HOUSE AMENDED PRIOR PRINTER'S NOS. 2219, 2377, 2412 PRINTER'S NO. 2454
No. 1504 Session of 2008
INTRODUCED BY STOUT AND MADIGAN, JUNE 19, 2008
AS AMENDED ON SECOND CONSIDERATION, HOUSE OF REPRESENTATIVES, SEPTEMBER 24, 2008
AN ACT
1 Providing for the highway capital budget project itemization for
2 the fiscal year 2008-2009 TO BE FINANCED FROM CURRENT REVENUE <--
3 OR BY THE INCURRING OF DEBT.
4 The General Assembly of the Commonwealth of Pennsylvania
5 hereby enacts as follows:
6 CHAPTER 1
7 GENERAL PROVISIONS
8 Section 101. Short title.
9 This act shall be known and may be cited as the Highway
10 Capital Budget Project Itemization Act of 2008-2009.
11 Section 102. Total authorization.
12 The total authorization for the capital projects itemized in
13 Chapter 3 and to be constructed by the Department of
14 Transportation, its successors or assigns and to be financed BY <--
15 THE INCURRING OF DEBT OR from current revenues of the Motor
16 License Fund shall be $3,361,513,000 $4,655,654,000 <--
17 $4,716,904,000. <--
1 Section 103. Itemization of public highway projects. 2 Additional capital projects in the category of public highway 3 projects to be constructed by the Department of Transportation, 4 its successors or assigns and to be financed BY THE INCURRING OF <-- 5 DEBT OR from current revenues of the Motor License Fund are 6 itemized in Chapter 3, together with their respective estimated 7 financial costs. 8 CHAPTER 3 9 ITEMIZED PROJECTS 10 Total 11 Project 12 Project Allocation 13 Section 301. Adams County. 14 Projects are as follows: 15 (1) PA 94, Reconstruct, Add Lane, Widen 1,367,000 16 (Base Project Allocation - $,1,367,000) 17 Section 302. Allegheny County. 18 Projects are as follows: 19 (1) I-279, ITS Expansion, Corridor Safety 20 Improvement, I-279 from Camp Horne Road 21 to I-79, Franklin Park Borough and Ross 22 Township 763,000 23 (Base Project Allocation - $763,000) 24 (2) SR 1001, Concrete Pavement 25 Reconstruction, Rehabilitation, SR 26 1001, Freeport Road No.2 from Ross 27 Street to Burtner Road, Brackenridge 28 and Tarentum Boroughs and Harrison 29 Township 4,778,000 30 (Base Project Allocation - $4,328,000) 20080S1504B2454 - 2 -
1 (Design and Contingencies - $450,000) 2 (3) SR 1001, Concrete Pavement 3 Reconstruction, Rehabilitation, SR 4 1001, Freeport Road No.3 from Burtner 5 Road to Brackenridge Borough Line, 6 Brackenridge Borough and Harrison 7 Township 3,875,000 8 (Base Project Allocation - $3,520,000) 9 (Design and Contingencies - $355,000) 10 (4) SR 1001, Concrete Pavement 11 Reconstruction, Rehabilitation, SR 12 1001, Freeport Road No.1 from Baileys 13 Run to North of Larusse Boulevard, East 14 Deer and Tarentum Townships 1,162,000 15 (Base Project Allocation - $1,056,000) 16 (Design and Contingencies - $106,000) 17 (5) SR 1001, Concrete Pavement 18 Reconstruction, Rehabilitation, SR 19 1001, Etna Bypass, Etna Borough 696,000 20 (Base Project Allocation - $632,000) 21 (Design and Contingencies - $64,000) 22 (6) SR 1013, Concrete Pavement 23 Reconstruction, Rehabilitation, SR 24 1013, Saxonburg Boulevard, Indiana and 25 West Deer Townships 3,054,000 26 (Base Project Allocation - $2,774,000) 27 (Design and Contingencies - $280,000) 28 (7) SR 130, Safety Improvement, Allegheny 29 River Boulevard from Penn Hills to 30 Verona, Penn Hills Township and City of 20080S1504B2454 - 3 -
1 Pittsburgh 588,000 2 (Base Project Allocation - $553,000) 3 (Design and Contingencies - $35,000) 4 (8) SR 148, Concrete Pavement 5 Reconstruction, Rehabilitation, SR 148 6 from Eden Park Boulevard to Lincoln 7 Highway, City of McKeesport and North 8 Versailles Township 3,080,000 9 (Base Project Allocation - $2,800,000) 10 (Design and Contingencies - $280,000) 11 (9) SR 19, Concrete Pavement 12 Reconstruction, Rehabilitation, Perry 13 Highway, Westbound from Pine Creek Road 14 to South Church Road, McCandless and 15 Pine Townships 2,221,000 16 (Base Project Allocation - $2,016,000) 17 (Design and Contingencies - $205,000) 18 (10) SR 19, Concrete Pavement 19 Reconstruction, Rehabilitation, Perry 20 Highway, Eastbound from Pine Creek Road 21 to South Church Road, McCandless and 22 Pine Townships 2,221,000 23 (Base Project Allocation - $2,016,000) 24 (Design and Contingencies - $205,000) 25 (11) SR 19, Concrete Pavement 26 Reconstruction, Rehabilitation, 27 Washington Road, Eastbound from 28 Gilkeson Road to Cochran Road, Mt. 29 Lebanon Township 1,206,000 30 (Base Project Allocation - $1,096,000) 20080S1504B2454 - 4 -
1 (Design and Contingencies - $110,000) 2 (12) SR 19, Concrete Pavement 3 Reconstruction, Rehabilitation, 4 Washington Road, Westbound from 5 Gilkeson Road to Cochran Road, Mt. 6 Lebanon Township 898,000 7 (Base Project Allocation - $816,000) 8 (Design and Contingencies - $82,000) 9 (13) SR 19, Upgrade and Rebuild Ten 10 Signals, Safety Improvement, Perry 11 Highway from Ivory to Sewickley Oakmont 12 Road, West View Borough, Pine and Ross 13 Townships and City of Pittsburgh 50,000 14 (Design and Contingencies - $50,000) 15 (14) SR 19, Concrete Pavement 16 Reconstruction, Rehabilitation, SR 19, 17 Boyce Road, Upper St. Clair Township 1,098,000 18 (Base Project Allocation - $998,000) 19 (Design and Contingencies - $100,000) 20 (15) SR 19, Concrete Pavement 21 Reconstruction, Rehabilitation, 22 Perrysville Avenue from Bellevue Road 23 to Harden Drive, West View Borough 1,259,000 24 (Base Project Allocation - $1,144,000) 25 (Design and Contingencies - $115,000) 26 (16) SR 2048, Restoration, Rehabilitation, 27 Safety Improvements, Business Route 22 28 from Rodi Road, SR 791 to Mosside 29 Boulevard, SR 48, Churchill and 30 Monroeville Boroughs and Wilkins 20080S1504B2454 - 5 -
1 Township 1,998,000 2 (Base Project Allocation - $1,974,000) 3 (Design and Contingencies - $24,000) 4 (17) SR 2057, Concrete Pavement 5 Reconstruction, Rehabilitation, SR 6 2057, Haymaker Road, Monroeville 7 Borough 407,000 8 (Base Project Allocation - $370,000) 9 (Design and Contingencies - $37,000) 10 (18) SR 2058, Pavement Reconstruction, 11 Rehabilitation, SR 2058, Leechburg 12 Road, Penn Hills Township 966,000 13 (Base Project Allocation - $878,000) 14 (Design and Contingencies - $88,000) 15 (19) SR 2073, Concrete Pavement 16 Reconstruction, Rehabilitation, 17 Allegheny River Boulevard from Sandy 18 Creek to College, Verona and Oakmont 19 Boroughs and Penn Hills Township 805,000 20 (Base Project Allocation - $731,000) 21 (Design and Contingencies - $74,000) 22 (20) SR 2073, Concrete Pavement 23 Reconstruction, Rehabilitation, SR 2073 24 from South Avenue to Plum Street, 25 Verona Borough 330,000 26 (Base Project Allocation - $300,000) 27 (Design and Contingencies - $30,000) 28 (21) SR 2104, Concrete Pavement 29 Reconstruction, Rehabilitation, SR 30 2104, Churchill Road, Churchill 20080S1504B2454 - 6 -
1 Borough 410,000 2 (Base Project Allocation - $372,000) 3 (Design and Contingencies - $38,000) 4 (22) SR 2108, Concrete Pavement 5 Reconstruction, Rehabilitation, SR 6 2108, Wilkins Avenue, City of 7 Pittsburgh 363,000 8 (Base Project Allocation - $330,000) 9 (Design and Contingencies - $33,000) 10 (23) SR 2116, Concrete Pavement 11 Reconstruction, Rehabilitation, SR 12 2116, Bettis Road, Dravosburg and West 13 Mifflin Boroughs 429,000 14 (Base Project Allocation - $390,000) 15 (Design and Contingencies - $39,000) 16 (24) SR 2128, Concrete Pavement 17 Reconstruction, Rehabilitation, Tenth 18 Street Bypass Phase II, SR 8041 to Fort 19 Duquesne Boulevard, City of Pittsburgh 616,000 20 (Base Project Allocation - $560,000) 21 (Design and Contingencies - $56,000) 22 (25) SR 2128, Concrete Pavement 23 Reconstruction, Rehabilitation, SR 24 3004, McMurray Road, City of 25 Pittsburgh 623,000 26 (Base Project Allocation - $566,000) 27 (Design and Contingencies - $57,000) 28 (26) SR 2128, Concrete Pavement 29 Reconstruction, Rehabilitation, Tenth 30 Street Bypass Phase I, SR 8041 to Fort 20080S1504B2454 - 7 -
1 Duquesne Boulevard, City of Pittsburgh 616,000 2 (Base Project Allocation - $560,000) 3 (Design and Contingencies - $56,000) 4 (27) SR 279, Concrete Pavement 5 Reconstruction, Rehabilitation, SR 279, 6 Robinson Township to Fort Pitt Tunnel, 7 Carnegie, Green Tree and Rosslyn Farms 8 Boroughs, Collier, Scott and Robinson 9 Townships and City of Pittsburgh 2,860,000 10 (Base Project Allocation - $2,600,000) 11 (Design and Contingencies - $260,000) 12 (28) SR 28, Concrete Pavement 13 Reconstruction, Rehabilitation, SR 28, 14 Northbound from Baily's Run to County 15 Line, East Deer and Harrison Townships 13,750,000 16 (Base Project Allocation - $12,500,000) 17 (Design and Contingencies - $1,250,000) 18 (29) SR 28, Concrete Pavement 19 Reconstruction, Rehabilitation, SR 28 20 Southbound from Baily's Run to County 21 Line, East Deer and Harrison Townships 13,750,000 22 (Base Project Allocation - $12,500,000) 23 (Design and Contingencies - $1,250,000) 24 (30) SR 28, Concrete Pavement 25 Reconstruction, Rehabilitation, SR 28 26 from Milvale to Etna, Etna Borough and 27 Shaler Township 3,850,000 28 (Base Project Allocation - $3,500,000) 29 (Design and Contingencies - $350,000) 30 (31) SR 30, Concrete Pavement 20080S1504B2454 - 8 -
1 Reconstruction, Rehabilitation, SR 30 2 from County Line to Clinton Road, 3 Findlay Township 1,650,000 4 (Base Project Allocation - $1,500,000) 5 (Design and Contingencies - $150,000) 6 (32) SR 3005, Concrete Pavement 7 Reconstruction, Rehabilitation, SR 8 3005, Station Street to Bank Street, 9 Bridgeville Borough 421,000 10 (Base Project Allocation - $381,000) 11 (Design and Contingencies - $40,000) 12 (33) SR 3009, Concrete Pavement 13 Reconstruction, Rehabilitation, SR 14 3009, Baptist Road, Bethel Park and 15 Whitehall Boroughs 1,130,000 16 (Base Project Allocation - $1,027,000) 17 (Design and Contingencies - $103,000) 18 (34) SR 3009, Concrete Pavement 19 Reconstruction, Rehabilitation, SR 20 3009, South Park Road, Bethel Park 21 Borough 469,000 22 (Base Project Allocation - $426,000) 23 (Design and Contingencies - $43,000) 24 (35) SR 3028, Slide Correction, Concrete 25 Pavement Reconstruction, 26 Rehabilitation, SR 3028, at Presto and 27 Sygan Roads, South Fayette Township 1,100,000 28 (Base Project Allocation - $1,000,000) 29 (Design and Contingencies - $100,000) 30 (36) SR 3038, Safety Improvement, Conner 20080S1504B2454 - 9 -
1 Road from Washington Road to Library 2 Road, Bethel Park Borough and Mt. 3 Lebanon Township 354,000 4 (Base Project Allocation - $304,000) 5 (Design and Contingencies - $50,000) 6 (37) SR 3044, Concrete Pavement 7 Reconstruction, Rehabilitation, Castle 8 Shannon Boulevard from Washington Road 9 to Scott Road, Mt. Lebanon Township 1,100,000 10 (Base Project Allocation - $1,000,000) 11 (Design and Contingencies - $100,000) 12 (38) SR 3054, Slide Correction, Concrete 13 Pavement Reconstruction, 14 Rehabilitation, SR 3054, Segment 0020 15 and Segment 0030, Collier Township 1,100,000 16 (Base Project Allocation - $1,000,000) 17 (Design and Contingencies - $100,000) 18 (39) SR 3065, New Two-Lane Roadway, 19 Banksville Connection to Wabash Tunnel 20 to Banksville Road in City of 21 Pittsburgh, Green Tree Borough 14,620,000 22 (Base Project Allocation - $10,000,000) 23 (Land Allocation - $2,000,000) 24 (Design and Contingencies - $2,620,000) 25 (40) SR 3069, Concrete Pavement 26 Reconstruction, Rehabilitation, SR 3069 27 from Liberty Bridge to 6th Avenue, City 28 of Pittsburgh 1,650,000 29 (Base Project Allocation - $1,500,000) 30 (Design and Contingencies - $150,000) 20080S1504B2454 - 10 -
1 (41) SR 3069, Concrete Pavement 2 Reconstruction, Rehabilitation, West 3 Liberty Avenue from McFarland to Saw 4 Mill Run, Dormont Borough and City of 5 Pittsburgh 2,139,000 6 (Base Project Allocation - $1,944,000) 7 (Design and Contingencies - $195,000) 8 (42) SR 3085, Concrete Pavement 9 Reconstruction, Rehabilitation, SR 10 3085, Forest Grove Road, Robinson 11 Township 590,000 12 (Base Project Allocation - $536,000) 13 (Design and Contingencies - $54,000) 14 (43) SR 3087, Concrete Pavement 15 Reconstruction, Rehabilitation, SR 16 3087, Thorn Run Road, Moon Township 752,000 17 (Base Project Allocation - $683,000) 18 (Design and Contingencies - $69,000) 19 (44) SR 3092, Concrete Pavement 20 Reconstruction, Rehabilitation, SR 21 3092, Broadway Street, Stowe Township 398,000 22 (Base Project Allocation - $361,000) 23 (Design and Contingencies - $37,000) 24 (45) SR 366, Signal Improvements at 4 25 Intersections, SR 8 and SR 366, 2 26 Intersections Each, Tarentum Borough 27 and Shaler Township 50,000 28 (Base Project Allocation - $50,000) 29 (46) SR 376, Installation of ITS Equipment 30 to Include Variable Traffic System, I- 20080S1504B2454 - 11 -
1 376 from South Braddock Avenue to SR 2 2048, Business Route 22, Braddock 3 Hills, Churchill, Edgewood, Wilkinsburg 4 Boroughs and City of Pittsburgh 35,000 5 (Base Project Allocation - $35,000) 6 (47) SR 376, Pavement Reconstruction, 7 Rehabilitation, Squirrel Hill Tunnel 8 Rehabilitation No.2, City of 9 Pittsburgh 4,950,000 10 (Base Project Allocation - $4,500,000) 11 (Design and Contingencies - $450,000) 12 (48) SR 400, Concrete Pavement 13 Reconstruction, Rehabilitation, Bigelow 14 Boulevard, Northbound Craig to 15 Bloomfield Bridge, City of Pittsburgh 550,000 16 (Base Project Allocation - $500,000) 17 (Design and Contingencies - $50,000) 18 (49) SR 400, Concrete Pavement 19 Reconstruction, Rehabilitation, Bigelow 20 Boulevard, Southbound Craig to 21 Bloomfield Bridge, City of Pittsburgh 550,000 22 (Base Project Allocation - $500,000) 23 (Design and Contingencies - $50,000) 24 (50) SR 4003, Concrete Pavement 25 Reconstruction, Rehabilitation, SR 26 4003, McKnight Road Phase II, Ross and 27 McCandless Townships 6,592,000 28 (Base Project Allocation - $5,992,000) 29 (Design and Contingencies - $600,000) 30 (51) SR 4003, Concrete Pavement 20080S1504B2454 - 12 -
1 Reconstruction, Rehabilitation, SR 2 4003, McKnight Road Phase I, Ross and 3 McCandless Townships 6,458,000 4 (Base Project Allocation - $5,858,000) 5 (Design and Contingencies - $600,000) 6 (52) SR 4024, Concrete Pavement 7 Reconstruction, Rehabilitation, SR 8 4024, Duncan Avenue, McCandless 9 Township 836,000 10 (Base Project Allocation - $760,000) 11 (Design and Contingencies - $76,000) 12 (53) SR 4036, Concrete Pavement 13 Reconstruction, Rehabilitation, Big 14 Sewickley Creek Road from Sunset Drive 15 to Hitzell Hill Road, Bell Acres and 16 Economy Boroughs 1,870,000 17 (Base Project Allocation - $1,700,000) 18 (Design and Contingencies - $170,000) 19 (54) SR 4052, Intersection Improvement, 20 Widen, Warrendale-Bayne Road, 21 Improvements, Phase II, Marshall 22 Township 99,000 23 (Base Project Allocation - $99,000) 24 (55) SR 4084, Concrete Pavement 25 Reconstruction, Rehabilitation, SR 26 4084, Western Avenue and Ridge from 27 Chateau Street to Brighton Road, City 28 of Pittsburgh 784,000 29 (Base Project Allocation - $712,000) 30 (Design and Contingencies - $72,000) 20080S1504B2454 - 13 -
1 (56) SR 48, Concrete Pavement 2 Reconstruction, Rehabilitation, SR 48, 3 Scenery Drive, Forward and Elizabeth 4 Townships 715,000 5 (Base Project Allocation - $650,000) 6 (Design and Contingencies - $65,000) 7 (57) SR 48, Concrete Pavement 8 Reconstruction, Rehabilitation, SR 48, 9 T-130 to Macbeth Drive, Monroeville 10 Borough 2,120,000 11 (Base Project Allocation - $1,920,000) 12 (Design and Contingencies - $200,000) 13 (58) SR 50, Upgrade and Coordinate 8 14 Signals, Safety Improvement, PA 50, 15 Collier Street to Noblestown and 16 Poplar, Carnegie, Green Tree and 17 Heidelberg Boroughs, Scott Township and 18 City of Pittsburgh 18,000 19 (Design and Contingencies - $18,000) 20 (59) SR 51, Traffic Signal Upgrade, 9 21 Intersections, Existing Signal 22 Improvement, Saw Mill Run Boulevard 23 from Edgebrooke Avenue to Stewart 24 Avenue, Brentwood and Whitehall 25 Boroughs and City of Pittsburgh 232,000 26 (Base Project Allocation - $232,000) 27 (60) SR 51, Concrete Pavement 28 Reconstruction, Rehabilitation, 29 Clairton Boulevard from Lewis Run to 30 Cloverleaf, Pleasant Hills Borough 7,260,000 20080S1504B2454 - 14 -
1 (Base Project Allocation - $6,600,000) 2 (Design and Contingencies - $660,000) 3 (61) SR 60, Concrete Pavement 4 Reconstruction, Rehabilitation, SR 60 5 from Business Route 60 to South 6 Expressway, Findlay and Moon Townships 10,474,000 7 (Base Project Allocation - $9,522,000) 8 (Design and Contingencies - $952,000) 9 (62) SR 60, New Interchange, Dick's 10 Sporting Goods Headquarters, Between SR 11 60 and Business Route 60, Clinton Road 12 and Flaugherty Run Interchange, Findlay 13 Township 1,868,000 14 (Base Project Allocation - $1,868,000) 15 (63) SR 60, Concrete Pavement 16 Reconstruction, Rehabilitation, SR 60, 17 South Expressway No.2, Segment 0353 to 18 Segment 0392 from Airport to Flaugherty 19 Run, Findlay and Moon Townships 18,500,000 20 (Base Project Allocation - $18,500,000) 21 (64) SR 60, Concrete Pavement 22 Reconstruction, Rehabilitation, SR 60, 23 South Expressway No.1, Segment 0352 to 24 Segment 0392 from Airport to Flaugherty 25 Run, Findlay and Moon Townships 18,500,000 26 (Base Project Allocation - $18,500,000) 27 (65) SR 60, Concrete Pavement 28 Reconstruction, Rehabilitation, SR 60, 29 South Expressway No.4, Segment 0293 to 30 Segment 0353 from Business Route 60 to 20080S1504B2454 - 15 -
1 Airport, Moon Township 20,000,000 2 (Base Project Allocation - $20,000,000) 3 (66) SR 60, Concrete Pavement 4 Reconstruction, Rehabilitation, SR 60, 5 South Expressway No.3, Segment 0292 to 6 Segment 0352 from Business Route 60 to 7 Airport, Moon Township 20,000,000 8 (Base Project Allocation - $20,000,000) 9 (67) SR 60, Concrete Pavement 10 Reconstruction, Rehabilitation, 11 Steubenville Pike from Parkway West to 12 I-79, Robinson Township 2,750,000 13 (Base Project Allocation - $2,500,000) 14 (Design and Contingencies - $250,000) 15 (68) SR 60, Concrete Pavement 16 Reconstruction, Rehabilitation, SR 60 17 from SR 22 to Business Route 60, Moon, 18 North Fayette and Robinson Townships 1,162,000 19 (Base Project Allocation - $1,056,000) 20 (Design and Contingencies - $106,000) 21 (69) SR 65, Upgrade and Coordinate 17 22 Signals, Safety Improvement, SR 65 from 23 West End Bridge to Cross Street, 24 Various Municipalities 200,000 25 (Base Project Allocation - $160,000) 26 (Design and Contingencies - $40,000) 27 (70) SR 79, Concrete Patching Restoration, 28 Interstate Maintenance, SR 79 from 29 Washington County Line to Bridgeville, 30 Segment 496 to Segment 525, Bridgeville 20080S1504B2454 - 16 -
1 Borough and South Fayette Township 1,055,000 2 (Base Project Allocation - $927,000) 3 (Design and Contingencies - $128,000) 4 (71) SR 79, Concrete Pavement 5 Reconstruction, Rehabilitation, SR 79 6 from SR 279 to SR 910, including SR 910 7 Overhead Deck Replacement, Franklin 8 Park Borough and Marshall Township 2,228,000 9 (Base Project Allocation - $2,025,000) 10 (Design and Contingencies - $203,000) 11 (72) SR 79, Concrete Patching Restoration, 12 Interstate Maintenance, SR 79 from 13 Campbells Run to Moon Run, Segment 586 14 to Segment 605, Kennedy and Robinson 15 Townships 885,000 16 (Base Project Allocation - $800,000) 17 (Design and Contingencies - $85,000) 18 (73) SR 79, Concrete Patching Restoration, 19 Interstate Maintenance, SR 79 from 20 Campbells Run to Moon Run, Various 21 Municipalities 97,000 22 (Base Project Allocation - $97,000) 23 (74) SR 791, Concrete Pavement 24 Reconstruction, Rehabilitation, SR 791, 25 Rodi Road Phase I, US 22 to Maple Lane, 26 Churchill Borough 385,000 27 (Base Project Allocation - $350,000) 28 (Design and Contingencies - $35,000) 29 (75) SR 791, Concrete Pavement 30 Reconstruction, Rehabilitation, SR 791, 20080S1504B2454 - 17 -
1 Rodi Road Phase II, Segment 0021/0000 2 to Segment 0021/1656, Churchill 3 Borough 330,000 4 (Base Project Allocation - $300,000) 5 (Design and Contingencies - $30,000) 6 (76) SR 8, Concrete Pavement 7 Reconstruction, Rehabilitation, 8 Allegheny River Boulevard, Southbound 9 from Washington Boulevard to Highland 10 Park Bridge, City of Pittsburgh 330,000 11 (Base Project Allocation - $300,000) 12 (Design and Contingencies - $30,000) 13 (77) SR 8, Concrete Pavement 14 Reconstruction, Rehabilitation, 15 Allegheny River Boulevard, Northbound 16 from Washington Boulevard to Highland 17 Park Bridge, City of Pittsburgh 330,000 18 (Base Project Allocation - $300,000) 19 (Design and Contingencies - $30,000) 20 (78) SR 8, Corridor Safety Improvements, 21 Congestion Reduction, Penn Avenue and 22 Ardmore Boulevard from I-376 to 23 Braddock Avenue, Hampton, Richland and 24 Shaler Townships 175,000 25 (Base Project Allocation - $125,000) 26 (Design and Contingencies - $50,000) 27 (79) SR 8, Concrete Pavement 28 Reconstruction, Rehabilitation, Penn 29 Avenue from South Avenue to Braddock 30 Avenue, Wilkinsburg Borough 447,000 20080S1504B2454 - 18 -
1 (Base Project Allocation - $406,000) 2 (Design and Contingencies - $41,000) 3 (80) SR 837, Slide Correction, Concrete 4 Rehabilitation, SR 837, Segment 190, 5 Dravosburg and West Mifflin Boroughs 2,200,000 6 (Base Project Allocation - $2,000,000) 7 (Design and Contingencies - $200,000) 8 (81) SR 88, Concrete Pavement 9 Reconstruction, Rehabilitation, Library 10 Road from Castle Shannon Boulevard to 11 South Park Road, Bethel Park and Castle 12 Shannon Boroughs 2,500,000 13 (Base Project Allocation - $2,272,000) 14 (Design and Contingencies - $228,000) 15 (82) SR 88, Concrete Pavement 16 Reconstruction, Rehabilitation, Library 17 Road from Brownsville and County Line 18 to South Park Road, Bethel Park Borough 19 and South Park Township 3,215,000 20 (Base Project Allocation - $2,920,000) 21 (Design and Contingencies - $295,000) 22 (83) SR 885, Concrete Pavement 23 Reconstruction, Rehabilitation, SR 885 24 from State Street to Beechway, City of 25 Clairton 330,000 26 (Base Project Allocation - $300,000) 27 (Design and Contingencies - $30,000) 28 (84) SR 885, Concrete Pavement 29 Reconstruction, Rehabilitation, SR 885 30 from Clairton Road to Payne Hill Road, 20080S1504B2454 - 19 -
1 Jefferson Hills Borough 517,000 2 (Base Project Allocation - $470,000) 3 (Design and Contingencies - $47,000) 4 (85) SR 910, Construct Left Turn Lanes and 5 Adjust Traffic Signals, Intersection 6 Improvement, Wexford Run Road, Left 7 Turn, Intersection of SR 910 Wexford- 8 Bayne Road and SR 4053 Wexford Run 9 Road, Marshall Township 70,000 10 (Base Project Allocation - $64,000) 11 (Design and Contingencies - $6,000) 12 (86) SR 910, Concrete Pavement 13 Reconstruction, Rehabilitation, SR 910, 14 Wexford-Bayne Road from South Church 15 Road to Babcock Boulevard, Pine 16 Township 2,669,000 17 (Base Project Allocation - $2,424,000) 18 (Design and Contingencies - $245,000) 19 (87) SR 910, Pavement Reconstruction, 20 Rehabilitation, SR 910, Wexford-Bayne 21 Road from Mingo Road to North Church 22 Road, Pine Township 1,736,000 23 (Base Project Allocation - $1,576,000) 24 (Design and Contingencies - $160,000) 25 (88) SR 978, Pavement Reconstruction, 26 Rehabilitation, Union Avenue from 27 Battle Ridge Road to Noblestown Road, 28 Oakdale Borough and South Fayette 29 Township 339,000 30 (Base Project Allocation - $308,000) 20080S1504B2454 - 20 -
1 (Design and Contingencies - $31,000) 2 (89) Various Routes, Installation of 3 Center Line Rumble Strips, Rumble 4 Strips 2008, Various Municipalities 200,000 5 (Base Project Allocation - $200,000) 6 (90) I-279, Interstate Restoration and 7 Reconstruction 19,000,000 8 (Base Project Allocation - $19,000,000) 9 (91) I-376, Interstate Restoration and 10 Reconstruction 14,000,000 11 (Base Project Allocation - $14,000,000) 12 (92) I-576, Interstate Restoration and 13 Reconstruction 1,200,000 14 (Base Project Allocation - $1,200,000) 15 (93) I-79, Interstate Restoration and 16 Reconstruction 27,000,000 17 (Base Project Allocation - $27,000,000) 18 (94) SR 3009, Safety and Intersection 19 Improvements - Signals Updates, 20 Widening, Turning Lanes 775,000 21 (Base Project Allocation - $775,000) 22 (95) SR 28, Prep Work, Safety Improvement, 23 Divided Relocation, Median Barrier, 24 Planning, Widen, Alternative Route 25 Improvements and ITS Systems 832,000 26 (Base Project Allocation - $832,000) 27 (96) SR 4003, Corridor Safety Improvement 28 Upgrade and Coordinate Traffic Signals 29 at Four Locations 3,000 30 (Design and Contingencies - $3,000) 20080S1504B2454 - 21 -
1 (97) SR 60, Reconstruction, Redesign 2 Interchange Realignment, Safety 3 Improvement and Signing 2,000,000 4 (Base Project Allocation - $2,000,000) 5 (98) SR 8, Widen the Existing Pavement to 6 Provide Turning Lanes 156,000 7 (Base Project Allocation - $156,000) 8 (99) SR 48, Extension of Marsh Drive to 9 Intersect SR 48 910,000 10 (Base Project Allocation - $800,000) 11 (Land Allocation - $100,000) 12 (Design and Contingencies - $10,000) 13 (100) SR 8, IMPROVEMENTS AT INTERSECTION <-- 14 WITH DUNCAN AVENUE, INCLUDING WIDENING, 15 CONSTRUCTION OF TURNING LANES, 16 REALIGNMENT, ROADWAY DRAINAGE AND 17 RIGHT-OF-WAY ACQUISITION 5,501,000 18 (BASE PROJECT ALLOCATION - $4,394,000) 19 (LAND ALLOCATION - $1,107,000) 20 Section 303. Armstrong County. 21 Projects are as follows: 22 (1) SR 28, New Park and Ride Lot 113,000 23 (Base Project Allocation - $102,000) 24 (Land Allocation - $11,000) 25 (2) SR 28, Pavement Reconstruction and 26 Rehabilitation 1,380,000 27 (Base Project Allocation - $1,380,000) 28 (3) SR 422, Pavement Reconstruction and 29 Rehabilitation 520,000 30 (Base Project Allocation - $520,000) 20080S1504B2454 - 22 -
1 (4) SR 422, Pavement Reconstruction and 2 Rehabilitation 140,000 3 (Base Project Allocation - $140,000) 4 (5) SR 422, Restoration and Safety 5 Improvements 17,600,000 6 (Base Project Allocation - $14,400,000) 7 (Land Allocation - $1,600,000) 8 (Design and Contingencies - $1,600,000) 9 (6) SR 422, MARGARET ROAD INTERSECTION, <-- 10 REALIGN 2,500 FEET OF SR 422 NORTH OF 11 EXISTING INTERSECTION 19,500,000 12 (BASE PROJECT ALLOCATION - $17,000,000) 13 (LAND ALLOCATION - $500,000) 14 (DESIGN AND CONTINGENCIES - $2,000,000) 15 (7) SR 422, WRAY PLAN TO THEATER ROAD, 16 REALIGNMENT OF APPROXIMATELY 9,100 FEET 17 OF ROADWAY, FLATTEN VERTICAL PROFILE 18 AND SITE DISTANCE IMPROVEMENTS 9,500,000 19 (BASE PROJECT ALLOCATION - $7,500,000) 20 (LAND ALLOCATION - $1,000,000) 21 (DESIGN AND CONTINGENCIES - $1,000,000) 22 (8) SR 422, ROSEBUD TRUCKING TO CHRYSLER 23 DEALER, FLATTEN VERTICAL PROFILE AND 24 SITE DISTANCE IMPROVEMENT 5,000,000 25 (BASE PROJECT ALLOCATION - $3,500,000) 26 (LAND ALLOCATION - $500,000) 27 (DESIGN AND CONTINGENCIES - $1,000,000) 28 (9) SR 422, KITTANNING TOWNSHIP FIRE 29 DEPARTMENT, FLATTEN VERTICAL PROFILE TO 30 INCREASE SITE DISTANCE 2,000,000 20080S1504B2454 - 23 -
1 (BASE PROJECT ALLOCATION - $1,000,000) 2 (LAND ALLOCATION - $500,000) 3 (DESIGN AND CONTINGENCIES - $500,000) 4 (10) SR 422, SR 210 TO DUTCH ROAD, 5 UPGRADES TO INTERSECTION AT DUTCH ROAD, 6 INSTALLATION OF A WESTBOUND AUXILIARY 7 LANE 6,000,000 8 (BASE PROJECT ALLOCATION - $4,500,000) 9 (LAND ALLOCATION - $500,000) 10 (DESIGN AND CONTINGENCIES - $1,000,000) 11 (11) SR 422, SPEED ENFORCEMENT LOCATION: 1 12 EASTBOUND 550,000 13 (BASE PROJECT ALLOCATION - $250,000) 14 (LAND ALLOCATION - $50,000) 15 (DESIGN AND CONTINGENCIES - $250,000) 16 (12) SR 422, SPEED ENFORCEMENT LOCATION: 1 17 WESTBOUND 550,000 18 (BASE PROJECT ALLOCATION - $250,000) 19 (LAND ALLOCATION - $50,000) 20 (DESIGN AND CONTINGENCIES - $250,000) 21 (13) SR 422, RUPP CHURCH ROAD 22 INTERSECTION, CUT CREST CURVE TO 23 IMPROVE SITE DISTANCE 4,500,000 24 (BASE PROJECT ALLOCATION - $3,000,000) 25 (LAND ALLOCATION - $500,000) 26 (DESIGN AND CONTINGENCIES - $1,000,000) 27 (14) SR 422, SILVIS HOLLOW ROAD 28 INTERSECTION, REALIGN HORIZONTAL AND 29 VERTICAL CURVES AND CUT BACK SIDE 30 SLOPES TO IMPROVE SITE DISTANCE 4,500,000 20080S1504B2454 - 24 -
1 (BASE PROJECT ALLOCATION - $3,000,000) 2 (LAND ALLOCATION - $500,000) 3 (DESIGN AND CONTINGENCIES - $1,000,000) 4 (15) SR 422, BLANKET HILL ROAD 5 INTERSECTION, REALIGN HORIZONTAL AND 6 VERTICAL CURVES AND CUT BACK SIDE 7 SLOPES TO IMPROVE SITE DISTANCE 4,500,000 8 (BASE PROJECT ALLOCATION - $3,000,000) 9 (LAND ALLOCATION - $500,000) 10 (DESIGN AND CONTINGENCIES - $1,000,000) 11 (16) SR 422, SIMPSON CHURCH ROAD 12 INTERSECTION, REALIGN HORIZONTAL AND 13 VERTICAL CURVES AND CUT BACK SIDE 14 SLOPES TO IMPROVE SITE DISTANCE 4,500,000 15 (BASE PROJECT ALLOCATION - $3,000,000) 16 (LAND ALLOCATION - $500,000) 17 (DESIGN AND CONTINGENCIES - $1,000,000) 18 (17) SR 422, SANDY FLAT ROAD INTERSECTION, 19 CUT BACK SIDE SLOPES TO IMPROVE SITE 20 DISTANCE 4,000,000 21 (BASE PROJECT ALLOCATION - $3,500,000) 22 (LAND ALLOCATION - $250,000) 23 (DESIGN AND CONTINGENCIES - $250,000) 24 (18) SR 422, BLOSE HOLLOW ROAD 25 INTERSECTION, CUT BACK SIDE SLOPES TO 26 IMPROVE SITE DISTANCE 3,000,000 27 (BASE PROJECT ALLOCATION - $2,500,000) 28 (LAND ALLOCATION - $250,000) 29 (DESIGN AND CONTINGENCIES - $250,000) 30 (19) SR 422, FARSTER ROAD INTERSECTION, 20080S1504B2454 - 25 -
1 REALIGNMENT AND CUT BACK SLOPE TO 2 IMPROVE SITE DISTANCE 4,300,000 3 (BASE PROJECT ALLOCATION - $3,000,000) 4 (LAND ALLOCATION - $500,000) 5 (DESIGN AND CONTINGENCIES - $800,000) 6 (20) SR 422, GIBSON SCHOOL ROAD 7 INTERSECTION, MINOR SLOPE CUT BACK TO 8 IMPROVE SITE DISTANCE 2,500,000 9 (BASE PROJECT ALLOCATION - $2,000,000) 10 (LAND ALLOCATION - $250,000) 11 (DESIGN AND CONTINGENCIES - $250,000) 12 (21) SR 422, COAL BANK ROAD INTERSECTION, 13 CUT BACK SIDE SLOPES TO IMPROVE SITE 14 DISTANCE 2,500,000 15 (BASE PROJECT ALLOCATION - $2,000,000) 16 (LAND ALLOCATION - $250,000) 17 (DESIGN AND CONTINGENCIES - $250,000) 18 Section 304. Beaver County. 19 Projects are as follows: 20 (1) SR 1003, Concrete Pavement 21 Reconstruction, Rehabilitation, SR 22 1003, Hillside Avenue to T-65, Elwood 23 City Borough 330,000 24 (Base Project Allocation - $300,000) 25 (Design and Contingencies - $30,000) 26 (2) SR 1003, Concrete Rehabilitation, 27 Reconstruct and Bituminous Overlay, 28 Brighton Road from Cherry Hill Road to 29 Hillside Avenue, Elwood City Borough 30 and North Sewickley Township 234,000 20080S1504B2454 - 26 -
1 (Base Project Allocation - $234,000) 2 (3) SR 1003, Concrete Pavement 3 Reconstruction, Rehabilitation, 4 Brighton Road from Route 65 to SR 1002 5 and Cherry Hill Road, North Sewickley 6 Township 701,000 7 (Base Project Allocation - $637,000) 8 (Design and Contingencies - $64,000) 9 (4) SR 1021, Concrete Rehabilitation, 10 Reconstruct, Pine Run Road from SR 1015 11 to Route 588, Marion Township 560,000 12 (Base Project Allocation - $560,000) 13 (5) SR 1024, Concrete Rehabilitation, 14 Reconstruct and Bituminous Overlay, 15 Deer Lane Extension from Virginia 16 Avenue to Big Knob Road, New Sewickley 17 and Rochester Townships 943,000 18 (Base Project Allocation - $943,000) 19 (6) SR 1039, Concrete Rehabilitation, 20 Reconstruct and Bituminous Overlay, 21 Virginia Avenue and Rochester Road from 22 SR 68 to Sunflower Road, Pulaski and 23 Rochester Townships 364,000 24 (Base Project Allocation - $364,000) 25 (7) SR 151, Concrete Rehabilitation, 26 Reconstruct and Bituminous Overlay, 27 Bocktown Road from Route 30 to Thompson 28 Hill Road, Greene, Hanover, 29 Independence and Raccoon Townships 2,260,000 30 (Base Project Allocation - $2,210,000) 20080S1504B2454 - 27 -
1 (Design and Contingencies - $50,000) 2 (8) SR 151, Concrete Rehabilitation, 3 Reconstruct and Bituminous Overlay, 4 Bocktown Road from Thompson Hill Road 5 to Route 60 Interchange, Hopewell and 6 Independence Townships 1,089,000 7 (Base Project Allocation - $1,089,000) 8 (9) SR 168, Concrete Pavement 9 Reconstruction, Rehabilitation, 10 Hookstown and Frankfurt Road from 11 Temple Road to Route 30, Greene 12 Township 571,000 13 (Base Project Allocation - $519,000) 14 (Design and Contingencies - $52,000) 15 (10) SR 18, Concrete Rehabilitation, 16 Reconstruct and Bituminous Overlay, 17 Main Street from Washington County Line 18 to Traverse Creek, Frankfort Springs 19 Borough and Hanover Township 699,000 20 (Base Project Allocation - $699,000) 21 (11) SR 18, Concrete Rehabilitation, 22 Reconstruct and Bituminous Overlay, 23 Frankfort Road from Century Farm Road 24 to Hanover Kendall Road, Hanover 25 Township 192,000 26 (Base Project Allocation - $192,000) 27 (12) SR 18, Concrete Rehabilitation, 28 Reconstruct and Bituminous Overlay, 29 Frankfort Road from Newer Pavement to 30 Service Creek Road, Hanover and Raccoon 20080S1504B2454 - 28 -
1 Townships 628,000 2 (Base Project Allocation - $628,000) 3 (13) SR 2001, Concrete Rehabilitation, 4 Reconstruct, Eastbound Duss Avenue from 5 Twenty-fourth Street to Legionville 6 Road, Harmony Township 816,000 7 (Base Project Allocation - $816,000) 8 (14) SR 2001, Concrete Rehabilitation, 9 Reconstruct, Westbound Duss Avenue from 10 Twenty-fourth Street to Legionville 11 Road, Harmony Township 816,000 12 (Base Project Allocation - $816,000) 13 (15) SR 2004, Concrete Pavement 14 Reconstruction, Rehabilitation, Ninth 15 Street from Third Avenue to Freedom- 16 Crider Road, Freedom Borough and North 17 Sewickley Township 386,000 18 (Base Project Allocation - $351,000) 19 (Design and Contingencies - $35,000) 20 (16) SR 2004, Realignment and Roadway 21 Reconstruction, Safety Improvement, 22 Freedom Road from SR 65 to Park Quarry 23 Road Upgrade, Phase A, New Sewickley 24 Township 4,400,000 25 (Base Project Allocation - $4,400,000) 26 (17) SR 2004, Slides Correction Concrete 27 Rehabilitation, Reconstruction, Lovi 28 Road, SR 2004, Segment 0040 to Segment 29 0050, New Sewickley Township 930,000 30 (Base Project Allocation - $850,000) 20080S1504B2454 - 29 -
1 (Land Allocation - $30,000) 2 (Design and Contingencies - $50,000) 3 (18) SR 2005, Concrete Pavement 4 Reconstruction, Rehabilitation, Conway 5 Wallrose Road from Big Sewickley Creek 6 Road to Pfaff Road, Economy Borough 2,200,000 7 (Base Project Allocation - $2,000,000) 8 (Design and Contingencies - $200,000) 9 (19) SR 2005, Concrete Pavement 10 Reconstruction, Rehabilitation, Conway 11 Wallrose Road from Ridge Road Extension 12 to Pfaff Road, Economy Borough 528,000 13 (Base Project Allocation - $480,000) 14 (Design and Contingencies - $48,000) 15 (20) SR 2006, Concrete Pavement 16 Reconstruction, Rehabilitation, Golden 17 Grove Road from SR 4052 to Locust 18 Street, Economy Borough 598,000 19 (Base Project Allocation - $543,000) 20 (Design and Contingencies - $55,000) 21 (21) SR 30, Concrete Pavement 22 Reconstruction, Rehabilitation, Lincoln 23 Highway from West Virginia Line to Past 24 Red Dog Road, Greene Township 330,000 25 (Base Project Allocation - $300,000) 26 (Design and Contingencies - $30,000) 27 (22) SR 3005, Concrete Rehabilitation, 28 Reconstruct and Bituminous Overlay, 29 Chapel Road from Brodhead Road to 30 Frankfort Road, City of Aliquippa and 20080S1504B2454 - 30 -
1 Center and Hopewell Townships 1,667,000 2 (Base Project Allocation - $1,667,000) 3 (23) SR 3012, Concrete Rehabilitation, 4 Reconstruct and Bituminous Overlay, 5 Center Grange Road from Brodhead Road 6 to Monaca Road, Center Township 904,000 7 (Base Project Allocation - $904,000) 8 (24) SR 3014, Concrete Rehabilitation, 9 Reconstruct and Bituminous Overlay, 10 Golf Course Road from Mill Street to 11 Dead End, City of Aliquippa and Center 12 and Hopewell Townships 439,000 13 (Base Project Allocation - $439,000) 14 (25) SR 3016, Concrete Rehabilitation, 15 Reconstruct and Bituminous Overlay, 16 Green Garden Road from Frankfort Road 17 to Clearview Road, Raccoon Township 1,030,000 18 (Base Project Allocation - $1,030,000) 19 (26) SR 3036, Concrete Rehabilitation, 20 Reconstruct and Bituminous Overlay, 21 Gringo and Independence Road from 22 Bocktown Road to Independence Road, 23 Hopewell and Independence Townships 605,000 24 (Base Project Allocation - $605,000) 25 (27) SR 351, Concrete Rehabilitation, 26 Reconstruct and Bituminous Overlay, 27 Fairland Boulevard from SR 18 to SR 28 168, Big Beaver, Koppel and New Galilee 29 Boroughs 1,505,000 30 (Base Project Allocation - $1,417,000) 20080S1504B2454 - 31 -
1 (Land Allocation - $8,000) 2 (Design and Contingencies - $80,000) 3 (28) SR 4002, Concrete Rehabilitation, 4 Reconstruct and Bituminous Overlay, 5 Little Bower and Ander from Route 51 to 6 Lawrence County Line, Darlington 7 Township 923,000 8 (Base Project Allocation - $923,000) 9 (29) SR 4008, Concrete Pavement 10 Reconstruction, Rehabilitation, Braun 11 Road from Shenango Road to Route 51, 12 Chippewa and Patterson Townships 598,000 13 (Base Project Allocation - $543,000) 14 (Design and Contingencies - $55,000) 15 (30) SR 4011, Concrete Rehabilitation, 16 Reconstruct and Bituminous Overlay, 17 Elmbrook Road from SR 251 to McClain 18 Road, South Beaver Township 468,000 19 (Base Project Allocation - $468,000) 20 (31) SR 4016, Concrete Pavement 21 Reconstruction, Rehabilitation, Beaner 22 Hollow Road from Dutch Ridge Road to 23 Riverside Drive, Bridgewater Borough 24 and Brighton Township 501,000 25 (Base Project Allocation - $455,000) 26 (Design and Contingencies - $46,000) 27 (32) SR 4019, Concrete Rehabilitation, 28 Reconstruct and Bituminous Overlay, 29 Park Road from Brady's Run Road to 30 Blackhawk Road, Brighton and Chippewa 20080S1504B2454 - 32 -
1 Townships 1,121,000 2 (Base Project Allocation - $1,121,000) 3 (33) SR 4020, Concrete Rehabilitation, 4 Reconstruct and Bituminous Overlay, 5 Dutch Ridge Road from Tuscawaras Road 6 to Park Road, Brighton Township 910,000 7 (Base Project Allocation - $910,000) 8 (34) SR 4021, Concrete Rehabilitation, 9 Reconstruct and Bituminous Overlay, 10 Shenango Road from Braun Road to 11 Darlington Road, Chippewa Township 455,000 12 (Base Project Allocation - $455,000) 13 (35) SR 4028, Concrete Rehabilitation, 14 Reconstruct and Bituminous Overlay, 15 Tuscawaras Road from Fairview Road to 16 Georgetown Lane, Ohioville Borough, 17 Brighton and Vanport Townships 3,250,000 18 (Base Project Allocation - $3,250,000) 19 (36) SR 4045, Concrete Pavement 20 Reconstruction, Rehabilitation, Murphy 21 Hill Road from Midland Avenue to 22 Sunrise Drive, Industry and Midland 23 Boroughs 330,000 24 (Base Project Allocation - $300,000) 25 (Design and Contingencies - $30,000) 26 (37) SR 51, Concrete Pavement 27 Reconstruction, Rehabilitation, Penna 28 Avenue Eastbound from SR 251 to SR 168, 29 Chippewa and South Beaver Townships 3,300,000 30 (Base Project Allocation - $3,000,000) 20080S1504B2454 - 33 -
1 (Design and Contingencies - $300,000) 2 (38) SR 51, Concrete Pavement 3 Reconstruction, Rehabilitation, Penna 4 Avenue Westbound from SR 251 to SR 168, 5 Chippewa and South Beaver Townships 3,300,000 6 (Base Project Allocation - $3,000,000) 7 (Design and Contingencies - $300,000) 8 (39) SR 51, Concrete Pavement 9 Reconstruction, Rehabilitation, Penna 10 Avenue from SR 168 to Taggert Road, 11 Chippewa, Darlington and South Beaver 12 Townships 4,950,000 13 (Base Project Allocation - $4,500,000) 14 (Design and Contingencies - $450,000) 15 (40) SR 51, Concrete Pavement 16 Reconstruction, Rehabilitation, Penna 17 Avenue Westbound from SR 168 to Taggert 18 Road, Chippewa, Darlington and South 19 Beaver Townships 4,950,000 20 (Base Project Allocation - $4,500,000) 21 (Design and Contingencies - $450,000) 22 (41) SR 60, Concrete Rehabilitation, 23 Reconstruction, SR 60 from Chippewa to 24 Vanport, Brighton, Chippewa and Vanport 25 Townships 3,851,000 26 (Base Project Allocation - $3,426,000) 27 (Design and Contingencies - $425,000 28 (42) SR 60, Concrete Rehabilitation, 29 Reconstruction, SR 60 from Vanport to 30 Center Township, Center, Potter and 20080S1504B2454 - 34 -
1 Vanport Townships 2,035,000 2 (Base Project Allocation - $1,850,000) 3 (Design and Contingencies - $185,000) 4 (43) SR 60, Concrete Rehabilitation, 5 Reconstruction, SR 60, I-376, Part 6, 6 Northbound Segment 0030 to Segment 0010 7 and Southbound Segment 0031 to Segment 8 0011, Hopewell and Independence 9 Townships 1,353,000 10 (Base Project Allocation - $1,230,000) 11 (Design and Contingencies - $123,000) 12 (44) SR 60, Reconstruction, Interchanges, 13 Safety Features and Crossovers 14 Upgrades, SR 60, Allegheny County Line 15 to SR 60 Toll Road, Various 16 Municipalities 16,500,000 17 (Base Project Allocation - $15,000,000) 18 (Design and Contingencies - $1,500,000) 19 (45) SR 65, Safety Improvement, SR 65 from 20 Baden to Rochester, Baden Borough 193,000 21 (Base Project Allocation - $175,000) 22 (Design and Contingencies - $18,000) 23 (46) SR 65, Concrete Pavement 24 Reconstruction, Rehabilitation, SR 65 25 Northbound, French Point Bridge to 26 Tevebaugh Road, Baden and Economy 27 Boroughs and Harmony Township 2,309,000 28 (Base Project Allocation - $2,280,000) 29 (Design and Contingencies - $29,000) 30 (47) SR 65, Concrete Pavement 20080S1504B2454 - 35 -
1 Reconstruction, Rehabilitation, SR 65 2 Southbound, French Point Bridge to 3 Tevebaugh Road, Baden and Economy 4 Boroughs and Harmony Township 2,563,000 5 (Base Project Allocation - $2,328,000) 6 (Design and Contingencies - $235,000) 7 (48) SR 65, Concrete Pavement 8 Reconstruction, Rehabilitation, Mercer 9 Road from Fifth Avenue to Fourth 10 Street, New Brighton Borough 330,000 11 (Base Project Allocation - $300,000) 12 (Design and Contingencies - $30,000) 13 (49) SR 68, Concrete Rehabilitation, 14 Reconstruct and Bituminous Overlay, SR 15 68 from SR 1039 to New Pavement, 16 Daugherty, New Sewickley and Rochester 17 Townships 1,261,000 18 (Base Project Allocation - $1,261,000) 19 (50) SR 68, Concrete Rehabilitation, 20 Reconstruct and Bituminous Overlay, SR 21 68 from Wolfes Run Road to Kinder 22 Morgan Terminals, Industry Borough 163,000 23 (Base Project Allocation - $163,000) 24 (51) SR 68, Concrete Rehabilitation, 25 Concrete Pavement Reconstruction, 26 Rehabilitation, 68 Montrose Drive to 27 Butler County Line, Marion and New 28 Sewickley Townships 580,000 29 (Base Project Allocation - $513,000) 30 (Land Allocation - $3,000) 20080S1504B2454 - 36 -
1 (Design and Contingencies - $64,000) 2 (52) SR 68, Concrete Pavement 3 Reconstruction, Rehabilitation, 4 Virginia Avenue from SR 1024 to SR 5 1039, Rochester Borough and Rochester 6 Township 330,000 7 (Base Project Allocation - $300,000) 8 (Design and Contingencies - $30,000) 9 (53) Various, Retaining Walls and Slide 10 Corrections 80,000 11 (Land Allocation - $80,000) 12 Section 305. Bedford County. 13 Projects are as follows: 14 (1) SR 70, Restoration, Rehabilitation, 15 Safety Improvements, I-70, Breezewood 16 to Fulton County Line, East Providence 17 Township 850,000 18 (Base Project Allocation - $850,000) 19 (2) I-70, Interstate Restoration and 20 Reconstruction 3,500,000 21 (Base Project Allocation - $3,500,000) 22 (3) I-99, Interstate Restoration and 23 Reconstruction 14,000,000 24 (Base Project Allocation - $14,000,000) 25 (4) SR 26, Intersection Improvement, 26 Safety Improvement 845,000 27 (Base Project Allocation - $700,000) 28 (Land Allocation - $100,000) 29 (Design and Contingencies - $45,000) 30 (5) SR 4009, Widen, Resurface and 20080S1504B2454 - 37 -
1 Intersection Improvements, 2 Signalization 465,000 3 (Base Project Allocation - $465,000) 4 (6) SR 1007, Concrete Pavement Restoration 5 and Overlay 6,600,000 6 (Base Project Allocation - $6,600,000) 7 (7) SR 220, Overlay and Shoulder Upgrade 1,526,000 8 (Base Project Allocation - $1,526,000) 9 (8) SR 30, Concrete Pavement Restoration 10 and Overlay 769,000 11 (Base Project Allocation - $769,000) 12 (9) SR 30, Concrete Pavement Restoration 13 and Overlay and Upgrade Drainage 4,900,000 14 (Design and Contingencies - $4,900,000 15 (10) SR 56, Concrete Pavement Restoration 16 and Overlay 2,250,000 17 (Base Project Allocation - $2,250,000) 18 Section 306. Berks County. 19 Projects are as follows: 20 (1) SR 1010, Intersection Signalization, 21 SR 1010 and Dries Road Intersection, 22 Ontelaunee Township 200,000 23 (Base Project Allocation - $50,000) 24 (Design and Contingencies - $150,000) 25 (2) SR 1021, Safety Improvement, Tree 26 Cutting, Excavating and Shoulder Work, 27 SR 1021 and SR 1024, Long Lane 28 Intersection, Maxatawny Township 325,000 29 (Base Project Allocation - $75,000) 30 (Design and Contingencies - $250,000) 20080S1504B2454 - 38 -
1 (3) SR 12, Excavating, Embankment, 2 Shoulders, Guide Rail and Utility 3 Poles, SR 12, Safety Improvements, 4 Alsace Township 600,000 5 (Base Project Allocation - $100,000) 6 (Design and Contingencies - $500,000) 7 (4) SR 222, Highway Reconstruction, SR 8 222, North Corridor Phase I, 9 Maidencreek, Ontelaunee and Richmond 10 Townships 36,600,000 11 (Base Project Allocation - $30,600,000) 12 (Land Allocation - $2,800,000) 13 (Design and Contingencies - $3,200,000) 14 (5) SR 222, Install Closed Circuit 15 Television Cameras, Route 222, Nonurban 16 Area, Various Municipalities 1,124,000 17 (Base Project Allocation - $254,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $850,000) 20 (6) SR 222 and SR 422, Installation of 21 Dynamic Message Signs, SR 222 and SR 22 422, Nonurban Area, Various 23 Municipalities 410,000 24 (Base Project Allocation - $250,000) 25 (Land Allocation - $15,000) 26 (Design and Contingencies - $145,000) 27 (7) SR 222 and SR 422, Installation of 28 Variable Message Signs and Closed 29 Circuit Television Cameras, SR 222 and 30 SR 422 Urban Area, Various 20080S1504B2454 - 39 -
1 Municipalities 390,000 2 (Base Project Allocation - $225,000) 3 (Land Allocation - $15,000) 4 (Design and Contingencies - $150,000) 5 (8) SR 3008, Intersection Improvement and 6 Curve Safety Improvements, SR 3008, 7 Segment 50 to Segment 60, Lower 8 Heidelberg and North Heidelberg 9 Townships 300,000 10 (Base Project Allocation - $75,000) 11 (Design and Contingencies - $225,000) 12 (9) SR 3023, Curve Safety Improvements, SR 13 3023, Vicinity of Evans Hill Road and 14 Sweitzer Road, Lower Heidelberg 15 Township 300,000 16 (Base Project Allocation - $75,000) 17 (Design and Contingencies - $225,000) 18 (10) SR 422, Congestion Reduction, Safety 19 Improvements, Penn Avenue, SR 422 20 Corridor, Robesonia, Sinking Spring and 21 Wernersville Boroughs, Heidelberg, 22 Lower Heidelberg and South Heidelberg 23 Townships 360,000 24 (Base Project Allocation - $285,000) 25 (Land Allocation - $15,000) 26 (Design and Contingencies - $60,000) 27 (11) SR 562, Intersection Improvement, 28 Congestion Mitigation, SR 562, 29 Intersection of Shelbourne Road, 30 Boyertown Pike and Oley Turnpike Road, 20080S1504B2454 - 40 -
1 Exeter and Oley Townships 400,000 2 (Base Project Allocation - $100,000) 3 (Land Allocation - $40,000) 4 (Design and Contingencies - $260,000) 5 (12) SR 78, Replacement of Precast 6 Parapets, RATS Precast Parapets, 7 Greenwich Township 475,000 8 (Base Project Allocation - $20,000) 9 (Design and Contingencies - $455,000) 10 (13) SR 78, Safety Gates, SR 78 Corridor, 11 Various Municipalities 525,000 12 (Base Project Allocation - $525,000) 13 (14) SR 78, Installation of Closed Circuit 14 Television Cameras, Highway Advisory 15 Radio, Changeable Message Signs, I-78 16 Corridor and SR 61 into I-78 17 Intersection, Various Municipalities 490,000 18 (Base Project Allocation - $360,000) 19 (Land Allocation - $15,000) 20 (Design and Contingencies - $115,000) 21 (15) SR 78, Install Tenth Mile Location 22 Markers, Safety Improvement, I-78 23 Corridor, Various Municipalities 102,000 24 (Base Project Allocation - $7,000) 25 (Design and Contingencies - $95,000) 26 (16) I-176, Interstate Restoration and 27 Reconstruction 11,100,000 28 (Base Project Allocation - $11,100,000) 29 (17) I-78, Interstate Restoration and 30 Reconstruction 38,500,000 20080S1504B2454 - 41 -
1 (Base Project Allocation - $38,500,000) 2 (18) SR 183, Intersection Improvement 268,000 3 (Base Project Allocation - $111,000) 4 (Land Allocation - $52,000) 5 (Design and Contingencies - $105,000) 6 (19) SR 82, Highway Restoration 1,500,000 7 (Base Project Allocation - $1,500,000) 8 (20) SOUTH 9TH STREET EXTENSION, NEW <-- 9 CONSTRUCTION AND INTERSECTION, 1.5 10 MILES, SR 0422 TO LAUREL STREET, CITY 11 OF READING, CUMRU TOWNSHIP AND EXETER 12 TOWNSHIP 61,250,000 13 (BASE PROJECT ALLOCATION - $46,250,000) 14 (LAND ALLOCATION - $11,000,000) 15 (DESIGN AND CONTINGENCIES - $4,000,000) 16 Section 307. Blair County. 17 Projects are as follows: 18 (1) SR 1001, Widen, Add Lane, Pleasant 19 Valley Boulevard, City of Altoona 264,000 20 (Base Project Allocation - $192,500) 21 (Land Allocation - $11,500) 22 (Design and Contingencies - $60,000) 23 (2) SR 1008, Park and Ride Lot, Antis 24 Township Park and Ride, Adjacent to 25 PennDOT Stockpile, Antis Township 118,000 26 (Base Project Allocation - $93,000) 27 (Design and Contingencies - $25,000) 28 (3) SR 1012, Park and Ride Lot, Tenth 29 Street Park and Ride, Under Bridge at 30 SR 99, Tyrone Borough, Snyder Township 478,000 20080S1504B2454 - 42 -
1 (Base Project Allocation - $253,000) 2 (Land Allocation - $25,000) 3 (Design and Contingencies - $200,000) 4 (4) SR 3013, Construct Center Turn Lane, 5 Dunnings Highway Corridor, Pine Run to 6 South of Walnut Street Intersection, 7 Greenfield Township 489,000 8 (Base Project Allocation - $400,000) 9 (Land Allocation - $11,000) 10 (Design and Contingencies - $78,000) 11 (5) SR 36, Increase Clearance beneath I- 12 99, PA 36 under I-99, Logan Township 13 and City of Altoona 300,000 14 (Base Project Allocation - $300,000) 15 (6) SR 4019, Safety Improvement 16 Relocation, Realignment, Pinecroft 17 Curves, Antis Township 1,740,000 18 (Base Project Allocation - $1,620,000) 19 (Design and Contingencies - $120,000) 20 (7) SR 8004, Ramps, Restoration, 21 Rehabilitation, Safety Improvements, I- 22 99, US 22 and PA 764 Interchanges, 23 Allegheny Township 400,000 24 (Base Project Allocation - $400,000) 25 (8) SR 8023, Pavement Restoration, Safety 26 Improvements, I-99, Blair County Ramps, 27 Allegheny, Antis, Freedom, Greenfield, 28 Logan and Snyder Townships 500,000 29 (Base Project Allocation - $500,000) 30 (9) SR 99, Restoration, Rehabilitation, 20080S1504B2454 - 43 -
1 Safety Improvements, I-99, Plank Road 2 to Frankstown Road, Logan Township and 3 City of Altoona 480,000 4 (Base Project Allocation - $480,000) 5 (10) SR 99, Pavement Restoration and 6 Rehabilitation, I-99, Sproul-Newry 7 Pull-Off, Milepost 17 to East Freedom 8 Interchange, Freedom and Greenfield 9 Townships 1,750,000 10 (Base Project Allocation - $1,750,000) 11 (11) I-99, Interstate Restoration and 12 Reconstruction 37,110,000 13 (Base Project Allocation - $37,110,000) 14 (12) SR 1021, New Roadway, Interchange 15 Improvement 745,000 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $725,000) 18 (13) SR 22, Concrete Rehabilitation, 19 Guiderail and Drainage Improvements 2,133,000 20 (Base Project Allocation - $2,133,000) 21 (14) SR 22, Add Lane 100,000 22 (Land Allocation - $100,000) 23 (15) SR 866, Highway Rehabilitation, 24 Resurfacing, Shoulder Improvement 400,000 25 (Base Project Allocation - $400,000) 26 (16) SR 350, Concrete Pavement Restoration 27 and Overlay 2,500,000 28 (Base Project Allocation - $2,500,000) 29 (17) SR 36, Concrete Pavement Restoration 30 and Overlay 2,825,000 20080S1504B2454 - 44 -
1 (Base Project Allocation - $2,825,000) 2 (18) SR 36, Replace Existing Metal Arch 3 Pipe with a Box Culvert 950,000 4 (Base Project Allocation - $950,000) 5 (19) SR 4013, Phase I, Intersection 6 Improvement and Widening 1,500,000 7 (Design and Contingencies - $1,500,000) 8 (20) SR 4017, Concrete Pavement 9 Restoration and Overlay 2,165,000 10 (Base Project Allocation - $2,165,000) 11 (21) SR 453, Concrete Pavement Restoration 12 and Overlay 1,350,000 13 (Base Project Allocation - $1,350,000) 14 (22) SR 764, Concrete Pavement Restoration 15 and Overlay 1,900,000 16 (Base Project Allocation - $1,900,000) 17 Section 308. Bradford County. 18 Projects are as follows: 19 (1) SR 1043, Slide Repairs, Sheshequin 20 Slides, SR 1043, Segment 0220 to 21 Segment 0230, Athens and Sheshequin 22 Townships 2,040,000 23 (Base Project Allocation - $1,780,000) 24 (Land Allocation - $40,000) 25 (Design and Contingencies - $220,000) 26 (2) SR 220, Safety Improvement, Tracy Road 27 to T-624, Albany Township 113,000 28 (Base Project Allocation - $80,000) 29 (Land Allocation - $6,000) 30 (Design and Contingencies - $27,000) 20080S1504B2454 - 45 -
1 (3) SR 467, Slide Repairs, SR 467, Segment 2 20 and Segment 180, Pike and Rome 3 Townships 980,000 4 (Base Project Allocation - $840,000) 5 (Land Allocation - $20,000) 6 (Design and Contingencies - $120,000) 7 (4) SR 6, Safety Improvement and 8 Resurface, Tracy Road to T-624, 9 Standing Stone Township 440,000 10 (Base Project Allocation - $400,000) 11 (Design and Contingencies - $40,000) 12 (5) SR 6, Intersection Improvement, SR 6 13 and SR 2010 Intersection, Wyalusing 14 Township 975,000 15 (Base Project Allocation - $975,000) 16 (6) SR 220, Resurfacing, Restoration 2,890,000 17 (Base Project Allocation - $2,850,000) 18 (Land Allocation - $40,000) 19 (7) SR 220, Resurfacing, Restoration 630,000 20 (Base Project Allocation - $600,000) 21 (Land Allocation - $30,000) 22 (8) SR 220, Highway Restoration 4,570,000 23 (Base Project Allocation - $4,500,000) 24 (Land Allocation - $40,000) 25 (Design and Contingencies - $30,000) 26 (9) SR 3016, Resurfacing, Restoration 509,000 27 (Base Project Allocation - $484,000) 28 (Land Allocation - $25,000) 29 (10) SR 4024, Resurfacing, Restoration 1,510,000 30 (Base Project Allocation - $1,500,000) 20080S1504B2454 - 46 -
1 (Land Allocation - $10,000) 2 (11) SR 4031, Resurfacing, Restoration 1,254,000 3 (Base Project Allocation - $1,200,000) 4 (Land Allocation - $54,000) 5 (12) SR 4039, Resurfacing, Restoration 2,286,000 6 (Base Project Allocation - $2,180,000) 7 (Land Allocation - $106,000) 8 Section 309. Bucks County. 9 Projects are as follows: 10 (1) SR 202, Relocation, Realignment, US 11 202, Pickertown Road to PA 611, 12 Doylestown Township 87,058,000 13 (Base Project Allocation - $49,600,000) 14 (Land Allocation - $19,943,000) 15 (Design and Contingencies - 16 $17,515,000) 17 (2) SR 202, Wetland Replacement 18 Environmental Mitigation, US 202, 19 Section 700 Wetland Mitigation, New 20 Britain Township 16,070,000 21 (Base Project Allocation - $5,600,000) 22 (Land Allocation - $1,850,000) 23 (Design and Contingencies - $8,620,000) 24 (3) Bridgetown Interconnect Project, 25 including certain interconnection, new 26 signals and widening, Lower Southampton 27 Township 3,210,000 28 (Base Project Allocation - $3,210,000) 29 (4) I-95, Interstate Restoration and 30 Reconstruction 18,000,000 20080S1504B2454 - 47 -
1 (Base Project Allocation - $18,000,000) 2 (5) SR 2018, Intersection Improvement, 3 Widen and Provide Left Lane 600,000 4 (Base Project Allocation - $600,000) 5 (6) SR 202, Intersection Improvement, to 6 Include Left Turn Lane 230,000 7 (Land Allocation - $100,000) 8 (Design and Contingencies - $130,000) 9 (7) SR 2029, Intersection Improvement, Add 10 Turn Lanes 2,000,000 11 (Base Project Allocation - $2,000,000) 12 (8) SR 2033, Widen, Additional Lanes 485,000 13 (Base Project Allocation - $485,000) 14 (9) SR 2038, Widen, Additional Lanes 4,000,000 15 (Base Project Allocation - $4,000,000) 16 (10) SR 2038, Widen From Two to Four Lanes 17 With Turning Lanes, Associated 18 Improvements, Signal Upgrade 2,309,000 19 (Base Project Allocation - $1,369,000) 20 (Land Allocation - $120,000) 21 (Design and Contingencies - $820,000) 22 (11) SR 4033, Reconstruct - Including 23 Curbs, Sidewalks and Drainage 1,400,000 24 (Base Project Allocation - $1,400,000) 25 Section 310. Butler County. 26 Projects are as follows: 27 (1) SR 228, Additional Lanes, Realignment, 28 Simon Properties Project, PA 228 from 29 SR 3020, Freedom Road, to SR 3021, 30 Franklin Road, Cranberry Township 19,750,000 20080S1504B2454 - 48 -
1 (Base Project Allocation - $16,080,000) 2 (Land Allocation - $3,470,000) 3 (Design and Contingencies - $200,000) 4 (2) SR 488, Park and Ride Lot Expansion, 5 I-79 at PA 488, Park-N-Ride, 6 Portersville Borough 83,000 7 (Base Project Allocation - $77,000) 8 (Design and Contingencies - $6,000) 9 (3) SR 79, Restoration, I-79, Allegheny 10 County Line to SR 3025 Interchange, 11 Cranberry and Jackson Townships 675,000 12 (Base Project Allocation - $650,000) 13 (Design and Contingencies - $25,000) 14 (4) SR 79, Restoration, I-79, SR 3025 15 Interchange to PA 488 Interchange, 16 Jackson, Lancaster and Muddycreek 17 Townships 675,000 18 (Base Project Allocation - $650,000) 19 (Design and Contingencies - $25,000) 20 (5) SR 79, Restoration, I-79, PA 488 21 Interchange to Lawrence County Line, 22 Muddycreek and Worth Townships 675,000 23 (Base Project Allocation - $650,000) 24 (Design and Contingencies - $25,000) 25 (6) I-79, Interstate Restoration and 26 Reconstruction 26,800,000 27 (Base Project Allocation - $26,800,000) 28 (7) I-80, Interstate Restoration and 29 Reconstruction 1,700,000 30 (Base Project Allocation - $1,700,000) 20080S1504B2454 - 49 -
1 (8) SR 422, Pavement Reconstruction and 2 Rehabilitation 260,000 3 (Base Project Allocation - $260,000) 4 (9) SR 422, Pavement Reconstruction and 5 Rehabilitation 260,000 6 (Base Project Allocation - $260,000) 7 (10) SR 422, Pavement Reconstruction and 8 Rehabilitation 1,320,000 9 (Base Project Allocation - $1,320,000) 10 (11) SR 422, Pavement Reconstruction and 11 Rehabilitation 840,000 12 (Base Project Allocation - $840,000) 13 Section 311. Cambria County. 14 Projects are as follows: 15 (1) SR 1021, Roadway Realignment, Safety 16 Improvement, Preloh Hill Curve 17 beginning at the Intersection with 18 Stoltz Road, T-523, and Continues East 19 0.5 Mile, Clearfield Township 255,000 20 (Base Project Allocation - $185,000) 21 (Land Allocation - $19,000) 22 (Design and Contingencies - $51,000) 23 (2) SR 22, Highway Reconstruction, 24 Concrete Rehabilitation, Mundys Corner 25 to T-418, Cambria and Jackson 26 Townships 3,550,000 27 (Base Project Allocation - $3,400,000) 28 (Design and Contingencies - $150,000) 29 (3) SR 3007, Traffic Studies Safety 30 Improvement, Goucher Street from 20080S1504B2454 - 50 -
1 Menoher Boulevard, PA 271, Intersection 2 to Westgate Drive, T-377, Westmont 3 Borough and Lower Yoder Township 751,000 4 (Base Project Allocation - $555,0000) 5 (Land Allocation - $96,000) 6 (Design and Contingencies - $100,000) 7 (4) SR 56, Various Safety and Mobility 8 Improvements, PA 56 West Corridor, 9 Lower Yoder Township Line to 10 Intersection of Washington Street, City 11 of Johnstown 950,000 12 (Base Project Allocation - $630,000) 13 (Land Allocation - $140,000) 14 (Design and Contingencies - $180,000) 15 (5) SR 869, Roadway Realignment, Curve 16 Adjustment Safety Improvement, Beaver 17 Run Curve from Forest Street, T-503, to 18 Village of Beaverdale, Adams and Croyle 19 Townships 360,000 20 (Base Project Allocation - $300,000) 21 (Land Allocation - $30,000) 22 (Design and Contingencies - $30,000) 23 (6) SR 219, Concrete Pavement Restoration 24 and Overlay 1,620,000 25 (Base Project Allocation - $1,620,000) 26 (7) SR 219, Concrete Pavement Restoration 27 and Overlay 6,875,000 28 (Design and Contingencies - $6,875,000) 29 (8) SR 219, Concrete Pavement Restoration 30 and Overlay 4,000,000 20080S1504B2454 - 51 -
1 (Design and Contingencies - $4,000,000) 2 (9) SR 22, Concrete Pavement Restoration 3 and Overlay 3,000,000 4 (Base Project Allocation - $3,000,000) 5 (10) SR 22, Concrete Pavement Restoration 6 and Overlay 8,228,000 7 (Base Project Allocation - $8,228,000) 8 (11) SR 3024, Resurfacing and 9 Reconstruction of Retaining Wall 10 System 2,250,000 11 (Design and Contingencies - $2,250,000) 12 Section 312. Cameron County (Reserved). 13 Section 313. Carbon County. 14 Projects are as follows: 15 (1) SR 80, Install Dynamic Message Signs 16 and Closed Circuit Television Cameras, 17 I-80 Corridor, Round 1, Various 18 Municipalities 420,000 19 (Base Project Allocation - $200,000) 20 (Design and Contingencies - $220,000) 21 (2) SR 80, Install Dynamic Message Signs, 22 Closed Circuit Television Cameras, 23 Highway Advisory Radio and Highway 24 Advisory Radio Beacons, I-80 Corridor, 25 Round 2, Various Municipalities 390,000 26 (Base Project Allocation - $205,000) 27 (Design and Contingencies - $185,000) 28 (3) SR 8004, Lengthen Ramp, Rumble Strips, 29 White Topping, Flashing Warning Device, 30 I-80 Off Ramp Extension, East Side 20080S1504B2454 - 52 -
1 Borough 550,000 2 (Base Project Allocation - $250,000) 3 (Land Allocation - $150,000) 4 (Design and Contingencies - $150,000) 5 (4) SR 80, Installation of 0.10 Milepost 6 Markers on Interstates and Expressways, 7 NEPA Mile Post Markers, Various 8 Municipalities 304,000 9 (Base Project Allocation - $13,000) 10 (Design and Contingencies - $291,000) 11 (5) I-80, Interstate Restoration and 12 Reconstruction 9,600,000 13 (Base Project Allocation - $9,600,000) 14 (6) Various, Rehabilitation, Restoration 15 or Reconstruction of Various Highways 12,175,000 16 (Base Project Allocation - $9,131,000) 17 (Land Allocation - $3,044,000) 18 Section 314. Centre County. 19 Projects are as follows: 20 (1) SR 144, Retaining Wall Reconstruction, 21 Linn Street, Section 320, Bellefonte 22 Borough 1,400,000 23 (Base Project Allocation - $1,400,000) 24 (2) SR 26, Safety Improvement, Pine Grove 25 Mountain, Ferguson Township 260,000 26 (Base Project Allocation - $210,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $40,000) 29 (3) SR 3018, Safety Improvement, Atherton 30 and University Drive, State College 20080S1504B2454 - 53 -
1 Borough 1,175,000 2 (Base Project Allocation - $1,000,000) 3 (Land Allocation - $75,000) 4 (Design and Contingencies - $100,000) 5 (4) SR 322, Safety Improvement and 6 Congestion Reduction, US 322 Corridor 7 Safety Improvement, Harris and Potter 8 Townships 360,000 9 (Base Project Allocation - $300,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $50,000) 12 (5) SR 350, Safety Improvement, SR 350 13 Curve Improvement and Truck Pull Off, 14 Rush and Taylor Townships 925,000 15 (Base Project Allocation - $800,00) 16 (Land Allocation - $25,000) 17 (Design and Contingencies - $100,000) 18 (6) SR 45, Highway Restoration, Add 19 Turning Lane, Turn Lane at SR 45 and SR 20 144, Potter Township 5,140,000 21 (Base Project Allocation - $3,640,000) 22 (Land Allocation - $1,300,000) 23 (Design and Contingencies - $200,000) 24 (7) SR 550, Add Third Lane, Congestion 25 Reduction, PA 550 Third Segment 440, 26 Bellefonte Borough and Spring Township 4,325,000 27 (Base Project Allocation - $3,245,000) 28 (Land Allocation - $545,000) 29 (Design and Contingencies - $535,000) 30 (8) SR 80, Acid Rock Discharge Mitigation, 20080S1504B2454 - 54 -
1 Jonathan Run, I-80 and SR 144, Boggs 2 and Snow Shoe Townships 1,320,000 3 (Base Project Allocation - $1,300,000) 4 (Land Allocation - $20,000) 5 (9) SR 80, Pavement Restoration, 6 Rehabilitation, Interstate Improvement, 7 I-80 Corridor, Boggs, Rush and Snow 8 Shoe Townships 1,530,000 9 (Base Project Allocation - $1,500,000) 10 (Design and Contingencies - $30,000) 11 (10) Various Routes, Regional ITS 12 Initiatives, Regional ITS Operations 13 Plan, Various Municipalities 500,000 14 (Base Project Allocation - $500,000) 15 (11) SR 3014, Retiming and Coordinating of 16 18 Signals, Safety Improvement, 17 Atherton Street Corridor, Valley Vista 18 to Beaver Avenue, State College Borough 19 and Ferguson and Patton Townships 400,000 20 (Base Project Allocation - $300,000) 21 (Land Allocation - $25,000) 22 (Design and Contingencies - $75,000) 23 (12) I-80, Interstate Restoration and 24 Reconstruction 31,800,000 25 (Base Project Allocation - $31,800,000) 26 (13) SR 150, Congested Corridor 27 Improvements, Safety Improvements 1,237,000 28 (Base Project Allocation - $1,143,000) 29 (Land Allocation - $52,000) 30 (Design and Contingencies - $42,000) 20080S1504B2454 - 55 -
1 (14) SR 45, Park and Ride Lot 777,000 2 (Base Project Allocation - $672,000) 3 (Land Allocation - $42,000) 4 (Design and Contingencies - $63,000) 5 (15) I-80/US 220 AND PA 226, NEW I-80 <-- 6 INTERCHANGE, MARION TOWNSHIP 45,240,000 7 (BASE PROJECT ALLOCATION - $45,240,000) 8 (16) I-80 AND I-99, I-80/US 220, I-99, PA 9 26, SR 1008, T427, NEW INTERCHANGE, 10 MARION AND SPRING TOWNSHIPS 110,864,000 11 (BASE PROJECT ALLOCATION - 12 $110,864,000) 13 (17) US ROUTE 322, APPALACHIAN THRUWAY 14 CORRIDOR O, FROM I-99 TO I-80, NEW 15 CONSTRUCTION, POTTER AND HARRIS 16 TOWNSHIPS 400,000,000 17 (BASE PROJECT ALLOCATION - 18 $400,000,000) 19 SECTION 314.1. CENTRE AND CLEARFIELD COUNTIES. 20 PROJECTS ARE AS FOLLOWS: 21 (1) US ROUTE 322, SEVEN MOUNTAINS TO 22 BOALSBURG, NEW CONSTRUCTION, FROM I-99 23 TO I-80, WORTH, RUSH, MORRIS, COOPER 24 AND GRAHAM TOWNSHIPS 625,000,000 25 (BASE PROJECT ALLOCATION - 26 $625,000,000) 27 Section 315. Chester County. 28 Projects are as follows: 29 (1) SR 30, Reconstruction, US 30, PA 10 to 30 Exton Bypass, Various Municipalities 80,515,000 20080S1504B2454 - 56 -
1 (Base Project Allocation - $77,200,000) 2 (Land Allocation - $1,000,000) 3 (Design and Contingencies - $2,315,000) 4 (2) SR 1, Add Lanes and Widen to Six 5 Lanes 3,800,000 6 (Base Project Allocation - $3,800,000) 7 (3) SR 100, Widen and Add Lanes, to 8 Provide Three Lanes Northbound and 9 Southbound 21,586,000 10 (Base Project Allocation - $21,586,000) 11 (4) SR 29, Add Lane 5,370,000 12 (Base Project Allocation - $5,370,000) 13 (5) SR 30, Intersection Improvement, Add 14 Turn Lanes, Widen and Signals 700,000 15 (Base Project Allocation - $700,000) 16 (6) SR 41, Reconstruct - Transportation 17 Study 10,000,000 18 (Base Project Allocation - $8,000,000) 19 (Land Allocation - $2,000,000) 20 (7) SR 52, Relocation, New Roadway 3,800,000 21 (Base Project Allocation - $3,800,000) 22 (8) US 30, Pedestrian Facilities - 23 Realignment and Widening to Accommodate 24 Proposed Relocation 600,000 25 (Land Allocation - $600,000) 26 Section 316. Clarion County. 27 Projects are as follows: 28 (1) I-81, Preventive Maintenance, PA 478 29 Interchange to SR 3007 Interchange, 30 Clarion, West I-80, Mill and Fill, 20080S1504B2454 - 57 -
1 Beaver and Richland Townships 480,000 2 (Base Project Allocation - $450,000) 3 (Design and Contingencies - $30,000) 4 (2) SR 322, Drainage, Curbing, 5 Restoration, US 322 from SR 208 to 6 Station Road, Shippenville Borough and 7 Elk Township 850,000 8 (Base Project Allocation - $850,000) 9 (3) I-80, Interstate Restoration and 10 Reconstruction 27,800,000 11 (Base Project Allocation - $27,800,000) 12 (4) SR 208, Safety and Intersection 13 Improvements - Add Turning Lanes and 14 Install a New Signal 182,000 15 (Base Project Allocation - $173,000) 16 (Design and Contingencies - $9,000) 17 (5) SR 322, Pavement Reconstruction and 18 Rehabilitation 360,000 19 (Base Project Allocation - $360,000) 20 (6) SR 66, Pavement Reconstruction and 21 Rehabilitation 1,580,000 22 (Base Project Allocation - $1,580,000) 23 Section 317. Clearfield County. 24 Projects are as follows: 25 (1) SR 219, Realignment and Signal 26 Installation, Intersection of SR 219 27 and SR 119, Brady Township 225,000 28 (Base Project Allocation - $160,000) 29 (Land Allocation - $25,000) 30 (Design and Contingencies - $40,000) 20080S1504B2454 - 58 -
1 (2) SR 255, Signal Timing Project 2 Improvements at 12 Signalized 3 Intersections, DuBois Avenue from 4 DuBois Street to DuBois Mall, Sandy 5 Township and City of DuBois 1,084,000 6 (Base Project Allocation - $695,000) 7 (Land Allocation - $286,000) 8 (Design and Contingencies - $103,000) 9 (3) SR 53, Resurfacing, Signal, Add 10 Turning Lane, Ninth Street 11 Intersection, SR 53 and SR 2043, Morris 12 Township 800,000 13 (Base Project Allocation - $650,000) 14 (Land Allocation - $50,000) 15 (Design and Contingencies - $100,000) 16 (4) SR 53, Center Line Rumble Strips, 17 Safety Improvement, SR 53 Corridor, 18 Various Municipalities 54,000 19 (Base Project Allocation - $54,000) 20 (5) Various Routes, Regional ITS 21 Initiatives, Regional ITS Operations 22 Plan, Various Municipalities 500,000 23 (Base Project Allocation - $500,000) 24 (6) I-80, Interstate Restoration and 25 Reconstruction 41,200,000 26 (Base Project Allocation - $41,200,000) 27 (7) SR 4019, Reconstruction, Realigning of 28 Hospital Avenue to the West 450,000 29 (Base Project Allocation - $450,000) 30 Section 318. Clinton County. 20080S1504B2454 - 59 -
1 Projects are as follows: 2 (1) SR 220, New Interchange with Bridge 3 and Safety Improvements, Auction Road, 4 SR 220, Segment 30 and SR 2008, Segment 5 50, Lamar Township 925,000 6 (Base Project Allocation - $800,000) 7 (Land Allocation - $25,000) 8 (Design and Contingencies - $100,000) 9 (2) Various Routes, Regional ITS 10 Initiatives, Regional ITS Operations 11 Plan, Various Municipalities 500,000 12 (Base Project Allocation - $500,00) 13 (3) SR 80, Pavement Restoration, 14 Rehabilitation and Bridge Parapets, I- 15 80 Corridor, Greene, Lamar, Marion and 16 Porter Townships 2,530,000 17 (Base Project Allocation - $2,500,000) 18 (Design and Contingencies - $30,000) 19 (4) SR 120, Access Road for First Quality 20 Tissue Plant, Castenea Township and 21 Lock Haven City 8,750,000 22 (Base Project Allocation - $8,000,000) 23 (Land Allocation - $500,000) 24 (Design and Contingencies - $250,000) 25 (5) I-80, Interstate Restoration and 26 Reconstruction 23,500,000 27 (Base Project Allocation - $23,500,000) 28 Section 319. Columbia County. 29 Projects are as follows: 30 (1) SR 11, Pavement Reconstruction, 20080S1504B2454 - 60 -
1 Rehabilitation, SR 11, Segment 380 to 2 Segment 431, Berwick Borough 30,000 3 (Design and Contingencies - $30,000) 4 (2) SR 42, Concrete and Pavement 5 Reconstruction, Rehabilitation, SR 42 6 from I-80 Interchange to Mall, 7 Including Ramps, Hemlock Township 1,098,000 8 (Base Project Allocation - $1,058,000) 9 (Design and Contingencies - $40,000) 10 (3) I-80, Interstate Restoration and 11 Reconstruction 18,800,000 12 (Base Project Allocation - $18,800,000) 13 (4) SR 1019, Resurfacing, Restoration 415,000 14 (Base Project Allocation - $405,000) 15 (Land Allocation - $10,000) 16 (5) SR 4009, Resurfacing, Restoration 880,000 17 (Base Project Allocation - $870,000) 18 (Land Allocation - $10,000) 19 (6) SR 42, Resurfacing, Restoration 1,810,000 20 (Base Project Allocation - $1,800,000) 21 (Land Allocation - $10,000) 22 (7) SR 42, Resurfacing, Restoration 2,270,000 23 (Base Project Allocation - $2,260,000) 24 (Land Allocation - $10,000) 25 (8) SR 42, Resurfacing, Restoration 1,710,000 26 (Base Project Allocation - $1,700,000) 27 (Land Allocation - $10,000) 28 (9) SR 487, Resurfacing, Restoration 960,000 29 (Base Project Allocation - $950,000) 30 (Land Allocation - $10,000) 20080S1504B2454 - 61 -
1 (10) SR 487, Resurfacing, Restoration 910,000 2 (Base Project Allocation - $900,000) 3 (Land Allocation - $10,000) 4 Section 320. Crawford County. 5 Projects are as follows: 6 (1) I-79, Interstate Restoration and 7 Reconstruction 27,140,000 8 (Base Project Allocation - $27,140,000) 9 (2) PA 27, Corridor Safety Improvement, 10 Flatten Relocate Curve 165,000 11 (Base Project Allocation - $76,000) 12 (Land Allocation - $11,000) 13 (Design and Contingencies - $78,000) 14 (3) SR 198, Relocation and Realignment, 15 Improve Turning Radii, Surface 16 Improvements and Drainage 480,000 17 (Base Project Allocation - $400,000) 18 (Land Allocation - $52,000) 19 (Design and Contingencies - $28,000) 20 (4) SR 6, Concrete Pavement Restoration 21 and Overlay 1,533,000 22 (Base Project Allocation - $1,533,000) 23 Section 321. Cumberland County. 24 Projects are as follows: 25 (1) I-81, Interstate Restoration and 26 Reconstruction 38,200,000 27 (Base Project Allocation - $38,200,000) 28 (2) I-83, Interstate Restoration and 29 Reconstruction 1,700,000 30 (Base Project Allocation - $1,700,000) 20080S1504B2454 - 62 -
1 (3) SR 465, Interchange Improvement 10,411,000 2 (Base Project Allocation - $10,411,000) 3 Section 322. Dauphin County. 4 Projects are as follows: 5 (1) SR 83, Widen, Add Lane, Interchange 6 Improvement, Reconstruct, I-83, East 7 Shore, Section 1 from Eisenhower 8 Interchange to I-81, Lower Paxton, 9 Susquehanna and Swatara Townships 2,062,000 10 (Land Allocation - $1,262,000) 11 (Design and Contingencies - $800,000) 12 (2) I-283, Interstate Restoration and 13 Reconstruction 2,500,000 14 (Base Project Allocation - $2,500,000) 15 (3) I-81, Interstate Restoration and 16 Reconstruction 16,000,000 17 (Base Project Allocation - $16,000,000) 18 (4) I-83, Interstate Restoration and 19 Reconstruction 8,400,000 20 (Base Project Allocation - $8,400,000) 21 (5) SR 422, Intersection Improvements, 22 Widen, Add Turning Lanes and Traffic 23 Signals 6,193,000 24 (Base Project Allocation - $3,836,000) 25 (Design and Contingencies - $2,357,000) 26 (6) SR 39, SR 422, SR 2005, EXTEND ON-RAMP <-- 27 FROM SR 39 ONTO SR 422 TO SR 2005 2,500,000 28 (BASE PROJECT ALLOCATION - $2,500,000) 29 (7) SR 2003, SR 2034, ADD RIGHT TURN LANE 30 ON SR 2003 (MIDDLETOWN-HUMMELSTOWN ROAD 20080S1504B2454 - 63 -
1 AT INTERSECTION WITH SR 2034) FROM 2 MIDDLETOWN TO HUMMELSTOWN 3,100,000 3 (BASE PROJECT ALLOCATION - $3,100,000) 4 (8) SR 3002, EXTEND CURRENT RIGHT TURN 5 LANE IN FRONT OF LOTTERY BUILDING TO 6 LOWER SWATARA FIRE DEPARTMENT BUILDING, 7 REMOVE CURB EXTENSION AND RELOCATE 8 STORM DRAIN IN FRONT OF LOTTERY 9 BUILDING TO ORIGINAL POSITION 1,200,000 10 (BASE PROJECT ALLOCATION - $1,200,000) 11 (9) SR 283, ADD DECELERATION/ACCELERATION 12 LANES ON SR 283 FOR EMERGENCY CROSSOVER 13 AND PAVE CROSSOVER TO MEET FEDERAL 14 STANDARDS 2,300,000 15 (BASE PROJECT ALLOCATION - $2,300,000) 16 (10) SR 2019, SR 3012, WIDEN SR 2019 17 (MILROY ROAD) AND REPLACE UNDERPASS 18 BETWEEN SR 3012 (DERRY STREET) AND 19 GRAYSON ROAD 12,500,000 20 (BASE PROJECT ALLOCATION - $12,500,000) 21 Section 323. Delaware County. 22 Projects are as follows: 23 (1) SR 2028, Channelization and Vertical 24 Clear Improvements, Corridor Safety 25 Improvement, New Traffic Signal, 26 Chestnut Street and Morton Avenue, 10th 27 to 12th Streets, City of Chester 1,300,000 28 (Base Project Allocation - $1,000,000) 29 (Land Allocation - $60,000) 30 (Design and Contingencies - $240,000) 20080S1504B2454 - 64 -
1 (2) SR 3018, New Roadway, Bridgewater Road 2 Extension, Brookhaven Borough and Aston 3 Township 2,040,000 4 (Base Project Allocation - $1,800,000) 5 (Land Allocation - $240,000) 6 (3) I-476, Interstate Restoration and 7 Reconstruction 14,000,000 8 (Base Project Allocation - $14,000,000) 9 (4) I-95, Interstate Restoration and 10 Reconstruction 11,000,000 11 (Base Project Allocation - $11,000,000) 12 Section 324. Elk County. 13 Projects are as follows: 14 (1) SR 255, Highway Restoration, Drainage, 15 Guide Rail and Concrete Pavement 16 Reconstruction, Rehabilitation, SR 255, 17 Million Dollar Highway, Segment 0230 to 18 Segment 0280, City of St. Marys 4,915,000 19 (Base Project Allocation - $4,785,000) 20 (Land Allocation - $50,000) 21 (Design and Contingencies - $80,000) 22 (2) SR 255, Update Signals, Safety 23 Improvement, Vine and Arch Street 24 Signals, City of St. Marys 175,000 25 (Base Project Allocation - $100,000) 26 (Land Allocation - $25,000) 27 (Design and Contingencies - $50,000) 28 Section 325. Erie County. 29 Projects are as follows: 30 (1) SR 19, Intersection Improvements, 20080S1504B2454 - 65 -
1 Waterford at SR 19 and SR 97, Waterford 2 Borough and Waterford Township 335,000 3 (Base Project Allocation - $200,000) 4 (Land Allocation - $60,000) 5 (Design and Contingencies - $75,000) 6 (2) SR 8, Safety Improvement Study, SR 8, 7 Parade Street at 28th Street 8 Intersection, City of Erie 200,000 9 (Base Project Allocation - $100,00) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $80,000) 12 (3) Various Routes, Construction and 13 Coordination of an ITS Command Center, 14 Erie ITS Initiative, Various 15 Municipalities 300,000 16 (Base Project Allocation - $200,00) 17 (Design and Contingencies - $100,000) 18 (4) I-79, Interstate Restoration and 19 Reconstruction 19,000,000 20 (Base Project Allocation - $19,000,000) 21 (5) I-86, Interstate Restoration and 22 Reconstruction 6,500,000 23 (Base Project Allocation - $6,500,000) 24 (6) I-90, Interstate Restoration and 25 Reconstruction 46,000,000 26 (Base Project Allocation - $46,000,000) 27 Section 326. Fayette County. 28 Projects are as follows: 29 (1) SR 119, Highway Restoration, SR 119 30 from Everson to West County Line, 20080S1504B2454 - 66 -
1 Bullskin and Upper Tyrone Townships 5,100,000 2 (Base Project Allocation - $5,100,000) 3 (2) SR 166, Existing Signal Improvement, 4 SR 166 at New Salem Road, Luzerne 5 Township 290,000 6 (Base Project Allocation - $150,000) 7 (Land Allocation - $40,000) 8 (Design and Contingencies - $100,000) 9 (3) SR 21, Highway Restoration, SR 21 from 10 Footdale Road to Duck Hollow Road, 11 German, Menallen and South Union 12 Townships 3,000,000 13 (Base Project Allocation - $3,000,000) 14 (4) SR 40, Highway Restoration, SR 40 from 15 Farmington to Dinnerbell Road, Wharton 16 Township 3,200,000 17 (Base Project Allocation - $3,200,000) 18 (5) SR 51, Highway Restoration, SR 51 from 19 SR 4046 to Westmoreland County Line, 20 Perryopolis Borough and Perry Township 5,200,000 21 (Base Project Allocation - $5,200,000) 22 (6) SR 88, Highway Reconstruction, Main 23 Street, Point Marion, Point Marion 24 Borough 458,000 25 (Base Project Allocation - $200,000) 26 (Land Allocation - $58,000) 27 (Design and Contingencies - $200,000) 28 (7) SR 119, Existing Signal Improvement 537,000 29 (Base Project Allocation - $433,000) 30 (Design and Contingencies - $104,000) 20080S1504B2454 - 67 -
1 (8) SR 21, Intersection Improvement, Add 2 Turning Lanes 206,000 3 (Base Project Allocation - $109,000) 4 (Land Allocation - $42,000) 5 (Design and Contingencies - $55,000) 6 (9) SR 40, Intersection Improvement 284,000 7 (Base Project Allocation - $226,000) 8 (Land Allocation - $26,000) 9 (Design and Contingencies - $32,000) 10 (10) SR 711, Truck Traffic Study, 11 Restoration or New Truck Pull-offs and 12 Escape Ramp, Possible Relocations Truck 13 Traffic 2,926,000 14 (Base Project Allocation - $2,250,000) 15 (Land Allocation - $416,000) 16 (Design and Contingencies - $260,000) 17 Section 327. Forest County. 18 Projects are as follows: 19 (1) SR 66, Highway Restoration 611,000 20 (Base Project Allocation - $611,000) 21 Section 328. Franklin County. 22 Projects are as follows: 23 (1) SR 11, Intersection Improvements, 24 Widening, Turning Lanes, Signal Updates 25 and Resurfacing, Antrim Way 26 Intersection, US 11 and PA 16, 27 Greencastle Borough and Antrim 28 Township 1,725,000 29 (Base Project Allocation - $1,725,000) 30 (2) Route 11, Intersection Improvement of 20080S1504B2454 - 68 -
1 Route 11 and Route 997, Greene 2 Township 1,200,000 3 (3) I-81, Interstate Restoration and 4 Reconstruction 25,000,000 5 (Base Project Allocation - $25,000,000) 6 Section 329. Fulton County. 7 Projects are as follows: 8 (1) SR 16, Intersection and Turn Lane 9 Improvement, PA 6 and JLG Drive, Ayr 10 Township 170,000 11 (Base Project Allocation - $170,000) 12 (2) SR 522, Intersection and Curve 13 Improvements, Safety Improvement, US 14 522 from Timber Ridge Road, SR 2005, to 15 South of Gem Road, SR 2003, Belfast 16 Township 700,000 17 (Base Project Allocation - $600,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $80,000) 20 (3) SR 70, Culvert Replacement, Drainage 21 Improvement, I-70 over Tributary of 22 Little Tonoloway Creek, Bethel 23 Township 605,000 24 (Base Project Allocation - $500,000) 25 (Design and Contingencies - $105,000) 26 (4) SR 70, Restoration, Rehabilitation, 27 Safety Improvements, I-70 Eastbound, 28 Bedford County, Amaranth, Brush Creek 29 and Union Townships 900,000 30 (Base Project Allocation - $900,000) 20080S1504B2454 - 69 -
1 (5) SR 70, Restoration, Rehabilitation, 2 Safety Improvements, I-70 Amaranth to 3 Maryland Line, Bethel, Brush Creek and 4 Union Townships 1,420,000 5 (Base Project Allocation - $1,420,000) 6 (6) I-70, Interstate Restoration and 7 Reconstruction 19,600,000 8 (Base Project Allocation - $19,600,000) 9 (7) SR 30, Concrete Pavement Restoration 10 and Overlay 3,600,000 11 (Base Project Allocation - $3,600,000) 12 Section 330. Greene County. 13 Projects are as follows: 14 (1) SR 21, Highway Restoration, PA 21 from 15 SR 4017 to PA 18, Center Township 4,700,000 16 (Base Project Allocation - $4,700,000) 17 (2) SR 21, Highway Restoration, SR 21 from 18 Junction Deli to Paisley, Cumberland 19 and Monongahela Townships 3,500,000 20 (Base Project Allocation - $3,500,000) 21 (3) SR 21, Highway Restoration, SR 21 from 22 Paisley to Masontown Bridge, Cumberland 23 and Monongahela Townships 4,800,000 24 (Base Project Allocation - $4,800,000) 25 (4) SR 79, Interstate Reconstruction, I-79 26 No.2 from Milepost 0 to Milepost 14, 27 Franklin and Whiteley Townships 3,255,000 28 (Base Project Allocation - $3,000,000) 29 (Design and Contingencies - $255,000) 30 (5) SR 79, Concrete Pavement 20080S1504B2454 - 70 -
1 Reconstruction, Rehabilitation, I-79 2 No.1 from Milepost 0 to Milepost 14, 3 Franklin, Perry and Whiteley Townships 3,000,000 4 (Base Project Allocation - $2,500,000) 5 (Design and Contingencies - $500,000) 6 (6) SR 79, Resurfacing, Smoother Roads, I- 7 79, Franklin, Washington and Whiteley 8 Townships 12,750,000 9 (Base Project Allocation - $12,750,000) 10 (7) SR 79, Reconstruction of Mainline, I- 11 79, Segment 0174 to Segment 0210 and 12 Segment 0175 to Segment 0211, 13 Washington Township 1,680,000 14 (Base Project Allocation - $1,500,000) 15 (Design and Contingencies - $180,000) 16 (8) SR 79, Interstate Reconstruction, I- 17 79, Segment 0064 to Segment 0114 and 18 Segment 0065 to Segment 0115, in area 19 of Longwall Mining, Franklin and 20 Whiteley Townships 2,800,000 21 (Base Project Allocation - $2,600,000) 22 (Design and Contingencies - $200,000) 23 (9) SR 88, Highway Restoration, SR 88 from 24 Point Marion to Dilliner, Dunkard and 25 Monongahela Townships 4,300,000 26 (Base Project Allocation - $4,300,000) 27 (10) I-79, Interstate Restoration and 28 Reconstruction 21,400,000 29 (Base Project Allocation - $21,400,000) 30 (11) SR 21, Highway Reconstruction 3,000,000 20080S1504B2454 - 71 -
1 (Base Project Allocation - $3,000,000) 2 Section 331. Huntingdon County. 3 Projects are as follows: 4 (1) SR 26, Two-Lane Relocation Bypass, SR 5 26 from PA 305 to near Sawmill Road, T- 6 528, Jackson Township 2,285,000 7 (Base Project Allocation - $1,700,000) 8 (Land Allocation - $94,000) 9 (Design and Contingencies - $491,000) 10 (2) PA 26, Slide and Sink Hole Repair 11 under Roadway, Replace Embankment and 12 Roadway Structure 865,000 13 (Base Project Allocation - $865,000) 14 (3) SR 3001, Restoration, Widen and 15 Overlay 6,210,000 16 (Base Project Allocation - $5,200,000) 17 (Land Allocation - $600,000) 18 (Design and Contingencies - $410,000) 19 (4) SR 453, Restoration, Rehabilitation 20 and Truck Climbing Lane 8,003,000 21 (Base Project Allocation - $8,003,000) 22 (5) SR 655, Reconstruction, Utility 23 Relocation and Drainage Improvement 600,000 24 (Base Project Allocation - $600,000) 25 Section 332. Indiana County. 26 Projects are as follows: 27 (1) SR 119, Sign Structure, Bridge 28 Expansion, Dam Replacement, White 29 Township 6,000 30 (Base Project Allocation - $5,000) 20080S1504B2454 - 72 -
1 (Design and Contingencies - $1,000) 2 (2) SR 217, Intersection and Safety 3 Improvements, PA 217 and SR 3009, 4 Newport Road Intersection, Burrell 5 Township 72,000 6 (Base Project Allocation - $60,000) 7 (Land Allocation - $12,000) 8 (3) SR 22, Highway Restoration and 9 Resurfacing, Armagh Bypass East, SR 22 10 from PA 56 to PA 403, East Wheatfield 11 Township 640,000 12 (Base Project Allocation - $600,000) 13 (Design and Contingencies - $40,000) 14 (4) SR 22, Highway Restoration and 15 Resurfacing, Armagh Bypass West, T-893, 16 McClain Hill Road, to PA 56 17 Interchange, East Wheatfield Township 640,000 18 (Base Project Allocation - $600,000) 19 (Design and Contingencies - $40,000) 20 (5) SR 3011, Reestablish Railroad 21 Crossing, Blacklick Railroad Crossing, 22 near Intersection of SR 3011 and US 23 119, Burrell Township 120,000 24 (Base Project Allocation - $120,000) 25 (6) SR 422, Preventive Maintenance, 26 Resurface, US 422 from US 119 East to 27 PA 954, Cherryhill and White Townships 168,000 28 (Base Project Allocation - $168,000) 29 (7) SR 3013, Corridor Safety Improvement, 30 Intersection Reconstruction 94,000 20080S1504B2454 - 73 -
1 (Base Project Allocation - $94,000) 2 (8) SR 119, Pavement Reconstruction and 3 Rehabilitation 1,200,000 4 (Base Project Allocation - $1,200,000) 5 (9) SR 422, Pavement Reconstruction and 6 Rehabilitation 840,000 7 (Base Project Allocation - $840,000) 8 (10) SR 422, Pavement Reconstruction and 9 Rehabilitation 1,000,000 10 (Base Project Allocation - $1,000,000) 11 (11) SR 422, Pavement Reconstruction and 12 Rehabilitation 480,000 13 (Base Project Allocation - $480,000) 14 Section 333. Jefferson County. 15 Projects are as follows: 16 (1) SR 28, Highway Restoration, SR 28 from 17 SR 28/36/322 Intersection to 1.5 Miles 18 South of Intersection, Brookville 19 Borough and Rose Township 510,000 20 (Base Project Allocation - $450,000) 21 (Land Allocation - $40,000) 22 (Design and Contingencies - $20,000) 23 (2) SR 80, Interstate Restoration, 24 Rehabilitation, I-80, Segment 775 to 25 Segment 841 and Segment 774 to Segment 26 840, Brookville Borough, Pine Creek and 27 Rose Townships 2,770,000 28 (Base Project Allocation - $2,700,000) 29 (Design and Contingencies - $70,000) 30 (3) SR 80, Interstate Restoration, 20080S1504B2454 - 74 -
1 Rehabilitation, West I-80, Segment 841 2 to Segment 881 and Segment 840 to 3 Segment 880, Rose and Union Townships 320,000 4 (Base Project Allocation - $300,000) 5 (Design and Contingencies - $20,000) 6 (4) I-80, Interstate Restoration and 7 Reconstruction 23,600,000 8 (Base Project Allocation - $23,600,000) 9 (5) SR 219, Pavement Reconstruction and 10 Rehabilitation 140,000 11 (Base Project Allocation - $140,000) 12 (6) US 119, Flatten the Existing Sharp 13 Horizontal Curve, Add Left-turn Standby 14 Lanes and Improve Intersection Sight 15 Distance 458,000 16 (Base Project Allocation - $146,000) 17 (Design and Contingencies - $312,000) 18 (7) Various, Safety, Congestion Relief, 19 Add Turning Lane, Existing Signal 20 Improvement 325,000 21 (Land Allocation - $325,000) 22 Section 334. Juniata County. 23 Projects are as follows: 24 (1) SR 1007, Reconstruction, SR 1007 from 25 Irving Street to Union Boulevard and 26 Airport Road to Lloyd Street, Tuscarora 27 Township 110,000 28 (Base Project Allocation - $75,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $25,000) 20080S1504B2454 - 75 -
1 (2) SR 3002, Center Turn Lane, Safety 2 Improvement, Intersection of SR 3002 3 and SR 3005, Fermanagh and Walker 4 Townships 180,000 5 (Base Project Allocation - $120,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $50,000) 8 (3) SR 35, SR 4005, Removal of a House at 9 the Intersection, Safety Improvement, 10 SR 35 and Black Log Road, SR 4005, 11 Tuscarora Township 22,000 12 (Base Project Allocation - $5,000) 13 (Land Allocation - $15,000) 14 (Design and Contingencies - $2,000) 15 Section 335. Lackawanna County. 16 Projects are as follows: 17 (1) SR 1012, Intersection Improvement, 18 Kennedy Drive and County Road 19 Intersection, Archbald Borough 120,000 20 (Base Project Allocation - $120,000) 21 (2) SR 81, Restoration, I-81 Northbound 22 and Southbound Concrete Grinding, 23 Dunmore Borough, City of Scranton 270,000 24 (Base Project Allocation - $190,000) 25 (Design and Contingencies - $80,000) 26 (3) SR 81, SR 84, ITS Improvements and 27 Purchases, I-81 Corridor, I-84 28 Corridor, I-380 Corridor, US 6 29 Corridor, Various Municipalities 700,000 30 (Base Project Allocation - $600,000) 20080S1504B2454 - 76 -
1 (Design and Contingencies - $100,000) 2 (4) I-380, Interstate Restoration and 3 Reconstruction 10,400,000 4 (Base Project Allocation - $10,400,000) 5 (5) I-81, Interstate Restoration and 6 Reconstruction 26,400,000 7 (Base Project Allocation - $26,400,000) 8 (6) I-84, Interstate Restoration and 9 Reconstruction 12,100,000 10 (Base Project Allocation - $12,100,000) 11 (7) SR 435, Safety and Intersection 12 Improvements 271,000 13 (Base Project Allocation - $271,000) 14 (8) SR 11, New Traffic Signal 86,000 15 (Land Allocation - $65,000) 16 (Design and Contingencies - $21,000) 17 (9) SR 502, Roadway and Slope Repairs 400,000 18 (Base Project Allocation - $336,000) 19 (Land Allocation - $44,000) 20 (Design and Contingencies - $20,000) 21 (10) SR 84, Pipe Replacement 107,000 22 (Base Project Allocation - $100,000) 23 (Land Allocation - $7,000) 24 Section 336. Lancaster County. 25 Projects are as follows: 26 (1) SR 222, Pave Shoulders, Base Repair, 27 Pavement Reconstruction, 28 Rehabilitation, US 222 from North of US 29 322 to County Line, Brecknock, East 30 Cocalico and Ephrata Townships 2,395,000 20080S1504B2454 - 77 -
1 (Base Project Allocation - $2,280,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $65,000) 4 (2) SR 222, Structural Overlay, Resurface, 5 Shoulder Improvement, US 222 from North 6 of Bushong Road to US 322, Ephrata, 7 Manheim, Warwick and West Earl 8 Townships 3,515,000 9 (Base Project Allocation - $3,400,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $65,000) 12 (3) SR 222, Shoulders, Intersection, Base 13 Repair, Drainage, Structure Overlay, 14 Beaver Valley Pike, US 222 from 15 Quarryville to Willow Street, 16 Quarryville Borough, Providence, 17 Strasburg and West Lampeter Townships 1,640,000 18 (Base Project Allocation - $1,500,000) 19 (Land Allocation - $100,000) 20 (Design and Contingencies - $40,000) 21 (4) SR 30, Concrete Pavement 22 Reconstruction, Rehabilitation, US 30 23 from PA 283 to East of US 222, East 24 Lampeter and Manheim Townships, City of 25 Lancaster 4,048,000 26 (Base Project Allocation - $3,978,000) 27 (Land Allocation - $20,000) 28 (Design and Contingencies - $50,000) 29 (5) SR 30, Add Turning Lane, Corridor 30 Safety, Single and Intersection 20080S1504B2454 - 78 -
1 Improvements, Lincoln Highway Corridor 2 from PA 41 to PA 772, Salisbury 3 Township 1,170,000 4 (Base Project Allocation - $750,000) 5 (Land Allocation - $200,000) 6 (Design and Contingencies - $220,000) 7 (6) SR 23, Transportation Study 578,000 8 (Land Allocation - $578,000) 9 Section 337. Lawrence County. 10 Projects are as follows: 11 (1) SR 1012, Concrete Rehabilitation, 12 Reconstruct and Bituminous Overlay, 13 Frew Mill Road from Bridge over Big Run 14 to Young Road, Shenango and Slippery 15 Rock Townships 2,700,000 16 (Base Project Allocation - $2,700,000) 17 (2) SR 108, Concrete Pavement 18 Reconstruction, Rehabilitation, 19 Harlansburg Road from SR 388 to Brown 20 Road, Hickory and Scott Townships 1,391,000 21 (Base Project Allocation - $1,264,000) 22 (Design and Contingencies - $127,000) 23 (3) SR 108, Concrete Rehabilitation, 24 Reconstruct and Bituminous Overlay, 25 Harlansburg Road from Cascade Street to 26 SR 388, Hickory Township, City of New 27 Castle 923,000 28 (Base Project Allocation - $923,000) 29 (4) SR 168, Concrete Rehabilitation, 30 Reconstruct and Bituminous Overlay, 20080S1504B2454 - 79 -
1 Eastbrook Road from SR 18 to Industrial 2 Boulevard, North Beaver and Taylor 3 Townships 3,000,000 4 (Base Project Allocation - $3,000,000) 5 (5) SR 168, Concrete Rehabilitation, 6 Reconstruct and Bituminous Overlay, 7 Third Street from Industrial Boulevard 8 to Cherry Street, Taylor Township 2,001,000 9 (Base Project Allocation - $2,001,000) 10 (6) SR 18, Upgrade and Coordinate 9 11 Signals, Safety Improvement, SR 18 in 12 New Castle Business District from Grant 13 Avenue to Mahoning Avenue and Moravia 14 Street, City of New Castle 25,000 15 (Design and Contingencies - $25,000) 16 (7) SR 19, Resurfacing Restoration, Perry 17 Highway from SR 108 to SR 1015, Scott 18 and Washington Townships 2,700,000 19 (Base Project Allocation - $2,700,000) 20 (8) SR 19, Concrete Pavement 21 Reconstruction, Rehabilitation, Perry 22 Highway from SR 1018 to Mercer County 23 Line, Washington Township 1,173,000 24 (Base Project Allocation - $1,066,000) 25 (Design and Contingencies - $107,000) 26 (9) SR 2032, Concrete Pavement 27 Reconstruction, Rehabilitation, Cherry 28 Street from SR 18 to SR 168, City of 29 New Castle 1,100,000 30 (Base Project Allocation - $1,000,000) 20080S1504B2454 - 80 -
1 (Design and Contingencies - $100,000) 2 (10) SR 351, Safety Improvement, SR 351 3 from Ellwood City, 5th Street to 9th 4 Street, Ellwood City Borough 233,000 5 (Base Project Allocation - $220,000) 6 (Design and Contingencies - $13,000) 7 (11) SR 4002, Concrete Pavement 8 Reconstruction, Rehabilitation, Sampson 9 Street from Intersection SR 422 and SR 10 60 to beginning of Asphalt Overlay, 11 Union Township 330,000 12 (Base Project Allocation - $300,000) 13 (Design and Contingencies - $30,000) 14 (12) SR 4005, Concrete Rehabilitation, 15 Reconstruct and Bituminous Overlay, 16 River Road from Chapin Road to Nashua 17 Road, Neshannock and Pulaski Townships 650,000 18 (Base Project Allocation - $650,000) 19 (13) SR 422, Concrete Pavement 20 Reconstruction, Rehabilitation, Ben 21 Franklin Highway from Pine Glen Road to 22 Zoccoli Road, Mahoning and Pulaski 23 Townships 4,357,000 24 (Base Project Allocation - $3,961,000) 25 (Design and Contingencies - $396,000) 26 (14) SR 422, Concrete Rehabilitation, 27 Reconstruct and Bituminous Overlay, Ben 28 Franklin Highway from Zoccoli Road to 29 Matthews Road, Mahoning and Union 30 Townships 1,700,000 20080S1504B2454 - 81 -
1 (Base Project Allocation - $1,700,000) 2 (15) SR 422, Realignment and Roadway 3 Reconstruction, Freedom Road Upgrade, 4 Phase A, New Sewickley Township 16,000 5 (Base Project Allocation - $15,000) 6 (Design and Contingencies - $1,000) 7 (16) SR 422, Concrete Pavement 8 Reconstruction, Rehabilitation, Ben 9 Franklin Highway from Shenango Township 10 Line to Copper Road, Shenango, Slippery 11 Rock and Union Townships 3,300,000 12 (Base Project Allocation - $3,300,000) 13 (17) SR 422, Concrete Pavement 14 Reconstruction, Rehabilitation, Ben 15 Franklin Highway from Stoner Drive to 16 Bridge over Slippery Rock, Slippery 17 Rock Township 1,980,000 18 (Base Project Allocation - $1,800,000) 19 (Design and Contingencies - $180,000) 20 (18) SR 422, Concrete Pavement 21 Reconstruction, Rehabilitation, Ben 22 Franklin Highway, Northbound from 23 Bridge over Slippery Rock Bridge to 24 Butler City Line, Slippery Rock 25 Township 1,100,000 26 (Base Project Allocation - $1,000,000) 27 (Design and Contingencies - $100,000) 28 (19) SR 422, Concrete Pavement 29 Reconstruction, Rehabilitation, Ben 30 Franklin Highway, Southbound from 20080S1504B2454 - 82 -
1 Bridge over Slippery Rock Bridge to 2 Butler City Line, Slippery Rock 3 Township 1,100,000 4 (Base Project Allocation - $1,000,000) 5 (Design and Contingencies - $100,000) 6 (20) SR 422, Concrete Pavement 7 Reconstruction, Rehabilitation, Ben 8 Franklin Highway from Copper Road to 9 Stoner Drive, Slippery Rock Township 4,071,000 10 (Base Project Allocation - $3,701,000) 11 (Design and Contingencies - $370,000) 12 (21) SR 422, Concrete Rehabilitation, 13 Reconstruction, SR 422 from SR 60 to 14 Turnpike, Union Township 1,202,000 15 (Base Project Allocation - $1,095,000) 16 (Design and Contingencies - $107,000) 17 (22) SR 422, SR 2004, Concrete Pavement 18 Reconstruction, Rehabilitation, 19 Business Route 422 and SR 422 from 20 Cascade Street to Butler County Line, 21 Shenango, Slippery Rock and Union 22 Townships, City of New Castle 3,965,000 23 (Base Project Allocation - $3,965,000) 24 (23) SR 60, Interstate Maintenance, 25 Concrete Rehabilitation, 26 Reconstruction, SR 60 from Mercer 27 County Line to Mitchell Road, 28 Neshannock, Pulaski and Wilmington 29 Townships 1,626,000 30 (Base Project Allocation - $1,470,000) 20080S1504B2454 - 83 -
1 (Design and Contingencies - $156,000) 2 (24) SR 60, Interstate Maintenance, 3 Concrete Rehabilitation, 4 Reconstruction, SR 60 from Mitchell 5 Road to SR 422, Neshannock and Union 6 Townships 1,750,000 7 (Base Project Allocation - $1,656,000) 8 (Design and Contingencies - $94,000) 9 (25) SR 79, Interstate Maintenance, 10 Restoration and Rehabilitation I-79 11 Corridor, Plain Grove Township 1,575,000 12 (Base Project Allocation - $1,500,000) 13 (Design and Contingencies - $75,000) 14 (26) I-79, Interstate Restoration and 15 Reconstruction 5,100,000 16 (Base Project Allocation - $5,100,000) 17 (27) Various, Slides Correction, Retaining 18 Walls 60,000 19 (Land Allocation - $60,000) 20 (28) Various, Existing Signal Improvement 20,000 21 (Land Allocation - $20,000) 22 (29) SR 501, CONSTRUCTION OF CENTER LEFT <-- 23 TURN LANE AND NEWPORT ROAD 24 CONSTRUCTION 1,736,000 25 (BASE PROJECT ALLOCATION - $1,550,000) 26 (DESIGN AND CONTINGENCIES - $186,000) 27 Section 338. Lebanon County. 28 Projects are as follows: 29 (1) SR 422, Congested Corridor Improvement 30 Program, Add Turning Lane, Signal 20080S1504B2454 - 84 -
1 Improvement, Pedestrian Facilities, SR 2 422 Corridor, Palmyra Borough to Cleona 3 Borough, Various Municipalities 620,000 4 (Base Project Allocation - $500,000) 5 (Land Allocation - $20,000) 6 (Design and Contingencies - $100,000) 7 (2) I-78, Interstate Restoration and 8 Reconstruction 8,000,000 9 (Base Project Allocation - $8,000,000) 10 (3) I-81, Interstate Restoration and 11 Reconstruction 15,100,000 12 (Base Project Allocation - $15,100,000) 13 (4) SR 443, Base and Pavement Restoration 14 and Rehabilitation, Preventive 15 Maintenance on Substructure of Three 16 Bridges 3,025,000 17 (Base Project Allocation - $2,720,000) 18 (Land Allocation - $275,000) 19 (Design and Contingencies - $30,000) 20 Section 339. Lehigh County. 21 Projects are as follows: 22 (1) SR 1004, Foot Drainage Study, Lehigh 23 Avenue Retaining Wall, Whitehall 24 Township 450,000 25 (Base Project Allocation - $100,000) 26 (Land Allocation - $100,000) 27 (Design and Contingencies - $250,000) 28 (2) SR 145, Excavate Rock, Shoulder, 29 Correct Drainage, Safety Improvement, 30 SR 145, Segment 260 and Segment 270, 20080S1504B2454 - 85 -
1 North Whitehall Township 400,000 2 (Base Project Allocation - $100,000) 3 (Land Allocation - $50,000) 4 (Design and Contingencies - $250,000) 5 (3) SR 222, Signalization, Safety 6 Improvement, SR 222 and Shantz Road 7 Intersection, Upper Macungie Township 340,000 8 (Base Project Allocation - $100,000) 9 (Land Allocation - $40,000) 10 (Design and Contingencies - $200,000) 11 (4) SR 29, Congested Corridor Improvement 12 Program, Corridor Safety Improvement, 13 Cedar Crest Boulevard Corridor from I- 14 78 to Chestnut Street, Various 15 Municipalities 475,000 16 (Base Project Allocation - $300,000) 17 (Land Allocation - $75,000) 18 (Design and Contingencies - $100,000) 19 (5) SR 4003, Replace Headwalls, Concrete 20 Gutter Regrading and Set Back, Safety 21 Improvement, Kernsville Road at Jordan 22 Road, North Whitehall Township 310,000 23 (Base Project Allocation - $100,000) 24 (Land Allocation - $40,000) 25 (Design and Contingencies - $170,000) 26 (6) SR 78, Provide Roaming Service Patrol, 27 Safety Improvement, SR 78 from SR 100 28 to SR 309/145 and along SR 22 from I-78 29 to SR 33, Various Municipalities 180,000 30 (Base Project Allocation - $180,000) 20080S1504B2454 - 86 -
1 (7) SR 22, Install Dynamic Message Signs, 2 I-78 and SR 22 Corridors, Various 3 Municipalities 390,000 4 (Base Project Allocation - $95,000) 5 (Land Allocation - $15,000) 6 (Design and Contingencies - $280,000) 7 (8) SR 22, Installation of Highway 8 Advisory Radio Beacons, I-78 and SR 22 9 Corridors, Various Municipalities 300,000 10 (Base Project Allocation - $100,000) 11 (Land Allocation - $15,000) 12 (Design and Contingencies - $185,000) 13 (9) SR 22, Replace 27 Existing Queue 14 Detectors with Passive Acoustic 15 Sensors, SR 22, I-78 and SR 33 16 Corridors, Various Municipalities 617,000 17 (Base Project Allocation - $100,000) 18 (Design and Contingencies - $517,000) 19 (10) SR 78, Replacement of Precast 20 Parapets, Various Locations on SR 78, 21 SR 22, SR 863, SR 873 and SR 3007, 22 Various Municipalities 2,690,000 23 (Base Project Allocation - $150,000) 24 (Land Allocation - $40,000) 25 (Design and Contingencies - $2,500,000) 26 (11) SR 78, Install Median Guide Rail, 27 Safety Improvement, I-78 Various 28 Locations, Various Municipalities 725,000 29 (Base Project Allocation - $100,000) 30 (Design and Contingencies - $625,000) 20080S1504B2454 - 87 -
1 (12) SR 78, Install Closed Circuit 2 Television Cameras, I-78 and SR 33 3 Corridors, Various Municipalities 265,000 4 (Base Project Allocation - $125,000) 5 (Land Allocation - $15,000) 6 (Design and Contingencies - $125,000) 7 (13) I-78, Interstate Restoration and 8 Reconstruction 19,220,000 9 (Base Project Allocation - $19,220,000) 10 (14) SR 309, Widen to Incorporate Left 11 Turn Lanes at Signalized Intersections, 12 Median Barrier, Crosswalks and Sidewalk 13 Improvements 336,000 14 (Base Project Allocation - $336,000) 15 Section 340. Luzerne County. 16 Projects are as follows: 17 (1) SR 11, Intersection Improvement, SR 11 18 and SR 29 Intersection, Plymouth 19 Township 29,000 20 (Base Project Allocation - $10,000) 21 (Land Allocation - $4,000) 22 (Design and Contingencies - $15,000) 23 (2) SR 115, Install Rock Fence, Safety 24 Improvement, PA 115 from Truck Escape 25 Ramp to East Mountain Boulevard, Plains 26 Township 675,000 27 (Base Project Allocation - $600,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $25,000) 30 (3) SR 2029, Remove Existing Abandoned 20080S1504B2454 - 88 -
1 Railroad Bridge Abutments, Safety 2 Improvement, Abutment Removal, York 3 Avenue and Wood Street, Duryea Borough 26,000 4 (Base Project Allocation - $18,000) 5 (Land Allocation - $8,000) 6 (4) SR 2032, Remove Existing Abandoned 7 Railroad Bridge Abutments, Safety 8 Improvement, Near the Intersection of 9 SR 2030 and SR 2032, Duryea and 10 Hughestown Boroughs 19,000 11 (Base Project Allocation - $19,000) 12 (5) SR 309, Install Rock Fence, Safety 13 Improvement, PA 309, Brown Street, T- 14 433, to Pine Run Road, SR 2034, 15 Fairview and Hanover Townships 640,000 16 (Base Project Allocation - $640,000) 17 (6) SR 80, SR 81, SR 309, ITS Improvements 18 and Purchases, I-80 Corridor, I-81 19 Corridor and PA 309 Corridor, Various 20 Municipalities 700,000 21 (Base Project Allocation - $600,000) 22 (Design and Contingencies - $100,000) 23 (7) South Valley Parkway connecting PA 24 Route 29 to Kirmar Parkway, Nanticoke, 25 Hanover and Newport Townships 65,000,000 26 (Base Project Allocation - $65,000,000) 27 (8) I-80, Interstate Restoration and 28 Reconstruction 25,300,000 29 (Base Project Allocation - $25,300,000) 30 (9) I-81, Interstate Restoration and 20080S1504B2454 - 89 -
1 Reconstruction 39,100,000 2 (Base Project Allocation - $39,100,000) 3 (10) New Road, New Access Road 3,570,000 4 (Base Project Allocation - $3,570,000) 5 (11) SR 3046, South Valley Parkway, New 6 Two-Lane Roadway, New Interchange with 7 Route 29, Bridge Replacement, SR 2008, 8 Middle Road over Route 29 and Bridge 1,755,000 9 (Land Allocation - $1,404,000) 10 (Design and Contingencies - $351,000) 11 (12) SR 115, Interchange Safety 12 Improvement 2,662,000 13 (Base Project Allocation - $1,622,000) 14 (Land Allocation - $1,040,000) 15 (13) SR 239, Restoration 87,000 16 (Land Allocation - $87,000) 17 (14) SR 6039, Corridor Safety Improvement, 18 Signals and Widening 267,000 19 (Base Project Allocation - $267,000) 20 (15) SR 924, Restoration and Widening Two 21 Lanes to Five Lanes 3,031,000 22 (Base Project Allocation - $3,031,000) 23 (16) SR 924, Restoration and Widening 1,831,000 24 (Base Project Allocation - $1,831,000) 25 (17) SR 93, Restoration and Widening 3,516,000 26 (Base Project Allocation - $3,516,000) 27 (18) SR 2029, Abutment Removal 8,000 28 (Land Allocation - $8,000) 29 (19) SR 2032, Abutment Removal 4,000 30 (Base Project Allocation - $4,000) 20080S1504B2454 - 90 -
1 (20) SR 309, Install Rock Fence 640,000 2 (Base Project Allocation - $640,000) 3 (21) SR 309, Restoration, Roadway and 4 Retaining Wall 430,000 5 (Base Project Allocation - $430,000) 6 Section 341. Lycoming County. 7 Projects are as follows: 8 (1) SR 15, Safety Improvement, Center Turn 9 Lane US 15 from SR 54 to South 10 Williamsport, Armstrong and Clinton 11 Townships 80,000 12 (Base Project Allocation - $60,000) 13 (Design and Contingencies - $20,000) 14 (2) SR 15, Highway Reconstruction, SR 15- 15 A10 Section, Northbound, Segment 1350 16 to Segment 1390, Lycoming and Old 17 Lycoming Townships 680,000 18 (Base Project Allocation - $680,000) 19 (3) SR 15, Resurface, Reconstruct 20 Concrete, SR 15-A10 Section, 21 Southbound, Segment 1301 to Segment 22 1391, Lycoming and Old Lycoming 23 Townships 10,000,000 24 (Base Project Allocation - $10,000,000) 25 (4) SR 15, Restoration, Reconstruct 26 Concrete, SR 15-A10 Section, 27 Northbound, Segment 1300 to Segment 28 1350, Old Lycoming Township 5,835,000 29 (Base Project Allocation - $5,400,000) 30 (Design and Contingencies - $435,000) 20080S1504B2454 - 91 -
1 (5) SR 2014, Reconstruction, Broad Street 2 from Loyalsock Creek to Montour Street, 3 Montoursville Borough 370,000 4 (Base Project Allocation - $350,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $10,000) 7 (6) SR 220, Build Loons, Safety 8 Improvement, SR 0220 from Segment 0200 9 to Segment 0221, Woodward Township 50,000 10 (Base Project Allocation - $50,000) 11 (7) US 15, Reconstruction, US 15, PA 220 12 Ramp, City of Williamsport 420,000 13 (Base Project Allocation - $400,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $10,000) 16 (8) I-180, Interstate Restoration and 17 Reconstruction 19,000,000 18 (Base Project Allocation - $19,000,000) 19 (9) SR 118, Intersection Improvement 520,000 20 (Base Project Allocation - $520,000) 21 (10) SR 15, Highway Restoration 2,270,000 22 (Base Project Allocation - $2,000,000) 23 (Land Allocation - $270,000) 24 (11) SR 15, Highway Restoration 3,670,000 25 (Base Project Allocation - $3,400,000) 26 (Land Allocation - $270,000) 27 (12) SR 15, Highway Restoration 5,835,000 28 (Base Project Allocation - $5,400,000) 29 (Land Allocation - $435,000) 30 (13) SR 2014, Resurfacing and Restoration 660,000 20080S1504B2454 - 92 -
1 (Base Project Allocation - $650,000) 2 (Land Allocation - $10,000) 3 (14) SR 2039, Retaining Wall and 4 Restoration 640,000 5 (Base Project Allocation - $550,000) 6 (Land Allocation - $50,000) 7 (Design and Contingencies - $40,000) 8 (15) SR 2060, Resurfacing and Restoration 63,000 9 (Base Project Allocation - $53,000) 10 (Land Allocation - $10,000) 11 (16) SR 220, Resurfacing and Restoration 535,000 12 (Base Project Allocation - $525,000) 13 (Land Allocation - $10,000) 14 (17) SR 220, Safety Improvement, Widening 15 and Construct Loon 119,000 16 (Base Project Allocation - $50,000) 17 (Land Allocation - $54,000) 18 (Design and Contingencies - $15,000) 19 (18) SR 3027, Resurfacing and Restoration 70,000 20 (Base Project Allocation - $60,000) 21 (Land Allocation - $10,000) 22 (19) SR 3028, Resurfacing and Restoration 367,000 23 (Base Project Allocation - $357,000) 24 (Land Allocation - $10,000) 25 (20) SR 54, Resurfacing and Restoration 100,000 26 (Base Project Allocation - $90,000) 27 (Land Allocation - $10,000) 28 (21) SR 654, Resurfacing and Restoration 980,000 29 (Base Project Allocation - $970,000) 30 (Land Allocation - $10,000) 20080S1504B2454 - 93 -
1 Section 342. McKean County. 2 Projects are as follows: 3 (1) SR 446, Highway Lighting for Safety 4 Improvements, SR 446 Lighting between 5 SR 155 and SR 1002, Eldred Township 35,000 6 (Base Project Allocation - $3,000) 7 (Land Allocation - $17,000) 8 (Design and Contingencies - $15,000) 9 (2) SR 770, Sight Distance Intersection 10 Improvements, Safety Improvements, SR 11 770 and SR 4005 Intersection, Bradford 12 Township 145,000 13 (Base Project Allocation - $100,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $25,000) 16 Section 343. Mercer County. 17 Projects are as follows: 18 (1) SR 208, Turn Lanes, Interchange 19 Improvements, SR 208 at Blacktown Road, 20 SR 2006 and at George Junior Road, SR 21 63, Pine Township 245,000 22 (Base Project Allocation - $200,000) 23 (Land Allocation - $15,000) 24 (Design and Contingencies - $30,000) 25 (2) SR 18, Relocation of East Lake Road 26 from Intersection with SR 18, 27 Pymatuning Township 3,450,000 28 (Base Project Allocation - $2,500,000) 29 (Land Allocation - $150,000) 30 (Design and Contingencies - $800,000) 20080S1504B2454 - 94 -
1 (3) Reconstruction and Subsidence 2 Prevention Construction, East Lake 3 Road, from PA 18 for 0.2 miles, 4 Pymatuning Township 3,550,000 5 (Base Project Allocation - $2,500,000) 6 (Land Allocation - $250,000) 7 (Design and Contingencies - $800,000) 8 (4) I-80, Interstate Restoration and 9 Reconstruction 27,000,000 10 (Base Project Allocation - $27,000,000) 11 (5) I-79, Interstate Restoration and 12 Reconstruction 25,500,000 13 (Base Project Allocation - $25,500,000) 14 (6) SR 60, Phase 2, Restoration, 15 Rehabilitation and Upgrading Existing 16 Signals 2,476,000 17 (Base Project Allocation - $1,200,000) 18 (Design and Contingencies - $1,276,000) 19 (7) SR 60, Safety Improvement, 20 Reconstruction for Turning Lane, 21 Intersection Improvements, Roadway 22 Resurfacing, Update of Traffic Signals 2,819,000 23 (Base Project Allocation - $1,839,000) 24 (Land Allocation - $260,000) 25 (Design and Contingencies - $720,000) 26 (8) EAST LAKE ROAD, RECONSTRUCTION AND <-- 27 SUBSIDENCE PREVENTION, 0.2 MILES, 28 PYMATUNING TOWNSHIP 3,550,000 29 (BASE PROJECT ALLOCATION - $2,500,000) 30 (LAND ALLOCATION - $250,000) 20080S1504B2454 - 95 -
1 (DESIGN AND CONTINGENCIES - $800,000) 2 Section 344. Mifflin County (Reserved). 3 Section 345. Monroe County. 4 Projects are as follows: 5 (1) SR 33, Installation of Median Barrier, 6 SR 33 Median Barrier South Section, 7 Segment 0130 to Segment 0181, Hamilton 8 Township 870,000 9 (Base Project Allocation - $60,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $800,000) 12 (2) SR 33, Installation of Median Barrier, 13 Safety Improvement, SR 33 Median 14 Barrier, South Section, Segment 0010 to 15 Segment 0100, Hamilton and Ross 16 Townships 550,000 17 (Base Project Allocation - $40,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $500,000) 20 (3) SR 80, Replacement of Precast 21 Parapets, Bridges with Hoan-Like 22 Details, Group A, I-80, Segment 2931 23 and Segment 2935, Various 24 Municipalities 1,120,000 25 (Base Project Allocation - $100,000) 26 (Design and Contingencies - $1,020,000) 27 (4) SR 80, Replacement of Precast 28 Parapets, Bridges with Hoan-Like 29 Details, Group B, I-80, Segment 2974, 30 Various Municipalities 2,543,000 20080S1504B2454 - 96 -
1 (Base Project Allocation - $200,000) 2 (Design and Contingencies - $2,343,000) 3 (5) SR 80, Replacement of Precast 4 Parapets, Bridges with Hoan-Like 5 Details, Group C, I-80, Segment 3044 6 and Segment 3050, Various 7 Municipalities 2,134,000 8 (Base Project Allocation - $80,000) 9 (Design and Contingencies - $2,054,000) 10 (6) SR 80, Install Dynamic Message Signs 11 and Closed Circuit Television Cameras, 12 I-80 Corridor, Round 1, Various 13 Municipalities 300,000 14 (Base Project Allocation - $150,000) 15 (Design and Contingencies - $150,000) 16 (7) SR 80, Install Dynamic Message Signs 17 and Closed Circuit Television Cameras, 18 I-80 Corridor, Round 2, Various 19 Municipalities 330,000 20 (Base Project Allocation - $150,000) 21 (Design and Contingencies - $180,000) 22 (8) SR 80, Install Dynamic Message Signs, 23 Closed Circuit Television Cameras, 24 Highway Advisory Radio and Highway 25 Advisory Radio Beacons, I-80 and I-380 26 Corridors, Various Municipalities 345,000 27 (Base Project Allocation - $65,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $270,000) 30 (9) SR 80, Install Dynamic Message Signs 20080S1504B2454 - 97 -
1 and Closed Circuit Television Cameras, 2 I-80 and I-380 Corridors, Round 4, 3 Various Municipalities 320,000 4 (Base Project Allocation - $175,000) 5 (Design and Contingencies - $145,000) 6 (10) SR 80, Install Dynamic Message Signs, 7 I-80 and I-380 Corridors, Round 5, 8 Various Municipalities 300,000 9 (Base Project Allocation - $150,000) 10 (Land Allocation - $45,000) 11 (Design and Contingencies - $105,000) 12 (11) SR 447, Signalization and 13 Construction of Dedicated Turning 14 Lanes, SR 447 and Brushy Mountain Road, 15 Stroud Township 1,500,000 16 (Base Project Allocation - $1,500,000) 17 (12) I-380, Interstate Restoration and 18 Reconstruction 13,100,000 19 (Base Project Allocation - $13,100,000) 20 (13) I-80, Interstate Restoration and 21 Reconstruction 27,300,000 22 (Base Project Allocation - $27,300,000) 23 (14) SR 611, Intersection Improvement, 24 Realignment, Construct a Connector Road 25 to Connect SR 196 to SR 611 476,000 26 (Base Project Allocation - $361,000) 27 (Design and Contingencies - $115,000) 28 (15) SR 33, Median Barrier Installation 763,000 29 (Base Project Allocation - $500,000) 30 (Land Allocation - $243,000) 20080S1504B2454 - 98 -
1 (Design and Contingencies - $20,000) 2 (16) SR 447 AND BRUSHY MOUNTAIN ROAD, <-- 3 SIGNALIZATION AND CONSTRUCTION, TURNING 4 LANES, STROUD TOWNSHIP 1,500,000 5 (BASE PROJECT ALLOCATION - $1,500,000) 6 Section 346. Montgomery County. 7 Projects are as follows: 8 (1) SR 1012, Widening of Approaches to 9 Provide Left and Right Turn Lanes and 10 Intersection Improvements, Lower Road 11 from Allentown Road to Intersections at 12 Cowpath Road and Intersections at SR 13 1012, Godshall Road, Franconia 14 Township 400,000 15 (Base Project Allocation - $400,000) 16 (2) SR 202, Reconstruction and Widening, 17 US 202, Hancock Road to PA 309, No.1, 18 Lower Gwynedd, Montgomery and Upper 19 Gwynedd Townships 6,702,000 20 (Base Project Allocation - $5,900,000) 21 (Land Allocation - $802,000) 22 (3) SR 23, Construct Four-Lane Controlled 23 Access Highway, Approximately 3.5 Miles 24 in Length, SR 23 Between US 422 and 25 Dekalb Pike, US 202, Upper Merion 26 Township 11,100,000 27 (Base Project Allocation - $10,000,000) 28 (Land Allocation - $500,000) 29 (Design and Contingencies - $600,000) 30 (4) SR 3001, Relocation, Realignment, 20080S1504B2454 - 99 -
1 Norristown Road at Stenton Avenue and 2 Narcissa Road, Whitpain Township 200,000 3 (Base Project Allocation - $200,000) 4 (5) SR 3029, Road Widening, I-76 5 Intersection and Henderson Road, Upper 6 Merion Township 2,920,000 7 (Base Project Allocation - $2,000,000) 8 (Land Allocation - $400,000) 9 (Design and Contingencies - $520,000) 10 (6) SR 4028, Realignment and Widening to 11 Soften Curve, SR 4028, Pleasant View 12 Road, Lower Pottsgrove Township 120,000 13 (Base Project Allocation - $120,000) 14 (7) SR 422, Corridor Safety Improvement, 15 US 422 Interim Improvements, Lower 16 Providence, Montgomery, Upper Merion 17 and West Norriton Townships 1,025,000 18 (Base Project Allocation - $1,000,000) 19 (Land Allocation - $25,000) 20 (8) SR 476, ITS Reconstruction and 21 Purchases, I-476 Schuylkill River 22 Bridge Redecking, Companion Project, 23 Conshohocken Borough and Plymouth 24 Township 1,230,000 25 (Base Project Allocation - $1,230,000) 26 (9) SR 476, Highway Reconstruction, I-476 27 from Schuylkill Expressway, I-76, to 28 Pennsylvania Turnpike, I-276, 29 Conshohocken and West Conshohocken 30 Boroughs, Lower Merion and Plymouth 20080S1504B2454 - 100 -
1 Townships 101,500,000 2 (Base Project Allocation - 3 $100,000,000) 4 (Land Allocation - $1,500,000) 5 (10) SR 73, Corridor Safety Improvement, 6 Intersection Improvement, PA 73 from US 7 202 to Butler Pike, Skippack and Upper 8 Merion Townships 560,000 9 (Base Project Allocation - $560,000) 10 (11) SR 9102, Extension, Add Lane, 11 Lafayette Street Corridor, Norristown 12 Borough and Upper Merion Township 9,000,000 13 (Base Project Allocation - $9,000,000) 14 (12) US 202, Add Lane, Widen, Restoration, 15 Rehabilitation, Safety Improvements, US 16 202, Markley Street Improvement, 17 Norristown Borough 3,680,000 18 (Base Project Allocation - $3,400,000) 19 (Land Allocation - $280,000) 20 (13) Existing Signal Improvement, Widen, 21 Markley Street Improvement, Harding 22 Boulevard to Johnson Street, Norristown 23 Borough 3,000,000 24 (Base Project Allocation - $2,800,000) 25 (Land Allocation - $200,000) 26 (14) I-476, Interstate Restoration and 27 Reconstruction 5,300,000 28 (Base Project Allocation - $5,300,000) 29 (15) I-76, Interstate Restoration and 30 Reconstruction 11,900,000 20080S1504B2454 - 101 -
1 (Base Project Allocation - $11,900,000) 2 (16) PA 463, Widen to Four Lanes 995,000 3 (Base Project Allocation - $995,000) 4 (17) SR 2001, Intersection Improvement, 5 Turn Lanes and Signals 400,000 6 (Base Project Allocation - $360,000) 7 (Design and Contingencies - $40,000) 8 (18) SR 2027, Intersection Improvement, 9 Traffic Signal, Align Camp Hill Road 10 with PA Avenue, Left Turn Lanes 1,065,000 11 (Base Project Allocation - $784,000) 12 (Land Allocation - $187,000) 13 (Design and Contingencies - $94,000) 14 (19) SR 2038, Intersection Improvement, 15 Widen for South Bound Right Turn Lane 234,000 16 (Base Project Allocation - $200,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $14,000) 19 (20) US 202, Widen, Intersection Upgrades 20 and Structure Rehabilitation 400,000 21 (Land Allocation - $400,000) 22 Section 347. Montour County. 23 Projects are as follows: 24 (1) I-80, Interstate Restoration and 25 Reconstruction 10,900,000 26 (Base Project Allocation - $10,900,000) 27 (2) SR 11, Resurfacing and Restoration 1,290,000 28 (Base Project Allocation - $1,280,000) 29 (Land Allocation - $10,000) 30 (3) SR 11, Resurfacing and Restoration 1,290,000 20080S1504B2454 - 102 -
1 (Base Project Allocation - $1,280,000) 2 (Land Allocation - $10,000) 3 (4) SR 44, Resurfacing and Restoration 10,000 4 (Land Allocation - $10,000) 5 (5) SR 54, Resurfacing and Restoration 10,000 6 (Land Allocation - $10,000) 7 (6) SR 54, Resurfacing and Restoration 10,000 8 (Land Allocation - $10,000) 9 (7) SR 642, Resurfacing and Restoration 1,510,000 10 (Base Project Allocation - $1,500,000) 11 (Land Allocation - $10,000) 12 Section 348. Northampton County. 13 Projects are as follows: 14 (1) SR 191 and SR 248, Installation of a 15 Closed Loop System, SR 191 and SR 248 16 Intersection, Nazareth Borough 400,000 17 (Base Project Allocation - $55,000) 18 (Land Allocation - $5,000) 19 (Design and Contingencies - $340,000) 20 (2) SR 33, Expansion of Existing Park and 21 Ride Facility, SR 33, Park and Ride 22 Lot, Bethlehem Township 5,000,000 23 (Base Project Allocation - $100,000) 24 (Land Allocation - $200,000) 25 (Design and Contingencies - $4,700,000) 26 (3) SR 378, Ramp Reconfiguration, 412 27 Second Street Ramp, City of Bethlehem 1,740,000 28 (Base Project Allocation - $1,620,000) 29 (Land Allocation - $120,000) 30 (4) SR 611, Corridor Management Plan to 20080S1504B2454 - 103 -
1 Preserve Scenic, Historic and Cultural 2 Qualities, Delaware River Valley Scenic 3 Byway, Lower Mt. Bethel and Williams 4 Townships 700,000 5 (Base Project Allocation - $115,000) 6 (Land Allocation - $85,000) 7 (Design and Contingencies - $500,000) 8 (5) SR 611, Flashing Warning Devices, Rock 9 Excavation, Median Barrier, Retaining 10 Wall, Shoulders, SR 611, Canal Lock 11 Curves, Williams Township 700,000 12 (Base Project Allocation - $150,000) 13 (Land Allocation - $50,000) 14 (Design and Contingencies - $500,000) 15 (6) SR 611, Drainage, Remove Curbs, 16 Shoulders, Guide Rail and Utility Pole, 17 SR 611 Safety Improvement, Williams 18 Township, City of Easton 600,000 19 (Base Project Allocation - $150,000) 20 (Land Allocation - $50,000) 21 (Design and Contingencies - $400,000) 22 (7) SR 33 and SR 1002, Palmer Township 23 Interchange, Palmer Township 23,000,000 24 (Base Project Allocation - $23,000,000) 25 (8) I-78, Interstate Restoration and 26 Reconstruction 11,900,000 27 (Base Project Allocation - $11,900,000) 28 (9) SR 378, Convert Traffic Flow One Way 29 and Two Way 500,000 30 (Base Project Allocation - $500,000) 20080S1504B2454 - 104 -
1 (10) SR 412, Park and Ride Lot, Intermodal 2 Services 167,000 3 (Base Project Allocation - $167,000) 4 (11) SR 378, Relocate and Widen the Ramp 1,740,000 5 (Base Project Allocation - $1,620,000) 6 (Design and Contingencies - $120,000) 7 Section 349. Northumberland County. 8 Projects are as follows: 9 (1) SR 4012, Resurface, Rehabilitation, SR 10 4012 from Zimmerman's Hollow Road to SR 11 487, Snydertown Borough, Ralpho, 12 Shamokin and Upper Augusta Townships 2,500,000 13 (Base Project Allocation - $2,500,000) 14 (2) SR 61, Congested Corridor Improvement 15 Program, Corridor Safety Improvement, 16 SR 61 from SR 890 to SR 147, Upper 17 Augusta Township, City of Sunbury 50,000 18 (Design and Contingencies - $50,000) 19 (3) I-180, Interstate Restoration and 20 Reconstruction 8,900,000 21 (Base Project Allocation - $8,900,000) 22 (4) I-80, Interstate Restoration and 23 Reconstruction 5,000,000 24 (Base Project Allocation - $5,000,000) 25 (5) SR 147, Resurfacing and Restoration 710,000 26 (Base Project Allocation - $700,000) 27 (Land Allocation - $10,000) 28 (6) SR 225, Resurfacing and Restoration 437,000 29 (Base Project Allocation - $432,000) 30 (Land Allocation - $5,000) 20080S1504B2454 - 105 -
1 (7) SR 225, Resurfacing and Restoration 970,000 2 (Base Project Allocation - $960,000) 3 (Land Allocation - $10,000) 4 (8) SR 225, Resurfacing and Restoration 1,110,000 5 (Base Project Allocation - $1,100,000) 6 (Land Allocation - $10,000) 7 (9) SR 4006, Resurfacing and Restoration 1,107,000 8 (Base Project Allocation - $1,097,000) 9 (Land Allocation - $10,000) 10 (10) SR 54, Resurfacing and Restoration 320,000 11 (Base Project Allocation - $310,000) 12 (Land Allocation - $10,000) 13 (11) SR 54, Resurfacing and Restoration 970,000 14 (Base Project Allocation - $960,000) 15 (Land Allocation - $10,000) 16 (12) SR 61, Resurfacing and Restoration 785,000 17 (Base Project Allocation - $775,000) 18 (Land Allocation - $10,000) 19 Section 350. Perry County. 20 Projects are as follows: 21 (1) SR 274, Intersection Improvement, Add 22 Turning Lanes 475,000 23 (Base Project Allocation - $475,000) 24 (2) SR 34, Intersection Improvement 2,420,000 25 (Land Allocation - $920,000) 26 (Design and Contingencies - $1,500,000) 27 Section 351. Philadelphia County. 28 Projects are as follows: 29 (1) Signal Improvements, Congestion 30 Reduction, 34th Street, Mantua Avenue 20080S1504B2454 - 106 -
1 to Spruce Street, City of Philadelphia 220,000 2 (Base Project Allocation - $220,000) 3 (2) SR 676, Highway and Structure 4 Replacement, Reconstruction, Vine 5 Street Expressway, 7 Bridge Project, 6 City of Philadelphia 4,373,000 7 (Base Project Allocation - $460,000) 8 (Land Allocation - $143,000) 9 (Design and Contingencies - $3,770,000) 10 (3) SR 76, Traffic System Management, I-76 11 Regional Travel Information, 12 Conshohocken and West Conshohocken 13 Boroughs, Lower Merion and Upper Merion 14 Townships and City of Philadelphia 667,000 15 (Base Project Allocation - $417,000) 16 (Design and Contingencies - $250,000) 17 (4) SR 95, Surface Street Reconstruction 18 along with Several Ramps, Interchange 19 Improvement and Widening, Cottman- 20 Princeton Local Street Ramp, City of 21 Philadelphia 3,400,000 22 (Base Project Allocation - $2,500,000) 23 (Land Allocation - $900,000) 24 (5) SR 95, Utility Relocation, Water and 25 Sewer, Retaining Walls, Signal 26 Improvements and Surface Streets 27 Reconstruction, I-95 Corridor, 28 Wissinoming Avenue, Bleigh Avenue, 29 Milnor Street, City of Philadelphia 2,000,000 30 (Base Project Allocation - $1,500,000) 20080S1504B2454 - 107 -
1 (Land Allocation - $500,000) 2 (6) I-76, Interstate Restoration and 3 Reconstruction 7,500,000 4 (Base Project Allocation - $7,500,000) 5 (7) I-676, Interstate Restoration and 6 Reconstruction 1,500,000 7 (Base Project Allocation - $1,500,000) 8 (8) I-95, Interstate Restoration and 9 Reconstruction 21,000,000 10 (Base Project Allocation - $21,000,000) 11 Section 352. Pike County. 12 Projects are as follows: 13 (1) SR 2001, Restoration and 14 Reconstruction, Milford to Bushkill 15 No.5, Rockledge Road to SR 739 and 16 including SR 739, Delaware Township 3,400,000 17 (Base Project Allocation - $2,400,000) 18 (Land Allocation - $1,000,000) 19 (2) SR 84, Reconstruction, I-84, Pike 20 County, Blooming Grove and Dingman 21 Townships 4,140,000 22 (Base Project Allocation - $3,600,000) 23 (Design and Contingencies - $540,000) 24 (3) SR 84, ITS Improvements and Purchases, 25 I-84 Corridor, Various Municipalities 480,000 26 (Base Project Allocation - $400,000) 27 (Design and Contingencies - $80,000) 28 (4) I-84, Interstate Restoration and 29 Reconstruction 35,100,000 30 (Base Project Allocation - $35,100,000) 20080S1504B2454 - 108 -
1 (5) SR 739, Safety Improvement, Straighten 2 Curve and Restoration 109,000 3 (Design and Contingencies - $109,000) 4 Section 353. Potter County. 5 Projects are as follows: 6 (1) SR 6, Turn Lanes, Safety Improvement, 7 SR 6 and SR 872, Coudersport Borough 8 and Eulalia Township 300,000 9 (Base Project Allocation - $200,000) 10 (Land Allocation - $25,000) 11 (Design and Contingencies - $75,000) 12 Section 354. Schuylkill County. 13 Projects are as follows: 14 (1) SR 2002, Replacement of Precast 15 Parapets, Group D, SR 2002 Corridor, 16 Port Carbon Borough 320,000 17 (Base Project Allocation - $100,000) 18 (Design and Contingencies - $220,000) 19 (2) SR 61, Interim Traffic Signal, SR 61 20 and SR 895 Intersection, Deer Lake 21 Borough 300,000 22 (Base Project Allocation - $50,000) 23 (Land Allocation - $50,000) 24 (Design and Contingencies - $200,000) 25 (3) SR 61, Upgrade Signalization, SR 61, 26 Tunnel Road, East Norwegian Township 325,000 27 (Base Project Allocation - $50,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $225,000) 30 (4) SR 61, Median Barrier Installation, SR 20080S1504B2454 - 109 -
1 61, Median Barrier, Orwigsburg Borough, 2 North Manheim and West Brunswick 3 Townships 300,000 4 (Base Project Allocation - $50,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $240,000) 7 (5) SR 61, Interim Traffic Signal, SR 61, 8 Brick Hill Road, West Brunswick 9 Township 300,000 10 (Base Project Allocation - $50,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $200,000) 13 (6) SR 61, Pavement Restoration, 14 Rehabilitation, Interstate Improvement, 15 I-81 Lebanon County Line to Pine Grove, 16 Pine Grove Township 1,074,000 17 (Base Project Allocation - $840,000) 18 (Land Allocation - $80,000) 19 (Design and Contingencies - $154,000) 20 (7) SR 81, Install Dynamic Message Signs 21 and Closed Circuit Television Cameras, 22 I-81 Corridor, Round 1, Various 23 Municipalities 415,000 24 (Base Project Allocation - $200,000) 25 (Design and Contingencies - $215,000) 26 (8) SR 81, Install Dynamic Message Signs, 27 Closed Circuit Television Cameras, 28 Highway Advisory Radio and Highway 29 Advisory Radio Beacons, I-81 Corridor, 30 Round 2, Various Municipalities 315,000 20080S1504B2454 - 110 -
1 (Base Project Allocation - $65,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $240,000) 4 (9) SR 1006, Wade Road, Reconstruction 5 from SR 1028 to Route 61, St. Clair 6 Borough 3,000,000 7 (Base Project Allocation - $3,000,000) 8 (10) I-81, Interstate Restoration and 9 Reconstruction 42,300,000 10 (Base Project Allocation - $42,300,000) 11 Section 355. Snyder County. 12 Projects are as follows: 13 (1) SR 1017, Resurfacing and Restoration 1,210,000 14 (Base Project Allocation - $1,200,000) 15 (Land Allocation - $10,000) 16 (2) SR 1023, Resurfacing and Restoration 320,000 17 (Base Project Allocation - $310,000) 18 (Land Allocation - $10,000) 19 (3) SR 104, Resurfacing and Restoration 205,000 20 (Base Project Allocation - $200,000) 21 (Land Allocation - $5,000) 22 (4) SR 2017, Resurfacing and Restoration 635,000 23 (Base Project Allocation - $625,000) 24 (Land Allocation - $10,000) 25 (5) SR 235, Resurfacing and Restoration 1,010,000 26 (Base Project Allocation - $1,000,000) 27 (Land Allocation - $10,000) 28 (6) SR 235, Resurfacing and Restoration 1,240,000 29 (Base Project Allocation - $1,230,000) 30 (Land Allocation - $10,000) 20080S1504B2454 - 111 -
1 (7) SR 35, Resurfacing and Restoration 1,510,000 2 (Base Project Allocation - $1,500,000) 3 (Land Allocation - $10,000) 4 (8) SR 522, Resurfacing and Restoration 1,175,000 5 (Base Project Allocation - $1,165,000) 6 (Land Allocation - $10,000) 7 (9) SR 522, Resurfacing and Restoration 10,000 8 (Land Allocation - $10,000) 9 (10) SR 522, Resurfacing and Restoration 305,000 10 (Base Project Allocation - $300,000) 11 (Land Allocation - $5,000) 12 Section 356. Somerset County. 13 Projects are as follows: 14 (1) SR 219, New Four-Lane Roadway 15 Alignment, US 219, Garrett, End of 16 Existing Four-Lane in Somerset Township 17 to Meyersdale Bypass in Summit 18 Township, Brothersvalley, Somerset and 19 Summit Townships 36,000,000 20 (Base Project Allocation - $27,000,000) 21 (Land Allocation - $7,000,000) 22 (Design and Contingencies - $2,000,000) 23 (2) SR 219, Paving, New Four-Lane Roadway 24 Alignment, US 219, Garrett, End of 25 Existing Four-Lane in Somerset Township 26 to Meyersdale Bypass in Summit 27 Township, Brothersvalley, Somerset and 28 Summit Townships 14,000,000 29 (Base Project Allocation - $14,000,000) 30 (3) SR 219, Construction, New Four-Lane 20080S1504B2454 - 112 -
1 Alignment, US 219, Garrett, End of 2 Existing Four-Lane in Somerset Township 3 to Meyersdale Bypass in Summit 4 Township, Brothersvalley, Somerset and 5 Summit Townships 20,000,000 6 (Base Project Allocation - $20,000,000) 7 (4) SR 219, New Four-Lane Roadway 8 Alignment, US 219, I-68, Maryland to 9 Meyersdale Bypass, Salisbury Borough, 10 Elk Lick and Summit Townships 51,000,000 11 (Base Project Allocation - $40,000,000) 12 (Land Allocation - $6,000,000) 13 (Design and Contingencies - $5,000,000) 14 (5) SR 3029, Reconstruction, Ream Road, T- 15 362, Intersection to Seven Springs 16 Borough Line, Seven Springs Borough, 17 Middlecreek and Milford Townships 7,450,000 18 (Base Project Allocation - $6,600,000) 19 (Land Allocation - $550,000) 20 (Design and Contingencies - $300,000) 21 (6) PA 160, Safety Improvement, 22 Construction of a Runaway Truck Ramp 772,000 23 (Base Project Allocation - $270,000) 24 (Land Allocation - $387,000) 25 (Design and Contingencies - $115,000) 26 (7) PA 281, Intersection Improvement 755,000 27 (Base Project Allocation - $370,000) 28 (Land Allocation - $200,000) 29 (Design and Contingencies - $185,000) 30 (8) SR 3041, Intersection Improvement, 20080S1504B2454 - 113 -
1 Construction of Left Turn Lanes and 2 Increasing the Roadway Curve Radius 301,000 3 (Base Project Allocation - $216,000) 4 (Land Allocation - $85,000) 5 (9) SR 3010, Highway Restoration 574,000 6 (Base Project Allocation - $574,000) 7 (10) SR 3037, Overlay and Intersection 8 Improvement 2,300,000 9 (Base Project Allocation - $2,300,000) 10 Section 357. Sullivan County. 11 Projects are as follows: 12 (1) SR 1015, Widen and Resurface, SR 1015 13 from SR 87 to Bradford County Line, 14 Cherry Township 422,000 15 (Base Project Allocation - $404,000) 16 (Design and Contingencies - $18,000) 17 (2) SR 220, Reconstruct to 24-Foot, Two- 18 Lane Highway 1,460,000 19 (Base Project Allocation - $1,456,000) 20 (Design and Contingencies - $4,000) 21 (3) SR 220, Resurfacing and Restoration 10,000 22 (Land Allocation - $10,000) 23 (4) SR 220, Resurfacing and Restoration 25,000 24 (Land Allocation - $25,000) 25 (5) SR 42, Resurfacing and Restoration 25,000 26 (Land Allocation - $25,000) 27 (6) SR 87, Resurfacing and Restoration 43,000 28 (Base Project Allocation - $3,000) 29 (Land Allocation - $40,000) 30 Section 358. Susquehanna County. 20080S1504B2454 - 114 -
1 Projects are as follows: 2 (1) SR 81, ITS Improvements and Purchases, 3 I-81 Corridor, Various Municipalities 480,000 4 (Base Project Allocation - $400,000) 5 (Design and Contingencies - $80,000) 6 (2) SR 2030, Remove Existing Concrete 7 Railroad Bridge Abutments 152,000 8 (Base Project Allocation - $152,000) 9 (3) I-81, Interstate Restoration and 10 Reconstruction 26,500,000 11 (Base Project Allocation - $26,500,000) 12 (4) SR 92, Intersection Improvement 380,000 13 (Base Project Allocation - $380,000) 14 (5) SR 81, Interchange Improvement, Ramp 15 Redesign 368,000 16 (Base Project Allocation - $100,000) 17 (Land Allocation - $208,000) 18 (Design and Contingencies - $60,000) 19 (6) SR 1033, Roadway and Slope Repair 276,000 20 (Base Project Allocation - $250,000) 21 (Land Allocation - $20,000) 22 (Design and Contingencies - $6,000) 23 (7) SR 247, Highway Restoration 336,000 24 (Base Project Allocation - $336,000) 25 (8) SR 267, Roadway and Slope Repair 829,000 26 (Base Project Allocation - $805,000) 27 (Design and Contingencies - $24,000) 28 (9) SR 29, Restoration, Roadway and Slope 29 Repair 420,000 30 (Base Project Allocation - $360,000) 20080S1504B2454 - 115 -
1 (Land Allocation - $50,000) 2 (Design and Contingencies - $10,000) 3 (10) SR 3023, Roadway and Slope Repair 518,000 4 (Base Project Allocation - $518,000) 5 Section 359. Tioga County. 6 Projects are as follows: 7 (1) SR 2005, Slide Repair and Slides 8 Correction, SR 2005, Segment 0530, 9 Mansfield Borough, Richmond Township 980,000 10 (Base Project Allocation - $840,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $120,000) 13 (2) SR 15, Study to Determine Needs of 14 Roadway Signing as I-99 250,000 15 (Land Allocation - $250,000) 16 (3) SR 15, Resurfacing and Restoration 1,441,000 17 (Base Project Allocation - $1,375,000) 18 (Land Allocation - $66,000) 19 (4) SR 15, Highway Restoration 50,000 20 (Land Allocation - $50,000) 21 (5) SR 2005, Resurfacing and Restoration 2,037,000 22 (Base Project Allocation - $1,940,000) 23 (Land Allocation - $97,000) 24 (6) SR 287, Resurfacing and Restoration 480,000 25 (Base Project Allocation - $470,000) 26 (Land Allocation - $10,000) 27 (7) SR 287, Resurfacing and Restoration 380,000 28 (Base Project Allocation - $370,000) 29 (Land Allocation - $10,000) 30 (8) SR 3019, Resurfacing and Restoration 1,426,000 20080S1504B2454 - 116 -
1 (Base Project Allocation - $1,360,000) 2 (Land Allocation - $66,000) 3 (9) SR 4024, Resurfacing and Restoration 2,118,000 4 (Base Project Allocation - $2,027,000) 5 (Land Allocation - $91,000) 6 (10) SR 6, Resurfacing and Restoration 735,000 7 (Base Project Allocation - $701,000) 8 (Land Allocation - $34,000) 9 (11) SR 6, Resurfacing and Restoration 2,020,000 10 (Base Project Allocation - $2,000,000) 11 (Land Allocation - $20,000) 12 Section 360. Union County. 13 Projects are as follows: 14 (1) SR 1004, Safety Improvement, SR 1004 15 from Manning Road to JPM Road, Kelly 16 Township 119,000 17 (Base Project Allocation - $87,000) 18 (Land Allocation - $22,000) 19 (Design and Contingencies - $10,000) 20 (2) I-80, Interstate Restoration and 21 Reconstruction 16,000,000 22 (Base Project Allocation - $16,000,000) 23 (3) SR 192, Resurfacing and Restoration 910,000 24 (Base Project Allocation - $900,000) 25 (Land Allocation - $10,000) 26 (4) SR 235, Resurfacing and Restoration 1,610,000 27 (Base Project Allocation - $1,600,000) 28 (Land Allocation - $10,000) 29 (5) SR 45, Resurfacing and Restoration 1,310,000 30 (Base Project Allocation - $1,300,000) 20080S1504B2454 - 117 -
1 (Land Allocation - $10,000) 2 (6) SR 45, Resurfacing and Restoration 1,760,000 3 (Base Project Allocation - $1,750,000) 4 (Land Allocation - $10,000) 5 (7) SR 45, Highway Reconstruction 3,150,000 6 (Base Project Allocation - $3,000,000) 7 (Land Allocation - $150,000) 8 Section 361. Venango County. 9 Projects are as follows: 10 (1) Wetland Banking, Design, Construct and 11 Monitor Wetlands, Phase II, Polk 12 Wetlands Site, Sandycreek Township 430,000 13 (Base Project Allocation - $250,000) 14 (Land Allocation - $50,000) 15 (Design and Contingencies - $130,000) 16 (2) Various Routes, Traffic Signal Program 17 for 2009, Safety Improvements, 18 Countywide, Various Municipalities 50,000 19 (Base Project Allocation - $50,000) 20 (3) Various Routes, Countywide Traffic 21 Signal Program for 2010, Safety 22 Improvements, Countywide, Various 23 Municipalities 50,000 24 (Base Project Allocation - $50,000) 25 (4) I-80, Interstate Restoration and 26 Reconstruction 14,300,000 27 (Base Project Allocation - $14,300,000) 28 (5) SR 417, Highway Restoration 1,563,000 29 (Base Project Allocation - $1,563,000) 30 Section 362. Warren County. 20080S1504B2454 - 118 -
1 Projects are as follows: 2 (1) SR 62, Turning Lane, Existing Signal 3 Improvement, SR 62 from SR 1008, Hatch 4 Run Road, to New York Line, Conewango 5 and Pine Grove Townships 630,000 6 (Base Project Allocation - $500,000) 7 (Land Allocation - $30,000) 8 (Design and Contingencies - $100,000) 9 Section 363. Washington County. 10 Projects are as follows: 11 (1) SR 1009, Intersection Improvement, SR 12 1009, Pike Street, and SR 4049, Country 13 Club Road, Chartiers Township 1,325,000 14 (Base Project Allocation - $300,000) 15 (Land Allocation - $500,000) 16 (Design and Contingencies - $525,000) 17 (2) SR 18, Highway Restoration, Atlasburg 18 to Four Lanes, Burgettstown, 19 Burgettstown Borough and Smith 20 Township 156,000 21 (Land Allocation - $1,000) 22 (Design and Contingencies - $155,000) 23 (3) SR 18, Approaches and Intersection 24 Improvement, PA 18 at Tylerdale, 25 Jefferson and Wylie Intersection, City 26 of Washington 1,190,000 27 (Base Project Allocation - $1,000,000) 28 (Land Allocation - $100,000) 29 (Design and Contingencies - $90,000) 30 (4) SR 19, Highway Restoration, US 19 from 20080S1504B2454 - 119 -
1 Conklin Road to PA 519, North Strabane 2 Township 97,000 3 (Land Allocation - $1,000) 4 (Design and Contingencies - $96,000) 5 (5) SR 19, Intersection Improvement, 6 Intersection SR 19 and Glenncannon 7 Drive, North Strabane Township 100,000 8 (Base Project Allocation - $100,000) 9 (6) SR 40, Highway Restoration, SR 4, 10 Segment 0670 from Beallsville to 11 Centerville, Centerville Borough, West 12 Pike Run Township 6,000,000 13 (Base Project Allocation - $6,000,000) 14 (7) SR 519, Highway Restoration, PA 519 15 from US 40 to I-70, Betterment, North 16 Bethlehem and Somerset Townships 147,000 17 (Land Allocation - $1,000) 18 (Design and Contingencies - $146,000) 19 (8) SR 70, Reconstruction, I-70, Segment 20 0040 to Segment 0100 and Segment 0041 21 to Segment 0101, Claysville Borough, 22 Buffalo and Donegal Townships 2,710,000 23 (Base Project Allocation - $2,410,000) 24 (Design and Contingencies - $300,000) 25 (9) SR 70, Restoration, I-70, Segment 0214 26 to Segment 0305, Somerset and South 27 Strabane Townships 775,000 28 (Base Project Allocation - $775,000) 29 (10) SR 70, Interstate Restoration, 30 Rehabilitation and Repair on 20080S1504B2454 - 120 -
1 Substructures of 3 Bridges, I-70, 2 Segment 0180 to Segment 0215, South 3 Strabane Township 480,000 4 (Base Project Allocation - $480,000) 5 (11) Various Routes, Miscellaneous ITS 6 Improvements and Purchases, Countywide, 7 Various Municipalities 115,000 8 (Base Project Allocation - $80,000) 9 (Design and Contingencies - $35,000) 10 (12) SR 136, Intersection Improvement, 11 Realignment of SR 136 886,000 12 (Base Project Allocation - $760,000) 13 (Land Allocation - $44,000) 14 (Design and Contingencies - $82,000) 15 (13) I-70, Interstate Restoration and 16 Reconstruction 40,000,000 17 (Base Project Allocation - $40,000,000) 18 (14) I-79, Interstate Restoration and 19 Reconstruction 23,400,000 20 (Base Project Allocation - $23,400,000) 21 (15) PA 136, Intersection Improvement 3,363,000 22 (Base Project Allocation - $2,005,000) 23 (Land Allocation - $689,000) 24 (Design and Contingencies - $649,000) 25 (16) SR 1002, Intersection Improvement and 26 Signalization 1,581,000 27 (Base Project Allocation - $1,515,000) 28 (Design and Contingencies - $66,000) 29 (17) SR 19, Highway Restoration 1,120,000 30 (Base Project Allocation - $1,120,000) 20080S1504B2454 - 121 -
1 (18) SR 519, Intersection Improvement, 2 Traffic Signal and Turning Lanes 258,000 3 (Base Project Allocation - $169,000) 4 (Land Allocation - $26,000) 5 (Design and Contingencies - $63,000) 6 Section 364. Wayne County. 7 Projects are as follows: 8 (1) SR 84, ITS Improvements and Purchases, 9 I-84 Corridor and I-380 Corridor, 10 Various Municipalities 240,000 11 (Base Project Allocation - $200,000) 12 (Design and Contingencies - $40,000) 13 (2) I-84, Interstate Restoration and 14 Reconstruction 5,800,000 15 (Base Project Allocation - $5,800,000) 16 (3) SR 590, Intersection Improvement 1,820,000 17 (Base Project Allocation - $1,560,000) 18 (Design and Contingencies - $260,000) 19 (4) SR 1023, Restoration, Roadway and 20 Slope Repair 650,000 21 (Base Project Allocation - $600,000) 22 (Land Allocation - $50,000) 23 Section 365. Westmoreland County. 24 Projects are as follows: 25 (1) SR 1045, Environmental Mitigation, SR 26 1045, Stream Mitigation, Unity 27 Township 300,000 28 (Base Project Allocation - $300,000) 29 (2) SR 130, Intersection Improvement, SR 30 130 and College Avenue, Hempfield 20080S1504B2454 - 122 -
1 Township and City of Jeannette 125,000 2 (Base Project Allocation - $125,000) 3 (3) SR 30, Highway Restoration, SR 30 from 4 Theater Street to PA 217, Derry and 5 Unity Townships 3,500,000 6 (Base Project Allocation - $3,500,000) 7 (4) SR 30, Highway Restoration, US 30 8 Betterment, Hempfield Township 6,200,000 9 (Base Project Allocation - $6,200,000) 10 (5) SR 30, Widen to Provide Center and 11 Left Turning Lane and Add Signals, SR 12 30 Corridor from Irwin Bridge to Lower 13 Circleville, Irwin Borough and North 14 Huntingdon Township 800,000 15 (Base Project Allocation - $600,000) 16 (Land Allocation - $120,000) 17 (Design and Contingencies - $80,000) 18 (6) SR 30, Highway Restoration, SR 30 from 19 Robbins Station Road to Central Avenue, 20 Irwin Borough, North Huntingdon 21 Township 2,800,000 22 (Base Project Allocation - $2,800,000) 23 (7) SR 30, Widen, Add Lane, SR 30, 24 Allegheny County Line to Leger Road, SR 25 4019, North Huntingdon Township 920,000 26 (Base Project Allocation - $700,000) 27 (Land Allocation - $160,000) 28 (Design and Contingencies - $60,000) 29 (8) SR 30, Widen to Provide Center and 30 Left Turning Lane and Add Signals where 20080S1504B2454 - 123 -
1 Warranted, Add Lane, SR 30 from SR 4019 2 to Malts Lane, North Huntingdon 3 Township 300,000 4 (Base Project Allocation - $100,000) 5 (Land Allocation - $120,000) 6 (Design and Contingencies - $80,000) 7 (9) SR 780, Intersection Improvement, New 8 Traffic Signal, PA 780 and PA 380 9 Intersection, Washington Township 315,000 10 (Base Project Allocation - $240,000) 11 (Design and Contingencies - $75,000) 12 (10) I-70, Interstate Restoration and 13 Reconstruction 16,600,000 14 (Base Project Allocation - $16,600,000) 15 (11) PA 66, Intersection Improvement, 16 Signal Improvements and Add Lane 2,463,000 17 (Base Project Allocation - $1,839,000) 18 (Land Allocation - $260,000) 19 (Design and Contingencies - $364,000) 20 (12) SR 51, Intersection Improvement, Add 21 Left Turning Lanes 3,823,000 22 (Base Project Allocation - $2,813,000) 23 (Land Allocation - $306,000) 24 (Design and Contingencies - $704,000) 25 Section 366. Wyoming County. 26 Projects are as follows: 27 (1) US 6, ITS Improvements and Purchases, 28 US 6 Corridor, Various Municipalities 120,000 29 (Base Project Allocation - $100,000) 30 (Design and Contingencies - $20,000) 20080S1504B2454 - 124 -
1 (2) SR 4015, Highway Restoration, Slide 2 Repair 117,000 3 (Land Allocation - $117,000) 4 (3) SR 2007, Restoration, Roadway and 5 Slope Repair 409,000 6 (Base Project Allocation - $409,000) 7 (4) SR 4001, Restoration, Roadway and 8 Slope Repair 288,000 9 (Base Project Allocation - $288,000) 10 Section 367. York County. 11 Projects are as follows: 12 (1) SR 30, Highway Restoration, Concrete 13 Rehabilitation, US 30, Pavement 14 Grinding from PA 74 to I-83, Manchester 15 and West Manchester Townships and City 16 of York 2,995,000 17 (Base Project Allocation - $2,920,000) 18 (Design and Contingencies - $75,000) 19 (2) SR 83, Interchange Improvement, I-83, 20 Exit 19 and PA 462 Interchange, 21 Springettsbury Township 100,000 22 (Design and Contingencies - $100,000) 23 (3) I-83, Interstate Restoration and 24 Reconstruction 39,000,000 25 (Base Project Allocation - $39,000,000) 26 (4) PA 124, Safety Improvement, Widen 1,374,000 27 (Base Project Allocation - $1,374,000) 28 (5) PA 124, Safety Improvement, Shoulder 29 Improvement and Reduce S Curve 365,000 30 (Base Project Allocation - $323,000) 20080S1504B2454 - 125 -
1 (Design and Contingencies - $42,000) 2 (6) PA 24, Safety Improvement, Widen and 3 Add Lanes 5,805,000 4 (Base Project Allocation - $969,000) 5 (Land Allocation - $74,000) 6 (Design and Contingencies - $4,762,000) 7 (7) SR 74, Corridor Safety Improvement, 8 Widen and Overlay, Add Center Turn 9 Lane 86,000 10 (Base Project Allocation - $86,000) 11 (8) SR 83, Interchange Improvement, 12 Lengthen Ramps 200,000 13 (Land Allocation - $200,000) 14 (9) SR 462, MARKET STREET, MILLING AND <-- 15 REPAVING, CITY OF YORK 1,000,000 16 (BASE PROJECT ALLOCATION - $1,000,000) 17 (10) SR 462, MARKET STREET, DUKE STREET TO 18 HARRISON STREET, RECONSTRUCTION AND 19 UPGRADING OF SIGNALIZATION, CITY OF 20 YORK 750,000 21 (BASE PROJECT ALLOCATION - $750,000) 22 Section 368. Statewide projects. 23 Projects are as follows: 24 (1) Various Routes, Capitalization of 25 Pennsylvania Infrastructure Bank, 26 Various Projects, Statewide 90,000,000 27 (Base Project Allocation - $90,000,000) 28 (2) Various Routes, Intersection of all 29 State Routes with Other State Routes, 30 Install or Replace Curb Cut Ramps as 20080S1504B2454 - 126 -
1 Required by The Americans with 2 Disabilities Act, Various Projects, 3 Statewide 400,000,000 4 (Base Project Allocation - 5 $400,000,000) 6 CHAPTER 5 7 (RESERVED) 8 CHAPTER 7 9 MISCELLANEOUS PROVISIONS 10 Section 701. Federal funds. <-- 11 All moneys received from the Federal Government for the 12 construction of the projects specifically itemized in this act 13 are also hereby appropriated for those projects. 14 Section 702. Allocation of funds. 15 Whenever as determined by the Department of Transportation 16 that the full estimated financial costs of the projects itemized 17 in this act are not necessary for the proper design, acquisition 18 or construction of such projects, the excess funds no longer 19 required may be allocated by the Department of Transportation to 20 increase the estimated costs of any one or more of the projects 21 specifically itemized in a capital budget. 22 Section 703. Estimated useful life. 23 The General Assembly states that the estimated useful life of 24 the highway capital projects itemized in this act is 30 years. 25 SECTION 701. DEBT AUTHORIZATION. <-- 26 THE GOVERNOR, AUDITOR GENERAL AND STATE TREASURER ARE HEREBY 27 AUTHORIZED AND DIRECTED TO BORROW FROM TIME TO TIME, IN ADDITION 28 TO ANY AUTHORIZATION HERETOFORE OR HEREAFTER ENACTED, ON THE 29 CREDIT OF THE COMMONWEALTH, SUBJECT TO THE LIMITATIONS PROVIDED 30 IN THE CURRENT CAPITAL BUDGET, MONEY NOT EXCEEDING IN THE 20080S1504B2454 - 127 -
1 AGGREGATE THE SUM OF $4,716,904,000 AS MAY BE FOUND NECESSARY TO 2 CARRY OUT THE ACQUISITION AND CONSTRUCTION OF THE STATE PROJECTS 3 SPECIFICALLY ITEMIZED IN THIS ACT. 4 SECTION 702. ISSUE OF BONDS. 5 THE INDEBTEDNESS AUTHORIZED IN THIS ACT SHALL BE INCURRED 6 FROM TIME TO TIME AND SHALL BE EVIDENCED BY ONE OR MORE SERIES 7 OF GENERAL OBLIGATION BONDS OF THE COMMONWEALTH IN SUCH 8 AGGREGATE PRINCIPAL AMOUNT FOR EACH SERIES AS THE GOVERNOR, 9 AUDITOR GENERAL AND STATE TREASURER SHALL DETERMINE, BUT THE 10 LATEST STATED MATURITY DATE SHALL NOT EXCEED 30 YEARS FROM THE 11 DATE OF THE BOND FIRST ISSUED FOR EACH SERIES. 12 SECTION 703. ESTIMATED USEFUL LIFE OF PROJECTS. 13 THE GENERAL ASSEMBLY STATES THE ESTIMATED USEFUL LIFE OF THE 14 PROJECTS ITEMIZED IN THIS ACT AS 30 YEARS. 15 SECTION 704. APPROPRIATION. 16 THE NET PROCEEDS OF THE SALE OF THE OBLIGATIONS AUTHORIZED IN 17 THIS ACT ARE HEREBY APPROPRIATED FROM THE CAPITAL FACILITIES 18 FUND TO THE DEPARTMENT IN THE MAXIMUM AMOUNT OF $4,716,904,000 19 TO BE USED BY IT EXCLUSIVELY TO DEFRAY THE FINANCIAL COSTS OF 20 THE STATE PROJECTS SPECIFICALLY ITEMIZED IN THIS CAPITAL BUDGET. 21 AFTER RESERVING OR PAYING THE EXPENSES OF THE SALE OF THE 22 OBLIGATION, THE STATE TREASURER SHALL PAY OUT TO THE DEPARTMENT 23 THE MONEYS AS REQUIRED AND CERTIFIED BY IT TO BE LEGALLY DUE AND 24 PAYABLE. 25 SECTION 705. FEDERAL FUNDS. 26 IN ADDITION TO THOSE FUNDS APPROPRIATED IN CHAPTER 3, ALL 27 MONEYS RECEIVED FROM THE FEDERAL GOVERNMENT FOR THE PROJECTS 28 SPECIFICALLY ITEMIZED IN THIS ACT ARE ALSO HEREBY APPROPRIATED 29 FOR THOSE PROJECTS. 30 SECTION 706. ALLOCATION OF FUNDS. 20080S1504B2454 - 128 -
1 WHENEVER AS DETERMINED BY THE DEPARTMENT OF TRANSPORTATION
2 THAT THE FULL ESTIMATED FINANCIAL COSTS OF THE PROJECTS ITEMIZED
3 IN THIS ACT ARE NOT NECESSARY FOR THE PROPER DESIGN, ACQUISITION
4 OR CONSTRUCTION OF SUCH PROJECTS, THE EXCESS FUNDS NO LONGER
5 REQUIRED MAY BE ALLOCATED BY THE DEPARTMENT OF TRANSPORTATION TO
6 INCREASE THE ESTIMATED COSTS OF ANY ONE OR MORE OF THE PROJECTS
7 SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET.
8 SECTION 704 707. EFFECTIVE DATE. <--
9 THIS ACT SHALL TAKE EFFECT IMMEDIATELY.
F17L86RLE/20080S1504B2454 - 129 -