PRINTER'S NO.  2061

  

THE GENERAL ASSEMBLY OF PENNSYLVANIA

  

HOUSE BILL

 

No.

1645

Session of

2011

  

  

INTRODUCED BY REESE, METZGAR, VULAKOVICH, AUMENT, CALTAGIRONE, CARROLL, D. COSTA, CUTLER, DUNBAR, EVANKOVICH, GABLER, GRELL, HALUSKA, HESS, HORNAMAN, KAVULICH, KRIEGER, MAHONEY, MARSHALL, MULLERY, MURT, MYERS, PAYTON, REICHLEY, STURLA, WAGNER, WATSON AND WHITE, JUNE 8, 2011

  

  

REFERRED TO COMMITTEE ON ENVIRONMENTAL RESOURCES AND ENERGY, JUNE 8, 2011  

  

  

  

AN ACT

  

1

Amending the act of December 19, 1984 (P.L.1140, No.223),

2

entitled "An act relating to the development of oil and gas

3

and coal; imposing duties and powers on the Department of

4

Environmental Resources; imposing notification requirements

5

to protect landowners; and providing for definitions, for

6

various requirements to regulate the drilling and operation

7

of oil and gas wells, for gas storage reservoirs, for various

8

reporting requirements, including certain requirements

9

concerning the operation of coal mines, for well permits, for

10

well registration, for distance requirements, for well casing

11

requirements, for safety device requirements, for storage

12

reservoir obligations, for well bonding requirements, for a

13

Well Plugging Restricted Revenue Account to enforce oil and

14

gas well plugging requirements, for the creation of an Oil

15

and Gas Technical Advisory Board, for oil and gas well

16

inspections, for enforcement and for penalties," in general

17

requirements, further providing for protection of fresh

18

groundwater and casing requirements and for protection of

19

water supplies.

20

The General Assembly of the Commonwealth of Pennsylvania

21

hereby enacts as follows:

22

Section 1.  Sections 207(a) and 208 of the act of December

23

19, 1984 (P.L.1140, No.223), known as the Oil and Gas Act, are

24

amended to read:

 


1

Section 207.  Protection of fresh groundwater; casing

2

requirements.

3

(a)  (1)  To aid in the protection of fresh groundwater,the

4

well operator shall control and dispose of brines produced

5

from the drilling, alteration or operation of an oil or gas

6

well in a manner consistent with the act of June 22, 1937

7

(P.L.1987, No.394), known as The Clean Streams Law, or any

8

rule or regulation promulgated thereunder. The well operator

9

shall store any wastewater resulting from hydraulic

10

fracturing operations in sealed, closed container systems

11

prior to the wastewater being reused or transfered from the

12

well site to an approved treatment and disposal facility.

13

(2)  For the purposes of this subsection, "sealed, closed

14

container systems" shall include pits or impoundments

15

containing a double-walled impermeable liner, perimeter

16

fencing and overhead netting; storage tanks or other

17

containment systems approved by the department.

18

* * *

19

Section 208.  Protection of water supplies.

20

(a)  Any well operator who affects a public or private water

21

supply by pollution or diminution shall restore or replace the

22

affected supply with an alternate source of water adequate in

23

quantity or quality for the purposes served by the supply.

24

(b)  Any landowner or water purveyor suffering pollution or

25

diminution of a water supply as a result of the drilling,

26

alteration or operation of an oil or gas well or pollution

27

resulting from any pit or impoundment used to store any

28

wastewater resulting from hydraulic fracturing operations may so

29

notify the department and request that an investigation be

30

conducted. Within ten days of such notification, the department

- 2 -

 


1

shall investigate any such claim and shall, within 45 days

2

following notification, make a determination. If the department

3

finds that the pollution or diminution was caused by the

4

drilling, alteration or operation activities, or from any pit or

5

impoundment used to store any wastewater resulting from

6

hydraulic fracturing operations, or if it presumes the well

7

operator responsible for pollution pursuant to subsection (c),

8

then it shall issue such orders to the well operator as are

9

necessary to assure compliance with subsection (a). Such orders

10

may include orders requiring the temporary replacement of a

11

water supply where it is determined that the pollution or

12

diminution may be of limited duration.

13

(c)  Unless rebutted by one of the five defenses established

14

in subsection (d), it shall be presumed that a well operator is

15

responsible for the pollution of a water supply that is within

16

1,000 feet of the oil or gas well or 1,000 feet of any pit or

17

impoundment used to store any wastewater resulting from

18

hydraulic fracturing operations, where the pollution occurred

19

within six months after the completion of drilling or alteration

20

of [such well] a well, or storage of wastewater resulting from

21

hydraulic fracturing operations in a pit or impoundment.

22

(d)  In order to rebut the presumption of liability

23

established in subsection (c), the well operator must

24

affirmatively prove one of the following five defenses:

25

(1)  The pollution existed prior to the drilling [or

26

alteration], alteration or hydraulic fracturing wastewater

27

storage activity as determined by a predrilling [or

28

prealteration survey], prealteration or survey conducted, in

29

accordance with subsection (e.1), prior to the storage of

30

hydraulic fracturing wastewater in a pit or impoundment.

- 3 -

 


1

(2)  The landowner or water purveyor refused to allow the

2

operator access to conduct a predrilling [or prealteration

3

survey], prealteration or survey conducted, in accordance

4

with subsection (e.1), prior to the storage of hydraulic

5

fracturing wastewater in a pit or impoundment.

6

(3)  The water supply is not within 1,000 feet of the

7

well or 1,000 feet of any pit or impoundment used to store

8

any wastewater resulting from hydraulic fracturing

9

operations.

10

(4)  The pollution occurred more than six months after

11

completion of drilling [or alteration], alteration or

12

hydraulic fracturing wastewater storage activities.

13

(5)  The pollution occurred as the result of some cause

14

other than the drilling [or alteration], alteration or

15

hydraulic fracturing wastewater storage activity.

16

(e)  Any operator electing to preserve its defenses under

17

subsection (d)(1) or (2) shall retain the services of an

18

independent certified laboratory to conduct the predrilling [or

19

prealteration], prealteration or survey of water supplies

20

conducted, in accordance with subsection (e.1), prior to the

21

storage of hydraulic fracturing wastewater in a pit or

22

impoundment. A copy of the results of any such survey shall be

23

submitted to the department and the landowner or water purveyor

24

in a manner prescribed by the department.

25

(e.1)  The department shall establish methods and criteria

26

for surveying water quality before and after the use of pits or

27

impoundments used to store any wastewater resulting from

28

hydraulic fracturing operations.

29

(f)  Nothing [herein shall] in this section shall be

30

construed to prevent any landowner or water purveyor who claims

- 4 -

 


1

pollution or diminution of a water supply from seeking any other

2

remedy that may be provided at law or in equity.

3

Section 2.  This act shall take effect in 60 days.

- 5 -