PRIOR PRINTER'S NO. 4042 | PRINTER'S NO. 4177 |
THE GENERAL ASSEMBLY OF PENNSYLVANIA
HOUSE BILL
No. | 2478 | Session of 2014 |
INTRODUCED BY ADOLPH, SEPTEMBER 15, 2014
AS RE-REPORTED FROM COMMITTEE ON APPROPRIATIONS, HOUSE OF REPRESENTATIVES, AS AMENDED, SEPTEMBER 23, 2014
AN ACT
1Providing for the capital budget for fiscal year 2014-2015;
2itemizing public improvement projects, furniture and
3equipment projects, transportation assistance projects,
4redevelopment assistance capital projects, flood control
5projects, Keystone Recreation, Park and Conservation Fund
6projects, Environmental Stewardship Fund projects <-and, State
7forestry bridge projects<-, Motor License Fund projects and
8Pennsylvania Fish and Boat Commission projects, to be
9constructed, acquired or assisted by the Department of
10General Services, the Department of Community and Economic
11Development, the Department of Conservation and Natural
12Resources, the Department of Environmental Protection or the
13Department of Transportation, <-the Pennsylvania Fish and Boat
14Commission, together with their estimated financial costs;
15authorizing the incurring of debt without the approval of the
16electors for the purpose of financing the projects to be
17constructed, acquired or assisted by the Department of
18General Services, the Department of Community and Economic
19Development, <-the Department of Conservation and Natural
20Resources, the Department of Environmental Protection <-or, the
21Department of Transportation<-; or the Pennsylvania Fish and
22Boat Commission; authorizing the use of current revenue for
23the purpose of financing the projects to be constructed,
24acquired or assisted by the Department of Conservation and
25Natural Resources or the Department of Transportation stating
26the estimated useful life of the projects; and providing for
27an exemption and for limitation on certain capital projects.
28The General Assembly of the Commonwealth of Pennsylvania
29hereby enacts as follows:
30Section 1. Short title.
1This act shall be known and may be cited as the Capital
2Budget Project Itemization Act of 2014-2015.
3Section 2. Total authorizations.
4(a) Public improvements.--The total authorization for the
5additional capital projects in the category of public
6improvement projects itemized in section 3 and to be acquired or
7constructed by the Department of General Services, its
8successors or assigns, and to be financed by the incurring of
9debt shall be $565,191,000 $949,966,000.<-
10(b) Furniture and equipment.--The total authorization for
11the additional capital projects in the category of public
12improvement projects consisting of the acquisition of original
13movable furniture and equipment to complete public improvement
14projects itemized in section 4 and to be acquired by the
15Department of General Services, its successors or assigns, and
16to be financed by the incurring of debt shall be $1,600,000<-
17$19,600,000.<-
18(c) Transportation assistance.--The total authorization for
19the capital projects in the category of transportation
20assistance projects itemized in section 5 with respect to which
21an interest is to be acquired in or constructed by the
22Department of Transportation, its successors or assigns, and to
23be financed by the incurring of debt shall be $451,893,000<-
24$554,771,000.<-
25(d) Redevelopment assistance.--The total authorization for
26the capital projects in the category of redevelopment assistance
27capital projects itemized in section 6 for capital grants by the
28Department of Community and Economic Development, its successors
29or assigns, and to be financed by the incurring of debt, shall
30be $787,027,000 $1,512,030,000<-.
1(e) Flood control.--The total authorization for the capital
2projects in the category of flood control projects itemized in
3section 7 and to be constructed by the Department of
4Environmental Protection, its successors or assigns, and to be
5financed by the incurring of debt, shall be $48,205,000<-
6$62,502,000.<-
7(f) Keystone Recreation, Park and Conservation Fund.--The
8total authorization for the capital projects in the category of
9public improvement projects itemized in section 8 and to be
10constructed by the Department of Conservation and Natural
11Resources, its successors or assigns, and to be financed from
12current revenues in the Keystone Recreation, Park and
13Conservation Fund shall be <-$20,015,000 $24,040,000.
14(g) Environmental Stewardship Fund current revenue
15projects.--The total authorization for the capital projects in
16the category of public improvement projects itemized in section
179 to be acquired or developed by the Department of Conservation
18and Natural Resources and to be financed by current revenues of
19the Environmental Stewardship Fund under executive authorization
20shall be $7,740,000 $13,840,000.<-
21(h) State forestry bridge projects.--The total authorization
22for the capital projects itemized in section 10 to be
23constructed by the Department of Conservation and Natural
24Resources, its successors or assigns, and to be financed by oil
25company franchise tax revenues under 75 Pa.C.S. § 9502(a)(2)(iv)
26(relating to imposition of tax) shall be $3,750,000 $9,060,000.<-
27(i) Motor License Fund current revenue projects.--The total
28authorization for the capital projects in the category of public
29improvement projects itemized in section 11 to be acquired or
30developed by the Department of Transportation and to be financed
1by current revenues of the Motor License Fund pursuant to
2executive authorization shall be $407,500,000.
<-3(j) Fish Fund and Boat Fund projects.--The total
4authorization for the capital projects in the category of public
5improvement projects itemized in section 11.1 to be acquired or
6developed by the Pennsylvania Fish and Boat Commission and to be
7financed by the incurring of debt or by current revenues of the
8Fish Fund and the Boat Fund pursuant to executive authorization
9shall be $15,093,000.
10Section 3. Itemization of public improvement capital projects.
11Additional capital projects in the category of public
12improvement projects to be constructed or acquired by the
13Department of General Services, its successors or assigns, and
14to be financed by the incurring of debt, are hereby itemized,
15together with their respective estimated financial costs, as
16follows:
18Project | Total Project Allocation | |||||
19(1) Department of Agriculture |
| |||||
20(i) Farm Show Complex |
| |||||
21(A) Provide for maintenance and upgrades |
| |||||
24Project Allocation | 14,000,000 | |||||
| ||||||
27(Design & Contingencies - $1,400,000) |
| |||||
| ||||||
<-30(i) Bald Eagle State Forest |
| |||||
1(A) Breach and remove Stony Run Dam |
| |||||
2Project Allocation | 3,000,000 | |||||
3(Base Project Allocation - $3,000,000) |
| |||||
4(ii) Cowans Gap State Park |
| |||||
| ||||||
7Project Allocation | 6,000,000 | |||||
8(Base Project Allocation - $6,000,000) |
| |||||
9(iii) Delaware Canal State Park |
| |||||
10(A) Rehabilitate the historic canal |
| |||||
13Project Allocation | 28,000,000 | |||||
| ||||||
| ||||||
18(A) Rebuild HaZLEton Air Operations |
| |||||
20Project Allocation | 3,000,000 | |||||
21(Base Project Allocation - $3,000,000) |
| |||||
22(v) Elk State Forest |
| |||||
23(A) Replace Brooks Run Forest Maintenance |
| |||||
25Project Allocation | 3,500,000 | |||||
26(Base Project Allocation - $3,500,000) |
| |||||
| ||||||
29Project Allocation | 3,000,000 | |||||
30(Base Project Allocation - $3,000,000) |
| |||||
1(vi) Lackawanna State Forest |
| |||||
2(A) Breach and remove Edgerton Dam |
| |||||
3Project Allocation | 2,500,000 | |||||
4(Base Project Allocation - $2,500,000) |
| |||||
5(vii) Michaux State Forest |
| |||||
6(A) Construct resource management center |
| |||||
8Project Allocation | 8,000,000 | |||||
9(Base Project Allocation - $8,000,000) |
| |||||
10(viii) Shikellamy State Park |
| |||||
| ||||||
13Project Allocation | 3,000,000 | |||||
14(Base Project Allocation - $3,000,000) |
| |||||
15(ix) Sproul State Forest |
| |||||
| ||||||
18Project Allocation | 3,000,000 | |||||
19(Base Project Allocation - $3,000,000) |
| |||||
20(x) Tiadaghton State Forest |
| |||||
21(A) Construct Hepburn Street Fishway |
| |||||
22Project Allocation | 10,000,000 | |||||
| ||||||
25(i) <-(xi) Washington Crossing Historic Park |
| |||||
26(A) Construction and infrastructure |
| |||||
29Project Allocation | 5,000,000 | |||||
30(Base Project Allocation - $5,000,000) |
| |||||
1(3) Department of Corrections |
| |||||
2(i) State Correctional Institution at Albion |
| |||||
3(A) Replace all institutional cameras and |
| |||||
5Project Allocation | 1,875,000 | |||||
6(Base Project Allocation - $1,500,000) |
| |||||
7(Design & Contingencies - $375,000) |
| |||||
8(B) Renovate or replace the institution's |
| |||||
12Project Allocation | 1,875,000 | |||||
13(Base Project Allocation - $1,500,000) |
| |||||
14(Design & Contingencies - $375,000) |
| |||||
| ||||||
17(A) Replace current fire alarm system |
| |||||
18Project Allocation | 1,250,000 | |||||
19(Base Project Allocation - $1,000,000) |
| |||||
20(Design & Contingencies - $250,000) |
| |||||
| ||||||
23(A) Install new gravity flow sewer lines |
| |||||
25Project Allocation | 931,000 | |||||
26(Base Project Allocation - $745,000) |
| |||||
27(Design & Contingencies - $186,000) |
| |||||
| ||||||
30Project Allocation | 12,750,000 | |||||
| ||||||
3(Design & Contingencies - $2,550,000) |
| |||||
4(iv) State Correctional Institution at Forest |
| |||||
| ||||||
7Project Allocation | 575,000 | |||||
8(Base Project Allocation - $460,000) |
| |||||
9(Design & Contingencies - $115,000) |
| |||||
| ||||||
12Project Allocation | 875,000 | |||||
13(Base Project Allocation - $700,000) |
| |||||
14(Design & Contingencies - $175,000) |
| |||||
15(v) State Correctional Institution at Muncy |
| |||||
16(A) Replace automatic temperature |
| |||||
20Project Allocation | 750,000 | |||||
21(Base Project Allocation - $600,000) |
| |||||
22(Design & Contingencies - $150,000) |
| |||||
23(B) Construct new diagnostic |
| |||||
28Project Allocation | 27,500,000 | |||||
| ||||||
1(Design & Contingencies - $5,500,000) |
| |||||
| ||||||
| ||||||
6Project Allocation | 475,000 | |||||
7(Base Project Allocation - $380,000) |
| |||||
8(Design & Contingencies - $95,000) |
| |||||
| ||||||
11(A) Replace HVAC system in C Block and |
| |||||
13Project Allocation | 3,750,000 | |||||
14(Base Project Allocation - $3,000,000) |
| |||||
15(Design & Contingencies - $750,000) |
| |||||
16(B) Replace HVAC system in Building No.1 |
| |||||
18Project Allocation | 2,500,000 | |||||
19(Base Project Allocation - $2,000,000) |
| |||||
20(Design & Contingencies - $500,000) |
| |||||
21(4) Department of Education |
| |||||
<-22(i) Community College of Allegheny County |
| |||||
23(A) Infrastructure, renovation and |
| |||||
27Project Allocation | 250,000 | |||||
28(Base Project Allocation - $250,000) |
| |||||
29(B) Construction, renovation and other |
| |||||
3Project Allocation | 11,300,000 | |||||
| ||||||
6(C) Construction, infrastructure, |
| |||||
13Project Allocation | 350,000 | |||||
14(Base Project Allocation - $350,000) |
| |||||
15(D) Construction, infrastructure, |
| |||||
22Project Allocation | 350,000 | |||||
23(Base Project Allocation - $350,000) |
| |||||
24(E) Construction, infrastructure, |
| |||||
30Project Allocation | 125,000 | |||||
1(Base Project Allocation - $125,000) |
| |||||
2(F) Construction, infrastructure, |
| |||||
7Project Allocation | 2,700,000 | |||||
8(Base Project Allocation - $2,700,000) |
| |||||
9(ii) Lehigh Carbon Community College |
| |||||
10(A) Construction and related costs to |
| |||||
13Project Allocation | 1,000,000 | |||||
14(Base Project Allocation - $1,000,000) |
| |||||
15(i) <-(iii) Lincoln University |
| |||||
16(A) Renovate the Manuel Rivero Gymnasium |
| |||||
17Project Allocation | 30,000,000 | |||||
| ||||||
20(Design & Contingencies - $6,000,000) |
| |||||
<-21(iv) Northampton Community College |
| |||||
22(A) Construction, infrastructure, |
| |||||
27Project Allocation | 1,400,000 | |||||
28(Base Project Allocation - $1,400,000) |
| |||||
29(B) Construction, infrastructure and |
| |||||
3Project Allocation | 1,000,000 | |||||
4(Base Project Allocation - $1,000,000) |
| |||||
5(C) Construction, infrastructure and |
| |||||
10Project Allocation | 2,000,000 | |||||
11(Base Project Allocation - $2,000,000) |
| |||||
12(D) Construction, infrastructure and |
| |||||
17Project Allocation | 1,300,000 | |||||
18(Base Project Allocation - $1,300,000) |
| |||||
19(ii) <-(v) The Pennsylvania State University |
| |||||
20(A) Rehabilitate the Hosler Building |
| |||||
21Project Allocation | 42,000,000 | |||||
| ||||||
24(Design & Contingencies - $7,000,000) |
| |||||
25(B) Construction, infrastructure, |
| |||||
1Project Allocation | 25,000,000 | |||||
| ||||||
4(C) Construction, acquisition, |
| |||||
11Project Allocation | 20,000,000 | |||||
| ||||||
14(iii) <-(vi) Temple University |
| |||||
15(A) Purchase the old William Penn High |
| |||||
17Project Allocation | 10,000,000 | |||||
18(Base Project Allocation - $5,000,000) |
| |||||
19(Land Allocation - $4,000,000) |
| |||||
20(Design & Contingencies - $1,000,000) |
| |||||
| ||||||
23(A) Expand the technology center to meet |
| |||||
25Project Allocation | 5,000,000 | |||||
26(Base Project Allocation - $4,400,000) |
| |||||
27(Design & Contingencies - $600,000) |
| |||||
28(v) <-(viii) University of Pittsburgh |
| |||||
29(A) Provide for continued maintenance and |
| |||||
1Project Allocation | 20,000,000 | |||||
| ||||||
4(Design & Contingencies - $4,000,000) |
| |||||
5(B) Construction, infrastructure, |
| |||||
8Project Allocation | 15,000,000 | |||||
| ||||||
11(C) Construction, infrastructure, |
| |||||
14Project Allocation | 20,000,000 | |||||
| ||||||
17(D) Construction, infrastructure, |
| |||||
20Project Allocation | 50,000,000 | |||||
| ||||||
23(E) Construction, infrastructure, |
| |||||
26Project Allocation | 20,000,000 | |||||
| ||||||
29(F) Construction, infrastructure, |
| |||||
3Project Allocation | 10,000,000 | |||||
| ||||||
6(G) Construction, infrastructure, |
| |||||
10Project Allocation | 25,000,000 | |||||
| ||||||
13(H) University of Pittsburgh, Bradford |
| |||||
16Project Allocation | 25,000,000 | |||||
| ||||||
19(5) Pennsylvania Emergency Management Agency |
| |||||
20(i) State Fire Academy |
| |||||
21(A) Expand <-Demolition and removal of |
| |||||
27Project Allocation<- | 5,000,000 | |||||
28(Base Project Allocation - $4,000,000) |
| |||||
<-29Project Allocation | 10,000,000 | |||||
30(Base Project Allocation - $9,000,000) |
| |||||
1(Land Allocation - $500,000) |
| |||||
2(Design & Contingencies - $500,000) |
| |||||
3(ii) Western Area office building |
| |||||
4(A) Demolish current facility and |
| |||||
7Project Allocation | 3,350,000 | |||||
8(Base Project Allocation - $3,000,000) |
| |||||
9(Design & Contingencies - $350,000) |
| |||||
10(6) Department of Environmental Protection |
| |||||
11(i) Bradford County |
| |||||
| ||||||
14Project Allocation | 1,875,000 | |||||
15(Base Project Allocation - $1,500,000) |
| |||||
16(Design & Contingencies - $375,000) |
| |||||
17(ii) Butler County |
| |||||
| ||||||
20Project Allocation | 3,125,000 | |||||
21(Base Project Allocation - $2,500,000) |
| |||||
22(Design & Contingencies - $625,000) |
| |||||
23(iii) Clearfield County |
| |||||
| ||||||
26Project Allocation | 3,125,000 | |||||
27(Base Project Allocation - $2,500,000) |
| |||||
28(Design & Contingencies - $625,000) |
| |||||
| ||||||
1Project Allocation | 1,875,000 | |||||
2(Base Project Allocation - $1,500,000) |
| |||||
3(Design & Contingencies - $375,000) |
| |||||
4(C) Provide additional funding for Orrs |
| |||||
6Project Allocation | 1,875,000 | |||||
7(Base Project Allocation - $1,500,000) |
| |||||
8(Design & Contingencies - $375,000) |
| |||||
9(iv) Lycoming County |
| |||||
10(A) Provide additional funding for |
| |||||
12Project Allocation | 6,250,000 | |||||
13(Base Project Allocation - $5,000,000) |
| |||||
14(Design & Contingencies - $1,250,000) |
| |||||
15(v) Luzerne County |
| |||||
| ||||||
18Project Allocation | 600,000 | |||||
19(Base Project Allocation - $500,000) |
| |||||
20(Design & Contingencies - $100,000) |
| |||||
21(B) Provide flood protection for the town |
| |||||
25Project Allocation | 4,000,000 | |||||
26(Base Project Allocation - $3,200,000) |
| |||||
27(Design & Contingencies - $800,000) |
| |||||
28(vi) McKean County |
| |||||
| ||||||
1Project Allocation | 6,875,000 | |||||
2(Base Project Allocation - $5,500,000) |
| |||||
3(Design & Contingencies - $1,375,000) |
| |||||
4(vii) Northumberland County |
| |||||
| ||||||
7Project Allocation | 1,875,000 | |||||
8(Base Project Allocation - $1,500,000) |
| |||||
9(Design & Contingencies - $375,000) |
| |||||
10(viii) Tioga County |
| |||||
11(A) Provide additional funding for Camp |
| |||||
13Project Allocation | 6,250,000 | |||||
14(Base Project Allocation - $5,000,000) |
| |||||
15(Design & Contingencies - $1,250,000) |
| |||||
16(7) Department of General Services |
| |||||
17(i) Dauphin County |
| |||||
18(A) Provide additional funding for DGS |
| |||||
21Project Allocation | 5,000,000 | |||||
22(Base Project Allocation - $4,000,000) |
| |||||
23(Design & Contingencies - $1,000,000) |
| |||||
24(B) Repair spalling concrete tunnel |
| |||||
29Project Allocation | 2,200,000 | |||||
30(Base Project Allocation - $2,000,000) |
| |||||
1(Design & Contingencies - $200,000) |
| |||||
2(C) Replace existing interior lighting |
| |||||
5Project Allocation | 385,000 | |||||
6(Base Project Allocation - $350,000) |
| |||||
7(Design & Contingencies - $35,000) |
| |||||
8(D) Replace four generators located at |
| |||||
11Project Allocation | 2,200,000 | |||||
12(Base Project Allocation - $2,000,000) |
| |||||
13(Design & Contingencies - $200,000) |
| |||||
| ||||||
16Project Allocation | 650,000 | |||||
17(Base Project Allocation - $550,000) |
| |||||
18(Design & Contingencies - $100,000) |
| |||||
| ||||||
21Project Allocation | 4,000,000 | |||||
22(Base Project Allocation - $4,000,000) |
| |||||
| ||||||
25Project Allocation | 2,000,000 | |||||
26(Base Project Allocation - $2,000,000) |
| |||||
| ||||||
29Project Allocation | 2,000,000 | |||||
30(Base Project Allocation - $2,000,000) |
| |||||
| ||||||
3Project Allocation | 2,000,000 | |||||
4(Base Project Allocation - $2,000,000) |
| |||||
<-5(J) Additional funding to renovate |
| |||||
8Project Allocation | 1,200,000 | |||||
9(Base Project Allocation - $1,200,000) |
| |||||
10(K) Additional funding to renovate |
| |||||
13Project Allocation | 1,200,000 | |||||
14(Base Project Allocation - $1,200,000) |
| |||||
| ||||||
17(i) State Archives Building |
| |||||
18(A) Acquire and renovate off-site |
| |||||
20Project Allocation | 30,000,000 | |||||
| ||||||
23(9) Department of Military and Veterans Affairs |
| |||||
| ||||||
26(A) Additional funding to rehabilitate |
| |||||
30Project Allocation | 4,000,000 | |||||
1(Base Project Allocation - $4,000,000) |
| |||||
2(i) <-(ii) Berks Readiness Center, Berks County |
| |||||
3(A) Provide for acquisition of land for |
| |||||
5Project Allocation | 2,000,000 | |||||
6(Land Allocation - $2,000,000) |
| |||||
| ||||||
9(A) Additional funding to rehabilitate |
| |||||
13Project Allocation | 4,000,000 | |||||
14(Base Project Allocation - $4,000,000) |
| |||||
| ||||||
17(A) Provide for acquisition of land for |
| |||||
19Project Allocation | 3,500,000 | |||||
20(Land Allocation - $3,500,000) |
| |||||
| ||||||
23(A) Additional funding to rehabilitate |
| |||||
27Project Allocation | 4,000,000 | |||||
28(Base Project Allocation - $4,000,000) |
| |||||
29(vi) Pennsylvania Soldiers' and Sailors' |
| |||||
1(A) Additional funding to rehabilitate |
| |||||
5Project Allocation | 4,000,000 | |||||
6(Base Project Allocation - $4,000,000) |
| |||||
| ||||||
9(A) Additional funding to rehabilitate |
| |||||
13Project Allocation | 4,000,000 | |||||
14(Base Project Allocation - $4,000,000) |
| |||||
15(viii) Pennsylvania Veterans Memorial - Fort |
| |||||
18(A) Rehabilitate the Pennsylvania |
| |||||
21Project Allocation | 3,600,000 | |||||
22(Base Project Allocation - $3,600,000) |
| |||||
23(ix) Susquehanna Valley Community Education |
| |||||
25(A) Construction, infrastructure, |
| |||||
30Project Allocation | 1,500,000 | |||||
1(Base Project Allocation - $1,500,000) |
| |||||
| ||||||
4(A) Additional funding to rehabilitate |
| |||||
8Project Allocation | 4,000,000 | |||||
9(Base Project Allocation - $4,000,000) |
| |||||
10(iii) <-(xi) Eastern Central Readiness Center, |
| |||||
12(A) Provide for acquisition of land for |
| |||||
15Project Allocation | 2,000,000 | |||||
16(Land Allocation - $2,000,000) |
| |||||
17(iv) <-(xii) East North East Readiness Center, |
| |||||
19(A) Provide for acquisition of land for |
| |||||
22Project Allocation | 3,000,000 | |||||
23(Land Allocation - $3,000,000) |
| |||||
24(v) <-(xiii) Northeastern Readiness Center, |
| |||||
26(A) Provide for acquisition of land for |
| |||||
30Project Allocation | 2,000,000 | |||||
1(Land Allocation - $2,000,000) |
| |||||
| ||||||
4(A) Provide for acquisition of land for |
| |||||
8Project Allocation | 2,000,000 | |||||
9(Land Allocation - $2,000,000) |
| |||||
10(vii) <-(xv) West Northwest Readiness Center, |
| |||||
12(A) Provide for acquisition of land for |
| |||||
15Project Allocation | 2,000,000 | |||||
16(Land Allocation - $2,000,000) |
| |||||
17(10) Department of Public Welfare |
| |||||
18(i) Clarks Summit State Hospital |
| |||||
19(A) Install new water line from |
| |||||
22Project Allocation | 1,800,000 | |||||
23(Base Project Allocation - $1,440,000) |
| |||||
24(Design & Contingencies - $360,000) |
| |||||
| ||||||
27Project Allocation | 5,000,000 | |||||
28(Base Project Allocation - $4,000,000) |
| |||||
29(Design & Contingencies - $1,000,000) |
| |||||
30(ii) Ebensburg Center |
| |||||
| ||||||
3Project Allocation | 1,500,000 | |||||
4(Base Project Allocation - $1,200,000) |
| |||||
5(Design & Contingencies - $300,000) |
| |||||
6(B) Install automatic electrical main |
| |||||
9Project Allocation | 2,000,000 | |||||
10(Base Project Allocation - $1,600,000) |
| |||||
11(Design & Contingencies - $400,000) |
| |||||
12(iii) Loysville Youth Development Center |
| |||||
13(A) Replace existing fixtures and shutoff |
| |||||
16Project Allocation | 700,000 | |||||
17(Base Project Allocation - $560,000) |
| |||||
18(Design & Contingencies - $140,000) |
| |||||
19(iv) North Central Secure Treatment Unit |
| |||||
20(A) Replace flat rubber roof at facility |
| |||||
21Project Allocation | 500,000 | |||||
22(Base Project Allocation - $400,000) |
| |||||
23(Design & Contingencies - $100,000) |
| |||||
24(v) Polk Center |
| |||||
25(A) Replace elevators and controls in |
| |||||
27Project Allocation | 800,000 | |||||
28(Base Project Allocation - $640,000) |
| |||||
29(Design & Contingencies - $160,000) |
| |||||
30(vi) Selinsgrove Center |
| |||||
| ||||||
3Project Allocation | 500,000 | |||||
4(Base Project Allocation - $400,000) |
| |||||
5(Design & Contingencies - $100,000) |
| |||||
6(vii) South Mountain Secure Treatment Unit |
| |||||
7(A) Refurbish existing gymnasium shell, |
| |||||
9Project Allocation | 500,000 | |||||
10(Base Project Allocation - $400,000) |
| |||||
11(Design & Contingencies - $100,000) |
| |||||
12(B) Replace current electrical |
| |||||
15Project Allocation | 4,000,000 | |||||
16(Base Project Allocation - $3,200,000) |
| |||||
17(Design & Contingencies - $800,000) |
| |||||
18(viii) Torrance State Hospital |
| |||||
19(A) Replace water filtration system and |
| |||||
21Project Allocation | 6,000,000 | |||||
22(Base Project Allocation - $4,800,000) |
| |||||
23(Design & Contingencies - $1,200,000) |
| |||||
24(ix) Warren State Hospital |
| |||||
25(A) Install HVAC |
| |||||
26Project Allocation | 6,000,000 | |||||
27(Base Project Allocation - $4,800,000) |
| |||||
28(Design & Contingencies - $1,200,000) |
| |||||
29(x) Wernersville State Hospital |
| |||||
30(A) Replace roofs on various buildings |
| |||||
1Project Allocation | 2,500,000 | |||||
2(Base Project Allocation - $2,000,000) |
| |||||
3(Design & Contingencies - $500,000) |
| |||||
4(xi) White Haven Center |
| |||||
5(A) Replace single-pane windows with |
| |||||
8Project Allocation | 2,500,000 | |||||
9(Base Project Allocation - $2,000,000) |
| |||||
10(Design & Contingencies - $500,000) |
| |||||
11(11) Pennsylvania State Police |
| |||||
12(i) Reading Headquarters, Berks County |
| |||||
| ||||||
15Project Allocation | 11,450,000 | |||||
16(Base Project Allocation - $8,500,000) |
| |||||
17(Land Allocation - $1,000,000) |
| |||||
18(Design & Contingencies - $1,950,000) |
| |||||
19(ii) Lancaster Headquarters, Lancaster County |
| |||||
| ||||||
22Project Allocation | 15,325,000 | |||||
| ||||||
25(Land Allocation - $1,000,000) |
| |||||
26(Design & Contingencies - $2,100,000) |
| |||||
<-27(12) State System of Higher Education |
| |||||
28(i) Bloomsburg University |
| |||||
29(A) Renovate and provide additional funds |
| |||||
1Project Allocation | 2,500,000 | |||||
2(Base Project Allocation - $2,500,000) |
| |||||
3(ii) California University |
| |||||
4(A) Construct and provide additional |
| |||||
6Project Allocation | 45,000,000 | |||||
| ||||||
9(B) Renovate Morgan Hall |
| |||||
10Project Allocation | 15,000,000 | |||||
| ||||||
13(iii) Edinboro University |
| |||||
| ||||||
16Project Allocation | 30,000,000 | |||||
| ||||||
19(iv) Indiana University |
| |||||
20(A) Demolish Foster Hall |
| |||||
21Project Allocation | 3,000,000 | |||||
22(Base Project Allocation - $3,000,000) |
| |||||
23(v) Lock Haven University |
| |||||
24(A) Renovate Robinson Learning Center |
| |||||
25Project Allocation | 20,000,000 | |||||
| ||||||
28(B) Renovate Stevenson Library |
| |||||
29Project Allocation | 25,000,000 | |||||
30(Base Project Allocation -
1$25,000,000) |
| |||||
2(vi) Millersville University |
| |||||
3(A) Construct new academic building |
| |||||
4Project Allocation | 25,000,000 | |||||
| ||||||
7(vii) Shippensburg University |
| |||||
8(A) Renovate and provide additional funds |
| |||||
10Project Allocation | 35,000,000 | |||||
| ||||||
13(viii) Slippery Rock University |
| |||||
14(A) Renovate and provide additional funds |
| |||||
16Project Allocation | 3,000,000 | |||||
17(Base Project Allocation - $3,000,000) |
| |||||
| ||||||
20Project Allocation | 15,000,000 | |||||
| ||||||
23(ix) West Chester University |
| |||||
24(A) Renovate and provide additional funds |
| |||||
26Project Allocation | 20,000,000 | |||||
| ||||||
29(B) Construct and provide additional
1Facility |
| |||||
2Project Allocation | 15,000,000 | |||||
|
5Section 4. Itemization of furniture and equipment projects.
6Additional capital projects in the category of public
7improvement projects consisting of the acquisition of movable
8furniture and equipment to complete public improvement projects
9and to be purchased by the Department of General Services, its
10successors or assigns, and to be financed by the incurring of
11debt are hereby itemized, together with their estimated
12financial cost, as follows:
14Project | Total Project Allocation |
15(1) Department of Education |
|
16(i) University of Pittsburgh |
|
17(A) Provide original furniture and |
|
20Project Allocation | 1,600,000 |
21(Base Project Allocation - $1,600,000) |
|
<-22(2) State System of Higher Education |
|
23(i) Edinboro University |
|
24(A) Provide original furniture and |
|
27Project Allocation | 2,000,000 |
28(Base Project Allocation - $2,000,000) |
|
29(ii) Kutztown University |
|
30(A) Provide original furniture and |
|
3Project Allocation | 1,000,000 |
4(Base Project Allocation - $1,000,000) |
|
5(iii) Shippensburg University |
|
6(A) Provide original furniture and |
|
9Project Allocation | 9,000,000 |
10(Base Project Allocation - $9,000,000) |
|
11(iv) Slippery Rock University |
|
12(A) Provide original furniture and |
|
15Project Allocation | 2,000,000 |
16(Base Project Allocation - $2,000,000) |
|
17(v) West Chester University |
|
18(A) Provide original furniture and |
|
21Project Allocation | 4,000,000 |
22(Base Project Allocation - $4,000,000) |
|
23Section 5. Itemization of transportation assistance projects.
24(a) Mass transit.--Additional capital projects in the
25category of transportation assistance projects for mass transit
26in which an interest is to be acquired or constructed by the
27Department of Transportation, its successors or assigns, and to
28be financed by the incurring of debt are hereby itemized,
29together with their estimated financial costs, as follows:
1Project | Total Project
Allocation | |||||
2(1) Beaver County Transportation Authority |
| |||||
3(A) Construct CNG fueling station and |
| |||||
5Project Allocation | 574,000 | |||||
6(Base Project Allocation - $517,000) |
| |||||
7(Design & Contingencies - $57,000) |
| |||||
8(2) Berks Area Reading Transportation Authority |
| |||||
| ||||||
11Project Allocation | 850,000 | |||||
12(Base Project Allocation - $850,000) |
| |||||
13(3) Butler Transit Authority |
| |||||
| ||||||
16Project Allocation | 779,000 | |||||
17(Base Project Allocation - $779,000) |
| |||||
18(4) Cambria County Transit Authority |
| |||||
19(A) Rehabilitate facilities and other |
| |||||
21Project Allocation | 581,000 | |||||
22(Base Project Allocation - $523,000) |
| |||||
23(Design & Contingencies - $58,000) |
| |||||
24(5) Centre Area Transportation Authority |
| |||||
| ||||||
27Project Allocation | 1,379,000 | |||||
28(Base Project Allocation - $1,379,000) |
| |||||
29(6) County of Lackawanna Transit System |
| |||||
30(A) Replace buses that have exceeded
1their useful life |
| |||||
2Project Allocation | 726,000 | |||||
3(Base Project Allocation - $726,000) |
| |||||
4(7) Hazleton Public Transit |
| |||||
| ||||||
7Project Allocation | 87,000 | |||||
8(Base Project Allocation - $87,000) |
| |||||
9(8) Leigh <-Lehigh and Northampton Transportation |
| |||||
11(A) Acquisition and other related costs |
| |||||
13Project Allocation | 698,000 | |||||
14(Base Project Allocation - $698,000) |
| |||||
15(B) Acquisition and other related costs |
| |||||
17Project Allocation | 281,000 | |||||
18(Base Project Allocation - $281,000) |
| |||||
<-19(9) Lycoming County |
| |||||
| ||||||
22Project Allocation | 3,500,000 | |||||
23(Base Project Allocation - $3,500,000) |
| |||||
24(9) <-(10) Mid Mon Valley |
| |||||
| ||||||
27Project Allocation | 395,000 | |||||
28(Base Project Allocation - $395,000) |
| |||||
29(10) <-(11) Monroe County Transit Authority |
| |||||
30(A) Design and construct park and ride
1lot for MCTA customers |
| |||||
2Project Allocation | 387,000 | |||||
3(Base Project Allocation - $348,000) |
| |||||
4(Design & Contingencies - $39,000) |
| |||||
| ||||||
7Project Allocation | 581,000 | |||||
8(Base Project Allocation - $523,000) |
| |||||
9(Design & Contingencies - $58,000) |
| |||||
10(11) <-(12) Port Authority of Allegheny County |
| |||||
11(A) Expand bus system, including |
| |||||
15Project Allocation | 49,582,000 | |||||
| ||||||
18(Design & Contingencies - $4,958,000) |
| |||||
19(B) Replace major components of bus and |
| |||||
22Project Allocation | 4,723,000 | |||||
23(Base Project Allocation - $4,251,000) |
| |||||
24(Design & Contingencies - $472,000) |
| |||||
25(C) Replace buses and rehabilitate |
| |||||
29Project Allocation | 697,000 | |||||
30(Base Project Allocation - $627,000) |
| |||||
1(Design & Contingencies - $70,000) |
| |||||
2(D) Rehabilitate or replace existing |
| |||||
5Project Allocation | 6,484,000 | |||||
6(Base Project Allocation - $5,836,000) |
| |||||
7(Design & Contingencies - $648,000) |
| |||||
8(E) Purchase 70 replacement buses as part |
| |||||
10Project Allocation | 1,836,000 | |||||
11(Base Project Allocation - $1,652,000) |
| |||||
12(Design & Contingencies - $184,000) |
| |||||
13(F) Provide for capital improvements to |
| |||||
17Project Allocation | 14,516,000 | |||||
| ||||||
20(Design & Contingencies - $1,452,000) |
| |||||
21(G) Provide for overhaul of rolling stock |
| |||||
23Project Allocation | 3,387,000 | |||||
24(Base Project Allocation - $3,048,000) |
| |||||
25(Design & Contingencies - $339,000) |
| |||||
<-26(H) Construction, infrastructure, |
| |||||
29Project Allocation | 3,867,000 | |||||
30(Base Project Allocation - $3,867,000) |
| |||||
1(12) <-(13) River Valley Transit |
| |||||
| ||||||
4Project Allocation | 968,000 | |||||
5(Base Project Allocation - $871,000) |
| |||||
6(Design & Contingencies - $97,000) |
| |||||
7(B) Construct CNG fueling station and |
| |||||
10Project Allocation | 731,000 | |||||
11(Base Project Allocation - $658,000) |
| |||||
12(Design & Contingencies - $73,000) |
| |||||
| ||||||
15Project Allocation | 484,000 | |||||
16(Base Project Allocation - $484,000) |
| |||||
17(13) <-(14) Schuylkill Transportation System |
| |||||
18(A) Expand existing facility to |
| |||||
20Project Allocation | 581,000 | |||||
21(Base Project Allocation - $523,000) |
| |||||
22(Design & Contingencies - $58,000) |
| |||||
23(14) <-(15) Southeastern Pennsylvania |
| |||||
25(A) Replace buses and rehabilitate |
| |||||
28Project Allocation | 47,613,000 | |||||
| ||||||
1(Design & Contingencies - $4,761,000) |
| |||||
2(B) Rehabilitate or replace various |
| |||||
5Project Allocation | 51,097,000 | |||||
| ||||||
8(Design & Contingencies - $5,110,000) |
| |||||
9(C) Replace buses and rehabilitate |
| |||||
13Project Allocation | 3,484,000 | |||||
14(Base Project Allocation - $3,136,000) |
| |||||
15(Design & Contingencies - $348,000) |
| |||||
16(D) Repair or rehabilitate various |
| |||||
19Project Allocation | 8,266,000 | |||||
20(Base Project Allocation - $7,439,000) |
| |||||
21(Design & Contingencies - $827,000) |
| |||||
22(E) Rehabilitate or replace existing |
| |||||
25Project Allocation | 5,807,000 | |||||
26(Base Project Allocation - $5,226,000) |
| |||||
27(Design & Contingencies - $581,000) |
| |||||
28(F) Restore transit and railroad
1Infrastructure Safety Renewal Program |
| |||||
2Project Allocation | 69,678,000 | |||||
| ||||||
5(Design & Contingencies - $6,968,000) |
| |||||
6(G) Rehabilitate or replace various |
| |||||
9Project Allocation | 19,356,000 | |||||
| ||||||
12(Design & Contingencies - $1,936,000) |
| |||||
13(H) Replace existing assets as part of |
| |||||
15Project Allocation | 55,162,000 | |||||
| ||||||
18(Design & Contingencies - $5,516,000) |
| |||||
| ||||||
21(A) Purchase property and construct park |
| |||||
23Project Allocation | 581,000 | |||||
24(Land Allocation - $145,000) |
| |||||
25(Design & Contingencies - $436,000) |
| |||||
26(16) <-(17) York Adams Transportation Authority |
| |||||
27(A) Replacement of rolling stock |
| |||||
28Project Allocation | 892,000 | |||||
29(Base Project Allocation - $892,000) |
|
30(b) Rural and intercity rail.--Additional capital projects
1in the category of transportation assistance projects for rural
2and intercity rail service projects to be constructed or with
3respect to which an interest is to be acquired by the Department
4of Transportation, its successors or assigns and to be financed
5by the incurring of debt are hereby itemized, together with
6their respective estimated financial costs, as follows:
8Project | Total Project Allocation |
9(1) Dauphin County | <- | |||||
10(1) Allegheny County | <- | |||||
11(i) City of Pittsburgh |
| |||||
12(A) Acquisition, construction, |
| |||||
18Project Allocation | 20,000,000 | |||||
| ||||||
21(ii) Dormont Borough |
| |||||
22(A) Construction, infrastructure, |
| |||||
26Project Allocation | 12,000,000 | |||||
| ||||||
29(iii) Wimerding Borough |
| |||||
30(A) Acquisition, construction,
1infrastructure, redevelopment, |
| |||||
6Project Allocation | 20,000,000 | |||||
| ||||||
9(2) Beaver County |
| |||||
10(i) Ambridge Borough |
| |||||
11(A) Acquisition, construction, |
| |||||
17Project Allocation | 10,000,000 | |||||
| ||||||
20(3) Blair County |
| |||||
21(i) Everett Railroad Company |
| |||||
22(A) Rehabilitate rail infrastructure, |
| |||||
26Project Allocation | 1,500,000 | |||||
27(Base Project Allocation - $1,500,000) |
| |||||
28(4) Bradford County |
| |||||
29(i) Wyalusing Borough |
| |||||
30(A) Construct a rail transload and
1material storage facility, including |
| |||||
8Project Allocation | 1,800,000 | |||||
9(Base Project Allocation - $1,800,000) |
| |||||
10(5) Chester County |
| |||||
11(i) Brandywine Valley Railroad |
| |||||
12(A) Repair bridges, rehabilitate rail |
| |||||
19Project Allocation | 2,500,000 | |||||
20(Base Project Allocation - $2,500,000) |
| |||||
21(6) Clinton County |
| |||||
22(i) City of Lock Haven |
| |||||
23(A) Construction, renovation and other |
| |||||
27Project Allocation | 1,540,000 | |||||
28(Base Project Allocation - $1,540,000) |
| |||||
29(7) Dauphin County |
| |||||
30(i) Swatara Township |
| |||||
1(A) Acquisition, construction, |
| |||||
7Project Allocation | 50,000,000 | |||||
| ||||||
<-10(8) Fayette County |
| |||||
11(i) County projects |
| |||||
12(A) Rehabilitate, reconfigure existing |
| |||||
19Project Allocation | 2,800,000 | |||||
20(Base Project Allocation - $2,800,000) |
| |||||
21(2) <-(9) Lawrence County |
| |||||
22(i) Bessemer and Mahoning Boroughs <-Borough |
| |||||
24(A) Construction, acquisition, |
| |||||
30Project Allocation | 10,000,000 | |||||
| ||||||
3(ii) Ellwood City Borough |
| |||||
4(A) Construction, infrastructure, |
| |||||
7Project Allocation | 500,000 | |||||
8(Base Project Allocation - $500,000) |
| |||||
9(iii) City of New Castle |
| |||||
10(A) Construction, acquisition, |
| |||||
16Project Allocation | 5,000,000 | |||||
17(Base Project Allocation - $5,000,000) |
| |||||
18(iv) Neshannock Township |
| |||||
19(A) Construction, acquisition, |
| |||||
23Project Allocation | 15,000,000 | |||||
| ||||||
26(v) New Beaver Borough |
| |||||
27(A) Construction, acquisition,
1related costs for the installation of |
| |||||
4Project Allocation | 3,000,000 | |||||
5(Base Project Allocation - $3,000,000) |
| |||||
<-6(10) Luzerne County |
| |||||
7(i) County projects |
| |||||
8(A) Extend rail service to recycling |
| |||||
16Project Allocation | 1,000,000 | |||||
17(Base Project Allocation - $1,000,000) |
| |||||
18(3) <-(11) Mercer County |
| |||||
19(i) City of Farrell |
| |||||
20(A) Construction, infrastructure, |
| |||||
24Project Allocation | 3,500,000 | |||||
25(Base Project Allocation - $3,500,000) |
| |||||
26(ii) City of Sharon |
| |||||
27(A) Construction, infrastructure, |
| |||||
30Project Allocation | 1,050,000 | |||||
1(Base Project Allocation - $1,050,000) |
| |||||
2(iii) Sharpsville Borough |
| |||||
3(A) Construction, infrastructure and |
| |||||
6Project Allocation | 7,000,000 | |||||
7(Base Project Allocation - $7,000,000) |
| |||||
8(4) <-(12) Monroe County |
| |||||
9(i) East Stroudsburg Borough |
| |||||
10(A) Construction and related costs for |
| |||||
12Project Allocation | 1,200,000 | |||||
13(Base Project Allocation - $1,200,000) |
| |||||
<-14(13) Montgomery County |
| |||||
15(i) Upper Merion and Plymouth Railroad |
| |||||
16(A) Construct new storage tracks, |
| |||||
25Project Allocation | 2,000,000 | |||||
26(Base Project Allocation - $2,000,000) |
| |||||
27(14) Northumberland County |
| |||||
28(i) Boyd Station, LLC |
| |||||
29(A) Expand existing infrastructure to
1processing of agricultural commodities |
| |||||
8Project Allocation | 4,000,000 | |||||
9(Base Project Allocation - $4,000,000) |
| |||||
10(15) SEDA-COG Joint Rail Authority |
| |||||
| ||||||
13(A) Upgrade 22 railroad bridges in |
| |||||
16Project Allocation | 1,911,000 | |||||
17(Base Project Allocation - $1,911,000) |
| |||||
18(ii) Columbia County |
| |||||
19(A) Reconstruct railroad roadbed and |
| |||||
23Project Allocation | 1,470,000 | |||||
24(Base Project Allocation - $1,470,000) |
| |||||
25(iii) Lycoming County |
| |||||
26(A) Purchase industrial property in |
| |||||
30Project Allocation | 1,750,000 | |||||
1(Base Project Allocation - $1,750,000) |
| |||||
2(iv) Mifflin County |
| |||||
3(A) Rehabilitate and construct yard |
| |||||
6Project Allocation | 1,750,000 | |||||
7(Base Project Allocation - $1,750,000) |
| |||||
8(B) Reconstruct railroad roadbed and |
| |||||
12Project Allocation | 1,050,000 | |||||
13(Base Project Allocation - $1,050,000) |
| |||||
14(16) York County |
| |||||
15(i) City of York |
| |||||
16(A) Acquisition, construction, |
| |||||
20Project Allocation | 3,500,000 | |||||
21(Base Project Allocation - $3,500,000) |
| |||||
22(17) Multiple Counties |
| |||||
23(i) Blair, Centre, Clinton, Columbia, |
| |||||
26(A) Construction, renovation and other |
| |||||
30Project Allocation | 1,900,000 | |||||
1(Base Project Allocation - $1,900,000) |
| |||||
| ||||||
4(A) Construction, renovation and other |
| |||||
8Project Allocation | 2,340,000 | |||||
9(Base Project Allocation - $2,340,000) |
|
10(c) Air transportation.--Additional capital projects in the
11category of transportation assistance projects for air
12transportation service to which an interest is to be acquired by
13the Department of Transportation, its successors or assigns and
14to be financed by the incurring of debt are hereby itemized,
15together with their respective estimated financial costs, as
16follows:
18Project | Total Project Allocation |
19(1) Adams County |
| |||||
20(i) Cumberland Township |
| |||||
21(A) Rehabilitation of existing aviation |
| |||||
26Project Allocation | 700,000 | |||||
27(Base Project Allocation - $700,000) |
| |||||
28(2) Dauphin County |
| |||||
| ||||||
1(A) Rehabilitation of existing aviation |
| |||||
7Project Allocation | 1,000,000 | |||||
8(Base Project Allocation - $1,000,000) |
| |||||
<-9(3) Franklin County |
| |||||
| ||||||
12(A) Rehabilitation of existing aviation |
| |||||
17Project Allocation | 700,000 | |||||
18(Base Project Allocation - $700,000) |
| |||||
19(3) <-(4) York County |
| |||||
| ||||||
22(A) Rehabilitation of existing aviation |
| |||||
26Project Allocation | 700,000 | |||||
27(Base Project Allocation - $700,000) |
|
28Section 6. Itemization of redevelopment assistance projects.
29(a) Additional capital projects in the category of
30redevelopment assistance projects for capital grants by the
1Department of Community and Economic Development, its successors
2or assigns, authorized under the provisions of the act of May
320, 1949 (P.L.1633, No.493), known as the Housing and
4Redevelopment Assistance Law, and redevelopment assistance
5capital projects and to be financed by the incurring of debt,
6are hereby itemized, together with their estimated financial
7costs, as follows:
9Project | Total Project Allocation | |||||
10(1) Adams County |
| |||||
11(i) County projects (Reserved) | <- | |||||
12(A) Infrastructure, construction,<- |
| |||||
16Project Allocation | 4,000,000 | |||||
17(Base Project Allocation - $4,000,000) |
| |||||
18(ii) Cumberland Township |
| |||||
19(A) Construction, infrastructure, |
| |||||
23Project Allocation | 5,000,000 | |||||
24(Base Project Allocation - $5,000,000) |
| |||||
25(2) Allegheny County |
| |||||
26(i) County projects (Reserved) | <- | |||||
27(A) Construction, infrastructure,<-
1Sewickley Township and Ohio Borough |
| |||||
2Project Allocation | 1,000,000 | |||||
3(Base Project Allocation - $1,000,000) |
| |||||
4(ii) City of Pittsburgh |
| |||||
5(A) Construction, infrastructure, |
| |||||
8Project Allocation | 20,000,000 | |||||
| ||||||
11(B) Construction, infrastructure, |
| |||||
15Project Allocation | 2,600,000 | |||||
16(Base Project Allocation - $2,600,000) |
| |||||
17(C) Construction, acquisition, |
| |||||
21Project Allocation | 20,000,000 | |||||
| ||||||
24(D) Construction, acquisition, |
| |||||
27Project Allocation | 5,500,000 | |||||
28(Base Project Allocation - $5,500,000) |
| |||||
29(E) Construction, infrastructure, |
| |||||
3Project Allocation | 1,000,000 | |||||
4(Base Project Allocation - $1,000,000) |
| |||||
5(F) Construction, infrastructure, |
| |||||
9Project Allocation | 1,000,000 | |||||
10(Base Project Allocation - $1,000,000) |
| |||||
11(G) Construction, infrastructure, |
| |||||
15Project Allocation | 7,000,000 | |||||
16(Base Project Allocation - $7,000,000) |
| |||||
17(H) Construction, acquisition, |
| |||||
21Project Allocation | 2,500,000 | |||||
22(Base Project Allocation - $2,500,000) |
| |||||
23(I) Construction, redevelopment, |
| |||||
27Project Allocation | 10,000,000 | |||||
| ||||||
<-30(J) Acquisition, construction,
1infrastructure, redevelopment, |
| |||||
6Project Allocation | 2,000,000 | |||||
7(Base Project Allocation - $2,000,000) |
| |||||
8(K) Acquisition, construction, |
| |||||
15Project Allocation | 20,000,000 | |||||
| ||||||
18(L) Acquisition, construction, |
| |||||
23Project Allocation | 15,000,000 | |||||
| ||||||
26(iii) Green Tree Borough |
| |||||
27(A) Construction, infrastructure, |
| |||||
30Project Allocation | 1,000,000 | |||||
1(Base Project Allocation - $1,000,000) |
| |||||
2(iii) <-(iv) Monroeville Borough |
| |||||
3(A) Acquisition, infrastructure, |
| |||||
6Project Allocation | 550,000 | |||||
7(Base Project Allocation - $550,000) |
| |||||
8(iv) <-(v) O'Hara Township |
| |||||
9(A) Construction, infrastructure and |
| |||||
12Project Allocation | 1,000,000 | |||||
13(Base Project Allocation - $1,000,000) |
| |||||
<-14(vi) Sewickley Borough |
| |||||
15(A) Construction, land acquisition, |
| |||||
19Project Allocation | 3,000,000 | |||||
20(Base Project Allocation - $3,000,000) |
| |||||
21(vii) Wimerding Borough |
| |||||
22(A) Acquisition, construction, |
| |||||
29Project Allocation | 20,000,000 | |||||
30(Base Project Allocation -
1$20,000,000) |
| |||||
2(3) Armstrong County (Reserved) |
| |||||
3(4) Beaver County |
| |||||
4(i) County projects |
| |||||
5(A) Acquisition, construction, |
| |||||
10Project Allocation | 6,000,000 | |||||
11(Base Project Allocation - $6,000,000) |
| |||||
12(B) Acquisition, construction, |
| |||||
19Project Allocation | 5,000,000 | |||||
20(Base Project Allocation - $5,000,000) |
| |||||
21(C) Acquisition, construction, |
| |||||
26Project Allocation | 7,500,000 | |||||
27(Base Project Allocation - $7,500,000) |
| |||||
28(ii) City of Beaver Falls |
| |||||
29(A) Construction, acquisition,
1materials, renovation, rehabilitation |
| |||||
4Project Allocation | 5,000,000 | |||||
5(Base Project Allocation - $5,000,000) |
| |||||
6(B) Construction, acquisition, |
| |||||
12Project Allocation | 2,500,000 | |||||
13(Base Project Allocation - $2,500,000) |
| |||||
14(C) Construction, acquisition, |
| |||||
20Project Allocation | 5,000,000 | |||||
21(Base Project Allocation - $5,000,000) |
| |||||
22(D) Construction, acquisition, |
| |||||
28Project Allocation | 500,000 | |||||
29(Base Project Allocation - $500,000) |
| |||||
30(E) Construction, acquisition,
1infrastructure, redevelopment, |
| |||||
6Project Allocation | 5,000,000 | |||||
7(Base Project Allocation - $5,000,000) |
| |||||
<-8(ii.1) Ambridge Borough |
| |||||
9(A) Acquisition, construction, |
| |||||
16Project Allocation | 10,000,000 | |||||
| ||||||
19(iii) Baden Borough |
| |||||
20(A) Acquisition, construction, |
| |||||
25Project Allocation | 5,000,000 | |||||
26(Base Project Allocation - $5,000,000) |
| |||||
27(iv) Center Township |
| |||||
28(A) Acquisition, construction,
1for Center Township development areas |
| |||||
2Project Allocation | 10,000,000 | |||||
| ||||||
5(v) Hopewell Township |
| |||||
6(A) Acquisition, construction, |
| |||||
10Project Allocation | 10,000,000 | |||||
| ||||||
13(vi) Midland Borough |
| |||||
14(A) Acquisition, construction, |
| |||||
20Project Allocation | 5,000,000 | |||||
21(Base Project Allocation - $5,000,000) |
| |||||
22(vii) Monaca Borough |
| |||||
23(A) Acquisition, construction, |
| |||||
29Project Allocation | 10,000,000 | |||||
30(Base Project Allocation -
1$10,000,000) |
| |||||
2(viii) New <-North Sewickley Township |
| |||||
3(A) Acquisition, construction, |
| |||||
8Project Allocation | 5,000,000 | |||||
9(Base Project Allocation - $5,000,000) |
| |||||
10(B) Construction, acquisition, |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $5,000,000) |
| |||||
15(ix) Potter Township |
| |||||
16(A) Acquisition, construction, |
| |||||
22Project Allocation | 5,000,000 | |||||
23(Base Project Allocation - $5,000,000) |
| |||||
24(x) Rochester Borough |
| |||||
25(A) Acquisition, construction, |
| |||||
30Project Allocation | 3,000,000 | |||||
1(Base Project Allocation - $3,000,000) |
| |||||
2(5) Bedford County (Reserved) |
| |||||
3(6) Berks County |
| |||||
4(i) County projects (Reserved) |
| |||||
<-5(ii) City of Reading |
| |||||
6(A) Construction, infrastructure, |
| |||||
11Project Allocation | 5,500,000 | |||||
12(Base Project Allocation - $5,500,000) |
| |||||
13(B) Construction, infrastructure, |
| |||||
18Project Allocation | 3,400,000 | |||||
19(Base Project Allocation - $3,400,000) |
| |||||
20(iii) West Reading Borough |
| |||||
21(A) Acquisition, construction, |
| |||||
25Project Allocation | 5,000,000 | |||||
26(Base Project Allocation - $5,000,000) |
| |||||
27(ii) <-(iv) Wyomissing Borough |
| |||||
28(A) Acquisition, construction,
1development site |
| |||||
2Project Allocation | 12,000,000 | |||||
| ||||||
5(7) Blair County (Reserved) |
| |||||
6(8) Bradford County |
| |||||
7(i) County projects (Reserved) |
| |||||
8(ii) Towanda Borough |
| |||||
9(A) Construction, infrastructure and |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $5,000,000) |
| |||||
<-15(iii) Wyalusing Borough |
| |||||
16(A) Construction, infrastructure and |
| |||||
19Project Allocation | 1,000,000 | |||||
20(Base Project Allocation - $1,000,000) |
| |||||
21(9) Bucks County |
| |||||
22(i) County projects |
| |||||
23(A) Construction, infrastructure and |
| |||||
26Project Allocation | 500,000 | |||||
27(Base Project Allocation - $500,000) |
| |||||
28(ii) Bensalem Township |
| |||||
29(A) Construction, infrastructure,
1conversion of a building into a |
| |||||
4Project Allocation | 2,000,000 | |||||
5(Base Project Allocation - $2,000,000) |
| |||||
<-6(iii) Buckingham Township |
| |||||
7(A) Construction, infrastructure and |
| |||||
11Project Allocation | 4,500,000 | |||||
12(Base Project Allocation - $4,500,000) |
| |||||
13(iv) Doylestown Township |
| |||||
14(A) Construction, infrastructure and |
| |||||
18Project Allocation | 2,500,000 | |||||
19(Base Project Allocation - $2,500,000) |
| |||||
20(v) Lower Makefield Township |
| |||||
21(A) Construction, infrastructure and |
| |||||
24Project Allocation | 1,250,000 | |||||
25(Base Project Allocation - $1,250,000) |
| |||||
26(B) Construction, infrastructure and |
| |||||
29Project Allocation | 1,000,000 | |||||
30(Base Project Allocation - $1,000,000) |
| |||||
1(vi) Morrisville Borough |
| |||||
2(A) Construction, infrastructure, |
| |||||
6Project Allocation | 1,000,000 | |||||
7(Base Project Allocation - $1,000,000) |
| |||||
8(iii) <-(vii) New Hope Borough |
| |||||
9(A) Construction, infrastructure and |
| |||||
12Project Allocation | 10,000,000 | |||||
| ||||||
<-15(viii) Newtown Township |
| |||||
16(A) Construction, infrastructure and |
| |||||
19Project Allocation | 2,000,000 | |||||
20(Base Project Allocation - $2,000,000) |
| |||||
| ||||||
23(A) Construction, infrastructure and |
| |||||
25Project Allocation | 2,500,000 | |||||
26(Base Project Allocation - $2,500,000) |
| |||||
<-27(x) Yardley Borough |
| |||||
28(A) Renovation and other related costs |
| |||||
1Project Allocation | 200,000 | |||||
2(Base Project Allocation - $200,000) |
| |||||
3(B) Construction, renovation and other |
| |||||
6Project Allocation | 25,000 | |||||
7(Base Project Allocation - $25,000) |
| |||||
8(10) Butler County (Reserved) |
| |||||
9(11) Cambria County (Reserved) |
| |||||
10(12) Cameron County (Reserved) |
| |||||
11(13) Carbon County (Reserved) |
| |||||
12(14) Centre County (Reserved) |
| |||||
13(15) Chester County |
| |||||
14(i) County projects (Reserved) |
| |||||
15(ii) City of Coatesville |
| |||||
16(A) Construction, infrastructure and |
| |||||
19Project Allocation | 500,000 | |||||
20(Base Project Allocation - $500,000) |
| |||||
<-21(B) Construction, redevelopment and |
| |||||
25Project Allocation | 5,000,000 | |||||
26(Base Project Allocation - $5,000,000) |
| |||||
27(C) Construction, infrastructure and |
| |||||
30Project Allocation | 5,000,000 | |||||
1(Base Project Allocation - $5,000,000) |
| |||||
2(iii) Willistown Township |
| |||||
3(A) Construction, acquisition and related |
| |||||
7Project Allocation | 8,500,000 | |||||
8(Base Project Allocation - $8,500,000) |
| |||||
9(16) Clarion County (Reserved) |
| |||||
10(17) Clearfield County (Reserved) |
| |||||
11(18) Clinton County (Reserved) |
| |||||
12(19) Columbia County (Reserved) | <- | |||||
13(i) County projects (Reserved) | <- | |||||
14(ii) Briar Creek Borough |
| |||||
15(A) For costs associated with the |
| |||||
18Project Allocation | 500,000 | |||||
19(Base Project Allocation - $500,000) |
| |||||
20(20) Crawford County (Reserved) |
| |||||
21(21) Cumberland County |
| |||||
22(i) County projects |
| |||||
23(A) Land acquisition, infrastructure |
| |||||
1Project Allocation | 10,000,000 | |||||
| ||||||
4(ii) East Pennsboro Township |
| |||||
5(A) Construction, infrastructure, |
| |||||
10Project Allocation | 15,000,000 | |||||
| ||||||
<-13(iii) South Middleton Township |
| |||||
14(A) Acquisition, construction, |
| |||||
20Project Allocation | 3,000,000 | |||||
21(Base Project Allocation - $3,000,000) |
| |||||
22(22) Dauphin County |
| |||||
23(i) County projects |
| |||||
24(A) Land acquisition, infrastructure
1System |
| |||||
2Project Allocation | 10,000,000 | |||||
| ||||||
<-5(B) Acquisition, construction, |
| |||||
8Project Allocation | 500,000 | |||||
9(Base Project Allocation - $500,000) |
| |||||
10(ii) City of Harrisburg |
| |||||
11(A) Construction, infrastructure, |
| |||||
16Project Allocation | 7,000,000 | |||||
17(Base Project Allocation - $7,000,000) |
| |||||
18(B) Construction, acquisition, |
| |||||
23Project Allocation | 10,000,000 | |||||
| ||||||
26(C) Construction, acquisition,
1business district |
| |||||
2Project Allocation | 5,000,000 | |||||
3(Base Project Allocation - $5,000,000) |
| |||||
4(D) Construction, infrastructure, |
| |||||
8Project Allocation | 1,000,000 | |||||
9(Base Project Allocation - $1,000,000) |
| |||||
<-10(E) Construction, infrastructure, |
| |||||
14Project Allocation | 1,600,000 | |||||
15(Base Project Allocation - $1,600,000) |
| |||||
16(iii) Hummelstown Borough |
| |||||
17(A) Construction, infrastructure, |
| |||||
21Project Allocation | 5,000,000 | |||||
22(Base Project Allocation - $5,000,000) |
| |||||
23(iv) Middletown Borough |
| |||||
24(A) Construction, infrastructure, |
| |||||
1Project Allocation | 15,000,000 | |||||
| ||||||
4(v) Derry Township Industrial and Commercial |
| |||||
6(A) Acquisition, construction, |
| |||||
10Project Allocation | 30,000,000 | |||||
| ||||||
13(B) Construction, infrastructure, |
| |||||
18Project Allocation | 10,000,000 | |||||
| ||||||
21(C) Construction, infrastructure, |
| |||||
28Project Allocation | 5,000,000 | |||||
29(Base Project Allocation - $5,000,000) |
| |||||
30(D) Acquisition, construction,
1infrastructure and related costs for a |
| |||||
3Project Allocation | 50,000,000 | |||||
| ||||||
6(E) Construction, infrastructure, |
| |||||
12Project Allocation | 25,000,000 | |||||
| ||||||
15(vi) Lower Swatara Township |
| |||||
16(A) Acquisition, construction, |
| |||||
20Project Allocation | 5,000,000 | |||||
21(Base Project Allocation - $5,000,000) |
| |||||
22(B) Construction, acquisition, |
| |||||
29Project Allocation | 20,000,000 | |||||
30(Base Project Allocation -
1$20,000,000) |
| |||||
2(vii) Swatara Township |
| |||||
3(A) Acquisition, construction, |
| |||||
9Project Allocation | 50,000,000 | |||||
| ||||||
12(23) Delaware County |
| |||||
13(i) County projects |
| |||||
14(A) Construction, infrastructure, |
| |||||
19Project Allocation | 20,000,000 | |||||
| ||||||
<-22(B) Acquisition, construction, |
| |||||
27Project Allocation | 4,000,000 | |||||
28(Base Project Allocation - $4,000,000) |
| |||||
29(C) Acquisition, construction,
1an economic development project, |
| |||||
4Project Allocation | 10,000,000 | |||||
| ||||||
| ||||||
9Project Allocation | 2,750,000 | |||||
10(Base Project Allocation - $2,750,000) |
| |||||
11(ii) Chester Heights Borough |
| |||||
12(A) Construction, infrastructure and |
| |||||
15Project Allocation | 10,000,000 | |||||
| ||||||
18(B) Construction, infrastructure, |
| |||||
23Project Allocation | 500,000 | |||||
24(Base Project Allocation - $500,000) |
| |||||
25(ii) <-(iii) Darby Borough |
| |||||
26(A) Construction, renovation, |
| |||||
30Project Allocation | 500,000 | |||||
1(Base Project Allocation - $500,000) |
| |||||
<-2(B) Construction, infrastructure, |
| |||||
6Project Allocation | 500,000 | |||||
7(Base Project Allocation - $500,000) |
| |||||
8(iv) Marple Township |
| |||||
9(A) Construction, infrastructure and |
| |||||
13Project Allocation | 4,100,000 | |||||
14(Base Project Allocation - $4,100,000) |
| |||||
15(B) Construction, infrastructure and |
| |||||
20Project Allocation | 654,000 | |||||
21(Base Project Allocation - $654,000) |
| |||||
22(v) Morton Borough |
| |||||
23(A) Renovation and related costs for |
| |||||
25Project Allocation | 500,000 | |||||
26(Base Project Allocation - $500,000) |
| |||||
27(vi) Newtown Township |
| |||||
28(A) Construction, infrastructure,
1expand existing Melmark plant |
| |||||
2Project Allocation | 10,000,000 | |||||
| ||||||
5(vii) Radnor Township |
| |||||
6(A) Construction, infrastructure and |
| |||||
9Project Allocation | 900,000 | |||||
10(Base Project Allocation - $900,000) |
| |||||
11(B) Renovation, construction and related |
| |||||
14Project Allocation | 3,900,000 | |||||
15(Base Project Allocation - $3,900,000) |
| |||||
16(C) Construction, infrastructure, |
| |||||
21Project Allocation | 5,000,000 | |||||
22(Base Project Allocation - $5,000,000) |
| |||||
23(viii) Springfield Township |
| |||||
24(A) Construction, infrastructure, |
| |||||
29Project Allocation | 2,500,000 | |||||
30(Base Project Allocation - $2,500,000) |
| |||||
1(24) Elk County (Reserved) |
| |||||
2(25) Erie County |
| |||||
3(i) County projects (Reserved) |
| |||||
4(ii) Harborcreek Township |
| |||||
5(A) Construction, renovation and related |
| |||||
8Project Allocation | 1,500,000 | |||||
9(Base Project Allocation - $1,500,000) |
| |||||
10(26) Fayette County (Reserved) |
| |||||
11(27) Forest County (Reserved) |
| |||||
12(28) Franklin County |
| |||||
13(i) County projects (Reserved) |
| |||||
<-14(ii) Antrim Township |
| |||||
15(A) Acquisition, construction, |
| |||||
19Project Allocation | 5,000,000 | |||||
20Base Project Allocation - $5,000,000) |
| |||||
21(ii) <-(iii) Greene Township |
| |||||
22(A) Rehabilitation of existing aviation |
| |||||
27Project Allocation | 700,000 | |||||
28(Base Project Allocation - $700,000) |
| |||||
29(B) <-(A) Construction, infrastructure,
1economic development project at |
| |||||
3Project Allocation | 5,000,000 | |||||
4(Base Project Allocation - $5,000,000) |
| |||||
5(29) Fulton County (Reserved) |
| |||||
6(30) Greene County (Reserved) |
| |||||
7(31) Huntingdon County (Reserved) |
| |||||
8(32) Indiana County (Reserved) |
| |||||
9(33) Jefferson County (Reserved) |
| |||||
10(34) Juniata County (Reserved) |
| |||||
11(35) Lackawanna County (Reserved) | <- | |||||
12(i) County projects (Reserved) | <- | |||||
13(ii) Moscow Borough |
| |||||
14(A) Construction, acquisition, |
| |||||
20Project Allocation | 2,500,000 | |||||
21(Base Project Allocation - $2,500,000) |
| |||||
22(36) Lancaster County |
| |||||
23(i) County projects (Reserved) |
| |||||
<-24(ii) City of Lancaster |
| |||||
25(A) Construction, infrastructure and |
| |||||
28Project Allocation | 5,000,000 | |||||
29(Base Project Allocation - $5,000,000) |
| |||||
30(B) Construction, infrastructure,
1redevelopment and other related costs |
| |||||
3Project Allocation | 15,000,000 | |||||
| ||||||
6(C) Construction, infrastructure, |
| |||||
10Project Allocation | 10,000,000 | |||||
| ||||||
13(D) Acquisition, construction, |
| |||||
17Project Allocation | 15,000,000 | |||||
| ||||||
20(E) Acquisition, construction, |
| |||||
24Project Allocation | 10,000,000 | |||||
| ||||||
27(F) Acquisition, construction, |
| |||||
1Project Allocation | 7,000,000 | |||||
2(Base Project Allocation - $7,000,000) |
| |||||
3(ii) <-(iii) Columbia Borough |
| |||||
4(A) Construction, infrastructure, |
| |||||
7Project Allocation | 500,000 | |||||
8(Base Project Allocation - $500,000) |
| |||||
9(iii) <-(iv) East Lampeter Township |
| |||||
10(A) Construction, infrastructure, |
| |||||
13Project Allocation | 1,000,000 | |||||
14(Base Project Allocation - $1,000,000) |
| |||||
15(B) Construction, infrastructure, |
| |||||
19Project Allocation | 2,500,000 | |||||
20(Base Project Allocation - $2,500,000) |
| |||||
<-21(v) Lititz Borough |
| |||||
22(A) Construction, infrastructure, |
| |||||
26Project Allocation | 8,000,000 | |||||
27(Base Project Allocation - $8,000,000) |
| |||||
28(iv) <-(vi) Manheim Borough |
| |||||
29(A) Construction, infrastructure and
1building |
| |||||
2Project Allocation | 1,500,000 | |||||
3(Base Project Allocation - $1,500,000) |
| |||||
<-4(B) Construction, infrastructure, |
| |||||
9Project Allocation | 1,000,000 | |||||
10(Base Project Allocation - $1,000,000) |
| |||||
11(vii) Strasburg Township |
| |||||
12(A) Acquisition, construction, |
| |||||
16Project Allocation | 10,500,000 | |||||
| ||||||
19(v) <-(viii) West Lampeter Township |
| |||||
20(A) Construction, redevelopment, |
| |||||
24Project Allocation | 1,500,000 | |||||
25(Base Project Allocation - $1,500,000) |
| |||||
26(37) Lawrence County |
| |||||
27(i) County projects |
| |||||
28(A) Construction, acquisition,
1renovation, rehabilitation and other |
| |||||
6Project Allocation | 10,000,000 | |||||
| ||||||
9(B) Construction, acquisition, |
| |||||
15Project Allocation | 5,000,000 | |||||
16(Base Project Allocation - $5,000,000) |
| |||||
17(C) Construction, acquisition, |
| |||||
23Project Allocation | 7,250,000 | |||||
24(Base Project Allocation - $7,250,000) |
| |||||
25(D) Construction, acquisition,
1corridor |
| |||||
2Project Allocation | 12,500,000 | |||||
| ||||||
5(E) Construction, acquisition, |
| |||||
12Project Allocation | 12,500,000 | |||||
| ||||||
15(F) Construction, acquisition, |
| |||||
22Project Allocation | 5,000,000 | |||||
23(Base Project Allocation - $5,000,000) |
| |||||
24(G) Construction, acquisition, |
| |||||
1Project Allocation | 12,500,000 | |||||
| ||||||
4(ii) City of New Castle |
| |||||
5(A) Construction, infrastructure, |
| |||||
10Project Allocation | 1,000,000 | |||||
11(Base Project Allocation - $1,000,000) |
| |||||
12(B) Construction, infrastructure, |
| |||||
16Project Allocation | 1,000,000 | |||||
17(Base Project Allocation - $1,000,000) |
| |||||
18(C) Construction, acquisition, |
| |||||
24Project Allocation | 10,000,000 | |||||
| ||||||
27(D) Construction, acquisition, |
| |||||
3Project Allocation | 5,000,000 | |||||
4(Base Project Allocation - $5,000,000) |
| |||||
5(iii) Hickory Township |
| |||||
6(A) Construction, acquisition, |
| |||||
10Project Allocation | 10,000,000 | |||||
| ||||||
13(iv) Neshannock Township |
| |||||
14(A) Construction, acquisition, |
| |||||
18Project Allocation | 15,000,000 | |||||
| ||||||
21(v) New Beaver Borough |
| |||||
22(A) Construction, acquisition, |
| |||||
28Project Allocation | 3,000,000 | |||||
29(Base Project Allocation - $3,000,000) |
| |||||
30(38) Lebanon County |
| |||||
1(i) County projects |
| |||||
2(A) Acquisition, construction, |
| |||||
9Project Allocation | 5,000,000 | |||||
10(Base Project Allocation - $5,000,000) |
| |||||
11(ii) Palmyra Borough |
| |||||
12(A) Construction, infrastructure and |
| |||||
15Project Allocation | 2,000,000 | |||||
16(Base Project Allocation - $2,000,000) |
| |||||
17(39) Lehigh County |
| |||||
18(i) County projects (Reserved) |
| |||||
19(ii) City of Allentown |
| |||||
20(A) Construction, renovation, |
| |||||
25Project Allocation | 1,000,000 | |||||
26(Base Project Allocation - $1,000,000) |
| |||||
27(B) Construction, infrastructure, |
| |||||
1Project Allocation | 500,000 | |||||
2(Base Project Allocation - $500,000) |
| |||||
3(C) Construction, infrastructure, |
| |||||
7Project Allocation | 2,500,000 | |||||
8(Base Project Allocation - $2,500,000) |
| |||||
9(D) Construction, renovation, |
| |||||
12Project Allocation | 752,000 | |||||
13(Base Project Allocation - $752,000) |
| |||||
14(E) Construction, renovation, |
| |||||
19Project Allocation | 2,000,000 | |||||
20(Base Project Allocation - $2,000,000) |
| |||||
21(F) Construction, infrastructure, |
| |||||
25Project Allocation | 3,000,000 | |||||
26(Base Project Allocation - $3,000,000) |
| |||||
27(G) Construction, infrastructure,
1manufacturing site |
| |||||
2Project Allocation | 5,000,000 | |||||
3(Base Project Allocation - $5,000,000) |
| |||||
4(H) Acquisition, construction, |
| |||||
9Project Allocation | 5,000,000 | |||||
10(Base Project Allocation - $5,000,000) |
| |||||
11(I) Construction, renovation |
| |||||
15Project Allocation | 4,000,000 | |||||
16(Base Project Allocation - $4,000,000) |
| |||||
<-17(J) Acquisition, construction, |
| |||||
21Project Allocation | 20,000,000 | |||||
| ||||||
24(K) Renovation and other related costs |
| |||||
27Project Allocation | 5,000,000 | |||||
28(Base Project Allocation - $5,000,000) |
| |||||
29(L) Construction, infrastructure and
1residential cottage development |
| |||||
2Project Allocation | 3,000,000 | |||||
3(Base Project Allocation - $3,000,000) |
| |||||
4(M) Construction, redevelopment, |
| |||||
7Project Allocation | 500,000 | |||||
8(Base Project Allocation - $500,000) |
| |||||
9(N) Construction, infrastructure, |
| |||||
12Project Allocation | 5,000,000 | |||||
13(Base Project Allocation - $5,000,000) |
| |||||
14(iii) Heidelberg Township |
| |||||
15(A) Construction, infrastructure and |
| |||||
18Project Allocation | 600,000 | |||||
19(Base Project Allocation - $600,000) |
| |||||
20(iv) Lynn Township |
| |||||
21(A) Construction, redevelopment and |
| |||||
25Project Allocation | 855,000 | |||||
26(Base Project Allocation - $855,000) |
| |||||
27(v) Upper Macungie Township |
| |||||
28(A) Acquisition, construction and related
1area police use |
| |||||
2Project Allocation | 500,000 | |||||
3(Base Project Allocation - $500,000) |
| |||||
4(B) Construct parking, sidewalks, |
| |||||
8Project Allocation | 500,000 | |||||
9(Base Project Allocation - $500,000) |
| |||||
10(C) Acquisition, construction, |
| |||||
14Project Allocation | 1,000,000 | |||||
15(Base Project Allocation - $1,000,000) |
| |||||
16(D) Construction, acquisition, |
| |||||
20Project Allocation | 500,000 | |||||
21(Base Project Allocation - $500,000) |
| |||||
22(40) Luzerne County (Reserved) | <- | |||||
23(i) County projects (Reserved) | <- | |||||
24(ii) City of Pittston |
| |||||
25(A) Construction, acquisition, |
| |||||
1Project Allocation | 3,500,000 | |||||
2(Base Project Allocation - $3,500,000) |
| |||||
3(41) Lycoming County |
| |||||
4(i) County projects |
| |||||
5(A) Infrastructure, construction and |
| |||||
9Project Allocation | 1,200,000 | |||||
10(Base Project Allocation - $1,200,000) |
| |||||
11(ii) City of Williamsport |
| |||||
12(A) Acquisition, remediation, |
| |||||
16Project Allocation | 5,000,000 | |||||
17(Base Project Allocation - $5,000,000) |
| |||||
18(B) Construction, infrastructure, |
| |||||
23Project Allocation | 2,300,000 | |||||
24(Base Project Allocation - $2,300,000) |
| |||||
<-25(C) Construction, infrastructure, |
| |||||
28Project Allocation | 1,000,000 | |||||
29(Base Project Allocation - $1,000,000 |
| |||||
30(D) Construction, infrastructure,
1renovation and other related costs for |
| |||||
4Project Allocation | 500,000 | |||||
5(Base Project Allocation - $500,000 |
| |||||
6(E) Construction, infrastructure, |
| |||||
10Project Allocation | 1,500,000 | |||||
11(Base Project Allocation - $1,500,000 |
| |||||
12(F) Acquisition, construction, |
| |||||
16Project Allocation | 3,000,000 | |||||
17(Base Project Allocation - $3,000,000 |
| |||||
18(G) Acquisition, construction, |
| |||||
24Project Allocation | 5,000,000 | |||||
25(Base Project Allocation - $5,000,000 |
| |||||
26(iii) Muncy Township |
| |||||
27(A) Renovation and expansion of Eastern |
| |||||
29Project Allocation | 1,000,000 | |||||
30(Base Project Allocation - $1,000,000) |
| |||||
1(42) McKean County |
| |||||
2(i) County projects (Reserved) |
| |||||
3(ii) City of Bradford |
| |||||
4(A) Redevelopment, acquisition, |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $5,000,000) |
| |||||
15(B) Acquisition of property, demolition, |
| |||||
21Project Allocation | 5,000,000 | |||||
22(Base Project Allocation - $5,000,000) |
| |||||
<-23(C) Site clearance, demolition, |
| |||||
28Project Allocation | 10,000,000 | |||||
29(Base Project Allocation - $10,000,000 |
| |||||
30(43) Mercer County |
| |||||
1(i) County projects |
| |||||
2(A) Acquisition, infrastructure, |
| |||||
7Project Allocation | 2,500,000 | |||||
8(Base Project Allocation - $2,500,000) |
| |||||
9(B) Construction, infrastructure and |
| |||||
12Project Allocation | 2,000,000 | |||||
13(Base Project Allocation - $2,000,000) |
| |||||
14(ii) City of Farrell |
| |||||
15(A) Acquisition, infrastructure, |
| |||||
19Project Allocation | 1,500,000 | |||||
20(Base Project Allocation - $1,500,000) |
| |||||
21(iii) City of Sharon |
| |||||
22(A) Construction, infrastructure, |
| |||||
26Project Allocation | 500,000 | |||||
27(Base Project Allocation - $500,000) |
| |||||
28(iv) Greene Township |
| |||||
29(A) Construction, infrastructure,
1costs for equipment and the expansion |
| |||||
3Project Allocation | 4,000,000 | |||||
4(Base Project Allocation - $4,000,000) |
| |||||
5(44) Mifflin County (Reserved) | <- | |||||
6(i) County projects (Reserved) | <- | |||||
7(ii) Derry Township |
| |||||
8(A) Construction, acquisition, |
| |||||
12Project Allocation | 4,000,000 | |||||
13(Base Project Allocation - $4,000,000) |
| |||||
14(iii) Granville Township |
| |||||
15(A) Construction, infrastructure, |
| |||||
20Project Allocation | 3,000,000 | |||||
21(Base Project Allocation - $3,000,000) |
| |||||
22(iv) Lewistown Borough |
| |||||
23(A) Construction, acquisition, |
| |||||
27Project Allocation | 1,250,000 | |||||
28(Base Project Allocation - $1,250,000) |
| |||||
29(45) Monroe County |
| |||||
30(i) County projects (Reserved) |
| |||||
<-1(ii) East Stroudsburg Borough |
| |||||
2(A) Acquisition, construction, |
| |||||
6Project Allocation | 500,000 | |||||
7(Base Project Allocation - $500,000) |
| |||||
8(ii) <-(iii) Mount Pocono Borough |
| |||||
9(A) Construction, infrastructure and |
| |||||
12Project Allocation | 750,000 | |||||
13(Base Project Allocation - $750,000) |
| |||||
14(46) Montgomery County |
| |||||
15(i) County projects (Reserved) |
| |||||
16(ii) Cheltanham Township |
| |||||
17(A) Renovation, rehabilitation and other |
| |||||
20Project Allocation | 2,500,000 | |||||
21(Base Project Allocation - $2,500,000) |
| |||||
<-22(B) Construction, infrastructure and |
| |||||
26Project Allocation | 3,000,000 | |||||
27(Base Project Allocation - $3,000,000) |
| |||||
28(C) Construction, renovation and other |
| |||||
1Project Allocation | 5,000,000 | |||||
2(Base Project Allocation - $5,000,000) |
| |||||
3(D) Acquisition, construction, |
| |||||
7Project Allocation | 750,000 | |||||
8(Base Project Allocation - $750,000) |
| |||||
9(E) Construction, infrastructure and |
| |||||
13Project Allocation | 1,829,000 | |||||
14(Base Project Allocation - $1,829,000) |
| |||||
15(F) Acquisition, construction, |
| |||||
19Project Allocation | 7,500,000 | |||||
20(Base Project Allocation - $7,500,000) |
| |||||
21(iii) Conshohocken Borough |
| |||||
22(A) Construction, redevelopment and other |
| |||||
25Project Allocation | 8,000,000 | |||||
26(Base Project Allocation - $8,000,000) |
| |||||
27(iv) Hatfield Borough |
| |||||
28(A) Construction, infrastructure, |
| |||||
1Project Allocation | 1,500,000 | |||||
2(Base Project Allocation - $1,500,000) |
| |||||
<-3(v) Hatfield Township |
| |||||
4(A) Acquisition and related costs for |
| |||||
6Project Allocation | 1,000,000 | |||||
7(Base Project Allocation - $1,000,000) |
| |||||
8(vi) Horsham Township |
| |||||
9(A) Construction, infrastructure and |
| |||||
12Project Allocation | 4,000,000 | |||||
13(Base Project Allocation - $4,000,000) |
| |||||
14(v) <-(vii) Lower Gwynedd Township |
| |||||
15(A) Construction, infrastructure and |
| |||||
18Project Allocation | 1,250,000 | |||||
19(Base Project Allocation - $1,250,000) |
| |||||
20(vi) <-(viii) Lower Merion Township |
| |||||
21(A) Construction, infrastructure, |
| |||||
24Project Allocation | 10,000,000 | |||||
| ||||||
<-27(B) Construction, renovation and other |
| |||||
30Project Allocation | 7,000,000 | |||||
1(Base Project Allocation - $7,000,000) |
| |||||
2(vii) <-(ix) Pottstown Borough |
| |||||
3(A) Construction, rehabilitation and |
| |||||
6Project Allocation | 500,000 | |||||
7(Base Project Allocation - $500,000) |
| |||||
8(B) Construction, infrastructure, |
| |||||
12Project Allocation | 500,000 | |||||
13(Base Project Allocation - $500,000) |
| |||||
<-14(x) Springfield Township |
| |||||
15(A) Construction, infrastructure, |
| |||||
18Project Allocation | 1,516,000 | |||||
19(Base Project Allocation - $1,516,000) |
| |||||
20(viii) <-(xi) Whitpain Township |
| |||||
21(A) Construction infrastructure, |
| |||||
24Project Allocation | 2,000,000 | |||||
25(Base Project Allocation - $2,000,000) |
| |||||
26(B) Construction, acquisition,
1Girls Club |
| |||||
2Project Allocation | 4,000,000 | |||||
3(Base Project Allocation - $4,000,000) |
| |||||
4(47) Montour County (Reserved) |
| |||||
5(48) Northampton County |
| |||||
6(i) County projects (Reserved) |
| |||||
<-7(ii) City of Bethlehem |
| |||||
8(A) Construction, infrastructure and |
| |||||
12Project Allocation | 5,000,000 | |||||
13(Base Project Allocation - $5,000,000) |
| |||||
14(B) Construction, infrastructure and |
| |||||
18Project Allocation | 10,000,000 | |||||
| ||||||
21(C) Construction, infrastructure, |
| |||||
25Project Allocation | 3,000,000 | |||||
26(Base Project Allocation - $3,000,000) |
| |||||
27(D) Acquisition of research facility and |
| |||||
3Project Allocation | 4,000,000 | |||||
4(Base Project Allocation - $4,000,000) |
| |||||
5(iii) Freemansburg Borough |
| |||||
6(A) Construction, infrastructure, |
| |||||
10Project Allocation | 1,800,000 | |||||
11(Base Project Allocation - $1,800,000) |
| |||||
12(ii) <-(iv) Pen Argyl Borough |
| |||||
13(A) Construction and related costs for |
| |||||
16Project Allocation | 1,500,000 | |||||
17(Base Project Allocation - $1,500,000) |
| |||||
18(B) Construction, infrastructure and |
| |||||
21Project Allocation | 500,000 | |||||
22(Base Project Allocation - $500,000) |
| |||||
23(C) Construction, infrastructure and |
| |||||
26Project Allocation | 500,000 | |||||
27(Base Project Allocation - $500,000) |
| |||||
<-28(v) Williams Township |
| |||||
29(A) Construction, infrastructure,
1for municipal park development |
| |||||
2Project Allocation | 500,000 | |||||
3(Base Project Allocation - $500,000) |
| |||||
4(49) Northumberland County (Reserved) | <- | |||||
5(i) County projects (Reserved) | <- | |||||
6(ii) City of Shamokin |
| |||||
7(A) Acquisition, demolition, renovation, |
| |||||
12Project Allocation | 1,500,000 | |||||
13(Base Project Allocation - $1,500,000) |
| |||||
14(B) Acquisition, renovation, abatement of |
| |||||
18Project Allocation | 500,000 | |||||
19(Base Project Allocation - $500,000) |
| |||||
20(iii) Milton Borough |
| |||||
21(A) Construction, redevelopment, |
| |||||
24Project Allocation | 5,000,000 | |||||
25(Base Project Allocation - $5,000,000) |
| |||||
26(iv) Ralpho Township |
| |||||
27(A) Construction, infrastructure,
1township buildings |
| |||||
2Project Allocation | 500,000 | |||||
3(Base Project Allocation - $500,000) |
| |||||
4(50) Perry County |
| |||||
5(i) County projects |
| |||||
6(A) Land acquisition, infrastructure |
| |||||
14Project Allocation | 10,000,000 | |||||
| ||||||
17(51) Philadelphia County |
| |||||
18(i) County projects |
| |||||
19(A) Renovation and related costs for |
| |||||
21Project Allocation | 500,000 | |||||
22(Base Project Allocation - $500,000) |
| |||||
<-23(B) Construction, infrastructure, |
| |||||
27Project Allocation | 10,000,000 | |||||
| ||||||
30(ii) City of Philadelphia |
| |||||
1(A) Acquisition, construction, |
| |||||
9Project Allocation | 2,500,000 | |||||
10(Base Project Allocation - $2,500,000) |
| |||||
11(B) Acquisition, construction, |
| |||||
19Project Allocation | 2,500,000 | |||||
20(Base Project Allocation - $2,500,000) |
| |||||
21(C) Acquisition, construction, |
| |||||
30Project Allocation | 5,000,000 | |||||
1(Base Project Allocation - $5,000,000) |
| |||||
2(D) Construction, renovation, |
| |||||
7Project Allocation | 3,500,000 | |||||
8(Base Project Allocation - $3,500,000) |
| |||||
9(E) Construction, infrastructure and |
| |||||
12Project Allocation | 2,000,000 | |||||
13(Base Project Allocation - $2,000,000) |
| |||||
14(F) Construction, infrastructure, |
| |||||
18Project Allocation | 4,000,000 | |||||
19(Base Project Allocation - $4,000,000) |
| |||||
<-20(G) Construction, infrastructure, |
| |||||
24Project Allocation | 2,500,000 | |||||
25(Base Project Allocation - $2,500,000) |
| |||||
26(H) Acquisition, construction, |
| |||||
1Project Allocation | 500,000 | |||||
2(Base Project Allocation - $500,000) |
| |||||
3(I) Acquisition, construction, |
| |||||
8Project Allocation | 2,500,000 | |||||
9(Base Project Allocation - $2,500,000) |
| |||||
10(J) Acquisition, construction, |
| |||||
13Project Allocation | 1,000,000 | |||||
14(Base Project Allocation - $1,000,000) |
| |||||
15(K) Acquisition, construction, |
| |||||
20Project Allocation | 3,000,000 | |||||
21(Base Project Allocation - $3,000,000) |
| |||||
22(L) Acquisition, construction, |
| |||||
27Project Allocation | 1,000,000 | |||||
28(Base Project Allocation - $1,000,000) |
| |||||
29(M) Acquisition, construction,
1related costs to rehabilitate a |
| |||||
4Project Allocation | 500,000 | |||||
5(Base Project Allocation - $500,000) |
| |||||
6(N) Acquisition, construction, |
| |||||
10Project Allocation | 2,000,000 | |||||
11(Base Project Allocation - $2,000,000) |
| |||||
12(O) Acquisition, construction, |
| |||||
17Project Allocation | 4,000,000 | |||||
18(Base Project Allocation - $4,000,000) |
| |||||
19(P) Construction, infrastructure, |
| |||||
22Project Allocation | 3,000,000 | |||||
23(Base Project Allocation - $3,000,000) |
| |||||
24(Q) Acquisition, construction, |
| |||||
28Project Allocation | 15,000,000 | |||||
| ||||||
1(R) Acquisition, demolition, |
| |||||
5Project Allocation | 10,000,000 | |||||
| ||||||
8(S) Construction, infrastructure and |
| |||||
11Project Allocation | 3,000,000 | |||||
12(Base Project Allocation - $3,000,000) |
| |||||
13(T) Acquisition, construction, |
| |||||
17Project Allocation | 7,500,000 | |||||
18(Base Project Allocation - $7,500,000) |
| |||||
19(U) Acquisition, construction, |
| |||||
24Project Allocation | 2,500,000 | |||||
25(Base Project Allocation - $2,500,000) |
| |||||
26(V) Acquisition, construction and other |
| |||||
29Project Allocation | 10,000,000 | |||||
30(Base Project Allocation -
1$10,000,000) |
| |||||
2(W) Acquisition, demolition, |
| |||||
7Project Allocation | 2,500,000 | |||||
8(Base Project Allocation - $2,500,000) |
| |||||
9(X) Acquisition, construction, |
| |||||
13Project Allocation | 10,000,000 | |||||
| ||||||
16(Y) Acquisition, construction, |
| |||||
21Project Allocation | 10,000,000 | |||||
| ||||||
24(Z) Acquisition, construction and other |
| |||||
27Project Allocation | 10,000,000 | |||||
| ||||||
30(AA) Construction, acquisition and other
1related costs for a residential |
| |||||
4Project Allocation | 10,000,000 | |||||
| ||||||
7(BB) Construction, acquisition and other |
| |||||
11Project Allocation | 10,000,000 | |||||
| ||||||
14(CC) Acquisition, construction and other |
| |||||
17Project Allocation | 10,000,000 | |||||
| ||||||
20(DD) Acquisition, construction and other |
| |||||
24Project Allocation | 10,000,000 | |||||
| ||||||
27(EE) Acquisition, construction and other |
| |||||
1Project Allocation | 10,000,000 | |||||
| ||||||
4(FF) Construction, acquisition, |
| |||||
8Project Allocation | 10,000,000 | |||||
| ||||||
11(GG) Land acquisition, infrastructure, |
| |||||
15Project Allocation | 1,000,000 | |||||
16(Base Project Allocation - $1,000,000) |
| |||||
17(HH) Acquisition, demolition, |
| |||||
20Project Allocation | 5,000,000 | |||||
21(Base Project Allocation - $5,000,000) |
| |||||
22(II) Construction, infrastructure and |
| |||||
25Project Allocation | 6,424,000 | |||||
26(Base Project Allocation - $6,424,000) |
| |||||
27(JJ) Acquisition, demolition, |
| |||||
1Project Allocation | 1,000,000 | |||||
2(Base Project Allocation - $1,000,000) |
| |||||
3(KK) Land acquisition, infrastructure, |
| |||||
7Project Allocation | 1,000,000 | |||||
8(Base Project Allocation - $1,000,000) |
| |||||
9(LL) Infrastructure, acquisition, |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $5,000,000) |
| |||||
15(MM) Development of new intermodal |
| |||||
18Project Allocation | 6,000,000 | |||||
19(Base Project Allocation - $6,000,000) |
| |||||
20(NN) Development of new intermodal |
| |||||
23Project Allocation | 6,000,000 | |||||
24(Base Project Allocation - $6,000,000) |
| |||||
| ||||||
27Project Allocation | 5,000,000 | |||||
28(Base Project Allocation - $5,000,000) |
| |||||
29(PP) Construction, infrastructure,
1related costs for Sterling mixed-use |
| |||||
4Project Allocation | 5,000,000 | |||||
5(Base Project Allocation - $5,000,000) |
| |||||
6(QQ) Acquisition, construction, |
| |||||
11Project Allocation | 1,000,000 | |||||
12(Base Project Allocation - $1,000,000) |
| |||||
13(RR) Construction, infrastructure, |
| |||||
19Project Allocation | 2,000,000 | |||||
20(Base Project Allocation - $2,000,000) |
| |||||
21(SS) Acquisition, construction, |
| |||||
25Project Allocation | 5,000,000 | |||||
26(Base Project Allocation - $5,000,000) |
| |||||
27(TT) Acquisition, construction,
1services, conduct research, provide |
| |||||
3Project Allocation | 15,000,000 | |||||
| ||||||
6(UU) Construction, renovation and |
| |||||
10Project Allocation | 10,000,000 | |||||
| ||||||
13(VV) Acquisition, construction, |
| |||||
18Project Allocation | 500,000 | |||||
19(Base Project Allocation - $500,000) |
| |||||
20(52) Pike County (Reserved) |
| |||||
21(53) Potter County (Reserved) |
| |||||
22(54) Schuylkill County |
| |||||
23(i) County projects (Reserved) |
| |||||
24(ii) East Union Township |
| |||||
25(A) Construction, infrastructure, |
| |||||
30Project Allocation | 1,000,000 | |||||
1(Base Project Allocation - $1,000,000) |
| |||||
2(iii) West Mahanoy Township |
| |||||
3(A) Construction, renovations and related |
| |||||
5Project Allocation | 500,000 | |||||
6(Base Project Allocation - $500,000) |
| |||||
7(55) Snyder County (Reserved) |
| |||||
8(56) Somerset County (Reserved) |
| |||||
9(57) Sullivan County (Reserved) |
| |||||
10(58) Susquehanna County |
| |||||
11(i) County projects |
| |||||
12(A) Construction, infrastructure, |
| |||||
15Project Allocation | 1,500,000 | |||||
16(Base Project Allocation - $1,500,000) |
| |||||
17(59) Tioga County (Reserved) |
| |||||
18(60) Union County (Reserved) |
| |||||
19(61) Venango County |
| |||||
20(i) County projects (Reserved) |
| |||||
21(ii) City of Oil City |
| |||||
22(A) Construction, rehabilitation and |
| |||||
25Project Allocation | 875,000 | |||||
26(Base Project Allocation - $875,000) |
| |||||
27(62) Warren County (Reserved) |
| |||||
28(63) Washington County (Reserved) |
| |||||
29(64) Wayne County (Reserved) |
| |||||
30(65) Westmoreland County |
| |||||
1(i) County projects (Reserved) |
| |||||
2(ii) Ligonier Borough |
| |||||
3(A) Construction, redevelopment, |
| |||||
7Project Allocation | 800,000 | |||||
8(Base Project Allocation - $800,000) |
| |||||
9(iii) Unity Township |
| |||||
10(A) Construction and related costs of |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $5,000,000) |
| |||||
15(66) Wyoming County (Reserved) |
| |||||
16(67) York County |
| |||||
17(i) County projects |
| |||||
18(A) Land acquisition, infrastructure |
| |||||
26Project Allocation | 10,000,000 | |||||
| ||||||
<-29(B) Acquisition, construction,
1renovation, abatement of hazardous |
| |||||
7Project Allocation | 5,000,000 | |||||
8(Base Project Allocation - $5,000,000) |
| |||||
9(ii) City of York |
| |||||
10(A) Acquisition, construction, |
| |||||
15Project Allocation | 10,000,000 | |||||
| ||||||
18(B) Construction, infrastructure, |
| |||||
23Project Allocation | 1,000,000 | |||||
24(Base Project Allocation - $1,000,000) |
| |||||
25(C) Acquisition, construction, |
| |||||
1Project Allocation | 1,000,000 | |||||
2(Base Project Allocation - $1,000,000) |
| |||||
3(D) Acquisition, construction, |
| |||||
8Project Allocation | 5,000,000 | |||||
9(Base Project Allocation - $5,000,000) |
| |||||
10(E) Acquisition, construction, |
| |||||
14Project Allocation | 3,500,000 | |||||
15(Base Project Allocation - $3,500,000) |
| |||||
16(F) Acquisition, infrastructure, |
| |||||
20Project Allocation | 10,000,000 | |||||
| ||||||
23(ii) <-(iii) Fairview Township |
| |||||
24(A) Construction, infrastructure, |
| |||||
28Project Allocation | 5,000,000 | |||||
29(Base Project Allocation - $5,000,000) |
| |||||
<-30(B) Construction, infrastructure,
1acquisition, redevelopment and related |
| |||||
4Project Allocation | 2,000,000 | |||||
5(Base Project Allocation - $2,000,000) |
| |||||
6(iv) Hanover Borough |
| |||||
7(A) Construction, infrastructure, |
| |||||
12Project Allocation | 900,000 | |||||
13(Base Project Allocation - $900,000) |
| |||||
14(iii) <-(v) Spring Garden Township |
| |||||
15(A) Construction, infrastructure and |
| |||||
18Project Allocation | 10,000,000 | |||||
| ||||||
<-21(B) Acquisition, construction, |
| |||||
24Project Allocation | 7,500,000 | |||||
25(Base Project Allocation - $7,500,000) |
| |||||
26(vi) Springettsbury Township |
| |||||
27(A) Construction, redevelopment, |
| |||||
1Project Allocation | 3,500,000 | |||||
2(Base Project Allocation - $3,500,000) |
| |||||
3(68) Multiple Counties |
| |||||
4(i) Beaver and Lawrence Counties |
| |||||
5(A) Construction, acquisition, |
| |||||
11Project Allocation | 5,000,000 | |||||
12(Base Project Allocation - $5,000,000) |
| |||||
13(B) Construction, acquisition, |
| |||||
18Project Allocation | 2,500,000 | |||||
19(Base Project Allocation - $2,500,000) |
| |||||
<-20(ii) Berks and York Counties |
| |||||
21(A) Acquisition, construction, |
| |||||
29Project Allocation | 25,000,000 | |||||
30(Base Project Allocation -
1$25,000,000) |
|
2Section 7. Itemization of flood control projects.
3Additional capital projects in the category of flood control
4projects to be constructed by the Department of Environmental
5Protection, its successors or assigns, and to be financed by the
6incurring of debt are hereby itemized, together with their
7respective estimated costs, as follows:
9Project | Total Project Allocation | |||||
10(1) Department of Environmental Protection |
| |||||
<-11(i) Bucks County |
| |||||
12(A) Flood mitigation, increase resiliency |
| |||||
16Project Allocation | 2,000,000 | |||||
17(Base Project Allocation - $2,000,000) |
| |||||
18(B) Construction and other related costs |
| |||||
21Project Allocation | 750,000 | |||||
22(Base Project Allocation - $750,000) |
| |||||
23(C) Construction and other related costs |
| |||||
26Project Allocation | 50,000 | |||||
27(Base Project Allocation - $50,000) |
| |||||
28(D) Construction, renovation and other |
| |||||
3Project Allocation | 40,000 | |||||
4(Base Project Allocation - $40,000) |
| |||||
5(E) Renovation and other related costs to |
| |||||
8Project Allocation | 30,000 | |||||
9(Base Project Allocation - $30,000) |
| |||||
10(i) <-(ii) Dauphin County |
| |||||
11(A) Construction, infrastructure, |
| |||||
17Project Allocation | 25,000,000 | |||||
| ||||||
20(B) Construction, acquisition, |
| |||||
27Project Allocation | 20,000,000 | |||||
| ||||||
<-30(iii) Delaware County |
| |||||
1(A) Design, construction and related |
| |||||
5Project Allocation | 61,000 | |||||
6(Base Project Allocation - $61,000) |
| |||||
7(B) Construction, infrastructure and |
| |||||
10Project Allocation | 2,000,000 | |||||
11(Base Project Allocation - $2,000,000) |
| |||||
12(ii) <-(iv) Lycoming County |
| |||||
13(A) Construction and related costs for a |
| |||||
15Project Allocation | 3,000,000 | |||||
16(Base Project Allocation - $3,000,000) |
| |||||
<-17(B) Construction, infrastructure, |
| |||||
20Project Allocation | 2,000,000 | |||||
21(Base Project Allocation - $2,000,000) |
| |||||
22(iii) <-(v) Montgomery County |
| |||||
23(A) Construction, infrastructure, |
| |||||
27Project Allocation | 205,000 | |||||
28(Base Project Allocation - $205,000) |
| |||||
<-29(B) Construction and related costs for
1needed to reduce habitual downstream |
| |||||
3Project Allocation | 375,000 | |||||
4(Base Project Allocation - $375,000) |
| |||||
5(C) Acquisition and related costs for the |
| |||||
15Project Allocation | 200,000 | |||||
16(Base Project Allocation - $200,000) |
| |||||
17(D) Acquisition and related costs for the |
| |||||
26Project Allocation | 300,000 | |||||
27(Base Project Allocation - $300,000) |
| |||||
28(vi) Montour County |
| |||||
29(A) Upgrades, renovations and related
1in Danville Borough |
| |||||
2Project Allocation | 3,000,000 | |||||
3(Base Project Allocation - $3,000,000) |
| |||||
4(B) Acquisition, construction, |
| |||||
9Project Allocation | 2,500,000 | |||||
10(Base Project Allocation - $2,500,000) |
| |||||
11(C) Acquisition, construction, |
| |||||
15Project Allocation | 741,000 | |||||
16(Base Project Allocation - $741,000) |
| |||||
17(vii) Philadelphia County |
| |||||
18(A) Acquisition, construction, |
| |||||
24Project Allocation | 250,000 | |||||
25(Base Project Allocation - $250,000) |
|
26Section 8. Itemization of Keystone Recreation, Park and
27Conservation Fund.
28Projects in the category of public improvement projects to be
29constructed by the Department of Conservation and Natural
30Resources, its successors or assigns, and to be financed by
1current revenues of the Keystone Recreation, Park and
2Conservation Fund are hereby itemized, together with their
3respective estimated costs, as follows:
5Project | Total Project Allocation | |||||
| ||||||
8(i) Bald Eagle State Park <-Forest |
| |||||
9(A) Rehabilitate Mid State Trail Tunnel |
| |||||
10Project Allocation | 1,600,000 | |||||
11(Base Project Allocation - $1,600,000) |
| |||||
12(B) Repave Poe Valley Road and Millhiem- |
| |||||
14Project Allocation | 500,000 | |||||
15(Base Project Allocation - $500,000) |
| |||||
16(C) Replace main waterline within park<- |
| |||||
17Project Allocation | 500,000 | |||||
18(Base Project Allocation - $500,000) |
| |||||
<-19(ii) Bald Eagle State Park |
| |||||
20(A) Replace main waterline within park |
| |||||
21Project Allocation | 500,000 | |||||
22(Base Project Allocation - $500,000) |
| |||||
| ||||||
25Project Allocation | 250,000 | |||||
26(Base Project Allocation - $250,000) |
| |||||
27(iii) Black Moshannon State Park |
| |||||
28(A) Rehabilitate park shooting range |
| |||||
29Project Allocation | 400,000 | |||||
30(Base Project Allocation - $400,000) |
| |||||
1(ii) <-(iv) Buchanan State Park |
| |||||
2(A) Construct resource management center, |
| |||||
4Project Allocation | 4,865,000 | |||||
5(Base Project Allocation - $4,865,000) |
| |||||
| ||||||
8Project Allocation | 750,000 | |||||
9(Base Project Allocation - $750,000) |
| |||||
10(iii) <-(v) Caledonia State Park |
| |||||
| ||||||
13Project Allocation | 2,500,000 | |||||
14(Base Project Allocation - $2,500,000) |
| |||||
15(iv) <-(vi) Canoe Creek State Park |
| |||||
16(A) Rehabilitate sewage treatment plant |
| |||||
17Project Allocation | 500,000 | |||||
18(Base Project Allocation - $500,000) |
| |||||
19(v) <-(vii) Codorus State Park |
| |||||
20(A) Replace main boat launch, band shell |
| |||||
23Project Allocation | 450,000 | |||||
24(Base Project Allocation - $450,000) |
| |||||
<-25(viii) Cook Forest State Park |
| |||||
| ||||||
28Project Allocation | 200,000 | |||||
29(Base Project Allocation - $200,000 |
| |||||
30(vi) <-(ix) Delaware Canal State Park |
| |||||
1(A) Replace Lower Limeport Bridge No.2682 |
| |||||
2Project Allocation | 400,000 | |||||
3(Base Project Allocation - $400,000) |
| |||||
4(B) Replace Smithtown Bridge No.3517 |
| |||||
5Project Allocation | 400,000 | |||||
6(Base Project Allocation - $400,000) |
| |||||
| ||||||
9Project Allocation | 750,000 | |||||
10(Base Project Allocation - $750,000) |
| |||||
11(vii) <-(x) Elk State Forest |
| |||||
12(A) Repair HVAC system for district |
| |||||
15Project Allocation | 250,000 | |||||
16(Base Project Allocation - $250,000) |
| |||||
17(viii) <-(xi) Forbes State Forest |
| |||||
18(A) Construct office addition to Negro |
| |||||
20Project Allocation | 500,000 | |||||
21(Base Project Allocation - $500,000) |
| |||||
<-22(xii) Forbes State Park |
| |||||
23(A) Construct pole building for storage |
| |||||
24Project Allocation | 600,000 | |||||
25(Base Project Allocation - $600,000 |
| |||||
26(xiii) Gallitzan State Park |
| |||||
27(A) Remediate park skeet range |
| |||||
28Project Allocation | 200,000 | |||||
29(Base Project Allocation - $200,000 |
| |||||
30(ix) <-(xiv) Greenwood Furnace State Park |
| |||||
1(A) Rehabilitate maintenance building |
| |||||
2Project Allocation | 550,000 | |||||
3(Base Project Allocation - $550,000) |
| |||||
<-4(xv) Hills Creek State Park |
| |||||
5(A) Replace culvert at Main Park Road |
| |||||
6Project Allocation | 250,000 | |||||
7(Base Project Allocation - $250,000 |
| |||||
8(x) <-(xvi) Keystone State Park |
| |||||
| ||||||
11Project Allocation | 300,000 | |||||
12(Base Project Allocation - $300,000) |
| |||||
13(xi) <-(xvii) Lackawanna State Forest |
| |||||
14(A) Renovate park office and foyer |
| |||||
15Project Allocation<- | 750,000 | |||||
<-16Project Allocation | 1,300,000 | |||||
<- | ||||||
19(B) Remove Olyphant Dam No.2 |
| |||||
20Project Allocation | 800,000 | |||||
21(Base Project Allocation - $800,000) |
| |||||
22(xii) <-(xviii) Little Buffalo State Park |
| |||||
23(A) Replace campground shower house |
| |||||
24Project Allocation | 500,000 | |||||
25(Base Project Allocation - $500,000) |
| |||||
<-26(xix) Michaux State Forest |
| |||||
| ||||||
29Project Allocation | 300,000 | |||||
30(Base Project Allocation - $300,000) |
| |||||
1(xiii) <-(xx) Moraine State Park |
| |||||
| ||||||
4Project Allocation | 500,000 | |||||
5(Base Project Allocation - $500,000) |
| |||||
<-6(xxi) Park Region 3 |
| |||||
| ||||||
9Project Allocation | 275,000 | |||||
10(Base Project Allocation - $275,000) |
| |||||
11(xxii) Pymatuning State Park |
| |||||
| ||||||
14Project Allocation | 300,000 | |||||
15(Base Project Allocation - $300,000) |
| |||||
16(xiv) <-(xxiii) Rothrock State Forest |
| |||||
17(A) Rehabilitate district office parking |
| |||||
19Project Allocation | 250,000 | |||||
20(Base Project Allocation - $250,000) |
| |||||
| ||||||
23Project Allocation | 250,000 | |||||
24(Base Project Allocation - $250,000) |
| |||||
25(xxiv) Sproul State Forest |
| |||||
26(A) Investigate geothermal heating system |
| |||||
27Project Allocation | 200,000 | |||||
28(Base Project Allocation - $200,000) |
| |||||
29(xv) <-(xxv) Tuscarora State Forest |
| |||||
30(A) Rehabilitate Bryner Maintenance
1headquarters, including infrastructure |
| |||||
2Project Allocation | 1,200,000 | |||||
3(Base Project Allocation - $1,200,000) |
| |||||
| ||||||
6Project Allocation | 250,000 | |||||
7(Base Project Allocation - $250,000) |
| |||||
8(xvi) <-(xxvi) Weiser State Forest |
| |||||
9(A) Rehabilitate Haldeman Maintenance |
| |||||
11Project Allocation | 1,200,000 | |||||
12(Base Project Allocation - $1,200,000) |
|
13Section 9. Itemization of Environmental Stewardship Fund.
14The individual projects to be developed by the Department of
15Conservation and Natural Resources, its successors or assigns,
16and to be financed from current revenues of the Environmental
17Stewardship Fund are hereby itemized, together with their
18respective estimated costs, as follows:
20Project | Total Project Allocation | |||||
| ||||||
<-23(i) Bald Eagle State Forest |
| |||||
24(A) Construct a new pole building at the |
| |||||
26Project Allocation | 350,000 | |||||
27(Base Project Allocation - $350,000) |
| |||||
28(i) <-(i.1) Buchanan State Forest |
| |||||
29(A) Rehabilitate Siding <-Sidling Hill
1infrastructure |
| |||||
2Project Allocation | 750,000 | |||||
3(Base Project Allocation - $750,000) |
| |||||
| ||||||
6Project Allocation | 200,000 | |||||
7(Base Project Allocation - $200,000 |
| |||||
8(ii) Colonel Denning State Park |
| |||||
9(A) Rehabilitate comfort station with new |
| |||||
11Project Allocation | 1,000,000 | |||||
12(Base Project Allocation - $1,000,000) |
| |||||
<-13(ii.1) Delaware Canal State Park |
| |||||
14(A) Replace Smithtown Bridge #4 |
| |||||
15Project Allocation | 400,000 | |||||
16(Base Project Allocation - $400,000) |
| |||||
17(B) Replace Redfield Road Bridge |
| |||||
18Project Allocation | 450,000 | |||||
19(Base Project Allocation - $450,000) |
| |||||
20(iii) Frances Slocum State Park |
| |||||
21(A) Rehabilitate sewage connection to |
| |||||
23Project Allocation | 1,050,000 | |||||
24(Base Project Allocation - $1,050,000) |
| |||||
| ||||||
27Project Allocation | 1,600,000 | |||||
28(Base Project Allocation - $1,600,000) |
| |||||
29(iv) Greenwood Furnace State Park |
| |||||
30(A) Replace water line from reservoir to
1mansion |
| |||||
2Project Allocation | 400,000 | |||||
3(Base Project Allocation - $400,000) |
| |||||
4(v) Laurel Hill State Park |
| |||||
5(A) Rehabilitate STP and dredge lagoons |
| |||||
6Project Allocation | 540,000 | |||||
7(Base Project Allocation - $540,000) |
| |||||
<-8(v.1) Lehigh Gorge State Park |
| |||||
9(A) Repair the Glen Onoko Bridge Bearings |
| |||||
10Project Allocation | 575,000 | |||||
11(Base Project Allocation - $575,000) |
| |||||
12(vi) Moshannon State Forest |
| |||||
13(A) Construct groomer storage building at 14Black Mountain headquarters |
| |||||
15Project Allocation | 250,000 | |||||
16(Base Project Allocation - $250,000) |
| |||||
<-17(vi.1) Nockamixon State Park |
| |||||
18(A) Rehabilitate and pave various |
| |||||
20Project Allocation | 1,500,000 | |||||
21(Base Project Allocation - $1,500,000) |
| |||||
22(vii) Park Region No.2 |
| |||||
| ||||||
25Project Allocation | 600,000 | |||||
26(Base Project Allocation - $600,000) |
| |||||
27(viii) Prince Gallitzin State Park |
| |||||
28(A) Rehabilitate parking, including |
| |||||
30Project Allocation | 1,000,000 | |||||
1(Base Project Allocation - $1,000,000) |
| |||||
2(ix) Poe Valley State Park |
| |||||
3(A) Replace park office |
| |||||
4Project Allocation | 750,000 | |||||
5(Base Project Allocation - $750,000) |
| |||||
<-6(ix.1) Presque Isle State Park |
| |||||
| ||||||
9Project Allocation | 400,000 | |||||
10(Base Project Allocation - $400,000) |
| |||||
11(ix.2) Reed Gap State Park |
| |||||
12(A) Demolish sewage treatment plant and |
| |||||
14Project Allocation | 375,000 | |||||
15(Base Project Allocation - $375,000) |
| |||||
16(x) Ridley Creek State Park |
| |||||
17(A) Construct new equestrian building |
| |||||
18Project Allocation | 900,000 | |||||
19(Base Project Allocation - $900,000) |
| |||||
20(xi) Rothrock State Forest |
| |||||
| ||||||
23Project Allocation | 250,000 | |||||
24(Base Project Allocation - $250,000) |
| |||||
25(xii) Sproul State Forest |
| |||||
26(A) C<-onstruct pole building at district |
| |||||
28Project Allocation | 250,000 | |||||
29(Base Project Allocation - $250,000) |
| |||||
<-30(xiii) Susquehannock State Park |
| |||||
1(A) Pave main park road |
| |||||
2Project Allocation | 250,000 | |||||
3(Base Project Allocation - $250,000) |
|
4Section 10. Itemization of State forestry bridge projects.
5Projects in the category of State forestry bridge projects to
6be constructed by the Department of Conservation and Natural
7Resources, its successors or assigns, and to be financed by oil
8company franchise tax revenues under 75 Pa.C.S. § 9502(a)(2)(iv)
9(related to imposition of tax) are hereby itemized, together
10with their respective estimated costs, as follows:
12Project | Total Project Allocation | |||||
13(1) Cameron County Cambria County | <- | |||||
14(i) Gallitzan State Forest | <- | |||||
| ||||||
17Project Allocation | 200,000 | |||||
18(Base Project Allocation - $200,000) |
| |||||
19(1.1) Cameron County |
| |||||
20(i) Elk State Forest |
| |||||
21(A) Replace Fee Hollow Road structure |
| |||||
23Project Allocation | 200,000 | |||||
24(Base Project Allocation - $200,000) |
| |||||
25(B) Replace Vantassel culvert |
| |||||
26Project Allocation | 200,000 | |||||
27(Base Project Allocation - $200,000) |
| |||||
<-28(C) Replace Bridge No.13-9008 at East |
| |||||
30Project Allocation | 200,000 | |||||
1(Base Project Allocation - $200,000) |
| |||||
2(D) Replace Dents Run Road over Dents Run |
| |||||
3Project Allocation | 200,000 | |||||
4(Base Project Allocation - $200,000) |
| |||||
| ||||||
7Project Allocation | 200,000 | |||||
8(Base Project Allocation - $200,000) |
| |||||
| ||||||
11Project Allocation | 200,000 | |||||
12(Base Project Allocation - $200,000) |
| |||||
13(G) Replace Bridge No.13-9016, No.13-9019 |
| |||||
16Project Allocation | 600,000 | |||||
17(Base Project Allocation - $600,000) |
| |||||
18(2) Clearfield County |
| |||||
19(i) Moshannon State Forest |
| |||||
| ||||||
22Project Allocation | 200,000 | |||||
23(Base Project Allocation - $200,000) |
| |||||
24(B) Replace Medix Grade Road structure |
| |||||
26Project Allocation | 200,000 | |||||
27(Base Project Allocation - $200,000) |
| |||||
<-28(C) Replace Bridge No.09-0038 on Gordon |
| |||||
30Project Allocation | 200,000 | |||||
1(Base Project Allocation - $200,000) |
| |||||
2(D) Replace Bridge No.09-0039 on Harley |
| |||||
4Project Allocation | 200,000 | |||||
5(Base Project Allocation - $200,000) |
| |||||
6(E) Replace Bridge No.09-0040 on |
| |||||
9Project Allocation | 200,000 | |||||
10(Base Project Allocation - $200,000) |
| |||||
11(ii) Sproul State Forest |
| |||||
| ||||||
14Project Allocation | 200,000 | |||||
15(Base Project Allocation - $200,000) |
| |||||
16(B) Replace Bridge A, No.10-0069 on Cole |
| |||||
18Project Allocation | 200,000 | |||||
19(Base Project Allocation - $200,000) |
| |||||
| ||||||
22Project Allocation | 200,000 | |||||
23(Base Project Allocation - $200,000) |
| |||||
24(3) Clinton County |
| |||||
25(i) Sproul State Park |
| |||||
| ||||||
28Project Allocation | 200,000 | |||||
29(Base Project Allocation - $200,000) |
| |||||
30(4) Franklin County |
| |||||
1(i) Michaux State Forest |
| |||||
| ||||||
4Project Allocation | 200,000 | |||||
5(Base Project Allocation - $200,000) |
| |||||
6(5) Huntingdon County |
| |||||
7(i) Rothrock State Forest |
| |||||
8(A) Replace Laurel Run Road structure |
| |||||
10Project Allocation | 200,000 | |||||
11(Base Project Allocation - $200,000) |
| |||||
<-12(B) Replace two box culverts at Boal Gap |
| |||||
15Project Allocation | 400,000 | |||||
16(Base Project Allocation - $400,000) |
| |||||
17(C) Replace Bridge No.05-0029 on Spruce |
| |||||
19Project Allocation | 200,000 | |||||
20(Base Project Allocation - $200,000) |
| |||||
21(D) Replace Bridge No.05-0030 on Cinklin |
| |||||
23Project Allocation | 200,000 | |||||
24(Base Project Allocation - $200,000) |
| |||||
25(6) Lycoming County |
| |||||
26(i) Tiadaghton State Forest |
| |||||
| ||||||
29Project Allocation | 350,000 | |||||
30(Base Project Allocation - $350,000) |
| |||||
| ||||||
3Project Allocation | 200,000 | |||||
4(Base Project Allocation - $200,000) |
| |||||
5(7) Monroe County |
| |||||
6(i) Delaware State Forest |
| |||||
| ||||||
9Project Allocation | 200,000 | |||||
10(Base Project Allocation - $200,000) |
| |||||
| ||||||
13Project Allocation | 400,000 | |||||
14(Base Project Allocation - $400,000) |
| |||||
15(8) Perry County |
| |||||
16(i) Tuscarora State Forest |
| |||||
17(A) Replace Spectacle Gap Road structure |
| |||||
20Project Allocation<- | 300,000 | |||||
21(Base Project Allocation - $300,000) |
| |||||
22(9) Tioga County |
| |||||
23(i) Tioga State Forest |
| |||||
24(A) Replace Painter Leetonia Road |
| |||||
26Project Allocation | 320,000 | |||||
27(Base Project Allocation - $320,000) |
| |||||
<-28Project Allocation | 350,000 | |||||
29(Base Project Allocation - $350,000) |
| |||||
30(9) Potter County |
| |||||
1(i) Susquehannock State Forest |
| |||||
2(A) Replace Bridge No.15-9000 on Lebo |
| |||||
5Project Allocation | 200,000 | |||||
6(Base Project Allocation - $200,000) |
| |||||
7(10) Schuylkill County |
| |||||
8(i) Weiser State Forest |
| |||||
9(A) Construct south branch trail bridge |
| |||||
11Project Allocation | 300,000 | |||||
12(Base Project Allocation - $300,000) |
| |||||
13(11) Somerset County |
| |||||
14(i) Forbes State Forest |
| |||||
| ||||||
17Project Allocation | 200,000 | |||||
18(Base Project Allocation - $200,000) |
| |||||
19(12) Sullivan County |
| |||||
20(i) Loyalsock State Forest |
| |||||
21(A) Replace Walker Road structure over |
| |||||
23Project Allocation | 200,000 | |||||
24(Base Project Allocation - $200,000) |
| |||||
| ||||||
27Project Allocation | 300,000 | |||||
28(Base Project Allocation - $300,000) |
| |||||
| ||||||
1Project Allocation | 200,000 | |||||
2(Base Project Allocation - $200,000) |
| |||||
3(13) Tioga County |
| |||||
4(i) Tioga State Forest |
| |||||
5(A) Replace Painter Leetonia Road |
| |||||
7Project Allocation | 320,000 | |||||
8(Base Project Allocation - $320,000) |
| |||||
9(14) Union County |
| |||||
10(i) Bald Eagle State Forest |
| |||||
11(A) Replace Bridge No.07-0001 at Havice |
| |||||
13Project Allocation | 320,000 | |||||
14(Base Project Allocation - $320,000) |
| |||||
15(B) Replace Bridge No.07-0025 at Swift |
| |||||
17Project Allocation | 320,000 | |||||
18(Base Project Allocation - $320,000) |
| |||||
19(C) Replace Bridge No.07-9006 at Engle |
| |||||
21Project Allocation | 200,000 | |||||
22(Base Project Allocation - $200,000) |
|
23Section 11. Itemization of Motor License Fund projects.
24Projects in the category of Motor License Fund projects to be
25constructed by the Department of Transportation, its successors
26or assigns, and to be financed by current revenues are hereby
27itemized, together with their respective estimated costs, as
28follows:
30Project | Total Project Allocation | |||||
1(1) Adams County |
| |||||
2(i) Adams County Maintenance Facility |
| |||||
3(A) Construct new storage building, |
| |||||
6Project Allocation | 3,000,000 | |||||
7(Base Project Allocation - $1,750,000) |
| |||||
8(Land Allocation - $750,000) |
| |||||
9(Design & Contingencies - $500,000) |
| |||||
10(2) Allegheny County |
| |||||
11(i) Allegheny County Maintenance Facility |
| |||||
12(A) Construct new storage building, |
| |||||
15Project Allocation | 3,000,000 | |||||
16(Base Project Allocation - $2,400,000) |
| |||||
17(Land Allocation - $100,000) |
| |||||
18(Design & Contingencies - $500,000) |
| |||||
19(ii) Allegheny County Maintenance Garage |
| |||||
20(A) Develop new stockpile, including site |
| |||||
23Project Allocation | 13,000,000 | |||||
| ||||||
26(Land Allocation - $2,000,000) |
| |||||
27(Design & Contingencies - $500,000) |
| |||||
28(iii) Allegheny County Stockpile Facility |
| |||||
| ||||||
1Project Allocation | 1,000,000 | |||||
2(Base Project Allocation - $900,000) |
| |||||
3(Design & Contingencies - $100,000) |
| |||||
4(3) Armstrong County |
| |||||
5(i) Armstrong County Maintenance Facility |
| |||||
6(A) Develop new stockpile, including site |
| |||||
9Project Allocation | 3,000,000 | |||||
10(Base Project Allocation - $1,750,000) |
| |||||
11(Land Allocation - $750,000) |
| |||||
12(Design & Contingencies - $500,000) |
| |||||
13(4) Beaver County |
| |||||
14(i) Beaver County Maintenance Facility |
| |||||
15(A) Construct new storage building, |
| |||||
18Project Allocation | 3,000,000 | |||||
19(Base Project Allocation - $2,400,000) |
| |||||
20(Land Allocation - $100,000) |
| |||||
21(Design & Contingencies - $500,000) |
| |||||
22(ii) Beaver County Maintenance Garage |
| |||||
23(A) Construct new stockpile, including |
| |||||
26Project Allocation | 2,200,000 | |||||
27(Base Project Allocation - $2,000,000) |
| |||||
28(Land Allocation - $100,000) |
| |||||
29(Design & Contingencies - $100,000) |
| |||||
30(5) Bedford County |
| |||||
1(i) Bedford County Maintenance Facility |
| |||||
2(A) Construct new stockpile, including |
| |||||
5Project Allocation | 3,000,000 | |||||
6(Base Project Allocation - $2,400,000) |
| |||||
7(Land Allocation - $100,000) |
| |||||
8(Design & Contingencies - $500,000) |
| |||||
9(ii) Bedford County Stockpile Facility |
| |||||
| ||||||
12Project Allocation | 1,000,000 | |||||
13(Base Project Allocation - $900,000) |
| |||||
14(Design & Contingencies - $100,000) |
| |||||
15(6) Blair County |
| |||||
16(i) Blair County Stockpile Facility |
| |||||
| ||||||
19Project Allocation | 1,000,000 | |||||
20(Base Project Allocation - $900,000) |
| |||||
21(Design & Contingencies - $100,000) |
| |||||
22(7) Berks County |
| |||||
23(i) Berks County Maintenance Facility |
| |||||
24(A) Construct new storage building, |
| |||||
27Project Allocation | 3,000,000 | |||||
28(Base Project Allocation - $1,750,000) |
| |||||
29(Land Allocation - $750,000) |
| |||||
30(Design & Contingencies - $500,000) |
| |||||
1(8) Bucks County |
| |||||
2(i) Bucks County Maintenance Facility |
| |||||
3(A) Construct new storage building, |
| |||||
6Project Allocation | 3,000,000 | |||||
7(Base Project Allocation - $1,750,000) |
| |||||
8(Land Allocation - $750,000) |
| |||||
9(Design & Contingencies - $500,000) |
| |||||
10(9) Butler County |
| |||||
11(i) Butler County Maintenance Facility |
| |||||
12(A) Develop new stockpile, including site |
| |||||
15Project Allocation | 3,000,000 | |||||
16(Base Project Allocation - $1,750,000) |
| |||||
17(Land Allocation - $750,000) |
| |||||
18(Design & Contingencies - $500,000) |
| |||||
19(ii) Butler County Stockpile Facility |
| |||||
20(A) Construct new salt storage building |
| |||||
21Project Allocation | 500,000 | |||||
22(Base Project Allocation - $450,000) |
| |||||
23(Design & Contingencies - $50,000) |
| |||||
24(10) Cambria County |
| |||||
25(i) Cambria County Maintenance Garage |
| |||||
26(A) Construct new stockpile, including |
| |||||
29Project Allocation | 15,000,000 | |||||
30(Base Project Allocation -
1$12,500,000) |
| |||||
2(Land Allocation - $2,000,000) |
| |||||
3(Design & Contingencies - $500,000) |
| |||||
4(11) Cameron County |
| |||||
5(i) Cameron County Bridgebeam Facility |
| |||||
6(A) Renovate and expand current facility, |
| |||||
10Project Allocation | 3,000,000 | |||||
11(Base Project Allocation - $2,750,000) |
| |||||
12(Design & Contingencies - $250,000) |
| |||||
13(ii) Cameron County Maintenance Facility |
| |||||
14(A) Construct new storage building, |
| |||||
17Project Allocation | 3,000,000 | |||||
18(Base Project Allocation - $1,750,000) |
| |||||
19(Land Allocation - $750,000) |
| |||||
20(Design & Contingencies - $500,000) |
| |||||
21(iii) Cameron County Stockpile Facility |
| |||||
22(A) Construct new salt storage building |
| |||||
23Project Allocation | 500,000 | |||||
24(Base Project Allocation - $450,000) |
| |||||
25(Design & Contingencies - $50,000) |
| |||||
26(12) Carbon County |
| |||||
27(i) Carbon County Maintenance Facility |
| |||||
28(A) Construct new storage building, |
| |||||
1Project Allocation | 3,000,000 | |||||
2(Base Project Allocation - $1,750,000) |
| |||||
3(Land Allocation - $750,000) |
| |||||
4(Design & Contingencies - $500,000) |
| |||||
5(13) Centre County |
| |||||
6(i) Centre County Maintenance Facility |
| |||||
7(A) Construct new storage building, |
| |||||
10Project Allocation | 3,000,000 | |||||
11(Base Project Allocation - $1,750,000) |
| |||||
12(Land Allocation - $750,000) |
| |||||
13(Design & Contingencies - $500,000) |
| |||||
14(ii) Centre County Stockpile Facility |
| |||||
15(A) Construct new salt storage building |
| |||||
16Project Allocation | 500,000 | |||||
17(Base Project Allocation - $450,000) |
| |||||
18(Design & Contingencies - $50,000) |
| |||||
19(14) Chester County |
| |||||
20(i) Chester County Maintenance Facility |
| |||||
21(A) Construct new storage building, |
| |||||
24Project Allocation | 3,000,000 | |||||
25(Base Project Allocation - $1,750,000) |
| |||||
26(Land Allocation - $750,000) |
| |||||
27(Design & Contingencies - $500,000) |
| |||||
28(15) Clarion County |
| |||||
29(i) Clarion County Maintenance Garage |
| |||||
30(A) Construct new stockpile, including
1site purchase, development, design and |
| |||||
3Project Allocation | 15,000,000 | |||||
| ||||||
6(Land Allocation - $2,000,000) |
| |||||
7(Design & Contingencies - $500,000) |
| |||||
8(ii) Clarion County Maintenance Facility |
| |||||
9(A) Construct new stockpile, including |
| |||||
12Project Allocation | 3,000,000 | |||||
13(Base Project Allocation - $1,750,000) |
| |||||
14(Land Allocation - $750,000) |
| |||||
15(Design & Contingencies - $500,000) |
| |||||
16(iii) Clarion County Stockpile Facility |
| |||||
17(A) Construct new salt storage building |
| |||||
18Project Allocation | 500,000 | |||||
19(Base Project Allocation - $450,000) |
| |||||
20(Design & Contingencies - $50,000) |
| |||||
21(16) Clinton County |
| |||||
22(i) Clinton County Maintenance Facility |
| |||||
23(A) Renovate and expand storage building, |
| |||||
27Project Allocation | 2,500,000 | |||||
28(Base Project Allocation - $2,000,000) |
| |||||
29(Design & Contingencies - $500,000) |
| |||||
30(B) Construct new storage building, |
| |||||
3Project Allocation | 3,000,000 | |||||
4(Base Project Allocation - $1,750,000) |
| |||||
5(Land Allocation - $750,000) |
| |||||
6(Design & Contingencies - $500,000) |
| |||||
7(17) Columbia County |
| |||||
8(i) Columbia County Maintenance Facility |
| |||||
9(A) Develop new stockpile, including site |
| |||||
12Project Allocation | 3,000,000 | |||||
13(Base Project Allocation - $1,750,000) |
| |||||
14(Land Allocation - $750,000) |
| |||||
15(Design & Contingencies - $500,000) |
| |||||
16(18) Crawford County |
| |||||
17(i) Crawford County Bridgebeam Facility |
| |||||
18(A) Renovate and expand current facility, |
| |||||
22Project Allocation | 3,000,000 | |||||
23(Base Project Allocation - $2,750,000) |
| |||||
24(Design & Contingencies - $250,000) |
| |||||
25(ii) Crawford County Maintenance Facility |
| |||||
26(A) Construct new storage building, |
| |||||
29Project Allocation | 3,000,000 | |||||
30(Base Project Allocation - $1,750,000) |
| |||||
1(Land Allocation - $750,000) |
| |||||
2(Design & Contingencies - $500,000) |
| |||||
3(iii) Crawford County Stockpile Facility |
| |||||
4(A) Construct new salt storage building |
| |||||
5Project Allocation | 500,000 | |||||
6(Base Project Allocation - $450,000) |
| |||||
7(Design & Contingencies - $50,000) |
| |||||
8(19) Cumberland County |
| |||||
9(i) Cumberland County Maintenance Facility |
| |||||
10(A) Construct new storage building, |
| |||||
13Project Allocation | 3,000,000 | |||||
14(Base Project Allocation - $1,750,000) |
| |||||
15(Land Allocation - $750,000) |
| |||||
16(Design & Contingencies - $500,000) |
| |||||
17(20) Dauphin County |
| |||||
18(i) Dauphin County Maintenance Facility |
| |||||
19(A) Construct new storage building, |
| |||||
22Project Allocation | 3,000,000 | |||||
23(Base Project Allocation - $1,750,000) |
| |||||
24(Land Allocation - $750,000) |
| |||||
25(Design & Contingencies - $500,000) |
| |||||
26(21) Delaware County |
| |||||
27(i) Delaware County Maintenance Facility |
| |||||
28(A) Construct new storage building, |
| |||||
1Project Allocation | 3,000,000 | |||||
2(Base Project Allocation - $1,750,000) |
| |||||
3(Land Allocation - $750,000) |
| |||||
4(Design & Contingencies - $500,000) |
| |||||
5(22) Elk County |
| |||||
6(i) Elk County Maintenance Garage |
| |||||
7(A) Renovate and expand storage building, |
| |||||
11Project Allocation | 2,500,000 | |||||
12(Base Project Allocation - $2,000,000) |
| |||||
13(Design & Contingencies - $500,000) |
| |||||
14(ii) Elk County Maintenance Facility |
| |||||
15(A) Develop new stockpile, including site |
| |||||
18Project Allocation | 3,000,000 | |||||
19(Base Project Allocation - $1,750,000) |
| |||||
20(Land Allocation - $750,000) |
| |||||
21(Design & Contingencies - $500,000) |
| |||||
22(23) Erie County |
| |||||
23(i) Erie County Maintenance Garage |
| |||||
24(A) Construct new storage building, |
| |||||
27Project Allocation | 15,000,000 | |||||
| ||||||
30(Land Allocation - $2,000,000) |
| |||||
1(Design & Contingencies - $500,000) |
| |||||
2(ii) Erie County Stockpile Facility |
| |||||
3(A) Construct new salt storage building |
| |||||
4Project Allocation | 500,000 | |||||
5(Base Project Allocation - $450,000) |
| |||||
6(Design & Contingencies - $50,000) |
| |||||
7(24) Forest County |
| |||||
8(i) Forest County Maintenance Facility |
| |||||
9(A) Construct new storage building, |
| |||||
12Project Allocation | 3,000,000 | |||||
13(Base Project Allocation - $1,750,000) |
| |||||
14(Land Allocation - $750,000) |
| |||||
15(Design & Contingencies - $500,000) |
| |||||
16(25) Franklin County |
| |||||
17(i) Franklin County Maintenance Facility |
| |||||
18(A) Construct new storage building, |
| |||||
21Project Allocation | 3,000,000 | |||||
22(Base Project Allocation - $1,750,000) |
| |||||
23(Land Allocation - $750,000) |
| |||||
24(Design & Contingencies - $500,000) |
| |||||
25(26) Fulton County |
| |||||
26(i) Fulton County Maintenance Facility |
| |||||
27(A) Construct new storage building, |
| |||||
30Project Allocation | 3,000,000 | |||||
1(Base Project Allocation - $2,400,000) |
| |||||
2(Land Allocation - $100,000) |
| |||||
3(Design & Contingencies - $500,000) |
| |||||
4(ii) Fulton County Maintenance Garage |
| |||||
5(A) Develop new stockpile, including site |
| |||||
8Project Allocation | 16,000,000 | |||||
| ||||||
11(Land Allocation - $2,000,000) |
| |||||
12(Design & Contingencies - $500,000) |
| |||||
13(iii) Fulton County Stockpile Facility |
| |||||
| ||||||
16Project Allocation | 1,000,000 | |||||
17(Base Project Allocation - $900,000) |
| |||||
18(Design & Contingencies - $100,000) |
| |||||
19(27) Greene County |
| |||||
20(i) Greene County Maintenance Facility |
| |||||
21(A) Construct new storage building, |
| |||||
24Project Allocation | 3,000,000 | |||||
25(Base Project Allocation - $2,400,000) |
| |||||
26(Land Allocation - $100,000) |
| |||||
27(Design & Contingencies - $500,000) |
| |||||
28(ii) Green County Maintenance Garage |
| |||||
29(A) Construct new stockpile, including
1construction of all required buildings |
| |||||
2Project Allocation | 15,000,000 | |||||
| ||||||
5(Land Allocation - $2,000,000) |
| |||||
6(Design & Contingencies - $500,000) |
| |||||
7(iii) Greene County Stockpile Facility |
| |||||
| ||||||
10Project Allocation | 1,000,000 | |||||
11(Base Project Allocation - $900,000) |
| |||||
12(Design & Contingencies - $100,000) |
| |||||
13(28) Huntingdon County |
| |||||
14(i) Huntingdon County Maintenance Facility |
| |||||
15(A) Construct new storage building, |
| |||||
18Project Allocation | 3,000,000 | |||||
19(Base Project Allocation - $2,400,000) |
| |||||
20(Land Allocation - $100,000) |
| |||||
21(Design & Contingencies - $500,000) |
| |||||
22(29) Indiana County |
| |||||
23(i) Indiana County Maintenance Garage |
| |||||
24(A) Develop new stockpile, including site |
| |||||
27Project Allocation | 15,000,000 | |||||
| ||||||
30(Land Allocation - $2,000,000) |
| |||||
1(Design & Contingencies - $500,000) |
| |||||
2(ii) Indiana County Stockpile Facility |
| |||||
3(A) Construct new salt storage building |
| |||||
4Project Allocation | 500,000 | |||||
5(Base Project Allocation - $450,000) |
| |||||
6(Design & Contingencies - $50,000) |
| |||||
7(30) Jefferson County |
| |||||
8(i) Jefferson County Maintenance Facility |
| |||||
9(A) Construct new stockpile, including |
| |||||
12Project Allocation | 3,000,000 | |||||
13(Base Project Allocation - $1,750,000) |
| |||||
14(Land Allocation - $750,000) |
| |||||
15(Design & Contingencies - $500,000) |
| |||||
16(ii) Jefferson County Maintenance Garage |
| |||||
17(A) Construct new stockpile, including 19construction of all required buildings |
| |||||
20Project Allocation | 15,000,000 | |||||
| ||||||
23(Land Allocation - $2,000,000) |
| |||||
24(Design & Contingencies - $500,000) |
| |||||
25(iii) Jefferson County Stockpile Facility |
| |||||
26(A) Construct new salt storage building |
| |||||
27Project Allocation | 500,000 | |||||
28(Base Project Allocation - $450,000) |
| |||||
29(Design & Contingencies - $50,000) |
| |||||
30(31) Juniata County |
| |||||
1(i) Juniata County Maintenance Facility |
| |||||
2(A) Construct new stockpile, including |
| |||||
5Project Allocation | 3,000,000 | |||||
6(Base Project Allocation - $1,750,000) |
| |||||
7(Land Allocation - $750,000) |
| |||||
8(Design & Contingencies - $500,000) |
| |||||
9(ii) Juniata County Maintenance Garage |
| |||||
10(A) Renovate and expand storage building, |
| |||||
14Project Allocation | 15,000,000 | |||||
| ||||||
17(Land Allocation - $2,000,000) |
| |||||
18(Design & Contingencies - $500,000) |
| |||||
19(iii) Juniata County Stockpile Facility |
| |||||
20(A) Construct new salt storage building |
| |||||
21Project Allocation | 500,000 | |||||
22(Base Project Allocation - $450,000) |
| |||||
23(Design & Contingencies - $50,000) |
| |||||
24(32) Lackawanna County |
| |||||
25(i) Lackawanna County Maintenance Facility |
| |||||
26(A) Construct new storage building, |
| |||||
29Project Allocation | 3,000,000 | |||||
30(Base Project Allocation - $1,750,000) |
| |||||
1(Land Allocation - $750,000) |
| |||||
2(Design & Contingencies - $500,000) |
| |||||
3(33) Lancaster County |
| |||||
4(i) Lancaster County Maintenance Facility |
| |||||
5(A) Construct new storage building, |
| |||||
8Project Allocation | 3,000,000 | |||||
9(Base Project Allocation - $1,750,000) |
| |||||
10(Land Allocation - $750,000) |
| |||||
11(Design & Contingencies - $500,000) |
| |||||
12(34) Lawrence County |
| |||||
13(i) Lawrence County Stockpile Facility |
| |||||
| ||||||
16Project Allocation | 1,000,000 | |||||
17(Base Project Allocation - $900,000) |
| |||||
18(Design & Contingencies - $100,000) |
| |||||
19(35) Lebanon County |
| |||||
20(i) Lebanon County Maintenance Facility |
| |||||
21(A) Construct new storage building, |
| |||||
24Project Allocation | 3,000,000 | |||||
25(Base Project Allocation - $1,750,000) |
| |||||
26(Land Allocation - $750,000) |
| |||||
27(Design & Contingencies - $500,000) |
| |||||
28(36) Lehigh County |
| |||||
29(i) Lehigh County Maintenance Facility |
| |||||
30(A) Construct new storage building, |
| |||||
3Project Allocation | 3,000,000 | |||||
4(Base Project Allocation - $1,750,000) |
| |||||
5(Land Allocation - $750,000) |
| |||||
6(Design & Contingencies - $500,000) |
| |||||
7(37) Lycoming County |
| |||||
8(i) Lycoming County Maintenance Facility |
| |||||
9(A) Construct new stockpile, including |
| |||||
12Project Allocation | 3,000,000 | |||||
13(Base Project Allocation - $1,750,000) |
| |||||
14(Land Allocation - $750,000) |
| |||||
15(Design & Contingencies - $500,000) |
| |||||
16(38) McKean County |
| |||||
17(i) McKean County Maintenance Facility |
| |||||
18(A) Construct new storage building, |
| |||||
21Project Allocation | 3,000,000 | |||||
22(Base Project Allocation - $1,750,000) |
| |||||
23(Land Allocation - $750,000) |
| |||||
24(Design & Contingencies - $500,000) |
| |||||
25(ii) McKean County Maintenance Garage |
| |||||
26(A) Construct new stockpile, including |
| |||||
29Project Allocation | 14,000,000 | |||||
30(Base Project Allocation -
1$12,500,000) |
| |||||
2(Land Allocation - $1,000,000) |
| |||||
3(Design & Contingencies - $500,000) |
| |||||
4(39) Mercer County |
| |||||
5(i) Mercer County Bridgebeam Facility |
| |||||
6(A) Renovate and expand current facility, |
| |||||
10Project Allocation | 3,000,000 | |||||
11(Base Project Allocation - $2,750,000) |
| |||||
12(Design & Contingencies - $250,000) |
| |||||
13(40) Mifflin County |
| |||||
14(i) Mifflin County Maintenance Facility |
| |||||
15(A) Construct new stockpile, including |
| |||||
18Project Allocation | 3,000,000 | |||||
19(Base Project Allocation - $1,750,000) |
| |||||
20(Land Allocation - $750,000) |
| |||||
21(Design & Contingencies - $500,000) |
| |||||
22(ii) Mifflin County Stockpile Facility |
| |||||
23(A) Construct new salt storage building |
| |||||
24Project Allocation | 500,000 | |||||
25(Base Project Allocation - $450,000) |
| |||||
26(Design & Contingencies - $50,000) |
| |||||
27(41) Monroe County |
| |||||
28(i) Monroe County Maintenance Facility |
| |||||
29(A) Construct new storage building,
1design and site work |
| |||||
2Project Allocation | 3,000,000 | |||||
3(Base Project Allocation - $1,750,000) |
| |||||
4(Land Allocation - $750,000) |
| |||||
5(Design & Contingencies - $500,000) |
| |||||
6(42) Montgomery County |
| |||||
7(i) Montgomery County 6-0 Parking Garage |
| |||||
| ||||||
10Project Allocation | 4,000,000 | |||||
11(Base Project Allocation - $3,600,000) |
| |||||
12(Design & Contingencies - $400,000) |
| |||||
13(ii) Montgomery County 6-0 District Office |
| |||||
14(A) Install standby generator capable of |
| |||||
16Project Allocation | 2,500,000 | |||||
17(Base Project Allocation - $2,250,000) |
| |||||
18(Design & Contingencies - $250,000) |
| |||||
19(iii) Montgomery County Maintenance Facility |
| |||||
20(A) Construct new storage building, |
| |||||
23Project Allocation | 3,000,000 | |||||
24(Base Project Allocation - $1,750,000) |
| |||||
25(Land Allocation - $750,000) |
| |||||
26(Design & Contingencies - $500,000) |
| |||||
27(43) Montour County |
| |||||
28(i) Montour County Maintenance Facility |
| |||||
29(A) Construct new stockpile, including
1construction of all required buildings |
| |||||
2Project Allocation | 3,000,000 | |||||
3(Base Project Allocation - $1,750,000) |
| |||||
4(Land Allocation - $750,000) |
| |||||
5(Design & Contingencies - $500,000) |
| |||||
6(44) Northampton County |
| |||||
7(i) Northampton County Maintenance Facility |
| |||||
8(A) Construct new storage building, |
| |||||
11Project Allocation | 3,000,000 | |||||
12(Base Project Allocation - $1,750,000) |
| |||||
13(Land Allocation - $750,000) |
| |||||
14(Design & Contingencies - $500,000) |
| |||||
15(45) Northumberland County |
| |||||
16(i) Northumberland County Bridgebeam Facility |
| |||||
17(A) Renovate and expand current facility, |
| |||||
21Project Allocation | 3,000,000 | |||||
22(Base Project Allocation - $2,750,000) |
| |||||
23(Design & Contingencies - $250,000) |
| |||||
| ||||||
26(A) Construct new stockpile, including |
| |||||
29Project Allocation | 3,000,000 | |||||
30(Base Project Allocation - $1,750,000) |
| |||||
1(Land Allocation - $750,000) |
| |||||
2(Design & Contingencies - $500,000) |
| |||||
3(46) Perry County |
| |||||
4(i) Perry County Maintenance Facility |
| |||||
5(A) Construct new storage building, |
| |||||
8Project Allocation | 3,000,000 | |||||
9(Base Project Allocation - $1,750,000) |
| |||||
10(Land Allocation - $750,000) |
| |||||
11(Design & Contingencies - $500,000) |
| |||||
12(47) Philadelphia County |
| |||||
13(i) Philadelphia County Maintenance Facility |
| |||||
14(A) Construct new storage building, |
| |||||
17Project Allocation | 3,000,000 | |||||
18(Base Project Allocation - $1,750,000) |
| |||||
19(Land Allocation - $750,000) |
| |||||
20(Design & Contingencies - $500,000) |
| |||||
21(48) Pike County |
| |||||
22(i) Pike County Maintenance Facility |
| |||||
23(A) Construct new storage building, |
| |||||
26Project Allocation | 3,000,000 | |||||
27(Base Project Allocation - $1,750,000) |
| |||||
28(Land Allocation - $750,000) |
| |||||
29(Design & Contingencies - $500,000) |
| |||||
30(49) Potter County |
| |||||
1(i) Potter County Maintenance Facility |
| |||||
2(A) Construct new stockpile, including |
| |||||
5Project Allocation | 3,000,000 | |||||
6(Base Project Allocation - $1,750,000) |
| |||||
7(Land Allocation - $750,000) |
| |||||
8(Design & Contingencies - $500,000) |
| |||||
9(50) Schuylkill County |
| |||||
10(i) Schuylkill County Maintenance Facility |
| |||||
11(A) Construct new storage building, |
| |||||
14Project Allocation | 3,000,000 | |||||
15(Base Project Allocation - $1,750,000) |
| |||||
16(Land Allocation - $750,000) |
| |||||
17(Design & Contingencies - $500,000) |
| |||||
18(51) Snyder County |
| |||||
19(i) Snyder County Maintenance Garage |
| |||||
20(A) Renovate and expand storage building, |
| |||||
24Project Allocation | 2,500,000 | |||||
25(Base Project Allocation - $2,000,000) |
| |||||
26(Design & Contingencies - $500,000) |
| |||||
27(ii) Snyder County Maintenance Facility |
| |||||
28(A) Construct new stockpile, including |
| |||||
1Project Allocation | 3,000,000 | |||||
2(Base Project Allocation - $1,750,000) |
| |||||
3(Land Allocation - $750,000) |
| |||||
4(Design & Contingencies - $500,000) |
| |||||
5(52) Somerset County |
| |||||
6(i) Somerset County Maintenance Facility |
| |||||
7(A) Construct new storage facility, |
| |||||
10Project Allocation | 2,200,000 | |||||
11(Base Project Allocation - $1,600,000) |
| |||||
12(Land Allocation - $100,000) |
| |||||
13(Design & Contingencies - $500,000) |
| |||||
14(ii) Somerset County Maintenance Garage |
| |||||
15(A) Construct new stockpile, including |
| |||||
18Project Allocation | 15,000,000 | |||||
| ||||||
21(Land Allocation - $2,000,000) |
| |||||
22(Design & Contingencies - $500,000) |
| |||||
23(iii) Somerset County Stockpile Facility |
| |||||
| ||||||
26Project Allocation | 1,000,000 | |||||
27(Base Project Allocation - $900,000) |
| |||||
28(Land Allocation - $100,000) |
| |||||
29(53) Sullivan County |
| |||||
30(i) Sullivan County Maintenance Facility |
| |||||
1(A) Construct new stockpile, including |
| |||||
4Project Allocation | 3,000,000 | |||||
5(Base Project Allocation - $1,750,000) |
| |||||
6(Land Allocation - $750,000) |
| |||||
7(Design & Contingencies - $500,000) |
| |||||
8(54) Susquehanna County |
| |||||
9(i) Susquehanna County Maintenance Facility |
| |||||
10(A) Construct new storage building, |
| |||||
13Project Allocation | 3,100,000 | |||||
14(Base Project Allocation - $1,750,000) |
| |||||
15(Land Allocation - $750,000) |
| |||||
16(Design & Contingencies - $600,000) |
| |||||
17(B) Construct new storage building, |
| |||||
20Project Allocation | 1,500,000 | |||||
21(Base Project Allocation - $975,000) |
| |||||
22(Land Allocation - $300,000) |
| |||||
23(Design & Contingencies - $225,000) |
| |||||
24(55) Tioga County |
| |||||
25(i) Tioga County Maintenance Facility |
| |||||
26(A) Construct new stockpile, including |
| |||||
29Project Allocation | 3,000,000 | |||||
30(Base Project Allocation - $1,750,000) |
| |||||
1(Land Allocation - $750,000) |
| |||||
2(Design & Contingencies - $500,000) |
| |||||
3(56) Union County |
| |||||
4(i) Union County Maintenance Facility |
| |||||
5(A) Construct new stockpile, including |
| |||||
8Project Allocation | 3,000,000 | |||||
9(Base Project Allocation - $1,750,000) |
| |||||
10(Land Allocation - $750,000) |
| |||||
11(Design & Contingencies - $500,000) |
| |||||
12(57) Venango County |
| |||||
13(i) Venango County Maintenance Facility |
| |||||
14(A) Construct new storage building, |
| |||||
17Project Allocation | 3,000,000 | |||||
18(Base Project Allocation - $1,750,000) |
| |||||
19(Land Allocation - $750,000) |
| |||||
20(Design & Contingencies - $500,000) |
| |||||
21(58) Warren County |
| |||||
22(i) Warren County Bridgebeam Facility |
| |||||
23(A) Renovate and expand current facility, |
| |||||
27Project Allocation | 3,000,000 | |||||
28(Base Project Allocation - $2,750,000) |
| |||||
29(Design & Contingencies - $250,000) |
| |||||
30(ii) Warren County Maintenance Facility |
| |||||
1(A) Construct new storage building, |
| |||||
4Project Allocation | 3,000,000 | |||||
5(Base Project Allocation - $1,750,000) |
| |||||
6(Land Allocation - $750,000) |
| |||||
7(Design & Contingencies - $500,000) |
| |||||
8(iii) Warren County Maintenance Garage |
| |||||
9(A) Construct new stockpile, including |
| |||||
12Project Allocation | 15,000,000 | |||||
| ||||||
15(Land Allocation - $2,000,000) |
| |||||
16(Design & Contingencies - $500,000) |
| |||||
17(59) Washington County |
| |||||
18(i) Washington County Stockpile Facility |
| |||||
| ||||||
21Project Allocation | 1,000,000 | |||||
22(Base Project Allocation - $900,000) |
| |||||
23(Design & Contingencies - $100,000) |
| |||||
24(60) Wayne County |
| |||||
25(i) Wayne County Maintenance Facility |
| |||||
26(A) Construct new storage building, |
| |||||
29Project Allocation | 3,000,000 | |||||
30(Base Project Allocation - $1,750,000) |
| |||||
1(Land Allocation - $750,000) |
| |||||
2(Design & Contingencies - $500,000) |
| |||||
3(ii) Wayne County Maintenance Garage |
| |||||
4(A) Resurface garage floors and perform |
| |||||
6Project Allocation | 500,000 | |||||
7(Base Project Allocation - $450,000) |
| |||||
8(Design & Contingencies - $50,000) |
| |||||
9(61) Westmoreland County |
| |||||
10(i) Westmoreland County Maintenance Facility |
| |||||
11(A) Construct new salt storage building |
| |||||
12Project Allocation | 6,000,000 | |||||
13(Base Project Allocation - $5,500,000) |
| |||||
14(Design & Contingencies - $500,000) |
| |||||
15(B) Construct new storage building, |
| |||||
18Project Allocation | 3,000,000 | |||||
19(Base Project Allocation - $2,400,000) |
| |||||
20(Land Allocation - $100,000) |
| |||||
21(Design & Contingencies - $500,000) |
| |||||
22(ii) Westmoreland County Stockpile Facility |
| |||||
| ||||||
25Project Allocation | 1,000,000 | |||||
26(Base Project Allocation - $900,000) |
| |||||
27(Design & Contingencies - $100,000) |
| |||||
28(62) Wyoming County |
| |||||
29(i) Wyoming County Maintenance Facility |
| |||||
30(A) Construct new storage building, |
| |||||
3Project Allocation | 3,000,000 | |||||
4(Base Project Allocation - $1,750,000) |
| |||||
5(Land Allocation - $750,000) |
| |||||
6(Design & Contingencies - $500,000) |
| |||||
7(63) York County |
| |||||
8(i) York County Maintenance Facility |
| |||||
9(A) Construct new storage building, |
| |||||
12Project Allocation | 3,000,000 | |||||
13(Base Project Allocation - $1,750,000) |
| |||||
14(Land Allocation - $750,000) |
| |||||
15(Design & Contingencies - $500,000) |
| |||||
16(64) Various Counties |
| |||||
17(i) Bridgebeam Facilities |
| |||||
18(A) Design and construct three new |
| |||||
20Project Allocation | 9,000,000 | |||||
21(Base Project Allocation - $8,100,000) |
| |||||
22(Design & Contingencies - $900,000) |
|
23Section 11.1. Itemization of Pennsylvania Fish and Boat<-
24Commission capital projects.
25The individual capital projects in the category of public
26improvements projects to be acquired or developed by the
27Pennsylvania Fish and Boat Commission and to be financed by the
28incurring of debt or by the current revenues of the Fish Fund
29and the Boat Fund pursuant to executive authorizations are
30hereby itemized, together with their respective estimated costs,
1as follows:
3Project | Total Project |
4(1) Pennsylvania Fish and Boat Commission |
|
5(i) Berks County |
|
6(A) Design, permit, construct and |
|
8Project Allocation | 500,000 |
9(Base Project Allocation - $500,000) |
|
10(ii) Fulton County |
|
11(A) Design, permit and construct a |
|
14Project Allocation | 2,562,000 |
15(Base Project Allocation - $2,562,000) |
|
16(iii) Snyder County |
|
17(A) Design, permit and construct a |
|
20Project Allocation | 3,037,000 |
21(Base Project Allocation - $3,037,000) |
|
22(iv) Somerset County |
|
23(A) Design, permit and construct a |
|
26Project Allocation | 2,160,000 |
27(Base Project Allocation - $2,160,000) |
|
28(v) Wayne County |
|
29(A) Design, permit and construct a
1safety requirements |
|
2Project Allocation | 3,317,000 |
3(Base Project Allocation - $3,317,000) |
|
4(B) Design, permit and construct a |
|
7Project Allocation | 200,000 |
8(Base Project Allocation - $200,000) |
|
9(C) Design, permit and construct a |
|
12Project Allocation | 3,317,000 |
13(Base Project Allocation - $3,317,000) |
|
14Section 12. Debt authorization.
15(a) Public improvements.--The Governor, Auditor General and
16State Treasurer are hereby authorized and directed to borrow
17from time to time in addition to any authorization heretofore or
18hereafter enacted, on the credit of the Commonwealth, subject to
19the limitations provided in the current capital budget, money
20not exceeding in the aggregate the sum of $565,191,000<-
21$949,966,000.<-
22(b) Furniture and equipment.--The Governor, Auditor General
23and State Treasurer are hereby authorized and directed to borrow
24from time to time in addition to any authorization heretofore or
25hereafter enacted on the credit of the Commonwealth, subject to
26the limitations provided in the current capital budget, money
27not exceeding in the aggregate the sum of $1,600,000<- $19,600,000
28as may be found necessary to carry out the acquisition and
29construction of the public improvement projects consisting of
30the acquisition of original movable furniture and equipment
1specifically itemized in the capital budget.
2(c) Transportation assistance.--The Governor, Auditor
3General and State Treasurer are hereby authorized and directed
4to borrow from time to time in addition to any authorization
5heretofore or hereafter enacted, on the credit of the
6Commonwealth, subject to the limitations provided in the current
7capital budget, money not exceeding in the aggregate the sum of
8$451,893,000 $554,771,000 as may be found necessary to carry out<-
9the acquisition and construction of the transportation
10assistance projects specifically itemized in a capital budget.
11(d) Redevelopment assistance.--Subject to the limitation in
12section 317(b) of the act of February 9, 1999 (P.L.1, No.1),
13known as the Capital Facilities Debt Enabling Act, the Governor,
14Auditor General and State Treasurer are hereby authorized and
15directed to borrow from time to time in addition to any
16authorization heretofore or hereafter enacted, on the credit of
17the Commonwealth, subject to the limitations provided in the
18current capital budget, money not exceeding in the aggregate the
19sum of $787,027,000 $1,512,030,000 as may be found necessary to<-
20carry out the redevelopment assistance capital projects
21specifically itemized in a capital budget.
22(e) Flood control.--The Governor, Auditor General and State
23Treasurer are hereby authorized and directed to borrow from time
24to time in addition to an authorization heretofore or hereafter
25enacted, on the credit of the Commonwealth, subject to the
26limitations provided in the current capital budget, money not
27exceeding in the aggregate the sum of $48,205,000 $62,502,000 as<-
28may be found necessary to carry out the acquisition and
29construction of the flood control projects specifically itemized
30in a capital budget.
1(f) Pennsylvania Fish and Boat Commission projects.--The<-
2Governor, Auditor General and State Treasurer are hereby
3authorized and directed to borrow from time to time in addition
4to any authorization heretofore or hereafter enacted, on the
5credit of the Commonwealth, subject to the limitations provided
6in the current capital budget, money not exceeding in the
7aggregate the sum of $15,093,000 as may be found necessary to
8carry out the acquisition and construction of the Pennsylvania
9Fish and Boat Commission projects specifically itemized in a
10capital budget.
11Section 13. Issue of bonds.
12The indebtedness authorized in this act shall be incurred
13from time to time and shall be evidenced by one or more series
14of general obligation bonds of the Commonwealth in such
15aggregate principal amount for each series as the Governor, the
16Auditor General and the State Treasurer shall determine, but the
17latest stated maturity date shall not exceed estimated useful
18life of the projects being financed as stated in section 14.
19Section 14. Estimated useful life and term of debt.
20(a) Estimated useful life.--The General Assembly states that
21the estimated useful life of the public improvement projects
22itemized in this act is as follows:
23(1) Public improvement projects, 30 years.
24(2) Furniture and equipment, 10 years.
25(3) Transportation assistance projects:
26(i) Rolling stock, 15 years.
27(ii) Passenger buses, 12 years.
28(iii) Furniture and equipment, 10 years.
29(iv) All others, 30 years.
30(b) Term of debt.--The maximum term of the debt authorized
1to be incurred under this act is 30 years.
2Section 15. Appropriations.
3(a) Public improvements.--The net proceeds of the sale of
4the obligations authorized in this act are hereby appropriated
5from the Capital Facilities Fund to the Department of General
6Services in the maximum amount of $565,191,000 $949,966,000<- to
7be used by it exclusively to defray the financial cost of the
8public improvement projects specifically itemized in a capital
9budget. After reserving or paying the expenses of the sale of
10the obligation, the State Treasurer shall pay to the Department
11of General Services the moneys as required and certified by it
12to be legally due payable.
13(b) Furniture and equipment.--The net proceeds of the sale
14of the obligations authorized in this act are hereby
15appropriated from the Capital Facilities Fund to the Department
16of General Services in the maximum amount of $1,600,000<-
17$19,600,000<- to be used by it exclusively to defray the financial
18cost of the public improvement projects consisting of the
19acquisition of original movable furniture and equipment
20specifically itemized in a capital budget. After reserving or
21paying the expenses of the sale of the obligation, the State
22Treasurer shall pay to the Department of General Services the
23moneys as required and certified by it to be legally due and
24payable.
25(c) Transportation assistance.--The net proceeds of the sale
26of the obligations authorized in this act are hereby
27appropriated from the Capital Facilities Fund to the Department
28of Transportation in the maximum amount of $451,893,000<-
29$554,771,000<- to be used by it exclusively to defray the
30financial cost of the transportation assistance projects
1specifically itemized in a capital budget. After reserving or
2paying the expenses of the sale of the obligation, the State
3Treasurer shall pay to the Department of Transportation the
4moneys as required and certified by it to be legally due and
5payable.
6(d) Redevelopment assistance.--The net proceeds of the sale
7of the obligations authorized in this act are hereby
8appropriated from the Capital Facilities Fund to the Department
9of Community and Economic Development in the maximum amount of
10$787,027,000<- $1,512,030,000 to be used by it exclusively to
11defray the financial cost of the redevelopment assistance
12capital projects specifically itemized in a capital budget.
13After reserving or paying the expenses of the sale of the
14obligation, the State Treasurer shall pay to the Department of
15Community and Economic Development the moneys as required and
16certified by it to be legally due and payable.
17(e) Flood control.--The net proceeds of the sale of the
18obligations authorized in this act are hereby appropriated from
19the Capital Facilities Fund to the Department of Environmental
20Protection in the maximum amount of $48,205,000 $62,502,000 to<-
21be used by it exclusively to defray the financial cost of the
22flood control projects specifically itemized in a capital
23budget. After reserving or paying the expenses of the sale of
24the obligation, the State Treasurer shall pay to the Department
25of Environmental Protection the moneys as required and certified
26by it to be legally due and payable.
27Section 16. Federal funds.
28(a) Projects itemized in this act.--All moneys received from
29the Federal Government for the projects specifically itemized in
30this act are also hereby appropriated for those projects.
1(b) Projects not requiring itemization.--Department of
2Military and Veterans Affairs construction projects which are
3totally federally funded and to be administered by the
4Department of General Services are hereby authorized.
5Section 17. Editorial changes.
6In editing and preparing this act for printing following the
7final enactment, the Legislative Reference Bureau shall insert
8or revise letters or numbers for projects where the letters or
9numbers are missing or require revision. The Legislative
10Reference Bureau shall also revise the total monetary amounts
11for the total authorization, debt authorization, appropriations
12and department totals as necessary to agree with the total
13monetary amounts of the projects.
14Section 18. Effective date.
15This act shall take effect immediately.