                               CORRECTIVE REPRINT
        PRIOR PRINTER'S NOS. 2055, 2108               PRINTER'S NO. 2112

THE GENERAL ASSEMBLY OF PENNSYLVANIA


HOUSE BILL

No. 1631 Session of 2007


        INTRODUCED BY D. EVANS, JUNE 23, 2007

        AS RE-REPORTED FROM COMMITTEE ON APPROPRIATIONS, HOUSE OF
           REPRESENTATIVES, AS AMENDED, JUNE 26, 2007

                                     AN ACT

     1  Providing for the Pennsylvania Gaming Economic Development and
     2     Tourism Fund Capital Budget for 2007-2008; itemizing projects
     3     to be assisted by the Department of Community and Economic
     4     Development, together with their estimated financial costs;
     5     authorizing recurring payments for certain projects; and
     6     making appropriations.

     7     The General Assembly of the Commonwealth of Pennsylvania
     8  hereby enacts as follows:
     9  Section 1.  Short title.
    10     This act shall be known and may be cited as the Pennsylvania
    11  Gaming Economic Development and Tourism Fund Capital Budget
    12  Itemization Act for 2007-2008.
    13  Section 2.  Total authorizations from Pennsylvania Gaming
    14                 Economic Development and Tourism Fund.
    15     The total authorization for the projects itemized in section
    16  3 for grants by the Department of Community and Economic
    17  Development, its successors or assigns, and to be financed from
    18  the revenues of the Pennsylvania Gaming Economic Development and


     1  Tourism Fund shall be $498,240,000 $1,647,941,000.                <--
     2  Section 3.  Itemization of Pennsylvania Gaming Economic
     3                 Development and Tourism Fund projects.
     4     Projects for grants by the Department of Community and
     5  Economic Development, its successors or assigns, to be financed
     6  by the incurring of debt or revenues of the Pennsylvania Gaming
     7  Economic Development and Tourism Fund are hereby itemized,
     8  together with their respective estimated costs, as follows:
     9                                                          Project
    10             Project                                    Allocation
    11  (1)  ADAMS COUNTY  (RESERVED)                                     <--
    12  (2)  Allegheny County
    13     (i)  County projects
    14         (A)  Retirement of the indebtedness of an
    15             urban redevelopment authority in a city
    16             of the second class which is financed,
    17             in part, with the utilization of funds
    18             transferred to the regional asset
    19             district pursuant to Article XXXI-B of
    20             the act of July 28, 1953 (P.L.723,
    21             No.230), known as the Second Class
    22             County Code                                65,740,000
    23             (Base Project Allocation - $65,740,000)
    24         (B)  Retirement of indebtedness of a
    25             convention center in a city of the
    26             second class established pursuant to
    27             the authority of the act of July 29,
    28             1953 (P.L.1034, No.270), known as the
    29             Public Auditorium Authorities Law          20,000,000
    30             (Base Project Allocation - $20,000,000)
    20070H1631B2112                  - 2 -     

     1         (C)  Payment of the operating deficit for
     2             the operation of a convention center in
     3             a city of the second class established
     4             pursuant to the Public Auditorium
     5             Authorities Law                            20,000,000
     6             (Base Project Allocation - $20,000,000)
     7         (D)  Payments related to the construction
     8             of a facility designated for use by a
     9             professional hockey franchise,
    10             including $500,000 to a nonprofit
    11             community development fund to fund
    12             infrastructure, construction and
    13             redevelopment projects                      8,000,000
    14             (Base Project Allocation - $8,000,000)
    15         (E)  Debt service and development and
    16             economic development projects for an
    17             international airport located in a
    18             county of the second class                150,000,000
    19             (Base Project Allocation -
    20             $150,000,000)
    21         (F)  Distribution to a community
    22             infrastructure development fund of a
    23             county of the second class to fund
    24             construction, development, improvement
    25             and maintenance of infrastructure
    26             projects                                   80,000,000
    27             (Base Project Allocation - $80,000,000)
    28         (G)  Retirement of indebtedness and
    29             financing of a hotel or convention
    30             center in a city of the second class
    20070H1631B2112                  - 3 -     

     1             established pursuant to the authority
     2             of the Public Auditorium Authorities
     3             Law                                        44,000,000
     4             (Base Project Allocation - $44,000,000)
     5         (H)  Retirement of indebtedness of a county
     6             of the second class development fund
     7             created pursuant to the authority of
     8             Article XXXI-B of the Second Class
     9             County Code and the act of May 24, 1945
    10             (P.L.991, No.385), known as the Urban
    11             Redevelopment Law                          30,000,000
    12             (Base Project Allocation - $30,000,000)
    13     (II)  CITY OF MCKEESPORT                                       <--
    14         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    15             COSTS ASSOCIATED WITH THE MARSHALL
    16             DRIVE REDEVELOPMENT PROJECT                   500,000
    17     (III)  CITY OF PITTSBURGH
    18         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    19             RELATED COSTS FOR THE NATIONAL AVIARY
    20             EXPANSION                                  25,000,000
    21         (B)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    22             RELATED COSTS FOR STRIP DISTRICT
    23             INFRASTRUCTURE IMPROVEMENTS                25,000,000
    24         (C)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    25             RELATED COSTS FOR STRIP DISTRICT
    26             IMPROVEMENTS                                8,000,000
    27         (D)  ACQUISITION, CONSTRUCTION,
    28             INFRASTRUCTURE AND OTHER RELATED COSTS
    29             FOR THE PITTSBURGH ZOO AND PPG
    30             AQUARIUM                                    5,000,000
    20070H1631B2112                  - 4 -     

     1  (3)  ARMSTRONG COUNTY
     2     (I)  COUNTY PROJECTS (RESERVED)
     3     (II)  CITY OF PARKER
     4         (A)  LAND ACQUISITION, SITE DEVELOPMENT AND
     5             CONSTRUCTION TO SUPPORT THE
     6             REVITALIZATION OF DOWNTOWN PARKER             500,000
     7     (III)  EAST FRANKLIN TOWNSHIP
     8         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
     9             RELATED COSTS FOR ARMSTRONG COUNTY
    10             COMMONS                                    10,000,000
    11  (4)  BEAVER COUNTY
    12     (I)  COUNTY PROJECTS (RESERVED)
    13     (II)  MIDLAND BOROUGH
    14         (A)  ACQUISITION, CONSTRUCTION,
    15             INFRASTRUCTURE AND OTHER RELATED COSTS
    16             FOR THE BEAVER COUNTY INDUSTRIAL
    17             MUSEUM                                      1,500,000
    18  (5)  BEDFORD COUNTY
    19     (I)  COUNTY PROJECTS (RESERVED)
    20     (II)  WEST PROVIDENCE TOWNSHIP
    21         (A)  ACQUISITION AND CONSTRUCTION OF
    22             EVERETT BUSINESS CENTER                     1,500,000
    23  (6)  BERKS COUNTY
    24     (I)  COUNTY PROJECTS
    25         (A)  PAYMENTS RELATED TO MEDICAL EQUIPMENT,
    26             TECHNOLOGY EQUIPMENT AND/OR ASSOCIATED
    27             SOFTWARE                                   10,000,000
    28     (II)  NEW MORGAN BOROUGH
    29         (A)  REDEVELOPMENT OF BETHLEHEM STEEL GRACE
    30             MINE SITE, INCLUDING CONSTRUCTION          25,000,000
    20070H1631B2112                  - 5 -     

     1  (7)  BLAIR COUNTY
     2     (I)  COUNTY PROJECTS (RESERVED)
     3     (II)  CITY OF ALTOONA AND LOGAN TOWNSHIP
     4         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
     5             RELATED COSTS FOR UPGRADES TO THE
     6             BOOKER T. WASHINGTON BASKETBALL COURT          60,000
     7         (B)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
     8             RELATED COSTS FOR UPGRADES TO THE
     9             MEMORIAL POOL                                 140,000
    10         (C)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    11             RELATED COSTS FOR UPGRADES TO THE
    12             FAIRVIEW BASKETBALL COURT                      10,000
    13         (D)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    14             RELATED COSTS FOR UPGRADES TO GARDEN
    15             HEIGHTS                                        63,000
    16         (E)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    17             RELATED COSTS FOR UPGRADES TO GARDEN
    18             HEIGHTS                                        90,000
    19         (F)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    20             RELATED COSTS FOR UPGRADES TO THE
    21             JUNIATA COMMUNITY CENTER                       90,000
    22         (G)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    23             RELATED COSTS FOR UPGRADES TO THE
    24             PROSPECT POOL                                  20,000
    25         (H)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    26             RELATED COSTS FOR UPGRADES TO GREENWOOD
    27             PARK                                          175,000
    28         (I)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    29             RELATED COSTS FOR UPGRADES TO THE
    30             KIPPLE RUN PARK                                20,000
    20070H1631B2112                  - 6 -     

     1         (J)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
     2             RELATED COSTS FOR UPGRADES TO GARFIELD
     3             PARK                                          150,000
     4         (K)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
     5             RELATED COSTS FOR UPGRADES TO THE
     6             VETERAN'S FIELD                               250,000
     7         (L)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
     8             RELATED COSTS FOR UPGRADES TO THE
     9             BOOKER T. WASHINGTON COMMUNITY CENTER          90,000
    10         (M)  CONSTRUCTION AND OTHER COSTS RELATED
    11             TO THE RENOVATION OF NEWBURG COMMUNITY
    12             PARK                                           10,000
    13         (N)  INFRASTRUCTURE COSTS RELATED TO THE
    14             REPLACEMENT OF A WATER TRANSMISSION
    15             LINE                                        1,300,000
    16     (III)  CITY OF ALTOONA
    17         (A)  REDEVELOPMENT OF AM TRAN INTERMODAL
    18             FACILITY, INCLUDING ACQUISITION AND
    19             CONSTRUCTION                                5,000,000
    20     (IV)  LOGAN TOWNSHIP
    21         (A) ACQUISITION, CONSTRUCTION,
    22             INFRASTRUCTURE AND OTHER COSTS RELATED
    23             TO THE REDEVELOPMENT OF KETTLE CREEK
    24             MIXED-USE DEVELOPMENT                       5,000,000
    25  (8)  BRADFORD COUNTY (RESERVED)
    26  (9)  BUCKS COUNTY
    27     (I)  COUNTY PROJECTS (RESERVED)
    28     (II)  BENSALEM
    29         (A)  EXPANSION AND RENOVATION OF BENSALEM
    30             RESCUE SQUAD, INCLUDING CONSTRUCTION          250,000
    20070H1631B2112                  - 7 -     

     1     (III)  BRISTOL BOROUGH
     2         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
     3             RELATED COSTS FOR PARKING LOT
     4             REDEVELOPMENT AND IMPROVEMENT               3,000,000
     5         (B)  ACQUISITION, CONSTRUCTION,
     6             INFRASTRUCTURE AND OTHER RELATED COSTS
     7             FOR A RECREATIONAL DEVELOPMENT PROJECT      3,500,000
     8         (C)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
     9             RELATED COSTS FOR FLOOD CONTROL AND
    10             WATERFRONT DEVELOPMENT                      3,000,000
    11     (IV)  BRISTOL TOWNSHIP
    12         (A)  ACQUISITION, CONSTRUCTION,
    13             INFRASTRUCTURE AND OTHER RELATED COSTS
    14             FOR ELM AND CHESTNUT STREETS
    15             REDEVELOPMENT                               2,500,000
    16     (V)  CHALFONT BOROUGH
    17         (A)  ACQUISITION, CONSTRUCTION,
    18             INFRASTRUCTURE AND OTHER COSTS RELATED
    19             TO THE EXPANSION OF THE CHILDREN'S
    20             HOSPITAL OF PHILADELPHIA SPECIALTY CARE
    21             AND AMBULATORY SURGERY CENTER                 500,000
    22     (VI)  FALLS TOWNSHIP
    23         (A)  ACQUISITION, CONSTRUCTION,
    24             INFRASTRUCTURE AND OTHER RELATED COSTS
    25             FOR THE YMCA COMMUNITY CENTER AT SNIPES
    26             FARM                                        4,000,000
    27     (VII)  MIDDLETOWN TOWNSHIP
    28         (A)  CONSTRUCTION AND OTHER RELATED COSTS
    29             FOR THE MIDDLETOWN COMMUNITY CENTER         1,500,000
    30     (VIII)  NOCKAMIXON
    20070H1631B2112                  - 8 -     

     1         (A)  RENOVATION OF CENTRAL BUCKS SENIOR
     2             CENTER, INCLUDING CONSTRUCTION AND
     3             RELATED INFRASTRUCTURE                         60,000
     4  (10)  BUTLER COUNTY
     5     (I)  COUNTY PROJECTS
     6         (A)  ACQUISITION, CONSTRUCTION,
     7             INFRASTRUCTURE AND OTHER RELATED COSTS
     8             FOR A NEW INPATIENT FACILITY AT BUTLER
     9             MEMORIAL HOSPITAL                          20,000,000
    10     (II)  BUTLER TOWNSHIP
    11         (A)  CONSTRUCTION OF BUTLER CROSSING
    12             PROJECT, INCLUDING RELATED
    13             INFRASTRUCTURE                              6,000,000
    14  (11)  CAMBRIA COUNTY
    15     (I)  COUNTY PROJECTS (RESERVED)
    16     (II)  CITY OF JOHNSTOWN
    17         (A)  ACQUISITION, CONSTRUCTION,
    18             INFRASTRUCTURE AND OTHER RELATED COSTS
    19             FOR BROWNFIELD REDEVELOPMENT INCLUDING
    20             FESTIVAL PARK                               5,000,000
    21         (B)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    22             RELATED COSTS FOR THE GREATER JOHNSTOWN
    23             YMCA AND COMMUNITY CENTER                   5,000,000
    24         (C)  ACQUISITION, CONSTRUCTION,
    25             INFRASTRUCTURE AND OTHER RELATED COSTS
    26             FOR DOWNTOWN HOUSING REDEVELOPMENT          5,000,000
    27     (III)  RICHLAND TOWNSHIP
    28         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    29             RELATED COSTS FOR THE REDEVELOPMENT OF
    30             A VOCATIONAL SCHOOL INTO A MIXED USE
    20070H1631B2112                  - 9 -     

     1             FACILITY                                    8,000,000
     2         (B)  ACQUISITION, CONSTRUCTION,
     3             INFRASTRUCTURE AND OTHER RELATED COSTS
     4             FOR THE EAST HILLS REDEVELOPMENT
     5             INCLUDING A RECREATION CENTER               7,000,000
     6  (12)  CAMERON COUNTY (RESERVED)
     7  (13)  CARBON COUNTY
     8     (I)  COUNTY PROJECTS
     9         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    10             RELATED COSTS FOR THE COUNTY OFFICE
    11             RENOVATION                                  1,000,000
    12     (II)  JIM THORPE BOROUGH
    13         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    14             RELATED COSTS FOR THE DEVELOPMENT OF
    15             THE SWITCHBACK GRAVITY RAILROAD
    16             HERITAGE SITE                               1,250,000
    17         (B)  ACQUISITION, CONSTRUCTION,
    18             INFRASTRUCTURE AND OTHER RELATED COSTS
    19             FOR A NEW BOROUGH BUILDING                    500,000
    20     (III)  MAHONING TOWNSHIP
    21         (A)  ACQUISITION, CONSTRUCTION,
    22             INFRASTRUCTURE AND OTHER RELATED COSTS
    23             FOR THE PAKERTOWN YARD INDUSTRIAL PARK      1,000,000
    24     (IV)  NESQUEHONING BOROUGH
    25         (A)  ACQUISITION, CONSTRUCTION,
    26             INFRASTRUCTURE AND OTHER RELATED COSTS
    27             FOR THE BROAD MOUNTAIN RESORT               7,500,000
    28         (B)  ACQUISITION, CONSTRUCTION,
    29             INFRASTRUCTURE AND OTHER RELATED COSTS
    30             FOR THE GREEN ACRES INDUSTRIAL PARK         1,000,000
    20070H1631B2112                 - 10 -     

     1     (V)  PALMERTON BOROUGH
     2         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
     3             RELATED COSTS TO REDEVELOPMENT OF THE
     4             FORMER HORSEHEAD LABORATORY BUILDING        1,500,000
     5         (B)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
     6             RELATED COSTS FOR THE REGIONAL WALL
     7             STREET WEST INITIATIVE                     25,000,000
     8     (VI)  SUMMIT HILL BOROUGH
     9         (A)  CONSTRUCTION AND OTHER RELATED COSTS
    10             FOR A NEW MUNICIPAL OFFICE AND FIRE
    11             COMPANY BUILDING                            1,250,000
    12     (VII)  WEATHERLY BOROUGH
    13         (A)  ACQUISITION, CONSTRUCTION,
    14             INFRASTRUCTURE AND OTHER RELATED COSTS
    15             FOR THE RAILROAD/STEEL REVITALIZATION
    16             PROJECT                                     1,500,000
    17         (B)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    18             RELATED COSTS FOR THE WEATHERLY CASTING
    19             AND MACHINE MANUFACTURING FACILITY            500,000
    20  (14)  CENTRE COUNTY
    21     (I)  COUNTY PROJECTS
    22         (A)  ACQUISITION, CONSTRUCTION,
    23             INFRASTRUCTURE AND OTHER RELATED COSTS
    24             FOR CENTRE COUNTY PAWS                        350,000
    25     (II)  BELLEFONTE BOROUGH
    26         (A)  ACQUISITION, CONSTRUCTION,
    27             INFRASTRUCTURE AND OTHER RELATED COSTS
    28             FOR THE BELLEFONTE BOROUGH WATER
    29             SYSTEM                                      1,000,000
    30  (15)  CHESTER COUNTY
    20070H1631B2112                 - 11 -     

     1     (I)  COUNTY PROJECTS (RESERVED)
     2     (II)  BOROUGH OF DOWNINGTOWN
     3         (A)  REDEVELOPMENT, INFRASTRUCTURE
     4             IMPROVEMENTS AND CONSTRUCTION TO
     5             DOWNTOWN DOWNINGTOWN                        4,000,000
     6         (B)  REDEVELOPMENT OF KARDON PARK,
     7             INCLUDING CONSTRUCTION, INFRASTRUCTURE
     8             AND ABATEMENT OF HAZARDOUS MATERIALS        5,000,000
     9         (C)  CONSTRUCTION OF PARKING STRUCTURE IN
    10             CENTRAL BUSINESS DISTRICT                   4,000,000
    11         (D)  REDEVELOPMENT OF FORMER SONOCO PAPER
    12             MILL SITE, INCLUDING CONSTRUCTION,
    13             INFRASTRUCTURE AND ABATEMENT OF
    14             HAZARDOUS MATERIALS                         1,750,000
    15         (E)  CONSTRUCTION OF PEDESTRIAN TUNNEL,
    16             INCLUDING INFRASTRUCTURE                    3,250,000
    17         (F)  ACQUISITION, CONSTRUCTION,
    18             INFRASTRUCTURE AND OTHER RELATED COSTS
    19             FOR RIVER STATION DOWNINGTOWN
    20             REDEVELOPMENT                               9,500,000
    21     (III)  WEST WHITELAND TOWNSHIP
    22         (A)  ACQUISITION, CONSTRUCTION,
    23             INFRASTRUCTURE AND OTHER RELATED COSTS
    24             FOR THE WEST WHITELAND TOWNSHIP
    25             EMERGENCY GENERATOR                           200,000
    26  (16)  CLARION COUNTY
    27     (I)  COUNTY PROJECTS (RESERVED)
    28     (II)  BOROUGH OF FOXBURG
    29         (A)  SITE DEVELOPMENT AND CONSTRUCTION OF
    30             MUNICIPAL CENTER BUILDING TO SUPPORT
    20070H1631B2112                 - 12 -     

     1             DOWNTOWN REVITALIZATION                     3,000,000
     2  (17)  CLEARFIELD COUNTY (RESERVED)
     3  (18)  CLINTON COUNTY
     4     (I)  COUNTY PROJECTS
     5         (A)  CONSTRUCTION AND OTHER RELATED COSTS
     6             FOR THE SR 120 RETAINING WALLS              1,200,000
     7         (B)  ACQUISITION, CONSTRUCTION,
     8             INFRASTRUCTURE AND OTHER RELATED COSTS
     9             FOR THE SUSQUEHANNA RIVER CORRIDOR          4,000,000
    10     (II)  BALD EAGLE TOWNSHIP
    11         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    12             RELATED COSTS FOR BALD EAGLE STADIUM        3,250,000
    13     (III)  CITY OF LOCK HAVEN
    14         (A)  CONSTRUCTION, ACQUISITION,
    15             INFRASTRUCTURE AND OTHER COSTS RELATED
    16             TO BUILDING A PEDESTRIAN MALL               5,750,000
    17         (B)  CONSTRUCTION, ACQUISITION,
    18             INFRASTRUCTURE AND OTHER COSTS
    19             ASSOCIATED WITH THE LOCK HAVEN
    20             UNIVERSITY ALUMNI CENTER                    4,000,000
    21     (IV)  MILL HALL BOROUGH
    22         (A)  ACQUISITION AND REDEVELOPMENT OF THE
    23             MILLBROOK PLAYHOUSE                         1,000,000
    24  (19)  COLUMBIA COUNTY (RESERVED)
    25  (20)  CRAWFORD COUNTY (RESERVED)
    26  (21)  CUMBERLAND COUNTY
    27     (I)  COUNTY PROJECTS (RESERVED)
    28     (II)  SILVER SPRING TOWNSHIP
    29         (A)  CONSTRUCTION, SITE PREPARATION AND
    30             OTHER RELATED COSTS FOR A MIXED-USE
    20070H1631B2112                 - 13 -     

     1             DEVELOPMENT                                 5,000,000
     2  (22)  DAUPHIN COUNTY
     3     (I)  COUNTY PROJECTS (RESERVED)
     4     (II)  DERRY TOWNSHIP
     5         (A)  ACQUISITION, CONSTRUCTION,
     6             INFRASTRUCTURE AND OTHER RELATED COSTS
     7             FOR THE HERSHEY AREA MASTER PLAN           25,000,000
     8     (III)  LOWER PAXTON TOWNSHIP
     9         (A)  CONSTRUCTION OF HEROES GROVE,
    10             INCLUDING RELATED INFRASTRUCTURE            1,000,000
    11         (B)  CONSTRUCTION AND DEVELOPMENT OF THE
    12             THOMAS B. GEORGE PARK                       1,000,000
    13     (IV)  LOWER SWATARA
    14         (A)  ACQUISITION, CONSTRUCTION,
    15             INFRASTRUCTURE AND OTHER RELATED COSTS
    16             FOR THE REDEVELOPMENT OF MEADE HEIGHTS      5,000,000
    17     (V)  SWATARA TOWNSHIP
    18         (A)  CONSTRUCTION AND INFRASTRUCTURE
    19             RELATED TO THE DEVELOPMENT OF SWATARA
    20             COMMONS                                    10,000,000
    21  (23)  DELAWARE COUNTY
    22     (I)  COUNTY PROJECTS
    23         (A)  ACQUISITION AND OTHER COSTS RELATED TO
    24             TRI BOROUGH FIRE COMPANY CONSOLIDATION        500,000
    25     (II)  BROOKHAVEN BOROUGH
    26         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    27             COSTS RELATED TO THE BROOKHAVEN SOLAR
    28             ENERGY PROJECT                                250,000
    29     (III)  GLENOLDEN
    30         (A)  REDEVELOPMENT AND CONSTRUCTION RELATED
    20070H1631B2112                 - 14 -     

     1             TO THE REVITALIZATION OF VARIOUS
     2             BOROUGH BUILDINGS                             500,000
     3     (IV)  MIDDLETOWN TOWNSHIP
     4         (A)  REDEVELOPMENT OF THE FRANKLIN MINT
     5             SITE, INCLUDING SITE DEVELOPMENT,
     6             INFRASTRUCTURE IMPROVEMENTS AND
     7             CONSTRUCTION                               15,000,000
     8     (V)  NORWOOD BOROUGH
     9         (A)  CONSTRUCTION OF FIREHOUSE AND POLICE
    10             STATION, INCLUDING FACILITY DEMOLITION
    11             AND SITE PREPARATION                        3,000,000
    12     (VI)  RIDLEY PARK BOROUGH
    13         (A)  REDEVELOPMENT AND CONSTRUCTION RELATED
    14             TO THE REVITALIZATION OF VARIOUS
    15             BOROUGH BUILDINGS                           1,000,000
    16         (B)  INFRASTRUCTURE IMPROVEMENTS AND
    17             CONSTRUCTION TO TAYLOR HOSPITAL             2,000,000
    18     (VII)  RIDLEY TOWNSHIP
    19         (A)  CONSTRUCTION AND OTHER COSTS RELATED
    20             TO SAPOVITZ PARK IMPROVEMENTS                  80,000
    21         (B)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    22             RELATED COSTS TO BLACK ROCK PARK
    23             IMPROVEMENTS                                   75,000
    24         (C)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    25             RELATED COSTS FOR THE RIDLEY TOWNSHIP
    26             COMMUNITY CENTER                            2,000,000
    27     (VIII)  SWARTHMORE BOROUGH
    28         (A)  CONSTRUCTION, ACQUISITION,
    29             INFRASTRUCTURE AND OTHER COSTS RELATED
    30             TO THE SWARTHMORE TOWN CENTER
    20070H1631B2112                 - 15 -     

     1             DEVELOPMENT                                 2,000,000
     2     (IX)  UPPER DARBY
     3         (A)  CONSTRUCTION AND ABATEMENT OF
     4             HAZARDOUS MATERIALS RELATED TO
     5             DEMOLITION OF 501 BYWOOD                    2,500,000
     6         (B)  CONSTRUCTION OF PUBLIC SAFETY
     7             BUILDING, INCLUDING LAND ACQUISITION
     8             AND RELATED COSTS                           7,000,000
     9         (C)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    10             COSTS RELATED TO REHABILITATION OF ST.
    11             CHARLES CEMETERY                            1,000,000
    12  (24)  ELK COUNTY (RESERVED)
    13  (25)  ERIE COUNTY (RESERVED)
    14  (26)  FAYETTE COUNTY (RESERVED)
    15  (27)  FOREST COUNTY (RESERVED)
    16  (28)  FRANKLIN COUNTY (RESERVED)
    17  (29)  FULTON COUNTY (RESERVED)
    18  (30)  GREENE COUNTY
    19     (I)  COUNTY PROJECTS
    20         (A)  ACQUISITION, CONSTRUCTION,
    21             INFRASTRUCTURE AND OTHER RELATED COSTS
    22             FOR A TIRE DEPOLYMERIZATION PLANT          12,000,000
    23     (II)  FRANKLIN TOWNSHIP
    24         (A)  CONSTRUCTION AND OTHER RELATED COSTS
    25             FOR THE COMMUNITY AQUATIC CENTER            2,000,000
    26     (III)  PERRY TOWNSHIP
    27         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    28             RELATED COSTS FOR THE MEADOW RIDGE
    29             BUSINESS PARK                               6,000,000
    30     (IV)  WAYNESBURG BOROUGH
    20070H1631B2112                 - 16 -     

     1         (A)  CONSTRUCTION, ACQUISITION,
     2             INFRASTRUCTURE, REDEVELOPMENT AND OTHER
     3             COSTS ASSOCIATED WITH DOWNTOWN
     4             WAYNESBURG STREETSCAPE IMPROVEMENTS         1,000,000
     5         (B)  ACQUISITION, CONSTRUCTION,
     6             INFRASTRUCTURE AND OTHER RELATED COSTS
     7             FOR WAYNESBURG REDEVELOPMENT PROJECT        4,000,000
     8         (C)  ACQUISITION, CONSTRUCTION,
     9             INFRASTRUCTURE AND OTHER RELATED COSTS
    10             FOR THE GREENE COUNTY ARC PROJECT           2,000,000
    11  (31)  HUNTINGDON COUNTY (RESERVED)
    12  (32)  INDIANA COUNTY
    13     (I)  COUNTY PROJECTS
    14         (A)  RENOVATION OF HISTORICAL COVERED
    15             BRIDGES, INCLUDING ACQUISITION,
    16             CONSTRUCTION AND OTHER RELATED COSTS        1,000,000
    17     (II)  BURRELL TOWNSHIP
    18         (A)  LAND ACQUISITION, SITE PREPARATION AND
    19             CONSTRUCTION RELATED TO DEVELOPMENT OF
    20             AMBULATORY CARE CENTER AT INDIANA
    21             REGIONAL MEDICAL CENTER                     5,000,000
    22         (B)  REDEVELOPMENT OF CORPORATE CAMPUS
    23             BUSINESS PARK, INCLUDING ACQUISITION,
    24             CONSTRUCTION, INFRASTRUCTURE AND OTHER
    25             RELATED COSTS                               3,000,000
    26         (C)  EXPANSION OF THE INTERCHANGE CENTER
    27             MULTI-TENANT BUILDING, INCLUDING
    28             CONSTRUCTION, LAND ACQUISITION AND
    29             OTHER RELATED COSTS                         2,000,000
    30     (III)  INDIANA BOROUGH
    20070H1631B2112                 - 17 -     

     1         (A)  REDEVELOPMENT, CONSTRUCTION AND
     2             INFRASTRUCTURE IMPROVEMENTS ALONG
     3             PHILADELPHIA STREET AND 7TH STREET          5,000,000
     4     (IV)  WHITE TOWNSHIP
     5         (A)  EXPANSION OF THE INDIANA REGIONAL
     6             MEDICAL CENTER, INCLUDING CONSTRUCTION
     7             AND RELATED INFRASTRUCTURE                  1,000,000
     8         (B)  ACQUISITION, RELATED INFRASTRUCTURE
     9             AND CONSTRUCTION OF AN ACCESS ROAD AND
    10             HANGARS AT THE JIMMY STEWART AIRPORT        2,000,000
    11         (C)  REDEVELOPMENT, CONSTRUCTION AND
    12             INFRASTRUCTURE IMPROVEMENTS ALONG WAYNE
    13             AVENUE AND 13TH STREET                      4,000,000
    14         (D)  RENOVATION OF THE MACK PARK RECREATION
    15             COMPLEX, INCLUDING CONSTRUCTION,
    16             INFRASTRUCTURE AND OTHER RELATED COSTS      3,000,000
    17         (E)  ACQUISITION, CONSTRUCTION AND RELATED
    18             INFRASTRUCTURE FOR THE DEVELOPMENT OF
    19             THE WINDY RIDGE BUSINESS PARK               4,000,000
    20         (F)  CONSTRUCTION OF A MEDICAL-MODEL
    21             WELLNESS CENTER AT INDIANA REGIONAL
    22             MEDICAL CENTER, INCLUDING ACQUISITION,
    23             INFRASTRUCTURE AND OTHER RELATED COSTS      2,000,000
    24         (G)  CONSTRUCTION OF AN AGRICULTURAL MULTI-
    25             TENANT BUILDING, INCLUDING LAND
    26             ACQUISITION, SITE PREPARATION AND OTHER
    27             RELATED COSTS                               3,000,000
    28  (33)  JEFFERSON COUNTY
    29     (I)  COUNTY PROJECTS
    30         (A)  ACQUISITION OF LAND AND DEVELOPMENT OF
    20070H1631B2112                 - 18 -     

     1             INFRASTRUCTURE AMENITIES AND RELATED
     2             IMPROVEMENTS TO USE IN DEVELOPMENT OF
     3             INDUSTRIAL/BUSINESS PARK ALONG
     4             INTERSTATE 80 IN JEFFERSON COUNTY           5,000,000
     5  (34)  JUNIATA COUNTY (RESERVED)
     6  (35)  LACKAWANNA COUNTY (RESERVED)
     7  (36)  LANCASTER COUNTY
     8     (I)  COUNTY PROJECTS (RESERVED)
     9     (II)  EPHRATA BOROUGH
    10         (A)  REDEVELOPMENT OF MOUNTAIN SPRINGS
    11             HOTEL PROPERTY, INCLUDING RELATED
    12             INFRASTRUCTURE                                500,000
    13     (III)  NEW HOLLAND BOROUGH
    14         (A)  REDEVELOPMENT OF HISTORIC BUILDING ON
    15             MAIN STREET, INCLUDING RELATED
    16             INFRASTRUCTURE                                500,000
    17  (37)  LAWRENCE COUNTY
    18     (I)  COUNTY PROJECTS (RESERVED)
    19     (II)  NEW WILMINGTON BOROUGH
    20         (A)  ACQUISITION, CONSTRUCTION,
    21             INFRASTRUCTURE AND OTHER COSTS RELATED
    22             TO THE REHABILITATION OF DOWNTOWN NEW
    23             WILMINGTON                                  1,500,000
    24  (38)  LEBANON COUNTY
    25     (I)  COUNTY PROJECTS (RESERVED)
    26     (II)  SOUTH LEBANON TOWNSHIP
    27         (A)  REDEVELOPMENT OF POLICE DEPARTMENT
    28             FACILITIES, INCLUDING CONSTRUCTION AND
    29             RELATED INFRASTRUCTURE                        565,000
    30  (39)  LEHIGH COUNTY
    20070H1631B2112                 - 19 -     

     1     (I)  COUNTY PROJECTS (RESERVED)
     2     (II)  CITY OF BETHLEHEM
     3         (A)  CONSTRUCTION AND OTHER RELATED COSTS
     4             FOR THE RENOVATION AND EXPANSION OF THE
     5             LEHIGH VALLEY HOSPITAL-MUHLENBERG           5,000,000
     6     (III)  SALISBURY TOWNSHIP
     7         (A)  ACQUISITION, CONSTRUCTION,
     8             INFRASTRUCTURE AND OTHER RELATED COSTS
     9             FOR THE EMERGENCY DEPARTMENT AND
    10             IMAGING DEPARTMENT EXPANSION AT LEHIGH
    11             VALLEY HOSPITAL AND HEALTH NETWORK          5,300,000
    12     (IV)  SLATINGTON BOROUGH
    13         (A)  ACQUISITION, CONSTRUCTION,
    14             INFRASTRUCTURE AND OTHER RELATED COSTS
    15             FOR A MAIN STREET PARK                        285,000
    16         (B)  CONSTRUCTION AND OTHER COSTS RELATED
    17             TO THE REHABILITATION OF THE SANITARY
    18             SEWER SYSTEM AND TREATMENT FACILITY           400,000
    19         (C)  CONSTRUCTION AND OTHER COSTS RELATED
    20             TO THE REPLACEMENT OF THE POTABLE WATER
    21             MAIN                                          400,000
    22  (40)  Luzerne County
    23     (i)  County projects
    24         (A)  Payments related to the construction
    25             and development of a cargo airport,
    26             including acquisition, infrastructure
    27             and other related costs                    16,500,000
    28             (Base Project Allocation - $16,500,000)
    29         (B)  ACQUISITION, CONSTRUCTION,                            <--
    30             INFRASTRUCTURE AND OTHER RELATED COSTS
    20070H1631B2112                 - 20 -     

     1             FOR THE SOUTH VALLEY PARKWAY               50,000,000
     2     (II)  CITY OF NANTICOKE
     3         (A)  ACQUISITION, CONSTRUCTION,
     4             INFRASTRUCTURE AND OTHER RELATED COSTS
     5             FOR MIXED-USE DEVELOPMENT ON EAST MAIN
     6             STREET                                      1,000,000
     7         (B)  ACQUISITION, CONSTRUCTION,
     8             INFRASTRUCTURE AND OTHER RELATED COSTS
     9             FOR THE LUZERNE COUNTY COMMUNITY
    10             COLLEGE CULINARY ARTS BUILDING WITH
    11             PARKING                                     3,000,000
    12         (C)  CONSTRUCTION AND OTHER RELATED COSTS
    13             FOR DOWNTOWN PARKING EXPANSION              2,000,000
    14     (III)  CITY OF WILKES-BARRE
    15         (A)  ACQUISITION, INFRASTRUCTURE,
    16             REDEVELOPMENT, ABATEMENT OF HAZARDOUS
    17             MATERIALS AND OTHER COSTS RELATED TO
    18             BUILDING THE IREM TEMPLE MOSQUE            10,000,000
    19         (B)  CONSTRUCTION, ACQUISITION,
    20             INFRASTRUCTURE, REDEVELOPMENT,
    21             ABATEMENT OF HAZARDOUS MATERIALS AND
    22             OTHER COSTS RELATED TO HANOVER
    23             INDUSTRIAL ESTATES                          1,000,000
    24         (C)  CONSTRUCTION, INFRASTRUCTURE,
    25             ACQUISITION, ABATEMENT OF HAZARDOUS
    26             MATERIALS, REDEVELOPMENT AND OTHER
    27             COSTS RELATED TO DOWNTOWN WILKES-BARRE
    28             REVITALIZATION PHASE II                    15,000,000
    29         (D)  CONSTRUCTION, INFRASTRUCTURE,
    30             ABATEMENT OF HAZARDOUS MATERIALS AND
    20070H1631B2112                 - 21 -     

     1             OTHER COSTS FOR PARKING FACILITIES
     2             RELATED TO IMPACT WILKES-BARRE              5,000,000
     3         (E)  CONSTRUCTION, INFRASTRUCTURE,
     4             ABATEMENT OF HAZARDOUS MATERIALS,
     5             REDEVELOPMENT AND OTHER COSTS RELATED
     6             TO IMPACT WILKES-BARRE                      3,000,000
     7     (IV)  ASHLEY BOROUGH
     8         (A)  ACQUISITION, CONSTRUCTION AND OTHER
     9             RELATED COSTS FOR THE MILL STREET MILL
    10             PROJECT                                       500,000
    11     (V)  HANOVER TOWNSHIP
    12         (A)  CONSTRUCTION, ACQUISITION,
    13             INFRASTRUCTURE, REDEVELOPMENT AND OTHER
    14             COSTS RELATED TO HANOVER CROSSINGS
    15             PHASE III AND IV                            4,000,000
    16         (B)  ACQUISITION, CONSTRUCTION,
    17             INFRASTRUCTURE AND OTHER RELATED COSTS
    18             FOR HANOVER CROSSINGS PHASE III AND IV      4,000,000
    19     (VI)  PLAINS TOWNSHIP
    20         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    21             RELATED COSTS FOR EAST MOUNTAIN DRIVE
    22             IMPROVEMENTS                                  600,000
    23         (B)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    24             RELATED COSTS FOR CAREY STREET
    25             IMPROVEMENTS                                  200,000
    26     (VII)  WRIGHT TOWNSHIP
    27         (A)  ACQUISITION, CONSTRUCTION,
    28             INFRASTRUCTURE AND OTHER RELATED COSTS
    29             FOR CRESTWOOD INDUSTRIAL PARK               1,500,000
    30         (B)  CONSTRUCTION, INFRASTRUCTURE,
    20070H1631B2112                 - 22 -     

     1             ABATEMENT OF HAZARDOUS MATERIALS,
     2             REDEVELOPMENT AND OTHER RELATED COSTS
     3             RELATED TO CRESTWOOD INDUSTRIAL PARK        2,500,000
     4  (41)  LYCOMING COUNTY
     5     (I)  COUNTY PROJECTS (RESERVED)
     6     (II)  CITY OF WILLIAMSPORT
     7         (A)  REDEVELOPMENT AND EXPANSION OF
     8             SUSQUEHANNA HEALTH HOSPITAL, INCLUDING
     9             ACQUISITION                                10,000,000
    10         (B)  ACQUISITION, CONSTRUCTION,
    11             INFRASTRUCTURE AND OTHER RELATED COSTS
    12             FOR THE REVITALIZATION OF TEXTROM
    13             LYCOMING FACILITIES                        10,000,000
    14         (C)  DESIGN AND CONSTRUCTION OF A NEW
    15             INTERMODAL FACILITY, INCLUDING RELATED
    16             INFRASTRUCTURE FOR THE CHURCH STREET
    17             TRANSPORTATION CENTER                       4,000,000
    18         (D)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    19             RELATED COSTS FOR MODIFICATIONS TO THE
    20             WILLIAMSPORT SEWER SYSTEMS                 20,000,000
    21         (E)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    22             RELATED COSTS FOR MODIFICATIONS TO THE
    23             PUBLIC WATER DISTRIBUTION SYSTEM            1,000,000
    24     (III)  CLINTON TOWNSHIP
    25         (A)  ACQUISITION, CONSTRUCTION,
    26             INFRASTRUCTURE AND OTHER RELATED COSTS
    27             FOR THE WHITE DEER RECREATION COMPLEX       1,000,000
    28     (IV)  DUBOISTOWN BOROUGH
    29         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    30             RELATED COSTS FOR MODIFICATIONS TO THE
    20070H1631B2112                 - 23 -     

     1             DUBOISTOWN SEWER SYSTEM                     1,000,000
     2     (V)  FAIRFIELD TOWNSHIP
     3         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
     4             RELATED COSTS FOR MODIFICATIONS TO THE
     5             LCWSA SEWER PLANT                           8,500,000
     6     (VI)  HUGHESVILLE BOROUGH, WOLF TOWNSHIP
     7         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
     8             RELATED COSTS FOR MODIFICATIONS TO THE
     9             HUGHESVILLE/WOLF SEWER PLANT                  100,000
    10     (VII)  JERSEY SHORE
    11         (A)  REDEVELOPMENT OF THE JERSEY SHORE
    12             YMCA, INCLUDING CONSTRUCTION AND
    13             RELATED INFRASTRUCTURE                      1,500,000
    14         (B)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    15             RELATED COSTS FOR MODIFICATIONS TO THE
    16             JERSEY SHORE SEWER PLANT                    3,000,000
    17     (VIII)  LOYALSOCK TOWNSHIP
    18         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    19             RELATED COSTS FOR MODIFICATIONS TO THE
    20             LOYALSOCK TOWNSHIP SEWER SYSTEM             4,000,000
    21     (IX)  MONTGOMERY BOROUGH
    22         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    23             RELATED COSTS FOR MODIFICATIONS TO THE
    24             MONTGOMERY SEWER PLANT                      3,000,000
    25     (X)  MONTGOMERY, BRADY AND CLINTON TOWNSHIPS
    26         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    27             RELATED COSTS FOR THE MONTGOMERY-BRADY-
    28             CLINTON SANITARY SEWER                      2,100,000
    29     (XI)  MUNCY BOROUGH
    30         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    20070H1631B2112                 - 24 -     

     1             RELATED COSTS FOR MODIFICATIONS TO THE
     2             MUNCY SEWER PLANT                           5,500,000
     3     (XII)  MUNCY TOWNSHIP
     4         (A)  INFRASTRUCTURE WITHIN PHASE IV OF THE
     5             MUNCY INDUSTRIAL PARK                       1,000,000
     6         (B)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
     7             RELATED COSTS FOR THE MUNCY INDUSTRIAL
     8             PARK PHASE IV WATER AND SEWER               1,000,000
     9     (XIII)  OLD LYCOMING TOWNSHIP
    10         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    11             RELATED COSTS FOR NEW WATER LINE FOR
    12             GRIMESVILLE ROAD NEIGHBORHOOD                 500,000
    13     (XIV)  SOUTH WILLIAMSPORT
    14         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    15             RELATED COSTS FOR NEW WATER STORAGE
    16             TANK TO SUPPORT COMMERCIAL AND
    17             RESIDENTIAL CONSTRUCTION IN GROWTH
    18             AREAS                                       1,000,000
    19         (B)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    20             RELATED COSTS FOR MODIFICATIONS TO THE
    21             SOUTH WILLIAMSPORT SEWER SYSTEM             3,500,000
    22     (XV)  WILLIAMSPORT AND OLD LYCOMING TOWNSHIPS
    23         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    24             RELATED COSTS FOR NEW WATER LINE AND
    25             ASSOCIATED PUMP STATION                     8,000,000
    26  (42)  MCKEAN COUNTY (RESERVED)
    27  (43)  MERCER COUNTY
    28     (I)  COUNTY PROJECTS (RESERVED)
    29     (II)  GREENVILLE BOROUGH
    30         (A)  CONSTRUCTION COSTS RELATED TO THE
    20070H1631B2112                 - 25 -     

     1             EXPANSION OF THE GREENVILLE BOROUGH
     2             BUILDING                                      625,000
     3     (III)  CITY OF SHARON
     4         (A)  ACQUISITION, CONSTRUCTION,
     5             INFRASTRUCTURE AND OTHER RELATED COSTS
     6             FOR THE DOWNTOWN SHARON REVITALIZATION      6,000,000
     7  (44)  MIFFLIN COUNTY (RESERVED)
     8  (45)  MONROE COUNTY
     9     (I)  COUNTY PROJECTS
    10         (A)  ACQUISITION, CONSTRUCTION,
    11             INFRASTRUCTURE AND OTHER RELATED COSTS
    12             FOR THE POCONO MOUNTAIN ECONOMIC
    13             DEVELOPMENT CORPORATION WEST END
    14             DEVELOPMENT SITES                          10,000,000
    15         (B)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    16             RELATED COSTS TO DEVELOP
    17             TELECOMMUNICATIONS INFRASTRUCTURE           4,000,000
    18         (C)  ACQUISITION, CONSTRUCTION,
    19             INFRASTRUCTURE AND OTHER RELATED COSTS
    20             FOR THE EAST STROUDSBURG SCHOOL
    21             DISTRICT MEMORIAL STADIUM                   1,870,000
    22     (II)  BARRETT TOWNSHIP
    23         (A)  ACQUISITION, CONSTRUCTION AND
    24             RENOVATION COSTS RELATED TO THE
    25             EXPANSION OF A SENIOR CITIZEN/COMMUNITY
    26             CENTER                                        138,000
    27     (III)  COOLBAUGH TOWNSHIP
    28         (A)  ACQUISITION, CONSTRUCTION,
    29             INFRASTRUCTURE AND OTHER RELATED COSTS
    30             FOR THE POCONO MOUNTAIN PUBLIC LIBRARY
    20070H1631B2112                 - 26 -     

     1             BUILDING                                    1,000,000
     2         (B)  RUNWAY EXPANSION AT THE POCONO
     3             MOUNTAIN MUNICIPAL AIRPORT                  1,000,000
     4         (C)  ACQUISITION, CONSTRUCTION,
     5             INFRASTRUCTURE AND OTHER RELATED COSTS
     6             FOR THE COMMERCE COURT EXTENSION            2,500,000
     7         (D)  ACQUISITION, CONSTRUCTION,
     8             INFRASTRUCTURE AND OTHER RELATED COSTS
     9             FOR THE POCONO MOUNTAIN ECONOMIC
    10             DEVELOPMENT RAIL SERVED BUSINESS PARK       4,000,000
    11     (IV)  EAST STROUDSBURG BOROUGH
    12         (A)  CONSTRUCTION AND OTHER COSTS RELATED
    13             TO THE EAST STROUDSBURG UNIVERSITY
    14             CONFERENCE CENTER                           2,000,000
    15         (B)  CONSTRUCTION, ACQUISITION,
    16             INFRASTRUCTURE, REDEVELOPMENT AND OTHER
    17             COSTS RELATED TO THE POCONO MOUNTAINS
    18             REGIONAL CONVENTION CENTER                 37,500,000
    19         (C)  CONSTRUCTION AND OTHER COSTS RELATED
    20             TO THE POCONO MOUNTAINS REGIONAL
    21             CONVENTION CENTER                          75,000,000
    22         (D)  ACQUISITION, CONSTRUCTION,
    23             INFRASTRUCTURE AND OTHER RELATED COSTS
    24             FOR A PARKING GARAGE ADJACENT TO POCONO
    25             MEDICAL CENTER                             14,000,000
    26         (E)  CONSTRUCTION OF COMPUTER SECURITY
    27             RESEARCH CENTER AT EAST STROUDSBURG
    28             UNIVERSITY RESEARCH AND TECHNOLOGY
    29             PARK                                        2,000,000
    30     (V)  BOROUGH OF MT. POCONO
    20070H1631B2112                 - 27 -     

     1         (A)  ACQUISITION, CONSTRUCTION,
     2             INFRASTRUCTURE AND OTHER RELATED COSTS
     3             FOR MOUNT POCONO MUNICIPAL AUTHORITY
     4             WASTE WATER CHILLER                         2,500,000
     5     (VI)  POCONO TOWNSHIP
     6         (A)  NORTHAMPTON COMMUNITY COLLEGE, MONROE
     7             CAMPUS - CONSTRUCTION OF NEW CAMPUS TO
     8             INCREASE THE AVAILABILITY OF ACADEMIC
     9             SQUARE FOOTAGE                             44,000,000
    10     (VII)  STROUDSBURG BOROUGH
    11         (A)  ACQUISITION, CONSTRUCTION AND OTHER
    12             RELATED COSTS FOR THE SHERMAN THEATER
    13             PERFORMING ARTS CENTER                      3,000,000
    14         (B)  ACQUISITION, RESTORATION AND EXPANSION
    15             OF THE SHERMAN THEATER                      1,500,000
    16     (VIII)  TOBYHANNA TOWNSHIP
    17         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    18             RELATED COSTS FOR THE TOBYHANNA
    19             TOWNSHIP SEWAGE AUTHORITY PROJECTS          3,500,000
    20     (IX)  MULTIPLE MUNICIPALITIES
    21         (A)  ACQUISITION, CONSTRUCTION,
    22             INFRASTRUCTURE AND OTHER RELATED COSTS
    23             FOR REHABILITATION OF EAST STROUDSBURG
    24             TO DELAWARE WATER GAP RAIL LINE IN EAST
    25             STROUDSBURG AND STROUDSBURG BOROUGHS
    26             AND MIDDLE SMITHFIELD TOWNSHIP              1,250,000
    27         (B)  CONSTRUCTION OF BATHROOMS FOR PERSONS
    28             WITH DISABILITIES, FIELD IMPROVEMENTS
    29             AND RELATED INFRASTRUCTURE FOR
    30             CHALLENGER PROGRAM IN POCONO, PARADISE
    20070H1631B2112                 - 28 -     

     1             AND JACKSON TOWNSHIPS                         100,000
     2  (46)  MONTGOMERY COUNTY
     3     (I)  COUNTY PROJECTS
     4         (A)  ACQUISITION, CONSTRUCTION,
     5             INFRASTRUCTURE AND OTHER RELATED COSTS
     6             FOR THE MONTGOMERY COUNTY EXPO CENTER      19,000,000
     7     (II)  LOWER SALFORD TOWNSHIP
     8         (A)  CONSTRUCTION OF RESTROOM FACILITIES AT
     9             HARLEYSVILLE BASEBALL PARK                     95,000
    10     (III)  NORRISTOWN
    11         (A)  ACQUISITION, CONSTRUCTION,
    12             INFRASTRUCTURE AND OTHER RELATED COSTS
    13             FOR THE CULTURAL ARTS CENTER                3,000,000
    14         (B)  ACQUISITION AND OTHER COSTS RELATED TO
    15             THE CONSTRUCTION OF A WASTEWATER
    16             TREATMENT PLANT IN NORRISTOWN              25,000,000
    17     (IV)  UPPER MERION TOWNSHIP
    18         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    19             RELATED COSTS FOR THE VILLAGE AT VALLEY
    20             FORGE                                     100,000,000
    21  (47)  MONTOUR COUNTY (RESERVED)
    22  (48)  NORTHAMPTON COUNTY
    23     (I)  COUNTY PROJECTS
    24         (A)  ACQUISITION, CONSTRUCTION,
    25             INFRASTRUCTURE AND OTHER RELATED COSTS
    26             FOR THE STEELSTAX COMMUNITY PROJECT        12,000,000
    27     (II)  BETHLEHEM TOWNSHIP
    28         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    29             RELATED COSTS FOR THE SUMMIT VALLEY        21,500,000
    30     (III)  NORTH CATASAUQUA
    20070H1631B2112                 - 29 -     

     1         (A)  RENOVATION OF BOROUGH HALL TO BE USED
     2             FOR A SENIOR CENTER AND MULTI-USE
     3             FACILITY                                      650,000
     4  (49)  NORTHUMBERLAND COUNTY
     5     (I)  COUNTY PROJECTS (RESERVED)
     6     (II)  SUNBURY
     7         (A)  RESTORATION AND REHABILITATION OF THE
     8             CLOCK TOWER IN THE HISTORIC
     9             NORTHUMBERLAND COUNTY COURT HOUSE             200,000
    10         (B)  ACQUISITION, CONSTRUCTION,
    11             INFRASTRUCTURE AND OTHER RELATED COSTS
    12             FOR THE EXPANSION OF THE EAST SUNBURY
    13             FIRE STATION TO INCLUDE A PARKING LOT         130,000
    14  (50)  PERRY COUNTY (RESERVED)
    15  (51)  Philadelphia County
    16     (i)  County projects
    17         (A)  Reimbursement to the Commonwealth, any
    18             other body corporate and politic
    19             created by law or a city of the first
    20             class to the extent that the
    21             Commonwealth, any other body corporate
    22             and politic created by law or a city of
    23             the first class has made debt service
    24             payments for the Pennsylvania
    25             Convention Center or has made payments
    26             for the operation expenses of the
    27             Pennsylvania Convention Center during
    28             the prior fiscal year                      64,000,000
    29             (Base Project Allocation - $64,000,000)
    30     (II)  CITY OF PHILADELPHIA                                     <--
    20070H1631B2112                 - 30 -     

     1         (A)  CONSTRUCTION, REDEVELOPMENT AND OTHER
     2             COSTS ASSOCIATED WITH THE ACADEMY OF
     3             NATURAL SCIENCE EXHIBIT                       500,000
     4         (B)  ACQUISITION, CONSTRUCTION AND OTHER
     5             RELATED COSTS FOR THE PHILADELPHIA
     6             POLYTECHNIC CHARTER HIGH SCHOOL            10,000,000
     7         (C)  ACQUISITION, CONSTRUCTION AND OTHER
     8             RELATED COSTS FOR THE REDEVELOPMENT OF
     9             THE HISTORIC JOHN GRASS COMPANY
    10             BUILDING                                      700,000
    11         (D)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    12             RELATED COSTS FOR THE BETSY ROSS HOUSE        500,000
    13         (E)  CONSTRUCTION AND OTHER RELATED COSTS
    14             FOR THE WASHINGTON SQUARE
    15             REDEVELOPMENT                               1,000,000
    16         (F)  ACQUISITION, CONSTRUCTION,
    17             INFRASTRUCTURE AND OTHER COSTS RELATED
    18             TO THE EXPANSION OF THE FOX CHASE
    19             RECREATIONAL CENTER                         1,200,000
    20  (52)  PIKE COUNTY
    21     (I)  COUNTY PROJECTS (RESERVED)
    22     (II)  PALMYRA TOWNSHIP
    23         (A)  CONSTRUCTION AND OTHER RELATED COSTS
    24             TO THE LAKE WALLENPAUPACK VISITORS
    25             CENTER PROJECT                              2,000,000
    26  (53)  POTTER COUNTY (RESERVED)
    27  (54)  SCHUYLKILL COUNTY
    28     (I)  COUNTY PROJECTS
    29         (A)  ACQUISITION, INFRASTRUCTURE AND OTHER
    30             COSTS RELATED TO THE CONSTRUCTION OF A
    20070H1631B2112                 - 31 -     

     1             REGIONAL INDUSTRIAL PARK                    1,000,000
     2     (II)  WEST PENN TOWNSHIP
     3         (A)  ACQUISITION, INFRASTRUCTURE AND OTHER
     4             COSTS RELATED TO THE CONSTRUCTION OF A
     5             REGIONAL INDUSTRIAL PARK                    1,000,000
     6  (55)  SNYDER COUNTY
     7     (I)  COUNTY PROJECTS (RESERVED)
     8     (II)  SELINSGROVE BOROUGH
     9         (A)  RENOVATION OF SCIENCE HALL AT
    10             SUSQUEHANNA UNIVERSITY, INCLUDING
    11             RELATED INFRASTRUCTURE                      6,000,000
    12         (B)  CONSTRUCTION OF SUSQUEHANNA UNIVERSITY
    13             SCIENCE FACILITY                           15,000,000
    14  (56)  SOMERSET COUNTY
    15     (I)  COUNTY PROJECTS
    16         (A)  CONSTRUCTION AND RENOVATION FOR
    17             EXPANSION OF SOMERSET HOSPITAL              3,000,000
    18     (II)  JEFFERSON TOWNSHIP
    19         (A)  SITE DEVELOPMENT, CONSTRUCTION AND
    20             INFRASTRUCTURE IMPROVEMENTS TO PROPERTY
    21             LOCATED ALONG ROUTE 31                     10,000,000
    22     (III)  SOMERSET TOWNSHIP
    23         (A)  REDEVELOPMENT, CONSTRUCTION AND
    24             RELATED INFRASTRUCTURE COSTS FOR LAUREL
    25             HIGHLANDS BUSINESS PARK                     5,000,000
    26  (57)  SULLIVAN COUNTY
    27     (I)  COUNTY PROJECTS
    28         (A)  RENOVATIONS TO BUILDINGS AND GROUNDS
    29             OF SULLIVAN COUNTY FAIRGROUNDS              2,000,000
    30  (58)  SUSQUEHANNA COUNTY (RESERVED)
    20070H1631B2112                 - 32 -     

     1  (59)  TIOGA COUNTY
     2     (I)  COUNTY PROJECTS (RESERVED)
     3     (II)  SHIPPEN TOWNSHIP
     4         (A)  EXPANSION AND CONSTRUCTION OF NATURE
     5             QUEST GEOTOURISM LODGE, INCLUDING
     6             ACQUISITION AND INFRASTRUCTURE             12,500,000
     7     (III)  WELLSBORO BOROUGH
     8         (A)  ACQUISITION, CONSTRUCTION AND
     9             INFRASTRUCTURE IMPROVEMENTS OF A
    10             COMMUNITY PERFORMING ARTS CENTER            7,500,000
    11  (60)  UNION COUNTY (RESERVED)
    12  (61)  VENANGO COUNTY
    13     (I)  COUNTY PROJECTS (RESERVED)
    14     (II)  BOROUGH OF EMLENTON
    15         (A)  ACQUISITION, SITE DEVELOPMENT AND
    16             CONSTRUCTION TO SUPPORT REVITALIZATION
    17             IN THE BOROUGH OF EMLENTON                    500,000
    18  (62)  WARREN COUNTY (RESERVED)
    19  (63)  WASHINGTON COUNTY
    20     (I)  COUNTY PROJECTS (RESERVED)
    21     (II)  ALLENPORT BOROUGH
    22         (A)  ACQUISITION, CONSTRUCTION,
    23             INFRASTRUCTURE AND OTHER RELATED COSTS
    24             TO RESTORE THE BARGE SHIPPING FACILITY      2,500,000
    25     (III)  CALIFORNIA BOROUGH
    26         (A)  ACQUISITION, CONSTRUCTION,
    27             INFRASTRUCTURE AND OTHER RELATED COSTS
    28             FOR THE CALIFORNIA TECHNOLOGY PARK FILM
    29             INDUSTRY PROJECT                            2,500,000
    30     (IV)  CARROLL TOWNSHIP
    20070H1631B2112                 - 33 -     

     1         (A)  CONSTRUCTION AND OTHER RELATED COSTS
     2             FOR MONONGAHELA VALLEY HOSPITAL UPGRADE
     3             PROJECT                                     6,100,000
     4     (V)  HANOVER TOWNSHIP
     5         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
     6             RELATED COSTS TO REDEVELOP THE
     7             STARVAGGI PROPERTY                          2,500,000
     8  (64)  WAYNE COUNTY (RESERVED)
     9  (65)  WESTMORELAND COUNTY
    10     (I)  COUNTY PROJECTS (RESERVED)
    11     (II)  COOK TOWNSHIP
    12         (A)  ACQUISITION, CONSTRUCTION,
    13             INFRASTRUCTURE AND OTHER RELATED COSTS
    14             FOR A MARSH WASTEWATER TREATMENT
    15             SYSTEM                                        400,000
    16     (III)  UNITY TOWNSHIP
    17         (A)  EXPANSION OF EQUINE FACILITIES AT THE
    18             WESTMORELAND FAIRGROUNDS, INCLUDING
    19             CONSTRUCTION AND RELATED COSTS                300,000
    20     (IV)  UPPER BURRELL TOWNSHIP
    21         (A)  ACQUISITION, CONSTRUCTION,
    22             INFRASTRUCTURE AND OTHER RELATED COSTS
    23             OF A MANUFACTURING CAMPUS                   5,000,000
    24  (66)  WYOMING COUNTY (RESERVED)
    25  (67)  YORK COUNTY (RESERVED)
    26  (68)  MULTIPLE COUNTIES
    27     (I)  CARBON, MONROE, PIKE AND WAYNE
    28         (A)  INFRASTRUCTURE AND OTHER COSTS RELATED
    29             TO THE POCONO MOUNTAINS WAYFINDING
    30             SIGNING PROGRAM                               500,000
    20070H1631B2112                 - 34 -     

     1         (B)  CONSTRUCTION AND OTHER COSTS RELATED
     2             TO THE POCONO MOUNTAINS WAYFINDING
     3             SIGNING PROGRAM                             1,000,000
     4     (II)  WAYNE AND PIKE COUNTIES
     5         (A)  ACQUISITION, CONSTRUCTION,
     6             INFRASTRUCTURE AND OTHER RELATED COSTS
     7             FOR LAKE WALLENPAUPACK WATERSHED
     8             MANAGEMENT                                     60,000
     9  Section 4.  Duration of payments.
    10     Notwithstanding any other provisions of law, the following
    11  shall apply to the projects authorized in section 3:
    12         (1)  The amount allocated to the project described in
    13     section 3(2)(i)(A) shall be made through 2014-2015 in annual
    14     amounts, not to exceed $7,782,000 each, pursuant to an
    15     agreement with the Commonwealth specifying the amounts to be
    16     paid each year. The payment for 2014-2015 shall not exceed
    17     $11,736,000.
    18         (2)  The amount allocated to the project described in
    19     section 3(2)(i)(C) shall be made in annual amounts, not to
    20     exceed $2,000,000, for ten years. However, the amount paid
    21     shall not exceed the operating deficit of the David L.
    22     Lawrence Convention Center.
    23         (3)  The amount allocated to the project described in
    24     section 3(2)(i)(D) and (40)(i)(A) shall be made in annual
    25     amounts, in the amount allocated, for 30 years or the
    26     retirement of the debt issued for the project described in
    27     section 3(2)(i)(D) and (40)(i)(A), whichever is less.
    28         (4)  The amount allocated to the projects described in
    29     section 3(2)(i)(E) shall be made in annual amounts, not to
    30     exceed $15,000,000, for ten years.
    20070H1631B2112                 - 35 -     

     1         (5)  The amount allocated to the project described in
     2     section 3(51)(i)(A) and shall be made in annual amounts, not
     3     to exceed the amount allocated, for 30 years or the
     4     retirement of the debt issued for the project described in
     5     section 3(51)(i)(A), whichever is less. However, the amount
     6     paid may not exceed the actual amounts of debt service and
     7     operating expenses in any year. Payments made pursuant to
     8     section 3(51)(i)(A) which are reimbursements to the General
     9     Fund shall be deposited into the Capital Debt Fund for
    10     repayment of the debt issued.
    11  Section 5.  Appropriation.
    12     The sums necessary for the annual amounts itemized in
    13  sections 3 and 4 are hereby appropriated from the Pennsylvania
    14  Gaming Economic Development and Tourism Fund to the Department
    15  of Community and Economic Development, upon approval of the
    16  Governor, for the projects itemized in this act.
    17  Section 6.  Special provisions.
    18     (a)  Notwithstanding the provisions of 4 Pa.C.S. § 1407(d)
    19  (relating to Pennsylvania Gaming Economic Development Tourism
    20  Fund), the project PROJECTS authorized in section 3(2)(i)(D)      <--
    21  3(2) AND (51) shall be eligible for funding from the              <--
    22  Pennsylvania Gaming and Economic Development and Tourism Fund in
    23  the ten-year period beginning with the first fiscal year during
    24  which deposits are made into the fund.
    25     (b)  Notwithstanding the provisions of 4 Pa.C.S. § 1407(d),
    26  the project authorized in section 3(51)(i)(A) shall be eligible
    27  for funding from the Pennsylvania Gaming and Economic
    28  Development and Tourism Fund in the ten-year period beginning
    29  with the first fiscal year during which deposits are made into
    30  the fund and may include repayment of bonds issued to replace
    20070H1631B2112                 - 36 -     

     1  bonds issued for the Pennsylvania Convention Center,
     2  reimbursement of the Pennsylvania Convention Center Authority
     3  for bonds issued for the construction of the Pennsylvania
     4  Convention Center, or operating expenses of the Pennsylvania
     5  Convention Center.
     6     (c)  Notwithstanding any other law to the contrary, the
     7  requirements of section 318 of the act of February 9, 1999
     8  (P.L.1, No.1), known as the Capital Facilities Debt Enabling
     9  Act, shall provide the sole and exclusive requirements for
    10  bidding for the acquisition, development construction of the
    11  project in section 3(2)(i)(D).
    12  Section 7.  Effective date.
    13     This act shall take effect immediately.












    F22L72BIL/20070H1631B2112       - 37 -