AN ACT

 

1Providing for the capital budget for the fiscal year 2012-2013;
2itemizing public improvement projects, furniture and
3equipment projects, transportation assistance projects,
4redevelopment assistance capital projects, flood control
5projects, Keystone Recreation, Park and Conservation Fund
6projects, State forestry bridge projects, State
7ATV/Snowmobile Fund projects and Manufacturing Fund projects
8to be constructed or acquired or assisted by the Department
9of General Services, the Department of Community and Economic
10Development, the Department of Conservation and Natural
11Resources, the Department of Environmental Protection or the
12Department of Transportation, together with their estimated
13financial costs; authorizing the incurring of debt without
14the approval of the electors for the purpose of financing the
15projects to be constructed, acquired or assisted by the
16Department of General Services, the Department of Community
17and Economic Development, the Department of Conservation and
18Natural Resources, the Department of Environmental Protection
19or the Department of Transportation; stating the estimated
20useful life of the projects; and making appropriations.

21The General Assembly of the Commonwealth of Pennsylvania
22hereby enacts as follows:

23Section 1. Short title.

24This act shall be known and may be cited as the Capital
25Budget Project Itemization Act of 2012-2013.

26Section 2. Total authorizations.

1(a) Public improvements.--The total authorization for the
2additional capital projects in the category of public
3improvement projects itemized in section 3 and to be acquired or
4constructed by the Department of General Services, its
5successors or assigns, and to be financed by the incurring of
6debt, shall be $2,312,964,000.

7(b) Furniture and equipment.--The total authorization for
8the additional capital projects in the category of public
9improvement projects consisting of the acquisition of original
10movable furniture and equipment to complete public improvement
11projects itemized in section 4 and to be acquired by the
12Department of General Services, its successors or assigns, and
13to be financed by the incurring of debt, shall be $104,300,000.

14(c) Transportation assistance.--The total authorization for
15the capital projects in the category of transportation
16assistance projects itemized in section 5 with respect to which
17an interest is to be acquired in or constructed by the
18Department of Transportation, its successors or assigns, and to
19be financed by the incurring of debt, shall be $1,314,124,000.

20(d) Redevelopment assistance.--The total authorization for
21the capital projects in the category of redevelopment assistance
22capital projects itemized in section 6 for capital grants by the
23Department of Community and Economic Development, its successors
24or assigns, and to be financed by the incurring of debt, shall
25be $3,181,261,000.

26(e) Flood control.--The total authorization for the capital
27projects in the category of flood control projects itemized in
28section 7 and to be constructed by the Department of
29Environmental Protection, its successors or assigns, and to be
30financed by the incurring of debt, shall be $73,702,000.

1(f) Keystone Recreation, Park and Conservation Fund.--The
2total authorization for the capital projects in the category of
3public improvement projects itemized in section 8 and to be
4constructed by the Department of Conservation and Natural
5Resources, its successors or assigns, and to be financed from
6current revenues in the Keystone Recreation, Park and
7Conservation Fund, shall be $53,783,000.

8(g) State forestry bridge projects.--The total authorization
9for the capital projects itemized in section 9 to be constructed
10by the Department of Conservation and Natural Resources, its
11successors or assigns, and to be financed by oil company
12franchise tax revenues pursuant to 75 Pa.C.S. § 9502(a)(2)(iv)
13(relating to imposition of tax), shall be $22,680,000.

14(h) State ATV/snowmobile projects.--The total authorization
15for the capital projects itemized in section 10 to be
16constructed by the Department of Conservation and Natural
17Resources, its successors or assigns, and to be financed from
18current revenues in the State ATV/Snowmobile Fund, shall be
19$750,000.

20(i) Manufacturing Fund current revenue projects.--The total
21authorization for the capital projects in the category of public
22improvement projects itemized in section 11 and to be
23constructed by the Department of General Services, its
24successors or assigns, and to be financed from current revenues
25in the Manufacturing Fund, shall be $7,500,000.

26Section 3. Itemization of public improvement capital projects.

27(a) General rule.--Additional capital projects in the
28category of public improvement projects to be constructed or
29acquired by the Department of General Services, its successors
30or assigns, and to be financed by the incurring of debt, are

1hereby itemized, together with their respective estimated
2financial costs, as follows:

3 

4Project

Total Project

Allocation

5(1) Department of Agriculture

 

6(i) Farm Show Complex

 

7(A) Upgrade Farm Show Complex, including 
8new entrance to Expo Hall with meeting 
9rooms and covered walkway

 

10Project Allocation

3,000,000

11(Base Project Allocation - $3,000,000)

 

12(B) Repave parking lot adjacent to
13Elmerton Avenue lot

 

14Project Allocation

2,000,000

15(Base Project Allocation - $2,000,000)

 

16(C) Construct new parking garage to
17accommodate increased patronage during
18large show events

 

19Project Allocation

10,000,000

20(Base Project Allocation -
21$10,000,000)

 

22(ii) Health Diagnostic Laboratory

 

23(A) Construct new plant industry
24laboratory in Harrisburg to satisfy
25modern testing procedures

 

26Project Allocation

10,000,000

27(Base Project Allocation -
28$10,000,000)

 

29(B) Construct new Pennsylvania Equine
30Toxicology and Research Laboratory on

 

1New Bolton Campus of The University of
2Pennsylvania

 

3Project Allocation

7,000,000

4(Base Project Allocation - $7,000,000)

 

5(2) Department of Conservation and Natural
6Resources

 

7(i) Black Moshannon State Park

 

8(A) Develop ten additional family cabins
9with vehicle access and connection of
10utilities

 

11Project Allocation

3,000,000

12(Base Project Allocation - $2,400,000)

 

13(Design & Contingencies - $600,000)

 

14(ii) Blue Knob State Park

 

15(A) Replace two office buildings and
16combine into one modern office
17building

 

18Project Allocation

2,400,000

19(Base Project Allocation - $2,400,000)

 

20(iii) Caledonia State Park

 

21(A) Rehabilitate campground restrooms and
22shower houses with modern facilities

 

23Project Allocation

3,000,000

24(Base Project Allocation - $3,000,000)

 

25(B) Replace water lines throughout park

 

26Project Allocation

900,000

27(Base Project Allocation - $900,000)

 

28(iv) Cherry Springs State Park

 

29(A) Construct visitors and administrative
30center to accommodate increased park

 

1usage

 

2Project Allocation

8,000,000

3(Base Project Allocation - $8,000,000)

 

4(v) Codorus State Park

 

5(A) Rehabilitate and pave roads and
6parking lots for visitor safety

 

7Project Allocation

2,400,000

8(Base Project Allocation - $2,400,000)

 

9(vi) Colonel Denning State Park

 

10(A) Replace pit restroom, add sewer lines
11and replace campground restrooms and
12shower houses with modern facilities

 

13Project Allocation

1,800,000

14(Base Project Allocation - $1,800,000)

 

15(vii) Cowans Gap State Park

 

16(A) Construct park office addition and
17maintenance building addition

 

18Project Allocation

1,200,000

19(Base Project Allocation - $1,200,000)

 

20(viii) Delaware Canal State Park

 

21(A) Provide for repair and ongoing
22maintenance of Delaware Canal

 

23Project Allocation

10,000,000

24(Base Project Allocation -
25$10,000,000)

 

26(ix) Denton Hill State Park

 

27(A) Rehabilitate park, including ski
28lodge, ski lifts, snowmaking
29equipment, roads, parking lots, modern
30cabins and maintenance facilities for

 

1a four-season operation

 

2Project Allocation

12,000,000

3(Base Project Allocation -
4$12,000,000)

 

5(x) Forest District 10

 

6(A) Replace failed acid mine drainage
7treatment system to reduce pollutants
8in Kettle Creek watershed

 

9Project Allocation

2,000,000

10(Base Project Allocation - $2,000,000)

 

11(xi) Forest District 11

 

12(A) Construct bridge over Lehigh River to
13provide public and administrative
14access to Blue Ridge Tract of
15Lackawanna State Forest with public
16parking

 

17Project Allocation

3,500,000

18(Base Project Allocation - $3,500,000)

 

19(xii) Forest District 12

 

20(A) Construct bridge over Slate Run

 

21Project Allocation

1,000,000

22(Base Project Allocation - $1,000,000)

 

23(B) Demolish old building and build
24public restrooms and contact station
25on Pine Creek Rail Trail

 

26Project Allocation

4,500,000

27(Base Project Allocation - $4,500,000)

 

28(xiii) Forest District 13

 

29(A) Remediate and reclaim acid mine
30drainage pollution source on

 

1Commonwealth's land into Little Dents
2Run watershed

 

3Project Allocation

8,000,000

4(Base Project Allocation - $8,000,000)

 

5(xiv) Forest District 14

 

6(A) Locate, plug and retire abandoned oil
7and gas wells on State forest land

 

8Project Allocation

2,000,000

9(Base Project Allocation - $2,000,000)

 

10(xv) Gifford Pinchot State Park

 

11(A) Replace water lines which are in
12continual need of repair

 

13Project Allocation

1,560,000

14(Base Project Allocation - $1,560,000)

 

15(B) Repave main road, including drainage

 

16Project Allocation

780,000

17(Base Project Allocation - $780,000)

 

18(xvi) Greenwood Furnace State Park

 

19(A) Construct new maintenance building to
20meet modern codes

 

21Project Allocation

1,800,000

22(Base Project Allocation - $1,800,000)

 

23(xvii) Hickory Run State Park

 

24(A) Construct new visitors center with
25administration facilities and comfort
26station and demolish old center

 

27Project Allocation

7,500,000

28(Base Project Allocation - $7,500,000)

 

29(B) Develop and construct family cabin
30colony within park

 

1Project Allocation

3,000,000

2(Base Project Allocation - $3,000,000)

 

3(C) Rehabilitate and upgrade office to
4accommodate personnel

 

5Project Allocation

8,000,000

6(Base Project Allocation - $8,000,000)

 

7(xviii) Kettle Creek State Park

 

8(A) Dredge lake and provide for improved
9quality recreational opportunities in
10and around Kettle Creek Reservoir

 

11Project Allocation

2,000,000

12(Base Project Allocation - $1,600,000)

 

13(Design & Contingencies - $400,000)

 

14(xix) Lackawanna State Park

 

15(A) Replace pool

 

16Project Allocation

6,000,000

17(Base Project Allocation - $4,800,000)

 

18(Design & Contingencies - $1,200,000)

 

19(xx) Laurel Mountain State Park

 

20(A) Develop Phase II of ski area, adding
21ski and visitor service, including
22support facilities, lifts and tubing
23park

 

24Project Allocation

3,000,000

25(Base Project Allocation - $3,000,000)

 

26(xxi) Maurice K. Goddard State Park

 

27(A) Replace existing marina facility with
28new structure for boat concession
29operations, public restrooms and
30meeting room space

 

1Project Allocation

2,400,000

2(Base Project Allocation - $2,400,000)

 

3(xxii) Moraine State Park

 

4(A) Upgrade sewage treatment facilities

 

5Project Allocation

5,000,000

6(Base Project Allocation - $5,000,000)

 

7(xxiii) Ohiopyle State Park

 

8(A) Develop family cabin colony with
9vehicle access and connection of
10utilities

 

11Project Allocation

3,000,000

12(Base Project Allocation - $2,400,000)

 

13(Design & Contingencies - $600,000)

 

14(xxiv) Penn Nursery and Woodshop

 

15(A) Replace outdated maintenance shop to
16meet current code requirements

 

17Project Allocation

5,500,000

18(Base Project Allocation - $5,500,000)

 

19(xxv) Point State Park

 

20(A) Connect Great Allegheny Passage Trail
21to Point State Park and rehabilitate
22flag bastion, pedestrian access and
23parking lots

 

24Project Allocation

9,000,000

25(Base Project Allocation - $9,000,000)

 

26(xxvi) Presque Isle State Park

 

27(A) Replenish sand to maintain beach

 

28Project Allocation

10,000,000

29(Base Project Allocation -
30$10,000,000)

 

1(B) Replace three beach/shower houses,
2including design, site location and
3construction

 

4Project Allocation

3,600,000

5(Base Project Allocation - $3,600,000)

 

6(xxvii) Prince Gallitzin State Park

 

7(A) Replace two pit restrooms with modern
8facilities at Wyerough and sailboat
9mooring areas

 

10Project Allocation

960,000

11(Base Project Allocation - $960,000)

 

12(B) Replace water lines throughout park

 

13Project Allocation

3,240,000

14(Base Project Allocation - $3,240,000)

 

15(C) Repave main road, including drainage
16to beach

 

17Project Allocation

2,400,000

18(Base Project Allocation - $2,400,000)

 

19(xxviii) Pymatuning State Park

 

20(A) Rehabilitate campground facilities
21for full-service hook-ups, including
22new water well, water storage tanks
23and sewage collection system

 

24Project Allocation

2,400,000

25(Base Project Allocation - $2,400,000)

 

26(xxix) Ryerson Station State Park

 

27(A) Rehabilitate dam

 

28Project Allocation

5,000,000

29(Base Project Allocation - $5,000,000)

 

30(xxx) Samuel S. Lewis State Park

 

1(A) Replace pit restroom with modern
2facilities, including onsite septic
3system

 

4Project Allocation

1,200,000

5(Base Project Allocation - $1,200,000)

 

6(xxxi) Shawnee State Park

 

7(A) Replace regional office to meet
8modern code requirements and increase
9efficiency

 

10Project Allocation

3,600,000

11(Base Project Allocation - $3,600,000)

 

12(xxxii) Shikellamy State Park

 

13(A) Replace dam bags that have reached
14their life expectancy

 

15Project Allocation

4,000,000

16(Base Project Allocation - $4,000,000)

 

17(xxxiii) Tobyhanna State Park

 

18(A) Rehabilitate Tobyhanna No. 2 dam

 

19Project Allocation

8,500,000

20(Base Project Allocation - $7,000,000)

 

21(Design & Contingencies - $1,500,000)

 

22(xxxiv) Whipple Dam State Park

 

23(A) Replace bathhouse with modern
24facility and add onsite septic system

 

25Project Allocation

1,800,000

26(Base Project Allocation - $1,800,000)

 

27(xxxv) Various Parks and Forest Districts

 

28(A) Rehabilitate or replace lookout fire
29towers throughout park system

 

30Project Allocation

6,000,000

1(Base Project Allocation - $4,800,000)

 

2(Design & Contingencies - $1,200,000)

 

3(3) Department of Corrections

 

4(i) State Correctional Institution at Albion

 

5(A) Replace various roofs throughout
6institution

 

7Project Allocation

1,200,000

8(Base Project Allocation - $960,000)

 

9(Design & Contingencies - $240,000)

 

10(B) Replace fire alarm system throughout
11institution

 

12Project Allocation

900,000

13(Base Project Allocation - $720,000)

 

14(Design & Contingencies - $180,000)

 

15(ii) State Correctional Institution at
16Cambridge Springs

 

17(A) Replace 5,260 feet of current
18perimeter security system, which is
19obsolete and no longer supported by
20the manufacturer

 

21Project Allocation

1,200,000

22(Base Project Allocation - $960,000)

 

23(Design & Contingencies - $240,000)

 

24(iii) State Correctional Institution at Camp
25Hill

 

26(A) Renovate boiler plant to repair or
27replace worn out equipment, modify
28pollution controls system and utilize
29most effective fuel source

 

30Project Allocation

4,000,000

1(Base Project Allocation - $3,200,000)

 

2(Design & Contingencies - $800,000)

 

3(iv) State Correctional Institution at
4Chester

 

5(A) Replace various roofs throughout
6institution

 

7Project Allocation

7,000,000

8(Base Project Allocation - $5,600,000)

 

9(Design & Contingencies - $1,400,000)

 

10(v) State Correctional Institution at Coal

 

11(A) Replace rubber roofing on all inmate
12housing units

 

13Project Allocation

3,500,000

14(Base Project Allocation - $2,800,000)

 

15(Design & Contingencies - $700,000)

 

16(vi) State Correctional Institution at Dallas

 

17(A) Expand existing visiting room with
18approximately 2,000-square-foot
19addition to handle increased
20visitation demands

 

21Project Allocation

400,000

22(Base Project Allocation - $320,000)

 

23(Design & Contingencies - $80,000)

 

24(vii) State Correctional Institution at
25Fayette

 

26(A) Upgrade security system, including
27door control, intercom, public address
28and perimeter security head unit for
29the institution

 

30Project Allocation

1,300,000

1(Base Project Allocation - $1,040,000)

 

2(Design & Contingencies - $260,000)

 

3(viii) State Correctional Institution at
4Forest

 

5(A) Replace 5,300 feet of current
6perimeter security system which is
7obsolete and no longer supported by
8the manufacturer

 

9Project Allocation

1,430,000

10(Base Project Allocation - $1,144,000)

 

11(Design & Contingencies - $286,000)

 

12(B) Repair or replace the HTHW (High
13Temperature Hot Water) piping
14distribution system.

 

15Project Allocation

4,000,000

16(Base Project Allocation - $3,200,000)

 

17(Design & Contingencies - $800,000)

 

18(C) Upgrade or replace institution's
19intercom system

 

20Project Allocation

700,000

21(Base Project Allocation - $560,000)

 

22(Design & Contingencies - $140,000)

 

23(ix) State Correctional Institution at
24Graterford

 

25(A) Replace 5,300 feet of current
26perimeter security system which is
27obsolete and no longer supported by
28the manufacturer

 

29Project Allocation

1,200,000

30(Base Project Allocation - $960,000)

 

1(Design & Contingencies - $240,000)

 

2(x) State Correctional Institution at
3Greensburg

 

4(A) Replace 4,224 feet of current
5perimeter security system which is
6obsolete and no longer supported by
7the manufacturer

 

8Project Allocation

750,000

9(Base Project Allocation - $600,000)

 

10(Design & Contingencies - $150,000)

 

11(xi) State Correctional Institution at
12Houtzdale

 

13(A) Replace current microwave security
14system with a buried coaxial system

 

15Project Allocation

1,020,000

16(Base Project Allocation - $816,000)

 

17(Design & Contingencies - $204,000)

 

18(B) Renovate boiler plant equipment,
19modify pollution controls systems and
20utilize most cost-effective fuel
21source available

 

22Project Allocation

2,250,000

23(Base Project Allocation - $1,800,000)

 

24(Design & Contingencies - $450,000)

 

25(xii) State Correctional Institution at
26Huntingdon

 

27(A) Replace electrical services to blocks
28and cells to meet current power demand
29requirements

 

30Project Allocation

8,500,000

1(Base Project Allocation - $6,800,000)

 

2(Design & Contingencies - $1,700,000)

 

3(xiii) State Correctional Institution at
4Laurel Highlands

 

5(A) Replace perimeter security detection
6system, including taut wire system on
7perimeter fence, and add new razor
8wire

 

9Project Allocation

2,500,000

10(Base Project Allocation - $2,000,000)

 

11(Design & Contingencies - $500,000)

 

12(xiv) State Correctional Institution at
13Mahanoy

 

14(A) Repair deteriorated face block on
15inmate housing units and repair
16infrastructure

 

17Project Allocation

15,000,000

18(Base Project Allocation -
19$12,000,000)

 

20(Design & Contingencies - $3,000,000)

 

21(B) Replace rubber roofing and metal
22roofing on all inmate housing units

 

23Project Allocation

3,800,000

24(Base Project Allocation - $3,040,000)

 

25(Design & Contingencies - $760,000)

 

26(C) Replace personal alarm system
27throughout institution

 

28Project Allocation

425,000

29(Base Project Allocation - $340,000)

 

30(Design & Contingencies - $85,000)

 

1(D) Replace block walls surrounding Level
25 housing unit exercise yard pens
3which have deteriorated from normal
4settling of structures

 

5Project Allocation

500,000

6(Base Project Allocation - $400,000)

 

7(Design & Contingencies - $100,000)

 

8(xv) State Correctional Institution at Mercer

 

9(A) Replace rubber roofing on all inmate
10housing units

 

11Project Allocation

750,000

12(Base Project Allocation - $600,000)

 

13(Design & Contingencies - $150,000)

 

14(B) Repave existing perimeter road and
15install new perimeter road along new
16perimeter fence path

 

17Project Allocation

458,000

18(Base Project Allocation - $366,000)

 

19(Design & Contingencies - $92,000)

 

20(xvi) State Correctional Institution at Muncy

 

21(A) Install new 1,000,000-gallon water
22tower and install new water line for
23municipal water service tie-in

 

24Project Allocation

3,000,000

25(Base Project Allocation - $2,400,000)

 

26(Design & Contingencies - $600,000)

 

27(B) Expand existing visiting room with
28approximately 15,000-square-foot
29addition to handle increased
30visitation demands

 

1Project Allocation

5,300,000

2(Base Project Allocation - $4,240,000)

 

3(Design & Contingencies - $1,060,000)

 

4(C) Replace 6,340 feet of current
5perimeter security system which is
6obsolete and no longer supported by
7the manufacturer

 

8Project Allocation

1,430,000

9(Base Project Allocation - $1,144,000)

 

10(Design & Contingencies - $286,000)

 

11(D) Replace existing sewer lines which
12are obsolete and causing ground water
13infiltration

 

14Project Allocation

1,875,000

15(Base Project Allocation - $1,500,000)

 

16(Design & Contingencies - $375,000)

 

17(E) Construct new admissions building and
18demolish current building

 

19Project Allocation

625,000

20(Base Project Allocation - $500,000)

 

21(Design & Contingencies - $125,000)

 

22(xvii) State Correctional Institution at Pine
23Grove

 

24(A) Replace 5,310 feet of current
25perimeter security system which is
26obsolete and no longer supported by
27the manufacturer

 

28Project Allocation

2,000,000

29(Base Project Allocation - $1,600,000)

 

30(Design & Contingencies - $400,000)

 

1(xviii) State Correctional Institution at
2Pittsburgh

 

3(A) Replace 5,520 feet of current
4perimeter security system which is
5obsolete and no longer supported by
6the manufacturer

 

7Project Allocation

1,200,000

8(Base Project Allocation - $960,000)

 

9(Design & Contingencies - $240,000)

 

10(B) Replace leaking steam and condensate
11piping from power plant to A & B
12housing units

 

13Project Allocation

565,000

14(Base Project Allocation - $452,000)

 

15(Design & Contingencies - $113,000)

 

16(xix) State Correctional Institution at
17Rockview

 

18(A) Replace and add fencing to front of
19institution

 

20Project Allocation

2,400,000

21(Base Project Allocation - $1,920,000)

 

22(Design & Contingencies - $480,000)

 

23(B) Replace existing water tank at
24institution

 

25Project Allocation

1,440,000

26(Base Project Allocation - $1,152,000)

 

27(Design & Contingencies - $288,000)

 

28(C) Replace windows in treatment building

 

29Project Allocation

2,400,000

30(Base Project Allocation - $1,920,000)

 

1(Design & Contingencies - $480,000)

 

2(D) Additional funds for DGS Project 571-
330, upgrade reservoir to meet dam
4safety regulations

 

5Project Allocation

3,518,000

6(Base Project Allocation - $2,814,000)

 

7(Design & Contingencies - $704,000)

 

8(E) Renovate boiler plant ash handling
9system to meet current regulations

 

10Project Allocation

625,000

11(Base Project Allocation - $500,000)

 

12(Design & Contingencies - $125,000)

 

13(F) Renovate exterior of main dining hall
14and auditorium building, including
15refacing and repairing of concrete and
16sealing building

 

17Project Allocation

2,000,000

18(Base Project Allocation - $1,600,000)

 

19(Design & Contingencies - $400,000)

 

20(G) Renovate exterior of deputy warden's
21building, including refacing and
22repairing of concrete and sealing
23building

 

24Project Allocation

1,000,000

25(Base Project Allocation - $800,000)

 

26(Design & Contingencies - $200,000)

 

27(xx) State Correctional Institution at
28Smithfield

 

29(A) Renovate boilers and equipment,
30modify pollution controls and provide

 

1effective fuel source

 

2Project Allocation

3,500,000

3(Base Project Allocation - $2,800,000)

 

4(Design & Contingencies - $700,000)

 

5(xxi) State Correctional Institution at
6Somerset

 

7(A) Renovate 480-volt distribution
8switchgear and replace obsolete
9circuit breakers

 

10Project Allocation

432,000

11(Base Project Allocation - $346,000)

 

12(Design & Contingencies - $86,000)

 

13(B) Replace existing digital management
14system panels throughout institution

 

15Project Allocation

420,000

16(Base Project Allocation - $336,000)

 

17(Design & Contingencies - $84,000)

 

18(C) Replace roof on Correctional
19Industries Laundry Building

 

20Project Allocation

910,000

21(Base Project Allocation - $728,000)

 

22(Design & Contingencies - $182,000)

 

23(D) Replace proximity card access system
24throughout institution for door
25control

 

26Project Allocation

625,000

27(Base Project Allocation - $500,000)

 

28(Design & Contingencies - $125,000)

 

29(E) Replace rooftop heating and cooling
30units on inmate housing

 

1Project Allocation

775,000

2(Base Project Allocation - $620,000)

 

3(Design & Contingencies - $155,000)

 

4(xxii) State Correctional Institution at
5Waymart

 

6(A) Repoint exterior building masonry and
7repair parapets and brick work
8throughout institution

 

9Project Allocation

3,420,000

10(Base Project Allocation - $2,736,000)

 

11(Design & Contingencies - $684,000)

 

12(B) Demolish J-Ward and repair corridor
13and roof structure at current building
14tie-in point

 

15Project Allocation

840,000

16(Base Project Allocation - $672,000)

 

17(Design & Contingencies - $168,000)

 

18(C) Renovate and expand existing dining
19room to satisfy current needs

 

20Project Allocation

3,300,000

21(Base Project Allocation - $2,640,000)

 

22(Design & Contingencies - $660,000)

 

23(4) Department of Education

 

24(i) Department of Education Headquarters

 

25(A) Renovate two floors of Department of
26Education headquarters building at 333
27Market Street, Harrisburg

 

28Project Allocation

1,000,000

29(Base Project Allocation - $1,000,000)

 

30(ii) Lehigh Carbon Community College

 

1(A) Site development, infrastructure,
2redevelopment, construction and other
3costs related to construction of an
4educational facility in Carbon County

 

5Project Allocation

4,800,000

6(Base Project Allocation - $4,000,000)

 

7(Design & Contingencies - $800,000)

 

8(iii) Lincoln University

 

9(A) Additional funds for DGS Project No.
101101-46, construction of additional
11tennis courts, softball field, soccer
12field and bleachers to support track
13and soccer fields

 

14Project Allocation

20,000,000

15(Base Project Allocation -
16$16,000,000)

 

17(Design & Contingencies - $4,000,000)

 

18(B) Provide for new construction and
19renovation of three existing
20facilities to create the Center for
21the Study of Black Culture at the
22university

 

23Project Allocation

25,000,000

24(Base Project Allocation -
25$20,000,000)

 

26(Design & Contingencies - $5,000,000)

 

27(iv) Pennsylvania Highlands Community College

 

28(A) Acquisition, construction,
29rehabilitation and other costs related
30to the design and construction of

 

1facilities to be utilized as a branch
2campus to be located in Mifflin County

 

3Project Allocation

600,000

4(Base Project Allocation - $500,000)

 

5(Design & Contingencies - $100,000)

 

6(v) Community College of Philadelphia

 

7(A) Renovation of biology labs and
8associated prep rooms at main campus
9and West Regional Center

 

10Project Allocation

4,800,000

11(Base Project Allocation - $4,000,000)

 

12(Design & Contingencies - $800,000)

 

13(vi) Temple University

 

14(A) Renovate and modernize existing
15entrance to Tomlinson Hall

 

16Project Allocation

4,500,000

17(Base Project Allocation - $3,600,000)

 

18(Design & Contingencies - $900,000)

 

19(B) Renovate and construct an addition to
20Gladfelter Hall to house a Center for
21Scholars

 

22Project Allocation

2,700,000

23(Base Project Allocation - $2,400,000)

 

24(Design & Contingencies - $300,000)

 

25(C) Renovate Paley Library

 

26Project Allocation

90,000,000

27(Base Project Allocation -
28$90,000,000)

 

29(D) Renovate Old Dental School

 

30Project Allocation

75,000,000

1(Base Project Allocation -
2$75,000,000)

 

3(E) Renovate and expand law school

 

4Project Allocation

60,000,000

5(Base Project Allocation -
6$60,000,000)

 

7(F) Renovate and construct addition to
8College of Engineering

 

9Project Allocation

100,000,000

10(Base Project Allocation -
11$100,000,000)

 

12(G) Demolition of Baton Hall and
13construct campus quad, Main Campus

 

14Project Allocation

10,000,000

15(Base Project Allocation -
16$10,000,000)

 

17(H) Reface and renovate Health Sciences
18Campus

 

19Project Allocation

35,000,000

20(Base Project Allocation -
21$35,000,000)

 

22(I) Acquisition, infrastructure,
23renovations, construction and other
24related costs to support a dental,
25medical, health sciences and patient
26care facilities project in Lackawanna
27County

 

28Project Allocation

20,000,000

29(Base Project Allocation -
30$20,000,000)

 

1(vii) Thaddeus Stevens College of Technology

 

2(A) Upgrade and rehabilitate college's
3main electrical system, including
4infrastructure

 

5Project Allocation

3,000,000

6(Base Project Allocation - $2,400,000)

 

7(Design & Contingencies - $600,000)

 

8(B) Expand dining hall by adding second
9story which will connect into Hartzell
10Instructional Center

 

11Project Allocation

5,750,000

12(Base Project Allocation - $5,060,000)

 

13(Design & Contingencies - $690,000)

 

14(C) Infrastructure, development, design
15and other costs related to demolition
16of Leonard Building and construction
17of technology center

 

18Project Allocation

16,800,000

19(Base Project Allocation -
20$14,000,000)

 

21(Design & Contingencies - $2,800,000)

 

22(viii) The Pennsylvania State University

 

23(A) Convert existing coal-fired boilers
24to natural gas to comply with new
25EPA/DEP clean air regulations

 

26Project Allocation

25,000,000

27(Base Project Allocation -
28$20,000,000)

 

29(Design & Contingencies - $5,000,000)

 

30(B) Provide for continuation of capital

 

1to renovate campuses located in
2university's eastern region

 

3Project Allocation

28,000,000

4(Base Project Allocation -
5$28,000,000)

 

6(C) Design, infrastructure, construction,
7renovations, abatement of hazardous
8materials, utility upgrades and
9extensions and other related costs for
10state-of-the-art research and teaching
11space for College of Liberal Arts

 

12Project Allocation

54,000,000

13(Base Project Allocation -
14$43,200,000)

 

15(Design & Contingencies - $10,800,000)

 

16(D) Design, infrastructure, renovations,
17abatement of hazardous materials and
18other related costs for building
19access modifications, including
20installation of key access boxes and
21video surveillance cameras and
22infrastructure and any building
23modifications needed

 

24Project Allocation

10,000,000

25(Base Project Allocation - $8,000,000)

 

26(Design & Contingencies - $2,000,000)

 

27(E) Design, infrastructure, construction,
28renovations, abatement of hazardous
29materials, underground piping upgrades
30and additions and other related costs

 

1for a chilled water capacity and
2distribution expansion project at
3University Park campus

 

4Project Allocation

25,000,000

5(Base Project Allocation -
6$20,000,000)

 

7(Design & Contingencies - $5,000,000)

 

8(F) Design, infrastructure, construction,
9abatement of hazardous materials,
10utility upgrades and extensions and
11other related costs for new
12classroom/class lab building at
13University Park campus

 

14Project Allocation

51,300,000

15(Base Project Allocation -
16$41,040,000)

 

17(Design & Contingencies - $10,260,000)

 

18(G) Additional funding for renovations,
19rehabilitation, construction and other
20costs related to an addition to
21existing computer building or
22construction of new facility

 

23Project Allocation

10,000,000

24(Base Project Allocation -
25$10,000,000)

 

26(H) Design, acquisition, infrastructure,
27demolition, construction, abatement of
28hazardous materials, utility upgrades
29and extensions, and other related
30costs for a general computing Tier III

 

1data center

 

2Project Allocation

50,000,000

3(Base Project Allocation -
4$40,000,000)

 

5(Design & Contingencies - $10,000,000)

 

6(I) Additional funding for renovations to
7Henning Building, including upgrades
8to systems to bring them to current
9facility standards

 

10Project Allocation

15,000,000

11(Base Project Allocation -
12$15,000,000)

 

13(J) Infrastructure, renovations,
14construction, abatement of hazardous
15materials, utility upgrades and
16extensions and other related costs for
17the rehabilitation of Kostos Building

 

18Project Allocation

12,000,000

19(Base Project Allocation - $9,600,000)

 

20(Design & Contingencies - $2,400,000)

 

21(K) Design, infrastructure, construction,
22abatement of hazardous materials,
23utility upgrades and extensions and
24other related costs for a capital
25renewal project to Baker Engineering
26and Science Building

 

27Project Allocation

8,000,000

28(Base Project Allocation - $6,400,000)

 

29(Design & Contingencies - $1,600,000)

 

30(L) Design, infrastructure, construction,

 

1abatement of hazardous materials,
2utility upgrades and extensions and
3other related costs for new Recital
4Hall addition and Music I renovations

 

5Project Allocation

25,000,000

6(Base Project Allocation -
7$20,000,000)

 

8(Design & Contingencies - $5,000,000)

 

9(M) Design, infrastructure, construction,
10abatement of hazardous materials,
11utility upgrades and extensions and
12other related costs for a capital
13renewal project to Ruhl
14Student/Community Center and the
15attached multipurpose building

 

16Project Allocation

10,500,000

17(Base Project Allocation - $8,400,000)

 

18(Design & Contingencies - $2,100,000)

 

19(N) Design, infrastructure, construction,
20abatement of hazardous materials,
21utility extensions and other related
22costs for Student Union building at
23Brandywine

 

24Project Allocation

16,000,000

25(Base Project Allocation -
26$12,800,000)

 

27(Design & Contingencies - $3,200,000)

 

28(O) Design, infrastructure, construction,
29abatement of hazardous materials, and
30other related costs for capital

 

1renewal project to waste water
2treatment plant at University Park
3campus

 

4Project Allocation

45,000,000

5(Base Project Allocation -
6$36,000,000)

 

7(Design & Contingencies - $9,000,000)

 

8(P) Additional funding for
9infrastructure, construction and other
10related costs for construction of
11water treatment facility and
12distribution system at University Park

 

13Project Allocation

15,000,000

14(Base Project Allocation -
15$15,000,000)

 

16(Q) Design, infrastructure, construction,
17abatement of hazardous materials, and
18other related costs for athletic field
19conversion and expansion project at
20Pennsylvania College of Technology

 

21Project Allocation

1,200,000

22(Base Project Allocation - $1,000,000)

 

23(Design & Contingencies - $200,000)

 

24(R) Design, infrastructure, construction
25and other related costs for career and
26alumni center at Pennsylvania College
27of Technology

 

28Project Allocation

13,200,000

29(Base Project Allocation -
30$11,000,000)

 

1(Design & Contingencies - $2,200,000)

 

2(S) Design, infrastructure, construction
3and other related costs for athletic,
4fitness and wellness center at
5Pennsylvania College of Technology

 

6Project Allocation

30,000,000

7(Base Project Allocation -
8$25,000,000)

 

9(Design & Contingencies - $5,000,000)

 

10(ix) University of Pittsburgh

 

11(A) Renovate exterior of Hillman Library,
12including plaza, planters, windows,
13masonry and waterproofing membrane

 

14Project Allocation

10,000,000

15(Base Project Allocation - $8,000,000)

 

16(Design & Contingencies - $2,000,000)

 

17(B) Renovate Fitzgerald Fieldhouse to
18meet modern codes, including ADA, and
19expand building to meet demands

 

20Project Allocation

10,000,000

21(Base Project Allocation - $8,000,000)

 

22(Design & Contingencies - $2,000,000)

 

23(C) Renovate and construct addition to
24Trees Hall

 

25Project Allocation

40,000,000

26(Base Project Allocation -
27$40,000,000)

 

28(D) Renovate and construct addition to
29Fitzgerald Fieldhouse

 

30Project Allocation

20,000,000

1(Base Project Allocation -
2$20,000,000)

 

3(E) Renovate Bellefield Hall

 

4Project Allocation

15,000,000

5(Base Project Allocation -
6$15,000,000)

 

7(F) Renovate, construct addition and fit-
8out to Posvar Hall

 

9Project Allocation

30,000,000

10(Base Project Allocation -
11$30,000,000)

 

12(G) Renovation and addition to David
13Lawrence Hall

 

14Project Allocation

30,000,000

15(Base Project Allocation -
16$30,000,000)

 

17(H) Upgrade to Trees Field

 

18Project Allocation

20,000,000

19(Base Project Allocation -
20$20,000,000)

 

21(I) Upgrade and deferred maintenance --
22Phase VII

 

23Project Allocation

20,000,000

24(Base Project Allocation -
25$20,000,000)

 

26(J) Programmatic renovations - Phase III

 

27Project Allocation

20,000,000

28(Base Project Allocation -
29$20,000,000)

 

30(5) Department of Environmental Protection

 

1(i) Allegheny County

 

2(A) Acquisition, construction,
3infrastructure and other related costs
4for aviation, industrial and
5commercial site development and
6improvements, including flood
7mitigation and structural
8improvements, at or surrounding
9Allegheny County Airport

 

10Project Allocation

40,000,000

11(Base Project Allocation -
12$40,000,000)

 

13(B) Construction, infrastructure
14improvements and other costs related
15to the development of de-icing fluid
16treatment facility at Pittsburgh
17International Airport, including flood
18mitigation structural improvements

 

19Project Allocation

25,000,000

20(Base Project Allocation -
21$25,000,000)

 

22(C) Acquisition, construction,
23infrastructure and other related costs
24for the development of industrial and
25commercial sites at or surrounding
26Pittsburgh International Airport

 

27Project Allocation

50,000,000

28(Base Project Allocation -
29$50,000,000)

 

30(D) Acquisition, construction,

 

1infrastructure and other related costs
2for Pitcairn Borough Dirty Camp Run
3flood protection project

 

4Project Allocation

1,360,000

5(Base Project Allocation - $1,360,000)

 

6(ii) Cambria County

 

7(A) Additional funding for DGS Project
8183-19, flood protection project in
9Adams and Croyle Townships for south
10fork of Little Conemaugh River,
11including earthen levee repair and
12concrete channel rehabilitation

 

13Project Allocation

1,800,000

14(Base Project Allocation - $1,620,000)

 

15(Design & Contingencies - $180,000)

 

16(B) Rehabilitate existing flood
17protection in Northern Cambria
18Borough, including replacement of
19drainage structures, pedestrian ramp
20and mitigation

 

21Project Allocation

1,350,000

22(Base Project Allocation - $1,215,000)

 

23(Design & Contingencies - $135,000)

 

24(iii) Carbon County

 

25(A) Provide for complete rehabilitation
26of flood protection to bring existing
27flood protection to current standards
28in Weissport Borough

 

29Project Allocation

3,750,000

30(Base Project Allocation - $3,000,000)

 

1(Design & Contingencies - $750,000)

 

2(iv) Clearfield County

 

3(A) Rehabilitate existing flood
4protection in Irvona Borough,
5including replacement of drainage
6structures, elimination of two closure
7structures and mitigation

 

8Project Allocation

1,800,000

9(Base Project Allocation - $1,620,000)

 

10(Design & Contingencies - $180,000)

 

11(v) Columbia County

 

12(A) Provide additional funds for flood
13protection project in Town of
14Bloomsburg currently being designed by
15Baltimore District to satisfy post-
16Hurricane Katrina Federal guidelines

 

17Project Allocation

10,000,000

18(Base Project Allocation -
19$10,000,000)

 

20(vi) Dauphin County

 

21(A) Acquire and rehabilitate or construct
22south central regional office

 

23Project Allocation

22,750,000

24(Base Project Allocation -
25$20,475,000)

 

26(Design & Contingencies - $2,275,000)

 

27(vii) Lancaster County

 

28(A) Additional funding for DGS Project
29182-21, Marietta Borough flood
30protection project, including

 

1embankment, earthen levee, concrete
2wall closure and gates

 

3Project Allocation

20,700,000

4(Base Project Allocation -
5$18,630,000)

 

6(Design & Contingencies - $2,070,000)

 

7(viii) Lehigh County

 

8(A) Construction of a storm water
9retention system for flooding
10mitigation in Borough of Fountain Hill
11Mill 2 complex

 

12Project Allocation

1,000,000

13(Base Project Allocation - $1,000,000)

 

14(ix) Luzerne County

 

15(A) Repair or replace debris dam
16embankment and its inlet works on
17Brown Creek and replace damaged storm
18drains within Plymouth Borough

 

19Project Allocation

1,800,000

20(Base Project Allocation - $1,620,000)

 

21(Design & Contingencies - $180,000)

 

22(B) Additional funding for DGS Project
23183-3, stream bank stabilization in
24Pittston Township, including
25mitigation and maintenance on access
26ramps

 

27Project Allocation

1,350,000

28(Base Project Allocation - $1,215,000)

 

29(Design & Contingencies - $135,000)

 

30(x) Monroe County

 

1(A) Construction, infrastructure
2improvements and other costs related
3to Skytop Dam restoration

 

4Project Allocation

2,000,000

5(Base Project Allocation - $2,000,000)

 

6(xi) Montgomery County

 

7(A) Additional funding for DGS Project
8181-08, raising level of levees along
9Tacony Creek, construction of concrete
10channel, extension of culvert box and
11construction of new SEPTA railroad
12bridge for stream flow improvement in
13Cheltenham and Abington Townships

 

14Project Allocation

4,000,000

15(Base Project Allocation - $3,200,000)

 

16(Design & Contingencies - $800,000)

 

17(B) Additional funding for DGS Project
18181-17, Sandy Run flood protection
19project, in Abington and Upper Dublin
20Townships, including channel
21realignment and improvements,
22including mitigation

 

23Project Allocation

360,000

24(Base Project Allocation - $324,000)

 

25(Design & Contingencies - $36,000)

 

26(C) Additional funding for DGS Project
27181-8, raising level of levees along
28Tacony Creek, construction of concrete
29channel, extension of culvert box and
30construction of new SEPTA railroad

 

1bridge for stream flow improvement in
2Glenside area of Cheltenham Township,
3including raising of concrete channel
4wall and earthen levee and
5constructing concrete channel with
6culvert

 

7Project Allocation

1,800,000

8(Base Project Allocation - $1,620,000)

 

9(Design & Contingencies - $180,000)

 

10(D) Construction, infrastructure
11improvements and other costs related
12to Abington stream bank stabilization
13flood control project

 

14Project Allocation

200,000

15(Base Project Allocation - $200,000)

 

16(xii) Philadelphia County

 

17(A) Construction, infrastructure, storm
18water management and restoration of
19tidal wetland for Penn Treaty Park
20Phase I project

 

21Project Allocation

20,000,000

22(Base Project Allocation -
23$20,000,000)

 

24(B) Lake renovations and other costs
25related to Franklin Delano Roosevelt
26Park

 

27Project Allocation

20,000,000

28(Base Project Allocation -
29$20,000,000)

 

30(6) Department of General Services

 

1(i) Berks County

 

2(A) Upgrade and renovate two elevators in
3Reading State Office Building,
4including replacement of controller,
5car fixtures, corridor fixtures door
6operator, tracks/hangars and power
7unit

 

8Project Allocation

250,000

9(Base Project Allocation - $150,000)

 

10(Design & Contingencies - $100,000)

 

11(B) Completely renovate two elevators,
12including motors and remodeling, in
13Reading State Office Building

 

14Project Allocation

250,000

15(Base Project Allocation - $150,000)

 

16(Design & Contingencies - $100,000)

 

17(ii) Dauphin County

 

18(A) Replace wiring in all lighting
19fixtures in Main Capitol Building

 

20Project Allocation

1,500,000

21(Base Project Allocation - $1,500,000)

 

22(B) Upgrade and renovate all existing
23elevators, including upgrading motors
24and remodeling cabs, in Finance
25Building

 

26Project Allocation

910,000

27(Base Project Allocation - $700,000)

 

28(Design & Contingencies - $210,000)

 

29(C) Upgrade and renovate all existing
30elevators, including upgrading motors

 

1and remodeling cabs, in Forum Building

 

2Project Allocation

910,000

3(Base Project Allocation - $700,000)

 

4(Design & Contingencies - $210,000)

 

5(D) Replace roof, including paver
6supports, roof membrane and roof and
7parapet material of Keystone Building

 

8Project Allocation

2,500,000

9(Base Project Allocation - $2,000,000)

 

10(Design & Contingencies - $500,000)

 

11(E) Replace parapet roof, including full
12removal of old roof and repair
13spalling, in Finance Building

 

14Project Allocation

700,000

15(Base Project Allocation - $600,000)

 

16(Design & Contingencies - $100,000)

 

17(F) Repair roof-interstice space between
18roof and ceiling and tie into control
19system in Main Capitol Building

 

20Project Allocation

1,000,000

21(Base Project Allocation - $900,000)

 

22(Design & Contingencies - $100,000)

 

23(G) Replace roof and windows in Matthew
24J. Ryan Office Building

 

25Project Allocation

550,000

26(Base Project Allocation - $500,000)

 

27(Design & Contingencies - $50,000)

 

28(H) Remove and replace architectural
29grade shingles, remove and replace BUR
30roofs with R-30 insulation and EPDM

 

1roofing and replace EPDM roof on
2windows, including insulation, in DGS
3Annex Complex, Administration Building

 

4Project Allocation

113,000

5(Base Project Allocation - $110,000)

 

6(Design & Contingencies - $3,000)

 

7(I) Install central air conditioning in
8Chapel Building of DGS Annex Complex

 

9Project Allocation

116,000

10(Base Project Allocation - $113,000)

 

11(Design & Contingencies - $3,000)

 

12(J) Repair or replace damaged sandstone
13headers along entryway of Archives
14Building

 

15Project Allocation

310,000

16(Base Project Allocation - $300,000)

 

17(Design & Contingencies - $10,000)

 

18(K) Reline cooling towers, including
19membrane for chillers, at Central
20Plant

 

21Project Allocation

1,500,000

22(Base Project Allocation - $1,500,000)

 

23(L) Construct ADA entrance in North
24Office Building

 

25Project Allocation

750,000

26(Base Project Allocation - $700,000)

 

27(Design & Contingencies - $50,000)

 

28(M) Repave or rebuild various annex
29cartways at DGS Annex Complex

 

30Project Allocation

681,000

1(Base Project Allocation - $681,000)

 

2(N) Replace moduline diffuser in East
3Wing Building

 

4Project Allocation

381,000

5(Base Project Allocation - $381,000)

 

6(O) Completely renovate elevators,
7including motors and remodeling, in
8Finance Building

 

9Project Allocation

910,000

10(Base Project Allocation - $700,000)

 

11(Design & Contingencies - $210,000)

 

12(P) Completely renovate elevators,
13including motors and remodeling, in
14Forum Building

 

15Project Allocation

910,000

16(Base Project Allocation - $700,000)

 

17(Design & Contingencies - $210,000)

 

18(Q) Repair or replace pavers within
19Keystone Building Plaza

 

20Project Allocation

2,000,000

21(Base Project Allocation - $1,500,000)

 

22(Design & Contingencies - $500,000)

 

23(R) Completely replace roof of Arsenal
24Building, including flashing and roof
25drains

 

26Project Allocation

700,000

27(Base Project Allocation - $600,000)

 

28(Design & Contingencies - $100,000)

 

29(7) Pennsylvania Historical and Museum
30Commission

 

1(i) Brandywine Battlefield Park

 

2(A) Acquisition, infrastructure,
3renovation, construction and other
4related costs for redevelopment and
5preservation of Welcome Center and
6other historic buildings and access
7improvements

 

8Project Allocation

7,200,000

9(Base Project Allocation - $6,000,000)

 

10(Design & Contingencies - $1,200,000)

 

11(ii) Daniel Boone Homestead

 

12(A) Restore Daniel Boone Homestead and
13other structures at site

 

14Project Allocation

3,600,000

15(Base Project Allocation - $3,000,000)

 

16(Design & Contingencies - $600,000)

 

17(iii) Eckley Miners' Village

 

18(A) Install fire protection system,
19including construction of water main
20to provide sufficient fire suppression
21to buildings

 

22Project Allocation

3,600,000

23(Base Project Allocation - $3,000,000)

 

24(Design & Contingencies - $600,000)

 

25(B) Provide for Phase IV of preservation
26and restoration of miners' houses,
27including structural and interior
28restoration, infrastructure and
29restoration of outbuildings

 

30Project Allocation

4,800,000

1(Base Project Allocation - $4,000,000)

 

2(Design & Contingencies - $800,000)

 

3(iv) Erie Maritime Museum

 

4(A) Provide for replacement of portions
5of existing exhibits, selective
6exhibit component improvements, new
7energy-efficient exhibit lighting and
8installation of new exhibits

 

9Project Allocation

3,600,000

10(Base Project Allocation - $3,000,000)

 

11(Design & Contingencies - $600,000)

 

12(v) Landis Valley Village and Farm Museum

 

13(A) Replace underground sewage, water,
14electrical, phone, data and fire and
15security lines throughout site and
16upgrade HVAC system with new
17geothermal systems and other energy-
18saving equipment and features

 

19Project Allocation

9,000,000

20(Base Project Allocation - $7,500,000)

 

21(Design & Contingencies - $1,500,000)

 

22(B) Install fire protection system,
23including construction of water main
24to provide sufficient fire suppression
25to buildings

 

26Project Allocation

3,600,000

27(Base Project Allocation - $3,000,000)

 

28(Design & Contingencies - $600,000)

 

29(C) Provide site improvements, including
30preservation and restoration of

 

1interior and exterior of buildings

 

2Project Allocation

3,600,000

3(Base Project Allocation - $3,000,000)

 

4(Design & Contingencies - $600,000)

 

5(D) Design, fabricate and install new
6permanent exhibits for new visitor
7center

 

8Project Allocation

4,000,000

9(Base Project Allocation - $4,000,000)

 

10(vi) Old Economy Village

 

11(A) Rehabilitate exterior and structure
12of up to 18 buildings, including
13painting, roofing, moisture barriers,
14repair of structural members, masonry,
15gutters and drainage chimneys,
16electrical, wastewater systems, HVAC
17and water supply lines with
18archaeological investigations at site

 

19Project Allocation

3,000,000

20(Base Project Allocation - $2,500,000)

 

21(Design & Contingencies - $500,000)

 

22(vii) Pennsbury Manor

 

23(A) Install fire protection system,
24including construction of water main
25to provide sufficient fire suppression
26to buildings

 

27Project Allocation

2,400,000

28(Base Project Allocation - $2,000,000)

 

29(Design & Contingencies - $400,000)

 

30(viii) Pennsylvania Anthracite Heritage

 

1Museum

 

2(A) Install fire protection system,
3including bringing sufficient water to
4building and installation of new
5sprinklers and gas/chemical
6suppression system in collection area

 

7Project Allocation

960,000

8(Base Project Allocation - $800,000)

 

9(Design & Contingencies - $160,000)

 

10(ix) Pennsylvania Lumber Museum

 

11(A) Provide for second phase of exhibits
12in main gallery, as well as outdoor
13site interpretive signage and exhibits

 

14Project Allocation

3,600,000

15(Base Project Allocation - $3,000,000)

 

16(Design & Contingencies - $600,000)

 

17(x) Railroad Museum of Pennsylvania

 

18(A) Install fire protection system,
19including construction of water main
20to provide sufficient fire suppression
21to buildings

 

22Project Allocation

1,200,000

23(Base Project Allocation - $1,000,000)

 

24(Design & Contingencies - $200,000)

 

25(xi) Washington Crossing Historic Park

 

26(A) Provide restoration and improvements
27to Bowman's Hill Tower and ancillary
28facilities

 

29Project Allocation

6,000,000

30(Base Project Allocation - $5,000,000)

 

1(Design & Contingencies - $1,000,000)

 

2(B) Install fire protection system,
3including construction of water main
4to provide sufficient fire suppression
5to buildings

 

6Project Allocation

2,400,000

7(Base Project Allocation - $2,000,000)

 

8(Design & Contingencies - $400,000)

 

9(8) Department of Labor and Industry

 

10(i) Labor and Industry Building, Harrisburg,
11Dauphin County

 

12(A) Replace two high voltage
13transformers, including infrastructure

 

14Project Allocation

5,000,000

15(Base Project Allocation - $4,500,000)

 

16(Design & Contingencies - $500,000)

 

17(9) Department of Military and Veterans Affairs

 

18(i) Combined Support Maintenance Shop,
19Allegheny County

 

20(A) Consolidate three field maintenance
21shops into one field maintenance
22facility, including unheated storage
23space and parking

 

24Project Allocation

1,440,000

25(Base Project Allocation - $1,200,000)

 

26(Design & Contingencies - $240,000)

 

27(ii) Coraopolis Readiness Center, Allegheny
28County

 

29(A) Rehabilitate Coraopolis Readiness
30Center, including assembly hall,

 

1classrooms, administrative offices,
2storage space, restrooms, locker rooms
3and mechanical rooms; upgrade building
4systems (HVAC, roofs, windows, doors);
5and repair façade and parking facility

 

6Project Allocation

1,500,000

7(Base Project Allocation - $1,250,000)

 

8(Design & Contingencies - $250,000)

 

9(B) Rehabilitate Coraopolis Readiness
10Center, including assembly hall,
11classrooms, administrative offices,
12storage space, restrooms, locker rooms
13and mechanical rooms; upgrade building
14systems (HVAC, roofs, windows, doors);
15and repair façade

 

16Project Allocation

1,500,000

17(Base Project Allocation - $1,250,000)

 

18(Design & Contingencies - $250,000)

 

19(iii) Pittsburgh Hunt Readiness Center,
20Allegheny County

 

21(A) Rehabilitate Pittsburgh Hunt
22Readiness Center, including assembly
23hall, classrooms, administrative
24offices, storage space, restrooms,
25locker rooms and mechanical rooms;
26upgrade building systems (HVAC, roofs,
27windows, doors); repair façade; expand
28parking; and construct unheated
29storage facility

 

30Project Allocation

4,500,000

1(Base Project Allocation - $4,000,000)

 

2(Design & Contingencies - $500,000)

 

3(iv) Pittsburgh Support Maintenance Shop,
4Allegheny County

 

5(A) Combine three field maintenance shops
6with 11,300 square feet of usable
7space and 2,250 square feet of
8unheated storage

 

9Project Allocation

1,440,000

10(Base Project Allocation - $1,200,000)

 

11(Design & Contingencies - $240,000)

 

12(v) Southwestern Veterans Center, Allegheny
13County

 

14(A) Renovate and repair Southwestern
15Veterans Center, including replacement
16of facility roof

 

17Project Allocation

3,125,000

18(Base Project Allocation - $2,500,000)

 

19(Design & Contingencies - $625,000)

 

20(B) Provide for renovation and general
21repairs of Southwestern Veterans
22Center, including life safety and
23regulatory deficiencies

 

24Project Allocation

7,125,000

25(Base Project Allocation - $5,700,000)

 

26(Design & Contingencies - $1,425,000)

 

27(vi) Ford City Readiness Center, Armstrong
28County

 

29(A) Rehabilitate Ford City Readiness
30Center, including assembly hall,

 

1classrooms, administrative offices,
2storage space, restrooms, locker rooms
3and mechanical rooms; upgrade building
4systems (HVAC, roofs, windows, doors);
5repair façade; expand parking; and
6construct unheated storage facility

 

7Project Allocation

3,000,000

8(Base Project Allocation - $2,500,000)

 

9(Design & Contingencies - $500,000)

 

10(vii) Hollidaysburg Readiness Center, Blair
11County

 

12(A) Rehabilitate Hollidaysburg Readiness
13Center, including assembly hall,
14classrooms, administrative offices,
15storage space, restrooms, locker rooms
16and mechanical rooms; upgrade building
17systems (HVAC, roofs, windows, doors);
18and repair façade and parking facility

 

19Project Allocation

2,800,000

20(Base Project Allocation - $2,400,000)

 

21(Design & Contingencies - $400,000)

 

22(B) Rehabilitate Hollidaysburg Readiness
23Center, including assembly hall,
24classrooms, administrative offices,
25storage space, restrooms, locker rooms
26and mechanical rooms; upgrade building
27systems (HVAC, roofs, windows, doors);
28and repair façade

 

29Project Allocation

2,400,000

30(Base Project Allocation - $2,000,000)

 

1(Design & Contingencies - $400,000)

 

2(viii) Hollidaysburg Veterans Home, Blair
3County

 

4(A) Provide for renovation and general
5repairs of Hollidaysburg Veterans
6Home, including upgrading community
7living center at Eisenhower Hall and
8constructing meal delivery systems at
9Arnold and Eisenhower Halls

 

10Project Allocation

1,325,000

11(Base Project Allocation - $1,060,000)

 

12(Design & Contingencies - $265,000)

 

13(B) Provide for renovation and general
14repairs of Hollidaysburg Veterans Home

 

15Project Allocation

5,325,000

16(Base Project Allocation - $4,260,000)

 

17(Design & Contingencies - $1,065,000)

 

18(ix) Butler Readiness Center, Butler County

 

19(A) Rehabilitate Butler Readiness Center,
20including assembly hall, classrooms,
21administrative offices, storage space,
22restrooms, locker rooms and mechanical
23rooms; upgrade building systems (HVAC,
24roofs, windows, doors); repair façade;
25expand parking; and construct unheated
26storage facility

 

27Project Allocation

3,800,000

28(Base Project Allocation - $3,300,000)

 

29(Design & Contingencies - $500,000)

 

30(x) Southeastern Veterans Center, Chester

 

1County

 

2(A) Provide for renovation and general
3repairs of Southeastern Veterans
4Center, including upgrades and
5renovations at Coates Hall and
6construction of new maintenance
7building

 

8Project Allocation

1,925,000

9(Base Project Allocation - $1,540,000)

 

10(Design & Contingencies - $385,000)

 

11(B) Provide for renovation and general
12repairs of Southeastern Veterans
13Center, including replacement of
14facility roof

 

15Project Allocation

5,925,000

16(Base Project Allocation - $4,740,000)

 

17(Design & Contingencies - $1,185,000)

 

18(xi) Spring City Armory, Chester County

 

19(A) Rehabilitate Spring City Armory to
20current standards, including assembly
21hall, classrooms, administrative
22offices, storage space, restrooms,
23locker rooms and mechanical rooms;
24upgrade building systems (HVAC, roofs,
25windows, doors); repair façade; expand
26parking; and construct unheated
27storage facility

 

28Project Allocation

3,600,000

29(Base Project Allocation - $3,000,000)

 

30(Design & Contingencies - $600,000)

 

1(xii) Spring City Readiness Center, Chester
2County

 

3(A) Rehabilitate Spring City Readiness
4Center, including assembly hall,
5classrooms, administrative offices,
6storage space, restrooms, locker rooms
7and mechanical rooms; upgrade building
8systems (HVAC, roofs, windows, doors);
9repair façade; expand parking; and
10construct unheated storage facility

 

11Project Allocation

3,600,000

12(Base Project Allocation - $3,000,000)

 

13(Design & Contingencies - $600,000)

 

14(xiii) Lock Haven Readiness Center, Clinton
15County

 

16(A) Rehabilitate Lock Haven Readiness
17Center, including assembly hall,
18classrooms, administrative offices,
19storage space, restrooms, locker rooms
20and mechanical rooms; upgrade building
21systems (HVAC, roofs, windows, doors);
22repair façade; expand parking; and
23construct unheated storage facility

 

24Project Allocation

3,000,000

25(Base Project Allocation - $2,500,000)

 

26(Design & Contingencies - $500,000)

 

27(B) Renovate Lock Haven Readiness Center
28to current standards, including
29assembly hall, classrooms,
30administrative offices, storage space,

 

1restrooms, locker rooms and mechanical
2rooms; upgrade building systems (HVAC,
3roofs, windows, doors); repair façade;
4expand parking; and construct unheated
5storage facility

 

6Project Allocation

3,000,000

7(Base Project Allocation - $2,500,000)

 

8(Design & Contingencies - $500,000)

 

9(xiv) Harrisburg Readiness Center, Dauphin
10County

 

11(A) Rehabilitate Harrisburg Readiness
12Center, including assembly hall,
13classrooms, administrative offices,
14storage space, restrooms, locker rooms
15and mechanical rooms; upgrade building
16systems (HVAC, roofs, windows, doors);
17repair façade; expand parking; and
18construct unheated storage facility

 

19Project Allocation

4,600,000

20(Base Project Allocation - $4,000,000)

 

21(Design & Contingencies - $600,000)

 

22(xv) Pennsylvania Soldiers and Sailors Home,
23Erie County

 

24(A) Provide for renovation and general
25repairs of Pennsylvania Soldiers and
26Sailors Home, including life safety
27and regulatory deficiencies

 

28Project Allocation

3,200,000

29(Base Project Allocation - $2,560,000)

 

30(Design & Contingencies - $640,000)

 

1(B) Provide for renovation and general
2repairs of Pennsylvania Soldiers and
3Sailors Home, including life safety
4and regulatory deficiencies

 

5Project Allocation

7,200,000

6(Base Project Allocation - $5,760,000)

 

7(Design & Contingencies - $1,440,000)

 

8(xvi) Indiana Readiness Center, Indiana
9County

 

10(A) Rehabilitate Indiana Readiness
11Center, including assembly hall,
12classrooms, administrative offices,
13storage space, restrooms, locker rooms
14and mechanical rooms; upgrade building
15systems (HVAC, roofs, windows, doors);
16repair façade; expand parking; and
17construct unheated storage facility

 

18Project Allocation

3,200,000

19(Base Project Allocation - $2,700,000)

 

20(Design & Contingencies - $500,000)

 

21(xvii) Gino J. Merli Veterans Center,
22Lackawanna County

 

23(A) Provide for renovation and general
24repairs of Gino J. Merli Veterans
25Center, including life safety and
26regulatory deficiencies

 

27Project Allocation

2,895,000

28(Base Project Allocation - $2,316,000)

 

29(Design & Contingencies - $579,000)

 

30(B) Provide for renovation and general

 

1repairs of Gino J. Merli Veterans
2Center, including life safety and
3regulatory deficiencies

 

4Project Allocation

6,895,000

5(Base Project Allocation - $5,516,000)

 

6(Design & Contingencies - $1,379,000)

 

7(xviii) Wilkes-Barre Readiness Center,
8Luzerne County

 

9(A) Rehabilitate Wilkes-Barre Readiness
10Center, including assembly hall,
11dining facility, classrooms,
12administrative offices, storage space,
13restrooms, locker rooms, parking for
14privately owned and military vehicles
15and renovation of existing facility

 

16Project Allocation

3,000,000

17(Base Project Allocation- $2,500,000)

 

18(Design & Contingencies - $500,000)

 

19(B) Rehabilitate Wilkes-Barre Readiness
20Center, including assembly hall,
21dining facility, classrooms,
22administration offices, storage space,
23restrooms, locker rooms and mechanical

 

24Project Allocation

3,000,000

25(Base Project Allocation- $2,500,000)

 

26(Design & Contingencies - $500,000)

 

27(xix) Bradford Readiness Center, McKean
28County

 

29(A) Expand Bradford Readiness Center,
30including additional classroom,

 

1administrative offices, storage space,
2restrooms, locker rooms, mechanical
3rooms and parking facilities

 

4Project Allocation

1,200,000

5(Base Project Allocation - $1,000,000)

 

6(Design & Contingencies - $200,000)

 

7(B) Expand Bradford Readiness Center,
8including infrastructure at airport

 

9Project Allocation

1,200,000

10(Base Project Allocation - $1,000,000)

 

11(Design & Contingencies - $200,000)

 

12(xx) Kane Readiness Center, McKean County

 

13(A) Rehabilitate Kane Readiness Center,
14including assembly hall, classrooms,
15administrative offices, storage space,
16restrooms, locker rooms and mechanical
17rooms; upgrade building systems (HVAC,
18roofs, windows, doors); repair façade;
19expand parking; and construct unheated
20storage facility

 

21Project Allocation

3,300,000

22(Base Project Allocation - $2,800,000)

 

23(Design & Contingencies - $500,000)

 

24(xxi) Hermitage Readiness Center, Mercer
25County

 

26(A) Rehabilitate Hermitage Readiness
27Center, including assembly hall,
28classrooms, administrative offices,
29storage space, restrooms, locker rooms
30and mechanical rooms; upgrade building

 

1systems (HVAC, roofs, windows, doors);
2repair façade; expand parking; and
3construct unheated storage facility

 

4Project Allocation

4,700,000

5(Base Project Allocation - $4,000,000)

 

6(Design & Contingencies - $700,000)

 

7(xxii) East Stroudsburg Readiness Center,
8Monroe County

 

9(A) Rehabilitate East Stroudsburg
10Readiness Center, including assembly
11hall, classrooms, administrative
12offices, storage space, restrooms,
13locker rooms and mechanical rooms;
14upgrade building systems (HVAC, roofs,
15windows, doors); repair façade; expand
16parking; and construct unheated
17storage facility

 

18Project Allocation

3,000,000

19(Base Project Allocation - $2,400,000)

 

20(Design & Contingencies - $600,000)

 

21(xxiii) Tobyhanna Armed Forces Reserve
22Center, Monroe County

 

23(A) Rehabilitation and building expansion
24of Tobyhanna Armed Forces Center,
25including assembly hall, kitchen,
26supply, locker room, administration
27and classroom with parking, including
28maintenance facility

 

29Project Allocation

600,000

30(Base Project Allocation - $500,000)

 

1(Design & Contingencies - $100,000)

 

2(B) Construct armed forces reserve
3center, including assembly hall,
4kitchen, supply, locker room,
5administrative and classroom spaces
6and parking

 

7Project Allocation

600,000

8(Base Project Allocation - $500,000)

 

9(Design & Contingencies - $100,000)

 

10(xxiv) Plymouth Meeting Readiness Center,
11Montgomery County

 

12(A) Rehabilitate Plymouth Meeting
13Readiness Center, including assembly
14hall, classrooms, administrative
15offices, storage space, restrooms,
16locker rooms and mechanical rooms;
17upgrade building systems (HVAC, roofs,
18windows, doors); repair façade; expand
19parking; and construct unheated
20storage facility

 

21Project Allocation

4,500,000

22(Base Project Allocation - $3,900,000)

 

23(Design & Contingencies - $600,000)

 

24(xxv) Delaware Valley Veterans Home,
25Philadelphia County

 

26(A) Provide for renovation and general
27repairs of Delaware Valley Veterans
28Home, including life safety and
29regulatory deficiencies

 

30Project Allocation

1,625,000

1(Base Project Allocation - $1,300,000)

 

2(Design & Contingencies - $325,000)

 

3(B) Provide for renovation and general
4repairs of Delaware Valley Veterans
5Home, including life safety and
6regulatory deficiencies

 

7Project Allocation

5,625,000

8(Base Project Allocation - $4,500,000)

 

9(Design & Contingencies - $1,125,000)

 

10(xxvi) Schuylkill County Readiness Center,
11Schuylkill County

 

12(A) Purchase 10 to 20 acres of land for
13future construction of new Schuylkill
14County Readiness Center to replace
15current facilities to meet new
16requirements

 

17Project Allocation

1,600,000

18(Land Allocation - $1,600,000)

 

19(B) Acquire 10 to 20 acres of land for
20future development and use

 

21Project Allocation

1,600,000

22(Land Allocation - $1,600,000)

 

23(xxvii) Mount Pleasant Readiness Center,
24Westmoreland County

 

25(A) Rehabilitate Mount Pleasant Readiness
26Center, including assembly hall,
27classrooms, administrative offices,
28storage space, restrooms, locker rooms
29and mechanical rooms; upgrade building
30systems (HVAC, roofs, windows, doors);

 

1repair façade; expand parking; and
2construct unheated storage facility

 

3Project Allocation

3,000,000

4(Base Project Allocation - $2,500,000)

 

5(Design & Contingencies - $500,000)

 

6(xxviii) York Readiness Center, York County

 

7(A) Rehabilitate York Readiness Center,
8including assembly hall, classrooms,
9administrative offices, storage space,
10restrooms, locker rooms and mechanical
11rooms; upgrade building systems (HVAC,
12roofs, windows, doors); repair façade;
13expand parking; and construct unheated
14storage space

 

15Project Allocation

2,400,000

16(Base Project Allocation - $2,000,000)

 

17(Design & Contingencies - $400,000)

 

18(10) Department of Public Welfare

 

19(i) Clarks Summit State Hospital

 

20(A) Replace all G & W oil switches and
21high voltage lines throughout facility
22and install new generators at
23Buildings 2 and 7, including new 200-
24amp service

 

25Project Allocation

5,000,000

26(Base Project Allocation - $4,300,000)

 

27(Design & Contingencies - $700,000)

 

28(B) Upgrade fire alarm and fire
29suppression system throughout facility

 

30Project Allocation

2,800,000

1(Base Project Allocation - $2,520,000)

 

2(Design & Contingencies - $280,000)

 

3(ii) Cresson Secure Treatment Unit

 

4(A) Construct multipurpose modular
5building for classroom and gym use

 

6Project Allocation

3,000,000

7(Base Project Allocation - $2,500,000)

 

8(Design & Contingencies - $500,000)

 

9(iii) Danville State Hospital

 

10(A) Replace tower roof and flat roof of
11Building I

 

12Project Allocation

750,000

13(Base Project Allocation - $650,000)

 

14(Design & Contingencies - $100,000)

 

15(iv) Ebensburg Center

 

16(A) Replace, install and upgrade air
17conditioning to various hallways,
18corridors, day activity rooms, and
19dining areas in five residential units

 

20Project Allocation

500,000

21(Base Project Allocation - $388,000)

 

22(Design & Contingencies - $112,000)

 

23(B) Upgrade fire alarm and fire
24suppression system throughout facility

 

25Project Allocation

2,200,000

26(Base Project Allocation - $1,980,000)

 

27(Design & Contingencies - $220,000)

 

28(v) Loysville Youth Development Center

 

29(A) Replace fire lines and pumps and
30install new fire sprinklers in

 

1Building 10

 

2Project Allocation

1,800,000

3(Base Project Allocation - $1,500,000)

 

4(Design & Contingencies - $300,000)

 

5(B) Upgrade and replace HVAC equipment
6throughout facility to meet current
7ventilation codes

 

8Project Allocation

3,000,000

9(Base Project Allocation - $2,700,000)

 

10(Design & Contingencies - $300,000)

 

11(vi) New Castle Youth Development Center

 

12(A) Install air conditioning for Free
13Mills School

 

14Project Allocation

3,300,000

15(Base Project Allocation - $2,750,000)

 

16(Design & Contingencies - $550,000)

 

17(B) Replace existing standard glass
18windows with new security-type
19shatterproof glass windows for health
20and safety issues

 

21Project Allocation

600,000

22(Base Project Allocation - $540,000)

 

23(Design & Contingencies - $60,000)

 

24(vii) Norristown State Hospital

 

25(A) Demolish vacant and deteriorated
26buildings considered a nuisance and
27hazard

 

28Project Allocation

1,000,000

29(Base Project Allocation - $900,000)

 

30(Design & Contingencies - $100,000)

 

1(B) Upgrade and replace HVAC equipment
2throughout facility to meet current
3ventilation codes

 

4Project Allocation

5,000,000

5(Base Project Allocation - $4,500,000)

 

6(Design & Contingencies - $500,000)

 

7(viii) North Central Secure Treatment Unit

 

8(A) Construct multipurpose modular
9building for classroom and gym use

 

10Project Allocation

5,400,000

11(Base Project Allocation - $4,500,000)

 

12(Design & Contingencies - $900,000)

 

13(B) Replace existing standard glass
14windows with new security-type
15shatterproof glass windows for health
16and safety issues

 

17Project Allocation

600,000

18(Base Project Allocation - $540,000)

 

19(Design & Contingencies - $60,000)

 

20(ix) Polk Center

 

21(A) Remove and replace water plant

 

22Project Allocation

2,500,000

23(Base Project Allocation - $2,500,000)

 

24(B) Repair all mortar joints between
25brick and seal all brick and mortar
26joints

 

27Project Allocation

2,500,000

28(Base Project Allocation - $2,250,000)

 

29(Design & Contingencies - $250,000)

 

30(C) Upgrade fire alarm and fire

 

1suppression system throughout facility

 

2Project Allocation

1,800,000

3(Base Project Allocation - $1,620,000)

 

4(Design & Contingencies - $180,000)

 

5(x) Selinsgrove Center

 

6(A) Reseal joints and renovate lighting
7and drainage systems in steam tunnels
8between power plant and central
9building complex

 

10Project Allocation

550,000

11(Base Project Allocation - $475,000)

 

12(Design & Contingencies - $75,000)

 

13(B) Upgrade fire alarm and fire
14suppression system throughout facility

 

15Project Allocation

2,700,000

16(Base Project Allocation - $2,430,000)

 

17(Design & Contingencies - $270,000)

 

18(xi) South Mountain Restoration Center

 

19(A) Provide for breech of Carbarough Dam
20and land restoration to protect
21property and life as mandated by
22Department of Environmental Protection

 

23Project Allocation

3,500,000

24(Base Project Allocation - $3,150,000)

 

25(Design & Contingencies - $350,000)

 

26(xii) Torrance State Hospital

 

27(A) Replace existing wastewater treatment
28plant to comply with current
29regulations and codes

 

30Project Allocation

4,500,000

1(Base Project Allocation - $4,200,000)

 

2(Design & Contingencies - $300,000)

 

3(B) Additional funds for construction and
4replacement of existing wastewater
5treatment plant

 

6Project Allocation

2,000,000

7(Base Project Allocation - $2,000,000)

 

8(xiii) Warren State Hospital

 

9(A) Upgrade medium-voltage and low-
10voltage electrical gear throughout
11facility

 

12Project Allocation

4,000,000

13(Base Project Allocation - $3,600,000)

 

14(Design & Contingencies - $400,000)

 

15(xiv) White Haven Center

 

16(A) Upgrade fire alarm and fire
17suppression system throughout facility

 

18Project Allocation

2,100,000

19(Base Project Allocation - $1,890,000)

 

20(Design & Contingencies - $210,000)

 

21(B) Upgrade existing facility to comply
22with current emission requirements

 

23Project Allocation

5,500,000

24(Base Project Allocation - $4,950,000)

 

25(Design & Contingencies - $550,000)

 

26(11) Pennsylvania State Police

 

27(i) DNA Laboratory, Westmoreland County

 

28(A) Construct new DNA laboratory in
29Greensburg to meet requirements and
30codes

 

1Project Allocation

29,000,000

2(Base Project Allocation - 22,500,000)

 

3(Land Allocation - $1,500,000)

 

4(Design & Contingencies - $5,000,000)

 

5(12) State System of Higher Education

 

6(i) Bloomsburg University

 

7(A) Construct facilities complex to
8centralize facilities management
9functions into single complex of
10buildings

 

11Project Allocation

19,000,000

12(Base Project Allocation -
13$15,200,000)

 

14(Design & Contingencies - $3,800,000)

 

15(ii) Cheyney University

 

16(A) Completely renovate Coppin Hall
17Building

 

18Project Allocation

9,000,000

19(Base Project Allocation - $7,200,000)

 

20(Design & Contingencies - $1,800,000)

 

21(B) Construction, infrastructure and
22other related costs for the design and
23construction of dormitory

 

24Project Allocation

12,000,000

25(Base Project Allocation -
26$10,000,000)

 

27(Design & Contingencies - $2,000,000)

 

28(iii) East Stroudsburg University

 

29(A) Completely renovate Kemp Library
30Building

 

1Project Allocation

45,000,000

2(Base Project Allocation -
3$36,000,000)

 

4(Design & Contingencies - $9,000,000)

 

5(iv) Indiana University of Pennsylvania

 

6(A) Additional funding for renovation of
7Stapleton/Stabley Library, including
8space reconfiguration

 

9Project Allocation

14,500,000

10(Base Project Allocation -
11$11,600,000)

 

12(Design & Contingencies - $2,900,000)

 

13(v) Kutztown University

 

14(A) Additional funding for renovation of
15Beecky Education Building, including
16infrastructure

 

17Project Allocation

9,000,000

18(Base Project Allocation - $7,200,000)

 

19(Design & Contingencies - $1,800,000)

 

20(vi) Lock Haven University

 

21(A) Renovate and upgrade campus
22electrical infrastructure to meet
23modern demands and efficiencies

 

24Project Allocation

16,000,000

25(Base Project Allocation -
26$12,800,000)

 

27(Design & Contingencies - $3,200,000)

 

28(B) Additional funding for renovation of
29South Ulmer Hall, including
30infrastructure converting from science

 

1to general classroom

 

2Project Allocation

23,000,000

3(Base Project Allocation -
4$18,400,000)

 

5(Design & Contingencies - $4,600,000)

 

6(C) Renovate Russell Hall, including
7infrastructure

 

8Project Allocation

15,000,000

9(Base Project Allocation -
10$12,000,000)

 

11(Design & Contingencies - $3,000,000)

 

12(vii) Mansfield University

 

13(A) Renovate Belknap and Retan Halls to
14provide better functionality and space
15usage

 

16Project Allocation

10,000,000

17(Base Project Allocation - $8,000,000)

 

18(Design & Contingencies - $2,000,000)

 

19(viii) Millersville University

 

20(A) Completely renovate Pucillo Hall,
21including infrastructure

 

22Project Allocation

7,000,000

23(Base Project Allocation - $5,600,000)

 

24(Design & Contingencies - $1,400,000)

 

25(B) Completely renovate Brooks Hall into
26health and wellness center

 

27Project Allocation

15,000,000

28(Base Project Allocation -
29$12,000,000)

 

30(Design & Contingencies - $3,000,000)

 

1(ix) Shippensburg University

 

2(A) Additional funding for renovation of
3Franklin Science Center

 

4Project Allocation

25,000,000

5(Base Project Allocation -
6$20,000,000)

 

7(Design & Contingencies - $5,000,000)

 

8(B) Additional funding for replacement of
9Henderson Hall

 

10Project Allocation

11,000,000

11(Base Project Allocation - $8,800,000)

 

12(Design & Contingencies - $2,200,000)

 

13(x) West Chester University

 

14(A) Additional funding for renovation of
15Sturzebecker Health Science Center,
16including new addition

 

17Project Allocation

13,000,000

18(Base Project Allocation -
19$10,400,000)

 

20(Design & Contingencies - $2,600,000)

 

21(13) Department of Transportation

 

22(i) Adams County

 

23(A) Construct new vehicle wash building
24at Adams County Maintenance Garage

 

25Project Allocation

690,000

26(Base Project Allocation - $600,000)

 

27(Design & Contingencies - $90,000)

 

28(B) Develop new stockpile facility in
29Adams County, including site purchase,
30design and construction

 

1Project Allocation

2,220,000

2(Base Project Allocation - $2,000,000)

 

3(Land Allocation - $20,000)

 

4(Design & Contingencies - $200,000)

 

5(ii) Allegheny County

 

6(A) Renovate Allegheny County District
711-0 Office, including roof,
8infrastructure, energy efficiencies
9and program requirements

 

10Project Allocation

2,200,000

11(Base Project Allocation - $2,000,000)

 

12(Design & Contingencies - $200,000)

 

13(B) Renovate Allegheny County Maintenance
14Garage, including roof,
15infrastructure, energy efficiencies
16and program requirements

 

17Project Allocation

825,000

18(Base Project Allocation - $750,000)

 

19(Design & Contingencies - $75,000)

 

20(C) Construct new PM/service/line paint
21building at the Neville Island
22Stockpile Facility

 

23Project Allocation

775,000

24(Base Project Allocation - $700,000)

 

25(Design & Contingencies - $75,000)

 

26(D) Construct new service/PM building at
27Fort Pitt Tunnel Facility to meet
28program requirements

 

29Project Allocation

3,850,000

30(Base Project Allocation - $3,500,000)

 

1(Design & Contingencies - $350,000)

 

2(E) Replace electric generators and
3remove existing roof systems at Fort
4Pitt, Liberty and Squirrel Hill Tunnel
5Facilities

 

6Project Allocation

3,350,000

7(Base Project Allocation - $3,000,000)

 

8(Design & Contingencies - $350,000)

 

9(iii) Beaver County

 

10(A) Construct new PM/service/line paint
11building at Beaver County Maintenance
12Facility

 

13Project Allocation

775,000

14(Base Project Allocation - $700,000)

 

15(Design & Contingencies - $75,000)

 

16(B) Remove and replace roof system at
17Beaver County Maintenance Facility

 

18Project Allocation

525,000

19(Base Project Allocation - $450,000)

 

20(Design & Contingencies - $75,000)

 

21(C) Construct new PM building at Beaver
22County Maintenance Facility

 

23Project Allocation

1,100,000

24(Base Project Allocation - $1,000,000)

 

25(Design & Contingencies - $100,000)

 

26(iv) Berks County

 

27(A) Construct new vehicle wash building
28at Berks County Maintenance Garage

 

29Project Allocation

690,000

30(Base Project Allocation - $600,000)

 

1(Design & Contingencies - $90,000)

 

2(v) Dauphin County

 

3(A) Construct new vehicle wash building
4at Dauphin County Maintenance Garage

 

5Project Allocation

690,000

6(Base Project Allocation - $600,000)

 

7(Design & Contingencies - $90,000)

 

8(B) Develop new stockpile facility in
9Dauphin County, including site
10purchase, design and construction

 

11Project Allocation

2,220,000

12(Base Project Allocation - $2,000,000)

 

13(Land Allocation - $20,000)

 

14(Design & Contingencies - $200,000)

 

15(C) Construct new vehicle wash building
16at Dauphin County Maintenance Garage
17Stockpile 02 in Elizabethville

 

18Project Allocation

690,000

19(Base Project Allocation - $600,000)

 

20(Design & Contingencies - $90,000)

 

21(vi) Delaware County

 

22(A) Develop new stockpile facility in
23Delaware County, including site
24purchase, design and construction

 

25Project Allocation

2,220,000

26(Base Project Allocation - $2,000,000)

 

27(Land Allocation - $20,000)

 

28(Design & Contingencies - $200,000)

 

29(vii) Franklin County

 

30(A) Develop new stockpile facility in

 

1Franklin County, including site
2purchase, design and construction

 

3Project Allocation

2,220,000

4(Base Project Allocation - $2,000,000)

 

5(Land Allocation - $20,000)

 

6(Design & Contingencies - $200,000)

 

7(B) Develop new stockpile facility to
8replace SP 17 in Franklin County,
9including site purchase, design and
10construction

 

11Project Allocation

2,220,000

12(Base Project Allocation - $2,000,000)

 

13(Land Allocation - $20,000)

 

14(Design & Contingencies - $200,000)

 

15(viii) Lackawanna County

 

16(A) Renovate and expand District 4-0
17District Office to bring building into
18code compliance, upgrade buildings
19systems and improve program
20requirements and energy efficiency

 

21Project Allocation

2,750,000

22(Base Project Allocation - $2,500,000)

 

23(Design & Contingencies - $250,000)

 

24(ix) Lancaster County

 

25(A) Develop new stockpile facility in
26Lancaster County, including site
27purchase, design and construction

 

28Project Allocation

2,220,000

29(Base Project Allocation - $2,000,000)

 

30(Land Allocation - $20,000)

 

1(Design & Contingencies - $200,000)

 

2(x) Lawrence County

 

3(A) Construct new PM building at Lawrence
4County Maintenance Facility

 

5Project Allocation

825,000

6(Base Project Allocation - $750,000)

 

7(Design & Contingencies - $75,000)

 

8(xi) Lehigh County

 

9(A) Construct new vehicle wash building
10at Lehigh County Maintenance Garage

 

11Project Allocation

690,000

12(Base Project Allocation - $600,000)

 

13(Design & Contingencies - $90,000)

 

14(B) Renovate and expand Lehigh County
15Maintenance Garage to upgrade building
16systems and improve program
17requirements and energy efficiency

 

18Project Allocation

1,150,000

19(Base Project Allocation - $1,000,000)

 

20(Design & Contingencies - $150,000)

 

21(xii) Luzerne County

 

22(A) Develop new stockpile facility,
23including site purchase, design and
24construction

 

25Project Allocation

2,220,000

26(Base Project Allocation - $2,000,000)

 

27(Land Allocation - $20,000)

 

28(Design & Contingencies - $200,000)

 

29(xiii) Montgomery County

 

30(A) Renovate Montgomery County District

 

1Office by designing and constructing
2dry chemical fire protection system
3for TCC and all server rooms

 

4Project Allocation

440,000

5(Base Project Allocation - $400,000)

 

6(Design & Contingencies - $40,000)

 

7(B) Construct new garage parking deck at
8Montgomery County District Office

 

9Project Allocation

3,300,000

10(Base Project Allocation - $3,000,000)

 

11(Design & Contingencies - $300,000)

 

12(C) Renovate and expand Montgomery County
13Maintenance Garage to upgrade building
14systems and improve program
15requirements and energy efficiency

 

16Project Allocation

825,000

17(Base Program Allocation - $750,000)

 

18(Design & Contingencies - $75,000)

 

19(D) Renovate and expand District 6-0
20District Office to bring building into
21code compliance, upgrade buildings
22systems and improve program
23requirements and energy efficiency

 

24Project Allocation

2,200,000

25(Base Project Allocation - $2,000,000)

 

26(Design & Contingencies - $200,000)

 

27(xiv) Perry County

 

28(A) Develop new stockpile facility in
29Perry County, including site purchase,
30design and construction

 

1Project Allocation

2,220,000

2(Base Project Allocation - $2,000,000)

 

3(Land Allocation - $20,000)

 

4(Design & Contingencies - $200,000)

 

5(xv) Schuylkill County

 

6(A) Renovate and expand Schuylkill County
7Maintenance Garage to upgrade building
8systems and improve program
9requirements and energy efficiency

 

10Project Allocation

1,150,000

11(Base Project Allocation - $1,000,000)

 

12(Design & Contingencies - $150,000)

 

13(xvi) Washington County

 

14(A) Develop new stockpile facility,
15including site purchase, design and
16construction

 

17Project Allocation

2,220,000

18(Base Project Allocation - $2,000,000)

 

19(Land Allocation - $20,000)

 

20(Design & Contingencies - $200,000)

 

21(B) Develop new stockpile facility at
22Atlasburg, including site purchase,
23design and construction

 

24Project Allocation

2,220,000

25(Base Project Allocation - $2,000,000)

 

26(Land Allocation - $20,000)

 

27(Design & Contingencies - $200,000)

 

28(xvii) York County

 

29(A) Develop a new stockpile facility,
30including site purchase, design and

 

1construction

 

2Project Allocation

2,220,000

3(Base Project Allocation - $2,000,000)

 

4(Land Allocation - $20,000)

 

5(Design & Contingencies - $200,000)

 

6(B) Construct new vehicle wash building
7at York County Maintenance Garage

 

8Project Allocation

690,000

9(Base Project Allocation - $600,000)

 

10(Design & Contingencies - $90,000)

 

11(b) Port projects.--Additional capital projects in the
12category of improvement projects for ports to be constructed or
13acquired by the Department of Transportation, its successors or
14assigns, and to be financed by the incurring of debt, are hereby
15itemized, together with their respective estimated financial
16costs, as follows:

17 

18Project

Total Project

Allocation

19(1) Erie County

 

20(i) Erie Inland Port

 

21(A) Construct rail improvements and ship
22loading infrastructure at the Port of
23Erie

 

24Project Allocation

9,000,000

25(Base Project Allocation - $9,000,000)

 

26(B) Construct rail improvements and
27replace rail bridge at Erie Inland
28Port-Albion site

 

29Project Allocation

12,000,000

30(Base Project Allocation -

 

1$12,000,000)

 

2Section 4. Itemization of furniture and equipment projects.

3Additional capital projects in the category of public
4improvement projects consisting of the acquisition of movable
5furniture and equipment to complete public improvement projects
6and to be purchased by the Department of General Services, its
7successor or assigns and to be financed by the incurring of debt
8are hereby itemized, together with their respective estimated
9financial costs, as follows:

10 

11Project

Total Project

Allocation

12(1) Department of Conservation and Natural
13Resources

 

14(i) Kinzua Bridge State Park

 

15(A) Original furniture and equipment for
16new office/visitor center for public
17and staff use

 

18Project Allocation

3,000,000

19(Base Project Allocation - $2,400,000)

 

20(Design & Contingencies - $600,000)

 

21(ii) S. B. Elliott State Park

 

22(A) Additional funding for purchase of
23exhibits, furnishings and equipment
24for visitor center and overnight
25facilities

 

26Project Allocation

3,500,000

27(Base Project Allocation - $2,800,000)

 

28(Design & Contingencies - $700,000)

 

29(iii) Sinnemahoning State Park

 

30(A) Purchase of exhibits, furnishings and

 

1equipment for visitor center and
2office

 

3Project Allocation

2,000,000

4(Base Project Allocation - $1,600,000)

 

5(Design & Contingencies - $400,000)

 

6(2) Department of Education

 

7(i) Lincoln University

 

8(A) Original furniture and equipment
9associated with renovation of Center
10for the Study of Black Culture

 

11Project Allocation

4,000,000

12(Base Project Allocation - $3,200,000)

 

13(Design & Contingencies - $800,000)

 

14(ii) Temple University

 

15(A) Original furniture and equipment
16associated with renovation of
17Tomlinson Hall

 

18Project Allocation

450,000

19(Base Project Allocation - $360,000)

 

20(Design & Contingencies - $90,000)

 

21(B) Original furniture and equipment
22associated with design and
23construction of Center for Scholars

 

24Project Allocation

300,000

25(Base Project Allocation - $300,000)

 

26(iii) Thaddeus Stevens College of Technology

 

27(A) Original furniture and equipment
28associated with design and
29construction of technology center

 

30Project Allocation

2,000,000

1(Base Project Allocation - $2,000,000)

 

2(iv) The Pennsylvania State University

 

3(A) Original furniture and equipment for
4state-of-the-art research and teaching
5space for College of Liberal Arts

 

6Project Allocation

8,100,000

7(Base Project Allocation - $8,100,000)

 

8(B) Original furniture and equipment for
9building entrance and security systems
10project, including key access boxes
11and video surveillance cameras

 

12Project Allocation

1,500,000

13(Base Project Allocation - $1,500,000)

 

14(C) Original furniture and equipment for
15chilled water expansion project for
16University Park campus

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(D) Original furniture and equipment for
20new classroom/class lab building at
21University Park campus

 

22Project Allocation

7,700,000

23(Base Project Allocation - $7,700,000)

 

24(E) Additional funding for furniture and
25equipment for computer building at
26University Park campus

 

27Project Allocation

1,500,000

28(Base Project Allocation - $1,500,000)

 

29(F) Original furniture and equipment for
30general computing Tier III data center

 

1Project Allocation

13,000,000

2(Base Project Allocation -
3$13,000,000)

 

4(G) Additional funding for furniture and
5equipment for Henning Building

 

6Project Allocation

2,250,000

7(Base Project Allocation - $2,250,000)

 

8(H) Capital renewal for Kostos Building

 

9Project Allocation

1,800,000

10(Base Project Allocation - $1,800,000)

 

11(I) Capital renewal for Baker Engineering
12& Science Building

 

13Project Allocation

1,400,000

14(Base Project Allocation - $1,400,000)

 

15(J) Original furniture and equipment for
16new Recital Hall addition and Music I

 

17Project Allocation

3,300,000

18(Base Project Allocation - $3,300,000)

 

19(K) Original furniture and equipment for
20Ruhl Student/Community Center and
21multipurpose building upgrades

 

22Project Allocation

1,600,000

23(Base Project Allocation - $1,600,000)

 

24(L) Original furniture and equipment for
25Student Union Building at Brandywine

 

26Project Allocation

2,400,000

27(Base Project Allocation - $2,400,000)

 

28(M) Capital renewal for waste water
29treatment plant located at University
30Park campus

 

1Project Allocation

1,000,000

2(Base Project Allocation - $1,000,000)

 

3(N) Additional funding for furniture and
4equipment for water treatment plant
5located at University Park campus

 

6Project Allocation

1,000,000

7(Base Project Allocation - $1,000,000)

 

8(3) Pennsylvania Historical and Museum
9Commission

 

10(i) Landis Valley Village and Museum

 

11(A) Original furniture and equipment for
12new visitor center

 

13Project Allocation

1,500,000

14(Base Project Allocation - $1,500,000)

 

15(ii) Railroad Museum of Pennsylvania

 

16(A) Original equipment for new rolling
17stock storage facility

 

18Project Allocation

1,200,000

19(Base Project Allocation - $1,200,000)

 

20(4) State System of Higher Education

 

21(i) Bloomsburg University

 

22(A) Original furniture and equipment
23associated with renovation of
24McCormick Center

 

25Project Allocation

2,500,000

26(Base Project Allocation - $2,500,000)

 

27(ii) California University of Pennsylvania

 

28(A) Original furniture and equipment
29associated with renovation of Coover
30Hall

 

1Project Allocation

2,000,000

2(Base Project Allocation - $2,000,000)

 

3(B) Original furniture and equipment
4associated with renovation of South
5Hall and Old Main

 

6Project Allocation

3,500,000

7(Base Project Allocation - $3,500,000)

 

8(iii) Cheyney University

 

9(A) Original furniture and equipment
10associated with renovation of Cope
11Hall

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

14(iv) Clarion University

 

15(A) Original furniture and equipment
16associated with renovation of Marwick-
17Boyd Fine Arts Center

 

18Project Allocation

4,000,000

19(Base Project Allocation - $4,000,000)

 

20(v) East Stroudsburg University

 

21(A) Original furniture and equipment
22associated with construction of
23Information Commons

 

24Project Allocation

8,000,000

25(Base Project Allocation - $8,000,000)

 

26(vi) Indiana University of Pennsylvania

 

27(A) Original furniture and equipment
28associated with renovation of
29Stapleton/Stabley Library

 

30Project Allocation

5,000,000

1(Base Project Allocation - $5,000,000)

 

2(vii) Kutztown University

 

3(A) Original furniture and equipment
4associated with renovation of Lytle
5Hall

 

6Project Allocation

3,000,000

7(Base Project Allocation - $3,000,000)

 

8(B) Original furniture and equipment
9associated with renovation of Poplar
10House

 

11Project Allocation

1,000,000

12(Base Project Allocation - $1,000,000)

 

13(viii) Mansfield University

 

14(A) Original furniture and equipment
15associated with construction of new
16student housing

 

17Project Allocation

2,000,000

18(Base Project Allocation - $2,000,000)

 

19(ix) Slippery Rock University

 

20(A) Original furniture and equipment
21associated with renovation of Student
22Success Center

 

23Project Allocation

2,800,000

24(Base Project Allocation - $2,800,000)

 

25Section 5. Itemization of transportation assistance projects.

26(a) Mass transit.--Additional capital projects in the
27category of transportation assistance projects for mass transit
28in which an interest is to be acquired or constructed by the
29Department of Transportation, its successors or assigns and to
30be financed by the incurring of debt are hereby itemized,

1together with their estimated financial costs, as follows:

2 

3Project

Total Project

Allocation

4(1) Allegheny County

 

5(i) High-density redevelopment at new and
6existing transit stops along proposed Bus
7Rapid Transit Route and Lightrail and
8Busway stops in City of Pittsburgh

 

9Project Allocation

20,000,000

10(Base Project Allocation -
11$20,000,000)

 

12(2) Area Transportation Authority

 

13(i) Provide for facility and facility
14upgrades, including mobility management
15center, terminals, fuel storage, parking
16lots, fueling depots, roof replacement and
17miscellaneous equipment

 

18Project Allocation

2,253,000

19(Base Project Allocation - $2,028,000)

 

20(Design & Contingencies - $225,000)

 

21(ii) Upgrade and renovate Dubois facility to
22bring to state of good repair

 

23Project Allocation

959,000

24(Base Project Allocation - $863,000)

 

25(Design & Contingencies - $96,000)

 

26(iii) Construct terminals

 

27Project Allocation

1,162,000

28(Base Project Allocation - $1,162,000)

 

29(iv) Provide for Dubois facility improvements

 

30Project Allocation

425,000

1(Base Project Allocation - $425,000)

 

2(3) Butler Transit Authority

 

3(i) Expand Cranberry Area Park and Ride
4Facility on Route 528 near I-79, Butler
5County, including property acquisition and
6construction

 

7Project Allocation

450,000

8(Base Project Allocation - $405,000)

 

9(Design & Contingencies - $45,000)

 

10(ii) Provide for infrastructure improvements,
11facility upgrades for bus storage and
12maintenance areas, construction of public
13waiting area, training room, park and ride
14facility and compressed natural gas (CNG)
15refueling station and purchase of four 45-
16foot Coach CNG buses.

 

17Project Allocation

1,700,000

18(Base Project Allocation - $1,700,000)

 

19(4) Cambria County Transit Authority

 

20(i) Replace transit facility in Johnstown to
21meet current standards and requirements

 

22Project Allocation

2,419,000

23(Base Project Allocation - $2,177,000)

 

24(Design & Contingencies - $242,000)

 

25(ii) Construct transit facility

 

26Project Allocation

3,871,000

27(Base Project Allocation - $3,871,000)

 

28(iii) Construction and infrastructure
29improvements for new facility and bus
30replacement projects for Camtran

 

1Project Allocation

7,000,000

2(Base Project Allocation - $7,000,000)

 

3(5) Capital Area Transit Authority

 

4(i) Replace CAT's transit facility to meet
5modern requirements

 

6Project Allocation

7,742,000

7(Base Project Allocation - $6,968,000)

 

8(Design & Contingencies - $774,000)

 

9(ii) Upgrade transportation technology for
10vehicle monitoring and real-time
11information for CAT's transit operations

 

12Project Allocation

1,935,000

13(Base Project Allocation - $1,742,000)

 

14(Design & Contingencies - $193,000)

 

15(6) Centre Area Transportation Authority

 

16(i) Expand CATA's maintenance and bus storage
17areas

 

18Project Allocation

968,000

19(Base Project Allocation - $871,000)

 

20(Design & Contingencies - $97,000)

 

21(ii) Acquisition of replacement buses

 

22Project Allocation

1,600,000

23(Base Project Allocation - $1,600,000)

 

24(iii) Renovate current maintenance garage to
25create more useable space on current
26property

 

27Project Allocation

30,000,000

28(Base Project Allocation -
29$24,000,000)

 

30(Design & Contingencies - $6,000,000)

 

1(7) County of Lackawanna Transit System

 

2(i) Acquisition, construction, infrastructure
3and other costs related to compressed
4natural gas fueling station and
5maintenance facility

 

6Project Allocation

6,000,000

7(Base Project Allocation - $6,000,000)

 

8(ii) Acquisition, construction,
9infrastructure and other costs related to
10intermodal transportation center

 

11Project Allocation

1,000,000

12(Base Project Allocation - $1,000,000)

 

13(8) Crawford Area Transportation Authority

 

14(i) Construct steel structure sheltered bus
15storage facility and wash bay for bus
16fleet

 

17Project Allocation

387,000

18(Base Project Allocation - $348,000)

 

19(Design & Contingencies - $39,000)

 

20(9) Erie Municipal Transit Authority

 

21(i) Construct new operations facility,
22including infrastructure

 

23Project Allocation

1,796,000

24(Base Project Allocation - $1,616,000)

 

25(Design & Contingencies - $180,000)

 

26(10) Lehigh and Northampton Transportation
27Authority

 

28(i) Construct new operations facility,
29including infrastructure at Allentown
30operating facility

 

1Project Allocation

2,517,000

2(Base Project Allocation - $2,265,000)

 

3(Design & Contingencies - $252,000)

 

4(11) Mid-County Transit Authority

 

5(i) Construct bus storage facility

 

6Project Allocation

215,000

7(Base Project Allocation - $215,000)

 

8(12) Mid Mon Valley Transit Authority

 

9(i) Rehabilitate bus storage, phase II,
10including construction to rehabilitate
11existing bus storage, administration and
12passenger areas at Donora transit facility

 

13Project Allocation

1,160,000

14(Base Project Allocation - $1,044,000)

 

15(Design & Contingencies - $116,000)

 

16(ii) Construct Donora Phase II project

 

17Project Allocation

965,000

18(Base Project Allocation - $965,000)

 

19(13) Monroe County Transit Agency

 

20(i) Construct new bus storage facility and
21staging area

 

22Project Allocation

968,000

23(Base Project Allocation - $871,000)

 

24(Design & Contingencies - $97,000)

 

25(14) Montgomery County

 

26(i) Construction, infrastructure improvements
27and other costs related to expansion of
28Ardmore Train Station transit and parking
29improvements project

 

30Project Allocation

10,000,000

1(Base Project Allocation -
2$10,000,000)

 

3(15) Philadelphia County

 

4(i) Infrastructure improvements, including
5equipment upgrades for Phlash Trolley
6fleet

 

7Project Allocation

235,000

8(Base Project Allocation - $235,000)

 

9(16) Port Authority of Allegheny County

 

10(i) FY 2011-2012 Section 5307 Program,
11replacement and rehabilitation of major
12components of bus and fixed guideway
13system

 

14Project Allocation

7,341,000

15(Base Project Allocation - $6,607,000)

 

16(Design & Contingencies - $734,000)

 

17(ii) FY 2011-2012 Section 5309 Program,
18replacement and rehabilitation of major
19components within Port Authority's rail
20and busway system, including North Shore
21Connector project

 

22Project Allocation

6,000,000

23(Base Project Allocation - $5,400,000)

 

24(Design & Contingencies - $600,000)

 

25(iii) FY 2011-2012 Section 5307 Flex Program,
26to provide funding of 70 replacement buses
27and standardize bus procurement program

 

28Project Allocation

1,493,000

29(Base Project Allocation - 1,344,000)

 

30(Design & Contingencies - 149,000)

 

1(iv) FY 2011-2012 Section 5309 Bus and Bus
2Facilities Program, utilization of bus and
3bus facilities earmarks to perform various
4bus upgrades and facility improvements

 

5Project Allocation

1,161,000

6(Base Project Allocation - $1,045,000)

 

7(Design & Contingencies - $116,000)

 

8(v) Infrastructure Safety Renewal Program, to
9restore PAAC's transit and railroad
10infrastructure, including maintenance
11support facilities

 

12Project Allocation

16,000,000

13(Base Project Allocation -
14$14,400,000)

 

15(Design & Contingencies - $1,600,000)

 

16(vi) Vehicle Overhaul Program

 

17Project Allocation

2,500,000

18(Base Project Allocation - $2,250,000)

 

19(Design & Contingencies - $250,000)

 

20(vii) FY 2011-2012 Section 5307 Program, for
21replacement and rehabilitation of major
22components of bus and fixed guideway
23system

 

24Project Allocation

13,706,000

25(Base Project Allocation -
26$12,335,000)

 

27(Design & Contingencies - $1,371,000)

 

28(viii) FY 2011-2012 Section 5309 Program, for
29replacement and rehabilitation of major
30components within Port Authority's rail

 

1and busway system to ensure safety and
2reliability, including North Shore
3Connector project

 

4Project Allocation

11,756,000

5(Base Project Allocation -
6$10,580,000)

 

7(Design & Contingencies - $1,176,000)

 

8(ix) FY 2011-2012 Section 5307 Flex Program,
9to provide funding for match of Federal
10and local funding

 

11Project Allocation

1,493,000

12(Base Project Allocation - $1,344,000)

 

13(Design & Contingencies - $149,000)

 

14(x) FY 2011-2012 Section 5309 Bus and Bus
15Facilities Program, to provide for
16utilization of bus and bus facilities
17earmarks to perform various bus upgrades
18and facility improvements

 

19Project Allocation

1,403,000

20(Base Project Allocation - $1,263,000)

 

21(Design & Contingencies - $140,000)

 

22(xi) Infrastructure Safety Renewal Program,
23to provide funding to restore PAAC's
24transit and railroad infrastructure,
25including maintenance support facilities

 

26Project Allocation

30,000,000

27(Base Project Allocation -
28$27,000,000)

 

29(Design & Contingencies - $3,000,000)

 

30(xii) Vehicle Overhaul Program, to provide

 

1for PAAC's major overhaul of rolling stock

 

2Project Allocation

5,000,000

3(Base Project Allocation - $4,500,000)

 

4(Design & Contingencies - $500,000)

 

5(17) River Valley Transit

 

6(i) Expand Trade and Transit Center and
7Church Street Transportation Intermodal
8Center

 

9Project Allocation

1,161,000

10(Base Project Allocation - $1,045,000)

 

11(Design & Contingencies - $116,000)

 

12(ii) Expand Trade and Transit Center

 

13Project Allocation

1,459,000

14(Base Project Allocation - $1,313,000)

 

15(Design & Contingencies - $146,000)

 

16(iii) Construct compressed natural gas
17fueling station and purchase four CNG
18transit vehicles

 

19Project Allocation

1,042,000

20(Base Project Allocation - $937,800)

 

21(Design & Contingencies - $104,200)

 

22(18) Southeastern Pennsylvania Transportation
23Authority

 

24(i) FFY 2012 Section 5307 Formula Program of
25Prospects, including state of good repair,
26vehicle overhaul, regional rail signal
27mechanization, system improvements, bus
28purchase and paratransit vehicle purchase
29programs

 

30Project Allocation

23,831,000

1(Base Project Allocation -
2$21,448,000)

 

3(Design & Contingencies - $2,383,000)

 

4(ii) FFY 2012 Section 5309 Rail Modernization
5Program, including state of good repair,
6vehicle overhaul, regional rail signal
7mechanization, system improvements,
8transit and regional rail station and
9station accessibility programs

 

10Project Allocation

24,170,000

11(Base Project Allocation -
12$21,753,000)

 

13(Design & Contingencies - $2,417,000)

 

14(iii) FFY 2012 Bus Purchase Program,
15including acquisition and replacement of
16buses

 

17Project Allocation

4,133,000

18(Base Project Allocation - $3,720,000)

 

19(Design & Contingencies - $413,000)

 

20(iv) FFY 2012 Federal Highway Flex Program,
21including funds for SEPTA's
22railroad/highway grade crossings and for
23CMAQ projects that help meet requirements
24of the Clean Air Act

 

25Project Allocation

774,000

26(Base Project Allocation - $697,000)

 

27(Design & Contingencies - $77,000)

 

28(v) Federal Competitive Grant Program, to
29provide for State funds to match Federal
30capital funding awarded through

 

1competitive grant programs

 

2Project Allocation

15,839,000

3(Base Project Allocation -
4$14,255,000)

 

5(Design & Contingencies - $1,584,000)

 

6(vi) FY 2012-2013 State of Good Repair
7Program, to bring transit and railroad
8facilities to a state of good repair,
9including communications, track right-of-
10way, station facilities, environmental
11concerns and bridges

 

12Project Allocation

24,174,000

13(Base Project Allocation -
14$21,755,000)

 

15(Design & Contingencies - $2,419,000)

 

16(vii) Infrastructure Safety Renewal Program,
17to restore SEPTA's transit and railroad
18infrastructure, including maintenance
19support facilities

 

20Project Allocation

31,936,000

21(Base Project Allocation -
22$28,742,000)

 

23(Design & Contingencies - $3,194,000)

 

24(viii) FY 2011-2012 Vehicle Overhaul Program

 

25Project Allocation

53,226,000

26(Base Project Allocation -
27$47,903,000)

 

28(Design & Contingencies - $5,323,000)

 

29(ix) FFY 2013 Formula Program of Projects, to
30provide for SEPTA's State funds to match

 

1Federal capital funding to replace buses
2and rehabilitate various facilities and
3infrastructure to bring to state of good
4repair

 

5Project Allocation

23,226,000

6(Base Project Allocation -
7$20,903,000)

 

8(Design & Contingencies - $2,323,000)

 

9(x) FFY 2013 Rail Modernization Program, to
10provide for SEPTA's state of good repair
11program, vehicle overhaul program,
12regional rail signal mechanization, system
13improvements program, transit and regional
14rail station program and station
15accessibility program

 

16Project Allocation

23,226,000

17(Base Project Allocation -
18$20,903,000)

 

19(Design & Contingencies - $2,323,000)

 

20(xi) FFY 2013 Bus Purchase Program, to
21provide for acquisition and replacement of
22buses for SEPTA services

 

23Project Allocation

4,133,000

24(Base Project Allocation - $3,720,000)

 

25(Design & Contingencies - $413,000)

 

26(xii) Federal Competitive Grant Program, to
27provide for State funds to match Federal
28capital funding awarded through
29competitive grant programs by improving
30air quality and removing congestion

 

1Project Allocation

17,420,000

2(Base Project Allocation -
3$15,678,000)

 

4(Design & Contingencies - $1,742,000)

 

5(xiii) Federal Competitive Clean Fuel
6Program, to provide for State funds to
7match discretionary Federal capital
8funding to replace existing vehicles with
9clean fuel vehicles to bring to state of
10good repair

 

11Project Allocation

1,452,000

12(Base Project Allocation - $1,307,000)

 

13(Design & Contingencies - $145,000)

 

14(xiv) FY 2013-2014 Safety Renewal Program, to
15provide funds to rehabilitate or replace
16existing facilities and infrastructure to
17bring to state of good repair

 

18Project Allocation

33,872,000

19(Base Project Allocation -
20$30,485,000)

 

21(Design & Contingencies - $3,387,000)

 

22(xv) FY 2013-2014 State of Good Repair
23Program, to provide funds to rehabilitate
24or replace existing facilities and
25infrastructure to bring to state of good
26repair

 

27Project Allocation

19,356,000

28(Base Project Allocation -
29$17,420,000)

 

30(Design & Contingencies - $1,936,000)

 

1(xvi) Vehicle Overhaul Program, to provide
2for SEPTA's 2013-2014 Vehicle Overhaul
3Program which provides for major overhaul
4of rolling stock

 

5Project Allocation

53,227,000

6(Base Project Allocation -
7$47,904,000)

 

8(Design & Contingencies - $5,323,000)

 

9(xvii) FY 2012-2013 State of Good Repair
10Program, to provide funds to rehabilitate
11or replace existing facilities and
12infrastructure to bring to state of good
13repair

 

14Project Allocation

24,194,000

15(Base Project Allocation -
16$21,775,000)

 

17(Design & Contingencies - $2,419,000)

 

18(xviii) Infrastructure Safety Renewal
19Program, to provide for restoration of
20SEPTA's transit and railroad
21infrastructure, including maintenance
22support facilities

 

23Project Allocation

31,936,000

24(Base Project Allocation -
25$28,742,000)

 

26(Design & Contingencies - $3,194,000)

 

27(xix) Vehicle Overhaul Program, to provide
28for SEPTA's 2012-2013 Vehicle Overhaul
29Program which provides for major overhaul
30of rolling stock

 

1Project Allocation

53,227,000

2(Base Project Allocation -
3$47,904,000)

 

4(Design & Contingencies - $5,323,000)

 

5(xx) FY 2012-2013 Infrastructure Safety
6Renewal Program, to provide for
7restoration of SEPTA's transit and
8railroad infrastructure, including
9maintenance support facilities

 

10Project Allocation

31,936,000

11(Base Project Allocation -
12$28,742,000)

 

13(Design & Contingencies - $3,194,000)

 

14(xxi) Commuter rail expansion project, Phase
151 -- Elwyn to Wawa

 

16Project Allocation

16,500,000

17(Base Project Allocation -
18$15,000,000)

 

19(Design & Contingencies - $1,500,000)

 

20(xxii) Commuter rail expansion project, Phase
212 -- Wawa to West Chester

 

22Project Allocation

16,500,000

23(Base Project Allocation -
24$15,000,000)

 

25(Design & Contingencies - $1,500,000)

 

26(19) Department of Transportation

 

27(i) Vehicle and Capital Equipment Program, to
28provide funding match for non-Federal
29projects for purchase of transit vehicles
30and other capital equipment

 

1Project Allocation

50,000,000

2(Base Project Allocation -
3$45,000,000)

 

4(Design & Contingencies - $5,000,000)

 

5(ii) Provide funding for capital improvements
6and capital maintenance to Keystone
7Corridor, including interlockings and
8stations

 

9Project Allocation

15,000,000

10(Base Project Allocation -
11$13,500,000)

 

12(Design & Contingencies - $1,500,000)

 

13(iii) Vehicle and Capital Equipment Program,
14to provide funding match for Federal
15projects for purchase of transit vehicles
16and other capital equipment

 

17Project Allocation

50,000,000

18(Base Project Allocation -
19$45,000,000)

 

20(Design & Contingencies - $5,000,000)

 

21(20) York County Transportation Authority

 

22(i) Renovate transit operations
23center/maintenance facility

 

24Project Allocation

8,710,000

25(Base Project Allocation - $7,839,000)

 

26(Design & Contingencies - $871,000)

 

27(b) Rural and intercity rail.--Additional capital projects
28in the category of transportation assistance projects for rural
29and intercity rail service projects to be constructed or with
30respect to which an interest is to be acquired by the Department

1of Transportation, its successors or assigns and to be financed
2by the incurring of debt are hereby itemized, together with
3their respective estimated financial costs, as follows:

4 

5Project

Total Project

Allocation

6(1) Allegheny County

 

7(i) City of Pittsburgh

 

8(A) High-density redevelopment at new and
9existing transit stops along proposed
10Bus Rapid Transit Route and Lightrail
11and Busway stops in City of Pittsburgh

 

12Project Allocation

20,000,000

13(Base Project Allocation -
14$20,000,000)

 

15(ii) Three Rivers Marine & Rail Terminals

 

16(A) Rail rehabilitation, including track
17infrastructure improvements, upgrade
18ballast, ties and surface and align
19tracks for Glassport Terminal rail
20expansion project

 

21Project Allocation

1,500,000

22(Base Project Allocation - $1,500,000)

 

23(2) Allegheny, Fayette, Washington and
24Westmoreland Counties

 

25(i) Wheeling & Lake Erie Railroad

 

26(A) Upgrade existing infrastructure and
27construct new capacity for projected
28increases in car loadings and new
29customer development, including
30engineering, site preparation,

 

1grading, rail, ties, ballast,
2switches, signals, crossings, bridges,
3tunnels, slope stabilization and other
4related materials

 

5Project Allocation

10,000,000

6(Base Project Allocation -
7$10,000,000)

 

8(3) Allegheny, Butler and Washington Counties

 

9(i) Allegheny Valley Railroad

 

10(A) Rehabilitate and build railroad
11infrastructure to enhance operational
12capacity, including acquisition of
13land, planning and engineering, rail,
14crossties, roadbed, drainage,
15interchanges, lubricators, sidings,
16public delivery tracks, bridges,
17tunnels, crossings, freight yard
18modification and expansion

 

19Project Allocation

8,000,000

20(Base Project Allocation - $8,000,000)

 

21(ii) Pittsburgh and Ohio Central Railroad

 

22(A) Rehabilitation, including ties, rail,
23surface, bridge, switches, ditching,
24undercutting, brush cutting, road
25crossings, signal and communication
26and related work

 

27Project Allocation

4,900,000

28(Base Project Allocation - $4,900,000)

 

29(B) Rail construction or rehabilitation,
30including switches, ties, rail,

 

1surface, bridge, switches, ditching,
2undercutting, brush cutting, road
3crossings, signal and communication
4and related work

 

5Project Allocation

7,000,000

6(Base Project Allocation - $7,000,000)

 

7(4) Beaver County

 

8(i) Aliquippa and Ohio River Railroad

 

9(A) Rehabilitation, including ties, rail,
10surface, bridge, switches, ditching,
11undercutting, brush cutting, road
12crossings, signal and communication
13and related work

 

14Project Allocation

3,500,000

15(Base Project Allocation - $3,500,000)

 

16(B) Rail construction or rail
17rehabilitation for support of new or
18existing customers in Beaver County

 

19Project Allocation

7,000,000

20(Base Project Allocation - $7,000,000)

 

21(5) Berks County

 

22(i) City of Reading

 

23(A) Rehabilitation, construction and
24renovation of rail infrastructure to
25service Evergreen Community Power
26site, including track construction and
27rebuild, property and right-of-way
28acquisition, design, engineering,
29permitting, rails, ties, ballast,
30crossings, switches, turnouts, repair

 

1of grade crossings, track and other
2repairs and rebuilds, construction of
3rail service and any other related
4costs

 

5Project Allocation

5,000,000

6(Base Project Allocation - $5,000,000)

 

7(ii) Colebrookdale Railroad

 

8(A) Rehabilitation of historic Civil War
9Era railroad, including track
10improvements, siding extensions,
11passenger station development,
12equipment maintenance facility
13construction and related work

 

14Project Allocation

10,000,000

15(Base Project Allocation -
16$10,000,000)

 

17(iii) Richmond Township

 

18(A) Construction of an approximately
193,000 feet, three-track rail spur from
20Norfolk Southern eastbound mainline
21between Reading and Allentown to East
22Penn Manufacturing facility, including
23track, ties, rail, switches, surface,
24bridges, road crossing, drainage,
25grading and other associated
26improvements and costs

 

27Project Allocation

921,000

28(Base Project Allocation - $921,000)

 

29(6) Bucks County

 

30(i) Fairless Hills

 

1(A) Acquisition, infrastructure,
2redevelopment, construction and other
3related costs for Fairless Hills rail
4expansion project at the Keystone
5Industrial Port complex

 

6Project Allocation

5,750,000

7(Base Project Allocation - $5,750,000)

 

8(ii) Bucks County Industrial Development
9Authority

 

10(A) Acquisition, infrastructure,
11redevelopment, construction and other
12related costs to extend rail service
13to Riverside Industrial Park

 

14Project Allocation

2,100,000

15(Base Project Allocation - $2,100,000)

 

16(7) Cambria County

 

17(i) City of Johnstown

 

18(A) Rehabilitation, construction and
19renovation of rail infrastructure to
20service an economic development
21project related to or impacted by
22Marcellus Shale natural gas production
23located in the greater Johnstown area,
24including track construction and
25rebuild, property and right-of-way
26acquisition, design, engineering,
27permitting, rails, ties, ballast,
28crossings, switches, turnouts, repair
29of grade crossings, track and other
30repairs and rebuilds, construction of

 

1rail station and any other related
2costs

 

3Project Allocation

10,000,000

4(Base Project Allocation -
5$10,000,000)

 

6(8) Erie County

 

7(i) City of Erie

 

8(A) Construct rail improvements and ship
9loading infrastructure at the Port of
10Erie.

 

11Project Allocation

9,000,000

12(Base Project Allocation - $9,000,000)

 

13(B) Construct rail improvements and
14replace rail bridge at Erie Inland
15Port-Albion site.

 

16Project Allocation

12,000,000

17(Base Project Allocation -
18$12,000,000)

 

19(9) Fayette and Westmoreland Counties

 

20(i) Southwest Pennsylvania Railroad Company

 

21(A) Rehabilitate and build railroad
22infrastructure to enhance operational
23capacity, including acquisition of
24land, planning and engineering, rail,
25crossties, roadbed, drainage,
26interchanges, lubricators, sidings,
27public delivery tracks, bridges,
28crossings, freight yard modification
29and expansion

 

30Project Allocation

11,500,000

1(Base Project Allocation -
2$11,500,000)

 

3(10) Lackawanna County

 

4(i) Pocono Northeast Regional Railroad
5Authority

 

6(A) Purchase and install ties, ballast,
7raise, line and surface, bridge
8repairs, tunnel repairs, crossing
9rehabilitation and other related costs
10for Laurel Line Mainline project

 

11Project Allocation

1,500,000

12(Base Project Allocation - $1,500,000)

 

13(ii) Pennsylvania Northeast Regional Railroad
14Authority

 

15(A) Purchase and install ties, ballast,
16raise, line and surface, bridge
17repairs, tunnel repairs, crossing
18rehabilitation and other related costs
19for Carbondale Mainline

 

20Project Allocation

2,000,000

21(Base Project Allocation - $2,000,000)

 

22(B) Purchase and install ties, ballast,
23raise, line and surface, bridge
24repairs, tunnel repairs, crossing
25rehabilitation and other related costs
26for Pocono Mainline

 

27Project Allocation

1,250,000

28(Base Project Allocation - $1,250,000)

 

29(iii) County of Lackawanna Transit System

 

30(A) Acquisition, construction,

 

1infrastructure and other costs related
2to an intermodal transportation center

 

3Project Allocation

1,000,000

4(Base Project Allocation - $1,000,000)

 

5(11) Lancaster County

 

6(i) Strasburg Railroad

 

7(A) Land acquisition, engineering, rail,
8ties, ballast, crossings, transload
9equipment and other related costs for
10expansion of existing transload
11terminal and rail infrastructure

 

12Project Allocation

4,000,000

13(Base Project Allocation - $4,000,000)

 

14(12) Lycoming County

 

15(i) Brady Township

 

16(A) Construction, infrastructure,
17rehabilitation and other related costs
18to provide rail service to Timber Run
19Industrial Park for the express
20purpose of economic development of
21county-owned land

 

22Project Allocation

3,500,000

23(Base Project Allocation - $3,500,000)

 

24(ii) Jersey Shore Railroad

 

25(A) Rehabilitation of existing yard rail
26infrastructure and construction of
27additional track to increase capacity
28within the yard, including
29engineering, site preparation, rail,
30ties, ballast and grade crossings

 

1Project Allocation

3,500,000

2(Base Project Allocation - $3,500,000)

 

3(iii) Williamsport City

 

4(A) Track rehabilitation, new 
5construction and other related costs 
6to provide rail service to NuWeld 
7Corporation facility

 

8Project Allocation

350,000

9(Base Project Allocation - $350,000)

 

10(13) McKean County

 

11(i) American Refining Group

 

12(A) Rehabilitate existing rail
13infrastructure and construct new
14sidings to facilitate efficient and
15safe handling of petroleum and
16alternative fuel products, including
17engineering, site preparation,
18drainage, loading equipment, piping,
19rail, ties, ballast and other related
20materials

 

21Project Allocation

4,000,000

22(Base Project Allocation - $4,000,000)

 

23(ii) McKean County Economic Development

 

24(A) Acquisition, construction,
25rehabilitation, restoration,
26remediation, maintenance and
27infrastructure development and
28improvements for railroad development
29project

 

30Project Allocation

10,000,000

1(Base Project Allocation -
2$10,000,000)

 

3(14) Mifflin County

 

4(i) Mifflin County Industrial Development
5Authority

 

6(A) Infrastructure, rehabilitation,
7abatement of hazardous materials and
8other related costs for remediation of
9abandoned brownfield site and
10construction of new railroad
11infrastructure

 

12Project Allocation

2,000,000

13(Base Project Allocation - $2,000,000)

 

14(15) Monroe County

 

15(i) Pennsylvania Northeast Regional Railroad
16Authority

 

17(A) Purchase and install ties, ballast,
18raise, line and surface, bridge
19repairs, tunnel repairs, crossing
20rehabilitation and other related costs
21for Pocono Mainline

 

22Project Allocation

2,500,000

23(Base Project Allocation - $2,500,000)

 

24(16) Montgomery County

 

25(i) Montgomery County

 

26(A) Construction, infrastructure
27improvements and other costs related
28to expansion of Ardmore Train Station
29transit and parking improvements
30project

 

1Project Allocation

10,000,000

2(Base Project Allocation -
3$10,000,000)

 

4(17) Schuylkill County

 

5(i) Greater Tamaqua Industrial Development
6Enterprise

 

7(A) Infrastructure, rehabilitation and
8other related costs for Gordon
9Building rail spur project, including
10new rail and switches

 

11Project Allocation

140,000

12(Base Project Allocation - $140,000)

 

13(18) Washington County

 

14(i) Washington County

 

15(A) Acquisition, construction,
16infrastructure, redevelopment and
17other costs related to site
18improvement project at Mon River
19Industrial Park in Allenport Borough

 

20Project Allocation

10,000,000

21(Base Project Allocation -
22$10,000,000)

 

23(B) Acquisition, construction,
24infrastructure, redevelopment and
25other costs related to Zediker Station
26Business Park improvement project in
27South Strabane Township

 

28Project Allocation

10,000,000

29(Base Project Allocation -
30$10,000,000)

 

1(C) Acquisition, construction,
2infrastructure, redevelopment and
3other costs related to mixed-use
4business park

 

5Project Allocation

2,000,000

6(Base Project Allocation - $2,000,000)

 

7(D) Acquisition, construction,
8infrastructure, redevelopment and
9other costs related to development of
10pad-ready sites along the I-79 and
11Route 19 corridor

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

14(E) Acquisition, construction,
15infrastructure, redevelopment and
16other costs related to locating sites
17for support companies for natural gas
18industry

 

19Project Allocation

3,000,000

20(Base Project Allocation - $3,000,000)

 

21(F) Acquisition, construction,
22infrastructure, redevelopment and
23other costs related to redevelopment
24of former industrial sites for new and
25expanding businesses

 

26Project Allocation

5,000,000

27(Base Project Allocation - $5,000,000)

 

28(G) Acquisition, construction,
29infrastructure, redevelopment and
30other costs related to Mon Valley

 

1receiving and loading facility
2development project

 

3Project Allocation

5,000,000

4(Base Project Allocation - $5,000,000)

 

5(H) Acquisition, construction,
6infrastructure, redevelopment and
7other costs related to development of
8sites adjacent to Washington County
9Airport for aviation-related business
10park

 

11Project Allocation

10,000,000

12(Base Project Allocation -
13$10,000,000)

 

14(I) Acquisition, construction,
15infrastructure, redevelopment and
16other costs related to Skypointe
17business park

 

18Project Allocation

5,000,000

19(Base Project Allocation - $5,000,000)

 

20(19) Westmoreland County

 

21(i) Three Rivers Marine and Rail Terminal LP

 

22(A) Infrastructure, rehabilitation,
23construction and other related costs
24for rail track expansion, including
25addition of rail switches

 

26Project Allocation

750,000

27(Base Project Allocation - $750,000)

 

28(ii) Westmoreland County Industrial
29Development Corporation

 

30(A) Infrastructure, construction and

 

1other related costs for Southwest
2Pennsylvania Railroad rail
3rehabilitation project

 

4Project Allocation

1,000,000

5(Base Project Allocation - $1,000,000)

 

6(B) Infrastructure, construction and
7other related costs for Derry
8Porcelain Park Redevelopment project,
9including extension of rail spur
10service for industrial use

 

11Project Allocation

350,000

12(Base Project Allocation - $350,000)

 

13(20) Wyoming County

 

14(i) Procter and Gamble Paper Products Co.,
15Mehoopany Plant

 

16(A) Rehabilitate rail and existing
17infrastructure, including switches,
18signals, ties, ballast, rail, timbers,
19surfacing and other related materials

 

20Project Allocation

250,000

21(Base Project Allocation - $250,000)

 

22(21) Multiple Counties

 

23(i) D & I Silica, LLC

 

24(A) Improve and expand existing transload
25sites in Armstrong, Cameron, Elk,
26Fayette, Luzerne, McKean, Tioga and
27Warren Counties, including land
28acquisition, drainage, ditching, rail,
29ties, ballast, switches, grading,
30surfacing, gaging, unloading pits,

 

1transload equipment, truck staging and
2road access

 

3Project Allocation

5,500,000

4(Base Project Allocation - $5,500,000)

 

5(B) Establish new intermodal facilities
6to transload materials required by
7natural gas industry in Blair,
8Bradford, Butler, Centre, Clearfield,
9Clinton, Crawford, Erie, Indiana,
10Lawrence, Mercer, Venango,
11Westmoreland and Wyoming Counties,
12including land acquisition, site
13preparation, brush cutting, drainage,
14ditching, rail, ties, ballast,
15switches, grading, surfacing,
16unloading pits, transload equipment,
17truck staging and road access

 

18Project Allocation

10,000,000

19(Base Project Allocation -
20$10,000,000)

 

21(ii) SEDA-COG Joint Rail Authority

 

22(A) Railroad bridge upgrades, including
23load capacity increases in Columbia,
24Montour, Northumberland, Union,
25Lycoming, Clinton, Centre, Blair and
26Mifflin Counties

 

27Project Allocation

2,100,000

28(Base Project Allocation - $2,100,000)

 

29(B) Nittany & Bald Eagle Railroad yard
30upgrades and expansion, including

 

1construction of railroad tracks in
2Blair, Centre and Clinton Counties

 

3Project Allocation

2,800,000

4(Base Project Allocation - $2,800,000)

 

5(C) Shamokin City and yard
6rehabilitation, including roadbed,
7crossing surfaces, turnouts and
8related track work

 

9Project Allocation

3,150,000

10(Base Project Allocation - $3,150,000)

 

11(D) Lycoming Valley Railroad track
12upgrades and expansion, including
13construction of new storage tracks
14between Williamsport, Lycoming County,
15and South Avis, Clinton County

 

16Project Allocation

1,260,000

17(Base Project Allocation - $1,260,000)

 

18(E) Capital upgrades and other safety
19upgrades to eight railroad bridges in
20Blair, Centre, Columbia, Lycoming,
21Mifflin and Northumberland Counties
22for critical rail service on the
23Nittany & Bald Eagle, Juniata Valley,
24Lycoming Valley, North Shore and
25Shamokin Valley Railroads

 

26Project Allocation

3,500,000

27(Base Project Allocation - $3,500,000)

 

28(iii) North Shore Railroad

 

29(A) Retrofitting of diesel locomotives
30and other equipment to operate on

 

1alternative fuel sources or natural
2gas, or both, in Lycoming and
3Northumberland Counties

 

4Project Allocation

750,000

5(Base Project Allocation - $750,000)

 

6(B) Rehabilitation, infrastructure,
7construction and other related costs
8for equipment upgrades, installation
9of new technology and other upgrades
10to ensure Federal regulation
11compliance in Blair, Centre, Clinton,
12Columbia, Lycoming, Mifflin, Montour
13and Northumberland Counties

 

14Project Allocation

1,250,000

15(Base Project Allocation - $1,250,000)

 

16(iv) R. J. Corman Railroad Company

 

17(A) Rehabilitation of the rail line known
18as the Clearfield Cluster, located in
19Cambria, Centre, Clearfield, Clinton,
20Indiana and Jefferson Counties,
21including rail bed, ties, rail and
22other materials to support continued
23growth of business in these areas and
24reduction of truck traffic

 

25Project Allocation

20,000,000

26(Base Project Allocation -
27$20,000,000)

 

28(v) Southwest Pennsylvania Railroad

 

29(A) Rehabilitate and build railroad
30infrastructure to enhance operational

 

1capacity in Fayette and Westmoreland
2Counties, including acquisition of
3land, planning and engineering, rail,
4crossties, roadbed, drainage,
5interchanges, lubricators, sidings,
6public delivery tracks, bridges,
7crossings, freight yard modification
8and expansion

 

9Project Allocation

11,500,000

10(Base Project Allocation -
11$11,500,000)

 

12(c) Air transportation.--Additional capital projects in the
13category of transportation assistance projects for air
14transportation service to which an interest is to be acquired by
15the Department of Transportation, its successors or assigns and
16to be financed by the incurring of debt are hereby itemized,
17together with their respective estimated financial costs, as
18follows:

19 

20Project

Total Project

Allocation

21(1) Allegheny County

 

22(i) Allegheny County Airport Authority

 

23(A) Acquisition, construction,
24infrastructure and other related costs
25for aviation, industrial and
26commercial site development and
27improvements at or surrounding
28Allegheny County Airport

 

29Project Allocation

20,000,000

30(Base Project Allocation -

 

1$20,000,000)

 

2(B) Construction, infrastructure
3improvements and other costs related
4to development of de-icing fluid
5treatment facility at Pittsburgh
6International Airport

 

7Project Allocation

12,500,000

8(Base Project Allocation -
9$12,500,000)

 

10(C) Construction, infrastructure
11improvements and other costs related
12to development of Phase III of Clinton
13Commerce Center

 

14Project Allocation

15,000,000

15(Base Project Allocation -
16$15,000,000)

 

17(D) Construction, infrastructure
18improvements and other costs related
19to development of business park on
20site 7 at Pittsburgh International
21Airport

 

22Project Allocation

7,000,000

23(Base Project Allocation - $7,000,000)

 

24(E) Construction, infrastructure
25improvements and other costs related
26to development of Cherrington Commerce
27Center Phase II

 

28Project Allocation

10,000,000

29(Base Project Allocation -
30$10,000,000)

 

1(F) Acquisition, construction,
2infrastructure and other related costs
3for development of industrial and
4commercial sites at or surrounding
5Pittsburgh International Airport

 

6Project Allocation

50,000,000

7(Base Project Allocation -
8$50,000,000)

 

9(2) Armstrong County

 

10(i) McVille Airport

 

11(A) Acquisition, infrastructure,
12construction and other related costs
13for expansion of existing facilities
14and construction of access road, new
15hangars and helipad

 

16Project Allocation

1,500,000

17(Base Project Allocation - $1,500,000)

 

18(3) Bucks County

 

19(i) Bucks County Airport Authority

 

20(A) Infrastructure, construction and
21other related costs for airport
22improvements and upgrades at
23Quakertown Airport, including
24renovations to existing facilities and
25paving of parking lot and access roads

 

26Project Allocation

150,000

27(Base Project Allocation - $150,000)

 

28(B) Infrastructure, construction and
29other related costs for airport
30improvements and upgrades at

 

1Doylestown Airport, including
2demolition, infrastructure development
3and construction of administration
4building, aircraft storage hangar and
5aircraft maintenance hangar

 

6Project Allocation

1,500,000

7(Base Project Allocation - $1,500,000)

 

8(4) Carbon County

 

9(i) Carbon County Airport Authority

 

10(A) Construction of airport buildings,
11including general aviation terminal
12and snow removal equipment storage and
13aircraft storage hangars

 

14Project Allocation

4,500,000

15(Base Project Allocation - $4,500,000)

 

16(5) Chester County

 

17(i) Chester County Area Airport Authority

 

18(A) Infrastructure, construction and
19other related costs for Phase I of a
20hangar development expansion project

 

21Project Allocation

337,000

22(Base Project Allocation - $337,000)

 

23(6) Crawford County

 

24(i) Crawford County Regional Airport
25Authority

 

26(A) Design, engineer and other related
27costs for the construction of field
28hangar

 

29Project Allocation

1,500,000

30(Base Project Allocation - $1,500,000)

 

1(B) Design, engineer, and other related
2costs for construction of aircraft T
3hangars

 

4Project Allocation

1,000,000

5(Base Project Allocation - $1,000,000)

 

6(ii) Titusville Airport Authority

 

7(A) Runway expansion

 

8Project Allocation

1,000,000

9(Base Project Allocation - $1,000,000)

 

10(7) Lancaster County

 

11(i) Lancaster Airport Authority

 

12(A) Site development to include sewer
13pumping station and extended sewer
14lines

 

15Project Allocation

750,000

16(Base Project Allocation - $750,000)

 

17(8) Lycoming County

 

18(i) Williamsport Regional Airport

 

19(A) Design and construction of facility
20improvements, including directional
21signage, terminal building,
22renovations and parking

 

23Project Allocation

3,676,000

24(Base Project Allocation - $3,676,000)

 

25(B) Demolition of existing terminal
26building and other associated
27buildings, construction of new
28terminal building and other airport
29improvements

 

30Project Allocation

11,500,000

1(Base Project Allocation -
2$11,500,000)

 

3(9) Somerset County

 

4(i) Somerset County Airport

 

5(A) Replacement of existing underground
6aviation fuel storage tanks and
7dispensing units

 

8Project Allocation

400,000

9(Base Project Allocation - $400,000)

 

10(B) Construction of permanent location
11for medical helicopter base

 

12Project Allocation

400,000

13(Base Project Allocation - $400,000)

 

14(C) Construction of new hangars,
15improvements to existing hangars and
16acquisition of existing hangars

 

17Project Allocation

500,000

18(Base Project Allocation - $500,000)

 

19(10) Snyder County

 

20(i) Penn Valley Airport Authority

 

21(A) Acquisition, infrastructure and other
22related costs for development of
23aviation industrial park

 

24Project Allocation

750,000

25(Base Project Allocation - $750,000)

 

26(B) Infrastructure, construction and
27other related costs for construction
28of energy-efficient maintenance
29facility

 

30Project Allocation

850,000

1(Base Project Allocation - $850,000)

 

2(11) Washington County

 

3(i) Washington County Airport

 

4(A) Acquisition, construction,
5infrastructure, redevelopment and
6other costs related to development of
7sites adjacent to Washington County
8Airport for aviation-related business
9park

 

10Project Allocation

10,000,000

11(Base Project Allocation -
12$10,000,000)

 

13(ii) Skypointe Business Park

 

14(A) Acquisition, construction,
15infrastructure, redevelopment and
16other costs related to Skypointe
17business park

 

18Project Allocation

5,000,000

19(Base Project Allocation - $5,000,000)

 

20Section 6. Itemization of redevelopment assistance projects.

21(a) Additional capital projects in the category of
22redevelopment assistance projects for capital grants by the
23Department of Community and Economic Development, its successors
24or assigns, authorized under the provisions of the act of May
2520, 1949 (P.L.1633, No.493), known as the Housing and
26Redevelopment Assistance Law, and redevelopment assistance
27capital projects and to be financed by the incurring of debt,
28are hereby itemized, together with their estimated financial
29costs, as follows:

30 

 

1Project

Total Project




Allocation

2(1) Adams County

 

3(i) County projects

 

4(A) Design, infrastructure, construction
5and other related costs for the
6development of county-wide broadband
7infrastructure

 

8Project Allocation

5,000,000

9(Base Project Allocation - $5,000,000)

 

10(ii) Adams County Industrial Development
11Authority

 

12(A) Costs related to site preparations
13for lots within business park,
14including the blasting of diabase

 

15Project Allocation

500,000

16(Base Project Allocation - $500,000)

 

17(iii) Adams County Economic Development
18Corporation

 

19(A) Acquisition, construction and other
20related costs for new Head Start
21facility to provide educational and
22dental services to the community

 

23Project Allocation

1,000,000

24(Base Project Allocation - $1,000,000)

 

25(B) Rehabilitation, construction and
26other related costs for facilities
27expansion within professional center
28located in Cumberland Township

 

29Project Allocation

1,000,000

30(Base Project Allocation - $1,000,000)

 

1(C) Construction, infrastructure,
2acquisition and related development
3costs for commercial economic
4development project

 

5Project Allocation

5,000,000

6(Base Project Allocation - $5,000,000)

 

7(2) Allegheny County

 

8(i) County projects

 

9(A) Design, acquisition, infrastructure,
10construction and other related costs
11for redevelopment of Kelman Bottles
12plant, including equipment and system
13upgrades

 

14Project Allocation

2,500,000

15(Base Project Allocation - $2,500,000)

 

16(B) Acquisition, construction,
17infrastructure and other related costs
18for development of industrial and
19commercial sites at or surrounding
20Pittsburgh International Airport

 

21Project Allocation

50,000,000

22(Base Project Allocation -
23$50,000,000)

 

24(ii) City of Clairton

 

25(A) Acquisition, construction,
26infrastructure and other related costs
27for Clairton revitalization project

 

28Project Allocation

1,500,000

29(Base Project Allocation - $1,500,000)

 

30(iii) City of Pittsburgh

 

1(A) Construction, infrastructure
2improvements and other costs related
3to expansion of Women's Center and
4Shelter of Greater Pittsburgh

 

5Project Allocation

1,500,000

6(Base Project Allocation - $1,500,000)

 

7(B) Construction, infrastructure
8improvements and other costs related
9to mixed-use development of Eastside
10Campus of Chatham University

 

11Project Allocation

20,000,000

12(Base Project Allocation -
13$20,000,000)

 

14(C) Construction, infrastructure
15improvements and other costs related
16to office expansion building for The
17Andy Warhol Museum and Carnegie
18Museums of Pittsburgh

 

19Project Allocation

3,450,000

20(Base Project Allocation - $3,450,000)

 

21(D) Construction, infrastructure
22improvements and other costs related
23to Carnegie Science Center expansion
24project

 

25Project Allocation

15,000,000

26(Base Project Allocation -
27$15,000,000)

 

28(E) Acquisition, construction,
29infrastructure and other related costs
30for public park expansion project

 

1Project Allocation

5,000,000

2(Base Project Allocation - $5,000,000)

 

3(F) Acquisition, construction,
4infrastructure and other related costs
5for Pittsburgh Riverfront
6redevelopment projects

 

7Project Allocation

14,000,000

8(Base Project Allocation -
9$14,000,000)

 

10(G) Acquisition, construction,
11infrastructure and other related costs
12for Pittsburgh Advanced Technology
13Incubator development projects

 

14Project Allocation

10,000,000

15(Base Project Allocation -
16$10,000,000)

 

17(H) Acquisition, construction,
18infrastructure and other related costs
19for North Point Breeze redevelopment

 

20Project Allocation

1,000,000

21(Base Project Allocation - $1,000,000)

 

22(I) Acquisition, construction,
23infrastructure and other related costs
24for Larimer redevelopment neighborhood
25improvement project

 

26Project Allocation

5,000,000

27(Base Project Allocation - $5,000,000)

 

28(J) Acquisition, construction,
29infrastructure and other related costs
30for Homewood redevelopment mixed-use

 

1rehabilitation project

 

2Project Allocation

2,000,000

3(Base Project Allocation - $2,000,000)

 

4(K) Construction, infrastructure
5improvements and other related costs
6for Garfield redevelopment project

 

7Project Allocation

1,000,000

8(Base Project Allocation - $1,000,000)

 

9(L) Acquisition, construction,
10infrastructure and other related costs
11for Entrepreneur Resource Center
12project

 

13Project Allocation

6,000,000

14(Base Project Allocation - $6,000,000)

 

15(M) Acquisition, construction,
16infrastructure and other related costs
17for East Liberty redevelopment project

 

18Project Allocation

15,000,000

19(Base Project Allocation -
20$15,000,000)

 

21(N) Acquisition, construction,
22infrastructure and other related costs
23for Construction Junction project

 

24Project Allocation

4,000,000

25(Base Project Allocation - $4,000,000)

 

26(O) Acquisition, construction,
27infrastructure and other related costs
28for redevelopment of closed schools
29and historic churches into housing,
30office or commercial uses

 

1Project Allocation

2,000,000

2(Base Project Allocation - $2,000,000)

 

3(P) Demolition, acquisition,
4construction, infrastructure and other
5related costs for redevelopment of
6areas in Central Lawrenceville

 

7Project Allocation

5,500,000

8(Base Project Allocation - $5,500,000)

 

9(Q) Acquisition, construction,
10infrastructure and other related costs
11for Allegheny Riverfront redevelopment
12project

 

13Project Allocation

14,000,000

14(Base Project Allocation -
15$14,000,000)

 

16(R) Acquisition, construction,
17infrastructure and other related costs
18for Hill District Uptown redevelopment
19project

 

20Project Allocation

2,000,000

21(Base Project Allocation - $2,000,000)

 

22(S) Acquisition, construction,
23infrastructure and other related costs
24for Pittsburgh Neighborhood
25Connectivity project

 

26Project Allocation

200,000,000

27(Base Project Allocation -
28$200,000,000)

 

29(T) Acquisition, construction,
30infrastructure and other related costs

 

1for transit-oriented development
2projects

 

3Project Allocation

20,000,000

4(Base Project Allocation -
5$20,000,000)

 

6(U) Acquisition, construction,
7infrastructure and other related costs
8for Flashlight Factory Loft project

 

9Project Allocation

1,500,000

10(Base Project Allocation - $1,500,000)

 

11(V) Acquisition, construction,
12infrastructure and other related costs
13for Duquesne University renovation
14project

 

15Project Allocation

10,000,000

16(Base Project Allocation -
17$10,000,000)

 

18(W) Acquisition, construction,
19infrastructure and other related costs
20for University of Pittsburgh Medical
21Center Mercy projects

 

22Project Allocation

6,000,000

23(Base Project Allocation - $6,000,000)

 

24(X) Acquisition, construction,
25infrastructure and other related costs
26for University of Pittsburgh Medical
27Center Magee-Women's Hospital service
28line expansion project

 

29Project Allocation

6,000,000

30(Base Project Allocation - $6,000,000)

 

1(Y) Construction, infrastructure and
2other related costs for Pittsburgh
3Symphony Orchestra Heinz Hall
4renovation project

 

5Project Allocation

10,000,000

6(Base Project Allocation -
7$10,000,000)

 

8(Z) Construction, infrastructure and
9other related costs for Gardens at
10Market Square mixed-use development
11project

 

12Project Allocation

8,000,000

13(Base Project Allocation - $8,000,000)

 

14(AA) Acquisition, construction,
15infrastructure and other related costs
16for redevelopment of West
17Neighborhoods and Sheraden Market

 

18Project Allocation

7,000,000

19(Base Project Allocation - $7,000,000)

 

20(BB) Acquisition, construction,
21infrastructure and other related costs
22for Pittsburgh Civic Building Office
23relocation reinvestment project

 

24Project Allocation

10,000,000

25(Base Project Allocation -
26$10,000,000)

 

27(CC) Construction, infrastructure and
28other related costs for Pittsburgh
29Central Business District parking
30project

 

1Project Allocation

20,000,000

2(Base Project Allocation -
3$20,000,000)

 

4(DD) Acquisition, construction,
5infrastructure and other related costs
6for Parkway Center Mall redevelopment
7project

 

8Project Allocation

10,000,000

9(Base Project Allocation -
10$10,000,000)

 

11(EE) Demolition, acquisition,
12construction, infrastructure and
13related costs for the redevelopment of
14mixed-use development site in the
15neighborhood of Mount Washington

 

16Project Allocation

10,000,000

17(Base Project Allocation -
18$10,000,000)

 

19(FF) Construction, infrastructure and
20other related costs for Federal and
21North phase 2 project

 

22Project Allocation

2,000,000

23(Base Project Allocation - $2,000,000)

 

24(GG) Construction, infrastructure and
25other related costs for Downtown
26Pittsburgh revitalization project

 

27Project Allocation

20,000,000

28(Base Project Allocation -
29$20,000,000)

 

30(HH) Construction, infrastructure and

 

1other related costs for Downtown
2Preservation project phase 2

 

3Project Allocation

4,000,000

4(Base Project Allocation - $4,000,000)

 

5(II) Acquisition, construction,
6infrastructure and other related costs
7for redevelopment of former J. Allen
8Steel site in the Chateau neighborhood
9and in the adjacent Manchester
10neighborhood

 

11Project Allocation

18,000,000

12(Base Project Allocation -
13$18,000,000)

 

14(JJ) Construction, infrastructure and
15other related costs for Broadhead
16Industrial Park redevelopment project

 

17Project Allocation

10,000,000

18(Base Project Allocation -
19$10,000,000)

 

20(KK) Demolition, construction,
21restoration and related costs for
22commercial corridor in Beechview
23neighborhood

 

24Project Allocation

5,000,000

25(Base Project Allocation - $5,000,000)

 

26(LL) Construction, infrastructure and
27other related costs for Robert Morris
28University Student Recreation Center
29redevelopment project

 

30Project Allocation

5,000,000

1(Base Project Allocation - $5,000,000)

 

2(MM) Renovations, infrastructure,
3rehabilitation and other related costs
4for Robert Morris University Yorktown
5Hall

 

6Project Allocation

1,000,000

7(Base Project Allocation - $1,000,000)

 

8(NN) Acquisition, remediation,
9infrastructure development and related
10site preparation costs for
11redevelopment of former brownfield
12site in Squirrel Hill and Swisshelm
13Park neighborhoods

 

14Project Allocation

5,000,000

15(Base Project Allocation - $5,000,000)

 

16(OO) Acquisition, site preparation of
17parking garages and related
18infrastructure within the
19redevelopment sites of South Side
20Works and Pittsburgh Technology Center

 

21Project Allocation

15,000,000

22(Base Project Allocation -
23$15,000,000)

 

24(PP) Acquisition, remediation,
25construction, infrastructure and
26related site preparation costs in
27Hazelwood neighborhood

 

28Project Allocation

8,000,000

29(Base Project Allocation - $8,000,000)

 

30(QQ) Acquisition, construction,

 

1renovation, infrastructure and related
2activities in redevelopment of
3neighborhood of Carrick

 

4Project Allocation

5,500,000

5(Base Project Allocation - $5,500,000)

 

6(RR) Acquisition, remediation,
7construction, infrastructure and
8related activities for redevelopment
9of strategic brownfield sites

 

10Project Allocation

15,000,000

11(Base Project Allocation -
12$15,000,000)

 

13(SS) Construction, infrastructure and
14other related costs for Gateway Center
15Islands refurbishment redevelopment
16project

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(iv) Urban Redevelopment Authority of
20Pittsburgh

 

21(A) Acquisition, redevelopment and
22construction of property to support
23mixed-use development, parking garage
24and other infrastructure in Strip
25District

 

26Project Allocation

10,000,000

27(Base Project Allocation -
28$10,000,000)

 

29(v) Bridgeville Borough

 

30(A) Construction, infrastructure and

 

1other related costs for ACHIEVA's
2manufacturing facility expansion
3project

 

4Project Allocation

2,000,000

5(Base Project Allocation - $2,000,000)

 

6(vi) Findlay Township

 

7(A) Construction, infrastructure
8improvements and other costs related
9to development of de-icing fluid
10treatment facility at Pittsburgh
11International Airport

 

12Project Allocation

12,500,000

13(Base Project Allocation -
14$12,500,000)

 

15(B) Construction, infrastructure
16improvements and other costs related
17to development of Phase III of Clinton
18Commerce Center

 

19Project Allocation

15,000,000

20(Base Project Allocation -
21$15,000,000)

 

22(vii) McKees Rocks Borough

 

23(A) Construction, infrastructure and
24other related costs for Ohio Valley
25General Hospital Data and Information
26Technology Center

 

27Project Allocation

2,000,000

28(Base Project Allocation - $2,000,000)

 

29(viii) Moon Township

 

30(A) Construction, infrastructure

 

1improvements and other costs related
2to development of business park on
3site 7 at Pittsburgh International
4Airport

 

5Project Allocation

7,000,000

6(Base Project Allocation - $7,000,000)

 

7(B) Construction, infrastructure
8improvements and other costs related
9to development of Cherrington Commerce
10Center Phase II

 

11Project Allocation

10,000,000

12(Base Project Allocation -
13$10,000,000)

 

14(ix) Mt. Oliver Borough

 

15(A) Acquisition, construction,
16infrastructure and other related costs
17for Brownsville Road Corridor
18redevelopment projects

 

19Project Allocation

2,500,000

20(Base Project Allocation - $2,500,000)

 

21(x) Plum Borough

 

22(A) Construction, infrastructure
23improvements and other costs related
24to Plum Municipal Center

 

25Project Allocation

3,500,000

26(Base Project Allocation - $3,500,000)

 

27(xi) Robinson Township

 

28(A) Construction, infrastructure and
29other related costs for Bradley Center
30expansion project

 

1Project Allocation

500,000

2(Base Project Allocation - $500,000)

 

3(B) Acquisition, construction,
4infrastructure and other related costs
5for expansion of Industrial Scientific
6Global Headquarters

 

7Project Allocation

10,000,000

8(Base Project Allocation -
9$10,000,000)

 

10(xii) Ross Township

 

11(A) Acquisition, demolition,
12infrastructure and construction of
13public facilities in McKnight Road
14business corridor

 

15Project Allocation

2,250,000

16(Base Project Allocation - $2,250,000)

 

17(B) Acquisition, demolition,
18infrastructure and construction of
19public facilities for purposes of
20redevelopment of Northway Mall on
21McKnight Road

 

22Project Allocation

2,250,000

23(Base Project Allocation - $2,250,000)

 

24(C) Acquisition, demolition,
25infrastructure and construction of
26public facilities for parks,
27recreation and open space

 

28Project Allocation

4,000,000

29(Base Project Allocation - $4,000,000)

 

30(xiii) Sewickley Borough

 

1(A) Construction, infrastructure and
2other related costs for renovation of
35 South Patient Unit at Heritage
4Valley Sewickley Hospital facility

 

5Project Allocation

1,000,000

6(Base Project Allocation - $1,000,000)

 

7(B) Construction, infrastructure and
8other related costs for renovation and
9reconstruction of School of Nursing
10building at Heritage Valley Sewickley
11campus

 

12Project Allocation

1,000,000

13(Base Project Allocation - $1,000,000)

 

14(C) Construction, infrastructure and
15other related costs for the design,
16expansion and renovation of surgical
17services department at Heritage Valley
18Sewickley Hospital facility

 

19Project Allocation

1,000,000

20(Base Project Allocation - $1,000,000)

 

21(xiv) West Deer Township

 

22(A) Infrastructure, rehabilitation,
23construction and other related costs,
24including the abatement of hazardous
25materials, for development of senior
26citizen center

 

27Project Allocation

800,000

28(Base Project Allocation - $800,000)

 

29(xv) West Mifflin Borough

 

30(A) Acquisition, construction,

 

1infrastructure and other related costs
2for aviation, industrial and
3commercial site development and
4improvements at or surrounding
5Allegheny County Airport

 

6Project Allocation

20,000,000

7(Base Project Allocation -
8$20,000,000)

 

9(3) Armstrong County

 

10(i) County projects

 

11(A) Infrastructure, construction and
12other related costs for renovations to
13Belmont Complex indoor multiuse
14facility

 

15Project Allocation

1,500,000

16(Base Project Allocation - $1,500,000)

 

17(B) Acquisition, infrastructure,
18construction and other related costs,
19including abatement of hazardous
20materials, for public school buildings
21adaptive reuse project

 

22Project Allocation

2,000,000

23(Base Project Allocation - $2,000,000)

 

24(C) Acquisition, infrastructure,
25construction and other related costs
26for downtown revitalization projects,
27including façade improvements,
28landscaping, lighting, parking lots
29and streetscape improvements

 

30Project Allocation

2,000,000

1(Base Project Allocation - $2,000,000)

 

2(ii) Armstrong County Industrial Development
3Authority

 

4(A) Acquisition, infrastructure and
5construction for development of new
6industrial park

 

7Project Allocation

3,000,000

8(Base Project Allocation - $3,000,000)

 

9(4) Beaver County

 

10(i) Beaver County Corporation for Economic
11Development

 

12(A) Infrastructure, site improvements and
13other related costs for construction
14of compressed natural gas fueling
15facility

 

16Project Allocation

1,000,000

17(Base Project Allocation - $1,000,000)

 

18(B) Acquisition, infrastructure,
19abatement of hazardous materials,
20construction and other related costs
21for redevelopment of industrial
22properties located within Ellwood City

 

23Project Allocation

15,000,000

24(Base Project Allocation -
25$15,000,000)

 

26(C) Acquisition, infrastructure,
27abatement of hazardous materials,
28construction and other related costs
29for redevelopment and improvement of
30industrial sites located within Potter

 

1Township

 

2Project Allocation

15,000,000

3(Base Project Allocation -
4$15,000,000)

 

5(ii) Redevelopment Authority of Beaver County

 

6(A) Renovation and rehabilitation of
7patient rooms and corridors at
8Heritage Valley Beaver Hospital
9facility

 

10Project Allocation

1,000,000

11(Base Project Allocation - $1,000,000)

 

12(B) Rehabilitation, construction and
13other related costs for renovations to
14radiology department at Heritage
15Valley Beaver Hospital facility

 

16Project Allocation

1,000,000

17(Base Project Allocation - $1,000,000)

 

18(5) Bedford County

 

19(i) (Reserved)

 

20(6) Berks County

 

21(i) County projects

 

22(A) Acquisition, infrastructure,
23construction and other related costs
24for development of 104 acres for
25expansion of Reading Health System

 

26Project Allocation

3,500,000

27(Base Project Allocation - $3,500,000)

 

28(ii) Amity Township

 

29(A) Acquisition, infrastructure,
30construction and other related costs

 

1for development of retail and business
2park

 

3Project Allocation

1,300,000

4(Base Project Allocation - $1,300,000)

 

5(iii) Boyertown Borough

 

6(A) Construction, infrastructure and
7other related costs for rehabilitation
8of historic Civil War era railroad
9project

 

10Project Allocation

4,000,000

11(Base Project Allocation - $4,000,000)

 

12(iv) City of Reading

 

13(A) Construction, infrastructure and
14other related costs for early learning
15center at Albright College

 

16Project Allocation

1,500,000

17(Base Project Allocation - $1,500,000)

 

18(B) Construction, infrastructure and
19other related costs for Albright
20College Co-Generation Plant expansion
21project

 

22Project Allocation

2,500,000

23(Base Project Allocation - $2,500,000)

 

24(C) Construction, infrastructure and
25other related costs for Albright
26College Track and Field Facility
27project

 

28Project Allocation

1,500,000

29(Base Project Allocation - $1,500,000)

 

30(D) Construction, infrastructure and

 

1other related costs for Albright
2College Library Holocaust Resource
3Center project

 

4Project Allocation

500,000

5(Base Project Allocation - $500,000)

 

6(E) Renovation, restoration,
7reconstruction, infrastructure
8improvements and related costs for
9Reading Public Museum

 

10Project Allocation

1,112,000

11(Base Project Allocation - $1,112,000)

 

12(F) Construction, infrastructure
13improvements and other related costs
14for installation of natural gas
15refueling station at Evergreen
16Community Power site

 

17Project Allocation

5,000,000

18(Base Project Allocation - $5,000,000)

 

19(G) Construction, reconstruction,
20rehabilitation, remediation,
21infrastructure improvements and other
22related costs for redevelopment of
23existing building at Evergreen
24Community Power site

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(H) Rehabilitation, construction and
28renovation of rail infrastructure to
29service Evergreen Community Power
30site, including track construction and

 

1rebuild, property and right-of-way
2acquisition, design, engineering,
3permitting, rails, ties, ballast,
4crossings, switches, turnouts, repair
5of grade crossings, track and other
6repairs and rebuilds, construction of
7rail service and any other related
8costs

 

9Project Allocation

5,000,000

10(Base Project Allocation - $5,000,000)

 

11(v) Exeter Township

 

12(A) Construction, infrastructure and
13other related costs for Lincoln
14Business Park redevelopment project

 

15Project Allocation

5,000,000

16(Base Project Allocation - $5,000,000)

 

17(B) Construction, site preparation,
18infrastructure improvements and
19related costs for new Emergency
20Services Building

 

21Project Allocation

2,500,000

22(Base Project Allocation - $2,500,000)

 

23(vi) Fleetwood Borough

 

24(A) Acquisition, infrastructure,
25renovations and other related costs
26for Fleetwood Tannery/Fleetwood Auto
27Body Complex project

 

28Project Allocation

5,000,000

29(Base Project Allocation - $5,000,000)

 

30(B) Acquisition, infrastructure,

 

1renovations and other related costs
2for revitalization of Fleetwood
3Borough Central Business District

 

4Project Allocation

2,500,000

5(Base Project Allocation - $2,500,000)

 

6(vii) Muhlenberg Township

 

7(A) Acquisition, infrastructure,
8renovations and other related costs
9for NKG Metals facility redevelopment
10and reuse project

 

11Project Allocation

5,000,000

12(Base Project Allocation - $5,000,000)

 

13(B) Acquisition, infrastructure,
14renovations and other related costs
15for Fifth Street Highway Corridor
16revitalization project

 

17Project Allocation

10,000,000

18(Base Project Allocation -
19$10,000,000)

 

20(viii) West Reading Borough

 

21(A) Acquisition, infrastructure,
22renovations and other related costs
23for Reading Health System surgical
24tower and related facilities

 

25Project Allocation

3,500,000

26(Base Project Allocation - $3,500,000)

 

27(7) Blair County

 

28(i) Altoona-Blair County Development
29Corporation

 

30(A) Acquisition, abatement of hazardous

 

1materials, renovations and
2rehabilitation of regional arts center

 

3Project Allocation

2,000,000

4(Base Project Allocation - $2,000,000)

 

5(ii) Wyalusing Township

 

6(A) Acquisition, site preparation,
7remediation, infrastructure
8improvements and construction of
9Wyalusing Professional Park

 

10Project Allocation

8,000,000

11(Base Project Allocation - $8,000,000)

 

12(8) Bradford County

 

13(i) (Reserved)

 

14(9) Bucks County

 

15(i) County projects

 

16(A) Acquisition, construction,
17infrastructure, redevelopment and
18other related costs for ARIA Health
19System urgent care facilities

 

20Project Allocation

1,000,000

21(Base Project Allocation - $1,000,000)

 

22(B) Acquisition, construction,
23infrastructure, redevelopment and
24other related costs for ARIA Health
25System facilities to provide medical
26services, conduct research and other
27related activities

 

28Project Allocation

10,000,000

29(Base Project Allocation -
30$10,000,000)

 

1(C) Acquisition, infrastructure,
2redevelopment, construction and other
3related costs for Fairless Hills rail
4expansion project at Keystone
5Industrial Port Complex

 

6Project Allocation

5,750,000

7(Base Project Allocation - $5,750,000)

 

8(ii) Bucks County Industrial Development
9Authority

 

10(A) Acquisition, infrastructure,
11redevelopment and other related costs
12for construction of rail service to
13Riverside Industrial Park

 

14Project Allocation

2,100,000

15(Base Project Allocation - $2,100,000)

 

16(iii) Redevelopment Authority of Bucks County

 

17(A) Acquisition, infrastructure,
18construction and other related costs
19for rehabilitation of Grundy
20Powerhouse

 

21Project Allocation

525,000

22(Base Project Allocation - $525,000)

 

23(B) Acquisition, infrastructure,
24construction and other related costs
25for rehabilitation and development of
26PECO building in Penndel Borough

 

27Project Allocation

600,000

28(Base Project Allocation - $600,000)

 

29(C) Acquisition, infrastructure,
30construction and other related costs

 

1for redevelopment of Stocks Waterfront
2into mixed-use facility

 

3Project Allocation

780,000

4(Base Project Allocation - $780,000)

 

5(D) Acquisition, infrastructure,
6redevelopment, construction and other
7related costs for infrastructure
8improvements to Route 13 Industrial
9Corridor

 

10Project Allocation

1,100,000

11(Base Project Allocation - $1,100,000)

 

12(E) Acquisition, infrastructure,
13construction and other related costs
14for redevelopment of USI Lighting
15manufacturing site

 

16Project Allocation

1,200,000

17(Base Project Allocation - $1,200,000)

 

18(F) Infrastructure, construction and
19other related costs for improvements
20to Edgely Industrial Park, including
21roadways, storm water management,
22lighting and other infrastructure

 

23Project Allocation

1,200,000

24(Base Project Allocation - $1,200,000)

 

25(G) Acquisition, infrastructure,
26construction and other related costs
27for demolition of Mill Run Retirement
28Community and redevelopment of
29property

 

30Project Allocation

1,200,000

1(Base Project Allocation - $1,200,000)

 

2(H) Acquisition, demolition,
3infrastructure improvements,
4construction, renovation and other
5related costs for development of
6public/private academic university

 

7Project Allocation

4,000,000

8(Base Project Allocation - $4,000,000)

 

9(I) Infrastructure, construction,
10redevelopment and other related costs
11for senior housing project in Telford

 

12Project Allocation

10,000,000

13(Base Project Allocation -
14$10,000,000)

 

15(iv) Bensalem Township

 

16(A) Acquisition, infrastructure and other
17costs related to construction of new
18Newport fire house

 

19Project Allocation

1,500,000

20(Base Project Allocation - $1,500,000)

 

21(v) Chalfont Borough

 

22(A) Acquisition, construction,
23infrastructure, pedestrian
24enhancements and other costs related
25to transit-oriented development and
26downtown revitalization

 

27Project Allocation

10,000,000

28(Base Project Allocation -
29$10,000,000)

 

30(vi) Lower Southampton Township

 

1(A) Infrastructure, construction,
2renovations and other related costs
3for new public works building

 

4Project Allocation

1,000,000

5(Base Project Allocation - $1,000,000)

 

6(B) Acquisition, infrastructure,
7construction and other related costs
8for new police department headquarters

 

9Project Allocation

2,000,000

10(Base Project Allocation - $2,000,000)

 

11(vii) Middletown Township

 

12(A) Infrastructure, construction,
13rehabilitation and other related costs
14for roadway improvements to Big Oak
15Road, located within industrial park

 

16Project Allocation

600,000

17(Base Project Allocation - $600,000)

 

18(B) Infrastructure, construction and
19other related costs for rehabilitation
20of municipal building

 

21Project Allocation

1,000,000

22(Base Project Allocation - $1,000,000)

 

23(C) Acquisition, infrastructure,
24construction and other related costs
25for redevelopment of school buildings
26for future public use

 

27Project Allocation

2,000,000

28(Base Project Allocation - $2,000,000)

 

29(viii) Northampton Township

 

30(A) Acquisition, infrastructure,

 

1construction and other related costs
2for a new police department
3headquarters and renovations to
4existing facilities

 

5Project Allocation

2,500,000

6(Base Project Allocation - $2,500,000)

 

7(ix) Warwick Township

 

8(A) Acquisition, infrastructure,
9construction and other related costs
10for township building renovations and
11upgrades

 

12Project Allocation

1,000,000

13(Base Project Allocation - $1,000,000)

 

14(B) Infrastructure, construction,
15rehabilitation and other related costs
16for roadway improvements to Stout
17Drive, which provides ingress and
18egress to industrial park

 

19Project Allocation

1,500,000

20(Base Project Allocation - $1,500,000)

 

21(10) Butler County

 

22(i) Butler County Redevelopment Authority

 

23(A) Site preparation activity, including
24onsite utility construction, on
25property along SR 0019 in Jackson
26Township to support mixed-use
27development

 

28Project Allocation

10,000,000

29(Base Project Allocation -
30$10,000,000)

 

1(ii) Cranberry Township

 

2(A) Acquisition, infrastructure,
3rehabilitation and other related costs
4for construction of public plaza and
5other amenities in Route 228 corridor

 

6Project Allocation

1,000,000

7(Base Project Allocation - $1,000,000)

 

8(B) Acquisition, infrastructure,
9construction and other related costs
10for expansion of North Boundary Park

 

11Project Allocation

1,000,000

12(Base Project Allocation - $1,000,000)

 

13(C) Acquisition, infrastructure,
14construction, and other related costs,
15including abatement of hazardous
16materials, for Fernway redevelopment
17project

 

18Project Allocation

1,500,000

19(Base Project Allocation - $1,500,000)

 

20(D) Acquisition, construction, site
21development and infrastructure costs
22related to economic development
23project in Commonwealth and Executive
24Drive corridor

 

25Project Allocation

2,500,000

26(Base Project Allocation - $2,500,000)

 

27(E) Acquisition, infrastructure,
28rehabilitation and other related costs
29for construction of new public library

 

30Project Allocation

2,500,000

1(Base Project Allocation - $2,500,000)

 

2(F) Acquisition, rehabilitation, site
3development and infrastructure costs
4related to economic development
5project in Route 228 corridor

 

6Project Allocation

4,000,000

7(Base Project Allocation - $4,000,000)

 

8(G) Acquisition, rehabilitation, site
9development and infrastructure costs
10related to economic development
11project in Route 19 corridor

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

14(H) Acquisition, infrastructure,
15construction and other costs for
16redevelopment and implementation of
17Route 19 Main Street program

 

18Project Allocation

5,000,000

19(Base Project Allocation - $5,000,000)

 

20(iii) Zelienople Borough

 

21(A) Acquisition, infrastructure,
22construction and renovations of Main
23Street corridor as part of Central
24Business District revitalization
25project.

 

26Project Allocation

3,900,000

27(Base Project Allocation - $3,900,000)

 

28(11) Cambria County

 

29(i) Cambria Township

 

30(A) Construction, infrastructure and

 

1other related costs for Cambria County
2Prison improvement project

 

3Project Allocation

2,500,000

4(Base Project Allocation - $2,500,000)

 

5(ii) City of Johnstown

 

6(A) Construction, infrastructure and
7other related costs for Cambria County
8War Memorial improvement project

 

9Project Allocation

1,250,000

10(Base Project Allocation - $1,250,000)

 

11(iii) Ebensburg Borough

 

12(A) Construction, infrastructure and
13other related costs for Cambria County
14Courthouse renovation project

 

15Project Allocation

500,000

16(Base Project Allocation - $500,000)

 

17(iv) Loretto Borough

 

18(A) Construction, infrastructure and
19other related costs for renovation and
20expansion of Saint Francis University
21School of Health Sciences complex

 

22Project Allocation

10,000,000

23(Base Project Allocation -
24$10,000,000)

 

25(12) Cameron County

 

26(i) County projects

 

27(A) Acquisition, infrastructure,
28construction and other related costs
29for economic project in the county

 

30Project Allocation

10,000,000

1(Base Project Allocation -
2$10,000,000)

 

3(13) Carbon County

 

4(i) County projects

 

5(A) Site development, infrastructure,
6redevelopment, construction and other
7costs related to construction of
8educational facility in Carbon County

 

9Project Allocation

4,800,000

10(Base Project Allocation - $4,800,000)

 

11(B) Construction, site development,
12infrastructure and other costs related
13to construction of educational
14facility for Lehigh Carbon Community
15College

 

16Project Allocation

4,000,000

17(Base Project Allocation - $4,000,000)

 

18(C) Construction, infrastructure and
19other related costs for Blue Mountain
20Health Systems renovation projects at
21Palmerton Hospital and Gnaden Huetten
22Memorial Hospital campuses

 

23Project Allocation

1,000,000

24(Base Project Allocation - $1,000,000)

 

25(14) Centre County

 

26(i) County projects

 

27(A) Acquisition, infrastructure,
28construction and other related costs
29for wildlife education center

 

30Project Allocation

3,000,000

1(Base Project Allocation - $3,000,000)

 

2(B) Acquisition, infrastructure,
3construction and other related costs
4for development of expanded natural
5gas services

 

6Project Allocation

5,000,000

7(Base Project Allocation - $5,000,000)

 

8(C) Acquisition, infrastructure,
9construction and other related costs
10for rehabilitation and expansion of
11Memorial Field and Central Parklet,
12located in State College Borough

 

13Project Allocation

8,000,000

14(Base Project Allocation - $8,000,000)

 

15(D) Acquisition, infrastructure,
16construction and other related costs
17for centralized, all-inclusive YMCA
18multisports facility

 

19Project Allocation

10,000,000

20(Base Project Allocation -
21$10,000,000)

 

22(15) Chester County

 

23(i) County projects

 

24(A) Acquisition, infrastructure,
25renovations and other related costs
26for improvement to park facilities

 

27Project Allocation

5,000,000

28(Base Project Allocation - $5,000,000)

 

29(B) Acquisition, infrastructure,
30renovations, rehabilitation and other

 

1related costs for community
2revitalization projects

 

3Project Allocation

5,000,000

4(Base Project Allocation - $5,000,000)

 

5(C) Acquisition, infrastructure,
6renovations, rehabilitation and other
7related costs for economic development
8projects

 

9Project Allocation

5,000,000

10(Base Project Allocation - $5,000,000)

 

11(D) Construction, infrastructure and
12other related costs for Valley Forge
13Christian College Athletic Facilities
14expansion project

 

15Project Allocation

2,000,000

16(Base Project Allocation - $2,000,000)

 

17(ii) Chester County Economic Development
18Council

 

19(A) Acquisition, infrastructure,
20construction, streetscape
21improvements, industrial and
22commercial site development and other
23capital revitalization in Borough of
24Kennett Square

 

25Project Allocation

10,000,000

26(Base Project Allocation -
27$10,000,000)

 

28(B) Acquisition, infrastructure,
29construction, commercial development
30and other related costs for Route 1

 

1corridor in southern Chester County

 

2Project Allocation

15,000,000

3(Base Project Allocation -
4$15,000,000)

 

5(iii) Chester County Industrial Development
6Authority

 

7(A) Acquisition, infrastructure,
8construction and other related costs
9for development of commercial center
10in East Brandywine Township

 

11Project Allocation

2,500,000

12(Base Project Allocation - $2,500,000)

 

13(B) Acquisition, demolition,
14infrastructure, construction and other
15related costs, including abatement of
16hazardous materials, for multisite,
17transit-oriented redevelopment project
18in City of Coatesville. Redevelopment
19to include reconstruction of
20infrastructure, renovation of historic
21facilities and new construction

 

22Project Allocation

10,000,000

23(Base Project Allocation -
24$10,000,000)

 

25(iv) East Whiteland Township

 

26(A) Construction, infrastructure
27improvements and other costs related
28to People's Theatre Phase III
29expansion project

 

30Project Allocation

1,000,000

1(Base Project Allocation - $1,000,000)

 

2(B) Construction, infrastructure
3improvements and other costs related
4to Immaculata University building
5projects

 

6Project Allocation

8,000,000

7(Base Project Allocation - $8,000,000)

 

8(v) Malvern Borough

 

9(A) Construction, infrastructure,
10acquisition and related costs
11associated with reuse and development
12projects

 

13Project Allocation

5,000,000

14(Base Project Allocation - $5,000,000)

 

15(vi) Phoenixville Borough

 

16(A) Construction, infrastructure
17improvements and other costs related
18to Colonial Theatre expansion project

 

19Project Allocation

4,000,000

20(Base Project Allocation - $4,000,000)

 

21(B) Construction, infrastructure,
22acquisition and related costs for
23development and expansion of
24Downingtown Transportation Center

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(C) Mixed-use development, including
28construction, infrastructure,
29acquisition and related costs at
30former Phoenix Steel site

 

1Project Allocation

5,000,000

2(Base Project Allocation - $5,000,000)

 

3(vii) Upper Uwchlan Township

 

4(A) Construction, infrastructure and
5other related costs for roadway
6reconstruction, landscaping and
7streetscape improvements to
8Pennsylvania Drive and Stockton Drive,
9located within Hankin's Eagleview

 

10Project Allocation

700,000

11(Base Project Allocation - $700,000)

 

12(B) Construction and other related costs
13for renovations and rehabilitation of
14barn located in Upland Farms Park, to
15be utilized as local community center

 

16Project Allocation

910,000

17(Base Project Allocation - $910,000)

 

18(viii) Uwchlan Township

 

19(A) Construction, infrastructure and
20other related costs for improvement
21and expansion of Eagleview complex

 

22Project Allocation

10,000,000

23(Base Project Allocation -
24$10,000,000)

 

25(ix) West Chester Borough

 

26(A) Acquisition, construction,
27infrastructure and other related costs
28for Borough of West Chester multiuse
29theater project

 

30Project Allocation

500,000

1(Base Project Allocation - $500,000)

 

2(B) Acquisition, construction,
3infrastructure and other related costs
4for West Chester Borough redevelopment
5projects

 

6Project Allocation

7,000,000

7(Base Project Allocation - $7,000,000)

 

8(C) Acquisition, construction,
9infrastructure and other related costs
10for former biopharma site
11redevelopment projects

 

12Project Allocation

2,500,000

13(Base Project Allocation - $2,500,000)

 

14(16) Clarion County

 

15(i) (Reserved)

 

16(17) Clearfield County

 

17(i) County projects

 

18(A) Acquisition, infrastructure,
19construction and other related costs
20for economic project

 

21Project Allocation

10,000,000

22(Base Project Allocation -
23$10,000,000)

 

24(18) Clinton County

 

25(i) County projects

 

26(A) Acquisition, infrastructure,
27construction and other related costs
28for economic project

 

29Project Allocation

10,000,000

30(Base Project Allocation -

 

1$10,000,000)

 

2(19) Columbia County

 

3(i) (Reserved)

 

4(20) Crawford County

 

5(i) County projects

 

6(A) Acquisition, infrastructure, and
7construction of trail segments
8advancing Erie-to-Pittsburgh trail
9corridor and closing existing gaps

 

10Project Allocation

1,000,000

11(Base Project Allocation - $1,000,000)

 

12(B) Acquisition, infrastructure,
13construction and renovations of
14existing or needed infrastructure
15promoting economic development

 

16Project Allocation

2,000,000

17(Base Project Allocation - $2,000,000)

 

18(ii) Conneaut Valley Economic and Industrial
19Development Authority

 

20(A) Acquisition, rehabilitation,
21construction and other related costs,
22including abatement of hazardous
23materials, for regional economic
24development project in downtown
25Conneautville Borough

 

26Project Allocation

1,500,000

27(Base Project Allocation - $1,500,000)

 

28(iii) Economic Progress Alliance of Crawford
29County

 

30(A) Acquisition, infrastructure

 

1improvements, site planning,
2renovation, remediation, construction
3and other related costs for continued
4development of Linesville Business
5Park

 

6Project Allocation

1,000,000

7(Base Project Allocation - $1,000,000)

 

8(B) Acquisition, infrastructure
9improvements, site planning,
10renovation, remediation, construction
11and other related costs for continued
12development of Bessemer Street in City
13of Meadville

 

14Project Allocation

1,000,000

15(Base Project Allocation - $1,000,000)

 

16(C) Acquisition, infrastructure
17improvements, site planning,
18renovation, remediation, construction
19and other related costs for continued
20development of Crawford Woodlands in
21Vernon Township

 

22Project Allocation

2,000,000

23(Base Project Allocation - $2,000,000)

 

24(D) Acquisition, infrastructure,
25construction and other related costs
26for redevelopment and expansion of
27Meadville Medical Center

 

28Project Allocation

25,000,000

29(Base Project Allocation -
30$25,000,000)

 

1(iv) Redevelopment Authority of the City of
2Meadville

 

3(A) Acquisition, infrastructure,
4construction and other related costs
5for renovations and redevelopment of
6various land parcels and commercial
7properties located within City of
8Meadville

 

9Project Allocation

2,500,000

10(Base Project Allocation - $2,500,000)

 

11(v) Titusville Redevelopment Authority

 

12(A) Infrastructure, construction and
13redevelopment of properties along
14Titusville portion of Erie-to-
15Pittsburgh trail

 

16Project Allocation

500,000

17(Base Project Allocation - $500,000)

 

18(B) Acquisition, rehabilitation,
19construction and other related costs,
20including abatement of hazardous
21materials, for redevelopment of
22blighted properties located within
23City of Titusville

 

24Project Allocation

1,000,000

25(Base Project Allocation - $1,000,000)

 

26(C) Infrastructure, renovation and
27redevelopment of several steel mill
28buildings for conversion into
29multitenant industrial building

 

30Project Allocation

1,500,000

1(Base Project Allocation - $1,500,000)

 

2(D) Infrastructure and other related
3costs for construction of five light
4manufacturing incubators, including
5new buildings, loading docks, rail
6spur and rail sidings

 

7Project Allocation

2,000,000

8(Base Project Allocation - $2,000,000)

 

9(21) Cumberland County

 

10(i) Borough of Shippensburg

 

11(A) Acquisition, infrastructure,
12construction and other costs related
13to Dykeman Road extension project
14located within industrial park

 

15Project Allocation

2,500,000

16(Base Project Allocation - $2,500,000)

 

17(B) Renovations, redevelopment and other
18related costs for design, construction
19and development of community center

 

20Project Allocation

1,000,000

21(Base Project Allocation - $1,000,000)

 

22(22) Dauphin County

 

23(i) County projects

 

24(A) Construction and other related costs
25for improvement of infrastructure in
26City of Harrisburg and other
27surrounding communities

 

28Project Allocation

24,000,000

29(Base Project Allocation -
30$24,000,000)

 

1(B) Acquisition, construction,
2infrastructure and other related costs
3for Union House Apartment adaptive
4reuse project

 

5Project Allocation

1,000,000

6(Base Project Allocation - $1,000,000)

 

7(ii) City of Harrisburg

 

8(A) Acquisition, construction,
9infrastructure and other related costs
10for Greenwood Business Center
11incubator project

 

12Project Allocation

1,500,000

13(Base Project Allocation - $1,500,000)

 

14(iii) Derry Township

 

15(A) Acquisition, construction,
16infrastructure and other related costs
17for Vista Foundation Autism Spectrum
18Disorder project

 

19Project Allocation

350,000

20(Base Project Allocation - $350,000)

 

21(iv) Londonderry Township

 

22(A) Construction, infrastructure and
23other related costs for water service
24infrastructure for commercial and
25industrial projects

 

26Project Allocation

1,000,000

27(Base Project Allocation - $1,000,000)

 

28(v) Swatara Township

 

29(A) Acquisition, construction,
30infrastructure and other related costs

 

1for Swatara Gardens senior housing
2project

 

3Project Allocation

1,000,000

4(Base Project Allocation - $1,000,000)

 

5(23) Delaware County

 

6(i) County projects

 

7(A) Acquisition, infrastructure,
8construction and other related costs
9for commercial development of housing,
10retail and other mixed uses at Widener
11University

 

12Project Allocation

2,000,000

13(Base Project Allocation - $2,000,000)

 

14(B) Delaware County Housing Authority,
15acquisition, infrastructure,
16redevelopment, construction, abatement
17of hazardous materials and other
18related costs for development of
19properties in Ridley Township and
20Nether Providence Township

 

21Project Allocation

1,500,000

22(Base Project Allocation - $1,500,000)

 

23(ii) Delaware County Industrial Development
24Authority

 

25(A) Infrastructure, construction and
26other related costs for revitalization
27of former Sears site

 

28Project Allocation

4,200,000

29(Base Project Allocation - $4,200,000)

 

30(B) Infrastructure, construction, public

 

1utility upgrades and other related
2costs for Chadds Ford redevelopment
3project

 

4Project Allocation

5,000,000

5(Base Project Allocation - $5,000,000)

 

6(C) Acquisition, site preparation,
7infrastructure and construction costs
8related to mixed-use redevelopment
9project to be located adjacent to
10Cardinal O'Hara High School

 

11Project Allocation

20,000,000

12(Base Project Allocation -
13$20,000,000)

 

14(iii) Delaware County Redevelopment Authority

 

15(A) Site preparation, installation of
16public utilities and related
17facilities, construction and
18installation of sidewalks and fencing
19and other related costs for
20multipurpose athletic facility at
21Cardinal O'Hara High School

 

22Project Allocation

300,000

23(Base Project Allocation - $300,000)

 

24(B) Infrastructure, renovations,
25construction and other related costs
26for rehabilitation of former school
27building to accommodate day program
28services

 

29Project Allocation

500,000

30(Base Project Allocation - $500,000)

 

1(C) Acquisition, infrastructure,
2construction and other related costs
3for development of integrated
4ambulatory center for Mercy Health
5System to provide expanded access to
6primary care, specialty care and
7diagnostic services

 

8Project Allocation

1,750,000

9(Base Project Allocation - $1,750,000)

 

10(D) Infrastructure, construction,
11renovation and other related costs for
12expansion of Neumann University's
13Bruder Student Life Center

 

14Project Allocation

3,000,000

15(Base Project Allocation - $3,000,000)

 

16(E) Acquisition, design, infrastructure,
17construction, renovation and other
18related costs for construction of
19safety cross-over bridge project,
20connecting Neumann University's main
21campus to student center and residence
22housing

 

23Project Allocation

3,000,000

24(Base Project Allocation - $3,000,000)

 

25(F) Acquisition, infrastructure,
26construction and other related costs
27for rehabilitation and renovation of
28the historic Deshong Museum and
29mansion

 

30Project Allocation

5,000,000

1(Base Project Allocation - $5,000,000)

 

2(G) Acquisition, design, infrastructure,
3construction and other related costs
4for access ramp, within Crozer-Chester
5Medical Center, to allow for ingress
6and regress

 

7Project Allocation

10,000,000

8(Base Project Allocation -
9$10,000,000)

 

10(H) Acquisition, infrastructure,
11redevelopment, construction, abatement
12of hazardous materials and other
13related costs for redevelopment of
14properties in Penn Hills area of
15Ridley Township

 

16Project Allocation

2,500,000

17(Base Project Allocation - $2,500,000)

 

18(iv) City of Chester

 

19(A) Acquisition, infrastructure,
20construction and other related costs
21for renovation and rehabilitation of
22historic 1724 Old Chester Courthouse
23and courtyard

 

24Project Allocation

3,000,000

25(Base Project Allocation - $3,000,000)

 

26(v) Borough of Eddystone

 

27(A) Acquisition, infrastructure,
28construction and other related costs
29for renovation and rehabilitation of
30Eddystone Fire House and Evacuation

 

1Center

 

2Project Allocation

1,000,000

3(Base Project Allocation - $1,000,000)

 

4(vi) Radnor Township

 

5(A) Construction, renovation and
6rehabilitation of capital facilities,
7including infrastructure on campus of
8Cabrini College

 

9Project Allocation

10,000,000

10(Base Project Allocation -
11$10,000,000)

 

12(24) Elk County

 

13(i) County projects

 

14(A) Acquisition, infrastructure,
15construction and other related costs
16for economic project

 

17Project Allocation

10,000,000

18(Base Project Allocation -
19$10,000,000)

 

20(25) Erie County

 

21(i) Boroughs of Albion and Crainesville;
22Conneaut and Elk Creek

 

23(A) Construct rail improvements and
24replace rail bridge at Erie Inland
25Port-Albion site

 

26Project Allocation

12,000,000

27(Base Project Allocation -
28$12,000,000)

 

29(ii) Corry Area Industrial Development
30Corporation

 

1(A) Acquisition, redevelopment and
2rehabilitation of vacant industrial
3facility to be converted to
4multitenant manufacturing facilities

 

5Project Allocation

2,500,000

6(Base Project Allocation - $2,500,000)

 

7(iii) Economic Development Corporation of
8Erie County

 

9(A) Infrastructure, construction,
10redevelopment and other related costs
11for improvement of former potato chip
12factory

 

13Project Allocation

1,000,000

14(Base Project Allocation - $1,000,000)

 

15(iv) Erie City

 

16(A) Construction, infrastructure and
17other related costs for Stairways
18Behavioral Health neighborhood
19revitalization project

 

20Project Allocation

5,100,000

21(Base Project Allocation - $5,100,000)

 

22(B) Construct rail improvements and ship
23loading infrastructure at Port of Erie

 

24Project Allocation

9,000,000

25(Base Project Allocation - $9,000,000)

 

26(26) Fayette County

 

27(i) Bullskin Township

 

28(A) Construction, infrastructure and
29other costs related to Fay/West Soccer
30Complex indoor facility project

 

1Project Allocation

2,500,000

2(Base Project Allocation - $2,500,000)

 

3(ii) City of Uniontown

 

4(A) Acquisition, infrastructure,
5construction and other related costs
6for development of White Swan
7Apartments

 

8Project Allocation

750,000

9(Base Project Allocation - $750,000)

 

10(27) Forest County

 

11(i) (Reserved)

 

12(28) Franklin County

 

13(i) Franklin County Redevelopment Authority

 

14(A) Acquisition, construction,
15infrastructure and other related costs
16for economic development project in
17the county

 

18Project Allocation

2,000,000

19(Base Project Allocation - $2,000,000)

 

20(B) Infrastructure, construction and
21other related costs for renovation and
22rehabilitation of John Steward
23Memorial Library on Wilson College
24campus

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(C) Acquisition, infrastructure,
28construction and other related costs
29for redevelopment of former Scotland
30School for Veterans' Children campus,

 

1including construction of educational
2and other use facilities

 

3Project Allocation

7,500,000

4(Base Project Allocation - $7,500,000)

 

5(D) Acquisition, infrastructure,
6construction and other costs related
7to renovations and improvements at
8hospital facilities and entities in
9the county

 

10Project Allocation

15,000,000

11(Base Project Allocation -
12$15,000,000)

 

13(ii) Chambersburg Borough

 

14(A) Acquisition, infrastructure, design,
15engineering, renovations,
16rehabilitation, construction, utility
17relocation, traffic improvements,
18traffic signal upgrades and other
19related costs for upgrading municipal
20electric systems throughout this
21Commonwealth

 

22Project Allocation

7,000,000

23(Base Project Allocation - $7,000,000)

 

24(B) Acquisition, infrastructure, design,
25engineering, renovations,
26rehabilitation, construction, utility
27relocation, traffic improvements,
28traffic signal upgrades and other
29related costs for creating distributed
30natural gas generation facilities at

 

1municipal electric systems throughout
2this Commonwealth

 

3Project Allocation

7,000,000

4(Base Project Allocation - $7,000,000)

 

5(iii) Borough of Shippensburg

 

6(A) Construction, rehabilitation and
7other related costs for improvements
8to Memorial Park Stadium

 

9Project Allocation

2,500,000

10(Base Project Allocation - $2,500,000)

 

11(iv) Borough of Waynesboro

 

12(A) Acquisition, construction,
13infrastructure and other related costs
14for economic development project in
15Borough of Waynesboro

 

16Project Allocation

2,000,000

17(Base Project Allocation - $2,000,000)

 

18(29) Fulton County

 

19(i) (Reserved)

 

20(30) Greene County

 

21(i) Franklin Township

 

22(A) Acquisition, construction,
23infrastructure and other related costs
24for Greene County Airport commercial
25development project

 

26Project Allocation

2,500,000

27(Base Project Allocation - $2,500,000)

 

28(B) Acquisition, construction,
29infrastructure and other related costs
30for Waynesburg Crossings economic

 

1development project

 

2Project Allocation

2,000,000

3(Base Project Allocation - $2,000,000)

 

4(C) Acquisition, construction,
5infrastructure and other related costs
6for Franklin Township Business Park
7project

 

8Project Allocation

5,000,000

9(Base Project Allocation - $5,000,000)

 

10(31) Huntingdon County

 

11(i) Huntingdon County Business and Industry
12Incorporated

 

13(A) Acquisition, renovation, expansion
14and other improvements to Huntingdon
15County Career and Technology Center

 

16Project Allocation

2,500,000

17(Base Project Allocation - $2,500,000)

 

18(32) Indiana County

 

19(i) County projects

 

20(A) Acquisition, engineering, site
21preparation, infrastructure,
22construction and other related costs
23for development of vacant lots at
24Corporate Campus business park

 

25Project Allocation

1,000,000

26(Base Project Allocation - $1,000,000)

 

27(B) Acquisition, engineering, site
28preparation, infrastructure,
29construction and other related costs
30for development of multitenant

 

1building at Windy Ridge Business and
2Technology Park

 

3Project Allocation

1,000,000

4(Base Project Allocation - $1,000,000)

 

5(C) Acquisition, engineering, site
6preparation, infrastructure,
7construction and other related costs
8for development of industrial
9multitenant building known as
10Dixonville Commons

 

11Project Allocation

2,000,000

12(Base Project Allocation - $2,000,000)

 

13(D) Acquisition, engineering, site
14preparation, infrastructure,
15construction and other related costs
16for rehabilitation of Indiana
17Community Center Building

 

18Project Allocation

2,000,000

19(Base Project Allocation - $2,000,000)

 

20(E) Acquisition, engineering,
21infrastructure, construction and other
22related costs for development of
23countywide fiber optic network

 

24Project Allocation

2,000,000

25(Base Project Allocation - $2,000,000)

 

26(F) Acquisition, engineering, site
27preparation, infrastructure,
28construction and other related costs
29for development of multitenant
30building at 119 Business Park and

 

1Joseph Land development project

 

2Project Allocation

3,000,000

3(Base Project Allocation - $3,000,000)

 

4(G) Acquisition, engineering, site
5preparation, infrastructure,
6construction and other related costs
7for development of multipurpose
8building in White Township

 

9Project Allocation

3,000,000

10(Base Project Allocation - $3,000,000)

 

11(H) Acquisition, engineering, site
12preparation, infrastructure,
13construction and other related costs,
14including abatement of hazardous
15materials, for redevelopment of
16industrial building and conversion to
17multitenant building

 

18Project Allocation

3,000,000

19(Base Project Allocation - $3,000,000)

 

20(I) Acquisition, engineering, site
21preparation, infrastructure,
22construction and other related costs
23for development of vacant lots and
24acquisition of adjacent property at
25Windy Ridge Business and Technology
26Park

 

27Project Allocation

3,000,000

28(Base Project Allocation - $3,000,000)

 

29(J) Acquisition, engineering, site
30preparation, infrastructure,

 

1construction and other related costs
2for development of high bay,
3multitenant, industrial building at
4Windy Ridge Business and Technology
5Park

 

6Project Allocation

4,000,000

7(Base Project Allocation - $4,000,000)

 

8(33) Jefferson County

 

9(i) County projects

 

10(A) Acquisition, infrastructure,
11construction and other related costs
12for economic project

 

13Project Allocation

10,000,000

14(Base Project Allocation -
15$10,000,000)

 

16(ii) Brockway Borough

 

17(A) Acquisition, infrastructure,
18construction and other related costs
19for economic project to be located at
20intersection of Routes 219 and 28

 

21Project Allocation

10,000,000

22(Base Project Allocation -
23$10,000,000)

 

24(34) Juniata County

 

25(i) (Reserved)

 

26(35) Lackawanna County

 

27(i) County projects

 

28(A) Acquisition, construction,
29infrastructure and other related costs
30for Valley View Business Park

 

1Industrial Facility

 

2Project Allocation

5,000,000

3(Base Project Allocation - $5,000,000)

 

4(B) Acquisition, construction,
5renovations, infrastructure and other
6related costs for dental, medical,
7health sciences and patient care
8facilities project

 

9Project Allocation

20,000,000

10(Base Project Allocation -
11$20,000,000)

 

12(C) Acquisition, construction,
13renovations, infrastructure and other
14related costs for dental, medical,
15health sciences and patient care
16clinic

 

17Project Allocation

2,000,000

18(Base Project Allocation - $2,000,000)

 

19(ii) Archbald Borough

 

20(A) Construction, infrastructure and
21other costs related to Valley View
22Business Park redevelopment project

 

23Project Allocation

1,000,000

24(Base Project Allocation - $1,000,000)

 

25(B) Construction, infrastructure and
26other costs related for Archbald
27Business Park III redevelopment
28project

 

29Project Allocation

1,500,000

30(Base Project Allocation - $1,500,000)

 

1(C) Construction, infrastructure and
2other costs related to Valley View
3Business Park new building project

 

4Project Allocation

2,000,000

5(Base Project Allocation - $2,000,000)

 

6(D) Construction, infrastructure and
7other costs related to Archbald Route
86 Industrial Facility redevelopment
9project

 

10Project Allocation

2,000,000

11(Base Project Allocation - $2,000,000)

 

12(iii) Blakely Borough

 

13(A) Construction, infrastructure and
14other costs related to Blakely Borough
15Main Street Business District
16revitalization project

 

17Project Allocation

3,500,000

18(Base Project Allocation - $3,500,000)

 

19(iv) Carbondale Township

 

20(A) Construction, infrastructure and
21other costs related to Carbondale
22Technology Transfer Complex
23multitenant flex building project

 

24Project Allocation

361,000

25(Base Project Allocation - $361,000)

 

26(v) City of Carbondale

 

27(A) Acquisition, construction,
28infrastructure and other related costs
29for Carbondale Anchor Building
30redevelopment project

 

1Project Allocation

5,000,000

2(Base Project Allocation - $5,000,000)

 

3(vi) City of Scranton

 

4(A) Acquisition, construction,
5infrastructure and other related costs
6for Radisson Lackawanna Station
7restoration project

 

8Project Allocation

4,000,000

9(Base Project Allocation - $4,000,000)

 

10(B) Acquisition, construction,
11infrastructure and other related costs
12for Scranton Department of Public
13Works complex project

 

14Project Allocation

3,000,000

15(Base Project Allocation - $3,000,000)

 

16(C) Acquisition, construction,
17infrastructure and other related costs
18for Central Business District
19improvement project

 

20Project Allocation

2,000,000

21(Base Project Allocation - $2,000,000)

 

22(D) Acquisition, construction,
23infrastructure and other related costs
24for South Scranton Area Elm Street
25revitalization project

 

26Project Allocation

2,500,000

27(Base Project Allocation - $2,500,000)

 

28(E) Acquisition, construction,
29infrastructure and other related costs
30for Central Business District

 

1revitalization project

 

2Project Allocation

5,000,000

3(Base Project Allocation - $5,000,000)

 

4(F) Acquisition, construction,
5infrastructure and other related costs
6for Central District revitalization
7project

 

8Project Allocation

4,000,000

9(Base Project Allocation - $4,000,000)

 

10(G) Acquisition, construction,
11infrastructure and other related costs
12for new downtown office building

 

13Project Allocation

5,000,000

14(Base Project Allocation - $5,000,000)

 

15(H) Acquisition, construction,
16infrastructure and other related costs
17for Iron Arts District redevelopment
18project

 

19Project Allocation

5,000,000

20(Base Project Allocation - $5,000,000)

 

21(I) Acquisition, construction,
22infrastructure and other related costs
23for Iron Furnaces historic site
24project

 

25Project Allocation

10,000,000

26(Base Project Allocation -
27$10,000,000)

 

28(J) Acquisition, construction,
29infrastructure and other related costs
30for renovation of buildings in

 

1Downtown Business District for
2Lackawanna County Efficiency in
3Government project

 

4Project Allocation

3,000,000

5(Base Project Allocation - $3,000,000)

 

6(K) Construction, infrastructure and
7other costs related to Lackawanna
8County Park redevelopment and
9improvement projects

 

10Project Allocation

500,000

11(Base Project Allocation - $500,000)

 

12(L) Construction, infrastructure and
13other costs related to Lackawanna
14County Economic Development Initiative

 

15Project Allocation

2,500,000

16(Base Project Allocation - $2,500,000)

 

17(M) Acquisition, construction,
18infrastructure and other related costs
19for Lackawanna College Continuing
20Education expansion project

 

21Project Allocation

1,750,000

22(Base Project Allocation - $1,750,000)

 

23(N) Acquisition, construction,
24infrastructure and other related costs
25for Lackawanna College Learning
26Commons project

 

27Project Allocation

4,500,000

28(Base Project Allocation - $4,500,000)

 

29(O) Construction, infrastructure and
30other costs related to Lackawanna

 

1College street redevelopment project

 

2Project Allocation

1,500,000

3(Base Project Allocation - $1,500,000)

 

4(P) Construction, infrastructure and
5other costs related to Commonwealth
6Medical College redevelopment project

 

7Project Allocation

500,000

8(Base Project Allocation - $500,000)

 

9(Q) Construction, infrastructure,
10demolition and other costs related to
11Scranton Enterprise Center renovation
12project

 

13Project Allocation

1,000,000

14(Base Project Allocation - $1,000,000)

 

15(R) Construction, infrastructure and
16other costs related to former Murray
17Corporation Building redevelopment
18project

 

19Project Allocation

4,000,000

20(Base Project Allocation - $4,000,000)

 

21(S) Acquisition, construction,
22renovation, infrastructure and other
23related costs for Mt. Pleasant
24Corporate Center Office Building
25redevelopment project

 

26Project Allocation

3,000,000

27(Base Project Allocation - $3,000,000)

 

28(T) Construction and other related costs
29to rebuild facilities at Scranton's
30Farmer's Market and Albright Avenue

 

1Project Allocation

1,500,000

2(Base Project Allocation - $1,500,000)

 

3(U) Construction, infrastructure and
4other costs related to University of
5Scranton South Side Sports Complex
6project

 

7Project Allocation

7,500,000

8(Base Project Allocation - $7,500,000)

 

9(V) Construction, infrastructure and
10other costs related to University of
11Scranton rehabilitation project

 

12Project Allocation

20,000,000

13(Base Project Allocation -
14$20,000,000)

 

15(W) Construction, infrastructure and
16other costs related to expansion of
17Sette La Verghetta Center for the
18Performing Arts at Marywood University

 

19Project Allocation

3,000,000

20(Base Project Allocation - $3,000,000)

 

21(X) Construction, infrastructure and
22other costs related to clinical and
23community services at Marywood
24University's South Campus renovation
25project

 

26Project Allocation

3,000,000

27(Base Project Allocation - $3,000,000)

 

28(Y) Construction, infrastructure and
29other costs related to The Knowledge
30(Learning) Commons at Marywood

 

1University redevelopment project

 

2Project Allocation

12,500,000

3(Base Project Allocation -
4$12,500,000)

 

5(Z) Acquisition, construction,
6infrastructure and other costs related
7to Wright Primary Care Center
8development project

 

9Project Allocation

2,500,000

10(Base Project Allocation - $2,500,000)

 

11(AA) Acquisition, construction,
12infrastructure and other costs related
13to redevelopment of Lackawanna Avenue

 

14Project Allocation

10,000,000

15(Base Project Allocation -
16$10,000,000)

 

17(BB) Acquisition, construction,
18infrastructure and other costs related
19to compressed natural gas fueling
20station and maintenance facility

 

21Project Allocation

6,000,000

22(Base Project Allocation - $6,000,000)

 

23(CC) Acquisition, construction,
24infrastructure and other costs related
25to intermodal transportation center

 

26Project Allocation

1,000,000

27(Base Project Allocation - $1,000,000)

 

28(DD) Acquisition, construction,
29infrastructure and other costs related
30to Timmy's Town Center Children's

 

1Museum project

 

2Project Allocation

5,000,000

3(Base Project Allocation - $5,000,000)

 

4(EE) Acquisition, renovations,
5construction, infrastructure and other
6related costs for dental, medical,
7health sciences and patient care
8clinic

 

9Project Allocation

2,000,000

10(Base Project Allocation - $2,000,000)

 

11(vii) Dickson City

 

12(A) Acquisition, construction,
13infrastructure and other costs related
14to Dickson City Senior/Civic Center
15expansion project

 

16Project Allocation

2,500,000

17(Base Project Allocation - $2,500,000)

 

18(viii) Jefferson Township

 

19(A) Construction, infrastructure and
20other costs related to development of
21commercial site and to provide
22sanitary sewer infrastructure for
23project

 

24Project Allocation

1,000,000

25(Base Project Allocation - $1,000,000)

 

26(ix) Jessup Borough

 

27(A) Construction, infrastructure and
28other costs related to new building at
29Jessup Small Business Center

 

30Project Allocation

1,500,000

1(Base Project Allocation - $1,500,000)

 

2(B) Acquisition, construction,
3infrastructure and other costs related
4to Valley View Business Park
5Interchange project

 

6Project Allocation

8,000,000

7(Base Project Allocation - $8,000,000)

 

8(x) Laplume Township

 

9(A) Construction, infrastructure and
10other costs related to recreational
11facilities and housing projects for
12Keystone College

 

13Project Allocation

3,500,000

14(Base Project Allocation - $3,500,000)

 

15(xi) Mayfield Borough

 

16(A) Acquisition, construction,
17infrastructure and other costs related
18to Lackawanna Business Center
19redevelopment project

 

20Project Allocation

3,000,000

21(Base Project Allocation - $3,000,000)

 

22(xii) Moosic Borough

 

23(A) Construction, infrastructure
24improvements, and other costs related
25to former JC Penney building expansion
26project

 

27Project Allocation

2,000,000

28(Base Project Allocation - $2,000,000)

 

29(B) Acquisition, construction,
30infrastructure and other costs related

 

1to new building at Glenmaura Corporate
2Center

 

3Project Allocation

2,000,000

4(Base Project Allocation - $2,000,000)

 

5(C) Construction, infrastructure and
6other costs related to sanitary sewer
7infrastructure for industrial park

 

8Project Allocation

1,000,000

9(Base Project Allocation - $1,000,000)

 

10(xiii) Scott Township

 

11(A) Construction, infrastructure
12improvements and other costs related
13to Scott Township Technology and
14Industrial Facility redevelopment
15project

 

16Project Allocation

3,000,000

17(Base Project Allocation - $3,000,000)

 

18(xiv) Taylor Borough

 

19(A) Acquisition, construction,
20infrastructure and other costs related
21to Taylor redevelopment
22--Colliery/Feltsville project

 

23Project Allocation

5,000,000

24(Base Project Allocation - $5,000,000)

 

25(B) Acquisition, construction,
26infrastructure and other costs related
27to Taylor Borough industrial
28redevelopment project

 

29Project Allocation

5,000,000

30(Base Project Allocation - $5,000,000)

 

1(xv) West Mifflin Borough

 

2(A) Acquisition, construction,
3infrastructure and other costs related
4to development of aviation, industrial
5and commercial sites at or surrounding
6Allegheny County Airport

 

7Project Allocation

20,000,000

8(Base Project Allocation -
9$20,000,000)

 

10(36) Lancaster County

 

11(i) City of Lancaster

 

12(A) Acquisition, design, infrastructure,
13construction and other related costs
14for renovations to North Museum of
15Natural History and Science, including
16new roof, dome and SciDome touch
17projection, sound and software system

 

18Project Allocation

1,000,000

19(Base Project Allocation - $1,000,000)

 

20(B) Acquisition, design, infrastructure,
21construction and other related costs
22for mixed-use facility in center of
23city to be utilized by Millersville
24University, community services and
25shopping venues

 

26Project Allocation

5,000,000

27(Base Project Allocation - $5,000,000)

 

28(C) Acquisition, design, infrastructure,
29construction and other related costs
30for state-of-the-art medical education

 

1building for Lancaster General College
2of Nursing and Allied Sciences

 

3Project Allocation

22,000,000

4(Base Project Allocation -
5$22,000,000)

 

6(D) Infrastructure, construction and
7other related costs for design and
8construction of state-of-the-art
9facility to be utilized as wellness
10and medical center and aquatic
11competition and leisure facility

 

12Project Allocation

22,500,000

13(Base Project Allocation -
14$22,500,000)

 

15(ii) Lititz Economic Development Corporation

 

16(A) Acquisition, infrastructure,
17construction and other related costs
18for development and construction of
19Rock Lititz, a campus-style commercial
20park

 

21Project Allocation

7,000,000

22(Base Project Allocation - $7,000,000)

 

23(37) Lawrence County

 

24(i) (Reserved)

 

25(38) Lebanon County

 

26(i) County projects

 

27(A) Design, engineering, infrastructure
28improvements, construction and other
29related costs for redevelopment of
30Good Samaritan Hospital Cancer Care

 

1Center

 

2Project Allocation

5,000,000

3(Base Project Allocation - $5,000,000)

 

4(39) Lehigh County

 

5(i) Catasauqua Borough

 

6(A) Construction, infrastructure
7improvements and other costs related
8to the mixed-use Catasauqua
9redevelopment project

 

10Project Allocation

5,000,000

11(Base Project Allocation - $5,000,000)

 

12(ii) City of Allentown

 

13(A) Acquisition, abatement of hazardous
14materials, redevelopment and other
15related costs for construction of
16mixed-use facility adjacent to Sacred
17Heart Hospital

 

18Project Allocation

2,500,000

19(Base Project Allocation - $2,500,000)

 

20(B) Infrastructure, rehabilitation,
21construction and renovation of health
22center facilities

 

23Project Allocation

3,000,000

24(Base Project Allocation - $3,000,000)

 

25(C) Construction, renovation and other
26related costs for rehabilitation of
27Sacred Heart Hospital

 

28Project Allocation

5,000,000

29(Base Project Allocation - $5,000,000)

 

30(D) Acquisition, renovations, abatement

 

1of hazardous materials, construction
2and other related costs for
3rehabilitation of Civic Theatre of
4Allentown

 

5Project Allocation

3,500,000

6(Base Project Allocation - $3,500,000)

 

7(E) Land acquisition, infrastructure
8improvements, construction and other
9costs related to Little Lehigh Creek
10Industrial Corridor redevelopment
11project

 

12Project Allocation

2,000,000

13(Base Project Allocation - $2,000,000)

 

14(F) Infrastructure, renovations,
15construction and other related cost
16for Miller Symphony Hall's Lyric and
17Balcony rehabilitation projects

 

18Project Allocation

250,000

19(Base Project Allocation - $250,000)

 

20(G) Acquisition, renovations,
21construction and other related cost
22for DaVinci Discovery Center of
23Science and Technology

 

24Project Allocation

2,500,000

25(Base Project Allocation - $2,500,000)

 

26(iii) City of Bethlehem

 

27(A) Construction, infrastructure
28improvements and other costs related
29to Lehigh Valley Hospital renovation
30and expansion project

 

1Project Allocation

10,000,000

2(Base Project Allocation -
3$10,000,000)

 

4(iv) Fountain Hill Borough

 

5(A) Construction, infrastructure
6improvements and other costs related
7to St. Luke's Hospital Bethlehem
8Campus expansion project

 

9Project Allocation

5,000,000

10(Base Project Allocation - $5,000,000)

 

11(B) Construction, infrastructure
12improvements and other costs related
13to storm water retention system for
14flooding mitigation in Mill 2 complex

 

15Project Allocation

1,000,000

16(Base Project Allocation - $1,000,000)

 

17(40) Luzerne County

 

18(i) County projects

 

19(A) Acquisition, construction,
20infrastructure and other costs related
21to development of Lackawanna River
22Heritage Trail, lower section, along
23Lackawanna River

 

24Project Allocation

3,000,000

25(Base Project Allocation - $3,000,000)

 

26(ii) City of Nanticoke

 

27(A) Land acquisition, infrastructure
28improvements, site improvement,
29renovation, construction and other
30costs related to Greater Hazleton

 

1Health Alliance Health and Wellness
2Center

 

3Project Allocation

4,000,000

4(Base Project Allocation - $4,000,000)

 

5(iii) City of Pittston

 

6(A) Acquisition, construction,
7infrastructure and other costs related
8to Main & Market Professional Center
9project

 

10Project Allocation

2,500,000

11(Base Project Allocation - $2,500,000)

 

12(iv) City of Wilkes-Barre

 

13(A) Acquisition, construction,
14infrastructure and other costs related
15to redevelopment of Citizens Bank
16Center

 

17Project Allocation

5,000,000

18(Base Project Allocation - $5,000,000)

 

19(B) Construction, infrastructure
20improvements and other costs related
21to Wilkes University engineering
22school development project

 

23Project Allocation

5,000,000

24(Base Project Allocation - $5,000,000)

 

25(v) Dupont Borough

 

26(A) Acquisition, construction,
27infrastructure and other costs related
28to Wilkes-Barre/Scranton International
29Airport economic development project

 

30Project Allocation

2,000,000

1(Base Project Allocation - $2,000,000)

 

2(vi) Plains Township

 

3(A) Construction, infrastructure
4improvements and other costs related
5to Ultimate Sports facility project

 

6Project Allocation

6,000,000

7(Base Project Allocation - $6,000,000)

 

8(41) Lycoming County

 

9(i) County projects

 

10(A) Construction, rehabilitation and
11other related costs to serve NuWeld
12Corporation manufacturing facility

 

13Project Allocation

1,000,000

14(Base Project Allocation - $1,000,000)

 

15(B) Construction, demolition and other
16costs related to Williamsport Regional
17Airport terminal building project

 

18Project Allocation

3,000,000

19(Base Project Allocation - $3,000,000)

 

20(C) Design and construction of facility
21improvements, including directional
22signage, terminal building,
23renovations and parking at
24Williamsport Regional Airport

 

25Project Allocation

3,676,000

26(Base Project Allocation - $3,676,000)

 

27(D) Acquisition, rehabilitation,
28construction and other related costs
29for health care and housing facilities
30for Susquehanna Health System

 

1Project Allocation

20,000,000

2(Base Project Allocation -
3$20,000,000)

 

4(E) Acquisition, infrastructure,
5construction, redevelopment and other
6related costs for Susquehanna
7Community Health and Dental Center

 

8Project Allocation

10,000,000

9(Base Project Allocation -
10$10,000,000)

 

11(F) Acquisition, infrastructure,
12construction and other related costs
13for county forensic science center

 

14Project Allocation

2,000,000

15(Base Project Allocation - $2,000,000)

 

16(ii) Muncy Township

 

17(A) Acquisition, site preparation,
18infrastructure and construction for
19commercial and hotel development
20project to be constructed at Lycoming
21Mall Road and Lycoming Mall Drive

 

22Project Allocation

2,000,000

23(Base Project Allocation - $2,000,000)

 

24(42) McKean County

 

25(i) County projects

 

26(A) Acquisition, infrastructure,
27construction and other related costs
28for economic project

 

29Project Allocation

10,000,000

30(Base Project Allocation -

 

1$10,000,000)

 

2(ii) City of Bradford

 

3(A) Land acquisition, demolition, site
4clearance, building rehabilitation,
5building construction, site work,
6infrastructure, gateway and
7streetscape improvements, waterfront
8development, recreational projects,
9storm water management for flood
10control and other community
11improvements for economic development
12and community impact projects

 

13Project Allocation

10,000,000

14(Base Project Allocation -
15$10,000,000)

 

16(43) Mercer County

 

17(i) County projects

 

18(A) Infrastructure, construction and
19other related costs for WaterFire
20Sharon riverbank development

 

21Project Allocation

400,000

22(Base Project Allocation - $400,000)

 

23(B) Infrastructure and other related
24costs for construction of multitenant
25facility in Reynolds Industrial Park

 

26Project Allocation

1,000,000

27(Base Project Allocation - $1,000,000)

 

28(C) Acquisition, infrastructure,
29construction and other related costs,
30including abatement of hazardous

 

1materials, for rehabilitation of
2Damascuc-Bishop Tube facility

 

3Project Allocation

1,500,000

4(Base Project Allocation - $1,500,000)

 

5(D) Acquisition, rehabilitation,
6construction and other related costs
7for development of Penn-Ohio Center
8for Arts & Technology

 

9Project Allocation

2,225,000

10(Base Project Allocation - $2,225,000)

 

11(ii) Greenville Area Economic Development
12Corporation

 

13(A) Acquisition, rehabilitation,
14construction and other related costs
15for redevelopment of Greenville
16Trinity Industries property

 

17Project Allocation

3,000,000

18(Base Project Allocation - $3,000,000)

 

19(B) Renovation and rehabilitation of
20historical building to transform it
21into training facility for Greenville
22Neuromodulation Clinic

 

23Project Allocation

1,000,000

24(Base Project Allocation - $1,000,000)

 

25(iii) City of Hermitage

 

26(A) Acquisition, construction, renovation
27and infrastructure improvements to
28industrial facility

 

29Project Allocation

2,000,000

30(Base Project Allocation - $2,000,000)

 

1(B) Acquisition, construction and
2infrastructure improvements for
3business park project

 

4Project Allocation

3,000,000

5(Base Project Allocation - $3,000,000)

 

6(44) Mifflin County

 

7(i) Mifflin County Industrial Development
8Authority

 

9(A) Acquisition, construction,
10rehabilitation and other costs related
11to design and construction of
12facilities to be utilized as branch
13campus of Pennsylvania Highlands
14Community College

 

15Project Allocation

600,000

16(Base Project Allocation - $600,000)

 

17(B) Acquisition, construction and other
18related costs for extension of public
19infrastructure within Mifflin County
20Industrial Park

 

21Project Allocation

1,000,000

22(Base Project Allocation - $1,000,000)

 

23(C) Demolition, remediation, renovations
24and infrastructure improvements to
25Mifflin County Industrial Development
26Corporation Plaza, a brownfield site
27located in Granville Township

 

28Project Allocation

1,250,000

29(Base Project Allocation - $1,250,000)

 

30(D) Construction, renovation,

 

1rehabilitation and other related costs
2for redevelopment and improvements for
3Mifflin County senior citizen housing
4units

 

5Project Allocation

3,000,000

6(Base Project Allocation - $3,000,000)

 

7(45) Monroe County

 

8(i) Barrett Township

 

9(A) Construction, infrastructure
10improvements and other costs related
11to Skytop restoration project

 

12Project Allocation

1,000,000

13(Base Project Allocation - $1,000,000)

 

14(ii) Bartonsville

 

15(A) Land acquisition, construction,
16infrastructure and other related costs
17for St. Luke's University Health
18Network development project

 

19Project Allocation

20,000,000

20(Base Project Allocation -
21$20,000,000)

 

22(46) Montgomery County

 

23(i) County projects

 

24(A) Acquisition, infrastructure,
25construction and other related costs
26for renovation and expansion of
27Rosemont College's Cardinal Hall

 

28Project Allocation

2,500,000

29(Base Project Allocation - $2,500,000)

 

30(ii) Redevelopment Authority of the County of

 

1Montgomery

 

2(A) Acquisition, infrastructure,
3construction, renovation and
4redevelopment of mill building located
5at Beech and Evans Streets in Borough
6of Pottstown

 

7Project Allocation

1,000,000

8(Base Project Allocation - $1,000,000)

 

9(B) Acquisition, infrastructure,
10construction, renovation and
11redevelopment of Empire Firehouse
12located at Franklin and Chestnut
13Streets in Borough of Pottstown

 

14Project Allocation

1,000,000

15(Base Project Allocation - $1,000,000)

 

16(C) Acquisition, infrastructure,
17construction and development of health
18complex on campus of Pottstown
19Memorial Medical Center in Borough of
20Pottstown

 

21Project Allocation

3,000,000

22(Base Project Allocation - $3,000,000)

 

23(D) Site preparation, infrastructure,
24construction and other related costs
25for construction and development of
26mixed-use commercial center at the
27intersection of Route 100 and Market
28Street in Douglas Township

 

29Project Allocation

4,000,000

30(Base Project Allocation - $4,000,000)

 

1(iii) Cheltenham Township

 

2(A) Construction, infrastructure
3improvements, including rehabilitation
4of sanitary sewer system, and other
5related costs for business development

 

6Project Allocation

6,000,000

7(Base Project Allocation - $6,000,000)

 

8(B) Construction, infrastructure
9improvements and other costs related
10to pedestrian signals and crossings

 

11Project Allocation

1,750,000

12(Base Project Allocation - $1,750,000)

 

13(C) Construction, infrastructure
14improvements and other costs related
15to Elkins Park West streetscape and
16transportation enhancement project

 

17Project Allocation

3,000,000

18(Base Project Allocation - $3,000,000)

 

19(D) Acquisition, infrastructure,
20construction and other related costs
21for relocation of Public Works
22facility

 

23Project Allocation

7,500,000

24(Base Project Allocation - $7,500,000)

 

25(iv) Conshohocken Borough

 

26(A) Construction, infrastructure
27improvements and other costs related
28to Verizon Building remediation and
29adaptive reuse project

 

30Project Allocation

4,391,000

1(Base Project Allocation - $4,391,000)

 

2(B) Construction, infrastructure
3improvements and other costs related
4to Seven Tower Bridge development
5project

 

6Project Allocation

5,000,000

7(Base Project Allocation - $5,000,000)

 

8(v) East Norriton Township

 

9(A) Construction, infrastructure
10improvements and other costs related
11to renovation of patient rooms

 

12Project Allocation

2,000,000

13(Base Project Allocation - $2,000,000)

 

14(vi) Lower Gwynedd Township

 

15(A) Acquisition, infrastructure,
16construction and other related costs
17for Phase III of Bethlehem Pike
18revitalization project, including
19streetscape and safety improvements

 

20Project Allocation

500,000

21(Base Project Allocation - $500,000)

 

22(vii) Lower Merion Township

 

23(A) Construction, infrastructure
24improvements and other costs related
25to expansion of Ardmore Train Station
26transit and parking improvements
27project

 

28Project Allocation

10,000,000

29(Base Project Allocation -
30$10,000,000)

 

1(B) Construction, infrastructure
2improvements and other costs related
3to Rosemont College building
4renovations

 

5Project Allocation

5,000,000

6(Base Project Allocation - $5,000,000)

 

7(viii) Lower Providence Township

 

8(A) Infrastructure, construction and
9other related costs, including
10abatement of hazardous materials, for
11redevelopment of Rittenhouse Road CSG
12Superfund site located in Park Pointe
13at Lower Providence Business Park

 

14Project Allocation

2,500,000

15(Base Project Allocation - $2,500,000)

 

16(ix) Montgomery Township

 

17(A) Infrastructure, redevelopment and
18construction of multipurpose
19recreational community center

 

20Project Allocation

5,000,000

21(Base Project Allocation - $5,000,000)

 

22(x) Norristown Borough

 

23(A) Construction, infrastructure
24improvements and other costs related
25to new mixed-income development in
26downtown Norristown

 

27Project Allocation

1,500,000

28(Base Project Allocation - $1,500,000)

 

29(xi) Springfield Township

 

30(A) Construction, infrastructure

 

1improvements and other costs related
2to Wordsworth Academy Fort Washington
3project

 

4Project Allocation

2,500,000

5(Base Project Allocation - $2,500,000)

 

6(xii) Upper Dublin Township

 

7(A) Acquisition, renovation,
8infrastructure development, site
9preparation and construction to
10support redevelopment and
11revitalization of Fort Washington
12Office Park

 

13Project Allocation

10,000,000

14(Base Project Allocation -
15$10,000,000)

 

16(xiii) Upper Merion Township

 

17(A) Construction, infrastructure
18improvements and other costs related
19to DeKalb/Gulph redevelopment project

 

20Project Allocation

3,000,000

21(Base Project Allocation - $3,000,000)

 

22(xiv) Upper Moreland Township

 

23(A) Construction, infrastructure
24improvements and other related costs
25for Willow Grove Industrial Commons,
26including construction of regional
27storm water management basin to
28improve economic development of the
29area

 

30Project Allocation

500,000

1(Base Project Allocation - $500,000)

 

2(xv) Whitemarsh Township

 

3(A) Construction, infrastructure
4improvements and other costs related
5to AIM Institute for Learning and
6Research redevelopment and expansion
7project

 

8Project Allocation

3,500,000

9(Base Project Allocation - $3,500,000)

 

10(47) Montour County

 

11(i) (Reserved)

 

12(48) Northampton County

 

13(i) County projects

 

14(A) Acquisition, construction,
15infrastructure and other costs related
16to community-based outpatient health
17services facility

 

18Project Allocation

8,000,000

19(Base Project Allocation - $8,000,000)

 

20(B) Acquisition, construction,
21infrastructure and other costs related
22to renovation of mixed-use buildings
23in urban areas

 

24Project Allocation

2,000,000

25(Base Project Allocation - $2,000,000)

 

26(C) Acquisition, construction,
27infrastructure and other costs related
28to warehouse facility project

 

29Project Allocation

5,000,000

30(Base Project Allocation - $5,000,000)

 

1(ii) Bethlehem Township

 

2(A) Construction, renovation and other
3related costs to expand and further
4develop St. Luke's Hospital Anderson
5Campus

 

6Project Allocation

20,000,000

7(Base Project Allocation -
8$20,000,000)

 

9(B) Site development and infrastructure
10improvements for Highland Avenue and
11Mowrer Drive industrial sites

 

12Project Allocation

500,000

13(Base Project Allocation - $500,000)

 

14(iii) City of Bethlehem

 

15(A) Construction, renovation,
16infrastructure and other related costs
17to ArtsQuest renovation project

 

18Project Allocation

1,000,000

19(Base Project Allocation - $1,000,000)

 

20(iv) City of Easton

 

21(A) Acquisition, construction,
22infrastructure and other costs related
23to High School Sports Hall of Fame
24museum

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(B) Acquisition, construction,
28infrastructure and other costs related
29to redevelopment of mixed-use
30building, including structured parking

 

1on Ferry Street

 

2Project Allocation

3,000,000

3(Base Project Allocation - $3,000,000)

 

4(C) Acquisition, construction,
5infrastructure and other costs related
6to redevelopment of mixed-use
7buildings, including parking and park
8infrastructure improvements to Centre
9Square

 

10Project Allocation

10,000,000

11(Base Project Allocation -
12$10,000,000)

 

13(D) Construction, infrastructure and
14other costs related to redevelopment
15of mixed-use commercial/office
16building with integrated parking and
17residential upper floor

 

18Project Allocation

1,156,000

19(Base Project Allocation - $1,156,000)

 

20(E) Acquisition, construction,
21infrastructure and other costs related
22to Marquis Commons project

 

23Project Allocation

2,000,000

24(Base Project Allocation - $2,000,000)

 

25(v) East Allen Township

 

26(A) Infrastructure and related site costs
27for Shoppes at Route 512 and East
28Allen Marketplace renovation project

 

29Project Allocation

600,000

30(Base Project Allocation - $600,000)

 

1(vi) East Bangor Borough

 

2(A) Construction, infrastructure and
3other costs related to development of
4government center, heritage center and
5community disaster center

 

6Project Allocation

150,000

7(Base Project Allocation - $150,000)

 

8(vii) Hellertown Borough

 

9(A) Acquisition, construction,
10infrastructure and other costs related
11to rehabilitation of former Champion
12Spark Plug facility

 

13Project Allocation

2,500,000

14(Base Project Allocation - $2,500,000)

 

15(viii) Lower Nazareth

 

16(A) Acquisition, construction,
17infrastructure and other costs related
18to industrial park in Nazareth area

 

19Project Allocation

10,000,000

20(Base Project Allocation -
21$10,000,000)

 

22(ix) Portland Borough

 

23(A) Acquisition of land and construction
24of office building in Portland
25Industrial Park

 

26Project Allocation

4,500,000

27(Base Project Allocation - $4,500,000)

 

28(x) Upper Mt. Bethel Township

 

29(A) Acquisition, construction,
30infrastructure and other costs related

 

1to industrial park project

 

2Project Allocation

10,000,000

3(Base Project Allocation -
4$10,000,000)

 

5(B) Acquisition of land and construction
6of office building in Portland
7Industrial Park

 

8Project Allocation

4,500,000

9(Base Project Allocation - $4,500,000)

 

10(49) Northumberland County

 

11(i) County projects

 

12(A) Redevelopment and other costs related
13to construction of state-of-the-art
14carbon processing facility located at
15Shamokin Carbons

 

16Project Allocation

4,000,000

17(Base Project Allocation - $4,000,000)

 

18(50) Perry County

 

19(i) (Reserved)

 

20(51) Philadelphia County

 

21(i) County projects

 

22(A) Renovation of biology labs and
23associated prep rooms at Community
24College of Philadelphia's main campus
25and West Regional Center

 

26Project Allocation

2,000,000

27(Base Project Allocation - $2,000,000)

 

28(ii) City of Philadelphia

 

29(A) Construction, infrastructure,
30rehabilitation improvements and other

 

1costs related to Moore College of Art
2& Design project

 

3Project Allocation

4,000,000

4(Base Project Allocation - $4,000,000)

 

5(B) Construction and other related costs
6for Cascia Center of the National
7Shrine of Saint Rita project

 

8Project Allocation

1,000,000

9(Base Project Allocation - $1,000,000)

 

10(C) Construction, infrastructure and
11other costs related to Hotel Indigo
12project

 

13Project Allocation

35,000,000

14(Base Project Allocation -
15$35,000,000)

 

16(D) Construction, infrastructure and
17other costs related to Reading Viaduct
18project

 

19Project Allocation

3,500,000

20(Base Project Allocation - $3,500,000)

 

21(E) Construction, infrastructure and
22other costs related to Penn Treaty
23Village project

 

24Project Allocation

55,000,000

25(Base Project Allocation -
26$55,000,000)

 

27(F) For building, gallery, exhibit and
28site restoration, renovation,
29construction, infrastructure and
30technology upgrades at Franklin

 

1Institute

 

2Project Allocation

25,000,000

3(Base Project Allocation -
4$25,000,000)

 

5(G) Construction, infrastructure and
6other related costs for Russell Byers
7Charter School expansion project

 

8Project Allocation

3,125,000

9(Base Project Allocation - $3,125,000)

 

10(H) Construction, infrastructure and
11other costs related to Live Arts
12Festival and Philly Fringe Arts Center
13project

 

14Project Allocation

500,000

15(Base Project Allocation - $500,000)

 

16(I) Construction, infrastructure and
17other costs related to Convention
18Center Hotel mixed-use project

 

19Project Allocation

30,000,000

20(Base Project Allocation -
21$30,000,000)

 

22(J) Construction, infrastructure and
23other costs related to Proto Brewery
24Hotel project

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(K) Construction, infrastructure and
28other costs related to Stables
29redevelopment project

 

30Project Allocation

3,000,000

1(Base Project Allocation - $3,000,000)

 

2(L) Construction, infrastructure and
3other costs related to Tulip Street
4redevelopment project

 

5Project Allocation

500,000

6(Base Project Allocation - $500,000)

 

7(M) Construction, infrastructure and
8other costs related to Columbia Street
9redevelopment project

 

10Project Allocation

1,000,000

11(Base Project Allocation - $1,000,000)

 

12(N) Acquisition, construction,
13infrastructure and other costs related
14to 1010 Avenue of the Arts New
15Headquarters Campus Civic Culture Hub
16project

 

17Project Allocation

8,000,000

18(Base Project Allocation - $8,000,000)

 

19(O) Construction, infrastructure and
20other costs related to Pro-Square
21Kingsessing Nursing Home project

 

22Project Allocation

7,500,000

23(Base Project Allocation - $7,500,000)

 

24(P) Redevelopment, construction,
25infrastructure and other costs related
26to Jasper Street Manufacturing
27Facility project

 

28Project Allocation

1,250,000

29(Base Project Allocation - $1,250,000)

 

30(Q) Redevelopment, construction,

 

1infrastructure and other costs related
2to AC Linen Laundry commercial project

 

3Project Allocation

5,000,000

4(Base Project Allocation - $5,000,000)

 

5(R) Redevelopment, construction,
6infrastructure and other costs related
7to Convention Center Hotel project at
815th and Race Streets

 

9Project Allocation

30,000,000

10(Base Project Allocation -
11$30,000,000)

 

12(S) Facilities construction,
13infrastructure, storm water management
14and restoration of tidal wetland for
15Penn Treaty Park Phase I project

 

16Project Allocation

10,000,000

17(Base Project Allocation -
18$10,000,000)

 

19(T) Facilities construction,
20infrastructure, renovations and other
21costs related to Franklin Delano
22Roosevelt Park

 

23Project Allocation

10,000,000

24(Base Project Allocation -
25$10,000,000)

 

26(U) Construction, infrastructure and
27other costs related to Salvation Army
28Eliza Shirley Campus project

 

29Project Allocation

1,750,000

30(Base Project Allocation - $1,750,000)

 

1(V) Acquisition, construction,
2infrastructure and other costs related
3to KIPP Philadelphia School project

 

4Project Allocation

3,500,000

5(Base Project Allocation - $3,500,000)

 

6(W) Construction, infrastructure and
7other costs related to East Falls
8streetscape project

 

9Project Allocation

2,500,000

10(Base Project Allocation - $2,500,000)

 

11(X) Construction, infrastructure and
12other costs related to Eastern
13Pennsylvania Psychiatric Institute
14redevelopment project

 

15Project Allocation

5,000,000

16(Base Project Allocation - $5,000,000)

 

17(Y) Construction, demolition,
18acquisition, infrastructure,
19redevelopment and other related costs
20for campus improvements and facilities
21expansion at Philadelphia University

 

22Project Allocation

20,000,000

23(Base Project Allocation -
24$20,000,000)

 

25(Z) Acquisition, construction,
26infrastructure and other costs related
27to Women's Domestic Violence Shelter
28residential and commercial facility
29project

 

30Project Allocation

5,000,000

1(Base Project Allocation - $5,000,000)

 

2(AA) Acquisition, construction,
3infrastructure and other costs related
4to Free Library of Philadelphia George
5Institute renovation and building
6project

 

7Project Allocation

3,000,000

8(Base Project Allocation - $3,000,000)

 

9(BB) Construction, infrastructure and
10other costs related to University City
11Science Center build-out project

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

14(CC) Construction, infrastructure,
15renovations and other costs for Please
16Touch Museum restoration project

 

17Project Allocation

1,500,000

18(Base Project Allocation - $1,500,000)

 

19(DD) Acquisition, clearing, demolition,
20renovation, environmental remediation,
21construction, infrastructure, design,
22streets, utilities and other costs
23associated with development of
24Innovation Neighborhood by Drexel
25University

 

26Project Allocation

30,000,000

27(Base Project Allocation -
28$30,000,000)

 

29(EE) Construction, infrastructure,
30renovations and other costs for

 

1Gaudenzia Foundation Family Center

 

2Project Allocation

4,500,000

3(Base Project Allocation - $4,500,000)

 

4(FF) Construction, infrastructure,
5renovations and other costs for North
6Philadelphia Health System St.
7Joseph's Hospital & Girard Medical
8Center

 

9Project Allocation

7,500,000

10(Base Project Allocation - $7,500,000)

 

11(GG) Infrastructure improvements,
12including electrical and technology
13upgrades for Holy Family University

 

14Project Allocation

1,000,000

15(Base Project Allocation - $1,000,000)

 

16(HH) Construction, infrastructure,
17renovations and other costs for Holy
18Family University Marian Hall project

 

19Project Allocation

5,000,000

20(Base Project Allocation - $5,000,000)

 

21(II) Construction, infrastructure,
22renovations and other costs for
23revitalization of former Frankford
24Arsenal as Shopping Center at the
25ARSENAL

 

26Project Allocation

2,500,000

27(Base Project Allocation - $2,500,000)

 

28(JJ) Construction, infrastructure and
29other costs related to plant upgrades
30at S. D. Richman Sons, Inc., facility

 

1for automobile shredder project in
2Port Richmond

 

3Project Allocation

5,000,000

4(Base Project Allocation - $5,000,000)

 

5(KK) Construction, infrastructure,
6renovations and other costs for Fox
7Chase Cancer Center Comparative
8Medical Research Facility

 

9Project Allocation

8,000,000

10(Base Project Allocation - $8,000,000)

 

11(LL) Construction, infrastructure and
12other costs related to Fox Chase
13Cancer Center physicians office
14building project

 

15Project Allocation

8,000,000

16(Base Project Allocation - $8,000,000)

 

17(MM) Construction, infrastructure and
18other costs related to Fox Chase
19Cancer Center Outpatient Chemotherapy
20Infusion Center

 

21Project Allocation

3,000,000

22(Base Project Allocation - $3,000,000)

 

23(NN) Construction, infrastructure,
24renovations and other costs for Fox
25Chase Cancer Center Laboratory
26Research and shared resource
27facilities

 

28Project Allocation

7,000,000

29(Base Project Allocation - $7,000,000)

 

30(OO) Construction, infrastructure,

 

1renovations and other costs for Fox
2Chase Cancer Center Conference Center

 

3Project Allocation

1,500,000

4(Base Project Allocation - $1,500,000)

 

5(PP) Construction, infrastructure,
6renovations and other costs for Fox
7Chase Cancer Center central utility
8plant upgrades

 

9Project Allocation

4,000,000

10(Base Project Allocation - $4,000,000)

 

11(QQ) Demolition, acquisition,
12construction, infrastructure and other
13costs for Liddonfield revitalization,
14renovation and rehabilitation project

 

15Project Allocation

35,000,000

16(Base Project Allocation -
17$35,000,000)

 

18(RR) Construction, infrastructure,
19renovations and other costs for
20Independence Visitor Center service
21desk improvement project

 

22Project Allocation

500,000

23(Base Project Allocation - $500,000)

 

24(SS) Acquisition, construction,
25infrastructure improvements and other
26costs related to Parkwood Therapeutic
27Riding Center expansion and
28revitalization project

 

29Project Allocation

1,500,000

30(Base Project Allocation - $1,500,000)

 

1(TT) Acquisition, construction,
2infrastructure improvements and other
3costs related to Bustleton Bengals
4Gymnasium

 

5Project Allocation

750,000

6(Base Project Allocation - $750,000)

 

7(UU) Acquisition, construction,
8infrastructure improvements and other
9costs related to manufacturing
10facility near intersection of Comly
11Road and Roosevelt Boulevard in
12Northeast Philadelphia

 

13Project Allocation

2,500,000

14(Base Project Allocation - $2,500,000)

 

15(VV) Construction, infrastructure and
16other costs related to Methodist Home
17for Children incubator/shared kitchen
18program

 

19Project Allocation

500,000

20(Base Project Allocation - $500,000)

 

21(WW) Construction, infrastructure and
22other costs related to West 59th and
23Market Streets mixed-use, transit-
24oriented development project

 

25Project Allocation

2,000,000

26(Base Project Allocation - $2,000,000)

 

27(XX) Acquisition, construction,
28infrastructure, redevelopment and
29other costs related to Green Tree
30School development project

 

1Project Allocation

1,000,000

2(Base Project Allocation - $1,000,000)

 

3(YY) Construction, infrastructure and
4other costs related to Schuylkill
5Crossing at Grays Ferry redevelopment
6project

 

7Project Allocation

6,000,000

8(Base Project Allocation - $6,000,000)

 

9(ZZ) Construction, infrastructure and
10other costs related to Wistar
11Institute administrative operations
12space retrofit project

 

13Project Allocation

1,500,000

14(Base Project Allocation - $1,500,000)

 

15(AAA) Construction, infrastructure and
16other costs related to Wistar
17Institute class A laboratory
18conversion project

 

19Project Allocation

1,600,000

20(Base Project Allocation - $1,600,000)

 

21(BBB) Construction, infrastructure and
22other costs related to Boys' Latin of
23Philadelphia Charter School Middle
24School building project

 

25Project Allocation

700,000

26(Base Project Allocation - $700,000)

 

27(CCC) Acquisition, infrastructure,
28construction, redevelopment and other
29related costs for Greater Philadelphia
30Health Action

 

1Project Allocation

10,000,000

2(Base Project Allocation -
3$10,000,000)

 

4(DDD) Acquisition, infrastructure,
5construction, redevelopment and other
6related costs for Wynnefield
7Multipurpose Center

 

8Project Allocation

1,500,000

9(Base Project Allocation - $1,500,000)

 

10(EEE) Construction, infrastructure and
11other costs related to medical
12education center at University of
13Pennsylvania Perelman School of
14Medicine

 

15Project Allocation

15,000,000

16(Base Project Allocation -
17$15,000,000)

 

18(FFF) Construction, infrastructure and
19other costs related to University of
20Pennsylvania's Walnut Street Gateway
21streetscape project

 

22Project Allocation

1,500,000

23(Base Project Allocation - $1,500,000)

 

24(GGG) Construction, infrastructure and
25other costs related to Wynne Ballroom
26redevelopment mixed-use facility
27project

 

28Project Allocation

200,000

29(Base Project Allocation - $200,000)

 

30(HHH) Construction, infrastructure and

 

1other costs related to Magee
2Rehabilitation Hospital improvement
3project

 

4Project Allocation

500,000

5(Base Project Allocation - $500,000)

 

6(III) Construction, infrastructure and
7other costs related to El Centro de
8Oro Market project

 

9Project Allocation

750,000

10(Base Project Allocation - $750,000)

 

11(JJJ) Acquisition, infrastructure,
12construction, redevelopment and other
13related costs for Nueva Esperanza
14North 5th Street redevelopment

 

15Project Allocation

3,000,000

16(Base Project Allocation - $3,000,000)

 

17(KKK) Acquisition, infrastructure,
18demolition, construction,
19redevelopment and other related costs
20for Nueva Esperanza commercial/retail
21business redevelopment project

 

22Project Allocation

3,000,000

23(Base Project Allocation - $3,000,000)

 

24(LLL) Construction, infrastructure and
25other costs related to revitalization
26of 1711 West Allegheny Avenue

 

27Project Allocation

500,000

28(Base Project Allocation - $500,000)

 

29(MMM) Acquisition, infrastructure,
30demolition, construction,

 

1redevelopment and other related costs
2for Plaza Allegheny mixed-use
3commercial retail shopping center in
4Fairhill

 

5Project Allocation

4,000,000

6(Base Project Allocation - $4,000,000)

 

7(NNN) Construction, infrastructure and
8other development costs for emergency,
9inpatient, outpatient and clinical
10facilities for Temple University
11Hospital

 

12Project Allocation

10,000,000

13(Base Project Allocation -
14$10,000,000)

 

15(OOO) Construction, infrastructure and
16other costs related to University of
17Pennsylvania South Bank commercial
18office and research park redevelopment
19project

 

20Project Allocation

2,300,000

21(Base Project Allocation - $2,300,000)

 

22(PPP) Construction, infrastructure and
23other costs related to renovation and
24improvement of North City Congress
25Senior Community Center

 

26Project Allocation

1,000,000

27(Base Project Allocation - $1,000,000)

 

28(QQQ) Acquisition, construction,
29infrastructure and other costs related
30to North City Congress Community

 

1Center facility project

 

2Project Allocation

3,000,000

3(Base Project Allocation - $3,000,000)

 

4(RRR) Construction, infrastructure and
5other costs related to Smith Memorial
6Playhouse Restoration IV and Gateway
7Project

 

8Project Allocation

5,000,000

9(Base Project Allocation - $5,000,000)

 

10(SSS) Acquisition, construction,
11infrastructure and other costs related
12to Chariot Landing-International Row
13mixed-use revitalization project

 

14Project Allocation

40,000,000

15(Base Project Allocation -
16$40,000,000)

 

17(TTT) Acquisition, construction,
18infrastructure and development of
19mixed-use Civil Justice Center campus,
20including commercial office space for
21leading legal service organizations

 

22Project Allocation

6,000,000

23(Base Project Allocation - $6,000,000)

 

24(UUU) Acquisition, construction,
25infrastructure, redevelopment and
26other related costs for facilities to
27deliver medical services, conduct
28research or provide other related
29activities for Magee Rehabilitation
30Hospital

 

1Project Allocation

15,000,000

2(Base Project Allocation -
3$15,000,000)

 

4(VVV) Construction, infrastructure and
5other costs related to FDR Park
6Boathouse Cescaphe Ballroom adaptive
7reuse project

 

8Project Allocation

750,000

9(Base Project Allocation - $750,000)

 

10(WWW) Construction, infrastructure and
11other costs related to Old City
12District streetscape improvement
13project

 

14Project Allocation

500,000

15(Base Project Allocation - $500,000)

 

16(XXX) Acquisition, construction,
17infrastructure, redevelopment and
18other related costs for 1010 Avenue of
19the Arts New Headquarters Campus/Civic
20Culture Hub

 

21Project Allocation

8,000,000

22(Base Project Allocation - $8,000,000)

 

23(YYY) Construction, infrastructure and
24other costs related to WHYY facilities
25upgrade project

 

26Project Allocation

500,000

27(Base Project Allocation - $500,000)

 

28(ZZZ) Acquisition, construction,
29infrastructure, redevelopment and
30other related costs for Friends Select

 

1School renovation project

 

2Project Allocation

2,000,000

3(Base Project Allocation - $2,000,000)

 

4(AAAA) Construction, site preparation,
5expansion and infrastructure-related
6costs and construction of Chestnut
7Hill College campus academic center
8facility

 

9Project Allocation

10,000,000

10(Base Project Allocation -
11$10,000,000)

 

12(BBBB) Construction, infrastructure,
13renovations and other costs for
14National Constitution Center

 

15Project Allocation

30,000,000

16(Base Project Allocation -
17$30,000,000)

 

18(CCCC) Construction, infrastructure,
19renovations and other costs for museum
20administration building at Eastern
21State Penitentiary Historic Site

 

22Project Allocation

6,500,000

23(Base Project Allocation - $6,500,000)

 

24(DDDD) Construction, infrastructure,
25renovations and other costs for
26interior and exterior improvements at
27Eastern State Penitentiary Historic
28Site

 

29Project Allocation

3,100,000

30(Base Project Allocation - $3,100,000)

 

1(EEEE) Acquisition, construction,
2infrastructure, redevelopment and
3other related costs for 900 North
4Broad Street project

 

5Project Allocation

4,500,000

6(Base Project Allocation - $4,500,000)

 

7(FFFF) Acquisition, construction,
8infrastructure and other related costs
9for Divine Lorraine property
10redevelopment project

 

11Project Allocation

7,500,000

12(Base Project Allocation - $7,500,000)

 

13(GGGG) Acquisition, construction,
14infrastructure and other related costs
15for redevelopment of Stutz property at
16666-667 North Broad Street, 1360-64
17Ridge Avenue and 1319 Wallace Street

 

18Project Allocation

5,000,000

19(Base Project Allocation - $5,000,000)

 

20(HHHH) Acquisition, construction,
21infrastructure and other related costs
22for redevelopment of Stevens property
23at 523 North Broad Street

 

24Project Allocation

6,000,000

25(Base Project Allocation - $6,000,000)

 

26(IIII) Acquisition, construction,
27infrastructure and other related costs
28for redevelopment of Metropolitan
29Opera House

 

30Project Allocation

3,000,000

1(Base Project Allocation - $3,000,000)

 

2(JJJJ) Acquisition, construction,
3infrastructure and other related costs
4for redevelopment of Benjamin Franklin
5High School property

 

6Project Allocation

12,000,000

7(Base Project Allocation -
8$12,000,000)

 

9(KKKK) Acquisition, construction,
10infrastructure and other related costs
11for redevelopment of Parkway Center
12City High School property

 

13Project Allocation

6,000,000

14(Base Project Allocation - $6,000,000)

 

15(LLLL) Acquisition, construction,
16infrastructure and other related costs
17for redevelopment of Julia R.
18Masterman High School property

 

19Project Allocation

8,000,000

20(Base Project Allocation - $8,000,000)

 

21(MMMM) Acquisition, construction,
22infrastructure and other related costs
23for redevelopment of Franklin Learning
24Center property at 616 North 15th
25Street

 

26Project Allocation

7,500,000

27(Base Project Allocation - $7,500,000)

 

28(NNNN) Acquisition, construction,
29infrastructure and other related costs
30for redevelopment of William Penn High

 

1School property at 1333 North Broad
2Street

 

3Project Allocation

20,000,000

4(Base Project Allocation -
5$20,000,000)

 

6(OOOO) Acquisition, construction,
7infrastructure and other related costs
8for redevelopment of North Broad
9Street Salvation Army property at 701
10North Broad Street

 

11Project Allocation

10,000,000

12(Base Project Allocation -
13$10,000,000)

 

14(PPPP) Acquisition, construction,
15infrastructure, redevelopment and
16other costs related to Greene Street
17Friends School expansion project

 

18Project Allocation

2,000,000

19(Base Project Allocation - $2,000,000)

 

20(QQQQ) Construction, infrastructure and
21other costs related to the renovation
22of SHARE Food Program facility

 

23Project Allocation

2,000,000

24(Base Project Allocation - $2,000,000)

 

25(RRRR) Construction, infrastructure and
26other costs related to the SoKo site
27in Old Kensington/Northern Liberties
28neighborhood

 

29Project Allocation

4,500,000

30(Base Project Allocation - $4,500,000)

 

1(SSSS) Acquisition, infrastructure,
2construction and other related costs
3for 30 University Place project

 

4Project Allocation

6,500,000

5(Base Project Allocation - $6,500,000)

 

6(TTTT) Acquisition, infrastructure,
7construction, redevelopment and other
8related costs for Public Health
9Management Corporation

 

10Project Allocation

10,000,000

11(Base Project Allocation -
12$10,000,000)

 

13(UUUU) Acquisition, infrastructure,
14construction, redevelopment and other
15related costs for St. Francis Villa
16housing project

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(52) Pike County

 

20(i) (Reserved)

 

21(53) Potter County

 

22(i) County projects

 

23(A) Acquisition, infrastructure,
24construction and other related costs
25for economic project

 

26Project Allocation

10,000,000

27(Base Project Allocation -
28$10,000,000)

 

29(54) Schuylkill County

 

30(i) Schuylkill Economic Development

 

1Corporation

 

2(A) Acquisition, infrastructure,
3construction, utilities extensions and
4roadway improvements for development
5of Schuylkill Airport Business Park in
6Foster Township

 

7Project Allocation

2,500,000

8(Base Project Allocation - $2,500,000)

 

9(B) Acquisition, infrastructure,
10construction and utilities extensions
11for expansion of Deer Lake Industrial
12Park

 

13Project Allocation

1,000,000

14(Base Project Allocation - $1,000,000)

 

15(C) Construction of industrial shell
16building at Tidewood Industrial Park

 

17Project Allocation

1,375,000

18(Base Project Allocation - $1,375,000)

 

19(D) Acquisition, infrastructure,
20construction and other related costs
21for rehabilitation of St. Catherine's
22Medical Complex located in Butler
23Township and retrofitting it into a
24multipurpose facility

 

25Project Allocation

2,000,000

26(Base Project Allocation - $2,000,000)

 

27(E) Construction of commercial and
28industrial buildings at Highridge
29Business Park

 

30Project Allocation

2,500,000

1(Base Project Allocation - $2,500,000)

 

2(F) Construction of industrial shell
3building at Highridge Business Park

 

4Project Allocation

2,925,000

5(Base Project Allocation - $2,925,000)

 

6(G) Acquisition, infrastructure,
7construction and utilities extensions
8for development and construction of
9400-acre business park

 

10Project Allocation

3,000,000

11(Base Project Allocation - $3,000,000)

 

12(ii) Coaldale Borough

 

13(A) Acquisition, infrastructure,
14renovation, construction and other
15related costs for development of
16outpatient medical facility and
17dialysis treatment center

 

18Project Allocation

2,500,000

19(Base Project Allocation - $2,500,000)

 

20(B) Infrastructure, rehabilitation,
21construction and other related costs
22for expansion of St. Luke's Miners
23Hospital

 

24Project Allocation

10,000,000

25(Base Project Allocation -
26$10,000,000)

 

27(iii) Mahanoy City Borough

 

28(A) Acquisition, infrastructure,
29renovation, construction and other
30related costs for development of new

 

1outpatient medical office building

 

2Project Allocation

1,500,000

3(Base Project Allocation - $1,500,000)

 

4(iv) Tamaqua Borough

 

5(A) Acquisition, infrastructure,
6renovation, construction and other
7related costs for development of
8facility to house state-of-the-art
9police station, antiblight education
10center, emergency center and
11magisterial district court

 

12Project Allocation

2,000,000

13(Base Project Allocation - $2,000,000)

 

14(B) Acquisition, infrastructure,
15renovation, construction and other
16related costs for new state-of-the-art
17public library, to be constructed in
18downtown historic district

 

19Project Allocation

2,500,000

20(Base Project Allocation - $2,500,000)

 

21(C) Acquisition, infrastructure,
22renovation, construction and other
23related costs for redevelopment of
24downtown business district

 

25Project Allocation

4,000,000

26(Base Project Allocation - $4,000,000)

 

27(D) Acquisition, infrastructure,
28renovation, construction, utilities
29extensions and other related costs for
30construction of high-tech industrial

 

1community park on east end of borough
2along Route 209

 

3Project Allocation

5,000,000

4(Base Project Allocation - $5,000,000)

 

5(55) Snyder County

 

6(i) (Reserved)

 

7(56) Somerset County

 

8(i) Somerset Borough

 

9(A) Construction, infrastructure and
10other costs related to Somerset
11Hospital campus improvement project

 

12Project Allocation

4,000,000

13(Base Project Allocation - $4,000,000)

 

14(ii) Somerset Township

 

15(A) Construction, infrastructure and
16other costs related to Twin Lakes
17Rehabilitation Center project

 

18Project Allocation

500,000

19(Base Project Allocation - $500,000)

 

20(57) Sullivan County

 

21(i) (Reserved)

 

22(58) Susquehanna County

 

23(i) The Progress Authority

 

24(A) Infrastructure improvements,
25renovations, construction and other
26related costs for improvements to Camp
27Archbald

 

28Project Allocation

1,000,000

29(Base Project Allocation - $1,000,000)

 

30(59) Tioga County

 

1(i) County projects

 

2(A) Acquisition, infrastructure,
3construction and other related costs
4for economic project

 

5Project Allocation

10,000,000

6(Base Project Allocation -
7$10,000,000)

 

8(ii) Tioga County Development Corporation

 

9(A) Design, engineering, site
10development, infrastructure,
11demolition, construction and other
12costs related to redevelopment of the
13former E. H. Hall, Inc./WESTAN Tannery
14brownfield site into Westfield
15Business Park

 

16Project Allocation

4,600,000

17(Base Project Allocation - $4,600,000)

 

18(60) Union County

 

19(i) (Reserved)

 

20(61) Venango County

 

21(i) Oil Region Alliance

 

22(A) Acquisition, infrastructure,
23construction and other related costs
24for development of senior living
25multiphase care facility, to include
26independent cottage campus, assisted
27living and nursing home care

 

28Project Allocation

7,000,000

29(Base Project Allocation - $7,000,000)

 

30(62) Warren County

 

1(i) County projects

 

2(A) Acquisition, infrastructure,
3construction and other related costs
4for economic project

 

5Project Allocation

10,000,000

6(Base Project Allocation -
7$10,000,000)

 

8(63) Washington County

 

9(i) County projects

 

10(A) Acquisition, construction,
11infrastructure, redevelopment and
12other costs related to mixed-use
13business park

 

14Project Allocation

2,000,000

15(Base Project Allocation - $2,000,000)

 

16(B) Acquisition, construction,
17infrastructure, redevelopment and
18other costs related to development of
19pad-ready sites along I-79 and Route
2019 corridor

 

21Project Allocation

5,000,000

22(Base Project Allocation - $5,000,000)

 

23(C) Acquisition, construction,
24infrastructure, redevelopment and
25other costs related to economic
26development projects

 

27Project Allocation

10,000,000

28(Base Project Allocation -
29$10,000,000)

 

30(ii) Allenport Borough

 

1(A) Acquisition, construction,
2infrastructure, redevelopment and
3other costs related to site
4improvement project at Mon River
5Industrial Park

 

6Project Allocation

10,000,000

7(Base Project Allocation -
8$10,000,000)

 

9(iii) Hanover Township

 

10(A) Acquisition, construction,
11infrastructure, redevelopment and
12other costs related to Starpointe
13Business Park expansion project

 

14Project Allocation

15,000,000

15(Base Project Allocation -
16$15,000,000)

 

17(iv) South Strabane Township

 

18(A) Acquisition, construction,
19infrastructure, redevelopment and
20other costs related to Zediker Station
21Business Park improvement project

 

22Project Allocation

10,000,000

23(Base Project Allocation -
24$10,000,000)

 

25(B) Acquisition, construction,
26infrastructure, redevelopment and
27other costs related to development of
28business park in the township

 

29Project Allocation

10,000,000

30(Base Project Allocation -

 

1$10,000,000)

 

2(C) Acquisition, construction,
3infrastructure, redevelopment and
4other costs related to locating sites
5for support companies for natural gas
6industry

 

7Project Allocation

3,000,000

8(Base Project Allocation - $3,000,000)

 

9(D) Acquisition, construction,
10infrastructure, redevelopment and
11other costs related to redevelopment
12of former industrial sites for new and
13expanding businesses

 

14Project Allocation

5,000,000

15(Base Project Allocation - $5,000,000)

 

16(E) Acquisition, construction,
17infrastructure, redevelopment and
18other costs related to Mon Valley
19receiving and loading facility
20development project

 

21Project Allocation

5,000,000

22(Base Project Allocation - $5,000,000)

 

23(F) Acquisition, construction,
24infrastructure, redevelopment and
25other costs related to development of
26sites adjacent to Washington County
27Airport for aviation-related business
28park

 

29Project Allocation

10,000,000

30(Base Project Allocation -

 

1$10,000,000)

 

2(G) Acquisition, construction,
3infrastructure, redevelopment and
4other costs related to Skypointe
5business park

 

6Project Allocation

5,000,000

7(Base Project Allocation - $5,000,000)

 

8(H) Acquisition, infrastructure,
9construction and other related costs
10for former foundry site mixed-use
11redevelopment project

 

12Project Allocation

3,000,000

13(Base Project Allocation - $3,000,000)

 

14(64) Wayne County

 

15(i) (Reserved)

 

16(65) Westmoreland County

 

17(i) County projects

 

18(A) Construction, renovation,
19modernization, reconstruction and
20expansion of Excela Health System
21Westmoreland Hospital Intensive Care
22and short-stay units

 

23Project Allocation

4,500,000

24(Base Project Allocation - $4,500,000)

 

25(B) Construction of Excela Health System
26Latrobe Ambulatory Care Center

 

27Project Allocation

10,000,000

28(Base Project Allocation -
29$10,000,000)

 

30(C) Construction of Excela Health System

 

1Orthopedic Center of Excellence

 

2Project Allocation

11,500,000

3(Base Project Allocation -
4$11,500,000)

 

5(ii) Latrobe Redevelopment Authority

 

6(A) Construction of LEED-certified
7multipurpose athletic, educational and
8cultural center

 

9Project Allocation

8,000,000

10(Base Project Allocation - $8,000,000)

 

11(iii) Westmoreland County Industrial
12Development Corporation

 

13(A) Acquisition, demolition, site
14preparation, environmental
15remediation, construction and other
16costs related to redevelopment of
17brownfield and blighted property in
18City of Jeannette for future
19commercial use

 

20Project Allocation

1,000,000

21(Base Project Allocation - $1,000,000)

 

22(B) Acquisition, infrastructure
23extensions and improvements,
24construction and other related costs
25for 150-acre industrial park

 

26Project Allocation

2,000,000

27(Base Project Allocation - $2,000,000)

 

28(iv) City of Lower Burrell

 

29(A) Acquisition, construction,
30demolition, infrastructure,

 

1redevelopment and other costs related
2to Lower Burrell redevelopment project
3for commercial reuse and development

 

4Project Allocation

2,000,000

5(Base Project Allocation - $2,000,000)

 

6(v) North Huntington Township

 

7(A) Construction and other related costs
8for development of regional facility
9to be utilized as a professional
10development center for effective
11teaching and learning of science,
12technology, engineering and
13mathematics

 

14Project Allocation

2,500,000

15(Base Project Allocation - $2,500,000)

 

16(66) Wyoming County

 

17(i) (Reserved)

 

18(67) York County

 

19(i) Redevelopment Authority of the City of
20York

 

21(A) Acquisition, infrastructure,
22renovation, construction and
23rehabilitation for revitalization of
24West Market Street between George and
25Beaver Streets

 

26Project Allocation

5,000,000

27(Base Project Allocation - $5,000,000)

 

28(B) Acquisition, infrastructure,
29renovation, construction and other
30related costs, including abatement of

 

1hazardous materials, for redevelopment
2of Northwest Triangle site and
3construction of commercial,
4residential and retail mixed-use
5facilities

 

6Project Allocation

6,000,000

7(Base Project Allocation - $6,000,000)

 

8(ii) Redevelopment Authority of the County of
9York

 

10(A) Infrastructure, renovation,
11construction and other related costs
12for redevelopment of downtown Hanover,
13including historic buildings, blighted
14buildings and Hanover State Theatre

 

15Project Allocation

8,000,000

16(Base Project Allocation - $8,000,000)

 

17(B) Infrastructure, construction and
18other related costs for renovations
19and rehabilitation of York College of
20Pennsylvania campuses, including
21classrooms, laboratories, offices and
22student support facilities

 

23Project Allocation

10,000,000

24(Base Project Allocation -
25$10,000,000)

 

26(C) Infrastructure, construction and
27other related costs for renovations
28and rehabilitation of York College of
29Pennsylvania's North Campus, including
30classrooms, laboratories, offices,

 

1student support and other academic
2facilities

 

3Project Allocation

12,000,000

4(Base Project Allocation -
5$12,000,000)

 

6(iii) City of York

 

7(A) Construction, renovation,
8infrastructure and other related costs
9for redevelopment and revitalization
10of Shipley Energy property

 

11Project Allocation

10,000,000

12(Base Project Allocation -
13$10,000,000)

 

14(68) Multiple Counties

 

15(i) Crawford, Erie, Mercer, Venango and
16Warren Counties

 

17(A) Acquisition, infrastructure,
18renovation and other related costs for
19demolition of existing structures and
20construction of several incubator
21facilities

 

22Project Allocation

5,000,000

23(Base Project Allocation - $5,000,000)

 

24(ii) Centre, Columbia, Lackawanna, Luzerne,
25Mifflin, Montour and Northumberland
26Counties

 

27(A) Acquisition, construction,
28infrastructure, redevelopment and
29other related costs for facilities to
30deliver medical services, conduct

 

1research and provide other related
2activities for Geisinger Health System

 

3Project Allocation

30,000,000

4(Base Project Allocation -
5$30,000,000)

 

6(iii) Pike and Wayne Counties

 

7(A) Wayne Economic Development
8Corporation, land acquisition,
9construction, infrastructure
10development and other related costs
11for career and technology center

 

12Project Allocation

11,000,000

13(Base Project Allocation -
14$11,000,000)

 

15(iv) Berks, Lehigh and York Counties

 

16(A) Redevelopment Authority of the City
17of York, acquisition, site
18preparation, infrastructure,
19construction and other related costs
20for Think Loud Development project in
21Cities of Reading, Allentown and York,
22including renovations and strategic
23reuse of historic properties and
24installation of fiber optic
25infrastructure

 

26Project Allocation

10,000,000

27(Base Project Allocation -
28$10,000,000)

 

29(v) Allegheny, Beaver, Cambria, Erie,
30Washington and Westmoreland Counties

 

1(A) Acquisition, construction,
2infrastructure, redevelopment and
3other costs related to Children's
4Hospital of Pittsburgh of UPMC

 

5Project Allocation

10,000,000

6(Base Project Allocation -
7$10,000,000)

 

8(vi) Lackawanna and Luzerne Counties

 

9(A) Acquisition, construction,
10infrastructure and other costs related
11to Mine Drainage Treatment Works
12project

 

13Project Allocation

18,000,000

14(Base Project Allocation -
15$18,000,000)

 

16(vii) Montgomery and Philadelphia Counties

 

17(A) Construction, infrastructure and
18other costs related to Saint Joseph's
19University improvement project

 

20Project Allocation

21,300,000

21(Base Project Allocation -
22$21,300,000)

 

23Section 7. Itemization of flood control projects.

24Additional capital projects in the category of flood control
25projects to be constructed by the Department of Environmental
26Protection, its successors or assigns, and to be financed by the
27incurring of debt are hereby itemized, together with their
28respective estimated costs, as follows:

29 

30Project

Total Project

Allocation

1(1) Department of Environmental Protection

 

2(i) Allegheny County

 

3(A) Funding for flood protection and
4rehabilitation of Pine Creek in Shaler
5Township

 

6Project Allocation

900,000

7(Base Project Allocation - $810,000)

 

8(Design & Contingencies - $90,000)

 

9(B) Infrastructure, construction and
10other costs related to Pine Creek
11Watershed flood control project,
12including reconstruction of culvert
13and retrofit of three existing
14detention basins

 

15Project Allocation

96,000

16(Base Project Allocation - $80,000)

 

17(Design & Contingencies - $16,000)

 

18(ii) Cambria County

 

19(A) Additional funding for DGS Project
20184-34, City of Johnstown, channel
21improvements to St. Clair Run,
22including rehabilitation and
23mitigation

 

24Project Allocation

1,350,000

25(Base Project Allocation - $1,215,000)

 

26(Design & Contingencies - $135,000)

 

27(B) Funding for flood protection of
28Solomon's Run, including
29rehabilitation and mitigation, in City
30of Johnstown

 

1Project Allocation

540,000

2(Base Project Allocation - $486,000)

 

3(Design & Contingencies - $54,000)

 

4(C) Rehabilitate five levee drainage
5structures along Chest Creek and
6Flannigan Run, including mitigation,
7in Patton Borough and Chest and Elder
8Townships

 

9Project Allocation

1,350,000

10(Base Project Allocation - $1,215,000)

 

11(Design & Contingencies - $135,000)

 

12(D) Funding for flood protection of
13Solomon's Run, including
14rehabilitation and mitigation, in
15Stonycreek Township and Dale Borough

 

16Project Allocation

900,000

17(Base Project Allocation - $810,000)

 

18(Design & Contingencies - $90,000)

 

19(iii) Delaware County

 

20(A) Construction, infrastructure and
21other costs related to installation of
22stream gauge on Darby Creek

 

23Project Allocation

538,000

24(Base Project Allocation - $538,000)

 

25(B) Acquisition, demolition,
26construction, infrastructure and other
27costs related to Darby Borough flood
28remediation program

 

29Project Allocation

6,200,000

30(Base Project Allocation - $6,200,000)

 

1(iv) Lackawanna County

 

2(A) Rehabilitate seven levee drainage
3structures along Lackawanna River,
4including mitigation, in Mayfield
5Borough

 

6Project Allocation

2,700,000

7(Base Project Allocation - $2,430,000)

 

8(Design & Contingencies - $270,000)

 

9(B) Funding for Moosic flood protection
10project, including rehabilitation and
11mitigation, along Spring Creek

 

12Project Allocation

2,700,000

13(Base Project Allocation - $2,430,000)

 

14(Design & Contingencies - $270,000)

 

15(C) Funding for Blakely flood protection
16project, including rehabilitation and
17mitigation, along Hull Creek in
18Blakely and Dickson City Boroughs

 

19Project Allocation

900,000

20(Base Project Allocation - $810,000)

 

21(Design & Contingencies - $90,000)

 

22(D) Funding for Scranton flood control
23project, including rehabilitation and
24mitigation, along Roaring Brook

 

25Project Allocation

4,500,000

26(Base Project Allocation - $4,050,000)

 

27(Design & Contingencies - $450,000)

 

28(E) Construction, infrastructure and
29other related costs for Racket Brook
30Creek retaining wall replacement

 

1project in City of Carbondale

 

2Project Allocation

1,540,000

3(Base Project Allocation - $1,540,000)

 

4(F) Construction, infrastructure and
5other related costs for Mayfield
6Borough levee extension project

 

7Project Allocation

772,000

8(Base Project Allocation - $772,000)

 

9(v) Luzerne County

 

10(A) Additional funding for DGS Project
11182-3, flood protection project for
12Wadham Creek, including rehabilitation
13and mitigation, in Plymouth Borough

 

14Project Allocation

540,000

15(Base Project Allocation - $486,000)

 

16(Design & Contingencies - $54,000)

 

17(B) Funding for Mocanaqua flood
18protection project, including
19rehabilitation and mitigation along
20Turtle Creek, in Conyngham Township

 

21Project Allocation

540,000

22(Base Project Allocation - $486,000)

 

23(Design & Contingencies - $54,000)

 

24(vi) Montgomery County

 

25(A) Funding for Ambler flood protection
26project, including acquisition,
27infrastructure, rehabilitation and
28construction of storm water bypass
29facility, culverts and upstream
30neighborhood regional detention basins

 

1Project Allocation

2,475,000

2(Base Project Allocation - $2,250,000)

 

3(Design & Contingencies - $225,000)

 

4(B) Funding for Turnpike Drive storm
5water improvement project, including
6infrastructure, rehabilitation and
7construction of regional storm water
8management basin in Upper Moreland
9Township

 

10Project Allocation

550,000

11(Base Project Allocation - $500,000)

 

12(Design & Contingencies - $50,000)

 

13(C) Acquisition, construction,
14infrastructure and other costs related
15to Glenside Flood Control buyout
16project in Cheltenham Township

 

17Project Allocation

8,000,000

18(Base Project Allocation - $8,000,000)

 

19(D) Construction, infrastructure and
20other costs related to flood control
21improvement projects in headwaters of
22Tookany Creek in Cheltenham Township

 

23Project Allocation

1,000,000

24(Base Project Allocation - $1,000,000)

 

25(E) Construction, infrastructure and
26other costs related to Glenside flood
27control project Phase II in Cheltenham
28Township

 

29Project Allocation

5,000,000

30(Base Project Allocation - $5,000,000)

 

1(vii) Northampton County

 

2(A) Permanent reconstruction of storm
3sewer system causing the flooding of
4private, residential properties in
5Bangor Borough

 

6Project Allocation

506,000

7(Base Project Allocation - $506,000)

 

8(viii) Potter County

 

9(A) Rehabilitate three levee drainage
10structures along Allegheny River and
11Mill Creek, including mitigation, in
12Coudersport Borough

 

13Project Allocation

900,000

14(Base Project Allocation - $810,000)

 

15(Design & Contingencies - $90,000)

 

16(ix) Schuylkill County

 

17(A) Funding for McAdoo flood protection
18project, including rehabilitation and
19mitigation, along Celebration Creek in
20McAdoo, Kline and Banks Townships

 

21Project Allocation

540,000

22(Base Project Allocation - $486,000)

 

23(Design & Contingencies - $54,000)

 

24(x) Somerset County

 

25(A) Rehabilitate 25 levee drainage
26structures along Paint Creek,
27including mitigation, in Windber and
28Paint Boroughs

 

29Project Allocation

4,950,000

30(Base Project Allocation - $4,455,000)

 

1(Design & Contingencies - $495,000)

 

2(B) Rehabilitate 18 levee drainage
3structures along Coxes Creek,
4including mitigation, in Rockwood
5Borough

 

6Project Allocation

3,600,000

7(Base Project Allocation - $3,240,000)

 

8(Design & Contingencies - $360,000)

 

9(C) Construction, infrastructure and
10other costs related to North Fork dam
11and bridge modifications and repair
12project

 

13Project Allocation

10,000,000

14(Base Project Allocation -
15$10,000,000)

 

16(xi) Warren County

 

17(A) Rehabilitate nine levee drainage
18structures along Glade Run, including
19mitigation, in City of Warren

 

20Project Allocation

1,800,000

21(Base Project Allocation - $1,620,000)

 

22(Design & Contingencies - $180,000)

 

23(xii) Wayne County

 

24(A) Funding for White Mills channel
25improvement project, including
26rehabilitation and mitigation along
27Lollipop Creek, at White Mills
28Village, Texas Township

 

29Project Allocation

540,000

30(Base Project Allocation - $486,000)

 

1(Design & Contingencies - $54,000)

 

2(xiii) Westmoreland County

 

3(A) Rehabilitate existing flood
4protection along Jacks Run, including
5levee rehabilitation, slope
6stabilization, flood wall repairs,
7concrete channel construction and
8replacement of three drainage
9structures in South Greensburg Borough

 

10Project Allocation

3,600,000

11(Base Project Allocation - $3,240,000)

 

12(Design & Contingencies - $360,000)

 

13(xiv) Somerset and Fayette Counties

 

14(A) Rehabilitate 18 levee drainage
15structures along the Youghiogheny and
16Casselman Rivers, including
17mitigation, in Confluence Borough

 

18Project Allocation

4,050,000

19(Base Project Allocation - $3,645,000)

 

20(Design & Contingencies - $405,000)

 

21(xv) Chester, Delaware and Montgomery
22Counties

 

23(A) Regional watershed improvement
24project, including funding for ACE
25feasibility study

 

26Project Allocation

125,000

27(Base Project Allocation - $125,000)

 

28Section 8. Itemization of Keystone Recreation, Park and
29Conservation Fund projects.

30Projects in the category of public improvement projects to be

1constructed by the Department of Conservation and Natural
2Resources, its successors or assigns and to be financed by
3current revenues of the Keystone Recreation, Park and
4Conservation Fund are hereby itemized, together with their
5respective estimated costs, as follows:

6 

7Project

Total Project
Allocation

8(1) Department of Conservation and Natural
9Resources

 

10(i) Bald Eagle State Forest

 

11(A) Rehabilitate or replace Sand Mountain
12Trail

 

13Project Allocation

316,000

14(Base Project Allocation - $316,000)

 

15(B) Upgrade sewage treatment plant

 

16Project Allocation

500,000

17(Base Project Allocation - $500,000)

 

18(ii) Bald Eagle State Park

 

19(A) Renovate park office to meet
20accessibility requirements and improve
21visitor services

 

22Project Allocation

1,000,000

23(Base Project Allocation - $1,000,000)

 

24(iii) Blue Knob State Park

 

25(A) Pave and replace culverts at Willow
26Springs Road

 

27Project Allocation

250,000

28(Base Project Allocation - $250,000)

 

29(iv) Buchanan State Forest

 

30(A) Construct Buchanan Resource

 

1Management Center

 

2Project Allocation

1,750,000

3(Base Project Allocation - $1,750,000)

 

4(v) Caledonia State Park

 

5(A) Replace shower houses and comfort
6stations in Chinquapin Hill Campground
7and renovate campsites

 

8Project Allocation

1,300,000

9(Base Project Allocation - $1,300,000)

 

10(vi) Codorus State Park

 

11(A) Replace sailboat areas and restrooms
12and rehabilitate sewage system

 

13Project Allocation

450,000

14(Base Project Allocation - $450,000)

 

15(vii) Cook Forest State Park

 

16(A) Rehabilitate water storage tanks,
17including cleaning, painting,
18replacing level controls and
19maintenance access

 

20Project Allocation

600,000

21(Base Project Allocation - $600,000)

 

22(B) Repair sewage line inflow and
23infiltration

 

24Project Allocation

250,000

25(Base Project Allocation - $250,000)

 

26(viii) Cook State Forest

 

27(A) Replace sewage lines

 

28Project Allocation

175,000

29(Base Project Allocation - $175,000)

 

30(ix) Delaware Canal State Park

 

1(A) Replace Ferry Street Bridge

 

2Project Allocation

900,000

3(Base Project Allocation - $900,000)

 

4(B) Replace Smithtown Bridge No. 5

 

5Project Allocation

800,000

6(Base Project Allocation - $800,000)

 

7(C) Replace or rehabilitate Phillips
8Mills, Smithtown No. 3 and Lower
9Limeport Bridges

 

10Project Allocation

1,200,000

11(Base Project Allocation - $1,200,000)

 

12(x) Denton Hill State Park

 

13(A) Upgrade, rehabilitation or
14replacement of ski lift, lighting,
15equipment, parking and structures to
16improve operations and safety to
17public

 

18Project Allocation

750,000

19(Base Project Allocation - $750,000)

 

20(xi) Evansburg State Park

 

21(A) Replace sewer lines throughout park

 

22Project Allocation

480,000

23(Base Project Allocation - $480,000)

 

24(xii) Frances Slocum State Park

 

25(A) Upgrade sewage treatment plant,
26including infrastructure

 

27Project Allocation

1,500,000

28(Base Project Allocation - $1,500,000)

 

29(xiii) Gifford Pinchot State Park

 

30(A) Rehabilitate five shower houses

 

1Project Allocation

1,500,000

2(Base Project Allocation - $1,500,000)

 

3(xiv) Hickory Run State Park

 

4(A) Replace pit latrines with modern
5comfort stations in two organized
6group camps

 

7Project Allocation

2,200,000

8(Base Project Allocation - $2,200,000)

 

9(xv) Hills Creek State Park

 

10(A) Rehabilitate sewage treatment plant,
11sewer lines and lift stations

 

12Project Allocation

250,000

13(Base Project Allocation - $250,000)

 

14(B) Replace campground washhouses

 

15Project Allocation

2,500,000

16(Base Project Allocation - $2,500,000)

 

17(xvi) Lackawanna State Park

 

18(A) Rehabilitate pool complex and day use
19area, including renovation of bath
20houses and addition of space for
21lifeguard and first aid station

 

22Project Allocation

3,000,000

23(Base Project Allocation - $3,000,000)

 

24(xvii) Laurel Ridge State Park

 

25(A) Replace Laurel Highlands Hiking Trail
26Bridge within the park and construct
27horse trail and parking/camping
28facilities at Bakers Run

 

29Project Allocation

1,600,000

30(Base Project Allocation - $1,600,000)

 

1(xviii) Little Pine State Park

 

2(A) Rehabilitate shooting range to meet
3current safety and accessibility
4standards

 

5Project Allocation

400,000

6(Base Project Allocation - $400,000)

 

7(xix) Loyalsock State Forest

 

8(A) Rehabilitate Hillsgrove Ranger
9Station equipment storage shed

 

10Project Allocation

525,000

11(Base Project Allocation - $525,000)

 

12(B) Repair Pleasant Stream Road

 

13Project Allocation

200,000

14(Base Project Allocation - $200,000)

 

15(C) Repair Sones Pond Dam, including
16replacing outlet structure and
17repairing embankment

 

18Project Allocation

300,000

19(Base Project Allocation - $300,000)

 

20(xx) Moraine State Park

 

21(A) Upgrade sewage treatment plant

 

22Project Allocation

3,500,000

23(Base Project Allocation - $3,500,000)

 

24(B) Rehabilitate and upgrade water
25treatment plant

 

26Project Allocation

1,500,000

27(Base Project Allocation - $1,500,000)

 

28(xxi) Nescopeck State Park

 

29(A) Construct culvert at Riley's Pond

 

30Project Allocation

600,000

1(Base Project Allocation - $600,000)

 

2(xxii) Nockamixon State Park

 

3(A) Replace pit latrines with modern
4comfort stations

 

5Project Allocation

650,000

6(Base Project Allocation - $650,000)

 

7(B) Replace boat rental docks

 

8Project Allocation

400,000

9(Base Project Allocation - $400,000)

 

10(xxiii) Ohiopyle State Park

 

11(A) Repair sewage collection system and
12sewage treatment plant to meet current
13effluent standards

 

14Project Allocation

3,500,000

15(Base Project Allocation - $3,500,000)

 

16(xxiv) Park Region 1

 

17(A) Renovate or replace HVAC system at
18regional office

 

19Project Allocation

250,000

20(Base Project Allocation - $250,000)

 

21(xxv) Presque Isle State Park

 

22(A) Provide for road flooding mitigation,
23Predisaster Mitigation Grant Project

 

24Project Allocation

400,000

25(Base Project Allocation - $400,000)

 

26(B) Replace sand mound Phase 4 B11 and
27B10

 

28Project Allocation

250,000

29(Base Project Allocation - $250,000)

 

30(xxvi) Prince Gallitzin State Park

 

1(A) Rehabilitate Beaver Valley Marina

 

2Project Allocation

3,000,000

3(Base Project Allocation - $3,000,000)

 

4(xxvii) Pymatuning State Park

 

5(A) Connect Jamestown sewage to sewer
6authority

 

7Project Allocation

500,000

8(Base Project Allocation - $500,000)

 

9(B) Demolish sewage treatment plant at
10Linesville

 

11Project Allocation

250,000

12(Base Project Allocation - $250,000)

 

13(C) Rehabilitate Linesville Livery

 

14Project Allocation

2,000,000

15(Base Project Allocation - $2,000,000)

 

16(xxviii) Ricketts Glen State Park

 

17(A) Replace pit latrine along Route 118
18with modern flush facility

 

19Project Allocation

400,000

20(Base Project Allocation - $400,000)

 

21(B) Replace dam controls and outlet works

 

22Project Allocation

800,000

23(Base Project Allocation - $800,000)

 

24(xxix) Ridley Creek State Park

 

25(A) Renovate mansion kitchen

 

26Project Allocation

250,000

27(Base Project Allocation - $250,000)

 

28(xxx) Salt Springs State Park

 

29(A) Replace existing sanitary station
30with new comfort station, including

 

1infrastructure

 

2Project Allocation

437,000

3(Base Project Allocation - $437,000)

 

4(xxxi) Shawnee State Park

 

5(A) Pave areas near and around
6campgrounds

 

7Project Allocation

250,000

8(Base Project Allocation - $250,000)

 

9(xxxii) Shikellamy State Park

 

10(A) Construct permanent causeway

 

11Project Allocation

1,500,000

12(Base Project Allocation - $1,500,000)

 

13(B) Replace Bag Nos. 6 and 7 and
14construct permanent causeway

 

15Project Allocation

1,000,000

16(Base Project Allocation - $1,000,000)

 

17(xxxiii) Sinnemahoning State Park

 

18(A) Rehabilitate dam gates operators,
19including electrical repairs

 

20Project Allocation

250,000

21(Base Project Allocation - $250,000)

 

22(xxxiv) Sproul State Forest

 

23(A) Rehabilitate Baker's Run horse
24trailer parking/camping

 

25Project Allocation

250,000

26(Base Project Allocation - $250,000)

 

27(B) Rehabilitate Baker's Run boat launch
28and canoe access

 

29Project Allocation

200,000

30(Base Project Allocation - $200,000)

 

1(C) Construct Hyner hang gliding landing
2strip within park

 

3Project Allocation

225,000

4(Base Project Allocation - $225,000)

 

5(xxxv) Susquehannock State Park

 

6(A) Rehabilitate roads and drainage and
7pave main park roads

 

8Project Allocation

250,000

9(Base Project Allocation - $250,000)

 

10(xxxvi) Tiadaghton State Forest

 

11(A) Relocate Trout Run Road

 

12Project Allocation

225,000

13(Base Project Allocation - $225,000)

 

14(xxxvii) Tobyhanna State Park

 

15(A) Pave roads throughout park

 

16Project Allocation

350,000

17(Base Project Allocation - $350,000)

 

18(xxxviii) Weiser State Forest

 

19(A) Construct Weiser Resource Management
20Center

 

21Project Allocation

3,300,000

22(Base Project Allocation - $3,300,000)

 

23(xxxix) Worlds End State Park

 

24(A) Reconstruct cabin area access

 

25Project Allocation

2,000,000

26(Base Project Allocation - $2,000,000)

 

27(xl) Yellow Creek State Park

 

28(A) Rehabilitate beach area buildings

 

29Project Allocation

600,000

30(Base Project Allocation - $600,000)

 

1Section 9. Itemization of State forestry bridge projects.

2Projects in the category of State forestry bridge projects to
3be constructed by the Department of Conservation and Natural
4Resources, its successors or assigns, and to be financed by oil
5company franchise tax revenues pursuant to 75 Pa.C.S. §
69502(a)(2)(iv) (related to imposition of tax) are hereby
7itemized, together with their respective estimated costs, as
8follows:

9 

10Project

Total Project
Allocation

11(1) Cameron County

 

12(i) Elk State Forest

 

13(A) Rehabilitate Whitehead Road/Whitehead
14Run - 9000

 

15Project Allocation

250,000

16(Base Project Allocation - $250,000)

 

17(B) Replace bridge on Whitehead Road over
18Whitehead Run

 

19Project Allocation

250,000

20(Base Project Allocation - $250,000)

 

21(C) Replace bridge on Naval Hollow Road
22over Naval Hollow Creek

 

23Project Allocation

150,000

24(Base Project Allocation - $150,000)

 

25(D) Replace bridge on Ford -
26administration road over East Branch
27of Hicks Run

 

28Project Allocation

250,000

29(Base Project Allocation - $250,000)

 

30(E) Replace bridge on Bell Draft Road

 

1over McDonald Run

 

2Project Allocation

300,000

3(Base Project Allocation - $300,000)

 

4(F) Replace bridge on Bell Draft Road
5over Bell Draft Run

 

6Project Allocation

200,000

7(Base Project Allocation - $200,000)

 

8(G) Replace bridge on Bell Draft Road
9over Shaffer Draft

 

10Project Allocation

150,000

11(Base Project Allocation - $150,000)

 

12(2) Centre County

 

13(i) Moshannon State Forest

 

14(A) Replace Shirks Road over Black
15Moshannon Creek Bridge No. 9-0028

 

16Project Allocation

300,000

17(Base Project Allocation - $300,000)

 

18(B) Replace Clay Mine Road over Six Mile
19Run - No. 0029 bridge and Huckleberry
20Road over Black Moshannon Creek - No.
210016

 

22Project Allocation

700,000

23(Base Project Allocation - $700,000)

 

24(3) Clarion County

 

25(i) Kittanning State Forest

 

26(A) Replace bridge on Corbett Road over
27Little Clear Creek and bridge on
28Corbett Road over Clear Creek

 

29Project Allocation

400,000

30(Base Project Allocation - $400,000)

 

1(4) Clearfield County

 

2(i) Moshannon State Forest

 

3(A) Replace bridge on Laurel Ridge Road
4over Laurel Run and bridge on Jack
5Dent Road over Medix Run

 

6Project Allocation

650,000

7(Base Project Allocation - $650,000)

 

8(B) Replace bridge on Ames Road over Deer
9Creek

 

10Project Allocation

200,000

11(Base Project Allocation - $200,000)

 

12(5) Clinton County

 

13(i) Sproul State Forest

 

14(A) Replace Beaver Dam Road over left
15fork of Beaver Dam Run

 

16Project Allocation

400,000

17(Base Project Allocation - $400,000)

 

18(B) Replace culvert at Little Greenlick
19Road over Little Greenlick Run

 

20Project Allocation

250,000

21(Base Project Allocation - $250,000)

 

22(C) Replace Birch Island Road over Amos
23Branch Bridge No. 10-0040

 

24Project Allocation

300,000

25(Base Project Allocation - $300,000)

 

26(D) Replace State Line Road over Beauty
27Run Bridge No. 10-0029

 

28Project Allocation

325,000

29(Base Project Allocation - $325,000)

 

30(E) Replace bridge on Graham Road over

 

1Ferney Road

 

2Project Allocation

200,000

3(Base Project Allocation - $200,000)

 

4(F) Replace bridge on Penrose Road over
5box culvert, near intersection with
6Coon Run Road

 

7Project Allocation

150,000

8(Base Project Allocation - $150,000)

 

9(G) Replace bridge on Birch Island Road
10over Amos Branch

 

11Project Allocation

175,000

12(Base Project Allocation - $175,000)

 

13(H) Replace bridge on Slate Line Road
14over Beauty Run

 

15Project Allocation

200,000

16(Base Project Allocation - $200,000)

 

17(6) Elk County

 

18(i) Elk State Forest

 

19(A) Replace Dents Run Road over Bear
20Hollow No. 13-9005 and Weatherboard
21Run No. 13-9006

 

22Project Allocation

500,000

23(Base Project Allocation - $500,000)

 

24(B) Replace Bridge No. 13-9025, Little
25Dents Road over Little Dents Run

 

26Project Allocation

200,000

27(Base Project Allocation - $200,000)

 

28(7) Huntingdon County

 

29(i) Rothrock State Forest

 

30(A) Replace old culvert at Laurel Run

 

1Road with box culvert over tributary
2to Galbraith Gap Run

 

3Project Allocation

100,000

4(Base Project Allocation - $100,000)

 

5(B) Rehabilitate bridge at Crowfield Road
6over Standing Stone Creek

 

7Project Allocation

150,000

8(Base Project Allocation - $150,000)

 

9(C) Replace pipe culvert at Thickhead
10Mountain Road over Sinking Creek

 

11Project Allocation

200,000

12(Base Project Allocation - $200,000)

 

13(D) Replace three small box culverts at
14Martin and Frew Roads

 

15Project Allocation

500,000

16(Base Project Allocation - $500,000)

 

17(E) Replace bridge at Beidler Road over
18Laurel Run

 

19Project Allocation

350,000

20(Base Project Allocation - $350,000)

 

21(F) Replace bridge on Lingle Valley Road
22over Laurel Creek

 

23Project Allocation

350,000

24(Base Project Allocation - $350,000)

 

25(G) Replace bridges on Martin Gap Road 1
26and 2 and on Frew Road

 

27Project Allocation

600,000

28(Base Project Allocation - $600,000)

 

29(H) Replace bridge on Diamond Valley Road
30over Globe Run, No. 5-0023, No. 24

 

1Project Allocation

400,000

2(Base Project Allocation - $400,000)

 

3(I) Replace bridge on Crowfield Road over
4Standing Stone Creek

 

5Project Allocation

150,000

6(Base Project Allocation - $150,000)

 

7(J) Replace bridge on Thickhead Mountain
8Road over Sinking Creek

 

9Project Allocation

200,000

10(Base Project Allocation - $200,000)

 

11(K) Replace bridge on Laurel Run Road
12over tributary to Galbraith Gap Run

 

13Project Allocation

175,000

14(Base Project Allocation - $175,000)

 

15(8) Lycoming County

 

16(i) Tiadaghton State Forest

 

17(A) Replace Four Frances Road/Slate Run
18Road structures

 

19Project Allocation

800,000

20(Base Project Allocation - $800,000)

 

21(ii) Tioga State Forest

 

22(A) Replace Owasse Road/Chimney Hollow

 

23Project Allocation

175,000

24(Base Project Allocation - $175,000)

 

25(B) Replace Cedar Mountain Road over
26Cedar Run Bridge No. 16-0014

 

27Project Allocation

300,000

28(Base Project Allocation - $300,000)

 

29(C) Replace Landrus Road at South Creek -
30No. 0023

 

1Project Allocation

325,000

2(Base Project Allocation - $325,000)

 

3(D) Replace Spoor Hollow Road over Norris
4Brook Bridge No. 16-0001

 

5Project Allocation

325,000

6(Base Project Allocation - $325,000)

 

7(E) Replace bridge on Zinck Fork Road
8over Upper Pine Bottom, No. 12-0047

 

9Project Allocation

250,000

10(Base Project Allocation - $250,000)

 

11(F) Replace bridges on Slate Run Road
12over Manor Fork No. 12-0041, Daugherty
13Run No. 12-9006 and culvert at Fill
14Trestle No. 12-9028

 

15Project Allocation

600,000

16(Base Project Allocation - $600,000)

 

17(G) Replace bridge on Cove Road over
18Fourth Gap

 

19Project Allocation

250,000

20(Base Project Allocation - $250,000)

 

21(H) Replace bridge on English Run Road
22over English Run

 

23Project Allocation

325,000

24(Base Project Allocation - $325,000)

 

25(I) Replace bridge on Lower Pine Road
26over Lower Pine Bottom Run

 

27Project Allocation

350,000

28(Base Project Allocation - $350,000)

 

29(9) Monroe County

 

30(i) Delaware State Forest

 

1(A) Replace bridge on Five Mile Meadow
2Road over unnamed creek and bridge on
3Five Mile Meadow Road over Little
4Bushkill Creek

 

5Project Allocation

300,000

6(Base Project Allocation - $300,000)

 

7(B) Replace bridge on Bald Hill Road over
8unnamed creek

 

9Project Allocation

280,000

10(Base Project Allocation - $280,000)

 

11(10) Perry County

 

12(i) Tuscarora State Forest

 

13(A) Replace bridge over Couch Road

 

14Project Allocation

150,000

15(Base Project Allocation - $150,000)

 

16(B) Replace bridge at Colonel Denning
17Road over Doubling Gap Creek

 

18Project Allocation

175,000

19(Base Project Allocation - $175,000)

 

20(C) Replace bridge on Gunter Valley Road
21over Trout Run

 

22Project Allocation

200,000

23(Base Project Allocation - $200,000)

 

24(D) Replace Meadow Run Road Bridge over
25Laurel Run

 

26Project Allocation

300,000

27(Base Project Allocation - $300,000)

 

28(E) Replace bridge on Couch Road

 

29Project Allocation

150,000

30(Base Project Allocation - $150,000)

 

1(F) Replace bridge on Gunter Valley

 

2Project Allocation

200,000

3(Base Project Allocation - $200,000)

 

4(G) Replace bridge on access road for
5Colonel Denning over Doubling Gap
6Creek

 

7Project Allocation

175,000

8(Base Project Allocation - $175,000)

 

9(11) Potter County

 

10(i) Elk State Forest

 

11(A) Replace structures for Bridge No. 13-
120045, East Cowley Run Road over East
13Cowley Run

 

14Project Allocation

300,000

15(Base Project Allocation - $300,000)

 

16(ii) Susquehannock State Forest

 

17(A) Replace Bridge No. 15-9013, Nelson
18Run Road over Gas Well Hollow

 

19Project Allocation

200,000

20(Base Project Allocation - $200,000)

 

21(12) Schuylkill County

 

22(i) Weiser State Forest

 

23(A) Construct a roadway and culvert over
24stream at Jefferson Tract and Road in
25South Manheim Township

 

26Project Allocation

200,000

27(Base Project Allocation - $200,000)

 

28(B) Replace White Oak Road over Wolf Run
29and Mud Run and Lykens Road - No. 9000

 

30Project Allocation

400,000

1(Base Project Allocation - $400,000)

 

2(C) Construct culvert at Weaver Road,
3Second Mountain over unnamed tributary

 

4Project Allocation

200,000

5(Base Project Allocation - $200,000)

 

6(D) Replace bridge on Jefferson Tract and
7Road

 

8Project Allocation

200,000

9(Base Project Allocation - $200,000)

 

10(E) Replace bridge on Weaver Road, Second
11Mountain over ford crossing

 

12Project Allocation

200,000

13(Base Project Allocation - $200,000)

 

14(F) Replace bridges on White Oak over
15Wolf Run and White Oak over Mud Run

 

16Project Allocation

400,000

17(Base Project Allocation - $400,000)

 

18(G) Replace bridges on Roaring Creek
19Tract

 

20Project Allocation

700,000

21(Base Project Allocation - $700,000)

 

22(13) Somerset County

 

23(i) Forbes State Forest

 

24(A) Replace three bridges at South Wolf
25Rock Road

 

26Project Allocation

600,000

27(Base Project Allocation - $600,000)

 

28(B) Rehabilitate Jones Mill Run Road and
29Blue Hole Road bridges, widen roads
30and replace deck bridge with precast

 

1box culvert

 

2Project Allocation

600,000

3(Base Project Allocation - $600,000)

 

4(ii) Gallitzin State Forest

 

5(A) Replace culvert at Shade Road over
6unnamed tributary to Shade Creek

 

7Project Allocation

250,000

8(Base Project Allocation - $250,000)

 

9(14) Sullivan County

 

10(i) Loyalsock State Forest

 

11(A) Rehabilitate Yellow Dog Road over
12Rock Run - No. 0017

 

13Project Allocation

350,000

14(Base Project Allocation - $350,000)

 

15(B) Rehabilitate Hillsgrove Road over
16tributary to Pleasant Stream, No. 12-
179018

 

18Project Allocation

250,000

19(Base Project Allocation - $250,000)

 

20(C) Replace Bridge No. 20-9011, High Knob
21Road over Ketchum Run

 

22Project Allocation

250,000

23(Base Project Allocation - $250,000)

 

24(D) Replace bridge on Rock Run Road over
25Loyalsock Creek

 

26Project Allocation

300,000

27(Base Project Allocation - $300,000)

 

28(15) Tioga County

 

29(i) Tioga State Forest

 

30(A) Replace bridge on Cedar Mountain Road

 

1over Cedar Mountain Run

 

2Project Allocation

300,000

3(Base Project Allocation - $300,000)

 

4(B) Replace bridge on Owasee Road over
5Chimney Hollow

 

6Project Allocation

175,000

7(Base Project Allocation - $175,000)

 

8(C) Replace bridge on Spoor Hollow Road
9over Norris Brook

 

10Project Allocation

325,000

11(Base Project Allocation - $325,000)

 

12(D) Replace bridge on Landrus Road over
13South Creek

 

14Project Allocation

325,000

15(Base Project Allocation - $325,000)

 

16(16) Union County

 

17(i) Bald Eagle State Forest

 

18(A) Replace bridge on Bear Run Road over
19Bear Run Creek

 

20Project Allocation

250,000

21(Base Project Allocation - $250,000)

 

22(17) Westmoreland County

 

23(i) Forbes State Forest

 

24(A) Replace bridge on South Wolfe Rock
25Road over tributary to Tub Mill Run
26and bridge on South Wolfe Rock Road
27over Tub Mill Run

 

28Project Allocation

600,000

29(Base Project Allocation - $600,000)

 

30Section 10. Itemization of State ATV/Snowmobile Fund current

1revenue projects.

2Projects in the category of State ATV/Snowmobile Fund
3projects to be constructed by the Department of Conservation and
4Natural Resources, its successors or assigns, and to be financed
5from State ATV/Snowmobile Fund current revenue are hereby
6itemized, together with their respective estimated costs, as
7follows:

8 

9Project

Total Project
Allocation

10(1) Berks County

 

11(i) French Creek State Park

 

12(A) Construct Schuylkill River trail
13connection

 

14Project Allocation

500,000

15(Base Project Allocation - $500,000)

 

16(2) Monroe County

 

17(i) Delaware State Forest

 

18(A) Construct or rehabilitate ATV trail
19in Dixon Miller Recreation Area

 

20Project Allocation

250,000

21(Base Project Allocation - $250,000)

 

22Section 11. Itemization of Manufacturing Fund current revenue
23projects.

24The individual capital projects in the category of public
25improvement projects to be developed by the Department of
26General Services, its successors or assigns, for the Department
27of Corrections, and to be financed from current revenues of the
28Manufacturing Fund are hereby itemized, together with their
29respective estimated costs, as follows:

30 

 

1Project

Total Project




Allocation

2(1) Department of Corrections

 

3(i) State Correctional Institution at Forest

 

4(A) Interior construction of Correctional
5Institute building to provide for
6correctional incentives program

 

7Project Allocation

7,500,000

8(Base Project Allocation - $6,000,000)

 

9(Design & Contingencies - $1,500,000)

 

10Section 12. Debt authorization.

11(a) Public improvements.--The Governor, Auditor General and
12State Treasurer are hereby authorized and directed to borrow
13from time to time in addition to any authorization heretofore or
14hereafter enacted, on the credit of the Commonwealth, subject to
15the limitations provided in the current capital budget, money
16not exceeding in the aggregate the sum of $2,312,964,000 as may
17be found necessary to carry out the acquisition and construction
18of the public improvement projects specifically itemized in a
19capital budget.

20(b) Furniture and equipment.--The Governor, Auditor General
21and State Treasurer are hereby authorized and directed to borrow
22from time to time in addition to any authorization heretofore or
23hereafter enacted, on the credit of the Commonwealth, subject to
24the limitations provided in the current capital budget, money
25not exceeding in the aggregate the sum of $104,300,000 as may be
26found necessary to carry out the acquisition and construction of
27the public improvement projects consisting of the acquisition of
28original movable furniture and equipment specifically itemized
29in a capital budget.

30(c) Transportation assistance.--The Governor, Auditor

1General and State Treasurer are hereby authorized and directed
2to borrow from time to time in addition to any authorization
3heretofore or hereafter enacted, on the credit of the
4Commonwealth, subject to the limitations provided in the current
5capital budget, money not exceeding in the aggregate the sum of
6$1,314,124,000 as may be found necessary to carry out the
7acquisition and construction of the transportation assistance
8projects specifically itemized in a capital budget.

9(d) Redevelopment assistance.--Subject to the limitation in
10section 317(b) of the act of February 9, 1999 (P.L.1, No.1), 
11known as the Capital Facilities Debt Enabling Act, the Governor, 
12Auditor General and State Treasurer are hereby authorized and 
13directed to borrow from time to time in addition to any 
14authorization heretofore or hereafter enacted, on the credit of 
15the Commonwealth, subject to the limitations provided in the 
16current capital budget, money not exceeding in the aggregate the 
17sum of $3,181,261,000 as may be found necessary to carry out the 
18redevelopment assistance capital projects specifically itemized 
19in a capital budget.

20(e) Flood control.--The Governor, Auditor General and State
21Treasurer are hereby authorized and directed to borrow from time
22to time in addition to any authorization heretofore or hereafter
23enacted, on the credit of the Commonwealth, subject to the
24limitations provided in the current capital budget, money not
25exceeding in the aggregate the sum of $73,702,000 as may be
26found necessary to carry out the acquisition and construction of
27the flood control projects specifically itemized in a capital
28budget.

29Section 13. Issue of bonds.

30The indebtedness authorized in this act shall be incurred

1from time to time and shall be evidenced by one or more series
2of general obligation bonds of the Commonwealth in such
3aggregate principal amount for each series as the Governor, the
4Auditor General and the State Treasurer shall determine, but the
5latest stated maturity date shall not exceed estimated useful
6life of the projects being financed as stated in section 14.

7Section 14. Estimated useful life and term of debt.

8(a) Estimated useful life.--The General Assembly states that
9the estimated useful life of the public improvement projects
10itemized in this act is as follows:

11(1) Public improvement projects, 30 years.

12(2) Furniture and equipment projects, 10 years.

13(3) Transportation assistance projects:

14(i) Rolling stock, 15 years.

15(ii) Passenger buses, 12 years.

16(iii) Furniture and equipment, 10 years.

17(iv) All others, 30 years.

18(b) Term of debt.--The maximum term of the debt authorized
19to be incurred under this act is 30 years.

20Section 15. Appropriations.

21(a) Public improvements.--The net proceeds of the sale of
22the obligations authorized in this act are hereby appropriated
23from the Capital Facilities Fund to the Department of General
24Services in the maximum amount of $2,312,964,000 to be used by
25it exclusively to defray the financial cost of the public
26improvement projects specifically itemized in a capital budget.
27After reserving or paying the expenses of the sale of the
28obligation, the State Treasurer shall pay to the Department of
29General Services the moneys as required and certified by it to
30be legally due and payable.

1(b) Furniture and equipment.--The net proceeds of the sale
2of the obligations authorized in this act are hereby
3appropriated from the Capital Facilities Fund to the Department
4of General Services in the maximum amount of $104,300,000 to be
5used by it exclusively to defray the financial cost of the
6public improvement projects consisting of the acquisition of
7original movable furniture and equipment specifically itemized
8in a capital budget. After reserving or paying the expenses of
9the sale of the obligation, the State Treasurer shall pay to the
10Department of General Services the moneys as required and
11certified by it to be legally due and payable.

12(c) Transportation assistance.--The net proceeds of the sale
13of the obligations authorized in this act are hereby
14appropriated from the Capital Facilities Fund to the Department
15of Transportation in the maximum amount of $1,314,124,000 to be
16used by it exclusively to defray the financial cost of the
17transportation assistance projects specifically itemized in a
18capital budget. After reserving or paying the expenses of the
19sale of the obligation, the State Treasurer shall pay to the
20Department of Transportation the moneys as required and
21certified by it to be legally due and payable.

22(d) Redevelopment assistance.--The net proceeds of the sale
23of the obligations authorized in this act are hereby
24appropriated from the Capital Facilities Fund to the Department
25of Community and Economic Development in the maximum amount of
26$3,181,261,000 to be used by it exclusively to defray the
27financial cost of the redevelopment assistance capital projects
28specifically itemized in a capital budget. After reserving or
29paying the expenses of the sale of the obligation, the State
30Treasurer shall pay to the Department of Community and Economic

1Development the moneys as required and certified by it to be
2legally due and payable.

3(e) Flood control.--The net proceeds of the sale of the
4obligations authorized in this act are hereby appropriated from
5the Capital Facilities Fund to the Department of Environmental
6Protection in the maximum amount of $73,702,000 to be used by it
7exclusively to defray the financial cost of the flood control
8projects specifically itemized in a capital budget. After
9reserving or paying the expenses of the sale of the obligation,
10the State Treasurer shall pay to the Department of Environmental
11Protection the moneys as required and certified by it to be
12legally due and payable.

13Section 16. Federal funds.

14(a) Projects itemized in this act.--In addition to those
15funds appropriated in section 11, all moneys received from the
16Federal Government for the projects specifically itemized in
17this act are also hereby appropriated for those projects.

18(b) Projects not requiring itemization.--Department of
19Military and Veterans Affairs construction projects which are
20totally federally funded but which are to be administered by the
21Department of General Services are hereby authorized.

22Section 17. Editorial changes.

23In editing and preparing this act for printing following the
24final enactment, the Legislative Reference Bureau shall insert
25or revise letters or numbers for projects where the letters or
26numbers are missing or require revision. The bureau shall also
27revise the total monetary amounts for the total authorization,
28debt authorization, appropriations and departmental totals as
29necessary to agree with the total monetary amounts of the
30projects.

1Section 18. Effective date.