred
28Heart Hospital

 

29Project Allocation

5,000,000

30(Base Project Allocation - $5,000,000)

 

<-1(K) Renovation, rehabilitation and other
2related costs for Episcopal House
3facility

 

4Project Allocation

1,000,000

5(Base Project Allocation - $1,000,000)

 

6(L) Construction, redevelopment,
7abatement of hazardous materials and
8other related costs for sports
9medicine, rehabilitation and health
10center facilities

 

11Project Allocation

3,000,000

12(Base Project Allocation - $3,000,000)

 

13(M) Acquisition, construction,
14redevelopment, abatement of hazardous
15materials and other related costs for
16multistory adaptive reuse project

 

17Project Allocation

10,000,000

18(Base Project Allocation -
19$10,000,000)

 

20(N) Construction, infrastructure,
21abatement of hazardous materials and
22other related costs for redevelopment
23of former Agere Technologies plant
24campus

 

25Project Allocation

500,000

26(Base Project Allocation - $500,000)

 

27(O) Construction, infrastructure,
28redevelopment and other related costs
29for athletic field improvements at
30Cedar Crest College

 

1Project Allocation

2,000,000

2(Base Project Allocation - $2,000,000)

 

<-3(P) Acquisition, construction,
4infrastructure and other related costs
5for St. Luke's University Health
6Network

 

7Project Allocation

5,000,000

8(Base Project Allocation - $5,000,000)

 

9(iii) City of Bethlehem

 

10(A) Construction, infrastructure
11improvements and other costs related
12to Lehigh Valley Hospital renovation
13and expansion project

 

14Project Allocation

10,000,000

15(Base Project Allocation -
16$10,000,000)

 

<-17(B) Acquisition, construction,
18infrastructure and other related costs
19for St. Luke's University Health
20Network

 

21Project Allocation

5,000,000

22(Base Project Allocation - $5,000,000)

 

23(iv) Fountain Hill Borough

 

24(A) Construction, infrastructure
25improvements and other costs related
26to St. Luke's Hospital Bethlehem
27Campus expansion project

 

28Project Allocation

5,000,000

29(Base Project Allocation - $5,000,000)

 

30(B) Construction, infrastructure

 

1improvements and other costs related
2to storm water retention system for
3flooding mitigation in Mill 2 complex

 

4Project Allocation

1,000,000

5(Base Project Allocation - $1,000,000)

 

<-6(C) Construction, infrastructure,
7redevelopment and other related costs
8for Mill 2 projects

 

9Project Allocation

750,000

10(Base Project Allocation - $750,000)

 

11(v) Heidelberg Township

 

12(A) Acquisition, construction,
13infrastructure, abatement of hazardous
14materials and other related costs for
15municipal government center

 

16Project Allocation

2,000,000

17(Base Project Allocation - $2,000,000)

 

18(vi) North Whitehall Township

 

19(A) Construction, infrastructure and
20other related costs for adult
21inpatient hospital on KidsPeace
22Orchard Hills Campus

 

23Project Allocation

2,000,000

24(Base Project Allocation - $2,000,000)

 

25(vii) Salisbury Township

 

26(A) Construction, infrastructure and
27other related costs for renovation and
28expansion of Lehigh Valley Hospital
29Cedar Crest

 

30Project Allocation

10,000,000

1(Base Project Allocation -
2$10,000,000)

 

3(viii) South Whitehall Township

 

4(A) Construction, renovation and other
5related costs for expansion and
6development of St. Luke's Hospital
7Anderson Campus

 

8Project Allocation

20,000,000

9(Base Project Allocation -
10$20,000,000)

 

11(B) Construction, renovation and other
12related costs necessary to further
13develop St. Luke's West End Medical
14Center

 

15Project Allocation

5,000,000

16(Base Project Allocation - $5,000,000)

 

<-17(C) Construction and other related costs
18for regional EMS and Public Safety
19Center

 

20Project Allocation

3,500,000

21(Base Project Allocation - $3,500,000)

 

22(ix) Upper Macungie Township

 

23(A) Acquisition, construction,
24infrastructure, abatement of hazardous
25materials and other related costs for
26new business development

 

27Project Allocation

1,000,000

28(Base Project Allocation - $1,000,000)

 

29(B) Construction, infrastructure and
30other related costs for new police

 

1station

 

2Project Allocation

1,900,000

3(Base Project Allocation - $1,900,000)

 

4(40) Luzerne County

 

5(i) County projects

 

6(A) Acquisition, construction,
7infrastructure and other costs related
8to development of Lackawanna River
9Heritage Trail, lower section, along
10Lackawanna River

 

11Project Allocation

3,000,000

12(Base Project Allocation - $3,000,000)

 

13(B) For acquisition, construction,
14infrastructure, redevelopment,
15renovations and other costs associated
16with an economic development project
17in the county

 

18Project Allocation

7,500,000

19(Base Project Allocation - $7,500,000)

 

20(C) Land acquisition, infrastructure
21improvements, demolition, site
22improvement, renovation, addition,
23utility expansion, construction,
24purchase of medically necessary
25fixtures and other related costs for
26hospital and other related facilities
27of the Greater Hazelton Health
28Alliance

 

29Project Allocation

20,000,000

30(Base Project Allocation -

 

1$20,000,000)

 

<-2(D) Acquisition, construction,
3infrastructure and other related costs
4for 20-megawatt frequency regulation
5plant

 

6Project Allocation

10,000,000

7(Base Project Allocation -
8$10,000,000)

 

<-9(E) Construction, site preparation,
10engineering, grading, rail, ties,
11ballast, acquiring and installing rail
12scale and other related materials to
13extend siding to provide access to
14Northeast Recycling Solutions

 

15Project Allocation

2,000,000

16(Base Project Allocation - $2,000,000)

 

17(i.1) City of Hazelton

 

18(A) For the acquisition, construction,
19infrastructure, redevelopment,
20renovations and other costs associated
21with an economic development project
22in the city

 

23Project Allocation

5,000,000

24(Base Project Allocation - $5,000,000)

 

<-25(ii) City of Nanticoke

 

<-26(A) (B) Land acquisition, infrastructure
27improvements, site improvement,
28renovation, construction and other
29costs related to Greater Hazleton
30Health Alliance Health and Wellness

 

1Center

 

2Project Allocation

4,000,000

3(Base Project Allocation - $4,000,000)

 

<-4(ii) City of Nanticoke

 

<-5(B) (A) For the acquisition,
6construction, infrastructure,
7redevelopment, renovations and other
8costs associated with an economic
9development project in the city

 

10Project Allocation

5,000,000

11(Base Project Allocation - $5,000,000)

 

12(iii) City of Pittston

 

13(A) Acquisition, construction,
14infrastructure and other costs related
15to Main & Market Professional Center
16project

 

17Project Allocation

2,500,000

18(Base Project Allocation - $2,500,000)

 

19(B) For the acquisition, construction,
20infrastructure, redevelopment,
21renovations and other costs associated
22with an economic development project
23in the city

 

24Project Allocation

5,000,000

25(Base Project Allocation - $5,000,000)

 

<-26(C) Construction, infrastructure and
27other related costs for library
28expansion project

 

29Project Allocation

500,000

30(Base Project Allocation - $500,000)

 

1(iv) City of Wilkes-Barre

 

2(A) Acquisition, construction,
3infrastructure and other costs related
4to redevelopment of Citizens Bank
5Center

 

6Project Allocation

5,000,000

7(Base Project Allocation - $5,000,000)

 

8(B) Construction, infrastructure
9improvements and other costs related
10to Wilkes University engineering
11school development project

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

14(C) For the acquisition, construction,
15infrastructure, redevelopment,
16renovations and other costs associated
17with an economic development project
18in the city

 

19Project Allocation

5,000,000

20(Base Project Allocation - $5,000,000)

 

<-21(D) Acquisition, construction,
22infrastructure and other related costs
23for expansion and energy
24sustainability project at King's
25College

 

26Project Allocation

1,500,000

27(Base Project Allocation - $1,500,000)

 

<-28(E) Acquisition, construction,
29infrastructure, redevelopment,
30abatement of hazardous materials and

 

1other costs related to King's
2College's acquisition and renovation
3of the Ramada

 

4Project Allocation

7,000,000

5(Base Project Allocation - $7,000,000)

 

6(v) Dupont Borough

 

7(A) Acquisition, construction,
8infrastructure and other costs related
9to Wilkes-Barre/Scranton International
10Airport economic development project

 

11Project Allocation

2,000,000

12(Base Project Allocation - $2,000,000)

 

13(B) Acquisition, cons<-truction,
14infrastructure, redevelopment,
15abatement of hazardous materials and
16other related costs for senior housing
17development

 

18Project Allocation

4,000,000

19(Base Project Allocation - $4,000,000)

 

20(vi) Hanover Township

 

21(A) Rehabilitate existing rail
22infrastructure and construct transload
23facility, including site preparation,
24engineering, grading, rail, ties,
25ballast, switch relocation, paving,
26gravel, fabrication of concrete pad,
27acquiring and installing truck scale
28and other related materials necessary
29in the operation of the new facility

 

30Project Allocation

1,400,000

1(Base Project Allocation - $1,400,000)

 

2(vi) Plains Township

<-

3(vii) Plains Township

<-

4(A) Construction, infrastructure
5improvements and other costs related
6to Ultimate Sports facility project

 

7Project Allocation

6,000,000

8(Base Project Allocation - $6,000,000)

 

9(41) Lycoming County

 

10(i) County projects

 

11(A) Construction, rehabilitation and
12other related costs to serve NuWeld
13Corporation manufacturing facility

 

14Project Allocation

1,000,000

15(Base Project Allocation - $1,000,000)

 

16(B) Construction, demolition and other
17costs related to Williamsport Regional
18Airport terminal building project

 

19Project Allocation

3,000,000

20(Base Project Allocation - $3,000,000)

 

21(C) Design and construction of facility
22improvements, including directional
23signage, terminal building,
24renovations and parking at
25Williamsport Regional Airport

 

26Project Allocation

3,676,000

27(Base Project Allocation - $3,676,000)

 

28(D) Acquisition, rehabilitation,
29construction and other related costs
30for health care and housing facilities

 

1for Susquehanna Health System

 

2Project Allocation

20,000,000

3(Base Project Allocation -
4$20,000,000)

 

5(E) Acquisition, infrastructure,
6construction, redevelopment and other
7related costs for Susquehanna
8Community Health and Dental Center

 

9Project Allocation

10,000,000

10(Base Project Allocation -
11$10,000,000)

 

12(F) Acquisition, infrastructure,
13construction and other related costs
14for county forensic science center

 

15Project Allocation

2,000,000

16(Base Project Allocation - $2,000,000)

 

17(G) Acquisition, construction,
18infrastructure and other related costs
19for mixed-use development of land
20located at intersection of Brushy
21Ridge Road and Fairfield Road in
22Fairfield Township

 

23Project Allocation

10,000,000

24(Base Project Allocation -
25$10,000,000)

 

<-26(H) Acquisition, construction,
27redevelopment and other related costs
28for Susquehanna Health System
29facilities

 

30Project Allocation

20,000,000

1(Base Project Allocation -
2$20,000,000)

 

<-3(I) Acquisition, construction, facility
4improvements, machinery and equipment
5costs related to renovation and
6expansion with Jersey Shore Steel

 

7Project Allocation

2,500,000

8(Base Project Allocation - $2,500,000)

 

9(i.1) City of Williamsport

 

10(A) Construction, infrastructure and
11other related costs for YMCA community
12center

 

13Project Allocation

5,000,000

14(Base Project Allocation - $5,000,000)

 

15(B) Construction, infrastructure,
16abatement of hazardous materials and
17other related costs for Lycoming
18Engines Facility improvement project

 

19Project Allocation

2,255,000

20(Base Project Allocation - $2,255,000)

 

21(C) Construction, infrastructure and
22other related costs for Williamsport
23YMCA

 

24Project Allocation

5,000,000

25(Base Project Allocation - $5,000,000)

 

26(ii) Muncy Township

 

27(A) Acquisition, site preparation,
28infrastructure and construction for
29commercial and hotel development
30project to be constructed at Lycoming

 

1Mall Road and Lycoming Mall Drive

 

2Project Allocation

2,000,000

3(Base Project Allocation - $2,000,000)

 

4(42) McKean County

 

5(i) County projects

 

6(A) Acquisition, infrastructure,
7construction and other related costs
8for economic project

 

9Project Allocation

10,000,000

10(Base Project Allocation -
11$10,000,000)

 

12(ii) City of Bradford

 

13(A) Land acquisition, demolition, site
14clearance, building rehabilitation,
15building construction, site work,
16infrastructure, gateway and
17streetscape improvements, waterfront
18development, recreational projects,
19storm water management for flood
20control and other community
21improvements for economic development
22and community impact projects

 

23Project Allocation

10,000,000

24(Base Project Allocation -
25$10,000,000)

 

<-26(B) Renovation, construction and other
27related costs to modernize, expand and
28improve existing facilities of
29rehabilitation center for individuals
30with disabilities

 

1Project Allocation

1,000,000

2(Base Project Allocation - $1,000,000)

 

3(iii) Foster Township

 

4(A) Construction, site work,
5infrastructure improvements, land
6acquisition and other related costs
7for an at-risk youth education and
8treatment facility on Main Campus of
9Beacon Light in Foster Township

 

10Project Allocation

10,000,000

11(Base Project Allocation -
12$10,000,000)

 

13(43) Mercer County

 

14(i) County projects

 

15(A) Infrastructure, construction and
16other related costs for WaterFire
17Sharon riverbank development

 

18Project Allocation

400,000

19(Base Project Allocation - $400,000)

 

20(B) Infrastructure and other related
21costs for construction of multitenant
22facility in Reynolds Industrial Park

 

23Project Allocation

1,000,000

24(Base Project Allocation - $1,000,000)

 

25(C) Acquisition, infrastructure,
26construction and other related costs,
27including abatement of hazardous
28materials, for rehabilitation of
29Damascuc-Bishop Tube facility

 

30Project Allocation

1,500,000

1(Base Project Allocation - $1,500,000)

 

2(D) Acquisition, rehabilitation,
3construction and other related costs
4for development of Penn-Ohio Center
5for Arts & Technology

 

6Project Allocation

2,225,000

7(Base Project Allocation - $2,225,000)

 

<-8(E) Acquisition, construction,
9infrastructure and other related costs
10for facilities development

 

11Project Allocation

7,500,000

12(Base Project Allocation - $7,500,000)

 

13(F) Construction, infrastructure and
14other related costs for workforce
15development center

 

16Project Allocation

2,225,000

17(Base Project Allocation - $2,225,000)

 

18(G) Acquisition, construction,
19infrastructure, redevelopment and
20other related costs for health care
21center multitenant facility

 

22Project Allocation

2,000,000

23(Base Project Allocation - $2,000,000)

 

24(H) Acquisition, construction,
25infrastructure, redevelopment,
26abatement of hazardous materials and
27other related costs for redevelopment
28of industrial facility

 

29Project Allocation

2,000,000

30(Base Project Allocation - $2,000,000)

 

1(I) Acquisition, construction,
2infrastructure and other related costs
3for industrial or commercial facility

 

4Project Allocation

5,000,000

5(Base Project Allocation - $5,000,000)

 

6(ii) Greenville Area Economic Development
7Corporation

 

8(A) Acquisition, rehabilitation,
9construction and other related costs
10for redevelopment of Greenville
11Trinity Industries property

 

12Project Allocation

3,000,000

13(Base Project Allocation - $3,000,000)

 

14(B) Renovation and rehabilitation of
15historical building to transform it
16into training facility for Greenville
17Neuromodulation Clinic

 

18Project Allocation

1,000,000

19(Base Project Allocation - $1,000,000)

 

20(iii) City of Farrell

 

21(A) Acquisition, construction,
22infrastructure, redevelopment and
23other related costs for industrial
24plaza

 

25Project Allocation

2,000,000

26(Base Project Allocation - $2,000,000)

 

27(iii) <-(iv) City of Hermitage

 

28(A) Acquisition, construction, renovation
29and infrastructure improvements to
30industrial facility

 

1Project Allocation

2,000,000

2(Base Project Allocation - $2,000,000)

 

3(B) Acquisition, construction and
4infrastructure improvements for
5business park project

 

6Project Allocation

3,000,000

7(Base Project Allocation - $3,000,000)

 

<-8(C) Acquisition, construction and other
9related costs for facility development

 

10Project Allocation

1,500,000

11(Base Project Allocation - $1,500,000)

 

12(D) Acquisition, construction,
13infrastructure and other related costs
14for business park project

 

15Project Allocation

3,000,000

16(Base Project Allocation - $3,000,000)

 

17(E) Acquisition, construction,
18infrastructure and other related costs
19for industrial facility

 

20Project Allocation

2,000,000

21(Base Project Allocation - $2,000,000)

 

22(v) City of Sharon

 

23(A) Construction, infrastructure,
24redevelopment and other related costs
25for development of downtown Sharon

 

26Project Allocation

3,000,000

27(Base Project Allocation - $3,000,000)

 

28(B) Acquisition, construction,
29infrastructure, redevelopment and
30other related costs for development

 

1projects along Shenango River

 

2Project Allocation

500,000

3(Base Project Allocation - $500,000)

 

4(44) Mifflin County

 

5(i) County projects

 

6(A) Acquisition, construction,
7infrastructure and other related costs
8for a Federally Qualified Health
9Center-anchored multiservice facility

 

10Project Allocation

3,000,000

11(Base Project Allocation - $3,000,000)

 

12(ii) Mifflin County Industrial Development
13Authority

 

14(A) Acquisition, construction,
15rehabilitation and other costs related
16to design and construction of
17facilities to be utilized as branch
18campus of Pennsylvania Highlands
19Community College

 

20Project Allocation

600,000

21(Base Project Allocation - $600,000)

 

22(B) Acquisition, construction and other
23related costs for extension of public
24infrastructure within Mifflin County
25Industrial Park

 

26Project Allocation

1,000,000

27(Base Project Allocation - $1,000,000)

 

28(C) Demolition, remediation, renovations
29and infrastructure improvements to
30Mifflin County Industrial Development

 

1Corporation Plaza, a brownfield site
2located in Granville Township

 

3Project Allocation

1,250,000

4(Base Project Allocation - $1,250,000)

 

5(D) Construction, renovation,
6rehabilitation and other related costs
7for redevelopment and improvements for
8Mifflin County senior citizen housing
9units

 

10Project Allocation

3,000,000

11(Base Project Allocation - $3,000,000)

 

12(45) Monroe County

 

13(i) Barrett Township

 

14(A) Construction, infrastructure
15improvements and other costs related
16to Skytop restoration project

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(ii) Bartonsville

 

20(A) Land acquisition, construction,
21infrastructure and other related costs
22for St. Luke's University Health
23Network development project

 

24Project Allocation

20,000,000

25(Base Project Allocation -
26$20,000,000)

 

<-27(iii) Coolbaugh and Tobyhanna Townships

 

28(A) Construction, infrastructure and
29other related costs for expansion of
30natural gas main from current

 

1connection in Arcadia North Business
2Park in Coolbaugh Township to
3Tobyhanna Township

 

4Project Allocation

5,000,000

5(Base Project Allocation - $5,000,000)

 

6(iv) Pocono Township

 

7(A) Construction, infrastructure and
8other related costs for expansion of
9natural gas service to center of
10Monroe County

 

11Project Allocation

5,000,000

12(Base Project Allocation - $5,000,000)

 

<-13(v) Stroudsburg Borough

 

14(A) Acquisition, construction,
15redevelopment and other related costs
16for new YMCA

 

17Project Allocation

8,000,000

18(Base Project Allocation - $8,000,000)

 

19(vi) Tunkhannock Township

 

20(A) Construction, renovation,
21infrastructure, utilities, structural
22and other related costs for facility
23improvements at the Pocono Raceway

 

24Project Allocation

15,000,000

25(Base Project Allocation -
26$15,000,000)

 

27(46) Montgomery County

 

28(i) County projects

 

29(A) Acquisition, infrastructure,
30construction and other related costs

 

1for renovation and expansion of
2Rosemont College's Cardinal Hall

 

3Project Allocation

2,500,000

4(Base Project Allocation - $2,500,000)

 

<-5(B) Rehabilitation of railroad, including
6track improvements, siding extensions,
7visitors centers, equipment and
8equipment maintenance facility,
9construction and related work to
10enhance economic development
11opportunities and preserve corridor
12for future freight traffic in Berks
13and Montgomery Counties

 

14Project Allocation

10,000,000

15(Base Project Allocation -
16$10,000,000)

 

17(ii) Redevelopment Authority of the County of
18Montgomery

 

19(A) Acquisition, infrastructure,
20construction, renovation and
21redevelopment of mill building located
22at Beech and Evans Streets in Borough
23of Pottstown

 

24Project Allocation

1,000,000

25(Base Project Allocation - $1,000,000)

 

26(B) Acquisition, infrastructure,
27construction, renovation and
28redevelopment of Empire Firehouse
29located at Franklin and Chestnut
30Streets in Borough of Pottstown

 

1Project Allocation

1,000,000

2(Base Project Allocation - $1,000,000)

 

3(C) Acquisition, infrastructure,
4construction and development of health
5complex on campus of Pottstown
6Memorial Medical Center in Borough of
7Pottstown

 

8Project Allocation

3,000,000

9(Base Project Allocation - $3,000,000)

 

10(D) Site preparation, infrastructure,
11construction and other related costs
12for construction and development of
13mixed-use commercial center at the
14intersection of Route 100 and Market
15Street in Douglas Township

 

16Project Allocation

4,000,000

17(Base Project Allocation - $4,000,000)

 

<-18(ii.1) Abington Township

 

19(A) Construction and other related costs
20for athletic league building

 

21Project Allocation

1,000,000

22(Base Project Allocation - $1,000,000)

 

23(B) Construction and other related costs
24for ambulatory services unit
25renovation

 

26Project Allocation

1,000,000

27(Base Project Allocation - $1,000,000)

 

28(C) Construction and other related costs
29for inpatient orthopedic unit project

 

30Project Allocation

2,188,000

1(Base Project Allocation - $2,188,000)

 

2(ii.2) Borough of Ambler

 

3(A) Infrastructure, redevelopment,
4construction and other related costs
5for parking garage on Lindenwold
6Avenue

 

7Project Allocation

1,700,000

8(Base Project Allocation - $1,700,000)

 

9(iii) Borough of Hatboro

 

10(A) Infrastructure, construction and
11other related costs for
12rehabilitation, expansion and
13modernization of borough facilities,
14including Borough Hall, police station
15and public works building

 

16Project Allocation

1,500,000

17(Base Project Allocation - $1,500,000)

 

<-18(B) Acquisition, infrastructure,
19preservation and other related costs
20for reuse of existing historic factory

 

21Project Allocation

2,500,000

22(Base Project Allocation - $2,500,000)

 

23(iv) Cheltenham Township

 

24(A) Construction, infrastructure
25improvements, including rehabilitation
26of sanitary sewer system, and other
27related costs for business development

 

28Project Allocation

6,000,000

29(Base Project Allocation - $6,000,000)

 

30(B) Construction, infrastructure

 

1improvements and other costs related
2to pedestrian signals and crossings

 

3Project Allocation

1,750,000

4(Base Project Allocation - $1,750,000)

 

5(C) Construction, infrastructure
6improvements and other costs related
7to Elkins Park West streetscape and
8transportation enhancement project

 

9Project Allocation

3,000,000

10(Base Project Allocation - $3,000,000)

 

11(D) Acquisition, infrastructure,
12construction and other related costs
13for relocation of Public Works
14facility

 

15Project Allocation

7,500,000

16(Base Project Allocation - $7,500,000)

 

<-17(E) Construction and other related costs
18for a fire station expansion project

 

19Project Allocation

225,000

20(Base Project Allocation - $225,000)

 

21(F) Acquisition, construction,
22redevelopment and other related costs
23for public works facility relocation

 

24Project Allocation

7,500,000

25(Base Project Allocation - $7,500,000)

 

26(G) Construction, infrastructure and
27other related costs for streetscape
28and other enhancements in Elkins Park
29West Commercial District

 

30Project Allocation

1,650,000

1(Base Project Allocation - $1,650,000)

 

2(H) Construction, infrastructure and
3other related costs for intersection
4improvements

 

5Project Allocation

875,000

6(Base Project Allocation - $875,000)

 

7(I) Construction, infrastructure and
8other related costs for projects
9related to sewer system

 

10Project Allocation

6,000,000

11(Base Project Allocation - $6,000,000)

 

12(J) Construction and other related costs
13for theatre and auditorium
14revitalization project

 

15Project Allocation

742,000

16(Base Project Allocation - $742,000)

 

17(K) Acquisition, construction and other
18related costs for redevelopment of
19former Tyler Estate and surrounding
20properties in Elkins Park

 

21Project Allocation

7,500,000

22(Base Project Allocation - $7,500,000)

 

23(L) Acquisition, construction,
24infrastructure and other costs related
25to Glenside area flood protection
26project

 

27Project Allocation

8,000,000

28(Base Project Allocation - $8,000,000)

 

29(M) Construction, infrastructure and
30other costs related to Glenside area

 

1flood protection project, Phase II, in
2Cheltenham Township along Tookany
3Creek

 

4Project Allocation

3,000,000

5(Base Project Allocation - $3,000,000)

 

6(N) Construction, infrastructure and
7other related costs for Tookany Creek
8headwaters flood control project

 

9Project Allocation

1,000,000

10(Base Project Allocation - $1,000,000)

 

11(v) Conshohocken Borough

 

12(A) Construction, infrastructure
13improvements and other costs related
14to Verizon Building remediation and
15adaptive reuse project

 

16Project Allocation

4,391,000

17(Base Project Allocation - $4,391,000)

 

18(B) Construction, infrastructure
19improvements and other costs related
20to Seven Tower Bridge development
21project

 

22Project Allocation

5,000,000

23(Base Project Allocation - $5,000,000)

 

<-24(C) Construction, infrastructure,
25redevelopment, abatement of hazardous
26materials and other related costs for
27redevelopment project at site of
28former Verizon building

 

29Project Allocation

3,821,000

30(Base Project Allocation - $3,821,000)

 

<-1(D) Construction, infrastructure,
2redevelopment and other related costs
3for development at First and Fayette
4Streets

 

5Project Allocation

10,000,000

6(Base Project Allocation -
7$10,000,000)

 

8(vi) East Norriton Township

 

9(A) Construction, infrastructure
10improvements and other costs related
11to renovation of patient rooms

 

12Project Allocation

2,000,000

13(Base Project Allocation - $2,000,000)

 

14(vii) Lower Gwynedd Township

 

15(A) Acquisition, infrastructure,
16construction and other related costs
17for Phase III of Bethlehem Pike
18revitalization project, including
19streetscape and safety improvements

 

20Project Allocation

500,000

21(Base Project Allocation - $500,000)

 

22(viii) Lower Merion Township

 

23(A) Construction, infrastructure
24improvements and other costs related
25to expansion of Ardmore Train Station
26transit and parking improvements
27project

 

28Project Allocation

10,000,000

29(Base Project Allocation -
30$10,000,000)

 

1(B) Construction, infrastructure
2improvements and other costs related
3to Rosemont College building
4renovations

 

5Project Allocation

5,000,000

6(Base Project Allocation - $5,000,000)

 

7(ix) Lower Providence Township

 

8(A) Infrastructure, construction and
9other related costs, including
10abatement of hazardous materials, for
11redevelopment of Rittenhouse Road CSG
12Superfund site located in Park Pointe
13at Lower Providence Business Park

 

14Project Allocation

2,500,000

15(Base Project Allocation - $2,500,000)

 

16(x) Montgomery Township

 

17(A) Infrastructure, redevelopment and
18construction of multipurpose
19recreational community center

 

20Project Allocation

5,000,000

21(Base Project Allocation - $5,000,000)

 

22(xi) Norristown Borough

 

23(A) Construction, infrastructure
24improvements and other costs related
25to new mixed-income development in
26downtown Norristown

 

27Project Allocation

1,500,000

28(Base Project Allocation - $1,500,000)

 

29(B) Construction, infrastructure
30improvements and renovations for the

 

1Elmwood Park Zoo Protect the Park
2project

 

3Project Allocation

750,000

4(Base Project Allocation - $750,000)

 

<-5(C) Construction, infrastructure,
6redevelopment, abatement of hazardous
7materials and other related costs for
8medical office building

 

9Project Allocation

5,000,000

10(Base Project Allocation - $5,000,000)

 

11(D) Acquisition, construction,
12infrastructure, redevelopment and
13other related costs for supermarket
14project on Markley Street

 

15Project Allocation

2,500,000

16(Base Project Allocation - $2,500,000)

 

<-17(E) Construction, infrastructure,
18redevelopment and other related costs
19for the George Washington Carver
20Community Center

 

21Project Allocation

2,000,000

22(Base Project Allocation - $2,000,000)

 

23(xi.1) Plymouth Township

 

24(A) Construction, infrastructure
25improvements and renovations for the
26East Plymouth Valley Park Little
27League facility

 

28Project Allocation

300,000

29(Base Project Allocation - $300,000)

 

30(xii) Springfield Township

 

1(A) Construction, infrastructure
2improvements and other costs related
3to Wordsworth Academy Fort Washington
4project

 

5Project Allocation

2,500,000

6(Base Project Allocation - $2,500,000)

 

7(xiii) Upper Dublin Township

 

8(A) Acquisition, renovation,
9infrastructure development, site
10preparation and construction to
11support redevelopment and
12revitalization of Fort Washington
13Office Park

 

14Project Allocation

10,000,000

15(Base Project Allocation -
16$10,000,000)

 

17(xiv) Upper Merion Township

 

18(A) Construction, infrastructure
19improvements and other costs related
20to DeKalb/Gulph redevelopment project

 

21Project Allocation

3,000,000

22(Base Project Allocation - $3,000,000)

 

<-23(B) Construction and other related costs
24for ambulance station project

 

25Project Allocation

900,000

26(Base Project Allocation - $900,000)

 

27(C) Construction, infrastructure,
28redevelopment and other related costs
29for senior center project

 

30Project Allocation

3,000,000

1(Base Project Allocation - $3,000,000)

 

<-2(D) Construction, infrastructure,
3redevelopment and other related costs
4for projects related to Triad
5commercial office facility in King of
6Prussia

 

7Project Allocation

3,000,000

8(Base Project Allocation - $3,000,000)

 

9(xv) Upper Moreland Township

 

10(A) Construction, infrastructure
11improvements and other related costs
12for Willow Grove Industrial Commons,
13including construction of regional
14storm water management basin to
15improve economic development of the
16area

 

17Project Allocation

500,000

18(Base Project Allocation - $500,000)

 

<-19(xvi) Upper Providence Township

 

20(A) Construction, infrastructure and
21other related costs for Montgomery
22County Pope John Paul II High School
23stadium project

 

24Project Allocation

500,000

25(Base Project Allocation - $500,000)

 

26(xvi) <-(xvii) Whitemarsh Township

 

27(A) Construction, infrastructure
28improvements and other costs related
29to AIM Institute for Learning and
30Research redevelopment and expansion

 

1project

 

2Project Allocation

3,500,000

3(Base Project Allocation - $3,500,000)

 

<-4(xviii) Whitpain Township

 

5(A) Construction, infrastructure and
6other related costs for renovation of
7Montgomery County Community College
8Science Center's west wing

 

9Project Allocation

1,500,000

10(Base Project Allocation - $1,500,000)

 

11(47) Montour County

 

12(i) (Reserved)

 

13(48) Northampton County

 

14(i) County projects

 

<-15(A) Acquisition, construction,
16infrastructure and other costs related
17to community-based outpatient health
18services facility

 

<-19(A) Acquisition, construction,
20infrastructure and other costs related
21to community-based outpatient health
22services facility for Lehigh Valley
23Health Network

 

24Project Allocation

8,000,000

25(Base Project Allocation - $8,000,000)

 

26(B) Acquisition, construction,
27infrastructure and other costs related
28to renovation of mixed-use buildings
29in urban areas

 

30Project Allocation

2,000,000

1(Base Project Allocation - $2,000,000)

 

2(C) Acquisition, construction,
3infrastructure and other costs related
4to warehouse facility project

 

5Project Allocation

5,000,000

6(Base Project Allocation - $5,000,000)

 

7(ii) Bethlehem Township

 

8(A) Construction, renovation and other
9related costs to expand and further
10develop St. Luke's Hospital Anderson
11Campus

 

12Project Allocation

20,000,000

13(Base Project Allocation -
14$20,000,000)

 

15(B) Site development and infrastructure
16improvements for Highland Avenue and
17Mowrer Drive industrial sites

 

18Project Allocation

500,000

19(Base Project Allocation - $500,000)

 

20(iii) City of Bethlehem

 

21(A) Construction, renovation,
22infrastructure and other related costs
23to ArtsQuest renovation project

 

24Project Allocation

1,000,000

25(Base Project Allocation - $1,000,000)

 

26(B) Acquisition, construction,
27infrastructure improvements and other
28costs for the development of a
29regional convention center and related
30improvements in the city

 

1Project Allocation

25,000,000

2(Base Project Allocation -
3$25,000,000)

 

<-4(C) Construction and other related costs
5for hotel and leisure training center

 

6Project Allocation

10,000,000

7(Base Project Allocation -
8$10,000,000)

 

9(D) Construction and other related costs
10for technology center

 

11Project Allocation

10,000,000

12(Base Project Allocation -
13$10,000,000)

 

14(iv) City of Easton

 

15(A) Acquisition, construction,
16infrastructure and other costs related
17to High School Sports Hall of Fame
18museum

 

19Project Allocation

5,000,000

20(Base Project Allocation - $5,000,000)

 

21(B) Acquisition, construction,
22infrastructure and other costs related
23to redevelopment of mixed-use
24building, including structured parking
25on Ferry Street

 

26Project Allocation

3,000,000

27(Base Project Allocation - $3,000,000)

 

28(C) Acquisition, construction,
29infrastructure and other costs related
30to redevelopment of mixed-use

 

1buildings, including parking and park
2infrastructure improvements to Centre
3Square

 

4Project Allocation

10,000,000

5(Base Project Allocation -
6$10,000,000)

 

7(D) Construction, infrastructure and
8other costs related to redevelopment
9of mixed-use commercial/office
10building with integrated parking and
11residential upper floor

 

12Project Allocation

1,156,000

13(Base Project Allocation - $1,156,000)

 

14(E) Acquisition, construction,
15infrastructure and other costs related
16to Marquis Commons project

 

17Project Allocation

2,000,000

18(Base Project Allocation - $2,000,000)

 

19(F) Acquisition and redevelopment of the
20Governor Wolf Building for mixed use

 

21Project Allocation

5,000,000

22(Base Project Allocation - $5,000,000)

 

<-23(G) Acquisition, construction,
24redevelopment and other related costs
25for a sports hall of fame museum

 

26Project Allocation

5,000,000

27(Base Project Allocation - $5,000,000)

 

28(H) Construction, redevelopment and other
29related costs for Governor Wolf
30Building

 

1Project Allocation

2,000,000

2(Base Project Allocation - $2,000,000)

 

3(I) Acquisition, construction and other
4related costs for redevelopment of
5Ferry Street

 

6Project Allocation

3,000,000

7(Base Project Allocation - $3,000,000)

 

8(J) Acquisition, construction and other
9related costs for redevelopment of
10Centre Square

 

11Project Allocation

10,000,000

12(Base Project Allocation -
13$10,000,000)

 

14(v) East Allen Township

 

15(A) Infrastructure and related site costs
16for Shoppes at Route 512 and East
17Allen Marketplace renovation project

 

18Project Allocation

600,000

19(Base Project Allocation - $600,000)

 

<-20(B) Acquisition, construction,
21infrastructure and other related costs
22for municipal facility

 

23Project Allocation

785,000

24(Base Project Allocation - $785,000)

 

25(C) Renovation and rehabilitation of
26Weaversville Intensive Treatment Unit
27Facility for municipal services
28building

 

29Project Allocation

2,000,000

30(Base Project Allocation - $2,000,000)

 

1(D) Land acquisition, construction and
2other related costs for municipal
3facility

 

4Project Allocation

785,000

5(Base Project Allocation - $785,000)

 

6(vi) East Bangor Borough

 

7(A) Construction, infrastructure and
8other costs related to development of
9government center, heritage center and
10community disaster center

 

11Project Allocation

150,000

12(Base Project Allocation - $150,000)

 

<-13(vi.1) Freemansburg Borough

 

14(A) Construction, infrastructure and
15other related costs for fire,
16administration and public works
17department facilities

 

18Project Allocation

1,800,000

19(Base Project Allocation - $1,800,000)

 

20(vii) Hellertown Borough

 

21(A) Acquisition, construction,
22infrastructure and other costs related
23to rehabilitation of former Champion
24Spark Plug facility

 

25Project Allocation

2,500,000

26(Base Project Allocation - $2,500,000)

 

27(viii) Lower Nazareth

 

28(A) Acquisition, construction,
29infrastructure and other costs related
30to industrial park in Nazareth area

 

1Project Allocation

10,000,000

2(Base Project Allocation -
3$10,000,000)

 

4(ix) Portland Borough

 

5(A) Acquisition of land and construction
6of office building in Portland
7Industrial Park

 

8Project Allocation

4,500,000

9(Base Project Allocation - $4,500,000)

 

10(x) Upper Mt. Bethel Township

 

11(A) Acquisition, construction,
12infrastructure and other costs related
13to industrial park project

 

14Project Allocation

10,000,000

15(Base Project Allocation -
16$10,000,000)

 

17(B) Acquisition of land and construction
18of office building in Portland
19Industrial Park

 

20Project Allocation

4,500,000

21(Base Project Allocation - $4,500,000)

 

22(49) Northumberland County

 

23(i) County projects

 

24(A) Redevelopment and other costs related
25to construction of state-of-the-art
26carbon processing facility located at
27Shamokin Carbons

 

28Project Allocation

5,000,000

29(Base Project Allocation - $5,000,000)

 

30(ii) Northumberland County Industrial

 

1Development Authority

 

2(A) Infrastructure, renovation,
3construction and other related costs
4for expansion of Strong Industries
5manufacturing facility

 

6Project Allocation

3,000,000

7(Base Project Allocation - $3,000,000)

 

8(iii) Ci<-ty of Sunbury

 

9(A) Acquisition, construction,
10infrastructure, development and other
11costs related to redevelopment of
12former industrial site for new and
13expanding businesses

 

14Project Allocation

4,000,000

15(Base Project Allocation - $4,000,000)

 

16(50) Perry County

 

17(i) (Reserved)

 

18(51) Philadelphia County

 

19(i) County projects

 

20(A) Renovation of biology labs and
21associated prep rooms at Community
22College of Philadelphia's main campus
23and West Regional Center

 

24Project Allocation

2,000,000

25(Base Project Allocation - $2,000,000)

 

26(B) Land acquisition, construction,
27infrastructure and other related costs
28for design and construction of
29National Native American Museum

 

30Project Allocation

15,000,000

1(Base Project Allocation -
2$15,000,000)

 

3(C) Construction, infrastructure
4improvements and related costs for the
5development of a museum

 

6Project Allocation

50,000,000

7(Base Project Allocation -
8$50,000,000)

 

<-9(D) Infrastructure in support of downtown
10highrise office and hotel development,
11reconstruction of public streets and
12sidewalks and expanded connections to
13existing mass transit system

 

14Project Allocation

30,000,000

15(Base Project Allocation -
16$30,000,000)

 

17(E) Acquisition, construction,
18reconstruction, rehabilitation,
19remediation, infrastructure
20improvements, including improvements
21related to parking and common areas,
22and other related costs for
23redevelopment and reuse of Building 22
24located at former Philadelphia Naval
25Yard

 

26Project Allocation

20,000,000

27(Base Project Allocation -
28$20,000,000)

 

29(F) Acquisition, construction,
30reconstruction, rehabilitation,

 

1remediation, infrastructure
2improvements, including improvements
3related to parking and common areas,
4and other related costs for
5redevelopment and reuse of Building 18
6located at former Philadelphia Naval
7Yard

 

8Project Allocation

20,000,000

9(Base Project Allocation -
10$20,000,000)

 

11(G) Acquisition, construction,
12reconstruction, rehabilitation,
13remediation, infrastructure
14improvements, including improvements
15related to parking and common areas,
16and other related costs for
17redevelopment and reuse of Building 16
18located at former Philadelphia Naval
19Yard

 

20Project Allocation

20,000,000

21(Base Project Allocation -
22$20,000,000)

 

23(H) Acquisition, construction,
24reconstruction, rehabilitation,
25remediation, infrastructure
26improvements, including improvements
27related to parking and common areas,
28and other related costs for
29redevelopment and reuse of Building 19
30located at former Philadelphia Naval

 

1Yard

 

2Project Allocation

20,000,000

3(Base Project Allocation -
4$20,000,000)

 

5(I) Acquisition, construction,
6reconstruction, rehabilitation,
7remediation, infrastructure
8improvements, including improvements
9related to parking and common areas,
10and other related costs for
11redevelopment and reuse of Building 17
12located at former Philadelphia Naval
13Yard

 

14Project Allocation

20,000,000

15(Base Project Allocation -
16$20,000,000)

 

17(J) Construction, redevelopme<-nt,
18infrastructure and other related costs
19for Woodmere Art Museum construction
20and expansion project

 

21Project Allocation

6,100,000

22(Base Project Allocation - $6,100,000)

 

23(K) Acquisition, construction,
24infrastructure and other related costs
25for an economic development project

 

26Project Allocation

100,000,000

27(Base Project Allocation -
28$100,000,000)

 

29(L) Construction, developme<-nt,
30rehabilitation, infrastructure

 

1improvements, environmental
2remediation, renovation,
3beautification, pedestrian
4accessibility improvements, enhanced
5security improvements and other
6related costs to revitalize the 40th
7Street Trolley Portal

 

8Project Allocation

1,000,000

9(Base Project Allocation - $1,000,000)

 

10(ii) City of Philadelphia

 

11(A) Construction, infrastructure,
12rehabilitation improvements and other
13costs related to Moore College of Art
14& Design project

 

15Project Allocation

4,000,000

16(Base Project Allocation - $4,000,000)

 

17(B) Construction and other related costs
18for Cascia Center of the National
19Shrine of Saint Rita project

 

20Project Allocation

1,000,000

21(Base Project Allocation - $1,000,000)

 

22(C) Construction, infrastructure and
23other costs related to Hotel Indigo
24project

 

25Project Allocation

35,000,000

26(Base Project Allocation -
27$35,000,000)

 

28(D) Construction, infrastructure and
29other costs related to Reading Viaduct
30project

 

1Project Allocation

3,500,000

2(Base Project Allocation - $3,500,000)

 

3(E) Construction, infrastructure and
4other costs related to Penn Treaty
5Village project

 

6Project Allocation

55,000,000

7(Base Project Allocation -
8$55,000,000)

 

9(F) For building, gallery, exhibit and
10site restoration, renovation,
11construction, infrastructure and
12technology upgrades at Franklin
13Institute

 

14Project Allocation

25,000,000

15(Base Project Allocation -
16$25,000,000)

 

17(G) Construction, infrastructure and
18other related costs for Russell Byers
19Charter School expansion project

 

20Project Allocation

3,125,000

21(Base Project Allocation - $3,125,000)

 

22(H) Construction, infrastructure and
23other costs related to Live Arts
24Festival and Philly Fringe Arts Center
25project

 

26Project Allocation

500,000

27(Base Project Allocation - $500,000)

 

28(I) Construction, infrastructure and
29other costs related to Convention
30Center Hotel mixed-use project

 

1Project Allocation

30,000,000

2(Base Project Allocation -
3$30,000,000)

 

4(J) Construction, infrastructure and
5other costs related to Proto Brewery
6Hotel project

 

7Project Allocation

5,000,000

8(Base Project Allocation - $5,000,000)

 

9(K) Construction, infrastructure and
10other costs related to Stables
11redevelopment project

 

12Project Allocation

3,000,000

13(Base Project Allocation - $3,000,000)

 

14(L) Construction, infrastructure and
15other costs related to Tulip Street
16redevelopment project

 

17Project Allocation

500,000

18(Base Project Allocation - $500,000)

 

19(M) Construction, infrastructure and
20other costs related to Columbia Street
21redevelopment project

 

22Project Allocation

1,000,000

23(Base Project Allocation - $1,000,000)

 

24(N) Acquisition, construction,
25infrastructure and other costs related
26to 1010 Avenue of the Arts New
27Headquarters Campus Civic Culture Hub
28project

 

29Project Allocation

8,000,000

30(Base Project Allocation - $8,000,000)

 

1(O) Construction, infrastructure and
2other costs related to Pro-Square
3Kingsessing Nursing Home project

 

4Project Allocation

7,500,000

5(Base Project Allocation - $7,500,000)

 

6(P) Redevelopment, construction,
7infrastructure and other costs related
8to Jasper Street Manufacturing
9Facility project

 

10Project Allocation

1,250,000

11(Base Project Allocation - $1,250,000)

 

12(Q) Redevelopment, construction,
13infrastructure and other costs related
14to AC Linen Laundry commercial project

 

15Project Allocation

5,000,000

16(Base Project Allocation - $5,000,000)

 

17(R) Redevelopment, construction,
18infrastructure and other costs related
19to Convention Center Hotel project at
2015th and Race Streets

 

21Project Allocation

30,000,000

22(Base Project Allocation -
23$30,000,000)

 

24(S) Facilities construction,
25infrastructure, storm water management
26and restoration of tidal wetland for
27Penn Treaty Park Phase I project

 

28Project Allocation

10,000,000

29(Base Project Allocation -
30$10,000,000)

 

1(T) Facilities construction,
2infrastructure, renovations and other
3costs related to Franklin Delano
4Roosevelt Park

 

5Project Allocation

10,000,000

6(Base Project Allocation -
7$10,000,000)

 

8(U) Construction, infrastructure and
9other costs related to Salvation Army
10Eliza Shirley Campus project

 

11Project Allocation

1,750,000

12(Base Project Allocation - $1,750,000)

 

13(V) Acquisition, construction,
14infrastructure and other costs related
15to KIPP Philadelphia School project

 

16Project Allocation

3,500,000

17(Base Project Allocation - $3,500,000)

 

18(W) Construction, infrastructure and
19other costs related to East Falls
20streetscape project

 

21Project Allocation

2,500,000

22(Base Project Allocation - $2,500,000)

 

23(X) Construction, infrastructure and
24other costs related to Eastern
25Pennsylvania Psychiatric Institute
26redevelopment project

 

27Project Allocation

5,000,000

28(Base Project Allocation - $5,000,000)

 

29(Y) Construction, demolition,
30acquisition, infrastructure,

 

1redevelopment and other related costs
2for campus improvements and facilities
3expansion at Philadelphia University

 

4Project Allocation

20,000,000

5(Base Project Allocation -
6$20,000,000)

 

7(Z) Acquisition, construction,
8infrastructure and other costs related
9to Women's Domestic Violence Shelter
10residential and commercial facility
11project

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

14(AA) Acquisition, construction,
15infrastructure and other costs related
16to Free Library of Philadelphia George
17Institute renovation and building
18project

 

19Project Allocation

3,000,000

20(Base Project Allocation - $3,000,000)

 

21(BB) Construction, infrastructure and
22other costs related to University City
23Science Center build-out project

 

24Project Allocation

5,000,000

25(Base Project Allocation - $5,000,000)

 

26(CC) Construction, infrastructure,
27renovations and other costs for Please
28Touch Museum restoration project

 

29Project Allocation

1,500,000

30(Base Project Allocation - $1,500,000)

 

1(DD) Acquisition, clearing, demolition,
2renovation, environmental remediation,
3construction, infrastructure, design,
4streets, utilities and other costs
5associated with development of
6Innovation Neighborhood by Drexel
7University

 

8Project Allocation

30,000,000

9(Base Project Allocation -
10$30,000,000)

 

11(EE) Construction, infrastructure,
12renovations and other costs for
13Gaudenzia Foundation Family Center

 

14Project Allocation

4,500,000

15(Base Project Allocation - $4,500,000)

 

16(FF) Construction, infrastructure,
17renovations and other costs for North
18Philadelphia Health System St.
19Joseph's Hospital & Girard Medical
20Center

 

21Project Allocation

7,500,000

22(Base Project Allocation - $7,500,000)

 

23(GG) Infrastructure improvements,
24including electrical and technology
25upgrades for Holy Family University

 

26Project Allocation

1,000,000

27(Base Project Allocation - $1,000,000)

 

28(HH) Construction, infrastructure,
29renovations and other costs for Holy
30Family University Marian Hall project

 

1Project Allocation

5,000,000

2(Base Project Allocation - $5,000,000)

 

3(II) Construction, infrastructure,
4renovations and other costs for
5revitalization of former Frankford
6Arsenal as Shopping Center at the
7ARSENAL

 

8Project Allocation

2,500,000

9(Base Project Allocation - $2,500,000)

 

10(JJ) Construction, infrastructure and
11other costs related to plant upgrades
12at S. D. Richman Sons, Inc., facility
13for automobile shredder project in
14Port Richmond

 

15Project Allocation

5,000,000

16(Base Project Allocation - $5,000,000)

 

17(KK) Construction, infrastructure,
18renovations and other costs for Fox
19Chase Cancer Center Comparative
20Medical Research Facility

 

21Project Allocation

8,000,000

22(Base Project Allocation - $8,000,000)

 

23(LL) Construction, infrastructure and
24other costs related to Fox Chase
25Cancer Center physicians office
26building project

 

27Project Allocation

8,000,000

28(Base Project Allocation - $8,000,000)

 

29(MM) Construction, infrastructure and
30other costs related to Fox Chase

 

1Cancer Center Outpatient Chemotherapy
2Infusion Center

 

3Project Allocation

3,000,000

4(Base Project Allocation - $3,000,000)

 

5(NN) Construction, infrastructure,
6renovations and other costs for Fox
7Chase Cancer Center Laboratory
8Research and shared resource
9facilities

 

10Project Allocation

7,000,000

11(Base Project Allocation - $7,000,000)

 

12(OO) Construction, infrastructure,
13renovations and other costs for Fox
14Chase Cancer Center Conference Center

 

15Project Allocation

1,500,000

16(Base Project Allocation - $1,500,000)

 

17(PP) Construction, infrastructure,
18renovations and other costs for Fox
19Chase Cancer Center central utility
20plant upgrades

 

21Project Allocation

4,000,000

22(Base Project Allocation - $4,000,000)

 

23(QQ) Demolition, acquisition,
24construction, infrastructure and other
25costs for Liddonfield revitalization,
26renovation and rehabilitation project

 

27Project Allocation

35,000,000

28(Base Project Allocation -
29$35,000,000)

 

30(RR) Construction, infrastructure,

 

1renovations and other costs for
2Independence Visitor Center service
3desk improvement project

 

4Project Allocation

500,000

5(Base Project Allocation - $500,000)

 

6(SS) Acquisition, construction,
7infrastructure improvements and other
8costs related to Parkwood Therapeutic
9Riding Center expansion and
10revitalization project

 

11Project Allocation

1,500,000

12(Base Project Allocation - $1,500,000)

 

13(TT) Acquisition, construction,
14infrastructure improvements and other
15costs related to Bustleton Bengals
16Gymnasium

 

17Project Allocation

750,000

18(Base Project Allocation - $750,000)

 

19(UU) Acquisition, construction,
20infrastructure improvements and other
21costs related to manufacturing
22facility near intersection of Comly
23Road and Roosevelt Boulevard in
24Northeast Philadelphia

 

25Project Allocation

2,500,000

26(Base Project Allocation - $2,500,000)

 

27(VV) Construction, infrastructure and
28other costs related to Methodist Home
29for Children incubator/shared kitchen
30program

 

1Project Allocation

500,000

2(Base Project Allocation - $500,000)

 

3(WW) Construction, infrastructure and
4other costs related to West 59th and
5Market Streets mixed-use, transit-
6oriented development project

 

7Project Allocation

2,000,000

8(Base Project Allocation - $2,000,000)

 

9(XX) Acquisition, construction,
10infrastructure, redevelopment and
11other costs related to Green Tree
12School development project

 

13Project Allocation

1,000,000

14(Base Project Allocation - $1,000,000)

 

15(YY) Construction, infrastructure and
16other costs related to Schuylkill
17Crossing at Grays Ferry redevelopment
18project

 

19Project Allocation

6,000,000

20(Base Project Allocation - $6,000,000)

 

21(ZZ) Construction, infrastructure and
22other costs related to Wistar
23Institute administrative operations
24space retrofit project

 

25Project Allocation

1,500,000

26(Base Project Allocation - $1,500,000)

 

27(AAA) Construction, infrastructure and
28other costs related to Wistar
29Institute class A laboratory
30conversion project

 

1Project Allocation

1,600,000

2(Base Project Allocation - $1,600,000)

 

3(BBB) Construction, infrastructure and
4other costs related to Boys' Latin of
5Philadelphia Charter School Middle
6School building project

 

7Project Allocation

700,000

8(Base Project Allocation - $700,000)

 

9(CCC) Acquisition, infrastructure,
10construction, redevelopment and other
11related costs for Greater Philadelphia
12Health Action

 

13Project Allocation

10,000,000

14(Base Project Allocation -
15$10,000,000)

 

16(DDD) Acquisition, infrastructure,
17construction, redevelopment and other
18related costs for Wynnefield
19Multipurpose Center

 

20Project Allocation

1,500,000

21(Base Project Allocation - $1,500,000)

 

22(EEE) Construction, infrastructure and
23other costs related to medical
24education center at University of
25Pennsylvania Perelman School of
26Medicine

 

27Project Allocation

15,000,000

28(Base Project Allocation -
29$15,000,000)

 

30(FFF) Construction, infrastructure and

 

1other costs related to University of
2Pennsylvania's Walnut Street Gateway
3streetscape project

 

4Project Allocation

1,500,000

5(Base Project Allocation - $1,500,000)

 

6(GGG) Construction, infrastructure and
7other costs related to Wynne Ballroom
8redevelopment mixed-use facility
9project

 

10Project Allocation

200,000

11(Base Project Allocation - $200,000)

 

12(HHH) Construction, infrastructure and
13other costs related to Magee
14Rehabilitation Hospital improvement
15project

 

16Project Allocation

500,000

17(Base Project Allocation - $500,000)

 

18(III) Construction, infrastructure and
19other costs related to El Centro de
20Oro Market project

 

21Project Allocation

750,000

22(Base Project Allocation - $750,000)

 

23(JJJ) Acquisition, infrastructure,
24construction, redevelopment and other
25related costs for Nueva Esperanza
26North 5th Street redevelopment

 

27Project Allocation

3,000,000

28(Base Project Allocation - $3,000,000)

 

29(KKK) Acquisition, infrastructure,
30demolition, construction,

 

1redevelopment and other related costs
2for Nueva Esperanza commercial/retail
3business redevelopment project

 

4Project Allocation

3,000,000

5(Base Project Allocation - $3,000,000)

 

6(LLL) Construction, infrastructure and
7other costs related to revitalization
8of 1711 West Allegheny Avenue

 

9Project Allocation

500,000

10(Base Project Allocation - $500,000)

 

11(MMM) Acquisition, infrastructure,
12demolition, construction,
13redevelopment and other related costs
14for Plaza Allegheny mixed-use
15commercial retail shopping center in
16Fairhill

 

17Project Allocation

4,000,000

18(Base Project Allocation - $4,000,000)

 

19(NNN) Construction, infrastructure and
20other development costs for emergency,
21inpatient, outpatient and clinical
22facilities for Temple University
23Hospital

 

24Project Allocation

10,000,000

25(Base Project Allocation -
26$10,000,000)

 

27(OOO) Construction, infrastructure and
28other costs related to University of
29Pennsylvania South Bank commercial
30office and research park redevelopment

 

1project

 

2Project Allocation

2,300,000

3(Base Project Allocation - $2,300,000)

 

4(PPP) Construction, infrastructure and
5other costs related to renovation and
6improvement of North City Congress
7Senior Community Center

 

8Project Allocation

1,000,000

9(Base Project Allocation - $1,000,000)

 

10(QQQ) Acquisition, construction,
11infrastructure and other costs related
12to North City Congress Community
13Center facility project

 

14Project Allocation

3,000,000

15(Base Project Allocation - $3,000,000)

 

16(RRR) Construction, infrastructure and
17other costs related to Smith Memorial
18Playhouse Restoration IV and Gateway
19Project

 

20Project Allocation

5,000,000

21(Base Project Allocation - $5,000,000)

 

22(SSS) Acquisition, construction,
23infrastructure and other costs related
24to Chariot Landing-International Row
25mixed-use revitalization project

 

26Project Allocation

40,000,000

27(Base Project Allocation -
28$40,000,000)

 

29(TTT) Acquisition, construction,
30infrastructure and development of

 

1mixed-use Civil Justice Center campus,
2including commercial office space for
3leading legal service organizations

 

4Project Allocation

6,000,000

5(Base Project Allocation - $6,000,000)

 

6(UUU) Acquisition, construction,
7infrastructure, redevelopment and
8other related costs for facilities to
9deliver medical services, conduct
10research or provide other related
11activities for Magee Rehabilitation
12Hospital

 

13Project Allocation

15,000,000

14(Base Project Allocation -
15$15,000,000)

 

16(VVV) Construction, infrastructure and
17other costs related to FDR Park
18Boathouse Cescaphe Ballroom adaptive
19reuse project

 

20Project Allocation

750,000

21(Base Project Allocation - $750,000)

 

22(WWW) Construction, infrastructure and
23other costs related to Old City
24District streetscape improvement
25project

 

26Project Allocation

500,000

27(Base Project Allocation - $500,000)

 

28(XXX) Acquisition, construction,
29infrastructure, redevelopment and
30other related costs for 1010 Avenue of

 

1the Arts New Headquarters Campus/Civic
2Culture Hub

 

3Project Allocation

8,000,000

4(Base Project Allocation - $8,000,000)

 

5(YYY) Construction, infrastructure and
6other costs related to WHYY facilities
7upgrade project

 

8Project Allocation

500,000

9(Base Project Allocation - $500,000)

 

10(ZZZ) Acquisition, construction,
11infrastructure, redevelopment and
12other related costs for Friends Select
13School renovation project

 

14Project Allocation

2,000,000

15(Base Project Allocation - $2,000,000)

 

16(AAAA) Construction, site preparation,
17expansion and infrastructure-related
18costs and construction of Chestnut
19Hill College campus academic center
20facility

 

21Project Allocation

10,000,000

22(Base Project Allocation -
23$10,000,000)

 

24(BBBB) Construction, infrastructure,
25renovations and other costs for
26National Constitution Center

 

27Project Allocation

30,000,000

28(Base Project Allocation -
29$30,000,000)

 

30(CCCC) Construction, infrastructure,

 

1renovations and other costs for museum
2administration building at Eastern
3State Penitentiary Historic Site

 

4Project Allocation

6,500,000

5(Base Project Allocation - $6,500,000)

 

6(DDDD) Construction, infrastructure,
7renovations and other costs for
8interior and exterior improvements at
9Eastern State Penitentiary Historic
10Site

 

11Project Allocation

3,100,000

12(Base Project Allocation - $3,100,000)

 

13(EEEE) Acquisition, construction,
14infrastructure, redevelopment and
15other related costs for 900 North
16Broad Street project

 

17Project Allocation

4,500,000

18(Base Project Allocation - $4,500,000)

 

19(FFFF) Acquisition, construction,
20infrastructure and other related costs
21for Divine Lorraine property
22redevelopment project

 

23Project Allocation

7,500,000

24(Base Project Allocation - $7,500,000)

 

25(GGGG) Acquisition, construction,
26infrastructure and other related costs
27for redevelopment of Stutz property at
28666-667 North Broad Street, 1360-64
29Ridge Avenue and 1319 Wallace Street

 

30Project Allocation

5,000,000

1(Base Project Allocation - $5,000,000)

 

2(HHHH) Acquisition, construction,
3infrastructure and other related costs
4for redevelopment of Stevens property
5at 523 North Broad Street

 

6Project Allocation

6,000,000

7(Base Project Allocation - $6,000,000)

 

8(IIII) Acquisition, construction,
9infrastructure and other related costs
10for redevelopment of Metropolitan
11Opera House

 

12Project Allocation

3,000,000

13(Base Project Allocation - $3,000,000)

 

14(JJJJ) Acquisition, construction,
15infrastructure and other related costs
16for redevelopment of Benjamin Franklin
17High School property

 

18Project Allocation

12,000,000

19(Base Project Allocation -
20$12,000,000)

 

21(KKKK) Acquisition, construction,
22infrastructure and other related costs
23for redevelopment of Parkway Center
24City High School property

 

25Project Allocation

6,000,000

26(Base Project Allocation - $6,000,000)

 

27(LLLL) Acquisition, construction,
28infrastructure and other related costs
29for redevelopment of Julia R.
30Masterman High School property

 

1Project Allocation

8,000,000

2(Base Project Allocation - $8,000,000)

 

3(MMMM) Acquisition, construction,
4infrastructure and other related costs
5for redevelopment of Franklin Learning
6Center property at 616 North 15th
7Street

 

8Project Allocation

7,500,000

9(Base Project Allocation - $7,500,000)

 

10(NNNN) Acquisition, construction,
11infrastructure and other related costs
12for redevelopment of William Penn High
13School property at 1333 North Broad
14Street

 

15Project Allocation

20,000,000

16(Base Project Allocation -
17$20,000,000)

 

18(OOOO) Acquisition, construction,
19infrastructure and other related costs
20for redevelopment of North Broad
21Street Salvation Army property at 701
22North Broad Street

 

23Project Allocation

10,000,000

24(Base Project Allocation -
25$10,000,000)

 

26(PPPP) Acquisition, construction,
27infrastructure, redevelopment and
28other costs related to Greene Street
29Friends School expansion project

 

30Project Allocation

2,000,000

1(Base Project Allocation - $2,000,000)

 

2(QQQQ) Construction, infrastructure and
3other costs related to the renovation
4of SHARE Food Program facility

 

5Project Allocation

2,000,000

6(Base Project Allocation - $2,000,000)

 

7(RRRR) Construction, infrastructure and
8other costs related to the SoKo site
9in Old Kensington/Northern Liberties
10neighborhood

 

11Project Allocation

4,500,000

12(Base Project Allocation - $4,500,000)

 

13(SSSS) Acquisition, infrastructure,
14construction and other related costs
15for 30 University Place project

 

16Project Allocation

6,500,000

17(Base Project Allocation - $6,500,000)

 

18(TTTT) Acquisition, infrastructure,
19construction, redevelopment and other
20related costs for Public Health
21Management Corporation

 

22Project Allocation

10,000,000

23(Base Project Allocation -
24$10,000,000)

 

25(UUUU) Acquisition, infrastructure,
26construction, redevelopment and other
27related costs for St. Francis Villa
28housing project

 

29Project Allocation

1,000,000

30(Base Project Allocation - $1,000,000)

 

1(VVVV) Construction, infrastructure and
2other related costs for the renovation
3and modernization of the Center in the
4Park senior community center Internet
5cafe project

 

6Project Allocation

250,000

7(Base Project Allocation - $250,000)

 

8(WWWW) Construction, renovation,
9infrastructure and other related costs
10for the Kimmel Center for the
11Performing Arts

 

12Project Allocation

10,000,000

13(Base Project Allocation -
14$10,000,000)

 

15(XXXX) Acquisition, construction,
16infrastructure improvements and other
17related costs for the renovation of
18the Mazzoni Center Facility and
19Medical Practice

 

20Project Allocation

6,000,000

21(Base Project Allocation - $6,000,000)

 

22(YYYY) Acquisition, construction,
23infrastructure improvements and other
24related costs for the redevelopment of
25an existing warehouse facility at the
26intersection of Tulip and Harbison
27Streets in Wissinoming

 

28Project Allocation

5,000,000

29(Base Project Allocation - $5,000,000)

 

30(ZZZZ) Construction of the Chinatown

 

1Community Center and acquisition,
2infrastructure improvements and
3renovation of the Chinatown retail
4area

 

5Project Allocation

5,000,000

6(Base Project Allocation - $5,000,000)

 

7(A5) Construction, renovation,
8infrastructure and other related costs
9for the West Philadelphia Branch YMCA
10Wellness/Fitness Center and family
11changing area expansion

 

12Project Allocation

2,000,000

13(Base Project Allocation - $2,000,000)

 

14(B5) Construction, renovation,
15infrastructure and other related costs
16for the Park Towne Place redevelopment
17project

 

18Project Allocation

5,000,000

19(Base Project Allocation - $5,000,000)

 

20(C5) Construction, rehabilitation,
21infrastructure and other related costs
22for the Historical Society of
23Pennsylvania's Center for History and
24Learning Phase II retrofitting and
25renovation project

 

26Project Allocation

2,500,000

27(Base Project Allocation - $2,500,000)

 

28(D5) Construction, rehabilitation,
29infrastructure and other related costs
30for the Historical Society of

 

1Pennsylvania's Center for History and
2Learning Phase II renovation and space
3addition project

 

4Project Allocation

13,500,000

5(Base Project Allocation -
6$13,500,000)

 

7(E5) Construction, infrastructure and
8other related costs for the 4.0
9University Place project

 

10Project Allocation

20,000,000

11(Base Project Allocation -
12$20,000,000)

 

13(F5) Construction and infrastructure
14improvements for Goodwill Industries
15store and training center at 5050
16Parkside Avenue

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(G5) Construction, renovation and
20infrastructure improvements for Nueva
21Esperanza Facilities

 

22Project Allocation

4,800,000

23(Base Project Allocation - $4,800,000)

 

24(H5) Acquisition, construction,
25infrastructure improvements and other
26costs related to the 52nd Street
27Gateway Phase I mixed-use building
28project

 

29Project Allocation

1,000,000

30(Base Project Allocation - $1,000,000)

 

1(I5) Acquisition, construction,
2infrastructure improvements and other
3costs related to the 52nd Street
4Gateway Phase II Lifelong Learning
5Center project

 

6Project Allocation

1,300,000

7(Base Project Allocation - $1,300,000)

 

8(J5) Acquisition, construction,
9infrastructure improvements and other
10costs related to the 52nd Street
11Gateway Phase III transit center
12project

 

13Project Allocation

3,700,000

14(Base Project Allocation - $3,700,000)

 

15(K5) Acquisition, construction,
16infrastructure improvements and other
17related costs for 52nd Street mixed-
18use development project

 

19Project Allocation

10,000,000

20(Base Project Allocation -
21$10,000,000)

 

22(L5) Acquisition, construction,
23infrastructure improvements and other
24related costs for Inglis housing and
25long-term care facility development
26project

 

27Project Allocation

10,000,000

28(Base Project Allocation -
29$10,000,000)

 

30(M5) Acquisition, construction,

 

1infrastructure improvements and other
2related costs for Strawberry Mansion
3housing development project

 

4Project Allocation

10,000,000

5(Base Project Allocation -
6$10,000,000)

 

7(N5) Construction, infrastructure
8improvements and related costs for the
9Ligouri Academy renovation project

 

10Project Allocation

2,000,000

11(Base Project Allocation - $2,000,000)

 

12(O5) Construction, infrastructure
13improvements and related costs for the
14Brown's Superstores redevelopment
15project at North Broad and Spring
16Garden Streets

 

17Project Allocation

8,000,000

18(Base Project Allocation - $8,000,000)

 

19(P5) Construction, infrastructure
20improvements and related costs for the
21Brown's redevelopment project at 70th
22and Elmwood

 

23Project Allocation

12,000,000

24(Base Project Allocation -
25$12,000,000)

 

26(Q5) Construction, infrastructure
27improvements and related costs for the
28Brown's Superstores redevelopment
29project at the 24th and Oregon
30Shopping Center

 

1Project Allocation

8,000,000

2(Base Project Allocation - $8,000,000)

 

3(R5) Construction, infrastructure
4improvements and related costs for the
5Brown's Superstores redevelopment
6project at the PriceRite of Erie
7Avenue shopping center

 

8Project Allocation

5,000,000

9(Base Project Allocation - $5,000,000)

 

10(S5) Construction, infrastructure
11improvements and related costs for the
12Brown's Superstores redevelopment
13project at the PriceRite of Mantua
14shopping center

 

15Project Allocation

4,000,000

16(Base Project Allocation - $4,000,000)

 

17(T5) Acquisition, demolition,
18construction, renovation,
19infrastructure and other related costs
20for Thomas Jefferson University
21projects

 

22Project Allocation

25,000,000

23(Base Project Allocation -
24$25,000,000)

 

25(U5) Acquisition, infrastructure and
26other capital improvements for the
27Wordsworth Ford Road project

 

28Project Allocation

2,500,000

29(Base Project Allocation - $2,500,000)

 

<-30(V5) Construction, infrastructure and

 

1other related costs for expansion
2project at Philadelphia Freedom Valley
3YMCA West Philadelphia branch

 

4Project Allocation

2,000,000

5(Base Project Allocation - $2,000,000)

 

6(W5) Construction, infrastructure and
7other related costs for development of
8multiuse facility for Temple
9University athletics, academics and
10research and local community athletic
11events

 

12Project Allocation

30,000,000

13(Base Project Allocation -
14$30,000,000)

 

15(X5) Acquisition, construction,
16infrastructure, redevelopment and
17other related costs for redevelopment
18project at Island Avenue and Bartram
19Avenue

 

20Project Allocation

4,000,000

21(Base Project Allocation - $4,000,000)

 

22(Y5) Acquisition, construction,
23infrastructure, redevelopment,
24abatement of hazardous materials and
25other related costs for Gateway
26Marriott Hotel and related amenities
27in the vicinity of Island Avenue and
28Bartram Avenue intersection

 

29Project Allocation

4,000,000

30(Base Project Allocation - $4,000,000)

 

1(Z5) Acquisition, construction,
2infrastructure, redevelopment,
3abatement of hazardous materials and
4other related costs for 52nd Street
5Gateway Phase I project

 

6Project Allocation

1,000,000

7(Base Project Allocation - $1,000,000)

 

8(A6) Acquisition, construction,
9infrastructure, redevelopment,
10abatement of hazardous materials and
11other related costs for 52nd Street
12Gateway Phase II project

 

13Project Allocation

1,300,000

14(Base Project Allocation - $1,300,000)

 

15(B6) Acquisition, construction,
16infrastructure, redevelopment,
17abatement of hazardous materials and
18other related costs for 52nd Street
19Gateway Phase III project

 

20Project Allocation

3,700,000

21(Base Project Allocation - $3,700,000)

 

22(C6) Acquisition, construction,
23redevelopment and other related costs
24for projects as 900 North Broad Street

 

25Project Allocation

4,500,000

26(Base Project Allocation - $4,500,000)

 

27(D6) Construction, infrastructure,
28redevelopment and other related costs
29for ASPIRA school expansion projects

 

30Project Allocation

5,000,000

1(Base Project Allocation - $5,000,000)

 

2(E6) Construction and other related costs
3for community center on Old York Road

 

4Project Allocation

500,000

5(Base Project Allocation - $500,000)

 

6(F6) Acquisition, construction,
7redevelopment and other related costs
8for projects at site of Benjamin
9Franklin High School

 

10Project Allocation

12,000,000

11(Base Project Allocation -
12$12,000,000)

 

13(G6) Construction, infrastructure,
14redevelopment, abatement of hazardous
15materials and other related costs for
16site of Beury Building on North Broad
17Street

 

18Project Allocation

6,000,000

19(Base Project Allocation - $6,000,000)

 

20(H6) Acquisition, construction,
21infrastructure, redevelopment,
22abatement of hazardous materials and
23other related costs for Building 16
24project at former Philadelphia Naval
25Yard

 

26Project Allocation

20,000,000

27(Base Project Allocation -
28$20,000,000)

 

29(I6) Acquisition, construction,
30infrastructure, redevelopment,

 

1abatement of hazardous materials and
2other related costs for Building 18
3project at former Philadelphia Naval
4Yard

 

5Project Allocation

20,000,000

6(Base Project Allocation -
7$20,000,000)

 

8(J6) Construction, infrastructure,
9redevelopment and other related costs
10for Bustleton Bengals gymnasium
11project

 

12Project Allocation

300,000

13(Base Project Allocation - $300,000)

 

14(K6) Construction, redevelopment and
15other related costs for community
16center in Bustleton section of the
17city

 

18Project Allocation

1,300,000

19(Base Project Allocation - $1,300,000)

 

20(L6) Acquisition, construction,
21redevelopment and other related costs
22for medical rehabilitation facility,
23including ground level rental spaces,
24in Grays Ferry section of the city

 

25Project Allocation

8,500,000

26(Base Project Allocation - $8,500,000)

 

27(M6) Construction and other related costs
28for 52nd Street commercial corridor
29redevelopment

 

30Project Allocation

1,000,000

1(Base Project Allocation - $1,000,000)

 

2(N6) Acquisition, redevelopment and other
3related costs for Charles M. Wingfield
4Community Center

 

5Project Allocation

500,000

6(Base Project Allocation - $500,000)

 

7(O6) Acquisition, construction and other
8related costs for children's learning
9center

 

10Project Allocation

1,000,000

11(Base Project Allocation - $1,000,000)

 

12(P6) Acquisition, construction,
13infrastructure, redevelopment and
14other related costs for projects
15related to Cristo Rey Philadelphia
16High School

 

17Project Allocation

3,000,000

18(Base Project Allocation - $3,000,000)

 

19(Q6) Acquisition, construction,
20redevelopment and other related costs
21for Divine Lorraine property

 

22Project Allocation

7,500,000

23(Base Project Allocation - $7,500,000)

 

24(R6) Construction, infrastructure and
25other related costs for streetscape
26improvements in East Falls Riverfront
27Business District

 

28Project Allocation

2,500,000

29(Base Project Allocation - $2,500,000)

 

30(S6) Construction, infrastructure,

 

1redevelopment and other related costs
2for outpatient center

 

3Project Allocation

7,500,000

4(Base Project Allocation - $7,500,000)

 

5(T6) Acquisition, construction,
6infrastructure, redevelopment and
7other related costs for supermarket
8project on West Erie Avenue

 

9Project Allocation

4,375,000

10(Base Project Allocation - $4,375,000)

 

11(U6) Acquisition, construction,
12infrastructure, redevelopment and
13other related costs for supermarket
14project on West Erie Avenue

 

15Project Allocation

4,375,000

16(Base Project Allocation - $4,375,000)

 

17(V6) Acquisition, construction,
18infrastructure, redevelopment,
19abatement of hazardous materials and
20other related costs for community
21center

 

22Project Allocation

1,500,000

23(Base Project Allocation - $1,500,000)

 

24(W6) Acquisition, construction,
25redevelopment and other related costs
26for projects relating to Franklin
27Learning Center

 

28Project Allocation

7,500,000

29(Base Project Allocation - $7,500,000)

 

30(X6) Acquisition, construction,

 

1infrastructure, redevelopment and
2other related costs for projects
3relating to George Institute

 

4Project Allocation

2,500,000

5(Base Project Allocation - $2,500,000)

 

6(Y6) Acquisition, construction,
7infrastructure and other related costs
8for Friends Housing Cooperative, Inc.,
9projects

 

10Project Allocation

7,467,000

11(Base Project Allocation - $7,467,000)

 

12(Z6) Acquisition, construction,
13redevelopment and other related costs
14for rehabilitation of building for use
15as family and health care facility

 

16Project Allocation

1,925,000

17(Base Project Allocation - $1,925,000)

 

18(A7) Acquisition, construction and other
19related costs for Green Tree School
20project

 

21Project Allocation

1,000,000

22(Base Project Allocation - $1,000,000)

 

23(B7) Acquisition, construction,
24redevelopment and other related costs
25for affordable housing and retail
26development facility

 

27Project Allocation

3,000,000

28(Base Project Allocation - $3,000,000)

 

29(C7) Construction, redevelopment and
30other related costs for Hunting Park

 

1revitalization project

 

2Project Allocation

1,300,000

3(Base Project Allocation - $1,300,000)

 

4(D7) Acquisition, construction,
5redevelopment and other related costs
6for development of housing and
7supportive services infrastructure for
8special needs populations

 

9Project Allocation

3,000,000

10(Base Project Allocation - $3,000,000)

 

11(E7) Construction, infrastructure,
12redevelopment and other related costs
13for inpatient, outpatient, emergency
14and clinical facilities

 

15Project Allocation

5,000,000

16(Base Project Allocation - $5,000,000)

 

17(F7) Acquisition, construction,
18redevelopment and other related costs
19for projects at site of Julia R.
20Masterman High School

 

21Project Allocation

8,000,000

22(Base Project Allocation - $8,000,000)

 

23(G7) Acquisition, construction,
24redevelopment and other related costs
25for Lehigh Somerset neighborhood
26revitalization

 

27Project Allocation

5,000,000

28(Base Project Allocation - $5,000,000)

 

29(H7) Acquisition, construction,
30infrastructure, redevelopment and

 

1other related costs for projects
2relating to Mazzoni Center

 

3Project Allocation

6,000,000

4(Base Project Allocation - $6,000,000)

 

5(I7) Acquisition, construction,
6redevelopment and other related costs
7for Metropolitan Opera House

 

8Project Allocation

3,000,000

9(Base Project Allocation - $3,000,000)

 

10(J7) Construction and other related costs
11for multipurpose community facility

 

12Project Allocation

550,000

13(Base Project Allocation - $550,000)

 

14(K7) Acquisition, construction,
15redevelopment and other related costs
16for project at site of North Broad
17Salvation Army

 

18Project Allocation

10,000,000

19(Base Project Allocation -
20$10,000,000)

 

21(L7) Construction, infrastructure,
22redevelopment and other related costs
23for transit center project in north
24Philadelphia

 

25Project Allocation

20,000,000

26(Base Project Allocation -
27$20,000,000)

 

28(M7) Acquisition, construction,
29infrastructure, redevelopment and
30other related costs for revitalization

 

1projects in northwest Philadelphia

 

2Project Allocation

5,000,000

3(Base Project Allocation - $5,000,000)

 

4(N7) Acquisition, construction,
5redevelopment and other related costs
6for project at site of Parkway Center
7City High School

 

8Project Allocation

6,000,000

9(Base Project Allocation - $6,000,000)

 

10(O7) Construction, infrastructure,
11redevelopment and other related costs
12for projects at Philadelphia Zoo

 

13Project Allocation

30,000,000

14(Base Project Allocation -
15$30,000,000)

 

16(P7) Acquisition, construction and other
17related costs for Philly Fundamentals
18project

 

19Project Allocation

700,000

20(Base Project Allocation - $700,000)

 

21(Q7) Infrastructure, redevelopment and
22other related costs for renovations to
23Pyramid Temple No. 1, including
24elevator replacement

 

25Project Allocation

500,000

26(Base Project Allocation - $500,000)

 

27(R7) Acquisition, construction,
28infrastructure, redevelopment and
29other related costs for Richard Allen
30Preparatory School expansion project

 

1Project Allocation

5,000,000

2(Base Project Allocation - $5,000,000)

 

3(S7) Acquisition, construction,
4infrastructure, redevelopment and
5other related costs for economic
6development projects in Roxborough
7District

 

8Project Allocation

500,000

9(Base Project Allocation - $500,000)

 

10(T7) Construction, redevelopment,
11abatement of hazardous materials and
12other related costs for the Self Help
13Movement restoration and
14beautification project

 

15Project Allocation

750,000

16(Base Project Allocation - $750,000)

 

17(U7) Construction, redevelopment and
18other related costs for health center
19facility

 

20Project Allocation

300,000

21(Base Project Allocation - $300,000)

 

22(V7) Acquisition, construction,
23redevelopment and other related costs
24for Stevens property on North Broad
25Street

 

26Project Allocation

6,000,000

27(Base Project Allocation - $6,000,000)

 

28(W7) Acquisition, construction,
29redevelopment and other related costs
30for projects at Stutz property

 

1Project Allocation

5,000,000

2(Base Project Allocation - $5,000,000)

 

3(X7) Acquisition, infrastructure
4improvements and construction for
5Taller Puertorriqueno, Inc., expansion
6project

 

7Project Allocation

2,000,000

8(Base Project Allocation - $2,000,000)

 

9(Y7) Construction, infrastructure,
10redevelopment and other related costs
11for research and clinical care
12facilities

 

13Project Allocation

5,000,000

14(Base Project Allocation - $5,000,000)

 

15(Z7) Acquisition, construction and other
16related costs for University of the
17Sciences

 

18Project Allocation

25,000,000

19(Base Project Allocation -
20$25,000,000)

 

21(A8) Construction and other related costs
22for Upsala Renewal project

 

23Project Allocation

750,000

24(Base Project Allocation - $750,000)

 

25(B8) Construction, infrastructure and
26other related costs for redevelopment
27of vacant building on Duval Steet

 

28Project Allocation

500,000

29(Base Project Allocation - $500,000)

 

30(C8) Acquisition, construction and other

 

1related costs for community center

 

2Project Allocation

1,000,000

3(Base Project Allocation - $1,000,000)

 

4(D8) Construction, infrastructure and
5other related costs for projects for
6Philadelphia Freedom Valley YMCA West
7Philadelphia branch

 

8Project Allocation

2,000,000

9(Base Project Allocation - $2,000,000)

 

10(E8) Acquisition, construction,
11redevelopment and other related costs
12for projects at site of William Penn
13High School

 

14Project Allocation

20,000,000

15(Base Project Allocation -
16$20,000,000)

 

17(F8) Construction, infrastructure,
18redevelopment and other related costs
19for development of properties in west
20Philadelphia

 

21Project Allocation

2,000,000

22(Base Project Allocation - $2,000,000)

 

23(G8) Acquisition, infrastructure,
24construction, redevelopment, abatement
25of hazardous materials and other
26related costs for commercial and
27mixed-use property development of
28vacant properties in Wynnefield

 

29Project Allocation

10,000,000

30(Base Project Allocation -

 

1$10,000,000)

 

2(H8) Acquisition, construction,
3redevelopment and other related costs
4for YESHA Family Care Center

 

5Project Allocation

2,000,000

6(Base Project Allocation - $2,000,000)

 

7(I8) Construction, acquisition,
8infrastructure and related costs for
9the expansion and redevelopment of The
10Center for Autism

 

11Project Allocation

10,000,000

12(Base Project Allocation -
13$10,000,000)

 

14(J8) Construction, abatement of hazardous
15materials and other related costs to
16renovate the historic Carpenter Shop
17on the campus of the Friends Hospital
18to become a community center

 

19Project Allocation

500,000

20(Base Project Allocation - $500,000)

 

<-21(K8) Acquisition, construction,
22infrastructure and other related costs
23for multistory facility spanning Cecil
24B. Moore Avenue and Oxford Street
25along Broad Street

 

26Project Allocation

25,000,000

27(Base Project Allocation -
28$25,000,000)

 

29(L8) Acquisition, construction and other
30related costs for CORD Advanced

 

1Manufacturing Training Center projects

 

2Project Allocation

2,373,000

3(Base Project Allocation - $2,373,000)

 

4(M8) Construction, infrastructure,
5redevelopment and other related costs
6to rehabilitate a historically
7certified former grain silo building
8known as the Granary

 

<-9Project Allocation

2,000,000

10(Base Project Allocation - $2,000,000)

 

<-11Project Allocation

4,000,000

12(Base Project Allocation - $4,000,000)

 

13(N8) Construction, infrastructure,
14redevelopment, abatement of hazardous
15materials and other related costs for
16Independence Seaport Museum at Penn's
17Landing

 

18Project Allocation

8,000,000

19(Base Project Allocation - $8,000,000)

 

20(O8) Construction, infrastructure,
21redevelopment, abatement of hazardous
22materials and other related costs for
23preschool project at site of Mill
24Creek Community and Cultural Center

 

25Project Allocation

1,000,000

26(Base Project Allocation - $1,000,000)

 

27(P8) Construction and other related costs
28for Christy Recreation Center
29improvement project

 

30Project Allocation

1,000,000

1(Base Project Allocation - $1,000,000)

 

<-2(Q8) Construction, infrastructure and
3other costs related to the Core
4Project of the Philadelphia Museum of
5Art

 

6Project Allocation

15,000,000

7(Base Project Allocation -
8$15,000,000)

 

9(R8) Construction, infrastructure,
10redevelopment and other related costs
11for Broad Street Ministry's
12improvements to the historic building
13along Avenue of the Arts

 

14Project Allocation

4,000,000

15(Base Project Allocation - $4,000,000)

 

16(S8) Acquisition, construction,
17infrastructure, redevelopment and
18other related costs for the relocation
19and expansion of the Council of
20Spanish Speaking Organizations, Inc.

 

21Project Allocation

4,000,000

22(Base Project Allocation - $4,000,000)

 

23(T8) Construction, infrastructure and
24other related costs for new University
25City Commercial Health Care Innovation
26Center building

 

27Project Allocation

6,000,000

28(Base Project Allocation - $6,000,000)

 

29(U8) Raymond & Miriam Klein JCC, design,
30infrastructure, construction and other

 

1related costs, including alternative
2energy projects, for new and existing
3buildings and facilities

 

4Project Allocation

1,500,000

5(Base Project Allocation - $1,500,000)

 

6(V8) Construction, infrastructure,
7redevelopment and other related costs
8for Museum of Sports

 

9Project Allocation

1,200,000

10(Base Project Allocation - $1,200,000)

 

11(52) Pike County

 

12(i) (Reserved)

 

13(53) Potter County

 

14(i) County projects

 

15(A) Acquisition, infrastructure,
16construction and other related costs
17for economic project

 

18Project Allocation

10,000,000

19(Base Project Allocation -
20$10,000,000)

 

21(54) Schuylkill County

 

22(i) Schuylkill Economic Development
23Corporation

 

24(A) Acquisition, infrastructure,
25construction, utilities extensions and
26roadway improvements for development
27of Schuylkill Airport Business Park in
28Foster Township

 

29Project Allocation

2,500,000

30(Base Project Allocation - $2,500,000)

 

1(B) Acquisition, infrastructure,
2construction and utilities extensions
3for expansion of Deer Lake Industrial
4Park

 

5Project Allocation

1,000,000

6(Base Project Allocation - $1,000,000)

 

7(C) Construction of industrial shell
8building at Tidewood Industrial Park

 

9Project Allocation

1,375,000

10(Base Project Allocation - $1,375,000)

 

11(D) Acquisition, infrastructure,
12construction and other related costs
13for rehabilitation of St. Catherine's
14Medical Complex located in Butler
15Township and retrofitting it into a
16multipurpose facility

 

17Project Allocation

2,000,000

18(Base Project Allocation - $2,000,000)

 

19(E) Construction of commercial and
20industrial buildings at Highridge
21Business Park

 

22Project Allocation

2,500,000

23(Base Project Allocation - $2,500,000)

 

24(F) Construction of industrial shell
25building at Highridge Business Park

 

26Project Allocation

2,925,000

27(Base Project Allocation - $2,925,000)

 

28(G) Acquisition, infrastructure,
29construction and utilities extensions
30for development and construction of

 

1400-acre business park

 

2Project Allocation

3,000,000

3(Base Project Allocation - $3,000,000)

 

4(ii) Coaldale Borough

 

5(A) Acquisition, infrastructure,
6renovation, construction and other
7related costs for development of
8outpatient medical facility and
9dialysis treatment center

 

10Project Allocation

2,500,000

11(Base Project Allocation - $2,500,000)

 

12(B) Infrastructure, rehabilitation,
13construction and other related costs
14for expansion of St. Luke's Miners
15Hospital

 

16Project Allocation

10,000,000

17(Base Project Allocation -
18$10,000,000)

 

19(iii) Mahanoy City Borough

 

20(A) Acquisition, infrastructure,
21renovation, construction and other
22related costs for development of new
23outpatient medical office building

 

24Project Allocation

1,500,000

25(Base Project Allocation - $1,500,000)

 

<-26(iii.1) City of Pottsville

 

27(A) Infrastructure, construction and
28other related costs for infrastructure
29improvements to Schuylkill Health
30System facilities

 

1Project Allocation

2,000,000

2(Base Project Allocation - $2,000,000)

 

3(iv) Tamaqua Borough

 

4(A) Acquisition, infrastructure,
5renovation, construction and other
6related costs for development of
7facility to house state-of-the-art
8police station, antiblight education
9center, emergency center and
10magisterial district court

 

11Project Allocation

2,000,000

12(Base Project Allocation - $2,000,000)

 

13(B) Acquisition, infrastructure,
14renovation, construction and other
15related costs for new state-of-the-art
16public library, to be constructed in
17downtown historic district

 

18Project Allocation

2,500,000

19(Base Project Allocation - $2,500,000)

 

20(C) Acquisition, infrastructure,
21renovation, construction and other
22related costs for redevelopment of
23downtown business district

 

24Project Allocation

4,000,000

25(Base Project Allocation - $4,000,000)

 

26(D) Acquisition, infrastructure,
27renovation, construction, utilities
28extensions and other related costs for
29construction of high-tech industrial
30community park on east end of borough

 

1along Route 209

 

2Project Allocation

5,000,000

3(Base Project Allocation - $5,000,000)

 

4(55) Snyder County

 

5(i) (Reserved)

 

6(ii) Shamokin Dam Borough <-and Monroe Township

 

7(A) Construction, infrastructure,
8redevelopment and other related costs
9for conversion of coal-fired power
10plant to natural gas-fired combined-
11cycle power plant

 

12Project Allocation

80,000,000

13(Base Project Allocation -
14$80,000,000)

 

15(56) Somerset County

 

16(i) County Projects

 

17(A) Land acquisition, construction,
18infrastructure and related costs for
19the expansion of Riggs Industries and
20its subsidiaries

 

21Project Allocation

10,000,000

22(Base Project Allocation -
23$10,000,000)

 

<-24(B) Acquisition, construction,
25infrastructure and other related costs
26for ambulatory care center

 

27Project Allocation

5,000,000

28(Base Project Allocation - $5,000,000)

 

29(C) Acquisition, construction,
30infrastructure and other related costs

 

1for outdoor recreational tourism
2facility and related projects

 

3Project Allocation

1,000,000

4(Base Project Allocation - $1,000,000)

 

5(D) Acquisition, construction,
6infrastructure and other related costs
7for natural gas refueling station

 

8Project Allocation

1,000,000

9(Base Project Allocation - $1,000,000)

 

<-10(E) Acquisition, construction,
11infrastructure and other related costs
12for expansion of oil and gas
13wastewater treatment facility

 

14Project Allocation

50,000,000

15(Base Project Allocation -
16$50,000,000)

 

17(i.1) Quemahoning Township

 

18(A) Construction, infrastructure and
19other related costs for rail projects
20relating to economic development
21projects

 

22Project Allocation

2,000,000

23(Base Project Allocation - $2,000,000)

 

24(i.2) Shade Township

 

25(A) Acquisition, construction,
26infrastructure and other related costs
27for rail siding and transloading
28facility

 

29Project Allocation

2,100,000

30(Base Project Allocation - $2,100,000)

 

1(ii) Somerset Borough

 

2(A) Construction, infrastructure and
3other costs related to Somerset
4Hospital campus improvement project

 

5Project Allocation

4,000,000

6(Base Project Allocation - $4,000,000)

 

7(iii) Somerset Township

 

8(A) Construction, infrastructure and
9other costs related to Twin Lakes
10Rehabilitation Center project

 

11Project Allocation

500,000

12(Base Project Allocation - $500,000)

 

<-13(iv) Windber Borough

 

14(A) Acquisition, construction,
15infrastructure, redevelopment,
16abatement of hazardous materials and
17other related costs for educational
18facility projects relating to Windber
19Coal Heritage Museum

 

20Project Allocation

1,000,000

21(Base Project Allocation - $1,000,000)

 

22(57) Sullivan County

 

23(i) (Reserved)

 

<-24(ii) Laporte Borough

 

25(A) Infrastructure, redevelopment and
26other related costs for upgrades to
27medical equipment and services for
28rural health clinic

 

29Project Allocation

1,000,000

30(Base Project Allocation - $1,000,000)

 

1(58) Susquehanna County

 

2(i) The Progress Authority

 

3(A) Infrastructure improvements,
4renovations, construction and other
5related costs for improvements to Camp
6Archbald

 

7Project Allocation

1,000,000

8(Base Project Allocation - $1,000,000)

 

<-9(ii) Central Bradford Industrial Development
10Authority

 

11(A) Construction, acquisition,
12infrastructure, redevelopment and
13other related costs for a business
14park along the I-81 corridor

 

15Project Allocation

2,000,000

16(Base Project Allocation - $2,000,000)

 

17(iii) Bridgewater Township

 

18(A) Construction, infrastructure and
19other related costs for an extension
20of a public waterline

 

21Project Allocation

500,000

22(Base Project Allocation - $500,000)

 

<-23(iv) Montrose Borough

 

24(A) Construction, infrastructure and
25other related costs for an outpatient
26rehabilitation department, infusion
27therapy, cardiopulmonary and
28administrative and business offices to
29the hospital campus for Endless
30Mountains Health Systems

 

1Project Allocation

5,000,000

2(Base Project Allocation - $5,000,000)

 

3(59) Tioga County

 

4(i) County projects

 

5(A) Acquisition, infrastructure,
6construction and other related costs
7for economic project

 

8Project Allocation

10,000,000

9(Base Project Allocation -
10$10,000,000)

 

11(B) Infrastructure, renovation,
12construction and other related costs
13for state-of-the-art cancer center at
14Soldiers and Sailors Memorial Hospital

 

15Project Allocation

2,100,000

16(Base Project Allocation - $2,100,000)

 

17(C) Infrastructure, renovation,
18construction and other related costs
19for a same day surgery unit and state-
20of-the-art emergency department at
21Soldiers and Sailors Memorial Hospital

 

22Project Allocation

18,500,000

23(Base Project Allocation -
24$18,500,000)

 

25(ii) Tioga County Development Corporation

 

26(A) Design, engineering, site
27development, infrastructure,
28demolition, construction and other
29costs related to redevelopment of the
30former E. H. Hall, Inc./WESTAN Tannery

 

1brownfield site into Westfield
2Business Park

 

3Project Allocation

4,600,000

4(Base Project Allocation - $4,600,000)

 

<-5(iii) Wellsboro Borough

 

6(A) Redevelopment, construction and other
7related costs for community athletic
8complex

 

9Project Allocation

3,000,000

10(Base Project Allocation - $3,000,000)

 

11(iv) Wellsboro Borough and Richmond Township

 

12(A) Construction, acquisition, expansion,
13renovation and other related costs for
14Susquehanna Health/Laurel Health
15Entities/North Penn Comprehensive
16Health Services

 

17Project Allocation

15,000,000

18(Base Project Allocation -
19$15,000,000)

 

20(60) Union County

 

21(i) (Reserved)

 

<-22(ii) Kelly Township

 

23(A) Transportation infrastructure
24improvements associated with expansion
25of Evangelical Community Hospital
26facilities on grounds of existing
27hospital and on adjacent land

 

28Project Allocation

4,100,000

29(Base Project Allocation - $4,100,000)

 

30(61) Venango County

 

1(i) Oil Region Alliance

 

2(A) Acquisition, infrastructure,
3construction and other related costs
4for development of senior living
5multiphase care facility, to include
6independent cottage campus, assisted
7living and nursing home care

 

8Project Allocation

7,000,000

9(Base Project Allocation - $7,000,000)

 

10(62) Warren County

 

11(i) County projects

 

12(A) Acquisition, infrastructure,
13construction and other related costs
14for economic project

 

15Project Allocation

10,000,000

16(Base Project Allocation -
17$10,000,000)

 

18(63) Washington County

 

19(i) County projects

 

20(A) Acquisition, construction,
21infrastructure, redevelopment and
22other costs related to mixed-use
23business park

 

24Project Allocation

2,000,000

25(Base Project Allocation - $2,000,000)

 

26(B) Acquisition, construction,
27infrastructure, redevelopment and
28other costs related to development of
29pad-ready sites along I-79 and Route
3019 corridor

 

1Project Allocation

5,000,000

2(Base Project Allocation - $5,000,000)

 

3(C) Acquisition, construction,
4infrastructure, redevelopment and
5other costs related to economic
6development projects

 

7Project Allocation

10,000,000

8(Base Project Allocation -
9$10,000,000)

 

<-10(D) Acquisition, construction,
11infrastructure and other related costs
12for redevelopment projects relating to
13natural gas industry

 

14Project Allocation

3,000,000

15(Base Project Allocation - $3,000,000)

 

16(E) Acquisition, construction,
17infrastructure and other related costs
18for redevelopment projects relating to
19natural gas industry

 

20Project Allocation

3,000,000

21(Base Project Allocation - $3,000,000)

 

22(F) Construction, infrastructure and
23other related costs for Skypointe
24Business Park project

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(G) Acquisition, construction,
28infrastructure and other related costs
29for development of sites adjacent to
30Washington County Airport

 

1Project Allocation

10,000,000

2(Base Project Allocation -
3$10,000,000)

 

4(H) Construction, rehabilitation and
5other related costs for senior living
6project

 

7Project Allocation

2,050,000

8(Base Project Allocation - $2,050,000)

 

9(I) Construction, infrastructure,
10abatement of hazardous materials and
11other related costs for redevelopment
12and renovation of historical YWCA
13building on West Maiden Street

 

14Project Allocation

3,000,000

15(Base Project Allocation - $3,000,000)

 

16(J) Acquisition, infrastructure and other
17related costs for development of site
18along Route 19 and I-70 corridor

 

19Project Allocation

5,000,000

20(Base Project Allocation - $5,000,000)

 

21(K) Acquisition, construction,
22infrastructure redevelopment and other
23related costs for development of pad-
24ready sites

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(L) Construction, abatement of hazardous
28materials and other related costs for
29redevelopment of former industrial
30sites and brownfields

 

1Project Allocation

5,000,000

2(Base Project Allocation - $5,000,000)

 

3(ii) Allenport Borough

 

4(A) Acquisition, construction,
5infrastructure, redevelopment and
6other costs related to site
7improvement project at Mon River
8Industrial Park

 

9Project Allocation

10,000,000

10(Base Project Allocation -
11$10,000,000)

 

<-12(ii.1) Buffalo Township

 

13(A) Acquisition, construction,
14infrastructure and other related costs
15for mixed-use trail

 

16Project Allocation

500,000

17(Base Project Allocation - $500,000)

 

18(B) Construction, infrastructure and
19other related costs for water line
20installation in Blain and Buffalo
21Townships

 

22Project Allocation

1,000,000

23(Base Project Allocation - $1,000,000)

 

24(ii.2) Burgettstown Borough

 

25(A) Construction, infrastructure and
26other related costs for Starpointe
27Business Park project

 

28Project Allocation

15,000,000

29(Base Project Allocation -
30$15,000,000)

 

1(ii.3) California Borough

 

2(A) Construction, redevelopment and other
3related costs for Center in the Woods
4improvement project

 

5Project Allocation

500,000

6(Base Project Allocation - $500,000)

 

7(ii.1) <-(ii.4) Canonsburg Borough

 

8(A) Acquisition, construction,
9infrastructure improvements and other
10costs related to a Pop Music Hall of
11Fame project

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

<-14(ii.5) Carroll Township

 

15(A) Construction, infrastructure
16redevelopment and other related costs
17for projects at Mon Valley YMCA

 

18Project Allocation

1,000,000

19(Base Project Allocation - $1,000,000)

 

20(B) Acquisition, construction,
21infrastructure and other related costs
22for loadout facility

 

23Project Allocation

4,750,000

24(Base Project Allocation - $4,750,000)

 

25(C) Construction, redevelopment and other
26related costs for Monongahela Valley
27Hospital

 

28Project Allocation

1,000,000

29(Base Project Allocation - $1,000,000)

 

30(ii.6) Cecil Township

 

1(A) Acquisition, construction,
2infrastructure and other related costs
3for park improvements

 

4Project Allocation

1,250,000

5(Base Project Allocation - $1,250,000)

 

6(iii) Hanover Township

 

7(A) Acquisition, construction,
8infrastructure, redevelopment and
9other costs related to Starpointe
10Business Park expansion project

 

11Project Allocation

15,000,000

12(Base Project Allocation -
13$15,000,000)

 

<-14(iii.1) Jefferson Township

 

15(A) Acquisition, construction,
16infrastructure, redevelopment and
17other related costs for projects at
18Meadowcroft Rockshelter and historic
19village

 

20Project Allocation

2,000,000

21(Base Project Allocation - $2,000,000)

 

22(iii.2) City of Monongahela

 

23(A) Acquisition, construction,
24infrastructure, redevelopment,
25abatement of hazardous materials and
26other related costs for projects
27relating to Noble J. Dick Aquatorium

 

28Project Allocation

600,000

29(Base Project Allocation - $600,000)

 

30(iii.3) Peters Township

 

1(A) Construction, infrastructure,
2redevelopment, renovation and other
3related costs for improvements to
4Peterswood Park

 

5Project Allocation

650,000

6(Base Project Allocation - $650,000)

 

7(B) Construction, infrastructure,
8redevelopment, renovation and other
9related costs for Peters Township
10Amphitheater

 

11Project Allocation

500,000

12(Base Project Allocation - $500,000)

 

13(iii.4) South Fayette Township

 

14(A) Acquisition, construction,
15infrastructure and other related costs
16for park improvements

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(B) Construction, infrastructure and
20other related costs for civic center

 

21Project Allocation

4,000,000

22(Base Project Allocation - $4,000,000)

 

23(iv) South Strabane Township

 

24(A) Acquisition, construction,
25infrastructure, redevelopment and
26other costs related to Zediker Station
27Business Park improvement project

 

28Project Allocation

10,000,000

29(Base Project Allocation -
30$10,000,000)

 

1(B) Acquisition, construction,
2infrastructure, redevelopment and
3other costs related to development of
4business park in the township

 

5Project Allocation

10,000,000

6(Base Project Allocation -
7$10,000,000)

 

8(C) Acquisition, construction,
9infrastructure, redevelopment and
10other costs related to locating sites
11for support companies for natural gas
12industry

 

13Project Allocation

3,000,000

14(Base Project Allocation - $3,000,000)

 

15(D) Acquisition, construction,
16infrastructure, redevelopment and
17other costs related to redevelopment
18of former industrial sites for new and
19expanding businesses

 

20Project Allocation

5,000,000

21(Base Project Allocation - $5,000,000)

 

22(E) Acquisition, construction,
23infrastructure, redevelopment and
24other costs related to Mon Valley
25receiving and loading facility
26development project

 

27Project Allocation

5,000,000

28(Base Project Allocation - $5,000,000)

 

29(F) Acquisition, construction,
30infrastructure, redevelopment and

 

1other costs related to development of
2sites adjacent to Washington County
3Airport for aviation-related business
4park

 

5Project Allocation

10,000,000

6(Base Project Allocation -
7$10,000,000)

 

8(G) Acquisition, construction,
9infrastructure, redevelopment and
10other costs related to Skypointe
11business park

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

14(H) Acquisition, infrastructure,
15construction and other related costs
16for former foundry site mixed-use
17redevelopment project

 

18Project Allocation

3,000,000

19(Base Project Allocation - $3,000,000)

 

<-20(I) Acquisition, construction,
21infrastructure, abatement of hazardous
22materials and other related costs for
23redevelopment of former industrial
24sites

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(J) Acquisition, construction,
28infrastructure, redevelopment and
29other related costs for business park
30project

 

1Project Allocation

10,000,000

2(Base Project Allocation -
3$10,000,000)

 

4(K) Acquisition, construction,
5infrastructure, redevelopment and
6other related costs for Zediker
7Station Business Park

 

8Project Allocation

10,000,000

9(Base Project Allocation -
10$10,000,000)

 

11(64) Wayne County

 

12(i) (Reserved)

 

13(65) Westmoreland County

 

14(i) County projects

 

15(A) Construction, renovation,
16modernization, reconstruction and
17expansion of Excela Health System
18Westmoreland Hospital Intensive Care
19and short-stay units

 

20Project Allocation

4,500,000

21(Base Project Allocation - $4,500,000)

 

22(B) Construction of Excela Health System
23Latrobe Ambulatory Care Center

 

24Project Allocation

10,000,000

25(Base Project Allocation -
26$10,000,000)

 

27(C) Construction of Excela Health System
28Orthopedic Center of Excellence

 

29Project Allocation

11,500,000

30(Base Project Allocation -

 

1$11,500,000)

 

2(D) Infrastructure, renovation, abatement
3of hazardous materials, construction
4and other related costs for state-of-
5the-art Southern Alleghenies Museum of
6Art Education, Conference and
7Collection Management Center

 

8Project Allocation

4,000,000

9(Base Project Allocation - $4,000,000)

 

10(ii) Latrobe Redevelopment Authority

 

11(A) Construction of LEED-certified
12multipurpose athletic, educational and
13cultural center

 

14Project Allocation

8,000,000

15(Base Project Allocation - $8,000,000)

 

16(iii) Westmoreland County Industrial
17Development Corporation

 

18(A) Acquisition, demolition, site
19preparation, environmental
20remediation, construction and other
21costs related to redevelopment of
22brownfield and blighted property in
23City of Jeannette for future
24commercial use

 

25Project Allocation

1,000,000

26(Base Project Allocation - $1,000,000)

 

27(B) Acquisition, infrastructure
28extensions and improvements,
29construction and other related costs
30for 150-acre industrial park

 

1Project Allocation

2,000,000

2(Base Project Allocation - $2,000,000)

 

3(iv) City of Lower Burrell

 

4(A) Acquisition, construction,
5demolition, infrastructure,
6redevelopment and other costs related
7to Lower Burrell redevelopment project
8for commercial reuse and development

 

9Project Allocation

2,000,000

10(Base Project Allocation - $2,000,000)

 

<-11(v) City of New Kensington

 

12(A) Construction, acquisition,
13infrastructure, redevelopment and
14other related costs for renovation and
15rehabilitation of downtown business
16district

 

17Project Allocation

5,000,000

18(Base Project Allocation - $5,000,000)

 

19(vi) East Huntingdon Township

 

20(A) Construction, infrastructure,
21redevelopment and other related costs
22for Pittsburgh Supercomputing Center
23projects

 

24Project Allocation

4,000,000

25(Base Project Allocation - $4,000,000)

 

26(vii) Hempfield Township

 

27(A) Acquisition, construction,
28infrastructure, redevelopment and
29other related costs for development
30projects

 

1Project Allocation

10,000,000

2(Base Project Allocation -
3$10,000,000)

 

4(viii) City of Monessen

 

5(A) Construction, redevelopment and other
6related costs for rehabilitation of
7downtown business district

 

8Project Allocation

1,000,000

9(Base Project Allocation - $1,000,000)

 

10(B) Construction, infrastructure and
11other related costs for rail expansion
12project

 

13Project Allocation

750,000

14(Base Project Allocation - $750,000)

 

15(v) <-(ix) North Huntington Township

 

16(A) Construction and other related costs
17for development of regional facility
18to be utilized as a professional
19development center for effective
20teaching and learning of science,
21technology, engineering and
22mathematics

 

23Project Allocation

2,500,000

24(Base Project Allocation - $2,500,000)

 

<-25(x) Upper Burrell Township

 

26(A) Acquisition, infrastructure
27improvements, construction and other
28related costs for industrial park

 

29Project Allocation

5,000,000

30(Base Project Allocation - $5,000,000)

 

1(66) Wyoming County

 

2(i) (Reserved)

 

3(67) York County

 

<-4(i) County projects

 

5(A) Land acquisition, design, adaptive
6reuse and construction of buildings,
7exhibits and related site
8infrastructure for development of
9Susquehanna River visitor education
10center

 

11Project Allocation

2,200,000

12(Base Project Allocation - $2,200,000)

 

<-13(i) Redevelopment Authority of the City of
14York

 

<-15(i.1) Redevelopment Authority of the City of
16York

 

17(A) Acquisition, infrastructure,
18renovation, construction and
19rehabilitation for revitalization of
20West Market Street between George and
21Beaver Streets

 

22Project Allocation

5,000,000

23(Base Project Allocation - $5,000,000)

 

24(B) Acquisition, infrastructure,
25renovation, construction and other
26related costs, including abatement of
27hazardous materials, for redevelopment
28of Northwest Triangle site and
29construction of commercial,
30residential and retail mixed-use

 

1facilities

 

2Project Allocation

6,000,000

3(Base Project Allocation - $6,000,000)

 

4(ii) Redevelopment Authority of the County of
5York

 

6(A) Infrastructure, renovation,
7construction and other related costs
8for redevelopment of downtown Hanover,
9including historic buildings, blighted
10buildings and Hanover State Theatre

 

11Project Allocation

8,000,000

12(Base Project Allocation - $8,000,000)

 

13(B) Infrastructure, construction and
14other related costs for renovations
15and rehabilitation of York College of
16Pennsylvania campuses, including
17classrooms, laboratories, offices and
18student support facilities

 

19Project Allocation

10,000,000

20(Base Project Allocation -
21$10,000,000)

 

22(C) Infrastructure, construction and
23other related costs for renovations
24and rehabilitation of York College of
25Pennsylvania's North Campus, including
26classrooms, laboratories, offices,
27student support and other academic
28facilities

 

29Project Allocation

12,000,000

30(Base Project Allocation -

 

1$12,000,000)

 

2(iii) City of York

 

3(A) Construction, renovation,
4infrastructure and other related costs
5for redevelopment and revitalization
6of Shipley Energy property

 

7Project Allocation

10,000,000

8(Base Project Allocation -
9$10,000,000)

 

<-10(B) Construction, infrastructure,
11acquisition, redevelopment and other
12related costs for renovation of
13existing commercial space

 

<-14(B) Construction, infrastructure,
15acquisition, redevelopment and other
16related costs for construction of new
17buildings in the City of York

 

18Project Allocation

15,000,000

19(Base Project Allocation -
20$15,000,000)

 

21(iv) Red Lion Borough

 

22(A) Construction, infrastructure and
23other related costs for expansion of
24Kaltreider-Benfer Library

 

25Project Allocation

1,040,000

26(Base Project Allocation - $1,040,000)

 

<-27(v) Spring Grove Borough

 

28(A) Construction, abatement of hazardous
29materials, renovation and other
30related costs for Glatfelter to make

 

1modifications to existing cogenerator
2boiler and replacement of three
3existing coal-fired boilers with new
4natural gas-fired package boilers, a
5new natural gas pipeline and
6remediation and demolition of old
7recovery building containing asbestos,
8lead and biological hazards to comply
9with Boiler Maximum Achievable Control
10Technology regulations

 

11Project Allocation

5,000,000

12(Base Project Allocation - $5,000,000)

 

13(68) Multiple Counties

 

14(i) Crawford, Erie, Mercer, Venango and
15Warren Counties

 

16(A) Acquisition, infrastructure,
17renovation and other related costs for
18demolition of existing structures and
19construction of several incubator
20facilities

 

21Project Allocation

5,000,000

22(Base Project Allocation - $5,000,000)

 

23(ii) Centre, Columbia, Lackawanna, Luzerne,
24Mifflin, Montour and Northumberland
25Counties

 

26(A) Acquisition, construction,
27infrastructure, redevelopment and
28other related costs for facilities to
29deliver medical services, conduct
30research and provide other related

 

1activities for Geisinger Health System

 

2Project Allocation

30,000,000

3(Base Project Allocation -
4$30,000,000)

 

5(iii) Pike and Wayne Counties

 

6(A) Wayne Economic Development
7Corporation, land acquisition,
8construction, infrastructure
9development and other related costs
10for career and technology center

 

11Project Allocation

11,000,000

12(Base Project Allocation -
13$11,000,000)

 

14(iv) Berks, Lehigh and York Counties

 

15(A) Redevelopment Authority of the City
16of York, acquisition, site
17preparation, infrastructure,
18construction and other related costs
19for Think Loud Development project in
20Cities of Reading, Allentown and York,
21including renovations and strategic
22reuse of historic properties and
23installation of fiber optic
24infrastructure

 

25Project Allocation

10,000,000

26(Base Project Allocation -
27$10,000,000)

 

28(v) Allegheny, Beaver, Cambria, Erie,
29Washington and Westmoreland Counties

 

30(A) Acquisition, construction,

 

1infrastructure, redevelopment and
2other costs related to Children's
3Hospital of Pittsburgh of UPMC

 

4Project Allocation

10,000,000

5(Base Project Allocation -
6$10,000,000)

 

7(vi) Lackawanna and Luzerne Counties

 

8(A) Acquisition, construction,
9infrastructure and other costs related
10to Mine Drainage Treatment Works
11project

 

12Project Allocation

18,000,000

13(Base Project Allocation -
14$18,000,000)

 

15(vii) Montgomery and Philadelphia Counties

 

16(A) Construction, infrastructure and
17other costs related to Saint Joseph's
18University improvement project

 

19Project Allocation

21,300,000

20(Base Project Allocation -
21$21,300,000)

 

22(B) City Avenue Special Services
23District. Construction, infrastructure
24improvements and other related costs
25on City Avenue for pedestrian and
26vehicular hazard mitigation and storm
27water management in Lower Merion and
28the City of Philadelphia

 

29Project Allocation

5,000,000

30(Base Project Allocation - $5,000,000)

 

1(viii) Berks and Montgomery Counties

 

2(A) Construction, infrastructure and
3other related costs for rehabilitation
4of historic Civil War era railroad
5project

 

6Project Allocation

4,000,000

7(Base Project Allocation - $4,000,000)

 

8(ix) Fayette and Somerset Counties

 

9(A) Infrastructure improvements, new
10construction and renovations at Seven
11Springs Mountain Resort, Seven Springs
12Borough

 

13Project Allocation

5,000,000

14(Base Project Allocation - $5,000,000)

 

<-15(x) Allegheny and Beaver Counties

 

16(A) Site development, new construction,
17acquisition, expansion, additions,
18infrastructure, improvements,
19rehabilitation, renovation and other
20related costs for automated food
21distribution center on a site owned by
22Pittsburgh DC 2013, LLC

 

23Project Allocation

20,000,000

24(Base Project Allocation -
25$20,000,000)

 

26Section 7. Itemization of flood control projects.

27Additional capital projects in the category of flood control
28projects to be constructed by the Department of Environmental
29Protection, its successors or assigns, and to be financed by the
30incurring of debt are hereby itemized, together with their

1respective estimated costs, as follows:

2 

3Project

Total Project

Allocation

4(1) Department of Environmental Protection

 

5(i) Allegheny County

 

6(A) Funding for flood protection and
7rehabilitation of Pine Creek in Shaler
8Township

 

9Project Allocation

900,000

10(Base Project Allocation - $810,000)

 

11(Design & Contingencies - $90,000)

 

12(B) Infrastructure, construction and
13other costs related to Pine Creek
14Watershed flood control project,
15including reconstruction of culvert
16and retrofit of three existing
17detention basins

 

18Project Allocation

96,000

19(Base Project Allocation - $80,000)

 

20(Design & Contingencies - $16,000)

 

<-21(ii) Bucks County

 

22(A) Construction and other related costs
23to construct stream bed line with
24riprap and bank stabilization to
25control erosion and flooding in
26Langhorne Borough

 

27Project Allocation

100,000

28(Base Project Allocation - $100,000)

 

29(B) Rehabilitation and other related
30costs for retention basin for

 

1Poquessing Creek in Bensalem Township

 

2Project Allocation

500,000

3(Base Project Allocation - $500,000)

 

4(ii) <-(iii) Cambria County

 

5(A) Additional funding for DGS Project
6184-34, City of Johnstown, channel
7improvements to St. Clair Run,
8including rehabilitation and
9mitigation

 

10Project Allocation

1,350,000

11(Base Project Allocation - $1,215,000)

 

12(Design & Contingencies - $135,000)

 

13(B) Funding for flood protection of
14Solomon's Run, including
15rehabilitation and mitigation, in City
16of Johnstown

 

17Project Allocation

540,000

18(Base Project Allocation - $486,000)

 

19(Design & Contingencies - $54,000)

 

20(C) Rehabilitate five levee drainage
21structures along Chest Creek and
22Flannigan Run, including mitigation,
23in Patton Borough and Chest and Elder
24Townships

 

25Project Allocation

1,350,000

26(Base Project Allocation - $1,215,000)

 

27(Design & Contingencies - $135,000)

 

28(D) Funding for flood protection of
29Solomon's Run, including
30rehabilitation and mitigation, in

 

1Stonycreek Township and Dale Borough

 

2Project Allocation

900,000

3(Base Project Allocation - $810,000)

 

4(Design & Contingencies - $90,000)

 

<-5(iv) Chester County

 

6(A) Construction, infrastructure and
7other related costs for storm water
8control in Schuylkill Township

 

9Project Allocation

7,000,000

10(Base Project Allocation - $7,000,000)

 

11(B) Construction, infrastructure and
12other related costs to address
13existing watershed problems,
14accelerated stream bank erosion and
15water quality in Tredyffrin Township

 

16Project Allocation

9,000,000

17(Base Project Allocation - $9,000,000)

 

<-18(C) Acquisition, construction,
19infrastructure, redevelopment and
20other related costs for flood
21mitigation projects along Chester
22Creek, including upgrades to levee

 

23Project Allocation

10,000,000

24(Base Project Allocation -
25$10,000,000)

 

26(v) Columbia County

 

27(A) Rehabilitation and other related
28costs for bank stabilization, gravel
29bar removal and debris removal at
30Columbia County Soil Conservation

 

1Project Allocation

1,000,000

2(Base Project Allocation - $1,000,000)

 

3(iii) <-(vi) Delaware County

 

4(A) Construction, infrastructure and
5other costs related to installation of
6stream gauge on Darby Creek

 

7Project Allocation

538,000

8(Base Project Allocation - $538,000)

 

9(B) Acquisition, demolition,
10construction, infrastructure and other
11costs related to Darby Borough flood
12remediation program

 

13Project Allocation

6,200,000

14(Base Project Allocation - $6,200,000)

 

<-15(C) Upgrades and deferred maintenance,
16Phase VII

 

17Project Allocation

550,000

18(Base Project Allocation - $550,000)

 

19(iv) <-(vii) Lackawanna County

 

20(A) Rehabilitate seven levee drainage
21structures along Lackawanna River,
22including mitigation, in Mayfield
23Borough

 

24Project Allocation

2,700,000

25(Base Project Allocation - $2,430,000)

 

26(Design & Contingencies - $270,000)

 

27(B) Funding for Moosic flood protection
28project, including rehabilitation and
29mitigation, along Spring Creek

 

30Project Allocation

2,700,000

1(Base Project Allocation - $2,430,000)

 

2(Design & Contingencies - $270,000)

 

3(C) Funding for Blakely flood protection
4project, including rehabilitation and
5mitigation, along Hull Creek in
6Blakely and Dickson City Boroughs

 

7Project Allocation

900,000

8(Base Project Allocation - $810,000)

 

9(Design & Contingencies - $90,000)

 

10(D) Funding for Scranton flood control
11project, including rehabilitation and
12mitigation, along Roaring Brook

 

13Project Allocation

4,500,000

14(Base Project Allocation - $4,050,000)

 

15(Design & Contingencies - $450,000)

 

16(E) Construction, infrastructure and
17other related costs for Racket Brook
18Creek retaining wall replacement
19project in City of Carbondale

 

20Project Allocation

1,540,000

21(Base Project Allocation - $1,540,000)

 

22(F) Construction, infrastructure and
23other related costs for Mayfield
24Borough levee extension project

 

25Project Allocation

772,000

26(Base Project Allocation - $772,000)

 

<-27(G) Construction, infrastructure and
28other related costs for Tinklepaugh
29Creek flood mitigation projects in
30Archbald and Blakely Boroughs

 

1Project Allocation

2,500,000

2(Base Project Allocation - $2,500,000)

 

3(v) (<-viii) Luzerne County

 

4(A) Additional funding for DGS Project
5182-3, flood protection project for
6Wadham Creek, including rehabilitation
7and mitigation, in Plymouth Borough

 

8Project Allocation

540,000

9(Base Project Allocation - $486,000)

 

10(Design & Contingencies - $54,000)

 

11(B) Funding for Mocanaqua flood
12protection project, including
13rehabilitation and mitigation along
14Turtle Creek, in Conyngham Township

 

15Project Allocation

540,000

16(Base Project Allocation - $486,000)

 

17(Design & Contingencies - $54,000)

 

18(vi) <-(ix) Montgomery County

 

19(A) Funding for Ambler flood protection
20project, including acquisition,
21infrastructure, rehabilitation and
22construction of storm water bypass
23facility, culverts and upstream
24neighborhood regional detention basins

 

25Project Allocation

2,475,000

26(Base Project Allocation - $2,250,000)

 

27(Design & Contingencies - $225,000)

 

28(B) Funding for Turnpike Drive storm
29water improvement project, including
30infrastructure, rehabilitation and

 

1construction of regional storm water
2management basin in Upper Moreland
3Township

 

4Project Allocation

550,000

5(Base Project Allocation - $500,000)

 

6(Design & Contingencies - $50,000)

 

7(C) Acquisition, construction,
8infrastructure and other costs related
9to Glenside Flood Control buyout
10project in Cheltenham Township

 

11Project Allocation

8,000,000

12(Base Project Allocation - $8,000,000)

 

13(D) Construction, infrastructure and
14other costs related to flood control
15improvement projects in headwaters of
16Tookany Creek in Cheltenham Township

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(E) Construction, infrastructure and
20other costs related to Glenside flood
21control project Phase II in Cheltenham
22Township

 

23Project Allocation

5,000,000

24(Base Project Allocation - $5,000,000)

 

<-25(F) Acquisition, construction,
26infrastructure and other costs related
27to Glenside area flood protection
28project

 

29Project Allocation

8,000,000

30(Base Project Allocation - $8,000,000)

 

1(G) Construction, infrastructure and
2other costs related to Glenside area
3flood protection project, Phase II, in
4Cheltenham Township along Tookany
5Creek

 

6Project Allocation

3,000,000

7(Base Project Allocation - $3,000,000)

 

8(H) Construction, infrastructure and
9other related costs to Tookany Creek
10headwaters flood control project

 

11Project Allocation

1,000,000

12(Base Project Allocation - $1,000,000)

 

13(vii) <-(x) Northampton County

 

14(A) Permanent reconstruction of storm
15sewer system causing the flooding of
16private, residential properties in
17Bangor Borough

 

18Project Allocation

506,000

19(Base Project Allocation - $506,000)

 

<-20(xi) Northumberland County

 

21(A) Construction, infrastructure,
22acquisition and other related costs
23for rehabilitation of Shamokin Creek
24and Quaker Run Creek channels to
25alleviate flooding in Coal Township

 

26Project Allocation

14,000,000

27(Base Project Allocation -
28$14,000,000)

 

29(B) Repairs to mitigate flood water in
30several areas throughout Lower Saucon

 

1Township

 

2Project Allocation

1,250,000

3(Base Project Allocation - $1,250,000)

 

4(viii) <-(xii) Potter County

 

5(A) Rehabilitate three levee drainage
6structures along Allegheny River and
7Mill Creek, including mitigation, in
8Coudersport Borough

 

9Project Allocation

900,000

10(Base Project Allocation - $810,000)

 

11(Design & Contingencies - $90,000)

 

12(ix) <-(xiii) Schuylkill County

 

13(A) Funding for McAdoo flood protection
14project, including rehabilitation and
15mitigation, along Celebration Creek in
16McAdoo, Kline and Banks Townships

 

17Project Allocation

540,000

18(Base Project Allocation - $486,000)

 

19(Design & Contingencies - $54,000)

 

20(x) <-(xiv) Somerset County

 

21(A) Rehabilitate 25 levee drainage
22structures along Paint Creek,
23including mitigation, in Windber and
24Paint Boroughs

 

25Project Allocation

4,950,000

26(Base Project Allocation - $4,455,000)

 

27(Design & Contingencies - $495,000)

 

28(B) Rehabilitate 18 levee drainage
29structures along Coxes Creek,
30including mitigation, in Rockwood

 

1Borough

 

2Project Allocation

3,600,000

3(Base Project Allocation - $3,240,000)

 

4(Design & Contingencies - $360,000)

 

5(C) Construction, infrastructure and
6other costs related to North Fork dam
7and bridge modifications and repair
8project

 

9Project Allocation

10,000,000

10(Base Project Allocation -
11$10,000,000)

 

<-12(D) Construction, redevelopment,
13rehabilitation and other related costs
14for Hyndman Borough levee

 

15Project Allocation

500,000

16(Base Project Allocation - $500,000)

 

17(xi) <-(xv) Warren County

 

18(A) Rehabilitate nine levee drainage
19structures along Glade Run, including
20mitigation, in City of Warren

 

21Project Allocation

1,800,000

22(Base Project Allocation - $1,620,000)

 

23(Design & Contingencies - $180,000)

 

24(xii) <-(xvi) Wayne County

 

25(A) Funding for White Mills channel
26improvement project, including
27rehabilitation and mitigation along
28Lollipop Creek, at White Mills
29Village, Texas Township

 

30Project Allocation

540,000

1(Base Project Allocation - $486,000)

 

2(Design & Contingencies - $54,000)

 

3(xiii) <-(xvii) Westmoreland County

 

4(A) Rehabilitate existing flood
5protection along Jacks Run, including
6levee rehabilitation, slope
7stabilization, flood wall repairs,
8concrete channel construction and
9replacement of three drainage
10structures in South Greensburg Borough

 

11Project Allocation

3,600,000

12(Base Project Allocation - $3,240,000)

 

13(Design & Contingencies - $360,000)

 

<-14(xiii.1) Westmoreland County

 

15(A) <-(B) Additional funding for DGS
16Project 182-7, flood protection in
17Jeannette City and Penn Borough

 

18Project Allocation

5,000,000

19(Base Project Allocation - $5,000,000)

 

<-20(C) Acquisition, construction,
21infrastructure and other related costs
22for flood plain improvements,
23retention ponds, retaining walls and
24acid mine mitigation sites in
25Murrysville Borough

 

26Project Allocation

750,000

27(Base Project Allocation - $750,000)

 

28(xiv) <-(xviii) Somerset and Fayette Counties

 

29(A) Rehabilitate 18 levee drainage
30structures along the Youghiogheny and

 

1Casselman Rivers, including
2mitigation, in Confluence Borough

 

3Project Allocation

4,050,000

4(Base Project Allocation - $3,645,000)

 

5(Design & Contingencies - $405,000)

 

6(xv) <-(xix) Chester, Delaware and Montgomery
7Counties

 

8(A) Regional watershed improvement
9project, including funding for ACE
10feasibility study

 

11Project Allocation

125,000

12(Base Project Allocation - $125,000)

 

13Section 8. Itemization of Keystone Recreation, Park and
14Conservation Fund projects.

15Projects in the category of public improvement projects to be
16constructed by the Department of Conservation and Natural
17Resources, its successors or assigns and to be financed by
18current revenues of the Keystone Recreation, Park and
19Conservation Fund are hereby itemized, together with their
20respective estimated costs, as follows:

21 

22Project

Total Project
Allocation

23(1) Department of Conservation and Natural
24Resources

 

25(i) Bald Eagle State Forest

 

26(A) Rehabilitate or replace Sand Mountain
27Trail

 

28Project Allocation

316,000

29(Base Project Allocation - $316,000)

 

30(B) Upgrade sewage treatment plant

 

1Project Allocation

500,000

2(Base Project Allocation - $500,000)

 

3(ii) Bald Eagle State Park

 

4(A) Renovate park office to meet
5accessibility requirements and improve
6visitor services

 

7Project Allocation

1,000,000

8(Base Project Allocation - $1,000,000)

 

9(iii) Blue Knob State Park

 

10(A) Pave and replace culverts at Willow
11Springs Road

 

12Project Allocation

250,000

13(Base Project Allocation - $250,000)

 

14(iv) Buchanan State Forest

 

15(A) Construct Buchanan Resource
16Management Center

 

17Project Allocation

1,750,000

18(Base Project Allocation - $1,750,000)

 

19(v) Caledonia State Park

 

20(A) Replace shower houses and comfort
21stations in Chinquapin Hill Campground
22and renovate campsites

 

23Project Allocation

1,300,000

24(Base Project Allocation - $1,300,000)

 

25(vi) Codorus State Park

 

26(A) Replace sailboat areas and restrooms
27and rehabilitate sewage system

 

28Project Allocation

450,000

29(Base Project Allocation - $450,000)

 

30(vii) Cook Forest State Park

 

1(A) Rehabilitate water storage tanks,
2including cleaning, painting,
3replacing level controls and
4maintenance access

 

5Project Allocation

600,000

6(Base Project Allocation - $600,000)

 

7(B) Repair sewage line inflow and
8infiltration

 

9Project Allocation

250,000

10(Base Project Allocation - $250,000)

 

11(viii) Cook State Forest

 

12(A) Replace sewage lines

 

13Project Allocation

175,000

14(Base Project Allocation - $175,000)

 

15(ix) Delaware Canal State Park

 

16(A) Replace Ferry Street Bridge

 

17Project Allocation

900,000

18(Base Project Allocation - $900,000)

 

19(B) Replace Smithtown Bridge No. 5

 

20Project Allocation

800,000

21(Base Project Allocation - $800,000)

 

22(C) Replace or rehabilitate Phillips
23Mills, Smithtown No. 3 and Lower
24Limeport Bridges

 

25Project Allocation

1,200,000

26(Base Project Allocation - $1,200,000)

 

27(D) Replace culverts on Rabbit Run

 

28Project Allocation

750,000

29(Base Project Allocation - $750,000)

 

30(E) Reconstruct canal overflows along

 

1canal

 

2Project Allocation

1,000,000

3(Base Project Allocation - $1,000,000)

 

4(x) Denton Hill State Park

 

5(A) Upgrade, rehabilitation or
6replacement of ski lift, lighting,
7equipment, parking and structures to
8improve operations and safety to
9public

 

10Project Allocation

750,000

11(Base Project Allocation - $750,000)

 

12(xi) Evansburg State Park

 

13(A) Replace sewer lines throughout park

 

14Project Allocation

480,000

15(Base Project Allocation - $480,000)

 

16(xii) Frances Slocum State Park

 

17(A) Demolish sewage treatment plant and
18construct municipal sewer connection

 

19Project Allocation

900,000

20(Base Project Allocation - $900,000)

 

21(xii.1) French Creek State Park

 

22(A) Construct Schuylkill River Trail
23connection

 

24Project Allocation

600,000

25(Base Project Allocation - $600,000)

 

26(xiii) Gifford Pinchot State Park

 

27(A) Rehabilitate five shower houses

 

28Project Allocation

1,500,000

29(Base Project Allocation - $1,500,000)

 

30(xiv) Hickory Run State Park

 

1(A) Replace pit latrines with modern
2comfort stations in two organized
3group camps

 

4Project Allocation

2,200,000

5(Base Project Allocation - $2,200,000)

 

6(xv) Hills Creek State Park

 

7(A) Rehabilitate sewage treatment plant,
8sewer lines and lift stations

 

9Project Allocation

250,000

10(Base Project Allocation - $250,000)

 

11(B) Replace campground washhouses

 

12Project Allocation

2,500,000

13(Base Project Allocation - $2,500,000)

 

14(xvi) Lackawanna State Park

 

15(A) Rehabilitate pool complex and day use
16area, including renovation of bath
17houses and addition of space for
18lifeguard and first aid station

 

19Project Allocation

3,000,000

20(Base Project Allocation - $3,000,000)

 

21(xvi.1) Lackawanna State Forest

 

22(A) Construct pole building for equipment
23storage at Thornhurst

 

24Project Allocation

244,000

25(Base Project Allocation - $244,000)

 

26(xvii) Laurel Ridge State Park

 

27(A) Replace Laurel Highlands Hiking Trail
28Bridge within the park and construct
29horse trail and parking/camping
30facilities at Bakers Run

 

1Project Allocation

1,600,000

2(Base Project Allocation - $1,600,000)

 

3(xvii.1) Lehigh Gorge State Park

 

4(A) Replace Drake's Creek Bridge No. 0508

 

5Project Allocation

300,000

6(Base Project Allocation - $300,000)

 

7(B) Repair Glen Onoko Bridge, Phase 1

 

8Project Allocation

300,000

9(Base Project Allocation - $300,000)

 

10(C) Replace Bald Mountain Bridge

 

11Project Allocation

250,000

12(Base Project Allocation - $250,000)

 

13(xviii) Little Pine State Park

 

14(A) Rehabilitate shooting range to meet
15current safety and accessibility
16standards

 

17Project Allocation

400,000

18(Base Project Allocation - $400,000)

 

19(xviii.1) Locust Lake State Park

 

20(A) Rehabilitate sewage treatment plant

 

21Project Allocation

300,000

22(Base Project Allocation - $300,000)

 

23(xix) Loyalsock State Forest

 

24(A) Rehabilitate Hillsgrove Ranger
25Station equipment storage shed

 

26Project Allocation

525,000

27(Base Project Allocation - $525,000)

 

28(B) Repair Pleasant Stream Road

 

29Project Allocation

200,000

30(Base Project Allocation - $200,000)

 

1(C) Repair Sones Pond Dam, including
2replacing outlet structure and
3repairing embankment

 

4Project Allocation

300,000

5(Base Project Allocation - $300,000)

 

6(xix.1) Marsh Creek State Park

 

7(A) Emergency spillway concrete repairs
8at dam

 

9Project Allocation

450,000

10(Base Project Allocation - $450,000)

 

11(xix.2) Michaux State Forest

 

12(A) Construct equipment storage building

 

13Project Allocation

250,000

14(Base Project Allocation - $250,000)

 

15(xix.3) Park Region 3

 

16(A) Replace HVAC system and upgrade ADA
17accessibility at regional office

 

18Project Allocation

200,000

19(Base Project Allocation - $200,000)

 

20(xx) Moraine State Park

 

21(A) Upgrade sewage treatment plant

 

22Project Allocation

3,500,000

23(Base Project Allocation - $3,500,000)

 

24(B) Rehabilitate and upgrade water
25treatment plant

 

26Project Allocation

1,500,000

27(Base Project Allocation - $1,500,000)

 

28(xxi) Nescopeck State Park

 

29(A) Construct culvert at Riley's Pond

 

30Project Allocation

600,000

1(Base Project Allocation - $600,000)

 

2(xxii) Nockamixon State Park

 

3(A) Replace pit latrines with modern
4comfort stations

 

5Project Allocation

650,000

6(Base Project Allocation - $650,000)

 

7(B) Replace boat rental docks

 

8Project Allocation

400,000

9(Base Project Allocation - $400,000)

 

10(xxiii) Ohiopyle State Park

 

11(A) Repair sewage collection system and
12sewage treatment plant to meet current
13effluent standards

 

14Project Allocation

3,500,000

15(Base Project Allocation - $3,500,000)

 

16(xxiv) Park Region 1

 

17(A) Renovate or replace HVAC system at
18regional office

 

19Project Allocation

250,000

20(Base Project Allocation - $250,000)

 

21(xxv) Presque Isle State Park

 

22(A) Provide for road flooding mitigation,
23Predisaster Mitigation Grant Project

 

24Project Allocation

400,000

25(Base Project Allocation - $400,000)

 

26(B) Replace sand mound Phase 4 B11 and
27B10

 

28Project Allocation

250,000

29(Base Project Allocation - $250,000)

 

30(xxvi) Prince Gallitzin State Park

 

1(A) Rehabilitate Beaver Valley Marina

 

2Project Allocation

3,000,000

3(Base Project Allocation - $3,000,000)

 

4(xxvii) Pymatuning State Park

 

5(A) Connect Jamestown sewage to sewer
6authority

 

7Project Allocation

500,000

8(Base Project Allocation - $500,000)

 

9(B) Demolish sewage treatment plant at
10Linesville

 

11Project Allocation

250,000

12(Base Project Allocation - $250,000)

 

13(C) Rehabilitate Linesville Livery

 

14Project Allocation

2,000,000

15(Base Project Allocation - $2,000,000)

 

16(xxviii) Ricketts Glen State Park

 

17(A) Replace pit latrine along Route 118
18with modern flush facility

 

19Project Allocation

400,000

20(Base Project Allocation - $400,000)

 

21(B) Replace dam controls and outlet works

 

22Project Allocation

800,000

23(Base Project Allocation - $800,000)

 

24(C) Reconstruct main park road and
25parking lots with repaving

 

26Project Allocation

750,000

27(Base Project Allocation - $750,000)

 

28(xxix) Ridley Creek State Park

 

29(A) Renovate mansion kitchen

 

30Project Allocation

250,000

1(Base Project Allocation - $250,000)

 

2(xxx) Salt Springs State Park

 

3(A) Replace existing sanitary station
4with new comfort station, including
5infrastructure

 

6Project Allocation

437,000

7(Base Project Allocation - $437,000)

 

8(xxxi) Shawnee State Park

 

9(A) Pave areas near and around
10campgrounds

 

11Project Allocation

250,000

12(Base Project Allocation - $250,000)

 

13(xxxii) Shikellamy State Park

 

14(A) Construct permanent causeway

 

15Project Allocation

1,500,000

16(Base Project Allocation - $1,500,000)

 

17(B) Replace Bag Nos. 6 and 7 and
18construct permanent causeway

 

19Project Allocation

1,000,000

20(Base Project Allocation - $1,000,000)

 

21(xxxiii) Sinnemahoning State Park

 

22(A) Rehabilitate dam gates operators,
23including electrical repairs

 

24Project Allocation

250,000

25(Base Project Allocation - $250,000)

 

26(B) Rehabilitate access roadway to
27visitors' center

 

28Project Allocation

250,000

29(Base Project Allocation - $250,000)

 

30(xxxiv) Sproul State Forest

 

1(A) Rehabilitate Baker's Run horse
2trailer parking/camping

 

3Project Allocation

250,000

4(Base Project Allocation - $250,000)

 

5(B) Rehabilitate Baker's Run boat launch
6and canoe access

 

7Project Allocation

200,000

8(Base Project Allocation - $200,000)

 

9(C) Construct Hyner hang gliding landing
10strip within park

 

11Project Allocation

225,000

12(Base Project Allocation - $225,000)

 

13(xxxv) Susquehannock State Park

 

14(A) Rehabilitate roads and drainage and
15pave main park roads

 

16Project Allocation

250,000

17(Base Project Allocation - $250,000)

 

18(xxxvi) Tiadaghton State Forest

 

19(A) Relocate Trout Run Road

 

20Project Allocation

225,000

21(Base Project Allocation - $225,000)

 

22(B) Construct trail bridge along Black
23Forest Trail over Slate Run

 

24Project Allocation

200,000

25(Base Project Allocation - $200,000)

 

26(xxxvi.1) Tioga State Forest

 

27(A) Upgrade to Pine Creek Trail and 287
28at-grade trail crossing

 

29Project Allocation

175,000

30(Base Project Allocation - $175,000)

 

1(xxxvii) Tobyhanna State Park

 

2(A) Pave roads throughout park

 

3Project Allocation

350,000

4(Base Project Allocation - $350,000)

 

5(xxxviii) Weiser State Forest

 

6(A) Construct Weiser Resource Management
7Center

 

8Project Allocation

3,300,000

9(Base Project Allocation - $3,300,000)

 

10(xxxix) Worlds End State Park

 

11(A) Reconstruct cabin area access

 

12Project Allocation

2,000,000

13(Base Project Allocation - $2,000,000)

 

14(xl) Yellow Creek State Park

 

15(A) Rehabilitate beach area buildings

 

16Project Allocation

600,000

17(Base Project Allocation - $600,000)

 

18Section 9. Itemization of State forestry bridge projects.

19Projects in the category of State forestry bridge projects to
20be constructed by the Department of Conservation and Natural
21Resources, its successors or assigns, and to be financed by oil
22company franchise tax revenues pursuant to 75 Pa.C.S. §
239502(a)(2)(iv) (related to imposition of tax) are hereby
24itemized, together with their respective estimated costs, as
25follows:

26 

27Project

Total Project
Allocation

28(1) Cameron County

 

29(i) Elk State Forest

 

30(A) Rehabilitate Whitehead Road/Whitehead

 

1Run - 9000

 

2Project Allocation

250,000

3(Base Project Allocation - $250,000)

 

4(B) Replace bridge on Whitehead Road over
5Whitehead Run

 

6Project Allocation

250,000

7(Base Project Allocation - $250,000)

 

8(C) Replace bridge on Naval Hollow Road
9over Naval Hollow Creek

 

10Project Allocation

150,000

11(Base Project Allocation - $150,000)

 

12(D) Replace bridge on Ford -
13administration road over East Branch
14of Hicks Run

 

15Project Allocation

250,000

16(Base Project Allocation - $250,000)

 

17(E) Replace bridge on Bell Draft Road
18over McDonald Run

 

19Project Allocation

300,000

20(Base Project Allocation - $300,000)

 

21(F) Replace bridge on Bell Draft Road
22over Bell Draft Run

 

23Project Allocation

200,000

24(Base Project Allocation - $200,000)

 

25(G) Replace bridge on Bell Draft Road
26over Shaffer Draft

 

27Project Allocation

150,000

28(Base Project Allocation - $150,000)

 

29(2) Centre County

 

30(i) Moshannon State Forest

 

1(A) Replace Shirks Road over Black
2Moshannon Creek Bridge No. 9-0028

 

3Project Allocation

300,000

4(Base Project Allocation - $300,000)

 

5(B) Replace Clay Mine Road over Six Mile
6Run - No. 0029 bridge and Huckleberry
7Road over Black Moshannon Creek - No.
80016

 

9Project Allocation

700,000

10(Base Project Allocation - $700,000)

 

11(3) Clarion County

 

12(i) Kittanning State Forest

 

13(A) Replace bridge on Corbett Road over
14Little Clear Creek and bridge on
15Corbett Road over Clear Creek

 

16Project Allocation

400,000

17(Base Project Allocation - $400,000)

 

18(4) Clearfield County

 

19(i) Moshannon State Forest

 

20(A) Replace bridge on Laurel Ridge Road
21over Laurel Run and bridge on Jack
22Dent Road over Medix Run

 

23Project Allocation

650,000

24(Base Project Allocation - $650,000)

 

25(B) Replace bridge on Ames Road over Deer
26Creek

 

27Project Allocation

200,000

28(Base Project Allocation - $200,000)

 

29(5) Clinton County

 

30(i) Sproul State Forest

 

1(A) Replace Beaver Dam Road over left
2fork of Beaver Dam Run

 

3Project Allocation

400,000

4(Base Project Allocation - $400,000)

 

5(B) Replace culvert at Little Greenlick
6Road over Little Greenlick Run

 

7Project Allocation

250,000

8(Base Project Allocation - $250,000)

 

9(C) Replace Birch Island Road over Amos
10Branch Bridge No. 10-0040

 

11Project Allocation

300,000

12(Base Project Allocation - $300,000)

 

13(D) Replace State Line Road over Beauty
14Run Bridge No. 10-0029

 

15Project Allocation

325,000

16(Base Project Allocation - $325,000)

 

17(E) Replace bridge on Graham Road over
18Ferney Road

 

19Project Allocation

200,000

20(Base Project Allocation - $200,000)

 

21(F) Replace bridge on Penrose Road over
22box culvert, near intersection with
23Coon Run Road

 

24Project Allocation

150,000

25(Base Project Allocation - $150,000)

 

26(G) Replace bridge on Birch Island Road
27over Amos Branch

 

28Project Allocation

175,000

29(Base Project Allocation - $175,000)

 

30(H) Replace bridge on Slate Line Road

 

1over Beauty Run

 

2Project Allocation

200,000

3(Base Project Allocation - $200,000)

 

4(I) Replace bridge on Birch Island Road
5over Amos Branch

 

6Project Allocation

175,000

7(Base Project Allocation - $175,000)

 

8(6) Elk County

 

9(i) Elk State Forest

 

10(A) Replace Dents Run Road over Bear
11Hollow No. 13-9005 and Weatherboard
12Run No. 13-9006

 

13Project Allocation

500,000

14(Base Project Allocation - $500,000)

 

15(B) Replace Bridge No. 13-9025, Little
16Dents Road over Little Dents Run

 

17Project Allocation

200,000

18(Base Project Allocation - $200,000)

 

19(7) Huntingdon County

 

20(i) Rothrock State Forest

 

21(A) Replace old culvert at Laurel Run
22Road with box culvert over tributary
23to Galbraith Gap Run

 

24Project Allocation

100,000

25(Base Project Allocation - $100,000)

 

26(B) Rehabilitate bridge at Crowfield Road
27over Standing Stone Creek

 

28Project Allocation

150,000

29(Base Project Allocation - $150,000)

 

30(C) Replace pipe culvert at Thickhead

 

1Mountain Road over Sinking Creek

 

2Project Allocation

200,000

3(Base Project Allocation - $200,000)

 

4(D) Replace three small box culverts at
5Martin and Frew Roads

 

6Project Allocation

500,000

7(Base Project Allocation - $500,000)

 

8(E) Replace bridge at Beidler Road over
9Laurel Run

 

10Project Allocation

350,000

11(Base Project Allocation - $350,000)

 

12(F) Replace bridge on Lingle Valley Road
13over Laurel Creek

 

14Project Allocation

350,000

15(Base Project Allocation - $350,000)

 

16(G) Replace bridges on Martin Gap Road 1
17and 2 and on Frew Road

 

18Project Allocation

600,000

19(Base Project Allocation - $600,000)

 

20(H) Replace bridge on Diamond Valley Road
21over Globe Run, No. 5-0023, No. 24

 

22Project Allocation

400,000

23(Base Project Allocation - $400,000)

 

24(I) Replace bridge on Crowfield Road over
25Standing Stone Creek

 

26Project Allocation

150,000

27(Base Project Allocation - $150,000)

 

28(J) Replace bridge on Thickhead Mountain
29Road over Sinking Creek

 

30Project Allocation

200,000

1(Base Project Allocation - $200,000)

 

2(K) Replace bridge on Laurel Run Road
3over tributary to Galbraith Gap Run

 

4Project Allocation

175,000

5(Base Project Allocation - $175,000)

 

6(L) Install guiderail at seven bridges

 

7Project Allocation

350,000

8(Base Project Allocation - $350,000)

 

9(8) Lycoming County

 

10(i) Tiadaghton State Forest

 

11(A) Replace Four Frances Road/Slate Run
12Road structures

 

13Project Allocation

800,000

14(Base Project Allocation - $800,000)

 

15(B) Replace Limbaugh Road over English
16Run culvert

 

17Project Allocation

225,000

18(Base Project Allocation - $225,000)

 

19(C) Replace Bridge No. 16-0001 on Spoor
20Hollow Road over Norris Brook

 

21Project Allocation

325,000

22(Base Project Allocation - $325,000)

 

23(ii) Tioga State Forest

 

24(A) Replace Owasse Road/Chimney Hollow

 

25Project Allocation

175,000

26(Base Project Allocation - $175,000)

 

27(B) Replace Cedar Mountain Road over
28Cedar Run Bridge No. 16-0014

 

29Project Allocation

300,000

30(Base Project Allocation - $300,000)

 

1(C) Replace Landrus Road at South Creek -
2No. 0023

 

3Project Allocation

325,000

4(Base Project Allocation - $325,000)

 

5(D) Replace Spoor Hollow Road over Norris
6Brook Bridge No. 16-0001

 

7Project Allocation

325,000

8(Base Project Allocation - $325,000)

 

9(E) Replace bridge on Zinck Fork Road
10over Upper Pine Bottom, No. 12-0047

 

11Project Allocation

250,000

12(Base Project Allocation - $250,000)

 

13(F) Replace bridges on Slate Run Road
14over Manor Fork No. 12-0041, Daugherty
15Run No. 12-9006 and culvert at Fill
16Trestle No. 12-9028

 

17Project Allocation

600,000

18(Base Project Allocation - $600,000)

 

19(G) Replace bridge on Cove Road over
20Fourth Gap

 

21Project Allocation

250,000

22(Base Project Allocation - $250,000)

 

23(H) Replace bridge on English Run Road
24over English Run

 

25Project Allocation

325,000

26(Base Project Allocation - $325,000)

 

27(I) Replace bridge on Lower Pine Road
28over Lower Pine Bottom Run

 

29Project Allocation

350,000

30(Base Project Allocation - $350,000)

 

1(9) Monroe County

 

2(i) Delaware State Forest

 

3(A) Replace bridge on Five Mile Meadow
4Road over unnamed creek and bridge on
5Five Mile Meadow Road over Little
6Bushkill Creek

 

7Project Allocation

300,000

8(Base Project Allocation - $300,000)

 

9(B) Replace bridge on Bald Hill Road over
10unnamed creek

 

11Project Allocation

280,000

12(Base Project Allocation - $280,000)

 

13(C) Replace bridge on Gunter Valley Road
14over Trout Run

 

15Project Allocation

200,000

16(Base Project Allocation - $200,000)

 

17(D) Replace Gunter Valley box culvert

 

18Project Allocation

200,000

19(Base Project Allocation - $200,000)

 

20(10) Perry County

 

21(i) Tuscarora State Forest

 

22(A) Replace bridge over Couch Road

 

23Project Allocation

150,000

24(Base Project Allocation - $150,000)

 

25(B) Replace bridge at Colonel Denning
26Road over Doubling Gap Creek

 

27Project Allocation

175,000

28(Base Project Allocation - $175,000)

 

29(C) Replace bridge on Gunter Valley Road
30over Trout Run

 

1Project Allocation

200,000

2(Base Project Allocation - $200,000)

 

3(D) Replace Meadow Run Road Bridge over
4Laurel Run

 

5Project Allocation

300,000

6(Base Project Allocation - $300,000)

 

7(E) Replace bridge on Couch Road

 

8Project Allocation

150,000

9(Base Project Allocation - $150,000)

 

10(F) Replace bridge on Gunter Valley

 

11Project Allocation

200,000

12(Base Project Allocation - $200,000)

 

13(G) Replace bridge on access road for
14Colonel Denning over Doubling Gap
15Creek

 

16Project Allocation

175,000

17(Base Project Allocation - $175,000)

 

18(11) Potter County

 

19(i) Elk State Forest

 

20(A) Replace structures for Bridge No. 13-
210045, East Cowley Run Road over East
22Cowley Run

 

23Project Allocation

300,000

24(Base Project Allocation - $300,000)

 

25(ii) Susquehannock State Forest

 

26(A) Replace Bridge No. 15-9013, Nelson
27Run Road over Gas Well Hollow

 

28Project Allocation

200,000

29(Base Project Allocation - $200,000)

 

30(12) Schuylkill County

 

1(i) Weiser State Forest

 

2(A) Construct a roadway and culvert over
3stream at Jefferson Tract and Road in
4South Manheim Township

 

5Project Allocation

200,000

6(Base Project Allocation - $200,000)

 

7(B) Replace White Oak Road over Wolf Run
8and Mud Run and Lykens Road - No. 9000

 

9Project Allocation

400,000

10(Base Project Allocation - $400,000)

 

11(C) Construct culvert at Weaver Road,
12Second Mountain over unnamed tributary

 

13Project Allocation

200,000

14(Base Project Allocation - $200,000)

 

15(D) Replace bridge on Jefferson Tract and
16Road

 

17Project Allocation

200,000

18(Base Project Allocation - $200,000)

 

19(E) Replace bridge on Weaver Road, Second
20Mountain over ford crossing

 

21Project Allocation

200,000

22(Base Project Allocation - $200,000)

 

23(F) Replace bridges on White Oak over
24Wolf Run and White Oak over Mud Run

 

25Project Allocation

400,000

26(Base Project Allocation - $400,000)

 

27(G) Replace bridges on Roaring Creek
28Tract

 

29Project Allocation

700,000

30(Base Project Allocation - $700,000)

 

1(H) Construct Weaver Road ford crossing
2box culvert

 

3Project Allocation

200,000

4(Base Project Allocation - $200,000)

 

5(13) Somerset County

 

6(i) Forbes State Forest

 

7(A) Replace three bridges at South Wolf
8Rock Road

 

9Project Allocation

600,000

10(Base Project Allocation - $600,000)

 

11(B) Rehabilitate Jones Mill Run Road and
12Blue Hole Road bridges, widen roads
13and replace deck bridge with precast
14box culvert

 

15Project Allocation

600,000

16(Base Project Allocation - $600,000)

 

17(C) Replace box culvert, bridge and
18roadway on South Wolfe Rock Road

 

19Project Allocation

800,000

20(Base Project Allocation - $800,000)

 

21(ii) Gallitzin State Forest

 

22(A) Replace culvert at Shade Road over
23unnamed tributary to Shade Creek

 

24Project Allocation

250,000

25(Base Project Allocation - $250,000)

 

26(14) Sullivan County

 

27(i) Loyalsock State Forest

 

28(A) Rehabilitate Yellow Dog Road over
29Rock Run - No. 0017

 

30Project Allocation

350,000

1(Base Project Allocation - $350,000)

 

2(B) Rehabilitate Hillsgrove Road over
3tributary to Pleasant Stream, No. 12-
49018

 

5Project Allocation

250,000

6(Base Project Allocation - $250,000)

 

7(C) Replace Bridge No. 20-9011, High Knob
8Road over Ketchum Run

 

9Project Allocation

250,000

10(Base Project Allocation - $250,000)

 

11(D) Replace bridge on Rock Run Road over
12Loyalsock Creek

 

13Project Allocation

300,000

14(Base Project Allocation - $300,000)

 

15(15) Tioga County

 

16(i) Tioga State Forest

 

17(A) Replace bridge on Cedar Mountain Road
18over Cedar Mountain Run

 

19Project Allocation

300,000

20(Base Project Allocation - $300,000)

 

21(B) Replace bridge on Owasee Road over
22Chimney Hollow

 

23Project Allocation

175,000

24(Base Project Allocation - $175,000)

 

25(C) Replace bridge on Spoor Hollow Road
26over Norris Brook

 

27Project Allocation

325,000

28(Base Project Allocation - $325,000)

 

29(D) Replace bridge on Landrus Road over
30South Creek

 

1Project Allocation

325,000

2(Base Project Allocation - $325,000)

 

3(16) Union County

 

4(i) Bald Eagle State Forest

 

5(A) Replace bridge on Bear Run Road over
6Bear Run Creek

 

7Project Allocation

250,000

8(Base Project Allocation - $250,000)

 

9(17) Westmoreland County

 

10(i) Forbes State Forest

 

11(A) Replace bridge on South Wolfe Rock
12Road over tributary to Tub Mill Run
13and bridge on South Wolfe Rock Road
14over Tub Mill Run

 

15Project Allocation

600,000

16(Base Project Allocation - $600,000)

 

17Section 10. Itemization of State ATV/Snowmobile Fund current
18revenue projects.

19Projects in the category of State ATV/Snowmobile Fund
20projects to be constructed by the Department of Conservation and
21Natural Resources, its successors or assigns, and to be financed
22from State ATV/Snowmobile Fund current revenue are hereby
23itemized, together with their respective estimated costs, as
24follows:

25 

26Project

Total Project
Allocation

27(1) Monroe County

 

28(i) Delaware State Forest

 

29(A) Construct or rehabilitate ATV trail
30in Dixon Miller Recreation Area

 

1Project Allocation

250,000

2(Base Project Allocation - $250,000)

 

3Section 11. Itemization of Pennsylvania Fish and Boat
4Commission capital projects.

5The individual capital projects in the category of public
6improvements projects to be acquired or developed by the
7Pennsylvania Fish and Boat Commission and to be financed by the
8incurring of debt or by the current revenues of the Fish Fund
9and the Boat Fund pursuant to executive authorizations are
10hereby itemized, together with their respective estimated costs,
11as follows:

12 

13Project

Total Project
Allocation

14(1)  Pennsylvania Fish and Boat Commission

 

<-15(i)  Beaver County

 

16(A)  Construction and other related costs
17for the Hereford Manor Dams

 

18Project Allocation

7,500,000

19(i) (i.1)<-  Berks County

 

20(A)  Design, permit and construct a
21rehabilitated dam to meet current dam
22safety requirements, Kaercher Creek
23(PA 478)

 

24Project Allocation

5,063,000

25(ii)  Bucks County

 

26(A)  Design, permit and construct a
27rehabilitated dam to meet current dam
28safety requirements, Levittown Lake

 

29Project Allocation

1,875,000

30(iii)  Cambria County

 

1(A)  Design, permit and construct a
2rehabilitated dam to meet current dam
3safety requirements, Duman Lake

 

4Project Allocation

1,875,000

5(iv) Carbon County

 

6(A)  Additional funds to design, permit
7and construct a rehabilitated dam to
8meet current dam safety requirements,
9Mauch Chunk Lake (PA 462)

 

10Project Allocation

5,625,000

11(v)  Centre County

 

12(A)  Design, permit and breach Gap Dam

 

13Project Allocation

250,000

14(B)  Additional funds to construct a dam
15in the vicinity of Colyer Lake to meet
16current dam safety requirements

 

17Project Allocation

3,140,000

18(C)  Additional funds to replace or
19remodel Pleasant Gap Regional Office
20Buildings

 

21Project Allocation

2,375,000

22(D)  Additional funds to design,
23rehabilitate and construct buildings,
24effluent treatment and related
25infrastructure at Pleasant Gap

 

26Project Allocation

3,013,000

27(E)  Additional funds to design,
28rehabilitate and construct buildings,
29effluent treatment and related
30infrastructure at Benner Spring

 

1Project Allocation

5,044,000

2(F)  Additional funds to design,
3rehabilitate and construct buildings,
4effluent treatment and related
5infrastructure at Bellefonte

 

6Project Allocation

5,375,000

7(vi)  Columbia County

 

8(A)  Additional funds to design, permit
9and construct a rehabilitated dam to
10meet current dam safety requirements,
11Briar Creek Lake (PA 497)

 

12Project Allocation

6,875,000

13(vii)  Crawford County

 

14(A)  Additional funds to design, permit
15and construct a rehabilitated dam to
16meet current dam safety requirements,
17Tamarack Lake

 

18Project Allocation

11,097,000

19(viii) Cumberland County

 

20(A)  Design, permit and construct a
21rehabilitated dam to meet current dam
22safety requirements, Shaffer Mill Dam

 

23Project Allocation

625,000

24(B)  Design, permit and construct a
25rehabilitated dam to meet current dam
26safety requirements, Springfield
27Reservoir

 

28Project Allocation

625,000

29(ix) Erie County

 

30(A)  Design, permit and construct a

 

1rehabilitated dam to meet current dam
2safety requirements, Hatchery Dam

 

3Project Allocation

625,000

4(B)  Additional funds to design,
5rehabilitate and construct buildings,
6effluent treatment and related
7infrastructure at Fairview

 

8Project Allocation

734,000

9(C)  Design, permit and construct marina,
10outbuilding and effluent treatment
11facility improvements at Northeast

 

12Project Allocation

10,625,000

13(x) Fulton County

 

14(A)  Additional funds to design, permit
15and construct a rehabilitated dam to
16meet current dam safety requirements,
17Meadow Grounds Dam

 

18Project Allocation

2,188,000

19(xi) Indiana County

 

20(A)  Additional funds to design, permit
21and construct a rehabilitated dam to
22meet current dam safety requirements,
23Hemlock Lake (Straight Run Dam)

 

24Project Allocation

3,438,000

25(xii) Juniata County

 

26(A)  Additional funds to design,
27rehabilitate and construct fish-
28rearing facilities and related
29infrastructure, Van Dyke

 

30Project Allocation

2,875,000

1(xiii) Luzerne County

 

2(A)  Design, permit and breach the Mt.
3Springs 2 Dam

 

4Project Allocation

250,000

5(B)  Design, permit and construct a
6rehabilitated dam to meet current dam
7safety requirements, Lily Lake

 

8Project Allocation

313,000

9(C)  Additional funds to design, permit
10and construct a rehabilitated dam to
11meet current dam safety requirements,
12Harris Pond Dam

 

13Project Allocation

2,625,000

14(xiv) Lycoming County

 

15(A)  Additional funds to design, permit
16and construct a rehabilitated dam to
17meet current dam safety requirements,
18Rose Valley Lake

 

19Project Allocation

3,438,000

20(xv) Northampton County

 

21(A)  Additional funds to design, permit
22and construct a rehabilitated dam to
23meet current dam safety requirements,
24East Bangor Lake

 

25Project Allocation

557,000

26(xvi) Snyder County

 

27(A)  Additional funds to design, permit
28and construct a rehabilitated dam to
29meet current dam safety requirements,
30Walker Lake (PA 637)

 

1Project Allocation

7,688,000

2(xvii) Somerset County

 

3(A)  Additional funds to design, permit
4and construct a rehabilitated dam to
5meet current dam safety requirements,
6Somerset Lake

 

7Project Allocation

1,700,000

8(B)  Design, permit and construct a
9rehabilitated dam to meet current dam
10safety requirements, High Point Lake

 

11Project Allocation

8,250,000

12(xviii) Sullivan County

 

13(A)  Design, permit and construct a
14rehabilitated dam to meet current dam
15safety requirements, Hunters Lake
16Recreation Dam

 

17Project Allocation

1,250,000

18(xix) Susquehanna County

 

19(A)  Design, permit and construct a
20rehabilitated dam to meet current dam
21safety requirements, Stump Pond Dam
22(Purdy)

 

23Project Allocation

625,000

24(xx) Tioga County

 

25(A)  Additional funds to design, permit
26and construct a rehabilitated dam to
27meet current dam safety requirements,
28Beechwood Lake (PA 454)

 

29Project Allocation

6,188,000

30(xxi) Venango County

 

1(A)  Additional funds to design, permit
2and construct a rehabilitated dam to
3meet current dam safety requirements,
4Kahle Lake

 

5Project Allocation

4,825,000

6(xxii) Warren County

 

7(A)  Design, permit and construct a
8rehabilitated dam to meet current dam
9safety requirements, Browns Pond

 

10Project Allocation

625,000

11(xxiii) Wayne County

 

12(A)  Design, permit and construct a
13rehabilitated dam to meet current dam
14safety requirements, Douglas Pond

 

15Project Allocation

625,000

16(B)  Design, permit and construct a
17rehabilitated dam to meet current dam
18safety requirements, Long Pond

 

19Project Allocation

625,000

20(C)  Additional funds to permit and
21construct a rehabilitated dam to meet
22current dam safety requirements,
23Belmont Lake

 

24Project Allocation

1,188,000

25(D)  Additional funds to design, permit
26and construct a rehabilitated dam to
27meet current dam safety requirements,
28Lower Woods Pond

 

29Project Allocation

1,188,000

30(E)  Design, permit and construct a

 

1rehabilitated dam to meet current dam
2safety requirements, Miller Pond

 

3Project Allocation

6,563,000

4(F)  Design, permit and construct a
5rehabilitated dam to meet current dam
6safety requirements, White Oak Pond

 

7Project Allocation

6,563,000

8(xxiv) Wyoming County

 

9(A)  Design, permit and construct a
10rehabilitated dam to meet current dam
11safety requirements, Winola Lake

 

12Project Allocation

313,000

13Section 12. Itemization of Manufacturing Fund current revenue
14projects.

15The individual capital projects in the category of public
16improvement projects to be developed by the Department of
17General Services, its successors or assigns, for the Department
18of Corrections, and to be financed from current revenues of the
19Manufacturing Fund are hereby itemized, together with their
20respective estimated costs, as follows:

21 

22Project

Total Project

Allocation

23(1) Department of Corrections

 

24(i) State Correctional Institution at Forest

 

25(A) Interior construction of Correctional
26Institute building to provide for

27correctional incentives program

 

28Project Allocation

7,500,000

29(Base Project Allocation - $6,000,000)

 

30(Design & Contingencies - $1,500,000)

 

1Section 13. Itemization of Oil and Gas Lease Fund capital
2projects.

3The individual capital projects in the category of public
4improvement projects to be developed by the Department of
5Conservation and Natural Resources, its successors or assigns,
6and to be financed from current revenues of the Oil and Gas
7Lease Fund are hereby itemized, together with their respective
8estimated costs, as follows:

9 

10Project

Total Project
Allocation

11(1) Department of Conservation and Natural
12Resources

 

13(i) Codorus State Park

 

14(A) Construction of camping cottages
15within park

 

16Project Allocation

150,000

17(Base Project Allocation - $150,000)

 

18(ii) Ricketts Glen State Park

 

19(A) Construction of camping cottages
20within park

 

21Project Allocation

548,000

22(Base Project Allocation - $548,000)

 

23Section 14. Itemization of Environmental Stewardship Fund
24capital projects.

25The individual projects to be developed by the Department of
26Conservation and Natural Resources, its successors or assigns,
27and to be financed from current revenues of the Environmental
28Stewardship Fund are hereby itemized, together with their
29respective estimated costs, as follows:

30 

 

1Project

Total Project




Allocation

2(1) Department of Conservation and Natural
3Resources

 

4(i) Ridley Creek State Park

 

5(A) Construct equestrian riding facility

 

6Project Allocation

900,000

7(Base Project Allocation - $900,000)

 

<-8Section 15. Itemization of highway bridge projects.

9The individual capital projects in the category of highway
10bridge projects to be constructed by the Department of
11Transportation, its successors or assigns, and to be financed
12from current revenues or by the incurring of debt are hereby
13itemized, together with their respective estimated costs, as
14follows:

15 

16Project

Total Project
Allocation

17(1) Northumberland County

 

18(i) Local bridges (Reserved).

 

19(ii) State bridges

 

20(A) Tenth Street Bridge in Trevorton over
21Zerbe Run, Zerbe Township, Bridge
22Replacement

 

23Project Allocation

190,000

24(Base Project Allocation - $190,000)

 

25Section 15.1. Itemization of State Stores Fund current revenue<-
26projects.

27The individual capital projects in the category of public
28improvement projects to be developed by the Department of
29General Services, it successors or assigns, for the Pennsylvania
30Liquor Control Board, and to be financed from current revenues

1of the State Stores Fund are hereby itemized with their
2respective itemized costs as follows:

3 

4Project

Total Project
Allocation

5(1) Pennsylvania Liquor Control Board

 

6(i) Northwest Office Building

 

7(A) Replace security and fire detection
8systems at Northwest Office Building
9located on Forster Street

 

10Project Allocation

1,500,000

11(Base Project Allocation - $1,350,000)

 

12(Design & Contingencies - $150,000)

 

13(B) Install replacement windows
14throughout Northwest Office Building
15located at Forster Street

 

16Project Allocation

1,500,000

17(Base Project Allocation - $1,200,000)

 

18(Design & Contingencies - $300,000)

 

19(C) Masonry repointing and exterior
20repairs of Northwest Office Building
21located on Forster Street

 

22Project Allocation

1,000,000

23(Base Project Allocation - $900,000)

 

24(Design & Contingencies - $100,000)

 

25Section 16. Provisions relating to highway bridge projects.

26(a) Limitation on expenditure of funds.--The following shall
27apply to itemizations under section 15:

28(1) Any moneys derived from the incurring of debt shall
29be used solely for effecting the rehabilitation, replacement
30or removal of bridges located on State highways. All other

1bridge rehabilitation, replacement or removal shall be
2financed from current revenue.

3(2) Notwithstanding any law to the contrary, the
4projects itemized in the act of December 8, 1982 (P.L.848,
5No.235), known as the Highway-Railroad and Highway Bridge
6Capital Budget Act for 1982-1983, may be financed from
7current revenue.

8(b) Allocation of funds.--As follows:

9(1) Whenever the Department of Transportation determines
10that the full estimated financial costs of the projects
11itemized in section 15 are not necessary for the proper
12design, acquisition or construction of such projects, the
13excess funds no longer required may be allocated by the
14Department of Transportation to increase the estimated costs
15of any one or more of the projects specifically itemized in a
16capital budget.

17(2) Moneys raised or expended by municipalities after
18the effective date of this act, in anticipation of receipt of
19funds authorized for projects itemized by this act, may be
20reimbursable to those municipalities.

21(c) Policy on jobs and materials.--As follows:

22(1) It is the declared policy of the Commonwealth that
23the construction projects authorized in section 15 be used,
24to the greatest extent possible, to provide for the creation
25of jobs and the rehiring of the unemployed in this
26Commonwealth. In order to reach this goal, firms with
27Commonwealth-based facilities shall be actively solicited to
28make bids on contracts to furnish products and materials,
29including, but not limited to, steel and steel products, to
30be used in these projects.

1(2) Every contract document entered into to undertake a
2project contained in section 15 shall provide that any steel
3or other products to be used or supplied in the performance
4of this contract shall be required to be manufactured by
5plants in the United States unless the secretary determines,
6on a contract-by-contract basis, that certain required
7products are not produced in the United States in sufficient
8quantities to meet the requirements of the contract. Such a
9determination and the reasons for the determination shall be
10published in the Pennsylvania Bulletin. Decisions made under
11this subsection shall not be inconsistent with the general
12provisions of the act of March 3, 1978 (P.L.6, No.3), known
13as the Steel Products Procurement Act.

14(3) Minorities and women.--It is also the declared
15policy of the Commonwealth to require and encourage
16substantial participation by minorities and women in the
17construction projects authorized in section 15.

18(d) Payment of capital debt service.--The repayment of any 
19debt incurred pursuant to section 15 shall be made from the 
20Highway Bridge Improvement Restricted Account and such repayment 
21shall have first claim on the revenues of the account.

22(e) Authorization and debt cumulation.--The additional
23authorization and debt allowance provided for in section 15
24shall be added to the total authorizations and debt incurred
25pursuant to the act of December 8, 1982 (P.L.848, No.235), known
26as the Highway-Railroad and Highway Bridge Capital Budget Act
27for 1982-1983, as amended and supplemented. Section 15 shall be
28construed as a supplement to the Highway-Railroad and Highway
29Bridge Capital Budget Act for 1982-1983.

30Section <-15 17. Debt authorization.

1(a) Public improvements.--The Governor, Auditor General and
2State Treasurer are hereby authorized and directed to borrow
3from time to time in addition to any authorization heretofore or
4hereafter enacted, on the credit of the Commonwealth, subject to
5the limitations provided in the current capital budget, money
6not exceeding in the aggregate the sum of $3,572,285,000<- 
7$3,897,449,000 $3,977,449,000 $4,664,749,000 as may be found
8necessary to carry out the acquisition and construction of the
9public improvement projects specifically itemized in a capital
10budget.

11(b) Furniture and equipment.--The Governor, Auditor General
12and State Treasurer are hereby authorized and directed to borrow
13from time to time in addition to any authorization heretofore or
14hereafter enacted, on the credit of the Commonwealth, subject to
15the limitations provided in the current capital budget, money
16not exceeding in the aggregate the sum of $137,620,000<- 
17$138,120,000 $150,120,000 $165,120,000 as may be found necessary
18to carry out the acquisition and construction of the public
19improvement projects consisting of the acquisition of original
20movable furniture and equipment specifically itemized in a
21capital budget.

22(c) Transportation assistance.--The Governor, Auditor
23General and State Treasurer are hereby authorized and directed
24to borrow from time to time in addition to any authorization
25heretofore or hereafter enacted, on the credit of the
26Commonwealth, subject to the limitations provided in the current
27capital budget, money not exceeding in the aggregate the sum of
28$1,718,429,000 $1,823,639,000 $1,846,939,000 $1,939,709,000 as
29may be found necessary to carry out the acquisition and
30construction of the transportation assistance projects

1specifically itemized in a capital budget.

2(d) Redevelopment assistance.--Subject to the limitation in
3section 317(b) of the act of February 9, 1999 (P.L.1, No.1), 
4known as the Capital Facilities Debt Enabling Act, the Governor, 
5Auditor General and State Treasurer are hereby authorized and 
6directed to borrow from time to time in addition to any 
7authorization heretofore or hereafter enacted, on the credit of 
8the Commonwealth, subject to the limitations provided in the 
9current capital budget, money not exceeding in the aggregate the 
10sum of $3,965,614,000 $6,077,447,000 $6,438,618,000 
11$6,74<-4,668,000 as may be found necessary to carry out the 
12redevelopment assistance capital projects specifically itemized 
13in a capital budget.

14(e) Flood control.--The Governor, Auditor General and State
15Treasurer are hereby authorized and directed to borrow from time
16to time in addition to any authorization heretofore or hereafter
17enacted, on the credit of the Commonwealth, subject to the
18limitations provided in the current capital budget, money not
19exceeding in the aggregate the sum of $78,702,000<- $127,852,000 
20$137,852,000 as may be found necessary to carry out the
21acquisition and construction of the flood control projects
22specifically itemized in a capital budget.

23(f) Pennsylvania Fish and Boat Commission projects.--The
24Governor, Auditor General and State Treasurer are hereby
25authorized and directed to borrow from time to time in addition
26to any authorization heretofore or hereafter enacted, on the
27credit of the Commonwealth, subject to the limitations provided
28in the current capital budget, money not exceeding in the
29aggregate the sum of $128,741,000<- $136,241,000 as may be found
30necessary to carry out the acquisition and construction of the

1Pennsylvania Fish and Boat Commission projects specifically
2itemized in a capital budget.

<-3(g) Highway bridge projects.--The Governor, Auditor General
4and State Treasurer are hereby authorized and directed to borrow
5from time to time, in addition to any authorization heretofore
6or hereafter enacted, on the credit of the Commonwealth, subject
7to the limitations provided in the current capital budget, money
8not exceeding in the aggregate the sum of $190,000 as may be
9found necessary to carry out the acquisition and construction of
10the State projects specifically itemized in a capital budget.

11Section <-16 18. Issue of bonds.

12The indebtedness authorized in this act shall be incurred
13from time to time and shall be evidenced by one or more series
14of general obligation bonds of the Commonwealth in such
15aggregate principal amount for each series as the Governor, the
16Auditor General and the State Treasurer shall determine, but the
17latest stated maturity date shall not exceed estimated useful
18life of the projects being financed as stated in section <-14 19.

19Section <-17 19. Estimated useful life and term of debt.

20(a) Estimated useful life.--The General Assembly states that
21the estimated useful life of the public improvement projects
22itemized in this act is as follows:

23(1) Public improvement projects, 30 years.

24(2) Furniture and equipment projects, 10 years.

25(3) Transportation assistance projects:

26(i) Rolling stock, 15 years.

27(ii) Passenger buses, 12 years.

28(iii) Furniture and equipment, 10 years.

29(iv) All others, 30 years.

30(b) Term of debt.--The maximum term of the debt authorized

1to be incurred under this act is 30 years.

2Section <-18 20. Appropriations.

3(a) Public improvements.--The net proceeds of the sale of
4the obligations authorized in this act are hereby appropriated
5from the Capital Facilities Fund to the Department of General
6Services in the maximum amount of <-$3,572,285,000 $3,897,449,000 
<-7$3,977,449,000 $4,664,749,000 to be used by it exclusively to
8defray the financial cost of the public improvement projects
9specifically itemized in a capital budget. After reserving or
10paying the expenses of the sale of the obligation, the State
11Treasurer shall pay to the Department of General Services the
12moneys as required and certified by it to be legally due and
13payable.

14(b) Furniture and equipment.--The net proceeds of the sale
15of the obligations authorized in this act are hereby
16appropriated from the Capital Facilities Fund to the Department
17of General Services in the maximum amount of $137,620,000<- 
18$138,120,000 $150,120,000 $165,120,000<- to be used by it
19exclusively to defray the financial cost of the public
20improvement projects consisting of the acquisition of original
21movable furniture and equipment specifically itemized in a
22capital budget. After reserving or paying the expenses of the
23sale of the obligation, the State Treasurer shall pay to the
24Department of General Services the moneys as required and
25certified by it to be legally due and payable.

26(c) Transportation assistance.--The net proceeds of the sale
27of the obligations authorized in this act are hereby
28appropriated from the Capital Facilities Fund to the Department
29of Transportation in the maximum amount of $1,718,429,000<- 
30$1,<-823,639,000 $1,846,939,000 $1,931,709,000 to be used by it

1exclusively to defray the financial cost of the transportation
2assistance projects specifically itemized in a capital budget.
3After reserving or paying the expenses of the sale of the
4obligation, the State Treasurer shall pay to the Department of
5Transportation the moneys as required and certified by it to be
6legally due and payable.

7(d) Redevelopment assistance.--The net proceeds of the sale
8of the obligations authorized in this act are hereby
9appropriated from the Capital Facilities Fund to the Department
10of Community and Economic Development in the maximum amount of
<-11$3,965,614,000 $6,077,447,000 $6,438,618,000 $6,744,668,000 to
12be used by it exclusively to defray the financial cost of the
13redevelopment assistance capital projects specifically itemized
14in a capital budget. After reserving or paying the expenses of
15the sale of the obligation, the State Treasurer shall pay to the
16Department of Community and Economic Development the moneys as
17required and certified by it to be legally due and payable.

18(e) Flood control.--The net proceeds of the sale of the
19obligations authorized in this act are hereby appropriated from
20the Capital Facilities Fund to the Department of Environmental
21Protection in the maximum amount of <-$78,702,000 $127,852,000 
22$137,852,<-000 to be used by it exclusively to defray the
23financial cost of the flood control projects specifically
24itemized in a capital budget. After reserving or paying the
25expenses of the sale of the obligation, the State Treasurer
26shall pay to the Department of Environmental Protection the
27moneys as required and certified by it to be legally due and
28payable.

29(f) Pennsylvania Fish and Boat Commission projects.--The net
30proceeds of the sale of the obligations authorized in this act

1are hereby appropriated from the Capital Facilities Fund to the
2Pennsylvania Fish and Boat Commission in the maximum amount of
<-3$128,741,000 $136,241,000 to be used by it exclusively to defray
4the financial cost of the Pennsylvania Fish and Boat Commission
5projects specifically itemized in a capital budget. After
6reserving or paying the expenses of the sale of the obligation,
7the State Treasurer shall pay to the Pennsylvania Fish and Boat
8Commission the moneys as required and certified by it to be
9legally due and payable.

<-10(g) Highway bridge projects.--The net proceeds of the sale
11of the obligations authorized in this act are hereby
12appropriated from the Capital Facilities Fund to the Department
13of Transportation in the maximum amount of $190,000 to be used
14by it exclusively to defray the financial costs of the highway
15bridge projects specifically itemized in this capital budget.
16After reserving or paying the expenses of the sale of the
17obligation, the State Treasurer shall pay out to the department
18the moneys as required and certified by it to be legally due and
19payable.

20Section <-19 21. Federal funds.

21(a) Projects itemized in this act.--In addition to those
22funds appropriated in section <-18 20, all moneys received from
23the Federal Government for the projects specifically itemized in
24this act are also hereby appropriated for those projects.

25(b) Projects not requiring itemization.--Department of
26Military and Veterans Affairs construction projects which are
27totally federally funded but which are to be administered by the
28Department of General Services are hereby authorized.

<-29Section 22. Delegation.

30For the public improvement projects specifically itemized in

1section 3(b)(2), the Department of General Services may delegate
2the authority to construct, improve, equip, furnish, maintain,
3acquire or operate such projects to the Philadelphia Regional
4Port Authority. Notwithstanding any provision of law to the
5contrary, the Philadelphia Regional Port Authority, at its
6discretion and subsequent to the aforementioned delegation, may
7contract with one or more of the tenant companies leasing or
8operating port facilities at the Port of Philadelphia for the
9purpose of constructing, improving, equipping, furnishing,
10maintaining, acquiring or operating the public improvement
11projects specifically itemized in section 3(b)(2). Any project
12itemized in section 3(b)(2) delegated to the Philadelphia
13Regional Port Authority for the purpose of constructing,
14improving, equipping, furnishing, maintaining, acquiring or
15operating the project shall be exempt from the section 1 first
16paragraph of the act of May 1, 1913 (P.L.155, No.104), referred 
17to as the Separations Act, and the provisions of the act of 
18March 3, 1978 (P.L.6, No.3), known as the Steel Products 
19Procurement Act, and any provisions of the law requiring the 
20bidding of projects.

21Section <-20 22 23. Editorial changes.

22In editing and preparing this act for printing following the
23final enactment, the Legislative Reference Bureau shall insert
24or revise letters or numbers for projects where the letters or
25numbers are missing or require revision. The bureau shall also
26revise the total monetary amounts for the total authorization,
27debt authorization, appropriations and departmental totals as
28necessary to agree with the total monetary amounts of the
29projects.

30Section <-21 23 24. Effective date.

1This act shall take effect immediately.