PRIOR PRINTER'S NO. 2219 PRINTER'S NO. 2377
No. 1504 Session of 2008
INTRODUCED BY STOUT AND MADIGAN, JUNE 19, 2008
SENATOR ARMSTRONG, APPROPRIATIONS, RE-REPORTED AS AMENDED, SEPTEMBER 17, 2008
AN ACT 1 Providing for the highway capital budget project itemization for <-- 2 the fiscal year 2008-2009. 3 PROVIDING FOR THE HIGHWAY CAPITAL BUDGET PROJECT ITEMIZATION FOR <-- 4 THE FISCAL YEAR 2008-2009. 5 The General Assembly of the Commonwealth of Pennsylvania 6 hereby enacts as follows: 7 CHAPTER 1 <-- 8 GENERAL PROVISIONS 9 Section 101. Short title. 10 This act shall be known and may be cited as the Highway 11 Capital Budget Project Itemization Act of 2008-2009. 12 Section 102. Total authorization. 13 The total authorization for the capital projects itemized in 14 Chapter 3 and to be constructed by the Department of 15 Transportation, its successors or assigns and to be financed 16 from current revenues of the Motor License Fund shall be 17 $0,000,000,000. 18 Section 103. Itemization of public highway projects.
1 Additional capital projects in the category of public highway 2 projects to be constructed by the Department of Transportation, 3 its successors or assigns and to be financed from current 4 revenues of the Motor License Fund are itemized in Chapter 3, 5 together with their respective estimated financial costs. 6 CHAPTER 3 7 ITEMIZED PROJECTS 8 Total 9 Project 10 Project Allocation 11 Section 301. Adams County (Reserved). 12 Projects are as follows: 13 Section 302. Allegheny County. 14 Projects are as follows: 15 (1) I-279, ITS Expansion, Corridor Safety 16 Improvement, I-279 from Camp Home Road 17 to I-79, Ross Township, Franklin Park 18 Borough 763,000 19 (Base Project Allocation - $763,000) 20 Section 303. Armstrong County (Reserved). 21 Section 304. Beaver County (Reserved). 22 Section 305. Bedford County (Reserved). 23 Section 306. Berks County (Reserved). 24 Section 307. Blair County (Reserved). 25 Section 308. Bradford County (Reserved). 26 Section 309. Bucks County (Reserved). 27 Section 310. Butler County (Reserved). 28 Section 311. Cambria County (Reserved). 29 Section 312. Cameron County (Reserved). 30 Section 313. Carbon County (Reserved). 20080S1504B2377 - 2 -
1 Section 314. Centre County (Reserved). 2 Section 315. Chester County (Reserved). 3 Section 316. Clarion County (Reserved). 4 Section 317. Clearfield County (Reserved). 5 Section 318. Clinton County (Reserved). 6 Section 319. Columbia County (Reserved). 7 Section 320. Crawford County (Reserved). 8 Section 321. Cumberland County (Reserved). 9 Section 322. Dauphin County (Reserved). 10 Section 323. Delaware County (Reserved). 11 Section 324. Elk County (Reserved). 12 Section 325. Erie County (Reserved). 13 Section 326. Fayette County (Reserved). 14 Section 327. Forest County (Reserved). 15 Section 328. Franklin County (Reserved). 16 Section 329. Fulton County (Reserved). 17 Section 330. Greene County (Reserved). 18 Section 331. Huntingdon County (Reserved). 19 Section 332. Indiana County (Reserved). 20 Section 333. Jefferson County (Reserved). 21 Section 334. Juniata County (Reserved). 22 Section 335. Lackawanna County (Reserved). 23 Section 336. Lancaster County (Reserved). 24 Section 337. Lawrence County (Reserved). 25 Section 338. Lebanon County (Reserved). 26 Section 339. Lehigh County (Reserved). 27 Section 340. Luzerne County (Reserved). 28 Section 341. Lycoming County (Reserved). 29 Section 342. McKean County (Reserved). 30 Section 343. Mercer County (Reserved). 20080S1504B2377 - 3 -
1 Section 344. Mifflin County (Reserved). 2 Section 345. Monroe County (Reserved). 3 Section 346. Montgomery County (Reserved). 4 Section 347. Montour County (Reserved). 5 Section 348. Northampton County (Reserved). 6 Section 349. Northumberland County (Reserved). 7 Section 350. Perry County (Reserved). 8 Section 351. Philadelphia County (Reserved). 9 Section 352. Pike County (Reserved). 10 Section 353. Potter County (Reserved). 11 Section 354. Schuylkill County (Reserved). 12 Section 355. Snyder County (Reserved). 13 Section 356. Somerset County (Reserved). 14 Section 357. Sullivan County (Reserved). 15 Section 358. Susquehanna County (Reserved). 16 Section 359. Tioga County (Reserved). 17 Section 360. Union County (Reserved). 18 Section 361. Venango County (Reserved). 19 Section 362. Warren County (Reserved). 20 Section 363. Washington County (Reserved). 21 Section 364. Wayne County (Reserved). 22 Section 365. Westmoreland County (Reserved). 23 Section 366. Wyoming County (Reserved). 24 Section 367. York County (Reserved). 25 Section 368. Statewide projects (Reserved). 26 CHAPTER 5 27 (RESERVED) 28 CHAPTER 7 29 MISCELLANEOUS PROVISIONS 30 Section 701. Federal funds. 20080S1504B2377 - 4 -
1 All moneys received from the Federal Government for the 2 construction of the projects specifically itemized in this act 3 are also hereby appropriated for those projects. 4 Section 702. Allocation of funds. 5 Whenever as determined by the Department of Transportation 6 that the full estimated financial costs of the projects itemized 7 in this act are not necessary for the proper design, acquisition 8 or construction of such projects, the excess funds no longer 9 required may be allocated by the Department of Transportation to 10 increase the estimated costs of any one or more of the projects 11 specifically itemized in a capital budget. 12 Section 703. Estimated useful life. 13 The General Assembly states that the estimated useful life of 14 the highway capital projects itemized in this act is 30 years. 15 Section 704. Effective date. 16 This act shall take effect immediately. 17 CHAPTER 1 <-- 18 GENERAL PROVISIONS 19 SECTION 101. SHORT TITLE. 20 THIS ACT SHALL BE KNOWN AND MAY BE CITED AS THE HIGHWAY 21 CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2008-2009. 22 SECTION 102. TOTAL AUTHORIZATION. 23 THE TOTAL AUTHORIZATION FOR THE CAPITAL PROJECTS ITEMIZED IN 24 CHAPTER 3 AND TO BE CONSTRUCTED BY THE DEPARTMENT OF 25 TRANSPORTATION, ITS SUCCESSORS OR ASSIGNS AND TO BE FINANCED 26 FROM CURRENT REVENUES OF THE MOTOR LICENSE FUND SHALL BE 27 $3,361,513,000. 28 SECTION 103. ITEMIZATION OF PUBLIC HIGHWAY PROJECTS. 29 ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC HIGHWAY 30 PROJECTS TO BE CONSTRUCTED BY THE DEPARTMENT OF TRANSPORTATION, 20080S1504B2377 - 5 -
1 ITS SUCCESSORS OR ASSIGNS AND TO BE FINANCED FROM CURRENT 2 REVENUES OF THE MOTOR LICENSE FUND ARE ITEMIZED IN CHAPTER 3, 3 TOGETHER WITH THEIR RESPECTIVE ESTIMATED FINANCIAL COSTS. 4 CHAPTER 3 5 ITEMIZED PROJECTS 6 TOTAL 7 PROJECT 8 PROJECT ALLOCATION 9 SECTION 301. ADAMS COUNTY. 10 PROJECTS ARE AS FOLLOWS: 11 (1) PA 94, RECONSTRUCT, ADD LANE, WIDEN 1,367,000 12 (BASE PROJECT ALLOCATION - $,1,367,000) 13 SECTION 302. ALLEGHENY COUNTY. 14 PROJECTS ARE AS FOLLOWS: 15 (1) I-279, ITS EXPANSION, CORRIDOR SAFETY 16 IMPROVEMENT, I-279 FROM CAMP HORNE ROAD 17 TO I-79, FRANKLIN PARK BOROUGH AND ROSS 18 TOWNSHIP 763,000 19 (BASE PROJECT ALLOCATION - $763,000) 20 (2) SR 1001, CONCRETE PAVEMENT 21 RECONSTRUCTION, REHABILITATION, SR 22 1001, FREEPORT ROAD NO.2 FROM ROSS 23 STREET TO BURTNER ROAD, BRACKENRIDGE 24 AND TARENTUM BOROUGHS AND HARRISON 25 TOWNSHIP 4,778,000 26 (BASE PROJECT ALLOCATION - $4,328,000) 27 (DESIGN AND CONTINGENCIES - $450,000) 28 (3) SR 1001, CONCRETE PAVEMENT 29 RECONSTRUCTION, REHABILITATION, SR 30 1001, FREEPORT ROAD NO.3 FROM BURTNER 20080S1504B2377 - 6 -
1 ROAD TO BRACKENRIDGE BOROUGH LINE, 2 BRACKENRIDGE BOROUGH AND HARRISON 3 TOWNSHIP 3,875,000 4 (BASE PROJECT ALLOCATION - $3,520,000) 5 (DESIGN AND CONTINGENCIES - $355,000) 6 (4) SR 1001, CONCRETE PAVEMENT 7 RECONSTRUCTION, REHABILITATION, SR 8 1001, FREEPORT ROAD NO.1 FROM BAILEYS 9 RUN TO NORTH OF LARUSSE BOULEVARD, EAST 10 DEER AND TARENTUM TOWNSHIPS 1,162,000 11 (BASE PROJECT ALLOCATION - $1,056,000) 12 (DESIGN AND CONTINGENCIES - $106,000) 13 (5) SR 1001, CONCRETE PAVEMENT 14 RECONSTRUCTION, REHABILITATION, SR 15 1001, ETNA BYPASS, ETNA BOROUGH 696,000 16 (BASE PROJECT ALLOCATION - $632,000) 17 (DESIGN AND CONTINGENCIES - $64,000) 18 (6) SR 1013, CONCRETE PAVEMENT 19 RECONSTRUCTION, REHABILITATION, SR 20 1013, SAXONBURG BOULEVARD, INDIANA AND 21 WEST DEER TOWNSHIPS 3,054,000 22 (BASE PROJECT ALLOCATION - $2,774,000) 23 (DESIGN AND CONTINGENCIES - $280,000) 24 (7) SR 130, SAFETY IMPROVEMENT, ALLEGHENY 25 RIVER BOULEVARD FROM PENN HILLS TO 26 VERONA, PENN HILLS TOWNSHIP AND CITY OF 27 PITTSBURGH 588,000 28 (BASE PROJECT ALLOCATION - $553,000) 29 (DESIGN AND CONTINGENCIES - $35,000) 30 (8) SR 148, CONCRETE PAVEMENT 20080S1504B2377 - 7 -
1 RECONSTRUCTION, REHABILITATION, SR 148 2 FROM EDEN PARK BOULEVARD TO LINCOLN 3 HIGHWAY, CITY OF MCKEESPORT AND NORTH 4 VERSAILLES TOWNSHIP 3,080,000 5 (BASE PROJECT ALLOCATION - $2,800,000) 6 (DESIGN AND CONTINGENCIES - $280,000) 7 (9) SR 19, CONCRETE PAVEMENT 8 RECONSTRUCTION, REHABILITATION, PERRY 9 HIGHWAY, WESTBOUND FROM PINE CREEK ROAD 10 TO SOUTH CHURCH ROAD, MCCANDLESS AND 11 PINE TOWNSHIPS 2,221,000 12 (BASE PROJECT ALLOCATION - $2,016,000) 13 (DESIGN AND CONTINGENCIES - $205,000) 14 (10) SR 19, CONCRETE PAVEMENT 15 RECONSTRUCTION, REHABILITATION, PERRY 16 HIGHWAY, EASTBOUND FROM PINE CREEK ROAD 17 TO SOUTH CHURCH ROAD, MCCANDLESS AND 18 PINE TOWNSHIPS 2,221,000 19 (BASE PROJECT ALLOCATION - $2,016,000) 20 (DESIGN AND CONTINGENCIES - $205,000) 21 (11) SR 19, CONCRETE PAVEMENT 22 RECONSTRUCTION, REHABILITATION, 23 WASHINGTON ROAD, EASTBOUND FROM 24 GILKESON ROAD TO COCHRAN ROAD, MT. 25 LEBANON TOWNSHIP 1,206,000 26 (BASE PROJECT ALLOCATION - $1,096,000) 27 (DESIGN AND CONTINGENCIES - $110,000) 28 (12) SR 19, CONCRETE PAVEMENT 29 RECONSTRUCTION, REHABILITATION, 30 WASHINGTON ROAD, WESTBOUND FROM 20080S1504B2377 - 8 -
1 GILKESON ROAD TO COCHRAN ROAD, MT. 2 LEBANON TOWNSHIP 898,000 3 (BASE PROJECT ALLOCATION - $816,000) 4 (DESIGN AND CONTINGENCIES - $82,000) 5 (13) SR 19, UPGRADE AND REBUILD TEN 6 SIGNALS, SAFETY IMPROVEMENT, PERRY 7 HIGHWAY FROM IVORY TO SEWICKLEY OAKMONT 8 ROAD, WEST VIEW BOROUGH, PINE AND ROSS 9 TOWNSHIPS AND CITY OF PITTSBURGH 50,000 10 (DESIGN AND CONTINGENCIES - $50,000) 11 (14) SR 19, CONCRETE PAVEMENT 12 RECONSTRUCTION, REHABILITATION, SR 19, 13 BOYCE ROAD, UPPER ST. CLAIR TOWNSHIP 1,098,000 14 (BASE PROJECT ALLOCATION - $998,000) 15 (DESIGN AND CONTINGENCIES - $100,000) 16 (15) SR 19, CONCRETE PAVEMENT 17 RECONSTRUCTION, REHABILITATION, 18 PERRYSVILLE AVENUE FROM BELLEVUE ROAD 19 TO HARDEN DRIVE, WEST VIEW BOROUGH 1,259,000 20 (BASE PROJECT ALLOCATION - $1,144,000) 21 (DESIGN AND CONTINGENCIES - $115,000) 22 (16) SR 2048, RESTORATION, REHABILITATION, 23 SAFETY IMPROVEMENTS, BUSINESS ROUTE 22 24 FROM RODI ROAD, SR 791 TO MOSSIDE 25 BOULEVARD, SR 48, CHURCHILL AND 26 MONROEVILLE BOROUGHS AND WILKINS 27 TOWNSHIP 1,998,000 28 (BASE PROJECT ALLOCATION - $1,974,000) 29 (DESIGN AND CONTINGENCIES - $24,000) 30 (17) SR 2057, CONCRETE PAVEMENT 20080S1504B2377 - 9 -
1 RECONSTRUCTION, REHABILITATION, SR 2 2057, HAYMAKER ROAD, MONROEVILLE 3 BOROUGH 407,000 4 (BASE PROJECT ALLOCATION - $370,000) 5 (DESIGN AND CONTINGENCIES - $37,000) 6 (18) SR 2058, PAVEMENT RECONSTRUCTION, 7 REHABILITATION, SR 2058, LEECHBURG 8 ROAD, PENN HILLS TOWNSHIP 966,000 9 (BASE PROJECT ALLOCATION - $878,000) 10 (DESIGN AND CONTINGENCIES - $88,000) 11 (19) SR 2073, CONCRETE PAVEMENT 12 RECONSTRUCTION, REHABILITATION, 13 ALLEGHENY RIVER BOULEVARD FROM SANDY 14 CREEK TO COLLEGE, VERONA AND OAKMONT 15 BOROUGHS AND PENN HILLS TOWNSHIP 805,000 16 (BASE PROJECT ALLOCATION - $731,000) 17 (DESIGN AND CONTINGENCIES - $74,000) 18 (20) SR 2073, CONCRETE PAVEMENT 19 RECONSTRUCTION, REHABILITATION, SR 2073 20 FROM SOUTH AVENUE TO PLUM STREET, 21 VERONA BOROUGH 330,000 22 (BASE PROJECT ALLOCATION - $300,000) 23 (DESIGN AND CONTINGENCIES - $30,000) 24 (21) SR 2104, CONCRETE PAVEMENT 25 RECONSTRUCTION, REHABILITATION, SR 26 2104, CHURCHILL ROAD, CHURCHILL 27 BOROUGH 410,000 28 (BASE PROJECT ALLOCATION - $372,000) 29 (DESIGN AND CONTINGENCIES - $38,000) 30 (22) SR 2108, CONCRETE PAVEMENT 20080S1504B2377 - 10 -
1 RECONSTRUCTION, REHABILITATION, SR 2 2108, WILKINS AVENUE, CITY OF 3 PITTSBURGH 363,000 4 (BASE PROJECT ALLOCATION - $330,000) 5 (DESIGN AND CONTINGENCIES - $33,000) 6 (23) SR 2116, CONCRETE PAVEMENT 7 RECONSTRUCTION, REHABILITATION, SR 8 2116, BETTIS ROAD, DRAVOSBURG AND WEST 9 MIFFLIN BOROUGHS 429,000 10 (BASE PROJECT ALLOCATION - $390,000) 11 (DESIGN AND CONTINGENCIES - $39,000) 12 (24) SR 2128, CONCRETE PAVEMENT 13 RECONSTRUCTION, REHABILITATION, TENTH 14 STREET BYPASS PHASE II, SR 8041 TO FORT 15 DUQUESNE BOULEVARD, CITY OF PITTSBURGH 616,000 16 (BASE PROJECT ALLOCATION - $560,000) 17 (DESIGN AND CONTINGENCIES - $56,000) 18 (25) SR 2128, CONCRETE PAVEMENT 19 RECONSTRUCTION, REHABILITATION, SR 20 3004, MCMURRAY ROAD, CITY OF 21 PITTSBURGH 623,000 22 (BASE PROJECT ALLOCATION - $566,000) 23 (DESIGN AND CONTINGENCIES - $57,000) 24 (26) SR 2128, CONCRETE PAVEMENT 25 RECONSTRUCTION, REHABILITATION, TENTH 26 STREET BYPASS PHASE I, SR 8041 TO FORT 27 DUQUESNE BOULEVARD, CITY OF PITTSBURGH 616,000 28 (BASE PROJECT ALLOCATION - $560,000) 29 (DESIGN AND CONTINGENCIES - $56,000) 30 (27) SR 279, CONCRETE PAVEMENT 20080S1504B2377 - 11 -
1 RECONSTRUCTION, REHABILITATION, SR 279, 2 ROBINSON TOWNSHIP TO FORT PITT TUNNEL, 3 CARNEGIE, GREEN TREE AND ROSSLYN FARMS 4 BOROUGHS, COLLIER, SCOTT AND ROBINSON 5 TOWNSHIPS AND CITY OF PITTSBURGH 2,860,000 6 (BASE PROJECT ALLOCATION - $2,600,000) 7 (DESIGN AND CONTINGENCIES - $260,000) 8 (28) SR 28, CONCRETE PAVEMENT 9 RECONSTRUCTION, REHABILITATION, SR 28, 10 NORTHBOUND FROM BAILY'S RUN TO COUNTY 11 LINE, EAST DEER AND HARRISON TOWNSHIPS 13,750,000 12 (BASE PROJECT ALLOCATION - $12,500,000) 13 (DESIGN AND CONTINGENCIES - $1,250,000) 14 (29) SR 28, CONCRETE PAVEMENT 15 RECONSTRUCTION, REHABILITATION, SR 28 16 SOUTHBOUND FROM BAILY'S RUN TO COUNTY 17 LINE, EAST DEER AND HARRISON TOWNSHIPS 13,750,000 18 (BASE PROJECT ALLOCATION - $12,500,000) 19 (DESIGN AND CONTINGENCIES - $1,250,000) 20 (30) SR 28, CONCRETE PAVEMENT 21 RECONSTRUCTION, REHABILITATION, SR 28 22 FROM MILVALE TO ETNA, ETNA BOROUGH AND 23 SHALER TOWNSHIP 3,850,000 24 (BASE PROJECT ALLOCATION - $3,500,000) 25 (DESIGN AND CONTINGENCIES - $350,000) 26 (31) SR 30, CONCRETE PAVEMENT 27 RECONSTRUCTION, REHABILITATION, SR 30 28 FROM COUNTY LINE TO CLINTON ROAD, 29 FINDLAY TOWNSHIP 1,650,000 30 (BASE PROJECT ALLOCATION - $1,500,000) 20080S1504B2377 - 12 -
1 (DESIGN AND CONTINGENCIES - $150,000) 2 (32) SR 3005, CONCRETE PAVEMENT 3 RECONSTRUCTION, REHABILITATION, SR 4 3005, STATION STREET TO BANK STREET, 5 BRIDGEVILLE BOROUGH 421,000 6 (BASE PROJECT ALLOCATION - $381,000) 7 (DESIGN AND CONTINGENCIES - $40,000) 8 (33) SR 3009, CONCRETE PAVEMENT 9 RECONSTRUCTION, REHABILITATION, SR 10 3009, BAPTIST ROAD, BETHEL PARK AND 11 WHITEHALL BOROUGHS 1,130,000 12 (BASE PROJECT ALLOCATION - $1,027,000) 13 (DESIGN AND CONTINGENCIES - $103,000) 14 (34) SR 3009, CONCRETE PAVEMENT 15 RECONSTRUCTION, REHABILITATION, SR 16 3009, SOUTH PARK ROAD, BETHEL PARK 17 BOROUGH 469,000 18 (BASE PROJECT ALLOCATION - $426,000) 19 (DESIGN AND CONTINGENCIES - $43,000) 20 (35) SR 3028, SLIDE CORRECTION, CONCRETE 21 PAVEMENT RECONSTRUCTION, 22 REHABILITATION, SR 3028, AT PRESTO AND 23 SYGAN ROADS, SOUTH FAYETTE TOWNSHIP 1,100,000 24 (BASE PROJECT ALLOCATION - $1,000,000) 25 (DESIGN AND CONTINGENCIES - $100,000) 26 (36) SR 3038, SAFETY IMPROVEMENT, CONNER 27 ROAD FROM WASHINGTON ROAD TO LIBRARY 28 ROAD, BETHEL PARK BOROUGH AND MT. 29 LEBANON TOWNSHIP 354,000 30 (BASE PROJECT ALLOCATION - $304,000) 20080S1504B2377 - 13 -
1 (DESIGN AND CONTINGENCIES - $50,000) 2 (37) SR 3044, CONCRETE PAVEMENT 3 RECONSTRUCTION, REHABILITATION, CASTLE 4 SHANNON BOULEVARD FROM WASHINGTON ROAD 5 TO SCOTT ROAD, MT. LEBANON TOWNSHIP 1,100,000 6 (BASE PROJECT ALLOCATION - $1,000,000) 7 (DESIGN AND CONTINGENCIES - $100,000) 8 (38) SR 3054, SLIDE CORRECTION, CONCRETE 9 PAVEMENT RECONSTRUCTION, 10 REHABILITATION, SR 3054, SEGMENT 0020 11 AND SEGMENT 0030, COLLIER TOWNSHIP 1,100,000 12 (BASE PROJECT ALLOCATION - $1,000,000) 13 (DESIGN AND CONTINGENCIES - $100,000) 14 (39) SR 3065, NEW TWO-LANE ROADWAY, 15 BANKSVILLE CONNECTION TO WABASH TUNNEL 16 TO BANKSVILLE ROAD IN CITY OF 17 PITTSBURGH, GREEN TREE BOROUGH 14,620,000 18 (BASE PROJECT ALLOCATION - $10,000,000) 19 (LAND ALLOCATION - $2,000,000) 20 (DESIGN AND CONTINGENCIES - $2,620,000) 21 (40) SR 3069, CONCRETE PAVEMENT 22 RECONSTRUCTION, REHABILITATION, SR 3069 23 FROM LIBERTY BRIDGE TO 6TH AVENUE, CITY 24 OF PITTSBURGH 1,650,000 25 (BASE PROJECT ALLOCATION - $1,500,000) 26 (DESIGN AND CONTINGENCIES - $150,000) 27 (41) SR 3069, CONCRETE PAVEMENT 28 RECONSTRUCTION, REHABILITATION, WEST 29 LIBERTY AVENUE FROM MCFARLAND TO SAW 30 MILL RUN, DORMONT BOROUGH AND CITY OF 20080S1504B2377 - 14 -
1 PITTSBURGH 2,139,000 2 (BASE PROJECT ALLOCATION - $1,944,000) 3 (DESIGN AND CONTINGENCIES - $195,000) 4 (42) SR 3085, CONCRETE PAVEMENT 5 RECONSTRUCTION, REHABILITATION, SR 6 3085, FOREST GROVE ROAD, ROBINSON 7 TOWNSHIP 590,000 8 (BASE PROJECT ALLOCATION - $536,000) 9 (DESIGN AND CONTINGENCIES - $54,000) 10 (43) SR 3087, CONCRETE PAVEMENT 11 RECONSTRUCTION, REHABILITATION, SR 12 3087, THORN RUN ROAD, MOON TOWNSHIP 752,000 13 (BASE PROJECT ALLOCATION - $683,000) 14 (DESIGN AND CONTINGENCIES - $69,000) 15 (44) SR 3092, CONCRETE PAVEMENT 16 RECONSTRUCTION, REHABILITATION, SR 17 3092, BROADWAY STREET, STOWE TOWNSHIP 398,000 18 (BASE PROJECT ALLOCATION - $361,000) 19 (DESIGN AND CONTINGENCIES - $37,000) 20 (45) SR 366, SIGNAL IMPROVEMENTS AT 4 21 INTERSECTIONS, SR 8 AND SR 366, 2 22 INTERSECTIONS EACH, TARENTUM BOROUGH 23 AND SHALER TOWNSHIP 50,000 24 (BASE PROJECT ALLOCATION - $50,000) 25 (46) SR 376, INSTALLATION OF ITS EQUIPMENT 26 TO INCLUDE VARIABLE TRAFFIC SYSTEM, I- 27 376 FROM SOUTH BRADDOCK AVENUE TO SR 28 2048, BUSINESS ROUTE 22, BRADDOCK 29 HILLS, CHURCHILL, EDGEWOOD, WILKINSBURG 30 BOROUGHS AND CITY OF PITTSBURGH 35,000 20080S1504B2377 - 15 -
1 (BASE PROJECT ALLOCATION - $35,000) 2 (47) SR 376, PAVEMENT RECONSTRUCTION, 3 REHABILITATION, SQUIRREL HILL TUNNEL 4 REHABILITATION NO.2, CITY OF 5 PITTSBURGH 4,950,000 6 (BASE PROJECT ALLOCATION - $4,500,000) 7 (DESIGN AND CONTINGENCIES - $450,000) 8 (48) SR 400, CONCRETE PAVEMENT 9 RECONSTRUCTION, REHABILITATION, BIGELOW 10 BOULEVARD, NORTHBOUND CRAIG TO 11 BLOOMFIELD BRIDGE, CITY OF PITTSBURGH 550,000 12 (BASE PROJECT ALLOCATION - $500,000) 13 (DESIGN AND CONTINGENCIES - $50,000) 14 (49) SR 400, CONCRETE PAVEMENT 15 RECONSTRUCTION, REHABILITATION, BIGELOW 16 BOULEVARD, SOUTHBOUND CRAIG TO 17 BLOOMFIELD BRIDGE, CITY OF PITTSBURGH 550,000 18 (BASE PROJECT ALLOCATION - $500,000) 19 (DESIGN AND CONTINGENCIES - $50,000) 20 (50) SR 4003, CONCRETE PAVEMENT 21 RECONSTRUCTION, REHABILITATION, SR 22 4003, MCKNIGHT ROAD PHASE II, ROSS AND 23 MCCANDLESS TOWNSHIPS 6,592,000 24 (BASE PROJECT ALLOCATION - $5,992,000) 25 (DESIGN AND CONTINGENCIES - $600,000) 26 (51) SR 4003, CONCRETE PAVEMENT 27 RECONSTRUCTION, REHABILITATION, SR 28 4003, MCKNIGHT ROAD PHASE I, ROSS AND 29 MCCANDLESS TOWNSHIPS 6,458,000 30 (BASE PROJECT ALLOCATION - $5,858,000) 20080S1504B2377 - 16 -
1 (DESIGN AND CONTINGENCIES - $600,000) 2 (52) SR 4024, CONCRETE PAVEMENT 3 RECONSTRUCTION, REHABILITATION, SR 4 4024, DUNCAN AVENUE, MCCANDLESS 5 TOWNSHIP 836,000 6 (BASE PROJECT ALLOCATION - $760,000) 7 (DESIGN AND CONTINGENCIES - $76,000) 8 (53) SR 4036, CONCRETE PAVEMENT 9 RECONSTRUCTION, REHABILITATION, BIG 10 SEWICKLEY CREEK ROAD FROM SUNSET DRIVE 11 TO HITZELL HILL ROAD, BELL ACRES AND 12 ECONOMY BOROUGHS 1,870,000 13 (BASE PROJECT ALLOCATION - $1,700,000) 14 (DESIGN AND CONTINGENCIES - $170,000) 15 (54) SR 4052, INTERSECTION IMPROVEMENT, 16 WIDEN, WARRENDALE-BAYNE ROAD, 17 IMPROVEMENTS, PHASE II, MARSHALL 18 TOWNSHIP 99,000 19 (BASE PROJECT ALLOCATION - $99,000) 20 (55) SR 4084, CONCRETE PAVEMENT 21 RECONSTRUCTION, REHABILITATION, SR 22 4084, WESTERN AVENUE AND RIDGE FROM 23 CHATEAU STREET TO BRIGHTON ROAD, CITY 24 OF PITTSBURGH 784,000 25 (BASE PROJECT ALLOCATION - $712,000) 26 (DESIGN AND CONTINGENCIES - $72,000) 27 (56) SR 48, CONCRETE PAVEMENT 28 RECONSTRUCTION, REHABILITATION, SR 48, 29 SCENERY DRIVE, FORWARD AND ELIZABETH 30 TOWNSHIPS 715,000 20080S1504B2377 - 17 -
1 (BASE PROJECT ALLOCATION - $650,000) 2 (DESIGN AND CONTINGENCIES - $65,000) 3 (57) SR 48, CONCRETE PAVEMENT 4 RECONSTRUCTION, REHABILITATION, SR 48, 5 T-130 TO MACBETH DRIVE, MONROEVILLE 6 BOROUGH 2,120,000 7 (BASE PROJECT ALLOCATION - $1,920,000) 8 (DESIGN AND CONTINGENCIES - $200,000) 9 (58) SR 50, UPGRADE AND COORDINATE 8 10 SIGNALS, SAFETY IMPROVEMENT, PA 50, 11 COLLIER STREET TO NOBLESTOWN AND 12 POPLAR, CARNEGIE, GREEN TREE AND 13 HEIDELBERG BOROUGHS, SCOTT TOWNSHIP AND 14 CITY OF PITTSBURGH 18,000 15 (DESIGN AND CONTINGENCIES - $18,000) 16 (59) SR 51, TRAFFIC SIGNAL UPGRADE, 9 17 INTERSECTIONS, EXISTING SIGNAL 18 IMPROVEMENT, SAW MILL RUN BOULEVARD 19 FROM EDGEBROOKE AVENUE TO STEWART 20 AVENUE, BRENTWOOD AND WHITEHALL 21 BOROUGHS AND CITY OF PITTSBURGH 232,000 22 (BASE PROJECT ALLOCATION - $232,000) 23 (60) SR 51, CONCRETE PAVEMENT 24 RECONSTRUCTION, REHABILITATION, 25 CLAIRTON BOULEVARD FROM LEWIS RUN TO 26 CLOVERLEAF, PLEASANT HILLS BOROUGH 7,260,000 27 (BASE PROJECT ALLOCATION - $6,600,000) 28 (DESIGN AND CONTINGENCIES - $660,000) 29 (61) SR 60, CONCRETE PAVEMENT 30 RECONSTRUCTION, REHABILITATION, SR 60 20080S1504B2377 - 18 -
1 FROM BUSINESS ROUTE 60 TO SOUTH 2 EXPRESSWAY, FINDLAY AND MOON TOWNSHIPS 10,474,000 3 (BASE PROJECT ALLOCATION - $9,522,000) 4 (DESIGN AND CONTINGENCIES - $952,000) 5 (62) SR 60, NEW INTERCHANGE, DICK'S 6 SPORTING GOODS HEADQUARTERS, BETWEEN SR 7 60 AND BUSINESS ROUTE 60, CLINTON ROAD 8 AND FLAUGHERTY RUN INTERCHANGE, FINDLAY 9 TOWNSHIP 1,868,000 10 (BASE PROJECT ALLOCATION - $1,868,000) 11 (63) SR 60, CONCRETE PAVEMENT 12 RECONSTRUCTION, REHABILITATION, SR 60, 13 SOUTH EXPRESSWAY NO.2, SEGMENT 0353 TO 14 SEGMENT 0392 FROM AIRPORT TO FLAUGHERTY 15 RUN, FINDLAY AND MOON TOWNSHIPS 18,500,000 16 (BASE PROJECT ALLOCATION - $18,500,000) 17 (64) SR 60, CONCRETE PAVEMENT 18 RECONSTRUCTION, REHABILITATION, SR 60, 19 SOUTH EXPRESSWAY NO.1, SEGMENT 0352 TO 20 SEGMENT 0392 FROM AIRPORT TO FLAUGHERTY 21 RUN, FINDLAY AND MOON TOWNSHIPS 18,500,000 22 (BASE PROJECT ALLOCATION - $18,500,000) 23 (65) SR 60, CONCRETE PAVEMENT 24 RECONSTRUCTION, REHABILITATION, SR 60, 25 SOUTH EXPRESSWAY NO.4, SEGMENT 0293 TO 26 SEGMENT 0353 FROM BUSINESS ROUTE 60 TO 27 AIRPORT, MOON TOWNSHIP 20,000,000 28 (BASE PROJECT ALLOCATION - $20,000,000) 29 (66) SR 60, CONCRETE PAVEMENT 30 RECONSTRUCTION, REHABILITATION, SR 60, 20080S1504B2377 - 19 -
1 SOUTH EXPRESSWAY NO.3, SEGMENT 0292 TO 2 SEGMENT 0352 FROM BUSINESS ROUTE 60 TO 3 AIRPORT, MOON TOWNSHIP 20,000,000 4 (BASE PROJECT ALLOCATION - $20,000,000) 5 (67) SR 60, CONCRETE PAVEMENT 6 RECONSTRUCTION, REHABILITATION, 7 STEUBENVILLE PIKE FROM PARKWAY WEST TO 8 I-79, ROBINSON TOWNSHIP 2,750,000 9 (BASE PROJECT ALLOCATION - $2,500,000) 10 (DESIGN AND CONTINGENCIES - $250,000) 11 (68) SR 60, CONCRETE PAVEMENT 12 RECONSTRUCTION, REHABILITATION, SR 60 13 FROM SR 22 TO BUSINESS ROUTE 60, MOON, 14 NORTH FAYETTE AND ROBINSON TOWNSHIPS 1,162,000 15 (BASE PROJECT ALLOCATION - $1,056,000) 16 (DESIGN AND CONTINGENCIES - $106,000) 17 (69) SR 65, UPGRADE AND COORDINATE 17 18 SIGNALS, SAFETY IMPROVEMENT, SR 65 FROM 19 WEST END BRIDGE TO CROSS STREET, 20 VARIOUS MUNICIPALITIES 200,000 21 (BASE PROJECT ALLOCATION - $160,000) 22 (DESIGN AND CONTINGENCIES - $40,000) 23 (70) SR 79, CONCRETE PATCHING RESTORATION, 24 INTERSTATE MAINTENANCE, SR 79 FROM 25 WASHINGTON COUNTY LINE TO BRIDGEVILLE, 26 SEGMENT 496 TO SEGMENT 525, BRIDGEVILLE 27 BOROUGH AND SOUTH FAYETTE TOWNSHIP 1,055,000 28 (BASE PROJECT ALLOCATION - $927,000) 29 (DESIGN AND CONTINGENCIES - $128,000) 30 (71) SR 79, CONCRETE PAVEMENT 20080S1504B2377 - 20 -
1 RECONSTRUCTION, REHABILITATION, SR 79 2 FROM SR 279 TO SR 910, INCLUDING SR 910 3 OVERHEAD DECK REPLACEMENT, FRANKLIN 4 PARK BOROUGH AND MARSHALL TOWNSHIP 2,228,000 5 (BASE PROJECT ALLOCATION - $2,025,000) 6 (DESIGN AND CONTINGENCIES - $203,000) 7 (72) SR 79, CONCRETE PATCHING RESTORATION, 8 INTERSTATE MAINTENANCE, SR 79 FROM 9 CAMPBELLS RUN TO MOON RUN, SEGMENT 586 10 TO SEGMENT 605, KENNEDY AND ROBINSON 11 TOWNSHIPS 885,000 12 (BASE PROJECT ALLOCATION - $800,000) 13 (DESIGN AND CONTINGENCIES - $85,000) 14 (73) SR 79, CONCRETE PATCHING RESTORATION, 15 INTERSTATE MAINTENANCE, SR 79 FROM 16 CAMPBELLS RUN TO MOON RUN, VARIOUS 17 MUNICIPALITIES 97,000 18 (BASE PROJECT ALLOCATION - $97,000) 19 (74) SR 791, CONCRETE PAVEMENT 20 RECONSTRUCTION, REHABILITATION, SR 791, 21 RODI ROAD PHASE I, US 22 TO MAPLE LANE, 22 CHURCHILL BOROUGH 385,000 23 (BASE PROJECT ALLOCATION - $350,000) 24 (DESIGN AND CONTINGENCIES - $35,000) 25 (75) SR 791, CONCRETE PAVEMENT 26 RECONSTRUCTION, REHABILITATION, SR 791, 27 RODI ROAD PHASE II, SEGMENT 0021/0000 28 TO SEGMENT 0021/1656, CHURCHILL 29 BOROUGH 330,000 30 (BASE PROJECT ALLOCATION - $300,000) 20080S1504B2377 - 21 -
1 (DESIGN AND CONTINGENCIES - $30,000) 2 (76) SR 8, CONCRETE PAVEMENT 3 RECONSTRUCTION, REHABILITATION, 4 ALLEGHENY RIVER BOULEVARD, SOUTHBOUND 5 FROM WASHINGTON BOULEVARD TO HIGHLAND 6 PARK BRIDGE, CITY OF PITTSBURGH 330,000 7 (BASE PROJECT ALLOCATION - $300,000) 8 (DESIGN AND CONTINGENCIES - $30,000) 9 (77) SR 8, CONCRETE PAVEMENT 10 RECONSTRUCTION, REHABILITATION, 11 ALLEGHENY RIVER BOULEVARD, NORTHBOUND 12 FROM WASHINGTON BOULEVARD TO HIGHLAND 13 PARK BRIDGE, CITY OF PITTSBURGH 330,000 14 (BASE PROJECT ALLOCATION - $300,000) 15 (DESIGN AND CONTINGENCIES - $30,000) 16 (78) SR 8, CORRIDOR SAFETY IMPROVEMENTS, 17 CONGESTION REDUCTION, PENN AVENUE AND 18 ARDMORE BOULEVARD FROM I-376 TO 19 BRADDOCK AVENUE, HAMPTON, RICHLAND AND 20 SHALER TOWNSHIPS 175,000 21 (BASE PROJECT ALLOCATION - $125,000) 22 (DESIGN AND CONTINGENCIES - $50,000) 23 (79) SR 8, CONCRETE PAVEMENT 24 RECONSTRUCTION, REHABILITATION, PENN 25 AVENUE FROM SOUTH AVENUE TO BRADDOCK 26 AVENUE, WILKINSBURG BOROUGH 447,000 27 (BASE PROJECT ALLOCATION - $406,000) 28 (DESIGN AND CONTINGENCIES - $41,000) 29 (80) SR 837, SLIDE CORRECTION, CONCRETE 30 REHABILITATION, SR 837, SEGMENT 190, 20080S1504B2377 - 22 -
1 DRAVOSBURG AND WEST MIFFLIN BOROUGHS 2,200,000 2 (BASE PROJECT ALLOCATION - $2,000,000) 3 (DESIGN AND CONTINGENCIES - $200,000) 4 (81) SR 88, CONCRETE PAVEMENT 5 RECONSTRUCTION, REHABILITATION, LIBRARY 6 ROAD FROM CASTLE SHANNON BOULEVARD TO 7 SOUTH PARK ROAD, BETHEL PARK AND CASTLE 8 SHANNON BOROUGHS 2,500,000 9 (BASE PROJECT ALLOCATION - $2,272,000) 10 (DESIGN AND CONTINGENCIES - $228,000) 11 (82) SR 88, CONCRETE PAVEMENT 12 RECONSTRUCTION, REHABILITATION, LIBRARY 13 ROAD FROM BROWNSVILLE AND COUNTY LINE 14 TO SOUTH PARK ROAD, BETHEL PARK BOROUGH 15 AND SOUTH PARK TOWNSHIP 3,215,000 16 (BASE PROJECT ALLOCATION - $2,920,000) 17 (DESIGN AND CONTINGENCIES - $295,000) 18 (83) SR 885, CONCRETE PAVEMENT 19 RECONSTRUCTION, REHABILITATION, SR 885 20 FROM STATE STREET TO BEECHWAY, CITY OF 21 CLAIRTON 330,000 22 (BASE PROJECT ALLOCATION - $300,000) 23 (DESIGN AND CONTINGENCIES - $30,000) 24 (84) SR 885, CONCRETE PAVEMENT 25 RECONSTRUCTION, REHABILITATION, SR 885 26 FROM CLAIRTON ROAD TO PAYNE HILL ROAD, 27 JEFFERSON HILLS BOROUGH 517,000 28 (BASE PROJECT ALLOCATION - $470,000) 29 (DESIGN AND CONTINGENCIES - $47,000) 30 (85) SR 910, CONSTRUCT LEFT TURN LANES AND 20080S1504B2377 - 23 -
1 ADJUST TRAFFIC SIGNALS, INTERSECTION 2 IMPROVEMENT, WEXFORD RUN ROAD, LEFT 3 TURN, INTERSECTION OF SR 910 WEXFORD- 4 BAYNE ROAD AND SR 4053 WEXFORD RUN 5 ROAD, MARSHALL TOWNSHIP 70,000 6 (BASE PROJECT ALLOCATION - $64,000) 7 (DESIGN AND CONTINGENCIES - $6,000) 8 (86) SR 910, CONCRETE PAVEMENT 9 RECONSTRUCTION, REHABILITATION, SR 910, 10 WEXFORD-BAYNE ROAD FROM SOUTH CHURCH 11 ROAD TO BABCOCK BOULEVARD, PINE 12 TOWNSHIP 2,669,000 13 (BASE PROJECT ALLOCATION - $2,424,000) 14 (DESIGN AND CONTINGENCIES - $245,000) 15 (87) SR 910, PAVEMENT RECONSTRUCTION, 16 REHABILITATION, SR 910, WEXFORD-BAYNE 17 ROAD FROM MINGO ROAD TO NORTH CHURCH 18 ROAD, PINE TOWNSHIP 1,736,000 19 (BASE PROJECT ALLOCATION - $1,576,000) 20 (DESIGN AND CONTINGENCIES - $160,000) 21 (88) SR 978, PAVEMENT RECONSTRUCTION, 22 REHABILITATION, UNION AVENUE FROM 23 BATTLE RIDGE ROAD TO NOBLESTOWN ROAD, 24 OAKDALE BOROUGH AND SOUTH FAYETTE 25 TOWNSHIP 339,000 26 (BASE PROJECT ALLOCATION - $308,000) 27 (DESIGN AND CONTINGENCIES - $31,000) 28 (89) VARIOUS ROUTES, INSTALLATION OF 29 CENTER LINE RUMBLE STRIPS, RUMBLE 30 STRIPS 2008, VARIOUS MUNICIPALITIES 200,000 20080S1504B2377 - 24 -
1 (BASE PROJECT ALLOCATION - $200,000) 2 (90) I-279, INTERSTATE RESTORATION AND 3 RECONSTRUCTION 19,000,000 4 (BASE PROJECT ALLOCATION - $19,000,000) 5 (91) I-376, INTERSTATE RESTORATION AND 6 RECONSTRUCTION 14,000,000 7 (BASE PROJECT ALLOCATION - $14,000,000) 8 (92) I-576, INTERSTATE RESTORATION AND 9 RECONSTRUCTION 1,200,000 10 (BASE PROJECT ALLOCATION - $1,200,000) 11 (93) I-79, INTERSTATE RESTORATION AND 12 RECONSTRUCTION 27,000,000 13 (BASE PROJECT ALLOCATION - $27,000,000) 14 (94) SR 3009, SAFETY AND INTERSECTION 15 IMPROVEMENTS - SIGNALS UPDATES, 16 WIDENING, TURNING LANES 775,000 17 (BASE PROJECT ALLOCATION - $775,000) 18 (95) SR 28, PREP WORK, SAFETY IMPROVEMENT, 19 DIVIDED RELOCATION, MEDIAN BARRIER, 20 PLANNING, WIDEN, ALTERNATIVE ROUTE 21 IMPROVEMENTS AND ITS SYSTEMS 832,000 22 (BASE PROJECT ALLOCATION - $832,000) 23 (96) SR 4003, CORRIDOR SAFETY IMPROVEMENT 24 UPGRADE AND COORDINATE TRAFFIC SIGNALS 25 AT FOUR LOCATIONS 3,000 26 (DESIGN AND CONTINGENCIES - $3,000) 27 (97) SR 60, RECONSTRUCTION, REDESIGN 28 INTERCHANGE REALIGNMENT, SAFETY 29 IMPROVEMENT AND SIGNING 2,000,000 30 (BASE PROJECT ALLOCATION - $2,000,000) 20080S1504B2377 - 25 -
1 (98) SR 8, WIDEN THE EXISTING PAVEMENT TO 2 PROVIDE TURNING LANES 156,000 3 (BASE PROJECT ALLOCATION - $156,000) 4 (99) SR 48, EXTENSION OF MARSH DRIVE TO 5 INTERSECT SR 48 910,000 6 (BASE PROJECT ALLOCATION - $800,000) 7 (LAND ALLOCATION - $100,000) 8 (DESIGN AND CONTINGENCIES - $10,000) 9 SECTION 303. ARMSTRONG COUNTY. 10 PROJECTS ARE AS FOLLOWS: 11 (1) SR 28, NEW PARK AND RIDE LOT 113,000 12 (BASE PROJECT ALLOCATION - $102,000) 13 (LAND ALLOCATION - $11,000) 14 (2) SR 28, PAVEMENT RECONSTRUCTION AND 15 REHABILITATION 1,380,000 16 (BASE PROJECT ALLOCATION - $1,380,000) 17 (3) SR 422, PAVEMENT RECONSTRUCTION AND 18 REHABILITATION 520,000 19 (BASE PROJECT ALLOCATION - $520,000) 20 (4) SR 422, PAVEMENT RECONSTRUCTION AND 21 REHABILITATION 140,000 22 (BASE PROJECT ALLOCATION - $140,000) 23 (5) SR 422, RESTORATION AND SAFETY 24 IMPROVEMENTS 17,600,000 25 (BASE PROJECT ALLOCATION - $14,400,000) 26 (LAND ALLOCATION - $1,600,000) 27 (DESIGN AND CONTINGENCIES - $1,600,000) 28 SECTION 304. BEAVER COUNTY. 29 PROJECTS ARE AS FOLLOWS: 30 (1) SR 1003, CONCRETE PAVEMENT 20080S1504B2377 - 26 -
1 RECONSTRUCTION, REHABILITATION, SR 2 1003, HILLSIDE AVENUE TO T-65, ELWOOD 3 CITY BOROUGH 330,000 4 (BASE PROJECT ALLOCATION - $300,000) 5 (DESIGN AND CONTINGENCIES - $30,000) 6 (2) SR 1003, CONCRETE REHABILITATION, 7 RECONSTRUCT AND BITUMINOUS OVERLAY, 8 BRIGHTON ROAD FROM CHERRY HILL ROAD TO 9 HILLSIDE AVENUE, ELWOOD CITY BOROUGH 10 AND NORTH SEWICKLEY TOWNSHIP 234,000 11 (BASE PROJECT ALLOCATION - $234,000) 12 (3) SR 1003, CONCRETE PAVEMENT 13 RECONSTRUCTION, REHABILITATION, 14 BRIGHTON ROAD FROM ROUTE 65 TO SR 1002 15 AND CHERRY HILL ROAD, NORTH SEWICKLEY 16 TOWNSHIP 701,000 17 (BASE PROJECT ALLOCATION - $637,000) 18 (DESIGN AND CONTINGENCIES - $64,000) 19 (4) SR 1021, CONCRETE REHABILITATION, 20 RECONSTRUCT, PINE RUN ROAD FROM SR 1015 21 TO ROUTE 588, MARION TOWNSHIP 560,000 22 (BASE PROJECT ALLOCATION - $560,000) 23 (5) SR 1024, CONCRETE REHABILITATION, 24 RECONSTRUCT AND BITUMINOUS OVERLAY, 25 DEER LANE EXTENSION FROM VIRGINIA 26 AVENUE TO BIG KNOB ROAD, NEW SEWICKLEY 27 AND ROCHESTER TOWNSHIPS 943,000 28 (BASE PROJECT ALLOCATION - $943,000) 29 (6) SR 1039, CONCRETE REHABILITATION, 30 RECONSTRUCT AND BITUMINOUS OVERLAY, 20080S1504B2377 - 27 -
1 VIRGINIA AVENUE AND ROCHESTER ROAD FROM 2 SR 68 TO SUNFLOWER ROAD, PULASKI AND 3 ROCHESTER TOWNSHIPS 364,000 4 (BASE PROJECT ALLOCATION - $364,000) 5 (7) SR 151, CONCRETE REHABILITATION, 6 RECONSTRUCT AND BITUMINOUS OVERLAY, 7 BOCKTOWN ROAD FROM ROUTE 30 TO THOMPSON 8 HILL ROAD, GREENE, HANOVER, 9 INDEPENDENCE AND RACCOON TOWNSHIPS 2,260,000 10 (BASE PROJECT ALLOCATION - $2,210,000) 11 (DESIGN AND CONTINGENCIES - $50,000) 12 (8) SR 151, CONCRETE REHABILITATION, 13 RECONSTRUCT AND BITUMINOUS OVERLAY, 14 BOCKTOWN ROAD FROM THOMPSON HILL ROAD 15 TO ROUTE 60 INTERCHANGE, HOPEWELL AND 16 INDEPENDENCE TOWNSHIPS 1,089,000 17 (BASE PROJECT ALLOCATION - $1,089,000) 18 (9) SR 168, CONCRETE PAVEMENT 19 RECONSTRUCTION, REHABILITATION, 20 HOOKSTOWN AND FRANKFURT ROAD FROM 21 TEMPLE ROAD TO ROUTE 30, GREENE 22 TOWNSHIP 571,000 23 (BASE PROJECT ALLOCATION - $519,000) 24 (DESIGN AND CONTINGENCIES - $52,000) 25 (10) SR 18, CONCRETE REHABILITATION, 26 RECONSTRUCT AND BITUMINOUS OVERLAY, 27 MAIN STREET FROM WASHINGTON COUNTY LINE 28 TO TRAVERSE CREEK, FRANKFORT SPRINGS 29 BOROUGH AND HANOVER TOWNSHIP 699,000 30 (BASE PROJECT ALLOCATION - $699,000) 20080S1504B2377 - 28 -
1 (11) SR 18, CONCRETE REHABILITATION, 2 RECONSTRUCT AND BITUMINOUS OVERLAY, 3 FRANKFORT ROAD FROM CENTURY FARM ROAD 4 TO HANOVER KENDALL ROAD, HANOVER 5 TOWNSHIP 192,000 6 (BASE PROJECT ALLOCATION - $192,000) 7 (12) SR 18, CONCRETE REHABILITATION, 8 RECONSTRUCT AND BITUMINOUS OVERLAY, 9 FRANKFORT ROAD FROM NEWER PAVEMENT TO 10 SERVICE CREEK ROAD, HANOVER AND RACCOON 11 TOWNSHIPS 628,000 12 (BASE PROJECT ALLOCATION - $628,000) 13 (13) SR 2001, CONCRETE REHABILITATION, 14 RECONSTRUCT, EASTBOUND DUSS AVENUE FROM 15 TWENTY-FOURTH STREET TO LEGIONVILLE 16 ROAD, HARMONY TOWNSHIP 816,000 17 (BASE PROJECT ALLOCATION - $816,000) 18 (14) SR 2001, CONCRETE REHABILITATION, 19 RECONSTRUCT, WESTBOUND DUSS AVENUE FROM 20 TWENTY-FOURTH STREET TO LEGIONVILLE 21 ROAD, HARMONY TOWNSHIP 816,000 22 (BASE PROJECT ALLOCATION - $816,000) 23 (15) SR 2004, CONCRETE PAVEMENT 24 RECONSTRUCTION, REHABILITATION, NINTH 25 STREET FROM THIRD AVENUE TO FREEDOM- 26 CRIDER ROAD, FREEDOM BOROUGH AND NORTH 27 SEWICKLEY TOWNSHIP 386,000 28 (BASE PROJECT ALLOCATION - $351,000) 29 (DESIGN AND CONTINGENCIES - $35,000) 30 (16) SR 2004, REALIGNMENT AND ROADWAY 20080S1504B2377 - 29 -
1 RECONSTRUCTION, SAFETY IMPROVEMENT, 2 FREEDOM ROAD FROM SR 65 TO PARK QUARRY 3 ROAD UPGRADE, PHASE A, NEW SEWICKLEY 4 TOWNSHIP 4,400,000 5 (BASE PROJECT ALLOCATION - $4,400,000) 6 (17) SR 2004, SLIDES CORRECTION CONCRETE 7 REHABILITATION, RECONSTRUCTION, LOVI 8 ROAD, SR 2004, SEGMENT 0040 TO SEGMENT 9 0050, NEW SEWICKLEY TOWNSHIP 930,000 10 (BASE PROJECT ALLOCATION - $850,000) 11 (LAND ALLOCATION - $30,000) 12 (DESIGN AND CONTINGENCIES - $50,000) 13 (18) SR 2005, CONCRETE PAVEMENT 14 RECONSTRUCTION, REHABILITATION, CONWAY 15 WALLROSE ROAD FROM BIG SEWICKLEY CREEK 16 ROAD TO PFAFF ROAD, ECONOMY BOROUGH 2,200,000 17 (BASE PROJECT ALLOCATION - $2,000,000) 18 (DESIGN AND CONTINGENCIES - $200,000) 19 (19) SR 2005, CONCRETE PAVEMENT 20 RECONSTRUCTION, REHABILITATION, CONWAY 21 WALLROSE ROAD FROM RIDGE ROAD EXTENSION 22 TO PFAFF ROAD, ECONOMY BOROUGH 528,000 23 (BASE PROJECT ALLOCATION - $480,000) 24 (DESIGN AND CONTINGENCIES - $48,000) 25 (20) SR 2006, CONCRETE PAVEMENT 26 RECONSTRUCTION, REHABILITATION, GOLDEN 27 GROVE ROAD FROM SR 4052 TO LOCUST 28 STREET, ECONOMY BOROUGH 598,000 29 (BASE PROJECT ALLOCATION - $543,000) 30 (DESIGN AND CONTINGENCIES - $55,000) 20080S1504B2377 - 30 -
1 (21) SR 30, CONCRETE PAVEMENT 2 RECONSTRUCTION, REHABILITATION, LINCOLN 3 HIGHWAY FROM WEST VIRGINIA LINE TO PAST 4 RED DOG ROAD, GREENE TOWNSHIP 330,000 5 (BASE PROJECT ALLOCATION - $300,000) 6 (DESIGN AND CONTINGENCIES - $30,000) 7 (22) SR 3005, CONCRETE REHABILITATION, 8 RECONSTRUCT AND BITUMINOUS OVERLAY, 9 CHAPEL ROAD FROM BRODHEAD ROAD TO 10 FRANKFORT ROAD, CITY OF ALIQUIPPA AND 11 CENTER AND HOPEWELL TOWNSHIPS 1,667,000 12 (BASE PROJECT ALLOCATION - $1,667,000) 13 (23) SR 3012, CONCRETE REHABILITATION, 14 RECONSTRUCT AND BITUMINOUS OVERLAY, 15 CENTER GRANGE ROAD FROM BRODHEAD ROAD 16 TO MONACA ROAD, CENTER TOWNSHIP 904,000 17 (BASE PROJECT ALLOCATION - $904,000) 18 (24) SR 3014, CONCRETE REHABILITATION, 19 RECONSTRUCT AND BITUMINOUS OVERLAY, 20 GOLF COURSE ROAD FROM MILL STREET TO 21 DEAD END, CITY OF ALIQUIPPA AND CENTER 22 AND HOPEWELL TOWNSHIPS 439,000 23 (BASE PROJECT ALLOCATION - $439,000) 24 (25) SR 3016, CONCRETE REHABILITATION, 25 RECONSTRUCT AND BITUMINOUS OVERLAY, 26 GREEN GARDEN ROAD FROM FRANKFORT ROAD 27 TO CLEARVIEW ROAD, RACCOON TOWNSHIP 1,030,000 28 (BASE PROJECT ALLOCATION - $1,030,000) 29 (26) SR 3036, CONCRETE REHABILITATION, 30 RECONSTRUCT AND BITUMINOUS OVERLAY, 20080S1504B2377 - 31 -
1 GRINGO AND INDEPENDENCE ROAD FROM 2 BOCKTOWN ROAD TO INDEPENDENCE ROAD, 3 HOPEWELL AND INDEPENDENCE TOWNSHIPS 605,000 4 (BASE PROJECT ALLOCATION - $605,000) 5 (27) SR 351, CONCRETE REHABILITATION, 6 RECONSTRUCT AND BITUMINOUS OVERLAY, 7 FAIRLAND BOULEVARD FROM SR 18 TO SR 8 168, BIG BEAVER, KOPPEL AND NEW GALILEE 9 BOROUGHS 1,505,000 10 (BASE PROJECT ALLOCATION - $1,417,000) 11 (LAND ALLOCATION - $8,000) 12 (DESIGN AND CONTINGENCIES - $80,000) 13 (28) SR 4002, CONCRETE REHABILITATION, 14 RECONSTRUCT AND BITUMINOUS OVERLAY, 15 LITTLE BOWER AND ANDER FROM ROUTE 51 TO 16 LAWRENCE COUNTY LINE, DARLINGTON 17 TOWNSHIP 923,000 18 (BASE PROJECT ALLOCATION - $923,000) 19 (29) SR 4008, CONCRETE PAVEMENT 20 RECONSTRUCTION, REHABILITATION, BRAUN 21 ROAD FROM SHENANGO ROAD TO ROUTE 51, 22 CHIPPEWA AND PATTERSON TOWNSHIPS 598,000 23 (BASE PROJECT ALLOCATION - $543,000) 24 (DESIGN AND CONTINGENCIES - $55,000) 25 (30) SR 4011, CONCRETE REHABILITATION, 26 RECONSTRUCT AND BITUMINOUS OVERLAY, 27 ELMBROOK ROAD FROM SR 251 TO MCCLAIN 28 ROAD, SOUTH BEAVER TOWNSHIP 468,000 29 (BASE PROJECT ALLOCATION - $468,000) 30 (31) SR 4016, CONCRETE PAVEMENT 20080S1504B2377 - 32 -
1 RECONSTRUCTION, REHABILITATION, BEANER 2 HOLLOW ROAD FROM DUTCH RIDGE ROAD TO 3 RIVERSIDE DRIVE, BRIDGEWATER BOROUGH 4 AND BRIGHTON TOWNSHIP 501,000 5 (BASE PROJECT ALLOCATION - $455,000) 6 (DESIGN AND CONTINGENCIES - $46,000) 7 (32) SR 4019, CONCRETE REHABILITATION, 8 RECONSTRUCT AND BITUMINOUS OVERLAY, 9 PARK ROAD FROM BRADY'S RUN ROAD TO 10 BLACKHAWK ROAD, BRIGHTON AND CHIPPEWA 11 TOWNSHIPS 1,121,000 12 (BASE PROJECT ALLOCATION - $1,121,000) 13 (33) SR 4020, CONCRETE REHABILITATION, 14 RECONSTRUCT AND BITUMINOUS OVERLAY, 15 DUTCH RIDGE ROAD FROM TUSCAWARAS ROAD 16 TO PARK ROAD, BRIGHTON TOWNSHIP 910,000 17 (BASE PROJECT ALLOCATION - $910,000) 18 (34) SR 4021, CONCRETE REHABILITATION, 19 RECONSTRUCT AND BITUMINOUS OVERLAY, 20 SHANANGO ROAD FROM BRAUN ROAD TO 21 DARLINGTON ROAD, CHIPPEWA TOWNSHIP 455,000 22 (BASE PROJECT ALLOCATION - $455,000) 23 (35) SR 4028, CONCRETE REHABILITATION, 24 RECONSTRUCT AND BITUMINOUS OVERLAY, 25 TUSCAWARAS ROAD FROM FAIRVIEW ROAD TO 26 GEORGETOWN LANE, OHIOVILLE BOROUGH, 27 BRIGHTON AND VANPORT TOWNSHIPS 3,250,000 28 (BASE PROJECT ALLOCATION - $3,250,000) 29 (36) SR 4045, CONCRETE PAVEMENT 30 RECONSTRUCTION, REHABILITATION, MURPHY 20080S1504B2377 - 33 -
1 HILL ROAD FROM MIDLAND AVENUE TO 2 SUNRISE DRIVE, INDUSTRY AND MIDLAND 3 BOROUGHS 330,000 4 (BASE PROJECT ALLOCATION - $300,000) 5 (DESIGN AND CONTINGENCIES - $30,000) 6 (37) SR 51, CONCRETE PAVEMENT 7 RECONSTRUCTION, REHABILITATION, PENNA 8 AVENUE EASTBOUND FROM SR 251 TO SR 168, 9 CHIPPEWA AND SOUTH BEAVER TOWNSHIPS 3,300,000 10 (BASE PROJECT ALLOCATION - $3,000,000) 11 (DESIGN AND CONTINGENCIES - $300,000) 12 (38) SR 51, CONCRETE PAVEMENT 13 RECONSTRUCTION, REHABILITATION, PENNA 14 AVENUE WESTBOUND FROM SR 251 TO SR 168, 15 CHIPPEWA AND SOUTH BEAVER TOWNSHIPS 3,300,000 16 (BASE PROJECT ALLOCATION - $3,000,000) 17 (DESIGN AND CONTINGENCIES - $300,000) 18 (39) SR 51, CONCRETE PAVEMENT 19 RECONSTRUCTION, REHABILITATION, PENNA 20 AVENUE FROM SR 168 TO TAGGERT ROAD, 21 CHIPPEWA, DARLINGTON AND SOUTH BEAVER 22 TOWNSHIPS 4,950,000 23 (BASE PROJECT ALLOCATION - $4,500,000) 24 (DESIGN AND CONTINGENCIES - $450,000) 25 (40) SR 51, CONCRETE PAVEMENT 26 RECONSTRUCTION, REHABILITATION, PENNA 27 AVENUE WESTBOUND FROM SR 168 TO TAGGERT 28 ROAD, CHIPPEWA, DARLINGTON AND SOUTH 29 BEAVER TOWNSHIPS 4,950,000 30 (BASE PROJECT ALLOCATION - $4,500,000) 20080S1504B2377 - 34 -
1 (DESIGN AND CONTINGENCIES - $450,000) 2 (41) SR 60, CONCRETE REHABILITATION, 3 RECONSTRUCTION, SR 60 FROM CHIPPEWA TO 4 VANPORT, BRIGHTON, CHIPPEWA AND VANPORT 5 TOWNSHIPS 3,851,000 6 (BASE PROJECT ALLOCATION - $3,426,000) 7 (DESIGN AND CONTINGENCIES - $425,000 8 (42) SR 60, CONCRETE REHABILITATION, 9 RECONSTRUCTION, SR 60 FROM VANPORT TO 10 CENTER TOWNSHIP, CENTER, POTTER AND 11 VANPORT TOWNSHIPS 2,035,000 12 (BASE PROJECT ALLOCATION - $1,850,000) 13 (DESIGN AND CONTINGENCIES - $185,000) 14 (43) SR 60, CONCRETE REHABILITATION, 15 RECONSTRUCTION, SR 60, I-376, PART 6, 16 NORTHBOUND SEGMENT 0030 TO SEGMENT 0010 17 AND SOUTHBOUND SEGMENT 0031 TO SEGMENT 18 0011, HOPEWELL AND INDEPENDENCE 19 TOWNSHIPS 1,353,000 20 (BASE PROJECT ALLOCATION - $1,230,000) 21 (DESIGN AND CONTINGENCIES - $123,000) 22 (44) SR 60, RECONSTRUCTION, INTERCHANGES, 23 SAFETY FEATURES AND CROSSOVERS 24 UPGRADES, SR 60, ALLEGHENY COUNTY LINE 25 TO SR 60 TOLL ROAD, VARIOUS 26 MUNICIPALITIES 16,500,000 27 (BASE PROJECT ALLOCATION - $15,000,000) 28 (DESIGN AND CONTINGENCIES - $1,500,000) 29 (45) SR 65, SAFETY IMPROVEMENT, SR 65 FROM 30 BADEN TO ROCHESTER, BADEN BOROUGH 193,000 20080S1504B2377 - 35 -
1 (BASE PROJECT ALLOCATION - $175,000) 2 (DESIGN AND CONTINGENCIES - $18,000) 3 (46) SR 65, CONCRETE PAVEMENT 4 RECONSTRUCTION, REHABILITATION, SR 65 5 NORTHBOUND, FRENCH POINT BRIDGE TO 6 TEVEBAUGH ROAD, BADEN AND ECONOMY 7 BOROUGHS AND HARMONY TOWNSHIP 2,309,000 8 (BASE PROJECT ALLOCATION - $2,280,000) 9 (DESIGN AND CONTINGENCIES - $29,000) 10 (47) SR 65, CONCRETE PAVEMENT 11 RECONSTRUCTION, REHABILITATION, SR 65 12 SOUTHBOUND, FRENCH POINT BRIDGE TO 13 TEVEBAUGH ROAD, BADEN AND ECONOMY 14 BOROUGHS AND HARMONY TOWNSHIP 2,563,000 15 (BASE PROJECT ALLOCATION - $2,328,000) 16 (DESIGN AND CONTINGENCIES - $235,000) 17 (48) SR 65, CONCRETE PAVEMENT 18 RECONSTRUCTION, REHABILITATION, MERCER 19 ROAD FROM FIFTH AVENUE TO FOURTH 20 STREET, NEW BRIGHTON BOROUGH 330,000 21 (BASE PROJECT ALLOCATION - $300,000) 22 (DESIGN AND CONTINGENCIES - $30,000) 23 (49) SR 68, CONCRETE REHABILITATION, 24 RECONSTRUCT AND BITUMINOUS OVERLAY, SR 25 68 FROM SR 1039 TO NEW PAVEMENT, 26 DAUGHERTY, NEW SEWICKLEY AND ROCHESTER 27 TOWNSHIPS 1,261,000 28 (BASE PROJECT ALLOCATION - $1,261,000) 29 (50) SR 68, CONCRETE REHABILITATION, 30 RECONSTRUCT AND BITUMINOUS OVERLAY, SR 20080S1504B2377 - 36 -
1 68 FROM WOLFES RUN ROAD TO KINDER 2 MORGAN TERMINALS, INDUSTRY BOROUGH 163,000 3 (BASE PROJECT ALLOCATION - $163,000) 4 (51) SR 68, CONCRETE REHABILITATION, 5 CONCRETE PAVEMENT RECONSTRUCTION, 6 REHABILITATION, 68 MONTROSE DRIVE TO 7 BUTLER COUNTY LINE, MARION AND NEW 8 SEWICKLEY TOWNSHIPS 580,000 9 (BASE PROJECT ALLOCATION - $513,000) 10 (LAND ALLOCATION - $3,000) 11 (DESIGN AND CONTINGENCIES - $64,000) 12 (52) SR 68, CONCRETE PAVEMENT 13 RECONSTRUCTION, REHABILITATION, 14 VIRGINIA AVENUE FROM SR 1024 TO SR 15 1039, ROCHESTER BOROUGH AND ROCHESTER 16 TOWNSHIP 330,000 17 (BASE PROJECT ALLOCATION - $300,000) 18 (DESIGN AND CONTINGENCIES - $30,000) 19 (53) VARIOUS, RETAINING WALLS AND SLIDE 20 CORRECTIONS 80,000 21 (LAND ALLOCATION - $80,000) 22 SECTION 305. BEDFORD COUNTY. 23 PROJECTS ARE AS FOLLOWS: 24 (1) SR 70, RESTORATION, REHABILITATION, 25 SAFETY IMPROVEMENTS, I-70, BREEZEWOOD 26 TO FULTON COUNTY LINE, EAST PROVIDENCE 27 TOWNSHIP 850,000 28 (BASE PROJECT ALLOCATION - $850,000) 29 (2) I-70, INTERSTATE RESTORATION AND 30 RECONSTRUCTION 3,500,000 20080S1504B2377 - 37 -
1 (BASE PROJECT ALLOCATION - $3,500,000) 2 (3) I-99, INTERSTATE RESTORATION AND 3 RECONSTRUCTION 14,000,000 4 (BASE PROJECT ALLOCATION - $14,000,000) 5 (4) SR 26, INTERSECTION IMPROVEMENT, 6 SAFETY IMPROVEMENT 845,000 7 (BASE PROJECT ALLOCATION - $700,000) 8 (LAND ALLOCATION - $100,000) 9 (DESIGN AND CONTINGENCIES - $45,000) 10 (5) SR 4009, WIDEN, RESURFACE AND 11 INTERSECTION IMPROVEMENTS, 12 SIGNALIZATION 465,000 13 (BASE PROJECT ALLOCATION - $465,000) 14 (6) SR 1007, CONCRETE PAVEMENT RESTORATION 15 AND OVERLAY 6,600,000 16 (BASE PROJECT ALLOCATION - $6,600,000) 17 (7) SR 220, OVERLAY AND SHOULDER UPGRADE 1,526,000 18 (BASE PROJECT ALLOCATION - $1,526,000) 19 (8) SR 30, CONCRETE PAVEMENT RESTORATION 20 AND OVERLAY 769,000 21 (BASE PROJECT ALLOCATION - $769,000) 22 (9) SR 30, CONCRETE PAVEMENT RESTORATION 23 AND OVERLAY AND UPGRADE DRAINAGE 4,900,000 24 (DESIGN AND CONTINGENCIES - $4,900,000 25 (10) SR 56, CONCRETE PAVEMENT RESTORATION 26 AND OVERLAY 2,250,000 27 (BASE PROJECT ALLOCATION - $2,250,000) 28 SECTION 306. BERKS COUNTY. 29 PROJECTS ARE AS FOLLOWS: 30 (1) SR 1010, INTERSECTION SIGNALIZATION, 20080S1504B2377 - 38 -
1 SR 1010 AND DRIES ROAD INTERSECTION, 2 ONTELAUNEE TOWNSHIP 200,000 3 (BASE PROJECT ALLOCATION - $50,000) 4 (DESIGN AND CONTINGENCIES - $150,000) 5 (2) SR 1021, SAFETY IMPROVEMENT, TREE 6 CUTTING, EXCAVATING AND SHOULDER WORK, 7 SR 1021 AND SR 1024, LONG LANE 8 INTERSECTION, MAXATAWNY TOWNSHIP 325,000 9 (BASE PROJECT ALLOCATION - $75,000) 10 (DESIGN AND CONTINGENCIES - $250,000) 11 (3) SR 12, EXCAVATING, EMBANKMENT, 12 SHOULDERS, GUIDE RAIL AND UTILITY 13 POLES, SR 12, SAFETY IMPROVEMENTS, 14 ALSACE TOWNSHIP 600,000 15 (BASE PROJECT ALLOCATION - $100,000) 16 (DESIGN AND CONTINGENCIES - $500,000) 17 (4) SR 222, HIGHWAY RECONSTRUCTION, SR 18 222, NORTH CORRIDOR PHASE I, 19 MAIDENCREEK, ONTELAUNEE AND RICHMOND 20 TOWNSHIPS 36,600,000 21 (BASE PROJECT ALLOCATION - $30,600,000) 22 (LAND ALLOCATION - $2,800,000) 23 (DESIGN AND CONTINGENCIES - $3,200,000) 24 (5) SR 222, INSTALL CLOSED CIRCUIT 25 TELEVISION CAMERAS, ROUTE 222, NONURBAN 26 AREA, VARIOUS MUNICIPALITIES 1,124,000 27 (BASE PROJECT ALLOCATION - $254,000) 28 (LAND ALLOCATION - $20,000) 29 (DESIGN AND CONTINGENCIES - $850,000) 30 (6) SR 222 AND SR 422, INSTALLATION OF 20080S1504B2377 - 39 -
1 DYNAMIC MESSAGE SIGNS, SR 222 AND SR 2 422, NONURBAN AREA, VARIOUS 3 MUNICIPALITIES 410,000 4 (BASE PROJECT ALLOCATION - $250,000) 5 (LAND ALLOCATION - $15,000) 6 (DESIGN AND CONTINGENCIES - $145,000) 7 (7) SR 222 AND SR 422, INSTALLATION OF 8 VARIABLE MESSAGE SIGNS AND CLOSED 9 CIRCUIT TELEVISION CAMERAS, SR 222 AND 10 SR 422 URBAN AREA, VARIOUS 11 MUNICIPALITIES 390,000 12 (BASE PROJECT ALLOCATION - $225,000) 13 (LAND ALLOCATION - $15,000) 14 (DESIGN AND CONTINGENCIES - $150,000) 15 (8) SR 3008, INTERSECTION IMPROVEMENT AND 16 CURVE SAFETY IMPROVEMENTS, SR 3008, 17 SEGMENT 50 TO SEGMENT 60, LOWER 18 HEIDELBERG AND NORTH HEIDELBERG 19 TOWNSHIPS 300,000 20 (BASE PROJECT ALLOCATION - $75,000) 21 (DESIGN AND CONTINGENCIES - $225,000) 22 (9) SR 3023, CURVE SAFETY IMPROVEMENTS, SR 23 3023, VICINITY OF EVANS HILL ROAD AND 24 SWEITZER ROAD, LOWER HEIDELBERG 25 TOWNSHIP 300,000 26 (BASE PROJECT ALLOCATION - $75,000) 27 (DESIGN AND CONTINGENCIES - $225,000) 28 (10) SR 422, CONGESTION REDUCTION, SAFETY 29 IMPROVEMENTS, PENN AVENUE, SR 422 30 CORRIDOR, ROBESONIA, SINKING SPRING AND 20080S1504B2377 - 40 -
1 WERNERSVILLE BOROUGHS, HEIDELBERG, 2 LOWER HEIDELBERG AND SOUTH HEIDELBERG 3 TOWNSHIPS 360,000 4 (BASE PROJECT ALLOCATION - $285,000) 5 (LAND ALLOCATION - $15,000) 6 (DESIGN AND CONTINGENCIES - $60,000) 7 (11) SR 562, INTERSECTION IMPROVEMENT, 8 CONGESTION MITIGATION, SR 562, 9 INTERSECTION OF SHELBOURNE ROAD, 10 BOYERTOWN PIKE AND OLEY TURNPIKE ROAD, 11 EXETER AND OLEY TOWNSHIPS 400,000 12 (BASE PROJECT ALLOCATION - $100,000) 13 (LAND ALLOCATION - $40,000) 14 (DESIGN AND CONTINGENCIES - $260,000) 15 (12) SR 78, REPLACEMENT OF PRECAST 16 PARAPETS, RATS PRECAST PARAPETS, 17 GREENWICH TOWNSHIP 475,000 18 (BASE PROJECT ALLOCATION - $20,000) 19 (DESIGN AND CONTINGENCIES - $455,000) 20 (13) SR 78, SAFETY GATES, SR 78 CORRIDOR, 21 VARIOUS MUNICIPALITIES 525,000 22 (BASE PROJECT ALLOCATION - $525,000) 23 (14) SR 78, INSTALLATION OF CLOSED CIRCUIT 24 TELEVISION CAMERAS, HIGHWAY ADVISORY 25 RADIO, CHANGEABLE MESSAGE SIGNS, I-78 26 CORRIDOR AND SR 61 INTO I-78 27 INTERSECTION, VARIOUS MUNICIPALITIES 490,000 28 (BASE PROJECT ALLOCATION - $360,000) 29 (LAND ALLOCATION - $15,000) 30 (DESIGN AND CONTINGENCIES - $115,000) 20080S1504B2377 - 41 -
1 (15) SR 78, INSTALL TENTH MILE LOCATION 2 MARKERS, SAFETY IMPROVEMENT, I-78 3 CORRIDOR, VARIOUS MUNICIPALITIES 102,000 4 (BASE PROJECT ALLOCATION - $7,000) 5 (DESIGN AND CONTINGENCIES - $95,000) 6 (16) I-176, INTERSTATE RESTORATION AND 7 RECONSTRUCTION 11,100,000 8 (BASE PROJECT ALLOCATION - $11,100,000) 9 (17) I-78, INTERSTATE RESTORATION AND 10 RECONSTRUCTION 38,500,000 11 (BASE PROJECT ALLOCATION - $38,500,000) 12 (18) SR 183, INTERSECTION IMPROVEMENT 268,000 13 (BASE PROJECT ALLOCATION - $111,000) 14 (LAND ALLOCATION - $52,000) 15 (DESIGN AND CONTINGENCIES - $105,000) 16 (19) SR 82, HIGHWAY RESTORATION 1,500,000 17 (BASE PROJECT ALLOCATION - $1,500,000) 18 SECTION 307. BLAIR COUNTY. 19 PROJECTS ARE AS FOLLOWS: 20 (1) SR 1001, WIDEN, ADD LANE, PLEASANT 21 VALLEY BOULEVARD, CITY OF ALTOONA 264,000 22 (BASE PROJECT ALLOCATION - $192,500) 23 (LAND ALLOCATION - $11,500) 24 (DESIGN AND CONTINGENCIES - $60,000) 25 (2) SR 1008, PARK AND RIDE LOT, ANTIS 26 TOWNSHIP PARK AND RIDE, ADJACENT TO 27 PENNDOT STOCKPILE, ANTIS TOWNSHIP 118,000 28 (BASE PROJECT ALLOCATION - $93,000) 29 (DESIGN AND CONTINGENCIES - $25,000) 30 (3) SR 1012, PARK AND RIDE LOT, TENTH 20080S1504B2377 - 42 -
1 STREET PARK AND RIDE, UNDER BRIDGE AT 2 SR 99, TYRONE BOROUGH, SNYDER TOWNSHIP 478,000 3 (BASE PROJECT ALLOCATION - $253,000) 4 (LAND ALLOCATION - $25,000) 5 (DESIGN AND CONTINGENCIES - $200,000) 6 (4) SR 3013, CONSTRUCT CENTER TURN LANE, 7 DUNNINGS HIGHWAY CORRIDOR, PINE RUN TO 8 SOUTH OF WALNUT STREET INTERSECTION, 9 GREENFIELD TOWNSHIP 489,000 10 (BASE PROJECT ALLOCATION - $400,000) 11 (LAND ALLOCATION - $11,000) 12 (DESIGN AND CONTINGENCIES - $78,000) 13 (5) SR 36, INCREASE CLEARANCE BENEATH I- 14 99, PA 36 UNDER I-99, LOGAN TOWNSHIP 15 AND CITY OF ALTOONA 300,000 16 (BASE PROJECT ALLOCATION - $300,000) 17 (6) SR 4019, SAFETY IMPROVEMENT 18 RELOCATION, REALIGNMENT, PINECROFT 19 CURVES, ANTIS TOWNSHIP 1,740,000 20 (BASE PROJECT ALLOCATION - $1,620,000) 21 (DESIGN AND CONTINGENCIES - $120,000) 22 (7) SR 8004, RAMPS, RESTORATION, 23 REHABILITATION, SAFETY IMPROVEMENTS, I- 24 99, US 22 AND PA 764 INTERCHANGES, 25 ALLEGHENY TOWNSHIP 400,000 26 (BASE PROJECT ALLOCATION - $400,000) 27 (8) SR 8023, PAVEMENT RESTORATION, SAFETY 28 IMPROVEMENTS, I-99, BLAIR COUNTY RAMPS, 29 ALLEGHENY, ANTIS, FREEDOM, GREENFIELD, 30 LOGAN AND SNYDER TOWNSHIPS 500,000 20080S1504B2377 - 43 -
1 (BASE PROJECT ALLOCATION - $500,000) 2 (9) SR 99, RESTORATION, REHABILITATION, 3 SAFETY IMPROVEMENTS, I-99, PLANK ROAD 4 TO FRANKSTOWN ROAD, LOGAN TOWNSHIP AND 5 CITY OF ALTOONA 480,000 6 (BASE PROJECT ALLOCATION - $480,000) 7 (10) SR 99, PAVEMENT RESTORATION AND 8 REHABILITATION, I-99, SPROUL-NEWRY 9 PULL-OFF, MILEPOST 17 TO EAST FREEDOM 10 INTERCHANGE, FREEDOM AND GREENFIELD 11 TOWNSHIPS 1,750,000 12 (BASE PROJECT ALLOCATION - $1,750,000) 13 (11) I-99, INTERSTATE RESTORATION AND 14 RECONSTRUCTION 37,110,000 15 (BASE PROJECT ALLOCATION - $37,110,000) 16 (12) SR 1021, NEW ROADWAY, INTERCHANGE 17 IMPROVEMENT 745,000 18 (LAND ALLOCATION - $20,000) 19 (DESIGN AND CONTINGENCIES - $725,000) 20 (13) SR 22, CONCRETE REHABILITATION, 21 GUIDERAIL AND DRAINAGE IMPROVEMENTS 2,133,000 22 (BASE PROJECT ALLOCATION - $2,133,000) 23 (14) SR 22, ADD LANE 100,000 24 (LAND ALLOCATION - $100,000) 25 (15) SR 866, HIGHWAY REHABILITATION, 26 RESURFACING, SHOULDER IMPROVEMENT 400,000 27 (BASE PROJECT ALLOCATION - $400,000) 28 (16) SR 350, CONCRETE PAVEMENT RESTORATION 29 AND OVERLAY 2,500,000 30 (BASE PROJECT ALLOCATION - $2,500,000) 20080S1504B2377 - 44 -
1 (17) SR 36, CONCRETE PAVEMENT RESTORATION 2 AND OVERLAY 2,825,000 3 (BASE PROJECT ALLOCATION - $2,825,000) 4 (18) SR 36, REPLACE EXISTING METAL ARCH 5 PIPE WITH A BOX CULVERT 950,000 6 (BASE PROJECT ALLOCATION - $950,000) 7 (19) SR 4013, PHASE I, INTERSECTION 8 IMPROVEMENT AND WIDENING 1,500,000 9 (DESIGN AND CONTINGENCIES - $1,500,000) 10 (20) SR 4017, CONCRETE PAVEMENT 11 RESTORATION AND OVERLAY 2,165,000 12 (BASE PROJECT ALLOCATION - $2,165,000) 13 (21) SR 453, CONCRETE PAVEMENT RESTORATION 14 AND OVERLAY 1,350,000 15 (BASE PROJECT ALLOCATION - $1,350,000) 16 (22) SR 764, CONCRETE PAVEMENT RESTORATION 17 AND OVERLAY 1,900,000 18 (BASE PROJECT ALLOCATION - $1,900,000) 19 SECTION 308. BRADFORD COUNTY. 20 PROJECTS ARE AS FOLLOWS: 21 (1) SR 1043, SLIDE REPAIRS, SHESHEQUIN 22 SLIDES, SR 1043, SEGMENT 0220 TO 23 SEGMENT 0230, ATHENS AND SHESHEQUIN 24 TOWNSHIPS 2,040,000 25 (BASE PROJECT ALLOCATION - $1,780,000) 26 (LAND ALLOCATION - $40,000) 27 (DESIGN AND CONTINGENCIES - $220,000) 28 (2) SR 220, SAFETY IMPROVEMENT, TRACY ROAD 29 TO T-624, ALBANY TOWNSHIP 113,000 30 (BASE PROJECT ALLOCATION - $80,000) 20080S1504B2377 - 45 -
1 (LAND ALLOCATION - $6,000) 2 (DESIGN AND CONTINGENCIES - $27,000) 3 (3) SR 467, SLIDE REPAIRS, SR 467, SEGMENT 4 20 AND SEGMENT 180, PIKE AND ROME 5 TOWNSHIPS 980,000 6 (BASE PROJECT ALLOCATION - $840,000) 7 (LAND ALLOCATION - $20,000) 8 (DESIGN AND CONTINGENCIES - $120,000) 9 (4) SR 6, SAFETY IMPROVEMENT AND 10 RESURFACE, TRACY ROAD TO T-624, 11 STANDING STONE TOWNSHIP 440,000 12 (BASE PROJECT ALLOCATION - $400,000) 13 (DESIGN AND CONTINGENCIES - $40,000) 14 (5) SR 6, INTERSECTION IMPROVEMENT, SR 6 15 AND SR 2010 INTERSECTION, WYALUSING 16 TOWNSHIP 975,000 17 (BASE PROJECT ALLOCATION - $975,000) 18 (6) SR 220, RESURFACING, RESTORATION 2,890,000 19 (BASE PROJECT ALLOCATION - $2,850,000) 20 (LAND ALLOCATION - $40,000) 21 (7) SR 220, RESURFACING, RESTORATION 630,000 22 (BASE PROJECT ALLOCATION - $600,000) 23 (LAND ALLOCATION - $30,000) 24 (8) SR 220, HIGHWAY RESTORATION 4,570,000 25 (BASE PROJECT ALLOCATION - $4,500,000) 26 (LAND ALLOCATION - $40,000) 27 (DESIGN AND CONTINGENCIES - $30,000) 28 (9) SR 3016, RESURFACING, RESTORATION 509,000 29 (BASE PROJECT ALLOCATION - $484,000) 30 (LAND ALLOCATION - $25,000) 20080S1504B2377 - 46 -
1 (10) SR 4024, RESURFACING, RESTORATION 1,510,000 2 (BASE PROJECT ALLOCATION - $1,500,000) 3 (LAND ALLOCATION - $10,000) 4 (11) SR 4031, RESURFACING, RESTORATION 1,254,000 5 (BASE PROJECT ALLOCATION - $1,200,000) 6 (LAND ALLOCATION - $54,000) 7 (12) SR 4039, RESURFACING, RESTORATION 2,286,000 8 (BASE PROJECT ALLOCATION - $2,180,000) 9 (LAND ALLOCATION - $106,000) 10 SECTION 309. BUCKS COUNTY. 11 PROJECTS ARE AS FOLLOWS: 12 (1) SR 202, RELOCATION, REALIGNMENT, US 13 202, PICKERTOWN ROAD TO PA 611, 14 DOYLESTOWN TOWNSHIP 87,058,000 15 (BASE PROJECT ALLOCATION - $49,600,000) 16 (LAND ALLOCATION - $19,943,000) 17 (DESIGN AND CONTINGENCIES - 18 $17,515,000) 19 (2) SR 202, WETLAND REPLACEMENT 20 ENVIRONMENTAL MITIGATION, US 202, 21 SECTION 700 WETLAND MITIGATION, NEW 22 BRITAIN TOWNSHIP 16,070,000 23 (BASE PROJECT ALLOCATION - $5,600,000) 24 (LAND ALLOCATION - $1,850,000) 25 (DESIGN AND CONTINGENCIES - $8,620,000) 26 (3) BRIDGETOWN INTERCONNECT PROJECT, 27 INCLUDING CERTAIN INTERCONNECTION, NEW 28 SIGNALS AND WIDENING, LOWER SOUTHAMPTON 29 TOWNSHIP 3,210,000 30 (BASE PROJECT ALLOCATION - $3,210,000) 20080S1504B2377 - 47 -
1 (4) I-95, INTERSTATE RESTORATION AND 2 RECONSTRUCTION 18,000,000 3 (BASE PROJECT ALLOCATION - $18,000,000) 4 (5) SR 2018, INTERSECTION IMPROVEMENT, 5 WIDEN AND PROVIDE LEFT LANE 600,000 6 (BASE PROJECT ALLOCATION - $600,000) 7 (6) SR 202, INTERSECTION IMPROVEMENT, TO 8 INCLUDE LEFT TURN LANE 230,000 9 (LAND ALLOCATION - $100,000) 10 (DESIGN AND CONTINGENCIES - $130,000) 11 (7) SR 2029, INTERSECTION IMPROVEMENT, ADD 12 TURN LANES 2,000,000 13 (BASE PROJECT ALLOCATION - $2,000,000) 14 (8) SR 2033, WIDEN, ADDITIONAL LANES 485,000 15 (BASE PROJECT ALLOCATION - $485,000) 16 (9) SR 2038, WIDEN, ADDITIONAL LANES 4,000,000 17 (BASE PROJECT ALLOCATION - $4,000,000) 18 (10) SR 2038, WIDEN FROM TWO TO FOUR LANES 19 WITH TURNING LANES, ASSOCIATED 20 IMPROVEMENTS, SIGNAL UPGRADE 2,309,000 21 (BASE PROJECT ALLOCATION - $1,369,000) 22 (LAND ALLOCATION - $120,000) 23 (DESIGN AND CONTINGENCIES - $820,000) 24 (11) SR 4033, RECONSTRUCT - INCLUDING 25 CURBS, SIDEWALKS AND DRAINAGE 1,400,000 26 (BASE PROJECT ALLOCATION - $1,400,000) 27 SECTION 310. BUTLER COUNTY. 28 PROJECTS ARE AS FOLLOWS: 29 (1) SR 228, ADDITIONAL LANES, REALIGNMENT, 30 SIMON PROPERTIES PROJECT, PA 228 FROM 20080S1504B2377 - 48 -
1 SR 3020, FREEDOM ROAD, TO SR 3021, 2 FRANKLIN ROAD, CRANBERRY TOWNSHIP 19,750,000 3 (BASE PROJECT ALLOCATION - $16,080,000) 4 (LAND ALLOCATION - $3,470,000) 5 (DESIGN AND CONTINGENCIES - $200,000) 6 (2) SR 488, PARK AND RIDE LOT EXPANSION, 7 I-79 AT PA 488, PARK-N-RIDE, 8 PORTERSVILLE BOROUGH 83,000 9 (BASE PROJECT ALLOCATION - $77,000) 10 (DESIGN AND CONTINGENCIES - $6,000) 11 (3) SR 79, RESTORATION, I-79, ALLEGHENY 12 COUNTY LINE TO SR 3025 INTERCHANGE, 13 CRANBERRY AND JACKSON TOWNSHIPS 675,000 14 (BASE PROJECT ALLOCATION - $650,000) 15 (DESIGN AND CONTINGENCIES - $25,000) 16 (4) SR 79, RESTORATION, I-79, SR 3025 17 INTERCHANGE TO PA 488 INTERCHANGE, 18 JACKSON, LANCASTER AND MUDDYCREEK 19 TOWNSHIPS 675,000 20 (BASE PROJECT ALLOCATION - $650,000) 21 (DESIGN AND CONTINGENCIES - $25,000) 22 (5) SR 79, RESTORATION, I-79, PA 488 23 INTERCHANGE TO LAWRENCE COUNTY LINE, 24 MUDDYCREEK AND WORTH TOWNSHIPS 675,000 25 (BASE PROJECT ALLOCATION - $650,000) 26 (DESIGN AND CONTINGENCIES - $25,000) 27 (6) I-79, INTERSTATE RESTORATION AND 28 RECONSTRUCTION 26,800,000 29 (BASE PROJECT ALLOCATION - $26,800,000) 30 (7) I-80, INTERSTATE RESTORATION AND 20080S1504B2377 - 49 -
1 RECONSTRUCTION 1,700,000 2 (BASE PROJECT ALLOCATION - $1,700,000) 3 (8) SR 422, PAVEMENT RECONSTRUCTION AND 4 REHABILITATION 260,000 5 (BASE PROJECT ALLOCATION - $260,000) 6 (9) SR 422, PAVEMENT RECONSTRUCTION AND 7 REHABILITATION 260,000 8 (BASE PROJECT ALLOCATION - $260,000) 9 (10) SR 422, PAVEMENT RECONSTRUCTION AND 10 REHABILITATION 1,320,000 11 (BASE PROJECT ALLOCATION - $1,320,000) 12 (11) SR 422, PAVEMENT RECONSTRUCTION AND 13 REHABILITATION 840,000 14 (BASE PROJECT ALLOCATION - $840,000) 15 SECTION 311. CAMBRIA COUNTY. 16 PROJECTS ARE AS FOLLOWS: 17 (1) SR 1021, ROADWAY REALIGNMENT, SAFETY 18 IMPROVEMENT, PRELOH HILL CURVE 19 BEGINNING AT THE INTERSECTION WITH 20 STOLTZ ROAD, T-523, AND CONTINUES EAST 21 0.5 MILE, CLEARFIELD TOWNSHIP 255,000 22 (BASE PROJECT ALLOCATION - $185,000) 23 (LAND ALLOCATION - $19,000) 24 (DESIGN AND CONTINGENCIES - $51,000) 25 (2) SR 22, HIGHWAY RECONSTRUCTION, 26 CONCRETE REHABILITATION, MUNDYS CORNER 27 TO T-418, CAMBRIA AND JACKSON 28 TOWNSHIPS 3,550,000 29 (BASE PROJECT ALLOCATION - $3,400,000) 30 (DESIGN AND CONTINGENCIES - $150,000) 20080S1504B2377 - 50 -
1 (3) SR 3007, TRAFFIC STUDIES SAFETY 2 IMPROVEMENT, GOUCHER STREET FROM 3 MENOHER BOULEVARD, PA 271, INTERSECTION 4 TO WESTGATE DRIVE, T-377, WESTMONT 5 BOROUGH AND LOWER YODER TOWNSHIP 751,000 6 (BASE PROJECT ALLOCATION - $555,0000) 7 (LAND ALLOCATION - $96,000) 8 (DESIGN AND CONTINGENCIES - $100,000) 9 (4) SR 56, VARIOUS SAFETY AND MOBILITY 10 IMPROVEMENTS, PA 56 WEST CORRIDOR, 11 LOWER YODER TOWNSHIP LINE TO 12 INTERSECTION OF WASHINGTON STREET, CITY 13 OF JOHNSTOWN 950,000 14 (BASE PROJECT ALLOCATION - $630,000) 15 (LAND ALLOCATION - $140,000) 16 (DESIGN AND CONTINGENCIES - $180,000) 17 (5) SR 869, ROADWAY REALIGNMENT, CURVE 18 ADJUSTMENT SAFETY IMPROVEMENT, BEAVER 19 RUN CURVE FROM FOREST STREET, T-503, TO 20 VILLAGE OF BEAVERDALE, ADAMS AND CROYLE 21 TOWNSHIPS 360,000 22 (BASE PROJECT ALLOCATION - $300,000) 23 (LAND ALLOCATION - $30,000) 24 (DESIGN AND CONTINGENCIES - $30,000) 25 (6) SR 219, CONCRETE PAVEMENT RESTORATION 26 AND OVERLAY 1,620,000 27 (BASE PROJECT ALLOCATION - $1,620,000) 28 (7) SR 219, CONCRETE PAVEMENT RESTORATION 29 AND OVERLAY 6,875,000 30 (DESIGN AND CONTINGENCIES - $6,875,000) 20080S1504B2377 - 51 -
1 (8) SR 219, CONCRETE PAVEMENT RESTORATION 2 AND OVERLAY 4,000,000 3 (DESIGN AND CONTINGENCIES - $4,000,000) 4 (9) SR 22, CONCRETE PAVEMENT RESTORATION 5 AND OVERLAY 3,000,000 6 (BASE PROJECT ALLOCATION - $3,000,000) 7 (10) SR 22, CONCRETE PAVEMENT RESTORATION 8 AND OVERLAY 8,228,000 9 (BASE PROJECT ALLOCATION - $8,228,000) 10 (11) SR 3024, RESURFACING AND 11 RECONSTRUCTION OF RETAINING WALL 12 SYSTEM 2,250,000 13 (DESIGN AND CONTINGENCIES - $2,250,000) 14 SECTION 312. CAMERON COUNTY (RESERVED). 15 SECTION 313. CARBON COUNTY. 16 PROJECTS ARE AS FOLLOWS: 17 (1) SR 80, INSTALL DYNAMIC MESSAGE SIGNS 18 AND CLOSED CIRCUIT TELEVISION CAMERAS, 19 I-80 CORRIDOR, ROUND 1, VARIOUS 20 MUNICIPALITIES 420,000 21 (BASE PROJECT ALLOCATION - $200,000) 22 (DESIGN AND CONTINGENCIES - $220,000) 23 (2) SR 80, INSTALL DYNAMIC MESSAGE SIGNS, 24 CLOSED CIRCUIT TELEVISION CAMERAS, 25 HIGHWAY ADVISORY RADIO AND HIGHWAY 26 ADVISORY RADIO BEACONS, I-80 CORRIDOR, 27 ROUND 2, VARIOUS MUNICIPALITIES 390,000 28 (BASE PROJECT ALLOCATION - $205,000) 29 (DESIGN AND CONTINGENCIES - $185,000) 30 (3) SR 8004, LENGTHEN RAMP, RUMBLE STRIPS, 20080S1504B2377 - 52 -
1 WHITE TOPPING, FLASHING WARNING DEVICE, 2 I-80 OFF RAMP EXTENSION, EAST SIDE 3 BOROUGH 550,000 4 (BASE PROJECT ALLOCATION - $250,000) 5 (LAND ALLOCATION - $150,000) 6 (DESIGN AND CONTINGENCIES - $150,000) 7 (4) SR 80, INSTALLATION OF 0.10 MILEPOST 8 MARKERS ON INTERSTATES AND EXPRESSWAYS, 9 NEPA MILE POST MARKERS, VARIOUS 10 MUNICIPALITIES 304,000 11 (BASE PROJECT ALLOCATION - $13,000) 12 (DESIGN AND CONTINGENCIES - $291,000) 13 (5) I-80, INTERSTATE RESTORATION AND 14 RECONSTRUCTION 9,600,000 15 (BASE PROJECT ALLOCATION - $9,600,000) 16 (6) VARIOUS, REHABILITATION, RESTORATION 17 OR RECONSTRUCTION OF VARIOUS HIGHWAYS 12,175,000 18 (BASE PROJECT ALLOCATION - $9,131,000) 19 (LAND ALLOCATION - $3,044,000) 20 SECTION 314. CENTRE COUNTY. 21 PROJECTS ARE AS FOLLOWS: 22 (1) SR 144, RETAINING WALL RECONSTRUCTION, 23 LINN STREET, SECTION 320, BELLEFONTE 24 BOROUGH 1,400,000 25 (BASE PROJECT ALLOCATION - $1,400,000) 26 (2) SR 26, SAFETY IMPROVEMENT, PINE GROVE 27 MOUNTAIN, FERGUSON TOWNSHIP 260,000 28 (BASE PROJECT ALLOCATION - $210,000) 29 (LAND ALLOCATION - $10,000) 30 (DESIGN AND CONTINGENCIES - $40,000) 20080S1504B2377 - 53 -
1 (3) SR 3018, SAFETY IMPROVEMENT, ATHERTON 2 AND UNIVERSITY DRIVE, STATE COLLEGE 3 BOROUGH 1,175,000 4 (BASE PROJECT ALLOCATION - $1,000,000) 5 (LAND ALLOCATION - $75,000) 6 (DESIGN AND CONTINGENCIES - $100,000) 7 (4) SR 322, SAFETY IMPROVEMENT AND 8 CONGESTION REDUCTION, US 322 CORRIDOR 9 SAFETY IMPROVEMENT, HARRIS AND POTTER 10 TOWNSHIPS 360,000 11 (BASE PROJECT ALLOCATION - $300,000) 12 (LAND ALLOCATION - $10,000) 13 (DESIGN AND CONTINGENCIES - $50,000) 14 (5) SR 350, SAFETY IMPROVEMENT, SR 350 15 CURVE IMPROVEMENT AND TRUCK PULL OFF, 16 RUSH AND TAYLOR TOWNSHIPS 925,000 17 (BASE PROJECT ALLOCATION - $800,00) 18 (LAND ALLOCATION - $25,000) 19 (DESIGN AND CONTINGENCIES - $100,000) 20 (6) SR 45, HIGHWAY RESTORATION, ADD 21 TURNING LANE, TURN LANE AT SR 45 AND SR 22 144, POTTER TOWNSHIP 5,140,000 23 (BASE PROJECT ALLOCATION - $3,640,000) 24 (LAND ALLOCATION - $1,300,000) 25 (DESIGN AND CONTINGENCIES - $200,000) 26 (7) SR 550, ADD THIRD LANE, CONGESTION 27 REDUCTION, PA 550 THIRD SEGMENT 440, 28 BELLEFONTE BOROUGH AND SPRING TOWNSHIP 4,325,000 29 (BASE PROJECT ALLOCATION - $3,245,000) 30 (LAND ALLOCATION - $545,000) 20080S1504B2377 - 54 -
1 (DESIGN AND CONTINGENCIES - $535,000) 2 (8) SR 80, ACID ROCK DISCHARGE MITIGATION, 3 JONATHON RUN, I-80 AND SR 144, BOGGS 4 AND SNOW SHOE TOWNSHIPS 1,320,000 5 (BASE PROJECT ALLOCATION - $1,300,000) 6 (LAND ALLOCATION - $20,000) 7 (9) SR 80, PAVEMENT RESTORATION, 8 REHABILITATION, INTERSTATE IMPROVEMENT, 9 I-80 CORRIDOR, BOGGS, RUSH AND SNOW 10 SHOE TOWNSHIPS 1,530,000 11 (BASE PROJECT ALLOCATION - $1,500,000) 12 (DESIGN AND CONTINGENCIES - $30,000) 13 (10) VARIOUS ROUTES, REGIONAL ITS 14 INITIATIVES, REGIONAL ITS OPERATIONS 15 PLAN, VARIOUS MUNICIPALITIES 500,000 16 (BASE PROJECT ALLOCATION - $500,000) 17 (11) SR 3014, RETIMING AND COORDINATING OF 18 18 SIGNALS, SAFETY IMPROVEMENT, 19 ATHERTON STREET CORRIDOR, VALLEY VISTA 20 TO BEAVER AVENUE, STATE COLLEGE BOROUGH 21 AND FERGUSON AND PATTON TOWNSHIPS 400,000 22 (BASE PROJECT ALLOCATION - $300,000) 23 (LAND ALLOCATION - $25,000) 24 (DESIGN AND CONTINGENCIES - $75,000) 25 (12) I-80, INTERSTATE RESTORATION AND 26 RECONSTRUCTION 31,800,000 27 (BASE PROJECT ALLOCATION - $31,800,000) 28 (13) SR 150, CONGESTED CORRIDOR 29 IMPROVEMENTS, SAFETY IMPROVEMENTS 1,237,000 30 (BASE PROJECT ALLOCATION - $1,143,000) 20080S1504B2377 - 55 -
1 (LAND ALLOCATION - $52,000) 2 (DESIGN AND CONTINGENCIES - $42,000) 3 (14) SR 45, PARK AND RIDE LOT 777,000 4 (BASE PROJECT ALLOCATION - $672,000) 5 (LAND ALLOCATION - $42,000) 6 (DESIGN AND CONTINGENCIES - $63,000) 7 SECTION 315. CHESTER COUNTY. 8 PROJECTS ARE AS FOLLOWS: 9 (1) SR 30, RECONSTRUCTION, US 30, PA 10 TO 10 EXTON BYPASS, VARIOUS MUNICIPALITIES 80,515,000 11 (BASE PROJECT ALLOCATION - $77,200,000) 12 (LAND ALLOCATION - $1,000,000) 13 (DESIGN AND CONTINGENCIES - $2,315,000) 14 (2) SR 1, ADD LANES AND WIDEN TO SIX 15 LANES 3,800,000 16 (BASE PROJECT ALLOCATION - $3,800,000) 17 (3) SR 100, WIDEN AND ADD LANES, TO 18 PROVIDE THREE LANES NORTHBOUND AND 19 SOUTHBOUND 21,586,000 20 (BASE PROJECT ALLOCATION - $21,586,000) 21 (4) SR 29, ADD LANE 5,370,000 22 (BASE PROJECT ALLOCATION - $5,370,000) 23 (5) SR 30, INTERSECTION IMPROVEMENT, ADD 24 TURN LANES, WIDEN AND SIGNALS 700,000 25 (BASE PROJECT ALLOCATION - $700,000) 26 (6) SR 41, RECONSTRUCT - TRANSPORTATION 27 STUDY 10,000,000 28 (BASE PROJECT ALLOCATION - $8,000,000) 29 (LAND ALLOCATION - $2,000,000) 30 (7) SR 52, RELOCATION, NEW ROADWAY 3,800,000 20080S1504B2377 - 56 -
1 (BASE PROJECT ALLOCATION - $3,800,000) 2 (8) US 30, PEDESTRIAN FACILITIES - 3 REALIGNMENT AND WIDENING TO ACCOMMODATE 4 PROPOSED RELOCATION 600,000 5 (LAND ALLOCATION - $600,000) 6 SECTION 316. CLARION COUNTY. 7 PROJECTS ARE AS FOLLOWS: 8 (1) I-81, PREVENTIVE MAINTENANCE, PA 478 9 INTERCHANGE TO SR 3007 INTERCHANGE, 10 CLARION, WEST I-80, MILL AND FILL, 11 BEAVER AND RICHLAND TOWNSHIPS 480,000 12 (BASE PROJECT ALLOCATION - $450,000) 13 (DESIGN AND CONTINGENCIES - $30,000) 14 (2) SR 322, DRAINAGE, CURBING, 15 RESTORATION, US 322 FROM SR 208 TO 16 STATION ROAD, SHIPPENVILLE BOROUGH AND 17 ELK TOWNSHIP 850,000 18 (BASE PROJECT ALLOCATION - $850,000) 19 (3) I-80, INTERSTATE RESTORATION AND 20 RECONSTRUCTION 27,800,000 21 (BASE PROJECT ALLOCATION - $27,800,000) 22 (4) SR 208, SAFETY AND INTERSECTION 23 IMPROVEMENTS - ADD TURNING LANES AND 24 INSTALL A NEW SIGNAL 182,000 25 (BASE PROJECT ALLOCATION - $173,000) 26 (DESIGN AND CONTINGENCIES - $9,000) 27 (5) SR 322, PAVEMENT RECONSTRUCTION AND 28 REHABILITATION 360,000 29 (BASE PROJECT ALLOCATION - $360,000) 30 (6) SR 66, PAVEMENT RECONSTRUCTION AND 20080S1504B2377 - 57 -
1 REHABILITATION 1,580,000 2 (BASE PROJECT ALLOCATION - $1,580,000) 3 SECTION 317. CLEARFIELD COUNTY. 4 PROJECTS ARE AS FOLLOWS: 5 (1) SR 219, REALIGNMENT AND SIGNAL 6 INSTALLATION, INTERSECTION OF SR 219 7 AND SR 119, BRADY TOWNSHIP 225,000 8 (BASE PROJECT ALLOCATION - $160,000) 9 (LAND ALLOCATION - $25,000) 10 (DESIGN AND CONTINGENCIES - $40,000) 11 (2) SR 255, SIGNAL TIMING PROJECT 12 IMPROVEMENTS AT 12 SIGNALIZED 13 INTERSECTIONS, DUBOIS AVENUE FROM 14 DUBOIS STREET TO DUBOIS MALL, SANDY 15 TOWNSHIP AND CITY OF DUBOIS 1,084,000 16 (BASE PROJECT ALLOCATION - $695,000) 17 (LAND ALLOCATION - $286,000) 18 (DESIGN AND CONTINGENCIES - $103,000) 19 (3) SR 53, RESURFACING, SIGNAL, ADD 20 TURNING LANE, NINTH STREET 21 INTERSECTION, SR 53 AND SR 2043, MORRIS 22 TOWNSHIP 800,000 23 (BASE PROJECT ALLOCATION - $650,000) 24 (LAND ALLOCATION - $50,000) 25 (DESIGN AND CONTINGENCIES - $100,000) 26 (4) SR 53, CENTER LINE RUMBLE STRIPS, 27 SAFETY IMPROVEMENT, SR 53 CORRIDOR, 28 VARIOUS MUNICIPALITIES 54,000 29 (BASE PROJECT ALLOCATION - $54,000) 30 (5) VARIOUS ROUTES, REGIONAL ITS 20080S1504B2377 - 58 -
1 INITIATIVES, REGIONAL ITS OPERATIONS 2 PLAN, VARIOUS MUNICIPALITIES 500,000 3 (BASE PROJECT ALLOCATION - $500,000) 4 (6) I-80, INTERSTATE RESTORATION AND 5 RECONSTRUCTION 41,200,000 6 (BASE PROJECT ALLOCATION - $41,200,000) 7 (7) SR 4019, RECONSTRUCTION, REALIGNING OF 8 HOSPITAL AVENUE TO THE WEST 450,000 9 (BASE PROJECT ALLOCATION - $450,000) 10 SECTION 318. CLINTON COUNTY. 11 PROJECTS ARE AS FOLLOWS: 12 (1) SR 220, NEW INTERCHANGE WITH BRIDGE 13 AND SAFETY IMPROVEMENTS, AUCTION ROAD, 14 SR 220, SEGMENT 30 AND SR 2008, SEGMENT 15 50, LAMAR TOWNSHIP 925,000 16 (BASE PROJECT ALLOCATION - $800,000) 17 (LAND ALLOCATION - $25,000) 18 (DESIGN AND CONTINGENCIES - $100,000) 19 (2) VARIOUS ROUTES, REGIONAL ITS 20 INITIATIVES, REGIONAL ITS OPERATIONS 21 PLAN, VARIOUS MUNICIPALITIES 500,000 22 (BASE PROJECT ALLOCATION - $500,00) 23 (3) SR 80, PAVEMENT RESTORATION, 24 REHABILITATION AND BRIDGE PARAPETS, I- 25 80 CORRIDOR, GREENE, LAMAR, MARION AND 26 PORTER TOWNSHIPS 2,530,000 27 (BASE PROJECT ALLOCATION - $2,500,000) 28 (DESIGN AND CONTINGENCIES - $30,000) 29 (4) SR 120, ACCESS ROAD FOR FIRST QUALITY 30 TISSUE PLANT, CASTENEA TOWNSHIP AND 20080S1504B2377 - 59 -
1 LOCK HAVEN CITY 8,750,000 2 (BASE PROJECT ALLOCATION - $8,000,000) 3 (LAND ALLOCATION - $500,000) 4 (DESIGN AND CONTINGENCIES - $250,000) 5 (5) I-80, INTERSTATE RESTORATION AND 6 RECONSTRUCTION 23,500,000 7 (BASE PROJECT ALLOCATION - $23,500,000) 8 SECTION 319. COLUMBIA COUNTY. 9 PROJECTS ARE AS FOLLOWS: 10 (1) SR 11, PAVEMENT RECONSTRUCTION, 11 REHABILITATION, SR 11, SEGMENT 380 TO 12 SEGMENT 431, BERWICK BOROUGH 30,000 13 (DESIGN AND CONTINGENCIES - $30,000) 14 (2) SR 42, CONCRETE AND PAVEMENT 15 RECONSTRUCTION, REHABILITATION, SR 42 16 FROM I-80 INTERCHANGE TO MALL, 17 INCLUDING RAMPS, HEMLOCK TOWNSHIP 1,098,000 18 (BASE PROJECT ALLOCATION - $1,058,000) 19 (DESIGN AND CONTINGENCIES - $40,000) 20 (3) I-80, INTERSTATE RESTORATION AND 21 RECONSTRUCTION 18,800,000 22 (BASE PROJECT ALLOCATION - $18,800,000) 23 (4) SR 1019, RESURFACING, RESTORATION 415,000 24 (BASE PROJECT ALLOCATION - $405,000) 25 (LAND ALLOCATION - $10,000) 26 (5) SR 4009, RESURFACING, RESTORATION 880,000 27 (BASE PROJECT ALLOCATION - $870,000) 28 (LAND ALLOCATION - $10,000) 29 (6) SR 42, RESURFACING, RESTORATION 1,810,000 30 (BASE PROJECT ALLOCATION - $1,800,000) 20080S1504B2377 - 60 -
1 (LAND ALLOCATION - $10,000) 2 (7) SR 42, RESURFACING, RESTORATION 2,270,000 3 (BASE PROJECT ALLOCATION - $2,260,000) 4 (LAND ALLOCATION - $10,000) 5 (8) SR 42, RESURFACING, RESTORATION 1,710,000 6 (BASE PROJECT ALLOCATION - $1,700,000) 7 (LAND ALLOCATION - $10,000) 8 (9) SR 487, RESURFACING, RESTORATION 960,000 9 (BASE PROJECT ALLOCATION - $950,000) 10 (LAND ALLOCATION - $10,000) 11 (10) SR 487, RESURFACING, RESTORATION 910,000 12 (BASE PROJECT ALLOCATION - $900,000) 13 (LAND ALLOCATION - $10,000) 14 SECTION 320. CRAWFORD COUNTY. 15 PROJECTS ARE AS FOLLOWS: 16 (1) I-79, INTERSTATE RESTORATION AND 17 RECONSTRUCTION 27,140,000 18 (BASE PROJECT ALLOCATION - $27,140,000) 19 (2) PA 27, CORRIDOR SAFETY IMPROVEMENT, 20 FLATTEN RELOCATE CURVE 165,000 21 (BASE PROJECT ALLOCATION - $76,000) 22 (LAND ALLOCATION - $11,000) 23 (DESIGN AND CONTINGENCIES - $78,000) 24 (3) SR 198, RELOCATION AND REALIGNMENT, 25 IMPROVE TURNING RADII, SURFACE 26 IMPROVEMENTS AND DRAINAGE 480,000 27 (BASE PROJECT ALLOCATION - $400,000) 28 (LAND ALLOCATION - $52,000) 29 (DESIGN AND CONTINGENCIES - $28,000) 30 (4) SR 6, CONCRETE PAVEMENT RESTORATION 20080S1504B2377 - 61 -
1 AND OVERLAY 1,533,000 2 (BASE PROJECT ALLOCATION - $1,533,000) 3 SECTION 321. CUMBERLAND COUNTY. 4 PROJECTS ARE AS FOLLOWS: 5 (1) I-81, INTERSTATE RESTORATION AND 6 RECONSTRUCTION 38,200,000 7 (BASE PROJECT ALLOCATION - $38,200,000) 8 (2) I-83, INTERSTATE RESTORATION AND 9 RECONSTRUCTION 1,700,000 10 (BASE PROJECT ALLOCATION - $1,700,000) 11 (3) SR 465, INTERCHANGE IMPROVEMENT 10,411,000 12 (BASE PROJECT ALLOCATION - $10,411,000) 13 SECTION 322. DAUPHIN COUNTY. 14 PROJECTS ARE AS FOLLOWS: 15 (1) SR 83, WIDEN, ADD LANE, INTERCHANGE 16 IMPROVEMENT, RECONSTRUCT, I-83, EAST 17 SHORE, SECTION 1 FROM EISENHOWER 18 INTERCHANGE TO I-81, LOWER PAXTON, 19 SUSQUEHANNA AND SWATARA TOWNSHIPS 2,062,000 20 (LAND ALLOCATION - $1,262,000) 21 (DESIGN AND CONTINGENCIES - $800,000) 22 (2) I-283, INTERSTATE RESTORATION AND 23 RECONSTRUCTION 2,500,000 24 (BASE PROJECT ALLOCATION - $2,500,000) 25 (3) I-81, INTERSTATE RESTORATION AND 26 RECONSTRUCTION 16,000,000 27 (BASE PROJECT ALLOCATION - $16,000,000) 28 (4) I-83, INTERSTATE RESTORATION AND 29 RECONSTRUCTION 8,400,000 30 (BASE PROJECT ALLOCATION - $8,400,000) 20080S1504B2377 - 62 -
1 (5) SR 422, INTERSECTION IMPROVEMENTS, 2 WIDEN, ADD TURNING LANES AND TRAFFIC 3 SIGNALS 6,193,000 4 (BASE PROJECT ALLOCATION - $3,836,000) 5 (DESIGN AND CONTINGENCIES - $2,357,000) 6 SECTION 323. DELAWARE COUNTY. 7 PROJECTS ARE AS FOLLOWS: 8 (1) SR 2028, CHANNELIZATION AND VERTICAL 9 CLEAR IMPROVEMENTS, CORRIDOR SAFETY 10 IMPROVEMENT, NEW TRAFFIC SIGNAL, 11 CHESTNUT STREET AND MORTON AVENUE, 10TH 12 TO 12TH STREETS, CITY OF CHESTER 1,300,000 13 (BASE PROJECT ALLOCATION - $1,000,000) 14 (LAND ALLOCATION - $60,000) 15 (DESIGN AND CONTINGENCIES - $240,000) 16 (2) SR 3018, NEW ROADWAY, BRIDGEWATER ROAD 17 EXTENSION, BROOKHAVEN BOROUGH AND ASTON 18 TOWNSHIP 2,040,000 19 (BASE PROJECT ALLOCATION - $1,800,000) 20 (LAND ALLOCATION - $240,000) 21 (3) I-476, INTERSTATE RESTORATION AND 22 RECONSTRUCTION 14,000,000 23 (BASE PROJECT ALLOCATION - $14,000,000) 24 (4) I-95, INTERSTATE RESTORATION AND 25 RECONSTRUCTION 11,000,000 26 (BASE PROJECT ALLOCATION - $11,000,000) 27 SECTION 324. ELK COUNTY. 28 PROJECTS ARE AS FOLLOWS: 29 (1) SR 255, HIGHWAY RESTORATION, DRAINAGE, 30 GUIDE RAIL AND CONCRETE PAVEMENT 20080S1504B2377 - 63 -
1 RECONSTRUCTION, REHABILITATION, SR 255, 2 MILLION DOLLAR HIGHWAY, SEGMENT 0230 TO 3 SEGMENT 0280, CITY OF ST. MARYS 4,915,000 4 (BASE PROJECT ALLOCATION - $4,785,000) 5 (LAND ALLOCATION - $50,000) 6 (DESIGN AND CONTINGENCIES - $80,000) 7 (2) SR 255, UPDATE SIGNALS, SAFETY 8 IMPROVEMENT, VINE AND ARCH STREET 9 SIGNALS, CITY OF ST. MARYS 175,000 10 (BASE PROJECT ALLOCATION - $100,000) 11 (LAND ALLOCATION - $25,000) 12 (DESIGN AND CONTINGENCIES - $50,000) 13 SECTION 325. ERIE COUNTY. 14 PROJECTS ARE AS FOLLOWS: 15 (1) SR 19, INTERSECTION IMPROVEMENTS, 16 WATERFORD AT SR 19 AND SR 97, WATERFORD 17 BOROUGH AND WATERFORD TOWNSHIP 335,000 18 (BASE PROJECT ALLOCATION - $200,000) 19 (LAND ALLOCATION - $60,000) 20 (DESIGN AND CONTINGENCIES - $75,000) 21 (2) SR 8, SAFETY IMPROVEMENT STUDY, SR 8, 22 PARADE STREET AT 28TH STREET 23 INTERSECTION, CITY OF ERIE 200,000 24 (BASE PROJECT ALLOCATION - $100,00) 25 (LAND ALLOCATION - $20,000) 26 (DESIGN AND CONTINGENCIES - $80,000) 27 (3) VARIOUS ROUTES, CONSTRUCTION AND 28 COORDINATION OF AN ITS COMMAND CENTER, 29 ERIE ITS INITIATIVE, VARIOUS 30 MUNICIPALITIES 300,000 20080S1504B2377 - 64 -
1 (BASE PROJECT ALLOCATION - $200,00) 2 (DESIGN AND CONTINGENCIES - $100,000) 3 (4) I-79, INTERSTATE RESTORATION AND 4 RECONSTRUCTION 19,000,000 5 (BASE PROJECT ALLOCATION - $19,000,000) 6 (5) I-86, INTERSTATE RESTORATION AND 7 RECONSTRUCTION 6,500,000 8 (BASE PROJECT ALLOCATION - $6,500,000) 9 (6) I-90, INTERSTATE RESTORATION AND 10 RECONSTRUCTION 46,000,000 11 (BASE PROJECT ALLOCATION - $46,000,000) 12 SECTION 326. FAYETTE COUNTY. 13 PROJECTS ARE AS FOLLOWS: 14 (1) SR 119, HIGHWAY RESTORATION, SR 119 15 FROM EVERSON TO WEST COUNTY LINE, 16 BULLSKIN AND UPPER TYRONE TOWNSHIPS 5,100,000 17 (BASE PROJECT ALLOCATION - $5,100,000) 18 (2) SR 166, EXISTING SIGNAL IMPROVEMENT, 19 SR 166 AT NEW SALEM ROAD, LUZERNE 20 TOWNSHIP 290,000 21 (BASE PROJECT ALLOCATION - $150,000) 22 (LAND ALLOCATION - $40,000) 23 (DESIGN AND CONTINGENCIES - $100,000) 24 (3) SR 21, HIGHWAY RESTORATION, SR 21 FROM 25 FOOTDALE ROAD TO DUCK HOLLOW ROAD, 26 GERMAN, MENALLEN AND SOUTH UNION 27 TOWNSHIPS 3,000,000 28 (BASE PROJECT ALLOCATION - $3,000,000) 29 (4) SR 40, HIGHWAY RESTORATION, SR 40 FROM 30 FARMINGTON TO DINNERBELL ROAD, WHARTON 20080S1504B2377 - 65 -
1 TOWNSHIP 3,200,000 2 (BASE PROJECT ALLOCATION - $3,200,000) 3 (5) SR 51, HIGHWAY RESTORATION, SR 51 FROM 4 SR 4046 TO WESTMORELAND COUNTY LINE, 5 PERRYOPOLIS BOROUGH AND PERRY TOWNSHIP 5,200,000 6 (BASE PROJECT ALLOCATION - $5,200,000) 7 (6) SR 88, HIGHWAY RECONSTRUCTION, MAIN 8 STREET, POINT MARION, POINT MARION 9 BOROUGH 458,000 10 (BASE PROJECT ALLOCATION - $200,000) 11 (LAND ALLOCATION - $58,000) 12 (DESIGN AND CONTINGENCIES - $200,000) 13 (7) SR 119, EXISTING SIGNAL IMPROVEMENT 537,000 14 (BASE PROJECT ALLOCATION - $433,000) 15 (DESIGN AND CONTINGENCIES - $104,000) 16 (8) SR 21, INTERSECTION IMPROVEMENT, ADD 17 TURNING LANES 206,000 18 (BASE PROJECT ALLOCATION - $109,000) 19 (LAND ALLOCATION - $42,000) 20 (DESIGN AND CONTINGENCIES - $55,000) 21 (9) SR 40, INTERSECTION IMPROVEMENT 284,000 22 (BASE PROJECT ALLOCATION - $226,000) 23 (LAND ALLOCATION - $26,000) 24 (DESIGN AND CONTINGENCIES - $32,000) 25 (10) SR 711, TRUCK TRAFFIC STUDY, 26 RESTORATION OR NEW TRUCK PULL-OFFS AND 27 ESCAPE RAMP, POSSIBLE RELOCATIONS TRUCK 28 TRAFFIC 2,926,000 29 (BASE PROJECT ALLOCATION - $2,250,000) 30 (LAND ALLOCATION - $416,000) 20080S1504B2377 - 66 -
1 (DESIGN AND CONTINGENCIES - $260,000) 2 SECTION 327. FOREST COUNTY. 3 PROJECTS ARE AS FOLLOWS: 4 (1) SR 66, HIGHWAY RESTORATION 611,000 5 (BASE PROJECT ALLOCATION - $611,000) 6 SECTION 328. FRANKLIN COUNTY. 7 PROJECTS ARE AS FOLLOWS: 8 (1) SR 11, INTERSECTION IMPROVEMENTS, 9 WIDENING, TURNING LANES, SIGNAL UPDATES 10 AND RESURFACING, ANTRIM WAY 11 INTERSECTION, US 11 AND PA 16, 12 GREENCASTLE BOROUGH AND ANTRIM 13 TOWNSHIP 1,725,000 14 (BASE PROJECT ALLOCATION - $1,725,000) 15 (2) ROUTE 11, INTERSECTION IMPROVEMENT OF 16 ROUTE 11 AND ROUTE 997, GREENE 17 TOWNSHIP 1,200,000 18 (3) I-81, INTERSTATE RESTORATION AND 19 RECONSTRUCTION 25,000,000 20 (BASE PROJECT ALLOCATION - $25,000,000) 21 SECTION 329. FULTON COUNTY. 22 PROJECTS ARE AS FOLLOWS: 23 (1) SR 16, INTERSECTION AND TURN LANE 24 IMPROVEMENT, PA 6 AND JLG DRIVE, AYR 25 TOWNSHIP 170,000 26 (BASE PROJECT ALLOCATION - $170,000) 27 (2) SR 522, INTERSECTION AND CURVE 28 IMPROVEMENTS, SAFETY IMPROVEMENT, US 29 522 FROM TIMBER RIDGE ROAD, SR 2005, TO 30 SOUTH OF GEM ROAD, SR 2003, BELFAST 20080S1504B2377 - 67 -
1 TOWNSHIP 700,000 2 (BASE PROJECT ALLOCATION - $600,000) 3 (LAND ALLOCATION - $20,000) 4 (DESIGN AND CONTINGENCIES - $80,000) 5 (3) SR 70, CULVERT REPLACEMENT, DRAINAGE 6 IMPROVEMENT, I-70 OVER TRIBUTARY OF 7 LITTLE TONOLOWAY CREEK, BETHEL 8 TOWNSHIP 605,000 9 (BASE PROJECT ALLOCATION - $500,000) 10 (DESIGN AND CONTINGENCIES - $105,000) 11 (4) SR 70, RESTORATION, REHABILITATION, 12 SAFETY IMPROVEMENTS, I-70 EASTBOUND, 13 BEDFORD COUNTY, AMARANTH, BRUSH CREEK 14 AND UNION TOWNSHIPS 900,000 15 (BASE PROJECT ALLOCATION - $900,000) 16 (5) SR 70, RESTORATION, REHABILITATION, 17 SAFETY IMPROVEMENTS, I-70 AMARANTH TO 18 MARYLAND LINE, BETHEL, BRUSH CREEK AND 19 UNION TOWNSHIPS 1,420,000 20 (BASE PROJECT ALLOCATION - $1,420,000) 21 (6) I-70, INTERSTATE RESTORATION AND 22 RECONSTRUCTION 19,600,000 23 (BASE PROJECT ALLOCATION - $19,600,000) 24 (7) SR 30, CONCRETE PAVEMENT RESTORATION 25 AND OVERLAY 3,600,000 26 (BASE PROJECT ALLOCATION - $3,600,000) 27 SECTION 330. GREENE COUNTY. 28 PROJECTS ARE AS FOLLOWS: 29 (1) SR 21, HIGHWAY RESTORATION, PA 21 FROM 30 SR 4017 TO PA 18, CENTER TOWNSHIP 4,700,000 20080S1504B2377 - 68 -
1 (BASE PROJECT ALLOCATION - $4,700,000) 2 (2) SR 21, HIGHWAY RESTORATION, SR 21 FROM 3 JUNCTION DELI TO PAISLEY, CUMBERLAND 4 AND MONONGAHELA TOWNSHIPS 3,500,000 5 (BASE PROJECT ALLOCATION - $3,500,000) 6 (3) SR 21, HIGHWAY RESTORATION, SR 21 FROM 7 PAISLEY TO MASONTOWN BRIDGE, CUMBERLAND 8 AND MONONGAHELA TOWNSHIPS 4,800,000 9 (BASE PROJECT ALLOCATION - $4,800,000) 10 (4) SR 79, INTERSTATE RECONSTRUCTION, I-79 11 NO.2 FROM MILEPOST 0 TO MILEPOST 14, 12 FRANKLIN AND WHITELEY TOWNSHIPS 3,255,000 13 (BASE PROJECT ALLOCATION - $3,000,000) 14 (DESIGN AND CONTINGENCIES - $255,000) 15 (5) SR 79, CONCRETE PAVEMENT 16 RECONSTRUCTION, REHABILITATION, I-79 17 NO.1 FROM MILEPOST 0 TO MILEPOST 14, 18 FRANKLIN, PERRY AND WHITELEY TOWNSHIPS 3,000,000 19 (BASE PROJECT ALLOCATION - $2,500,000) 20 (DESIGN AND CONTINGENCIES - $500,000) 21 (6) SR 79, RESURFACING, SMOOTHER ROADS, I- 22 79, FRANKLIN, WASHINGTON AND WHITELEY 23 TOWNSHIPS 12,750,000 24 (BASE PROJECT ALLOCATION - $12,750,000) 25 (7) SR 79, RECONSTRUCTION OF MAINLINE, I- 26 79, SEGMENT 0174 TO SEGMENT 0210 AND 27 SEGMENT 0175 TO SEGMENT 0211, 28 WASHINGTON TOWNSHIP 1,680,000 29 (BASE PROJECT ALLOCATION - $1,500,000) 30 (DESIGN AND CONTINGENCIES - $180,000) 20080S1504B2377 - 69 -
1 (8) SR 79, INTERSTATE RECONSTRUCTION, I- 2 79, SEGMENT 0064 TO SEGMENT 0114 AND 3 SEGMENT 0065 TO SEGMENT 0115, IN AREA 4 OF LONGWALL MINING, FRANKLIN AND 5 WHITELEY TOWNSHIPS 2,800,000 6 (BASE PROJECT ALLOCATION - $2,600,000) 7 (DESIGN AND CONTINGENCIES - $200,000) 8 (9) SR 88, HIGHWAY RESTORATION, SR 88 FROM 9 POINT MARION TO DILLINER, DUNKARD AND 10 MONONGAHELA TOWNSHIPS 4,300,000 11 (BASE PROJECT ALLOCATION - $4,300,000) 12 (10) I-79, INTERSTATE RESTORATION AND 13 RECONSTRUCTION 21,400,000 14 (BASE PROJECT ALLOCATION - $21,400,000) 15 (11) SR 21, HIGHWAY RECONSTRUCTION 3,000,000 16 (BASE PROJECT ALLOCATION - $3,000,000) 17 SECTION 331. HUNTINGDON COUNTY. 18 PROJECTS ARE AS FOLLOWS: 19 (1) SR 26, TWO-LANE RELOCATION BYPASS, SR 20 26 FROM PA 305 TO NEAR SAWMILL ROAD, T- 21 528, JACKSON TOWNSHIP 2,285,000 22 (BASE PROJECT ALLOCATION - $1,700,000) 23 (LAND ALLOCATION - $94,000) 24 (DESIGN AND CONTINGENCIES - $491,000) 25 (2) PA 26, SLIDE AND SINK HOLE REPAIR 26 UNDER ROADWAY, REPLACE EMBANKMENT AND 27 ROADWAY STRUCTURE 865,000 28 (BASE PROJECT ALLOCATION - $865,000) 29 (3) SR 3001, RESTORATION, WIDEN AND 30 OVERLAY 6,210,000 20080S1504B2377 - 70 -
1 (BASE PROJECT ALLOCATION - $5,200,000) 2 (LAND ALLOCATION - $600,000) 3 (DESIGN AND CONTINGENCIES - $410,000) 4 (4) SR 453, RESTORATION, REHABILITATION 5 AND TRUCK CLIMBING LANE 8,003,000 6 (BASE PROJECT ALLOCATION - $8,003,000) 7 (5) SR 655, RECONSTRUCTION, UTILITY 8 RELOCATION AND DRAINAGE IMPROVEMENT 600,000 9 (BASE PROJECT ALLOCATION - $600,000) 10 SECTION 332. INDIANA COUNTY. 11 PROJECTS ARE AS FOLLOWS: 12 (1) SR 119, SIGN STRUCTURE, BRIDGE 13 EXPANSION, DAM REPLACEMENT, WHITE 14 TOWNSHIP 6,000 15 (BASE PROJECT ALLOCATION - $5,000) 16 (DESIGN AND CONTINGENCIES - $1,000) 17 (2) SR 217, INTERSECTION AND SAFETY 18 IMPROVEMENTS, PA 217 AND SR 3009, 19 NEWPORT ROAD INTERSECTION, BURRELL 20 TOWNSHIP 72,000 21 (BASE PROJECT ALLOCATION - $60,000) 22 (LAND ALLOCATION - $12,000) 23 (3) SR 22, HIGHWAY RESTORATION AND 24 RESURFACING, ARMAGH BYPASS EAST, SR 22 25 FROM PA 56 TO PA 403, EAST WHEATFIELD 26 TOWNSHIP 640,000 27 (BASE PROJECT ALLOCATION - $600,000) 28 (DESIGN AND CONTINGENCIES - $40,000) 29 (4) SR 22, HIGHWAY RESTORATION AND 30 RESURFACING, ARMAGH BYPASS WEST, T-893, 20080S1504B2377 - 71 -
1 MCCLAIN HILL ROAD, TO PA 56 2 INTERCHANGE, EAST WHEATFIELD TOWNSHIP 640,000 3 (BASE PROJECT ALLOCATION - $600,000) 4 (DESIGN AND CONTINGENCIES - $40,000) 5 (5) SR 3011, REESTABLISH RAILROAD 6 CROSSING, BLACKLICK RAILROAD CROSSING, 7 NEAR INTERSECTION OF SR 3011 AND US 8 119, BURRELL TOWNSHIP 120,000 9 (BASE PROJECT ALLOCATION - $120,000) 10 (6) SR 422, PREVENTIVE MAINTENANCE, 11 RESURFACE, US 422 FROM US 119 EAST TO 12 PA 954, CHERRYHILL AND WHITE TOWNSHIPS 168,000 13 (BASE PROJECT ALLOCATION - $168,000) 14 (7) SR 3013, CORRIDOR SAFETY IMPROVEMENT, 15 INTERSECTION RECONSTRUCTION 94,000 16 (BASE PROJECT ALLOCATION - $94,000) 17 (8) SR 119, PAVEMENT RECONSTRUCTION AND 18 REHABILITATION 1,200,000 19 (BASE PROJECT ALLOCATION - $1,200,000) 20 (9) SR 422, PAVEMENT RECONSTRUCTION AND 21 REHABILITATION 840,000 22 (BASE PROJECT ALLOCATION - $840,000) 23 (10) SR 422, PAVEMENT RECONSTRUCTION AND 24 REHABILITATION 1,000,000 25 (BASE PROJECT ALLOCATION - $1,000,000) 26 (11) SR 422, PAVEMENT RECONSTRUCTION AND 27 REHABILITATION 480,000 28 (BASE PROJECT ALLOCATION - $480,000) 29 SECTION 333. JEFFERSON COUNTY. 30 PROJECTS ARE AS FOLLOWS: 20080S1504B2377 - 72 -
1 (1) SR 28, HIGHWAY RESTORATION, SR 28 FROM 2 SR 28/36/322 INTERSECTION TO 1.5 MILES 3 SOUTH OF INTERSECTION, BROOKVILLE 4 BOROUGH AND ROSE TOWNSHIP 510,000 5 (BASE PROJECT ALLOCATION - $450,000) 6 (LAND ALLOCATION - $40,000) 7 (DESIGN AND CONTINGENCIES - $20,000) 8 (2) SR 80, INTERSTATE RESTORATION, 9 REHABILITATION, I-80, SEGMENT 775 TO 10 SEGMENT 841 AND SEGMENT 774 TO SEGMENT 11 840, BROOKVILLE BOROUGH, PINE CREEK AND 12 ROSE TOWNSHIPS 2,770,000 13 (BASE PROJECT ALLOCATION - $2,700,000) 14 (DESIGN AND CONTINGENCIES - $70,000) 15 (3) SR 80, INTERSTATE RESTORATION, 16 REHABILITATION, WEST I-80, SEGMENT 841 17 TO SEGMENT 881 AND SEGMENT 840 TO 18 SEGMENT 880, ROSE AND UNION TOWNSHIPS 320,000 19 (BASE PROJECT ALLOCATION - $300,000) 20 (DESIGN AND CONTINGENCIES - $20,000) 21 (4) I-80, INTERSTATE RESTORATION AND 22 RECONSTRUCTION 23,600,000 23 (BASE PROJECT ALLOCATION - $23,600,000) 24 (5) SR 219, PAVEMENT RECONSTRUCTION AND 25 REHABILITATION 140,000 26 (BASE PROJECT ALLOCATION - $140,000) 27 (6) US 119, FLATTEN THE EXISTING SHARP 28 HORIZONTAL CURVE, ADD LEFT-TURN STANDBY 29 LANES AND IMPROVE INTERSECTION SIGHT 30 DISTANCE 458,000 20080S1504B2377 - 73 -
1 (BASE PROJECT ALLOCATION - $146,000) 2 (DESIGN AND CONTINGENCIES - $312,000) 3 (7) VARIOUS, SAFETY, CONGESTION RELIEF, 4 ADD TURNING LANE, EXISTING SIGNAL 5 IMPROVEMENT 325,000 6 (LAND ALLOCATION - $325,000) 7 SECTION 334. JUNIATA COUNTY. 8 PROJECTS ARE AS FOLLOWS: 9 (1) SR 1007, RECONSTRUCTION, SR 1007 FROM 10 IRVING STREET TO UNION BOULEVARD AND 11 AIRPORT ROAD TO LLOYD STREET, TUSCARORA 12 TOWNSHIP 110,000 13 (BASE PROJECT ALLOCATION - $75,000) 14 (LAND ALLOCATION - $10,000) 15 (DESIGN AND CONTINGENCIES - $25,000) 16 (2) SR 3002, CENTER TURN LANE, SAFETY 17 IMPROVEMENT, INTERSECTION OF SR 3002 18 AND SR 3005, FERMANAGH AND WALKER 19 TOWNSHIPS 180,000 20 (BASE PROJECT ALLOCATION - $120,000) 21 (LAND ALLOCATION - $10,000) 22 (DESIGN AND CONTINGENCIES - $50,000) 23 (3) SR 35, SR 4005, REMOVAL OF A HOUSE AT 24 THE INTERSECTION, SAFETY IMPROVEMENT, 25 SR 35 AND BLACK LOG ROAD, SR 4005, 26 TUSCARORA TOWNSHIP 22,000 27 (BASE PROJECT ALLOCATION - $5,000) 28 (LAND ALLOCATION - $15,000) 29 (DESIGN AND CONTINGENCIES - $2,000) 30 SECTION 335. LACKAWANNA COUNTY. 20080S1504B2377 - 74 -
1 PROJECTS ARE AS FOLLOWS: 2 (1) SR 1012, INTERSECTION IMPROVEMENT, 3 KENNEDY DRIVE AND COUNTY ROAD 4 INTERSECTION, ARCHBALD BOROUGH 120,000 5 (BASE PROJECT ALLOCATION - $120,000) 6 (2) SR 81, RESTORATION, I-81 NORTHBOUND 7 AND SOUTHBOUND CONCRETE GRINDING, 8 DUNMORE BOROUGH, CITY OF SCRANTON 270,000 9 (BASE PROJECT ALLOCATION - $190,000) 10 (DESIGN AND CONTINGENCIES - $80,000) 11 (3) SR 81, SR 84, ITS IMPROVEMENTS AND 12 PURCHASES, I-81 CORRIDOR, I-84 13 CORRIDOR, I-380 CORRIDOR, US 6 14 CORRIDOR, VARIOUS MUNICIPALITIES 700,000 15 (BASE PROJECT ALLOCATION - $600,000) 16 (DESIGN AND CONTINGENCIES - $100,000) 17 (4) I-380, INTERSTATE RESTORATION AND 18 RECONSTRUCTION 10,400,000 19 (BASE PROJECT ALLOCATION - $10,400,000) 20 (5) I-81, INTERSTATE RESTORATION AND 21 RECONSTRUCTION 26,400,000 22 (BASE PROJECT ALLOCATION - $26,400,000) 23 (6) I-84, INTERSTATE RESTORATION AND 24 RECONSTRUCTION 12,100,000 25 (BASE PROJECT ALLOCATION - $12,100,000) 26 (7) SR 435, SAFETY AND INTERSECTION 27 IMPROVEMENTS 271,000 28 (BASE PROJECT ALLOCATION - $271,000) 29 (8) SR 11, NEW TRAFFIC SIGNAL 86,000 30 (LAND ALLOCATION - $65,000) 20080S1504B2377 - 75 -
1 (DESIGN AND CONTINGENCIES - $21,000) 2 (9) SR 502, ROADWAY AND SLOPE REPAIRS 400,000 3 (BASE PROJECT ALLOCATION - $336,000) 4 (LAND ALLOCATION - $44,000) 5 (DESIGN AND CONTINGENCIES - $20,000) 6 (10) SR 84, PIPE REPLACEMENT 107,000 7 (BASE PROJECT ALLOCATION - $100,000) 8 (LAND ALLOCATION - $7,000) 9 SECTION 336. LANCASTER COUNTY. 10 PROJECTS ARE AS FOLLOWS: 11 (1) SR 222, PAVE SHOULDERS, BASE REPAIR, 12 PAVEMENT RECONSTRUCTION, 13 REHABILITATION, US 222 FROM NORTH OF US 14 322 TO COUNTY LINE, BRECKNOCK, EAST 15 COCALICO AND EPHRATA TOWNSHIPS 2,395,000 16 (BASE PROJECT ALLOCATION - $2,280,000) 17 (LAND ALLOCATION - $50,000) 18 (DESIGN AND CONTINGENCIES - $65,000) 19 (2) SR 222, STRUCTURAL OVERLAY, RESURFACE, 20 SHOULDER IMPROVEMENT, US 222 FROM NORTH 21 OF BUSHONG ROAD TO US 322, EPHRATA, 22 MANHEIM, WARWICK AND WEST EARL 23 TOWNSHIPS 3,515,000 24 (BASE PROJECT ALLOCATION - $3,400,000) 25 (LAND ALLOCATION - $50,000) 26 (DESIGN AND CONTINGENCIES - $65,000) 27 (3) SR 222, SHOULDERS, INTERSECTION, BASE 28 REPAIR, DRAINAGE, STRUCTURE OVERLAY, 29 BEAVER VALLEY PIKE, US 222 FROM 30 QUARRYVILLE TO WILLOW STREET, 20080S1504B2377 - 76 -
1 QUARRYVILLE BOROUGH, PROVIDENCE, 2 STRASBURG AND WEST LAMPETER TOWNSHIPS 1,640,000 3 (BASE PROJECT ALLOCATION - $1,500,000) 4 (LAND ALLOCATION - $100,000) 5 (DESIGN AND CONTINGENCIES - $40,000) 6 (4) SR 30, CONCRETE PAVEMENT 7 RECONSTRUCTION, REHABILITATION, US 30 8 FROM PA 283 TO EAST OF US 222, EAST 9 LAMPETER AND MANHEIM TOWNSHIPS, CITY OF 10 LANCASTER 4,048,000 11 (BASE PROJECT ALLOCATION - $3,978,000) 12 (LAND ALLOCATION - $20,000) 13 (DESIGN AND CONTINGENCIES - $50,000) 14 (5) SR 30, ADD TURNING LANE, CORRIDOR 15 SAFETY, SINGLE AND INTERSECTION 16 IMPROVEMENTS, LINCOLN HIGHWAY CORRIDOR 17 FROM PA 41 TO PA 772, SALISBURY 18 TOWNSHIP 1,170,000 19 (BASE PROJECT ALLOCATION - $750,000) 20 (LAND ALLOCATION - $200,000) 21 (DESIGN AND CONTINGENCIES - $220,000) 22 (6) SR 23, TRANSPORTATION STUDY 578,000 23 (LAND ALLOCATION - $578,000) 24 SECTION 337. LAWRENCE COUNTY. 25 PROJECTS ARE AS FOLLOWS: 26 (1) SR 1012, CONCRETE REHABILITATION, 27 RECONSTRUCT AND BITUMINOUS OVERLAY, 28 FREW MILL ROAD FROM BRIDGE OVER BIG RUN 29 TO YOUNG ROAD, SHENANGO AND SLIPPERY 30 ROCK TOWNSHIPS 2,700,000 20080S1504B2377 - 77 -
1 (BASE PROJECT ALLOCATION - $2,700,000) 2 (2) SR 108, CONCRETE PAVEMENT 3 RECONSTRUCTION, REHABILITATION, 4 HARLANSBURG ROAD FROM SR 388 TO BROWN 5 ROAD, HICKORY AND SCOTT TOWNSHIPS 1,391,000 6 (BASE PROJECT ALLOCATION - $1,264,000) 7 (DESIGN AND CONTINGENCIES - $127,000) 8 (3) SR 108, CONCRETE REHABILITATION, 9 RECONSTRUCT AND BITUMINOUS OVERLAY, 10 HARLANSBURG ROAD FROM CASCADE STREET TO 11 SR 388, HICKORY TOWNSHIP, CITY OF NEW 12 CASTLE 923,000 13 (BASE PROJECT ALLOCATION - $923,000) 14 (4) SR 168, CONCRETE REHABILITATION, 15 RECONSTRUCT AND BITUMINOUS OVERLAY, 16 EASTBROOK ROAD FROM SR 18 TO INDUSTRIAL 17 BOULEVARD, NORTH BEAVER AND TAYLOR 18 TOWNSHIPS 3,000,000 19 (BASE PROJECT ALLOCATION - $3,000,000) 20 (5) SR 168, CONCRETE REHABILITATION, 21 RECONSTRUCT AND BITUMINOUS OVERLAY, 22 THIRD STREET FROM INDUSTRIAL BOULEVARD 23 TO CHERRY STREET, TAYLOR TOWNSHIP 2,001,000 24 (BASE PROJECT ALLOCATION - $2,001,000) 25 (6) SR 18, UPGRADE AND COORDINATE 9 26 SIGNALS, SAFETY IMPROVEMENT, SR 18 IN 27 NEW CASTLE BUSINESS DISTRICT FROM GRANT 28 AVENUE TO MAHONING AVENUE AND MORAVIA 29 STREET, CITY OF NEW CASTLE 25,000 30 (DESIGN AND CONTINGENCIES - $25,000) 20080S1504B2377 - 78 -
1 (7) SR 19, RESURFACING RESTORATION, PERRY 2 HIGHWAY FROM SR 108 TO SR 1015, SCOTT 3 AND WASHINGTON TOWNSHIPS 2,700,000 4 (BASE PROJECT ALLOCATION - $2,700,000) 5 (8) SR 19, CONCRETE PAVEMENT 6 RECONSTRUCTION, REHABILITATION, PERRY 7 HIGHWAY FROM SR 1018 TO MERCER COUNTY 8 LINE, WASHINGTON TOWNSHIP 1,173,000 9 (BASE PROJECT ALLOCATION - $1,066,000) 10 (DESIGN AND CONTINGENCIES - $107,000) 11 (9) SR 2032, CONCRETE PAVEMENT 12 RECONSTRUCTION, REHABILITATION, CHERRY 13 STREET FROM SR 18 TO SR 168, CITY OF 14 NEW CASTLE 1,100,000 15 (BASE PROJECT ALLOCATION - $1,000,000) 16 (DESIGN AND CONTINGENCIES - $100,000) 17 (10) SR 351, SAFETY IMPROVEMENT, SR 351 18 FROM ELLWOOD CITY, 5TH STREET TO 9TH 19 STREET, ELLWOOD CITY BOROUGH 233,000 20 (BASE PROJECT ALLOCATION - $220,000) 21 (DESIGN AND CONTINGENCIES - $13,000) 22 (11) SR 4002, CONCRETE PAVEMENT 23 RECONSTRUCTION, REHABILITATION, SAMPSON 24 STREET FROM INTERSECTION SR 422 AND SR 25 60 TO BEGINNING OF ASPHALT OVERLAY, 26 UNION TOWNSHIP 330,000 27 (BASE PROJECT ALLOCATION - $300,000) 28 (DESIGN AND CONTINGENCIES - $30,000) 29 (12) SR 4005, CONCRETE REHABILITATION, 30 RECONSTRUCT AND BITUMINOUS OVERLAY, 20080S1504B2377 - 79 -
1 RIVER ROAD FROM CHAPIN ROAD TO NASHUA 2 ROAD, NESHANNOCK AND PULASKI TOWNSHIPS 650,000 3 (BASE PROJECT ALLOCATION - $650,000) 4 (13) SR 422, CONCRETE PAVEMENT 5 RECONSTRUCTION, REHABILITATION, BEN 6 FRANKLIN HIGHWAY FROM PINE GLEN ROAD TO 7 ZOCCOLI ROAD, MAHONING AND PULASKI 8 TOWNSHIPS 4,357,000 9 (BASE PROJECT ALLOCATION - $3,961,000) 10 (DESIGN AND CONTINGENCIES - $396,000) 11 (14) SR 422, CONCRETE REHABILITATION, 12 RECONSTRUCT AND BITUMINOUS OVERLAY, BEN 13 FRANKLIN HIGHWAY FROM ZOCCOLI ROAD TO 14 MATHEWS ROAD, MAHONING AND UNION 15 TOWNSHIPS 1,700,000 16 (BASE PROJECT ALLOCATION - $1,700,000) 17 (15) SR 422, REALIGNMENT AND ROADWAY 18 RECONSTRUCTION, FREEDOM ROAD UPGRADE, 19 PHASE A, NEW SEWICKLEY TOWNSHIP 16,000 20 (BASE PROJECT ALLOCATION - $15,000) 21 (DESIGN AND CONTINGENCIES - $1,000) 22 (16) SR 422, CONCRETE PAVEMENT 23 RECONSTRUCTION, REHABILITATION, BEN 24 FRANKLIN HIGHWAY FROM SHENANGO TOWNSHIP 25 LINE TO COPPER ROAD, SHENANGO, SLIPPERY 26 ROCK AND UNION TOWNSHIPS 3,300,000 27 (BASE PROJECT ALLOCATION - $3,300,000) 28 (17) SR 422, CONCRETE PAVEMENT 29 RECONSTRUCTION, REHABILITATION, BEN 30 FRANKLIN HIGHWAY FROM STONER DRIVE TO 20080S1504B2377 - 80 -
1 BRIDGE OVER SLIPPERY ROCK, SLIPPERY 2 ROCK TOWNSHIP 1,980,000 3 (BASE PROJECT ALLOCATION - $1,800,000) 4 (DESIGN AND CONTINGENCIES - $180,000) 5 (18) SR 422, CONCRETE PAVEMENT 6 RECONSTRUCTION, REHABILITATION, BEN 7 FRANKLIN HIGHWAY, NORTHBOUND FROM 8 BRIDGE OVER SLIPPERY ROCK BRIDGE TO 9 BUTLER CITY LINE, SLIPPERY ROCK 10 TOWNSHIP 1,100,000 11 (BASE PROJECT ALLOCATION - $1,000,000) 12 (DESIGN AND CONTINGENCIES - $100,000) 13 (19) SR 422, CONCRETE PAVEMENT 14 RECONSTRUCTION, REHABILITATION, BEN 15 FRANKLIN HIGHWAY, SOUTHBOUND FROM 16 BRIDGE OVER SLIPPERY ROCK BRIDGE TO 17 BUTLER CITY LINE, SLIPPERY ROCK 18 TOWNSHIP 1,100,000 19 (BASE PROJECT ALLOCATION - $1,000,000) 20 (DESIGN AND CONTINGENCIES - $100,000) 21 (20) SR 422, CONCRETE PAVEMENT 22 RECONSTRUCTION, REHABILITATION, BEN 23 FRANKLIN HIGHWAY FROM COPPER ROAD TO 24 STONER DRIVE, SLIPPERY ROCK TOWNSHIP 4,071,000 25 (BASE PROJECT ALLOCATION - $3,701,000) 26 (DESIGN AND CONTINGENCIES - $370,000) 27 (21) SR 422, CONCRETE REHABILITATION, 28 RECONSTRUCTION, SR 422 FROM SR 60 TO 29 TURNPIKE, UNION TOWNSHIP 1,202,000 30 (BASE PROJECT ALLOCATION - $1,095,000) 20080S1504B2377 - 81 -
1 (DESIGN AND CONTINGENCIES - $107,000) 2 (22) SR 422, SR 2004, CONCRETE PAVEMENT 3 RECONSTRUCTION, REHABILITATION, 4 BUSINESS ROUTE 422 AND SR 422 FROM 5 CASCADE STREET TO BUTLER COUNTY LINE, 6 SHENANGO, SLIPPERY ROCK AND UNION 7 TOWNSHIPS, CITY OF NEW CASTLE 3,965,000 8 (BASE PROJECT ALLOCATION - $3,965,000) 9 (23) SR 60, INTERSTATE MAINTENANCE, 10 CONCRETE REHABILITATION, 11 RECONSTRUCTION, SR 60 FROM MERCER 12 COUNTY LINE TO MITCHELL ROAD, 13 NESHANNOCK, PULASKI AND WILMINGTON 14 TOWNSHIPS 1,626,000 15 (BASE PROJECT ALLOCATION - $1,470,000) 16 (DESIGN AND CONTINGENCIES - $156,000) 17 (24) SR 60, INTERSTATE MAINTENANCE, 18 CONCRETE REHABILITATION, 19 RECONSTRUCTION, SR 60 FROM MITCHELL 20 ROAD TO SR 422, NESHANNOCK AND UNION 21 TOWNSHIPS 1,750,000 22 (BASE PROJECT ALLOCATION - $1,656,000) 23 (DESIGN AND CONTINGENCIES - $94,000) 24 (25) SR 79, INTERSTATE MAINTENANCE, 25 RESTORATION AND REHABILITATION I-79 26 CORRIDOR, PLAIN GROVE TOWNSHIP 1,575,000 27 (BASE PROJECT ALLOCATION - $1,500,000) 28 (DESIGN AND CONTINGENCIES - $75,000) 29 (26) I-79, INTERSTATE RESTORATION AND 30 RECONSTRUCTION 5,100,000 20080S1504B2377 - 82 -
1 (BASE PROJECT ALLOCATION - $5,100,000) 2 (27) VARIOUS, SLIDES CORRECTION, RETAINING 3 WALLS 60,000 4 (LAND ALLOCATION - $60,000) 5 (28) VARIOUS, EXISTING SIGNAL IMPROVEMENT 20,000 6 (LAND ALLOCATION - $20,000) 7 SECTION 338. LEBANON COUNTY. 8 PROJECTS ARE AS FOLLOWS: 9 (1) SR 422, CONGESTED CORRIDOR IMPROVEMENT 10 PROGRAM, ADD TURNING LANE, SIGNAL 11 IMPROVEMENT, PEDESTRIAN FACILITIES, SR 12 422 CORRIDOR, PALMYRA BOROUGH TO CLEONA 13 BOROUGH, VARIOUS MUNICIPALITIES 620,000 14 (BASE PROJECT ALLOCATION - $500,000) 15 (LAND ALLOCATION - $20,000) 16 (DESIGN AND CONTINGENCIES - $100,000) 17 (2) I-78, INTERSTATE RESTORATION AND 18 RECONSTRUCTION 8,000,000 19 (BASE PROJECT ALLOCATION - $8,000,000) 20 (3) I-81, INTERSTATE RESTORATION AND 21 RECONSTRUCTION 15,100,000 22 (BASE PROJECT ALLOCATION - $15,100,000) 23 (4) SR 443, BASE AND PAVEMENT RESTORATION 24 AND REHABILITATION, PREVENTIVE 25 MAINTENANCE ON SUBSTRUCTURE OF THREE 26 BRIDGES 3,025,000 27 (BASE PROJECT ALLOCATION - $2,720,000) 28 (LAND ALLOCATION - $275,000) 29 (DESIGN AND CONTINGENCIES - $30,000) 30 SECTION 339. LEHIGH COUNTY. 20080S1504B2377 - 83 -
1 PROJECTS ARE AS FOLLOWS: 2 (1) SR 1004, FOOT DRAINAGE STUDY, LEHIGH 3 AVENUE RETAINING WALL, WHITEHALL 4 TOWNSHIP 450,000 5 (BASE PROJECT ALLOCATION - $100,000) 6 (LAND ALLOCATION - $100,000) 7 (DESIGN AND CONTINGENCIES - $250,000) 8 (2) SR 145, EXCAVATE ROCK, SHOULDER, 9 CORRECT DRAINAGE, SAFETY IMPROVEMENT, 10 SR 145, SEGMENT 260 AND SEGMENT 270, 11 NORTH WHITEHALL TOWNSHIP 400,000 12 (BASE PROJECT ALLOCATION - $100,000) 13 (LAND ALLOCATION - $50,000) 14 (DESIGN AND CONTINGENCIES - $250,000) 15 (3) SR 222, SIGNALIZATION, SAFETY 16 IMPROVEMENT, SR 222 AND SHANTZ ROAD 17 INTERSECTION, UPPER MACUNGIE TOWNSHIP 340,000 18 (BASE PROJECT ALLOCATION - $100,000) 19 (LAND ALLOCATION - $40,000) 20 (DESIGN AND CONTINGENCIES - $200,000) 21 (4) SR 29, CONGESTED CORRIDOR IMPROVEMENT 22 PROGRAM, CORRIDOR SAFETY IMPROVEMENT, 23 CEDAR CREST BOULEVARD CORRIDOR FROM I- 24 78 TO CHESTNUT STREET, VARIOUS 25 MUNICIPALITIES 475,000 26 (BASE PROJECT ALLOCATION - $300,000) 27 (LAND ALLOCATION - $75,000) 28 (DESIGN AND CONTINGENCIES - $100,000) 29 (5) SR 4003, REPLACE HEADWALLS, CONCRETE 30 GUTTER REGRADING AND SET BACK, SAFETY 20080S1504B2377 - 84 -
1 IMPROVEMENT, KERNSVILLE ROAD AT JORDAN 2 ROAD, NORTH WHITEHALL TOWNSHIP 310,000 3 (BASE PROJECT ALLOCATION - $100,000) 4 (LAND ALLOCATION - $40,000) 5 (DESIGN AND CONTINGENCIES - $170,000) 6 (6) SR 78, PROVIDE ROAMING SERVICE PATROL, 7 SAFETY IMPROVEMENT, SR 78 FROM SR 100 8 TO SR 309/145 AND ALONG SR 22 FROM I-78 9 TO SR 33, VARIOUS MUNICIPALITIES 180,000 10 (BASE PROJECT ALLOCATION - $180,000) 11 (7) SR 22, INSTALL DYNAMIC MESSAGE SIGNS, 12 I-78 AND SR 22 CORRIDORS, VARIOUS 13 MUNICIPALITIES 390,000 14 (BASE PROJECT ALLOCATION - $95,000) 15 (LAND ALLOCATION - $15,000) 16 (DESIGN AND CONTINGENCIES - $280,000) 17 (8) SR 22, INSTALLATION OF HIGHWAY 18 ADVISORY RADIO BEACONS, I-78 AND SR 22 19 CORRIDORS, VARIOUS MUNICIPALITIES 300,000 20 (BASE PROJECT ALLOCATION - $100,000) 21 (LAND ALLOCATION - $15,000) 22 (DESIGN AND CONTINGENCIES - $185,000) 23 (9) SR 22, REPLACE 27 EXISTING QUEUE 24 DETECTORS WITH PASSIVE ACOUSTIC 25 SENSORS, SR 22, I-78 AND SR 33 26 CORRIDORS, VARIOUS MUNICIPALITIES 617,000 27 (BASE PROJECT ALLOCATION - $100,000) 28 (DESIGN AND CONTINGENCIES - $517,000) 29 (10) SR 78, REPLACEMENT OF PRECAST 30 PARAPETS, VARIOUS LOCATIONS ON SR 78, 20080S1504B2377 - 85 -
1 SR 22, SR 863, SR 873 AND SR 3007, 2 VARIOUS MUNICIPALITIES 2,690,000 3 (BASE PROJECT ALLOCATION - $150,000) 4 (LAND ALLOCATION - $40,000) 5 (DESIGN AND CONTINGENCIES - $2,500,000) 6 (11) SR 78, INSTALL MEDIAN GUIDE RAIL, 7 SAFETY IMPROVEMENT, I-78 VARIOUS 8 LOCATIONS, VARIOUS MUNICIPALITIES 725,000 9 (BASE PROJECT ALLOCATION - $100,000) 10 (DESIGN AND CONTINGENCIES - $625,000) 11 (12) SR 78, INSTALL CLOSED CIRCUIT 12 TELEVISION CAMERAS, I-78 AND SR 33 13 CORRIDORS, VARIOUS MUNICIPALITIES 265,000 14 (BASE PROJECT ALLOCATION - $125,000) 15 (LAND ALLOCATION - $15,000) 16 (DESIGN AND CONTINGENCIES - $125,000) 17 (13) I-78, INTERSTATE RESTORATION AND 18 RECONSTRUCTION 19,220,000 19 (BASE PROJECT ALLOCATION - $19,220,000) 20 (14) SR 309, WIDEN TO INCORPORATE LEFT 21 TURN LANES AT SIGNALIZED INTERSECTIONS, 22 MEDIAN BARRIER, CROSSWALKS AND SIDEWALK 23 IMPROVEMENTS 336,000 24 (BASE PROJECT ALLOCATION - $336,000) 25 SECTION 340. LUZERNE COUNTY. 26 PROJECTS ARE AS FOLLOWS: 27 (1) SR 11, INTERSECTION IMPROVEMENT, SR 11 28 AND SR 29 INTERSECTION, PLYMOUTH 29 TOWNSHIP 29,000 30 (BASE PROJECT ALLOCATION - $10,000) 20080S1504B2377 - 86 -
1 (LAND ALLOCATION - $4,000) 2 (DESIGN AND CONTINGENCIES - $15,000) 3 (2) SR 115, INSTALL ROCK FENCE, SAFETY 4 IMPROVEMENT, PA 115 FROM TRUCK ESCAPE 5 RAMP TO EAST MOUNTAIN BOULEVARD, PLAINS 6 TOWNSHIP 675,000 7 (BASE PROJECT ALLOCATION - $600,000) 8 (LAND ALLOCATION - $50,000) 9 (DESIGN AND CONTINGENCIES - $25,000) 10 (3) SR 2029, REMOVE EXISTING ABANDONED 11 RAILROAD BRIDGE ABUTMENTS, SAFETY 12 IMPROVEMENT, ABUTMENT REMOVAL, YORK 13 AVENUE AND WOOD STREET, DURYEA BOROUGH 26,000 14 (BASE PROJECT ALLOCATION - $18,000) 15 (LAND ALLOCATION - $8,000) 16 (4) SR 2032, REMOVE EXISTING ABANDONED 17 RAILROAD BRIDGE ABUTMENTS, SAFETY 18 IMPROVEMENT, NEAR THE INTERSECTION OF 19 SR 2030 AND SR 2032, DURYEA AND 20 HUGHESTOWN BOROUGHS 19,000 21 (BASE PROJECT ALLOCATION - $19,000) 22 (5) SR 309, INSTALL ROCK FENCE, SAFETY 23 IMPROVEMENT, PA 309, BROWN STREET, T- 24 433, TO PINE RUN ROAD, SR 2034, 25 FAIRVIEW AND HANOVER TOWNSHIPS 640,000 26 (BASE PROJECT ALLOCATION - $640,000) 27 (6) SR 80, SR 81, SR 309, ITS IMPROVEMENTS 28 AND PURCHASES, I-80 CORRIDOR, I-81 29 CORRIDOR AND PA 309 CORRIDOR, VARIOUS 30 MUNICIPALITIES 700,000 20080S1504B2377 - 87 -
1 (BASE PROJECT ALLOCATION - $600,000) 2 (DESIGN AND CONTINGENCIES - $100,000) 3 (7) SOUTH VALLEY PARKWAY CONNECTING PA 4 ROUTE 29 TO KIRMAR PARKWAY, NANTICOKE, 5 HANOVER AND NEWPORT TOWNSHIPS 65,000,000 6 (BASE PROJECT ALLOCATION - $65,000,000) 7 (8) I-80, INTERSTATE RESTORATION AND 8 RECONSTRUCTION 25,300,000 9 (BASE PROJECT ALLOCATION - $25,300,000) 10 (9) I-81, INTERSTATE RESTORATION AND 11 RECONSTRUCTION 39,100,000 12 (BASE PROJECT ALLOCATION - $39,100,000) 13 (10) NEW ROAD, NEW ACCESS ROAD 3,570,000 14 (BASE PROJECT ALLOCATION - $3,570,000) 15 (11) SR 3046, SOUTH VALLEY PARKWAY, NEW 16 TWO-LANE ROADWAY, NEW INTERCHANGE WITH 17 ROUTE 29, BRIDGE REPLACEMENT, SR 2008, 18 MIDDLE ROAD OVER ROUTE 29 AND BRIDGE 1,755,000 19 (LAND ALLOCATION - $1,404,000) 20 (DESIGN AND CONTINGENCIES - $351,000) 21 (12) SR 115, INTERCHANGE SAFETY 22 IMPROVEMENT 2,662,000 23 (BASE PROJECT ALLOCATION - $1,622,000) 24 (LAND ALLOCATION - $1,040,000) 25 (13) SR 239, RESTORATION 87,000 26 (LAND ALLOCATION - $87,000) 27 (14) SR 6039, CORRIDOR SAFETY IMPROVEMENT, 28 SIGNALS AND WIDENING 267,000 29 (BASE PROJECT ALLOCATION - $267,000) 30 (15) SR 924, RESTORATION AND WIDENING TWO 20080S1504B2377 - 88 -
1 LANES TO FIVE LANES 3,031,000 2 (BASE PROJECT ALLOCATION - $3,031,000) 3 (16) SR 924, RESTORATION AND WIDENING 1,831,000 4 (BASE PROJECT ALLOCATION - $1,831,000) 5 (17) SR 93, RESTORATION AND WIDENING 3,516,000 6 (BASE PROJECT ALLOCATION - $3,516,000) 7 (18) SR 2029, ABUTMENT REMOVAL 8,000 8 (LAND ALLOCATION - $8,000) 9 (19) SR 2032, ABUTMENT REMOVAL 4,000 10 (BASE PROJECT ALLOCATION - $4,000) 11 (20) SR 309, INSTALL ROCK FENCE 640,000 12 (BASE PROJECT ALLOCATION - $640,000) 13 (21) SR 309, RESTORATION, ROADWAY AND 14 RETAINING WALL 430,000 15 (BASE PROJECT ALLOCATION - $430,000) 16 SECTION 341. LYCOMING COUNTY. 17 PROJECTS ARE AS FOLLOWS: 18 (1) SR 15, SAFETY IMPROVEMENT, CENTER TURN 19 LANE US 15 FROM SR 54 TO SOUTH 20 WILLIAMSPORT, ARMSTRONG AND CLINTON 21 TOWNSHIPS 80,000 22 (BASE PROJECT ALLOCATION - $60,000) 23 (DESIGN AND CONTINGENCIES - $20,000) 24 (2) SR 15, HIGHWAY RECONSTRUCTION, SR 15- 25 A10 SECTION, NORTHBOUND, SEGMENT 1350 26 TO SEGMENT 1390, LYCOMING AND OLD 27 LYCOMING TOWNSHIPS 680,000 28 (BASE PROJECT ALLOCATION - $680,000) 29 (3) SR 15, RESURFACE, RECONSTRUCT 30 CONCRETE, SR 15-A10 SECTION, 20080S1504B2377 - 89 -
1 SOUTHBOUND, SEGMENT 1301 TO SEGMENT 2 1391, LYCOMING AND OLD LYCOMING 3 TOWNSHIPS 10,000,000 4 (BASE PROJECT ALLOCATION - $10,000,000) 5 (4) SR 15, RESTORATION, RECONSTRUCT 6 CONCRETE, SR 15-A10 SECTION, 7 NORTHBOUND, SEGMENT 1300 TO SEGMENT 8 1350, OLD LYCOMING TOWNSHIP 5,835,000 9 (BASE PROJECT ALLOCATION - $5,400,000) 10 (DESIGN AND CONTINGENCIES - $435,000) 11 (5) SR 2014, RECONSTRUCTION, BROAD STREET 12 FROM LOYALSOCK CREEK TO MONTOUR STREET, 13 MONTOURSVILLE BOROUGH 370,000 14 (BASE PROJECT ALLOCATION - $350,000) 15 (LAND ALLOCATION - $10,000) 16 (DESIGN AND CONTINGENCIES - $10,000) 17 (6) SR 220, BUILD LOONS, SAFETY 18 IMPROVEMENT, SR 0220 FROM SEGMENT 0200 19 TO SEGMENT 0221, WOODWARD TOWNSHIP 50,000 20 (BASE PROJECT ALLOCATION - $50,000) 21 (7) US 15, RECONSTRUCTION, US 15, PA 220 22 RAMP, CITY OF WILLIAMSPORT 420,000 23 (BASE PROJECT ALLOCATION - $400,000) 24 (LAND ALLOCATION - $10,000) 25 (DESIGN AND CONTINGENCIES - $10,000) 26 (8) I-180, INTERSTATE RESTORATION AND 27 RECONSTRUCTION 19,000,000 28 (BASE PROJECT ALLOCATION - $19,000,000) 29 (9) SR 118, INTERSECTION IMPROVEMENT 520,000 30 (BASE PROJECT ALLOCATION - $520,000) 20080S1504B2377 - 90 -
1 (10) SR 15, HIGHWAY RESTORATION 2,270,000 2 (BASE PROJECT ALLOCATION - $2,000,000) 3 (LAND ALLOCATION - $270,000) 4 (11) SR 15, HIGHWAY RESTORATION 3,670,000 5 (BASE PROJECT ALLOCATION - $3,400,000) 6 (LAND ALLOCATION - $270,000) 7 (12) SR 15, HIGHWAY RESTORATION 5,835,000 8 (BASE PROJECT ALLOCATION - $5,400,000) 9 (LAND ALLOCATION - $435,000) 10 (13) SR 2014, RESURFACING AND RESTORATION 660,000 11 (BASE PROJECT ALLOCATION - $650,000) 12 (LAND ALLOCATION - $10,000) 13 (14) SR 2039, RETAINING WALL AND 14 RESTORATION 640,000 15 (BASE PROJECT ALLOCATION - $550,000) 16 (LAND ALLOCATION - $50,000) 17 (DESIGN AND CONTINGENCIES - $40,000) 18 (15) SR 2060, RESURFACING AND RESTORATION 63,000 19 (BASE PROJECT ALLOCATION - $53,000) 20 (LAND ALLOCATION - $10,000) 21 (16) SR 220, RESURFACING AND RESTORATION 535,000 22 (BASE PROJECT ALLOCATION - $525,000) 23 (LAND ALLOCATION - $10,000) 24 (17) SR 220, SAFETY IMPROVEMENT, WIDENING 25 AND CONSTRUCT LOON 119,000 26 (BASE PROJECT ALLOCATION - $50,000) 27 (LAND ALLOCATION - $54,000) 28 (DESIGN AND CONTINGENCIES - $15,000) 29 (18) SR 3027, RESURFACING AND RESTORATION 70,000 30 (BASE PROJECT ALLOCATION - $60,000) 20080S1504B2377 - 91 -
1 (LAND ALLOCATION - $10,000) 2 (19) SR 3028, RESURFACING AND RESTORATION 367,000 3 (BASE PROJECT ALLOCATION - $357,000) 4 (LAND ALLOCATION - $10,000) 5 (20) SR 54, RESURFACING AND RESTORATION 100,000 6 (BASE PROJECT ALLOCATION - $90,000) 7 (LAND ALLOCATION - $10,000) 8 (21) SR 654, RESURFACING AND RESTORATION 980,000 9 (BASE PROJECT ALLOCATION - $970,000) 10 (LAND ALLOCATION - $10,000) 11 SECTION 342. MCKEAN COUNTY. 12 PROJECTS ARE AS FOLLOWS: 13 (1) SR 446, HIGHWAY LIGHTING FOR SAFETY 14 IMPROVEMENTS, SR 446 LIGHTING BETWEEN 15 SR 155 AND SR 1002, ELDRED TOWNSHIP 35,000 16 (BASE PROJECT ALLOCATION - $3,000) 17 (LAND ALLOCATION - $17,000) 18 (DESIGN AND CONTINGENCIES - $15,000) 19 (2) SR 770, SIGHT DISTANCE INTERSECTION 20 IMPROVEMENTS, SAFETY IMPROVEMENTS, SR 21 770 AND SR 4005 INTERSECTION, BRADFORD 22 TOWNSHIP 145,000 23 (BASE PROJECT ALLOCATION - $100,000) 24 (LAND ALLOCATION - $20,000) 25 (DESIGN AND CONTINGENCIES - $25,000) 26 SECTION 343. MERCER COUNTY. 27 PROJECTS ARE AS FOLLOWS: 28 (1) SR 208, TURN LANES, INTERCHANGE 29 IMPROVEMENTS, SR 208 AT BLACKTOWN ROAD, 30 SR 2006 AND AT GEORGE JUNIOR ROAD, SR 20080S1504B2377 - 92 -
1 63, PINE TOWNSHIP 245,000 2 (BASE PROJECT ALLOCATION - $200,000) 3 (LAND ALLOCATION - $15,000) 4 (DESIGN AND CONTINGENCIES - $30,000) 5 (2) SR 18, RELOCATION OF EAST LAKE ROAD 6 FROM INTERSECTION WITH SR 18, 7 PYMATUNING TOWNSHIP 3,450,000 8 (BASE PROJECT ALLOCATION - $2,500,000) 9 (LAND ALLOCATION - $150,000) 10 (DESIGN AND CONTINGENCIES - $800,000) 11 (3) RECONSTRUCTION AND SUBSIDENCE 12 PREVENTION CONSTRUCTION, EAST LAKE 13 ROAD, FROM PA 18 FOR 0.2 MILES, 14 PYMATUNING TOWNSHIP 3,550,000 15 (BASE PROJECT ALLOCATION - $2,500,000) 16 (LAND ALLOCATION - $250,000) 17 (DESIGN AND CONTINGENCIES - $800,000) 18 (4) I-80, INTERSTATE RESTORATION AND 19 RECONSTRUCTION 27,000,000 20 (BASE PROJECT ALLOCATION - $27,000,000) 21 (5) I-79, INTERSTATE RESTORATION AND 22 RECONSTRUCTION 25,500,000 23 (BASE PROJECT ALLOCATION - $25,500,000) 24 (6) SR 60, PHASE 2, RESTORATION, 25 REHABILITATION AND UPGRADING EXISTING 26 SIGNALS 2,476,000 27 (BASE PROJECT ALLOCATION - $1,200,000) 28 (DESIGN AND CONTINGENCIES - $1,276,000) 29 (7) SR 60, SAFETY IMPROVEMENT, 30 RECONSTRUCTION FOR TURNING LANE, 20080S1504B2377 - 93 -
1 INTERSECTION IMPROVEMENTS, ROADWAY 2 RESURFACING, UPDATE OF TRAFFIC SIGNALS 2,819,000 3 (BASE PROJECT ALLOCATION - $1,839,000) 4 (LAND ALLOCATION - $260,000) 5 (DESIGN AND CONTINGENCIES - $720,000) 6 SECTION 344. MIFFLIN COUNTY (RESERVED). 7 SECTION 345. MONROE COUNTY. 8 PROJECTS ARE AS FOLLOWS: 9 (1) SR 33, INSTALLATION OF MEDIAN BARRIER, 10 SR 33 MEDIAN BARRIER SOUTH SECTION, 11 SEGMENT 0130 TO SEGMENT 0181, HAMILTON 12 TOWNSHIP 870,000 13 (BASE PROJECT ALLOCATION - $60,000) 14 (LAND ALLOCATION - $10,000) 15 (DESIGN AND CONTINGENCIES - $800,000) 16 (2) SR 33, INSTALLATION OF MEDIAN BARRIER, 17 SAFETY IMPROVEMENT, SR 33 MEDIAN 18 BARRIER, SOUTH SECTION, SEGMENT 0010 TO 19 SEGMENT 0100, HAMILTON AND ROSS 20 TOWNSHIPS 550,000 21 (BASE PROJECT ALLOCATION - $40,000) 22 (LAND ALLOCATION - $10,000) 23 (DESIGN AND CONTINGENCIES - $500,000) 24 (3) SR 80, REPLACEMENT OF PRECAST 25 PARAPETS, BRIDGES WITH HOAN-LIKE 26 DETAILS, GROUP A, I-80, SEGMENT 2931 27 AND SEGMENT 2935, VARIOUS 28 MUNICIPALITIES 1,120,000 29 (BASE PROJECT ALLOCATION - $100,000) 30 (DESIGN AND CONTINGENCIES - $1,020,000) 20080S1504B2377 - 94 -
1 (4) SR 80, REPLACEMENT OF PRECAST 2 PARAPETS, BRIDGES WITH HOAN-LIKE 3 DETAILS, GROUP B, I-80, SEGMENT 2974, 4 VARIOUS MUNICIPALITIES 2,543,000 5 (BASE PROJECT ALLOCATION - $200,000) 6 (DESIGN AND CONTINGENCIES - $2,343,000) 7 (5) SR 80, REPLACEMENT OF PRECAST 8 PARAPETS, BRIDGES WITH HOAN-LIKE 9 DETAILS, GROUP C, I-80, SEGMENT 3044 10 AND SEGMENT 3050, VARIOUS 11 MUNICIPALITIES 2,134,000 12 (BASE PROJECT ALLOCATION - $80,000) 13 (DESIGN AND CONTINGENCIES - $2,054,000) 14 (6) SR 80, INSTALL DYNAMIC MESSAGE SIGNS 15 AND CLOSED CIRCUIT TELEVISION CAMERAS, 16 I-80 CORRIDOR, ROUND 1, VARIOUS 17 MUNICIPALITIES 300,000 18 (BASE PROJECT ALLOCATION - $150,000) 19 (DESIGN AND CONTINGENCIES - $150,000) 20 (7) SR 80, INSTALL DYNAMIC MESSAGE SIGNS 21 AND CLOSED CIRCUIT TELEVISION CAMERAS, 22 I-80 CORRIDOR, ROUND 2, VARIOUS 23 MUNICIPALITIES 330,000 24 (BASE PROJECT ALLOCATION - $150,000) 25 (DESIGN AND CONTINGENCIES - $180,000) 26 (8) SR 80, INSTALL DYNAMIC MESSAGE SIGNS, 27 CLOSED CIRCUIT TELEVISION CAMERAS, 28 HIGHWAY ADVISORY RADIO AND HIGHWAY 29 ADVISORY RADIO BEACONS, I-80 AND I-380 30 CORRIDORS, VARIOUS MUNICIPALITIES 345,000 20080S1504B2377 - 95 -
1 (BASE PROJECT ALLOCATION - $65,000) 2 (LAND ALLOCATION - $10,000) 3 (DESIGN AND CONTINGENCIES - $270,000) 4 (9) SR 80, INSTALL DYNAMIC MESSAGE SIGNS 5 AND CLOSED CIRCUIT TELEVISION CAMERAS, 6 I-80 AND I-380 CORRIDORS, ROUND 4, 7 VARIOUS MUNICIPALITIES 320,000 8 (BASE PROJECT ALLOCATION - $175,000) 9 (DESIGN AND CONTINGENCIES - $145,000) 10 (10) SR 80, INSTALL DYNAMIC MESSAGE SIGNS, 11 I-80 AND I-380 CORRIDORS, ROUND 5, 12 VARIOUS MUNICIPALITIES 300,000 13 (BASE PROJECT ALLOCATION - $150,000) 14 (LAND ALLOCATION - $45,000) 15 (DESIGN AND CONTINGENCIES - $105,000) 16 (11) SR 447, SIGNALIZATION AND 17 CONSTRUCTION OF DEDICATED TURNING 18 LANES, SR 447 AND BRUSHY MOUNTAIN ROAD, 19 STROUD TOWNSHIP 1,500,000 20 (BASE PROJECT ALLOCATION - $1,500,000) 21 (12) I-380, INSTERSTATE RESTORATION AND 22 RECONSTRUCTION 13,100,000 23 (BASE PROJECT ALLOCATION - $13,100,000) 24 (13) I-80, INTERSTATE RESTORATION AND 25 RECONSTRUCTION 27,300,000 26 (BASE PROJECT ALLOCATION - $27,300,000) 27 (14) SR 611, INTERSECTION IMPROVEMENT, 28 REALIGNMENT, CONSTRUCT A CONNECTOR ROAD 29 TO CONNECT SR 196 TO SR 611 476,000 30 (BASE PROJECT ALLOCATION - $361,000) 20080S1504B2377 - 96 -
1 (DESIGN AND CONTINGENCIES - $115,000) 2 (15) SR 33, MEDIAN BARRIER INSTALLATION 763,000 3 (BASE PROJECT ALLOCATION - $500,000) 4 (LAND ALLOCATION - $243,000) 5 (DESIGN AND CONTINGENCIES - $20,000) 6 SECTION 346. MONTGOMERY COUNTY. 7 PROJECTS ARE AS FOLLOWS: 8 (1) SR 1012, WIDENING OF APPROACHES TO 9 PROVIDE LEFT AND RIGHT TURN LANES AND 10 INTERSECTION IMPROVEMENTS, LOWER ROAD 11 FROM ALLENTOWN ROAD TO INTERSECTIONS AT 12 COWPATH ROAD AND INTERSECTIONS AT SR 13 1012, GODSHALL ROAD, FRANCONIA 14 TOWNSHIP 400,000 15 (BASE PROJECT ALLOCATION - $400,000) 16 (2) SR 202, RECONSTRUCTION AND WIDENING, 17 US 202, HANCOCK ROAD TO PA 309, NO.1, 18 LOWER GWYNEDD, MONTGOMERY AND UPPER 19 GWYNEDD TOWNSHIPS 6,702,000 20 (BASE PROJECT ALLOCATION - $5,900,000) 21 (LAND ALLOCATION - $802,000) 22 (3) SR 23, CONSTRUCT FOUR-LANE CONTROLLED 23 ACCESS HIGHWAY, APPROXIMATELY 3.5 MILES 24 IN LENGTH, SR 23 BETWEEN US 422 AND 25 DEKALB PIKE, US 202, UPPER MERION 26 TOWNSHIP 11,100,000 27 (BASE PROJECT ALLOCATION - $10,000,000) 28 (LAND ALLOCATION - $500,000) 29 (DESIGN AND CONTINGENCIES - $600,000) 30 (4) SR 3001, RELOCATION, REALIGNMENT, 20080S1504B2377 - 97 -
1 NORRISTOWN ROAD AT STENTON AVENUE AND 2 NARCISSA ROAD, WHITPAIN TOWNSHIP 200,000 3 (BASE PROJECT ALLOCATION - $200,000) 4 (5) SR 3029, ROAD WIDENING, I-76 5 INTERSECTION AND HENDERSON ROAD, UPPER 6 MERION TOWNSHIP 2,920,000 7 (BASE PROJECT ALLOCATION - $2,000,000) 8 (LAND ALLOCATION - $400,000) 9 (DESIGN AND CONTINGENCIES - $520,000) 10 (6) SR 4028, REALIGNMENT AND WIDENING TO 11 SOFTEN CURVE, SR 4028, PLEASANT VIEW 12 ROAD, LOWER POTTSGROVE TOWNSHIP 120,000 13 (BASE PROJECT ALLOCATION - $120,000) 14 (7) SR 422, CORRIDOR SAFETY IMPROVEMENT, 15 US 422 INTERIM IMPROVEMENTS, LOWER 16 PROVIDENCE, MONTGOMERY, UPPER MERION 17 AND WEST NORRITON TOWNSHIPS 1,025,000 18 (BASE PROJECT ALLOCATION - $1,000,000) 19 (LAND ALLOCATION - $25,000) 20 (8) SR 476, ITS RECONSTRUCTION AND 21 PURCHASES, I-476 SCHUYLKILL RIVER 22 BRIDGE REDECKING, COMPANION PROJECT, 23 CONSHOHOCKEN BOROUGH AND PLYMOUTH 24 TOWNSHIP 1,230,000 25 (BASE PROJECT ALLOCATION - $1,230,000) 26 (9) SR 476, HIGHWAY RECONSTRUCTION, I-476 27 FROM SCHUYLKILL EXPRESSWAY, I-76, TO 28 PENNSYLVANIA TURNPIKE, I-276, 29 CONSHOHOCKEN AND WEST CONSHOHOCKEN 30 BOROUGHS, LOWER MERION AND PLYMOUTH 20080S1504B2377 - 98 -
1 TOWNSHIPS 101,500,000 2 (BASE PROJECT ALLOCATION - 3 $100,000,000) 4 (LAND ALLOCATION - $1,500,000) 5 (10) SR 73, CORRIDOR SAFETY IMPROVEMENT, 6 INTERSECTION IMPROVEMENT, PA 73 FROM US 7 202 TO BUTLER PIKE, SKIPPACK AND UPPER 8 MERION TOWNSHIPS 560,000 9 (BASE PROJECT ALLOCATION - $560,000) 10 (11) SR 9102, EXTENSION, ADD LANE, 11 LAFAYETTE STREET CORRIDOR, NORRISTOWN 12 BOROUGH AND UPPER MERION TOWNSHIP 9,000,000 13 (BASE PROJECT ALLOCATION - $9,000,000) 14 (12) US 202, ADD LANE, WIDEN, RESTORATION, 15 REHABILITATION, SAFETY IMPROVEMENTS, US 16 202, MARKLEY STREET IMPROVEMENT, 17 NORRISTOWN BOROUGH 3,680,000 18 (BASE PROJECT ALLOCATION - $3,400,000) 19 (LAND ALLOCATION - $280,000) 20 (13) EXISTING SIGNAL IMPROVEMENT, WIDEN, 21 MARKLEY STREET IMPROVEMENT, HARDING 22 BOULEVARD TO JOHNSON STREET, NORRISTOWN 23 BOROUGH 3,000,000 24 (BASE PROJECT ALLOCATION - $2,800,000) 25 (LAND ALLOCATION - $200,000) 26 (14) I-476, INTERSTATE RESTORATION AND 27 RECONSTRUCTION 5,300,000 28 (BASE PROJECT ALLOCATION - $5,300,000) 29 (15) I-76, INTERSTATE RESTORATION AND 30 RECONSTRUCTION 11,900,000 20080S1504B2377 - 99 -
1 (BASE PROJECT ALLOCATION - $11,900,000) 2 (16) PA 463, WIDEN TO FOUR LANES 995,000 3 (BASE PROJECT ALLOCATION - $995,000) 4 (17) SR 2001, INTERSECTION IMPROVEMENT, 5 TURN LANES AND SIGNALS 400,000 6 (BASE PROJECT ALLOCATION - $360,000) 7 (DESIGN AND CONTINGENCIES - $40,000) 8 (18) SR 2027, INTERSECTION IMPROVEMENT, 9 TRAFFIC SIGNAL, ALIGN CAMP HILL ROAD 10 WITH PA AVENUE, LEFT TURN LANES 1,065,000 11 (BASE PROJECT ALLOCATION - $784,000) 12 (LAND ALLOCATION - $187,000) 13 (DESIGN AND CONTINGENCIES - $94,000) 14 (19) SR 2038, INTERSECTION IMPROVEMENT, 15 WIDEN FOR SOUTH BOUND RIGHT TURN LANE 234,000 16 (BASE PROJECT ALLOCATION - $200,000) 17 (LAND ALLOCATION - $20,000) 18 (DESIGN AND CONTINGENCIES - $14,000) 19 (20) US 202, WIDEN, INTERSECTION UPGRADES 20 AND STRUCTURE REHABILITATION 400,000 21 (LAND ALLOCATION - $400,000) 22 SECTION 347. MONTOUR COUNTY. 23 PROJECTS ARE AS FOLLOWS: 24 (1) I-80, INTERSTATE RESTORATION AND 25 RECONSTRUCTION 10,900,000 26 (BASE PROJECT ALLOCATION - $10,900,000) 27 (2) SR 11, RESURFACING AND RESTORATION 1,290,000 28 (BASE PROJECT ALLOCATION - $1,280,000) 29 (LAND ALLOCATION - $10,000) 30 (3) SR 11, RESURFACING AND RESTORATION 1,290,000 20080S1504B2377 - 100 -
1 (BASE PROJECT ALLOCATION - $1,280,000) 2 (LAND ALLOCATION - $10,000) 3 (4) SR 44, RESURFACING AND RESTORATION 10,000 4 (LAND ALLOCATION - $10,000) 5 (5) SR 54, RESURFACING AND RESTORATION 10,000 6 (LAND ALLOCATION - $10,000) 7 (6) SR 54, RESURFACING AND RESTORATION 10,000 8 (LAND ALLOCATION - $10,000) 9 (7) SR 642, RESURFACING AND RESTORATION 1,510,000 10 (BASE PROJECT ALLOCATION - $1,500,000) 11 (LAND ALLOCATION - $10,000) 12 SECTION 348. NORTHAMPTON COUNTY. 13 PROJECTS ARE AS FOLLOWS: 14 (1) SR 191 AND SR 248, INSTALLATION OF A 15 CLOSED LOOP SYSTEM, SR 191 AND SR 248 16 INTERSECTION, NAZARETH BOROUGH 400,000 17 (BASE PROJECT ALLOCATION - $55,000) 18 (LAND ALLOCATION - $5,000) 19 (DESIGN AND CONTINGENCIES - $340,000) 20 (2) SR 33, EXPANSION OF EXISTING PARK AND 21 RIDE FACILITY, SR 33, PARK AND RIDE 22 LOT, BETHLEHEM TOWNSHIP 5,000,000 23 (BASE PROJECT ALLOCATION - $100,000) 24 (LAND ALLOCATION - $200,000) 25 (DESIGN AND CONTINGENCIES - $4,700,000) 26 (3) SR 378, RAMP RECONFIGURATION, 412 27 SECOND STREET RAMP, CITY OF BETHLEHEM 1,740,000 28 (BASE PROJECT ALLOCATION - $1,620,000) 29 (LAND ALLOCATION - $120,000) 30 (4) SR 611, CORRIDOR MANAGEMENT PLAN TO 20080S1504B2377 - 101 -
1 PRESERVE SCENIC, HISTORIC AND CULTURAL 2 QUALITIES, DELAWARE RIVER VALLEY SCENIC 3 BYWAY, LOWER MT. BETHEL AND WILLIAMS 4 TOWNSHIPS 700,000 5 (BASE PROJECT ALLOCATION - $115,000) 6 (LAND ALLOCATION - $85,000) 7 (DESIGN AND CONTINGENCIES - $500,000) 8 (5) SR 611, FLASHING WARNING DEVICES, ROCK 9 EXCAVATION, MEDIAN BARRIER, RETAINING 10 WALL, SHOULDERS, SR 611, CANAL LOCK 11 CURVES, WILLIAMS TOWNSHIP 700,000 12 (BASE PROJECT ALLOCATION - $150,000) 13 (LAND ALLOCATION - $50,000) 14 (DESIGN AND CONTINGENCIES - $500,000) 15 (6) SR 611, DRAINAGE, REMOVE CURBS, 16 SHOULDERS, GUIDE RAIL AND UTILITY POLE, 17 SR 611 SAFETY IMPROVEMENT, WILLIAMS 18 TOWNSHIP, CITY OF EASTON 600,000 19 (BASE PROJECT ALLOCATION - $150,000) 20 (LAND ALLOCATION - $50,000) 21 (DESIGN AND CONTINGENCIES - $400,000) 22 (7) SR 33 AND SR 1002, PALMER TOWNSHIP 23 INTERCHANGE, PALMER TOWNSHIP 23,000,000 24 (BASE PROJECT ALLOCATION - $23,000,000) 25 (8) I-78, INTERSTATE RESTORATION AND 26 RECONSTRUCTION 11,900,000 27 (BASE PROJECT ALLOCATION - $11,900,000) 28 (9) SR 378, CONVERT TRAFFIC FLOW ONE WAY 29 AND TWO WAY 500,000 30 (BASE PROJECT ALLOCATION - $500,000) 20080S1504B2377 - 102 -
1 (10) SR 412, PARK AND RIDE LOT, INTERMODAL 2 SERVICES 167,000 3 (BASE PROJECT ALLOCATION - $167,000) 4 (11) SR 378, RELOCATE AND WIDEN THE RAMP 1,740,000 5 (BASE PROJECT ALLOCATION - $1,620,000) 6 (DESIGN AND CONTINGENCIES - $120,000) 7 SECTION 349. NORTHUMBERLAND COUNTY. 8 PROJECTS ARE AS FOLLOWS: 9 (1) SR 4012, RESURFACE, REHABILITATION, SR 10 4012 FROM ZIMMERMAN'S HOLLOW ROAD TO SR 11 487, SNYDERTOWN BOROUGH, RALPHO, 12 SHAMOKIN AND UPPER AUGUSTA TOWNSHIPS 2,500,000 13 (BASE PROJECT ALLOCATION - $2,500,000) 14 (2) SR 61, CONGESTED CORRIDOR IMPROVEMENT 15 PROGRAM, CORRIDOR SAFETY IMPROVEMENT, 16 SR 61 FROM SR 890 TO SR 147, UPPER 17 AUGUSTA TOWNSHIP, CITY OF SUNBURY 50,000 18 (DESIGN AND CONTINGENCIES - $50,000) 19 (3) I-180, INTERSTATE RESTORATION AND 20 RECONSTRUCTION 8,900,000 21 (BASE PROJECT ALLOCATION - $8,900,000) 22 (4) I-80, INTERSTATE RESTORATION AND 23 RECONSTRUCTION 5,000,000 24 (BASE PROJECT ALLOCATION - $5,000,000) 25 (5) SR 147, RESURFACING AND RESTORATION 710,000 26 (BASE PROJECT ALLOCATION - $700,000) 27 (LAND ALLOCATION - $10,000) 28 (6) SR 225, RESURFACING AND RESTORATION 437,000 29 (BASE PROJECT ALLOCATION - $432,000) 30 (LAND ALLOCATION - $5,000) 20080S1504B2377 - 103 -
1 (7) SR 225, RESURFACING AND RESTORATION 970,000 2 (BASE PROJECT ALLOCATION - $960,000) 3 (LAND ALLOCATION - $10,000) 4 (8) SR 225, RESURFACING AND RESTORATION 1,110,000 5 (BASE PROJECT ALLOCATION - $1,100,000) 6 (LAND ALLOCATION - $10,000) 7 (9) SR 4006, RESURFACING AND RESTORATION 1,107,000 8 (BASE PROJECT ALLOCATION - $1,097,000) 9 (LAND ALLOCATION - $10,000) 10 (10) SR 54, RESURFACING AND RESTORATION 320,000 11 (BASE PROJECT ALLOCATION - $310,000) 12 (LAND ALLOCATION - $10,000) 13 (11) SR 54, RESURFACING AND RESTORATION 970,000 14 (BASE PROJECT ALLOCATION - $960,000) 15 (LAND ALLOCATION - $10,000) 16 (12) SR 61, RESURFACING AND RESTORATION 785,000 17 (BASE PROJECT ALLOCATION - $775,000) 18 (LAND ALLOCATION - $10,000) 19 SECTION 350. PERRY COUNTY. 20 PROJECTS ARE AS FOLLOWS: 21 (1) SR 274, INTERSECTION IMPROVEMENT, ADD 22 TURNING LANES 475,000 23 (BASE PROJECT ALLOCATION - $475,000) 24 (2) SR 34, INTERSECTION IMPROVEMENT 2,420,000 25 (LAND ALLOCATION - $920,000) 26 (DESIGN AND CONTINGENCIES - $1,500,000) 27 SECTION 351. PHILADELPHIA COUNTY. 28 PROJECTS ARE AS FOLLOWS: 29 (1) SIGNAL IMPROVEMENTS, CONGESTION 30 REDUCTION, 34TH STREET, MANTUA AVENUE 20080S1504B2377 - 104 -
1 TO SPRUCE STREET, CITY OF PHILADELPHIA 220,000 2 (BASE PROJECT ALLOCATION - $220,000) 3 (2) SR 676, HIGHWAY AND STRUCTURE 4 REPLACEMENT, RECONSTRUCTION, VINE 5 STREET EXPRESSWAY, 7 BRIDGE PROJECT, 6 CITY OF PHILADELPHIA 4,373,000 7 (BASE PROJECT ALLOCATION - $460,000) 8 (LAND ALLOCATION - $143,000) 9 (DESIGN AND CONTINGENCIES - $3,770,000) 10 (3) SR 76, TRAFFIC SYSTEM MANAGEMENT, I-76 11 REGIONAL TRAVEL INFORMATION, 12 CONSHOHOCKEN AND WEST CONSHOHOCKEN 13 BOROUGHS, LOWER MERION AND UPPER MERION 14 TOWNSHIPS AND CITY OF PHILADELPHIA 667,000 15 (BASE PROJECT ALLOCATION - $417,000) 16 (DESIGN AND CONTINGENCIES - $250,000) 17 (4) SR 95, SURFACE STREET RECONSTRUCTION 18 ALONG WITH SEVERAL RAMPS, INTERCHANGE 19 IMPROVEMENT AND WIDENING, COTTMAN- 20 PRINCETON LOCAL STREET RAMP, CITY OF 21 PHILADELPHIA 3,400,000 22 (BASE PROJECT ALLOCATION - $2,500,000) 23 (LAND ALLOCATION - $900,000) 24 (5) SR 95, UTILITY RELOCATION, WATER AND 25 SEWER, RETAINING WALLS, SIGNAL 26 IMPROVEMENTS AND SURFACE STREETS 27 RECONSTRUCTION, I-95 CORRIDOR, 28 WISSINOMING AVENUE, BLEIGH AVENUE, 29 MILNOR STREET, CITY OF PHILADELPHIA 2,000,000 30 (BASE PROJECT ALLOCATION - $1,500,000) 20080S1504B2377 - 105 -
1 (LAND ALLOCATION - $500,000) 2 (6) I-76, INTERSTATE RESTORATION AND 3 RECONSTRUCTION 7,500,000 4 (BASE PROJECT ALLOCATION - $7,500,000) 5 (7) I-676, INTERSTATE RESTORATION AND 6 RECONSTRUCTION 1,500,000 7 (BASE PROJECT ALLOCATION - $1,500,000) 8 (8) I-95, INTERSTATE RESTORATION AND 9 RECONSTRUCTION 21,000,000 10 (BASE PROJECT ALLOCATION - $21,000,000) 11 SECTION 352. PIKE COUNTY. 12 PROJECTS ARE AS FOLLOWS: 13 (1) SR 2001, RESTORATION AND 14 RECONSTRUCTION, MILFORD TO BUSHKILL 15 NO.5, ROCKLEDGE ROAD TO SR 739 AND 16 INCLUDING SR 739, DELAWARE TOWNSHIP 3,400,000 17 (BASE PROJECT ALLOCATION - $2,400,000) 18 (LAND ALLOCATION - $1,000,000) 19 (2) SR 84, RECONSTRUCTION, I-84, PIKE 20 COUNTY, BLOOMING GROVE AND DINGMAN 21 TOWNSHIPS 4,140,000 22 (BASE PROJECT ALLOCATION - $3,600,000) 23 (DESIGN AND CONTINGENCIES - $540,000) 24 (3) SR 84, ITS IMPROVEMENTS AND PURCHASES, 25 I-84 CORRIDOR, VARIOUS MUNICIPALITIES 480,000 26 (BASE PROJECT ALLOCATION - $400,000) 27 (DESIGN AND CONTINGENCIES - $80,000) 28 (4) I-84, INTERSTATE RESTORATION AND 29 RECONSTRUCTION 35,100,000 30 (BASE PROJECT ALLOCATION - $35,100,000) 20080S1504B2377 - 106 -
1 (5) SR 739, SAFETY IMPROVEMENT, STRAIGHTEN 2 CURVE AND RESTORATION 109,000 3 (DESIGN AND CONTINGENCIES - $109,000) 4 SECTION 353. POTTER COUNTY. 5 PROJECTS ARE AS FOLLOWS: 6 (1) SR 6, TURN LANES, SAFETY IMPROVEMENT, 7 SR 6 AND SR 872, COUDERSPORT BOROUGH 8 AND EULALIA TOWNSHIP 300,000 9 (BASE PROJECT ALLOCATION - $200,000) 10 (LAND ALLOCATION - $25,000) 11 (DESIGN AND CONTINGENCIES - $75,000) 12 SECTION 354. SCHUYLKILL COUNTY. 13 PROJECTS ARE AS FOLLOWS: 14 (1) SR 2002, REPLACEMENT OF PRECAST 15 PARAPETS, GROUP D, SR 2002 CORRIDOR, 16 PORT CARBON BOROUGH 320,000 17 (BASE PROJECT ALLOCATION - $100,000) 18 (DESIGN AND CONTINGENCIES - $220,000) 19 (2) SR 61, INTERIM TRAFFIC SIGNAL, SR 61 20 AND SR 895 INTERSECTION, DEER LAKE 21 BOROUGH 300,000 22 (BASE PROJECT ALLOCATION - $50,000) 23 (LAND ALLOCATION - $50,000) 24 (DESIGN AND CONTINGENCIES - $200,000) 25 (3) SR 61, UPGRADE SIGNALIZATION, SR 61, 26 TUNNEL ROAD, EAST NORWEGIAN TOWNSHIP 325,000 27 (BASE PROJECT ALLOCATION - $50,000) 28 (LAND ALLOCATION - $50,000) 29 (DESIGN AND CONTINGENCIES - $225,000) 30 (4) SR 61, MEDIAN BARRIER INSTALLATION, SR 20080S1504B2377 - 107 -
1 61, MEDIAN BARRIER, ORWIGSBURG BOROUGH, 2 NORTH MANHEIM AND WEST BRUNSWICK 3 TOWNSHIPS 300,000 4 (BASE PROJECT ALLOCATION - $50,000) 5 (LAND ALLOCATION - $10,000) 6 (DESIGN AND CONTINGENCIES - $240,000) 7 (5) SR 61, INTERIM TRAFFIC SIGNAL, SR 61, 8 BRICK HILL ROAD, WEST BRUNSWICK 9 TOWNSHIP 300,000 10 (BASE PROJECT ALLOCATION - $50,000) 11 (LAND ALLOCATION - $50,000) 12 (DESIGN AND CONTINGENCIES - $200,000) 13 (6) SR 61, PAVEMENT RESTORATION, 14 REHABILITATION, INTERSTATE IMPROVEMENT, 15 I-81 LEBANON COUNTY LINE TO PINE GROVE, 16 PINE GROVE TOWNSHIP 1,074,000 17 (BASE PROJECT ALLOCATION - $840,000) 18 (LAND ALLOCATION - $80,000) 19 (DESIGN AND CONTINGENCIES - $154,000) 20 (7) SR 81, INSTALL DYNAMIC MESSAGE SIGNS 21 AND CLOSED CIRCUIT TELEVISION CAMERAS, 22 I-81 CORRIDOR, ROUND 1, VARIOUS 23 MUNICIPALITIES 415,000 24 (BASE PROJECT ALLOCATION - $200,000) 25 (DESIGN AND CONTINGENCIES - $215,000) 26 (8) SR 81, INSTALL DYNAMIC MESSAGE SIGNS, 27 CLOSED CIRCUIT TELEVISION CAMERAS, 28 HIGHWAY ADVISORY RADIO AND HIGHWAY 29 ADVISORY RADIO BEACONS, I-81 CORRIDOR, 30 ROUND 2, VARIOUS MUNICIPALITIES 315,000 20080S1504B2377 - 108 -
1 (BASE PROJECT ALLOCATION - $65,000) 2 (LAND ALLOCATION - $10,000) 3 (DESIGN AND CONTINGENCIES - $240,000) 4 (9) SR 1006, WADE ROAD, RECONSTRUCTION 5 FROM SR 1028 TO ROUTE 61, ST. CLAIR 6 BOROUGH 3,000,000 7 (BASE PROJECT ALLOCATION - $3,000,000) 8 (10) I-81, INTERSTATE RESTORATION AND 9 RECONSTRUCTION 42,300,000 10 (BASE PROJECT ALLOCATION - $42,300,000) 11 SECTION 355. SNYDER COUNTY. 12 PROJECTS ARE AS FOLLOWS: 13 (1) SR 1017, RESURFACING AND RESTORATION 1,210,000 14 (BASE PROJECT ALLOCATION - $1,200,000) 15 (LAND ALLOCATION - $10,000) 16 (2) SR 1023, RESURFACING AND RESTORATION 320,000 17 (BASE PROJECT ALLOCATION - $310,000) 18 (LAND ALLOCATION - $10,000) 19 (3) SR 104, RESURFACING AND RESTORATION 205,000 20 (BASE PROJECT ALLOCATION - $200,000) 21 (LAND ALLOCATION - $5,000) 22 (4) SR 2017, RESURFACING AND RESTORATION 635,000 23 (BASE PROJECT ALLOCATION - $625,000) 24 (LAND ALLOCATION - $10,000) 25 (5) SR 235, RESURFACING AND RESTORATION 1,010,000 26 (BASE PROJECT ALLOCATION - $1,000,000) 27 (LAND ALLOCATION - $10,000) 28 (6) SR 235, RESURFACING AND RESTORATION 1,240,000 29 (BASE PROJECT ALLOCATION - $1,230,000) 30 (LAND ALLOCATION - $10,000) 20080S1504B2377 - 109 -
1 (7) SR 35, RESURFACING AND RESTORATION 1,510,000 2 (BASE PROJECT ALLOCATION - $1,500,000) 3 (LAND ALLOCATION - $10,000) 4 (8) SR 522, RESURFACING AND RESTORATION 1,175,000 5 (BASE PROJECT ALLOCATION - $1,165,000) 6 (LAND ALLOCATION - $10,000) 7 (9) SR 522, RESURFACING AND RESTORATION 10,000 8 (LAND ALLOCATION - $10,000) 9 (10) SR 522, RESURFACING AND RESTORATION 305,000 10 (BASE PROJECT ALLOCATION - $300,000) 11 (LAND ALLOCATION - $5,000) 12 SECTION 356. SOMERSET COUNTY. 13 PROJECTS ARE AS FOLLOWS: 14 (1) SR 219, NEW FOUR-LANE ROADWAY 15 ALIGNMENT, US 219, GARRETT, END OF 16 EXISTING FOUR-LANE IN SOMERSET TOWNSHIP 17 TO MEYERSDALE BYPASS IN SUMMIT 18 TOWNSHIP, BROTHERSVALLEY, SOMERSET AND 19 SUMMIT TOWNSHIPS 36,000,000 20 (BASE PROJECT ALLOCATION - $27,000,000) 21 (LAND ALLOCATION - $7,000,000) 22 (DESIGN AND CONTINGENCIES - $2,000,000) 23 (2) SR 219, PAVING, NEW FOUR-LANE ROADWAY 24 ALIGNMENT, US 219, GARRETT, END OF 25 EXISTING FOUR-LANE IN SOMERSET TOWNSHIP 26 TO MEYERSDALE BYPASS IN SUMMIT 27 TOWNSHIP, BROTHERSVALLEY, SOMERSET AND 28 SUMMIT TOWNSHIPS 14,000,000 29 (BASE PROJECT ALLOCATION - $14,000,000) 30 (3) SR 219, CONSTRUCTION, NEW FOUR-LANE 20080S1504B2377 - 110 -
1 ALIGNMENT, US 219, GARRETT, END OF 2 EXISTING FOUR-LANE IN SOMERSET TOWNSHIP 3 TO MEYERSDALE BYPASS IN SUMMIT 4 TOWNSHIP, BROTHERSVALLEY, SOMERSET AND 5 SUMMIT TOWNSHIPS 20,000,000 6 (BASE PROJECT ALLOCATION - $20,000,000) 7 (4) SR 219, NEW FOUR-LANE ROADWAY 8 ALIGNMENT, US 219, I-68, MARYLAND TO 9 MEYERSDALE BYPASS, SALISBURY BOROUGH, 10 ELK LICK AND SUMMIT TOWNSHIPS 51,000,000 11 (BASE PROJECT ALLOCATION - $40,000,000) 12 (LAND ALLOCATION - $6,000,000) 13 (DESIGN AND CONTINGENCIES - $5,000,000) 14 (5) SR 3029, RECONSTRUCTION, REAM ROAD, T- 15 362, INTERSECTION TO SEVEN SPRINGS 16 BOROUGH LINE, SEVEN SPRINGS BOROUGH, 17 MIDDLECREEK AND MILFORD TOWNSHIPS 7,450,000 18 (BASE PROJECT ALLOCATION - $6,600,000) 19 (LAND ALLOCATION - $550,000) 20 (DESIGN AND CONTINGENCIES - $300,000) 21 (6) PA 160, SAFETY IMPROVEMENT, 22 CONSTRUCTION OF A RUNAWAY TRUCK RAMP 772,000 23 (BASE PROJECT ALLOCATION - $270,000) 24 (LAND ALLOCATION - $387,000) 25 (DESIGN AND CONTINGENCIES - $115,000) 26 (7) PA 281, INTERSECTION IMPROVEMENT 755,000 27 (BASE PROJECT ALLOCATION - $370,000) 28 (LAND ALLOCATION - $200,000) 29 (DESIGN AND CONTINGENCIES - $185,000) 30 (8) SR 3041, INTERSECTION IMPROVEMENT, 20080S1504B2377 - 111 -
1 CONSTRUCTION OF LEFT TURN LANES AND 2 INCREASING THE ROADWAY CURVE RADIUS 301,000 3 (BASE PROJECT ALLOCATION - $216,000) 4 (LAND ALLOCATION - $85,000) 5 (9) SR 3010, HIGHWAY RESTORATION 574,000 6 (BASE PROJECT ALLOCATION - $574,000) 7 (10) SR 3037, OVERLAY AND INTERSECTION 8 IMPROVEMENT 2,300,000 9 (BASE PROJECT ALLOCATION - $2,300,000) 10 SECTION 357. SULLIVAN COUNTY. 11 PROJECTS ARE AS FOLLOWS: 12 (1) SR 1015, WIDEN AND RESURFACE, SR 1015 13 FROM SR 87 TO BRADFORD COUNTY LINE, 14 CHERRY TOWNSHIP 422,000 15 (BASE PROJECT ALLOCATION - $404,000) 16 (DESIGN AND CONTINGENCIES - $18,000) 17 (2) SR 220, RECONSTRUCT TO 24-FOOT, TWO- 18 LANE HIGHWAY 1,460,000 19 (BASE PROJECT ALLOCATION - $1,456,000) 20 (DESIGN AND CONTINGENCIES - $4,000) 21 (3) SR 220, RESURFACING AND RESTORATION 10,000 22 (LAND ALLOCATION - $10,000) 23 (4) SR 220, RESURFACING AND RESTORATION 25,000 24 (LAND ALLOCATION - $25,000) 25 (5) SR 42, RESURFACING AND RESTORATION 25,000 26 (LAND ALLOCATION - $25,000) 27 (6) SR 87, RESURFACING AND RESTORATION 43,000 28 (BASE PROJECT ALLOCATION - $3,000) 29 (LAND ALLOCATION - $40,000) 30 SECTION 358. SUSQUEHANNA COUNTY. 20080S1504B2377 - 112 -
1 PROJECTS ARE AS FOLLOWS: 2 (1) SR 81, ITS IMPROVEMENTS AND PURCHASES, 3 I-81 CORRIDOR, VARIOUS MUNICIPALITIES 480,000 4 (BASE PROJECT ALLOCATION - $400,000) 5 (DESIGN AND CONTINGENCIES - $80,000) 6 (2) SR 2030, REMOVE EXISTING CONCRETE 7 RAILROAD BRIDGE ABUTMENTS 152,000 8 (BASE PROJECT ALLOCATION - $152,000) 9 (3) I-81, INTERSTATE RESTORATION AND 10 RECONSTRUCTION 26,500,000 11 (BASE PROJECT ALLOCATION - $26,500,000) 12 (4) SR 92, INTERSECTION IMPROVEMENT 380,000 13 (BASE PROJECT ALLOCATION - $380,000) 14 (5) SR 81, INTERCHANGE IMPROVEMENT, RAMP 15 REDESIGN 368,000 16 (BASE PROJECT ALLOCATION - $100,000) 17 (LAND ALLOCATION - $208,000) 18 (DESIGN AND CONTINGENCIES - $60,000) 19 (6) SR 1033, ROADWAY AND SLOPE REPAIR 276,000 20 (BASE PROJECT ALLOCATION - $250,000) 21 (LAND ALLOCATION - $20,000) 22 (DESIGN AND CONTINGENCIES - $6,000) 23 (7) SR 247, HIGHWAY RESTORATION 336,000 24 (BASE PROJECT ALLOCATION - $336,000) 25 (8) SR 267, ROADWAY AND SLOPE REPAIR 829,000 26 (BASE PROJECT ALLOCATION - $805,000) 27 (DESIGN AND CONTINGENCIES - $24,000) 28 (9) SR 29, RESTORATION, ROADWAY AND SLOPE 29 REPAIR 420,000 30 (BASE PROJECT ALLOCATION - $360,000) 20080S1504B2377 - 113 -
1 (LAND ALLOCATION - $50,000) 2 (DESIGN AND CONTINGENCIES - $10,000) 3 (10) SR 3023, ROADWAY AND SLOPE REPAIR 518,000 4 (BASE PROJECT ALLOCATION - $518,000) 5 SECTION 359. TIOGA COUNTY. 6 PROJECTS ARE AS FOLLOWS: 7 (1) SR 2005, SLIDE REPAIR AND SLIDES 8 CORRECTION, SR 2005, SEGMENT 0530, 9 MANSFIELD BOROUGH, RICHMOND TOWNSHIP 980,000 10 (BASE PROJECT ALLOCATION - $840,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $120,000) 13 (2) SR 15, STUDY TO DETERMINE NEEDS OF 14 ROADWAY SIGNING AS I-99 250,000 15 (LAND ALLOCATION - $250,000) 16 (3) SR 15, RESURFACING AND RESTORATION 1,441,000 17 (BASE PROJECT ALLOCATION - $1,375,000) 18 (LAND ALLOCATION - $66,000) 19 (4) SR 15, HIGHWAY RESTORATION 50,000 20 (LAND ALLOCATION - $50,000) 21 (5) SR 2005, RESURFACING AND RESTORATION 2,037,000 22 (BASE PROJECT ALLOCATION - $1,940,000) 23 (LAND ALLOCATION - $97,000) 24 (6) SR 287, RESURFACING AND RESTORATION 480,000 25 (BASE PROJECT ALLOCATION - $470,000) 26 (LAND ALLOCATION - $10,000) 27 (7) SR 287, RESURFACING AND RESTORATION 380,000 28 (BASE PROJECT ALLOCATION - $370,000) 29 (LAND ALLOCATION - $10,000) 30 (8) SR 3019, RESURFACING AND RESTORATION 1,426,000 20080S1504B2377 - 114 -
1 (BASE PROJECT ALLOCATION - $1,360,000) 2 (LAND ALLOCATION - $66,000) 3 (9) SR 4024, RESURFACING AND RESTORATION 2,118,000 4 (BASE PROJECT ALLOCATION - $2,027,000) 5 (LAND ALLOCATION - $91,000) 6 (10) SR 6, RESURFACING AND RESTORATION 735,000 7 (BASE PROJECT ALLOCATION - $701,000) 8 (LAND ALLOCATION - $34,000) 9 (11) SR 6, RESURFACING AND RESTORATION 2,020,000 10 (BASE PROJECT ALLOCATION - $2,000,000) 11 (LAND ALLOCATION - $20,000) 12 SECTION 360. UNION COUNTY. 13 PROJECTS ARE AS FOLLOWS: 14 (1) SR 1004, SAFETY IMPROVEMENT, SR 1004 15 FROM MANNING ROAD TO JPM ROAD, KELLY 16 TOWNSHIP 119,000 17 (BASE PROJECT ALLOCATION - $87,000) 18 (LAND ALLOCATION - $22,000) 19 (DESIGN AND CONTINGENCIES - $10,000) 20 (2) I-80, INTERSTATE RESTORATION AND 21 RECONSTRUCTION 16,000,000 22 (BASE PROJECT ALLOCATION - $16,000,000) 23 (3) SR 192, RESURFACING AND RESTORATION 910,000 24 (BASE PROJECT ALLOCATION - $900,000) 25 (LAND ALLOCATION - $10,000) 26 (4) SR 235, RESURFACING AND RESTORATION 1,610,000 27 (BASE PROJECT ALLOCATION - $1,600,000) 28 (LAND ALLOCATION - $10,000) 29 (5) SR 45, RESURFACING AND RESTORATION 1,310,000 30 (BASE PROJECT ALLOCATION - $1,300,000) 20080S1504B2377 - 115 -
1 (LAND ALLOCATION - $10,000) 2 (6) SR 45, RESURFACING AND RESTORATION 1,760,000 3 (BASE PROJECT ALLOCATION - $1,750,000) 4 (LAND ALLOCATION - $10,000) 5 (7) SR 45, HIGHWAY RECONSTRUCTION 3,150,000 6 (BASE PROJECT ALLOCATION - $3,000,000) 7 (LAND ALLOCATION - $150,000) 8 SECTION 361. VENANGO COUNTY. 9 PROJECTS ARE AS FOLLOWS: 10 (1) WETLAND BANKING, DESIGN, CONSTRUCT AND 11 MONITOR WETLANDS, PHASE II, POLK 12 WETLANDS SITE, SANDYCREEK TOWNSHIP 430,000 13 (BASE PROJECT ALLOCATION - $250,000) 14 (LAND ALLOCATION - $50,000) 15 (DESIGN AND CONTINGENCIES - $130,000) 16 (2) VARIOUS ROUTES, TRAFFIC SIGNAL PROGRAM 17 FOR 2009, SAFETY IMPROVEMENTS, 18 COUNTYWIDE, VARIOUS MUNICIPALITIES 50,000 19 (BASE PROJECT ALLOCATION - $50,000) 20 (3) VARIOUS ROUTES, COUNTYWIDE TRAFFIC 21 SIGNAL PROGRAM FOR 2010, SAFETY 22 IMPROVEMENTS, COUNTYWIDE, VARIOUS 23 MUNICIPALITIES 50,000 24 (BASE PROJECT ALLOCATION - $50,000) 25 (4) I-80, INTERSTATE RESTORATION AND 26 RECONSTRUCTION 14,300,000 27 (BASE PROJECT ALLOCATION - $14,300,000) 28 (5) SR 417, HIGHWAY RESTORATION 1,563,000 29 (BASE PROJECT ALLOCATION - $1,563,000) 30 SECTION 362. WARREN COUNTY. 20080S1504B2377 - 116 -
1 PROJECTS ARE AS FOLLOWS: 2 (1) SR 62, TURNING LANE, EXISTING SIGNAL 3 IMPROVEMENT, SR 62 FROM SR 1008, HATCH 4 RUN ROAD, TO NEW YORK LINE, CONEWANGO 5 AND PINE GROVE TOWNSHIPS 630,000 6 (BASE PROJECT ALLOCATION - $500,000) 7 (LAND ALLOCATION - $30,000) 8 (DESIGN AND CONTINGENCIES - $100,000) 9 SECTION 363. WASHINGTON COUNTY. 10 PROJECTS ARE AS FOLLOWS: 11 (1) SR 1009, INTERSECTION IMPROVEMENT, SR 12 1009, PIKE STREET, AND SR 4049, COUNTRY 13 CLUB ROAD, CHARTIERS TOWNSHIP 1,325,000 14 (BASE PROJECT ALLOCATION - $300,000) 15 (LAND ALLOCATION - $500,000) 16 (DESIGN AND CONTINGENCIES - $525,000) 17 (2) SR 18, HIGHWAY RESTORATION, ATLASBURG 18 TO FOUR LANES, BURGETTSTOWN, 19 BURGETTSTOWN BOROUGH AND SMITH 20 TOWNSHIP 156,000 21 (LAND ALLOCATION - $1,000) 22 (DESIGN AND CONTINGENCIES - $155,000) 23 (3) SR 18, APPROACHES AND INTERSECTION 24 IMPROVEMENT, PA 18 AT TYLERDALE, 25 JEFFERSON AND WYLIE INTERSECTION, CITY 26 OF WASHINGTON 1,190,000 27 (BASE PROJECT ALLOCATION - $1,000,000) 28 (LAND ALLOCATION - $100,000) 29 (DESIGN AND CONTINGENCIES - $90,000) 30 (4) SR 19, HIGHWAY RESTORATION, US 19 FROM 20080S1504B2377 - 117 -
1 CONKLIN ROAD TO PA 519, NORTH STRABANE 2 TOWNSHIP 97,000 3 (LAND ALLOCATION - $1,000) 4 (DESIGN AND CONTINGENCIES - $96,000) 5 (5) SR 19, INTERSECTION IMPROVEMENT, 6 INTERSECTION SR 19 AND GLENNCANNON 7 DRIVE, NORTH STRABANE TOWNSHIP 100,000 8 (BASE PROJECT ALLOCATION - $100,000) 9 (6) SR 40, HIGHWAY RESTORATION, SR 4, 10 SEGMENT 0670 FROM BEALLSVILLE TO 11 CENTERVILLE, CENTERVILLE BOROUGH, WEST 12 PIKE RUN TOWNSHIP 6,000,000 13 (BASE PROJECT ALLOCATION - $6,000,000) 14 (7) SR 519, HIGHWAY RESTORATION, PA 519 15 FROM US 40 TO I-70, BETTERMENT, NORTH 16 BETHLEHEM AND SOMERSET TOWNSHIPS 147,000 17 (LAND ALLOCATION - $1,000) 18 (DESIGN AND CONTINGENCIES - $146,000) 19 (8) SR 70, RECONSTRUCTION, I-70, SEGMENT 20 0040 TO SEGMENT 0100 AND SEGMENT 0041 21 TO SEGMENT 0101, CLAYSVILLE BOROUGH, 22 BUFFALO AND DONEGAL TOWNSHIPS 2,710,000 23 (BASE PROJECT ALLOCATION - $2,410,000) 24 (DESIGN AND CONTINGENCIES - $300,000) 25 (9) SR 70, RESTORATION, I-70, SEGMENT 0214 26 TO SEGMENT 0305, SOMERSET AND SOUTH 27 STRABANE TOWNSHIPS 775,000 28 (BASE PROJECT ALLOCATION - $775,000) 29 (10) SR 70, INTERSTATE RESTORATION, 30 REHABILITATION AND REPAIR ON 20080S1504B2377 - 118 -
1 SUBSTRUCTURES OF 3 BRIDGES, I-70, 2 SEGMENT 0180 TO SEGMENT 0215, SOUTH 3 STRABANE TOWNSHIP 480,000 4 (BASE PROJECT ALLOCATION - $480,000) 5 (11) VARIOUS ROUTES, MISCELLANEOUS ITS 6 IMPROVEMENTS AND PURCHASES, COUNTYWIDE, 7 VARIOUS MUNICIPALITIES 115,000 8 (BASE PROJECT ALLOCATION - $80,000) 9 (DESIGN AND CONTINGENCIES - $35,000) 10 (12) SR 136, INTERSECTION IMPROVEMENT, 11 REALIGNMENT OF SR 136 886,000 12 (BASE PROJECT ALLOCATION - $760,000) 13 (LAND ALLOCATION - $44,000) 14 (DESIGN AND CONTINGENCIES - $82,000) 15 (13) I-70, INTERSTATE RESTORATION AND 16 RECONSTRUCTION 40,000,000 17 (BASE PROJECT ALLOCATION - $40,000,000) 18 (14) I-79, INTERSTATE RESTORATION AND 19 RECONSTRUCTION 23,400,000 20 (BASE PROJECT ALLOCATION - $23,400,000) 21 (15) PA 136, INTERSECTION IMPROVEMENT 3,363,000 22 (BASE PROJECT ALLOCATION - $2,005,000) 23 (LAND ALLOCATION - $689,000) 24 (DESIGN AND CONTINGENCIES - $649,000) 25 (16) SR 1002, INTERSECTION IMPROVEMENT AND 26 SIGNALIZATION 1,581,000 27 (BASE PROJECT ALLOCATION - $1,515,000) 28 (DESIGN AND CONTINGENCIES - $66,000) 29 (17) SR 19, HIGHWAY RESTORATION 1,120,000 30 (BASE PROJECT ALLOCATION - $1,120,000) 20080S1504B2377 - 119 -
1 (18) SR 519, INTERSECTION IMPROVEMENT, 2 TRAFFIC SIGNAL AND TURNING LANES 258,000 3 (BASE PROJECT ALLOCATION - $169,000) 4 (LAND ALLOCATION - $26,000) 5 (DESIGN AND CONTINGENCIES - $63,000) 6 SECTION 364. WAYNE COUNTY. 7 PROJECTS ARE AS FOLLOWS: 8 (1) SR 84, ITS IMPROVEMENTS AND PURCHASES, 9 I-84 CORRIDOR AND I-380 CORRIDOR, 10 VARIOUS MUNICIPALITIES 240,000 11 (BASE PROJECT ALLOCATION - $200,000) 12 (DESIGN AND CONTINGENCIES - $40,000) 13 (2) I-84, INTERSTATE RESTORATION AND 14 RECONSTRUCTION 5,800,000 15 (BASE PROJECT ALLOCATION - $5,800,000) 16 (3) SR 590, INTERSECTION IMPROVEMENT 1,820,000 17 (BASE PROJECT ALLOCATION - $1,560,000) 18 (DESIGN AND CONTINGENCIES - $260,000) 19 (4) SR 1023, RESTORATION, ROADWAY AND 20 SLOPE REPAIR 650,000 21 (BASE PROJECT ALLOCATION - $600,000) 22 (LAND ALLOCATION - $50,000) 23 SECTION 365. WESTMORELAND COUNTY. 24 PROJECTS ARE AS FOLLOWS: 25 (1) SR 1045, ENVIRONMENTAL MITIGATION, SR 26 1045, STREAM MITIGATION, UNITY 27 TOWNSHIP 300,000 28 (BASE PROJECT ALLOCATION - $300,000) 29 (2) SR 130, INTERSECTION IMPROVEMENT, SR 30 130 AND COLLEGE AVENUE, HEMPFIELD 20080S1504B2377 - 120 -
1 TOWNSHIP AND CITY OF JEANNETTE 125,000 2 (BASE PROJECT ALLOCATION - $125,000) 3 (3) SR 30, HIGHWAY RESTORATION, SR 30 FROM 4 THEATER STREET TO PA 217, DERRY AND 5 UNITY TOWNSHIPS 3,500,000 6 (BASE PROJECT ALLOCATION - $3,500,000) 7 (4) SR 30, HIGHWAY RESTORATION, US 30 8 BETTERMENT, HEMPFIELD TOWNSHIP 6,200,000 9 (BASE PROJECT ALLOCATION - $6,200,000) 10 (5) SR 30, WIDEN TO PROVIDE CENTER AND 11 LEFT TURNING LANE AND ADD SIGNALS, SR 12 30 CORRIDOR FROM IRWIN BRIDGE TO LOWER 13 CIRCLEVILLE, IRWIN BOROUGH AND NORTH 14 HUNTINGDON TOWNSHIP 800,000 15 (BASE PROJECT ALLOCATION - $600,000) 16 (LAND ALLOCATION - $120,000) 17 (DESIGN AND CONTINGENCIES - $80,000) 18 (6) SR 30, HIGHWAY RESTORATION, SR 30 FROM 19 ROBBINS STATION ROAD TO CENTRAL AVENUE, 20 IRWIN BOROUGH, NORTH HUNTINGDON 21 TOWNSHIP 2,800,000 22 (BASE PROJECT ALLOCATION - $2,800,000) 23 (7) SR 30, WIDEN, ADD LANE, SR 30, 24 ALLEGHENY COUNTY LINE TO LEGER ROAD, SR 25 4019, NORTH HUNTINGDON TOWNSHIP 920,000 26 (BASE PROJECT ALLOCATION - $700,000) 27 (LAND ALLOCATION - $160,000) 28 (DESIGN AND CONTINGENCIES - $60,000) 29 (8) SR 30, WIDEN TO PROVIDE CENTER AND 30 LEFT TURNING LANE AND ADD SIGNALS WHERE 20080S1504B2377 - 121 -
1 WARRANTED, ADD LANE, SR 30 FROM SR 4019 2 TO MALTS LANE, NORTH HUNTINGDON 3 TOWNSHIP 300,000 4 (BASE PROJECT ALLOCATION - $100,000) 5 (LAND ALLOCATION - $120,000) 6 (DESIGN AND CONTINGENCIES - $80,000) 7 (9) SR 780, INTERSECTION IMPROVEMENT, NEW 8 TRAFFIC SIGNAL, PA 780 AND PA 380 9 INTERSECTION, WASHINGTON TOWNSHIP 315,000 10 (BASE PROJECT ALLOCATION - $240,000) 11 (DESIGN AND CONTINGENCIES - $75,000) 12 (10) I-70, INTERSTATE RESTORATION AND 13 RECONSTRUCTION 16,600,000 14 (BASE PROJECT ALLOCATION - $16,600,000) 15 (11) PA 66, INTERSECTION IMPROVEMENT, 16 SIGNAL IMPROVEMENTS AND ADD LANE 2,463,000 17 (BASE PROJECT ALLOCATION - $1,839,000) 18 (LAND ALLOCATION - $260,000) 19 (DESIGN AND CONTINGENCIES - $364,000) 20 (12) SR 51, INTERSECTION IMPROVEMENT, ADD 21 LEFT TURNING LANES 3,823,000 22 (BASE PROJECT ALLOCATION - $2,813,000) 23 (LAND ALLOCATION - $306,000) 24 (DESIGN AND CONTINGENCIES - $704,000) 25 SECTION 366. WYOMING COUNTY. 26 PROJECTS ARE AS FOLLOWS: 27 (1) US 6, ITS IMPROVEMENTS AND PURCHASES, 28 US 6 CORRIDOR, VARIOUS MUNICIPALITIES 120,000 29 (BASE PROJECT ALLOCATION - $100,000) 30 (DESIGN AND CONTINGENCIES - $20,000) 20080S1504B2377 - 122 -
1 (2) SR 4015, HIGHWAY RESTORATION, SLIDE 2 REPAIR 117,000 3 (LAND ALLOCATION - $117,000) 4 (3) SR 2007, RESTORATION, ROADWAY AND 5 SLOPE REPAIR 409,000 6 (BASE PROJECT ALLOCATION - $409,000) 7 (4) SR 4001, RESTORATION, ROADWAY AND 8 SLOPE REPAIR 288,000 9 (BASE PROJECT ALLOCATION - $288,000) 10 SECTION 367. YORK COUNTY. 11 PROJECTS ARE AS FOLLOWS: 12 (1) SR 30, HIGHWAY RESTORATION, CONCRETE 13 REHABILITATION, US 30, PAVEMENT 14 GRINDING FROM PA 74 TO I-83, MANCHESTER 15 AND WEST MANCHESTER TOWNSHIPS AND CITY 16 OF YORK 2,995,000 17 (BASE PROJECT ALLOCATION - $2,920,000) 18 (DESIGN AND CONTINGENCIES - $75,000) 19 (2) SR 83, INTERCHANGE IMPROVEMENT, I-83, 20 EXIT 19 AND PA 462 INTERCHANGE, 21 SPRINGETTSBURY TOWNSHIP 100,000 22 (DESIGN AND CONTINGENCIES - $100,000) 23 (3) I-83, INTERSTATE RESTORATION AND 24 RECONSTRUCTION 39,000,000 25 (BASE PROJECT ALLOCATION - $39,000,000) 26 (4) PA 124, SAFETY IMPROVEMENT, WIDEN 1,374,000 27 (BASE PROJECT ALLOCATION - $1,374,000) 28 (5) PA 124, SAFETY IMPROVEMENT, SHOULDER 29 IMPROVEMENT AND REDUCE S CURVE 365,000 30 (BASE PROJECT ALLOCATION - $323,000) 20080S1504B2377 - 123 -
1 (DESIGN AND CONTINGENCIES - $42,000) 2 (6) PA 24, SAFETY IMPROVEMENT, WIDEN AND 3 ADD LANES 5,805,000 4 (BASE PROJECT ALLOCATION - $969,000) 5 (LAND ALLOCATION - $74,000) 6 (DESIGN AND CONTINGENCIES - $4,762,000) 7 (7) SR 74, CORRIDOR SAFETY IMPROVEMENT, 8 WIDEN AND OVERLAY, ADD CENTER TURN 9 LANE 86,000 10 (BASE PROJECT ALLOCATION - $86,000) 11 (8) SR 83, INTERCHANGE IMPROVEMENT, 12 LENGTHEN RAMPS 200,000 13 (LAND ALLOCATION - $200,000) 14 SECTION 368. STATEWIDE PROJECTS. 15 PROJECTS ARE AS FOLLOWS: 16 (1) VARIOUS ROUTES, CAPITALIZATION OF 17 PENNSYLVANIA INFRASTRUCTURE BANK, 18 VARIOUS PROJECTS, STATEWIDE 90,000,000 19 (BASE PROJECT ALLOCATION - $90,000,000) 20 (2) VARIOUS ROUTES, INTERSECTION OF ALL 21 STATE ROUTES WITH OTHER STATE ROUTES, 22 INSTALL OR REPLACE CURB CUT RAMPS AS 23 REQUIRED BY THE AMERICANS WITH 24 DISABILITIES ACT, VARIOUS PROJECTS, 25 STATEWIDE 400,000,000 26 (BASE PROJECT ALLOCATION - 27 $400,000,000) 28 CHAPTER 5 29 (RESERVED) 30 CHAPTER 7 20080S1504B2377 - 124 -
1 MISCELLANEOUS PROVISIONS 2 SECTION 701. FEDERAL FUNDS. 3 ALL MONEYS RECEIVED FROM THE FEDERAL GOVERNMENT FOR THE 4 CONSTRUCTION OF THE PROJECTS SPECIFICALLY ITEMIZED IN THIS ACT 5 ARE ALSO HEREBY APPROPRIATED FOR THOSE PROJECTS. 6 SECTION 702. ALLOCATION OF FUNDS. 7 WHENEVER AS DETERMINED BY THE DEPARTMENT OF TRANSPORTATION 8 THAT THE FULL ESTIMATED FINANCIAL COSTS OF THE PROJECTS ITEMIZED 9 IN THIS ACT ARE NOT NECESSARY FOR THE PROPER DESIGN, ACQUISITION 10 OR CONSTRUCTION OF SUCH PROJECTS, THE EXCESS FUNDS NO LONGER 11 REQUIRED MAY BE ALLOCATED BY THE DEPARTMENT OF TRANSPORTATION TO 12 INCREASE THE ESTIMATED COSTS OF ANY ONE OR MORE OF THE PROJECTS 13 SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET. 14 SECTION 703. ESTIMATED USEFUL LIFE. 15 THE GENERAL ASSEMBLY STATES THAT THE ESTIMATED USEFUL LIFE OF 16 THE HIGHWAY CAPITAL PROJECTS ITEMIZED IN THIS ACT IS 30 YEARS. 17 SECTION 704. EFFECTIVE DATE. 18 THIS ACT SHALL TAKE EFFECT IMMEDIATELY. F17L86RLE/20080S1504B2377 - 125 -