        PRIOR PRINTER'S NO. 2219                      PRINTER'S NO. 2377

THE GENERAL ASSEMBLY OF PENNSYLVANIA


SENATE BILL

No. 1504 Session of 2008


        INTRODUCED BY STOUT AND MADIGAN, JUNE 19, 2008

        SENATOR ARMSTRONG, APPROPRIATIONS, RE-REPORTED AS AMENDED,
           SEPTEMBER 17, 2008

                                     AN ACT

     1  Providing for the highway capital budget project itemization for  <--
     2     the fiscal year 2008-2009.
     3  PROVIDING FOR THE HIGHWAY CAPITAL BUDGET PROJECT ITEMIZATION FOR  <--
     4     THE FISCAL YEAR 2008-2009.

     5     The General Assembly of the Commonwealth of Pennsylvania
     6  hereby enacts as follows:
     7                             CHAPTER 1                              <--
     8                         GENERAL PROVISIONS
     9  Section 101.  Short title.
    10     This act shall be known and may be cited as the Highway
    11  Capital Budget Project Itemization Act of 2008-2009.
    12  Section 102.  Total authorization.
    13     The total authorization for the capital projects itemized in
    14  Chapter 3 and to be constructed by the Department of
    15  Transportation, its successors or assigns and to be financed
    16  from current revenues of the Motor License Fund shall be
    17  $0,000,000,000.
    18  Section 103.  Itemization of public highway projects.

     1     Additional capital projects in the category of public highway
     2  projects to be constructed by the Department of Transportation,
     3  its successors or assigns and to be financed from current
     4  revenues of the Motor License Fund are itemized in Chapter 3,
     5  together with their respective estimated financial costs.
     6                             CHAPTER 3
     7                         ITEMIZED PROJECTS
     8                                                           Total
     9                                                          Project
    10             Project                                    Allocation
    11  Section 301.  Adams County (Reserved).
    12     Projects are as follows:
    13  Section 302.  Allegheny County.
    14     Projects are as follows:
    15         (1)  I-279, ITS Expansion, Corridor Safety
    16             Improvement, I-279 from Camp Home Road
    17             to I-79, Ross Township, Franklin Park
    18             Borough                                       763,000
    19             (Base Project Allocation - $763,000)
    20  Section 303.  Armstrong County (Reserved).
    21  Section 304.  Beaver County (Reserved).
    22  Section 305.  Bedford County (Reserved).
    23  Section 306.  Berks County (Reserved).
    24  Section 307.  Blair County (Reserved).
    25  Section 308.  Bradford County (Reserved).
    26  Section 309.  Bucks County (Reserved).
    27  Section 310.  Butler County (Reserved).
    28  Section 311.  Cambria County (Reserved).
    29  Section 312.  Cameron County (Reserved).
    30  Section 313.  Carbon County (Reserved).
    20080S1504B2377                  - 2 -     

     1  Section 314.  Centre County (Reserved).
     2  Section 315.  Chester County (Reserved).
     3  Section 316.  Clarion County (Reserved).
     4  Section 317.  Clearfield County (Reserved).
     5  Section 318.  Clinton County (Reserved).
     6  Section 319.  Columbia County (Reserved).
     7  Section 320.  Crawford County (Reserved).
     8  Section 321.  Cumberland County (Reserved).
     9  Section 322.  Dauphin County (Reserved).
    10  Section 323.  Delaware County (Reserved).
    11  Section 324.  Elk County (Reserved).
    12  Section 325.  Erie County (Reserved).
    13  Section 326.  Fayette County (Reserved).
    14  Section 327.  Forest County (Reserved).
    15  Section 328.  Franklin County (Reserved).
    16  Section 329.  Fulton County (Reserved).
    17  Section 330.  Greene County (Reserved).
    18  Section 331.  Huntingdon County (Reserved).
    19  Section 332.  Indiana County (Reserved).
    20  Section 333.  Jefferson County (Reserved).
    21  Section 334.  Juniata County (Reserved).
    22  Section 335.  Lackawanna County (Reserved).
    23  Section 336.  Lancaster County (Reserved).
    24  Section 337.  Lawrence County (Reserved).
    25  Section 338.  Lebanon County (Reserved).
    26  Section 339.  Lehigh County (Reserved).
    27  Section 340.  Luzerne County (Reserved).
    28  Section 341.  Lycoming County (Reserved).
    29  Section 342.  McKean County (Reserved).
    30  Section 343.  Mercer County (Reserved).
    20080S1504B2377                  - 3 -     

     1  Section 344.  Mifflin County (Reserved).
     2  Section 345.  Monroe County (Reserved).
     3  Section 346.  Montgomery County (Reserved).
     4  Section 347.  Montour County (Reserved).
     5  Section 348.  Northampton County (Reserved).
     6  Section 349.  Northumberland County (Reserved).
     7  Section 350.  Perry County (Reserved).
     8  Section 351.  Philadelphia County (Reserved).
     9  Section 352.  Pike County (Reserved).
    10  Section 353.  Potter County (Reserved).
    11  Section 354.  Schuylkill County (Reserved).
    12  Section 355.  Snyder County (Reserved).
    13  Section 356.  Somerset County (Reserved).
    14  Section 357.  Sullivan County (Reserved).
    15  Section 358.  Susquehanna County (Reserved).
    16  Section 359.  Tioga County (Reserved).
    17  Section 360.  Union County (Reserved).
    18  Section 361.  Venango County (Reserved).
    19  Section 362.  Warren County (Reserved).
    20  Section 363.  Washington County (Reserved).
    21  Section 364.  Wayne County (Reserved).
    22  Section 365.  Westmoreland County (Reserved).
    23  Section 366.  Wyoming County (Reserved).
    24  Section 367.  York County (Reserved).
    25  Section 368.  Statewide projects (Reserved).
    26                             CHAPTER 5
    27                             (RESERVED)
    28                             CHAPTER 7
    29                      MISCELLANEOUS PROVISIONS
    30  Section 701.  Federal funds.
    20080S1504B2377                  - 4 -     

     1     All moneys received from the Federal Government for the
     2  construction of the projects specifically itemized in this act
     3  are also hereby appropriated for those projects.
     4  Section 702.  Allocation of funds.
     5     Whenever as determined by the Department of Transportation
     6  that the full estimated financial costs of the projects itemized
     7  in this act are not necessary for the proper design, acquisition
     8  or construction of such projects, the excess funds no longer
     9  required may be allocated by the Department of Transportation to
    10  increase the estimated costs of any one or more of the projects
    11  specifically itemized in a capital budget.
    12  Section 703.  Estimated useful life.
    13     The General Assembly states that the estimated useful life of
    14  the highway capital projects itemized in this act is 30 years.
    15  Section 704.  Effective date.
    16     This act shall take effect immediately.
    17                             CHAPTER 1                              <--
    18                         GENERAL PROVISIONS
    19  SECTION 101.  SHORT TITLE.
    20     THIS ACT SHALL BE KNOWN AND MAY BE CITED AS THE HIGHWAY
    21  CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2008-2009.
    22  SECTION 102.  TOTAL AUTHORIZATION.
    23     THE TOTAL AUTHORIZATION FOR THE CAPITAL PROJECTS ITEMIZED IN
    24  CHAPTER 3 AND TO BE CONSTRUCTED BY THE DEPARTMENT OF
    25  TRANSPORTATION, ITS SUCCESSORS OR ASSIGNS AND TO BE FINANCED
    26  FROM CURRENT REVENUES OF THE MOTOR LICENSE FUND SHALL BE
    27  $3,361,513,000.
    28  SECTION 103.  ITEMIZATION OF PUBLIC HIGHWAY PROJECTS.
    29     ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC HIGHWAY
    30  PROJECTS TO BE CONSTRUCTED BY THE DEPARTMENT OF TRANSPORTATION,
    20080S1504B2377                  - 5 -     

     1  ITS SUCCESSORS OR ASSIGNS AND TO BE FINANCED FROM CURRENT
     2  REVENUES OF THE MOTOR LICENSE FUND ARE ITEMIZED IN CHAPTER 3,
     3  TOGETHER WITH THEIR RESPECTIVE ESTIMATED FINANCIAL COSTS.
     4                             CHAPTER 3
     5                         ITEMIZED PROJECTS
     6                                                           TOTAL
     7                                                          PROJECT
     8             PROJECT                                    ALLOCATION
     9  SECTION 301.  ADAMS COUNTY.
    10     PROJECTS ARE AS FOLLOWS:
    11         (1)  PA 94, RECONSTRUCT, ADD LANE, WIDEN        1,367,000
    12             (BASE PROJECT ALLOCATION - $,1,367,000)
    13  SECTION 302.  ALLEGHENY COUNTY.
    14     PROJECTS ARE AS FOLLOWS:
    15         (1)  I-279, ITS EXPANSION, CORRIDOR SAFETY
    16             IMPROVEMENT, I-279 FROM CAMP HORNE ROAD
    17             TO I-79, FRANKLIN PARK BOROUGH AND ROSS
    18             TOWNSHIP                                      763,000
    19             (BASE PROJECT ALLOCATION - $763,000)
    20         (2)  SR 1001, CONCRETE PAVEMENT
    21             RECONSTRUCTION, REHABILITATION, SR
    22             1001, FREEPORT ROAD NO.2 FROM ROSS
    23             STREET TO BURTNER ROAD, BRACKENRIDGE
    24             AND TARENTUM BOROUGHS AND HARRISON
    25             TOWNSHIP                                    4,778,000
    26             (BASE PROJECT ALLOCATION - $4,328,000)
    27             (DESIGN AND CONTINGENCIES - $450,000)
    28         (3)  SR 1001, CONCRETE PAVEMENT
    29             RECONSTRUCTION, REHABILITATION, SR
    30             1001, FREEPORT ROAD NO.3 FROM BURTNER
    20080S1504B2377                  - 6 -     

     1             ROAD TO BRACKENRIDGE BOROUGH LINE,
     2             BRACKENRIDGE BOROUGH AND HARRISON
     3             TOWNSHIP                                    3,875,000
     4             (BASE PROJECT ALLOCATION - $3,520,000)
     5             (DESIGN AND CONTINGENCIES - $355,000)
     6         (4)  SR 1001, CONCRETE PAVEMENT
     7             RECONSTRUCTION, REHABILITATION, SR
     8             1001, FREEPORT ROAD NO.1 FROM BAILEYS
     9             RUN TO NORTH OF LARUSSE BOULEVARD, EAST
    10             DEER AND TARENTUM TOWNSHIPS                 1,162,000
    11             (BASE PROJECT ALLOCATION - $1,056,000)
    12             (DESIGN AND CONTINGENCIES - $106,000)
    13         (5)  SR 1001, CONCRETE PAVEMENT
    14             RECONSTRUCTION, REHABILITATION, SR
    15             1001, ETNA BYPASS, ETNA BOROUGH               696,000
    16             (BASE PROJECT ALLOCATION - $632,000)
    17             (DESIGN AND CONTINGENCIES - $64,000)
    18         (6)  SR 1013, CONCRETE PAVEMENT
    19             RECONSTRUCTION, REHABILITATION, SR
    20             1013, SAXONBURG BOULEVARD, INDIANA AND
    21             WEST DEER TOWNSHIPS                         3,054,000
    22             (BASE PROJECT ALLOCATION - $2,774,000)
    23             (DESIGN AND CONTINGENCIES - $280,000)
    24         (7)  SR 130, SAFETY IMPROVEMENT, ALLEGHENY
    25             RIVER BOULEVARD FROM PENN HILLS TO
    26             VERONA, PENN HILLS TOWNSHIP AND CITY OF
    27             PITTSBURGH                                    588,000
    28             (BASE PROJECT ALLOCATION - $553,000)
    29             (DESIGN AND CONTINGENCIES - $35,000)
    30         (8)  SR 148, CONCRETE PAVEMENT
    20080S1504B2377                  - 7 -     

     1             RECONSTRUCTION, REHABILITATION, SR 148
     2             FROM EDEN PARK BOULEVARD TO LINCOLN
     3             HIGHWAY, CITY OF MCKEESPORT AND NORTH
     4             VERSAILLES TOWNSHIP                         3,080,000
     5             (BASE PROJECT ALLOCATION - $2,800,000)
     6             (DESIGN AND CONTINGENCIES - $280,000)
     7         (9)  SR 19, CONCRETE PAVEMENT
     8             RECONSTRUCTION, REHABILITATION, PERRY
     9             HIGHWAY, WESTBOUND FROM PINE CREEK ROAD
    10             TO SOUTH CHURCH ROAD, MCCANDLESS AND
    11             PINE TOWNSHIPS                              2,221,000
    12             (BASE PROJECT ALLOCATION - $2,016,000)
    13             (DESIGN AND CONTINGENCIES - $205,000)
    14         (10)  SR 19, CONCRETE PAVEMENT
    15             RECONSTRUCTION, REHABILITATION, PERRY
    16             HIGHWAY, EASTBOUND FROM PINE CREEK ROAD
    17             TO SOUTH CHURCH ROAD, MCCANDLESS AND
    18             PINE TOWNSHIPS                              2,221,000
    19             (BASE PROJECT ALLOCATION - $2,016,000)
    20             (DESIGN AND CONTINGENCIES - $205,000)
    21         (11)  SR 19, CONCRETE PAVEMENT
    22             RECONSTRUCTION, REHABILITATION,
    23             WASHINGTON ROAD, EASTBOUND FROM
    24             GILKESON ROAD TO COCHRAN ROAD, MT.
    25             LEBANON TOWNSHIP                            1,206,000
    26             (BASE PROJECT ALLOCATION - $1,096,000)
    27             (DESIGN AND CONTINGENCIES - $110,000)
    28         (12)  SR 19, CONCRETE PAVEMENT
    29             RECONSTRUCTION, REHABILITATION,
    30             WASHINGTON ROAD, WESTBOUND FROM
    20080S1504B2377                  - 8 -     

     1             GILKESON ROAD TO COCHRAN ROAD, MT.
     2             LEBANON TOWNSHIP                              898,000
     3             (BASE PROJECT ALLOCATION - $816,000)
     4             (DESIGN AND CONTINGENCIES - $82,000)
     5         (13)  SR 19, UPGRADE AND REBUILD TEN
     6             SIGNALS, SAFETY IMPROVEMENT, PERRY
     7             HIGHWAY FROM IVORY TO SEWICKLEY OAKMONT
     8             ROAD, WEST VIEW BOROUGH, PINE AND ROSS
     9             TOWNSHIPS AND CITY OF PITTSBURGH               50,000
    10             (DESIGN AND CONTINGENCIES - $50,000)
    11         (14)  SR 19, CONCRETE PAVEMENT
    12             RECONSTRUCTION, REHABILITATION, SR 19,
    13             BOYCE ROAD, UPPER ST. CLAIR TOWNSHIP        1,098,000
    14             (BASE PROJECT ALLOCATION - $998,000)
    15             (DESIGN AND CONTINGENCIES - $100,000)
    16         (15)  SR 19, CONCRETE PAVEMENT
    17             RECONSTRUCTION, REHABILITATION,
    18             PERRYSVILLE AVENUE FROM BELLEVUE ROAD
    19             TO HARDEN DRIVE, WEST VIEW BOROUGH          1,259,000
    20             (BASE PROJECT ALLOCATION - $1,144,000)
    21             (DESIGN AND CONTINGENCIES - $115,000)
    22         (16)  SR 2048, RESTORATION, REHABILITATION,
    23             SAFETY IMPROVEMENTS, BUSINESS ROUTE 22
    24             FROM RODI ROAD, SR 791 TO MOSSIDE
    25             BOULEVARD, SR 48, CHURCHILL AND
    26             MONROEVILLE BOROUGHS AND WILKINS
    27             TOWNSHIP                                    1,998,000
    28             (BASE PROJECT ALLOCATION - $1,974,000)
    29             (DESIGN AND CONTINGENCIES - $24,000)
    30         (17)  SR 2057, CONCRETE PAVEMENT
    20080S1504B2377                  - 9 -     

     1             RECONSTRUCTION, REHABILITATION, SR
     2             2057, HAYMAKER ROAD, MONROEVILLE
     3             BOROUGH                                       407,000
     4             (BASE PROJECT ALLOCATION - $370,000)
     5             (DESIGN AND CONTINGENCIES - $37,000)
     6         (18)  SR 2058, PAVEMENT RECONSTRUCTION,
     7             REHABILITATION, SR 2058, LEECHBURG
     8             ROAD, PENN HILLS TOWNSHIP                     966,000
     9             (BASE PROJECT ALLOCATION - $878,000)
    10             (DESIGN AND CONTINGENCIES - $88,000)
    11         (19)  SR 2073, CONCRETE PAVEMENT
    12             RECONSTRUCTION, REHABILITATION,
    13             ALLEGHENY RIVER BOULEVARD FROM SANDY
    14             CREEK TO COLLEGE, VERONA AND OAKMONT
    15             BOROUGHS AND PENN HILLS TOWNSHIP              805,000
    16             (BASE PROJECT ALLOCATION - $731,000)
    17             (DESIGN AND CONTINGENCIES - $74,000)
    18         (20)  SR 2073, CONCRETE PAVEMENT
    19             RECONSTRUCTION, REHABILITATION, SR 2073
    20             FROM SOUTH AVENUE TO PLUM STREET,
    21             VERONA BOROUGH                                330,000
    22             (BASE PROJECT ALLOCATION - $300,000)
    23             (DESIGN AND CONTINGENCIES - $30,000)
    24         (21)  SR 2104, CONCRETE PAVEMENT
    25             RECONSTRUCTION, REHABILITATION, SR
    26             2104, CHURCHILL ROAD, CHURCHILL
    27             BOROUGH                                       410,000
    28             (BASE PROJECT ALLOCATION - $372,000)
    29             (DESIGN AND CONTINGENCIES - $38,000)
    30         (22)  SR 2108, CONCRETE PAVEMENT
    20080S1504B2377                 - 10 -     

     1             RECONSTRUCTION, REHABILITATION, SR
     2             2108, WILKINS AVENUE, CITY OF
     3             PITTSBURGH                                    363,000
     4             (BASE PROJECT ALLOCATION - $330,000)
     5             (DESIGN AND CONTINGENCIES - $33,000)
     6         (23)  SR 2116, CONCRETE PAVEMENT
     7             RECONSTRUCTION, REHABILITATION, SR
     8             2116, BETTIS ROAD, DRAVOSBURG AND WEST
     9             MIFFLIN BOROUGHS                              429,000
    10             (BASE PROJECT ALLOCATION - $390,000)
    11             (DESIGN AND CONTINGENCIES - $39,000)
    12         (24)  SR 2128, CONCRETE PAVEMENT
    13             RECONSTRUCTION, REHABILITATION, TENTH
    14             STREET BYPASS PHASE II, SR 8041 TO FORT
    15             DUQUESNE BOULEVARD, CITY OF PITTSBURGH        616,000
    16             (BASE PROJECT ALLOCATION - $560,000)
    17             (DESIGN AND CONTINGENCIES - $56,000)
    18         (25)  SR 2128, CONCRETE PAVEMENT
    19             RECONSTRUCTION, REHABILITATION, SR
    20             3004, MCMURRAY ROAD, CITY OF
    21             PITTSBURGH                                    623,000
    22             (BASE PROJECT ALLOCATION - $566,000)
    23             (DESIGN AND CONTINGENCIES - $57,000)
    24         (26)  SR 2128, CONCRETE PAVEMENT
    25             RECONSTRUCTION, REHABILITATION, TENTH
    26             STREET BYPASS PHASE I, SR 8041 TO FORT
    27             DUQUESNE BOULEVARD, CITY OF PITTSBURGH        616,000
    28             (BASE PROJECT ALLOCATION - $560,000)
    29             (DESIGN AND CONTINGENCIES - $56,000)
    30         (27)  SR 279, CONCRETE PAVEMENT
    20080S1504B2377                 - 11 -     

     1             RECONSTRUCTION, REHABILITATION, SR 279,
     2             ROBINSON TOWNSHIP TO FORT PITT TUNNEL,
     3             CARNEGIE, GREEN TREE AND ROSSLYN FARMS
     4             BOROUGHS, COLLIER, SCOTT AND ROBINSON
     5             TOWNSHIPS AND CITY OF PITTSBURGH            2,860,000
     6             (BASE PROJECT ALLOCATION - $2,600,000)
     7             (DESIGN AND CONTINGENCIES - $260,000)
     8         (28)  SR 28, CONCRETE PAVEMENT
     9             RECONSTRUCTION, REHABILITATION, SR 28,
    10             NORTHBOUND FROM BAILY'S RUN TO COUNTY
    11             LINE, EAST DEER AND HARRISON TOWNSHIPS     13,750,000
    12             (BASE PROJECT ALLOCATION - $12,500,000)
    13             (DESIGN AND CONTINGENCIES - $1,250,000)
    14         (29)  SR 28, CONCRETE PAVEMENT
    15             RECONSTRUCTION, REHABILITATION, SR 28
    16             SOUTHBOUND FROM BAILY'S RUN TO COUNTY
    17             LINE, EAST DEER AND HARRISON TOWNSHIPS     13,750,000
    18             (BASE PROJECT ALLOCATION - $12,500,000)
    19             (DESIGN AND CONTINGENCIES - $1,250,000)
    20         (30)  SR 28, CONCRETE PAVEMENT
    21             RECONSTRUCTION, REHABILITATION, SR 28
    22             FROM MILVALE TO ETNA, ETNA BOROUGH AND
    23             SHALER TOWNSHIP                             3,850,000
    24             (BASE PROJECT ALLOCATION - $3,500,000)
    25             (DESIGN AND CONTINGENCIES - $350,000)
    26         (31)  SR 30, CONCRETE PAVEMENT
    27             RECONSTRUCTION, REHABILITATION, SR 30
    28             FROM COUNTY LINE TO CLINTON ROAD,
    29             FINDLAY TOWNSHIP                            1,650,000
    30             (BASE PROJECT ALLOCATION - $1,500,000)
    20080S1504B2377                 - 12 -     

     1             (DESIGN AND CONTINGENCIES - $150,000)
     2         (32)  SR 3005, CONCRETE PAVEMENT
     3             RECONSTRUCTION, REHABILITATION, SR
     4             3005, STATION STREET TO BANK STREET,
     5             BRIDGEVILLE BOROUGH                           421,000
     6             (BASE PROJECT ALLOCATION - $381,000)
     7             (DESIGN AND CONTINGENCIES - $40,000)
     8         (33)  SR 3009, CONCRETE PAVEMENT
     9             RECONSTRUCTION, REHABILITATION, SR
    10             3009, BAPTIST ROAD, BETHEL PARK AND
    11             WHITEHALL BOROUGHS                          1,130,000
    12             (BASE PROJECT ALLOCATION - $1,027,000)
    13             (DESIGN AND CONTINGENCIES - $103,000)
    14         (34)  SR 3009, CONCRETE PAVEMENT
    15             RECONSTRUCTION, REHABILITATION, SR
    16             3009, SOUTH PARK ROAD, BETHEL PARK
    17             BOROUGH                                       469,000
    18             (BASE PROJECT ALLOCATION - $426,000)
    19             (DESIGN AND CONTINGENCIES - $43,000)
    20         (35)  SR 3028, SLIDE CORRECTION, CONCRETE
    21             PAVEMENT RECONSTRUCTION,
    22             REHABILITATION, SR 3028, AT PRESTO AND
    23             SYGAN ROADS, SOUTH FAYETTE TOWNSHIP         1,100,000
    24             (BASE PROJECT ALLOCATION - $1,000,000)
    25             (DESIGN AND CONTINGENCIES - $100,000)
    26         (36)  SR 3038, SAFETY IMPROVEMENT, CONNER
    27             ROAD FROM WASHINGTON ROAD TO LIBRARY
    28             ROAD, BETHEL PARK BOROUGH AND MT.
    29             LEBANON TOWNSHIP                              354,000
    30             (BASE PROJECT ALLOCATION - $304,000)
    20080S1504B2377                 - 13 -     

     1             (DESIGN AND CONTINGENCIES - $50,000)
     2         (37)  SR 3044, CONCRETE PAVEMENT
     3             RECONSTRUCTION, REHABILITATION, CASTLE
     4             SHANNON BOULEVARD FROM WASHINGTON ROAD
     5             TO SCOTT ROAD, MT. LEBANON TOWNSHIP         1,100,000
     6             (BASE PROJECT ALLOCATION - $1,000,000)
     7             (DESIGN AND CONTINGENCIES - $100,000)
     8         (38)  SR 3054, SLIDE CORRECTION, CONCRETE
     9             PAVEMENT RECONSTRUCTION,
    10             REHABILITATION, SR 3054, SEGMENT 0020
    11             AND SEGMENT 0030, COLLIER TOWNSHIP          1,100,000
    12             (BASE PROJECT ALLOCATION - $1,000,000)
    13             (DESIGN AND CONTINGENCIES - $100,000)
    14         (39)  SR 3065, NEW TWO-LANE ROADWAY,
    15             BANKSVILLE CONNECTION TO WABASH TUNNEL
    16             TO BANKSVILLE ROAD IN CITY OF
    17             PITTSBURGH, GREEN TREE BOROUGH             14,620,000
    18             (BASE PROJECT ALLOCATION - $10,000,000)
    19             (LAND ALLOCATION - $2,000,000)
    20             (DESIGN AND CONTINGENCIES - $2,620,000)
    21         (40)  SR 3069, CONCRETE PAVEMENT
    22             RECONSTRUCTION, REHABILITATION, SR 3069
    23             FROM LIBERTY BRIDGE TO 6TH AVENUE, CITY
    24             OF PITTSBURGH                               1,650,000
    25             (BASE PROJECT ALLOCATION - $1,500,000)
    26             (DESIGN AND CONTINGENCIES - $150,000)
    27         (41)  SR 3069, CONCRETE PAVEMENT
    28             RECONSTRUCTION, REHABILITATION, WEST
    29             LIBERTY AVENUE FROM MCFARLAND TO SAW
    30             MILL RUN, DORMONT BOROUGH AND CITY OF
    20080S1504B2377                 - 14 -     

     1             PITTSBURGH                                  2,139,000
     2             (BASE PROJECT ALLOCATION - $1,944,000)
     3             (DESIGN AND CONTINGENCIES - $195,000)
     4         (42)  SR 3085, CONCRETE PAVEMENT
     5             RECONSTRUCTION, REHABILITATION, SR
     6             3085, FOREST GROVE ROAD, ROBINSON
     7             TOWNSHIP                                      590,000
     8             (BASE PROJECT ALLOCATION - $536,000)
     9             (DESIGN AND CONTINGENCIES - $54,000)
    10         (43)  SR 3087, CONCRETE PAVEMENT
    11             RECONSTRUCTION, REHABILITATION, SR
    12             3087, THORN RUN ROAD, MOON TOWNSHIP           752,000
    13             (BASE PROJECT ALLOCATION - $683,000)
    14             (DESIGN AND CONTINGENCIES - $69,000)
    15         (44)  SR 3092, CONCRETE PAVEMENT
    16             RECONSTRUCTION, REHABILITATION, SR
    17             3092, BROADWAY STREET, STOWE TOWNSHIP         398,000
    18             (BASE PROJECT ALLOCATION - $361,000)
    19             (DESIGN AND CONTINGENCIES - $37,000)
    20         (45)  SR 366, SIGNAL IMPROVEMENTS AT 4
    21             INTERSECTIONS, SR 8 AND SR 366, 2
    22             INTERSECTIONS EACH, TARENTUM BOROUGH
    23             AND SHALER TOWNSHIP                            50,000
    24             (BASE PROJECT ALLOCATION - $50,000)
    25         (46)  SR 376, INSTALLATION OF ITS EQUIPMENT
    26             TO INCLUDE VARIABLE TRAFFIC SYSTEM, I-
    27             376 FROM SOUTH BRADDOCK AVENUE TO SR
    28             2048, BUSINESS ROUTE 22, BRADDOCK
    29             HILLS, CHURCHILL, EDGEWOOD, WILKINSBURG
    30             BOROUGHS AND CITY OF PITTSBURGH                35,000
    20080S1504B2377                 - 15 -     

     1             (BASE PROJECT ALLOCATION - $35,000)
     2         (47)  SR 376, PAVEMENT RECONSTRUCTION,
     3             REHABILITATION, SQUIRREL HILL TUNNEL
     4             REHABILITATION NO.2, CITY OF
     5             PITTSBURGH                                  4,950,000
     6             (BASE PROJECT ALLOCATION - $4,500,000)
     7             (DESIGN AND CONTINGENCIES - $450,000)
     8         (48)  SR 400, CONCRETE PAVEMENT
     9             RECONSTRUCTION, REHABILITATION, BIGELOW
    10             BOULEVARD, NORTHBOUND CRAIG TO
    11             BLOOMFIELD BRIDGE, CITY OF PITTSBURGH         550,000
    12             (BASE PROJECT ALLOCATION - $500,000)
    13             (DESIGN AND CONTINGENCIES - $50,000)
    14         (49)  SR 400, CONCRETE PAVEMENT
    15             RECONSTRUCTION, REHABILITATION, BIGELOW
    16             BOULEVARD, SOUTHBOUND CRAIG TO
    17             BLOOMFIELD BRIDGE, CITY OF PITTSBURGH         550,000
    18             (BASE PROJECT ALLOCATION - $500,000)
    19             (DESIGN AND CONTINGENCIES - $50,000)
    20         (50)  SR 4003, CONCRETE PAVEMENT
    21             RECONSTRUCTION, REHABILITATION, SR
    22             4003, MCKNIGHT ROAD PHASE II, ROSS AND
    23             MCCANDLESS TOWNSHIPS                        6,592,000
    24             (BASE PROJECT ALLOCATION - $5,992,000)
    25             (DESIGN AND CONTINGENCIES - $600,000)
    26         (51)  SR 4003, CONCRETE PAVEMENT
    27             RECONSTRUCTION, REHABILITATION, SR
    28             4003, MCKNIGHT ROAD PHASE I, ROSS AND
    29             MCCANDLESS TOWNSHIPS                        6,458,000
    30             (BASE PROJECT ALLOCATION - $5,858,000)
    20080S1504B2377                 - 16 -     

     1             (DESIGN AND CONTINGENCIES - $600,000)
     2         (52)  SR 4024, CONCRETE PAVEMENT
     3             RECONSTRUCTION, REHABILITATION, SR
     4             4024, DUNCAN AVENUE, MCCANDLESS
     5             TOWNSHIP                                      836,000
     6             (BASE PROJECT ALLOCATION - $760,000)
     7             (DESIGN AND CONTINGENCIES - $76,000)
     8         (53)  SR 4036, CONCRETE PAVEMENT
     9             RECONSTRUCTION, REHABILITATION, BIG
    10             SEWICKLEY CREEK ROAD FROM SUNSET DRIVE
    11             TO HITZELL HILL ROAD, BELL ACRES AND
    12             ECONOMY BOROUGHS                            1,870,000
    13             (BASE PROJECT ALLOCATION - $1,700,000)
    14             (DESIGN AND CONTINGENCIES - $170,000)
    15         (54)  SR 4052, INTERSECTION IMPROVEMENT,
    16             WIDEN, WARRENDALE-BAYNE ROAD,
    17             IMPROVEMENTS, PHASE II, MARSHALL
    18             TOWNSHIP                                       99,000
    19             (BASE PROJECT ALLOCATION - $99,000)
    20         (55)  SR 4084, CONCRETE PAVEMENT
    21             RECONSTRUCTION, REHABILITATION, SR
    22             4084, WESTERN AVENUE AND RIDGE FROM
    23             CHATEAU STREET TO BRIGHTON ROAD, CITY
    24             OF PITTSBURGH                                 784,000
    25             (BASE PROJECT ALLOCATION - $712,000)
    26             (DESIGN AND CONTINGENCIES - $72,000)
    27         (56)  SR 48, CONCRETE PAVEMENT
    28             RECONSTRUCTION, REHABILITATION, SR 48,
    29             SCENERY DRIVE, FORWARD AND ELIZABETH
    30             TOWNSHIPS                                     715,000
    20080S1504B2377                 - 17 -     

     1             (BASE PROJECT ALLOCATION - $650,000)
     2             (DESIGN AND CONTINGENCIES - $65,000)
     3         (57)  SR 48, CONCRETE PAVEMENT
     4             RECONSTRUCTION, REHABILITATION, SR 48,
     5             T-130 TO MACBETH DRIVE, MONROEVILLE
     6             BOROUGH                                     2,120,000
     7             (BASE PROJECT ALLOCATION - $1,920,000)
     8             (DESIGN AND CONTINGENCIES - $200,000)
     9         (58)  SR 50, UPGRADE AND COORDINATE 8
    10             SIGNALS, SAFETY IMPROVEMENT, PA 50,
    11             COLLIER STREET TO NOBLESTOWN AND
    12             POPLAR, CARNEGIE, GREEN TREE AND
    13             HEIDELBERG BOROUGHS, SCOTT TOWNSHIP AND
    14             CITY OF PITTSBURGH                             18,000
    15             (DESIGN AND CONTINGENCIES - $18,000)
    16         (59)  SR 51, TRAFFIC SIGNAL UPGRADE, 9
    17             INTERSECTIONS, EXISTING SIGNAL
    18             IMPROVEMENT, SAW MILL RUN BOULEVARD
    19             FROM EDGEBROOKE AVENUE TO STEWART
    20             AVENUE, BRENTWOOD AND WHITEHALL
    21             BOROUGHS AND CITY OF PITTSBURGH               232,000
    22             (BASE PROJECT ALLOCATION - $232,000)
    23         (60)  SR 51, CONCRETE PAVEMENT
    24             RECONSTRUCTION, REHABILITATION,
    25             CLAIRTON BOULEVARD FROM LEWIS RUN TO
    26             CLOVERLEAF, PLEASANT HILLS BOROUGH          7,260,000
    27             (BASE PROJECT ALLOCATION - $6,600,000)
    28             (DESIGN AND CONTINGENCIES - $660,000)
    29         (61)  SR 60, CONCRETE PAVEMENT
    30             RECONSTRUCTION, REHABILITATION, SR 60
    20080S1504B2377                 - 18 -     

     1             FROM BUSINESS ROUTE 60 TO SOUTH
     2             EXPRESSWAY, FINDLAY AND MOON TOWNSHIPS     10,474,000
     3             (BASE PROJECT ALLOCATION - $9,522,000)
     4             (DESIGN AND CONTINGENCIES - $952,000)
     5         (62)  SR 60, NEW INTERCHANGE, DICK'S
     6             SPORTING GOODS HEADQUARTERS, BETWEEN SR
     7             60 AND BUSINESS ROUTE 60, CLINTON ROAD
     8             AND FLAUGHERTY RUN INTERCHANGE, FINDLAY
     9             TOWNSHIP                                    1,868,000
    10             (BASE PROJECT ALLOCATION - $1,868,000)
    11         (63)  SR 60, CONCRETE PAVEMENT
    12             RECONSTRUCTION, REHABILITATION, SR 60,
    13             SOUTH EXPRESSWAY NO.2, SEGMENT 0353 TO
    14             SEGMENT 0392 FROM AIRPORT TO FLAUGHERTY
    15             RUN, FINDLAY AND MOON TOWNSHIPS            18,500,000
    16             (BASE PROJECT ALLOCATION - $18,500,000)
    17         (64)  SR 60, CONCRETE PAVEMENT
    18             RECONSTRUCTION, REHABILITATION, SR 60,
    19             SOUTH EXPRESSWAY NO.1, SEGMENT 0352 TO
    20             SEGMENT 0392 FROM AIRPORT TO FLAUGHERTY
    21             RUN, FINDLAY AND MOON TOWNSHIPS            18,500,000
    22             (BASE PROJECT ALLOCATION - $18,500,000)
    23         (65)  SR 60, CONCRETE PAVEMENT
    24             RECONSTRUCTION, REHABILITATION, SR 60,
    25             SOUTH EXPRESSWAY NO.4, SEGMENT 0293 TO
    26             SEGMENT 0353 FROM BUSINESS ROUTE 60 TO
    27             AIRPORT, MOON TOWNSHIP                     20,000,000
    28             (BASE PROJECT ALLOCATION - $20,000,000)
    29         (66)  SR 60, CONCRETE PAVEMENT
    30             RECONSTRUCTION, REHABILITATION, SR 60,
    20080S1504B2377                 - 19 -     

     1             SOUTH EXPRESSWAY NO.3, SEGMENT 0292 TO
     2             SEGMENT 0352 FROM BUSINESS ROUTE 60 TO
     3             AIRPORT, MOON TOWNSHIP                     20,000,000
     4             (BASE PROJECT ALLOCATION - $20,000,000)
     5         (67)  SR 60, CONCRETE PAVEMENT
     6             RECONSTRUCTION, REHABILITATION,
     7             STEUBENVILLE PIKE FROM PARKWAY WEST TO
     8             I-79, ROBINSON TOWNSHIP                     2,750,000
     9             (BASE PROJECT ALLOCATION - $2,500,000)
    10             (DESIGN AND CONTINGENCIES - $250,000)
    11         (68)  SR 60, CONCRETE PAVEMENT
    12             RECONSTRUCTION, REHABILITATION, SR 60
    13             FROM SR 22 TO BUSINESS ROUTE 60, MOON,
    14             NORTH FAYETTE AND ROBINSON TOWNSHIPS        1,162,000
    15             (BASE PROJECT ALLOCATION - $1,056,000)
    16             (DESIGN AND CONTINGENCIES - $106,000)
    17         (69)  SR 65, UPGRADE AND COORDINATE 17
    18             SIGNALS, SAFETY IMPROVEMENT, SR 65 FROM
    19             WEST END BRIDGE TO CROSS STREET,
    20             VARIOUS MUNICIPALITIES                        200,000
    21             (BASE PROJECT ALLOCATION - $160,000)
    22             (DESIGN AND CONTINGENCIES - $40,000)
    23         (70)  SR 79, CONCRETE PATCHING RESTORATION,
    24             INTERSTATE MAINTENANCE, SR 79 FROM
    25             WASHINGTON COUNTY LINE TO BRIDGEVILLE,
    26             SEGMENT 496 TO SEGMENT 525, BRIDGEVILLE
    27             BOROUGH AND SOUTH FAYETTE TOWNSHIP          1,055,000
    28             (BASE PROJECT ALLOCATION - $927,000)
    29             (DESIGN AND CONTINGENCIES - $128,000)
    30         (71)  SR 79, CONCRETE PAVEMENT
    20080S1504B2377                 - 20 -     

     1             RECONSTRUCTION, REHABILITATION, SR 79
     2             FROM SR 279 TO SR 910, INCLUDING SR 910
     3             OVERHEAD DECK REPLACEMENT, FRANKLIN
     4             PARK BOROUGH AND MARSHALL TOWNSHIP          2,228,000
     5             (BASE PROJECT ALLOCATION - $2,025,000)
     6             (DESIGN AND CONTINGENCIES - $203,000)
     7         (72)  SR 79, CONCRETE PATCHING RESTORATION,
     8             INTERSTATE MAINTENANCE, SR 79 FROM
     9             CAMPBELLS RUN TO MOON RUN, SEGMENT 586
    10             TO SEGMENT 605, KENNEDY AND ROBINSON
    11             TOWNSHIPS                                     885,000
    12             (BASE PROJECT ALLOCATION - $800,000)
    13             (DESIGN AND CONTINGENCIES - $85,000)
    14         (73)  SR 79, CONCRETE PATCHING RESTORATION,
    15             INTERSTATE MAINTENANCE, SR 79 FROM
    16             CAMPBELLS RUN TO MOON RUN, VARIOUS
    17             MUNICIPALITIES                                 97,000
    18             (BASE PROJECT ALLOCATION - $97,000)
    19         (74)  SR 791, CONCRETE PAVEMENT
    20             RECONSTRUCTION, REHABILITATION, SR 791,
    21             RODI ROAD PHASE I, US 22 TO MAPLE LANE,
    22             CHURCHILL BOROUGH                             385,000
    23             (BASE PROJECT ALLOCATION - $350,000)
    24             (DESIGN AND CONTINGENCIES - $35,000)
    25         (75)  SR 791, CONCRETE PAVEMENT
    26             RECONSTRUCTION, REHABILITATION, SR 791,
    27             RODI ROAD PHASE II, SEGMENT 0021/0000
    28             TO SEGMENT 0021/1656, CHURCHILL
    29             BOROUGH                                       330,000
    30             (BASE PROJECT ALLOCATION - $300,000)
    20080S1504B2377                 - 21 -     

     1             (DESIGN AND CONTINGENCIES - $30,000)
     2         (76)  SR 8, CONCRETE PAVEMENT
     3             RECONSTRUCTION, REHABILITATION,
     4             ALLEGHENY RIVER BOULEVARD, SOUTHBOUND
     5             FROM WASHINGTON BOULEVARD TO HIGHLAND
     6             PARK BRIDGE, CITY OF PITTSBURGH               330,000
     7             (BASE PROJECT ALLOCATION - $300,000)
     8             (DESIGN AND CONTINGENCIES - $30,000)
     9         (77)  SR 8, CONCRETE PAVEMENT
    10             RECONSTRUCTION, REHABILITATION,
    11             ALLEGHENY RIVER BOULEVARD, NORTHBOUND
    12             FROM WASHINGTON BOULEVARD TO HIGHLAND
    13             PARK BRIDGE, CITY OF PITTSBURGH               330,000
    14             (BASE PROJECT ALLOCATION - $300,000)
    15             (DESIGN AND CONTINGENCIES - $30,000)
    16         (78)  SR 8, CORRIDOR SAFETY IMPROVEMENTS,
    17             CONGESTION REDUCTION, PENN AVENUE AND
    18             ARDMORE BOULEVARD FROM I-376 TO
    19             BRADDOCK AVENUE, HAMPTON, RICHLAND AND
    20             SHALER TOWNSHIPS                              175,000
    21             (BASE PROJECT ALLOCATION - $125,000)
    22             (DESIGN AND CONTINGENCIES - $50,000)
    23         (79)  SR 8, CONCRETE PAVEMENT
    24             RECONSTRUCTION, REHABILITATION, PENN
    25             AVENUE FROM SOUTH AVENUE TO BRADDOCK
    26             AVENUE, WILKINSBURG BOROUGH                   447,000
    27             (BASE PROJECT ALLOCATION - $406,000)
    28             (DESIGN AND CONTINGENCIES - $41,000)
    29         (80)  SR 837, SLIDE CORRECTION, CONCRETE
    30             REHABILITATION, SR 837, SEGMENT 190,
    20080S1504B2377                 - 22 -     

     1             DRAVOSBURG AND WEST MIFFLIN BOROUGHS        2,200,000
     2             (BASE PROJECT ALLOCATION - $2,000,000)
     3             (DESIGN AND CONTINGENCIES - $200,000)
     4         (81)  SR 88, CONCRETE PAVEMENT
     5             RECONSTRUCTION, REHABILITATION, LIBRARY
     6             ROAD FROM CASTLE SHANNON BOULEVARD TO
     7             SOUTH PARK ROAD, BETHEL PARK AND CASTLE
     8             SHANNON BOROUGHS                            2,500,000
     9             (BASE PROJECT ALLOCATION - $2,272,000)
    10             (DESIGN AND CONTINGENCIES - $228,000)
    11         (82)  SR 88, CONCRETE PAVEMENT
    12             RECONSTRUCTION, REHABILITATION, LIBRARY
    13             ROAD FROM BROWNSVILLE AND COUNTY LINE
    14             TO SOUTH PARK ROAD, BETHEL PARK BOROUGH
    15             AND SOUTH PARK TOWNSHIP                     3,215,000
    16             (BASE PROJECT ALLOCATION - $2,920,000)
    17             (DESIGN AND CONTINGENCIES - $295,000)
    18         (83)  SR 885, CONCRETE PAVEMENT
    19             RECONSTRUCTION, REHABILITATION, SR 885
    20             FROM STATE STREET TO BEECHWAY, CITY OF
    21             CLAIRTON                                      330,000
    22             (BASE PROJECT ALLOCATION - $300,000)
    23             (DESIGN AND CONTINGENCIES - $30,000)
    24         (84)  SR 885, CONCRETE PAVEMENT
    25             RECONSTRUCTION, REHABILITATION, SR 885
    26             FROM CLAIRTON ROAD TO PAYNE HILL ROAD,
    27             JEFFERSON HILLS BOROUGH                       517,000
    28             (BASE PROJECT ALLOCATION - $470,000)
    29             (DESIGN AND CONTINGENCIES - $47,000)
    30         (85)  SR 910, CONSTRUCT LEFT TURN LANES AND
    20080S1504B2377                 - 23 -     

     1             ADJUST TRAFFIC SIGNALS, INTERSECTION
     2             IMPROVEMENT, WEXFORD RUN ROAD, LEFT
     3             TURN, INTERSECTION OF SR 910 WEXFORD-
     4             BAYNE ROAD AND SR 4053 WEXFORD RUN
     5             ROAD, MARSHALL TOWNSHIP                        70,000
     6             (BASE PROJECT ALLOCATION - $64,000)
     7             (DESIGN AND CONTINGENCIES - $6,000)
     8         (86)  SR 910, CONCRETE PAVEMENT
     9             RECONSTRUCTION, REHABILITATION, SR 910,
    10             WEXFORD-BAYNE ROAD FROM SOUTH CHURCH
    11             ROAD TO BABCOCK BOULEVARD, PINE
    12             TOWNSHIP                                    2,669,000
    13             (BASE PROJECT ALLOCATION - $2,424,000)
    14             (DESIGN AND CONTINGENCIES - $245,000)
    15         (87)  SR 910, PAVEMENT RECONSTRUCTION,
    16             REHABILITATION, SR 910, WEXFORD-BAYNE
    17             ROAD FROM MINGO ROAD TO NORTH CHURCH
    18             ROAD, PINE TOWNSHIP                         1,736,000
    19             (BASE PROJECT ALLOCATION - $1,576,000)
    20             (DESIGN AND CONTINGENCIES - $160,000)
    21         (88)  SR 978, PAVEMENT RECONSTRUCTION,
    22             REHABILITATION, UNION AVENUE FROM
    23             BATTLE RIDGE ROAD TO NOBLESTOWN ROAD,
    24             OAKDALE BOROUGH AND SOUTH FAYETTE
    25             TOWNSHIP                                      339,000
    26             (BASE PROJECT ALLOCATION - $308,000)
    27             (DESIGN AND CONTINGENCIES - $31,000)
    28         (89)  VARIOUS ROUTES, INSTALLATION OF
    29             CENTER LINE RUMBLE STRIPS, RUMBLE
    30             STRIPS 2008, VARIOUS MUNICIPALITIES           200,000
    20080S1504B2377                 - 24 -     

     1             (BASE PROJECT ALLOCATION - $200,000)
     2         (90)  I-279, INTERSTATE RESTORATION AND
     3             RECONSTRUCTION                             19,000,000
     4             (BASE PROJECT ALLOCATION - $19,000,000)
     5         (91)  I-376, INTERSTATE RESTORATION AND
     6             RECONSTRUCTION                             14,000,000
     7             (BASE PROJECT ALLOCATION - $14,000,000)
     8         (92)  I-576, INTERSTATE RESTORATION AND
     9             RECONSTRUCTION                              1,200,000
    10             (BASE PROJECT ALLOCATION - $1,200,000)
    11         (93)  I-79, INTERSTATE RESTORATION AND
    12             RECONSTRUCTION                             27,000,000
    13             (BASE PROJECT ALLOCATION - $27,000,000)
    14         (94)  SR 3009, SAFETY AND INTERSECTION
    15             IMPROVEMENTS - SIGNALS UPDATES,
    16             WIDENING, TURNING LANES                       775,000
    17             (BASE PROJECT ALLOCATION - $775,000)
    18         (95)  SR 28, PREP WORK, SAFETY IMPROVEMENT,
    19             DIVIDED RELOCATION, MEDIAN BARRIER,
    20             PLANNING, WIDEN, ALTERNATIVE ROUTE
    21             IMPROVEMENTS AND ITS SYSTEMS                  832,000
    22             (BASE PROJECT ALLOCATION - $832,000)
    23         (96)  SR 4003, CORRIDOR SAFETY IMPROVEMENT
    24             UPGRADE AND COORDINATE TRAFFIC SIGNALS
    25             AT FOUR LOCATIONS                               3,000
    26             (DESIGN AND CONTINGENCIES - $3,000)
    27         (97)  SR 60, RECONSTRUCTION, REDESIGN
    28             INTERCHANGE REALIGNMENT, SAFETY
    29             IMPROVEMENT AND SIGNING                     2,000,000
    30             (BASE PROJECT ALLOCATION - $2,000,000)
    20080S1504B2377                 - 25 -     

     1         (98)  SR 8, WIDEN THE EXISTING PAVEMENT TO
     2             PROVIDE TURNING LANES                         156,000
     3             (BASE PROJECT ALLOCATION - $156,000)
     4         (99)  SR 48, EXTENSION OF MARSH DRIVE TO
     5             INTERSECT SR 48                               910,000
     6             (BASE PROJECT ALLOCATION - $800,000)
     7             (LAND ALLOCATION - $100,000)
     8             (DESIGN AND CONTINGENCIES - $10,000)
     9  SECTION 303.  ARMSTRONG COUNTY.
    10     PROJECTS ARE AS FOLLOWS:
    11         (1)  SR 28, NEW PARK AND RIDE LOT                 113,000
    12             (BASE PROJECT ALLOCATION - $102,000)
    13             (LAND ALLOCATION - $11,000)
    14         (2)  SR 28, PAVEMENT RECONSTRUCTION AND
    15             REHABILITATION                              1,380,000
    16             (BASE PROJECT ALLOCATION - $1,380,000)
    17         (3)  SR 422, PAVEMENT RECONSTRUCTION AND
    18             REHABILITATION                                520,000
    19             (BASE PROJECT ALLOCATION - $520,000)
    20         (4)  SR 422, PAVEMENT RECONSTRUCTION AND
    21             REHABILITATION                                140,000
    22             (BASE PROJECT ALLOCATION - $140,000)
    23         (5)  SR 422, RESTORATION AND SAFETY
    24             IMPROVEMENTS                               17,600,000
    25             (BASE PROJECT ALLOCATION - $14,400,000)
    26             (LAND ALLOCATION - $1,600,000)
    27             (DESIGN AND CONTINGENCIES - $1,600,000)
    28  SECTION 304.  BEAVER COUNTY.
    29     PROJECTS ARE AS FOLLOWS:
    30         (1)  SR 1003, CONCRETE PAVEMENT
    20080S1504B2377                 - 26 -     

     1             RECONSTRUCTION, REHABILITATION, SR
     2             1003, HILLSIDE AVENUE TO T-65, ELWOOD
     3             CITY BOROUGH                                  330,000
     4             (BASE PROJECT ALLOCATION - $300,000)
     5             (DESIGN AND CONTINGENCIES - $30,000)
     6         (2)  SR 1003, CONCRETE REHABILITATION,
     7             RECONSTRUCT AND BITUMINOUS OVERLAY,
     8             BRIGHTON ROAD FROM CHERRY HILL ROAD TO
     9             HILLSIDE AVENUE, ELWOOD CITY BOROUGH
    10             AND NORTH SEWICKLEY TOWNSHIP                  234,000
    11             (BASE PROJECT ALLOCATION - $234,000)
    12         (3)  SR 1003, CONCRETE PAVEMENT
    13             RECONSTRUCTION, REHABILITATION,
    14             BRIGHTON ROAD FROM ROUTE 65 TO SR 1002
    15             AND CHERRY HILL ROAD, NORTH SEWICKLEY
    16             TOWNSHIP                                      701,000
    17             (BASE PROJECT ALLOCATION - $637,000)
    18             (DESIGN AND CONTINGENCIES - $64,000)
    19         (4)  SR 1021, CONCRETE REHABILITATION,
    20             RECONSTRUCT, PINE RUN ROAD FROM SR 1015
    21             TO ROUTE 588, MARION TOWNSHIP                 560,000
    22             (BASE PROJECT ALLOCATION - $560,000)
    23         (5)  SR 1024, CONCRETE REHABILITATION,
    24             RECONSTRUCT AND BITUMINOUS OVERLAY,
    25             DEER LANE EXTENSION FROM VIRGINIA
    26             AVENUE TO BIG KNOB ROAD, NEW SEWICKLEY
    27             AND ROCHESTER TOWNSHIPS                       943,000
    28             (BASE PROJECT ALLOCATION - $943,000)
    29         (6)  SR 1039, CONCRETE REHABILITATION,
    30             RECONSTRUCT AND BITUMINOUS OVERLAY,
    20080S1504B2377                 - 27 -     

     1             VIRGINIA AVENUE AND ROCHESTER ROAD FROM
     2             SR 68 TO SUNFLOWER ROAD, PULASKI AND
     3             ROCHESTER TOWNSHIPS                           364,000
     4             (BASE PROJECT ALLOCATION - $364,000)
     5         (7)  SR 151, CONCRETE REHABILITATION,
     6             RECONSTRUCT AND BITUMINOUS OVERLAY,
     7             BOCKTOWN ROAD FROM ROUTE 30 TO THOMPSON
     8             HILL ROAD, GREENE, HANOVER,
     9             INDEPENDENCE AND RACCOON TOWNSHIPS          2,260,000
    10             (BASE PROJECT ALLOCATION - $2,210,000)
    11             (DESIGN AND CONTINGENCIES - $50,000)
    12         (8)  SR 151, CONCRETE REHABILITATION,
    13             RECONSTRUCT AND BITUMINOUS OVERLAY,
    14             BOCKTOWN ROAD FROM THOMPSON HILL ROAD
    15             TO ROUTE 60 INTERCHANGE, HOPEWELL AND
    16             INDEPENDENCE TOWNSHIPS                      1,089,000
    17             (BASE PROJECT ALLOCATION - $1,089,000)
    18         (9)  SR 168, CONCRETE PAVEMENT
    19             RECONSTRUCTION, REHABILITATION,
    20             HOOKSTOWN AND FRANKFURT ROAD FROM
    21             TEMPLE ROAD TO ROUTE 30, GREENE
    22             TOWNSHIP                                      571,000
    23             (BASE PROJECT ALLOCATION - $519,000)
    24             (DESIGN AND CONTINGENCIES - $52,000)
    25         (10)  SR 18, CONCRETE REHABILITATION,
    26             RECONSTRUCT AND BITUMINOUS OVERLAY,
    27             MAIN STREET FROM WASHINGTON COUNTY LINE
    28             TO TRAVERSE CREEK, FRANKFORT SPRINGS
    29             BOROUGH AND HANOVER TOWNSHIP                  699,000
    30             (BASE PROJECT ALLOCATION - $699,000)
    20080S1504B2377                 - 28 -     

     1         (11)  SR 18, CONCRETE REHABILITATION,
     2             RECONSTRUCT AND BITUMINOUS OVERLAY,
     3             FRANKFORT ROAD FROM CENTURY FARM ROAD
     4             TO HANOVER KENDALL ROAD, HANOVER
     5             TOWNSHIP                                      192,000
     6             (BASE PROJECT ALLOCATION - $192,000)
     7         (12)  SR 18, CONCRETE REHABILITATION,
     8             RECONSTRUCT AND BITUMINOUS OVERLAY,
     9             FRANKFORT ROAD FROM NEWER PAVEMENT TO
    10             SERVICE CREEK ROAD, HANOVER AND RACCOON
    11             TOWNSHIPS                                     628,000
    12             (BASE PROJECT ALLOCATION - $628,000)
    13         (13)  SR 2001, CONCRETE REHABILITATION,
    14             RECONSTRUCT, EASTBOUND DUSS AVENUE FROM
    15             TWENTY-FOURTH STREET TO LEGIONVILLE
    16             ROAD, HARMONY TOWNSHIP                        816,000
    17             (BASE PROJECT ALLOCATION - $816,000)
    18         (14)  SR 2001, CONCRETE REHABILITATION,
    19             RECONSTRUCT, WESTBOUND DUSS AVENUE FROM
    20             TWENTY-FOURTH STREET TO LEGIONVILLE
    21             ROAD, HARMONY TOWNSHIP                        816,000
    22             (BASE PROJECT ALLOCATION - $816,000)
    23         (15)  SR 2004, CONCRETE PAVEMENT
    24             RECONSTRUCTION, REHABILITATION, NINTH
    25             STREET FROM THIRD AVENUE TO FREEDOM-
    26             CRIDER ROAD, FREEDOM BOROUGH AND NORTH
    27             SEWICKLEY TOWNSHIP                            386,000
    28             (BASE PROJECT ALLOCATION - $351,000)
    29             (DESIGN AND CONTINGENCIES - $35,000)
    30         (16)  SR 2004, REALIGNMENT AND ROADWAY
    20080S1504B2377                 - 29 -     

     1             RECONSTRUCTION, SAFETY IMPROVEMENT,
     2             FREEDOM ROAD FROM SR 65 TO PARK QUARRY
     3             ROAD UPGRADE, PHASE A, NEW SEWICKLEY
     4             TOWNSHIP                                    4,400,000
     5             (BASE PROJECT ALLOCATION - $4,400,000)
     6         (17)  SR 2004, SLIDES CORRECTION CONCRETE
     7             REHABILITATION, RECONSTRUCTION, LOVI
     8             ROAD, SR 2004, SEGMENT 0040 TO SEGMENT
     9             0050, NEW SEWICKLEY TOWNSHIP                  930,000
    10             (BASE PROJECT ALLOCATION - $850,000)
    11             (LAND ALLOCATION - $30,000)
    12             (DESIGN AND CONTINGENCIES - $50,000)
    13         (18)  SR 2005, CONCRETE PAVEMENT
    14             RECONSTRUCTION, REHABILITATION, CONWAY
    15             WALLROSE ROAD FROM BIG SEWICKLEY CREEK
    16             ROAD TO PFAFF ROAD, ECONOMY BOROUGH         2,200,000
    17             (BASE PROJECT ALLOCATION - $2,000,000)
    18             (DESIGN AND CONTINGENCIES - $200,000)
    19         (19)  SR 2005, CONCRETE PAVEMENT
    20             RECONSTRUCTION, REHABILITATION, CONWAY
    21             WALLROSE ROAD FROM RIDGE ROAD EXTENSION
    22             TO PFAFF ROAD, ECONOMY BOROUGH                528,000
    23             (BASE PROJECT ALLOCATION - $480,000)
    24             (DESIGN AND CONTINGENCIES - $48,000)
    25         (20)  SR 2006, CONCRETE PAVEMENT
    26             RECONSTRUCTION, REHABILITATION, GOLDEN
    27             GROVE ROAD FROM SR 4052 TO LOCUST
    28             STREET, ECONOMY BOROUGH                       598,000
    29             (BASE PROJECT ALLOCATION - $543,000)
    30             (DESIGN AND CONTINGENCIES - $55,000)
    20080S1504B2377                 - 30 -     

     1         (21)  SR 30, CONCRETE PAVEMENT
     2             RECONSTRUCTION, REHABILITATION, LINCOLN
     3             HIGHWAY FROM WEST VIRGINIA LINE TO PAST
     4             RED DOG ROAD, GREENE TOWNSHIP                 330,000
     5             (BASE PROJECT ALLOCATION - $300,000)
     6             (DESIGN AND CONTINGENCIES - $30,000)
     7         (22)  SR 3005, CONCRETE REHABILITATION,
     8             RECONSTRUCT AND BITUMINOUS OVERLAY,
     9             CHAPEL ROAD FROM BRODHEAD ROAD TO
    10             FRANKFORT ROAD, CITY OF ALIQUIPPA AND
    11             CENTER AND HOPEWELL TOWNSHIPS               1,667,000
    12             (BASE PROJECT ALLOCATION - $1,667,000)
    13         (23)  SR 3012, CONCRETE REHABILITATION,
    14             RECONSTRUCT AND BITUMINOUS OVERLAY,
    15             CENTER GRANGE ROAD FROM BRODHEAD ROAD
    16             TO MONACA ROAD, CENTER TOWNSHIP               904,000
    17             (BASE PROJECT ALLOCATION - $904,000)
    18         (24)  SR 3014, CONCRETE REHABILITATION,
    19             RECONSTRUCT AND BITUMINOUS OVERLAY,
    20             GOLF COURSE ROAD FROM MILL STREET TO
    21             DEAD END, CITY OF ALIQUIPPA AND CENTER
    22             AND HOPEWELL TOWNSHIPS                        439,000
    23             (BASE PROJECT ALLOCATION - $439,000)
    24         (25)  SR 3016, CONCRETE REHABILITATION,
    25             RECONSTRUCT AND BITUMINOUS OVERLAY,
    26             GREEN GARDEN ROAD FROM FRANKFORT ROAD
    27             TO CLEARVIEW ROAD, RACCOON TOWNSHIP         1,030,000
    28             (BASE PROJECT ALLOCATION - $1,030,000)
    29         (26)  SR 3036, CONCRETE REHABILITATION,
    30             RECONSTRUCT AND BITUMINOUS OVERLAY,
    20080S1504B2377                 - 31 -     

     1             GRINGO AND INDEPENDENCE ROAD FROM
     2             BOCKTOWN ROAD TO INDEPENDENCE ROAD,
     3             HOPEWELL AND INDEPENDENCE TOWNSHIPS           605,000
     4             (BASE PROJECT ALLOCATION - $605,000)
     5         (27)  SR 351, CONCRETE REHABILITATION,
     6             RECONSTRUCT AND BITUMINOUS OVERLAY,
     7             FAIRLAND BOULEVARD FROM SR 18 TO SR
     8             168, BIG BEAVER, KOPPEL AND NEW GALILEE
     9             BOROUGHS                                    1,505,000
    10             (BASE PROJECT ALLOCATION - $1,417,000)
    11             (LAND ALLOCATION - $8,000)
    12             (DESIGN AND CONTINGENCIES - $80,000)
    13         (28)  SR 4002, CONCRETE REHABILITATION,
    14             RECONSTRUCT AND BITUMINOUS OVERLAY,
    15             LITTLE BOWER AND ANDER FROM ROUTE 51 TO
    16             LAWRENCE COUNTY LINE, DARLINGTON
    17             TOWNSHIP                                      923,000
    18             (BASE PROJECT ALLOCATION - $923,000)
    19         (29)  SR 4008, CONCRETE PAVEMENT
    20             RECONSTRUCTION, REHABILITATION, BRAUN
    21             ROAD FROM SHENANGO ROAD TO ROUTE 51,
    22             CHIPPEWA AND PATTERSON TOWNSHIPS              598,000
    23             (BASE PROJECT ALLOCATION - $543,000)
    24             (DESIGN AND CONTINGENCIES - $55,000)
    25         (30)  SR 4011, CONCRETE REHABILITATION,
    26             RECONSTRUCT AND BITUMINOUS OVERLAY,
    27             ELMBROOK ROAD FROM SR 251 TO MCCLAIN
    28             ROAD, SOUTH BEAVER TOWNSHIP                   468,000
    29             (BASE PROJECT ALLOCATION - $468,000)
    30         (31)  SR 4016, CONCRETE PAVEMENT
    20080S1504B2377                 - 32 -     

     1             RECONSTRUCTION, REHABILITATION, BEANER
     2             HOLLOW ROAD FROM DUTCH RIDGE ROAD TO
     3             RIVERSIDE DRIVE, BRIDGEWATER BOROUGH
     4             AND BRIGHTON TOWNSHIP                         501,000
     5             (BASE PROJECT ALLOCATION - $455,000)
     6             (DESIGN AND CONTINGENCIES - $46,000)
     7         (32)  SR 4019, CONCRETE REHABILITATION,
     8             RECONSTRUCT AND BITUMINOUS OVERLAY,
     9             PARK ROAD FROM BRADY'S RUN ROAD TO
    10             BLACKHAWK ROAD, BRIGHTON AND CHIPPEWA
    11             TOWNSHIPS                                   1,121,000
    12             (BASE PROJECT ALLOCATION - $1,121,000)
    13         (33)  SR 4020, CONCRETE REHABILITATION,
    14             RECONSTRUCT AND BITUMINOUS OVERLAY,
    15             DUTCH RIDGE ROAD FROM TUSCAWARAS ROAD
    16             TO PARK ROAD, BRIGHTON TOWNSHIP               910,000
    17             (BASE PROJECT ALLOCATION - $910,000)
    18         (34)  SR 4021, CONCRETE REHABILITATION,
    19             RECONSTRUCT AND BITUMINOUS OVERLAY,
    20             SHANANGO ROAD FROM BRAUN ROAD TO
    21             DARLINGTON ROAD, CHIPPEWA TOWNSHIP            455,000
    22             (BASE PROJECT ALLOCATION - $455,000)
    23         (35)  SR 4028, CONCRETE REHABILITATION,
    24             RECONSTRUCT AND BITUMINOUS OVERLAY,
    25             TUSCAWARAS ROAD FROM FAIRVIEW ROAD TO
    26             GEORGETOWN LANE, OHIOVILLE BOROUGH,
    27             BRIGHTON AND VANPORT TOWNSHIPS              3,250,000
    28             (BASE PROJECT ALLOCATION - $3,250,000)
    29         (36)  SR 4045, CONCRETE PAVEMENT
    30             RECONSTRUCTION, REHABILITATION, MURPHY
    20080S1504B2377                 - 33 -     

     1             HILL ROAD FROM MIDLAND AVENUE TO
     2             SUNRISE DRIVE, INDUSTRY AND MIDLAND
     3             BOROUGHS                                      330,000
     4             (BASE PROJECT ALLOCATION - $300,000)
     5             (DESIGN AND CONTINGENCIES - $30,000)
     6         (37)  SR 51, CONCRETE PAVEMENT
     7             RECONSTRUCTION, REHABILITATION, PENNA
     8             AVENUE EASTBOUND FROM SR 251 TO SR 168,
     9             CHIPPEWA AND SOUTH BEAVER TOWNSHIPS         3,300,000
    10             (BASE PROJECT ALLOCATION - $3,000,000)
    11             (DESIGN AND CONTINGENCIES - $300,000)
    12         (38)  SR 51, CONCRETE PAVEMENT
    13             RECONSTRUCTION, REHABILITATION, PENNA
    14             AVENUE WESTBOUND FROM SR 251 TO SR 168,
    15             CHIPPEWA AND SOUTH BEAVER TOWNSHIPS         3,300,000
    16             (BASE PROJECT ALLOCATION - $3,000,000)
    17             (DESIGN AND CONTINGENCIES - $300,000)
    18         (39)  SR 51, CONCRETE PAVEMENT
    19             RECONSTRUCTION, REHABILITATION, PENNA
    20             AVENUE FROM SR 168 TO TAGGERT ROAD,
    21             CHIPPEWA, DARLINGTON AND SOUTH BEAVER
    22             TOWNSHIPS                                   4,950,000
    23             (BASE PROJECT ALLOCATION - $4,500,000)
    24             (DESIGN AND CONTINGENCIES - $450,000)
    25         (40)  SR 51, CONCRETE PAVEMENT
    26             RECONSTRUCTION, REHABILITATION, PENNA
    27             AVENUE WESTBOUND FROM SR 168 TO TAGGERT
    28             ROAD, CHIPPEWA, DARLINGTON AND SOUTH
    29             BEAVER TOWNSHIPS                            4,950,000
    30             (BASE PROJECT ALLOCATION - $4,500,000)
    20080S1504B2377                 - 34 -     

     1             (DESIGN AND CONTINGENCIES - $450,000)
     2         (41)  SR 60, CONCRETE REHABILITATION,
     3             RECONSTRUCTION, SR 60 FROM CHIPPEWA TO
     4             VANPORT, BRIGHTON, CHIPPEWA AND VANPORT
     5             TOWNSHIPS                                   3,851,000
     6             (BASE PROJECT ALLOCATION - $3,426,000)
     7             (DESIGN AND CONTINGENCIES - $425,000
     8         (42)  SR 60, CONCRETE REHABILITATION,
     9             RECONSTRUCTION, SR 60 FROM VANPORT TO
    10             CENTER TOWNSHIP, CENTER, POTTER AND
    11             VANPORT TOWNSHIPS                           2,035,000
    12             (BASE PROJECT ALLOCATION - $1,850,000)
    13             (DESIGN AND CONTINGENCIES - $185,000)
    14         (43)  SR 60, CONCRETE REHABILITATION,
    15             RECONSTRUCTION, SR 60, I-376, PART 6,
    16             NORTHBOUND SEGMENT 0030 TO SEGMENT 0010
    17             AND SOUTHBOUND SEGMENT 0031 TO SEGMENT
    18             0011, HOPEWELL AND INDEPENDENCE
    19             TOWNSHIPS                                   1,353,000
    20             (BASE PROJECT ALLOCATION - $1,230,000)
    21             (DESIGN AND CONTINGENCIES - $123,000)
    22         (44)  SR 60, RECONSTRUCTION, INTERCHANGES,
    23             SAFETY FEATURES AND CROSSOVERS
    24             UPGRADES, SR 60, ALLEGHENY COUNTY LINE
    25             TO SR 60 TOLL ROAD, VARIOUS
    26             MUNICIPALITIES                             16,500,000
    27             (BASE PROJECT ALLOCATION - $15,000,000)
    28             (DESIGN AND CONTINGENCIES - $1,500,000)
    29         (45)  SR 65, SAFETY IMPROVEMENT, SR 65 FROM
    30             BADEN TO ROCHESTER, BADEN BOROUGH             193,000
    20080S1504B2377                 - 35 -     

     1             (BASE PROJECT ALLOCATION - $175,000)
     2             (DESIGN AND CONTINGENCIES - $18,000)
     3         (46)  SR 65, CONCRETE PAVEMENT
     4             RECONSTRUCTION, REHABILITATION, SR 65
     5             NORTHBOUND, FRENCH POINT BRIDGE TO
     6             TEVEBAUGH ROAD, BADEN AND ECONOMY
     7             BOROUGHS AND HARMONY TOWNSHIP               2,309,000
     8             (BASE PROJECT ALLOCATION - $2,280,000)
     9             (DESIGN AND CONTINGENCIES - $29,000)
    10         (47)  SR 65, CONCRETE PAVEMENT
    11             RECONSTRUCTION, REHABILITATION, SR 65
    12             SOUTHBOUND, FRENCH POINT BRIDGE TO
    13             TEVEBAUGH ROAD, BADEN AND ECONOMY
    14             BOROUGHS AND HARMONY TOWNSHIP               2,563,000
    15             (BASE PROJECT ALLOCATION - $2,328,000)
    16             (DESIGN AND CONTINGENCIES - $235,000)
    17         (48)  SR 65, CONCRETE PAVEMENT
    18             RECONSTRUCTION, REHABILITATION, MERCER
    19             ROAD FROM FIFTH AVENUE TO FOURTH
    20             STREET, NEW BRIGHTON BOROUGH                  330,000
    21             (BASE PROJECT ALLOCATION - $300,000)
    22             (DESIGN AND CONTINGENCIES - $30,000)
    23         (49)  SR 68, CONCRETE REHABILITATION,
    24             RECONSTRUCT AND BITUMINOUS OVERLAY, SR
    25             68 FROM SR 1039 TO NEW PAVEMENT,
    26             DAUGHERTY, NEW SEWICKLEY AND ROCHESTER
    27             TOWNSHIPS                                   1,261,000
    28             (BASE PROJECT ALLOCATION - $1,261,000)
    29         (50)  SR 68, CONCRETE REHABILITATION,
    30             RECONSTRUCT AND BITUMINOUS OVERLAY, SR
    20080S1504B2377                 - 36 -     

     1             68 FROM WOLFES RUN ROAD TO KINDER
     2             MORGAN TERMINALS, INDUSTRY BOROUGH            163,000
     3             (BASE PROJECT ALLOCATION - $163,000)
     4         (51)  SR 68, CONCRETE REHABILITATION,
     5             CONCRETE PAVEMENT RECONSTRUCTION,
     6             REHABILITATION, 68 MONTROSE DRIVE TO
     7             BUTLER COUNTY LINE, MARION AND NEW
     8             SEWICKLEY TOWNSHIPS                           580,000
     9             (BASE PROJECT ALLOCATION - $513,000)
    10             (LAND ALLOCATION - $3,000)
    11             (DESIGN AND CONTINGENCIES - $64,000)
    12         (52)  SR 68, CONCRETE PAVEMENT
    13             RECONSTRUCTION, REHABILITATION,
    14             VIRGINIA AVENUE FROM SR 1024 TO SR
    15             1039, ROCHESTER BOROUGH AND ROCHESTER
    16             TOWNSHIP                                      330,000
    17             (BASE PROJECT ALLOCATION - $300,000)
    18             (DESIGN AND CONTINGENCIES - $30,000)
    19         (53)  VARIOUS, RETAINING WALLS AND SLIDE
    20             CORRECTIONS                                    80,000
    21             (LAND ALLOCATION - $80,000)
    22  SECTION 305.  BEDFORD COUNTY.
    23     PROJECTS ARE AS FOLLOWS:
    24         (1)  SR 70, RESTORATION, REHABILITATION,
    25             SAFETY IMPROVEMENTS, I-70, BREEZEWOOD
    26             TO FULTON COUNTY LINE, EAST PROVIDENCE
    27             TOWNSHIP                                      850,000
    28             (BASE PROJECT ALLOCATION - $850,000)
    29         (2)  I-70, INTERSTATE RESTORATION AND
    30             RECONSTRUCTION                              3,500,000
    20080S1504B2377                 - 37 -     

     1             (BASE PROJECT ALLOCATION - $3,500,000)
     2         (3)  I-99, INTERSTATE RESTORATION AND
     3             RECONSTRUCTION                             14,000,000
     4             (BASE PROJECT ALLOCATION - $14,000,000)
     5         (4)  SR 26, INTERSECTION IMPROVEMENT,
     6             SAFETY IMPROVEMENT                            845,000
     7             (BASE PROJECT ALLOCATION - $700,000)
     8             (LAND ALLOCATION - $100,000)
     9             (DESIGN AND CONTINGENCIES - $45,000)
    10         (5)  SR 4009, WIDEN, RESURFACE AND
    11             INTERSECTION IMPROVEMENTS,
    12             SIGNALIZATION                                 465,000
    13             (BASE PROJECT ALLOCATION - $465,000)
    14         (6)  SR 1007, CONCRETE PAVEMENT RESTORATION
    15             AND OVERLAY                                 6,600,000
    16             (BASE PROJECT ALLOCATION - $6,600,000)
    17         (7)  SR 220, OVERLAY AND SHOULDER UPGRADE       1,526,000
    18             (BASE PROJECT ALLOCATION - $1,526,000)
    19         (8)  SR 30, CONCRETE PAVEMENT RESTORATION
    20             AND OVERLAY                                   769,000
    21             (BASE PROJECT ALLOCATION - $769,000)
    22         (9)  SR 30, CONCRETE PAVEMENT RESTORATION
    23             AND OVERLAY AND UPGRADE DRAINAGE            4,900,000
    24             (DESIGN AND CONTINGENCIES - $4,900,000
    25         (10)  SR 56, CONCRETE PAVEMENT RESTORATION
    26             AND OVERLAY                                 2,250,000
    27             (BASE PROJECT ALLOCATION - $2,250,000)
    28  SECTION 306.  BERKS COUNTY.
    29     PROJECTS ARE AS FOLLOWS:
    30         (1)  SR 1010, INTERSECTION SIGNALIZATION,
    20080S1504B2377                 - 38 -     

     1             SR 1010 AND DRIES ROAD INTERSECTION,
     2             ONTELAUNEE TOWNSHIP                           200,000
     3             (BASE PROJECT ALLOCATION - $50,000)
     4             (DESIGN AND CONTINGENCIES - $150,000)
     5         (2)  SR 1021, SAFETY IMPROVEMENT, TREE
     6             CUTTING, EXCAVATING AND SHOULDER WORK,
     7             SR 1021 AND SR 1024, LONG LANE
     8             INTERSECTION, MAXATAWNY TOWNSHIP              325,000
     9             (BASE PROJECT ALLOCATION - $75,000)
    10             (DESIGN AND CONTINGENCIES - $250,000)
    11         (3)  SR 12, EXCAVATING, EMBANKMENT,
    12             SHOULDERS, GUIDE RAIL AND UTILITY
    13             POLES, SR 12, SAFETY IMPROVEMENTS,
    14             ALSACE TOWNSHIP                               600,000
    15             (BASE PROJECT ALLOCATION - $100,000)
    16             (DESIGN AND CONTINGENCIES - $500,000)
    17         (4)  SR 222, HIGHWAY RECONSTRUCTION, SR
    18             222, NORTH CORRIDOR PHASE I,
    19             MAIDENCREEK, ONTELAUNEE AND RICHMOND
    20             TOWNSHIPS                                  36,600,000
    21             (BASE PROJECT ALLOCATION - $30,600,000)
    22             (LAND ALLOCATION - $2,800,000)
    23             (DESIGN AND CONTINGENCIES - $3,200,000)
    24         (5)  SR 222, INSTALL CLOSED CIRCUIT
    25             TELEVISION CAMERAS, ROUTE 222, NONURBAN
    26             AREA, VARIOUS MUNICIPALITIES                1,124,000
    27             (BASE PROJECT ALLOCATION - $254,000)
    28             (LAND ALLOCATION - $20,000)
    29             (DESIGN AND CONTINGENCIES - $850,000)
    30         (6)  SR 222 AND SR 422, INSTALLATION OF
    20080S1504B2377                 - 39 -     

     1             DYNAMIC MESSAGE SIGNS, SR 222 AND SR
     2             422, NONURBAN AREA, VARIOUS
     3             MUNICIPALITIES                                410,000
     4             (BASE PROJECT ALLOCATION - $250,000)
     5             (LAND ALLOCATION - $15,000)
     6             (DESIGN AND CONTINGENCIES - $145,000)
     7         (7)  SR 222 AND SR 422, INSTALLATION OF
     8             VARIABLE MESSAGE SIGNS AND CLOSED
     9             CIRCUIT TELEVISION CAMERAS, SR 222 AND
    10             SR 422 URBAN AREA, VARIOUS
    11             MUNICIPALITIES                                390,000
    12             (BASE PROJECT ALLOCATION - $225,000)
    13             (LAND ALLOCATION - $15,000)
    14             (DESIGN AND CONTINGENCIES - $150,000)
    15         (8)  SR 3008, INTERSECTION IMPROVEMENT AND
    16             CURVE SAFETY IMPROVEMENTS, SR 3008,
    17             SEGMENT 50 TO SEGMENT 60, LOWER
    18             HEIDELBERG AND NORTH HEIDELBERG
    19             TOWNSHIPS                                     300,000
    20             (BASE PROJECT ALLOCATION - $75,000)
    21             (DESIGN AND CONTINGENCIES - $225,000)
    22         (9)  SR 3023, CURVE SAFETY IMPROVEMENTS, SR
    23             3023, VICINITY OF EVANS HILL ROAD AND
    24             SWEITZER ROAD, LOWER HEIDELBERG
    25             TOWNSHIP                                      300,000
    26             (BASE PROJECT ALLOCATION - $75,000)
    27             (DESIGN AND CONTINGENCIES - $225,000)
    28         (10)  SR 422, CONGESTION REDUCTION, SAFETY
    29             IMPROVEMENTS, PENN AVENUE, SR 422
    30             CORRIDOR, ROBESONIA, SINKING SPRING AND
    20080S1504B2377                 - 40 -     

     1             WERNERSVILLE BOROUGHS, HEIDELBERG,
     2             LOWER HEIDELBERG AND SOUTH HEIDELBERG
     3             TOWNSHIPS                                     360,000
     4             (BASE PROJECT ALLOCATION - $285,000)
     5             (LAND ALLOCATION - $15,000)
     6             (DESIGN AND CONTINGENCIES - $60,000)
     7         (11)  SR 562, INTERSECTION IMPROVEMENT,
     8             CONGESTION MITIGATION, SR 562,
     9             INTERSECTION OF SHELBOURNE ROAD,
    10             BOYERTOWN PIKE AND OLEY TURNPIKE ROAD,
    11             EXETER AND OLEY TOWNSHIPS                     400,000
    12             (BASE PROJECT ALLOCATION - $100,000)
    13             (LAND ALLOCATION - $40,000)
    14             (DESIGN AND CONTINGENCIES - $260,000)
    15         (12)  SR 78, REPLACEMENT OF PRECAST
    16             PARAPETS, RATS PRECAST PARAPETS,
    17             GREENWICH TOWNSHIP                            475,000
    18             (BASE PROJECT ALLOCATION - $20,000)
    19             (DESIGN AND CONTINGENCIES - $455,000)
    20         (13)  SR 78, SAFETY GATES, SR 78 CORRIDOR,
    21             VARIOUS MUNICIPALITIES                        525,000
    22             (BASE PROJECT ALLOCATION - $525,000)
    23         (14)  SR 78, INSTALLATION OF CLOSED CIRCUIT
    24             TELEVISION CAMERAS, HIGHWAY ADVISORY
    25             RADIO, CHANGEABLE MESSAGE SIGNS, I-78
    26             CORRIDOR AND SR 61 INTO I-78
    27             INTERSECTION, VARIOUS MUNICIPALITIES          490,000
    28             (BASE PROJECT ALLOCATION - $360,000)
    29             (LAND ALLOCATION - $15,000)
    30             (DESIGN AND CONTINGENCIES - $115,000)
    20080S1504B2377                 - 41 -     

     1         (15)  SR 78, INSTALL TENTH MILE LOCATION
     2             MARKERS, SAFETY IMPROVEMENT, I-78
     3             CORRIDOR, VARIOUS MUNICIPALITIES              102,000
     4             (BASE PROJECT ALLOCATION - $7,000)
     5             (DESIGN AND CONTINGENCIES - $95,000)
     6         (16)  I-176, INTERSTATE RESTORATION AND
     7             RECONSTRUCTION                             11,100,000
     8             (BASE PROJECT ALLOCATION - $11,100,000)
     9         (17)  I-78, INTERSTATE RESTORATION AND
    10             RECONSTRUCTION                             38,500,000
    11             (BASE PROJECT ALLOCATION - $38,500,000)
    12         (18)  SR 183, INTERSECTION IMPROVEMENT            268,000
    13             (BASE PROJECT ALLOCATION - $111,000)
    14             (LAND ALLOCATION - $52,000)
    15             (DESIGN AND CONTINGENCIES - $105,000)
    16         (19)  SR 82, HIGHWAY RESTORATION                1,500,000
    17             (BASE PROJECT ALLOCATION - $1,500,000)
    18  SECTION 307.  BLAIR COUNTY.
    19     PROJECTS ARE AS FOLLOWS:
    20         (1)  SR 1001, WIDEN, ADD LANE, PLEASANT
    21             VALLEY BOULEVARD, CITY OF ALTOONA             264,000
    22             (BASE PROJECT ALLOCATION - $192,500)
    23             (LAND ALLOCATION - $11,500)
    24             (DESIGN AND CONTINGENCIES - $60,000)
    25         (2)  SR 1008, PARK AND RIDE LOT, ANTIS
    26             TOWNSHIP PARK AND RIDE, ADJACENT TO
    27             PENNDOT STOCKPILE, ANTIS TOWNSHIP             118,000
    28             (BASE PROJECT ALLOCATION - $93,000)
    29             (DESIGN AND CONTINGENCIES - $25,000)
    30         (3)  SR 1012, PARK AND RIDE LOT, TENTH
    20080S1504B2377                 - 42 -     

     1             STREET PARK AND RIDE, UNDER BRIDGE AT
     2             SR 99, TYRONE BOROUGH, SNYDER TOWNSHIP        478,000
     3             (BASE PROJECT ALLOCATION - $253,000)
     4             (LAND ALLOCATION - $25,000)
     5             (DESIGN AND CONTINGENCIES - $200,000)
     6         (4)  SR 3013, CONSTRUCT CENTER TURN LANE,
     7             DUNNINGS HIGHWAY CORRIDOR, PINE RUN TO
     8             SOUTH OF WALNUT STREET INTERSECTION,
     9             GREENFIELD TOWNSHIP                           489,000
    10             (BASE PROJECT ALLOCATION - $400,000)
    11             (LAND ALLOCATION - $11,000)
    12             (DESIGN AND CONTINGENCIES - $78,000)
    13         (5)  SR 36, INCREASE CLEARANCE BENEATH I-
    14             99, PA 36 UNDER I-99, LOGAN TOWNSHIP
    15             AND CITY OF ALTOONA                           300,000
    16             (BASE PROJECT ALLOCATION - $300,000)
    17         (6)  SR 4019, SAFETY IMPROVEMENT
    18             RELOCATION, REALIGNMENT, PINECROFT
    19             CURVES, ANTIS TOWNSHIP                      1,740,000
    20             (BASE PROJECT ALLOCATION - $1,620,000)
    21             (DESIGN AND CONTINGENCIES - $120,000)
    22         (7)  SR 8004, RAMPS, RESTORATION,
    23             REHABILITATION, SAFETY IMPROVEMENTS, I-
    24             99, US 22 AND PA 764 INTERCHANGES,
    25             ALLEGHENY TOWNSHIP                            400,000
    26             (BASE PROJECT ALLOCATION - $400,000)
    27         (8)  SR 8023, PAVEMENT RESTORATION, SAFETY
    28             IMPROVEMENTS, I-99, BLAIR COUNTY RAMPS,
    29             ALLEGHENY, ANTIS, FREEDOM, GREENFIELD,
    30             LOGAN AND SNYDER TOWNSHIPS                    500,000
    20080S1504B2377                 - 43 -     

     1             (BASE PROJECT ALLOCATION - $500,000)
     2         (9)  SR 99, RESTORATION, REHABILITATION,
     3             SAFETY IMPROVEMENTS, I-99, PLANK ROAD
     4             TO FRANKSTOWN ROAD, LOGAN TOWNSHIP AND
     5             CITY OF ALTOONA                               480,000
     6             (BASE PROJECT ALLOCATION - $480,000)
     7         (10)  SR 99, PAVEMENT RESTORATION AND
     8             REHABILITATION, I-99, SPROUL-NEWRY
     9             PULL-OFF, MILEPOST 17 TO EAST FREEDOM
    10             INTERCHANGE, FREEDOM AND GREENFIELD
    11             TOWNSHIPS                                   1,750,000
    12             (BASE PROJECT ALLOCATION - $1,750,000)
    13         (11)  I-99, INTERSTATE RESTORATION AND
    14             RECONSTRUCTION                             37,110,000
    15             (BASE PROJECT ALLOCATION - $37,110,000)
    16         (12)  SR 1021, NEW ROADWAY, INTERCHANGE
    17             IMPROVEMENT                                   745,000
    18             (LAND ALLOCATION - $20,000)
    19             (DESIGN AND CONTINGENCIES - $725,000)
    20         (13)  SR 22, CONCRETE REHABILITATION,
    21             GUIDERAIL AND DRAINAGE IMPROVEMENTS         2,133,000
    22             (BASE PROJECT ALLOCATION - $2,133,000)
    23         (14)  SR 22, ADD LANE                             100,000
    24             (LAND ALLOCATION - $100,000)
    25         (15)  SR 866, HIGHWAY REHABILITATION,
    26             RESURFACING, SHOULDER IMPROVEMENT             400,000
    27             (BASE PROJECT ALLOCATION - $400,000)
    28         (16)  SR 350, CONCRETE PAVEMENT RESTORATION
    29             AND OVERLAY                                 2,500,000
    30             (BASE PROJECT ALLOCATION - $2,500,000)
    20080S1504B2377                 - 44 -     

     1         (17)  SR 36, CONCRETE PAVEMENT RESTORATION
     2             AND OVERLAY                                 2,825,000
     3             (BASE PROJECT ALLOCATION - $2,825,000)
     4         (18)  SR 36, REPLACE EXISTING METAL ARCH
     5             PIPE WITH A BOX CULVERT                       950,000
     6             (BASE PROJECT ALLOCATION - $950,000)
     7         (19)  SR 4013, PHASE I, INTERSECTION
     8             IMPROVEMENT AND WIDENING                    1,500,000
     9             (DESIGN AND CONTINGENCIES - $1,500,000)
    10         (20)  SR 4017, CONCRETE PAVEMENT
    11             RESTORATION AND OVERLAY                     2,165,000
    12             (BASE PROJECT ALLOCATION - $2,165,000)
    13         (21)  SR 453, CONCRETE PAVEMENT RESTORATION
    14             AND OVERLAY                                 1,350,000
    15             (BASE PROJECT ALLOCATION - $1,350,000)
    16         (22)  SR 764, CONCRETE PAVEMENT RESTORATION
    17             AND OVERLAY                                 1,900,000
    18             (BASE PROJECT ALLOCATION - $1,900,000)
    19  SECTION 308.  BRADFORD COUNTY.
    20     PROJECTS ARE AS FOLLOWS:
    21         (1)  SR 1043, SLIDE REPAIRS, SHESHEQUIN
    22             SLIDES, SR 1043, SEGMENT 0220 TO
    23             SEGMENT 0230, ATHENS AND SHESHEQUIN
    24             TOWNSHIPS                                   2,040,000
    25             (BASE PROJECT ALLOCATION - $1,780,000)
    26             (LAND ALLOCATION - $40,000)
    27             (DESIGN AND CONTINGENCIES - $220,000)
    28         (2)  SR 220, SAFETY IMPROVEMENT, TRACY ROAD
    29             TO T-624, ALBANY TOWNSHIP                     113,000
    30             (BASE PROJECT ALLOCATION - $80,000)
    20080S1504B2377                 - 45 -     

     1             (LAND ALLOCATION - $6,000)
     2             (DESIGN AND CONTINGENCIES - $27,000)
     3         (3)  SR 467, SLIDE REPAIRS, SR 467, SEGMENT
     4             20 AND SEGMENT 180, PIKE AND ROME
     5             TOWNSHIPS                                     980,000
     6             (BASE PROJECT ALLOCATION - $840,000)
     7             (LAND ALLOCATION - $20,000)
     8             (DESIGN AND CONTINGENCIES - $120,000)
     9         (4)  SR 6, SAFETY IMPROVEMENT AND
    10             RESURFACE, TRACY ROAD TO T-624,
    11             STANDING STONE TOWNSHIP                       440,000
    12             (BASE PROJECT ALLOCATION - $400,000)
    13             (DESIGN AND CONTINGENCIES - $40,000)
    14         (5)  SR 6, INTERSECTION IMPROVEMENT, SR 6
    15             AND SR 2010 INTERSECTION, WYALUSING
    16             TOWNSHIP                                      975,000
    17             (BASE PROJECT ALLOCATION - $975,000)
    18         (6)  SR 220, RESURFACING, RESTORATION           2,890,000
    19             (BASE PROJECT ALLOCATION - $2,850,000)
    20             (LAND ALLOCATION - $40,000)
    21         (7)  SR 220, RESURFACING, RESTORATION             630,000
    22             (BASE PROJECT ALLOCATION - $600,000)
    23             (LAND ALLOCATION - $30,000)
    24         (8)  SR 220, HIGHWAY RESTORATION                4,570,000
    25             (BASE PROJECT ALLOCATION - $4,500,000)
    26             (LAND ALLOCATION - $40,000)
    27             (DESIGN AND CONTINGENCIES - $30,000)
    28         (9)  SR 3016, RESURFACING, RESTORATION            509,000
    29             (BASE PROJECT ALLOCATION - $484,000)
    30             (LAND ALLOCATION - $25,000)
    20080S1504B2377                 - 46 -     

     1         (10)  SR 4024, RESURFACING, RESTORATION         1,510,000
     2             (BASE PROJECT ALLOCATION - $1,500,000)
     3             (LAND ALLOCATION - $10,000)
     4         (11)  SR 4031, RESURFACING, RESTORATION         1,254,000
     5             (BASE PROJECT ALLOCATION - $1,200,000)
     6             (LAND ALLOCATION - $54,000)
     7         (12)  SR 4039, RESURFACING, RESTORATION         2,286,000
     8             (BASE PROJECT ALLOCATION - $2,180,000)
     9             (LAND ALLOCATION - $106,000)
    10  SECTION 309.  BUCKS COUNTY.
    11     PROJECTS ARE AS FOLLOWS:
    12         (1)  SR 202, RELOCATION, REALIGNMENT, US
    13             202, PICKERTOWN ROAD TO PA 611,
    14             DOYLESTOWN TOWNSHIP                        87,058,000
    15             (BASE PROJECT ALLOCATION - $49,600,000)
    16             (LAND ALLOCATION - $19,943,000)
    17             (DESIGN AND CONTINGENCIES -
    18             $17,515,000)
    19         (2)  SR 202, WETLAND REPLACEMENT
    20             ENVIRONMENTAL MITIGATION, US 202,
    21             SECTION 700 WETLAND MITIGATION, NEW
    22             BRITAIN TOWNSHIP                           16,070,000
    23             (BASE PROJECT ALLOCATION - $5,600,000)
    24             (LAND ALLOCATION - $1,850,000)
    25             (DESIGN AND CONTINGENCIES - $8,620,000)
    26         (3)  BRIDGETOWN INTERCONNECT PROJECT,
    27             INCLUDING CERTAIN INTERCONNECTION, NEW
    28             SIGNALS AND WIDENING, LOWER SOUTHAMPTON
    29             TOWNSHIP                                    3,210,000
    30             (BASE PROJECT ALLOCATION - $3,210,000)
    20080S1504B2377                 - 47 -     

     1         (4)  I-95, INTERSTATE RESTORATION AND
     2             RECONSTRUCTION                             18,000,000
     3             (BASE PROJECT ALLOCATION - $18,000,000)
     4         (5)  SR 2018, INTERSECTION IMPROVEMENT,
     5             WIDEN AND PROVIDE LEFT LANE                   600,000
     6             (BASE PROJECT ALLOCATION - $600,000)
     7         (6)  SR 202, INTERSECTION IMPROVEMENT, TO
     8             INCLUDE LEFT TURN LANE                        230,000
     9             (LAND ALLOCATION - $100,000)
    10             (DESIGN AND CONTINGENCIES - $130,000)
    11         (7)  SR 2029, INTERSECTION IMPROVEMENT, ADD
    12             TURN LANES                                  2,000,000
    13             (BASE PROJECT ALLOCATION - $2,000,000)
    14         (8)  SR 2033, WIDEN, ADDITIONAL LANES             485,000
    15             (BASE PROJECT ALLOCATION - $485,000)
    16         (9)  SR 2038, WIDEN, ADDITIONAL LANES           4,000,000
    17             (BASE PROJECT ALLOCATION - $4,000,000)
    18         (10)  SR 2038, WIDEN FROM TWO TO FOUR LANES
    19             WITH TURNING LANES, ASSOCIATED
    20             IMPROVEMENTS, SIGNAL UPGRADE                2,309,000
    21             (BASE PROJECT ALLOCATION - $1,369,000)
    22             (LAND ALLOCATION - $120,000)
    23             (DESIGN AND CONTINGENCIES - $820,000)
    24         (11)  SR 4033, RECONSTRUCT - INCLUDING
    25             CURBS, SIDEWALKS AND DRAINAGE               1,400,000
    26             (BASE PROJECT ALLOCATION - $1,400,000)
    27  SECTION 310.  BUTLER COUNTY.
    28     PROJECTS ARE AS FOLLOWS:
    29         (1)  SR 228, ADDITIONAL LANES, REALIGNMENT,
    30             SIMON PROPERTIES PROJECT, PA 228 FROM
    20080S1504B2377                 - 48 -     

     1             SR 3020, FREEDOM ROAD, TO SR 3021,
     2             FRANKLIN ROAD, CRANBERRY TOWNSHIP          19,750,000
     3             (BASE PROJECT ALLOCATION - $16,080,000)
     4             (LAND ALLOCATION - $3,470,000)
     5             (DESIGN AND CONTINGENCIES - $200,000)
     6         (2)  SR 488, PARK AND RIDE LOT EXPANSION,
     7             I-79 AT PA 488, PARK-N-RIDE,
     8             PORTERSVILLE BOROUGH                           83,000
     9             (BASE PROJECT ALLOCATION - $77,000)
    10             (DESIGN AND CONTINGENCIES - $6,000)
    11         (3)  SR 79, RESTORATION, I-79, ALLEGHENY
    12             COUNTY LINE TO SR 3025 INTERCHANGE,
    13             CRANBERRY AND JACKSON TOWNSHIPS               675,000
    14             (BASE PROJECT ALLOCATION - $650,000)
    15             (DESIGN AND CONTINGENCIES - $25,000)
    16         (4)  SR 79, RESTORATION, I-79, SR 3025
    17             INTERCHANGE TO PA 488 INTERCHANGE,
    18             JACKSON, LANCASTER AND MUDDYCREEK
    19             TOWNSHIPS                                     675,000
    20             (BASE PROJECT ALLOCATION - $650,000)
    21             (DESIGN AND CONTINGENCIES - $25,000)
    22         (5)  SR 79, RESTORATION, I-79, PA 488
    23             INTERCHANGE TO LAWRENCE COUNTY LINE,
    24             MUDDYCREEK AND WORTH TOWNSHIPS                675,000
    25             (BASE PROJECT ALLOCATION - $650,000)
    26             (DESIGN AND CONTINGENCIES - $25,000)
    27         (6)  I-79, INTERSTATE RESTORATION AND
    28             RECONSTRUCTION                             26,800,000
    29             (BASE PROJECT ALLOCATION - $26,800,000)
    30         (7)  I-80, INTERSTATE RESTORATION AND
    20080S1504B2377                 - 49 -     

     1             RECONSTRUCTION                              1,700,000
     2             (BASE PROJECT ALLOCATION - $1,700,000)
     3         (8)  SR 422, PAVEMENT RECONSTRUCTION AND
     4             REHABILITATION                                260,000
     5             (BASE PROJECT ALLOCATION - $260,000)
     6         (9)  SR 422, PAVEMENT RECONSTRUCTION AND
     7             REHABILITATION                                260,000
     8             (BASE PROJECT ALLOCATION - $260,000)
     9         (10)  SR 422, PAVEMENT RECONSTRUCTION AND
    10             REHABILITATION                              1,320,000
    11             (BASE PROJECT ALLOCATION - $1,320,000)
    12         (11)  SR 422, PAVEMENT RECONSTRUCTION AND
    13             REHABILITATION                                840,000
    14             (BASE PROJECT ALLOCATION - $840,000)
    15  SECTION 311.  CAMBRIA COUNTY.
    16     PROJECTS ARE AS FOLLOWS:
    17         (1)  SR 1021, ROADWAY REALIGNMENT, SAFETY
    18             IMPROVEMENT, PRELOH HILL CURVE
    19             BEGINNING AT THE INTERSECTION WITH
    20             STOLTZ ROAD, T-523, AND CONTINUES EAST
    21             0.5 MILE, CLEARFIELD TOWNSHIP                 255,000
    22             (BASE PROJECT ALLOCATION - $185,000)
    23             (LAND ALLOCATION - $19,000)
    24             (DESIGN AND CONTINGENCIES - $51,000)
    25         (2)  SR 22, HIGHWAY RECONSTRUCTION,
    26             CONCRETE REHABILITATION, MUNDYS CORNER
    27             TO T-418, CAMBRIA AND JACKSON
    28             TOWNSHIPS                                   3,550,000
    29             (BASE PROJECT ALLOCATION - $3,400,000)
    30             (DESIGN AND CONTINGENCIES - $150,000)
    20080S1504B2377                 - 50 -     

     1         (3)  SR 3007, TRAFFIC STUDIES SAFETY
     2             IMPROVEMENT, GOUCHER STREET FROM
     3             MENOHER BOULEVARD, PA 271, INTERSECTION
     4             TO WESTGATE DRIVE, T-377, WESTMONT
     5             BOROUGH AND LOWER YODER TOWNSHIP              751,000
     6             (BASE PROJECT ALLOCATION - $555,0000)
     7             (LAND ALLOCATION - $96,000)
     8             (DESIGN AND CONTINGENCIES - $100,000)
     9         (4)  SR 56, VARIOUS SAFETY AND MOBILITY
    10             IMPROVEMENTS, PA 56 WEST CORRIDOR,
    11             LOWER YODER TOWNSHIP LINE TO
    12             INTERSECTION OF WASHINGTON STREET, CITY
    13             OF JOHNSTOWN                                  950,000
    14             (BASE PROJECT ALLOCATION - $630,000)
    15             (LAND ALLOCATION - $140,000)
    16             (DESIGN AND CONTINGENCIES - $180,000)
    17         (5)  SR 869, ROADWAY REALIGNMENT, CURVE
    18             ADJUSTMENT SAFETY IMPROVEMENT, BEAVER
    19             RUN CURVE FROM FOREST STREET, T-503, TO
    20             VILLAGE OF BEAVERDALE, ADAMS AND CROYLE
    21             TOWNSHIPS                                     360,000
    22             (BASE PROJECT ALLOCATION - $300,000)
    23             (LAND ALLOCATION - $30,000)
    24             (DESIGN AND CONTINGENCIES - $30,000)
    25         (6)  SR 219, CONCRETE PAVEMENT RESTORATION
    26             AND OVERLAY                                 1,620,000
    27             (BASE PROJECT ALLOCATION - $1,620,000)
    28         (7)  SR 219, CONCRETE PAVEMENT RESTORATION
    29             AND OVERLAY                                 6,875,000
    30             (DESIGN AND CONTINGENCIES - $6,875,000)
    20080S1504B2377                 - 51 -     

     1         (8)  SR 219, CONCRETE PAVEMENT RESTORATION
     2             AND OVERLAY                                 4,000,000
     3             (DESIGN AND CONTINGENCIES - $4,000,000)
     4         (9)  SR 22, CONCRETE PAVEMENT RESTORATION
     5             AND OVERLAY                                 3,000,000
     6             (BASE PROJECT ALLOCATION - $3,000,000)
     7         (10)  SR 22, CONCRETE PAVEMENT RESTORATION
     8             AND OVERLAY                                 8,228,000
     9             (BASE PROJECT ALLOCATION - $8,228,000)
    10         (11)  SR 3024, RESURFACING AND
    11             RECONSTRUCTION OF RETAINING WALL
    12             SYSTEM                                      2,250,000
    13             (DESIGN AND CONTINGENCIES - $2,250,000)
    14  SECTION 312.  CAMERON COUNTY (RESERVED).
    15  SECTION 313.  CARBON COUNTY.
    16     PROJECTS ARE AS FOLLOWS:
    17         (1)  SR 80, INSTALL DYNAMIC MESSAGE SIGNS
    18             AND CLOSED CIRCUIT TELEVISION CAMERAS,
    19             I-80 CORRIDOR, ROUND 1, VARIOUS
    20             MUNICIPALITIES                                420,000
    21             (BASE PROJECT ALLOCATION - $200,000)
    22             (DESIGN AND CONTINGENCIES - $220,000)
    23         (2)  SR 80, INSTALL DYNAMIC MESSAGE SIGNS,
    24             CLOSED CIRCUIT TELEVISION CAMERAS,
    25             HIGHWAY ADVISORY RADIO AND HIGHWAY
    26             ADVISORY RADIO BEACONS, I-80 CORRIDOR,
    27             ROUND 2, VARIOUS MUNICIPALITIES               390,000
    28             (BASE PROJECT ALLOCATION - $205,000)
    29             (DESIGN AND CONTINGENCIES - $185,000)
    30         (3)  SR 8004, LENGTHEN RAMP, RUMBLE STRIPS,
    20080S1504B2377                 - 52 -     

     1             WHITE TOPPING, FLASHING WARNING DEVICE,
     2             I-80 OFF RAMP EXTENSION, EAST SIDE
     3             BOROUGH                                       550,000
     4             (BASE PROJECT ALLOCATION - $250,000)
     5             (LAND ALLOCATION - $150,000)
     6             (DESIGN AND CONTINGENCIES - $150,000)
     7         (4)  SR 80, INSTALLATION OF 0.10 MILEPOST
     8             MARKERS ON INTERSTATES AND EXPRESSWAYS,
     9             NEPA MILE POST MARKERS, VARIOUS
    10             MUNICIPALITIES                                304,000
    11             (BASE PROJECT ALLOCATION - $13,000)
    12             (DESIGN AND CONTINGENCIES - $291,000)
    13         (5)  I-80, INTERSTATE RESTORATION AND
    14             RECONSTRUCTION                              9,600,000
    15             (BASE PROJECT ALLOCATION - $9,600,000)
    16         (6)  VARIOUS, REHABILITATION, RESTORATION
    17             OR RECONSTRUCTION OF VARIOUS HIGHWAYS      12,175,000
    18             (BASE PROJECT ALLOCATION - $9,131,000)
    19             (LAND ALLOCATION - $3,044,000)
    20  SECTION 314.  CENTRE COUNTY.
    21     PROJECTS ARE AS FOLLOWS:
    22         (1)  SR 144, RETAINING WALL RECONSTRUCTION,
    23             LINN STREET, SECTION 320, BELLEFONTE
    24             BOROUGH                                     1,400,000
    25             (BASE PROJECT ALLOCATION - $1,400,000)
    26         (2)  SR 26, SAFETY IMPROVEMENT, PINE GROVE
    27             MOUNTAIN, FERGUSON TOWNSHIP                   260,000
    28             (BASE PROJECT ALLOCATION - $210,000)
    29             (LAND ALLOCATION - $10,000)
    30             (DESIGN AND CONTINGENCIES - $40,000)
    20080S1504B2377                 - 53 -     

     1         (3)  SR 3018, SAFETY IMPROVEMENT, ATHERTON
     2             AND UNIVERSITY DRIVE, STATE COLLEGE
     3             BOROUGH                                     1,175,000
     4             (BASE PROJECT ALLOCATION - $1,000,000)
     5             (LAND ALLOCATION - $75,000)
     6             (DESIGN AND CONTINGENCIES - $100,000)
     7         (4)  SR 322, SAFETY IMPROVEMENT AND
     8             CONGESTION REDUCTION, US 322 CORRIDOR
     9             SAFETY IMPROVEMENT, HARRIS AND POTTER
    10             TOWNSHIPS                                     360,000
    11             (BASE PROJECT ALLOCATION - $300,000)
    12             (LAND ALLOCATION - $10,000)
    13             (DESIGN AND CONTINGENCIES - $50,000)
    14         (5)  SR 350, SAFETY IMPROVEMENT, SR 350
    15             CURVE IMPROVEMENT AND TRUCK PULL OFF,
    16             RUSH AND TAYLOR TOWNSHIPS                     925,000
    17             (BASE PROJECT ALLOCATION - $800,00)
    18             (LAND ALLOCATION - $25,000)
    19             (DESIGN AND CONTINGENCIES - $100,000)
    20         (6)  SR 45, HIGHWAY RESTORATION, ADD
    21             TURNING LANE, TURN LANE AT SR 45 AND SR
    22             144, POTTER TOWNSHIP                        5,140,000
    23             (BASE PROJECT ALLOCATION - $3,640,000)
    24             (LAND ALLOCATION - $1,300,000)
    25             (DESIGN AND CONTINGENCIES - $200,000)
    26         (7)  SR 550, ADD THIRD LANE, CONGESTION
    27             REDUCTION, PA 550 THIRD SEGMENT 440,
    28             BELLEFONTE BOROUGH AND SPRING TOWNSHIP      4,325,000
    29             (BASE PROJECT ALLOCATION - $3,245,000)
    30             (LAND ALLOCATION - $545,000)
    20080S1504B2377                 - 54 -     

     1             (DESIGN AND CONTINGENCIES - $535,000)
     2         (8)  SR 80, ACID ROCK DISCHARGE MITIGATION,
     3             JONATHON RUN, I-80 AND SR 144, BOGGS
     4             AND SNOW SHOE TOWNSHIPS                     1,320,000
     5             (BASE PROJECT ALLOCATION - $1,300,000)
     6             (LAND ALLOCATION - $20,000)
     7         (9)  SR 80, PAVEMENT RESTORATION,
     8             REHABILITATION, INTERSTATE IMPROVEMENT,
     9             I-80 CORRIDOR, BOGGS, RUSH AND SNOW
    10             SHOE TOWNSHIPS                              1,530,000
    11             (BASE PROJECT ALLOCATION - $1,500,000)
    12             (DESIGN AND CONTINGENCIES - $30,000)
    13         (10)  VARIOUS ROUTES, REGIONAL ITS
    14             INITIATIVES, REGIONAL ITS OPERATIONS
    15             PLAN, VARIOUS MUNICIPALITIES                  500,000
    16             (BASE PROJECT ALLOCATION - $500,000)
    17         (11)  SR 3014, RETIMING AND COORDINATING OF
    18             18 SIGNALS, SAFETY IMPROVEMENT,
    19             ATHERTON STREET CORRIDOR, VALLEY VISTA
    20             TO BEAVER AVENUE, STATE COLLEGE BOROUGH
    21             AND FERGUSON AND PATTON TOWNSHIPS             400,000
    22             (BASE PROJECT ALLOCATION - $300,000)
    23             (LAND ALLOCATION - $25,000)
    24             (DESIGN AND CONTINGENCIES - $75,000)
    25         (12)  I-80, INTERSTATE RESTORATION AND
    26             RECONSTRUCTION                             31,800,000
    27             (BASE PROJECT ALLOCATION - $31,800,000)
    28         (13)  SR 150, CONGESTED CORRIDOR
    29             IMPROVEMENTS, SAFETY IMPROVEMENTS           1,237,000
    30             (BASE PROJECT ALLOCATION - $1,143,000)
    20080S1504B2377                 - 55 -     

     1             (LAND ALLOCATION - $52,000)
     2             (DESIGN AND CONTINGENCIES - $42,000)
     3         (14)  SR 45, PARK AND RIDE LOT                    777,000
     4             (BASE PROJECT ALLOCATION - $672,000)
     5             (LAND ALLOCATION - $42,000)
     6             (DESIGN AND CONTINGENCIES - $63,000)
     7  SECTION 315.  CHESTER COUNTY.
     8     PROJECTS ARE AS FOLLOWS:
     9         (1)  SR 30, RECONSTRUCTION, US 30, PA 10 TO
    10             EXTON BYPASS, VARIOUS MUNICIPALITIES       80,515,000
    11             (BASE PROJECT ALLOCATION - $77,200,000)
    12             (LAND ALLOCATION - $1,000,000)
    13             (DESIGN AND CONTINGENCIES - $2,315,000)
    14         (2)  SR 1, ADD LANES AND WIDEN TO SIX
    15             LANES                                       3,800,000
    16             (BASE PROJECT ALLOCATION - $3,800,000)
    17         (3)  SR 100, WIDEN AND ADD LANES, TO
    18             PROVIDE THREE LANES NORTHBOUND AND
    19             SOUTHBOUND                                 21,586,000
    20             (BASE PROJECT ALLOCATION - $21,586,000)
    21         (4)  SR 29, ADD LANE                            5,370,000
    22             (BASE PROJECT ALLOCATION - $5,370,000)
    23         (5)  SR 30, INTERSECTION IMPROVEMENT, ADD
    24             TURN LANES, WIDEN AND SIGNALS                 700,000
    25             (BASE PROJECT ALLOCATION - $700,000)
    26         (6)  SR 41, RECONSTRUCT - TRANSPORTATION
    27             STUDY                                      10,000,000
    28             (BASE PROJECT ALLOCATION - $8,000,000)
    29             (LAND ALLOCATION - $2,000,000)
    30         (7)  SR 52, RELOCATION, NEW ROADWAY             3,800,000
    20080S1504B2377                 - 56 -     

     1             (BASE PROJECT ALLOCATION - $3,800,000)
     2         (8)  US 30, PEDESTRIAN FACILITIES -
     3             REALIGNMENT AND WIDENING TO ACCOMMODATE
     4             PROPOSED RELOCATION                           600,000
     5             (LAND ALLOCATION - $600,000)
     6  SECTION 316.  CLARION COUNTY.
     7     PROJECTS ARE AS FOLLOWS:
     8         (1)  I-81, PREVENTIVE MAINTENANCE, PA 478
     9             INTERCHANGE TO SR 3007 INTERCHANGE,
    10             CLARION, WEST I-80, MILL AND FILL,
    11             BEAVER AND RICHLAND TOWNSHIPS                 480,000
    12             (BASE PROJECT ALLOCATION - $450,000)
    13             (DESIGN AND CONTINGENCIES - $30,000)
    14         (2)  SR 322, DRAINAGE, CURBING,
    15             RESTORATION, US 322 FROM SR 208 TO
    16             STATION ROAD, SHIPPENVILLE BOROUGH AND
    17             ELK TOWNSHIP                                  850,000
    18             (BASE PROJECT ALLOCATION - $850,000)
    19         (3)  I-80, INTERSTATE RESTORATION AND
    20             RECONSTRUCTION                             27,800,000
    21             (BASE PROJECT ALLOCATION - $27,800,000)
    22         (4)  SR 208, SAFETY AND INTERSECTION
    23             IMPROVEMENTS - ADD TURNING LANES AND
    24             INSTALL A NEW SIGNAL                          182,000
    25             (BASE PROJECT ALLOCATION - $173,000)
    26             (DESIGN AND CONTINGENCIES - $9,000)
    27         (5)  SR 322, PAVEMENT RECONSTRUCTION AND
    28             REHABILITATION                                360,000
    29             (BASE PROJECT ALLOCATION - $360,000)
    30         (6)  SR 66, PAVEMENT RECONSTRUCTION AND
    20080S1504B2377                 - 57 -     

     1             REHABILITATION                              1,580,000
     2             (BASE PROJECT ALLOCATION - $1,580,000)
     3  SECTION 317.  CLEARFIELD COUNTY.
     4     PROJECTS ARE AS FOLLOWS:
     5         (1)  SR 219, REALIGNMENT AND SIGNAL
     6             INSTALLATION, INTERSECTION OF SR 219
     7             AND SR 119, BRADY TOWNSHIP                    225,000
     8             (BASE PROJECT ALLOCATION - $160,000)
     9             (LAND ALLOCATION - $25,000)
    10             (DESIGN AND CONTINGENCIES - $40,000)
    11         (2)  SR 255, SIGNAL TIMING PROJECT
    12             IMPROVEMENTS AT 12 SIGNALIZED
    13             INTERSECTIONS, DUBOIS AVENUE FROM
    14             DUBOIS STREET TO DUBOIS MALL, SANDY
    15             TOWNSHIP AND CITY OF DUBOIS                 1,084,000
    16             (BASE PROJECT ALLOCATION - $695,000)
    17             (LAND ALLOCATION - $286,000)
    18             (DESIGN AND CONTINGENCIES - $103,000)
    19         (3)  SR 53, RESURFACING, SIGNAL, ADD
    20             TURNING LANE, NINTH STREET
    21             INTERSECTION, SR 53 AND SR 2043, MORRIS
    22             TOWNSHIP                                      800,000
    23             (BASE PROJECT ALLOCATION - $650,000)
    24             (LAND ALLOCATION - $50,000)
    25             (DESIGN AND CONTINGENCIES - $100,000)
    26         (4)  SR 53, CENTER LINE RUMBLE STRIPS,
    27             SAFETY IMPROVEMENT, SR 53 CORRIDOR,
    28             VARIOUS MUNICIPALITIES                         54,000
    29             (BASE PROJECT ALLOCATION - $54,000)
    30         (5)  VARIOUS ROUTES, REGIONAL ITS
    20080S1504B2377                 - 58 -     

     1             INITIATIVES, REGIONAL ITS OPERATIONS
     2             PLAN, VARIOUS MUNICIPALITIES                  500,000
     3             (BASE PROJECT ALLOCATION - $500,000)
     4         (6)  I-80, INTERSTATE RESTORATION AND
     5             RECONSTRUCTION                             41,200,000
     6             (BASE PROJECT ALLOCATION - $41,200,000)
     7         (7)  SR 4019, RECONSTRUCTION, REALIGNING OF
     8             HOSPITAL AVENUE TO THE WEST                   450,000
     9             (BASE PROJECT ALLOCATION - $450,000)
    10  SECTION 318.  CLINTON COUNTY.
    11     PROJECTS ARE AS FOLLOWS:
    12         (1)  SR 220, NEW INTERCHANGE WITH BRIDGE
    13             AND SAFETY IMPROVEMENTS, AUCTION ROAD,
    14             SR 220, SEGMENT 30 AND SR 2008, SEGMENT
    15             50, LAMAR TOWNSHIP                            925,000
    16             (BASE PROJECT ALLOCATION - $800,000)
    17             (LAND ALLOCATION - $25,000)
    18             (DESIGN AND CONTINGENCIES - $100,000)
    19         (2)  VARIOUS ROUTES, REGIONAL ITS
    20             INITIATIVES, REGIONAL ITS OPERATIONS
    21             PLAN, VARIOUS MUNICIPALITIES                  500,000
    22             (BASE PROJECT ALLOCATION - $500,00)
    23         (3)  SR 80, PAVEMENT RESTORATION,
    24             REHABILITATION AND BRIDGE PARAPETS, I-
    25             80 CORRIDOR, GREENE, LAMAR, MARION AND
    26             PORTER TOWNSHIPS                            2,530,000
    27             (BASE PROJECT ALLOCATION - $2,500,000)
    28             (DESIGN AND CONTINGENCIES - $30,000)
    29         (4)  SR 120, ACCESS ROAD FOR FIRST QUALITY
    30             TISSUE PLANT, CASTENEA TOWNSHIP AND
    20080S1504B2377                 - 59 -     

     1             LOCK HAVEN CITY                             8,750,000
     2             (BASE PROJECT ALLOCATION - $8,000,000)
     3             (LAND ALLOCATION - $500,000)
     4             (DESIGN AND CONTINGENCIES - $250,000)
     5         (5)  I-80, INTERSTATE RESTORATION AND
     6             RECONSTRUCTION                             23,500,000
     7             (BASE PROJECT ALLOCATION - $23,500,000)
     8  SECTION 319.  COLUMBIA COUNTY.
     9     PROJECTS ARE AS FOLLOWS:
    10         (1)  SR 11, PAVEMENT RECONSTRUCTION,
    11             REHABILITATION, SR 11, SEGMENT 380 TO
    12             SEGMENT 431, BERWICK BOROUGH                   30,000
    13             (DESIGN AND CONTINGENCIES - $30,000)
    14         (2)  SR 42, CONCRETE AND PAVEMENT
    15             RECONSTRUCTION, REHABILITATION, SR 42
    16             FROM I-80 INTERCHANGE TO MALL,
    17             INCLUDING RAMPS, HEMLOCK TOWNSHIP           1,098,000
    18             (BASE PROJECT ALLOCATION - $1,058,000)
    19             (DESIGN AND CONTINGENCIES - $40,000)
    20         (3)  I-80, INTERSTATE RESTORATION AND
    21             RECONSTRUCTION                             18,800,000
    22             (BASE PROJECT ALLOCATION - $18,800,000)
    23         (4)  SR 1019, RESURFACING, RESTORATION            415,000
    24             (BASE PROJECT ALLOCATION - $405,000)
    25             (LAND ALLOCATION - $10,000)
    26         (5)  SR 4009, RESURFACING, RESTORATION            880,000
    27             (BASE PROJECT ALLOCATION - $870,000)
    28             (LAND ALLOCATION - $10,000)
    29         (6)  SR 42, RESURFACING, RESTORATION            1,810,000
    30             (BASE PROJECT ALLOCATION - $1,800,000)
    20080S1504B2377                 - 60 -     

     1             (LAND ALLOCATION - $10,000)
     2         (7)  SR 42, RESURFACING, RESTORATION            2,270,000
     3             (BASE PROJECT ALLOCATION - $2,260,000)
     4             (LAND ALLOCATION - $10,000)
     5         (8)  SR 42, RESURFACING, RESTORATION            1,710,000
     6             (BASE PROJECT ALLOCATION - $1,700,000)
     7             (LAND ALLOCATION - $10,000)
     8         (9)  SR 487, RESURFACING, RESTORATION             960,000
     9             (BASE PROJECT ALLOCATION - $950,000)
    10             (LAND ALLOCATION - $10,000)
    11         (10)  SR 487, RESURFACING, RESTORATION            910,000
    12             (BASE PROJECT ALLOCATION - $900,000)
    13             (LAND ALLOCATION - $10,000)
    14  SECTION 320.  CRAWFORD COUNTY.
    15     PROJECTS ARE AS FOLLOWS:
    16         (1)  I-79, INTERSTATE RESTORATION AND
    17             RECONSTRUCTION                             27,140,000
    18             (BASE PROJECT ALLOCATION - $27,140,000)
    19         (2)  PA 27, CORRIDOR SAFETY IMPROVEMENT,
    20             FLATTEN RELOCATE CURVE                        165,000
    21             (BASE PROJECT ALLOCATION - $76,000)
    22             (LAND ALLOCATION - $11,000)
    23             (DESIGN AND CONTINGENCIES - $78,000)
    24         (3)  SR 198, RELOCATION AND REALIGNMENT,
    25             IMPROVE TURNING RADII, SURFACE
    26             IMPROVEMENTS AND DRAINAGE                     480,000
    27             (BASE PROJECT ALLOCATION - $400,000)
    28             (LAND ALLOCATION - $52,000)
    29             (DESIGN AND CONTINGENCIES - $28,000)
    30         (4)  SR 6, CONCRETE PAVEMENT RESTORATION
    20080S1504B2377                 - 61 -     

     1             AND OVERLAY                                 1,533,000
     2             (BASE PROJECT ALLOCATION - $1,533,000)
     3  SECTION 321.  CUMBERLAND COUNTY.
     4     PROJECTS ARE AS FOLLOWS:
     5         (1)  I-81, INTERSTATE RESTORATION AND
     6             RECONSTRUCTION                             38,200,000
     7             (BASE PROJECT ALLOCATION - $38,200,000)
     8         (2)  I-83, INTERSTATE RESTORATION AND
     9             RECONSTRUCTION                              1,700,000
    10             (BASE PROJECT ALLOCATION - $1,700,000)
    11         (3)  SR 465, INTERCHANGE IMPROVEMENT           10,411,000
    12             (BASE PROJECT ALLOCATION - $10,411,000)
    13  SECTION 322.  DAUPHIN COUNTY.
    14     PROJECTS ARE AS FOLLOWS:
    15         (1)  SR 83, WIDEN, ADD LANE, INTERCHANGE
    16             IMPROVEMENT, RECONSTRUCT, I-83, EAST
    17             SHORE, SECTION 1 FROM EISENHOWER
    18             INTERCHANGE TO I-81, LOWER PAXTON,
    19             SUSQUEHANNA AND SWATARA TOWNSHIPS           2,062,000
    20             (LAND ALLOCATION - $1,262,000)
    21             (DESIGN AND CONTINGENCIES - $800,000)
    22         (2)  I-283, INTERSTATE RESTORATION AND
    23             RECONSTRUCTION                              2,500,000
    24             (BASE PROJECT ALLOCATION - $2,500,000)
    25         (3)  I-81, INTERSTATE RESTORATION AND
    26             RECONSTRUCTION                             16,000,000
    27             (BASE PROJECT ALLOCATION - $16,000,000)
    28         (4)  I-83, INTERSTATE RESTORATION AND
    29             RECONSTRUCTION                              8,400,000
    30             (BASE PROJECT ALLOCATION - $8,400,000)
    20080S1504B2377                 - 62 -     

     1         (5)  SR 422, INTERSECTION IMPROVEMENTS,
     2             WIDEN, ADD TURNING LANES AND TRAFFIC
     3             SIGNALS                                     6,193,000
     4             (BASE PROJECT ALLOCATION - $3,836,000)
     5             (DESIGN AND CONTINGENCIES - $2,357,000)
     6  SECTION 323.  DELAWARE COUNTY.
     7     PROJECTS ARE AS FOLLOWS:
     8         (1)  SR 2028, CHANNELIZATION AND VERTICAL
     9             CLEAR IMPROVEMENTS, CORRIDOR SAFETY
    10             IMPROVEMENT, NEW TRAFFIC SIGNAL,
    11             CHESTNUT STREET AND MORTON AVENUE, 10TH
    12             TO 12TH STREETS, CITY OF CHESTER            1,300,000
    13             (BASE PROJECT ALLOCATION - $1,000,000)
    14             (LAND ALLOCATION - $60,000)
    15             (DESIGN AND CONTINGENCIES - $240,000)
    16         (2)  SR 3018, NEW ROADWAY, BRIDGEWATER ROAD
    17             EXTENSION, BROOKHAVEN BOROUGH AND ASTON
    18             TOWNSHIP                                    2,040,000
    19             (BASE PROJECT ALLOCATION - $1,800,000)
    20             (LAND ALLOCATION - $240,000)
    21         (3)  I-476, INTERSTATE RESTORATION AND
    22             RECONSTRUCTION                             14,000,000
    23             (BASE PROJECT ALLOCATION - $14,000,000)
    24         (4)  I-95, INTERSTATE RESTORATION AND
    25             RECONSTRUCTION                             11,000,000
    26             (BASE PROJECT ALLOCATION - $11,000,000)
    27  SECTION 324.  ELK COUNTY.
    28     PROJECTS ARE AS FOLLOWS:
    29         (1)  SR 255, HIGHWAY RESTORATION, DRAINAGE,
    30             GUIDE RAIL AND CONCRETE PAVEMENT
    20080S1504B2377                 - 63 -     

     1             RECONSTRUCTION, REHABILITATION, SR 255,
     2             MILLION DOLLAR HIGHWAY, SEGMENT 0230 TO
     3             SEGMENT 0280, CITY OF ST. MARYS             4,915,000
     4             (BASE PROJECT ALLOCATION - $4,785,000)
     5             (LAND ALLOCATION - $50,000)
     6             (DESIGN AND CONTINGENCIES - $80,000)
     7         (2)  SR 255, UPDATE SIGNALS, SAFETY
     8             IMPROVEMENT, VINE AND ARCH STREET
     9             SIGNALS, CITY OF ST. MARYS                    175,000
    10             (BASE PROJECT ALLOCATION - $100,000)
    11             (LAND ALLOCATION - $25,000)
    12             (DESIGN AND CONTINGENCIES - $50,000)
    13  SECTION 325.  ERIE COUNTY.
    14     PROJECTS ARE AS FOLLOWS:
    15         (1)  SR 19, INTERSECTION IMPROVEMENTS,
    16             WATERFORD AT SR 19 AND SR 97, WATERFORD
    17             BOROUGH AND WATERFORD TOWNSHIP                335,000
    18             (BASE PROJECT ALLOCATION - $200,000)
    19             (LAND ALLOCATION - $60,000)
    20             (DESIGN AND CONTINGENCIES - $75,000)
    21         (2)  SR 8, SAFETY IMPROVEMENT STUDY, SR 8,
    22             PARADE STREET AT 28TH STREET
    23             INTERSECTION, CITY OF ERIE                    200,000
    24             (BASE PROJECT ALLOCATION - $100,00)
    25             (LAND ALLOCATION - $20,000)
    26             (DESIGN AND CONTINGENCIES - $80,000)
    27         (3)  VARIOUS ROUTES, CONSTRUCTION AND
    28             COORDINATION OF AN ITS COMMAND CENTER,
    29             ERIE ITS INITIATIVE, VARIOUS
    30             MUNICIPALITIES                                300,000
    20080S1504B2377                 - 64 -     

     1             (BASE PROJECT ALLOCATION - $200,00)
     2             (DESIGN AND CONTINGENCIES - $100,000)
     3         (4)  I-79, INTERSTATE RESTORATION AND
     4             RECONSTRUCTION                             19,000,000
     5             (BASE PROJECT ALLOCATION - $19,000,000)
     6         (5)  I-86, INTERSTATE RESTORATION AND
     7             RECONSTRUCTION                              6,500,000
     8             (BASE PROJECT ALLOCATION - $6,500,000)
     9         (6)  I-90, INTERSTATE RESTORATION AND
    10             RECONSTRUCTION                             46,000,000
    11             (BASE PROJECT ALLOCATION - $46,000,000)
    12  SECTION 326.  FAYETTE COUNTY.
    13     PROJECTS ARE AS FOLLOWS:
    14         (1)  SR 119, HIGHWAY RESTORATION, SR 119
    15             FROM EVERSON TO WEST COUNTY LINE,
    16             BULLSKIN AND UPPER TYRONE TOWNSHIPS         5,100,000
    17             (BASE PROJECT ALLOCATION - $5,100,000)
    18         (2)  SR 166, EXISTING SIGNAL IMPROVEMENT,
    19             SR 166 AT NEW SALEM ROAD, LUZERNE
    20             TOWNSHIP                                      290,000
    21             (BASE PROJECT ALLOCATION - $150,000)
    22             (LAND ALLOCATION - $40,000)
    23             (DESIGN AND CONTINGENCIES - $100,000)
    24         (3)  SR 21, HIGHWAY RESTORATION, SR 21 FROM
    25             FOOTDALE ROAD TO DUCK HOLLOW ROAD,
    26             GERMAN, MENALLEN AND SOUTH UNION
    27             TOWNSHIPS                                   3,000,000
    28             (BASE PROJECT ALLOCATION - $3,000,000)
    29         (4)  SR 40, HIGHWAY RESTORATION, SR 40 FROM
    30             FARMINGTON TO DINNERBELL ROAD, WHARTON
    20080S1504B2377                 - 65 -     

     1             TOWNSHIP                                    3,200,000
     2             (BASE PROJECT ALLOCATION - $3,200,000)
     3         (5)  SR 51, HIGHWAY RESTORATION, SR 51 FROM
     4             SR 4046 TO WESTMORELAND COUNTY LINE,
     5             PERRYOPOLIS BOROUGH AND PERRY TOWNSHIP      5,200,000
     6             (BASE PROJECT ALLOCATION - $5,200,000)
     7         (6)  SR 88, HIGHWAY RECONSTRUCTION, MAIN
     8             STREET, POINT MARION, POINT MARION
     9             BOROUGH                                       458,000
    10             (BASE PROJECT ALLOCATION - $200,000)
    11             (LAND ALLOCATION - $58,000)
    12             (DESIGN AND CONTINGENCIES - $200,000)
    13         (7)  SR 119, EXISTING SIGNAL IMPROVEMENT          537,000
    14             (BASE PROJECT ALLOCATION - $433,000)
    15             (DESIGN AND CONTINGENCIES - $104,000)
    16         (8)  SR 21, INTERSECTION IMPROVEMENT, ADD
    17             TURNING LANES                                 206,000
    18             (BASE PROJECT ALLOCATION - $109,000)
    19             (LAND ALLOCATION - $42,000)
    20             (DESIGN AND CONTINGENCIES - $55,000)
    21         (9)  SR 40, INTERSECTION IMPROVEMENT              284,000
    22             (BASE PROJECT ALLOCATION - $226,000)
    23             (LAND ALLOCATION - $26,000)
    24             (DESIGN AND CONTINGENCIES - $32,000)
    25         (10)  SR 711, TRUCK TRAFFIC STUDY,
    26             RESTORATION OR NEW TRUCK PULL-OFFS AND
    27             ESCAPE RAMP, POSSIBLE RELOCATIONS TRUCK
    28             TRAFFIC                                     2,926,000
    29             (BASE PROJECT ALLOCATION - $2,250,000)
    30             (LAND ALLOCATION - $416,000)
    20080S1504B2377                 - 66 -     

     1             (DESIGN AND CONTINGENCIES - $260,000)
     2  SECTION 327.  FOREST COUNTY.
     3     PROJECTS ARE AS FOLLOWS:
     4         (1)  SR 66, HIGHWAY RESTORATION                   611,000
     5             (BASE PROJECT ALLOCATION - $611,000)
     6  SECTION 328.  FRANKLIN COUNTY.
     7     PROJECTS ARE AS FOLLOWS:
     8         (1)  SR 11, INTERSECTION IMPROVEMENTS,
     9             WIDENING, TURNING LANES, SIGNAL UPDATES
    10             AND RESURFACING, ANTRIM WAY
    11             INTERSECTION, US 11 AND PA 16,
    12             GREENCASTLE BOROUGH AND ANTRIM
    13             TOWNSHIP                                    1,725,000
    14             (BASE PROJECT ALLOCATION - $1,725,000)
    15         (2)  ROUTE 11, INTERSECTION IMPROVEMENT OF
    16             ROUTE 11 AND ROUTE 997, GREENE
    17             TOWNSHIP                                    1,200,000
    18         (3)  I-81, INTERSTATE RESTORATION AND
    19             RECONSTRUCTION                             25,000,000
    20             (BASE PROJECT ALLOCATION - $25,000,000)
    21  SECTION 329.  FULTON COUNTY.
    22     PROJECTS ARE AS FOLLOWS:
    23         (1)  SR 16, INTERSECTION AND TURN LANE
    24             IMPROVEMENT, PA 6 AND JLG DRIVE, AYR
    25             TOWNSHIP                                      170,000
    26             (BASE PROJECT ALLOCATION - $170,000)
    27         (2)  SR 522, INTERSECTION AND CURVE
    28             IMPROVEMENTS, SAFETY IMPROVEMENT, US
    29             522 FROM TIMBER RIDGE ROAD, SR 2005, TO
    30             SOUTH OF GEM ROAD, SR 2003, BELFAST
    20080S1504B2377                 - 67 -     

     1             TOWNSHIP                                      700,000
     2             (BASE PROJECT ALLOCATION - $600,000)
     3             (LAND ALLOCATION - $20,000)
     4             (DESIGN AND CONTINGENCIES - $80,000)
     5         (3)  SR 70, CULVERT REPLACEMENT, DRAINAGE
     6             IMPROVEMENT, I-70 OVER TRIBUTARY OF
     7             LITTLE TONOLOWAY CREEK, BETHEL
     8             TOWNSHIP                                      605,000
     9             (BASE PROJECT ALLOCATION - $500,000)
    10             (DESIGN AND CONTINGENCIES - $105,000)
    11         (4)  SR 70, RESTORATION, REHABILITATION,
    12             SAFETY IMPROVEMENTS, I-70 EASTBOUND,
    13             BEDFORD COUNTY, AMARANTH, BRUSH CREEK
    14             AND UNION TOWNSHIPS                           900,000
    15             (BASE PROJECT ALLOCATION - $900,000)
    16         (5)  SR 70, RESTORATION, REHABILITATION,
    17             SAFETY IMPROVEMENTS, I-70 AMARANTH TO
    18             MARYLAND LINE, BETHEL, BRUSH CREEK AND
    19             UNION TOWNSHIPS                             1,420,000
    20             (BASE PROJECT ALLOCATION - $1,420,000)
    21         (6)  I-70, INTERSTATE RESTORATION AND
    22             RECONSTRUCTION                             19,600,000
    23             (BASE PROJECT ALLOCATION - $19,600,000)
    24         (7)  SR 30, CONCRETE PAVEMENT RESTORATION
    25             AND OVERLAY                                 3,600,000
    26             (BASE PROJECT ALLOCATION - $3,600,000)
    27  SECTION 330.  GREENE COUNTY.
    28     PROJECTS ARE AS FOLLOWS:
    29         (1)  SR 21, HIGHWAY RESTORATION, PA 21 FROM
    30             SR 4017 TO PA 18, CENTER TOWNSHIP           4,700,000
    20080S1504B2377                 - 68 -     

     1             (BASE PROJECT ALLOCATION - $4,700,000)
     2         (2)  SR 21, HIGHWAY RESTORATION, SR 21 FROM
     3             JUNCTION DELI TO PAISLEY, CUMBERLAND
     4             AND MONONGAHELA TOWNSHIPS                   3,500,000
     5             (BASE PROJECT ALLOCATION - $3,500,000)
     6         (3)  SR 21, HIGHWAY RESTORATION, SR 21 FROM
     7             PAISLEY TO MASONTOWN BRIDGE, CUMBERLAND
     8             AND MONONGAHELA TOWNSHIPS                   4,800,000
     9             (BASE PROJECT ALLOCATION - $4,800,000)
    10         (4)  SR 79, INTERSTATE RECONSTRUCTION, I-79
    11             NO.2 FROM MILEPOST 0 TO MILEPOST 14,
    12             FRANKLIN AND WHITELEY TOWNSHIPS             3,255,000
    13             (BASE PROJECT ALLOCATION - $3,000,000)
    14             (DESIGN AND CONTINGENCIES - $255,000)
    15         (5)  SR 79, CONCRETE PAVEMENT
    16             RECONSTRUCTION, REHABILITATION, I-79
    17             NO.1 FROM MILEPOST 0 TO MILEPOST 14,
    18             FRANKLIN, PERRY AND WHITELEY TOWNSHIPS      3,000,000
    19             (BASE PROJECT ALLOCATION - $2,500,000)
    20             (DESIGN AND CONTINGENCIES - $500,000)
    21         (6)  SR 79, RESURFACING, SMOOTHER ROADS, I-
    22             79, FRANKLIN, WASHINGTON AND WHITELEY
    23             TOWNSHIPS                                  12,750,000
    24             (BASE PROJECT ALLOCATION - $12,750,000)
    25         (7)  SR 79, RECONSTRUCTION OF MAINLINE, I-
    26             79, SEGMENT 0174 TO SEGMENT 0210 AND
    27             SEGMENT 0175 TO SEGMENT 0211,
    28             WASHINGTON TOWNSHIP                         1,680,000
    29             (BASE PROJECT ALLOCATION - $1,500,000)
    30             (DESIGN AND CONTINGENCIES - $180,000)
    20080S1504B2377                 - 69 -     

     1         (8)  SR 79, INTERSTATE RECONSTRUCTION, I-
     2             79, SEGMENT 0064 TO SEGMENT 0114 AND
     3             SEGMENT 0065 TO SEGMENT 0115, IN AREA
     4             OF LONGWALL MINING, FRANKLIN AND
     5             WHITELEY TOWNSHIPS                          2,800,000
     6             (BASE PROJECT ALLOCATION - $2,600,000)
     7             (DESIGN AND CONTINGENCIES - $200,000)
     8         (9)  SR 88, HIGHWAY RESTORATION, SR 88 FROM
     9             POINT MARION TO DILLINER, DUNKARD AND
    10             MONONGAHELA TOWNSHIPS                       4,300,000
    11             (BASE PROJECT ALLOCATION - $4,300,000)
    12         (10)  I-79, INTERSTATE RESTORATION AND
    13             RECONSTRUCTION                             21,400,000
    14             (BASE PROJECT ALLOCATION - $21,400,000)
    15         (11)  SR 21, HIGHWAY RECONSTRUCTION             3,000,000
    16             (BASE PROJECT ALLOCATION - $3,000,000)
    17  SECTION 331.  HUNTINGDON COUNTY.
    18     PROJECTS ARE AS FOLLOWS:
    19         (1)  SR 26, TWO-LANE RELOCATION BYPASS, SR
    20             26 FROM PA 305 TO NEAR SAWMILL ROAD, T-
    21             528, JACKSON TOWNSHIP                       2,285,000
    22             (BASE PROJECT ALLOCATION - $1,700,000)
    23             (LAND ALLOCATION - $94,000)
    24             (DESIGN AND CONTINGENCIES - $491,000)
    25         (2)  PA 26, SLIDE AND SINK HOLE REPAIR
    26             UNDER ROADWAY, REPLACE EMBANKMENT AND
    27             ROADWAY STRUCTURE                             865,000
    28             (BASE PROJECT ALLOCATION - $865,000)
    29         (3)  SR 3001, RESTORATION, WIDEN AND
    30             OVERLAY                                     6,210,000
    20080S1504B2377                 - 70 -     

     1             (BASE PROJECT ALLOCATION - $5,200,000)
     2             (LAND ALLOCATION - $600,000)
     3             (DESIGN AND CONTINGENCIES - $410,000)
     4         (4)  SR 453, RESTORATION, REHABILITATION
     5             AND TRUCK CLIMBING LANE                     8,003,000
     6             (BASE PROJECT ALLOCATION - $8,003,000)
     7         (5)  SR 655, RECONSTRUCTION, UTILITY
     8             RELOCATION AND DRAINAGE IMPROVEMENT           600,000
     9             (BASE PROJECT ALLOCATION - $600,000)
    10  SECTION 332.  INDIANA COUNTY.
    11     PROJECTS ARE AS FOLLOWS:
    12         (1)  SR 119, SIGN STRUCTURE, BRIDGE
    13             EXPANSION, DAM REPLACEMENT, WHITE
    14             TOWNSHIP                                        6,000
    15             (BASE PROJECT ALLOCATION - $5,000)
    16             (DESIGN AND CONTINGENCIES - $1,000)
    17         (2)  SR 217, INTERSECTION AND SAFETY
    18             IMPROVEMENTS, PA 217 AND SR 3009,
    19             NEWPORT ROAD INTERSECTION, BURRELL
    20             TOWNSHIP                                       72,000
    21             (BASE PROJECT ALLOCATION - $60,000)
    22             (LAND ALLOCATION - $12,000)
    23         (3)  SR 22, HIGHWAY RESTORATION AND
    24             RESURFACING, ARMAGH BYPASS EAST, SR 22
    25             FROM PA 56 TO PA 403, EAST WHEATFIELD
    26             TOWNSHIP                                      640,000
    27             (BASE PROJECT ALLOCATION - $600,000)
    28             (DESIGN AND CONTINGENCIES - $40,000)
    29         (4)  SR 22, HIGHWAY RESTORATION AND
    30             RESURFACING, ARMAGH BYPASS WEST, T-893,
    20080S1504B2377                 - 71 -     

     1             MCCLAIN HILL ROAD, TO PA 56
     2             INTERCHANGE, EAST WHEATFIELD TOWNSHIP         640,000
     3             (BASE PROJECT ALLOCATION - $600,000)
     4             (DESIGN AND CONTINGENCIES - $40,000)
     5         (5)  SR 3011, REESTABLISH RAILROAD
     6             CROSSING, BLACKLICK RAILROAD CROSSING,
     7             NEAR INTERSECTION OF SR 3011 AND US
     8             119, BURRELL TOWNSHIP                         120,000
     9             (BASE PROJECT ALLOCATION - $120,000)
    10         (6)  SR 422, PREVENTIVE MAINTENANCE,
    11             RESURFACE, US 422 FROM US 119 EAST TO
    12             PA 954, CHERRYHILL AND WHITE TOWNSHIPS        168,000
    13             (BASE PROJECT ALLOCATION - $168,000)
    14         (7)  SR 3013, CORRIDOR SAFETY IMPROVEMENT,
    15             INTERSECTION RECONSTRUCTION                    94,000
    16             (BASE PROJECT ALLOCATION - $94,000)
    17         (8)  SR 119, PAVEMENT RECONSTRUCTION AND
    18             REHABILITATION                              1,200,000
    19             (BASE PROJECT ALLOCATION - $1,200,000)
    20         (9)  SR 422, PAVEMENT RECONSTRUCTION AND
    21             REHABILITATION                                840,000
    22             (BASE PROJECT ALLOCATION - $840,000)
    23         (10)  SR 422, PAVEMENT RECONSTRUCTION AND
    24             REHABILITATION                              1,000,000
    25             (BASE PROJECT ALLOCATION - $1,000,000)
    26         (11)  SR 422, PAVEMENT RECONSTRUCTION AND
    27             REHABILITATION                                480,000
    28             (BASE PROJECT ALLOCATION - $480,000)
    29  SECTION 333.  JEFFERSON COUNTY.
    30     PROJECTS ARE AS FOLLOWS:
    20080S1504B2377                 - 72 -     

     1         (1)  SR 28, HIGHWAY RESTORATION, SR 28 FROM
     2             SR 28/36/322 INTERSECTION TO 1.5 MILES
     3             SOUTH OF INTERSECTION, BROOKVILLE
     4             BOROUGH AND ROSE TOWNSHIP                     510,000
     5             (BASE PROJECT ALLOCATION - $450,000)
     6             (LAND ALLOCATION - $40,000)
     7             (DESIGN AND CONTINGENCIES - $20,000)
     8         (2)  SR 80, INTERSTATE RESTORATION,
     9             REHABILITATION, I-80, SEGMENT 775 TO
    10             SEGMENT 841 AND SEGMENT 774 TO SEGMENT
    11             840, BROOKVILLE BOROUGH, PINE CREEK AND
    12             ROSE TOWNSHIPS                              2,770,000
    13             (BASE PROJECT ALLOCATION - $2,700,000)
    14             (DESIGN AND CONTINGENCIES - $70,000)
    15         (3)  SR 80, INTERSTATE RESTORATION,
    16             REHABILITATION, WEST I-80, SEGMENT 841
    17             TO SEGMENT 881 AND SEGMENT 840 TO
    18             SEGMENT 880, ROSE AND UNION TOWNSHIPS         320,000
    19             (BASE PROJECT ALLOCATION - $300,000)
    20             (DESIGN AND CONTINGENCIES - $20,000)
    21         (4)  I-80, INTERSTATE RESTORATION AND
    22             RECONSTRUCTION                             23,600,000
    23             (BASE PROJECT ALLOCATION - $23,600,000)
    24         (5)  SR 219, PAVEMENT RECONSTRUCTION AND
    25             REHABILITATION                                140,000
    26             (BASE PROJECT ALLOCATION - $140,000)
    27         (6)  US 119, FLATTEN THE EXISTING SHARP
    28             HORIZONTAL CURVE, ADD LEFT-TURN STANDBY
    29             LANES AND IMPROVE INTERSECTION SIGHT
    30             DISTANCE                                      458,000
    20080S1504B2377                 - 73 -     

     1             (BASE PROJECT ALLOCATION - $146,000)
     2             (DESIGN AND CONTINGENCIES - $312,000)
     3         (7)  VARIOUS, SAFETY, CONGESTION RELIEF,
     4             ADD TURNING LANE, EXISTING SIGNAL
     5             IMPROVEMENT                                   325,000
     6             (LAND ALLOCATION - $325,000)
     7  SECTION 334.  JUNIATA COUNTY.
     8     PROJECTS ARE AS FOLLOWS:
     9         (1)  SR 1007, RECONSTRUCTION, SR 1007 FROM
    10             IRVING STREET TO UNION BOULEVARD AND
    11             AIRPORT ROAD TO LLOYD STREET, TUSCARORA
    12             TOWNSHIP                                      110,000
    13             (BASE PROJECT ALLOCATION - $75,000)
    14             (LAND ALLOCATION - $10,000)
    15             (DESIGN AND CONTINGENCIES - $25,000)
    16         (2)  SR 3002, CENTER TURN LANE, SAFETY
    17             IMPROVEMENT, INTERSECTION OF SR 3002
    18             AND SR 3005, FERMANAGH AND WALKER
    19             TOWNSHIPS                                     180,000
    20             (BASE PROJECT ALLOCATION - $120,000)
    21             (LAND ALLOCATION - $10,000)
    22             (DESIGN AND CONTINGENCIES - $50,000)
    23         (3)  SR 35, SR 4005, REMOVAL OF A HOUSE AT
    24             THE INTERSECTION, SAFETY IMPROVEMENT,
    25             SR 35 AND BLACK LOG ROAD, SR 4005,
    26             TUSCARORA TOWNSHIP                             22,000
    27             (BASE PROJECT ALLOCATION - $5,000)
    28             (LAND ALLOCATION - $15,000)
    29             (DESIGN AND CONTINGENCIES - $2,000)
    30  SECTION 335.  LACKAWANNA COUNTY.
    20080S1504B2377                 - 74 -     

     1     PROJECTS ARE AS FOLLOWS:
     2         (1)  SR 1012, INTERSECTION IMPROVEMENT,
     3             KENNEDY DRIVE AND COUNTY ROAD
     4             INTERSECTION, ARCHBALD BOROUGH                120,000
     5             (BASE PROJECT ALLOCATION - $120,000)
     6         (2)  SR 81, RESTORATION, I-81 NORTHBOUND
     7             AND SOUTHBOUND CONCRETE GRINDING,
     8             DUNMORE BOROUGH, CITY OF SCRANTON             270,000
     9             (BASE PROJECT ALLOCATION - $190,000)
    10             (DESIGN AND CONTINGENCIES - $80,000)
    11         (3)  SR 81, SR 84, ITS IMPROVEMENTS AND
    12             PURCHASES, I-81 CORRIDOR, I-84
    13             CORRIDOR, I-380 CORRIDOR, US 6
    14             CORRIDOR, VARIOUS MUNICIPALITIES              700,000
    15             (BASE PROJECT ALLOCATION - $600,000)
    16             (DESIGN AND CONTINGENCIES - $100,000)
    17         (4)  I-380, INTERSTATE RESTORATION AND
    18             RECONSTRUCTION                             10,400,000
    19             (BASE PROJECT ALLOCATION - $10,400,000)
    20         (5)  I-81, INTERSTATE RESTORATION AND
    21             RECONSTRUCTION                             26,400,000
    22             (BASE PROJECT ALLOCATION - $26,400,000)
    23         (6)  I-84, INTERSTATE RESTORATION AND
    24             RECONSTRUCTION                             12,100,000
    25             (BASE PROJECT ALLOCATION - $12,100,000)
    26         (7)  SR 435, SAFETY AND INTERSECTION
    27             IMPROVEMENTS                                  271,000
    28             (BASE PROJECT ALLOCATION - $271,000)
    29         (8)  SR 11, NEW TRAFFIC SIGNAL                     86,000
    30             (LAND ALLOCATION - $65,000)
    20080S1504B2377                 - 75 -     

     1             (DESIGN AND CONTINGENCIES - $21,000)
     2         (9)  SR 502, ROADWAY AND SLOPE REPAIRS            400,000
     3             (BASE PROJECT ALLOCATION - $336,000)
     4             (LAND ALLOCATION - $44,000)
     5             (DESIGN AND CONTINGENCIES - $20,000)
     6         (10)  SR 84, PIPE REPLACEMENT                     107,000
     7             (BASE PROJECT ALLOCATION - $100,000)
     8             (LAND ALLOCATION - $7,000)
     9  SECTION 336.  LANCASTER COUNTY.
    10     PROJECTS ARE AS FOLLOWS:
    11         (1)  SR 222, PAVE SHOULDERS, BASE REPAIR,
    12             PAVEMENT RECONSTRUCTION,
    13             REHABILITATION, US 222 FROM NORTH OF US
    14             322 TO COUNTY LINE, BRECKNOCK, EAST
    15             COCALICO AND EPHRATA TOWNSHIPS              2,395,000
    16             (BASE PROJECT ALLOCATION - $2,280,000)
    17             (LAND ALLOCATION - $50,000)
    18             (DESIGN AND CONTINGENCIES - $65,000)
    19         (2)  SR 222, STRUCTURAL OVERLAY, RESURFACE,
    20             SHOULDER IMPROVEMENT, US 222 FROM NORTH
    21             OF BUSHONG ROAD TO US 322, EPHRATA,
    22             MANHEIM, WARWICK AND WEST EARL
    23             TOWNSHIPS                                   3,515,000
    24             (BASE PROJECT ALLOCATION - $3,400,000)
    25             (LAND ALLOCATION - $50,000)
    26             (DESIGN AND CONTINGENCIES - $65,000)
    27         (3)  SR 222, SHOULDERS, INTERSECTION, BASE
    28             REPAIR, DRAINAGE, STRUCTURE OVERLAY,
    29             BEAVER VALLEY PIKE, US 222 FROM
    30             QUARRYVILLE TO WILLOW STREET,
    20080S1504B2377                 - 76 -     

     1             QUARRYVILLE BOROUGH, PROVIDENCE,
     2             STRASBURG AND WEST LAMPETER TOWNSHIPS       1,640,000
     3             (BASE PROJECT ALLOCATION - $1,500,000)
     4             (LAND ALLOCATION - $100,000)
     5             (DESIGN AND CONTINGENCIES - $40,000)
     6         (4)  SR 30, CONCRETE PAVEMENT
     7             RECONSTRUCTION, REHABILITATION, US 30
     8             FROM PA 283 TO EAST OF US 222, EAST
     9             LAMPETER AND MANHEIM TOWNSHIPS, CITY OF
    10             LANCASTER                                   4,048,000
    11             (BASE PROJECT ALLOCATION - $3,978,000)
    12             (LAND ALLOCATION - $20,000)
    13             (DESIGN AND CONTINGENCIES - $50,000)
    14         (5)  SR 30, ADD TURNING LANE, CORRIDOR
    15             SAFETY, SINGLE AND INTERSECTION
    16             IMPROVEMENTS, LINCOLN HIGHWAY CORRIDOR
    17             FROM PA 41 TO PA 772, SALISBURY
    18             TOWNSHIP                                    1,170,000
    19             (BASE PROJECT ALLOCATION - $750,000)
    20             (LAND ALLOCATION - $200,000)
    21             (DESIGN AND CONTINGENCIES - $220,000)
    22         (6)  SR 23, TRANSPORTATION STUDY                  578,000
    23             (LAND ALLOCATION - $578,000)
    24  SECTION 337.  LAWRENCE COUNTY.
    25     PROJECTS ARE AS FOLLOWS:
    26         (1)  SR 1012, CONCRETE REHABILITATION,
    27             RECONSTRUCT AND BITUMINOUS OVERLAY,
    28             FREW MILL ROAD FROM BRIDGE OVER BIG RUN
    29             TO YOUNG ROAD, SHENANGO AND SLIPPERY
    30             ROCK TOWNSHIPS                              2,700,000
    20080S1504B2377                 - 77 -     

     1             (BASE PROJECT ALLOCATION - $2,700,000)
     2         (2)  SR 108, CONCRETE PAVEMENT
     3             RECONSTRUCTION, REHABILITATION,
     4             HARLANSBURG ROAD FROM SR 388 TO BROWN
     5             ROAD, HICKORY AND SCOTT TOWNSHIPS           1,391,000
     6             (BASE PROJECT ALLOCATION - $1,264,000)
     7             (DESIGN AND CONTINGENCIES - $127,000)
     8         (3)  SR 108, CONCRETE REHABILITATION,
     9             RECONSTRUCT AND BITUMINOUS OVERLAY,
    10             HARLANSBURG ROAD FROM CASCADE STREET TO
    11             SR 388, HICKORY TOWNSHIP, CITY OF NEW
    12             CASTLE                                        923,000
    13             (BASE PROJECT ALLOCATION - $923,000)
    14         (4)  SR 168, CONCRETE REHABILITATION,
    15             RECONSTRUCT AND BITUMINOUS OVERLAY,
    16             EASTBROOK ROAD FROM SR 18 TO INDUSTRIAL
    17             BOULEVARD, NORTH BEAVER AND TAYLOR
    18             TOWNSHIPS                                   3,000,000
    19             (BASE PROJECT ALLOCATION - $3,000,000)
    20         (5)  SR 168, CONCRETE REHABILITATION,
    21             RECONSTRUCT AND BITUMINOUS OVERLAY,
    22             THIRD STREET FROM INDUSTRIAL BOULEVARD
    23             TO CHERRY STREET, TAYLOR TOWNSHIP           2,001,000
    24             (BASE PROJECT ALLOCATION - $2,001,000)
    25         (6)  SR 18, UPGRADE AND COORDINATE 9
    26             SIGNALS, SAFETY IMPROVEMENT, SR 18 IN
    27             NEW CASTLE BUSINESS DISTRICT FROM GRANT
    28             AVENUE TO MAHONING AVENUE AND MORAVIA
    29             STREET, CITY OF NEW CASTLE                     25,000
    30             (DESIGN AND CONTINGENCIES - $25,000)
    20080S1504B2377                 - 78 -     

     1         (7)  SR 19, RESURFACING RESTORATION, PERRY
     2             HIGHWAY FROM SR 108 TO SR 1015, SCOTT
     3             AND WASHINGTON TOWNSHIPS                    2,700,000
     4             (BASE PROJECT ALLOCATION - $2,700,000)
     5         (8)  SR 19, CONCRETE PAVEMENT
     6             RECONSTRUCTION, REHABILITATION, PERRY
     7             HIGHWAY FROM SR 1018 TO MERCER COUNTY
     8             LINE, WASHINGTON TOWNSHIP                   1,173,000
     9             (BASE PROJECT ALLOCATION - $1,066,000)
    10             (DESIGN AND CONTINGENCIES - $107,000)
    11         (9)  SR 2032, CONCRETE PAVEMENT
    12             RECONSTRUCTION, REHABILITATION, CHERRY
    13             STREET FROM SR 18 TO SR 168, CITY OF
    14             NEW CASTLE                                  1,100,000
    15             (BASE PROJECT ALLOCATION - $1,000,000)
    16             (DESIGN AND CONTINGENCIES - $100,000)
    17         (10)  SR 351, SAFETY IMPROVEMENT, SR 351
    18             FROM ELLWOOD CITY, 5TH STREET TO 9TH
    19             STREET, ELLWOOD CITY BOROUGH                  233,000
    20             (BASE PROJECT ALLOCATION - $220,000)
    21             (DESIGN AND CONTINGENCIES - $13,000)
    22         (11)  SR 4002, CONCRETE PAVEMENT
    23             RECONSTRUCTION, REHABILITATION, SAMPSON
    24             STREET FROM INTERSECTION SR 422 AND SR
    25             60 TO BEGINNING OF ASPHALT OVERLAY,
    26             UNION TOWNSHIP                                330,000
    27             (BASE PROJECT ALLOCATION - $300,000)
    28             (DESIGN AND CONTINGENCIES - $30,000)
    29         (12)  SR 4005, CONCRETE REHABILITATION,
    30             RECONSTRUCT AND BITUMINOUS OVERLAY,
    20080S1504B2377                 - 79 -     

     1             RIVER ROAD FROM CHAPIN ROAD TO NASHUA
     2             ROAD, NESHANNOCK AND PULASKI TOWNSHIPS        650,000
     3             (BASE PROJECT ALLOCATION - $650,000)
     4         (13)  SR 422, CONCRETE PAVEMENT
     5             RECONSTRUCTION, REHABILITATION, BEN
     6             FRANKLIN HIGHWAY FROM PINE GLEN ROAD TO
     7             ZOCCOLI ROAD, MAHONING AND PULASKI
     8             TOWNSHIPS                                   4,357,000
     9             (BASE PROJECT ALLOCATION - $3,961,000)
    10             (DESIGN AND CONTINGENCIES - $396,000)
    11         (14)  SR 422, CONCRETE REHABILITATION,
    12             RECONSTRUCT AND BITUMINOUS OVERLAY, BEN
    13             FRANKLIN HIGHWAY FROM ZOCCOLI ROAD TO
    14             MATHEWS ROAD, MAHONING AND UNION
    15             TOWNSHIPS                                   1,700,000
    16             (BASE PROJECT ALLOCATION - $1,700,000)
    17         (15)  SR 422, REALIGNMENT AND ROADWAY
    18             RECONSTRUCTION, FREEDOM ROAD UPGRADE,
    19             PHASE A, NEW SEWICKLEY TOWNSHIP                16,000
    20             (BASE PROJECT ALLOCATION - $15,000)
    21             (DESIGN AND CONTINGENCIES - $1,000)
    22         (16)  SR 422, CONCRETE PAVEMENT
    23             RECONSTRUCTION, REHABILITATION, BEN
    24             FRANKLIN HIGHWAY FROM SHENANGO TOWNSHIP
    25             LINE TO COPPER ROAD, SHENANGO, SLIPPERY
    26             ROCK AND UNION TOWNSHIPS                    3,300,000
    27             (BASE PROJECT ALLOCATION - $3,300,000)
    28         (17)  SR 422, CONCRETE PAVEMENT
    29             RECONSTRUCTION, REHABILITATION, BEN
    30             FRANKLIN HIGHWAY FROM STONER DRIVE TO
    20080S1504B2377                 - 80 -     

     1             BRIDGE OVER SLIPPERY ROCK, SLIPPERY
     2             ROCK TOWNSHIP                               1,980,000
     3             (BASE PROJECT ALLOCATION - $1,800,000)
     4             (DESIGN AND CONTINGENCIES - $180,000)
     5         (18)  SR 422, CONCRETE PAVEMENT
     6             RECONSTRUCTION, REHABILITATION, BEN
     7             FRANKLIN HIGHWAY, NORTHBOUND FROM
     8             BRIDGE OVER SLIPPERY ROCK BRIDGE TO
     9             BUTLER CITY LINE, SLIPPERY ROCK
    10             TOWNSHIP                                    1,100,000
    11             (BASE PROJECT ALLOCATION - $1,000,000)
    12             (DESIGN AND CONTINGENCIES - $100,000)
    13         (19)  SR 422, CONCRETE PAVEMENT
    14             RECONSTRUCTION, REHABILITATION, BEN
    15             FRANKLIN HIGHWAY, SOUTHBOUND FROM
    16             BRIDGE OVER SLIPPERY ROCK BRIDGE TO
    17             BUTLER CITY LINE, SLIPPERY ROCK
    18             TOWNSHIP                                    1,100,000
    19             (BASE PROJECT ALLOCATION - $1,000,000)
    20             (DESIGN AND CONTINGENCIES - $100,000)
    21         (20)  SR 422, CONCRETE PAVEMENT
    22             RECONSTRUCTION, REHABILITATION, BEN
    23             FRANKLIN HIGHWAY FROM COPPER ROAD TO
    24             STONER DRIVE, SLIPPERY ROCK TOWNSHIP        4,071,000
    25             (BASE PROJECT ALLOCATION - $3,701,000)
    26             (DESIGN AND CONTINGENCIES - $370,000)
    27         (21)  SR 422, CONCRETE REHABILITATION,
    28             RECONSTRUCTION, SR 422 FROM SR 60 TO
    29             TURNPIKE, UNION TOWNSHIP                    1,202,000
    30             (BASE PROJECT ALLOCATION - $1,095,000)
    20080S1504B2377                 - 81 -     

     1             (DESIGN AND CONTINGENCIES - $107,000)
     2         (22)  SR 422, SR 2004, CONCRETE PAVEMENT
     3             RECONSTRUCTION, REHABILITATION,
     4             BUSINESS ROUTE 422 AND SR 422 FROM
     5             CASCADE STREET TO BUTLER COUNTY LINE,
     6             SHENANGO, SLIPPERY ROCK AND UNION
     7             TOWNSHIPS, CITY OF NEW CASTLE               3,965,000
     8             (BASE PROJECT ALLOCATION - $3,965,000)
     9         (23)  SR 60, INTERSTATE MAINTENANCE,
    10             CONCRETE REHABILITATION,
    11             RECONSTRUCTION, SR 60 FROM MERCER
    12             COUNTY LINE TO MITCHELL ROAD,
    13             NESHANNOCK, PULASKI AND WILMINGTON
    14             TOWNSHIPS                                   1,626,000
    15             (BASE PROJECT ALLOCATION - $1,470,000)
    16             (DESIGN AND CONTINGENCIES - $156,000)
    17         (24)  SR 60, INTERSTATE MAINTENANCE,
    18             CONCRETE REHABILITATION,
    19             RECONSTRUCTION, SR 60 FROM MITCHELL
    20             ROAD TO SR 422, NESHANNOCK AND UNION
    21             TOWNSHIPS                                   1,750,000
    22             (BASE PROJECT ALLOCATION - $1,656,000)
    23             (DESIGN AND CONTINGENCIES - $94,000)
    24         (25)  SR 79, INTERSTATE MAINTENANCE,
    25             RESTORATION AND REHABILITATION I-79
    26             CORRIDOR, PLAIN GROVE TOWNSHIP              1,575,000
    27             (BASE PROJECT ALLOCATION - $1,500,000)
    28             (DESIGN AND CONTINGENCIES - $75,000)
    29         (26)  I-79, INTERSTATE RESTORATION AND
    30             RECONSTRUCTION                              5,100,000
    20080S1504B2377                 - 82 -     

     1             (BASE PROJECT ALLOCATION - $5,100,000)
     2         (27)  VARIOUS, SLIDES CORRECTION, RETAINING
     3             WALLS                                          60,000
     4             (LAND ALLOCATION - $60,000)
     5         (28)  VARIOUS, EXISTING SIGNAL IMPROVEMENT         20,000
     6             (LAND ALLOCATION - $20,000)
     7  SECTION 338.  LEBANON COUNTY.
     8     PROJECTS ARE AS FOLLOWS:
     9         (1)  SR 422, CONGESTED CORRIDOR IMPROVEMENT
    10             PROGRAM, ADD TURNING LANE, SIGNAL
    11             IMPROVEMENT, PEDESTRIAN FACILITIES, SR
    12             422 CORRIDOR, PALMYRA BOROUGH TO CLEONA
    13             BOROUGH, VARIOUS MUNICIPALITIES               620,000
    14             (BASE PROJECT ALLOCATION - $500,000)
    15             (LAND ALLOCATION - $20,000)
    16             (DESIGN AND CONTINGENCIES - $100,000)
    17         (2)  I-78, INTERSTATE RESTORATION AND
    18             RECONSTRUCTION                              8,000,000
    19             (BASE PROJECT ALLOCATION - $8,000,000)
    20         (3)  I-81, INTERSTATE RESTORATION AND
    21             RECONSTRUCTION                             15,100,000
    22             (BASE PROJECT ALLOCATION - $15,100,000)
    23         (4)  SR 443, BASE AND PAVEMENT RESTORATION
    24             AND REHABILITATION, PREVENTIVE
    25             MAINTENANCE ON SUBSTRUCTURE OF THREE
    26             BRIDGES                                     3,025,000
    27             (BASE PROJECT ALLOCATION - $2,720,000)
    28             (LAND ALLOCATION - $275,000)
    29             (DESIGN AND CONTINGENCIES - $30,000)
    30  SECTION 339.  LEHIGH COUNTY.
    20080S1504B2377                 - 83 -     

     1     PROJECTS ARE AS FOLLOWS:
     2         (1)  SR 1004, FOOT DRAINAGE STUDY, LEHIGH
     3             AVENUE RETAINING WALL, WHITEHALL
     4             TOWNSHIP                                      450,000
     5             (BASE PROJECT ALLOCATION - $100,000)
     6             (LAND ALLOCATION - $100,000)
     7             (DESIGN AND CONTINGENCIES - $250,000)
     8         (2)  SR 145, EXCAVATE ROCK, SHOULDER,
     9             CORRECT DRAINAGE, SAFETY IMPROVEMENT,
    10             SR 145, SEGMENT 260 AND SEGMENT 270,
    11             NORTH WHITEHALL TOWNSHIP                      400,000
    12             (BASE PROJECT ALLOCATION - $100,000)
    13             (LAND ALLOCATION - $50,000)
    14             (DESIGN AND CONTINGENCIES - $250,000)
    15         (3)  SR 222, SIGNALIZATION, SAFETY
    16             IMPROVEMENT, SR 222 AND SHANTZ ROAD
    17             INTERSECTION, UPPER MACUNGIE TOWNSHIP         340,000
    18             (BASE PROJECT ALLOCATION - $100,000)
    19             (LAND ALLOCATION - $40,000)
    20             (DESIGN AND CONTINGENCIES - $200,000)
    21         (4)  SR 29, CONGESTED CORRIDOR IMPROVEMENT
    22             PROGRAM, CORRIDOR SAFETY IMPROVEMENT,
    23             CEDAR CREST BOULEVARD CORRIDOR FROM I-
    24             78 TO CHESTNUT STREET, VARIOUS
    25             MUNICIPALITIES                                475,000
    26             (BASE PROJECT ALLOCATION - $300,000)
    27             (LAND ALLOCATION - $75,000)
    28             (DESIGN AND CONTINGENCIES - $100,000)
    29         (5)  SR 4003, REPLACE HEADWALLS, CONCRETE
    30             GUTTER REGRADING AND SET BACK, SAFETY
    20080S1504B2377                 - 84 -     

     1             IMPROVEMENT, KERNSVILLE ROAD AT JORDAN
     2             ROAD, NORTH WHITEHALL TOWNSHIP                310,000
     3             (BASE PROJECT ALLOCATION - $100,000)
     4             (LAND ALLOCATION - $40,000)
     5             (DESIGN AND CONTINGENCIES - $170,000)
     6         (6)  SR 78, PROVIDE ROAMING SERVICE PATROL,
     7             SAFETY IMPROVEMENT, SR 78 FROM SR 100
     8             TO SR 309/145 AND ALONG SR 22 FROM I-78
     9             TO SR 33, VARIOUS MUNICIPALITIES              180,000
    10             (BASE PROJECT ALLOCATION - $180,000)
    11         (7)  SR 22, INSTALL DYNAMIC MESSAGE SIGNS,
    12             I-78 AND SR 22 CORRIDORS, VARIOUS
    13             MUNICIPALITIES                                390,000
    14             (BASE PROJECT ALLOCATION - $95,000)
    15             (LAND ALLOCATION - $15,000)
    16             (DESIGN AND CONTINGENCIES - $280,000)
    17         (8)  SR 22, INSTALLATION OF HIGHWAY
    18             ADVISORY RADIO BEACONS, I-78 AND SR 22
    19             CORRIDORS, VARIOUS MUNICIPALITIES             300,000
    20             (BASE PROJECT ALLOCATION - $100,000)
    21             (LAND ALLOCATION - $15,000)
    22             (DESIGN AND CONTINGENCIES - $185,000)
    23         (9)  SR 22, REPLACE 27 EXISTING QUEUE
    24             DETECTORS WITH PASSIVE ACOUSTIC
    25             SENSORS, SR 22, I-78 AND SR 33
    26             CORRIDORS, VARIOUS MUNICIPALITIES             617,000
    27             (BASE PROJECT ALLOCATION - $100,000)
    28             (DESIGN AND CONTINGENCIES - $517,000)
    29         (10)  SR 78, REPLACEMENT OF PRECAST
    30             PARAPETS, VARIOUS LOCATIONS ON SR 78,
    20080S1504B2377                 - 85 -     

     1             SR 22, SR 863, SR 873 AND SR 3007,
     2             VARIOUS MUNICIPALITIES                      2,690,000
     3             (BASE PROJECT ALLOCATION - $150,000)
     4             (LAND ALLOCATION - $40,000)
     5             (DESIGN AND CONTINGENCIES - $2,500,000)
     6         (11)  SR 78, INSTALL MEDIAN GUIDE RAIL,
     7             SAFETY IMPROVEMENT, I-78 VARIOUS
     8             LOCATIONS, VARIOUS MUNICIPALITIES             725,000
     9             (BASE PROJECT ALLOCATION - $100,000)
    10             (DESIGN AND CONTINGENCIES - $625,000)
    11         (12)  SR 78, INSTALL CLOSED CIRCUIT
    12             TELEVISION CAMERAS, I-78 AND SR 33
    13             CORRIDORS, VARIOUS MUNICIPALITIES             265,000
    14             (BASE PROJECT ALLOCATION - $125,000)
    15             (LAND ALLOCATION - $15,000)
    16             (DESIGN AND CONTINGENCIES - $125,000)
    17         (13)  I-78, INTERSTATE RESTORATION AND
    18             RECONSTRUCTION                             19,220,000
    19             (BASE PROJECT ALLOCATION - $19,220,000)
    20         (14)  SR 309, WIDEN TO INCORPORATE LEFT
    21             TURN LANES AT SIGNALIZED INTERSECTIONS,
    22             MEDIAN BARRIER, CROSSWALKS AND SIDEWALK
    23             IMPROVEMENTS                                  336,000
    24             (BASE PROJECT ALLOCATION - $336,000)
    25  SECTION 340.  LUZERNE COUNTY.
    26     PROJECTS ARE AS FOLLOWS:
    27         (1)  SR 11, INTERSECTION IMPROVEMENT, SR 11
    28             AND SR 29 INTERSECTION, PLYMOUTH
    29             TOWNSHIP                                       29,000
    30             (BASE PROJECT ALLOCATION - $10,000)
    20080S1504B2377                 - 86 -     

     1             (LAND ALLOCATION - $4,000)
     2             (DESIGN AND CONTINGENCIES - $15,000)
     3         (2)  SR 115, INSTALL ROCK FENCE, SAFETY
     4             IMPROVEMENT, PA 115 FROM TRUCK ESCAPE
     5             RAMP TO EAST MOUNTAIN BOULEVARD, PLAINS
     6             TOWNSHIP                                      675,000
     7             (BASE PROJECT ALLOCATION - $600,000)
     8             (LAND ALLOCATION - $50,000)
     9             (DESIGN AND CONTINGENCIES - $25,000)
    10         (3)  SR 2029, REMOVE EXISTING ABANDONED
    11             RAILROAD BRIDGE ABUTMENTS, SAFETY
    12             IMPROVEMENT, ABUTMENT REMOVAL, YORK
    13             AVENUE AND WOOD STREET, DURYEA BOROUGH         26,000
    14             (BASE PROJECT ALLOCATION - $18,000)
    15             (LAND ALLOCATION - $8,000)
    16         (4)  SR 2032, REMOVE EXISTING ABANDONED
    17             RAILROAD BRIDGE ABUTMENTS, SAFETY
    18             IMPROVEMENT, NEAR THE INTERSECTION OF
    19             SR 2030 AND SR 2032, DURYEA AND
    20             HUGHESTOWN BOROUGHS                            19,000
    21             (BASE PROJECT ALLOCATION - $19,000)
    22         (5)  SR 309, INSTALL ROCK FENCE, SAFETY
    23             IMPROVEMENT, PA 309, BROWN STREET, T-
    24             433, TO PINE RUN ROAD, SR 2034,
    25             FAIRVIEW AND HANOVER TOWNSHIPS                640,000
    26             (BASE PROJECT ALLOCATION - $640,000)
    27         (6)  SR 80, SR 81, SR 309, ITS IMPROVEMENTS
    28             AND PURCHASES, I-80 CORRIDOR, I-81
    29             CORRIDOR AND PA 309 CORRIDOR, VARIOUS
    30             MUNICIPALITIES                                700,000
    20080S1504B2377                 - 87 -     

     1             (BASE PROJECT ALLOCATION - $600,000)
     2             (DESIGN AND CONTINGENCIES - $100,000)
     3         (7)  SOUTH VALLEY PARKWAY CONNECTING PA
     4             ROUTE 29 TO KIRMAR PARKWAY, NANTICOKE,
     5             HANOVER AND NEWPORT TOWNSHIPS              65,000,000
     6             (BASE PROJECT ALLOCATION - $65,000,000)
     7         (8)  I-80, INTERSTATE RESTORATION AND
     8             RECONSTRUCTION                             25,300,000
     9             (BASE PROJECT ALLOCATION - $25,300,000)
    10         (9)  I-81, INTERSTATE RESTORATION AND
    11             RECONSTRUCTION                             39,100,000
    12             (BASE PROJECT ALLOCATION - $39,100,000)
    13         (10)  NEW ROAD, NEW ACCESS ROAD                 3,570,000
    14             (BASE PROJECT ALLOCATION - $3,570,000)
    15         (11)  SR 3046, SOUTH VALLEY PARKWAY, NEW
    16             TWO-LANE ROADWAY, NEW INTERCHANGE WITH
    17             ROUTE 29, BRIDGE REPLACEMENT, SR 2008,
    18             MIDDLE ROAD OVER ROUTE 29 AND BRIDGE        1,755,000
    19             (LAND ALLOCATION - $1,404,000)
    20             (DESIGN AND CONTINGENCIES - $351,000)
    21         (12)  SR 115, INTERCHANGE SAFETY
    22             IMPROVEMENT                                 2,662,000
    23             (BASE PROJECT ALLOCATION - $1,622,000)
    24             (LAND ALLOCATION - $1,040,000)
    25         (13)  SR 239, RESTORATION                          87,000
    26             (LAND ALLOCATION - $87,000)
    27         (14)  SR 6039, CORRIDOR SAFETY IMPROVEMENT,
    28             SIGNALS AND WIDENING                          267,000
    29             (BASE PROJECT ALLOCATION - $267,000)
    30         (15)  SR 924, RESTORATION AND WIDENING TWO
    20080S1504B2377                 - 88 -     

     1             LANES TO FIVE LANES                         3,031,000
     2             (BASE PROJECT ALLOCATION - $3,031,000)
     3         (16)  SR 924, RESTORATION AND WIDENING          1,831,000
     4             (BASE PROJECT ALLOCATION - $1,831,000)
     5         (17)  SR 93, RESTORATION AND WIDENING           3,516,000
     6             (BASE PROJECT ALLOCATION - $3,516,000)
     7         (18)  SR 2029, ABUTMENT REMOVAL                     8,000
     8             (LAND ALLOCATION - $8,000)
     9         (19)  SR 2032, ABUTMENT REMOVAL                     4,000
    10             (BASE PROJECT ALLOCATION - $4,000)
    11         (20)  SR 309, INSTALL ROCK FENCE                  640,000
    12             (BASE PROJECT ALLOCATION - $640,000)
    13         (21)  SR 309, RESTORATION, ROADWAY AND
    14             RETAINING WALL                                430,000
    15             (BASE PROJECT ALLOCATION - $430,000)
    16  SECTION 341.  LYCOMING COUNTY.
    17     PROJECTS ARE AS FOLLOWS:
    18         (1)  SR 15, SAFETY IMPROVEMENT, CENTER TURN
    19             LANE US 15 FROM SR 54 TO SOUTH
    20             WILLIAMSPORT, ARMSTRONG AND CLINTON
    21             TOWNSHIPS                                      80,000
    22             (BASE PROJECT ALLOCATION - $60,000)
    23             (DESIGN AND CONTINGENCIES - $20,000)
    24         (2)  SR 15, HIGHWAY RECONSTRUCTION, SR 15-
    25             A10 SECTION, NORTHBOUND, SEGMENT 1350
    26             TO SEGMENT 1390, LYCOMING AND OLD
    27             LYCOMING TOWNSHIPS                            680,000
    28             (BASE PROJECT ALLOCATION - $680,000)
    29         (3)  SR 15, RESURFACE, RECONSTRUCT
    30             CONCRETE, SR 15-A10 SECTION,
    20080S1504B2377                 - 89 -     

     1             SOUTHBOUND, SEGMENT 1301 TO SEGMENT
     2             1391, LYCOMING AND OLD LYCOMING
     3             TOWNSHIPS                                  10,000,000
     4             (BASE PROJECT ALLOCATION - $10,000,000)
     5         (4)  SR 15, RESTORATION, RECONSTRUCT
     6             CONCRETE, SR 15-A10 SECTION,
     7             NORTHBOUND, SEGMENT 1300 TO SEGMENT
     8             1350, OLD LYCOMING TOWNSHIP                 5,835,000
     9             (BASE PROJECT ALLOCATION - $5,400,000)
    10             (DESIGN AND CONTINGENCIES - $435,000)
    11         (5)  SR 2014, RECONSTRUCTION, BROAD STREET
    12             FROM LOYALSOCK CREEK TO MONTOUR STREET,
    13             MONTOURSVILLE BOROUGH                         370,000
    14             (BASE PROJECT ALLOCATION - $350,000)
    15             (LAND ALLOCATION - $10,000)
    16             (DESIGN AND CONTINGENCIES - $10,000)
    17         (6)  SR 220, BUILD LOONS, SAFETY
    18             IMPROVEMENT, SR 0220 FROM SEGMENT 0200
    19             TO SEGMENT 0221, WOODWARD TOWNSHIP             50,000
    20             (BASE PROJECT ALLOCATION - $50,000)
    21         (7)  US 15, RECONSTRUCTION, US 15, PA 220
    22             RAMP, CITY OF WILLIAMSPORT                    420,000
    23             (BASE PROJECT ALLOCATION - $400,000)
    24             (LAND ALLOCATION - $10,000)
    25             (DESIGN AND CONTINGENCIES - $10,000)
    26         (8)  I-180, INTERSTATE RESTORATION AND
    27             RECONSTRUCTION                             19,000,000
    28             (BASE PROJECT ALLOCATION - $19,000,000)
    29         (9)  SR 118, INTERSECTION IMPROVEMENT             520,000
    30             (BASE PROJECT ALLOCATION - $520,000)
    20080S1504B2377                 - 90 -     

     1         (10)  SR 15, HIGHWAY RESTORATION                2,270,000
     2             (BASE PROJECT ALLOCATION - $2,000,000)
     3             (LAND ALLOCATION - $270,000)
     4         (11)  SR 15, HIGHWAY RESTORATION                3,670,000
     5             (BASE PROJECT ALLOCATION - $3,400,000)
     6             (LAND ALLOCATION - $270,000)
     7         (12)  SR 15, HIGHWAY RESTORATION                5,835,000
     8             (BASE PROJECT ALLOCATION - $5,400,000)
     9             (LAND ALLOCATION - $435,000)
    10         (13)  SR 2014, RESURFACING AND RESTORATION        660,000
    11             (BASE PROJECT ALLOCATION - $650,000)
    12             (LAND ALLOCATION - $10,000)
    13         (14)  SR 2039, RETAINING WALL AND
    14             RESTORATION                                   640,000
    15             (BASE PROJECT ALLOCATION - $550,000)
    16             (LAND ALLOCATION - $50,000)
    17             (DESIGN AND CONTINGENCIES - $40,000)
    18         (15)  SR 2060, RESURFACING AND RESTORATION         63,000
    19             (BASE PROJECT ALLOCATION - $53,000)
    20             (LAND ALLOCATION - $10,000)
    21         (16)  SR 220, RESURFACING AND RESTORATION         535,000
    22             (BASE PROJECT ALLOCATION - $525,000)
    23             (LAND ALLOCATION - $10,000)
    24         (17)  SR 220, SAFETY IMPROVEMENT, WIDENING
    25             AND CONSTRUCT LOON                            119,000
    26             (BASE PROJECT ALLOCATION - $50,000)
    27             (LAND ALLOCATION - $54,000)
    28             (DESIGN AND CONTINGENCIES - $15,000)
    29         (18)  SR 3027, RESURFACING AND RESTORATION         70,000
    30             (BASE PROJECT ALLOCATION - $60,000)
    20080S1504B2377                 - 91 -     

     1             (LAND ALLOCATION - $10,000)
     2         (19)  SR 3028, RESURFACING AND RESTORATION        367,000
     3             (BASE PROJECT ALLOCATION - $357,000)
     4             (LAND ALLOCATION - $10,000)
     5         (20)  SR 54, RESURFACING AND RESTORATION          100,000
     6             (BASE PROJECT ALLOCATION - $90,000)
     7             (LAND ALLOCATION - $10,000)
     8         (21)  SR 654, RESURFACING AND RESTORATION         980,000
     9             (BASE PROJECT ALLOCATION - $970,000)
    10             (LAND ALLOCATION - $10,000)
    11  SECTION 342.  MCKEAN COUNTY.
    12     PROJECTS ARE AS FOLLOWS:
    13         (1)  SR 446, HIGHWAY LIGHTING FOR SAFETY
    14             IMPROVEMENTS, SR 446 LIGHTING BETWEEN
    15             SR 155 AND SR 1002, ELDRED TOWNSHIP            35,000
    16             (BASE PROJECT ALLOCATION - $3,000)
    17             (LAND ALLOCATION - $17,000)
    18             (DESIGN AND CONTINGENCIES - $15,000)
    19         (2)  SR 770, SIGHT DISTANCE INTERSECTION
    20             IMPROVEMENTS, SAFETY IMPROVEMENTS, SR
    21             770 AND SR 4005 INTERSECTION, BRADFORD
    22             TOWNSHIP                                      145,000
    23             (BASE PROJECT ALLOCATION - $100,000)
    24             (LAND ALLOCATION - $20,000)
    25             (DESIGN AND CONTINGENCIES - $25,000)
    26  SECTION 343.  MERCER COUNTY.
    27     PROJECTS ARE AS FOLLOWS:
    28         (1)  SR 208, TURN LANES, INTERCHANGE
    29             IMPROVEMENTS, SR 208 AT BLACKTOWN ROAD,
    30             SR 2006 AND AT GEORGE JUNIOR ROAD, SR
    20080S1504B2377                 - 92 -     

     1             63, PINE TOWNSHIP                             245,000
     2             (BASE PROJECT ALLOCATION - $200,000)
     3             (LAND ALLOCATION - $15,000)
     4             (DESIGN AND CONTINGENCIES - $30,000)
     5         (2)  SR 18, RELOCATION OF EAST LAKE ROAD
     6             FROM INTERSECTION WITH SR 18,
     7             PYMATUNING TOWNSHIP                         3,450,000
     8             (BASE PROJECT ALLOCATION - $2,500,000)
     9             (LAND ALLOCATION - $150,000)
    10             (DESIGN AND CONTINGENCIES - $800,000)
    11         (3)  RECONSTRUCTION AND SUBSIDENCE
    12             PREVENTION CONSTRUCTION, EAST LAKE
    13             ROAD, FROM PA 18 FOR 0.2 MILES,
    14             PYMATUNING TOWNSHIP                         3,550,000
    15             (BASE PROJECT ALLOCATION - $2,500,000)
    16             (LAND ALLOCATION - $250,000)
    17             (DESIGN AND CONTINGENCIES - $800,000)
    18         (4)  I-80, INTERSTATE RESTORATION AND
    19             RECONSTRUCTION                             27,000,000
    20             (BASE PROJECT ALLOCATION - $27,000,000)
    21         (5)  I-79, INTERSTATE RESTORATION AND
    22             RECONSTRUCTION                             25,500,000
    23             (BASE PROJECT ALLOCATION - $25,500,000)
    24         (6)  SR 60, PHASE 2, RESTORATION,
    25             REHABILITATION AND UPGRADING EXISTING
    26             SIGNALS                                     2,476,000
    27             (BASE PROJECT ALLOCATION - $1,200,000)
    28             (DESIGN AND CONTINGENCIES - $1,276,000)
    29         (7)  SR 60, SAFETY IMPROVEMENT,
    30             RECONSTRUCTION FOR TURNING LANE,
    20080S1504B2377                 - 93 -     

     1             INTERSECTION IMPROVEMENTS, ROADWAY
     2             RESURFACING, UPDATE OF TRAFFIC SIGNALS      2,819,000
     3             (BASE PROJECT ALLOCATION - $1,839,000)
     4             (LAND ALLOCATION - $260,000)
     5             (DESIGN AND CONTINGENCIES - $720,000)
     6  SECTION 344.  MIFFLIN COUNTY (RESERVED).
     7  SECTION 345.  MONROE COUNTY.
     8     PROJECTS ARE AS FOLLOWS:
     9         (1)  SR 33, INSTALLATION OF MEDIAN BARRIER,
    10             SR 33 MEDIAN BARRIER SOUTH SECTION,
    11             SEGMENT 0130 TO SEGMENT 0181, HAMILTON
    12             TOWNSHIP                                      870,000
    13             (BASE PROJECT ALLOCATION - $60,000)
    14             (LAND ALLOCATION - $10,000)
    15             (DESIGN AND CONTINGENCIES - $800,000)
    16         (2)  SR 33, INSTALLATION OF MEDIAN BARRIER,
    17             SAFETY IMPROVEMENT, SR 33 MEDIAN
    18             BARRIER, SOUTH SECTION, SEGMENT 0010 TO
    19             SEGMENT 0100, HAMILTON AND ROSS
    20             TOWNSHIPS                                     550,000
    21             (BASE PROJECT ALLOCATION - $40,000)
    22             (LAND ALLOCATION - $10,000)
    23             (DESIGN AND CONTINGENCIES - $500,000)
    24         (3)  SR 80, REPLACEMENT OF PRECAST
    25             PARAPETS, BRIDGES WITH HOAN-LIKE
    26             DETAILS, GROUP A, I-80, SEGMENT 2931
    27             AND SEGMENT 2935, VARIOUS
    28             MUNICIPALITIES                              1,120,000
    29             (BASE PROJECT ALLOCATION - $100,000)
    30             (DESIGN AND CONTINGENCIES - $1,020,000)
    20080S1504B2377                 - 94 -     

     1         (4)  SR 80, REPLACEMENT OF PRECAST
     2             PARAPETS, BRIDGES WITH HOAN-LIKE
     3             DETAILS, GROUP B, I-80, SEGMENT 2974,
     4             VARIOUS MUNICIPALITIES                      2,543,000
     5             (BASE PROJECT ALLOCATION - $200,000)
     6             (DESIGN AND CONTINGENCIES - $2,343,000)
     7         (5)  SR 80, REPLACEMENT OF PRECAST
     8             PARAPETS, BRIDGES WITH HOAN-LIKE
     9             DETAILS, GROUP C, I-80, SEGMENT 3044
    10             AND SEGMENT 3050, VARIOUS
    11             MUNICIPALITIES                              2,134,000
    12             (BASE PROJECT ALLOCATION - $80,000)
    13             (DESIGN AND CONTINGENCIES - $2,054,000)
    14         (6)  SR 80, INSTALL DYNAMIC MESSAGE SIGNS
    15             AND CLOSED CIRCUIT TELEVISION CAMERAS,
    16             I-80 CORRIDOR, ROUND 1, VARIOUS
    17             MUNICIPALITIES                                300,000
    18             (BASE PROJECT ALLOCATION - $150,000)
    19             (DESIGN AND CONTINGENCIES - $150,000)
    20         (7)  SR 80, INSTALL DYNAMIC MESSAGE SIGNS
    21             AND CLOSED CIRCUIT TELEVISION CAMERAS,
    22             I-80 CORRIDOR, ROUND 2, VARIOUS
    23             MUNICIPALITIES                                330,000
    24             (BASE PROJECT ALLOCATION - $150,000)
    25             (DESIGN AND CONTINGENCIES - $180,000)
    26         (8)  SR 80, INSTALL DYNAMIC MESSAGE SIGNS,
    27             CLOSED CIRCUIT TELEVISION CAMERAS,
    28             HIGHWAY ADVISORY RADIO AND HIGHWAY
    29             ADVISORY RADIO BEACONS, I-80 AND I-380
    30             CORRIDORS, VARIOUS MUNICIPALITIES             345,000
    20080S1504B2377                 - 95 -     

     1             (BASE PROJECT ALLOCATION - $65,000)
     2             (LAND ALLOCATION - $10,000)
     3             (DESIGN AND CONTINGENCIES - $270,000)
     4         (9)  SR 80, INSTALL DYNAMIC MESSAGE SIGNS
     5             AND CLOSED CIRCUIT TELEVISION CAMERAS,
     6             I-80 AND I-380 CORRIDORS, ROUND 4,
     7             VARIOUS MUNICIPALITIES                        320,000
     8             (BASE PROJECT ALLOCATION - $175,000)
     9             (DESIGN AND CONTINGENCIES - $145,000)
    10         (10)  SR 80, INSTALL DYNAMIC MESSAGE SIGNS,
    11             I-80 AND I-380 CORRIDORS, ROUND 5,
    12             VARIOUS MUNICIPALITIES                        300,000
    13             (BASE PROJECT ALLOCATION - $150,000)
    14             (LAND ALLOCATION - $45,000)
    15             (DESIGN AND CONTINGENCIES - $105,000)
    16         (11)  SR 447, SIGNALIZATION AND
    17             CONSTRUCTION OF DEDICATED TURNING
    18             LANES, SR 447 AND BRUSHY MOUNTAIN ROAD,
    19             STROUD TOWNSHIP                             1,500,000
    20             (BASE PROJECT ALLOCATION - $1,500,000)
    21         (12)  I-380, INSTERSTATE RESTORATION AND
    22             RECONSTRUCTION                             13,100,000
    23             (BASE PROJECT ALLOCATION - $13,100,000)
    24         (13)  I-80, INTERSTATE RESTORATION AND
    25             RECONSTRUCTION                             27,300,000
    26             (BASE PROJECT ALLOCATION - $27,300,000)
    27         (14)  SR 611, INTERSECTION IMPROVEMENT,
    28             REALIGNMENT, CONSTRUCT A CONNECTOR ROAD
    29             TO CONNECT SR 196 TO SR 611                   476,000
    30             (BASE PROJECT ALLOCATION - $361,000)
    20080S1504B2377                 - 96 -     

     1             (DESIGN AND CONTINGENCIES - $115,000)
     2         (15)  SR 33, MEDIAN BARRIER INSTALLATION          763,000
     3             (BASE PROJECT ALLOCATION - $500,000)
     4             (LAND ALLOCATION - $243,000)
     5             (DESIGN AND CONTINGENCIES - $20,000)
     6  SECTION 346.  MONTGOMERY COUNTY.
     7     PROJECTS ARE AS FOLLOWS:
     8         (1)  SR 1012, WIDENING OF APPROACHES TO
     9             PROVIDE LEFT AND RIGHT TURN LANES AND
    10             INTERSECTION IMPROVEMENTS, LOWER ROAD
    11             FROM ALLENTOWN ROAD TO INTERSECTIONS AT
    12             COWPATH ROAD AND INTERSECTIONS AT SR
    13             1012, GODSHALL ROAD, FRANCONIA
    14             TOWNSHIP                                      400,000
    15             (BASE PROJECT ALLOCATION - $400,000)
    16         (2)  SR 202, RECONSTRUCTION AND WIDENING,
    17             US 202, HANCOCK ROAD TO PA 309, NO.1,
    18             LOWER GWYNEDD, MONTGOMERY AND UPPER
    19             GWYNEDD TOWNSHIPS                           6,702,000
    20             (BASE PROJECT ALLOCATION - $5,900,000)
    21             (LAND ALLOCATION - $802,000)
    22         (3)  SR 23, CONSTRUCT FOUR-LANE CONTROLLED
    23             ACCESS HIGHWAY, APPROXIMATELY 3.5 MILES
    24             IN LENGTH, SR 23 BETWEEN US 422 AND
    25             DEKALB PIKE, US 202, UPPER MERION
    26             TOWNSHIP                                   11,100,000
    27             (BASE PROJECT ALLOCATION - $10,000,000)
    28             (LAND ALLOCATION - $500,000)
    29             (DESIGN AND CONTINGENCIES - $600,000)
    30         (4)  SR 3001, RELOCATION, REALIGNMENT,
    20080S1504B2377                 - 97 -     

     1             NORRISTOWN ROAD AT STENTON AVENUE AND
     2             NARCISSA ROAD, WHITPAIN TOWNSHIP              200,000
     3             (BASE PROJECT ALLOCATION - $200,000)
     4         (5)  SR 3029, ROAD WIDENING, I-76
     5             INTERSECTION AND HENDERSON ROAD, UPPER
     6             MERION TOWNSHIP                             2,920,000
     7             (BASE PROJECT ALLOCATION - $2,000,000)
     8             (LAND ALLOCATION - $400,000)
     9             (DESIGN AND CONTINGENCIES - $520,000)
    10         (6)  SR 4028, REALIGNMENT AND WIDENING TO
    11             SOFTEN CURVE, SR 4028, PLEASANT VIEW
    12             ROAD, LOWER POTTSGROVE TOWNSHIP               120,000
    13             (BASE PROJECT ALLOCATION - $120,000)
    14         (7)  SR 422, CORRIDOR SAFETY IMPROVEMENT,
    15             US 422 INTERIM IMPROVEMENTS, LOWER
    16             PROVIDENCE, MONTGOMERY, UPPER MERION
    17             AND WEST NORRITON TOWNSHIPS                 1,025,000
    18             (BASE PROJECT ALLOCATION - $1,000,000)
    19             (LAND ALLOCATION - $25,000)
    20         (8)  SR 476, ITS RECONSTRUCTION AND
    21             PURCHASES, I-476 SCHUYLKILL RIVER
    22             BRIDGE REDECKING, COMPANION PROJECT,
    23             CONSHOHOCKEN BOROUGH AND PLYMOUTH
    24             TOWNSHIP                                    1,230,000
    25             (BASE PROJECT ALLOCATION - $1,230,000)
    26         (9)  SR 476, HIGHWAY RECONSTRUCTION, I-476
    27             FROM SCHUYLKILL EXPRESSWAY, I-76, TO
    28             PENNSYLVANIA TURNPIKE, I-276,
    29             CONSHOHOCKEN AND WEST CONSHOHOCKEN
    30             BOROUGHS, LOWER MERION AND PLYMOUTH
    20080S1504B2377                 - 98 -     

     1             TOWNSHIPS                                 101,500,000
     2             (BASE PROJECT ALLOCATION -
     3             $100,000,000)
     4             (LAND ALLOCATION - $1,500,000)
     5         (10)  SR 73, CORRIDOR SAFETY IMPROVEMENT,
     6             INTERSECTION IMPROVEMENT, PA 73 FROM US
     7             202 TO BUTLER PIKE, SKIPPACK AND UPPER
     8             MERION TOWNSHIPS                              560,000
     9             (BASE PROJECT ALLOCATION - $560,000)
    10         (11)  SR 9102, EXTENSION, ADD LANE,
    11             LAFAYETTE STREET CORRIDOR, NORRISTOWN
    12             BOROUGH AND UPPER MERION TOWNSHIP           9,000,000
    13             (BASE PROJECT ALLOCATION - $9,000,000)
    14         (12)  US 202, ADD LANE, WIDEN, RESTORATION,
    15             REHABILITATION, SAFETY IMPROVEMENTS, US
    16             202, MARKLEY STREET IMPROVEMENT,
    17             NORRISTOWN BOROUGH                          3,680,000
    18             (BASE PROJECT ALLOCATION - $3,400,000)
    19             (LAND ALLOCATION - $280,000)
    20         (13)  EXISTING SIGNAL IMPROVEMENT, WIDEN,
    21             MARKLEY STREET IMPROVEMENT, HARDING
    22             BOULEVARD TO JOHNSON STREET, NORRISTOWN
    23             BOROUGH                                     3,000,000
    24             (BASE PROJECT ALLOCATION - $2,800,000)
    25             (LAND ALLOCATION - $200,000)
    26         (14)  I-476, INTERSTATE RESTORATION AND
    27             RECONSTRUCTION                              5,300,000
    28             (BASE PROJECT ALLOCATION - $5,300,000)
    29         (15)  I-76, INTERSTATE RESTORATION AND
    30             RECONSTRUCTION                             11,900,000
    20080S1504B2377                 - 99 -     

     1             (BASE PROJECT ALLOCATION - $11,900,000)
     2         (16)  PA 463, WIDEN TO FOUR LANES                 995,000
     3             (BASE PROJECT ALLOCATION - $995,000)
     4         (17)  SR 2001, INTERSECTION IMPROVEMENT,
     5             TURN LANES AND SIGNALS                        400,000
     6             (BASE PROJECT ALLOCATION - $360,000)
     7             (DESIGN AND CONTINGENCIES - $40,000)
     8         (18)  SR 2027, INTERSECTION IMPROVEMENT,
     9             TRAFFIC SIGNAL, ALIGN CAMP HILL ROAD
    10             WITH PA AVENUE, LEFT TURN LANES             1,065,000
    11             (BASE PROJECT ALLOCATION - $784,000)
    12             (LAND ALLOCATION - $187,000)
    13             (DESIGN AND CONTINGENCIES - $94,000)
    14         (19)  SR 2038, INTERSECTION IMPROVEMENT,
    15             WIDEN FOR SOUTH BOUND RIGHT TURN LANE         234,000
    16             (BASE PROJECT ALLOCATION - $200,000)
    17             (LAND ALLOCATION - $20,000)
    18             (DESIGN AND CONTINGENCIES - $14,000)
    19         (20)  US 202, WIDEN, INTERSECTION UPGRADES
    20             AND STRUCTURE REHABILITATION                  400,000
    21             (LAND ALLOCATION - $400,000)
    22  SECTION 347.  MONTOUR COUNTY.
    23     PROJECTS ARE AS FOLLOWS:
    24         (1)  I-80, INTERSTATE RESTORATION AND
    25             RECONSTRUCTION                             10,900,000
    26             (BASE PROJECT ALLOCATION - $10,900,000)
    27         (2)  SR 11, RESURFACING AND RESTORATION         1,290,000
    28             (BASE PROJECT ALLOCATION - $1,280,000)
    29             (LAND ALLOCATION - $10,000)
    30         (3)  SR 11, RESURFACING AND RESTORATION         1,290,000
    20080S1504B2377                 - 100 -    

     1             (BASE PROJECT ALLOCATION - $1,280,000)
     2             (LAND ALLOCATION - $10,000)
     3         (4)  SR 44, RESURFACING AND RESTORATION            10,000
     4             (LAND ALLOCATION - $10,000)
     5         (5)  SR 54, RESURFACING AND RESTORATION            10,000
     6             (LAND ALLOCATION - $10,000)
     7         (6)  SR 54, RESURFACING AND RESTORATION            10,000
     8             (LAND ALLOCATION - $10,000)
     9         (7)  SR 642, RESURFACING AND RESTORATION        1,510,000
    10             (BASE PROJECT ALLOCATION - $1,500,000)
    11             (LAND ALLOCATION - $10,000)
    12  SECTION 348.  NORTHAMPTON COUNTY.
    13     PROJECTS ARE AS FOLLOWS:
    14         (1)  SR 191 AND SR 248, INSTALLATION OF A
    15             CLOSED LOOP SYSTEM, SR 191 AND SR 248
    16             INTERSECTION, NAZARETH BOROUGH                400,000
    17             (BASE PROJECT ALLOCATION - $55,000)
    18             (LAND ALLOCATION - $5,000)
    19             (DESIGN AND CONTINGENCIES - $340,000)
    20         (2)  SR 33, EXPANSION OF EXISTING PARK AND
    21             RIDE FACILITY, SR 33, PARK AND RIDE
    22             LOT, BETHLEHEM TOWNSHIP                     5,000,000
    23             (BASE PROJECT ALLOCATION - $100,000)
    24             (LAND ALLOCATION - $200,000)
    25             (DESIGN AND CONTINGENCIES - $4,700,000)
    26         (3)  SR 378, RAMP RECONFIGURATION, 412
    27             SECOND STREET RAMP, CITY OF BETHLEHEM       1,740,000
    28             (BASE PROJECT ALLOCATION - $1,620,000)
    29             (LAND ALLOCATION - $120,000)
    30         (4)  SR 611, CORRIDOR MANAGEMENT PLAN TO
    20080S1504B2377                 - 101 -    

     1             PRESERVE SCENIC, HISTORIC AND CULTURAL
     2             QUALITIES, DELAWARE RIVER VALLEY SCENIC
     3             BYWAY, LOWER MT. BETHEL AND WILLIAMS
     4             TOWNSHIPS                                     700,000
     5             (BASE PROJECT ALLOCATION - $115,000)
     6             (LAND ALLOCATION - $85,000)
     7             (DESIGN AND CONTINGENCIES - $500,000)
     8         (5)  SR 611, FLASHING WARNING DEVICES, ROCK
     9             EXCAVATION, MEDIAN BARRIER, RETAINING
    10             WALL, SHOULDERS, SR 611, CANAL LOCK
    11             CURVES, WILLIAMS TOWNSHIP                     700,000
    12             (BASE PROJECT ALLOCATION - $150,000)
    13             (LAND ALLOCATION - $50,000)
    14             (DESIGN AND CONTINGENCIES - $500,000)
    15         (6)  SR 611, DRAINAGE, REMOVE CURBS,
    16             SHOULDERS, GUIDE RAIL AND UTILITY POLE,
    17             SR 611 SAFETY IMPROVEMENT, WILLIAMS
    18             TOWNSHIP, CITY OF EASTON                      600,000
    19             (BASE PROJECT ALLOCATION - $150,000)
    20             (LAND ALLOCATION - $50,000)
    21             (DESIGN AND CONTINGENCIES - $400,000)
    22         (7)  SR 33 AND SR 1002, PALMER TOWNSHIP
    23             INTERCHANGE, PALMER TOWNSHIP               23,000,000
    24             (BASE PROJECT ALLOCATION - $23,000,000)
    25         (8)  I-78, INTERSTATE RESTORATION AND
    26             RECONSTRUCTION                             11,900,000
    27             (BASE PROJECT ALLOCATION - $11,900,000)
    28         (9)  SR 378, CONVERT TRAFFIC FLOW ONE WAY
    29             AND TWO WAY                                   500,000
    30             (BASE PROJECT ALLOCATION - $500,000)
    20080S1504B2377                 - 102 -    

     1         (10)  SR 412, PARK AND RIDE LOT, INTERMODAL
     2             SERVICES                                      167,000
     3             (BASE PROJECT ALLOCATION - $167,000)
     4         (11)  SR 378, RELOCATE AND WIDEN THE RAMP       1,740,000
     5             (BASE PROJECT ALLOCATION - $1,620,000)
     6             (DESIGN AND CONTINGENCIES - $120,000)
     7  SECTION 349.  NORTHUMBERLAND COUNTY.
     8     PROJECTS ARE AS FOLLOWS:
     9         (1)  SR 4012, RESURFACE, REHABILITATION, SR
    10             4012 FROM ZIMMERMAN'S HOLLOW ROAD TO SR
    11             487, SNYDERTOWN BOROUGH, RALPHO,
    12             SHAMOKIN AND UPPER AUGUSTA TOWNSHIPS        2,500,000
    13             (BASE PROJECT ALLOCATION - $2,500,000)
    14         (2)  SR 61, CONGESTED CORRIDOR IMPROVEMENT
    15             PROGRAM, CORRIDOR SAFETY IMPROVEMENT,
    16             SR 61 FROM SR 890 TO SR 147, UPPER
    17             AUGUSTA TOWNSHIP, CITY OF SUNBURY              50,000
    18             (DESIGN AND CONTINGENCIES - $50,000)
    19         (3)  I-180, INTERSTATE RESTORATION AND
    20             RECONSTRUCTION                              8,900,000
    21             (BASE PROJECT ALLOCATION - $8,900,000)
    22         (4)  I-80, INTERSTATE RESTORATION AND
    23             RECONSTRUCTION                              5,000,000
    24             (BASE PROJECT ALLOCATION - $5,000,000)
    25         (5)  SR 147, RESURFACING AND RESTORATION          710,000
    26             (BASE PROJECT ALLOCATION - $700,000)
    27             (LAND ALLOCATION - $10,000)
    28         (6)  SR 225, RESURFACING AND RESTORATION          437,000
    29             (BASE PROJECT ALLOCATION - $432,000)
    30             (LAND ALLOCATION - $5,000)
    20080S1504B2377                 - 103 -    

     1         (7)  SR 225, RESURFACING AND RESTORATION          970,000
     2             (BASE PROJECT ALLOCATION - $960,000)
     3             (LAND ALLOCATION - $10,000)
     4         (8)  SR 225, RESURFACING AND RESTORATION        1,110,000
     5             (BASE PROJECT ALLOCATION - $1,100,000)
     6             (LAND ALLOCATION - $10,000)
     7         (9)  SR 4006, RESURFACING AND RESTORATION       1,107,000
     8             (BASE PROJECT ALLOCATION - $1,097,000)
     9             (LAND ALLOCATION - $10,000)
    10         (10)  SR 54, RESURFACING AND RESTORATION          320,000
    11             (BASE PROJECT ALLOCATION - $310,000)
    12             (LAND ALLOCATION - $10,000)
    13         (11)  SR 54, RESURFACING AND RESTORATION          970,000
    14             (BASE PROJECT ALLOCATION - $960,000)
    15             (LAND ALLOCATION - $10,000)
    16         (12)  SR 61, RESURFACING AND RESTORATION          785,000
    17             (BASE PROJECT ALLOCATION - $775,000)
    18             (LAND ALLOCATION - $10,000)
    19  SECTION 350.  PERRY COUNTY.
    20     PROJECTS ARE AS FOLLOWS:
    21         (1)  SR 274, INTERSECTION IMPROVEMENT, ADD
    22             TURNING LANES                                 475,000
    23             (BASE PROJECT ALLOCATION - $475,000)
    24         (2)  SR 34, INTERSECTION IMPROVEMENT            2,420,000
    25             (LAND ALLOCATION - $920,000)
    26             (DESIGN AND CONTINGENCIES - $1,500,000)
    27  SECTION 351.  PHILADELPHIA COUNTY.
    28     PROJECTS ARE AS FOLLOWS:
    29         (1)  SIGNAL IMPROVEMENTS, CONGESTION
    30             REDUCTION, 34TH STREET, MANTUA AVENUE
    20080S1504B2377                 - 104 -    

     1             TO SPRUCE STREET, CITY OF PHILADELPHIA        220,000
     2             (BASE PROJECT ALLOCATION - $220,000)
     3         (2)  SR 676, HIGHWAY AND STRUCTURE
     4             REPLACEMENT, RECONSTRUCTION, VINE
     5             STREET EXPRESSWAY, 7 BRIDGE PROJECT,
     6             CITY OF PHILADELPHIA                        4,373,000
     7             (BASE PROJECT ALLOCATION - $460,000)
     8             (LAND ALLOCATION - $143,000)
     9             (DESIGN AND CONTINGENCIES - $3,770,000)
    10         (3)  SR 76, TRAFFIC SYSTEM MANAGEMENT, I-76
    11             REGIONAL TRAVEL INFORMATION,
    12             CONSHOHOCKEN AND WEST CONSHOHOCKEN
    13             BOROUGHS, LOWER MERION AND UPPER MERION
    14             TOWNSHIPS AND CITY OF PHILADELPHIA            667,000
    15             (BASE PROJECT ALLOCATION - $417,000)
    16             (DESIGN AND CONTINGENCIES - $250,000)
    17         (4)  SR 95, SURFACE STREET RECONSTRUCTION
    18             ALONG WITH SEVERAL RAMPS, INTERCHANGE
    19             IMPROVEMENT AND WIDENING, COTTMAN-
    20             PRINCETON LOCAL STREET RAMP, CITY OF
    21             PHILADELPHIA                                3,400,000
    22             (BASE PROJECT ALLOCATION - $2,500,000)
    23             (LAND ALLOCATION - $900,000)
    24         (5)  SR 95, UTILITY RELOCATION, WATER AND
    25             SEWER, RETAINING WALLS, SIGNAL
    26             IMPROVEMENTS AND SURFACE STREETS
    27             RECONSTRUCTION, I-95 CORRIDOR,
    28             WISSINOMING AVENUE, BLEIGH AVENUE,
    29             MILNOR STREET, CITY OF PHILADELPHIA         2,000,000
    30             (BASE PROJECT ALLOCATION - $1,500,000)
    20080S1504B2377                 - 105 -    

     1             (LAND ALLOCATION - $500,000)
     2         (6)  I-76, INTERSTATE RESTORATION AND
     3             RECONSTRUCTION                              7,500,000
     4             (BASE PROJECT ALLOCATION - $7,500,000)
     5         (7)  I-676, INTERSTATE RESTORATION AND
     6             RECONSTRUCTION                              1,500,000
     7             (BASE PROJECT ALLOCATION - $1,500,000)
     8         (8)  I-95, INTERSTATE RESTORATION AND
     9             RECONSTRUCTION                             21,000,000
    10             (BASE PROJECT ALLOCATION - $21,000,000)
    11  SECTION 352.  PIKE COUNTY.
    12     PROJECTS ARE AS FOLLOWS:
    13         (1)  SR 2001, RESTORATION AND
    14             RECONSTRUCTION, MILFORD TO BUSHKILL
    15             NO.5, ROCKLEDGE ROAD TO SR 739 AND
    16             INCLUDING SR 739, DELAWARE TOWNSHIP         3,400,000
    17             (BASE PROJECT ALLOCATION - $2,400,000)
    18             (LAND ALLOCATION - $1,000,000)
    19         (2)  SR 84, RECONSTRUCTION, I-84, PIKE
    20             COUNTY, BLOOMING GROVE AND DINGMAN
    21             TOWNSHIPS                                   4,140,000
    22             (BASE PROJECT ALLOCATION - $3,600,000)
    23             (DESIGN AND CONTINGENCIES - $540,000)
    24         (3)  SR 84, ITS IMPROVEMENTS AND PURCHASES,
    25             I-84 CORRIDOR, VARIOUS MUNICIPALITIES         480,000
    26             (BASE PROJECT ALLOCATION - $400,000)
    27             (DESIGN AND CONTINGENCIES - $80,000)
    28         (4)  I-84, INTERSTATE RESTORATION AND
    29             RECONSTRUCTION                             35,100,000
    30             (BASE PROJECT ALLOCATION - $35,100,000)
    20080S1504B2377                 - 106 -    

     1         (5)  SR 739, SAFETY IMPROVEMENT, STRAIGHTEN
     2             CURVE AND RESTORATION                         109,000
     3             (DESIGN AND CONTINGENCIES - $109,000)
     4  SECTION 353.  POTTER COUNTY.
     5     PROJECTS ARE AS FOLLOWS:
     6         (1)  SR 6, TURN LANES, SAFETY IMPROVEMENT,
     7             SR 6 AND SR 872, COUDERSPORT BOROUGH
     8             AND EULALIA TOWNSHIP                          300,000
     9             (BASE PROJECT ALLOCATION - $200,000)
    10             (LAND ALLOCATION - $25,000)
    11             (DESIGN AND CONTINGENCIES - $75,000)
    12  SECTION 354.  SCHUYLKILL COUNTY.
    13     PROJECTS ARE AS FOLLOWS:
    14         (1)  SR 2002, REPLACEMENT OF PRECAST
    15             PARAPETS, GROUP D, SR 2002 CORRIDOR,
    16             PORT CARBON BOROUGH                           320,000
    17             (BASE PROJECT ALLOCATION - $100,000)
    18             (DESIGN AND CONTINGENCIES - $220,000)
    19         (2)  SR 61, INTERIM TRAFFIC SIGNAL, SR 61
    20             AND SR 895 INTERSECTION, DEER LAKE
    21             BOROUGH                                       300,000
    22             (BASE PROJECT ALLOCATION - $50,000)
    23             (LAND ALLOCATION - $50,000)
    24             (DESIGN AND CONTINGENCIES - $200,000)
    25         (3)  SR 61, UPGRADE SIGNALIZATION, SR 61,
    26             TUNNEL ROAD, EAST NORWEGIAN TOWNSHIP          325,000
    27             (BASE PROJECT ALLOCATION - $50,000)
    28             (LAND ALLOCATION - $50,000)
    29             (DESIGN AND CONTINGENCIES - $225,000)
    30         (4)  SR 61, MEDIAN BARRIER INSTALLATION, SR
    20080S1504B2377                 - 107 -    

     1             61, MEDIAN BARRIER, ORWIGSBURG BOROUGH,
     2             NORTH MANHEIM AND WEST BRUNSWICK
     3             TOWNSHIPS                                     300,000
     4             (BASE PROJECT ALLOCATION - $50,000)
     5             (LAND ALLOCATION - $10,000)
     6             (DESIGN AND CONTINGENCIES - $240,000)
     7         (5)  SR 61, INTERIM TRAFFIC SIGNAL, SR 61,
     8             BRICK HILL ROAD, WEST BRUNSWICK
     9             TOWNSHIP                                      300,000
    10             (BASE PROJECT ALLOCATION - $50,000)
    11             (LAND ALLOCATION - $50,000)
    12             (DESIGN AND CONTINGENCIES - $200,000)
    13         (6)  SR 61, PAVEMENT RESTORATION,
    14             REHABILITATION, INTERSTATE IMPROVEMENT,
    15             I-81 LEBANON COUNTY LINE TO PINE GROVE,
    16             PINE GROVE TOWNSHIP                         1,074,000
    17             (BASE PROJECT ALLOCATION - $840,000)
    18             (LAND ALLOCATION - $80,000)
    19             (DESIGN AND CONTINGENCIES - $154,000)
    20         (7)  SR 81, INSTALL DYNAMIC MESSAGE SIGNS
    21             AND CLOSED CIRCUIT TELEVISION CAMERAS,
    22             I-81 CORRIDOR, ROUND 1, VARIOUS
    23             MUNICIPALITIES                                415,000
    24             (BASE PROJECT ALLOCATION - $200,000)
    25             (DESIGN AND CONTINGENCIES - $215,000)
    26         (8)  SR 81, INSTALL DYNAMIC MESSAGE SIGNS,
    27             CLOSED CIRCUIT TELEVISION CAMERAS,
    28             HIGHWAY ADVISORY RADIO AND HIGHWAY
    29             ADVISORY RADIO BEACONS, I-81 CORRIDOR,
    30             ROUND 2, VARIOUS MUNICIPALITIES               315,000
    20080S1504B2377                 - 108 -    

     1             (BASE PROJECT ALLOCATION - $65,000)
     2             (LAND ALLOCATION - $10,000)
     3             (DESIGN AND CONTINGENCIES - $240,000)
     4         (9)  SR 1006, WADE ROAD, RECONSTRUCTION
     5             FROM SR 1028 TO ROUTE 61, ST. CLAIR
     6             BOROUGH                                     3,000,000
     7             (BASE PROJECT ALLOCATION - $3,000,000)
     8         (10)  I-81, INTERSTATE RESTORATION AND
     9             RECONSTRUCTION                             42,300,000
    10             (BASE PROJECT ALLOCATION - $42,300,000)
    11  SECTION 355.  SNYDER COUNTY.
    12     PROJECTS ARE AS FOLLOWS:
    13         (1)  SR 1017, RESURFACING AND RESTORATION       1,210,000
    14             (BASE PROJECT ALLOCATION - $1,200,000)
    15             (LAND ALLOCATION - $10,000)
    16         (2)  SR 1023, RESURFACING AND RESTORATION         320,000
    17             (BASE PROJECT ALLOCATION - $310,000)
    18             (LAND ALLOCATION - $10,000)
    19         (3)  SR 104, RESURFACING AND RESTORATION          205,000
    20             (BASE PROJECT ALLOCATION - $200,000)
    21             (LAND ALLOCATION - $5,000)
    22         (4)  SR 2017, RESURFACING AND RESTORATION         635,000
    23             (BASE PROJECT ALLOCATION - $625,000)
    24             (LAND ALLOCATION - $10,000)
    25         (5)  SR 235, RESURFACING AND RESTORATION        1,010,000
    26             (BASE PROJECT ALLOCATION - $1,000,000)
    27             (LAND ALLOCATION - $10,000)
    28         (6)  SR 235, RESURFACING AND RESTORATION        1,240,000
    29             (BASE PROJECT ALLOCATION - $1,230,000)
    30             (LAND ALLOCATION - $10,000)
    20080S1504B2377                 - 109 -    

     1         (7)  SR 35, RESURFACING AND RESTORATION         1,510,000
     2             (BASE PROJECT ALLOCATION - $1,500,000)
     3             (LAND ALLOCATION - $10,000)
     4         (8)  SR 522, RESURFACING AND RESTORATION        1,175,000
     5             (BASE PROJECT ALLOCATION - $1,165,000)
     6             (LAND ALLOCATION - $10,000)
     7         (9)  SR 522, RESURFACING AND RESTORATION           10,000
     8             (LAND ALLOCATION - $10,000)
     9         (10)  SR 522, RESURFACING AND RESTORATION         305,000
    10             (BASE PROJECT ALLOCATION - $300,000)
    11             (LAND ALLOCATION - $5,000)
    12  SECTION 356.  SOMERSET COUNTY.
    13     PROJECTS ARE AS FOLLOWS:
    14         (1)  SR 219, NEW FOUR-LANE ROADWAY
    15             ALIGNMENT, US 219, GARRETT, END OF
    16             EXISTING FOUR-LANE IN SOMERSET TOWNSHIP
    17             TO MEYERSDALE BYPASS IN SUMMIT
    18             TOWNSHIP, BROTHERSVALLEY, SOMERSET AND
    19             SUMMIT TOWNSHIPS                           36,000,000
    20             (BASE PROJECT ALLOCATION - $27,000,000)
    21             (LAND ALLOCATION - $7,000,000)
    22             (DESIGN AND CONTINGENCIES - $2,000,000)
    23         (2)  SR 219, PAVING, NEW FOUR-LANE ROADWAY
    24             ALIGNMENT, US 219, GARRETT, END OF
    25             EXISTING FOUR-LANE IN SOMERSET TOWNSHIP
    26             TO MEYERSDALE BYPASS IN SUMMIT
    27             TOWNSHIP, BROTHERSVALLEY, SOMERSET AND
    28             SUMMIT TOWNSHIPS                           14,000,000
    29             (BASE PROJECT ALLOCATION - $14,000,000)
    30         (3)  SR 219, CONSTRUCTION, NEW FOUR-LANE
    20080S1504B2377                 - 110 -    

     1             ALIGNMENT, US 219, GARRETT, END OF
     2             EXISTING FOUR-LANE IN SOMERSET TOWNSHIP
     3             TO MEYERSDALE BYPASS IN SUMMIT
     4             TOWNSHIP, BROTHERSVALLEY, SOMERSET AND
     5             SUMMIT TOWNSHIPS                           20,000,000
     6             (BASE PROJECT ALLOCATION - $20,000,000)
     7         (4)  SR 219, NEW FOUR-LANE ROADWAY
     8             ALIGNMENT, US 219, I-68, MARYLAND TO
     9             MEYERSDALE BYPASS, SALISBURY BOROUGH,
    10             ELK LICK AND SUMMIT TOWNSHIPS              51,000,000
    11             (BASE PROJECT ALLOCATION - $40,000,000)
    12             (LAND ALLOCATION - $6,000,000)
    13             (DESIGN AND CONTINGENCIES - $5,000,000)
    14         (5)  SR 3029, RECONSTRUCTION, REAM ROAD, T-
    15             362, INTERSECTION TO SEVEN SPRINGS
    16             BOROUGH LINE, SEVEN SPRINGS BOROUGH,
    17             MIDDLECREEK AND MILFORD TOWNSHIPS           7,450,000
    18             (BASE PROJECT ALLOCATION - $6,600,000)
    19             (LAND ALLOCATION - $550,000)
    20             (DESIGN AND CONTINGENCIES - $300,000)
    21         (6)  PA 160, SAFETY IMPROVEMENT,
    22             CONSTRUCTION OF A RUNAWAY TRUCK RAMP          772,000
    23             (BASE PROJECT ALLOCATION - $270,000)
    24             (LAND ALLOCATION - $387,000)
    25             (DESIGN AND CONTINGENCIES - $115,000)
    26         (7)  PA 281, INTERSECTION IMPROVEMENT             755,000
    27             (BASE PROJECT ALLOCATION - $370,000)
    28             (LAND ALLOCATION - $200,000)
    29             (DESIGN AND CONTINGENCIES - $185,000)
    30         (8)  SR 3041, INTERSECTION IMPROVEMENT,
    20080S1504B2377                 - 111 -    

     1             CONSTRUCTION OF LEFT TURN LANES AND
     2             INCREASING THE ROADWAY CURVE RADIUS           301,000
     3             (BASE PROJECT ALLOCATION - $216,000)
     4             (LAND ALLOCATION - $85,000)
     5         (9)  SR 3010, HIGHWAY RESTORATION                 574,000
     6             (BASE PROJECT ALLOCATION - $574,000)
     7         (10)  SR 3037, OVERLAY AND INTERSECTION
     8             IMPROVEMENT                                 2,300,000
     9             (BASE PROJECT ALLOCATION - $2,300,000)
    10  SECTION 357.  SULLIVAN COUNTY.
    11     PROJECTS ARE AS FOLLOWS:
    12         (1)  SR 1015, WIDEN AND RESURFACE, SR 1015
    13             FROM SR 87 TO BRADFORD COUNTY LINE,
    14             CHERRY TOWNSHIP                               422,000
    15             (BASE PROJECT ALLOCATION - $404,000)
    16             (DESIGN AND CONTINGENCIES - $18,000)
    17         (2)  SR 220, RECONSTRUCT TO 24-FOOT, TWO-
    18             LANE HIGHWAY                                1,460,000
    19             (BASE PROJECT ALLOCATION - $1,456,000)
    20             (DESIGN AND CONTINGENCIES - $4,000)
    21         (3)  SR 220, RESURFACING AND RESTORATION           10,000
    22             (LAND ALLOCATION - $10,000)
    23         (4)  SR 220, RESURFACING AND RESTORATION           25,000
    24             (LAND ALLOCATION - $25,000)
    25         (5)  SR 42, RESURFACING AND RESTORATION            25,000
    26             (LAND ALLOCATION - $25,000)
    27         (6)  SR 87, RESURFACING AND RESTORATION            43,000
    28             (BASE PROJECT ALLOCATION - $3,000)
    29             (LAND ALLOCATION - $40,000)
    30  SECTION 358.  SUSQUEHANNA COUNTY.
    20080S1504B2377                 - 112 -    

     1     PROJECTS ARE AS FOLLOWS:
     2         (1)  SR 81, ITS IMPROVEMENTS AND PURCHASES,
     3             I-81 CORRIDOR, VARIOUS MUNICIPALITIES         480,000
     4             (BASE PROJECT ALLOCATION - $400,000)
     5             (DESIGN AND CONTINGENCIES - $80,000)
     6         (2)  SR 2030, REMOVE EXISTING CONCRETE
     7             RAILROAD BRIDGE ABUTMENTS                     152,000
     8             (BASE PROJECT ALLOCATION - $152,000)
     9         (3)  I-81, INTERSTATE RESTORATION AND
    10             RECONSTRUCTION                             26,500,000
    11             (BASE PROJECT ALLOCATION - $26,500,000)
    12         (4)  SR 92, INTERSECTION IMPROVEMENT              380,000
    13             (BASE PROJECT ALLOCATION - $380,000)
    14         (5)  SR 81, INTERCHANGE IMPROVEMENT, RAMP
    15             REDESIGN                                      368,000
    16             (BASE PROJECT ALLOCATION - $100,000)
    17             (LAND ALLOCATION - $208,000)
    18             (DESIGN AND CONTINGENCIES - $60,000)
    19         (6)  SR 1033, ROADWAY AND SLOPE REPAIR            276,000
    20             (BASE PROJECT ALLOCATION - $250,000)
    21             (LAND ALLOCATION - $20,000)
    22             (DESIGN AND CONTINGENCIES - $6,000)
    23         (7)  SR 247, HIGHWAY RESTORATION                  336,000
    24             (BASE PROJECT ALLOCATION - $336,000)
    25         (8)  SR 267, ROADWAY AND SLOPE REPAIR             829,000
    26             (BASE PROJECT ALLOCATION - $805,000)
    27             (DESIGN AND CONTINGENCIES - $24,000)
    28         (9)  SR 29, RESTORATION, ROADWAY AND SLOPE
    29             REPAIR                                        420,000
    30             (BASE PROJECT ALLOCATION - $360,000)
    20080S1504B2377                 - 113 -    

     1             (LAND ALLOCATION - $50,000)
     2             (DESIGN AND CONTINGENCIES - $10,000)
     3         (10)  SR 3023, ROADWAY AND SLOPE REPAIR           518,000
     4             (BASE PROJECT ALLOCATION - $518,000)
     5  SECTION 359.  TIOGA COUNTY.
     6     PROJECTS ARE AS FOLLOWS:
     7         (1)  SR 2005, SLIDE REPAIR AND SLIDES
     8             CORRECTION, SR 2005, SEGMENT 0530,
     9             MANSFIELD BOROUGH, RICHMOND TOWNSHIP          980,000
    10             (BASE PROJECT ALLOCATION - $840,000)
    11             (LAND ALLOCATION - $20,000)
    12             (DESIGN AND CONTINGENCIES - $120,000)
    13         (2)  SR 15, STUDY TO DETERMINE NEEDS OF
    14             ROADWAY SIGNING AS I-99                       250,000
    15             (LAND ALLOCATION - $250,000)
    16         (3)  SR 15, RESURFACING AND RESTORATION         1,441,000
    17             (BASE PROJECT ALLOCATION - $1,375,000)
    18             (LAND ALLOCATION - $66,000)
    19         (4)  SR 15, HIGHWAY RESTORATION                    50,000
    20             (LAND ALLOCATION - $50,000)
    21         (5)  SR 2005, RESURFACING AND RESTORATION       2,037,000
    22             (BASE PROJECT ALLOCATION - $1,940,000)
    23             (LAND ALLOCATION - $97,000)
    24         (6)  SR 287, RESURFACING AND RESTORATION          480,000
    25             (BASE PROJECT ALLOCATION - $470,000)
    26             (LAND ALLOCATION - $10,000)
    27         (7)  SR 287, RESURFACING AND RESTORATION          380,000
    28             (BASE PROJECT ALLOCATION - $370,000)
    29             (LAND ALLOCATION - $10,000)
    30         (8)  SR 3019, RESURFACING AND RESTORATION       1,426,000
    20080S1504B2377                 - 114 -    

     1             (BASE PROJECT ALLOCATION - $1,360,000)
     2             (LAND ALLOCATION - $66,000)
     3         (9)  SR 4024, RESURFACING AND RESTORATION       2,118,000
     4             (BASE PROJECT ALLOCATION - $2,027,000)
     5             (LAND ALLOCATION - $91,000)
     6         (10)  SR 6, RESURFACING AND RESTORATION           735,000
     7             (BASE PROJECT ALLOCATION - $701,000)
     8             (LAND ALLOCATION - $34,000)
     9         (11)  SR 6, RESURFACING AND RESTORATION         2,020,000
    10             (BASE PROJECT ALLOCATION - $2,000,000)
    11             (LAND ALLOCATION - $20,000)
    12  SECTION 360.  UNION COUNTY.
    13     PROJECTS ARE AS FOLLOWS:
    14         (1)  SR 1004, SAFETY IMPROVEMENT, SR 1004
    15             FROM MANNING ROAD TO JPM ROAD, KELLY
    16             TOWNSHIP                                      119,000
    17             (BASE PROJECT ALLOCATION - $87,000)
    18             (LAND ALLOCATION - $22,000)
    19             (DESIGN AND CONTINGENCIES - $10,000)
    20         (2)  I-80, INTERSTATE RESTORATION AND
    21             RECONSTRUCTION                             16,000,000
    22             (BASE PROJECT ALLOCATION - $16,000,000)
    23         (3)  SR 192, RESURFACING AND RESTORATION          910,000
    24             (BASE PROJECT ALLOCATION - $900,000)
    25             (LAND ALLOCATION - $10,000)
    26         (4)  SR 235, RESURFACING AND RESTORATION        1,610,000
    27             (BASE PROJECT ALLOCATION - $1,600,000)
    28             (LAND ALLOCATION - $10,000)
    29         (5)  SR 45, RESURFACING AND RESTORATION         1,310,000
    30             (BASE PROJECT ALLOCATION - $1,300,000)
    20080S1504B2377                 - 115 -    

     1             (LAND ALLOCATION - $10,000)
     2         (6)  SR 45, RESURFACING AND RESTORATION         1,760,000
     3             (BASE PROJECT ALLOCATION - $1,750,000)
     4             (LAND ALLOCATION - $10,000)
     5         (7)  SR 45, HIGHWAY RECONSTRUCTION              3,150,000
     6             (BASE PROJECT ALLOCATION - $3,000,000)
     7             (LAND ALLOCATION - $150,000)
     8  SECTION 361.  VENANGO COUNTY.
     9     PROJECTS ARE AS FOLLOWS:
    10         (1)  WETLAND BANKING, DESIGN, CONSTRUCT AND
    11             MONITOR WETLANDS, PHASE II, POLK
    12             WETLANDS SITE, SANDYCREEK TOWNSHIP            430,000
    13             (BASE PROJECT ALLOCATION - $250,000)
    14             (LAND ALLOCATION - $50,000)
    15             (DESIGN AND CONTINGENCIES - $130,000)
    16         (2)  VARIOUS ROUTES, TRAFFIC SIGNAL PROGRAM
    17             FOR 2009, SAFETY IMPROVEMENTS,
    18             COUNTYWIDE, VARIOUS MUNICIPALITIES             50,000
    19             (BASE PROJECT ALLOCATION - $50,000)
    20         (3)  VARIOUS ROUTES, COUNTYWIDE TRAFFIC
    21             SIGNAL PROGRAM FOR 2010, SAFETY
    22             IMPROVEMENTS, COUNTYWIDE, VARIOUS
    23             MUNICIPALITIES                                 50,000
    24             (BASE PROJECT ALLOCATION - $50,000)
    25         (4)  I-80, INTERSTATE RESTORATION AND
    26             RECONSTRUCTION                             14,300,000
    27             (BASE PROJECT ALLOCATION - $14,300,000)
    28         (5)  SR 417, HIGHWAY RESTORATION                1,563,000
    29             (BASE PROJECT ALLOCATION - $1,563,000)
    30  SECTION 362.  WARREN COUNTY.
    20080S1504B2377                 - 116 -    

     1     PROJECTS ARE AS FOLLOWS:
     2         (1)  SR 62, TURNING LANE, EXISTING SIGNAL
     3             IMPROVEMENT, SR 62 FROM SR 1008, HATCH
     4             RUN ROAD, TO NEW YORK LINE, CONEWANGO
     5             AND PINE GROVE TOWNSHIPS                      630,000
     6             (BASE PROJECT ALLOCATION - $500,000)
     7             (LAND ALLOCATION - $30,000)
     8             (DESIGN AND CONTINGENCIES - $100,000)
     9  SECTION 363.  WASHINGTON COUNTY.
    10     PROJECTS ARE AS FOLLOWS:
    11         (1)  SR 1009, INTERSECTION IMPROVEMENT, SR
    12             1009, PIKE STREET, AND SR 4049, COUNTRY
    13             CLUB ROAD, CHARTIERS TOWNSHIP               1,325,000
    14             (BASE PROJECT ALLOCATION - $300,000)
    15             (LAND ALLOCATION - $500,000)
    16             (DESIGN AND CONTINGENCIES - $525,000)
    17         (2)  SR 18, HIGHWAY RESTORATION, ATLASBURG
    18             TO FOUR LANES, BURGETTSTOWN,
    19             BURGETTSTOWN BOROUGH AND SMITH
    20             TOWNSHIP                                      156,000
    21             (LAND ALLOCATION - $1,000)
    22             (DESIGN AND CONTINGENCIES - $155,000)
    23         (3)  SR 18, APPROACHES AND INTERSECTION
    24             IMPROVEMENT, PA 18 AT TYLERDALE,
    25             JEFFERSON AND WYLIE INTERSECTION, CITY
    26             OF WASHINGTON                               1,190,000
    27             (BASE PROJECT ALLOCATION - $1,000,000)
    28             (LAND ALLOCATION - $100,000)
    29             (DESIGN AND CONTINGENCIES - $90,000)
    30         (4)  SR 19, HIGHWAY RESTORATION, US 19 FROM
    20080S1504B2377                 - 117 -    

     1             CONKLIN ROAD TO PA 519, NORTH STRABANE
     2             TOWNSHIP                                       97,000
     3             (LAND ALLOCATION - $1,000)
     4             (DESIGN AND CONTINGENCIES - $96,000)
     5         (5)  SR 19, INTERSECTION IMPROVEMENT,
     6             INTERSECTION SR 19 AND GLENNCANNON
     7             DRIVE, NORTH STRABANE TOWNSHIP                100,000
     8             (BASE PROJECT ALLOCATION - $100,000)
     9         (6)  SR 40, HIGHWAY RESTORATION, SR 4,
    10             SEGMENT 0670 FROM BEALLSVILLE TO
    11             CENTERVILLE, CENTERVILLE BOROUGH, WEST
    12             PIKE RUN TOWNSHIP                           6,000,000
    13             (BASE PROJECT ALLOCATION - $6,000,000)
    14         (7)  SR 519, HIGHWAY RESTORATION, PA 519
    15             FROM US 40 TO I-70, BETTERMENT, NORTH
    16             BETHLEHEM AND SOMERSET TOWNSHIPS              147,000
    17             (LAND ALLOCATION - $1,000)
    18             (DESIGN AND CONTINGENCIES - $146,000)
    19         (8)  SR 70, RECONSTRUCTION, I-70, SEGMENT
    20             0040 TO SEGMENT 0100 AND SEGMENT 0041
    21             TO SEGMENT 0101, CLAYSVILLE BOROUGH,
    22             BUFFALO AND DONEGAL TOWNSHIPS               2,710,000
    23             (BASE PROJECT ALLOCATION - $2,410,000)
    24             (DESIGN AND CONTINGENCIES - $300,000)
    25         (9)  SR 70, RESTORATION, I-70, SEGMENT 0214
    26             TO SEGMENT 0305, SOMERSET AND SOUTH
    27             STRABANE TOWNSHIPS                            775,000
    28             (BASE PROJECT ALLOCATION - $775,000)
    29         (10)  SR 70, INTERSTATE RESTORATION,
    30             REHABILITATION AND REPAIR ON
    20080S1504B2377                 - 118 -    

     1             SUBSTRUCTURES OF 3 BRIDGES, I-70,
     2             SEGMENT 0180 TO SEGMENT 0215, SOUTH
     3             STRABANE TOWNSHIP                             480,000
     4             (BASE PROJECT ALLOCATION - $480,000)
     5         (11)  VARIOUS ROUTES, MISCELLANEOUS ITS
     6             IMPROVEMENTS AND PURCHASES, COUNTYWIDE,
     7             VARIOUS MUNICIPALITIES                        115,000
     8             (BASE PROJECT ALLOCATION - $80,000)
     9             (DESIGN AND CONTINGENCIES - $35,000)
    10         (12)  SR 136, INTERSECTION IMPROVEMENT,
    11             REALIGNMENT OF SR 136                         886,000
    12             (BASE PROJECT ALLOCATION - $760,000)
    13             (LAND ALLOCATION - $44,000)
    14             (DESIGN AND CONTINGENCIES - $82,000)
    15         (13)  I-70, INTERSTATE RESTORATION AND
    16             RECONSTRUCTION                             40,000,000
    17             (BASE PROJECT ALLOCATION - $40,000,000)
    18         (14)  I-79, INTERSTATE RESTORATION AND
    19             RECONSTRUCTION                             23,400,000
    20             (BASE PROJECT ALLOCATION - $23,400,000)
    21         (15)  PA 136, INTERSECTION IMPROVEMENT          3,363,000
    22             (BASE PROJECT ALLOCATION - $2,005,000)
    23             (LAND ALLOCATION - $689,000)
    24             (DESIGN AND CONTINGENCIES - $649,000)
    25         (16)  SR 1002, INTERSECTION IMPROVEMENT AND
    26             SIGNALIZATION                               1,581,000
    27             (BASE PROJECT ALLOCATION - $1,515,000)
    28             (DESIGN AND CONTINGENCIES - $66,000)
    29         (17)  SR 19, HIGHWAY RESTORATION                1,120,000
    30             (BASE PROJECT ALLOCATION - $1,120,000)
    20080S1504B2377                 - 119 -    

     1         (18)  SR 519, INTERSECTION IMPROVEMENT,
     2             TRAFFIC SIGNAL AND TURNING LANES              258,000
     3             (BASE PROJECT ALLOCATION - $169,000)
     4             (LAND ALLOCATION - $26,000)
     5             (DESIGN AND CONTINGENCIES - $63,000)
     6  SECTION 364.  WAYNE COUNTY.
     7     PROJECTS ARE AS FOLLOWS:
     8         (1)  SR 84, ITS IMPROVEMENTS AND PURCHASES,
     9             I-84 CORRIDOR AND I-380 CORRIDOR,
    10             VARIOUS MUNICIPALITIES                        240,000
    11             (BASE PROJECT ALLOCATION - $200,000)
    12             (DESIGN AND CONTINGENCIES - $40,000)
    13         (2)  I-84, INTERSTATE RESTORATION AND
    14             RECONSTRUCTION                              5,800,000
    15             (BASE PROJECT ALLOCATION - $5,800,000)
    16         (3)  SR 590, INTERSECTION IMPROVEMENT           1,820,000
    17             (BASE PROJECT ALLOCATION - $1,560,000)
    18             (DESIGN AND CONTINGENCIES - $260,000)
    19         (4)  SR 1023, RESTORATION, ROADWAY AND
    20             SLOPE REPAIR                                  650,000
    21             (BASE PROJECT ALLOCATION - $600,000)
    22             (LAND ALLOCATION - $50,000)
    23  SECTION 365.  WESTMORELAND COUNTY.
    24     PROJECTS ARE AS FOLLOWS:
    25         (1)  SR 1045, ENVIRONMENTAL MITIGATION, SR
    26             1045, STREAM MITIGATION, UNITY
    27             TOWNSHIP                                      300,000
    28             (BASE PROJECT ALLOCATION - $300,000)
    29         (2)  SR 130, INTERSECTION IMPROVEMENT, SR
    30             130 AND COLLEGE AVENUE, HEMPFIELD
    20080S1504B2377                 - 120 -    

     1             TOWNSHIP AND CITY OF JEANNETTE                125,000
     2             (BASE PROJECT ALLOCATION - $125,000)
     3         (3)  SR 30, HIGHWAY RESTORATION, SR 30 FROM
     4             THEATER STREET TO PA 217, DERRY AND
     5             UNITY TOWNSHIPS                             3,500,000
     6             (BASE PROJECT ALLOCATION - $3,500,000)
     7         (4)  SR 30, HIGHWAY RESTORATION, US 30
     8             BETTERMENT, HEMPFIELD TOWNSHIP              6,200,000
     9             (BASE PROJECT ALLOCATION - $6,200,000)
    10         (5)  SR 30, WIDEN TO PROVIDE CENTER AND
    11             LEFT TURNING LANE AND ADD SIGNALS, SR
    12             30 CORRIDOR FROM IRWIN BRIDGE TO LOWER
    13             CIRCLEVILLE, IRWIN BOROUGH AND NORTH
    14             HUNTINGDON TOWNSHIP                           800,000
    15             (BASE PROJECT ALLOCATION - $600,000)
    16             (LAND ALLOCATION - $120,000)
    17             (DESIGN AND CONTINGENCIES - $80,000)
    18         (6)  SR 30, HIGHWAY RESTORATION, SR 30 FROM
    19             ROBBINS STATION ROAD TO CENTRAL AVENUE,
    20             IRWIN BOROUGH, NORTH HUNTINGDON
    21             TOWNSHIP                                    2,800,000
    22             (BASE PROJECT ALLOCATION - $2,800,000)
    23         (7)  SR 30, WIDEN, ADD LANE, SR 30,
    24             ALLEGHENY COUNTY LINE TO LEGER ROAD, SR
    25             4019, NORTH HUNTINGDON TOWNSHIP               920,000
    26             (BASE PROJECT ALLOCATION - $700,000)
    27             (LAND ALLOCATION - $160,000)
    28             (DESIGN AND CONTINGENCIES - $60,000)
    29         (8)  SR 30, WIDEN TO PROVIDE CENTER AND
    30             LEFT TURNING LANE AND ADD SIGNALS WHERE
    20080S1504B2377                 - 121 -    

     1             WARRANTED, ADD LANE, SR 30 FROM SR 4019
     2             TO MALTS LANE, NORTH HUNTINGDON
     3             TOWNSHIP                                      300,000
     4             (BASE PROJECT ALLOCATION - $100,000)
     5             (LAND ALLOCATION - $120,000)
     6             (DESIGN AND CONTINGENCIES - $80,000)
     7         (9)  SR 780, INTERSECTION IMPROVEMENT, NEW
     8             TRAFFIC SIGNAL, PA 780 AND PA 380
     9             INTERSECTION, WASHINGTON TOWNSHIP             315,000
    10             (BASE PROJECT ALLOCATION - $240,000)
    11             (DESIGN AND CONTINGENCIES - $75,000)
    12         (10)  I-70, INTERSTATE RESTORATION AND
    13             RECONSTRUCTION                             16,600,000
    14             (BASE PROJECT ALLOCATION - $16,600,000)
    15         (11)  PA 66, INTERSECTION IMPROVEMENT,
    16             SIGNAL IMPROVEMENTS AND ADD LANE            2,463,000
    17             (BASE PROJECT ALLOCATION - $1,839,000)
    18             (LAND ALLOCATION - $260,000)
    19             (DESIGN AND CONTINGENCIES - $364,000)
    20         (12)  SR 51, INTERSECTION IMPROVEMENT, ADD
    21             LEFT TURNING LANES                          3,823,000
    22             (BASE PROJECT ALLOCATION - $2,813,000)
    23             (LAND ALLOCATION - $306,000)
    24             (DESIGN AND CONTINGENCIES - $704,000)
    25  SECTION 366.  WYOMING COUNTY.
    26     PROJECTS ARE AS FOLLOWS:
    27         (1)  US 6, ITS IMPROVEMENTS AND PURCHASES,
    28             US 6 CORRIDOR, VARIOUS MUNICIPALITIES         120,000
    29             (BASE PROJECT ALLOCATION - $100,000)
    30             (DESIGN AND CONTINGENCIES - $20,000)
    20080S1504B2377                 - 122 -    

     1         (2)  SR 4015, HIGHWAY RESTORATION, SLIDE
     2             REPAIR                                        117,000
     3             (LAND ALLOCATION - $117,000)
     4         (3)  SR 2007, RESTORATION, ROADWAY AND
     5             SLOPE REPAIR                                  409,000
     6             (BASE PROJECT ALLOCATION - $409,000)
     7         (4)  SR 4001, RESTORATION, ROADWAY AND
     8             SLOPE REPAIR                                  288,000
     9             (BASE PROJECT ALLOCATION - $288,000)
    10  SECTION 367.  YORK COUNTY.
    11     PROJECTS ARE AS FOLLOWS:
    12         (1)  SR 30, HIGHWAY RESTORATION, CONCRETE
    13             REHABILITATION, US 30, PAVEMENT
    14             GRINDING FROM PA 74 TO I-83, MANCHESTER
    15             AND WEST MANCHESTER TOWNSHIPS AND CITY
    16             OF YORK                                     2,995,000
    17             (BASE PROJECT ALLOCATION - $2,920,000)
    18             (DESIGN AND CONTINGENCIES - $75,000)
    19         (2)  SR 83, INTERCHANGE IMPROVEMENT, I-83,
    20             EXIT 19 AND PA 462 INTERCHANGE,
    21             SPRINGETTSBURY TOWNSHIP                       100,000
    22             (DESIGN AND CONTINGENCIES - $100,000)
    23         (3)  I-83, INTERSTATE RESTORATION AND
    24             RECONSTRUCTION                             39,000,000
    25             (BASE PROJECT ALLOCATION - $39,000,000)
    26         (4)  PA 124, SAFETY IMPROVEMENT, WIDEN          1,374,000
    27             (BASE PROJECT ALLOCATION - $1,374,000)
    28         (5)  PA 124, SAFETY IMPROVEMENT, SHOULDER
    29             IMPROVEMENT AND REDUCE S CURVE                365,000
    30             (BASE PROJECT ALLOCATION - $323,000)
    20080S1504B2377                 - 123 -    

     1             (DESIGN AND CONTINGENCIES - $42,000)
     2         (6)  PA 24, SAFETY IMPROVEMENT, WIDEN AND
     3             ADD LANES                                   5,805,000
     4             (BASE PROJECT ALLOCATION - $969,000)
     5             (LAND ALLOCATION - $74,000)
     6             (DESIGN AND CONTINGENCIES - $4,762,000)
     7         (7)  SR 74, CORRIDOR SAFETY IMPROVEMENT,
     8             WIDEN AND OVERLAY, ADD CENTER TURN
     9             LANE                                           86,000
    10             (BASE PROJECT ALLOCATION - $86,000)
    11         (8)  SR 83, INTERCHANGE IMPROVEMENT,
    12             LENGTHEN RAMPS                                200,000
    13             (LAND ALLOCATION - $200,000)
    14  SECTION 368.  STATEWIDE PROJECTS.
    15     PROJECTS ARE AS FOLLOWS:
    16         (1)  VARIOUS ROUTES, CAPITALIZATION OF
    17             PENNSYLVANIA INFRASTRUCTURE BANK,
    18             VARIOUS PROJECTS, STATEWIDE                90,000,000
    19             (BASE PROJECT ALLOCATION - $90,000,000)
    20         (2)  VARIOUS ROUTES, INTERSECTION OF ALL
    21             STATE ROUTES WITH OTHER STATE ROUTES,
    22             INSTALL OR REPLACE CURB CUT RAMPS AS
    23             REQUIRED BY THE AMERICANS WITH
    24             DISABILITIES ACT, VARIOUS PROJECTS,
    25             STATEWIDE                                 400,000,000
    26             (BASE PROJECT ALLOCATION -
    27             $400,000,000)
    28                             CHAPTER 5
    29                             (RESERVED)
    30                             CHAPTER 7
    20080S1504B2377                 - 124 -    

     1                      MISCELLANEOUS PROVISIONS
     2  SECTION 701.  FEDERAL FUNDS.
     3     ALL MONEYS RECEIVED FROM THE FEDERAL GOVERNMENT FOR THE
     4  CONSTRUCTION OF THE PROJECTS SPECIFICALLY ITEMIZED IN THIS ACT
     5  ARE ALSO HEREBY APPROPRIATED FOR THOSE PROJECTS.
     6  SECTION 702.  ALLOCATION OF FUNDS.
     7     WHENEVER AS DETERMINED BY THE DEPARTMENT OF TRANSPORTATION
     8  THAT THE FULL ESTIMATED FINANCIAL COSTS OF THE PROJECTS ITEMIZED
     9  IN THIS ACT ARE NOT NECESSARY FOR THE PROPER DESIGN, ACQUISITION
    10  OR CONSTRUCTION OF SUCH PROJECTS, THE EXCESS FUNDS NO LONGER
    11  REQUIRED MAY BE ALLOCATED BY THE DEPARTMENT OF TRANSPORTATION TO
    12  INCREASE THE ESTIMATED COSTS OF ANY ONE OR MORE OF THE PROJECTS
    13  SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET.
    14  SECTION 703.  ESTIMATED USEFUL LIFE.
    15     THE GENERAL ASSEMBLY STATES THAT THE ESTIMATED USEFUL LIFE OF
    16  THE HIGHWAY CAPITAL PROJECTS ITEMIZED IN THIS ACT IS 30 YEARS.
    17  SECTION 704.  EFFECTIVE DATE.
    18     THIS ACT SHALL TAKE EFFECT IMMEDIATELY.








    F17L86RLE/20080S1504B2377       - 125 -