     1  Providing for the highway capital budget project itemization for
     2     the fiscal year 2008-2009 TO BE FINANCED FROM CURRENT REVENUE  <--
     3     OR BY THE INCURRING OF DEBT.

     4     The General Assembly of the Commonwealth of Pennsylvania
     5  hereby enacts as follows:
     6                             CHAPTER 1
     7                         GENERAL PROVISIONS
     8  Section 101.  Short title.
     9     This act shall be known and may be cited as the Highway
    10  Capital Budget Project Itemization Act of 2008-2009.
    11  Section 102.  Total authorization.
    12     The total authorization for the capital projects itemized in
    13  Chapter 3 and to be constructed by the Department of
    14  Transportation, its successors or assigns and to be financed BY   <--
    15  THE INCURRING OF DEBT OR from current revenues of the Motor
    16  License Fund shall be $3,361,513,000 $4,655,654,000               <--
    17  $4,716,904,000.                                                   <--

     1  Section 103.  Itemization of public highway projects.
     2     Additional capital projects in the category of public highway
     3  projects to be constructed by the Department of Transportation,
     4  its successors or assigns and to be financed BY THE INCURRING OF  <--
     5  DEBT OR from current revenues of the Motor License Fund are
     6  itemized in Chapter 3, together with their respective estimated
     7  financial costs.
     8                             CHAPTER 3
     9                         ITEMIZED PROJECTS
    10                                                           Total
    11                                                          Project
    12             Project                                    Allocation
    13  Section 301.  Adams County.
    14     Projects are as follows:
    15         (1)  PA 94, Reconstruct, Add Lane, Widen        1,367,000
    16             (Base Project Allocation - $,1,367,000)
    17  Section 302.  Allegheny County.
    18     Projects are as follows:
    19         (1)  I-279, ITS Expansion, Corridor Safety
    20             Improvement, I-279 from Camp Horne Road
    21             to I-79, Franklin Park Borough and Ross
    22             Township                                      763,000
    23             (Base Project Allocation - $763,000)
    24         (2)  SR 1001, Concrete Pavement
    25             Reconstruction, Rehabilitation, SR
    26             1001, Freeport Road No.2 from Ross
    27             Street to Burtner Road, Brackenridge
    28             and Tarentum Boroughs and Harrison
    29             Township                                    4,778,000
    30             (Base Project Allocation - $4,328,000)
    20080S1504B2454                  - 2 -     

     1             (Design and Contingencies - $450,000)
     2         (3)  SR 1001, Concrete Pavement
     3             Reconstruction, Rehabilitation, SR
     4             1001, Freeport Road No.3 from Burtner
     5             Road to Brackenridge Borough Line,
     6             Brackenridge Borough and Harrison
     7             Township                                    3,875,000
     8             (Base Project Allocation - $3,520,000)
     9             (Design and Contingencies - $355,000)
    10         (4)  SR 1001, Concrete Pavement
    11             Reconstruction, Rehabilitation, SR
    12             1001, Freeport Road No.1 from Baileys
    13             Run to North of Larusse Boulevard, East
    14             Deer and Tarentum Townships                 1,162,000
    15             (Base Project Allocation - $1,056,000)
    16             (Design and Contingencies - $106,000)
    17         (5)  SR 1001, Concrete Pavement
    18             Reconstruction, Rehabilitation, SR
    19             1001, Etna Bypass, Etna Borough               696,000
    20             (Base Project Allocation - $632,000)
    21             (Design and Contingencies - $64,000)
    22         (6)  SR 1013, Concrete Pavement
    23             Reconstruction, Rehabilitation, SR
    24             1013, Saxonburg Boulevard, Indiana and
    25             West Deer Townships                         3,054,000
    26             (Base Project Allocation - $2,774,000)
    27             (Design and Contingencies - $280,000)
    28         (7)  SR 130, Safety Improvement, Allegheny
    29             River Boulevard from Penn Hills to
    30             Verona, Penn Hills Township and City of
    20080S1504B2454                  - 3 -     

     1             Pittsburgh                                    588,000
     2             (Base Project Allocation - $553,000)
     3             (Design and Contingencies - $35,000)
     4         (8)  SR 148, Concrete Pavement
     5             Reconstruction, Rehabilitation, SR 148
     6             from Eden Park Boulevard to Lincoln
     7             Highway, City of McKeesport and North
     8             Versailles Township                         3,080,000
     9             (Base Project Allocation - $2,800,000)
    10             (Design and Contingencies - $280,000)
    11         (9)  SR 19, Concrete Pavement
    12             Reconstruction, Rehabilitation, Perry
    13             Highway, Westbound from Pine Creek Road
    14             to South Church Road, McCandless and
    15             Pine Townships                              2,221,000
    16             (Base Project Allocation - $2,016,000)
    17             (Design and Contingencies - $205,000)
    18         (10)  SR 19, Concrete Pavement
    19             Reconstruction, Rehabilitation, Perry
    20             Highway, Eastbound from Pine Creek Road
    21             to South Church Road, McCandless and
    22             Pine Townships                              2,221,000
    23             (Base Project Allocation - $2,016,000)
    24             (Design and Contingencies - $205,000)
    25         (11)  SR 19, Concrete Pavement
    26             Reconstruction, Rehabilitation,
    27             Washington Road, Eastbound from
    28             Gilkeson Road to Cochran Road, Mt.
    29             Lebanon Township                            1,206,000
    30             (Base Project Allocation - $1,096,000)
    20080S1504B2454                  - 4 -     

     1             (Design and Contingencies - $110,000)
     2         (12)  SR 19, Concrete Pavement
     3             Reconstruction, Rehabilitation,
     4             Washington Road, Westbound from
     5             Gilkeson Road to Cochran Road, Mt.
     6             Lebanon Township                              898,000
     7             (Base Project Allocation - $816,000)
     8             (Design and Contingencies - $82,000)
     9         (13)  SR 19, Upgrade and Rebuild Ten
    10             Signals, Safety Improvement, Perry
    11             Highway from Ivory to Sewickley Oakmont
    12             Road, West View Borough, Pine and Ross
    13             Townships and City of Pittsburgh               50,000
    14             (Design and Contingencies - $50,000)
    15         (14)  SR 19, Concrete Pavement
    16             Reconstruction, Rehabilitation, SR 19,
    17             Boyce Road, Upper St. Clair Township        1,098,000
    18             (Base Project Allocation - $998,000)
    19             (Design and Contingencies - $100,000)
    20         (15)  SR 19, Concrete Pavement
    21             Reconstruction, Rehabilitation,
    22             Perrysville Avenue from Bellevue Road
    23             to Harden Drive, West View Borough          1,259,000
    24             (Base Project Allocation - $1,144,000)
    25             (Design and Contingencies - $115,000)
    26         (16)  SR 2048, Restoration, Rehabilitation,
    27             Safety Improvements, Business Route 22
    28             from Rodi Road, SR 791 to Mosside
    29             Boulevard, SR 48, Churchill and
    30             Monroeville Boroughs and Wilkins
    20080S1504B2454                  - 5 -     

     1             Township                                    1,998,000
     2             (Base Project Allocation - $1,974,000)
     3             (Design and Contingencies - $24,000)
     4         (17)  SR 2057, Concrete Pavement
     5             Reconstruction, Rehabilitation, SR
     6             2057, Haymaker Road, Monroeville
     7             Borough                                       407,000
     8             (Base Project Allocation - $370,000)
     9             (Design and Contingencies - $37,000)
    10         (18)  SR 2058, Pavement Reconstruction,
    11             Rehabilitation, SR 2058, Leechburg
    12             Road, Penn Hills Township                     966,000
    13             (Base Project Allocation - $878,000)
    14             (Design and Contingencies - $88,000)
    15         (19)  SR 2073, Concrete Pavement
    16             Reconstruction, Rehabilitation,
    17             Allegheny River Boulevard from Sandy
    18             Creek to College, Verona and Oakmont
    19             Boroughs and Penn Hills Township              805,000
    20             (Base Project Allocation - $731,000)
    21             (Design and Contingencies - $74,000)
    22         (20)  SR 2073, Concrete Pavement
    23             Reconstruction, Rehabilitation, SR 2073
    24             from South Avenue to Plum Street,
    25             Verona Borough                                330,000
    26             (Base Project Allocation - $300,000)
    27             (Design and Contingencies - $30,000)
    28         (21)  SR 2104, Concrete Pavement
    29             Reconstruction, Rehabilitation, SR
    30             2104, Churchill Road, Churchill
    20080S1504B2454                  - 6 -     

     1             Borough                                       410,000
     2             (Base Project Allocation - $372,000)
     3             (Design and Contingencies - $38,000)
     4         (22)  SR 2108, Concrete Pavement
     5             Reconstruction, Rehabilitation, SR
     6             2108, Wilkins Avenue, City of
     7             Pittsburgh                                    363,000
     8             (Base Project Allocation - $330,000)
     9             (Design and Contingencies - $33,000)
    10         (23)  SR 2116, Concrete Pavement
    11             Reconstruction, Rehabilitation, SR
    12             2116, Bettis Road, Dravosburg and West
    13             Mifflin Boroughs                              429,000
    14             (Base Project Allocation - $390,000)
    15             (Design and Contingencies - $39,000)
    16         (24)  SR 2128, Concrete Pavement
    17             Reconstruction, Rehabilitation, Tenth
    18             Street Bypass Phase II, SR 8041 to Fort
    19             Duquesne Boulevard, City of Pittsburgh        616,000
    20             (Base Project Allocation - $560,000)
    21             (Design and Contingencies - $56,000)
    22         (25)  SR 2128, Concrete Pavement
    23             Reconstruction, Rehabilitation, SR
    24             3004, McMurray Road, City of
    25             Pittsburgh                                    623,000
    26             (Base Project Allocation - $566,000)
    27             (Design and Contingencies - $57,000)
    28         (26)  SR 2128, Concrete Pavement
    29             Reconstruction, Rehabilitation, Tenth
    30             Street Bypass Phase I, SR 8041 to Fort
    20080S1504B2454                  - 7 -     

     1             Duquesne Boulevard, City of Pittsburgh        616,000
     2             (Base Project Allocation - $560,000)
     3             (Design and Contingencies - $56,000)
     4         (27)  SR 279, Concrete Pavement
     5             Reconstruction, Rehabilitation, SR 279,
     6             Robinson Township to Fort Pitt Tunnel,
     7             Carnegie, Green Tree and Rosslyn Farms
     8             Boroughs, Collier, Scott and Robinson
     9             Townships and City of Pittsburgh            2,860,000
    10             (Base Project Allocation - $2,600,000)
    11             (Design and Contingencies - $260,000)
    12         (28)  SR 28, Concrete Pavement
    13             Reconstruction, Rehabilitation, SR 28,
    14             Northbound from Baily's Run to County
    15             Line, East Deer and Harrison Townships     13,750,000
    16             (Base Project Allocation - $12,500,000)
    17             (Design and Contingencies - $1,250,000)
    18         (29)  SR 28, Concrete Pavement
    19             Reconstruction, Rehabilitation, SR 28
    20             Southbound from Baily's Run to County
    21             Line, East Deer and Harrison Townships     13,750,000
    22             (Base Project Allocation - $12,500,000)
    23             (Design and Contingencies - $1,250,000)
    24         (30)  SR 28, Concrete Pavement
    25             Reconstruction, Rehabilitation, SR 28
    26             from Milvale to Etna, Etna Borough and
    27             Shaler Township                             3,850,000
    28             (Base Project Allocation - $3,500,000)
    29             (Design and Contingencies - $350,000)
    30         (31)  SR 30, Concrete Pavement
    20080S1504B2454                  - 8 -     

     1             Reconstruction, Rehabilitation, SR 30
     2             from County Line to Clinton Road,
     3             Findlay Township                            1,650,000
     4             (Base Project Allocation - $1,500,000)
     5             (Design and Contingencies - $150,000)
     6         (32)  SR 3005, Concrete Pavement
     7             Reconstruction, Rehabilitation, SR
     8             3005, Station Street to Bank Street,
     9             Bridgeville Borough                           421,000
    10             (Base Project Allocation - $381,000)
    11             (Design and Contingencies - $40,000)
    12         (33)  SR 3009, Concrete Pavement
    13             Reconstruction, Rehabilitation, SR
    14             3009, Baptist Road, Bethel Park and
    15             Whitehall Boroughs                          1,130,000
    16             (Base Project Allocation - $1,027,000)
    17             (Design and Contingencies - $103,000)
    18         (34)  SR 3009, Concrete Pavement
    19             Reconstruction, Rehabilitation, SR
    20             3009, South Park Road, Bethel Park
    21             Borough                                       469,000
    22             (Base Project Allocation - $426,000)
    23             (Design and Contingencies - $43,000)
    24         (35)  SR 3028, Slide Correction, Concrete
    25             Pavement Reconstruction,
    26             Rehabilitation, SR 3028, at Presto and
    27             Sygan Roads, South Fayette Township         1,100,000
    28             (Base Project Allocation - $1,000,000)
    29             (Design and Contingencies - $100,000)
    30         (36)  SR 3038, Safety Improvement, Conner
    20080S1504B2454                  - 9 -     

     1             Road from Washington Road to Library
     2             Road, Bethel Park Borough and Mt.
     3             Lebanon Township                              354,000
     4             (Base Project Allocation - $304,000)
     5             (Design and Contingencies - $50,000)
     6         (37)  SR 3044, Concrete Pavement
     7             Reconstruction, Rehabilitation, Castle
     8             Shannon Boulevard from Washington Road
     9             to Scott Road, Mt. Lebanon Township         1,100,000
    10             (Base Project Allocation - $1,000,000)
    11             (Design and Contingencies - $100,000)
    12         (38)  SR 3054, Slide Correction, Concrete
    13             Pavement Reconstruction,
    14             Rehabilitation, SR 3054, Segment 0020
    15             and Segment 0030, Collier Township          1,100,000
    16             (Base Project Allocation - $1,000,000)
    17             (Design and Contingencies - $100,000)
    18         (39)  SR 3065, New Two-Lane Roadway,
    19             Banksville Connection to Wabash Tunnel
    20             to Banksville Road in City of
    21             Pittsburgh, Green Tree Borough             14,620,000
    22             (Base Project Allocation - $10,000,000)
    23             (Land Allocation - $2,000,000)
    24             (Design and Contingencies - $2,620,000)
    25         (40)  SR 3069, Concrete Pavement
    26             Reconstruction, Rehabilitation, SR 3069
    27             from Liberty Bridge to 6th Avenue, City
    28             of Pittsburgh                               1,650,000
    29             (Base Project Allocation - $1,500,000)
    30             (Design and Contingencies - $150,000)
    20080S1504B2454                 - 10 -     

     1         (41)  SR 3069, Concrete Pavement
     2             Reconstruction, Rehabilitation, West
     3             Liberty Avenue from McFarland to Saw
     4             Mill Run, Dormont Borough and City of
     5             Pittsburgh                                  2,139,000
     6             (Base Project Allocation - $1,944,000)
     7             (Design and Contingencies - $195,000)
     8         (42)  SR 3085, Concrete Pavement
     9             Reconstruction, Rehabilitation, SR
    10             3085, Forest Grove Road, Robinson
    11             Township                                      590,000
    12             (Base Project Allocation - $536,000)
    13             (Design and Contingencies - $54,000)
    14         (43)  SR 3087, Concrete Pavement
    15             Reconstruction, Rehabilitation, SR
    16             3087, Thorn Run Road, Moon Township           752,000
    17             (Base Project Allocation - $683,000)
    18             (Design and Contingencies - $69,000)
    19         (44)  SR 3092, Concrete Pavement
    20             Reconstruction, Rehabilitation, SR
    21             3092, Broadway Street, Stowe Township         398,000
    22             (Base Project Allocation - $361,000)
    23             (Design and Contingencies - $37,000)
    24         (45)  SR 366, Signal Improvements at 4
    25             Intersections, SR 8 and SR 366, 2
    26             Intersections Each, Tarentum Borough
    27             and Shaler Township                            50,000
    28             (Base Project Allocation - $50,000)
    29         (46)  SR 376, Installation of ITS Equipment
    30             to Include Variable Traffic System, I-
    20080S1504B2454                 - 11 -     

     1             376 from South Braddock Avenue to SR
     2             2048, Business Route 22, Braddock
     3             Hills, Churchill, Edgewood, Wilkinsburg
     4             Boroughs and City of Pittsburgh                35,000
     5             (Base Project Allocation - $35,000)
     6         (47)  SR 376, Pavement Reconstruction,
     7             Rehabilitation, Squirrel Hill Tunnel
     8             Rehabilitation No.2, City of
     9             Pittsburgh                                  4,950,000
    10             (Base Project Allocation - $4,500,000)
    11             (Design and Contingencies - $450,000)
    12         (48)  SR 400, Concrete Pavement
    13             Reconstruction, Rehabilitation, Bigelow
    14             Boulevard, Northbound Craig to
    15             Bloomfield Bridge, City of Pittsburgh         550,000
    16             (Base Project Allocation - $500,000)
    17             (Design and Contingencies - $50,000)
    18         (49)  SR 400, Concrete Pavement
    19             Reconstruction, Rehabilitation, Bigelow
    20             Boulevard, Southbound Craig to
    21             Bloomfield Bridge, City of Pittsburgh         550,000
    22             (Base Project Allocation - $500,000)
    23             (Design and Contingencies - $50,000)
    24         (50)  SR 4003, Concrete Pavement
    25             Reconstruction, Rehabilitation, SR
    26             4003, McKnight Road Phase II, Ross and
    27             McCandless Townships                        6,592,000
    28             (Base Project Allocation - $5,992,000)
    29             (Design and Contingencies - $600,000)
    30         (51)  SR 4003, Concrete Pavement
    20080S1504B2454                 - 12 -     

     1             Reconstruction, Rehabilitation, SR
     2             4003, McKnight Road Phase I, Ross and
     3             McCandless Townships                        6,458,000
     4             (Base Project Allocation - $5,858,000)
     5             (Design and Contingencies - $600,000)
     6         (52)  SR 4024, Concrete Pavement
     7             Reconstruction, Rehabilitation, SR
     8             4024, Duncan Avenue, McCandless
     9             Township                                      836,000
    10             (Base Project Allocation - $760,000)
    11             (Design and Contingencies - $76,000)
    12         (53)  SR 4036, Concrete Pavement
    13             Reconstruction, Rehabilitation, Big
    14             Sewickley Creek Road from Sunset Drive
    15             to Hitzell Hill Road, Bell Acres and
    16             Economy Boroughs                            1,870,000
    17             (Base Project Allocation - $1,700,000)
    18             (Design and Contingencies - $170,000)
    19         (54)  SR 4052, Intersection Improvement,
    20             Widen, Warrendale-Bayne Road,
    21             Improvements, Phase II, Marshall
    22             Township                                       99,000
    23             (Base Project Allocation - $99,000)
    24         (55)  SR 4084, Concrete Pavement
    25             Reconstruction, Rehabilitation, SR
    26             4084, Western Avenue and Ridge from
    27             Chateau Street to Brighton Road, City
    28             of Pittsburgh                                 784,000
    29             (Base Project Allocation - $712,000)
    30             (Design and Contingencies - $72,000)
    20080S1504B2454                 - 13 -     

     1         (56)  SR 48, Concrete Pavement
     2             Reconstruction, Rehabilitation, SR 48,
     3             Scenery Drive, Forward and Elizabeth
     4             Townships                                     715,000
     5             (Base Project Allocation - $650,000)
     6             (Design and Contingencies - $65,000)
     7         (57)  SR 48, Concrete Pavement
     8             Reconstruction, Rehabilitation, SR 48,
     9             T-130 to Macbeth Drive, Monroeville
    10             Borough                                     2,120,000
    11             (Base Project Allocation - $1,920,000)
    12             (Design and Contingencies - $200,000)
    13         (58)  SR 50, Upgrade and Coordinate 8
    14             Signals, Safety Improvement, PA 50,
    15             Collier Street to Noblestown and
    16             Poplar, Carnegie, Green Tree and
    17             Heidelberg Boroughs, Scott Township and
    18             City of Pittsburgh                             18,000
    19             (Design and Contingencies - $18,000)
    20         (59)  SR 51, Traffic Signal Upgrade, 9
    21             Intersections, Existing Signal
    22             Improvement, Saw Mill Run Boulevard
    23             from Edgebrooke Avenue to Stewart
    24             Avenue, Brentwood and Whitehall
    25             Boroughs and City of Pittsburgh               232,000
    26             (Base Project Allocation - $232,000)
    27         (60)  SR 51, Concrete Pavement
    28             Reconstruction, Rehabilitation,
    29             Clairton Boulevard from Lewis Run to
    30             Cloverleaf, Pleasant Hills Borough          7,260,000
    20080S1504B2454                 - 14 -     

     1             (Base Project Allocation - $6,600,000)
     2             (Design and Contingencies - $660,000)
     3         (61)  SR 60, Concrete Pavement
     4             Reconstruction, Rehabilitation, SR 60
     5             from Business Route 60 to South
     6             Expressway, Findlay and Moon Townships     10,474,000
     7             (Base Project Allocation - $9,522,000)
     8             (Design and Contingencies - $952,000)
     9         (62)  SR 60, New Interchange, Dick's
    10             Sporting Goods Headquarters, Between SR
    11             60 and Business Route 60, Clinton Road
    12             and Flaugherty Run Interchange, Findlay
    13             Township                                    1,868,000
    14             (Base Project Allocation - $1,868,000)
    15         (63)  SR 60, Concrete Pavement
    16             Reconstruction, Rehabilitation, SR 60,
    17             South Expressway No.2, Segment 0353 to
    18             Segment 0392 from Airport to Flaugherty
    19             Run, Findlay and Moon Townships            18,500,000
    20             (Base Project Allocation - $18,500,000)
    21         (64)  SR 60, Concrete Pavement
    22             Reconstruction, Rehabilitation, SR 60,
    23             South Expressway No.1, Segment 0352 to
    24             Segment 0392 from Airport to Flaugherty
    25             Run, Findlay and Moon Townships            18,500,000
    26             (Base Project Allocation - $18,500,000)
    27         (65)  SR 60, Concrete Pavement
    28             Reconstruction, Rehabilitation, SR 60,
    29             South Expressway No.4, Segment 0293 to
    30             Segment 0353 from Business Route 60 to
    20080S1504B2454                 - 15 -     

     1             Airport, Moon Township                     20,000,000
     2             (Base Project Allocation - $20,000,000)
     3         (66)  SR 60, Concrete Pavement
     4             Reconstruction, Rehabilitation, SR 60,
     5             South Expressway No.3, Segment 0292 to
     6             Segment 0352 from Business Route 60 to
     7             Airport, Moon Township                     20,000,000
     8             (Base Project Allocation - $20,000,000)
     9         (67)  SR 60, Concrete Pavement
    10             Reconstruction, Rehabilitation,
    11             Steubenville Pike from Parkway West to
    12             I-79, Robinson Township                     2,750,000
    13             (Base Project Allocation - $2,500,000)
    14             (Design and Contingencies - $250,000)
    15         (68)  SR 60, Concrete Pavement
    16             Reconstruction, Rehabilitation, SR 60
    17             from SR 22 to Business Route 60, Moon,
    18             North Fayette and Robinson Townships        1,162,000
    19             (Base Project Allocation - $1,056,000)
    20             (Design and Contingencies - $106,000)
    21         (69)  SR 65, Upgrade and Coordinate 17
    22             Signals, Safety Improvement, SR 65 from
    23             West End Bridge to Cross Street,
    24             Various Municipalities                        200,000
    25             (Base Project Allocation - $160,000)
    26             (Design and Contingencies - $40,000)
    27         (70)  SR 79, Concrete Patching Restoration,
    28             Interstate Maintenance, SR 79 from
    29             Washington County Line to Bridgeville,
    30             Segment 496 to Segment 525, Bridgeville
    20080S1504B2454                 - 16 -     

     1             Borough and South Fayette Township          1,055,000
     2             (Base Project Allocation - $927,000)
     3             (Design and Contingencies - $128,000)
     4         (71)  SR 79, Concrete Pavement
     5             Reconstruction, Rehabilitation, SR 79
     6             from SR 279 to SR 910, including SR 910
     7             Overhead Deck Replacement, Franklin
     8             Park Borough and Marshall Township          2,228,000
     9             (Base Project Allocation - $2,025,000)
    10             (Design and Contingencies - $203,000)
    11         (72)  SR 79, Concrete Patching Restoration,
    12             Interstate Maintenance, SR 79 from
    13             Campbells Run to Moon Run, Segment 586
    14             to Segment 605, Kennedy and Robinson
    15             Townships                                     885,000
    16             (Base Project Allocation - $800,000)
    17             (Design and Contingencies - $85,000)
    18         (73)  SR 79, Concrete Patching Restoration,
    19             Interstate Maintenance, SR 79 from
    20             Campbells Run to Moon Run, Various
    21             Municipalities                                 97,000
    22             (Base Project Allocation - $97,000)
    23         (74)  SR 791, Concrete Pavement
    24             Reconstruction, Rehabilitation, SR 791,
    25             Rodi Road Phase I, US 22 to Maple Lane,
    26             Churchill Borough                             385,000
    27             (Base Project Allocation - $350,000)
    28             (Design and Contingencies - $35,000)
    29         (75)  SR 791, Concrete Pavement
    30             Reconstruction, Rehabilitation, SR 791,
    20080S1504B2454                 - 17 -     

     1             Rodi Road Phase II, Segment 0021/0000
     2             to Segment 0021/1656, Churchill
     3             Borough                                       330,000
     4             (Base Project Allocation - $300,000)
     5             (Design and Contingencies - $30,000)
     6         (76)  SR 8, Concrete Pavement
     7             Reconstruction, Rehabilitation,
     8             Allegheny River Boulevard, Southbound
     9             from Washington Boulevard to Highland
    10             Park Bridge, City of Pittsburgh               330,000
    11             (Base Project Allocation - $300,000)
    12             (Design and Contingencies - $30,000)
    13         (77)  SR 8, Concrete Pavement
    14             Reconstruction, Rehabilitation,
    15             Allegheny River Boulevard, Northbound
    16             from Washington Boulevard to Highland
    17             Park Bridge, City of Pittsburgh               330,000
    18             (Base Project Allocation - $300,000)
    19             (Design and Contingencies - $30,000)
    20         (78)  SR 8, Corridor Safety Improvements,
    21             Congestion Reduction, Penn Avenue and
    22             Ardmore Boulevard from I-376 to
    23             Braddock Avenue, Hampton, Richland and
    24             Shaler Townships                              175,000
    25             (Base Project Allocation - $125,000)
    26             (Design and Contingencies - $50,000)
    27         (79)  SR 8, Concrete Pavement
    28             Reconstruction, Rehabilitation, Penn
    29             Avenue from South Avenue to Braddock
    30             Avenue, Wilkinsburg Borough                   447,000
    20080S1504B2454                 - 18 -     

     1             (Base Project Allocation - $406,000)
     2             (Design and Contingencies - $41,000)
     3         (80)  SR 837, Slide Correction, Concrete
     4             Rehabilitation, SR 837, Segment 190,
     5             Dravosburg and West Mifflin Boroughs        2,200,000
     6             (Base Project Allocation - $2,000,000)
     7             (Design and Contingencies - $200,000)
     8         (81)  SR 88, Concrete Pavement
     9             Reconstruction, Rehabilitation, Library
    10             Road from Castle Shannon Boulevard to
    11             South Park Road, Bethel Park and Castle
    12             Shannon Boroughs                            2,500,000
    13             (Base Project Allocation - $2,272,000)
    14             (Design and Contingencies - $228,000)
    15         (82)  SR 88, Concrete Pavement
    16             Reconstruction, Rehabilitation, Library
    17             Road from Brownsville and County Line
    18             to South Park Road, Bethel Park Borough
    19             and South Park Township                     3,215,000
    20             (Base Project Allocation - $2,920,000)
    21             (Design and Contingencies - $295,000)
    22         (83)  SR 885, Concrete Pavement
    23             Reconstruction, Rehabilitation, SR 885
    24             from State Street to Beechway, City of
    25             Clairton                                      330,000
    26             (Base Project Allocation - $300,000)
    27             (Design and Contingencies - $30,000)
    28         (84)  SR 885, Concrete Pavement
    29             Reconstruction, Rehabilitation, SR 885
    30             from Clairton Road to Payne Hill Road,
    20080S1504B2454                 - 19 -     

     1             Jefferson Hills Borough                       517,000
     2             (Base Project Allocation - $470,000)
     3             (Design and Contingencies - $47,000)
     4         (85)  SR 910, Construct Left Turn Lanes and
     5             Adjust Traffic Signals, Intersection
     6             Improvement, Wexford Run Road, Left
     7             Turn, Intersection of SR 910 Wexford-
     8             Bayne Road and SR 4053 Wexford Run
     9             Road, Marshall Township                        70,000
    10             (Base Project Allocation - $64,000)
    11             (Design and Contingencies - $6,000)
    12         (86)  SR 910, Concrete Pavement
    13             Reconstruction, Rehabilitation, SR 910,
    14             Wexford-Bayne Road from South Church
    15             Road to Babcock Boulevard, Pine
    16             Township                                    2,669,000
    17             (Base Project Allocation - $2,424,000)
    18             (Design and Contingencies - $245,000)
    19         (87)  SR 910, Pavement Reconstruction,
    20             Rehabilitation, SR 910, Wexford-Bayne
    21             Road from Mingo Road to North Church
    22             Road, Pine Township                         1,736,000
    23             (Base Project Allocation - $1,576,000)
    24             (Design and Contingencies - $160,000)
    25         (88)  SR 978, Pavement Reconstruction,
    26             Rehabilitation, Union Avenue from
    27             Battle Ridge Road to Noblestown Road,
    28             Oakdale Borough and South Fayette
    29             Township                                      339,000
    30             (Base Project Allocation - $308,000)
    20080S1504B2454                 - 20 -     

     1             (Design and Contingencies - $31,000)
     2         (89)  Various Routes, Installation of
     3             Center Line Rumble Strips, Rumble
     4             Strips 2008, Various Municipalities           200,000
     5             (Base Project Allocation - $200,000)
     6         (90)  I-279, Interstate Restoration and
     7             Reconstruction                             19,000,000
     8             (Base Project Allocation - $19,000,000)
     9         (91)  I-376, Interstate Restoration and
    10             Reconstruction                             14,000,000
    11             (Base Project Allocation - $14,000,000)
    12         (92)  I-576, Interstate Restoration and
    13             Reconstruction                              1,200,000
    14             (Base Project Allocation - $1,200,000)
    15         (93)  I-79, Interstate Restoration and
    16             Reconstruction                             27,000,000
    17             (Base Project Allocation - $27,000,000)
    18         (94)  SR 3009, Safety and Intersection
    19             Improvements - Signals Updates,
    20             Widening, Turning Lanes                       775,000
    21             (Base Project Allocation - $775,000)
    22         (95)  SR 28, Prep Work, Safety Improvement,
    23             Divided Relocation, Median Barrier,
    24             Planning, Widen, Alternative Route
    25             Improvements and ITS Systems                  832,000
    26             (Base Project Allocation - $832,000)
    27         (96)  SR 4003, Corridor Safety Improvement
    28             Upgrade and Coordinate Traffic Signals
    29             at Four Locations                               3,000
    30             (Design and Contingencies - $3,000)
    20080S1504B2454                 - 21 -     

     1         (97)  SR 60, Reconstruction, Redesign
     2             Interchange Realignment, Safety
     3             Improvement and Signing                     2,000,000
     4             (Base Project Allocation - $2,000,000)
     5         (98)  SR 8, Widen the Existing Pavement to
     6             Provide Turning Lanes                         156,000
     7             (Base Project Allocation - $156,000)
     8         (99)  SR 48, Extension of Marsh Drive to
     9             Intersect SR 48                               910,000
    10             (Base Project Allocation - $800,000)
    11             (Land Allocation - $100,000)
    12             (Design and Contingencies - $10,000)
    13         (100)  SR 8, IMPROVEMENTS AT INTERSECTION                  <--
    14             WITH DUNCAN AVENUE, INCLUDING WIDENING,
    15             CONSTRUCTION OF TURNING LANES,
    16             REALIGNMENT, ROADWAY DRAINAGE AND
    17             RIGHT-OF-WAY ACQUISITION                    5,501,000
    18             (BASE PROJECT ALLOCATION - $4,394,000)
    19             (LAND ALLOCATION - $1,107,000)
    20  Section 303.  Armstrong County.
    21     Projects are as follows:
    22         (1)  SR 28, New Park and Ride Lot                 113,000
    23             (Base Project Allocation - $102,000)
    24             (Land Allocation - $11,000)
    25         (2)  SR 28, Pavement Reconstruction and
    26             Rehabilitation                              1,380,000
    27             (Base Project Allocation - $1,380,000)
    28         (3)  SR 422, Pavement Reconstruction and
    29             Rehabilitation                                520,000
    30             (Base Project Allocation - $520,000)
    20080S1504B2454                 - 22 -     

     1         (4)  SR 422, Pavement Reconstruction and
     2             Rehabilitation                                140,000
     3             (Base Project Allocation - $140,000)
     4         (5)  SR 422, Restoration and Safety
     5             Improvements                               17,600,000
     6             (Base Project Allocation - $14,400,000)
     7             (Land Allocation - $1,600,000)
     8             (Design and Contingencies - $1,600,000)
     9         (6)  SR 422, MARGARET ROAD INTERSECTION,                   <--
    10             REALIGN 2,500 FEET OF SR 422 NORTH OF
    11             EXISTING INTERSECTION                      19,500,000
    12             (BASE PROJECT ALLOCATION - $17,000,000)
    13             (LAND ALLOCATION - $500,000)
    14             (DESIGN AND CONTINGENCIES - $2,000,000)
    15         (7)  SR 422, WRAY PLAN TO THEATER ROAD,
    16             REALIGNMENT OF APPROXIMATELY 9,100 FEET
    17             OF ROADWAY, FLATTEN VERTICAL PROFILE
    18             AND SITE DISTANCE IMPROVEMENTS              9,500,000
    19             (BASE PROJECT ALLOCATION - $7,500,000)
    20             (LAND ALLOCATION - $1,000,000)
    21             (DESIGN AND CONTINGENCIES - $1,000,000)
    22         (8)  SR 422, ROSEBUD TRUCKING TO CHRYSLER
    23             DEALER, FLATTEN VERTICAL PROFILE AND
    24             SITE DISTANCE IMPROVEMENT                   5,000,000
    25             (BASE PROJECT ALLOCATION - $3,500,000)
    26             (LAND ALLOCATION - $500,000)
    27             (DESIGN AND CONTINGENCIES - $1,000,000)
    28         (9)  SR 422, KITTANNING TOWNSHIP FIRE
    29             DEPARTMENT, FLATTEN VERTICAL PROFILE TO
    30             INCREASE SITE DISTANCE                      2,000,000
    20080S1504B2454                 - 23 -     

     1             (BASE PROJECT ALLOCATION - $1,000,000)
     2             (LAND ALLOCATION - $500,000)
     3             (DESIGN AND CONTINGENCIES - $500,000)
     4         (10)  SR 422, SR 210 TO DUTCH ROAD,
     5             UPGRADES TO INTERSECTION AT DUTCH ROAD,
     6             INSTALLATION OF A WESTBOUND AUXILIARY
     7             LANE                                        6,000,000
     8             (BASE PROJECT ALLOCATION - $4,500,000)
     9             (LAND ALLOCATION - $500,000)
    10             (DESIGN AND CONTINGENCIES - $1,000,000)
    11         (11)  SR 422, SPEED ENFORCEMENT LOCATION: 1
    12             EASTBOUND                                     550,000
    13             (BASE PROJECT ALLOCATION - $250,000)
    14             (LAND ALLOCATION - $50,000)
    15             (DESIGN AND CONTINGENCIES - $250,000)
    16         (12)  SR 422, SPEED ENFORCEMENT LOCATION: 1
    17             WESTBOUND                                     550,000
    18             (BASE PROJECT ALLOCATION - $250,000)
    19             (LAND ALLOCATION - $50,000)
    20             (DESIGN AND CONTINGENCIES - $250,000)
    21         (13)  SR 422, RUPP CHURCH ROAD
    22             INTERSECTION, CUT CREST CURVE TO
    23             IMPROVE SITE DISTANCE                       4,500,000
    24             (BASE PROJECT ALLOCATION - $3,000,000)
    25             (LAND ALLOCATION - $500,000)
    26             (DESIGN AND CONTINGENCIES - $1,000,000)
    27         (14)  SR 422, SILVIS HOLLOW ROAD
    28             INTERSECTION, REALIGN HORIZONTAL AND
    29             VERTICAL CURVES AND CUT BACK SIDE
    30             SLOPES TO IMPROVE SITE DISTANCE             4,500,000
    20080S1504B2454                 - 24 -     

     1             (BASE PROJECT ALLOCATION - $3,000,000)
     2             (LAND ALLOCATION - $500,000)
     3             (DESIGN AND CONTINGENCIES - $1,000,000)
     4         (15)  SR 422, BLANKET HILL ROAD
     5             INTERSECTION, REALIGN HORIZONTAL AND
     6             VERTICAL CURVES AND CUT BACK SIDE
     7             SLOPES TO IMPROVE SITE DISTANCE             4,500,000
     8             (BASE PROJECT ALLOCATION - $3,000,000)
     9             (LAND ALLOCATION - $500,000)
    10             (DESIGN AND CONTINGENCIES - $1,000,000)
    11         (16)  SR 422, SIMPSON CHURCH ROAD
    12             INTERSECTION, REALIGN HORIZONTAL AND
    13             VERTICAL CURVES AND CUT BACK SIDE
    14             SLOPES TO IMPROVE SITE DISTANCE             4,500,000
    15             (BASE PROJECT ALLOCATION - $3,000,000)
    16             (LAND ALLOCATION - $500,000)
    17             (DESIGN AND CONTINGENCIES - $1,000,000)
    18         (17)  SR 422, SANDY FLAT ROAD INTERSECTION,
    19             CUT BACK SIDE SLOPES TO IMPROVE SITE
    20             DISTANCE                                    4,000,000
    21             (BASE PROJECT ALLOCATION - $3,500,000)
    22             (LAND ALLOCATION - $250,000)
    23             (DESIGN AND CONTINGENCIES - $250,000)
    24         (18)  SR 422, BLOSE HOLLOW ROAD
    25             INTERSECTION, CUT BACK SIDE SLOPES TO
    26             IMPROVE SITE DISTANCE                       3,000,000
    27             (BASE PROJECT ALLOCATION - $2,500,000)
    28             (LAND ALLOCATION - $250,000)
    29             (DESIGN AND CONTINGENCIES - $250,000)
    30         (19)  SR 422, FARSTER ROAD INTERSECTION,
    20080S1504B2454                 - 25 -     

     1             REALIGNMENT AND CUT BACK SLOPE TO
     2             IMPROVE SITE DISTANCE                       4,300,000
     3             (BASE PROJECT ALLOCATION - $3,000,000)
     4             (LAND ALLOCATION - $500,000)
     5             (DESIGN AND CONTINGENCIES - $800,000)
     6         (20)  SR 422, GIBSON SCHOOL ROAD
     7             INTERSECTION, MINOR SLOPE CUT BACK TO
     8             IMPROVE SITE DISTANCE                       2,500,000
     9             (BASE PROJECT ALLOCATION - $2,000,000)
    10             (LAND ALLOCATION - $250,000)
    11             (DESIGN AND CONTINGENCIES - $250,000)
    12         (21)  SR 422, COAL BANK ROAD INTERSECTION,
    13             CUT BACK SIDE SLOPES TO IMPROVE SITE
    14             DISTANCE                                    2,500,000
    15             (BASE PROJECT ALLOCATION - $2,000,000)
    16             (LAND ALLOCATION - $250,000)
    17             (DESIGN AND CONTINGENCIES - $250,000)
    18  Section 304.  Beaver County.
    19     Projects are as follows:
    20         (1)  SR 1003, Concrete Pavement
    21             Reconstruction, Rehabilitation, SR
    22             1003, Hillside Avenue to T-65, Elwood
    23             City Borough                                  330,000
    24             (Base Project Allocation - $300,000)
    25             (Design and Contingencies - $30,000)
    26         (2)  SR 1003, Concrete Rehabilitation,
    27             Reconstruct and Bituminous Overlay,
    28             Brighton Road from Cherry Hill Road to
    29             Hillside Avenue, Elwood City Borough
    30             and North Sewickley Township                  234,000
    20080S1504B2454                 - 26 -     

     1             (Base Project Allocation - $234,000)
     2         (3)  SR 1003, Concrete Pavement
     3             Reconstruction, Rehabilitation,
     4             Brighton Road from Route 65 to SR 1002
     5             and Cherry Hill Road, North Sewickley
     6             Township                                      701,000
     7             (Base Project Allocation - $637,000)
     8             (Design and Contingencies - $64,000)
     9         (4)  SR 1021, Concrete Rehabilitation,
    10             Reconstruct, Pine Run Road from SR 1015
    11             to Route 588, Marion Township                 560,000
    12             (Base Project Allocation - $560,000)
    13         (5)  SR 1024, Concrete Rehabilitation,
    14             Reconstruct and Bituminous Overlay,
    15             Deer Lane Extension from Virginia
    16             Avenue to Big Knob Road, New Sewickley
    17             and Rochester Townships                       943,000
    18             (Base Project Allocation - $943,000)
    19         (6)  SR 1039, Concrete Rehabilitation,
    20             Reconstruct and Bituminous Overlay,
    21             Virginia Avenue and Rochester Road from
    22             SR 68 to Sunflower Road, Pulaski and
    23             Rochester Townships                           364,000
    24             (Base Project Allocation - $364,000)
    25         (7)  SR 151, Concrete Rehabilitation,
    26             Reconstruct and Bituminous Overlay,
    27             Bocktown Road from Route 30 to Thompson
    28             Hill Road, Greene, Hanover,
    29             Independence and Raccoon Townships          2,260,000
    30             (Base Project Allocation - $2,210,000)
    20080S1504B2454                 - 27 -     

     1             (Design and Contingencies - $50,000)
     2         (8)  SR 151, Concrete Rehabilitation,
     3             Reconstruct and Bituminous Overlay,
     4             Bocktown Road from Thompson Hill Road
     5             to Route 60 Interchange, Hopewell and
     6             Independence Townships                      1,089,000
     7             (Base Project Allocation - $1,089,000)
     8         (9)  SR 168, Concrete Pavement
     9             Reconstruction, Rehabilitation,
    10             Hookstown and Frankfurt Road from
    11             Temple Road to Route 30, Greene
    12             Township                                      571,000
    13             (Base Project Allocation - $519,000)
    14             (Design and Contingencies - $52,000)
    15         (10)  SR 18, Concrete Rehabilitation,
    16             Reconstruct and Bituminous Overlay,
    17             Main Street from Washington County Line
    18             to Traverse Creek, Frankfort Springs
    19             Borough and Hanover Township                  699,000
    20             (Base Project Allocation - $699,000)
    21         (11)  SR 18, Concrete Rehabilitation,
    22             Reconstruct and Bituminous Overlay,
    23             Frankfort Road from Century Farm Road
    24             to Hanover Kendall Road, Hanover
    25             Township                                      192,000
    26             (Base Project Allocation - $192,000)
    27         (12)  SR 18, Concrete Rehabilitation,
    28             Reconstruct and Bituminous Overlay,
    29             Frankfort Road from Newer Pavement to
    30             Service Creek Road, Hanover and Raccoon
    20080S1504B2454                 - 28 -     

     1             Townships                                     628,000
     2             (Base Project Allocation - $628,000)
     3         (13)  SR 2001, Concrete Rehabilitation,
     4             Reconstruct, Eastbound Duss Avenue from
     5             Twenty-fourth Street to Legionville
     6             Road, Harmony Township                        816,000
     7             (Base Project Allocation - $816,000)
     8         (14)  SR 2001, Concrete Rehabilitation,
     9             Reconstruct, Westbound Duss Avenue from
    10             Twenty-fourth Street to Legionville
    11             Road, Harmony Township                        816,000
    12             (Base Project Allocation - $816,000)
    13         (15)  SR 2004, Concrete Pavement
    14             Reconstruction, Rehabilitation, Ninth
    15             Street from Third Avenue to Freedom-
    16             Crider Road, Freedom Borough and North
    17             Sewickley Township                            386,000
    18             (Base Project Allocation - $351,000)
    19             (Design and Contingencies - $35,000)
    20         (16)  SR 2004, Realignment and Roadway
    21             Reconstruction, Safety Improvement,
    22             Freedom Road from SR 65 to Park Quarry
    23             Road Upgrade, Phase A, New Sewickley
    24             Township                                    4,400,000
    25             (Base Project Allocation - $4,400,000)
    26         (17)  SR 2004, Slides Correction Concrete
    27             Rehabilitation, Reconstruction, Lovi
    28             Road, SR 2004, Segment 0040 to Segment
    29             0050, New Sewickley Township                  930,000
    30             (Base Project Allocation - $850,000)
    20080S1504B2454                 - 29 -     

     1             (Land Allocation - $30,000)
     2             (Design and Contingencies - $50,000)
     3         (18)  SR 2005, Concrete Pavement
     4             Reconstruction, Rehabilitation, Conway
     5             Wallrose Road from Big Sewickley Creek
     6             Road to Pfaff Road, Economy Borough         2,200,000
     7             (Base Project Allocation - $2,000,000)
     8             (Design and Contingencies - $200,000)
     9         (19)  SR 2005, Concrete Pavement
    10             Reconstruction, Rehabilitation, Conway
    11             Wallrose Road from Ridge Road Extension
    12             to Pfaff Road, Economy Borough                528,000
    13             (Base Project Allocation - $480,000)
    14             (Design and Contingencies - $48,000)
    15         (20)  SR 2006, Concrete Pavement
    16             Reconstruction, Rehabilitation, Golden
    17             Grove Road from SR 4052 to Locust
    18             Street, Economy Borough                       598,000
    19             (Base Project Allocation - $543,000)
    20             (Design and Contingencies - $55,000)
    21         (21)  SR 30, Concrete Pavement
    22             Reconstruction, Rehabilitation, Lincoln
    23             Highway from West Virginia Line to Past
    24             Red Dog Road, Greene Township                 330,000
    25             (Base Project Allocation - $300,000)
    26             (Design and Contingencies - $30,000)
    27         (22)  SR 3005, Concrete Rehabilitation,
    28             Reconstruct and Bituminous Overlay,
    29             Chapel Road from Brodhead Road to
    30             Frankfort Road, City of Aliquippa and
    20080S1504B2454                 - 30 -     

     1             Center and Hopewell Townships               1,667,000
     2             (Base Project Allocation - $1,667,000)
     3         (23)  SR 3012, Concrete Rehabilitation,
     4             Reconstruct and Bituminous Overlay,
     5             Center Grange Road from Brodhead Road
     6             to Monaca Road, Center Township               904,000
     7             (Base Project Allocation - $904,000)
     8         (24)  SR 3014, Concrete Rehabilitation,
     9             Reconstruct and Bituminous Overlay,
    10             Golf Course Road from Mill Street to
    11             Dead End, City of Aliquippa and Center
    12             and Hopewell Townships                        439,000
    13             (Base Project Allocation - $439,000)
    14         (25)  SR 3016, Concrete Rehabilitation,
    15             Reconstruct and Bituminous Overlay,
    16             Green Garden Road from Frankfort Road
    17             to Clearview Road, Raccoon Township         1,030,000
    18             (Base Project Allocation - $1,030,000)
    19         (26)  SR 3036, Concrete Rehabilitation,
    20             Reconstruct and Bituminous Overlay,
    21             Gringo and Independence Road from
    22             Bocktown Road to Independence Road,
    23             Hopewell and Independence Townships           605,000
    24             (Base Project Allocation - $605,000)
    25         (27)  SR 351, Concrete Rehabilitation,
    26             Reconstruct and Bituminous Overlay,
    27             Fairland Boulevard from SR 18 to SR
    28             168, Big Beaver, Koppel and New Galilee
    29             Boroughs                                    1,505,000
    30             (Base Project Allocation - $1,417,000)
    20080S1504B2454                 - 31 -     

     1             (Land Allocation - $8,000)
     2             (Design and Contingencies - $80,000)
     3         (28)  SR 4002, Concrete Rehabilitation,
     4             Reconstruct and Bituminous Overlay,
     5             Little Bower and Ander from Route 51 to
     6             Lawrence County Line, Darlington
     7             Township                                      923,000
     8             (Base Project Allocation - $923,000)
     9         (29)  SR 4008, Concrete Pavement
    10             Reconstruction, Rehabilitation, Braun
    11             Road from Shenango Road to Route 51,
    12             Chippewa and Patterson Townships              598,000
    13             (Base Project Allocation - $543,000)
    14             (Design and Contingencies - $55,000)
    15         (30)  SR 4011, Concrete Rehabilitation,
    16             Reconstruct and Bituminous Overlay,
    17             Elmbrook Road from SR 251 to McClain
    18             Road, South Beaver Township                   468,000
    19             (Base Project Allocation - $468,000)
    20         (31)  SR 4016, Concrete Pavement
    21             Reconstruction, Rehabilitation, Beaner
    22             Hollow Road from Dutch Ridge Road to
    23             Riverside Drive, Bridgewater Borough
    24             and Brighton Township                         501,000
    25             (Base Project Allocation - $455,000)
    26             (Design and Contingencies - $46,000)
    27         (32)  SR 4019, Concrete Rehabilitation,
    28             Reconstruct and Bituminous Overlay,
    29             Park Road from Brady's Run Road to
    30             Blackhawk Road, Brighton and Chippewa
    20080S1504B2454                 - 32 -     

     1             Townships                                   1,121,000
     2             (Base Project Allocation - $1,121,000)
     3         (33)  SR 4020, Concrete Rehabilitation,
     4             Reconstruct and Bituminous Overlay,
     5             Dutch Ridge Road from Tuscawaras Road
     6             to Park Road, Brighton Township               910,000
     7             (Base Project Allocation - $910,000)
     8         (34)  SR 4021, Concrete Rehabilitation,
     9             Reconstruct and Bituminous Overlay,
    10             Shenango Road from Braun Road to
    11             Darlington Road, Chippewa Township            455,000
    12             (Base Project Allocation - $455,000)
    13         (35)  SR 4028, Concrete Rehabilitation,
    14             Reconstruct and Bituminous Overlay,
    15             Tuscawaras Road from Fairview Road to
    16             Georgetown Lane, Ohioville Borough,
    17             Brighton and Vanport Townships              3,250,000
    18             (Base Project Allocation - $3,250,000)
    19         (36)  SR 4045, Concrete Pavement
    20             Reconstruction, Rehabilitation, Murphy
    21             Hill Road from Midland Avenue to
    22             Sunrise Drive, Industry and Midland
    23             Boroughs                                      330,000
    24             (Base Project Allocation - $300,000)
    25             (Design and Contingencies - $30,000)
    26         (37)  SR 51, Concrete Pavement
    27             Reconstruction, Rehabilitation, Penna
    28             Avenue Eastbound from SR 251 to SR 168,
    29             Chippewa and South Beaver Townships         3,300,000
    30             (Base Project Allocation - $3,000,000)
    20080S1504B2454                 - 33 -     

     1             (Design and Contingencies - $300,000)
     2         (38)  SR 51, Concrete Pavement
     3             Reconstruction, Rehabilitation, Penna
     4             Avenue Westbound from SR 251 to SR 168,
     5             Chippewa and South Beaver Townships         3,300,000
     6             (Base Project Allocation - $3,000,000)
     7             (Design and Contingencies - $300,000)
     8         (39)  SR 51, Concrete Pavement
     9             Reconstruction, Rehabilitation, Penna
    10             Avenue from SR 168 to Taggert Road,
    11             Chippewa, Darlington and South Beaver
    12             Townships                                   4,950,000
    13             (Base Project Allocation - $4,500,000)
    14             (Design and Contingencies - $450,000)
    15         (40)  SR 51, Concrete Pavement
    16             Reconstruction, Rehabilitation, Penna
    17             Avenue Westbound from SR 168 to Taggert
    18             Road, Chippewa, Darlington and South
    19             Beaver Townships                            4,950,000
    20             (Base Project Allocation - $4,500,000)
    21             (Design and Contingencies - $450,000)
    22         (41)  SR 60, Concrete Rehabilitation,
    23             Reconstruction, SR 60 from Chippewa to
    24             Vanport, Brighton, Chippewa and Vanport
    25             Townships                                   3,851,000
    26             (Base Project Allocation - $3,426,000)
    27             (Design and Contingencies - $425,000
    28         (42)  SR 60, Concrete Rehabilitation,
    29             Reconstruction, SR 60 from Vanport to
    30             Center Township, Center, Potter and
    20080S1504B2454                 - 34 -     

     1             Vanport Townships                           2,035,000
     2             (Base Project Allocation - $1,850,000)
     3             (Design and Contingencies - $185,000)
     4         (43)  SR 60, Concrete Rehabilitation,
     5             Reconstruction, SR 60, I-376, Part 6,
     6             Northbound Segment 0030 to Segment 0010
     7             and Southbound Segment 0031 to Segment
     8             0011, Hopewell and Independence
     9             Townships                                   1,353,000
    10             (Base Project Allocation - $1,230,000)
    11             (Design and Contingencies - $123,000)
    12         (44)  SR 60, Reconstruction, Interchanges,
    13             Safety Features and Crossovers
    14             Upgrades, SR 60, Allegheny County Line
    15             to SR 60 Toll Road, Various
    16             Municipalities                             16,500,000
    17             (Base Project Allocation - $15,000,000)
    18             (Design and Contingencies - $1,500,000)
    19         (45)  SR 65, Safety Improvement, SR 65 from
    20             Baden to Rochester, Baden Borough             193,000
    21             (Base Project Allocation - $175,000)
    22             (Design and Contingencies - $18,000)
    23         (46)  SR 65, Concrete Pavement
    24             Reconstruction, Rehabilitation, SR 65
    25             Northbound, French Point Bridge to
    26             Tevebaugh Road, Baden and Economy
    27             Boroughs and Harmony Township               2,309,000
    28             (Base Project Allocation - $2,280,000)
    29             (Design and Contingencies - $29,000)
    30         (47)  SR 65, Concrete Pavement
    20080S1504B2454                 - 35 -     

     1             Reconstruction, Rehabilitation, SR 65
     2             Southbound, French Point Bridge to
     3             Tevebaugh Road, Baden and Economy
     4             Boroughs and Harmony Township               2,563,000
     5             (Base Project Allocation - $2,328,000)
     6             (Design and Contingencies - $235,000)
     7         (48)  SR 65, Concrete Pavement
     8             Reconstruction, Rehabilitation, Mercer
     9             Road from Fifth Avenue to Fourth
    10             Street, New Brighton Borough                  330,000
    11             (Base Project Allocation - $300,000)
    12             (Design and Contingencies - $30,000)
    13         (49)  SR 68, Concrete Rehabilitation,
    14             Reconstruct and Bituminous Overlay, SR
    15             68 from SR 1039 to New Pavement,
    16             Daugherty, New Sewickley and Rochester
    17             Townships                                   1,261,000
    18             (Base Project Allocation - $1,261,000)
    19         (50)  SR 68, Concrete Rehabilitation,
    20             Reconstruct and Bituminous Overlay, SR
    21             68 from Wolfes Run Road to Kinder
    22             Morgan Terminals, Industry Borough            163,000
    23             (Base Project Allocation - $163,000)
    24         (51)  SR 68, Concrete Rehabilitation,
    25             Concrete Pavement Reconstruction,
    26             Rehabilitation, 68 Montrose Drive to
    27             Butler County Line, Marion and New
    28             Sewickley Townships                           580,000
    29             (Base Project Allocation - $513,000)
    30             (Land Allocation - $3,000)
    20080S1504B2454                 - 36 -     

     1             (Design and Contingencies - $64,000)
     2         (52)  SR 68, Concrete Pavement
     3             Reconstruction, Rehabilitation,
     4             Virginia Avenue from SR 1024 to SR
     5             1039, Rochester Borough and Rochester
     6             Township                                      330,000
     7             (Base Project Allocation - $300,000)
     8             (Design and Contingencies - $30,000)
     9         (53)  Various, Retaining Walls and Slide
    10             Corrections                                    80,000
    11             (Land Allocation - $80,000)
    12  Section 305.  Bedford County.
    13     Projects are as follows:
    14         (1)  SR 70, Restoration, Rehabilitation,
    15             Safety Improvements, I-70, Breezewood
    16             to Fulton County Line, East Providence
    17             Township                                      850,000
    18             (Base Project Allocation - $850,000)
    19         (2)  I-70, Interstate Restoration and
    20             Reconstruction                              3,500,000
    21             (Base Project Allocation - $3,500,000)
    22         (3)  I-99, Interstate Restoration and
    23             Reconstruction                             14,000,000
    24             (Base Project Allocation - $14,000,000)
    25         (4)  SR 26, Intersection Improvement,
    26             Safety Improvement                            845,000
    27             (Base Project Allocation - $700,000)
    28             (Land Allocation - $100,000)
    29             (Design and Contingencies - $45,000)
    30         (5)  SR 4009, Widen, Resurface and
    20080S1504B2454                 - 37 -     

     1             Intersection Improvements,
     2             Signalization                                 465,000
     3             (Base Project Allocation - $465,000)
     4         (6)  SR 1007, Concrete Pavement Restoration
     5             and Overlay                                 6,600,000
     6             (Base Project Allocation - $6,600,000)
     7         (7)  SR 220, Overlay and Shoulder Upgrade       1,526,000
     8             (Base Project Allocation - $1,526,000)
     9         (8)  SR 30, Concrete Pavement Restoration
    10             and Overlay                                   769,000
    11             (Base Project Allocation - $769,000)
    12         (9)  SR 30, Concrete Pavement Restoration
    13             and Overlay and Upgrade Drainage            4,900,000
    14             (Design and Contingencies - $4,900,000
    15         (10)  SR 56, Concrete Pavement Restoration
    16             and Overlay                                 2,250,000
    17             (Base Project Allocation - $2,250,000)
    18  Section 306.  Berks County.
    19     Projects are as follows:
    20         (1)  SR 1010, Intersection Signalization,
    21             SR 1010 and Dries Road Intersection,
    22             Ontelaunee Township                           200,000
    23             (Base Project Allocation - $50,000)
    24             (Design and Contingencies - $150,000)
    25         (2)  SR 1021, Safety Improvement, Tree
    26             Cutting, Excavating and Shoulder Work,
    27             SR 1021 and SR 1024, Long Lane
    28             Intersection, Maxatawny Township              325,000
    29             (Base Project Allocation - $75,000)
    30             (Design and Contingencies - $250,000)
    20080S1504B2454                 - 38 -     

     1         (3)  SR 12, Excavating, Embankment,
     2             Shoulders, Guide Rail and Utility
     3             Poles, SR 12, Safety Improvements,
     4             Alsace Township                               600,000
     5             (Base Project Allocation - $100,000)
     6             (Design and Contingencies - $500,000)
     7         (4)  SR 222, Highway Reconstruction, SR
     8             222, North Corridor Phase I,
     9             Maidencreek, Ontelaunee and Richmond
    10             Townships                                  36,600,000
    11             (Base Project Allocation - $30,600,000)
    12             (Land Allocation - $2,800,000)
    13             (Design and Contingencies - $3,200,000)
    14         (5)  SR 222, Install Closed Circuit
    15             Television Cameras, Route 222, Nonurban
    16             Area, Various Municipalities                1,124,000
    17             (Base Project Allocation - $254,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $850,000)
    20         (6)  SR 222 and SR 422, Installation of
    21             Dynamic Message Signs, SR 222 and SR
    22             422, Nonurban Area, Various
    23             Municipalities                                410,000
    24             (Base Project Allocation - $250,000)
    25             (Land Allocation - $15,000)
    26             (Design and Contingencies - $145,000)
    27         (7)  SR 222 and SR 422, Installation of
    28             Variable Message Signs and Closed
    29             Circuit Television Cameras, SR 222 and
    30             SR 422 Urban Area, Various
    20080S1504B2454                 - 39 -     

     1             Municipalities                                390,000
     2             (Base Project Allocation - $225,000)
     3             (Land Allocation - $15,000)
     4             (Design and Contingencies - $150,000)
     5         (8)  SR 3008, Intersection Improvement and
     6             Curve Safety Improvements, SR 3008,
     7             Segment 50 to Segment 60, Lower
     8             Heidelberg and North Heidelberg
     9             Townships                                     300,000
    10             (Base Project Allocation - $75,000)
    11             (Design and Contingencies - $225,000)
    12         (9)  SR 3023, Curve Safety Improvements, SR
    13             3023, Vicinity of Evans Hill Road and
    14             Sweitzer Road, Lower Heidelberg
    15             Township                                      300,000
    16             (Base Project Allocation - $75,000)
    17             (Design and Contingencies - $225,000)
    18         (10)  SR 422, Congestion Reduction, Safety
    19             Improvements, Penn Avenue, SR 422
    20             Corridor, Robesonia, Sinking Spring and
    21             Wernersville Boroughs, Heidelberg,
    22             Lower Heidelberg and South Heidelberg
    23             Townships                                     360,000
    24             (Base Project Allocation - $285,000)
    25             (Land Allocation - $15,000)
    26             (Design and Contingencies - $60,000)
    27         (11)  SR 562, Intersection Improvement,
    28             Congestion Mitigation, SR 562,
    29             Intersection of Shelbourne Road,
    30             Boyertown Pike and Oley Turnpike Road,
    20080S1504B2454                 - 40 -     

     1             Exeter and Oley Townships                     400,000
     2             (Base Project Allocation - $100,000)
     3             (Land Allocation - $40,000)
     4             (Design and Contingencies - $260,000)
     5         (12)  SR 78, Replacement of Precast
     6             Parapets, RATS Precast Parapets,
     7             Greenwich Township                            475,000
     8             (Base Project Allocation - $20,000)
     9             (Design and Contingencies - $455,000)
    10         (13)  SR 78, Safety Gates, SR 78 Corridor,
    11             Various Municipalities                        525,000
    12             (Base Project Allocation - $525,000)
    13         (14)  SR 78, Installation of Closed Circuit
    14             Television Cameras, Highway Advisory
    15             Radio, Changeable Message Signs, I-78
    16             Corridor and SR 61 into I-78
    17             Intersection, Various Municipalities          490,000
    18             (Base Project Allocation - $360,000)
    19             (Land Allocation - $15,000)
    20             (Design and Contingencies - $115,000)
    21         (15)  SR 78, Install Tenth Mile Location
    22             Markers, Safety Improvement, I-78
    23             Corridor, Various Municipalities              102,000
    24             (Base Project Allocation - $7,000)
    25             (Design and Contingencies - $95,000)
    26         (16)  I-176, Interstate Restoration and
    27             Reconstruction                             11,100,000
    28             (Base Project Allocation - $11,100,000)
    29         (17)  I-78, Interstate Restoration and
    30             Reconstruction                             38,500,000
    20080S1504B2454                 - 41 -     

     1             (Base Project Allocation - $38,500,000)
     2         (18)  SR 183, Intersection Improvement            268,000
     3             (Base Project Allocation - $111,000)
     4             (Land Allocation - $52,000)
     5             (Design and Contingencies - $105,000)
     6         (19)  SR 82, Highway Restoration                1,500,000
     7             (Base Project Allocation - $1,500,000)
     8         (20)  SOUTH 9TH STREET EXTENSION, NEW                      <--
     9             CONSTRUCTION AND INTERSECTION, 1.5
    10             MILES, SR 0422 TO LAUREL STREET, CITY
    11             OF READING, CUMRU TOWNSHIP AND EXETER
    12             TOWNSHIP                                   61,250,000
    13             (BASE PROJECT ALLOCATION - $46,250,000)
    14             (LAND ALLOCATION - $11,000,000)
    15             (DESIGN AND CONTINGENCIES - $4,000,000)
    16  Section 307.  Blair County.
    17     Projects are as follows:
    18         (1)  SR 1001, Widen, Add Lane, Pleasant
    19             Valley Boulevard, City of Altoona             264,000
    20             (Base Project Allocation - $192,500)
    21             (Land Allocation - $11,500)
    22             (Design and Contingencies - $60,000)
    23         (2)  SR 1008, Park and Ride Lot, Antis
    24             Township Park and Ride, Adjacent to
    25             PennDOT Stockpile, Antis Township             118,000
    26             (Base Project Allocation - $93,000)
    27             (Design and Contingencies - $25,000)
    28         (3)  SR 1012, Park and Ride Lot, Tenth
    29             Street Park and Ride, Under Bridge at
    30             SR 99, Tyrone Borough, Snyder Township        478,000
    20080S1504B2454                 - 42 -     

     1             (Base Project Allocation - $253,000)
     2             (Land Allocation - $25,000)
     3             (Design and Contingencies - $200,000)
     4         (4)  SR 3013, Construct Center Turn Lane,
     5             Dunnings Highway Corridor, Pine Run to
     6             South of Walnut Street Intersection,
     7             Greenfield Township                           489,000
     8             (Base Project Allocation - $400,000)
     9             (Land Allocation - $11,000)
    10             (Design and Contingencies - $78,000)
    11         (5)  SR 36, Increase Clearance beneath I-
    12             99, PA 36 under I-99, Logan Township
    13             and City of Altoona                           300,000
    14             (Base Project Allocation - $300,000)
    15         (6)  SR 4019, Safety Improvement
    16             Relocation, Realignment, Pinecroft
    17             Curves, Antis Township                      1,740,000
    18             (Base Project Allocation - $1,620,000)
    19             (Design and Contingencies - $120,000)
    20         (7)  SR 8004, Ramps, Restoration,
    21             Rehabilitation, Safety Improvements, I-
    22             99, US 22 and PA 764 Interchanges,
    23             Allegheny Township                            400,000
    24             (Base Project Allocation - $400,000)
    25         (8)  SR 8023, Pavement Restoration, Safety
    26             Improvements, I-99, Blair County Ramps,
    27             Allegheny, Antis, Freedom, Greenfield,
    28             Logan and Snyder Townships                    500,000
    29             (Base Project Allocation - $500,000)
    30         (9)  SR 99, Restoration, Rehabilitation,
    20080S1504B2454                 - 43 -     

     1             Safety Improvements, I-99, Plank Road
     2             to Frankstown Road, Logan Township and
     3             City of Altoona                               480,000
     4             (Base Project Allocation - $480,000)
     5         (10)  SR 99, Pavement Restoration and
     6             Rehabilitation, I-99, Sproul-Newry
     7             Pull-Off, Milepost 17 to East Freedom
     8             Interchange, Freedom and Greenfield
     9             Townships                                   1,750,000
    10             (Base Project Allocation - $1,750,000)
    11         (11)  I-99, Interstate Restoration and
    12             Reconstruction                             37,110,000
    13             (Base Project Allocation - $37,110,000)
    14         (12)  SR 1021, New Roadway, Interchange
    15             Improvement                                   745,000
    16             (Land Allocation - $20,000)
    17             (Design and Contingencies - $725,000)
    18         (13)  SR 22, Concrete Rehabilitation,
    19             Guiderail and Drainage Improvements         2,133,000
    20             (Base Project Allocation - $2,133,000)
    21         (14)  SR 22, Add Lane                             100,000
    22             (Land Allocation - $100,000)
    23         (15)  SR 866, Highway Rehabilitation,
    24             Resurfacing, Shoulder Improvement             400,000
    25             (Base Project Allocation - $400,000)
    26         (16)  SR 350, Concrete Pavement Restoration
    27             and Overlay                                 2,500,000
    28             (Base Project Allocation - $2,500,000)
    29         (17)  SR 36, Concrete Pavement Restoration
    30             and Overlay                                 2,825,000
    20080S1504B2454                 - 44 -     

     1             (Base Project Allocation - $2,825,000)
     2         (18)  SR 36, Replace Existing Metal Arch
     3             Pipe with a Box Culvert                       950,000
     4             (Base Project Allocation - $950,000)
     5         (19)  SR 4013, Phase I, Intersection
     6             Improvement and Widening                    1,500,000
     7             (Design and Contingencies - $1,500,000)
     8         (20)  SR 4017, Concrete Pavement
     9             Restoration and Overlay                     2,165,000
    10             (Base Project Allocation - $2,165,000)
    11         (21)  SR 453, Concrete Pavement Restoration
    12             and Overlay                                 1,350,000
    13             (Base Project Allocation - $1,350,000)
    14         (22)  SR 764, Concrete Pavement Restoration
    15             and Overlay                                 1,900,000
    16             (Base Project Allocation - $1,900,000)
    17  Section 308.  Bradford County.
    18     Projects are as follows:
    19         (1)  SR 1043, Slide Repairs, Sheshequin
    20             Slides, SR 1043, Segment 0220 to
    21             Segment 0230, Athens and Sheshequin
    22             Townships                                   2,040,000
    23             (Base Project Allocation - $1,780,000)
    24             (Land Allocation - $40,000)
    25             (Design and Contingencies - $220,000)
    26         (2)  SR 220, Safety Improvement, Tracy Road
    27             to T-624, Albany Township                     113,000
    28             (Base Project Allocation - $80,000)
    29             (Land Allocation - $6,000)
    30             (Design and Contingencies - $27,000)
    20080S1504B2454                 - 45 -     

     1         (3)  SR 467, Slide Repairs, SR 467, Segment
     2             20 and Segment 180, Pike and Rome
     3             Townships                                     980,000
     4             (Base Project Allocation - $840,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $120,000)
     7         (4)  SR 6, Safety Improvement and
     8             Resurface, Tracy Road to T-624,
     9             Standing Stone Township                       440,000
    10             (Base Project Allocation - $400,000)
    11             (Design and Contingencies - $40,000)
    12         (5)  SR 6, Intersection Improvement, SR 6
    13             and SR 2010 Intersection, Wyalusing
    14             Township                                      975,000
    15             (Base Project Allocation - $975,000)
    16         (6)  SR 220, Resurfacing, Restoration           2,890,000
    17             (Base Project Allocation - $2,850,000)
    18             (Land Allocation - $40,000)
    19         (7)  SR 220, Resurfacing, Restoration             630,000
    20             (Base Project Allocation - $600,000)
    21             (Land Allocation - $30,000)
    22         (8)  SR 220, Highway Restoration                4,570,000
    23             (Base Project Allocation - $4,500,000)
    24             (Land Allocation - $40,000)
    25             (Design and Contingencies - $30,000)
    26         (9)  SR 3016, Resurfacing, Restoration            509,000
    27             (Base Project Allocation - $484,000)
    28             (Land Allocation - $25,000)
    29         (10)  SR 4024, Resurfacing, Restoration         1,510,000
    30             (Base Project Allocation - $1,500,000)
    20080S1504B2454                 - 46 -     

     1             (Land Allocation - $10,000)
     2         (11)  SR 4031, Resurfacing, Restoration         1,254,000
     3             (Base Project Allocation - $1,200,000)
     4             (Land Allocation - $54,000)
     5         (12)  SR 4039, Resurfacing, Restoration         2,286,000
     6             (Base Project Allocation - $2,180,000)
     7             (Land Allocation - $106,000)
     8  Section 309.  Bucks County.
     9     Projects are as follows:
    10         (1)  SR 202, Relocation, Realignment, US
    11             202, Pickertown Road to PA 611,
    12             Doylestown Township                        87,058,000
    13             (Base Project Allocation - $49,600,000)
    14             (Land Allocation - $19,943,000)
    15             (Design and Contingencies -
    16             $17,515,000)
    17         (2)  SR 202, Wetland Replacement
    18             Environmental Mitigation, US 202,
    19             Section 700 Wetland Mitigation, New
    20             Britain Township                           16,070,000
    21             (Base Project Allocation - $5,600,000)
    22             (Land Allocation - $1,850,000)
    23             (Design and Contingencies - $8,620,000)
    24         (3)  Bridgetown Interconnect Project,
    25             including certain interconnection, new
    26             signals and widening, Lower Southampton
    27             Township                                    3,210,000
    28             (Base Project Allocation - $3,210,000)
    29         (4)  I-95, Interstate Restoration and
    30             Reconstruction                             18,000,000
    20080S1504B2454                 - 47 -     

     1             (Base Project Allocation - $18,000,000)
     2         (5)  SR 2018, Intersection Improvement,
     3             Widen and Provide Left Lane                   600,000
     4             (Base Project Allocation - $600,000)
     5         (6)  SR 202, Intersection Improvement, to
     6             Include Left Turn Lane                        230,000
     7             (Land Allocation - $100,000)
     8             (Design and Contingencies - $130,000)
     9         (7)  SR 2029, Intersection Improvement, Add
    10             Turn Lanes                                  2,000,000
    11             (Base Project Allocation - $2,000,000)
    12         (8)  SR 2033, Widen, Additional Lanes             485,000
    13             (Base Project Allocation - $485,000)
    14         (9)  SR 2038, Widen, Additional Lanes           4,000,000
    15             (Base Project Allocation - $4,000,000)
    16         (10)  SR 2038, Widen From Two to Four Lanes
    17             With Turning Lanes, Associated
    18             Improvements, Signal Upgrade                2,309,000
    19             (Base Project Allocation - $1,369,000)
    20             (Land Allocation - $120,000)
    21             (Design and Contingencies - $820,000)
    22         (11)  SR 4033, Reconstruct - Including
    23             Curbs, Sidewalks and Drainage               1,400,000
    24             (Base Project Allocation - $1,400,000)
    25  Section 310.  Butler County.
    26     Projects are as follows:
    27         (1)  SR 228, Additional Lanes, Realignment,
    28             Simon Properties Project, PA 228 from
    29             SR 3020, Freedom Road, to SR 3021,
    30             Franklin Road, Cranberry Township          19,750,000
    20080S1504B2454                 - 48 -     

     1             (Base Project Allocation - $16,080,000)
     2             (Land Allocation - $3,470,000)
     3             (Design and Contingencies - $200,000)
     4         (2)  SR 488, Park and Ride Lot Expansion,
     5             I-79 at PA 488, Park-N-Ride,
     6             Portersville Borough                           83,000
     7             (Base Project Allocation - $77,000)
     8             (Design and Contingencies - $6,000)
     9         (3)  SR 79, Restoration, I-79, Allegheny
    10             County Line to SR 3025 Interchange,
    11             Cranberry and Jackson Townships               675,000
    12             (Base Project Allocation - $650,000)
    13             (Design and Contingencies - $25,000)
    14         (4)  SR 79, Restoration, I-79, SR 3025
    15             Interchange to PA 488 Interchange,
    16             Jackson, Lancaster and Muddycreek
    17             Townships                                     675,000
    18             (Base Project Allocation - $650,000)
    19             (Design and Contingencies - $25,000)
    20         (5)  SR 79, Restoration, I-79, PA 488
    21             Interchange to Lawrence County Line,
    22             Muddycreek and Worth Townships                675,000
    23             (Base Project Allocation - $650,000)
    24             (Design and Contingencies - $25,000)
    25         (6)  I-79, Interstate Restoration and
    26             Reconstruction                             26,800,000
    27             (Base Project Allocation - $26,800,000)
    28         (7)  I-80, Interstate Restoration and
    29             Reconstruction                              1,700,000
    30             (Base Project Allocation - $1,700,000)
    20080S1504B2454                 - 49 -     

     1         (8)  SR 422, Pavement Reconstruction and
     2             Rehabilitation                                260,000
     3             (Base Project Allocation - $260,000)
     4         (9)  SR 422, Pavement Reconstruction and
     5             Rehabilitation                                260,000
     6             (Base Project Allocation - $260,000)
     7         (10)  SR 422, Pavement Reconstruction and
     8             Rehabilitation                              1,320,000
     9             (Base Project Allocation - $1,320,000)
    10         (11)  SR 422, Pavement Reconstruction and
    11             Rehabilitation                                840,000
    12             (Base Project Allocation - $840,000)
    13  Section 311.  Cambria County.
    14     Projects are as follows:
    15         (1)  SR 1021, Roadway Realignment, Safety
    16             Improvement, Preloh Hill Curve
    17             beginning at the Intersection with
    18             Stoltz Road, T-523, and Continues East
    19             0.5 Mile, Clearfield Township                 255,000
    20             (Base Project Allocation - $185,000)
    21             (Land Allocation - $19,000)
    22             (Design and Contingencies - $51,000)
    23         (2)  SR 22, Highway Reconstruction,
    24             Concrete Rehabilitation, Mundys Corner
    25             to T-418, Cambria and Jackson
    26             Townships                                   3,550,000
    27             (Base Project Allocation - $3,400,000)
    28             (Design and Contingencies - $150,000)
    29         (3)  SR 3007, Traffic Studies Safety
    30             Improvement, Goucher Street from
    20080S1504B2454                 - 50 -     

     1             Menoher Boulevard, PA 271, Intersection
     2             to Westgate Drive, T-377, Westmont
     3             Borough and Lower Yoder Township              751,000
     4             (Base Project Allocation - $555,0000)
     5             (Land Allocation - $96,000)
     6             (Design and Contingencies - $100,000)
     7         (4)  SR 56, Various Safety and Mobility
     8             Improvements, PA 56 West Corridor,
     9             Lower Yoder Township Line to
    10             Intersection of Washington Street, City
    11             of Johnstown                                  950,000
    12             (Base Project Allocation - $630,000)
    13             (Land Allocation - $140,000)
    14             (Design and Contingencies - $180,000)
    15         (5)  SR 869, Roadway Realignment, Curve
    16             Adjustment Safety Improvement, Beaver
    17             Run Curve from Forest Street, T-503, to
    18             Village of Beaverdale, Adams and Croyle
    19             Townships                                     360,000
    20             (Base Project Allocation - $300,000)
    21             (Land Allocation - $30,000)
    22             (Design and Contingencies - $30,000)
    23         (6)  SR 219, Concrete Pavement Restoration
    24             and Overlay                                 1,620,000
    25             (Base Project Allocation - $1,620,000)
    26         (7)  SR 219, Concrete Pavement Restoration
    27             and Overlay                                 6,875,000
    28             (Design and Contingencies - $6,875,000)
    29         (8)  SR 219, Concrete Pavement Restoration
    30             and Overlay                                 4,000,000
    20080S1504B2454                 - 51 -     

     1             (Design and Contingencies - $4,000,000)
     2         (9)  SR 22, Concrete Pavement Restoration
     3             and Overlay                                 3,000,000
     4             (Base Project Allocation - $3,000,000)
     5         (10)  SR 22, Concrete Pavement Restoration
     6             and Overlay                                 8,228,000
     7             (Base Project Allocation - $8,228,000)
     8         (11)  SR 3024, Resurfacing and
     9             Reconstruction of Retaining Wall
    10             System                                      2,250,000
    11             (Design and Contingencies - $2,250,000)
    12  Section 312.  Cameron County (Reserved).
    13  Section 313.  Carbon County.
    14     Projects are as follows:
    15         (1)  SR 80, Install Dynamic Message Signs
    16             and Closed Circuit Television Cameras,
    17             I-80 Corridor, Round 1, Various
    18             Municipalities                                420,000
    19             (Base Project Allocation - $200,000)
    20             (Design and Contingencies - $220,000)
    21         (2)  SR 80, Install Dynamic Message Signs,
    22             Closed Circuit Television Cameras,
    23             Highway Advisory Radio and Highway
    24             Advisory Radio Beacons, I-80 Corridor,
    25             Round 2, Various Municipalities               390,000
    26             (Base Project Allocation - $205,000)
    27             (Design and Contingencies - $185,000)
    28         (3)  SR 8004, Lengthen Ramp, Rumble Strips,
    29             White Topping, Flashing Warning Device,
    30             I-80 Off Ramp Extension, East Side
    20080S1504B2454                 - 52 -     

     1             Borough                                       550,000
     2             (Base Project Allocation - $250,000)
     3             (Land Allocation - $150,000)
     4             (Design and Contingencies - $150,000)
     5         (4)  SR 80, Installation of 0.10 Milepost
     6             Markers on Interstates and Expressways,
     7             NEPA Mile Post Markers, Various
     8             Municipalities                                304,000
     9             (Base Project Allocation - $13,000)
    10             (Design and Contingencies - $291,000)
    11         (5)  I-80, Interstate Restoration and
    12             Reconstruction                              9,600,000
    13             (Base Project Allocation - $9,600,000)
    14         (6)  Various, Rehabilitation, Restoration
    15             or Reconstruction of Various Highways      12,175,000
    16             (Base Project Allocation - $9,131,000)
    17             (Land Allocation - $3,044,000)
    18  Section 314.  Centre County.
    19     Projects are as follows:
    20         (1)  SR 144, Retaining Wall Reconstruction,
    21             Linn Street, Section 320, Bellefonte
    22             Borough                                     1,400,000
    23             (Base Project Allocation - $1,400,000)
    24         (2)  SR 26, Safety Improvement, Pine Grove
    25             Mountain, Ferguson Township                   260,000
    26             (Base Project Allocation - $210,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $40,000)
    29         (3)  SR 3018, Safety Improvement, Atherton
    30             and University Drive, State College
    20080S1504B2454                 - 53 -     

     1             Borough                                     1,175,000
     2             (Base Project Allocation - $1,000,000)
     3             (Land Allocation - $75,000)
     4             (Design and Contingencies - $100,000)
     5         (4)  SR 322, Safety Improvement and
     6             Congestion Reduction, US 322 Corridor
     7             Safety Improvement, Harris and Potter
     8             Townships                                     360,000
     9             (Base Project Allocation - $300,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $50,000)
    12         (5)  SR 350, Safety Improvement, SR 350
    13             Curve Improvement and Truck Pull Off,
    14             Rush and Taylor Townships                     925,000
    15             (Base Project Allocation - $800,00)
    16             (Land Allocation - $25,000)
    17             (Design and Contingencies - $100,000)
    18         (6)  SR 45, Highway Restoration, Add
    19             Turning Lane, Turn Lane at SR 45 and SR
    20             144, Potter Township                        5,140,000
    21             (Base Project Allocation - $3,640,000)
    22             (Land Allocation - $1,300,000)
    23             (Design and Contingencies - $200,000)
    24         (7)  SR 550, Add Third Lane, Congestion
    25             Reduction, PA 550 Third Segment 440,
    26             Bellefonte Borough and Spring Township      4,325,000
    27             (Base Project Allocation - $3,245,000)
    28             (Land Allocation - $545,000)
    29             (Design and Contingencies - $535,000)
    30         (8)  SR 80, Acid Rock Discharge Mitigation,
    20080S1504B2454                 - 54 -     

     1             Jonathan Run, I-80 and SR 144, Boggs
     2             and Snow Shoe Townships                     1,320,000
     3             (Base Project Allocation - $1,300,000)
     4             (Land Allocation - $20,000)
     5         (9)  SR 80, Pavement Restoration,
     6             Rehabilitation, Interstate Improvement,
     7             I-80 Corridor, Boggs, Rush and Snow
     8             Shoe Townships                              1,530,000
     9             (Base Project Allocation - $1,500,000)
    10             (Design and Contingencies - $30,000)
    11         (10)  Various Routes, Regional ITS
    12             Initiatives, Regional ITS Operations
    13             Plan, Various Municipalities                  500,000
    14             (Base Project Allocation - $500,000)
    15         (11)  SR 3014, Retiming and Coordinating of
    16             18 Signals, Safety Improvement,
    17             Atherton Street Corridor, Valley Vista
    18             to Beaver Avenue, State College Borough
    19             and Ferguson and Patton Townships             400,000
    20             (Base Project Allocation - $300,000)
    21             (Land Allocation - $25,000)
    22             (Design and Contingencies - $75,000)
    23         (12)  I-80, Interstate Restoration and
    24             Reconstruction                             31,800,000
    25             (Base Project Allocation - $31,800,000)
    26         (13)  SR 150, Congested Corridor
    27             Improvements, Safety Improvements           1,237,000
    28             (Base Project Allocation - $1,143,000)
    29             (Land Allocation - $52,000)
    30             (Design and Contingencies - $42,000)
    20080S1504B2454                 - 55 -     

     1         (14)  SR 45, Park and Ride Lot                    777,000
     2             (Base Project Allocation - $672,000)
     3             (Land Allocation - $42,000)
     4             (Design and Contingencies - $63,000)
     5         (15)  I-80/US 220 AND PA 226, NEW I-80                     <--
     6             INTERCHANGE, MARION TOWNSHIP               45,240,000
     7             (BASE PROJECT ALLOCATION - $45,240,000)
     8         (16)  I-80 AND I-99, I-80/US 220, I-99, PA
     9             26, SR 1008, T427, NEW INTERCHANGE,
    10             MARION AND SPRING TOWNSHIPS               110,864,000
    11             (BASE PROJECT ALLOCATION -
    12             $110,864,000)
    13         (17)  US ROUTE 322, APPALACHIAN THRUWAY
    14             CORRIDOR O, FROM I-99 TO I-80, NEW
    15             CONSTRUCTION, POTTER AND HARRIS
    16             TOWNSHIPS                                 400,000,000
    17             (BASE PROJECT ALLOCATION -
    18             $400,000,000)
    19  SECTION 314.1.  CENTRE AND CLEARFIELD COUNTIES.
    20     PROJECTS ARE AS FOLLOWS:
    21         (1)  US ROUTE 322, SEVEN MOUNTAINS TO
    22             BOALSBURG, NEW CONSTRUCTION, FROM I-99
    23             TO I-80, WORTH, RUSH, MORRIS, COOPER
    24             AND GRAHAM TOWNSHIPS                      625,000,000
    25             (BASE PROJECT ALLOCATION -
    26             $625,000,000)
    27  Section 315.  Chester County.
    28     Projects are as follows:
    29         (1)  SR 30, Reconstruction, US 30, PA 10 to
    30             Exton Bypass, Various Municipalities       80,515,000
    20080S1504B2454                 - 56 -     

     1             (Base Project Allocation - $77,200,000)
     2             (Land Allocation - $1,000,000)
     3             (Design and Contingencies - $2,315,000)
     4         (2)  SR 1, Add Lanes and Widen to Six
     5             Lanes                                       3,800,000
     6             (Base Project Allocation - $3,800,000)
     7         (3)  SR 100, Widen and Add Lanes, to
     8             Provide Three Lanes Northbound and
     9             Southbound                                 21,586,000
    10             (Base Project Allocation - $21,586,000)
    11         (4)  SR 29, Add Lane                            5,370,000
    12             (Base Project Allocation - $5,370,000)
    13         (5)  SR 30, Intersection Improvement, Add
    14             Turn Lanes, Widen and Signals                 700,000
    15             (Base Project Allocation - $700,000)
    16         (6)  SR 41, Reconstruct - Transportation
    17             Study                                      10,000,000
    18             (Base Project Allocation - $8,000,000)
    19             (Land Allocation - $2,000,000)
    20         (7)  SR 52, Relocation, New Roadway             3,800,000
    21             (Base Project Allocation - $3,800,000)
    22         (8)  US 30, Pedestrian Facilities -
    23             Realignment and Widening to Accommodate
    24             Proposed Relocation                           600,000
    25             (Land Allocation - $600,000)
    26  Section 316.  Clarion County.
    27     Projects are as follows:
    28         (1)  I-81, Preventive Maintenance, PA 478
    29             Interchange to SR 3007 Interchange,
    30             Clarion, West I-80, Mill and Fill,
    20080S1504B2454                 - 57 -     

     1             Beaver and Richland Townships                 480,000
     2             (Base Project Allocation - $450,000)
     3             (Design and Contingencies - $30,000)
     4         (2)  SR 322, Drainage, Curbing,
     5             Restoration, US 322 from SR 208 to
     6             Station Road, Shippenville Borough and
     7             Elk Township                                  850,000
     8             (Base Project Allocation - $850,000)
     9         (3)  I-80, Interstate Restoration and
    10             Reconstruction                             27,800,000
    11             (Base Project Allocation - $27,800,000)
    12         (4)  SR 208, Safety and Intersection
    13             Improvements - Add Turning Lanes and
    14             Install a New Signal                          182,000
    15             (Base Project Allocation - $173,000)
    16             (Design and Contingencies - $9,000)
    17         (5)  SR 322, Pavement Reconstruction and
    18             Rehabilitation                                360,000
    19             (Base Project Allocation - $360,000)
    20         (6)  SR 66, Pavement Reconstruction and
    21             Rehabilitation                              1,580,000
    22             (Base Project Allocation - $1,580,000)
    23  Section 317.  Clearfield County.
    24     Projects are as follows:
    25         (1)  SR 219, Realignment and Signal
    26             Installation, Intersection of SR 219
    27             and SR 119, Brady Township                    225,000
    28             (Base Project Allocation - $160,000)
    29             (Land Allocation - $25,000)
    30             (Design and Contingencies - $40,000)
    20080S1504B2454                 - 58 -     

     1         (2)  SR 255, Signal Timing Project
     2             Improvements at 12 Signalized
     3             Intersections, DuBois Avenue from
     4             DuBois Street to DuBois Mall, Sandy
     5             Township and City of DuBois                 1,084,000
     6             (Base Project Allocation - $695,000)
     7             (Land Allocation - $286,000)
     8             (Design and Contingencies - $103,000)
     9         (3)  SR 53, Resurfacing, Signal, Add
    10             Turning Lane, Ninth Street
    11             Intersection, SR 53 and SR 2043, Morris
    12             Township                                      800,000
    13             (Base Project Allocation - $650,000)
    14             (Land Allocation - $50,000)
    15             (Design and Contingencies - $100,000)
    16         (4)  SR 53, Center Line Rumble Strips,
    17             Safety Improvement, SR 53 Corridor,
    18             Various Municipalities                         54,000
    19             (Base Project Allocation - $54,000)
    20         (5)  Various Routes, Regional ITS
    21             Initiatives, Regional ITS Operations
    22             Plan, Various Municipalities                  500,000
    23             (Base Project Allocation - $500,000)
    24         (6)  I-80, Interstate Restoration and
    25             Reconstruction                             41,200,000
    26             (Base Project Allocation - $41,200,000)
    27         (7)  SR 4019, Reconstruction, Realigning of
    28             Hospital Avenue to the West                   450,000
    29             (Base Project Allocation - $450,000)
    30  Section 318.  Clinton County.
    20080S1504B2454                 - 59 -     

     1     Projects are as follows:
     2         (1)  SR 220, New Interchange with Bridge
     3             and Safety Improvements, Auction Road,
     4             SR 220, Segment 30 and SR 2008, Segment
     5             50, Lamar Township                            925,000
     6             (Base Project Allocation - $800,000)
     7             (Land Allocation - $25,000)
     8             (Design and Contingencies - $100,000)
     9         (2)  Various Routes, Regional ITS
    10             Initiatives, Regional ITS Operations
    11             Plan, Various Municipalities                  500,000
    12             (Base Project Allocation - $500,00)
    13         (3)  SR 80, Pavement Restoration,
    14             Rehabilitation and Bridge Parapets, I-
    15             80 Corridor, Greene, Lamar, Marion and
    16             Porter Townships                            2,530,000
    17             (Base Project Allocation - $2,500,000)
    18             (Design and Contingencies - $30,000)
    19         (4)  SR 120, Access Road for First Quality
    20             Tissue Plant, Castenea Township and
    21             Lock Haven City                             8,750,000
    22             (Base Project Allocation - $8,000,000)
    23             (Land Allocation - $500,000)
    24             (Design and Contingencies - $250,000)
    25         (5)  I-80, Interstate Restoration and
    26             Reconstruction                             23,500,000
    27             (Base Project Allocation - $23,500,000)
    28  Section 319.  Columbia County.
    29     Projects are as follows:
    30         (1)  SR 11, Pavement Reconstruction,
    20080S1504B2454                 - 60 -     

     1             Rehabilitation, SR 11, Segment 380 to
     2             Segment 431, Berwick Borough                   30,000
     3             (Design and Contingencies - $30,000)
     4         (2)  SR 42, Concrete and Pavement
     5             Reconstruction, Rehabilitation, SR 42
     6             from I-80 Interchange to Mall,
     7             Including Ramps, Hemlock Township           1,098,000
     8             (Base Project Allocation - $1,058,000)
     9             (Design and Contingencies - $40,000)
    10         (3)  I-80, Interstate Restoration and
    11             Reconstruction                             18,800,000
    12             (Base Project Allocation - $18,800,000)
    13         (4)  SR 1019, Resurfacing, Restoration            415,000
    14             (Base Project Allocation - $405,000)
    15             (Land Allocation - $10,000)
    16         (5)  SR 4009, Resurfacing, Restoration            880,000
    17             (Base Project Allocation - $870,000)
    18             (Land Allocation - $10,000)
    19         (6)  SR 42, Resurfacing, Restoration            1,810,000
    20             (Base Project Allocation - $1,800,000)
    21             (Land Allocation - $10,000)
    22         (7)  SR 42, Resurfacing, Restoration            2,270,000
    23             (Base Project Allocation - $2,260,000)
    24             (Land Allocation - $10,000)
    25         (8)  SR 42, Resurfacing, Restoration            1,710,000
    26             (Base Project Allocation - $1,700,000)
    27             (Land Allocation - $10,000)
    28         (9)  SR 487, Resurfacing, Restoration             960,000
    29             (Base Project Allocation - $950,000)
    30             (Land Allocation - $10,000)
    20080S1504B2454                 - 61 -     

     1         (10)  SR 487, Resurfacing, Restoration            910,000
     2             (Base Project Allocation - $900,000)
     3             (Land Allocation - $10,000)
     4  Section 320.  Crawford County.
     5     Projects are as follows:
     6         (1)  I-79, Interstate Restoration and
     7             Reconstruction                             27,140,000
     8             (Base Project Allocation - $27,140,000)
     9         (2)  PA 27, Corridor Safety Improvement,
    10             Flatten Relocate Curve                        165,000
    11             (Base Project Allocation - $76,000)
    12             (Land Allocation - $11,000)
    13             (Design and Contingencies - $78,000)
    14         (3)  SR 198, Relocation and Realignment,
    15             Improve Turning Radii, Surface
    16             Improvements and Drainage                     480,000
    17             (Base Project Allocation - $400,000)
    18             (Land Allocation - $52,000)
    19             (Design and Contingencies - $28,000)
    20         (4)  SR 6, Concrete Pavement Restoration
    21             and Overlay                                 1,533,000
    22             (Base Project Allocation - $1,533,000)
    23  Section 321.  Cumberland County.
    24     Projects are as follows:
    25         (1)  I-81, Interstate Restoration and
    26             Reconstruction                             38,200,000
    27             (Base Project Allocation - $38,200,000)
    28         (2)  I-83, Interstate Restoration and
    29             Reconstruction                              1,700,000
    30             (Base Project Allocation - $1,700,000)
    20080S1504B2454                 - 62 -     

     1         (3)  SR 465, Interchange Improvement           10,411,000
     2             (Base Project Allocation - $10,411,000)
     3  Section 322.  Dauphin County.
     4     Projects are as follows:
     5         (1)  SR 83, Widen, Add Lane, Interchange
     6             Improvement, Reconstruct, I-83, East
     7             Shore, Section 1 from Eisenhower
     8             Interchange to I-81, Lower Paxton,
     9             Susquehanna and Swatara Townships           2,062,000
    10             (Land Allocation - $1,262,000)
    11             (Design and Contingencies - $800,000)
    12         (2)  I-283, Interstate Restoration and
    13             Reconstruction                              2,500,000
    14             (Base Project Allocation - $2,500,000)
    15         (3)  I-81, Interstate Restoration and
    16             Reconstruction                             16,000,000
    17             (Base Project Allocation - $16,000,000)
    18         (4)  I-83, Interstate Restoration and
    19             Reconstruction                              8,400,000
    20             (Base Project Allocation - $8,400,000)
    21         (5)  SR 422, Intersection Improvements,
    22             Widen, Add Turning Lanes and Traffic
    23             Signals                                     6,193,000
    24             (Base Project Allocation - $3,836,000)
    25             (Design and Contingencies - $2,357,000)
    26         (6)  SR 39, SR 422, SR 2005, EXTEND ON-RAMP                <--
    27             FROM SR 39 ONTO SR 422 TO SR 2005           2,500,000
    28             (BASE PROJECT ALLOCATION - $2,500,000)
    29         (7)  SR 2003, SR 2034, ADD RIGHT TURN LANE
    30             ON SR 2003 (MIDDLETOWN-HUMMELSTOWN ROAD
    20080S1504B2454                 - 63 -     

     1             AT INTERSECTION WITH SR 2034) FROM
     2             MIDDLETOWN TO HUMMELSTOWN                   3,100,000
     3             (BASE PROJECT ALLOCATION - $3,100,000)
     4         (8)  SR 3002, EXTEND CURRENT RIGHT TURN
     5             LANE IN FRONT OF LOTTERY BUILDING TO
     6             LOWER SWATARA FIRE DEPARTMENT BUILDING,
     7             REMOVE CURB EXTENSION AND RELOCATE
     8             STORM DRAIN IN FRONT OF LOTTERY
     9             BUILDING TO ORIGINAL POSITION               1,200,000
    10             (BASE PROJECT ALLOCATION - $1,200,000)
    11         (9)  SR 283, ADD DECELERATION/ACCELERATION
    12             LANES ON SR 283 FOR EMERGENCY CROSSOVER
    13             AND PAVE CROSSOVER TO MEET FEDERAL
    14             STANDARDS                                   2,300,000
    15             (BASE PROJECT ALLOCATION - $2,300,000)
    16         (10)  SR 2019, SR 3012, WIDEN SR 2019
    17             (MILROY ROAD) AND REPLACE UNDERPASS
    18             BETWEEN SR 3012 (DERRY STREET) AND
    19             GRAYSON ROAD                               12,500,000
    20             (BASE PROJECT ALLOCATION - $12,500,000)
    21  Section 323.  Delaware County.
    22     Projects are as follows:
    23         (1)  SR 2028, Channelization and Vertical
    24             Clear Improvements, Corridor Safety
    25             Improvement, New Traffic Signal,
    26             Chestnut Street and Morton Avenue, 10th
    27             to 12th Streets, City of Chester            1,300,000
    28             (Base Project Allocation - $1,000,000)
    29             (Land Allocation - $60,000)
    30             (Design and Contingencies - $240,000)
    20080S1504B2454                 - 64 -     

     1         (2)  SR 3018, New Roadway, Bridgewater Road
     2             Extension, Brookhaven Borough and Aston
     3             Township                                    2,040,000
     4             (Base Project Allocation - $1,800,000)
     5             (Land Allocation - $240,000)
     6         (3)  I-476, Interstate Restoration and
     7             Reconstruction                             14,000,000
     8             (Base Project Allocation - $14,000,000)
     9         (4)  I-95, Interstate Restoration and
    10             Reconstruction                             11,000,000
    11             (Base Project Allocation - $11,000,000)
    12  Section 324.  Elk County.
    13     Projects are as follows:
    14         (1)  SR 255, Highway Restoration, Drainage,
    15             Guide Rail and Concrete Pavement
    16             Reconstruction, Rehabilitation, SR 255,
    17             Million Dollar Highway, Segment 0230 to
    18             Segment 0280, City of St. Marys             4,915,000
    19             (Base Project Allocation - $4,785,000)
    20             (Land Allocation - $50,000)
    21             (Design and Contingencies - $80,000)
    22         (2)  SR 255, Update Signals, Safety
    23             Improvement, Vine and Arch Street
    24             Signals, City of St. Marys                    175,000
    25             (Base Project Allocation - $100,000)
    26             (Land Allocation - $25,000)
    27             (Design and Contingencies - $50,000)
    28  Section 325.  Erie County.
    29     Projects are as follows:
    30         (1)  SR 19, Intersection Improvements,
    20080S1504B2454                 - 65 -     

     1             Waterford at SR 19 and SR 97, Waterford
     2             Borough and Waterford Township                335,000
     3             (Base Project Allocation - $200,000)
     4             (Land Allocation - $60,000)
     5             (Design and Contingencies - $75,000)
     6         (2)  SR 8, Safety Improvement Study, SR 8,
     7             Parade Street at 28th Street
     8             Intersection, City of Erie                    200,000
     9             (Base Project Allocation - $100,00)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $80,000)
    12         (3)  Various Routes, Construction and
    13             Coordination of an ITS Command Center,
    14             Erie ITS Initiative, Various
    15             Municipalities                                300,000
    16             (Base Project Allocation - $200,00)
    17             (Design and Contingencies - $100,000)
    18         (4)  I-79, Interstate Restoration and
    19             Reconstruction                             19,000,000
    20             (Base Project Allocation - $19,000,000)
    21         (5)  I-86, Interstate Restoration and
    22             Reconstruction                              6,500,000
    23             (Base Project Allocation - $6,500,000)
    24         (6)  I-90, Interstate Restoration and
    25             Reconstruction                             46,000,000
    26             (Base Project Allocation - $46,000,000)
    27  Section 326.  Fayette County.
    28     Projects are as follows:
    29         (1)  SR 119, Highway Restoration, SR 119
    30             from Everson to West County Line,
    20080S1504B2454                 - 66 -     

     1             Bullskin and Upper Tyrone Townships         5,100,000
     2             (Base Project Allocation - $5,100,000)
     3         (2)  SR 166, Existing Signal Improvement,
     4             SR 166 at New Salem Road, Luzerne
     5             Township                                      290,000
     6             (Base Project Allocation - $150,000)
     7             (Land Allocation - $40,000)
     8             (Design and Contingencies - $100,000)
     9         (3)  SR 21, Highway Restoration, SR 21 from
    10             Footdale Road to Duck Hollow Road,
    11             German, Menallen and South Union
    12             Townships                                   3,000,000
    13             (Base Project Allocation - $3,000,000)
    14         (4)  SR 40, Highway Restoration, SR 40 from
    15             Farmington to Dinnerbell Road, Wharton
    16             Township                                    3,200,000
    17             (Base Project Allocation - $3,200,000)
    18         (5)  SR 51, Highway Restoration, SR 51 from
    19             SR 4046 to Westmoreland County Line,
    20             Perryopolis Borough and Perry Township      5,200,000
    21             (Base Project Allocation - $5,200,000)
    22         (6)  SR 88, Highway Reconstruction, Main
    23             Street, Point Marion, Point Marion
    24             Borough                                       458,000
    25             (Base Project Allocation - $200,000)
    26             (Land Allocation - $58,000)
    27             (Design and Contingencies - $200,000)
    28         (7)  SR 119, Existing Signal Improvement          537,000
    29             (Base Project Allocation - $433,000)
    30             (Design and Contingencies - $104,000)
    20080S1504B2454                 - 67 -     

     1         (8)  SR 21, Intersection Improvement, Add
     2             Turning Lanes                                 206,000
     3             (Base Project Allocation - $109,000)
     4             (Land Allocation - $42,000)
     5             (Design and Contingencies - $55,000)
     6         (9)  SR 40, Intersection Improvement              284,000
     7             (Base Project Allocation - $226,000)
     8             (Land Allocation - $26,000)
     9             (Design and Contingencies - $32,000)
    10         (10)  SR 711, Truck Traffic Study,
    11             Restoration or New Truck Pull-offs and
    12             Escape Ramp, Possible Relocations Truck
    13             Traffic                                     2,926,000
    14             (Base Project Allocation - $2,250,000)
    15             (Land Allocation - $416,000)
    16             (Design and Contingencies - $260,000)
    17  Section 327.  Forest County.
    18     Projects are as follows:
    19         (1)  SR 66, Highway Restoration                   611,000
    20             (Base Project Allocation - $611,000)
    21  Section 328.  Franklin County.
    22     Projects are as follows:
    23         (1)  SR 11, Intersection Improvements,
    24             Widening, Turning Lanes, Signal Updates
    25             and Resurfacing, Antrim Way
    26             Intersection, US 11 and PA 16,
    27             Greencastle Borough and Antrim
    28             Township                                    1,725,000
    29             (Base Project Allocation - $1,725,000)
    30         (2)  Route 11, Intersection Improvement of
    20080S1504B2454                 - 68 -     

     1             Route 11 and Route 997, Greene
     2             Township                                    1,200,000
     3         (3)  I-81, Interstate Restoration and
     4             Reconstruction                             25,000,000
     5             (Base Project Allocation - $25,000,000)
     6  Section 329.  Fulton County.
     7     Projects are as follows:
     8         (1)  SR 16, Intersection and Turn Lane
     9             Improvement, PA 6 and JLG Drive, Ayr
    10             Township                                      170,000
    11             (Base Project Allocation - $170,000)
    12         (2)  SR 522, Intersection and Curve
    13             Improvements, Safety Improvement, US
    14             522 from Timber Ridge Road, SR 2005, to
    15             South of Gem Road, SR 2003, Belfast
    16             Township                                      700,000
    17             (Base Project Allocation - $600,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $80,000)
    20         (3)  SR 70, Culvert Replacement, Drainage
    21             Improvement, I-70 over Tributary of
    22             Little Tonoloway Creek, Bethel
    23             Township                                      605,000
    24             (Base Project Allocation - $500,000)
    25             (Design and Contingencies - $105,000)
    26         (4)  SR 70, Restoration, Rehabilitation,
    27             Safety Improvements, I-70 Eastbound,
    28             Bedford County, Amaranth, Brush Creek
    29             and Union Townships                           900,000
    30             (Base Project Allocation - $900,000)
    20080S1504B2454                 - 69 -     

     1         (5)  SR 70, Restoration, Rehabilitation,
     2             Safety Improvements, I-70 Amaranth to
     3             Maryland Line, Bethel, Brush Creek and
     4             Union Townships                             1,420,000
     5             (Base Project Allocation - $1,420,000)
     6         (6)  I-70, Interstate Restoration and
     7             Reconstruction                             19,600,000
     8             (Base Project Allocation - $19,600,000)
     9         (7)  SR 30, Concrete Pavement Restoration
    10             and Overlay                                 3,600,000
    11             (Base Project Allocation - $3,600,000)
    12  Section 330.  Greene County.
    13     Projects are as follows:
    14         (1)  SR 21, Highway Restoration, PA 21 from
    15             SR 4017 to PA 18, Center Township           4,700,000
    16             (Base Project Allocation - $4,700,000)
    17         (2)  SR 21, Highway Restoration, SR 21 from
    18             Junction Deli to Paisley, Cumberland
    19             and Monongahela Townships                   3,500,000
    20             (Base Project Allocation - $3,500,000)
    21         (3)  SR 21, Highway Restoration, SR 21 from
    22             Paisley to Masontown Bridge, Cumberland
    23             and Monongahela Townships                   4,800,000
    24             (Base Project Allocation - $4,800,000)
    25         (4)  SR 79, Interstate Reconstruction, I-79
    26             No.2 from Milepost 0 to Milepost 14,
    27             Franklin and Whiteley Townships             3,255,000
    28             (Base Project Allocation - $3,000,000)
    29             (Design and Contingencies - $255,000)
    30         (5)  SR 79, Concrete Pavement
    20080S1504B2454                 - 70 -     

     1             Reconstruction, Rehabilitation, I-79
     2             No.1 from Milepost 0 to Milepost 14,
     3             Franklin, Perry and Whiteley Townships      3,000,000
     4             (Base Project Allocation - $2,500,000)
     5             (Design and Contingencies - $500,000)
     6         (6)  SR 79, Resurfacing, Smoother Roads, I-
     7             79, Franklin, Washington and Whiteley
     8             Townships                                  12,750,000
     9             (Base Project Allocation - $12,750,000)
    10         (7)  SR 79, Reconstruction of Mainline, I-
    11             79, Segment 0174 to Segment 0210 and
    12             Segment 0175 to Segment 0211,
    13             Washington Township                         1,680,000
    14             (Base Project Allocation - $1,500,000)
    15             (Design and Contingencies - $180,000)
    16         (8)  SR 79, Interstate Reconstruction, I-
    17             79, Segment 0064 to Segment 0114 and
    18             Segment 0065 to Segment 0115, in area
    19             of Longwall Mining, Franklin and
    20             Whiteley Townships                          2,800,000
    21             (Base Project Allocation - $2,600,000)
    22             (Design and Contingencies - $200,000)
    23         (9)  SR 88, Highway Restoration, SR 88 from
    24             Point Marion to Dilliner, Dunkard and
    25             Monongahela Townships                       4,300,000
    26             (Base Project Allocation - $4,300,000)
    27         (10)  I-79, Interstate Restoration and
    28             Reconstruction                             21,400,000
    29             (Base Project Allocation - $21,400,000)
    30         (11)  SR 21, Highway Reconstruction             3,000,000
    20080S1504B2454                 - 71 -     

     1             (Base Project Allocation - $3,000,000)
     2  Section 331.  Huntingdon County.
     3     Projects are as follows:
     4         (1)  SR 26, Two-Lane Relocation Bypass, SR
     5             26 from PA 305 to near Sawmill Road, T-
     6             528, Jackson Township                       2,285,000
     7             (Base Project Allocation - $1,700,000)
     8             (Land Allocation - $94,000)
     9             (Design and Contingencies - $491,000)
    10         (2)  PA 26, Slide and Sink Hole Repair
    11             under Roadway, Replace Embankment and
    12             Roadway Structure                             865,000
    13             (Base Project Allocation - $865,000)
    14         (3)  SR 3001, Restoration, Widen and
    15             Overlay                                     6,210,000
    16             (Base Project Allocation - $5,200,000)
    17             (Land Allocation - $600,000)
    18             (Design and Contingencies - $410,000)
    19         (4)  SR 453, Restoration, Rehabilitation
    20             and Truck Climbing Lane                     8,003,000
    21             (Base Project Allocation - $8,003,000)
    22         (5)  SR 655, Reconstruction, Utility
    23             Relocation and Drainage Improvement           600,000
    24             (Base Project Allocation - $600,000)
    25  Section 332.  Indiana County.
    26     Projects are as follows:
    27         (1)  SR 119, Sign Structure, Bridge
    28             Expansion, Dam Replacement, White
    29             Township                                        6,000
    30             (Base Project Allocation - $5,000)
    20080S1504B2454                 - 72 -     

     1             (Design and Contingencies - $1,000)
     2         (2)  SR 217, Intersection and Safety
     3             Improvements, PA 217 and SR 3009,
     4             Newport Road Intersection, Burrell
     5             Township                                       72,000
     6             (Base Project Allocation - $60,000)
     7             (Land Allocation - $12,000)
     8         (3)  SR 22, Highway Restoration and
     9             Resurfacing, Armagh Bypass East, SR 22
    10             from PA 56 to PA 403, East Wheatfield
    11             Township                                      640,000
    12             (Base Project Allocation - $600,000)
    13             (Design and Contingencies - $40,000)
    14         (4)  SR 22, Highway Restoration and
    15             Resurfacing, Armagh Bypass West, T-893,
    16             McClain Hill Road, to PA 56
    17             Interchange, East Wheatfield Township         640,000
    18             (Base Project Allocation - $600,000)
    19             (Design and Contingencies - $40,000)
    20         (5)  SR 3011, Reestablish Railroad
    21             Crossing, Blacklick Railroad Crossing,
    22             near Intersection of SR 3011 and US
    23             119, Burrell Township                         120,000
    24             (Base Project Allocation - $120,000)
    25         (6)  SR 422, Preventive Maintenance,
    26             Resurface, US 422 from US 119 East to
    27             PA 954, Cherryhill and White Townships        168,000
    28             (Base Project Allocation - $168,000)
    29         (7)  SR 3013, Corridor Safety Improvement,
    30             Intersection Reconstruction                    94,000
    20080S1504B2454                 - 73 -     

     1             (Base Project Allocation - $94,000)
     2         (8)  SR 119, Pavement Reconstruction and
     3             Rehabilitation                              1,200,000
     4             (Base Project Allocation - $1,200,000)
     5         (9)  SR 422, Pavement Reconstruction and
     6             Rehabilitation                                840,000
     7             (Base Project Allocation - $840,000)
     8         (10)  SR 422, Pavement Reconstruction and
     9             Rehabilitation                              1,000,000
    10             (Base Project Allocation - $1,000,000)
    11         (11)  SR 422, Pavement Reconstruction and
    12             Rehabilitation                                480,000
    13             (Base Project Allocation - $480,000)
    14  Section 333.  Jefferson County.
    15     Projects are as follows:
    16         (1)  SR 28, Highway Restoration, SR 28 from
    17             SR 28/36/322 Intersection to 1.5 Miles
    18             South of Intersection, Brookville
    19             Borough and Rose Township                     510,000
    20             (Base Project Allocation - $450,000)
    21             (Land Allocation - $40,000)
    22             (Design and Contingencies - $20,000)
    23         (2)  SR 80, Interstate Restoration,
    24             Rehabilitation, I-80, Segment 775 to
    25             Segment 841 and Segment 774 to Segment
    26             840, Brookville Borough, Pine Creek and
    27             Rose Townships                              2,770,000
    28             (Base Project Allocation - $2,700,000)
    29             (Design and Contingencies - $70,000)
    30         (3)  SR 80, Interstate Restoration,
    20080S1504B2454                 - 74 -     

     1             Rehabilitation, West I-80, Segment 841
     2             to Segment 881 and Segment 840 to
     3             Segment 880, Rose and Union Townships         320,000
     4             (Base Project Allocation - $300,000)
     5             (Design and Contingencies - $20,000)
     6         (4)  I-80, Interstate Restoration and
     7             Reconstruction                             23,600,000
     8             (Base Project Allocation - $23,600,000)
     9         (5)  SR 219, Pavement Reconstruction and
    10             Rehabilitation                                140,000
    11             (Base Project Allocation - $140,000)
    12         (6)  US 119, Flatten the Existing Sharp
    13             Horizontal Curve, Add Left-turn Standby
    14             Lanes and Improve Intersection Sight
    15             Distance                                      458,000
    16             (Base Project Allocation - $146,000)
    17             (Design and Contingencies - $312,000)
    18         (7)  Various, Safety, Congestion Relief,
    19             Add Turning Lane, Existing Signal
    20             Improvement                                   325,000
    21             (Land Allocation - $325,000)
    22  Section 334.  Juniata County.
    23     Projects are as follows:
    24         (1)  SR 1007, Reconstruction, SR 1007 from
    25             Irving Street to Union Boulevard and
    26             Airport Road to Lloyd Street, Tuscarora
    27             Township                                      110,000
    28             (Base Project Allocation - $75,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $25,000)
    20080S1504B2454                 - 75 -     

     1         (2)  SR 3002, Center Turn Lane, Safety
     2             Improvement, Intersection of SR 3002
     3             and SR 3005, Fermanagh and Walker
     4             Townships                                     180,000
     5             (Base Project Allocation - $120,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $50,000)
     8         (3)  SR 35, SR 4005, Removal of a House at
     9             the Intersection, Safety Improvement,
    10             SR 35 and Black Log Road, SR 4005,
    11             Tuscarora Township                             22,000
    12             (Base Project Allocation - $5,000)
    13             (Land Allocation - $15,000)
    14             (Design and Contingencies - $2,000)
    15  Section 335.  Lackawanna County.
    16     Projects are as follows:
    17         (1)  SR 1012, Intersection Improvement,
    18             Kennedy Drive and County Road
    19             Intersection, Archbald Borough                120,000
    20             (Base Project Allocation - $120,000)
    21         (2)  SR 81, Restoration, I-81 Northbound
    22             and Southbound Concrete Grinding,
    23             Dunmore Borough, City of Scranton             270,000
    24             (Base Project Allocation - $190,000)
    25             (Design and Contingencies - $80,000)
    26         (3)  SR 81, SR 84, ITS Improvements and
    27             Purchases, I-81 Corridor, I-84
    28             Corridor, I-380 Corridor, US 6
    29             Corridor, Various Municipalities              700,000
    30             (Base Project Allocation - $600,000)
    20080S1504B2454                 - 76 -     

     1             (Design and Contingencies - $100,000)
     2         (4)  I-380, Interstate Restoration and
     3             Reconstruction                             10,400,000
     4             (Base Project Allocation - $10,400,000)
     5         (5)  I-81, Interstate Restoration and
     6             Reconstruction                             26,400,000
     7             (Base Project Allocation - $26,400,000)
     8         (6)  I-84, Interstate Restoration and
     9             Reconstruction                             12,100,000
    10             (Base Project Allocation - $12,100,000)
    11         (7)  SR 435, Safety and Intersection
    12             Improvements                                  271,000
    13             (Base Project Allocation - $271,000)
    14         (8)  SR 11, New Traffic Signal                     86,000
    15             (Land Allocation - $65,000)
    16             (Design and Contingencies - $21,000)
    17         (9)  SR 502, Roadway and Slope Repairs            400,000
    18             (Base Project Allocation - $336,000)
    19             (Land Allocation - $44,000)
    20             (Design and Contingencies - $20,000)
    21         (10)  SR 84, Pipe Replacement                     107,000
    22             (Base Project Allocation - $100,000)
    23             (Land Allocation - $7,000)
    24  Section 336.  Lancaster County.
    25     Projects are as follows:
    26         (1)  SR 222, Pave Shoulders, Base Repair,
    27             Pavement Reconstruction,
    28             Rehabilitation, US 222 from North of US
    29             322 to County Line, Brecknock, East
    30             Cocalico and Ephrata Townships              2,395,000
    20080S1504B2454                 - 77 -     

     1             (Base Project Allocation - $2,280,000)
     2             (Land Allocation - $50,000)
     3             (Design and Contingencies - $65,000)
     4         (2)  SR 222, Structural Overlay, Resurface,
     5             Shoulder Improvement, US 222 from North
     6             of Bushong Road to US 322, Ephrata,
     7             Manheim, Warwick and West Earl
     8             Townships                                   3,515,000
     9             (Base Project Allocation - $3,400,000)
    10             (Land Allocation - $50,000)
    11             (Design and Contingencies - $65,000)
    12         (3)  SR 222, Shoulders, Intersection, Base
    13             Repair, Drainage, Structure Overlay,
    14             Beaver Valley Pike, US 222 from
    15             Quarryville to Willow Street,
    16             Quarryville Borough, Providence,
    17             Strasburg and West Lampeter Townships       1,640,000
    18             (Base Project Allocation - $1,500,000)
    19             (Land Allocation - $100,000)
    20             (Design and Contingencies - $40,000)
    21         (4)  SR 30, Concrete Pavement
    22             Reconstruction, Rehabilitation, US 30
    23             from PA 283 to East of US 222, East
    24             Lampeter and Manheim Townships, City of
    25             Lancaster                                   4,048,000
    26             (Base Project Allocation - $3,978,000)
    27             (Land Allocation - $20,000)
    28             (Design and Contingencies - $50,000)
    29         (5)  SR 30, Add Turning Lane, Corridor
    30             Safety, Single and Intersection
    20080S1504B2454                 - 78 -     

     1             Improvements, Lincoln Highway Corridor
     2             from PA 41 to PA 772, Salisbury
     3             Township                                    1,170,000
     4             (Base Project Allocation - $750,000)
     5             (Land Allocation - $200,000)
     6             (Design and Contingencies - $220,000)
     7         (6)  SR 23, Transportation Study                  578,000
     8             (Land Allocation - $578,000)
     9  Section 337.  Lawrence County.
    10     Projects are as follows:
    11         (1)  SR 1012, Concrete Rehabilitation,
    12             Reconstruct and Bituminous Overlay,
    13             Frew Mill Road from Bridge over Big Run
    14             to Young Road, Shenango and Slippery
    15             Rock Townships                              2,700,000
    16             (Base Project Allocation - $2,700,000)
    17         (2)  SR 108, Concrete Pavement
    18             Reconstruction, Rehabilitation,
    19             Harlansburg Road from SR 388 to Brown
    20             Road, Hickory and Scott Townships           1,391,000
    21             (Base Project Allocation - $1,264,000)
    22             (Design and Contingencies - $127,000)
    23         (3)  SR 108, Concrete Rehabilitation,
    24             Reconstruct and Bituminous Overlay,
    25             Harlansburg Road from Cascade Street to
    26             SR 388, Hickory Township, City of New
    27             Castle                                        923,000
    28             (Base Project Allocation - $923,000)
    29         (4)  SR 168, Concrete Rehabilitation,
    30             Reconstruct and Bituminous Overlay,
    20080S1504B2454                 - 79 -     

     1             Eastbrook Road from SR 18 to Industrial
     2             Boulevard, North Beaver and Taylor
     3             Townships                                   3,000,000
     4             (Base Project Allocation - $3,000,000)
     5         (5)  SR 168, Concrete Rehabilitation,
     6             Reconstruct and Bituminous Overlay,
     7             Third Street from Industrial Boulevard
     8             to Cherry Street, Taylor Township           2,001,000
     9             (Base Project Allocation - $2,001,000)
    10         (6)  SR 18, Upgrade and Coordinate 9
    11             Signals, Safety Improvement, SR 18 in
    12             New Castle Business District from Grant
    13             Avenue to Mahoning Avenue and Moravia
    14             Street, City of New Castle                     25,000
    15             (Design and Contingencies - $25,000)
    16         (7)  SR 19, Resurfacing Restoration, Perry
    17             Highway from SR 108 to SR 1015, Scott
    18             and Washington Townships                    2,700,000
    19             (Base Project Allocation - $2,700,000)
    20         (8)  SR 19, Concrete Pavement
    21             Reconstruction, Rehabilitation, Perry
    22             Highway from SR 1018 to Mercer County
    23             Line, Washington Township                   1,173,000
    24             (Base Project Allocation - $1,066,000)
    25             (Design and Contingencies - $107,000)
    26         (9)  SR 2032, Concrete Pavement
    27             Reconstruction, Rehabilitation, Cherry
    28             Street from SR 18 to SR 168, City of
    29             New Castle                                  1,100,000
    30             (Base Project Allocation - $1,000,000)
    20080S1504B2454                 - 80 -     

     1             (Design and Contingencies - $100,000)
     2         (10)  SR 351, Safety Improvement, SR 351
     3             from Ellwood City, 5th Street to 9th
     4             Street, Ellwood City Borough                  233,000
     5             (Base Project Allocation - $220,000)
     6             (Design and Contingencies - $13,000)
     7         (11)  SR 4002, Concrete Pavement
     8             Reconstruction, Rehabilitation, Sampson
     9             Street from Intersection SR 422 and SR
    10             60 to beginning of Asphalt Overlay,
    11             Union Township                                330,000
    12             (Base Project Allocation - $300,000)
    13             (Design and Contingencies - $30,000)
    14         (12)  SR 4005, Concrete Rehabilitation,
    15             Reconstruct and Bituminous Overlay,
    16             River Road from Chapin Road to Nashua
    17             Road, Neshannock and Pulaski Townships        650,000
    18             (Base Project Allocation - $650,000)
    19         (13)  SR 422, Concrete Pavement
    20             Reconstruction, Rehabilitation, Ben
    21             Franklin Highway from Pine Glen Road to
    22             Zoccoli Road, Mahoning and Pulaski
    23             Townships                                   4,357,000
    24             (Base Project Allocation - $3,961,000)
    25             (Design and Contingencies - $396,000)
    26         (14)  SR 422, Concrete Rehabilitation,
    27             Reconstruct and Bituminous Overlay, Ben
    28             Franklin Highway from Zoccoli Road to
    29             Matthews Road, Mahoning and Union
    30             Townships                                   1,700,000
    20080S1504B2454                 - 81 -     

     1             (Base Project Allocation - $1,700,000)
     2         (15)  SR 422, Realignment and Roadway
     3             Reconstruction, Freedom Road Upgrade,
     4             Phase A, New Sewickley Township                16,000
     5             (Base Project Allocation - $15,000)
     6             (Design and Contingencies - $1,000)
     7         (16)  SR 422, Concrete Pavement
     8             Reconstruction, Rehabilitation, Ben
     9             Franklin Highway from Shenango Township
    10             Line to Copper Road, Shenango, Slippery
    11             Rock and Union Townships                    3,300,000
    12             (Base Project Allocation - $3,300,000)
    13         (17)  SR 422, Concrete Pavement
    14             Reconstruction, Rehabilitation, Ben
    15             Franklin Highway from Stoner Drive to
    16             Bridge over Slippery Rock, Slippery
    17             Rock Township                               1,980,000
    18             (Base Project Allocation - $1,800,000)
    19             (Design and Contingencies - $180,000)
    20         (18)  SR 422, Concrete Pavement
    21             Reconstruction, Rehabilitation, Ben
    22             Franklin Highway, Northbound from
    23             Bridge over Slippery Rock Bridge to
    24             Butler City Line, Slippery Rock
    25             Township                                    1,100,000
    26             (Base Project Allocation - $1,000,000)
    27             (Design and Contingencies - $100,000)
    28         (19)  SR 422, Concrete Pavement
    29             Reconstruction, Rehabilitation, Ben
    30             Franklin Highway, Southbound from
    20080S1504B2454                 - 82 -     

     1             Bridge over Slippery Rock Bridge to
     2             Butler City Line, Slippery Rock
     3             Township                                    1,100,000
     4             (Base Project Allocation - $1,000,000)
     5             (Design and Contingencies - $100,000)
     6         (20)  SR 422, Concrete Pavement
     7             Reconstruction, Rehabilitation, Ben
     8             Franklin Highway from Copper Road to
     9             Stoner Drive, Slippery Rock Township        4,071,000
    10             (Base Project Allocation - $3,701,000)
    11             (Design and Contingencies - $370,000)
    12         (21)  SR 422, Concrete Rehabilitation,
    13             Reconstruction, SR 422 from SR 60 to
    14             Turnpike, Union Township                    1,202,000
    15             (Base Project Allocation - $1,095,000)
    16             (Design and Contingencies - $107,000)
    17         (22)  SR 422, SR 2004, Concrete Pavement
    18             Reconstruction, Rehabilitation,
    19             Business Route 422 and SR 422 from
    20             Cascade Street to Butler County Line,
    21             Shenango, Slippery Rock and Union
    22             Townships, City of New Castle               3,965,000
    23             (Base Project Allocation - $3,965,000)
    24         (23)  SR 60, Interstate Maintenance,
    25             Concrete Rehabilitation,
    26             Reconstruction, SR 60 from Mercer
    27             County Line to Mitchell Road,
    28             Neshannock, Pulaski and Wilmington
    29             Townships                                   1,626,000
    30             (Base Project Allocation - $1,470,000)
    20080S1504B2454                 - 83 -     

     1             (Design and Contingencies - $156,000)
     2         (24)  SR 60, Interstate Maintenance,
     3             Concrete Rehabilitation,
     4             Reconstruction, SR 60 from Mitchell
     5             Road to SR 422, Neshannock and Union
     6             Townships                                   1,750,000
     7             (Base Project Allocation - $1,656,000)
     8             (Design and Contingencies - $94,000)
     9         (25)  SR 79, Interstate Maintenance,
    10             Restoration and Rehabilitation I-79
    11             Corridor, Plain Grove Township              1,575,000
    12             (Base Project Allocation - $1,500,000)
    13             (Design and Contingencies - $75,000)
    14         (26)  I-79, Interstate Restoration and
    15             Reconstruction                              5,100,000
    16             (Base Project Allocation - $5,100,000)
    17         (27)  Various, Slides Correction, Retaining
    18             Walls                                          60,000
    19             (Land Allocation - $60,000)
    20         (28)  Various, Existing Signal Improvement         20,000
    21             (Land Allocation - $20,000)
    22         (29)  SR 501, CONSTRUCTION OF CENTER LEFT                  <--
    23             TURN LANE AND NEWPORT ROAD
    24             CONSTRUCTION                                1,736,000
    25             (BASE PROJECT ALLOCATION - $1,550,000)
    26             (DESIGN AND CONTINGENCIES - $186,000)
    27  Section 338.  Lebanon County.
    28     Projects are as follows:
    29         (1)  SR 422, Congested Corridor Improvement
    30             Program, Add Turning Lane, Signal
    20080S1504B2454                 - 84 -     

     1             Improvement, Pedestrian Facilities, SR
     2             422 Corridor, Palmyra Borough to Cleona
     3             Borough, Various Municipalities               620,000
     4             (Base Project Allocation - $500,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $100,000)
     7         (2)  I-78, Interstate Restoration and
     8             Reconstruction                              8,000,000
     9             (Base Project Allocation - $8,000,000)
    10         (3)  I-81, Interstate Restoration and
    11             Reconstruction                             15,100,000
    12             (Base Project Allocation - $15,100,000)
    13         (4)  SR 443, Base and Pavement Restoration
    14             and Rehabilitation, Preventive
    15             Maintenance on Substructure of Three
    16             Bridges                                     3,025,000
    17             (Base Project Allocation - $2,720,000)
    18             (Land Allocation - $275,000)
    19             (Design and Contingencies - $30,000)
    20  Section 339.  Lehigh County.
    21     Projects are as follows:
    22         (1)  SR 1004, Foot Drainage Study, Lehigh
    23             Avenue Retaining Wall, Whitehall
    24             Township                                      450,000
    25             (Base Project Allocation - $100,000)
    26             (Land Allocation - $100,000)
    27             (Design and Contingencies - $250,000)
    28         (2)  SR 145, Excavate Rock, Shoulder,
    29             Correct Drainage, Safety Improvement,
    30             SR 145, Segment 260 and Segment 270,
    20080S1504B2454                 - 85 -     

     1             North Whitehall Township                      400,000
     2             (Base Project Allocation - $100,000)
     3             (Land Allocation - $50,000)
     4             (Design and Contingencies - $250,000)
     5         (3)  SR 222, Signalization, Safety
     6             Improvement, SR 222 and Shantz Road
     7             Intersection, Upper Macungie Township         340,000
     8             (Base Project Allocation - $100,000)
     9             (Land Allocation - $40,000)
    10             (Design and Contingencies - $200,000)
    11         (4)  SR 29, Congested Corridor Improvement
    12             Program, Corridor Safety Improvement,
    13             Cedar Crest Boulevard Corridor from I-
    14             78 to Chestnut Street, Various
    15             Municipalities                                475,000
    16             (Base Project Allocation - $300,000)
    17             (Land Allocation - $75,000)
    18             (Design and Contingencies - $100,000)
    19         (5)  SR 4003, Replace Headwalls, Concrete
    20             Gutter Regrading and Set Back, Safety
    21             Improvement, Kernsville Road at Jordan
    22             Road, North Whitehall Township                310,000
    23             (Base Project Allocation - $100,000)
    24             (Land Allocation - $40,000)
    25             (Design and Contingencies - $170,000)
    26         (6)  SR 78, Provide Roaming Service Patrol,
    27             Safety Improvement, SR 78 from SR 100
    28             to SR 309/145 and along SR 22 from I-78
    29             to SR 33, Various Municipalities              180,000
    30             (Base Project Allocation - $180,000)
    20080S1504B2454                 - 86 -     

     1         (7)  SR 22, Install Dynamic Message Signs,
     2             I-78 and SR 22 Corridors, Various
     3             Municipalities                                390,000
     4             (Base Project Allocation - $95,000)
     5             (Land Allocation - $15,000)
     6             (Design and Contingencies - $280,000)
     7         (8)  SR 22, Installation of Highway
     8             Advisory Radio Beacons, I-78 and SR 22
     9             Corridors, Various Municipalities             300,000
    10             (Base Project Allocation - $100,000)
    11             (Land Allocation - $15,000)
    12             (Design and Contingencies - $185,000)
    13         (9)  SR 22, Replace 27 Existing Queue
    14             Detectors with Passive Acoustic
    15             Sensors, SR 22, I-78 and SR 33
    16             Corridors, Various Municipalities             617,000
    17             (Base Project Allocation - $100,000)
    18             (Design and Contingencies - $517,000)
    19         (10)  SR 78, Replacement of Precast
    20             Parapets, Various Locations on SR 78,
    21             SR 22, SR 863, SR 873 and SR 3007,
    22             Various Municipalities                      2,690,000
    23             (Base Project Allocation - $150,000)
    24             (Land Allocation - $40,000)
    25             (Design and Contingencies - $2,500,000)
    26         (11)  SR 78, Install Median Guide Rail,
    27             Safety Improvement, I-78 Various
    28             Locations, Various Municipalities             725,000
    29             (Base Project Allocation - $100,000)
    30             (Design and Contingencies - $625,000)
    20080S1504B2454                 - 87 -     

     1         (12)  SR 78, Install Closed Circuit
     2             Television Cameras, I-78 and SR 33
     3             Corridors, Various Municipalities             265,000
     4             (Base Project Allocation - $125,000)
     5             (Land Allocation - $15,000)
     6             (Design and Contingencies - $125,000)
     7         (13)  I-78, Interstate Restoration and
     8             Reconstruction                             19,220,000
     9             (Base Project Allocation - $19,220,000)
    10         (14)  SR 309, Widen to Incorporate Left
    11             Turn Lanes at Signalized Intersections,
    12             Median Barrier, Crosswalks and Sidewalk
    13             Improvements                                  336,000
    14             (Base Project Allocation - $336,000)
    15  Section 340.  Luzerne County.
    16     Projects are as follows:
    17         (1)  SR 11, Intersection Improvement, SR 11
    18             and SR 29 Intersection, Plymouth
    19             Township                                       29,000
    20             (Base Project Allocation - $10,000)
    21             (Land Allocation - $4,000)
    22             (Design and Contingencies - $15,000)
    23         (2)  SR 115, Install Rock Fence, Safety
    24             Improvement, PA 115 from Truck Escape
    25             Ramp to East Mountain Boulevard, Plains
    26             Township                                      675,000
    27             (Base Project Allocation - $600,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $25,000)
    30         (3)  SR 2029, Remove Existing Abandoned
    20080S1504B2454                 - 88 -     

     1             Railroad Bridge Abutments, Safety
     2             Improvement, Abutment Removal, York
     3             Avenue and Wood Street, Duryea Borough         26,000
     4             (Base Project Allocation - $18,000)
     5             (Land Allocation - $8,000)
     6         (4)  SR 2032, Remove Existing Abandoned
     7             Railroad Bridge Abutments, Safety
     8             Improvement, Near the Intersection of
     9             SR 2030 and SR 2032, Duryea and
    10             Hughestown Boroughs                            19,000
    11             (Base Project Allocation - $19,000)
    12         (5)  SR 309, Install Rock Fence, Safety
    13             Improvement, PA 309, Brown Street, T-
    14             433, to Pine Run Road, SR 2034,
    15             Fairview and Hanover Townships                640,000
    16             (Base Project Allocation - $640,000)
    17         (6)  SR 80, SR 81, SR 309, ITS Improvements
    18             and Purchases, I-80 Corridor, I-81
    19             Corridor and PA 309 Corridor, Various
    20             Municipalities                                700,000
    21             (Base Project Allocation - $600,000)
    22             (Design and Contingencies - $100,000)
    23         (7)  South Valley Parkway connecting PA
    24             Route 29 to Kirmar Parkway, Nanticoke,
    25             Hanover and Newport Townships              65,000,000
    26             (Base Project Allocation - $65,000,000)
    27         (8)  I-80, Interstate Restoration and
    28             Reconstruction                             25,300,000
    29             (Base Project Allocation - $25,300,000)
    30         (9)  I-81, Interstate Restoration and
    20080S1504B2454                 - 89 -     

     1             Reconstruction                             39,100,000
     2             (Base Project Allocation - $39,100,000)
     3         (10)  New Road, New Access Road                 3,570,000
     4             (Base Project Allocation - $3,570,000)
     5         (11)  SR 3046, South Valley Parkway, New
     6             Two-Lane Roadway, New Interchange with
     7             Route 29, Bridge Replacement, SR 2008,
     8             Middle Road over Route 29 and Bridge        1,755,000
     9             (Land Allocation - $1,404,000)
    10             (Design and Contingencies - $351,000)
    11         (12)  SR 115, Interchange Safety
    12             Improvement                                 2,662,000
    13             (Base Project Allocation - $1,622,000)
    14             (Land Allocation - $1,040,000)
    15         (13)  SR 239, Restoration                          87,000
    16             (Land Allocation - $87,000)
    17         (14)  SR 6039, Corridor Safety Improvement,
    18             Signals and Widening                          267,000
    19             (Base Project Allocation - $267,000)
    20         (15)  SR 924, Restoration and Widening Two
    21             Lanes to Five Lanes                         3,031,000
    22             (Base Project Allocation - $3,031,000)
    23         (16)  SR 924, Restoration and Widening          1,831,000
    24             (Base Project Allocation - $1,831,000)
    25         (17)  SR 93, Restoration and Widening           3,516,000
    26             (Base Project Allocation - $3,516,000)
    27         (18)  SR 2029, Abutment Removal                     8,000
    28             (Land Allocation - $8,000)
    29         (19)  SR 2032, Abutment Removal                     4,000
    30             (Base Project Allocation - $4,000)
    20080S1504B2454                 - 90 -     

     1         (20)  SR 309, Install Rock Fence                  640,000
     2             (Base Project Allocation - $640,000)
     3         (21)  SR 309, Restoration, Roadway and
     4             Retaining Wall                                430,000
     5             (Base Project Allocation - $430,000)
     6  Section 341.  Lycoming County.
     7     Projects are as follows:
     8         (1)  SR 15, Safety Improvement, Center Turn
     9             Lane US 15 from SR 54 to South
    10             Williamsport, Armstrong and Clinton
    11             Townships                                      80,000
    12             (Base Project Allocation - $60,000)
    13             (Design and Contingencies - $20,000)
    14         (2)  SR 15, Highway Reconstruction, SR 15-
    15             A10 Section, Northbound, Segment 1350
    16             to Segment 1390, Lycoming and Old
    17             Lycoming Townships                            680,000
    18             (Base Project Allocation - $680,000)
    19         (3)  SR 15, Resurface, Reconstruct
    20             Concrete, SR 15-A10 Section,
    21             Southbound, Segment 1301 to Segment
    22             1391, Lycoming and Old Lycoming
    23             Townships                                  10,000,000
    24             (Base Project Allocation - $10,000,000)
    25         (4)  SR 15, Restoration, Reconstruct
    26             Concrete, SR 15-A10 Section,
    27             Northbound, Segment 1300 to Segment
    28             1350, Old Lycoming Township                 5,835,000
    29             (Base Project Allocation - $5,400,000)
    30             (Design and Contingencies - $435,000)
    20080S1504B2454                 - 91 -     

     1         (5)  SR 2014, Reconstruction, Broad Street
     2             from Loyalsock Creek to Montour Street,
     3             Montoursville Borough                         370,000
     4             (Base Project Allocation - $350,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $10,000)
     7         (6)  SR 220, Build Loons, Safety
     8             Improvement, SR 0220 from Segment 0200
     9             to Segment 0221, Woodward Township             50,000
    10             (Base Project Allocation - $50,000)
    11         (7)  US 15, Reconstruction, US 15, PA 220
    12             Ramp, City of Williamsport                    420,000
    13             (Base Project Allocation - $400,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $10,000)
    16         (8)  I-180, Interstate Restoration and
    17             Reconstruction                             19,000,000
    18             (Base Project Allocation - $19,000,000)
    19         (9)  SR 118, Intersection Improvement             520,000
    20             (Base Project Allocation - $520,000)
    21         (10)  SR 15, Highway Restoration                2,270,000
    22             (Base Project Allocation - $2,000,000)
    23             (Land Allocation - $270,000)
    24         (11)  SR 15, Highway Restoration                3,670,000
    25             (Base Project Allocation - $3,400,000)
    26             (Land Allocation - $270,000)
    27         (12)  SR 15, Highway Restoration                5,835,000
    28             (Base Project Allocation - $5,400,000)
    29             (Land Allocation - $435,000)
    30         (13)  SR 2014, Resurfacing and Restoration        660,000
    20080S1504B2454                 - 92 -     

     1             (Base Project Allocation - $650,000)
     2             (Land Allocation - $10,000)
     3         (14)  SR 2039, Retaining Wall and
     4             Restoration                                   640,000
     5             (Base Project Allocation - $550,000)
     6             (Land Allocation - $50,000)
     7             (Design and Contingencies - $40,000)
     8         (15)  SR 2060, Resurfacing and Restoration         63,000
     9             (Base Project Allocation - $53,000)
    10             (Land Allocation - $10,000)
    11         (16)  SR 220, Resurfacing and Restoration         535,000
    12             (Base Project Allocation - $525,000)
    13             (Land Allocation - $10,000)
    14         (17)  SR 220, Safety Improvement, Widening
    15             and Construct Loon                            119,000
    16             (Base Project Allocation - $50,000)
    17             (Land Allocation - $54,000)
    18             (Design and Contingencies - $15,000)
    19         (18)  SR 3027, Resurfacing and Restoration         70,000
    20             (Base Project Allocation - $60,000)
    21             (Land Allocation - $10,000)
    22         (19)  SR 3028, Resurfacing and Restoration        367,000
    23             (Base Project Allocation - $357,000)
    24             (Land Allocation - $10,000)
    25         (20)  SR 54, Resurfacing and Restoration          100,000
    26             (Base Project Allocation - $90,000)
    27             (Land Allocation - $10,000)
    28         (21)  SR 654, Resurfacing and Restoration         980,000
    29             (Base Project Allocation - $970,000)
    30             (Land Allocation - $10,000)
    20080S1504B2454                 - 93 -     

     1  Section 342.  McKean County.
     2     Projects are as follows:
     3         (1)  SR 446, Highway Lighting for Safety
     4             Improvements, SR 446 Lighting between
     5             SR 155 and SR 1002, Eldred Township            35,000
     6             (Base Project Allocation - $3,000)
     7             (Land Allocation - $17,000)
     8             (Design and Contingencies - $15,000)
     9         (2)  SR 770, Sight Distance Intersection
    10             Improvements, Safety Improvements, SR
    11             770 and SR 4005 Intersection, Bradford
    12             Township                                      145,000
    13             (Base Project Allocation - $100,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $25,000)
    16  Section 343.  Mercer County.
    17     Projects are as follows:
    18         (1)  SR 208, Turn Lanes, Interchange
    19             Improvements, SR 208 at Blacktown Road,
    20             SR 2006 and at George Junior Road, SR
    21             63, Pine Township                             245,000
    22             (Base Project Allocation - $200,000)
    23             (Land Allocation - $15,000)
    24             (Design and Contingencies - $30,000)
    25         (2)  SR 18, Relocation of East Lake Road
    26             from Intersection with SR 18,
    27             Pymatuning Township                         3,450,000
    28             (Base Project Allocation - $2,500,000)
    29             (Land Allocation - $150,000)
    30             (Design and Contingencies - $800,000)
    20080S1504B2454                 - 94 -     

     1         (3)  Reconstruction and Subsidence
     2             Prevention Construction, East Lake
     3             Road, from PA 18 for 0.2 miles,
     4             Pymatuning Township                         3,550,000
     5             (Base Project Allocation - $2,500,000)
     6             (Land Allocation - $250,000)
     7             (Design and Contingencies - $800,000)
     8         (4)  I-80, Interstate Restoration and
     9             Reconstruction                             27,000,000
    10             (Base Project Allocation - $27,000,000)
    11         (5)  I-79, Interstate Restoration and
    12             Reconstruction                             25,500,000
    13             (Base Project Allocation - $25,500,000)
    14         (6)  SR 60, Phase 2, Restoration,
    15             Rehabilitation and Upgrading Existing
    16             Signals                                     2,476,000
    17             (Base Project Allocation - $1,200,000)
    18             (Design and Contingencies - $1,276,000)
    19         (7)  SR 60, Safety Improvement,
    20             Reconstruction for Turning Lane,
    21             Intersection Improvements, Roadway
    22             Resurfacing, Update of Traffic Signals      2,819,000
    23             (Base Project Allocation - $1,839,000)
    24             (Land Allocation - $260,000)
    25             (Design and Contingencies - $720,000)
    26         (8)  EAST LAKE ROAD, RECONSTRUCTION AND                    <--
    27             SUBSIDENCE PREVENTION, 0.2 MILES,
    28             PYMATUNING TOWNSHIP                         3,550,000
    29             (BASE PROJECT ALLOCATION - $2,500,000)
    30             (LAND ALLOCATION - $250,000)
    20080S1504B2454                 - 95 -     

     1             (DESIGN AND CONTINGENCIES - $800,000)
     2  Section 344.  Mifflin County (Reserved).
     3  Section 345.  Monroe County.
     4     Projects are as follows:
     5         (1)  SR 33, Installation of Median Barrier,
     6             SR 33 Median Barrier South Section,
     7             Segment 0130 to Segment 0181, Hamilton
     8             Township                                      870,000
     9             (Base Project Allocation - $60,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $800,000)
    12         (2)  SR 33, Installation of Median Barrier,
    13             Safety Improvement, SR 33 Median
    14             Barrier, South Section, Segment 0010 to
    15             Segment 0100, Hamilton and Ross
    16             Townships                                     550,000
    17             (Base Project Allocation - $40,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $500,000)
    20         (3)  SR 80, Replacement of Precast
    21             Parapets, Bridges with Hoan-Like
    22             Details, Group A, I-80, Segment 2931
    23             and Segment 2935, Various
    24             Municipalities                              1,120,000
    25             (Base Project Allocation - $100,000)
    26             (Design and Contingencies - $1,020,000)
    27         (4)  SR 80, Replacement of Precast
    28             Parapets, Bridges with Hoan-Like
    29             Details, Group B, I-80, Segment 2974,
    30             Various Municipalities                      2,543,000
    20080S1504B2454                 - 96 -     

     1             (Base Project Allocation - $200,000)
     2             (Design and Contingencies - $2,343,000)
     3         (5)  SR 80, Replacement of Precast
     4             Parapets, Bridges with Hoan-Like
     5             Details, Group C, I-80, Segment 3044
     6             and Segment 3050, Various
     7             Municipalities                              2,134,000
     8             (Base Project Allocation - $80,000)
     9             (Design and Contingencies - $2,054,000)
    10         (6)  SR 80, Install Dynamic Message Signs
    11             and Closed Circuit Television Cameras,
    12             I-80 Corridor, Round 1, Various
    13             Municipalities                                300,000
    14             (Base Project Allocation - $150,000)
    15             (Design and Contingencies - $150,000)
    16         (7)  SR 80, Install Dynamic Message Signs
    17             and Closed Circuit Television Cameras,
    18             I-80 Corridor, Round 2, Various
    19             Municipalities                                330,000
    20             (Base Project Allocation - $150,000)
    21             (Design and Contingencies - $180,000)
    22         (8)  SR 80, Install Dynamic Message Signs,
    23             Closed Circuit Television Cameras,
    24             Highway Advisory Radio and Highway
    25             Advisory Radio Beacons, I-80 and I-380
    26             Corridors, Various Municipalities             345,000
    27             (Base Project Allocation - $65,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $270,000)
    30         (9)  SR 80, Install Dynamic Message Signs
    20080S1504B2454                 - 97 -     

     1             and Closed Circuit Television Cameras,
     2             I-80 and I-380 Corridors, Round 4,
     3             Various Municipalities                        320,000
     4             (Base Project Allocation - $175,000)
     5             (Design and Contingencies - $145,000)
     6         (10)  SR 80, Install Dynamic Message Signs,
     7             I-80 and I-380 Corridors, Round 5,
     8             Various Municipalities                        300,000
     9             (Base Project Allocation - $150,000)
    10             (Land Allocation - $45,000)
    11             (Design and Contingencies - $105,000)
    12         (11)  SR 447, Signalization and
    13             Construction of Dedicated Turning
    14             Lanes, SR 447 and Brushy Mountain Road,
    15             Stroud Township                             1,500,000
    16             (Base Project Allocation - $1,500,000)
    17         (12)  I-380, Interstate Restoration and
    18             Reconstruction                             13,100,000
    19             (Base Project Allocation - $13,100,000)
    20         (13)  I-80, Interstate Restoration and
    21             Reconstruction                             27,300,000
    22             (Base Project Allocation - $27,300,000)
    23         (14)  SR 611, Intersection Improvement,
    24             Realignment, Construct a Connector Road
    25             to Connect SR 196 to SR 611                   476,000
    26             (Base Project Allocation - $361,000)
    27             (Design and Contingencies - $115,000)
    28         (15)  SR 33, Median Barrier Installation          763,000
    29             (Base Project Allocation - $500,000)
    30             (Land Allocation - $243,000)
    20080S1504B2454                 - 98 -     

     1             (Design and Contingencies - $20,000)
     2         (16)  SR 447 AND BRUSHY MOUNTAIN ROAD,                     <--
     3             SIGNALIZATION AND CONSTRUCTION, TURNING
     4             LANES, STROUD TOWNSHIP                      1,500,000
     5             (BASE PROJECT ALLOCATION - $1,500,000)
     6  Section 346.  Montgomery County.
     7     Projects are as follows:
     8         (1)  SR 1012, Widening of Approaches to
     9             Provide Left and Right Turn Lanes and
    10             Intersection Improvements, Lower Road
    11             from Allentown Road to Intersections at
    12             Cowpath Road and Intersections at SR
    13             1012, Godshall Road, Franconia
    14             Township                                      400,000
    15             (Base Project Allocation - $400,000)
    16         (2)  SR 202, Reconstruction and Widening,
    17             US 202, Hancock Road to PA 309, No.1,
    18             Lower Gwynedd, Montgomery and Upper
    19             Gwynedd Townships                           6,702,000
    20             (Base Project Allocation - $5,900,000)
    21             (Land Allocation - $802,000)
    22         (3)  SR 23, Construct Four-Lane Controlled
    23             Access Highway, Approximately 3.5 Miles
    24             in Length, SR 23 Between US 422 and
    25             Dekalb Pike, US 202, Upper Merion
    26             Township                                   11,100,000
    27             (Base Project Allocation - $10,000,000)
    28             (Land Allocation - $500,000)
    29             (Design and Contingencies - $600,000)
    30         (4)  SR 3001, Relocation, Realignment,
    20080S1504B2454                 - 99 -     

     1             Norristown Road at Stenton Avenue and
     2             Narcissa Road, Whitpain Township              200,000
     3             (Base Project Allocation - $200,000)
     4         (5)  SR 3029, Road Widening, I-76
     5             Intersection and Henderson Road, Upper
     6             Merion Township                             2,920,000
     7             (Base Project Allocation - $2,000,000)
     8             (Land Allocation - $400,000)
     9             (Design and Contingencies - $520,000)
    10         (6)  SR 4028, Realignment and Widening to
    11             Soften Curve, SR 4028, Pleasant View
    12             Road, Lower Pottsgrove Township               120,000
    13             (Base Project Allocation - $120,000)
    14         (7)  SR 422, Corridor Safety Improvement,
    15             US 422 Interim Improvements, Lower
    16             Providence, Montgomery, Upper Merion
    17             and West Norriton Townships                 1,025,000
    18             (Base Project Allocation - $1,000,000)
    19             (Land Allocation - $25,000)
    20         (8)  SR 476, ITS Reconstruction and
    21             Purchases, I-476 Schuylkill River
    22             Bridge Redecking, Companion Project,
    23             Conshohocken Borough and Plymouth
    24             Township                                    1,230,000
    25             (Base Project Allocation - $1,230,000)
    26         (9)  SR 476, Highway Reconstruction, I-476
    27             from Schuylkill Expressway, I-76, to
    28             Pennsylvania Turnpike, I-276,
    29             Conshohocken and West Conshohocken
    30             Boroughs, Lower Merion and Plymouth
    20080S1504B2454                 - 100 -    

     1             Townships                                 101,500,000
     2             (Base Project Allocation -
     3             $100,000,000)
     4             (Land Allocation - $1,500,000)
     5         (10)  SR 73, Corridor Safety Improvement,
     6             Intersection Improvement, PA 73 from US
     7             202 to Butler Pike, Skippack and Upper
     8             Merion Townships                              560,000
     9             (Base Project Allocation - $560,000)
    10         (11)  SR 9102, Extension, Add Lane,
    11             Lafayette Street Corridor, Norristown
    12             Borough and Upper Merion Township           9,000,000
    13             (Base Project Allocation - $9,000,000)
    14         (12)  US 202, Add Lane, Widen, Restoration,
    15             Rehabilitation, Safety Improvements, US
    16             202, Markley Street Improvement,
    17             Norristown Borough                          3,680,000
    18             (Base Project Allocation - $3,400,000)
    19             (Land Allocation - $280,000)
    20         (13)  Existing Signal Improvement, Widen,
    21             Markley Street Improvement, Harding
    22             Boulevard to Johnson Street, Norristown
    23             Borough                                     3,000,000
    24             (Base Project Allocation - $2,800,000)
    25             (Land Allocation - $200,000)
    26         (14)  I-476, Interstate Restoration and
    27             Reconstruction                              5,300,000
    28             (Base Project Allocation - $5,300,000)
    29         (15)  I-76, Interstate Restoration and
    30             Reconstruction                             11,900,000
    20080S1504B2454                 - 101 -    

     1             (Base Project Allocation - $11,900,000)
     2         (16)  PA 463, Widen to Four Lanes                 995,000
     3             (Base Project Allocation - $995,000)
     4         (17)  SR 2001, Intersection Improvement,
     5             Turn Lanes and Signals                        400,000
     6             (Base Project Allocation - $360,000)
     7             (Design and Contingencies - $40,000)
     8         (18)  SR 2027, Intersection Improvement,
     9             Traffic Signal, Align Camp Hill Road
    10             with PA Avenue, Left Turn Lanes             1,065,000
    11             (Base Project Allocation - $784,000)
    12             (Land Allocation - $187,000)
    13             (Design and Contingencies - $94,000)
    14         (19)  SR 2038, Intersection Improvement,
    15             Widen for South Bound Right Turn Lane         234,000
    16             (Base Project Allocation - $200,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $14,000)
    19         (20)  US 202, Widen, Intersection Upgrades
    20             and Structure Rehabilitation                  400,000
    21             (Land Allocation - $400,000)
    22  Section 347.  Montour County.
    23     Projects are as follows:
    24         (1)  I-80, Interstate Restoration and
    25             Reconstruction                             10,900,000
    26             (Base Project Allocation - $10,900,000)
    27         (2)  SR 11, Resurfacing and Restoration         1,290,000
    28             (Base Project Allocation - $1,280,000)
    29             (Land Allocation - $10,000)
    30         (3)  SR 11, Resurfacing and Restoration         1,290,000
    20080S1504B2454                 - 102 -    

     1             (Base Project Allocation - $1,280,000)
     2             (Land Allocation - $10,000)
     3         (4)  SR 44, Resurfacing and Restoration            10,000
     4             (Land Allocation - $10,000)
     5         (5)  SR 54, Resurfacing and Restoration            10,000
     6             (Land Allocation - $10,000)
     7         (6)  SR 54, Resurfacing and Restoration            10,000
     8             (Land Allocation - $10,000)
     9         (7)  SR 642, Resurfacing and Restoration        1,510,000
    10             (Base Project Allocation - $1,500,000)
    11             (Land Allocation - $10,000)
    12  Section 348.  Northampton County.
    13     Projects are as follows:
    14         (1)  SR 191 and SR 248, Installation of a
    15             Closed Loop System, SR 191 and SR 248
    16             Intersection, Nazareth Borough                400,000
    17             (Base Project Allocation - $55,000)
    18             (Land Allocation - $5,000)
    19             (Design and Contingencies - $340,000)
    20         (2)  SR 33, Expansion of Existing Park and
    21             Ride Facility, SR 33, Park and Ride
    22             Lot, Bethlehem Township                     5,000,000
    23             (Base Project Allocation - $100,000)
    24             (Land Allocation - $200,000)
    25             (Design and Contingencies - $4,700,000)
    26         (3)  SR 378, Ramp Reconfiguration, 412
    27             Second Street Ramp, City of Bethlehem       1,740,000
    28             (Base Project Allocation - $1,620,000)
    29             (Land Allocation - $120,000)
    30         (4)  SR 611, Corridor Management Plan to
    20080S1504B2454                 - 103 -    

     1             Preserve Scenic, Historic and Cultural
     2             Qualities, Delaware River Valley Scenic
     3             Byway, Lower Mt. Bethel and Williams
     4             Townships                                     700,000
     5             (Base Project Allocation - $115,000)
     6             (Land Allocation - $85,000)
     7             (Design and Contingencies - $500,000)
     8         (5)  SR 611, Flashing Warning Devices, Rock
     9             Excavation, Median Barrier, Retaining
    10             Wall, Shoulders, SR 611, Canal Lock
    11             Curves, Williams Township                     700,000
    12             (Base Project Allocation - $150,000)
    13             (Land Allocation - $50,000)
    14             (Design and Contingencies - $500,000)
    15         (6)  SR 611, Drainage, Remove Curbs,
    16             Shoulders, Guide Rail and Utility Pole,
    17             SR 611 Safety Improvement, Williams
    18             Township, City of Easton                      600,000
    19             (Base Project Allocation - $150,000)
    20             (Land Allocation - $50,000)
    21             (Design and Contingencies - $400,000)
    22         (7)  SR 33 and SR 1002, Palmer Township
    23             Interchange, Palmer Township               23,000,000
    24             (Base Project Allocation - $23,000,000)
    25         (8)  I-78, Interstate Restoration and
    26             Reconstruction                             11,900,000
    27             (Base Project Allocation - $11,900,000)
    28         (9)  SR 378, Convert Traffic Flow One Way
    29             and Two Way                                   500,000
    30             (Base Project Allocation - $500,000)
    20080S1504B2454                 - 104 -    

     1         (10)  SR 412, Park and Ride Lot, Intermodal
     2             Services                                      167,000
     3             (Base Project Allocation - $167,000)
     4         (11)  SR 378, Relocate and Widen the Ramp       1,740,000
     5             (Base Project Allocation - $1,620,000)
     6             (Design and Contingencies - $120,000)
     7  Section 349.  Northumberland County.
     8     Projects are as follows:
     9         (1)  SR 4012, Resurface, Rehabilitation, SR
    10             4012 from Zimmerman's Hollow Road to SR
    11             487, Snydertown Borough, Ralpho,
    12             Shamokin and Upper Augusta Townships        2,500,000
    13             (Base Project Allocation - $2,500,000)
    14         (2)  SR 61, Congested Corridor Improvement
    15             Program, Corridor Safety Improvement,
    16             SR 61 from SR 890 to SR 147, Upper
    17             Augusta Township, City of Sunbury              50,000
    18             (Design and Contingencies - $50,000)
    19         (3)  I-180, Interstate Restoration and
    20             Reconstruction                              8,900,000
    21             (Base Project Allocation - $8,900,000)
    22         (4)  I-80, Interstate Restoration and
    23             Reconstruction                              5,000,000
    24             (Base Project Allocation - $5,000,000)
    25         (5)  SR 147, Resurfacing and Restoration          710,000
    26             (Base Project Allocation - $700,000)
    27             (Land Allocation - $10,000)
    28         (6)  SR 225, Resurfacing and Restoration          437,000
    29             (Base Project Allocation - $432,000)
    30             (Land Allocation - $5,000)
    20080S1504B2454                 - 105 -    

     1         (7)  SR 225, Resurfacing and Restoration          970,000
     2             (Base Project Allocation - $960,000)
     3             (Land Allocation - $10,000)
     4         (8)  SR 225, Resurfacing and Restoration        1,110,000
     5             (Base Project Allocation - $1,100,000)
     6             (Land Allocation - $10,000)
     7         (9)  SR 4006, Resurfacing and Restoration       1,107,000
     8             (Base Project Allocation - $1,097,000)
     9             (Land Allocation - $10,000)
    10         (10)  SR 54, Resurfacing and Restoration          320,000
    11             (Base Project Allocation - $310,000)
    12             (Land Allocation - $10,000)
    13         (11)  SR 54, Resurfacing and Restoration          970,000
    14             (Base Project Allocation - $960,000)
    15             (Land Allocation - $10,000)
    16         (12)  SR 61, Resurfacing and Restoration          785,000
    17             (Base Project Allocation - $775,000)
    18             (Land Allocation - $10,000)
    19  Section 350.  Perry County.
    20     Projects are as follows:
    21         (1)  SR 274, Intersection Improvement, Add
    22             Turning Lanes                                 475,000
    23             (Base Project Allocation - $475,000)
    24         (2)  SR 34, Intersection Improvement            2,420,000
    25             (Land Allocation - $920,000)
    26             (Design and Contingencies - $1,500,000)
    27  Section 351.  Philadelphia County.
    28     Projects are as follows:
    29         (1)  Signal Improvements, Congestion
    30             Reduction, 34th Street, Mantua Avenue
    20080S1504B2454                 - 106 -    

     1             to Spruce Street, City of Philadelphia        220,000
     2             (Base Project Allocation - $220,000)
     3         (2)  SR 676, Highway and Structure
     4             Replacement, Reconstruction, Vine
     5             Street Expressway, 7 Bridge Project,
     6             City of Philadelphia                        4,373,000
     7             (Base Project Allocation - $460,000)
     8             (Land Allocation - $143,000)
     9             (Design and Contingencies - $3,770,000)
    10         (3)  SR 76, Traffic System Management, I-76
    11             Regional Travel Information,
    12             Conshohocken and West Conshohocken
    13             Boroughs, Lower Merion and Upper Merion
    14             Townships and City of Philadelphia            667,000
    15             (Base Project Allocation - $417,000)
    16             (Design and Contingencies - $250,000)
    17         (4)  SR 95, Surface Street Reconstruction
    18             along with Several Ramps, Interchange
    19             Improvement and Widening, Cottman-
    20             Princeton Local Street Ramp, City of
    21             Philadelphia                                3,400,000
    22             (Base Project Allocation - $2,500,000)
    23             (Land Allocation - $900,000)
    24         (5)  SR 95, Utility Relocation, Water and
    25             Sewer, Retaining Walls, Signal
    26             Improvements and Surface Streets
    27             Reconstruction, I-95 Corridor,
    28             Wissinoming Avenue, Bleigh Avenue,
    29             Milnor Street, City of Philadelphia         2,000,000
    30             (Base Project Allocation - $1,500,000)
    20080S1504B2454                 - 107 -    

     1             (Land Allocation - $500,000)
     2         (6)  I-76, Interstate Restoration and
     3             Reconstruction                              7,500,000
     4             (Base Project Allocation - $7,500,000)
     5         (7)  I-676, Interstate Restoration and
     6             Reconstruction                              1,500,000
     7             (Base Project Allocation - $1,500,000)
     8         (8)  I-95, Interstate Restoration and
     9             Reconstruction                             21,000,000
    10             (Base Project Allocation - $21,000,000)
    11  Section 352.  Pike County.
    12     Projects are as follows:
    13         (1)  SR 2001, Restoration and
    14             Reconstruction, Milford to Bushkill
    15             No.5, Rockledge Road to SR 739 and
    16             including SR 739, Delaware Township         3,400,000
    17             (Base Project Allocation - $2,400,000)
    18             (Land Allocation - $1,000,000)
    19         (2)  SR 84, Reconstruction, I-84, Pike
    20             County, Blooming Grove and Dingman
    21             Townships                                   4,140,000
    22             (Base Project Allocation - $3,600,000)
    23             (Design and Contingencies - $540,000)
    24         (3)  SR 84, ITS Improvements and Purchases,
    25             I-84 Corridor, Various Municipalities         480,000
    26             (Base Project Allocation - $400,000)
    27             (Design and Contingencies - $80,000)
    28         (4)  I-84, Interstate Restoration and
    29             Reconstruction                             35,100,000
    30             (Base Project Allocation - $35,100,000)
    20080S1504B2454                 - 108 -    

     1         (5)  SR 739, Safety Improvement, Straighten
     2             Curve and Restoration                         109,000
     3             (Design and Contingencies - $109,000)
     4  Section 353.  Potter County.
     5     Projects are as follows:
     6         (1)  SR 6, Turn Lanes, Safety Improvement,
     7             SR 6 and SR 872, Coudersport Borough
     8             and Eulalia Township                          300,000
     9             (Base Project Allocation - $200,000)
    10             (Land Allocation - $25,000)
    11             (Design and Contingencies - $75,000)
    12  Section 354.  Schuylkill County.
    13     Projects are as follows:
    14         (1)  SR 2002, Replacement of Precast
    15             Parapets, Group D, SR 2002 Corridor,
    16             Port Carbon Borough                           320,000
    17             (Base Project Allocation - $100,000)
    18             (Design and Contingencies - $220,000)
    19         (2)  SR 61, Interim Traffic Signal, SR 61
    20             and SR 895 Intersection, Deer Lake
    21             Borough                                       300,000
    22             (Base Project Allocation - $50,000)
    23             (Land Allocation - $50,000)
    24             (Design and Contingencies - $200,000)
    25         (3)  SR 61, Upgrade Signalization, SR 61,
    26             Tunnel Road, East Norwegian Township          325,000
    27             (Base Project Allocation - $50,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $225,000)
    30         (4)  SR 61, Median Barrier Installation, SR
    20080S1504B2454                 - 109 -    

     1             61, Median Barrier, Orwigsburg Borough,
     2             North Manheim and West Brunswick
     3             Townships                                     300,000
     4             (Base Project Allocation - $50,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $240,000)
     7         (5)  SR 61, Interim Traffic Signal, SR 61,
     8             Brick Hill Road, West Brunswick
     9             Township                                      300,000
    10             (Base Project Allocation - $50,000)
    11             (Land Allocation - $50,000)
    12             (Design and Contingencies - $200,000)
    13         (6)  SR 61, Pavement Restoration,
    14             Rehabilitation, Interstate Improvement,
    15             I-81 Lebanon County Line to Pine Grove,
    16             Pine Grove Township                         1,074,000
    17             (Base Project Allocation - $840,000)
    18             (Land Allocation - $80,000)
    19             (Design and Contingencies - $154,000)
    20         (7)  SR 81, Install Dynamic Message Signs
    21             and Closed Circuit Television Cameras,
    22             I-81 Corridor, Round 1, Various
    23             Municipalities                                415,000
    24             (Base Project Allocation - $200,000)
    25             (Design and Contingencies - $215,000)
    26         (8)  SR 81, Install Dynamic Message Signs,
    27             Closed Circuit Television Cameras,
    28             Highway Advisory Radio and Highway
    29             Advisory Radio Beacons, I-81 Corridor,
    30             Round 2, Various Municipalities               315,000
    20080S1504B2454                 - 110 -    

     1             (Base Project Allocation - $65,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $240,000)
     4         (9)  SR 1006, Wade Road, Reconstruction
     5             from SR 1028 to Route 61, St. Clair
     6             Borough                                     3,000,000
     7             (Base Project Allocation - $3,000,000)
     8         (10)  I-81, Interstate Restoration and
     9             Reconstruction                             42,300,000
    10             (Base Project Allocation - $42,300,000)
    11  Section 355.  Snyder County.
    12     Projects are as follows:
    13         (1)  SR 1017, Resurfacing and Restoration       1,210,000
    14             (Base Project Allocation - $1,200,000)
    15             (Land Allocation - $10,000)
    16         (2)  SR 1023, Resurfacing and Restoration         320,000
    17             (Base Project Allocation - $310,000)
    18             (Land Allocation - $10,000)
    19         (3)  SR 104, Resurfacing and Restoration          205,000
    20             (Base Project Allocation - $200,000)
    21             (Land Allocation - $5,000)
    22         (4)  SR 2017, Resurfacing and Restoration         635,000
    23             (Base Project Allocation - $625,000)
    24             (Land Allocation - $10,000)
    25         (5)  SR 235, Resurfacing and Restoration        1,010,000
    26             (Base Project Allocation - $1,000,000)
    27             (Land Allocation - $10,000)
    28         (6)  SR 235, Resurfacing and Restoration        1,240,000
    29             (Base Project Allocation - $1,230,000)
    30             (Land Allocation - $10,000)
    20080S1504B2454                 - 111 -    

     1         (7)  SR 35, Resurfacing and Restoration         1,510,000
     2             (Base Project Allocation - $1,500,000)
     3             (Land Allocation - $10,000)
     4         (8)  SR 522, Resurfacing and Restoration        1,175,000
     5             (Base Project Allocation - $1,165,000)
     6             (Land Allocation - $10,000)
     7         (9)  SR 522, Resurfacing and Restoration           10,000
     8             (Land Allocation - $10,000)
     9         (10)  SR 522, Resurfacing and Restoration         305,000
    10             (Base Project Allocation - $300,000)
    11             (Land Allocation - $5,000)
    12  Section 356.  Somerset County.
    13     Projects are as follows:
    14         (1)  SR 219, New Four-Lane Roadway
    15             Alignment, US 219, Garrett, End of
    16             Existing Four-Lane in Somerset Township
    17             to Meyersdale Bypass in Summit
    18             Township, Brothersvalley, Somerset and
    19             Summit Townships                           36,000,000
    20             (Base Project Allocation - $27,000,000)
    21             (Land Allocation - $7,000,000)
    22             (Design and Contingencies - $2,000,000)
    23         (2)  SR 219, Paving, New Four-Lane Roadway
    24             Alignment, US 219, Garrett, End of
    25             Existing Four-Lane in Somerset Township
    26             to Meyersdale Bypass in Summit
    27             Township, Brothersvalley, Somerset and
    28             Summit Townships                           14,000,000
    29             (Base Project Allocation - $14,000,000)
    30         (3)  SR 219, Construction, New Four-Lane
    20080S1504B2454                 - 112 -    

     1             Alignment, US 219, Garrett, End of
     2             Existing Four-Lane in Somerset Township
     3             to Meyersdale Bypass in Summit
     4             Township, Brothersvalley, Somerset and
     5             Summit Townships                           20,000,000
     6             (Base Project Allocation - $20,000,000)
     7         (4)  SR 219, New Four-Lane Roadway
     8             Alignment, US 219, I-68, Maryland to
     9             Meyersdale Bypass, Salisbury Borough,
    10             Elk Lick and Summit Townships              51,000,000
    11             (Base Project Allocation - $40,000,000)
    12             (Land Allocation - $6,000,000)
    13             (Design and Contingencies - $5,000,000)
    14         (5)  SR 3029, Reconstruction, Ream Road, T-
    15             362, Intersection to Seven Springs
    16             Borough Line, Seven Springs Borough,
    17             Middlecreek and Milford Townships           7,450,000
    18             (Base Project Allocation - $6,600,000)
    19             (Land Allocation - $550,000)
    20             (Design and Contingencies - $300,000)
    21         (6)  PA 160, Safety Improvement,
    22             Construction of a Runaway Truck Ramp          772,000
    23             (Base Project Allocation - $270,000)
    24             (Land Allocation - $387,000)
    25             (Design and Contingencies - $115,000)
    26         (7)  PA 281, Intersection Improvement             755,000
    27             (Base Project Allocation - $370,000)
    28             (Land Allocation - $200,000)
    29             (Design and Contingencies - $185,000)
    30         (8)  SR 3041, Intersection Improvement,
    20080S1504B2454                 - 113 -    

     1             Construction of Left Turn Lanes and
     2             Increasing the Roadway Curve Radius           301,000
     3             (Base Project Allocation - $216,000)
     4             (Land Allocation - $85,000)
     5         (9)  SR 3010, Highway Restoration                 574,000
     6             (Base Project Allocation - $574,000)
     7         (10)  SR 3037, Overlay and Intersection
     8             Improvement                                 2,300,000
     9             (Base Project Allocation - $2,300,000)
    10  Section 357.  Sullivan County.
    11     Projects are as follows:
    12         (1)  SR 1015, Widen and Resurface, SR 1015
    13             from SR 87 to Bradford County Line,
    14             Cherry Township                               422,000
    15             (Base Project Allocation - $404,000)
    16             (Design and Contingencies - $18,000)
    17         (2)  SR 220, Reconstruct to 24-Foot, Two-
    18             Lane Highway                                1,460,000
    19             (Base Project Allocation - $1,456,000)
    20             (Design and Contingencies - $4,000)
    21         (3)  SR 220, Resurfacing and Restoration           10,000
    22             (Land Allocation - $10,000)
    23         (4)  SR 220, Resurfacing and Restoration           25,000
    24             (Land Allocation - $25,000)
    25         (5)  SR 42, Resurfacing and Restoration            25,000
    26             (Land Allocation - $25,000)
    27         (6)  SR 87, Resurfacing and Restoration            43,000
    28             (Base Project Allocation - $3,000)
    29             (Land Allocation - $40,000)
    30  Section 358.  Susquehanna County.
    20080S1504B2454                 - 114 -    

     1     Projects are as follows:
     2         (1)  SR 81, ITS Improvements and Purchases,
     3             I-81 Corridor, Various Municipalities         480,000
     4             (Base Project Allocation - $400,000)
     5             (Design and Contingencies - $80,000)
     6         (2)  SR 2030, Remove Existing Concrete
     7             Railroad Bridge Abutments                     152,000
     8             (Base Project Allocation - $152,000)
     9         (3)  I-81, Interstate Restoration and
    10             Reconstruction                             26,500,000
    11             (Base Project Allocation - $26,500,000)
    12         (4)  SR 92, Intersection Improvement              380,000
    13             (Base Project Allocation - $380,000)
    14         (5)  SR 81, Interchange Improvement, Ramp
    15             Redesign                                      368,000
    16             (Base Project Allocation - $100,000)
    17             (Land Allocation - $208,000)
    18             (Design and Contingencies - $60,000)
    19         (6)  SR 1033, Roadway and Slope Repair            276,000
    20             (Base Project Allocation - $250,000)
    21             (Land Allocation - $20,000)
    22             (Design and Contingencies - $6,000)
    23         (7)  SR 247, Highway Restoration                  336,000
    24             (Base Project Allocation - $336,000)
    25         (8)  SR 267, Roadway and Slope Repair             829,000
    26             (Base Project Allocation - $805,000)
    27             (Design and Contingencies - $24,000)
    28         (9)  SR 29, Restoration, Roadway and Slope
    29             Repair                                        420,000
    30             (Base Project Allocation - $360,000)
    20080S1504B2454                 - 115 -    

     1             (Land Allocation - $50,000)
     2             (Design and Contingencies - $10,000)
     3         (10)  SR 3023, Roadway and Slope Repair           518,000
     4             (Base Project Allocation - $518,000)
     5  Section 359.  Tioga County.
     6     Projects are as follows:
     7         (1)  SR 2005, Slide Repair and Slides
     8             Correction, SR 2005, Segment 0530,
     9             Mansfield Borough, Richmond Township          980,000
    10             (Base Project Allocation - $840,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $120,000)
    13         (2)  SR 15, Study to Determine Needs of
    14             Roadway Signing as I-99                       250,000
    15             (Land Allocation - $250,000)
    16         (3)  SR 15, Resurfacing and Restoration         1,441,000
    17             (Base Project Allocation - $1,375,000)
    18             (Land Allocation - $66,000)
    19         (4)  SR 15, Highway Restoration                    50,000
    20             (Land Allocation - $50,000)
    21         (5)  SR 2005, Resurfacing and Restoration       2,037,000
    22             (Base Project Allocation - $1,940,000)
    23             (Land Allocation - $97,000)
    24         (6)  SR 287, Resurfacing and Restoration          480,000
    25             (Base Project Allocation - $470,000)
    26             (Land Allocation - $10,000)
    27         (7)  SR 287, Resurfacing and Restoration          380,000
    28             (Base Project Allocation - $370,000)
    29             (Land Allocation - $10,000)
    30         (8)  SR 3019, Resurfacing and Restoration       1,426,000
    20080S1504B2454                 - 116 -    

     1             (Base Project Allocation - $1,360,000)
     2             (Land Allocation - $66,000)
     3         (9)  SR 4024, Resurfacing and Restoration       2,118,000
     4             (Base Project Allocation - $2,027,000)
     5             (Land Allocation - $91,000)
     6         (10)  SR 6, Resurfacing and Restoration           735,000
     7             (Base Project Allocation - $701,000)
     8             (Land Allocation - $34,000)
     9         (11)  SR 6, Resurfacing and Restoration         2,020,000
    10             (Base Project Allocation - $2,000,000)
    11             (Land Allocation - $20,000)
    12  Section 360.  Union County.
    13     Projects are as follows:
    14         (1)  SR 1004, Safety Improvement, SR 1004
    15             from Manning Road to JPM Road, Kelly
    16             Township                                      119,000
    17             (Base Project Allocation - $87,000)
    18             (Land Allocation - $22,000)
    19             (Design and Contingencies - $10,000)
    20         (2)  I-80, Interstate Restoration and
    21             Reconstruction                             16,000,000
    22             (Base Project Allocation - $16,000,000)
    23         (3)  SR 192, Resurfacing and Restoration          910,000
    24             (Base Project Allocation - $900,000)
    25             (Land Allocation - $10,000)
    26         (4)  SR 235, Resurfacing and Restoration        1,610,000
    27             (Base Project Allocation - $1,600,000)
    28             (Land Allocation - $10,000)
    29         (5)  SR 45, Resurfacing and Restoration         1,310,000
    30             (Base Project Allocation - $1,300,000)
    20080S1504B2454                 - 117 -    

     1             (Land Allocation - $10,000)
     2         (6)  SR 45, Resurfacing and Restoration         1,760,000
     3             (Base Project Allocation - $1,750,000)
     4             (Land Allocation - $10,000)
     5         (7)  SR 45, Highway Reconstruction              3,150,000
     6             (Base Project Allocation - $3,000,000)
     7             (Land Allocation - $150,000)
     8  Section 361.  Venango County.
     9     Projects are as follows:
    10         (1)  Wetland Banking, Design, Construct and
    11             Monitor Wetlands, Phase II, Polk
    12             Wetlands Site, Sandycreek Township            430,000
    13             (Base Project Allocation - $250,000)
    14             (Land Allocation - $50,000)
    15             (Design and Contingencies - $130,000)
    16         (2)  Various Routes, Traffic Signal Program
    17             for 2009, Safety Improvements,
    18             Countywide, Various Municipalities             50,000
    19             (Base Project Allocation - $50,000)
    20         (3)  Various Routes, Countywide Traffic
    21             Signal Program for 2010, Safety
    22             Improvements, Countywide, Various
    23             Municipalities                                 50,000
    24             (Base Project Allocation - $50,000)
    25         (4)  I-80, Interstate Restoration and
    26             Reconstruction                             14,300,000
    27             (Base Project Allocation - $14,300,000)
    28         (5)  SR 417, Highway Restoration                1,563,000
    29             (Base Project Allocation - $1,563,000)
    30  Section 362.  Warren County.
    20080S1504B2454                 - 118 -    

     1     Projects are as follows:
     2         (1)  SR 62, Turning Lane, Existing Signal
     3             Improvement, SR 62 from SR 1008, Hatch
     4             Run Road, to New York Line, Conewango
     5             and Pine Grove Townships                      630,000
     6             (Base Project Allocation - $500,000)
     7             (Land Allocation - $30,000)
     8             (Design and Contingencies - $100,000)
     9  Section 363.  Washington County.
    10     Projects are as follows:
    11         (1)  SR 1009, Intersection Improvement, SR
    12             1009, Pike Street, and SR 4049, Country
    13             Club Road, Chartiers Township               1,325,000
    14             (Base Project Allocation - $300,000)
    15             (Land Allocation - $500,000)
    16             (Design and Contingencies - $525,000)
    17         (2)  SR 18, Highway Restoration, Atlasburg
    18             to Four Lanes, Burgettstown,
    19             Burgettstown Borough and Smith
    20             Township                                      156,000
    21             (Land Allocation - $1,000)
    22             (Design and Contingencies - $155,000)
    23         (3)  SR 18, Approaches and Intersection
    24             Improvement, PA 18 at Tylerdale,
    25             Jefferson and Wylie Intersection, City
    26             of Washington                               1,190,000
    27             (Base Project Allocation - $1,000,000)
    28             (Land Allocation - $100,000)
    29             (Design and Contingencies - $90,000)
    30         (4)  SR 19, Highway Restoration, US 19 from
    20080S1504B2454                 - 119 -    

     1             Conklin Road to PA 519, North Strabane
     2             Township                                       97,000
     3             (Land Allocation - $1,000)
     4             (Design and Contingencies - $96,000)
     5         (5)  SR 19, Intersection Improvement,
     6             Intersection SR 19 and Glenncannon
     7             Drive, North Strabane Township                100,000
     8             (Base Project Allocation - $100,000)
     9         (6)  SR 40, Highway Restoration, SR 4,
    10             Segment 0670 from Beallsville to
    11             Centerville, Centerville Borough, West
    12             Pike Run Township                           6,000,000
    13             (Base Project Allocation - $6,000,000)
    14         (7)  SR 519, Highway Restoration, PA 519
    15             from US 40 to I-70, Betterment, North
    16             Bethlehem and Somerset Townships              147,000
    17             (Land Allocation - $1,000)
    18             (Design and Contingencies - $146,000)
    19         (8)  SR 70, Reconstruction, I-70, Segment
    20             0040 to Segment 0100 and Segment 0041
    21             to Segment 0101, Claysville Borough,
    22             Buffalo and Donegal Townships               2,710,000
    23             (Base Project Allocation - $2,410,000)
    24             (Design and Contingencies - $300,000)
    25         (9)  SR 70, Restoration, I-70, Segment 0214
    26             to Segment 0305, Somerset and South
    27             Strabane Townships                            775,000
    28             (Base Project Allocation - $775,000)
    29         (10)  SR 70, Interstate Restoration,
    30             Rehabilitation and Repair on
    20080S1504B2454                 - 120 -    

     1             Substructures of 3 Bridges, I-70,
     2             Segment 0180 to Segment 0215, South
     3             Strabane Township                             480,000
     4             (Base Project Allocation - $480,000)
     5         (11)  Various Routes, Miscellaneous ITS
     6             Improvements and Purchases, Countywide,
     7             Various Municipalities                        115,000
     8             (Base Project Allocation - $80,000)
     9             (Design and Contingencies - $35,000)
    10         (12)  SR 136, Intersection Improvement,
    11             Realignment of SR 136                         886,000
    12             (Base Project Allocation - $760,000)
    13             (Land Allocation - $44,000)
    14             (Design and Contingencies - $82,000)
    15         (13)  I-70, Interstate Restoration and
    16             Reconstruction                             40,000,000
    17             (Base Project Allocation - $40,000,000)
    18         (14)  I-79, Interstate Restoration and
    19             Reconstruction                             23,400,000
    20             (Base Project Allocation - $23,400,000)
    21         (15)  PA 136, Intersection Improvement          3,363,000
    22             (Base Project Allocation - $2,005,000)
    23             (Land Allocation - $689,000)
    24             (Design and Contingencies - $649,000)
    25         (16)  SR 1002, Intersection Improvement and
    26             Signalization                               1,581,000
    27             (Base Project Allocation - $1,515,000)
    28             (Design and Contingencies - $66,000)
    29         (17)  SR 19, Highway Restoration                1,120,000
    30             (Base Project Allocation - $1,120,000)
    20080S1504B2454                 - 121 -    

     1         (18)  SR 519, Intersection Improvement,
     2             Traffic Signal and Turning Lanes              258,000
     3             (Base Project Allocation - $169,000)
     4             (Land Allocation - $26,000)
     5             (Design and Contingencies - $63,000)
     6  Section 364.  Wayne County.
     7     Projects are as follows:
     8         (1)  SR 84, ITS Improvements and Purchases,
     9             I-84 Corridor and I-380 Corridor,
    10             Various Municipalities                        240,000
    11             (Base Project Allocation - $200,000)
    12             (Design and Contingencies - $40,000)
    13         (2)  I-84, Interstate Restoration and
    14             Reconstruction                              5,800,000
    15             (Base Project Allocation - $5,800,000)
    16         (3)  SR 590, Intersection Improvement           1,820,000
    17             (Base Project Allocation - $1,560,000)
    18             (Design and Contingencies - $260,000)
    19         (4)  SR 1023, Restoration, Roadway and
    20             Slope Repair                                  650,000
    21             (Base Project Allocation - $600,000)
    22             (Land Allocation - $50,000)
    23  Section 365.  Westmoreland County.
    24     Projects are as follows:
    25         (1)  SR 1045, Environmental Mitigation, SR
    26             1045, Stream Mitigation, Unity
    27             Township                                      300,000
    28             (Base Project Allocation - $300,000)
    29         (2)  SR 130, Intersection Improvement, SR
    30             130 and College Avenue, Hempfield
    20080S1504B2454                 - 122 -    

     1             Township and City of Jeannette                125,000
     2             (Base Project Allocation - $125,000)
     3         (3)  SR 30, Highway Restoration, SR 30 from
     4             Theater Street to PA 217, Derry and
     5             Unity Townships                             3,500,000
     6             (Base Project Allocation - $3,500,000)
     7         (4)  SR 30, Highway Restoration, US 30
     8             Betterment, Hempfield Township              6,200,000
     9             (Base Project Allocation - $6,200,000)
    10         (5)  SR 30, Widen to Provide Center and
    11             Left Turning Lane and Add Signals, SR
    12             30 Corridor from Irwin Bridge to Lower
    13             Circleville, Irwin Borough and North
    14             Huntingdon Township                           800,000
    15             (Base Project Allocation - $600,000)
    16             (Land Allocation - $120,000)
    17             (Design and Contingencies - $80,000)
    18         (6)  SR 30, Highway Restoration, SR 30 from
    19             Robbins Station Road to Central Avenue,
    20             Irwin Borough, North Huntingdon
    21             Township                                    2,800,000
    22             (Base Project Allocation - $2,800,000)
    23         (7)  SR 30, Widen, Add Lane, SR 30,
    24             Allegheny County Line to Leger Road, SR
    25             4019, North Huntingdon Township               920,000
    26             (Base Project Allocation - $700,000)
    27             (Land Allocation - $160,000)
    28             (Design and Contingencies - $60,000)
    29         (8)  SR 30, Widen to Provide Center and
    30             Left Turning Lane and Add Signals where
    20080S1504B2454                 - 123 -    

     1             Warranted, Add Lane, SR 30 from SR 4019
     2             to Malts Lane, North Huntingdon
     3             Township                                      300,000
     4             (Base Project Allocation - $100,000)
     5             (Land Allocation - $120,000)
     6             (Design and Contingencies - $80,000)
     7         (9)  SR 780, Intersection Improvement, New
     8             Traffic Signal, PA 780 and PA 380
     9             Intersection, Washington Township             315,000
    10             (Base Project Allocation - $240,000)
    11             (Design and Contingencies - $75,000)
    12         (10)  I-70, Interstate Restoration and
    13             Reconstruction                             16,600,000
    14             (Base Project Allocation - $16,600,000)
    15         (11)  PA 66, Intersection Improvement,
    16             Signal Improvements and Add Lane            2,463,000
    17             (Base Project Allocation - $1,839,000)
    18             (Land Allocation - $260,000)
    19             (Design and Contingencies - $364,000)
    20         (12)  SR 51, Intersection Improvement, Add
    21             Left Turning Lanes                          3,823,000
    22             (Base Project Allocation - $2,813,000)
    23             (Land Allocation - $306,000)
    24             (Design and Contingencies - $704,000)
    25  Section 366.  Wyoming County.
    26     Projects are as follows:
    27         (1)  US 6, ITS Improvements and Purchases,
    28             US 6 Corridor, Various Municipalities         120,000
    29             (Base Project Allocation - $100,000)
    30             (Design and Contingencies - $20,000)
    20080S1504B2454                 - 124 -    

     1         (2)  SR 4015, Highway Restoration, Slide
     2             Repair                                        117,000
     3             (Land Allocation - $117,000)
     4         (3)  SR 2007, Restoration, Roadway and
     5             Slope Repair                                  409,000
     6             (Base Project Allocation - $409,000)
     7         (4)  SR 4001, Restoration, Roadway and
     8             Slope Repair                                  288,000
     9             (Base Project Allocation - $288,000)
    10  Section 367.  York County.
    11     Projects are as follows:
    12         (1)  SR 30, Highway Restoration, Concrete
    13             Rehabilitation, US 30, Pavement
    14             Grinding from PA 74 to I-83, Manchester
    15             and West Manchester Townships and City
    16             of York                                     2,995,000
    17             (Base Project Allocation - $2,920,000)
    18             (Design and Contingencies - $75,000)
    19         (2)  SR 83, Interchange Improvement, I-83,
    20             Exit 19 and PA 462 Interchange,
    21             Springettsbury Township                       100,000
    22             (Design and Contingencies - $100,000)
    23         (3)  I-83, Interstate Restoration and
    24             Reconstruction                             39,000,000
    25             (Base Project Allocation - $39,000,000)
    26         (4)  PA 124, Safety Improvement, Widen          1,374,000
    27             (Base Project Allocation - $1,374,000)
    28         (5)  PA 124, Safety Improvement, Shoulder
    29             Improvement and Reduce S Curve                365,000
    30             (Base Project Allocation - $323,000)
    20080S1504B2454                 - 125 -    

     1             (Design and Contingencies - $42,000)
     2         (6)  PA 24, Safety Improvement, Widen and
     3             Add Lanes                                   5,805,000
     4             (Base Project Allocation - $969,000)
     5             (Land Allocation - $74,000)
     6             (Design and Contingencies - $4,762,000)
     7         (7)  SR 74, Corridor Safety Improvement,
     8             Widen and Overlay, Add Center Turn
     9             Lane                                           86,000
    10             (Base Project Allocation - $86,000)
    11         (8)  SR 83, Interchange Improvement,
    12             Lengthen Ramps                                200,000
    13             (Land Allocation - $200,000)
    14         (9)  SR 462, MARKET STREET, MILLING AND                    <--
    15             REPAVING, CITY OF YORK                      1,000,000
    16             (BASE PROJECT ALLOCATION - $1,000,000)
    17         (10)  SR 462, MARKET STREET, DUKE STREET TO
    18             HARRISON STREET, RECONSTRUCTION AND
    19             UPGRADING OF SIGNALIZATION, CITY OF
    20             YORK                                          750,000
    21             (BASE PROJECT ALLOCATION - $750,000)
    22  Section 368.  Statewide projects.
    23     Projects are as follows:
    24         (1)  Various Routes, Capitalization of
    25             Pennsylvania Infrastructure Bank,
    26             Various Projects, Statewide                90,000,000
    27             (Base Project Allocation - $90,000,000)
    28         (2)  Various Routes, Intersection of all
    29             State Routes with Other State Routes,
    30             Install or Replace Curb Cut Ramps as
    20080S1504B2454                 - 126 -    

     1             Required by The Americans with
     2             Disabilities Act, Various Projects,
     3             Statewide                                 400,000,000
     4             (Base Project Allocation -
     5             $400,000,000)
     6                             CHAPTER 5
     7                             (RESERVED)
     8                             CHAPTER 7
     9                      MISCELLANEOUS PROVISIONS
    10  Section 701.  Federal funds.                                      <--
    11     All moneys received from the Federal Government for the
    12  construction of the projects specifically itemized in this act
    13  are also hereby appropriated for those projects.
    14  Section 702.  Allocation of funds.
    15     Whenever as determined by the Department of Transportation
    16  that the full estimated financial costs of the projects itemized
    17  in this act are not necessary for the proper design, acquisition
    18  or construction of such projects, the excess funds no longer
    19  required may be allocated by the Department of Transportation to
    20  increase the estimated costs of any one or more of the projects
    21  specifically itemized in a capital budget.
    22  Section 703.  Estimated useful life.
    23     The General Assembly states that the estimated useful life of
    24  the highway capital projects itemized in this act is 30 years.
    25  SECTION 701.  DEBT AUTHORIZATION.                                 <--
    26     THE GOVERNOR, AUDITOR GENERAL AND STATE TREASURER ARE HEREBY
    27  AUTHORIZED AND DIRECTED TO BORROW FROM TIME TO TIME, IN ADDITION
    28  TO ANY AUTHORIZATION HERETOFORE OR HEREAFTER ENACTED, ON THE
    29  CREDIT OF THE COMMONWEALTH, SUBJECT TO THE LIMITATIONS PROVIDED
    30  IN THE CURRENT CAPITAL BUDGET, MONEY NOT EXCEEDING IN THE
    20080S1504B2454                 - 127 -    

     1  AGGREGATE THE SUM OF $4,716,904,000 AS MAY BE FOUND NECESSARY TO
     2  CARRY OUT THE ACQUISITION AND CONSTRUCTION OF THE STATE PROJECTS
     3  SPECIFICALLY ITEMIZED IN THIS ACT.
     4  SECTION 702.  ISSUE OF BONDS.
     5     THE INDEBTEDNESS AUTHORIZED IN THIS ACT SHALL BE INCURRED
     6  FROM TIME TO TIME AND SHALL BE EVIDENCED BY ONE OR MORE SERIES
     7  OF GENERAL OBLIGATION BONDS OF THE COMMONWEALTH IN SUCH
     8  AGGREGATE PRINCIPAL AMOUNT FOR EACH SERIES AS THE GOVERNOR,
     9  AUDITOR GENERAL AND STATE TREASURER SHALL DETERMINE, BUT THE
    10  LATEST STATED MATURITY DATE SHALL NOT EXCEED 30 YEARS FROM THE
    11  DATE OF THE BOND FIRST ISSUED FOR EACH SERIES.
    12  SECTION 703.  ESTIMATED USEFUL LIFE OF PROJECTS.
    13     THE GENERAL ASSEMBLY STATES THE ESTIMATED USEFUL LIFE OF THE
    14  PROJECTS ITEMIZED IN THIS ACT AS 30 YEARS.
    15  SECTION 704.  APPROPRIATION.
    16     THE NET PROCEEDS OF THE SALE OF THE OBLIGATIONS AUTHORIZED IN
    17  THIS ACT ARE HEREBY APPROPRIATED FROM THE CAPITAL FACILITIES
    18  FUND TO THE DEPARTMENT IN THE MAXIMUM AMOUNT OF $4,716,904,000
    19  TO BE USED BY IT EXCLUSIVELY TO DEFRAY THE FINANCIAL COSTS OF
    20  THE STATE PROJECTS SPECIFICALLY ITEMIZED IN THIS CAPITAL BUDGET.
    21  AFTER RESERVING OR PAYING THE EXPENSES OF THE SALE OF THE
    22  OBLIGATION, THE STATE TREASURER SHALL PAY OUT TO THE DEPARTMENT
    23  THE MONEYS AS REQUIRED AND CERTIFIED BY IT TO BE LEGALLY DUE AND
    24  PAYABLE.
    25  SECTION 705.  FEDERAL FUNDS.
    26     IN ADDITION TO THOSE FUNDS APPROPRIATED IN CHAPTER 3, ALL
    27  MONEYS RECEIVED FROM THE FEDERAL GOVERNMENT FOR THE PROJECTS
    28  SPECIFICALLY ITEMIZED IN THIS ACT ARE ALSO HEREBY APPROPRIATED
    29  FOR THOSE PROJECTS.
    30  SECTION 706.  ALLOCATION OF FUNDS.
    20080S1504B2454                 - 128 -    

     1     WHENEVER AS DETERMINED BY THE DEPARTMENT OF TRANSPORTATION
     2  THAT THE FULL ESTIMATED FINANCIAL COSTS OF THE PROJECTS ITEMIZED
     3  IN THIS ACT ARE NOT NECESSARY FOR THE PROPER DESIGN, ACQUISITION
     4  OR CONSTRUCTION OF SUCH PROJECTS, THE EXCESS FUNDS NO LONGER
     5  REQUIRED MAY BE ALLOCATED BY THE DEPARTMENT OF TRANSPORTATION TO
     6  INCREASE THE ESTIMATED COSTS OF ANY ONE OR MORE OF THE PROJECTS
     7  SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET.
     8  SECTION 704 707.  EFFECTIVE DATE.                                 <--
     9     THIS ACT SHALL TAKE EFFECT IMMEDIATELY.














    F17L86RLE/20080S1504B2454       - 129 -