THE GENERAL ASSEMBLY OF PENNSYLVANIA


SENATE BILL

No. 798 Session of 2007


        INTRODUCED BY ARMSTRONG, APRIL 24, 2007

        AS AMENDED, COMMITTEE ON APPROPRIATIONS, HOUSE OF
           REPRESENTATIVES, JULY 14, 2007

                                     AN ACT

     1  Providing for the capital budget for the fiscal year 2007-2008;   <--
     2     ITEMIZING PUBLIC IMPROVEMENT PROJECTS AND FURNITURE AND
     3     EQUIPMENT PROJECTS TO BE CONSTRUCTED OR ACQUIRED OR ASSISTED
     4     BY THE DEPARTMENT OF GENERAL SERVICES, TOGETHER WITH THEIR
     5     ESTIMATED FINANCIAL COSTS; AUTHORIZING THE INCURRING OF DEBT
     6     WITHOUT THE APPROVAL OF THE ELECTORS FOR THE PURPOSE OF
     7     FINANCING THE PROJECTS TO BE CONSTRUCTED, ACQUIRED OR
     8     ASSISTED BY THE DEPARTMENT OF GENERAL SERVICES; STATING THE
     9     ESTIMATED USEFUL LIFE OF THE PROJECTS; PROVIDING FOR SPECIAL
    10     PROVISIONS FOR CERTAIN PROJECTS; AND MAKING APPROPRIATIONS.

    11     The General Assembly of the Commonwealth of Pennsylvania
    12  hereby enacts as follows:
    13  Section 1.  Short title and construction.
    14     (a)  Short title.--This act shall be known and may be cited
    15  as the Capital Budget AUTHORIZATION AND PUBLIC IMPROVEMENT        <--
    16  PROJECT ITEMIZATION Act of 2007-2008.
    17     (b)  Supplements.--A reference to this act shall be deemed to
    18  include a reference to the supplements to this act.
    19     (c)  Capital Facilities Debt Enabling Act.--The provisions
    20  and definitions of Chapter 3 of the act of February 9, 1999

     1  (P.L.1, No.1), known as The THE Capital Facilities Debt Enabling  <--
     2  Act, shall apply to this act to the extent they are not
     3  inconsistent with this act.
     4  Section 2.  Overall limitations on debt to be incurred for
     5                 capital projects.
     6     The maximum principal amount of additional debt to be
     7  incurred during the 2007-2008 fiscal year, AND THEREAFTER UNTIL   <--
     8  THE ENACTMENT OF THE 2008-2009 CAPITAL BUDGET SPECIFYING THE
     9  MAXIMUM DEBT FOR THE 2008-2009 FISCAL YEAR, for capital projects
    10  specifically itemized in a capital budget pursuant to section
    11  7(a)(4) of Article VIII of the Constitution of Pennsylvania, and
    12  the fund to be charged with the repayment of such debt, shall,
    13  with respect to each category of capital projects, be as
    14  follows:
    15                Category              Amount          Fund
    16  (1)  Public Improvement
    17     Projects:
    18     (i)  Buildings and                            General Fund or
    19         Structures               $320,000,000     Special Fund as
    20                                                   applicable
    21  (2)  Furniture and                               General Fund or
    22     Equipment                    25,000,000       Special Fund as
    23                                                   applicable
    24  (3)  Transportation
    25     Assistance Projects           150,000,000     General Fund
    26  (4)  Redevelopment
    27     Assistance Projects           250,000,000     General Fund
    28  (5)  Flood Control
    29     Projects                       7,000,000      General Fund
    30     Total                        $752,000,000
    20070S0798B1311                  - 2 -     

     1  Section 3.  Payment of settlement or awards of claims.
     2     Notwithstanding the provisions of 62 Pa.C.S. § 1726 (relating
     3  to payment of awards and costs), for fiscal year 2007-2008 the
     4  settlement or award of claims arising from construction
     5  contracts for public improvement projects may be paid by the
     6  Department of General Services from available funds in accounts
     7  within the Capital Facilities Fund that include funds no longer
     8  required for the design, acquisition or construction of any
     9  approved capital project.
    10  SECTION 4.  TOTAL AUTHORIZATIONS.                                 <--
    11     (A)  PUBLIC IMPROVEMENTS.--THE TOTAL AUTHORIZATION FOR THE
    12  ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC
    13  IMPROVEMENT PROJECTS ITEMIZED IN SECTION 5 AND TO BE ACQUIRED OR
    14  CONSTRUCTED BY THE DEPARTMENT OF GENERAL SERVICES, ITS
    15  SUCCESSORS OR ASSIGNS AND TO BE FINANCED BY THE INCURRING OF
    16  DEBT SHALL BE $681,500,000 $881,500,000.                          <--
    17     (B)  FURNITURE AND EQUIPMENT.--THE TOTAL AUTHORIZATION FOR
    18  THE ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC
    19  IMPROVEMENT PROJECTS CONSISTING OF THE ACQUISITION OF ORIGINAL
    20  MOVABLE FURNITURE AND EQUIPMENT TO COMPLETE PUBLIC IMPROVEMENT
    21  PROJECTS ITEMIZED IN SECTION 6 AND TO BE ACQUIRED BY THE
    22  DEPARTMENT OF GENERAL SERVICES, ITS SUCCESSORS OR ASSIGNS AND TO
    23  BE FINANCED BY THE INCURRING OF DEBT SHALL BE $19,500,000         <--
    24  $26,000,000.                                                      <--
    25     (C)  GENERAL FUND CURRENT REVENUE PROJECTS.--THE TOTAL
    26  AUTHORIZATION FOR THE CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC
    27  IMPROVEMENT PROJECTS ITEMIZED IN SECTION 7 AND TO BE DEVELOPED
    28  OR CONSTRUCTED BY THE DEPARTMENT OF GENERAL SERVICES, ITS
    29  SUCCESSORS OR ASSIGNS AND TO BE FINANCED FROM CURRENT REVENUES
    30  IN THE GENERAL FUND SHALL BE $25,500,000.
    20070S0798B1311                  - 3 -     

     1  SECTION 5.  ITEMIZATION OF PUBLIC IMPROVEMENT CAPITAL PROJECTS.
     2     ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC
     3  IMPROVEMENT PROJECTS TO BE CONSTRUCTED OR ACQUIRED BY THE
     4  DEPARTMENT OF GENERAL SERVICES, ITS SUCCESSORS OR ASSIGNS, AND
     5  TO BE FINANCED BY THE INCURRING OF DEBT, ARE HEREBY ITEMIZED,
     6  TOGETHER WITH THEIR RESPECTIVE ESTIMATED FINANCIAL COSTS, AS
     7  FOLLOWS:
     8                                                           TOTAL
     9                                                          PROJECT
    10             PROJECT                                    ALLOCATION
    11  (1)  DEPARTMENT OF CORRECTIONS
    12     (I)  STATE CORRECTIONAL INSTITUTION AT
    13         CAMBRIDGE SPRINGS
    14         (A)  CONSTRUCT A NEW 128-CELL L-3 CLOSE
    15             SECURITY HOUSING UNIT WITH 230-BED
    16             CAPACITY WITH INFRASTRUCTURE AND
    17             KITCHEN UPGRADES                           16,800,000
    18             (BASE PROJECT ALLOCATION - $13,500,000)
    19             (DESIGN AND CONTINGENCIES - $3,300,000)
    20     (II)  STATE CORRECTIONAL INSTITUTION AT COAL
    21         TOWNSHIP
    22         (A)  CONSTRUCT A NEW 128-CELL L-3 CLOSE
    23             SECURITY HOUSING UNIT WITH 230-BED
    24             CAPACITY WITH INFRASTRUCTURE UPGRADE       14,500,000
    25             (BASE PROJECT ALLOCATION - $11,600,000)
    26             (DESIGN AND CONTINGENCIES - $2,900,000)
    27     (III)  STATE CORRECTIONAL INSTITUTION AT FOREST
    28         (A)  CONSTRUCT A NEW 128-CELL L-5 CLOSE
    29             SECURITY HOUSING UNIT WITH
    30             INFRASTRUCTURE UPGRADE                     16,500,000
    20070S0798B1311                  - 4 -     

     1             (BASE PROJECT ALLOCATION - $13,200,000)
     2             (DESIGN AND CONTINGENCIES - $3,300,000)
     3     (IV)  STATE CORRECTIONAL INSTITUTION AT
     4         GRATERFORD
     5         (A)  CONSTRUCT A NEW 2,300-BED L-3 MEDIUM
     6             SECURITY PRISON ON THE GROUNDS OF SCI
     7             GRATERFORD INCLUDING INFRASTRUCTURE AND
     8             ROAD WORK TO INCORPORATE THE TWO
     9             FACILITIES AT THIS SITE                   200,000,000
    10             (BASE PROJECT ALLOCATION -
    11             $160,000,000)
    12             (DESIGN AND CONTINGENCIES -
    13             $40,000,000)
    14     (V)  STATE CORRECTIONAL INSTITUTION AT
    15         HUNTINGDON
    16         (A)  CONSTRUCT A NEW 2,000-BED L-3 MEDIUM
    17             SECURITY PRISON ON THE GROUNDS OF SCI
    18             HUNTINGDON INCLUDING INFRASTRUCTURE AND
    19             ROAD WORK TO INCORPORATE THE TWO
    20             FACILITIES AT THIS SITE                   200,000,000
    21             (BASE PROJECT ALLOCATION -
    22             $160,000,000)
    23             (DESIGN AND CONTINGENCIES -
    24             $40,000,000)
    25     (VI)  STATE CORRECTIONAL INSTITUTION AT LAUREL
    26         HIGHLANDS
    27         (A)  ADDITIONAL FUNDS FOR DGS PROJECT 376-
    28             5, CONSTRUCT A NEW 230-BED CAPACITY
    29             FACILITY AND UPGRADE INFRASTRUCTURE AND
    30             SECURITY                                    1,500,000
    20070S0798B1311                  - 5 -     

     1             (BASE PROJECT ALLOCATION - $1,200,000)
     2             (DESIGN AND CONTINGENCIES - $300,000)
     3     (VII)  STATE REGIONAL CORRECTIONAL FACILITY AT
     4         MERCER
     5         (A)  ADDITIONAL FUNDS FOR DGS PROJECT 1572-
     6             10, CONSTRUCT A NEW 230-BED CAPACITY
     7             FACILITY AND UPGRADE INFRASTRUCTURE AND
     8             SECURITY                                    4,000,000
     9             (BASE PROJECT ALLOCATION - $3,200,000)
    10             (DESIGN AND CONTINGENCIES - $800,000)
    11     (VIII)  STATE CORRECTIONAL INSTITUTION AT MUNCY
    12         (A)  ADDITIONAL FUNDS FOR DGS PROJECT 574-
    13             26, ADDITION OF TWO NEW CELL BLOCKS FOR
    14             CLOSE SECURITY, EXPANSION OF INFIRMARY,
    15             OUTSIDE WAREHOUSE, ELECTRICAL AND
    16             BOILER UPGRADES, INCLUDING FUNDS FOR
    17             UTILITY UPGRADES AND KITCHEN AND DINING
    18             ROOM EXPANSION                              7,200,000
    19             (BASE PROJECT ALLOCATION - $5,800,000)
    20             (DESIGN AND CONTINGENCIES - $1,400,000)
    21     (IX)  STATE CORRECTIONAL INSTITUTION AT PINE
    22         GROVE
    23         (A)  CONSTRUCT A NEW 128-CELL L-3 CLOSE
    24             SECURITY HOUSING UNIT WITH 230-BED
    25             CAPACITY WITH INFRASTRUCTURE UPGRADE       14,500,000
    26             (BASE PROJECT ALLOCATION - $11,600,000)
    27             (DESIGN AND CONTINGENCIES - $2,900,000)
    28     (X)  STATE CORRECTIONAL INSTITUTION AT ROCKVIEW
    29         (A)  CONSTRUCT A NEW 2,000-BED L-3 MEDIUM
    30             SECURITY PRISON ON THE GROUNDS OF SCI
    20070S0798B1311                  - 6 -     

     1             ROCKVIEW INCLUDING INFRASTRUCTURE AND
     2             ROAD WORK TO INCORPORATE THE TWO
     3             FACILITIES AT THIS SITE                   200,000,000
     4             (BASE PROJECT ALLOCATION -
     5             $160,000,000)
     6             (DESIGN AND CONTINGENCIES -
     7             $40,000,000)
     8     (XI)  STATE CORRECTIONAL INSTITUTION AT
     9         SMITHFIELD
    10         (A)  ADDITIONAL FUNDS FOR DGS PROJECT 1573-
    11             7, EXPAND KITCHEN AND DINING FACILITY       2,500,000
    12             (BASE PROJECT ALLOCATION - $2,000,000)
    13             (DESIGN AND CONTINGENCIES - $500,000)
    14         (B)  ADDITIONAL FUNDS FOR DGS PROJECT 1573-
    15             9, CONSTRUCT A NEW 230-BED CAPACITY
    16             FACILITY AND UPGRADE INFRASTRUCTURE AND
    17             SECURITY                                    4,000,000
    18             (BASE PROJECT ALLOCATION - $3,200,000)
    19             (DESIGN AND CONTINGENCIES - $800,000)
    20     (XII)  NEW STATE CORRECTIONAL INSTITUTION -                    <--
    21         LUZERNE COUNTY
    22         (A)  CONSTRUCT A NEW 2,300-BED L-3 MEDIUM
    23             SECURITY PRISON WITHIN A 5-MILE RADIUS
    24             OF SCI RETREAT. INCLUDES CONSTRUCTION
    25             OF ALL OTHER FACILITIES AS NECESSARY TO
    26             OPERATE INSTITUTION                       200,000,000
    27             (BASE PROJECT ALLOCATION -
    28             $160,000,000)
    29             (DESIGN AND CONTINGENCIES -
    30             $40,000,000)
    20070S0798B1311                  - 7 -     

     1  SECTION 6.  ITEMIZATION OF FURNITURE AND EQUIPMENT PROJECTS.
     2     ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC
     3  IMPROVEMENT PROJECTS CONSISTING OF THE ACQUISITION OF MOVABLE
     4  FURNITURE AND EQUIPMENT TO COMPLETE PUBLIC IMPROVEMENT PROJECTS
     5  AND TO BE PURCHASED BY THE DEPARTMENT OF GENERAL SERVICES, ITS
     6  SUCCESSORS OR ASSIGNS AND TO BE FINANCED BY THE INCURRING OF
     7  DEBT ARE HEREBY ITEMIZED, TOGETHER WITH THEIR RESPECTIVE
     8  ESTIMATED FINANCIAL COSTS, AS FOLLOWS:
     9                                                           TOTAL
    10                                                          PROJECT
    11             PROJECT                                    ALLOCATION
    12  (1)  DEPARTMENT OF CORRECTIONS
    13     (I)  STATE CORRECTIONAL INSTITUTION AT
    14         GRATERFORD
    15         (A)  ORIGINAL FURNITURE AND EQUIPMENT FOR
    16             THE NEW INSTITUTION                         6,500,000
    17     (II)  STATE CORRECTIONAL INSTITUTION AT
    18         HUNTINGDON
    19         (A)  ORIGINAL FURNITURE AND EQUIPMENT FOR
    20             THE NEW INSTITUTION                         6,500,000
    21     (III)  STATE CORRECTIONAL INSTITUTION AT
    22         ROCKVIEW
    23         (A)  ORIGINAL FURNITURE AND EQUIPMENT FOR
    24             THE NEW INSTITUTION                         6,500,000
    25     (IV)  NEW STATE CORRECTIONAL INSTITUTION -                     <--
    26         LUZERNE COUNTY
    27         (A)  ORIGINAL FURNITURE AND EQUIPMENT FOR
    28             THE NEW INSTITUTION WITHIN A 5-MILE
    29             RADIUS OF SCI RETREAT                       6,500,000
    30  SECTION 7.  ITEMIZATION OF GENERAL FUND CURRENT REVENUE
    20070S0798B1311                  - 8 -     

     1                 PROJECTS.
     2     THE INDIVIDUAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC
     3  IMPROVEMENT PROJECTS TO BE CONSTRUCTED OR ACQUIRED BY THE
     4  DEPARTMENT OF GENERAL SERVICES, ITS SUCCESSORS OR ASSIGNS, AND
     5  TO BE FINANCED FROM GENERAL FUND CURRENT REVENUES, ARE HEREBY
     6  ITEMIZED, TOGETHER WITH THEIR RESPECTIVE ESTIMATED FINANCIAL
     7  COSTS, AS FOLLOWS:
     8                                                           TOTAL
     9                                                          PROJECT
    10             PROJECT                                    ALLOCATION
    11  (1)  DEPARTMENT OF CORRECTIONS
    12     (I)  STATE CORRECTIONAL INSTITUTION AT ALBION
    13         (A)  LEASE AND/OR PURCHASE AN EMERGENCY
    14             HOUSING FACILITY ALONG WITH RELATED
    15             INFRASTRUCTURE IMPROVEMENTS                 2,000,000
    16             (BASE PROJECT ALLOCATION - $2,000,000)
    17     (II)  STATE CORRECTIONAL INSTITUTION AT
    18         CAMBRIDGE SPRINGS
    19         (A)  LEASE AND/OR PURCHASE AN EMERGENCY
    20             HOUSING FACILITY ALONG WITH RELATED
    21             INFRASTRUCTURE IMPROVEMENTS                 2,000,000
    22     (III)  STATE CORRECTIONAL INSTITUTION AT
    23         GREENSBURG
    24         (A)  LEASE AND/OR PURCHASE AN EMERGENCY
    25             HOUSING FACILITY ALONG WITH RELATED
    26             INFRASTRUCTURE IMPROVEMENTS                 2,000,000
    27             (BASE PROJECT ALLOCATION - $2,000,000)
    28     (IV)  STATE CORRECTIONAL INSTITUTION AT
    29         HOUTZDALE
    30         (A)  LEASE AND/OR PURCHASE AN EMERGENCY
    20070S0798B1311                  - 9 -     

     1             HOUSING FACILITY ALONG WITH RELATED
     2             INFRASTRUCTURE IMPROVEMENTS                 2,000,000
     3             (BASE PROJECT ALLOCATION - $2,000,000)
     4     (V)  STATE CORRECTIONAL INSTITUTION AT LAUREL
     5         HIGHLANDS
     6         (A)  LEASE AND/OR PURCHASE TWO SEPARATE
     7             EMERGENCY HOUSING FACILITIES ALONG WITH
     8             RELATED INFRASTRUCTURE IMPROVEMENTS         4,000,000
     9             (BASE PROJECT ALLOCATION - $4,000,000)
    10     (VI)  STATE CORRECTIONAL INSTITUTION AT MAHANOY
    11         (A)  LEASE AND/OR PURCHASE AN EMERGENCY
    12             HOUSING FACILITY ALONG WITH RELATED
    13             INFRASTRUCTURE IMPROVEMENTS                 2,000,000
    14             (BASE PROJECT ALLOCATION - $2,000,000)
    15     (VII)  STATE CORRECTIONAL INSTITUTION AT MUNCY
    16         (A)  LEASE AND/OR PURCHASE TWO SEPARATE
    17             EMERGENCY HOUSING FACILITIES ALONG WITH
    18             RELATED INFRASTRUCTURE IMPROVEMENTS         4,000,000
    19             (BASE PROJECT ALLOCATION - $4,000,000)
    20     (VIII)  STATE CORRECTIONAL INSTITUTION AT PINE
    21         GROVE
    22         (A)  LEASE AND/OR PURCHASE AN EMERGENCY
    23             HOUSING FACILITY ALONG WITH RELATED
    24             INFRASTRUCTURE IMPROVEMENTS                 2,000,000
    25             (BASE PROJECT ALLOCATION - $2,000,000)
    26     (IX)  STATE CORRECTIONAL INSTITUTION AT RETREAT
    27         (A)  LEASE AND/OR PURCHASE AN EMERGENCY
    28             HOUSING FACILITY ALONG WITH RELATED
    29             INFRASTRUCTURE IMPROVEMENTS                 3,500,000
    30             (BASE PROJECT ALLOCATION - $3,500,000)
    20070S0798B1311                 - 10 -     

     1     (X)  STATE CORRECTIONAL INSTITUTION AT ROCKVIEW
     2         (A)  LEASE AND/OR PURCHASE AN EMERGENCY
     3             HOUSING FACILITY ALONG WITH RELATED
     4             INFRASTRUCTURE IMPROVEMENTS                 2,000,000
     5             (BASE PROJECT ALLOCATION - $2,000,000)
     6  SECTION 8.  DEBT AUTHORIZATION.
     7     (A)  PUBLIC IMPROVEMENTS.--THE GOVERNOR, AUDITOR GENERAL AND
     8  STATE TREASURER ARE HEREBY AUTHORIZED AND DIRECTED TO BORROW
     9  FROM TIME TO TIME IN ADDITION TO ANY AUTHORIZATION HERETOFORE OR
    10  HEREAFTER ENACTED, ON THE CREDIT OF THE COMMONWEALTH, SUBJECT TO
    11  THE LIMITATIONS PROVIDED IN THE CURRENT CAPITAL BUDGET, MONEY
    12  NOT EXCEEDING IN THE AGGREGATE THE SUM OF $681,500,000 AS MAY BE
    13  FOUND NECESSARY TO CARRY OUT THE ACQUISITION AND CONSTRUCTION OF
    14  THE PUBLIC IMPROVEMENT PROJECTS SPECIFICALLY ITEMIZED IN A
    15  CAPITAL BUDGET.
    16     (B)  FURNITURE AND EQUIPMENT.--THE GOVERNOR, AUDITOR GENERAL
    17  AND STATE TREASURER ARE HEREBY AUTHORIZED AND DIRECTED TO BORROW
    18  FROM TIME TO TIME IN ADDITION TO ANY AUTHORIZATION HERETOFORE OR
    19  HEREAFTER ENACTED, ON THE CREDIT OF THE COMMONWEALTH, SUBJECT TO
    20  THE LIMITATIONS PROVIDED IN THE CURRENT CAPITAL BUDGET, MONEY
    21  NOT EXCEEDING IN THE AGGREGATE THE SUM OF $19,500,000 AS MAY BE
    22  FOUND NECESSARY TO CARRY OUT THE ACQUISITION AND CONSTRUCTION OF
    23  THE PUBLIC IMPROVEMENT PROJECTS CONSISTING OF THE ACQUISITION OF
    24  ORIGINAL MOVABLE FURNITURE AND EQUIPMENT SPECIFICALLY ITEMIZED
    25  IN A CAPITAL BUDGET.
    26  SECTION 9.  ISSUE OF BONDS.
    27     THE INDEBTEDNESS AUTHORIZED IN THIS ACT SHALL BE INCURRED
    28  FROM TIME TO TIME AND SHALL BE EVIDENCED BY ONE OR MORE SERIES
    29  OF GENERAL OBLIGATION BONDS OF THE COMMONWEALTH IN SUCH
    30  AGGREGATE PRINCIPAL AMOUNT FOR EACH SERIES AS THE GOVERNOR, THE
    20070S0798B1311                 - 11 -     

     1  AUDITOR GENERAL AND THE STATE TREASURER SHALL DETERMINE, BUT THE
     2  LATEST STATED MATURITY DATE SHALL NOT EXCEED THE ESTIMATED
     3  USEFUL LIFE OF THE PROJECTS BEING FINANCED AS STATED IN SECTION
     4  10.
     5  SECTION 10.  ESTIMATED USEFUL LIFE AND TERM OF DEBT.
     6     (A)  ESTIMATED USEFUL LIFE.--THE GENERAL ASSEMBLY STATES THAT
     7  THE ESTIMATED USEFUL LIFE OF THE PUBLIC IMPROVEMENT PROJECTS
     8  ITEMIZED IN THIS ACT IS AS FOLLOWS:
     9         (1)  PUBLIC IMPROVEMENT PROJECTS, 30 YEARS.
    10         (2)  FURNITURE AND EQUIPMENT PROJECTS, 10 YEARS.
    11         (3)  TRANSPORTATION ASSISTANCE PROJECTS:
    12             (I)  ROLLING STOCK, 15 YEARS.
    13             (II)  PASSENGER BUSES, 12 YEARS.
    14             (III)  FURNITURE AND EQUIPMENT, 10 YEARS.
    15             (IV)  ALL OTHERS, 30 YEARS.
    16     (B)  TERM OF DEBT.--THE MAXIMUM TERM OF THE DEBT AUTHORIZED
    17  TO BE INCURRED UNDER THIS ACT IS 30 YEARS.
    18  SECTION 11.  APPROPRIATIONS.
    19     (A)  PUBLIC IMPROVEMENTS.--THE NET PROCEEDS OF THE SALE OF
    20  THE OBLIGATIONS AUTHORIZED IN THIS ACT ARE HEREBY APPROPRIATED
    21  FROM THE CAPITAL FACILITIES FUND TO THE DEPARTMENT OF GENERAL
    22  SERVICES IN THE MAXIMUM AMOUNT OF $681,500,000 $881,500,000 TO    <--
    23  BE USED BY IT EXCLUSIVELY TO DEFRAY THE FINANCIAL COST OF THE
    24  PUBLIC IMPROVEMENT PROJECTS SPECIFICALLY ITEMIZED IN A CAPITAL
    25  BUDGET. AFTER RESERVING OR PAYING THE EXPENSES OF THE SALE OF
    26  THE OBLIGATION, THE STATE TREASURER SHALL PAY TO THE DEPARTMENT
    27  OF GENERAL SERVICES THE MONEYS AS REQUIRED AND CERTIFIED BY IT
    28  TO BE LEGALLY DUE AND PAYABLE.
    29     (B)  FURNITURE AND EQUIPMENT.--THE NET PROCEEDS OF THE SALE
    30  OF THE OBLIGATIONS AUTHORIZED IN THIS ACT ARE HEREBY
    20070S0798B1311                 - 12 -     

     1  APPROPRIATED FROM THE CAPITAL FACILITIES FUND TO THE DEPARTMENT
     2  OF GENERAL SERVICES IN THE MAXIMUM AMOUNT OF $19,500,000          <--
     3  $26,000,000 TO BE USED BY IT EXCLUSIVELY TO DEFRAY THE FINANCIAL  <--
     4  COST OF THE PUBLIC IMPROVEMENT PROJECTS CONSISTING OF THE
     5  ACQUISITION OF ORIGINAL MOVABLE FURNITURE AND EQUIPMENT
     6  SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET. AFTER RESERVING OR
     7  PAYING THE EXPENSES OF THE SALE OF THE OBLIGATION, THE STATE
     8  TREASURER SHALL PAY TO THE DEPARTMENT OF GENERAL SERVICES THE
     9  MONEYS AS REQUIRED AND CERTIFIED BY IT TO BE LEGALLY DUE AND
    10  PAYABLE.
    11  SECTION 12.  FEDERAL FUNDS.
    12     IN ADDITION TO THOSE FUNDS APPROPRIATED IN SECTION 11, ALL
    13  MONEYS RECEIVED FROM THE FEDERAL GOVERNMENT FOR THE PROJECTS
    14  SPECIFICALLY ITEMIZED IN THIS ACT ARE ALSO HEREBY APPROPRIATED
    15  FOR THOSE PROJECTS.
    16  SECTION 13.  DEPARTMENT OF CORRECTIONS FACILITIES.
    17     (A)  PREEMPTION OF LOCAL ORDINANCES.--CAPITAL PROJECTS IN THE
    18  CATEGORY OF PUBLIC IMPROVEMENT PROJECTS SPECIFICALLY ITEMIZED
    19  FOR THE DEPARTMENT OF CORRECTIONS IN SECTION 5(1)(I), (IV),       <--
    20  (VI), (VII), (VIII), (IX), (X), (XI) AND (XII) (II), (III), (V),  <--
    21  (VI), (IX) AND (X) ARE HEREBY AUTHORIZED TO BE CONSTRUCTED,
    22  ERECTED OR ACQUIRED BY THE DEPARTMENT OF GENERAL SERVICES, ITS
    23  SUCCESSORS OR ASSIGNS, OF THE DEPARTMENT OF CORRECTIONS,
    24  NOTWITHSTANDING ANY ZONING ORDINANCE, LAND USE ORDINANCE,
    25  BUILDING CODE OR OTHER REGULATION ADOPTED OR ENACTED BY A
    26  POLITICAL SUBDIVISION UNDER THE AUTHORITY OF ANY STATUTE OR
    27  UNDER THE AUTHORITY OF ANY HOME RULE CHARTER AUTHORIZED AND
    28  ADOPTED UNDER ANY STATUTE OR THE CONSTITUTION OF PENNSYLVANIA.
    29     (B)  PREEMPTION OF LOCAL ORDINANCES FOR 2005-2006 PROJECTS.--
    30  CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC IMPROVEMENT PROJECTS
    20070S0798B1311                 - 13 -     

     1  SPECIFICALLY ITEMIZED FOR THE DEPARTMENT OF CORRECTIONS IN
     2  SECTION 3(5)(IV.2)(A), (IV.4)(A) AND (V.1)(A) OF THE ACT OF JULY
     3  7, 2006 (P.L.390, NO.83), KNOWN AS THE CAPITAL BUDGET PROJECT
     4  ITEMIZATION ACT OF 2005-2006, ARE HEREBY AUTHORIZED TO BE
     5  CONSTRUCTED, ERECTED OR ACQUIRED BY THE DEPARTMENT OF GENERAL
     6  SERVICES, ITS SUCCESSORS OR ASSIGNS, OF THE DEPARTMENT OF
     7  CORRECTIONS, NOTWITHSTANDING ANY ZONING ORDINANCE, LAND USE
     8  ORDINANCE, BUILDING CODE OR OTHER REGULATION ADOPTED OR ENACTED
     9  BY A POLITICAL SUBDIVISION UNDER THE AUTHORITY OF ANY STATUTE OR
    10  UNDER THE AUTHORITY OF ANY HOME RULE CHARTER AUTHORIZED AND
    11  ADOPTED UNDER ANY STATUTE OR THE CONSTITUTION OF PENNSYLVANIA.
    12     (C)  PREEMPTION OF LOCAL ORDINANCES FOR 2001-2002 PROJECTS.--
    13  THE CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC IMPROVEMENT
    14  PROJECTS SPECIFICALLY ITEMIZED FOR THE DEPARTMENT OF CORRECTIONS
    15  IN SECTION 3(4)(XI)(A) OF THE ACT OF OCTOBER 30, 2002 (P.L.891,
    16  NO.131), KNOWN AS THE CAPITAL BUDGET PROJECT ITEMIZATION ACT OF
    17  2001-2002, ARE HEREBY AUTHORIZED TO BE CONSTRUCTED, ERECTED OR
    18  ACQUIRED BY THE DEPARTMENT OF GENERAL SERVICES, ITS SUCCESSORS
    19  OR ASSIGNS, OF THE DEPARTMENT OF CORRECTIONS, NOTWITHSTANDING
    20  ANY ZONING ORDINANCE, LAND USE ORDINANCE, BUILDING CODE OR OTHER
    21  REGULATION ADOPTED OR ENACTED BY A POLITICAL SUBDIVISION UNDER
    22  THE AUTHORITY OF ANY STATUTE OR UNDER THE AUTHORITY OF ANY HOME
    23  RULE CHARTER AUTHORIZED AND ADOPTED UNDER ANY STATUTE OR THE
    24  CONSTITUTION OF PENNSYLVANIA.
    25  SECTION 14.  SPECIAL CONTRACT PROVISIONS FOR DEPARTMENT OF
    26                 CORRECTIONS PROJECTS.
    27     THE DEPARTMENT OF GENERAL SERVICES SHALL USE THE COMPETITIVE
    28  SEALED PROPOSAL METHOD OF SOURCE SELECTION TO ENTER INTO A
    29  DESIGN/BUILD CONTRACT FOR THE PROJECTS WHICH ARE AUTHORIZED IN
    30  SECTIONS 5 AND 7. NOTWITHSTANDING THE PROVISIONS OF 62 PA.C.S. §
    20070S0798B1311                 - 14 -     

     1  322(6) (RELATING TO SPECIFIC CONSTRUCTION POWERS, DUTIES AND
     2  PROCEDURES), THE DEPARTMENT OF GENERAL SERVICES, UPON APPROVAL
     3  OF THE SECRETARY OF THE BUDGET, MAY COMPLY WITH THE PROVISIONS
     4  OF THE ACT OF MAY 1, 1913 (P.L.155, NO.104), REFERRED TO AS THE
     5  SEPARATIONS ACT, BY ENTERING INTO A DESIGN/BUILD CONTRACT WHICH
     6  REQUIRES THAT THE DESIGN/BUILD CONTRACTOR COMPLY WITH THE
     7  REQUIREMENTS OF THE SEPARATIONS ACT. ANY DEPARTMENT OF            <--
     8  CORRECTIONS PROJECT WHICH IS AUTHORIZED IN SECTION 5 OR 7 SHALL
     9  BE EXEMPT FROM THE PROVISIONS OF THE ACT OF MARCH 3, 1978
    10  (P.L.6, NO.3), KNOWN AS THE STEEL PRODUCTS PROCUREMENT ACT. THE
    11  SECRETARY OF THE BUDGET SHALL GIVE NOTIFICATION OF ANY SUCH
    12  DESIGN/BUILD CONTRACTS TO THE CHAIRMAN AND MINORITY CHAIRMAN OF
    13  THE APPROPRIATIONS COMMITTEE OF THE SENATE AND THE CHAIRMAN AND
    14  MINORITY CHAIRMAN OF THE APPROPRIATIONS COMMITTEE OF THE HOUSE
    15  OF REPRESENTATIVES TEN DAYS PRIOR TO ADVERTISING FOR A
    16  DEVELOPER. ANY DEPARTMENT OF CORRECTIONS PUBLIC IMPROVEMENT       <--
    17  PROJECT-ELIGIBLE EXPENDITURE OF FUNDS INCURRED PRIOR TO THE
    18  EFFECTIVE DATE OF THIS ACT WHICH IS DIRECTLY RELATED TO A PUBLIC
    19  IMPROVEMENT CAPITAL PROJECT ITEMIZED IN SECTION 5 OR SECTION 7
    20  SHALL BE CONSIDERED ELIGIBLE TO BE UTILIZED AS A PORTION OF THE
    21  EXPENDITURE OF FUNDS AND MAY BE CONSIDERED AS ELIGIBLE FOR
    22  REIMBURSEMENT FROM CAPITAL FUNDS FOR A PUBLIC IMPROVEMENT
    23  CAPITAL PROJECT ITEMIZED IN SECTION 5 OR SECTION 7.
    24  SECTION 15.  EDITORIAL CHANGES.
    25     IN EDITING AND PREPARING THIS ACT FOR PRINTING FOLLOWING THE
    26  FINAL ENACTMENT, THE LEGISLATIVE REFERENCE BUREAU SHALL INSERT
    27  OR REVISE LETTERS OR NUMBERS FOR PROJECTS WHERE THE LETTERS OR
    28  NUMBERS ARE MISSING OR REQUIRE REVISION. THE BUREAU SHALL ALSO
    29  REVISE THE TOTAL MONETARY AMOUNTS FOR THE TOTAL AUTHORIZATION,
    30  DEBT AUTHORIZATION, APPROPRIATIONS AND DEPARTMENTAL TOTALS AS
    20070S0798B1311                 - 15 -     

     1  NECESSARY TO AGREE WITH THE TOTAL MONETARY AMOUNTS OF THE
     2  PROJECTS.
     3  Section 4 16.  Effective date.                                    <--
     4     This act shall take effect July 1, 2007, or immediately,
     5  whichever is later.