PRIOR PRINTER'S NO. 2218 PRINTER'S NO. 2376
No. 1503 Session of 2008
INTRODUCED BY MADIGAN AND STOUT, JUNE 19, 2008
SENATOR ARMSTRONG, APPROPRIATIONS, RE-REPORTED AS AMENDED, SEPTEMBER 17, 2008
AN ACT A SUPPLEMENT <-- 1 To the act of December 8, 1982 (P.L.848, No.235), entitled "An <-- 2 act providing for the adoption of capital projects related to 3 the repair, rehabilitation or replacement of highway bridges 4 to be financed from current revenue or by the incurring of 5 debt and capital projects related to highway and safety 6 improvement projects to be financed from current revenue of 7 the Motor License Fund," itemizing additional local and State 8 bridge projects. 9 TO THE ACT OF DECEMBER 8, 1982 (P.L.848, NO.235), ENTITLED "AN <-- 10 ACT PROVIDING FOR THE ADOPTION OF CAPITAL PROJECTS RELATED TO 11 THE REPAIR, REHABILITATION OR REPLACEMENT OF HIGHWAY BRIDGES 12 TO BE FINANCED FROM CURRENT REVENUE OR BY THE INCURRING OF 13 DEBT AND CAPITAL PROJECTS RELATED TO HIGHWAY AND SAFETY 14 IMPROVEMENT PROJECTS TO BE FINANCED FROM CURRENT REVENUE OF 15 THE MOTOR LICENSE FUND," ITEMIZING ADDITIONAL STATE AND LOCAL 16 BRIDGE PROJECTS. 17 The General Assembly of the Commonwealth of Pennsylvania 18 hereby enacts as follows: 19 Section 1. Short title. <-- 20 This act shall be known and may be cited as the Highway- 21 Railroad and Highway Bridge Capital Budget Supplemental Act for 22 2005-2006. 23 Section 2. Definitions. 24 The following words and phrases when used in this act shall
1 have the meanings given to them in this section unless the 2 context clearly indicates otherwise: 3 "Account." The Highway Bridge Improvement Restricted Account 4 within the Motor License Fund. 5 "Capital project." A capital project as defined in section 6 302 of the act of February 9, 1999 (P.L.1, No.1), known as the 7 Capital Facilities Debt Enabling Act, and shall include a county 8 or municipal bridge rehabilitation, replacement or improvement 9 project as set forth in this act. 10 "Department." The Department of Transportation of the 11 Commonwealth. 12 "Secretary." The Secretary of Transportation of the 13 Commonwealth. 14 Section 3. Total authorization for bridge projects. 15 (a) Total projects.--The total authorization for the costs 16 of the projects itemized pursuant to this act and to be financed 17 from current revenue or by the incurring of debt shall be 18 $000,000. 19 (b) State projects.--The authorization for capital projects 20 in the category of highway bridge projects and forestry and 21 State park bridge projects to be constructed by the Department 22 of Transportation, its successors or assigns, and to be financed 23 by the incurring of debt or from the account, itemized in this 24 act under the category of State bridges, shall be $000,000,000. 25 (c) Non-State projects.--The authorization for non-State 26 highway bridge projects to be constructed by municipalities and 27 to be financed in part with grants not exceeding 80% of the non- 28 Federal share of the costs made to the local government 29 municipalities by the department from revenues deposited in the 30 account itemized in this act under the category of local 20080S1503B2376 - 2 -
1 bridges, shall be $000,000. 2 Section 4. Itemization of bridge projects. 3 The individual capital projects in the category of highway 4 projects to be constructed by the Department of Transportation, 5 its successors or assigns, and to be financed from current 6 revenue or by the incurring of debt are hereby itemized, 7 together with their estimated financial costs, in the following 8 sections. 9 Section 5. Adams County. 10 (a) Local Bridges (Reserved) 11 (b) State Bridges (Reserved) 12 Section 6. Allegheny County. 13 (a) Local Bridges (Reserved) 14 (b) State Bridges (Reserved) 15 Section 7. Armstrong County. 16 (a) Local Bridges (Reserved) 17 (b) State Bridges (Reserved) 18 Section 8. Beaver County. 19 (a) Local Bridges (Reserved) 20 (b) State Bridges (Reserved) 21 Section 9. Bedford County. 22 (a) Local Bridges (Reserved) 23 (b) State Bridges 24 Projects are as follows: 25 (1) SR 1007, over US 30, West Providence 26 Township, Bridge Restoration 5,450,000 27 (Base Project Allocation - $5,300,000) 28 (Design and Contingencies - $150,000) 29 Section 10. Berks County. 30 (a) Local Bridges (Reserved) 20080S1503B2376 - 3 -
1 (b) State Bridges 2 Projects are as follows: 3 (1) SR 3008, LR 6056, over Spring Creek, 4 North Heidelberg Township, Bridge 5 Rehabilitation 1,184,000 6 (Base Project Allocation - $1,184,000) 7 Section 11. Blair County. 8 (a) Local Bridges (Reserved) 9 (b) State Bridges (Reserved) 10 Section 12. Bradford County. 11 (a) Local Bridges (Reserved) 12 (b) State Bridges (Reserved) 13 Section 13. Bucks County. 14 (a) Local Bridges (Reserved) 15 (b) State Bridges (Reserved) 16 Section 14. Butler County. 17 (a) Local Bridges (Reserved) 18 (b) State Bridges (Reserved) 19 Section 15. Cambria County. 20 (a) Local Bridges (Reserved) 21 (b) State Bridges (Reserved) 22 Section 16. Cameron County. 23 (a) Local Bridges (Reserved) 24 (b) State Bridges (Reserved) 25 Section 17. Carbon County. 26 (a) Local Bridges (Reserved) 27 (b) State Bridges (Reserved) 28 Section 18. Centre County. 29 (a) Local Bridges (Reserved) 30 (b) State Bridges 20080S1503B2376 - 4 -
1 Projects are as follows: 2 (1) SR 0045, over Spruce Creek, Ferguson 3 Township, Bridge Replacement 320,000 4 (Base Project Allocation - $200,000) 5 (Land Allocation - $60,000) 6 (Design and Contingencies - $60,000) 7 Section 19. Chester County. 8 (a) Local Bridges (Reserved) 9 (b) State Bridges (Reserved) 10 Section 20. Clarion County. 11 (a) Local Bridges (Reserved) 12 (b) State Bridges (Reserved) 13 Section 21. Clearfield County. 14 (a) Local Bridges (Reserved) 15 (b) State Bridges (Reserved) 16 Section 22. Clinton County. 17 (a) Local Bridges (Reserved) 18 (b) State Bridges (Reserved) 19 Section 23. Columbia County. 20 (a) Local Bridges (Reserved) 21 (b) State Bridges (Reserved) 22 Section 24. Crawford County. 23 (a) Local Bridges (Reserved) 24 (b) State Bridges (Reserved) 25 Section 25. Cumberland County. 26 (a) Local Bridges (Reserved) 27 (b) State Bridges (Reserved) 28 Section 26. Dauphin County. 29 (a) Local Bridges (Reserved) 30 (b) State Bridges (Reserved) 20080S1503B2376 - 5 -
1 Section 27. Delaware County. 2 (a) Local Bridges (Reserved) 3 (b) State Bridges (Reserved) 4 Section 28. Elk County. 5 (a) Local Bridges (Reserved) 6 (b) State Bridges (Reserved) 7 Section 29. Erie County. 8 (a) Local Bridges (Reserved) 9 (b) State Bridges (Reserved) 10 Section 30. Fayette County. 11 (a) Local Bridges (Reserved) 12 (b) State Bridges (Reserved) 13 Section 31. Forest County. 14 (a) Local Bridges (Reserved) 15 (b) State Bridges (Reserved) 16 Section 32. Franklin County. 17 (a) Local Bridges (Reserved) 18 (b) State Bridges 19 Projects are as follows: 20 (1) I-81 Northbound, Bridge No.17389, over 21 Abandoned Railroad, Greene Township, 22 Bridge Removal 323,500 23 (Base Project Allocation - $323,500) 24 (2) I-81 Northbound, Bridge No.17390, over 25 Conococheague Creek, Greene Township, 26 Bridge Replacement 905,000 27 (Base Project Allocation - $905,000) 28 (3) I-81 Southbound, Bridge No.17392, over 29 Abandoned Railroad, Greene Township, 30 Bridge Removal 323,500 20080S1503B2376 - 6 -
1 (Base Project Allocation - $323,500) 2 (4) I-81 Southbound, Bridge No.17393, over 3 Conococheague Creek, Greene Township, 4 Bridge Replacement 905,000 5 (Base Project Allocation - $905,000) 6 (5) SR 1003, Bridge No.17483, over I-81, 7 Greene Township, Bridge Rehabilitation 129,400 8 (Base Project Allocation - $129,400) 9 Section 33. Fulton County. 10 (a) Local Bridges (Reserved) 11 (b) State Bridges (Reserved) 12 Section 34. Greene County. 13 (a) Local Bridges (Reserved) 14 (b) State Bridges (Reserved) 15 Section 35. Huntingdon County. 16 (a) Local Bridges (Reserved) 17 (b) State Bridges (Reserved) 18 Section 36. Indiana County. 19 (a) Local Bridges (Reserved) 20 (b) State Bridges (Reserved) 21 Section 37. Jefferson County. 22 (a) Local Bridges (Reserved) 23 (b) State Bridges (Reserved) 24 Section 38. Juniata County. 25 (a) Local Bridges (Reserved) 26 (b) State Bridges 27 Projects are as follows: 28 (1) SR 2017, over Dutchman Run, Greenwood 29 Township, Bridge Rehabilitation 220,000 30 (Base Project Allocation - $140,000) 20080S1503B2376 - 7 -
1 (Land Allocation - $30,000) 2 (Design and Contingencies - $50,000) 3 Section 39. Lackawanna County. 4 (a) Local Bridges (Reserved) 5 (b) State Bridges (Reserved) 6 Section 40. Lancaster County. 7 (a) Local Bridges (Reserved) 8 (b) State Bridges 9 Projects are as follows: 10 (1) PA 896, over Mill Creek, East Lampeter 11 Township, Bridge Rehabilitation 2,515,000 12 (Base Project Allocation - $1,115,000) 13 (Design and Contingencies - $1,400,000) 14 Section 41. Lawrence County. 15 (a) Local Bridges (Reserved) 16 (b) State Bridges 17 Projects are as follows: 18 (1) SR 2005, over Slippery Rock Creek, 19 Wayne Township, Bridge Replacement 3,500,000 20 (Base Project Allocation - $3,500,000) 21 Section 42. Lebanon County. 22 (a) Local Bridges (Reserved) 23 (b) State Bridges (Reserved) 24 Section 43. Lehigh County. 25 (a) Local Bridges (Reserved) 26 (b) State Bridges (Reserved) 27 Section 44. Luzerne County. 28 (a) Local Bridges (Reserved) 29 (b) State Bridges 30 Projects are as follows: 20080S1503B2376 - 8 -
1 (1) SR 2032, near Intersection of SR 2030, 2 over Abandoned Railroad, Duryea and 3 Hughestown Boroughs, Railroad Abutments 4 Removal 18,000 5 (Base Project Allocation - $18,000) 6 (2) SR 2029, York Avenue near Intersection 7 with Wood Street, over Abandoned 8 Railroad, Duryea Borough, Railroad 9 Abutments Removal 26,000 10 (Base Project Allocation - $18,000) 11 (Land Allocation - $8,000) 12 Section 45. Lycoming County. 13 (a) Local Bridges (Reserved) 14 (b) State Bridges (Reserved) 15 Section 46. McKean County. 16 (a) Local Bridges (Reserved) 17 (b) State Bridges (Reserved) 18 Section 47. Mercer County. 19 (a) Local Bridges (Reserved) 20 (b) State Bridges (Reserved) 21 Section 48. Mifflin County. 22 (a) Local Bridges (Reserved) 23 (b) State Bridges (Reserved) 24 Section 49. Monroe County. 25 (a) Local Bridges (Reserved) 26 (b) State Bridges (Reserved) 27 Section 50. Montgomery County. 28 (a) Local Bridges (Reserved) 29 (b) State Bridges 30 Projects are as follows: 20080S1503B2376 - 9 -
1 (1) SR 8012, Ramp F, over City Line 2 Avenue, Northbound Ramp, Lower Merion 3 Township, Bridge Rehabilitation 2,000,000 4 (Base Project Allocation - $2,000,000) 5 (2) SR 8012, Ramp G, Ramp B, Ramp C, Lower 6 Merion Township, Bridge Rehabilitation 2,000,000 7 (Base Project Allocation - $2,000,000) 8 (3) SR 0076, Schuylkill Expressway, Ramp G 9 from Westbound I-76, Lower Merion 10 Township, Bridge Rehabilitation 2,000,000 11 (Base Project Allocation - $2,000,000) 12 (4) SR 0076, Schuylkill Expressway, over 13 Hollow Creek Road, Lower Merion 14 Township, Bridge Rehabilitation 2,000,000 15 (Base Project Allocation - $2,000,000) 16 (5) SR 0076, Schuylkill Expressway, Ramp 17 C, over City Line Avenue, Lower Merion 18 Township, Bridge Rehabilitation 2,000,000 19 (Base Project Allocation - $2,000,000) 20 (6) SR 0076, Schuylkill Expressway, Ramp 21 F, over City Line Avenue, Lower Merion 22 Township, Bridge Rehabilitation 2,000,000 23 (Base Project Allocation - $2,000,000) 24 (7) SR 0076, Schuylkill Expressway, over 25 Belmont Avenue, Lower Merion Township, 26 Bridge Rehabilitation 2,000,000 27 (Base Project Allocation - $2,000,000) 28 (8) SR 0076, Schuylkill Expressway, over 29 CONRAIL Railroad, Lower Merion 30 Township, Bridge Rehabilitation 2,000,000 20080S1503B2376 - 10 -
1 (Base Project Allocation - $2,000,000) 2 (9) SR 0076, Schuylkill Expressway, over 3 North Gulph Road, Upper Merion 4 Township, Bridge Rehabilitation 2,000,000 5 (Base Project Allocation - $2,000,000) 6 (10) SR 0076, LR 46138, Schuylkill 7 Expressway, over Arrowmink Creek, West 8 Conshohocken Borough, Bridge 9 Rehabilitation 2,000,000 10 (Base Project Allocation - $2,000,000) 11 Section 51. Montour County. 12 (a) Local Bridges (Reserved) 13 (b) State Bridges (Reserved) 14 Section 52. Northampton County. 15 (a) Local Bridges (Reserved) 16 (b) State Bridges (Reserved) 17 Section 53. Northumberland County. 18 (a) Local Bridges (Reserved) 19 (b) State Bridges 20 Projects are as follows: 21 (1) SR 0487, over Shamokin Creek, Ralpho 22 Township, Bridge Rehabilitation 520,000 23 (Base Project Allocation - $500,000) 24 (Design and Contingencies - $20,000) 25 Section 54. Perry County. 26 (a) Local Bridges (Reserved) 27 (b) State Bridges (Reserved) 28 Section 55. City of Philadelphia 29 (a) Local Bridges (Reserved) 30 (b) State Bridges 20080S1503B2376 - 11 -
1 Projects are as follows: 2 (1) SR 0076, Ramp E and Ramp H, over 3 Tributary of Schuylkill River, City of 4 Philadelphia, Bridge Rehabilitation 2,000,000 5 (Base Project Allocation - $2,000,000) 6 (2) SR 0076, Schuylkill Expressway, Ramp C 7 from Vine Street, City of Philadelphia, 8 Bridge Rehabilitation 2,000,000 9 (Base Project Allocation - $2,000,000) 10 (3) SR 0076, Schuylkill Expressway, over 11 Montgomery Drive, City of Philadelphia, 12 Bridge Rehabilitation 2,000,000 13 (Base Project Allocation - $2,000,000) 14 (4) SR 0076, Schuylkill Expressway, over 15 Black Road, City of Philadelphia, 16 Bridge Rehabilitation 2,000,000 17 (Base Project Allocation - $2,000,000) 18 (5) SR 0076, Schuylkill Expressway, over 19 Neill Drive, City of Philadelphia, 20 Bridge Rehabilitation 2,000,000 21 (Base Project Allocation - $2,000,000) 22 (6) SR 0076, LR 67058, Schuylkill 23 Expressway, Ramp B, City of 24 Philadelphia, Bridge Rehabilitation 2,000,000 25 (Base Project Allocation - $2,000,000) 26 (7) SR 0076, Schuylkill Expressway, over 27 Schuylkill River Bank, City of 28 Philadelphia, Bridge Rehabilitation 2,000,000 29 (Base Project Allocation - $2,000,000) 30 (8) SR 0076, Schuylkill Expressway, Bridge 20080S1503B2376 - 12 -
1 No.38479, Pile Supported Slab, City of 2 Philadelphia, Bridge Rehabilitation 2,000,000 3 (Base Project Allocation - $2,000,000) 4 (9) SR 0076, Schuylkill Expressway, Bridge 5 No.38484, Pile Supported Slab, City of 6 Philadelphia, Bridge Rehabilitation 2,000,000 7 (Base Project Allocation - $2,000,000) 8 Section 56. Pike County. 9 (a) Local Bridges (Reserved) 10 (b) State Bridges (Reserved) 11 Section 57. Potter County. 12 (a) Local Bridges (Reserved) 13 (b) State Bridges (Reserved) 14 Section 58. Schuylkill County. 15 (a) Local Bridges (Reserved) 16 (b) State Bridges (Reserved) 17 Section 59. Snyder County. 18 (a) Local Bridges (Reserved) 19 (b) State Bridges (Reserved) 20 Section 60. Somerset County. 21 (a) Local Bridges (Reserved) 22 (b) State Bridges (Reserved) 23 Section 61. Sullivan County. 24 (a) Local Bridges (Reserved) 25 (b) State Bridges (Reserved) 26 Section 62. Susquehanna County. 27 (a) Local Bridges 28 Projects are as follows: 29 (1) Choconut Township, T-695, over 30 Choconut Creek, Susquehanna Township, 20080S1503B2376 - 13 -
1 Bridge Replacement 350,000 2 (Base Project Allocation - $350,000) 3 (b) State Bridges (Reserved) 4 Section 63. Tioga County. 5 (a) Local Bridges (Reserved) 6 (b) State Bridges 7 Projects are as follows: 8 (1) SR 4024, over Branch of Elkhorn Creek, 9 Farmington Township, Bridge 10 Replacement 180,000 11 (Base Project Allocation - $150,000) 12 (Design and Contingencies - $30,000) 13 Section 64. Union County. 14 (a) Local Bridges (Reserved) 15 (b) State Bridges (Reserved) 16 Section 65. Venango County. 17 (a) Local Bridges (Reserved) 18 (b) State Bridges (Reserved) 19 Section 66. Warren County. 20 (a) Local Bridges (Reserved) 21 (b) State Bridges (Reserved) 22 Section 67. Washington County. 23 (a) Local Bridges (Reserved) 24 (b) State Bridges (Reserved) 25 Section 68. Wayne County. 26 (a) Local Bridges (Reserved) 27 (b) State Bridges (Reserved) 28 Section 69. Westmoreland County. 29 (a) Local Bridges (Reserved) 30 (b) State Bridges (Reserved) 20080S1503B2376 - 14 -
1 Section 70. Wyoming County. 2 (a) Local Bridges (Reserved) 3 (b) State Bridges (Reserved) 4 Section 71. York County. 5 (a) Local Bridges (Reserved) 6 (b) State Bridges 7 Projects are as follows: 8 (1) I-83, over York Railroad and Codorus 9 Creek, Spring Garden Township, Bridge 10 Rehabilitation 1,200,000 11 (Base Project Allocation - $810,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $370,000) 14 (2) I-83, over SR 0214 and PA 214, 15 Springfield Township, Bridge 16 Rehabilitation 147,000 17 (Base Project Allocation - $55,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $82,000) 20 (3) I-83, over Lake Redmans Creek, York 21 Township, Bridge Rehabilitation 147,000 22 (Base Project Allocation - $55,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $82,000) 25 Section 72. Statewide bicycle and pedestrian 26 structures. 27 Rehabilitation, construction and demolition of 28 bridges and other crossing structures on bicycle 29 and pedestrian ways to be identified by the 30 Department of Conservation and Natural Resources, 20080S1503B2376 - 15 -
1 which will manage the construction and the funds 2 upon the completion of a memorandum of 3 understanding with the department. 000,000,000 4 Section 73. Limitation on expenditure of funds. 5 Any moneys derived from the incurring of debt shall be used 6 solely for effecting the rehabilitation, replacement or removal 7 of bridges located on State highways. All other bridge 8 rehabilitation, replacement or removal shall be financed from 9 current revenue. 10 Section 74. Debt authorization. 11 The Governor, Auditor General and State Treasurer are hereby 12 authorized and directed to borrow from time to time, in addition 13 to any authorization heretofore or hereafter enacted, on the 14 credit of the Commonwealth, subject to the limitations provided 15 in the current capital budget, money not exceeding in the 16 aggregate the sum of $000,000,000 as may be found necessary to 17 carry out the acquisition and construction of the State projects 18 specifically itemized in this act. 19 Section 75. Issue of bonds. 20 The indebtedness authorized in this act shall be incurred 21 from time to time and shall be evidenced by one or more series 22 of general obligation bonds of the Commonwealth in such 23 aggregate principal amount for each series as the Governor, 24 Auditor General and State Treasurer shall determine, but the 25 latest stated maturity date shall not exceed 30 years from the 26 date of the bond first issued for each series. 27 Section 76. Estimated useful life of projects. 28 The General Assembly states the estimated useful life of the 29 projects itemized in this act as 30 years. 30 Section 77. Appropriation. 20080S1503B2376 - 16 -
1 The net proceeds of the sale of the obligations authorized in 2 this act are hereby appropriated from the Capital Facilities 3 Fund to the department in the maximum amount of $000,000,000 to 4 be used by it exclusively to defray the financial costs of the 5 State projects specifically itemized in this capital budget. 6 After reserving or paying the expenses of the sale of the 7 obligation, the State Treasurer shall pay out to the department 8 the moneys as required and certified by it to be legally due and 9 payable. 10 Section 78. Federal funds. 11 In addition to those funds appropriated in section 77, all 12 moneys received from the Federal Government for the public 13 improvement projects specifically itemized in this act are also 14 hereby appropriated for those projects. 15 Section 79. Allocation of funds. 16 (a) General rule.--Whenever the department or the Department 17 of Conservation and Natural Resources determines that the full 18 estimated financial costs of the projects itemized in this act 19 are not necessary for the proper design, acquisition or 20 construction of such projects, the excess funds no longer 21 required may be allocated by the department or the Department of 22 Conservation and Natural Resources to increase the estimated 23 costs of any one or more of the projects specifically itemized 24 in a capital budget. 25 (b) Reimbursement of municipal expenditures.--Moneys raised 26 or expended by municipalities after the effective date of this 27 act, in anticipation of receipt of funds authorized for projects 28 itemized by this act, may be reimbursable to those 29 municipalities. 30 Section 80. Policy on jobs and materials. 20080S1503B2376 - 17 -
1 (a) Jobs.--It is the declared policy of the Commonwealth 2 that the construction projects authorized in this act be used, 3 to the greatest extent possible, to provide for the creation of 4 jobs and the rehiring of the unemployed in this Commonwealth. In 5 order to reach this goal, firms with Commonwealth-based 6 facilities shall be actively solicited to make bids on contracts 7 to furnish products and materials, including, but not limited 8 to, steel and steel products, to be used in these projects. 9 (b) Materials.--Every contract document entered into to 10 undertake a project contained in this act shall provide that any 11 steel or other products to be used or supplied in the 12 performance of this contract shall be required to be 13 manufactured by plants in the United States unless the secretary 14 determines, on a contract by contract basis, that certain 15 required products are not produced in the United States in 16 sufficient quantities to meet the requirements of the contract. 17 Such a determination and the reasons therefor shall be published 18 in the Pennsylvania Bulletin. Decisions made under this 19 subsection shall not be inconsistent with the general provisions 20 of the act of March 3, 1978 (P.L.6, No.3), known as the Steel 21 Products Procurement Act. 22 (c) Minorities and women.--It is also the declared policy of 23 the Commonwealth to require and encourage substantial 24 participation by minorities and women in the construction 25 projects authorized by this act. 26 Section 81. Payment of capital debt service. 27 The repayment of any debt incurred pursuant to this act shall 28 be made from the account and such repayment shall have first 29 claim on the revenues of the account. 30 Section 82. Authorization and debt cumulation. 20080S1503B2376 - 18 -
1 The additional authorization and debt allowance provided for 2 in this act shall be added to the total authorizations and debt 3 incurred pursuant to the act of December 8, 1982 (P.L.848, 4 No.235), known as the Highway-Railroad and Highway Bridge 5 Capital Budget Act for 1982-1983, as amended and supplemented. 6 Section 83. Editorial changes. 7 In editing and preparing this act for printing following the 8 final enactment, the Legislative Reference Bureau shall insert 9 or revise letters or numbers for projects where the letters or 10 numbers are missing or require revision. The bureau shall also 11 revise the total monetary amounts for the total authorization, 12 debt authorization, appropriations and departmental totals as 13 necessary to agree with the total monetary amounts of the 14 projects. 15 Section 84. Effective date. 16 This act shall take effect immediately. 17 SECTION 1. SHORT TITLE. <-- 18 THIS ACT SHALL BE KNOWN AND MAY BE CITED AS THE HIGHWAY- 19 RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET SUPPLEMENTAL ACT FOR 20 2008-2009. 21 SECTION 2. DEFINITIONS. 22 THE FOLLOWING WORDS AND PHRASES WHEN USED IN THIS ACT SHALL 23 HAVE THE MEANINGS GIVEN TO THEM IN THIS SECTION UNLESS THE 24 CONTEXT CLEARLY INDICATES OTHERWISE: 25 "CAPITAL PROJECT." A CAPITAL PROJECT AS DEFINED IN SECTION 26 302 OF THE ACT OF FEBRUARY 9, 1999 (P.L.1, NO.1), KNOWN AS THE 27 CAPITAL FACILITIES DEBT ENABLING ACT, AND SHALL INCLUDE A COUNTY 28 OR MUNICIPAL BRIDGE REHABILITATION, REPLACEMENT OR IMPROVEMENT 29 PROJECT AS SET FORTH IN THIS ACT. 30 "DEPARTMENT." THE DEPARTMENT OF TRANSPORTATION OF THE 20080S1503B2376 - 19 -
1 COMMONWEALTH. 2 "SECRETARY." THE SECRETARY OF TRANSPORTATION OF THE 3 COMMONWEALTH. 4 SECTION 3. TOTAL AUTHORIZATION FOR BRIDGE PROJECTS. 5 (A) TOTAL PROJECTS.--THE TOTAL AUTHORIZATION FOR THE COSTS 6 OF THE PROJECTS ITEMIZED PURSUANT TO THIS ACT AND TO BE FINANCED 7 FROM CURRENT REVENUE OR BY THE INCURRING OF DEBT SHALL BE 8 $1,453,720,000. 9 (B) STATE PROJECTS.--THE AUTHORIZATION FOR CAPITAL PROJECTS 10 IN THE CATEGORY OF HIGHWAY BRIDGE PROJECTS AND FORESTRY AND 11 STATE PARK BRIDGE PROJECTS TO BE CONSTRUCTED BY THE DEPARTMENT 12 OF TRANSPORTATION, ITS SUCCESSORS OR ASSIGNS, AND TO BE FINANCED 13 BY THE INCURRING OF DEBT OR FROM CURRENT REVENUE, ITEMIZED IN 14 THIS ACT UNDER THE CATEGORY OF STATE BRIDGES, SHALL BE 15 $1,150,048,000. 16 (C) NON-STATE PROJECTS.--THE AUTHORIZATION FOR NON-STATE 17 HIGHWAY BRIDGE PROJECTS TO BE CONSTRUCTED BY MUNICIPALITIES AND 18 TO BE FINANCED IN PART WITH GRANTS NOT EXCEEDING 80% OF THE NON- 19 FEDERAL SHARE OF THE COSTS MADE TO THE LOCAL GOVERNMENT 20 MUNICIPALITIES BY THE DEPARTMENT FROM CURRENT REVENUES ITEMIZED 21 IN THIS ACT UNDER THE CATEGORY OF LOCAL BRIDGES, SHALL BE 22 $303,672,000. 23 SECTION 4. ITEMIZATION OF BRIDGE PROJECTS. 24 THE INDIVIDUAL CAPITAL PROJECTS IN THE CATEGORY OF HIGHWAY 25 PROJECTS TO BE CONSTRUCTED BY THE DEPARTMENT OF TRANSPORTATION, 26 ITS SUCCESSORS OR ASSIGNS, AND TO BE FINANCED FROM CURRENT 27 REVENUE OR BY THE INCURRING OF DEBT ARE HEREBY ITEMIZED, 28 TOGETHER WITH THEIR ESTIMATED FINANCIAL COSTS, IN THE FOLLOWING 29 SECTIONS. 30 SECTION 5. ADAMS COUNTY. 20080S1503B2376 - 20 -
1 (A) LOCAL BRIDGES (RESERVED) 2 (B) STATE BRIDGES 3 (1) SR 0030, EAST KING STREET OVER BEAVER 4 CREEK, ABBOTTSTOWN BOROUGH, BRIDGE 5 REPLACEMENT 420,000 6 (BASE PROJECT ALLOCATION - $300,000) 7 (LAND ALLOCATION - $20,000) 8 (DESIGN AND CONTINGENCIES - $100,000) 9 (2) SR 0194, PA 194 OVER BRANCH OF BEAVER 10 CREEK, BERWICK TOWNSHIP, BRIDGE 11 REPLACEMENT 187,000 12 (LAND ALLOCATION - $24,000) 13 (DESIGN AND CONTINGENCIES - $163,000) 14 (3) SR 0194, PA 194, BRIDGE NO.125 OVER 15 TRIBUTARY OF BEAVER CREEK, BERWICK 16 TOWNSHIP, BRIDGE REPLACEMENT 117,000 17 (LAND ALLOCATION - $15,000) 18 (DESIGN AND CONTINGENCIES - $102,000) 19 (4) SR 0194, PA 194, BRIDGE NO.126 OVER 20 TRIBUTARY OF BEAVER CREEK, BERWICK 21 TOWNSHIP, BRIDGE REPLACEMENT 131,000 22 (LAND ALLOCATION - $17,000) 23 (DESIGN AND CONTINGENCIES - $114,000) 24 (5) SR 4014 OVER TRIBUTARY OF CONEWAGO 25 CREEK, BUTLER TOWNSHIP, BRIDGE 26 REPLACEMENT 70,000 27 (BASE PROJECT ALLOCATION - $70,000) 28 (6) SR 3004, MARSH CREEK ROAD OVER SR 29 0015, CUMBERLAND TOWNSHIP, BRIDGE 30 REHABILITATION 230,000 20080S1503B2376 - 21 -
1 (BASE PROJECT ALLOCATION - $175,000) 2 (LAND ALLOCATION - $5,000) 3 (DESIGN AND CONTINGENCIES - $50,000) 4 (7) SR 0134, TANEYTOWN ROAD OVER SR 0015, 5 CUMBERLAND TOWNSHIP, BRIDGE 6 REHABILITATION 230,000 7 (BASE PROJECT ALLOCATION - $175,000) 8 (LAND ALLOCATION - $5,000) 9 (DESIGN AND CONTINGENCIES - $50,000) 10 (8) SR 0016, WAYNESBORO PIKE OVER MINEY 11 BRANCH OF TOMS CREEK, HAMILTONBAN 12 TOWNSHIP, BRIDGE REHABILITATION 1,700,000 13 (BASE PROJECT ALLOCATION - $745,000) 14 (DESIGN AND CONTINGENCIES - $955,000) 15 (9) SR 1009 OVER TRIBUTARY OF MUD RUN, 16 HUNTINGTON TOWNSHIP, BRIDGE 17 REPLACEMENT 70,000 18 (BASE PROJECT ALLOCATION - $70,000) 19 (10) PA 94 OVER BERMUDIAN CREEK, LATIMORE 20 TOWNSHIP, BRIDGE REHABILITATION 1,755,000 21 (BASE PROJECT ALLOCATION - $1,600,000) 22 (LAND ALLOCATION - $55,000) 23 (DESIGN AND CONTINGENCIES - $100,000) 24 (11) SR 1007 OVER BERMUDIAN CREEK, 25 LATIMORE TOWNSHIP, BRIDGE 26 REHABILITATION 626,000 27 (BASE PROJECT ALLOCATION - $500,000) 28 (LAND ALLOCATION - $5,000) 29 (DESIGN AND CONTINGENCIES - $121,000) 30 (12) SR 0016, WAYNESBORO PARKWAY OVER TOMS 20080S1503B2376 - 22 -
1 CREEK, LIBERTY TOWNSHIP, BRIDGE 2 REHABILITATION 3,622,000 3 (BASE PROJECT ALLOCATION - $1,716,000) 4 (DESIGN AND CONTINGENCIES - $1,906,000) 5 (13) SR 2001, BON-OX ROAD OVER STAMBAUGH 6 RUN, MT. PLEASANT TOWNSHIP, BRIDGE 7 REHABILITATION 647,000 8 (BASE PROJECT ALLOCATION - $647,000) 9 (14) SR 2001 OVER TRIBUTARY OF WHITE RUN, 10 MT. PLEASANT TOWNSHIP, BRIDGE 11 REPLACEMENT 761,000 12 (BASE PROJECT ALLOCATION - $389,000) 13 (LAND ALLOCATION - $40,000) 14 (DESIGN AND CONTINGENCIES - $332,000) 15 (15) SR 3003, HUNTERSTOWN ROAD OVER SR 16 0015, STRABAN TOWNSHIP, BRIDGE 17 REHABILITATION 230,000 18 (BASE PROJECT ALLOCATION - $175,000) 19 (LAND ALLOCATION - $5,000) 20 (DESIGN AND CONTINGENCIES - $50,000) 21 (16) SR 0394, PA 394 OVER TRIBUTARY OF 22 BEAVER CREEK, STRABAN TOWNSHIP, BRIDGE 23 REPLACEMENT 770,000 24 (BASE PROJECT ALLOCATION - $550,000) 25 (LAND ALLOCATION - $40,000) 26 (DESIGN AND CONTINGENCIES - $180,000) 27 (17) SR 0394 OVER SR 0015, STRABAN 28 TOWNSHIP, BRIDGE REHABILITATION 230,000 29 (BASE PROJECT ALLOCATION - $175,000) 30 (LAND ALLOCATION - $5,000) 20080S1503B2376 - 23 -
1 (DESIGN AND CONTINGENCIES - $50,000) 2 (18) SR 3001, OLD HARRISBURG ROAD, BRIDGE 3 NO.270 OVER TRIBUTARY OF CONEWAGO 4 CREEK, STRABAN TOWNSHIP, BRIDGE 5 REPLACEMENT 70,000 6 (BASE PROJECT ALLOCATION - $70,000) 7 (19) SR 3001, OLD HARRISBURG ROAD, BRIDGE 8 NO.271 OVER TRIBUTARY OF CONEWAGO 9 CREEK, STRABAN TOWNSHIP, BRIDGE 10 REPLACEMENT 70,000 11 (BASE PROJECT ALLOCATION - $70,000) 12 SECTION 6. ALLEGHENY COUNTY. 13 (A) LOCAL BRIDGES 14 (1) BEN AVON BOROUGH, SPRUCE STREET OVER 15 SPRUCE RUN, BRIDGE REPLACEMENT 500,000 16 (BASE PROJECT ALLOCATION - $312,000) 17 (LAND ALLOCATION - $12,000) 18 (DESIGN AND CONTINGENCIES - $176,000) 19 (2) CARNEGIE BOROUGH, CAROTHERS STREET 20 OVER CHARTIERS CREEK, BRIDGE 21 REHABILITATION 1,946,000 22 (BASE PROJECT ALLOCATION - $1,520,000) 23 (LAND ALLOCATION - $10,000) 24 (DESIGN AND CONTINGENCIES - $416,000) 25 (3) CITY OF PITTSBURGH, SIXTH STREET OVER 26 ALLEGHENY RIVER, 10TH STREET BYPASS, 27 BRIDGE REHABILITATION 362,000 28 (BASE PROJECT ALLOCATION - $275,000) 29 (DESIGN AND CONTINGENCIES - $87,000) 30 (4) CITY OF PITTSBURGH, SEVENTH STREET 20080S1503B2376 - 24 -
1 OVER ALLEGHENY RIVER, 10TH STREET 2 BYPASS, BRIDGE REHABILITATION 362,000 3 (BASE PROJECT ALLOCATION - $275,000) 4 (DESIGN AND CONTINGENCIES - $87,000) 5 (5) CITY OF PITTSBURGH, NINTH STREET OVER 6 ALLEGHENY RIVER, 10TH STREET BYPASS, 7 BRIDGE REHABILITATION 362,000 8 (BASE PROJECT ALLOCATION - $275,000) 9 (DESIGN AND CONTINGENCIES - $87,000) 10 (6) CITY OF PITTSBURGH, SOUTH TENTH STREET 11 OVER RAILROAD AND I-376, BRIDGE 12 REHABILITATION 1,553,000 13 (BASE PROJECT ALLOCATION - $1,350,000) 14 (LAND ALLOCATION - $8,000) 15 (DESIGN AND CONTINGENCIES - $195,000) 16 (7) CITY OF PITTSBURGH, CHARTIERS AVENUE 17 OVER PAT AIRPORT BUSWAY, BRIDGE 18 REPLACEMENT 1,178,000 19 (BASE PROJECT ALLOCATION - $900,000) 20 (LAND ALLOCATION - $8,000) 21 (DESIGN AND CONTINGENCIES - $270,000) 22 (8) CITY OF PITTSBURGH, SOUTH NEGLEY 23 AVENUE, OVER RAILROAD AND PAT BUSWAY, 24 BRIDGE REPLACEMENT 1,178,000 25 (BASE PROJECT ALLOCATION - $900,000) 26 (LAND ALLOCATION - $8,000) 27 (DESIGN AND CONTINGENCIES - $270,000) 28 (9) COLLIER TOWNSHIP, THOMS RUN ROAD OVER 29 THOMS RUN, BRIDGE REPLACEMENT 580,000 30 (BASE PROJECT ALLOCATION - $352,000) 20080S1503B2376 - 25 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $208,000) 3 (10) CRESCENT TOWNSHIP, ACCESS ROAD OVER 4 FLAUGHERTY RUN, BRIDGE REHABILITATION 540,000 5 (BASE PROJECT ALLOCATION - $360,000) 6 (LAND ALLOCATION - $12,000) 7 (DESIGN AND CONTINGENCIES - $168,000) 8 (11) FAWN TOWNSHIP, DAWSON ROAD OVER BULL 9 CREEK, BRIDGE REPLACEMENT 758,000 10 (BASE PROJECT ALLOCATION - $552,000) 11 (LAND ALLOCATION - $10,000) 12 (DESIGN AND CONTINGENCIES - $196,000) 13 (12) FINDLAY TOWNSHIP, IMPERIAL - 14 BURGETTSTOWN ROAD OVER NORTH FORK 15 MONTOUR RUN, BRIDGE REHABILITATION 546,000 16 (BASE PROJECT ALLOCATION - $340,000) 17 (LAND ALLOCATION - $10,000) 18 (DESIGN AND CONTINGENCIES - $196,000) 19 (13) FINDLAY TOWNSHIP, STEUBENVILLE - 20 ENLOW ROAD NO.04 OVER MONTOUR RUN, 21 BRIDGE REPLACEMENT 526,000 22 (BASE PROJECT ALLOCATION - $308,000) 23 (LAND ALLOCATION - $50,000) 24 (DESIGN AND CONTINGENCIES - $168,000) 25 (14) FORWARD TOWNSHIP, PANGBURN HOLLOW 26 ROAD NO.03 OVER PERRY MILL RUN, BRIDGE 27 REPLACEMENT 104,000 28 (BASE PROJECT ALLOCATION - $84,000) 29 (LAND ALLOCATION - $2,000) 30 (DESIGN AND CONTINGENCIES - $18,000) 20080S1503B2376 - 26 -
1 (15) FORWARD TOWNSHIP, PANGBURN HOLLOW 2 ROAD NO.08 OVER PERRY MILL RUN, BRIDGE 3 REPLACEMENT 104,000 4 (BASE PROJECT ALLOCATION - $84,000) 5 (LAND ALLOCATION - $2,000) 6 (DESIGN AND CONTINGENCIES - $18,000) 7 (16) FORWARD TOWNSHIP, PANGBURN HOLLOW 8 ROAD NO.13 OVER PERRY MILL RUN, BRIDGE 9 REPLACEMENT 104,000 10 (BASE PROJECT ALLOCATION - $84,000) 11 (LAND ALLOCATION - $2,000) 12 (DESIGN AND CONTINGENCIES - $18,000) 13 (17) FORWARD TOWNSHIP, PANGBURN HOLLOW 14 ROAD NO.04 OVER PERRY MILL RUN, BRIDGE 15 REPLACEMENT 382,000 16 (BASE PROJECT ALLOCATION - $300,000) 17 (LAND ALLOCATION - $10,000) 18 (DESIGN AND CONTINGENCIES - $72,000) 19 (18) FORWARD TOWNSHIP, PANGBURN HOLLOW 20 ROAD NO.07 OVER PERRY MILL RUN, BRIDGE 21 REPLACEMENT 104,000 22 (BASE PROJECT ALLOCATION - $84,000) 23 (LAND ALLOCATION - $2,000) 24 (DESIGN AND CONTINGENCIES - $18,000) 25 (19) FORWARD TOWNSHIP, PANGBURN HOLLOW 26 ROAD NO.09 OVER PERRY MILL RUN, BRIDGE 27 REPLACEMENT 104,000 28 (BASE PROJECT ALLOCATION - $84,000) 29 (LAND ALLOCATION - $2,000) 30 (DESIGN AND CONTINGENCIES - $18,000) 20080S1503B2376 - 27 -
1 (20) INDIANA TOWNSHIP, MCCLELLAND ROAD 2 OVER DEER CREEK, BRIDGE REPLACEMENT 792,000 3 (BASE PROJECT ALLOCATION - $566,000) 4 (LAND ALLOCATION - $10,000) 5 (DESIGN AND CONTINGENCIES - $216,000) 6 (21) INDIANA TOWNSHIP, JACOBY ROAD OVER 7 LITTLE DEER CREEK, BRIDGE REPLACEMENT 918,000 8 (BASE PROJECT ALLOCATION - $600,000) 9 (LAND ALLOCATION - $18,000) 10 (DESIGN AND CONTINGENCIES - $300,000) 11 (22) MCCANDLESS TOWNSHIP, HIGHLAND ROAD 12 OVER LOWRIES RUN EAST BRANCH, BRIDGE 13 REPLACEMENT 296,000 14 (BASE PROJECT ALLOCATION - $220,000) 15 (LAND ALLOCATION - $8,000) 16 (DESIGN AND CONTINGENCIES - $68,000) 17 (23) MOON TOWNSHIP, SCOTT ROAD OVER 18 MONTOUR RUN, BRIDGE REPLACEMENT 618,000 19 (BASE PROJECT ALLOCATION - $300,000) 20 (LAND ALLOCATION - $14,000) 21 (DESIGN AND CONTINGENCIES - $304,000) 22 (24) NORTH BRADDOCK BOROUGH, CENTRE AVENUE 23 OVER O'CONNELL BOULEVARD, BRIDGE 24 REHABILITATION 3,633,000 25 (BASE PROJECT ALLOCATION - $3,450,000) 26 (LAND ALLOCATION - $3,000) 27 (DESIGN AND CONTINGENCIES - $180,000) 28 (25) PINE TOWNSHIP, ICE RINK ROAD OVER 29 PINE CREEK NORTH BRANCH, BRIDGE 30 REPLACEMENT 512,000 20080S1503B2376 - 28 -
1 (BASE PROJECT ALLOCATION - $312,000) 2 (DESIGN AND CONTINGENCIES - $200,000) 3 (26) PLUM BOROUGH, STOTLER ROAD OVER PLUM 4 CREEK, BRIDGE REPLACEMENT 652,000 5 (BASE PROJECT ALLOCATION - $384,000) 6 (LAND ALLOCATION - $12,000) 7 (DESIGN AND CONTINGENCIES - $256,000) 8 (27) ROSS TOWNSHIP, BELLEVUE ROAD OVER SR 9 0279, BRIDGE REHABILITATION 53,000 10 (DESIGN AND CONTINGENCIES - $53,000) 11 (28) ROSS TOWNSHIP, CORNELL AVENUE OVER I- 12 279 PARKWAY NORTH BOUND, SPRUCE RUN, 13 BRIDGE REHABILITATION 1,553,000 14 (BASE PROJECT ALLOCATION - $1,425,000) 15 (LAND ALLOCATION - $8,000) 16 (DESIGN AND CONTINGENCIES - $120,000) 17 (29) SHALER TOWNSHIP, ELFINWILD ROAD OVER 18 PINE CREEK, BRIDGE REHABILITATION 708,000 19 (BASE PROJECT ALLOCATION - $424,000) 20 (LAND ALLOCATION - $12,000) 21 (DESIGN AND CONTINGENCIES - $272,000) 22 (30) SOUTH PARK TOWNSHIP, SR 7219 NO.9 23 LC09 OVER LICKS RUN, BRIDGE 24 REHABILITATION 360,000 25 (BASE PROJECT ALLOCATION - $280,000) 26 (LAND ALLOCATION - $8,000) 27 (DESIGN AND CONTINGENCIES - $72,000) 28 (31) WEST ELIZABETH BOROUGH, SCOTIA HOLLOW 29 ROAD BRIDGE XC01 OVER SCOTIA HOLLOW 30 RUN, BRIDGE REPLACEMENT 354,000 20080S1503B2376 - 29 -
1 (BASE PROJECT ALLOCATION - $272,000) 2 (LAND ALLOCATION - $10,000) 3 (DESIGN AND CONTINGENCIES - $72,000) 4 (32) WEST MIFFLIN BOROUGH, HOMEVILLE ROAD 5 NO.05 OVER THOMPSON RUN, UNION 6 RAILROAD, BRIDGE REHABILITATION 780,000 7 (BASE PROJECT ALLOCATION - $600,000) 8 (LAND ALLOCATION - $15,000) 9 (DESIGN AND CONTINGENCIES - $165,000) 10 (33) OAKDALE BOROUGH, FIRST STREET OVER 11 NORTH BRANCH CREEK, BRIDGE 12 REHABILITATION 1,000,000 13 (BASE PROJECT ALLOCATION - $1,000,000) 14 (34) FINDLAY TOWNSHIP, ATEN ROAD OVER 15 INDUSTRY DRIVE, BRIDGE REPLACEMENT 5,000,000 16 (BASE PROJECT ALLOCATION - $5,000,000) 17 (35) NORTH FAYETTE TOWNSHIP, HANS ROAD 18 OVER NORTH BRANCH OF ROBINSON RUN, 19 BRIDGE REPLACEMENT 97,000 20 (BASE PROJECT ALLOCATION - $97,000) 21 (36) COLLIER TOWNSHIP, STEEN ROAD OVER 22 CHARTIERS CREEK, BRIDGE REHABILITATION 20,000 23 (BASE PROJECT ALLOCATION - $20,000) 24 (37) EMSWORTH BOROUGH, GIBSON STREET OVER 25 LOWRIES RUN, BRIDGE REPLACEMENT 2,500,000 26 (BASE PROJECT ALLOCATION - $2,500,000) 27 (38) EMSWORTH BOROUGH, HERRON AVENUE OVER 28 LOWRIES RUN, BRIDGE REPLACEMENT 3,000,000 29 (BASE PROJECT ALLOCATION - $3,000,000) 30 (39) EDGEWORTH BOROUGH, BEAVER ROAD OVER 20080S1503B2376 - 30 -
1 LITTLE SEWICKLEY CREEK, BRIDGE 2 REHABILITATION 100,000 3 (BASE PROJECT ALLOCATION - $100,000) 4 (40) SOUTH PARK TOWNSHIP/JEFFERSON HILLS 5 BOROUGH, WILSON ROAD OVER LICK RUN, 6 BRIDGE REHABILITATION 100,000 7 (BASE PROJECT ALLOCATION - $100,000) 8 (41) SOUTH PARK TOWNSHIP/JEFFERSON HILLS 9 BOROUGH, MCELHENY ROAD OVER LICK RUN, 10 BRIDGE REPLACEMENT 200,000 11 (BASE PROJECT ALLOCATION - $200,000) 12 (42) LEETSDALE BOROUGH, LEE STREET OVER 13 NORFOLK SOUTHERN RAILROAD, BRIDGE 14 REPLACEMENT 5,000,000 15 (BASE PROJECT ALLOCATION - $5,000,000) 16 (43) ROSS TOWNSHIP, BROOKVIEW LANE OVER 17 GIRTY'S RUN, BRIDGE REHABILITATION 310,000 18 (BASE PROJECT ALLOCATION - $310,000) 19 (44) ROSS TOWNSHIP, NELSON RUN ROAD OVER 20 NELSON RUN, BRIDGE REHABILITATION 85,000 21 (BASE PROJECT ALLOCATION - $85,000) 22 (45) ROSS TOWNSHIP, HARRIETT DRIVE OVER 23 GIRTY'S RUN, BRIDGE REHABILITATION 150,000 24 (BASE PROJECT ALLOCATION - $150,000) 25 (46) ETNA BOROUGH, GREELEY AVENUE OVER 26 PINE CREEK, BRIDGE REHABILITATION 648,000 27 (BASE PROJECT ALLOCATION - $648,000) 28 (47) ETNA BOROUGH, DEWEY STREET OVER PINE 29 CREEK, BRIDGE REHABILITATION 386,000 30 (BASE PROJECT ALLOCATION - $386,000) 20080S1503B2376 - 31 -
1 (48) MARSHALL TOWNSHIP, NORTHGATE DRIVE 2 OVER BRUSH CREEK, BRIDGE 3 REHABILITATION 500,000 4 (BASE PROJECT ALLOCATION - $500,000) 5 (49) DRAVOSBURG BOROUGH, MCKEESPORT CITY 6 AND GLASSPORT BOROUGH, W.D. MANSFIELD 7 BRIDGE, PITTSBURGH-MCKEESPORT BOULEVARD 8 OVER MONONGAHELA RIVER, BRIDGE 9 REHABILITATION 35,000,000 10 (BASE PROJECT ALLOCATION - $30,000,000) 11 (DESIGN AND CONTINGENCIES - $5,000,000) 12 (B) STATE BRIDGES 13 (1) SR 3098, GLASS RUN ROAD OVER GLASS 14 RUN, BALDWIN TOWNSHIP, BRIDGE 15 REPLACEMENT 473,000 16 (BASE PROJECT ALLOCATION - $367,000) 17 (LAND ALLOCATION - $18,000) 18 (DESIGN AND CONTINGENCIES - $88,000) 19 (2) SR 4036, BIG SEWICKLEY ROAD OVER BIG 20 SEWICKLEY CREEK, BRADDOCK HILLS 21 BOROUGH, BRIDGE REHABILITATION 958,000 22 (BASE PROJECT ALLOCATION - $938,000) 23 (DESIGN AND CONTINGENCIES - $20,000) 24 (3) SR 0030, ARDMORE BOULEVARD, BRIDGE 25 NO.671 OVER LR 639, ELECTRIC AVENUE, 26 CHALFANT BOROUGH, BRIDGE REPLACEMENT 1,005,000 27 (BASE PROJECT ALLOCATION - $800,000) 28 (LAND ALLOCATION - $25,000) 29 (DESIGN AND CONTINGENCIES - $180,000) 30 (4) SR 0030, ARDMORE BOULEVARD, BRIDGE 20080S1503B2376 - 32 -
1 NO.672 OVER LR 639, ELECTRIC AVENUE, 2 CHALFANT BOROUGH, BRIDGE REPLACEMENT 1,005,000 3 (BASE PROJECT ALLOCATION - $800,000) 4 (LAND ALLOCATION - $25,000) 5 (DESIGN AND CONTINGENCIES - $180,000) 6 (5) SR 2085, BIRMINGHAM OVER CSX RAILROAD 7 AND MONONGAHELA RIVER, CITY OF 8 PITTSBURGH, BRIDGE REHABILITATION 1,010,000 9 (BASE PROJECT ALLOCATION - $1,000,000) 10 (DESIGN AND CONTINGENCIES - $10,000) 11 (6) SR 0837, EIGHTH AVENUE OVER RAMP C, 12 RAMP D AND LOCAL STREETS, CITY OF 13 PITTSBURGH, BRIDGE REHABILITATION 350,000 14 (BASE PROJECT ALLOCATION - $350,000) 15 (7) SR 8059, RAMP A TO SR 0885 SOUTHBOUND 16 OVER RAMP C AND RAMP D, CITY OF 17 PITTSBURGH, BRIDGE REHABILITATION 350,000 18 (BASE PROJECT ALLOCATION - $350,000) 19 (8) SR 8059, RAMP B TO SR 0885 NORTHBOUND 20 OVER RAMP C AND RAMP D, CITY OF 21 PITTSBURGH, BRIDGE REHABILITATION 350,000 22 (BASE PROJECT ALLOCATION - $350,000) 23 (9) SR 8065, RAMP E ENTRANCE OVER B & O 24 RAILROAD, I-376, RAMP V, CITY OF 25 PITTSBURGH, BRIDGE REHABILITATION 1,010,000 26 (BASE PROJECT ALLOCATION - $1,000,000) 27 (DESIGN AND CONTINGENCIES - $10,000) 28 (10) SR 8065, RAMP F EXIT OVER CSX 29 RAILROAD, I-376, RAMP V, CITY OF 30 PITTSBURGH, BRIDGE REHABILITATION 1,010,000 20080S1503B2376 - 33 -
1 (BASE PROJECT ALLOCATION - $1,000,000) 2 (DESIGN AND CONTINGENCIES - $10,000) 3 (11) SR 2085 OVER 2ND AVENUE, PARKWAY 4 EAST, RAMP T, CITY OF PITTSBURGH, 5 BRIDGE REHABILITATION 1,010,000 6 (BASE PROJECT ALLOCATION - $1,000,000) 7 (DESIGN AND CONTINGENCIES - $10,000) 8 (12) I-279, BRIDGE NO.1068 OVER LR 805, 9 RAMP J, HOV LANE, CITY OF PITTSBURGH, 10 BRIDGE REHABILITATION 554,000 11 (BASE PROJECT ALLOCATION - $528,000) 12 (DESIGN AND CONTINGENCIES - $26,000) 13 (13) I-279, BRIDGE NO.1069 OVER SR 4003, 14 SR 4009, RAMP J, CITY OF PITTSBURGH, 15 BRIDGE REHABILITATION 131,000 16 (BASE PROJECT ALLOCATION - $125,000) 17 (DESIGN AND CONTINGENCIES - $6,000) 18 (14) I-279, BRIDGE NO.2032 OVER LR 805, 19 RAMP J, LR 2302, CITY OF PITTSBURGH, 20 BRIDGE REHABILITATION 207,000 21 (BASE PROJECT ALLOCATION - $197,000) 22 (DESIGN AND CONTINGENCIES - $10,000) 23 (15) I-279 NORTHBOUND OVER SUFFOLK STREET, 24 CITY OF PITTSBURGH, BRIDGE 25 REHABILITATION 231,000 26 (BASE PROJECT ALLOCATION - $220,000) 27 (DESIGN AND CONTINGENCIES - $11,000) 28 (16) SR 8102, I-279 AND MCKNIGHT ROAD, 29 RAMP I OVER LR 805, EVERGREEN ROAD, 30 CITY OF PITTSBURGH, BRIDGE 20080S1503B2376 - 34 -
1 REHABILITATION 70,000 2 (BASE PROJECT ALLOCATION - $66,000) 3 (DESIGN AND CONTINGENCIES - $4,000) 4 (17) SR 8102, I-279 AND MCKNIGHT ROAD, 5 RAMP J OVER SR 4003, EVERGREEN ROAD, 6 CITY OF PITTSBURGH, BRIDGE 7 REHABILITATION 81,000 8 (BASE PROJECT ALLOCATION - $77,000) 9 (DESIGN AND CONTINGENCIES - $4,000) 10 (18) SR 8102, I-279 AND MCKNIGHT ROAD, 11 RAMP Q OVER I-279, RAMP S, HOV LANE, 12 CITY OF PITTSBURGH, BRIDGE 13 REHABILITATION 38,000 14 (BASE PROJECT ALLOCATION - $36,000) 15 (DESIGN AND CONTINGENCIES - $2,000) 16 (19) SR 8102, I-279 AND MCKNIGHT ROAD, 17 RAMP S OVER LR 805, LR AND LR02302, 18 BRIDGE REHABILITATION 297,000 19 (BASE PROJECT ALLOCATION - $283,000) 20 (DESIGN AND CONTINGENCIES - $14,000) 21 (20) SR 6279 HOV LANE BRIDGE NO.2030 OVER 22 FOUR CITY STREETS, FEDERAL TO ANDERSON, 23 CITY OF PITTSBURGH, BRIDGE 24 REHABILITATION 63,000 25 (BASE PROJECT ALLOCATION - $60,000) 26 (DESIGN AND CONTINGENCIES - $3,000) 27 (21) TRIPOLI STREET OVER I-279, I-579, HOV 28 LANE, CITY OF PITTSBURGH, BRIDGE 29 REHABILITATION 41,000 30 (BASE PROJECT ALLOCATION - $39,000) 20080S1503B2376 - 35 -
1 (DESIGN AND CONTINGENCIES - $2,000) 2 (22) SR 3031, PRESLEY ROAD OVER CHARTIERS 3 CREEK, COLLIER TOWNSHIP, 4 BRIDGE REHABILITATION 280,000 5 (BASE PROJECT ALLOCATION - $200,000) 6 (LAND ALLOCATION - $40,000) 7 (DESIGN AND CONTINGENCIES - $40,000) 8 (23) SR 1001, BRIDGE STREET OVER PINE 9 CREEK, ETNA BOROUGH, BRIDGE 10 REHABILITATION 280,000 11 (BASE PROJECT ALLOCATION - $200,000) 12 (LAND ALLOCATION - $40,000) 13 (DESIGN AND CONTINGENCIES - $40,000) 14 (24) SR 1028, BAKERSTOWN ROAD OVER BULL 15 CREEK, FAWN TOWNSHIP, BRIDGE 16 REPLACEMENT 473,000 17 (BASE PROJECT ALLOCATION - $367,000) 18 (LAND ALLOCATION - $18,000) 19 (DESIGN AND CONTINGENCIES - $88,000) 20 (25) SR 3078, BURGETTSTOWN ROAD OVER NORTH 21 BRANCH OF MONTOUR RUN, FINDLAY 22 TOWNSHIP, BRIDGE REHABILITATION 958,000 23 (BASE PROJECT ALLOCATION - $938,000) 24 (DESIGN AND CONTINGENCIES - $20,000) 25 (26) SR 4043, BIG SEWICKLEY ROAD OVER 26 BRANCH OF BIG SEWICKLEY CREEK, FRANKLIN 27 PARK BOROUGH, BRIDGE REPLACEMENT 473,000 28 (BASE PROJECT ALLOCATION - $367,000) 29 (LAND ALLOCATION - $18,000) 30 (DESIGN AND CONTINGENCIES - $88,000) 20080S1503B2376 - 36 -
1 (27) SR 0008, WILLIAM FLYNN HIGHWAY OVER 2 GOURDHEAD RUN, HAMPTON TOWNSHIP, BRIDGE 3 REHABILITATION 958,000 4 (BASE PROJECT ALLOCATION - $938,000) 5 (DESIGN AND CONTINGENCIES - $20,000) 6 (28) SR 1001, FREEPORT ROAD OVER BARGE 7 BASIN, HARMAR TOWNSHIP, BRIDGE 8 REHABILITATION 280,000 9 (BASE PROJECT ALLOCATION - $200,000) 10 (LAND ALLOCATION - $40,000) 11 (DESIGN AND CONTINGENCIES - $40,000) 12 (29) SR 1032, BURTNER ROAD OVER LITTLE 13 BULL CREEK, HARRISON TOWNSHIP, BRIDGE 14 REHABILITATION 150,000 15 (BASE PROJECT ALLOCATION - $120,000) 16 (LAND ALLOCATION - $10,000) 17 (DESIGN AND CONTINGENCIES - $20,000) 18 (30) SR 1013, SAXONBURG BOULEVARD OVER 19 DEER CREEK, INDIANA TOWNSHIP, BRIDGE 20 REPLACEMENT 452,000 21 (BASE PROJECT ALLOCATION - $350,000) 22 (LAND ALLOCATION - $18,000) 23 (DESIGN AND CONTINGENCIES - $84,000) 24 (31) SR 1013 OVER LITTLE PINE CREEK, 25 INDIANA TOWNSHIP, BRIDGE REPLACEMENT 452,000 26 (BASE PROJECT ALLOCATION - $350,000) 27 (LAND ALLOCATION - $18,000) 28 (DESIGN AND CONTINGENCIES - $84,000) 29 (32) SR 3021, WALTON ROAD OVER LOBBS RUN, 30 JEFFERSON HILLS BOROUGH, BRIDGE 20080S1503B2376 - 37 -
1 REHABILITATION 958,000 2 (BASE PROJECT ALLOCATION - $938,000) 3 (DESIGN AND CONTINGENCIES - $20,000) 4 (33) SR 4048, GRUBBS ROAD OVER PINE CREEK, 5 MCCANDLESS TOWNSHIP, BRIDGE 6 REHABILITATION 958,000 7 (BASE PROJECT ALLOCATION - $938,000) 8 (DESIGN AND CONTINGENCIES - $20,000) 9 (34) SR 0978, BATTLE RIDGE OVER DOLPHIN 10 RUN, MCDONALD BOROUGH, BRIDGE 11 REHABILITATION 958,000 12 (BASE PROJECT ALLOCATION - $938,000) 13 (DESIGN AND CONTINGENCIES - $20,000) 14 (35) SR 3077, BRODHEAD ROAD OVER BOGGS 15 RUN, MOON TOWNSHIP, BRIDGE REPLACEMENT 473,000 16 (BASE PROJECT ALLOCATION - $367,000) 17 (LAND ALLOCATION - $18,000) 18 (DESIGN AND CONTINGENCIES - $88,000) 19 (36) SR 3048, NOBLESTOWN ROAD OVER BRANCH 20 OF ROBINSON RUN, NORTH FAYETTE 21 TOWNSHIP, BRIDGE REHABILITATION 601,000 22 (BASE PROJECT ALLOCATION - $200,000) 23 (LAND ALLOCATION - $63,000) 24 (DESIGN AND CONTINGENCIES - $338,000) 25 (37) SR 3121 OVER ABANDONED MONTOUR 26 RAILROAD, NORTH FAYETTE TOWNSHIP, 27 BRIDGE REPLACEMENT 473,000 28 (BASE PROJECT ALLOCATION - $367,000) 29 (LAND ALLOCATION - $18,000) 30 (DESIGN AND CONTINGENCIES - $88,000) 20080S1503B2376 - 38 -
1 (38) SR 2080, PLUM AVENUE OVER PLUM CREEK, 2 OAKMONT BOROUGH, BRIDGE REHABILITATION 280,000 3 (BASE PROJECT ALLOCATION - $200,000) 4 (LAND ALLOCATION - $40,000) 5 (DESIGN AND CONTINGENCIES - $40,000) 6 (39) SR 1002 OVER TRIBUTARY OF ALLEGHENY 7 RIVER, O'HARA TOWNSHIP, BRIDGE 8 REHABILITATION 233,000 9 (BASE PROJECT ALLOCATION - $213,000) 10 (DESIGN AND CONTINGENCIES - $20,000) 11 (40) SR 2058, HULTON ROAD OVER PLUM CREEK, 12 PENN HILLS TOWNSHIP, BRIDGE 13 REHABILITATION 150,000 14 (BASE PROJECT ALLOCATION - $120,000) 15 (LAND ALLOCATION - $10,000) 16 (DESIGN AND CONTINGENCIES - $20,000) 17 (41) SR 0910, SALEM HOLLOW ROAD OVER 18 BRANCH OF NORTH FORK OF PINE CREEK, 19 PINE TOWNSHIP, BRIDGE REHABILITATION 958,000 20 (BASE PROJECT ALLOCATION - $938,000) 21 (DESIGN AND CONTINGENCIES - $20,000) 22 (42) SR 0051, AT INTERSECTION OF SR 2032 23 BRIDGE NO.730 OVER LEWIS RUN, PLEASANT 24 HILLS BOROUGH, BRIDGE REPLACEMENT 452,000 25 (BASE PROJECT ALLOCATION - $350,000) 26 (LAND ALLOCATION - $18,000) 27 (DESIGN AND CONTINGENCIES - $84,000) 28 (43) SR 0051, BRIDGE NO.729 OVER LEWIS 29 RUN, PLEASANT HILLS BOROUGH, BRIDGE 30 REPLACEMENT 452,000 20080S1503B2376 - 39 -
1 (BASE PROJECT ALLOCATION - $350,000) 2 (LAND ALLOCATION - $18,000) 3 (DESIGN AND CONTINGENCIES - $84,000) 4 (44) I-279, BRIDGE NO.1078 OVER I-279, HOV 5 LANE, ROSS TOWNSHIP, BRIDGE 6 REHABILITATION 52,000 7 (BASE PROJECT ALLOCATION - $49,000) 8 (DESIGN AND CONTINGENCIES - $3,000) 9 (45) PERRYSVILLE AVENUE RAMP OVER LR 1021, 10 I-279, HOV LANES, ROSS TOWNSHIP, BRIDGE 11 REHABILITATION 153,000 12 (BASE PROJECT ALLOCATION - $146,000) 13 (DESIGN AND CONTINGENCIES - $7,000) 14 (46) UNION AVENUE OVER I-279, ROSS 15 TOWNSHIP, BRIDGE REHABILITATION 190,000 16 (BASE PROJECT ALLOCATION - $181,000) 17 (DESIGN AND CONTINGENCIES - $9,000) 18 (47) SR 4009, BABCOCK BOULEVARD OVER 19 GIRTYS RUN, SHALER TOWNSHIP, BRIDGE 20 REPLACEMENT 3,000,000 21 (BASE PROJECT ALLOCATION - $3,000,000) 22 (48) SR 3028, PRESTO-SYGAN ROAD OVER 23 THOMAS RUN ROAD, SOUTH FAYETTE 24 TOWNSHIP, BRIDGE REHABILITATION 150,000 25 (BASE PROJECT ALLOCATION - $120,000) 26 (LAND ALLOCATION - $10,000) 27 (DESIGN AND CONTINGENCIES - $20,000) 28 (49) SR 3002, COUNTRY CLUB OVER SR 0019, 29 UPPER ST. CLAIR TOWNSHIP, BRIDGE 30 REPLACEMENT 473,000 20080S1503B2376 - 40 -
1 (BASE PROJECT ALLOCATION - $367,000) 2 (LAND ALLOCATION - $18,000) 3 (DESIGN AND CONTINGENCIES - $88,000) 4 (50) SR 0837, EIGHTH AVENUE OVER BALDWIN 5 ROAD, WEST HOMESTEAD BOROUGH, BRIDGE 6 REHABILITATION 350,000 7 (BASE PROJECT ALLOCATION - $350,000) 8 (51) SR 2031, LINCOLN WAY OVER LONG RUN, 9 WHITE OAK BOROUGH, BRIDGE 10 REHABILITATION 958,000 11 (BASE PROJECT ALLOCATION - $938,000) 12 (DESIGN AND CONTINGENCIES - $20,000) 13 (52) SR 4017, LITTLE PINE CREEK ROAD, OVER 14 WEST BRANCH OF PINE CREEK, SHALER 15 TOWNSHIP, BRIDGE REHABILITATION 750,000 16 (BASE PROJECT ALLOCATION - $750,000) 17 (53) SR 1028, BAKERSVILLE CULMERVILLE 18 ROAD, OVER RAILROAD TRACKS, WEST DEER 19 TOWNSHIP, BRIDGE REPLACEMENT 2,300,000 20 (BASE PROJECT ALLOCATION - $2,300,000) 21 (54) SR 1022, OAK ROAD, OVER DEER CREEK, 22 WEST DEER TOWNSHIP, BRIDGE REPLACEMENT 150,000 23 (BASE PROJECT ALLOCATION - $150,000) 24 (55) SR 1015, LITTLE DEER CREEK ROAD, OVER 25 B&LE RAILROAD BRIDGE OVER SR 1015, 26 RURAL RIDGE TUNNEL, WEST DEER/INDIANA 27 TOWNSHIP BORDER, BRIDGE REPLACEMENT 2,400,000 28 (BASE PROJECT ALLOCATION - $2,400,000) 29 (56) SR 4068, PINE CREEK ROAD, OVER PINE 30 CREEK, MCCANDLESS TOWNSHIP, BRIDGE 20080S1503B2376 - 41 -
1 REPLACEMENT 1,500,000 2 (BASE PROJECT ALLOCATION - $1,500,000) 3 SECTION 7. ARMSTRONG COUNTY. 4 (A) LOCAL BRIDGES 5 (1) WAYNE TOWNSHIP, T-738 OVER SOUTH FORK 6 PINE CREEK, BRIDGE REPLACEMENT 500,000 7 (BASE PROJECT ALLOCATION - $500,000) 8 (2) PLUMCREEK TOWNSHIP, T-688 OVER SOUTH 9 BRANCH PLUM CREEK, BRIDGE 10 REHABILITATION 100,000 11 (BASE PROJECT ALLOCATION - $100,000) 12 (3) MADISON TOWNSHIP, T-468 OVER RED BANK 13 CREEK, BRIDGE REHABILITATION 100,000 14 (BASE PROJECT ALLOCATION - $100,000) 15 (4) EAST FRANKLIN TOWNSHIP, T-763 OVER 16 SR0422, BRIDGE REHABILITATION 100,000 17 (BASE PROJECT ALLOCATION - $100,000) 18 (5) COWANSHANNOCK TOWNSHIP, T-761 OVER 19 COWANSHANNOCK CREEK, BRIDGE 20 REHABILITATION 100,000 21 (BASE PROJECT ALLOCATION - $100,000) 22 (B) STATE BRIDGES 23 (1) SR 2028 OVER MYERS RUN, BURRELL 24 TOWNSHIP, BRIDGE REPLACEMENT 249,000 25 (BASE PROJECT ALLOCATION - $69,000) 26 (LAND ALLOCATION - $40,000) 27 (DESIGN AND CONTINGENCIES - $140,000) 28 (2) SR 0085, BRIDGE NO.3034 OVER TRIBUTARY 29 OF COWANSHANNOCK CREEK, COWANSHANNOCK 30 TOWNSHIP, BRIDGE REPLACEMENT 322,000 20080S1503B2376 - 42 -
1 (BASE PROJECT ALLOCATION - $142,000) 2 (LAND ALLOCATION - $40,000) 3 (DESIGN AND CONTINGENCIES - $140,000) 4 (3) SR 0085, BRIDGE NO.3036 OVER TRIBUTARY 5 OF COWANSHANNOCK CREEK, COWANSHANNOCK 6 TOWNSHIP, BRIDGE REPLACEMENT 283,000 7 (BASE PROJECT ALLOCATION - $103,000) 8 (LAND ALLOCATION - $40,000) 9 (DESIGN AND CONTINGENCIES - $140,000) 10 (4) SR 1028 OVER TRIBUTARY OF PINE CREEK, 11 COWANSHANNOCK TOWNSHIP, BRIDGE 12 REPLACEMENT 208,000 13 (BASE PROJECT ALLOCATION - $28,000) 14 (LAND ALLOCATION - $40,000) 15 (DESIGN AND CONTINGENCIES - $140,000) 16 (5) SR 1037 OVER SCHRECONGOST RUN, 17 COWANSHANNOCK TOWNSHIP, BRIDGE 18 REPLACEMENT 213,000 19 (BASE PROJECT ALLOCATION - $33,000) 20 (LAND ALLOCATION - $40,000) 21 (DESIGN AND CONTINGENCIES - $140,000) 22 (6) SR 1039 OVER SOUTH BRANCH OF SOUTH 23 FORK OF PINE CREEK, COWANSHANNOCK 24 TOWNSHIP, BRIDGE REPLACEMENT 235,000 25 (BASE PROJECT ALLOCATION - $150,000) 26 (LAND ALLOCATION - $15,000) 27 (DESIGN AND CONTINGENCIES - $70,000) 28 (7) SR 1039 OVER TRIBUTARY OF SOUTH BRANCH 29 OF SOUTH FORK OF PINE CREEK, 30 COWANSHANNOCK TOWNSHIP, BRIDGE 20080S1503B2376 - 43 -
1 REPLACEMENT 195,000 2 (BASE PROJECT ALLOCATION - $150,000) 3 (LAND ALLOCATION - $15,000) 4 (DESIGN AND CONTINGENCIES - $30,000) 5 (8) SR 4006 OVER GLADE RUN, EAST FRANKLIN 6 TOWNSHIP, BRIDGE REPLACEMENT 235,000 7 (BASE PROJECT ALLOCATION - $150,000) 8 (LAND ALLOCATION - $15,000) 9 (DESIGN AND CONTINGENCIES - $70,000) 10 (9) SR 4008 OVER GLADE RUN, EAST FRANKLIN 11 TOWNSHIP, BRIDGE REPLACEMENT 263,000 12 (BASE PROJECT ALLOCATION - $83,000) 13 (LAND ALLOCATION - $40,000) 14 (DESIGN AND CONTINGENCIES - $140,000) 15 (10) SR 2040 OVER FLAT RUN, KISKIMINETAS 16 TOWNSHIP, BRIDGE REPLACEMENT 224,000 17 (BASE PROJECT ALLOCATION - $44,000) 18 (LAND ALLOCATION - $40,000) 19 (DESIGN AND CONTINGENCIES - $140,000) 20 (11) SR 2052 OVER TRIBUTARY OF RATTLING 21 RUN, KISKIMINETAS TOWNSHIP, BRIDGE 22 REPLACEMENT 214,000 23 (BASE PROJECT ALLOCATION - $34,000) 24 (LAND ALLOCATION - $40,000) 25 (DESIGN AND CONTINGENCIES - $140,000) 26 (12) SR 2015 OVER THOMAS RUN, KITTANNING 27 TOWNSHIP, BRIDGE REPLACEMENT 242,000 28 (BASE PROJECT ALLOCATION - $62,000) 29 (LAND ALLOCATION - $40,000) 30 (DESIGN AND CONTINGENCIES - $140,000) 20080S1503B2376 - 44 -
1 (13) SR 1010 OVER MAHONING CREEK, MAHONING 2 TOWNSHIP, BRIDGE REPLACEMENT 1,972,000 3 (BASE PROJECT ALLOCATION - $1,792,000) 4 (LAND ALLOCATION - $40,000) 5 (DESIGN AND CONTINGENCIES - $140,000) 6 (14) SR 0066 OVER TUB MILL RUN, MANOR 7 TOWNSHIP, BRIDGE REPLACEMENT 260,000 8 (BASE PROJECT ALLOCATION - $80,000) 9 (LAND ALLOCATION - $40,000) 10 (DESIGN AND CONTINGENCIES - $140,000) 11 (15) SR 2010 OVER GARRETTS RUN, MANOR 12 TOWNSHIP, BRIDGE REHABILITATION 195,000 13 (BASE PROJECT ALLOCATION - $150,000) 14 (LAND ALLOCATION - $15,000) 15 (DESIGN AND CONTINGENCIES - $30,000) 16 (16) SR 2025 OVER GARRETTS RUN, MANOR 17 TOWNSHIP, BRIDGE REPLACEMENT 258,000 18 (BASE PROJECT ALLOCATION - $78,000) 19 (LAND ALLOCATION - $40,000) 20 (DESIGN AND CONTINGENCIES - $140,000) 21 (17) SR 3007 OVER TRIBUTARY OF GLADE RUN, 22 NORTH BUFFALO TOWNSHIP, BRIDGE 23 REPLACEMENT 250,000 24 (BASE PROJECT ALLOCATION - $70,000) 25 (LAND ALLOCATION - $40,000) 26 (DESIGN AND CONTINGENCIES - $140,000) 27 (18) SR 3011 OVER TRIBUTARY OF MARROWBONE 28 RUN, NORTH BUFFALO TOWNSHIP, BRIDGE 29 REPLACEMENT 220,000 30 (BASE PROJECT ALLOCATION - $40,000) 20080S1503B2376 - 45 -
1 (LAND ALLOCATION - $40,000) 2 (DESIGN AND CONTINGENCIES - $140,000) 3 (19) SR 3017 OVER GLADE RUN, NORTH BUFFALO 4 TOWNSHIP, BRIDGE REPLACEMENT 486,000 5 (BASE PROJECT ALLOCATION - $306,000) 6 (LAND ALLOCATION - $40,000) 7 (DESIGN AND CONTINGENCIES - $140,000) 8 (20) SR 0066 OVER CARNAHAN RUN, PARKS 9 TOWNSHIP, BRIDGE REPLACEMENT 448,000 10 (BASE PROJECT ALLOCATION - $268,000) 11 (LAND ALLOCATION - $40,000) 12 (DESIGN AND CONTINGENCIES - $140,000) 13 (21) SR 2059 OVER GUFFY RUN, PARKS 14 TOWNSHIP, BRIDGE REPLACEMENT 300,000 15 (BASE PROJECT ALLOCATION - $120,000) 16 (LAND ALLOCATION - $40,000) 17 (DESIGN AND CONTINGENCIES - $140,000) 18 (22) SR 2066 OVER STITTS RUN, PARKS 19 TOWNSHIP, BRIDGE REPLACEMENT 279,000 20 (BASE PROJECT ALLOCATION - $99,000) 21 (LAND ALLOCATION - $40,000) 22 (DESIGN AND CONTINGENCIES - $140,000) 23 (23) SR 2066 OVER TRIBUTARY OF CARNAHAN 24 RUN, PARKS TOWNSHIP, BRIDGE 25 REPLACEMENT 210,000 26 (BASE PROJECT ALLOCATION - $30,000) 27 (LAND ALLOCATION - $40,000) 28 (DESIGN AND CONTINGENCIES - $140,000) 29 (24) SR 1030, BRIDGE NO.3138 OVER WHISKY 30 HOLLOW RUN, PINE TOWNSHIP, BRIDGE 20080S1503B2376 - 46 -
1 REPLACEMENT 206,000 2 (BASE PROJECT ALLOCATION - $26,000) 3 (LAND ALLOCATION - $40,000) 4 (DESIGN AND CONTINGENCIES - $140,000) 5 (25) SR 1030, BRIDGE NO.3139 OVER WHISKY 6 HOLLOW RUN, PINE TOWNSHIP, BRIDGE 7 REPLACEMENT 254,000 8 (BASE PROJECT ALLOCATION - $74,000) 9 (LAND ALLOCATION - $40,000) 10 (DESIGN AND CONTINGENCIES - $140,000) 11 (26) SR 2003 OVER TRIBUTARY OF CESSNA RUN, 12 PLUMCREEK TOWNSHIP, BRIDGE REPLACEMENT 257,000 13 (BASE PROJECT ALLOCATION - $77,000) 14 (LAND ALLOCATION - $40,000) 15 (DESIGN AND CONTINGENCIES - $140,000) 16 (27) SR 2005 OVER CHERRY RUN, PLUMCREEK 17 TOWNSHIP, BRIDGE REPLACEMENT 410,000 18 (BASE PROJECT ALLOCATION - $230,000) 19 (LAND ALLOCATION - $40,000) 20 (DESIGN AND CONTINGENCIES - $140,000) 21 (28) SR 1036 OVER COWANSHANNOCK CREEK, 22 RAYBURN TOWNSHIP, BRIDGE REPLACEMENT 740,000 23 (BASE PROJECT ALLOCATION - $560,000) 24 (LAND ALLOCATION - $40,000) 25 (DESIGN AND CONTINGENCIES - $140,000) 26 (29) SR 1017 OVER BRANCH OF REDBANK CREEK, 27 REDBANK TOWNSHIP, BRIDGE REPLACEMENT 227,000 28 (BASE PROJECT ALLOCATION - $47,000) 29 (LAND ALLOCATION - $40,000) 30 (DESIGN AND CONTINGENCIES - $140,000) 20080S1503B2376 - 47 -
1 (30) SR 1039 OVER TRIBUTARY OF CRAIGS RUN, 2 RURAL VALLEY BOROUGH, BRIDGE 3 REPLACEMENT 234,000 4 (BASE PROJECT ALLOCATION - $54,000) 5 (LAND ALLOCATION - $40,000) 6 (DESIGN AND CONTINGENCIES - $140,000) 7 (31) SR 2001 OVER TRIBUTARY OF 8 COWANSHANNOCK CREEK, RURAL VALLEY 9 BOROUGH, BRIDGE REPLACEMENT 253,000 10 (BASE PROJECT ALLOCATION - $73,000) 11 (LAND ALLOCATION - $40,000) 12 (DESIGN AND CONTINGENCIES - $140,000) 13 (32) SR 2026 OVER FAGLEY RUN, SOUTH BEND 14 TOWNSHIP, BRIDGE REPLACEMENT 245,000 15 (BASE PROJECT ALLOCATION - $65,000) 16 (LAND ALLOCATION - $40,000) 17 (DESIGN AND CONTINGENCIES - $140,000) 18 (33) SR 0128, BRIDGE NO.3289 OVER 19 TRIBUTARY OF PINE RUN, SOUTH BUFFALO 20 TOWNSHIP, BRIDGE REPLACEMENT 252,000 21 (BASE PROJECT ALLOCATION - $72,000) 22 (LAND ALLOCATION - $40,000) 23 (DESIGN AND CONTINGENCIES - $140,000) 24 (34) SR 0128, BRIDGE NO.3290 OVER 25 TRIBUTARY OF PINE RUN, SOUTH BUFFALO 26 TOWNSHIP, BRIDGE REPLACEMENT 288,000 27 (BASE PROJECT ALLOCATION - $108,000) 28 (LAND ALLOCATION - $40,000) 29 (DESIGN AND CONTINGENCIES - $140,000) 30 (35) SR 0128, BRIDGE NO.3291 OVER 20080S1503B2376 - 48 -
1 TRIBUTARY OF PINE RUN, SOUTH BUFFALO 2 TOWNSHIP, BRIDGE REPLACEMENT 206,000 3 (BASE PROJECT ALLOCATION - $26,000) 4 (LAND ALLOCATION - $40,000) 5 (DESIGN AND CONTINGENCIES - $140,000) 6 (36) SR 0085, BRIDGE NO.3026 OVER 7 TRIBUTARY OF COWANSHANNOCK CREEK, 8 VALLEY TOWNSHIP, BRIDGE REPLACEMENT 209,000 9 (BASE PROJECT ALLOCATION - $29,000) 10 (LAND ALLOCATION - $40,000) 11 (DESIGN AND CONTINGENCIES - $140,000) 12 (37) SR 4017 OVER TRIBUTARY OF HULING RUN, 13 WASHINGTON TOWNSHIP, BRIDGE 14 REPLACEMENT 242,000 15 (BASE PROJECT ALLOCATION - $62,000) 16 (LAND ALLOCATION - $40,000) 17 (DESIGN AND CONTINGENCIES - $140,000) 18 (38) SR 4017, BRIDGE NO.3323 OVER 19 TRIBUTARY OF LIMESTONE RUN, WASHINGTON 20 TOWNSHIP, BRIDGE REPLACEMENT 227,000 21 (BASE PROJECT ALLOCATION - $47,000) 22 (LAND ALLOCATION - $40,000) 23 (DESIGN AND CONTINGENCIES - $140,000) 24 (39) SR 4017, BRIDGE NO.3324 OVER 25 TRIBUTARY OF LIMESTONE RUN, WASHINGTON 26 TOWNSHIP, BRIDGE REPLACEMENT 227,000 27 (BASE PROJECT ALLOCATION - $47,000) 28 (LAND ALLOCATION - $40,000) 29 (DESIGN AND CONTINGENCIES - $140,000) 30 (40) SR 1018 OVER BRANCH OF PINE CREEK, 20080S1503B2376 - 49 -
1 WAYNE TOWNSHIP, BRIDGE REPLACEMENT 227,000 2 (BASE PROJECT ALLOCATION - $47,000) 3 (LAND ALLOCATION - $40,000) 4 (DESIGN AND CONTINGENCIES - $140,000) 5 (41) SR 1020 OVER BRANCH OF PINE CREEK, 6 WAYNE TOWNSHIP, BRIDGE REPLACEMENT 233,000 7 (BASE PROJECT ALLOCATION - $53,000) 8 (LAND ALLOCATION - $40,000) 9 (DESIGN AND CONTINGENCIES - $140,000) 10 SECTION 8. BEAVER COUNTY. 11 (A) LOCAL BRIDGES (RESERVED) 12 (B) STATE BRIDGES 13 (1) SR 0051, CONSTITUTION BOULEVARD OVER 14 CREEK, CITY OF ALIQUIPPA, BRIDGE 15 REHABILITATION 601,000 16 (BASE PROJECT ALLOCATION - $200,000) 17 (LAND ALLOCATION - $63,000) 18 (DESIGN AND CONTINGENCIES - $338,000) 19 (2) SR 0288, ZELIENOPLE OVER CAMP RUN, 20 FRANKLIN TOWNSHIP, BRIDGE REPLACEMENT 256,000 21 (BASE PROJECT ALLOCATION - $200,000) 22 (LAND ALLOCATION - $15,000) 23 (DESIGN AND CONTINGENCIES - $41,000) 24 (3) SR 3027, GEORGETOWN ROAD OVER MILL 25 CREEK, GREENE TOWNSHIP, BRIDGE 26 REPLACEMENT 8,800,000 27 (BASE PROJECT ALLOCATION - $8,000,000) 28 (DESIGN AND CONTINGENCIES - $800,000) 29 (4) SR 3018, MCCLEARY ROAD OVER BRANCH OF 30 MILL CREEK, GREENE TOWNSHIP, BRIDGE 20080S1503B2376 - 50 -
1 REHABILITATION 233,000 2 (BASE PROJECT ALLOCATION - $213,000) 3 (DESIGN AND CONTINGENCIES - $20,000) 4 (5) SR 3032, KENDALL ROAD OVER LITTLE 5 SERVICE RUN, HANOVER TOWNSHIP, BRIDGE 6 REPLACEMENT 1,000,000 7 (BASE PROJECT ALLOCATION - $1,000,000) 8 (6) SR 0151, BOCKTOWN ROAD OVER RAREDON 9 RUN, INDEPENDENCE TOWNSHIP, BRIDGE 10 REPLACEMENT 1,000,000 11 (BASE PROJECT ALLOCATION - $1,000,000) 12 (7) SR 4034, WOLF RUN ROAD OVER WOLF RUN, 13 INDUSTRY BOROUGH, BRIDGE 14 REHABILITATION 871,000 15 (BASE PROJECT ALLOCATION - $770,000) 16 (LAND ALLOCATION - $3,000) 17 (DESIGN AND CONTINGENCIES - $98,000) 18 (8) SR 1015, HARTZEL SCHOOL OVER 19 CONNOQUENESSING CREEK, MARION TOWNSHIP, 20 BRIDGE REPLACEMENT 2,000,000 21 (BASE PROJECT ALLOCATION - $2,000,000) 22 (9) SR 0068, SUNFLOWER ROAD OVER BRUSH 23 CREEK, NEW SEWICKLEY TOWNSHIP, BRIDGE 24 REHABILITATION 1,090,000 25 (BASE PROJECT ALLOCATION - $963,000) 26 (LAND ALLOCATION - $4,000) 27 (DESIGN AND CONTINGENCIES - $123,000) 28 (10) SR 0168, TUSCARAWAS ROAD OVER BEALER 29 RUN, OHIOVILLE BOROUGH, BRIDGE 30 REHABILITATION 233,000 20080S1503B2376 - 51 -
1 (BASE PROJECT ALLOCATION - $213,000) 2 (DESIGN AND CONTINGENCIES - $20,000) 3 (11) SR 4033, WILDWOOD ROAD OVER BRADY 4 RUN, PATTERSON TOWNSHIP, BRIDGE 5 REHABILITATION 233,000 6 (BASE PROJECT ALLOCATION - $213,000) 7 (DESIGN AND CONTINGENCIES - $20,000) 8 SECTION 9. BEDFORD COUNTY. 9 (A) LOCAL BRIDGES (RESERVED) 10 (B) STATE BRIDGES 11 (1) SR 1014 OVER DUNNINGS CREEK, BEDFORD 12 TOWNSHIP, BRIDGE REHABILITATION 372,000 13 (BASE PROJECT ALLOCATION - $372,000) 14 (2) PA 915 OVER SANDY RUN, BROAD TOP 15 TOWNSHIP, BRIDGE REHABILITATION 279,000 16 (BASE PROJECT ALLOCATION - $279,000) 17 (3) SR 3009 OVER TRIBUTARY OF EVITTS 18 CREEK, CUMBERLAND VALLEY TOWNSHIP, 19 BRIDGE REHABILITATION 52,000 20 (BASE PROJECT ALLOCATION - $36,000) 21 (LAND ALLOCATION - $1,000) 22 (DESIGN AND CONTINGENCIES - $15,000) 23 (4) SR 3017 OVER COVE RUN, HARRISON 24 TOWNSHIP, BRIDGE REHABILITATION 130,000 25 (BASE PROJECT ALLOCATION - $130,000) 26 (5) SR 3001, CREEK ROAD OVER GLADDENS RUN, 27 LONDONDERRY TOWNSHIP, BRIDGE 28 REHABILITATION 461,000 29 (BASE PROJECT ALLOCATION - $461,000) 30 (6) SR 3001, CREEK ROAD OVER WILLS CREEK, 20080S1503B2376 - 52 -
1 LONDONDERRY TOWNSHIP, BRIDGE 2 REHABILITATION 569,000 3 (BASE PROJECT ALLOCATION - $569,000) 4 (7) SR 3004 OVER WILLS CREEK, LONDONDERRY 5 TOWNSHIP, BRIDGE REHABILITATION 422,000 6 (BASE PROJECT ALLOCATION - $422,000) 7 (8) SR 0096 OVER DUNNING CREEK, NAPIER 8 TOWNSHIP, BRIDGE REPLACEMENT 642,000 9 (BASE PROJECT ALLOCATION - $494,000) 10 (LAND ALLOCATION - $20,000) 11 (DESIGN AND CONTINGENCIES - $128,000) 12 (9) SR 0869 OVER WALLACHS BRANCH, PAVIA 13 TOWNSHIP, BRIDGE REHABILITATION 708,000 14 (BASE PROJECT ALLOCATION - $708,000) 15 (10) SR 1007 OVER US 30, WEST PROVIDENCE 16 TOWNSHIP, BRIDGE RESTORATION 5,450,000 17 (BASE PROJECT ALLOCATION - $5,300,000) 18 (DESIGN AND CONTINGENCIES - $150,000) 19 SECTION 10. BERKS COUNTY. 20 (A) LOCAL BRIDGES 21 (1) PIKE TOWNSHIP, T-614 OVER PINE CREEK, 22 BRIDGE REPLACEMENT 141,000 23 (BASE PROJECT ALLOCATION - $111,000) 24 (LAND ALLOCATION - $15,000) 25 (DESIGN AND CONTINGENCIES - $15,000) 26 (2) ROBESON TOWNSHIP, T-344 OVER ALLEGHENY 27 CREEK, BRIDGE REPLACEMENT 91,000 28 (BASE PROJECT ALLOCATION - $53,000) 29 (LAND ALLOCATION - $8,000) 30 (DESIGN AND CONTINGENCIES - $30,000) 20080S1503B2376 - 53 -
1 (3) BIRDSBORO BOROUGH, FIRST STREET OVER 2 HAY CREEK, BRIDGE REHABILITATION 600,000 3 (BASE PROJECT ALLOCATION - $600,000) 4 (4) AMITY TOWNSHIP, T-463 OVER UNNAMED 5 WATERWAY, BRIDGE REPLACEMENT 150,000 6 (BASE PROJECT ALLOCATION - $150,000) 7 (B) STATE BRIDGES 8 (1) SR 2077, RIVER BRIDGE ROAD OVER 9 SCHUYLKILL RIVER, AMITY TOWNSHIP, 10 BRIDGE REHABILITATION 4,500,000 11 (BASE PROJECT ALLOCATION - $3,500,000) 12 (LAND ALLOCATION - $500,000) 13 (DESIGN AND CONTINGENCIES - $500,000) 14 (2) US 422 OVER BRENTWOOD DRIVE, CITY OF 15 READING, BRIDGE REHABILITATION 1,900,000 16 (BASE PROJECT ALLOCATION - $1,100,000) 17 (LAND ALLOCATION - $100,000) 18 (DESIGN AND CONTINGENCIES - $700,000) 19 (3) SR 3008, LR 06056 OVER SPRING CREEK, 20 NORTH HEIDELBERG TOWNSHIP, BRIDGE 21 REHABILITATION 1,184,000 22 (BASE PROJECT ALLOCATION - $1,184,000) 23 (4) PA 73 OVER MANATAWNY CREEK, OLEY 24 TOWNSHIP, BRIDGE REPLACEMENT 2,300,000 25 (BASE PROJECT ALLOCATION - $1,200,000) 26 (LAND ALLOCATION - $100,000) 27 (DESIGN AND CONTINGENCIES - $1,000,000) 28 (5) I-176, OVER SR 0422, CUMRU TOWNSHIP, 29 BRIDGE REHABILITATION 912,000 30 (BASE PROJECT ALLOCATION - $912,000) 20080S1503B2376 - 54 -
1 (6) SR 1021, OVER TRIBUTARY OF MILL CREEK, 2 MAXATAWNY TOWNSHIP, BRIDGE REPLACEMENT 732,000 3 (BASE PROJECT ALLOCATION - $420,000) 4 (LAND ALLOCATION - $26,000) 5 (DESIGN AND CONTINGENCIES - $286,000) 6 (7) SR 2047, OVER MONOCACY CREEK, AMITY 7 TOWNSHIP, BRIDGE REHABILITATION 3,000,000 8 (BASE PROJECT ALLOCATION - $3,000,000) 9 SECTION 11. BLAIR COUNTY. 10 (A) LOCAL BRIDGES (RESERVED) 11 (B) STATE BRIDGES 12 (1) SR 0022, BRIDGE NO.5519 OVER TR T-416, 13 ALLEGHENY TOWNSHIP, BRIDGE 14 REHABILITATION 433,000 15 (BASE PROJECT ALLOCATION - $433,000) 16 (2) SR 0022, BRIDGE NO.5521 OVER TR T-416, 17 ALLEGHENY TOWNSHIP, BRIDGE 18 REHABILITATION 433,000 19 (BASE PROJECT ALLOCATION - $433,000) 20 (3) SR 0022, BRIDGE NO.5524 OVER TR T-406, 21 ALLEGHENY TOWNSHIP, BRIDGE 22 REHABILITATION 433,000 23 (BASE PROJECT ALLOCATION - $433,000) 24 (4) SR0022, BRIDGE NO.5525 OVER SR 8004, 25 RAMP 13-C, TR 22 EASTBOUND, ALLEGHENY 26 TOWNSHIP, BRIDGE REHABILITATION 433,000 27 (BASE PROJECT ALLOCATION - $433,000) 28 (5) SR 0022, BRIDGE NO.5528 OVER US 22, 29 ALLEGHENY TOWNSHIP, BRIDGE 30 REHABILITATION 1,150,000 20080S1503B2376 - 55 -
1 (BASE PROJECT ALLOCATION - $1,050,000) 2 (DESIGN AND CONTINGENCIES - $100,000) 3 (6) SR 0022, BRIDGE NO.5529 OVER SR 8004 4 RAMPS, ALLEGHENY TOWNSHIP, BRIDGE 5 REHABILITATION 433,000 6 (BASE PROJECT ALLOCATION - $433,000) 7 (7) SR 0022, BRIDGE NO.5531 OVER PA 764 8 RAMPS, ALLEGHENY TOWNSHIP, BRIDGE 9 REHABILITATION 1,150,000 10 (BASE PROJECT ALLOCATION - $1,050,000) 11 (DESIGN AND CONTINGENCIES - $100,000) 12 (8) SR 0022, BRIDGE NO.5522 OVER TR T-406, 13 ALLEGHENY TOWNSHIP, BRIDGE 14 REHABILITATION 433,000 15 (BASE PROJECT ALLOCATION - $433,000) 16 (9) SR 1001 OVER LITTLE JUNIATA RIVER, 17 ANTIS TOWNSHIP, BRIDGE REPLACEMENT 880,000 18 (BASE PROJECT ALLOCATION - $769,000) 19 (LAND ALLOCATION - $18,000) 20 (DESIGN AND CONTINGENCIES - $93,000) 21 (10) SR 1001 OVER BRUSH RUN, CITY OF 22 ALTOONA, BRIDGE REPLACEMENT 275,000 23 (BASE PROJECT ALLOCATION - $275,000) 24 (11) SR 1009 OVER I-99 RAMPS AND US 220, 25 LOGAN TOWNSHIP, BRIDGE REHABILITATION 666,000 26 (BASE PROJECT ALLOCATION - $650,000) 27 (LAND ALLOCATION - $1,000) 28 (DESIGN AND CONTINGENCIES - $15,000) 29 (12) SR 8007 OVER SEDA-COG RAILROAD, 30 SNYDER TOWNSHIP, BRIDGE REHABILITATION 269,000 20080S1503B2376 - 56 -
1 (BASE PROJECT ALLOCATION - $269,000) 2 (13) SR 8007 OVER BALD EAGLE CREEK, SNYDER 3 TOWNSHIP, BRIDGE REHABILITATION 269,000 4 (BASE PROJECT ALLOCATION - $269,000) 5 (14) SR 0453 OVER BALD EAGLE CREEK, TYRONE 6 BOROUGH, BRIDGE REHABILITATION 650,000 7 (BASE PROJECT ALLOCATION - $650,000) 8 SECTION 12. BRADFORD COUNTY. 9 (A) LOCAL BRIDGES (RESERVED) 10 (B) STATE BRIDGES 11 (1) SR 3004 OVER LADDS CREEK, ALBANY 12 TOWNSHIP, BRIDGE REPLACEMENT 130,000 13 (BASE PROJECT ALLOCATION - $100,000) 14 (DESIGN AND CONTINGENCIES - $30,000) 15 (2) SR 0187 OVER ELLIS CREEK, ASYLUM 16 TOWNSHIP, BRIDGE REPLACEMENT 930,000 17 (BASE PROJECT ALLOCATION - $700,000) 18 (LAND ALLOCATION - $30,000) 19 (DESIGN AND CONTINGENCIES - $200,000) 20 (3) SR 0199 OVER CHEMUNG RIVER OVERFLOW 21 CHANNEL, ATHENS TOWNSHIP, BRIDGE 22 REHABILITATION 70,000 23 (LAND ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $50,000) 25 (4) SR 4022 OVER TRIBUTARY OF CHEMUNG 26 RIVER, ATHENS TOWNSHIP, BRIDGE 27 REPLACEMENT 260,000 28 (BASE PROJECT ALLOCATION - $180,000) 29 (DESIGN AND CONTINGENCIES - $80,000) 30 (5) SR 4002 OVER BROWNS CREEK, BURLINGTON 20080S1503B2376 - 57 -
1 TOWNSHIP, BRIDGE REPLACEMENT 1,660,000 2 (BASE PROJECT ALLOCATION - $1,300,000) 3 (LAND ALLOCATION - $30,000) 4 (DESIGN AND CONTINGENCIES - $330,000) 5 (6) SR 4033 OVER TRIBUTARY OF SUGAR CREEK, 6 COLUMBIA TOWNSHIP, BRIDGE REPLACEMENT 190,000 7 (BASE PROJECT ALLOCATION - $120,000) 8 (LAND ALLOCATION - $20,000) 9 (DESIGN AND CONTINGENCIES - $50,000) 10 (7) SR 4037 OVER TRIBUTARY OF SUGAR CREEK, 11 COLUMBIA TOWNSHIP, BRIDGE REPLACEMENT 150,000 12 (BASE PROJECT ALLOCATION - $120,000) 13 (DESIGN AND CONTINGENCIES - $30,000) 14 (8) SR 3013 OVER TRIBUTARY OF TOWANDA 15 CREEK, FRANKLIN TOWNSHIP, BRIDGE 16 REPLACEMENT 220,000 17 (BASE PROJECT ALLOCATION - $120,000) 18 (LAND ALLOCATION - $20,000) 19 (DESIGN AND CONTINGENCIES - $80,000) 20 (9) SR 0414 OVER TRIBUTARY OF TOWANDA 21 CREEK, LEROY TOWNSHIP, BRIDGE 22 REPLACEMENT 1,540,000 23 (BASE PROJECT ALLOCATION - $1,400,000) 24 (LAND ALLOCATION - $40,000) 25 (DESIGN AND CONTINGENCIES - $100,000) 26 (10) SR 1057 OVER SATTERLEE CREEK, 27 LITCHFIELD TOWNSHIP, BRIDGE 28 REHABILITATION 380,000 29 (BASE PROJECT ALLOCATION - $350,000) 30 (DESIGN AND CONTINGENCIES - $30,000) 20080S1503B2376 - 58 -
1 (11) SR 1067 OVER SATTERLEE CREEK, 2 LITCHFIELD TOWNSHIP, BRIDGE 3 REPLACEMENT 150,000 4 (BASE PROJECT ALLOCATION - $120,000) 5 (DESIGN AND CONTINGENCIES - $30,000) 6 (12) SR 1017 OVER SOUTH CREEK, ORWELL 7 TOWNSHIP, BRIDGE REPLACEMENT 190,000 8 (BASE PROJECT ALLOCATION - $120,000) 9 (LAND ALLOCATION - $20,000) 10 (DESIGN AND CONTINGENCIES - $50,000) 11 (13) SR 1013 OVER BRANCH OF ROCKWELL 12 CREEK, PIKE TOWNSHIP, BRIDGE 13 REPLACEMENT 120,000 14 (BASE PROJECT ALLOCATION - $100,000) 15 (LAND ALLOCATION - $5,000) 16 (DESIGN AND CONTINGENCIES - $15,000) 17 (14) SR 1013 OVER MILL CREEK, PIKE 18 TOWNSHIP, BRIDGE REPLACEMENT 120,000 19 (BASE PROJECT ALLOCATION - $100,000) 20 (LAND ALLOCATION - $5,000) 21 (DESIGN AND CONTINGENCIES - $15,000) 22 (15) SR 1021 OVER RUMMERFIELD CREEK, 23 STANDING STONE TOWNSHIP, BRIDGE 24 REHABILITATION 170,000 25 (BASE PROJECT ALLOCATION - $150,000) 26 (DESIGN AND CONTINGENCIES - $20,000) 27 (16) SR 0706 OVER WOLF CREEK, STEVENS 28 TOWNSHIP, BRIDGE REPLACEMENT 660,000 29 (BASE PROJECT ALLOCATION - $510,000) 30 (LAND ALLOCATION - $30,000) 20080S1503B2376 - 59 -
1 (DESIGN AND CONTINGENCIES - $120,000) 2 (17) SR 1007 OVER WYALUSING CREEK, STEVENS 3 TOWNSHIP, BRIDGE REHABILITATION 250,000 4 (BASE PROJECT ALLOCATION - $200,000) 5 (LAND ALLOCATION - $10,000) 6 (DESIGN AND CONTINGENCIES - $40,000) 7 (18) SR 0014 OVER FALL BROOK, TROY 8 BOROUGH, BRIDGE REPLACEMENT 770,000 9 (BASE PROJECT ALLOCATION - $620,000) 10 (LAND ALLOCATION - $30,000) 11 (DESIGN AND CONTINGENCIES - $120,000) 12 (19) SR 1033 OVER LANING CREEK, WYSOX 13 TOWNSHIP, BRIDGE REHABILITATION 110,000 14 (BASE PROJECT ALLOCATION - $90,000) 15 (DESIGN AND CONTINGENCIES - $20,000) 16 SECTION 13. BUCKS COUNTY. 17 (A) LOCAL BRIDGES 18 (1) BRISTOL TOWNSHIP, HAINES ROAD OVER 19 AMTRAK, BRIDGE REPLACEMENT 20,650,000 20 (BASE PROJECT ALLOCATION - $18,000,000) 21 (LAND ALLOCATION - $400,000) 22 (DESIGN AND CONTINGENCIES - $2,250,000) 23 (2) BRISTOL TOWNSHIP, WISTAR ROAD OVER 24 QUEEN ANNE CREEK, BRIDGE 25 REHABILITATION 88,000 26 (BASE PROJECT ALLOCATION - $78,000) 27 (DESIGN AND CONTINGENCIES - $10,000) 28 (3) BRISTOL TOWNSHIP, GREEN LANE OVER 29 BLACK DITCH CREEK, BRIDGE 30 REHABILITATION 43,000 20080S1503B2376 - 60 -
1 (BASE PROJECT ALLOCATION - $38,000) 2 (DESIGN AND CONTINGENCIES - $5,000) 3 (4) BRISTOL TOWNSHIP, MILL CREEK ROAD OVER 4 BLACK DITCH CREEK, BRIDGE 5 REHABILITATION 5,502,000 6 (BASE PROJECT ALLOCATION - $4,890,000) 7 (DESIGN AND CONTINGENCIES - $612,000) 8 (5) MIDDLETOWN TOWNSHIP, FORSYNTHIA 9 CROSSING OVER MILL CREEK, BRIDGE 10 REHABILITATION 83,000 11 (BASE PROJECT ALLOCATION - $74,000) 12 (DESIGN AND CONTINGENCIES - $9,000) 13 (6) WARWICK TOWNSHIP, SCHOOL ROAD OVER 14 TRIBUTARY OF NEHSAMINY CREEK, BRIDGE 15 REHABILITATION 31,000 16 (BASE PROJECT ALLOCATION - $27,000) 17 (DESIGN AND CONTINGENCIES - $4,000) 18 (7) WARWICK TOWNSHIP, SYCAMORE DRIVE OVER 19 TRIBUTARY OF LITTLE NESHAMINY CREEK, 20 BRIDGE REHABILITATION 10,000 21 (BASE PROJECT ALLOCATION - $9,000) 22 (DESIGN AND CONTINGENCIES - $1,000) 23 (8) WARWICK TOWNSHIP, DARK HOLLOW ROAD 24 OVER TRIBUTARY OF NESHAMINY CREEK, 25 BRIDGE REHABILITATION 17,000 26 (BASE PROJECT ALLOCATION - $15,000) 27 (DESIGN AND CONTINGENCIES - $2,000) 28 (9) IVYLAND BOROUGH, GREELEY AVENUE OVER 29 TRIBUTARY OF NESHAMINY CREEK, BRIDGE 30 REHABILITATION 104,000 20080S1503B2376 - 61 -
1 (BASE PROJECT ALLOCATION - $76,000) 2 (DESIGN AND CONTINGENCIES - $28,000) 3 (10) BENSALEM TOWNSHIP, T-328 OVER 4 NESHAMINY CREEK, BRIDGE REHABILITATION 198,000 5 (BASE PROJECT ALLOCATION - $168,000) 6 (DESIGN AND CONTINGENCIES - $30,000) 7 (11) BENSALEM TOWNSHIP, RED LION ROAD OVER 8 POQUESSING CREEK, BRIDGE 9 REHABILITATION 61,000 10 (BASE PROJECT ALLOCATION - $51,000) 11 (DESIGN AND CONTINGENCIES - $10,000) 12 (12) WARWICK TOWNSHIP, FAIRWAY DRIVE OVER 13 TRIBUTARY OF FISH CREEK, BRIDGE 14 REHABILITATION 14,000 15 (BASE PROJECT ALLOCATION - $13,000) 16 (DESIGN AND CONTINGENCIES - $1,000) 17 (13) NOCKAMIXON TOWNSHIP, T-441 OVER 18 BEAVER CREEK, BRIDGE REHABILITATION 52,000 19 (BASE PROJECT ALLOCATION - $44,000) 20 (DESIGN AND CONTINGENCIES - $8,000) 21 (14) SPRINGFIELD TOWNSHIP, T-479 OVER 22 COOKS CREEK, BRIDGE REHABILITATION 57,000 23 (BASE PROJECT ALLOCATION - $48,000) 24 (DESIGN AND CONTINGENCIES - $9,000) 25 (15) NOCKAMIXON TOWNSHIP, T-481 OVER 26 GALLOWS RUN, BRIDGE REHABILITATION 44,000 27 (BASE PROJECT ALLOCATION - $37,000) 28 (DESIGN AND CONTINGENCIES - $7,000) 29 (16) NOCKAMIXON TOWNSHIP, T-487 OVER 30 GALLOWS RUN, BRIDGE REHABILITATION 98,000 20080S1503B2376 - 62 -
1 (BASE PROJECT ALLOCATION - $83,000) 2 (DESIGN AND CONTINGENCIES - $15,000) 3 (17) MILFORD TOWNSHIP, T-334 OVER UNAMI 4 CREEK, BRIDGE REPLACEMENT 2,600,000 5 (BASE PROJECT ALLOCATION - $2,300,000) 6 (DESIGN AND CONTINGENCIES - $300,000) 7 (18) PERKASIE BOROUGH, WALNUT STREET OVER 8 EAST BRANCH PERKIOMEN CREEK, BRIDGE 9 REPLACEMENT 3,600,000 10 (BASE PROJECT ALLOCATION - $3,000,000) 11 (DESIGN AND CONTINGENCIES - $600,000) 12 (19) HILLTOWN TOWNSHIP, T-417 OVER MORRIS 13 RUN, BRIDGE REPLACEMENT 1,200,000 14 (BASE PROJECT ALLOCATION - $1,000,000) 15 (DESIGN AND CONTINGENCIES - $200,000) 16 (20) NEW HOPE BOROUGH, STOCKTON AVENUE 17 OVER AQUETONG CREEK, BRIDGE 18 REHABILITATION 112,000 19 (BASE PROJECT ALLOCATION - $95,000) 20 (DESIGN AND CONTINGENCIES - $17,000) 21 (21) HILLTOWN TOWNSHIP, T-362 OVER MORRIS 22 RUN, BRIDGE REHABILITATION 63,000 23 (BASE PROJECT ALLOCATION - $53,000) 24 (DESIGN AND CONTINGENCIES - $10,000) 25 (22) BEDMINSTER TOWNSHIP, T-417 OVER DEEP 26 RUN, BRIDGE REPLACEMENT 1,200,000 27 (BASE PROJECT ALLOCATION - $1,000,000) 28 (DESIGN AND CONTINGENCIES - $200,000) 29 (23) BEDMINSTER TOWNSHIP, T-416 OVER DEEP 30 RUN, BRIDGE REHABILITATION 378,000 20080S1503B2376 - 63 -
1 (BASE PROJECT ALLOCATION - $371,000) 2 (DESIGN AND CONTINGENCIES - $7,000) 3 (24) BUCKINGHAM TOWNSHIP, T-376 OVER 4 WATSON CREEK, BRIDGE REHABILITATION 27,000 5 (BASE PROJECT ALLOCATION - $22,000) 6 (DESIGN AND CONTINGENCIES - $5,000) 7 (25) TINICUM TOWNSHIP, T-440 OVER TINICUM 8 CREEK, BRIDGE REHABILITATION 37,000 9 (BASE PROJECT ALLOCATION - $31,000) 10 (DESIGN AND CONTINGENCIES - $6,000) 11 (26) TINICUM TOWNSHIP, T-439 OVER RAPP 12 CREEK, BRIDGE REHABILITATION 93,000 13 (BASE PROJECT ALLOCATION - $84,000) 14 (DESIGN AND CONTINGENCIES - $9,000) 15 (27) BUCKINGHAM AND WARWICK TOWNSHIPS, T- 16 381 OVER NESHAMINY CREEK, BRIDGE 17 REHABILITATION 393,000 18 (BASE PROJECT ALLOCATION - $333,000) 19 (DESIGN AND CONTINGENCIES - $60,000) 20 (28) PLUMSTEAD TOWNSHIP, T-390 OVER NORTH 21 BRANCH NESHAMINY CREEK, BRIDGE 22 REHABILITATION 253,000 23 (BASE PROJECT ALLOCATION - $215,000) 24 (DESIGN AND CONTINGENCIES - $38,000) 25 (29) BEDMINSTER TOWNSHIP, T-427 OVER 26 TOHICKON CREEK, BRIDGE REPLACEMENT 3,050,000 27 (BASE PROJECT ALLOCATION - $2,800,000) 28 (DESIGN AND CONTINGENCIES - $250,000) 29 (30) TINICUM TOWNSHIP, T-443 OVER 30 PENNSYLVANIA CANAL, BRIDGE 20080S1503B2376 - 64 -
1 REHABILITATION 150,000 2 (BASE PROJECT ALLOCATION - $125,000) 3 (DESIGN AND CONTINGENCIES - $25,000) 4 (31) TINICUM TOWNSHIP, T-445 OVER 5 PENNSYLVANIA CANAL, BRIDGE REPLACEMENT 2,640,000 6 (BASE PROJECT ALLOCATION - $2,200,000) 7 (DESIGN AND CONTINGENCIES - $440,000) 8 (32) WEST ROCKHILL TOWNSHIP, T-433 OVER 9 MILL CREEK, BRIDGE REHABILITATION 117,000 10 (BASE PROJECT ALLOCATION - $99,000) 11 (DESIGN AND CONTINGENCIES - $18,000) 12 (33) HILLTOWN TOWNSHIP, T-421 OVER MORRIS 13 RUN, BRIDGE REPLACEMENT 2,400,000 14 (BASE PROJECT ALLOCATION - $2,150,000) 15 (DESIGN AND CONTINGENCIES - $250,000) 16 (34) PLUMSTEAD TOWNSHIP, T-146 OVER CABIN 17 RUN, BRIDGE REHABILITATION 38,000 18 (BASE PROJECT ALLOCATION - $32,000) 19 (DESIGN AND CONTINGENCIES - $6,000) 20 (35) BEDMINSTER TOWNSHIP, T-376 OVER 21 PERKIOMEN CREEK, BRIDGE REHABILITATION 32,000 22 (BASE PROJECT ALLOCATION - $27,000) 23 (DESIGN AND CONTINGENCIES - $5,000) 24 (36) BRISTOL TOWNSHIP, RANDALL AVENUE OVER 25 AMTRAK, BRIDGE REPLACEMENT 2,809,000 26 (BASE PROJECT ALLOCATION - $2,174,000) 27 (LAND ALLOCATION - $363,000) 28 (DESIGN AND CONTINGENCIES - $272,000) 29 (37) TINICUM TOWNSHIP, T-439 OVER BEAVER 30 CREEK, BRIDGE REPLACEMENT 1,900,000 20080S1503B2376 - 65 -
1 (BASE PROJECT ALLOCATION - $1,700,000) 2 (DESIGN AND CONTINGENCIES - $200,000) 3 (38) NOCKAMIXON TOWNSHIP, T-443 OVER 4 BEAVER CREEK, BRIDGE REHABILITATION 82,000 5 (BASE PROJECT ALLOCATION - $69,000) 6 (DESIGN AND CONTINGENCIES - $13,000) 7 (B) STATE BRIDGES 8 (1) SR 2113, PEBBLE HILL OVER PEBBLE 9 CREEK, BUCKINGHAM TOWNSHIP, BRIDGE 10 REHABILITATION 63,000 11 (BASE PROJECT ALLOCATION - $11,000) 12 (LAND ALLOCATION - $1,000) 13 (DESIGN AND CONTINGENCIES - $51,000) 14 (2) SR 2103, PINEVILLE ROAD OVER PIDCOCK 15 CREEK, BUCKINGHAM TOWNSHIP, BRIDGE 16 REHABILITATION 63,000 17 (BASE PROJECT ALLOCATION - $11,000) 18 (LAND ALLOCATION - $1,000) 19 (DESIGN AND CONTINGENCIES - $51,000) 20 (3) SR 2113, PEBBLE HILL ROAD OVER BRANCH 21 OF NESHAMINY CREEK, DOYLESTOWN BOROUGH, 22 BRIDGE REHABILITATION 63,000 23 (BASE PROJECT ALLOCATION - $11,000) 24 (LAND ALLOCATION - $1,000) 25 (DESIGN AND CONTINGENCIES - $51,000) 26 (4) SR 2020, TYBURN ROAD OVER RAMP G, 27 FALLS TOWNSHIP, BRIDGE REHABILITATION 5,384,000 28 (BASE PROJECT ALLOCATION - $5,000,000) 29 (DESIGN AND CONTINGENCIES - $384,000) 30 (5) SR 2020, TYBURN ROAD OVER WARNER 20080S1503B2376 - 66 -
1 COMPANY ROAD, FALLS TOWNSHIP, BRIDGE 2 REHABILITATION 5,384,000 3 (BASE PROJECT ALLOCATION - $5,000,000) 4 (DESIGN AND CONTINGENCIES - $384,000) 5 (6) SR 2020, TYBURN ROAD OVER CONRAIL 6 RAILROAD TO U.S. STEEL, FALLS TOWNSHIP, 7 BRIDGE REHABILITATION 5,384,000 8 (BASE PROJECT ALLOCATION - $5,000,000) 9 (DESIGN AND CONTINGENCIES - $384,000) 10 (7) SR 2020, TYBURN ROAD OVER NEWBOLD 11 ROAD, FALLS TOWNSHIP, BRIDGE 12 REHABILITATION 5,384,000 13 (BASE PROJECT ALLOCATION - $5,000,000) 14 (DESIGN AND CONTINGENCIES - $384,000) 15 (8) SR 2020, TYBURN ROAD OVER AMTRAK, 16 FALLS TOWNSHIP, BRIDGE REHABILITATION 5,384,000 17 (BASE PROJECT ALLOCATION - $5,000,000) 18 (DESIGN AND CONTINGENCIES - $384,000) 19 (9) SR 2020, TYBURN ROAD OVER PENNSYLVANIA 20 AVENUE, FALLS TOWNSHIP, BRIDGE 21 REHABILITATION 5,384,000 22 (BASE PROJECT ALLOCATION - $5,000,000) 23 (DESIGN AND CONTINGENCIES - $384,000) 24 (10) SR 2075, DOLINGTON ROAD OVER I-95, 25 LOWER MAKEFIELD TOWNSHIP, BRIDGE 26 REHABILITATION 63,000 27 (BASE PROJECT ALLOCATION - $11,000) 28 (LAND ALLOCATION - $1,000) 29 (DESIGN AND CONTINGENCIES - $51,000) 30 (11) SR 2196, QUARRY ROAD OVER I-95, LOWER 20080S1503B2376 - 67 -
1 MAKEFIELD TOWNSHIP, BRIDGE 2 REHABILITATION 63,000 3 (BASE PROJECT ALLOCATION - $11,000) 4 (LAND ALLOCATION - $1,000) 5 (DESIGN AND CONTINGENCIES - $51,000) 6 (12) SR 2195, BIG OAK ROAD OVER I-95, 7 MIDDLETOWN TOWNSHIP, BRIDGE 8 REHABILITATION 63,000 9 (BASE PROJECT ALLOCATION - $11,000) 10 (LAND ALLOCATION - $1,000) 11 (DESIGN AND CONTINGENCIES - $51,000) 12 (13) SR 2037, LINCOLN HIGHWAY OVER BRANCH 13 OF QUEEN ANNE CREEK, MIDDLETOWN 14 TOWNSHIP, BRIDGE REHABILITATION 1,389,000 15 (BASE PROJECT ALLOCATION - $96,000) 16 (LAND ALLOCATION - $31,000) 17 (DESIGN AND CONTINGENCIES - $1,262,000) 18 (14) SR 4055, KUMRY ROAD OVER UNAMI CREEK, 19 MILFORD TOWNSHIP, BRIDGE 20 REHABILITATION 1,389,000 21 (BASE PROJECT ALLOCATION - $96,000) 22 (LAND ALLOCATION - $31,000) 23 (DESIGN AND CONTINGENCIES - $1,262,000) 24 (15) STEINSBURG ROAD OVER BRANCH OF 25 MOLASSES CREEK, MILFORD TOWNSHIP, 26 BRIDGE REPLACEMENT 1,500,000 27 (BASE PROJECT ALLOCATION - $750,000) 28 (LAND ALLOCATION - $150,000) 29 (DESIGN AND CONTINGENCIES - $600,000) 30 (16) SR 0202, BUTLER AVENUE OVER NORTH 20080S1503B2376 - 68 -
1 BRANCH OF NESHAMINY CREEK, NEW BRITAIN 2 BOROUGH, BRIDGE REPLACEMENT 3,500,000 3 (BASE PROJECT ALLOCATION - $921,000) 4 (LAND ALLOCATION - $65,000) 5 (DESIGN AND CONTINGENCIES - $2,514,000) 6 (17) SR 2103, STONEY HILL ROAD OVER 7 AQUETONG CREEK, NEW HOPE BOROUGH, 8 BRIDGE REHABILITATION 63,000 9 (BASE PROJECT ALLOCATION - $11,000) 10 (LAND ALLOCATION - $1,000) 11 (DESIGN AND CONTINGENCIES - $51,000) 12 (18) SR 1003, CARVERS-WISMER ROAD OVER 13 GADDES RUN, PLUMSTEAD TOWNSHIP, BRIDGE 14 REHABILITATION 1,389,000 15 (BASE PROJECT ALLOCATION - $96,000 16 (LAND ALLOCATION - $31,000) 17 (DESIGN AND CONTINGENCIES - $1,262,000) 18 (19) SR 0032, RIVER ROAD OVER HICKORY RUN, 19 PLUMSTEAD TOWNSHIP, BRIDGE 20 REHABILITATION 1,389,000 21 (BASE PROJECT ALLOCATION - $96,000) 22 (LAND ALLOCATION - $31,000) 23 (DESIGN AND CONTINGENCIES - $1,262,000) 24 (20) SR 0032, RIVER ROAD OVER TOHICKON 25 CREEK, PLUMSTEAD TOWNSHIP, BRIDGE 26 REPLACEMENT 5,112,000 27 (BASE PROJECT ALLOCATION - $4,222,000) 28 (LAND ALLOCATION - $450,000) 29 (DESIGN AND CONTINGENCIES - $440,000) 30 (21) SR 1011, STUMP ROAD OVER IRISH RUN, 20080S1503B2376 - 69 -
1 PLUMSTEAD TOWNSHIP, BRIDGE 2 REHABILITATION 63,000 3 (BASE PROJECT ALLOCATION - $11,000) 4 (LAND ALLOCATION - $1,000) 5 (DESIGN AND CONTINGENCIES - $51,000) 6 (22) SR 4013, MAIN STREET OVER NORFOLK 7 SOUTHERN RAILWAY, SELLERSVILLE BOROUGH, 8 BRIDGE REPLACEMENT 3,500,000 9 (BASE PROJECT ALLOCATION - $1,093,000) 10 (LAND ALLOCATION - $250,000) 11 (DESIGN AND CONTINGENCIES - $2,157,000) 12 (23) SR 1003, AQUETONG ROAD OVER BRANCH OF 13 AQUETONG CREEK, SOLEBURY TOWNSHIP, 14 BRIDGE REHABILITATION 1,389,000 15 (BASE PROJECT ALLOCATION - $96,000) 16 (LAND ALLOCATION - $31,000) 17 (DESIGN AND CONTINGENCIES - $1,262,000) 18 (24) SR 0032, RIVER ROAD OVER CUTTALOSSA 19 CREEK, SOLEBURY TOWNSHIP, BRIDGE 20 REPLACEMENT 2,000,000 21 (BASE PROJECT ALLOCATION - $546,000) 22 (LAND ALLOCATION - $35,000) 23 (DESIGN AND CONTINGENCIES - $1,419,000) 24 (25) SR 0032, RIVER ROAD OVER TRIBUTARY OF 25 DELAWARE RIVER, SOLEBURY TOWNSHIP, 26 BRIDGE REHABILITATION 63,000 27 (BASE PROJECT ALLOCATION - $11,000) 28 (LAND ALLOCATION - $1,000) 29 (DESIGN AND CONTINGENCIES - $51,000) 30 (26) SR 0032, RIVER ROAD OVER PENNSYLVANIA 20080S1503B2376 - 70 -
1 CANAL, SOLEBURY TOWNSHIP, BRIDGE 2 REHABILITATION 3,073,000 3 (BASE PROJECT ALLOCATION - $2,853,000) 4 (LAND ALLOCATION - $150,000) 5 (DESIGN AND CONTINGENCIES - $70,000) 6 (27) SR 1004 OVER PAUNNACUSSING CREEK, 7 SOLEBURY TOWNSHIP, BRIDGE 8 REHABILITATION 1,389,000 9 (BASE PROJECT ALLOCATION - $96,000) 10 (LAND ALLOCATION - $31,000) 11 (DESIGN AND CONTINGENCIES - $1,262,000) 12 (28) SR 4101, OLD BETHLEHEM ROAD OVER 13 COOKS CREEK, SPRINGFIELD TOWNSHIP, 14 BRIDGE REPLACEMENT 375,000 15 (BASE PROJECT ALLOCATION - $250,000) 16 (LAND ALLOCATION - $10,000) 17 (DESIGN AND CONTINGENCIES - $115,000) 18 (29) SR 1012, HEADQUARTERS ROAD OVER 19 TINICUM CREEK, TINICUM TOWNSHIP, BRIDGE 20 REHABILITATION 1,389,000 21 (BASE PROJECT ALLOCATION - $96,000) 22 (LAND ALLOCATION - $31,000) 23 (DESIGN AND CONTINGENCIES - $1,262,000) 24 (30) SR 0032, RIVER ROAD OVER DELAWARE 25 CANAL, TINICUM TOWNSHIP, BRIDGE 26 REPLACEMENT 1,476,000 27 (BASE PROJECT ALLOCATION - $691,000) 28 (LAND ALLOCATION - $35,000) 29 (DESIGN AND CONTINGENCIES - $750,000) 30 (31) SR 2101, LURGAN ROAD OVER BRANCH OF 20080S1503B2376 - 71 -
1 PIDCOCK CREEK, UPPER MAKEFIELD 2 TOWNSHIP, BRIDGE REHABILITATION 63,000 3 (BASE PROJECT ALLOCATION - $11,000) 4 (LAND ALLOCATION - $1,000) 5 (DESIGN AND CONTINGENCIES - $51,000) 6 (32) STREET ROAD OVER BRANCH OF NESHAMINY 7 CREEK, WARRINGTON TOWNSHIP, BRIDGE 8 REPLACEMENT 940,000 9 (BASE PROJECT ALLOCATION - $500,000) 10 (LAND ALLOCATION - $30,000) 11 (DESIGN AND CONTINGENCIES - $410,000) 12 (33) SR 2025, BRISTOL ROAD OVER BRANCH OF 13 LITTLE NESHAMINY CREEK, WARWICK 14 TOWNSHIP, BRIDGE REPLACEMENT 2,000,000 15 (BASE PROJECT ALLOCATION - $460,000) 16 (LAND ALLOCATION - $30,000) 17 (DESIGN AND CONTINGENCIES - $1,510,000) 18 (34) ALLENTOWN ROAD OVER RIDGE VALLEY 19 CREEK, WEST ROCKHILL TOWNSHIP, BRIDGE 20 REHABILITATION 2,000,000 21 (BASE PROJECT ALLOCATION - $691,000) 22 (LAND ALLOCATION - $60,000) 23 (DESIGN AND CONTINGENCIES - $1,249,000) 24 (35) SR 2091, MILL CREEK ROAD OVER LAHASKA 25 CREEK, WRIGHTSTOWN TOWNSHIP, BRIDGE 26 REHABILITATION 63,000 27 (BASE PROJECT ALLOCATION - $11,000) 28 (LAND ALLOCATION - $1,000) 29 (DESIGN AND CONTINGENCIES - $51,000) 30 (36) SR 2091, MILL CREEK ROAD, BRIDGE 20080S1503B2376 - 72 -
1 NO.7340 OVER BRANCH OF MILL CREEK, 2 WRIGHTSTOWN TOWNSHIP, BRIDGE 3 REHABILITATION 63,000 4 (BASE PROJECT ALLOCATION - $11,000) 5 (LAND ALLOCATION - $1,000) 6 (DESIGN AND CONTINGENCIES - $51,000) 7 (37) SR 2091, MILL CREEK ROAD, BRIDGE 8 NO.7342 OVER BRANCH OF MILL CREEK, 9 WRIGHTSTOWN TOWNSHIP, BRIDGE 10 REHABILITATION 1,389,000 11 (BASE PROJECT ALLOCATION - $96,000) 12 (LAND ALLOCATION - $31,000) 13 (DESIGN AND CONTINGENCIES - $1,262,000) 14 (38) SR 0032, RIVER ROAD OVER BUCK CREEK, 15 YARDLEY BOROUGH, BRIDGE REHABILITATION 63,000 16 (BASE PROJECT ALLOCATION - $11,000) 17 (LAND ALLOCATION - $1,000) 18 (DESIGN AND CONTINGENCIES - $51,000) 19 (39) SR 2071, TAYLORSVILLE ROAD OVER DYERS 20 CREEK, YARDLEY BOROUGH, BRIDGE 21 REHABILITATION 63,000 22 (BASE PROJECT ALLOCATION - $11,000) 23 (LAND ALLOCATION - $1,000) 24 (DESIGN AND CONTINGENCIES - $51,000) 25 (40) SR 2071, YARDLEY ROAD OVER VAN HORN 26 CREEK, YARDLEY BOROUGH, BRIDGE 27 REHABILITATION 1,389,000 28 (BASE PROJECT ALLOCATION - $96,000) 29 (LAND ALLOCATION - $31,000) 30 (DESIGN AND CONTINGENCIES - $1,262,000) 20080S1503B2376 - 73 -
1 (41) SR 4047 OVER TRIBUTARY OF DRY BRANCH 2 CREEK, RICHLAND TOWNSHIP, BRIDGE 3 REPLACEMENT 1,000,000 4 (BASE PROJECT ALLOCATION - $1,000,000) 5 SECTION 14. BUTLER COUNTY. 6 (A) LOCAL BRIDGES 7 (1) CRANBERRY TOWNSHIP, POWELL ROAD (T- 8 301) OVER BRUSH CREEK, BRIDGE 9 REPLACEMENT 1,200,000 10 (BASE PROJECT ALLOCATION - $1,200,000) 11 (B) STATE BRIDGES 12 (1) SR 0528 OVER BIG RUN, BRADY TOWNSHIP, 13 BRIDGE REPLACEMENT 233,000 14 (BASE PROJECT ALLOCATION - $53,000) 15 (LAND ALLOCATION - $40,000) 16 (DESIGN AND CONTINGENCIES - $140,000) 17 (2) SR 3004 OVER CONNOQUENESSING CREEK, 18 BUTLER TOWNSHIP, BRIDGE REPLACEMENT 401,000 19 (BASE PROJECT ALLOCATION - $221,000) 20 (LAND ALLOCATION - $40,000) 21 (DESIGN AND CONTINGENCIES - $140,000) 22 (3) SR 3015 OVER TRIBUTARY OF BREAKNECK 23 CREEK, CALLERY BOROUGH, BRIDGE 24 REPLACEMENT 230,000 25 (BASE PROJECT ALLOCATION - $50,000) 26 (LAND ALLOCATION - $40,000) 27 (DESIGN AND CONTINGENCIES - $140,000) 28 (4) SR 1027 OVER TRIBUTARY OF SOUTH FORK 29 OF LITTLE SCRUBGRASS, CHERRY VALLEY 30 BOROUGH, BRIDGE REPLACEMENT 235,000 20080S1503B2376 - 74 -
1 (BASE PROJECT ALLOCATION - $150,000) 2 (LAND ALLOCATION - $15,000) 3 (DESIGN AND CONTINGENCIES - $70,000) 4 (5) SR 0008 OVER BRANCH OF MUDDY CREEK, 5 CLAY TOWNSHIP, BRIDGE REPLACEMENT 271,000 6 (BASE PROJECT ALLOCATION - $91,000) 7 (LAND ALLOCATION - $40,000) 8 (DESIGN AND CONTINGENCIES - $140,000) 9 (6) SR 1010 OVER TRIBUTARY OF GLADE RUN, 10 CLAY TOWNSHIP, BRIDGE REPLACEMENT 216,000 11 (BASE PROJECT ALLOCATION - $36,000) 12 (LAND ALLOCATION - $40,000) 13 (DESIGN AND CONTINGENCIES - $140,000) 14 (7) SR 2011, BRIDGE NO.8034 OVER 15 LARDINTOWN RUN, CLINTON TOWNSHIP, 16 BRIDGE REHABILITATION 195,000 17 (BASE PROJECT ALLOCATION - $150,000) 18 (LAND ALLOCATION - $15,000) 19 (DESIGN AND CONTINGENCIES - $30,000) 20 (8) SR 2011, BRIDGE NO.8038 OVER 21 LARDINTOWN RUN, CLINTON TOWNSHIP, 22 BRIDGE REPLACEMENT 220,000 23 (BASE PROJECT ALLOCATION - $150,000) 24 (DESIGN AND CONTINGENCIES - $70,000) 25 (9) SR 0038, BRIDGE NO.7816 OVER TRIBUTARY 26 OF CONNOQUENESSING CREEK, CONCORD 27 TOWNSHIP, BRIDGE REPLACEMENT 1,080,000 28 (BASE PROJECT ALLOCATION - $750,000) 29 (LAND ALLOCATION - $30,000) 30 (DESIGN AND CONTINGENCIES - $300,000) 20080S1503B2376 - 75 -
1 (10) SR 0038, BRIDGE NO.7817 OVER 2 TRIBUTARY OF CONNOQUENESSING CREEK, 3 CONCORD TOWNSHIP, BRIDGE REPLACEMENT 211,000 4 (BASE PROJECT ALLOCATION - $31,000) 5 (LAND ALLOCATION - $40,000) 6 (DESIGN AND CONTINGENCIES - $140,000) 7 (11) SR 0528 OVER LITTLE CONNOQUENESSING 8 CREEK, CONNOQUENESSING TOWNSHIP, BRIDGE 9 REPLACEMENT 434,000 10 (BASE PROJECT ALLOCATION - $254,000) 11 (LAND ALLOCATION - $40,000) 12 (DESIGN AND CONTINGENCIES - $140,000) 13 (12) SR 0528 OVER CONNOQUENESSING CREEK, 14 FORWARD TOWNSHIP, BRIDGE REPLACEMENT 1,152,000 15 (BASE PROJECT ALLOCATION - $972,000) 16 (LAND ALLOCATION - $40,000) 17 (DESIGN AND CONTINGENCIES - $140,000) 18 (13) SR 0008 OVER BRANCH OF CURRY RUN, 19 HARRISVILLE BOROUGH, BRIDGE 20 REPLACEMENT 284,000 21 (BASE PROJECT ALLOCATION - $104,000) 22 (LAND ALLOCATION - $40,000) 23 (DESIGN AND CONTINGENCIES - $140,000) 24 (14) SR 0079 SOUTHBOUND OVER SR 8005, RAMP 25 E, JACKSON TOWNSHIP, BRIDGE 26 RESTORATION 101,000 27 (BASE PROJECT ALLOCATION - $101,000) 28 (15) SR 0008 OVER GLADE RUN, MIDDLESEX 29 TOWNSHIP, BRIDGE REPLACEMENT 417,000 30 (BASE PROJECT ALLOCATION - $237,000) 20080S1503B2376 - 76 -
1 (LAND ALLOCATION - $40,000) 2 (DESIGN AND CONTINGENCIES - $140,000) 3 (16) SR 3012 OVER TRIBUTARY OF GLADE RUN, 4 MIDDLESEX TOWNSHIP, BRIDGE REPLACEMENT 267,000 5 (BASE PROJECT ALLOCATION - $87,000) 6 (LAND ALLOCATION - $40,000) 7 (DESIGN AND CONTINGENCIES - $140,000) 8 (17) SR 0079, NORTHBOUND OVER T-338, 9 PFEIFER ROAD, MUDDYCREEK TOWNSHIP, 10 BRIDGE RESTORATION 101,000 11 (BASE PROJECT ALLOCATION - $101,000) 12 (18) SR 0079, SOUTHBOUND OVER T-338, 13 PFEIFER ROAD, MUDDYCREEK TOWNSHIP, 14 BRIDGE RESTORATION 101,000 15 (BASE PROJECT ALLOCATION - $101,000) 16 (19) SR 3044 OVER SR 0079, MUDDYCREEK 17 TOWNSHIP, BRIDGE REPLACEMENT 1,427,000 18 (BASE PROJECT ALLOCATION - $1,247,000) 19 (LAND ALLOCATION - $40,000) 20 (DESIGN AND CONTINGENCIES - $140,000) 21 (20) SR 1004 OVER TRIBUTARY OF SILVER 22 CREEK, PARKER TOWNSHIP, BRIDGE 23 REPLACEMENT 209,000 24 (BASE PROJECT ALLOCATION - $29,000) 25 (LAND ALLOCATION - $40,000) 26 (DESIGN AND CONTINGENCIES - $140,000) 27 (21) SR 0268 OVER TRIBUTARY OF SOUTH 28 BRANCH OF BEAR CREEK, PETROLIA BOROUGH, 29 BRIDGE REPLACEMENT 210,000 30 (BASE PROJECT ALLOCATION - $30,000) 20080S1503B2376 - 77 -
1 (LAND ALLOCATION - $40,000) 2 (DESIGN AND CONTINGENCIES - $140,000) 3 (22) SR 0173 OVER TRIBUTARY OF WOLF CREEK, 4 SLIPPERY ROCK TOWNSHIP, BRIDGE 5 REPLACEMENT 294,000 6 (BASE PROJECT ALLOCATION - $114,000) 7 (LAND ALLOCATION - $40,000) 8 (DESIGN AND CONTINGENCIES - $140,000) 9 (23) SR 4010 OVER TRIBUTARY OF SLIPPERY 10 ROCK CREEK, WASHINGTON TOWNSHIP, BRIDGE 11 REPLACEMENT 235,000 12 (BASE PROJECT ALLOCATION - $150,000) 13 (LAND ALLOCATION - $15,000) 14 (DESIGN AND CONTINGENCIES - $70,000) 15 (24) SR 4008 OVER SLIPPERY ROCK CREEK, 16 WEST LIBERTY BOROUGH, BRIDGE 17 REPLACEMENT 674,000 18 (BASE PROJECT ALLOCATION - $494,000) 19 (LAND ALLOCATION - $40,000) 20 (DESIGN AND CONTINGENCIES - $140,000) 21 (25) SR 1019 OVER NORTH BRANCH OF ROUGH 22 RUN, WINFIELD TOWNSHIP, BRIDGE 23 REPLACEMENT 281,000 24 (BASE PROJECT ALLOCATION - $101,000) 25 (LAND ALLOCATION - $40,000) 26 (DESIGN AND CONTINGENCIES - $140,000) 27 SECTION 15. CAMBRIA COUNTY. 28 (A) LOCAL BRIDGES (RESERVED) 29 (B) STATE BRIDGES 30 (1) SR 0403 OVER STONYCREEK RIVER, CITY OF 20080S1503B2376 - 78 -
1 JOHNSTOWN, BRIDGE REHABILITATION 5,537,000 2 (BASE PROJECT ALLOCATION - $5,537,000) 3 (2) SR 0053 OVER BENS CREEK, PORTAGE 4 TOWNSHIP, BRIDGE REHABILITATION 40,000 5 (BASE PROJECT ALLOCATION - $27,000) 6 (LAND ALLOCATION - $1,000) 7 (DESIGN AND CONTINGENCIES - $12,000) 8 (3) SR 2012 OVER BENS CREEK, PORTAGE 9 TOWNSHIP, BRIDGE REHABILITATION 140,000 10 (BASE PROJECT ALLOCATION - $140,000) 11 (4) SR 3104 OVER US 219, RICHLAND 12 TOWNSHIP, BRIDGE REHABILITATION 1,475,000 13 (BASE PROJECT ALLOCATION - $1,300,000) 14 (DESIGN AND CONTINGENCIES - $175,000) 15 (5) SR 0053 OVER LAUREL RUN, SUMMERHILL 16 BOROUGH, BRIDGE REHABILITATION 80,000 17 (BASE PROJECT ALLOCATION - $55,000) 18 (LAND ALLOCATION - $1,000) 19 (DESIGN AND CONTINGENCIES - $24,000) 20 (6) SR 0053 OVER ABANDONED MINE TRACE, 21 WASHINGTON TOWNSHIP, BRIDGE 22 REPLACEMENT 100,000 23 (BASE PROJECT ALLOCATION - $70,000) 24 (LAND ALLOCATION - $5,000) 25 (DESIGN AND CONTINGENCIES - $25,000) 26 SECTION 16. CAMERON COUNTY. 27 (A) LOCAL BRIDGES (RESERVED) 28 (B) STATE BRIDGES 29 (1) SR 4003 OVER TRIBUTARY OF CLEAR CREEK, 30 SHIPPEN TOWNSHIP, BRIDGE REPLACEMENT 215,000 20080S1503B2376 - 79 -
1 (BASE PROJECT ALLOCATION - $140,000) 2 (DESIGN AND CONTINGENCIES - $75,000) 3 SECTION 17. CARBON COUNTY. 4 (A) LOCAL BRIDGES 5 (1) MAHONING TOWNSHIP, FREDERICKS GROVE 6 OVER MAHONING CREEK, BRIDGE 7 REPLACEMENT 1,320,000 8 (BASE PROJECT ALLOCATION - $800,000) 9 (LAND ALLOCATION - $20,000) 10 (DESIGN AND CONTINGENCIES - $500,000) 11 (2) LEHIGHTON BOROUGH, EAST PENN STREET 12 OVER MAHONING CREEK, BRIDGE 13 REHABILITATION 300,000 14 (BASE PROJECT ALLOCATION - $200,000) 15 (DESIGN AND CONTINGENCIES - $100,000) 16 (3) PACKER TOWNSHIP, GRIST MILL ROAD OVER 17 QUAKAKE CREEK, BRIDGE REHABILITATION 300,000 18 (BASE PROJECT ALLOCATION - $200,000) 19 (DESIGN AND CONTINGENCIES - $100,000) 20 (4) EAST PENN TOWNSHIP, RIVERVIEW ROAD 21 OVER LIZARD CREEK, BRIDGE 22 REHABILITATION 300,000 23 (BASE PROJECT ALLOCATION - $200,000) 24 (DESIGN AND CONTINGENCIES - $100,000) 25 (5) EAST PENN TOWNSHIP, BLUE MOUNTAIN ROAD 26 OVER LIZARD CREEK, BRIDGE 27 REHABILITATION 300,000 28 (BASE PROJECT ALLOCATION - $200,000) 29 (DESIGN AND CONTINGENCIES - $100,000) 30 (6) EAST PENN TOWNSHIP, GERMANS ROAD OVER 20080S1503B2376 - 80 -
1 LIZARD CREEK, BRIDGE REHABILITATION 300,000 2 (BASE PROJECT ALLOCATION - $200,000) 3 (DESIGN AND CONTINGENCIES - $100,000) 4 (7) EAST PENN TOWNSHIP, LAUCHNOR ROAD OVER 5 LIZARD CREEK, BRIDGE REHABILITATION 300,000 6 (BASE PROJECT ALLOCATION - $200,000) 7 (DESIGN AND CONTINGENCIES - $100,000) 8 (8) EAST PENN TOWNSHIP, STONE MOUNTAIN 9 ROAD OVER LIZARD CREEK, BRIDGE 10 REHABILITATION 300,000 11 (BASE PROJECT ALLOCATION - $200,000) 12 (DESIGN AND CONTINGENCIES - $100,000) 13 (9) LEHIGH TOWNSHIP, T-477 OVER LESLIE 14 RUN, BRIDGE REPLACEMENT 520,000 15 (BASE PROJECT ALLOCATION - $300,000) 16 (LAND ALLOCATION - $20,000) 17 (DESIGN AND CONTINGENCIES - $200,000) 18 (10) LOWER TOWAMENSING TOWNSHIP, COVERED 19 BRIDGE ROAD OVER BUCKWA CREEK, BRIDGE 20 REHABILITATION 500,000 21 (BASE PROJECT ALLOCATION - $300,000) 22 (DESIGN AND CONTINGENCIES - $200,000) 23 (11) KIDDER TOWNSHIP, SR 1005 OVER LEHIGH 24 RIVER, BRIDGE REPLACEMENT 5,550,000 25 (BASE PROJECT ALLOCATION - $3,500,000) 26 (LAND ALLOCATION - $50,000) 27 (DESIGN AND CONTINGENCIES - $2,000,000) 28 (12) TOWAMENSING TOWNSHIP, POHOPOCO ROAD 29 OVER PINE RUN/BELTZVILLE LAKE, BRIDGE 30 REHABILITATION 2,100,000 20080S1503B2376 - 81 -
1 (BASE PROJECT ALLOCATION - $1,300,000) 2 (DESIGN AND CONTINGENCIES - $800,000) 3 (13) PENN FOREST TOWNSHIP, SMITH ROAD OVER 4 STONEY CREEK, BRIDGE REPLACEMENT 520,000 5 (BASE PROJECT ALLOCATION - $300,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $200,000) 8 (B) STATE BRIDGES 9 (1) SR 4014, ROCKPORT ROAD OVER INDIAN 10 RUN, LEHIGH TOWNSHIP, BRIDGE 11 REPLACEMENT 1,625,000 12 (BASE PROJECT ALLOCATION - $1,100,000) 13 (LAND ALLOCATION - $75,000) 14 (DESIGN AND CONTINGENCIES - $450,000) 15 SECTION 18. CENTRE COUNTY. 16 (A) LOCAL BRIDGES (RESERVED) 17 (B) STATE BRIDGES 18 (1) SR 3001 OVER BRANCH OF SPRING CREEK, 19 BENNER TOWNSHIP, BRIDGE REPLACEMENT 34,000 20 (BASE PROJECT ALLOCATION - $34,000) 21 (2) SR 1002 OVER BRANCH OF LITTLE MARSH 22 CREEK, BOGGS TOWNSHIP, BRIDGE 23 REPLACEMENT 300,000 24 (BASE PROJECT ALLOCATION - $200,000) 25 (LAND ALLOCATION - $50,000) 26 (DESIGN AND CONTINGENCIES - $50,000) 27 (3) SR 1002, BRIDGE NO.9580 OVER LITTLE 28 MARSH CREEK, CURTIN TOWNSHIP, BRIDGE 29 REPLACEMENT 2,200,000 30 (BASE PROJECT ALLOCATION - $1,500,000) 20080S1503B2376 - 82 -
1 (LAND ALLOCATION - $100,000) 2 (DESIGN AND CONTINGENCIES - $600,000) 3 (4) SR 1002, BRIDGE NO.9581 OVER LITTLE 4 MARSH CREEK, CURTIN TOWNSHIP, BRIDGE 5 REPLACEMENT 2,200,000 6 (BASE PROJECT ALLOCATION - $1,500,000) 7 (LAND ALLOCATION - $100,000) 8 (DESIGN AND CONTINGENCIES - $600,000) 9 (5) SR 1002, BRIDGE NO.9582 OVER MARSH 10 CREEK, CURTIN TOWNSHIP, BRIDGE 11 REHABILITATION 1,300,000 12 (BASE PROJECT ALLOCATION - $850,000) 13 (LAND ALLOCATION - $100,000) 14 (DESIGN AND CONTINGENCIES - $350,000) 15 (6) SR 0045 OVER SPRUCE CREEK, FERGUSON 16 TOWNSHIP, BRIDGE REPLACEMENT 320,000 17 (BASE PROJECT ALLOCATION - $200,000) 18 (LAND ALLOCATION - $60,000) 19 (DESIGN AND CONTINGENCIES - $60,000) 20 (7) SR 2012 OVER PENNS CREEK, GREGG 21 TOWNSHIP, BRIDGE REPLACEMENT 380,000 22 (BASE PROJECT ALLOCATION - $240,000) 23 (LAND ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $120,000) 25 (8) SR 2004 OVER BRANCH OF CEDAR RUN, 26 HARRIS TOWNSHIP, BRIDGE REPLACEMENT 215,000 27 (BASE PROJECT ALLOCATION - $140,000) 28 (DESIGN AND CONTINGENCIES - $75,000) 29 (9) SR 1002, BRIDGE NO.9590 OVER MARSH 30 CREEK, LIBERTY TOWNSHIP, BRIDGE 20080S1503B2376 - 83 -
1 REPLACEMENT 1,000,000 2 (BASE PROJECT ALLOCATION - $300,000) 3 (LAND ALLOCATION - $100,000) 4 (DESIGN AND CONTINGENCIES - $600,000) 5 (10) SR 3045, TR T-28 OVER SR 0322, US 6 322, PATTON TOWNSHIP, BRIDGE 7 REPLACEMENT 3,650,000 8 (BASE PROJECT ALLOCATION - $3,000,000) 9 (LAND ALLOCATION - $200,000) 10 (DESIGN AND CONTINGENCIES - $450,000) 11 (11) SR 0045 OVER BRANCH OF ELK CREEK, 12 PENN TOWNSHIP, BRIDGE REPLACEMENT 500,000 13 (BASE PROJECT ALLOCATION - $500,000) 14 (12) SR 3027 OVER BRANCH OF TROUT RUN, 15 RUSH TOWNSHIP, BRIDGE REPLACEMENT 275,000 16 (BASE PROJECT ALLOCATION - $200,000) 17 (DESIGN AND CONTINGENCIES - $75,000) 18 (13) SR 4002, BRIDGE NO.9775 OVER NORTH 19 FORK OF BEECH CREEK, SNOW SHOE 20 TOWNSHIP, BRIDGE REPLACEMENT 1,300,000 21 (BASE PROJECT ALLOCATION - $600,000) 22 (LAND ALLOCATION - $100,000) 23 (DESIGN AND CONTINGENCIES - $600,000) 24 (14) SR 4002, BRIDGE NO.9780 OVER NORTH 25 FORK OF BEECH CREEK, SNOW SHOE 26 TOWNSHIP, BRIDGE REPLACEMENT 2,951,000 27 (BASE PROJECT ALLOCATION - $2,069,000) 28 (LAND ALLOCATION - $270,000) 29 (DESIGN AND CONTINGENCIES - $612,000) 30 (15) WADDLE ROAD OVER US 322, PATTON 20080S1503B2376 - 84 -
1 TOWNSHIP, BRIDGE REPLACEMENT 15,000,000 2 SECTION 19. CHESTER COUNTY. 3 (A) LOCAL BRIDGES 4 (1) WESTTOWN TOWNSHIP, OAKBOURNE ROAD, T- 5 359 OVER GOOSE CREEK, BRIDGE 6 REPLACEMENT 480,000 7 (BASE PROJECT ALLOCATION - $480,000) 8 (2) NORTH COVENTRY TOWNSHIP, T-525 OVER 9 PIGEON CREEK, BRIDGE REPLACEMENT 560,000 10 (BASE PROJECT ALLOCATION - $560,000) 11 (3) EAST BRANDYWINE TOWNSHIP, T-461 OVER 12 BRANDYWINE CREEK, BRIDGE 13 REHABILITATION 150,000 14 (BASE PROJECT ALLOCATION - $150,000) 15 (4) WEST BRANDYWINE TOWNSHIP, T-443 OVER 16 BRANDYWINE RIVER, BRIDGE 17 REHABILITATION 75,000 18 (BASE PROJECT ALLOCATION - $75,000) 19 (5) CAIN TOWNSHIP, T-411 OVER BEAVER 20 CREEK, BRIDGE REPLACEMENT 600,000 21 (BASE PROJECT ALLOCATION - $600,000) 22 (6) EAST BRANDYWINE TOWNSHIP, T-424 OVER 23 BEAVER CREEK, BRIDGE REPLACEMENT 800,000 24 (BASE PROJECT ALLOCATION - $800,000) 25 (B) STATE BRIDGES 26 (1) SR 0322, BRANDYWINE AVENUE OVER EAST 27 BRANCH OF BRANDYWINE CREEK, EAST CALN 28 TOWNSHIP, BRIDGE REHABILITATION 63,000 29 (BASE PROJECT ALLOCATION - $11,000) 30 (LAND ALLOCATION - $1,000) 20080S1503B2376 - 85 -
1 (DESIGN AND CONTINGENCIES - $51,000) 2 (2) SR 1035, LINFIELD ROAD, OVER 3 SCHUYLKILL RIVER, EAST COVENTRY 4 TOWNSHIP, BRIDGE REHABILITATION 63,000 5 (BASE PROJECT ALLOCATION - $11,000) 6 (LAND ALLOCATION - $1,000) 7 (DESIGN AND CONTINGENCIES - $51,000) 8 (3) SR 3038, BURNT HILL ROAD OVER BRANCH 9 OF RED CLAY CREEK, KENNETT TOWNSHIP, 10 BRIDGE REHABILITATION 1,389,000 11 (BASE PROJECT ALLOCATION - $96,000) 12 (LAND ALLOCATION - $31,000) 13 (DESIGN AND CONTINGENCIES - $1,262,000) 14 (4) BROAD RUN ROAD OVER EAST BRANCH OF 15 WHITE CLAY CREEK, LONDON BRITAIN 16 TOWNSHIP, BRIDGE REPLACEMENT 2,592,000 17 (BASE PROJECT ALLOCATION - $2,000,000) 18 (LAND ALLOCATION - $100,000) 19 (DESIGN AND CONTINGENCIES - $492,000) 20 (5) SR 3044, EWING ROAD OVER MIDDLE BRANCH 21 OF WHITE CLAY CREEK, LONDON GROVE 22 TOWNSHIP, BRIDGE REPLACEMENT 2,000,000 23 (BASE PROJECT ALLOCATION - $546,000) 24 (LAND ALLOCATION - $35,000) 25 (DESIGN AND CONTINGENCIES - $1,419,000) 26 (6) SR 4041, HARMONYVILLE ROAD OVER ROCK 27 RUN, NORTH COVENTRY TOWNSHIP, BRIDGE 28 REHABILITATION 63,000 29 (BASE PROJECT ALLOCATION - $11,000) 30 (LAND ALLOCATION - $1,000) 20080S1503B2376 - 86 -
1 (DESIGN AND CONTINGENCIES - $51,000) 2 (7) SR 1101, KEIM STREET OVER POTTSTOWN 3 BYPASS, NORTH COVENTRY TOWNSHIP, BRIDGE 4 REHABILITATION 6,210,000 5 (BASE PROJECT ALLOCATION - $5,560,000) 6 (LAND ALLOCATION - $100,000) 7 (DESIGN AND CONTINGENCIES - $550,000) 8 (8) SR 0422, POTTSTOWN BYPASS OVER RAMP G 9 AND RAMP H, NORTH COVENTRY TOWNSHIP, 10 BRIDGE REHABILITATION 6,210,000 11 (BASE PROJECT ALLOCATION - $5,560,000) 12 (LAND ALLOCATION - $100,000) 13 (DESIGN AND CONTINGENCIES - $550,000) 14 (9) SR 0052, LENAPE UNIONVILLE ROAD OVER 15 BRANCH OF POCOPSON CREEK, POCOPSON 16 TOWNSHIP, BRIDGE REHABILITATION 63,000 17 (BASE PROJECT ALLOCATION - $11,000) 18 (LAND ALLOCATION - $1,000) 19 (DESIGN AND CONTINGENCIES - $51,000) 20 (10) SR 0282, CREEK ROAD, BRIDGE NO.10179 21 OVER EAST BRANCH OF BRANDYWINE CREEK, 22 WALLACE TOWNSHIP, BRIDGE REPLACEMENT 2,000,000 23 (BASE PROJECT ALLOCATION - $575,000) 24 (LAND ALLOCATION - $60,000) 25 (DESIGN AND CONTINGENCIES - $1,365,000) 26 (11) SR 0282, CREEK ROAD, BRIDGE NO.10180 27 OVER EAST BRANCH OF BRANDYWINE CREEK, 28 WALLACE TOWNSHIP, BRIDGE REPLACEMENT 2,000,000 29 (BASE PROJECT ALLOCATION - $460,000) 30 (LAND ALLOCATION - $30,000) 20080S1503B2376 - 87 -
1 (DESIGN AND CONTINGENCIES - $1,510,000) 2 (12) SR 4008, INDIAN RUN DRIVE OVER INDIAN 3 RUN, WALLACE TOWNSHIP, BRIDGE 4 REPLACEMENT 1,500,000 5 (BASE PROJECT ALLOCATION - $518,000) 6 (LAND ALLOCATION - $25,000) 7 (DESIGN AND CONTINGENCIES - $957,000) 8 (13) SR 4018 OVER PINE CREEK, WARWICK 9 TOWNSHIP, BRIDGE REPLACEMENT 1,725,000 10 (BASE PROJECT ALLOCATION - $1,000,000) 11 (LAND ALLOCATION - $150,000) 12 (DESIGN AND CONTINGENCIES - $575,000) 13 (14) SR 3027 OVER WEST BRANCH OF 14 BRANDYWINE CREEK, WEST BRADFORD 15 TOWNSHIP, BRIDGE REHABILITATION 63,000 16 (BASE PROJECT ALLOCATION - $11,000) 17 (LAND ALLOCATION - $1,000) 18 (DESIGN AND CONTINGENCIES - $51,000) 19 (15) SR 4011, SWINEHART ROAD OVER BEAVER 20 CREEK, WEST BRANDYWINE TOWNSHIP, BRIDGE 21 REHABILITATION 63,000 22 (BASE PROJECT ALLOCATION - $11,000) 23 (LAND ALLOCATION - $1,000) 24 (DESIGN AND CONTINGENCIES - $51,000) 25 (16) SR 0401, CONESTOGA ROAD OVER BRANCH 26 OF PICKERING CREEK, WEST VINCENT 27 TOWNSHIP, BRIDGE REHABILITATION 63,000 28 (BASE PROJECT ALLOCATION - $11,000) 29 (LAND ALLOCATION - $1,000) 30 (DESIGN AND CONTINGENCIES - $51,000) 20080S1503B2376 - 88 -
1 (17) SR 3070, LANCASTER AVENUE OVER BRANCH 2 OF VALLEY CREEK, WEST WHITELAND 3 TOWNSHIP, BRIDGE REHABILITATION 1,389,000 4 (BASE PROJECT ALLOCATION - $96,000) 5 (LAND ALLOCATION - $31,000) 6 (DESIGN AND CONTINGENCIES - $1,262,000) 7 (18) SR 3100 OVER WEST CHESTER BYPASS, 8 WEST WHITELAND TOWNSHIP, BRIDGE 9 REHABILITATION 63,000 10 (BASE PROJECT ALLOCATION - $11,000) 11 (LAND ALLOCATION - $1,000) 12 (DESIGN AND CONTINGENCIES - $51,000) 13 SECTION 20. CLARION COUNTY. 14 (A) LOCAL BRIDGES (RESERVED) 15 (B) STATE BRIDGES 16 (1) SR 0208 OVER TRIBUTARY OF BEAVER 17 CREEK, BEAVER TOWNSHIP, BRIDGE 18 REPLACEMENT 250,000 19 (BASE PROJECT ALLOCATION - $70,000) 20 (LAND ALLOCATION - $40,000) 21 (DESIGN AND CONTINGENCIES - $140,000) 22 (2) SR 0338 OVER TRIBUTARY OF CANOE CREEK, 23 BEAVER TOWNSHIP, BRIDGE REPLACEMENT 247,000 24 (BASE PROJECT ALLOCATION - $67,000) 25 (LAND ALLOCATION - $40,000) 26 (DESIGN AND CONTINGENCIES - $140,000) 27 (3) SR 1007 OVER TRIBUTARY OF BRUSH RUN, 28 CLARION TOWNSHIP, BRIDGE REPLACEMENT 242,000 29 (BASE PROJECT ALLOCATION - $62,000) 30 (LAND ALLOCATION - $40,000) 20080S1503B2376 - 89 -
1 (DESIGN AND CONTINGENCIES - $140,000) 2 (4) SR 0322 OVER TRIBUTARY OF DEER CREEK, 3 ELK TOWNSHIP, BRIDGE REPLACEMENT 293,000 4 (BASE PROJECT ALLOCATION - $113,000) 5 (LAND ALLOCATION - $40,000) 6 (DESIGN AND CONTINGENCIES - $140,000) 7 (5) SR 0322 OVER DEER CREEK, ELK TOWNSHIP, 8 BRIDGE REPLACEMENT 471,000 9 (BASE PROJECT ALLOCATION - $291,000) 10 (LAND ALLOCATION - $40,000) 11 (DESIGN AND CONTINGENCIES - $140,000) 12 (6) SR 0036 OVER HENRY RUN, FARMINGTON 13 TOWNSHIP, BRIDGE REHABILITATION 233,000 14 (BASE PROJECT ALLOCATION - $53,000) 15 (LAND ALLOCATION - $40,000) 16 (DESIGN AND CONTINGENCIES - $140,000) 17 (7) SR 0036 OVER TOBY CREEK, FARMINGTON 18 TOWNSHIP, BRIDGE REPLACEMENT 267,000 19 (BASE PROJECT ALLOCATION - $87,000) 20 (LAND ALLOCATION - $40,000) 21 (DESIGN AND CONTINGENCIES - $140,000) 22 (8) SR 0036 OVER BARLETT RUN, FARMINGTON 23 TOWNSHIP, BRIDGE REPLACEMENT 251,000 24 (BASE PROJECT ALLOCATION - $71,000) 25 (LAND ALLOCATION - $40,000) 26 (DESIGN AND CONTINGENCIES - $140,000) 27 (9) SR 0066 OVER TOMS RUN, FARMINGTON 28 TOWNSHIP, BRIDGE REPLACEMENT 219,000 29 (BASE PROJECT ALLOCATION - $39,000) 30 (LAND ALLOCATION - $40,000) 20080S1503B2376 - 90 -
1 (DESIGN AND CONTINGENCIES - $140,000) 2 (10) SR 1015 OVER BROWNS RUN, FARMINGTON 3 TOWNSHIP, BRIDGE REPLACEMENT 228,000 4 (BASE PROJECT ALLOCATION - $48,000) 5 (LAND ALLOCATION - $40,000) 6 (DESIGN AND CONTINGENCIES - $140,000) 7 (11) SR 4004 OVER LICKING CREEK, 8 FARMINGTON TOWNSHIP, BRIDGE 9 REPLACEMENT 241,000 10 (BASE PROJECT ALLOCATION - $61,000) 11 (LAND ALLOCATION - $40,000) 12 (DESIGN AND CONTINGENCIES - $140,000) 13 (12) SR 4004, BRIDGE NO.11080 OVER 14 TRIBUTARY OF LICKING CREEK, FARMINGTON 15 TOWNSHIP, BRIDGE REPLACEMENT 271,000 16 (BASE PROJECT ALLOCATION - $91,000) 17 (LAND ALLOCATION - $40,000) 18 (DESIGN AND CONTINGENCIES - $140,000) 19 (13) SR 4015 OVER LICKING CREEK, KNOX 20 TOWNSHIP, BRIDGE REPLACEMENT 409,000 21 (BASE PROJECT ALLOCATION - $229,000) 22 (LAND ALLOCATION - $40,000) 23 (DESIGN AND CONTINGENCIES - $140,000) 24 (14) SR 0058 OVER TRIBUTARY OF CLARION 25 RIVER, LICKING TOWNSHIP, BRIDGE 26 REPLACEMENT 230,000 27 (BASE PROJECT ALLOCATION - $50,000) 28 (LAND ALLOCATION - $40,000) 29 (DESIGN AND CONTINGENCIES - $140,000) 30 (15) SR 0058 OVER ROCKS RUN, LICKING 20080S1503B2376 - 91 -
1 TOWNSHIP, BRIDGE REPLACEMENT 206,000 2 (BASE PROJECT ALLOCATION - $26,000) 3 (LAND ALLOCATION - $40,000) 4 (DESIGN AND CONTINGENCIES - $140,000) 5 (16) SR 2009 OVER CHERRY RUN, LICKING 6 TOWNSHIP, BRIDGE REPLACEMENT 354,000 7 (BASE PROJECT ALLOCATION - $174,000) 8 (LAND ALLOCATION - $40,000) 9 (DESIGN AND CONTINGENCIES - $140,000) 10 (17) SR 0066 OVER GLADE RUN, LIMESTONE 11 TOWNSHIP, BRIDGE REPLACEMENT 223,000 12 (BASE PROJECT ALLOCATION - $43,000) 13 (LAND ALLOCATION - $40,000) 14 (DESIGN AND CONTINGENCIES - $140,000) 15 (18) SR 2001 OVER TRIBUTARY OF LITTLE 16 PINEY CREEK, LIMESTONE TOWNSHIP, BRIDGE 17 REPLACEMENT 252,000 18 (BASE PROJECT ALLOCATION - $72,000) 19 (LAND ALLOCATION - $40,000) 20 (DESIGN AND CONTINGENCIES - $140,000) 21 (19) SR 2001 OVER PINEY CREEK, LIMESTONE 22 TOWNSHIP, BRIDGE REHABILITATION 195,000 23 (BASE PROJECT ALLOCATION - $150,000) 24 (LAND ALLOCATION - $15,000) 25 (DESIGN AND CONTINGENCIES - $30,000) 26 (20) SR 2005 OVER PINEY CREEK, LIMESTONE 27 TOWNSHIP, BRIDGE REPLACEMENT 220,000 28 (BASE PROJECT ALLOCATION - $40,000) 29 (LAND ALLOCATION - $40,000) 30 (DESIGN AND CONTINGENCIES - $140,000) 20080S1503B2376 - 92 -
1 (21) SR 2015 OVER LITTLE PINEY CREEK, 2 LIMESTONE TOWNSHIP, BRIDGE 3 REHABILITATION 235,000 4 (BASE PROJECT ALLOCATION - $150,000) 5 (LAND ALLOCATION - $15,000) 6 (DESIGN AND CONTINGENCIES - $70,000) 7 (22) SR 0861 OVER FIDDLERS RUN, MADISON 8 TOWNSHIP, BRIDGE REPLACEMENT 339,000 9 (BASE PROJECT ALLOCATION - $159,000) 10 (LAND ALLOCATION - $40,000) 11 (DESIGN AND CONTINGENCIES - $140,000) 12 (23) SR 0861, BRIDGE NO.10996 OVER WILDCAT 13 RUN, MADISON TOWNSHIP, BRIDGE 14 REPLACEMENT 445,000 15 (BASE PROJECT ALLOCATION - $265,000) 16 (LAND ALLOCATION - $40,000) 17 (DESIGN AND CONTINGENCIES - $140,000) 18 (24) SR 0861, BRIDGE NO.10997 OVER WILDCAT 19 RUN, MADISON TOWNSHIP, BRIDGE 20 REPLACEMENT 338,000 21 (BASE PROJECT ALLOCATION - $158,000) 22 (LAND ALLOCATION - $40,000) 23 (DESIGN AND CONTINGENCIES - $140,000) 24 (25) SR 3004 OVER KISSINGER RUN, MADISON 25 TOWNSHIP, BRIDGE REPLACEMENT 233,000 26 (BASE PROJECT ALLOCATION - $53,000) 27 (LAND ALLOCATION - $40,000) 28 (DESIGN AND CONTINGENCIES - $140,000) 29 (26) SR 0368 OVER TRIBUTARY OF ALLEGHENY 30 RIVER, PERRY TOWNSHIP, BRIDGE 20080S1503B2376 - 93 -
1 REPLACEMENT 291,000 2 (BASE PROJECT ALLOCATION - $111,000) 3 (LAND ALLOCATION - $40,000) 4 (DESIGN AND CONTINGENCIES - $140,000) 5 (27) SR 2011 OVER LITTLE LICKING CREEK, 6 PINEY TOWNSHIP, BRIDGE REPLACEMENT 276,000 7 (BASE PROJECT ALLOCATION - $96,000) 8 (LAND ALLOCATION - $40,000) 9 (DESIGN AND CONTINGENCIES - $140,000) 10 (28) SR 0028 OVER PINE CREEK, REDBANK 11 TOWNSHIP, BRIDGE REPLACEMENT 405,000 12 (BASE PROJECT ALLOCATION - $350,000) 13 (LAND ALLOCATION - $15,000) 14 (DESIGN AND CONTINGENCIES - $40,000) 15 (29) SR 8002 OVER RICHEY RUN, RICHLAND 16 TOWNSHIP, BRIDGE REPLACEMENT 346,000 17 (BASE PROJECT ALLOCATION - $166,000) 18 (LAND ALLOCATION - $40,000) 19 (DESIGN AND CONTINGENCIES - $140,000) 20 (30) SR 4007 OVER TURKEY RUN, SALEM 21 TOWNSHIP, BRIDGE REPLACEMENT 206,000 22 (BASE PROJECT ALLOCATION - $26,000) 23 (LAND ALLOCATION - $40,000) 24 (DESIGN AND CONTINGENCIES - $140,000) 25 (31) SR 0058 OVER HODIL RUN, SLIGO 26 BOROUGH, BRIDGE REPLACEMENT 240,000 27 (BASE PROJECT ALLOCATION - $60,000) 28 (LAND ALLOCATION - $40,000) 29 (DESIGN AND CONTINGENCIES - $140,000) 30 (32) SR 3002 OVER BLACK FOX RUN, TOBY 20080S1503B2376 - 94 -
1 TOWNSHIP, BRIDGE REPLACEMENT 260,000 2 (BASE PROJECT ALLOCATION - $80,000) 3 (LAND ALLOCATION - $40,000) 4 (DESIGN AND CONTINGENCIES - $140,000) 5 (33) SR 3012 OVER TRIBUTARY OF CHERRY RUN, 6 TOBY TOWNSHIP, BRIDGE REPLACEMENT 247,000 7 (BASE PROJECT ALLOCATION - $67,000) 8 (LAND ALLOCATION - $40,000) 9 (DESIGN AND CONTINGENCIES - $140,000) 10 (34) SR 4004, BRIDGE NO.11078 OVER 11 TRIBUTARY OF LICKING CREEK, WASHINGTON 12 TOWNSHIP, BRIDGE REPLACEMENT 255,000 13 (BASE PROJECT ALLOCATION - $75,000) 14 (LAND ALLOCATION - $40,000) 15 (DESIGN AND CONTINGENCIES - $140,000) 16 (35) SR 4015 OVER MAHLES RUN, WASHINGTON 17 TOWNSHIP, BRIDGE REPLACEMENT 240,000 18 (BASE PROJECT ALLOCATION - $60,000) 19 (LAND ALLOCATION - $40,000) 20 (DESIGN AND CONTINGENCIES - $140,000) 21 (36) SR 4017 OVER LITTLE TIONESTA CREEK, 22 WASHINGTON TOWNSHIP, BRIDGE 23 REPLACEMENT 273,000 24 (BASE PROJECT ALLOCATION - $93,000) 25 (LAND ALLOCATION - $40,000) 26 (DESIGN AND CONTINGENCIES - $140,000) 27 (37) SR 4035 OVER MAHLES RUN, WASHINGTON 28 TOWNSHIP, BRIDGE REPLACEMENT 239,000 29 (BASE PROJECT ALLOCATION - $59,000) 30 (LAND ALLOCATION - $40,000) 20080S1503B2376 - 95 -
1 (DESIGN AND CONTINGENCIES - $140,000) 2 (38) SR 4035 OVER EAST BRANCH OF HEMLOCK 3 RUN, WASHINGTON TOWNSHIP, BRIDGE 4 REPLACEMENT 253,000 5 (BASE PROJECT ALLOCATION - $73,000) 6 (LAND ALLOCATION - $40,000) 7 (DESIGN AND CONTINGENCIES - $140,000) 8 SECTION 21. CLEARFIELD COUNTY. 9 (A) LOCAL BRIDGES 10 (1) CITY OF DUBOIS, WASHINGTON AVENUE OVER 11 PENTZ RUN, BRIDGE REPLACEMENT 451,000 12 (BASE PROJECT ALLOCATION - $371,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $70,000) 15 (2) CITY OF DUBOIS, WEBER AVENUE OVER 16 PENTZ RUN, BRIDGE REPLACEMENT 363,000 17 (BASE PROJECT ALLOCATION - $287,000) 18 (LAND ALLOCATION - $10,000) 19 (DESIGN AND CONTINGENCIES - $66,000) 20 (3) SANDY TOWNSHIP, SEWAGE TREATMENT PLANT 21 ACCESS ROAD OVER SANDY LICK CREEK, 22 BRIDGE REHABILITATION 115,000 23 (BASE PROJECT ALLOCATION - $100,000) 24 (DESIGN AND CONTINGENCIES - $15,000) 25 (4) CITY OF DUBOIS, PARK AVENUE OVER PENTZ 26 RUN, BRIDGE REHABILITATION 57,000 27 (BASE PROJECT ALLOCATION - $50,000) 28 (DESIGN AND CONTINGENCIES - $7,000) 29 (5) CITY OF DUBOIS, BEAVER DRIVE OVER 30 MCCRACKEN RUN, BRIDGE REHABILITATION 86,000 20080S1503B2376 - 96 -
1 (BASE PROJECT ALLOCATION - $80,000) 2 (DESIGN AND CONTINGENCIES - $6,000) 3 (6) CITY OF DUBOIS, SPRUCE ALLEY OVER 4 PENTZ RUN, BRIDGE REHABILITATION 92,000 5 (BASE PROJECT ALLOCATION - $80,000) 6 (DESIGN AND CONTINGENCIES - $12,000) 7 (7) CITY OF DUBOIS, JUNIATA STREET OVER 8 CLEAR RUN, BRIDGE REPLACEMENT 475,000 9 (BASE PROJECT ALLOCATION - $400,000) 10 (LAND ALLOCATION - $20,000) 11 (DESIGN AND CONTINGENCIES - $55,000) 12 (8) CITY OF DUBOIS, FRANKLIN STREET OVER 13 PENTZ RUN, BRIDGE RESTORATION 125,000 14 (BASE PROJECT ALLOCATION - $110,000) 15 (DESIGN AND CONTINGENCIES - $15,000) 16 (9) BRADY TOWNSHIP, TR-341 OVER UNNAMED 17 TRIBUTARY OF EAST BRANCH OF 18 SINNEMAHONING CREEK, BRIDGE 19 REPLACEMENT 12,000 20 (BASE PROJECT ALLOCATION - $10,000) 21 (DESIGN AND CONTINGENCIES - $2,000) 22 (B) STATE BRIDGES 23 (1) SR 0219 OVER LITTLE ANDERSON CREEK, 24 BLOOM TOWNSHIP, BRIDGE REPLACEMENT 1,725,000 25 (BASE PROJECT ALLOCATION - $1,100,000) 26 (LAND ALLOCATION - $125,000) 27 (DESIGN AND CONTINGENCIES - $500,000) 28 (2) SR 3014 OVER NORTH CAMP RUN, CHEST 29 TOWNSHIP, BRIDGE REPLACEMENT 296,000 30 (BASE PROJECT ALLOCATION - $196,000) 20080S1503B2376 - 97 -
1 (LAND ALLOCATION - $30,000) 2 (DESIGN AND CONTINGENCIES - $70,000) 3 (3) SR 0080, BRIDGE NO.11323 OVER SR 0053, 4 PA 53, COOPER TOWNSHIP, BRIDGE 5 REHABILITATION 215,000 6 (BASE PROJECT ALLOCATION - $200,000) 7 (DESIGN AND CONTINGENCIES - $15,000) 8 (4) SR 0080, BRIDGE NO.11324 OVER SR 0053, 9 PA 53, COOPER TOWNSHIP, BRIDGE 10 REHABILITATION 215,000 11 (BASE PROJECT ALLOCATION - $200,000) 12 (DESIGN AND CONTINGENCIES - $15,000) 13 (5) SR 0080, BRIDGE NO.11326 OVER SR 2037, 14 COOPER TOWNSHIP, BRIDGE REHABILITATION 215,000 15 (BASE PROJECT ALLOCATION - $200,000) 16 (DESIGN AND CONTINGENCIES - $15,000) 17 (6) SR 0080, BRIDGE NO.11327 OVER SR 2037, 18 COOPER TOWNSHIP, BRIDGE REHABILITATION 215,000 19 (BASE PROJECT ALLOCATION - $200,000) 20 (DESIGN AND CONTINGENCIES - $15,000) 21 (7) SR 2035 OVER I-80, COOPER TOWNSHIP, 22 BRIDGE REHABILITATION 260,000 23 (BASE PROJECT ALLOCATION - $240,000) 24 (DESIGN AND CONTINGENCIES - $20,000) 25 (8) SR 1009, BRIDGE NO.11660 OVER I-80, 26 GRAHAM TOWNSHIP, BRIDGE REHABILITATION 260,000 27 (BASE PROJECT ALLOCATION - $240,000) 28 (DESIGN AND CONTINGENCIES - $20,000) 29 (9) SR 1009, BRIDGE NO.11661 OVER I-80, 30 GRAHAM TOWNSHIP, BRIDGE REHABILITATION 260,000 20080S1503B2376 - 98 -
1 (BASE PROJECT ALLOCATION - $240,000) 2 (DESIGN AND CONTINGENCIES - $20,000) 3 (10) SR 0153 OVER BENNETT BRANCH, HUSTON 4 TOWNSHIP, BRIDGE REPLACEMENT 1,400,000 5 (BASE PROJECT ALLOCATION - $1,000,000) 6 (LAND ALLOCATION - $200,000) 7 (DESIGN AND CONTINGENCIES - $200,000) 8 (11) SR 4021 OVER NEGRO HOLLOW, HUSTON 9 TOWNSHIP, BRIDGE REPLACEMENT 180,000 10 (BASE PROJECT ALLOCATION - $110,000) 11 (LAND ALLOCATION - $30,000) 12 (DESIGN AND CONTINGENCIES - $40,000) 13 (12) SR 3005 OVER SOUTH WITMER RUN, IRVONA 14 BOROUGH, BRIDGE REPLACEMENT 616,000 15 (BASE PROJECT ALLOCATION - $464,000) 16 (LAND ALLOCATION - $30,000) 17 (DESIGN AND CONTINGENCIES - $122,000) 18 (13) SR 1015, TR T-519 OVER I-80, LAWRENCE 19 TOWNSHIP, BRIDGE REHABILITATION 260,000 20 (BASE PROJECT ALLOCATION - $240,000) 21 (DESIGN AND CONTINGENCIES - $20,000) 22 (14) SR 0153, BRIDGE NO.11361 OVER I-80, 23 PINE TOWNSHIP, BRIDGE REHABILITATION 260,000 24 (BASE PROJECT ALLOCATION - $240,000) 25 (DESIGN AND CONTINGENCIES - $20,000) 26 (15) SR 0153, BRIDGE NO.11362 OVER I-80, 27 PINE TOWNSHIP, BRIDGE REHABILITATION 260,000 28 (BASE PROJECT ALLOCATION - $240,000) 29 (DESIGN AND CONTINGENCIES - $20,000) 30 (16) SR 0255 OVER SANDY LICK CREEK, SANDY 20080S1503B2376 - 99 -
1 TOWNSHIP, BRIDGE REPLACEMENT 900,000 2 (BASE PROJECT ALLOCATION - $500,000) 3 (LAND ALLOCATION - $200,000) 4 (DESIGN AND CONTINGENCIES - $200,000) 5 (17) SR 4015 OVER I-80, SANDY TOWNSHIP, 6 BRIDGE REHABILITATION 260,000 7 (BASE PROJECT ALLOCATION - $240,000) 8 (DESIGN AND CONTINGENCIES - $20,000) 9 (18) SR 0830, PA 830 OVER SLAB RUN, SANDY 10 TOWNSHIP, BRIDGE REHABILITATION 1,200,000 11 (BASE PROJECT ALLOCATION - $1,164,000) 12 (LAND ALLOCATION - $4,000) 13 (DESIGN AND CONTINGENCIES - $32,000) 14 (19) SR 0830, PA 830 OVER WOLF RUN, SANDY 15 TOWNSHIP, BRIDGE REPLACEMENT 5,396,000 16 (BASE PROJECT ALLOCATION - $5,237,000) 17 (LAND ALLOCATION - $15,000) 18 (DESIGN AND CONTINGENCIES - $144,000) 19 (20) SR 2013 OVER BEAVER RUN, WOODWARD 20 TOWNSHIP, BRIDGE REPLACEMENT 268,000 21 (BASE PROJECT ALLOCATION - $180,000) 22 (LAND ALLOCATION - $30,000) 23 (DESIGN AND CONTINGENCIES - $58,000) 24 (21) SR 4019 OVER JUNIATA RUN, CITY OF 25 DUBOIS, BRIDGE REPLACEMENT 1,000,000 26 (BASE PROJECT ALLOCATION - $1,000,000) 27 SECTION 22. CLINTON COUNTY. 28 (A) LOCAL BRIDGES (RESERVED) 29 (B) STATE BRIDGES 30 (1) SR 0477 OVER DRY RUN, LAMAR TOWNSHIP, 20080S1503B2376 - 100 -
1 BRIDGE REPLACEMENT 1,150,000 2 (BASE PROJECT ALLOCATION - $750,000) 3 (LAND ALLOCATION - $200,000) 4 (DESIGN AND CONTINGENCIES - $200,000) 5 (2) SR 4001 OVER BEAVER DAM RUN, LEIDY 6 TOWNSHIP, BRIDGE REPLACEMENT 1,100,000 7 (BASE PROJECT ALLOCATION - $750,000) 8 (LAND ALLOCATION - $100,000) 9 (DESIGN AND CONTINGENCIES - $250,000) 10 (3) SR 4001 OVER WALTERS RUN, LEIDY 11 TOWNSHIP, BRIDGE REPLACEMENT 900,000 12 (BASE PROJECT ALLOCATION - $500,000) 13 (LAND ALLOCATION - $200,000) 14 (DESIGN AND CONTINGENCIES - $200,000) 15 (4) SR 0880 OVER SPANGLER RUN, LOGAN 16 TOWNSHIP, BRIDGE REPLACEMENT 225,000 17 (BASE PROJECT ALLOCATION - $150,000) 18 (DESIGN AND CONTINGENCIES - $75,000) 19 (5) SR 2002 OVER SPANGLER RUN, LOGAN 20 TOWNSHIP, BRIDGE REPLACEMENT 300,000 21 (BASE PROJECT ALLOCATION - $200,000) 22 (DESIGN AND CONTINGENCIES - $100,000) 23 (6) SR 0144 OVER HALLS RUN, NOYES 24 TOWNSHIP, BRIDGE REPLACEMENT 250,000 25 (BASE PROJECT ALLOCATION - $150,000) 26 (LAND ALLOCATION - $100,000) 27 (7) SR 0064 OVER BIG FISHING CREEK, PORTER 28 TOWNSHIP, BRIDGE REPLACEMENT 4,200,000 29 (BASE PROJECT ALLOCATION - $3,300,000) 30 (LAND ALLOCATION - $300,000) 20080S1503B2376 - 101 -
1 (DESIGN AND CONTINGENCIES - $600,000) 2 (8) SR 2004 OVER FISHING CREEK, PORTER 3 TOWNSHIP, BRIDGE REHABILITATION 1,050,000 4 (BASE PROJECT ALLOCATION - $500,000) 5 (LAND ALLOCATION - $100,000) 6 (DESIGN AND CONTINGENCIES - $450,000) 7 SECTION 23. COLUMBIA COUNTY. 8 (A) LOCAL BRIDGES (RESERVED) 9 (B) STATE BRIDGES 10 (1) SR 0042 OVER CATAWISSA CREEK, 11 CATAWISSA BOROUGH, BRIDGE REPLACEMENT 1,240,000 12 (BASE PROJECT ALLOCATION - $1,100,000) 13 (LAND ALLOCATION - $40,000) 14 (DESIGN AND CONTINGENCIES - $100,000) 15 (2) SR 0042 OVER ROARING CREEK, CATAWISSA 16 TOWNSHIP, BRIDGE REPLACEMENT 230,000 17 (BASE PROJECT ALLOCATION - $180,000) 18 (LAND ALLOCATION - $10,000) 19 (DESIGN AND CONTINGENCIES - $40,000) 20 (3) SR 3003 OVER ROARING CREEK, CLEVELAND 21 TOWNSHIP, BRIDGE REPLACEMENT 172,000 22 (BASE PROJECT ALLOCATION - $160,000) 23 (DESIGN AND CONTINGENCIES - $12,000) 24 (4) SR 3008 OVER MUGSER RUN, CLEVELAND 25 TOWNSHIP, BRIDGE REPLACEMENT 145,000 26 (BASE PROJECT ALLOCATION - $100,000) 27 (LAND ALLOCATION - $15,000) 28 (DESIGN AND CONTINGENCIES - $30,000) 29 (5) SR 1020 OVER HUNTINGTON CREEK, FISHING 30 CREEK TOWNSHIP, BRIDGE REHABILITATION 250,000 20080S1503B2376 - 102 -
1 (BASE PROJECT ALLOCATION - $200,000) 2 (LAND ALLOCATION - $10,000) 3 (DESIGN AND CONTINGENCIES - $40,000) 4 (6) SR 1020 OVER PINE CREEK, FISHING CREEK 5 TOWNSHIP, BRIDGE REHABILITATION 196,000 6 (BASE PROJECT ALLOCATION - $180,000) 7 (DESIGN AND CONTINGENCIES - $16,000) 8 (7) SR 1020 OVER FISHING CREEK, FISHING 9 CREEK TOWNSHIP, BRIDGE REHABILITATION 150,000 10 (BASE PROJECT ALLOCATION - $120,000) 11 (LAND ALLOCATION - $10,000) 12 (DESIGN AND CONTINGENCIES - $20,000) 13 (8) SR 0254 OVER TRIBUTARY OF MUD RUN, 14 GREENWOOD TOWNSHIP, BRIDGE REPLACEMENT 160,000 15 (BASE PROJECT ALLOCATION - $130,000) 16 (LAND ALLOCATION - $10,000) 17 (DESIGN AND CONTINGENCIES - $20,000) 18 (9) SR 4004 OVER HEMLOCK CREEK, HEMLOCK 19 TOWNSHIP, BRIDGE REHABILITATION 754,000 20 (BASE PROJECT ALLOCATION - $693,000) 21 (DESIGN AND CONTINGENCIES - $61,000) 22 (10) SR 2014 OVER ROARING CREEK, LOCUST 23 TOWNSHIP, BRIDGE REHABILITATION 323,000 24 (BASE PROJECT ALLOCATION - $261,000) 25 (DESIGN AND CONTINGENCIES - $62,000) 26 (11) SR 0487 OVER TRIBUTARY OF FISHING 27 CREEK, ORANGEVILLE BOROUGH, BRIDGE 28 REPLACEMENT 100,000 29 (BASE PROJECT ALLOCATION - $100,000) 30 SECTION 24. CRAWFORD COUNTY. 20080S1503B2376 - 103 -
1 (A) LOCAL BRIDGES (RESERVED) 2 (B) STATE BRIDGES 3 (1) SR 0008, WILLIAM FLINN OVER SOUTH 4 BRANCH OF HOLLOW RUN, BLOOMFIELD 5 TOWNSHIP, BRIDGE REHABILITATION 48,000 6 (BASE PROJECT ALLOCATION - $48,000) 7 (2) SR 0006 OVER FRENCH CREEK, CAMBRIDGE 8 TOWNSHIP, BRIDGE REHABILITATION 190,000 9 (BASE PROJECT ALLOCATION - $160,000) 10 (LAND ALLOCATION - $10,000) 11 (DESIGN AND CONTINGENCIES - $20,000) 12 (3) SR 1016 OVER TRIBUTARY OF FRENCH 13 CREEK, CAMBRIDGE TOWNSHIP, BRIDGE 14 REHABILITATION 48,000 15 (BASE PROJECT ALLOCATION - $48,000) 16 (4) SR 0008 OVER OIL CREEK, CITY OF 17 TITUSVILLE, BRIDGE REHABILITATION 800,000 18 (BASE PROJECT ALLOCATION - $700,000) 19 (DESIGN AND CONTINGENCIES - $100,000) 20 (5) SR 4001 OVER TRIBUTARY OF PADEN CREEK, 21 CONNEAUT TOWNSHIP, BRIDGE REPLACEMENT 200,000 22 (BASE PROJECT ALLOCATION - $200,000) 23 (6) SR 4010, WEST ROAD OVER CUSSEWAGO 24 CREEK, CUSSEWAGO TOWNSHIP, BRIDGE 25 REHABILITATION 48,000 26 (BASE PROJECT ALLOCATION - $48,000) 27 (7) SR 0098, CUSSEWAGO ROAD OVER TRIBUTARY 28 OF CUSSEWAGO CREEK, CUSSEWAGO TOWNSHIP, 29 BRIDGE REPLACEMENT 138,000 30 (BASE PROJECT ALLOCATION - $138,000) 20080S1503B2376 - 104 -
1 (8) SR 2007, PETTIS ROAD OVER TRIBUTARY OF 2 LITTLE SUGAR CREEK, EAST FAIRFIELD 3 TOWNSHIP, BRIDGE REPLACEMENT 130,000 4 (BASE PROJECT ALLOCATION - $130,000) 5 (9) SR 3019, LAKE ROAD OVER LITTLE SANDY 6 CREEK, GREENWOOD TOWNSHIP, BRIDGE 7 REHABILITATION 40,000 8 (BASE PROJECT ALLOCATION - $40,000) 9 (10) SR 3019, LAKE ROAD OVER ARMOUR RUN, 10 GREENWOOD TOWNSHIP, BRIDGE 11 REHABILITATION 40,000 12 (BASE PROJECT ALLOCATION - $40,000) 13 (11) SR 0408, THOMPSON STREET OVER OIL 14 CREEK, HYDETOWN BOROUGH, BRIDGE 15 REHABILITATION 61,000 16 (BASE PROJECT ALLOCATION - $61,000) 17 (12) SR 0027, PLANK ROAD OVER PINE CREEK, 18 OIL CREEK TOWNSHIP, BRIDGE 19 REHABILITATION 70,000 20 (BASE PROJECT ALLOCATION - $70,000) 21 (13) SR 0408 OVER TRIBUTARY OF MUDDY 22 CREEK, RICHMOND TOWNSHIP, BRIDGE 23 REPLACEMENT 180,000 24 (BASE PROJECT ALLOCATION - $180,000) 25 (14) SR 0077, STATE STREET OVER TRIBUTARY 26 OF WOODCOCK CREEK, RICHMOND TOWNSHIP, 27 BRIDGE REHABILITATION 20,000 28 (BASE PROJECT ALLOCATION - $20,000) 29 (15) SR 1014 OVER MUDDY CREEK, ROCKDALE 30 TOWNSHIP, BRIDGE REHABILITATION 33,000 20080S1503B2376 - 105 -
1 (BASE PROJECT ALLOCATION - $33,000) 2 (16) SR 1035 OVER TRIBUTARY OF MUDDY 3 CREEK, ROCKDALE TOWNSHIP, BRIDGE 4 REHABILITATION 114,000 5 (BASE PROJECT ALLOCATION - $84,000) 6 (LAND ALLOCATION - $10,000) 7 (DESIGN AND CONTINGENCIES - $20,000) 8 (17) SR 0408, CHURCH STREET OVER MOHAWK 9 RUN, ROCKDALE TOWNSHIP, BRIDGE 10 REHABILITATION 17,000 11 (BASE PROJECT ALLOCATION - $17,000) 12 (18) SR 0006 OVER CONNEAUT LAKE OUTLET, 13 SADSBURY TOWNSHIP, BRIDGE REPLACEMENT 800,000 14 (BASE PROJECT ALLOCATION - $700,000) 15 (DESIGN AND CONTINGENCIES - $100,000) 16 (19) SR 0285 OVER ADSIT RUN, SADSBURY 17 TOWNSHIP, BRIDGE REHABILITATION 550,000 18 (BASE PROJECT ALLOCATION - $400,000) 19 (DESIGN AND CONTINGENCIES - $150,000) 20 (20) SR 1001 OVER WOODCOCK CREEK, 21 SAEGERTOWN BOROUGH, BRIDGE 22 REHABILITATION 600,000 23 (BASE PROJECT ALLOCATION - $500,000) 24 (DESIGN AND CONTINGENCIES - $100,000) 25 (21) SR 0018, SPRINGBORO ROAD OVER 26 TRIBUTARY OF CONNEAUT CREEK, SPRING 27 TOWNSHIP, BRIDGE REPLACEMENT 138,000 28 (BASE PROJECT ALLOCATION - $138,000) 29 (22) SR 4010 OVER CARR RUN, SPRING 30 TOWNSHIP, BRIDGE REPLACEMENT 140,000 20080S1503B2376 - 106 -
1 (BASE PROJECT ALLOCATION - $80,000) 2 (LAND ALLOCATION - $10,000) 3 (DESIGN AND CONTINGENCIES - $50,000) 4 (23) SR 0408, CHURCH STREET BRIDGE 5 NO.13126 OVER WET WEATHER STREAM, TROY 6 TOWNSHIP, BRIDGE REPLACEMENT 111,000 7 (BASE PROJECT ALLOCATION - $111,000) 8 (24) SR 2014, SUGAR LAKE OVER BROWN RUN, 9 WAYNE TOWNSHIP, BRIDGE REHABILITATION 17,000 10 (BASE PROJECT ALLOCATION - $17,000) 11 (25) SR 3011, HARTSTOWN ROAD OVER KLINK 12 RUN, WEST FALLOWFIELD TOWNSHIP, BRIDGE 13 REPLACEMENT 130,000 14 (BASE PROJECT ALLOCATION - $130,000) 15 (26) SR 2012, ALDEN STREET OVER MILL RUN, 16 WEST MEAD TOWNSHIP, BRIDGE REPLACEMENT 157,000 17 (BASE PROJECT ALLOCATION - $157,000) 18 SECTION 25. CUMBERLAND COUNTY. 19 (A) LOCAL BRIDGES 20 (1) SOUTH MIDDLETON TOWNSHIP, ZION ROAD 21 OVER YELLOW BREECHES CREEK, BRIDGE 22 REPLACEMENT 2,500,000 23 (BASE PROJECT ALLOCATION - $2,500,000) 24 (2) MIDDLESEX TOWNSHIP, WOLF BRIDGE ROAD 25 OVER CONODOGUINET CREEK, BRIDGE 26 REPLACEMENT 2,800,000 27 (BASE PROJECT ALLOCATION - $2,800,000) 28 (B) STATE BRIDGES 29 (1) SR 2002, EAST NORTH STREET OVER LETORT 30 SPRING RUN, CARLISLE BOROUGH, BRIDGE 20080S1503B2376 - 107 -
1 REHABILITATION 1,460,000 2 (BASE PROJECT ALLOCATION - $650,000) 3 (DESIGN AND CONTINGENCIES - $810,000) 4 (2) SR 3021, BURNTHOUSE ROAD OVER YELLOW 5 BREECHES CREEK, DICKINSON TOWNSHIP, 6 BRIDGE REPLACEMENT 3,320,000 7 (BASE PROJECT ALLOCATION - $1,660,000) 8 (DESIGN AND CONTINGENCIES - $1,660,000) 9 (3) SR 3010, GOODYEAR ROAD OVER HUNTERS 10 RUN, DICKINSON TOWNSHIP, BRIDGE 11 REHABILITATION 500,000 12 (BASE PROJECT ALLOCATION - $500,000) 13 (4) SR 2025, SLATE HILL ROAD OVER SR 0015, 14 LOWER ALLEN TOWNSHIP, BRIDGE 15 REHABILITATION 3,970,000 16 (BASE PROJECT ALLOCATION - $1,850,000) 17 (DESIGN AND CONTINGENCIES - $2,120,000) 18 (5) PA 641 OVER BIG SPRING CREEK, NEWVILLE 19 BOROUGH, BRIDGE REHABILITATION 1,400,000 20 (BASE PROJECT ALLOCATION - $1,400,000) 21 (6) SR 3005 OVER GREEN SPRING CREEK, NORTH 22 NEWTON TOWNSHIP, BRIDGE REPLACEMENT 952,000 23 (BASE PROJECT ALLOCATION - $631,000) 24 (LAND ALLOCATION - $40,000) 25 (DESIGN AND CONTINGENCIES - $281,000) 26 (7) SR 4007 OVER CONODOGUINET CREEK, NORTH 27 NEWTON TOWNSHIP, BRIDGE REHABILITATION 1,207,000 28 (BASE PROJECT ALLOCATION - $1,000,000) 29 (LAND ALLOCATION - $20,000) 30 (DESIGN AND CONTINGENCIES - $187,000) 20080S1503B2376 - 108 -
1 (8) SR 3006 OVER TRIBUTARY OF YELLOW 2 BREECHES CREEK, PENN TOWNSHIP, BRIDGE 3 REPLACEMENT 726,000 4 (BASE PROJECT ALLOCATION - $419,000) 5 (LAND ALLOCATION - $40,000) 6 (DESIGN AND CONTINGENCIES - $267,000) 7 (9) I-81 SOUTHBOUND OVER CONODOGUINET 8 CREEK, SILVER SPRING TOWNSHIP, BRIDGE 9 REHABILITATION 9,000,000 10 (BASE PROJECT ALLOCATION - $9,000,000) 11 (10) I-81 SOUTHBOUND OVER LETORT SPRING 12 RUN, ABANDONED RAILROAD, SOUTH 13 MIDDLETON TOWNSHIP, BRIDGE 14 REHABILITATION 7,500,000 15 (BASE PROJECT ALLOCATION - $7,500,000) 16 (11) SR 2003 OVER YELLOW BREECHES CREEK, 17 SOUTH MIDDLETON TOWNSHIP, BRIDGE 18 REHABILITATION 3,000,000 19 (BASE PROJECT ALLOCATION - $3,000,000) 20 (12) SR 3007, STOUGHSTOWN OVER YELLOW 21 BREECHES CREEK, SOUTH NEWTON TOWNSHIP, 22 BRIDGE REHABILITATION 750,000 23 (BASE PROJECT ALLOCATION - $750,000) 24 (13) SR 1027 OVER TRIBUTARY OF SUSQUEHANNA 25 RIVER, WORMLEYSBURG BOROUGH, BRIDGE 26 REPLACEMENT 138,000 27 (LAND ALLOCATION - $13,000) 28 (DESIGN AND CONTINGENCIES - $125,000) 29 (14) SR 0011, US 11 OVER TRIBUTARY OF 30 SUSQUEHANNA RIVER, WORMLEYSBURG 20080S1503B2376 - 109 -
1 BOROUGH, BRIDGE REPLACEMENT 138,000 2 (LAND ALLOCATION - $13,000) 3 (DESIGN AND CONTINGENCIES - $125,000) 4 SECTION 26. DAUPHIN COUNTY. 5 (A) LOCAL BRIDGES 6 (1) DERRY TOWNSHIP, SR 0743 OVER NORFOLK 7 SOUTHERN RAILROAD, BRIDGE REPLACEMENT 10,673,000 8 (BASE PROJECT ALLOCATION - $8,455,000) 9 (LAND ALLOCATION - $760,000) 10 (DESIGN AND CONTINGENCIES - $300,000) 11 (2) DERRY TOWNSHIP, PARK BOULEVARD OVER 12 SPRING CREEK, BRIDGE REPLACEMENT 1,400,000 13 (BASE PROJECT ALLOCATION - $1,000,000) 14 (LAND ALLOCATION - $100,000) 15 (DESIGN AND CONTINGENCIES - $300,000) 16 (3) DERRY TOWNSHIP, NORFOLK-SOUTHERN 17 RAILROAD BRIDGE OVER RIDGE ROAD, BRIDGE 18 REPLACEMENT 2,600,000 19 (BASE PROJECT ALLOCATION - $2,000,000) 20 (LAND ALLOCATION - $100,000) 21 (DESIGN AND CONTINGENCIES - $500,000) 22 (4) CITY OF HARRISBURG, WALNUT STREET 23 BRIDGE OVER SUSQUEHANNA RIVER, BRIDGE 24 REPLACEMENT 6,600,000 25 (BASE PROJECT ALLOCATION - $5,000,000) 26 (LAND ALLOCATION - $100,000) 27 (DESIGN AND CONTINGENCIES - $1,500,000) 28 (B) STATE BRIDGES 29 (1) SR 0022 OVER MANADA CREEK, EAST 30 HANOVER TOWNSHIP, BRIDGE REPLACEMENT 4,500,000 20080S1503B2376 - 110 -
1 (BASE PROJECT ALLOCATION - $4,500,000) 2 (2) PA 230 OVER CONEWAGO CREEK, 3 LONDONDERRY TOWNSHIP, BRIDGE 4 REHABILITATION 4,335,000 5 (BASE PROJECT ALLOCATION - $2,025,000) 6 (DESIGN AND CONTINGENCIES - $2,310,000) 7 (3) SR 0443, FISHING CREEK ROAD OVER 8 FISHING CREEK, MIDDLE PAXTON TOWNSHIP, 9 BRIDGE REHABILITATION 3,630,000 10 (BASE PROJECT ALLOCATION - $1,680,000) 11 (DESIGN AND CONTINGENCIES - $1,950,000) 12 (4) SR 0025, PA 25 OVER TRIBUTARY OF 13 WICONISCO CREEK, MIFFLIN TOWNSHIP, 14 BRIDGE REPLACEMENT 699,000 15 (BASE PROJECT ALLOCATION - $479,000) 16 (LAND ALLOCATION - $40,000) 17 (DESIGN AND CONTINGENCIES - $180,000) 18 (5) SR 2010, EAST CANAL STREET OVER MANADA 19 CREEK, SOUTH HANOVER TOWNSHIP, BRIDGE 20 REHABILITATION 2,895,000 21 (BASE PROJECT ALLOCATION - $1,305,000) 22 (DESIGN AND CONTINGENCIES - $1,590,000) 23 (6) SR 2003 OVER SWATARA CREEK, SOUTH 24 HANOVER TOWNSHIP, BRIDGE 25 REHABILITATION 1,057,000 26 (BASE PROJECT ALLOCATION - $800,000) 27 (LAND ALLOCATION - $30,000) 28 (DESIGN AND CONTINGENCIES - $227,000) 29 (7) SR 3006, CHAMBERS HILL ROAD OVER SR 30 0283 AND SR 3001, SWATARA TOWNSHIP, 20080S1503B2376 - 111 -
1 BRIDGE REHABILITATION 2,850,000 2 (BASE PROJECT ALLOCATION - $2,570,000) 3 (LAND ALLOCATION - $30,000) 4 (DESIGN AND CONTINGENCIES - $250,000) 5 (8) PA 147 OVER WICONISCO CREEK, UPPER 6 PAXTON TOWNSHIP, BRIDGE REHABILITATION 3,630,000 7 (BASE PROJECT ALLOCATION - $1,680,000) 8 (DESIGN AND CONTINGENCIES - $1,950,000) 9 (9) SR 4009, WICONISCO STREET OVER LITTLE 10 WICONISCO CREEK, UPPER PAXTON TOWNSHIP, 11 BRIDGE REHABILITATION 1,090,000 12 (BASE PROJECT ALLOCATION - $490,000) 13 (DESIGN AND CONTINGENCIES - $600,000) 14 (10) SR 4009, WICONISCO STREET OVER 15 WICONISCO CREEK, UPPER PAXTON TOWNSHIP, 16 BRIDGE REHABILITATION 1,090,000 17 (BASE PROJECT ALLOCATION - $490,000) 18 (DESIGN AND CONTINGENCIES - $600,000) 19 (11) SR 1006, RAKERS MILL ROAD OVER 20 WICONISCO CREEK, WASHINGTON TOWNSHIP, 21 BRIDGE REHABILITATION 3,135,000 22 (BASE PROJECT ALLOCATION - $1,425,000) 23 (DESIGN AND CONTINGENCIES - $1,710,000) 24 (12) SR 0443, PA 443 OVER TRIBUTARY OF 25 FISHING CREEK, WEST HANOVER TOWNSHIP, 26 BRIDGE REPLACEMENT 100,000 27 (BASE PROJECT ALLOCATION - $100,000) 28 SECTION 27. DELAWARE COUNTY. 29 (A) LOCAL BRIDGES 30 (1) NEWTOWN TOWNSHIP, T-640, SR 7208 OVER 20080S1503B2376 - 112 -
1 HUNTER CREEK, BRIDGE REPLACEMENT 560,000 2 (BASE PROJECT ALLOCATION - $560,000) 3 (B) STATE BRIDGES 4 (1) SR 3007, CONCORD ROAD OVER BALDWIN 5 RUN, CHESTER TOWNSHIP, BRIDGE 6 REHABILITATION 63,000 7 (BASE PROJECT ALLOCATION - $11,000) 8 (LAND ALLOCATION - $1,000) 9 (DESIGN AND CONTINGENCIES - $51,000) 10 (2) SR 2006, MACDADE BOULEVARD OVER RIDLEY 11 CREEK, CHESTER TOWNSHIP, BRIDGE 12 REHABILITATION 63,000 13 (BASE PROJECT ALLOCATION - $11,000) 14 (LAND ALLOCATION - $1,000) 15 (DESIGN AND CONTINGENCIES - $51,000) 16 (3) SR 3046 OVER WEBB CREEK, CONCORD 17 TOWNSHIP, BRIDGE REPLACEMENT 2,500,000 18 (BASE PROJECT ALLOCATION - $691,000) 19 (LAND ALLOCATION - $60,000) 20 (DESIGN AND CONTINGENCIES - $1,749,000) 21 (4) SR 2006, MACDADE BOULEVARD OVER 22 MUNCKINIPATTUS CREEK, GLENOLDEN 23 BOROUGH, BRIDGE REHABILITATION 1,389,000 24 (BASE PROJECT ALLOCATION - $96,000) 25 (LAND ALLOCATION - $31,000) 26 (DESIGN AND CONTINGENCIES - $1,262,000) 27 (5) SR 1018, ARDMORE AVENUE OVER COBBS 28 CREEK, HAVERFORD TOWNSHIP, BRIDGE 29 REHABILITATION 63,000 30 (BASE PROJECT ALLOCATION - $11,000) 20080S1503B2376 - 113 -
1 (LAND ALLOCATION - $1,000) 2 (DESIGN AND CONTINGENCIES - $51,000) 3 (6) SR 1026, COLLEGE AVENUE OVER COBBS 4 CREEK, HAVERFORD TOWNSHIP, BRIDGE 5 REPLACEMENT 3,353,000 6 (BASE PROJECT ALLOCATION - $2,184,000) 7 (LAND ALLOCATION - $600,000) 8 (DESIGN AND CONTINGENCIES - $569,000) 9 (7) SR 1026, COLLEGE AVENUE OVER SEPTA 10 P&W, HAVERFORD TOWNSHIP, BRIDGE 11 REHABILITATION 4,500,000 12 (BASE PROJECT ALLOCATION - $1,150,000) 13 (LAND ALLOCATION - $200,000) 14 (DESIGN AND CONTINGENCIES - $3,150,000) 15 (8) SR 0003, WEST CHESTER PIKE OVER MID- 16 COUNTY EXPRESSWAY, RAMP, MARPLE 17 TOWNSHIP, BRIDGE REHABILITATION 63,000 18 (BASE PROJECT ALLOCATION - $11,000) 19 (LAND ALLOCATION - $1,000) 20 (DESIGN AND CONTINGENCIES - $51,000) 21 (9) SR 3015, CREEK ROAD OVER BRANCH OF 22 CHESTER CREEK, MIDDLETOWN TOWNSHIP, 23 BRIDGE REHABILITATION 63,000 24 (BASE PROJECT ALLOCATION - $11,000) 25 (LAND ALLOCATION - $1,000) 26 (DESIGN AND CONTINGENCIES - $51,000) 27 (10) SR 3019, MANCHESTER AVENUE OVER 28 SEPTA, NETHER PROVIDENCE TOWNSHIP, 29 BRIDGE REHABILITATION 63,000 30 (BASE PROJECT ALLOCATION - $11,000) 20080S1503B2376 - 114 -
1 (LAND ALLOCATION - $1,000) 2 (DESIGN AND CONTINGENCIES - $51,000) 3 (11) SR 1015, DARBY PAOLI ROAD OVER LITTLE 4 DARBY CREEK, RADNOR TOWNSHIP, BRIDGE 5 REHABILITATION 63,000 6 (BASE PROJECT ALLOCATION - $11,000) 7 (LAND ALLOCATION - $1,000) 8 (DESIGN AND CONTINGENCIES - $51,000) 9 (12) SR 1034, GOSHEN ROAD OVER DARBY 10 CREEK, RADNOR TOWNSHIP, BRIDGE 11 REHABILITATION 63,000 12 (BASE PROJECT ALLOCATION - $11,000) 13 (LAND ALLOCATION - $1,000) 14 (DESIGN AND CONTINGENCIES - $51,000) 15 (13) SR 0322, CONCHESTER HIGHWAY OVER CSX 16 RAILROAD, UPPER CHICHESTER TOWNSHIP, 17 BRIDGE REHABILITATION 63,000 18 (BASE PROJECT ALLOCATION - $11,000) 19 (LAND ALLOCATION - $1,000) 20 (DESIGN AND CONTINGENCIES - $51,000) 21 (14) SR 2019, BISHOP AVENUE OVER DARBY 22 CREEK, UPPER DARBY TOWNSHIP, BRIDGE 23 REHABILITATION 63,000 24 (BASE PROJECT ALLOCATION - $11,000) 25 (LAND ALLOCATION - $1,000) 26 (DESIGN AND CONTINGENCIES - $51,000) 27 (15) SR 2026, STATE ROAD OVER COBBS CREEK, 28 UPPER DARBY TOWNSHIP, BRIDGE 29 REHABILITATION 1,389,000 30 (BASE PROJECT ALLOCATION - $96,000) 20080S1503B2376 - 115 -
1 (LAND ALLOCATION - $31,000) 2 (DESIGN AND CONTINGENCIES - $1,262,000) 3 SECTION 28. ELK COUNTY. 4 (A) LOCAL BRIDGES 5 (1) JONES TOWNSHIP, T-368 OVER WEST BRANCH 6 OF CLARION RIVER, BRIDGE REPLACEMENT 755,000 7 (BASE PROJECT ALLOCATION - $500,000) 8 (LAND ALLOCATION - $5,000) 9 (DESIGN AND CONTINGENCIES - $250,000) 10 (2) BENEZETTE TOWNSHIP, T-426 OVER 11 BENEZETTE BRANCH OF SINNEMAHONING 12 CREEK, BRIDGE REPLACEMENT 5,000,000 13 (BASE PROJECT ALLOCATION - $5,000,000) 14 (3) JAY TOWNSHIP, T-464 OVER BENNET BRANCH 15 OF SINNEMAHONING CREEK, BRIDGE 16 REPLACEMENT 2,300,000 17 (BASE PROJECT ALLOCATION - $2,300,000) 18 (4) JAY TOWNSHIP, T-410 OVER BENNET BRANCH 19 OF SINNEMAHONING CREEK, BRIDGE 20 REHABILITATION 125,000 21 (BASE PROJECT ALLOCATION - $125,000) 22 (5) MILLSTONE TOWNSHIP, T-301 OVER CLINE 23 RUN, BRIDGE REHABILITATION 20,000 24 (BASE PROJECT ALLOCATION - $20,000) 25 (6) SPRING CREEK TOWNSHIP, T-314 OVER 26 UNNAMED TRIBUTARY OF CLARION RIVER, 27 BRIDGE REHABILITATION 50,000 28 (BASE PROJECT ALLOCATION - $50,000) 29 (B) STATE BRIDGES 30 (1) SR 1008 OVER WEST CREEK, CITY OF ST. 20080S1503B2376 - 116 -
1 MARYS, BRIDGE REHABILITATION 1,400,000 2 (BASE PROJECT ALLOCATION - $1,000,000) 3 (LAND ALLOCATION - $200,000) 4 (DESIGN AND CONTINGENCIES - $200,000) 5 (2) SR 2007 OVER MILL CREEK, FOX TOWNSHIP, 6 BRIDGE REPLACEMENT 215,000 7 (BASE PROJECT ALLOCATION - $140,000) 8 (DESIGN AND CONTINGENCIES - $75,000) 9 (3) SR 0219 OVER MEAD RUN, HORTON 10 TOWNSHIP, BRIDGE REPLACEMENT 1,500,000 11 (BASE PROJECT ALLOCATION - $1,100,000) 12 (LAND ALLOCATION - $150,000) 13 (DESIGN AND CONTINGENCIES - $250,000) 14 (4) SR 3003 OVER MEAD RUN, HORTON 15 TOWNSHIP, BRIDGE REPLACEMENT 300,000 16 (BASE PROJECT ALLOCATION - $200,000) 17 (LAND ALLOCATION - $50,000) 18 (DESIGN AND CONTINGENCIES - $50,000) 19 (5) SR 1001 OVER CROOKED CREEK, JONES 20 TOWNSHIP, BRIDGE REHABILITATION 850,000 21 (BASE PROJECT ALLOCATION - $450,000) 22 (LAND ALLOCATION - $100,000) 23 (DESIGN AND CONTINGENCIES - $300,000) 24 (6) SR 4003 OVER BEAR CREEK, JONES 25 TOWNSHIP, BRIDGE REPLACEMENT 226,000 26 (BASE PROJECT ALLOCATION - $140,000) 27 (LAND ALLOCATION - $6,000) 28 (DESIGN AND CONTINGENCIES - $80,000) 29 (7) SR 3002 OVER MILLSTONE CREEK, 30 MILLSTONE TOWNSHIP, BRIDGE REPLACEMENT 1,400,000 20080S1503B2376 - 117 -
1 (BASE PROJECT ALLOCATION - $1,000,000) 2 (LAND ALLOCATION - $200,000) 3 (DESIGN AND CONTINGENCIES - $200,000) 4 (8) SR 3005 OVER WYNCOOP RUN, MILLSTONE 5 TOWNSHIP, BRIDGE REPLACEMENT 296,000 6 (BASE PROJECT ALLOCATION - $196,000) 7 (LAND ALLOCATION - $30,000) 8 (DESIGN AND CONTINGENCIES - $70,000) 9 (9) SR 0219 OVER ELK CREEK, RIDGWAY 10 BOROUGH, BRIDGE REPLACEMENT 1,400,000 11 (BASE PROJECT ALLOCATION - $1,000,000) 12 (LAND ALLOCATION - $200,000) 13 (DESIGN AND CONTINGENCIES - $200,000) 14 (10) SR 0120 OVER ELK CREEK, RIDGWAY 15 TOWNSHIP, BRIDGE REHABILITATION 4,380,000 16 (BASE PROJECT ALLOCATION - $4,200,000) 17 (LAND ALLOCATION - $40,000) 18 (DESIGN AND CONTINGENCIES - $140,000) 19 (11) SR 3002 OVER BIG MILL CREEK, RIDGWAY 20 TOWNSHIP, BRIDGE REPLACEMENT 300,000 21 (BASE PROJECT ALLOCATION - $200,000) 22 (LAND ALLOCATION - $40,000) 23 (DESIGN AND CONTINGENCIES - $60,000) 24 SECTION 29. ERIE COUNTY. 25 (A) LOCAL BRIDGES 26 (1) AMITY TOWNSHIP, T-559 OVER BRANCH OF 27 FRENCH CREEK, BRIDGE REPLACEMENT 925,000 28 (BASE PROJECT ALLOCATION - $750,000) 29 (LAND ALLOCATION - $25,000) 30 (DESIGN AND CONTINGENCIES - $150,000) 20080S1503B2376 - 118 -
1 (2) ELK CREEK TOWNSHIP, T-313 OVER 2 CUSSEWAGO CREEK, BRIDGE REPLACEMENT 925,000 3 (BASE PROJECT ALLOCATION - $750,000) 4 (LAND ALLOCATION - $25,000) 5 (DESIGN AND CONTINGENCIES - $150,000) 6 (3) FAIRVIEW TOWNSHIP, T-515 OVER GOODBAN 7 RUN, BRIDGE REPLACEMENT 925,000 8 (BASE PROJECT ALLOCATION - $750,000) 9 (LAND ALLOCATION - $25,000) 10 (DESIGN AND CONTINGENCIES - $150,000) 11 (4) FRANKLIN TOWNSHIP, T-434 OVER FALLS 12 RUN, BRIDGE REPLACEMENT 675,000 13 (BASE PROJECT ALLOCATION - $500,000) 14 (LAND ALLOCATION - $25,000) 15 (DESIGN AND CONTINGENCIES - $150,000) 16 (5) GIRARD TOWNSHIP, T-479 OVER LITTLE ELK 17 CREEK, BRIDGE REPLACEMENT 1,175,000 18 (BASE PROJECT ALLOCATION - $1,000,000) 19 (LAND ALLOCATION - $25,000) 20 (DESIGN AND CONTINGENCIES - $150,000) 21 (6) GIRARD TOWNSHIP, T-390 OVER HALLS RUN, 22 BRIDGE REPLACEMENT 925,000 23 (BASE PROJECT ALLOCATION - $750,000) 24 (LAND ALLOCATION - $25,000) 25 (DESIGN AND CONTINGENCIES - $150,000) 26 (7) GREENE TOWNSHIP, T-305 OVER LEBOEUF 27 CREEK, BRIDGE REPLACEMENT 925,000 28 (BASE PROJECT ALLOCATION - $750,000) 29 (LAND ALLOCATION - $25,000) 30 (DESIGN AND CONTINGENCIES - $150,000) 20080S1503B2376 - 119 -
1 (8) HARBORCREEK TOWNSHIP, T-717 OVER 2 FOURMILE CREEK, BRIDGE REPLACEMENT 1,175,000 3 (BASE PROJECT ALLOCATION - $1,000,000) 4 (LAND ALLOCATION - $25,000) 5 (DESIGN AND CONTINGENCIES - $150,000) 6 (9) HARBORCREEK TOWNSHIP, T-666 OVER 7 SEVENMILE CREEK, BRIDGE REPLACEMENT 675,000 8 (BASE PROJECT ALLOCATION - $500,000) 9 (LAND ALLOCATION - $25,000) 10 (DESIGN AND CONTINGENCIES - $150,000) 11 (10) HARBORCREEK TOWNSHIP, T-303 OVER 12 SEVENMILE CREEK, BRIDGE REPLACEMENT 675,000 13 (BASE PROJECT ALLOCATION - $500,000) 14 (LAND ALLOCATION - $25,000) 15 (DESIGN AND CONTINGENCIES - $150,000) 16 (11) HARBORCREEK TOWNSHIP, T-650 OVER 17 EIGHTMILE CREEK, BRIDGE REPLACEMENT 675,000 18 (BASE PROJECT ALLOCATION - $500,000) 19 (LAND ALLOCATION - $25,000) 20 (DESIGN AND CONTINGENCIES - $150,000) 21 (12) MCKEAN TOWNSHIP, T-480 OVER LAMSON 22 RUN, BRIDGE REPLACEMENT 700,000 23 (BASE PROJECT ALLOCATION - $350,000) 24 (LAND ALLOCATION - $50,000) 25 (DESIGN AND CONTINGENCIES - $300,000) 26 (13) MCKEAN TOWNSHIP, T-480 OVER LAMSON 27 RUN, BRIDGE REPLACEMENT 700,000 28 (BASE PROJECT ALLOCATION - $350,000) 29 (LAND ALLOCATION - $50,000) 30 (DESIGN AND CONTINGENCIES - $300,000) 20080S1503B2376 - 120 -
1 (14) MCKEAN TOWNSHIP, T-480 OVER LAMSON 2 RUN, BRIDGE REPLACEMENT 850,000 3 (BASE PROJECT ALLOCATION - $500,000) 4 (LAND ALLOCATION - $50,000) 5 (DESIGN AND CONTINGENCIES - $300,000) 6 (15) MCKEAN TOWNSHIP, T-481 OVER LAMSON 7 RUN, BRIDGE REPLACEMENT 700,000 8 (BASE PROJECT ALLOCATION - $350,000) 9 (LAND ALLOCATION - $50,000) 10 (DESIGN AND CONTINGENCIES - $300,000) 11 (16) MCKEAN TOWNSHIP, T-575 OVER TRIBUTARY 12 OF WALNUT CREEK, BRIDGE REPLACEMENT 700,000 13 (BASE PROJECT ALLOCATION - $350,000) 14 (LAND ALLOCATION - $50,000) 15 (DESIGN AND CONTINGENCIES - $300,000) 16 (17) MCKEAN TOWNSHIP, T-609 OVER TRIBUTARY 17 OF WALNUT CREEK, BRIDGE REPLACEMENT 700,000 18 (BASE PROJECT ALLOCATION - $350,000) 19 (LAND ALLOCATION - $50,000) 20 (DESIGN AND CONTINGENCIES - $300,000) 21 (18) MCKEAN TOWNSHIP, T-549 OVER DRY RUN, 22 BRIDGE REPLACEMENT 700,000 23 (BASE PROJECT ALLOCATION - $350,000) 24 (LAND ALLOCATION - $50,000) 25 (DESIGN AND CONTINGENCIES - $300,000) 26 (19) MCKEAN TOWNSHIP, T-512 OVER ELK 27 CREEK, BRIDGE REPLACEMENT 1,050,000 28 (BASE PROJECT ALLOCATION - $700,000) 29 (LAND ALLOCATION - $50,000) 30 (DESIGN AND CONTINGENCIES - $300,000) 20080S1503B2376 - 121 -
1 (20) MCKEAN TOWNSHIP, T-512 OVER TRIBUTARY 2 OF ELK CREEK, BRIDGE REPLACEMENT 700,000 3 (BASE PROJECT ALLOCATION - $350,000) 4 (LAND ALLOCATION - $50,000) 5 (DESIGN AND CONTINGENCIES - $300,000) 6 (21) MCKEAN TOWNSHIP, T-490 OVER TRIBUTARY 7 OF ELK CREEK, BRIDGE REPLACEMENT 700,000 8 (BASE PROJECT ALLOCATION - $350,000) 9 (LAND ALLOCATION - $50,000) 10 (DESIGN AND CONTINGENCIES - $300,000) 11 (22) MILLCREEK TOWNSHIP, T-340 OVER WALNUT 12 CREEK, BRIDGE REPLACEMENT 925,000 13 (BASE PROJECT ALLOCATION - $750,000) 14 (LAND ALLOCATION - $25,000) 15 (DESIGN AND CONTINGENCIES - $150,000) 16 (23) MILLCREEK TOWNSHIP, CIDERMILL ROAD 17 OVER MILL CREEK, BRIDGE REPLACEMENT 925,000 18 (BASE PROJECT ALLOCATION - $750,000) 19 (LAND ALLOCATION - $25,000) 20 (DESIGN AND CONTINGENCIES - $150,000) 21 (24) MILLCREEK TOWNSHIP, T-665 OVER MILL 22 CREEK, BRIDGE REPLACEMENT 925,000 23 (BASE PROJECT ALLOCATION - $750,000) 24 (LAND ALLOCATION - $25,000) 25 (DESIGN AND CONTINGENCIES - $150,000) 26 (25) MILLCREEK TOWNSHIP, T-442 OVER WALNUT 27 CREEK, BRIDGE REPLACEMENT 1,175,000 28 (BASE PROJECT ALLOCATION - $1,000,000) 29 (LAND ALLOCATION - $25,000) 30 (DESIGN AND CONTINGENCIES - $150,000) 20080S1503B2376 - 122 -
1 (26) NORTH EAST TOWNSHIP, T-301 OVER 2 PURDUE CREEK, BRIDGE REPLACEMENT 925,000 3 (BASE PROJECT ALLOCATION - $750,000) 4 (LAND ALLOCATION - $25,000) 5 (DESIGN AND CONTINGENCIES - $150,000) 6 (27) SPRINGFIELD TOWNSHIP, T-348 OVER 7 CROOKED CREEK, BRIDGE REPLACEMENT 925,000 8 (BASE PROJECT ALLOCATION - $750,000) 9 (LAND ALLOCATION - $25,000) 10 (DESIGN AND CONTINGENCIES - $150,000) 11 (28) SUMMIT TOWNSHIP, T-558 OVER WALNUT 12 CREEK, BRIDGE REPLACEMENT 675,000 13 (BASE PROJECT ALLOCATION - $500,000) 14 (LAND ALLOCATION - $25,000) 15 (DESIGN AND CONTINGENCIES - $150,000) 16 (29) SUMMIT TOWNSHIP, T-534 OVER ELK 17 CREEK, BRIDGE REPLACEMENT 675,000 18 (BASE PROJECT ALLOCATION - $500,000) 19 (LAND ALLOCATION - $25,000) 20 (DESIGN AND CONTINGENCIES - $150,000) 21 (30) WATERFORD TOWNSHIP, T-300 OVER TROUT 22 RUN, BRIDGE REPLACEMENT 925,000 23 (BASE PROJECT ALLOCATION - $750,000) 24 (LAND ALLOCATION - $25,000) 25 (DESIGN AND CONTINGENCIES - $150,000) 26 (31) MILL VILLAGE BOROUGH, DEPOT STREET 27 OVER BRANCH OF FRENCH CREEK, BRIDGE 28 REPLACEMENT 675,000 29 (BASE PROJECT ALLOCATION - $500,000) 30 (LAND ALLOCATION - $25,000) 20080S1503B2376 - 123 -
1 (DESIGN AND CONTINGENCIES - $150,000) 2 (32) HARBORCREEK TOWNSHIP, SAWMILL ROAD 3 OVER TWELVE MILE CREEK, BRIDGE 4 REPLACEMENT 675,000 5 (BASE PROJECT ALLOCATION - $500,000) 6 (LAND ALLOCATION - $25,000) 7 (DESIGN AND CONTINGENCIES - $150,000) 8 (33) MCKEAN TOWNSHIP, T-480, OLD 99 OVER 9 TRIBUTARY OF LAMSON RUN, BRIDGE 10 REPLACEMENT 700,000 11 (BASE PROJECT ALLOCATION - $350,000) 12 (LAND ALLOCATION - $50,000) 13 (DESIGN AND CONTINGENCIES - $300,000) 14 (34) MCKEAN TOWNSHIP, T-480, OLD 99 OVER 15 LAMSON RUN, BRIDGE REPLACEMENT 700,000 16 (BASE PROJECT ALLOCATION - $350,000) 17 (LAND ALLOCATION - $50,000) 18 (DESIGN AND CONTINGENCIES - $300,000) 19 (35) MCKEAN TOWNSHIP, T-480, OLD 99 OVER 20 LAMSON RUN, BRIDGE REPLACEMENT 850,000 21 (BASE PROJECT ALLOCATION - $500,000) 22 (LAND ALLOCATION - $50,000) 23 (DESIGN AND CONTINGENCIES - $300,000) 24 (36) MCKEAN TOWNSHIP, T-481, WEST 25 STANCLIFF ROAD OVER LAMSON RUN, BRIDGE 26 REPLACEMENT 700,000 27 (BASE PROJECT ALLOCATION - $350,000) 28 (LAND ALLOCATION - $50,000) 29 (DESIGN AND CONTINGENCIES - $300,000) 30 (37) MCKEAN TOWNSHIP, T-575, PINETREE ROAD 20080S1503B2376 - 124 -
1 OVER TRIBUTARY OF WALNUT CREEK, BRIDGE 2 REPLACEMENT 700,000 3 (BASE PROJECT ALLOCATION - $350,000) 4 (LAND ALLOCATION - $50,000) 5 (DESIGN AND CONTINGENCIES - $300,000) 6 (38) MCKEAN TOWNSHIP, T-609, CALIFORNIA 7 ROAD OVER TRIBUTARY OF WALNUT CREEK, 8 BRIDGE REPLACEMENT 700,000 9 (BASE PROJECT ALLOCATION - $350,000) 10 (LAND ALLOCATION - $50,000) 11 (DESIGN AND CONTINGENCIES - $300,000) 12 (39) MCKEAN TOWNSHIP, T-549, GREENLEE ROAD 13 OVER DRY RUN, BRIDGE REPLACEMENT 700,000 14 (BASE PROJECT ALLOCATION - $350,000) 15 (LAND ALLOCATION - $50,000) 16 (DESIGN AND CONTINGENCIES - $300,000) 17 (40) MCKEAN TOWNSHIP, T-512, OLIVER ROAD 18 OVER ELK CREEK, BRIDGE REPLACEMENT 1,050,000 19 (BASE PROJECT ALLOCATION - $700,000) 20 (LAND ALLOCATION - $50,000) 21 (DESIGN AND CONTINGENCIES - $300,000) 22 (41) MCKEAN TOWNSHIP, T-512, OLIVER ROAD 23 OVER TRIBUTARY OF ELK CREEK, BRIDGE 24 REPLACEMENT 700,000 25 (BASE PROJECT ALLOCATION - $350,000) 26 (LAND ALLOCATION - $50,000) 27 (DESIGN AND CONTINGENCIES - $300,000) 28 (42) MCKEAN TOWNSHIP, T-490, DUNN VALLEY 29 ROAD OVER TRIBUTARY OF ELK CREEK, 30 BRIDGE REPLACEMENT 700,000 20080S1503B2376 - 125 -
1 (BASE PROJECT ALLOCATION - $350,000) 2 (LAND ALLOCATION - $50,000) 3 (DESIGN AND CONTINGENCIES - $300,000) 4 (B) STATE BRIDGES 5 (1) SR 0008, WATERFORD ROAD OVER ALDER 6 RUN, AMITY TOWNSHIP, BRIDGE 7 REHABILITATION 45,000 8 (BASE PROJECT ALLOCATION - $45,000) 9 (2) SR 3001 OVER CONNEAUT CREEK, CONNEAUT 10 TOWNSHIP, BRIDGE REHABILITATION 750,000 11 (BASE PROJECT ALLOCATION - $600,000) 12 (DESIGN AND CONTINGENCIES - $150,000) 13 (3) SR 3006, US 6N OVER BRANCH OF CONNEAUT 14 CREEK, CONNEAUT TOWNSHIP, BRIDGE 15 REHABILITATION 40,000 16 (BASE PROJECT ALLOCATION - $40,000) 17 (4) SR 0098 OVER CUSSEWAGO CREEK, ELK 18 CREEK TOWNSHIP, BRIDGE REHABILITATION 13,000 19 (BASE PROJECT ALLOCATION - $13,000) 20 (5) SR 0005 OVER WALNUT CREEK, FAIRVIEW 21 TOWNSHIP, BRIDGE REHABILITATION 1,400,000 22 (BASE PROJECT ALLOCATION - $1,000,000) 23 (DESIGN AND CONTINGENCIES - $400,000) 24 (6) SR 0020, RIDGE ROAD OVER WALNUT CREEK, 25 FAIRVIEW TOWNSHIP, BRIDGE 26 REHABILITATION 13,000 27 (BASE PROJECT ALLOCATION - $13,000) 28 (7) SR 3014 OVER LITTLE ELK CREEK, GIRARD 29 TOWNSHIP, BRIDGE REHABILITATION 120,000 30 (BASE PROJECT ALLOCATION - $60,000) 20080S1503B2376 - 126 -
1 (LAND ALLOCATION - $40,000) 2 (DESIGN AND CONTINGENCIES - $20,000) 3 (8) SR 3105 OVER SR 0090, GIRARD TOWNSHIP, 4 BRIDGE REHABILITATION 650,000 5 (BASE PROJECT ALLOCATION - $500,000) 6 (DESIGN AND CONTINGENCIES - $150,000) 7 (9) SR 0005 OVER TWELVE MILE CREEK, 8 HARBORCREEK TOWNSHIP, BRIDGE 9 REHABILITATION 800,000 10 (BASE PROJECT ALLOCATION - $500,000) 11 (DESIGN AND CONTINGENCIES - $300,000) 12 (10) SR 0955 OVER SIX MILE CREEK, 13 HARBORCREEK TOWNSHIP, BRIDGE 14 REPLACEMENT 2,200,000 15 (BASE PROJECT ALLOCATION - $1,800,000) 16 (DESIGN AND CONTINGENCIES - $400,000) 17 (11) SR 0955 OVER TRIBUTARY OF SEVEN MILE 18 CREEK, HARBORCREEK TOWNSHIP, BRIDGE 19 REPLACEMENT 721,000 20 (BASE PROJECT ALLOCATION - $495,000) 21 (LAND ALLOCATION - $43,000) 22 (DESIGN AND CONTINGENCIES - $183,000) 23 (12) SR 4011 OVER SR 0090, MCKEAN 24 TOWNSHIP, BRIDGE REHABILITATION 750,000 25 (BASE PROJECT ALLOCATION - $600,000) 26 (DESIGN AND CONTINGENCIES - $150,000) 27 (13) SR 4011 OVER SR 0079, MCKEAN 28 TOWNSHIP, BRIDGE REHABILITATION 850,000 29 (BASE PROJECT ALLOCATION - $700,000) 30 (DESIGN AND CONTINGENCIES - $150,000) 20080S1503B2376 - 127 -
1 (14) SR 0005 OVER TURKEY CREEK BRANCH, 2 SPRINGFIELD TOWNSHIP, BRIDGE 3 REPLACEMENT 695,000 4 (BASE PROJECT ALLOCATION - $470,000) 5 (LAND ALLOCATION - $42,000) 6 (DESIGN AND CONTINGENCIES - $183,000) 7 (15) SR 3101 OVER SR 0090, SPRINGFIELD 8 TOWNSHIP, BRIDGE REHABILITATION 1,350,000 9 (BASE PROJECT ALLOCATION - $1,200,000) 10 (DESIGN AND CONTINGENCIES - $150,000) 11 (16) SR 3102 OVER SR 0090, SPRINGFIELD 12 TOWNSHIP, BRIDGE REHABILITATION 1,450,000 13 (BASE PROJECT ALLOCATION - $1,300,000) 14 (DESIGN AND CONTINGENCIES - $150,000) 15 (17) SR 3103 OVER SR 0090, SPRINGFIELD 16 TOWNSHIP, BRIDGE REHABILITATION 2,425,000 17 (BASE PROJECT ALLOCATION - $2,200,000) 18 (DESIGN AND CONTINGENCIES - $225,000) 19 (18) SR 3104 OVER SR 0090, SPRINGFIELD 20 TOWNSHIP, BRIDGE REHABILITATION 1,625,000 21 (BASE PROJECT ALLOCATION - $1,400,000) 22 (DESIGN AND CONTINGENCIES - $225,000) 23 (19) SR 4024, ROBINSON ROAD OVER BRANCH OF 24 WALNUT CREEK, SUMMIT TOWNSHIP, BRIDGE 25 REHABILITATION 30,000 26 (BASE PROJECT ALLOCATION - $30,000) 27 (20) SR 0079 NORTHBOUND OVER TRIBUTARY OF 28 WALNUT CREEK, SUMMIT TOWNSHIP, BRIDGE 29 REHABILITATION 13,000 30 (BASE PROJECT ALLOCATION - $13,000) 20080S1503B2376 - 128 -
1 (21) SR 3006, US 6N OVER BORO RUN, 2 WASHINGTON TOWNSHIP, BRIDGE 3 REHABILITATION 30,000 4 (BASE PROJECT ALLOCATION - $30,000) 5 (22) SR 3025 OVER CUMMINGS CREEK, 6 WASHINGTON TOWNSHIP, BRIDGE 7 REPLACEMENT 200,000 8 (BASE PROJECT ALLOCATION - $200,000) 9 (23) SR 3025 OVER CONNEAUTTEE CREEK, 10 WASHINGTON TOWNSHIP, BRIDGE 11 REPLACEMENT 200,000 12 (BASE PROJECT ALLOCATION - $200,000) 13 (24) SR 2006, DONATION ROAD OVER LEBOEUF 14 CREEK, WATERFORD TOWNSHIP, BRIDGE 15 REHABILITATION 70,000 16 (BASE PROJECT ALLOCATION - $70,000) 17 SECTION 30. FAYETTE COUNTY. 18 (A) LOCAL BRIDGES 19 (1) BROWNSVILLE TOWNSHIP, TR 440, CENTURY 20 BRIDGE OVER TRIBUTARY OF MONONGAHELA 21 RIVER, BRIDGE REHABILITATION 100,000 22 (BASE PROJECT ALLOCATION - $100,000) 23 (B) STATE BRIDGES 24 (1) SR 1029 OVER SR 0119, BULLSKIN 25 TOWNSHIP, BRIDGE REPLACEMENT 750,000 26 (BASE PROJECT ALLOCATION - $600,000) 27 (LAND ALLOCATION - $30,000) 28 (DESIGN AND CONTINGENCIES - $120,000) 29 (2) SR 8017 OVER IRISH RUN, BULLSKIN 30 TOWNSHIP, BRIDGE REPLACEMENT 1,425,000 20080S1503B2376 - 129 -
1 (BASE PROJECT ALLOCATION - $1,030,000) 2 (LAND ALLOCATION - $40,000) 3 (DESIGN AND CONTINGENCIES - $355,000) 4 (3) SR 1039 OVER BRANCH OF DICKERSON RUN, 5 DUNBAR TOWNSHIP, BRIDGE REPLACEMENT 262,000 6 (BASE PROJECT ALLOCATION - $188,000) 7 (LAND ALLOCATION - $8,000) 8 (DESIGN AND CONTINGENCIES - $66,000) 9 (4) SR 1051 OVER BRANCH OF OPOSSUM RUN, 10 DUNBAR TOWNSHIP, BRIDGE REPLACEMENT 920,000 11 (BASE PROJECT ALLOCATION - $650,000) 12 (LAND ALLOCATION - $40,000) 13 (DESIGN AND CONTINGENCIES - $230,000) 14 (5) SR 4032 OVER BOLDEN RUN, FRANKLIN 15 TOWNSHIP, BRIDGE REPLACEMENT 206,000 16 (BASE PROJECT ALLOCATION - $146,000) 17 (LAND ALLOCATION - $8,000) 18 (DESIGN AND CONTINGENCIES - $52,000) 19 (6) CONRAIL RAILROAD OVER SR 3007, GEORGES 20 TOWNSHIP, BRIDGE REMOVAL 570,000 21 (BASE PROJECT ALLOCATION - $195,000) 22 (LAND ALLOCATION - $125,000) 23 (DESIGN AND CONTINGENCIES - $250,000) 24 (7) SR 0857 OVER BRANCH OF MOUNTAIN CREEK, 25 GEORGES TOWNSHIP, BRIDGE REPLACEMENT 990,000 26 (BASE PROJECT ALLOCATION - $700,000) 27 (LAND ALLOCATION - $40,000) 28 (DESIGN AND CONTINGENCIES - $250,000) 29 (8) SR 3010 OVER YORK RUN, GEORGES 30 TOWNSHIP, BRIDGE REPLACEMENT 440,000 20080S1503B2376 - 130 -
1 (BASE PROJECT ALLOCATION - $318,000) 2 (LAND ALLOCATION - $8,000) 3 (DESIGN AND CONTINGENCIES - $114,000) 4 (9) SR 3013, BRIDGE NO.16919 OVER MIDDLE 5 RUN, GERMAN TOWNSHIP, BRIDGE 6 REPLACEMENT 274,000 7 (BASE PROJECT ALLOCATION - $196,000) 8 (LAND ALLOCATION - $8,000) 9 (DESIGN AND CONTINGENCIES - $70,000) 10 (10) SR 3013, BRIDGE NO.16920 OVER MIDDLE 11 RUN, GERMAN TOWNSHIP, BRIDGE 12 REPLACEMENT 426,000 13 (BASE PROJECT ALLOCATION - $333,000) 14 (LAND ALLOCATION - $8,000) 15 (DESIGN AND CONTINGENCIES - $85,000) 16 (11) SR 4011 OVER BRANCH OF WASHWATER RUN, 17 JEFFERSON TOWNSHIP, BRIDGE REPLACEMENT 920,000 18 (BASE PROJECT ALLOCATION - $650,000) 19 (LAND ALLOCATION - $40,000) 20 (DESIGN AND CONTINGENCIES - $230,000) 21 (12) SR 4003 OVER COX RUN, LUZERNE 22 TOWNSHIP, BRIDGE REPLACEMENT 1,295,000 23 (BASE PROJECT ALLOCATION - $925,000) 24 (LAND ALLOCATION - $40,000) 25 (DESIGN AND CONTINGENCIES - $330,000) 26 (13) SR 4022 OVER RUSH RUN, LUZERNE 27 TOWNSHIP, BRIDGE REPLACEMENT 2,830,000 28 (BASE PROJECT ALLOCATION - $2,305,000) 29 (LAND ALLOCATION - $40,000) 30 (DESIGN AND CONTINGENCIES - $485,000) 20080S1503B2376 - 131 -
1 (14) SR 2021 OVER SHUTES RUN, NORTH UNION 2 TOWNSHIP, BRIDGE REPLACEMENT 1,050,000 3 (BASE PROJECT ALLOCATION - $250,000) 4 (LAND ALLOCATION - $250,000) 5 (DESIGN AND CONTINGENCIES - $550,000) 6 (15) SR 2023 OVER BENNINGTONS SPRING RUN, 7 NORTH UNION TOWNSHIP, BRIDGE 8 REPLACEMENT 313,000 9 (BASE PROJECT ALLOCATION - $225,000) 10 (LAND ALLOCATION - $8,000) 11 (DESIGN AND CONTINGENCIES - $80,000) 12 (16) SR 4038 OVER YOUGHIOGHENY RIVER 13 TRAIL, PERRY TOWNSHIP, BRIDGE 14 REPLACEMENT 6,450,000 15 (BASE PROJECT ALLOCATION - $6,000,000) 16 (LAND ALLOCATION - $100,000) 17 (DESIGN AND CONTINGENCIES - $350,000) 18 (17) SR 4038 OVER BRANCH OF WASHINGTON 19 RUN, PERRY TOWNSHIP, BRIDGE 20 REPLACEMENT 795,000 21 (BASE PROJECT ALLOCATION - $555,000) 22 (LAND ALLOCATION - $40,000) 23 (DESIGN AND CONTINGENCIES - $200,000) 24 (18) TR 763 OVER SR 4038, PERRY TOWNSHIP, 25 BRIDGE REPLACEMENT 6,450,000 26 (BASE PROJECT ALLOCATION - $6,000,000) 27 (LAND ALLOCATION - $100,000) 28 (DESIGN AND CONTINGENCIES - $350,000) 29 (19) SR 0381 OVER BRANCH OF INDIAN CREEK, 30 SALTLICK TOWNSHIP, BRIDGE REPLACEMENT 850,000 20080S1503B2376 - 132 -
1 (BASE PROJECT ALLOCATION - $600,000) 2 (LAND ALLOCATION - $40,000) 3 (DESIGN AND CONTINGENCIES - $210,000) 4 (20) SR 1007 OVER CHAMPION CREEK, SALTLICK 5 TOWNSHIP, BRIDGE REPLACEMENT 442,000 6 (BASE PROJECT ALLOCATION - $320,000) 7 (LAND ALLOCATION - $8,000) 8 (DESIGN AND CONTINGENCIES - $114,000) 9 (21) SR 1054 OVER NEWMYER RUN, SALTLICK 10 TOWNSHIP, BRIDGE REPLACEMENT 234,000 11 (BASE PROJECT ALLOCATION - $168,000) 12 (LAND ALLOCATION - $8,000) 13 (DESIGN AND CONTINGENCIES - $58,000) 14 (22) SR 0040 OVER SR 0043, SOUTH UNION 15 TOWNSHIP, BRIDGE REPLACEMENT 1,282,000 16 (BASE PROJECT ALLOCATION - $1,096,000) 17 (LAND ALLOCATION - $8,000) 18 (DESIGN AND CONTINGENCIES - $178,000) 19 (23) SR 2025 OVER BENNINGTONS SPRING RUN, 20 SOUTH UNION TOWNSHIP, BRIDGE 21 REPLACEMENT 1,225,000 22 (BASE PROJECT ALLOCATION - $750,000) 23 (LAND ALLOCATION - $75,000) 24 (DESIGN AND CONTINGENCIES - $400,000) 25 (24) SR 3009 OVER COAL LICK RUN, SOUTH 26 UNION TOWNSHIP, BRIDGE REPLACEMENT 1,050,000 27 (BASE PROJECT ALLOCATION - $650,000) 28 (LAND ALLOCATION - $150,000) 29 (DESIGN AND CONTINGENCIES - $250,000) 30 (25) SR 0119 OVER BRANCH OF GEORGES CREEK, 20080S1503B2376 - 133 -
1 SPRINGHILL TOWNSHIP, BRIDGE 2 REPLACEMENT 580,000 3 (BASE PROJECT ALLOCATION - $400,000) 4 (LAND ALLOCATION - $40,000) 5 (DESIGN AND CONTINGENCIES - $140,000) 6 (26) SR 3003 OVER BRANCH OF GEORGES CREEK, 7 SPRINGHILL TOWNSHIP, BRIDGE 8 REPLACEMENT 635,000 9 (BASE PROJECT ALLOCATION - $435,000) 10 (LAND ALLOCATION - $40,000) 11 (DESIGN AND CONTINGENCIES - $160,000) 12 (27) SR 0381 OVER BEAR RUN, STEWART 13 TOWNSHIP, BRIDGE REPLACEMENT 1,225,000 14 (BASE PROJECT ALLOCATION - $750,000) 15 (LAND ALLOCATION - $75,000) 16 (DESIGN AND CONTINGENCIES - $400,000) 17 (28) SR 4019 OVER BRANCH OF LITTLE 18 REDSTONE CREEK, WASHINGTON TOWNSHIP, 19 BRIDGE REPLACEMENT 162,000 20 (BASE PROJECT ALLOCATION - $114,000) 21 (LAND ALLOCATION - $8,000) 22 (DESIGN AND CONTINGENCIES - $40,000) 23 (29) SR 4019 OVER MILL RUN, WASHINGTON 24 TOWNSHIP, BRIDGE REPLACEMENT 560,000 25 (BASE PROJECT ALLOCATION - $380,000) 26 (LAND ALLOCATION - $40,000) 27 (DESIGN AND CONTINGENCIES - $140,000) 28 (30) SR 0040 OVER BRADOCKS RUN, WHARTON 29 TOWNSHIP, BRIDGE REPLACEMENT 880,000 30 (BASE PROJECT ALLOCATION - $620,000) 20080S1503B2376 - 134 -
1 (LAND ALLOCATION - $40,000) 2 (DESIGN AND CONTINGENCIES - $220,000) 3 (31) SR 2002 OVER BRANCH OF BIG SANDY 4 CREEK, WHARTON TOWNSHIP, BRIDGE 5 REPLACEMENT 520,000 6 (BASE PROJECT ALLOCATION - $350,000) 7 (LAND ALLOCATION - $40,000) 8 (DESIGN AND CONTINGENCIES - $130,000) 9 (32) SR 2003 OVER CHANEY RUN, WHARTON 10 TOWNSHIP, BRIDGE REPLACEMENT 1,145,000 11 (BASE PROJECT ALLOCATION - $815,000) 12 (LAND ALLOCATION - $40,000) 13 (DESIGN AND CONTINGENCIES - $290,000) 14 (33) SR 2011 OVER BEAVER CREEK, WHARTON 15 TOWNSHIP, BRIDGE REPLACEMENT 314,000 16 (BASE PROJECT ALLOCATION - $230,000) 17 (LAND ALLOCATION - $8,000) 18 (DESIGN AND CONTINGENCIES - $76,000) 19 SECTION 31. FOREST COUNTY. 20 (A) LOCAL BRIDGES (RESERVED) 21 (B) STATE BRIDGES 22 (1) SR 2002, FOREST ROAD OVER COLEMAN RUN, 23 BARNETT TOWNSHIP, BRIDGE 24 REHABILITATION 29,000 25 (BASE PROJECT ALLOCATION - $29,000) 26 (2) SR 3004, GOLINZA ROAD OVER BRANCH OF 27 COON CREEK, GREENE TOWNSHIP, BRIDGE 28 REPLACEMENT 130,000 29 (BASE PROJECT ALLOCATION - $130,000) 30 SECTION 32. FRANKLIN COUNTY. 20080S1503B2376 - 135 -
1 (A) LOCAL BRIDGES 2 (1) WASHINGTON TOWNSHIP, T-695 OVER 3 ANTIETAM CREEK, BRIDGE REPLACEMENT 1,250,000 4 (BASE PROJECT ALLOCATION - $1,250,000) 5 (B) STATE BRIDGES 6 (1) SR 3015, GUITNER ROAD OVER 7 CONOCOCHEAQUE CREEK, ANTRIM TOWNSHIP, 8 BRIDGE REHABILITATION 2,550,000 9 (BASE PROJECT ALLOCATION - $1,170,000) 10 (DESIGN AND CONTINGENCIES - $1,380,000) 11 (2) US 11 OVER CONOCOCHEAQUE CREEK, GREENE 12 TOWNSHIP, BRIDGE REPLACEMENT 120,000 13 (LAND ALLOCATION - $20,000) 14 (DESIGN AND CONTINGENCIES - $100,000) 15 (3) SR 4010 OVER ROCK SPRING BRANCH OF 16 BACK CREEK, HAMILTON TOWNSHIP, BRIDGE 17 REHABILITATION 2,210,000 18 (BASE PROJECT ALLOCATION - $1,000,000) 19 (DESIGN AND CONTINGENCIES - $1,210,000) 20 (4) PA 533 OVER LEHMAN RUN, LETTERKENNY 21 TOWNSHIP, BRIDGE REPLACEMENT 420,000 22 (BASE PROJECT ALLOCATION - $300,000) 23 (LAND ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $100,000) 25 (5) SR 0641, PA 641 OVER CLIPPINGER RUN, 26 LURGAN TOWNSHIP, BRIDGE REPLACEMENT 100,000 27 (BASE PROJECT ALLOCATION - $100,000) 28 (6) PA 416 OVER WEST BRANCH OF 29 CONOCOCHEAGUE CREEK, PETERS TOWNSHIP, 30 BRIDGE REPLACEMENT 420,000 20080S1503B2376 - 136 -
1 (BASE PROJECT ALLOCATION - $300,000) 2 (LAND ALLOCATION - $20,000) 3 (DESIGN AND CONTINGENCIES - $100,000) 4 (7) SR 0016 OVER BUCK RUN, PETERS 5 TOWNSHIP, BRIDGE REPLACEMENT 420,000 6 (BASE PROJECT ALLOCATION - $300,000) 7 (LAND ALLOCATION - $20,000) 8 (DESIGN AND CONTINGENCIES - $100,000) 9 (8) SR 4002 OVER ROCKY HOLLOW CREEK, 10 PETERS TOWNSHIP, BRIDGE REPLACEMENT 100,000 11 (BASE PROJECT ALLOCATION - $100,000) 12 (9) SR 3002, WILLIAMSON ROAD OVER BACK 13 CREEK, ST. THOMAS TOWNSHIP, BRIDGE 14 REHABILITATION 2,204,000 15 (BASE PROJECT ALLOCATION - $2,204,000) 16 (10) SR 0433, ROWE RUN ROAD OVER ROWE RUN, 17 SOUTHAMPTON TOWNSHIP, BRIDGE 18 REHABILITATION 1,680,000 19 (BASE PROJECT ALLOCATION - $760,000) 20 (DESIGN AND CONTINGENCIES - $920,000) 21 (11) SR 0016, BUCHANAN TRAIL OVER WEST 22 BRANCH OF LITTLE ANTIETAM CREEK, 23 WAYNESBORO BOROUGH, BRIDGE REPLACEMENT 370,000 24 (BASE PROJECT ALLOCATION - $250,000) 25 (LAND ALLOCATION - $20,000) 26 (DESIGN AND CONTINGENCIES - $100,000) 27 (12) I-81 NORTHBOUND, BRIDGE NO.17389, 28 OVER ABANDONED RAILROAD, GREENE 29 TOWNSHIP, BRIDGE REMOVAL 324,000 30 (BASE PROJECT ALLOCATION - $324,000) 20080S1503B2376 - 137 -
1 (13) I-81 NORTHBOUND, BRIDGE NO.17390, 2 OVER CONOCOCHEAGUE CREEK, GREENE 3 TOWNSHIP, BRIDGE REPLACEMENT 905,000 4 (BASE PROJECT ALLOCATION - $905,000) 5 (14) I-81 SOUTHBOUND, BRIDGE NO.17392, 6 OVER ABANDONED RAILROAD, GREENE 7 TOWNSHIP, BRIDGE REMOVAL 324,000 8 (BASE PROJECT ALLOCATION - $324,000) 9 (15) I-81 SOUTHBOUND, BRIDGE NO.17393, 10 OVER CONOCOCHEAGUE CREEK, GREENE 11 TOWNSHIP, BRIDGE REPLACEMENT 905,000 12 (BASE PROJECT ALLOCATION - $905,000) 13 (16) SR 1003, BRIDGE NO.17483, OVER I-81, 14 GREENE TOWNSHIP, BRIDGE REHABILITATION 130,000 15 (BASE PROJECT ALLOCATION - $130,000) 16 SECTION 33. FULTON COUNTY. 17 (A) LOCAL BRIDGES (RESERVED) 18 (B) STATE BRIDGES 19 (1) I-70 OVER TRIBUTARY OF LITTLE 20 TONOLOWAY CREEK, BETHEL TOWNSHIP, 21 BRIDGE REPLACEMENT 605,000 22 (BASE PROJECT ALLOCATION - $500,000) 23 (DESIGN AND CONTINGENCIES - $105,000) 24 (2) SR 0484 OVER I-70, BETHEL TOWNSHIP, 25 BRIDGE REHABILITATION 869,000 26 (BASE PROJECT ALLOCATION - $769,000) 27 (DESIGN AND CONTINGENCIES - $100,000) 28 (3) SR 1010 OVER SOUTH BRANCH OF LITTLE 29 AUGHWICK CREEK, DUBLIN TOWNSHIP, BRIDGE 30 REHABILITATION 533,000 20080S1503B2376 - 138 -
1 (BASE PROJECT ALLOCATION - $533,000) 2 (4) SR 0030 OVER PATTERSON RUN, LICKING 3 CREEK TOWNSHIP, BRIDGE REPLACEMENT 433,000 4 (BASE PROJECT ALLOCATION - $370,000) 5 (LAND ALLOCATION - $58,000) 6 (DESIGN AND CONTINGENCIES - $5,000) 7 (5) SR 0928 OVER LICKING CREEK, THOMPSON 8 TOWNSHIP, BRIDGE REPLACEMENT 275,000 9 (BASE PROJECT ALLOCATION - $275,000) 10 SECTION 34. GREENE COUNTY. 11 (A) LOCAL BRIDGES 12 (1) PERRY TOWNSHIP, T-008 OVER SHANNON 13 RUN, BRIDGE REPLACEMENT 1,000,000 14 (BASE PROJECT ALLOCATION - $1,000,000) 15 (2) MORGAN TOWNSHIP, T-999 OVER BURSON 16 PLAN, BRIDGE REPLACEMENT 1,600,000 17 (BASE PROJECT ALLOCATION - $1,600,000) 18 (3) RICHHILL TOWNSHIP, T-078 OVER OWENS 19 RUN, BRIDGE REPLACEMENT 800,000 20 (BASE PROJECT ALLOCATION - $800,000) 21 (4) CUMBERLAND TOWNSHIP, T-015 OVER MUDDY 22 CREEK, BRIDGE REPLACEMENT 1,000,000 23 (BASE PROJECT ALLOCATION - $1,000,000) 24 (5) WASHINGTON TOWNSHIP, T-097 OVER 25 CRAYNES RUN, BRIDGE REPLACEMENT 750,000 26 (BASE PROJECT ALLOCATION - $750,000) 27 (6) GILMORE TOWNSHIP, T-055 OVER BLOODY 28 RUN, BRIDGE REPLACEMENT 600,000 29 (BASE PROJECT ALLOCATION - $600,000) 30 (7) MORRIS TOWNSHIP, T-063 OVER GRAYS 20080S1503B2376 - 139 -
1 FORK, BRIDGE REPLACEMENT 650,000 2 (BASE PROJECT ALLOCATION - $650,000) 3 (8) FRANKLIN TOWNSHIP, T-031 OVER SMITH 4 CREEK, BRIDGE REPLACEMENT 1,000,000 5 (BASE PROJECT ALLOCATION - $1,000,000) 6 (9) MORRIS TOWNSHIP, T-075 OVER BROWNS 7 CREEK, BRIDGE REPLACEMENT 1,000,000 8 (BASE PROJECT ALLOCATION - $1,000,000) 9 (10) MORGAN TOWNSHIP, T-089 OVER BROWNS 10 CREEK, BRIDGE REPLACEMENT 750,000 11 (BASE PROJECT ALLOCATION - $750,000) 12 (B) STATE BRIDGES 13 (1) SR 3001 OVER SOUTH FORK OF WHEELING 14 CREEK, ALEPPO TOWNSHIP, BRIDGE 15 REPLACEMENT 1,225,000 16 (BASE PROJECT ALLOCATION - $750,000) 17 (LAND ALLOCATION - $75,000) 18 (DESIGN AND CONTINGENCIES - $400,000) 19 (2) SR 3012 OVER SOUTH FORK OF WHEELING 20 CREEK, ALEPPO TOWNSHIP, BRIDGE 21 REPLACEMENT 368,000 22 (BASE PROJECT ALLOCATION - $264,000) 23 (LAND ALLOCATION - $8,000) 24 (DESIGN AND CONTINGENCIES - $96,000) 25 (3) SR 3018 OVER BRANCH OF BLACKS CREEK, 26 ALEPPO TOWNSHIP, BRIDGE REPLACEMENT 780,000 27 (BASE PROJECT ALLOCATION - $550,000) 28 (LAND ALLOCATION - $40,000) 29 (DESIGN AND CONTINGENCIES - $190,000) 30 (4) SR 0018 OVER HOGE RUN, CENTER 20080S1503B2376 - 140 -
1 TOWNSHIP, BRIDGE REPLACEMENT 1,225,000 2 (BASE PROJECT ALLOCATION - $750,000) 3 (LAND ALLOCATION - $75,000) 4 (DESIGN AND CONTINGENCIES - $400,000) 5 (5) SR 0018 OVER BRANCH OF MCCOURTNEY RUN, 6 CENTER TOWNSHIP, BRIDGE REPLACEMENT 1,225,000 7 (BASE PROJECT ALLOCATION - $750,000) 8 (LAND ALLOCATION - $75,000) 9 (DESIGN AND CONTINGENCIES - $400,000) 10 (6) SR 3013 OVER BRANCH OF PURSLEY CREEK, 11 CENTER TOWNSHIP, BRIDGE REPLACEMENT 485,000 12 (BASE PROJECT ALLOCATION - $325,000) 13 (LAND ALLOCATION - $40,000) 14 (DESIGN AND CONTINGENCIES - $120,000) 15 (7) SR 1017 OVER BRANCH OF PUMPKIN RUN, 16 CUMBERLAND TOWNSHIP, BRIDGE 17 REPLACEMENT 218,000 18 (BASE PROJECT ALLOCATION - $156,000) 19 (LAND ALLOCATION - $8,000) 20 (DESIGN AND CONTINGENCIES - $54,000) 21 (8) SR 1021 OVER BRANCH OF MUDDY CREEK, 22 CUMBERLAND TOWNSHIP, BRIDGE 23 REPLACEMENT 820,000 24 (BASE PROJECT ALLOCATION - $580,000) 25 (LAND ALLOCATION - $40,000) 26 (DESIGN AND CONTINGENCIES - $200,000) 27 (9) SR 1021 OVER MUDDY CREEK, CUMBERLAND 28 TOWNSHIP, BRIDGE REPLACEMENT 1,700,000 29 (BASE PROJECT ALLOCATION - $1,400,000) 30 (DESIGN AND CONTINGENCIES - $300,000) 20080S1503B2376 - 141 -
1 (10) SR 2013 OVER MUDDY CREEK, CUMBERLAND 2 TOWNSHIP, BRIDGE REPLACEMENT 2,300,000 3 (BASE PROJECT ALLOCATION - $1,900,000) 4 (LAND ALLOCATION - $50,000) 5 (DESIGN AND CONTINGENCIES - $350,000) 6 (11) SR 0088, BRIDGE NO.18127 OVER 7 TRIBUTARY OF MONONGAHELA RIVER, DUNKARD 8 TOWNSHIP, BRIDGE REPLACEMENT 540,000 9 (BASE PROJECT ALLOCATION - $370,000) 10 (LAND ALLOCATION - $40,000) 11 (DESIGN AND CONTINGENCIES - $130,000) 12 (12) SR 0088, BRIDGE NO.18129 OVER 13 TRIBUTARY OF MONONGAHELA RIVER, DUNKARD 14 TOWNSHIP, BRIDGE REPLACEMENT 820,000 15 (BASE PROJECT ALLOCATION - $580,000) 16 (LAND ALLOCATION - $40,000) 17 (DESIGN AND CONTINGENCIES - $200,000) 18 (13) SR 2021 OVER DUNKARD CREEK, DUNKARD 19 TOWNSHIP, BRIDGE REPLACEMENT 1,003,000 20 (BASE PROJECT ALLOCATION - $839,000) 21 (LAND ALLOCATION - $8,000) 22 (DESIGN AND CONTINGENCIES - $156,000) 23 (14) SR 0218, BRIDGE NO.18174 OVER BRANCH 24 OF SMITH CREEK, FRANKLIN TOWNSHIP, 25 BRIDGE REPLACEMENT 850,000 26 (BASE PROJECT ALLOCATION - $600,000) 27 (LAND ALLOCATION - $40,000) 28 (DESIGN AND CONTINGENCIES - $210,000) 29 (15) SR 0218, BRIDGE NO.18176 OVER BRANCH 30 OF SMITH CREEK, FRANKLIN TOWNSHIP, 20080S1503B2376 - 142 -
1 BRIDGE REPLACEMENT 1,060,000 2 (BASE PROJECT ALLOCATION - $750,000) 3 (LAND ALLOCATION - $40,000) 4 (DESIGN AND CONTINGENCIES - $270,000) 5 (16) SR 1003 OVER SR 0079, FRANKLIN 6 TOWNSHIP, BRIDGE REPLACEMENT 1,540,000 7 (BASE PROJECT ALLOCATION - $1,300,000) 8 (LAND ALLOCATION - $40,000) 9 (DESIGN AND CONTINGENCIES - $20,000) 10 (17) SR 1024 OVER SR 0079, FRANKLIN 11 TOWNSHIP, BRIDGE REPLACEMENT 1,540,000 12 (BASE PROJECT ALLOCATION - $1,300,000) 13 (LAND ALLOCATION - $40,000) 14 (DESIGN AND CONTINGENCIES - $200,000) 15 (18) SR 4007 OVER TEN MILE CREEK, GRAY 16 TOWNSHIP, BRIDGE REPLACEMENT 830,000 17 (BASE PROJECT ALLOCATION - $580,000) 18 (LAND ALLOCATION - $40,000) 19 (DESIGN AND CONTINGENCIES - $210,000) 20 (19) SR 3009 OVER BRANCH OF TOMS RUN, 21 JACKSON TOWNSHIP, BRIDGE REMOVAL 385,000 22 (BASE PROJECT ALLOCATION - $255,000) 23 (LAND ALLOCATION - $40,000) 24 (DESIGN AND CONTINGENCIES - $90,000) 25 (20) SR 0188 OVER BRANCH OF SOUTH FORK OF 26 TEN MILE CREEK, JEFFERSON TOWNSHIP, 27 BRIDGE REPLACEMENT 2,500,000 28 (BASE PROJECT ALLOCATION - $2,100,000) 29 (LAND ALLOCATION - $50,000) 30 (DESIGN AND CONTINGENCIES - $350,000) 20080S1503B2376 - 143 -
1 (21) SR 1016 OVER LITTLE WHITELEY CREEK, 2 MONONGAHELA TOWNSHIP, BRIDGE 3 REPLACEMENT 325,000 4 (BASE PROJECT ALLOCATION - $150,000) 5 (LAND ALLOCATION - $75,000) 6 (DESIGN AND CONTINGENCIES - $100,000) 7 (22) SR 2016 OVER CUMBERLAND MINE 8 RAILROAD, MONONGAHELA TOWNSHIP, BRIDGE 9 REPLACEMENT 390,000 10 (BASE PROJECT ALLOCATION - $299,000) 11 (LAND ALLOCATION - $8,000) 12 (DESIGN AND CONTINGENCIES - $83,000) 13 (23) SR 0221 OVER GRIMES RUN, MORGAN 14 TOWNSHIP, BRIDGE REPLACEMENT 880,000 15 (BASE PROJECT ALLOCATION - $620,000) 16 (LAND ALLOCATION - $40,000) 17 (DESIGN AND CONTINGENCIES - $220,000) 18 (24) SR 1014 OVER BRANCH OF CASTILE RUN, 19 MORGAN TOWNSHIP, BRIDGE REPLACEMENT 385,000 20 (BASE PROJECT ALLOCATION - $255,000) 21 (LAND ALLOCATION - $40,000) 22 (DESIGN AND CONTINGENCIES - $90,000) 23 (25) SR 2003 OVER BACON RUN, PERRY 24 TOWNSHIP, BRIDGE REPLACEMENT 820,000 25 (BASE PROJECT ALLOCATION - $580,000) 26 (LAND ALLOCATION - $40,000) 27 (DESIGN AND CONTINGENCIES - $200,000) 28 (26) SR 1010 OVER PUMPKIN RUN, RICES 29 LANDING BOROUGH, BRIDGE REPLACEMENT 808,000 30 (BASE PROJECT ALLOCATION - $736,000) 20080S1503B2376 - 144 -
1 (LAND ALLOCATION - $8,000) 2 (DESIGN AND CONTINGENCIES - $64,000) 3 (27) SR 3001 OVER BRANCH OF SOUTH FORK OF 4 WHEELING CREEK, RICHHILL TOWNSHIP, 5 BRIDGE REPLACEMENT 825,000 6 (BASE PROJECT ALLOCATION - $585,000) 7 (LAND ALLOCATION - $40,000) 8 (DESIGN AND CONTINGENCIES - $200,000) 9 (28) SR 3007 OVER WHITETHORN RUN, RICHHILL 10 TOWNSHIP, BRIDGE REPLACEMENT 274,000 11 (BASE PROJECT ALLOCATION - $196,000) 12 (LAND ALLOCATION - $8,000) 13 (DESIGN AND CONTINGENCIES - $70,000) 14 (29) SR 3022 OVER BRANCH OF NORTH FORK OF 15 WHEELING CREEK, RICHHILL TOWNSHIP, 16 BRIDGE REPLACEMENT 730,000 17 (BASE PROJECT ALLOCATION - $510,000) 18 (LAND ALLOCATION - $40,000) 19 (DESIGN AND CONTINGENCIES - $180,000) 20 (30) SR 4007 OVER OWENS RUN, RICHHILL 21 TOWNSHIP, BRIDGE REPLACEMENT 605,000 22 (BASE PROJECT ALLOCATION - $415,000) 23 (LAND ALLOCATION - $40,000) 24 (DESIGN AND CONTINGENCIES - $150,000) 25 (31) SR 3010 OVER COON RUN, SPRINGHILL 26 TOWNSHIP, BRIDGE REPLACEMENT 830,000 27 (BASE PROJECT ALLOCATION - $585,000) 28 (LAND ALLOCATION - $40,000) 29 (DESIGN AND CONTINGENCIES - $205,000) 30 (32) SR 0079, BRIDGE NO.18120 OVER SR 20080S1503B2376 - 145 -
1 0221, RUFF CREEK, WASHINGTON TOWNSHIP, 2 BRIDGE REPLACEMENT 870,000 3 (BASE PROJECT ALLOCATION - $750,000) 4 (LAND ALLOCATION - $20,000) 5 (DESIGN AND CONTINGENCIES - $100,000) 6 (33) SR 0079, BRIDGE NO.18121 OVER SR 7 0221, RUFF CREEK, WASHINGTON TOWNSHIP, 8 BRIDGE REPLACEMENT 870,000 9 (BASE PROJECT ALLOCATION - $750,000) 10 (LAND ALLOCATION - $20,000) 11 (DESIGN AND CONTINGENCIES - $100,000) 12 (34) SR 2001 OVER BRANCH OF RUDOLPH RUN, 13 WAYNE TOWNSHIP, BRIDGE REPLACEMENT 223,000 14 (BASE PROJECT ALLOCATION - $159,000) 15 (LAND ALLOCATION - $8,000) 16 (DESIGN AND CONTINGENCIES - $56,000) 17 (35) SR 2003 OVER WHITELEY CREEK, WHITELEY 18 TOWNSHIP, BRIDGE REPLACEMENT 318,000 19 (BASE PROJECT ALLOCATION - $230,000) 20 (LAND ALLOCATION - $8,000) 21 (DESIGN AND CONTINGENCIES - $80,000) 22 (36) SR 2018 OVER BRANCH OF WHITELEY 23 CREEK, WHITELEY TOWNSHIP, BRIDGE 24 REPLACEMENT 985,000 25 (BASE PROJECT ALLOCATION - $695,000) 26 (LAND ALLOCATION - $40,000) 27 (DESIGN AND CONTINGENCIES - $250,000) 28 (37) SR 2030 OVER SR 0079, WHITELEY 29 TOWNSHIP, BRIDGE REPLACEMENT 1,540,000 30 (BASE PROJECT ALLOCATION - $1,300,000) 20080S1503B2376 - 146 -
1 (LAND ALLOCATION - $40,000) 2 (DESIGN AND CONTINGENCIES - $200,000) 3 SECTION 35. HUNTINGDON COUNTY. 4 (A) LOCAL BRIDGES (RESERVED) 5 (B) STATE BRIDGES 6 (1) SR 3008 OVER LITTLE TROUGH CREEK, CASS 7 TOWNSHIP, BRIDGE REPLACEMENT 275,000 8 (BASE PROJECT ALLOCATION - $275,000) 9 (2) SR 2024 OVER SIDELING HILL CREEK, CLAY 10 TOWNSHIP, BRIDGE REPLACEMENT 275,000 11 (BASE PROJECT ALLOCATION - $275,000) 12 (3) SR 3039 OVER BRANCH OF CROOKED CREEK, 13 PORTER TOWNSHIP, BRIDGE REHABILITATION 70,000 14 (BASE PROJECT ALLOCATION - $70,000) 15 SECTION 36. INDIANA COUNTY. 16 (A) LOCAL BRIDGES (RESERVED) 17 (B) STATE BRIDGES 18 (1) SR 0056 OVER WALKER RUN, ARMSTRONG 19 TOWNSHIP, BRIDGE REPLACEMENT 261,000 20 (BASE PROJECT ALLOCATION - $81,000) 21 (LAND ALLOCATION - $40,000) 22 (DESIGN AND CONTINGENCIES - $140,000) 23 (2) SR 4001 OVER TRIBUTARY OF MITCHELL 24 RUN, ARMSTRONG TOWNSHIP, BRIDGE 25 REPLACEMENT 229,000 26 (BASE PROJECT ALLOCATION - $49,000) 27 (LAND ALLOCATION - $40,000) 28 (DESIGN AND CONTINGENCIES - $140,000) 29 (3) SR 4002 OVER MITCHELL RUN, ARMSTRONG 30 TOWNSHIP, BRIDGE REPLACEMENT 254,000 20080S1503B2376 - 147 -
1 (BASE PROJECT ALLOCATION - $74,000) 2 (LAND ALLOCATION - $40,000) 3 (DESIGN AND CONTINGENCIES - $140,000) 4 (4) SR 0286 OVER HORTON RUN, BANKS 5 TOWNSHIP, BRIDGE REPLACEMENT 294,000 6 (BASE PROJECT ALLOCATION - $114,000) 7 (LAND ALLOCATION - $40,000) 8 (DESIGN AND CONTINGENCIES - $140,000) 9 (5) SR 1033 OVER SOUTH BRANCH OF BEAR RUN, 10 BANKS TOWNSHIP, BRIDGE REPLACEMENT 236,000 11 (BASE PROJECT ALLOCATION - $56,000) 12 (LAND ALLOCATION - $40,000) 13 (DESIGN AND CONTINGENCIES - $140,000) 14 (6) SR 0217 OVER GREYS RUN, BLACK LICK 15 TOWNSHIP, BRIDGE REPLACEMENT 224,000 16 (BASE PROJECT ALLOCATION - $44,000) 17 (LAND ALLOCATION - $40,000) 18 (DESIGN AND CONTINGENCIES - $140,000) 19 (7) SR 3013 OVER STEWART RUN, BLACK LICK 20 TOWNSHIP, BRIDGE REPLACEMENT 249,000 21 (BASE PROJECT ALLOCATION - $69,000) 22 (LAND ALLOCATION - $40,000) 23 (DESIGN AND CONTINGENCIES - $140,000) 24 (8) SR 0217 OVER FALLING RUN, BLAIRSVILLE 25 BOROUGH, BRIDGE REPLACEMENT 231,000 26 (BASE PROJECT ALLOCATION - $51,000) 27 (LAND ALLOCATION - $40,000) 28 (DESIGN AND CONTINGENCIES - $140,000) 29 (9) SR 0056 OVER LITTLE BRUSH CREEK, BRUSH 30 VALLEY TOWNSHIP, BRIDGE REPLACEMENT 344,000 20080S1503B2376 - 148 -
1 (BASE PROJECT ALLOCATION - $164,000) 2 (LAND ALLOCATION - $40,000) 3 (DESIGN AND CONTINGENCIES - $140,000) 4 (10) SR 2018 OVER TRIBUTARY OF BRUSH 5 CREEK, BRUSH VALLEY TOWNSHIP, BRIDGE 6 REPLACEMENT 224,000 7 (BASE PROJECT ALLOCATION - $44,000) 8 (LAND ALLOCATION - $40,000) 9 (DESIGN AND CONTINGENCIES - $140,000) 10 (11) SR 2012 OVER MARDIS RUN, BUFFINGTON 11 TOWNSHIP, BRIDGE REPLACEMENT 292,000 12 (BASE PROJECT ALLOCATION - $112,000) 13 (LAND ALLOCATION - $40,000) 14 (DESIGN AND CONTINGENCIES - $140,000) 15 (12) SR 2013 OVER TRIBUTARY OF BLACKLICK 16 CREEK, BUFFINGTON TOWNSHIP, BRIDGE 17 REPLACEMENT 233,000 18 (BASE PROJECT ALLOCATION - $53,000) 19 (LAND ALLOCATION - $40,000) 20 (DESIGN AND CONTINGENCIES - $140,000) 21 (13) SR 1038 OVER BROADHEAD RUN, CANOE 22 TOWNSHIP, BRIDGE REPLACEMENT 215,000 23 (BASE PROJECT ALLOCATION - $35,000) 24 (LAND ALLOCATION - $40,000) 25 (DESIGN AND CONTINGENCIES - $140,000) 26 (14) SR 1038 OVER STRAIGHT RUN, CANOE 27 TOWNSHIP, BRIDGE REPLACEMENT 312,000 28 (BASE PROJECT ALLOCATION - $132,000) 29 (LAND ALLOCATION - $40,000) 30 (DESIGN AND CONTINGENCIES - $140,000) 20080S1503B2376 - 149 -
1 (15) SR 1038 OVER BREWER RUN, CANOE 2 TOWNSHIP, BRIDGE REPLACEMENT 239,000 3 (BASE PROJECT ALLOCATION - $59,000) 4 (LAND ALLOCATION - $40,000) 5 (DESIGN AND CONTINGENCIES - $140,000) 6 (16) SR 1038 OVER LEASURE RUN, CANOE 7 TOWNSHIP, BRIDGE REPLACEMENT 224,000 8 (BASE PROJECT ALLOCATION - $44,000) 9 (LAND ALLOCATION - $40,000) 10 (DESIGN AND CONTINGENCIES - $140,000) 11 (17) SR 1045 OVER PAINTER RUN, CANOE 12 TOWNSHIP, BRIDGE REPLACEMENT 243,000 13 (BASE PROJECT ALLOCATION - $63,000) 14 (LAND ALLOCATION - $40,000) 15 (DESIGN AND CONTINGENCIES - $140,000) 16 (18) SR 1047 OVER TRIBUTARY OF CANOE 17 CREEK, CANOE TOWNSHIP, BRIDGE 18 REPLACEMENT 235,000 19 (BASE PROJECT ALLOCATION - $150,000) 20 (LAND ALLOCATION - $15,000) 21 (DESIGN AND CONTINGENCIES - $70,000) 22 (19) SR 1052 OVER TRIBUTARY OF CANOE 23 CREEK, CANOE TOWNSHIP, BRIDGE 24 REPLACEMENT 240,000 25 (BASE PROJECT ALLOCATION - $60,000) 26 (LAND ALLOCATION - $40,000) 27 (DESIGN AND CONTINGENCIES - $140,000) 28 (20) SR 3014 OVER STEWART RUN, CENTER 29 TOWNSHIP, BRIDGE REPLACEMENT 203,000 30 (BASE PROJECT ALLOCATION - $23,000) 20080S1503B2376 - 150 -
1 (LAND ALLOCATION - $40,000) 2 (DESIGN AND CONTINGENCIES - $140,000) 3 (21) SR 0422 EASTBOUND OVER T-604, METZ 4 ROAD, CHERRYHILL TOWNSHIP, BRIDGE 5 REHABILITATION 750,000 6 (BASE PROJECT ALLOCATION - $750,000) 7 (22) SR 0422 WESTBOUND OVER T-604, METZ 8 ROAD, CHERRYHILL TOWNSHIP, BRIDGE 9 REHABILITATION 750,000 10 (BASE PROJECT ALLOCATION - $750,000) 11 (23) SR 1012 OVER PENN RUN, CHERRYHILL 12 TOWNSHIP, BRIDGE REPLACEMENT 277,000 13 (BASE PROJECT ALLOCATION - $97,000) 14 (LAND ALLOCATION - $40,000) 15 (DESIGN AND CONTINGENCIES - $140,000) 16 (24) SR 0286, BRIDGE NO.19082 OVER 17 BLACKLEGS CREEK, CONEMAUGH TOWNSHIP, 18 BRIDGE REPLACEMENT 520,000 19 (BASE PROJECT ALLOCATION - $340,000) 20 (LAND ALLOCATION - $40,000) 21 (DESIGN AND CONTINGENCIES - $140,000) 22 (25) SR 3003 OVER ELDERS RUN, CONEMAUGH 23 TOWNSHIP, BRIDGE REPLACEMENT 256,000 24 (BASE PROJECT ALLOCATION - $76,000) 25 (LAND ALLOCATION - $40,000) 26 (DESIGN AND CONTINGENCIES - $140,000) 27 (26) SR 3007 OVER MARSHALL RUN, CONEMAUGH 28 TOWNSHIP, BRIDGE REPLACEMENT 230,000 29 (BASE PROJECT ALLOCATION - $50,000) 30 (LAND ALLOCATION - $40,000) 20080S1503B2376 - 151 -
1 (DESIGN AND CONTINGENCIES - $140,000) 2 (27) SR 3007 OVER ROARING RUN, CONEMAUGH 3 TOWNSHIP, BRIDGE REPLACEMENT 235,000 4 (BASE PROJECT ALLOCATION - $55,000) 5 (LAND ALLOCATION - $40,000) 6 (DESIGN AND CONTINGENCIES - $140,000) 7 (28) SR 3009 OVER AULTMANS RUN, CONEMAUGH 8 TOWNSHIP, BRIDGE REPLACEMENT 1,276,000 9 (BASE PROJECT ALLOCATION - $1,096,000) 10 (LAND ALLOCATION - $40,000) 11 (DESIGN AND CONTINGENCIES - $140,000) 12 (29) SR 0110 OVER CROOKED CREEK, CREEKSIDE 13 BOROUGH, BRIDGE REPLACEMENT 1,039,000 14 (BASE PROJECT ALLOCATION - $859,000) 15 (LAND ALLOCATION - $40,000) 16 (DESIGN AND CONTINGENCIES - $140,000) 17 (30) SR 0119 OVER PINE RUN, EAST MAHONING 18 TOWNSHIP, BRIDGE REPLACEMENT 343,000 19 (BASE PROJECT ALLOCATION - $163,000) 20 (LAND ALLOCATION - $40,000) 21 (DESIGN AND CONTINGENCIES - $140,000) 22 (31) SR 0403 OVER PINE RUN, EAST MAHONING 23 TOWNSHIP, BRIDGE REPLACEMENT 365,000 24 (BASE PROJECT ALLOCATION - $185,000) 25 (LAND ALLOCATION - $40,000) 26 (DESIGN AND CONTINGENCIES - $140,000) 27 (32) SR 4015 OVER ROSS RUN, EAST MAHONING 28 TOWNSHIP, BRIDGE REPLACEMENT 284,000 29 (BASE PROJECT ALLOCATION - $104,000) 30 (LAND ALLOCATION - $40,000) 20080S1503B2376 - 152 -
1 (DESIGN AND CONTINGENCIES - $140,000) 2 (33) SR 1020 OVER LITTLE MAHONING CREEK, 3 GRANT TOWNSHIP, BRIDGE REPLACEMENT 257,000 4 (BASE PROJECT ALLOCATION - $77,000) 5 (LAND ALLOCATION - $40,000) 6 (DESIGN AND CONTINGENCIES - $140,000) 7 (34) SR 1034 OVER LITTLE MAHONING CREEK, 8 GRANT TOWNSHIP, BRIDGE REPLACEMENT 443,000 9 (BASE PROJECT ALLOCATION - $263,000) 10 (LAND ALLOCATION - $40,000) 11 (DESIGN AND CONTINGENCIES - $140,000) 12 (35) SR 0240 OVER SOUTH BRANCH OF TWO LICK 13 CREEK, GREEN TOWNSHIP, BRIDGE 14 REPLACEMENT 226,000 15 (BASE PROJECT ALLOCATION - $46,000) 16 (LAND ALLOCATION - $40,000) 17 (DESIGN AND CONTINGENCIES - $140,000) 18 (36) SR 0286 OVER NORTH BRANCH OF TWO LICK 19 CREEK, GREEN TOWNSHIP, BRIDGE 20 REPLACEMENT 221,000 21 (BASE PROJECT ALLOCATION - $41,000) 22 (LAND ALLOCATION - $40,000) 23 (DESIGN AND CONTINGENCIES - $140,000) 24 (37) SR 0403, BRIDGE NO.19136 OVER 25 TRIBUTARY OF DIXON RUN, GREEN TOWNSHIP, 26 BRIDGE REPLACEMENT 240,000 27 (BASE PROJECT ALLOCATION - $60,000) 28 (LAND ALLOCATION - $40,000) 29 (DESIGN AND CONTINGENCIES - $140,000) 30 (38) SR 0403, BRIDGE NO.19138 OVER 20080S1503B2376 - 153 -
1 TRIBUTARY OF DIXON RUN, GREEN TOWNSHIP, 2 BRIDGE REPLACEMENT 323,000 3 (BASE PROJECT ALLOCATION - $143,000) 4 (LAND ALLOCATION - $40,000) 5 (DESIGN AND CONTINGENCIES - $140,000) 6 (39) SR 1014 OVER WHITAKER RUN, GREEN 7 TOWNSHIP, BRIDGE REPLACEMENT 259,000 8 (BASE PROJECT ALLOCATION - $79,000) 9 (LAND ALLOCATION - $40,000) 10 (DESIGN AND CONTINGENCIES - $140,000) 11 (40) SR 1015 OVER SOUTH BRANCH OF TWO LICK 12 CREEK, GREEN TOWNSHIP, BRIDGE 13 REPLACEMENT 235,000 14 (BASE PROJECT ALLOCATION - $55,000) 15 (LAND ALLOCATION - $40,000) 16 (DESIGN AND CONTINGENCIES - $140,000) 17 (41) SR 1018 OVER TRIBUTARY OF DIXON RUN, 18 GREEN TOWNSHIP, BRIDGE REPLACEMENT 247,000 19 (BASE PROJECT ALLOCATION - $67,000) 20 (LAND ALLOCATION - $40,000) 21 (DESIGN AND CONTINGENCIES - $140,000) 22 (42) SR 0286 OVER MARSH RUN, INDIANA 23 BOROUGH, BRIDGE REPLACEMENT 280,000 24 (BASE PROJECT ALLOCATION - $100,000) 25 (LAND ALLOCATION - $40,000) 26 (DESIGN AND CONTINGENCIES - $140,000) 27 (43) SR 3035 OVER STONEY RUN, INDIANA 28 BOROUGH, BRIDGE REPLACEMENT 306,000 29 (BASE PROJECT ALLOCATION - $126,000) 30 (LAND ALLOCATION - $40,000) 20080S1503B2376 - 154 -
1 (DESIGN AND CONTINGENCIES - $140,000) 2 (44) SR 4032 OVER TRIBUTARY OF WHITES RUN, 3 INDIANA BOROUGH, BRIDGE REPLACEMENT 1,190,000 4 (BASE PROJECT ALLOCATION - $540,000) 5 (LAND ALLOCATION - $150,000) 6 (DESIGN AND CONTINGENCIES - $500,000) 7 (45) SR 4032 OVER WHITES RUN, INDIANA 8 BOROUGH, BRIDGE REPLACEMENT 282,000 9 (BASE PROJECT ALLOCATION - $102,000) 10 (LAND ALLOCATION - $40,000) 11 (DESIGN AND CONTINGENCIES - $140,000) 12 (46) SR 0286 OVER CUSH CREEK, MONTGOMERY 13 TOWNSHIP, BRIDGE REPLACEMENT 262,000 14 (BASE PROJECT ALLOCATION - $82,000) 15 (LAND ALLOCATION - $40,000) 16 (DESIGN AND CONTINGENCIES - $140,000) 17 (47) SR 1015 OVER HAZELET RUN, MONTGOMERY 18 TOWNSHIP, BRIDGE REPLACEMENT 235,000 19 (BASE PROJECT ALLOCATION - $55,000) 20 (LAND ALLOCATION - $40,000) 21 (DESIGN AND CONTINGENCIES - $140,000) 22 (48) SR 0210 OVER LITTLE MAHONING CREEK, 23 NORTH MAHONING TOWNSHIP, BRIDGE 24 REPLACEMENT 794,000 25 (BASE PROJECT ALLOCATION - $614,000) 26 (LAND ALLOCATION - $40,000) 27 (DESIGN AND CONTINGENCIES - $140,000) 28 (49) SR 0210 OVER DUTCH RUN, NORTH 29 MAHONING TOWNSHIP, BRIDGE REPLACEMENT 243,000 30 (BASE PROJECT ALLOCATION - $63,000) 20080S1503B2376 - 155 -
1 (LAND ALLOCATION - $40,000) 2 (DESIGN AND CONTINGENCIES - $140,000) 3 (50) SR 0403 OVER LITTLE YELLOW CREEK, 4 PINE TOWNSHIP, BRIDGE REPLACEMENT 245,000 5 (BASE PROJECT ALLOCATION - $65,000) 6 (LAND ALLOCATION - $40,000) 7 (DESIGN AND CONTINGENCIES - $140,000) 8 (51) SR 1019 OVER YELLOW CREEK, PINE 9 TOWNSHIP, BRIDGE REPLACEMENT 221,000 10 (BASE PROJECT ALLOCATION - $41,000) 11 (LAND ALLOCATION - $40,000) 12 (DESIGN AND CONTINGENCIES - $140,000) 13 (52) SR 0085 OVER NORTH BRANCH OF PLUM 14 CREEK, PLUMVILLE BOROUGH, BRIDGE 15 REPLACEMENT 288,000 16 (BASE PROJECT ALLOCATION - $108,000) 17 (LAND ALLOCATION - $40,000) 18 (DESIGN AND CONTINGENCIES - $140,000) 19 (53) SR 0110 OVER TRIBUTARY OF MCKEE RUN, 20 RAYNE TOWNSHIP, BRIDGE REPLACEMENT 267,000 21 (BASE PROJECT ALLOCATION - $87,000) 22 (LAND ALLOCATION - $40,000) 23 (DESIGN AND CONTINGENCIES - $140,000) 24 (54) SR 0286 OVER CROOKED CREEK, RAYNE 25 TOWNSHIP, BRIDGE REPLACEMENT 278,000 26 (BASE PROJECT ALLOCATION - $98,000) 27 (LAND ALLOCATION - $40,000) 28 (DESIGN AND CONTINGENCIES - $140,000) 29 (55) SR 1005 OVER BRUSH RUN, RAYNE 30 TOWNSHIP, BRIDGE REPLACEMENT 239,000 20080S1503B2376 - 156 -
1 (BASE PROJECT ALLOCATION - $59,000) 2 (LAND ALLOCATION - $40,000) 3 (DESIGN AND CONTINGENCIES - $140,000) 4 (56) SR 1035 OVER TRIBUTARY OF DIXON RUN, 5 RAYNE TOWNSHIP, BRIDGE REPLACEMENT 236,000 6 (BASE PROJECT ALLOCATION - $56,000) 7 (LAND ALLOCATION - $40,000) 8 (DESIGN AND CONTINGENCIES - $140,000) 9 (57) SR 4008 OVER TRIBUTARY OF CROOKED 10 CREEK, RAYNE TOWNSHIP, BRIDGE 11 REPLACEMENT 220,000 12 (BASE PROJECT ALLOCATION - $150,000) 13 (DESIGN AND CONTINGENCIES - $70,000) 14 (58) SR 4012 OVER TRIBUTARY OF CROOKED 15 CREEK, RAYNE TOWNSHIP, BRIDGE 16 REPLACEMENT 221,000 17 (BASE PROJECT ALLOCATION - $41,000) 18 (LAND ALLOCATION - $40,000) 19 (DESIGN AND CONTINGENCIES - $140,000) 20 (59) SR 0286 OVER KISKIMINETAS RIVER, 21 SALTSBURG BOROUGH, BRIDGE 22 REHABILITATION 2,486,000 23 (BASE PROJECT ALLOCATION - $2,306,000) 24 (LAND ALLOCATION - $40,000) 25 (DESIGN AND CONTINGENCIES - $140,000) 26 (60) SR 4021 OVER CONDRON RUN, SMICKSBURG 27 BOROUGH, BRIDGE REPLACEMENT 342,000 28 (BASE PROJECT ALLOCATION - $162,000) 29 (LAND ALLOCATION - $40,000) 30 (DESIGN AND CONTINGENCIES - $140,000) 20080S1503B2376 - 157 -
1 (61) SR 0210 OVER ROSS RUN, SOUTH MAHONING 2 TOWNSHIP, BRIDGE REPLACEMENT 305,000 3 (BASE PROJECT ALLOCATION - $125,000) 4 (LAND ALLOCATION - $40,000) 5 (DESIGN AND CONTINGENCIES - $140,000) 6 (62) SR 0210, BRIDGE NO.19052 OVER 7 TRIBUTARY OF ROSS RUN, SOUTH MAHONING 8 TOWNSHIP, BRIDGE REPLACEMENT 251,000 9 (BASE PROJECT ALLOCATION - $71,000) 10 (LAND ALLOCATION - $40,000) 11 (DESIGN AND CONTINGENCIES - $140,000) 12 (63) SR 0210, BRIDGE NO.19053 OVER 13 TRIBUTARY OF ROSS RUN, SOUTH MAHONING 14 TOWNSHIP, BRIDGE REPLACEMENT 254,000 15 (BASE PROJECT ALLOCATION - $74,000) 16 (LAND ALLOCATION - $40,000) 17 (DESIGN AND CONTINGENCIES - $140,000) 18 (64) SR 0954 OVER NORTH BRANCH OF PLUM 19 CREEK, SOUTH MAHONING TOWNSHIP, BRIDGE 20 REPLACEMENT 235,000 21 (BASE PROJECT ALLOCATION - $55,000) 22 (LAND ALLOCATION - $40,000) 23 (DESIGN AND CONTINGENCIES - $140,000) 24 (65) SR 4015 OVER GOOSE RUN, SOUTH 25 MAHONING TOWNSHIP, BRIDGE REPLACEMENT 208,000 26 (BASE PROJECT ALLOCATION - $28,000) 27 (LAND ALLOCATION - $40,000) 28 (DESIGN AND CONTINGENCIES - $140,000) 29 (66) SR 4018 OVER LITTLE MAHONING CREEK, 30 SOUTH MAHONING TOWNSHIP, BRIDGE 20080S1503B2376 - 158 -
1 REPLACEMENT 677,000 2 (BASE PROJECT ALLOCATION - $497,000) 3 (LAND ALLOCATION - $40,000) 4 (DESIGN AND CONTINGENCIES - $140,000) 5 (67) SR 4001 OVER MUDLICK RUN, WASHINGTON 6 TOWNSHIP, BRIDGE REPLACEMENT 275,000 7 (BASE PROJECT ALLOCATION - $95,000) 8 (LAND ALLOCATION - $40,000) 9 (DESIGN AND CONTINGENCIES - $140,000) 10 (68) SR 0259 OVER WEST BRANCH OF RICHARDS 11 RUN, WEST WHEATFIELD TOWNSHIP, BRIDGE 12 REPLACEMENT 333,000 13 (BASE PROJECT ALLOCATION - $153,000) 14 (LAND ALLOCATION - $40,000) 15 (DESIGN AND CONTINGENCIES - $140,000) 16 (69) SR 0259, BRIDGE NO.19070 OVER RAMSEY 17 RUN, WEST WHEATFIELD TOWNSHIP, BRIDGE 18 REPLACEMENT 237,000 19 (BASE PROJECT ALLOCATION - $57,000) 20 (LAND ALLOCATION - $40,000) 21 (DESIGN AND CONTINGENCIES - $140,000) 22 (70) SR 0259, BRIDGE NO.19071 OVER RAMSEY 23 RUN, WEST WHEATFIELD TOWNSHIP, BRIDGE 24 REPLACEMENT 248,000 25 (BASE PROJECT ALLOCATION - $68,000) 26 (LAND ALLOCATION - $40,000) 27 (DESIGN AND CONTINGENCIES - $140,000) 28 (71) SR 2008 OVER RICHARDS RUN, WEST 29 WHEATFIELD TOWNSHIP, BRIDGE 30 REPLACEMENT 268,000 20080S1503B2376 - 159 -
1 (BASE PROJECT ALLOCATION - $88,000) 2 (LAND ALLOCATION - $40,000) 3 (DESIGN AND CONTINGENCIES - $140,000) 4 (72) SR 2011 OVER TRIBUTARY OF CONEMAUGH 5 RIVER, WEST WHEATFIELD TOWNSHIP, BRIDGE 6 REPLACEMENT 255,000 7 (BASE PROJECT ALLOCATION - $75,000) 8 (LAND ALLOCATION - $40,000) 9 (DESIGN AND CONTINGENCIES - $140,000) 10 (73) SR 0110 OVER MCKEE RUN, WHITE 11 TOWNSHIP, BRIDGE REPLACEMENT 278,000 12 (BASE PROJECT ALLOCATION - $98,000) 13 (LAND ALLOCATION - $40,000) 14 (DESIGN AND CONTINGENCIES - $140,000) 15 (74) SR 0954 OVER FULTON RUN, WHITE 16 TOWNSHIP, BRIDGE REPLACEMENT 249,000 17 (BASE PROJECT ALLOCATION - $69,000) 18 (LAND ALLOCATION - $40,000) 19 (DESIGN AND CONTINGENCIES - $140,000) 20 (75) SR 1002 OVER RAMSEY RUN, WHITE 21 TOWNSHIP, BRIDGE REPLACEMENT 339,000 22 (BASE PROJECT ALLOCATION - $159,000) 23 (LAND ALLOCATION - $40,000) 24 (DESIGN AND CONTINGENCIES - $140,000) 25 (76) SR 3024 OVER MCCARTHY RUN, WHITE 26 TOWNSHIP, BRIDGE REPLACEMENT 270,000 27 (BASE PROJECT ALLOCATION - $90,000) 28 (LAND ALLOCATION - $40,000) 29 (DESIGN AND CONTINGENCIES - $140,000) 30 (77) SR 4005 OVER TRIBUTARY OF MCKEE RUN, 20080S1503B2376 - 160 -
1 WHITE TOWNSHIP, BRIDGE REPLACEMENT 284,000 2 (BASE PROJECT ALLOCATION - $104,000) 3 (LAND ALLOCATION - $40,000) 4 (DESIGN AND CONTINGENCIES - $140,000) 5 (78) SR 4032 OVER TRIBUTARY OF MCCARTHY 6 RUN, WHITE TOWNSHIP, BRIDGE 7 REHABILITATION 1,077,000 8 (BASE PROJECT ALLOCATION - $427,000) 9 (LAND ALLOCATION - $150,000) 10 (DESIGN AND CONTINGENCIES - $500,000) 11 (79) SR 0286, BRIDGE NO.19087 OVER 12 BLACKLEGS CREEK, YOUNG TOWNSHIP, BRIDGE 13 REPLACEMENT 595,000 14 (BASE PROJECT ALLOCATION - $415,000) 15 (LAND ALLOCATION - $40,000) 16 (DESIGN AND CONTINGENCIES - $140,000) 17 (80) SR 3021 OVER HARPERS RUN, YOUNG 18 TOWNSHIP, BRIDGE REPLACEMENT 275,000 19 (BASE PROJECT ALLOCATION - $95,000) 20 (LAND ALLOCATION - $40,000) 21 (DESIGN AND CONTINGENCIES - $140,000) 22 (81) SR 3023 OVER WHISKY RUN, YOUNG 23 TOWNSHIP, BRIDGE REPLACEMENT 243,000 24 (BASE PROJECT ALLOCATION - $63,000) 25 (LAND ALLOCATION - $40,000) 26 (DESIGN AND CONTINGENCIES - $140,000) 27 (82) SR 3025 OVER NESBIT RUN, YOUNG 28 TOWNSHIP, BRIDGE REPLACEMENT 277,000 29 (BASE PROJECT ALLOCATION - $97,000) 30 (LAND ALLOCATION - $40,000) 20080S1503B2376 - 161 -
1 (DESIGN AND CONTINGENCIES - $140,000) 2 (83) SR 3029 OVER TRIBUTARY OF NEAL RUN, 3 YOUNG TOWNSHIP, BRIDGE REPLACEMENT 231,000 4 (BASE PROJECT ALLOCATION - $51,000) 5 (LAND ALLOCATION - $40,000) 6 (DESIGN AND CONTINGENCIES - $140,000) 7 (84) SR 3056 OVER TRIBUTARY OF BLACKLEGS 8 CREEK, YOUNG TOWNSHIP, BRIDGE 9 REPLACEMENT 228,000 10 (BASE PROJECT ALLOCATION - $48,000) 11 (LAND ALLOCATION - $40,000) 12 (DESIGN AND CONTINGENCIES - $140,000) 13 SECTION 37. JEFFERSON COUNTY. 14 (A) LOCAL BRIDGES (RESERVED) 15 (B) STATE BRIDGES 16 (1) SR 0036 OVER CANOE CREEK, BELL 17 TOWNSHIP, BRIDGE REPLACEMENT 513,000 18 (BASE PROJECT ALLOCATION - $333,000) 19 (LAND ALLOCATION - $40,000) 20 (DESIGN AND CONTINGENCIES - $140,000) 21 (2) SR 0119 OVER GRAFFIUS RUN, BELL 22 TOWNSHIP, BRIDGE REPLACEMENT 258,000 23 (BASE PROJECT ALLOCATION - $78,000) 24 (LAND ALLOCATION - $40,000) 25 (DESIGN AND CONTINGENCIES - $140,000) 26 (3) SR 2011 OVER TRIBUTARY OF CANOE CREEK, 27 BELL TOWNSHIP, BRIDGE REPLACEMENT 210,000 28 (BASE PROJECT ALLOCATION - $30,000) 29 (LAND ALLOCATION - $40,000) 30 (DESIGN AND CONTINGENCIES - $140,000) 20080S1503B2376 - 162 -
1 (4) SR 2003 OVER MAHONING CREEK, BIG RUN 2 BOROUGH, BRIDGE REPLACEMENT 770,000 3 (BASE PROJECT ALLOCATION - $590,000) 4 (LAND ALLOCATION - $40,000) 5 (DESIGN AND CONTINGENCIES - $140,000) 6 (5) SR 3003 OVER CODER RUN, CLOVER 7 TOWNSHIP, BRIDGE REPLACEMENT 285,000 8 (BASE PROJECT ALLOCATION - $105,000) 9 (LAND ALLOCATION - $40,000) 10 (DESIGN AND CONTINGENCIES - $140,000) 11 (6) SR 0949, BRIDGE NO.19666 OVER MILL 12 RUN, ELDRED TOWNSHIP, BRIDGE 13 REPLACEMENT 221,000 14 (BASE PROJECT ALLOCATION - $41,000) 15 (LAND ALLOCATION - $40,000) 16 (DESIGN AND CONTINGENCIES - $140,000) 17 (7) SR 0949, BRIDGE NO.19667 OVER MILL 18 RUN, ELDRED TOWNSHIP, BRIDGE 19 REPLACEMENT 228,000 20 (BASE PROJECT ALLOCATION - $48,000) 21 (LAND ALLOCATION - $40,000) 22 (DESIGN AND CONTINGENCIES - $140,000) 23 (8) SR 4006 OVER RED LICK RUN, ELDRED 24 TOWNSHIP, BRIDGE REHABILITATION 222,000 25 (BASE PROJECT ALLOCATION - $42,000) 26 (LAND ALLOCATION - $40,000) 27 (DESIGN AND CONTINGENCIES - $140,000) 28 (9) SR 2007 OVER LOST RUN, GASKILL 29 TOWNSHIP, BRIDGE REPLACEMENT 211,000 30 (BASE PROJECT ALLOCATION - $31,000) 20080S1503B2376 - 163 -
1 (LAND ALLOCATION - $40,000) 2 (DESIGN AND CONTINGENCIES - $140,000) 3 (10) SR 0949 OVER PINE RUN, HEATH 4 TOWNSHIP, BRIDGE REPLACEMENT 232,000 5 (BASE PROJECT ALLOCATION - $52,000) 6 (LAND ALLOCATION - $40,000) 7 (DESIGN AND CONTINGENCIES - $140,000) 8 (11) SR 0949 OVER CALLEN RUN, HEATH 9 TOWNSHIP, BRIDGE REPLACEMENT 290,000 10 (BASE PROJECT ALLOCATION - $110,000) 11 (LAND ALLOCATION - $40,000) 12 (DESIGN AND CONTINGENCIES - $140,000) 13 (12) SR 0410 OVER STUMP CREEK, HENDERSON 14 TOWNSHIP, BRIDGE REPLACEMENT 534,000 15 (BASE PROJECT ALLOCATION - $354,000) 16 (LAND ALLOCATION - $40,000) 17 (DESIGN AND CONTINGENCIES - $140,000) 18 (13) SR 2007 OVER MCKEE RUN, HENDERSON 19 TOWNSHIP, BRIDGE REPLACEMENT 235,000 20 (BASE PROJECT ALLOCATION - $150,000) 21 (LAND ALLOCATION - $15,000) 22 (DESIGN AND CONTINGENCIES - $70,000) 23 (14) SR 3039 OVER FIVE MILE RUN, KNOX 24 TOWNSHIP, BRIDGE REPLACEMENT 240,000 25 (BASE PROJECT ALLOCATION - $150,000) 26 (LAND ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $70,000) 28 (15) SR 3014 OVER BRANCH OF BIG RUN, 29 OLIVER TOWNSHIP, BRIDGE REPLACEMENT 251,000 30 (BASE PROJECT ALLOCATION - $71,000) 20080S1503B2376 - 164 -
1 (LAND ALLOCATION - $40,000) 2 (DESIGN AND CONTINGENCIES - $140,000) 3 (16) SR 3031 OVER BRANCH OF LITTLE SANDY 4 CREEK, OLIVER TOWNSHIP, BRIDGE 5 REPLACEMENT 227,000 6 (BASE PROJECT ALLOCATION - $47,000) 7 (LAND ALLOCATION - $40,000) 8 (DESIGN AND CONTINGENCIES - $140,000) 9 (17) SR 3008 OVER ROSE RUN, PERRY 10 TOWNSHIP, BRIDGE REPLACEMENT 382,000 11 (BASE PROJECT ALLOCATION - $202,000) 12 (LAND ALLOCATION - $40,000) 13 (DESIGN AND CONTINGENCIES - $140,000) 14 (18) SR 3013 OVER DUTCH RUN, PERRY 15 TOWNSHIP, BRIDGE REPLACEMENT 223,000 16 (BASE PROJECT ALLOCATION - $43,000) 17 (LAND ALLOCATION - $40,000) 18 (DESIGN AND CONTINGENCIES - $140,000) 19 (19) SR 4005 OVER HETRICK RUN, POLK 20 TOWNSHIP, BRIDGE REHABILITATION 215,000 21 (BASE PROJECT ALLOCATION - $35,000) 22 (LAND ALLOCATION - $40,000) 23 (DESIGN AND CONTINGENCIES - $140,000) 24 (20) LR 33001 OVER NYE BRANCH STREAM, 25 PORTER TOWNSHIP, BRIDGE REPLACEMENT 243,000 26 (BASE PROJECT ALLOCATION - $63,000) 27 (LAND ALLOCATION - $40,000) 28 (DESIGN AND CONTINGENCIES - $140,000) 29 (21) LR 33001 OVER PINE RUN, RINGGOLD 30 TOWNSHIP, BRIDGE REPLACEMENT 312,000 20080S1503B2376 - 165 -
1 (BASE PROJECT ALLOCATION - $132,000) 2 (LAND ALLOCATION - $40,000) 3 (DESIGN AND CONTINGENCIES - $140,000) 4 (22) LR 33003 OVER CHERRY RUN, RINGGOLD 5 TOWNSHIP, BRIDGE REPLACEMENT 264,000 6 (BASE PROJECT ALLOCATION - $84,000) 7 (LAND ALLOCATION - $40,000) 8 (DESIGN AND CONTINGENCIES - $140,000) 9 (23) SR 0536 OVER MILLIRON RUN, RINGGOLD 10 TOWNSHIP, BRIDGE REPLACEMENT 249,000 11 (BASE PROJECT ALLOCATION - $69,000) 12 (LAND ALLOCATION - $40,000) 13 (DESIGN AND CONTINGENCIES - $140,000) 14 (24) SR 0219 OVER TRIBUTARY OF LITTLE TOBY 15 CREEK, SNYDER TOWNSHIP, BRIDGE 16 REPLACEMENT 279,000 17 (BASE PROJECT ALLOCATION - $99,000) 18 (LAND ALLOCATION - $40,000) 19 (DESIGN AND CONTINGENCIES - $140,000) 20 (25) SR 1008 OVER TRIBUTARY OF RATTLESNAKE 21 CREEK, SNYDER TOWNSHIP, BRIDGE 22 REPLACEMENT 223,000 23 (BASE PROJECT ALLOCATION - $43,000) 24 (LAND ALLOCATION - $40,000) 25 (DESIGN AND CONTINGENCIES - $140,000) 26 (26) SR 0322 OVER TRIBUTARY OF CODER RUN, 27 UNION TOWNSHIP, BRIDGE REPLACEMENT 216,000 28 (BASE PROJECT ALLOCATION - $36,000) 29 (LAND ALLOCATION - $40,000) 30 (DESIGN AND CONTINGENCIES - $140,000) 20080S1503B2376 - 166 -
1 (27) SR 4001 OVER MILL CREEK, UNION 2 TOWNSHIP, BRIDGE REPLACEMENT 405,000 3 (BASE PROJECT ALLOCATION - $225,000) 4 (LAND ALLOCATION - $40,000) 5 (DESIGN AND CONTINGENCIES - $140,000) 6 (28) SR 0830 OVER BEAVERDAM RUN, 7 WASHINGTON TOWNSHIP, BRIDGE 8 REPLACEMENT 369,000 9 (BASE PROJECT ALLOCATION - $189,000) 10 (LAND ALLOCATION - $40,000) 11 (DESIGN AND CONTINGENCIES - $140,000) 12 (29) SR 0950 OVER TRIBUTARY TO SANDY LICK 13 CREEK, WINSLOW TOWNSHIP, BRIDGE 14 REPLACEMENT 240,000 15 (BASE PROJECT ALLOCATION - $60,000) 16 (LAND ALLOCATION - $40,000) 17 (DESIGN AND CONTINGENCIES - $140,000) 18 (30) SR 2007 OVER MCCREIGHT RUN, WINSLOW 19 TOWNSHIP, BRIDGE REPLACEMENT 239,000 20 (BASE PROJECT ALLOCATION - $59,000) 21 (LAND ALLOCATION - $40,000) 22 (DESIGN AND CONTINGENCIES - $140,000) 23 (31) SR 2010 OVER TROUT RUN, WINSLOW 24 TOWNSHIP, BRIDGE REHABILITATION 135,000 25 (BASE PROJECT ALLOCATION - $75,000) 26 (DESIGN AND CONTINGENCIES - $60,000) 27 (32) SR 3021 OVER SAWMILL RUN, YOUNG 28 TOWNSHIP, BRIDGE REPLACEMENT 245,000 29 (BASE PROJECT ALLOCATION - $65,000) 30 (LAND ALLOCATION - $40,000) 20080S1503B2376 - 167 -
1 (DESIGN AND CONTINGENCIES - $140,000) 2 SECTION 38. JUNIATA COUNTY. 3 (A) LOCAL BRIDGES (RESERVED) 4 (B) STATE BRIDGES 5 (1) SR 0035 OVER COCOLAMUS CREEK, FAYETTE 6 TOWNSHIP, BRIDGE REPLACEMENT 3,225,000 7 (BASE PROJECT ALLOCATION - $2,500,000) 8 (LAND ALLOCATION - $125,000) 9 (DESIGN AND CONTINGENCIES - $600,000) 10 (2) SR 2017 OVER DUTCHMAN RUN, GREENWOOD 11 TOWNSHIP, BRIDGE REHABILITATION 220,000 12 (BASE PROJECT ALLOCATION - $140,000) 13 (LAND ALLOCATION - $30,000) 14 (DESIGN AND CONTINGENCIES - $50,000) 15 (3) SR 0075 OVER TUSCARORA CREEK, LACK 16 TOWNSHIP, BRIDGE REPLACEMENT 1,600,000 17 (BASE PROJECT ALLOCATION - $1,000,000) 18 (LAND ALLOCATION - $300,000) 19 (DESIGN AND CONTINGENCIES - $300,000) 20 (4) SR 0035 OVER TRIBUTARY OF COCOLAMUS 21 CREEK, MONROE TOWNSHIP, BRIDGE 22 REPLACEMENT 1,475,000 23 (BASE PROJECT ALLOCATION - $850,000) 24 (LAND ALLOCATION - $125,000) 25 (DESIGN AND CONTINGENCIES - $500,000) 26 (5) SR 2022 OVER MAHANTANGO CREEK, MONROE 27 TOWNSHIP, BRIDGE REHABILITATION 1,150,000 28 (BASE PROJECT ALLOCATION - $600,000) 29 (LAND ALLOCATION - $100,000) 30 (DESIGN AND CONTINGENCIES - $450,000) 20080S1503B2376 - 168 -
1 (6) SR 2023 OVER DOBSON RUN, SUSQUEHANNA 2 TOWNSHIP, BRIDGE REPLACEMENT 275,000 3 (BASE PROJECT ALLOCATION - $200,000) 4 (DESIGN AND CONTINGENCIES - $75,000) 5 (7) SR 0333 OVER TRIBUTARY OF HUNTERS 6 CREEK, TURBETT TOWNSHIP, BRIDGE 7 REPLACEMENT 300,000 8 (BASE PROJECT ALLOCATION - $200,000) 9 (DESIGN AND CONTINGENCIES - $100,000) 10 (8) SR 3018 OVER UNION RUN, TUSCARORA 11 TOWNSHIP, BRIDGE REPLACEMENT 250,000 12 (BASE PROJECT ALLOCATION - $150,000) 13 (LAND ALLOCATION - $100,000) 14 SECTION 39. LACKAWANNA COUNTY. 15 LOCAL BRIDGES 16 (1) CITY OF SCRANTON, PARKER STREET OVER 17 LACKAWANNA RIVER, BRIDGE REPLACEMENT 313,000 18 (BASE PROJECT ALLOCATION - $184,000) 19 (DESIGN AND CONTINGENCIES - $129,000) 20 (2) MOOSIC BOROUGH, COUNTY-OWNED RAILROAD 21 OVER SPRING BROOK CREEK, BRIDGE 22 REHABILITATION 385,000 23 (BASE PROJECT ALLOCATION - $350,000) 24 (DESIGN AND CONTINGENCIES - $35,000) 25 (3) MOOSIC BOROUGH, COUNTY-OWNED RAILROAD 26 OVER ROUTE 502, BRIDGE REHABILITATION 60,000 27 (BASE PROJECT ALLOCATION - $54,000) 28 (DESIGN AND CONTINGENCIES - $6,000) 29 (B) STATE BRIDGES 30 (1) SR 0435 OVER VAN BRUNT CREEK, MOSCOW 20080S1503B2376 - 169 -
1 BOROUGH, BRIDGE REHABILITATION 121,000 2 (BASE PROJECT ALLOCATION - $83,000) 3 (LAND ALLOCATION - $9,000) 4 (DESIGN AND CONTINGENCIES - $29,000) 5 (2) VARIOUS ROUTES OVER LACKAWANNA AND 6 LUZERNE COUNTIES, VARIOUS TOWNSHIPS, 7 BRIDGE REHABILITATION 10,080,000 8 (BASE PROJECT ALLOCATION - $8,000,000) 9 (DESIGN AND CONTINGENCIES - $2,080,000) 10 SECTION 40. LANCASTER COUNTY. 11 (A) LOCAL BRIDGES (RESERVED) 12 (B) STATE BRIDGES 13 (1) SR 2014 OVER BALL RUN, COLERAIN 14 TOWNSHIP, BRIDGE REPLACEMENT 1,046,000 15 (BASE PROJECT ALLOCATION - $719,000) 16 (LAND ALLOCATION - $40,000) 17 (DESIGN AND CONTINGENCIES - $287,000) 18 (2) US 222 NORTHBOUND OVER SR 1051, CHURCH 19 STREET, EAST COCALICO TOWNSHIP, BRIDGE 20 REHABILITATION 4,340,000 21 (BASE PROJECT ALLOCATION - $2,065,000) 22 (DESIGN AND CONTINGENCIES - $2,275,000) 23 (3) US 222 SOUTHBOUND OVER SR 1051, CHURCH 24 STREET, EAST COCALICO TOWNSHIP, BRIDGE 25 REHABILITATION 4,340,000 26 (BASE PROJECT ALLOCATION - $2,065,000) 27 (DESIGN AND CONTINGENCIES - $2,275,000) 28 (4) SR 4017, BRIDGE NO.21711 OVER WET 29 WEATHER STREAM, EAST DONEGAL TOWNSHIP, 30 BRIDGE REPLACEMENT 100,000 20080S1503B2376 - 170 -
1 (BASE PROJECT ALLOCATION - $100,000) 2 (5) PA 896 OVER MILL CREEK, EAST LAMPETER 3 TOWNSHIP, BRIDGE REHABILITATION 2,515,000 4 (BASE PROJECT ALLOCATION - $1,115,000) 5 (DESIGN AND CONTINGENCIES - $140,000) 6 (6) SR 3028, PITNEY ROAD OVER AMTRAK, EAST 7 LAMPETER TOWNSHIP, BRIDGE 8 REHABILITATION 1,500,000 9 (BASE PROJECT ALLOCATION - $1,500,000) 10 (7) SR 1026 OVER SEELOCK RUN, ELIZABETH 11 TOWNSHIP, BRIDGE REPLACEMENT 930,000 12 (BASE PROJECT ALLOCATION - $600,000) 13 (LAND ALLOCATION - $40,000) 14 (DESIGN AND CONTINGENCIES - $290,000) 15 (8) SR 0272, NORTH READING ROAD OVER 16 COCALICO CREEK, EPHRATA BOROUGH, BRIDGE 17 REPLACEMENT 2,630,000 18 (BASE PROJECT ALLOCATION - $2,500,000) 19 (LAND ALLOCATION - $30,000) 20 (DESIGN AND CONTINGENCIES - $100,000) 21 (9) SR 1039, MEADOW VALLEY OVER HAMMER 22 CREEK, EPHRATA TOWNSHIP, BRIDGE 23 REHABILITATION 1,000,000 24 (BASE PROJECT ALLOCATION - $1,000,000) 25 (10) SR 0272, NORTH READING DRIVE OVER 26 ABANDONED NORFOLK SOUTHERN RAILROAD, 27 EPHRATA TOWNSHIP, BRIDGE REMOVAL 1,000,000 28 (BASE PROJECT ALLOCATION - $1,000,000) 29 (11) SR 0743, HERSHEY ROAD OVER CONEWAGO 30 CREEK, MT. JOY TOWNSHIP, BRIDGE 20080S1503B2376 - 171 -
1 REPLACEMENT 730,000 2 (BASE PROJECT ALLOCATION - $200,000) 3 (LAND ALLOCATION - $30,000) 4 (DESIGN AND CONTINGENCIES - $500,000) 5 (12) SR 3022 OVER TRIBUTARY OF STEHMAN 6 RUN, PEQUEA TOWNSHIP, BRIDGE 7 REPLACEMENT 100,000 8 (BASE PROJECT ALLOCATION - $100,000) 9 (13) SR 4033, MEADOWVIEW ROAD OVER 10 BRUBAKER RUN, RAPHO TOWNSHIP, BRIDGE 11 REHABILITATION 430,000 12 (BASE PROJECT ALLOCATION - $300,000) 13 (LAND ALLOCATION - $30,000) 14 (DESIGN AND CONTINGENCIES - $100,000) 15 (14) SR 4027 OVER TRIBUTARY OF BRUBAKERS 16 RUN, RAPHO TOWNSHIP, BRIDGE 17 REPLACEMENT 948,000 18 (BASE PROJECT ALLOCATION - $600,000) 19 (LAND ALLOCATION - $40,000) 20 (DESIGN AND CONTINGENCIES - $308,000) 21 (15) SR 2022 OVER TRIBUTARY OF BEAVER 22 CREEK, STRASBURG TOWNSHIP, BRIDGE 23 REPLACEMENT 665,000 24 (BASE PROJECT ALLOCATION - $400,000) 25 (LAND ALLOCATION - $40,000) 26 (DESIGN AND CONTINGENCIES - $225,000) 27 (16) SR 1039, BRIAR HILL OVER TRIBUTARY OF 28 HAMMER CREEK, WARWICK TOWNSHIP, BRIDGE 29 REPLACEMENT 100,000 30 (BASE PROJECT ALLOCATION - $100,000) 20080S1503B2376 - 172 -
1 (17) SR 0222, BEAVER VALLEY PIKE OVER BIG 2 SPRING RUN, WEST LAMPETER TOWNSHIP, 3 BRIDGE REPLACEMENT 2,500,000 4 (BASE PROJECT ALLOCATION - $2,500,000) 5 SECTION 41. LAWRENCE COUNTY. 6 (A) LOCAL BRIDGES (RESERVED) 7 (B) STATE BRIDGES 8 (1) SR 0317, EAST POLAND AVENUE OVER 9 HICKORY RUN, BESSEMER BOROUGH, BRIDGE 10 REHABILITATION 233,000 11 (BASE PROJECT ALLOCATION - $213,000) 12 (DESIGN AND CONTINGENCIES - $20,000) 13 (2) SR 0018, FRANKFORT ROAD OVER BIG RUN, 14 CITY OF NEW CASTLE, BRIDGE REPLACEMENT 256,000 15 (BASE PROJECT ALLOCATION - $200,000) 16 (LAND ALLOCATION - $15,000) 17 (DESIGN AND CONTINGENCIES - $41,000) 18 (3) SR 0018, LIBERTY STREET OVER MAHONING 19 RIVER, CITY OF NEW CASTLE, BRIDGE 20 REHABILITATION 2,177,000 21 (BASE PROJECT ALLOCATION - $1,925,000) 22 (LAND ALLOCATION - $7,000) 23 (DESIGN AND CONTINGENCIES - $245,000) 24 (4) SR 0065, SECOND STREET OVER BUFFALO 25 AND PITTSBURGH RAILROAD, ELLWOOD CITY 26 BOROUGH, BRIDGE REPLACEMENT 387,000 27 (BASE PROJECT ALLOCATION - $300,000) 28 (LAND ALLOCATION - $15,000) 29 (DESIGN AND CONTINGENCIES - $72,000) 30 (5) SR 0168, EASTBROOK ROAD OVER SMALL 20080S1503B2376 - 173 -
1 STREAM, HICKORY TOWNSHIP, BRIDGE 2 REHABILITATION 601,000 3 (BASE PROJECT ALLOCATION - $200,000) 4 (LAND ALLOCATION - $63,000) 5 (DESIGN AND CONTINGENCIES - $338,000) 6 (6) SR 1002, MAITLAND LANE OVER NESHANNOCK 7 CREEK, HICKORY TOWNSHIP, BRIDGE 8 REHABILITATION 280,000 9 (BASE PROJECT ALLOCATION - $200,000) 10 (LAND ALLOCATION - $40,000) 11 (DESIGN AND CONTINGENCIES - $40,000) 12 (7) SR 0551, MAIN STREET OVER LITTLE 13 BEAVER CREEK, LITTLE BEAVER TOWNSHIP, 14 BRIDGE REPLACEMENT 387,000 15 (BASE PROJECT ALLOCATION - $300,000) 16 (LAND ALLOCATION - $15,000) 17 (DESIGN AND CONTINGENCIES - $72,000) 18 (8) SR 0351, PETERSBURG ROAD OVER NORTH 19 FORK LITTLE BEAVER, LITTLE BEAVER 20 TOWNSHIP, BRIDGE REPLACEMENT 256,000 21 (BASE PROJECT ALLOCATION - $200,000) 22 (LAND ALLOCATION - $15,000) 23 (DESIGN AND CONTINGENCIES - $41,000) 24 (9) SR 3011 OVER NORTH FORK LITTLE BEAVER, 25 LITTLE BEAVER TOWNSHIP, BRIDGE 26 REHABILITATION 150,000 27 (BASE PROJECT ALLOCATION - $120,000) 28 (LAND ALLOCATION - $10,000) 29 (DESIGN AND CONTINGENCIES - $20,000) 30 (10) SR 4006, SKY HILL ROAD OVER COFFEE 20080S1503B2376 - 174 -
1 RUN, MAHONING TOWNSHIP, BRIDGE 2 REPLACEMENT 387,000 3 (BASE PROJECT ALLOCATION - $300,000) 4 (LAND ALLOCATION - $15,000) 5 (DESIGN AND CONTINGENCIES - $72,000) 6 (11) SR 4005, PULASKI ROAD OVER CAMP RUN, 7 NESHANNOCK TOWNSHIP, BRIDGE 8 REHABILITATION 233,000 9 (BASE PROJECT ALLOCATION - $213,000) 10 (DESIGN AND CONTINGENCIES - $20,000) 11 (12) SR 0551 OVER DEER CREEK, PULASKI 12 TOWNSHIP, BRIDGE REPLACEMENT 387,000 13 (BASE PROJECT ALLOCATION - $300,000) 14 (LAND ALLOCATION - $15,000) 15 (DESIGN AND CONTINGENCIES - $72,000) 16 (13) SR 0108, CRONTON AVENUE OVER TAYLOR 17 RUN, SCOTT TOWNSHIP, BRIDGE 18 REPLACEMENT 256,000 19 (BASE PROJECT ALLOCATION - $200,000) 20 (LAND ALLOCATION - $15,000) 21 (DESIGN AND CONTINGENCIES - $41,000) 22 (14) SR 0388, STATE ROAD OVER BIG RUN, 23 SHENANGO TOWNSHIP, BRIDGE 24 REHABILITATION 233,000 25 (BASE PROJECT ALLOCATION - $213,000) 26 (DESIGN AND CONTINGENCIES - $20,000) 27 (15) SR 2028, HELLS HOLLOW OVER HELL RUN, 28 SLIPPERY ROCK TOWNSHIP, BRIDGE 29 REHABILITATION 233,000 30 (BASE PROJECT ALLOCATION - $213,000) 20080S1503B2376 - 175 -
1 (DESIGN AND CONTINGENCIES - $20,000) 2 (16) SR 0208, MARKET STREET OVER 3 NESHANNOCK CREEK, WAMPUM BOROUGH, 4 BRIDGE REHABILITATION 1,632,000 5 (BASE PROJECT ALLOCATION - $1,442,000) 6 (LAND ALLOCATION - $6,000) 7 (DESIGN AND CONTINGENCIES - $184,000) 8 (17) SR 0288, MAIN STREET OVER TRIBUTARY 9 OF BEAVER RIVER, WAYNE TOWNSHIP, BRIDGE 10 REHABILITATION 601,000 11 (BASE PROJECT ALLOCATION - $200,000) 12 (LAND ALLOCATION - $63,000) 13 (DESIGN AND CONTINGENCIES - $338,000) 14 (18) SR 2005 OVER SLIPPERY ROCK CREEK, 15 WAYNE TOWNSHIP, BRIDGE REPLACEMENT 3,500,000 16 (BASE PROJECT ALLOCATION - $3,500,000) 17 SECTION 42. LEBANON COUNTY. 18 (A) LOCAL BRIDGES (RESERVED) 19 (B) STATE BRIDGES 20 (1) SR 0422, US 422 OVER STORM DRAIN, 21 ANNVILLE TOWNSHIP, BRIDGE REPLACEMENT 849,000 22 (BASE PROJECT ALLOCATION - $599,000) 23 (LAND ALLOCATION - $50,000) 24 (DESIGN AND CONTINGENCIES - $200,000) 25 (2) US 322 OVER RAILROAD (REMOVED), 26 CORNWALL BOROUGH, BRIDGE 27 REHABILITATION 370,000 28 (BASE PROJECT ALLOCATION - $300,000) 29 (LAND ALLOCATION - $20,000) 30 (DESIGN AND CONTINGENCIES - $50,000) 20080S1503B2376 - 176 -
1 (3) US 322 OVER SR 0117, ABANDONED 2 RAILROAD, CORNWALL BOROUGH, BRIDGE 3 REHABILITATION 370,000 4 (BASE PROJECT ALLOCATION - $300,000) 5 (LAND ALLOCATION - $20,000) 6 (DESIGN AND CONTINGENCIES - $50,000) 7 (4) SR 0443, ASHER MINER OVER INDIANTOWN 8 RUN, EAST HANOVER TOWNSHIP, BRIDGE 9 REPLACEMENT 420,000 10 (BASE PROJECT ALLOCATION - $300,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $100,000) 13 (5) SR 4018, BOUNDARY ROAD OVER INDIANTOWN 14 RUN, EAST HANOVER TOWNSHIP, BRIDGE 15 REHABILITATION 750,000 16 (BASE PROJECT ALLOCATION - $750,000) 17 (6) SR 0443, CLEMENT AVENUE OVER 18 INDIANTOWN RUN, EAST HANOVER TOWNSHIP, 19 BRIDGE REPLACEMENT 270,000 20 (BASE PROJECT ALLOCATION - $140,000) 21 (LAND ALLOCATION - $30,000) 22 (DESIGN AND CONTINGENCIES - $100,000) 23 (7) SR 4011 OVER TRIBUTARY OF SWATARA 24 CREEK, NORTH LONDONDERRY TOWNSHIP, 25 BRIDGE REPLACEMENT 821,000 26 (BASE PROJECT ALLOCATION - $600,000) 27 (LAND ALLOCATION - $45,000) 28 (DESIGN AND CONTINGENCIES - $176,000) 29 (8) PA 341 OVER LITTLE CONEWAGO CREEK, 30 SOUTH LONDONDERRY TOWNSHIP, BRIDGE 20080S1503B2376 - 177 -
1 REPLACEMENT 420,000 2 (BASE PROJECT ALLOCATION - $300,000) 3 (LAND ALLOCATION - $20,000) 4 (DESIGN AND CONTINGENCIES - $100,000) 5 (9) SR 1020, LICKDALE ROAD OVER OIL RUN, 6 SWATARA TOWNSHIP, BRIDGE 7 REHABILITATION 1,660,000 8 (BASE PROJECT ALLOCATION - $960,000) 9 (DESIGN AND CONTINGENCIES - $700,000) 10 (10) SR 4022, CLEMENT AVENUE OVER 11 TRIBUTARY OF INDIANTOWN RUN, UNION 12 TOWNSHIP, BRIDGE REPLACEMENT 950,000 13 (BASE PROJECT ALLOCATION - $950,000) 14 (11) SR 4020, FISHER AVENUE OVER TRIBUTARY 15 OF SWATARA CREEK, UNION TOWNSHIP, 16 BRIDGE REPLACEMENT 950,000 17 (BASE PROJECT ALLOCATION - $950,000) 18 SECTION 43. LEHIGH COUNTY. 19 (A) LOCAL BRIDGES (RESERVED) 20 (B) STATE BRIDGES 21 (1) SR 1002, TILGHMAN STREET OVER LEHIGH 22 RIVER CORMAN RIVER, CITY ALLENTOWN, 23 BRIDGE REHABILITATION 1,450,000 24 (BASE PROJECT ALLOCATION - $700,000) 25 (LAND ALLOCATION - $75,000) 26 (DESIGN AND CONTINGENCIES - $675,000) 27 (2) SR 4009, NEWSIDE ROAD OVER MILL CREEK, 28 HEIDELBERG TOWNSHIP, BRIDGE 29 REHABILITATION 324,000 30 (BASE PROJECT ALLOCATION - $114,000) 20080S1503B2376 - 178 -
1 (LAND ALLOCATION - $50,000) 2 (DESIGN AND CONTINGENCIES - $160,000) 3 (3) SR 4007 OVER JORDAN CREEK, NORTH 4 WHITEHALL TOWNSHIP, BRIDGE 5 REHABILITATION 2,900,000 6 (BASE PROJECT ALLOCATION - $1,400,000) 7 (LAND ALLOCATION - $250,000) 8 (DESIGN AND CONTINGENCIES - $1,250,000) 9 SECTION 44. LUZERNE COUNTY. 10 (A) LOCAL BRIDGES 11 (1) FAIRMOUNT TOWNSHIP, T-654 OVER KITCHEN 12 CREEK, BRIDGE REPLACEMENT 630,000 13 (BASE PROJECT ALLOCATION - $630,000) 14 (2) NEW COLOMBUS BOROUGH, T-486 OVER 15 LITTLE PINE CREEK, BRIDGE REPLACEMENT 430,000 16 (BASE PROJECT ALLOCATION - $430,000) 17 (3) LEHMAN TOWNSHIP, T-581 OVER PIKES 18 CREEK, BRIDGE REPLACEMENT 630,000 19 (BASE PROJECT ALLOCATION - $630,000) 20 (4) EXETER TOWNSHIP, COUNTY ROAD NO.10 21 OVER SUTTON CREEK, BRIDGE REPLACEMENT 630,000 22 (BASE PROJECT ALLOCATION - $630,000) 23 (5) EXETER TOWNSHIP, COUNTY ROAD NO.10 24 OVER SUTTON CREEK, BRIDGE REPLACEMENT 630,000 25 (BASE PROJECT ALLOCATION - $630,000) 26 (6) RICE TOWNSHIP, COUNTY ROAD NO.23 OVER 27 WAPWALLOPEN CREEK, BRIDGE REPLACEMENT 630,000 28 (BASE PROJECT ALLOCATION - $630,000) 29 (7) NESCOPECK TOWNSHIP, T-376 OVER 30 NESCOPECK CREEK, BRIDGE REPLACEMENT 630,000 20080S1503B2376 - 179 -
1 (BASE PROJECT ALLOCATION - $630,000) 2 (8) SALEM TOWNSHIP, T-436 OVER BEACH HAVEN 3 CREEK, BRIDGE REPLACEMENT 630,000 4 (BASE PROJECT ALLOCATION - $630,000) 5 (9) SHICKSHINNY BOROUGH, GLEN AVENUE OVER 6 SHICKSHINNY CREEK, BRIDGE REPLACEMENT 150,000 7 (BASE PROJECT ALLOCATION - $150,000) 8 (10) SHICKSHINNY BOROUGH, BARTOLI LANE 9 OVER SHICKSHINNY CREEK, BRIDGE 10 REPLACEMENT 150,000 11 (BASE PROJECT ALLOCATION - $150,000) 12 (11) AVOCA BOROUGH, COUNTY-OWNED RAILROAD 13 OVER MCALPINE STREET, BRIDGE 14 REHABILITATION 50,000 15 (BASE PROJECT ALLOCATION - $45,000) 16 (DESIGN AND CONTINGENCIES - $5,000) 17 (12) AVOCA BOROUGH, COUNTY-OWNED RAILROAD 18 OVER C.P. RAILROAD, BRIDGE 19 REHABILITATION 63,000 20 (BASE PROJECT ALLOCATION - $57,000) 21 (DESIGN AND CONTINGENCIES - $6,000) 22 (13) AVOCA BOROUGH, COUNTY-OWNED RAILROAD 23 OVER R.B.M.N. RAILROAD, BRIDGE 24 REHABILITATION 66,000 25 (BASE PROJECT ALLOCATION - $60,000) 26 (DESIGN AND CONTINGENCIES - $6,000) 27 (14) AVOCA BOROUGH, COUNTY-OWNED RAILROAD 28 OVER YORK AVENUE, BRIDGE 29 REHABILITATION 55,000 30 (BASE PROJECT ALLOCATION - $50,000) 20080S1503B2376 - 180 -
1 (DESIGN AND CONTINGENCIES - $5,000) 2 (15) AVOCA BOROUGH, COUNTY-OWNED RAILROAD 3 OVER KERR MCGEE, BRIDGE REHABILITATION 22,000 4 (BASE PROJECT ALLOCATION - $20,000) 5 (DESIGN AND CONTINGENCIES - $2,000) 6 (16) CITY OF WILKES-BARRE, COUNTY-OWNED 7 RAILROAD OVER LAUREL RUN CREEK, BRIDGE 8 REHABILITATION 110,000 9 (BASE PROJECT ALLOCATION - $100,000) 10 (DESIGN AND CONTINGENCIES - $10,000) 11 (17) ASHLEY BOROUGH, COUNTY-OWNED RAILROAD 12 OVER ASHLEY STREET, BRIDGE 13 REHABILITATION 61,000 14 (BASE PROJECT ALLOCATION - $55,000) 15 (DESIGN AND CONTINGENCIES - $6,000) 16 (18) ASHLEY BOROUGH, COUNTY-OWNED RAILROAD 17 OVER CEMETERY STREET, BRIDGE 18 DEMOLITION 132,000 19 (BASE PROJECT ALLOCATION - $120,000) 20 (DESIGN AND CONTINGENCIES - $12,000) 21 (19) ASHLEY BOROUGH, COUNTY-OWNED RAILROAD 22 OVER CAREY STREET, BRIDGE DEMOLITION 55,000 23 (BASE PROJECT ALLOCATION - $50,000) 24 (DESIGN AND CONTINGENCIES - $5,000) 25 (20) CITY OF PITTSTON, COUNTY-OWNED 26 RAILROAD OVER SUSQUEHANNA RIVER, BRIDGE 27 REHABILITATION 550,000 28 (BASE PROJECT ALLOCATION - $500,000) 29 (DESIGN AND CONTINGENCIES - $50,000) 30 (21) CITY OF WILKES-BARRE, COUNTY-OWNED 20080S1503B2376 - 181 -
1 RAILROAD OVER MILL CREEK, BRIDGE 2 REHABILITATION 34,000 3 (BASE PROJECT ALLOCATION - $30,000) 4 (DESIGN AND CONTINGENCIES - $4,000) 5 (22) CITY OF WILKES-BARRE, COUNTY-OWNED 6 RAILROAD OVER SCOTT STREET, BRIDGE 7 REHABILITATION 165,000 8 (BASE PROJECT ALLOCATION - $150,000) 9 (DESIGN AND CONTINGENCIES - $15,000) 10 (23) CITY OF WILKES-BARRE, COUNTY-OWNED 11 RAILROAD OVER SHELBOURNE STREET, BRIDGE 12 REHABILITATION 39,000 13 (BASE PROJECT ALLOCATION - $35,000) 14 (DESIGN AND CONTINGENCIES - $4,000) 15 (24) PITTSTON TOWNSHIP, COUNTY-OWNED 16 RAILROAD OVER SUSCON ROAD, NEW BRIDGE 17 CONSTRUCTION 2,750,000 18 (BASE PROJECT ALLOCATION - $2,500,000) 19 (DESIGN AND CONTINGENCIES - $250,000) 20 (25) PITTSTON TOWNSHIP, COUNTY-OWNED 21 RAILROAD OVER SUSCON MILL CREEK, BRIDGE 22 REHABILITATION 22,000 23 (BASE PROJECT ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $2,000) 25 (26) WYCOMING BOROUGH, COUNTY-OWNED 26 RAILROAD OVER ABRAHAMS CREEK, BRIDGE 27 REHABILITATION 22,000 28 (BASE PROJECT ALLOCATION - $20,000) 29 (DESIGN AND CONTINGENCIES - $2,000) 30 (27) EXETER BOROUGH, COUNTY-OWNED RAILROAD 20080S1503B2376 - 182 -
1 OVER STEPHENS ROAD, BRIDGE 2 REHABILITATION 22,000 3 (BASE PROJECT ALLOCATION - $20,000) 4 (DESIGN AND CONTINGENCIES - $2,000) 5 (28) CITY OF WILKES-BARRE, COUNTY-OWNED 6 RAILROAD OVER LAUREL RUN CREEK, BRIDGE 7 REHABILITATION 11,000 8 (BASE PROJECT ALLOCATION - $10,000) 9 (DESIGN AND CONTINGENCIES - $1,000) 10 (29) CITY OF WILKES-BARRE, COUNTY-OWNED 11 RAILROAD OVER THOMAS STREET, BRIDGE 12 REHABILITATION 22,000 13 (BASE PROJECT ALLOCATION - $20,000) 14 (DESIGN AND CONTINGENCIES - $2,000) 15 (30) CITY OF WILKES-BARRE, COUNTY-OWNED 16 RAILROAD OVER MAYOCK STREET, BRIDGE 17 REHABILITATION 44,000 18 (BASE PROJECT ALLOCATION - $40,000) 19 (DESIGN AND CONTINGENCIES - $4,000) 20 (31) LEHMAN TOWNSHIP, T-581 OVER PIKES 21 CREEK, BRIDGE REPLACEMENT 660,000 22 (BASE PROJECT ALLOCATION - $630,000) 23 (LAND ALLOCATION - $30,000) 24 (32) FAIRMOUNT TOWNSHIP, T-654 OVER 25 KITCHEN CREEK, BRIDGE REPLACEMENT 660,000 26 (BASE PROJECT ALLOCATION - $630,000) 27 (LAND ALLOCATION - $30,000) 28 (33) CITY OF WILKES-BARRE/HANOVER 29 TOWNSHIP, DIVISION STREET OVER SOLOMON 30 CREEK, BRIDGE REPLACEMENT 660,000 20080S1503B2376 - 183 -
1 (BASE PROJECT ALLOCATION - $630,000) 2 (LAND ALLOCATION - $30,000) 3 (34) HANOVER TOWNSHIP, WEST LIBERTY STREET 4 OVER SOLOMON CREEK, BRIDGE REPLACEMENT 660,000 5 (BASE PROJECT ALLOCATION - $630,000) 6 (LAND ALLOCATION - $30,000) 7 (35) EXETER TOWNSHIP, COUNTY ROAD NO.10 8 OVER SUTTON CREEK, BRIDGE REPLACEMENT 660,000 9 (BASE PROJECT ALLOCATION - $630,000) 10 (LAND ALLOCATION - $30,000) 11 (36) EXETER TOWNSHIP, COUNTY ROAD NO.10 12 OVER SUTTON CREEK, BRIDGE REPLACEMENT 660,000 13 (BASE PROJECT ALLOCATION - $630,000) 14 (LAND ALLOCATION - $30,000) 15 (37) RICE TOWNSHIP, COUNTY ROAD NO.23 OVER 16 WAPWALLOPEN CREEK, BRIDGE REPLACEMENT 660,000 17 (BASE PROJECT ALLOCATION - $630,000) 18 (LAND ALLOCATION - $60,000) 19 (38) NEW COLUMBUS BOROUGH, T-486 OVER 20 LITTLE PINE CREEK, BRIDGE REPLACEMENT 460,000 21 (BASE PROJECT ALLOCATION - $430,000) 22 (LAND ALLOCATION - $30,000) 23 (39) NESCOPECK TOWNSHIP, T-376 OVER 24 NESCOPECK CREEK, BRIDGE REPLACEMENT 660,000 25 (BASE PROJECT ALLOCATION - $630,000) 26 (LAND ALLOCATION - $30,000) 27 (40) SALEM TOWNSHIP, T-436 OVER BEACH 28 HAVEN CREEK, BRIDGE REPLACEMENT 660,000 29 (BASE PROJECT ALLOCATION - $630,000) 30 (LAND ALLOCATION - $30,000) 20080S1503B2376 - 184 -
1 (41) BLACK CREEK TOWNSHIP, T-514 OVER 2 BLACK CREEK, BRIDGE REPLACEMENT 660,000 3 (BASE PROJECT ALLOCATION - $630,000) 4 (LAND ALLOCATION - $30,000) 5 (42) BUTLER TOWNSHIP, COUNTY ROAD NO.39 6 OVER NESCOPECK CREEK, BRIDGE 7 REPLACEMENT 660,000 8 (BASE PROJECT ALLOCATION - $630,000) 9 (LAND ALLOCATION - $30,000) 10 (43) BUTLER TOWNSHIP, T-356 OVER NESCOPECK 11 CREEK, BRIDGE REPLACEMENT 660,000 12 (BASE PROJECT ALLOCATION - $630,000) 13 (LAND ALLOCATION - $30,000) 14 (44) SUGARLOAF TOWNSHIP, T-342 OVER 15 NESCOPECK CREEK, BRIDGE REPLACEMENT 660,000 16 (BASE PROJECT ALLOCATION - $630,000) 17 (LAND ALLOCATION - $30,000) 18 (B) STATE BRIDGES 19 (1) SR 3010 OVER BRANCH OF WAPWALLOPEN 20 CREEK, DORRANCE TOWNSHIP, BRIDGE 21 REHABILITATION 41,000 22 (BASE PROJECT ALLOCATION - $28,000) 23 (LAND ALLOCATION - $3,000) 24 (DESIGN AND CONTINGENCIES - $10,000) 25 (2) SR 4020 OVER PINE CREEK, FAIRMOUNT 26 TOWNSHIP, BRIDGE REHABILITATION 154,000 27 (BASE PROJECT ALLOCATION - $106,000) 28 (LAND ALLOCATION - $11,000) 29 (DESIGN AND CONTINGENCIES - $37,000) 30 (3) SR 0011 OVER ABRAHAMS CREEK, FORTY 20080S1503B2376 - 185 -
1 FORT BOROUGH, BRIDGE REHABILITATION 442,000 2 (BASE PROJECT ALLOCATION - $304,000) 3 (LAND ALLOCATION - $30,000) 4 (DESIGN AND CONTINGENCIES - $108,000) 5 (4) SR 4005 OVER HUNLOCK CREEK, HUNLOCK 6 TOWNSHIP, BRIDGE REPLACEMENT 70,000 7 (BASE PROJECT ALLOCATION - $48,000) 8 (LAND ALLOCATION - $5,000) 9 (DESIGN AND CONTINGENCIES - $17,000) 10 (5) SR 4010 OVER HUNTINGTON CREEK, 11 HUNTINGTON TOWNSHIP, BRIDGE 12 REHABILITATION 250,000 13 (BASE PROJECT ALLOCATION - $173,000) 14 (LAND ALLOCATION - $17,000) 15 (DESIGN AND CONTINGENCIES - $60,000) 16 (6) SR 1012 OVER BRANCH OF HARVEY'S CREEK, 17 JACKSON TOWNSHIP, BRIDGE REPLACEMENT 635,000 18 (BASE PROJECT ALLOCATION - $500,000) 19 (LAND ALLOCATION - $35,000) 20 (DESIGN AND CONTINGENCIES - $100,000) 21 (7) SR 4037 OVER STONE CHURCH HOLLOW 22 CREEK, SALEM TOWNSHIP, BRIDGE 23 REHABILITATION 110,000 24 (BASE PROJECT ALLOCATION - $76,000) 25 (LAND ALLOCATION - $8,000) 26 (DESIGN AND CONTINGENCIES - $26,000) 27 (8) SR 0080, EAST BOUND OVER LINESVILLE 28 CREEK, WHITE HAVEN BOROUGH, BRIDGE 29 REHABILITATION 52,000 30 (BASE PROJECT ALLOCATION - $35,000) 20080S1503B2376 - 186 -
1 (LAND ALLOCATION - $4,000) 2 (DESIGN AND CONTINGENCIES - $13,000) 3 (9) SR 2032, NEAR INTERSECTION OF SR 2030, 4 OVER ABANDONED RAILROAD, DURYEA AND 5 HUGHESTOWN BOROUGHS, RAILROAD ABUTMENTS 6 REMOVAL 18,000 7 (BASE PROJECT ALLOCATION - $18,000) 8 (10) SR 2029, YORK AVENUE NEAR 9 INTERSECTION WITH WOOD STREET, OVER 10 ABANDONED RAILROAD, DURYEA BOROUGH, 11 RAILROAD ABUTMENTS REMOVAL 26,000 12 (BASE PROJECT ALLOCATION - $18,000) 13 (LAND ALLOCATION - $8,000) 14 SECTION 45. LYCOMING COUNTY. 15 (A) LOCAL BRIDGES 16 (1) ARMSTRONG TOWNSHIP, T-329 OVER 17 MOSQUITO CREEK, BRIDGE REPLACEMENT 339,000 18 (BASE PROJECT ALLOCATION - $300,000) 19 (DESIGN AND CONTINGENCIES - $39,000) 20 (B) STATE BRIDGES 21 (1) SR 0654 OVER BENDERS RUN, BASTRESS 22 TOWNSHIP, BRIDGE REPLACEMENT 450,000 23 (BASE PROJECT ALLOCATION - $300,000) 24 (LAND ALLOCATION - $30,000) 25 (DESIGN AND CONTINGENCIES - $120,000) 26 (2) SR 2001 OVER BLACK HOLE CREEK, CLINTON 27 TOWNSHIP, BRIDGE REPLACEMENT 161,000 28 (BASE PROJECT ALLOCATION - $100,000) 29 (LAND ALLOCATION - $15,000) 30 (DESIGN AND CONTINGENCIES - $46,000) 20080S1503B2376 - 187 -
1 (3) SR 2019, BRIDGE NO.24895 OVER GERMAN 2 RUN, FRANKLIN TOWNSHIP, BRIDGE 3 REPLACEMENT 134,000 4 (BASE PROJECT ALLOCATION - $134,000) 5 (4) WINTERSTEEN ROAD OVER BRANCH OF WEST 6 BRANCH RUN, FRANKLIN TOWNSHIP, BRIDGE 7 REPLACEMENT 134,000 8 (BASE PROJECT ALLOCATION - $134,000) 9 (5) SR 0042 OVER LITTLE MUNCY CREEK, 10 JORDAN TOWNSHIP, BRIDGE REPLACEMENT 760,000 11 (BASE PROJECT ALLOCATION - $610,000) 12 (LAND ALLOCATION - $30,000) 13 (DESIGN AND CONTINGENCIES - $120,000) 14 (6) SR 0973 OVER HOAGLAND RUN, LYCOMING 15 TOWNSHIP, BRIDGE REPLACEMENT 290,000 16 (BASE PROJECT ALLOCATION - $180,000) 17 (LAND ALLOCATION - $10,000) 18 (DESIGN AND CONTINGENCIES - $100,000) 19 (7) SR 3005 OVER MUD ROAD, MIFFLIN 20 TOWNSHIP, BRIDGE REPLACEMENT 130,000 21 (BASE PROJECT ALLOCATION - $100,000) 22 (DESIGN AND CONTINGENCIES - $30,000) 23 (8) SR 2019, BRIDGE NO.24893 OVER GERMAN 24 RUN, MORELAND TOWNSHIP, BRIDGE 25 REPLACEMENT 134,000 26 (BASE PROJECT ALLOCATION - $134,000) 27 (9) SR 2048 OVER LITTLE MUNCY CREEK, MUNCY 28 CREEK TOWNSHIP, BRIDGE REPLACEMENT 292,000 29 (BASE PROJECT ALLOCATION - $240,000) 30 (LAND ALLOCATION - $15,000) 20080S1503B2376 - 188 -
1 (DESIGN AND CONTINGENCIES - $37,000) 2 (10) SR 2014 OVER TWIN RUN, MUNCY 3 TOWNSHIP, BRIDGE REPLACEMENT 250,000 4 (BASE PROJECT ALLOCATION - $200,000) 5 (LAND ALLOCATION - $10,000) 6 (DESIGN AND CONTINGENCIES - $40,000) 7 (11) SR 3014 OVER BOTTLE RUN, OLD LYCOMING 8 TOWNSHIP, BRIDGE REHABILITATION 110,000 9 (BASE PROJECT ALLOCATION - $100,000) 10 (DESIGN AND CONTINGENCIES - $10,000) 11 (12) SR 0864, BRIDGE NO.24776 OVER MILL 12 CREEK, UPPER FAIRFIELD TOWNSHIP, BRIDGE 13 REHABILITATION 130,000 14 (BASE PROJECT ALLOCATION - $100,000) 15 (LAND ALLOCATION - $10,000) 16 (DESIGN AND CONTINGENCIES - $20,000) 17 (13) SR 2002 OVER LAUREL RUN, WASHINGTON 18 TOWNSHIP, BRIDGE REPLACEMENT 150,000 19 (BASE PROJECT ALLOCATION - $120,000) 20 (DESIGN AND CONTINGENCIES - $30,000) 21 SECTION 46. MCKEAN COUNTY. 22 (A) LOCAL BRIDGES (RESERVED) 23 (B) STATE BRIDGES 24 (1) SR 0155 OVER ANNIN CREEK, ANNIN 25 TOWNSHIP, BRIDGE REPLACEMENT 2,850,000 26 (BASE PROJECT ALLOCATION - $2,000,000) 27 (LAND ALLOCATION - $200,000) 28 (DESIGN AND CONTINGENCIES - $650,000) 29 (2) SR 1002 OVER ALLEGHENY RIVER, ANNIN 30 TOWNSHIP, BRIDGE REHABILITATION 837,000 20080S1503B2376 - 189 -
1 (BASE PROJECT ALLOCATION - $437,000) 2 (LAND ALLOCATION - $100,000) 3 (DESIGN AND CONTINGENCIES - $300,000) 4 (3) SR 0046 OVER KENDALL CREEK, FOSTER 5 TOWNSHIP, BRIDGE REPLACEMENT 215,000 6 (BASE PROJECT ALLOCATION - $140,000) 7 (DESIGN AND CONTINGENCIES - $75,000) 8 (4) SR 0346 OVER BRANCH OF FOSTER BROOK, 9 FOSTER TOWNSHIP, BRIDGE REPLACEMENT 1,225,000 10 (BASE PROJECT ALLOCATION - $800,000) 11 (LAND ALLOCATION - $125,000) 12 (DESIGN AND CONTINGENCIES - $300,000) 13 (5) SR 0046, PA 46 OVER BRANCH OF KENDALL 14 CREEK, FOSTER TOWNSHIP, BRIDGE 15 REPLACEMENT 515,000 16 (BASE PROJECT ALLOCATION - $140,000) 17 (LAND ALLOCATION - $50,000) 18 (DESIGN AND CONTINGENCIES - $325,000) 19 (6) SR 0146 OVER BRANCH OF WARNER BROOK, 20 HAMLIN TOWNSHIP, BRIDGE REPLACEMENT 215,000 21 (BASE PROJECT ALLOCATION - $140,000) 22 (DESIGN AND CONTINGENCIES - $75,000) 23 (7) SR 0059 OVER WARNER BROOK, KEATING 24 TOWNSHIP, BRIDGE REPLACEMENT 275,000 25 (BASE PROJECT ALLOCATION - $200,000) 26 (DESIGN AND CONTINGENCIES - $75,000) 27 (8) SR 1002 OVER BRANCH PERCE BROOK, 28 KEATING TOWNSHIP, BRIDGE REPLACEMENT 300,000 29 (BASE PROJECT ALLOCATION - $200,000) 30 (LAND ALLOCATION - $50,000) 20080S1503B2376 - 190 -
1 (DESIGN AND CONTINGENCIES - $50,000) 2 (9) SR 0155 OVER ALLEGHENY RIVER, LIBERTY 3 TOWNSHIP, BRIDGE REHABILITATION 650,000 4 (BASE PROJECT ALLOCATION - $650,000) 5 (10) SR 0155 OVER HAMILTON RUN, LIBERTY 6 TOWNSHIP, BRIDGE REHABILITATION 650,000 7 (BASE PROJECT ALLOCATION - $650,000) 8 (11) SR 0046 OVER BRANCH OF POTATO CREEK, 9 NORWICH TOWNSHIP, BRIDGE REPLACEMENT 300,000 10 (BASE PROJECT ALLOCATION - $200,000) 11 (LAND ALLOCATION - $50,000) 12 (DESIGN AND CONTINGENCIES - $50,000) 13 (12) SR 0246 OVER BAKER RUN, OTTO 14 TOWNSHIP, BRIDGE REPLACEMENT 1,975,000 15 (BASE PROJECT ALLOCATION - $1,250,000) 16 (LAND ALLOCATION - $125,000) 17 (DESIGN AND CONTINGENCIES - $600,000) 18 (13) SR 0346 OVER WINDFALL RUN, OTTO 19 TOWNSHIP, BRIDGE REPLACEMENT 300,000 20 (BASE PROJECT ALLOCATION - $200,000) 21 (LAND ALLOCATION - $50,000) 22 (DESIGN AND CONTINGENCIES - $50,000) 23 (14) SR 0006 OVER MARVIN CREEK, SMETHPORT 24 BOROUGH, BRIDGE REPLACEMENT 2,385,000 25 (BASE PROJECT ALLOCATION - $2,000,000) 26 (LAND ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $365,000) 28 SECTION 47. MERCER COUNTY. 29 (A) LOCAL BRIDGES 30 (1) DELAWARE TOWNSHIP, LINE ROAD, BR.1415 20080S1503B2376 - 191 -
1 OVER BRANCH OF SHENANGO RIVER, BRIDGE 2 REPLACEMENT 430,000 3 (BASE PROJECT ALLOCATION - $300,000) 4 (LAND ALLOCATION - $10,000) 5 (DESIGN AND CONTINGENCIES - $120,000) 6 (2) DELAWARE TOWNSHIP, PEW ROAD, BR.1412 7 OVER BRANCH OF SHENANGO RIVER, BRIDGE 8 REPLACEMENT 380,000 9 (BASE PROJECT ALLOCATION - $250,000) 10 (LAND ALLOCATION - $10,000) 11 (DESIGN AND CONTINGENCIES - $120,000) 12 (3) SHENANGO TOWNSHIP, OAK HILL ROAD, BR. 13 2809 OVER TURKEY RUN, BRIDGE 14 REPLACEMENT 660,000 15 (BASE PROJECT ALLOCATION - $500,000) 16 (LAND ALLOCATION - $10,000) 17 (DESIGN AND CONTINGENCIES - $150,000) 18 (4) SHENANGO TOWNSHIP, HEASLEY ROAD, BR. 19 2805 OVER BRANCH OF SHENANGO RIVER, 20 BRIDGE REPLACEMENT 510,000 21 (BASE PROJECT ALLOCATION - $350,000) 22 (LAND ALLOCATION - $10,000) 23 (DESIGN AND CONTINGENCIES - $150,000) 24 (5) HERMITAGE TOWNSHIP, SAMPLE ROAD, BR. 25 2326 OVER HOGBACK RUN, BRIDGE 26 REPLACEMENT 390,000 27 (BASE PROJECT ALLOCATION - $250,000) 28 (LAND ALLOCATION - $20,000) 29 (DESIGN AND CONTINGENCIES - $120,000) 30 (6) CITY OF SHARON, WENGLER AVENUE, BR. 20080S1503B2376 - 192 -
1 2329 OVER PINE RUN, BRIDGE REPLACEMENT 930,000 2 (BASE PROJECT ALLOCATION - $700,000) 3 (LAND ALLOCATION - $30,000) 4 (DESIGN AND CONTINGENCIES - $200,000) 5 (7) GREENE TOWNSHIP, WEST COUNTY LINE 6 ROAD, BR.199 OVER BRANCH OF SHENANGO 7 RIVER, BRIDGE REPLACEMENT 910,000 8 (BASE PROJECT ALLOCATION - $700,000) 9 (LAND ALLOCATION - $10,000) 10 (DESIGN AND CONTINGENCIES - $200,000) 11 (8) LAKE TOWNSHIP, PARKER ROAD, BR.2116 12 OVER FOX RUN, BRIDGE REPLACEMENT 510,000 13 (BASE PROJECT ALLOCATION - $350,000) 14 (LAND ALLOCATION - $10,000) 15 (DESIGN AND CONTINGENCIES - $150,000) 16 (9) SANDY CREEK TOWNSHIP, OLD PERRY 17 HIGHWAY, BR.408 OVER SANDY CREEK, 18 BRIDGE REHABILITATION 275,000 19 (BASE PROJECT ALLOCATION - $200,000) 20 (DESIGN AND CONTINGENCIES - $75,000) 21 (10) SANDY CREEK TOWNSHIP, BISHOP ROAD, 22 BR. 402 OVER SANDY CREEK, BRIDGE 23 REHABILITATION 275,000 24 (BASE PROJECT ALLOCATION - $200,000) 25 (DESIGN AND CONTINGENCIES - $75,000) 26 (11) MILLCREEK TOWNSHIP, FOSTER ROAD, BR. 27 1203 OVER MILL CREEK, BRIDGE 28 REHABILITATION 250,000 29 (BASE PROJECT ALLOCATION - $175,000) 30 (DESIGN AND CONTINGENCIES - $75,000) 20080S1503B2376 - 193 -
1 (12) WOLF CREEK TOWNSHIP, MONTGOMERY DAM 2 ROAD, BR. 2704 OVER WOLF CREEK, BRIDGE 3 REHABILITATION 275,000 4 (BASE PROJECT ALLOCATION - $200,000) 5 (DESIGN AND CONTINGENCIES - $75,000) 6 (13) SPRINGFIELD TOWNSHIP, OLD MERCER 7 ROAD, BR. 3001 OVER PINE CREEK, BRIDGE 8 REHABILITATION 275,000 9 (BASE PROJECT ALLOCATION - $200,000) 10 (DESIGN AND CONTINGENCIES - $75,000) 11 (14) FRENCH CREEK TOWNSHIP, CREEK ROAD, 12 BR. 611 OVER NORTH DEER CREEK, BRIDGE 13 REHABILITATION 275,000 14 (BASE PROJECT ALLOCATION - $200,000) 15 (DESIGN AND CONTINGENCIES - $75,000) 16 (15) OTTER CREEK TOWNSHIP, STRAUB ROAD, 17 BR. 906 OVER BRANCH OF OTTER CREEK, 18 BRIDGE REHABILITATION 250,000 19 (BASE PROJECT ALLOCATION - $175,000) 20 (DESIGN AND CONTINGENCIES - $75,000) 21 (16) DELAWARE TOWNSHIP, LINE ROAD, BR. 22 1415 OVER BRANCH OF SHENANGO RIVER, 23 BRIDGE REPLACEMENT 430,000 24 (BASE PROJECT ALLOCATION - $300,000) 25 (LAND ALLOCATION - $10,000) 26 (DESIGN AND CONTINGENCIES - $120,000) 27 (17) DELAWARE TOWNSHIP, PEW ROAD, BR. 1412 28 OVER BRANCH OF SHENANGO RIVER, BRIDGE 29 REPLACEMENT 380,000 30 (BASE PROJECT ALLOCATION - $250,000) 20080S1503B2376 - 194 -
1 (LAND ALLOCATION - $10,000) 2 (DESIGN AND CONTINGENCIES - $120,000) 3 (18) SHENANGO TOWNSHIP, OAK HILL ROAD, BR. 4 2809 OVER TURKEY RUN, BRIDGE 5 REPLACEMENT 660,000 6 (BASE PROJECT ALLOCATION - $500,000) 7 (LAND ALLOCATION - $10,000) 8 (DESIGN AND CONTINGENCIES - $150,000) 9 (19) SHENANGO TOWNSHIP, HEASLEY ROAD, BR. 10 2805 OVER BRANCH OF SHENANGO RIVER, 11 BRIDGE REPLACEMENT 510,000 12 (BASE PROJECT ALLOCATION - $350,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $150,000) 15 (20) CITY OF HERMITAGE, SAMPLE ROAD, BR. 16 2326 OVER HOGBACK RUN, BRIDGE 17 REPLACEMENT 390,000 18 (BASE PROJECT ALLOCATION - $250,000) 19 (LAND ALLOCATION - $20,000) 20 (DESIGN AND CONTINGENCIES - $120,000) 21 (21) CITY OF SHARON, WENGLER AVENUE, BR. 22 2329 OVER PINE RUN, BRIDGE REPLACEMENT 930,000 23 (BASE PROJECT ALLOCATION - $700,000) 24 (LAND ALLOCATION - $30,000) 25 (DESIGN AND CONTINGENCIES - $200,000) 26 (22) GREENE TOWNSHIP, WEST COUNTY LINE 27 ROAD, BR. 199 OVER BRANCH OF SHENANGO 28 RIVER, BRIDGE REPLACEMENT 910,000 29 (BASE PROJECT ALLOCATION - $700,000) 30 (LAND ALLOCATION - $10,000) 20080S1503B2376 - 195 -
1 (DESIGN AND CONTINGENCIES - $200,000) 2 (23) LAKE TOWNSHIP, PARKER ROAD, BR. 2116 3 OVER FOX RUN, BRIDGE REPLACEMENT 510,000 4 (BASE PROJECT ALLOCATION - $350,000) 5 (LAND ALLOCATION - $10,000) 6 (DESIGN AND CONTINGENCIES - $150,000) 7 (24) SANDY CREEK TOWNSHIP, OLD PERRY 8 HIGHWAY, BR. 408 OVER SANDY CREEK, 9 BRIDGE REHABILITATION 275,000 10 (BASE PROJECT ALLOCATION - $200,000) 11 (DESIGN AND CONTINGENCIES - $75,000) 12 (25) SANDY CREEK TOWNSHIP, BISHOP ROAD, 13 BR. 402 OVER SANDY CREEK, BRIDGE 14 REHABILITATION 275,000 15 (BASE PROJECT ALLOCATION - $200,000) 16 (DESIGN AND CONTINGENCIES - $75,000) 17 (26) MILLCREEK TOWNSHIP, FOSTER ROAD, BR. 18 1203 OVER MILL CREEK, BRIDGE 19 REHABILITATION 250,000 20 (BASE PROJECT ALLOCATION - $175,000) 21 (DESIGN AND CONTINGENCIES - $75,000) 22 (27) WOLF CREEK TOWNSHIP, MONTGOMERY DAM 23 ROAD, BR. 2704 OVER WOLF CREEK, BRIDGE 24 REHABILITATION 275,000 25 (BASE PROJECT ALLOCATION - $200,000) 26 (DESIGN AND CONTINGENCIES - $75,000) 27 (28) SPRINGFIELD TOWNSHIP, OLD MERCER 28 ROAD, BR. 3001 OVER PINE CREEK, BRIDGE 29 REHABILITATION 275,000 30 (BASE PROJECT ALLOCATION - $200,000) 20080S1503B2376 - 196 -
1 (DESIGN AND CONTINGENCIES - $75,000) 2 (29) FRENCH CREEK TOWNSHIP, CREEK ROAD, 3 BR. 611 OVER NORTH DEER CREEK, BRIDGE 4 REHABILITATION 275,000 5 (BASE PROJECT ALLOCATION - $200,000) 6 (DESIGN AND CONTINGENCIES - $75,000) 7 (30) OTTER CREEK TOWNSHIP, STRAUB ROAD, 8 BR. 906 OVER BRANCH OF OTTER CREEK, 9 BRIDGE REHABILITATION 250,000 10 (BASE PROJECT ALLOCATION - $175,000) 11 (DESIGN AND CONTINGENCIES - $75,000) 12 (B) STATE BRIDGES 13 (1) SR 0018 OVER SHENANGO RIVER, CLARK 14 BOROUGH, BRIDGE REHABILITATION 4,150,000 15 (BASE PROJECT ALLOCATION - $4,000,000) 16 (DESIGN AND CONTINGENCIES - $150,000) 17 (2) SR 0318 OVER TRIBUTARY OF BEAVER RUN, 18 EAST LACKAWANNOCK TOWNSHIP, BRIDGE 19 REHABILITATION 36,000 20 (BASE PROJECT ALLOCATION - $36,000) 21 (3) SR 2019 OVER SR 0079, LAKE TOWNSHIP, 22 BRIDGE REHABILITATION 2,200,000 23 (BASE PROJECT ALLOCATION - $2,000,000) 24 (DESIGN AND CONTINGENCIES - $200,000) 25 (4) SR 0019 OVER LITTLE SHENANGO RIVER, 26 PERRY TOWNSHIP, BRIDGE REPLACEMENT 150,000 27 (BASE PROJECT ALLOCATION - $80,000) 28 (LAND ALLOCATION - $10,000) 29 (DESIGN AND CONTINGENCIES - $60,000) 30 (5) SR 0019, PERRY HIGHWAY OVER LITTLE 20080S1503B2376 - 197 -
1 SHENANGO RIVER, PERRY TOWNSHIP, BRIDGE 2 REHABILITATION 36,000 3 (BASE PROJECT ALLOCATION - $36,000) 4 (6) SR 0019, PERRY HIGHWAY OVER MILLNER 5 RUN, PERRY TOWNSHIP, BRIDGE 6 REHABILITATION 13,000 7 (BASE PROJECT ALLOCATION - $13,000) 8 (7) SR 0019 OVER BLACK RUN, SANDY CREEK 9 TOWNSHIP, BRIDGE REPLACEMENT 1,350,000 10 (BASE PROJECT ALLOCATION - $1,000,000) 11 (DESIGN AND CONTINGENCIES - $350,000) 12 (8) SR 0018, NEW CASTLE ROAD OVER HOG BACK 13 RUN, SHENANGO TOWNSHIP, BRIDGE 14 REHABILITATION 36,000 15 (BASE PROJECT ALLOCATION - $36,000) 16 (9) SR 0551, PULASKI ROAD OVER TRIBUTARY 17 OF SHENANGO RIVER, SHENANGO TOWNSHIP, 18 BRIDGE REHABILITATION 13,000 19 (BASE PROJECT ALLOCATION - $13,000) 20 (10) SR 0019, PERRY HIGHWAY OVER JOHNSTON 21 RUN, SPRINGFIELD TOWNSHIP, BRIDGE 22 REHABILITATION 12,000 23 (BASE PROJECT ALLOCATION - $12,000) 24 (11) SR 0019, PERRY HIGHWAY OVER SMALL 25 STREAM, SPRINGFIELD TOWNSHIP, BRIDGE 26 REHABILITATION 13,000 27 (BASE PROJECT ALLOCATION - $13,000) 28 (12) SR 0358, VERNON ROAD OVER BRANCH OF 29 BOOTH RUN, WEST SALEM TOWNSHIP, BRIDGE 30 REHABILITATION 13,000 20080S1503B2376 - 198 -
1 (BASE PROJECT ALLOCATION - $13,000) 2 (13) SR 0173 OVER MILL CREEK, WORTH 3 TOWNSHIP, BRIDGE REPLACEMENT 950,000 4 (BASE PROJECT ALLOCATION - $700,000) 5 (DESIGN AND CONTINGENCIES - $250,000) 6 SECTION 48. MIFFLIN COUNTY. 7 (A) LOCAL BRIDGES 8 (1) DECATUR TOWNSHIP, T-737 OVER TRIBUTARY 9 OF MEADOW CREEK, BRIDGE REPLACEMENT 154,000 10 (BASE PROJECT ALLOCATION - $154,000) 11 (B) STATE BRIDGES 12 (1) SR 1002 OVER HONEY CREEK, ARMAGH 13 TOWNSHIP, BRIDGE REPLACEMENT 300,000 14 (BASE PROJECT ALLOCATION - $200,000) 15 (DESIGN AND CONTINGENCIES - $100,000) 16 (2) SR 1005 OVER LAUREL RUN, ARMAGH 17 TOWNSHIP, BRIDGE REPLACEMENT 1,600,000 18 (BASE PROJECT ALLOCATION - $1,000,000) 19 (LAND ALLOCATION - $300,000) 20 (DESIGN AND CONTINGENCIES - $300,000) 21 (3) SR 2002 OVER BELLTOWN RUN, DECATUR 22 TOWNSHIP, BRIDGE REPLACEMENT 300,000 23 (BASE PROJECT ALLOCATION - $200,000) 24 (LAND ALLOCATION - $50,000) 25 (DESIGN AND CONTINGENCIES - $50,000) 26 (4) SR 0022 OVER VALLEY ROAD, DERRY 27 TOWNSHIP, BRIDGE REHABILITATION 856,000 28 (BASE PROJECT ALLOCATION - $780,000) 29 (LAND ALLOCATION - $20,000) 30 (DESIGN AND CONTINGENCIES - $56,000) 20080S1503B2376 - 199 -
1 (5) SR 0022 OVER TR T315, JACKS CREEK, 2 DERRY TOWNSHIP, BRIDGE REHABILITATION 856,000 3 (BASE PROJECT ALLOCATION - $780,000) 4 (LAND ALLOCATION - $20,000) 5 (DESIGN AND CONTINGENCIES - $56,000) 6 (6) SR 2001 OVER TRIBUTARY OF JACKS CREEK, 7 DERRY TOWNSHIP, BRIDGE REPLACEMENT 3,375,000 8 (BASE PROJECT ALLOCATION - $2,500,000) 9 (LAND ALLOCATION - $175,000) 10 (DESIGN AND CONTINGENCIES - $700,000) 11 (7) SR 2001 OVER JACKS CREEK, DERRY 12 TOWNSHIP, BRIDGE REPLACEMENT 1,600,000 13 (BASE PROJECT ALLOCATION - $1,000,000) 14 (LAND ALLOCATION - $300,000) 15 (DESIGN AND CONTINGENCIES - $300,000) 16 (8) SR 0103 OVER TRIBUTARY OF JUNIATA 17 RIVER, GRANVILLE TOWNSHIP, BRIDGE 18 REPLACEMENT 215,000 19 (BASE PROJECT ALLOCATION - $140,000) 20 (DESIGN AND CONTINGENCIES - $75,000) 21 (9) SR 3017 OVER TRIBUTARY OF JUNIATA 22 RIVER, WAYNE TOWNSHIP, BRIDGE 23 REPLACEMENT 216,000 24 (BASE PROJECT ALLOCATION - $140,000) 25 (LAND ALLOCATION - $30,000) 26 (DESIGN AND CONTINGENCIES - $46,000) 27 SECTION 49. MONROE COUNTY. 28 (A) LOCAL BRIDGES 29 (1) SMITHFIELD TOWNSHIP, TWIN FALLS ROAD 30 BRIDGE OVER MARSHALLS CREEK, BRIDGE 20080S1503B2376 - 200 -
1 REPLACEMENT 500,000 2 (BASE PROJECT ALLOCATION - $500,000) 3 (B) STATE BRIDGES 4 (1) SR 2003 OVER CHERRY CREEK, HAMILTON 5 TOWNSHIP, BRIDGE REPLACEMENT 1,550,000 6 (BASE PROJECT ALLOCATION - $750,000) 7 (LAND ALLOCATION - $100,000) 8 (DESIGN AND CONTINGENCIES - $700,000) 9 SECTION 50. MONTGOMERY COUNTY. 10 (A) LOCAL BRIDGES 11 (1) WHITEMARSH TOWNSHIP, VALLEY ROAD OVER 12 WISSAHICKON CREEK, BRIDGE REPLACEMENT 710,000 13 (BASE PROJECT ALLOCATION - $225,000) 14 (LAND ALLOCATION - $10,000) 15 (DESIGN AND CONTINGENCIES - $475,000) 16 (2) HORSHAM TOWNSHIP, KEITH VALLEY ROAD 17 OVER PARK CREEK, BRIDGE REPLACEMENT 1,550,000 18 (BASE PROJECT ALLOCATION - $1,300,000) 19 (LAND ALLOCATION - $50,000) 20 (DESIGN AND CONTINGENCIES - $200,000) 21 (3) HORSHAM TOWNSHIP, DAVIS GROVE ROAD 22 OVER PARK CREEK, BRIDGE REPLACEMENT 1,550,000 23 (BASE PROJECT ALLOCATION - $1,300,000) 24 (LAND ALLOCATION - $50,000) 25 (DESIGN AND CONTINGENCIES - $200,000) 26 (4) UPPER GWYNEDD TOWNSHIP, SUMNEYTOWN 27 PIKE OVER SUMNEYTOWN PIKE, BRIDGE 28 REPLACEMENT 7,500,000 29 (BASE PROJECT ALLOCATION - $7,500,000) 30 (5) UPPER DUBLIN TOWNSHIP, BUTLER PIKE 20080S1503B2376 - 201 -
1 OVER WISSAHICKON CREEK, BRIDGE NO.1, 2 BRIDGE REPLACEMENT 4,100,000 3 (BASE PROJECT ALLOCATION - $3,500,000) 4 (LAND ALLOCATION - $100,000) 5 (DESIGN AND CONTINGENCIES - $500,000) 6 (6) UPPER DUBLIN TOWNSHIP, BUTLER PIKE 7 OVER WISSAHICKON CREEK, BRIDGE NO.2, 8 BRIDGE REPLACEMENT 700,000 9 (BASE PROJECT ALLOCATION - $500,000) 10 (DESIGN AND CONTINGENCIES - $200,000) 11 (7) NEW HANOVER TOWNSHIP, LUTHERAN ROAD 12 OVER TRIBUTARY OF MINISTER CREEK, 13 BRIDGE REPLACEMENT 1,750,000 14 (BASE PROJECT ALLOCATION - $1,750,000) 15 (8) TOWAMENCIN TOWNSHIP, RITTENHOUSE ROAD 16 OVER SKIPPACK CREEK, BRIDGE 17 RESTORATION 1,000,000 18 (BASE PROJECT ALLOCATION - $1,000,000) 19 (9) LOWER SALFORD TOWNSHIP, BERGEYS MILL 20 ROAD OVER EAST BRANCH OF PERKIOMEN 21 CREEK, BRIDGE REPLACEMENT 2,350,000 22 (BASE PROJECT ALLOCATION - $2,350,000) 23 (10) LOWER SALFORD TOWNSHIP, CAMP WAWA 24 ROAD OVER EAST BRANCH OF PERKIOMEN 25 CREEK, BRIDGE REPLACEMENT 2,550,000 26 (BASE PROJECT ALLOCATION - $2,550,000) 27 (11) UPPER HANOVER TOWNSHIP, ELEVENTH 28 STREET OVER MACOBY CREEK, BRIDGE 29 REHABILITATION 600,000 30 (BASE PROJECT ALLOCATION - $600,000) 20080S1503B2376 - 202 -
1 (12) NORRISTOWN BOROUGH, STERIGERE STREET 2 OVER STONY CREEK, BRIDGE 3 REHABILITATION 2,400,000 4 (BASE PROJECT ALLOCATION - $2,400,000) 5 (B) STATE BRIDGES 6 (1) SR 0232, HUNTINGDON PIKE OVER 7 PENNYPACK CREEK, ABINGTON TOWNSHIP, 8 BRIDGE REHABILITATION 63,000 9 (BASE PROJECT ALLOCATION - $11,000) 10 (LAND ALLOCATION - $1,000) 11 (DESIGN AND CONTINGENCIES - $51,000) 12 (2) SR 0152, LIMEKILN PIKE OVER SEPTA, 13 ABINGTON TOWNSHIP, BRIDGE 14 REHABILITATION 2,900,000 15 (BASE PROJECT ALLOCATION - $2,000,000) 16 (LAND ALLOCATION - $500,000) 17 (DESIGN AND CONTINGENCIES - $400,000) 18 (3) SR 0202, DEKALB PIKE OVER NORFOLK 19 SOUTHERN, BRIDGEPORT BOROUGH, BRIDGE 20 REHABILITATION 63,000 21 (BASE PROJECT ALLOCATION - $11,000) 22 (LAND ALLOCATION - $1,000) 23 (DESIGN AND CONTINGENCIES - $51,000) 24 (4) SR 1050, CONGO ROAD OVER MIDDLE CREEK, 25 DOUGLASS TOWNSHIP, BRIDGE 26 REHABILITATION 63,000 27 (BASE PROJECT ALLOCATION - $11,000) 28 (LAND ALLOCATION - $1,000) 29 (DESIGN AND CONTINGENCIES - $51,000) 30 (5) SR 8012, RAMP F OVER CITY LINE AVENUE 20080S1503B2376 - 203 -
1 NORTH BOUND RAMP, LOWER MERION 2 TOWNSHIP, BRIDGE REHABILITATION 2,000,000 3 (BASE PROJECT ALLOCATION - $2,000,000) 4 (6) SR 8012, RAMP G OVER RAMP B, RAMP C, 5 LOWER MERION TOWNSHIP, BRIDGE 6 REHABILITATION 2,000,000 7 (BASE PROJECT ALLOCATION - $2,000,000) 8 (7) SR 0076, SCHUYLKILL EXPRESSWAY OVER 9 GULLEY RUN, LOWER MERION TOWNSHIP, 10 BRIDGE REHABILITATION 63,000 11 (BASE PROJECT ALLOCATION - $11,000) 12 (LAND ALLOCATION - $1,000) 13 (DESIGN AND CONTINGENCIES - $51,000) 14 (8) SR 0076, SCHUYLKILL EXPRESSWAY OVER 15 MILL CREEK, MILL CREEK ROAD, LOWER 16 MERION TOWNSHIP, BRIDGE REHABILITATION 63,000 17 (BASE PROJECT ALLOCATION - $11,000) 18 (LAND ALLOCATION - $1,000) 19 (DESIGN AND CONTINGENCIES - $51,000) 20 (9) SR 0076, SCHUYLKILL EXPRESSWAY OVER 21 CONRAIL RAILROAD, LOWER MERION 22 TOWNSHIP, BRIDGE REHABILITATION 2,000,000 23 (BASE PROJECT ALLOCATION - $2,000,000) 24 (10) SR 0076, SCHUYLKILL EXPRESSWAY OVER 25 BELMONT AVENUE, LOWER MERION TOWNSHIP, 26 BRIDGE REHABILITATION 2,000,000 27 (BASE PROJECT ALLOCATION - $2,000,000) 28 (11) SR 0076, SCHUYLKILL EXPRESSWAY OVER 29 RAMP G FROM WEST BOUND I-76, LOWER 30 MERION TOWNSHIP, BRIDGE REHABILITATION 2,000,000 20080S1503B2376 - 204 -
1 (BASE PROJECT ALLOCATION - $2,000,000) 2 (12) SR 0076, SCHUYLKILL EXPRESSWAY OVER 3 CITY LINE AVENUE, RAMP F, LOWER MERION 4 TOWNSHIP, BRIDGE REHABILITATION 2,000,000 5 (BASE PROJECT ALLOCATION - $2,000,000) 6 (13) SR 0076, SCHUYLKILL EXPRESSWAY OVER 7 CITY LINE AVENUE, RAMP C, LOWER MERION 8 TOWNSHIP, BRIDGE REHABILITATION 2,000,000 9 (BASE PROJECT ALLOCATION - $2,000,000) 10 (14) SR 0076, SCHUYLKILL EXPRESSWAY OVER 11 HOLLOW ROAD CREEK, LOWER MERION 12 TOWNSHIP, BRIDGE REHABILITATION 2,000,000 13 (BASE PROJECT ALLOCATION - $2,000,000) 14 (15) SR 1030, SWAMP CREEK ROAD OVER UNAMI 15 CREEK, MARLBOROUGH TOWNSHIP, BRIDGE 16 REHABILITATION 1,389,000 17 (BASE PROJECT ALLOCATION - $96,000) 18 (LAND ALLOCATION - $31,000) 19 (DESIGN AND CONTINGENCIES - $1,262,000) 20 (16) KEIM STREET OVER SCHUYLKILL RIVER, 21 POTTSTOWN BOROUGH, BRIDGE REPLACEMENT 2,512,000 22 (BASE PROJECT ALLOCATION - $2,250,000) 23 (LAND ALLOCATION - $22,000) 24 (DESIGN AND CONTINGENCIES - $240,000) 25 (17) TR 100 OVER SCHUYLKILL RIVER ROAD, 26 POTTSTOWN BOROUGH, BRIDGE 27 REHABILITATION 63,000 28 (BASE PROJECT ALLOCATION - $11,000) 29 (LAND ALLOCATION - $1,000) 30 (DESIGN AND CONTINGENCIES - $51,000) 20080S1503B2376 - 205 -
1 (18) SR 4005, MILL ROAD OVER SKIPPACK 2 CREEK, SKIPPACK TOWNSHIP, BRIDGE 3 REHABILITATION 1,389,000 4 (BASE PROJECT ALLOCATION - $96,000) 5 (LAND ALLOCATION - $31,000) 6 (DESIGN AND CONTINGENCIES - $1,262,000) 7 (19) SR 2027, PENNSYLVANIA AVENUE OVER 8 SANDY RUN, SPRINGFIELD TOWNSHIP, BRIDGE 9 REPLACEMENT 3,500,000 10 (BASE PROJECT ALLOCATION - $575,000) 11 (LAND ALLOCATION - $40,000) 12 (DESIGN AND CONTINGENCIES - $2,885,000) 13 (20) SR 1036, JAMES STREET OVER MACOBY 14 CREEK, UPPER HANOVER TOWNSHIP, BRIDGE 15 REHABILITATION 1,389,000 16 (BASE PROJECT ALLOCATION - $96,000) 17 (LAND ALLOCATION - $31,000) 18 (DESIGN AND CONTINGENCIES - $1,262,000) 19 (21) SR 0663, LAYFIELD ROAD OVER PERKIOMEN 20 CREEK, UPPER HANOVER TOWNSHIP, BRIDGE 21 REHABILITATION 114,000 22 (BASE PROJECT ALLOCATION - $11,000) 23 (LAND ALLOCATION - $1,000) 24 (DESIGN AND CONTINGENCIES - $102,000) 25 (22) SR 1044, PALM HILL ROAD OVER 26 PERKIOMEN CREEK, UPPER HANOVER 27 TOWNSHIP, BRIDGE REHABILITATION 63,000 28 (BASE PROJECT ALLOCATION - $11,000) 29 (LAND ALLOCATION - $1,000) 30 (DESIGN AND CONTINGENCIES - $51,000) 20080S1503B2376 - 206 -
1 (23) SR 1038, QUAKERTOWN ROAD OVER BRANCH 2 OF MACOBY CREEK, UPPER HANOVER 3 TOWNSHIP, BRIDGE REHABILITATION 63,000 4 (BASE PROJECT ALLOCATION - $11,000) 5 (LAND ALLOCATION - $1,000) 6 (DESIGN AND CONTINGENCIES - $51,000) 7 (24) SR 0422, COUNTY LINE ROAD OVER 8 SCHUYLKILL RIVER, CONRAIL RAILROAD, 9 UPPER MERION TOWNSHIP, BRIDGE 10 REHABILITATION 267,000 11 (BASE PROJECT ALLOCATION - $267,000) 12 (25) SR 0076, SCHUYLKILL EXPRESSWAY OVER 13 NORTH GULPH ROAD, UPPER MERION 14 TOWNSHIP, BRIDGE REHABILITATION 2,000,000 15 (BASE PROJECT ALLOCATION - $2,000,000) 16 (26) SR 0611, OLD YORK ROAD OVER BRANCH OF 17 PENNYPACK CREEK, UPPER MORELAND 18 TOWNSHIP, BRIDGE REPLACEMENT 10,000,000 19 (BASE PROJECT ALLOCATION - $863,000) 20 (LAND ALLOCATION - $200,000) 21 (DESIGN AND CONTINGENCIES - $8,937,000) 22 (27) SR 2040, WARMINSTER ROAD OVER 23 PENNYPACK CREEK, UPPER MORELAND 24 TOWNSHIP, BRIDGE REPLACEMENT 3,500,000 25 (BASE PROJECT ALLOCATION - $863,000) 26 (LAND ALLOCATION - $55,000) 27 (DESIGN AND CONTINGENCIES - $2,582,000) 28 (28) SR 1024, SALFORD STATION OVER MILL 29 RACE, UPPER SALFORD TOWNSHIP, BRIDGE 30 REPLACEMENT 2,326,000 20080S1503B2376 - 207 -
1 (BASE PROJECT ALLOCATION - $2,000,000) 2 (LAND ALLOCATION - $25,000) 3 (DESIGN AND CONTINGENCIES - $301,000) 4 (29) SR 1024, SALFORD STATION OVER 5 PERKIOMEN CREEK, UPPER SALFORD 6 TOWNSHIP, BRIDGE REPLACEMENT 6,926,000 7 (BASE PROJECT ALLOCATION - $6,000,000) 8 (LAND ALLOCATION - $75,000) 9 (DESIGN AND CONTINGENCIES - $851,000) 10 (30) SR 0076, SCHUYLKILL EXPRESSWAY OVER 11 LR 46138, ARROWMINK CREEK, WEST 12 CONSHOHOCKEN BOROUGH, BRIDGE 13 REHABILITATION 2,000,000 14 (BASE PROJECT ALLOCATION - $2,000,000) 15 (31) SR 0422, COUNTY LINE EXPRESSWAY OVER 16 BIKE PATH, WEST NORRITON TOWNSHIP, 17 BRIDGE REHABILITATION 267,000 18 (BASE PROJECT ALLOCATION - $267,000) 19 (32) SR 0422, COUNTY LINE EXPRESSWAY OVER 20 INDIAN DRIVE, WEST NORRITON TOWNSHIP, 21 BRIDGE REHABILITATION 267,000 22 (BASE PROJECT ALLOCATION - $267,000) 23 (33) GROSSTOWN ROAD OVER MANATAWNY CREEK, 24 WEST POTTSGROVE TOWNSHIP, BRIDGE 25 REPLACEMENT 5,376,000 26 (BASE PROJECT ALLOCATION - $806,000) 27 (LAND ALLOCATION - $70,000) 28 (DESIGN AND CONTINGENCIES - $4,500,000) 29 (34) SR 3003, STENTON AVENUE OVER 30 WISSAHICKON CREEK, WHITEMARSH TOWNSHIP, 20080S1503B2376 - 208 -
1 BRIDGE REPLACEMENT 4,000,000 2 (BASE PROJECT ALLOCATION - $575,000) 3 (LAND ALLOCATION - $50,000) 4 (DESIGN AND CONTINGENCIES - $3,375,000) 5 (35) SR 1002 OVER TOWAMENCIN CREEK, 6 TOWAMENCIN TOWNSHIP, BRIDGE 7 REPLACEMENT 5,270,000 8 (BASE PROJECT ALLOCATION - $4,100,000) 9 (LAND ALLOCATION - $500,000) 10 (DESIGN AND CONTINGENCIES - $670,000) 11 SECTION 51. MONTOUR COUNTY. 12 (A) LOCAL BRIDGES (RESERVED) 13 (B) STATE BRIDGES 14 (1) SR 0044 OVER BRANCH OF CHILLISQUAQUE 15 CREEK, ANTHONY TOWNSHIP, BRIDGE 16 REPLACEMENT 120,000 17 (BASE PROJECT ALLOCATION - $120,000) 18 (2) SR 1006 OVER WHITE HALL CREEK, ANTHONY 19 TOWNSHIP, BRIDGE REPLACEMENT 150,000 20 (BASE PROJECT ALLOCATION - $120,000) 21 (DESIGN AND CONTINGENCIES - $30,000) 22 (3) SR 2006 OVER TRIBUTARY OF SUSQUEHANNA 23 RIVER, COOPER TOWNSHIP, BRIDGE 24 REPLACEMENT 220,000 25 (BASE PROJECT ALLOCATION - $150,000) 26 (LAND ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $50,000) 28 (4) SR 1007 OVER MUD CREEK, DERRY 29 TOWNSHIP, BRIDGE REPLACEMENT 190,000 30 (BASE PROJECT ALLOCATION - $120,000) 20080S1503B2376 - 209 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $50,000) 3 (5) SR 0044 OVER CHILLISQUAQUE CREEK, 4 LIMESTONE TOWNSHIP, BRIDGE REPLACEMENT 30,000 5 (DESIGN AND CONTINGENCIES - $30,000) 6 (6) SR 2008 OVER SECHLER RUN, MAHONING 7 TOWNSHIP, BRIDGE REPLACEMENT 260,000 8 (BASE PROJECT ALLOCATION - $120,000) 9 (LAND ALLOCATION - $110,000) 10 (DESIGN AND CONTINGENCIES - $30,000) 11 (7) SR 2008 OVER TRIBUTARY OF ESCHER RUN, 12 MAHONING TOWNSHIP, BRIDGE REPLACEMENT 150,000 13 (BASE PROJECT ALLOCATION - $100,000) 14 (DESIGN AND CONTINGENCIES - $50,000) 15 SECTION 52. NORTHAMPTON COUNTY. 16 (A) LOCAL BRIDGES 17 (1) CITY OF EASTON, BUSHKILL STREET OVER 18 BUSHKILL CREEK, BRIDGE REHABILITATION 1,000,000 19 (BASE PROJECT ALLOCATION - $1,000,000) 20 (2) CITY OF EASTON, GLENDON HILL ROAD OVER 21 LEHIGH RIVER, BRIDGE REHABILITATION 1,000,000 22 (BASE PROJECT ALLOCATION - $1,000,000) 23 (B) STATE BRIDGES 24 (1) PA 611 OVER TRIBUTARY OF OUGHOUGHTON 25 CREEK, LOWER MT. BETHEL TOWNSHIP, 26 BRIDGE REPLACEMENT 800,000 27 (BASE PROJECT ALLOCATION - $400,000) 28 (LAND ALLOCATION - $50,000) 29 (DESIGN AND CONTINGENCIES - $350,000) 30 (2) SR 0946 OVER HOKENDAUQUA CREEK, MOORE 20080S1503B2376 - 210 -
1 TOWNSHIP, BRIDGE REPLACEMENT 975,000 2 (BASE PROJECT ALLOCATION - $475,000) 3 (LAND ALLOCATION - $50,000) 4 (DESIGN AND CONTINGENCIES - $450,000) 5 (3) SR 2017, BUSHKILL STREET OVER BUSHKILL 6 CREEK, STOCKERTOWN BOROUGH, BRIDGE 7 REMOVAL 615,000 8 (BASE PROJECT ALLOCATION - $505,000) 9 (LAND ALLOCATION - $10,000) 10 (DESIGN AND CONTINGENCIES - $100,000) 11 (4) PA 191 OVER SR 0033, STOCKERTOWN 12 BOROUGH, BRIDGE REHABILITATION 695,000 13 (BASE PROJECT ALLOCATION - $135,000) 14 (LAND ALLOCATION - $20,000) 15 (DESIGN AND CONTINGENCIES - $540,000) 16 (5) SR 1033, NORTH MAIN OVER MARTINS 17 CREEK, WASHINGTON TOWNSHIP, BRIDGE 18 REPLACEMENT 300,000 19 (BASE PROJECT ALLOCATION - $80,000) 20 (LAND ALLOCATION - $50,000) 21 (DESIGN AND CONTINGENCIES - $170,000) 22 (6) SR 1002 OVER BUSHKILL CREEK, TATAMY 23 BOROUGH, BRIDGE REPLACEMENT 2,000,000 24 (BASE PROJECT ALLOCATION - $2,000,000) 25 SECTION 53. NORTHUMBERLAND COUNTY. 26 (A) LOCAL BRIDGES (RESERVED) 27 (B) STATE BRIDGES 28 (1) SR 0061 OVER SUSQUEHANNA RIVER, CITY 29 OF SUNBURY, BRIDGE REHABILITATION 94,000 30 (BASE PROJECT ALLOCATION - $80,000) 20080S1503B2376 - 211 -
1 (LAND ALLOCATION - $4,000) 2 (DESIGN AND CONTINGENCIES - $10,000) 3 (2) SR 1016 OVER TRIBUTARY OF MUDDY RUN, 4 DELAWARE TOWNSHIP, BRIDGE REPLACEMENT 360,000 5 (BASE PROJECT ALLOCATION - $260,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $80,000) 8 (3) SR 0405 OVER TRIBUTARY OF DELAWARE 9 RUN, DELAWARE TOWNSHIP, BRIDGE 10 REHABILITATION 400,000 11 (BASE PROJECT ALLOCATION - $300,000) 12 (LAND ALLOCATION - $40,000) 13 (DESIGN AND CONTINGENCIES - $60,000) 14 (4) SR 3018 OVER TRIBUTARY OF MAHANTANGO 15 CREEK, JORDAN TOWNSHIP, BRIDGE 16 REPLACEMENT 145,000 17 (BASE PROJECT ALLOCATION - $100,000) 18 (LAND ALLOCATION - $15,000) 19 (DESIGN AND CONTINGENCIES - $30,000) 20 (5) SR 3019 OVER TRIBUTARY OF MAHANTANGO 21 CREEK, JORDAN TOWNSHIP, BRIDGE 22 REPLACEMENT 190,000 23 (BASE PROJECT ALLOCATION - $120,000) 24 (LAND ALLOCATION - $20,000) 25 (DESIGN AND CONTINGENCIES - $50,000) 26 (6) SR 1008 OVER TRIBUTARY OF WARRIOR RUN 27 CREEK, LEWIS TOWNSHIP, BRIDGE 28 REPLACEMENT 240,000 29 (BASE PROJECT ALLOCATION - $120,000) 30 (LAND ALLOCATION - $70,000) 20080S1503B2376 - 212 -
1 (DESIGN AND CONTINGENCIES - $50,000) 2 (7) SR 1011 OVER TRIBUTARY OF WARRIOR RUN, 3 LEWIS TOWNSHIP, BRIDGE REPLACEMENT 140,000 4 (BASE PROJECT ALLOCATION - $100,000) 5 (LAND ALLOCATION - $10,000) 6 (DESIGN AND CONTINGENCIES - $30,000) 7 (8) SR 1015 OVER MUDDY RUN, LEWIS 8 TOWNSHIP, BRIDGE REPLACEMENT 150,000 9 (BASE PROJECT ALLOCATION - $120,000) 10 (DESIGN AND CONTINGENCIES - $30,000) 11 (9) SR 0147 OVER TRIBUTARY OF SUSQUEHANNA 12 RIVER, POINT TOWNSHIP, BRIDGE 13 REHABILITATION 428,000 14 (BASE PROJECT ALLOCATION - $400,000) 15 (LAND ALLOCATION - $8,000) 16 (DESIGN AND CONTINGENCIES - $20,000) 17 (10) SR 1024 OVER TRIBUTARY OF SUSQUEHANNA 18 RIVER, POINT TOWNSHIP, BRIDGE 19 REPLACEMENT 100,000 20 (BASE PROJECT ALLOCATION - $100,000) 21 (11) SR 0487 OVER SHAMOKIN CREEK, RALPHO 22 TOWNSHIP, BRIDGE REHABILITATION 520,000 23 (BASE PROJECT ALLOCATION - $500,000) 24 (DESIGN AND CONTINGENCIES - $20,000) 25 (12) SR 2013 OVER BENNY'S RUN, SHAMOKIN 26 TOWNSHIP, BRIDGE REPLACEMENT 165,000 27 (BASE PROJECT ALLOCATION - $120,000) 28 (LAND ALLOCATION - $15,000) 29 (DESIGN AND CONTINGENCIES - $30,000) 30 SECTION 54. PERRY COUNTY. 20080S1503B2376 - 213 -
1 (A) LOCAL BRIDGES (RESERVED) 2 (B) STATE BRIDGES 3 (1) SR 4010 OVER LUTMAN RUN, CENTRE 4 TOWNSHIP, BRIDGE REPLACEMENT 100,000 5 (BASE PROJECT ALLOCATION - $100,000) 6 (2) US 22/322 BRIDGE NO.29473 OVER 7 COCOLAMUS CREEK, GREENWOOD TOWNSHIP, 8 BRIDGE REHABILITATION 2,645,000 9 (BASE PROJECT ALLOCATION - $1,245,000) 10 (DESIGN AND CONTINGENCIES - $1,400,000) 11 (3) US 22/322 BRIDGE NO.29475 OVER 12 COCOLAMUS CREEK, GREENWOOD TOWNSHIP, 13 BRIDGE REHABILITATION 2,645,000 14 (BASE PROJECT ALLOCATION - $1,245,000) 15 (DESIGN AND CONTINGENCIES - $1,400,000) 16 (4) PA 0849 OVER BUFFALO CREEK, JUNIATA 17 TOWNSHIP, BRIDGE REHABILITATION 1,200,000 18 (BASE PROJECT ALLOCATION - $1,200,000) 19 (5) PA 17 OVER BUFFALO CREEK, SAVILLE 20 TOWNSHIP, BRIDGE REHABILITATION 2,540,000 21 (BASE PROJECT ALLOCATION - $1,140,000) 22 (DESIGN AND CONTINGENCIES - $1,400,000) 23 (6) US 22/322 EAST BOUND OVER SR 1028, 24 WATTS TOWNSHIP, BRIDGE REHABILITATION 1,500,000 25 (BASE PROJECT ALLOCATION - $1,500,000) 26 SECTION 55. PHILADELPHIA. 27 (A) LOCAL BRIDGES 28 (1) CITY OF PHILADELPHIA, BELLS MILL ROAD 29 OVER WISSANICKON CREEK, BRIDGE 30 REHABILITATION 330,000 20080S1503B2376 - 214 -
1 (BASE PROJECT ALLOCATION - $300,000) 2 (DESIGN AND CONTINGENCIES - $30,000) 3 (B) STATE BRIDGES 4 (1) 21ST STREET OVER VINE STREET 5 EXPRESSWAY, CITY OF PHILADELPHIA, 6 BRIDGE REPLACEMENT 4,373,000 7 (BASE PROJECT ALLOCATION - $460,000) 8 (LAND ALLOCATION - $143,000) 9 (DESIGN AND CONTINGENCIES - $3,770,000) 10 (2) 22ND STREET OVER VINE STREET 11 EXPRESSWAY, CITY OF PHILADELPHIA, 12 BRIDGE REPLACEMENT 4,373,000 13 (BASE PROJECT ALLOCATION - $460,000) 14 (LAND ALLOCATION - $143,000) 15 (DESIGN AND CONTINGENCIES - $3,770,000) 16 (3) SR 3003, 34TH STREET OVER CSX RAILROAD 17 TUNNELS, CITY OF PHILADELPHIA, BRIDGE 18 REPLACEMENT 8,900,000 19 (BASE PROJECT ALLOCATION - $1,497,000) 20 (LAND ALLOCATION - $200,000) 21 (DESIGN AND CONTINGENCIES - $7,203,000) 22 (4) SR 3021, 49TH STREET OVER AMTRAK, CITY 23 OF PHILADELPHIA, BRIDGE REPLACEMENT 5,020,000 24 (BASE PROJECT ALLOCATION - $920,000) 25 (LAND ALLOCATION - $100,000) 26 (DESIGN AND CONTINGENCIES - $4,000,000) 27 (5) SR 3023, 65TH STREET OVER COBBS CREEK, 28 CITY OF PHILADELPHIA, BRIDGE 29 REHABILITATION 63,000 30 (BASE PROJECT ALLOCATION - $11,000) 20080S1503B2376 - 215 -
1 (LAND ALLOCATION - $1,000) 2 (DESIGN AND CONTINGENCIES - $51,000) 3 (6) SR 3007, BEN FRANKLIN PARKWAY OVER 4 VINE STREET EXPRESSWAY, CITY OF 5 PHILADELPHIA, BRIDGE REPLACEMENT 4,373,000 6 (BASE PROJECT ALLOCATION - $460,000) 7 (LAND ALLOCATION - $143,000) 8 (DESIGN AND CONTINGENCIES - $3,770,000) 9 (7) SR 0611, BROAD STREET OVER ROOSEVELT 10 BOULEVARD, CITY OF PHILADELPHIA, BRIDGE 11 REHABILITATION 63,000 12 (BASE PROJECT ALLOCATION - $11,000) 13 (LAND ALLOCATION - $1,000) 14 (DESIGN AND CONTINGENCIES - $51,000) 15 (8) SR 2010, CECIL MOO AVENUE OVER AMTRAK, 16 CITY OF PHILADELPHIA, BRIDGE 17 REPLACEMENT 27,713,000 18 (BASE PROJECT ALLOCATION - $2,073,000) 19 (LAND ALLOCATION - $700,000) 20 (DESIGN AND CONTINGENCIES - 21 $24,940,000) 22 (9) SR 0003, CHESTNUT STREET OVER CSX 23 RAILROAD, CITY OF PHILADELPHIA, BRIDGE 24 REHABILITATION 1,389,000 25 (BASE PROJECT ALLOCATION - $96,000) 26 (LAND ALLOCATION - $31,000) 27 (DESIGN AND CONTINGENCIES - $1,262,000) 28 (10) SR 1004, ERIE AVENUE OVER CONRAIL 29 RAILROAD, TRACKS REMOVED, CITY OF 30 PHILADELPHIA, BRIDGE REHABILITATION 63,000 20080S1503B2376 - 216 -
1 (BASE PROJECT ALLOCATION - $11,000) 2 (LAND ALLOCATION - $1,000) 3 (DESIGN AND CONTINGENCIES - $51,000) 4 (11) SR 2007, FRANKFORD AVENUE OVER 5 FRANKFORD CREEK, CITY OF PHILADELPHIA, 6 BRIDGE REHABILITATION 1,389,000 7 (BASE PROJECT ALLOCATION - $96,000) 8 (LAND ALLOCATION - $31,000) 9 (DESIGN AND CONTINGENCIES - $1,262,000) 10 (12) SR 4001, HENRY AVENUE OVER US 1 11 ROOSEVELT BOULEVARD, CITY OF 12 PHILADELPHIA, BRIDGE REHABILITATION 63,000 13 (BASE PROJECT ALLOCATION - $11,000) 14 (LAND ALLOCATION - $1,000) 15 (DESIGN AND CONTINGENCIES - $51,000) 16 (13) I-95 OVER CAMBRIA STREET AND ANN 17 STREET, CITY OF PHILADELPHIA, BRIDGE 18 REHABILITATION 18,000,000 19 (BASE PROJECT ALLOCATION - $18,000,000) 20 (14) MARKET STREET OVER I-95 RAMPS, 21 COLUMBUS BOULEVARD, CITY OF 22 PHILADELPHIA, BRIDGE REHABILITATION 63,000 23 (BASE PROJECT ALLOCATION - $11,000) 24 (LAND ALLOCATION - $1,000) 25 (DESIGN AND CONTINGENCIES - $51,000) 26 (15) SR 3010, MARKET STREET OVER 27 SCHUYLKILL RIVER, CITY OF PHILADELPHIA, 28 BRIDGE REHABILITATION 17,833,000 29 (BASE PROJECT ALLOCATION - $13,333,000) 30 (LAND ALLOCATION - $2,000,000) 20080S1503B2376 - 217 -
1 (DESIGN AND CONTINGENCIES - $2,500,000) 2 (16) SR 3010, MARKET STREET OVER 3 SCHUYLKILL EXPRESSWAY, AMTRAK, CITY OF 4 PHILADELPHIA, BRIDGE REHABILITATION 17,833,000 5 (BASE PROJECT ALLOCATION - $13,333,000) 6 (LAND ALLOCATION - $2,000,000) 7 (DESIGN AND CONTINGENCIES - $2,500,000) 8 (17) PEDESTRIAN BRIDGE, 18TH AND 19TH 9 COURT HOUSE OVER VINE STREET 10 EXPRESSWAY, CITY OF PHILADELPHIA, 11 BRIDGE REPLACEMENT 4,373,000 12 (BASE PROJECT ALLOCATION - $460,000) 13 (LAND ALLOCATION - $143,000) 14 (DESIGN AND CONTINGENCIES - $3,770,000) 15 (18) PEDESTRIAN BRIDGE 18TH AND 19TH 16 LIBRARY OVER VINE STREET EXPRESSWAY, 17 CITY OF PHILADELPHIA, BRIDGE 18 REPLACEMENT 4,373,000 19 (BASE PROJECT ALLOCATION - $460,000) 20 (LAND ALLOCATION - $143,000) 21 (DESIGN AND CONTINGENCIES - $3,770,000) 22 (19) SR 1016, PENNYPACK CIRCLE BRIDGE 23 NO.38356 OVER ROOSEVELT BOULEVARD, CITY 24 OF PHILADELPHIA, BRIDGE REPLACEMENT 12,500,000 25 (BASE PROJECT ALLOCATION - $1,892,000) 26 (LAND ALLOCATION - $274,000) 27 (DESIGN AND CONTINGENCIES - 28 $10,334,000) 29 (20) SR 1016, PENNYPACK CIRCLE BRIDGE 30 NO.38357 OVER ROOSEVELT BOULEVARD, CITY 20080S1503B2376 - 218 -
1 OF PHILADELPHIA, BRIDGE REPLACEMENT 12,500,000 2 (BASE PROJECT ALLOCATION - $1,892,000) 3 (LAND ALLOCATION - $274,000) 4 (DESIGN AND CONTINGENCIES - 5 $10,334,000) 6 (21) SR 0076, RAMP E/RAMP H OVER TRIBUTARY 7 OF SCHUYLKILL RIVER, CITY OF 8 PHILADELPHIA, BRIDGE REHABILITATION 2,000,000 9 (BASE PROJECT ALLOCATION - $2,000,000) 10 (22) SR 0001, ROOSEVELT BOULEVARD OVER 11 ROBERTS AVENUE, SEPTA, CITY OF 12 PHILADELPHIA, BRIDGE REPLACEMENT 35,000,000 13 (BASE PROJECT ALLOCATION - $3,600,000) 14 (LAND ALLOCATION - $200,000) 15 (DESIGN AND CONTINGENCIES - 16 $31,200,000) 17 (23) SR 0076, SCHUYLKILL EXPRESSWAY OVER 18 RAMP C FROM VINE STREET, CITY OF 19 PHILADELPHIA, BRIDGE REHABILITATION 2,000,000 20 (BASE PROJECT ALLOCATION - $2,000,000) 21 (24) SR 0076, SCHUYLKILL EXPRESSWAY OVER 22 SCHUYLKILL RIVER BANK, CITY OF 23 PHILADELPHIA, BRIDGE REHABILITATION 2,000,000 24 (BASE PROJECT ALLOCATION - $2,000,000) 25 (25) SR 0076, SCHUYLKILL EXPRESSWAY OVER 26 MONTGOMERY DRIVE, CITY OF PHILADELPHIA, 27 BRIDGE REHABILITATION 2,000,000 28 (BASE PROJECT ALLOCATION - $2,000,000) 29 (26) SR 0076, SCHUYLKILL EXPRESSWAY OVER 30 BLACK ROAD, CITY OF PHILADELPHIA, 20080S1503B2376 - 219 -
1 BRIDGE REHABILITATION 2,000,000 2 (BASE PROJECT ALLOCATION - $2,000,000) 3 (27) SR 0076, SCHUYLKILL EXPRESSWAY OVER 4 NEILL DRIVE, CITY OF PHILADELPHIA, 5 BRIDGE REHABILITATION 2,000,000 6 (BASE PROJECT ALLOCATION - $2,000,000) 7 (28) SR 0076, SCHUYLKILL EXPRESSWAY OVER 8 LR 67058, RAMP B, CITY OF PHILADELPHIA, 9 BRIDGE REHABILITATION 2,000,000 10 (BASE PROJECT ALLOCATION - $2,000,000) 11 (29) SR 0076, SCHUYLKILL EXPRESSWAY BRIDGE 12 NO.38479 OVER PILE SUPPORTED SLAB, CITY 13 OF PHILADELPHIA, BRIDGE REHABILITATION 2,000,000 14 (BASE PROJECT ALLOCATION - $2,000,000) 15 (30) SR 0076, SCHUYLKILL EXPRESSWAY BRIDGE 16 NO.38484 OVER PILE SUPPORTED SLAB, CITY 17 OF PHILADELPHIA, BRIDGE REHABILITATION 2,000,000 18 (BASE PROJECT ALLOCATION - $2,000,000) 19 (31) SR 3003, UNIVERSITY AVENUE OVER CSX 20 RAILROAD, CITY OF PHILADELPHIA, BRIDGE 21 REPLACEMENT 7,070,000 22 (BASE PROJECT ALLOCATION - $920,000) 23 (LAND ALLOCATION - $150,000) 24 (DESIGN AND CONTINGENCIES - $6,000,000) 25 (32) SR 0676, VINE STREET OVER SCHUYLKILL 26 RIVER, RAMP D, CITY OF PHILADELPHIA, 27 BRIDGE REPLACEMENT 4,373,000 28 (BASE PROJECT ALLOCATION - $460,000) 29 (LAND ALLOCATION - $143,000) 30 (DESIGN AND CONTINGENCIES - $3,770,000) 20080S1503B2376 - 220 -
1 (33) SR 1011, WILLITS ROAD OVER WOODEN 2 BRIDGE RUN, CITY OF PHILADELPHIA, 3 BRIDGE REHABILITATION 3,150,000 4 (BASE PROJECT ALLOCATION - $2,000,000) 5 (LAND ALLOCATION - $300,000) 6 (DESIGN AND CONTINGENCIES - $850,000) 7 (34) SR 3010, MARKET STREET OVER CSX 8 RAILROAD, CITY OF PHILADELPHIA, BRIDGE 9 REHABILITATION 17,833,000 10 (BASE PROJECT ALLOCATION - $13,333,000) 11 (LAND ALLOCATION - $2,000,000) 12 (DESIGN AND CONTINGENCIES - $2,500,000) 13 SECTION 56. PIKE COUNTY. 14 (A) LOCAL BRIDGES 15 (1) GREENE TOWNSHIP, T-372, SAWMILL ROAD 16 OVER BRIDGE CREEK, BRIDGE 17 REHABILITATION 32,000 18 (BASE PROJECT ALLOCATION - $32,000) 19 (2) GREENE TOWNSHIP, T-374, MOUNTAIN VIEW 20 ROAD OVER SUGAR HILL CREEK, BRIDGE 21 REHABILITATION 15,000 22 (BASE PROJECT ALLOCATION - $15,000) 23 (3) GREENE TOWNSHIP, T-378, CREEK ROAD 24 OVER EAST BRANCH OF WALLENPAUPACK 25 CREEK, BRIDGE REHABILITATION 25,000 26 (BASE PROJECT ALLOCATION - $25,000) 27 (4) GREENE TOWNSHIP, T-390 OVER MOZETTE 28 CREEK, BRIDGE REHABILITATION 21,000 29 (BASE PROJECT ALLOCATION - $21,000) 30 (5) GREENE TOWNSHIP, T-343, LAKE RUSSELL 20080S1503B2376 - 221 -
1 ROAD OVER FREELING RUN, BRIDGE 2 REHABILITATION 15,000 3 (BASE PROJECT ALLOCATION - $15,000) 4 (6) GREENE TOWNSHIP, T-380, CREEK ROAD 5 OVER EAST BRANCH OF WALLENPAUPACK 6 CREEK, BRIDGE REHABILITATION 45,000 7 (BASE PROJECT ALLOCATION - $45,000) 8 (7) SHOHOLA TOWNSHIP, SR 1006, KNEALING 9 ROAD OVER SHOHOLA CREEK, BRIDGE 10 REHABILITATION 1,000,000 11 (BASE PROJECT ALLOCATION - $1,000,000) 12 (8) WESTFALL TOWNSHIP, BLUESTONE 13 BOULEVARD, CUMMINS HILL ROAD OVER BUSH 14 KILL, BRIDGE REPLACEMENT 275,000 15 (BASE PROJECT ALLOCATION - $200,000) 16 (DESIGN AND CONTINGENCIES - $75,000) 17 (9) LACKAWAXEN TOWNSHIP, T-438 OVER WATER 18 SPAN, BRIDGE REPLACEMENT 630,000 19 (BASE PROJECT ALLOCATION - $630,000) 20 (10) LEHMAN TOWNSHIP, T-301 OVER LITTLE 21 BUSHKILL, BRIDGE REPLACEMENT 630,000 22 (BASE PROJECT ALLOCATION - $630,000) 23 (11) PORTER TOWNSHIP, T-317 OVER BIG 24 BUSHKILL, BRIDGE REPLACEMENT 630,000 25 (BASE PROJECT ALLOCATION - $630,000) 26 (12) PORTER TOWNSHIP, T-317 OVER SPRUCE 27 RUN, BRIDGE REPLACEMENT 630,000 28 (BASE PROJECT ALLOCATION - $630,000) 29 (13) LEHMAN TOWNSHIP, T-322 OVER LAKE 30 MASKENHOZA, BRIDGE REPLACEMENT 630,000 20080S1503B2376 - 222 -
1 (BASE PROJECT ALLOCATION - $630,000) 2 (B) STATE BRIDGES 3 (1) SR 0006 OVER SAWKILL CREEK, MILFORD 4 TOWNSHIP, BRIDGE REHABILITATION 281,000 5 (BASE PROJECT ALLOCATION - $194,000) 6 (LAND ALLOCATION - $19,000) 7 (DESIGN AND CONTINGENCIES - $68,000) 8 SECTION 57. POTTER COUNTY. 9 (A) LOCAL BRIDGES (RESERVED) 10 (B) STATE BRIDGES 11 (1) SR 2001 OVER KETTLE CREEK, ABBOTT 12 TOWNSHIP, BRIDGE REPLACEMENT 354,000 13 (BASE PROJECT ALLOCATION - $240,000) 14 (LAND ALLOCATION - $30,000) 15 (DESIGN AND CONTINGENCIES - $84,000) 16 (2) SR 0049 OVER MARSH CREEK, BINGHAM 17 TOWNSHIP, BRIDGE REPLACEMENT 275,000 18 (BASE PROJECT ALLOCATION - $200,000) 19 (DESIGN AND CONTINGENCIES - $75,000) 20 (3) SR 0872 OVER MILL CREEK, COUDERSPORT 21 BOROUGH, BRIDGE REPLACEMENT 1,400,000 22 (BASE PROJECT ALLOCATION - $1,000,000) 23 (LAND ALLOCATION - $200,000) 24 (DESIGN AND CONTINGENCIES - $200,000) 25 (4) SR 0244 OVER CRYDER CREEK, GENESEE 26 TOWNSHIP, BRIDGE REPLACEMENT 1,400,000 27 (BASE PROJECT ALLOCATION - $1,000,000) 28 (LAND ALLOCATION - $200,000) 29 (DESIGN AND CONTINGENCIES - $200,000) 30 (5) SR 0049 OVER DODGE HOLLOW RUN, 20080S1503B2376 - 223 -
1 HARRISON TOWNSHIP, BRIDGE REPLACEMENT 852,000 2 (BASE PROJECT ALLOCATION - $140,000) 3 (LAND ALLOCATION - $100,000) 4 (DESIGN AND CONTINGENCIES - $612,000) 5 (6) SR 0049, BRIDGE NO.30189 OVER 6 COWANESQUE CREEK, HARRISON TOWNSHIP, 7 BRIDGE REPLACEMENT 1,575,000 8 (BASE PROJECT ALLOCATION - $850,000) 9 (LAND ALLOCATION - $125,000) 10 (DESIGN AND CONTINGENCIES - $600,000) 11 (7) SR 0049, BRIDGE NO.30196 OVER 12 COWANESQUE CREEK, HARRISON TOWNSHIP, 13 BRIDGE REPLACEMENT 872,000 14 (BASE PROJECT ALLOCATION - $160,000) 15 (LAND ALLOCATION - $100,000) 16 (DESIGN AND CONTINGENCIES - $612,000) 17 (8) SR 1021 OVER COWANESQUE RIVER, 18 HARRISON TOWNSHIP, BRIDGE REPLACEMENT 550,000 19 (BASE PROJECT ALLOCATION - $400,000) 20 (LAND ALLOCATION - $30,000) 21 (DESIGN AND CONTINGENCIES - $120,000) 22 (9) SR 0044 OVER SOUTH BRANCH OSWAYO 23 CREEK, HEBRON TOWNSHIP, BRIDGE 24 REPLACEMENT 1,400,000 25 (BASE PROJECT ALLOCATION - $1,000,000) 26 (LAND ALLOCATION - $200,000) 27 (DESIGN AND CONTINGENCIES - $200,000) 28 (10) SR 4025 OVER BRIZZLE HOLLOW RUN, 29 OSWAYO TOWNSHIP, BRIDGE REPLACEMENT 324,000 30 (BASE PROJECT ALLOCATION - $220,000) 20080S1503B2376 - 224 -
1 (LAND ALLOCATION - $30,000) 2 (DESIGN AND CONTINGENCIES - $74,000) 3 (11) SR 1005 OVER LITTLE PHOENIX RUN, PIKE 4 TOWNSHIP, BRIDGE REPLACEMENT 300,000 5 (BASE PROJECT ALLOCATION - $200,000) 6 (LAND ALLOCATION - $50,000) 7 (DESIGN AND CONTINGENCIES - $50,000) 8 (12) SR 3002 OVER COWLEY RUN, PORTAGE 9 TOWNSHIP, BRIDGE REPLACEMENT 494,000 10 (BASE PROJECT ALLOCATION - $344,000) 11 (LAND ALLOCATION - $30,000) 12 (DESIGN AND CONTINGENCIES - $120,000) 13 (13) SR 3003 OVER ELEVEN MILE RUN, 14 SYLVANIA TOWNSHIP, BRIDGE REPLACEMENT 215,000 15 (BASE PROJECT ALLOCATION - $140,000) 16 (DESIGN AND CONTINGENCIES - $75,000) 17 (14) SR 0449 OVER GENESEE RIVER, ULYSSES 18 TOWNSHIP, BRIDGE REPLACEMENT 1,050,000 19 (BASE PROJECT ALLOCATION - $650,000) 20 (LAND ALLOCATION - $150,000) 21 (DESIGN AND CONTINGENCIES - $250,000) 22 (15) SR 0449 OVER CUSHING CREEK, ULYSSES 23 TOWNSHIP, BRIDGE REPLACEMENT 1,400,000 24 (BASE PROJECT ALLOCATION - $1,000,000) 25 (LAND ALLOCATION - $200,000) 26 (DESIGN AND CONTINGENCIES - $200,000) 27 (16) SR 1001 OVER ROGERS RUN, ULYSSES 28 TOWNSHIP, BRIDGE REPLACEMENT 215,000 29 (BASE PROJECT ALLOCATION - $140,000) 30 (DESIGN AND CONTINGENCIES - $75,000) 20080S1503B2376 - 225 -
1 (17) SR 3001 OVER STONE LICK RUN, WHARTON 2 TOWNSHIP, BRIDGE REPLACEMENT 1,400,000 3 (BASE PROJECT ALLOCATION - $1,000,000) 4 (LAND ALLOCATION - $200,000) 5 (DESIGN AND CONTINGENCIES - $200,000) 6 SECTION 58. SCHUYLKILL COUNTY. 7 (A) LOCAL BRIDGES (RESERVED) 8 (B) STATE BRIDGES 9 (1) I-81 SOUTHBOUND, SECTION 1341 OVER 10 READING & NORTHERN RAILROAD, DELANO 11 TOWNSHIP, BRIDGE REHABILITATION 497,000 12 (BASE PROJECT ALLOCATION - $400,000) 13 (LAND ALLOCATION - $20,000) 14 (DESIGN AND CONTINGENCIES - $77,000) 15 (2) I-81 SOUTHBOUND, SECTION 1365 OVER 16 READING & NORTHERN RAILROAD, DELANO 17 TOWNSHIP, BRIDGE REHABILITATION 497,000 18 (BASE PROJECT ALLOCATION - $400,000) 19 (LAND ALLOCATION - $20,000) 20 (DESIGN AND CONTINGENCIES - $77,000) 21 (3) I-81 SOUTHBOUND, SECTION 1374 OVER 22 READING & NORTHERN RAILROAD, KLINE 23 TOWNSHIP, BRIDGE REHABILITATION 497,000 24 (BASE PROJECT ALLOCATION - $400,000) 25 (LAND ALLOCATION - $20,000) 26 (DESIGN AND CONTINGENCIES - $77,000) 27 (4) SR 8017 OVER T-906 MAIN STREET 28 HADDOCK, KLINE TOWNSHIP, BRIDGE 29 REHABILITATION 497,000 30 (BASE PROJECT ALLOCATION - $400,000) 20080S1503B2376 - 226 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $77,000) 3 (5) SR 8017 OVER LR 185, PA 309, KLINE 4 TOWNSHIP, BRIDGE REHABILITATION 497,000 5 (BASE PROJECT ALLOCATION - $400,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $77,000) 8 (6) US 209 OVER SWATARA CREEK, REILLY 9 TOWNSHIP, BRIDGE REPLACEMENT 500,000 10 (BASE PROJECT ALLOCATION - $200,000) 11 (LAND ALLOCATION - $50,000) 12 (DESIGN AND CONTINGENCIES - $250,000) 13 (7) SR 4016 OVER LITTLE MAHANTANGO CREEK, 14 UPPER MAHANTANGO TOWNSHIP, BRIDGE 15 REPLACEMENT 2,000,000 16 (BASE PROJECT ALLOCATION - $1,000,000) 17 (LAND ALLOCATION - $350,000) 18 (DESIGN AND CONTINGENCIES - $650,000) 19 (8) PA 309 OVER LIZARD CREEK, WEST PENN 20 TOWNSHIP, BRIDGE REPLACEMENT 800,000 21 (BASE PROJECT ALLOCATION - $300,000) 22 (LAND ALLOCATION - $100,000) 23 (DESIGN AND CONTINGENCIES - $400,000) 24 SECTION 59. SNYDER COUNTY. 25 (A) LOCAL BRIDGES 26 (1) WEST PERRY TOWNSHIP, CRATER HILL OVER 27 WEST BRANCH OF MAHANTANGO CREEK, BRIDGE 28 REPLACEMENT 24,000 29 (DESIGN AND CONTINGENCIES - $24,000) 30 (2) MIDDLECREEK TOWNSHIP, T-418 OVER 20080S1503B2376 - 227 -
1 UNNAMED TRIBUTARY, BRIDGE REPLACEMENT 165,000 2 (BASE PROJECT ALLOCATION - $150,000) 3 (DESIGN AND CONTINGENCIES - $15,000) 4 (B) STATE BRIDGES 5 (1) SR 0522 OVER WETZEL RUN, BEAVER 6 TOWNSHIP, BRIDGE REPLACEMENT 150,000 7 (BASE PROJECT ALLOCATION - $120,000) 8 (LAND ALLOCATION - $10,000) 9 (DESIGN AND CONTINGENCIES - $20,000) 10 (2) SR 3007 OVER MIDDLE CREEK, FRANKLIN 11 TOWNSHIP, BRIDGE REPLACEMENT 1,850,000 12 (BASE PROJECT ALLOCATION - $1,500,000) 13 (LAND ALLOCATION - $30,000) 14 (DESIGN AND CONTINGENCIES - $320,000) 15 (3) SR 1007 OVER MIDDLE CREEK, MIDDLE 16 CREEK TOWNSHIP, BRIDGE REHABILITATION 530,000 17 (BASE PROJECT ALLOCATION - $500,000) 18 (DESIGN AND CONTINGENCIES - $30,000) 19 (4) RAMP 8007 OVER US 11/15, MONROE 20 TOWNSHIP, BRIDGE REHABILITATION 138,000 21 (BASE PROJECT ALLOCATION - $130,000) 22 (DESIGN AND CONTINGENCIES - $8,000) 23 (5) SR 1016, KRATZERVILLE ROAD OVER 24 TRIBUTARY OF PENNS CREEK, MONROE 25 TOWNSHIP, BRIDGE REPLACEMENT 200,000 26 (BASE PROJECT ALLOCATION - $200,000) 27 (6) SR 0015 NORTHBOUND OVER CARRIE RUN, 28 MONROE TOWNSHIP, BRIDGE REHABILITATION 215,000 29 (BASE PROJECT ALLOCATION - $200,000) 30 (DESIGN AND CONTINGENCIES - $15,000) 20080S1503B2376 - 228 -
1 (7) SR 1020 OVER CARRIE RUN, MONROE 2 TOWNSHIP, BRIDGE REPLACEMENT 150,000 3 (BASE PROJECT ALLOCATION - $120,000) 4 (DESIGN AND CONTINGENCIES - $30,000) 5 (8) SR 11/15 SOUTHBOUND LANE OVER SR 0522, 6 MONROE TOWNSHIP, BRIDGE REHABILITATION 138,000 7 (BASE PROJECT ALLOCATION - $130,000) 8 (DESIGN AND CONTINGENCIES - $8,000) 9 (9) SR 3016, PINE SWAMP ROAD OVER BRANCH 10 OF MAHANTANGO CREEK, PERRY TOWNSHIP, 11 BRIDGE REHABILITATION 525,000 12 (BASE PROJECT ALLOCATION - $500,000) 13 (DESIGN AND CONTINGENCIES - $25,000) 14 (10) SR 3005, QUARRY ROAD OVER BRANCH OF 15 MAHANTANGO CREEK, PERRY TOWNSHIP, 16 BRIDGE REPLACEMENT 130,000 17 (BASE PROJECT ALLOCATION - $100,000) 18 (DESIGN AND CONTINGENCIES - $30,000) 19 (11) SR 3004 OVER BRANCH OF MAHANTANGO 20 CREEK, PERRY TOWNSHIP, BRIDGE 21 REHABILITATION 510,000 22 (BASE PROJECT ALLOCATION - $500,000) 23 (DESIGN AND CONTINGENCIES - $10,000) 24 (12) SR 4005, MIDDLE ROAD OVER KREBS GAP 25 RUN, SPRING TOWNSHIP, BRIDGE 26 REHABILITATION 425,000 27 (BASE PROJECT ALLOCATION - $400,000) 28 (DESIGN AND CONTINGENCIES - $25,000) 29 (13) SR 4008, STAGE ROAD OVER ULSH GAP 30 RUN, SPRING TOWNSHIP, BRIDGE 20080S1503B2376 - 229 -
1 REHABILITATION 1,100,000 2 (BASE PROJECT ALLOCATION - $950,000) 3 (LAND ALLOCATION - $30,000) 4 (DESIGN AND CONTINGENCIES - $120,000) 5 (14) SR 2013 OVER TRIBUTARY OF SUSQUEHANNA 6 RIVER, UNION TOWNSHIP, BRIDGE 7 REPLACEMENT 170,000 8 (BASE PROJECT ALLOCATION - $120,000) 9 (LAND ALLOCATION - $20,000) 10 (DESIGN AND CONTINGENCIES - $30,000) 11 (15) SR 2006, BRIDGE NO.31180 OVER SPRING 12 CREEK, WASHINGTON TOWNSHIP, BRIDGE 13 REPLACEMENT 150,000 14 (BASE PROJECT ALLOCATION - $120,000) 15 (DESIGN AND CONTINGENCIES - $30,000) 16 SECTION 60. SOMERSET COUNTY. 17 (A) LOCAL BRIDGES 18 (1) GARRETT BOROUGH, GARRETT CROSSING OVER 19 SR 2037 AND ABANDONED RAILROAD, BRIDGE 20 CONSTRUCTION 200,000 21 (BASE PROJECT ALLOCATION - $200,000) 22 (B) STATE BRIDGES 23 (1) SR 0601 OVER QUEMAHONING CREEK, 24 BOSWELL BOROUGH, BRIDGE REPLACEMENT 2,940,000 25 (BASE PROJECT ALLOCATION - $2,564,000) 26 (LAND ALLOCATION - $132,000) 27 (DESIGN AND CONTINGENCIES - $244,000) 28 (2) SR 2005 OVER ELK LICK CREEK, ELK LICK 29 TOWNSHIP, BRIDGE REHABILITATION 130,000 30 (BASE PROJECT ALLOCATION - $130,000) 20080S1503B2376 - 230 -
1 (3) SR 3003 OVER TRIBUTARY OF 2 YOUGHIOGHENY, LOWER TURKEYFOOT 3 TOWNSHIP, BRIDGE REHABILITATION 170,000 4 (BASE PROJECT ALLOCATION - $170,000) 5 SECTION 61. SULLIVAN COUNTY. 6 (A) LOCAL BRIDGES (RESERVED) 7 (B) STATE BRIDGES 8 (1) SR 0220 OVER LITTLE LOYALSOCK CREEK, 9 DUSHORE BOROUGH, BRIDGE REPLACEMENT 1,160,000 10 (BASE PROJECT ALLOCATION - $800,000) 11 (LAND ALLOCATION - $30,000) 12 (DESIGN AND CONTINGENCIES - $330,000) 13 (2) SR 4007 OVER KINGS CREEK, ELKLAND 14 TOWNSHIP, BRIDGE REPLACEMENT 145,000 15 (BASE PROJECT ALLOCATION - $130,000) 16 (LAND ALLOCATION - $4,000) 17 (DESIGN AND CONTINGENCIES - $11,000) 18 (3) SR 3009 OVER ROCK RUN, SHREWSBURY 19 TOWNSHIP, BRIDGE REPLACEMENT 120,000 20 (BASE PROJECT ALLOCATION - $120,000) 21 SECTION 62. SUSQUEHANNA COUNTY. 22 (A) LOCAL BRIDGES 23 (1) CHOCONUT TOWNSHIP, CARMALT ROAD T-695 24 OVER CHOCONUT CREEK, BRIDGE 25 REPLACEMENT 356,000 26 (BASE PROJECT ALLOCATION - $320,000) 27 (DESIGN AND CONTINGENCIES - $36,000) 28 (2) SPRINGVILLE TOWNSHIP, T-393, LYNN 29 CEMETERY ROAD OVER WHITE'S CREEK, 30 BRIDGE REPLACEMENT 445,000 20080S1503B2376 - 231 -
1 (BASE PROJECT ALLOCATION - $405,000) 2 (DESIGN AND CONTINGENCIES - $40,000) 3 (B) STATE BRIDGES 4 (1) SR 0706 OVER PETTIS CREEK, BRIDGEWATER 5 TOWNSHIP, BRIDGE REHABILITATION 532,000 6 (BASE PROJECT ALLOCATION - $367,000) 7 (LAND ALLOCATION - $37,000) 8 (DESIGN AND CONTINGENCIES - $128,000) 9 (2) SR 0167 OVER HOP BOTTOM CREEK, 10 BROOKLYN TOWNSHIP, BRIDGE 11 REHABILITATION 229,000 12 (BASE PROJECT ALLOCATION - $158,000) 13 (LAND ALLOCATION - $16,000) 14 (DESIGN AND CONTINGENCIES - $55,000) 15 (3) SR 1018 OVER TRIBUTARY OF DUBOIS 16 CREEK, FRANKLIN TOWNSHIP, BRIDGE 17 REPLACEMENT 596,000 18 (BASE PROJECT ALLOCATION - $411,000) 19 (LAND ALLOCATION - $42,000) 20 (DESIGN AND CONTINGENCIES - $143,000) 21 (4) SR 0092 OVER TRIBUTARY OF TUNKHANNOCK 22 CREEK, GIBSON TOWNSHIP, BRIDGE 23 REPLACEMENT 726,000 24 (BASE PROJECT ALLOCATION - $501,000) 25 (LAND ALLOCATION - $51,000) 26 (DESIGN AND CONTINGENCIES - $174,000) 27 (5) SR 0706 OVER ROE CREEK, JESSUP 28 TOWNSHIP, BRIDGE REHABILITATION 21,000 29 (BASE PROJECT ALLOCATION - $14,000) 30 (LAND ALLOCATION - $2,000) 20080S1503B2376 - 232 -
1 (DESIGN AND CONTINGENCIES - $5,000) 2 (6) SR 1009 OVER STARRUCCA CREEK, 3 LANESBORO BOROUGH, BRIDGE 4 REHABILITATION 199,000 5 (BASE PROJECT ALLOCATION - $137,000) 6 (LAND ALLOCATION - $14,000) 7 (DESIGN AND CONTINGENCIES - $48,000) 8 (7) SR 0081 NORTHBOUND OVER EAST BRANCH OF 9 TUNKHANNOCK CREEK, LENOX TOWNSHIP, 10 BRIDGE REHABILITATION 328,000 11 (BASE PROJECT ALLOCATION - $325,000) 12 (LAND ALLOCATION - $3,000) 13 (8) SR 0081 SOUTHBOUND OVER EAST BRANCH OF 14 TUNKHANNOCK CREEK, LENOX TOWNSHIP, 15 BRIDGE REHABILITATION 328,000 16 (BASE PROJECT ALLOCATION - $325,000) 17 (LAND ALLOCATION - $3,000) 18 (9) SR 0092 OVER LESLIE CREEK, LENOX 19 TOWNSHIP, BRIDGE REHABILITATION 327,000 20 (BASE PROJECT ALLOCATION - $225,000) 21 (LAND ALLOCATION - $22,000) 22 (DESIGN AND CONTINGENCIES - $80,000) 23 (10) SR 2019 OVER WILLOW BROOK, LENOX 24 TOWNSHIP, BRIDGE REPLACEMENT 585,000 25 (BASE PROJECT ALLOCATION - $500,000) 26 (LAND ALLOCATION - $35,000) 27 (DESIGN AND CONTINGENCIES - $50,000) 28 (11) SR 2043 OVER MILLARD CREEK, LENOX 29 TOWNSHIP, BRIDGE REHABILITATION 170,000 30 (BASE PROJECT ALLOCATION - $117,000) 20080S1503B2376 - 233 -
1 (LAND ALLOCATION - $12,000) 2 (DESIGN AND CONTINGENCIES - $41,000) 3 (12) SR 0029 OVER JONES CREEK, LIBERTY 4 TOWNSHIP, BRIDGE REHABILITATION 497,000 5 (BASE PROJECT ALLOCATION - $343,000) 6 (LAND ALLOCATION - $35,000) 7 (DESIGN AND CONTINGENCIES - $119,000) 8 (13) SR 0858 OVER SUMMERS CREEK, 9 MIDDLETOWN TOWNSHIP, BRIDGE 10 REHABILITATION 113,000 11 (BASE PROJECT ALLOCATION - $78,000) 12 (LAND ALLOCATION - $8,000) 13 (DESIGN AND CONTINGENCIES - $27,000) 14 (14) SR 0011 OVER BRANCH OF SALT LICK 15 CREEK, NEW MILFORD BOROUGH, BRIDGE 16 REHABILITATION 112,000 17 (BASE PROJECT ALLOCATION - $77,000) 18 (LAND ALLOCATION - $8,000) 19 (DESIGN AND CONTINGENCIES - $27,000) 20 (15) SR 0011 OVER SALT LICK CREEK, NEW 21 MILFORD TOWNSHIP, BRIDGE 22 REHABILITATION 308,000 23 (BASE PROJECT ALLOCATION - $212,000) 24 (LAND ALLOCATION - $22,000) 25 (DESIGN AND CONTINGENCIES - $74,000) 26 (16) SR 0092 OVER BRANCH OF DRINKERS 27 CREEK, OAKLAND TOWNSHIP, BRIDGE 28 REHABILITATION 284,000 29 (BASE PROJECT ALLOCATION - $196,000) 30 (LAND ALLOCATION - $20,000) 20080S1503B2376 - 234 -
1 (DESIGN AND CONTINGENCIES - $68,000) 2 (17) SR 1005 OVER STARRUCCA CREEK, 3 THOMPSON BOROUGH, BRIDGE 4 REHABILITATION 92,000 5 (BASE PROJECT ALLOCATION - $63,000) 6 (LAND ALLOCATION - $7,000) 7 (DESIGN AND CONTINGENCIES - $22,000) 8 (18) SR 1007 OVER SOUTH BRANCH OF 9 CANAWACTA CREEK, THOMPSON TOWNSHIP, 10 BRIDGE REHABILITATION 299,000 11 (BASE PROJECT ALLOCATION - $206,000) 12 (LAND ALLOCATION - $21,000) 13 (DESIGN AND CONTINGENCIES - $72,000) 14 (19) SR 4024 OVER BRANCH OF ELKHORN CREEK, 15 FARMINGTON TOWNSHIP, BRIDGE 16 REPLACEMENT 180,000 17 (BASE PROJECT ALLOCATION - $150,000) 18 (DESIGN AND CONTINGENCIES - $30,000) 19 SECTION 63. TIOGA COUNTY. 20 (A) LOCAL BRIDGES 21 (1) WELLSBORO BOROUGH, KING STREET OVER 22 KELSEY CREEK, BRIDGE REPLACEMENT 267,000 23 (BASE PROJECT ALLOCATION - $225,000) 24 (LAND ALLOCATION - $6,000) 25 (DESIGN AND CONTINGENCIES - $36,000) 26 (B) STATE BRIDGES 27 (1) SR 4007 OVER NORTH BROOK, BROOKFIELD 28 TOWNSHIP, BRIDGE REPLACEMENT 270,000 29 (BASE PROJECT ALLOCATION - $200,000) 30 (LAND ALLOCATION - $10,000) 20080S1503B2376 - 235 -
1 (DESIGN AND CONTINGENCIES - $60,000) 2 (2) SR 4035 OVER CATLIN HOLLOW CREEK, 3 CHARLESTON TOWNSHIP, BRIDGE 4 REPLACEMENT 973,000 5 (BASE PROJECT ALLOCATION - $823,000) 6 (LAND ALLOCATION - $30,000) 7 (DESIGN AND CONTINGENCIES - $120,000) 8 (3) SR 4013 OVER YARNELL RUN, DEERFIELD 9 TOWNSHIP, BRIDGE REPLACEMENT 120,000 10 (BASE PROJECT ALLOCATION - $120,000) 11 (4) SR 0287 OVER MARSH CREEK, DELMAR 12 TOWNSHIP, BRIDGE REHABILITATION 120,000 13 (BASE PROJECT ALLOCATION - $120,000) 14 (5) SR 3007 OVER WEST BRANCH OF STONYFORK 15 CREEK, DELMAR TOWNSHIP, BRIDGE 16 REPLACEMENT 190,000 17 (BASE PROJECT ALLOCATION - $120,000) 18 (LAND ALLOCATION - $20,000) 19 (DESIGN AND CONTINGENCIES - $50,000) 20 (6) SR 3019 OVER TRIBUTARY OF WILSON 21 CREEK, DELMAR TOWNSHIP, BRIDGE 22 REPLACEMENT 160,000 23 (BASE PROJECT ALLOCATION - $120,000) 24 (LAND ALLOCATION - $10,000) 25 (DESIGN AND CONTINGENCIES - $30,000) 26 (7) SR 3001 OVER BUCK RUN, ELK TOWNSHIP, 27 BRIDGE REPLACEMENT 190,000 28 (BASE PROJECT ALLOCATION - $120,000) 29 (LAND ALLOCATION - $20,000) 30 (DESIGN AND CONTINGENCIES - $50,000) 20080S1503B2376 - 236 -
1 (8) SR 4024 OVER BRANCH OF ELKHORN CREEK, 2 FARMINGTON TOWNSHIP, BRIDGE 3 REPLACEMENT 180,000 4 (BASE PROJECT ALLOCATION - $150,000) 5 (DESIGN AND CONTINGENCIES - $30,000) 6 (9) SR 0328 OVER TRIBUTARY OF BEAR CREEK, 7 JACKSON TOWNSHIP, BRIDGE 8 REHABILITATION 840,000 9 (BASE PROJECT ALLOCATION - $700,000) 10 (LAND ALLOCATION - $40,000) 11 (DESIGN AND CONTINGENCIES - $100,000) 12 (10) SR 0328 OVER BEAR CREEK, JACKSON 13 TOWNSHIP, BRIDGE REPLACEMENT 840,000 14 (BASE PROJECT ALLOCATION - $700,000) 15 (LAND ALLOCATION - $40,000) 16 (DESIGN AND CONTINGENCIES - $100,000) 17 (11) SR 0549 OVER SEELY CREEK, JACKSON 18 TOWNSHIP, BRIDGE REPLACEMENT 1,230,000 19 (BASE PROJECT ALLOCATION - $1,000,000) 20 (LAND ALLOCATION - $30,000) 21 (DESIGN AND CONTINGENCIES - $200,000) 22 (12) SR 2022 OVER WILSON CREEK, PUTNAM 23 TOWNSHIP, BRIDGE REPLACEMENT 150,000 24 (BASE PROJECT ALLOCATION - $120,000) 25 (DESIGN AND CONTINGENCIES - $30,000) 26 (13) SR 1007 OVER TRIBUTARY OF ELK RUN, 27 RUTLAND TOWNSHIP, BRIDGE REPLACEMENT 150,000 28 (BASE PROJECT ALLOCATION - $120,000) 29 (DESIGN AND CONTINGENCIES - $30,000) 30 (14) SR 3022 OVER MARSH CREEK, SHIPPEN 20080S1503B2376 - 237 -
1 TOWNSHIP, BRIDGE REHABILITATION 1,250,000 2 (BASE PROJECT ALLOCATION - $1,100,000) 3 (LAND ALLOCATION - $30,000) 4 (DESIGN AND CONTINGENCIES - $120,000) 5 (15) SR 0049, BRIDGE NO.32821 OVER 6 COWANESQUE RIVER, WESTFIELD TOWNSHIP, 7 BRIDGE REHABILITATION 240,000 8 (BASE PROJECT ALLOCATION - $240,000) 9 SECTION 64. UNION COUNTY. 10 (A) LOCAL BRIDGES (RESERVED) 11 (B) STATE BRIDGES 12 (1) SR 1003, HOFFA MILL OVER BUFFALO 13 CREEK, BUFFALO TOWNSHIP, BRIDGE 14 REPLACEMENT 877,000 15 (BASE PROJECT ALLOCATION - $727,000) 16 (LAND ALLOCATION - $30,000) 17 (DESIGN AND CONTINGENCIES - $120,000) 18 (2) SR 2007 OVER TRIBUTARY OF BULL RUN, 19 EAST BUFFALO TOWNSHIP, BRIDGE 20 REPLACEMENT 150,000 21 (BASE PROJECT ALLOCATION - $120,000) 22 (DESIGN AND CONTINGENCIES - $30,000) 23 (3) SR 1012 OVER WHITE DEER HOLE CREEK, 24 GREGG TOWNSHIP, BRIDGE REPLACEMENT 985,000 25 (BASE PROJECT ALLOCATION - $835,000) 26 (LAND ALLOCATION - $30,000) 27 (DESIGN AND CONTINGENCIES - $120,000) 28 (4) SR 3003, BRIDGE NO.33546 OVER 29 TRIBUTARY OF PENNS CREEK, HARTLETON 30 BOROUGH, BRIDGE REPLACEMENT 150,000 20080S1503B2376 - 238 -
1 (BASE PROJECT ALLOCATION - $120,000) 2 (DESIGN AND CONTINGENCIES - $30,000) 3 (5) SR 3002 OVER TRIBUTARY OF LAUREL RUN, 4 HARTLEY TOWNSHIP, BRIDGE REPLACEMENT 150,000 5 (BASE PROJECT ALLOCATION - $120,000) 6 (DESIGN AND CONTINGENCIES - $30,000) 7 (6) SR 3004, BRIDGE NO.33551 OVER 8 TRIBUTARY OF PENNS CREEK, HARTLEY 9 TOWNSHIP, BRIDGE REPLACEMENT 150,000 10 (BASE PROJECT ALLOCATION - $120,000) 11 (DESIGN AND CONTINGENCIES - $30,000) 12 (7) SR 3003, BRIDGE NO.33544 OVER 13 TRIBUTARY OF PENNS CREEK, LEWIS 14 TOWNSHIP, BRIDGE REPLACEMENT 190,000 15 (BASE PROJECT ALLOCATION - $120,000) 16 (LAND ALLOCATION - $20,000) 17 (DESIGN AND CONTINGENCIES - $50,000) 18 (8) SR 3004, BRIDGE NO.33554 OVER 19 TRIBUTARY OF PENNS CREEK, LEWIS 20 TOWNSHIP, BRIDGE REPLACEMENT 130,000 21 (BASE PROJECT ALLOCATION - $100,000) 22 (DESIGN AND CONTINGENCIES - $30,000) 23 (9) SR 3005 OVER COAL RUN, WEST BUFFALO 24 TOWNSHIP, BRIDGE REPLACEMENT 140,000 25 (BASE PROJECT ALLOCATION - $100,000) 26 (LAND ALLOCATION - $10,000) 27 (DESIGN AND CONTINGENCIES - $30,000) 28 SECTION 65. VENANGO COUNTY. 29 (A) LOCAL BRIDGES (RESERVED) 30 (B) STATE BRIDGES 20080S1503B2376 - 239 -
1 (1) SR 0008 OVER SR 0080, BARKEYVILLE 2 BOROUGH, BRIDGE REHABILITATION 2,400,000 3 (BASE PROJECT ALLOCATION - $2,300,000) 4 (DESIGN AND CONTINGENCIES - $100,000) 5 (2) SR 4018, DONATION HILL ROAD OVER 6 BEATTY RUN, CANAL TOWNSHIP, BRIDGE 7 REPLACEMENT 118,000 8 (BASE PROJECT ALLOCATION - $118,000) 9 (3) SR 6008, CENTER STREET OVER OIL CREEK, 10 CITY OF OIL CITY, BRIDGE 11 REHABILITATION 55,000 12 (BASE PROJECT ALLOCATION - $55,000) 13 (4) SR 0008 OVER BRANCH OF SLIPPERY ROCK, 14 IRWIN TOWNSHIP, BRIDGE REPLACEMENT 850,000 15 (BASE PROJECT ALLOCATION - $450,000) 16 (LAND ALLOCATION - $50,000) 17 (DESIGN AND CONTINGENCIES - $350,000) 18 (5) SR 0008 OVER SLIPPERY ROCK CREEK, 19 IRWIN TOWNSHIP, BRIDGE REHABILITATION 250,000 20 (BASE PROJECT ALLOCATION - $150,000) 21 (DESIGN AND CONTINGENCIES - $100,000) 22 (6) SR 0208 OVER MARSHALL RUN, IRWIN 23 TOWNSHIP, BRIDGE REPLACEMENT 130,000 24 (BASE PROJECT ALLOCATION - $130,000) 25 (7) SR 0062, MAIN STREET OVER LITTLE SANDY 26 CREEK, POLK BOROUGH, BRIDGE 27 REHABILITATION 17,000 28 (BASE PROJECT ALLOCATION - $17,000) 29 SECTION 66. WARREN COUNTY. 30 (A) LOCAL BRIDGES (RESERVED) 20080S1503B2376 - 240 -
1 (B) STATE BRIDGES 2 (1) SR 4003, PLANK ROAD OVER BROKENSTRAW 3 CREEK, COLUMBUS TOWNSHIP, BRIDGE 4 REHABILITATION 40,000 5 (BASE PROJECT ALLOCATION - $40,000) 6 (2) SR 4003, PLANK ROAD OVER BRANCH OF 7 BROKENSTRAW CREEK, COLUMBUS TOWNSHIP, 8 BRIDGE REHABILITATION 118,000 9 (BASE PROJECT ALLOCATION - $118,000) 10 (3) SR 1013, SCANDIA ROAD OVER FISHBURN 11 RUN, ELK TOWNSHIP, BRIDGE 12 REHABILITATION 48,000 13 (BASE PROJECT ALLOCATION - $48,000) 14 (4) SR 0069 OVER BRANCH OF JACKSON RUN, 15 FARMINGTON TOWNSHIP, BRIDGE 16 REPLACEMENT 200,000 17 (BASE PROJECT ALLOCATION - $200,000) 18 (5) SR 0957 OVER LITTLE BROKENSTRAW CREEK, 19 FREEHOLD TOWNSHIP, BRIDGE 20 REHABILITATION 54,000 21 (BASE PROJECT ALLOCATION - $54,000) 22 (6) SR 0006, DORCON ROAD OVER OTT RUN, 23 MEAD TOWNSHIP, BRIDGE REHABILITATION 34,000 24 (BASE PROJECT ALLOCATION - $34,000) 25 (7) SR 0027, GRAND STREET OVER BRANCH OF 26 GARLAND RUN, PITTSFIELD TOWNSHIP, 27 BRIDGE REPLACEMENT 170,000 28 (BASE PROJECT ALLOCATION - $170,000) 29 (8) SR 3014, COLE HILL OVER BROKENSTRAW 30 CREEK, PITTSFIELD TOWNSHIP, BRIDGE 20080S1503B2376 - 241 -
1 REHABILITATION 48,000 2 (BASE PROJECT ALLOCATION - $48,000) 3 (9) SR 2006 OVER ELKHORN RUN, PLEASANT 4 TOWNSHIP, BRIDGE REHABILITATION 575,000 5 (BASE PROJECT ALLOCATION - $500,000) 6 (DESIGN AND CONTINGENCIES - $75,000) 7 (10) SR 0666 OVER SOUTH BRANCH OF TIONESTA 8 CREEK, SHEFFIELD TOWNSHIP, BRIDGE 9 REHABILITATION 130,000 10 (BASE PROJECT ALLOCATION - $100,000) 11 (LAND ALLOCATION - $10,000) 12 (DESIGN AND CONTINGENCIES - $20,000) 13 (11) SR 0027 OVER PINE CREEK, SOUTHWEST 14 TOWNSHIP, BRIDGE REHABILITATION 48,000 15 (BASE PROJECT ALLOCATION - $48,000) 16 (12) SR 4002 OVER BRANCH OF WHITNEY RUN, 17 SPRING CREEK TOWNSHIP, BRIDGE 18 REHABILITATION 525,000 19 (BASE PROJECT ALLOCATION - $425,000) 20 (DESIGN AND CONTINGENCIES - $100,000) 21 (13) SR 4013, HIGHLAND AVENUE OVER 22 MATTHEWS RUN, YOUNGSVILLE BOROUGH, 23 BRIDGE REHABILITATION 48,000 24 (BASE PROJECT ALLOCATION - $48,000) 25 SECTION 67. WASHINGTON COUNTY. 26 (A) LOCAL BRIDGES 27 (1) JEFFERSON TOWNSHIP, HANLIN STATION 28 BRIDGE OVER HARMON CREEK, BRIDGE 29 REMOVAL 650,000 30 (BASE PROJECT ALLOCATION - $650,000) 20080S1503B2376 - 242 -
1 (2) MCDONALD BOROUGH, SR 7422, ARABELLA 2 STREET NO.02 OVER ROBBS RUN, BRIDGE 3 REPLACEMENT 225,000 4 (BASE PROJECT ALLOCATION - $135,000) 5 (LAND ALLOCATION - $30,000) 6 (DESIGN AND CONTINGENCIES - $60,000) 7 (3) PETERS TOWNSHIP, TR-723, GALLEY ROAD 8 OVER BRANCH OF CHARTIERS CREEK, BRIDGE 9 REHABILITATION 1,000,000 10 (BASE PROJECT ALLOCATION - $1,000,000) 11 (4) PETERS TOWNSHIP, TR-986, CAMP LANE 12 OVER BRUSH RUN CREEK, BRIDGE 13 REHABILITATION 1,000,000 14 (BASE PROJECT ALLOCATION - $1,000,000) 15 (5) JEFFERSON TOWNSHIP, T-4005 OVER HANLIN 16 STATION ROAD, BRIDGE REHABILITATION 500,000 17 (BASE PROJECT ALLOCATION - $500,000) 18 (B) STATE BRIDGES 19 (1) SR 2005 OVER LITTLE TENMILE CREEK, 20 AMWELL TOWNSHIP, BRIDGE REPLACEMENT 593,000 21 (BASE PROJECT ALLOCATION - $463,000) 22 (LAND ALLOCATION - $8,000) 23 (DESIGN AND CONTINGENCIES - $122,000) 24 (2) SR 4028 OVER BRANCH OF BURGETTS FORK, 25 BURGETTSTOWN BOROUGH, BRIDGE 26 REPLACEMENT 635,000 27 (BASE PROJECT ALLOCATION - $501,000) 28 (LAND ALLOCATION - $8,000) 29 (DESIGN AND CONTINGENCIES - $126,000) 30 (3) SR 1009 OVER BRANCH OF CHARTIERS 20080S1503B2376 - 243 -
1 CREEK, CANONSBURG BOROUGH, BRIDGE 2 REPLACEMENT 1,400,000 3 (BASE PROJECT ALLOCATION - $1,010,000) 4 (LAND ALLOCATION - $40,000) 5 (DESIGN AND CONTINGENCIES - $350,000) 6 (4) SR 0331, BRIDGE NO.34689 OVER BRANCH 7 OF BRUSH RUN, CANTON TOWNSHIP, BRIDGE 8 REPLACEMENT 775,000 9 (BASE PROJECT ALLOCATION - $545,000) 10 (LAND ALLOCATION - $40,000) 11 (DESIGN AND CONTINGENCIES - $190,000) 12 (5) SR 0844 OVER BRANCH OF BRUSH RUN, 13 CANTON TOWNSHIP, BRIDGE REPLACEMENT 850,000 14 (BASE PROJECT ALLOCATION - $600,000) 15 (LAND ALLOCATION - $40,000) 16 (DESIGN AND CONTINGENCIES - $210,000) 17 (6) SR 0844 OVER CHARTIERS CREEK, CANTON 18 TOWNSHIP, BRIDGE REPLACEMENT 2,180,000 19 (BASE PROJECT ALLOCATION - $1,850,000) 20 (LAND ALLOCATION - $80,000) 21 (DESIGN AND CONTINGENCIES - $250,000) 22 (7) SR 4022 OVER CHARTIERS CREEK, CANTON 23 TOWNSHIP, BRIDGE REPLACEMENT 947,000 24 (BASE PROJECT ALLOCATION - $787,000) 25 (LAND ALLOCATION - $8,000) 26 (DESIGN AND CONTINGENCIES - $152,000) 27 (8) SR 4035 OVER GEORGES RUN, CANTON 28 TOWNSHIP, BRIDGE REPLACEMENT 311,000 29 (BASE PROJECT ALLOCATION - $225,000) 30 (LAND ALLOCATION - $8,000) 20080S1503B2376 - 244 -
1 (DESIGN AND CONTINGENCIES - $78,000) 2 (9) SR 0837, BRIDGE NO.34724 OVER 3 TRIBUTARY OF MONONGAHELA RIVER, CARROLL 4 TOWNSHIP, BRIDGE REPLACEMENT 780,000 5 (BASE PROJECT ALLOCATION - $550,000) 6 (LAND ALLOCATION - $40,000) 7 (DESIGN AND CONTINGENCIES - $190,000) 8 (10) SR 1020, BRIDGE NO.34825 OVER BRANCH 9 OF TAYLORS RUN, CARROLL TOWNSHIP, 10 BRIDGE REPLACEMENT 735,000 11 (BASE PROJECT ALLOCATION - $515,000) 12 (LAND ALLOCATION - $40,000) 13 (DESIGN AND CONTINGENCIES - $180,000) 14 (11) SR 1020, BRIDGE NO.34827 OVER BRANCH 15 OF TAYLORS RUN, CARROLL TOWNSHIP, 16 BRIDGE REPLACEMENT 760,000 17 (BASE PROJECT ALLOCATION - $530,000) 18 (LAND ALLOCATION - $40,000) 19 (DESIGN AND CONTINGENCIES - $190,000) 20 (12) SR 2089 OVER TWO MILE RUN, 21 CENTERVILLE BOROUGH, BRIDGE 22 REPLACEMENT 755,000 23 (BASE PROJECT ALLOCATION - $525,000) 24 (LAND ALLOCATION - $40,000) 25 (DESIGN AND CONTINGENCIES - $190,000) 26 (13) SR 1009 OVER CHARTIERS CREEK, 27 CHARTIERS TOWNSHIP, BRIDGE REPLACEMENT 1,382,000 28 (BASE PROJECT ALLOCATION - $1,186,000) 29 (LAND ALLOCATION - $8,000) 30 (DESIGN AND CONTINGENCIES - $188,000) 20080S1503B2376 - 245 -
1 (14) SR 1045 OVER BRANCH OF CHARTIERS 2 CREEK, CHARTIERS TOWNSHIP, BRIDGE 3 REHABILITATION 1,045,000 4 (BASE PROJECT ALLOCATION - $745,000) 5 (LAND ALLOCATION - $40,000) 6 (DESIGN AND CONTINGENCIES - $260,000) 7 (15) SR 4049 OVER CHARTIERS CREEK, 8 CHARTIERS TOWNSHIP, BRIDGE REPLACEMENT 985,000 9 (BASE PROJECT ALLOCATION - $750,000) 10 (LAND ALLOCATION - $35,000) 11 (DESIGN AND CONTINGENCIES - $200,000) 12 (16) SR 0837, BRIDGE NO.34727 OVER 13 TRIBUTARY OF MONONGAHELA RIVER, CITY OF 14 MONONGAHELA, BRIDGE REPLACEMENT 655,000 15 (BASE PROJECT ALLOCATION - $455,000) 16 (LAND ALLOCATION - $40,000) 17 (DESIGN AND CONTINGENCIES - $160,000) 18 (17) SR 2063 OVER FISHPOT RUN, DEEMSTON 19 BOROUGH, BRIDGE REPLACEMENT 205,000 20 (BASE PROJECT ALLOCATION - $145,000) 21 (LAND ALLOCATION - $8,000) 22 (DESIGN AND CONTINGENCIES - $52,000) 23 (18) SR 0018 OVER SHORT CREEK, EAST FINLEY 24 TOWNSHIP, BRIDGE REPLACEMENT 810,000 25 (BASE PROJECT ALLOCATION - $570,000) 26 (LAND ALLOCATION - $40,000) 27 (DESIGN AND CONTINGENCIES - $200,000) 28 (19) SR 3017 OVER BRANCH OF SAWHILL RUN, 29 EAST FINLEY TOWNSHIP, BRIDGE 30 REPLACEMENT 560,000 20080S1503B2376 - 246 -
1 (BASE PROJECT ALLOCATION - $380,000) 2 (LAND ALLOCATION - $40,000) 3 (DESIGN AND CONTINGENCIES - $140,000) 4 (20) SR 0481 OVER SOUTH BRANCH OF MAPLE 5 CREEK, FALLOWFIELD TOWNSHIP, BRIDGE 6 REPLACEMENT 1,190,000 7 (BASE PROJECT ALLOCATION - $850,000) 8 (LAND ALLOCATION - $40,000) 9 (DESIGN AND CONTINGENCIES - $300,000) 10 (21) SR 0331, BRIDGE NO.34684 OVER BRANCH 11 OF BRUSH RUN, HOPEWELL TOWNSHIP, BRIDGE 12 REPLACEMENT 233,000 13 (BASE PROJECT ALLOCATION - $167,000) 14 (LAND ALLOCATION - $8,000) 15 (DESIGN AND CONTINGENCIES - $58,000) 16 (22) SR 0331, BRIDGE NO.34686 OVER BRANCH 17 OF BRUSH RUN, HOPEWELL TOWNSHIP, BRIDGE 18 REPLACEMENT 635,000 19 (BASE PROJECT ALLOCATION - $435,000) 20 (LAND ALLOCATION - $40,000) 21 (DESIGN AND CONTINGENCIES - $160,000) 22 (23) SR 0519 OVER BRANCH OF CHARTIERS RUN, 23 HOUSTON BOROUGH, BRIDGE REPLACEMENT 1,190,000 24 (BASE PROJECT ALLOCATION - $850,000) 25 (LAND ALLOCATION - $40,000) 26 (DESIGN AND CONTINGENCIES - $300,000) 27 (24) SR 0331 OVER WELCH RUN, INDEPENDENCE 28 TOWNSHIP, BRIDGE REPLACEMENT 1,400,000 29 (BASE PROJECT ALLOCATION - $1,000,000) 30 (LAND ALLOCATION - $50,000) 20080S1503B2376 - 247 -
1 (DESIGN AND CONTINGENCIES - $350,000) 2 (25) SR 4012 OVER ROBINSON RUN, MIDWAY 3 BOROUGH, BRIDGE REPLACEMENT 1,190,000 4 (BASE PROJECT ALLOCATION - $850,000) 5 (LAND ALLOCATION - $40,000) 6 (DESIGN AND CONTINGENCIES - $300,000) 7 (26) SR 4039 OVER MILLERS RUN, MT. 8 PLEASANT TOWNSHIP, BRIDGE REPLACEMENT 509,000 9 (BASE PROJECT ALLOCATION - $381,000) 10 (LAND ALLOCATION - $8,000) 11 (DESIGN AND CONTINGENCIES - $120,000) 12 (27) SR 0019 OVER CHARTIERS CREEK, NORTH 13 STRABANE TOWNSHIP, BRIDGE REPLACEMENT 1,160,000 14 (BASE PROJECT ALLOCATION - $830,000) 15 (LAND ALLOCATION - $40,000) 16 (DESIGN AND CONTINGENCIES - $290,000) 17 (28) SR 1059 OVER BRANCH OF MINGO CREEK, 18 NOTTINGHAM TOWNSHIP, BRIDGE 19 REPLACEMENT 1,405,000 20 (BASE PROJECT ALLOCATION - $1,000,000) 21 (LAND ALLOCATION - $55,000) 22 (DESIGN AND CONTINGENCIES - $350,000) 23 (29) SR 1006 OVER BRANCH OF PETERS CREEK, 24 PETERS TOWNSHIP, BRIDGE REPLACEMENT 1,060,000 25 (BASE PROJECT ALLOCATION - $750,000) 26 (LAND ALLOCATION - $40,000) 27 (DESIGN AND CONTINGENCIES - $270,000) 28 (30) SR 4001 OVER SAINT PATRICK RUN, 29 ROBINSON TOWNSHIP, BRIDGE REPLACEMENT 770,000 30 (BASE PROJECT ALLOCATION - $540,000) 20080S1503B2376 - 248 -
1 (LAND ALLOCATION - $40,000) 2 (DESIGN AND CONTINGENCIES - $190,000) 3 (31) SR 4019 OVER LITTLE RACCOON CREEK, 4 SMITH TOWNSHIP, BRIDGE REPLACEMENT 775,000 5 (BASE PROJECT ALLOCATION - $545,000) 6 (LAND ALLOCATION - $40,000) 7 (DESIGN AND CONTINGENCIES - $190,000) 8 (32) SR 2027 OVER SR 0070, SPEERS BOROUGH, 9 BRIDGE REPLACEMENT 1,055,000 10 (BASE PROJECT ALLOCATION - $887,000) 11 (LAND ALLOCATION - $8,000) 12 (DESIGN AND CONTINGENCIES - $160,000) 13 (33) SR 0837, BRIDGE NO.34733 OVER 14 TRIBUTARY OF MONONGAHELA RIVER, UNION 15 TOWNSHIP, BRIDGE REPLACEMENT 1,280,000 16 (BASE PROJECT ALLOCATION - $920,000) 17 (LAND ALLOCATION - $40,000) 18 (DESIGN AND CONTINGENCIES - $320,000) 19 (34) SR 8042 OVER SR 0040, WEST 20 BROWNSVILLE BOROUGH, BRIDGE 21 REPLACEMENT 769,000 22 (BASE PROJECT ALLOCATION - $625,000) 23 (LAND ALLOCATION - $8,000) 24 (DESIGN AND CONTINGENCIES - $136,000) 25 (35) SR 2041 OVER PIKE RUN, WEST FINLEY 26 TOWNSHIP, BRIDGE REPLACEMENT 1,200,000 27 (BASE PROJECT ALLOCATION - $850,000) 28 (LAND ALLOCATION - $50,000) 29 (DESIGN AND CONTINGENCIES - $300,000) 30 (36) SR 3035 OVER WHEELING CREEK, WEST 20080S1503B2376 - 249 -
1 FINLEY TOWNSHIP, BRIDGE REPLACEMENT 537,000 2 (BASE PROJECT ALLOCATION - $409,000) 3 (LAND ALLOCATION - $8,000) 4 (DESIGN AND CONTINGENCIES - $120,000) 5 (37) SR 2036 OVER PIKE RUN, WEST PIKE RUN 6 TOWNSHIP, BRIDGE REPLACEMENT 425,000 7 (BASE PROJECT ALLOCATION - $307,000) 8 (LAND ALLOCATION - $8,000) 9 (DESIGN AND CONTINGENCIES - $110,000) 10 (38) SR 2038 OVER LITTLE PIKE RUN, WEST 11 PIKE RUN TOWNSHIP, BRIDGE REPLACEMENT 730,000 12 (BASE PROJECT ALLOCATION - $510,000) 13 (LAND ALLOCATION - $40,000) 14 (DESIGN AND CONTINGENCIES - $180,000) 15 (39) SR 1006 (VENETIA ROAD) OVER PETERS 16 CREEK, BORDER OF UNION AND PETERS 17 TOWNSHIP, BRIDGE REPLACEMENT 2,000,000 18 (BASE PROJECT ALLOCATION - $1,500,000) 19 (LAND ALLOCATION - $200,000) 20 (DESIGN AND CONTINGENCIES - $300,000) 21 SECTION 68. WAYNE COUNTY. 22 (A) LOCAL BRIDGES 23 (1) BERLIN TOWNSHIP, ADAMS POND ROAD OVER 24 LAKE ESTERMERWALT, BRIDGE REPLACEMENT 100,000 25 (BASE PROJECT ALLOCATION - $100,000) 26 (2) LEBANON TOWNSHIP, GRIDLINE ROAD OVER 27 BIG BROOK, BRIDGE REPLACEMENT 413,000 28 (BASE PROJECT ALLOCATION - $344,000) 29 (DESIGN AND CONTINGENCIES - $69,000) 30 (3) HONESDALE BOROUGH, SIXTH PEDESTRIAN 20080S1503B2376 - 250 -
1 BRIDGE OVER LACKAWAXEN RIVER, BRIDGE 2 REPLACEMENT 180,000 3 (BASE PROJECT ALLOCATION - $150,000) 4 (DESIGN AND CONTINGENCIES - $30,000) 5 (4) DREHER TOWNSHIP, CREAMERY ROAD OVER 6 ROCKPORT CREEK, BRIDGE REPLACEMENT 150,000 7 (BASE PROJECT ALLOCATION - $150,000) 8 (B) STATE BRIDGES 9 (1) SR 0191 OVER DELAWARE RIVER, 10 BUCKINGHAM TOWNSHIP, BRIDGE 11 REPLACEMENT 293,000 12 (BASE PROJECT ALLOCATION - $282,000) 13 (DESIGN AND CONTINGENCIES - $11,000) 14 (2) SR 1002 OVER SOUTH BRANCH OF CALKINS 15 CREEK, DAMASCUS TOWNSHIP, BRIDGE 16 REHABILITATION 173,000 17 (BASE PROJECT ALLOCATION - $119,000) 18 (LAND ALLOCATION - $12,000) 19 (DESIGN AND CONTINGENCIES - $42,000) 20 (3) SR 0191 OVER MANNY RUN, DREHER 21 TOWNSHIP, BRIDGE REHABILITATION 38,000 22 (BASE PROJECT ALLOCATION - $26,000) 23 (LAND ALLOCATION - $3,000) 24 (DESIGN AND CONTINGENCIES - $9,000) 25 (4) SR 4035 OVER EAST LACKAWANNA RIVER, 26 PRESTON TOWNSHIP, BRIDGE 27 REHABILITATION 111,000 28 (BASE PROJECT ALLOCATION - $76,000) 29 (LAND ALLOCATION - $8,000) 30 (DESIGN AND CONTINGENCIES - $27,000) 20080S1503B2376 - 251 -
1 (5) SR 3004 OVER WEST BRANCH OF 2 WALLENPAUPACK CREEK, SALEM TOWNSHIP, 3 BRIDGE REHABILITATION 320,000 4 (BASE PROJECT ALLOCATION - $221,000) 5 (LAND ALLOCATION - $22,000) 6 (DESIGN AND CONTINGENCIES - $77,000) 7 (6) SR 4014 OVER SHADIGEE CREEK, STARRUCCA 8 BOROUGH, BRIDGE REHABILITATION 99,000 9 (BASE PROJECT ALLOCATION - $68,000) 10 (LAND ALLOCATION - $7,000) 11 (DESIGN AND CONTINGENCIES - $24,000) 12 (7) SR 3002 OVER BUTTERNUT CREEK, STERLING 13 TOWNSHIP, BRIDGE REHABILITATION 49,000 14 (BASE PROJECT ALLOCATION - $33,000) 15 (LAND ALLOCATION - $4,000) 16 (DESIGN AND CONTINGENCIES - $12,000) 17 SECTION 69. WESTMORELAND COUNTY. 18 (A) LOCAL BRIDGES 19 (1) ALLEGHENY TOWNSHIP, T-997 COPELAND 20 ROAD OVER CHARTIERS RUN, BRIDGE 21 REPLACEMENT 864,000 22 (BASE PROJECT ALLOCATION - $644,000) 23 (LAND ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $200,000) 25 (B) STATE BRIDGES 26 (1) SR 0356 OVER PINE RUN, ALLEGHENY 27 TOWNSHIP, BRIDGE REPLACEMENT 395,000 28 (BASE PROJECT ALLOCATION - $304,000) 29 (LAND ALLOCATION - $8,000) 30 (DESIGN AND CONTINGENCIES - $83,000) 20080S1503B2376 - 252 -
1 (2) SR 4034 OVER PINE RUN, ALLEGHENY 2 TOWNSHIP, BRIDGE REPLACEMENT 2,925,000 3 (BASE PROJECT ALLOCATION - $2,500,000) 4 (LAND ALLOCATION - $75,000) 5 (DESIGN AND CONTINGENCIES - $350,000) 6 (3) SR 0286 OVER BRANCH OF WOLFORD RUN, 7 BELL TOWNSHIP, BRIDGE REPLACEMENT 805,000 8 (BASE PROJECT ALLOCATION - $565,000) 9 (LAND ALLOCATION - $40,000) 10 (DESIGN AND CONTINGENCIES - $200,000) 11 (4) SR 1060, KISKIMINETAS, CONRAIL 12 RAILROAD, BELL TOWNSHIP, BRIDGE 13 REPLACEMENT 3,620,000 14 (BASE PROJECT ALLOCATION - $3,040,000) 15 (LAND ALLOCATION - $80,000) 16 (DESIGN AND CONTINGENCIES - $500,000) 17 (5) SR 0136 OVER SR 0030 AND ZELLERS RUN, 18 CITY OF GREENSBURG, BRIDGE RESTORATION 1,750,000 19 (BASE PROJECT ALLOCATION - $1,750,000) 20 (6) SR 4009 OVER BRANCH OF BRUSH CREEK, 21 CITY OF JEANNETTE, BRIDGE REPLACEMENT 1,005,000 22 (BASE PROJECT ALLOCATION - $715,000) 23 (LAND ALLOCATION - $40,000) 24 (DESIGN AND CONTINGENCIES - $250,000) 25 (7) SR 3003 OVER BRANCH OF SPEERS RUN, 26 CITY OF MONESSEN, BRIDGE REPLACEMENT 1,225,000 27 (BASE PROJECT ALLOCATION - $850,000) 28 (LAND ALLOCATION - $75,000) 29 (DESIGN AND CONTINGENCIES - $300,000) 30 (8) SR 0366 OVER SR 0056, CITY OF NEW 20080S1503B2376 - 253 -
1 KENSINGTON, BRIDGE REHABILITATION 1,187,000 2 (BASE PROJECT ALLOCATION - $1,009,000) 3 (LAND ALLOCATION - $8,000) 4 (DESIGN AND CONTINGENCIES - $170,000) 5 (9) SR 0381 OVER POWDERMILL RUN, COOK 6 TOWNSHIP, BRIDGE REPLACEMENT 1,225,000 7 (BASE PROJECT ALLOCATION - $750,000) 8 (LAND ALLOCATION - $75,000) 9 (DESIGN AND CONTINGENCIES - $400,000) 10 (10) SR 0217 OVER CONRAIL RAILROAD, DERRY 11 BOROUGH, BRIDGE REPLACEMENT 2,220,000 12 (BASE PROJECT ALLOCATION - $1,800,000) 13 (LAND ALLOCATION - $40,000) 14 (DESIGN AND CONTINGENCIES - $380,000) 15 (11) SR 0982 OVER BRANCH OF STONY RUN, 16 DERRY TOWNSHIP, BRIDGE REPLACEMENT 1,225,000 17 (BASE PROJECT ALLOCATION - $750,000) 18 (LAND ALLOCATION - $75,000) 19 (DESIGN AND CONTINGENCIES - $400,000) 20 (12) SR 1018 OVER KEYSTONE LAKE, DERRY 21 TOWNSHIP, BRIDGE REPLACEMENT 1,400,000 22 (BASE PROJECT ALLOCATION - $1,200,000) 23 (DESIGN AND CONTINGENCIES - $200,000) 24 (13) SR 0381 OVER INDIAN CREEK, DONEGAL 25 TOWNSHIP, BRIDGE REHABILITATION 2,500,000 26 (BASE PROJECT ALLOCATION - $2,000,000) 27 (LAND ALLOCATION - $100,000) 28 (DESIGN AND CONTINGENCIES - $400,000) 29 (14) SR 0381 OVER CAMP RUN, DONEGAL 30 TOWNSHIP, BRIDGE REPLACEMENT 1,225,000 20080S1503B2376 - 254 -
1 (BASE PROJECT ALLOCATION - $750,000) 2 (LAND ALLOCATION - $75,000) 3 (DESIGN AND CONTINGENCIES - $400,000) 4 (15) SR 0119 OVER JACOBS CREEK, RAILROAD, 5 EAST HUNTINGTON TOWNSHIP, BRIDGE 6 REHABILITATION 1,500,000 7 (BASE PROJECT ALLOCATION - $1,500,000) 8 (16) SR 3073 OVER BRANCH OF MEADOW RUN, 9 EAST HUNTINGTON TOWNSHIP, BRIDGE 10 REPLACEMENT 805,000 11 (BASE PROJECT ALLOCATION - $565,000) 12 (LAND ALLOCATION - $40,000) 13 (DESIGN AND CONTINGENCIES - $200,000) 14 (17) SR 3089 OVER BUFFALO RUN, EAST 15 HUNTINGTON TOWNSHIP, BRIDGE 16 REPLACEMENT 640,000 17 (BASE PROJECT ALLOCATION - $445,000) 18 (LAND ALLOCATION - $40,000) 19 (DESIGN AND CONTINGENCIES - $155,000) 20 (18) SR 0271 OVER TUBMILL RUN, FAIRFIELD 21 TOWNSHIP, BRIDGE REPLACEMENT 1,025,000 22 (BASE PROJECT ALLOCATION - $730,000) 23 (LAND ALLOCATION - $40,000) 24 (DESIGN AND CONTINGENCIES - $255,000) 25 (19) SR 1017 OVER BRANCH OF HANNAS RUN, 26 FAIRFIELD TOWNSHIP, BRIDGE REPLACEMENT 770,000 27 (BASE PROJECT ALLOCATION - $540,000) 28 (LAND ALLOCATION - $40,000) 29 (DESIGN AND CONTINGENCIES - $190,000) 30 (20) SR 0136, BRIDGE NO.36129 OVER BRANCH 20080S1503B2376 - 255 -
1 OF LITTLE SEWICKLEY CREEK, HEMPFIELD 2 TOWNSHIP, BRIDGE REPLACEMENT 1,175,000 3 (BASE PROJECT ALLOCATION - $650,000) 4 (LAND ALLOCATION - $75,000) 5 (DESIGN AND CONTINGENCIES - $450,000) 6 (21) SR 0136, BRIDGE NO.36131 OVER BRANCH 7 OF LITTLE SEWICKLEY CREEK, HEMPFIELD 8 TOWNSHIP, BRIDGE REPLACEMENT 580,000 9 (BASE PROJECT ALLOCATION - $400,000) 10 (LAND ALLOCATION - $40,000) 11 (DESIGN AND CONTINGENCIES - $140,000) 12 (22) SR 4010 OVER BRANCH OF BRUSH CREEK, 13 HEMPFIELD TOWNSHIP, BRIDGE REPLACEMENT 252,000 14 (BASE PROJECT ALLOCATION - $180,000) 15 (LAND ALLOCATION - $8,000) 16 (DESIGN AND CONTINGENCIES - $64,000) 17 (23) SR 4012 OVER BRUSH CREEK, HEMPFIELD 18 TOWNSHIP, BRIDGE REPLACEMENT 448,000 19 (BASE PROJECT ALLOCATION - $324,000) 20 (LAND ALLOCATION - $8,000) 21 (DESIGN AND CONTINGENCIES - $116,000) 22 (24) SR 0981 OVER LOYALHANNA CREEK, 23 LATROBE BOROUGH, BRIDGE REPLACEMENT 1,010,000 24 (BASE PROJECT ALLOCATION - $780,000) 25 (LAND ALLOCATION - $110,000) 26 (DESIGN AND CONTINGENCIES - $120,000) 27 (25) SR 0031 OVER BRANCH OF JACOBS CREEK, 28 MT. PLEASANT TOWNSHIP, BRIDGE 29 REPLACEMENT 1,275,000 30 (BASE PROJECT ALLOCATION - $900,000) 20080S1503B2376 - 256 -
1 (LAND ALLOCATION - $75,000) 2 (DESIGN AND CONTINGENCIES - $300,000) 3 (26) SR 0982 OVER WELTY RUN, MT. PLEASANT 4 TOWNSHIP, BRIDGE REPLACEMENT 2,100,000 5 (BASE PROJECT ALLOCATION - $1,750,000) 6 (LAND ALLOCATION - $100,000) 7 (DESIGN AND CONTINGENCIES - $250,000) 8 (27) SR 2012 OVER BRANCH OF SEWICKLEY 9 CREEK, MT. PLEASANT TOWNSHIP, BRIDGE 10 REPLACEMENT 710,000 11 (BASE PROJECT ALLOCATION - $495,000) 12 (LAND ALLOCATION - $40,000) 13 (DESIGN AND CONTINGENCIES - $175,000) 14 (28) SR 0981 OVER REPKO RUN, NEW 15 ALEXANDRIA BOROUGH, BRIDGE REPLACEMENT 657,000 16 (BASE PROJECT ALLOCATION - $545,000) 17 (LAND ALLOCATION - $8,000) 18 (DESIGN AND CONTINGENCIES - $104,000) 19 (29) SR 0993 OVER BRUSH CREEK, NORTH 20 HUNTINGDON TOWNSHIP, BRIDGE 21 REPLACEMENT 629,000 22 (BASE PROJECT ALLOCATION - $519,000) 23 (LAND ALLOCATION - $8,000) 24 (DESIGN AND CONTINGENCIES - $102,000) 25 (30) SR 3024 OVER BRANCH OF LONG RUN, 26 NORTH HUNTINGDON TOWNSHIP, BRIDGE 27 REPLACEMENT 218,000 28 (BASE PROJECT ALLOCATION - $156,000) 29 (LAND ALLOCATION - $8,000) 30 (DESIGN AND CONTINGENCIES - $54,000) 20080S1503B2376 - 257 -
1 (31) SR 3049 OVER POSSUM HOLLOW RUN, NORTH 2 HUNTINGDON TOWNSHIP, BRIDGE 3 REPLACEMENT 705,000 4 (BASE PROJECT ALLOCATION - $495,000) 5 (LAND ALLOCATION - $40,000) 6 (DESIGN AND CONTINGENCIES - $170,000) 7 (32) SR 4022 OVER BRANCH OF BRUSH RUN, 8 PENN BOROUGH, BRIDGE REPLACEMENT 313,000 9 (BASE PROJECT ALLOCATION - $225,000) 10 (LAND ALLOCATION - $8,000) 11 (DESIGN AND CONTINGENCIES - $80,000) 12 (33) SR 4022 OVER BRUSH RUN, PENN 13 TOWNSHIP, BRIDGE REPLACEMENT 640,000 14 (BASE PROJECT ALLOCATION - $445,000) 15 (LAND ALLOCATION - $40,000) 16 (DESIGN AND CONTINGENCIES - $155,000) 17 (34) SR 3015, BRIDGE NO.36556 OVER 18 TRIBUTARY OF MONONGAHELA RIVER, 19 ROSTRAVER TOWNSHIP, BRIDGE REPLACEMENT 685,000 20 (BASE PROJECT ALLOCATION - $475,000) 21 (LAND ALLOCATION - $40,000) 22 (DESIGN AND CONTINGENCIES - $170,000) 23 (35) SR 3015, BRIDGE NO.36557 OVER 24 TRIBUTARY OF MONONGAHELA RIVER, 25 ROSTRAVER TOWNSHIP, BRIDGE REPLACEMENT 535,000 26 (BASE PROJECT ALLOCATION - $365,000) 27 (LAND ALLOCATION - $40,000) 28 (DESIGN AND CONTINGENCIES - $130,000) 29 (36) SR 3017 OVER BRANCH OF CEDAR CREEK, 30 ROSTRAVER TOWNSHIP, BRIDGE REPLACEMENT 775,000 20080S1503B2376 - 258 -
1 (BASE PROJECT ALLOCATION - $545,000) 2 (LAND ALLOCATION - $40,000) 3 (DESIGN AND CONTINGENCIES - $190,000) 4 (37) SR 0819 OVER BRANCH OF JACKS RUN, 5 SALEM TOWNSHIP, BRIDGE REPLACEMENT 935,000 6 (BASE PROJECT ALLOCATION - $665,000) 7 (LAND ALLOCATION - $40,000) 8 (DESIGN AND CONTINGENCIES - $230,000) 9 (38) SR 1022 OVER CRABTREE CREEK, SALEM 10 TOWNSHIP, BRIDGE REPLACEMENT 567,000 11 (BASE PROJECT ALLOCATION - $439,000) 12 (LAND ALLOCATION - $8,000) 13 (DESIGN AND CONTINGENCIES - $120,000) 14 (39) SR 3016 OVER LITTLE SEWICKLEY CREEK, 15 SEWICKLEY TOWNSHIP, BRIDGE REPLACEMENT 693,000 16 (BASE PROJECT ALLOCATION - $555,000) 17 (LAND ALLOCATION - $8,000) 18 (DESIGN AND CONTINGENCIES - $130,000) 19 (40) SR 3016 OVER BRANCH OF SEWICKLEY 20 CREEK, SEWICKLEY TOWNSHIP, BRIDGE 21 REPLACEMENT 580,000 22 (BASE PROJECT ALLOCATION - $400,000) 23 (LAND ALLOCATION - $40,000) 24 (DESIGN AND CONTINGENCIES - $140,000) 25 (41) SR 2014 OVER SLATE CREEK, SOUTH 26 GREENSBURG BOROUGH, BRIDGE REPLACEMENT 313,000 27 (BASE PROJECT ALLOCATION - $225,000) 28 (LAND ALLOCATION - $8,000) 29 (DESIGN AND CONTINGENCIES - $80,000) 30 (42) SR 0031 OVER PAINTERS RUN, SOUTH 20080S1503B2376 - 259 -
1 HUNTINGDON TOWNSHIP, BRIDGE 2 REPLACEMENT 780,000 3 (BASE PROJECT ALLOCATION - $550,000) 4 (LAND ALLOCATION - $40,000) 5 (DESIGN AND CONTINGENCIES - $190,000) 6 (43) SR 3031 OVER SMITHTON RUN, SOUTH 7 HUNTINGDON TOWNSHIP, BRIDGE 8 REPLACEMENT 830,000 9 (BASE PROJECT ALLOCATION - $585,000) 10 (LAND ALLOCATION - $40,000) 11 (DESIGN AND CONTINGENCIES - $205,000) 12 (44) SR 0119 OVER ZELLERS RUN, SOUTHWEST 13 GREENSBURG BOROUGH, BRIDGE REPLACEMENT 1,740,000 14 (BASE PROJECT ALLOCATION - $1,250,000) 15 (LAND ALLOCATION - $40,000) 16 (DESIGN AND CONTINGENCIES - $450,000) 17 (45) SR 3103 OVER SR 0030 AND ZELLERS RUN, 18 SOUTHWEST GREENSBURG BOROUGH, BRIDGE 19 RESTORATION 1,750,000 20 (BASE PROJECT ALLOCATION - $1,750,000) 21 (46) SR 0981 OVER MONASTERY RUN, UNITY 22 TOWNSHIP, BRIDGE REPLACEMENT 674,000 23 (BASE PROJECT ALLOCATION - $538,000) 24 (LAND ALLOCATION - $8,000) 25 (DESIGN AND CONTINGENCIES - $128,000) 26 (47) SR 0982, BRIDGE NO.36330 OVER 27 NINEMILE RUN, UNITY TOWNSHIP, BRIDGE 28 REPLACEMENT 1,425,000 29 (BASE PROJECT ALLOCATION - $1,000,000) 30 (LAND ALLOCATION - $75,000) 20080S1503B2376 - 260 -
1 (DESIGN AND CONTINGENCIES - $350,000) 2 (48) SR 0982, BRIDGE NO.36332 OVER 3 NINEMILE RUN, UNITY TOWNSHIP, BRIDGE 4 REPLACEMENT 563,000 5 (BASE PROJECT ALLOCATION - $435,000) 6 (LAND ALLOCATION - $8,000) 7 (DESIGN AND CONTINGENCIES - $120,000) 8 (49) SR 1022 OVER TRIBUTARY OF LOYALHANNA 9 CREEK, UNITY TOWNSHIP, BRIDGE 10 REPLACEMENT 720,000 11 (BASE PROJECT ALLOCATION - $500,000) 12 (LAND ALLOCATION - $40,000) 13 (DESIGN AND CONTINGENCIES - $180,000) 14 (50) SR 2017 OVER BRANCH OF SEWICKLEY 15 CREEK, UNITY TOWNSHIP, BRIDGE 16 REPLACEMENT 920,000 17 (BASE PROJECT ALLOCATION - $650,000) 18 (LAND ALLOCATION - $40,000) 19 (DESIGN AND CONTINGENCIES - $230,000) 20 (51) SR 2023 OVER BRANCH OF SEWICKLEY 21 CREEK, UNITY TOWNSHIP, BRIDGE 22 REPLACEMENT 775,000 23 (BASE PROJECT ALLOCATION - $545,000) 24 (LAND ALLOCATION - $40,000) 25 (DESIGN AND CONTINGENCIES - $190,000) 26 (52) SR 2027 OVER BRANCH OF NINEMILE RUN, 27 UNITY TOWNSHIP, BRIDGE REPLACEMENT 2,500,000 28 (BASE PROJECT ALLOCATION - $2,100,000) 29 (LAND ALLOCATION - $50,000) 30 (DESIGN AND CONTINGENCIES - $350,000) 20080S1503B2376 - 261 -
1 (53) SR 0366 OVER PUCKETA CREEK, UPPER 2 BURRELL TOWNSHIP, BRIDGE REPLACEMENT 350,000 3 (BASE PROJECT ALLOCATION - $350,000) 4 (54) SR 4067 OVER BRANCH OF PINE RUN, 5 WASHINGTON TOWNSHIP, BRIDGE 6 REPLACEMENT 580,000 7 (BASE PROJECT ALLOCATION - $400,000) 8 (LAND ALLOCATION - $40,000) 9 (DESIGN AND CONTINGENCIES - $140,000) 10 (55) SR 0136 OVER YOUGHIOGHENY RIVER, WEST 11 NEWTON BOROUGH, BRIDGE REPLACEMENT 3,080,000 12 (BASE PROJECT ALLOCATION - $2,600,000) 13 (LAND ALLOCATION - $80,000) 14 (DESIGN AND CONTINGENCIES - $400,000) 15 SECTION 70. WYOMING COUNTY. 16 (A) LOCAL BRIDGES 17 (1) EATON TOWNSHIP, T-391, JENKS ROAD OVER 18 MARCH CREEK, BRIDGE REHABILITATION 77,000 19 (BASE PROJECT ALLOCATION - $70,000) 20 (DESIGN AND CONTINGENCIES - $7,000) 21 (2) MONROE TOWNSHIP, T-337 OVER LEONARD 22 CREEK, BRIDGE REPLACEMENT 925,000 23 (BASE PROJECT ALLOCATION - $760,000) 24 (LAND ALLOCATION - $50,000) 25 (DESIGN AND CONTINGENCIES - $115,000) 26 (3) TUNKHANNOCK BOROUGH, AVERY STREET OVER 27 UNNAMED TRIBUTARY OF SWALE BROOK, 28 BRIDGE REHABILITATION 50,000 29 (BASE PROJECT ALLOCATION - $38,000) 30 (DESIGN AND CONTINGENCIES - $12,000) 20080S1503B2376 - 262 -
1 (4) TUNKHANNOCK BOROUGH, NORTH BRIDGE 2 STREET NO.1 OVER UNNAMED TRIBUTARY OF 3 SWALE BROOK, BRIDGE REHABILITATION 45,000 4 (BASE PROJECT ALLOCATION - $30,000) 5 (LAND ALLOCATION - $2,000) 6 (DESIGN AND CONTINGENCIES - $13,000) 7 (5) TUNKHANNOCK BOROUGH, NORTH BRIDGE 8 STREET NO.2 OVER UNNAMED TRIBUTARY OF 9 SWALE BROOK, BRIDGE REPLACEMENT 150,000 10 (BASE PROJECT ALLOCATION - $110,000) 11 (LAND ALLOCATION - $5,000) 12 (DESIGN AND CONTINGENCIES - $35,000) 13 (6) TUNKHANNOCK BOROUGH, EAST HARRISON 14 STREET OVER SWALE BROOK, BRIDGE 15 REPLACEMENT 125,000 16 (BASE PROJECT ALLOCATION - $90,000) 17 (LAND ALLOCATION - $5,000) 18 (DESIGN AND CONTINGENCIES - $30,000) 19 (7) TUNKHANNOCK BOROUGH, MCCORD STREET, 20 OVER SWALE BROOK, BRIDGE 21 REHABILITATION 33,000 22 (BASE PROJECT ALLOCATION - $25,000) 23 (DESIGN AND CONTINGENCIES - $8,000) 24 (B) STATE BRIDGES 25 (1) SR 2007 OVER TRIBUTARY OF SUSQUEHANNA 26 RIVER, EATON TOWNSHIP, BRIDGE 27 REHABILITATION 360,000 28 (BASE PROJECT ALLOCATION - $248,000) 29 (LAND ALLOCATION - $25,000) 30 (DESIGN AND CONTINGENCIES - $87,000) 20080S1503B2376 - 263 -
1 (2) SR 2007 OVER PENNY CREEK, EATON 2 TOWNSHIP, BRIDGE REHABILITATION 84,000 3 (BASE PROJECT ALLOCATION - $58,000) 4 (LAND ALLOCATION - $6,000) 5 (DESIGN AND CONTINGENCIES - $20,000) 6 (3) SR 0087 OVER LITTLE MEHOOPANY CREEK, 7 MEHOOPANY TOWNSHIP, BRIDGE 8 REHABILITATION 36,000 9 (BASE PROJECT ALLOCATION - $24,000) 10 (LAND ALLOCATION - $3,000) 11 (DESIGN AND CONTINGENCIES - $9,000) 12 (4) SR 4002 OVER LITTLE MEHOOPANY CREEK, 13 MEHOOPANY TOWNSHIP, BRIDGE REPLACEMENT 1,415,000 14 (BASE PROJECT ALLOCATION - $1,100,000) 15 (LAND ALLOCATION - $90,000) 16 (DESIGN AND CONTINGENCIES - $225,000) 17 (5) SR 4005 OVER TRIBUTARY OF MEHOOPANY 18 CREEK, MEHOOPANY TOWNSHIP, BRIDGE 19 REPLACEMENT 960,000 20 (BASE PROJECT ALLOCATION - $800,000) 21 (LAND ALLOCATION - $60,000) 22 (DESIGN AND CONTINGENCIES - $100,000) 23 (6) SR 0006, TR 6 OVER MESHOPPEN CREEK, 24 MESHOPPEN BOROUGH, BRIDGE 25 REHABILITATION 1,166,000 26 (BASE PROJECT ALLOCATION - $866,000) 27 (DESIGN AND CONTINGENCIES - $300,000) 28 (7) SR 0029 OVER ROARING RUN CREEK, MONROE 29 TOWNSHIP, BRIDGE REHABILITATION 122,000 30 (BASE PROJECT ALLOCATION - $84,000) 20080S1503B2376 - 264 -
1 (LAND ALLOCATION - $9,000) 2 (DESIGN AND CONTINGENCIES - $29,000) 3 (8) SR 0092, TR 92 OVER TRIBUTARY OF 4 TUNKHANNOCK CREEK, NICHOLSON TOWNSHIP, 5 BRIDGE REHABILITATION 400,000 6 (BASE PROJECT ALLOCATION - $200,000) 7 (DESIGN AND CONTINGENCIES - $200,000) 8 (9) SR 1027 OVER WILLOW BROOK, NICHOLSON 9 TOWNSHIP, BRIDGE REHABILITATION 64,000 10 (BASE PROJECT ALLOCATION - $44,000) 11 (LAND ALLOCATION - $5,000) 12 (DESIGN AND CONTINGENCIES - $15,000) 13 SECTION 71. YORK COUNTY. 14 (A) LOCAL BRIDGES 15 (1) FRANKLIN TOWNSHIP, RIDGE ROAD OVER 16 NORTH BRANCH OF BERMUDIAN CREEK, BRIDGE 17 REPLACEMENT 66,000 18 (BASE PROJECT ALLOCATION - $66,000) 19 (2) HELLAM TOWNSHIP, COOL SPRINGS ROAD 20 OVER SR 0030, BRIDGE REHABILITATION 2,376,000 21 (BASE PROJECT ALLOCATION - $2,376,000) 22 (B) STATE BRIDGES 23 (1) SR 0216 OVER PIERCEVILLE RUN, CODORUS 24 TOWNSHIP, BRIDGE REPLACEMENT 420,000 25 (BASE PROJECT ALLOCATION - $300,000) 26 (LAND ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $100,000) 28 (2) SR 3053 OVER MILL RACE, HEIDELBERG 29 TOWNSHIP, BRIDGE REPLACEMENT 420,000 30 (BASE PROJECT ALLOCATION - $300,000) 20080S1503B2376 - 265 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $100,000) 3 (3) SR 0030, LINCOLN HIGHWAY OVER PARADISE 4 CREEK, JACKSON TOWNSHIP, BRIDGE 5 REPLACEMENT 420,000 6 (BASE PROJECT ALLOCATION - $300,000) 7 (LAND ALLOCATION - $20,000) 8 (DESIGN AND CONTINGENCIES - $100,000) 9 (4) SR 0030, LINCOLN HIGHWAY OVER LITTLE 10 CONEWAGO CREEK, JACKSON TOWNSHIP, 11 BRIDGE REPLACEMENT 420,000 12 (BASE PROJECT ALLOCATION - $300,000) 13 (LAND ALLOCATION - $20,000) 14 (DESIGN AND CONTINGENCIES - $100,000) 15 (5) SR 3058 OVER GUNPOWDER FALLS CREEK, 16 MANHEIM TOWNSHIP, BRIDGE REPLACEMENT 97,000 17 (BASE PROJECT ALLOCATION - $97,000) 18 (6) SR 3074 OVER TRIBUTARY OF CODORUS 19 CREEK, MANHEIM TOWNSHIP, BRIDGE 20 REPLACEMENT 1,164,000 21 (BASE PROJECT ALLOCATION - $650,000) 22 (LAND ALLOCATION - $70,000) 23 (DESIGN AND CONTINGENCIES - $444,000) 24 (7) SR 4009, YORK ROAD OVER BENNETT RUN, 25 NEWBERRY TOWNSHIP, BRIDGE 26 REHABILITATION 1,000,000 27 (BASE PROJECT ALLOCATION - $420,000) 28 (DESIGN AND CONTINGENCIES - $580,000) 29 (8) SR 3017, REYNOLDS MILL OVER EAST 30 BRANCH OF CODORUS CREEK, NORTH CODORUS 20080S1503B2376 - 266 -
1 TOWNSHIP, BRIDGE REHABILITATION 3,440,000 2 (BASE PROJECT ALLOCATION - $1,640,000) 3 (DESIGN AND CONTINGENCIES - $1,800,000) 4 (9) SR 3044 OVER WEST BRANCH OF CODORUS 5 CREEK, NORTH CODORUS TOWNSHIP, BRIDGE 6 REHABILITATION 3,090,000 7 (BASE PROJECT ALLOCATION - $1,440,000) 8 (DESIGN AND CONTINGENCIES - $1,650,000) 9 (10) SR 3053 OVER WEST BRANCH OF CODORUS 10 CREEK, NORTH CODORUS TOWNSHIP, BRIDGE 11 REPLACEMENT 420,000 12 (BASE PROJECT ALLOCATION - $300,000) 13 (LAND ALLOCATION - $20,000) 14 (DESIGN AND CONTINGENCIES - $100,000) 15 (11) SR 3046, WEST COLLEGE AVENUE, OVER 16 WEST BRANCH OF CODORUS CREEK, NORTH 17 CODORUS TOWNSHIP, BRIDGE 18 REHABILITATION 2,350,000 19 (BASE PROJECT ALLOCATION - $1,070,000) 20 (DESIGN AND CONTINGENCIES - $1,280,000) 21 (12) SR 3073 OVER TRIBUTARY OF PLUM CREEK, 22 PENN TOWNSHIP, BRIDGE REPLACEMENT 97,000 23 (BASE PROJECT ALLOCATION - $97,000) 24 (13) I-83 OVER YORK RAILROAD AND CODORUS 25 CREEK, SPRING GARDEN TOWNSHIP, BRIDGE 26 REHABILITATION 1,200,000 27 (BASE PROJECT ALLOCATION - $810,000) 28 (LAND ALLOCATION - $20,000) 29 (DESIGN AND CONTINGENCIES - $370,000) 30 (14) SR 2017 OVER TRIBUTARY OF CABIN 20080S1503B2376 - 267 -
1 CREEK, SPRINGETTSBURY TOWNSHIP, BRIDGE 2 REPLACEMENT 222,000 3 (LAND ALLOCATION - $25,000) 4 (DESIGN AND CONTINGENCIES - $197,000) 5 (15) SR 2017 OVER KREUTZ CREEK, 6 SPRINGETTSBURY TOWNSHIP, BRIDGE 7 REPLACEMENT 222,000 8 (LAND ALLOCATION - $25,000) 9 (DESIGN AND CONTINGENCIES - $197,000) 10 (16) I-83 OVER SR 2068, SPRINGFIELD 11 TOWNSHIP, BRIDGE REHABILITATION 295,000 12 (BASE PROJECT ALLOCATION - $110,000) 13 (LAND ALLOCATION - $20,000) 14 (DESIGN AND CONTINGENCIES - $165,000) 15 (17) I-83 OVER PA 214 AND SR 0214, 16 SPRINGFIELD TOWNSHIP, BRIDGE 17 REHABILITATION 147,000 18 (BASE PROJECT ALLOCATION - $55,000) 19 (LAND ALLOCATION - $10,000) 20 (DESIGN AND CONTINGENCIES - $82,000) 21 (18) SR 3100, NORTH STREET OVER I-83, 22 SPRINGFIELD TOWNSHIP, BRIDGE 23 REHABILITATION 420,000 24 (BASE PROJECT ALLOCATION - $300,000) 25 (LAND ALLOCATION - $20,000) 26 (DESIGN AND CONTINGENCIES - $100,000) 27 (19) SR 0182 OVER TRIBUTARY OF SOUTH 28 BRANCH OF CODORUS CREEK, SPRINGFIELD 29 TOWNSHIP, BRIDGE REPLACEMENT 420,000 30 (BASE PROJECT ALLOCATION - $300,000) 20080S1503B2376 - 268 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $100,000) 3 (20) SR 3020 OVER TRIBUTARY OF SOUTH 4 BRANCH OF CODORUS CREEK, SPRINGFIELD 5 TOWNSHIP, BRIDGE REPLACEMENT 97,000 6 (BASE PROJECT ALLOCATION - $97,000) 7 (21) SR 0194, BALTIMORE ROAD OVER REYNOLDS 8 RUN, WASHINGTON TOWNSHIP, BRIDGE 9 REPLACEMENT 750,000 10 (BASE PROJECT ALLOCATION - $750,000) 11 (22) SR 4008, DAVIDSBURG ROAD OVER RED 12 RUN, WASHINGTON TOWNSHIP, BRIDGE 13 REHABILITATION 500,000 14 (BASE PROJECT ALLOCATION - $500,000) 15 (23) SR 4012, WELLSVILLE ROAD OVER DOE 16 RUN, WASHINGTON TOWNSHIP, BRIDGE 17 REPLACEMENT 420,000 18 (BASE PROJECT ALLOCATION - $300,000) 19 (LAND ALLOCATION - $20,000) 20 (DESIGN AND CONTINGENCIES - $100,000) 21 (24) SR 0462, WEST MARKET STREET OVER 22 TRIBUTARY OF CODORUS CREEK, WEST 23 MANCHESTER TOWNSHIP, BRIDGE 24 REPLACEMENT 420,000 25 (BASE PROJECT ALLOCATION - $300,000) 26 (LAND ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $100,000) 28 (25) SR 3046, HIGHLAND AVENUE OVER YORK 29 RAILROAD, WEST YORK BOROUGH, BRIDGE 30 REHABILITATION 2,000,000 20080S1503B2376 - 269 -
1 (BASE PROJECT ALLOCATION - $2,000,000) 2 (26) SR 1015 OVER TRIBUTARY OF SUSQUEHANNA 3 RIVER, YORK HAVEN BOROUGH, BRIDGE 4 REPLACEMENT 97,000 5 (BASE PROJECT ALLOCATION - $97,000) 6 (27) I-83 OVER LAKE REDMANS CREEK, YORK 7 TOWNSHIP, BRIDGE REHABILITATION 147,000 8 (BASE PROJECT ALLOCATION - $55,000) 9 (LAND ALLOCATION - $10,000) 10 (DESIGN AND CONTINGENCIES - $82,000) 11 SECTION 72. MISCELLANEOUS. 12 (1) DCNR BRIDGES OVER VARIOUS SPANS, 13 VARIOUS TOWNSHIPS, BRIDGE REPLACEMENT 5,000,000 14 (DESIGN AND CONTINGENCIES - $5,000,000) 15 SECTION 73. LIMITATION ON EXPENDITURE OF FUNDS. 16 THE FOLLOWING SHALL APPLY: 17 (1) ANY MONEYS DERIVED FROM THE INCURRING OF DEBT SHALL 18 BE USED SOLELY FOR EFFECTING THE REHABILITATION, REPLACEMENT 19 OR REMOVAL OF BRIDGES LOCATED ON STATE HIGHWAYS. ALL OTHER 20 BRIDGE REHABILITATION, REPLACEMENT OR REMOVAL SHALL BE 21 FINANCED FROM CURRENT REVENUE. 22 (2) NOTWITHSTANDING ANY LAW TO THE CONTRARY, THE 23 PROJECTS ITEMIZED IN THE ACT OF DECEMBER 8, 1982 (P.L.848, 24 NO.235), KNOWN AS THE HIGHWAY-RAILROAD AND HIGHWAY BRIDGE 25 CAPITAL BUDGET ACT FOR 1982-1983, MAY BE FINANCED FROM 26 CURRENT REVENUE. 27 SECTION 74. DEBT AUTHORIZATION. 28 THE GOVERNOR, AUDITOR GENERAL AND STATE TREASURER ARE HEREBY 29 AUTHORIZED AND DIRECTED TO BORROW FROM TIME TO TIME, IN ADDITION 30 TO ANY AUTHORIZATION HERETOFORE OR HEREAFTER ENACTED, ON THE 20080S1503B2376 - 270 -
1 CREDIT OF THE COMMONWEALTH, SUBJECT TO THE LIMITATIONS PROVIDED 2 IN THE CURRENT CAPITAL BUDGET, MONEY NOT EXCEEDING IN THE 3 AGGREGATE THE SUM OF $1,150,048,000 AS MAY BE FOUND NECESSARY TO 4 CARRY OUT THE ACQUISITION AND CONSTRUCTION OF THE STATE PROJECTS 5 SPECIFICALLY ITEMIZED IN THIS ACT. 6 SECTION 75. ISSUE OF BONDS. 7 THE INDEBTEDNESS AUTHORIZED IN THIS ACT SHALL BE INCURRED 8 FROM TIME TO TIME AND SHALL BE EVIDENCED BY ONE OR MORE SERIES 9 OF GENERAL OBLIGATION BONDS OF THE COMMONWEALTH IN SUCH 10 AGGREGATE PRINCIPAL AMOUNT FOR EACH SERIES AS THE GOVERNOR, 11 AUDITOR GENERAL AND STATE TREASURER SHALL DETERMINE, BUT THE 12 LATEST STATED MATURITY DATE SHALL NOT EXCEED 30 YEARS FROM THE 13 DATE OF THE BOND FIRST ISSUED FOR EACH SERIES. 14 SECTION 76. ESTIMATED USEFUL LIFE OF PROJECTS. 15 THE GENERAL ASSEMBLY STATES THE ESTIMATED USEFUL LIFE OF THE 16 PROJECTS ITEMIZED IN THIS ACT AS 30 YEARS. 17 SECTION 77. APPROPRIATION. 18 THE NET PROCEEDS OF THE SALE OF THE OBLIGATIONS AUTHORIZED IN 19 THIS ACT ARE HEREBY APPROPRIATED FROM THE CAPITAL FACILITIES 20 FUND TO THE DEPARTMENT IN THE MAXIMUM AMOUNT OF $1,150,048,000 21 TO BE USED BY IT EXCLUSIVELY TO DEFRAY THE FINANCIAL COSTS OF 22 THE STATE PROJECTS SPECIFICALLY ITEMIZED IN THIS CAPITAL BUDGET. 23 AFTER RESERVING OR PAYING THE EXPENSES OF THE SALE OF THE 24 OBLIGATION, THE STATE TREASURER SHALL PAY OUT TO THE DEPARTMENT 25 THE MONEYS AS REQUIRED AND CERTIFIED BY IT TO BE LEGALLY DUE AND 26 PAYABLE. 27 SECTION 78. FEDERAL FUNDS. 28 IN ADDITION TO THOSE FUNDS APPROPRIATED IN SECTION 77, ALL 29 MONEYS RECEIVED FROM THE FEDERAL GOVERNMENT FOR THE PUBLIC 30 IMPROVEMENT PROJECTS SPECIFICALLY ITEMIZED IN THIS ACT ARE ALSO 20080S1503B2376 - 271 -
1 HEREBY APPROPRIATED FOR THOSE PROJECTS. 2 SECTION 79. ALLOCATION OF FUNDS. 3 (A) GENERAL RULE.--WHENEVER THE DEPARTMENT OR THE DEPARTMENT 4 OF CONSERVATION AND NATURAL RESOURCES DETERMINES THAT THE FULL 5 ESTIMATED FINANCIAL COSTS OF THE PROJECTS ITEMIZED IN THIS ACT 6 ARE NOT NECESSARY FOR THE PROPER DESIGN, ACQUISITION OR 7 CONSTRUCTION OF SUCH PROJECTS, THE EXCESS FUNDS NO LONGER 8 REQUIRED MAY BE ALLOCATED BY THE DEPARTMENT OR THE DEPARTMENT OF 9 CONSERVATION AND NATURAL RESOURCES TO INCREASE THE ESTIMATED 10 COSTS OF ANY ONE OR MORE OF THE PROJECTS SPECIFICALLY ITEMIZED 11 IN A CAPITAL BUDGET. 12 (B) REIMBURSEMENT OF MUNICIPAL EXPENDITURES.--MONEYS RAISED 13 OR EXPENDED BY MUNICIPALITIES AFTER THE EFFECTIVE DATE OF THIS 14 ACT, IN ANTICIPATION OF RECEIPT OF FUNDS AUTHORIZED FOR PROJECTS 15 ITEMIZED BY THIS ACT, MAY BE REIMBURSABLE TO THOSE 16 MUNICIPALITIES. 17 SECTION 80. POLICY ON JOBS AND MATERIALS. 18 (A) JOBS.--IT IS THE DECLARED POLICY OF THE COMMONWEALTH 19 THAT THE CONSTRUCTION PROJECTS AUTHORIZED IN THIS ACT BE USED, 20 TO THE GREATEST EXTENT POSSIBLE, TO PROVIDE FOR THE CREATION OF 21 JOBS AND THE REHIRING OF THE UNEMPLOYED IN THIS COMMONWEALTH. IN 22 ORDER TO REACH THIS GOAL, FIRMS WITH COMMONWEALTH-BASED 23 FACILITIES SHALL BE ACTIVELY SOLICITED TO MAKE BIDS ON CONTRACTS 24 TO FURNISH PRODUCTS AND MATERIALS, INCLUDING, BUT NOT LIMITED 25 TO, STEEL AND STEEL PRODUCTS, TO BE USED IN THESE PROJECTS. 26 (B) MATERIALS.--EVERY CONTRACT DOCUMENT ENTERED INTO TO 27 UNDERTAKE A PROJECT CONTAINED IN THIS ACT SHALL PROVIDE THAT ANY 28 STEEL OR OTHER PRODUCTS TO BE USED OR SUPPLIED IN THE 29 PERFORMANCE OF THIS CONTRACT SHALL BE REQUIRED TO BE 30 MANUFACTURED BY PLANTS IN THE UNITED STATES UNLESS THE SECRETARY 20080S1503B2376 - 272 -
1 DETERMINES, ON A CONTRACT BY CONTRACT BASIS, THAT CERTAIN 2 REQUIRED PRODUCTS ARE NOT PRODUCED IN THE UNITED STATES IN 3 SUFFICIENT QUANTITIES TO MEET THE REQUIREMENTS OF THE CONTRACT. 4 SUCH A DETERMINATION AND THE REASONS THEREFOR SHALL BE PUBLISHED 5 IN THE PENNSYLVANIA BULLETIN. DECISIONS MADE UNDER THIS 6 SUBSECTION SHALL NOT BE INCONSISTENT WITH THE GENERAL PROVISIONS 7 OF THE ACT OF MARCH 3, 1978 (P.L.6, NO.3), KNOWN AS THE STEEL 8 PRODUCTS PROCUREMENT ACT. 9 (C) MINORITIES AND WOMEN.--IT IS ALSO THE DECLARED POLICY OF 10 THE COMMONWEALTH TO REQUIRE AND ENCOURAGE SUBSTANTIAL 11 PARTICIPATION BY MINORITIES AND WOMEN IN THE CONSTRUCTION 12 PROJECTS AUTHORIZED BY THIS ACT. 13 SECTION 81. PAYMENT OF CAPITAL DEBT SERVICE. 14 THE REPAYMENT OF ANY DEBT INCURRED PURSUANT TO THIS ACT SHALL 15 BE MADE FROM THE ACCOUNT AND SUCH REPAYMENT SHALL HAVE FIRST 16 CLAIM ON THE REVENUES OF THE ACCOUNT. 17 SECTION 82. AUTHORIZATION AND DEBT CUMULATION. 18 THE ADDITIONAL AUTHORIZATION AND DEBT ALLOWANCE PROVIDED FOR 19 IN THIS ACT SHALL BE ADDED TO THE TOTAL AUTHORIZATIONS AND DEBT 20 INCURRED PURSUANT TO THE ACT OF DECEMBER 8, 1982 (P.L.848, 21 NO.235), KNOWN AS THE HIGHWAY-RAILROAD AND HIGHWAY BRIDGE 22 CAPITAL BUDGET ACT FOR 1982-1983, AS AMENDED AND SUPPLEMENTED. 23 SECTION 83. EDITORIAL CHANGES. 24 IN EDITING AND PREPARING THIS ACT FOR PRINTING FOLLOWING THE 25 FINAL ENACTMENT, THE LEGISLATIVE REFERENCE BUREAU SHALL INSERT 26 OR REVISE LETTERS OR NUMBERS FOR PROJECTS WHERE THE LETTERS OR 27 NUMBERS ARE MISSING OR REQUIRE REVISION. THE BUREAU SHALL ALSO 28 REVISE THE TOTAL MONETARY AMOUNTS FOR THE TOTAL AUTHORIZATION, 29 DEBT AUTHORIZATION, APPROPRIATIONS AND DEPARTMENTAL TOTALS AS 30 NECESSARY TO AGREE WITH THE TOTAL MONETARY AMOUNTS OF THE 20080S1503B2376 - 273 -
1 PROJECTS. 2 SECTION 84. EFFECTIVE DATE. 3 THIS ACT SHALL TAKE EFFECT IMMEDIATELY. F13L86RLE/20080S1503B2376 - 274 -