HOUSE AMENDED PRIOR PRINTER'S NOS. 2218, 2376, 2411 PRINTER'S NO. 2474
No. 1503 Session of 2008
INTRODUCED BY MADIGAN AND STOUT, JUNE 19, 2008
AS AMENDED ON THIRD CONSIDERATION, HOUSE OF REPRESENTATIVES, OCTOBER 6, 2008
A SUPPLEMENT 1 To the act of December 8, 1982 (P.L.848, No.235), entitled "An 2 act providing for the adoption of capital projects related to 3 the repair, rehabilitation or replacement of highway bridges 4 to be financed from current revenue or by the incurring of 5 debt and capital projects related to highway and safety 6 improvement projects to be financed from current revenue of 7 the Motor License Fund," itemizing additional State and local 8 bridge projects. 9 The General Assembly of the Commonwealth of Pennsylvania 10 hereby enacts as follows: 11 Section 1. Short title. 12 This act shall be known and may be cited as the Highway- 13 Railroad and Highway Bridge Capital Budget Supplemental Act for 14 2008-2009. 15 Section 2. Definitions. 16 The following words and phrases when used in this act shall 17 have the meanings given to them in this section unless the 18 context clearly indicates otherwise: 19 "Capital project." A capital project as defined in section
1 302 of the act of February 9, 1999 (P.L.1, No.1), known as the 2 Capital Facilities Debt Enabling Act, and shall include a county 3 or municipal bridge rehabilitation, replacement or improvement 4 project as set forth in this act. 5 "Department." The Department of Transportation of the 6 Commonwealth. 7 "Secretary." The Secretary of Transportation of the 8 Commonwealth. 9 Section 3. Total authorization for bridge projects. 10 (a) Total projects.--The total authorization for the costs 11 of the projects itemized pursuant to this act and to be financed 12 from current revenue or by the incurring of debt shall be 13 $1,453,720,000 $1,939,796,000 $1,966,906,000. <-- 14 (b) State projects.--The authorization for capital projects 15 in the category of highway bridge projects and forestry and 16 State park bridge projects to be constructed by the Department 17 of Transportation, its successors or assigns, and to be financed 18 by the incurring of debt or from current revenue, itemized in 19 this act under the category of State bridges, shall be 20 $1,150,048,000 $1,523,916,000 $1,538,916,000. <-- 21 (c) Non-State projects.--The authorization for non-State 22 highway bridge projects to be constructed by municipalities and 23 to be financed in part with grants not exceeding 80% of the non- 24 Federal share of the costs made to the local government 25 municipalities by the department from current revenues itemized 26 in this act under the category of local bridges, shall be 27 $303,672,000 $415,880,000 $427,990,000. <-- 28 Section 4. Itemization of bridge projects. 29 The individual capital projects in the category of highway 30 projects to be constructed by the Department of Transportation, 20080S1503B2474 - 2 -
1 its successors or assigns, and to be financed from current
2 revenue or by the incurring of debt are hereby itemized,
3 together with their estimated financial costs, in the following
4 sections.
5 Section 5. Adams County.
6 (a) Local Bridges (Reserved) <--
7 (A) LOCAL BRIDGES <--
8 (1) CUMBERLAND TOWNSHIP, T-348 OVER CSX
9 TRANSPORTATION, BRIDGE REPLACEMENT 1,115,000
10 (BASE PROJECT ALLOCATION - $940,000)
11 (LAND ALLOCATION - $75,000)
12 (DESIGN AND CONTINGENCIES - $100,000)
13 (2) CUMBERLAND AND FREEDOM TOWNSHIPS, T-
14 402 OVER MARSH CREEK, BRIDGE
15 REPLACEMENT 2,175,000
16 (BASE PROJECT ALLOCATION - $1,600,000)
17 (LAND ALLOCATION - $75,000)
18 (DESIGN AND CONTINGENCIES - $500,000)
19 (b) State Bridges
20 (1) SR 0030, East King Street over Beaver
21 Creek, Abbottstown Borough, Bridge
22 Replacement 420,000
23 (Base Project Allocation - $300,000)
24 (Land Allocation - $20,000)
25 (Design and Contingencies - $100,000)
26 (2) SR 0194, PA 194 over Branch of Beaver
27 Creek, Berwick Township, Bridge
28 Replacement 187,000
29 (Land Allocation - $24,000)
30 (Design and Contingencies - $163,000)
20080S1503B2474 - 3 -
1 (3) SR 0194, PA 194, Bridge No.125 over 2 Tributary of Beaver Creek, Berwick 3 Township, Bridge Replacement 117,000 4 (Land Allocation - $15,000) 5 (Design and Contingencies - $102,000) 6 (4) SR 0194, PA 194, Bridge No.126 over 7 Tributary of Beaver Creek, Berwick 8 Township, Bridge Replacement 131,000 9 (Land Allocation - $17,000) 10 (Design and Contingencies - $114,000) 11 (5) SR 4014 over Tributary of Conewago 12 Creek, Butler Township, Bridge 13 Replacement 70,000 14 (Base Project Allocation - $70,000) 15 (6) SR 3004, Marsh Creek Road over SR 16 0015, Cumberland Township, Bridge 17 Rehabilitation 230,000 18 (Base Project Allocation - $175,000) 19 (Land Allocation - $5,000) 20 (Design and Contingencies - $50,000) 21 (7) SR 0134, Taneytown Road over SR 0015, 22 Cumberland Township, Bridge 23 Rehabilitation 230,000 24 (Base Project Allocation - $175,000) 25 (Land Allocation - $5,000) 26 (Design and Contingencies - $50,000) 27 (8) SR 0016, Waynesboro Pike over Miney 28 Branch of Toms Creek, Hamiltonban 29 Township, Bridge Rehabilitation 1,700,000 30 (Base Project Allocation - $745,000) 20080S1503B2474 - 4 -
1 (Design and Contingencies - $955,000) 2 (9) SR 1009 over Tributary of Mud Run, 3 Huntington Township, Bridge 4 Replacement 70,000 5 (Base Project Allocation - $70,000) 6 (10) PA 94 over Bermudian Creek, Latimore 7 Township, Bridge Rehabilitation 1,755,000 8 (Base Project Allocation - $1,600,000) 9 (Land Allocation - $55,000) 10 (Design and Contingencies - $100,000) 11 (11) SR 1007 over Bermudian Creek, 12 Latimore Township, Bridge 13 Rehabilitation 626,000 14 (Base Project Allocation - $500,000) 15 (Land Allocation - $5,000) 16 (Design and Contingencies - $121,000) 17 (12) SR 0016, Waynesboro Parkway over Toms 18 Creek, Liberty Township, Bridge 19 Rehabilitation 3,622,000 20 (Base Project Allocation - $1,716,000) 21 (Design and Contingencies - $1,906,000) 22 (13) SR 2001, Bon-Ox Road over Stambaugh 23 Run, Mt. Pleasant Township, Bridge 24 Rehabilitation 647,000 25 (Base Project Allocation - $647,000) 26 (14) SR 2001 over Tributary of White Run, 27 Mt. Pleasant Township, Bridge 28 Replacement 761,000 29 (Base Project Allocation - $389,000) 30 (Land Allocation - $40,000) 20080S1503B2474 - 5 -
1 (Design and Contingencies - $332,000) 2 (15) SR 3003, Hunterstown Road over SR 3 0015, Straban Township, Bridge 4 Rehabilitation 230,000 5 (Base Project Allocation - $175,000) 6 (Land Allocation - $5,000) 7 (Design and Contingencies - $50,000) 8 (16) SR 0394, PA 394 over Tributary of 9 Beaver Creek, Straban Township, Bridge 10 Replacement 770,000 11 (Base Project Allocation - $550,000) 12 (Land Allocation - $40,000) 13 (Design and Contingencies - $180,000) 14 (17) SR 0394 over SR 0015, Straban 15 Township, Bridge Rehabilitation 230,000 16 (Base Project Allocation - $175,000) 17 (Land Allocation - $5,000) 18 (Design and Contingencies - $50,000) 19 (18) SR 3001, Old Harrisburg Road, Bridge 20 No.270 over Tributary of Conewago 21 Creek, Straban Township, Bridge 22 Replacement 70,000 23 (Base Project Allocation - $70,000) 24 (19) SR 3001, Old Harrisburg Road, Bridge 25 No.271 over Tributary of Conewago 26 Creek, Straban Township, Bridge 27 Replacement 70,000 28 (Base Project Allocation - $70,000) 29 Section 6. Allegheny County. 30 (a) Local Bridges 20080S1503B2474 - 6 -
1 (1) Ben Avon Borough, Spruce Street over 2 Spruce Run, Bridge Replacement 500,000 3 (Base Project Allocation - $312,000) 4 (Land Allocation - $12,000) 5 (Design and Contingencies - $176,000) 6 (2) Carnegie Borough, Carothers Street 7 over Chartiers Creek, Bridge 8 Rehabilitation 1,946,000 9 (Base Project Allocation - $1,520,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $416,000) 12 (3) City of Pittsburgh, Sixth Street over 13 Allegheny River, 10th Street Bypass, 14 Bridge Rehabilitation 362,000 15 (Base Project Allocation - $275,000) 16 (Design and Contingencies - $87,000) 17 (4) City of Pittsburgh, Seventh Street 18 over Allegheny River, 10th Street 19 Bypass, Bridge Rehabilitation 362,000 20 (Base Project Allocation - $275,000) 21 (Design and Contingencies - $87,000) 22 (5) City of Pittsburgh, Ninth Street over 23 Allegheny River, 10th Street Bypass, 24 Bridge Rehabilitation 362,000 25 (Base Project Allocation - $275,000) 26 (Design and Contingencies - $87,000) 27 (6) City of Pittsburgh, South Tenth Street 28 over Railroad and I-376, Bridge 29 Rehabilitation 1,553,000 30 (Base Project Allocation - $1,350,000) 20080S1503B2474 - 7 -
1 (Land Allocation - $8,000) 2 (Design and Contingencies - $195,000) 3 (7) City of Pittsburgh, Chartiers Avenue 4 over PAT Airport Busway, Bridge 5 Replacement 1,178,000 6 (Base Project Allocation - $900,000) 7 (Land Allocation - $8,000) 8 (Design and Contingencies - $270,000) 9 (8) City of Pittsburgh, South Negley 10 Avenue, over Railroad and PAT Busway, 11 Bridge Replacement 1,178,000 12 (Base Project Allocation - $900,000) 13 (Land Allocation - $8,000) 14 (Design and Contingencies - $270,000) 15 (9) Collier Township, Thoms Run Road over 16 Thoms Run, Bridge Replacement 580,000 17 (Base Project Allocation - $352,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $208,000) 20 (10) Crescent Township, Access Road over 21 Flaugherty Run, Bridge Rehabilitation 540,000 22 (Base Project Allocation - $360,000) 23 (Land Allocation - $12,000) 24 (Design and Contingencies - $168,000) 25 (11) Fawn Township, Dawson Road over Bull 26 Creek, Bridge Replacement 758,000 27 (Base Project Allocation - $552,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $196,000) 30 (12) Findlay Township, Imperial - 20080S1503B2474 - 8 -
1 Burgettstown Road over North Fork 2 Montour Run, Bridge rehabilitation 546,000 3 (Base Project Allocation - $340,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $196,000) 6 (13) Findlay Township, Steubenville - 7 Enlow Road No.04 over Montour Run, 8 Bridge Replacement 526,000 9 (Base Project Allocation - $308,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $168,000) 12 (14) Forward Township, Pangburn Hollow 13 Road No.03 over Perry Mill Run, Bridge 14 Replacement 104,000 15 (Base Project Allocation - $84,000) 16 (Land Allocation - $2,000) 17 (Design and Contingencies - $18,000) 18 (15) Forward Township, Pangburn Hollow 19 Road No.08 over Perry Mill Run, Bridge 20 Replacement 104,000 21 (Base Project Allocation - $84,000) 22 (Land Allocation - $2,000) 23 (Design and Contingencies - $18,000) 24 (16) Forward Township, Pangburn Hollow 25 Road No.13 over Perry Mill Run, Bridge 26 Replacement 104,000 27 (Base Project Allocation - $84,000) 28 (Land Allocation - $2,000) 29 (Design and Contingencies - $18,000) 30 (17) Forward Township, Pangburn Hollow 20080S1503B2474 - 9 -
1 Road No.04 over Perry Mill Run, Bridge 2 Replacement 382,000 3 (Base Project Allocation - $300,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $72,000) 6 (18) Forward Township, Pangburn Hollow 7 Road No.07 over Perry Mill Run, Bridge 8 Replacement 104,000 9 (Base Project Allocation - $84,000) 10 (Land Allocation - $2,000) 11 (Design and Contingencies - $18,000) 12 (19) Forward Township, Pangburn Hollow 13 Road No.09 over Perry Mill Run, Bridge 14 Replacement 104,000 15 (Base Project Allocation - $84,000) 16 (Land Allocation - $2,000) 17 (Design and Contingencies - $18,000) 18 (20) Indiana Township, McClelland Road 19 over Deer Creek, Bridge Replacement 792,000 20 (Base Project Allocation - $566,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $216,000) 23 (21) Indiana Township, Jacoby Road over 24 Little Deer Creek, Bridge Replacement 918,000 25 (Base Project Allocation - $600,000) 26 (Land Allocation - $18,000) 27 (Design and Contingencies - $300,000) 28 (22) McCandless Township, Highland Road 29 over Lowries Run East Branch, Bridge 30 Replacement 296,000 20080S1503B2474 - 10 -
1 (Base Project Allocation - $220,000) 2 (Land Allocation - $8,000) 3 (Design and Contingencies - $68,000) 4 (23) Moon Township, Scott Road over 5 Montour Run, Bridge Replacement 618,000 6 (Base Project Allocation - $300,000) 7 (Land Allocation - $14,000) 8 (Design and Contingencies - $304,000) 9 (24) North Braddock Borough, Centre Avenue 10 over O'Connell Boulevard, Bridge 11 Rehabilitation 3,633,000 12 (Base Project Allocation - $3,450,000) 13 (Land Allocation - $3,000) 14 (Design and Contingencies - $180,000) 15 (25) Pine Township, Ice Rink Road over 16 Pine Creek North Branch, Bridge 17 Replacement 512,000 18 (Base Project Allocation - $312,000) 19 (Design and Contingencies - $200,000) 20 (26) Plum Borough, Stotler Road over Plum 21 Creek, Bridge Replacement 652,000 22 (Base Project Allocation - $384,000) 23 (Land Allocation - $12,000) 24 (Design and Contingencies - $256,000) 25 (27) Ross Township, Bellevue Road over SR 26 0279, Bridge Rehabilitation 53,000 27 (Design and Contingencies - $53,000) 28 (28) Ross Township, Cornell Avenue over I- 29 279 Parkway North Bound, Spruce Run, 30 Bridge Rehabilitation 1,553,000 20080S1503B2474 - 11 -
1 (Base Project Allocation - $1,425,000) 2 (Land Allocation - $8,000) 3 (Design and Contingencies - $120,000) 4 (29) Shaler Township, Elfinwild Road over 5 Pine Creek, Bridge Rehabilitation 708,000 6 (Base Project Allocation - $424,000) 7 (Land Allocation - $12,000) 8 (Design and Contingencies - $272,000) 9 (30) South Park Township, SR 7219 No.9 10 LC09 over Licks Run, Bridge 11 Rehabilitation 360,000 12 (Base Project Allocation - $280,000) 13 (Land Allocation - $8,000) 14 (Design and Contingencies - $72,000) 15 (31) West Elizabeth Borough, Scotia Hollow 16 Road Bridge XC01 over Scotia Hollow 17 Run, Bridge Replacement 354,000 18 (Base Project Allocation - $272,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $72,000) 21 (32) West Mifflin Borough, Homeville Road 22 No.05 over Thompson Run, Union 23 Railroad, Bridge Rehabilitation 780,000 24 (Base Project Allocation - $600,000) 25 (Land Allocation - $15,000) 26 (Design and Contingencies - $165,000) 27 (33) Oakdale Borough, First Street over 28 North Branch Creek, Bridge 29 Rehabilitation 1,000,000 30 (Base Project Allocation - $1,000,000) 20080S1503B2474 - 12 -
1 (34) Findlay Township, Aten Road over 2 Industry Drive, Bridge Replacement 5,000,000 3 (Base Project Allocation - $5,000,000) 4 (35) North Fayette Township, Hans Road 5 over North Branch of Robinson Run, 6 Bridge Replacement 97,000 7 (Base Project Allocation - $97,000) 8 (36) Collier Township, Steen Road over 9 Chartiers Creek, Bridge Rehabilitation 20,000 10 (Base Project Allocation - $20,000) 11 (37) Emsworth Borough, Gibson Street over 12 Lowries Run, Bridge Replacement 2,500,000 13 (Base Project Allocation - $2,500,000) 14 (38) Emsworth Borough, Herron Avenue over 15 Lowries Run, Bridge Replacement 3,000,000 16 (Base Project Allocation - $3,000,000) 17 (39) Edgeworth Borough, Beaver Road over 18 Little Sewickley Creek, Bridge 19 Rehabilitation 100,000 20 (Base Project Allocation - $100,000) 21 (40) South Park Township/Jefferson Hills 22 Borough, Wilson Road over Lick Run, 23 Bridge Rehabilitation 100,000 24 (Base Project Allocation - $100,000) 25 (41) South Park Township/Jefferson Hills 26 Borough, McElheny Road over Lick Run, 27 Bridge Replacement 200,000 28 (Base Project Allocation - $200,000) 29 (42) Leetsdale Borough, Lee Street over 30 Norfolk Southern Railroad, Bridge 20080S1503B2474 - 13 -
1 Replacement 5,000,000 2 (Base Project Allocation - $5,000,000) 3 (43) Ross Township, Brookview Lane over 4 Girty's Run, Bridge Rehabilitation 310,000 5 (Base Project Allocation - $310,000) 6 (44) Ross Township, Nelson Run Road over 7 Nelson Run, Bridge Rehabilitation 85,000 8 (Base Project Allocation - $85,000) 9 (45) Ross Township, Harriett Drive over 10 Girty's Run, Bridge Rehabilitation 150,000 11 (Base Project Allocation - $150,000) 12 (46) Etna Borough, Greeley Avenue over 13 Pine Creek, Bridge Rehabilitation 648,000 14 (Base Project Allocation - $648,000) 15 (47) Etna Borough, Dewey Street over Pine 16 Creek, Bridge Rehabilitation 386,000 17 (Base Project Allocation - $386,000) 18 (48) Marshall Township, Northgate Drive 19 over Brush Creek, Bridge 20 Rehabilitation 500,000 21 (Base Project Allocation - $500,000) 22 (49) Dravosburg Borough, McKeesport City 23 and Glassport Borough, W.D. Mansfield 24 Bridge, Pittsburgh-McKeesport Boulevard 25 over Monongahela River, Bridge 26 Rehabilitation 35,000,000 27 (Base Project Allocation - $30,000,000) 28 (Design and Contingencies - $5,000,000) 29 (50) HARMER TOWNSHIP, RICH HILL ROAD <-- 30 BRIDGE NO.4 OVER DEER CREEK, BRIDGE 20080S1503B2474 - 14 -
1 REPLACEMENT 648,000 2 (BASE PROJECT ALLOCATION - $480,000) 3 (DESIGN AND CONTINGENCIES - $168,000) 4 (51) NORTH BRADDOCK BOROUGH, CENTER AVENUE 5 - DK01, DOOKER'S HOLLOW BRIDGE OVER 6 O'CONNELL BOULEVARD, BRIDGE 7 REHABILITATION 1,960,000 8 (BASE PROJECT ALLOCATION - $1,825,000) 9 (LAND ALLOCATION - $18,000) 10 (DESIGN AND CONTINGENCIES - $117,000) 11 (52) HAMPTON TOWNSHIP, DUNCAN AVENUE 12 BRIDGE OVER GOURDHEAD RUN BASIN, BRIDGE 13 REPLACEMENT 1,000,000 14 (BASE PROJECT ALLOCATION - $1,000,000) 15 (b) State Bridges 16 (1) SR 3098, Glass Run Road over Glass 17 Run, Baldwin Township, Bridge 18 Replacement 473,000 19 (Base Project Allocation - $367,000) 20 (Land Allocation - $18,000) 21 (Design and Contingencies - $88,000) 22 (2) SR 4036, Big Sewickley Road over Big 23 Sewickley Creek, Braddock Hills 24 Borough, Bridge Rehabilitation 958,000 25 (Base Project Allocation - $938,000) 26 (Design and Contingencies - $20,000) 27 (3) SR 0030, Ardmore Boulevard, Bridge 28 No.671 over LR 639, Electric Avenue, 29 Chalfant Borough, Bridge Replacement 1,005,000 30 (Base Project Allocation - $800,000) 20080S1503B2474 - 15 -
1 (Land Allocation - $25,000) 2 (Design and Contingencies - $180,000) 3 (4) SR 0030, Ardmore Boulevard, Bridge 4 No.672 over LR 639, Electric Avenue, 5 Chalfant Borough, Bridge Replacement 1,005,000 6 (Base Project Allocation - $800,000) 7 (Land Allocation - $25,000) 8 (Design and Contingencies - $180,000) 9 (5) SR 2085, Birmingham over CSX Railroad 10 and Monongahela River, City of 11 Pittsburgh, Bridge Rehabilitation 1,010,000 12 (Base Project Allocation - $1,000,000) 13 (Design and Contingencies - $10,000) 14 (6) SR 0837, Eighth Avenue over Ramp C, 15 Ramp D and local streets, City of 16 Pittsburgh, Bridge Rehabilitation 350,000 17 (Base Project Allocation - $350,000) 18 (7) SR 8059, Ramp A to SR 0885 Southbound 19 over Ramp C and Ramp D, City of 20 Pittsburgh, Bridge Rehabilitation 350,000 21 (Base Project Allocation - $350,000) 22 (8) SR 8059, Ramp B to SR 0885 Northbound 23 over Ramp C and Ramp D, City of 24 Pittsburgh, Bridge Rehabilitation 350,000 25 (Base Project Allocation - $350,000) 26 (9) SR 8065, Ramp E Entrance over B & O 27 Railroad, I-376, Ramp V, City of 28 Pittsburgh, Bridge Rehabilitation 1,010,000 29 (Base Project Allocation - $1,000,000) 30 (Design and Contingencies - $10,000) 20080S1503B2474 - 16 -
1 (10) SR 8065, Ramp F Exit over CSX 2 Railroad, I-376, Ramp V, City of 3 Pittsburgh, Bridge Rehabilitation 1,010,000 4 (Base Project Allocation - $1,000,000) 5 (Design and Contingencies - $10,000) 6 (11) SR 2085 over 2nd Avenue, Parkway 7 East, Ramp T, City of Pittsburgh, 8 Bridge Rehabilitation 1,010,000 9 (Base Project Allocation - $1,000,000) 10 (Design and Contingencies - $10,000) 11 (12) I-279, Bridge No.1068 over LR 805, 12 Ramp J, HOV Lane, City of Pittsburgh, 13 Bridge Rehabilitation 554,000 14 (Base Project Allocation - $528,000) 15 (Design and Contingencies - $26,000) 16 (13) I-279, Bridge No.1069 over SR 4003, 17 SR 4009, Ramp J, City of Pittsburgh, 18 Bridge Rehabilitation 131,000 19 (Base Project Allocation - $125,000) 20 (Design and Contingencies - $6,000) 21 (14) I-279, Bridge No.2032 over LR 805, 22 Ramp J, LR 2302, City of Pittsburgh, 23 Bridge Rehabilitation 207,000 24 (Base Project Allocation - $197,000) 25 (Design and Contingencies - $10,000) 26 (15) I-279 Northbound over Suffolk Street, 27 City of Pittsburgh, Bridge 28 Rehabilitation 231,000 29 (Base Project Allocation - $220,000) 30 (Design and Contingencies - $11,000) 20080S1503B2474 - 17 -
1 (16) SR 8102, I-279 and McKnight Road, 2 Ramp I over LR 805, Evergreen Road, 3 City of Pittsburgh, Bridge 4 Rehabilitation 70,000 5 (Base Project Allocation - $66,000) 6 (Design and Contingencies - $4,000) 7 (17) SR 8102, I-279 and McKnight Road, 8 Ramp J over SR 4003, Evergreen Road, 9 City of Pittsburgh, Bridge 10 Rehabilitation 81,000 11 (Base Project Allocation - $77,000) 12 (Design and Contingencies - $4,000) 13 (18) SR 8102, I-279 and McKnight Road, 14 Ramp Q over I-279, Ramp S, HOV Lane, 15 City of Pittsburgh, Bridge 16 Rehabilitation 38,000 17 (Base Project Allocation - $36,000) 18 (Design and Contingencies - $2,000) 19 (19) SR 8102, I-279 and McKnight Road, 20 Ramp S over LR 805, LR and LR02302, 21 Bridge Rehabilitation 297,000 22 (Base Project Allocation - $283,000) 23 (Design and Contingencies - $14,000) 24 (20) SR 6279 HOV Lane Bridge No.2030 over 25 four city streets, Federal to Anderson, 26 City of Pittsburgh, Bridge 27 Rehabilitation 63,000 28 (Base Project Allocation - $60,000) 29 (Design and Contingencies - $3,000) 30 (21) Tripoli Street over I-279, I-579, HOV 20080S1503B2474 - 18 -
1 Lane, City of Pittsburgh, Bridge 2 Rehabilitation 41,000 3 (Base Project Allocation - $39,000) 4 (Design and Contingencies - $2,000) 5 (22) SR 3031, Presley Road over Chartiers 6 Creek, Collier Township, 7 Bridge Rehabilitation 280,000 8 (Base Project Allocation - $200,000) 9 (Land Allocation - $40,000) 10 (Design and Contingencies - $40,000) 11 (23) SR 1001, Bridge Street over Pine 12 Creek, Etna Borough, Bridge 13 Rehabilitation 280,000 14 (Base Project Allocation - $200,000) 15 (Land Allocation - $40,000) 16 (Design and Contingencies - $40,000) 17 (24) SR 1028, Bakerstown Road over Bull 18 Creek, Fawn Township, Bridge 19 Replacement 473,000 20 (Base Project Allocation - $367,000) 21 (Land Allocation - $18,000) 22 (Design and Contingencies - $88,000) 23 (25) SR 3078, Burgettstown Road over North 24 Branch of Montour Run, Findlay 25 Township, Bridge Rehabilitation 958,000 26 (Base Project Allocation - $938,000) 27 (Design and Contingencies - $20,000) 28 (26) SR 4043, Big Sewickley Road over 29 Branch of Big Sewickley Creek, Franklin 30 Park Borough, Bridge Replacement 473,000 20080S1503B2474 - 19 -
1 (Base Project Allocation - $367,000) 2 (Land Allocation - $18,000) 3 (Design and Contingencies - $88,000) 4 (27) SR 0008, William Flynn Highway over 5 Gourdhead Run, Hampton Township, Bridge 6 Rehabilitation 958,000 7 (Base Project Allocation - $938,000) 8 (Design and Contingencies - $20,000) 9 (28) SR 1001, Freeport Road over Barge 10 Basin, Harmar Township, Bridge 11 Rehabilitation 280,000 12 (Base Project Allocation - $200,000) 13 (Land Allocation - $40,000) 14 (Design and Contingencies - $40,000) 15 (29) SR 1032, Burtner Road over Little 16 Bull Creek, Harrison Township, Bridge 17 Rehabilitation 150,000 18 (Base Project Allocation - $120,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $20,000) 21 (30) SR 1013, Saxonburg Boulevard over 22 Deer Creek, Indiana Township, Bridge 23 Replacement 452,000 24 (Base Project Allocation - $350,000) 25 (Land Allocation - $18,000) 26 (Design and Contingencies - $84,000) 27 (31) SR 1013 over Little Pine Creek, 28 Indiana Township, Bridge Replacement 452,000 29 (Base Project Allocation - $350,000) 30 (Land Allocation - $18,000) 20080S1503B2474 - 20 -
1 (Design and Contingencies - $84,000) 2 (32) SR 3021, Walton Road over Lobbs Run, 3 Jefferson Hills Borough, Bridge 4 Rehabilitation 958,000 5 (Base Project Allocation - $938,000) 6 (Design and Contingencies - $20,000) 7 (33) SR 4048, Grubbs Road over Pine Creek, 8 McCandless Township, Bridge 9 Rehabilitation 958,000 10 (Base Project Allocation - $938,000) 11 (Design and Contingencies - $20,000) 12 (34) SR 0978, Battle Ridge over Dolphin 13 Run, McDonald Borough, Bridge 14 Rehabilitation 958,000 15 (Base Project Allocation - $938,000) 16 (Design and Contingencies - $20,000) 17 (35) SR 3077, Brodhead Road over Boggs 18 Run, Moon Township, Bridge Replacement 473,000 19 (Base Project Allocation - $367,000) 20 (Land Allocation - $18,000) 21 (Design and Contingencies - $88,000) 22 (36) SR 3048, Noblestown Road over Branch 23 of Robinson Run, North Fayette 24 Township, Bridge Rehabilitation 601,000 25 (Base Project Allocation - $200,000) 26 (Land Allocation - $63,000) 27 (Design and Contingencies - $338,000) 28 (37) SR 3121 over abandoned Montour 29 Railroad, North Fayette Township, 30 Bridge Replacement 473,000 20080S1503B2474 - 21 -
1 (Base Project Allocation - $367,000) 2 (Land Allocation - $18,000) 3 (Design and Contingencies - $88,000) 4 (38) SR 2080, Plum Avenue over Plum Creek, 5 Oakmont Borough, Bridge Rehabilitation 280,000 6 (Base Project Allocation - $200,000) 7 (Land Allocation - $40,000) 8 (Design and Contingencies - $40,000) 9 (39) SR 1002 over Tributary of Allegheny 10 River, O'Hara Township, Bridge 11 Rehabilitation 233,000 12 (Base Project Allocation - $213,000) 13 (Design and Contingencies - $20,000) 14 (40) SR 2058, Hulton Road over Plum Creek, 15 Penn Hills Township, Bridge 16 Rehabilitation 150,000 17 (Base Project Allocation - $120,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $20,000) 20 (41) SR 0910, Salem Hollow Road over 21 Branch of North Fork of Pine Creek, 22 Pine Township, Bridge Rehabilitation 958,000 23 (Base Project Allocation - $938,000) 24 (Design and Contingencies - $20,000) 25 (42) SR 0051, At Intersection of SR 2032 26 Bridge No.730 over Lewis Run, Pleasant 27 Hills Borough, Bridge Replacement 452,000 28 (Base Project Allocation - $350,000) 29 (Land Allocation - $18,000) 30 (Design and Contingencies - $84,000) 20080S1503B2474 - 22 -
1 (43) SR 0051, Bridge No.729 over Lewis 2 Run, Pleasant Hills Borough, Bridge 3 Replacement 452,000 4 (Base Project Allocation - $350,000) 5 (Land Allocation - $18,000) 6 (Design and Contingencies - $84,000) 7 (44) I-279, Bridge No.1078 over I-279, HOV 8 Lane, Ross Township, Bridge 9 Rehabilitation 52,000 10 (Base Project Allocation - $49,000) 11 (Design and Contingencies - $3,000) 12 (45) Perrysville Avenue Ramp over LR 1021, 13 I-279, HOV Lanes, Ross Township, Bridge 14 Rehabilitation 153,000 15 (Base Project Allocation - $146,000) 16 (Design and Contingencies - $7,000) 17 (46) Union Avenue over I-279, Ross 18 Township, Bridge Rehabilitation 190,000 19 (Base Project Allocation - $181,000) 20 (Design and Contingencies - $9,000) 21 (47) SR 4009, Babcock Boulevard over 22 Girtys Run, Shaler Township, Bridge 23 Replacement 3,000,000 24 (Base Project Allocation - $3,000,000) 25 (48) SR 3028, Presto-Sygan Road over 26 Thomas Run Road, South Fayette 27 Township, Bridge Rehabilitation 150,000 28 (Base Project Allocation - $120,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $20,000) 20080S1503B2474 - 23 -
1 (49) SR 3002, Country Club over SR 0019, 2 Upper St. Clair Township, Bridge 3 Replacement 473,000 4 (Base Project Allocation - $367,000) 5 (Land Allocation - $18,000) 6 (Design and Contingencies - $88,000) 7 (50) SR 0837, Eighth Avenue over Baldwin 8 Road, West Homestead Borough, Bridge 9 Rehabilitation 350,000 10 (Base Project Allocation - $350,000) 11 (51) SR 2031, Lincoln Way over Long Run, 12 White Oak Borough, Bridge 13 Rehabilitation 958,000 14 (Base Project Allocation - $938,000) 15 (Design and Contingencies - $20,000) 16 (52) SR 4017, Little Pine Creek Road, over 17 West branch of Pine Creek, Shaler 18 Township, Bridge Rehabilitation 750,000 19 (Base Project Allocation - $750,000) 20 (53) SR 1028, Bakersville Culmerville 21 Road, over Railroad tracks, West Deer 22 Township, Bridge Replacement 2,300,000 23 (Base Project Allocation - $2,300,000) 24 (54) SR 1022, Oak Road, over Deer Creek, 25 West Deer Township, Bridge Replacement 150,000 26 (Base Project Allocation - $150,000) 27 (55) SR 1015, Little Deer Creek Road, over 28 B&LE Railroad Bridge over SR 1015, 29 Rural Ridge Tunnel, West Deer/Indiana 30 Township Border, Bridge Replacement 2,400,000 20080S1503B2474 - 24 -
1 (Base Project Allocation - $2,400,000) 2 (56) SR 4068, Pine Creek Road, over Pine 3 Creek, McCandless Township, Bridge 4 Replacement 1,500,000 5 (Base Project Allocation - $1,500,000) 6 (57) LIBERTY TUNNEL OVER SR 3069, <-- 7 NORTHBOUND, CITY OF PITTSBURGH, BRIDGE 8 RESTORATION 5,752,000 9 (BASE PROJECT ALLOCATION - $4,500,000) 10 (LAND ALLOCATION - $52,000) 11 (DESIGN AND CONTINGENCIES - $1,200,000) 12 (58) SR 0279 SOUTHBOUND RAMP, NORTHBOUND 13 APPROACH TO FORT DUQUESNE BRIDGE OVER 14 SR 8041 RAMP D, 1039, CITY OF 15 PITTSBURGH, BRIDGE REHABILITATION 982,000 16 (BASE PROJECT ALLOCATION - $462,000) 17 (LAND ALLOCATION - $20,000) 18 (DESIGN AND CONTINGENCIES - $500,000) 19 (59) H.O.V. STADIUM LOT WALL OVER STADIUM, 20 H.O.V. RAMP, CITY OF PITTSBURGH, BRIDGE 21 REHABILITATION 982,000 22 (BASE PROJECT ALLOCATION - $462,000) 23 (LAND ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $500,000) 25 (60) SR 3069 SH. LIBERTY TUNNEL 26 SOUTHBOUND, CITY OF PITTSBURGH, BRIDGE 27 RESTORATION 5,752,000 28 (BASE PROJECT ALLOCATION - $4,500,000) 29 (LAND ALLOCATION - $52,,000) 30 (DESIGN AND CONTINGENCIES - $1,200,000) 20080S1503B2474 - 25 -
1 (61) RAYMOND P. SHAFER HIGHWAY OVER 2 WARRENDALE BAYNE ROAD, SR 4052, RED 3 BELT, MARSHALL TOWNSHIP, BRIDGE 4 REHABILITATION 770,000 5 (BASE PROJECT ALLOCATION - $370,000) 6 (LAND ALLOCATION - $100,000) 7 (DESIGN AND CONTINGENCIES - $300,000) 8 (62) WARRENDALE BAYNE ROAD OVER LR 2271, 9 RAYMOND P. SHAFER HIGHWAY, LR 1021 10 NORTHBOUND, MARSHALL TOWNSHIP, BRIDGE 11 REHABILITATION 770,000 12 (BASE PROJECT ALLOCATION - $370,000) 13 (LAND ALLOCATION - $100,000) 14 (DESIGN AND CONTINGENCIES - $300,000) 15 (63) SR 0019, WEST END BRIDGE OVER OHIO 16 RIVER, CITY OF PITTSBURGH, BRIDGE 17 REHABILITATION 4,000,000 18 (BASE PROJECT ALLOCATION - $3,700,000) 19 (DESIGN AND CONTINGENCIES - $300,000) 20 (64) SR 2058, VERONA ROAD OVER SANDY 21 CREEK, PENN HILLS TOWNSHIP, BRIDGE 22 REPLACEMENT 600,000 23 (BASE PROJECT ALLOCATION - $500,000) 24 (LAND ALLOCATION - $50,000) 25 (DESIGN AND CONTINGENCIES - $50,000) 26 (65) SR 2080 OVER PLUM CREEK, PENN HILLS 27 TOWNSHIP, BRIDGE REHABILITATION 1,250,000 28 (BASE PROJECT ALLOCATION - $1,000,000) 29 (DESIGN AND CONTINGENCIES - $250,000) 30 (66) SR 0279 NORTHBOUND FORT DUQUESNE 20080S1503B2474 - 26 -
1 BRIDGE, SOUTHBOUND FORT DUQUESNE BRIDGE 2 OVER ALLEGHENY RIVER, BRIDGE 3 REHABILITATION 982,000 4 (BASE PROJECT ALLOCATION - $462,000) 5 (LAND ALLOCATION - $20,000) 6 (DESIGN AND CONTINGENCIES - $500,000) 7 (67) SR 0279, NORTHBOUND, NEAR PMC PARK 8 OVER I-279 SOUTHBOUND, CITY OF 9 PITTSBURGH, BRIDGE REHABILITATION 982,000 10 (BASE PROJECT ALLOCATION - $462,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $500,000) 13 (68) SR 0279, SOUTHBOUND, NEAR PMC PARK 14 OVER VARIOUS CITY STREETS, CITY OF 15 PITTSBURGH, BRIDGE REHABILITATION 982,000 16 (BASE PROJECT ALLOCATION - $462,000) 17 (LAND ALLOCATION - $20,000) 18 (DESIGN AND CONTINGENCIES - $500,000) 19 (69) SR 0279, SOUTHBOUND RAMP D OVER 20 APPROACH TO FORT DUQUESNE BRIDGE, CITY 21 OF PITTSBURGH, BRIDGE REHABILITATION 23,600,000 22 (BASE PROJECT ALLOCATION - $23,100,000) 23 (DESIGN AND CONTINGENCIES - $500,000) 24 (70) SR 3048 OVER ROBINSON RUN, NORTH 25 FAYETTE TOWNSHIP, BRIDGE 26 REHABILITATION 1,150,000 27 (BASE PROJECT ALLOCATION - $800,000) 28 (DESIGN AND CONTINGENCIES - $350,000) 29 (71) SR 3069 OVER MON RIVER, CITY OF 30 PITTSBURGH, BRIDGE REHABILITATION 3,412,000 20080S1503B2474 - 27 -
1 (BASE PROJECT ALLOCATION - $2,912,000) 2 (DESIGN AND CONTINGENCIES - $500,000) 3 (72) SR 3078, BURGETTSTOWN ROAD OVER NORTH 4 BRANCH MONTOUR RUN, FINDLAY TOWNSHIP, 5 BRIDGE REPLACEMENT 1,075,000 6 (BASE PROJECT ALLOCATION - $825,000) 7 (LAND ALLOCATION - $50,000) 8 (DESIGN AND CONTINGENCIES - $200,000) 9 (73) SR 0079 OVER SR 4052, RED BELT, 10 MARSHALL TOWNSHIP, BRIDGE PRESERVATION 2,200,000 11 (BASE PROJECT ALLOCATION - $2,000,000) 12 (LAND ALLOCATION - $50,000) 13 (DESIGN AND CONTINGENCIES - $150,000) 14 (74) SR 0079, LR 1021 NORTHBOUND OVER LR 15 2271, MARSHALL TOWNSHIP, BRIDGE 16 PRESERVATION 2,200,000 17 (BASE PROJECT ALLOCATION - $2,000,000) 18 (LAND ALLOCATION - $50,000) 19 (DESIGN AND CONTINGENCIES - $150,000) 20 (75) SR 0079, LR 1021 NORTHBOUND OVER LR 21 0246, MARSHALL TOWNSHIP, BRIDGE 22 PRESERVATION 1,600,000 23 (BASE PROJECT ALLOCATION - $1,200,000) 24 (LAND ALLOCATION - $50,000) 25 (DESIGN AND CONTINGENCIES - $350,000) 26 (76) SR 0028, BRIDGE RETROFIT, RAILROAD 27 RELOCATION OVER SR 0028, TROY HILL TO 28 MILVALE CITY, CITY OF PITTSBURGH, 29 MILLVALE BOROUGH, BRIDGE 30 REHABILITATION 3,953,000 20080S1503B2474 - 28 -
1 (BASE PROJECT ALLOCATION - $3,953,000) 2 (77) COLLIER ROAD OVER BRIDGE OVER 3 CHARTIERS CREEK, COLLIER TOWNSHIP, 4 BRIDGE REHABILITATION 925,000 5 (BASE PROJECT ALLOCATION - $750,000) 6 (LAND ALLOCATION - $75,000) 7 (DESIGN AND CONTINGENCIES - $100,000) 8 (78) KILBUCK STREET OVER KILBUCK RUN, 9 CULVERT, GLENFIELD BOROUGH, BRIDGE 10 REHABILITATION 560,000 11 (BASE PROJECT ALLOCATION - $400,000) 12 (LAND ALLOCATION - $80,000) 13 (DESIGN AND CONTINGENCIES - $80,000) 14 (79) WASHINGTON ROAD OVER PAINTERS RUN 15 ROAD, MT. LEBANON TOWNSHIP, BRIDGE 16 REPLACEMENT 925,000 17 (BASE PROJECT ALLOCATION - $750,000) 18 (LAND ALLOCATION - $75,000) 19 (DESIGN AND CONTINGENCIES - $100,000) 20 (80) CLINTON AVENUE, ROUTE 978 OVER NORTH 21 BRANCH CREEK, OAKDALE BOROUGH, BRIDGE 22 REHABILITATION 2,520,000 23 (BASE PROJECT ALLOCATION - $2,000,000) 24 (LAND ALLOCATION - $120,000) 25 (DESIGN AND CONTINGENCIES - $400,000) 26 (81) UNION AVENUE, ROUTE 978 OVER ROBINSON 27 RUN, OAKDALE TOWNSHIP, BRIDGE 28 REHABILITATION 1,070,000 29 (BASE PROJECT ALLOCATION - $850,000) 30 (LAND ALLOCATION - $100,000) 20080S1503B2474 - 29 -
1 (DESIGN AND CONTINGENCIES - $120,000) 2 (82) MILLERS RUN ROAD OVER MILLERS RUN, 3 SOUTH FAYETTE TOWNSHIP, BRIDGE 4 REPLACEMENT 1,320,000 5 (BASE PROJECT ALLOCATION - $1,000,000) 6 (LAND ALLOCATION - $120,000) 7 (DESIGN AND CONTINGENCIES - $200,000) 8 (83) STOLTZ ROAD OVER SLEEPY HOLLOW RUN, 9 SOUTH PARK TOWNSHIP, BRIDGE 10 REPLACEMENT 590,000 11 (BASE PROJECT ALLOCATION - $450,000) 12 (LAND ALLOCATION - $60,000) 13 (DESIGN AND CONTINGENCIES - $80,000) 14 (84) MCMILLAN ROAD OVER BRANCH OF 15 MCLAUGHLIN RUN, UPPER ST. CLAIR 16 TOWNSHIP, BRIDGE REHABILITATION 1,050,000 17 (BASE PROJECT ALLOCATION - $800,000) 18 (LAND ALLOCATION - $100,000) 19 (DESIGN AND CONTINGENCIES - $150,000) 20 Section 7. Armstrong County. 21 (a) Local Bridges 22 (1) Wayne Township, T-738 over South Fork 23 Pine Creek, Bridge Replacement 500,000 24 (Base Project Allocation - $500,000) 25 (2) Plumcreek Township, T-688 over South 26 Branch Plum Creek, Bridge 27 Rehabilitation 100,000 28 (Base Project Allocation - $100,000) 29 (3) Madison Township, T-468 over Red Bank 30 Creek, Bridge Rehabilitation 100,000 20080S1503B2474 - 30 -
1 (Base Project Allocation - $100,000) 2 (4) East Franklin Township, T-763 over 3 SR0422, Bridge Rehabilitation 100,000 4 (Base Project Allocation - $100,000) 5 (5) Cowanshannock Township, T-761 over 6 Cowanshannock Creek, Bridge 7 Rehabilitation 100,000 8 (Base Project Allocation - $100,000) 9 (b) State Bridges 10 (1) SR 2028 over Myers Run, Burrell 11 Township, Bridge Replacement 249,000 12 (Base Project Allocation - $69,000) 13 (Land Allocation - $40,000) 14 (Design and Contingencies - $140,000) 15 (2) SR 0085, Bridge No.3034 over Tributary 16 of Cowanshannock Creek, Cowanshannock 17 Township, Bridge Replacement 322,000 18 (Base Project Allocation - $142,000) 19 (Land Allocation - $40,000) 20 (Design and Contingencies - $140,000) 21 (3) SR 0085, Bridge No.3036 over Tributary 22 of Cowanshannock Creek, Cowanshannock 23 Township, Bridge Replacement 283,000 24 (Base Project Allocation - $103,000) 25 (Land Allocation - $40,000) 26 (Design and Contingencies - $140,000) 27 (4) SR 1028 over Tributary of Pine Creek, 28 Cowanshannock Township, Bridge 29 Replacement 208,000 30 (Base Project Allocation - $28,000) 20080S1503B2474 - 31 -
1 (Land Allocation - $40,000) 2 (Design and Contingencies - $140,000) 3 (5) SR 1037 over Schrecongost Run, 4 Cowanshannock Township, Bridge 5 Replacement 213,000 6 (Base Project Allocation - $33,000) 7 (Land Allocation - $40,000) 8 (Design and Contingencies - $140,000) 9 (6) SR 1039 over South Branch of South 10 Fork of Pine Creek, Cowanshannock 11 Township, Bridge Replacement 235,000 12 (Base Project Allocation - $150,000) 13 (Land Allocation - $15,000) 14 (Design and Contingencies - $70,000) 15 (7) SR 1039 over Tributary of South Branch 16 of South Fork of Pine Creek, 17 Cowanshannock Township, Bridge 18 Replacement 195,000 19 (Base Project Allocation - $150,000) 20 (Land Allocation - $15,000) 21 (Design and Contingencies - $30,000) 22 (8) SR 4006 over Glade Run, East Franklin 23 Township, Bridge Replacement 235,000 24 (Base Project Allocation - $150,000) 25 (Land Allocation - $15,000) 26 (Design and Contingencies - $70,000) 27 (9) SR 4008 over Glade Run, East Franklin 28 Township, Bridge Replacement 263,000 29 (Base Project Allocation - $83,000) 30 (Land Allocation - $40,000) 20080S1503B2474 - 32 -
1 (Design and Contingencies - $140,000) 2 (10) SR 2040 over Flat Run, Kiskiminetas 3 Township, Bridge Replacement 224,000 4 (Base Project Allocation - $44,000) 5 (Land Allocation - $40,000) 6 (Design and Contingencies - $140,000) 7 (11) SR 2052 over Tributary of Rattling 8 Run, Kiskiminetas Township, Bridge 9 Replacement 214,000 10 (Base Project Allocation - $34,000) 11 (Land Allocation - $40,000) 12 (Design and Contingencies - $140,000) 13 (12) SR 2015 over Thomas Run, Kittanning 14 Township, Bridge Replacement 242,000 15 (Base Project Allocation - $62,000) 16 (Land Allocation - $40,000) 17 (Design and Contingencies - $140,000) 18 (13) SR 1010 over Mahoning Creek, Mahoning 19 Township, Bridge Replacement 1,972,000 20 (Base Project Allocation - $1,792,000) 21 (Land Allocation - $40,000) 22 (Design and Contingencies - $140,000) 23 (14) SR 0066 over Tub Mill Run, Manor 24 Township, Bridge Replacement 260,000 25 (Base Project Allocation - $80,000) 26 (Land Allocation - $40,000) 27 (Design and Contingencies - $140,000) 28 (15) SR 2010 over Garretts Run, Manor 29 Township, Bridge Rehabilitation 195,000 30 (Base Project Allocation - $150,000) 20080S1503B2474 - 33 -
1 (Land Allocation - $15,000) 2 (Design and Contingencies - $30,000) 3 (16) SR 2025 over Garretts Run, Manor 4 Township, Bridge Replacement 258,000 5 (Base Project Allocation - $78,000) 6 (Land Allocation - $40,000) 7 (Design and Contingencies - $140,000) 8 (17) SR 3007 over Tributary of Glade Run, 9 North Buffalo Township, Bridge 10 Replacement 250,000 11 (Base Project Allocation - $70,000) 12 (Land Allocation - $40,000) 13 (Design and Contingencies - $140,000) 14 (18) SR 3011 over Tributary of Marrowbone 15 Run, North Buffalo Township, Bridge 16 Replacement 220,000 17 (Base Project Allocation - $40,000) 18 (Land Allocation - $40,000) 19 (Design and Contingencies - $140,000) 20 (19) SR 3017 over Glade Run, North Buffalo 21 Township, Bridge Replacement 486,000 22 (Base Project Allocation - $306,000) 23 (Land Allocation - $40,000) 24 (Design and Contingencies - $140,000) 25 (20) SR 0066 over Carnahan Run, Parks 26 Township, Bridge Replacement 448,000 27 (Base Project Allocation - $268,000) 28 (Land Allocation - $40,000) 29 (Design and Contingencies - $140,000) 30 (21) SR 2059 over Guffy Run, Parks 20080S1503B2474 - 34 -
1 Township, Bridge Replacement 300,000 2 (Base Project Allocation - $120,000) 3 (Land Allocation - $40,000) 4 (Design and Contingencies - $140,000) 5 (22) SR 2066 over Stitts Run, Parks 6 Township, Bridge Replacement 279,000 7 (Base Project Allocation - $99,000) 8 (Land Allocation - $40,000) 9 (Design and Contingencies - $140,000) 10 (23) SR 2066 over Tributary of Carnahan 11 Run, Parks Township, Bridge 12 Replacement 210,000 13 (Base Project Allocation - $30,000) 14 (Land Allocation - $40,000) 15 (Design and Contingencies - $140,000) 16 (24) SR 1030, Bridge No.3138 over Whisky 17 Hollow Run, Pine Township, Bridge 18 Replacement 206,000 19 (Base Project Allocation - $26,000) 20 (Land Allocation - $40,000) 21 (Design and Contingencies - $140,000) 22 (25) SR 1030, Bridge No.3139 over Whisky 23 Hollow Run, Pine Township, Bridge 24 Replacement 254,000 25 (Base Project Allocation - $74,000) 26 (Land Allocation - $40,000) 27 (Design and Contingencies - $140,000) 28 (26) SR 2003 over Tributary of Cessna Run, 29 Plumcreek Township, Bridge Replacement 257,000 30 (Base Project Allocation - $77,000) 20080S1503B2474 - 35 -
1 (Land Allocation - $40,000) 2 (Design and Contingencies - $140,000) 3 (27) SR 2005 over Cherry Run, Plumcreek 4 Township, Bridge Replacement 410,000 5 (Base Project Allocation - $230,000) 6 (Land Allocation - $40,000) 7 (Design and Contingencies - $140,000) 8 (28) SR 1036 over Cowanshannock Creek, 9 Rayburn Township, Bridge Replacement 740,000 10 (Base Project Allocation - $560,000) 11 (Land Allocation - $40,000) 12 (Design and Contingencies - $140,000) 13 (29) SR 1017 over Branch of Redbank Creek, 14 Redbank Township, Bridge Replacement 227,000 15 (Base Project Allocation - $47,000) 16 (Land Allocation - $40,000) 17 (Design and Contingencies - $140,000) 18 (30) SR 1039 over Tributary of Craigs Run, 19 Rural Valley Borough, Bridge 20 Replacement 234,000 21 (Base Project Allocation - $54,000) 22 (Land Allocation - $40,000) 23 (Design and Contingencies - $140,000) 24 (31) SR 2001 over Tributary of 25 Cowanshannock Creek, Rural Valley 26 Borough, Bridge Replacement 253,000 27 (Base Project Allocation - $73,000) 28 (Land Allocation - $40,000) 29 (Design and Contingencies - $140,000) 30 (32) SR 2026 over Fagley Run, South Bend 20080S1503B2474 - 36 -
1 Township, Bridge Replacement 245,000 2 (Base Project Allocation - $65,000) 3 (Land Allocation - $40,000) 4 (Design and Contingencies - $140,000) 5 (33) SR 0128, Bridge No.3289 over 6 Tributary of Pine Run, South Buffalo 7 Township, Bridge Replacement 252,000 8 (Base Project Allocation - $72,000) 9 (Land Allocation - $40,000) 10 (Design and Contingencies - $140,000) 11 (34) SR 0128, Bridge No.3290 over 12 Tributary of Pine Run, South Buffalo 13 Township, Bridge Replacement 288,000 14 (Base Project Allocation - $108,000) 15 (Land Allocation - $40,000) 16 (Design and Contingencies - $140,000) 17 (35) SR 0128, Bridge No.3291 over 18 Tributary of Pine Run, South Buffalo 19 Township, Bridge Replacement 206,000 20 (Base Project Allocation - $26,000) 21 (Land Allocation - $40,000) 22 (Design and Contingencies - $140,000) 23 (36) SR 0085, Bridge No.3026 over 24 Tributary of Cowanshannock Creek, 25 Valley Township, Bridge Replacement 209,000 26 (Base Project Allocation - $29,000) 27 (Land Allocation - $40,000) 28 (Design and Contingencies - $140,000) 29 (37) SR 4017 over Tributary of Huling Run, 30 Washington Township, Bridge 20080S1503B2474 - 37 -
1 Replacement 242,000 2 (Base Project Allocation - $62,000) 3 (Land Allocation - $40,000) 4 (Design and Contingencies - $140,000) 5 (38) SR 4017, Bridge No.3323 over 6 Tributary of Limestone Run, Washington 7 Township, Bridge Replacement 227,000 8 (Base Project Allocation - $47,000) 9 (Land Allocation - $40,000) 10 (Design and Contingencies - $140,000) 11 (39) SR 4017, Bridge No.3324 over 12 Tributary of Limestone Run, Washington 13 Township, Bridge Replacement 227,000 14 (Base Project Allocation - $47,000) 15 (Land Allocation - $40,000) 16 (Design and Contingencies - $140,000) 17 (40) SR 1018 over Branch of Pine Creek, 18 Wayne Township, Bridge Replacement 227,000 19 (Base Project Allocation - $47,000) 20 (Land Allocation - $40,000) 21 (Design and Contingencies - $140,000) 22 (41) SR 1020 over Branch of Pine Creek, 23 Wayne Township, Bridge Replacement 233,000 24 (Base Project Allocation - $53,000) 25 (Land Allocation - $40,000) 26 (Design and Contingencies - $140,000) 27 (42) SR 2003 OVER GASTOWN NORTH NO.2 OVER <-- 28 TRIBUTARY OF CESSNA RUN, PLUMCREEK 29 TOWNSHIP, BRIDGE REPLACEMENT 252,000 30 (BASE PROJECT ALLOCATION - $163,000) 20080S1503B2474 - 38 -
1 (LAND ALLOCATION - $16,000) 2 (DESIGN AND CONTINGENCIES - $73,000) 3 (43) SR 2012, SILVIS HOLLOW OVER RUPP RUN, 4 MANOR TOWNSHIP, BRIDGE REPLACEMENT 141,000 5 (BASE PROJECT ALLOCATION - $95,000) 6 (LAND ALLOCATION - $12,000) 7 (DESIGN AND CONTINGENCIES - $34,000) 8 (44) SR 0028, SLABTOWN BRIDGE NO.2 OVER 9 TRIBUTARY OF NORTH FORK OF PINE CREEK, 10 BOGGS TOWNSHIP, BRIDGE REPLACEMENT 221,000 11 (BASE PROJECT ALLOCATION - $150,000) 12 (LAND ALLOCATION - $18,000) 13 (DESIGN AND CONTINGENCIES - $53,000) 14 Section 8. Beaver County. 15 (a) Local Bridges (Reserved) 16 (b) State Bridges 17 (1) SR 0051, Constitution Boulevard over 18 Creek, City of Aliquippa, Bridge 19 Rehabilitation 601,000 20 (Base Project Allocation - $200,000) 21 (Land Allocation - $63,000) 22 (Design and Contingencies - $338,000) 23 (2) SR 0288, Zelienople over Camp Run, 24 Franklin Township, Bridge Replacement 256,000 25 (Base Project Allocation - $200,000) 26 (Land Allocation - $15,000) 27 (Design and Contingencies - $41,000) 28 (3) SR 3027, Georgetown Road over Mill 29 Creek, Greene Township, Bridge 30 Replacement 8,800,000 20080S1503B2474 - 39 -
1 (Base Project Allocation - $8,000,000) 2 (Design and Contingencies - $800,000) 3 (4) SR 3018, McCleary Road over Branch of 4 Mill Creek, Greene Township, Bridge 5 Rehabilitation 233,000 6 (Base Project Allocation - $213,000) 7 (Design and Contingencies - $20,000) 8 (5) SR 3032, Kendall Road over Little 9 Service Run, Hanover Township, Bridge 10 Replacement 1,000,000 11 (Base Project Allocation - $1,000,000) 12 (6) SR 0151, Bocktown Road over Raredon 13 Run, Independence Township, Bridge 14 Replacement 1,000,000 15 (Base Project Allocation - $1,000,000) 16 (7) SR 4034, Wolf Run Road over Wolf Run, 17 Industry Borough, Bridge 18 Rehabilitation 871,000 19 (Base Project Allocation - $770,000) 20 (Land Allocation - $3,000) 21 (Design and Contingencies - $98,000) 22 (8) SR 1015, Hartzel School over 23 Connoquenessing Creek, Marion Township, 24 Bridge Replacement 2,000,000 25 (Base Project Allocation - $2,000,000) 26 (9) SR 0068, Sunflower Road over Brush 27 Creek, New Sewickley Township, Bridge 28 Rehabilitation 1,090,000 29 (Base Project Allocation - $963,000) 30 (Land Allocation - $4,000) 20080S1503B2474 - 40 -
1 (Design and Contingencies - $123,000) 2 (10) SR 0168, Tuscarawas Road over Bealer 3 Run, Ohioville Borough, Bridge 4 Rehabilitation 233,000 5 (Base Project Allocation - $213,000) 6 (Design and Contingencies - $20,000) 7 (11) SR 4033, Wildwood Road over Brady 8 Run, Patterson Township, Bridge 9 Rehabilitation 233,000 10 (Base Project Allocation - $213,000) 11 (Design and Contingencies - $20,000) 12 (12) SR 3025, BOCKTOWN CORK ROAD BRIDGE <-- 13 OVER RAREDON RUN, INDEPENDENCE 14 TOWNSHIP, BRIDGE REHABILITATION 610,000 15 (BASE PROJECT ALLOCATION - $500,000) 16 (LAND ALLOCATION - $10,000) 17 (DESIGN AND CONTINGENCIES - $100,000) 18 (13) SR 3027, GEORGETOWN ROAD OVER MILL 19 CREEK, GREENE TOWNSHIP, BRIDGE 20 REPLACEMENT 1,350,000 21 (BASE PROJECT ALLOCATION - $1,000,000) 22 (LAND ALLOCATION - $50,000) 23 (DESIGN AND CONTINGENCIES - $300,000) 24 (14) SR 3052, ALIQUIPPA, AMBRIDGE BRIDGE 25 OVER OHIO RIVER, ALIQUIPPA CITY AND 26 AMBRIDGE BOROUGH, BRIDGE 27 REHABILITATION 4,009,000 28 (BASE PROJECT ALLOCATION - $3,744,000) 29 (LAND ALLOCATION - $113,000) 30 (DESIGN AND CONTINGENCIES - $152,000) 20080S1503B2474 - 41 -
1 (15) SR 0351 OVER BEAVER RIVER, KOPPEL 2 BOROUGH AND NORTH SEWICKLEY TOWNSHIP, 3 BRIDGE REPLACEMENT 36,340,000 4 (BASE PROJECT ALLOCATION - $30,000,000) 5 (LAND ALLOCATION - $2,000,000) 6 (DESIGN AND CONTINGENCIES - $4,340,000) 7 (16) SR 0051 OVER BEAVER RIVER, ROCHESTER 8 AND BRIDGEWATER BOROUGHS, BRIDGE 9 REHABILITATION 25,000,000 10 (BASE PROJECT ALLOCATION - $24,000,000) 11 (DESIGN AND CONTINGENCIES - $1,000,000) 12 (17) SR 0588, STIFFEN HILLS ROAD OVER 13 WALNUT BOTTOM RUN, CITY OF BEAVER 14 FALLS, BRIDGE REPLACEMENT 600,000 15 (BASE PROJECT ALLOCATION - $500,000) 16 (LAND ALLOCATION - $50,000) 17 (DESIGN AND CONTINGENCIES - $50,000) 18 (18) SR 0060 OVER OHIO RIVER, VANPORT 19 BOROUGH, BRIDGE REHABILITATION 1,370,000 20 (BASE PROJECT ALLOCATION - $1,170,000) 21 (DESIGN AND CONTINGENCIES - $200,000) 22 Section 9. Bedford County. 23 (a) Local Bridges (Reserved) 24 (b) State Bridges 25 (1) SR 1014 over Dunnings Creek, Bedford 26 Township, Bridge Rehabilitation 372,000 27 (Base Project Allocation - $372,000) 28 (2) PA 915 over Sandy Run, Broad Top 29 Township, Bridge Rehabilitation 279,000 30 (Base Project Allocation - $279,000) 20080S1503B2474 - 42 -
1 (3) SR 3009 over Tributary of Evitts 2 Creek, Cumberland Valley Township, 3 Bridge Rehabilitation 52,000 4 (Base Project Allocation - $36,000) 5 (Land Allocation - $1,000) 6 (Design and Contingencies - $15,000) 7 (4) SR 3017 over Cove Run, Harrison 8 Township, Bridge Rehabilitation 130,000 9 (Base Project Allocation - $130,000) 10 (5) SR 3001, Creek Road over Gladdens Run, 11 Londonderry Township, Bridge 12 Rehabilitation 461,000 13 (Base Project Allocation - $461,000) 14 (6) SR 3001, Creek Road over Wills Creek, 15 Londonderry Township, Bridge 16 Rehabilitation 569,000 17 (Base Project Allocation - $569,000) 18 (7) SR 3004 over Wills Creek, Londonderry 19 Township, Bridge Rehabilitation 422,000 20 (Base Project Allocation - $422,000) 21 (8) SR 0096 over Dunning Creek, Napier 22 Township, Bridge Replacement 642,000 23 (Base Project Allocation - $494,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $128,000) 26 (9) SR 0869 over Wallachs Branch, Pavia 27 Township, Bridge Rehabilitation 708,000 28 (Base Project Allocation - $708,000) 29 (10) SR 1007 over US 30, West Providence 30 Township, Bridge Restoration 5,450,000 20080S1503B2474 - 43 -
1 (Base Project Allocation - $5,300,000) 2 (Design and Contingencies - $150,000) 3 (11) T-493, RABBIT LANE OVER DUNNINGS <-- 4 CREEK, BEDFORD TOWNSHIP, BRIDGE 5 REPLACEMENT 96,000 6 (BASE PROJECT ALLOCATION - $96,000) 7 (12) T-493, RABBIT LANE, YOUNT, RABBIT 8 LANE OVER DUNNINGS CREEK, BEDFORD 9 TOWNSHIP, BRIDGE REHABILITATION 100,000 10 (BASE PROJECT ALLOCATION - $100,000) 11 Section 10. Berks County. 12 (a) Local Bridges 13 (1) Pike Township, T-614 over Pine Creek, 14 Bridge Replacement 141,000 15 (Base Project Allocation - $111,000) 16 (Land Allocation - $15,000) 17 (Design and Contingencies - $15,000) 18 (2) Robeson Township, T-344 over Allegheny 19 Creek, Bridge Replacement 91,000 20 (Base Project Allocation - $53,000) 21 (Land Allocation - $8,000) 22 (Design and Contingencies - $30,000) 23 (3) Birdsboro Borough, First Street over 24 Hay Creek, Bridge Rehabilitation 600,000 25 (Base Project Allocation - $600,000) 26 (4) Amity Township, T-463 over Unnamed 27 Waterway, Bridge Replacement 150,000 28 (Base Project Allocation - $150,000) 29 (5) SOUTH HEIDELBURG TOWNSHIP, T-382 OVER <-- 30 MANOR CREEK, BRIDGE REPLACEMENT 666,000 20080S1503B2474 - 44 -
1 (BASE PROJECT ALLOCATION - $666,000) 2 (6) ROBESON TOWNSHIP, MOUNTZ ROAD BRIDGE 3 OVER HAY CREEK, BRIDGE REHABILITATION 400,000 4 (BASE PROJECT ALLOCATION - $400,000) 5 (b) State Bridges 6 (1) SR 2077, River Bridge Road over 7 Schuylkill River, Amity Township, 8 Bridge Rehabilitation 4,500,000 9 (Base Project Allocation - $3,500,000) 10 (Land Allocation - $500,000) 11 (Design and Contingencies - $500,000) 12 (2) US 422 over Brentwood Drive, City of 13 Reading, Bridge Rehabilitation 1,900,000 14 (Base Project Allocation - $1,100,000) 15 (Land Allocation - $100,000) 16 (Design and Contingencies - $700,000) 17 (3) SR 3008, LR 06056 over Spring Creek, 18 North Heidelberg Township, Bridge 19 Rehabilitation 1,184,000 20 (Base Project Allocation - $1,184,000) 21 (4) PA 73 over Manatawny Creek, Oley 22 Township, Bridge Replacement 2,300,000 23 (Base Project Allocation - $1,200,000) 24 (Land Allocation - $100,000) 25 (Design and Contingencies - $1,000,000) 26 (5) I-176, over SR 0422, Cumru Township, 27 Bridge Rehabilitation 912,000 28 (Base Project Allocation - $912,000) 29 (6) SR 1021, over Tributary of Mill Creek, 30 Maxatawny Township, Bridge Replacement 732,000 20080S1503B2474 - 45 -
1 (Base Project Allocation - $420,000) 2 (Land Allocation - $26,000) 3 (Design and Contingencies - $286,000) 4 (7) SR 2047, over Monocacy Creek, Amity 5 Township, Bridge Rehabilitation 3,000,000 6 (Base Project Allocation - $3,000,000) 7 (8) PA 100, LR 6026 OVER WEST BRANCH <-- 8 PERKIOMEN CREEK, WASHINGTON TOWNSHIP, 9 BRIDGE REHABILITATION 772,000 10 (BASE PROJECT ALLOCATION - $540,000) 11 (DESIGN AND CONTINGENCIES - $232,000) 12 (9) PA 143, LR 6168 OVER TRIBUTARY OF 13 MAIDEN CREEK, GREENWICH TOWNSHIP, 14 BRIDGE REHABILITATION 84,000 15 (BASE PROJECT ALLOCATION - $59,000) 16 (DESIGN AND CONTINGENCIES - $25,000) 17 (10) SR 1008, LR 6125 OVER WINDSOR CREEK, 18 WINDSOR TOWNSHIP, BRIDGE 19 REHABILITATION 149,000 20 (BASE PROJECT ALLOCATION - $104,000) 21 (DESIGN AND CONTINGENCIES - $45,000) 22 (11) SR 1010, LR 6119 OVER SWOPE CREEK, 23 LONGSWAMP TOWNSHIP, BRIDGE 24 REHABILITATION 48,000 25 (BASE PROJECT ALLOCATION - $34,000) 26 (DESIGN AND CONTINGENCIES - $14,000) 27 (12) SR 1010, LR 6119, WEST OF MAPLE GROVE 28 OVER LITTLE LEHIGH CREEK, LONGSWAMP 29 TOWNSHIP, BRIDGE REHABILITATION, 30 REPLACEMENT 844,000 20080S1503B2474 - 46 -
1 (DESIGN AND CONTINGENCIES - $844,000) 2 (13) SR 1015, LR 6044 OVER TRIBUTARY OF 3 MILL CREEK, GREENWICH TOWNSHIP, BRIDGE 4 REHABILITATION 40,000 5 (BASE PROJECT ALLOCATION - $28,000) 6 (DESIGN AND CONTINGENCIES - $12,000) 7 (14) SR 1015, LR 6196 OVER STONEY RUN, 8 ALBANY TOWNSHIP, BRIDGE REHABILITATION 142,000 9 (BASE PROJECT ALLOCATION - $99,000) 10 (DESIGN AND CONTINGENCIES - $43,000) 11 (15) SR 1018, LR 6132 OVER TRIBUTARY OF 12 STONY RUN, ALBANY TOWNSHIP, BRIDGE 13 REHABILITATION 65,000 14 (BASE PROJECT ALLOCATION - $45,000) 15 (DESIGN AND CONTINGENCIES - $20,000) 16 (16) SR 1018, LR 6132SP OVER MAIDEN CREEK, 17 ALBANY TOWNSHIP, BRIDGE REHABILITATION 395,000 18 (BASE PROJECT ALLOCATION - $276,000) 19 (DESIGN AND CONTINGENCIES - $119,000) 20 (17) SR 1021, LR 6008 OVER BEAVER CREEK, 21 ROCKLAND TOWNSHIP, BRIDGE 22 REHABILITATION 100,000 23 (BASE PROJECT ALLOCATION - $70,000) 24 (DESIGN AND CONTINGENCIES - $30,000) 25 (18) SR 1021, LR 6203 OVER TRIBUTARY OF 26 MILL CREEK, MAXATAWNY TOWNSHIP, BRIDGE 27 REPLACEMENT 1,600,000 28 (BASE PROJECT ALLOCATION - $1,100,000) 29 (DESIGN AND CONTINGENCIES - $500,000) 30 (19) SR 1035, LR 6041 OVER TOAD CREEK, 20080S1503B2474 - 47 -
1 LONGSWAMP TOWNSHIP, BRIDGE 2 REHABILITATION 44,000 3 (BASE PROJECT ALLOCATION - $31,000) 4 (DESIGN AND CONTINGENCIES - $13,000) 5 (20) SR 0012, LR 6113 OVER TRIBUTARY OF 6 BERNHART CREEK, ALSACE TOWNSHIP, BRIDGE 7 REHABILITATION 93,000 8 (BASE PROJECT ALLOCATION - $66,000) 9 (DESIGN AND CONTINGENCIES - $28,000) 10 (21) SR 0183, LR 310 OVER TRIBUTARY OF 11 TULPEHOCKEN CREEK, BERN TOWNSHIP, 12 BRIDGE REHABILITATION 114,000 13 (BASE PROJECT ALLOCATION - $80,000) 14 (DESIGN AND CONTINGENCIES - $34,000) 15 (22) SR 4018, LR 6009 OVER JACKSON CREEK, 16 UPPER TULPEHOCKEN TOWNSHIP, BRIDGE 17 REHABILITATION 86,000 18 (BASE PROJECT ALLOCATION - $60,000) 19 (DESIGN AND CONTINGENCIES - $26,000) 20 (23) SR 4023, LR 6164, BERNE OVER PLUM 21 CREEK, CENTRE TOWNSHIP, BRIDGE 22 REHABILITATION 60,000 23 (BASE PROJECT ALLOCATION - $42,000) 24 (DESIGN AND CONTINGENCIES - $18,000) 25 (24) SR 4044, LR 6128 OVER WINDSOR CREEK, 26 WINDSOR TOWNSHIP, BRIDGE 27 REHABILITATION 70,000 28 (BASE PROJECT ALLOCATION - $49,000) 29 (DESIGN AND CONTINGENCIES - $21,000) 30 (25) SR 0562 OVER MANATAWNY CREEK, AMITY 20080S1503B2474 - 48 -
1 TOWNSHIP, BRIDGE REHABILITATION 1,052,000 2 (BASE PROJECT ALLOCATION - $736,000) 3 (DESIGN AND CONTINGENCIES - $316,000) 4 (26) SR 0562, LR 6110 OVER MONOCACY CREEK, 5 EXETER TOWNSHIP, BRIDGE REHABILITATION 370,000 6 (BASE PROJECT ALLOCATION - $259,000) 7 (DESIGN AND CONTINGENCIES - $111,000) 8 (27) SR 0061, LR 160 OVER LAUREL RUN, 9 MUHLENBERG TOWNSHIP, BRIDGE 10 REHABILITATION 344,000 11 (BASE PROJECT ALLOCATION - $241,000) 12 (DESIGN AND CONTINGENCIES - $103,000) 13 (28) SR 0645, LR 6004 OVER LITTLE SWATARA 14 CREEK, BETHEL TOWNSHIP, BRIDGE 15 REHABILITATION 1,033,000 16 (BASE PROJECT ALLOCATION - $723,000) 17 (DESIGN AND CONTINGENCIES - $310,000) 18 (29) SR 2083, LR 6099 OVER SIX PENNY 19 CREEK, UNION TOWNSHIP, BRIDGE 20 REHABILITATION 40,000 21 (BASE PROJECT ALLOCATION - $25,000) 22 (DESIGN AND CONTINGENCIES - $15,000) 23 (30) SR 3008, LR 6056 OVER SPRING CREEK, 24 NORTH HEIDELBERG TOWNSHIP, BRIDGE 25 REHABILITATION 1,200,000 26 (BASE PROJECT ALLOCATION - $1,100,000) 27 (DESIGN AND CONTINGENCIES - $100,000) 28 (31) SR 3039, LR 6050 OVER TRIBUTARY OF 29 TULPEHOCKEN CREEK, WOMELSDORF BOROUGH, 30 BRIDGE REHABILITATION 125,000 20080S1503B2474 - 49 -
1 (BASE PROJECT ALLOCATION - $75,000)
2 (DESIGN AND CONTINGENCIES - $50,000)
3 Section 11. Blair County.
4 (a) Local Bridges (Reserved) <--
5 (A) LOCAL BRIDGES <--
6 (1) CITY OF ALTOONA, 8TH AND 9TH STREETS,
7 PENN AND PARK BRIDGES OVER SPRING RUN,
8 BRIDGE REHABILITATION 40,000
9 (BASE PROJECT ALLOCATION - $40,000)
10 (2) CITY OF ALTOONA, T-473 OVER 8TH
11 STREET, BRIDGE REPLACEMENT 400,000
12 (BASE PROJECT ALLOCATION - $400,000)
13 (3) ANTIS TOWNSHIP, T-509, DANBACK ROAD
14 OVER TRIBUTARY OF LITTLE JUNIATA,
15 BRIDGE REPLACEMENT 423,000
16 (BASE PROJECT ALLOCATION - $260,000)
17 (LAND ALLOCATION - $11,000)
18 (DESIGN AND CONTINGENCIES - $152,000)
19 (4) HOLLIDAYSBURG BOROUGH, BEDFORD STREET
20 OVER TRIBUTARY OF BEAVERDAM BRANCH OF
21 JUNIATA RIVER, BRIDGE REPLACEMENT 580,000
22 (BASE PROJECT ALLOCATION - $400,000)
23 (LAND ALLOCATION - $60,000)
24 (DESIGN AND CONTINGENCIES - $120,000)
25 (5) VARIOUS, ENVIRONMENTAL AND
26 ENGINEERING, BLAIR COUNTYWIDE, BRIDGE
27 REHABILITATION 200,000
28 (DESIGN AND CONTINGENCIES - $200,000)
29 (b) State Bridges
30 (1) SR 0022, Bridge No.5519 over TR T-416,
20080S1503B2474 - 50 -
1 Allegheny Township, Bridge 2 Rehabilitation 433,000 3 (Base Project Allocation - $433,000) 4 (2) SR 0022, Bridge No.5521 over TR T-416, 5 Allegheny Township, Bridge 6 Rehabilitation 433,000 7 (Base Project Allocation - $433,000) 8 (3) SR 0022, Bridge No.5524 over TR T-406, 9 Allegheny Township, Bridge 10 Rehabilitation 433,000 11 (Base Project Allocation - $433,000) 12 (4) SR0022, Bridge No.5525 over SR 8004, 13 Ramp 13-C, TR 22 Eastbound, Allegheny 14 Township, Bridge Rehabilitation 433,000 15 (Base Project Allocation - $433,000) 16 (5) SR 0022, Bridge No.5528 over US 22, 17 Allegheny Township, Bridge 18 Rehabilitation 1,150,000 19 (Base Project Allocation - $1,050,000) 20 (Design and Contingencies - $100,000) 21 (6) SR 0022, Bridge No.5529 over SR 8004 22 Ramps, Allegheny Township, Bridge 23 Rehabilitation 433,000 24 (Base Project Allocation - $433,000) 25 (7) SR 0022, Bridge No.5531 over PA 764 26 Ramps, Allegheny Township, Bridge 27 Rehabilitation 1,150,000 28 (Base Project Allocation - $1,050,000) 29 (Design and Contingencies - $100,000) 30 (8) SR 0022, Bridge No.5522 over TR T-406, 20080S1503B2474 - 51 -
1 Allegheny Township, Bridge 2 Rehabilitation 433,000 3 (Base Project Allocation - $433,000) 4 (9) SR 1001 over Little Juniata River, 5 Antis Township, Bridge Replacement 880,000 6 (Base Project Allocation - $769,000) 7 (Land Allocation - $18,000) 8 (Design and Contingencies - $93,000) 9 (10) SR 1001 over Brush Run, City of 10 Altoona, Bridge Replacement 275,000 11 (Base Project Allocation - $275,000) 12 (11) SR 1009 over I-99 Ramps and US 220, 13 Logan Township, Bridge Rehabilitation 666,000 14 (Base Project Allocation - $650,000) 15 (Land Allocation - $1,000) 16 (Design and Contingencies - $15,000) 17 (12) SR 8007 over SEDA-COG Railroad, 18 Snyder Township, Bridge Rehabilitation 269,000 19 (Base Project Allocation - $269,000) 20 (13) SR 8007 over Bald Eagle Creek, Snyder 21 Township, Bridge Rehabilitation 269,000 22 (Base Project Allocation - $269,000) 23 (14) SR 0453 over Bald Eagle Creek, Tyrone 24 Borough, Bridge Rehabilitation 650,000 25 (Base Project Allocation - $650,000) 26 (15) SR 4008 OVER KITTANNING RUN, LOGAN <-- 27 TOWNSHIP, BRIDGE REPLACEMENT 800,000 28 (BASE PROJECT ALLOCATION - $800,000) 29 (16) SR 4016 OVER KETTLE CREEK, LOGAN 30 TOWNSHIP, BRIDGE REPLACEMENT 553,000 20080S1503B2474 - 52 -
1 (BASE PROJECT ALLOCATION - $553,000) 2 Section 12. Bradford County. 3 (a) Local Bridges (Reserved) 4 (b) State Bridges 5 (1) SR 3004 over Ladds Creek, Albany 6 Township, Bridge Replacement 130,000 7 (Base Project Allocation - $100,000) 8 (Design and Contingencies - $30,000) 9 (2) SR 0187 over Ellis Creek, Asylum 10 Township, Bridge Replacement 930,000 11 (Base Project Allocation - $700,000) 12 (Land Allocation - $30,000) 13 (Design and Contingencies - $200,000) 14 (3) SR 0199 over Chemung River overflow 15 channel, Athens Township, Bridge 16 Rehabilitation 70,000 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $50,000) 19 (4) SR 4022 over Tributary of Chemung 20 River, Athens Township, Bridge 21 Replacement 260,000 22 (Base Project Allocation - $180,000) 23 (Design and Contingencies - $80,000) 24 (5) SR 4002 over Browns Creek, Burlington 25 Township, Bridge Replacement 1,660,000 26 (Base Project Allocation - $1,300,000) 27 (Land Allocation - $30,000) 28 (Design and Contingencies - $330,000) 29 (6) SR 4033 over Tributary of Sugar Creek, 30 Columbia Township, Bridge Replacement 190,000 20080S1503B2474 - 53 -
1 (Base Project Allocation - $120,000) 2 (Land Allocation - $20,000) 3 (Design and Contingencies - $50,000) 4 (7) SR 4037 over Tributary of Sugar Creek, 5 Columbia Township, Bridge Replacement 150,000 6 (Base Project Allocation - $120,000) 7 (Design and Contingencies - $30,000) 8 (8) SR 3013 over Tributary of Towanda 9 Creek, Franklin Township, Bridge 10 Replacement 220,000 11 (Base Project Allocation - $120,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $80,000) 14 (9) SR 0414 over Tributary of Towanda 15 Creek, Leroy Township, Bridge 16 Replacement 1,540,000 17 (Base Project Allocation - $1,400,000) 18 (Land Allocation - $40,000) 19 (Design and Contingencies - $100,000) 20 (10) SR 1057 over Satterlee Creek, 21 Litchfield Township, Bridge 22 Rehabilitation 380,000 23 (Base Project Allocation - $350,000) 24 (Design and Contingencies - $30,000) 25 (11) SR 1067 over Satterlee Creek, 26 Litchfield Township, Bridge 27 Replacement 150,000 28 (Base Project Allocation - $120,000) 29 (Design and Contingencies - $30,000) 30 (12) SR 1017 over South Creek, Orwell 20080S1503B2474 - 54 -
1 Township, Bridge Replacement 190,000 2 (Base Project Allocation - $120,000) 3 (Land Allocation - $20,000) 4 (Design and Contingencies - $50,000) 5 (13) SR 1013 over Branch of Rockwell 6 Creek, Pike Township, Bridge 7 Replacement 120,000 8 (Base Project Allocation - $100,000) 9 (Land Allocation - $5,000) 10 (Design and Contingencies - $15,000) 11 (14) SR 1013 over Mill Creek, Pike 12 Township, Bridge Replacement 120,000 13 (Base Project Allocation - $100,000) 14 (Land Allocation - $5,000) 15 (Design and Contingencies - $15,000) 16 (15) SR 1021 over Rummerfield Creek, 17 Standing Stone Township, Bridge 18 Rehabilitation 170,000 19 (Base Project Allocation - $150,000) 20 (Design and Contingencies - $20,000) 21 (16) SR 0706 over Wolf Creek, Stevens 22 Township, Bridge Replacement 660,000 23 (Base Project Allocation - $510,000) 24 (Land Allocation - $30,000) 25 (Design and Contingencies - $120,000) 26 (17) SR 1007 over Wyalusing Creek, Stevens 27 Township, Bridge Rehabilitation 250,000 28 (Base Project Allocation - $200,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $40,000) 20080S1503B2474 - 55 -
1 (18) SR 0014 over Fall Brook, Troy 2 Borough, Bridge Replacement 770,000 3 (Base Project Allocation - $620,000) 4 (Land Allocation - $30,000) 5 (Design and Contingencies - $120,000) 6 (19) SR 1033 over Laning Creek, Wysox 7 Township, Bridge Rehabilitation 110,000 8 (Base Project Allocation - $90,000) 9 (Design and Contingencies - $20,000) 10 (20) SR 0467, PIKE TOWNSHIP, BRIDGE <-- 11 REPLACEMENT 585,000 12 (BASE PROJECT ALLOCATION - $545,000) 13 (DESIGN AND CONTINGENCIES - $40,000) 14 (21) SR 1041, TOWANDA RIVER BRIDGE, JAMES 15 STREET, CONRAIL OVER SUSQUEHANNA RIVER, 16 NORTH TOWANDA TOWNSHIP, BRIDGE 17 REHABILITATION 1,884,000 18 (BASE PROJECT ALLOCATION - $1,852,000) 19 (DESIGN AND CONTINGENCIES - $32,000) 20 Section 13. Bucks County. 21 (a) Local Bridges 22 (1) Bristol Township, Haines Road over 23 AMTRAK, Bridge Replacement 20,650,000 24 (Base Project Allocation - $18,000,000) 25 (Land Allocation - $400,000) 26 (Design and Contingencies - $2,250,000) 27 (2) Bristol Township, Wistar Road over 28 Queen Anne Creek, Bridge 29 Rehabilitation 88,000 30 (Base Project Allocation - $78,000) 20080S1503B2474 - 56 -
1 (Design and Contingencies - $10,000) 2 (3) Bristol Township, Green Lane over 3 Black Ditch Creek, Bridge 4 Rehabilitation 43,000 5 (Base Project Allocation - $38,000) 6 (Design and Contingencies - $5,000) 7 (4) Bristol Township, Mill Creek Road over 8 Black Ditch Creek, Bridge 9 Rehabilitation 5,502,000 10 (Base Project Allocation - $4,890,000) 11 (Design and Contingencies - $612,000) 12 (5) Middletown Township, Forsynthia 13 Crossing over Mill Creek, Bridge 14 Rehabilitation 83,000 15 (Base Project Allocation - $74,000) 16 (Design and Contingencies - $9,000) 17 (6) Warwick Township, School Road over 18 Tributary of Nehsaminy Creek, Bridge 19 Rehabilitation 31,000 20 (Base Project Allocation - $27,000) 21 (Design and Contingencies - $4,000) 22 (7) Warwick Township, Sycamore Drive over 23 Tributary of Little Neshaminy Creek, 24 Bridge Rehabilitation 10,000 25 (Base Project Allocation - $9,000) 26 (Design and Contingencies - $1,000) 27 (8) Warwick Township, Dark Hollow Road 28 over Tributary of Neshaminy Creek, 29 Bridge Rehabilitation 17,000 30 (Base Project Allocation - $15,000) 20080S1503B2474 - 57 -
1 (Design and Contingencies - $2,000) 2 (9) Ivyland Borough, Greeley Avenue over 3 Tributary of Neshaminy Creek, Bridge 4 Rehabilitation 104,000 5 (Base Project Allocation - $76,000) 6 (Design and Contingencies - $28,000) 7 (10) Bensalem Township, T-328 over 8 Neshaminy Creek, Bridge Rehabilitation 198,000 9 (Base Project Allocation - $168,000) 10 (Design and Contingencies - $30,000) 11 (11) Bensalem Township, Red Lion Road over 12 Poquessing Creek, Bridge 13 Rehabilitation 61,000 14 (Base Project Allocation - $51,000) 15 (Design and Contingencies - $10,000) 16 (12) Warwick Township, Fairway Drive over 17 Tributary of Fish Creek, Bridge 18 Rehabilitation 14,000 19 (Base Project Allocation - $13,000) 20 (Design and Contingencies - $1,000) 21 (13) Nockamixon Township, T-441 over 22 Beaver Creek, Bridge Rehabilitation 52,000 23 (Base Project Allocation - $44,000) 24 (Design and Contingencies - $8,000) 25 (14) Springfield Township, T-479 over 26 Cooks Creek, Bridge Rehabilitation 57,000 27 (Base Project Allocation - $48,000) 28 (Design and Contingencies - $9,000) 29 (15) Nockamixon Township, T-481 over 30 Gallows Run, Bridge Rehabilitation 44,000 20080S1503B2474 - 58 -
1 (Base Project Allocation - $37,000) 2 (Design and Contingencies - $7,000) 3 (16) Nockamixon Township, T-487 over 4 Gallows Run, Bridge Rehabilitation 98,000 5 (Base Project Allocation - $83,000) 6 (Design and Contingencies - $15,000) 7 (17) Milford Township, T-334 over Unami 8 Creek, Bridge Replacement 2,600,000 9 (Base Project Allocation - $2,300,000) 10 (Design and Contingencies - $300,000) 11 (18) Perkasie Borough, Walnut Street over 12 East Branch Perkiomen Creek, Bridge 13 Replacement 3,600,000 14 (Base Project Allocation - $3,000,000) 15 (Design and Contingencies - $600,000) 16 (19) Hilltown Township, T-417 over Morris 17 Run, Bridge Replacement 1,200,000 18 (Base Project Allocation - $1,000,000) 19 (Design and Contingencies - $200,000) 20 (20) New Hope Borough, Stockton Avenue 21 over Aquetong Creek, Bridge 22 Rehabilitation 112,000 23 (Base Project Allocation - $95,000) 24 (Design and Contingencies - $17,000) 25 (21) Hilltown Township, T-362 over Morris 26 Run, Bridge Rehabilitation 63,000 27 (Base Project Allocation - $53,000) 28 (Design and Contingencies - $10,000) 29 (22) Bedminster Township, T-417 over Deep 30 Run, Bridge Replacement 1,200,000 20080S1503B2474 - 59 -
1 (Base Project Allocation - $1,000,000) 2 (Design and Contingencies - $200,000) 3 (23) Bedminster Township, T-416 over Deep 4 Run, Bridge Rehabilitation 378,000 5 (Base Project Allocation - $371,000) 6 (Design and Contingencies - $7,000) 7 (24) Buckingham Township, T-376 over 8 Watson Creek, Bridge Rehabilitation 27,000 9 (Base Project Allocation - $22,000) 10 (Design and Contingencies - $5,000) 11 (25) Tinicum Township, T-440 over Tinicum 12 Creek, Bridge Rehabilitation 37,000 13 (Base Project Allocation - $31,000) 14 (Design and Contingencies - $6,000) 15 (26) Tinicum Township, T-439 over Rapp 16 Creek, Bridge Rehabilitation 93,000 17 (Base Project Allocation - $84,000) 18 (Design and Contingencies - $9,000) 19 (27) Buckingham and Warwick Townships, T- 20 381 over Neshaminy Creek, Bridge 21 Rehabilitation 393,000 22 (Base Project Allocation - $333,000) 23 (Design and Contingencies - $60,000) 24 (28) Plumstead Township, T-390 over North 25 Branch Neshaminy Creek, Bridge 26 Rehabilitation 253,000 27 (Base Project Allocation - $215,000) 28 (Design and Contingencies - $38,000) 29 (29) Bedminster Township, T-427 over 30 Tohickon Creek, Bridge Replacement 3,050,000 20080S1503B2474 - 60 -
1 (Base Project Allocation - $2,800,000) 2 (Design and Contingencies - $250,000) 3 (30) Tinicum Township, T-443 over 4 Pennsylvania Canal, Bridge 5 Rehabilitation 150,000 6 (Base Project Allocation - $125,000) 7 (Design and Contingencies - $25,000) 8 (31) Tinicum Township, T-445 over 9 Pennsylvania Canal, Bridge Replacement 2,640,000 10 (Base Project Allocation - $2,200,000) 11 (Design and Contingencies - $440,000) 12 (32) West Rockhill Township, T-433 over 13 Mill Creek, Bridge Rehabilitation 117,000 14 (Base Project Allocation - $99,000) 15 (Design and Contingencies - $18,000) 16 (33) Hilltown Township, T-421 over Morris 17 Run, Bridge Replacement 2,400,000 18 (Base Project Allocation - $2,150,000) 19 (Design and Contingencies - $250,000) 20 (34) Plumstead Township, T-146 over Cabin 21 Run, Bridge Rehabilitation 38,000 22 (Base Project Allocation - $32,000) 23 (Design and Contingencies - $6,000) 24 (35) Bedminster Township, T-376 over 25 Perkiomen Creek, Bridge Rehabilitation 32,000 26 (Base Project Allocation - $27,000) 27 (Design and Contingencies - $5,000) 28 (36) Bristol Township, Randall Avenue over 29 AMTRAK, Bridge Replacement 2,809,000 30 (Base Project Allocation - $2,174,000) 20080S1503B2474 - 61 -
1 (Land Allocation - $363,000) 2 (Design and Contingencies - $272,000) 3 (37) Tinicum Township, T-439 over Beaver 4 Creek, Bridge Replacement 1,900,000 5 (Base Project Allocation - $1,700,000) 6 (Design and Contingencies - $200,000) 7 (38) Nockamixon Township, T-443 over 8 Beaver Creek, Bridge Rehabilitation 82,000 9 (Base Project Allocation - $69,000) 10 (Design and Contingencies - $13,000) 11 (39) EAST ROCKHILL TOWNSHIP, ROCKHILL ROAD <-- 12 OVER THREE MILE RUN, BRIDGE 13 REPLACEMENT 750,000 14 (BASE PROJECT ALLOCATION - $500,000) 15 (DESIGN AND CONTINGENCIES - $250,000) 16 (40) EAST ROCKHILL TOWNSHIP, HILL ROAD 17 OVER THREE MILE RUN, BRIDGE 18 RESTORATION 750,000 19 (BASE PROJECT ALLOCATION - $500,000) 20 (DESIGN AND CONTINGENCIES - $250,000) 21 (41) EAST ROCKHILL TOWNSHIP, STONE EDGE 22 ROAD OVER THREE MILE RUN, BRIDGE 23 RESTORATION 500,000 24 (BASE PROJECT ALLOCATION - $500,000) 25 (42) UPPER SOUTHAMPTON TOWNSHIP, CASEY 26 ROAD OVER CASEY CIRCLE BOX CULVERT, 27 BRIDGE REPLACEMENT 150,000 28 (BASE PROJECT ALLOCATION - $150,000) 29 (43) UPPER SOUTHAMPTON TOWNSHIP, STEPHEN 30 WAY OVER GRAVEL HILL ROAD, BRIDGE 20080S1503B2474 - 62 -
1 REHABILITATION 25,000 2 (BASE PROJECT ALLOCATION - $25,000) 3 (b) State Bridges 4 (1) SR 2113, Pebble Hill over Pebble 5 Creek, Buckingham Township, Bridge 6 Rehabilitation 63,000 7 (Base Project Allocation - $11,000) 8 (Land Allocation - $1,000) 9 (Design and Contingencies - $51,000) 10 (2) SR 2103, Pineville Road over Pidcock 11 Creek, Buckingham Township, Bridge 12 Rehabilitation 63,000 13 (Base Project Allocation - $11,000) 14 (Land Allocation - $1,000) 15 (Design and Contingencies - $51,000) 16 (3) SR 2113, Pebble Hill Road over Branch 17 of Neshaminy Creek, Doylestown Borough, 18 Bridge Rehabilitation 63,000 19 (Base Project Allocation - $11,000) 20 (Land Allocation - $1,000) 21 (Design and Contingencies - $51,000) 22 (4) SR 2020, Tyburn Road over Ramp G, 23 Falls Township, Bridge Rehabilitation 5,384,000 24 (Base Project Allocation - $5,000,000) 25 (Design and Contingencies - $384,000) 26 (5) SR 2020, Tyburn Road over Warner 27 Company Road, Falls Township, Bridge 28 Rehabilitation 5,384,000 29 (Base Project Allocation - $5,000,000) 30 (Design and Contingencies - $384,000) 20080S1503B2474 - 63 -
1 (6) SR 2020, Tyburn Road over CONRAIL 2 Railroad to U.S. Steel, Falls Township, 3 Bridge Rehabilitation 5,384,000 4 (Base Project Allocation - $5,000,000) 5 (Design and Contingencies - $384,000) 6 (7) SR 2020, Tyburn Road over Newbold 7 Road, Falls Township, Bridge 8 Rehabilitation 5,384,000 9 (Base Project Allocation - $5,000,000) 10 (Design and Contingencies - $384,000) 11 (8) SR 2020, Tyburn Road over AMTRAK, 12 Falls Township, Bridge Rehabilitation 5,384,000 13 (Base Project Allocation - $5,000,000) 14 (Design and Contingencies - $384,000) 15 (9) SR 2020, Tyburn Road over Pennsylvania 16 Avenue, Falls Township, Bridge 17 Rehabilitation 5,384,000 18 (Base Project Allocation - $5,000,000) 19 (Design and Contingencies - $384,000) 20 (10) SR 2075, Dolington Road over I-95, 21 Lower Makefield Township, Bridge 22 Rehabilitation 63,000 23 (Base Project Allocation - $11,000) 24 (Land Allocation - $1,000) 25 (Design and Contingencies - $51,000) 26 (11) SR 2196, Quarry Road over I-95, Lower 27 Makefield Township, Bridge 28 Rehabilitation 63,000 29 (Base Project Allocation - $11,000) 30 (Land Allocation - $1,000) 20080S1503B2474 - 64 -
1 (Design and Contingencies - $51,000) 2 (12) SR 2195, Big Oak Road over I-95, 3 Middletown Township, Bridge 4 Rehabilitation 63,000 5 (Base Project Allocation - $11,000) 6 (Land Allocation - $1,000) 7 (Design and Contingencies - $51,000) 8 (13) SR 2037, Lincoln Highway over Branch 9 of Queen Anne Creek, Middletown 10 Township, Bridge Rehabilitation 1,389,000 11 (Base Project Allocation - $96,000) 12 (Land Allocation - $31,000) 13 (Design and Contingencies - $1,262,000) 14 (14) SR 4055, Kumry Road over Unami Creek, 15 Milford Township, Bridge 16 Rehabilitation 1,389,000 17 (Base Project Allocation - $96,000) 18 (Land Allocation - $31,000) 19 (Design and Contingencies - $1,262,000) 20 (15) Steinsburg Road over Branch of 21 Molasses Creek, Milford Township, 22 Bridge Replacement 1,500,000 23 (Base Project Allocation - $750,000) 24 (Land Allocation - $150,000) 25 (Design and Contingencies - $600,000) 26 (16) SR 0202, Butler Avenue over North 27 Branch of Neshaminy Creek, New Britain 28 Borough, Bridge Replacement 3,500,000 29 (Base Project Allocation - $921,000) 30 (Land Allocation - $65,000) 20080S1503B2474 - 65 -
1 (Design and Contingencies - $2,514,000) 2 (17) SR 2103, Stoney Hill Road over 3 Aquetong Creek, New Hope Borough, 4 Bridge Rehabilitation 63,000 5 (Base Project Allocation - $11,000) 6 (Land Allocation - $1,000) 7 (Design and Contingencies - $51,000) 8 (18) SR 1003, Carvers-Wismer Road over 9 Gaddes Run, Plumstead Township, Bridge 10 Rehabilitation 1,389,000 11 (Base Project Allocation - $96,000 12 (Land Allocation - $31,000) 13 (Design and Contingencies - $1,262,000) 14 (19) SR 0032, River Road over Hickory Run, 15 Plumstead Township, Bridge 16 Rehabilitation 1,389,000 17 (Base Project Allocation - $96,000) 18 (Land Allocation - $31,000) 19 (Design and Contingencies - $1,262,000) 20 (20) SR 0032, River Road over Tohickon 21 Creek, Plumstead Township, Bridge 22 Replacement 5,112,000 23 (Base Project Allocation - $4,222,000) 24 (Land Allocation - $450,000) 25 (Design and Contingencies - $440,000) 26 (21) SR 1011, Stump Road over Irish Run, 27 Plumstead Township, Bridge 28 Rehabilitation 63,000 29 (Base Project Allocation - $11,000) 30 (Land Allocation - $1,000) 20080S1503B2474 - 66 -
1 (Design and Contingencies - $51,000) 2 (22) SR 4013, Main Street over Norfolk 3 Southern Railway, Sellersville Borough, 4 Bridge Replacement 3,500,000 5 (Base Project Allocation - $1,093,000) 6 (Land Allocation - $250,000) 7 (Design and Contingencies - $2,157,000) 8 (23) SR 1003, Aquetong Road over Branch of 9 Aquetong Creek, Solebury Township, 10 Bridge Rehabilitation 1,389,000 11 (Base Project Allocation - $96,000) 12 (Land Allocation - $31,000) 13 (Design and Contingencies - $1,262,000) 14 (24) SR 0032, River Road over Cuttalossa 15 Creek, Solebury Township, Bridge 16 Replacement 2,000,000 17 (Base Project Allocation - $546,000) 18 (Land Allocation - $35,000) 19 (Design and Contingencies - $1,419,000) 20 (25) SR 0032, River Road over Tributary of 21 Delaware River, Solebury Township, 22 Bridge Rehabilitation 63,000 23 (Base Project Allocation - $11,000) 24 (Land Allocation - $1,000) 25 (Design and Contingencies - $51,000) 26 (26) SR 0032, River Road over Pennsylvania 27 Canal, Solebury Township, Bridge 28 Rehabilitation 3,073,000 29 (Base Project Allocation - $2,853,000) 30 (Land Allocation - $150,000) 20080S1503B2474 - 67 -
1 (Design and Contingencies - $70,000) 2 (27) SR 1004 over Paunnacussing Creek, 3 Solebury Township, Bridge 4 Rehabilitation 1,389,000 5 (Base Project Allocation - $96,000) 6 (Land Allocation - $31,000) 7 (Design and Contingencies - $1,262,000) 8 (28) SR 4101, Old Bethlehem Road over 9 Cooks Creek, Springfield Township, 10 Bridge Replacement 375,000 11 (Base Project Allocation - $250,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $115,000) 14 (29) SR 1012, Headquarters Road over 15 Tinicum Creek, Tinicum Township, Bridge 16 Rehabilitation 1,389,000 17 (Base Project Allocation - $96,000) 18 (Land Allocation - $31,000) 19 (Design and Contingencies - $1,262,000) 20 (30) SR 0032, River Road over Delaware 21 Canal, Tinicum Township, Bridge 22 Replacement 1,476,000 23 (Base Project Allocation - $691,000) 24 (Land Allocation - $35,000) 25 (Design and Contingencies - $750,000) 26 (31) SR 2101, Lurgan Road over Branch of 27 Pidcock Creek, Upper Makefield 28 Township, Bridge Rehabilitation 63,000 29 (Base Project Allocation - $11,000) 30 (Land Allocation - $1,000) 20080S1503B2474 - 68 -
1 (Design and Contingencies - $51,000) 2 (32) Street Road over Branch of Neshaminy 3 Creek, Warrington Township, Bridge 4 Replacement 940,000 5 (Base Project Allocation - $500,000) 6 (Land Allocation - $30,000) 7 (Design and Contingencies - $410,000) 8 (33) SR 2025, Bristol Road over Branch of 9 Little Neshaminy Creek, Warwick 10 Township, Bridge Replacement 2,000,000 11 (Base Project Allocation - $460,000) 12 (Land Allocation - $30,000) 13 (Design and Contingencies - $1,510,000) 14 (34) Allentown Road over Ridge Valley 15 Creek, West Rockhill Township, Bridge 16 Rehabilitation 2,000,000 17 (Base Project Allocation - $691,000) 18 (Land Allocation - $60,000) 19 (Design and Contingencies - $1,249,000) 20 (35) SR 2091, Mill Creek Road over Lahaska 21 Creek, Wrightstown Township, Bridge 22 Rehabilitation 63,000 23 (Base Project Allocation - $11,000) 24 (Land Allocation - $1,000) 25 (Design and Contingencies - $51,000) 26 (36) SR 2091, Mill Creek Road, Bridge 27 No.7340 over Branch of Mill Creek, 28 Wrightstown Township, Bridge 29 Rehabilitation 63,000 30 (Base Project Allocation - $11,000) 20080S1503B2474 - 69 -
1 (Land Allocation - $1,000) 2 (Design and Contingencies - $51,000) 3 (37) SR 2091, Mill Creek Road, Bridge 4 No.7342 over Branch of Mill Creek, 5 Wrightstown Township, Bridge 6 Rehabilitation 1,389,000 7 (Base Project Allocation - $96,000) 8 (Land Allocation - $31,000) 9 (Design and Contingencies - $1,262,000) 10 (38) SR 0032, River Road over Buck Creek, 11 Yardley Borough, Bridge Rehabilitation 63,000 12 (Base Project Allocation - $11,000) 13 (Land Allocation - $1,000) 14 (Design and Contingencies - $51,000) 15 (39) SR 2071, Taylorsville Road over Dyers 16 Creek, Yardley Borough, Bridge 17 Rehabilitation 63,000 18 (Base Project Allocation - $11,000) 19 (Land Allocation - $1,000) 20 (Design and Contingencies - $51,000) 21 (40) SR 2071, Yardley Road over Van Horn 22 Creek, Yardley Borough, Bridge 23 Rehabilitation 1,389,000 24 (Base Project Allocation - $96,000) 25 (Land Allocation - $31,000) 26 (Design and Contingencies - $1,262,000) 27 (41) SR 4047 over Tributary of Dry Branch 28 Creek, Richland Township, Bridge 29 Replacement 1,000,000 30 (Base Project Allocation - $1,000,000) 20080S1503B2474 - 70 -
1 (42) SR 0313 OVER LAKE NOCKAMIXON, EAST <-- 2 ROCKHILL TOWNSHIP, BRIDGE REPLACEMENT 2,500,000 3 (BASE PROJECT ALLOCATION - $2,500,000) 4 (43) COVERED BRIDGE ROAD OVER TOHICKON 5 CREEK, EAST ROCKHILL TOWNSHIP, BRIDGE 6 REHABILITATION 250,000 7 (BASE PROJECT ALLOCATION - $250,000) 8 Section 14. Butler County. 9 (a) Local Bridges 10 (1) Cranberry Township, Powell Road (T- 11 301) over Brush Creek, Bridge 12 Replacement 1,200,000 13 (Base Project Allocation - $1,200,000) 14 (b) State Bridges 15 (1) SR 0528 over Big Run, Brady Township, 16 Bridge Replacement 233,000 17 (Base Project Allocation - $53,000) 18 (Land Allocation - $40,000) 19 (Design and Contingencies - $140,000) 20 (2) SR 3004 over Connoquenessing Creek, 21 Butler Township, Bridge Replacement 401,000 22 (Base Project Allocation - $221,000) 23 (Land Allocation - $40,000) 24 (Design and Contingencies - $140,000) 25 (3) SR 3015 over Tributary of Breakneck 26 Creek, Callery Borough, Bridge 27 Replacement 230,000 28 (Base Project Allocation - $50,000) 29 (Land Allocation - $40,000) 30 (Design and Contingencies - $140,000) 20080S1503B2474 - 71 -
1 (4) SR 1027 over Tributary of South Fork 2 of Little Scrubgrass, Cherry Valley 3 Borough, Bridge Replacement 235,000 4 (Base Project Allocation - $150,000) 5 (Land Allocation - $15,000) 6 (Design and Contingencies - $70,000) 7 (5) SR 0008 over Branch of Muddy Creek, 8 Clay Township, Bridge Replacement 271,000 9 (Base Project Allocation - $91,000) 10 (Land Allocation - $40,000) 11 (Design and Contingencies - $140,000) 12 (6) SR 1010 over Tributary of Glade Run, 13 Clay Township, Bridge Replacement 216,000 14 (Base Project Allocation - $36,000) 15 (Land Allocation - $40,000) 16 (Design and Contingencies - $140,000) 17 (7) SR 2011, Bridge No.8034 over 18 Lardintown Run, Clinton Township, 19 Bridge Rehabilitation 195,000 20 (Base Project Allocation - $150,000) 21 (Land Allocation - $15,000) 22 (Design and Contingencies - $30,000) 23 (8) SR 2011, Bridge No.8038 over 24 Lardintown Run, Clinton Township, 25 Bridge Replacement 220,000 26 (Base Project Allocation - $150,000) 27 (Design and Contingencies - $70,000) 28 (9) SR 0038, Bridge No.7816 over Tributary 29 of Connoquenessing Creek, Concord 30 Township, Bridge Replacement 1,080,000 20080S1503B2474 - 72 -
1 (Base Project Allocation - $750,000) 2 (Land Allocation - $30,000) 3 (Design and Contingencies - $300,000) 4 (10) SR 0038, Bridge No.7817 over 5 Tributary of Connoquenessing Creek, 6 Concord Township, Bridge Replacement 211,000 7 (Base Project Allocation - $31,000) 8 (Land Allocation - $40,000) 9 (Design and Contingencies - $140,000) 10 (11) SR 0528 over Little Connoquenessing 11 Creek, Connoquenessing Township, Bridge 12 Replacement 434,000 13 (Base Project Allocation - $254,000) 14 (Land Allocation - $40,000) 15 (Design and Contingencies - $140,000) 16 (12) SR 0528 over Connoquenessing Creek, 17 Forward Township, Bridge Replacement 1,152,000 18 (Base Project Allocation - $972,000) 19 (Land Allocation - $40,000) 20 (Design and Contingencies - $140,000) 21 (13) SR 0008 over Branch of Curry Run, 22 Harrisville Borough, Bridge 23 Replacement 284,000 24 (Base Project Allocation - $104,000) 25 (Land Allocation - $40,000) 26 (Design and Contingencies - $140,000) 27 (14) SR 0079 Southbound over SR 8005, Ramp 28 E, Jackson Township, Bridge 29 Restoration 101,000 30 (Base Project Allocation - $101,000) 20080S1503B2474 - 73 -
1 (15) SR 0008 over Glade Run, Middlesex 2 Township, Bridge Replacement 417,000 3 (Base Project Allocation - $237,000) 4 (Land Allocation - $40,000) 5 (Design and Contingencies - $140,000) 6 (16) SR 3012 over Tributary of Glade Run, 7 Middlesex Township, Bridge Replacement 267,000 8 (Base Project Allocation - $87,000) 9 (Land Allocation - $40,000) 10 (Design and Contingencies - $140,000) 11 (17) SR 0079, Northbound over T-338, 12 Pfeifer Road, Muddycreek Township, 13 Bridge Restoration 101,000 14 (Base Project Allocation - $101,000) 15 (18) SR 0079, Southbound over T-338, 16 Pfeifer Road, Muddycreek Township, 17 Bridge Restoration 101,000 18 (Base Project Allocation - $101,000) 19 (19) SR 3044 over SR 0079, Muddycreek 20 Township, Bridge Replacement 1,427,000 21 (Base Project Allocation - $1,247,000) 22 (Land Allocation - $40,000) 23 (Design and Contingencies - $140,000) 24 (20) SR 1004 over Tributary of Silver 25 Creek, Parker Township, Bridge 26 Replacement 209,000 27 (Base Project Allocation - $29,000) 28 (Land Allocation - $40,000) 29 (Design and Contingencies - $140,000) 30 (21) SR 0268 over Tributary of South 20080S1503B2474 - 74 -
1 Branch of Bear Creek, Petrolia Borough, 2 Bridge Replacement 210,000 3 (Base Project Allocation - $30,000) 4 (Land Allocation - $40,000) 5 (Design and Contingencies - $140,000) 6 (22) SR 0173 over Tributary of Wolf Creek, 7 Slippery Rock Township, Bridge 8 Replacement 294,000 9 (Base Project Allocation - $114,000) 10 (Land Allocation - $40,000) 11 (Design and Contingencies - $140,000) 12 (23) SR 4010 over Tributary of Slippery 13 Rock Creek, Washington Township, Bridge 14 Replacement 235,000 15 (Base Project Allocation - $150,000) 16 (Land Allocation - $15,000) 17 (Design and Contingencies - $70,000) 18 (24) SR 4008 over Slippery Rock Creek, 19 West Liberty Borough, Bridge 20 Replacement 674,000 21 (Base Project Allocation - $494,000) 22 (Land Allocation - $40,000) 23 (Design and Contingencies - $140,000) 24 (25) SR 1019 over North Branch of Rough 25 Run, Winfield Township, Bridge 26 Replacement 281,000 27 (Base Project Allocation - $101,000) 28 (Land Allocation - $40,000) 29 (Design and Contingencies - $140,000) 30 (26) SR 4002, WEST SUNBURY NO.2 OVER <-- 20080S1503B2474 - 75 -
1 TRIBUTARY OF MUDDY CREEK, CLAY 2 TOWNSHIP, BRIDGE REPLACEMENT 256,000 3 (BASE PROJECT ALLOCATION - $163,000) 4 (LAND ALLOCATION - $20,000) 5 (DESIGN AND CONTINGENCIES - $73,000) 6 Section 15. Cambria County. 7 (a) Local Bridges (Reserved) 8 (b) State Bridges 9 (1) SR 0403 over Stonycreek River, City of 10 Johnstown, Bridge Rehabilitation 5,537,000 11 (Base Project Allocation - $5,537,000) 12 (2) SR 0053 over Bens Creek, Portage 13 Township, Bridge Rehabilitation 40,000 14 (Base Project Allocation - $27,000) 15 (Land Allocation - $1,000) 16 (Design and Contingencies - $12,000) 17 (3) SR 2012 over Bens Creek, Portage 18 Township, Bridge Rehabilitation 140,000 19 (Base Project Allocation - $140,000) 20 (4) SR 3104 over US 219, Richland 21 Township, Bridge Rehabilitation 1,475,000 22 (Base Project Allocation - $1,300,000) 23 (Design and Contingencies - $175,000) 24 (5) SR 0053 over Laurel Run, Summerhill 25 Borough, Bridge Rehabilitation 80,000 26 (Base Project Allocation - $55,000) 27 (Land Allocation - $1,000) 28 (Design and Contingencies - $24,000) 29 (6) SR 0053 over Abandoned Mine Trace, 30 Washington Township, Bridge 20080S1503B2474 - 76 -
1 Replacement 100,000 2 (Base Project Allocation - $70,000) 3 (Land Allocation - $5,000) 4 (Design and Contingencies - $25,000) 5 (7) PA 403, NAPOLEON STREET OVER <-- 6 STONYCREEK RIVER, CITY OF JOHNSTOWN, 7 BRIDGE REHABILITATION 1,450,000 8 (BASE PROJECT ALLOCATION - $1,450,000) 9 (8) PA 53 OVER LAUREL RUN, SUMMERHILL 10 BOROUGH, BRIDGE REHABILITATION 400,000 11 (BASE PROJECT ALLOCATION - $400,000) 12 (9) SR 1011 OVER TRIBUTARY OF BEAVER DAM 13 RUN, ALLEGHENY TOWNSHIP, BRIDGE 14 REPLACEMENT 281,000 15 (BASE PROJECT ALLOCATION - $281,000) 16 (10) SR 1021 OVER TRIBUTARY OF LAKE 17 GLENDALE, WHITE TOWNSHIP, BRIDGE 18 REPLACEMENT 65,000 19 (BASE PROJECT ALLOCATION - $65,000) 20 (11) SR 1023 OVER TRIBUTARY OF LAKE 21 GLENDALE, WHITE TOWNSHIP, BRIDGE 22 REPLACEMENT 51,000 23 (BASE PROJECT ALLOCATION - $51,000) 24 (12) US 219 OVER PA 869 AND SR 3048, ADAMS 25 TOWNSHIP, BRIDGE REHABILITATION 231,000 26 (BASE PROJECT ALLOCATION - $231,000) 27 (13) US 219 OVER SOUTH FORK CONE RIVER AND 28 RAILROAD, CROYLE TOWNSHIP, BRIDGE 29 REHABILITATION 240,000 30 (BASE PROJECT ALLOCATION - $240,000) 20080S1503B2474 - 77 -
1 (14) US 219 OVER SR 2006, CROYLE TOWNSHIP, 2 BRIDGE REHABILITATION 68,000 3 (BASE PROJECT ALLOCATION - $68,000) 4 (15) US 219 OVER PA 53, SR 3024 AND 5 NORFOLK SOUTHERN RAILROAD, CROYLE 6 TOWNSHIP, BRIDGE REHABILITATION 263,000 7 (BASE PROJECT ALLOCATION - $263,000) 8 (16) US 219 OVER LITTLE CONEMAUGH RIVER, 9 EHRENFELD BOROUGH, BRIDGE 10 REHABILITATION 184,000 11 (BASE PROJECT ALLOCATION - $184,000) 12 (17) US 219 OVER PORTER RUN, NORTHERN 13 CAMBRIA BOROUGH, BRIDGE REPLACEMENT 1,410,000 14 (BASE PROJECT ALLOCATION - $1,000,000) 15 (LAND ALLOCATION - $60,000) 16 (DESIGN AND CONTINGENCIES - $350,000) 17 (18) US 219 OVER SR 3043, JACKSON STREET, 18 SUMMERHILL BOROUGH, BRIDGE 19 REHABILITATION 109,000 20 (BASE PROJECT ALLOCATION - $109,000) 21 (19) SR 1011, 3.5 MILES NORTH OF SYBERTON 22 OVER TRIBUTARY OF BEAVER DAM RUN, 23 ALLEGHENY TOWNSHIP, BRIDGE REPLACEMENT 356,000 24 (BASE PROJECT ALLOCATION - $281,000) 25 (DESIGN AND CONTINGENCIES - $75,000) 26 Section 16. Cameron County. 27 (a) Local Bridges (Reserved) 28 (b) State Bridges 29 (1) SR 4003 over Tributary of Clear Creek, 30 Shippen Township, Bridge Replacement 215,000 20080S1503B2474 - 78 -
1 (Base Project Allocation - $140,000) 2 (Design and Contingencies - $75,000) 3 (2) SR 0046 OVER EDDIES RUN, SHIPPEN <-- 4 TOWNSHIP, BRIDGE REPLACEMENT 80,000 5 (BASE PROJECT ALLOCATION - $40,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $20,000) 8 (3) SR 0046 OVER NORTH CREEK, SHIPPEN 9 TOWNSHIP, BRIDGE REPLACEMENT 68,000 10 (BASE PROJECT ALLOCATION - $32,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $16,000) 13 (4) SR 0120 OVER MASON RUN, GIBSON 14 TOWNSHIP, BRIDGE REPLACEMENT 85,000 15 (BASE PROJECT ALLOCATION - $43,000) 16 (LAND ALLOCATION - $20,000) 17 (DESIGN AND CONTINGENCIES - $22,000) 18 (5) SR 0120, BRIDGE NO.8829 OVER BIG RUN, 19 SHIPPEN TOWNSHIP, BRIDGE REPLACEMENT 100,000 20 (BASE PROJECT ALLOCATION - $53,000) 21 (LAND ALLOCATION - $20,000) 22 (DESIGN AND CONTINGENCIES - $27,000) 23 (6) SR 0120, BRIDGE NO.8830 OVER BIG RUN, 24 SHIPPEN TOWNSHIP, BRIDGE REPLACEMENT 89,000 25 (BASE PROJECT ALLOCATION - $46,000) 26 (LAND ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $23,000) 28 (7) SR 0120, BRIDGE NO.8831 OVER BIG RUN, 29 SHIPPEN TOWNSHIP, BRIDGE REPLACEMENT 127,000 30 (BASE PROJECT ALLOCATION - $71,000) 20080S1503B2474 - 79 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $36,000) 3 (8) SR 0155 OVER COWLEY RUN, PORTAGE 4 TOWNSHIP, BRIDGE REHABILITATION 335,000 5 (BASE PROJECT ALLOCATION - $210,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $105,000) 8 (9) SR 0155 OVER PORTAGE CREEK, PORTAGE 9 TOWNSHIP, BRIDGE REPLACEMENT 459,000 10 (BASE PROJECT ALLOCATION - $293,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $146,000) 13 (10) SR 0155 OVER FOUR MILE RUN, SHIPPEN 14 TOWNSHIP, BRIDGE REPLACEMENT 146,000 15 (BASE PROJECT ALLOCATION - $84,000) 16 (LAND ALLOCATION - $20,000) 17 (DESIGN AND CONTINGENCIES - $42,000) 18 (11) SR 0155 OVER SALT RUN, SHIPPEN 19 TOWNSHIP, BRIDGE REPLACEMENT 274,000 20 (BASE PROJECT ALLOCATION - $169,000) 21 (LAND ALLOCATION - $20,000) 22 (DESIGN AND CONTINGENCIES - $85,000) 23 (12) SR 0872 OVER WHITE OAK RUN, GROVE 24 TOWNSHIP, BRIDGE REPLACEMENT 40,000 25 (BASE PROJECT ALLOCATION - $13,000) 26 (LAND ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $7,000) 28 (13) SR 3001 OVER WEST CREEK, SHIPPEN 29 TOWNSHIP, BRIDGE REPLACEMENT 242,000 30 (BASE PROJECT ALLOCATION - $148,000) 20080S1503B2474 - 80 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $74,000) 3 (14) SR 4003 OVER TRIBUTARY OF CLEAR 4 CREEK, SHIPPEN TOWNSHIP, BRIDGE 5 REPLACEMENT 339,000 6 (BASE PROJECT ALLOCATION - $158,000) 7 (LAND ALLOCATION - $100,000) 8 (DESIGN AND CONTINGENCIES - $81,000) 9 (15) SR 4004 OVER CLEAR CREEK, SHIPPEN 10 TOWNSHIP, BRIDGE REHABILITATION 460,000 11 (BASE PROJECT ALLOCATION - $360,000) 12 (LAND ALLOCATION - $100,000) 13 (16) SR 4004 OVER FISHING CREEK, SHIPPEN 14 TOWNSHIP, BRIDGE REPLACEMENT 131,000 15 (BASE PROJECT ALLOCATION - $74,000) 16 (LAND ALLOCATION - $20,000) 17 (DESIGN AND CONTINGENCIES - $37,000) 18 (17) SR 4004 OVER LITTLE ELK FORK, SHIPPEN 19 TOWNSHIP, BRIDGE REPLACEMENT 76,000 20 (BASE PROJECT ALLOCATION - $37,000) 21 (LAND ALLOCATION - $20,000) 22 (DESIGN AND CONTINGENCIES - $19,000) 23 (18) SR 4004, BRIDGE NO.8944 OVER 24 DRIFTWOOD BRANCH, SHIPPEN TOWNSHIP, 25 BRIDGE REHABILITATION 696,000 26 (BASE PROJECT ALLOCATION - $596,000) 27 (LAND ALLOCATION - $100,000) 28 (19) SR 4004, BRIDGE NO.8949 OVER 29 DRIFTWOOD BRANCH, SHIPPEN TOWNSHIP, 30 BRIDGE REHABILITATION 671,000 20080S1503B2474 - 81 -
1 (BASE PROJECT ALLOCATION - $571,000) 2 (LAND ALLOCATION - $100,000) 3 (20) SR 2001 OVER SINNEMAHONING CREEK, 4 GROVE TOWNSHIP, BRIDGE REHABILITATION 851,000 5 (BASE PROJECT ALLOCATION - $751,000) 6 (LAND ALLOCATION - $100,000) 7 Section 17. Carbon County. 8 (a) Local Bridges 9 (1) Mahoning Township, Fredericks Grove 10 over Mahoning Creek, Bridge 11 Replacement 1,320,000 12 (Base Project Allocation - $800,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $500,000) 15 (2) Lehighton Borough, East Penn Street 16 over Mahoning Creek, Bridge 17 Rehabilitation 300,000 18 (Base Project Allocation - $200,000) 19 (Design and Contingencies - $100,000) 20 (3) Packer Township, Grist Mill Road over 21 Quakake Creek, Bridge Rehabilitation 300,000 22 (Base Project Allocation - $200,000) 23 (Design and Contingencies - $100,000) 24 (4) East Penn Township, Riverview Road 25 over Lizard Creek, Bridge 26 Rehabilitation 300,000 27 (Base Project Allocation - $200,000) 28 (Design and Contingencies - $100,000) 29 (5) East Penn Township, Blue Mountain Road 30 over Lizard Creek, Bridge 20080S1503B2474 - 82 -
1 Rehabilitation 300,000 2 (Base Project Allocation - $200,000) 3 (Design and Contingencies - $100,000) 4 (6) East Penn Township, Germans Road over 5 Lizard Creek, Bridge Rehabilitation 300,000 6 (Base Project Allocation - $200,000) 7 (Design and Contingencies - $100,000) 8 (7) East Penn Township, Lauchnor Road over 9 Lizard Creek, Bridge Rehabilitation 300,000 10 (Base Project Allocation - $200,000) 11 (Design and Contingencies - $100,000) 12 (8) East Penn Township, Stone Mountain 13 Road over Lizard Creek, Bridge 14 Rehabilitation 300,000 15 (Base Project Allocation - $200,000) 16 (Design and Contingencies - $100,000) 17 (9) Lehigh Township, T-477 over Leslie 18 Run, Bridge Replacement 520,000 19 (Base Project Allocation - $300,000) 20 (Land Allocation - $20,000) 21 (Design and Contingencies - $200,000) 22 (10) Lower Towamensing Township, Covered 23 Bridge Road over Buckwa Creek, Bridge 24 Rehabilitation 500,000 25 (Base Project Allocation - $300,000) 26 (Design and Contingencies - $200,000) 27 (11) Kidder Township, SR 1005 over Lehigh 28 River, Bridge Replacement 5,550,000 29 (Base Project Allocation - $3,500,000) 30 (Land Allocation - $50,000) 20080S1503B2474 - 83 -
1 (Design and Contingencies - $2,000,000) 2 (12) Towamensing Township, Pohopoco Road 3 over Pine Run/Beltzville Lake, Bridge 4 Rehabilitation 2,100,000 5 (Base Project Allocation - $1,300,000) 6 (Design and Contingencies - $800,000) 7 (13) Penn Forest Township, Smith Road over 8 Stoney Creek, Bridge Replacement 520,000 9 (Base Project Allocation - $300,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $200,000) 12 (14) (RESERVED) <-- 13 (15) (RESERVED) 14 (b) State Bridges 15 (1) SR 4014, Rockport Road over Indian 16 Run, Lehigh Township, Bridge 17 Replacement 1,625,000 18 (Base Project Allocation - $1,100,000) 19 (Land Allocation - $75,000) 20 (Design and Contingencies - $450,000) 21 (2) PA 534, LR 13018 OVER BRANCH OF <-- 22 CARPSROCUS CREEK, PENN FOREST TOWNSHIP, 23 BRIDGE REHABILITATION 110,000 24 (BASE PROJECT ALLOCATION - $77,000) 25 (DESIGN AND CONTINGENCIES - $33,000) 26 (3) SR 1003, LR 13039 OVER TRIBUTARY OF 27 TUNKHANNOCK CREEK, KIDDER TOWNSHIP, 28 BRIDGE REHABILITATION 88,000 29 (BASE PROJECT ALLOCATION - $61,000) 30 (DESIGN AND CONTINGENCIES - $27,000) 20080S1503B2474 - 84 -
1 (4) SR 2004, LR 13014 OVER MILL CREEK, 2 LOWER TOWAMENSING TOWNSHIP, BRIDGE 3 REHABILITATION 185,000 4 (BASE PROJECT ALLOCATION - $130,000) 5 (DESIGN AND CONTINGENCIES - $55,000) 6 (5) SR 3001, LR 13006 OVER MAHONING CREEK, 7 MAHONING TOWNSHIP, BRIDGE 8 REHABILITATION 393,000 9 (BASE PROJECT ALLOCATION - $275,000) 10 (DESIGN AND CONTINGENCIES - $118,000) 11 (6) SR 3006, LR 13009 OVER MERTZ RUN, 12 MAHONING TOWNSHIP, BRIDGE 13 REHABILITATION 70,000 14 (BASE PROJECT ALLOCATION - $49,000) 15 (DESIGN AND CONTINGENCIES - $21,000) 16 (7) SR 3012, LR 13033 OVER MAUCH CHUNK 17 CREEK, JIM THORPE BOROUGH, BRIDGE 18 REHABILITATION 395,000 19 (BASE PROJECT ALLOCATION - $276,000) 20 (DESIGN AND CONTINGENCIES - $119,000) 21 (8) SR 4010 OVER HAZEL CREEK, WEATHERLY 22 BOROUGH, BRIDGE REHABILITATION 696,000 23 (BASE PROJECT ALLOCATION - $487,000) 24 (DESIGN AND CONTINGENCIES - $209,000) 25 (9) SR 4010, LR 13025 OVER QUAKAKE CREEK, 26 PACKER TOWNSHIP, BRIDGE REHABILITATION 179,000 27 (BASE PROJECT ALLOCATION - $125,000) 28 (DESIGN AND CONTINGENCIES - $54,000) 29 (10) SR 4014, LR 13022, BRIDGE NO.9111 30 OVER INDIAN RUN, LEHIGH TOWNSHIP, 20080S1503B2474 - 85 -
1 BRIDGE REPLACEMENT 725,000
2 (BASE PROJECT ALLOCATION - $525,000)
3 (DESIGN AND CONTINGENCIES - $200,000)
4 (11) SR 0534, LR 13018 OVER SWAMP RUN,
5 KIDDER TOWNSHIP, BRIDGE REHABILITATION 159,000
6 (BASE PROJECT ALLOCATION - $111,000)
7 (DESIGN AND CONTINGENCIES - $48,000)
8 (12) US 209, LR 163 OVER BEAVER RUN,
9 MAHONING TOWNSHIP, BRIDGE
10 REHABILITATION 185,000
11 (BASE PROJECT ALLOCATION - $129,000)
12 (DESIGN AND CONTINGENCIES - $56,000)
13 Section 18. Centre County.
14 (a) Local Bridges (Reserved) <--
15 (A) LOCAL BRIDGES <--
16 (1) COLLEGE TOWNSHIP, T-365 OVER SPRING
17 CREEK, TROUT ROAD, BRIDGE REPLACEMENT 300,000
18 (BASE PROJECT ALLOCATION - $200,000)
19 (LAND ALLOCATION - $50,000)
20 (DESIGN AND CONTINGENCIES - $50,000)
21 (b) State Bridges
22 (1) SR 3001 over Branch of Spring Creek,
23 Benner Township, Bridge Replacement 34,000
24 (Base Project Allocation - $34,000)
25 (2) SR 1002 over Branch of Little Marsh
26 Creek, Boggs Township, Bridge
27 Replacement 300,000
28 (Base Project Allocation - $200,000)
29 (Land Allocation - $50,000)
30 (Design and Contingencies - $50,000)
20080S1503B2474 - 86 -
1 (3) SR 1002, Bridge No.9580 over Little 2 Marsh Creek, Curtin Township, Bridge 3 Replacement 2,200,000 4 (Base Project Allocation - $1,500,000) 5 (Land Allocation - $100,000) 6 (Design and Contingencies - $600,000) 7 (4) SR 1002, Bridge No.9581 over Little 8 Marsh Creek, Curtin Township, Bridge 9 Replacement 2,200,000 10 (Base Project Allocation - $1,500,000) 11 (Land Allocation - $100,000) 12 (Design and Contingencies - $600,000) 13 (5) SR 1002, Bridge No.9582 over Marsh 14 Creek, Curtin Township, Bridge 15 Rehabilitation 1,300,000 16 (Base Project Allocation - $850,000) 17 (Land Allocation - $100,000) 18 (Design and Contingencies - $350,000) 19 (6) SR 0045 over Spruce Creek, Ferguson 20 Township, Bridge Replacement 320,000 21 (Base Project Allocation - $200,000) 22 (Land Allocation - $60,000) 23 (Design and Contingencies - $60,000) 24 (7) SR 2012 over Penns Creek, Gregg 25 Township, Bridge Replacement 380,000 26 (Base Project Allocation - $240,000) 27 (Land Allocation - $20,000) 28 (Design and Contingencies - $120,000) 29 (8) SR 2004 over Branch of Cedar Run, 30 Harris Township, Bridge Replacement 215,000 20080S1503B2474 - 87 -
1 (Base Project Allocation - $140,000) 2 (Design and Contingencies - $75,000) 3 (9) SR 1002, Bridge No.9590 over Marsh 4 Creek, Liberty Township, Bridge 5 Replacement 1,000,000 6 (Base Project Allocation - $300,000) 7 (Land Allocation - $100,000) 8 (Design and Contingencies - $600,000) 9 (10) SR 3045, TR T-28 over SR 0322, US 10 322, Patton Township, Bridge 11 Replacement 3,650,000 12 (Base Project Allocation - $3,000,000) 13 (Land Allocation - $200,000) 14 (Design and Contingencies - $450,000) 15 (11) SR 0045 over Branch of Elk Creek, 16 Penn Township, Bridge Replacement 500,000 17 (Base Project Allocation - $500,000) 18 (12) SR 3027 over Branch of Trout Run, 19 Rush Township, Bridge Replacement 275,000 20 (Base Project Allocation - $200,000) 21 (Design and Contingencies - $75,000) 22 (13) SR 4002, Bridge No.9775 over North 23 Fork of Beech Creek, Snow Shoe 24 Township, Bridge Replacement 1,300,000 25 (Base Project Allocation - $600,000) 26 (Land Allocation - $100,000) 27 (Design and Contingencies - $600,000) 28 (14) SR 4002, Bridge No.9780 over North 29 Fork of Beech Creek, Snow Shoe 30 Township, Bridge Replacement 2,951,000 20080S1503B2474 - 88 -
1 (Base Project Allocation - $2,069,000) 2 (Land Allocation - $270,000) 3 (Design and Contingencies - $612,000) 4 (15) Waddle Road over US 322, Patton 5 Township, Bridge Replacement 15,000,000 6 (16) SR 0144, SEDA-COG, BOGGS TOWNSHIP, <-- 7 BRIDGE REPLACEMENT 1,052,000 8 (BASE PROJECT ALLOCATION - $688,000) 9 (LAND ALLOCATION - $20,000) 10 (DESIGN AND CONTINGENCIES - $344,000) 11 (17) SR 0144 OVER SR 0150, ALT 0220, BOGGS 12 TOWNSHIP, BRIDGE REPLACEMENT 1,477,000 13 (BASE PROJECT ALLOCATION - $971,000) 14 (LAND ALLOCATION - $20,000) 15 (DESIGN AND CONTINGENCIES - $486,000) 16 (18) SR 0144 OVER LAUREL RUN, POTTER 17 TOWNSHIP, BRIDGE REPLACEMENT 187,000 18 (BASE PROJECT ALLOCATION - $111,000) 19 (LAND ALLOCATION - $20,000) 20 (DESIGN AND CONTINGENCIES - $56,000) 21 (19) SR 0144 OVER SOUTH FORK BEECH CREEK, 22 SNOW SHOE TOWNSHIP, BRIDGE REPLACEMENT 130,000 23 (BASE PROJECT ALLOCATION - $73,000) 24 (LAND ALLOCATION - $20,000) 25 (DESIGN AND CONTINGENCIES - $37,000) 26 (20) SR 0144 OVER YOCUM RUN, SPRING 27 TOWNSHIP, BRIDGE REPLACEMENT 190,000 28 (BASE PROJECT ALLOCATION - $113,000) 29 (LAND ALLOCATION - $20,000) 30 (DESIGN AND CONTINGENCIES - $57,000) 20080S1503B2474 - 89 -
1 (21) SR 0220 OVER LAUREL RUN, PORT MATILDA 2 BOROUGH, BRIDGE REPLACEMENT 254,000 3 (BASE PROJECT ALLOCATION - $156,000) 4 (LAND ALLOCATION - $20,000) 5 (DESIGN AND CONTINGENCIES - $78,000) 6 (22) SR 0220 OVER SUNNYSIDE HOLLOW RUN, 7 WORTH TOWNSHIP, BRIDGE REPLACEMENT 263,000 8 (BASE PROJECT ALLOCATION - $162,000) 9 (LAND ALLOCATION - $20,000) 10 (DESIGN AND CONTINGENCIES - $81,000) 11 (23) SR 0322 OVER RAILROAD, PATTON 12 TOWNSHIP, BRIDGE REPLACEMENT 835,000 13 (BASE PROJECT ALLOCATION - $543,000) 14 (LAND ALLOCATION - $20,000) 15 (DESIGN AND CONTINGENCIES - $272,000) 16 (24) SR 0322 OVER POTTER CREEK, POTTER 17 TOWNSHIP, BRIDGE REPLACEMENT 82,000 18 (BASE PROJECT ALLOCATION - $41,000) 19 (LAND ALLOCATION - $20,000) 20 (DESIGN AND CONTINGENCIES - $21,000) 21 (25) SR 0504 OVER WALLACE RUN, BOGGS 22 TOWNSHIP, BRIDGE REPLACEMENT 272,000 23 (BASE PROJECT ALLOCATION - $168,000) 24 (LAND ALLOCATION - $20,000) 25 (DESIGN AND CONTINGENCIES - $84,000) 26 (26) SR 1002 OVER BRANCH OF LITTLE MARSH 27 CREEK, BOGGS TOWNSHIP, BRIDGE 28 REPLACEMENT 115,000 29 (BASE PROJECT ALLOCATION - $63,000) 30 (LAND ALLOCATION - $20,000) 20080S1503B2474 - 90 -
1 (DESIGN AND CONTINGENCIES - $32,000) 2 (27) SR 1002 OVER MARSH CREEK, LIBERTY 3 TOWNSHIP, BRIDGE REPLACEMENT 244,000 4 (BASE PROJECT ALLOCATION - $149,000) 5 (LAND ALLOCATION - $20,000) 6 (DESIGN AND CONTINGENCIES - $75,000) 7 (28) SR 1002, BRIDGE NO.9576 OVER LITTLE 8 MARSH CREEK, BOGGS TOWNSHIP, BRIDGE 9 REPLACEMENT 104,000 10 (BASE PROJECT ALLOCATION - $56,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $28,000) 13 (29) SR 1002, BRIDGE NO.9580 OVER LITTLE 14 MARSH CREEK, CURTIN TOWNSHIP, BRIDGE 15 REPLACEMENT 840,000 16 (BASE PROJECT ALLOCATION - $400,000) 17 (LAND ALLOCATION - $100,000) 18 (DESIGN AND CONTINGENCIES - $340,000) 19 (30) SR 1002, BRIDGE NO.9581 OVER LITTLE 20 MARSH CREEK, CURTIN TOWNSHIP, BRIDGE 21 REPLACEMENT 1,040,000 22 (BASE PROJECT ALLOCATION - $600,000) 23 (LAND ALLOCATION - $100,000) 24 (DESIGN AND CONTINGENCIES - $340,000) 25 (31) SR 1002, BRIDGE NO.9589 OVER BIG RUN, 26 LIBERTY TOWNSHIP, BRIDGE REPLACEMENT 88,000 27 (BASE PROJECT ALLOCATION - $45,000) 28 (LAND ALLOCATION - $20,000) 29 (DESIGN AND CONTINGENCIES - $23,000) 30 (32) SR 2012 OVER PENNS CREEK, GREGG 20080S1503B2474 - 91 -
1 TOWNSHIP, BRIDGE REPLACEMENT 1,101,000 2 (BASE PROJECT ALLOCATION - $650,000) 3 (LAND ALLOCATION - $100,000) 4 (DESIGN AND CONTINGENCIES - $351,000) 5 (33) SR 2018 OVER PINE CREEK, HAINES 6 TOWNSHIP, BRIDGE REPLACEMENT 263,000 7 (BASE PROJECT ALLOCATION - $162,000) 8 (LAND ALLOCATION - $20,000) 9 (DESIGN AND CONTINGENCIES - $81,000) 10 (34) SR 3001 OVER BRANCH OF SPRING CREEK, 11 BENNER TOWNSHIP, BRIDGE REPLACEMENT 64,000 12 (BASE PROJECT ALLOCATION - $29,000) 13 (LAND ALLOCATION - $20,000) 14 (DESIGN AND CONTINGENCIES - $15,000) 15 (35) SR 3027 OVER MOSHANNON CREEK, RUSH 16 TOWNSHIP, BRIDGE REHABILITATION 2,050,000 17 (BASE PROJECT ALLOCATION - $1,550,000) 18 (LAND ALLOCATION - $100,000) 19 (DESIGN AND CONTINGENCIES - $400,000) 20 (36) SR 3027 OVER BRANCH OF TROUT RUN, 21 RUSH TOWNSHIP, BRIDGE REPLACEMENT 338,000 22 (BASE PROJECT ALLOCATION - $150,000) 23 (LAND ALLOCATION - $100,000) 24 (DESIGN AND CONTINGENCIES - $88,000) 25 (37) SR 3040 OVER BALD EAGLE CREEK, TAYLOR 26 TOWNSHIP, BRIDGE REPLACEMENT 284,000 27 (BASE PROJECT ALLOCATION - $176,000) 28 (LAND ALLOCATION - $20,000) 29 (DESIGN AND CONTINGENCIES - $88,000) 30 (38) SR 3040 OVER BRANCH OF BALD EAGLE 20080S1503B2474 - 92 -
1 CREEK, TAYLOR TOWNSHIP, BRIDGE 2 REPLACEMENT 122,000 3 (BASE PROJECT ALLOCATION - $68,000) 4 (LAND ALLOCATION - $20,000) 5 (DESIGN AND CONTINGENCIES - $34,000) 6 (39) SR 3040 OVER DIX RUN, UNION TOWNSHIP, 7 BRIDGE REPLACEMENT 205,000 8 (BASE PROJECT ALLOCATION - $123,000) 9 (LAND ALLOCATION - $20,000) 10 (DESIGN AND CONTINGENCIES - $62,000) 11 (40) SR 0322 OVER SR 3014, HARRIS 12 TOWNSHIP, BRIDGE REHABILITATION 251,000 13 (BASE PROJECT ALLOCATION - $251,000) 14 (41) SR 3010 OVER SPRING CREEK, COLLEGE 15 TOWNSHIP, BRIDGE REHABILITATION 136,000 16 (BASE PROJECT ALLOCATION - $136,000) 17 Section 19. Chester County. 18 (a) Local Bridges 19 (1) Westtown Township, Oakbourne Road, T- 20 359 over Goose Creek, Bridge 21 Replacement 480,000 22 (Base Project Allocation - $480,000) 23 (2) North Coventry Township, T-525 over 24 Pigeon Creek, Bridge Replacement 560,000 25 (Base Project Allocation - $560,000) 26 (3) East Brandywine Township, T-461 over 27 Brandywine Creek, Bridge 28 Rehabilitation 150,000 29 (Base Project Allocation - $150,000) 30 (4) West Brandywine Township, T-443 over 20080S1503B2474 - 93 -
1 Brandywine River, Bridge 2 Rehabilitation 75,000 3 (Base Project Allocation - $75,000) 4 (5) Cain Township, T-411 over Beaver 5 Creek, Bridge Replacement 600,000 6 (Base Project Allocation - $600,000) 7 (6) East Brandywine Township, T-424 over 8 Beaver Creek, Bridge Replacement 800,000 9 (Base Project Allocation - $800,000) 10 (7) DOWNINGTOWN BOROUGH, CHESTNUT STREET <-- 11 OVER AMTRAK AND CONRAIL TRACKS, BRIDGE 12 REPLACEMENT 1,275,000 13 (BASE PROJECT ALLOCATION - $960,000) 14 (LAND ALLOCATION - $315,000) 15 (8) TREDYFFRIN TOWNSHIP, T-431, WALKER 16 ROAD, THOMPSON BRIDGE OVER TROUT CREEK, 17 BRIDGE REPLACEMENT 278,000 18 (BASE PROJECT ALLOCATION - $225,000) 19 (LAND ALLOCATION - $15,000) 20 (DESIGN AND CONTINGENCIES - $38,000) 21 (9) TREDYFFRIN TOWNSHIP, WALKER COUNTY 22 BRIDGE NO.301 OVER TROUT CREEK, BRIDGE 23 REPLACEMENT 2,050,000 24 (BASE PROJECT ALLOCATION - $1,500,000) 25 (LAND ALLOCATION - $50,000) 26 (DESIGN AND CONTINGENCIES - $500,000) 27 (10) NEWLIN TOWNSHIP, LAUREL COUNTY BRIDGE 28 NO.92 OVER WEST BRANDYWINE, BRIDGE 29 REPLACEMENT 2,050,000 30 (BASE PROJECT ALLOCATION - $1,500,000) 20080S1503B2474 - 94 -
1 (LAND ALLOCATION - $50,000) 2 (DESIGN AND CONTINGENCIES - $500,000) 3 (11) EAST VINCENT AND WEST VINCENT 4 TOWNSHIPS, BERTOLET SCHOOL COUNTY 5 BRIDGE OVER FRENCH, BRIDGE 6 REHABILITATION 2,050,000 7 (BASE PROJECT ALLOCATION - $1,500,000) 8 (LAND ALLOCATION - $50,000) 9 (DESIGN AND CONTINGENCIES - $500,000) 10 (12) SOUTH COVENTRY TOWNSHIP, 11 COVENTRYVILLE COUNTY BRIDGE NO.100 OVER 12 FRENCH, BRIDGE REPLACEMENT 2,050,000 13 (BASE PROJECT ALLOCATION - $1,500,000) 14 (LAND ALLOCATION - $50,000) 15 (DESIGN AND CONTINGENCIES - $500,000) 16 (13) EAST VINCENT TOWNSHIP, SEVEN STARS 17 COUNTY BRIDGE NO.190 OVER FRENCH, 18 BRIDGE REHABILITATION 2,050,000 19 (BASE PROJECT ALLOCATION - $1,500,000) 20 (LAND ALLOCATION - $50,000) 21 (DESIGN AND CONTINGENCIES - $500,000) 22 (14) ELK TOWNSHIP, HICKORY RUN COUNTY 23 BRIDGE OVER LITTLE ELK CREEK, BRIDGE 24 REHABILITATION 2,050,000 25 (BASE PROJECT ALLOCATION - $1,500,000) 26 (LAND ALLOCATION - $50,000) 27 (DESIGN AND CONTINGENCIES - $500,000) 28 (15) TREDYFFRIN TOWNSHIP, THOMAS COUNTY 29 BRIDGE NO.300 OVER TROUT CREEK, BRIDGE 30 REPLACEMENT 2,050,000 20080S1503B2474 - 95 -
1 (BASE PROJECT ALLOCATION - $1,500,000) 2 (LAND ALLOCATION - $50,000) 3 (DESIGN AND CONTINGENCIES - $500,000) 4 (16) LOWER OXFORD TOWNSHIP, TOWNSHIP 5 COUNTY BRIDGE NO.297 OVER WEST BIG ELK 6 CREEK, BRIDGE REPLACEMENT 2,050,000 7 (BASE PROJECT ALLOCATION - $1,500,000) 8 (LAND ALLOCATION - $50,000) 9 (DESIGN AND CONTINGENCIES - $500,000) 10 (17) NORTH COVENTRY TOWNSHIP, WEST 11 CEDARSVILLE COUNTY BRIDGE OVER ECKERS 12 RUN, BRIDGE REPLACEMENT 2,050,000 13 (BASE PROJECT ALLOCATION - $1,500,000) 14 (LAND ALLOCATION - $50,000) 15 (DESIGN AND CONTINGENCIES - $500,000) 16 (18) TREDYFFRIN TOWNSHIP, WILSON COUNTY 17 BRIDGE NO.166 OVER VALLEY CREEK, BRIDGE 18 REHABILITATION 2,050,000 19 (BASE PROJECT ALLOCATION - $1,500,000) 20 (LAND ALLOCATION - $50,000) 21 (DESIGN AND CONTINGENCIES - $500,000) 22 (19) UPPER UWCHLAN AND EAST BRANDYWINE 23 TOWNSHIPS, NORTH REEDS COUNTY BRIDGE 24 NO.134 OVER EAST BRANDYWINE CREEK, 25 BRIDGE REPLACEMENT 2,050,000 26 (BASE PROJECT ALLOCATION - $1,500,000) 27 (LAND ALLOCATION - $50,000) 28 (DESIGN AND CONTINGENCIES - $500,000) 29 (20) WEST NANTMEAL TOWNSHIP, WYEBROOK 30 COUNTY BRIDGE NO.143 OVER EAST 20080S1503B2474 - 96 -
1 BRANDYWINE CREEK, BRIDGE 2 REHABILITATION 2,050,000 3 (BASE PROJECT ALLOCATION - $1,500,000) 4 (LAND ALLOCATION - $50,000) 5 (DESIGN AND CONTINGENCIES - $500,000) 6 (21) EAST PIKELAND, SPRING CITY, COUNTY 7 BRIDGE NO.205 OVER STONY RUN, BRIDGE 8 REPLACEMENT 2,050,000 9 (BASE PROJECT ALLOCATION - $1,500,000) 10 (LAND ALLOCATION - $50,000) 11 (DESIGN AND CONTINGENCIES - $500,000) 12 (22) SOUTH COVENTRY TOWNSHIP, BEALER ROAD 13 BRIDGE OVER PIGEON CREEK, BRIDGE 14 REPLACEMENT 1,180,000 15 (BASE PROJECT ALLOCATION - $900,000) 16 (LAND ALLOCATION - $40,000) 17 (DESIGN AND CONTINGENCIES - $240,000) 18 (23) WEST BRANDYWINE TOWNSHIP, ICEDALE 19 ROAD BMS 15-7244-0443-0001 BRIDGE OVER 20 WEST BRANCH OF BRANDYWINE CREEK, BRIDGE 21 REPLACEMENT 610,000 22 (BASE PROJECT ALLOCATION - $500,000) 23 (LAND ALLOCATION - $10,000) 24 (DESIGN AND CONTINGENCIES - $100,000) 25 (24) WEST BRANDYWINE TOWNSHIP, ICEDALE 26 ROAD BMS 15-7244-0443-0001 BRIDGE OVER 27 WEST BRANCH OF BRANDYWINE CREEK, BRIDGE 28 REPLACEMENT 610,000 29 (BASE PROJECT ALLOCATION - $500,000) 30 (LAND ALLOCATION - $10,000) 20080S1503B2474 - 97 -
1 (DESIGN AND CONTINGENCIES - $100,000) 2 (25) KENNETT TOWNSHIP, HILLENDALE ROAD 3 BRIDGE OVER OCTORARA RAILROAD, BRIDGE 4 REPLACEMENT 2,500,000 5 (BASE PROJECT ALLOCATION - $2,000,000) 6 (LAND ALLOCATION - $100,000) 7 (DESIGN AND CONTINGENCIES - $400,000) 8 (26) WEST FALLOWFIELD TOWNSHIP, HIGH POINT 9 ROAD OVER MUDDY RUN, BRIDGE 10 REHABILITATION 235,000 11 (BASE PROJECT ALLOCATION - $200,000) 12 (LAND ALLOCATION - $10,000) 13 (DESIGN AND CONTINGENCIES - $25,000) 14 (27) EAST MARLBOROUGH TOWNSHIP, EAST 15 LOCUST ROAD OVER EAST BRANCH OF RED 16 CLAY CREEK, BRIDGE REHABILITATION 710,000 17 (BASE PROJECT ALLOCATION - $500,000) 18 (LAND ALLOCATION - $10,000) 19 (DESIGN AND CONTINGENCIES - $200,000) 20 (28) EAST CALN TOWNSHIP, SKELP LEVEL 21 BRIDGE OVER NORFOLK SOUTHERN RAILROAD, 22 BRIDGE REPLACEMENT 2,100,000 23 (BASE PROJECT ALLOCATION - $1,500,000) 24 (LAND ALLOCATION - $100,000) 25 (DESIGN AND CONTINGENCIES - $500,000) 26 (29) WEST WHITELAND TOWNSHIP, SHOEN ROAD 27 OVER BRANCH OF CALLEY CREEK BRIDGE 28 REHABILITATION 610,000 29 (BASE PROJECT ALLOCATION - $500,000) 30 (LAND ALLOCATION - $10,000) 20080S1503B2474 - 98 -
1 (DESIGN AND CONTINGENCIES - $100,000) 2 (30) FRANKLIN TOWNSHIP, WALKER ROAD OVER 3 TRIBUTARY OF BIG ELK CREEK, BRIDGE 4 REPLACEMENT 570,000 5 (BASE PROJECT ALLOCATION - $500,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $50,000) 8 (31) SADSBURY TOWNSHIP, OCTORARA ROAD OVER 9 BUCK RUN, BRIDGE REHABILITATION 610,000 10 (BASE PROJECT ALLOCATION - $500,000) 11 (LAND ALLOCATION - $10,000) 12 (DESIGN AND CONTINGENCIES - $100,000) 13 (32) EAST COVENTRY TOWNSHIP, FULMER ROAD 14 OVER PIGEON CREEK, BRIDGE 15 REHABILITATION 610,000 16 (BASE PROJECT ALLOCATION - $500,000) 17 (LAND ALLOCATION - $10,000) 18 (DESIGN AND CONTINGENCIES - $100,000) 19 (33) EAST COVENTRY TOWNSHIP, KULP ROAD 20 OVER PIGEON CREEK, BRIDGE 21 REHABILITATION 610,000 22 (BASE PROJECT ALLOCATION - $500,000) 23 (LAND ALLOCATION - $10,000) 24 (DESIGN AND CONTINGENCIES - $100,000) 25 (34) EAST GOSHEN TOWNSHIP, RESERVOIR ROAD 26 OVER TRIBUTARY OF CHESTER CREEK, BRIDGE 27 REPLACEMENT 610,000 28 (BASE PROJECT ALLOCATION - $500,000) 29 (LAND ALLOCATION - $10,000) 30 (DESIGN AND CONTINGENCIES - $100,000) 20080S1503B2474 - 99 -
1 (35) EAST CALN TOWNSHIP, NORWOOD ROAD OVER 2 LUDWIGS RUN, BRIDGE REPLACEMENT 610,000 3 (BASE PROJECT ALLOCATION - $500,000) 4 (LAND ALLOCATION - $10,000) 5 (DESIGN AND CONTINGENCIES - $100,000) 6 (36) EAST FALLOWFIELD TOWNSHIP, FROG 7 HOLLOW ROAD OVER BRANCH OF BUCK RUN, 8 BRIDGE REPLACEMENT 610,000 9 (BASE PROJECT ALLOCATION - $500,000) 10 (LAND ALLOCATION - $10,000) 11 (DESIGN AND CONTINGENCIES - $100,000) 12 (37) UPPER OXFORD TOWNSHIP, FOREST MANOR 13 ROAD, COUNTY BRIDGE NO.318 OVER BIG ELK 14 CREEK, BRIDGE REPLACEMENT 2,050,000 15 (BASE PROJECT ALLOCATION - $1,500,000) 16 (LAND ALLOCATION - $50,000) 17 (DESIGN AND CONTINGENCIES - $500,000) 18 (b) State Bridges 19 (1) SR 0322, Brandywine Avenue over East 20 Branch of Brandywine Creek, East Caln 21 Township, Bridge Rehabilitation 63,000 22 (Base Project Allocation - $11,000) 23 (Land Allocation - $1,000) 24 (Design and Contingencies - $51,000) 25 (2) SR 1035, Linfield Road, over 26 Schuylkill River, East Coventry 27 Township, Bridge Rehabilitation 63,000 28 (Base Project Allocation - $11,000) 29 (Land Allocation - $1,000) 30 (Design and Contingencies - $51,000) 20080S1503B2474 - 100 -
1 (3) SR 3038, Burnt Hill Road over Branch 2 of Red Clay Creek, Kennett Township, 3 Bridge Rehabilitation 1,389,000 4 (Base Project Allocation - $96,000) 5 (Land Allocation - $31,000) 6 (Design and Contingencies - $1,262,000) 7 (4) Broad Run Road over East Branch of 8 White Clay Creek, London Britain 9 Township, Bridge Replacement 2,592,000 10 (Base Project Allocation - $2,000,000) 11 (Land Allocation - $100,000) 12 (Design and Contingencies - $492,000) 13 (5) SR 3044, Ewing Road over Middle Branch 14 of White Clay Creek, London Grove 15 Township, Bridge Replacement 2,000,000 16 (Base Project Allocation - $546,000) 17 (Land Allocation - $35,000) 18 (Design and Contingencies - $1,419,000) 19 (6) SR 4041, Harmonyville Road over Rock 20 Run, North Coventry Township, Bridge 21 Rehabilitation 63,000 22 (Base Project Allocation - $11,000) 23 (Land Allocation - $1,000) 24 (Design and Contingencies - $51,000) 25 (7) SR 1101, Keim Street over Pottstown 26 Bypass, North Coventry Township, Bridge 27 Rehabilitation 6,210,000 28 (Base Project Allocation - $5,560,000) 29 (Land Allocation - $100,000) 30 (Design and Contingencies - $550,000) 20080S1503B2474 - 101 -
1 (8) SR 0422, Pottstown Bypass over Ramp G 2 and Ramp H, North Coventry Township, 3 Bridge Rehabilitation 6,210,000 4 (Base Project Allocation - $5,560,000) 5 (Land Allocation - $100,000) 6 (Design and Contingencies - $550,000) 7 (9) SR 0052, Lenape Unionville Road over 8 Branch of Pocopson Creek, Pocopson 9 Township, Bridge Rehabilitation 63,000 10 (Base Project Allocation - $11,000) 11 (Land Allocation - $1,000) 12 (Design and Contingencies - $51,000) 13 (10) SR 0282, Creek Road, Bridge No.10179 14 over East Branch of Brandywine Creek, 15 Wallace Township, Bridge Replacement 2,000,000 16 (Base Project Allocation - $575,000) 17 (Land Allocation - $60,000) 18 (Design and Contingencies - $1,365,000) 19 (11) SR 0282, Creek Road, Bridge No.10180 20 over East Branch of Brandywine Creek, 21 Wallace Township, Bridge Replacement 2,000,000 22 (Base Project Allocation - $460,000) 23 (Land Allocation - $30,000) 24 (Design and Contingencies - $1,510,000) 25 (12) SR 4008, Indian Run Drive over Indian 26 Run, Wallace Township, Bridge 27 Replacement 1,500,000 28 (Base Project Allocation - $518,000) 29 (Land Allocation - $25,000) 30 (Design and Contingencies - $957,000) 20080S1503B2474 - 102 -
1 (13) SR 4018 over Pine Creek, Warwick 2 Township, Bridge Replacement 1,725,000 3 (Base Project Allocation - $1,000,000) 4 (Land Allocation - $150,000) 5 (Design and Contingencies - $575,000) 6 (14) SR 3027 over West Branch of 7 Brandywine Creek, West Bradford 8 Township, Bridge Rehabilitation 63,000 9 (Base Project Allocation - $11,000) 10 (Land Allocation - $1,000) 11 (Design and Contingencies - $51,000) 12 (15) SR 4011, Swinehart Road over Beaver 13 Creek, West Brandywine Township, Bridge 14 Rehabilitation 63,000 15 (Base Project Allocation - $11,000) 16 (Land Allocation - $1,000) 17 (Design and Contingencies - $51,000) 18 (16) SR 0401, Conestoga Road over Branch 19 of Pickering Creek, West Vincent 20 Township, Bridge Rehabilitation 63,000 21 (Base Project Allocation - $11,000) 22 (Land Allocation - $1,000) 23 (Design and Contingencies - $51,000) 24 (17) SR 3070, Lancaster Avenue over Branch 25 of Valley Creek, West Whiteland 26 Township, Bridge Rehabilitation 1,389,000 27 (Base Project Allocation - $96,000) 28 (Land Allocation - $31,000) 29 (Design and Contingencies - $1,262,000) 30 (18) SR 3100 over West Chester Bypass, 20080S1503B2474 - 103 -
1 West Whiteland Township, Bridge 2 Rehabilitation 63,000 3 (Base Project Allocation - $11,000) 4 (Land Allocation - $1,000) 5 (Design and Contingencies - $51,000) 6 (19) LOWER VALLEY ROAD, NEAR PARKESBURG, <-- 7 26H11 OVER OFFICERS RUN, ATGLEN 8 BOROUGH, BRIDGE REPLACEMENT 332,000 9 (BASE PROJECT ALLOCATION - $332,000) 10 (20) NORTH VALLEY ROAD OVER AMTRAK, 11 TREDYFFRIN TOWNSHIP, BRIDGE 12 REPLACEMENT 5,050,000 13 (BASE PROJECT ALLOCATION - $4,000,000) 14 (LAND ALLOCATION - $50,000) 15 (DESIGN AND CONTINGENCIES - $1,000,000) 16 (21) BROAD RUN ROAD OVER EAST BRANCH, 17 WHITE CLAY CREEK, LOWER BRITAIN 18 TOWNSHIP, BRIDGE REPLACEMENT 1,220,000 19 (BASE PROJECT ALLOCATION - $1,000,000) 20 (LAND ALLOCATION - $20,000) 21 (DESIGN AND CONTINGENCIES - $200,000) 22 (22) NORTHBROOK ROAD OVER WEST BRANCH 23 BRANDYWINE CREEK, WEST BRADFORD 24 TOWNSHIP, BRIDGE REPLACEMENT 660,000 25 (BASE PROJECT ALLOCATION - $550,000) 26 (LAND ALLOCATION - $80,000) 27 (DESIGN AND CONTINGENCIES - $30,000) 28 (23) STEELVILLE ROAD OVER OCTORARO CREEK, 29 WEST FALLOWFIELD TOWNSHIP, BRIDGE 30 REPLACEMENT 1,200,000 20080S1503B2474 - 104 -
1 (BASE PROJECT ALLOCATION - $1,000,000) 2 (LAND ALLOCATION - $100,000) 3 (DESIGN AND CONTINGENCIES - $100,000) 4 (24) EDENTON ROAD OVER RATTLESNAKE RUN, 5 UPPER OXFORD TOWNSHIP, BRIDGE 6 REPLACEMENT 1,170,000 7 (BASE PROJECT ALLOCATION - $1,000,000) 8 (LAND ALLOCATION - $20,000) 9 (DESIGN AND CONTINGENCIES - $150,000) 10 (25) SR 1005 OVER PAOLI AMTRAK LINE <-- 11 TREDYFFRIN TOWNSHIP, BRIDGE 12 REHABILITATION 15,000,000 13 (BASE PROJECT ALLOCATION - $15,000,000) 14 Section 20. Clarion County. 15 (a) Local Bridges (Reserved) 16 (b) State Bridges 17 (1) SR 0208 over Tributary of Beaver 18 Creek, Beaver Township, Bridge 19 Replacement 250,000 20 (Base Project Allocation - $70,000) 21 (Land Allocation - $40,000) 22 (Design and Contingencies - $140,000) 23 (2) SR 0338 over Tributary of Canoe Creek, 24 Beaver Township, Bridge Replacement 247,000 25 (Base Project Allocation - $67,000) 26 (Land Allocation - $40,000) 27 (Design and Contingencies - $140,000) 28 (3) SR 1007 over Tributary of Brush Run, 29 Clarion Township, Bridge Replacement 242,000 30 (Base Project Allocation - $62,000) 20080S1503B2474 - 105 -
1 (Land Allocation - $40,000) 2 (Design and Contingencies - $140,000) 3 (4) SR 0322 over Tributary of Deer Creek, 4 Elk Township, Bridge Replacement 293,000 5 (Base Project Allocation - $113,000) 6 (Land Allocation - $40,000) 7 (Design and Contingencies - $140,000) 8 (5) SR 0322 over Deer Creek, Elk Township, 9 Bridge Replacement 471,000 10 (Base Project Allocation - $291,000) 11 (Land Allocation - $40,000) 12 (Design and Contingencies - $140,000) 13 (6) SR 0036 over Henry Run, Farmington 14 Township, Bridge Rehabilitation 233,000 15 (Base Project Allocation - $53,000) 16 (Land Allocation - $40,000) 17 (Design and Contingencies - $140,000) 18 (7) SR 0036 over Toby Creek, Farmington 19 Township, Bridge Replacement 267,000 20 (Base Project Allocation - $87,000) 21 (Land Allocation - $40,000) 22 (Design and Contingencies - $140,000) 23 (8) SR 0036 over Barlett Run, Farmington 24 Township, Bridge Replacement 251,000 25 (Base Project Allocation - $71,000) 26 (Land Allocation - $40,000) 27 (Design and Contingencies - $140,000) 28 (9) SR 0066 over Toms Run, Farmington 29 Township, Bridge Replacement 219,000 30 (Base Project Allocation - $39,000) 20080S1503B2474 - 106 -
1 (Land Allocation - $40,000) 2 (Design and Contingencies - $140,000) 3 (10) SR 1015 over Browns Run, Farmington 4 Township, Bridge Replacement 228,000 5 (Base Project Allocation - $48,000) 6 (Land Allocation - $40,000) 7 (Design and Contingencies - $140,000) 8 (11) SR 4004 over Licking Creek, 9 Farmington Township, Bridge 10 Replacement 241,000 11 (Base Project Allocation - $61,000) 12 (Land Allocation - $40,000) 13 (Design and Contingencies - $140,000) 14 (12) SR 4004, Bridge No.11080 over 15 Tributary of Licking Creek, Farmington 16 Township, Bridge Replacement 271,000 17 (Base Project Allocation - $91,000) 18 (Land Allocation - $40,000) 19 (Design and Contingencies - $140,000) 20 (13) SR 4015 over Licking Creek, Knox 21 Township, Bridge Replacement 409,000 22 (Base Project Allocation - $229,000) 23 (Land Allocation - $40,000) 24 (Design and Contingencies - $140,000) 25 (14) SR 0058 over Tributary of Clarion 26 River, Licking Township, Bridge 27 Replacement 230,000 28 (Base Project Allocation - $50,000) 29 (Land Allocation - $40,000) 30 (Design and Contingencies - $140,000) 20080S1503B2474 - 107 -
1 (15) SR 0058 over Rocks Run, Licking 2 Township, Bridge Replacement 206,000 3 (Base Project Allocation - $26,000) 4 (Land Allocation - $40,000) 5 (Design and Contingencies - $140,000) 6 (16) SR 2009 over Cherry Run, Licking 7 Township, Bridge Replacement 354,000 8 (Base Project Allocation - $174,000) 9 (Land Allocation - $40,000) 10 (Design and Contingencies - $140,000) 11 (17) SR 0066 over Glade Run, Limestone 12 Township, Bridge Replacement 223,000 13 (Base Project Allocation - $43,000) 14 (Land Allocation - $40,000) 15 (Design and Contingencies - $140,000) 16 (18) SR 2001 over Tributary of Little 17 Piney Creek, Limestone Township, Bridge 18 Replacement 252,000 19 (Base Project Allocation - $72,000) 20 (Land Allocation - $40,000) 21 (Design and Contingencies - $140,000) 22 (19) SR 2001 over Piney Creek, Limestone 23 Township, Bridge Rehabilitation 195,000 24 (Base Project Allocation - $150,000) 25 (Land Allocation - $15,000) 26 (Design and Contingencies - $30,000) 27 (20) SR 2005 over Piney Creek, Limestone 28 Township, Bridge Replacement 220,000 29 (Base Project Allocation - $40,000) 30 (Land Allocation - $40,000) 20080S1503B2474 - 108 -
1 (Design and Contingencies - $140,000) 2 (21) SR 2015 over Little Piney Creek, 3 Limestone Township, Bridge 4 Rehabilitation 235,000 5 (Base Project Allocation - $150,000) 6 (Land Allocation - $15,000) 7 (Design and Contingencies - $70,000) 8 (22) SR 0861 over Fiddlers Run, Madison 9 Township, Bridge Replacement 339,000 10 (Base Project Allocation - $159,000) 11 (Land Allocation - $40,000) 12 (Design and Contingencies - $140,000) 13 (23) SR 0861, Bridge No.10996 over Wildcat 14 Run, Madison Township, Bridge 15 Replacement 445,000 16 (Base Project Allocation - $265,000) 17 (Land Allocation - $40,000) 18 (Design and Contingencies - $140,000) 19 (24) SR 0861, Bridge No.10997 over Wildcat 20 Run, Madison Township, Bridge 21 Replacement 338,000 22 (Base Project Allocation - $158,000) 23 (Land Allocation - $40,000) 24 (Design and Contingencies - $140,000) 25 (25) SR 3004 over Kissinger Run, Madison 26 Township, Bridge Replacement 233,000 27 (Base Project Allocation - $53,000) 28 (Land Allocation - $40,000) 29 (Design and Contingencies - $140,000) 30 (26) SR 0368 over Tributary of Allegheny 20080S1503B2474 - 109 -
1 River, Perry Township, Bridge 2 Replacement 291,000 3 (Base Project Allocation - $111,000) 4 (Land Allocation - $40,000) 5 (Design and Contingencies - $140,000) 6 (27) SR 2011 over Little Licking Creek, 7 Piney Township, Bridge Replacement 276,000 8 (Base Project Allocation - $96,000) 9 (Land Allocation - $40,000) 10 (Design and Contingencies - $140,000) 11 (28) SR 0028 over Pine Creek, Redbank 12 Township, Bridge Replacement 405,000 13 (Base Project Allocation - $350,000) 14 (Land Allocation - $15,000) 15 (Design and Contingencies - $40,000) 16 (29) SR 8002 over Richey Run, Richland 17 Township, Bridge Replacement 346,000 18 (Base Project Allocation - $166,000) 19 (Land Allocation - $40,000) 20 (Design and Contingencies - $140,000) 21 (30) SR 4007 over Turkey Run, Salem 22 Township, Bridge Replacement 206,000 23 (Base Project Allocation - $26,000) 24 (Land Allocation - $40,000) 25 (Design and Contingencies - $140,000) 26 (31) SR 0058 over Hodil Run, Sligo 27 Borough, Bridge Replacement 240,000 28 (Base Project Allocation - $60,000) 29 (Land Allocation - $40,000) 30 (Design and Contingencies - $140,000) 20080S1503B2474 - 110 -
1 (32) SR 3002 over Black Fox Run, Toby 2 Township, Bridge Replacement 260,000 3 (Base Project Allocation - $80,000) 4 (Land Allocation - $40,000) 5 (Design and Contingencies - $140,000) 6 (33) SR 3012 over Tributary of Cherry Run, 7 Toby Township, Bridge Replacement 247,000 8 (Base Project Allocation - $67,000) 9 (Land Allocation - $40,000) 10 (Design and Contingencies - $140,000) 11 (34) SR 4004, Bridge No.11078 over 12 Tributary of Licking Creek, Washington 13 Township, Bridge Replacement 255,000 14 (Base Project Allocation - $75,000) 15 (Land Allocation - $40,000) 16 (Design and Contingencies - $140,000) 17 (35) SR 4015 over Mahles Run, Washington 18 Township, Bridge Replacement 240,000 19 (Base Project Allocation - $60,000) 20 (Land Allocation - $40,000) 21 (Design and Contingencies - $140,000) 22 (36) SR 4017 over Little Tionesta Creek, 23 Washington Township, Bridge 24 Replacement 273,000 25 (Base Project Allocation - $93,000) 26 (Land Allocation - $40,000) 27 (Design and Contingencies - $140,000) 28 (37) SR 4035 over Mahles Run, Washington 29 Township, Bridge Replacement 239,000 30 (Base Project Allocation - $59,000) 20080S1503B2474 - 111 -
1 (Land Allocation - $40,000) 2 (Design and Contingencies - $140,000) 3 (38) SR 4035 over East Branch of Hemlock 4 Run, Washington Township, Bridge 5 Replacement 253,000 6 (Base Project Allocation - $73,000) 7 (Land Allocation - $40,000) 8 (Design and Contingencies - $140,000) 9 (39) SR 2001, FOREST DRIVE OVER TRIBUTARY <-- 10 OF LITTLE D290 PINEY CREEK, LIMESTONE 11 TOWNSHIP, BRIDGE REPLACEMENT 172,000 12 (BASE PROJECT ALLOCATION - $156,000) 13 (LAND ALLOCATION - $16,000) 14 Section 21. Clearfield County. 15 (a) Local Bridges 16 (1) City of DuBois, Washington Avenue over 17 Pentz Run, Bridge Replacement 451,000 18 (Base Project Allocation - $371,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $70,000) 21 (2) City of DuBois, Weber Avenue over 22 Pentz Run, Bridge Replacement 363,000 23 (Base Project Allocation - $287,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $66,000) 26 (3) Sandy Township, Sewage Treatment Plant 27 Access Road over Sandy Lick Creek, 28 Bridge Rehabilitation 115,000 29 (Base Project Allocation - $100,000) 30 (Design and Contingencies - $15,000) 20080S1503B2474 - 112 -
1 (4) City of DuBois, Park Avenue over Pentz 2 Run, Bridge Rehabilitation 57,000 3 (Base Project Allocation - $50,000) 4 (Design and Contingencies - $7,000) 5 (5) City of DuBois, Beaver Drive over 6 McCracken Run, Bridge Rehabilitation 86,000 7 (Base Project Allocation - $80,000) 8 (Design and Contingencies - $6,000) 9 (6) City of DuBois, Spruce Alley over 10 Pentz Run, Bridge Rehabilitation 92,000 11 (Base Project Allocation - $80,000) 12 (Design and Contingencies - $12,000) 13 (7) City of DuBois, Juniata Street over 14 Clear Run, Bridge Replacement 475,000 15 (Base Project Allocation - $400,000) 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $55,000) 18 (8) City of DuBois, Franklin Street over 19 Pentz Run, Bridge Restoration 125,000 20 (Base Project Allocation - $110,000) 21 (Design and Contingencies - $15,000) 22 (9) Brady Township, TR-341 over Unnamed 23 Tributary of East Branch of 24 Sinnemahoning Creek, Bridge 25 Replacement 12,000 26 (Base Project Allocation - $10,000) 27 (Design and Contingencies - $2,000) 28 (10) BELL TOWNSHIP, SR 0036 OVER SR 0036, <-- 29 BRIDGE REPLACEMENT 45,000 30 (BASE PROJECT ALLOCATION - $25,000) 20080S1503B2474 - 113 -
1 (LAND ALLOCATION - $20,000) 2 (11) BRADFORD TOWNSHIP, SR 0970 OVER SR 3 0970, BRIDGE REPLACEMENT 45,000 4 (BASE PROJECT ALLOCATION - $25,000) 5 (LAND ALLOCATION - $20,000) 6 (12) COVINGTON TOWNSHIP, T-637 OVER DEER 7 CREEK, BRIDGE REPLACEMENT 300,000 8 (BASE PROJECT ALLOCATION - $200,000) 9 (LAND ALLOCATION - $50,000) 10 (DESIGN AND CONTINGENCIES - $50,000) 11 (13) CURWENSVILLE BOROUGH, SR 0879, BRIDGE 12 NO.11550 OVER SR 0879, BRIDGE 13 REPLACEMENT 45,000 14 (BASE PROJECT ALLOCATION - $25,000) 15 (LAND ALLOCATION - $20,000) 16 (14) CURWENSVILLE BOROUGH, SR 0879, BRIDGE 17 NO.11552 OVER SR 0879, BRIDGE 18 REPLACEMENT 45,000 19 (BASE PROJECT ALLOCATION - $25,000) 20 (LAND ALLOCATION - $20,000) 21 (15) CITY OF DUBOIS, WEBER AVENUE, BRIDGE 22 NO.11959 OVER PENTZ RUN, BRIDGE 23 REPLACEMENT 300,000 24 (BASE PROJECT ALLOCATION - $200,000) 25 (LAND ALLOCATION - $50,000) 26 (DESIGN AND CONTINGENCIES - $50,000) 27 (16) CITY OF DUBOIS, WEBER AVENUE, BRIDGE 28 NO.11962 OVER PENTZ RUN, BRIDGE 29 REPLACEMENT 300,000 30 (BASE PROJECT ALLOCATION - $200,000) 20080S1503B2474 - 114 -
1 (LAND ALLOCATION - $50,000) 2 (DESIGN AND CONTINGENCIES - $50,000) 3 (17) CITY OF DUBOIS, WEBER AVENUE, BRIDGE 4 NO.11965 OVER PENTZ RUN, BRIDGE 5 REPLACEMENT 300,000 6 (BASE PROJECT ALLOCATION - $200,000) 7 (LAND ALLOCATION - $50,000) 8 (DESIGN AND CONTINGENCIES - $50,000) 9 (18) GREENWOOD TOWNSHIP, T-420 OVER CURRY 10 RUN, BRIDGE REPLACEMENT 300,000 11 (BASE PROJECT ALLOCATION - $200,000) 12 (LAND ALLOCATION - $50,000) 13 (DESIGN AND CONTINGENCIES - $50,000) 14 (19) KNOX TOWNSHIP, T-565 OVER POTTS RUN, 15 BRIDGE REPLACEMENT 300,000 16 (BASE PROJECT ALLOCATION - $200,000) 17 (LAND ALLOCATION - $50,000) 18 (DESIGN AND CONTINGENCIES - $50,000) 19 (20) LAWRENCE TOWNSHIP, RJ CORMAN OVER SR 20 1001, BRIDGE REPLACEMENT 45,000 21 (BASE PROJECT ALLOCATION - $25,000) 22 (LAND ALLOCATION - $20,000) 23 (21) SANDY TOWNSHIP, T-372 OVER SANDY LICK 24 CREEK, BRIDGE REPLACEMENT 300,000 25 (BASE PROJECT ALLOCATION - $200,000) 26 (LAND ALLOCATION - $50,000) 27 (DESIGN AND CONTINGENCIES - $50,000) 28 (b) State Bridges 29 (1) SR 0219 over Little Anderson Creek, 30 Bloom Township, Bridge Replacement 1,725,000 20080S1503B2474 - 115 -
1 (Base Project Allocation - $1,100,000) 2 (Land Allocation - $125,000) 3 (Design and Contingencies - $500,000) 4 (2) SR 3014 over North Camp Run, Chest 5 Township, Bridge Replacement 296,000 6 (Base Project Allocation - $196,000) 7 (Land Allocation - $30,000) 8 (Design and Contingencies - $70,000) 9 (3) SR 0080, Bridge No.11323 over SR 0053, 10 PA 53, Cooper Township, Bridge 11 Rehabilitation 215,000 12 (Base Project Allocation - $200,000) 13 (Design and Contingencies - $15,000) 14 (4) SR 0080, Bridge No.11324 over SR 0053, 15 PA 53, Cooper Township, Bridge 16 Rehabilitation 215,000 17 (Base Project Allocation - $200,000) 18 (Design and Contingencies - $15,000) 19 (5) SR 0080, Bridge No.11326 over SR 2037, 20 Cooper Township, Bridge Rehabilitation 215,000 21 (Base Project Allocation - $200,000) 22 (Design and Contingencies - $15,000) 23 (6) SR 0080, Bridge No.11327 over SR 2037, 24 Cooper Township, Bridge Rehabilitation 215,000 25 (Base Project Allocation - $200,000) 26 (Design and Contingencies - $15,000) 27 (7) SR 2035 over I-80, Cooper Township, 28 Bridge Rehabilitation 260,000 29 (Base Project Allocation - $240,000) 30 (Design and Contingencies - $20,000) 20080S1503B2474 - 116 -
1 (8) SR 1009, Bridge No.11660 over I-80, 2 Graham Township, Bridge Rehabilitation 260,000 3 (Base Project Allocation - $240,000) 4 (Design and Contingencies - $20,000) 5 (9) SR 1009, Bridge No.11661 over I-80, 6 Graham Township, Bridge Rehabilitation 260,000 7 (Base Project Allocation - $240,000) 8 (Design and Contingencies - $20,000) 9 (10) SR 0153 over Bennett Branch, Huston 10 Township, Bridge Replacement 1,400,000 11 (Base Project Allocation - $1,000,000) 12 (Land Allocation - $200,000) 13 (Design and Contingencies - $200,000) 14 (11) SR 4021 over Negro Hollow, Huston 15 Township, Bridge Replacement 180,000 16 (Base Project Allocation - $110,000) 17 (Land Allocation - $30,000) 18 (Design and Contingencies - $40,000) 19 (12) SR 3005 over South Witmer Run, Irvona 20 Borough, Bridge Replacement 616,000 21 (Base Project Allocation - $464,000) 22 (Land Allocation - $30,000) 23 (Design and Contingencies - $122,000) 24 (13) SR 1015, TR T-519 over I-80, Lawrence 25 Township, Bridge Rehabilitation 260,000 26 (Base Project Allocation - $240,000) 27 (Design and Contingencies - $20,000) 28 (14) SR 0153, Bridge No.11361 over I-80, 29 Pine Township, Bridge Rehabilitation 260,000 30 (Base Project Allocation - $240,000) 20080S1503B2474 - 117 -
1 (Design and Contingencies - $20,000) 2 (15) SR 0153, Bridge No.11362 over I-80, 3 Pine Township, Bridge Rehabilitation 260,000 4 (Base Project Allocation - $240,000) 5 (Design and Contingencies - $20,000) 6 (16) SR 0255 over Sandy Lick Creek, Sandy 7 Township, Bridge Replacement 900,000 8 (Base Project Allocation - $500,000) 9 (Land Allocation - $200,000) 10 (Design and Contingencies - $200,000) 11 (17) SR 4015 over I-80, Sandy Township, 12 Bridge Rehabilitation 260,000 13 (Base Project Allocation - $240,000) 14 (Design and Contingencies - $20,000) 15 (18) SR 0830, PA 830 over Slab Run, Sandy 16 Township, Bridge Rehabilitation 1,200,000 17 (Base Project Allocation - $1,164,000) 18 (Land Allocation - $4,000) 19 (Design and Contingencies - $32,000) 20 (19) SR 0830, PA 830 over Wolf Run, Sandy 21 Township, Bridge Replacement 5,396,000 22 (Base Project Allocation - $5,237,000) 23 (Land Allocation - $15,000) 24 (Design and Contingencies - $144,000) 25 (20) SR 2013 over Beaver Run, Woodward 26 Township, Bridge Replacement 268,000 27 (Base Project Allocation - $180,000) 28 (Land Allocation - $30,000) 29 (Design and Contingencies - $58,000) 30 (21) SR 4019 over Juniata Run, City of 20080S1503B2474 - 118 -
1 DuBois, Bridge Replacement 1,000,000 2 (Base Project Allocation - $1,000,000) 3 (22) I-80 OVER SR 2037, COOPER TOWNSHIP, <-- 4 BRIDGE REHABILITATION 710,000 5 (BASE PROJECT ALLOCATION - $460,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $230,000) 8 (23) SR 0036 OVER TRIBUTARY OF BEAR RUN, 9 BELL TOWNSHIP, BRIDGE REPLACEMENT 50,000 10 (BASE PROJECT ALLOCATION - $20,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $10,000) 13 (24) SR 0036 OVER SNYDER RUN, BELL 14 TOWNSHIP, BRIDGE REPLACEMENT 119,000 15 (BASE PROJECT ALLOCATION - $66,000) 16 (LAND ALLOCATION - $20,000) 17 (DESIGN AND CONTINGENCIES - $33,000) 18 (25) SR 0036 OVER WILSON RUN, NEWBURG 19 BOROUGH, BRIDGE REPLACEMENT 200,000 20 (BASE PROJECT ALLOCATION - $120,000) 21 (LAND ALLOCATION - $20,000) 22 (DESIGN AND CONTINGENCIES - $60,000) 23 (26) SR 0036 OVER MOSS RUN, WESTOVER 24 BOROUGH, BRIDGE REPLACEMENT 96,000 25 (BASE PROJECT ALLOCATION - $51,000) 26 (LAND ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $26,000) 28 (27) SR 0036 OVER BRANCH OF CHEST CREEK, 29 WESTOVER BOROUGH, BRIDGE REPLACEMENT 86,000 30 (BASE PROJECT ALLOCATION - $44,000) 20080S1503B2474 - 119 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $22,000) 3 (28) SR 0053 OVER BLUE RUN, GLEN HOPE 4 BOROUGH, BRIDGE REPLACEMENT 50,000 5 (BASE PROJECT ALLOCATION - $20,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $10,000) 8 (29) SR 0053 OVER HICKORY RUN, GLEN HOPE 9 BOROUGH, BRIDGE REPLACEMENT 55,000 10 (BASE PROJECT ALLOCATION - $23,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $12,000) 13 (30) SR 0053 OVER CLEARFIELD CREEK, IRVONA 14 BOROUGH, BRIDGE REPLACEMENT 9,572,000 15 (BASE PROJECT ALLOCATION - $8,972,000) 16 (LAND ALLOCATION - $100,000) 17 (DESIGN AND CONTINGENCIES - $500,000) 18 (31) SR 0153 OVER GOSS RUN, BRISBIN 19 BOROUGH, BRIDGE REPLACEMENT 56,000 20 (BASE PROJECT ALLOCATION - $24,000) 21 (LAND ALLOCATION - $20,000) 22 (DESIGN AND CONTINGENCIES - $12,000) 23 (32) SR 0153 OVER WILSON RUN, HUSTON 24 TOWNSHIP, BRIDGE REPLACEMENT 122,000 25 (BASE PROJECT ALLOCATION - $68,000) 26 (LAND ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $34,000) 28 (33) SR 0153 OVER WISE RUN, HUSTON 29 TOWNSHIP, BRIDGE REPLACEMENT 68,000 30 (BASE PROJECT ALLOCATION - $32,000) 20080S1503B2474 - 120 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $16,000) 3 (34) SR 0153 OVER WHITESIDE RUN, WOODWARD 4 TOWNSHIP, BRIDGE REPLACEMENT 200,000 5 (BASE PROJECT ALLOCATION - $120,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $60,000) 8 (35) SR 0219 OVER MARTIN RUN, BELL 9 TOWNSHIP, BRIDGE REPLACEMENT 61,000 10 (BASE PROJECT ALLOCATION - $27,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $14,000) 13 (36) SR 0219 OVER TRIBUTARY OF SUSQUEHANNA 14 RIVER, BELL TOWNSHIP, BRIDGE 15 REPLACEMENT 56,000 16 (BASE PROJECT ALLOCATION - $24,000) 17 (LAND ALLOCATION - $20,000) 18 (DESIGN AND CONTINGENCIES - $12,000) 19 (37) SR 0219 OVER CURRY RUN, GREENWOOD 20 TOWNSHIP, BRIDGE REPLACEMENT 272,000 21 (BASE PROJECT ALLOCATION - $168,000) 22 (LAND ALLOCATION - $20,000) 23 (DESIGN AND CONTINGENCIES - $84,000) 24 (38) SR 0219 OVER LEE RUN, GREENWOOD 25 TOWNSHIP, BRIDGE REPLACEMENT 97,000 26 (BASE PROJECT ALLOCATION - $51,000) 27 (LAND ALLOCATION - $20,000) 28 (DESIGN AND CONTINGENCIES - $26,000) 29 (39) SR 0219 OVER POPLAR RUN, GREENWOOD 30 TOWNSHIP, BRIDGE REPLACEMENT 182,000 20080S1503B2474 - 121 -
1 (BASE PROJECT ALLOCATION - $108,000) 2 (LAND ALLOCATION - $20,000) 3 (DESIGN AND CONTINGENCIES - $54,000) 4 (40) SR 0219 OVER PENTZ RUN, SANDY 5 TOWNSHIP, BRIDGE REPLACEMENT 122,000 6 (BASE PROJECT ALLOCATION - $68,000) 7 (LAND ALLOCATION - $20,000) 8 (DESIGN AND CONTINGENCIES - $34,000) 9 (41) SR 0219 OVER TRIBUTARY OF WOLF RUN, 10 SANDY TOWNSHIP, BRIDGE REPLACEMENT 164,000 11 (BASE PROJECT ALLOCATION - $96,000) 12 (LAND ALLOCATION - $20,000) 13 (DESIGN AND CONTINGENCIES - $48,000) 14 (42) SR 0219, BRIDGE NO.11428 OVER SLAB 15 RUN, SANDY TOWNSHIP, BRIDGE 16 REPLACEMENT 193,000 17 (BASE PROJECT ALLOCATION - $115,000) 18 (LAND ALLOCATION - $20,000) 19 (DESIGN AND CONTINGENCIES - $58,000) 20 (43) SR 0219, BRIDGE NO.11429 OVER SLAB 21 RUN, SANDY TOWNSHIP, BRIDGE 22 REPLACEMENT 265,000 23 (BASE PROJECT ALLOCATION - $163,000) 24 (LAND ALLOCATION - $20,000) 25 (DESIGN AND CONTINGENCIES - $82,000) 26 (44) SR 0322 OVER WEST BRANCH OF 27 SUSQUEHANNA RIVER, CLEARFIELD BOROUGH, 28 BRIDGE REHABILITATION 786,000 29 (BASE PROJECT ALLOCATION - $686,000) 30 (LAND ALLOCATION - $100,000) 20080S1503B2474 - 122 -
1 (45) SR 0322 OVER CLEARFIELD CREEK, 2 LAWRENCE TOWNSHIP, BRIDGE 3 REHABILITATION 1,147,000 4 (BASE PROJECT ALLOCATION - $1,047,000) 5 (LAND ALLOCATION - $100,000) 6 (46) SR 1006, BRIDGE NO.11650 OVER I-80, 7 LAWRENCE TOWNSHIP, BRIDGE 8 REHABILITATION 719,000 9 (BASE PROJECT ALLOCATION - $466,000) 10 (LAND ALLOCATION - $20,000) 11 (DESIGN AND CONTINGENCIES - $233,000) 12 (47) SR 1006, BRIDGE NO.11651 OVER I-80, 13 LAWRENCE TOWNSHIP, BRIDGE 14 REHABILITATION 686,000 15 (BASE PROJECT ALLOCATION - $444,000) 16 (LAND ALLOCATION - $20,000) 17 (DESIGN AND CONTINGENCIES - $222,000) 18 (48) SR 1012 OVER I-80, BRADFORD TOWNSHIP, 19 BRIDGE REHABILITATION 774,000 20 (BASE PROJECT ALLOCATION - $674,000) 21 (LAND ALLOCATION - $100,000) 22 (49) SR 0253 OVER BRANCH OF LITTLE MUDDY 23 RUN, GULICH TOWNSHIP, BRIDGE 24 REPLACEMENT 92,000 25 (BASE PROJECT ALLOCATION - $48,000) 26 (LAND ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $24,000) 28 (50) SR 0255 OVER BRANCH OF HEATH RUN, 29 HUSTON TOWNSHIP, BRIDGE REPLACEMENT 50,000 30 (BASE PROJECT ALLOCATION - $20,000) 20080S1503B2474 - 123 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $10,000) 3 (51) SR 0255 OVER BRANCH OF BENNETT RUN, 4 HUSTON TOWNSHIP, BRIDGE REPLACEMENT 73,000 5 (BASE PROJECT ALLOCATION - $35,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $18,000) 8 (52) SR 0255 OVER HEATH RUN, HUSTON 9 TOWNSHIP, BRIDGE REPLACEMENT 80,000 10 (BASE PROJECT ALLOCATION - $40,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $20,000) 13 (53) SR 0255 OVER NARROWS CREEK, SANDY 14 TOWNSHIP, BRIDGE REPLACEMENT 215,000 15 (BASE PROJECT ALLOCATION - $130,600) 16 (LAND ALLOCATION - $20,000) 17 (DESIGN AND CONTINGENCIES - $65,000) 18 (54) SR 0322 OVER LAUREL RUN, DECATUR 19 TOWNSHIP, BRIDGE REPLACEMENT 356,000 20 (BASE PROJECT ALLOCATION - $224,000) 21 (LAND ALLOCATION - $20,000) 22 (DESIGN AND CONTINGENCIES - $112,000) 23 (55) SR 0410 OVER STUMP CREEK, BRADY 24 TOWNSHIP, BRIDGE REPLACEMENT 68,000 25 (BASE PROJECT ALLOCATION - $32,000) 26 (LAND ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $16,000) 28 (56) SR 0453 OVER LOST RUN, BIGLER 29 TOWNSHIP, BRIDGE REPLACEMENT 85,000 30 (BASE PROJECT ALLOCATION - $43,000) 20080S1503B2474 - 124 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $22,000) 3 (57) SR 0453 OVER WEST BRANCH OF 4 SUSQUEHANNA RIVER, CURWENSVILLE 5 BOROUGH, BRIDGE REHABILITATION 1,897,000 6 (BASE PROJECT ALLOCATION - $1,797,000) 7 (LAND ALLOCATION - $100,000) 8 (58) SR 0729 OVER CAMPBELL RUN, FERGUSON 9 TOWNSHIP, BRIDGE REPLACEMENT 77,000 10 (BASE PROJECT ALLOCATION - $38,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $19,000) 13 (59) SR 0729 OVER CLEARFIELD CREEK, GLEN 14 HOPE BOROUGH, BRIDGE REPLACEMENT 487,000 15 (BASE PROJECT ALLOCATION - $311,000) 16 (LAND ALLOCATION - $20,000) 17 (DESIGN AND CONTINGENCIES - $156,000) 18 (60) SR 0729 OVER COMFORT RUN, JORDAN 19 TOWNSHIP, BRIDGE REPLACEMENT 52,000 20 (BASE PROJECT ALLOCATION - $21,000) 21 (LAND ALLOCATION - $20,000) 22 (DESIGN AND CONTINGENCIES - $11,000) 23 (61) SR 0879 OVER DEER CREEK, GIRARD 24 TOWNSHIP, BRIDGE REPLACEMENT 184,000 25 (BASE PROJECT ALLOCATION - $109,000) 26 (LAND ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $55,000) 28 (62) SR 0879 OVER LICK RUN, GOSHEN 29 TOWNSHIP, BRIDGE REPLACEMENT 229,000 30 (BASE PROJECT ALLOCATION - $139,000) 20080S1503B2474 - 125 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $70,000) 3 (63) SR 0969 OVER BELL RUN, GREENWOOD 4 TOWNSHIP, BRIDGE REPLACEMENT 647,000 5 (BASE PROJECT ALLOCATION - $418,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $209,000) 8 (64) SR 1001 OVER WEST BRANCH OF 9 SUSQUEHANNA RIVER, LAWRENCE TOWNSHIP, 10 BRIDGE REPLACEMENT 1,724,000 11 (BASE PROJECT ALLOCATION - $1,136,000) 12 (LAND ALLOCATION - $20,000) 13 (DESIGN AND CONTINGENCIES - $568,000) 14 (65) SR 1004 OVER MONTGOMERY RUN, LAWRENCE 15 TOWNSHIP, BRIDGE REPLACEMENT 164,000 16 (BASE PROJECT ALLOCATION - $96,000) 17 (LAND ALLOCATION - $20,000) 18 (DESIGN AND CONTINGENCIES - $48,000) 19 (66) SR 1008 OVER TROUT RUN, GOSHEN 20 TOWNSHIP, BRIDGE REPLACEMENT 127,000 21 (BASE PROJECT ALLOCATION - $71,000) 22 (LAND ALLOCATION - $20,000) 23 (DESIGN AND CONTINGENCIES - $36,000) 24 (67) SR 1011 OVER WEST BRANCH OF 25 SUSQUEHANNA RIVER, COOPER TOWNSHIP, 26 BRIDGE REHABILITATION 2,909,000 27 (BASE PROJECT ALLOCATION - $1,926,000) 28 (LAND ALLOCATION - $20,000) 29 (DESIGN AND CONTINGENCIES - $963,000) 30 (68) SR 1011 OVER MOSQUITO CREEK, KARTHAUS 20080S1503B2474 - 126 -
1 TOWNSHIP, BRIDGE REHABILITATION 991,000 2 (BASE PROJECT ALLOCATION - $741,000) 3 (LAND ALLOCATION - $100,000) 4 (DESIGN AND CONTINGENCIES - $150,000) 5 (69) SR 2009 OVER ALEXANDER RUN, BIGLER 6 TOWNSHIP, BRIDGE REPLACEMENT 76,000 7 (BASE PROJECT ALLOCATION - $37,000) 8 (LAND ALLOCATION - $20,000) 9 (DESIGN AND CONTINGENCIES - $19,000) 10 (70) SR 2013 OVER BEAVER RUN, WOODWARD 11 TOWNSHIP, BRIDGE REPLACEMENT 104,000 12 (BASE PROJECT ALLOCATION - $56,000) 13 (LAND ALLOCATION - $20,000) 14 (DESIGN AND CONTINGENCIES - $28,000) 15 (71) SR 2015 OVER PORTER RUN, BIGLER 16 TOWNSHIP, BRIDGE REPLACEMENT 86,000 17 (BASE PROJECT ALLOCATION - $44,000) 18 (LAND ALLOCATION - $20,000) 19 (DESIGN AND CONTINGENCIES - $22,000) 20 (72) SR 2023 OVER LITTLE CLEARFIELD CREEK, 21 KNOX TOWNSHIP, BRIDGE REPLACEMENT 254,000 22 (BASE PROJECT ALLOCATION - $156,000) 23 (LAND ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $78,000) 25 (73) SR 2023 OVER MITCHELL RUN, LAWRENCE 26 TOWNSHIP, BRIDGE REPLACEMENT 51,000 27 (BASE PROJECT ALLOCATION - $21,000) 28 (LAND ALLOCATION - $20,000) 29 (DESIGN AND CONTINGENCIES - $10,000) 30 (74) SR 2024 OVER TRIBUTARY OF CLEARFIELD 20080S1503B2474 - 127 -
1 CREEK, BOGGS TOWNSHIP, BRIDGE 2 REPLACEMENT 37,000 3 (BASE PROJECT ALLOCATION - $11,000) 4 (LAND ALLOCATION - $20,000) 5 (DESIGN AND CONTINGENCIES - $6,000) 6 (75) SR 2024 OVER DIMELING RUN, BOGGS 7 TOWNSHIP, BRIDGE REPLACEMENT 53,000 8 (BASE PROJECT ALLOCATION - $22,000) 9 (LAND ALLOCATION - $20,000) 10 (DESIGN AND CONTINGENCIES - $11,000) 11 (76) SR 2024 OVER RAILS TO TRAILS, PIKE 12 TOWNSHIP, BRIDGE REHABILITATION 415,000 13 (BASE PROJECT ALLOCATION - $263,000) 14 (LAND ALLOCATION - $20,000) 15 (DESIGN AND CONTINGENCIES - $132,000) 16 (77) SR 2029 OVER LAUREL RUN, BOGGS 17 TOWNSHIP, BRIDGE REPLACEMENT 83,000 18 (BASE PROJECT ALLOCATION - $42,000) 19 (LAND ALLOCATION - $20,000) 20 (DESIGN AND CONTINGENCIES - $21,000) 21 (78) SR 2030 OVER ALDER RUN, GRAHAM 22 TOWNSHIP, BRIDGE REPLACEMENT 128,000 23 (BASE PROJECT ALLOCATION - $72,000) 24 (LAND ALLOCATION - $20,000) 25 (DESIGN AND CONTINGENCIES - $36,000) 26 (79) SR 2032 OVER MORAVIAN RUN, GRAHAM 27 TOWNSHIP, BRIDGE REPLACEMENT 53,000 28 (BASE PROJECT ALLOCATION - $22,000) 29 (LAND ALLOCATION - $20,000) 30 (DESIGN AND CONTINGENCIES - $11,000) 20080S1503B2474 - 128 -
1 (80) SR 2034 OVER LAUREL RUN, WALLACETON 2 BOROUGH, BRIDGE REPLACEMENT 62,000 3 (BASE PROJECT ALLOCATION - $28,000) 4 (LAND ALLOCATION - $20,000) 5 (DESIGN AND CONTINGENCIES - $14,000) 6 (81) SR 2039 OVER BROWNS RUN, COOPER 7 TOWNSHIP, BRIDGE REPLACEMENT 46,000 8 (BASE PROJECT ALLOCATION - $17,000) 9 (LAND ALLOCATION - $20,000) 10 (DESIGN AND CONTINGENCIES - $9,000) 11 (82) SR 3003 OVER BARRETT RUN, FERGUSON 12 TOWNSHIP, BRIDGE REPLACEMENT 97,000 13 (BASE PROJECT ALLOCATION - $51,000) 14 (LAND ALLOCATION - $20,000) 15 (DESIGN AND CONTINGENCIES - $26,000) 16 (83) SR 3003 OVER WOODS RUN, FERGUSON 17 TOWNSHIP, BRIDGE REPLACEMENT 56,000 18 (BASE PROJECT ALLOCATION - $24,000) 19 (LAND ALLOCATION - $20,000) 20 (DESIGN AND CONTINGENCIES - $12,000) 21 (84) SR 3009 OVER EAST BRANCH OF MAHONING 22 CREEK, BRADY TOWNSHIP, BRIDGE 23 REPLACEMENT 170,000 24 (BASE PROJECT ALLOCATION - $100,000) 25 (LAND ALLOCATION - $20,000) 26 (DESIGN AND CONTINGENCIES - $50,000) 27 (85) SR 3014 OVER PATCHIN RUN, BURNSIDE 28 TOWNSHIP, BRIDGE REPLACEMENT 91,000 29 (BASE PROJECT ALLOCATION - $47,000) 30 (LAND ALLOCATION - $20,000) 20080S1503B2474 - 129 -
1 (DESIGN AND CONTINGENCIES - $24,000) 2 (86) SR 3014 OVER SNYDER RUN, CHEST 3 TOWNSHIP, BRIDGE REPLACEMENT 56,000 4 (BASE PROJECT ALLOCATION - $24,000) 5 (LAND ALLOCATION - $20,000) 6 (DESIGN AND CONTINGENCIES - $12,000) 7 (87) SR 3016 OVER LITTLE DEER RUN, NEW 8 WASHINGTON BOROUGH, BRIDGE REPLACEMENT 328,000 9 (BASE PROJECT ALLOCATION - $140,000) 10 (LAND ALLOCATION - $100,000) 11 (DESIGN AND CONTINGENCIES - $88,000) 12 (88) SR 3017 OVER BRANCH OF BEAVER RUN, 13 BURNSIDE TOWNSHIP, BRIDGE REPLACEMENT 133,000 14 (BASE PROJECT ALLOCATION - $75,000) 15 (LAND ALLOCATION - $20,000) 16 (DESIGN AND CONTINGENCIES - $38,000) 17 (89) SR 4001 OVER KUNTZ RUN, BRADY 18 TOWNSHIP, BRIDGE REPLACEMENT 52,000 19 (BASE PROJECT ALLOCATION - $21,000) 20 (LAND ALLOCATION - $20,000) 21 (DESIGN AND CONTINGENCIES - $11,000) 22 (90) SR 4003 OVER STUMP CREEK, BRADY 23 TOWNSHIP, BRIDGE REPLACEMENT 59,000 24 (BASE PROJECT ALLOCATION - $26,000) 25 (LAND ALLOCATION - $20,000) 26 (DESIGN AND CONTINGENCIES - $13,000) 27 (91) SR 4013 OVER DRESSLER RUN, UNION 28 TOWNSHIP, BRIDGE REPLACEMENT 88,000 29 (BASE PROJECT ALLOCATION - $45,800) 30 (LAND ALLOCATION - $20,000) 20080S1503B2474 - 130 -
1 (DESIGN AND CONTINGENCIES - $23,000) 2 (92) SR 4015 OVER I-80, SANDY TOWNSHIP, 3 BRIDGE REPLACEMENT 1,658,000 4 (BASE PROJECT ALLOCATION - $1,092,000) 5 (LAND ALLOCATION - $20,000) 6 (DESIGN AND CONTINGENCIES - $546,000) 7 (93) SR 4017 OVER SANDY LICK CREEK, SANDY 8 TOWNSHIP, BRIDGE REPLACEMENT 383,000 9 (BASE PROJECT ALLOCATION - $242,000) 10 (LAND ALLOCATION - $20,000) 11 (DESIGN AND CONTINGENCIES - $121,000) 12 Section 22. Clinton County. 13 (a) Local Bridges (Reserved) 14 (b) State Bridges 15 (1) SR 0477 over Dry Run, Lamar Township, 16 Bridge Replacement 1,150,000 17 (Base Project Allocation - $750,000) 18 (Land Allocation - $200,000) 19 (Design and Contingencies - $200,000) 20 (2) SR 4001 over Beaver Dam Run, Leidy 21 Township, Bridge Replacement 1,100,000 22 (Base Project Allocation - $750,000) 23 (Land Allocation - $100,000) 24 (Design and Contingencies - $250,000) 25 (3) SR 4001 over Walters Run, Leidy 26 Township, Bridge Replacement 900,000 27 (Base Project Allocation - $500,000) 28 (Land Allocation - $200,000) 29 (Design and Contingencies - $200,000) 30 (4) SR 0880 over Spangler Run, Logan 20080S1503B2474 - 131 -
1 Township, Bridge Replacement 225,000 2 (Base Project Allocation - $150,000) 3 (Design and Contingencies - $75,000) 4 (5) SR 2002 over Spangler Run, Logan 5 Township, Bridge Replacement 300,000 6 (Base Project Allocation - $200,000) 7 (Design and Contingencies - $100,000) 8 (6) SR 0144 over Halls Run, Noyes 9 Township, Bridge Replacement 250,000 10 (Base Project Allocation - $150,000) 11 (Land Allocation - $100,000) 12 (7) SR 0064 over Big Fishing Creek, Porter 13 Township, Bridge Replacement 4,200,000 14 (Base Project Allocation - $3,300,000) 15 (Land Allocation - $300,000) 16 (Design and Contingencies - $600,000) 17 (8) SR 2004 over Fishing Creek, Porter 18 Township, Bridge Rehabilitation 1,050,000 19 (Base Project Allocation - $500,000) 20 (Land Allocation - $100,000) 21 (Design and Contingencies - $450,000) 22 (9) SR 0120 OVER BIG FISHING CREEK, PORTER <-- 23 TOWNSHIP, BRIDGE REPLACEMENT 1,750,000 24 (BASE PROJECT ALLOCATION - $1,250,000) 25 (LAND ALLOCATION - $100,000) 26 (DESIGN AND CONTINGENCIES - $400,000) 27 (10) SR 0144 OVER HAMMERSLEY FORK, LEIDY 28 TOWNSHIP, BRIDGE REHABILITATION 938,000 29 (BASE PROJECT ALLOCATION - $838,000) 30 (LAND ALLOCATION - $100,000) 20080S1503B2474 - 132 -
1 (11) SR 0150 OVER HOLLENBACK RUN, BEECH 2 CREEK TOWNSHIP, BRIDGE REPLACEMENT 92,000 3 (BASE PROJECT ALLOCATION - $48,000) 4 (LAND ALLOCATION - $20,000) 5 (DESIGN AND CONTINGENCIES - $24,000) 6 (12) SR 0150 OVER CHATHAM RUN, DUNNSTABLE 7 TOWNSHIP, BRIDGE REPLACEMENT 92,000 8 (BASE PROJECT ALLOCATION - $48,000) 9 (LAND ALLOCATION - $20,000) 10 (DESIGN AND CONTINGENCIES - $24,000) 11 (13) SR 0477 OVER MILL RACE, LAMAR 12 TOWNSHIP, BRIDGE REPLACEMENT 58,000 13 (BASE PROJECT ALLOCATION - $30,000) 14 (LAND ALLOCATION - $20,000) 15 (DESIGN AND CONTINGENCIES - $8,000) 16 (14) SR 0880 OVER SPANGLERS RUN, LOGAN 17 TOWNSHIP, BRIDGE REPLACEMENT 353,000 18 (BASE PROJECT ALLOCATION - $172,000) 19 (LAND ALLOCATION - $100,000) 20 (DESIGN AND CONTINGENCIES - $81,000) 21 (15) SR 0880, BRIDGE NO.12266 OVER 22 RAUCHTOWN CREEK, CRAWFORD TOWNSHIP, 23 BRIDGE REPLACEMENT 80,000 24 (BASE PROJECT ALLOCATION - $40,000) 25 (LAND ALLOCATION - $20,000) 26 (DESIGN AND CONTINGENCIES - $20,000) 27 (16) SR 0880, BRIDGE NO.12268 OVER 28 RAUCHTOWN CREEK, CRAWFORD TOWNSHIP, 29 BRIDGE REPLACEMENT 152,000 30 (BASE PROJECT ALLOCATION - $88,000) 20080S1503B2474 - 133 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $44,000) 3 (17) SR 4001 OVER WALTERS RUN, LEIDY 4 TOWNSHIP, BRIDGE REPLACEMENT 340,000 5 (BASE PROJECT ALLOCATION - $140,000) 6 (LAND ALLOCATION - $100,000) 7 (DESIGN AND CONTINGENCIES - $100,000) 8 (18) SR 0064 OVER CEDAR RUN, LAMAR 9 TOWNSHIP, REHABILITATION 928,000 10 (BASE PROJECT ALLOCATION - $878,000) 11 (LAND ALLOCATION - $50,000) 12 (19) SR 0220, BRIDGE NO.12190 OVER FISHING 13 CREEK, LAMAR TOWNSHIP, BRIDGE 14 REHABILITATION 200,000 15 (BASE PROJECT ALLOCATION - $200,000) 16 (20) SR 0220, BRIDGE NO.12191 OVER FISHING 17 CREEK, LAMAR TOWNSHIP, BRIDGE 18 REHABILITATION 200,000 19 (BASE PROJECT ALLOCATION - $200,000) 20 (21) SR 1005 OVER T-425 AND T-565, WAYNE 21 TOWNSHIP, BRIDGE REHABILITATION 994,000 22 (BASE PROJECT ALLOCATION - $894,000) 23 (LAND ALLOCATION - $100,000) 24 (22) SR 2008 OVER FISHING CREEK, LAMAR 25 TOWNSHIP, BRIDGE REHABILITATION 1,039,000 26 (BASE PROJECT ALLOCATION - $939,000) 27 (LAND ALLOCATION - $100,000) 28 (23) SR 2015, BRIDGE NO.12342 OVER SR 29 0220, BALD EAGLE TOWNSHIP, BRIDGE 30 REHABILITATION 200,000 20080S1503B2474 - 134 -
1 (BASE PROJECT ALLOCATION - $200,000) 2 (24) SR 2015, BRIDGE NO.12343 OVER SR 3 0220, BALD EAGLE TOWNSHIP, BRIDGE 4 REHABILITATION 200,000 5 (BASE PROJECT ALLOCATION - $200,000) 6 Section 23. Columbia County. 7 (a) Local Bridges (Reserved) 8 (b) State Bridges 9 (1) SR 0042 over Catawissa Creek, 10 Catawissa Borough, Bridge Replacement 1,240,000 11 (Base Project Allocation - $1,100,000) 12 (Land Allocation - $40,000) 13 (Design and Contingencies - $100,000) 14 (2) SR 0042 over Roaring Creek, Catawissa 15 Township, Bridge Replacement 230,000 16 (Base Project Allocation - $180,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $40,000) 19 (3) SR 3003 over Roaring Creek, Cleveland 20 Township, Bridge Replacement 172,000 21 (Base Project Allocation - $160,000) 22 (Design and Contingencies - $12,000) 23 (4) SR 3008 over Mugser Run, Cleveland 24 Township, Bridge Replacement 145,000 25 (Base Project Allocation - $100,000) 26 (Land Allocation - $15,000) 27 (Design and Contingencies - $30,000) 28 (5) SR 1020 over Huntington Creek, Fishing 29 Creek Township, Bridge Rehabilitation 250,000 30 (Base Project Allocation - $200,000) 20080S1503B2474 - 135 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $40,000) 3 (6) SR 1020 over Pine Creek, Fishing Creek 4 Township, Bridge Rehabilitation 196,000 5 (Base Project Allocation - $180,000) 6 (Design and Contingencies - $16,000) 7 (7) SR 1020 over Fishing Creek, Fishing 8 Creek Township, Bridge Rehabilitation 150,000 9 (Base Project Allocation - $120,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $20,000) 12 (8) SR 0254 over Tributary of Mud Run, 13 Greenwood Township, Bridge Replacement 160,000 14 (Base Project Allocation - $130,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $20,000) 17 (9) SR 4004 over Hemlock Creek, Hemlock 18 Township, Bridge Rehabilitation 754,000 19 (Base Project Allocation - $693,000) 20 (Design and Contingencies - $61,000) 21 (10) SR 2014 over Roaring Creek, Locust 22 Township, Bridge Rehabilitation 323,000 23 (Base Project Allocation - $261,000) 24 (Design and Contingencies - $62,000) 25 (11) SR 0487 over Tributary of Fishing 26 Creek, Orangeville Borough, Bridge 27 Replacement 100,000 28 (Base Project Allocation - $100,000) 29 (12) SR 0487, 1 MILE NORTH OF BENTON OVER <-- 30 FISHING CREEK, BENTON TOWNSHIP, BRIDGE 20080S1503B2474 - 136 -
1 REHABILITATION 194,000 2 (BASE PROJECT ALLOCATION - $186,000) 3 (DESIGN AND CONTINGENCIES - $8,000) 4 (13) SR 0339, 2.25 MILES WEST OF 5 SHUMANTOWN OVER CATAWISSA CREEK, BEAVER 6 TOWNSHIP, BRIDGE REHABILITATION 194,000 7 (BASE PROJECT ALLOCATION - $186,000) 8 (DESIGN AND CONTINGENCIES - $8,000) 9 Section 24. Crawford County. 10 (a) Local Bridges (Reserved) 11 (b) State Bridges 12 (1) SR 0008, William Flinn over South 13 Branch of Hollow Run, Bloomfield 14 Township, Bridge Rehabilitation 48,000 15 (Base Project Allocation - $48,000) 16 (2) SR 0006 over French Creek, Cambridge 17 Township, Bridge Rehabilitation 190,000 18 (Base Project Allocation - $160,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $20,000) 21 (3) SR 1016 over Tributary of French 22 Creek, Cambridge Township, Bridge 23 Rehabilitation 48,000 24 (Base Project Allocation - $48,000) 25 (4) SR 0008 over Oil Creek, City of 26 Titusville, Bridge Rehabilitation 800,000 27 (Base Project Allocation - $700,000) 28 (Design and Contingencies - $100,000) 29 (5) SR 4001 over Tributary of Paden Creek, 30 Conneaut Township, Bridge Replacement 200,000 20080S1503B2474 - 137 -
1 (Base Project Allocation - $200,000) 2 (6) SR 4010, West Road over Cussewago 3 Creek, Cussewago Township, Bridge 4 Rehabilitation 48,000 5 (Base Project Allocation - $48,000) 6 (7) SR 0098, Cussewago Road over Tributary 7 of Cussewago Creek, Cussewago Township, 8 Bridge Replacement 138,000 9 (Base Project Allocation - $138,000) 10 (8) SR 2007, Pettis Road over Tributary of 11 Little Sugar Creek, East Fairfield 12 Township, Bridge Replacement 130,000 13 (Base Project Allocation - $130,000) 14 (9) SR 3019, Lake Road over Little Sandy 15 Creek, Greenwood Township, Bridge 16 Rehabilitation 40,000 17 (Base Project Allocation - $40,000) 18 (10) SR 3019, Lake Road over Armour Run, 19 Greenwood Township, Bridge 20 Rehabilitation 40,000 21 (Base Project Allocation - $40,000) 22 (11) SR 0408, Thompson Street over Oil 23 Creek, Hydetown Borough, Bridge 24 Rehabilitation 61,000 25 (Base Project Allocation - $61,000) 26 (12) SR 0027, Plank Road over Pine Creek, 27 Oil Creek Township, Bridge 28 Rehabilitation 70,000 29 (Base Project Allocation - $70,000) 30 (13) SR 0408 over Tributary of Muddy 20080S1503B2474 - 138 -
1 Creek, Richmond Township, Bridge 2 Replacement 180,000 3 (Base Project Allocation - $180,000) 4 (14) SR 0077, State Street over Tributary 5 of Woodcock Creek, Richmond Township, 6 Bridge Rehabilitation 20,000 7 (Base Project Allocation - $20,000) 8 (15) SR 1014 over Muddy Creek, Rockdale 9 Township, Bridge Rehabilitation 33,000 10 (Base Project Allocation - $33,000) 11 (16) SR 1035 over Tributary of Muddy 12 Creek, Rockdale Township, Bridge 13 Rehabilitation 114,000 14 (Base Project Allocation - $84,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $20,000) 17 (17) SR 0408, Church Street over Mohawk 18 Run, Rockdale Township, Bridge 19 Rehabilitation 17,000 20 (Base Project Allocation - $17,000) 21 (18) SR 0006 over Conneaut Lake Outlet, 22 Sadsbury Township, Bridge Replacement 800,000 23 (Base Project Allocation - $700,000) 24 (Design and Contingencies - $100,000) 25 (19) SR 0285 over Adsit Run, Sadsbury 26 Township, Bridge Rehabilitation 550,000 27 (Base Project Allocation - $400,000) 28 (Design and Contingencies - $150,000) 29 (20) SR 1001 over Woodcock Creek, 30 Saegertown Borough, Bridge 20080S1503B2474 - 139 -
1 Rehabilitation 600,000 2 (Base Project Allocation - $500,000) 3 (Design and Contingencies - $100,000) 4 (21) SR 0018, Springboro Road over 5 Tributary of Conneaut Creek, Spring 6 Township, Bridge Replacement 138,000 7 (Base Project Allocation - $138,000) 8 (22) SR 4010 over Carr Run, Spring 9 Township, Bridge Replacement 140,000 10 (Base Project Allocation - $80,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $50,000) 13 (23) SR 0408, Church Street Bridge 14 No.13126 over Wet Weather Stream, Troy 15 Township, Bridge Replacement 111,000 16 (Base Project Allocation - $111,000) 17 (24) SR 2014, Sugar Lake over Brown Run, 18 Wayne Township, Bridge Rehabilitation 17,000 19 (Base Project Allocation - $17,000) 20 (25) SR 3011, Hartstown Road over Klink 21 Run, West Fallowfield Township, Bridge 22 Replacement 130,000 23 (Base Project Allocation - $130,000) 24 (26) SR 2012, Alden Street over Mill Run, 25 West Mead Township, Bridge Replacement 157,000 26 (Base Project Allocation - $157,000) 27 Section 25. Cumberland County. 28 (a) Local Bridges 29 (1) South Middleton Township, Zion Road 30 over Yellow Breeches Creek, Bridge 20080S1503B2474 - 140 -
1 Replacement 2,500,000 2 (Base Project Allocation - $2,500,000) 3 (2) Middlesex Township, Wolf Bridge Road 4 over Conodoguinet Creek, Bridge 5 Replacement 2,800,000 6 (Base Project Allocation - $2,800,000) 7 (b) State Bridges 8 (1) SR 2002, East North Street over Letort 9 Spring Run, Carlisle Borough, Bridge 10 Rehabilitation 1,460,000 11 (Base Project Allocation - $650,000) 12 (Design and Contingencies - $810,000) 13 (2) SR 3021, Burnthouse Road over Yellow 14 Breeches Creek, Dickinson Township, 15 Bridge Replacement 3,320,000 16 (Base Project Allocation - $1,660,000) 17 (Design and Contingencies - $1,660,000) 18 (3) SR 3010, Goodyear Road over Hunters 19 Run, Dickinson Township, Bridge 20 Rehabilitation 500,000 21 (Base Project Allocation - $500,000) 22 (4) SR 2025, Slate Hill Road over SR 0015, 23 Lower Allen Township, Bridge 24 Rehabilitation 3,970,000 25 (Base Project Allocation - $1,850,000) 26 (Design and Contingencies - $2,120,000) 27 (5) PA 641 over Big Spring Creek, Newville 28 Borough, Bridge Rehabilitation 1,400,000 29 (Base Project Allocation - $1,400,000) 30 (6) SR 3005 over Green Spring Creek, North 20080S1503B2474 - 141 -
1 Newton Township, Bridge Replacement 952,000 2 (Base Project Allocation - $631,000) 3 (Land Allocation - $40,000) 4 (Design and Contingencies - $281,000) 5 (7) SR 4007 over Conodoguinet Creek, North 6 Newton Township, Bridge Rehabilitation 1,207,000 7 (Base Project Allocation - $1,000,000) 8 (Land Allocation - $20,000) 9 (Design and Contingencies - $187,000) 10 (8) SR 3006 over Tributary of Yellow 11 Breeches Creek, Penn Township, Bridge 12 Replacement 726,000 13 (Base Project Allocation - $419,000) 14 (Land Allocation - $40,000) 15 (Design and Contingencies - $267,000) 16 (9) I-81 Southbound over Conodoguinet 17 Creek, Silver Spring Township, Bridge 18 Rehabilitation 9,000,000 19 (Base Project Allocation - $9,000,000) 20 (10) I-81 Southbound over Letort Spring 21 Run, Abandoned Railroad, South 22 Middleton Township, Bridge 23 Rehabilitation 7,500,000 24 (Base Project Allocation - $7,500,000) 25 (11) SR 2003 over Yellow Breeches Creek, 26 South Middleton Township, Bridge 27 Rehabilitation 3,000,000 28 (Base Project Allocation - $3,000,000) 29 (12) SR 3007, Stoughstown over Yellow 30 Breeches Creek, South Newton Township, 20080S1503B2474 - 142 -
1 Bridge Rehabilitation 750,000 2 (Base Project Allocation - $750,000) 3 (13) SR 1027 over Tributary of Susquehanna 4 River, Wormleysburg Borough, Bridge 5 Replacement 138,000 6 (Land Allocation - $13,000) 7 (Design and Contingencies - $125,000) 8 (14) SR 0011, US 11 over Tributary of 9 Susquehanna River, Wormleysburg 10 Borough, Bridge Replacement 138,000 11 (Land Allocation - $13,000) 12 (Design and Contingencies - $125,000) 13 (15) SR 0015, US 15, US 15 AND PA 144 <-- 14 INTERCHANGE OVER SR 0114, PA 114, UPPER 15 ALLEN TOWNSHIP, BRIDGE REHABILITATION 265,000 16 (DESIGN AND CONTINGENCIES - $265,000) 17 Section 26. Dauphin County. 18 (a) Local Bridges 19 (1) Derry Township, SR 0743 over Norfolk 20 Southern Railroad, Bridge Replacement 10,673,000 21 (Base Project Allocation - $8,455,000) 22 (Land Allocation - $760,000) 23 (Design and Contingencies - $300,000) 24 (2) Derry Township, Park Boulevard over 25 Spring Creek, Bridge Replacement 1,400,000 26 (Base Project Allocation - $1,000,000) 27 (Land Allocation - $100,000) 28 (Design and Contingencies - $300,000) 29 (3) Derry Township, Norfolk-Southern 30 Railroad Bridge over Ridge Road, Bridge 20080S1503B2474 - 143 -
1 Replacement 2,600,000 2 (Base Project Allocation - $2,000,000) 3 (Land Allocation - $100,000) 4 (Design and Contingencies - $500,000) 5 (4) City of Harrisburg, Walnut Street 6 Bridge over Susquehanna River, Bridge 7 Replacement 6,600,000 8 (Base Project Allocation - $5,000,000) 9 (Land Allocation - $100,000) 10 (Design and Contingencies - $1,500,000) 11 (5) SWATARA TOWNSHIP, BETWEEN GRAYSON ROAD <-- 12 AND PA 3012 DERRY STREET BRIDGE OVER 13 RAILROAD TRACKS, BRIDGE REHABILITATION 16,700,000 14 (BASE PROJECT ALLOCATION - $16,700,000) 15 (b) State Bridges 16 (1) SR 0022 over Manada Creek, East 17 Hanover Township, Bridge Replacement 4,500,000 18 (Base Project Allocation - $4,500,000) 19 (2) PA 230 over Conewago Creek, 20 Londonderry Township, Bridge 21 Rehabilitation 4,335,000 22 (Base Project Allocation - $2,025,000) 23 (Design and Contingencies - $2,310,000) 24 (3) SR 0443, Fishing Creek Road over 25 Fishing Creek, Middle Paxton Township, 26 Bridge Rehabilitation 3,630,000 27 (Base Project Allocation - $1,680,000) 28 (Design and Contingencies - $1,950,000) 29 (4) SR 0025, PA 25 over Tributary of 30 Wiconisco Creek, Mifflin Township, 20080S1503B2474 - 144 -
1 Bridge Replacement 699,000 2 (Base Project Allocation - $479,000) 3 (Land Allocation - $40,000) 4 (Design and Contingencies - $180,000) 5 (5) SR 2010, East Canal Street over Manada 6 Creek, South Hanover Township, Bridge 7 Rehabilitation 2,895,000 8 (Base Project Allocation - $1,305,000) 9 (Design and Contingencies - $1,590,000) 10 (6) SR 2003 over Swatara Creek, South 11 Hanover Township, Bridge 12 Rehabilitation 1,057,000 13 (Base Project Allocation - $800,000) 14 (Land Allocation - $30,000) 15 (Design and Contingencies - $227,000) 16 (7) SR 3006, Chambers Hill Road over SR 17 0283 and SR 3001, Swatara Township, 18 Bridge Rehabilitation 2,850,000 19 (Base Project Allocation - $2,570,000) 20 (Land Allocation - $30,000) 21 (Design and Contingencies - $250,000) 22 (8) PA 147 over Wiconisco Creek, Upper 23 Paxton Township, Bridge Rehabilitation 3,630,000 24 (Base Project Allocation - $1,680,000) 25 (Design and Contingencies - $1,950,000) 26 (9) SR 4009, Wiconisco Street over Little 27 Wiconisco Creek, Upper Paxton Township, 28 Bridge Rehabilitation 1,090,000 29 (Base Project Allocation - $490,000) 30 (Design and Contingencies - $600,000) 20080S1503B2474 - 145 -
1 (10) SR 4009, Wiconisco Street over 2 Wiconisco Creek, Upper Paxton Township, 3 Bridge Rehabilitation 1,090,000 4 (Base Project Allocation - $490,000) 5 (Design and Contingencies - $600,000) 6 (11) SR 1006, Rakers Mill Road over 7 Wiconisco Creek, Washington Township, 8 Bridge Rehabilitation 3,135,000 9 (Base Project Allocation - $1,425,000) 10 (Design and Contingencies - $1,710,000) 11 (12) SR 0443, PA 443 over Tributary of 12 Fishing Creek, West Hanover Township, 13 Bridge Replacement 100,000 14 (Base Project Allocation - $100,000) 15 (13) US 22/322, CLARKS FERRY BRIDGE OVER <-- 16 SUSQUEHANNA RIVER, REED TOWNSHIP, 17 PARAPET REHABILITATION 2,250,000 18 (BASE PROJECT ALLOCATION - $2,000,000) 19 (DESIGN AND CONTINGENCIES - $250,000) 20 (14) US 22/322, CLARKS FERRY BRIDGE OVER 21 SR 0147 SOUTHBOUND RAMP AND SUSQUEHANNA 22 RIVER, REED TOWNSHIP, PARAPET 23 REHABILITATION 2,250,000 24 (BASE PROJECT ALLOCATION - $2,000,000) 25 (DESIGN AND CONTINGENCIES - $250,000) 26 (15) SR 0441, PA 441, 2 MILES NORTH OF 27 HIGHSPIRE OVER I-283, SR 0283, SWATARA 28 TOWNSHIP, BRIDGE REHABILITATION 1,880,000 29 (BASE PROJECT ALLOCATION - $1,880,000) 30 (16) SR 2012, LAUDERMILCH ROAD OVER 20080S1503B2474 - 146 -
1 RAILROAD TRACKS, DERRY TOWNSHIP, BRIDGE 2 REPLACEMENT 12,500,000 3 (BASE PROJECT ALLOCATION - $12,500,000) 4 Section 27. Delaware County. 5 (a) Local Bridges 6 (1) Newtown Township, T-640, SR 7208 over 7 Hunter Creek, Bridge Replacement 560,000 8 (Base Project Allocation - $560,000) 9 (2) MEDIA BOROUGH, THIRD STREET OVER <-- 10 BROOMALL LAKE DAM, BRIDGE 11 REHABILITATION 888,000 12 (BASE PROJECT ALLOCATION - $888,000) 13 (3) FOLCROFT BOROUGH, TRIBBETT AVENUE 14 BRIDGE OVER HERMASPROTA CREEK, BRIDGE 15 REHABILITATION OR REPLACEMENT 2,050,000 16 (BASE PROJECT ALLOCATION - $1,500,000) 17 (LAND ALLOCATION - $50,000) 18 (DESIGN AND CONTINGENCIES - $500,000) 19 (b) State Bridges 20 (1) SR 3007, Concord Road over Baldwin 21 Run, Chester Township, Bridge 22 Rehabilitation 63,000 23 (Base Project Allocation - $11,000) 24 (Land Allocation - $1,000) 25 (Design and Contingencies - $51,000) 26 (2) SR 2006, Macdade Boulevard over Ridley 27 Creek, Chester Township, Bridge 28 Rehabilitation 63,000 29 (Base Project Allocation - $11,000) 30 (Land Allocation - $1,000) 20080S1503B2474 - 147 -
1 (Design and Contingencies - $51,000) 2 (3) SR 3046 over Webb Creek, Concord 3 Township, Bridge Replacement 2,500,000 4 (Base Project Allocation - $691,000) 5 (Land Allocation - $60,000) 6 (Design and Contingencies - $1,749,000) 7 (4) SR 2006, Macdade Boulevard over 8 Munckinipattus Creek, Glenolden 9 Borough, Bridge Rehabilitation 1,389,000 10 (Base Project Allocation - $96,000) 11 (Land Allocation - $31,000) 12 (Design and Contingencies - $1,262,000) 13 (5) SR 1018, Ardmore Avenue over Cobbs 14 Creek, Haverford Township, Bridge 15 Rehabilitation 63,000 16 (Base Project Allocation - $11,000) 17 (Land Allocation - $1,000) 18 (Design and Contingencies - $51,000) 19 (6) SR 1026, College Avenue over Cobbs 20 Creek, Haverford Township, Bridge 21 Replacement 3,353,000 22 (Base Project Allocation - $2,184,000) 23 (Land Allocation - $600,000) 24 (Design and Contingencies - $569,000) 25 (7) SR 1026, College Avenue over SEPTA 26 P&W, Haverford Township, Bridge 27 Rehabilitation 4,500,000 28 (Base Project Allocation - $1,150,000) 29 (Land Allocation - $200,000) 30 (Design and Contingencies - $3,150,000) 20080S1503B2474 - 148 -
1 (8) SR 0003, West Chester Pike over Mid- 2 County Expressway, Ramp, Marple 3 Township, Bridge Rehabilitation 63,000 4 (Base Project Allocation - $11,000) 5 (Land Allocation - $1,000) 6 (Design and Contingencies - $51,000) 7 (9) SR 3015, Creek Road over Branch of 8 Chester Creek, Middletown Township, 9 Bridge Rehabilitation 63,000 10 (Base Project Allocation - $11,000) 11 (Land Allocation - $1,000) 12 (Design and Contingencies - $51,000) 13 (10) SR 3019, Manchester Avenue over 14 SEPTA, Nether Providence Township, 15 Bridge Rehabilitation 63,000 16 (Base Project Allocation - $11,000) 17 (Land Allocation - $1,000) 18 (Design and Contingencies - $51,000) 19 (11) SR 1015, Darby Paoli Road over Little 20 Darby Creek, Radnor Township, Bridge 21 Rehabilitation 63,000 22 (Base Project Allocation - $11,000) 23 (Land Allocation - $1,000) 24 (Design and Contingencies - $51,000) 25 (12) SR 1034, Goshen Road over Darby 26 Creek, Radnor Township, Bridge 27 Rehabilitation 63,000 28 (Base Project Allocation - $11,000) 29 (Land Allocation - $1,000) 30 (Design and Contingencies - $51,000) 20080S1503B2474 - 149 -
1 (13) SR 0322, Conchester Highway over CSX 2 Railroad, Upper Chichester Township, 3 Bridge Rehabilitation 63,000 4 (Base Project Allocation - $11,000) 5 (Land Allocation - $1,000) 6 (Design and Contingencies - $51,000) 7 (14) SR 2019, Bishop Avenue over Darby 8 Creek, Upper Darby Township, Bridge 9 Rehabilitation 63,000 10 (Base Project Allocation - $11,000) 11 (Land Allocation - $1,000) 12 (Design and Contingencies - $51,000) 13 (15) SR 2026, State Road over Cobbs Creek, 14 Upper Darby Township, Bridge 15 Rehabilitation 1,389,000 16 (Base Project Allocation - $96,000) 17 (Land Allocation - $31,000) 18 (Design and Contingencies - $1,262,000) 19 Section 28. Elk County. 20 (a) Local Bridges 21 (1) Jones Township, T-368 over West Branch 22 of Clarion River, Bridge Replacement 755,000 23 (Base Project Allocation - $500,000) 24 (Land Allocation - $5,000) 25 (Design and Contingencies - $250,000) 26 (2) Benezette Township, T-426 over 27 Benezette Branch of Sinnemahoning 28 Creek, Bridge Replacement 5,000,000 29 (Base Project Allocation - $5,000,000) 30 (3) Jay Township, T-464 over Bennet Branch 20080S1503B2474 - 150 -
1 of Sinnemahoning Creek, Bridge 2 Replacement 2,300,000 3 (Base Project Allocation - $2,300,000) 4 (4) Jay Township, T-410 over Bennet Branch 5 of Sinnemahoning Creek, Bridge 6 Rehabilitation 125,000 7 (Base Project Allocation - $125,000) 8 (5) Millstone Township, T-301 over Cline 9 Run, Bridge Rehabilitation 20,000 10 (Base Project Allocation - $20,000) 11 (6) Spring Creek Township, T-314 over 12 Unnamed Tributary of Clarion River, 13 Bridge Rehabilitation 50,000 14 (Base Project Allocation - $50,000) 15 (7) JAY TOWNSHIP, T-140 OVER BENNETT <-- 16 BRANCH SINNEMAHONING CREEK, BRIDGE 17 REPLACEMENT 300,000 18 (BASE PROJECT ALLOCATION - $200,000) 19 (LAND ALLOCATION - $50,000) 20 (DESIGN AND CONTINGENCIES - $50,000) 21 (8) JOHNSONBURG BOROUGH, SR 0219 OVER SR 22 0219, US 219, BRIDGE REPLACEMENT 1,300,000 23 (BASE PROJECT ALLOCATION - $800,000) 24 (LAND ALLOCATION - $100,000) 25 (DESIGN AND CONTINGENCIES - $400,000) 26 (9) JONES TOWNSHIP, T-368 OVER WEST 27 CLARION CREEK, BRIDGE REPLACEMENT 300,000 28 (BASE PROJECT ALLOCATION - $200,000) 29 (LAND ALLOCATION - $50,000) 30 (DESIGN AND CONTINGENCIES - $50,000) 20080S1503B2474 - 151 -
1 (10) CITY OF ST. MARYS, EBERL STREET OVER 2 IRON RUN, BRIDGE REPLACEMENT 300,000 3 (BASE PROJECT ALLOCATION - $200,000) 4 (LAND ALLOCATION - $50,000) 5 (DESIGN AND CONTINGENCIES - $50,000) 6 (11) (RESERVED) 7 (12) (RESERVED) 8 (13) (RESERVED) 9 (b) State Bridges 10 (1) SR 1008 over West Creek, City of St. 11 Marys, Bridge Rehabilitation 1,400,000 12 (Base Project Allocation - $1,000,000) 13 (Land Allocation - $200,000) 14 (Design and Contingencies - $200,000) 15 (2) SR 2007 over Mill Creek, Fox Township, 16 Bridge Replacement 215,000 17 (Base Project Allocation - $140,000) 18 (Design and Contingencies - $75,000) 19 (3) SR 0219 over Mead Run, Horton 20 Township, Bridge Replacement 1,500,000 21 (Base Project Allocation - $1,100,000) 22 (Land Allocation - $150,000) 23 (Design and Contingencies - $250,000) 24 (4) SR 3003 over Mead Run, Horton 25 Township, Bridge Replacement 300,000 26 (Base Project Allocation - $200,000) 27 (Land Allocation - $50,000) 28 (Design and Contingencies - $50,000) 29 (5) SR 1001 over Crooked Creek, Jones 30 Township, Bridge Rehabilitation 850,000 20080S1503B2474 - 152 -
1 (Base Project Allocation - $450,000) 2 (Land Allocation - $100,000) 3 (Design and Contingencies - $300,000) 4 (6) SR 4003 over Bear Creek, Jones 5 Township, Bridge Replacement 226,000 6 (Base Project Allocation - $140,000) 7 (Land Allocation - $6,000) 8 (Design and Contingencies - $80,000) 9 (7) SR 3002 over Millstone Creek, 10 Millstone Township, Bridge Replacement 1,400,000 11 (Base Project Allocation - $1,000,000) 12 (Land Allocation - $200,000) 13 (Design and Contingencies - $200,000) 14 (8) SR 3005 over Wyncoop Run, Millstone 15 Township, Bridge Replacement 296,000 16 (Base Project Allocation - $196,000) 17 (Land Allocation - $30,000) 18 (Design and Contingencies - $70,000) 19 (9) SR 0219 over Elk Creek, Ridgway 20 Borough, Bridge Replacement 1,400,000 21 (Base Project Allocation - $1,000,000) 22 (Land Allocation - $200,000) 23 (Design and Contingencies - $200,000) 24 (10) SR 0120 over Elk Creek, Ridgway 25 Township, Bridge Rehabilitation 4,380,000 26 (Base Project Allocation - $4,200,000) 27 (Land Allocation - $40,000) 28 (Design and Contingencies - $140,000) 29 (11) SR 3002 over Big Mill Creek, Ridgway 30 Township, Bridge Replacement 300,000 20080S1503B2474 - 153 -
1 (Base Project Allocation - $200,000) 2 (Land Allocation - $40,000) 3 (Design and Contingencies - $60,000) 4 (12) SR 0066 OVER SOUTH BRANCH OF TIONESTA <-- 5 CREEK, HIGHLAND TOWNSHIP, BRIDGE 6 REPLACEMENT 80,000 7 (BASE PROJECT ALLOCATION - $40,000) 8 (LAND ALLOCATION - $20,000) 9 (DESIGN AND CONTINGENCIES - $20,000) 10 (13) SR 0120 OVER TRIBUTARY OF ELK CREEK, 11 RIDGWAY TOWNSHIP, BRIDGE REPLACEMENT 62,000 12 (BASE PROJECT ALLOCATION - $28,000) 13 (LAND ALLOCATION - $20,000) 14 (DESIGN AND CONTINGENCIES - $14,000) 15 (14) SR 0120 OVER BRANCH OF ELK CREEK, 16 CITY OF SAINT MARYS, BRIDGE 17 REPLACEMENT 140,000 18 (BASE PROJECT ALLOCATION - $80,000) 19 (LAND ALLOCATION - $20,000) 20 (DESIGN AND CONTINGENCIES - $40,000) 21 (15) SR 0120, BRIDGE NO.15532 OVER BIG 22 RUN, CITY OF SAINT MARYS, BRIDGE 23 REPLACEMENT 98,000 24 (BASE PROJECT ALLOCATION - $52,000) 25 (LAND ALLOCATION - $20,000) 26 (DESIGN AND CONTINGENCIES - $26,000) 27 (16) SR 0219 OVER EAST BRANCH OF CLARION 28 RIVER, JOHNSONBURG BOROUGH, BRIDGE 29 REHABILITATION 584,000 30 (BASE PROJECT ALLOCATION - $376,000) 20080S1503B2474 - 154 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $188,000) 3 (17) SR 0255 OVER SILVER RUN, CITY OF 4 SAINT MARYS, BRIDGE REPLACEMENT 80,000 5 (BASE PROJECT ALLOCATION - $40,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $20,000) 8 (18) SR 0555 OVER KERSEY RUN, JAY 9 TOWNSHIP, BRIDGE REPLACEMENT 404,000 10 (BASE PROJECT ALLOCATION - $256,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $128,000) 13 (19) SR 0948 OVER LITTLE MILL CREEK, 14 RIDGWAY TOWNSHIP, BRIDGE REPLACEMENT 152,000 15 (BASE PROJECT ALLOCATION - $88,000) 16 (LAND ALLOCATION - $20,000) 17 (DESIGN AND CONTINGENCIES - $44,000) 18 (20) SR 0949 OVER DOG HOLLOW RUN, RIDGWAY 19 TOWNSHIP, BRIDGE REPLACEMENT 59,000 20 (BASE PROJECT ALLOCATION - $30,000) 21 (LAND ALLOCATION - $20,000) 22 (DESIGN AND CONTINGENCIES - $9,000) 23 (21) SR 1003 OVER ELK CREEK, CITY OF SAINT 24 MARYS, BRIDGE REPLACEMENT 194,000 25 (BASE PROJECT ALLOCATION - $116,000) 26 (LAND ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $58,000) 28 (22) SR 1005 OVER MILL POND, CITY OF SAINT 29 MARYS, BRIDGE REPLACEMENT 98,000 30 (BASE PROJECT ALLOCATION - $52,000) 20080S1503B2474 - 155 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $26,000) 3 (23) SR 2011 OVER BRANDY CREEK, HORTON 4 TOWNSHIP, BRIDGE REPLACEMENT 122,000 5 (BASE PROJECT ALLOCATION - $68,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $34,000) 8 (24) SR 3002 OVER MILLSTONE CREEK, 9 MILLSTONE TOWNSHIP, BRIDGE REPLACEMENT 416,000 10 (BASE PROJECT ALLOCATION - $314,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $82,000) 13 (25) SR 3002 OVER BIG MILL CREEK, RIDGWAY 14 TOWNSHIP, BRIDGE REPLACEMENT 382,000 15 (BASE PROJECT ALLOCATION - $280,000) 16 (LAND ALLOCATION - $20,000) 17 (DESIGN AND CONTINGENCIES - $82,000) 18 (26) SR 4003 OVER SILVER CREEK, RIDGWAY 19 TOWNSHIP, BRIDGE REPLACEMENT 97,000 20 (BASE PROJECT ALLOCATION - $51,000) 21 (LAND ALLOCATION - $20,000) 22 (DESIGN AND CONTINGENCIES - $26,000) 23 (27) SR 2004 OVER BENNET BRANCH 24 SINNEMAHONING CREEK, BENEZETTE 25 TOWNSHIP, BRIDGE REHABILITATION 656,000 26 (BASE PROJECT ALLOCATION - $424,000) 27 (LAND ALLOCATION - $20,000) 28 (DESIGN AND CONTINGENCIES - $212,000) 29 Section 29. Erie County. 30 (a) Local Bridges 20080S1503B2474 - 156 -
1 (1) Amity Township, T-559 over Branch of 2 French Creek, Bridge Replacement 925,000 3 (Base Project Allocation - $750,000) 4 (Land Allocation - $25,000) 5 (Design and Contingencies - $150,000) 6 (2) Elk Creek Township, T-313 over 7 Cussewago Creek, Bridge Replacement 925,000 8 (Base Project Allocation - $750,000) 9 (Land Allocation - $25,000) 10 (Design and Contingencies - $150,000) 11 (3) Fairview Township, T-515 over Goodban 12 Run, Bridge Replacement 925,000 13 (Base Project Allocation - $750,000) 14 (Land Allocation - $25,000) 15 (Design and Contingencies - $150,000) 16 (4) Franklin Township, T-434 over Falls 17 Run, Bridge Replacement 675,000 18 (Base Project Allocation - $500,000) 19 (Land Allocation - $25,000) 20 (Design and Contingencies - $150,000) 21 (5) Girard Township, T-479 over Little Elk 22 Creek, Bridge Replacement 1,175,000 23 (Base Project Allocation - $1,000,000) 24 (Land Allocation - $25,000) 25 (Design and Contingencies - $150,000) 26 (6) Girard Township, T-390 over Halls Run, 27 Bridge Replacement 925,000 28 (Base Project Allocation - $750,000) 29 (Land Allocation - $25,000) 30 (Design and Contingencies - $150,000) 20080S1503B2474 - 157 -
1 (7) Greene Township, T-305 over LeBoeuf 2 Creek, Bridge Replacement 925,000 3 (Base Project Allocation - $750,000) 4 (Land Allocation - $25,000) 5 (Design and Contingencies - $150,000) 6 (8) Harborcreek Township, T-717 over 7 Fourmile Creek, Bridge Replacement 1,175,000 8 (Base Project Allocation - $1,000,000) 9 (Land Allocation - $25,000) 10 (Design and Contingencies - $150,000) 11 (9) Harborcreek Township, T-666 over 12 Sevenmile Creek, Bridge Replacement 675,000 13 (Base Project Allocation - $500,000) 14 (Land Allocation - $25,000) 15 (Design and Contingencies - $150,000) 16 (10) Harborcreek Township, T-303 over 17 Sevenmile Creek, Bridge Replacement 675,000 18 (Base Project Allocation - $500,000) 19 (Land Allocation - $25,000) 20 (Design and Contingencies - $150,000) 21 (11) Harborcreek Township, T-650 over 22 Eightmile Creek, Bridge Replacement 675,000 23 (Base Project Allocation - $500,000) 24 (Land Allocation - $25,000) 25 (Design and Contingencies - $150,000) 26 (12) McKean Township, T-480 over Lamson 27 Run, Bridge Replacement 700,000 28 (Base Project Allocation - $350,000) 29 (Land Allocation - $50,000) 30 (Design and Contingencies - $300,000) 20080S1503B2474 - 158 -
1 (13) McKean Township, T-480 over Lamson 2 Run, Bridge Replacement 700,000 3 (Base Project Allocation - $350,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $300,000) 6 (14) McKean Township, T-480 over Lamson 7 Run, Bridge Replacement 850,000 8 (Base Project Allocation - $500,000) 9 (Land Allocation - $50,000) 10 (Design and Contingencies - $300,000) 11 (15) McKean Township, T-481 over Lamson 12 Run, Bridge Replacement 700,000 13 (Base Project Allocation - $350,000) 14 (Land Allocation - $50,000) 15 (Design and Contingencies - $300,000) 16 (16) McKean Township, T-575 over Tributary 17 of Walnut Creek, Bridge Replacement 700,000 18 (Base Project Allocation - $350,000) 19 (Land Allocation - $50,000) 20 (Design and Contingencies - $300,000) 21 (17) McKean Township, T-609 over Tributary 22 of Walnut Creek, Bridge Replacement 700,000 23 (Base Project Allocation - $350,000) 24 (Land Allocation - $50,000) 25 (Design and Contingencies - $300,000) 26 (18) McKean Township, T-549 over Dry Run, 27 Bridge Replacement 700,000 28 (Base Project Allocation - $350,000) 29 (Land Allocation - $50,000) 30 (Design and Contingencies - $300,000) 20080S1503B2474 - 159 -
1 (19) McKean Township, T-512 over Elk 2 Creek, Bridge Replacement 1,050,000 3 (Base Project Allocation - $700,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $300,000) 6 (20) McKean Township, T-512 over Tributary 7 of Elk Creek, Bridge Replacement 700,000 8 (Base Project Allocation - $350,000) 9 (Land Allocation - $50,000) 10 (Design and Contingencies - $300,000) 11 (21) McKean Township, T-490 over Tributary 12 of Elk Creek, Bridge Replacement 700,000 13 (Base Project Allocation - $350,000) 14 (Land Allocation - $50,000) 15 (Design and Contingencies - $300,000) 16 (22) Millcreek Township, T-340 over Walnut 17 Creek, Bridge Replacement 925,000 18 (Base Project Allocation - $750,000) 19 (Land Allocation - $25,000) 20 (Design and Contingencies - $150,000) 21 (23) Millcreek Township, Cidermill Road 22 over Mill Creek, Bridge Replacement 925,000 23 (Base Project Allocation - $750,000) 24 (Land Allocation - $25,000) 25 (Design and Contingencies - $150,000) 26 (24) Millcreek Township, T-665 over Mill 27 Creek, Bridge Replacement 925,000 28 (Base Project Allocation - $750,000) 29 (Land Allocation - $25,000) 30 (Design and Contingencies - $150,000) 20080S1503B2474 - 160 -
1 (25) Millcreek Township, T-442 over Walnut 2 Creek, Bridge Replacement 1,175,000 3 (Base Project Allocation - $1,000,000) 4 (Land Allocation - $25,000) 5 (Design and Contingencies - $150,000) 6 (26) North East Township, T-301 over 7 Purdue Creek, Bridge Replacement 925,000 8 (Base Project Allocation - $750,000) 9 (Land Allocation - $25,000) 10 (Design and Contingencies - $150,000) 11 (27) Springfield Township, T-348 over 12 Crooked Creek, Bridge Replacement 925,000 13 (Base Project Allocation - $750,000) 14 (Land Allocation - $25,000) 15 (Design and Contingencies - $150,000) 16 (28) Summit Township, T-558 over Walnut 17 Creek, Bridge Replacement 675,000 18 (Base Project Allocation - $500,000) 19 (Land Allocation - $25,000) 20 (Design and Contingencies - $150,000) 21 (29) Summit Township, T-534 over Elk 22 Creek, Bridge Replacement 675,000 23 (Base Project Allocation - $500,000) 24 (Land Allocation - $25,000) 25 (Design and Contingencies - $150,000) 26 (30) Waterford Township, T-300 over Trout 27 Run, Bridge Replacement 925,000 28 (Base Project Allocation - $750,000) 29 (Land Allocation - $25,000) 30 (Design and Contingencies - $150,000) 20080S1503B2474 - 161 -
1 (31) Mill Village Borough, Depot Street 2 over Branch of French Creek, Bridge 3 Replacement 675,000 4 (Base Project Allocation - $500,000) 5 (Land Allocation - $25,000) 6 (Design and Contingencies - $150,000) 7 (32) Harborcreek Township, Sawmill Road 8 over Twelve Mile Creek, Bridge 9 Replacement 675,000 10 (Base Project Allocation - $500,000) 11 (Land Allocation - $25,000) 12 (Design and Contingencies - $150,000) 13 (33) McKean Township, T-480, Old 99 over 14 Tributary of Lamson Run, Bridge 15 Replacement 700,000 16 (Base Project Allocation - $350,000) 17 (Land Allocation - $50,000) 18 (Design and Contingencies - $300,000) 19 (34) McKean Township, T-480, Old 99 over 20 Lamson Run, Bridge Replacement 700,000 21 (Base Project Allocation - $350,000) 22 (Land Allocation - $50,000) 23 (Design and Contingencies - $300,000) 24 (35) McKean Township, T-480, Old 99 over 25 Lamson Run, Bridge Replacement 850,000 26 (Base Project Allocation - $500,000) 27 (Land Allocation - $50,000) 28 (Design and Contingencies - $300,000) 29 (36) McKean Township, T-481, West 30 Stancliff Road over Lamson Run, Bridge 20080S1503B2474 - 162 -
1 Replacement 700,000 2 (Base Project Allocation - $350,000) 3 (Land Allocation - $50,000) 4 (Design and Contingencies - $300,000) 5 (37) McKean Township, T-575, Pinetree Road 6 over Tributary of Walnut Creek, Bridge 7 Replacement 700,000 8 (Base Project Allocation - $350,000) 9 (Land Allocation - $50,000) 10 (Design and Contingencies - $300,000) 11 (38) McKean Township, T-609, California 12 Road over Tributary of Walnut Creek, 13 Bridge Replacement 700,000 14 (Base Project Allocation - $350,000) 15 (Land Allocation - $50,000) 16 (Design and Contingencies - $300,000) 17 (39) McKean Township, T-549, Greenlee Road 18 over Dry Run, Bridge Replacement 700,000 19 (Base Project Allocation - $350,000) 20 (Land Allocation - $50,000) 21 (Design and Contingencies - $300,000) 22 (40) McKean Township, T-512, Oliver Road 23 over Elk Creek, Bridge Replacement 1,050,000 24 (Base Project Allocation - $700,000) 25 (Land Allocation - $50,000) 26 (Design and Contingencies - $300,000) 27 (41) McKean Township, T-512, Oliver Road 28 over Tributary of Elk Creek, Bridge 29 Replacement 700,000 30 (Base Project Allocation - $350,000) 20080S1503B2474 - 163 -
1 (Land Allocation - $50,000) 2 (Design and Contingencies - $300,000) 3 (42) McKean Township, T-490, Dunn Valley 4 Road over Tributary of Elk Creek, 5 Bridge Replacement 700,000 6 (Base Project Allocation - $350,000) 7 (Land Allocation - $50,000) 8 (Design and Contingencies - $300,000) 9 (43) MCKEAN TOWNSHIP, T-480, OLD 99 OVER <-- 10 TRIBUTARY OF LAMSON RUN, BRIDGE 11 REPLACEMENT 700,000 12 (b) State Bridges 13 (1) SR 0008, Waterford Road over Alder 14 Run, Amity Township, Bridge 15 Rehabilitation 45,000 16 (Base Project Allocation - $45,000) 17 (2) SR 3001 over Conneaut Creek, Conneaut 18 Township, Bridge Rehabilitation 750,000 19 (Base Project Allocation - $600,000) 20 (Design and Contingencies - $150,000) 21 (3) SR 3006, US 6N over Branch of Conneaut 22 Creek, Conneaut Township, Bridge 23 Rehabilitation 40,000 24 (Base Project Allocation - $40,000) 25 (4) SR 0098 over Cussewago Creek, Elk 26 Creek Township, Bridge Rehabilitation 13,000 27 (Base Project Allocation - $13,000) 28 (5) SR 0005 over Walnut Creek, Fairview 29 Township, Bridge Rehabilitation 1,400,000 30 (Base Project Allocation - $1,000,000) 20080S1503B2474 - 164 -
1 (Design and Contingencies - $400,000) 2 (6) SR 0020, Ridge Road over Walnut Creek, 3 Fairview Township, Bridge 4 Rehabilitation 13,000 5 (Base Project Allocation - $13,000) 6 (7) SR 3014 over Little Elk Creek, Girard 7 Township, Bridge Rehabilitation 120,000 8 (Base Project Allocation - $60,000) 9 (Land Allocation - $40,000) 10 (Design and Contingencies - $20,000) 11 (8) SR 3105 over SR 0090, Girard Township, 12 Bridge Rehabilitation 650,000 13 (Base Project Allocation - $500,000) 14 (Design and Contingencies - $150,000) 15 (9) SR 0005 over Twelve Mile Creek, 16 Harborcreek Township, Bridge 17 Rehabilitation 800,000 18 (Base Project Allocation - $500,000) 19 (Design and Contingencies - $300,000) 20 (10) SR 0955 over Six Mile Creek, 21 Harborcreek Township, Bridge 22 Replacement 2,200,000 23 (Base Project Allocation - $1,800,000) 24 (Design and Contingencies - $400,000) 25 (11) SR 0955 over Tributary of Seven Mile 26 Creek, Harborcreek Township, Bridge 27 Replacement 721,000 28 (Base Project Allocation - $495,000) 29 (Land Allocation - $43,000) 30 (Design and Contingencies - $183,000) 20080S1503B2474 - 165 -
1 (12) SR 4011 over SR 0090, McKean 2 Township, Bridge Rehabilitation 750,000 3 (Base Project Allocation - $600,000) 4 (Design and Contingencies - $150,000) 5 (13) SR 4011 over SR 0079, McKean 6 Township, Bridge Rehabilitation 850,000 7 (Base Project Allocation - $700,000) 8 (Design and Contingencies - $150,000) 9 (14) SR 0005 over Turkey Creek Branch, 10 Springfield Township, Bridge 11 Replacement 695,000 12 (Base Project Allocation - $470,000) 13 (Land Allocation - $42,000) 14 (Design and Contingencies - $183,000) 15 (15) SR 3101 over SR 0090, Springfield 16 Township, Bridge Rehabilitation 1,350,000 17 (Base Project Allocation - $1,200,000) 18 (Design and Contingencies - $150,000) 19 (16) SR 3102 over SR 0090, Springfield 20 Township, Bridge Rehabilitation 1,450,000 21 (Base Project Allocation - $1,300,000) 22 (Design and Contingencies - $150,000) 23 (17) SR 3103 over SR 0090, Springfield 24 Township, Bridge Rehabilitation 2,425,000 25 (Base Project Allocation - $2,200,000) 26 (Design and Contingencies - $225,000) 27 (18) SR 3104 over SR 0090, Springfield 28 Township, Bridge Rehabilitation 1,625,000 29 (Base Project Allocation - $1,400,000) 30 (Design and Contingencies - $225,000) 20080S1503B2474 - 166 -
1 (19) SR 4024, Robinson Road over Branch of 2 Walnut Creek, Summit Township, Bridge 3 Rehabilitation 30,000 4 (Base Project Allocation - $30,000) 5 (20) SR 0079 Northbound over Tributary of 6 Walnut Creek, Summit Township, Bridge 7 Rehabilitation 13,000 8 (Base Project Allocation - $13,000) 9 (21) SR 3006, US 6N over Boro Run, 10 Washington Township, Bridge 11 Rehabilitation 30,000 12 (Base Project Allocation - $30,000) 13 (22) SR 3025 over Cummings Creek, 14 Washington Township, Bridge 15 Replacement 200,000 16 (Base Project Allocation - $200,000) 17 (23) SR 3025 over Conneauttee Creek, 18 Washington Township, Bridge 19 Replacement 200,000 20 (Base Project Allocation - $200,000) 21 (24) SR 2006, Donation Road over Leboeuf 22 Creek, Waterford Township, Bridge 23 Rehabilitation 70,000 24 (Base Project Allocation - $70,000) 25 (25) SR 0079, NORTHBOUND OVER WEST 21ST <-- 26 STREET, CITY OF ERIE, BRIDGE 27 RESTORATION 104,000 28 (BASE PROJECT ALLOCATION - $104,000) 29 (26) SR 0079, NORTHBOUND OVER WEST 16TH 30 STREET, CITY OF ERIE, BRIDGE CSX AND 20080S1503B2474 - 167 -
1 N&W RAILROADS, RESTORATION 104,000 2 (BASE PROJECT ALLOCATION - $104,000) 3 (27) SR 0079, NORTHBOUND OVER WEST 32ND 4 STREET, CITY OF ERIE, BRIDGE 5 RESTORATION 104,000 6 (BASE PROJECT ALLOCATION - $104,000) 7 (28) SR 0079, NORTHBOUND OVER WALNUT 8 CREEK, MILLCREEK TOWNSHIP, BRIDGE 9 RESTORATION 104,000 10 (BASE PROJECT ALLOCATION - $104,000) 11 (29) SR 0079, SOUTHBOUND OVER WEST 21ST 12 STREET, CITY OF ERIE, BRIDGE 13 RESTORATION 104,000 14 (BASE PROJECT ALLOCATION - $104,000) 15 (30) SR 0079, SOUTHBOUND OVER WEST 16TH 16 STREET, CSX AND N&W RAILROADS, CITY OF 17 ERIE, BRIDGE RESTORATION 104,000 18 (BASE PROJECT ALLOCATION - $104,000) 19 (31) SR 0079, SOUTHBOUND OVER WEST 32ND 20 STREET, CITY OF ERIE, BRIDGE 21 RESTORATION 104,000 22 (BASE PROJECT ALLOCATION - $104,000) 23 (32) SR 0079, SOUTHBOUND OVER WALNUT 24 CREEK, MILLCREEK TOWNSHIP, BRIDGE 25 RESTORATION 104,000 26 (BASE PROJECT ALLOCATION - $104,000) 27 Section 30. Fayette County. 28 (a) Local Bridges 29 (1) Brownsville Township, TR 440, Century 30 Bridge over Tributary of Monongahela 20080S1503B2474 - 168 -
1 River, Bridge Rehabilitation 100,000 2 (Base Project Allocation - $100,000) 3 (2) PERRY TOWNSHIP, HAPPY VALLEY ROAD OVER <-- 4 ABANDONED RAILROAD, BRIDGE REPLACEMENT 450,000 5 (BASE PROJECT ALLOCATION - $430,000) 6 (DESIGN AND CONTINGENCIES - $20,000) 7 (b) State Bridges 8 (1) SR 1029 over SR 0119, Bullskin 9 Township, Bridge Replacement 750,000 10 (Base Project Allocation - $600,000) 11 (Land Allocation - $30,000) 12 (Design and Contingencies - $120,000) 13 (2) SR 8017 over Irish Run, Bullskin 14 Township, Bridge Replacement 1,425,000 15 (Base Project Allocation - $1,030,000) 16 (Land Allocation - $40,000) 17 (Design and Contingencies - $355,000) 18 (3) SR 1039 over Branch of Dickerson Run, 19 Dunbar Township, Bridge Replacement 262,000 20 (Base Project Allocation - $188,000) 21 (Land Allocation - $8,000) 22 (Design and Contingencies - $66,000) 23 (4) SR 1051 over Branch of Opossum Run, 24 Dunbar Township, Bridge Replacement 920,000 25 (Base Project Allocation - $650,000) 26 (Land Allocation - $40,000) 27 (Design and Contingencies - $230,000) 28 (5) SR 4032 over Bolden Run, Franklin 29 Township, Bridge Replacement 206,000 30 (Base Project Allocation - $146,000) 20080S1503B2474 - 169 -
1 (Land Allocation - $8,000) 2 (Design and Contingencies - $52,000) 3 (6) Conrail Railroad over SR 3007, Georges 4 Township, Bridge Removal 570,000 5 (Base Project Allocation - $195,000) 6 (Land Allocation - $125,000) 7 (Design and Contingencies - $250,000) 8 (7) SR 0857 over Branch of Mountain Creek, 9 Georges Township, Bridge Replacement 990,000 10 (Base Project Allocation - $700,000) 11 (Land Allocation - $40,000) 12 (Design and Contingencies - $250,000) 13 (8) SR 3010 over York Run, Georges 14 Township, Bridge Replacement 440,000 15 (Base Project Allocation - $318,000) 16 (Land Allocation - $8,000) 17 (Design and Contingencies - $114,000) 18 (9) SR 3013, Bridge No.16919 over Middle 19 Run, German Township, Bridge 20 Replacement 274,000 21 (Base Project Allocation - $196,000) 22 (Land Allocation - $8,000) 23 (Design and Contingencies - $70,000) 24 (10) SR 3013, Bridge No.16920 over Middle 25 Run, German Township, Bridge 26 Replacement 426,000 27 (Base Project Allocation - $333,000) 28 (Land Allocation - $8,000) 29 (Design and Contingencies - $85,000) 30 (11) SR 4011 over Branch of Washwater Run, 20080S1503B2474 - 170 -
1 Jefferson Township, Bridge Replacement 920,000 2 (Base Project Allocation - $650,000) 3 (Land Allocation - $40,000) 4 (Design and Contingencies - $230,000) 5 (12) SR 4003 over Cox Run, Luzerne 6 Township, Bridge Replacement 1,295,000 7 (Base Project Allocation - $925,000) 8 (Land Allocation - $40,000) 9 (Design and Contingencies - $330,000) 10 (13) SR 4022 over Rush Run, Luzerne 11 Township, Bridge Replacement 2,830,000 12 (Base Project Allocation - $2,305,000) 13 (Land Allocation - $40,000) 14 (Design and Contingencies - $485,000) 15 (14) SR 2021 over Shutes Run, North Union 16 Township, Bridge Replacement 1,050,000 17 (Base Project Allocation - $250,000) 18 (Land Allocation - $250,000) 19 (Design and Contingencies - $550,000) 20 (15) SR 2023 over Benningtons Spring Run, 21 North Union Township, Bridge 22 Replacement 313,000 23 (Base Project Allocation - $225,000) 24 (Land Allocation - $8,000) 25 (Design and Contingencies - $80,000) 26 (16) SR 4038 over Youghiogheny River 27 Trail, Perry Township, Bridge 28 Replacement 6,450,000 29 (Base Project Allocation - $6,000,000) 30 (Land Allocation - $100,000) 20080S1503B2474 - 171 -
1 (Design and Contingencies - $350,000) 2 (17) SR 4038 over Branch of Washington 3 Run, Perry Township, Bridge 4 Replacement 795,000 5 (Base Project Allocation - $555,000) 6 (Land Allocation - $40,000) 7 (Design and Contingencies - $200,000) 8 (18) TR 763 over SR 4038, Perry Township, 9 Bridge Replacement 6,450,000 10 (Base Project Allocation - $6,000,000) 11 (Land Allocation - $100,000) 12 (Design and Contingencies - $350,000) 13 (19) SR 0381 over Branch of Indian Creek, 14 Saltlick Township, Bridge Replacement 850,000 15 (Base Project Allocation - $600,000) 16 (Land Allocation - $40,000) 17 (Design and Contingencies - $210,000) 18 (20) SR 1007 over Champion Creek, Saltlick 19 Township, Bridge Replacement 442,000 20 (Base Project Allocation - $320,000) 21 (Land Allocation - $8,000) 22 (Design and Contingencies - $114,000) 23 (21) SR 1054 over Newmyer Run, Saltlick 24 Township, Bridge Replacement 234,000 25 (Base Project Allocation - $168,000) 26 (Land Allocation - $8,000) 27 (Design and Contingencies - $58,000) 28 (22) SR 0040 over SR 0043, South Union 29 Township, Bridge Replacement 1,282,000 30 (Base Project Allocation - $1,096,000) 20080S1503B2474 - 172 -
1 (Land Allocation - $8,000) 2 (Design and Contingencies - $178,000) 3 (23) SR 2025 over Benningtons Spring Run, 4 South Union Township, Bridge 5 Replacement 1,225,000 6 (Base Project Allocation - $750,000) 7 (Land Allocation - $75,000) 8 (Design and Contingencies - $400,000) 9 (24) SR 3009 over Coal Lick Run, South 10 Union Township, Bridge Replacement 1,050,000 11 (Base Project Allocation - $650,000) 12 (Land Allocation - $150,000) 13 (Design and Contingencies - $250,000) 14 (25) SR 0119 over Branch of Georges Creek, 15 Springhill Township, Bridge 16 Replacement 580,000 17 (Base Project Allocation - $400,000) 18 (Land Allocation - $40,000) 19 (Design and Contingencies - $140,000) 20 (26) SR 3003 over Branch of Georges Creek, 21 Springhill Township, Bridge 22 Replacement 635,000 23 (Base Project Allocation - $435,000) 24 (Land Allocation - $40,000) 25 (Design and Contingencies - $160,000) 26 (27) SR 0381 over Bear Run, Stewart 27 Township, Bridge Replacement 1,225,000 28 (Base Project Allocation - $750,000) 29 (Land Allocation - $75,000) 30 (Design and Contingencies - $400,000) 20080S1503B2474 - 173 -
1 (28) SR 4019 over Branch of Little 2 Redstone Creek, Washington Township, 3 Bridge Replacement 162,000 4 (Base Project Allocation - $114,000) 5 (Land Allocation - $8,000) 6 (Design and Contingencies - $40,000) 7 (29) SR 4019 over Mill Run, Washington 8 Township, Bridge Replacement 560,000 9 (Base Project Allocation - $380,000) 10 (Land Allocation - $40,000) 11 (Design and Contingencies - $140,000) 12 (30) SR 0040 over Bradocks Run, Wharton 13 Township, Bridge Replacement 880,000 14 (Base Project Allocation - $620,000) 15 (Land Allocation - $40,000) 16 (Design and Contingencies - $220,000) 17 (31) SR 2002 over Branch of Big Sandy 18 Creek, Wharton Township, Bridge 19 Replacement 520,000 20 (Base Project Allocation - $350,000) 21 (Land Allocation - $40,000) 22 (Design and Contingencies - $130,000) 23 (32) SR 2003 over Chaney Run, Wharton 24 Township, Bridge Replacement 1,145,000 25 (Base Project Allocation - $815,000) 26 (Land Allocation - $40,000) 27 (Design and Contingencies - $290,000) 28 (33) SR 2011 over Beaver Creek, Wharton 29 Township, Bridge Replacement 314,000 30 (Base Project Allocation - $230,000) 20080S1503B2474 - 174 -
1 (Land Allocation - $8,000) 2 (Design and Contingencies - $76,000) 3 Section 31. Forest County. 4 (a) Local Bridges (Reserved) 5 (b) State Bridges 6 (1) SR 2002, Forest Road over Coleman Run, 7 Barnett Township, Bridge 8 Rehabilitation 29,000 9 (Base Project Allocation - $29,000) 10 (2) SR 3004, Golinza Road over Branch of 11 Coon Creek, Greene Township, Bridge 12 Replacement 130,000 13 (Base Project Allocation - $130,000) 14 Section 32. Franklin County. 15 (a) Local Bridges 16 (1) Washington Township, T-695 over 17 Antietam Creek, Bridge Replacement 1,250,000 18 (Base Project Allocation - $1,250,000) 19 (b) State Bridges 20 (1) SR 3015, Guitner Road over 21 Conococheaque Creek, Antrim Township, 22 Bridge Rehabilitation 2,550,000 23 (Base Project Allocation - $1,170,000) 24 (Design and Contingencies - $1,380,000) 25 (2) US 11 over Conococheaque Creek, Greene 26 Township, Bridge Replacement 120,000 27 (Land Allocation - $20,000) 28 (Design and Contingencies - $100,000) 29 (3) SR 4010 over Rock Spring Branch of 30 Back Creek, Hamilton Township, Bridge 20080S1503B2474 - 175 -
1 Rehabilitation 2,210,000 2 (Base Project Allocation - $1,000,000) 3 (Design and Contingencies - $1,210,000) 4 (4) PA 533 over Lehman Run, Letterkenny 5 Township, Bridge Replacement 420,000 6 (Base Project Allocation - $300,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $100,000) 9 (5) SR 0641, PA 641 over Clippinger Run, 10 Lurgan Township, Bridge Replacement 100,000 11 (Base Project Allocation - $100,000) 12 (6) PA 416 over West Branch of 13 Conococheague Creek, Peters Township, 14 Bridge Replacement 420,000 15 (Base Project Allocation - $300,000) 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $100,000) 18 (7) SR 0016 over Buck Run, Peters 19 Township, Bridge Replacement 420,000 20 (Base Project Allocation - $300,000) 21 (Land Allocation - $20,000) 22 (Design and Contingencies - $100,000) 23 (8) SR 4002 over Rocky Hollow Creek, 24 Peters Township, Bridge Replacement 100,000 25 (Base Project Allocation - $100,000) 26 (9) SR 3002, Williamson Road over Back 27 Creek, St. Thomas Township, Bridge 28 Rehabilitation 2,204,000 29 (Base Project Allocation - $2,204,000) 30 (10) SR 0433, Rowe Run Road over Rowe Run, 20080S1503B2474 - 176 -
1 Southampton Township, Bridge 2 Rehabilitation 1,680,000 3 (Base Project Allocation - $760,000) 4 (Design and Contingencies - $920,000) 5 (11) SR 0016, Buchanan Trail over West 6 Branch of Little Antietam Creek, 7 Waynesboro Borough, Bridge Replacement 370,000 8 (Base Project Allocation - $250,000) 9 (Land Allocation - $20,000) 10 (Design and Contingencies - $100,000) 11 (12) I-81 Northbound, Bridge No.17389, 12 over Abandoned Railroad, Greene 13 Township, Bridge Removal 324,000 14 (Base Project Allocation - $324,000) 15 (13) I-81 Northbound, Bridge No.17390, 16 over Conococheague Creek, Greene 17 Township, Bridge Replacement 905,000 18 (Base Project Allocation - $905,000) 19 (14) I-81 Southbound, Bridge No.17392, 20 over Abandoned Railroad, Greene 21 Township, Bridge Removal 324,000 22 (Base Project Allocation - $324,000) 23 (15) I-81 Southbound, Bridge No.17393, 24 over Conococheague Creek, Greene 25 Township, Bridge Replacement 905,000 26 (Base Project Allocation - $905,000) 27 (16) SR 1003, Bridge No.17483, over I-81, 28 Greene Township, Bridge Rehabilitation 130,000 29 (Base Project Allocation - $130,000) 30 Section 33. Fulton County. 20080S1503B2474 - 177 -
1 (a) Local Bridges (Reserved) <--
2 (A) LOCAL BRIDGES <--
3 (1) TODD TOWNSHIP, T-415, NARROWS ROAD
4 OVER LICKING CREEK, BRIDGE REPLACEMENT 150,000
5 (BASE PROJECT ALLOCATION - $150,000)
6 (b) State Bridges
7 (1) I-70 over Tributary of Little
8 Tonoloway Creek, Bethel Township,
9 Bridge Replacement 605,000
10 (Base Project Allocation - $500,000)
11 (Design and Contingencies - $105,000)
12 (2) SR 0484 over I-70, Bethel Township,
13 Bridge Rehabilitation 869,000
14 (Base Project Allocation - $769,000)
15 (Design and Contingencies - $100,000)
16 (3) SR 1010 over South Branch of Little
17 Aughwick Creek, Dublin Township, Bridge
18 Rehabilitation 533,000
19 (Base Project Allocation - $533,000)
20 (4) SR 0030 over Patterson Run, Licking
21 Creek Township, Bridge Replacement 433,000
22 (Base Project Allocation - $370,000)
23 (Land Allocation - $58,000)
24 (Design and Contingencies - $5,000)
25 (5) SR 0928 over Licking Creek, Thompson
26 Township, Bridge Replacement 275,000
27 (Base Project Allocation - $275,000)
28 Section 34. Greene County.
29 (a) Local Bridges
30 (1) Perry Township, T-008 over Shannon
20080S1503B2474 - 178 -
1 Run, Bridge Replacement 1,000,000 2 (Base Project Allocation - $1,000,000) 3 (2) Morgan Township, T-999 over Burson 4 Plan, Bridge Replacement 1,600,000 5 (Base Project Allocation - $1,600,000) 6 (3) Richhill Township, T-078 over Owens 7 Run, Bridge Replacement 800,000 8 (Base Project Allocation - $800,000) 9 (4) Cumberland Township, T-015 over Muddy 10 Creek, Bridge Replacement 1,000,000 11 (Base Project Allocation - $1,000,000) 12 (5) Washington Township, T-097 over 13 Craynes Run, Bridge Replacement 750,000 14 (Base Project Allocation - $750,000) 15 (6) Gilmore Township, T-055 over Bloody 16 Run, Bridge Replacement 600,000 17 (Base Project Allocation - $600,000) 18 (7) Morris Township, T-063 over Grays 19 Fork, Bridge Replacement 650,000 20 (Base Project Allocation - $650,000) 21 (8) Franklin Township, T-031 over Smith 22 Creek, Bridge Replacement 1,000,000 23 (Base Project Allocation - $1,000,000) 24 (9) Morris Township, T-075 over Browns 25 Creek, Bridge Replacement 1,000,000 26 (Base Project Allocation - $1,000,000) 27 (10) Morgan Township, T-089 over Browns 28 Creek, Bridge Replacement 750,000 29 (Base Project Allocation - $750,000) 30 (b) State Bridges 20080S1503B2474 - 179 -
1 (1) SR 3001 over South Fork of Wheeling 2 Creek, Aleppo Township, Bridge 3 Replacement 1,225,000 4 (Base Project Allocation - $750,000) 5 (Land Allocation - $75,000) 6 (Design and Contingencies - $400,000) 7 (2) SR 3012 over South Fork of Wheeling 8 Creek, Aleppo Township, Bridge 9 Replacement 368,000 10 (Base Project Allocation - $264,000) 11 (Land Allocation - $8,000) 12 (Design and Contingencies - $96,000) 13 (3) SR 3018 over Branch of Blacks Creek, 14 Aleppo Township, Bridge Replacement 780,000 15 (Base Project Allocation - $550,000) 16 (Land Allocation - $40,000) 17 (Design and Contingencies - $190,000) 18 (4) SR 0018 over Hoge Run, Center 19 Township, Bridge Replacement 1,225,000 20 (Base Project Allocation - $750,000) 21 (Land Allocation - $75,000) 22 (Design and Contingencies - $400,000) 23 (5) SR 0018 over Branch of McCourtney Run, 24 Center Township, Bridge Replacement 1,225,000 25 (Base Project Allocation - $750,000) 26 (Land Allocation - $75,000) 27 (Design and Contingencies - $400,000) 28 (6) SR 3013 over Branch of Pursley Creek, 29 Center Township, Bridge Replacement 485,000 30 (Base Project Allocation - $325,000) 20080S1503B2474 - 180 -
1 (Land Allocation - $40,000) 2 (Design and Contingencies - $120,000) 3 (7) SR 1017 over Branch of Pumpkin Run, 4 Cumberland Township, Bridge 5 Replacement 218,000 6 (Base Project Allocation - $156,000) 7 (Land Allocation - $8,000) 8 (Design and Contingencies - $54,000) 9 (8) SR 1021 over Branch of Muddy Creek, 10 Cumberland Township, Bridge 11 Replacement 820,000 12 (Base Project Allocation - $580,000) 13 (Land Allocation - $40,000) 14 (Design and Contingencies - $200,000) 15 (9) SR 1021 over Muddy Creek, Cumberland 16 Township, Bridge Replacement 1,700,000 17 (Base Project Allocation - $1,400,000) 18 (Design and Contingencies - $300,000) 19 (10) SR 2013 over Muddy Creek, Cumberland 20 Township, Bridge Replacement 2,300,000 21 (Base Project Allocation - $1,900,000) 22 (Land Allocation - $50,000) 23 (Design and Contingencies - $350,000) 24 (11) SR 0088, Bridge No.18127 over 25 Tributary of Monongahela River, Dunkard 26 Township, Bridge Replacement 540,000 27 (Base Project Allocation - $370,000) 28 (Land Allocation - $40,000) 29 (Design and Contingencies - $130,000) 30 (12) SR 0088, Bridge No.18129 over 20080S1503B2474 - 181 -
1 Tributary of Monongahela River, Dunkard 2 Township, Bridge Replacement 820,000 3 (Base Project Allocation - $580,000) 4 (Land Allocation - $40,000) 5 (Design and Contingencies - $200,000) 6 (13) SR 2021 over Dunkard Creek, Dunkard 7 Township, Bridge Replacement 1,003,000 8 (Base Project Allocation - $839,000) 9 (Land Allocation - $8,000) 10 (Design and Contingencies - $156,000) 11 (14) SR 0218, Bridge No.18174 over Branch 12 of Smith Creek, Franklin Township, 13 Bridge Replacement 850,000 14 (Base Project Allocation - $600,000) 15 (Land Allocation - $40,000) 16 (Design and Contingencies - $210,000) 17 (15) SR 0218, Bridge No.18176 over Branch 18 of Smith Creek, Franklin Township, 19 Bridge Replacement 1,060,000 20 (Base Project Allocation - $750,000) 21 (Land Allocation - $40,000) 22 (Design and Contingencies - $270,000) 23 (16) SR 1003 over SR 0079, Franklin 24 Township, Bridge Replacement 1,540,000 25 (Base Project Allocation - $1,300,000) 26 (Land Allocation - $40,000) 27 (Design and Contingencies - $20,000) 28 (17) SR 1024 over SR 0079, Franklin 29 Township, Bridge Replacement 1,540,000 30 (Base Project Allocation - $1,300,000) 20080S1503B2474 - 182 -
1 (Land Allocation - $40,000) 2 (Design and Contingencies - $200,000) 3 (18) SR 4007 over Ten Mile Creek, Gray 4 Township, Bridge Replacement 830,000 5 (Base Project Allocation - $580,000) 6 (Land Allocation - $40,000) 7 (Design and Contingencies - $210,000) 8 (19) SR 3009 over Branch of Toms Run, 9 Jackson Township, Bridge Removal 385,000 10 (Base Project Allocation - $255,000) 11 (Land Allocation - $40,000) 12 (Design and Contingencies - $90,000) 13 (20) SR 0188 over Branch of South Fork of 14 Ten Mile Creek, Jefferson Township, 15 Bridge Replacement 2,500,000 16 (Base Project Allocation - $2,100,000) 17 (Land Allocation - $50,000) 18 (Design and Contingencies - $350,000) 19 (21) SR 1016 over Little Whiteley Creek, 20 Monongahela Township, Bridge 21 Replacement 325,000 22 (Base Project Allocation - $150,000) 23 (Land Allocation - $75,000) 24 (Design and Contingencies - $100,000) 25 (22) SR 2016 over Cumberland Mine 26 Railroad, Monongahela Township, Bridge 27 Replacement 390,000 28 (Base Project Allocation - $299,000) 29 (Land Allocation - $8,000) 30 (Design and Contingencies - $83,000) 20080S1503B2474 - 183 -
1 (23) SR 0221 over Grimes Run, Morgan 2 Township, Bridge Replacement 880,000 3 (Base Project Allocation - $620,000) 4 (Land Allocation - $40,000) 5 (Design and Contingencies - $220,000) 6 (24) SR 1014 over Branch of Castile Run, 7 Morgan Township, Bridge Replacement 385,000 8 (Base Project Allocation - $255,000) 9 (Land Allocation - $40,000) 10 (Design and Contingencies - $90,000) 11 (25) SR 2003 over Bacon Run, Perry 12 Township, Bridge Replacement 820,000 13 (Base Project Allocation - $580,000) 14 (Land Allocation - $40,000) 15 (Design and Contingencies - $200,000) 16 (26) SR 1010 over Pumpkin Run, Rices 17 Landing Borough, Bridge Replacement 808,000 18 (Base Project Allocation - $736,000) 19 (Land Allocation - $8,000) 20 (Design and Contingencies - $64,000) 21 (27) SR 3001 over Branch of South Fork of 22 Wheeling Creek, Richhill Township, 23 Bridge Replacement 825,000 24 (Base Project Allocation - $585,000) 25 (Land Allocation - $40,000) 26 (Design and Contingencies - $200,000) 27 (28) SR 3007 over Whitethorn Run, Richhill 28 Township, Bridge Replacement 274,000 29 (Base Project Allocation - $196,000) 30 (Land Allocation - $8,000) 20080S1503B2474 - 184 -
1 (Design and Contingencies - $70,000) 2 (29) SR 3022 over Branch of North Fork of 3 Wheeling Creek, Richhill Township, 4 Bridge Replacement 730,000 5 (Base Project Allocation - $510,000) 6 (Land Allocation - $40,000) 7 (Design and Contingencies - $180,000) 8 (30) SR 4007 over Owens Run, Richhill 9 Township, Bridge Replacement 605,000 10 (Base Project Allocation - $415,000) 11 (Land Allocation - $40,000) 12 (Design and Contingencies - $150,000) 13 (31) SR 3010 over Coon Run, Springhill 14 Township, Bridge Replacement 830,000 15 (Base Project Allocation - $585,000) 16 (Land Allocation - $40,000) 17 (Design and Contingencies - $205,000) 18 (32) SR 0079, Bridge No.18120 over SR 19 0221, Ruff Creek, Washington Township, 20 Bridge Replacement 870,000 21 (Base Project Allocation - $750,000) 22 (Land Allocation - $20,000) 23 (Design and Contingencies - $100,000) 24 (33) SR 0079, Bridge No.18121 over SR 25 0221, Ruff Creek, Washington Township, 26 Bridge Replacement 870,000 27 (Base Project Allocation - $750,000) 28 (Land Allocation - $20,000) 29 (Design and Contingencies - $100,000) 30 (34) SR 2001 over Branch of Rudolph Run, 20080S1503B2474 - 185 -
1 Wayne Township, Bridge Replacement 223,000 2 (Base Project Allocation - $159,000) 3 (Land Allocation - $8,000) 4 (Design and Contingencies - $56,000) 5 (35) SR 2003 over Whiteley Creek, Whiteley 6 Township, Bridge Replacement 318,000 7 (Base Project Allocation - $230,000) 8 (Land Allocation - $8,000) 9 (Design and Contingencies - $80,000) 10 (36) SR 2018 over Branch of Whiteley 11 Creek, Whiteley Township, Bridge 12 Replacement 985,000 13 (Base Project Allocation - $695,000) 14 (Land Allocation - $40,000) 15 (Design and Contingencies - $250,000) 16 (37) SR 2030 over SR 0079, Whiteley 17 Township, Bridge Replacement 1,540,000 18 (Base Project Allocation - $1,300,000) 19 (Land Allocation - $40,000) 20 (Design and Contingencies - $200,000) 21 (38) SR 0221 OVER BOYD RUN, WASHINGTON <-- 22 TOWNSHIP, BRIDGE REPLACEMENT 1,058,000 23 (BASE PROJECT ALLOCATION - $624,000) 24 (LAND ALLOCATION - $200,000) 25 (DESIGN AND CONTINGENCIES - $234,000) 26 Section 35. Huntingdon County. 27 (a) Local Bridges (Reserved) 28 (b) State Bridges 29 (1) SR 3008 over Little Trough Creek, Cass 30 Township, Bridge Replacement 275,000 20080S1503B2474 - 186 -
1 (Base Project Allocation - $275,000)
2 (2) SR 2024 over Sideling Hill Creek, Clay
3 Township, Bridge Replacement 275,000
4 (Base Project Allocation - $275,000)
5 (3) SR 3039 over Branch of Crooked Creek,
6 Porter Township, Bridge Rehabilitation 70,000
7 (Base Project Allocation - $70,000)
8 Section 36. Indiana County.
9 (a) Local Bridges (Reserved) <--
10 (A) LOCAL BRIDGES <--
11 (1) CHERRYHILL TOWNSHIP, T-686 OVER TWO
12 LICK CREEK, BRIDGE REPLACEMENT 1,950,000
13 (BASE PROJECT ALLOCATION - $1,600,000)
14 (LAND ALLOCATION - $30,000)
15 (DESIGN AND CONTINGENCIES - $320,000)
16 (2) BRUSH VALLEY TOWNSHIP, T-716 OVER
17 BRUSH CREEK, BRIDGE REPLACEMENT 1,470,000
18 (BASE PROJECT ALLOCATION - $1,200,000)
19 (LAND ALLOCATION - $30,000)
20 (DESIGN AND CONTINGENCIES - $240,000)
21 (3) BANKS TOWNSHIP, T-974 OVER BEAR RUN,
22 BRIDGE REPLACEMENT 1,230,000
23 (BASE PROJECT ALLOCATION - $1,000,000)
24 (LAND ALLOCATION - $30,000)
25 (DESIGN AND CONTINGENCIES - $200,000)
26 (4) WASHINGTON TOWNSHIP, T-488 OVER
27 CROOKED CREEK, BRIDGE REPLACEMENT 2,010,000
28 (BASE PROJECT ALLOCATION - $1,650,000)
29 (LAND ALLOCATION - $30,000)
30 (DESIGN AND CONTINGENCIES - $330,000)
20080S1503B2474 - 187 -
1 (5) BLACK LICK TOWNSHIP, T-460 OVER 2 AULTMANS RUN, BRIDGE REPLACEMENT 980,000 3 (BASE PROJECT ALLOCATION - $750,000) 4 (LAND ALLOCATION - $30,000) 5 (DESIGN AND CONTINGENCIES - $200,000) 6 (6) CENTER TOWNSHIP, T-465 OVER MUDDY RUN, 7 BRIDGE REPLACEMENT 980,000 8 (BASE PROJECT ALLOCATION - $750,000) 9 (LAND ALLOCATION - $30,000) 10 (DESIGN AND CONTINGENCIES - $200,000) 11 (7) SOUTH MAHONING TOWNSHIP, T-373 OVER 12 ROSS RUN, BRIDGE REPLACEMENT 980,000 13 (BASE PROJECT ALLOCATION - $750,000) 14 (LAND ALLOCATION - $30,000) 15 (DESIGN AND CONTINGENCIES - $200,000) 16 (8) BRUSH VALLEY TOWNSHIP, T-734 OVER 17 BRUSH CREEK, BRIDGE REPLACEMENT 980,00 18 (BASE PROJECT ALLOCATION - $750,000) 19 (LAND ALLOCATION - $30,000) 20 (DESIGN AND CONTINGENCIES - $200,000) 21 (9) CONEMAUGH TOWNSHIP, T-652 OVER BIG 22 RUN, BRIDGE REPLACEMENT 1,530,000 23 (BASE PROJECT ALLOCATION - $1,250,000) 24 (LAND ALLOCATION - $30,000) 25 (DESIGN AND CONTINGENCIES - $250,000) 26 (b) State Bridges 27 (1) SR 0056 over Walker Run, Armstrong 28 Township, Bridge Replacement 261,000 29 (Base Project Allocation - $81,000) 30 (Land Allocation - $40,000) 20080S1503B2474 - 188 -
1 (Design and Contingencies - $140,000) 2 (2) SR 4001 over Tributary of Mitchell 3 Run, Armstrong Township, Bridge 4 Replacement 229,000 5 (Base Project Allocation - $49,000) 6 (Land Allocation - $40,000) 7 (Design and Contingencies - $140,000) 8 (3) SR 4002 over Mitchell Run, Armstrong 9 Township, Bridge Replacement 254,000 10 (Base Project Allocation - $74,000) 11 (Land Allocation - $40,000) 12 (Design and Contingencies - $140,000) 13 (4) SR 0286 over Horton Run, Banks 14 Township, Bridge Replacement 294,000 15 (Base Project Allocation - $114,000) 16 (Land Allocation - $40,000) 17 (Design and Contingencies - $140,000) 18 (5) SR 1033 over South Branch of Bear Run, 19 Banks Township, Bridge Replacement 236,000 20 (Base Project Allocation - $56,000) 21 (Land Allocation - $40,000) 22 (Design and Contingencies - $140,000) 23 (6) SR 0217 over Greys Run, Black Lick 24 Township, Bridge Replacement 224,000 25 (Base Project Allocation - $44,000) 26 (Land Allocation - $40,000) 27 (Design and Contingencies - $140,000) 28 (7) SR 3013 over Stewart Run, Black Lick 29 Township, Bridge Replacement 249,000 30 (Base Project Allocation - $69,000) 20080S1503B2474 - 189 -
1 (Land Allocation - $40,000) 2 (Design and Contingencies - $140,000) 3 (8) SR 0217 over Falling Run, Blairsville 4 Borough, Bridge Replacement 231,000 5 (Base Project Allocation - $51,000) 6 (Land Allocation - $40,000) 7 (Design and Contingencies - $140,000) 8 (9) SR 0056 over Little Brush Creek, Brush 9 Valley Township, Bridge Replacement 344,000 10 (Base Project Allocation - $164,000) 11 (Land Allocation - $40,000) 12 (Design and Contingencies - $140,000) 13 (10) SR 2018 over Tributary of Brush 14 Creek, Brush Valley Township, Bridge 15 Replacement 224,000 16 (Base Project Allocation - $44,000) 17 (Land Allocation - $40,000) 18 (Design and Contingencies - $140,000) 19 (11) SR 2012 over Mardis Run, Buffington 20 Township, Bridge Replacement 292,000 21 (Base Project Allocation - $112,000) 22 (Land Allocation - $40,000) 23 (Design and Contingencies - $140,000) 24 (12) SR 2013 over Tributary of Blacklick 25 Creek, Buffington Township, Bridge 26 Replacement 233,000 27 (Base Project Allocation - $53,000) 28 (Land Allocation - $40,000) 29 (Design and Contingencies - $140,000) 30 (13) SR 1038 over Broadhead Run, Canoe 20080S1503B2474 - 190 -
1 Township, Bridge Replacement 215,000 2 (Base Project Allocation - $35,000) 3 (Land Allocation - $40,000) 4 (Design and Contingencies - $140,000) 5 (14) SR 1038 over Straight Run, Canoe 6 Township, Bridge Replacement 312,000 7 (Base Project Allocation - $132,000) 8 (Land Allocation - $40,000) 9 (Design and Contingencies - $140,000) 10 (15) SR 1038 over Brewer Run, Canoe 11 Township, Bridge Replacement 239,000 12 (Base Project Allocation - $59,000) 13 (Land Allocation - $40,000) 14 (Design and Contingencies - $140,000) 15 (16) SR 1038 over Leasure Run, Canoe 16 Township, Bridge Replacement 224,000 17 (Base Project Allocation - $44,000) 18 (Land Allocation - $40,000) 19 (Design and Contingencies - $140,000) 20 (17) SR 1045 over Painter Run, Canoe 21 Township, Bridge Replacement 243,000 22 (Base Project Allocation - $63,000) 23 (Land Allocation - $40,000) 24 (Design and Contingencies - $140,000) 25 (18) SR 1047 over Tributary of Canoe 26 Creek, Canoe Township, Bridge 27 Replacement 235,000 28 (Base Project Allocation - $150,000) 29 (Land Allocation - $15,000) 30 (Design and Contingencies - $70,000) 20080S1503B2474 - 191 -
1 (19) SR 1052 over Tributary of Canoe 2 Creek, Canoe Township, Bridge 3 Replacement 240,000 4 (Base Project Allocation - $60,000) 5 (Land Allocation - $40,000) 6 (Design and Contingencies - $140,000) 7 (20) SR 3014 over Stewart Run, Center 8 Township, Bridge Replacement 203,000 9 (Base Project Allocation - $23,000) 10 (Land Allocation - $40,000) 11 (Design and Contingencies - $140,000) 12 (21) SR 0422 Eastbound over T-604, Metz 13 Road, Cherryhill Township, Bridge 14 Rehabilitation 750,000 15 (Base Project Allocation - $750,000) 16 (22) SR 0422 Westbound over T-604, Metz 17 Road, Cherryhill Township, Bridge 18 Rehabilitation 750,000 19 (Base Project Allocation - $750,000) 20 (23) SR 1012 over Penn Run, Cherryhill 21 Township, Bridge Replacement 277,000 22 (Base Project Allocation - $97,000) 23 (Land Allocation - $40,000) 24 (Design and Contingencies - $140,000) 25 (24) SR 0286, Bridge No.19082 over 26 Blacklegs Creek, Conemaugh Township, 27 Bridge Replacement 520,000 28 (Base Project Allocation - $340,000) 29 (Land Allocation - $40,000) 30 (Design and Contingencies - $140,000) 20080S1503B2474 - 192 -
1 (25) SR 3003 over Elders Run, Conemaugh 2 Township, Bridge Replacement 256,000 3 (Base Project Allocation - $76,000) 4 (Land Allocation - $40,000) 5 (Design and Contingencies - $140,000) 6 (26) SR 3007 over Marshall Run, Conemaugh 7 Township, Bridge Replacement 230,000 8 (Base Project Allocation - $50,000) 9 (Land Allocation - $40,000) 10 (Design and Contingencies - $140,000) 11 (27) SR 3007 over Roaring Run, Conemaugh 12 Township, Bridge Replacement 235,000 13 (Base Project Allocation - $55,000) 14 (Land Allocation - $40,000) 15 (Design and Contingencies - $140,000) 16 (28) SR 3009 over Aultmans Run, Conemaugh 17 Township, Bridge Replacement 1,276,000 18 (Base Project Allocation - $1,096,000) 19 (Land Allocation - $40,000) 20 (Design and Contingencies - $140,000) 21 (29) SR 0110 over Crooked Creek, Creekside 22 Borough, Bridge Replacement 1,039,000 23 (Base Project Allocation - $859,000) 24 (Land Allocation - $40,000) 25 (Design and Contingencies - $140,000) 26 (30) SR 0119 over Pine Run, East Mahoning 27 Township, Bridge Replacement 343,000 28 (Base Project Allocation - $163,000) 29 (Land Allocation - $40,000) 30 (Design and Contingencies - $140,000) 20080S1503B2474 - 193 -
1 (31) SR 0403 over Pine Run, East Mahoning 2 Township, Bridge Replacement 365,000 3 (Base Project Allocation - $185,000) 4 (Land Allocation - $40,000) 5 (Design and Contingencies - $140,000) 6 (32) SR 4015 over Ross Run, East Mahoning 7 Township, Bridge Replacement 284,000 8 (Base Project Allocation - $104,000) 9 (Land Allocation - $40,000) 10 (Design and Contingencies - $140,000) 11 (33) SR 1020 over Little Mahoning Creek, 12 Grant Township, Bridge Replacement 257,000 13 (Base Project Allocation - $77,000) 14 (Land Allocation - $40,000) 15 (Design and Contingencies - $140,000) 16 (34) SR 1034 over Little Mahoning Creek, 17 Grant Township, Bridge Replacement 443,000 18 (Base Project Allocation - $263,000) 19 (Land Allocation - $40,000) 20 (Design and Contingencies - $140,000) 21 (35) SR 0240 over South Branch of Two Lick 22 Creek, Green Township, Bridge 23 Replacement 226,000 24 (Base Project Allocation - $46,000) 25 (Land Allocation - $40,000) 26 (Design and Contingencies - $140,000) 27 (36) SR 0286 over North Branch of Two Lick 28 Creek, Green Township, Bridge 29 Replacement 221,000 30 (Base Project Allocation - $41,000) 20080S1503B2474 - 194 -
1 (Land Allocation - $40,000) 2 (Design and Contingencies - $140,000) 3 (37) SR 0403, Bridge No.19136 over 4 Tributary of Dixon Run, Green Township, 5 Bridge Replacement 240,000 6 (Base Project Allocation - $60,000) 7 (Land Allocation - $40,000) 8 (Design and Contingencies - $140,000) 9 (38) SR 0403, Bridge No.19138 over 10 Tributary of Dixon Run, Green Township, 11 Bridge Replacement 323,000 12 (Base Project Allocation - $143,000) 13 (Land Allocation - $40,000) 14 (Design and Contingencies - $140,000) 15 (39) SR 1014 over Whitaker Run, Green 16 Township, Bridge Replacement 259,000 17 (Base Project Allocation - $79,000) 18 (Land Allocation - $40,000) 19 (Design and Contingencies - $140,000) 20 (40) SR 1015 over South Branch of Two Lick 21 Creek, Green Township, Bridge 22 Replacement 235,000 23 (Base Project Allocation - $55,000) 24 (Land Allocation - $40,000) 25 (Design and Contingencies - $140,000) 26 (41) SR 1018 over Tributary of Dixon Run, 27 Green Township, Bridge Replacement 247,000 28 (Base Project Allocation - $67,000) 29 (Land Allocation - $40,000) 30 (Design and Contingencies - $140,000) 20080S1503B2474 - 195 -
1 (42) SR 0286 over Marsh Run, Indiana 2 Borough, Bridge Replacement 280,000 3 (Base Project Allocation - $100,000) 4 (Land Allocation - $40,000) 5 (Design and Contingencies - $140,000) 6 (43) SR 3035 over Stoney Run, Indiana 7 Borough, Bridge Replacement 306,000 8 (Base Project Allocation - $126,000) 9 (Land Allocation - $40,000) 10 (Design and Contingencies - $140,000) 11 (44) SR 4032 over Tributary of Whites Run, 12 Indiana Borough, Bridge Replacement 1,190,000 13 (Base Project Allocation - $540,000) 14 (Land Allocation - $150,000) 15 (Design and Contingencies - $500,000) 16 (45) SR 4032 over Whites Run, Indiana 17 Borough, Bridge Replacement 282,000 18 (Base Project Allocation - $102,000) 19 (Land Allocation - $40,000) 20 (Design and Contingencies - $140,000) 21 (46) SR 0286 over Cush Creek, Montgomery 22 Township, Bridge Replacement 262,000 23 (Base Project Allocation - $82,000) 24 (Land Allocation - $40,000) 25 (Design and Contingencies - $140,000) 26 (47) SR 1015 over Hazelet Run, Montgomery 27 Township, Bridge Replacement 235,000 28 (Base Project Allocation - $55,000) 29 (Land Allocation - $40,000) 30 (Design and Contingencies - $140,000) 20080S1503B2474 - 196 -
1 (48) SR 0210 over Little Mahoning Creek, 2 North Mahoning Township, Bridge 3 Replacement 794,000 4 (Base Project Allocation - $614,000) 5 (Land Allocation - $40,000) 6 (Design and Contingencies - $140,000) 7 (49) SR 0210 over Dutch Run, North 8 Mahoning Township, Bridge Replacement 243,000 9 (Base Project Allocation - $63,000) 10 (Land Allocation - $40,000) 11 (Design and Contingencies - $140,000) 12 (50) SR 0403 over Little Yellow Creek, 13 Pine Township, Bridge Replacement 245,000 14 (Base Project Allocation - $65,000) 15 (Land Allocation - $40,000) 16 (Design and Contingencies - $140,000) 17 (51) SR 1019 over Yellow Creek, Pine 18 Township, Bridge Replacement 221,000 19 (Base Project Allocation - $41,000) 20 (Land Allocation - $40,000) 21 (Design and Contingencies - $140,000) 22 (52) SR 0085 over North Branch of Plum 23 Creek, Plumville Borough, Bridge 24 Replacement 288,000 25 (Base Project Allocation - $108,000) 26 (Land Allocation - $40,000) 27 (Design and Contingencies - $140,000) 28 (53) SR 0110 over Tributary of Mckee Run, 29 Rayne Township, Bridge Replacement 267,000 30 (Base Project Allocation - $87,000) 20080S1503B2474 - 197 -
1 (Land Allocation - $40,000) 2 (Design and Contingencies - $140,000) 3 (54) SR 0286 over Crooked Creek, Rayne 4 Township, Bridge Replacement 278,000 5 (Base Project Allocation - $98,000) 6 (Land Allocation - $40,000) 7 (Design and Contingencies - $140,000) 8 (55) SR 1005 over Brush Run, Rayne 9 Township, Bridge Replacement 239,000 10 (Base Project Allocation - $59,000) 11 (Land Allocation - $40,000) 12 (Design and Contingencies - $140,000) 13 (56) SR 1035 over Tributary of Dixon Run, 14 Rayne Township, Bridge Replacement 236,000 15 (Base Project Allocation - $56,000) 16 (Land Allocation - $40,000) 17 (Design and Contingencies - $140,000) 18 (57) SR 4008 over Tributary of Crooked 19 Creek, Rayne Township, Bridge 20 Replacement 220,000 21 (Base Project Allocation - $150,000) 22 (Design and Contingencies - $70,000) 23 (58) SR 4012 over Tributary of Crooked 24 Creek, Rayne Township, Bridge 25 Replacement 221,000 26 (Base Project Allocation - $41,000) 27 (Land Allocation - $40,000) 28 (Design and Contingencies - $140,000) 29 (59) SR 0286 over Kiskiminetas River, 30 Saltsburg Borough, Bridge 20080S1503B2474 - 198 -
1 Rehabilitation 2,486,000 2 (Base Project Allocation - $2,306,000) 3 (Land Allocation - $40,000) 4 (Design and Contingencies - $140,000) 5 (60) SR 4021 over Condron Run, Smicksburg 6 Borough, Bridge Replacement 342,000 7 (Base Project Allocation - $162,000) 8 (Land Allocation - $40,000) 9 (Design and Contingencies - $140,000) 10 (61) SR 0210 over Ross Run, South Mahoning 11 Township, Bridge Replacement 305,000 12 (Base Project Allocation - $125,000) 13 (Land Allocation - $40,000) 14 (Design and Contingencies - $140,000) 15 (62) SR 0210, Bridge No.19052 over 16 Tributary of Ross Run, South Mahoning 17 Township, Bridge Replacement 251,000 18 (Base Project Allocation - $71,000) 19 (Land Allocation - $40,000) 20 (Design and Contingencies - $140,000) 21 (63) SR 0210, Bridge No.19053 over 22 Tributary of Ross Run, South Mahoning 23 Township, Bridge Replacement 254,000 24 (Base Project Allocation - $74,000) 25 (Land Allocation - $40,000) 26 (Design and Contingencies - $140,000) 27 (64) SR 0954 over North Branch of Plum 28 Creek, South Mahoning Township, Bridge 29 Replacement 235,000 30 (Base Project Allocation - $55,000) 20080S1503B2474 - 199 -
1 (Land Allocation - $40,000) 2 (Design and Contingencies - $140,000) 3 (65) SR 4015 over Goose Run, South 4 Mahoning Township, Bridge Replacement 208,000 5 (Base Project Allocation - $28,000) 6 (Land Allocation - $40,000) 7 (Design and Contingencies - $140,000) 8 (66) SR 4018 over Little Mahoning Creek, 9 South Mahoning Township, Bridge 10 Replacement 677,000 11 (Base Project Allocation - $497,000) 12 (Land Allocation - $40,000) 13 (Design and Contingencies - $140,000) 14 (67) SR 4001 over Mudlick Run, Washington 15 Township, Bridge Replacement 275,000 16 (Base Project Allocation - $95,000) 17 (Land Allocation - $40,000) 18 (Design and Contingencies - $140,000) 19 (68) SR 0259 over West Branch of Richards 20 Run, West Wheatfield Township, Bridge 21 Replacement 333,000 22 (Base Project Allocation - $153,000) 23 (Land Allocation - $40,000) 24 (Design and Contingencies - $140,000) 25 (69) SR 0259, Bridge No.19070 over Ramsey 26 Run, West Wheatfield Township, Bridge 27 Replacement 237,000 28 (Base Project Allocation - $57,000) 29 (Land Allocation - $40,000) 30 (Design and Contingencies - $140,000) 20080S1503B2474 - 200 -
1 (70) SR 0259, Bridge No.19071 over Ramsey 2 Run, West Wheatfield Township, Bridge 3 Replacement 248,000 4 (Base Project Allocation - $68,000) 5 (Land Allocation - $40,000) 6 (Design and Contingencies - $140,000) 7 (71) SR 2008 over Richards Run, West 8 Wheatfield Township, Bridge 9 Replacement 268,000 10 (Base Project Allocation - $88,000) 11 (Land Allocation - $40,000) 12 (Design and Contingencies - $140,000) 13 (72) SR 2011 over Tributary of Conemaugh 14 River, West Wheatfield Township, Bridge 15 Replacement 255,000 16 (Base Project Allocation - $75,000) 17 (Land Allocation - $40,000) 18 (Design and Contingencies - $140,000) 19 (73) SR 0110 over Mckee Run, White 20 Township, Bridge Replacement 278,000 21 (Base Project Allocation - $98,000) 22 (Land Allocation - $40,000) 23 (Design and Contingencies - $140,000) 24 (74) SR 0954 over Fulton Run, White 25 Township, Bridge Replacement 249,000 26 (Base Project Allocation - $69,000) 27 (Land Allocation - $40,000) 28 (Design and Contingencies - $140,000) 29 (75) SR 1002 over Ramsey Run, White 30 Township, Bridge Replacement 339,000 20080S1503B2474 - 201 -
1 (Base Project Allocation - $159,000) 2 (Land Allocation - $40,000) 3 (Design and Contingencies - $140,000) 4 (76) SR 3024 over McCarthy Run, White 5 Township, Bridge Replacement 270,000 6 (Base Project Allocation - $90,000) 7 (Land Allocation - $40,000) 8 (Design and Contingencies - $140,000) 9 (77) SR 4005 over Tributary of Mckee Run, 10 White Township, Bridge Replacement 284,000 11 (Base Project Allocation - $104,000) 12 (Land Allocation - $40,000) 13 (Design and Contingencies - $140,000) 14 (78) SR 4032 over Tributary of McCarthy 15 Run, White Township, Bridge 16 Rehabilitation 1,077,000 17 (Base Project Allocation - $427,000) 18 (Land Allocation - $150,000) 19 (Design and Contingencies - $500,000) 20 (79) SR 0286, Bridge No.19087 over 21 Blacklegs Creek, Young Township, Bridge 22 Replacement 595,000 23 (Base Project Allocation - $415,000) 24 (Land Allocation - $40,000) 25 (Design and Contingencies - $140,000) 26 (80) SR 3021 over Harpers Run, Young 27 Township, Bridge Replacement 275,000 28 (Base Project Allocation - $95,000) 29 (Land Allocation - $40,000) 30 (Design and Contingencies - $140,000) 20080S1503B2474 - 202 -
1 (81) SR 3023 over Whisky Run, Young 2 Township, Bridge Replacement 243,000 3 (Base Project Allocation - $63,000) 4 (Land Allocation - $40,000) 5 (Design and Contingencies - $140,000) 6 (82) SR 3025 over Nesbit Run, Young 7 Township, Bridge Replacement 277,000 8 (Base Project Allocation - $97,000) 9 (Land Allocation - $40,000) 10 (Design and Contingencies - $140,000) 11 (83) SR 3029 over Tributary of Neal Run, 12 Young Township, Bridge Replacement 231,000 13 (Base Project Allocation - $51,000) 14 (Land Allocation - $40,000) 15 (Design and Contingencies - $140,000) 16 (84) SR 3056 over Tributary of Blacklegs 17 Creek, Young Township, Bridge 18 Replacement 228,000 19 (Base Project Allocation - $48,000) 20 (Land Allocation - $40,000) 21 (Design and Contingencies - $140,000) 22 (85) SR 2019, LR 32023, COY NO.1 OVER <-- 23 TRIBUTARY OF TEARING RUN, CENTER 24 TOWNSHIP, BRIDGE REPLACEMENT 259,000 25 (BASE PROJECT ALLOCATION - $169,000) 26 (LAND ALLOCATION - $17,000) 27 (DESIGN AND CONTINGENCIES - $73,000) 28 (86) SR 0422, EASTBOUND, CHESTNUT RIDGE, 29 EASTBOUND OVER T-840, CHESTNUT RIDGE 30 ROAD, CHERRYHILL TOWNSHIP, DECK 20080S1503B2474 - 203 -
1 REHABILITATION 399,000 2 (BASE PROJECT ALLOCATION - $342,000) 3 (DESIGN AND CONTINGENCIES - $57,000) 4 (87) SR 2014, MUDDY RUN BRIDGE NO.2 OVER 5 MUDDY RUN, BLACK LICK TOWNSHIP, BRIDGE 6 REPLACEMENT 196,000 7 (BASE PROJECT ALLOCATION - $133,000) 8 (LAND ALLOCATION - $16,000) 9 (DESIGN AND CONTINGENCIES - $47,000) 10 Section 37. Jefferson County. 11 (a) Local Bridges (Reserved) 12 (b) State Bridges 13 (1) SR 0036 over Canoe Creek, Bell 14 Township, Bridge Replacement 513,000 15 (Base Project Allocation - $333,000) 16 (Land Allocation - $40,000) 17 (Design and Contingencies - $140,000) 18 (2) SR 0119 over Graffius Run, Bell 19 Township, Bridge Replacement 258,000 20 (Base Project Allocation - $78,000) 21 (Land Allocation - $40,000) 22 (Design and Contingencies - $140,000) 23 (3) SR 2011 over Tributary of Canoe Creek, 24 Bell Township, Bridge Replacement 210,000 25 (Base Project Allocation - $30,000) 26 (Land Allocation - $40,000) 27 (Design and Contingencies - $140,000) 28 (4) SR 2003 over Mahoning Creek, Big Run 29 Borough, Bridge Replacement 770,000 30 (Base Project Allocation - $590,000) 20080S1503B2474 - 204 -
1 (Land Allocation - $40,000) 2 (Design and Contingencies - $140,000) 3 (5) SR 3003 over Coder Run, Clover 4 Township, Bridge Replacement 285,000 5 (Base Project Allocation - $105,000) 6 (Land Allocation - $40,000) 7 (Design and Contingencies - $140,000) 8 (6) SR 0949, Bridge No.19666 over Mill 9 Run, Eldred Township, Bridge 10 Replacement 221,000 11 (Base Project Allocation - $41,000) 12 (Land Allocation - $40,000) 13 (Design and Contingencies - $140,000) 14 (7) SR 0949, Bridge No.19667 over Mill 15 Run, Eldred Township, Bridge 16 Replacement 228,000 17 (Base Project Allocation - $48,000) 18 (Land Allocation - $40,000) 19 (Design and Contingencies - $140,000) 20 (8) SR 4006 over Red Lick Run, Eldred 21 Township, Bridge Rehabilitation 222,000 22 (Base Project Allocation - $42,000) 23 (Land Allocation - $40,000) 24 (Design and Contingencies - $140,000) 25 (9) SR 2007 over Lost Run, Gaskill 26 Township, Bridge Replacement 211,000 27 (Base Project Allocation - $31,000) 28 (Land Allocation - $40,000) 29 (Design and Contingencies - $140,000) 30 (10) SR 0949 over Pine Run, Heath 20080S1503B2474 - 205 -
1 Township, Bridge Replacement 232,000 2 (Base Project Allocation - $52,000) 3 (Land Allocation - $40,000) 4 (Design and Contingencies - $140,000) 5 (11) SR 0949 over Callen Run, Heath 6 Township, Bridge Replacement 290,000 7 (Base Project Allocation - $110,000) 8 (Land Allocation - $40,000) 9 (Design and Contingencies - $140,000) 10 (12) SR 0410 over Stump Creek, Henderson 11 Township, Bridge Replacement 534,000 12 (Base Project Allocation - $354,000) 13 (Land Allocation - $40,000) 14 (Design and Contingencies - $140,000) 15 (13) SR 2007 over Mckee Run, Henderson 16 Township, Bridge Replacement 235,000 17 (Base Project Allocation - $150,000) 18 (Land Allocation - $15,000) 19 (Design and Contingencies - $70,000) 20 (14) SR 3039 over Five Mile Run, Knox 21 Township, Bridge Replacement 240,000 22 (Base Project Allocation - $150,000) 23 (Land Allocation - $20,000) 24 (Design and Contingencies - $70,000) 25 (15) SR 3014 over Branch of Big Run, 26 Oliver Township, Bridge Replacement 251,000 27 (Base Project Allocation - $71,000) 28 (Land Allocation - $40,000) 29 (Design and Contingencies - $140,000) 30 (16) SR 3031 over Branch of Little Sandy 20080S1503B2474 - 206 -
1 Creek, Oliver Township, Bridge 2 Replacement 227,000 3 (Base Project Allocation - $47,000) 4 (Land Allocation - $40,000) 5 (Design and Contingencies - $140,000) 6 (17) SR 3008 over Rose Run, Perry 7 Township, Bridge Replacement 382,000 8 (Base Project Allocation - $202,000) 9 (Land Allocation - $40,000) 10 (Design and Contingencies - $140,000) 11 (18) SR 3013 over Dutch Run, Perry 12 Township, Bridge Replacement 223,000 13 (Base Project Allocation - $43,000) 14 (Land Allocation - $40,000) 15 (Design and Contingencies - $140,000) 16 (19) SR 4005 over Hetrick Run, Polk 17 Township, Bridge Rehabilitation 215,000 18 (Base Project Allocation - $35,000) 19 (Land Allocation - $40,000) 20 (Design and Contingencies - $140,000) 21 (20) LR 33001 over Nye Branch Stream, 22 Porter Township, Bridge Replacement 243,000 23 (Base Project Allocation - $63,000) 24 (Land Allocation - $40,000) 25 (Design and Contingencies - $140,000) 26 (21) LR 33001 over Pine Run, Ringgold 27 Township, Bridge Replacement 312,000 28 (Base Project Allocation - $132,000) 29 (Land Allocation - $40,000) 30 (Design and Contingencies - $140,000) 20080S1503B2474 - 207 -
1 (22) LR 33003 over Cherry Run, Ringgold 2 Township, Bridge Replacement 264,000 3 (Base Project Allocation - $84,000) 4 (Land Allocation - $40,000) 5 (Design and Contingencies - $140,000) 6 (23) SR 0536 over Milliron Run, Ringgold 7 Township, Bridge Replacement 249,000 8 (Base Project Allocation - $69,000) 9 (Land Allocation - $40,000) 10 (Design and Contingencies - $140,000) 11 (24) SR 0219 over Tributary of Little Toby 12 Creek, Snyder Township, Bridge 13 Replacement 279,000 14 (Base Project Allocation - $99,000) 15 (Land Allocation - $40,000) 16 (Design and Contingencies - $140,000) 17 (25) SR 1008 over Tributary of Rattlesnake 18 Creek, Snyder Township, Bridge 19 Replacement 223,000 20 (Base Project Allocation - $43,000) 21 (Land Allocation - $40,000) 22 (Design and Contingencies - $140,000) 23 (26) SR 0322 over Tributary of Coder Run, 24 Union Township, Bridge Replacement 216,000 25 (Base Project Allocation - $36,000) 26 (Land Allocation - $40,000) 27 (Design and Contingencies - $140,000) 28 (27) SR 4001 over Mill Creek, Union 29 Township, Bridge Replacement 405,000 30 (Base Project Allocation - $225,000) 20080S1503B2474 - 208 -
1 (Land Allocation - $40,000) 2 (Design and Contingencies - $140,000) 3 (28) SR 0830 over Beaverdam Run, 4 Washington Township, Bridge 5 Replacement 369,000 6 (Base Project Allocation - $189,000) 7 (Land Allocation - $40,000) 8 (Design and Contingencies - $140,000) 9 (29) SR 0950 over Tributary to Sandy Lick 10 Creek, Winslow Township, Bridge 11 Replacement 240,000 12 (Base Project Allocation - $60,000) 13 (Land Allocation - $40,000) 14 (Design and Contingencies - $140,000) 15 (30) SR 2007 over McCreight Run, Winslow 16 Township, Bridge Replacement 239,000 17 (Base Project Allocation - $59,000) 18 (Land Allocation - $40,000) 19 (Design and Contingencies - $140,000) 20 (31) SR 2010 over Trout Run, Winslow 21 Township, Bridge Rehabilitation 135,000 22 (Base Project Allocation - $75,000) 23 (Design and Contingencies - $60,000) 24 (32) SR 3021 over Sawmill Run, Young 25 Township, Bridge Replacement 245,000 26 (Base Project Allocation - $65,000) 27 (Land Allocation - $40,000) 28 (Design and Contingencies - $140,000) 29 (33) SR 1002 OVER WHEELER RUN, WINSLOW <-- 30 TOWNSHIP, BRIDGE REPLACEMENT 91,000 20080S1503B2474 - 209 -
1 (BASE PROJECT ALLOCATION - $61,000) 2 (LAND ALLOCATION - $8,000) 3 (DESIGN AND CONTINGENCIES - $22,000) 4 (34) SR 1009 OVER KYLE RUN, WASHINGTON 5 TOWNSHIP, BRIDGE REPLACEMENT 163,000 6 (BASE PROJECT ALLOCATION - $110,000) 7 (LAND ALLOCATION - $14,000) 8 (DESIGN AND CONTINGENCIES - $39,000) 9 (35) SR 3014 OVER BIG RUN, OLIVER 10 TOWNSHIP, BRIDGE REPLACEMENT 166,000 11 (BASE PROJECT ALLOCATION - $112,000) 12 (LAND ALLOCATION - $14,000) 13 (DESIGN AND CONTINGENCIES - $40,000) 14 (36) SR 0322, CAMPBELL RUN BRIDGE NO.1 15 OVER CAMPBELL RUN, ROSE TOWNSHIP, 16 BRIDGE REPLACEMENT 164,000 17 (BASE PROJECT ALLOCATION - $111,000) 18 (LAND ALLOCATION - $14,000) 19 (DESIGN AND CONTINGENCIES - $39,000) 20 (37) SR 3021 OVER SAWMILL RUN, YOUNG 21 TOWNSHIP, BRIDGE REPLACEMENT 173,000 22 (BASE PROJECT ALLOCATION - $156,000) 23 (LAND ALLOCATION - $17,000) 24 Section 38. Juniata County. 25 (a) Local Bridges (Reserved) 26 (b) State Bridges 27 (1) SR 0035 over Cocolamus Creek, Fayette 28 Township, Bridge Replacement 3,225,000 29 (Base Project Allocation - $2,500,000) 30 (Land Allocation - $125,000) 20080S1503B2474 - 210 -
1 (Design and Contingencies - $600,000) 2 (2) SR 2017 over Dutchman Run, Greenwood 3 Township, Bridge Rehabilitation 220,000 4 (Base Project Allocation - $140,000) 5 (Land Allocation - $30,000) 6 (Design and Contingencies - $50,000) 7 (3) SR 0075 over Tuscarora Creek, Lack 8 Township, Bridge Replacement 1,600,000 9 (Base Project Allocation - $1,000,000) 10 (Land Allocation - $300,000) 11 (Design and Contingencies - $300,000) 12 (4) SR 0035 over Tributary of Cocolamus 13 Creek, Monroe Township, Bridge 14 Replacement 1,475,000 15 (Base Project Allocation - $850,000) 16 (Land Allocation - $125,000) 17 (Design and Contingencies - $500,000) 18 (5) SR 2022 over Mahantango Creek, Monroe 19 Township, Bridge Rehabilitation 1,150,000 20 (Base Project Allocation - $600,000) 21 (Land Allocation - $100,000) 22 (Design and Contingencies - $450,000) 23 (6) SR 2023 over Dobson Run, Susquehanna 24 Township, Bridge Replacement 275,000 25 (Base Project Allocation - $200,000) 26 (Design and Contingencies - $75,000) 27 (7) SR 0333 over Tributary of Hunters 28 Creek, Turbett Township, Bridge 29 Replacement 300,000 30 (Base Project Allocation - $200,000) 20080S1503B2474 - 211 -
1 (Design and Contingencies - $100,000) 2 (8) SR 3018 over Union Run, Tuscarora 3 Township, Bridge Replacement 250,000 4 (Base Project Allocation - $150,000) 5 (Land Allocation - $100,000) 6 (9) SR 0035 OVER TRIBUTARY OF MARKEE <-- 7 CREEK, BEALE TOWNSHIP, BRIDGE 8 REPLACEMENT 392,000 9 (BASE PROJECT ALLOCATION - $248,000) 10 (LAND ALLOCATION - $20,000) 11 (DESIGN AND CONTINGENCIES - $124,000) 12 (10) SR 0035 OVER TRIBUTARY OF LICK RUN, 13 LACK TOWNSHIP, BRIDGE REPLACEMENT 64,000 14 (BASE PROJECT ALLOCATION - $29,000) 15 (LAND ALLOCATION - $20,000) 16 (DESIGN AND CONTINGENCIES - $15,000) 17 (11) SR 0035 OVER WILLOW RUN, LACK 18 TOWNSHIP, BRIDGE REPLACEMENT 68,000 19 (BASE PROJECT ALLOCATION - $32,000) 20 (LAND ALLOCATION - $20,000) 21 (DESIGN AND CONTINGENCIES - $16,000) 22 (12) SR 0035 OVER TRIBUTARY OF WILLOW RUN, 23 LACK TOWNSHIP, BRIDGE REPLACEMENT 64,000 24 (BASE PROJECT ALLOCATION - $29,000) 25 (LAND ALLOCATION - $20,000) 26 (DESIGN AND CONTINGENCIES - $15,000) 27 (13) SR 0035 OVER EAST LICKING CREEK, 28 MILFORD TOWNSHIP, BRIDGE REPLACEMENT 392,000 29 (BASE PROJECT ALLOCATION - $248,000) 30 (LAND ALLOCATION - $20,000) 20080S1503B2474 - 212 -
1 (DESIGN AND CONTINGENCIES - $124,000) 2 (14) SR 0035, BRIDGE NO.19994 OVER 3 TRIBUTARY OF COCOLAMUS CREEK, FAYETTE 4 TOWNSHIP, BRIDGE REHABILITATION 92,000 5 (BASE PROJECT ALLOCATION - $48,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $24,000) 8 (15) SR 0035, BRIDGE NO.19996 OVER 9 COCOLAMUS CREEK, FAYETTE TOWNSHIP, 10 BRIDGE REPLACEMENT 380,000 11 (BASE PROJECT ALLOCATION - $240,000) 12 (LAND ALLOCATION - $20,000) 13 (DESIGN AND CONTINGENCIES - $120,000) 14 (16) SR 0035, BRIDGE NO.19997 OVER 15 COCOLAMUS CREEK, FAYETTE TOWNSHIP, 16 BRIDGE REPLACEMENT 80,000 17 (BASE PROJECT ALLOCATION - $40,000) 18 (LAND ALLOCATION - $20,000) 19 (DESIGN AND CONTINGENCIES - $20,000) 20 (17) SR 0035, BRIDGE NO.19999 OVER 21 TRIBUTARY OF COCOLAMUS CREEK, MONROE 22 TOWNSHIP, BRIDGE REPLACEMENT 131,000 23 (BASE PROJECT ALLOCATION - $74,000) 24 (LAND ALLOCATION - $20,000) 25 (DESIGN AND CONTINGENCIES - $37,000) 26 (18) SR 0075 OVER TUSCARORA CREEK, LACK 27 TOWNSHIP, BRIDGE REHABILITATION 164,000 28 (BASE PROJECT ALLOCATION - $96,000) 29 (LAND ALLOCATION - $20,000) 30 (DESIGN AND CONTINGENCIES - $48,000) 20080S1503B2474 - 213 -
1 (19) SR 0075 OVER TRIBUTARY OF TUSCARORA 2 CREEK, LACK TOWNSHIP, BRIDGE 3 REPLACEMENT 58,000 4 (BASE PROJECT ALLOCATION - $30,000) 5 (LAND ALLOCATION - $20,000) 6 (DESIGN AND CONTINGENCIES - $8,000) 7 (20) SR 0075 OVER TRIBUTARY OF TUSCARORA 8 CREEK, TUSCARORA TOWNSHIP, BRIDGE 9 REPLACEMENT 62,000 10 (BASE PROJECT ALLOCATION - $28,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $14,000) 13 (21) SR 0075, BRIDGE NO.20022 OVER 14 TRIBUTARY OF TUSCARORA CREEK, TUSCARORA 15 TOWNSHIP, BRIDGE REPLACEMENT 61,000 16 (BASE PROJECT ALLOCATION - $27,000) 17 (LAND ALLOCATION - $20,000) 18 (DESIGN AND CONTINGENCIES - $14,000) 19 (22) SR 0075, BRIDGE NO.20024 OVER 20 TRIBUTARY OF TUSCARORA CREEK, TUSCARORA 21 TOWNSHIP, BRIDGE REPLACEMENT 63,000 22 (BASE PROJECT ALLOCATION - $30,000) 23 (LAND ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $13,000) 25 (23) SR 0075, BRIDGE NO.20033 OVER 26 TRIBUTARY OF TUSCARORA CREEK, SPRUCE 27 HILL TOWNSHIP, BRIDGE REPLACEMENT 82,000 28 (BASE PROJECT ALLOCATION - $41,000) 29 (LAND ALLOCATION - $20,000) 30 (DESIGN AND CONTINGENCIES - $21,000) 20080S1503B2474 - 214 -
1 (24) SR 0235 OVER TRIBUTARY OF LOST CREEK, 2 FAYETTE TOWNSHIP, BRIDGE REPLACEMENT 60,000 3 (BASE PROJECT ALLOCATION - $30,000) 4 (LAND ALLOCATION - $20,000) 5 (DESIGN AND CONTINGENCIES - $10,000) 6 (25) SR 0333 OVER DELAWARE CREEK, 7 THOMPSONTOWN BOROUGH, BRIDGE 8 REHABILITATION 300,000 9 (BASE PROJECT ALLOCATION - $250,000) 10 (LAND ALLOCATION - $50,000) 11 (26) SR 0333 OVER TRIBUTARY OF HUNTERS 12 CREEK, TURBETT TOWNSHIP, BRIDGE 13 REPLACEMENT 165,000 14 (BASE PROJECT ALLOCATION - $165,000) 15 (27) SR 0333, BRIDGE NO.20064 OVER 16 TRIBUTARY OF JUNIATA RIVER, MILFORD 17 TOWNSHIP, BRIDGE REPLACEMENT 55,000 18 (BASE PROJECT ALLOCATION - $23,000) 19 (LAND ALLOCATION - $20,000) 20 (DESIGN AND CONTINGENCIES - $12,000) 21 (28) SR 0333, BRIDGE NO.20065 OVER 22 TRIBUTARY OF JUNIATA RIVER, MIFFLIN 23 BOROUGH, BRIDGE REPLACEMENT 50,000 24 (BASE PROJECT ALLOCATION - $20,000) 25 (LAND ALLOCATION - $20,000) 26 (DESIGN AND CONTINGENCIES - $10,000) 27 (29) SR 0333, BRIDGE NO.20077 OVER 28 TRIBUTARY OF JUNIATA RIVER, TURBETT 29 TOWNSHIP, BRIDGE REPLACEMENT 62,000 30 (BASE PROJECT ALLOCATION - $28,000) 20080S1503B2474 - 215 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $14,000) 3 (30) SR 0850 OVER WILLOW RUN, TUSCARORA 4 TOWNSHIP, BRIDGE REPLACEMENT 226,000 5 (BASE PROJECT ALLOCATION - $137,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $69,000) 8 (31) SR 0850 OVER TRIBUTARY OF TUSCARORA 9 CREEK, TUSCARORA TOWNSHIP, BRIDGE 10 REPLACEMENT 89,000 11 (BASE PROJECT ALLOCATION - $46,000) 12 (LAND ALLOCATION - $20,000) 13 (DESIGN AND CONTINGENCIES - $23,000) 14 (32) SR 1002 OVER TRIBUTARY OF LOST CREEK, 15 FERMANAGH TOWNSHIP, BRIDGE REPLACEMENT 47,000 16 (BASE PROJECT ALLOCATION - $18,000) 17 (LAND ALLOCATION - $20,000) 18 (DESIGN AND CONTINGENCIES - $9,000) 19 (33) SR 1002, BRIDGE NO.20110 OVER BIG 20 RUN, FERMANAGH TOWNSHIP, BRIDGE 21 REPLACEMENT 193,000 22 (BASE PROJECT ALLOCATION - $115,000) 23 (LAND ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $58,000) 25 (34) SR 2002 OVER TRIBUTARY OF DOE RUN, 26 WALKER TOWNSHIP, BRIDGE REPLACEMENT 50,000 27 (BASE PROJECT ALLOCATION - $20,000) 28 (LAND ALLOCATION - $20,000) 29 (DESIGN AND CONTINGENCIES - $10,000) 30 (35) SR 2007 OVER DOE RUN, WALKER 20080S1503B2474 - 216 -
1 TOWNSHIP, BRIDGE REPLACEMENT 79,000 2 (BASE PROJECT ALLOCATION - $39,000) 3 (LAND ALLOCATION - $20,000) 4 (DESIGN AND CONTINGENCIES - $20,000) 5 (36) SR 2017 OVER DUTCHMAN RUN, GREENWOOD 6 TOWNSHIP, BRIDGE REHABILITATION 71,000 7 (BASE PROJECT ALLOCATION - $34,000) 8 (LAND ALLOCATION - $20,000) 9 (DESIGN AND CONTINGENCIES - $17,000) 10 (37) SR 2019 OVER CABALA RUN, GREENWOOD 11 TOWNSHIP, BRIDGE REPLACEMENT 79,000 12 (BASE PROJECT ALLOCATION - $39,000) 13 (LAND ALLOCATION - $20,000) 14 (DESIGN AND CONTINGENCIES - $20,000) 15 (38) SR 2023 OVER DOBSON RUN, SUSQUEHANNA 16 TOWNSHIP, BRIDGE REPLACEMENT 238,000 17 (BASE PROJECT ALLOCATION - $150,000) 18 (DESIGN AND CONTINGENCIES - $88,000) 19 (39) SR 2023 OVER MAHANTANGO CREEK, 20 SUSQUEHANNA TOWNSHIP, BRIDGE 21 REPLACEMENT 137,000 22 (BASE PROJECT ALLOCATION - $78,000) 23 (LAND ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $39,000) 25 (40) SR 3002 OVER TRIBUTARY OF JUNIATA 26 RIVER, WALKER TOWNSHIP, BRIDGE 27 REPLACEMENT 94,000 28 (BASE PROJECT ALLOCATION - $49,000) 29 (LAND ALLOCATION - $20,000) 30 (DESIGN AND CONTINGENCIES - $25,000) 20080S1503B2474 - 217 -
1 (41) SR 3002 OVER LOCUST RUN, WALKER 2 TOWNSHIP, BRIDGE REPLACEMENT 101,000 3 (BASE PROJECT ALLOCATION - $54,000) 4 (LAND ALLOCATION - $20,000) 5 (DESIGN AND CONTINGENCIES - $27,000) 6 (42) SR 3013 OVER TRIBUTARY OF TUSCARORA 7 CREEK, BEALE TOWNSHIP, BRIDGE 8 REPLACEMENT 61,000 9 (BASE PROJECT ALLOCATION - $27,000) 10 (LAND ALLOCATION - $20,000) 11 (DESIGN AND CONTINGENCIES - $14,000) 12 (43) SR 3016 OVER MCKINLEY RUN, TUSCARORA 13 TOWNSHIP, BRIDGE REPLACEMENT 68,000 14 (BASE PROJECT ALLOCATION - $32,000) 15 (LAND ALLOCATION - $20,000) 16 (DESIGN AND CONTINGENCIES - $16,000) 17 (44) SR 3017 OVER MARKEE CREEK, BEALE 18 TOWNSHIP, BRIDGE REPLACEMENT 56,000 19 (BASE PROJECT ALLOCATION - $24,000) 20 (LAND ALLOCATION - $20,000) 21 (DESIGN AND CONTINGENCIES - $12,000) 22 (45) SR 3018 OVER UNION RUN, TUSCARORA 23 TOWNSHIP, BRIDGE REPLACEMENT 61,000 24 (BASE PROJECT ALLOCATION - $27,000) 25 (LAND ALLOCATION - $20,000) 26 (DESIGN AND CONTINGENCIES - $14,000) 27 (46) SR 3021 OVER TRIBUTARY OF TUSCARORA 28 CREEK, TUSCARORA TOWNSHIP, BRIDGE 29 REPLACEMENT 43,000 30 (BASE PROJECT ALLOCATION - $15,000) 20080S1503B2474 - 218 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $8,000) 3 (47) SR 3023 OVER TUSCARORA CREEK, LACK 4 TOWNSHIP, BRIDGE REPLACEMENT 395,000 5 (BASE PROJECT ALLOCATION - $250,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $125,000) 8 (48) SR 4005 OVER BLACK LOG CREEK, LACK 9 TOWNSHIP, BRIDGE REPLACEMENT 73,000 10 (BASE PROJECT ALLOCATION - $35,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $18,000) 13 (49) SR 2017 OVER STONY RUN, GREENWOOD 14 TOWNSHIP, BRIDGE REHABILITATION 300,000 15 (BASE PROJECT ALLOCATION - $200,000) 16 (LAND ALLOCATION - $100,000) 17 (50) SR 2017 OVER COCOLAMUS CREEK, 18 GREENWOOD TOWNSHIP, BRIDGE 19 REHABILITATION 377,000 20 (BASE PROJECT ALLOCATION - $327,000) 21 (LAND ALLOCATION - $50,000) 22 Section 39. Lackawanna County. 23 Local Bridges 24 (1) City of Scranton, Parker Street over 25 Lackawanna River, Bridge Replacement 313,000 26 (Base Project Allocation - $184,000) 27 (Design and Contingencies - $129,000) 28 (2) Moosic Borough, County-owned Railroad 29 over Spring Brook Creek, Bridge 30 Rehabilitation 385,000 20080S1503B2474 - 219 -
1 (Base Project Allocation - $350,000)
2 (Design and Contingencies - $35,000)
3 (3) Moosic Borough, County-owned Railroad
4 over Route 502, Bridge Rehabilitation 60,000
5 (Base Project Allocation - $54,000)
6 (Design and Contingencies - $6,000)
7 (b) State Bridges
8 (1) SR 0435 over Van Brunt Creek, Moscow
9 Borough, Bridge Rehabilitation 121,000
10 (Base Project Allocation - $83,000)
11 (Land Allocation - $9,000)
12 (Design and Contingencies - $29,000)
13 (2) Various Routes over Lackawanna and
14 Luzerne Counties, Various Townships,
15 Bridge Rehabilitation 10,080,000
16 (Base Project Allocation - $8,000,000)
17 (Design and Contingencies - $2,080,000)
18 Section 40. Lancaster County.
19 (a) Local Bridges (Reserved) <--
20 (A) LOCAL BRIDGES <--
21 (1) LITITZ BOROUGH, NORTH LOCUST BRIDGE
22 OVER SANTO DOMINGO CREEK, BRIDGE
23 REPLACEMENT 550,000
24 (BASE PROJECT ALLOCATION - $550,000)
25 (2) LITITZ BOROUGH, NORTH CEDAR STREET
26 BRIDGE OVER LITITZ RUN, BRIDGE
27 REPLACEMENT 550,000
28 (BASE PROJECT ALLOCATION - $550,000)
29 (3) LITITZ BOROUGH, NORTH CEDAR STREET
30 BRIDGE OVER SANTO DOMINGO CREEK, BRIDGE
20080S1503B2474 - 220 -
1 REPLACEMENT 550,000 2 (BASE PROJECT ALLOCATION - $550,000) 3 (4) LITITZ BOROUGH, EAST LINCOLN AVENUE 4 BRIDGE OVER SANTO DOMINGO CREEK, BRIDGE 5 REPLACEMENT 550,000 6 (BASE PROJECT ALLOCATION - $550,000) 7 (5) LITTLE BRITAIN TOWNSHIP, BALANCE MILL 8 AND CAMP ROADS OVER MCCREARY RUN, 9 BRIDGE REPLACEMENT 226,000 10 (BASE PROJECT ALLOCATION - $226,000) 11 (b) State Bridges 12 (1) SR 2014 over Ball Run, Colerain 13 Township, Bridge Replacement 1,046,000 14 (Base Project Allocation - $719,000) 15 (Land Allocation - $40,000) 16 (Design and Contingencies - $287,000) 17 (2) US 222 Northbound over SR 1051, Church 18 Street, East Cocalico Township, Bridge 19 Rehabilitation 4,340,000 20 (Base Project Allocation - $2,065,000) 21 (Design and Contingencies - $2,275,000) 22 (3) US 222 Southbound over SR 1051, Church 23 Street, East Cocalico Township, Bridge 24 Rehabilitation 4,340,000 25 (Base Project Allocation - $2,065,000) 26 (Design and Contingencies - $2,275,000) 27 (4) SR 4017, Bridge No.21711 over Wet 28 Weather Stream, East Donegal Township, 29 Bridge Replacement 100,000 30 (Base Project Allocation - $100,000) 20080S1503B2474 - 221 -
1 (5) PA 896 over Mill Creek, East Lampeter 2 Township, Bridge Rehabilitation 2,515,000 3 (Base Project Allocation - $1,115,000) 4 (Design and Contingencies - $140,000) 5 (6) SR 3028, Pitney Road over AMTRAK, East 6 Lampeter Township, Bridge 7 Rehabilitation 1,500,000 8 (Base Project Allocation - $1,500,000) 9 (7) SR 1026 over Seelock Run, Elizabeth 10 Township, Bridge Replacement 930,000 11 (Base Project Allocation - $600,000) 12 (Land Allocation - $40,000) 13 (Design and Contingencies - $290,000) 14 (8) SR 0272, North Reading Road over 15 Cocalico Creek, Ephrata Borough, Bridge 16 Replacement 2,630,000 17 (Base Project Allocation - $2,500,000) 18 (Land Allocation - $30,000) 19 (Design and Contingencies - $100,000) 20 (9) SR 1039, Meadow Valley over Hammer 21 Creek, Ephrata Township, Bridge 22 Rehabilitation 1,000,000 23 (Base Project Allocation - $1,000,000) 24 (10) SR 0272, North Reading Drive over 25 Abandoned Norfolk Southern Railroad, 26 Ephrata Township, Bridge Removal 1,000,000 27 (Base Project Allocation - $1,000,000) 28 (11) SR 0743, Hershey Road over Conewago 29 Creek, Mt. Joy Township, Bridge 30 Replacement 730,000 20080S1503B2474 - 222 -
1 (Base Project Allocation - $200,000) 2 (Land Allocation - $30,000) 3 (Design and Contingencies - $500,000) 4 (12) SR 3022 over Tributary of Stehman 5 Run, Pequea Township, Bridge 6 Replacement 100,000 7 (Base Project Allocation - $100,000) 8 (13) SR 4033, Meadowview Road over 9 Brubaker Run, Rapho Township, Bridge 10 Rehabilitation 430,000 11 (Base Project Allocation - $300,000) 12 (Land Allocation - $30,000) 13 (Design and Contingencies - $100,000) 14 (14) SR 4027 over Tributary of Brubakers 15 Run, Rapho Township, Bridge 16 Replacement 948,000 17 (Base Project Allocation - $600,000) 18 (Land Allocation - $40,000) 19 (Design and Contingencies - $308,000) 20 (15) SR 2022 over Tributary of Beaver 21 Creek, Strasburg Township, Bridge 22 Replacement 665,000 23 (Base Project Allocation - $400,000) 24 (Land Allocation - $40,000) 25 (Design and Contingencies - $225,000) 26 (16) SR 1039, Briar Hill over Tributary of 27 Hammer Creek, Warwick Township, Bridge 28 Replacement 100,000 29 (Base Project Allocation - $100,000) 30 (17) SR 0222, Beaver Valley Pike over Big 20080S1503B2474 - 223 -
1 Spring Run, West Lampeter Township,
2 Bridge Replacement 2,500,000
3 (Base Project Allocation - $2,500,000)
4 (18) EBY CHIQUES ROAD, T-347 OVER AMTRAK <--
5 RAILROAD, RAPHO TOWNSHIP, NEW BRIDGE
6 CONSTRUCTION 1,556,000
7 (BASE PROJECT ALLOCATION - $1,556,000)
8 Section 41. Lawrence County.
9 (a) Local Bridges (Reserved) <--
10 (A) LOCAL BRIDGES <--
11 (1) HICKORY TOWNSHIP, T-533, RODGERS ROAD
12 OVER CLOSED STRUCTURE, BRIDGE
13 REHABILITATION 208,000
14 (DESIGN AND CONTINGENCIES - $208,000)
15 (b) State Bridges
16 (1) SR 0317, East Poland Avenue over
17 Hickory Run, Bessemer Borough, Bridge
18 Rehabilitation 233,000
19 (Base Project Allocation - $213,000)
20 (Design and Contingencies - $20,000)
21 (2) SR 0018, Frankfort Road over Big Run,
22 City of New Castle, Bridge Replacement 256,000
23 (Base Project Allocation - $200,000)
24 (Land Allocation - $15,000)
25 (Design and Contingencies - $41,000)
26 (3) SR 0018, Liberty Street over Mahoning
27 River, City of New Castle, Bridge
28 Rehabilitation 2,177,000
29 (Base Project Allocation - $1,925,000)
30 (Land Allocation - $7,000)
20080S1503B2474 - 224 -
1 (Design and Contingencies - $245,000) 2 (4) SR 0065, Second Street over Buffalo 3 and Pittsburgh Railroad, Ellwood City 4 Borough, Bridge Replacement 387,000 5 (Base Project Allocation - $300,000) 6 (Land Allocation - $15,000) 7 (Design and Contingencies - $72,000) 8 (5) SR 0168, Eastbrook Road over Small 9 Stream, Hickory Township, Bridge 10 Rehabilitation 601,000 11 (Base Project Allocation - $200,000) 12 (Land Allocation - $63,000) 13 (Design and Contingencies - $338,000) 14 (6) SR 1002, Maitland Lane over Neshannock 15 Creek, Hickory Township, Bridge 16 Rehabilitation 280,000 17 (Base Project Allocation - $200,000) 18 (Land Allocation - $40,000) 19 (Design and Contingencies - $40,000) 20 (7) SR 0551, Main Street over Little 21 Beaver Creek, Little Beaver Township, 22 Bridge Replacement 387,000 23 (Base Project Allocation - $300,000) 24 (Land Allocation - $15,000) 25 (Design and Contingencies - $72,000) 26 (8) SR 0351, Petersburg Road over North 27 Fork Little Beaver, Little Beaver 28 Township, Bridge Replacement 256,000 29 (Base Project Allocation - $200,000) 30 (Land Allocation - $15,000) 20080S1503B2474 - 225 -
1 (Design and Contingencies - $41,000) 2 (9) SR 3011 over North Fork Little Beaver, 3 Little Beaver Township, Bridge 4 Rehabilitation 150,000 5 (Base Project Allocation - $120,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $20,000) 8 (10) SR 4006, Sky Hill Road over Coffee 9 Run, Mahoning Township, Bridge 10 Replacement 387,000 11 (Base Project Allocation - $300,000) 12 (Land Allocation - $15,000) 13 (Design and Contingencies - $72,000) 14 (11) SR 4005, Pulaski Road over Camp Run, 15 Neshannock Township, Bridge 16 Rehabilitation 233,000 17 (Base Project Allocation - $213,000) 18 (Design and Contingencies - $20,000) 19 (12) SR 0551 over Deer Creek, Pulaski 20 Township, Bridge Replacement 387,000 21 (Base Project Allocation - $300,000) 22 (Land Allocation - $15,000) 23 (Design and Contingencies - $72,000) 24 (13) SR 0108, Cronton Avenue over Taylor 25 Run, Scott Township, Bridge 26 Replacement 256,000 27 (Base Project Allocation - $200,000) 28 (Land Allocation - $15,000) 29 (Design and Contingencies - $41,000) 30 (14) SR 0388, State Road over Big Run, 20080S1503B2474 - 226 -
1 Shenango Township, Bridge
2 Rehabilitation 233,000
3 (Base Project Allocation - $213,000)
4 (Design and Contingencies - $20,000)
5 (15) SR 2028, Hells Hollow over Hell Run,
6 Slippery Rock Township, Bridge
7 Rehabilitation 233,000
8 (Base Project Allocation - $213,000)
9 (Design and Contingencies - $20,000)
10 (16) SR 0208, Market Street over
11 Neshannock Creek, Wampum Borough,
12 Bridge Rehabilitation 1,632,000
13 (Base Project Allocation - $1,442,000)
14 (Land Allocation - $6,000)
15 (Design and Contingencies - $184,000)
16 (17) SR 0288, Main Street over Tributary
17 of Beaver River, Wayne Township, Bridge
18 Rehabilitation 601,000
19 (Base Project Allocation - $200,000)
20 (Land Allocation - $63,000)
21 (Design and Contingencies - $338,000)
22 (18) SR 2005 over Slippery Rock Creek,
23 Wayne Township, Bridge Replacement 3,500,000
24 (Base Project Allocation - $3,500,000)
25 Section 42. Lebanon County.
26 (a) Local Bridges (Reserved) <--
27 (A) LOCAL BRIDGES <--
28 (1) CITY OF LEBANON, 9TH AND 10TH STREETS,
29 TWO BRIDGES FROM QUITATAPAHILLA CREEK
30 TO CHURCH STREET, BRIDGE CONSTRUCTION 5,001,000
20080S1503B2474 - 227 -
1 (BASE PROJECT ALLOCATION - $5,001,000) 2 (b) State Bridges 3 (1) SR 0422, US 422 over Storm Drain, 4 Annville Township, Bridge Replacement 849,000 5 (Base Project Allocation - $599,000) 6 (Land Allocation - $50,000) 7 (Design and Contingencies - $200,000) 8 (2) US 322 over Railroad (Removed), 9 Cornwall Borough, Bridge 10 Rehabilitation 370,000 11 (Base Project Allocation - $300,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $50,000) 14 (3) US 322 over SR 0117, Abandoned 15 Railroad, Cornwall Borough, Bridge 16 Rehabilitation 370,000 17 (Base Project Allocation - $300,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $50,000) 20 (4) SR 0443, Asher Miner over Indiantown 21 Run, East Hanover Township, Bridge 22 Replacement 420,000 23 (Base Project Allocation - $300,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $100,000) 26 (5) SR 4018, Boundary Road over Indiantown 27 Run, East Hanover Township, Bridge 28 Rehabilitation 750,000 29 (Base Project Allocation - $750,000) 30 (6) SR 0443, Clement Avenue over 20080S1503B2474 - 228 -
1 Indiantown Run, East Hanover Township, 2 Bridge Replacement 270,000 3 (Base Project Allocation - $140,000) 4 (Land Allocation - $30,000) 5 (Design and Contingencies - $100,000) 6 (7) SR 4011 over Tributary of Swatara 7 Creek, North Londonderry Township, 8 Bridge Replacement 821,000 9 (Base Project Allocation - $600,000) 10 (Land Allocation - $45,000) 11 (Design and Contingencies - $176,000) 12 (8) PA 341 over Little Conewago Creek, 13 South Londonderry Township, Bridge 14 Replacement 420,000 15 (Base Project Allocation - $300,000) 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $100,000) 18 (9) SR 1020, Lickdale Road over Oil Run, 19 Swatara Township, Bridge 20 Rehabilitation 1,660,000 21 (Base Project Allocation - $960,000) 22 (Design and Contingencies - $700,000) 23 (10) SR 4022, Clement Avenue over 24 Tributary of Indiantown Run, Union 25 Township, Bridge Replacement 950,000 26 (Base Project Allocation - $950,000) 27 (11) SR 4020, Fisher Avenue over Tributary 28 of Swatara Creek, Union Township, 29 Bridge Replacement 950,000 30 (Base Project Allocation - $950,000) 20080S1503B2474 - 229 -
1 Section 43. Lehigh County.
2 (a) Local Bridges (Reserved) <--
3 (A) LOCAL BRIDGES <--
4 (1) CITY OF ALLENTOWN, READING ROAD OVER
5 CEDAR CREEK, BRIDGE REPLACEMENT 340,000
6 (BASE PROJECT ALLOCATION - $240,000)
7 (DESIGN AND CONTINGENCIES - $100,000)
8 (2) CITY OF ALLENTOWN, LEHIGH STREET OVER
9 LITTLE LEHIGH CREEK, BRIDGE
10 REPLACEMENT 800,000
11 (BASE PROJECT ALLOCATION - $600,000)
12 (DESIGN AND CONTINGENCIES - $200,000)
13 (3) CATASAUQUA BOROUGH, PINE STREET OVER
14 LEHIGH RIVER, BRIDGE REHABILITATION 600,000
15 (BASE PROJECT ALLOCATION - $560,000)
16 (DESIGN AND CONTINGENCIES - $40,000)
17 (4) LOWHILL TOWNSHIP, BITTNERS CREEK ROAD
18 OVER JORDAN CREEK, BRIDGE
19 REHABILITATION 140,000
20 (BASE PROJECT ALLOCATION - $120,000)
21 (DESIGN AND CONTINGENCIES - $20,000)
22 (b) State Bridges
23 (1) SR 1002, Tilghman Street over Lehigh
24 River Corman River, City Allentown,
25 Bridge Rehabilitation 1,450,000
26 (Base Project Allocation - $700,000)
27 (Land Allocation - $75,000)
28 (Design and Contingencies - $675,000)
29 (2) SR 4009, Newside Road over Mill Creek,
30 Heidelberg Township, Bridge
20080S1503B2474 - 230 -
1 Rehabilitation 324,000 2 (Base Project Allocation - $114,000) 3 (Land Allocation - $50,000) 4 (Design and Contingencies - $160,000) 5 (3) SR 4007 over Jordan Creek, North 6 Whitehall Township, Bridge 7 Rehabilitation 2,900,000 8 (Base Project Allocation - $1,400,000) 9 (Land Allocation - $250,000) 10 (Design and Contingencies - $1,250,000) 11 (4) PA 29/100, LR 158 OVER INDIAN CREEK, <-- 12 UPPER MILFORD TOWNSHIP, BRIDGE 13 REHABILITATION 156,000 14 (BASE PROJECT ALLOCATION - $109,000) 15 (DESIGN AND CONTINGENCIES - $47,000) 16 (5) SR 1017, LR 39038 OVER COPLAY CREEK, 17 NORTH WHITEHALL TOWNSHIP, BRIDGE 18 REHABILITATION 193,000 19 (BASE PROJECT ALLOCATION - $135,000) 20 (DESIGN AND CONTINGENCIES - $58,000) 21 (6) SR 1017, LR 39038 OVER JORDAN CREEK, 22 SOUTH WHITEHALL TOWNSHIP, BRIDGE 23 REHABILITATION 930,000 24 (BASE PROJECT ALLOCATION - $651,000) 25 (DESIGN AND CONTINGENCIES - $279,000) 26 (7) SR 0143 OVER TRIBUTARY OF ONTELAUNEE 27 CREEK, LYNN TOWNSHIP, BRIDGE 28 REHABILITATION 58,000 29 (BASE PROJECT ALLOCATION - $40,000) 30 (DESIGN AND CONTINGENCIES - $18,000) 20080S1503B2474 - 231 -
1 (8) SR 2016, LR 39006 OVER TRIBUTARY OF 2 HOSENSAKE CREEK, LOWER MILFORD 3 TOWNSHIP, BRIDGE REHABILITATION 176,000 4 (BASE PROJECT ALLOCATION - $123,000) 5 (DESIGN AND CONTINGENCIES - $53,000) 6 (9) SR 2029, LR 39002 OVER TRIBUTARY OF 7 HOSENSACK CREEK, LOWER MILFORD 8 TOWNSHIP, BRIDGE REHABILITATION 109,000 9 (BASE PROJECT ALLOCATION - $76,000) 10 (DESIGN AND CONTINGENCIES - $33,000) 11 (10) SR 2047, LR 39078, LANDIS MILL ROAD 12 OVER TUMBLE BROOK, UPPER SAUCON 13 TOWNSHIP, BRIDGE REPLACEMENT 812,000 14 (DESIGN AND CONTINGENCIES - $812,000) 15 (11) SR 2049, LR 39081 OVER SAUCON CREEK, 16 UPPER SAUCON TOWNSHIP, BRIDGE 17 REHABILITATION 480,000 18 (BASE PROJECT ALLOCATION - $336,000) 19 (DESIGN AND CONTINGENCIES - $144,000) 20 (12) SR 0378, LR 297 OVER SAUCON CREEK, 21 UPPER SAUCON TOWNSHIP, BRIDGE 22 REHABILITATION 817,000 23 (BASE PROJECT ALLOCATION - $572,000) 24 (DESIGN AND CONTINGENCIES - $245,000) 25 (13) SR 4003, LR 39048 OVER JORDAN CREEK, 26 NORTH WHITEHALL TOWNSHIP, BRIDGE 27 REHABILITATION 1,130,000 28 (BASE PROJECT ALLOCATION - $791,000) 29 (DESIGN AND CONTINGENCIES - $339,000) 30 (14) SR 4004, LR 39071 OVER TRIBUTARY OF 20080S1503B2474 - 232 -
1 JORDAN CREEK, SOUTH WHITEHALL TOWNSHIP, 2 BRIDGE REHABILITATION 99,000 3 (BASE PROJECT ALLOCATION - $69,000) 4 (DESIGN AND CONTINGENCIES - $30,000) 5 (15) SR 4004, LR 39071 OVER HASSEN CREEK, 6 UPPER MACUNGIE TOWNSHIP, BRIDGE 7 REHABILITATION 390,000 8 (BASE PROJECT ALLOCATION - $273,000) 9 (DESIGN AND CONTINGENCIES - $117,000) 10 (16) SR 4007, LR 39057 OVER TRIBUTARY OF 11 JORDAN CREEK, LOWHILL TOWNSHIP, BRIDGE 12 REHABILITATION 37,000 13 (BASE PROJECT ALLOCATION - $26,000) 14 (DESIGN AND CONTINGENCIES - $11,000) 15 (17) SR 4009, LR 39057 OVER MILL CREEK, 16 HEIDELBERG TOWNSHIP, BRIDGE 17 REHABILITATION 625,000 18 (BASE PROJECT ALLOCATION - $500,000) 19 (DESIGN AND CONTINGENCIES - $125,000) 20 (18) SR 4009, LR 39057 OVER TRIBUTARY OF 21 MILL CREEK, HEIDELBERG TOWNSHIP, BRIDGE 22 REHABILITATION 57,000 23 (BASE PROJECT ALLOCATION - $40,000) 24 (DESIGN AND CONTINGENCIES - $17,000) 25 (19) SR 4014, LR 39057 OVER TRIBUTARY OF 26 MILL CREEK, HEIDELBERG TOWNSHIP, BRIDGE 27 REHABILITATION 56,000 28 (BASE PROJECT ALLOCATION - $39,000) 29 (DESIGN AND CONTINGENCIES - $17,000) 30 (20) SR 4019, LR 39063 OVER SWITZER CREEK, 20080S1503B2474 - 233 -
1 LOWHILL TOWNSHIP, BRIDGE 2 REHABILITATION 293,000 3 (BASE PROJECT ALLOCATION - $205,000) 4 (DESIGN AND CONTINGENCIES - $88,000) 5 (21) SR 4022, LR 39054 OVER TROUT CREEK, 6 WASHINGTON TOWNSHIP, BRIDGE 7 REHABILITATION 153,000 8 (BASE PROJECT ALLOCATION - $107,000) 9 (DESIGN AND CONTINGENCIES - $46,000) 10 (22) SR 4024, LR 39056 OVER ONTELAUNEE 11 CREEK, LYNN TOWNSHIP, BRIDGE 12 REHABILITATION 225,000 13 (BASE PROJECT ALLOCATION - $157,000) 14 (DESIGN AND CONTINGENCIES - $68,000) 15 (23) US 222, LR 157 OVER CEDAR CREEK, 16 ALLENTOWN CITY, BRIDGE REHABILITATION 1,072,000 17 (BASE PROJECT ALLOCATION - $750,000) 18 (DESIGN AND CONTINGENCIES - $322,000) 19 Section 44. Luzerne County. 20 (a) Local Bridges 21 (1) Fairmount Township, T-654 over Kitchen 22 Creek, Bridge Replacement 630,000 23 (Base Project Allocation - $630,000) 24 (2) New Colombus Borough, T-486 over 25 Little Pine Creek, Bridge Replacement 430,000 26 (Base Project Allocation - $430,000) 27 (3) Lehman Township, T-581 over Pikes 28 Creek, Bridge Replacement 630,000 29 (Base Project Allocation - $630,000) 30 (4) Exeter Township, County Road No.10 20080S1503B2474 - 234 -
1 over Sutton Creek, Bridge Replacement 630,000 2 (Base Project Allocation - $630,000) 3 (5) Exeter Township, County Road No.10 4 over Sutton Creek, Bridge Replacement 630,000 5 (Base Project Allocation - $630,000) 6 (6) Rice Township, County Road No.23 over 7 Wapwallopen Creek, Bridge Replacement 630,000 8 (Base Project Allocation - $630,000) 9 (7) Nescopeck Township, T-376 over 10 Nescopeck Creek, Bridge Replacement 630,000 11 (Base Project Allocation - $630,000) 12 (8) Salem Township, T-436 over Beach Haven 13 Creek, Bridge Replacement 630,000 14 (Base Project Allocation - $630,000) 15 (9) Shickshinny Borough, Glen Avenue over 16 Shickshinny Creek, Bridge Replacement 150,000 17 (Base Project Allocation - $150,000) 18 (10) Shickshinny Borough, Bartoli Lane 19 over Shickshinny Creek, Bridge 20 Replacement 150,000 21 (Base Project Allocation - $150,000) 22 (11) Avoca Borough, County-owned Railroad 23 over McAlpine Street, Bridge 24 Rehabilitation 50,000 25 (Base Project Allocation - $45,000) 26 (Design and Contingencies - $5,000) 27 (12) Avoca Borough, County-owned Railroad 28 over C.P. Railroad, Bridge 29 Rehabilitation 63,000 30 (Base Project Allocation - $57,000) 20080S1503B2474 - 235 -
1 (Design and Contingencies - $6,000) 2 (13) Avoca Borough, County-owned Railroad 3 over R.B.M.N. Railroad, Bridge 4 Rehabilitation 66,000 5 (Base Project Allocation - $60,000) 6 (Design and Contingencies - $6,000) 7 (14) Avoca Borough, County-owned Railroad 8 over York Avenue, Bridge 9 Rehabilitation 55,000 10 (Base Project Allocation - $50,000) 11 (Design and Contingencies - $5,000) 12 (15) Avoca Borough, County-owned Railroad 13 over Kerr McGee, Bridge Rehabilitation 22,000 14 (Base Project Allocation - $20,000) 15 (Design and Contingencies - $2,000) 16 (16) City of Wilkes-Barre, County-owned 17 Railroad over Laurel Run Creek, Bridge 18 Rehabilitation 110,000 19 (Base Project Allocation - $100,000) 20 (Design and Contingencies - $10,000) 21 (17) Ashley Borough, County-owned Railroad 22 over Ashley Street, Bridge 23 Rehabilitation 61,000 24 (Base Project Allocation - $55,000) 25 (Design and Contingencies - $6,000) 26 (18) Ashley Borough, County-owned Railroad 27 over Cemetery Street, Bridge 28 Demolition 132,000 29 (Base Project Allocation - $120,000) 30 (Design and Contingencies - $12,000) 20080S1503B2474 - 236 -
1 (19) Ashley Borough, County-owned Railroad 2 over Carey Street, Bridge Demolition 55,000 3 (Base Project Allocation - $50,000) 4 (Design and Contingencies - $5,000) 5 (20) City of Pittston, County-owned 6 Railroad over Susquehanna River, Bridge 7 Rehabilitation 550,000 8 (Base Project Allocation - $500,000) 9 (Design and Contingencies - $50,000) 10 (21) City of Wilkes-Barre, County-owned 11 Railroad over Mill Creek, Bridge 12 Rehabilitation 34,000 13 (Base Project Allocation - $30,000) 14 (Design and Contingencies - $4,000) 15 (22) City of Wilkes-Barre, County-owned 16 Railroad over Scott Street, Bridge 17 Rehabilitation 165,000 18 (Base Project Allocation - $150,000) 19 (Design and Contingencies - $15,000) 20 (23) City of Wilkes-Barre, County-owned 21 Railroad over Shelbourne Street, Bridge 22 Rehabilitation 39,000 23 (Base Project Allocation - $35,000) 24 (Design and Contingencies - $4,000) 25 (24) Pittston Township, County-owned 26 Railroad over Suscon Road, New Bridge 27 Construction 2,750,000 28 (Base Project Allocation - $2,500,000) 29 (Design and Contingencies - $250,000) 30 (25) Pittston Township, County-owned 20080S1503B2474 - 237 -
1 Railroad over Suscon Mill Creek, Bridge 2 Rehabilitation 22,000 3 (Base Project Allocation - $20,000) 4 (Design and Contingencies - $2,000) 5 (26) Wycoming Borough, County-owned 6 Railroad over Abrahams Creek, Bridge 7 Rehabilitation 22,000 8 (Base Project Allocation - $20,000) 9 (Design and Contingencies - $2,000) 10 (27) Exeter Borough, County-owned Railroad 11 over Stephens Road, Bridge 12 Rehabilitation 22,000 13 (Base Project Allocation - $20,000) 14 (Design and Contingencies - $2,000) 15 (28) City of Wilkes-Barre, County-owned 16 Railroad over Laurel Run Creek, Bridge 17 Rehabilitation 11,000 18 (Base Project Allocation - $10,000) 19 (Design and Contingencies - $1,000) 20 (29) City of Wilkes-Barre, County-owned 21 Railroad over Thomas Street, Bridge 22 Rehabilitation 22,000 23 (Base Project Allocation - $20,000) 24 (Design and Contingencies - $2,000) 25 (30) City of Wilkes-Barre, County-owned 26 Railroad over Mayock Street, Bridge 27 Rehabilitation 44,000 28 (Base Project Allocation - $40,000) 29 (Design and Contingencies - $4,000) 30 (31) Lehman Township, T-581 over Pikes 20080S1503B2474 - 238 -
1 Creek, Bridge Replacement 660,000 2 (Base Project Allocation - $630,000) 3 (Land Allocation - $30,000) 4 (32) Fairmount Township, T-654 over 5 Kitchen Creek, Bridge Replacement 660,000 6 (Base Project Allocation - $630,000) 7 (Land Allocation - $30,000) 8 (33) City of Wilkes-Barre/Hanover 9 Township, Division Street over Solomon 10 Creek, Bridge Replacement 660,000 11 (Base Project Allocation - $630,000) 12 (Land Allocation - $30,000) 13 (34) Hanover Township, West Liberty Street 14 over Solomon Creek, Bridge Replacement 660,000 15 (Base Project Allocation - $630,000) 16 (Land Allocation - $30,000) 17 (35) Exeter Township, County Road No.10 18 over Sutton Creek, Bridge Replacement 660,000 19 (Base Project Allocation - $630,000) 20 (Land Allocation - $30,000) 21 (36) Exeter Township, County Road No.10 22 over Sutton Creek, Bridge Replacement 660,000 23 (Base Project Allocation - $630,000) 24 (Land Allocation - $30,000) 25 (37) Rice Township, County Road No.23 over 26 Wapwallopen Creek, Bridge Replacement 660,000 27 (Base Project Allocation - $630,000) 28 (Land Allocation - $60,000) 29 (38) New Columbus Borough, T-486 over 30 Little Pine Creek, Bridge Replacement 460,000 20080S1503B2474 - 239 -
1 (Base Project Allocation - $430,000) 2 (Land Allocation - $30,000) 3 (39) Nescopeck Township, T-376 over 4 Nescopeck Creek, Bridge Replacement 660,000 5 (Base Project Allocation - $630,000) 6 (Land Allocation - $30,000) 7 (40) Salem Township, T-436 over Beach 8 Haven Creek, Bridge Replacement 660,000 9 (Base Project Allocation - $630,000) 10 (Land Allocation - $30,000) 11 (41) Black Creek Township, T-514 over 12 Black Creek, Bridge Replacement 660,000 13 (Base Project Allocation - $630,000) 14 (Land Allocation - $30,000) 15 (42) Butler Township, County Road No.39 16 over Nescopeck Creek, Bridge 17 Replacement 660,000 18 (Base Project Allocation - $630,000) 19 (Land Allocation - $30,000) 20 (43) Butler Township, T-356 over Nescopeck 21 Creek, Bridge Replacement 660,000 22 (Base Project Allocation - $630,000) 23 (Land Allocation - $30,000) 24 (44) Sugarloaf Township, T-342 over 25 Nescopeck Creek, Bridge Replacement 660,000 26 (Base Project Allocation - $630,000) 27 (Land Allocation - $30,000) 28 (45) KINGSTON TOWNSHIP, CENTER STREET T- <-- 29 846 OVER TOBY'S CREEK, BRIDGE 30 REPLACEMENT 718,000 20080S1503B2474 - 240 -
1 (BASE PROJECT ALLOCATION - $718,000) 2 (b) State Bridges 3 (1) SR 3010 over Branch of Wapwallopen 4 Creek, Dorrance Township, Bridge 5 Rehabilitation 41,000 6 (Base Project Allocation - $28,000) 7 (Land Allocation - $3,000) 8 (Design and Contingencies - $10,000) 9 (2) SR 4020 over Pine Creek, Fairmount 10 Township, Bridge Rehabilitation 154,000 11 (Base Project Allocation - $106,000) 12 (Land Allocation - $11,000) 13 (Design and Contingencies - $37,000) 14 (3) SR 0011 over Abrahams Creek, Forty 15 Fort Borough, Bridge Rehabilitation 442,000 16 (Base Project Allocation - $304,000) 17 (Land Allocation - $30,000) 18 (Design and Contingencies - $108,000) 19 (4) SR 4005 over Hunlock Creek, Hunlock 20 Township, Bridge Replacement 70,000 21 (Base Project Allocation - $48,000) 22 (Land Allocation - $5,000) 23 (Design and Contingencies - $17,000) 24 (5) SR 4010 over Huntington Creek, 25 Huntington Township, Bridge 26 Rehabilitation 250,000 27 (Base Project Allocation - $173,000) 28 (Land Allocation - $17,000) 29 (Design and Contingencies - $60,000) 30 (6) SR 1012 over Branch of Harvey's Creek, 20080S1503B2474 - 241 -
1 Jackson Township, Bridge Replacement 635,000 2 (Base Project Allocation - $500,000) 3 (Land Allocation - $35,000) 4 (Design and Contingencies - $100,000) 5 (7) SR 4037 over Stone Church Hollow 6 Creek, Salem Township, Bridge 7 Rehabilitation 110,000 8 (Base Project Allocation - $76,000) 9 (Land Allocation - $8,000) 10 (Design and Contingencies - $26,000) 11 (8) SR 0080, East Bound over Linesville 12 Creek, White Haven Borough, Bridge 13 Rehabilitation 52,000 14 (Base Project Allocation - $35,000) 15 (Land Allocation - $4,000) 16 (Design and Contingencies - $13,000) 17 (9) SR 2032, near Intersection of SR 2030, 18 over Abandoned Railroad, Duryea and 19 Hughestown Boroughs, Railroad Abutments 20 Removal 18,000 21 (Base Project Allocation - $18,000) 22 (10) SR 2029, York Avenue near 23 Intersection with Wood Street, over 24 Abandoned Railroad, Duryea Borough, 25 Railroad Abutments Removal 26,000 26 (Base Project Allocation - $18,000) 27 (Land Allocation - $8,000) 28 Section 45. Lycoming County. 29 (a) Local Bridges 30 (1) Armstrong Township, T-329 over 20080S1503B2474 - 242 -
1 Mosquito Creek, Bridge Replacement 339,000 2 (Base Project Allocation - $300,000) 3 (Design and Contingencies - $39,000) 4 (b) State Bridges 5 (1) SR 0654 over Benders Run, Bastress 6 Township, Bridge Replacement 450,000 7 (Base Project Allocation - $300,000) 8 (Land Allocation - $30,000) 9 (Design and Contingencies - $120,000) 10 (2) SR 2001 over Black Hole Creek, Clinton 11 Township, Bridge Replacement 161,000 12 (Base Project Allocation - $100,000) 13 (Land Allocation - $15,000) 14 (Design and Contingencies - $46,000) 15 (3) SR 2019, Bridge No.24895 over German 16 Run, Franklin Township, Bridge 17 Replacement 134,000 18 (Base Project Allocation - $134,000) 19 (4) Wintersteen Road over Branch of West 20 Branch Run, Franklin Township, Bridge 21 Replacement 134,000 22 (Base Project Allocation - $134,000) 23 (5) SR 0042 over Little Muncy Creek, 24 Jordan Township, Bridge Replacement 760,000 25 (Base Project Allocation - $610,000) 26 (Land Allocation - $30,000) 27 (Design and Contingencies - $120,000) 28 (6) SR 0973 over Hoagland Run, Lycoming 29 Township, Bridge Replacement 290,000 30 (Base Project Allocation - $180,000) 20080S1503B2474 - 243 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $100,000) 3 (7) SR 3005 over Mud Road, Mifflin 4 Township, Bridge Replacement 130,000 5 (Base Project Allocation - $100,000) 6 (Design and Contingencies - $30,000) 7 (8) SR 2019, Bridge No.24893 over German 8 Run, Moreland Township, Bridge 9 Replacement 134,000 10 (Base Project Allocation - $134,000) 11 (9) SR 2048 over Little Muncy Creek, Muncy 12 Creek Township, Bridge Replacement 292,000 13 (Base Project Allocation - $240,000) 14 (Land Allocation - $15,000) 15 (Design and Contingencies - $37,000) 16 (10) SR 2014 over Twin Run, Muncy 17 Township, Bridge Replacement 250,000 18 (Base Project Allocation - $200,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $40,000) 21 (11) SR 3014 over Bottle Run, Old Lycoming 22 Township, Bridge Rehabilitation 110,000 23 (Base Project Allocation - $100,000) 24 (Design and Contingencies - $10,000) 25 (12) SR 0864, Bridge No.24776 over Mill 26 Creek, Upper Fairfield Township, Bridge 27 Rehabilitation 130,000 28 (Base Project Allocation - $100,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $20,000) 20080S1503B2474 - 244 -
1 (13) SR 2002 over Laurel Run, Washington 2 Township, Bridge Replacement 150,000 3 (Base Project Allocation - $120,000) 4 (Design and Contingencies - $30,000) 5 (14) SR 0864, TWO MILES EAST OF FARRAGUT <-- 6 OVER MILL CREEK, D478, UPPER FAIRFIELD 7 TOWNSHIP, BRIDGE REHABILITATION 106,000 8 (BASE PROJECT ALLOCATION - $105,000) 9 (DESIGN AND CONTINGENCIES - $1,000) 10 (15) SR 3013 OVER QUENSHUKENY RUN, 11 WOODWARD TOWNSHIP, BRIDGE 12 REHABILITATION 106,000 13 (BASE PROJECT ALLOCATION - $105,000) 14 (DESIGN AND CONTINGENCIES - $1,000) 15 (16) SR 0044, LR 266, ONE MILE NORTH OF 16 WATERVILLE, OVER PINE CREEK, CUMMINGS 17 TOWNSHIP, BRIDGE REHABILITATION 106,000 18 (BASE PROJECT ALLOCATION - $105,000) 19 (DESIGN AND CONTINGENCIES - $1,000) 20 (17) SR 2011 OVER LAUREL RUN, MORELAND 21 TOWNSHIP, BRIDGE REHABILITATION 106,000 22 (BASE PROJECT ALLOCATION - $105,000) 23 (DESIGN AND CONTINGENCIES - $1,000) 24 (18) SR 2039 OVER MILL CREEK, ELDRED 25 TOWNSHIP, BRIDGE REHABILITATION 120,000 26 (BASE PROJECT ALLOCATION - $118,000) 27 (DESIGN AND CONTINGENCIES - $2,000) 28 (19) SR 2048 OVER LITTLE MUNCY CREEK, 29 MUNCY CREEK TOWNSHIP, BRIDGE 30 REHABILITATION 287,000 20080S1503B2474 - 245 -
1 (BASE PROJECT ALLOCATION - $240,000) 2 (LAND ALLOCATION - $15,000) 3 (DESIGN AND CONTINGENCIES - $32,000) 4 (20) SR 0284 OVER BONNELL RUN, PINE 5 TOWNSHIP, BRIDGE REHABILITATION 120,000 6 (BASE PROJECT ALLOCATION - $118,000) 7 (DESIGN AND CONTINGENCIES - $2,000) 8 (21) SR 0973 OVER HOAGLAND RUN, LYCOMING 9 TOWNSHIP, BRIDGE REPLACEMENT 1,000,000 10 (BASE PROJECT ALLOCATION - $870,000) 11 (LAND ALLOCATION - $30,000) 12 (DESIGN AND CONTINGENCIES - $100,000) 13 (22) US 15 SOUTHBOUND LANE OVER WEST 14 FOURTH STREET, CITY OF WILLIAMSPORT, 15 BRIDGE REHABILITATION 1,291,000 16 (BASE PROJECT ALLOCATION - $1,139,000) 17 (DESIGN AND CONTINGENCIES - $152,000) 18 (23) US 15 SOUTHBOUND LANE OVER MEMORIAL 19 AVENUE, WILLIAMSPORT CITY, BRIDGE 20 REHABILITATION 1,291,000 21 (BASE PROJECT ALLOCATION - $1,139,000) 22 (DESIGN AND CONTINGENCIES - $152,000) 23 (24) PA 864 OVER MILL CREEK, UPPER 24 FAIRFIELD TOWNSHIP, BRIDGE 25 REHABILITATION 669,000 26 (BASE PROJECT ALLOCATION - $629,000) 27 (DESIGN AND CONTINGENCIES - $40,000) 28 (25) SR 0864, 2.5 MILES EAST OF FARRAGUT, 29 OVER MILL CREEK, UPPER FAIRFIELD 30 TOWNSHIP, BRIDGE REHABILITATION 163,000 20080S1503B2474 - 246 -
1 (BASE PROJECT ALLOCATION - $156,000) 2 (DESIGN AND CONTINGENCIES - $7,000) 3 (26) SR 0044 (LR 266) OVER PINE CREEK, 4 CUMMINGS TOWNSHIP, BRIDGE 5 REHABILITATION 163,000 6 (BASE PROJECT ALLOCATION - $156,000) 7 (DESIGN AND CONTINGENCIES - $7,000) 8 (27) SR 1002 OVER LYCOMING CREEK, VILLAGE 9 OF TROUT RUN, LEWIS TOWNSHIP, BRIDGE 10 REHABILITATION 163,000 11 (BASE PROJECT ALLOCATION - $156,000) 12 (DESIGN AND CONTINGENCIES - $7,000) 13 (28) SR 2014 OVER TWIN RUN, MUNCY 14 TOWNSHIP, BRIDGE REPLACEMENT 1,026,000 15 (BASE PROJECT ALLOCATION - $1,000,000) 16 (LAND ALLOCATION - $6,000) 17 (DESIGN AND CONTINGENCIES - $20,000) 18 (29) SR 2014 OVER DOUGHERTYS RUN, 19 WILLIAMSPORT CITY, BRIDGE 20 REHABILITATION 14,000 21 (BASE PROJECT ALLOCATION - $13,000) 22 (DESIGN AND CONTINGENCIES - $1,000) 23 (30) SR 2024 OVER MILLERS RUN, LOYALSOCK 24 TOWNSHIP, BRIDGE REHABILITATION 14,000 25 (BASE PROJECT ALLOCATION - $13,000) 26 (DESIGN AND CONTINGENCIES - $1,000) 27 (31) SR 3027 OVER SR 220, PORTER TOWNSHIP, 28 BRIDGE REHABILITATION 14,000 29 (BASE PROJECT ALLOCATION - $13,000) 30 (DESIGN AND CONTINGENCIES - $1,000) 20080S1503B2474 - 247 -
1 (32) SR 4001 OVER LITTLE PINE CREEK, PINE
2 TOWNSHIP, BRIDGE REHABILITATION 14,000
3 (BASE PROJECT ALLOCATION - $13,000)
4 (DESIGN AND CONTINGENCIES - $1,000)
5 (33) SR 4016 OVER PINE CREEK, VILLAGE OF
6 SLATE RUN, BROWN TOWNSHIP, BRIDGE
7 REHABILITATION 163,000
8 (BASE PROJECT ALLOCATION - $156,000)
9 (DESIGN AND CONTINGENCIES - $7,000)
10 (34) SR 414 OVER CEDAR RUN, VILLAGE OF
11 CEDAR RUN, BROWN TOWNSHIP, BRIDGE
12 REHABILITATION 163,000
13 (BASE PROJECT ALLOCATION - $156,000)
14 (DESIGN AND CONTINGENCIES - $7,000)
15 (35) SR 554 OVER HAGERMANS RUN, ARMSTRONG
16 TOWNSHIP, BRIDGE REHABILITATION 550,000
17 (BASE PROJECT ALLOCATION - $500,000)
18 (DESIGN AND CONTINGENCIES - $50,000)
19 Section 46. McKean County.
20 (a) Local Bridges (Reserved) <--
21 (A) LOCAL BRIDGES <--
22 (1) KEATING TOWNSHIP, SR 0059 OVER SR
23 0059, BRIDGE REPLACEMENT 83,000
24 (BASE PROJECT ALLOCATION - $42,000)
25 (LAND ALLOCATION - $20,000)
26 (DESIGN AND CONTINGENCIES - $21,000)
27 (b) State Bridges
28 (1) SR 0155 over Annin Creek, Annin
29 Township, Bridge Replacement 2,850,000
30 (Base Project Allocation - $2,000,000)
20080S1503B2474 - 248 -
1 (Land Allocation - $200,000) 2 (Design and Contingencies - $650,000) 3 (2) SR 1002 over Allegheny River, Annin 4 Township, Bridge Rehabilitation 837,000 5 (Base Project Allocation - $437,000) 6 (Land Allocation - $100,000) 7 (Design and Contingencies - $300,000) 8 (3) SR 0046 over Kendall Creek, Foster 9 Township, Bridge Replacement 215,000 10 (Base Project Allocation - $140,000) 11 (Design and Contingencies - $75,000) 12 (4) SR 0346 over Branch of Foster Brook, 13 Foster Township, Bridge Replacement 1,225,000 14 (Base Project Allocation - $800,000) 15 (Land Allocation - $125,000) 16 (Design and Contingencies - $300,000) 17 (5) SR 0046, PA 46 over Branch of Kendall 18 Creek, Foster Township, Bridge 19 Replacement 515,000 20 (Base Project Allocation - $140,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $325,000) 23 (6) SR 0146 over Branch of Warner Brook, 24 Hamlin Township, Bridge Replacement 215,000 25 (Base Project Allocation - $140,000) 26 (Design and Contingencies - $75,000) 27 (7) SR 0059 over Warner Brook, Keating 28 Township, Bridge Replacement 275,000 29 (Base Project Allocation - $200,000) 30 (Design and Contingencies - $75,000) 20080S1503B2474 - 249 -
1 (8) SR 1002 over Branch Perce Brook, 2 Keating Township, Bridge Replacement 300,000 3 (Base Project Allocation - $200,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $50,000) 6 (9) SR 0155 over Allegheny River, Liberty 7 Township, Bridge Rehabilitation 650,000 8 (Base Project Allocation - $650,000) 9 (10) SR 0155 over Hamilton Run, Liberty 10 Township, Bridge Rehabilitation 650,000 11 (Base Project Allocation - $650,000) 12 (11) SR 0046 over Branch of Potato Creek, 13 Norwich Township, Bridge Replacement 300,000 14 (Base Project Allocation - $200,000) 15 (Land Allocation - $50,000) 16 (Design and Contingencies - $50,000) 17 (12) SR 0246 over Baker Run, Otto 18 Township, Bridge Replacement 1,975,000 19 (Base Project Allocation - $1,250,000) 20 (Land Allocation - $125,000) 21 (Design and Contingencies - $600,000) 22 (13) SR 0346 over Windfall Run, Otto 23 Township, Bridge Replacement 300,000 24 (Base Project Allocation - $200,000) 25 (Land Allocation - $50,000) 26 (Design and Contingencies - $50,000) 27 (14) SR 0006 over Marvin Creek, Smethport 28 Borough, Bridge Replacement 2,385,000 29 (Base Project Allocation - $2,000,000) 30 (Land Allocation - $20,000) 20080S1503B2474 - 250 -
1 (Design and Contingencies - $365,000) 2 (15) SR 0006, KANE BRANCH OF MARVIN CREEK, <-- 3 HAMLIN TOWNSHIP, BRIDGE REPLACEMENT 116,000 4 (BASE PROJECT ALLOCATION - $64,000) 5 (LAND ALLOCATION - $20,000) 6 (DESIGN AND CONTINGENCIES - $32,000) 7 (16) SR 0006 OVER LONG BROOK, HAMLIN 8 TOWNSHIP, BRIDGE REPLACEMENT 188,000 9 (BASE PROJECT ALLOCATION - $112,000) 10 (LAND ALLOCATION - $20,000) 11 (DESIGN AND CONTINGENCIES - $56,000) 12 (17) SR 0006 OVER BRANCH OF MARVIN CREEK, 13 HAMLIN TOWNSHIP, BRIDGE REPLACEMENT 76,000 14 (BASE PROJECT ALLOCATION - $37,000) 15 (LAND ALLOCATION - $20,000) 16 (DESIGN AND CONTINGENCIES - $19,000) 17 (18) SR 0006 OVER TRIBUTARY OF ALLEGHENY 18 RIVER, LIBERTY TOWNSHIP, BRIDGE 19 REPLACEMENT 119,000 20 (BASE PROJECT ALLOCATION - $66,000) 21 (LAND ALLOCATION - $20,000) 22 (DESIGN AND CONTINGENCIES - $33,000) 23 (19) SR 0006 OVER SARTWELL CREEK, LIBERTY 24 TOWNSHIP, BRIDGE REPLACEMENT 353,000 25 (BASE PROJECT ALLOCATION - $222,000) 26 (LAND ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $111,000) 28 (20) SR 0006 OVER LILLI CREEK, PORT 29 ALLEGANY BOROUGH, BRIDGE REPLACEMENT 308,000 30 (BASE PROJECT ALLOCATION - $192,000) 20080S1503B2474 - 251 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $96,000) 3 (21) SR 0046 OVER TUNUNGWANT CREEK, 4 BRADFORD CITY, BRIDGE REPLACEMENT 969,000 5 (BASE PROJECT ALLOCATION - $869,000) 6 (LAND ALLOCATION - $100,000) 7 (22) SR 0046 OVER KENDALL CREEK, FOSTER 8 TOWNSHIP, BRIDGE REPLACEMENT 116,000 9 (BASE PROJECT ALLOCATION - $64,000) 10 (LAND ALLOCATION - $20,000) 11 (DESIGN AND CONTINGENCIES - $32,000) 12 (23) SR 0046 OVER NORTH BRANCH OF COLE 13 CREEK, KEATING TOWNSHIP, BRIDGE 14 REPLACEMENT 260,000 15 (BASE PROJECT ALLOCATION - $160,000) 16 (LAND ALLOCATION - $20,000) 17 (DESIGN AND CONTINGENCIES - $80,000) 18 (24) SR 0046 OVER PIGEON HOLLOW RUN, 19 NORWICH TOWNSHIP, BRIDGE REPLACEMENT 74,000 20 (BASE PROJECT ALLOCATION - $36,000) 21 (LAND ALLOCATION - $20,000) 22 (DESIGN AND CONTINGENCIES - $18,000) 23 (25) SR 0046 OVER BRANCH OF POTATO CREEK, 24 NORWICH TOWNSHIP, BRIDGE REPLACEMENT 67,000 25 (BASE PROJECT ALLOCATION - $32,000) 26 (LAND ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $16,000) 28 (26) SR 0066 OVER WIND RUN, WETMORE 29 TOWNSHIP, BRIDGE REPLACEMENT 77,000 30 (BASE PROJECT ALLOCATION - $38,000) 20080S1503B2474 - 252 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $19,000) 3 (27) SR 0146 OVER WARNER BROOK, HAMLIN 4 TOWNSHIP, BRIDGE REPLACEMENT 92,000 5 (BASE PROJECT ALLOCATION - $48,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $24,000) 8 (28) SR 0155 OVER NEWELL CREEK, ELDRED 9 TOWNSHIP, BRIDGE REPLACEMENT 235,000 10 (BASE PROJECT ALLOCATION - $143,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $72,000) 13 (29) SR 0155 OVER TWO MILE CREEK, LIBERTY 14 TOWNSHIP, BRIDGE REPLACEMENT 248,000 15 (BASE PROJECT ALLOCATION - $152,000) 16 (LAND ALLOCATION - $20,000) 17 (DESIGN AND CONTINGENCIES - $76,000) 18 (30) SR 0155 OVER BIRCH RUN, LIBERTY 19 TOWNSHIP, BRIDGE REPLACEMENT 104,000 20 (BASE PROJECT ALLOCATION - $56,000) 21 (LAND ALLOCATION - $20,000) 22 (DESIGN AND CONTINGENCIES - $28,000) 23 (31) SR 0219 OVER LEWIS RUN, LAFAYETTE 24 TOWNSHIP, BRIDGE REPLACEMENT 296,000 25 (BASE PROJECT ALLOCATION - $184,000) 26 (LAND ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $92,000) 28 (32) SR 0246 OVER BOYD RUN, FOSTER 29 TOWNSHIP, BRIDGE REPLACEMENT 116,000 30 (BASE PROJECT ALLOCATION - $64,000) 20080S1503B2474 - 253 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $32,000) 3 (33) SR 0246, BRIDGE NO.25366 OVER BAKER 4 RUN, OTTO TOWNSHIP, BRIDGE REPLACEMENT 115,000 5 (BASE PROJECT ALLOCATION - $63,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $32,000) 8 (34) SR 0246, BRIDGE NO.25367 OVER BAKER 9 RUN, OTTO TOWNSHIP, BRIDGE REPLACEMENT 188,000 10 (BASE PROJECT ALLOCATION - $112,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $56,000) 13 (35) SR 0321 OVER MULLIN RUN, CORYDON 14 TOWNSHIP, BRIDGE REPLACEMENT 66,000 15 (BASE PROJECT ALLOCATION - $30,000) 16 (LAND ALLOCATION - $20,000) 17 (DESIGN AND CONTINGENCIES - $16,000) 18 (36) SR 0321 OVER FOUR MILE RUN WETMORE 19 TOWNSHIP, BRIDGE REPLACEMENT 34,000 20 (BASE PROJECT ALLOCATION - $3,000) 21 (LAND ALLOCATION - $20,000) 22 (DESIGN AND CONTINGENCIES - $11,000) 23 (37) SR 0346 OVER BENNETT BROOK, BRADFORD 24 CITY, BRIDGE REPLACEMENT 121,000 25 (BASE PROJECT ALLOCATION - $67,000) 26 (LAND ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $34,000) 28 (38) SR 0346 OVER GATES HOLLOW RUN, 29 BRADFORD TOWNSHIP, BRIDGE REPLACEMENT 68,000 30 (BASE PROJECT ALLOCATION - $32,000) 20080S1503B2474 - 254 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $16,000) 3 (39) SR 0346 OVER WILLOW CREEK, CORYDON 4 TOWNSHIP, BRIDGE REPLACEMENT 193,000 5 (BASE PROJECT ALLOCATION - $115,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $58,000) 8 (40) SR 0346 OVER WINDFALL RUN, OTTO 9 TOWNSHIP, BRIDGE REPLACEMENT 55,000 10 (BASE PROJECT ALLOCATION - $23,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $12,000) 13 (41) SR 0346, BRIDGE NO.25418 OVER FOSTER 14 BROOK, FOSTER TOWNSHIP, BRIDGE 15 REPLACEMENT 248,000 16 (BASE PROJECT ALLOCATION - $152,000) 17 (LAND ALLOCATION - $20,000) 18 (DESIGN AND CONTINGENCIES - $76,000) 19 (42) SR 0346, BRIDGE NO.25421 OVER FOSTER 20 BROOK, FOSTER TOWNSHIP, BRIDGE 21 REPLACEMENT 61,000 22 (BASE PROJECT ALLOCATION - $27,000) 23 (LAND ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $14,000) 25 (43) SR 0346, BRIDGE NO.25424 OVER TRAM 26 HOLLOW RUN, OTTO TOWNSHIP, BRIDGE 27 REPLACEMENT 56,000 28 (BASE PROJECT ALLOCATION - $24,000) 29 (LAND ALLOCATION - $20,000) 30 (DESIGN AND CONTINGENCIES - $12,000) 20080S1503B2474 - 255 -
1 (44) SR 0346, BRIDGE NO.25426 OVER TRAM 2 HOLLOW RUN, OTTO TOWNSHIP, BRIDGE 3 REPLACEMENT 140,000 4 (BASE PROJECT ALLOCATION - $80,000) 5 (LAND ALLOCATION - $20,000) 6 (DESIGN AND CONTINGENCIES - $40,000) 7 (45) SR 0446 OVER CANFIELD CREEK, ELDRED 8 TOWNSHIP, BRIDGE REPLACEMENT 110,000 9 (BASE PROJECT ALLOCATION - $60,000) 10 (LAND ALLOCATION - $20,000) 11 (DESIGN AND CONTINGENCIES - $30,000) 12 (46) SR 0446, BRIDGE NO.25444 OVER BRANCH 13 OF ALLEGHENY RIVER, ELDRED TOWNSHIP, 14 BRIDGE REPLACEMENT 64,000 15 (BASE PROJECT ALLOCATION - $29,000) 16 (LAND ALLOCATION - $20,000) 17 (DESIGN AND CONTINGENCIES - $15,000) 18 (47) SR 0446, BRIDGE NO.25445 OVER BRANCH 19 OF ALLEGHENY RIVER, ELDRED TOWNSHIP, 20 BRIDGE REPLACEMENT 76,000 21 (BASE PROJECT ALLOCATION - $37,000) 22 (LAND ALLOCATION - $20,000) 23 (DESIGN AND CONTINGENCIES - $19,000) 24 (48) SR 0646 OVER PENNBROOK RUN, FOSTER 25 TOWNSHIP, BRIDGE REPLACEMENT 152,000 26 (BASE PROJECT ALLOCATION - $88,000) 27 (LAND ALLOCATION - $20,000) 28 (DESIGN AND CONTINGENCIES - $44,000) 29 (49) SR 0770 OVER SHEPPARD RUN, BRADFORD 30 TOWNSHIP, BRIDGE REPLACEMENT 128,000 20080S1503B2474 - 256 -
1 (BASE PROJECT ALLOCATION - $72,000) 2 (LAND ALLOCATION - $20,000) 3 (DESIGN AND CONTINGENCIES - $36,000) 4 (50) SR 0770 OVER MINARD RUN, BRADFORD 5 TOWNSHIP, BRIDGE REPLACEMENT 76,000 6 (BASE PROJECT ALLOCATION - $37,000) 7 (LAND ALLOCATION - $20,000) 8 (DESIGN AND CONTINGENCIES - $19,000) 9 (51) SR 1002 OVER OPEN BROOK, ANNIN 10 TOWNSHIP, BRIDGE REPLACEMENT 133,000 11 (BASE PROJECT ALLOCATION - $75,000) 12 (LAND ALLOCATION - $20,000) 13 (DESIGN AND CONTINGENCIES - $38,000) 14 (52) SR 1002 OVER POTATO CREEK, KEATING 15 TOWNSHIP, BRIDGE REHABILITATION 806,000 16 (BASE PROJECT ALLOCATION - $706,000) 17 (LAND ALLOCATION - $100,000) 18 (53) SR 1002 OVER BRANCH OF PIERCE BROOK, 19 KEATING TOWNSHIP, BRIDGE REPLACEMENT 82,000 20 (BASE PROJECT ALLOCATION - $41,000) 21 (LAND ALLOCATION - $20,000) 22 (DESIGN AND CONTINGENCIES - $21,000) 23 (54) SR 1006 OVER KINGS RUN, CERES 24 TOWNSHIP, BRIDGE REPLACEMENT 152,000 25 (BASE PROJECT ALLOCATION - $88,000) 26 (LAND ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $44,000) 28 (55) SR 1009 OVER TAYLOR BROOK, CERES 29 TOWNSHIP, BRIDGE REPLACEMENT 76,000 30 (BASE PROJECT ALLOCATION - $37,000) 20080S1503B2474 - 257 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $19,000) 3 (56) SR 1011 OVER TAYLORS BROOK, ELDRED 4 TOWNSHIP, BRIDGE REPLACEMENT 67,000 5 (BASE PROJECT ALLOCATION - $31,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $16,000) 8 (57) SR 1011 OVER MEEKS RUN, ELDRED 9 TOWNSHIP, BRIDGE REPLACEMENT 122,000 10 (BASE PROJECT ALLOCATION - $68,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $34,000) 13 (58) SR 1011 OVER FOWLER RUN, ELDRED 14 TOWNSHIP, BRIDGE REPLACEMENT 106,000 15 (BASE PROJECT ALLOCATION - $57,000) 16 (LAND ALLOCATION - $20,000) 17 (DESIGN AND CONTINGENCIES - $29,000) 18 (59) SR 1015 OVER BAKER HOLLOW RUN, 19 KEATING TOWNSHIP, BRIDGE REPLACEMENT 94,000 20 (BASE PROJECT ALLOCATION - $49,000) 21 (LAND ALLOCATION - $20,000) 22 (DESIGN AND CONTINGENCIES - $25,000) 23 (60) SR 2001 OVER SMITH RUN, SERGEANT 24 TOWNSHIP, BRIDGE REPLACEMENT 54,000 25 (BASE PROJECT ALLOCATION - $30,000) 26 (LAND ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $4,000) 28 (61) SR 3002 OVER TWO MILE RUN, HAMILTON 29 TOWNSHIP, BRIDGE REPLACEMENT 77,000 30 (BASE PROJECT ALLOCATION - $38,000) 20080S1503B2474 - 258 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $19,000) 3 (62) SR 3003 OVER LANIGAN RUN, SERGEANT 4 TOWNSHIP, BRIDGE REPLACEMENT 115,000 5 (BASE PROJECT ALLOCATION - $63,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $32,000) 8 (63) SR 3006 OVER WINDFALL RUN, LAFAYETTE 9 TOWNSHIP RUN, BRIDGE REPLACEMENT 83,000 10 (BASE PROJECT ALLOCATION - $42,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $21,000) 13 (64) SR 4007 OVER TOAD HOLLOW CREEK, 14 BRADFORD TOWNSHIP, BRIDGE REPLACEMENT 107,000 15 (BASE PROJECT ALLOCATION - $58,000) 16 (LAND ALLOCATION - $20,000) 17 (DESIGN AND CONTINGENCIES - $29,000) 18 Section 47. Mercer County. 19 (a) Local Bridges 20 (1) Delaware Township, Line Road, Br.1415 21 over Branch of Shenango River, Bridge 22 Replacement 430,000 23 (Base Project Allocation - $300,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $120,000) 26 (2) Delaware Township, Pew Road, Br.1412 27 over Branch of Shenango River, Bridge 28 Replacement 380,000 29 (Base Project Allocation - $250,000) 30 (Land Allocation - $10,000) 20080S1503B2474 - 259 -
1 (Design and Contingencies - $120,000) 2 (3) Shenango Township, Oak Hill Road, Br. 3 2809 over Turkey Run, Bridge 4 Replacement 660,000 5 (Base Project Allocation - $500,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $150,000) 8 (4) Shenango Township, Heasley Road, Br. 9 2805 over Branch of Shenango River, 10 Bridge Replacement 510,000 11 (Base Project Allocation - $350,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $150,000) 14 (5) Hermitage Township, Sample Road, Br. 15 2326 over Hogback Run, Bridge 16 Replacement 390,000 17 (Base Project Allocation - $250,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $120,000) 20 (6) City of Sharon, Wengler Avenue, Br. 21 2329 over Pine Run, Bridge Replacement 930,000 22 (Base Project Allocation - $700,000) 23 (Land Allocation - $30,000) 24 (Design and Contingencies - $200,000) 25 (7) Greene Township, West County Line 26 Road, Br.199 over Branch of Shenango 27 River, Bridge Replacement 910,000 28 (Base Project Allocation - $700,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $200,000) 20080S1503B2474 - 260 -
1 (8) Lake Township, Parker Road, Br.2116 2 over Fox Run, Bridge Replacement 510,000 3 (Base Project Allocation - $350,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $150,000) 6 (9) Sandy Creek Township, Old Perry 7 Highway, Br.408 over Sandy Creek, 8 Bridge Rehabilitation 275,000 9 (Base Project Allocation - $200,000) 10 (Design and Contingencies - $75,000) 11 (10) Sandy Creek Township, Bishop Road, 12 Br. 402 over Sandy Creek, Bridge 13 Rehabilitation 275,000 14 (Base Project Allocation - $200,000) 15 (Design and Contingencies - $75,000) 16 (11) Millcreek Township, Foster Road, Br. 17 1203 over Mill Creek, Bridge 18 Rehabilitation 250,000 19 (Base Project Allocation - $175,000) 20 (Design and Contingencies - $75,000) 21 (12) Wolf Creek Township, Montgomery Dam 22 Road, Br. 2704 over Wolf Creek, Bridge 23 Rehabilitation 275,000 24 (Base Project Allocation - $200,000) 25 (Design and Contingencies - $75,000) 26 (13) Springfield Township, Old Mercer 27 Road, Br. 3001 over Pine Creek, Bridge 28 Rehabilitation 275,000 29 (Base Project Allocation - $200,000) 30 (Design and Contingencies - $75,000) 20080S1503B2474 - 261 -
1 (14) French Creek Township, Creek Road, 2 Br. 611 over North Deer Creek, Bridge 3 Rehabilitation 275,000 4 (Base Project Allocation - $200,000) 5 (Design and Contingencies - $75,000) 6 (15) Otter Creek Township, Straub Road, 7 Br. 906 over Branch of Otter Creek, 8 Bridge Rehabilitation 250,000 9 (Base Project Allocation - $175,000) 10 (Design and Contingencies - $75,000) 11 (16) Delaware Township, Line Road, Br. 12 1415 over Branch of Shenango River, 13 Bridge Replacement 430,000 14 (Base Project Allocation - $300,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $120,000) 17 (17) Delaware Township, Pew Road, Br. 1412 18 over Branch of Shenango River, Bridge 19 Replacement 380,000 20 (Base Project Allocation - $250,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $120,000) 23 (18) Shenango Township, Oak Hill Road, Br. 24 2809 over Turkey Run, Bridge 25 Replacement 660,000 26 (Base Project Allocation - $500,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $150,000) 29 (19) Shenango Township, Heasley Road, Br. 30 2805 over Branch of Shenango River, 20080S1503B2474 - 262 -
1 Bridge Replacement 510,000 2 (Base Project Allocation - $350,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $150,000) 5 (20) City of Hermitage, Sample Road, Br. 6 2326 over Hogback Run, Bridge 7 Replacement 390,000 8 (Base Project Allocation - $250,000) 9 (Land Allocation - $20,000) 10 (Design and Contingencies - $120,000) 11 (21) City of Sharon, Wengler Avenue, Br. 12 2329 over Pine Run, Bridge Replacement 930,000 13 (Base Project Allocation - $700,000) 14 (Land Allocation - $30,000) 15 (Design and Contingencies - $200,000) 16 (22) Greene Township, West County Line 17 Road, Br. 199 over Branch of Shenango 18 River, Bridge Replacement 910,000 19 (Base Project Allocation - $700,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $200,000) 22 (23) Lake Township, Parker Road, Br. 2116 23 over Fox Run, Bridge Replacement 510,000 24 (Base Project Allocation - $350,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $150,000) 27 (24) Sandy Creek Township, Old Perry 28 Highway, Br. 408 over Sandy Creek, 29 Bridge Rehabilitation 275,000 30 (Base Project Allocation - $200,000) 20080S1503B2474 - 263 -
1 (Design and Contingencies - $75,000) 2 (25) Sandy Creek Township, Bishop Road, 3 Br. 402 over Sandy Creek, Bridge 4 Rehabilitation 275,000 5 (Base Project Allocation - $200,000) 6 (Design and Contingencies - $75,000) 7 (26) Millcreek Township, Foster Road, Br. 8 1203 over Mill Creek, Bridge 9 Rehabilitation 250,000 10 (Base Project Allocation - $175,000) 11 (Design and Contingencies - $75,000) 12 (27) Wolf Creek Township, Montgomery Dam 13 Road, Br. 2704 over Wolf Creek, Bridge 14 Rehabilitation 275,000 15 (Base Project Allocation - $200,000) 16 (Design and Contingencies - $75,000) 17 (28) Springfield Township, Old Mercer 18 Road, Br. 3001 over Pine Creek, Bridge 19 Rehabilitation 275,000 20 (Base Project Allocation - $200,000) 21 (Design and Contingencies - $75,000) 22 (29) French Creek Township, Creek Road, 23 Br. 611 over North Deer Creek, Bridge 24 Rehabilitation 275,000 25 (Base Project Allocation - $200,000) 26 (Design and Contingencies - $75,000) 27 (30) Otter Creek Township, Straub Road, 28 Br. 906 over Branch of Otter Creek, 29 Bridge Rehabilitation 250,000 30 (Base Project Allocation - $175,000) 20080S1503B2474 - 264 -
1 (Design and Contingencies - $75,000) 2 (31) CITY OF HERMITAGE, SAMPLE ROAD, <-- 3 BRIDGE NO.2326 OVER HOGBACK RUN, BRIDGE 4 REPLACEMENT 390,000 5 (BASE PROJECT ALLOCATION - $390,000) 6 (32) LAKE TOWNSHIP, PARKER ROAD, BRIDGE 7 NO.2116 OVER FOX RUN, BRIDGE 8 REPLACEMENT 510,000 9 (BASE PROJECT ALLOCATION - $510,000) 10 (33) SANDY CREEK TOWNSHIP, OLD PERRY 11 HIGHWAY, BRIDGE NO.408 OVER SANDY 12 CREEK, BRIDGE REHABILITATION 275,000 13 (BASE PROJECT ALLOCATION - $275,000) 14 (b) State Bridges 15 (1) SR 0018 over Shenango River, Clark 16 Borough, Bridge Rehabilitation 4,150,000 17 (Base Project Allocation - $4,000,000) 18 (Design and Contingencies - $150,000) 19 (2) SR 0318 over Tributary of Beaver Run, 20 East Lackawannock Township, Bridge 21 Rehabilitation 36,000 22 (Base Project Allocation - $36,000) 23 (3) SR 2019 over SR 0079, Lake Township, 24 Bridge Rehabilitation 2,200,000 25 (Base Project Allocation - $2,000,000) 26 (Design and Contingencies - $200,000) 27 (4) SR 0019 over Little Shenango River, 28 Perry Township, Bridge Replacement 150,000 29 (Base Project Allocation - $80,000) 30 (Land Allocation - $10,000) 20080S1503B2474 - 265 -
1 (Design and Contingencies - $60,000) 2 (5) SR 0019, Perry Highway over Little 3 Shenango River, Perry Township, Bridge 4 Rehabilitation 36,000 5 (Base Project Allocation - $36,000) 6 (6) SR 0019, Perry Highway over Millner 7 Run, Perry Township, Bridge 8 Rehabilitation 13,000 9 (Base Project Allocation - $13,000) 10 (7) SR 0019 over Black Run, Sandy Creek 11 Township, Bridge Replacement 1,350,000 12 (Base Project Allocation - $1,000,000) 13 (Design and Contingencies - $350,000) 14 (8) SR 0018, New Castle Road over Hog Back 15 Run, Shenango Township, Bridge 16 Rehabilitation 36,000 17 (Base Project Allocation - $36,000) 18 (9) SR 0551, Pulaski Road over Tributary 19 of Shenango River, Shenango Township, 20 Bridge Rehabilitation 13,000 21 (Base Project Allocation - $13,000) 22 (10) SR 0019, Perry Highway over Johnston 23 Run, Springfield Township, Bridge 24 Rehabilitation 12,000 25 (Base Project Allocation - $12,000) 26 (11) SR 0019, Perry Highway over Small 27 Stream, Springfield Township, Bridge 28 Rehabilitation 13,000 29 (Base Project Allocation - $13,000) 30 (12) SR 0358, Vernon Road over Branch of 20080S1503B2474 - 266 -
1 Booth Run, West Salem Township, Bridge 2 Rehabilitation 13,000 3 (Base Project Allocation - $13,000) 4 (13) SR 0173 over Mill Creek, Worth 5 Township, Bridge Replacement 950,000 6 (Base Project Allocation - $700,000) 7 (Design and Contingencies - $250,000) 8 Section 48. Mifflin County. 9 (a) Local Bridges 10 (1) Decatur Township, T-737 over Tributary 11 of Meadow Creek, Bridge Replacement 154,000 12 (Base Project Allocation - $154,000) 13 (2) MENNO TOWNSHIP, T-342 OVER <-- 14 KISHACOQUILLAS CREEK, BRIDGE 15 REPLACEMENT 300,000 16 (BASE PROJECT ALLOCATION - $200,000) 17 (LAND ALLOCATION - $50,000) 18 (DESIGN AND CONTINGENCIES - $50,000) 19 (b) State Bridges 20 (1) SR 1002 over Honey Creek, Armagh 21 Township, Bridge Replacement 300,000 22 (Base Project Allocation - $200,000) 23 (Design and Contingencies - $100,000) 24 (2) SR 1005 over Laurel Run, Armagh 25 Township, Bridge Replacement 1,600,000 26 (Base Project Allocation - $1,000,000) 27 (Land Allocation - $300,000) 28 (Design and Contingencies - $300,000) 29 (3) SR 2002 over Belltown Run, Decatur 30 Township, Bridge Replacement 300,000 20080S1503B2474 - 267 -
1 (Base Project Allocation - $200,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $50,000) 4 (4) SR 0022 over Valley Road, Derry 5 Township, Bridge Rehabilitation 856,000 6 (Base Project Allocation - $780,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $56,000) 9 (5) SR 0022 over TR T315, Jacks Creek, 10 Derry Township, Bridge Rehabilitation 856,000 11 (Base Project Allocation - $780,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $56,000) 14 (6) SR 2001 over Tributary of Jacks Creek, 15 Derry Township, Bridge Replacement 3,375,000 16 (Base Project Allocation - $2,500,000) 17 (Land Allocation - $175,000) 18 (Design and Contingencies - $700,000) 19 (7) SR 2001 over Jacks Creek, Derry 20 Township, Bridge Replacement 1,600,000 21 (Base Project Allocation - $1,000,000) 22 (Land Allocation - $300,000) 23 (Design and Contingencies - $300,000) 24 (8) SR 0103 over Tributary of Juniata 25 River, Granville Township, Bridge 26 Replacement 215,000 27 (Base Project Allocation - $140,000) 28 (Design and Contingencies - $75,000) 29 (9) SR 3017 over Tributary of Juniata 30 River, Wayne Township, Bridge 20080S1503B2474 - 268 -
1 Replacement 216,000 2 (Base Project Allocation - $140,000) 3 (Land Allocation - $30,000) 4 (Design and Contingencies - $46,000) 5 (10) SR 0022 OVER SR 8018 AND KISH CREEK, <-- 6 DERRY TOWNSHIP, BRIDGE REPLACEMENT 1,388,000 7 (BASE PROJECT ALLOCATION - $912,000) 8 (LAND ALLOCATION - $20,000) 9 (DESIGN AND CONTINGENCIES - $456,000) 10 (11) SR 0022 OVER TOWN RUN, OLIVER 11 TOWNSHIP, BRIDGE REPLACEMENT 80,000 12 (BASE PROJECT ALLOCATION - $40,000) 13 (LAND ALLOCATION - $20,000) 14 (DESIGN AND CONTINGENCIES - $20,000) 15 (12) SR 0022, BRIDGE NO.26357 OVER BRANCH 16 OF LONG HOLLOW RUN, WAYNE TOWNSHIP, 17 BRIDGE REPLACEMENT 67,000 18 (BASE PROJECT ALLOCATION - $31,000) 19 (LAND ALLOCATION - $20,000) 20 (DESIGN AND CONTINGENCIES - $16,00) 21 (13) SR 0022, BRIDGE NO.26361 OVER BRANCH 22 OF LONG HOLLOW RUN, WAYNE TOWNSHIP, 23 BRIDGE REPLACEMENT 121,000 24 (BASE PROJECT ALLOCATION - $67,000) 25 (LAND ALLOCATION - $20,000) 26 (DESIGN AND CONTINGENCIES - $34,000) 27 (14) SR 0022, BRIDGE NO.26363 OVER 28 TRIBUTARY OF JUNIATA RIVER, OLIVER 29 TOWNSHIP, BRIDGE REPLACEMENT 92,000 30 (BASE PROJECT ALLOCATION - $48,000) 20080S1503B2474 - 269 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $24,000) 3 (15) SR 0022, BRIDGE NO.26368 OVER 4 TRIBUTARY OF JUNIATA RIVER, OLIVER 5 TOWNSHIP, BRIDGE REPLACEMENT 152,000 6 (BASE PROJECT ALLOCATION - $88,000) 7 (LAND ALLOCATION - $20,000) 8 (DESIGN AND CONTINGENCIES - $44,000) 9 (16) SR 0322, BRIDGE NO.26429 OVER 10 KISHACOQUILLAS C CONRAIL, BROWN 11 TOWNSHIP, BRIDGE REPLACEMENT 2,084,000 12 (BASE PROJECT ALLOCATION - $1,376,000) 13 (LAND ALLOCATION - $20,000) 14 (DESIGN AND CONTINGENCIES - $688,000) 15 (17) SR 0322, BRIDGE NO.26431 OVER 16 KISHACOQUILLAS C CONRAIL, BROWN 17 TOWNSHIP, BRIDGE REPLACEMENT 2,084,000 18 (BASE PROJECT ALLOCATION - $1,376,000) 19 (LAND ALLOCATION - $20,000) 20 (DESIGN AND CONTINGENCIES - $688,000) 21 (18) SR 0322, BRIDGE NO.26432 OVER 22 KISHACOQUILLAS C CONRAIL, BROWN 23 TOWNSHIP, BRIDGE REPLACEMENT 2,276,000 24 (BASE PROJECT ALLOCATION - $1,504,000) 25 (LAND ALLOCATION - $20,000) 26 (DESIGN AND CONTINGENCIES - $752,000) 27 (19) SR 0522 OVER JACKS CREEK, DECATUR 28 TOWNSHIP, BRIDGE REPLACEMENT 296,000 29 (BASE PROJECT ALLOCATION - $184,000) 30 (LAND ALLOCATION - $20,000) 20080S1503B2474 - 270 -
1 (DESIGN AND CONTINGENCIES - $92,000) 2 (20) SR 0655 OVER ALEXANDER RUN, UNION 3 TOWNSHIP, BRIDGE REPLACEMENT 74,000 4 (BASE PROJECT ALLOCATION - $36,000) 5 (LAND ALLOCATION - $20,000) 6 (DESIGN AND CONTINGENCIES - $18,000) 7 (21) SR 1002 OVER DRY CREEK, ARMAGH 8 TOWNSHIP, BRIDGE REPLACEMENT 164,000 9 (BASE PROJECT ALLOCATION - $96,000) 10 (LAND ALLOCATION - $20,000) 11 (DESIGN AND CONTINGENCIES - $48,000) 12 (22) SR 1005 OVER LAUREL CREEK, ARMAGH 13 TOWNSHIP, BRIDGE REPLACEMENT 392,000 14 (BASE PROJECT ALLOCATION - $248,000) 15 (LAND ALLOCATION - $20,000) 16 (DESIGN AND CONTINGENCIES - $124,000) 17 (23) SR 1005 OVER MILL RACE, ARMAGH 18 TOWNSHIP, BRIDGE REPLACEMENT 192,000 19 (BASE PROJECT ALLOCATION - $115,000) 20 (LAND ALLOCATION - $20,000) 21 (DESIGN AND CONTINGENCIES - $57,000) 22 (24) SR 1005 OVER HONEY CREEK, BROWN 23 TOWNSHIP, BRIDGE REHABILITATION 620,000 24 (BASE PROJECT ALLOCATION - $570,000) 25 (LAND ALLOCATION - $50,000) 26 (25) SR 2001 OVER TRIBUTARY OF JACKS 27 CREEK, DERRY TOWNSHIP, BRIDGE 28 REPLACEMENT 140,000 29 (BASE PROJECT ALLOCATION - $80,000) 30 (LAND ALLOCATION - $20,000) 20080S1503B2474 - 271 -
1 (DESIGN AND CONTINGENCIES - $40,000) 2 (26) SR 2002 OVER TRIBUTARY OF JACKS 3 CREEK, DECATUR TOWNSHIP, BRIDGE 4 REPLACEMENT 61,000 5 (BASE PROJECT ALLOCATION - $30,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $11,000) 8 (27) SR 2004 OVER SR 0322, PA 322, DERRY 9 TOWNSHIP, BRIDGE REPLACEMENT 548,000 10 (BASE PROJECT ALLOCATION - $352,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $176,000) 13 (28) SR 3006, BRIDGE NO.26378 OVER SR 14 8005, LEWISTOWN BOROUGH, BRIDGE 15 REPLACEMENT 488,000 16 (BASE PROJECT ALLOCATION - $312,000) 17 (LAND ALLOCATION - $20,000) 18 (DESIGN AND CONTINGENCIES - $156,000) 19 (29) SR 3006, BRIDGE NO.26381 OVER SR 20 8005, LEWISTOWN BOROUGH, BRIDGE 21 REPLACEMENT 488,000 22 (BASE PROJECT ALLOCATION - $312,000) 23 (LAND ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $156,000) 25 (30) SR 3017 OVER TRIBUTARY OF JUNIATA 26 RIVER, WAYNE TOWNSHIP, BRIDGE 27 REPLACEMENT 68,000 28 (BASE PROJECT ALLOCATION - $32,000) 29 (LAND ALLOCATION - $20,000) 30 (DESIGN AND CONTINGENCIES - $16,000) 20080S1503B2474 - 272 -
1 (31) SR 3017 OVER BEAVER DAM RUN, WAYNE 2 TOWNSHIP, BRIDGE REPLACEMENT 212,000 3 (BASE PROJECT ALLOCATION - $128,000) 4 (LAND ALLOCATION - $20,000) 5 (DESIGN AND CONTINGENCIES - $64,000) 6 (32) SR 4013 OVER STRODES RUN, GRANVILLE 7 TOWNSHIP, BRIDGE REPLACEMENT 124,000 8 (BASE PROJECT ALLOCATION - $69,000) 9 (LAND ALLOCATION - $20,000) 10 (DESIGN AND CONTINGENCIES - $35,000) 11 (33) SR 4013 OVER TRIBUTARY OF BEAVER DAM 12 RUN, WAYNE TOWNSHIP, BRIDGE 13 REPLACEMENT 59,000 14 (BASE PROJECT ALLOCATION - $30,000) 15 (LAND ALLOCATION - $20,000) 16 (DESIGN AND CONTINGENCIES - $9,000) 17 Section 49. Monroe County. 18 (a) Local Bridges 19 (1) Smithfield Township, Twin Falls Road 20 Bridge over Marshalls Creek, Bridge 21 Replacement 500,000 22 (Base Project Allocation - $500,000) 23 (2) EAST STROUDSBURG BOROUGH, MONROE <-- 24 COUNTY RAIL AUTHORITY, BRIDGE 25 REHABILITATION 724,000 26 (BASE PROJECT ALLOCATION - $507,000) 27 (DESIGN AND CONTINGENCIES - $217,000) 28 (b) State Bridges 29 (1) SR 2003 over Cherry Creek, Hamilton 30 Township, Bridge Replacement 1,550,000 20080S1503B2474 - 273 -
1 (Base Project Allocation - $750,000) 2 (Land Allocation - $100,000) 3 (Design and Contingencies - $700,000) 4 (2) PA 191, LR 169 OVER BRODHEAD CREEK OLD <-- 5 CHANNEL, STROUD TOWNSHIP, BRIDGE 6 REHABILITATION 413,000 7 (BASE PROJECT ALLOCATION - $289,000) 8 (DESIGN AND CONTINGENCIES - $124,000) 9 (3) SR 1008, LR 45029 OVER BRODHEAD CREEK, 10 BARRETT TOWNSHIP, BRIDGE 11 REHABILITATION 409,000 12 (BASE PROJECT ALLOCATION - $286,000) 13 (DESIGN AND CONTINGENCIES - $123,000) 14 (4) SR 1017, LR 45070 OVER BUCKHILL CREEK, 15 BARRETT TOWNSHIP, BRIDGE 16 REHABILITATION 520,000 17 (BASE PROJECT ALLOCATION - $364,000) 18 (DESIGN AND CONTINGENCIES - $156,000) 19 (5) SR 0115, LR 45049 OVER POPLAR CREEK, 20 CHESTNUTHILL TOWNSHIP, BRIDGE 21 REHABILITATION 123,000 22 (BASE PROJECT ALLOCATION - $86,000) 23 (DESIGN AND CONTINGENCIES - $37,000 24 (6) SR 0191, LR 169 OVER PARADISE CREEK, 25 PARADISE TOWNSHIP, BRIDGE 26 REHABILITATION 552,000 27 (BASE PROJECT ALLOCATION - $386,000) 28 (DESIGN AND CONTINGENCIES - $166,000) 29 (7) SR 2003, LR 45007 OVER CHERRY CREEK, 30 HAMILTON TOWNSHIP, BRIDGE REPLACEMENT 805,000 20080S1503B2474 - 274 -
1 (BASE PROJECT ALLOCATION - $655,000) 2 (DESIGN AND CONTINGENCIES - $150,000) 3 (8) SR 2006, LR 45010 OVER CALDENA CREEK, 4 SMITHFIELD TOWNSHIP, BRIDGE 5 REHABILITATION 58,000 6 (BASE PROJECT ALLOCATION - $40,000) 7 (DESIGN AND CONTINGENCIES - $18,000) 8 (9) SR 2012, LR 164SP. OVER MCMICHAELS 9 CREEK, HAMILTON TOWNSHIP, BRIDGE 10 REHABILITATION 476,000 11 (BASE PROJECT ALLOCATION - $333,000) 12 (DESIGN AND CONTINGENCIES - $143,000) 13 (10) SR 2036, SHIFFERS ROAD OVER PA 33, LR 14 796, HAMILTON TOWNSHIP, BRIDGE 15 REHABILITATION 610,000 16 (BASE PROJECT ALLOCATION - $427,000) 17 (DESIGN AND CONTINGENCIES - $183,000) 18 (11) SR 0209, LR 164 OVER MIDDLE CREEK, 19 POLK TOWNSHIP, BRIDGE REHABILITATION 430,000 20 (BASE PROJECT ALLOCATION - $301,000) 21 (DESIGN AND CONTINGENCIES - $129,000) 22 (12) SR 3003, LR 560 OVER CHAPPLE CREEK, 23 ELDRED TOWNSHIP, BRIDGE REHABILITATION 115,000 24 (BASE PROJECT ALLOCATION - $80,000) 25 (DESIGN AND CONTINGENCIES - $35,000) 26 (13) SR 3009, 45066, T-939, BRIDGE 27 NO.27012 OVER POHOPOCO CREEK, 28 CHESTNUTHILL TOWNSHIP, BRIDGE 29 REHABILITATION 175,000 30 (BASE PROJECT ALLOCATION - $122,000) 20080S1503B2474 - 275 -
1 (DESIGN AND CONTINGENCIES - $53,000) 2 (14) SR 3009, 45066, T-939, BRIDGE 3 NO.27013 OVER POHOPOCO CREEK, 4 CHESTNUTHILL TOWNSHIP, BRIDGE 5 REHABILITATION 173,000 6 (BASE PROJECT ALLOCATION - $121,000) 7 (DESIGN AND CONTINGENCIES - $52,000) 8 (15) SR 3010, LR 45053 OVER POHOPOCO 9 CREEK, POLK TOWNSHIP, BRIDGE 10 REHABILITATION 540,000 11 (BASE PROJECT ALLOCATION - $378,000) 12 (DESIGN AND CONTINGENCIES - $162,000) 13 (16) SR 3017, LR 165 OVER ROSS COMMON 14 CREEK, ROSS TOWNSHIP, BRIDGE 15 REHABILITATION 80,000 16 (BASE PROJECT ALLOCATION - $56,000) 17 (DESIGN AND CONTINGENCIES - $24,000) 18 (17) SR 3023, LR 949 OVER MILL RACE, 19 HAMILTON TOWNSHIP, BRIDGE 20 REHABILITATION 63,000 21 (BASE PROJECT ALLOCATION - $44,000) 22 (DESIGN AND CONTINGENCIES - $19,000) 23 (18) SR 3023, LR 949 OVER KETTLE CREEK, 24 HAMILTON TOWNSHIP, BRIDGE 25 REHABILITATION 400,000 26 (BASE PROJECT ALLOCATION - $280,000) 27 (DESIGN AND CONTINGENCIES - $120,000) 28 (19) SR 3024, LR 45087 OVER TRIBUTARY OF 29 APPENZELL CREEK, JACKSON TOWNSHIP, 30 BRIDGE REHABILITATION 90,000 20080S1503B2474 - 276 -
1 (BASE PROJECT ALLOCATION - $75,000) 2 (DESIGN AND CONTINGENCIES - $15,000) 3 (20) SR 0033, LR 796, 0.4 MILE SOUTH OF I- 4 80 OVER POCONO CREEK, HAMILTON 5 TOWNSHIP, BRIDGE REHABILITATION 1,035,000 6 (LAND ALLOCATION - $197,000) 7 (DESIGN AND CONTINGENCIES - $838,000) 8 (21) SR 4002, LR 45040 OVER TUNKHANNOCK 9 CREEK, TUNKHANNOCK TOWNSHIP, BRIDGE 10 REHABILITATION 669,000 11 (BASE PROJECT ALLOCATION - $468,000) 12 (DESIGN AND CONTINGENCIES - $201,000) 13 (22) SR 4003, LR 45039 OVER TROUT CREEK, 14 TOBYHANNA TOWNSHIP, BRIDGE 15 REHABILITATION 285,000 16 (BASE PROJECT ALLOCATION - $199,000) 17 (DESIGN AND CONTINGENCIES - $86,000) 18 (23) SR 4003, LR 48039 OVER DEEP RUN, 19 TOBYHANNA TOWNSHIP, BRIDGE 20 REHABILITATION 100,000 21 (BASE PROJECT ALLOCATION - $70,000) 22 (DESIGN AND CONTINGENCIES - $30,000) 23 (24) SR 0423, LR 561 OVER 17 MILE CREEK, 24 COOLBAUGH TOWNSHIP, BRIDGE 25 REHABILITATION 69,000 26 (BASE PROJECT ALLOCATION - $48,000) 27 (DESIGN AND CONTINGENCIES - $21,000) 28 (25) SR 0447, LR 324 OVER GOOSE POND RUN, 29 BARRETT TOWNSHIP, BRIDGE 30 REHABILITATION 209,000 20080S1503B2474 - 277 -
1 (BASE PROJECT ALLOCATION - $146,000) 2 (DESIGN AND CONTINGENCIES - $63,000) 3 (26) SR 0611, LR 168 OVER BIG MEADOW 4 CREEK, STROUD TOWNSHIP, BRIDGE 5 REHABILITATION 146,000 6 (BASE PROJECT ALLOCATION - $102,000) 7 (DESIGN AND CONTINGENCIES - $44,000) 8 (27) SR 0715, LR 45041 OVER MCMICHAELS 9 CREEK, CHESTNUTHILL TOWNSHIP, BRIDGE 10 REHABILITATION 349,000 11 (BASE PROJECT ALLOCATION - $244,000) 12 (DESIGN AND CONTINGENCIES - $105,000) 13 (28) SR 0080, LR 794 OVER T-663, RIVER 14 ROAD, SMITHFIELD TOWNSHIP, BRIDGE 15 REHABILITATION 593,000 16 (BASE PROJECT ALLOCATION - $415,000) 17 (DESIGN AND CONTINGENCIES - $178,000) 18 (29) SR 8004, LR 1002 RAMP OVER SR 0380 19 SOUTHBOUND, LR 1002, JACKSON TOWNSHIP, 20 BRIDGE REHABILITATION 932,000 21 (BASE PROJECT ALLOCATION - $652,000) 22 (DESIGN AND CONTINGENCIES - $280,000) 23 (30) SR 0940, LR 169 OVER DAVEY RUN, 24 TOBYHANNA TOWNSHIP, BRIDGE 25 REHABILITATION 322,000 26 (BASE PROJECT ALLOCATION - $225,000) 27 (DESIGN AND CONTINGENCIES - $97,000) 28 (31) SR 0940, LR 169 OVER UPPER 29 TUNKHANNOCK CREEK, TOBYAHNNA TOWNSHIP, 30 BRIDGE REHABILITATION 470,000 20080S1503B2474 - 278 -
1 (BASE PROJECT ALLOCATION - $329,000) 2 (DESIGN AND CONTINGENCIES - $141,000) 3 (32) US 209 BUSINESS, LR 164 OVER 4 APPENZELL CREEK, HAMILTON TOWNSHIP, 5 BRIDGE REHABILITATION 260,000 6 (BASE PROJECT ALLOCATION - $182,000) 7 (DESIGN AND CONTINGENCIES - $78,000) 8 (33) US 209 BUSINESS, LR 164 OVER KETTLE 9 CREEK, HAMILTON TOWNSHIP, BRIDGE 10 REHABILITATION 250,000 11 (BASE PROJECT ALLOCATION - $175,000) 12 (DESIGN AND CONTINGENCIES - $75,000) 13 Section 50. Montgomery County. 14 (a) Local Bridges 15 (1) Whitemarsh Township, Valley Road over 16 Wissahickon Creek, Bridge Replacement 710,000 17 (Base Project Allocation - $225,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $475,000) 20 (2) Horsham Township, Keith Valley Road 21 over Park Creek, Bridge Replacement 1,550,000 22 (Base Project Allocation - $1,300,000) 23 (Land Allocation - $50,000) 24 (Design and Contingencies - $200,000) 25 (3) Horsham Township, Davis Grove Road 26 over Park Creek, Bridge Replacement 1,550,000 27 (Base Project Allocation - $1,300,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $200,000) 30 (4) Upper Gwynedd Township, Sumneytown 20080S1503B2474 - 279 -
1 Pike over Sumneytown Pike, Bridge 2 Replacement 7,500,000 3 (Base Project Allocation - $7,500,000) 4 (5) Upper Dublin Township, Butler Pike 5 over Wissahickon Creek, Bridge No.1, 6 Bridge Replacement 4,100,000 7 (Base Project Allocation - $3,500,000) 8 (Land Allocation - $100,000) 9 (Design and Contingencies - $500,000) 10 (6) Upper Dublin Township, Butler Pike 11 over Wissahickon Creek, Bridge No.2, 12 Bridge Replacement 700,000 13 (Base Project Allocation - $500,000) 14 (Design and Contingencies - $200,000) 15 (7) New Hanover Township, Lutheran Road 16 over Tributary of Minister Creek, 17 Bridge Replacement 1,750,000 18 (Base Project Allocation - $1,750,000) 19 (8) Towamencin Township, Rittenhouse Road 20 over Skippack Creek, Bridge 21 Restoration 1,000,000 22 (Base Project Allocation - $1,000,000) 23 (9) Lower Salford Township, Bergeys Mill 24 Road over East Branch of Perkiomen 25 Creek, Bridge Replacement 2,350,000 26 (Base Project Allocation - $2,350,000) 27 (10) Lower Salford Township, Camp Wawa 28 Road over East Branch of Perkiomen 29 Creek, Bridge Replacement 2,550,000 30 (Base Project Allocation - $2,550,000) 20080S1503B2474 - 280 -
1 (11) Upper Hanover Township, Eleventh 2 Street over Macoby Creek, Bridge 3 Rehabilitation 600,000 4 (Base Project Allocation - $600,000) 5 (12) Norristown Borough, Sterigere Street 6 over Stony Creek, Bridge 7 Rehabilitation 2,400,000 8 (Base Project Allocation - $2,400,000) 9 (13) LOWER STALFORD TOWNSHIP, CAMP WAWA <-- 10 ROAD, BRIDGE REHABILITATION 2,550,000 11 (BASE PROJECT ALLOCATION - $2,500,000) 12 (LAND ALLOCATION - $50,000) 13 (14) HATFIELD TOWNSHIP, LINE LEXINGTON 14 ROAD OVER NESHAMINY CREEK, BRIDGE 15 REPLACEMENT 2,850,000 16 (BASE PROJECT ALLOCATION - $2,250,000) 17 (LAND ALLOCATION - $100,000) 18 (DESIGN AND CONTINGENCIES - $500,000) 19 (15) HATFIELD TOWNSHIP, SCHWAB ROAD BRIDGE 20 OVER TRIBUTARY OF WEST NESHAMINY CREEK, 21 BRIDGE REPLACEMENT 1,650,000 22 (BASE PROJECT ALLOCATION - $1,500,000) 23 (LAND ALLOCATION - $50,000) 24 (DESIGN AND CONTINGENCIES - $100,000) 25 (16) LOWER SALFORD TOWNSHIP, BERGEYS MILL 26 ROAD, BRIDGE REHABILITATION 2,350,000 27 (BASE PROJECT ALLOCATION - $2,000,000) 28 (LAND ALLOCATION - $50,000) 29 (DESIGN AND CONTINGENCIES - $300,000) 30 (17) NORRISTOWN BOROUGH, STERIGERE STREET 20080S1503B2474 - 281 -
1 BRIDGE, BRIDGE REHABILITATION 2,400,000 2 (BASE PROJECT ALLOCATION - $2,000,000) 3 (LAND ALLOCATION - $100,000) 4 (DESIGN AND CONTINGENCIES - $300,000) 5 (b) State Bridges 6 (1) SR 0232, Huntingdon Pike over 7 Pennypack Creek, Abington Township, 8 Bridge Rehabilitation 63,000 9 (Base Project Allocation - $11,000) 10 (Land Allocation - $1,000) 11 (Design and Contingencies - $51,000) 12 (2) SR 0152, Limekiln Pike over SEPTA, 13 Abington Township, Bridge 14 Rehabilitation 2,900,000 15 (Base Project Allocation - $2,000,000) 16 (Land Allocation - $500,000) 17 (Design and Contingencies - $400,000) 18 (3) SR 0202, Dekalb Pike over Norfolk 19 Southern, Bridgeport Borough, Bridge 20 Rehabilitation 63,000 21 (Base Project Allocation - $11,000) 22 (Land Allocation - $1,000) 23 (Design and Contingencies - $51,000) 24 (4) SR 1050, Congo Road over Middle Creek, 25 Douglass Township, Bridge 26 Rehabilitation 63,000 27 (Base Project Allocation - $11,000) 28 (Land Allocation - $1,000) 29 (Design and Contingencies - $51,000) 30 (5) SR 8012, Ramp F over City Line Avenue 20080S1503B2474 - 282 -
1 North Bound Ramp, Lower Merion 2 Township, Bridge Rehabilitation 2,000,000 3 (Base Project Allocation - $2,000,000) 4 (6) SR 8012, Ramp G over Ramp B, Ramp C, 5 Lower Merion Township, Bridge 6 Rehabilitation 2,000,000 7 (Base Project Allocation - $2,000,000) 8 (7) SR 0076, Schuylkill Expressway over 9 Gulley Run, Lower Merion Township, 10 Bridge Rehabilitation 63,000 11 (Base Project Allocation - $11,000) 12 (Land Allocation - $1,000) 13 (Design and Contingencies - $51,000) 14 (8) SR 0076, Schuylkill Expressway over 15 Mill Creek, Mill Creek Road, Lower 16 Merion Township, Bridge Rehabilitation 63,000 17 (Base Project Allocation - $11,000) 18 (Land Allocation - $1,000) 19 (Design and Contingencies - $51,000) 20 (9) SR 0076, Schuylkill Expressway over 21 CONRAIL Railroad, Lower Merion 22 Township, Bridge Rehabilitation 2,000,000 23 (Base Project Allocation - $2,000,000) 24 (10) SR 0076, Schuylkill Expressway over 25 Belmont Avenue, Lower Merion Township, 26 Bridge Rehabilitation 2,000,000 27 (Base Project Allocation - $2,000,000) 28 (11) SR 0076, Schuylkill Expressway over 29 Ramp G from West Bound I-76, Lower 30 Merion Township, Bridge Rehabilitation 2,000,000 20080S1503B2474 - 283 -
1 (Base Project Allocation - $2,000,000) 2 (12) SR 0076, Schuylkill Expressway over 3 City Line Avenue, Ramp F, Lower Merion 4 Township, Bridge Rehabilitation 2,000,000 5 (Base Project Allocation - $2,000,000) 6 (13) SR 0076, Schuylkill Expressway over 7 City Line Avenue, Ramp C, Lower Merion 8 Township, Bridge Rehabilitation 2,000,000 9 (Base Project Allocation - $2,000,000) 10 (14) SR 0076, Schuylkill Expressway over 11 Hollow Road Creek, Lower Merion 12 Township, Bridge Rehabilitation 2,000,000 13 (Base Project Allocation - $2,000,000) 14 (15) SR 1030, Swamp Creek Road over Unami 15 Creek, Marlborough Township, Bridge 16 Rehabilitation 1,389,000 17 (Base Project Allocation - $96,000) 18 (Land Allocation - $31,000) 19 (Design and Contingencies - $1,262,000) 20 (16) Keim Street over Schuylkill River, 21 Pottstown Borough, Bridge Replacement 2,512,000 22 (Base Project Allocation - $2,250,000) 23 (Land Allocation - $22,000) 24 (Design and Contingencies - $240,000) 25 (17) TR 100 over Schuylkill River Road, 26 Pottstown Borough, Bridge 27 Rehabilitation 63,000 28 (Base Project Allocation - $11,000) 29 (Land Allocation - $1,000) 30 (Design and Contingencies - $51,000) 20080S1503B2474 - 284 -
1 (18) SR 4005, Mill Road over Skippack 2 Creek, Skippack Township, Bridge 3 Rehabilitation 1,389,000 4 (Base Project Allocation - $96,000) 5 (Land Allocation - $31,000) 6 (Design and Contingencies - $1,262,000) 7 (19) SR 2027, Pennsylvania Avenue over 8 Sandy Run, Springfield Township, Bridge 9 Replacement 3,500,000 10 (Base Project Allocation - $575,000) 11 (Land Allocation - $40,000) 12 (Design and Contingencies - $2,885,000) 13 (20) SR 1036, James Street over Macoby 14 Creek, Upper Hanover Township, Bridge 15 Rehabilitation 1,389,000 16 (Base Project Allocation - $96,000) 17 (Land Allocation - $31,000) 18 (Design and Contingencies - $1,262,000) 19 (21) SR 0663, Layfield Road over Perkiomen 20 Creek, Upper Hanover Township, Bridge 21 Rehabilitation 114,000 22 (Base Project Allocation - $11,000) 23 (Land Allocation - $1,000) 24 (Design and Contingencies - $102,000) 25 (22) SR 1044, Palm Hill Road over 26 Perkiomen Creek, Upper Hanover 27 Township, Bridge Rehabilitation 63,000 28 (Base Project Allocation - $11,000) 29 (Land Allocation - $1,000) 30 (Design and Contingencies - $51,000) 20080S1503B2474 - 285 -
1 (23) SR 1038, Quakertown Road over Branch 2 of Macoby Creek, Upper Hanover 3 Township, Bridge Rehabilitation 63,000 4 (Base Project Allocation - $11,000) 5 (Land Allocation - $1,000) 6 (Design and Contingencies - $51,000) 7 (24) SR 0422, County Line Road over 8 Schuylkill River, CONRAIL Railroad, 9 Upper Merion Township, Bridge 10 Rehabilitation 267,000 11 (Base Project Allocation - $267,000) 12 (25) SR 0076, Schuylkill Expressway over 13 North Gulph Road, Upper Merion 14 Township, Bridge Rehabilitation 2,000,000 15 (Base Project Allocation - $2,000,000) 16 (26) SR 0611, Old York Road over Branch of 17 Pennypack Creek, Upper Moreland 18 Township, Bridge Replacement 10,000,000 19 (Base Project Allocation - $863,000) 20 (Land Allocation - $200,000) 21 (Design and Contingencies - $8,937,000) 22 (27) SR 2040, Warminster Road over 23 Pennypack Creek, Upper Moreland 24 Township, Bridge Replacement 3,500,000 25 (Base Project Allocation - $863,000) 26 (Land Allocation - $55,000) 27 (Design and Contingencies - $2,582,000) 28 (28) SR 1024, Salford Station over Mill 29 Race, Upper Salford Township, Bridge 30 Replacement 2,326,000 20080S1503B2474 - 286 -
1 (Base Project Allocation - $2,000,000) 2 (Land Allocation - $25,000) 3 (Design and Contingencies - $301,000) 4 (29) SR 1024, Salford Station over 5 Perkiomen Creek, Upper Salford 6 Township, Bridge Replacement 6,926,000 7 (Base Project Allocation - $6,000,000) 8 (Land Allocation - $75,000) 9 (Design and Contingencies - $851,000) 10 (30) SR 0076, Schuylkill Expressway over 11 LR 46138, Arrowmink Creek, West 12 Conshohocken Borough, Bridge 13 Rehabilitation 2,000,000 14 (Base Project Allocation - $2,000,000) 15 (31) SR 0422, County Line Expressway over 16 Bike Path, West Norriton Township, 17 Bridge Rehabilitation 267,000 18 (Base Project Allocation - $267,000) 19 (32) SR 0422, County Line Expressway over 20 Indian Drive, West Norriton Township, 21 Bridge Rehabilitation 267,000 22 (Base Project Allocation - $267,000) 23 (33) Grosstown Road over Manatawny Creek, 24 West Pottsgrove Township, Bridge 25 Replacement 5,376,000 26 (Base Project Allocation - $806,000) 27 (Land Allocation - $70,000) 28 (Design and Contingencies - $4,500,000) 29 (34) SR 3003, Stenton Avenue over 30 Wissahickon Creek, Whitemarsh Township, 20080S1503B2474 - 287 -
1 Bridge Replacement 4,000,000 2 (Base Project Allocation - $575,000) 3 (Land Allocation - $50,000) 4 (Design and Contingencies - $3,375,000) 5 (35) SR 1002 over Towamencin Creek, 6 Towamencin Township, Bridge 7 Replacement 5,270,000 8 (Base Project Allocation - $4,100,000) 9 (Land Allocation - $500,000) 10 (Design and Contingencies - $670,000) 11 (36) SUMNEYTOWN PIKE OVER UNAMI CREEK, <-- 12 MARLBOROUGH TOWNSHIP, BRIDGE 13 REPLACEMENT 3,634,000 14 (BASE PROJECT ALLOCATION - $2,949,000) 15 (LAND ALLOCATION - $275,000) 16 (DESIGN AND CONTINGENCIES - $410,000) 17 (37) SUMNEYTOWN PIKE OVER EAST BRANCH OF 18 PERKIOMEN CREEK, UPPER SALFORD 19 TOWNSHIP, BRIDGE REPLACEMENT 3,634,000 20 (BASE PROJECT ALLOCATION - $2,949,000) 21 (LAND ALLOCATION - $275,000) 22 (DESIGN AND CONTINGENCIES - $410,000) 23 Section 51. Montour County. 24 (a) Local Bridges (Reserved) 25 (b) State Bridges 26 (1) SR 0044 over Branch of Chillisquaque 27 Creek, Anthony Township, Bridge 28 Replacement 120,000 29 (Base Project Allocation - $120,000) 30 (2) SR 1006 over White Hall Creek, Anthony 20080S1503B2474 - 288 -
1 Township, Bridge Replacement 150,000 2 (Base Project Allocation - $120,000) 3 (Design and Contingencies - $30,000) 4 (3) SR 2006 over Tributary of Susquehanna 5 River, Cooper Township, Bridge 6 Replacement 220,000 7 (Base Project Allocation - $150,000) 8 (Land Allocation - $20,000) 9 (Design and Contingencies - $50,000) 10 (4) SR 1007 over Mud Creek, Derry 11 Township, Bridge Replacement 190,000 12 (Base Project Allocation - $120,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $50,000) 15 (5) SR 0044 over Chillisquaque Creek, 16 Limestone Township, Bridge Replacement 30,000 17 (Design and Contingencies - $30,000) 18 (6) SR 2008 over Sechler Run, Mahoning 19 Township, Bridge Replacement 260,000 20 (Base Project Allocation - $120,000) 21 (Land Allocation - $110,000) 22 (Design and Contingencies - $30,000) 23 (7) SR 2008 over Tributary of Escher Run, 24 Mahoning Township, Bridge Replacement 150,000 25 (Base Project Allocation - $100,000) 26 (Design and Contingencies - $50,000) 27 Section 52. Northampton County. 28 (a) Local Bridges 29 (1) City of Easton, Bushkill Street over 30 Bushkill Creek, Bridge Rehabilitation 1,000,000 20080S1503B2474 - 289 -
1 (Base Project Allocation - $1,000,000) 2 (2) City of Easton, Glendon Hill Road over 3 Lehigh River, Bridge Rehabilitation 1,000,000 4 (Base Project Allocation - $1,000,000) 5 (3) WASHINGTON TOWNSHIP, COUNTY BRIDGE <-- 6 NO.189 OVER WALTZ CREEK, BRIDGE 7 REPLACEMENT 850,000 8 (BASE PROJECT ALLOCATION - $433,000) 9 (LAND ALLOCATION - $167,000) 10 (DESIGN AND CONTINGENCIES - $250,000) 11 (4) BUSHKILL TOWNSHIP, T-638 OVER SOBERS 12 RUN, BRIDGE CONSTRUCTION 536,000 13 (BASE PROJECT ALLOCATION - $500,000) 14 (DESIGN AND CONTINGENCIES - $36,000) 15 (b) State Bridges 16 (1) PA 611 over Tributary of Oughoughton 17 Creek, Lower Mt. Bethel Township, 18 Bridge Replacement 800,000 19 (Base Project Allocation - $400,000) 20 (Land Allocation - $50,000) 21 (Design and Contingencies - $350,000) 22 (2) SR 0946 over Hokendauqua Creek, Moore 23 Township, Bridge Replacement 975,000 24 (Base Project Allocation - $475,000) 25 (Land Allocation - $50,000) 26 (Design and Contingencies - $450,000) 27 (3) SR 2017, Bushkill Street over Bushkill 28 Creek, Stockertown Borough, Bridge 29 Removal 615,000 30 (Base Project Allocation - $505,000) 20080S1503B2474 - 290 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $100,000) 3 (4) PA 191 over SR 0033, Stockertown 4 Borough, Bridge Rehabilitation 695,000 5 (Base Project Allocation - $135,000) 6 (Land Allocation - $20,000) 7 (Design and Contingencies - $540,000) 8 (5) SR 1033, North Main over Martins 9 Creek, Washington Township, Bridge 10 Replacement 300,000 11 (Base Project Allocation - $80,000) 12 (Land Allocation - $50,000) 13 (Design and Contingencies - $170,000) 14 (6) SR 1002 over Bushkill Creek, Tatamy 15 Borough, Bridge Replacement 2,000,000 16 (Base Project Allocation - $2,000,000) 17 (7) PA 611, LR 166 OVER SLATEFORD CREEK, <-- 18 UPPER MT. BETHEL TOWNSHIP, BRIDGE 19 REHABILITATION 330,000 20 (BASE PROJECT ALLOCATION - $231,000) 21 (DESIGN AND CONTINGENCIES - $99,000) 22 (8) SR 1004, LR 48025 OVER TRIBUTARY OF 23 DELAWARE RIVER, LOWER MT. BETHEL 24 TOWNSHIP, BRIDGE REHABILITATION 59,000 25 (BASE PROJECT ALLOCATION - $41,000) 26 (DESIGN AND CONTINGENCIES - $18,000) 27 (9) SR 1004, LR 48025 OVER TRIBUTARY OF 28 DELAWARE RIVER, LOWER MT. BETHEL 29 TOWNSHIP, BRIDGE REHABILITATION 65,000 30 (BASE PROJECT ALLOCATION - $45,000) 20080S1503B2474 - 291 -
1 (DESIGN AND CONTINGENCIES - $20,000) 2 (10) SR 1012, LR 48087 OVER BUSHKILL 3 CREEK, BUSHKILL TOWNSHIP, BRIDGE 4 REHABILITATION 630,000 5 (BASE PROJECT ALLOCATION - $441,000) 6 (DESIGN AND CONTINGENCIES - $189,000) 7 (11) SR 1015, LR 165, BRIDGE NO.28674 OVER 8 MARTINS CREEK, WASHINGTON TOWNSHIP, 9 BRIDGE REHABILITATION 380,000 10 (BASE PROJECT ALLOCATION - $266,000) 11 (DESIGN AND CONTINGENCIES - $114,000) 12 (12) SR 1015, LR 165, BRIDGE NO.28678 OVER 13 MARTINS CREEK, BANGOR BOROUGH, BRIDGE 14 REHABILITATION 277,000 15 (BASE PROJECT ALLOCATION - $194,000) 16 (DESIGN AND CONTINGENCIES - $83,000) 17 (13) SR 1032, LR 166 OVER JACOBY CREEK AND 18 MILL RACE, PORTLAND BOROUGH, BRIDGE 19 REHABILITATION 250,000 20 (BASE PROJECT ALLOCATION - $175,000) 21 (DESIGN AND CONTINGENCIES - $75,000) 22 (14) SR 1033, LR 48075 OVER TRIBUTARY OF 23 MARTINS CREEK, WASHINGTON TOWNSHIP, 24 BRIDGE REHABILITATION 78,000 25 (BASE PROJECT ALLOCATION - $54,000) 26 (DESIGN AND CONTINGENCIES - $24,000) 27 (15) SR 1039, LR 517, BRIDGE NO.28701 OVER 28 TRIBUTARY OF DELAWARE RIVER, UPPER MT. 29 BETHEL TOWNSHIP, BRIDGE REHABILITATION 108,000 30 (BASE PROJECT ALLOCATION - $75,000) 20080S1503B2474 - 292 -
1 (DESIGN AND CONTINGENCIES - $33,000) 2 (16) SR 1039, LR 517, BRIDGE NO.28702 OVER 3 TRIBUTARY OF DELAWARE RIVER, UPPER MT. 4 BETHEL TOWNSHIP, BRIDGE REHABILITATION 66,000 5 (BASE PROJECT ALLOCATION - $46,000) 6 (DESIGN AND CONTINGENCIES - $20,000) 7 (17) SR 0191, APPL.1019 OVER SR 0033, LR 8 1098, STOCKERTOWN BOROUGH, BRIDGE 9 REHABILITATION 3,700,000 10 (BASE PROJECT ALLOCATION - $2,700,000) 11 (DESIGN AND CONTINGENCIES - $1,000,000) 12 (18) SR 0248, LR 471 OVER HOKENDAUQUA 13 CREEK, MOORE TOWNSHIP, BRIDGE 14 REHABILITATION 302,000 15 (BASE PROJECT ALLOCATION - $211,000) 16 (DESIGN AND CONTINGENCIES - $91,000) 17 (19) SR 3020, LR 48063 OVER TRIBUTARY OF 18 MONACACY CREEK, LOWER NAZARETH 19 TOWNSHIP, BRIDGE REHABILITATION 246,000 20 (BASE PROJECT ALLOCATION - $172,000) 21 (DESIGN AND CONTINGENCIES - $74,000) 22 (20) SR 3020, LR 48063 OVER EAST BRANCH OF 23 MONACACY CREEK, UPPER NAZARETH 24 TOWNSHIP, BRIDGE REHABILITATION 214,000 25 (BASE PROJECT ALLOCATION - $150,000) 26 (DESIGN AND CONTINGENCIES - $64,000) 27 (21) SR 4007, LR 48055, BRIDGE NO.28783 28 OVER TRIBUTARY OF HOKENDAUQUA CREEK, 29 MOORE TOWNSHIP, BRIDGE REHABILITATION 88,000 30 (BASE PROJECT ALLOCATION - $61,000) 20080S1503B2474 - 293 -
1 (DESIGN AND CONTINGENCIES - $27,000) 2 (22) SR 4007, LR 48055, BRIDGE NO.28784 3 OVER TRIBUTARY OF HOKENDAUQUA CREEK, 4 MOORE TOWNSHIP, BRIDGE REHABILITATION 92,000 5 (BASE PROJECT ALLOCATION - $64,000) 6 (DESIGN AND CONTINGENCIES - $28,000) 7 (23) SR 4014, LR 48043 OVER BRANCH OF 8 HOKENDAUQUA CREEK, MOORE TOWNSHIP, 9 BRIDGE REHABILITATION 63,000 10 (BASE PROJECT ALLOCATION - $44,000) 11 (DESIGN AND CONTINGENCIES - $19,000) 12 (24) SR 4019, LR 48044 OVER TRIBUTARY OF 13 BUSHKILL CREEK, BUSHKILL TOWNSHIP, 14 BRIDGE REHABILITATION 92,000 15 (BASE PROJECT ALLOCATION - $64,000) 16 (DESIGN AND CONTINGENCIES - $28,000) 17 (25) SR 4019, LR 48044 OVER HORN CREEK, 18 BUSHKILL TOWNSHIP, BRIDGE 19 REHABILITATION 73,000 20 (BASE PROJECT ALLOCATION - $51,000) 21 (DESIGN AND CONTINGENCIES - $22,000) 22 (26) SR 0512, LR 166 OVER BRUSH MEADOW 23 CREEK, BANGOR BOROUGH, BRIDGE 24 REHABILITATION 94,000 25 (BASE PROJECT ALLOCATION - $66,000) 26 (DESIGN AND CONTINGENCIES - $28,000) 27 (27) SR 0512, LR 48046 OVER TRIBUTARY OF 28 MONOCACY CREEK, EAST ALLEN TOWNSHIP, 29 BRIDGE REHABILITATION 246,000 30 (BASE PROJECT ALLOCATION - $172,000) 20080S1503B2474 - 294 -
1 (DESIGN AND CONTINGENCIES - $74,000)
2 (28) SR 0512, LR 752 OVER BUSHKILL CREEK,
3 BUSHKILL TOWNSHIP, BRIDGE
4 REHABILITATION 420,000
5 (BASE PROJECT ALLOCATION - $294,000)
6 (DESIGN AND CONTINGENCIES - $126,000)
7 (29) SR 0946, LR 752 OVER HOKENDAUQUA
8 CREEK, MOORE TOWNSHIP, BRIDGE
9 REPLACEMENT 550,000
10 (BASE PROJECT ALLOCATION - $425,000)
11 (DESIGN AND CONTINGENCIES - $125,000)
12 (30) SR 1033, LR 48075SP. OVER MARTINS
13 CREEK, WASHINGTON TOWNSHIP, BRIDGE
14 REPLACEMENT 1,025,000
15 (BASE PROJECT ALLOCATION - $525,000)
16 (DESIGN AND CONTINGENCIES - $500,000)
17 (31) SR 0191, LR 297 OVER MONOCACY CREEK,
18 LOWER NAZARETH TOWNSHIP, DECK
19 REPLACEMENT 850,000
20 (BASE PROJECT ALLOCATION - $700,000)
21 (DESIGN AND CONTINGENCIES - $150,000)
22 Section 53. Northumberland County.
23 (a) Local Bridges (Reserved) <--
24 (A) LOCAL BRIDGES <--
25 (1) LEWIS TOWNSHIP, T-631 OVER TRIBUTARY
26 OF BEAVER RUN, BRIDGE REPLACEMENT 698,000
27 (BASE PROJECT ALLOCATION - $468,000)
28 (LAND ALLOCATION - $36,000)
29 (DESIGN AND CONTINGENCIES - $194,000)
30 (b) State Bridges
20080S1503B2474 - 295 -
1 (1) SR 0061 over Susquehanna River, City 2 of Sunbury, Bridge Rehabilitation 94,000 3 (Base Project Allocation - $80,000) 4 (Land Allocation - $4,000) 5 (Design and Contingencies - $10,000) 6 (2) SR 1016 over Tributary of Muddy Run, 7 Delaware Township, Bridge Replacement 360,000 8 (Base Project Allocation - $260,000) 9 (Land Allocation - $20,000) 10 (Design and Contingencies - $80,000) 11 (3) SR 0405 over Tributary of Delaware 12 Run, Delaware Township, Bridge 13 Rehabilitation 400,000 14 (Base Project Allocation - $300,000) 15 (Land Allocation - $40,000) 16 (Design and Contingencies - $60,000) 17 (4) SR 3018 over Tributary of Mahantango 18 Creek, Jordan Township, Bridge 19 Replacement 145,000 20 (Base Project Allocation - $100,000) 21 (Land Allocation - $15,000) 22 (Design and Contingencies - $30,000) 23 (5) SR 3019 over Tributary of Mahantango 24 Creek, Jordan Township, Bridge 25 Replacement 190,000 26 (Base Project Allocation - $120,000) 27 (Land Allocation - $20,000) 28 (Design and Contingencies - $50,000) 29 (6) SR 1008 over Tributary of Warrior Run 30 Creek, Lewis Township, Bridge 20080S1503B2474 - 296 -
1 Replacement 240,000 2 (Base Project Allocation - $120,000) 3 (Land Allocation - $70,000) 4 (Design and Contingencies - $50,000) 5 (7) SR 1011 over Tributary of Warrior Run, 6 Lewis Township, Bridge Replacement 140,000 7 (Base Project Allocation - $100,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $30,000) 10 (8) SR 1015 over Muddy Run, Lewis 11 Township, Bridge Replacement 150,000 12 (Base Project Allocation - $120,000) 13 (Design and Contingencies - $30,000) 14 (9) SR 0147 over Tributary of Susquehanna 15 River, Point Township, Bridge 16 Rehabilitation 428,000 17 (Base Project Allocation - $400,000) 18 (Land Allocation - $8,000) 19 (Design and Contingencies - $20,000) 20 (10) SR 1024 over Tributary of Susquehanna 21 River, Point Township, Bridge 22 Replacement 100,000 23 (Base Project Allocation - $100,000) 24 (11) SR 0487 over Shamokin Creek, Ralpho 25 Township, Bridge Rehabilitation 520,000 26 (Base Project Allocation - $500,000) 27 (Design and Contingencies - $20,000) 28 (12) SR 2013 over Benny's Run, Shamokin 29 Township, Bridge Replacement 165,000 30 (Base Project Allocation - $120,000) 20080S1503B2474 - 297 -
1 (Land Allocation - $15,000) 2 (Design and Contingencies - $30,000) 3 (13) SR 1029 OVER LIMESTONE RUN, TURBOT <-- 4 TOWNSHIP, BRIDGE REHABILITATION 478,000 5 (BASE PROJECT ALLOCATION - $450,000) 6 (DESIGN AND CONTINGENCIES - $28,000) 7 (14) SR 0125 OVER MAHANOY CREEK, EAST 8 CAMERON TOWNSHIP, BRIDGE 9 REHABILITATION 194,000 10 (BASE PROJECT ALLOCATION - $186,000) 11 (DESIGN AND CONTINGENCIES - $8,000) 12 (15) SR 0044 OVER WARRIOR RUN CREEK, 13 DELAWARE TOWNSHIP, BRIDGE 14 REHABILITATION 194,000 15 (BASE PROJECT ALLOCATION - $186,000) 16 (DESIGN AND CONTINGENCIES - $8,000) 17 (16) SR 1011, TRIBUTARY OF WARRIOR RUN, 18 LEWIS TOWNSHIP, BRIDGE REPLACEMENT 140,000 19 (BASE PROJECT ALLOCATION - $100,000) 20 (LAND ALLOCATION - $10,000) 21 (DESIGN AND CONTINGENCIES - $30,000) 22 (17) SR 3004 OVER ZERBE RUN, LITTLE 23 MAHANOY TOWNSHIP, BRIDGE 24 REHABILITATION 350,000 25 (BASE PROJECT ALLOCATION - $325,000) 26 (DESIGN AND CONTINGENCIES - $25,000) 27 Section 54. Perry County. 28 (a) Local Bridges (Reserved) 29 (b) State Bridges 30 (1) SR 4010 over Lutman Run, Centre 20080S1503B2474 - 298 -
1 Township, Bridge Replacement 100,000 2 (Base Project Allocation - $100,000) 3 (2) US 22/322 Bridge No.29473 over 4 Cocolamus Creek, Greenwood Township, 5 Bridge Rehabilitation 2,645,000 6 (Base Project Allocation - $1,245,000) 7 (Design and Contingencies - $1,400,000) 8 (3) US 22/322 Bridge No.29475 over 9 Cocolamus Creek, Greenwood Township, 10 Bridge Rehabilitation 2,645,000 11 (Base Project Allocation - $1,245,000) 12 (Design and Contingencies - $1,400,000) 13 (4) PA 0849 over Buffalo Creek, Juniata 14 Township, Bridge Rehabilitation 1,200,000 15 (Base Project Allocation - $1,200,000) 16 (5) PA 17 over Buffalo Creek, Saville 17 Township, Bridge Rehabilitation 2,540,000 18 (Base Project Allocation - $1,140,000) 19 (Design and Contingencies - $1,400,000) 20 (6) US 22/322 East Bound over SR 1028, 21 Watts Township, Bridge Rehabilitation 1,500,000 22 (Base Project Allocation - $1,500,000) 23 Section 55. Philadelphia. 24 (a) Local Bridges 25 (1) City of Philadelphia, Bells Mill Road 26 over Wissanickon Creek, Bridge 27 Rehabilitation 330,000 28 (Base Project Allocation - $300,000) 29 (Design and Contingencies - $30,000) 30 (b) State Bridges 20080S1503B2474 - 299 -
1 (1) 21st Street over Vine Street 2 Expressway, City of Philadelphia, 3 Bridge Replacement 4,373,000 4 (Base Project Allocation - $460,000) 5 (Land Allocation - $143,000) 6 (Design and Contingencies - $3,770,000) 7 (2) 22nd Street over Vine Street 8 Expressway, City of Philadelphia, 9 Bridge Replacement 4,373,000 10 (Base Project Allocation - $460,000) 11 (Land Allocation - $143,000) 12 (Design and Contingencies - $3,770,000) 13 (3) SR 3003, 34th Street over CSX Railroad 14 Tunnels, City of Philadelphia, Bridge 15 Replacement 8,900,000 16 (Base Project Allocation - $1,497,000) 17 (Land Allocation - $200,000) 18 (Design and Contingencies - $7,203,000) 19 (4) SR 3021, 49th Street over AMTRAK, City 20 of Philadelphia, Bridge Replacement 5,020,000 21 (Base Project Allocation - $920,000) 22 (Land Allocation - $100,000) 23 (Design and Contingencies - $4,000,000) 24 (5) SR 3023, 65th Street over Cobbs Creek, 25 City of Philadelphia, Bridge 26 Rehabilitation 63,000 27 (Base Project Allocation - $11,000) 28 (Land Allocation - $1,000) 29 (Design and Contingencies - $51,000) 30 (6) SR 3007, Ben Franklin Parkway over 20080S1503B2474 - 300 -
1 Vine Street Expressway, City of 2 Philadelphia, Bridge Replacement 4,373,000 3 (Base Project Allocation - $460,000) 4 (Land Allocation - $143,000) 5 (Design and Contingencies - $3,770,000) 6 (7) SR 0611, Broad Street over Roosevelt 7 Boulevard, City of Philadelphia, Bridge 8 Rehabilitation 63,000 9 (Base Project Allocation - $11,000) 10 (Land Allocation - $1,000) 11 (Design and Contingencies - $51,000) 12 (8) SR 2010, Cecil Moo Avenue over AMTRAK, 13 City of Philadelphia, Bridge 14 Replacement 27,713,000 15 (Base Project Allocation - $2,073,000) 16 (Land Allocation - $700,000) 17 (Design and Contingencies - 18 $24,940,000) 19 (9) SR 0003, Chestnut Street over CSX 20 Railroad, City of Philadelphia, Bridge 21 Rehabilitation 1,389,000 22 (Base Project Allocation - $96,000) 23 (Land Allocation - $31,000) 24 (Design and Contingencies - $1,262,000) 25 (10) SR 1004, Erie Avenue over CONRAIL 26 Railroad, Tracks Removed, City of 27 Philadelphia, Bridge Rehabilitation 63,000 28 (Base Project Allocation - $11,000) 29 (Land Allocation - $1,000) 30 (Design and Contingencies - $51,000) 20080S1503B2474 - 301 -
1 (11) SR 2007, Frankford Avenue over 2 Frankford Creek, City of Philadelphia, 3 Bridge Rehabilitation 1,389,000 4 (Base Project Allocation - $96,000) 5 (Land Allocation - $31,000) 6 (Design and Contingencies - $1,262,000) 7 (12) SR 4001, Henry Avenue over US 1 8 Roosevelt Boulevard, City of 9 Philadelphia, Bridge Rehabilitation 63,000 10 (Base Project Allocation - $11,000) 11 (Land Allocation - $1,000) 12 (Design and Contingencies - $51,000) 13 (13) I-95 over Cambria Street and Ann 14 Street, City of Philadelphia, Bridge 15 Rehabilitation 18,000,000 16 (Base Project Allocation - $18,000,000) 17 (14) Market Street over I-95 Ramps, 18 Columbus Boulevard, City of 19 Philadelphia, Bridge Rehabilitation 63,000 20 (Base Project Allocation - $11,000) 21 (Land Allocation - $1,000) 22 (Design and Contingencies - $51,000) 23 (15) SR 3010, Market Street over 24 Schuylkill River, City of Philadelphia, 25 Bridge Rehabilitation 17,833,000 26 (Base Project Allocation - $13,333,000) 27 (Land Allocation - $2,000,000) 28 (Design and Contingencies - $2,500,000) 29 (16) SR 3010, Market Street over 30 Schuylkill Expressway, AMTRAK, City of 20080S1503B2474 - 302 -
1 Philadelphia, Bridge Rehabilitation 17,833,000 2 (Base Project Allocation - $13,333,000) 3 (Land Allocation - $2,000,000) 4 (Design and Contingencies - $2,500,000) 5 (17) Pedestrian Bridge, 18th and 19th 6 Court House over Vine Street 7 Expressway, City of Philadelphia, 8 Bridge Replacement 4,373,000 9 (Base Project Allocation - $460,000) 10 (Land Allocation - $143,000) 11 (Design and Contingencies - $3,770,000) 12 (18) Pedestrian Bridge 18th and 19th 13 Library over Vine Street Expressway, 14 City of Philadelphia, Bridge 15 Replacement 4,373,000 16 (Base Project Allocation - $460,000) 17 (Land Allocation - $143,000) 18 (Design and Contingencies - $3,770,000) 19 (19) SR 1016, Pennypack Circle Bridge 20 No.38356 over Roosevelt Boulevard, City 21 of Philadelphia, Bridge Replacement 12,500,000 22 (Base Project Allocation - $1,892,000) 23 (Land Allocation - $274,000) 24 (Design and Contingencies - 25 $10,334,000) 26 (20) SR 1016, Pennypack Circle Bridge 27 No.38357 over Roosevelt Boulevard, City 28 of Philadelphia, Bridge Replacement 12,500,000 29 (Base Project Allocation - $1,892,000) 30 (Land Allocation - $274,000) 20080S1503B2474 - 303 -
1 (Design and Contingencies - 2 $10,334,000) 3 (21) SR 0076, Ramp E/Ramp H over Tributary 4 of Schuylkill River, City of 5 Philadelphia, Bridge Rehabilitation 2,000,000 6 (Base Project Allocation - $2,000,000) 7 (22) SR 0001, Roosevelt Boulevard over 8 Roberts Avenue, SEPTA, City of 9 Philadelphia, Bridge Replacement 35,000,000 10 (Base Project Allocation - $3,600,000) 11 (Land Allocation - $200,000) 12 (Design and Contingencies - 13 $31,200,000) 14 (23) SR 0076, Schuylkill Expressway over 15 Ramp C from Vine Street, City of 16 Philadelphia, Bridge Rehabilitation 2,000,000 17 (Base Project Allocation - $2,000,000) 18 (24) SR 0076, Schuylkill Expressway over 19 Schuylkill River Bank, City of 20 Philadelphia, Bridge Rehabilitation 2,000,000 21 (Base Project Allocation - $2,000,000) 22 (25) SR 0076, Schuylkill Expressway over 23 Montgomery Drive, City of Philadelphia, 24 Bridge Rehabilitation 2,000,000 25 (Base Project Allocation - $2,000,000) 26 (26) SR 0076, Schuylkill Expressway over 27 Black Road, City of Philadelphia, 28 Bridge Rehabilitation 2,000,000 29 (Base Project Allocation - $2,000,000) 30 (27) SR 0076, Schuylkill Expressway over 20080S1503B2474 - 304 -
1 Neill Drive, City of Philadelphia, 2 Bridge Rehabilitation 2,000,000 3 (Base Project Allocation - $2,000,000) 4 (28) SR 0076, Schuylkill Expressway over 5 LR 67058, Ramp B, City of Philadelphia, 6 Bridge Rehabilitation 2,000,000 7 (Base Project Allocation - $2,000,000) 8 (29) SR 0076, Schuylkill Expressway Bridge 9 No.38479 over Pile Supported Slab, City 10 of Philadelphia, Bridge Rehabilitation 2,000,000 11 (Base Project Allocation - $2,000,000) 12 (30) SR 0076, Schuylkill Expressway Bridge 13 No.38484 over Pile Supported Slab, City 14 of Philadelphia, Bridge Rehabilitation 2,000,000 15 (Base Project Allocation - $2,000,000) 16 (31) SR 3003, University Avenue over CSX 17 Railroad, City of Philadelphia, Bridge 18 Replacement 7,070,000 19 (Base Project Allocation - $920,000) 20 (Land Allocation - $150,000) 21 (Design and Contingencies - $6,000,000) 22 (32) SR 0676, Vine Street over Schuylkill 23 River, Ramp D, City of Philadelphia, 24 Bridge Replacement 4,373,000 25 (Base Project Allocation - $460,000) 26 (Land Allocation - $143,000) 27 (Design and Contingencies - $3,770,000) 28 (33) SR 1011, Willits Road over Wooden 29 Bridge Run, City of Philadelphia, 30 Bridge Rehabilitation 3,150,000 20080S1503B2474 - 305 -
1 (Base Project Allocation - $2,000,000) 2 (Land Allocation - $300,000) 3 (Design and Contingencies - $850,000) 4 (34) SR 3010, Market Street over CSX 5 Railroad, City of Philadelphia, Bridge 6 Rehabilitation 17,833,000 7 (Base Project Allocation - $13,333,000) 8 (Land Allocation - $2,000,000) 9 (Design and Contingencies - $2,500,000) 10 (35) GRAYS FERRY AVENUE OVER SCHUYLKILL <-- 11 RIVER, AMTRAK, CITY OF PHILADELPHIA, 12 DECK REHABILITATION 2,500,000 13 (LAND ALLOCATION - $900,000) 14 (DESIGN AND CONTINGENCIES - $1,600,000) 15 Section 56. Pike County. 16 (a) Local Bridges 17 (1) Greene Township, T-372, Sawmill Road 18 over Bridge Creek, Bridge 19 Rehabilitation 32,000 20 (Base Project Allocation - $32,000) 21 (2) Greene Township, T-374, Mountain View 22 Road over Sugar Hill Creek, Bridge 23 Rehabilitation 15,000 24 (Base Project Allocation - $15,000) 25 (3) Greene Township, T-378, Creek Road 26 over East Branch of Wallenpaupack 27 Creek, Bridge Rehabilitation 25,000 28 (Base Project Allocation - $25,000) 29 (4) Greene Township, T-390 over Mozette 30 Creek, Bridge Rehabilitation 21,000 20080S1503B2474 - 306 -
1 (Base Project Allocation - $21,000) 2 (5) Greene Township, T-343, Lake Russell 3 Road over Freeling Run, Bridge 4 Rehabilitation 15,000 5 (Base Project Allocation - $15,000) 6 (6) Greene Township, T-380, Creek Road 7 over East Branch of Wallenpaupack 8 Creek, Bridge Rehabilitation 45,000 9 (Base Project Allocation - $45,000) 10 (7) Shohola Township, SR 1006, Knealing 11 Road over Shohola Creek, Bridge 12 Rehabilitation 1,000,000 13 (Base Project Allocation - $1,000,000) 14 (8) Westfall Township, Bluestone 15 Boulevard, Cummins Hill Road over Bush 16 Kill, Bridge Replacement 275,000 17 (Base Project Allocation - $200,000) 18 (Design and Contingencies - $75,000) 19 (9) Lackawaxen Township, T-438 over Water 20 Span, Bridge Replacement 630,000 21 (Base Project Allocation - $630,000) 22 (10) Lehman Township, T-301 over Little 23 Bushkill, Bridge Replacement 630,000 24 (Base Project Allocation - $630,000) 25 (11) Porter Township, T-317 over Big 26 Bushkill, Bridge Replacement 630,000 27 (Base Project Allocation - $630,000) 28 (12) Porter Township, T-317 over Spruce 29 Run, Bridge Replacement 630,000 30 (Base Project Allocation - $630,000) 20080S1503B2474 - 307 -
1 (13) Lehman Township, T-322 over Lake
2 Maskenhoza, Bridge Replacement 630,000
3 (Base Project Allocation - $630,000)
4 (b) State Bridges
5 (1) SR 0006 over Sawkill Creek, Milford
6 Township, Bridge Rehabilitation 281,000
7 (Base Project Allocation - $194,000)
8 (Land Allocation - $19,000)
9 (Design and Contingencies - $68,000)
10 Section 57. Potter County.
11 (a) Local Bridges (Reserved) <--
12 (A) LOCAL BRIDGES <--
13 (1) HEBRON TOWNSHIP, T-300 OVER OSWAYO
14 CREEK, TOAD HOLLOW ROAD, BRIDGE
15 REPLACEMENT 300,000
16 (BASE PROJECT ALLOCATION - $200,000)
17 (LAND ALLOCATION - $50,000)
18 (DESIGN AND CONTINGENCIES - $50,000)
19 (2) ULYSSES TOWNSHIP, T-439 OVER PINE
20 CREEK, BRIDGE REPLACEMENT 300,000
21 (BASE PROJECT ALLOCATION - $200,000)
22 (LAND ALLOCATION - $50,000)
23 (DESIGN AND CONTINGENCIES - $50,000)
24 (b) State Bridges
25 (1) SR 2001 over Kettle Creek, Abbott
26 Township, Bridge Replacement 354,000
27 (Base Project Allocation - $240,000)
28 (Land Allocation - $30,000)
29 (Design and Contingencies - $84,000)
30 (2) SR 0049 over Marsh Creek, Bingham
20080S1503B2474 - 308 -
1 Township, Bridge Replacement 275,000 2 (Base Project Allocation - $200,000) 3 (Design and Contingencies - $75,000) 4 (3) SR 0872 over Mill Creek, Coudersport 5 Borough, Bridge Replacement 1,400,000 6 (Base Project Allocation - $1,000,000) 7 (Land Allocation - $200,000) 8 (Design and Contingencies - $200,000) 9 (4) SR 0244 over Cryder Creek, Genesee 10 Township, Bridge Replacement 1,400,000 11 (Base Project Allocation - $1,000,000) 12 (Land Allocation - $200,000) 13 (Design and Contingencies - $200,000) 14 (5) SR 0049 over Dodge Hollow Run, 15 Harrison Township, Bridge Replacement 852,000 16 (Base Project Allocation - $140,000) 17 (Land Allocation - $100,000) 18 (Design and Contingencies - $612,000) 19 (6) SR 0049, Bridge No.30189 over 20 Cowanesque Creek, Harrison Township, 21 Bridge Replacement 1,575,000 22 (Base Project Allocation - $850,000) 23 (Land Allocation - $125,000) 24 (Design and Contingencies - $600,000) 25 (7) SR 0049, Bridge No.30196 over 26 Cowanesque Creek, Harrison Township, 27 Bridge Replacement 872,000 28 (Base Project Allocation - $160,000) 29 (Land Allocation - $100,000) 30 (Design and Contingencies - $612,000) 20080S1503B2474 - 309 -
1 (8) SR 1021 over Cowanesque River, 2 Harrison Township, Bridge Replacement 550,000 3 (Base Project Allocation - $400,000) 4 (Land Allocation - $30,000) 5 (Design and Contingencies - $120,000) 6 (9) SR 0044 over South Branch Oswayo 7 Creek, Hebron Township, Bridge 8 Replacement 1,400,000 9 (Base Project Allocation - $1,000,000) 10 (Land Allocation - $200,000) 11 (Design and Contingencies - $200,000) 12 (10) SR 4025 over Brizzle Hollow Run, 13 Oswayo Township, Bridge Replacement 324,000 14 (Base Project Allocation - $220,000) 15 (Land Allocation - $30,000) 16 (Design and Contingencies - $74,000) 17 (11) SR 1005 over Little Phoenix Run, Pike 18 Township, Bridge Replacement 300,000 19 (Base Project Allocation - $200,000) 20 (Land Allocation - $50,000) 21 (Design and Contingencies - $50,000) 22 (12) SR 3002 over Cowley Run, Portage 23 Township, Bridge Replacement 494,000 24 (Base Project Allocation - $344,000) 25 (Land Allocation - $30,000) 26 (Design and Contingencies - $120,000) 27 (13) SR 3003 over Eleven Mile Run, 28 Sylvania Township, Bridge Replacement 215,000 29 (Base Project Allocation - $140,000) 30 (Design and Contingencies - $75,000) 20080S1503B2474 - 310 -
1 (14) SR 0449 over Genesee River, Ulysses 2 Township, Bridge Replacement 1,050,000 3 (Base Project Allocation - $650,000) 4 (Land Allocation - $150,000) 5 (Design and Contingencies - $250,000) 6 (15) SR 0449 over Cushing Creek, Ulysses 7 Township, Bridge Replacement 1,400,000 8 (Base Project Allocation - $1,000,000) 9 (Land Allocation - $200,000) 10 (Design and Contingencies - $200,000) 11 (16) SR 1001 over Rogers Run, Ulysses 12 Township, Bridge Replacement 215,000 13 (Base Project Allocation - $140,000) 14 (Design and Contingencies - $75,000) 15 (17) SR 3001 over Stone Lick Run, Wharton 16 Township, Bridge Replacement 1,400,000 17 (Base Project Allocation - $1,000,000) 18 (Land Allocation - $200,000) 19 (Design and Contingencies - $200,000) 20 (18) SR 0006 OVER LEHMAN RUN, EULALIA <-- 21 TOWNSHIP, BRIDGE REPLACEMENT 71,000 22 (BASE PROJECT ALLOCATION - $34,000) 23 (LAND ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $17,000) 25 (19) SR 0006 OVER TROUT BROOK, ROULETTE 26 TOWNSHIP, BRIDGE REPLACEMENT 169,000 27 (BASE PROJECT ALLOCATION - $99,000) 28 (LAND ALLOCATION - $20,000) 29 (DESIGN AND CONTINGENCIES - $50,000) 30 (20) SR 0044 OVER LITTLE KETTLE CREEK, 20080S1503B2474 - 311 -
1 ABBOTT TOWNSHIP, BRIDGE REPLACEMENT 133,000 2 (BASE PROJECT ALLOCATION - $75,000) 3 (LAND ALLOCATION - $20,000) 4 (DESIGN AND CONTINGENCIES - $38,000) 5 (21) SR 0044 OVER CLARA CREEK, CLARA 6 TOWNSHIP, BRIDGE REPLACEMENT 167,000 7 (BASE PROJECT ALLOCATION - $98,000) 8 (LAND ALLOCATION - $20,000) 9 (DESIGN AND CONTINGENCIES - $49,000) 10 (22) SR 0044 OVER STEER BROOK, HEBRON 11 TOWNSHIP, BRIDGE REPLACEMENT 68,000 12 (BASE PROJECT ALLOCATION - $32,000) 13 (LAND ALLOCATION - $20,000) 14 (DESIGN AND CONTINGENCIES - $16,000) 15 (23) SR 0044 OVER CAMPBELL RUN, HEBRON 16 TOWNSHIP, BRIDGE REPLACEMENT 97,000 17 (BASE PROJECT ALLOCATION - $51,000) 18 (LAND ALLOCATION - $20,000) 19 (DESIGN AND CONTINGENCIES - $26,000) 20 (24) SR 0044 OVER MILL CREEK, SWEDEN 21 TOWNSHIP, BRIDGE REPLACEMENT 178,000 22 (BASE PROJECT ALLOCATION - $105,000) 23 (LAND ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $53,000) 25 (25) SR 0049 OVER PEET BROOK, ALLEGANY 26 TOWNSHIP, BRIDGE REPLACEMENT 103,000 27 (BASE PROJECT ALLOCATION - $55,000) 28 (LAND ALLOCATION - $20,000) 29 (DESIGN AND CONTINGENCIES - $28,000) 30 (26) SR 0049 OVER TRIBUTARY OF ALLEGHENY 20080S1503B2474 - 312 -
1 RIVER, ALLEGANY TOWNSHIP, BRIDGE 2 REPLACEMENT 56,000 3 (BASE PROJECT ALLOCATION - $24,000) 4 (LAND ALLOCATION - $20,000) 5 (DESIGN AND CONTINGENCIES - $12,000) 6 (27) SR 0049 OVER STEER RUN, EULALIA 7 TOWNSHIP, BRIDGE REPLACEMENT 130,000 8 (BASE PROJECT ALLOCATION - $73,000) 9 (LAND ALLOCATION - $20,000) 10 (DESIGN AND CONTINGENCIES - $37,000) 11 (28) SR 0049 OVER COWANESQUE RIVER, 12 HARRISON TOWNSHIP, BRIDGE 13 REHABILITATION 332,000 14 (BASE PROJECT ALLOCATION - $208,000) 15 (LAND ALLOCATION - $20,000) 16 (DESIGN AND CONTINGENCIES - $104,000) 17 (29) SR 0049 OVER DODGE HOLLOW RUN, 18 HARRISON TOWNSHIP, BRIDGE REPLACEMENT 1,640,000 19 (BASE PROJECT ALLOCATION - $820,000) 20 (LAND ALLOCATION - $120,000) 21 (DESIGN AND CONTINGENCIES - $700,000) 22 (30) SR 0049 OVER BRANCH OF COWANESQUE 23 CREEK, HARRISON TOWNSHIP, BRIDGE 24 REPLACEMENT 98,000 25 (BASE PROJECT ALLOCATION - $52,000) 26 (LAND ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $26,000) 28 (31) SR 0049 OVER LENT HOLLOW RUN, HEBRON 29 TOWNSHIP, BRIDGE REPLACEMENT 98,000 30 (BASE PROJECT ALLOCATION - $52,000) 20080S1503B2474 - 313 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $26,000) 3 (32) SR 0049 OVER LUDINGTON RUN, ULYSSES 4 TOWNSHIP, BRIDGE REPLACEMENT 100,000 5 (BASE PROJECT ALLOCATION - $53,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $27,000) 8 (33) SR 0049, BRIDGE NO.30186 OVER MARSH 9 CREEK, BINGHAM TOWNSHIP, BRIDGE 10 REPLACEMENT 328,000 11 (BASE PROJECT ALLOCATION - $140,000) 12 (LAND ALLOCATION - $100,000) 13 (DESIGN AND CONTINGENCIES - $88,000) 14 (34) SR 0049, BRIDGE NO.30187 OVER MARSH 15 CREEK, BINGHAM TOWNSHIP, BRIDGE 16 REPLACEMENT 68,000 17 (BASE PROJECT ALLOCATION - $32,000) 18 (LAND ALLOCATION - $20,000) 19 (DESIGN AND CONTINGENCIES - $16,000) 20 (35) SR 0144 OVER KETTLE CREEK, STEWARDSON 21 TOWNSHIP, BRIDGE REPLACEMENT 527,000 22 (BASE PROJECT ALLOCATION - $338,000) 23 (LAND ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $169,000) 25 (36) SR 0144 OVER SOUTH SIDE CREEK, WEST 26 BRANCH TOWNSHIP, BRIDGE REPLACEMENT 49,000 27 (BASE PROJECT ALLOCATION - $19,000) 28 (LAND ALLOCATION - $20,000) 29 (DESIGN AND CONTINGENCIES - $10,000) 30 (37) SR 0244 OVER LEADVILLE RUN, GENESEE 20080S1503B2474 - 314 -
1 TOWNSHIP, BRIDGE REPLACEMENT 133,000 2 (BASE PROJECT ALLOCATION - $75,000) 3 (LAND ALLOCATION - $20,000) 4 (DESIGN AND CONTINGENCIES - $38,000) 5 (38) SR 0244 OVER CRYDER CREEK, GENESEE 6 TOWNSHIP, BRIDGE REPLACEMENT 428,000 7 (BASE PROJECT ALLOCATION - $272,000) 8 (LAND ALLOCATION - $20,000) 9 (DESIGN AND CONTINGENCIES - $136,000) 10 (39) SR 0244 OVER WEST OSWAYO CREEK, 11 OSWAYO BOROUGH, BRIDGE REPLACEMENT 122,000 12 (BASE PROJECT ALLOCATION - $68,000) 13 (LAND ALLOCATION - $20,000) 14 (DESIGN AND CONTINGENCIES - $34,000) 15 (40) SR 0449 OVER WEST BRANCH OF GENESEE 16 RIVER, GENESEE TOWNSHIP, BRIDGE 17 REPLACEMENT 476,000 18 (BASE PROJECT ALLOCATION - $304,000) 19 (LAND ALLOCATION - $20,000) 20 (DESIGN AND CONTINGENCIES - $152,000) 21 (41) SR 0449 OVER TRIBUTARY OF GENESEE 22 RIVER, GENESEE TOWNSHIP, BRIDGE 23 REPLACEMENT 68,000 24 (BASE PROJECT ALLOCATION - $32,000) 25 (LAND ALLOCATION - $20,000) 26 (DESIGN AND CONTINGENCIES - $16,000) 27 (42) SR 0449 OVER NINEMILE RUN, ULYSSES 28 TOWNSHIP, BRIDGE REPLACEMENT 122,000 29 (BASE PROJECT ALLOCATION - $68,000) 30 (LAND ALLOCATION - $20,000) 20080S1503B2474 - 315 -
1 (DESIGN AND CONTINGENCIES - $34,000) 2 (43) SR 0449 OVER PINE CREEK, ULYSSES 3 TOWNSHIP, BRIDGE REPLACEMENT 101,000 4 (BASE PROJECT ALLOCATION - $54,000) 5 (LAND ALLOCATION - $20,000) 6 (DESIGN AND CONTINGENCIES - $27,000) 7 (44) SR 0449 OVER GENESEE RIVER, ULYSSES 8 TOWNSHIP, BRIDGE REPLACEMENT 104,000 9 (BASE PROJECT ALLOCATION - $56,000) 10 (LAND ALLOCATION - $20,000) 11 (DESIGN AND CONTINGENCIES - $28,000) 12 (45) SR 0449, BRIDGE NO.30235 OVER CUSHING 13 CREEK, ULYSSES TOWNSHIP, BRIDGE 14 REPLACEMENT 121,000 15 (BASE PROJECT ALLOCATION - $67,000) 16 (LAND ALLOCATION - $20,000) 17 (DESIGN AND CONTINGENCIES - $34,000) 18 (46) SR 0449, BRIDGE NO.30236 OVER CUSHING 19 CREEK, ULYSSES TOWNSHIP, BRIDGE 20 REPLACEMENT 133,000 21 (BASE PROJECT ALLOCATION - $75,000) 22 (LAND ALLOCATION - $20,000) 23 (DESIGN AND CONTINGENCIES - $38,000) 24 (47) SR 0872 OVER BRANCH OF MILL CREEK, 25 EULALIA TOWNSHIP, BRIDGE REPLACEMENT 61,000 26 (BASE PROJECT ALLOCATION - $30,000) 27 (LAND ALLOCATION - $20,000) 28 (DESIGN AND CONTINGENCIES - $11,000) 29 (48) SR 0872 OVER WOODS RUN, HOMER 30 TOWNSHIP, BRIDGE REPLACEMENT 73,000 20080S1503B2474 - 316 -
1 (BASE PROJECT ALLOCATION - $35,000) 2 (LAND ALLOCATION - $20,000) 3 (DESIGN AND CONTINGENCIES - $18,000) 4 (49) SR 0872 OVER TRIBUTARY OF FREEMAN 5 RUN, HOMER TOWNSHIP, BRIDGE 6 REPLACEMENT 58,000 7 (BASE PROJECT ALLOCATION - $30,000) 8 (LAND ALLOCATION - $20,000) 9 (DESIGN AND CONTINGENCIES - $8,000) 10 (50) SR 0872 OVER EAST FORK OF 11 SINNEMAHONING CREEK, WHARTON TOWNSHIP, 12 BRIDGE REHABILITATION 643,000 13 (BASE PROJECT ALLOCATION - $415,000) 14 (LAND ALLOCATION - $20,000) 15 (DESIGN AND CONTINGENCIES - $208,000) 16 (51) SR 0872 OVER ELK LICK RUN, WHARTON 17 TOWNSHIP, BRIDGE REPLACEMENT 58,000 18 (BASE PROJECT ALLOCATION - $30,000) 19 (LAND ALLOCATION - $20,000) 20 (DESIGN AND CONTINGENCIES - $8,000) 21 (52) SR 0872 OVER BAILEY RUN, WHARTON 22 TOWNSHIP, BRIDGE REPLACEMENT 251,000 23 (BASE PROJECT ALLOCATION - $154,000) 24 (LAND ALLOCATION - $20,000) 25 (DESIGN AND CONTINGENCIES - $77,000) 26 (53) SR 0872 OVER FIRST FORK OF 27 SINNEMAHONING CREEK, WHARTON TOWNSHIP, 28 BRIDGE REPLACEMENT 1,271,000 29 (BASE PROJECT ALLOCATION - $834,000) 30 (LAND ALLOCATION - $20,000) 20080S1503B2474 - 317 -
1 (DESIGN AND CONTINGENCIES - $417,000) 2 (54) SR 1001 OVER BENTON RUN, ULYSSES 3 TOWNSHIP, BRIDGE REPLACEMENT 62,000 4 (BASE PROJECT ALLOCATION - $30,000) 5 (LAND ALLOCATION - $20,000) 6 (DESIGN AND CONTINGENCIES - $12,000) 7 (55) SR 1001 OVER CUSHING CREEK, ULYSSES 8 TOWNSHIP, BRIDGE REPLACEMENT 136,000 9 (BASE PROJECT ALLOCATION - $77,000) 10 (LAND ALLOCATION - $20,000) 11 (DESIGN AND CONTINGENCIES - $39,000) 12 (56) SR 1003 OVER FORK OF GENESEE, HECTOR 13 TOWNSHIP, BRIDGE REHABILITATION 362,000 14 (BASE PROJECT ALLOCATION - $228,000) 15 (LAND ALLOCATION - $20,000) 16 (DESIGN AND CONTINGENCIES - $114,000) 17 (57) SR 1003 OVER CUSHING RUN, HECTOR 18 TOWNSHIP, BRIDGE REPLACEMENT 188,000 19 (BASE PROJECT ALLOCATION - $112,000) 20 (LAND ALLOCATION - $20,000) 21 (DESIGN AND CONTINGENCIES - $56,000) 22 (58) SR 1003 OVER BRANCH OF GENESEE RIVER, 23 ULYSSES BOROUGH, BRIDGE REPLACEMENT 57,000 24 (BASE PROJECT ALLOCATION - $30,000) 25 (LAND ALLOCATION - $20,000) 26 (DESIGN AND CONTINGENCIES - $7,000) 27 (59) SR 1003, BRIDGE NO.30294 OVER 28 CALIFORNIA RUN, ULYSSES TOWNSHIP, 29 BRIDGE REPLACEMENT 118,000 30 (BASE PROJECT ALLOCATION - $65,000) 20080S1503B2474 - 318 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $33,000) 3 (60) SR 1003, BRIDGE NO.30295 OVER 4 CALIFORNIA RUN, ULYSSES TOWNSHIP, 5 BRIDGE REPLACEMENT 62,000 6 (BASE PROJECT ALLOCATION - $28,000) 7 (LAND ALLOCATION - $20,000) 8 (DESIGN AND CONTINGENCIES - $14,000) 9 (61) SR 1005 OVER PHOENIX RUN, HECTOR 10 TOWNSHIP, BRIDGE REPLACEMENT 247,000 11 (BASE PROJECT ALLOCATION - $151,000) 12 (LAND ALLOCATION - $20,000) 13 (DESIGN AND CONTINGENCIES - $76,000) 14 (62) SR 1005 OVER BRANCH OF PHOENIX CREEK, 15 PIKE TOWNSHIP, BRIDGE REPLACEMENT 60,000 16 (BASE PROJECT ALLOCATION - $30,000) 17 (LAND ALLOCATION - $20,000) 18 (DESIGN AND CONTINGENCIES - $10,000) 19 (63) SR 1005, BRIDGE NO.30299 OVER LITTLE 20 PHOENIX RUN, PIKE TOWNSHIP, BRIDGE 21 REPLACEMENT 178,000 22 (BASE PROJECT ALLOCATION - $105,000) 23 (LAND ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $53,000) 25 (64) SR 1009 OVER LUDINGTON RUN, ULYSSES 26 TOWNSHIP, BRIDGE REPLACEMENT 86,000 27 (BASE PROJECT ALLOCATION - $44,000) 28 (LAND ALLOCATION - $20,000) 29 (DESIGN AND CONTINGENCIES - $22,000) 30 (65) SR 1010 OVER MUNDY CREEK, BINGHAM 20080S1503B2474 - 319 -
1 TOWNSHIP, BRIDGE REPLACEMENT 62,000 2 (BASE PROJECT ALLOCATION - $30,000) 3 (LAND ALLOCATION - $20,000) 4 (DESIGN AND CONTINGENCIES - $12,000) 5 (66) SR 1015 OVER TURNER CREEK, BINGHAM 6 TOWNSHIP, BRIDGE REPLACEMENT 74,000 7 (BASE PROJECT ALLOCATION - $36,000) 8 (LAND ALLOCATION - $20,000) 9 (DESIGN AND CONTINGENCIES - $18,000) 10 (67) SR 1018 OVER MIDDLE BRANCH OF GENESEE 11 RIVER, GENESEE TOWNSHIP, BRIDGE 12 REHABILITATION 330,000 13 (BASE PROJECT ALLOCATION - $152,000) 14 (LAND ALLOCATION - $100,000) 15 (DESIGN AND CONTINGENCIES - $78,000) 16 (68) SR 1021 OVER COWANESQUE RIVER, 17 HARRISON TOWNSHIP, BRIDGE REPLACEMENT 184,000 18 (BASE PROJECT ALLOCATION - $109,000) 19 (LAND ALLOCATION - $20,000) 20 (DESIGN AND CONTINGENCIES - $55,000) 21 (69) SR 1021, BRIDGE NO.30335 OVER TEED 22 RUN, HECTOR TOWNSHIP, BRIDGE 23 REHABILITATION 155,000 24 (BASE PROJECT ALLOCATION - $90,000) 25 (LAND ALLOCATION - $20,000) 26 (DESIGN AND CONTINGENCIES - $45,000) 27 (70) SR 1021, BRIDGE NO.30336 OVER TEED 28 RUN, HECTOR TOWNSHIP, BRIDGE 29 REPLACEMENT 62,000 30 (BASE PROJECT ALLOCATION - $30,000) 20080S1503B2474 - 320 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $12,000) 3 (71) SR 2001 OVER KETTLE CREEK, ABBOTT 4 TOWNSHIP, BRIDGE REPLACEMENT 49,000 5 (BASE PROJECT ALLOCATION - $19,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $10,000) 8 (72) SR 3001 OVER MUD LICK RUN, WHARTON 9 TOWNSHIP, BRIDGE REPLACEMENT 79,000 10 (BASE PROJECT ALLOCATION - $39,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $20,000) 13 (73) SR 3002 OVER COWLEY RUN, PORTAGE 14 TOWNSHIP, BRIDGE REPLACEMENT 56,000 15 (BASE PROJECT ALLOCATION - $24,000) 16 (LAND ALLOCATION - $20,000) 17 (DESIGN AND CONTINGENCIES - $12,000) 18 (74) SR 3004 OVER DRY BED STREAM, ROULETTE 19 TOWNSHIP, BRIDGE REPLACEMENT 92,000 20 (BASE PROJECT ALLOCATION - $48,000) 21 (LAND ALLOCATION - $20,000) 22 (DESIGN AND CONTINGENCIES - $24,000) 23 (75) SR 3007 OVER CARD CREEK, ROULETTE 24 TOWNSHIP, BRIDGE REPLACEMENT 61,000 25 (BASE PROJECT ALLOCATION - $30,000) 26 (LAND ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $11,000) 28 (76) SR 4001 OVER BRANCH OF SARTWELL 29 CREEK, PLEASANT VALLEY TOWNSHIP, BRIDGE 30 REPLACEMENT 56,000 20080S1503B2474 - 321 -
1 (BASE PROJECT ALLOCATION - $30,000) 2 (LAND ALLOCATION - $20,000) 3 (DESIGN AND CONTINGENCIES - $6,000) 4 (77) SR 4001 OVER SARTWELL CREEK, PLEASANT 5 VALLEY TOWNSHIP, BRIDGE REPLACEMENT 212,000 6 (BASE PROJECT ALLOCATION - $121,000) 7 (LAND ALLOCATION - $20,000) 8 (DESIGN AND CONTINGENCIES - $61,000) 9 (78) SR 4003, BRIDGE NO.30407 OVER BRADLEY 10 RUN, CLARA TOWNSHIP, BRIDGE 11 REPLACEMENT 106,000 12 (BASE PROJECT ALLOCATION - $57,000) 13 (LAND ALLOCATION - $20,000) 14 (DESIGN AND CONTINGENCIES - $29,000) 15 (79) SR 4003, BRIDGE NO.30408 OVER BRADLEY 16 RUN, CLARA TOWNSHIP, BRIDGE 17 REHABILITATION 146,000 18 (BASE PROJECT ALLOCATION - $84,000) 19 (LAND ALLOCATION - $20,000) 20 (DESIGN AND CONTINGENCIES - $42,000) 21 (80) SR 4005 OVER DRY RUN, HEBRON 22 TOWNSHIP, BRIDGE REPLACEMENT 73,000 23 (BASE PROJECT ALLOCATION - $35,000) 24 (LAND ALLOCATION - $20,000) 25 (DESIGN AND CONTINGENCIES - $18,000) 26 (81) SR 4005 OVER NORTH HOLLOW CREEK, 27 HEBRON TOWNSHIP, BRIDGE REPLACEMENT 63,000 28 (BASE PROJECT ALLOCATION - $30,000) 29 (LAND ALLOCATION - $20,000) 30 (DESIGN AND CONTINGENCIES - $13,000) 20080S1503B2474 - 322 -
1 (82) SR 4013 OVER ALLEGANY RIVER, ALLEGANY 2 TOWNSHIP, BRIDGE REPLACEMENT 223,000 3 (BASE PROJECT ALLOCATION - $135,000) 4 (LAND ALLOCATION - $20,000) 5 (DESIGN AND CONTINGENCIES - $68,000) 6 (83) SR 4016 OVER OREBED CREEK, GENESEE 7 TOWNSHIP, BRIDGE REPLACEMENT 56,000 8 (BASE PROJECT ALLOCATION - $30,000) 9 (LAND ALLOCATION - $20,000) 10 (DESIGN AND CONTINGENCIES - $6,000) 11 (84) SR 4017 OVER BRANCH OF OSWAYO CREEK, 12 SHARON TOWNSHIP, BRIDGE REPLACEMENT 62,000 13 (BASE PROJECT ALLOCATION - $30,000) 14 (LAND ALLOCATION - $20,000) 15 (DESIGN AND CONTINGENCIES - $12,000) 16 (85) SR 4025 OVER HEMLOCK HOLLOW RUN, 17 OSWAYO TOWNSHIP, BRIDGE REPLACEMENT 133,000 18 (BASE PROJECT ALLOCATION - $75,000) 19 (LAND ALLOCATION - $20,000) 20 (DESIGN AND CONTINGENCIES - $38,000) 21 (86) SR 4026 OVER FISHING CREEK, ROULETTE 22 TOWNSHIP, BRIDGE REPLACEMENT 224,000 23 (BASE PROJECT ALLOCATION - $136,000) 24 (LAND ALLOCATION - $20,000) 25 (DESIGN AND CONTINGENCIES - $68,000) 26 (87) SR 4031 OVER LYMAN CREEK, SWEDEN 27 TOWNSHIP, BRIDGE REPLACEMENT 61,000 28 (BASE PROJECT ALLOCATION - $30,000) 29 (LAND ALLOCATION - $20,000) 30 (DESIGN AND CONTINGENCIES - $11,000) 20080S1503B2474 - 323 -
1 (88) SR 1005, BRIDGE NO.30302 OVER LITTLE
2 PHOENIX RUN, PIKE TOWNSHIP, BRIDGE
3 REPLACEMENT 62,000
4 (BASE PROJECT ALLOCATION - $28,000)
5 (LAND ALLOCATION - $20,000)
6 (DESIGN AND CONTINGENCIES - $14,000)
7 (89) SR 4019 OVER OSWAYO CREEK,
8 SHINGLEHOUSE BOROUGH, BRIDGE
9 REHABILITATION 886,000
10 (BASE PROJECT ALLOCATION - $577,000)
11 (LAND ALLOCATION - $20,000)
12 (DESIGN AND CONTINGENCIES - $289,000)
13 Section 58. Schuylkill County.
14 (a) Local Bridges (Reserved) <--
15 (A) LOCAL BRIDGES <--
16 (1) BRANCH TOWNSHIP, SR 0209, LR 199 OVER
17 READING NORTHERN RAILROAD, BRIDGE
18 REHABILITATION 1,469,000
19 (BASE PROJECT ALLOCATION - $1,028,000)
20 (DESIGN AND CONTINGENCIES - $441,000)
21 (b) State Bridges
22 (1) I-81 Southbound, Section 1341 over
23 Reading & Northern Railroad, Delano
24 Township, Bridge Rehabilitation 497,000
25 (Base Project Allocation - $400,000)
26 (Land Allocation - $20,000)
27 (Design and Contingencies - $77,000)
28 (2) I-81 Southbound, Section 1365 over
29 Reading & Northern Railroad, Delano
30 Township, Bridge Rehabilitation 497,000
20080S1503B2474 - 324 -
1 (Base Project Allocation - $400,000) 2 (Land Allocation - $20,000) 3 (Design and Contingencies - $77,000) 4 (3) I-81 Southbound, Section 1374 over 5 Reading & Northern Railroad, Kline 6 Township, Bridge Rehabilitation 497,000 7 (Base Project Allocation - $400,000) 8 (Land Allocation - $20,000) 9 (Design and Contingencies - $77,000) 10 (4) SR 8017 over T-906 Main Street 11 Haddock, Kline Township, Bridge 12 Rehabilitation 497,000 13 (Base Project Allocation - $400,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $77,000) 16 (5) SR 8017 over LR 185, PA 309, Kline 17 Township, Bridge Rehabilitation 497,000 18 (Base Project Allocation - $400,000) 19 (Land Allocation - $20,000) 20 (Design and Contingencies - $77,000) 21 (6) US 209 over Swatara Creek, Reilly 22 Township, Bridge Replacement 500,000 23 (Base Project Allocation - $200,000) 24 (Land Allocation - $50,000) 25 (Design and Contingencies - $250,000) 26 (7) SR 4016 over Little Mahantango Creek, 27 Upper Mahantango Township, Bridge 28 Replacement 2,000,000 29 (Base Project Allocation - $1,000,000) 30 (Land Allocation - $350,000) 20080S1503B2474 - 325 -
1 (Design and Contingencies - $650,000) 2 (8) PA 309 over Lizard Creek, West Penn 3 Township, Bridge Replacement 800,000 4 (Base Project Allocation - $300,000) 5 (Land Allocation - $100,000) 6 (Design and Contingencies - $400,000) 7 (9) PA 125, LR 339 OVER PINE CREEK, HEGINS <-- 8 TOWNSHIP, BRIDGE REHABILITATION 316,000 9 (BASE PROJECT ALLOCATION - $221,000) 10 (DESIGN AND CONTINGENCIES - $95,000) 11 (10) PA 125, LR 53053 OVER TRIBUTARY OF 12 DEEP CREEK, HEGINS TOWNSHIP, BRIDGE 13 REHABILITATION 79,000 14 (BASE PROJECT ALLOCATION - $55,000) 15 (DESIGN AND CONTINGENCIES - $24,000) 16 (11) PA 309, LR 226 OVER LIZARD CREEK, 17 WEST PENN TOWNSHIP, BRIDGE REPLACEMENT 4,125,000 18 (BASE PROJECT ALLOCATION - $3,125,000) 19 (DESIGN AND CONTINGENCIES - $1,000,000) 20 (12) PA 339, LR 53063 OVER MAHANOY CREEK, 21 MAHANOY CITY BOROUGH, BRIDGE 22 REHABILITATION 275,000 23 (BASE PROJECT ALLOCATION - $192,000) 24 (DESIGN AND CONTINGENCIES - $83,000) 25 (13) PA 443, LR 140 OVER SOUTH BRANCH OF 26 SWATARA CREEK, PINE GROVE TOWNSHIP, 27 BRIDGE REHABILITATION 587,000 28 (BASE PROJECT ALLOCATION - $411,000) 29 (DESIGN AND CONTINGENCIES - $176,000) 30 (14) PA 443, LR 140 OVER SCHUYLKILL RIVER, 20080S1503B2474 - 326 -
1 SCHUYLKILL HAVEN BOROUGH, BRIDGE 2 REHABILITATION 897,000 3 (BASE PROJECT ALLOCATION - $628,000) 4 (DESIGN AND CONTINGENCIES - $269,000) 5 (15) PA 901, LR 53008 OVER WEST BRANCH OF 6 SCHUYLKILL RIVER, NORTH MANHEIM 7 TOWNSHIP, BRIDGE REHABILITATION 685,000 8 (BASE PROJECT ALLOCATION - $479,000) 9 (DESIGN AND CONTINGENCIES - $206,000) 10 (16) PA 924, A-6850, BRIDGE NO.30733 OVER 11 TRIBUTARY OF CATAWISSA CREEK, EAST 12 UNION TOWNSHIP, BRIDGE REHABILITATION 95,000 13 (BASE PROJECT ALLOCATION - $66,000) 14 (DESIGN AND CONTINGENCIES - $29,000) 15 (17) PA 924, A-6850, BRIDGE NO.30734 OVER 16 TRIBUTARY OF CATAWISSA CREEK, EAST 17 UNION TOWNSHIP, BRIDGE REHABILITATION 82,000 18 (BASE PROJECT ALLOCATION - $57,000) 19 (DESIGN AND CONTINGENCIES - $25,000) 20 (18) PA 924, A-6850, BRIDGE NO.30735 OVER 21 TRIBUTARY OF CATAWISSA CREEK, EAST 22 UNION TOWNSHIP, BRIDGE REHABILITATION 82,000 23 (BASE PROJECT ALLOCATION - $57,000) 24 (DESIGN AND CONTINGENCIES - $25,000) 25 (19) PA 924, LR 161 OVER SR 4030, RAILROAD 26 TRACKS AND MAHAN CREEK, GILBERTON 27 BOROUGH, BRIDGE REHABILITATION 5,045,000 28 (BASE PROJECT ALLOCATION - $3,531,000) 29 (DESIGN AND CONTINGENCIES - $1,514,000) 30 (20) PA 924, LR 464 OVER REMOVED RAILROAD 20080S1503B2474 - 327 -
1 AND CREEK, SHENANDOAH BOROUGH, BRIDGE 2 REHABILITATION 2,970,000 3 (BASE PROJECT ALLOCATION - $2,079,000) 4 (DESIGN AND CONTINGENCIES - $891,000) 5 (21) SR 1005, LR 53046 OVER TRIBUTARY OF 6 TOMHICKEN CREEK, EAST UNION TOWNSHIP, 7 BRIDGE REHABILITATION 63,000 8 (BASE PROJECT ALLOCATION - $44,000) 9 (DESIGN AND CONTINGENCIES - $19,000) 10 (22) SR 1006, LR 53087 OVER MILL CREEK, 11 SAINT CLAIR BOROUGH, BRIDGE 12 REHABILITATION 476,000 13 (BASE PROJECT ALLOCATION - $333,000) 14 (DESIGN AND CONTINGENCIES - $143,000) 15 (23) SR 1008, LR 53035 OVER TRIBUTARY OF 16 MILL CREEK, WEST MAHANOY TOWNSHIP, 17 BRIDGE REHABILITATION 69,000 18 (BASE PROJECT ALLOCATION - $48,000) 19 (DESIGN AND CONTINGENCIES - $21,000) 20 (24) SR 1016, LR 53045 OVER LOFTY CREEK, 21 KLINE TOWNSHIP, BRIDGE REHABILITATION 57,000 22 (BASE PROJECT ALLOCATION - $40,000) 23 (DESIGN AND CONTINGENCIES - $17,000) 24 (26) SR 1020, LR 53040 OVER LOFTY CREEK, 25 RUSH TOWNSHIP, BRIDGE REHABILITATION 84,000 26 (BASE PROJECT ALLOCATION - $59,000) 27 (DESIGN AND CONTINGENCIES - $25,000) 28 (27) SR 1021, LR 53217 OVER CARBON & 29 SCHUYLKILL RAILROAD, RUSH TOWNSHIP, 30 BRIDGE REHABILITATION 193,000 20080S1503B2474 - 328 -
1 (BASE PROJECT ALLOCATION - $135,000) 2 (DESIGN AND CONTINGENCIES - $58,000) 3 (27) SR 2010, LR 53009 OVER MAHANOY CREEK, 4 NORTH MANHEIM TOWNSHIP, BRIDGE 5 REHABILITATION 120,000 6 (BASE PROJECT ALLOCATION - $84,000) 7 (DESIGN AND CONTINGENCIES - $36,000) 8 (28) SR 3002, LR 53004 OVER SWATARA CREEK, 9 WASHINGTON TOWNSHIP, BRIDGE 10 REHABILITATION 459,000 11 (BASE PROJECT ALLOCATION - $321,000) 12 (DESIGN AND CONTINGENCIES - $138,000) 13 (29) SR 0309, LR 185 OVER BACKFILLED 14 CHANNEL, KLINE TOWNSHIP, BRIDGE 15 REHABILITATION 104,000 16 (BASE PROJECT ALLOCATION - $73,000) 17 (DESIGN AND CONTINGENCIES - $31,000) 18 (30) SR 0339, LR 53091 OVER TRIBUTARY OF 19 CATAWISSA CREEK, NORTH UNION TOWNSHIP, 20 BRIDGE REHABILITATION 106,000 21 (BASE PROJECT ALLOCATION - $74,000) 22 (DESIGN AND CONTINGENCIES - $32,000) 23 (31) SR 4008, LR 53072 OVER WEST BRANCH OF 24 SCHUYLKILL RIVER, CASS TOWNSHIP, BRIDGE 25 REHABILITATION 92,000 26 (BASE PROJECT ALLOCATION - $64,000) 27 (DESIGN AND CONTINGENCIES - $28,000) 28 (32) SR 4014, LR 53078 OVER MAHANTANGO 29 CREEK, UPPER MAHANTANGO TOWNSHIP, 30 BRIDGE REHABILITATION 283,000 20080S1503B2474 - 329 -
1 (BASE PROJECT ALLOCATION - $198,000) 2 (DESIGN AND CONTINGENCIES - $85,000) 3 (33) SR 4016, LR 53047 OVER MAHANTANGO 4 CREEK, UPPER MAHANTANGO TOWNSHIP, 5 BRIDGE REHABILITATION 396,000 6 (BASE PROJECT ALLOCATION - $277,000) 7 (DESIGN AND CONTINGENCIES - $119,000) 8 (34) SR 4016, LR 53047 OVER LITTLE 9 MAHANTANGO CREEK, UPPER MAHANTANGO 10 TOWNSHIP, BRIDGE REPLACEMENT 1,175,000 11 (BASE PROJECT ALLOCATION - $1,000,000) 12 (DESIGN AND CONTINGENCIES - $175,000) 13 (35) SR 4017, LR 53049 OVER PINE CREEK, 14 HUBLEY TOWNSHIP, BRIDGE REHABILITATION 399,000 15 (BASE PROJECT ALLOCATION - $279,000) 16 (DESIGN AND CONTINGENCIES - $120,000) 17 (36) SR 4026, LR 53111 OVER BIG RUN CREEK, 18 BUTLER TOWNSHIP, BRIDGE REHABILITATION 139,000 19 (BASE PROJECT ALLOCATION - $97,000) 20 (DESIGN AND CONTINGENCIES - $42,000) 21 (37) SR 4026, LR 53111 OVER MAHANOY CREEK, 22 BUTLER TOWNSHIP, BRIDGE REHABILITATION 472,000 23 (BASE PROJECT ALLOCATION - $330,000) 24 (DESIGN AND CONTINGENCIES - $142,000) 25 (38) SR 4037, LR 53067 OVER DARK RUN, 26 RINGTOWN BOROUGH, BRIDGE 27 REHABILITATION 108,000 28 (BASE PROJECT ALLOCATION - $75,000) 29 (DESIGN AND CONTINGENCIES - $33,000) 30 (39) PA 309, LR 226 OVER KERSHNERS CREEK, 20080S1503B2474 - 330 -
1 WEST PENN TOWNSHIP, BRIDGE 2 REHABILITATION 485,000 3 (BASE PROJECT ALLOCATION - $405,000) 4 (DESIGN AND CONTINGENCIES - $80,000) 5 (40) SR 61, LR 141 OVER MAHANNON CREEK, 6 NORTH MANHEIM TOWNSHIP, BRIDGE 7 REHABILITATION 000,000 8 Section 59. Snyder County. 9 (a) Local Bridges 10 (1) West Perry Township, Crater Hill over 11 West Branch of Mahantango Creek, Bridge 12 Replacement 24,000 13 (Design and Contingencies - $24,000) 14 (2) Middlecreek Township, T-418 over 15 Unnamed Tributary, Bridge Replacement 165,000 16 (Base Project Allocation - $150,000) 17 (Design and Contingencies - $15,000) 18 (3) MIDDLECREEK TOWNSHIP, FREEBURG ROAD <-- 19 OVER TRIBUTARY OF MIDDLE CREEK, BRIDGE 20 REPLACEMENT 80,000 21 (BASE PROJECT ALLOCATION - $80,000) 22 (4) MIDDLECREEK TOWNSHIP, T-418, FREEBURG 23 ROAD OVER TRIBUTARY OF MIDDLE CREEK, 24 BRIDGE REPLACEMENT 115,000 25 (BASE PROJECT ALLOCATION - $75,000) 26 (LAND ALLOCATION - $25,000) 27 (DESIGN AND CONTINGENCIES - $15,000) 28 (b) State Bridges 29 (1) SR 0522 over Wetzel Run, Beaver 30 Township, Bridge Replacement 150,000 20080S1503B2474 - 331 -
1 (Base Project Allocation - $120,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $20,000) 4 (2) SR 3007 over Middle Creek, Franklin 5 Township, Bridge Replacement 1,850,000 6 (Base Project Allocation - $1,500,000) 7 (Land Allocation - $30,000) 8 (Design and Contingencies - $320,000) 9 (3) SR 1007 over Middle Creek, Middle 10 Creek Township, Bridge Rehabilitation 530,000 11 (Base Project Allocation - $500,000) 12 (Design and Contingencies - $30,000) 13 (4) Ramp 8007 over US 11/15, Monroe 14 Township, Bridge Rehabilitation 138,000 15 (Base Project Allocation - $130,000) 16 (Design and Contingencies - $8,000) 17 (5) SR 1016, Kratzerville Road over 18 Tributary of Penns Creek, Monroe 19 Township, Bridge Replacement 200,000 20 (Base Project Allocation - $200,000) 21 (6) SR 0015 Northbound over Carrie Run, 22 Monroe Township, Bridge Rehabilitation 215,000 23 (Base Project Allocation - $200,000) 24 (Design and Contingencies - $15,000) 25 (7) SR 1020 over Carrie Run, Monroe 26 Township, Bridge Replacement 150,000 27 (Base Project Allocation - $120,000) 28 (Design and Contingencies - $30,000) 29 (8) SR 11/15 Southbound Lane over SR 0522, 30 Monroe Township, Bridge Rehabilitation 138,000 20080S1503B2474 - 332 -
1 (Base Project Allocation - $130,000) 2 (Design and Contingencies - $8,000) 3 (9) SR 3016, Pine Swamp Road over Branch 4 of Mahantango Creek, Perry Township, 5 Bridge Rehabilitation 525,000 6 (Base Project Allocation - $500,000) 7 (Design and Contingencies - $25,000) 8 (10) SR 3005, Quarry Road over Branch of 9 Mahantango Creek, Perry Township, 10 Bridge Replacement 130,000 11 (Base Project Allocation - $100,000) 12 (Design and Contingencies - $30,000) 13 (11) SR 3004 over Branch of Mahantango 14 Creek, Perry Township, Bridge 15 Rehabilitation 510,000 16 (Base Project Allocation - $500,000) 17 (Design and Contingencies - $10,000) 18 (12) SR 4005, Middle Road over Krebs Gap 19 Run, Spring Township, Bridge 20 Rehabilitation 425,000 21 (Base Project Allocation - $400,000) 22 (Design and Contingencies - $25,000) 23 (13) SR 4008, Stage Road over Ulsh Gap 24 Run, Spring Township, Bridge 25 Rehabilitation 1,100,000 26 (Base Project Allocation - $950,000) 27 (Land Allocation - $30,000) 28 (Design and Contingencies - $120,000) 29 (14) SR 2013 over Tributary of Susquehanna 30 River, Union Township, Bridge 20080S1503B2474 - 333 -
1 Replacement 170,000 2 (Base Project Allocation - $120,000) 3 (Land Allocation - $20,000) 4 (Design and Contingencies - $30,000) 5 (15) SR 2006, Bridge No.31180 over Spring 6 Creek, Washington Township, Bridge 7 Replacement 150,000 8 (Base Project Allocation - $120,000) 9 (Design and Contingencies - $30,000) 10 (16) FREBURG ROAD, T-418 OVER TRIBUTARY OF <-- 11 MIDDLE CREEK, VILLAGE OF KREAMER, 12 MIDDLECREEK TOWNSHIP, BRIDGE 13 REPLACEMENT 92,000 14 (BASE PROJECT ALLOCATION - $60,000) 15 (LAND ALLOCATION - $20,000) 16 (DESIGN AND CONTINGENCIES - $12,000) 17 Section 60. Somerset County. 18 (a) Local Bridges 19 (1) Garrett Borough, Garrett Crossing over 20 SR 2037 and Abandoned Railroad, Bridge 21 Construction 200,000 22 (Base Project Allocation - $200,000) 23 (b) State Bridges 24 (1) SR 0601 over Quemahoning Creek, 25 Boswell Borough, Bridge Replacement 2,940,000 26 (Base Project Allocation - $2,564,000) 27 (Land Allocation - $132,000) 28 (Design and Contingencies - $244,000) 29 (2) SR 2005 over Elk Lick Creek, Elk Lick 30 Township, Bridge Rehabilitation 130,000 20080S1503B2474 - 334 -
1 (Base Project Allocation - $130,000) 2 (3) SR 3003 over Tributary of 3 Youghiogheny, Lower Turkeyfoot 4 Township, Bridge Rehabilitation 170,000 5 (Base Project Allocation - $170,000) 6 (4) PA 160, GRAHAM AVENUE OVER PAINT <-- 7 CREEK, WINDBER BOROUGH, BRIDGE 8 REHABILITATION 122,000 9 (BASE PROJECT ALLOCATION - $122,000) 10 (5) WINDBER, 17TH STREET OVER PA 56 AND 11 SEESE RUN, WINDBER BOROUGH, BRIDGE 12 REHABILITATION 208,000 13 (BASE PROJECT ALLOCATION - $208,000) 14 Section 61. Sullivan County. 15 (a) Local Bridges (Reserved) 16 (b) State Bridges 17 (1) SR 0220 over Little Loyalsock Creek, 18 Dushore Borough, Bridge Replacement 1,160,000 19 (Base Project Allocation - $800,000) 20 (Land Allocation - $30,000) 21 (Design and Contingencies - $330,000) 22 (2) SR 4007 over Kings Creek, Elkland 23 Township, Bridge Replacement 145,000 24 (Base Project Allocation - $130,000) 25 (Land Allocation - $4,000) 26 (Design and Contingencies - $11,000) 27 (3) SR 3009 over Rock Run, Shrewsbury 28 Township, Bridge Replacement 120,000 29 (Base Project Allocation - $120,000) 30 (4) SR 2002 OVER MUNCY CREEK, DAVIDSON <-- 20080S1503B2474 - 335 -
1 TOWNSHIP, BRIDGE REHABILITATION 676,000 2 (BASE PROJECT ALLOCATION - $626,000) 3 (DESIGN AND CONTINGENCIES - $50,000) 4 Section 62. Susquehanna County. 5 (a) Local Bridges 6 (1) Choconut Township, Carmalt Road T-695 7 over Choconut Creek, Bridge 8 Replacement 356,000 9 (Base Project Allocation - $320,000) 10 (Design and Contingencies - $36,000) 11 (2) Springville Township, T-393, Lynn 12 Cemetery Road over White's Creek, 13 Bridge Replacement 445,000 14 (Base Project Allocation - $405,000) 15 (Design and Contingencies - $40,000) 16 (b) State Bridges 17 (1) SR 0706 over Pettis Creek, Bridgewater 18 Township, Bridge Rehabilitation 532,000 19 (Base Project Allocation - $367,000) 20 (Land Allocation - $37,000) 21 (Design and Contingencies - $128,000) 22 (2) SR 0167 over Hop Bottom Creek, 23 Brooklyn Township, Bridge 24 Rehabilitation 229,000 25 (Base Project Allocation - $158,000) 26 (Land Allocation - $16,000) 27 (Design and Contingencies - $55,000) 28 (3) SR 1018 over Tributary of Dubois 29 Creek, Franklin Township, Bridge 30 Replacement 596,000 20080S1503B2474 - 336 -
1 (Base Project Allocation - $411,000) 2 (Land Allocation - $42,000) 3 (Design and Contingencies - $143,000) 4 (4) SR 0092 over Tributary of Tunkhannock 5 Creek, Gibson Township, Bridge 6 Replacement 726,000 7 (Base Project Allocation - $501,000) 8 (Land Allocation - $51,000) 9 (Design and Contingencies - $174,000) 10 (5) SR 0706 over Roe Creek, Jessup 11 Township, Bridge Rehabilitation 21,000 12 (Base Project Allocation - $14,000) 13 (Land Allocation - $2,000) 14 (Design and Contingencies - $5,000) 15 (6) SR 1009 over Starrucca Creek, 16 Lanesboro Borough, Bridge 17 Rehabilitation 199,000 18 (Base Project Allocation - $137,000) 19 (Land Allocation - $14,000) 20 (Design and Contingencies - $48,000) 21 (7) SR 0081 Northbound over East Branch of 22 Tunkhannock Creek, Lenox Township, 23 Bridge Rehabilitation 328,000 24 (Base Project Allocation - $325,000) 25 (Land Allocation - $3,000) 26 (8) SR 0081 Southbound over East Branch of 27 Tunkhannock Creek, Lenox Township, 28 Bridge Rehabilitation 328,000 29 (Base Project Allocation - $325,000) 30 (Land Allocation - $3,000) 20080S1503B2474 - 337 -
1 (9) SR 0092 over Leslie Creek, Lenox 2 Township, Bridge Rehabilitation 327,000 3 (Base Project Allocation - $225,000) 4 (Land Allocation - $22,000) 5 (Design and Contingencies - $80,000) 6 (10) SR 2019 over Willow Brook, Lenox 7 Township, Bridge Replacement 585,000 8 (Base Project Allocation - $500,000) 9 (Land Allocation - $35,000) 10 (Design and Contingencies - $50,000) 11 (11) SR 2043 over Millard Creek, Lenox 12 Township, Bridge Rehabilitation 170,000 13 (Base Project Allocation - $117,000) 14 (Land Allocation - $12,000) 15 (Design and Contingencies - $41,000) 16 (12) SR 0029 over Jones Creek, Liberty 17 Township, Bridge Rehabilitation 497,000 18 (Base Project Allocation - $343,000) 19 (Land Allocation - $35,000) 20 (Design and Contingencies - $119,000) 21 (13) SR 0858 over Summers Creek, 22 Middletown Township, Bridge 23 Rehabilitation 113,000 24 (Base Project Allocation - $78,000) 25 (Land Allocation - $8,000) 26 (Design and Contingencies - $27,000) 27 (14) SR 0011 over Branch of Salt Lick 28 Creek, New Milford Borough, Bridge 29 Rehabilitation 112,000 30 (Base Project Allocation - $77,000) 20080S1503B2474 - 338 -
1 (Land Allocation - $8,000) 2 (Design and Contingencies - $27,000) 3 (15) SR 0011 over Salt Lick Creek, New 4 Milford Township, Bridge 5 Rehabilitation 308,000 6 (Base Project Allocation - $212,000) 7 (Land Allocation - $22,000) 8 (Design and Contingencies - $74,000) 9 (16) SR 0092 over Branch of Drinkers 10 Creek, Oakland Township, Bridge 11 Rehabilitation 284,000 12 (Base Project Allocation - $196,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $68,000) 15 (17) SR 1005 over Starrucca Creek, 16 Thompson Borough, Bridge 17 Rehabilitation 92,000 18 (Base Project Allocation - $63,000) 19 (Land Allocation - $7,000) 20 (Design and Contingencies - $22,000) 21 (18) SR 1007 over South Branch of 22 Canawacta Creek, Thompson Township, 23 Bridge Rehabilitation 299,000 24 (Base Project Allocation - $206,000) 25 (Land Allocation - $21,000) 26 (Design and Contingencies - $72,000) 27 (19) SR 4024 over Branch of Elkhorn Creek, 28 Farmington Township, Bridge 29 Replacement 180,000 30 (Base Project Allocation - $150,000) 20080S1503B2474 - 339 -
1 (Design and Contingencies - $30,000) 2 (20) SR 0267, 0.1 MILE SOUTH OF TR 706 <-- 3 OVER BRANCH OF WYALUSING CREEK, RUSH 4 TOWNSHIP, BRIDGE RESTORATION 85,000 5 (LAND ALLOCATION - $85,000) 6 Section 63. Tioga County. 7 (a) Local Bridges 8 (1) Wellsboro Borough, King Street over 9 Kelsey Creek, Bridge Replacement 267,000 10 (Base Project Allocation - $225,000) 11 (Land Allocation - $6,000) 12 (Design and Contingencies - $36,000) 13 (b) State Bridges 14 (1) SR 4007 over North Brook, Brookfield 15 Township, Bridge Replacement 270,000 16 (Base Project Allocation - $200,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $60,000) 19 (2) SR 4035 over Catlin Hollow Creek, 20 Charleston Township, Bridge 21 Replacement 973,000 22 (Base Project Allocation - $823,000) 23 (Land Allocation - $30,000) 24 (Design and Contingencies - $120,000) 25 (3) SR 4013 over Yarnell Run, Deerfield 26 Township, Bridge Replacement 120,000 27 (Base Project Allocation - $120,000) 28 (4) SR 0287 over Marsh Creek, Delmar 29 Township, Bridge Rehabilitation 120,000 30 (Base Project Allocation - $120,000) 20080S1503B2474 - 340 -
1 (5) SR 3007 over West Branch of Stonyfork 2 Creek, Delmar Township, Bridge 3 Replacement 190,000 4 (Base Project Allocation - $120,000) 5 (Land Allocation - $20,000) 6 (Design and Contingencies - $50,000) 7 (6) SR 3019 over Tributary of Wilson 8 Creek, Delmar Township, Bridge 9 Replacement 160,000 10 (Base Project Allocation - $120,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $30,000) 13 (7) SR 3001 over Buck Run, Elk Township, 14 Bridge Replacement 190,000 15 (Base Project Allocation - $120,000) 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $50,000) 18 (8) SR 4024 over Branch of Elkhorn Creek, 19 Farmington Township, Bridge 20 Replacement 180,000 21 (Base Project Allocation - $150,000) 22 (Design and Contingencies - $30,000) 23 (9) SR 0328 over Tributary of Bear Creek, 24 Jackson Township, Bridge 25 Rehabilitation 840,000 26 (Base Project Allocation - $700,000) 27 (Land Allocation - $40,000) 28 (Design and Contingencies - $100,000) 29 (10) SR 0328 over Bear Creek, Jackson 30 Township, Bridge Replacement 840,000 20080S1503B2474 - 341 -
1 (Base Project Allocation - $700,000) 2 (Land Allocation - $40,000) 3 (Design and Contingencies - $100,000) 4 (11) SR 0549 over Seely Creek, Jackson 5 Township, Bridge Replacement 1,230,000 6 (Base Project Allocation - $1,000,000) 7 (Land Allocation - $30,000) 8 (Design and Contingencies - $200,000) 9 (12) SR 2022 over Wilson Creek, Putnam 10 Township, Bridge Replacement 150,000 11 (Base Project Allocation - $120,000) 12 (Design and Contingencies - $30,000) 13 (13) SR 1007 over Tributary of Elk Run, 14 Rutland Township, Bridge Replacement 150,000 15 (Base Project Allocation - $120,000) 16 (Design and Contingencies - $30,000) 17 (14) SR 3022 over Marsh Creek, Shippen 18 Township, Bridge Rehabilitation 1,250,000 19 (Base Project Allocation - $1,100,000) 20 (Land Allocation - $30,000) 21 (Design and Contingencies - $120,000) 22 (15) SR 0049, Bridge No.32821 over 23 Cowanesque River, Westfield Township, 24 Bridge Rehabilitation 240,000 25 (Base Project Allocation - $240,000) 26 (16) SR 0287 OVER CROOKED CREEK, <-- 27 MIDDLEBURY TOWNSHIP, BRIDGE 28 REHABILITATION 830,000 29 (BASE PROJECT ALLOCATION - $780,000) 30 (DESIGN AND CONTINGENCIES - $50,000) 20080S1503B2474 - 342 -
1 (17) SR 0049 OVER COWANESQUE RIVER, 2 WESTFIELD BOROUGH, BRIDGE 3 REHABILITATION 850,000 4 (BASE PROJECT ALLOCATION - $800,000) 5 (DESIGN AND CONTINGENCIES - $50,000) 6 (18) SR 2005 OVER BLOCKHOUSE CREEK, 7 LIBERTY TOWNSHIP, BRIDGE 8 REHABILITATION 119,000 9 (BASE PROJECT ALLOCATION - $87,000) 10 (LAND ALLOCATION - $11,000) 11 (DESIGN AND CONTINGENCIES - $21,000) 12 Section 64. Union County. 13 (a) Local Bridges (Reserved) 14 (b) State Bridges 15 (1) SR 1003, Hoffa Mill over Buffalo 16 Creek, Buffalo Township, Bridge 17 Replacement 877,000 18 (Base Project Allocation - $727,000) 19 (Land Allocation - $30,000) 20 (Design and Contingencies - $120,000) 21 (2) SR 2007 over Tributary of Bull Run, 22 East Buffalo Township, Bridge 23 Replacement 150,000 24 (Base Project Allocation - $120,000) 25 (Design and Contingencies - $30,000) 26 (3) SR 1012 over White Deer Hole Creek, 27 Gregg Township, Bridge Replacement 985,000 28 (Base Project Allocation - $835,000) 29 (Land Allocation - $30,000) 30 (Design and Contingencies - $120,000) 20080S1503B2474 - 343 -
1 (4) SR 3003, Bridge No.33546 over 2 Tributary of Penns Creek, Hartleton 3 Borough, Bridge Replacement 150,000 4 (Base Project Allocation - $120,000) 5 (Design and Contingencies - $30,000) 6 (5) SR 3002 over Tributary of Laurel Run, 7 Hartley Township, Bridge Replacement 150,000 8 (Base Project Allocation - $120,000) 9 (Design and Contingencies - $30,000) 10 (6) SR 3004, Bridge No.33551 over 11 Tributary of Penns Creek, Hartley 12 Township, Bridge Replacement 150,000 13 (Base Project Allocation - $120,000) 14 (Design and Contingencies - $30,000) 15 (7) SR 3003, Bridge No.33544 over 16 Tributary of Penns Creek, Lewis 17 Township, Bridge Replacement 190,000 18 (Base Project Allocation - $120,000) 19 (Land Allocation - $20,000) 20 (Design and Contingencies - $50,000) 21 (8) SR 3004, Bridge No.33554 over 22 Tributary of Penns Creek, Lewis 23 Township, Bridge Replacement 130,000 24 (Base Project Allocation - $100,000) 25 (Design and Contingencies - $30,000) 26 (9) SR 3005 over Coal Run, West Buffalo 27 Township, Bridge Replacement 140,000 28 (Base Project Allocation - $100,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $30,000) 20080S1503B2474 - 344 -
1 (10) SR 1010, 10 MILES WEST OF WHITE DEER <-- 2 OVER LICK RUN, WHITE DEER TOWNSHIP, 3 BRIDGE REHABILITATION 119,000 4 (BASE PROJECT ALLOCATION - $116,000) 5 (DESIGN AND CONTINGENCIES - $3,000) 6 (11) SR 1003, 2 MILES NORTH OF BUFFALO 7 CROSSROADS OVER BUFFALO CREEK, BUFFALO 8 TOWNSHIP, BRIDGE REHABILITATION 119,000 9 (BASE PROJECT ALLOCATION - $116,000) 10 (DESIGN AND CONTINGENCIES - $3,000) 11 (12) SR 1004, VILLAGE OF KELLY CROSSROADS 12 OVER LITTLE BUFFALO CREEK, KELLY 13 TOWNSHIP, BRIDGE REHABILITATION 119,000 14 (BASE PROJECT ALLOCATION - $116,000) 15 (DESIGN AND CONTINGENCIES - $3,000) 16 (13) SR 3003, 8TH STREET OVER BUFFALO 17 CREEK, MIFFLINBURG BOROUGH, BRIDGE 18 REHABILITATION 119,000 19 (BASE PROJECT ALLOCATION - $116,000) 20 (DESIGN AND CONTINGENCIES - $3,000) 21 (14) SR 3007 OVER NORTH BRANCH BUFFALO 22 CREEK, WEST BUFFALO TOWNSHIP, BRIDGE 23 REHABILITATION 362,000 24 (BASE PROJECT ALLOCATION - $351,000) 25 (DESIGN AND CONTINGENCIES - $11,000) 26 (15) SR 3007 OVER BUFFALO CREEK, WEST 27 BUFFALO TOWNSHIP, BRIDGE 28 REHABILITATION 362,000 29 (BASE PROJECT ALLOCATION - $351,000) 30 (DESIGN AND CONTINGENCIES - $11,000) 20080S1503B2474 - 345 -
1 Section 65. Venango County. 2 (a) Local Bridges (Reserved) 3 (b) State Bridges 4 (1) SR 0008 over SR 0080, Barkeyville 5 Borough, Bridge Rehabilitation 2,400,000 6 (Base Project Allocation - $2,300,000) 7 (Design and Contingencies - $100,000) 8 (2) SR 4018, Donation Hill Road over 9 Beatty Run, Canal Township, Bridge 10 Replacement 118,000 11 (Base Project Allocation - $118,000) 12 (3) SR 6008, Center Street over Oil Creek, 13 City of Oil City, Bridge 14 Rehabilitation 55,000 15 (Base Project Allocation - $55,000) 16 (4) SR 0008 over Branch of Slippery Rock, 17 Irwin Township, Bridge Replacement 850,000 18 (Base Project Allocation - $450,000) 19 (Land Allocation - $50,000) 20 (Design and Contingencies - $350,000) 21 (5) SR 0008 over Slippery Rock Creek, 22 Irwin Township, Bridge Rehabilitation 250,000 23 (Base Project Allocation - $150,000) 24 (Design and Contingencies - $100,000) 25 (6) SR 0208 over Marshall Run, Irwin 26 Township, Bridge Replacement 130,000 27 (Base Project Allocation - $130,000) 28 (7) SR 0062, Main Street over Little Sandy 29 Creek, Polk Borough, Bridge 30 Rehabilitation 17,000 20080S1503B2474 - 346 -
1 (Base Project Allocation - $17,000) 2 Section 66. Warren County. 3 (a) Local Bridges (Reserved) 4 (b) State Bridges 5 (1) SR 4003, Plank Road over Brokenstraw 6 Creek, Columbus Township, Bridge 7 Rehabilitation 40,000 8 (Base Project Allocation - $40,000) 9 (2) SR 4003, Plank Road over Branch of 10 Brokenstraw Creek, Columbus Township, 11 Bridge Rehabilitation 118,000 12 (Base Project Allocation - $118,000) 13 (3) SR 1013, Scandia Road over Fishburn 14 Run, Elk Township, Bridge 15 Rehabilitation 48,000 16 (Base Project Allocation - $48,000) 17 (4) SR 0069 over Branch of Jackson Run, 18 Farmington Township, Bridge 19 Replacement 200,000 20 (Base Project Allocation - $200,000) 21 (5) SR 0957 over Little Brokenstraw Creek, 22 Freehold Township, Bridge 23 Rehabilitation 54,000 24 (Base Project Allocation - $54,000) 25 (6) SR 0006, Dorcon Road over Ott Run, 26 Mead Township, Bridge Rehabilitation 34,000 27 (Base Project Allocation - $34,000) 28 (7) SR 0027, Grand Street over Branch of 29 Garland Run, Pittsfield Township, 30 Bridge Replacement 170,000 20080S1503B2474 - 347 -
1 (Base Project Allocation - $170,000) 2 (8) SR 3014, Cole Hill over Brokenstraw 3 Creek, Pittsfield Township, Bridge 4 Rehabilitation 48,000 5 (Base Project Allocation - $48,000) 6 (9) SR 2006 over Elkhorn Run, Pleasant 7 Township, Bridge Rehabilitation 575,000 8 (Base Project Allocation - $500,000) 9 (Design and Contingencies - $75,000) 10 (10) SR 0666 over South Branch of Tionesta 11 Creek, Sheffield Township, Bridge 12 Rehabilitation 130,000 13 (Base Project Allocation - $100,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $20,000) 16 (11) SR 0027 over Pine Creek, Southwest 17 Township, Bridge Rehabilitation 48,000 18 (Base Project Allocation - $48,000) 19 (12) SR 4002 over Branch of Whitney Run, 20 Spring Creek Township, Bridge 21 Rehabilitation 525,000 22 (Base Project Allocation - $425,000) 23 (Design and Contingencies - $100,000) 24 (13) SR 4013, Highland Avenue over 25 Matthews Run, Youngsville Borough, 26 Bridge Rehabilitation 48,000 27 (Base Project Allocation - $48,000) 28 Section 67. Washington County. 29 (a) Local Bridges 30 (1) Jefferson Township, Hanlin Station 20080S1503B2474 - 348 -
1 Bridge over Harmon Creek, Bridge 2 Removal 650,000 3 (Base Project Allocation - $650,000) 4 (2) McDonald Borough, SR 7422, Arabella 5 Street No.02 over Robbs Run, Bridge 6 Replacement 225,000 7 (Base Project Allocation - $135,000) 8 (Land Allocation - $30,000) 9 (Design and Contingencies - $60,000) 10 (3) Peters Township, TR-723, Galley Road 11 over Branch of Chartiers Creek, Bridge 12 Rehabilitation 1,000,000 13 (Base Project Allocation - $1,000,000) 14 (4) Peters Township, TR-986, Camp Lane 15 over Brush Run Creek, Bridge 16 Rehabilitation 1,000,000 17 (Base Project Allocation - $1,000,000) 18 (5) Jefferson Township, T-4005 over Hanlin 19 Station Road, Bridge Rehabilitation 500,000 20 (Base Project Allocation - $500,000) 21 (6) UNION AND PETERS TOWNSHIPS, SR 1006, <-- 22 VENETIA ROAD OVER PETERS CREEK, BRIDGE 23 REPLACEMENT 2,000,000 24 (BASE PROJECT ALLOCATION - $150,000) 25 (LAND ALLOCATION - $200,000) 26 (DESIGN AND CONTINGENCIES - $300,000) 27 (b) State Bridges 28 (1) SR 2005 over Little Tenmile Creek, 29 Amwell Township, Bridge Replacement 593,000 30 (Base Project Allocation - $463,000) 20080S1503B2474 - 349 -
1 (Land Allocation - $8,000) 2 (Design and Contingencies - $122,000) 3 (2) SR 4028 over Branch of Burgetts Fork, 4 Burgettstown Borough, Bridge 5 Replacement 635,000 6 (Base Project Allocation - $501,000) 7 (Land Allocation - $8,000) 8 (Design and Contingencies - $126,000) 9 (3) SR 1009 over Branch of Chartiers 10 Creek, Canonsburg Borough, Bridge 11 Replacement 1,400,000 12 (Base Project Allocation - $1,010,000) 13 (Land Allocation - $40,000) 14 (Design and Contingencies - $350,000) 15 (4) SR 0331, Bridge No.34689 over Branch 16 of Brush Run, Canton Township, Bridge 17 Replacement 775,000 18 (Base Project Allocation - $545,000) 19 (Land Allocation - $40,000) 20 (Design and Contingencies - $190,000) 21 (5) SR 0844 over Branch of Brush Run, 22 Canton Township, Bridge Replacement 850,000 23 (Base Project Allocation - $600,000) 24 (Land Allocation - $40,000) 25 (Design and Contingencies - $210,000) 26 (6) SR 0844 over Chartiers Creek, Canton 27 Township, Bridge Replacement 2,180,000 28 (Base Project Allocation - $1,850,000) 29 (Land Allocation - $80,000) 30 (Design and Contingencies - $250,000) 20080S1503B2474 - 350 -
1 (7) SR 4022 over Chartiers Creek, Canton 2 Township, Bridge Replacement 947,000 3 (Base Project Allocation - $787,000) 4 (Land Allocation - $8,000) 5 (Design and Contingencies - $152,000) 6 (8) SR 4035 over Georges Run, Canton 7 Township, Bridge Replacement 311,000 8 (Base Project Allocation - $225,000) 9 (Land Allocation - $8,000) 10 (Design and Contingencies - $78,000) 11 (9) SR 0837, Bridge No.34724 over 12 Tributary of Monongahela River, Carroll 13 Township, Bridge Replacement 780,000 14 (Base Project Allocation - $550,000) 15 (Land Allocation - $40,000) 16 (Design and Contingencies - $190,000) 17 (10) SR 1020, Bridge No.34825 over Branch 18 of Taylors Run, Carroll Township, 19 Bridge Replacement 735,000 20 (Base Project Allocation - $515,000) 21 (Land Allocation - $40,000) 22 (Design and Contingencies - $180,000) 23 (11) SR 1020, Bridge No.34827 over Branch 24 of Taylors Run, Carroll Township, 25 Bridge Replacement 760,000 26 (Base Project Allocation - $530,000) 27 (Land Allocation - $40,000) 28 (Design and Contingencies - $190,000) 29 (12) SR 2089 over Two Mile Run, 30 Centerville Borough, Bridge 20080S1503B2474 - 351 -
1 Replacement 755,000 2 (Base Project Allocation - $525,000) 3 (Land Allocation - $40,000) 4 (Design and Contingencies - $190,000) 5 (13) SR 1009 over Chartiers Creek, 6 Chartiers Township, Bridge Replacement 1,382,000 7 (Base Project Allocation - $1,186,000) 8 (Land Allocation - $8,000) 9 (Design and Contingencies - $188,000) 10 (14) SR 1045 over Branch of Chartiers 11 Creek, Chartiers Township, Bridge 12 Rehabilitation 1,045,000 13 (Base Project Allocation - $745,000) 14 (Land Allocation - $40,000) 15 (Design and Contingencies - $260,000) 16 (15) SR 4049 over Chartiers Creek, 17 Chartiers Township, Bridge Replacement 985,000 18 (Base Project Allocation - $750,000) 19 (Land Allocation - $35,000) 20 (Design and Contingencies - $200,000) 21 (16) SR 0837, Bridge No.34727 over 22 Tributary of Monongahela River, City of 23 Monongahela, Bridge Replacement 655,000 24 (Base Project Allocation - $455,000) 25 (Land Allocation - $40,000) 26 (Design and Contingencies - $160,000) 27 (17) SR 2063 over Fishpot Run, Deemston 28 Borough, Bridge Replacement 205,000 29 (Base Project Allocation - $145,000) 30 (Land Allocation - $8,000) 20080S1503B2474 - 352 -
1 (Design and Contingencies - $52,000) 2 (18) SR 0018 over Short Creek, East Finley 3 Township, Bridge Replacement 810,000 4 (Base Project Allocation - $570,000) 5 (Land Allocation - $40,000) 6 (Design and Contingencies - $200,000) 7 (19) SR 3017 over Branch of Sawhill Run, 8 East Finley Township, Bridge 9 Replacement 560,000 10 (Base Project Allocation - $380,000) 11 (Land Allocation - $40,000) 12 (Design and Contingencies - $140,000) 13 (20) SR 0481 over South Branch of Maple 14 Creek, Fallowfield Township, Bridge 15 Replacement 1,190,000 16 (Base Project Allocation - $850,000) 17 (Land Allocation - $40,000) 18 (Design and Contingencies - $300,000) 19 (21) SR 0331, Bridge No.34684 over Branch 20 of Brush Run, Hopewell Township, Bridge 21 Replacement 233,000 22 (Base Project Allocation - $167,000) 23 (Land Allocation - $8,000) 24 (Design and Contingencies - $58,000) 25 (22) SR 0331, Bridge No.34686 over Branch 26 of Brush Run, Hopewell Township, Bridge 27 Replacement 635,000 28 (Base Project Allocation - $435,000) 29 (Land Allocation - $40,000) 30 (Design and Contingencies - $160,000) 20080S1503B2474 - 353 -
1 (23) SR 0519 over Branch of Chartiers Run, 2 Houston Borough, Bridge Replacement 1,190,000 3 (Base Project Allocation - $850,000) 4 (Land Allocation - $40,000) 5 (Design and Contingencies - $300,000) 6 (24) SR 0331 over Welch Run, Independence 7 Township, Bridge Replacement 1,400,000 8 (Base Project Allocation - $1,000,000) 9 (Land Allocation - $50,000) 10 (Design and Contingencies - $350,000) 11 (25) SR 4012 over Robinson Run, Midway 12 Borough, Bridge Replacement 1,190,000 13 (Base Project Allocation - $850,000) 14 (Land Allocation - $40,000) 15 (Design and Contingencies - $300,000) 16 (26) SR 4039 over Millers Run, Mt. 17 Pleasant Township, Bridge Replacement 509,000 18 (Base Project Allocation - $381,000) 19 (Land Allocation - $8,000) 20 (Design and Contingencies - $120,000) 21 (27) SR 0019 over Chartiers Creek, North 22 Strabane Township, Bridge Replacement 1,160,000 23 (Base Project Allocation - $830,000) 24 (Land Allocation - $40,000) 25 (Design and Contingencies - $290,000) 26 (28) SR 1059 over Branch of Mingo Creek, 27 Nottingham Township, Bridge 28 Replacement 1,405,000 29 (Base Project Allocation - $1,000,000) 30 (Land Allocation - $55,000) 20080S1503B2474 - 354 -
1 (Design and Contingencies - $350,000) 2 (29) SR 1006 over Branch of Peters Creek, 3 Peters Township, Bridge Replacement 1,060,000 4 (Base Project Allocation - $750,000) 5 (Land Allocation - $40,000) 6 (Design and Contingencies - $270,000) 7 (30) SR 4001 over Saint Patrick Run, 8 Robinson Township, Bridge Replacement 770,000 9 (Base Project Allocation - $540,000) 10 (Land Allocation - $40,000) 11 (Design and Contingencies - $190,000) 12 (31) SR 4019 over Little Raccoon Creek, 13 Smith Township, Bridge Replacement 775,000 14 (Base Project Allocation - $545,000) 15 (Land Allocation - $40,000) 16 (Design and Contingencies - $190,000) 17 (32) SR 2027 over SR 0070, Speers Borough, 18 Bridge Replacement 1,055,000 19 (Base Project Allocation - $887,000) 20 (Land Allocation - $8,000) 21 (Design and Contingencies - $160,000) 22 (33) SR 0837, Bridge No.34733 over 23 Tributary of Monongahela River, Union 24 Township, Bridge Replacement 1,280,000 25 (Base Project Allocation - $920,000) 26 (Land Allocation - $40,000) 27 (Design and Contingencies - $320,000) 28 (34) SR 8042 over SR 0040, West 29 Brownsville Borough, Bridge 30 Replacement 769,000 20080S1503B2474 - 355 -
1 (Base Project Allocation - $625,000) 2 (Land Allocation - $8,000) 3 (Design and Contingencies - $136,000) 4 (35) SR 2041 over Pike Run, West Finley 5 Township, Bridge Replacement 1,200,000 6 (Base Project Allocation - $850,000) 7 (Land Allocation - $50,000) 8 (Design and Contingencies - $300,000) 9 (36) SR 3035 over Wheeling Creek, West 10 Finley Township, Bridge Replacement 537,000 11 (Base Project Allocation - $409,000) 12 (Land Allocation - $8,000) 13 (Design and Contingencies - $120,000) 14 (37) SR 2036 over Pike Run, West Pike Run 15 Township, Bridge Replacement 425,000 16 (Base Project Allocation - $307,000) 17 (Land Allocation - $8,000) 18 (Design and Contingencies - $110,000) 19 (38) SR 2038 over Little Pike Run, West 20 Pike Run Township, Bridge Replacement 730,000 21 (Base Project Allocation - $510,000) 22 (Land Allocation - $40,000) 23 (Design and Contingencies - $180,000) 24 (39) SR 1006 (Venetia Road) over Peters 25 Creek, Border of Union and Peters 26 Township, Bridge Replacement 2,000,000 27 (Base Project Allocation - $1,500,000) 28 (Land Allocation - $200,000) 29 (Design and Contingencies - $300,000) 30 (40) (RESERVED) <-- 20080S1503B2474 - 356 -
1 Section 68. Wayne County. 2 (a) Local Bridges 3 (1) Berlin Township, Adams Pond Road over 4 Lake Estermerwalt, Bridge Replacement 100,000 5 (Base Project Allocation - $100,000) 6 (2) Lebanon Township, Gridline Road over 7 Big Brook, Bridge Replacement 413,000 8 (Base Project Allocation - $344,000) 9 (Design and Contingencies - $69,000) 10 (3) Honesdale Borough, Sixth Pedestrian 11 Bridge over Lackawaxen River, Bridge 12 Replacement 180,000 13 (Base Project Allocation - $150,000) 14 (Design and Contingencies - $30,000) 15 (4) Dreher Township, Creamery Road over 16 Rockport Creek, Bridge Replacement 150,000 17 (Base Project Allocation - $150,000) 18 (b) State Bridges 19 (1) SR 0191 over Delaware River, 20 Buckingham Township, Bridge 21 Replacement 293,000 22 (Base Project Allocation - $282,000) 23 (Design and Contingencies - $11,000) 24 (2) SR 1002 over South Branch of Calkins 25 Creek, Damascus Township, Bridge 26 Rehabilitation 173,000 27 (Base Project Allocation - $119,000) 28 (Land Allocation - $12,000) 29 (Design and Contingencies - $42,000) 30 (3) SR 0191 over Manny Run, Dreher 20080S1503B2474 - 357 -
1 Township, Bridge Rehabilitation 38,000 2 (Base Project Allocation - $26,000) 3 (Land Allocation - $3,000) 4 (Design and Contingencies - $9,000) 5 (4) SR 4035 over East Lackawanna River, 6 Preston Township, Bridge 7 Rehabilitation 111,000 8 (Base Project Allocation - $76,000) 9 (Land Allocation - $8,000) 10 (Design and Contingencies - $27,000) 11 (5) SR 3004 over West Branch of 12 Wallenpaupack Creek, Salem Township, 13 Bridge Rehabilitation 320,000 14 (Base Project Allocation - $221,000) 15 (Land Allocation - $22,000) 16 (Design and Contingencies - $77,000) 17 (6) SR 4014 over Shadigee Creek, Starrucca 18 Borough, Bridge Rehabilitation 99,000 19 (Base Project Allocation - $68,000) 20 (Land Allocation - $7,000) 21 (Design and Contingencies - $24,000) 22 (7) SR 3002 over Butternut Creek, Sterling 23 Township, Bridge Rehabilitation 49,000 24 (Base Project Allocation - $33,000) 25 (Land Allocation - $4,000) 26 (Design and Contingencies - $12,000) 27 Section 69. Westmoreland County. 28 (a) Local Bridges 29 (1) Allegheny Township, T-997 Copeland 30 Road over Chartiers Run, Bridge 20080S1503B2474 - 358 -
1 Replacement 864,000 2 (Base Project Allocation - $644,000) 3 (Land Allocation - $20,000) 4 (Design and Contingencies - $200,000) 5 (b) State Bridges 6 (1) SR 0356 over Pine Run, Allegheny 7 Township, Bridge Replacement 395,000 8 (Base Project Allocation - $304,000) 9 (Land Allocation - $8,000) 10 (Design and Contingencies - $83,000) 11 (2) SR 4034 over Pine Run, Allegheny 12 Township, Bridge Replacement 2,925,000 13 (Base Project Allocation - $2,500,000) 14 (Land Allocation - $75,000) 15 (Design and Contingencies - $350,000) 16 (3) SR 0286 over Branch of Wolford Run, 17 Bell Township, Bridge Replacement 805,000 18 (Base Project Allocation - $565,000) 19 (Land Allocation - $40,000) 20 (Design and Contingencies - $200,000) 21 (4) SR 1060, Kiskiminetas, CONRAIL 22 Railroad, Bell Township, Bridge 23 Replacement 3,620,000 24 (Base Project Allocation - $3,040,000) 25 (Land Allocation - $80,000) 26 (Design and Contingencies - $500,000) 27 (5) SR 0136 over SR 0030 and Zellers Run, 28 City of Greensburg, Bridge Restoration 1,750,000 29 (Base Project Allocation - $1,750,000) 30 (6) SR 4009 over Branch of Brush Creek, 20080S1503B2474 - 359 -
1 City of Jeannette, Bridge Replacement 1,005,000 2 (Base Project Allocation - $715,000) 3 (Land Allocation - $40,000) 4 (Design and Contingencies - $250,000) 5 (7) SR 3003 over Branch of Speers Run, 6 City of Monessen, Bridge Replacement 1,225,000 7 (Base Project Allocation - $850,000) 8 (Land Allocation - $75,000) 9 (Design and Contingencies - $300,000) 10 (8) SR 0366 over SR 0056, City of New 11 Kensington, Bridge Rehabilitation 1,187,000 12 (Base Project Allocation - $1,009,000) 13 (Land Allocation - $8,000) 14 (Design and Contingencies - $170,000) 15 (9) SR 0381 over Powdermill Run, Cook 16 Township, Bridge Replacement 1,225,000 17 (Base Project Allocation - $750,000) 18 (Land Allocation - $75,000) 19 (Design and Contingencies - $400,000) 20 (10) SR 0217 over CONRAIL Railroad, Derry 21 Borough, Bridge Replacement 2,220,000 22 (Base Project Allocation - $1,800,000) 23 (Land Allocation - $40,000) 24 (Design and Contingencies - $380,000) 25 (11) SR 0982 over Branch of Stony Run, 26 Derry Township, Bridge Replacement 1,225,000 27 (Base Project Allocation - $750,000) 28 (Land Allocation - $75,000) 29 (Design and Contingencies - $400,000) 30 (12) SR 1018 over Keystone Lake, Derry 20080S1503B2474 - 360 -
1 Township, Bridge Replacement 1,400,000 2 (Base Project Allocation - $1,200,000) 3 (Design and Contingencies - $200,000) 4 (13) SR 0381 over Indian Creek, Donegal 5 Township, Bridge Rehabilitation 2,500,000 6 (Base Project Allocation - $2,000,000) 7 (Land Allocation - $100,000) 8 (Design and Contingencies - $400,000) 9 (14) SR 0381 over Camp Run, Donegal 10 Township, Bridge Replacement 1,225,000 11 (Base Project Allocation - $750,000) 12 (Land Allocation - $75,000) 13 (Design and Contingencies - $400,000) 14 (15) SR 0119 over Jacobs Creek, Railroad, 15 East Huntington Township, Bridge 16 Rehabilitation 1,500,000 17 (Base Project Allocation - $1,500,000) 18 (16) SR 3073 over Branch of Meadow Run, 19 East Huntington Township, Bridge 20 Replacement 805,000 21 (Base Project Allocation - $565,000) 22 (Land Allocation - $40,000) 23 (Design and Contingencies - $200,000) 24 (17) SR 3089 over Buffalo Run, East 25 Huntington Township, Bridge 26 Replacement 640,000 27 (Base Project Allocation - $445,000) 28 (Land Allocation - $40,000) 29 (Design and Contingencies - $155,000) 30 (18) SR 0271 over Tubmill Run, Fairfield 20080S1503B2474 - 361 -
1 Township, Bridge Replacement 1,025,000 2 (Base Project Allocation - $730,000) 3 (Land Allocation - $40,000) 4 (Design and Contingencies - $255,000) 5 (19) SR 1017 over Branch of Hannas Run, 6 Fairfield Township, Bridge Replacement 770,000 7 (Base Project Allocation - $540,000) 8 (Land Allocation - $40,000) 9 (Design and Contingencies - $190,000) 10 (20) SR 0136, Bridge No.36129 over Branch 11 of Little Sewickley Creek, Hempfield 12 Township, Bridge Replacement 1,175,000 13 (Base Project Allocation - $650,000) 14 (Land Allocation - $75,000) 15 (Design and Contingencies - $450,000) 16 (21) SR 0136, Bridge No.36131 over Branch 17 of Little Sewickley Creek, Hempfield 18 Township, Bridge Replacement 580,000 19 (Base Project Allocation - $400,000) 20 (Land Allocation - $40,000) 21 (Design and Contingencies - $140,000) 22 (22) SR 4010 over Branch of Brush Creek, 23 Hempfield Township, Bridge Replacement 252,000 24 (Base Project Allocation - $180,000) 25 (Land Allocation - $8,000) 26 (Design and Contingencies - $64,000) 27 (23) SR 4012 over Brush Creek, Hempfield 28 Township, Bridge Replacement 448,000 29 (Base Project Allocation - $324,000) 30 (Land Allocation - $8,000) 20080S1503B2474 - 362 -
1 (Design and Contingencies - $116,000) 2 (24) SR 0981 over Loyalhanna Creek, 3 Latrobe Borough, Bridge Replacement 1,010,000 4 (Base Project Allocation - $780,000) 5 (Land Allocation - $110,000) 6 (Design and Contingencies - $120,000) 7 (25) SR 0031 over Branch of Jacobs Creek, 8 Mt. Pleasant Township, Bridge 9 Replacement 1,275,000 10 (Base Project Allocation - $900,000) 11 (Land Allocation - $75,000) 12 (Design and Contingencies - $300,000) 13 (26) SR 0982 over Welty Run, Mt. Pleasant 14 Township, Bridge Replacement 2,100,000 15 (Base Project Allocation - $1,750,000) 16 (Land Allocation - $100,000) 17 (Design and Contingencies - $250,000) 18 (27) SR 2012 over Branch of Sewickley 19 Creek, Mt. Pleasant Township, Bridge 20 Replacement 710,000 21 (Base Project Allocation - $495,000) 22 (Land Allocation - $40,000) 23 (Design and Contingencies - $175,000) 24 (28) SR 0981 over Repko Run, New 25 Alexandria Borough, Bridge Replacement 657,000 26 (Base Project Allocation - $545,000) 27 (Land Allocation - $8,000) 28 (Design and Contingencies - $104,000) 29 (29) SR 0993 over Brush Creek, North 30 Huntingdon Township, Bridge 20080S1503B2474 - 363 -
1 Replacement 629,000 2 (Base Project Allocation - $519,000) 3 (Land Allocation - $8,000) 4 (Design and Contingencies - $102,000) 5 (30) SR 3024 over Branch of Long Run, 6 North Huntingdon Township, Bridge 7 Replacement 218,000 8 (Base Project Allocation - $156,000) 9 (Land Allocation - $8,000) 10 (Design and Contingencies - $54,000) 11 (31) SR 3049 over Possum Hollow Run, North 12 Huntingdon Township, Bridge 13 Replacement 705,000 14 (Base Project Allocation - $495,000) 15 (Land Allocation - $40,000) 16 (Design and Contingencies - $170,000) 17 (32) SR 4022 over Branch of Brush Run, 18 Penn Borough, Bridge Replacement 313,000 19 (Base Project Allocation - $225,000) 20 (Land Allocation - $8,000) 21 (Design and Contingencies - $80,000) 22 (33) SR 4022 over Brush Run, Penn 23 Township, Bridge Replacement 640,000 24 (Base Project Allocation - $445,000) 25 (Land Allocation - $40,000) 26 (Design and Contingencies - $155,000) 27 (34) SR 3015, Bridge No.36556 over 28 Tributary of Monongahela River, 29 Rostraver Township, Bridge Replacement 685,000 30 (Base Project Allocation - $475,000) 20080S1503B2474 - 364 -
1 (Land Allocation - $40,000) 2 (Design and Contingencies - $170,000) 3 (35) SR 3015, Bridge No.36557 over 4 Tributary of Monongahela River, 5 Rostraver Township, Bridge Replacement 535,000 6 (Base Project Allocation - $365,000) 7 (Land Allocation - $40,000) 8 (Design and Contingencies - $130,000) 9 (36) SR 3017 over Branch of Cedar Creek, 10 Rostraver Township, Bridge Replacement 775,000 11 (Base Project Allocation - $545,000) 12 (Land Allocation - $40,000) 13 (Design and Contingencies - $190,000) 14 (37) SR 0819 over Branch of Jacks Run, 15 Salem Township, Bridge Replacement 935,000 16 (Base Project Allocation - $665,000) 17 (Land Allocation - $40,000) 18 (Design and Contingencies - $230,000) 19 (38) SR 1022 over Crabtree Creek, Salem 20 Township, Bridge Replacement 567,000 21 (Base Project Allocation - $439,000) 22 (Land Allocation - $8,000) 23 (Design and Contingencies - $120,000) 24 (39) SR 3016 over Little Sewickley Creek, 25 Sewickley Township, Bridge Replacement 693,000 26 (Base Project Allocation - $555,000) 27 (Land Allocation - $8,000) 28 (Design and Contingencies - $130,000) 29 (40) SR 3016 over Branch of Sewickley 30 Creek, Sewickley Township, Bridge 20080S1503B2474 - 365 -
1 Replacement 580,000 2 (Base Project Allocation - $400,000) 3 (Land Allocation - $40,000) 4 (Design and Contingencies - $140,000) 5 (41) SR 2014 over Slate Creek, South 6 Greensburg Borough, Bridge Replacement 313,000 7 (Base Project Allocation - $225,000) 8 (Land Allocation - $8,000) 9 (Design and Contingencies - $80,000) 10 (42) SR 0031 over Painters Run, South 11 Huntingdon Township, Bridge 12 Replacement 780,000 13 (Base Project Allocation - $550,000) 14 (Land Allocation - $40,000) 15 (Design and Contingencies - $190,000) 16 (43) SR 3031 over Smithton Run, South 17 Huntingdon Township, Bridge 18 Replacement 830,000 19 (Base Project Allocation - $585,000) 20 (Land Allocation - $40,000) 21 (Design and Contingencies - $205,000) 22 (44) SR 0119 over Zellers Run, Southwest 23 Greensburg Borough, Bridge Replacement 1,740,000 24 (Base Project Allocation - $1,250,000) 25 (Land Allocation - $40,000) 26 (Design and Contingencies - $450,000) 27 (45) SR 3103 over SR 0030 and Zellers Run, 28 Southwest Greensburg Borough, Bridge 29 Restoration 1,750,000 30 (Base Project Allocation - $1,750,000) 20080S1503B2474 - 366 -
1 (46) SR 0981 over Monastery Run, Unity 2 Township, Bridge Replacement 674,000 3 (Base Project Allocation - $538,000) 4 (Land Allocation - $8,000) 5 (Design and Contingencies - $128,000) 6 (47) SR 0982, Bridge No.36330 over 7 Ninemile Run, Unity Township, Bridge 8 Replacement 1,425,000 9 (Base Project Allocation - $1,000,000) 10 (Land Allocation - $75,000) 11 (Design and Contingencies - $350,000) 12 (48) SR 0982, Bridge No.36332 over 13 Ninemile Run, Unity Township, Bridge 14 Replacement 563,000 15 (Base Project Allocation - $435,000) 16 (Land Allocation - $8,000) 17 (Design and Contingencies - $120,000) 18 (49) SR 1022 over Tributary of Loyalhanna 19 Creek, Unity Township, Bridge 20 Replacement 720,000 21 (Base Project Allocation - $500,000) 22 (Land Allocation - $40,000) 23 (Design and Contingencies - $180,000) 24 (50) SR 2017 over Branch of Sewickley 25 Creek, Unity Township, Bridge 26 Replacement 920,000 27 (Base Project Allocation - $650,000) 28 (Land Allocation - $40,000) 29 (Design and Contingencies - $230,000) 30 (51) SR 2023 over Branch of Sewickley 20080S1503B2474 - 367 -
1 Creek, Unity Township, Bridge 2 Replacement 775,000 3 (Base Project Allocation - $545,000) 4 (Land Allocation - $40,000) 5 (Design and Contingencies - $190,000) 6 (52) SR 2027 over Branch of Ninemile Run, 7 Unity Township, Bridge Replacement 2,500,000 8 (Base Project Allocation - $2,100,000) 9 (Land Allocation - $50,000) 10 (Design and Contingencies - $350,000) 11 (53) SR 0366 over Pucketa Creek, Upper 12 Burrell Township, Bridge Replacement 350,000 13 (Base Project Allocation - $350,000) 14 (54) SR 4067 over Branch of Pine Run, 15 Washington Township, Bridge 16 Replacement 580,000 17 (Base Project Allocation - $400,000) 18 (Land Allocation - $40,000) 19 (Design and Contingencies - $140,000) 20 (55) SR 0136 over Youghiogheny River, West 21 Newton Borough, Bridge Replacement 3,080,000 22 (Base Project Allocation - $2,600,000) 23 (Land Allocation - $80,000) 24 (Design and Contingencies - $400,000) 25 Section 70. Wyoming County. 26 (a) Local Bridges 27 (1) Eaton Township, T-391, Jenks Road over 28 March Creek, Bridge Rehabilitation 77,000 29 (Base Project Allocation - $70,000) 30 (Design and Contingencies - $7,000) 20080S1503B2474 - 368 -
1 (2) Monroe Township, T-337 over Leonard 2 Creek, Bridge Replacement 925,000 3 (Base Project Allocation - $760,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $115,000) 6 (3) Tunkhannock Borough, Avery Street over 7 Unnamed Tributary of Swale Brook, 8 Bridge Rehabilitation 50,000 9 (Base Project Allocation - $38,000) 10 (Design and Contingencies - $12,000) 11 (4) Tunkhannock Borough, North Bridge 12 Street No.1 over Unnamed Tributary of 13 Swale Brook, Bridge Rehabilitation 45,000 14 (Base Project Allocation - $30,000) 15 (Land Allocation - $2,000) 16 (Design and Contingencies - $13,000) 17 (5) Tunkhannock Borough, North Bridge 18 Street No.2 over Unnamed Tributary of 19 Swale Brook, Bridge Replacement 150,000 20 (Base Project Allocation - $110,000) 21 (Land Allocation - $5,000) 22 (Design and Contingencies - $35,000) 23 (6) Tunkhannock Borough, East Harrison 24 Street over Swale Brook, Bridge 25 Replacement 125,000 26 (Base Project Allocation - $90,000) 27 (Land Allocation - $5,000) 28 (Design and Contingencies - $30,000) 29 (7) Tunkhannock Borough, McCord Street, 30 over Swale Brook, Bridge 20080S1503B2474 - 369 -
1 Rehabilitation 33,000 2 (Base Project Allocation - $25,000) 3 (Design and Contingencies - $8,000) 4 (b) State Bridges 5 (1) SR 2007 over Tributary of Susquehanna 6 River, Eaton Township, Bridge 7 Rehabilitation 360,000 8 (Base Project Allocation - $248,000) 9 (Land Allocation - $25,000) 10 (Design and Contingencies - $87,000) 11 (2) SR 2007 over Penny Creek, Eaton 12 Township, Bridge Rehabilitation 84,000 13 (Base Project Allocation - $58,000) 14 (Land Allocation - $6,000) 15 (Design and Contingencies - $20,000) 16 (3) SR 0087 over Little Mehoopany Creek, 17 Mehoopany Township, Bridge 18 Rehabilitation 36,000 19 (Base Project Allocation - $24,000) 20 (Land Allocation - $3,000) 21 (Design and Contingencies - $9,000) 22 (4) SR 4002 over Little Mehoopany Creek, 23 Mehoopany Township, Bridge Replacement 1,415,000 24 (Base Project Allocation - $1,100,000) 25 (Land Allocation - $90,000) 26 (Design and Contingencies - $225,000) 27 (5) SR 4005 over Tributary of Mehoopany 28 Creek, Mehoopany Township, Bridge 29 Replacement 960,000 30 (Base Project Allocation - $800,000) 20080S1503B2474 - 370 -
1 (Land Allocation - $60,000) 2 (Design and Contingencies - $100,000) 3 (6) SR 0006, TR 6 over Meshoppen Creek, 4 Meshoppen Borough, Bridge 5 Rehabilitation 1,166,000 6 (Base Project Allocation - $866,000) 7 (Design and Contingencies - $300,000) 8 (7) SR 0029 over Roaring Run Creek, Monroe 9 Township, Bridge Rehabilitation 122,000 10 (Base Project Allocation - $84,000) 11 (Land Allocation - $9,000) 12 (Design and Contingencies - $29,000) 13 (8) SR 0092, TR 92 over Tributary of 14 Tunkhannock Creek, Nicholson Township, 15 Bridge Rehabilitation 400,000 16 (Base Project Allocation - $200,000) 17 (Design and Contingencies - $200,000) 18 (9) SR 1027 over Willow Brook, Nicholson 19 Township, Bridge Rehabilitation 64,000 20 (Base Project Allocation - $44,000) 21 (Land Allocation - $5,000) 22 (Design and Contingencies - $15,000) 23 Section 71. York County. 24 (a) Local Bridges 25 (1) Franklin Township, Ridge Road over 26 North Branch of Bermudian Creek, Bridge 27 Replacement 66,000 28 (Base Project Allocation - $66,000) 29 (2) Hellam Township, Cool Springs Road 30 over SR 0030, Bridge Rehabilitation 2,376,000 20080S1503B2474 - 371 -
1 (Base Project Allocation - $2,376,000) 2 (3) FRANKLIN TOWNSHIP, RIDGE ROAD OVER <-- 3 NORTH BRANCH BERMUDIAN CREEK, BRIDGE 4 REPLACEMENT 66,000 5 (BASE PROJECT ALLOCATION - $66,000) 6 (4) MANHEIM TOWNSHIP, WOLFGANG SCHOOL ROAD 7 OVER EAST BRANCH OF CODORUS CREEK, 8 BRIDGE REPLACEMENT 542,000 9 (BASE PROJECT ALLOCATION - $433,000) 10 (LAND ALLOCATION - $17,000) 11 (DESIGN AND CONTINGENCIES - $92,000) 12 (5) CITY OF YORK, WEST MARKET STREET, SR 13 0462 OVER CODORUS CREEK, BRIDGE 14 REHABILITATION 354,000 15 (BASE PROJECT ALLOCATION - $354,000) 16 (b) State Bridges 17 (1) SR 0216 over Pierceville Run, Codorus 18 Township, Bridge Replacement 420,000 19 (Base Project Allocation - $300,000) 20 (Land Allocation - $20,000) 21 (Design and Contingencies - $100,000) 22 (2) SR 3053 over Mill Race, Heidelberg 23 Township, Bridge Replacement 420,000 24 (Base Project Allocation - $300,000) 25 (Land Allocation - $20,000) 26 (Design and Contingencies - $100,000) 27 (3) SR 0030, Lincoln Highway over Paradise 28 Creek, Jackson Township, Bridge 29 Replacement 420,000 30 (Base Project Allocation - $300,000) 20080S1503B2474 - 372 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $100,000) 3 (4) SR 0030, Lincoln Highway over Little 4 Conewago Creek, Jackson Township, 5 Bridge Replacement 420,000 6 (Base Project Allocation - $300,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $100,000) 9 (5) SR 3058 over Gunpowder Falls Creek, 10 Manheim Township, Bridge Replacement 97,000 11 (Base Project Allocation - $97,000) 12 (6) SR 3074 over Tributary of Codorus 13 Creek, Manheim Township, Bridge 14 Replacement 1,164,000 15 (Base Project Allocation - $650,000) 16 (Land Allocation - $70,000) 17 (Design and Contingencies - $444,000) 18 (7) SR 4009, York Road over Bennett Run, 19 Newberry Township, Bridge 20 Rehabilitation 1,000,000 21 (Base Project Allocation - $420,000) 22 (Design and Contingencies - $580,000) 23 (8) SR 3017, Reynolds Mill over East 24 Branch of Codorus Creek, North Codorus 25 Township, Bridge Rehabilitation 3,440,000 26 (Base Project Allocation - $1,640,000) 27 (Design and Contingencies - $1,800,000) 28 (9) SR 3044 over West Branch of Codorus 29 Creek, North Codorus Township, Bridge 30 Rehabilitation 3,090,000 20080S1503B2474 - 373 -
1 (Base Project Allocation - $1,440,000) 2 (Design and Contingencies - $1,650,000) 3 (10) SR 3053 over West Branch of Codorus 4 Creek, North Codorus Township, Bridge 5 Replacement 420,000 6 (Base Project Allocation - $300,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $100,000) 9 (11) SR 3046, West College Avenue, over 10 West Branch of Codorus Creek, North 11 Codorus Township, Bridge 12 Rehabilitation 2,350,000 13 (Base Project Allocation - $1,070,000) 14 (Design and Contingencies - $1,280,000) 15 (12) SR 3073 over Tributary of Plum Creek, 16 Penn Township, Bridge Replacement 97,000 17 (Base Project Allocation - $97,000) 18 (13) I-83 over York Railroad and Codorus 19 Creek, Spring Garden Township, Bridge 20 Rehabilitation 1,200,000 21 (Base Project Allocation - $810,000) 22 (Land Allocation - $20,000) 23 (Design and Contingencies - $370,000) 24 (14) SR 2017 over Tributary of Cabin 25 Creek, Springettsbury Township, Bridge 26 Replacement 222,000 27 (Land Allocation - $25,000) 28 (Design and Contingencies - $197,000) 29 (15) SR 2017 over Kreutz Creek, 30 Springettsbury Township, Bridge 20080S1503B2474 - 374 -
1 Replacement 222,000 2 (Land Allocation - $25,000) 3 (Design and Contingencies - $197,000) 4 (16) I-83 over SR 2068, Springfield 5 Township, Bridge Rehabilitation 295,000 6 (Base Project Allocation - $110,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $165,000) 9 (17) I-83 over PA 214 and SR 0214, 10 Springfield Township, Bridge 11 Rehabilitation 147,000 12 (Base Project Allocation - $55,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $82,000) 15 (18) SR 3100, North Street over I-83, 16 Springfield Township, Bridge 17 Rehabilitation 420,000 18 (Base Project Allocation - $300,000) 19 (Land Allocation - $20,000) 20 (Design and Contingencies - $100,000) 21 (19) SR 0182 over Tributary of South 22 Branch of Codorus Creek, Springfield 23 Township, Bridge Replacement 420,000 24 (Base Project Allocation - $300,000) 25 (Land Allocation - $20,000) 26 (Design and Contingencies - $100,000) 27 (20) SR 3020 over Tributary of South 28 Branch of Codorus Creek, Springfield 29 Township, Bridge Replacement 97,000 30 (Base Project Allocation - $97,000) 20080S1503B2474 - 375 -
1 (21) SR 0194, Baltimore Road over Reynolds 2 Run, Washington Township, Bridge 3 Replacement 750,000 4 (Base Project Allocation - $750,000) 5 (22) SR 4008, Davidsburg Road over Red 6 Run, Washington Township, Bridge 7 Rehabilitation 500,000 8 (Base Project Allocation - $500,000) 9 (23) SR 4012, Wellsville Road over Doe 10 Run, Washington Township, Bridge 11 Replacement 420,000 12 (Base Project Allocation - $300,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $100,000) 15 (24) SR 0462, West Market Street over 16 Tributary of Codorus Creek, West 17 Manchester Township, Bridge 18 Replacement 420,000 19 (Base Project Allocation - $300,000) 20 (Land Allocation - $20,000) 21 (Design and Contingencies - $100,000) 22 (25) SR 3046, Highland Avenue over York 23 Railroad, West York Borough, Bridge 24 Rehabilitation 2,000,000 25 (Base Project Allocation - $2,000,000) 26 (26) SR 1015 over Tributary of Susquehanna 27 River, York Haven Borough, Bridge 28 Replacement 97,000 29 (Base Project Allocation - $97,000) 30 (27) I-83 over Lake Redmans Creek, York 20080S1503B2474 - 376 -
1 Township, Bridge Rehabilitation 147,000
2 (Base Project Allocation - $55,000)
3 (Land Allocation - $10,000)
4 (Design and Contingencies - $82,000)
5 Section 72. Miscellaneous.
6 (1) DCNR Bridges over Various Spans,
7 Various Townships, Bridge Replacement 5,000,000
8 (Design and Contingencies - $5,000,000)
9 Section 73. Limitation on expenditure of funds.
10 The following shall apply:
11 (1) Any moneys derived from the incurring of debt shall
12 be used solely for effecting the rehabilitation, replacement
13 or removal of bridges located on State highways. All other
14 bridge rehabilitation, replacement or removal shall be
15 financed from current revenue.
16 (2) Notwithstanding any law to the contrary, the
17 projects itemized in the act of December 8, 1982 (P.L.848,
18 No.235), known as the Highway-Railroad and Highway Bridge
19 Capital Budget Act for 1982-1983, may be financed from
20 current revenue.
21 Section 74. Debt authorization.
22 The Governor, Auditor General and State Treasurer are hereby
23 authorized and directed to borrow from time to time, in addition
24 to any authorization heretofore or hereafter enacted, on the
25 credit of the Commonwealth, subject to the limitations provided
26 in the current capital budget, money not exceeding in the
27 aggregate the sum of $1,150,048,000 $1,523,916,000 <--
28 $1,538,916,000 as may be found necessary to carry out the <--
29 acquisition and construction of the State projects specifically
30 itemized in this act.
20080S1503B2474 - 377 -
1 Section 75. Issue of bonds. 2 The indebtedness authorized in this act shall be incurred 3 from time to time and shall be evidenced by one or more series 4 of general obligation bonds of the Commonwealth in such 5 aggregate principal amount for each series as the Governor, 6 Auditor General and State Treasurer shall determine, but the 7 latest stated maturity date shall not exceed 30 years from the 8 date of the bond first issued for each series. 9 Section 76. Estimated useful life of projects. 10 The General Assembly states the estimated useful life of the 11 projects itemized in this act as 30 years. 12 Section 77. Appropriation. 13 The net proceeds of the sale of the obligations authorized in 14 this act are hereby appropriated from the Capital Facilities 15 Fund to the department in the maximum amount of $1,150,048,000 <-- 16 $1,523,916,000 $1,538,916,000 to be used by it exclusively to <-- 17 defray the financial costs of the State projects specifically 18 itemized in this capital budget. After reserving or paying the 19 expenses of the sale of the obligation, the State Treasurer 20 shall pay out to the department the moneys as required and 21 certified by it to be legally due and payable. 22 Section 78. Federal funds. 23 In addition to those funds appropriated in section 77, all 24 moneys received from the Federal Government for the public 25 improvement projects specifically itemized in this act are also 26 hereby appropriated for those projects. 27 Section 79. Allocation of funds. 28 (a) General rule.--Whenever the department or the Department 29 of Conservation and Natural Resources determines that the full 30 estimated financial costs of the projects itemized in this act 20080S1503B2474 - 378 -
1 are not necessary for the proper design, acquisition or 2 construction of such projects, the excess funds no longer 3 required may be allocated by the department or the Department of 4 Conservation and Natural Resources to increase the estimated 5 costs of any one or more of the projects specifically itemized 6 in a capital budget. 7 (b) Reimbursement of municipal expenditures.--Moneys raised 8 or expended by municipalities after the effective date of this 9 act, in anticipation of receipt of funds authorized for projects 10 itemized by this act, may be reimbursable to those 11 municipalities. 12 Section 80. Policy on jobs and materials. 13 (a) Jobs.--It is the declared policy of the Commonwealth 14 that the construction projects authorized in this act be used, 15 to the greatest extent possible, to provide for the creation of 16 jobs and the rehiring of the unemployed in this Commonwealth. In 17 order to reach this goal, firms with Commonwealth-based 18 facilities shall be actively solicited to make bids on contracts 19 to furnish products and materials, including, but not limited 20 to, steel and steel products, to be used in these projects. 21 (b) Materials.--Every contract document entered into to 22 undertake a project contained in this act shall provide that any 23 steel or other products to be used or supplied in the 24 performance of this contract shall be required to be 25 manufactured by plants in the United States unless the secretary 26 determines, on a contract by contract basis, that certain 27 required products are not produced in the United States in 28 sufficient quantities to meet the requirements of the contract. 29 Such a determination and the reasons therefor shall be published 30 in the Pennsylvania Bulletin. Decisions made under this 20080S1503B2474 - 379 -
1 subsection shall not be inconsistent with the general provisions 2 of the act of March 3, 1978 (P.L.6, No.3), known as the Steel 3 Products Procurement Act. 4 (c) Minorities and women.--It is also the declared policy of 5 the Commonwealth to require and encourage substantial 6 participation by minorities and women in the construction 7 projects authorized by this act. 8 Section 81. Payment of capital debt service. 9 The repayment of any debt incurred pursuant to this act shall 10 be made from the account and such repayment shall have first 11 claim on the revenues of the account. 12 Section 82. Authorization and debt cumulation. 13 The additional authorization and debt allowance provided for 14 in this act shall be added to the total authorizations and debt 15 incurred pursuant to the act of December 8, 1982 (P.L.848, 16 No.235), known as the Highway-Railroad and Highway Bridge 17 Capital Budget Act for 1982-1983, as amended and supplemented. 18 Section 83. Editorial changes. 19 In editing and preparing this act for printing following the 20 final enactment, the Legislative Reference Bureau shall insert 21 or revise letters or numbers for projects where the letters or 22 numbers are missing or require revision. The bureau shall also 23 revise the total monetary amounts for the total authorization, 24 debt authorization, appropriations and departmental totals as 25 necessary to agree with the total monetary amounts of the 26 projects. 27 Section 84. Effective date. 28 This act shall take effect immediately. F13L86RLE/20080S1503B2474 - 380 -