PRIOR PRINTER'S NOS. 1970, 2107, 2151, PRINTER'S NO. 4129 2181, 2829, 2932, 3496
No. 1589 Session of 2007
INTRODUCED BY D. EVANS, JUNE 18, 2007
AMENDMENTS TO SENATE AMENDMENTS, HOUSE OF REPRESENTATIVES, JUNE 30, 2008
AN ACT 1 Providing for the capital budget for the fiscal year 2007-2008; 2 itemizing public improvement projects, furniture and 3 equipment projects, transportation assistance projects, 4 redevelopment assistance capital projects, flood control 5 projects, Keystone Recreation, Park and Conservation Fund 6 projects, Environmental Stewardship Fund projects, Motor 7 License Fund projects, State forestry bridge projects, 8 Pennsylvania Fish and Boat Commission projects, Manufacturing 9 Fund Projects PROJECTS, STATE ATV/SNOWMOBILE FUND PROJECTS, <-- 10 STATE TRANSPORTATION ENHANCEMENT FUNDS PROJECTS and federally 11 funded projects to be constructed or acquired or assisted by 12 the Department of General Services, the Department of 13 Community and Economic Development, the Department of 14 Conservation and Natural Resources, the Department of 15 Environmental Protection, the Pennsylvania Fish and Boat 16 Commission and the Department of Transportation, together 17 with their estimated financial costs; authorizing the 18 incurring of debt without the approval of the electors for 19 the purpose of financing the projects to be constructed, 20 acquired or assisted by the Department of General Services, 21 the Department of Community and Economic Development, the 22 Department of Conservation and Natural Resources, the 23 Department of Environmental Protection, the Pennsylvania Fish 24 and Boat Commission or the Department of Transportation; 25 stating the estimated useful life of the projects; providing 26 an exemption; providing for limitation on certain capital 27 projects, for special provisions for certain redevelopment 28 assistance capital projects and for preemption of local 29 ordinances for Department of Corrections projects; and making <-- 30 appropriations; AND MAKING A REPEAL. <-- 31 The General Assembly of the Commonwealth of Pennsylvania
1 hereby enacts as follows: 2 Section 1. Short title. 3 This act shall be known and may be cited as the Capital 4 Budget Project Itemization Act of 2007-2008. 5 Section 2. Total authorizations. 6 (a) Public improvements.--The total authorization for the 7 additional capital projects in the category of public 8 improvement projects itemized in section 3 and to be acquired or 9 constructed by the Department of General Services, its 10 successors or assigns and to be financed by the incurring of 11 debt shall be $5,120,432,000 $5,972,762,000. <-- 12 (b) Furniture and equipment.--The total authorization for 13 the additional capital projects in the category of public 14 improvement projects consisting of the acquisition of original 15 movable furniture and equipment to complete public improvement 16 projects itemized in section 4 and to be acquired by the 17 Department of General Services, its successors or assigns and to 18 be financed by the incurring of debt shall be $166,346,000 <-- 19 $173,481,000. <-- 20 (c) Transportation assistance.--The total authorization for 21 the capital projects in the category of transportation 22 assistance projects itemized in section 5 with respect to which 23 an interest is to be acquired in or constructed by the 24 Department of Transportation, its successors or assigns and to 25 be financed by the incurring of debt shall be $750,939,000 <-- 26 $954,737,000. <-- 27 (d) Redevelopment assistance.--The total authorization for 28 the additional capital projects in the category of redevelopment 29 assistance capital projects itemized in section 6 for capital 30 grants by the Department of Community and Economic Development, 20070H1589B4129 - 2 -
1 its successors or assigns and to be financed by the incurring of 2 debt shall be $6,482,798,000 $7,533,808,000. <-- 3 (e) Flood control.--The total authorization for the capital 4 projects in the category of flood control projects itemized in 5 section 7 and to be constructed by the Department of 6 Environmental Protection, its successors or assigns, and to be 7 financed by the incurring of debt, shall be $74,526,000 <-- 8 $96,199,000. <-- 9 (f) Keystone Recreation, Park and Conservation Fund.--The 10 total authorization for the capital projects in the category of 11 public improvement projects itemized in section 8 and to be 12 constructed by the Department of Conservation and Natural 13 Resources, its successors or assigns and to be financed from 14 current revenues in the Keystone Recreation, Park and 15 Conservation Fund shall be $28,613,000 $34,353,000. <-- 16 (g) Environmental Stewardship Fund projects.--The total 17 authorization for the capital projects in the category of public 18 improvement projects itemized in section 9 and to be constructed 19 by the Department of Conservation and Natural Resources, its 20 successors or assigns and to be financed from current revenues 21 in the Environmental Stewardship Fund shall be $143,655,000 <-- 22 $159,705,000. <-- 23 (h) State forestry bridge projects.--The total authorization 24 for the capital projects itemized in section 10 to be 25 constructed by the Department of Conservation and Natural 26 Resources, its successors or assigns and to be financed by oil 27 company franchise tax revenues pursuant to 75 Pa.C.S. § 28 9502(a)(2)(iv) (relating to imposition of tax) shall be 29 $8,300,000 $11,215,000. <-- 30 (i) General Fund current revenue projects.--The total 20070H1589B4129 - 3 -
1 authorization for the capital projects in the category of public 2 improvement projects itemized in section 11 and to be developed 3 or constructed by the Department of General Services, its 4 successors or assigns and to be financed from current revenues 5 in the General Fund shall be $29,600,000. 6 (j) Manufacturing Fund current revenue projects.--The total 7 authorization for the capital projects in the category of public 8 improvement projects itemized in section 11.1 and to be 9 constructed by the Department of General Services, its 10 successors or assigns, and to be financed from current revenues 11 in the Manufacturing Fund shall be $3,000,000. 12 (k) Fish and Boat Fund projects.--The total authorization 13 for the capital projects in the category of public improvement 14 projects itemized in section 11.2 to be acquired or developed by 15 the Pennsylvania Fish and Boat Commission and to be financed by 16 the incurring of debt or by current revenues of the Fish Fund 17 and the Boat Fund pursuant to executive authorization shall be 18 $79,100,000. 19 (L) STATE ATV/SNOWMOBILE PROJECTS.--THE TOTAL AUTHORIZATION <-- 20 FOR THE CAPITAL PROJECTS ITEMIZED IN SECTION 11.3 TO BE 21 CONSTRUCTED BY THE DEPARTMENT OF CONSERVATION AND NATURAL 22 RESOURCES, ITS SUCCESSORS OR ASSIGNS AND TO BE FINANCED FROM 23 CURRENT REVENUES IN THE STATE ATV/SNOWMOBILE FUND SHALL BE 24 $1,000,000. 25 (M) STATE TRANSPORTATION ENHANCEMENT PROJECTS.--THE TOTAL 26 AUTHORIZATION FOR THE CAPITAL PROJECTS ITEMIZED IN SECTION 11.4 27 TO BE CONSTRUCTED BY THE DEPARTMENT OF CONSERVATION AND NATURAL 28 RESOURCES, ITS SUCCESSORS AND ASSIGNS, AND TO BE FINANCED FROM 29 CURRENT REVENUES FROM STATE TRANSPORTATION ENHANCEMENT FUNDS 30 SHALL BE $1,000,000. 20070H1589B4129 - 4 -
1 (l) (N) Motor License Fund projects.--The total <-- 2 authorization for the capital projects in the category of public 3 improvement projects itemized in section 11.3 11.5 and to be <-- 4 developed by the Department of General Services, its successors 5 or assigns, for the Department of Transportation, and to be 6 financed by the incurring of debt or from current revenues in 7 the Motor License Fund is $24,144,000. 8 Section 3. Itemization of public improvement capital projects. 9 Additional capital projects in the category of public 10 improvement projects to be constructed or acquired by the 11 Department of General Services, its successors or assigns, and 12 to be financed by the incurring of debt, are hereby itemized, 13 together with their respective estimated financial costs, as 14 follows: 15 Total 16 Project 17 Project Allocation 18 (1) Office of Administration 19 (i) Statewide mobile radio and microwave 20 system 21 (A) Additional funds for DGS project 950- 22 10, Statewide mobile radio and 23 microwave system 36,100,000 24 (Base Project Allocation - $36,100,000) 25 (ii) Commonwealth Technology Center 26 (A) Additional funds for DGS project 920-1 27 security and availability of 28 operations 1,000,000 29 (Base Project Allocation - $1,000,000) 30 (2) Department of Agriculture 20070H1589B4129 - 5 -
1 (i) Health Diagnostic Laboratory 2 (A) Construct a new Pennsylvania Animal 3 Health Diagnostic Laboratory (PADLS) 4 with Bio-Safety Level-3 capabilities to 5 support PADLS 33,000,000 6 (Base Project Allocation - $29,700,000) 7 (Design and Contingencies - $3,300,000) 8 (ii) State Dairy Farm 9 (A) Rehabilitate and construct several 10 support facilities for State dairy farm 11 to complement existing dairy operation 500,000 12 (Base Project Allocation - $450,000) 13 (Design and Contingencies - $50,000) 14 (iii) Pennsylvania Fairs 15 (A) Pennsylvania Fairs matching funds 5,000,000 16 (Base Project Allocation - $5,000,000) 17 (iv) Department Headquarters 18 (A) Supplemental funding to Project No. 19 700.43 to complete upgrades, repairs 20 and renovations to original electrical, 21 roofing and mechanical systems 5,000,000 22 (v) State farm enhancement 23 (A) Construction and renovation of State 24 farm site in Berks County 5,000,000 25 (B) Construction and renovation of State 26 farm site in Snyder County 5,000,000 27 (vi) Farm Show Complex 28 (A) Amending the description of Project 29 No. 700.41, Phase III, Act 1999-35 2,000,000 30 (2.1) CAPITOL PRESERVATION COMMITTEE <-- 20070H1589B4129 - 6 -
1 (I) SOLDIER MEMORIAL 2 (A) FOR A SOLDIER MEMORIAL IDENTIFYING THE 3 MIDDLE EAST CONFLICTS THAT WOULD BE 4 DEVELOPED IN KEEPING WITH OTHER 5 MEMORIALS ALREADY PLACED IN THE CAPITOL 6 COMPLEX SOLDIERS GROVE PARK AND 7 IMPROVEMENTS SURROUNDING THE MEMORIAL 800,000 8 (3) Department of Conservation and Natural 9 Resources 10 (i) Bald Eagle State Park 11 (A) Rehabilitate and develop a family 12 campground at the State park including 13 infrastructure 2,000,000 14 (Base Project Allocation - $2,000,000) 15 (I.1) CARBON COUNTY <-- 16 (A) CONSTRUCT SMALL NATURE INN 6,000,000 17 (BASE PROJECT ALLOCATION - $5,000,000) 18 (DESIGN AND CONTINGENCIES - $1,000,000) 19 (ii) Chester County 20 (A) Acquire the Strawbridge Property lands 21 in Chester County 4,000,000 22 (Land Allocation - $4,000,000) 23 (B) ACQUISITION AND DEVELOPMENT OF THE <-- 24 SHRYOCK PROPERTY 2,000,000 25 (iii) Clear Creek State Park 26 (A) Construct new maintenance facility 27 including infrastructure 1,800,000 28 (Base Project Allocation - $1,800,000) 29 (iv) Cook Forest State Park 30 (A) Replace the office/visitors' center 2,500,000 20070H1589B4129 - 7 -
1 (Base Project Allocation - $2,000,000) 2 (Design and Contingencies - $500,000) 3 (B) Replace the pit latrines with modern 4 flush facilities including 5 infrastructure 1,000,000 6 (Base Project Allocation - $800,000) 7 (Design and Contingencies - $200,000) 8 (IV.1) CRAWFORD COUNTY <-- 9 (A) CONSTRUCT SMALL NATURE INN 6,000,000 10 (BASE PROJECT ALLOCATION - $5,000,000) 11 (DESIGN AND CONTINGENCIES - $1,000,000) 12 (v) Erie Bluffs State Park 13 (A) Provide for construction of the 14 initial development of 540 acre area 15 including infrastructure, roads, 16 trails, parking lots and boating 17 facilities 10,000,000 18 (Base Project Allocation - $8,000,000) 19 (Design and Contingencies - $2,000,000) 20 (vi) Forest District 3 21 (A) Rehabilitate and improve the Gunter 22 Valley Dam to return it to a safe 23 condition and in compliance with 24 current requirements 7,000,000 25 (Base Project Allocation - $5,600,000) 26 (Design and Contingencies - $1,400,000) 27 (vii) Forest District 4 28 (A) Repair and repave roads including 29 returning a portion back to a gravel 30 road 5,000,000 20070H1589B4129 - 8 -
1 (Base Project Allocation - $4,000,000) 2 (Design and Contingencies - $1,000,000) 3 (viii) Forest District 7 4 (A) Rehabilitate roadways throughout the 5 forest to ensure safety and to provide 6 public access for outdoor activities 3,000,000 7 (Base Project Allocation - $2,400,000) 8 (Design and Contingencies - $600,000) 9 (ix) Forest District 9 10 (A) Rehabilitate roadways throughout the 11 forest to ensure safety and to provide 12 public access for outdoor activities 3,000,000 13 (Base Project Allocation - $2,400,000) 14 (Design and Contingencies - $600,000) 15 (x) Forest District 10 16 (A) Rehabilitate roadways throughout the 17 forest to ensure safety and to provide 18 public access for outdoor activities 3,000,000 19 (Base Project Allocation - $2,400,000) 20 (Design and Contingencies - $600,000) 21 (xi) Forest District 12 22 (A) Rehabilitate roadways throughout the 23 forest to ensure safety and to provide 24 public access for outdoor activities 3,000,000 25 (Base Project Allocation - $2,400,000) 26 (Design and Contingencies - $600,000) 27 (xii) Forest District 13 28 (A) Rehabilitate roadways throughout the 29 forest to ensure safety and to provide 30 public access for outdoor activities 3,000,000 20070H1589B4129 - 9 -
1 (Base Project Allocation - $2,400,000) 2 (Design and Contingencies - $600,000) 3 (xiii) Forest District 15 4 (A) Rehabilitate roadways throughout the 5 forest to ensure safety and to provide 6 public access for outdoor activities 3,000,000 7 (Base Project Allocation - $2,400,000) 8 (Design and Contingencies - $600,000) 9 (xiv) Forest District 16 10 (A) Rehabilitate roadways throughout the 11 forest to ensure safety and to provide 12 public access for outdoor activities 3,000,000 13 (Base Project Allocation - $2,400,000) 14 (Design and Contingencies - $600,000) 15 (XIV.1) FOREST DISTRICT 19 <-- 16 (A) CONSTRUCT REST FACILITIES AND PARKING 17 LOTS 3,500,000 18 (BASE PROJECT ALLOCATION - $2,800,000) 19 (DESIGN AND CONTINGENCIES - $700,000) 20 (xv) Forest District 20 21 (A) Rehabilitate roadways throughout the 22 forest to ensure safety and to provide 23 public access for outdoor activities 3,000,000 24 (Base Project Allocation - $2,400,000) 25 (Design and Contingencies - $600,000) 26 (B) Rehabilitate rest facilities, parking 27 lots and multiple use trails and 28 refurbish living quarters as a 29 departmental training facility with 30 necessary equipment 2,500,000 20070H1589B4129 - 10 -
1 (Base Project Allocation - $2,000,000) 2 (Design and Contingencies - $500,000) 3 (xvi) Gouldsboro State Park 4 (A) Rehabilitate day use area and provide 5 for the replacement of lifeguard 6 building, bathhouse, boat rental 7 building and comfort station including 8 infrastructure 2,500,000 9 (Base Project Allocation - $2,000,000) 10 (Design and Contingencies - $500,000) 11 (xvi.1) Kinzua Bridge State Park 12 (A) Reconstruction of the Kinzua viaduct 42,000,000 13 (xvi.2) Lancaster County 14 (A) Development of a Rails-to-Trails 15 project in conjunction with the 16 Lancaster County Planning Commission, 17 Manor, Conestoga, Martic, Providence, 18 Eden, Bart and Sadbury Townships, 19 Quarryville Borough and the Lancaster 20 County Conservancy 9,000,000 21 (xvi.3) Laurel Mountain State Park 22 (A) Restoration and rehabilitation of 23 park 5,000,000 24 (Base Project Allocation - $5,000,000) 25 (B) Infrastructure, construction and other 26 related costs for the renovation and 27 rehabilitation of the Laurel Mountain 28 Ski Resort facilities 1,500,000 29 (xvii) Lehigh Gorge State Park 30 (A) Provide for the acquisition of land 20070H1589B4129 - 11 -
1 necessary to complete the scheme for 2 the park in conformance with Statewide 3 recreation plan 3,500,000 4 (Land Allocation - $3,500,000) 5 (xvii.1) Marsh Creek State Park 6 (A) Acquisition, demolition and 7 development of the Dorlans Mill/Shryock 8 property 5,000,000 9 (Base Project Allocation - $2,500,000) 10 (Land Allocation - $2,000,000) 11 (Design and Contingencies - $500,000) 12 (XVII.2) MCKEAN COUNTY <-- 13 (A) CONSTRUCT SMALL NATURE INN 6,000,000 14 (BASE PROJECT ALLOCATION - $5,000,000) 15 (DESIGN AND CONTINGENCIES - $1,000,000) 16 (xviii) Montgomery County 17 (A) Acquire the Erdenheim Farm lands in 18 Montgomery County 4,000,000 19 (Land Allocation -$4,000,000) 20 (xviii.1) Montgomery County and Philadelphia 21 County 22 (A) Engineering and construction of 23 Cresheim Trail between Valley Green in 24 Fairmount Park in Philadelphia and Fort 25 Washington State Park 2,500,000 26 (xix) Nescopeck State Park 27 (A) Develop day use area and provide for 28 the development of recreational and 29 educational facilities for day use 3,000,000 30 (Base Project Allocation - $2,500,000) 20070H1589B4129 - 12 -
1 (Design and Contingencies - $500,000) 2 (XIX.1) OHIOPYLE STATE PARK <-- 3 (A) DEVELOP A VISITORS' CENTER AND PARK 4 OFFICE TO ACCOMMODATE PARK USAGE 5,000,000 5 (BASE PROJECT ALLOCATION - $4,700,000) 6 (DESIGN AND CONTINGENCIES - $300,000) 7 (xx) Presque Isle State Park 8 (A) Provide for the replenishment of sand 9 for the park's beaches 2,100,000 10 (xx.1) Promised Land State Park 11 (A) Rehabilitate and improve lower lake 12 dam to return it to a safe condition 13 and in compliance with current 14 requirements 3,500,000 15 (Base Project Allocation - $2,800,000) 16 (Design and Contingencies - $700,000) 17 (B) Rehabilitation to infrastructure 139,000 18 (Base Project Allocation - $139,000) 19 (xxi) Quehanna Wild Area 20 (A) Provide for the remediation of land of 21 radioactive materials within the 22 Quehanna wild area at the former 23 nuclear reactor site 2,500,000 24 (Base Project Allocation - $2,500,000) 25 (B) Facilitate the cleanup and reclamation 26 of the Quehanna reactor site at 27 Moshannon State Forest 1,834,000 28 (Base Project Allocation - $1,834,000) 29 (xxii) Ricketts Glen State Park 30 (A) Repair and repave roads including 20070H1589B4129 - 13 -
1 returning a portion back to a gravel
2 road 3,500,000
3 (Base Project Allocation - $2,800,000)
4 (Design and Contingencies - $700,000)
5 (xxiii) S.B. Elliott State Park
6 (A) Additional funding to complete the
7 visitors' center and overnight lodging
8 including furnishings and equipment 3,500,000
9 (Base Project Allocation - $3,500,000)
10 (xxiv) Shikellamy State Park
11 (A) Rehabilitate marina damaged by flood
12 waters in 2005 and 2006 including new
13 docks, railings, concrete bulkheads and
14 courtesy docks 1,500,000
15 (Base Project Allocation - $1,200,000)
16 (Design and Contingencies - $300,000)
17 (4) Department of Corrections
18 (I) STATE CORRECTIONAL INSTITUTION AT ALBION <--
19 (A) REPLACE BURIED PERIMETER INTRUSION
20 SYSTEM AROUND ENTIRE PERIMETER OF THE
21 INSTITUTION 800,000
22 (BASE PROJECT ALLOCATION - $650,000)
23 (DESIGN AND CONTINGENCIES - $150,000)
24 (i) (I.1) State Correctional Institution at <--
25 Cambridge Springs
26 (A) Construct a new 128-cell L-3 close
27 security housing unit with 230-bed
28 capacity with infrastructure upgrade 17,800,000
29 (Base Project Allocation - $14,800,000)
30 (Design and Contingencies - $3,000,000)
20070H1589B4129 - 14 -
1 (ii) State Correctional Institution at Camp 2 Hill 3 (A) Additional funds for DGS project 573- 4 26, replacement of Group 1 plumbing 5 components 8,000,000 6 (Base Project Allocation - $6,400,000) 7 (Design and Contingencies - $1,600,000) 8 (B) Additional funds for DGS project 573- 9 27, provide additional funding for 10 Phase 2 to complete the plumbing 11 repairs started under projects 573-27 12 to include steam pipe replacement and 13 repairs to pipe tunnels 6,000,000 14 (Base Project Allocation - $4,800,000) 15 (Design and Contingencies - $1,200,000) 16 (C) ADDITIONAL FUNDS FOR DGS PROJECT 573- <-- 17 29, REPLACE WATER MAIN INFRASTRUCTURE 1,000,000 18 (BASE PROJECT ALLOCATION - $825,000) 19 (DESIGN AND CONTINGENCIES - $175,000) 20 (iii) State Correctional Institution at Coal 21 Township 22 (A) Construct a new 128-cell L-3 close 23 security housing unit with 230-bed 24 capacity with infrastructure upgrade 15,500,000 25 (Base Project Allocation - $12,900,000) 26 (Design and Contingencies - $2,600,000) 27 (B) REPLACE BURIED PERIMETER INTRUSION <-- 28 SYSTEM AROUND ENTIRE PERIMETER OF THE 29 INSTITUTION 650,000 30 (BASE PROJECT ALLOCATION - $540,000) 20070H1589B4129 - 15 -
1 (DESIGN AND CONTINGENCIES - $110,000) 2 (iv) State Correctional Institution at Cresson 3 (A) Renovate and upgrade the heating and 4 air conditioning system serving the 5 medical building 550,000 6 (Base Project Allocation - $440,000) 7 (Design and Contingencies - $110,000) 8 (B) REPLACE THE DEL NORTE PERIMETER <-- 9 INTRUSION SYSTEM AROUND THE ENTIRE 10 PERIMETER OF THE INSTITUTION 700,000 11 (BASE PROJECT ALLOCATION - $580,000) 12 (DESIGN AND CONTINGENCIES - $120,000) 13 (C) ADDITIONAL FUNDS FOR DGS PROJECT 1574- 14 4, DESIGN A NEW KITCHEN AND LOADING 15 DOCK TO SERVE AN EXPANDED INMATE 16 POPULATION 4,000,000 17 (BASE PROJECT ALLOCATION - $3,300,000) 18 (DESIGN AND CONTINGENCIES - $700,000) 19 (IV.1) STATE CORRECTIONAL INSTITUTION AT 20 DALLAS 21 (A) ADDITIONAL FUNDS FOR DGS PROJECT 578- 22 19, PHASE 2, TO REBUILD THE NO. 2 COAL 23 BOILER WITH CONTROLS AND REQUIRED 24 PIPING AND DEMOLISH NO. 3 BOILER THAT 25 CANNOT BE REPAIRED 5,000,000 26 (BASE PROJECT ALLOCATION - $4,200,000) 27 (DESIGN AND CONTINGENCIES - $800,000) 28 (v) State Correctional Institution at Fayette 29 (A) Replace heating and cooling 30 distribution lines 10,500,000 20070H1589B4129 - 16 -
1 (Base Project Allocation - $8,750,000) 2 (Design and Contingencies - $1,750,000) 3 (vi) State Correctional Institution at Forest 4 (A) Construct a new 128-cell L-5 close 5 security housing unit with capacity 6 with infrastructure upgrade 17,500,000 7 (Base Project Allocation - $14,600,000) 8 (Design and Contingencies - $2,900,000) 9 (vii) State Correctional Institution at 10 Frackville 11 (A) Replace and upgrade the institution's 12 main electrical switchgear 520,000 13 (Base Project Allocation - $416,000) 14 (Design and Contingencies - $104,000) 15 (B) Construct a new 2,000-bed L-3 medium 16 security prison on the grounds of SCI 17 Frackville, including infrastructure 18 and road work to incorporate the two 19 facilities at this site 200,000,000 20 (Base Project Allocation - 21 $160,000,000) 22 (Design and Contingencies - 23 $40,000,000) 24 (viii) State Correctional Institution at 25 Graterford 26 (A) Construct a new 2,000 bed L-3 Medium 27 Security prison on the grounds of SCI 28 Graterford including infrastructure and 29 road work to incorporate the two 30 facilities at this site 200,000,000 20070H1589B4129 - 17 -
1 (Base Project Allocation - 2 $160,000,000) 3 (Design and Contingencies - 4 $40,000,000) 5 (B) Construct new roadway to access SCI 6 Graterford off Route 73 695,000 7 (Base Project Allocation - $556,000) 8 (Design and Contingencies - $139,000) 9 (C) ADDITIONAL FUNDS FOR DGS PROJECT 577- <-- 10 29, PHASE 3, INCLUDING REPLACING ALL 11 PLUMBING AND PLUMBING FIXTURES IN CELL 12 BLOCKS C, D AND E 15,000,000 13 (BASE PROJECT ALLOCATION - $12,500,000) 14 (DESIGN AND CONTINGENCIES - $2,500,000) 15 (D) CONSTRUCT A NEW L-3 MEDIUM OR L-4 16 CLOSE SECURITY PRISON WITH UP TO 2,100 17 BEDS ON THE GROUNDS OF SCI GRATERFORD, 18 INCLUDING NECESSARY INFRASTRUCTURE AND 19 ROAD WORK 200,000,000 20 (BASE PROJECT ALLOCATION - 21 $160,000,000) 22 (DESIGN AND CONTINGENCIES - 23 $40,000,000) 24 (ix) State Correctional Institution at 25 Huntingdon 26 (A) Construct a new 2,000 bed L-5 Maximum 27 Security prison on the grounds of SCI 28 Huntingdon including infrastructure and 29 road work to incorporate the two 30 facilities at this site 200,000,000 20070H1589B4129 - 18 -
1 (Base Project Allocation - 2 $160,000,000) 3 (Design and Contingencies - 4 $40,000,000) 5 (B) UPGRADE ELECTRICAL SERVICES TO BLOCKS <-- 6 AND CELLS TO MEET CURRENT ELECTRICAL 7 DEMANDS 2,625,000 8 (BASE PROJECT ALLOCATION - $2,200,000) 9 (DESIGN AND CONTINGENCIES - $425,000) 10 (x) State Correctional Institution at Laurel 11 Highlands 12 (A) Replace roofs on dietary building No.4 13 and housing unit building C 800,000 14 (Base Project Allocation - $640,000) 15 (Design and Contingencies - $160,000) 16 (B) Additional funds for DGS Project 376- 17 5, construct a new 230-bed capacity 18 facility and upgrade infrastructure and 19 security 2,000,000 20 (Base Project Allocation - $1,600,000) 21 (Design and Contingencies - $400,000) 22 (C) LAND ACQUISITION AND CONSTRUCTION OF <-- 23 COGENERATION BUILDING AS PART OF 24 INSTITUTION'S GUARANTEED ENERGY SAVINGS 25 PROJECT 100,000 26 (LAND ALLOCATION - $100,000) 27 (x.1) State Correctional Institution at 28 Mahanoy 29 (A) Construct a new 2,000-bed L-3 medium 30 security prison on the grounds of SCI 20070H1589B4129 - 19 -
1 Mahanoy, including infrastructure and 2 road work to incorporate the two 3 facilities at this site 200,000,000 4 (Base Project Allocation - 5 $160,000,000) 6 (Design and Contingencies - 7 $40,000,000) 8 (B) REPLACE BURIED PERIMETER INTRUSION <-- 9 SYSTEM AROUND ENTIRE PERIMETER OF THE 10 INSTITUTION 700,000 11 (BASE PROJECT ALLOCATION - $580,000) 12 (DESIGN AND CONTINGENCIES - $120,000) 13 (xi) State Correctional Institution at Mercer 14 (A) Replace roofs on medical building, M 15 Block and G Block 650,000 16 (Base Project Allocation - $520,000) 17 (Design and Contingencies - $130,000) 18 (B) Additional funds for DGS Project 1572- 19 12, construct a new 230-bed capacity 20 facility and upgrade infrastructure and 21 security 4,500,000 22 (Base Project Allocation - $3,700,000) 23 (Design and Contingencies - $800,000) 24 (C) EXPAND THE KITCHEN PREPARATION AREA <-- 25 AND DINING AREA TO INCLUDE NEW 26 EQUIPMENT AND RENOVATIONS AS REQUIRED 27 FOR EXPANDED POPULATION 3,000,000 28 (BASE PROJECT ALLOCATION - $2,500,000) 29 (DESIGN AND CONTINGENCIES - $500,000) 30 (xii) State Correctional Institution at Muncy 20070H1589B4129 - 20 -
1 (A) Replace roofs on Administration 2 building, Laundry building, Storeroom 3 building, Kitchen building, and housing 4 units A Block, M Block, K Block and F 5 Block 2,300,000 6 (Base Project Allocation - $1,840,000) 7 (Design and Contingencies - $460,000) 8 (B) Additional funds for DGS Project 574- 9 26, addition of two new cell blocks for 10 close security, expansion of infirmary, 11 outside warehouse, electrical and 12 boiler upgrades; also including funds 13 for utility upgrades and kitchen and 14 dining room expansion 7,700,000 15 (Base Project Allocation - $6,400,000) 16 (Design and Contingencies - $1,300,000) 17 (C) REPLACE INFIRMARY AND BUILD NEW LONG- <-- 18 TERM CARE UNIT AS REQUIRED TO MEET THE 19 DEMAND OF A LARGE INCREASE IN FEMALE 20 INMATES, AND AS THE FACILITY SERVING 21 GERIATRIC INMATES, MORE SPACE IS NEEDED 22 FOR THESE SERVICES 6,250,000 23 (BASE PROJECT ALLOCATION - $5,200,000) 24 (DESIGN AND CONTINGENCIES - $1,050,000) 25 (xiii) State Correctional Institution at Pine 26 Grove 27 (A) Construct a new 128-cell L-3 close 28 security housing unit with 230-bed 29 capacity with infrastructure upgrade 15,500,000 30 (Base Project Allocation - $12,900,000) 20070H1589B4129 - 21 -
1 (Design and Contingencies - $2,600,000) 2 (xiv) State Correctional Institution at 3 Rockview 4 (A) Construct a new 2,000 bed L-3 Medium 5 Security prison on the grounds of SCI 6 Rockview including infrastructure and 7 road work to complete the two 8 facilities at this site 200,000,000 9 (Base Project Allocation - 10 $160,000,000) 11 (Design and Contingencies - 12 $40,000,000) 13 (xv) State Correctional Institution at 14 Smithfield 15 (A) Additional funds for DGS Project 1573- 16 7, expand kitchen/dining facility 2,500,000 17 (Base Project Allocation - $2,000,000) 18 (Design and Contingencies - $500,000) 19 (B) Additional funds for DGS Project 1573- 20 9, construct a new 230-bed capacity 21 facility and upgrade infrastructure and 22 security 5,000,000 23 (Base Project Allocation - $4,100,000) 24 (Design and Contingencies - $900,000) 25 (xvi) New State Correctional Institution in 26 Luzerne County 27 (A) Construct a new 2,300-bed L-3 medium 28 security prison within a five-mile 29 radius of SCI Retreat. Includes 30 construction of all other facilities as 20070H1589B4129 - 22 -
1 necessary to operate institution 200,000,000 2 (Base Project Allocation - 3 $160,000,000) 4 (Design and Contingencies - 5 $40,000,000) 6 (xvii) New State Correctional Institution in 7 Northumberland County 8 (A) Construct a new 2,000-bed L-3 medium 9 security prison, including acquisition 10 of land, construction of infrastructure 11 and construction of all other 12 facilities as necessary to operate the 13 institution 200,000,000 14 (Base Project Allocation - 15 $160,000,000) 16 (Design and Contingencies - 17 $40,000,000) 18 (xviii) Corrections training rifle range and 19 indoor hand gun range 20 (A) Construction of a corrections training 21 rifle range and indoor hand gun range 2,000,000 22 (Base Project Allocation - $2,000,000) 23 (xix) New State Correctional Institution in 24 Fayette County 25 (A) Construct a new 2,000-bed L-3 medium 26 security prison, including construction 27 of all other facilities as necessary to 28 operate institution 200,000,000 29 (Base Project Allocation - 30 $160,000,000) 20070H1589B4129 - 23 -
1 (Design and Contingencies - 2 $40,000,000) 3 (xx) New State Correctional Institution in 4 Armstrong County 5 (A) Construct a new 2,300 bed L-3 medium 6 security prison, including construction 7 of all other facilities as necessary to 8 operate the institution 200,000,000 9 (Base Project Allocation - 10 $160,000,000) 11 (Design and Contingencies - 12 $40,000,000) 13 (XXI) NEW STATE CORRECTIONAL INSTITUTION IN <-- 14 PHILADELPHIA COUNTY 15 (A) CONSTRUCT A NEW 2,300 BED L-3 MEDIUM 16 SECURITY PRISON, INCLUDING ACQUISITION 17 OF LAND, INFRASTRUCTURE AND 18 CONSTRUCTION OF ALL OTHER FACILITIES AS 19 NECESSARY TO OPERATE THE INSTITUTION 200,000,000 20 (BASE PROJECT ALLOCATION - 21 $200,000,000) 22 (XXII) STATE CORRECTIONAL INSTITUTION AT 23 SOMERSET 24 (A) REPLACE BURIED PERIMETER INTRUSION 25 SYSTEM AROUND ENTIRE PERIMETER OF THE 26 INSTITUTION 800,000 27 (BASE PROJECT ALLOCATION - $650,000) 28 (DESIGN AND CONTINGENCIES - $150,000) 29 (XXIII) STATE CORRECTIONAL INSTITUTION AT 30 WAYMART 20070H1589B4129 - 24 -
1 (A) UPGRADE STORMWATER AND SEWER LINES BY 2 SEPARATING THE RAIN LEADERS AND SEWER 3 LINES TO MEET CURRENT CODES AND SEWER 4 AUTHORITY REQUIREMENTS ALONG WITH SEWER 5 AND STORM INFRASTRUCTURE 2,875,000 6 (BASE PROJECT ALLOCATION - $2,400,000) 7 (DESIGN AND CONTINGENCIES - $475,000) 8 (5) Department of Education 9 (i) Department of Education headquarters 10 (A) Provide improvements and upgrades to 11 renovate three floors of the Department 12 of Education headquarters building at 13 333 Market Street 1,750,000 14 (Base Project Allocation - $1,600,000) 15 (Design and Contingencies - $150,000) 16 (i.1) Scranton State School for the Deaf 17 (A) Provide improvements and upgrades to 18 the emergency, mechanical and 19 electrical systems throughout the 20 campus 7,560,000 21 (Base Project Allocation - $6,574,000) 22 (Design and Contingencies - $986,000) 23 (B) ADDITIONAL FUNDS FOR DGS PROJECT 416- <-- 24 15, LIFE SAFETY, HEALTH AND SECURITY 25 UPGRADES 3,500,000 26 (BASE PROJECT ALLOCATION - $3,500,000) 27 (C) INSTALL APPROXIMATELY 750 FEET OF 28 CONCRETE CULVERT STRUCTURE TO ROUTE 29 MEADOWBROOK CREEK UNDERGROUND 8,995,000 30 (BASE PROJECT ALLOCATION - $8,095,000) 20070H1589B4129 - 25 -
1 (DESIGN AND CONTINGENCIES - $900,000) 2 (D) ADDITIONAL FUNDS FOR DGS PROJECT 416- 3 14, RENOVATE GYMNASIUM 937,000 4 (BASE PROJECT ALLOCATION - $937,000) 5 (E) CONSTRUCT AN ADDITION DESIGNED FOR 6 STUDIO BROADCASTING AND DEVELOPMENT OF 7 VIDEO TRAINING PROGRAMS FOR THE DEAF 8 AND HARD OF HEARING 3,450,000 9 (BASE PROJECT ALLOCATION - $3,105,000) 10 (DESIGN AND CONTINGENCIES - $345,000) 11 (ii) Pennsylvania State University 12 (A) Provide for the capital renewal for 13 campuses in the eastern region of the 14 university including code compliances 15 and infrastructure upgrades 7,000,000 16 (Base Project Allocation - $7,000,000) 17 (B) Provide for the capital renewal for 18 campuses in the central region of the 19 university including code compliances 20 and infrastructure upgrades 7,000,000 21 (Base Project Allocation - $7,000,000) 22 (C) Provide for the capital renewal for 23 campuses in the western region of the 24 university including code compliances 25 and infrastructure upgrades 7,000,000 26 (Base Project Allocation - $7,000,000) 27 (D) Altoona campus, engineering and 28 research and extension building 30,000,000 29 (E) Dubois campus, engineering research 30 and extension building 30,000,000 20070H1589B4129 - 26 -
1 (F) University Park, engineering 2 administration, research and extension 3 building 80,000,000 4 (G) Capital Renewal, Phase II, Eastern 5 Region 14,000,000 6 (H) Capital Renewal, Phase II, Central 7 Region 14,000,000 8 (I) Capital Renewal, Phase II, Western 9 Region 14,000,000 10 (J) Capital Renewal, Phase IV at 11 University Park 40,000,000 12 (K) Renovation, rehabilitation and 13 construction costs for a chemical 14 engineering building 51,700,000 15 (L) Engineering Research and Extension 16 Facility in Philadelphia 30,000,000 17 (M) Construction of applied research lab 18 building in Innovation Park, including 19 site, utility, parking, landscaping, 20 signage and other related costs 50,000,000 21 (N) Eberly Campus, Fayette, construction 22 of annex to community center 1,500,000 23 (O) Eberly Campus, Fayette, construction 24 of annex to library 1,750,000 25 (P) Eberly Campus, Fayette, construction 26 of baseball/softball complex 1,500,000 27 (Q) Eberly Campus, Fayette, renovations to 28 the Center for Community and Public 29 Safety office 800,000 30 (R) Eberly Campus, Fayette, construction 20070H1589B4129 - 27 -
1 of residence hall 20,000,000 2 (S) PROVIDE ADDITIONAL FUNDS FOR THE <-- 3 CAPITAL RENEWAL FOR CAMPUSES IN THE 4 EASTERN REGION OF THE UNIVERSITY, 5 INCLUDING CODE COMPLIANCES AND 6 INFRASTRUCTURE UPGRADES 14,000,000 7 (BASE PROJECT ALLOCATION - $14,000,000) 8 (iii) University of Pennsylvania 9 (A) Construction of a Center for 10 Nanotechnology Research and 11 Development 30,000,000 12 (Base Project Allocation - $30,000,000) 13 (B) Construction of a new Life Sciences 14 Building 16,000,000 15 (Base Project Allocation - $16,000,000) 16 (iv) University of Pittsburgh 17 (A) Providing for upgrades and deferred 18 maintenance needs on all campuses 20,000,000 19 (Base Project Allocation - $16,667,000) 20 (Design and Contingencies - $3,333,000) 21 (B) Construction and other related costs 22 for the renovation of the Manufacturing 23 Assistance Center 375,000 24 (C) Additional funds for DGS Project No. 25 1103-385, construction of Salk Hall 26 addition 30,000,000 27 (D) Renovations and addition to Chevron 28 Science Center 25,000,000 29 (E) Programmatic renovations, Phase II, 30 all campuses 20,000,000 20070H1589B4129 - 28 -
1 (F) CONSTRUCTION, INFRASTRUCTURE <-- 2 IMPROVEMENTS AND OTHER COSTS RELATED TO 3 A SCHOOL OF NURSING AT THE UNIVERSITY 4 OF PITTSBURGH AT JOHNSTOWN 4,000,000 5 (v) Lincoln University 6 (A) Additional funds to renovate Langston 7 Hughes Library and correct problems 8 from structural design flaws, 9 continuation of DGS Project No. 1101- 10 44 7,000,000 11 (Base Project Allocation - $5,600,000) 12 (Design and Contingencies - $1,400,000) 13 (B) Additional funds for completion of 14 renovation of Wright Hall building 15 systems, classrooms and laboratory, 16 including ADA requirements for DGS 17 Project No. 1101-43 4,000,000 18 (Base Project Allocation - $3,200,000) 19 (Design and Contingencies - $800,000) 20 (C) Additional funds for landscaping, 21 sidewalks and other projects, Phase II, 22 DGS Project No. 1101-45 15,000,000 23 (D) Additional funds for DGS Project No. 24 1101-28A and emergency generators 1,800,000 25 (E) COMPLETELY RENOVATE JOHN MILLER DICKEY <-- 26 HALL TO MEET MODERN NEEDS 20,000,000 27 (BASE PROJECT ALLOCATION - $16,000,000) 28 (DESIGN AND CONTINGENCIES - $4,000,000) 29 (v.1) Lehigh Carbon Community College 30 (A) Construction of four athletic fields 2,200,000 20070H1589B4129 - 29 -
1 (B) Acquisition, construction, 2 infrastructure and other related costs 3 for student housing, at the Morgan 4 Center, Tamaqua Campus 7,000,000 5 (Base Project Allocation - $5,000,000) 6 (Design and Contingencies - $2,000,000) 7 (v.2) Community College of Allegheny County 8 (A) Construction of Science Center 14,500,000 9 (vi) Luzerne County Community College 10 (A) Construction, infrastructure and other 11 related costs for a public safety 12 institute 1,000,000 13 (B) Acquisition, construction, 14 infrastructure and other related costs 15 for student housing 2,000,000 16 (C) Acquisition, construction, 17 infrastructure and other related costs 18 for a new culinary arts building with 19 parking 3,000,000 20 (D) Construction and related costs for the 21 Kanjorski Building Health Sciences 22 Center at Luzerne Community College 2,352,000 23 (vii) Northampton Community College 24 (A) Monroe Campus, construction of new 25 campus to increase the availability of 26 academic square footage 44,000,000 27 (Base Project Allocation - $44,000,000) 28 (B) Northampton campus, renovations and 29 infrastructure improvements to the 30 boiler and cooling towers 500,000 20070H1589B4129 - 30 -
1 (C) Northampton campus, renovations and 2 expansion of the automotive technology 3 program facility 1,000,000 4 (D) Fowler Family Southside Center 5 renovations 1,000,000 6 (viii) Montgomery County Community College 7 (A) Construction, infrastructure and other 8 related costs to expand the Science 9 Center 750,000 10 (Base Project Allocation - $750,000) 11 (B) Roof replacement on 101 College Drive 12 building 500,000 13 (C) Exterior door replacements on central 14 campus facilities 135,000 15 (D) Construction of a walkway around the 16 perimeter of central campus 323,000 17 (E) Renovations and other related costs 18 for the relocation and expansion of the 19 theater facility 400,000 20 (viii.1) Community College of Philadelphia 21 (A) Construction and expansion of the 22 Northeast Philadelphia Regional Center 10,100,000 23 (viii.2) Pennsylvania Highlands Community 24 College 25 (A) Construction of Workforce Development 26 Center 500,000 27 (viii.3) Reading Area Community College 28 (A) Infrastructure improvements and 29 construction of Reading Area Community 30 College Academic Classroom 20070H1589B4129 - 31 -
1 Instructional Center 20,000,000 2 (viii.4) Temple University 3 (A) Design and construction of a research, 4 laboratory and office building 100,000,000 5 (ix) Thaddeus Stevens College of Technology 6 (A) Construction and other related costs 7 for the Thaddeus Stevens Technology 8 Center 4,000,000 9 (x) Westmoreland County Community College 10 (A) Construction and other related costs 11 for the New Kensington Education 12 Center 2,500,000 13 (B) Acquisition, infrastructure, 14 construction and other related costs 15 for the construction of a Workforce and 16 Economic Development Training Center, 17 located in New Kensington 3,700,000 18 (C) Infrastructure, construction and other 19 related costs for the construction of a 20 Workforce and Economic Development 21 Training Center, located in Youngwood 3,700,000 22 (D) Infrastructure, construction and other 23 costs related to the expansion of the 24 Public Safety Training Center 3,750,000 25 (xi) York Community College 26 (A) Acquisition, construction, 27 infrastructure and other related costs 28 for downtown York Community College 29 campus 7,000,000 30 (xii) Bucks County Community College 20070H1589B4129 - 32 -
1 (A) Renovations and ADA accessibility 2 improvements to a gymnasium 1,000,000 3 (B) Renovations and upgrades to the 4 Rollins Student Center 1,351,000 5 (C) Construction of a classroom and 6 faculty office building 8,000,000 7 (xiii) Butler County Community College 8 (A) Infrastructure, construction and 9 renovation of the Beck Library and 10 Learning Resource Center 2,000,000 11 (xiv) Harrisburg Area Community College 12 (A) Acquisition, construction and other 13 related costs for community college 14 campus development in York County 30,000,000 15 (6) Department of Environmental Protection 16 (i) Allegheny County 17 (A) Wet Weather Overflow Control 18 Demonstration Facilities in Millvale 19 and Munhall Boroughs 5,000,000 20 (Base Project Allocation - $4,000,000) 21 (Design and Contingencies - $1,000,000) 22 (B) Municipal sewer stream removal 23 programs 5,000,000 24 (Base Project Allocation - $4,000,000) 25 (Design and Contingencies - $1,000,000) 26 (C) PINE CREEK WATERSHED, STORMWATER <-- 27 MANAGEMENT AND FLOOD PROTECTION FOR 28 LOWER ALLISON PARK 4,623,000 29 (i.1) Blair County 30 (A) Construction, infrastructure and other 20070H1589B4129 - 33 -
1 related costs for the Mill Run 2 rehabilitation project 76,000 3 (ii) Bucks County 4 (A) Construction, infrastructure and other 5 related costs for Bristol Borough flood 6 protection project 3,000,000 7 (B) Construction, infrastructure and other 8 related costs for the flood control and 9 protection project in the Newportville 10 section of Bristol Township 1,000,000 11 (iii) Cambria County 12 (A) Additional funds for rehabilitation of 13 the Patton flood protection project in 14 the Borough of Patton 4,800,000 15 (Base Project Allocation - $4,000,000) 16 (Design and Contingencies - $800,000) 17 (B) Construct Lancashire No.15 acid mine 18 drainage treatment plant to improve an 19 estimated 25 miles of the west branch 20 of the Susquehanna River 10,025,000 21 (Base Project Allocation - $10,025,000) 22 (C) ADDITIONAL FUNDS FOR THE WILMORE FLOOD <-- 23 PROTECTION PROJECT, CONSTRUCTION OF A 24 COMPACT LEVEE ALONG THE NORTH BRANCH OF 25 THE LITTLE CONEMAUGH RIVER 2,400,000 26 (BASE PROJECT ALLOCATION - $2,000,000) 27 (DESIGN AND CONTINGENCIES - $400,000) 28 (iv) Chester County 29 (A) Construction, infrastructure and other 30 related costs for the Business 30 flood 20070H1589B4129 - 34 -
1 control project 900,000 2 (v) Clearfield County 3 (A) Construction and other related costs 4 for stream channel clearing and 5 restoration in Curwensville Borough 5,000,000 6 (vi) Clearfield and/or Cambria County 7 (A) Construct active acid mine drainage 8 facility for currently untreated mine 9 pool discharge in the Susquehanna River 10 basin to offset agricultural 11 consumptive use demands 6,000,000 12 (Base Project Allocation - $6,000,000) 13 (vii) Clearfield and Elk Counties 14 (A) Construct active acid mine drainage 15 facility near the Village of Hollywood, 16 Huston Township, Clearfield County, to 17 restore water quality in the Bennett 18 Branch Sinnemahoning Creek in support 19 of the PA Wilds initiative 12,125,000 20 (Base Project Allocation - $12,125,000) 21 (viii) Clinton County 22 (A) Chatham Run flood protection, 23 including repairs to levees along 24 Chatham Run through Pine Creek in Pine 25 Creek Township 7,500,000 26 (viii.1) Columbia County 27 (A) Construction, infrastructure and other 28 related costs for Fishing Creek flood 29 control project, including gravel bar 30 removal 1,000,000 20070H1589B4129 - 35 -
1 (viii.2) Dauphin County 2 (A) Stormwater control project in Lower 3 Swatara Township 6,000,000 4 (B) Stormwater control project in Derry 5 Township 8,000,000 6 (ix) Delaware County 7 (A) Construction, infrastructure and other 8 related costs for Edgemount Square in 9 Newtown Township - stormwater 10 management project 300,000 11 (B) Construction, infrastructure and other 12 related costs for the Radnor Middle 13 School stormwater management project 300,000 14 (C) Construction, infrastructure and other 15 related costs for stormwater management 16 in Ridley Township 500,000 17 (IX.1) FAYETTE COUNTY <-- 18 (A) ADDITIONAL FUNDS FOR DGS PROJECT 180- 19 23, ADDITIONAL CHANNEL WORK, ADDING A 20 FLOOD WALL AND STABILIZING STREAMBANKS 21 IN DUNBAR BOROUGH 1,200,000 22 (BASE PROJECT ALLOCATION - $1,000,000) 23 (DESIGN AND CONTINGENCIES - $200,000) 24 (x) Fulton County 25 (A) Reconstruct two streams currently 26 flowing into abandoned surface mine 27 pits in order to restore the natural 28 stream flow to the Great Trough Creek 2,000,000 29 (Base Project Allocation - $2,000,000) 30 (xi) Greene County 20070H1589B4129 - 36 -
1 (A) Construction, infrastructure and other 2 related costs for Wisecarver Dam 3 rehabilitation in Franklin Township 1,500,000 4 (xii) Indiana County 5 (A) Construct active acid mine drainage 6 facility near the abandoned Wehrum 7 shaft to treat discharges from two 8 abandoned mine complexes discharging to 9 Blacklick Creek 6,000,000 10 (Base Project Allocation - $6,000,000) 11 (xiii) Luzerne County 12 (A) Additional funds for DGS Project 184- 13 23 Mill Creek flood protection project 14 in Avoca and Dupont Boroughs 6,000,000 15 (Base Project Allocation - $5,000,000) 16 (Design and Contingencies - $1,000,000) 17 (B) Rehabilitation of DGS Project 180-37 18 Wade Run stream improvement project in 19 the Borough of Swoyersville 1,200,000 20 (Base Project Allocation - $1,000,000) 21 (Design and Contingencies - $200,000) 22 (C) Construction, infrastructure and other 23 related costs for Ashley Solomon Creek 24 Tunnel Project 750,000 25 (xiv) Lycoming County 26 (A) Design, infrastructure and 27 construction of cost-effective and 28 affordable flood protection measures 29 along the Loyalsock Creek within the 30 Borough of Montoursville 7,500,000 20070H1589B4129 - 37 -
1 (B) Design, infrastructure and 2 construction of flood mitigation 3 protection measures along the Lycoming 4 Creek within Old Lycoming, Lycoming and 5 Loyalsock Townships 11,000,000 6 (xv) McKean County 7 (A) Construction of a flood mitigation 8 project on the Allegheny River in the 9 Borough of Port Allegany 1,000,000 10 (xvi) Monroe County 11 (A) Infrastructure improvements and 12 construction for dike at Laird 13 Technologies building, Delaware Water 14 Gap 6,000,000 15 (B) Flood control project in Paradise 16 Township 1,500,000 17 (xvii) Montgomery County 18 (A) Additional funds for DGS Project 181- 19 5, construction and other related costs 20 for Ardsley drainage project in Upper 21 Dublin Township 2,400,000 22 (Base Project Allocation - $2,000,000) 23 (Design and Contingencies - $400,000) 24 (xvii.1) Montour County 25 (A) Additional funds for DGS Project 181- 26 05, Danville Flood Protection Project 27 Phase II, closure structures for Route 28 11 and railroad bridge 4,800,000 <-- 29 11 AND RAILROAD BRIDGE, PLUS REMEDIAL <-- 30 MEASURES TO EXISTING LEVEE PROJECT 8,400,000 20070H1589B4129 - 38 -
1 (xviii) Northampton County 2 (A) Repair and restoration of south 3 Bethlehem flood control system 500,000 4 (xix) Northumberland County 5 (A) Construction, infrastructure and other 6 related costs for the Susquehanna River 7 clearing and grubbing project 200,000 8 (B) Construction, infrastructure and other 9 related costs for the Reagan Street 10 Underpass flood abatement project 2,200,000 11 (C) Shoreline stabilization for flood 12 control system in Sunbury Borough 750,000 13 (xx) Somerset County 14 (A) Construction, infrastructure and other 15 related costs for the East Main Street 16 flood protection project 5,000,000 17 (xxi) Wayne County 18 (A) Survey and analyze existing Ridge and 19 Terrace stormwater system and develop 20 alternative stormwater concepts 60,000 21 (xxii) Westmoreland County 22 (A) Additional funds for DGS Project No. 23 180-43, Northmont Street area flood 24 protection project in the City of 25 Greensburg 3,600,000 26 (B) ADDITIONAL FUNDS FOR DGS PROJECT 182- <-- 27 07, PHASE 2, REHABILITATION OF EXISTING 28 LEVEE AND NEW FLOOD WALLS ALONG BRUSH 29 CREEK IN THE CITY OF JEANNETTE 3,600,000 30 (BASE PROJECT ALLOCATION - $3,000,000) 20070H1589B4129 - 39 -
1 (DESIGN AND CONTINGENCIES - $600,000) 2 (C) EXPORT/MURRYSVILLE FLOOD CONTROL 3 PROJECT, PHASE 2, EXCAVATION, EXPANSION 4 AND RECONSTRUCTION OF EXISTING DAM 5 LOCATED NEAR THE BORDER OF EXPORT VIA 6 PUCKETY DRIVE FOR TURTLE CREEK FLOOD 7 CONTROL 6,000,000 8 (7) Department of General Services 9 (i) Bucks County 10 (A) Design and construction of a Multi- 11 Agency Emergency Operations Center 35,000,000 12 (Base Project Allocation - $28,000,000) 13 (Design and Contingencies - $7,000,000) 14 (ii) Dauphin County 15 (A) Provide for steam plant replacements 16 and upgrades in Capitol Annex 1,563,000 17 (Base Project Allocation - $1,250,000) 18 (Design and Contingencies - $313,000) 19 (B) Provide for remediation of mold, 20 asbestos and other hazmat in buildings 21 and equipment areas in Capitol Annex 5,625,000 22 (Base Project Allocation - $4,500,000) 23 (Design and Contingencies - $1,125,000) 24 (C) Upgrade building heating system and 25 install new air conditioning system in 26 Capitol Annex 3,750,000 27 (Base Project Allocation - $3,000,000) 28 (Design and Contingencies - $750,000) 29 (D) Replace main Capitol Complex 30 Substation switchgears including 20070H1589B4129 - 40 -
1 control status board along with 2 transformers and circuit breakers 25,000,000 3 (Base Project Allocation - $20,000,000) 4 (Design and Contingencies - $5,000,000) 5 (E) Replace existing 15kv distribution 6 feeders throughout the Capitol Complex 7 and reset the system primary and 8 secondary circuit breakers for proper 9 overall system coordination 10,625,000 10 (Base Project Allocation - $8,500,000) 11 (Design and Contingencies - $2,125,000) 12 (F) Refurbish Capital Park by providing 13 for a new retaining wall along Walnut 14 Street including new grading and 15 installation of a water conduction 16 system 1,000,000 17 (Base Project Allocation - $750,000) 18 (Design and Contingencies - $250,000) 19 (G) Replace all cloth ceilings in halls of 20 the Capitol East Wing 1,000,000 21 (Base Project Allocation - $750,000) 22 (Design and Contingencies - $250,000) 23 (H) Replace existing macadam with new 24 covering and sealant to prevent water 25 leakage and replace drains and piping 26 at the parking facility at 22nd and 27 Forster Streets, Harrisburg 1,100,000 28 (Base Project Allocation - $880,000) 29 (Design and Contingencies - $220,000) 30 (I) Repair the roof membrane and replace 20070H1589B4129 - 41 -
1 broken pavers at the Rachel Carson 2 State Office Building 750,000 3 (Base Project Allocation - $600,000) 4 (Design and Contingencies - $150,000) 5 (J) Provide for a Capitol Complex - 6 Capital Rehabilitation and Improvements 7 Program 25,000,000 8 (Base Project Allocation - $20,000,000) 9 (Design and Contingencies - $5,000,000) 10 (K) Design and construction of a Multi- 11 Agency Emergency Operations Center 35,000,000 12 (Base Project Allocation - $28,000,000) 13 (Design and Contingencies - $7,000,000) 14 (L) Construction, improvements and other 15 costs related to the Forum Building 101,400,000 16 (M) REPLACE HIGH-VOLTAGE SWITCHGEAR AND <-- 17 RELATED COMPONENTS IN AGRICULTURE 18 BUILDING 2,000,000 19 (BASE PROJECT ALLOCATION - $2,000,000) 20 (N) REPLACE PLAZA DRAINS, BASINS AND 21 RESPECTIVE LINERS AT CAPITOL EAST WING 1,000,000 22 (BASE PROJECT ALLOCATION - $1,000,000) 23 (O) REPLACE CURRENT BOILER WITH A MORE 24 EFFICIENT NEW BOILER WITH CAPACITY FOR 25 FUTURE GROWTH AT CAPITOL ANNEX 750,000 26 (BASE PROJECT ALLOCATION - $750,000) 27 (P) REMEDIATE ASBESTOS AND MOLD IN VARIOUS 28 BUILDINGS AND AREAS THROUGHOUT THE 29 CAPITOL ANNEX COMPLEX 4,500,000 30 (BASE PROJECT ALLOCATION - $4,500,000) 20070H1589B4129 - 42 -
1 (Q) REPLACE ALL ELECTRICAL PANELS AND 2 REWIRE THE FORUM BUILDING TO FULLY 3 OCCUPY THE BUILDING 1,000,000 4 (BASE PROJECT ALLOCATION - $1,000,000) 5 (R) INSTALL SPRINKLER SYSTEM AND UPGRADE 6 FIRE PANELS IN THE FORUM BUILDING TO 7 INCLUDE ENUNCIATORS FOR BETTER 8 EFFICIENCY 500,000 9 (BASE PROJECT ALLOCATION - $500,000) 10 (S) CONNECT THE FORUM BUILDING TO THE 11 CENTRAL PLANT FOR HEATING AND COOLING 5,000,000 12 (BASE PROJECT ALLOCATION - $5,000,000) 13 (T) RENOVATE AND REFURBISH ALL BUILDING 14 RESTROOMS IN THE FORUM BUILDING WITH 15 NEW FIXTURES AND PLUMBING TO MEET 16 MODERN CODES 1,000,000 17 (BASE PROJECT ALLOCATION - $1,000,000) 18 (U) CLEAN AND SANITIZE ALL HVAC DUCTWORK 19 IN THE HEALTH AND WELFARE BUILDING TO 20 PREVENT MICROBIAL GROWTH AND GERMS FROM 21 INFILTRATION 400,000 22 (BASE PROJECT ALLOCATION - $400,000) 23 (V) INSTALL SPRINKLER SYSTEM AND 24 FIRE/EVACUATION ALARM PANELS MONITORED 25 BY THE CAPITOL POLICE COMMUNICATIONS 26 CENTER AT THE 18TH AND HERR STREET 27 TRADE SHOPS 350,000 28 (BASE PROJECT ALLOCATION - $350,000) 29 (W) REMEDIATE ASBESTOS-LADEN TILES 30 THROUGHOUT THE 22ND AND FORSTER STREET 20070H1589B4129 - 43 -
1 STATE OFFICE BUILDING 200,000 2 (BASE PROJECT ALLOCATION - $200,000) 3 (ii.1) Irvis Office Building 4 (A) Construction, infrastructure and other 5 related costs to renovate the Irvis 6 Office Building 45,000,000 7 (Base Project Allocation - $40,000,000) 8 (Design and Contingencies - $5,000,000) 9 (iii) Lebanon County 10 (A) Design and construction of a Multi- 11 Agency Emergency Operations Center 35,000,000 12 (Base Project Allocation - $28,000,000) 13 (Design and Contingencies - $7,000,000) 14 (iv) Philadelphia County 15 (A) Development and construction of the 16 Mill Creek Community Center 12,000,000 17 (B) Demolition and abatement costs 18 associated with the Paschall Homes 19 redevelopment project 8,600,000 20 (C) Engineering research and extension 21 building 30,000,000 22 (D) Infrastructure improvements for the 23 former Liddonfield Homes at Torresdale 24 Avenue and Jackson Place 10,000,000 25 (E) Acquisition of site, design, 26 construction, infrastructure and other 27 related costs for a facility to be 28 located at 15th and Arch Streets to be 29 leased by the Department of General 30 Services to the City of Philadelphia 20070H1589B4129 - 44 -
1 for fair market value for use by the <-- 2 First Judicial District for a family 3 court building 200,000,000 <-- 4 COURT BUILDING, PROVIDED THAT THE CITY <-- 5 OF PHILADELPHIA WILL CONTINUE TO 6 SUPPORT THE HOUSING OF THE FAMILY COURT 7 IN AN AMOUNT EQUAL TO CURRENT 8 EXPENDITURES FOR UTILITIES AND 9 MAINTENANCE, SO THAT THE IMPACT OF THE 10 NEW FACILITY WILL BE REVENUE NEUTRAL TO 11 THE CITY OF PHILADELPHIA 200,000,000 12 (F) Infrastructure and improvements, 13 including streetscape and other related 14 costs for development project 10,000,000 15 (8) Pennsylvania Historical and Museum Commission 16 (i) Daniel Boone Homestead 17 (A) Provide for site improvements and 18 restore the boyhood home of Daniel 19 Boone 960,000 20 (Base Project Allocation - $800,000) 21 (Design and Contingencies - $160,000) 22 (I.1) ERIE MARITIME MUSEUM <-- 23 (A) RESTORE US BRIG NIAGARA, INCLUDING 24 HULL, KEEL, PLANKING, FRAME AND RAILS 4,800,000 25 (BASE PROJECT ALLOCATION - $4,000,000) 26 (DESIGN AND CONTINGENCIES - $800,000) 27 (ii) Landis Valley Museum 28 (A) Provide for the design and 29 construction of a new maintenance 30 building 960,000 20070H1589B4129 - 45 -
1 (Base Project Allocation - $800,000) 2 (Design and Contingencies - $160,000) 3 (B) PARTIALLY RENOVATE AND CONSTRUCT NEW <-- 4 VISITORS' CENTER, INCLUDING 5 INFRASTRUCTURE 12,000,000 6 (BASE PROJECT ALLOCATION - $10,000,000) 7 (DESIGN AND CONTINGENCIES - $2,000,000) 8 (iii) Pennsbury Manor 9 (A) Rehabilitate up to 23 buildings and 10 site development of infrastructure 11 throughout the site 1,920,000 12 (Base Project Allocation - $1,600,000) 13 (Design and Contingencies - $320,000) 14 (iv) Pennsylvania Lumber Museum 15 (A) Reconfigure entrance to the building 16 to permit one coordinated exhibit 17 gallery rather than two disjointed 18 galleries 2,400,000 19 (Base Project Allocation - $2,000,000) 20 (Design and Contingencies - $400,000) 21 (9) Department of Military and Veterans Affairs 22 (i) Pittsburgh Hunt Readiness Center, 23 Allegheny County 24 (A) Rehabilitate readiness center 25 including assembly hall, classrooms, 26 administrative offices, storage spaces, 27 restrooms, locker rooms and mechanical 28 rooms 3,000,000 29 (Base Project Allocation - $2,400,000) 30 (Design and Contingencies - $600,000) 20070H1589B4129 - 46 -
1 (I.1) PITTSBURGH-CRANE READINESS CENTER, <-- 2 ALLEGHENY COUNTY 3 (A) REHABILITATE THE PITTSBURGH READINESS 4 CENTER TO ENHANCE STATE MILITARY 5 READINESS WITH ADEQUATE FACILITIES TO 6 INCLUDE ASSEMBLY HALL, DINING FACILITY, 7 CLASSROOMS, ADMINISTRATION OFFICES, 8 STORAGE SPACE, REST ROOMS, LOCKER ROOMS 9 AND MECHANICAL ROOM 4,000,000 10 (BASE PROJECT ALLOCATION - $3,200,000) 11 (DESIGN AND CONTINGENCIES - $800,000) 12 (ii) Southwestern Veterans Center, Allegheny 13 County 14 (A) Replace sewer main 331,000 15 (Base Project Allocation - $248,000) 16 (Design and Contingencies - $83,000) 17 (iii) Hollidaysburg Veterans Home, Blair 18 County 19 (A) Rehabilitate fire alarm and sprinkler 20 systems in Arnold, Dietary, Eisenhower 21 and MacArthur Halls to meet life safety 22 compliance 2,722,000 23 (Base Project Allocation - $2,268,000) 24 (Design and Contingencies - $454,000) 25 (III.1) LOCK HAVEN READINESS CENTER, CLINTON <-- 26 COUNTY 27 (A) REHABILITATE THE LOCK HAVEN READINESS 28 CENTER TO ENHANCE STATE MILITARY 29 READINESS WITH ADEQUATE FACILITIES TO 30 INCLUDE ASSEMBLY HALL, DINING FACILITY, 20070H1589B4129 - 47 -
1 CLASSROOMS, ADMINISTRATION OFFICES, 2 STORAGE SPACE, REST ROOMS, LOCKER ROOMS 3 AND MECHANICAL ROOM 4,000,000 4 (BASE PROJECT ALLOCATION - $3,200,000) 5 (DESIGN AND CONTINGENCIES - $800,000) 6 (iv) Harrisburg Military Post, Dauphin County 7 (A) Rehabilitate various buildings and 8 facilities on the military post 9 including assembly halls, classrooms, 10 administrative offices, storage spaces, 11 restrooms, locker rooms, mechanical 12 rooms and expanded parking 6,000,000 13 (Base Project Allocation - $4,800,000) 14 (Design and Contingencies - $1,200,000) 15 (IV.1) NEW CASTLE READINESS CENTER, LAWRENCE <-- 16 COUNTY 17 (A) REHABILITATE THE NEW CASTLE READINESS 18 CENTER TO ENHANCE STATE MILITARY 19 READINESS WITH ADEQUATE FACILITIES TO 20 INCLUDE ASSEMBLY HALL, DINING FACILITY, 21 CLASSROOMS, ADMINISTRATION OFFICES, 22 STORAGE SPACE, REST ROOMS, LOCKER ROOMS 23 AND MECHANICAL ROOM 4,000,000 24 (BASE PROJECT ALLOCATION - $3,200,000) 25 (DESIGN AND CONTINGENCIES - $800,000) 26 (IV.2) ALLENTOWN READINESS CENTER, LEHIGH 27 COUNTY 28 (A) REHABILITATE THE ALLENTOWN READINESS 29 CENTER TO ENHANCE STATE MILITARY 30 READINESS WITH ADEQUATE FACILITIES TO 20070H1589B4129 - 48 -
1 INCLUDE ASSEMBLY HALL, DINING FACILITY, 2 CLASSROOMS, ADMINISTRATION OFFICES, 3 STORAGE SPACE, REST ROOMS, LOCKER ROOMS 4 AND MECHANICAL ROOM 5,000,000 5 (BASE PROJECT ALLOCATION - $4,200,000) 6 (DESIGN AND CONTINGENCIES - $800,000) 7 (v) Wilkes-Barre Readiness Center, Luzerne 8 County 9 (A) Rehabilitate readiness center 10 including assembly hall, classrooms, 11 administrative offices, storage spaces, 12 restrooms, locker rooms, mechanical 13 rooms and rehabilitation and expansion 14 of parking 4,000,000 15 (Base Project Allocation - $3,200,000) 16 (Design and Contingencies - $800,000) 17 (V.1) PLYMOUTH READINESS CENTER, LUZERNE <-- 18 COUNTY 19 (A) REHABILITATE THE PLYMOUTH READINESS 20 CENTER TO ENHANCE STATE MILITARY 21 READINESS WITH ADEQUATE FACILITIES TO 22 INCLUDE ASSEMBLY HALL, DINING FACILITY, 23 CLASSROOMS, ADMINISTRATION OFFICES, 24 STORAGE SPACE, REST ROOMS, LOCKER ROOMS 25 AND MECHANICAL ROOM 4,000,000 26 (BASE PROJECT ALLOCATION - $3,200,000) 27 (DESIGN AND CONTINGENCIES - $800,000) 28 (vi) Hermitage Readiness Center, Mercer County 29 (A) Additional funding to support 30 construction of new Pennsylvania 20070H1589B4129 - 49 -
1 National Guard Readiness Center (DGS 2 Project 963-16) 750,000 3 (Base Project Allocation - $605,000) 4 (Design and Contingencies - $145,000) 5 (vii) Southeastern Veterans Center, Montgomery 6 County 7 (A) Rehabilitate fire alarm and sprinkler 8 systems to meet life safety compliance 1,276,000 9 (Base Project Allocation - $1,063,000) 10 (Design and Contingencies - $213,000) 11 (viii) Easton Readiness Center, Northampton 12 County 13 (A) Additional funding to support 14 construction of new Pennsylvania 15 National Guard Readiness Center (DGS 16 Project 961-9) 800,000 17 (Base Project Allocation - $600,000) 18 (Design and Contingencies - $200,000) 19 (ix) Philadelphia Lancaster Avenue Readiness 20 Center, Philadelphia County 21 (A) Rehabilitate readiness center to 22 include assembly hall, classrooms, 23 administrative offices, storage spaces, 24 restrooms, locker rooms and mechanical 25 rooms 6,000,000 26 (Base Project Allocation - $5,000,000) 27 (Design and Contingencies - $1,000,000) 28 (x) Philadelphia Southampton Road Armory, 29 Philadelphia County 30 (A) Replace several air handling units and 20070H1589B4129 - 50 -
1 associated pumps and motors and install 2 new chiller with ice storage capacity 3 to be made at night that will 4 distribute cooling during the day 1,500,000 5 (Base Project Allocation - $1,300,000) 6 (Design and Contingencies - $200,000) 7 (X.1) WASHINGTON READINESS CENTER, WASHINGTON <-- 8 COUNTY 9 (A) REHABILITATE THE WASHINGTON READINESS 10 CENTER TO ENHANCE STATE MILITARY 11 READINESS WITH ADEQUATE FACILITIES TO 12 INCLUDE ASSEMBLY HALL, DINING FACILITY, 13 CLASSROOMS, ADMINISTRATION OFFICES, 14 STORAGE SPACE, REST ROOMS, LOCKER ROOMS 15 AND MECHANICAL ROOM 5,000,000 16 (BASE PROJECT ALLOCATION - $4,200,000) 17 (DESIGN AND CONTINGENCIES - $800,000) 18 (xi) Southeastern Veterans Center, Chester 19 County 20 (A) Additional funds for DGS project 960- 21 55 6,000,000 22 (xii) Dauphin or Lebanon County 23 (A) Construction of a new veterans' home 24 to be located in Dauphin or Lebanon 25 County, including land acquisition 87,000,000 26 (Base Project Allocation - $75,000,000) 27 (Land Allocation - $12,000,000) 28 (XIII) LEBANON COUNTY <-- 29 (A) ADDITIONAL FUNDS TO CONSTRUCT 30 IMPROVEMENTS TO EXISTING FACILITY AT 20070H1589B4129 - 51 -
1 FORT INDIANTOWN GAP 735,000 2 (BASE PROJECT ALLOCATION - $698,000) 3 (DESIGN AND CONTINGENCIES - $37,000) 4 (10) Department of Public Welfare 5 (i) Allentown State Hospital 6 (A) Upgrade three coal boilers currently 7 in poor condition and replace traveling 8 grate stokers and controls 3,600,000 9 (Base Project Allocation - $3,000,000) 10 (Design and Contingencies - $600,000) 11 (B) RENOVATE EXISTING WATER DISTRIBUTION <-- 12 SYSTEM TO DOMESTIC WATER SUPPLY AND 13 FIRE HYDRANT/SPRINKLER SUPPLY LINES 5,760,000 14 (BASE PROJECT ALLOCATION - $4,800,000) 15 (DESIGN AND CONTINGENCIES - $960,000) 16 (ii) Clarks Summit State Hospital 17 (A) Replace the electrical distribution 18 center at the sewage treatment plant 19 and install new 400 amp service, motor 20 control center, new transformer and new 21 back-up supply 1,200,000 22 (Base Project Allocation - $1,000,000) 23 (Design and Contingencies - $200,000) 24 (ii.1) Danville State Hospital 25 (A) Additional funds for DGS Project 503- 26 15, exterior improvements to block 27 building 2,160,000 28 (Base Project Allocation - $1,800,000) 29 (Design and Contingencies - $360,000) 30 (iii) Ebensburg Center 20070H1589B4129 - 52 -
1 (A) Replace all roofed areas which cover 2 residential housing units 1,440,000 3 (Base Project Allocation - $1,200,000) 4 (Design and Contingencies - $240,000) 5 (B) Replace current emergency generators 6 with stand alone outside units in all 7 seven residential units 1,500,000 8 (Base Project Allocation - $1,250,000) 9 (Design and Contingencies - $250,000) 10 (iv) Loysville Youth Development Center 11 (A) Construct a modular multipurpose 12 gym/kitchen/classroom building 3,000,000 13 (Base Project Allocation - $2,500,000) 14 (Design and Contingencies - $500,000) 15 (B) ADDITIONAL FUNDS FOR DGS PROJECT 588- <-- 16 9, CONSTRUCTION OF WATER FILTRATION 17 SYSTEM 540,000 18 (BASE PROJECT ALLOCATION - $450,000) 19 (DESIGN AND CONTINGENCIES - $90,000) 20 (v) Loysville Complex, South Mountain Secure 21 Treatment Unit 22 (A) Construct a modular multipurpose 23 gym/kitchen/classroom building 3,000,000 24 (Base Project Allocation - $2,500,000) 25 (Design and Contingencies - $500,000) 26 (vi) Mayview State Hospital 27 (A) Upgrade the primary electrical system 28 including all central feeder circuits 3,000,000 29 (Base Project Allocation - $2,500,000) 30 (Design and Contingencies - $500,000) 20070H1589B4129 - 53 -
1 (VI.1) NEW CASTLE YOUTH DEVELOPMENT CENTER <-- 2 (A) UPGRADE HVAC SYSTEM TO REDUCE EXTREME 3 HEAT AND HUMIDITY FOR RESIDENTS 990,000 4 (BASE PROJECT ALLOCATION - $825,000) 5 (DESIGN AND CONTINGENCIES - $165,000) 6 (vii) Norristown State Hospital 7 (A) Renovate the boiler plant for building 8 60, Phase 3 of DGS project 509-29, 9 reconstruction or replacement of 10 boilers to meet emissions requirements 11 and upgrade the steam distribution 12 system 1,800,000 13 (Base Project Allocation - $1,500,000) 14 (Design and Contingencies - $300,000) 15 (viii) Polk Center 16 (A) Replace valves, backwash pump and 17 replenish filters with new media in 18 order to keep water plant in compliance 19 with regulations 1,400,000 20 (Base Project Allocation - $1,120,000) 21 (Design and Contingencies - $280,000) 22 (ix) Selinsgrove Center 23 (A) Upgrade the boiler controls for the 24 facility 600,000 25 (Base Project Allocation - $500,000) 26 (Design and Contingencies - $100,000) 27 (B) Purchase and install package boiler 28 for more efficient handling of summer 29 steam load 960,000 30 (Base Project Allocation - $800,000) 20070H1589B4129 - 54 -
1 (Design and Contingencies - $160,000) 2 (x) South Mountain Restoration Center 3 (A) Purchase and install package boiler 4 for more efficient handling of summer 5 steam load 840,000 6 (Base Project Allocation - $700,000) 7 (Design and Contingencies - $140,000) 8 (xi) Torrance State Hospital 9 (A) Bore two horizontal wells into a 10 mountainside to expand and improve 11 freshwater collection 720,000 12 (Base Project Allocation - $600,000) 13 (Design and Contingencies - $120,000) 14 (B) UPGRADE EXISTING COAL-FIRED BOILER IN <-- 15 ORDER TO COMPLY WITH EMISSION 16 GUIDELINES AND ENHANCE COAL BOILERS 17 WITH NATURAL GAS 6,600,000 18 (BASE PROJECT ALLOCATION - $5,500,000) 19 (DESIGN AND CONTINGENCIES - $1,100,000) 20 (xii) Wernersville State Hospital 21 (A) Upgrade coal boiler refractory and 22 structural components 360,000 23 (Base Project Allocation - $300,000) 24 (Design and Contingencies - $60,000) 25 (B) RENOVATE PATIENT BATHROOMS, INCLUDING <-- 26 PIPING FIXTURES TO COMPLY WITH ADA 27 ACCOMMODATIONS 600,000 28 (BASE PROJECT ALLOCATION - $500,000) 29 (DESIGN AND CONTINGENCIES - $100,000) 30 (xiii) White Haven Center 20070H1589B4129 - 55 -
1 (A) Replace the heating systems in 2 residential buildings from existing old 3 radiant heat to more modern, digitally- 4 controlled, high-efficiency HVAC 5 systems 2,400,000 6 (Base Project Allocation - $2,000,000) 7 (Design and Contingencies - $400,000) 8 (10.1) Pennsylvania Emergency Management Agency 9 (i) Dauphin County 10 (A) Construction, land acquisition, 11 infrastructure development and other 12 related costs for office space 50,000,000 13 (ii) Lebanon County 14 (A) Construction, land acquisition, 15 infrastructure development and other 16 related costs for office space 50,000,000 17 (II.1) MIFFLIN COUNTY <-- 18 (A) DESIGN AND PURCHASE NEW STATE-OF-THE- 19 ART EQUIPMENT FOR THE STATE FIRE 20 TRAINING ACADEMY TO REPLACE CURRENT 21 OUTDATED APPARATUS AND FIXTURES 2,000,000 22 (BASE PROJECT ALLOCATION - $1,600,000) 23 (DESIGN AND CONTINGENCIES - $400,000) 24 (B) DESIGN AND CONSTRUCT THERMAL LINING IN 25 THE AREAS OF THE BURN FACILITY THAT 26 WERE NOT FINISHED IN THE ORIGINAL 27 PROJECT TO EXTEND THE USEFUL LIFE OF 28 THE BUILDING 1,500,000 29 (BASE PROJECT ALLOCATION - $1,200,000) 30 (DESIGN AND CONTINGENCIES - $300,000) 20070H1589B4129 - 56 -
1 (iii) Pennsylvania State Firefighters' 2 Memorial 3 (A) Acquisition, infrastructure, 4 construction and other related costs 5 for construction of a State 6 Firefighters Memorial at a location to 7 be determined by the State Fire 8 Commissioner 500,000 9 (11) Pennsylvania State Police 10 (i) Dunmore Headquarters, Lackawanna County 11 (A) Construct a new headquarters facility, 12 garage and hangar to replace existing 13 facilities in Lackawanna County 10,800,000 14 (Base Project Allocation - $9,000,000) 15 (Design and Contingencies - $1,800,000) 16 (ii) Philadelphia Headquarters, Philadelphia 17 (A) Renovation and expansion of 18 Philadelphia Headquarters, including 19 land acquisition and construction 26,000,000 20 (12) State System of Higher Education 21 (i) Bloomsburg University of Pennsylvania 22 (A) Additional funding for the renovation 23 of the Nelson Field House while 24 providing additional athletic and 25 office space 1,000,000 26 (B) Additional funds for renovation of the 27 Waller Administration Building 6,000,000 28 (ii) Cheyney University of Pennsylvania 29 (A) Additional funding to replace Browne 30 Hall including upgrading infrastructure 20070H1589B4129 - 57 -
1 according to modern codes and fire 2 safety code requirements 1,000,000 3 (B) Additional funds for renovation of 4 Carver Science Building 6,000,000 5 (C) Funding for ADA modifications 8,000,000 6 (D) Wastewater treatment plant upgrades 10,000,000 7 (E) Additional funds for the construction 8 of new student housing 25,000,000 9 (F) Additional funds for DGS project 403- 10 72, utility and infrastructure 11 renovations 3,500,000 12 (G) Additional funds for DGS project 403- 13 66, renovations to Biddle Hall 400,000 14 (H) Additional funds for DGS project 403- 15 76, renovations to Humphreys Hall 5,000,000 16 (iii) California University of Pennsylvania 17 (A) Construction and other related costs 18 to upgrade university stadium 19 facilities 250,000 <-- 20 FACILITIES 350,000 <-- 21 (B) High-voltage upgrades 4,000,000 22 (C) Renovation of Keystone Hall 13,000,000 23 (D) Additional funds for pedestrian and 24 vehicular enhancements, Phase I 2,000,000 25 (iv) East Stroudsburg University of 26 Pennsylvania 27 (A) Additional funding for the replacement 28 of Rosenkrans Hall, providing 29 additional classroom, laboratory and 30 office space 9,000,000 20070H1589B4129 - 58 -
1 (B) Construction and other costs related 2 to the East Stroudsburg University 3 Conference Center 2,000,000 4 (C) Construction and other related costs 5 to build a parking deck to serve East 6 Stroudsburg University and Pocono 7 Medical Center 3,500,000 8 (D) Additional funds for addition and 9 renovation of Eiler-Martin Stadium 5,000,000 10 (E) Renovation of football stadium and 11 press box 3,000,000 12 (F) Expansion and renovation of field 13 house 3,000,000 14 (v) Edinboro University of Pennsylvania 15 (A) Renovate or replace Ross Hall 16 including infrastructure and exterior 17 surfaces 18,000,000 18 (B) Additional funds for maintenance 19 building replacement 8,000,000 20 (C) Construction of an air-supported, 21 dome-shaped indoor practice and 22 recreation facility 3,400,000 23 (vi) Lock Haven University of Pennsylvania 24 (A) Construction and other costs 25 associated with building a new indoor 26 athletic facility at the Lock Haven 27 University Clearfield campus 10,000,000 28 (vii) Clarion University of Pennsylvania 29 (A) Additional funds for modification of 30 facilities for ADA compliance 3,000,000 20070H1589B4129 - 59 -
1 (B) Additional funds for addition and 2 renovation of Marwick Boyd Fine Arts 3 Center 12,000,000 4 (C) Renovation and expansion of Tippin 5 Gymnasium 40,000,000 6 (viii) Indiana University of Pennsylvania 7 (A) Additional funds for renovation of 8 Leonard Hall 7,000,000 9 (B) Renovation of Stabley Library 7,000,000 10 (C) Construction, redevelopment and other 11 costs related to improvements to 12 athletic facilities 5,000,000 13 (ix) Kutztown University of Pennsylvania 14 (A) Replacement of south bleachers in the 15 football stadium 1,000,000 16 (B) Additional funds for upgrade of 17 Keystone Hall 16,000,000 18 (C) Replacement of Lytle Hall 30,000,000 19 (D) Renovations and construction of the 20 Poplar House to house the Institute for 21 Children's Health 3,500,000 22 (E) Installation of a camera security 23 system 2,000,000 24 (F) DEMOLISH, REPLACE AND RELOCATE THE <-- 25 EDUCATIONAL BUILDING TO ADDRESS 26 ENROLLMENT GROWTH 30,000,000 27 (BASE PROJECT ALLOCATION - $24,000,000) 28 (DESIGN AND CONTINGENCIES - $6,000,000) 29 (x) Mansfield University of Pennsylvania 30 (A) Water treatment plant upgrades 6,000,000 20070H1589B4129 - 60 -
1 (xi) Millersville University of Pennsylvania
2 (A) Renovation of Byerly Hall 6,000,000
3 (B) Renovation of Stayer Building 7,000,000
4 (xii) Shippensburg University of Pennsylvania
5 (A) Additional funding for steam
6 distribution system renovation 10,000,000
7 (B) Redevelopment, including construction,
8 infrastructure and acquisition of the
9 Hoffman Mills building 2,500,000
10 (C) Construction and related
11 infrastructure to upgrade Shippensburg
12 University Athletic Complex 5,000,000
13 (D) Replacement of heating and cooling
14 water line 20,000,000
15 (E) Construction of a cooling and hot
16 water plant 30,000,000
17 (xiii) Slippery Rock University of
18 Pennsylvania
19 (A) Additional funds for renovation of
20 Morrow Field House 16,000,000
21 (xiv) West Chester University of Pennsylvania
22 (A) Phase I of campus geothermal utility
23 conversion 10,000,000
24 (B) Renovation of McCarthy Hall 20,000,000
25 (C) Acquisition, infrastructure
26 improvements and construction of
27 Undergraduate Business Center 15,000,000
28 (13) Department of Transportation
29 (i) Clearfield County <--
30 (I) ARMSTRONG COUNTY <--
20070H1589B4129 - 61 -
1 (A) CONSTRUCT OR ACQUIRE NEW ARMSTRONG 2 COUNTY MAINTENANCE FACILITY, INCLUDING 3 SALT AND EQUIPMENT STORAGE BUILDINGS 4 AND SITE DEVELOPMENT 13,800,000 5 (BASE PROJECT ALLOCATION - $11,000,000) 6 (LAND ALLOCATION - $1,000,000) 7 (DESIGN AND CONTINGENCIES - $1,800,000) 8 (I.1) BEAVER COUNTY 9 (A) CONSTRUCT OR ACQUIRE NEW BEAVER COUNTY 10 MAINTENANCE FACILITY, INCLUDING SALT 11 AND EQUIPMENT STORAGE BUILDINGS AND 12 SITE DEVELOPMENT 13,800,000 13 (BASE PROJECT ALLOCATION - $11,000,000) 14 (LAND ALLOCATION - $1,000,000) 15 (DESIGN AND CONTINGENCIES - $1,800,000) 16 (I.2) BERKS COUNTY 17 (A) CONSTRUCT OR ACQUIRE NEW BERKS COUNTY 18 MAINTENANCE FACILITY, INCLUDING SALT 19 AND EQUIPMENT STORAGE BUILDINGS AND 20 SITE DEVELOPMENT 13,800,000 21 (BASE PROJECT ALLOCATION - $11,000,000) 22 (LAND ALLOCATION - $1,000,000) 23 (DESIGN AND CONTINGENCIES - $1,800,000) 24 (I.3) CARBON COUNTY 25 (A) CONSTRUCT OR ACQUIRE NEW CARBON COUNTY 26 MAINTENANCE FACILITY, INCLUDING SALT 27 AND EQUIPMENT STORAGE BUILDINGS AND 28 SITE DEVELOPMENT 13,800,000 29 (BASE PROJECT ALLOCATION - $11,000,000) 30 (LAND ALLOCATION - $1,000,000) 20070H1589B4129 - 62 -
1 (DESIGN AND CONTINGENCIES - $1,800,000)
2 (I.4) CENTRE COUNTY
3 (A) CONSTRUCT OR ACQUIRE NEW CENTRE COUNTY
4 MAINTENANCE FACILITY, INCLUDING SALT
5 AND EQUIPMENT STORAGE BUILDINGS AND
6 SITE DEVELOPMENT 13,800,000
7 (BASE PROJECT ALLOCATION - $11,000,000)
8 (LAND ALLOCATION - $1,000,000)
9 (DESIGN AND CONTINGENCIES - $1,800,000)
10 (I.5) CLEARFIELD COUNTY
11 (A) CONSTRUCT OR ACQUIRE NEW CLEARFIELD
12 COUNTY MAINTENANCE FACILITY, INCLUDING
13 SALT AND EQUIPMENT STORAGE BUILDINGS
14 AND SITE DEVELOPMENT 13,800,000
15 (BASE PROJECT ALLOCATION - $11,000,000)
16 (LAND ALLOCATION - $1,000,000)
17 (DESIGN AND CONTINGENCIES - $1,800,000)
18 (A) (B) Replace or rehabilitate District <--
19 2-0 Office including an addition on
20 current site and infrastructure
21 improvements 12,000,000
22 (Base Project Allocation - $10,000,000)
23 (Design and Contingencies - $2,000,000)
24 (I.6) CRAWFORD COUNTY <--
25 (A) CONSTRUCT OR ACQUIRE NEW CRAWFORD
26 COUNTY MAINTENANCE FACILITY, INCLUDING
27 SALT AND EQUIPMENT STORAGE BUILDINGS
28 AND SITE DEVELOPMENT 13,800,000
29 (BASE PROJECT ALLOCATION - $11,000,000)
30 (LAND ALLOCATION - $1,000,000)
20070H1589B4129 - 63 -
1 (DESIGN AND CONTINGENCIES - $1,800,000) 2 (ii) Dauphin County 3 (A) Construct or acquire a new county 4 maintenance facility including salt and 5 equipment storage buildings and site 6 development 13,800,000 7 (Base Project Allocation - $11,000,000) 8 (Land Allocation - $1,000,000) 9 (Design and Contingencies - $1,800,000) 10 (B) Construct or acquire a new PennDOT 11 driver and motor vehicle central 12 office/service center including design, 13 site acquisition and construction 58,000,000 14 (Base Project Allocation - $50,000,000) 15 (Land Allocation - $3,000,000) 16 (Design and Contingencies - $5,000,000) 17 (C) PROVIDE FOR THE REQUIRED ELECTRICAL <-- 18 RENOVATIONS TO OBTAIN A TIER 3 LEVEL 19 DESIGNATION, INCLUDING SYSTEM 20 REDUNDANCY (I.E., SWITCHGEAR, ETC.) 21 AND/OR STAND ALONE TRANSFORMERS AT THE 22 DAUPHIN COUNTY SERVER FARM 2,000,000 23 (BASE PROJECT ALLOCATION - $1,500,000) 24 (DESIGN AND CONTINGENCIES - $500,000) 25 (D) CONSTRUCT NEW DAUPHIN COUNTY STATEWIDE 26 TRAFFIC MANAGEMENT CENTER FACILITY, 27 INCLUDING BUILDINGS, SITE ACQUISITION 28 AND DEVELOPMENT 5,000,000 29 (BASE PROJECT ALLOCATION - $4,000,000) 30 (LAND ALLOCATION - $500,000) 20070H1589B4129 - 64 -
1 (DESIGN AND CONTINGENCIES - $500,000)
2 (E) CONSTRUCT NEW STORAGE PRE-ENGINEERED
3 STEEL BUILDING, INCLUDING DEVELOPMENT
4 AT THE DAUPHIN COUNTY SIGN SHOP
5 FACILITY 1,500,000
6 (BASE PROJECT ALLOCATION - $1,250,000)
7 (DESIGN AND CONTINGENCIES - $250,000)
8 (II.1) FRANKLIN COUNTY
9 (A) CONSTRUCT OR ACQUIRE NEW FRANKLIN
10 COUNTY MAINTENANCE FACILITY, INCLUDING
11 SALT AND EQUIPMENT STORAGE BUILDINGS
12 AND SITE DEVELOPMENT 13,800,000
13 (BASE PROJECT ALLOCATION - $11,000,000)
14 (LAND ALLOCATION - $1,000,000)
15 (DESIGN AND CONTINGENCIES - $1,800,000)
16 (ii.1) (II.2) Lawrence County <--
17 (A) Renovate and expand site 16 safety
18 rest area in Lawrence County, including
19 storage, parking and development 2,000,000
20 (Base Project Allocation - $1,800,000)
21 (Design and Contingencies - $200,000)
22 (B) RENOVATE AND EXPAND SITE 15 SAFETY <--
23 REST AREA IN LAWRENCE COUNTY, INCLUDING
24 STORAGE, PARKING AND DEVELOPMENT 2,000,000
25 (BASE PROJECT ALLOCATION - $1,800,000)
26 (DESIGN AND CONTINGENCIES - $200,000)
27 (II.3) LYCOMING COUNTY
28 (A) CONSTRUCT OR ACQUIRE NEW LYCOMING
29 COUNTY MAINTENANCE FACILITY, INCLUDING
30 SALT AND EQUIPMENT STORAGE BUILDINGS
20070H1589B4129 - 65 -
1 AND SITE DEVELOPMENT 13,800,000 2 (BASE PROJECT ALLOCATION - $11,000,000) 3 (LAND ALLOCATION - $1,000,000) 4 (DESIGN AND CONTINGENCIES - $1,800,000) 5 (ii.2) (II.4) McKean County <-- 6 (A) Acquisition and infrastructure related 7 to the construction of the Route 219 8 Visitor/Discovery Center 8,200,000 9 (iii) Mifflin County 10 (A) Construct or acquire a new county 11 maintenance facility including salt and 12 equipment storage buildings and site 13 development 13,800,000 14 (Base Project Allocation - $11,000,000) 15 (Land Allocation - $1,000,000) 16 (Design and Contingencies - $1,800,000) 17 (iii.1) Philadelphia County <-- 18 (III.1) PERRY COUNTY <-- 19 (A) CONSTRUCT OR ACQUIRE NEW PERRY COUNTY 20 MAINTENANCE FACILITY, INCLUDING SALT 21 AND EQUIPMENT STORAGE BUILDINGS AND 22 SITE DEVELOPMENT 13,800,000 23 (BASE PROJECT ALLOCATION - $11,000,000) 24 (LAND ALLOCATION - $1,000,000) 25 (DESIGN AND CONTINGENCIES - $1,800,000) 26 (III.2) PHILADELPHIA COUNTY 27 (A) CONSTRUCT OR ACQUIRE NEW PHILADELPHIA 28 COUNTY MAINTENANCE FACILITY, INCLUDING 29 SALT AND EQUIPMENT STORAGE BUILDINGS 30 AND SITE DEVELOPMENT 13,800,000 20070H1589B4129 - 66 -
1 (BASE PROJECT ALLOCATION - $11,000,000)
2 (LAND ALLOCATION - $1,000,000)
3 (DESIGN AND CONTINGENCIES - $1,800,000)
4 (A) (B) Avenue of the Arts, North Broad <--
5 Streetsape improvements 20,000,000
6 (III.3) POTTER COUNTY <--
7 (A) CONSTRUCT OR ACQUIRE NEW POTTER COUNTY
8 MAINTENANCE FACILITY, INCLUDING SALT
9 AND EQUIPMENT STORAGE BUILDINGS AND
10 SITE DEVELOPMENT 13,800,000
11 (BASE PROJECT ALLOCATION - $11,000,000)
12 (LAND ALLOCATION - $1,000,000)
13 (DESIGN AND CONTINGENCIES - $1,800,000)
14 (III.4) WAYNE COUNTY
15 (A) CONSTRUCT OR ACQUIRE NEW WAYNE COUNTY
16 MAINTENANCE FACILITY, INCLUDING SALT
17 AND EQUIPMENT STORAGE BUILDINGS AND
18 SITE DEVELOPMENT 13,800,000
19 (BASE PROJECT ALLOCATION - $11,000,000)
20 (LAND ALLOCATION - $1,000,000)
21 (DESIGN AND CONTINGENCIES - $1,800,000)
22 (iv) Wyoming County
23 (A) Construct or acquire a new county
24 maintenance facility including salt and
25 equipment storage buildings and site
26 development 13,800,000
27 (Base Project Allocation - $11,000,000)
28 (Land Allocation - $1,000,000)
29 (Design and Contingencies - $1,800,000)
30 (V) YORK COUNTY <--
20070H1589B4129 - 67 -
1 (A) RENOVATE AND EXPAND EXISTING YORK 2 COUNTY WELCOME CENTER AND REST AREA, 3 INCLUDING PARKING, RESTROOMS, DISPLAY 4 AREAS, TOURISM SERVICES, PICNIC AREAS 5 AND BUILDING COMPLIANCES TO MODERN 6 CODES 5,000,000 7 (BASE PROJECT ALLOCATION - $4,500,000) 8 (DESIGN AND CONTINGENCIES - $500,000) 9 (14) Philadelphia Regional Port Authority 10 (i) Philadelphia County 11 (A) Acquisition and development of dredge 12 material disposal sites 300,000,000 13 (B) General improvements to port 14 facilities 200,000,000 15 Section 4. Itemization of furniture and equipment projects. 16 Additional capital projects in the category of public 17 improvement projects consisting of the acquisition of movable 18 furniture and equipment to complete public improvement projects 19 and to be purchased by the Department of General Services, its 20 successors or assigns and to be financed by the incurring of 21 debt are hereby itemized, together with their respective 22 estimated financial costs, as follows: 23 Total 24 Project 25 Project Allocation 26 (1) Office of Administration 27 (i) Statewide mobile radio and microwave 28 system 29 (A) Additional funds for original 30 furniture and equipment to make the 20070H1589B4129 - 68 -
1 Statewide radio and microwave system 2 DGS project 950-10 operational 21,000,000 3 (2) Department of Conservation and Natural 4 Resources 5 (i) Benjamin Rush State Park 6 (A) Original furniture and equipment for 7 current capital projects 217,000 8 (ii) Cook Forest State Park 9 (A) Original furniture and equipment for 10 current capital projects 114,000 11 (iii) Delaware Canal State Park 12 (A) Original furniture and equipment for 13 current capital projects 200,000 14 (iv) Kinzua Bridge State Park 15 (A) Original furniture and equipment for 16 current capital projects 3,000,000 17 (v) Nescopeck State Park 18 (A) Original furniture and equipment for 19 current capital projects 150,000 20 (vi) Pine Grove Furnace State Park 21 (A) Original furniture and equipment for 22 current capital projects 200,000 23 (vii) Presque Isle State Park 24 (A) Original furniture and equipment for 25 current capital projects 400,000 26 (viii) Sinnemahoning State Park 27 (A) Original furniture and equipment for 28 current capital projects 2,000,000 29 (3) Department of Corrections 30 (i) (Reserved) 20070H1589B4129 - 69 -
1 (ii) State Correctional Institution at 2 Graterford 3 (A) Original furniture and equipment for 4 the new institution at SCI Graterford 6,500,000 5 (iii) State Correctional Institution at 6 Huntingdon 7 (A) Original furniture and equipment for 8 the new institution at SCI Huntingdon 6,500,000 9 (iv) State Correctional Institution at 10 Rockview 11 (A) Original furniture and equipment for 12 the new institution 6,500,000 13 (v) New State Correctional Institution in 14 Luzerne County 15 (A) Original furniture and equipment for 16 the new institution within a five-mile 17 radius of SCI Retreat 6,500,000 18 (vi) New State Correctional Institution in 19 Fayette County 20 (A) Original furniture and equipment for 21 new institution 6,500,000 22 (vii) New State Correctional Institution in 23 Northumberland County 24 (A) Original furniture and equipment for 25 the new institution 6,500,000 26 (4) Department of Education 27 (i) Scranton School for the Deaf 28 (A) Movable furniture and equipment to 29 allow modernization of classrooms and 30 other buildings to meet current 20070H1589B4129 - 70 -
1 standards 2,625,000 2 (B) ORIGINAL FURNITURE AND EQUIPMENT FOR <-- 3 THE BROADCAST AND DEAF SERVICES 4 BUILDING EXPANSION 1,035,000 5 (ii) Lincoln University 6 (A) Movable furniture and equipment to 7 allow construction project at Wright 8 Hall to become operational 3,000,000 9 (B) Movable furniture and equipment at 10 Langston Hughes Library for use for the 11 completely renovated facility 4,000,000 12 (C) Furniture and equipment for Grim Hall 13 renovations, DGS Project No. 1101-39 2,000,000 14 (D) Furniture and equipment for Academic 15 Student Center, DGS Project No. 1101- 16 47 5,000,000 17 (E) ORIGINAL FURNITURE AND EQUIPMENT FOR <-- 18 THE JOHN MILLER DICKEY HALL 4,000,000 19 (BASE PROJECT ALLOCATION - $3,200,000) 20 (DESIGN AND CONTINGENCIES - $800,000) 21 (iii) The Pennsylvania State University 22 (A) Labs and original furnishings for the 23 chemical engineering building 8,600,000 24 (B) Altoona campus, engineering building 25 lab equipment 4,500,000 26 (C) Dubois campus, engineering building 27 lab equipment 4,500,000 28 (D) University Park, engineering building 29 lab equipment 10,000,000 30 (E) University Park, original equipment 20070H1589B4129 - 71 -
1 for a newly constructed applied 2 research lab building 10,000,000 3 (4.1) Department of General Services 4 (i) Capital East Wing Office Building 5 (A) Purchases of furniture and equipment 6 for the East Wing 4,500,000 7 (ii) Irvis Office Building 8 (A) Purchases of furniture and equipment 9 for the Irvis Office Building 5,000,000 10 (5) Pennsylvania Historical and Museum Commission 11 (i) Eckley Miners' Village 12 (A) Replacement of original furniture and 13 equipment associated with the visiting 14 public 1,920,000 15 (I.1) EPHRATA CLOISTER <-- 16 (A) ORIGINAL FURNITURE AND EQUIPMENT FOR 17 THE NEWLY RENOVATED VISITORS' CENTER, 18 INCLUDING HIGH-DENSITY STORAGE SYSTEM 600,000 19 (ii) Graeme Park 20 (A) Original furniture and equipment 21 associated with the new orientation 22 exhibit 720,000 23 (iii) Landis Valley Museum 24 (A) Construct new museum exhibits for the 25 expanded visitors' center building and 26 other buildings 1,800,000 27 (iv) State Records Center 28 (A) Original furniture and equipment 29 including a mobile high density storage 30 system 1,800,000 20070H1589B4129 - 72 -
1 (5.1) Pennsylvania Emergency Management Agency 2 (i) Dauphin County 3 (A) Original furniture and equipment for 4 new office space construction 10,000,000 5 (ii) Lebanon County 6 (A) Original furniture and equipment for 7 new office space construction 10,000,000 8 (5.2) Pennsylvania State Police 9 (i) Philadelphia 10 (A) Original furniture and equipment for 11 the expansion of Philadelphia 12 Headquarters 2,000,000 13 (6) State System of Higher Education 14 (i) Bloomsburg University of Pennsylvania 15 (A) Additional funding for original 16 furniture and equipment for Sutliff 17 Hall addition 500,000 18 (ii) East Stroudsburg University of 19 Pennsylvania 20 (A) Additional funding for original 21 furniture and equipment for Rosenkrans 22 Hall 1,000,000 23 (iii) Kutztown University of Pennsylvania 24 (A) Supplemental funding for the purchase 25 of movable furniture and equipment to 26 allow Schaffer Auditorium construction 27 project to become operational 500,000 28 (B) Furniture, fixtures and equipment for 29 the Sharadine Art Building 1,900,000 30 (iv) (Reserved) 20070H1589B4129 - 73 -
1 (v) Lock Haven University of Pennsylvania 2 (A) Costs associated with furniture and 3 equipment for a new indoor athletic 4 facility at the Lock Haven University 5 Clearfield campus 1,000,000 6 (B) Additional funding for original 7 furniture and equipment for the old 8 KCSD High School renovation project 1,500,000 9 (C) ADDITIONAL FUNDS FOR ORIGINAL <-- 10 FURNITURE AND EQUIPMENT FOR SCIENCE AND 11 MATH CENTER 1,500,000 12 (vi) Millersville University of Pennsylvania 13 (A) Supplemental funding for the purchase 14 of movable furniture and equipment to 15 allow Theatre Arts Education Building 16 construction project to become 17 operational 200,000 18 (vii) Shippensburg University of Pennsylvania 19 (A) Supplemental funding for the purchase 20 of movable furniture and equipment to 21 allow Huber Arts Center construction 22 project to become operational 500,000 23 (viii) Slippery Rock University of 24 Pennsylvania 25 (A) Supplemental funding for the purchase 26 of movable furniture and equipment to 27 allow Performing Arts Center 28 construction project to become 29 operational 1,000,000 30 Section 5. Itemization of transportation assistance projects. 20070H1589B4129 - 74 -
1 (a) Mass transit.--Additional capital projects in the
2 category of transportation assistance projects for mass transit
3 in which an interest is to be acquired or constructed by the
4 Department of Transportation, its successors or assigns and to
5 be financed by the incurring of debt are hereby itemized,
6 together with their estimated financial costs, as follows:
7 Total
8 Project
9 Project Allocation
10 (1) AREA TRANSPORTATION AUTHORITY <--
11 (I) PURCHASE SIX ACCESSIBLE LESS-THAN-30-FOOT
12 REPLACEMENT BUSES AND ONE ACCESSIBLE
13 REPLACEMENT VAN 112,000
14 (BASE PROJECT ALLOCATION - $101,000)
15 (DESIGN AND CONTINGENCIES - $11,000)
16 (II) PROVIDE FOR CONTINUATION OF THE ITS
17 PROJECT, INCLUDING THE AUTOMATIC VEHICLE
18 LOCATOR AND VIDEO SURVEILLANCE SYSTEMS 239,000
19 (BASE PROJECT ALLOCATION - $215,000)
20 (DESIGN AND CONTINGENCIES - $24,000)
21 (III) CONSTRUCT ST. MARY'S AND PUNXSUTAWNEY
22 PASSENGER TERMINALS 628,000
23 (BASE PROJECT ALLOCATION - $565,000)
24 (DESIGN AND CONTINGENCIES - $63,000)
25 (1) (1.1) Beaver County Transit Authority <--
26 (i) Provide for improvements in bus
27 circulation, passenger waiting and terminal
28 areas at the Rochester Transportation
29 Center (RTC), pedestrian improvements with
30 the Transit Revitalization Investment
20070H1589B4129 - 75 -
1 District (TRID) area and from the RTC to 2 the Rochester riverfront development and 3 signal preemption/prioritization request 4 system in the TRID area 317,000 5 (Base Project Allocation - $285,000) 6 (Design and Contingencies - $32,000) 7 (2) Berks Area Reading Transit Authority 8 (i) Purchase and install an Auto Vehicle 9 Locator System for both fixed route and 10 paratransit systems 167,000 11 (Base Project Allocation - $150,000) 12 (Design and Contingencies -$17,000) 13 (2.1) Bucks County Transportation Management 14 Association 15 (i) Costs related to Phase II of the 16 Quakertown-Stoney Creek Passenger Rail 17 Restoration Project 5,000,000 18 (3) Cambria County Transit Authority 19 (i) Replace bus wash system, upgrade 20 communication system and purchase security 21 surveillance system 100,000 22 (Base Project Allocation - $90,000) 23 (Design and Contingencies - $10,000) 24 (ii) Construct rural transfer center to 25 increase service efficiency, attract new 26 riders and provide easier transfers for 27 riders 100,000 28 (Base Project Allocation - $90,000) 29 (Design and Contingencies - $10,000) 30 (III) REPLACE SIX BUSES WHICH HAVE MET THEIR <-- 20070H1589B4129 - 76 -
1 USEFUL LIFE 342,000 2 (BASE PROJECT ALLOCATION - $308,000) 3 (DESIGN AND CONTINGENCIES - $34,000) 4 (4) Capital Area Transit 5 (i) Improve and renovate CAT's maintenance 6 building to include three bays to repair 7 and service 40-foot low floor buses 233,000 8 (Base Project Allocation - $210,000) 9 (Design and Contingencies - $23,000) 10 (5) Centre Area Transportation Authority 11 (i) Purchase 16 buses to replace buses which 12 have met their useful life 167,000 13 (Base Project Allocation - $150,000) 14 (Design and Contingencies - $17,000) 15 (ii) Purchase automatic vehicle locator system 16 with the first phase to equip buses and 17 service vehicles with such items as the 18 automatic enunciators, electronic 19 performance monitoring, stop-by-stop 20 passenger counts, real time passenger 21 information via the Internet and at major 22 stops 156,000 23 (Base Project Allocation - $140,000) 24 (Design and Contingencies - $16,000) 25 (iii) Park and ride facility 2,500,000 26 (IV) REPLACE CNG COMPRESSORS AT THE FUELING <-- 27 STATION WHICH HAVE MET THEIR USEFUL LIFE 26,000 28 (BASE PROJECT ALLOCATION - $23,000) 29 (DESIGN AND CONTINGENCIES - $3,000) 30 (V) PURCHASE 11 CNG TRANSIT BUSES TO REPLACE 20070H1589B4129 - 77 -
1 EXISTING BUSES WHICH HAVE MET THEIR USEFUL 2 LIFE 580,000 3 (BASE PROJECT ALLOCATION - $522,000) 4 (DESIGN AND CONTINGENCIES - $58,000) 5 (6) Crawford Area Transportation Authority 6 (i) Construct administrative intermodal center 7 in downtown Meadville and purchase bus 8 related equipment 333,000 9 (Base Project Allocation - $300,000) 10 (Design and Contingencies - $33,000) 11 (II) PURCHASE UP TO SIX NEW ACCESSIBLE FIXED- <-- 12 ROUTE BUSES 216,000 13 (BASE PROJECT ALLOCATION - $194,000) 14 (DESIGN AND CONTINGENCIES - $22,000) 15 (6.1) Elizabethtown Intermodal Transportation 16 Center 17 (i) Construction of a high-level platform and 18 elevators at existing Elizabethtown train 19 station 2,000,000 20 (Base Project Allocation - $2,000,000) 21 (ii) Construction of a new parking garage 22 adjacent to Intermodal Transportation 23 Center 4,000,000 24 (Base Project Allocation - $4,000,000) 25 (6.2) Elk County Area Transportation Authority 26 (i) Construction of the Depot Street 27 intermodal transportation facility and 28 parking deck in the City of St. Mary's 1,500,000 29 (7) Erie Metropolitan Transit Authority 30 (i) Acquire five buses to replace five 20070H1589B4129 - 78 -
1 existing buses which have exceeded their 2 useful life 379,000 3 (Base Project Allocation - $341,000) 4 (Design and Contingencies - $38,000) 5 (ii) Renovate administration/maintenance 6 facility and purchase shop and 7 miscellaneous equipment 39,000 8 (Base Project Allocation - $35,000) 9 (Design and Contingencies - $4,000) 10 (iii) Purchase technology upgrades to radio 11 and fare box systems and complete system 12 wide signage 33,000 13 (Base Project Allocation - $30,000) 14 (Design and Contingencies - $3,000) 15 (IV) ACQUIRE AUTOMATED VEHICLE LOCATOR SYSTEM 290,000 <-- 16 (BASE PROJECT ALLOCATION - $261,000) 17 (DESIGN AND CONTINGENCIES - $29,000) 18 (V) PROVIDE FOR BUS REPLACEMENT, FACILITY 19 REHABILITATION AND RELATED EQUIPMENT 540,000 20 (BASE PROJECT ALLOCATION - $486,000) 21 (DESIGN AND CONTINGENCIES - $54,000) 22 (VI) CONSTRUCT NEW TRANSIT FACILITY, WHICH 23 WILL BE A COMBINED ADMINISTRATION 24 MAINTENANCE BUILDING FOR THE FIXED-ROUTE 25 AND PARATRANSIT DIVISIONS 967,000 26 (BASE PROJECT ALLOCATION - $870,000) 27 (DESIGN AND CONTINGENCIES - $97,000) 28 (7.1) FAYETTE COUNTY 29 (I) REPLACE 30-FOOT BUS AND RELATED EQUIPMENT 124,000 30 (BASE PROJECT ALLOCATION - $112,000) 20070H1589B4129 - 79 -
1 (DESIGN AND CONTINGENCIES - $12,000) 2 (7.1) (7.2) Indiana County Transit Authority <-- 3 (i) Renovation and expansion of bus garage 4 project 260,000 5 (Base Project Allocation - $260,000) 6 (7.3) LEHIGH AND NORTHAMPTON TRANSPORTATION <-- 7 AUTHORITY 8 (I) PURCHASE FIVE HEAVY DUTY TRANSIT BUSES FOR 9 EXPANDED FIXED-ROUTE PUBLIC TRANSPORTATION 10 SERVICES 290,000 11 (BASE PROJECT ALLOCATION - $261,000) 12 (DESIGN AND CONTINGENCIES - $29,000) 13 (II) REPLACE 20 PARATRANSIT SERVICE SMALL 14 TRANSIT BUSES WHICH HAVE MET THEIR USEFUL 15 LIFE 240,000 16 (BASE PROJECT ALLOCATION - $216,000) 17 (DESIGN AND CONTINGENCIES - $24,000) 18 (7.2) (7.4) Port Authority of Allegheny County <-- 19 (i) FY 2009-2010 Federal Flex Funds (STP 20 and/or CMAQ) 2,000,000 21 (ii) FY 2009-2010 section 5309 fixed guideway 22 modernization 5,000,000 23 (iii) FY 2009-2010 East-West Corridor Rapid 24 Transit 5,000,000 25 (iv) FY 2009-2010 infrastructure Safety 26 Renewal Program (ISRP) 17,000,000 27 (v) FY 2009-2010 vehicle overhaul 4,000,000 28 (vi) FY 2009-2010 section 5307 Formula 29 Program 7,000,000 30 (vii) Completion of linear park in Edgewood 20070H1589B4129 - 80 -
1 Borough adjacent to East Busway facility 7,200,000 2 (viii) Construction and infrastructure-related 3 costs for the Robinson Intermodal Facility 4,000,000 4 (IX) PROVIDE FOR A SMART CARD-BASED FARE <-- 5 COLLECTION SYSTEM THAT CAN BE UTILIZED BY 6 ALL REGIONAL TRANSIT OPERATORS THAT ELECT 7 TO PARTICIPATE IN THE PROJECT UTILIZING 8 COMMON INFRASTRUCTURE FOR BETTER 9 COORDINATION OF REGIONAL SERVICES 9,472,000 10 (BASE PROJECT ALLOCATION - $8,525,000) 11 (DESIGN AND CONTINGENCIES - $947,000) 12 (7.3) (7.5) Luzerne County <-- 13 (i) Acquisition, construction, infrastructure 14 and other related costs for an intermodal 15 transportation facility in City of Wilkes- 16 Barre 4,000,000 17 (7.4) (7.6) Montgomery County <-- 18 (i) Construction and renovations for 19 Jenkintown intermodal facility to include 20 parking and transit access 2,000,000 21 (7.5) (7.7) Mount Joy AMTRAK Station <-- 22 (i) Infrastructure, construction and other 23 related costs for the renovations and 24 upgrades to facilities, including ADA- 25 related improvements and the construction 26 of a platform for freight and passenger 27 use 1,900,000 28 (7.8) POTTSTOWN URBAN TRANSIT <-- 29 (I) REPLACE EXISTING BUSES WHICH HAVE MET 30 THEIR USEFUL LIFE 657,000 20070H1589B4129 - 81 -
1 (BASE PROJECT ALLOCATION - $591,000) 2 (DESIGN AND CONTINGENCIES - $66,000) 3 (8) Red Rose Transit Authority 4 (i) Replace bus washer and renovation and 5 expand bus storage building 375,000 6 (Base Project Allocation - $337,000) 7 (Design and Contingencies - $38,000) 8 (ii) Design and construct new station on 9 AMTRAK Harrisburg to Philadelphia line in 10 Paradise Township, Lancaster County 200,000 11 (Base Project Allocation - $180,000) 12 (Design and Contingencies - $20,000) 13 (III) RENOVATE AND EXPAND OPERATIONS CENTER <-- 14 BUS STORAGE BUILDING, MAINTENANCE GARAGE 15 AND ADMINISTRATION OFFICE 967,000 16 (BASE PROJECT ALLOCATION - $870,000) 17 (DESIGN AND CONTINGENCIES - $97,000) 18 (IV) PROVIDE FOR FARE COLLECTION AND SUPPORT 19 EQUIPMENT (BUS WASHER) PURCHASE AND 20 REPLACEMENT PROGRAM 242,000 21 (BASE PROJECT ALLOCATION - $218,000) 22 (DESIGN AND CONTINGENCIES - $24,000) 23 (9) Shenango Valley Shuttle Service 24 (i) Construct a maintenance facility including 25 equipment and land acquisition 250,000 26 (Base Project Allocation - $225,000) 27 (Design and Contingencies - $25,000) 28 (10) Southeastern Pennsylvania Transportation 29 Authority 30 (i) Provide for the rehabilitation of 20070H1589B4129 - 82 -
1 improvements at Croyden and Levittown 2 Stations located in Bucks County with 3 improvements to include the installation of 4 bus shelters and transit signage, station 5 improvements, bus access improvements at 6 both stations and parking expansion 3,500,000 7 (Base Project Allocation - $3,150,000) 8 (Design and Contingencies - $350,000) 9 (ii) Provide for the rehabilitation of 10 improvements to bus and rail intermodal 11 connections at the Glenside and Jenkintown 12 Stations in Montgomery County with 13 improvements to include design and 14 construction of a multilevel 384 space 15 parking garage at Glenside Station and a 16 multilevel 700 space parking garage at 17 Jenkintown Station 6,700,000 18 (Base Project Allocation - $6,030,000) 19 (Design and Contingencies - $670,000) 20 (iii) FFY 2008 Transit Enhancement Program, 21 provide for renovation and preservation of 22 historic train stations and related 23 activities including bus shelters, 24 landscaping, street lights, pedestrian 25 access and walkways, bicycle access, 26 signage and enhanced access to transit for 27 persons with disabilities 670,000 28 (Base Project Allocation - $603,000) 29 (Design and Contingencies - $67,000) 30 (iv) Provide for construction of a multilevel 20070H1589B4129 - 83 -
1 parking structure and pedestrian overpass 2 over AMTRAK tracks, to connect the west 3 side of the campus of Villanova to the main 4 campus, with parking for approximately 5 1,000 vehicles and be handicapped 6 accessible 625,000 7 (Base Project Allocation - $562,000) 8 (Design and Contingencies - $63,000) 9 (v) FFY 2002 Section 5309 Transit Enhancement 10 Program, provide additional funding for the 11 acquisition of 104 new rail cars for SEPTA 12 Regional Rail service 2,000,000 13 (Base Project Allocation - $1,800,000) 14 (Design and Contingencies - $200,000) 15 (VI) FFY 2008 TRANSIT ENHANCEMENT PROGRAM, <-- 16 PROVIDE ADDITIONAL FUNDS FOR THE 17 REHABILITATION OF THE MARKET STREET 18 ELEVATED RECONSTRUCTION PROGRAM, INCLUDING 19 THE COMPLETE RECONSTRUCTION OF 20 SUPERSTRUCTURE FOUNDATIONS, ABUTMENTS AND 21 BEARINGS 2,320,000 22 (BASE PROJECT ALLOCATION - $2,088,000) 23 (DESIGN AND CONTINGENCIES - $232,000) 24 (VII) FFY 2008 TRANSIT ENHANCEMENT PROGRAM, 25 PROVIDE ADDITIONAL FUNDS FOR THE 26 REHABILITATION OF THE MARKET STREET 27 ELEVATED RECONSTRUCTION PROGRAM AND THE 28 PAOLI TRANSPORTATION CENTER, INCLUDING THE 29 COMPLETE RECONSTRUCTION OF SUPERSTRUCTURE, 30 FOUNDATIONS, ABUTMENTS AND BEARINGS 22,616,000 20070H1589B4129 - 84 -
1 (BASE PROJECT ALLOCATION - $20,354,000) 2 (DESIGN AND CONTINGENCIES - $2,262,000) 3 (VIII) FFY 2009 TRANSIT ENHANCEMENT PROGRAM, 4 PROVIDE FOR THE BUS PURCHASE PROGRAM, FARE 5 COLLECTION SYSTEM UPGRADE, MARKET STREET 6 ELEVATED RECONSTRUCTION, SMART STATIONS, 7 STATE OF GOOD REPAIR PROGRAM, STATION 8 ACCESSIBILITY, SYSTEMS IMPROVEMENT PROGRAM 9 AND UTILITY FLEET RENEWAL 15,077,000 10 (BASE PROJECT ALLOCATION - $13,569,000) 11 (DESIGN AND CONTINGENCIES - $1,508,000) 12 (IX) UPGRADE SILVERLINER PROPULSION SYSTEM AND 13 IMPROVE THE SILVERLINER IV FLEET, INCLUDING 14 DOOR CONTROL RELAY PANEL, BLENDING VALVE 15 AND HVAC CONTROL UPGRADE 684,000 16 (BASE PROJECT ALLOCATION - $616,000) 17 (DESIGN AND CONTINGENCIES - $68,000) 18 (X) FFY 2009 FEDERAL HIGHWAY FLEX PROJECTS, 19 PROVIDE FOR THE EXTON STATION PARKING 20 EXPANSION, UPGRADING OF WARNING DEVICES AT 21 VARIOUS RAILROAD/HIGH GRADE CROSSINGS AND 22 THE CONSTRUCTION OF THE VILLANOVA 23 INTERMODAL TRANSPORTATION CENTER 967,000 24 (BASE PROJECT ALLOCATION - $870,000) 25 (DESIGN AND CONTINGENCIES - $97,000) 26 (XI) FFY 2009 TRANSIT BUS PURCHASE PROGRAM, 27 ACQUIRE 400 ACCESSIBLE 40-FOOT LOW FLOOR 28 BUSES, INCLUDING A PRICING OPTION FOR 29 DIESEL-ELECTRIC HYBRID BUSES REPLACING 30 THOSE WHICH HAVE MET THEIR USEFUL LIFE 4,175,000 20070H1589B4129 - 85 -
1 (BASE PROJECT ALLOCATION - $3,757,000) 2 (DESIGN AND CONTINGENCIES - $418,000) 3 (XII) VEHICLE OVERHAUL PROGRAM, PROVIDE FOR 4 SEPTA'S FISCAL YEAR 2008-2009 VEHICLE 5 OVERHAUL PROGRAM, WHICH PROVIDES FOR THE 6 MAJOR OVERHAUL OF SEPTA'S ROLLING STOCK 45,435,000 7 (BASE PROJECT ALLOCATION - $40,891,000) 8 (DESIGN AND CONTINGENCIES - $4,544,000) 9 (XIII) INFRASTRUCTURE SAFETY RENEWAL PROGRAM, 10 PROVIDE FOR SEPTA'S FISCAL YEAR 2008-2009 11 INFRASTRUCTURE SAFETY RENEWAL PROGRAM, 12 WHICH INCLUDES IMPROVEMENTS TO STATIONS, 13 SIGNALS, TRACK, POWER AND BUILDINGS 31,901,000 14 (BASE PROJECT ALLOCATION - $28,711,000) 15 (DESIGN AND CONTINGENCIES - $3,190,000) 16 (11) Union and Snyder Transit Authority 17 (i) Construct maintenance facility including 18 equipment and land acquisition 304,000 19 (Base Project Allocation - $273,000) 20 (Design and Contingencies - $31,000) 21 (II) ADDITIONAL FUNDS TO CONSTRUCT A VEHICLE <-- 22 STORAGE AND MAINTENANCE FACILITY AND 23 PURCHASE SHOP EQUIPMENT 191,000 24 (BASE PROJECT ALLOCATION - $172,000) 25 (DESIGN AND CONTINGENCIES - $19,000) 26 (12) Department of Transportation 27 (i) Provide for rail passenger improvements 28 across this Commonwealth including matching 29 funds for the Keystone Corridor Federal 30 funding 15,000,000 20070H1589B4129 - 86 -
1 (Base Project Allocation - $13,500,000) 2 (Design and Contingencies - $1,500,000) 3 (ii) Provide for Intercity Bus Capital 4 Assistance Intermodal Projects and ADA 5 related facilities/equipment improvements 2,000,000 6 (Base Project Allocation - $1,800,000) 7 (Design and Contingencies - $200,000) 8 (b) Rural and intercity rail.--Additional capital projects 9 in the category of transportation assistance projects for rural 10 and intercity rail service projects to be constructed or with 11 respect to which an interest is to be acquired by the Department 12 of Transportation, its successors or assigns and to be financed 13 by the incurring of debt are hereby itemized, together with 14 their respective estimated financial costs, as follows: 15 Total 16 Project 17 Project Allocation 18 (1) Allegheny County 19 (i) US Steel Mon Valley Transportation 20 Assistance project, including 21 rehabilitation and replacement of rail 22 infrastructure to maintain capacity and 23 operating capability, reconstruction of 24 culverts and ditches on property and 25 enhancement of tracks to accommodate 26 heavier cars 10,000,000 27 (II) DEVELOPMENT AND UTILIZATION OF HIGH- <-- 28 PERFORMANCE PRECISION MANUFACTURING 29 TECHNOLOGY FOR DEPLOYMENT OF THE 30 PENNSYLVANIA HIGH-SPEED MAGLEV SYSTEM 20070H1589B4129 - 87 -
1 ACROSS PENNSYLVANIA, WITH STOPS INCLUDING, 2 BUT NOT LIMITED TO, GREATER PITTSBURGH 3 INTERNATIONAL AIRPORT, PITTSBURGH, 4 MONROEVILLE, WESTMORELAND COUNTY, 5 JOHNSTOWN, ALTOONA, STATE COLLEGE, 6 LEWISTOWN, HARRISBURG, LANCASTER, DELAWARE 7 COUNTY AND PHILADELPHIA, AND FOR USE IN 8 BRIDGE AND ELEVATED HIGHWAY STRUCTURES, 9 INCLUDING STRUCTURAL BEAMS SUCH AS I-BEAMS 10 AND TUB GIRDERS AND OTHER METAL-FABRICATED 11 INFRASTRUCTURE COMPONENTS FOR 12 TRANSPORTATION SYSTEMS 45,000,000 13 (1.1) Armstrong County 14 (i) Reconstruction of an eight-mile spur of 15 railroad in Bethel Township 5,000,000 16 (1.2) Allegheny Valley Railroad 17 (i) P&W Subdivision Phase II railroad 18 infrastructure rehabilitation and capacity 19 improvements, including track, roadbed, 20 bridges and grade crossings from MP 322 to 21 MP 326 and from MP 1 to MP 31 in Allegheny 22 and Butler Counties 2,860,000 23 (Base Project Allocation - $2,600,000) 24 (Design and Contingencies - $260,000) 25 (ii) W&P Subdivision Phase II railroad 26 infrastructure rehabilitation and capacity 27 improvements, including track, roadbed, 28 bridges and grade crossings from MP 4 to MP 29 39 in Allegheny and Washington Counties 2,530,000 30 (Base Project Allocation - $2,300,000) 20070H1589B4129 - 88 -
1 (Design and Contingencies - $230,000) 2 (iii) Glenwood Yard new and rebuilt yard 3 tracks, capacity improvements, safety 4 improvements and rail infrastructure 5 rehabilitation, including track, roadbed, 6 bridges and grade crossings in Allegheny 7 County 4,840,000 8 (Base Project Allocation - $4,400,000) 9 (Design and Contingencies - $440,000) 10 (iv) Construction, infrastructure and other 11 related costs for rehabilitation and 12 replacement of rail infrastructure for the 13 U.S. Steel Mon Valley Works facilities 10,000,000 14 (1.3) Beaver County 15 (i) Construction, infrastructure and other 16 related costs for Aliquippa Ethanol, LLC, 17 facility 6,000,000 18 (2) Buffalo and Pittsburgh Railroad 19 (i) Rehabilitate mainline track in Armstrong, 20 Clearfield, Indiana and Jefferson Counties, 21 from Kittanning to Dubois and Punxsutawney 22 to Homer City with work to include tie and 23 rail replacement, surfacing, bridge repair, 24 switch, road crossing, signal, 25 communication and any other related work 5,000,000 26 (2.1) Altoona Blair County Development 27 Corporation 28 (i) Rehabilitation of the Bedford Secondary 29 Line in Blair County from Hollidaysburg to 30 the Walter Business Park, including 20070H1589B4129 - 89 -
1 engineering design, construction and 2 improvement upgrades 2,000,000 3 (2.2) Bucks County Transportation Management 4 Association 5 (i) Rehabilitation and improvements along the 6 Bethlehem Branch from Lansdale to 7 Bucks/Lehigh County border, including 8 property acquisition, engineering and 9 infrastructure stabilization 12,000,000 10 (3) Cambria, Clearfield and Indiana Counties 11 (i) Construction, infrastructure and other 12 related costs for the Clearfield Cluster 3,000,000 13 (3.1) Centre County 14 (i) Construction and other costs related to 15 the SEDA Welded Rail Project Phase IV - 16 Sayers Dam in Liberty Howard Boggs 17 Township 800,000 18 (3.2) Clinton County 19 (i) Improvement to railcar facility at Renovo 20 Industrial Park to enhance production, 21 including utility improvements, rail 22 improvements and building renovation and 23 improvements 3,000,000 24 (3.3) Delaware and Hudson Railway Company 25 (i) Reconstruct rail infrastructure in 26 Susquehanna County to provide service to 27 rail and truck transfer facility and 28 distribution center 3,575,000 29 (Base Project Allocation - $3,250,000) 30 (Design and Contingencies - $325,000) 20070H1589B4129 - 90 -
1 (ii) Maintain and construct rail sidings to 2 facilitate increasing freight volumes and 3 improve system capacity from Port of 4 Philadelphia to New York State 8,800,000 5 (Base Project Allocation - $8,000,000) 6 (Design and Contingencies - $800,000) 7 (iii) Rehabilitate Honey Pot Yard rail 8 infrastructure in Luzerne County to serve 9 customers within industrial park 3,300,000 10 (Base Project Allocation - $3,000,000) 11 (Design and Contingencies - $300,000) 12 (iv) Upgrade and install signal and 13 communications systems on Delaware and 14 Hudson Railway 5,225,000 15 (Base Project Allocation - $4,750,000) 16 (Design and Contingencies - $475,000) 17 (v) Development of a bulk terminal/transload 18 facility in Susquehanna County, including 19 land acquisition, site preparation, 20 grading, rail, ties, ballast, signals, 21 customer sidings, crossings and other 22 related materials 5,000,000 23 (3.4) Erie County 24 (i) Infrastructure, construction and other 25 related costs for rail expansion at the 26 former International Paper site consisting 27 of construction of two rail bridges and new 28 rail construction 5,000,000 29 (ii) Construction and rail expansion at 30 Mountfort Terminal 750,000 20070H1589B4129 - 91 -
1 (3.5) Kiski Junction Railroad 2 (i) Construction of nine-mile extension north 3 along Eastern shore of Allegheny River from 4 Schenley to Crooked Creek on former Conrail 5 railbed 5,400,000 6 (3.6) Lackawanna County 7 (i) Pennsylvania Northeast Regional Railroad 8 Authority 9 (A) Purchase and installation of materials 10 necessary for the trackage and spurs to 11 provide rail access and infrastructure 12 to the new ethanol production facility 13 in Mayfield and Carbondale 2,200,000 14 (B) Purchase and install materials 15 necessary for the upgrading, rebuilding 16 and rehabilitation of the 18-mile 17 Carbondale mainline between Moosic and 18 Carbondale 1,825,000 19 (3.7) Tri State Biofuels 20 (i) Upgrade and expand rail access to 21 alternative energy development site near 22 Uniontown for Tri State Biofuels site, 23 including new rail spur, switches and other 24 rail infrastructure materials 1,650,000 25 (Base Project Allocation - $1,500,000) 26 (Design and Contingencies - $150,000) 27 (4) Lawrence County 28 (i) Acquisition, construction, infrastructure 29 and other related costs for reconstruction 30 of rail lines in Ellwood Borough 10,000,000 20070H1589B4129 - 92 -
1 (5) Lehigh Valley Rail Management 2 (i) Construct access and storage tanks and 3 rehabilitate track within and around the 4 Bethlehem Commerce Center 3,500,000 5 (6) Luzerne County 6 (i) Acquisition, construction, infrastructure 7 and other related costs for Whitney Point 8 rail infrastructure project in Luzerne 9 Township 5,000,000 10 (ii) Center Pointe West rail project 400,000 11 (6.1) Lycoming County 12 (i) Construction of rail spurs and related 13 track work to provide rail service to 14 industrial sites for the expansion of the 15 Muncy Industrial Park in Muncy and Muncy 16 Creek Townships, Industrial Properties 17 Corporation 3,000,000 18 (6.2) Mercer County 19 (i) Update rail line and create a rail siding 20 at the Meadville Line of Norfolk and 21 Southern Railway in Sharpsville 1,000,000 22 (6.3) Monroe County 23 (i) Pennsylvania Northeast Regional Railroad 24 Authority 25 (A) Acquisition and rehabilitation of 26 10.6-mile rail track line running from 27 Analomink to the Delaware Water Gap 28 from Norfolk Southern 1,500,000 29 (6.4) Montgomery County 30 (i) Rehabilitation of Stoney Creek Branch from 20070H1589B4129 - 93 -
1 Norristown to Lansdale, including a new 2 side track to Lansdale Warehouse and 3 increased capacity at Lansdale Yard 12,000,000 4 (ii) Infrastructure improvements, 5 rehabilitation and other costs related to 6 the construction of a 250-foot rail spur 7 extension and rail side silo, rebuilding of 8 a rail car unloading system and other 9 renovations at the Custom Processing 10 Services facilities 800,000 11 (6.5) Northampton County 12 (i) Construction, infrastructure and other 13 related costs for the Forks Business Center 14 rail projects 1,000,000 15 (6.6) Northumberland County 16 (i) Infrastructure and other related costs to 17 extend rail service to the SEEDCO 18 Industrial Park in Coal Township 3,500,000 19 (ii) Upgrade of rail line, including 20 infrastructure and other related 21 improvements for the provision of rail 22 service for the SunPoint renewable energy 23 project 2,000,000 24 (7) Philadelphia County 25 (i) Rehabilitation of rail lines and 26 infrastructure improvements 10,000,000 27 (7.1) Pittsburgh and Ohio Central Railroad 28 (i) Infrastructure improvements in Allegheny 29 County 5,225,000 30 (ii) Infrastructure improvements in Allegheny 20070H1589B4129 - 94 -
1 and Washington Counties 4,400,000 2 (iii) Construction projects in Allegheny, 3 Beaver and Washington Counties 10,100,000 4 (iv) Construction projects in Beaver, 5 Washington and Allegheny Counties 11,550,000 6 (7.2) Reading Blue Mountain and Northern Railroad 7 (i) Track rehabilitation on Mainline and 8 Branchlines to support increased car 9 weights and increased business in District 10 4 in Luzerne, Lackawanna, Carbon and 11 Wyoming Counties 4,500,000 12 (ii) Rehabilitation of C&H Branch from Delano 13 Junction to Jeddo Coal facility in Hazleton 14 for new intermodal, dredge, coal and other 15 business in Luzerne County 3,200,000 16 (iii) Rehabilitation of track in Crestwood 17 Industrial Park, including extending and 18 building tracks in Penobscot Yard in 19 Luzerne County 2,400,000 20 (iv) Construction of new runaround, siding and 21 associated switches for a new interchange 22 location in Nesquehoning in Carbon County 1,700,000 23 (v) Purchase of new open top and covered 24 hopper cars 12,000,000 25 (vi) Rehabilitation of railroad bridges, 26 culverts and other infrastructure between 27 White Haven and Scranton in Luzerne County 1,000,000 28 (vii) Construction of runaround and extension 29 of track in the Scranton area 2,000,000 30 (VIII) CONSTRUCTION, INFRASTRUCTURE AND OTHER <-- 20070H1589B4129 - 95 -
1 RELATED COSTS FOR THE NESQUEHONING BRIDGE 2 PROJECT 10,000,000 3 (7.3) Rosebud Mining Railroad Expansion 4 (i) Extension of Rosebud Mining Railroad line 5 in Bethel Township 5,000,000 6 (Base Project Allocation - $5,000,000) 7 (7.4) SEDA-COG Joint Rail Authority 8 (i) Upgrade 11 miles of the main line from Mt. 9 Eagle to Eagleville, Centre County, with 10 continuous welded rail and other track 11 improvements 3,300,000 12 (ii) Construction of a 5,500-foot runaround 13 track along the main line near Milesburg, 14 Centre County 1,300,000 15 (iii) Construct rail spur and related track 16 work to provide rail service to the SEEDCO 17 Industrial Park in Mt. Carmel Township, 18 Northumberland County 2,800,000 19 (7.5) Snyder County 20 (i) Rail improvements to the Sunbury 21 Generation Station, including track, 22 construction of new rail stackout 23 facilities and rail dumper upgrades, 24 including enclosing the facility 6,994,000 25 (7.6) Stourbridge Railroad Company 26 (i) Infrastructure, construction and 27 rehabilitation of 23 miles of railroad 28 line, including track, ties, rail, ballast 29 and switches between Honesdale, Wayne 30 County, and Lackawaxen, Pike County, 20070H1589B4129 - 96 -
1 including the construction of a connecting 2 railroad spur and auxiliary railroad 3 infrastructure into an industrial complex 4 in Wayne County 9,000,000 5 (7.7) Washington County 6 (i) Penn Ridge Coal Company, LLC, construct 7 new siding and loading facility for new 8 coal mine complex near Avella, including 9 surface preparations, rails, ties and other 10 related rail infrastructure 5,500,000 11 (Base Project Allocation - $5,000,000) 12 (Design and Contingencies - $500,000) 13 (7.8) Western New York and Pennsylvania Railroad, 14 LLC 15 (i) Upgrade signals on the Buffalo Main Line 16 from State line to Driftwood in McKean and 17 Cameron Counties, including planning, 18 engineering and contingencies 200,000 19 (ii) Rehabilitation of the Buffalo Main Line 20 from State line to Driftwood in McKean and 21 Cameron Counties, including the replacement 22 of crossties and track surfacing 500,000 23 (iii) Rehabilitation of the Oil City Branch 24 from Meadville to Rouseville in Crawford, 25 Mercer and Venango Counties, including the 26 replacement of crossties, track surfacing, 27 planning and contingencies 1,667,000 28 (iv) Rehabilitation of the Meadville-Hornell 29 Main Line from Meadville to State line in 30 Crawford, Erie and Warren Counties, 20070H1589B4129 - 97 -
1 including cropping and welding of rail, 2 ties and surfacing 6,667,000 3 (v) Rehabilitation of the Farmers Valley 4 Branch from Eldred to Farmers Valley in 5 McKean County, including the replacement of 6 crossties, track surfacing, planning and 7 contingencies 333,000 8 (8) Westmoreland County 9 (i) Construction and other related costs for 10 the Norfolk Southern Commuter Rail Project 30,000,000 11 (ii) Development of the Alle-Kiski Commuter 12 Rail Project 3,000,000 13 (III) DESIGN AND CONSTRUCTION OF RAIL, <-- 14 TURNOUTS, CROSSINGS AND BRIDGE WORK WITHIN 15 THE COMMONWEALTH RENEWABLE ENERGY PLANT 16 FACILITY IN MOUNT PLEASANT 4,500,000 17 (9) Westmoreland County Industrial Development 18 Corporation 19 (i) Mount Pleasant Subdivision rail 20 infrastructure rehabilitation and capacity 21 improvements, including track, roadbed, 22 bridges and grade crossings from MP 0 to MP 23 15 in Westmoreland and Fayette Counties 2,860,000 24 (Base Project Allocation - $2,600,000) 25 (Design and Contingencies - $260,000) 26 (ii) Radebaugh Subdivision rail infrastructure 27 rehabilitation and capacity improvements, 28 including track, roadbed, bridges and grade 29 crossings from MP 0 to MP 18 in 30 Westmoreland County 2,640,000 20070H1589B4129 - 98 -
1 (Base Project Allocation - $2,400,000) 2 (Design and Contingencies - $240,000) 3 (iii) Development of new yard track structure 4 and rail infrastructure rehabilitation and 5 capacity improvements, including track, 6 roadbed, bridges and grade crossings within 7 Westmoreland Rail Freight Terminal in 8 Westmoreland County 1,540,000 9 (Base Project Allocation - $1,400,000) 10 (Design and Contingencies - $140,000) 11 (10) Wheeling and Lake Erie Railway 12 (i) Rehabilitate segments of the main line, 13 including rails, ties, ballast, grading, 14 switches, crossings and bridges in 15 Allegheny and Washington Counties 10,100,000 16 (ii) Rehabilitate ties, ballast, rails, 17 crossings, bridges and switches in Fayette 18 and Westmoreland Counties 10,100,000 19 (iii) Construct and rehabilitate new and 20 existing customer sidings in Allegheny, 21 Washington, Fayette and Westmoreland 22 Counties, including switches, signals, 23 rails, ties, ballast and other related 24 materials 7,700,000 25 (iv) Upgrade bridges and tunnels in 26 Westmoreland, Fayette, Washington and 27 Allegheny Counties 22,000,000 28 (c) Air transportation.--Additional capital projects in the 29 category of transportation assistance projects for air 30 transportation service to which an interest is to be acquired by 20070H1589B4129 - 99 -
1 the Department of Transportation, its successors or assigns and 2 to be financed by the incurring of debt are hereby itemized, 3 together with their respective estimated financial costs, as 4 follows: 5 Total 6 Project 7 Project Allocation 8 (1) Allegheny County 9 (i) Allegheny County Airport Authority 10 (A) Upgrade to Allegheny County Airport 11 Terminal and surrounding runways in 12 West Mifflin Borough 5,000,000 13 (B) Site and infrastructure improvements 1,000,000 14 (1.1) Bucks County 15 (i) Quakertown Airport 16 (A) Design, site work, infrastructure and 17 construction of a new fuel system 400,000 18 (1.2) Clearfield County 19 (i) Clearfield-Lawrence Township Airport 20 (A) Construction, infrastructure and other 21 related costs for airport improvements 1,500,000 22 (1.3) Clinton County 23 (i) William T Piper Memorial Airport 24 (A) Construction, redevelopment and other 25 costs related to hangar renovations and 26 other airport improvements 500,000 27 (1.4) DAUPHIN COUNTY <-- 28 (I) HARRISBURG INTERNATIONAL AIRPORT 29 (A) PROVIDE AIRPORT IMPROVEMENTS FOR THE 30 ECONOMIC DEVELOPMENT AND SAFETY 20070H1589B4129 - 100 -
1 ENHANCEMENT AT THE AIRPORT 5,000,000 2 (BASE PROJECT ALLOCATION - $4,000,000) 3 (DESIGN AND CONTINGENCIES - $1,000,000) 4 (2) Erie County 5 (i) Erie International Airport 6 (A) Acquisition, construction, 7 infrastructure, redevelopment and other 8 related costs for the Erie 9 International Airport runway extension 10,000,000 10 (2.1) Indiana County 11 (i) Jimmy Stewart Airport 12 (A) Acquisition, related infrastructure 13 and construction of an access road and 14 hangars at the Jimmy Stewart Airport 2,000,000 15 (Base Project Allocation - $2,000,000) 16 (2.2) Lancaster County 17 (i) Lancaster Airport Authority 18 (A) Site development and construction of 19 T-hangar and offices 1,000,000 20 (B) Site development and construction of 21 corporate hangar and offices 2,000,000 22 (C) Design, site work and construction to 23 rehabilitate T/W's Foxtrot and Mike 2,000,000 24 (3) Lehigh County 25 (i) Lehigh Valley International Airport 26 (A) Provide for the economic development 27 and safety enhancement at the airport 5,000,000 28 (Base Project Allocation - $4,500,000) 29 (Design and Contingencies - $500,000) 30 (4) Luzerne County 20070H1589B4129 - 101 -
1 (i) Hazle Township 2 (A) Acquisition, construction, 3 infrastructure and other related costs 4 for the development of a cargo airport 250,000,000 5 (4.1) Lycoming County 6 (i) Williamsport Regional Airport 7 (A) Construction of a fuel farm and runway 8 apron 500,000 9 (4.2) Monroe County 10 (i) Pocono Mountains Municipal Airport 11 (A) Runway expansion at the Pocono 12 Mountains Municipal Airport 1,000,000 13 (Base Project Allocation - $1,000,000) 14 (4.3) Montgomery County 15 (i) Pottstown Municipal Airport 16 (A) Engineering, planning, construction 17 and other related costs for the 18 construction of 40 new hangar slots 2,500,000 19 (4.4) Venango County 20 (i) Venango Regional Airport 21 (A) Infrastructure and construction of a 22 corporate hangar facility 300,000 23 (5) Washington County 24 (i) North Franklin Township 25 (A) Aerial right-of-way for ILS 26 Glidescope 500,000 27 (ii) South Franklin Township 28 (A) Construction, infrastructure and other 29 related costs for the Washington County 30 Airport infrastructure project 1,000,000 20070H1589B4129 - 102 -
1 (B) Acquisition, construction, 2 infrastructure and other related costs 3 for the Washington County Airport 4 expansion 2,000,000 5 Section 6. Itemization of redevelopment assistance capital 6 projects. 7 (1) Adams County 8 (i) County projects 9 (A) Renovations of the Columbia Gas 10 building to accommodate a homeless 11 shelter in Gettysburg, South Central 12 Community Action programs 300,000 13 (B) Land acquisition, infrastructure and 14 construction of a new emergency 15 services building for the Southeastern 16 Adams Volunteer Emergency Services 17 (SAVES) 1,000,000 18 (ii) Adams County Economic Development 19 Corporation 20 (A) Acquisition, infrastructure and other 21 related costs, including a target site 22 assessment for a new business park 23 along the U.S. Route 15 corridor 10,000,000 24 (iii) Adams County Historical Society 25 (A) Renovations, rehabilitation and other 26 related costs for repairs and upgrades, 27 including ADA restrooms and elevator to 28 the historical Schmucker Hall of the 29 Lutheran Theological Seminary at 30 Gettysburg 4,000,000 20070H1589B4129 - 103 -
1 (iv) Carroll Valley Borough 2 (A) Planning, design and construction of a 3 new Carroll Valley Borough Building 800,000 4 (2) Allegheny County 5 (i) County projects 6 (A) Acquisition, construction and other 7 related costs for the Millvale Marina 8 to Sharpsburg recreation project 1,000,000 9 (B) Site preparation, infrastructure and 10 construction related to a lifestyle 11 center/mixed-use development located at 12 the Kirwan Heights Interchange of 13 Interstate 79 10,000,000 14 (C) Infrastructure improvements, 15 construction and other costs related to 16 the Allegheny Together Business 17 District Revitalization project 10,000,000 18 (D) Construction, infrastructure 19 improvements and other costs related to 20 the Carrie Furnace stabilization and 21 site development project in Swissvale 22 and Rankin 15,000,000 23 (E) Infrastructure, construction and other 24 related costs to form a Regional Center 25 for Excellence in Science and Energy, 26 including the purchase of electrical 27 and mechanical systems within the 28 Pittsburgh Supercomputing Center 1,000,000 29 (F) Infrastructure, site development, 30 construction and other related costs in 20070H1589B4129 - 104 -
1 support of sports-related facilities 2 serving the Baldwin-Whitehall School 3 District 1,000,000 4 (G) Conversion of existing tennis and 5 swimming facility to multiuse 6 activities center 1,000,000 7 (H) CONSTRUCTION, REDEVELOPMENT AND OTHER <-- 8 RELATED COSTS FOR THE EAST END 9 COOPERATIVE COMMUNITY HOUSE 5,000,000 10 (I) CONSTRUCTION, INFRASTRUCTURE 11 IMPROVEMENTS AND OTHER COSTS RELATED TO 12 THE KANE REDEVELOPMENT PROJECT FOR 13 SENIOR DEVELOPMENTS IN THE NORTH HILLS 14 AND THE MON VALLEY 3,000,000 15 (ii) City of Pittsburgh 16 (A) Acquisition, construction, 17 infrastructure and other related costs 18 for the Morningside Community Center 725,000 19 (B) Construction and other related costs 20 for Pittsburgh Life Sciences expansion 1,000,000 21 (C) Construction, acquisition, 22 infrastructure, redevelopment and other 23 costs related to the revitalization at 24 Perry South 1,500,000 25 (D) Construction, infrastructure, 26 redevelopment and other costs related 27 to Allegheny General Hospital 28 renovations 15,000,000 29 (E) Construction, acquisition, 30 redevelopment and other costs related 20070H1589B4129 - 105 -
1 to the Center Avenue and Thelma Lovette 2 Family YMCA projects 3,500,000 3 (F) Construction and other related costs 4 for the renovation of the Marian Manor 5 senior health facility 550,000 6 (G) Construction, acquisition, 7 infrastructure, redevelopment, 8 abatement of hazardous materials and 9 other costs related to the Strip 10 District project 6,000,000 11 (H) Construction, infrastructure, 12 redevelopment and other costs 13 associated with the Beechview 14 redevelopment project 3,000,000 15 (I) Construction, infrastructure and other 16 related costs for Strip District 17 improvements 2,000,000 18 (J) Construction, infrastructure and other 19 related costs for Strip District 20 infrastructure improvements 6,000,000 21 (K) Construction and other related costs 22 to renovate Family House University 23 Club 1,500,000 24 (L) Construction, redevelopment and other 25 costs associated with renovation and 26 expansion of the Robert Morris 27 University downtown campus 5,000,000 28 (M) Acquisition, construction and other 29 related costs for UPMC St. Margaret 30 expansion 15,600,000 20070H1589B4129 - 106 -
1 (N) Construction, infrastructure and other 2 related costs to restore and expand 3 Deans Athletic Field community park 588,000 4 (O) Construction, acquisition, 5 infrastructure, redevelopment, 6 abatement of hazardous materials and 7 other costs related to the development 8 of Lawrenceville 10,000,000 9 (P) Construction and other related costs 10 for Riverview Towers renovations 1,800,000 11 (Q) Construction, infrastructure and 12 related costs for the Grandview Scenic 13 Byway project 1,000,000 14 (R) Construction and other related costs 15 for the Brookline Boulevard project 3,900,000 16 (S) Construction and other related costs 17 for the Homewood Brushton Community 18 Development Corporation Sterret-Collier 19 corridor revitalization 5,000,000 20 (T) Construction and other related costs 21 for Route 51 corridor redevelopment and 22 improvement 5,000,000 23 (U) Construction, infrastructure and other 24 related costs for the National Aviary 25 expansion 5,000,000 26 (V) Construction, infrastructure and other 27 related costs for the Urban League of 28 Greater Pittsburgh Charter School 1,500,000 29 (W) Construction and other related costs 30 for the revitalization of Broadway 20070H1589B4129 - 107 -
1 Avenue 7,000,000 2 (X) Acquisition, construction, 3 infrastructure and other related costs 4 for the Pittsburgh Zoo and PPG 5 Aquarium 5,000,000 6 (Y) Acquisition, construction, 7 infrastructure and other related costs 8 for the University of Pittsburgh 9 Medical Center/University of Pittsburgh 10 Diabetes Institute 20,000,000 11 (Z) Construction of science center, 12 Community College of Allegheny County 14,500,000 13 (AA) Infrastructure improvements, 14 renovations and construction for WQED 2,000,000 15 (BB) Acquisition, renovations and 16 construction of a new facility for the 17 Pittsburgh Opera 4,500,000 18 (CC) Renovations and construction of a low 19 to moderate income senior health care 20 facility 500,000 21 (DD) Acquisition, infrastructure 22 improvements and construction of the 23 Wood Street Commons 3,000,000 24 (EE) Expansion, renovation, infrastructure 25 improvements and construction of the 26 Western Pennsylvania Hospital Campus 10,000,000 27 (FF) Acquisition, renovations, 28 infrastructure improvements and 29 construction for the Western 30 Pennsylvania Hospital School of 20070H1589B4129 - 108 -
1 Nursing 10,000,000 2 (GG) Infrastructure improvements and 3 construction of Mercy Hospital 4 Department of Emergency Medicine 5 facility 10,000,000 6 (HH) Construction, infrastructure, 7 redevelopment and other costs related 8 to the Sterling Plaza II project 5,000,000 9 (II) Acquisition, construction, 10 infrastructure and other costs related 11 to the Ironworkers Local Union No. 3 12 Expansion Project 1,500,000 13 (JJ) Construction, acquisition, 14 redevelopment and other related costs 15 for the Steamfitters Local Union 449 16 Expansion Project 2,500,000 17 (KK) Biotechnology Commercialization 18 project including infrastructure 19 improvements and other related costs 3,000,000 20 (LL) Construction and other costs related 21 to the centralization of facilities for 22 UJF 1,500,000 23 (MM) Construction and other costs related 24 to the renovation of the Little Sisters 25 of the Poor Health Care Pavilion 500,000 26 (NN) Infrastructure improvements, 27 construction and other costs related to 28 the Mary Schenley Building renovations 29 at the Western Pennsylvania School for 30 Blind Children 2,000,000 20070H1589B4129 - 109 -
1 (OO) Infrastructure improvements, 2 construction and other costs related to 3 the Garfield Heights Phase I 4 Redevelopment project 4,000,000 5 (PP) Infrastructure improvements related 6 to construction of the professional 7 hockey arena 302,000 8 (QQ) Acquisition, infrastructure 9 improvements, construction and other 10 costs related to the East Liberty 11 Commercial District project 20,000,000 12 (RR) Acquisition, infrastructure 13 improvements, construction and other 14 costs related to the Oak Hill Phase II 15 project 5,000,000 16 (SS) Construction of South Shore 17 Riverfront Park 1,000,000 18 (TT) Acquisition and construction of 19 building at Carnegie Mellon University 10,000,000 20 (UU) Construction, infrastructure, 21 redevelopment and other costs related 22 to the Bakery Square project 7,000,000 23 (VV) Acquisition, infrastructure 24 improvements, renovations, construction 25 and other costs related to the Wood 26 Street Commons project 3,000,000 27 (WW) Construction of Point Park University 28 and Wood Street Corridor Development 29 project 14,000,000 30 (XX) Infrastructure improvements and 20070H1589B4129 - 110 -
1 construction of the America's Music 2 Crossroads Center 2,000,000 3 (YY) Infrastructure improvements, 4 construction and other related costs 5 for Oakland Portal Project 6 redevelopment 30,000,000 7 (ZZ) Infrastructure improvements, 8 construction, renovations and other 9 related costs for Heinz Hall - 10 Pittsburgh Symphony Orchestra 10,000,000 11 (AAA) Acquisition, infrastructure 12 improvements, construction and other 13 related costs for the North Avenue 14 Block/Federal North project 10,000,000 15 (BBB) Acquisition, infrastructure 16 improvements, construction and other 17 related costs for the Robotics Design 18 and Testing Facility in Hazelwood 6,000,000 19 (CCC) Construction for the Pittsburgh 20 Ballet Theatre expansion 3,000,000 21 (DDD) Acquisition, infrastructure 22 improvements, construction and other 23 related costs for the Armed Forces 24 Institute for Regenerative 25 Medicine/McGowen Institute for 26 Regenerative Medicine project 30,000,000 27 (EEE) Construction and other costs related 28 to the Brew House redevelopment 29 project 3,000,000 30 (FFF) Acquisition, infrastructure 20070H1589B4129 - 111 -
1 improvements construction and other 2 costs related to the Sarah Heinz House 3 Expansion project 500,000 4 (GGG) Acquisition, construction, 5 infrastructure, redevelopment and other 6 related costs for the Mattress Factory 7 Expansion project 250,000 8 (HHH) Acquisition, construction, 9 redevelopment and other costs related 10 to the 31st Ward Community/Recreation 11 Center 1,250,000 <-- 12 CENTER 2,000,000 <-- 13 (III) Acquisition, construction, 14 infrastructure, redevelopment and other 15 costs related to the Armed Forces 16 Institute for Regenerative Medicine at 17 the McGowan Institute 30,000,000 18 (JJJ) Acquisition, construction, 19 infrastructure, redevelopment and other 20 costs related to the Amalgamated 21 Transit Union Local No. 85 project 2,000,000 22 (KKK) ACQUISITION, INFRASTRUCTURE <-- 23 IMPROVEMENTS AND OTHER COSTS RELATED TO 24 THE CONSTRUCTION OF THE LIFE SCIENCES 25 TECHNOLOGY GROWTH AND INCUBATOR 26 PROJECT 10,000,000 27 (LLL) CONSTRUCTION, INFRASTRUCTURE, 28 REDEVELOPMENT AND OTHER RELATED COSTS 29 FOR THE BAUM LIBERTY CROSSING PROJECT 16,000,000 30 (MMM) ACQUISITION, CONSTRUCTION, 20070H1589B4129 - 112 -
1 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 2 RELATED COSTS FOR A ROBOTICS DESIGN AND 3 TESTING FACILITY 6,000,000 4 (NNN) ACQUISITION, CONSTRUCTION, ABATEMENT 5 OF HAZARDOUS MATERIALS AND OTHER 6 RELATED COSTS FOR THE CRAIG ACADEMY 7 FACILITY 5,000,000 8 (OOO) ACQUISITION, CONSTRUCTION, 9 REDEVELOPMENT AND OTHER RELATED COSTS 10 FOR THE THEATER DISTRICT PARKING GARAGE 11 PROJECT 10,000,000 12 (PPP) ACQUISITION, CONSTRUCTION, 13 REDEVELOPMENT AND OTHER RELATED COSTS 14 FOR THE MANCHESTER CITIZENS CORPORATION 15 RENAISSANCE HOUSING PROJECT 400,000 16 (QQQ) CONSTRUCTION, REDEVELOPMENT AND 17 OTHER RELATED COSTS FOR CITY THEATRE 18 RENOVATIONS AND IMPROVEMENTS 4,000,000 19 (RRR) ACQUISITION, CONSTRUCTION, 20 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 21 RELATED COSTS FOR THE CENTRE CITY 22 SQUARE PROJECT 9,500,000 23 (SSS) CONSTRUCTION AND OTHER RELATED COSTS 24 FOR A NEW COMMUNITY CENTER TO SERVE THE 25 CITY'S NORTH SIDE 4,000,000 26 (iii) Baldwin Borough 27 (A) Construction and other related costs 28 to renovate fire department building 500,000 29 (B) Infrastructure improvements and 30 construction for Academy/DBA Community 20070H1589B4129 - 113 -
1 Specialist Corp facility 4,000,000 2 (iv) Bethel Park 3 (A) Construction and other related costs 4 for the Bethel Park Community Center 5 expansion 2,500,000 6 (v) Borough of Wilkinsburg 7 (A) Construction and other related costs 8 for the revitalization of commercial 9 corridor including residential housing 5,000,000 10 (B) Construction, redevelopment and other 11 costs related to the Smart Apartment 12 project 1,500,000 13 (C) ACQUISITION, CONSTRUCTION, <-- 14 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 15 RELATED COSTS FOR THE CRESCENT 16 DEVELOPMENT PROJECT 750,000 17 (v.1) Carnegie Borough 18 (A) Acquisition, construction, 19 infrastructure, redevelopment and other 20 costs related to the Carnegie Borough 21 Business District revitalization 22 program 10,000,000 23 (v.2) Castle Shannon 24 (A) Construction, infrastructure, 25 acquisition, redevelopment and other 26 costs related to the Shannon Station 27 Transit Village 3,000,000 28 (v.3) City of Clairton 29 (A) Design, engineering and construction 30 of US Steel cogeneration facility 25,000,000 20070H1589B4129 - 114 -
1 (B) Demolition and construction for US 2 Steel coke oven project 25,000,000 3 (v.4) City of Clairton and West Mifflin and 4 Braddock Boroughs 5 (A) Construction and other related costs 6 for a new cogeneration facility 25,000,000 7 (B) Construction, abatement of hazardous 8 materials and other costs related to 9 the U.S. Steel Coke Oven project 25,000,000 10 (v.5) Coraopolis Borough 11 (A) Acquisition, construction, 12 infrastructure, redevelopment and other 13 costs related to the Coraopolis Borough 14 Business District revialization 15 program 10,000,000 16 (B) ACQUISITION, CONSTRUCTION, <-- 17 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 18 RELATED COSTS FOR THE PITTSBURGH 19 PLUMBERS TRAINING FACILITY EXPANSION 20 PROJECT 3,000,000 21 (vi) Dravosburg Borough 22 (A) Acquisition, construction and other 23 related costs for the Dravosburg 24 waterfront development 500,000 25 (vi.1) Duquesne City 26 (A) Infrastructure improvements, 27 construction and other costs related to 28 the Burns Heights Duquesne 29 Revitalization project 2,000,000 30 (vi.2) Borough of Edgewood 20070H1589B4129 - 115 -
1 (A) Completion of linear park in Edgewood 2 Borough adjacent to the Port Authority 3 of Allegheny County East Busway 4 facility 3,600,000 5 (B) CONSTRUCTION, INFRASTRUCTURE AND OTHER <-- 6 RELATED COSTS FOR UPGRADES TO THE 7 WESTERN PENNSYLVANIA SCHOOL FOR THE 8 DEAF 2,000,000 9 (VI.3) FINDLAY TOWNSHIP 10 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 11 COSTS RELATED TO THE CHAPMAN COMMERCE 12 CENTER 3,000,000 13 (B) CONSTRUCTION AND OTHER RELATED COSTS 14 FOR WESTPORT DEVELOPMENT PROJECT 10,000,000 15 (VI.4) FOX CHAPEL BOROUGH 16 (A) CONSTRUCTION AND OTHER RELATED COSTS 17 FOR THE LAURIE ANN WEST MEMORIAL 18 LIBRARY 3,500,000 19 (B) ACQUISITION, CONSTRUCTION AND OTHER 20 RELATED COSTS FOR THE BEECHWOOD FARMS 21 NATURE RESERVE EXPANSION AND UPGRADE 22 PROJECT 2,500,000 23 (vii) Glassport Borough 24 (A) Construction and other related costs 25 for the municipal building 26 redevelopment 500,000 27 (B) Acquisition, construction and other 28 related costs for demolition and 29 redevelopment of abandoned properties 500,000 30 (viii) Green Tree Borough 20070H1589B4129 - 116 -
1 (A) Construction and other related costs
2 for Aiken Elementary School
3 improvements 500,000
4 (B) Construction and other related costs
5 for the Green Tree Road improvement
6 project 3,000,000
7 (viii.1) Homestead Borough
8 (A) Infrastructure improvements,
9 renovations and construction of the
10 Historic Homestead Bakery 2,200,000
11 (VIII.2) INDIANA TOWNSHIP <--
12 (A) ACQUISITION, CONSTRUCTION,
13 INFRASTRUCTURE, ABATEMENT OF HAZARDOUS
14 MATERIALS, REDEVELOPMENT AND OTHER
15 RELATED COSTS FOR THE INDIANA TOWNSHIP
16 TOWN HALL AND COMMUNITY CENTER 1,000,000
17 (viii.2) (VIII.3) Liberty Borough <--
18 (A) Renovations and infrastructure
19 improvements to South Allegheny
20 Middle/High School library 1,000,000
21 (ix) Town of McCandless
22 (A) Construction and other related costs
23 for the UPMC Passavant Patient Tower
24 expansion 20,000,000
25 (ix.1) North Park/McCandless Township
26 (A) Facility upgrades and infrastructure
27 improvements to Allegheny County Fire
28 Training Academy 1,000,000
29 (x) City of McKeesport
30 (A) Construction, abatement of hazardous
20070H1589B4129 - 117 -
1 materials and other costs associated 2 with the McKeesport Fire Department 3 building project 1,000,000 4 (B) Construction, infrastructure and other 5 costs associated with the Marshall 6 Drive redevelopment project 500,000 7 (C) Construction, redevelopment and other 8 related costs for the McKeesport 9 Auberle Athletic Complex project 500,000 10 (D) CONSTRUCTION AND OTHER COSTS RELATED <-- 11 TO THE REHABILITATION OF THE FORMER 12 MCKEESPORT CITY HALL FOR BUSINESS OR 13 GOVERNMENT USE 300,000 14 (E) INFRASTRUCTURE IMPROVEMENTS TO LYLE 15 BOULEVARD MIXED-USE DEVELOPMENT 3,000,000 16 (x.1) McKees Rocks Borough 17 (A) Acquisition, infrastructure 18 improvements, construction and related 19 costs for Chartiers Crossing Downtown 20 Revitalization project 7,000,000 21 (B) Redevelopment, construction and other 22 costs related to a cultural arts 23 center 1,500,000 24 (C) Construction and other related costs 25 for the Island Studios project 250,000 26 (x.2) Monroeville Borough 27 (A) Expansion, renovation and construction 28 of Spectrum Charter School 1,000,000 29 (B) Expansion, renovation, infrastructure 30 improvements and construction of 20070H1589B4129 - 118 -
1 facilities for the Western Pennsylvania 2 Hospital - Forbes Regional campus 10,000,000 3 (C) Acquisition, construction and other 4 costs related to the UPMC Healthplex 5 East adult outpatient facility project 5,000,000 6 (D) ACQUISITION AND CONSTRUCTION OF A NEW <-- 7 MONROEVILLE CHAMBER OF COMMERCE 8 BUILDING 2,500,000 9 (E) ACQUISITION AND CONSTRUCTION OF A NEW 10 CONVENTION CENTER OR EXHIBITION HALL 2,500,000 11 (F) CONSTRUCTION, INFRASTRUCTURE AND OTHER 12 COSTS RELATED TO THE TECH ONE BUSINESS 13 PARK 4,000,000 14 (X.3) MOON TOWNSHIP 15 (A) CAPITAL COSTS RELATED TO THE 16 RELOCATION OF THE C.E. KELLEY SUPPORT 17 FACILITY 4,200,000 18 (xi) Mt. Lebanon Township 19 (A) Construction and other related costs 20 for the redevelopment of Washington 21 Road business district 2,500,000 22 (B) Construction and other related costs 23 for a transit-oriented development 24 project 1,000,000 25 (C) Infrastructure, construction, 26 rehabilitation and redevelopment of the 27 Seton-La Salle High School athletic 28 field into a state-of-the-art multiuse 29 athletic facility 500,000 30 (D) Construction, infrastructure, 20070H1589B4129 - 119 -
1 redevelopment and other costs related 2 to the Shady Grove Transit Oriented 3 Development program 500,000 4 (E) Construction, infrastructure, 5 redevelopment, abatement of hazardous 6 materials and other costs related to 7 the Denis Theatre renovation project 2,000,000 8 (F) Acquisition, construction, 9 infrastructure and other costs related 10 to Mt. Lebanon parks improvement 5,000,000 11 (xi.1) Munhall Borough 12 (A) Construction, infrastructure 13 improvements and other costs related to 14 the pump house and water tower 15 development project 5,000,000 16 (xi.2) Natrona Heights 17 (A) Expansion, renovation and construction 18 and infrastructure improvements to 19 Alle-Kiski Medical Center campus 10,000,000 20 (xi.3) Neville Township 21 (A) Acquisition, infrastructure 22 improvements, construction and other 23 costs related to the Neville Crossing 24 revitalization project 3,000,000 25 (xi.4) O'Hara Township 26 (A) Construction of a new community center 27 or renovation of existing community 28 center, including necessary costs 1,000,000 29 (B) CONSTRUCTION AND RELATED COSTS FOR THE <-- 30 BOYD COMMUNITY CENTER 4,500,000 20070H1589B4129 - 120 -
1 (xi.5) Pine Township 2 (A) Construction of a new volunteer fire 3 company facility 2,300,000 4 (xi.6) Robinson Township 5 (A) Infrastructure improvements, 6 construction and other costs related to 7 the Carnegie Museums building and Music 8 Hall renovation projects 2,000,000 9 (xii) Fox Chapel Borough and O'Hara Township 10 (A) Acquisition and construction related 11 to redevelopment of CCLA Laure Ann West 12 Memorial Library 1,000,000 13 (xiii) Coraopolis Borough 14 (A) Construction, infrastructure and other 15 costs related to the development of a 16 recreational stadium and amenities 5,000,000 17 (xiv) McCandless Township 18 (A) Renovation and rehabilitation and 19 technology upgrades to the John J. 20 Wright Library at La Roche College 500,000 21 (xv) Plum Borough 22 (A) Construction, infrastructure and other 23 related costs for a senior health care 24 facility 5,000,000 25 (B) CONSTRUCTION, INFRASTRUCTURE AND OTHER <-- 26 RELATED COSTS FOR THE HANNA HEALTHCARE 27 CENTER PROJECT 500,000 28 (xvi) Penn Hills Township 29 (A) Infrastructure improvements and 30 construction of Imani Christian 20070H1589B4129 - 121 -
1 Academy 2,500,000 2 (B) Acquisition, construction, 3 infrastructure and other related costs 4 for the Thompson Run Industrial Park 3,000,000 5 (C) Construction, infrastructure and other 6 related costs for Allegheny River 7 Boulevard improvements 4,000,000 8 (D) Acquisition, construction, 9 infrastructure, redevelopment and other 10 related costs for the Thompson Run 11 redevelopment project 2,500,000 12 (xvii) Summit Township 13 (A) Infrastructure improvements, 14 renovations and construction of Summit 15 Academy 4,000,000 16 (xviii) White Oak Borough 17 (A) Construction and renovations of a 18 White Oak community recreation and 19 senior citizen center 1,500,000 20 (B) Construction of White Oak Heritage 21 Park Community Center 1,000,000 22 (C) Construction and rehabilitation of the 23 White Oak Athletic Association 24 facilities, including gymnasium, 25 offices and community area 2,500,000 26 (xix) Redevelopment Authority of Allegheny 27 County 28 (A) Acquisition, infrastructure, 29 construction and other related costs 30 for the construction of a LifeSpan - 20070H1589B4129 - 122 -
1 Wellness Center in Moon Township 10,000,000
2 (B) Acquisition, site development,
3 construction and infrastructure for the
4 development of a research and
5 technology park located adjacent to
6 Interstate 79 in South Fayette
7 Township 5,000,000
8 (C) Infrastructure, site development and
9 other construction-related costs in
10 support of a mixed-use development
11 along the University Boulevard
12 Commercial District 5,000,000
13 (XX) ALLEGHENY, ARMSTRONG, BEAVER, BUTLER, <--
14 WASHINGTON AND WESTMORELAND COUNTIES
15 (A) CONSTRUCTION, INFRASTRUCTURE,
16 REDEVELOPMENT AND OTHER RELATED COSTS
17 FOR THE CHILDREN'S HOSPITAL OF
18 PITTSBURGH 30,000,000
19 (XXI) ALLEGHENY, FAYETTE, SOMERSET AND
20 WESTMORELAND COUNTIES
21 (A) CONSTRUCTION AND OTHER RELATED COSTS
22 FOR THE GREAT ALLEGHENY PASSAGE TRAIL
23 AND COMMUNITY IMPROVEMENTS 2,000,000
24 (3) Armstrong County
25 (i) County projects (Reserved) <--
26 (I) COUNTY PROJECTS <--
27 (A) DEVELOPMENT OF A NEW EMERGENCY
28 SERVICES COMMUNICATIONS SYSTEM,
29 INCLUDING LAND ACQUISITION, SITE
30 DEVELOPMENT AND EQUIPMENT PURCHASES 8,000,000
20070H1589B4129 - 123 -
1 (B) ACQUISITION, RENOVATIONS, DEMOLITION 2 AND NEW CONSTRUCTION OF VARIOUS 3 REDEVELOPMENT PROJECTS WITHIN 4 KITTANNING BOROUGH 2,000,000 5 (i.1) Armstrong County Industrial Development 6 Authority 7 (A) Acquisition, infrastructure and 8 construction of the Armstrong 9 Technology Center, a mixed-use 10 facility, including manufacturing 11 space 2,000,000 12 (ii) City of Parker 13 (A) Land acquisition, site development and 14 construction to support the 15 revitalization of downtown Parker 500,000 16 (iii) East Franklin Township 17 (A) Construction, infrastructure and other 18 related costs for Armstrong County 19 Commons 10,000,000 20 (iv) Ford City Borough 21 (A) Construction, acquisition and other 22 necessary costs for Ford City Borough 23 Building/Public Safety Building 250,000 24 (v) Kiskiminetas Township 25 (A) Acquisition, construction and other 26 necessary costs for Kiskiminetas 27 Township Building 1,000,000 28 (V.1) PARKS TOWNSHIP <-- 29 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 30 RELATED COSTS FOR THE KEPPLE HILL ROAD 20070H1589B4129 - 124 -
1 PROJECT 500,000
2 (vi) West Kittanning Borough
3 (A) Acquisition of land, demolition and
4 construction of borough building 500,000
5 (vii) Worthington Borough
6 (A) Construction, demolition and other
7 necessary costs for public safety
8 building 500,000
9 (4) Beaver County
10 (i) County projects (Reserved) <--
11 (I) COUNTY PROJECTS <--
12 (A) Acquisition, construction,
13 infrastructure and other related costs
14 for a family services center 3,000,000
15 (B) Construction, acquisition and other
16 necessary costs for new facility to
17 manufacture soap and other similar
18 products 5,000,000
19 (i.1) City of Aliquippa
20 (A) Infrastructure improvements and
21 construction of ethanol production
22 facility in the Aliquippa Industrial
23 Park 6,000,000
24 (i.2) City of Beaver Falls
25 (A) Construction and renovations to the
26 SBC Ministries, Inc., facility 500,000
27 (ii) Center Township
28 (A) Acquisition, construction,
29 infrastructure and other related costs
30 for the Gateway Youth Services Center 3,000,000
20070H1589B4129 - 125 -
1 (iii) Midland Borough 2 (A) Acquisition, construction, 3 infrastructure and other related costs 4 for the Beaver County Industrial 5 Museum 1,500,000 6 (5) Bedford County 7 (i) County projects 8 (A) Infrastructure, construction and other 9 related costs for the Bedford Memorial 10 Surgery Center project at the 11 University of Pittsburgh Medical 12 Center 5,000,000 13 (ii) West Providence Township 14 (A) Acquisition and construction of 15 Everett Business Center 1,500,000 16 (6) Berks County 17 (i) County projects 18 (A) Carpenter Technology, expansion 19 project, for construction, 20 infrastructure improvements and other 21 related costs for a manufacturing and 22 economic development project 27,000,000 23 (B) Land acquisition, infrastructure 24 improvements and construction necessary 25 to maintain the competitive position of 26 an existing business entity or for the 27 development of business-ready sites for 28 potential business tenants 1,000,000 29 (C) Acquisition, infrastructure 30 improvements and construction for 20070H1589B4129 - 126 -
1 state-of-the-art food processing plant 2 for the Pennsylvania agribusiness 3 industry 2,500,000 4 (D) Acquisition, infrastructure 5 improvements and construction for 6 Thoroughbred Horse Training Facility 10,000,000 7 (ii) Bern Township 8 (A) Acquisition, infrastructure 9 improvements and construction of the 10 Reading Regional Airport Biotech 11 Research Industrial Park 5,000,000 12 (iii) City of Reading 13 (A) Infrastructure improvements and 14 construction, including parking, for 15 Cedarpak 5,000,000 16 (B) Construction of Berks Community 17 Foundation green office building at 3rd 18 and Washington Streets 5,300,000 19 (C) Infrastructure improvements and 20 construction of the Angelica 21 Environmental Center 3,800,000 22 (D) Infrastructure improvements and 23 construction of City Park recreational 24 facilities 2,750,000 25 (E) Infrastructure improvements, 26 renovations and construction of the 27 Reading Pagoda 15,000,000 28 (F) Acquisition, infrastructure 29 improvements and construction for 30 security system 1,000,000 20070H1589B4129 - 127 -
1 (G) Acquisition, infrastructure 2 improvements and construction for the 3 redevelopment of land and properties on 4 the east side of the Schuylkill River 5,000,000 5 (H) Acquisition, infrastructure 6 improvements and construction for the 7 rehabilitation and development of North 8 Reading Industrial Tract 30,000,000 9 (I) Infrastructure improvements and 10 construction of a new science center 11 for Albright College 7,000,000 12 (J) Acquisition, demolition and 13 construction of Buttonwood, Miltmore, 14 Gordon and Tulpehocken Streets 15 townhouse project 8,000,000 16 (K) Acquisition, infrastructure 17 improvements and construction for 18 renovations of buildings in the 400 19 block of Penn Street 3,000,000 20 (L) Infrastructure improvements and 21 construction to convert the Liberty 22 Fire Company to the Reading Area 23 Firefighters Museum 1,565,000 24 (M) Infrastructure improvements and 25 construction of a new entrance to 26 Alvernia College 2,500,000 27 (N) Infrastructure improvements and 28 construction for an addition to the 29 Alvernia College Health and Wellness 30 Center 6,000,000 20070H1589B4129 - 128 -
1 (O) Infrastructure improvements and 2 construction for Angelica Park access 3 and field and buildings rehabilitation 4 project 4,000,000 5 (P) Infrastructure improvements and 6 construction of Reading Area Community 7 College academic classroom 8 instructional center 20,000,000 9 (Q) Infrastructure improvements for 10 Reading Hospital, including equipment 11 upgrades 10,000,000 12 (R) Acquisition, infrastructure 13 improvements and construction for 14 redevelopment of the former Garden 15 State Tanning building 4,500,000 16 (S) Infrastructure improvements and 17 construction of the First Energy 18 Stadium 26,000,000 19 (T) Acquisition, demolition, 20 infrastructure improvements and 21 construction of apartments and shops at 22 3rd and Court Streets 7,000,000 23 (U) Acquisition, infrastructure 24 improvements and construction of 25 convention center hotel and parking 26 garage 62,000,000 27 (V) Acquisition, infrastructure 28 improvements and construction for the 29 expansion of Goggle Works No. 2 30 building for a children's museum and 20070H1589B4129 - 129 -
1 school for the arts 7,000,000 2 (W) Acquisition, infrastructure 3 improvements and construction of 7th 4 and Penn Streets office building 6,000,000 5 (X) Acquisition, demolition, 6 infrastructure improvements and 7 construction of South 8th Street 8 supermarket and retail shop complex 1,000,000 <-- 9 SUPERMARKET AND RETAIL SHOP COMPLEX 6,000,000 <-- 10 (Y) Infrastructure improvements and 11 construction for restoration and 12 renovation of Trexler Mansion for 13 Daniel Torres Hispanic Center 3,000,000 14 (Z) Acquisition, infrastructure 15 improvements, construction and other 16 costs associated with the Buttonwood 17 Street Brownfield Rehabilitation 18 project 2,000,000 19 (AA) Infrastructure improvements and 20 renovation for the Reading Public 21 Museum 2,500,000 22 (BB) Acquisition, infrastructure 23 improvements, construction and other 24 costs related to the renovation of 25 buildings in the 400 and 500 blocks of 26 Penn Street 8,000,000 27 (CC) Infrastructure improvements and 28 construction of former railroad bridge 29 as part of a public trail, RAAC bridge 30 improvement project 1,500,000 20070H1589B4129 - 130 -
1 (DD) GOGGLE WORKS AREA RENEWAL, DEMOLITION <-- 2 AND CONSTRUCTION OF NEW AND RESTORED 3 BUILDINGS TO HOUSE SHOPS, APARTMENTS 4 AND OFFICE SPACE ON PENN STREET FROM 5 2ND TO 9TH STREETS AND 4TH TO 6TH 6 STREETS FROM PENN TO CHESTNUT STREETS 7 AND WASHINGTON STREET FROM 2ND TO 3RD 8 STREETS IN THE AREA ADJOINING GOGGLE 9 WORKS 5,000,000 10 (EE) RENOVATION AND UPDATE OF THE YMCA 11 BUILDING AT 6TH AND WASHINGTON STREETS 5,000,000 12 (FF) ACQUISITION AND DEMOLITION OF AN 13 ABANDONED BLIGHTED FULL CITY BLOCK 14 FACTORY FOR DEVELOPMENT INTO TOWNHOUSES 15 AND RECREATION AREA 5,000,000 16 (GG) ACQUISITION, REFURBISHING AND PARTIAL 17 DEMOLITION OF THE FORMER LUDEN'S CANDY 18 FACTORY ON NORTH 8TH STREET FOR REUSE 19 AND PARKING 4,000,000 20 (iv) Hamburg Borough 21 (A) Construction and related 22 infrastructure for the Hamburg Area 23 High School stadium project 500,000 24 (v) Kutztown Borough 25 (A) Infrastructure improvements and 26 construction for security upgrades for 27 the borough, including parts of 28 Kutztown University campus 2,000,000 29 (V.1) RICHMOND TOWNSHIP <-- 30 (A) ACQUISITION, CONSTRUCTION, 20070H1589B4129 - 131 -
1 INFRASTRUCTURE AND OTHER RELATED COSTS 2 FOR A RECYCLING, MANUFACTURING AND 3 ECONOMIC DEVELOPMENT PROJECT AT EAST 4 PENN MANUFACTURING COMPANY 45,000,000 5 (vi) Topton Borough 6 (A) Infrastructure improvements and 7 construction for the renovation and 8 expansion of Topton Borough Hall 1,500,000 9 (vii) West Reading Borough 10 (A) Land acquisition and construction of a 11 new boardwalk trail at West Shore 12 Boardwalk 5,000,000 13 (B) Acquisition, infrastructure 14 improvements, construction and other 15 costs related to the Giggleworks 16 Children's Museum 2,000,000 17 (7) Blair County 18 (i) County projects (Reserved) 19 (ii) Altoona Blair County Development 20 Corporation 21 (A) Acquisition, construction and 22 redevelopment of downtown Altoona in 23 the vicinity of the AmTrain intermodal 24 facility 5,000,000 25 (B) Acquisition, infrastructure, 26 construction and other costs related to 27 the development of a multifunctional 28 complex located at the South Altoona 29 Business Park 5,500,000 30 (C) Land acquisition, infrastructure and 20070H1589B4129 - 132 -
1 construction of access improvements to 2 support the redevelopment of the former 3 Hollidaysburg Car Shop property 2,500,000 4 (D) Acquisition, infrastructure and 5 construction of the Kettle Creek mixed- 6 use development in Logan Township 5,000,000 7 (E) Land acquisition, infrastructure, 8 environmental cleanup, design and 9 construction of a business park along 10 the I-99 corridor 4,000,000 11 (F) Acquisition, infrastructure, 12 construction and redevelopment of a 13 multifunctional complex located along 14 the I-99 corridor with emphasis on the 15 I-99 Enterprise Campus site 4,000,000 16 (G) Land acquisition, infrastructure, 17 redevelopment and construction of a 18 Transportation Research and Education 19 Center of Excellence complex along the 20 I-99 corridor 5,000,000 21 (iii) City of Altoona 22 (A) Acquisition, construction and 23 infrastructure related to the 24 renovation of Mishler Theatre 2,100,000 25 (B) Land acquisition, design and 26 construction of a parking garage and 27 transportation center 5,000,000 28 (C) Construction of a multipurpose 29 facility to include parking garage, 30 small hotel, retail and offices at 1400 20070H1589B4129 - 133 -
1 12th Avenue 7,500,000 2 (D) CONSTRUCTION OF A PHYSICAL FITNESS AND <-- 3 RECREATIONAL SPORTS COMPLEX FOR HIGH 4 SCHOOL AND COMMUNITY USE WITHIN THE 5 ALTOONA AREA SCHOOL DISTRICT 500,000 6 (iv) Logan Township 7 (A) Acquisition, construction, 8 infrastructure and other costs related 9 to the redevelopment of Kettle Creek 10 Mixed-Use Development 5,000,000 11 (B) CONSTRUCTION, INFRASTRUCTURE, <-- 12 REDEVELOPMENT AND OTHER RELATED COSTS 13 FOR THE BLAIR COUNTY BALLPARK PROJECT 6,000,000 14 (8) Bradford County 15 (i) County projects (Reserved) 16 (ii) Central Bradford Progress Authority 17 (A) Infrastructure, design, equipment and 18 other related costs for information 19 systems and technology upgrades at the 20 Towanda Memorial Hospital 1,200,000 21 (III) NORTH TOWANDA TOWNSHIP <-- 22 (A) CONSTRUCTION, EXPANSION, IMPROVEMENTS 23 AND OTHER RELATED COSTS FOR DUPONT 24 COMPANY IMAGING TECHNOLOGY 25,000,000 25 (9) Bucks County 26 (i) County projects 27 (A) Acquisition and demolition of flood- 28 damaged properties in the Oak Tree 29 section of Bristol Township 500,000 30 (B) Renovations, construction and 20070H1589B4129 - 134 -
1 expansion of the historic Mercer 2 Museum, Bucks County Historical 3 Society 5,000,000 4 (C) Acquisition, renovations, construction 5 and other related costs for the 6 rehabilitation and expansion of the 7 Network of Victim Assistance (NOVA) 8 headquarters in Jamison 1,000,000 9 (D) Rehabilitation and construction of a 10 health care and diagnostic center 4,000,000 11 (E) Infrastructure, construction and other 12 related costs for the redevelopment of 13 the Horizon Corporate Center 4,500,000 14 (F) Construction and renovations of an 15 inpatient Mother/Baby Unit at the St. 16 Mary Medical Center 1,000,000 17 (G) Construction and renovations of an 18 inpatient unit at the St. Mary Medical 19 Center for the purposes of creating a 20 private room medical-surgical unit 1,250,000 21 (H) Bucks County Community College 22 (I) Renovations and ADA accessibility 23 improvements to a gymnasium 1,000,000 24 (II) Renovations and upgrades to the 25 Rollins Student Center 1,351,000 26 (III) Construction of a classroom and 27 faculty office building 8,000,000 28 (ii) Bensalem Township 29 (A) Renovation of the Mack Park recreation 30 complex, including construction 250,000 20070H1589B4129 - 135 -
1 (B) Infrastructure, construction and other 2 related costs for renovations of the 3 Bensalem Emergency Medical Services 4 headquarters 1,000,000 5 (C) Construction and other necessary costs 6 for expansion of police administrative 7 building 3,000,000 8 (D) Acquisition of 120 acres of golf 9 course property for community access 5,000,000 10 (E) Acquisition of 50 acres of property in 11 the Trevose section of Bensalem 12 Township for community access 3,000,000 13 (F) Acquisition of land along the Delaware 14 riverfront for community access 7,000,000 15 (G) Construction of emergency services 16 training facility for police, fire and 17 rescue services 6,000,000 18 (H) CONSTRUCTION AND RELATED COSTS FOR <-- 19 RESIDENCE BUILDINGS TO HOUSE INPATIENT 20 BEDS FOR A DRUG AND ALCOHOL TREATMENT 21 PROGRAM 1,000,000 22 (I) CONSTRUCTION AND OTHER RELATED COSTS 23 OF WATERFRONT TRANSIT-ORIENTED 24 DEVELOPMENT FOR BUCKS COUNTY 25 REDEVELOPMENT AUTHORITY 5,000,000 26 (iii) Bristol Borough 27 (A) Construction, infrastructure and other 28 related costs for parking facilities 3,000,000 29 (B) Construction, infrastructure and other 30 related costs for waterfront 20070H1589B4129 - 136 -
1 development 2,000,000 2 (C) Acquisition, construction, 3 infrastructure and other related costs 4 for waterfront development along the 5 Delaware River 2,000,000 6 (D) Acquisition, construction, 7 infrastructure and other related costs 8 for Elm and Chestnut Streets 9 redevelopment 2,500,000 10 (E) Infrastructure, renovation, expansion 11 and other related construction costs 12 for the Regional Public Safety Training 13 Center 600,000 14 (F) Infrastructure, construction, 15 redevelopment and enhancement of the 16 Memorial Fields, located at Jefferson 17 Avenue and Garden Street 750,000 18 (iv) Bristol Township 19 (A) Infrastructure, redevelopment and 20 other related costs to convert the 21 Lower Bucks Hospital to a full 22 telemetry-based hospital 1,000,000 23 (B) Infrastructure, redevelopment and 24 other related costs for Lower Bucks 25 Hospital security upgrades and 26 bioterrorism training 575,000 27 (C) Construction, infrastructure and other 28 related costs to rebuild the Lower 29 Bucks Hospital Patient Unit 4F 3,000,000 30 (D) Infrastructure, redevelopment and 20070H1589B4129 - 137 -
1 other related costs to purchase three 2 portable orthopedic X-ray machines for 3 Lower Bucks Hospital 420,000 4 (E) Construction, infrastructure and other 5 related costs for the renovation of the 6 Bristol Township municipal building 8,000,000 7 (F) Infrastructure, redevelopment and 8 other related costs to build a Lower 9 Bucks Hospital vascular lab 2,000,000 10 (G) Infrastructure, redevelopment and 11 other related costs for safety and code 12 upgrades for Lower Bucks Hospital 2,500,000 13 (H) Infrastructure, redevelopment and 14 other related costs to purchase a 64- 15 slice CT scanner for Lower Bucks 16 Hospital 2,500,000 17 (I) Infrastructure, redevelopment and 18 other related costs to purchase two 19 digital mammography systems for Lower 20 Bucks Hospital 725,000 21 (J) Infrastructure, redevelopment and 22 other related costs to purchase 23 Computerized Physician Order Entry 24 (CPOE) systems for Lower Bucks 25 Hospital 1,500,000 26 (IV.1) BUCKINGHAM TOWNSHIP <-- 27 (A) ACQUISITION, CONSTRUCTION, 28 INFRASTRUCTURE AND OTHER RELATED COSTS 29 OF A NEW FACILITY FOR THE BUCKS COUNTY 30 CHILDREN'S MUSEUM 1,500,000 20070H1589B4129 - 138 -
1 (v) Chalfont Borough 2 (A) Acquisition and construction for 3 Chalfont Firehouse 500,000 4 (B) Acquisition, construction, 5 infrastructure and other costs related 6 to the expansion of The Children's 7 Hospital of Philadelphia Specialty Care 8 and Ambulatory Surgery Center 500,000 9 (v.1) Doylestown Township 10 (A) Renovations and construction of a new 11 Emergency Department at the Doylestown 12 Hospital 30,000,000 13 (vi) Falls Township 14 (A) Construction and other related costs 15 for the Falls Township Senior Citizen 16 Center 1,000,000 17 (vii) Hilltown Township 18 (A) Construction and restoration of Pearl 19 S. Buck House 1,000,000 20 (viii) Hulmeville Borough 21 (A) Renovations and expansion of the 22 William Penn Fire Company substation 500,000 23 (ix) Langhorne Borough 24 (A) Expansion and renovation of St. Mary's 25 Hospital, including construction 1,000,000 26 (ix.1) Lower Southampton Township 27 (A) Acquisition, construction and other 28 costs related to the Lower Southampton 29 Area Community Center 5,000,000 30 (x) Middletown Township 20070H1589B4129 - 139 -
1 (A) Construction and other related costs 2 for the Middletown Community Center 1,500,000 3 (B) Construction, redevelopment and other 4 costs related to the St. Mary Medical 5 Center 2,500,000 6 (X.1) MORRISVILLE BOROUGH <-- 7 (A) ACQUISITION, CONSTRUCTION, 8 INFRASTRUCTURE AND OTHER RELATED COSTS 9 FOR THE NEW MORRISVILLE FIRE COMPANY 10 BUILDING 1,000,000 11 (xi) Nockamixon Township 12 (A) Renovation of Central Bucks Senior 13 Center, including construction and 14 related infrastructure 60,000 15 (xi.1) Northampton Township 16 (A) Construction and necessary costs for 17 new building for police department 1,250,000 18 (B) Improvements to historic Dolington 19 streetscape, including sidewalks 2,100,000 20 (C) Northampton Township park and 21 recreation capital improvements 750,000 22 (xii) Sellersville Borough 23 (A) Construction of the Recovery Center at 24 Penn Foundation, including related 25 infrastructure costs 1,000,000 26 (xiii) Warrington Township 27 (A) Construction of West End Fire Station, 28 including related infrastructure 500,000 29 (xiii.1) Warwick Township 30 (A) Construction of new building for 20070H1589B4129 - 140 -
1 Warwick Township Fire Company, 2 including necessary costs 1,000,000 3 (xiv) Quakertown Borough 4 (A) Construction and rehabilitation of 5 Upper Bucks YMCA 2,000,000 6 (10) Butler County 7 (i) County projects 8 (A) Community Development Corporation of 9 Butler County 10 (I) Acquisition, infrastructure, 11 construction and development of the 12 Buffalo Township Business and 13 Technology Park, located on a 40- 14 acre parcel of land at the 15 intersection of Route 28 and Route 16 356 1,500,000 17 (II) Infrastructure, construction and 18 renovation of the former Pullman 19 Standard office building for use as 20 a multitenant, mixed-use facility 3,000,000 21 (III) Acquisition, infrastructure, 22 construction and redevelopment of a 23 20-acre parcel of brownfield land 24 in the former jet fuel additive 25 facility in Forward Township 1,000,000 26 (B) Renovations and construction of the 27 central historical museum and 28 preservation of several other 29 historical properties 2,000,000 30 (C) Construction of the Alameda Sports and 20070H1589B4129 - 141 -
1 Exhibition Complex 4,000,000 2 (D) Infrastructure, development and 3 construction of a new arts and cultural 4 center on the Butler County Community 5 College campus in Butler Township 6,600,000 6 (E) Acquisition, construction, 7 infrastructure and other related costs 8 for a new inpatient facility at Butler 9 Memorial Hospital 20,000,000 10 (F) Infrastructure, construction and 11 renovation of the Beck Library and 12 Learning Resource Center at Butler 13 County Community College 1,500,000 14 (ii) City of Butler 15 (A) Construction and related costs for 16 redevelopment of downtown district, 17 including related infrastructure 6,000,000 18 (B) Acquisition and development of former 19 Pullman Standard Office Building for 20 use as a multi-tenant facility 3,000,000 21 (iii) Buffalo Township 22 (A) Acquisition, construction and related 23 infrastructure for Business and 24 Technology Park 1,500,000 25 (iv) Butler Township 26 (A) Construction of Butler Crossing 27 project, including related 28 infrastructure 6,000,000 29 (v) Forward Township 30 (A) Acquisition and construction of 20070H1589B4129 - 142 -
1 business park, including related 2 infrastructure 1,000,000 3 (vi) Jackson Township 4 (A) Infrastructure, site development and 5 other construction-related activities 6 in support of preparing property along 7 Route 19 in the vicinity of Route 528 8 for economic development 5,000,000 9 (VII) SLIPPERY ROCK BOROUGH <-- 10 (A) INFRASTRUCTURE, DEVELOPMENT, 11 CONSTRUCTION AND OTHER RELATED COSTS 12 FOR THE PERFORMING ARTS CENTER AT 13 SLIPPERY ROCK UNIVERSITY 10,000,000 14 (11) Cambria County 15 (i) County projects 16 (A) Construction of Workforce Development 17 Center for Pennsylvania Highlands 18 Community College 500,000 19 (B) Construction and renovations for the 20 Cambria County War Memorial 1,000,000 21 (C) ACQUISITION, CONSTRUCTION AND OTHER <-- 22 RELATED COSTS TO ESTABLISH A HEALTH AND 23 BIOSCIENCE EDUCATIONAL FACILITY 6,000,000 24 (D) CONSTRUCTION, INFRASTRUCTURE 25 IMPROVEMENTS AND OTHER COSTS RELATED TO 26 A SCHOOL OF NURSING AT THE UNIVERSITY 27 OF PITTSBURGH AT JOHNSTOWN 4,000,000 28 (ii) City of Johnstown 29 (A) Acquisition, construction, 30 infrastructure and other related costs 20070H1589B4129 - 143 -
1 for brownfield redevelopment including 2 Festival Park 5,000,000 3 (B) Acquisition, construction, 4 infrastructure and other related costs 5 for downtown housing redevelopment 5,000,000 6 (C) Acquisition, construction, 7 infrastructure and other related costs 8 for Greater Johnstown YMCA 9 redevelopment including a community 10 center 5,000,000 11 (D) Acquisition, infrastructure 12 improvements and construction for the 13 Greater Johnstown Regional Tech Park, 14 phases II and III 7,000,000 15 (E) CONSTRUCTION AND OTHER RELATED COSTS <-- 16 FOR A NEW HEALTH AND BIO SCIENCES 17 FACILITY AT THE UNIVERSITY OF 18 PITTSBURGH AT JOHNSTOWN 3,500,000 19 (II.1) EBENSBURG BOROUGH 20 (A) REHABILITATION OF EXISTING BUILDINGS, 21 CONSTRUCTION AND INFRASTRUCTURE RELATED 22 TO EBENSBURG DOWNTOWN REVITALIZATION 1,000,000 23 (iii) Richland Township 24 (A) Acquisition, construction, 25 infrastructure and other related costs 26 for the East Hills redevelopment 27 including a recreation center 7,000,000 28 (12) Cameron County (Reserved) 29 (13) Carbon County 30 (i) County projects 20070H1589B4129 - 144 -
1 (A) Land acquisition, infrastructure 2 improvements and construction necessary 3 to maintain the competitive position of 4 an existing business entity or for the 5 development of business-ready sites for 6 potential business tenants 1,000,000 7 (ii) Jim Thorpe 8 (A) Renovations for the Carbon County 9 Courthouse 500,000 10 (B) Renovations for the Carbon County 11 Courthouse Annex 300,000 12 (C) Acquisition, construction, 13 infrastructure, redevelopment and other 14 costs related to the Flagstaff Resort 15 Gondola project 2,500,000 16 (II.1) KIDDER TOWNSHIP <-- 17 (A) ACQUISITION, CONSTRUCTION, 18 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 19 RELATED COSTS FOR THE KIDDER TOWNSHIP 20 EMERGENCY SERVICES BUILDING 1,500,000 21 (ii.1) (II.2) Lehighton Borough <-- 22 (A) Acquisition, construction, 23 infrastructure, redevelopment and other 24 related costs for a new fire department 25 building 1,750,000 26 (ii.2) (II.3) Mahoning Township <-- 27 (A) Construction, redevelopment and other 28 related costs for the Mahoning Township 29 municipal building 750,000 30 (iii) Mahoning and Lehighton 20070H1589B4129 - 145 -
1 (A) Infrastructure improvements, 2 development and related costs for the 3 Packerton Yards Industrial Park 3,000,000 4 (B) Construction, infrastructure, 5 redevelopment, abatement of hazardous 6 materials and other costs related to 7 the Packerton Yards Industrial Park 8 site improvements 1,250,000 9 (III.1) NESQUEHONING BOROUGH <-- 10 (A) CONSTRUCTION, REDEVELOPMENT AND OTHER 11 COSTS RELATED TO THE AMETEK EXPANSION 12 PROJECT 3,000,000 13 (iv) Palmerton Borough 14 (A) Construction, infrastructure and other 15 related costs for the regional Wall 16 Street West Initiative 25,000,000 17 (iv.1) Summit Hill Borough 18 (A) Construction, infrastructure and other 19 related costs for restoration of the 20 Switchback Gravity Railroad site 8,000,000 21 (v) Weatherly Borough 22 (A) Acquisition, construction, 23 infrastructure and other related costs 24 for the railroad/steel revitalization 25 project 1,500,000 26 (B) Acquisition, construction, 27 infrastructure, redevelopment and other 28 related costs for a new municipal 29 complex, including volunteer fire 30 department buildings 2,500,000 20070H1589B4129 - 146 -
1 (14) Centre County 2 (i) County projects 3 (A) Construction, infrastructure and other 4 related costs for the expansion of CPI 5 Workforce Development 1,000,000 6 (B) Construction, infrastructure and other 7 related costs for a new biofuels plant 25,000,000 8 (C) Construction, infrastructure and other 9 related costs for the Phillipsburg 10 Borough Hall 2,000,000 11 (D) Acquisition, construction and other 12 related costs for the Hope and Reliance 13 United Firefighter Center 1,000,000 14 (E) Acquisition, construction, 15 infrastructure and other related costs 16 for the Centre County Recreation 17 Center 20,000,000 18 (F) Construction, infrastructure and other 19 related costs for the Moshannon Valley 20 Economic Partnership Industrial Park 1,000,000 21 (G) Infrastructure, construction and other 22 related costs for the redevelopment of 23 lands adjacent to the Colonnade 24 Shopping Center 5,000,000 25 (H) Acquisition of a 20-acre parcel of 26 land, site development and construction 27 of facilities, including transportation 28 and medical arts training centers 5,000,000 29 (I) Acquisition, construction, 30 infrastructure and other related costs 20070H1589B4129 - 147 -
1 for Centre County PAWS 350,000 2 (J) Acquisition, construction, renovation, 3 infrastructure and other related costs 4 for a medical facility in the Moshannon 5 Valley area 3,000,000 6 (i.1) Bellefonte Borough 7 (A) Acquisition, infrastructure 8 improvements and construction for 9 County Seat parking and transit 10 facility 2,500,000 11 (ii) Centre Hall Borough 12 (A) Acquisition, construction, 13 infrastructure and other related costs 14 for the Grange Fair Multipurpose 15 Complex 750,000 16 (ii.1) Phillipsburg Borough 17 (A) Infrastructure, redevelopment and 18 other related costs for Phillipsburg 19 Hospital renovations and improvements 1,500,000 20 (iii) State College Borough 21 (A) Acquisition, construction, 22 infrastructure and other related costs 23 for a downtown redevelopment project 12,000,000 24 (15) Chester County 25 (i) County projects 26 (A) Construction, acquisition and related 27 infrastructure for the Southeastern 28 Chester County Refuse Authority 550,000 29 (B) Improvements to buildings located 30 within the Lukens' National Historic 20070H1589B4129 - 148 -
1 District campus, including necessary 2 costs 2,000,000 3 (C) CONSTRUCTION AND RELATED COSTS FOR A <-- 4 HYBRID SCHOOL AS A JOINT PROJECT OF THE 5 CHESTER COUNTY INTERMEDIATE UNIT AND 6 DELAWARE COUNTY COMMUNITY COLLEGE 2,000,000 7 (i.1) City of Coatesville 8 (A) Acquisition, infrastructure, 9 environmental remediation, construction 10 and other related costs for the 11 redevelopment of a brownfield property 12 known as the Flats property 20,000,000 13 (ii) Downingtown Borough 14 (A) Acquisition, construction, 15 infrastructure and other related costs 16 for River Station Downingtown 17 Redevelopment 9,500,000 18 (B) Infrastructure improvements and 19 construction of pedestrian and bike 20 path system along the Brandywine Creek 21 connecting to the Struble Trail 500,000 22 (C) Construction, infrastructure 23 improvements and other related costs 24 for the Downingtown Senior Center and 25 library expansion project 1,500,000 26 (ii.1) Malvern Borough and East Whiteland 27 Township 28 (A) Infrastructure improvements, 29 renovations and construction for the 30 Bishop Tube complex 2,500,000 20070H1589B4129 - 149 -
1 (ii.2) Malvern Borough 2 (A) Infrastructure and construction of the 3 Malvern Fire Company building 500,000 4 (ii.3) Phoenixville Borough 5 (A) Phoenixville library expansion and 6 construction of a new facility 1,000,000 7 (B) CONSTRUCTION, INFRASTRUCTURE AND OTHER <-- 8 RELATED COSTS FOR A BOROUGH PARKING 9 GARAGE 3,500,000 10 (iii) Schuylkill Township 11 (A) Expansion of the Phoenixville YMCA, 12 including construction 3,000,000 13 (iv) Spring City Borough 14 (A) Spring City library expansion and 15 construction of a new facility 1,200,000 16 (v) South Coatesville Borough and East 17 Fallowfield Township 18 (A) Infrastructure improvements and 19 construction of Chester County fire- 20 police training facility 2,000,000 21 (B) Construction and related 22 infrastructure to expand the Jenkins 23 Arboretum Education Center 1,000,000 24 (vi) West Bradford Township 25 (A) Infrastructure improvements and 26 construction of a new animal shelter 27 and medical facility 1,000,000 28 (vi.1) West Chester 29 (A) Chester County Historical Society, 30 building renovation improvements, 20070H1589B4129 - 150 -
1 including construction and other 2 related costs 1,000,000 3 (B) Acquisition, infrastructure 4 improvements and construction of 5 Undergraduate Business Center at West 6 Chester University of Pennsylvania 3,000,000 7 (C) Acquisition, construction, 8 infrastructure and other costs related 9 to the expansion of the Hickman Senior 10 Housing project 2,000,000 11 (D) Construction, infrastructure, 12 redevelopment and other costs related 13 to the Mosteller Parking Garage 14 replacement project 1,000,000 15 (E) CONSTRUCTION, REDEVELOPMENT AND OTHER <-- 16 COSTS RELATED TO THE CHARLES MELTON 17 COMMUNITY CENTER 1,000,000 18 (vii) West Chester Borough and West Goshen 19 Township 20 (A) Infrastructure improvements and 21 construction of a cardiovascular center 22 at Chester County Hospital 10,000,000 23 (viii) West Pikeland Township 24 (A) Renovations to the Historic Washington 25 Building at Historic Yellow Springs, 26 including infrastructure improvements 27 and construction 750,000 28 (ix) Willistown Township 29 (A) Infrastructure improvements and 30 construction of a nature and community 20070H1589B4129 - 151 -
1 center on Willistown's Okehocking 2 Preserve 1,000,000 3 (16) Clarion County 4 (i) County projects 5 (A) Infrastructure, construction, 6 redevelopment and other related costs 7 for the construction of a reservoir/dam 8 to provide an alternate water supply 9 for the Beaver Creek Keystone 10 Innovation Zone 100,000 11 (B) Infrastructure, construction, 12 rehabilitation and other related costs 13 for improvements to a water supply that 14 serves the Clarion County Commerce 15 Center Keystone Opportunity Zone and 16 the Knox Industrial Park 375,000 17 (C) Redevelopment and construction of 18 incubator space within the Clarion 19 University Biotechnology Business 20 Development Center and incubator 21 facility located in the Trinity Point 22 Technology Park 850,000 23 (ii) Foxburg Borough 24 (A) Site development and construction of 25 Municipal Center Building to support 26 downtown revitalization 3,000,000 27 (iii) Clarion Borough 28 (A) Infrastructure and construction of a 29 sidewalk along Greenville Avenue from 30 Rheinhard Village to Clarion 20070H1589B4129 - 152 -
1 University 500,000 2 (iv) Clarion Township 3 (A) Site development and construction of 4 Clarion County YMCA facility, including 5 land acquisition and related 6 infrastructure 3,500,000 7 (B) Expansion of Clarion County YMCA 5,000,000 8 (17) Clearfield County 9 (i) County projects 10 (A) Construction and other related costs 11 for the Wood Pellet Mill project 1,000,000 12 (B) Construction and other costs 13 associated with the Biomass Conversion 14 Center of Excellence 2,750,000 15 (C) Construction, infrastructure and other 16 costs related to coal gasification 17 project 20,000,000 18 (D) Expansion of facilities to accommodate 19 Health Information Technology (HIT) and 20 Western PA Health Information 21 Connection (HIC), including 22 construction of a new 10,000-square- 23 foot building and associated 24 infrastructure improvements at DuBois 25 Regional Medical Center 875,000 26 (E) Construction, infrastructure and other 27 related costs for a coal-fired power 28 plant 20,000,000 29 (ii) Clearfield Borough 30 (A) Acquisition, construction, 20070H1589B4129 - 153 -
1 infrastructure and other related costs 2 for riverfront development 6,000,000 3 (B) Construction, infrastructure and other 4 related costs for a riverwalk, park 5 revitalization and fish ladder along 6 the Susquehanna River 2,500,000 7 (C) Construction, infrastructure and other 8 related costs for business district 9 parking facilities 5,000,000 10 (D) Construction of a new center for 11 performing arts as part of the downtown 12 Clearfield revitalization, including 13 land acquisition and infrastructure 14 improvements 2,000,000 15 (E) Construction and infrastructure 16 improvements for the development of the 17 Clearfield Renewable Energy District 5,000,000 18 (F) Downtown redevelopment, including 19 pedestrian enhancements necessary to 20 implement a strategy to encourage 21 business and governmental entities to 22 relocate to the borough 5,000,000 23 (G) Construction of a new centralized 24 firehouse to support the consolidation 25 of four existing fire departments, 26 including land acquisition and 27 infrastructure improvements 1,500,000 28 (H) Construction of a 300-space parking 29 facility to be located near the 30 Clearfield County Courthouse, including 20070H1589B4129 - 154 -
1 land acquisition and infrastructure 2 improvements 5,000,000 3 (I) Clearfield Hospital imaging department 4 improvements, including acquisition of 5 a 1.5T High Field Strength Short Bore 6 MRI, Breast MRI Computer Aided 7 Detection System, Dual Head Nuclear 8 Medicine Camera and Full body axial fan 9 beam bone densitometer 1,045,000 10 (J) Renovation and expansion of the 11 Emergency Department of Clearfield 12 Hospital to increase capacity from 12 13 beds to 24 beds 1,750,000 14 (ii.1) City of DuBois 15 (A) Acquisition, construction, 16 redevelopment and other costs related 17 to the construction of a state-of-the- 18 art baseball field, including a 19 grandstand, locker room facilities and 20 a parking lot 1,250,000 21 (iii) Curwensville Borough 22 (A) Infrastructure and other costs related 23 to building the Sunnyside Ethanol 24 Manufacturing Plant 5,000,000 25 (iii.1) Foxburg Borough 26 (A) Community redevelopment relating to 27 public improvements 5,000,000 28 (iii.2) Irvona Borough 29 (A) Acquisition, construction, 30 infrastructure, redevelopment, 20070H1589B4129 - 155 -
1 abatement of hazardous materials and 2 other related costs for the Irvona 3 Brickyard 2,000,000 4 (iv) Karthous Township 5 (A) Construction, infrastructure and other 6 costs associated with the River Hill 7 Power Waste Coal Fired Power Plant 15,000,000 8 (v) Lawrence Township 9 (A) Construction and other related costs 10 for a BioEnergy Ethanol Plant 5,000,000 11 (B) Acquisition, construction, 12 infrastructure and other related costs 13 for Phase II of the Clearfield 14 Firemen's Commerce Park project 5,000,000 15 (VI) UNION TOWNSHIP <-- 16 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 17 RELATED COSTS FOR THE ANDERSON CREEK 18 RESERVOIR 3,500,000 19 (18) Clinton County 20 (i) County projects 21 (A) Acquisition, construction and other 22 related costs for the Beech Creek 23 Watershed project 5,000,000 24 (B) Construction and other related costs 25 for the Annie Halenbake Ross Library 26 and Renovo Library 1,000,000 27 (C) Acquisition, construction, 28 infrastructure and other related costs 29 for the Susquehanna River Corridor 2,000,000 30 (D) Construction, acquisition, 20070H1589B4129 - 156 -
1 redevelopment and other costs related 2 to the Bucktail Medical Center 250,000 3 (E) Construction, infrastructure and other 4 related costs for the Lamar Township 5 Business Park Access Improvement 6 project 7,500,000 7 (ii) City of Lock Haven 8 (A) Construction, infrastructure and other 9 costs associated with the Downtown 10 Streetscape improvement project 1,250,000 11 (B) Construction and other related costs 12 for the First Quality Products 13 Manufacturing Facility 1,000,000 14 (iii) Mill Hall Borough 15 (A) Acquisition, construction and other 16 related costs for Millbrook Playhouse 1,000,000 17 (iii.1) Renovo Borough 18 (A) Improvements to railcar facility at 19 Renovo Industrial Park to enhance 20 production, including utility 21 improvements, rail improvements and 22 building renovation and improvements 3,000,000 23 (iv) Wayne Township 24 (A) Construction and other related costs 25 for Zindel Park development and 26 improvements 500,000 27 (19) Columbia County (Reserved) 28 (20) Crawford County 29 (i) County projects 30 (A) Renovations, rehabilitation and other 20070H1589B4129 - 157 -
1 related costs for the restoration of 2 the historic Tarbell House located in 3 the City of Titusville 500,000 4 (i.1) City of Meadville 5 (A) Infrastructure, construction and other 6 related costs for a Meadville Police 7 indoor shooting range and training 8 facility 2,250,000 9 (B) Construction of the Northwest 10 Pennsylvania Railroad and Tooling 11 Center, including necessary costs 3,000,000 12 (C) Infrastructure, construction and other 13 related costs for the development of 14 the Northwestern Pennsylvania Railroad 15 and Tooling Heritage Center 3,000,000 16 (ii) Vernon Township 17 (A) Acquisition, construction, 18 infrastructure and other related costs 19 for the Crawford County Industrial Park 20 East 2,000,000 21 (iii) Redevelopment Authority of the City of 22 Meadville 23 (A) Redevelopment of the Talon 5 facility 24 for mixed-use development 3,000,000 25 (iv) Titusville Redevelopment Authority 26 (A) Construction, renovation, 27 infrastructure and redevelopment of the 28 Titusville Opportunity Park Keystone 29 Opportunity Zone 2,000,000 30 (21) Cumberland County 20070H1589B4129 - 158 -
1 (i) County projects (Reserved) <--
2 (I) COUNTY PROJECTS <--
3 (A) INFRASTRUCTURE, SITE DEVELOPMENT,
4 CONSTRUCTION, TRANSPORTATION-RELATED
5 IMPROVEMENTS AND OTHER COSTS RELATED TO
6 THE SHIPPENSBURG TOWNSHIP COMMUNITY AND
7 ECONOMIC DEVELOPMENT PROJECT 10,000,000
8 (i.1) Cumberland County Redevelopment
9 Authority
10 (A) Construction and related
11 infrastructure to upgrade the
12 Shippensburg University Athletic
13 Complex 2,500,000
14 (ii) Borough of Carlisle
15 (A) Construction of addition to Bosler
16 Library 2,500,000
17 (B) Acquisition and expansion of Carlisle
18 Central Farmers Market 750,000
19 (C) Infrastructure, construction and
20 rehabilitation of the Central
21 Pennsylvania Youth Ballet Dance
22 Performance Complex at Dickinson
23 College 2,500,000
24 (ii.1) Borough of Lemoyne
25 (A) Infrastructure, construction,
26 rehabilitation and other related costs
27 for the replacement of the community
28 pool 750,000
29 (B) Acquisition, construction,
30 redevelopment and other related costs
20070H1589B4129 - 159 -
1 for Phase 2 of the downtown, 2 redevelopment project, including 3 traffic enhancements, lighting, 4 landscaping and other necessary 5 rehabilitation 5,000,000 6 (C) Acquisition, infrastructure, 7 construction and other related costs 8 for the replacement of the West Shore 9 Bureau of Fire station 1,500,000 10 (iii) Borough of Mechanicsburg 11 (A) Acquisition related to the 12 construction of a new facility for the 13 Mechanicsburg Art Center 1,250,000 14 (iv) Shippensburg Township 15 (A) Infrastructure improvements and 16 construction of Shippensburg Regional 17 Conference Center 3,000,000 18 (v) Silver Spring Township 19 (A) Construction, site preparation and 20 other related costs for a mixed-use 21 development 5,000,000 22 (vi) Upper Allen Township 23 (A) Construction of Rider-Musser mixed-use 24 development operated by Messiah 25 College, including related 26 infrastructure 7,500,000 27 (B) Construction of a regional conference 28 center at Messiah College, including 29 related infrastructure 6,000,000 30 (22) Dauphin County 20070H1589B4129 - 160 -
1 (i) County projects 2 (A) Renovations to the Hershey Memorial 3 Field Complex 1,500,000 4 (B) Construction of an emergency medical 5 facility in Upper Dauphin County, 6 including necessary costs 20,000,000 7 (C) CONSTRUCTION AND OTHER RELATED COSTS <-- 8 FOR DAUPHIN COUNTY BISHOP MCDEVITT 9 REVITALIZATION PROJECT 20,000,000 10 (ii) City of Harrisburg 11 (A) Construction and other related costs 12 for the Pinnacle Health Hospital 13 Emergency Department 5,000,000 14 (B) Construction, infrastructure and other 15 related costs for renovation of the 16 Whitaker Center for Science and the 17 Arts 1,500,000 18 (C) Construction and other costs related 19 to the Pennsylvania Law Enforcement 20 Memorial 1,500,000 21 (D) Construction, equipment, 22 infrastructure and other related costs 23 for renovations to create a psychiatric 24 evaluation unit at the Polyclinic 25 Campus of Pinnacle Health Hospital 9,000,000 26 (E) Construction and renovation of a new 27 Capital Region Health System, Inc., 28 Medical Center 5,000,000 29 (F) Construction and renovation of 30 academic offices, student housing and 20070H1589B4129 - 161 -
1 classrooms in downtown Harrisburg 3,500,000 2 (G) Construction, equipment, 3 infrastructure and other related costs 4 for the Outpatient Cancer Treatment 5 Center at the Community Campus of 6 Pinnacle Health System 13,000,000 7 (iii) Derry Township 8 (A) Acquisition, construction, 9 infrastructure and other related costs 10 for the Hershey Area Master Plan 25,000,000 11 (B) Construction, fit out, renovation, 12 equipment and related costs for the 13 Hershey Center for Applied Research 25,000,000 14 (C) Expansion of bike path, including 15 necessary costs 2,000,000 16 (D) Hershey streetscape project, including 17 necessary costs 3,000,000 18 (iii.1) Hummelstown Borough 19 (A) Renovation of Hummelstown Chemical 20 Fire Company No. 1 facility, including 21 necessary costs 1,500,000 22 (iv) Lower Paxton Township 23 (A) Construction of Heroes Grove, 24 including related infrastructure 4,000,000 25 (B) Construction and development of the 26 Thomas B. George Park 1,000,000 27 (IV.1) LOWER PAXTON AND SWATARA TOWNSHIPS <-- 28 (A) CONSTRUCTION AND OTHER RELATED COSTS 29 FOR LOWER PAXTON AND SWATARA TOWNSHIPS 30 REVITALIZATION CORRIDOR 5,000,000 20070H1589B4129 - 162 -
1 (iv.1) (IV.2) Middletown Borough <--
2 (A) Construction and renovation to
3 Middletown Volunteer Fire Department
4 facility, including necessary costs 2,500,000
5 (v) Middle Paxton Township
6 (A) Construction of a facility to house
7 the Dauphin Middle Paxton Fire Company,
8 including necessary costs 1,500,000
9 (vi) Swatara Township
10 (A) Construction and infrastructure
11 related to the development of Swatara
12 Commons 10,000,000
13 (23) Delaware County
14 (i) County projects
15 (A) Acquisition and other related costs to
16 Tri Borough Fire Company Consolidation 500,000
17 (B) Delaware County Housing Authority,
18 acquisition, infrastructure and
19 construction of the Fairgrounds housing
20 development located near I-95 and the
21 Commodore Barry Bridge on Engle Street 1,500,000
22 (C) Delaware County Redevelopment
23 Authority, acquisition, infrastructure,
24 construction and other related costs
25 for the redevelopment of properties in
26 the Penn Hills area of Ridley Township 2,000,000
27 (D) Infrastructure improvements and
28 renovations to the Nile Swim Club 500,000
29 (E) Acquisition, construction and other
30 costs related to the Delaware County
20070H1589B4129 - 163 -
1 streetscape and infrastructure 2 improvements project 500,000 3 (F) Construction of the new Military 4 College of Pennsylvania on the campus 5 of Valley Forge Military Academy and 6 College 7,000,000 7 (G) Construction of new academic and 8 military training facilities, including 9 repair and replacement of existing 10 infrastructure 7,000,000 11 (H) CONSTRUCTION AND RELATED COSTS FOR THE <-- 12 STEM COMPLEX AT DELAWARE COUNTY 13 COMMUNITY COLLEGE 1,500,000 14 (I) CAPITAL IMPROVEMENTS TO FACILITATE 15 ECONOMIC DEVELOPMENT IN CLIFTON HEIGHTS 16 AND UPPER DARBY 3,000,000 17 (i.1) Brookhaven Borough 18 (A) Construction and other related costs 19 for the Brookhaven Borough Hall energy 20 project 500,000 21 (ii) City of Chester 22 (A) Acquisition, construction, 23 infrastructure and other related costs 24 for the downtown revitalization 5,000,000 25 (B) Chester Economic Development Authority 26 (I) Infrastructure improvements, 27 environmental remediation, bulkhead 28 repairs, site preparation, parking, 29 exhibition space and multipurpose 30 recreational and sports facilities 20070H1589B4129 - 164 -
1 for the Chester Waterfront 45,000,000 2 (II) Infrastructure improvements, 3 bulkhead repairs and site 4 preparation for additional 5 redevelopment of the waterfront 6 area in conjunction with recent 7 housing and commercial 8 redevelopment 18,000,000 9 (III) University Crossing - 10 Development of a commercial mixed- 11 use project with a 48-room hotel 12 and commercial, retail and office 13 space located on inner city lots 14 adjacent to the Widener University 15 campus in the City of Chester 250,000 16 (C) Construction and other related costs 17 for the new Super Market project 2,500,000 18 (D) Construction and other related costs 19 for the Shop Rite Supermarket project 4,000,000 20 (E) INFRASTRUCTURE, CONSTRUCTION AND OTHER <-- 21 RELATED COSTS FOR A REDEVELOPMENT 22 PROJECT ON THE DESHONG TRACT LOCATED ON 23 AVENUE OF THE STATES ON THE EAST SIDE 24 OF INTERSTATE 95 6,000,000 25 (ii.1) Chester Township 26 (A) Site acquisition, redevelopment of 27 existing improvements, construction, 28 infrastructure and related site 29 preparation and equipping for a 30 film/television studio project and 20070H1589B4129 - 165 -
1 related tourist facilities 15,000,000
2 (iii) Clifton Heights
3 (A) Acquisition and construction of
4 municipal service building and property
5 enhancements 3,000,000
6 (III.1) CONCORD TOWNSHIP <--
7 (A) CONSTRUCTION OF THE CONCORD TOWNSHIP
8 CENTER, INCLUDING RENOVATION OF A
9 HISTORIC SCHOOL HOUSE BUILDING 800,000
10 (iii.1) (III.2) Borough of Darby <--
11 (A) Design, development, construction and
12 renovation of new private rooms at
13 Mercy Fitzgerald Hospital 1,538,000
14 (B) CONSTRUCTION OF DARBY TOWN CENTER, <--
15 INCLUDING INFRASTRUCTURE AND OTHER
16 RELATED COSTS 4,500,000
17 (iv) Edgemont Township
18 (A) Construction of a multipurpose,
19 professional indoor equestrian arena 500,000
20 (v) Glenolden Borough
21 (A) Redevelopment and construction related
22 to the revitalization of various
23 borough buildings 500,000
24 (vi) Haverford Township
25 (A) Construction and other related costs
26 for the Haverford Township Community
27 Center 8,000,000
28 (B) Renovations and expansion of the Main
29 Line Art Center 600,000
30 (vi.1) Borough of Media
20070H1589B4129 - 166 -
1 (A) Construction of a new facility for the 2 Historical Pennsylvania Veterans 3 Museum, including land acquisition and 4 the expansion and renovation of 5 existing facilities 3,500,000 6 (B) Renovation, rehabilitation and 7 expansion of the Media Theatre 8 facilities, including construction and 9 land acquisition for ancillary 10 facilities 850,000 11 (C) CONSTRUCTION AND RELATED COSTS FOR <-- 12 BUILDINGS FOR THE ELWYN SCHOOL 1,000,000 13 (vii) Norwood Borough 14 (A) Construction of firehouse and police 15 station, including facility demolition 16 and site preparation 3,000,000 17 (viii) Radnor Township 18 (A) Construction, infrastructure and 19 related costs to renovate Woodcrest 20 Mansion 5,000,000 21 (B) Construction, infrastructure and other 22 related costs for the new Military 23 College of Pennsylvania 7,000,000 24 (C) Infrastructure improvements, 25 construction and related costs for the 26 Center for Performing Arts at Eastern 27 University 5,000,000 28 (ix) Ridley Park Borough 29 (A) Redevelopment and construction related 30 to the revitalization of various 20070H1589B4129 - 167 -
1 borough buildings 1,000,000 2 (B) Infrastructure improvements and 3 construction to Taylor Hospital 2,000,000 4 (x) Ridley Township 5 (A) Construction, infrastructure and other 6 related costs for the Ridley Township 7 Community Center 2,000,000 8 (x.1) Springfield Borough 9 (A) Renovation and expansion of the Burn 10 Treatment Center at Crozer-Keystone 11 Health System 2,000,000 12 (xi) Swarthmore Borough 13 (A) Construction, acquisition, 14 infrastructure and other costs related 15 to the Swarthmore Town Center 16 Development 2,000,000 17 (B) Acquisition, construction, 18 infrastructure and other costs related 19 to the Swarthmore Town Center 20 development project 5,000,000 21 (xi.1) Swarthmore, Rutledge and Morton 22 Boroughs 23 (A) Acquisition of land for the Tri 24 Borough Fire Company consolidation 500,000 25 (XI.2) TINICUM TOWNSHIP <-- 26 (A) CONSTRUCTION OF POLICE FACILITIES, 27 INCLUDING RELATED COSTS 1,000,000 28 (xii) Upper Darby Township 29 (A) Construction of public safety 30 building, including land acquisition 20070H1589B4129 - 168 -
1 and related costs 7,000,000 2 (B) Construction and abatement of 3 hazardous materials related to 4 demolition of 501 Bywood 2,500,000 5 (C) Construction, infrastructure and other 6 costs related to rehabilitation of St. 7 Charles Cemetery 1,000,000 8 (D) Acquisition, rehabilitation and 9 construction of a state-of-the-art 10 public safety building 6,500,000 11 (E) Construction related to the 12 redevelopment of a former warehouse 13 facility, including necessary costs 500,000 14 (xiii) Marcus Hook Borough 15 (A) Acquisition, infrastructure and 16 construction of the Marcus Hook Station 17 Square, a housing and commercial space 18 development, located adjacent to the 19 Marcus Hook train station at the 20 intersection of Market and East 10th 21 Streets in Chester Township 1,000,000 22 (xiv) Marple Township 23 (A) Demolition of the township building 24 and other related costs for the 25 disposal of any environmental hazards 500,000 26 (24) Elk County 27 (i) County projects (Reserved) 28 (ii) City of St. Mary's 29 (A) Impact St. Mary's streetscape and 30 infrastructure improvements, including 20070H1589B4129 - 169 -
1 sidewalks, curbing, streetlights, 2 street trees, lawns and signage to be 3 located along Depot Street and Erie 4 Avenue, replacement of the Iron Run 5 Bridge and extension of Stackpole 6 Street to Washington Street 3,000,000 7 (B) Repair and renovation of the skate 8 park and skate pond, construction of 9 walking paths and upgrading of 10 playground and park equipment at 11 Kaulmont Park 1,000,000 <-- 12 KAULMONT PARK 2,000,000 <-- 13 (iii) St. Mary's Area Economic Development 14 Corporation 15 (A) Construction of a new medical/surgical 16 inpatient floor, including acquisition 17 of equipment and electronic medical 18 records systems for Elk Regional Health 19 Center 7,500,000 20 (25) Erie County 21 (i) County projects 22 (A) Erie-Western Pennsylvania Port 23 Authority 24 (I) Infrastructure and construction of 25 restrooms and a concession building 26 within Liberty Park 1,500,000 27 (II) Infrastructure, rehabilitation, 28 construction and other related 29 costs to repair a deteriorated dock 30 wall at East Dobbins Landing 2,000,000 20070H1589B4129 - 170 -
1 (B) Erie County General Authority 2 (I) Acquisition, infrastructure, 3 construction and other related 4 costs of acquiring and developing a 5 parcel of land for commercial and 6 industrial use 3,000,000 7 (C) Construction, renovations and 8 expansion of the expERIEnce Children's 9 Museum, located in the historic 10 district of downtown Erie 2,000,000 11 (D) CONSTRUCTION AND INFRASTRUCTURE FOR A <-- 12 SONET-BASED FIBER OPTIC 13 TELECOMMUNICATIONS SYSTEM 4,250,000 14 (E) CONSTRUCTION AND OTHER RELATED COSTS 15 FOR A NEW COMMUNITY COLLEGE IN ERIE 16 COUNTY 10,000,000 17 (i.1) City of Corry 18 (A) Acquisition, construction, 19 redevelopment and other related costs 20 for the construction of a new critical 21 access hospital facility 17,500,000 22 (ii) City of Erie 23 (A) Acquisition, construction, 24 infrastructure and other related costs 25 for Downtown Erie revitalization 15,000,000 26 (B) Design, infrastructure and 27 construction of a new pharmacy school 28 at Lake Erie College of Osteopathic 29 Medicine 20,000,000 30 (C) Acquisition, infrastructure, 20070H1589B4129 - 171 -
1 construction, redevelopment and other 2 related costs for upgrades, 3 improvements and enhancements to the 4 Erie Event Complex 25,000,000 5 (D) Construction, infrastructure, 6 redevelopment and other costs related 7 to development of the downtown cultural 8 and entertainment district 25,000,000 9 (E) Redevelopment of SB3 Industrial Park 10 to make park shovel ready for new 11 development, including necessary costs 5,000,000 12 (F) CONSTRUCTION, INFRASTRUCTURE, <-- 13 ABATEMENT OF HAZARDOUS MATERIALS, 14 REDEVELOPMENT AND OTHER RELATED COSTS 15 FOR THE ERIE CITY MISSION PROJECT 6,000,000 16 (G) ACQUISITION, CONSTRUCTION, 17 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 18 RELATED COSTS FOR THE JOHN KANZIUS 19 RADIO WAVE CANCER TREATMENT PROJECT 50,000,000 20 (iii) Harborcreek Township 21 (A) Acquisition, infrastructure, 22 construction and other related costs 23 for the development of a large-scale 24 retail and entertainment complex in the 25 vicinity of Brehand Campus of The 26 Pennsylvania State University 12,000,000 27 (III.1) LAWRENCE PARK TOWNSHIP <-- 28 (A) CONSTRUCTION AND OTHER RELATED COSTS 29 FOR A CLEAN AND EFFICIENT DIESEL TEST 30 FACILITY 8,000,000 20070H1589B4129 - 172 -
1 (iv) Redevelopment Authority of the City of 2 Corry 3 (A) Acquisition, infrastructure, 4 renovations and rehabilitation of five 5 buildings comprising the west side of 6 Center Street between Washington Avenue 7 and Main Street in the City of Corry 8 for the development of multitenant, 9 mixed-use facilities 2,750,000 10 (26) Fayette County 11 (i) County projects 12 (A) Connellsville Airport, construction of 13 runway 5-23 extension 1,000,000 14 (B) Demolition, acquisition, construction 15 and other related costs for the Fay- 16 Penn Industrial Building project 3,000,000 17 (C) Demolition, acquisition, construction 18 and other related costs for the Fayette 19 Institute of Technology 10,000,000 20 (D) Acquisition, infrastructure 21 improvements, construction and other 22 related costs for the Fay-Penn Spec 23 Building project 1,500,000 24 (ii) City of Uniontown 25 (A) Construction and other costs related 26 to the expansion and renovation of 27 Uniontown Hospital 10,000,000 28 (B) Construction, acquisition, 29 redevelopment and other costs related 30 to the downtown Uniontown redevelopment 20070H1589B4129 - 173 -
1 project 1,800,000 2 (iii) Brownsville Borough 3 (A) Acquisition, construction, 4 infrastructure and other related costs 5 for the downtown revitalization 2,000,000 6 (B) Renovations and construction of the 7 Transportation Museum 500,000 8 (iii.1) North Union Township 9 (A) Acquisition, infrastructure 10 improvements and construction for the 11 North Union Township Community Center 3,500,000 12 (B) Eberly Campus, Fayette, construction 13 of annex to community center 750,000 14 (C) Eberly Campus, Fayette, construction 15 of annex to library 875,000 16 (D) Eberly Campus, Fayette, construction 17 of baseball/softball complex 750,000 18 (E) Eberly Campus, Fayette, renovations to 19 the Center for Community and Public 20 Safety office 400,000 21 (F) Eberly Campus, Fayette, construction 22 of residence hall 10,000,000 23 (iv) Perry Township 24 (A) Construction of new township municipal 25 building 1,000,000 26 (V) SOUTH UNION TOWNSHIP <-- 27 (A) CONSTRUCTION, REDEVELOPMENT AND OTHER 28 RELATED COSTS FOR THE UNIONTOWN AREA 29 YMCA EXPANSION 1,000,000 30 (27) Forest County (Reserved) 20070H1589B4129 - 174 -
1 (28) Franklin County 2 (i) County Projects 3 (A) Infrastructure, construction and other 4 related costs related to the 5 construction of a roadway through the 6 Greencastle-Antrim Industrial Park II 1,200,000 7 (B) Construction of track facility at 8 James Buchanan High School, including 9 necessary costs 1,000,000 10 (ii) Greene Township 11 (A) Infrastructure, construction and other <-- 12 related costs for improvements to the 13 intersection of Route 11 and Route 1,200,000 14 (A) INFRASTRUCTURE, CONSTRUCTION AND OTHER <-- 15 RELATED COSTS FOR REDEVELOPMENT RELATED 16 IMPROVEMENTS TO THE INTERSECTION OF 17 ROUTE 11 AND ROUTE 997 1,200,000 18 (iii) Waynesboro Borough 19 (A) Infrastructure, construction and other 20 related costs related to the 21 revitalization of downtown, including 22 the installation of a paver sidewalk 23 along main street 532,000 24 (29) Fulton County 25 (i) County projects 26 (A) Construction of a multitenant building 27 within the Fulton County Business Park 1,000,000 28 (ii) Ayr Township 29 (A) Construction of a multitenant building 30 in Fulton County Business Park, 20070H1589B4129 - 175 -
1 including necessary costs 1,000,000 2 (30) Greene County 3 (i) County projects (Reserved) 4 (ii) Cumberland Township 5 (A) Construction, infrastructure, 6 redevelopment and other costs 7 associated with the Carmichaels Clinic 8 Expansion 500,000 9 (B) Acquisition, infrastructure 10 improvements, construction and other 11 costs related to a tire recycling 12 facility in Paisley Park 6,000,000 13 (iii) Franklin Township 14 (A) Acquisition, construction and related 15 site preparation for the Cornerstone 16 Health Care Center 750,000 17 (B) Construction and other related costs 18 for the Community Aquatic Center 1,000,000 19 (C) Construction and other related costs 20 for the expansions of the addition of 21 Southwest Regional Medical Center 1,500,000 22 (iv) Morgan Township 23 (A) Development, construction and other 24 related costs for completion of the 25 Mather Gob Pile reclamation project 4,500,000 26 (v) Jefferson Township 27 (A) Acquisition, construction, 28 infrastructure and other costs related 29 to the Jefferson Township manufacturing 30 facility 500,000 20070H1589B4129 - 176 -
1 (vi) Perry Township 2 (A) Construction, infrastructure and other 3 related costs for the Meadow Ridge 4 Business Park 3,000,000 5 (vii) Waynesburg Borough 6 (A) Construction, acquisition, 7 infrastructure, redevelopment and other 8 costs associated with Downtown 9 Waynesburg Streetscape improvements 1,000,000 10 (B) Acquisition, construction, 11 infrastructure and other related costs 12 for the Greene County ARC Project 1,000,000 13 (C) Acquisition, construction, 14 infrastructure and other related costs 15 for Waynesburg redevelopment project 2,000,000 16 (D) Acquisition and construction of the 17 Downtown Waynesburg Revitalization 18 Mixed-Use Impact project 5,000,000 19 (31) Huntingdon County 20 (i) County projects (Reserved) 21 (ii) Huntingdon Borough 22 (A) Acquisition, construction and 23 rehabilitation of a train station 24 structure on Allegheny Street in the 25 Huntingdon Borough Historic District 1,103,000 26 (B) Infrastructure, rehabilitation and 27 construction of a new multipurpose 28 community center 1,300,000 29 (C) Acquisition, construction and 30 rehabilitation of several properties 20070H1589B4129 - 177 -
1 located on Allegheny Street in the 2 Huntingdon Borough Historic District 2,000,000 3 (iii) Shirley Township 4 (A) Site preparation and infrastructure 5 for back lot development of Riverview 6 Business and Industrial Park 750,000 7 (B) Infrastructure improvements to the 8 Riverview Business Center 1,100,000 9 (iv) Smithfield Township 10 (A) Land acquisition and site development 11 of a property located east of Giant 12 Food Stores along Route 22 525,000 13 (B) Site preparation and construction of a 14 Shell building facility at the 15 intersection of US 26 US 22 2,000,000 16 (v) Spruce Creek Township 17 (A) Infrastructure, construction and 18 rehabilitation to upgrade facilities at 19 the Union Furnace Quarry 5,000,000 20 (32) Indiana County 21 (i) County projects 22 (A) Renovation of historical covered 23 bridges, including acquisition, 24 construction and other related costs 1,000,000 25 (B) Acquisition, infrastructure, 26 construction and other related costs 27 for the development of a multitenant 28 business facility 4,000,000 29 (C) Acquisition, infrastructure, 30 construction and other related costs 20070H1589B4129 - 178 -
1 for the development of a 2 business/industrial park 5,000,000 3 (D) Land acquisition, remediation, site <-- 4 preparation, infrastructure 5 improvements, construction and other 6 related costs for the redevelopment and 7 revitalization of brownfield sites 8 located along Wayne Avenue and 13th 9 Streets 8,000,000 10 (E) Land acquisition, engineering, site 11 preparation, infrastructure, 12 construction and other related costs 13 for the Vinegar Hill Steps and Water 14 Street Wall project, including required 15 safety improvements to North 7th 16 Street 2,000,000 17 (F) Building improvements, renovations and 18 other related costs for athletic 19 complex improvements at Indiana Area 20 School District schools 1,000,000 21 (G) DEVELOPMENT OF A NEW EMERGENCY <-- 22 SERVICES COMMUNICATIONS SYSTEM, 23 INCLUDING LAND ACQUISITION, SITE 24 DEVELOPMENT AND EQUIPMENT PURCHASES 8,000,000 25 (H) RENOVATION AND CONSTRUCTION OF A 26 PATIENT TOWER AND RELATED FACILITIES, 27 INCLUDING EQUIPMENT ACQUISITION FOR THE 28 INDIANA REGIONAL MEDICAL CENTER 10,000,000 29 (i.1) Blairsville Borough 30 (A) Infrastructure and building 20070H1589B4129 - 179 -
1 improvements, including streetscape and 2 other related costs for downtown 3 redevelopment projects 4,000,000 4 (ii) Burrell Township 5 (A) Land acquisition, site preparation and 6 construction related to development of 7 ambulatory care center at Indiana 8 Regional Medical Center 5,000,000 9 (B) Expansion of the Interchange Center 10 multitenant building, including 11 construction, land acquisition and 12 other related costs 2,000,000 13 (C) Redevelopment of Corporate Campus 14 Business Park, including acquisition, 15 construction, infrastructure and other 16 related costs 3,000,000 17 (iii) Indiana Borough 18 (A) Redevelopment, construction, and 19 infrastructure improvements along 20 Philadelphia Street and 7th Street 5,000,000 21 (iii.1) Homer City 22 (A) Construction, land acquisition and 23 other related costs for Homer-Center 24 Community Center 1,500,000 25 (iv) White Township 26 (A) Expansion of the Indiana Regional 27 Medical Center, including construction 28 and related infrastructure 1,000,000 29 (B) Construction of an agricultural 30 multitenant building, including land 20070H1589B4129 - 180 -
1 acquisition, site preparation and other 2 related costs 3,000,000 3 (C) Redevelopment, construction and 4 infrastructure improvements along Wayne 5 Avenue and 13th Street 4,000,000 6 (D) Renovation of the Mack Park Recreation 7 Complex, including construction, 8 infrastructure and other related costs 3,000,000 9 (E) Acquisition, construction and related 10 infrastructure for the development of 11 the Windy Ridge Business Park 4,000,000 12 (F) Construction of a medical-model 13 wellness center at Indiana Regional 14 Medical Center, including acquisition, 15 infrastructure and other related costs 2,000,000 16 (G) Acquisition, infrastructure, 17 construction and other related costs 18 for the development of a multitenant 19 business facility 2,000,000 20 (v) Center Township 21 (A) Acquisition, infrastructure, 22 construction and other related costs 23 for the development of a multitenant 24 business facility 4,000,000 25 (33) Jefferson County 26 (i) County projects (Reserved) 27 (i.1) Brockway Borough 28 (A) Infrastructure, construction, 29 rehabilitation and other costs related 30 to renovations to the Taylor Memorial 20070H1589B4129 - 181 -
1 Park Swimming Pool, including necessary 2 ADA compliance modifications 550,000 3 (ii) Brookville Borough 4 (A) Patient care improvements, including 5 equipment acquisition for Brookville 6 Hospital 750,000 7 (iii) Jefferson County Development Council, 8 Inc. 9 (A) Jefferson County Enterprise Park II - 10 development of approximately 90 acres 11 of vacant land located near I-80, exit 12 73 for a business park, including land 13 acquisition and water, sewer and 14 roadway infrastructure 1,000,000 15 (iv) North Central Regional Planning and 16 Development Corporation 17 (A) Redevelopment of a 30-acre brownfield 18 site formerly occupied by the Brockway 19 Clay Plant for a business commerce 20 park, including land acquisition, 21 construction of a rail spur and water, 22 sewer and roadway infrastructure 1,000,000 23 (v) Punxsutawney Borough 24 (A) Acquisition and demolition of blighted 25 property for borough redevelopment 500,000 26 (vi) Punxsutawney Regional Development 27 Corporation 28 (A) Riker's yard industrial site - 29 development of 80 acres of vacant land 30 for industrial purposes including land 20070H1589B4129 - 182 -
1 acquisition and water, sewer and 2 roadway infrastructure 1,500,000 3 (B) Facility improvements and upgrades, 4 including the replacement of emergency 5 power generation equipment, information 6 technology necessary to support patient 7 care and safe medication administration 8 at Punxsutawney Area Hospital 600,000 9 (C) Improvement, rehabilitation and 10 renovation of the medical/surgical 11 inpatient unit, including information 12 technology enhancements necessary for a 13 facility-wide transition to electronic 14 health records and patient-focused care 15 philosophy at Punxsutawney Area 16 Hospital 2,500,000 17 (34) Juniata County (Reserved) 18 (35) Lackawanna County 19 (i) County projects 20 (A) Construction of North Pocono Area 21 Community Center 2,000,000 22 (B) Land acquisition, infrastructure 23 improvements and construction of 24 recreational and athletic field 25 facilities along Route 6, Lackawanna 26 College 3,000,000 27 (C) Construction and other related costs 28 for additional improvements to Archbald 29 Pothole State Park 1,500,000 30 (D) Acquisition, construction and other 20070H1589B4129 - 183 -
1 costs related to a new trail along the 2 Lackawanna River 3,000,000 3 (E) Construction and other costs related 4 to building a Keystone College computer 5 and business building 7,000,000 6 (i.1) Archbald Borough 7 (A) Construction, renovations and 8 expansion to the Northeastern 9 Educational Intermediate Unit building 2,000,000 10 (I.2) CITY OF CARBONDALE <-- 11 (A) ACQUISITION, INFRASTRUCTURE 12 IMPROVEMENTS AND OTHER COSTS RELATED TO 13 THE CONSTRUCTION OF THE ANTHRACITE 14 HISTORICAL DISCOVERY CENTER 2,000,000 15 (i.2) (I.3) Clarks Green Borough, Clarks <-- 16 Summit Borough, Glenburn Township and South 17 Abington Township 18 (A) Infrastructure improvements and 19 construction of the Abington Area 20 Community Park 8,344,000 21 (i.3) (I.4) Covington Township <-- 22 (A) Construction, redevelopment and other 23 related costs for the North Pocono High 24 School Health and Wellness Center 4,000,000 25 (ii) Dunmore Borough 26 (A) Construction and other costs related 27 to building the Dunmore Fire Station 1,400,000 28 (B) Construction, infrastructure, 29 redevelopment and other costs related 30 to building the Dunmore High School 20070H1589B4129 - 184 -
1 Health and Fitness Center 1,000,000 2 (ii.1) Jessup Borough 3 (A) Construction of technology facility 4 building within the Jessup Small 5 Business Center/Valley View Business 6 Park 2,750,000 7 (ii.2) Moosic Borough 8 (A) Acquisition, infrastructure 9 improvements, developments and 10 construction of Lackawanna County 11 Baseball Stadium and adjacent property 35,000,000 12 (ii.3) Old Forge Borough 13 (A) Construction, redevelopment and other 14 related costs for Old Forge Community 15 Center and Park improvements 2,000,000 16 (ii.4) Scott Township 17 (A) Construction, redevelopment and other 18 related costs for the Lakeland High 19 School Health and Wellness Center 2,000,000 20 (iii) City of Scranton 21 (A) Acquisition and other costs related to 22 providing the Vocational Services 23 Community Employment Program and 24 Sheltered Workshop 1,000,000 25 (B) Construction, infrastructure, 26 redevelopment and other costs related 27 to the West Scranton Revitalization 28 Project 3,000,000 29 (C) Construction, redevelopment and other 30 costs related to the Nay Aug Zoo 20070H1589B4129 - 185 -
1 renovation and addition 10,000,000 2 (D) Construction for the expansion of 3 Johnson College 1,985,000 4 (E) Infrastructure improvements and 5 construction of the Marywood University 6 athletic field facility 1,000,000 7 (F) Acquisition, infrastructure 8 improvements and construction of a 9 parking garage for the Commonwealth 10 Medical College 10,000,000 11 (G) Acquisition and construction for film 12 production facility 6,000,000 13 (H) Acquisition, infrastructure 14 improvements and construction of 15 Scranton Public Library 7,500,000 16 (I) Acquisition, infrastructure 17 improvements, construction and related 18 costs for a new science center and 19 academic facilities for the University 20 of Scranton 37,500,000 21 (J) Acquisition, infrastructure 22 improvements, construction and related 23 costs for an athletic complex and 24 related facilities for the University 25 of Scranton 10,000,000 26 (K) Acquisition, infrastructure 27 improvements, construction and related 28 costs for the Mulberry Street 29 improvement project at the University 30 of Scranton 1,500,000 20070H1589B4129 - 186 -
1 (L) Construction, redevelopment and other 2 costs related to the refurbishment of 3 the Lackawanna County Courthouse 7,000,000 4 (M) Acquisition, infrastructure 5 improvements, construction and other 6 costs related to the Technology Office 7 Building project in the Mount Pleasant <-- 8 Corporation Center 4,000,000 9 BUILDING PROJECT 4,000,000 <-- 10 (N) Acquisition, infrastructure 11 improvements, construction and other 12 costs related to the Timmy's Town 13 Center Children's Museum project 5,000,000 14 (O) CONSTRUCTION OF THE FRIENDSHIP HOUSE <-- 15 AUTISM TREATMENT FACILITY 1,400,000 16 (P) CONSTRUCTION AND OTHER RELATED COSTS 17 TO REBUILD FACILITIES AT SCRANTON'S 18 FARMER'S MARKET AND ALBRIGHT AVENUE 1,500,000 19 (iv) South Abington Township 20 (A) Acquisition, redevelopment and costs 21 associated with building the South 22 Abington Township Community Center 1,200,000 23 (v) Throop Borough 24 (A) Construction, redevelopment and other 25 costs related to renovation of Throop 26 Hose Company No. 3 1,000,000 <-- 27 HOSE COMPANY NO. 3 2,000,000 <-- 28 (B) Construction, acquisition and other 29 costs related to building Throop Hose <-- 30 Company No. 2 1,260,000 20070H1589B4129 - 187 -
1 THROOP BOROUGH BUILDING RENOVATIONS AND <-- 2 ADDITIONS 1,260,000 3 (36) Lancaster County 4 (i) County projects 5 (A) Acquisition, infrastructure, 6 renovations, construction and other 7 related costs for the development of a 8 community health center at Lancaster 9 General Hospital 2,500,000 10 (B) Acquisition, infrastructure, 11 renovations, construction and other 12 related costs for the Historic 13 Preservation Trust of Lancaster County 14 for the Stevens-Smith Historic Site 15 project 6,000,000 16 (C) Design, infrastructure, construction 17 and other related costs for the 18 development of a Campus of History for 19 the Lancaster County Historical 20 Society 9,000,000 21 (D) Acquisition, design, infrastructure, 22 construction and other related costs of 23 building a new facility, including a 24 planetarium and exhibits at the North 25 Museum of Natural History and Science 3,000,000 26 (E) Site preparation, infrastructure, 27 construction and other related costs 28 for the Crossings at Conestoga Creek 29 project, including construction of an 30 innovative storm water management and 20070H1589B4129 - 188 -
1 wetland enhancement facility 10,000,000 2 (F) Additional funds for the completion of 3 the redevelopment of the historic Watt 4 & Shand Department Store as part of the 5 Lancaster County Convention 6 Center/Hotel project 6,000,000 7 (G) Acquisition, construction, 8 infrastructure and other related costs 9 to renovate outdoor recreation 10 facilities 5,000,000 11 (H) ACQUISITION, CONSTRUCTION, <-- 12 INFRASTRUCTURE AND OTHER RELATED COSTS 13 FOR NEW COUNTY JAIL 25,000,000 14 (I) ACQUISITION, CONSTRUCTION, 15 INFRASTRUCTURE AND OTHER RELATED COSTS 16 FOR A CHILDREN AND YOUTH FACILITY 5,000,000 17 (J) CONSTRUCTION, INFRASTRUCTURE AND OTHER 18 RELATED COSTS TO RENOVATE COUNTY OFFICE 19 BUILDINGS, INCLUDING THE 40 EAST KING 20 STREET FACILITY 10,000,000 21 (K) CONSTRUCTION, INFRASTRUCTURE AND OTHER 22 RELATED COSTS TO RENOVATE THE COUNTY 23 COURTHOUSE AND RESTORE THE OLD COUNTY 24 COURTHOUSE 10,000,000 25 (L) ACQUISITION, CONSTRUCTION, 26 INFRASTRUCTURE AND OTHER RELATED COSTS 27 FOR A NEW FORENSIC CENTER 5,000,000 28 (M) CONSTRUCTION AND RELATED COSTS FOR THE 29 CONESTOGA VALLEY SCHOOL DISTRICT 30 ENVIRONMENTAL CENTER 1,000,000 20070H1589B4129 - 189 -
1 (ii) City of Lancaster
2 (A) Construction and other related costs
3 for the Thaddeus Stevens Technology
4 Center 4,000,000
5 (B) Infrastructure and other costs
6 associated with Lancaster wireless
7 access 1,000,000
8 (C) Infrastructure and equipment to
9 support a network of public safety
10 surveillance cameras throughout the
11 City of Lancaster for the Lancaster
12 Community Safety Coalition 600,000
13 (D) Construction, infrastructure and other
14 related costs to expand, improve and
15 update facilities at the Lancaster
16 Public Library 3,500,000
17 (E) Acquisition, infrastructure,
18 demolition and other related costs for
19 the construction of a new facility
20 located within the James Street
21 Improvement District for the Lancaster
22 YMCA 6,000,000
23 (F) Redevelopment Authority of the City of
24 Lancaster, for restoration of the
25 historic Montgomery House located in
26 downtown Lancaster 1,250,000
27 (G) Acquisition, construction and other
28 related costs for the Lancaster County
29 Performing Arts Center project 15,000,000
30 (H) Acquisition, construction, <--
20070H1589B4129 - 190 -
1 infrastructure and other related costs 2 for new county jail 25,000,000 3 (I) Acquisition, construction, 4 infrastructure and other related costs 5 for a children and youth facility 5,000,000 6 (J) Construction, infrastructure and other 7 related costs to renovate county office 8 buildings, including the 40 East King 9 Street facility 10,000,000 10 (K) Construction, infrastructure and other 11 related costs to renovate the county 12 courthouse and restore the old county 13 courthouse 10,000,000 14 (L) Acquisition, construction, 15 infrastructure and other related costs 16 for a new forensic center 5,000,000 17 (M) (H) Acquisition, renovation and <-- 18 rehabilitation of a former warehouse 19 facility for Manos House, a nonprofit 20 Drug and Alcohol Rehabilitation 21 Services organization, for reuse as a 22 residential drug and alcohol 23 rehabilitation program and independent 24 living facility 1,000,000 25 (I) CONSTRUCTION AND OTHER RELATED COSTS <-- 26 FOR THE CONESTOGA PLAZA PROJECT 5,000,000 27 (J) ACQUISITION, DEMOLITION, CONSTRUCTION, 28 ENVIRONMENTAL REMEDIATION, 29 INFRASTRUCTURE AND OTHER RELATED COSTS 30 FOR THE NORTHWEST GATEWAY DEVELOPMENT 20070H1589B4129 - 191 -
1 PROJECT, INCLUDING HEALTH CARE 2 FACILITIES AND RAILROAD RELOCATION 3 COSTS 20,000,000 4 (K) CONSTRUCTION AND OTHER RELATED COSTS 5 FOR THE PENNSYLVANIA ACADEMY OF MUSIC 6 IMPROVEMENTS 15,000,000 7 (L) ACQUISITION, INFRASTRUCTURE, 8 CONSTRUCTION AND OTHER RELATED COSTS 9 FOR THE DEVELOPMENT OF A TRANSIT 10 REVITALIZATION INVESTMENT DISTRICT IN 11 THE VICINITY OF THE LANCASTER TRAIN 12 STATION 15,000,000 13 (iii) Columbia Borough 14 (A) Acquisition and renovation of Center 15 for Brain Injured Children at the 16 Lazarus Foundation 913,000 17 (B) Acquisition, infrastructure, 18 rehabilitation and construction of the 19 Columbia Fireman's Museum, an 20 interactive firehouse museum 4,625,000 21 (C) ACQUISITION, INFRASTRUCTURE, SITE <-- 22 DEVELOPMENT, CONSTRUCTION AND OTHER 23 COSTS FOR THE RENOVATION AND 24 DEVELOPMENT OF THE FORMER ASHLEY AND 25 BAILEY SILK COMPANY SILK MILLS PROPERTY 26 LOCATED AT THE INTERSECTION OF NORTH 27 4TH STREET AND LINDEN STREET 1,000,000 28 (III.1) ELIZABETHTOWN BOROUGH 29 (A) SITE DEVELOPMENT, INFRASTRUCTURE 30 IMPROVEMENTS, CONSTRUCTION AND 20070H1589B4129 - 192 -
1 RENOVATION OF ATHLETIC FACILITIES AT 2 ELIZABETHTOWN COLLEGE 3,000,000 3 (B) SITE DEVELOPMENT, INFRASTRUCTURE 4 IMPROVEMENTS, CONSTRUCTION AND 5 RENOVATION OF AN INSTRUCTIONAL 6 CLASSROOM BUILDING FOR ELIZABETHTOWN 7 COLLEGE 3,000,000 8 (C) SITE DEVELOPMENT, INFRASTRUCTURE 9 IMPROVEMENTS, CONSTRUCTION AND 10 RECONSTRUCTION OF A WEIR AT 11 ELIZABETHTOWN COLLEGE 1,500,000 12 (iv) Ephrata Borough 13 (A) Redevelopment of Mountain Springs 14 Hotel property, including related 15 infrastructure 500,000 16 (v) Ephrata Township 17 (A) Infrastructure, construction and other 18 related costs of converting 50.8 acres 19 of land into a community recreational 20 park 1,530,000 21 (vi) New Holland Borough 22 (A) Redevelopment of historic building on 23 Main Street, including related 24 infrastructure 500,000 25 (B) Acquisition, infrastructure, 26 development and construction on an East 27 Main Street vacant parcel for the New 28 Holland Farmers Fair Association 29 Exhibit Hall project 600,000 30 (vii) East Cocalico Township 20070H1589B4129 - 193 -
1 (A) Acquisition, infrastructure, 2 rehabilitation and construction of a 3 community center on North Reading Road 4,000,000 4 (viii) East Lampeter Township 5 (A) Infrastructure, construction and other 6 related costs for improvements to the 7 Strasburg Pike frontage of the Flory 8 Park development project 500,000 9 (ix) Honey Brook Township 10 (A) Acquisition, infrastructure and 11 construction of a new municipal 12 building 1,850,000 13 (x) Manheim Borough 14 (A) Renovations to the Manheim Borough 15 office building, consisting of 16 construction of handicap accessibility 1,300,000 17 (xi) Mount Joy Borough 18 (A) Infrastructure, rehabilitation and 19 construction of a satellite branch YMCA 20 facility 4,000,000 21 (xii) Warwick Township 22 (A) Acquisition, infrastructure, 23 rehabilitation, construction and other 24 related costs of converting 5.5 miles 25 of the former Reading and Columbia 26 Railroad corridor into a linear trail 875,000 27 (B) Rehabilitation and expansion of the 28 Lititz Recreational Center 700,000 29 (37) Lawrence County 30 (i) County projects 20070H1589B4129 - 194 -
1 (A) Construction, acquisition, 2 infrastructure, redevelopment and other 3 costs related to the Lawrence County 4 South Central Route 18 Development 5 District 12,000,000 6 (B) Construction, acquisition, 7 infrastructure, redevelopment and other 8 costs related to the Central Lawrence 9 County Route 422 Corridor Development 10 Area 8,000,000 11 (i.1) Ellwood Borough 12 (A) Acquisition, demolition, 13 infrastructure improvements, 14 construction and other costs related to 15 the Ellwood Borough Downtown 16 Revitalization project 10,000,000 17 (ii) Elwood City Borough 18 (A) Acquisition, construction, 19 infrastructure and other related costs 20 for the Ellwood Borough East Commerce 21 Park 10,000,000 22 (B) Construction, infrastructure and other 23 costs related to school and community 24 athletic facilities improvements 1,000,000 25 (C) Acquisition, construction, 26 infrastructure, redevelopment and other 27 costs related to Ellwood City 28 Revitalization and Economic Development 29 project 4,000,000 30 (ii.1) City of New Castle 20070H1589B4129 - 195 -
1 (A) Acquisition, infrastructure 2 improvements and construction for the 3 Downtown Revitalization project 10,000,000 4 (iii) New Wilmington Borough 5 (A) Acquisition, construction, 6 infrastructure and other costs related 7 to the rehabilitation of downtown New 8 Wilmington 1,500,000 9 (iv) Shenango Township 10 (A) Acquisition, demolition, 11 infrastructure improvements, 12 construction and other costs related to 13 the Big Run Commerce Park project 5,000,000 14 (v) Wampum Borough 15 (A) Construction, infrastructure and other 16 costs related to Wampum Borough 17 downtown improvements and 18 revitalization 1,000,000 19 (38) Lebanon County 20 (i) County projects (Reserved) 21 (ii) City of Lebanon 22 (A) Acquisition, construction, 23 infrastructure and other related costs 24 for downtown urban corridor 25 revitalization 10,000,000 26 (iii) South Lebanon Township 27 (A) Redevelopment of police department 28 facilities, including construction and 29 related infrastructure 565,000 30 (39) Lehigh County 20070H1589B4129 - 196 -
1 (i) County projects 2 (A) Infrastructure, design and other 3 related costs to the transitioning to a 4 high-performance emergency services 5 program 5,000,000 6 (B) Lehigh Valley Economic Development 7 Corporation 8 (I) Infrastructure and rehabilitation 9 of an assistive technology 10 incubator center 7,000,000 11 (II) Infrastructure, construction and 12 rehabilitation of the downtown 13 Americus Center 15,000,000 14 (C) Infrastructure, construction and other 15 related costs of a waterfront 16 development on Front Street between 17 Bucky Boyle Park and the Transportation 18 Museum 28,000,000 19 (D) Acquisition and renovations of a 20 facility to be used as a therapeutic 21 community dedicated to providing 22 addiction and mental health treatment 23 for veterans 1,250,000 24 (E) Land acquisition, infrastructure 25 improvements and construction necessary 26 to maintain the competitive position of 27 an existing business entity or for the 28 development of business-ready sites for 29 potential business tenants 1,000,000 30 (F) Rehabilitation and redevelopment of a 20070H1589B4129 - 197 -
1 building for the purposes of an 2 Association for Blind and Visually 3 Impaired program expansion to fully 4 integrate a one-stop low vision center, 5 a fully equipped aids and devices store 6 and a state-of-the-art technology 7 center 725,000 8 (ii) City of Allentown 9 (A) Construction, redevelopment and other 10 costs associated with expansion and 11 renovation of Lehigh Valley Hospital 1,000,000 12 (B) Acquisition, redevelopment, 13 streetscape improvement and other costs 14 related to the 7th Street Property 15 Acquisition and Beautification Project 3,000,000 16 (C) Acquisition, redevelopment and other 17 costs related to the Americus Design 18 Center 5,000,000 19 (D) Acquisition, redevelopment and other 20 costs associated with building the 21 Allentown Conference/Convention Center 5,000,000 22 (E) Acquisition, park land reclamation and 23 other costs related to the St. Elmo 24 Park Development 3,000,000 25 (F) Acquisition, redevelopment and other 26 costs associated with the Performing 27 and Visual Arts Center 7,000,000 28 (G) Demolition of Sals Restaurant and 29 construction of a new upscale 30 restaurant 500,000 20070H1589B4129 - 198 -
1 (H) Acquisition, infrastructure, 2 renovation and redevelopment of several 3 properties in Old Allentown into artist 4 lofts 500,000 5 (I) Acquisition of land and construction 6 of a park on a St. Elmo Street lot 500,000 7 (J) Construction, renovations and 8 redevelopment of the former Schoens 9 Furniture store into Class A offices, 10 retail and lofts 1,000,000 11 (K) Acquisition, infrastructure, 12 renovations and redevelopment for the 13 purposes of creating a downtown 14 cultural arts district 1,000,000 15 (L) Acquisition, infrastructure, 16 renovations and redevelopment of the 17 7th Street Commercial Corridor 1,000,000 18 (M) Acquisition, infrastructure, 19 redevelopment and construction of 20 homeownership units located within the 21 historic Old Allentown neighborhood 1,000,000 22 (N) Acquisition, infrastructure, 23 demolition, renovations and 24 redevelopment of buildings around new 25 museum and creation of river walk and 26 marina at Lehigh Landing, Phase II 1,500,000 27 (O) Acquisition, infrastructure, 28 renovation and redevelopment of 26 29 acres located on the Lehigh Structural 30 Steel site for mixed-use purposes for 20070H1589B4129 - 199 -
1 Waterfront Commons, Phase I 2,000,000 2 (P) Acquisition, infrastructure, 3 construction and redevelopment of the 4 Hanover Acres site and properties along 5 Hanover Street for Overlook Park, Phase 6 II 2,000,000 7 (Q) Infrastructure, renovation and 8 redevelopment of key downtown 9 neighborhoods for Old Allentown 10 neighborhood revitalization project 2,000,000 11 (R) Acquisition, construction and other 12 related costs to redevelop the 13 Fairgrounds Farmers Market and 19th 14 Street 2,000,000 15 (S) Construction, infrastructure and other 16 related costs to develop the citywide 17 security camera and shot spotter 18 program to improve safety and increase 19 economic development 2,000,000 20 (T) Acquisition and redevelopment of a 26- 21 acre urban brownfield site into a 22 waterfront community 2,500,000 23 (U) Infrastructure, construction and 24 redevelopment of the Lehigh Landing 25 office development for Lehigh Landing, 26 Phase I 2,500,000 27 (V) Construction and renovations to the 28 historic Civic Theatre 5,000,000 29 (W) Construction, renovations and 30 redevelopment of the Americus Hotel 20070H1589B4129 - 200 -
1 into a mixed-use facility 5,000,000 2 (X) Infrastructure, construction and 3 redevelopment of vacant parking lots 4 and underutilized buildings along 7th 5 Street in downtown Allentown 5,000,000 6 (Y) Acquisition, infrastructure, 7 renovation and redevelopment of the 8 Downtown Post Office to a state-of-the- 9 art visual arts center 7,000,000 10 (Z) Acquisition, infrastructure, 11 renovations and redevelopment of a new 12 downtown executive conference center 13 next to Crowne Plaza 7,000,000 14 (AA) Infrastructure, construction and 15 other related costs for the Allentown 16 Symphony Hall improvements project, 17 including the construction of a 18 performing arts center 1,250,000 19 (BB) Acquisition, infrastructure, 20 construction, redevelopment and other 21 related costs for the relocation of the 22 Casa Guadalupe Center 500,000 23 (CC) INFRASTRUCTURE, REDEVELOPMENT AND <-- 24 OTHER COSTS RELATED TO OLD ALLENTOWN 25 STREETSCAPE IMPROVEMENTS 2,000,000 26 (DD) ACQUISITION, CONSTRUCTION, 27 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 28 RELATED COSTS FOR THE CASA EXPANSION 29 PROJECT 3,000,000 30 (EE) ACQUISITION, CONSTRUCTION, 20070H1589B4129 - 201 -
1 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 2 COSTS RELATED TO THE LEHIGH VALLEY 3 CHARTER SCHOOL FOR PERFORMING ARTS 5,000,000 4 (FF) ACQUISITION, CONSTRUCTION, 5 INFRASTRUCTURE AND OTHER COSTS RELATED 6 TO THE EXPANSION OF THE POLICE ACADEMY 5,000,000 7 (GG) ACQUISITION, CONSTRUCTION, 8 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 9 RELATED COSTS FOR THE EXPANSION OF THE 10 CENTRAL CATHOLIC HIGH SCHOOL AND 11 NURSING SCHOOL PROJECT 10,000,000 12 (HH) CONSTRUCTION, INFRASTRUCTURE, 13 REDEVELOPMENT AND OTHER RELATED COSTS 14 FOR THE LEHIGH VALLEY MULTIPURPOSE 15 COMMUNITY ARENA 40,000,000 16 (II) CONSTRUCTION AND OTHER RELATED COSTS 17 FOR RENOVATION OF EXISTING COMMERCIAL 18 SPACE FOR A RESTAURANT 2,000,000 19 (iii) City of Bethlehem 20 (A) Construction and other related costs 21 for the renovation and expansion of the 22 Lehigh Valley Hospital-Muhlenberg 5,000,000 23 (B) Acquisition, infrastructure 24 improvements, renovations and 25 construction of Martin Tower, former 26 world headquarters of Bethlehem Steel 10,000,000 27 (iii.1) Catasauqua Borough 28 (A) Construction of emergency services 29 building 1,600,000 30 (iv) Emmaus Borough 20070H1589B4129 - 202 -
1 (A) Construction and acquisition of Emmaus 2 Main Street Parking Deck 5,000,000 3 (B) Construction and acquisition of Emmaus 4 Main Street Community Center 3,000,000 5 (C) Triangle Project, Phase II, 6 redevelopment of downtown, including 7 necessary costs 500,000 8 (v) Lower Macungie Township 9 (A) Acquisition, construction, 10 infrastructure and other related costs 11 for a new Lower Macungie Fire 12 Department Fire Station 2,000,000 13 (V.1) UPPER MACUNGIE TOWNSHIP <-- 14 (A) CONSTRUCTION AND RELATED COSTS FOR THE 15 CYCLING HALL OF FAME AND MUSEUM 5,000,000 16 (v.1) (V.2) Macungie Borough <-- 17 (A) Acquisition of land adjacent to 18 Macungie Memorial Park across Swabin 19 Creek, with construction and 20 installation of a first bridge across 21 the creek and recreational equipment 22 improvement 800,000 23 (v.2) (V.3) North Whitehall Township <-- 24 (A) Construction of four athletic fields 2,200,000 25 (B) Acquisition, infrastructure 26 improvements, renovations and 27 construction of Camp Fowler 3,000,000 28 (vi) Salisbury Township 29 (A) Acquisition, construction, 30 infrastructure and other related costs 20070H1589B4129 - 203 -
1 for the Emergency Department and 2 Imaging Department expansion at Lehigh 3 Valley Hospital and Health Network 5,300,000 4 (vi.1) Slatington Borough 5 (A) Acquisition, construction, 6 infrastructure and other related costs 7 for a Main Street Park 285,000 8 (vii) Upper Saucon Township 9 (A) Construction, infrastructure and 10 related costs for the Gambet Center for 11 Innovation and Global Competitiveness 4,000,000 12 (B) Construction of a baseball stadium at 13 DeSales University 1,750,000 14 (C) Construction of the McShea Student 15 Union Center at DeSales University 7,500,000 16 (viii) North Whitehall Township 17 (A) Construction and redevelopment of four 18 state-of-the-art athletic fields for 19 use by Lehigh Carbon Community College 20 students and community youth groups 2,112,000 21 (40) Luzerne County 22 (i) County projects 23 (A) Acquisition, infrastructure, 24 construction and other related costs 25 for the development of The Lands at 26 Hillside Farms, a multitenant, mixed- 27 use community located in Jackson and 28 Kingston Townships 4,000,000 29 (ii) Ashley Borough 30 (A) Construction, infrastructure and other 20070H1589B4129 - 204 -
1 related costs for the Ashley Lane 2 Project 500,000 3 (B) Acquisition, construction and other 4 related costs for the Mill Street Mill 5 Project 500,000 6 (ii.1) Butler Township and Conyngham Borough 7 (A) Acquisition, construction, 8 redevelopment and other related costs 9 for the Valley Regional Fire and Rescue 10 Firehouse 500,000 11 (iii) City of Nanticoke 12 (A) Acquisition, construction, 13 infrastructure and other related costs 14 for mixed-use development on East Main 15 Street 1,000,000 16 (B) Construction, infrastructure and other 17 related costs for the Luzerne County 18 Community College Public Safety 19 Institute 35,447,000 20 (C) Construction and other related costs 21 for downtown parking expansion 2,000,000 22 (D) Acquisition, construction, 23 infrastructure and other related costs 24 for Luzerne County Community College 25 student housing 2,000,000 26 (E) Construction, infrastructure, 27 redevelopment and other costs related 28 to new housing at Susquehanna Coal 29 Building 500,000 30 (F) Acquisition, construction and other 20070H1589B4129 - 205 -
1 related costs for the Lower Broadway 2 Park multi-use project 1,000,000 3 (G) Acquisition, construction, 4 infrastructure and other related costs 5 for the Luzerne County Community 6 College Culinary Arts Building with 7 parking 3,000,000 8 (H) Construction and related costs for the 9 Kanjorski Building Health Sciences 10 Center at Luzerne Community College 2,352,000 11 (iv) City of Wilkes-Barre 12 (A) Acquisition, construction, 13 infrastructure and other related costs 14 for the revitalization of the 100 block 15 of South Main Street 13,000,000 16 (B) Construction, infrastructure and other 17 related costs for the renovation of the 18 public square 1,500,000 19 (C) Construction, infrastructure and other 20 related costs for the redevelopment of 21 the Kirby Park recreation area 750,000 22 (D) Construction, infrastructure, 23 redevelopment, abatement of hazardous 24 materials and other costs related to 25 building the Irem Temple Mosque 10,000,000 26 (E) Construction, infrastructure, 27 abatement of hazardous materials and 28 other costs related to Impact Wilkes- 29 Barre 5,000,000 30 (F) Construction, infrastructure, 20070H1589B4129 - 206 -
1 acquisition, abatement of hazardous 2 materials, redevelopment and other 3 costs related to Impact Wilkes-Barre 3,000,000 4 (G) Construction, infrastructure, 5 acquisition, abatement of hazardous 6 materials, redevelopment and other 7 costs relates to Downtown Wilkes-Barre 8 Revitalization Phase II 15,000,000 9 (H) Construction, acquisition, 10 infrastructure, redevelopment, 11 abatement of hazardous materials and 12 other costs related to Hanover 13 Industrial Estates 1,000,000 14 (I) Acquisition, construction, 15 infrastructure and other related costs 16 for a mixed-use facility at the Murray 17 Complex 10,000,000 18 (J) Construction, infrastructure and other 19 related costs for the Coal Street Park 20 Office Complex 7,000,000 21 (K) Acquisition, construction, 22 infrastructure and other related costs 23 for an intermodal transportation 24 facility 4,000,000 25 (L) Construction, infrastructure and other 26 related costs for the Coal Street Park 27 Regional Sports Complex 8,000,000 28 (M) Construction and other related costs 29 for the redevelopment of the Murray 30 Courtwright Complex 5,000,000 20070H1589B4129 - 207 -
1 (N) Construction, acquisition, 2 infrastructure, redevelopment, 3 abatement of hazardous materials and 4 other associated with the West Market 5 Street Mixed-Use Revitalization 6 Project 5,000,000 7 (O) Construction, infrastructure 8 improvements, abatement of hazardous 9 materials and construction for parking 10 facilities in downtown Wilkes-Barre 5,000,000 11 (P) ACQUISITION, DEMOLITION, CONSTRUCTION, <-- 12 INFRASTRUCTURE AND OTHER RELATED COSTS 13 FOR A MIXED-USE PROJECT AT NORTH MAIN 14 AND NORTH STREETS 5,000,000 15 (Q) ACQUISITION, INFRASTRUCTURE 16 IMPROVEMENTS, CONSTRUCTION AND OTHER 17 RELATED COSTS FOR THE NORTH BRANCH 18 LIBRARY OF THE OSTERHOUT FREE LIBRARY 19 PROJECT 1,500,000 20 (R) CONSTRUCTION, INFRASTRUCTURE AND 21 REDEVELOPMENT FOR THE MARKET STREET 22 SQUARE TRAIN STATION 3,500,000 23 (S) ACQUISITION, CONSTRUCTION, 24 INFRASTRUCTURE AND OTHER RELATED COSTS 25 FOR THE WILKES UNIVERSITY LAW SCHOOL 10,000,000 26 (iv.1) Dallas Borough 27 (A) Acquisition, construction, 28 infrastructure and other costs related 29 to the expansion of Back Mountain 30 Cultural Arts Center 500,000 20070H1589B4129 - 208 -
1 (B) Acquisition, infrastructure, 2 construction, renovations and other 3 related costs for a health science 4 facility at Misericordia University 2,750,000 5 (iv.2) Dallas Township 6 (A) Infrastructure, rehabilitation and 7 construction of a multicommunity indoor 8 athletic facility 500,000 9 (B) Acquisition, infrastructure, 10 construction and other related costs 11 for a community recreation and athletic 12 facility 500,000 13 (v) Hanover Township 14 (A) Construction, acquisition, 15 infrastructure, redevelopment and other 16 costs related to Hanover Crossings 17 Phase III and IV 4,000,000 18 (vi) Hazle Township 19 (A) Acquisition, construction, 20 infrastructure and other related costs 21 for the development of a cargo airport 250,000,000 22 (B) ACQUISITION, CONSTRUCTION, <-- 23 INFRASTRUCTURE AND OTHER COSTS RELATED 24 TO THE ROUTE 424 EXTENSION PROJECT 5,000,000 25 (vi.1) City of Hazleton 26 (A) Construction, infrastructure and other 27 costs related to the Hazleton 28 Elementary-Middle School Castle 29 Auditorium 1,000,000 30 (vii) Kingston Borough 20070H1589B4129 - 209 -
1 (A) Construction and other related costs 2 for the Hoyt Library Construction 3 Project 1,500,000 4 (B) Renovation, construction, 5 infrastructure and related costs for 6 elementary, middle and high school 7 projects for Wyoming Valley West School 8 District 46,500,000 9 (C) Infrastructure, construction, 10 renovations and other related costs for 11 improvements to the Wyoming Seminary 12 campus 1,450,000 13 (viii) Lehman Township 14 (A) Infrastructure, rehabilitation and 15 construction of a multicommunity indoor 16 athletic facility 500,000 17 (B) Infrastructure, construction and other 18 related costs for an indoor community 19 health center and recreation and 20 athletic facility 500,000 21 (ix) Plains Township 22 (A) Birchwood Park improvement project 319,000 23 (x) Pittston 24 (A) Infrastructure improvements and 25 construction for Center Point East 26 Phase III project 7,900,000 27 (B) Infrastructure improvements and 28 construction for Center Point South 29 project 2,400,000 30 (C) Infrastructure improvements and 20070H1589B4129 - 210 -
1 construction for Center Point West 2 project 3,850,000 3 (D) Acquisition, demolition, 4 infrastructure, construction and 5 related costs for the Downtown Pittston 6 redevelopment project 10,000,000 7 (E) Construction and infrastructure for 8 security control center for Pittston 9 Area School District 635,000 10 (F) Acquisition and construction for the 11 Northeastern Pennsylvania Regional 12 Nonprofit Service Center 2,000,000 13 (xi) Wilkes-Barre Township 14 (A) Construction and other related costs 15 for the renovation of the township 16 municipal building 500,000 17 (B) Construction and other related costs 18 for the township police building 800,000 19 (xii) Wright Township 20 (A) Construction, infrastructure, 21 abatement of hazardous materials, 22 redevelopment and other costs related 23 to Crestwood Industrial Park 2,500,000 24 (41) Lycoming County 25 (i) County projects 26 (A) Acquisition, construction, 27 infrastructure and other related costs 28 for the Williamsport Crosscutter's 29 Stadium project 15,000,000 30 (B) Design and construction of a rail spur 20070H1589B4129 - 211 -
1 to support the economic development of 2 the New Muncy Industrial Park Phases 3 II, III and IV 1,000,000 4 (C) Design, infrastructure, construction 5 and other related costs for the 6 development of Phase IV of the Muncy 7 Industrial Park 1,000,000 8 (D) Design, construction and other related 9 costs to provide water, sewer and road 10 infrastructure within Timber End Park, 11 a 226-acre designated Keystone 12 Opportunity Zone 1,000,000 13 (E) Construction of rail spurs and related 14 track work to provide rail service to 15 industrial sites for expansion of Muncy 16 Industrial Park, Industrial Properties 17 Corporation 3,000,000 18 (F) Infrastructure site improvements, 19 construction and other necessary costs 20 for a new Army/Reserve center 1,500,000 21 (ii) City of Williamsport 22 (A) Redevelopment and expansion of 23 Susquehanna Health Hospital, including 24 acquisition 10,000,000 25 (B) Acquisition, construction, 26 infrastructure and other related costs 27 for the revitalization of Textrom 28 Lycoming facilities 10,000,000 29 (C) Design and construction of a new 30 intermodal facility, including related 20070H1589B4129 - 212 -
1 infrastructure for the Church Street 2 Transportation Center 4,000,000 3 (D) Infrastructure, redevelopment, 4 construction and other related costs 5 for the improvement and expansion of 6 the Reach Road Industrial Park 1,250,000 7 (iii) Clinton Township 8 (A) Acquisition, construction, 9 infrastructure and other related costs 10 for the White Deer Recreation Complex 1,000,000 11 (iv) Jersey Shore Borough 12 (A) Redevelopment of the Jersey Shore 13 YMCA, including construction and 14 related infrastructure 1,500,000 15 (B) Expansion of existing Department of 16 Conservation and Natural Resources Pine 17 Creek Rail-Trail, including necessary 18 costs 1,000,000 19 (v) Muncy Township 20 (A) Infrastructure within Phase IV of the 21 Muncy Industrial Park 1,000,000 22 (B) Acquisition, construction, 23 infrastructure and other related costs 24 for the Eastern Lycoming County Senior 25 Center 500,000 26 (C) Construction, infrastructure and other 27 related costs for the Halls Station 28 Water Phase I Plus 4,000,000 29 (42) McKean County 30 (i) County projects 20070H1589B4129 - 213 -
1 (A) Impact Kane - redevelopment, 2 rehabilitation, construction and land 3 acquisition necessary for a 4 comprehensive economic 5 development/community development 6 initiative for municipalities located 7 along the Route 6 corridor 10,000,000 8 (B) Infrastructure and other related costs 9 associated with the addition of the 10 state-of-the-art 63-slice CT scanner 11 that provides the only significant 12 diagnostic capability of its kind in 13 the region for Bradford Regional 14 Medical Center 700,000 15 (C) Acquisition and infrastructure related 16 to the construction of the Route 219 17 Visitor/Discovery Center 8,200,000 18 (i.1) McKean County Industrial Development 19 Authority 20 (A) Acquisition, infrastructure and other 21 related costs for the University of 22 Pittsburgh at Bradford and the McKean 23 County Industrial Development Authority 24 development initiative, including 25 renovation and rehabilitation of 26 existing facilities and construction of 27 new facilities 10,000,000 28 (ii) City of Bradford 29 (A) Recreational facility improvements, 30 including the renovation of the Kessel 20070H1589B4129 - 214 -
1 Athletic Complex, construction of a new 2 urban trail system and improvements and 3 repairs to the ice rink facility 4 located in Callahan Park 5,000,000 5 (B) Downtown redevelopment, including the 6 renovation of two major downtown 7 buildings, gateway entrance and 8 downtown streetscape improvements and 9 the revitalization of a city 10 neighborhood through property 11 acquisition, demolition, redevelopment 12 and related infrastructure 13 improvements 5,000,000 14 (iii) Foster Township 15 (A) Environmental mitigation and 16 infrastructure improvements, including 17 the installation of new utilities and 18 roadways at Lafferty Hollow Industrial 19 Park 1,500,000 20 (iv) Kane Borough 21 (A) Construction of a state-of-the-art 22 Women's Diagnostic Breast Center, 23 including infrastructure improvements 24 at Kane Community Hospital 1,600,000 25 (43) Mercer County 26 (i) County projects 27 (A) Infrastructure improvements and 28 utility extensions within the Reynolds 29 East Business Park, a Keystone 30 Opportunity Expansion Zone, as part of 20070H1589B4129 - 215 -
1 the Phase II redevelopment project 600,000 2 (B) Construction of a new Magisterial 3 District Court facility along 4 Barkeyville Road in Pine Township 625,000 5 (C) Construction of a new, modern, 6 multitenant building in the Reynolds 7 East Business Park, a Keystone 8 Opportunity Expansion Zone 1,000,000 9 (ii) City of Sharon 10 (A) Acquisition, construction, 11 infrastructure and other related costs 12 for downtown Sharon revitalization 3,000,000 13 (iii) City of Hermitage 14 (A) Construction, infrastructure and other 15 costs associated with the Buhl Park 16 Community Center renovation 3,000,000 17 (B) ACQUISITION, CONSTRUCTION, <-- 18 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 19 RELATED COSTS FOR THE CITY'S TOWN 20 CENTER DEVELOPMENT 5,000,000 21 (iv) Greenville Borough 22 (A) Redevelopment of various industrial 23 properties, including construction 3,000,000 24 (B) Construction costs related to the 25 expansion of the Greenville Borough 26 building 625,000 27 (C) Infrastructure, rehabilitation, 28 construction and other related costs 29 for Thiel College Academic Center 30 project 2,500,000 20070H1589B4129 - 216 -
1 (D) Infrastructure, rehabilitation,
2 construction and other related costs
3 for the Thiel College Passavant Center
4 project 2,500,000
5 (v) Springfield, Findley and East Lackawannock
6 Townships
7 (A) Construction, infrastructure,
8 redevelopment and other related costs
9 for the Mercer County Industrial and
10 Business Park 8,000,000
11 (44) Mifflin County
12 (i) County projects (Reserved)
13 (ii) Granville Township
14 (A) Infrastructure, construction and other
15 related costs for improvements and
16 expansion of the Granville Township
17 sewage treatment facilities directly
18 related to the Mifflin County
19 Industrial Park expansion project 5,000,000
20 (iii) Mifflin County Industrial Redevelopment <--
21 DEVELOPMENT Corporation <--
22 (A) Construction and infrastructure for
23 mixed-use development of 162 acres
24 along Route 322 near the Burnham
25 Interchange 5,000,000
26 (B) Acquisition, construction,
27 infrastructure and redevelopment of a
28 316-acre expansion to Mifflin County
29 Industrial Park, including access road,
30 water, sewer, gas, electric, railroad
20070H1589B4129 - 217 -
1 and fiber optic extension and 2 connections 10,000,000 3 (C) Renovations, including remediation, 4 building redevelopment and 5 infrastructure improvements in the 6 Mifflin County Industrial Development 7 Corporation Plaza, a brownfield site 5,000,000 8 (D) Acquisition and preparation for 9 redevelopment of blighted properties 10 within the designated Elm Street 11 section of Lewistown Borough 1,000,000 12 (E) Acquisition, extension of 13 infrastructure and roads and building 14 redevelopment of the former Case New 15 Holland facility 5,000,000 16 (45) Monroe County 17 (i) County projects 18 (A) Acquisition, construction, 19 infrastructure and other related costs 20 for the East Stroudsburg School 21 District Memorial Stadium 1,870,000 22 (B) Acquisition, infrastructure 23 improvements and construction of the 24 Monroe County Family Health Center 2,000,000 25 (C) Acquisition, construction and other 26 related costs for the Pocono Mountains 27 Wayfinding Program, consisting of a 28 network of directional signs to guide 29 the traveling public 1,000,000 30 (D) Land acquisition, infrastructure 20070H1589B4129 - 218 -
1 improvements and construction necessary 2 to maintain the competitive position of 3 an existing business entity or for the 4 development of business-ready sites for 5 potential business tenants 1,000,000 6 (ii) Coolbaugh Township 7 (A) Acquisition, construction, 8 infrastructure and other related costs 9 for the Pocono Mountain Public Library 10 Building 1,000,000 11 (B) Acquisition, construction, 12 infrastructure and other related costs 13 for the Pocono Mountains Corporate 14 Center East 4,000,000 15 (C) Acquisition, construction, 16 infrastructure and other related costs 17 for the Commerce Court Extension 1,250,000 18 (D) Acquisition, construction, 19 infrastructure and other related costs 20 for the Pocono Mountain Economic 21 Development Rail Served Business Park 2,000,000 22 (ii.1) Delaware Water Gap Borough 23 (A) Restoration of the Delaware Water Gap 24 Railroad Station 500,000 25 (B) Restoration, infrastructure 26 improvements and construction of the 27 Castle Inn 1,000,000 28 (C) Restoration, infrastructure 29 improvements and construction of the 30 Laird Technology Building 6,000,000 20070H1589B4129 - 219 -
1 (ii.2) Delaware Water Gap Borough, East 2 Stroudsburg Borough, Stroudsburg Borough, 3 Smithfield Township and Stroud Township 4 (A) Infrastructure improvements for 5 telecommunications for business sites 2,000,000 6 (iii) East Stroudsburg Borough 7 (A) Infrastructure and other related costs 8 to renovate East Stroudsburg High 9 School Memorial Stadium 3,000,000 10 (B) Demolition and construction of the 11 International Boiler Works buildings 1,800,000 12 (iv) East Stroudsburg Township 13 (A) Acquisition, construction, 14 infrastructure and other related costs 15 for a parking garage adjacent to Pocono 16 Medical Center 10,000,000 17 (B) Construction of Computer Security 18 Research Center at East Stroudsburg 19 University Research and Technology 20 Park 2,000,000 21 (C) Construction and infrastructure 22 improvements for the World-Class 23 Synchronous Data Center 3,000,000 24 (v) East Stroudsburg, Stroudsburg and Middle 25 Smithfield Townships 26 (A) Acquisition, construction, 27 infrastructure and other related costs 28 for rehabilitation of East Stroudsburg 29 to Delaware Water Gap Rail Line 1,250,000 30 (vi) (Reserved) 20070H1589B4129 - 220 -
1 (vii) Paradise Township 2 (A) Acquisition of a fish hatchery for a 3 park and educational center 1,500,000 4 (viii) Pocono, Paradise and Jackson Townships 5 (A) Construction of bathrooms for persons 6 with disabilities, field improvements 7 and related infrastructure for 8 Challenger Program 100,000 9 (ix) Smithfield Township 10 (A) Construction, acquisition, 11 infrastructure, redevelopment and other 12 costs related to the Pocono Mountains 13 Regional Convention Center 37,500,000 14 (B) Acquisition, infrastructure 15 improvements and construction of the 16 Westfield Medical Center project 2,500,000 17 (C) Acquisition and other costs related to 18 the Viewscape Preservation project on 19 Mosiers Knob Road 2,000,000 20 (D) Construction and other related costs 21 for a new municipal complex 500,000 22 (x) Stroudsburg Borough 23 (A) Acquisition, restoration and expansion 24 of the Sherman Theater 3,000,000 25 (B) Acquisition and renovations to 26 downtown Stroudsburg Hotel and 27 construction of associated parking 28 garage 5,000,000 29 (C) Renovations of Ross-Stulgaitis 30 Stadium 1,000,000 20070H1589B4129 - 221 -
1 (xi) Pocono Mountains Economic Development 2 Corporation 3 (A) Telecommunications infrastructure 4 projects in Middle Smithfield and Price 5 Townships 2,000,000 6 (B) Acquisition, infrastructure and other 7 related costs for the redevelopment of 8 sites on the west end of Monroe County 2,500,000 9 (46) Montgomery County 10 (i) County projects 11 (A) Acquisition, construction, 12 infrastructure and other related costs 13 for the Montgomery County Expo Center 19,000,000 14 (B) Infrastructure improvements and 15 construction for the Manor College 16 Dental Health Center 500,000 17 (C) Abatement of hazardous materials, 18 infrastructure, construction and other 19 related costs for the redevelopment of 20 the Bright Hope public housing 21 facility, Montgomery County Housing 22 Authority 3,000,000 23 (D) Montgomery County Community College 24 (I) Roof replacement on 101 College 25 Drive building 500,000 26 (II) Exterior door replacements on 27 central campus facilities 135,000 28 (III) Construction of a walkway around 29 the perimeter of central campus 323,000 30 (IV) Renovations and other related 20070H1589B4129 - 222 -
1 costs for the relocation and 2 expansion of the theater facility 400,000 3 (ii) Abington Township 4 (A) Acquisition, construction and other 5 related costs for the renovation of the 6 Abington Community Center 1,000,000 7 (B) Acquisition, construction and other 8 related costs to develop a civic 9 facility as part of the Roslyn 10 Redevelopment Program 12,000,000 11 (C) Construction and other related costs 12 for the renovation of the Ardsley 13 Community Center 1,000,000 14 (iii) Ambler Borough 15 (A) Construction and other related costs 16 for the redevelopment of Main Street 10,000,000 17 (B) Construction, renovation, 18 infrastructure and other related costs 19 of a new firehouse 2,000,000 20 (C) Acquisition, site preparation and 21 other related costs for redevelopment 22 of Keasbey and Mattison site, a 23 residential development 7,500,000 24 (D) Construction and renovations for the 25 Keasbey and Mattison Boiler House 26 project 2,000,000 27 (iii.1) Bala Cynwyd 28 (A) Construction and land development 29 project at 211 Belmont Avenue 11,000,000 30 (iii.2) Bridgeport Borough 20070H1589B4129 - 223 -
1 (A) Infrastructure improvements,
2 construction and related costs
3 associated with Bridgeview development 4,500,000
4 (iii.3) Cheltenham Township
5 (A) Construction of expansion of
6 Settlement Music School, including
7 parking facility 3,000,000
8 (B) Construction of bunker for McKinley
9 Fire Company 500,000
10 (C) Construction of bunker for LaMott Fire
11 Company 500,000
12 (D) Construction of patient center for
13 Hope Lodge Cancer Facility 1,200,000
14 (iii.4) Conshohocken Borough
15 (A) Infrastructure improvements and
16 hazardous materials abatement for the
17 Leeland Mansion project 2,250,000
18 (iii.5) East Norriton Township
19 (A) Acquisition, construction,
20 infrastructure, redevelopment and other
21 costs related to the Innovative Life
22 Sciences Center 10,000,000
23 (B) CONSTRUCTION, ACQUISITION, <--
24 INFRASTRUCTURE, REDEVELOPMENT AND OTHER
25 RELATED COSTS FOR A SUSTAINABLE LIFE
26 SCIENCES CENTER 10,000,000
27 (iii.6) Glenside
28 (A) Development and construction of, <--
29 CONSTRUCTION AND OTHER RELATED COSTS
30 FOR Arcadia University campus commons
20070H1589B4129 - 224 -
1 and parking facility 2,000,000 2 (B) Infrastructure improvements and 3 construction for the Arcadia University 4 Student and Community Center project 10,000,000 5 (C) CONSTRUCTION AND OTHER RELATED COSTS <-- 6 FOR A NEW ATHLETIC FIELD AT ARCADIA 7 UNIVERSITY 500,000 8 (D) CONSTRUCTION AND OTHER RELATED COSTS 9 FOR A NEW ACADEMIC BUILDING AT ARCADIA 10 UNIVERSITY 4,500,000 11 (iv) Green Lane Borough 12 (A) Green Lane Borough sidewalk 13 installation 750,000 14 (v) Jenkintown Borough 15 (A) Construction and other related costs 16 for the Southern Gateway multilevel 17 parking garage 6,000,000 18 (vi) Lansdale Borough 19 (A) Infrastructure and other related costs 20 for the construction of a multipurpose 21 senior community center 1,000,000 22 (B) Construction of Phase II of the 23 Lansdale Performing Arts Center, 24 including additions and renovations to 25 the former Masonic Hall 3,300,000 26 (C) Construction and necessary costs for 27 the PEAK Community Center 4,500,000 28 (vii) Limerick Township 29 (A) Construction of a child care center at 30 the Spring Valley YMCA, including land 20070H1589B4129 - 225 -
1 acquisition 2,500,000 2 (vii.1) Lower Gwynedd Township 3 (A) Construction, infrastructure and other 4 costs associated with the Downtown 5 Streetscape Improvement and 6 Beautification project 500,000 7 (vii.2) Lower Merion Township 8 (A) Infrastructure development and 9 construction for 211 Belmont project 4,000,000 10 (B) Acquisition, infrastructure 11 improvements, construction and related 12 costs for the Saint Joseph's University 13 campus-wide projects 15,000,000 14 (C) Renovations and construction for 15 Gladwyne Library 2,000,000 16 (D) Acquisition, infrastructure, 17 rehabilitation, construction and other 18 costs related to the redevelopment of 19 the Ardmore Train Station, including 20 the abatement of hazardous materials 15,000,000 21 (vii.3) Lower Pottsgrove Township 22 (A) Renovations, construction and other 23 related costs for the rehabilitation of 24 the Sunnybrook Ballroom and Convention 25 Center 3,000,000 26 (viii) Lower Providence Township 27 (A) Restoration of John James Audubon 28 Center, including expansion, 29 construction of a new museum and 30 related infrastructure 6,000,000 20070H1589B4129 - 226 -
1 (B) Acquisition, redevelopment, 2 construction and other related costs 3 for the conversion of a brownfield site 4 into a velodrome and events center 10,000,000 5 (ix) Marlborough Township 6 (A) Acquisition, related infrastructure 7 and restoration of Wetzel's Mill and 8 Unami Creek Park area, including 9 construction 1,000,000 10 (x) Norristown Borough 11 (A) Acquisition, construction, 12 infrastructure and other related costs 13 for the Cultural Arts Center 3,000,000 14 (B) Acquisition, redevelopment and 15 construction of the Logan Square 16 enterprise/redevelopment area 10,000,000 17 (C) Acquisition, demolition, 18 infrastructure improvements and 19 construction of the Stoney Creek mixed- 20 income housing development 2,000,000 21 (D) Acquisition, infrastructure 22 improvements and construction of the 23 Nicolet complex 3,500,000 24 (E) Land acquisition, infrastructure 25 improvements and construction for the 26 Riverfront Redevelopment District 27 project 5,000,000 28 (F) Redevelopment and revitalization of 29 the Logan Square 30 enterprise/redevelopment area 10,000,000 20070H1589B4129 - 227 -
1 (G) Acquisition, infrastructure 2 improvements and other costs related to 3 the Amatex/Norfab relocation and 4 improvement project 2,700,000 5 (x.1) Borough of Pottstown 6 (A) Acquisition and redevelopment of the 7 former Bethlehem Steel site 17,500,000 8 (B) Acquisition, redevelopment, 9 construction and other related costs 10 for the High and Evans Street property 11 and Lessig Lot 5,000,000 12 (xi) Pennsburg, Red Hill and Green Lane 13 Boroughs, Marlborough and Upper Hanover 14 Townships 15 (A) Construction, infrastructure, land 16 acquisition and other related costs for 17 the Greater Upper Perkiomen Valley 18 Economic Development Project 2,000,000 19 (xii) Red Hill Borough 20 (A) Expansion of Upper Perkiomen Valley 21 Public Library, including 22 infrastructure and other related costs 1,000,000 23 (xii.1) Borough of Schwenksville 24 (A) Acquisition, infrastructure, 25 construction and related costs for 26 improvements and redevelopment on the 27 east side of Main Street between 28 Centennial Street and Perkiomen Avenue 4,000,000 29 (xiii) Upper Hanover Township 30 (A) Acquisition, construction and related 20070H1589B4129 - 228 -
1 infrastructure for Upper Perkiomen 2 Valley YMCA 4,000,000 3 (B) Construction of outpatient medical 4 facility and medical office building at 5 St. Luke's Quakertown Hospital, 6 including related infrastructure 1,000,000 7 (xiv) Upper Merion Township 8 (A) Infrastructure improvements and 9 construction for Corsair II 5,000,000 10 (B) Acquisition, construction, 11 infrastructure, redevelopment and other 12 costs related to the Upper Merion 13 Recreational Facility 4,000,000 14 (xv) Upper Moreland Township 15 (A) Construction and development of a 16 multipurpose lighted synthetic turf 17 athletic field 500,000 18 (xvi) West Norriton Township 19 (A) Acquisition and related costs for the 20 construction of the Audubon area YMCA 3,000,000 21 (xvii) Montgomery County Industrial 22 Development Authority 23 (A) Site preparation, construction and 24 infrastructure improvements for 25 economic development at Ruth and 26 Clemens Roads, Lower Salford Township 5,000,000 27 (B) Land acquisition, infrastructure and 28 construction of a new ALMAC facility 29 for economic development at Fretz and 30 Wambold 20,000,000 20070H1589B4129 - 229 -
1 (XVIII) WHITPAIN TOWNSHIP <-- 2 (A) CONSTRUCTION, ACQUISITION, 3 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 4 RELATED COSTS FOR A COMMUNITY WELLNESS 5 CENTER 7,500,000 6 (47) Montour County 7 (i) County projects 8 (A) Acquisition and development of a 9 county industrial park 1,000,000 10 (B) Infrastructure, construction and other 11 related costs for the development and 12 construction of a new Geisinger 13 Laboratory Medicine Building 20,000,000 14 (C) Infrastructure, construction and other 15 related costs for the development and 16 construction of a new Geisinger Genomic 17 Medicine Institute 5,000,000 18 (ii) Danville Borough 19 (A) Land acquisition, infrastructure 20 improvements and construction of a 21 parking garage 1,000,000 22 (48) Northampton County 23 (i) County projects 24 (A) Construction, redevelopment and other 25 related costs to build the SteelSax 26 Performing Arts and Broadcast 27 Center/Events Center 12,000,000 28 (B) Infrastructure improvements, 29 renovations and construction for the 30 Lehigh Heavy Forge Company industrial 20070H1589B4129 - 230 -
1 area 10,000,000 2 (C) Land acquisition, infrastructure 3 improvements and construction necessary 4 to maintain the competitive position of 5 an existing business entity or for the 6 development of business-ready sites for 7 potential business tenants 1,000,000 8 (D) DEVELOPMENT, CONSTRUCTION AND OTHER <-- 9 RELATED COSTS FOR AN ECOMAGINATION 10 HEALTHCARE CAMPUS FOR ST. LUKE'S 11 HOSPITAL AND HEALTH NETWORK 5,800,000 12 (ii) Pen Argyl Borough 13 (A) Infrastructure improvements and 14 construction of Weona Park Pool and 15 bath house facility 10,000,000 16 (B) Land acquisition, infrastructure 17 improvements and construction of a 18 government center/fire station 5,000,000 19 (C) Construction of a community center, 20 including necessary costs 5,000,000 21 (iii) Bangor Borough 22 (A) Acquisition, infrastructure 23 improvements and construction of a 24 garage and salt storage facility 2,500,000 25 (B) Acquisition and construction of a 26 municipal complex 5,000,000 27 (C) Acquisition and renovations to the 28 Colonial Hotel 500,000 29 (D) Renovations of the Trust Building 500,000 30 (iv) City of Bethlehem 20070H1589B4129 - 231 -
1 (A) Construction of South Main Street 2 parking garage 5,000,000 3 (B) Construction of 4th and Broadway 4 parking garage 3,000,000 5 (C) Acquisition, infrastructure 6 improvements and construction of the 7 Farr Building 1,000,000 8 (D) Renovations and construction of the 9 Stock House Visitors Center 1,000,000 10 (E) Renovations to the Fowler Family 11 Southside Center, Northampton Community 12 College 1,000,000 13 (F) Infrastructure improvements and 14 construction of Lehigh University 15 science and technology infrastructure 10,000,000 16 (G) Construction, redevelopment and other 17 related costs to build a facility to 18 employ persons with disabilities 500,000 19 (H) Site improvement, renovation and 20 expansion of incubator facility for Ben 21 Franklin TechVentures 7,500,000 22 (I) Construction for repair and 23 restoration of South Bethelehem flood 24 control system 500,000 25 (J) CONSTRUCTION, INFRASTRUCTURE, <-- 26 ENVIRONMENTAL REMEDIATION, 27 REDEVELOPMENT AND OTHER RELATED COSTS 28 AND IMPROVEMENTS TO THE MAJESTIC 29 BROWNFIELDS REDEVELOPMENT PROJECT 20,000,000 30 (v) Bethlehem Township 20070H1589B4129 - 232 -
1 (A) Acquisition, infrastructure 2 improvements and construction for the 3 St. Luke's Riverside Health Campus 15,000,000 4 (B) Renovations and infrastructure 5 improvements to the boiler and cooling 6 towers, Northampton Community College 500,000 7 (C) Renovations and expansion of the 8 automotive technology program facility, 9 Northampton Community College 1,000,000 10 (vi) City of Easton 11 (A) Acquisition, redevelopment and 12 construction of a parking garage to 13 serve the business district, Bushkill 14 Creek and Lafayette College areas 2,250,000 15 (B) Infrastructure, redevelopment and 16 construction of a Northampton County 17 Government Center parking garage 3,500,000 18 (C) Renovation of a commercial facility 19 and construction of exhibits for the 20 Northampton County Historical and 21 Genealogical Society Museum 4,500,000 22 (D) Infrastructure, demolition, 23 construction and other related costs 24 for the Delaware Terrace and Delaware 25 Terrace Annex Community Development 26 project, consisting of rehabilitation 27 of a blighted housing complex 2,000,000 28 (E) Construction of a multilevel parking 29 garage in the vicinity of the 30 Northampton County Courthouse 5,000,000 20070H1589B4129 - 233 -
1 (vii) Glendon Borough 2 (A) Construction of infrastructure to 3 serve industrial park and community 4 development 500,000 5 (viii) North Catasauqua Borough 6 (A) Renovations of Borough Hall Senior 7 Center and community multipurpose 8 facilities 650,000 9 (ix) Palmer Township 10 (A) Acquisition, construction and other 11 related costs for the National High 12 School Sports Hall of Fame Museum 5,000,000 13 (B) Infrastructure and construction of an 14 interchange at the intersection of 15 Route 33 and Main Street in Palmer 16 Township 14,000,000 17 (C) Site preparation, infrastructure and 18 construction of facilities for 19 commercial and industrial use 15,000,000 20 (x) Wilson Borough 21 (A) Infrastructure, site preparation and 22 remediation, rehabilitation and 23 historic reconstruction for community 24 development 5,000,000 25 (B) Acquisition, infrastructure 26 improvements and construction of Dixie 27 Lofts 5,000,000 28 (49) Northumberland County 29 (i) County projects 30 (A) Acquisition, infrastructure, 20070H1589B4129 - 234 -
1 construction and other related costs 2 for the Mount Carmel Area Recreation 3 Complex 2,000,000 4 (i.1) City of Sunbury 5 (A) Acquisition, infrastructure, 6 construction, equipment and other 7 related costs for the construction of a 8 new Emergency Department at the Sunbury 9 Community Hospital 5,000,000 10 (B) Acquisition, infrastructure, 11 construction, equipment and other 12 related costs for renovations to the 13 Radiology Suite at the Sunbury 14 Community Hospital 3,000,000 15 (i.2) Coal Township 16 (A) Construction and other costs related 17 to Shamokin Area Community Hospital 18 improvements 500,000 19 (ii) Milton Borough 20 (A) Acquisition, construction, 21 infrastructure and other related costs 22 for a new Milton Public Library 1,000,000 23 (B) Infrastructure, rehabilitation and 24 construction for improvements to Marsh 25 Road in the vicinity of the Milton Area 26 Industrial Park 2,000,000 27 (iii) Point Township <-- 28 (A) Acquisition, construction, 29 infrastructure and other related costs 30 for a renewable energy plant 1,000,000 20070H1589B4129 - 235 -
1 (B) Construction and other related costs 2 for the SunPoint Renewable Energy 3 Project, including any necessary 4 transportation-related infrastructure 5 improvements 3,000,000 6 (iv) City of Shamokin 7 (A) Construction of a mining technology 8 and training center 2,000,000 9 (50) Perry County 10 (i) County projects (Reserved) 11 (ii) Penn Township 12 (A) Construction of new facility to house 13 preschool program and after school 14 program at the Early Education Center 500,000 15 (iii) Spring Township 16 (A) Audubon Hawk Watch expansion, 17 including construction of viewing area 18 for persons with disabilities and 19 related infrastructure improvements 275,000 20 (51) Philadelphia County 21 (i) County projects 22 (A) Construction, infrastructure and other 23 related costs for the expansion and 24 rehabilitation of Children's Crisis 25 Treatment Center 4,000,000 26 (ii) City of Philadelphia 27 (A) Construction and other related costs 28 for the University of Pennsylvania 29 Research Center 16,000,000 30 (B) Redevelopment and other costs related 20070H1589B4129 - 236 -
1 to the Inter-Community Development MT. <--
2 AIRY REVITALIZATION Corporation
3 northwest neighborhood streetscape
4 improvements 1,500,000
5 (C) Construction, redevelopment and other
6 costs associated with the Academy of
7 Natural Science Exhibit 500,000
8 (D) Construction, infrastructure,
9 redevelopment and other related costs
10 to upgrade and renovate the Curtis
11 Institute for Music 20,000,000
12 (E) Construction and other related costs
13 for the Nueva Jerusalem mixed-use
14 facility 1,500,000
15 (F) Construction, infrastructure and other
16 related costs for the Pastore Unidos
17 Por Filadelfia project related to
18 minority and senior programming 500,000
19 (G) Construction and other related costs
20 for the renovation and expansion of the
21 Columbia North Community YMCA 3,600,000
22 (H) Construction, infrastructure and other
23 related costs for the Betsy Ross House 500,000
24 (I) Infrastructure and other costs related
25 to the Hunting Park 21st Century
26 Community and Learning Center 1,000,000
27 (J) Construction, infrastructure and other
28 related costs for the Stenton Service
29 Wing Restoration Project 1,000,000
30 (K) Construction, redevelopment and other
20070H1589B4129 - 237 -
1 costs related to the new Pleasant 2 Playground building 1,000,000 3 (L) Construction, acquisition, demolition, 4 redevelopment and other costs 5 associated with South Philadelphia 6 Housing 10,000,000 7 (M) Construction and other related costs 8 for the renovation of International 9 House 8,000,000 10 (N) Acquisition, construction and other 11 related costs for the redevelopment of 12 the Historic John Grass Company 13 Building 700,000 14 (O) Acquisition, construction, 15 infrastructure and other related costs 16 for the Norris Square Children's 17 Center 500,000 18 (P) Construction and other related costs 19 for North Philadelphia retail 20 corridors 4,000,000 21 (Q) Construction, infrastructure and other 22 related costs for a regional emergency 23 services facility 30,000,000 24 (R) Construction, infrastructure and other 25 related costs for North Philadelphia 26 recreation 5,000,000 27 (S) Acquisition, construction and other 28 related costs for the Philadelphia 29 Polytechnic Charter High School 10,000,000 30 (T) Construction and other related costs 20070H1589B4129 - 238 -
1 for the development of a skate park at 2 Paine Park 2,750,000 3 (U) Construction and other related costs 4 for improvements to the Friends Housing 5 Cooperative Foundation facilities 250,000 6 (V) Acquisition, construction, 7 infrastructure and other related costs 8 for Chester Avenue revitalization 1,000,000 9 (W) Acquisition, construction, 10 infrastructure and other related costs 11 to revitalize the Market Street 12 Corridor, including adjacent areas 30,000,000 13 (X) Construction, infrastructure and other 14 related costs for the Children's Zoo 8,200,000 15 (Y) Construction, infrastructure and other 16 related costs for the McNeil Aviary 6,000,000 17 (Z) Construction, infrastructure and other 18 related costs for the Philadelphia Zoo 19 Big Cat exhibit 5,800,000 20 (AA) Construction and other related costs 21 for the Washington Square 22 redevelopment 1,000,000 23 (BB) Construction of new facilities for 24 the Wellness Community's National 25 Survivorship Research and Training 26 Institute 5,000,000 27 (CC) For existing building, gallery, 28 exhibit construction and renovations 29 including climate control, electric 30 upgrades, technology upgrades and 20070H1589B4129 - 239 -
1 infrastructure 15,000,000 <-- 2 INFRASTRUCTURE AT THE FRANKLIN <-- 3 INSTITUTE 15,000,000 4 (DD) For construction of new building for 5 the Franklin Institute 15,000,000 6 (EE) Rehabilitation and expansion of the 7 Main Service Center at the Children's 8 Crisis Treatment Center, including 9 construction 4,000,000 10 (FF) Acquisition, construction, 11 infrastructure and other costs related 12 to the expansion of the Fox Chase 13 Recreational Center 1,200,000 14 (GG) Construction of community activity 15 center at LaSalle College High School 2,000,000 16 (HH) Construction of an educational 17 conference center at the Cranaleith 18 Spiritual Center 1,400,000 19 (II) Expansion of the Crisis Center at 20 Covenant House Pennsylvania 2,000,000 21 (JJ) Demolition, infrastructure 22 improvements, renovations and 23 construction for University of 24 Pennsylvania Law School building 1,000,000 25 (KK) Design, engineering and construction 26 of a pedestrian overpass at the 27 intersection of Schuylkill River Park 28 and Locust Street 2,000,000 29 (LL) Acquisition and construction of St. 30 Rita's Conference Center 1,000,000 20070H1589B4129 - 240 -
1 (MM) Construction of Fairmount Park 2 Audubon Center at Strawberry Mansion 2,500,000 3 (NN) Infrastructure improvements, 4 renovations and construction of the 5 Atwater Kent Museum 1,000,000 6 (OO) Infrastructure improvements and 7 construction of the Heritage Center at <-- 8 the Union League building 2,000,000 9 CONSTRUCTION FOR PUBLICLY ACCESSIBLE <-- 10 CENTER FOR CIVIL WAR STUDIES AT THE 11 UNION LEAGUE 2,000,000 12 (PP) Development and construction of the 13 Mill Creek Community Center 8,000,000 14 (QQ) Infrastructure improvements, 15 renovations and construction for the 16 Mercy Family Center 500,000 17 (RR) Renovations and construction of the 18 multiuse athletic facility at Cardinal 19 Dougherty High School 1,000,000 20 (SS) Renovations to the Sultan Jihad Ahmad 21 Community Center 2,300,000 22 (TT) Acquisition, infrastructure 23 improvements, renovations and 24 construction for the Steele Heddle 25 Building development project 5,000,000 26 (UU) Renovations to the Louise Brookins 27 Human Services Building 500,000 28 (VV) Renovations and construction of the 29 Penrose Recreation Center 500,000 30 (WW) Demolition, infrastructure 20070H1589B4129 - 241 -
1 improvements and construction for the 2 Uptown Entertainment Center 500,000 3 (XX) Demolition, acquisition, 4 infrastructure improvements and 5 construction of the APM Wellness Center 6 and headquarters 4,000,000 7 (YY) Construction of the Haven Peniel 8 Senior Citizens Residence 400,000 9 (ZZ) Demolition and construction of the 10 Men and Women for Human Excellence 11 facility 250,000 12 (AAA) Expansion of Northeast Philadelphia 13 Regional Center of the Community 14 College of Philadelphia 10,100,000 15 (BBB) Construction of Lutheran Archives 16 Center 1,000,000 17 (CCC) Acquisition, infrastructure 18 improvements, construction and related 19 costs for expansion of Saint Joseph's 20 University Campion Student Center 5,950,000 21 (DDD) Acquisition, infrastructure 22 improvements, construction and related 23 costs for renovations to Saint Joseph's 24 University facilities at 5920 City 25 Avenue 2,500,000 26 (EEE) Renovations, construction and 27 infrastructure repair and 28 revitalization of West Market Street 20,000,000 29 (FFF) Renovations and construction of the 30 Haddington/Shepard recreation complex 2,000,000 20070H1589B4129 - 242 -
1 (GGG) Renovations and construction of the 2 PAPA Community Recreation Center 5,000,000 3 (HHH) Demolition, renovation and 4 construction of Mantua Hall 7,000,000 5 (III) Renovation and construction for the 6 Mill Creek revitalization project, to 7 include housing, recreation and 8 economic development 10,000,000 9 (JJJ) Demolition, renovation and 10 construction of the Croydon apartment 11 complex for housing, commercial 12 development, recreation and education 13 facilities 3,000,000 14 (KKK) Renovation and construction of a 15 community center as part of the Beaver 16 Wynnfield Alternative Program 3,000,000 17 (LLL) Renovation and construction of the 18 Chalmers Athletic and Recreation 19 Complex 10,000,000 20 (MMM) Renovation of the Lincoln/Market 21 Square education center and office 22 complex 10,000,000 23 (NNN) Construction of Enterprise Heights 24 for a retail, community space and 25 housing complex 2,500,000 26 (OOO) Renovation of Mantua Haverford 27 Community Center 2,000,000 28 (PPP) Renovations to the Center for Human 29 Advancement for education center, 30 office complex and community space 5,000,000 20070H1589B4129 - 243 -
1 (QQQ) Renovation and construction of the 2 Family Revitalization Complex 150,000,000 3 (RRR) Renovation and expansion of the 4 Keystone Hospice 10,000,000 5 (SSS) Demolition, renovation and 6 construction of Freedom Park complex 10,000,000 7 (TTT) Renovations, infrastructure 8 improvements and construction of the 9 Historical Society of Pennsylvania 10 building 2,500,000 11 (UUU) Renovation and construction of 12 animal shelter 2,000,000 13 (VVV) Renovation and construction of a 14 children and family health care complex 15 in West Philadelphia 3,000,000 16 (WWW) Renovation and construction of the 17 West Philadelphia Technology Training 18 Center 2,500,000 19 (XXX) Acquisition, demolition, renovation 20 and construction for Thomas Jefferson 21 University Special Diagnostic and 22 Treatment medical and surgical 23 facilities 50,000,000 24 (YYY) Demolition and abatement costs for 25 the Paschall Homes redevelopment 26 project 8,600,000 27 (ZZZ) Acquisition, construction, 28 infrastructure, redevelopment and other 29 costs related to the Plaza at 30 Enterprise Heights 7,000,000 20070H1589B4129 - 244 -
1 (AAAA) Acquisition, construction, 2 infrastructure, abatement of hazardous 3 materials and other costs related to 4 the Northwest Philly Arts and Culture 5 Center 10,000,000 6 (BBBB) (RESERVED) <-- 7 (CCCC) Construction, infrastructure, 8 redevelopment and other costs related 9 to Holy Family University campus 10 improvements 6,000,000 11 (DDDD) Construction, redevelopment and 12 other costs related to Philadelphia 13 University campus improvements 2,000,000 14 (EEEE) Construction and other costs 15 related to the Northeast Family YMCA 3,500,000 16 (FFFF) Construction, infrastructure, 17 redevelopment, abatement of hazardous 18 materials and other costs related to 19 the Independence Charter School 8,600,000 20 (GGGG) Construction, redevelopment and 21 other costs related to the Italian 22 American Cultural Center 2,000,000 23 (HHHH) Construction related to West 24 Parkside Building economic and 25 commercial development project 500,000 26 (IIII) Infrastructure improvements and 27 construction for the Nazareth Hospital 28 Oncology project 1,000,000 29 (JJJJ) Hahnemann Hospital, infrastructure 30 improvements, construction and other 20070H1589B4129 - 245 -
1 related costs for the expansion of the 2 Intensive Care Unit 4,500,000 3 (KKKK) Hahnemann Hospital, infrastructure 4 improvements, construction and other 5 related costs for modernization and 6 expansion of the operating rooms and 7 recovery room 10,000,000 8 (LLLL) Demolition, infrastructure 9 improvements, construction and other 10 costs related to the Convocation and 11 Basketball Arena project at Drexel 12 University 25,000,000 13 (MMMM) Infrastructure improvements and 14 development related to the University 15 City Gateway project 30,000,000 16 (NNNN) Renovation and construction of the 17 Haddington Health Center 2,000,000 18 (OOOO) Infrastructure improvements for the 19 former Liddonfield Homes at Torresdale 20 Avenue and Jackson Place 10,000,000 21 (PPPP) Construction and other related 22 costs for the Octavius V. Catto 23 Memorial project 1,000,000 24 (QQQQ) Construction, infrastructure 25 improvements and other costs related to 26 the expansion of The Children's 27 Hospital of Philadelphia on the site of 28 the former Philadelphia Civic Center 30,000,000 29 (RRRR) Independence National Historic 30 Park, installation of below-ground 20070H1589B4129 - 246 -
1 projection and electronic equipment to 2 operate dramatization of events leading 3 to the Declaration of Independence for 4 the Lights of Liberty 3,300,000 5 (SSSS) Acquisition, infrastructure 6 improvements and construction for the 7 Taller Puertorriqueno, Inc. expansion 8 project 5,000,000 9 (TTTT) Disability job training and 10 residential project. Acquisition, 11 infrastructure improvements, 12 construction and other costs related to 13 a rehabilitation facility at 8th and 14 Lehigh Streets 6,000,000 15 (UUUU) Infrastructure improvements, 16 construction and other costs related to 17 the Aquatic Center project for the 18 Overbrook School for the Blind 3,000,000 19 (VVVV) Demolition, renovations, abatement 20 and other costs related to the 21 Frankford Arsenal Remediation and 22 Revitalization project 2,500,000 23 (WWWW) Construction, redevelopment and 24 other costs related to the Energy 25 Coordinating Agency Training Center 853,000 26 (XXXX) Infrastructure improvements and 27 construction for Allens Lane Art 28 Center 250,000 29 (YYYY) Construction and other costs 30 related to the Lower Germantown Medical 20070H1589B4129 - 247 -
1 Center project 500,000 2 (ZZZZ) Infrastructure improvements and 3 construction of the Germantown 4 Revitalization project 500,000 5 (AAAAA) Infrastructure improvements for 6 Elmwood Park 500,000 7 (BBBBB) Construction for Inglis House 250,000 <-- 8 (BBBBB) (RESERVED) <-- 9 (CCCCC) Renovations and expansion of 10 Christian Street YMCA 500,000 11 (DDDDD) Redevelopment and construction for 12 Kingsessing Heights CDC Revitalization 13 Plan 750,000 14 (EEEEE) Acquisition and improvements for 15 Intercultural Family Services, Inc. 250,000 16 (FFFFF) Renovations of building for the 17 Boys Latin of Philadelphia Charter 18 School 300,000 19 (GGGGG) Building renovations for the <-- 20 African American Museum 250,000 21 (GGGGG) (RESERVED) <-- 22 (HHHHH) Renovation of storefront property 23 for the Art Sanctuary 500,000 24 (IIIII) Renovations to RACS building 500,000 25 (JJJJJ) Renovations for the Belmont 26 Community building 1,250,000 27 (KKKKK) Construction and infrastructure 28 for the Grays Ferry Memorial Park at 29 29th and Tasker Streets 500,000 30 (LLLLL) Infrastructure improvements, 20070H1589B4129 - 248 -
1 construction and other costs related to 2 the LISC Multi-Partner West 3 Philadelphia Initiative 4,000,000 4 (MMMMM) Acquisition, construction, 5 infrastructure and other related costs 6 to revitalize Ogontz Avenue corridor 5,000,000 7 (NNNNN) Infrastructure improvements, 8 construction and other related costs 9 for a hotel facility 5,000,000 10 (OOOOO) Construction of emergency 11 department, including the expansion of 12 existing medical and surgical 13 outpatient facilities to Saint 14 Christopher's Children's Hospital 10,000,000 15 (PPPPP) Construction, infrastructure 16 improvements and other costs related to 17 the Dilworth Plaza project 20,000,000 18 (QQQQQ) Acquisition, construction and 19 other costs related to the 20 redevelopment of the John Wanamaker 21 School site 6,000,000 22 (RRRRR) Acquisition, construction, 23 infrastructure and other related costs 24 to revitalize the corridor from Greene 25 Street and Pulaski Avenue to Greene 26 Street and Berkley Street, including 27 adjacent areas 30,000,000 28 (SSSSS) Acquisition, construction, 29 infrastructure and other related costs 30 to revitalize the corridor from Wayne 20070H1589B4129 - 249 -
1 Avenue and Lincoln Drive to Wayne 2 Avenue and Berkley Street, including 3 adjacent areas 30,000,000 4 (TTTTT) Acquisition, construction, 5 infrastructure and other related costs 6 to revitalize the corridor from 7 Germantown Avenue and Willow Grove 8 Avenue to Germantown Avenue and Cecil 9 B. Moore Avenue, including adjacent 10 areas 30,000,000 11 (UUUUU) Acquisition, construction, 12 infrastructure and other related costs 13 to revitalize the corridor from Chelten 14 Avenue and Wister Street to Pulaski 15 Avenue and Chelten Avenue, including 16 adjacent areas 30,000,000 17 (VVVVV) Acquisition, construction, 18 infrastructure and other related costs 19 to revitalize the corridor from Broad 20 Street and Olney Avenue to Chew Avenue 21 and Mt. Pleasant Avenue, including 22 adjacent areas 30,000,000 23 (WWWWW) Acquisition, construction, 24 infrastructure and other related costs 25 to revitalize the corridor from 26 Wadsworth Avenue to 18th Street and 27 Cheltenham Avenue, including adjacent 28 areas 30,000,000 29 (XXXXX) Acquisition, construction, 30 infrastructure and other related costs 20070H1589B4129 - 250 -
1 to revitalize the corridor from Stenton 2 Avenue and Ogontz Avenue to Stenton 3 Avenue and Mt. Pleasant Avenue, 4 including adjacent areas 30,000,000 5 (YYYYY) Acquisition, construction, 6 infrastructure and other related costs 7 to revitalize the corridor from Broad 8 Street and Cheltenham Avenue to Broad 9 Street and Vine Street, including 10 adjacent areas 30,000,000 11 (ZZZZZ) Acquisition, construction, 12 infrastructure and other related costs 13 to revitalize the corridor from 80th 14 Avenue and Ogontz Avenue to 65th Avenue 15 and Ogontz Avenue, including adjacent 16 areas 30,000,000 17 (A6) Acquisition, construction, 18 infrastructure and other related costs 19 to revitalize the corridor from 20 Cheltenham Avenue to Ogontz Avenue, 21 including adjacent areas 30,000,000 22 (B6) Construction, redevelopment and other 23 related costs for the People's 24 Emergency Center rehabilitation 25 project 1,500,000 26 (C6) Acquisition, construction, 27 infrastructure and other costs related 28 to the Academy of Vocal Arts expansion 29 project 1,250,000 30 (D6) Acquisition, construction, 20070H1589B4129 - 251 -
1 infrastructure, redevelopment and other 2 costs related to the Einstein Emergency 3 Department expansion 8,000,000 4 (E6) Acquisition, construction, 5 infrastructure and other costs related 6 to the Center for Autism expansion 7 project 7,600,000 8 (F6) Acquisition, construction, 9 infrastructure, redevelopment and other 10 costs related to the Cheltenham and 11 Ogontz Avenues redevelopment project 10,000,000 12 (G6) Construction, infrastructure and 13 other related costs for renovations to 14 the African American Museum 250,000 <-- 15 THE AFRICAN AMERICAN MUSEUM 500,000 <-- 16 (H6) Construction, redevelopment and other 17 costs related to the Avenue of the Arts 18 project 25,000,000 19 (I6) Construction, redevelopment and other 20 related costs for the Academy of 21 Natural Sciences 24,000,000 22 (J6) Construction, acquisition, 23 redevelopment and other related costs 24 for the Uptown Theater 3,000,000 25 (K6) Construction, redevelopment and other 26 related costs for the Philadelphia 27 Center for Art and Technology 1,000,000 28 (L6) Construction, acquisition and other 29 related costs for the Academy in 30 Manayunk Institute for Learning and 20070H1589B4129 - 252 -
1 Research 5,000,000 2 (M6) Construction, infrastructure and 3 other related costs for Congreso's 4 Education and Youth Building 4,000,000 5 (N6) Design, construction, renovation and 6 expansion of emergency room, including 7 new patient rooms at Mercy Philadelphia 8 Hospital 4,350,000 9 (O6) Improvements to George Washington 10 High School track and related 11 facilities, including necessary costs 2,100,000 12 (P6) Infrastructure improvements, 13 renovations and construction for the 14 Juniata Golf restoration project 500,000 15 (Q6) Acquisition, infrastructure 16 improvements and construction for the 17 Empowerment Village project 2,000,000 18 (R6) Renovations and construction for the 19 Visiting Nurse Association building 900,000 20 (S6) Renovations and rehabilitation for 21 the Peoples Emergency Center 3,000,000 22 (T6) Renovations and expansion of the 23 Northeastern Hospital Obstetric Suite 24 for Temple Health 2,500,000 25 (U6) Renovations and construction of the 26 Boyer Pavilion at Temple University 27 Hospital 7,500,000 28 (V6) Construction and related costs for 29 the Globe Dye Works development 30 project 2,000,000 20070H1589B4129 - 253 -
1 (W6) Renovations of the Devon Theater of 2 Performing Arts into an arts center and 3 retail stores 1,000,000 4 (X6) Infrastructure improvements, 5 construction and other related costs 6 for the Urban Youth Baseball Academy 3,000,000 7 (Y6) Acquisition, renovations, 8 construction and other related costs 9 for the Academy of Vocal Arts 1,250,000 10 (Z6) Construction, infrastructure 11 improvements and other related costs to 12 the Academy of Natural Sciences 24,000,000 13 (A7) Acquisition, infrastructure 14 improvements, construction and other 15 costs related to the Kensington and 16 Allegheny Commercial Corridor project 2,500,000 17 (B7) Construction and infrastructure 18 improvements for the Franklin Towne 19 Charter High School expansion project 3,500,000 20 (C7) Construction and infrastructure 21 improvements for the Temple University 22 Restoration project 14,500,000 23 (D7) Construction, infrastructure 24 improvements and other costs related to 25 the Free Library of Philadelphia 26 Restoration project 30,000,000 27 (E7) Construction, infrastructure 28 improvements and other costs related to 29 the Avenue of the Arts North Broad 30 Streetscape project 20,000,000 20070H1589B4129 - 254 -
1 (F7) Construction, infrastructure 2 improvements and other costs related to 3 the President's House project 3,500,000 4 (G7) Construction, infrastructure 5 improvements and other costs related to 6 the Robin Hood Dell East project 2,500,000 7 (H7) Construction, infrastructure 8 improvements and other costs related to 9 the Community Performing Arts Center at 10 Venice Island project 1,000,000 11 (I7) Construction and other related costs 12 for the SWAT Bomb Tactical Facility 13 project 3,375,000 14 (J7) Construction and other related costs 15 for the Youth Study Center 9,625,000 16 (K7) ACQUISITION, CONSTRUCTION, <-- 17 INFRASTRUCTURE REDEVELOPMENT AND OTHER 18 RELATED COSTS FOR THE HISTORIC BOYD 19 THEATRE PROJECT 21,500,000 20 (L7) ACQUISITION, INFRASTRUCTURE, 21 REDEVELOPMENT AND OTHER RELATED COSTS 22 FOR THE MAZZONI CENTER PROJECT 2,000,000 23 (M7) ACQUISITION, CONSTRUCTION, 24 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 25 RELATED COSTS FOR A YOUTH HOCKEY 26 EDUCATION AND TRAINING CENTER PROJECT 20,000,000 27 (N7) ACQUISITION, CONSTRUCTION, 28 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 29 RELATED COSTS FOR A BASKETBALL TRAINING 30 FACILITY PROJECT 15,000,000 20070H1589B4129 - 255 -
1 (O7) ACQUISITION, CONSTRUCTION, 2 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 3 RELATED COSTS FOR A HOTEL PROJECT 4 LOCATED ADJACENT TO THE PENNSYLVANIA 5 CONVENTION CENTER 20,000,000 6 (P7) CONSTRUCTION, ABATEMENT OF HAZARDOUS 7 MATERIALS AND OTHER RELATED COSTS FOR 8 THE TURNER ELEMENTARY SCHOOL CONVERSION 9 PROJECT 1,000,000 10 (Q7) CONSTRUCTION AND OTHER RELATED COSTS 11 FOR THE UNIVERSITY OF THE SCIENCES OF 12 PENNSYLVANIA MCNEIL SCIENCE AND 13 TECHNOLOGY CENTER EXPANSION PROJECT 9,000,000 14 (R7) ACQUISITION, CONSTRUCTION AND OTHER 15 RELATED COSTS FOR THE LIBERTY 16 RESOURCES, INC., PROJECT 25,000,000 17 (S7) ACQUISITION, CONSTRUCTION, 18 REDEVELOPMENT AND OTHER RELATED COSTS 19 FOR THE WEAVERS WAY CO-OP EXPANSION 20 PROJECT 2,000,000 21 (T7) CONSTRUCTION, INFRASTRUCTURE, 22 RESTORATION AND OTHER RELATED COSTS FOR 23 THE REHABILITATION OF THE CRUISER 24 OLYMPIA AT INDEPENDENCE SEAPORT MUSEUM 10,400,000 25 (U7) CONSTRUCTION, INFRASTRUCTURE AND 26 OTHER RELATED COSTS FOR AN AREA FOR 27 SCREENING AND INSPECTION AT PIER 98 AND 28 PIER 98 ANNEX AT THE PORT OF 29 PHILADELPHIA 10,000,000 30 (V7) CONSTRUCTION AND OTHER RELATED COSTS 20070H1589B4129 - 256 -
1 FOR REPAIRS AND RESTORATION OF THE DRY 2 DOCK AT AKER PHILADELPHIA SHIPYARD 5,000,000 3 (W7) CONSTRUCTION, INFRASTRUCTURE AND 4 OTHER RELATED COSTS FOR IMPROVEMENTS AT 5 TIOGA TERMINAL AT THE PORT OF 6 PHILADELPHIA 4,000,000 7 (X7) ACQUISITION, CONSTRUCTION, 8 DEMOLITION, REDEVELOPMENT AND OTHER 9 RELATED COSTS FOR AN EDUCATIONAL 10 FACILITY IN SOUTH PHILADELPHIA 10,000,000 11 (Y7) ACQUISITION, CONSTRUCTION, 12 DEMOLITION, REDEVELOPMENT, 13 INFRASTRUCTURE AND OTHER RELATED COSTS 14 FOR A TRAINING FACILITY IN SOUTH 15 PHILADELPHIA 10,000,000 16 (Z7) CONSTRUCTION AND OTHER RELATED COSTS 17 FOR POINT BREEZE COMMERCIAL CORRIDOR 18 IMPROVEMENTS 1,300,000 19 (A8) CONSTRUCTION AND OTHER RELATED COSTS 20 FOR THE IMHOTEP CHARTER SCHOOL 4,750,000 21 (B8) ACQUISITION, CONSTRUCTION, 22 INFRASTRUCTURE AND OTHER RELATED COSTS 23 TO REDEVELOP MT. AIRY 5,000,000 24 (C8) CONSTRUCTION AND OTHER RELATED COSTS 25 FOR THE ODUNDE INSTITUTE 250,000 26 (D8) CONSTRUCTION, INFRASTRUCTURE 27 IMPROVEMENTS AND OTHER COSTS RELATED TO 28 THE ESPERANZA CAMPUS PROJECT 3,000,000 29 (E8) CONSTRUCTION, INFRASTRUCTURE 30 IMPROVEMENTS AND OTHER COSTS RELATED TO 20070H1589B4129 - 257 -
1 THE GIRARD SQUARE DEVELOPMENT PROJECT 2 FOR MIXED-USE COMMERCIAL DEVELOPMENT, 3 INCLUDING HOTEL, OFFICE, RETAIL AND 4 PARKING IN AN AREA BOUNDED BY 12TH 5 STREET TO 11TH STREET AND MARKET STREET 6 TO CHESTNUT STREET 60,000,000 7 (F8) ACQUISITION, INFRASTRUCTURE 8 IMPROVEMENTS AND CONSTRUCTION OF A 9 COMMUNITY BIRTHING CENTER IN NORTHEAST 10 PHILADELPHIA 10,000,000 11 (G8) CONSTRUCTION FOR BROOKLYN HEIGHTS 12 HOUSING PROJECT 2,000,000 13 (H8) CONSTRUCTION AND RELATED COSTS FOR 14 THE SBARRO HEALTH RESEARCH ORGANIZATION 15 RESEARCH RESIDENCE 3,500,000 16 (I8) CONSTRUCTION AND RELATED COSTS FOR 17 THE SKYLINE PERFORMING ARTS CENTER AT 18 THE UNIVERSITY OF THE ARTS 1,500,000 19 (J8) CONSTRUCTION AND OTHER RELATED COSTS 20 FOR IMPROVEMENTS TO THE SMITH MEMORIAL 21 PLAYHOUSE AT FAIRMOUNT PARK 1,500,000 22 (K8) PLAZA CONSTRUCTION AT THE 23 PHILADELPHIA LUTHERAN THEOLOGICAL 24 SEMINARY 1,250,000 25 (L8) ACQUISITION, INFRASTRUCTURE 26 IMPROVEMENTS AND CONSTRUCTION FOR THE 27 MIDDLE STATES ASSOCIATION OF COLLEGES 28 AND SCHOOLS PROJECT 4,000,000 29 (M8) ACQUISITION, CONSTRUCTION, 30 DEMOLITION, INFRASTRUCTURE, RENOVATION 20070H1589B4129 - 258 -
1 AND OTHER RELATED COSTS FOR RED CROSS 2 HOUSE 1,500,000 3 (III) YEADON BOROUGH 4 (A) CONSTRUCTION, REDEVELOPMENT AND OTHER 5 RELATED COSTS FOR THE KERR FIELD 6 PROJECT 500,000 7 (IV) PHILADELPHIA AND MONTGOMERY COUNTIES 8 (A) ACQUISITION, CONSTRUCTION, 9 INFRASTRUCTURE AND OTHER RELATED COSTS 10 FOR COMMUNITY IMPROVEMENTS ALONG 11 CHELTENHAM AVENUE AND OGONTZ AVENUE, 12 INCLUDING ADJACENT AREAS 10,000,000 13 (52) Pike County 14 (i) County projects 15 (A) Acquisition, infrastructure, 16 rehabilitation, construction and other 17 related costs for improvements to the 18 Mt. Laurel Center for Performing Arts 600,000 19 (B) Acquisition, site development, 20 infrastructure and other related costs 21 for the construction of an expansion of 22 the Pike County Administrative 23 Facility 5,000,000 24 (C) Acquisition, infrastructure, site 25 development, construction and other 26 related costs for the development of an 27 emergency training center 5,000,000 28 (D) Acquisition, site development, 29 infrastructure and construction of a 30 juvenile detention center and youth 20070H1589B4129 - 259 -
1 shelter 5,000,000 2 (i.1) Blooming Grove Township 3 (A) Construction of an emergency services 4 training complex/911 center for 5 fire/rescue, EMS and law enforcement 6 personnel, including training tower, 7 observation command center and 8 instructional building 3,826,000 9 (ii) Milford Borough 10 (A) Infrastructure and construction of a 11 public library 1,000,000 12 (ii.1) Palmyra Township 13 (A) Acquisition, infrastructure, 14 construction and other related costs 15 for the construction of a 10,000 16 square-foot visitors center on Route 6 17 adjacent to Palmyra Township Beach 2,000,000 18 (iii) Pike County Industrial Development 19 Corporation 20 (A) Acquisition, infrastructure, site 21 development, construction and other 22 related costs for the development of 23 the Pike County Business Park 2,500,000 24 (53) Potter County 25 (i) County projects (Reserved) 26 (ii) Coudersport Borough 27 (A) Construction, renovation and 28 rehabilitation necessary for a 29 comprehensive upgrade of the facility 30 and physical plant, including expansion 20070H1589B4129 - 260 -
1 of the Emergency Department, 2 infrastructure improvements and 3 physical redesign of the long-term care 4 facility, fire safety protection 5 improvements and upgrades and 6 renovation of the dietary service 7 department at Charles Cole Memorial 8 Hospital 2,000,000 9 (iii) Potter County Redevelopment Authority 10 (A) Acquisition, infrastructure, 11 construction and other related costs 12 for the revitalization and 13 rehabilitation of downtown Galeton, 14 including facade improvements, site 15 development and facility construction 1,000,000 16 (B) Infrastructure, construction and other 17 related costs for the development of an 18 industrial park in the Borough of 19 Coudersport, including site 20 preparation, construction and on-site 21 infrastructure development 1,000,000 22 (C) Acquisition, infrastructure, 23 construction and other related costs 24 for the development of a helicopter 25 landing and maintenance facility for 26 economic development purposes related 27 to attracting corporate tenants to 28 Potter County 1,000,000 29 (54) Schuylkill County 30 (i) County projects 20070H1589B4129 - 261 -
1 (A) Acquisition, infrastructure and other 2 costs related to the construction of a 3 regional industrial park 1,000,000 4 (B) Land acquisition, infrastructure 5 improvements and construction necessary 6 to maintain the competitive position of 7 an existing business entity or for the 8 development of business-ready sites for 9 potential business tenants 10,000,000 10 (C) Acquisition, construction, 11 infrastructure and other related costs 12 for the Schuylkill Women in Crisis 13 facility 1,000,000 14 (D) Acquisition, infrastructure 15 improvements and construction for the 16 Aurora industrial building project 800,000 17 (E) Construction, infrastructure and other 18 related costs to renovate the 19 Schuylkill County Court House 500,000 20 (F) ACQUISITION, CONSTRUCTION, <-- 21 REDEVELOPMENT AND OTHER RELATED COSTS 22 FOR THE SCHUYLKILL COUNTY CHILDREN AND 23 YOUTH EXPANSION PROJECT 500,000 24 (G) ACQUISITION, CONSTRUCTION, 25 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 26 RELATED COSTS FOR A COMMUNITY 27 REVITALIZATION PROJECT IN SCHUYLKILL 28 COUNTY 1,000,000 29 (H) CONSTRUCTION, REDEVELOPMENT AND OTHER 30 RELATED COSTS FOR THE SCHUYLKILL HEALTH 20070H1589B4129 - 262 -
1 ALLIANCE 250,000 2 (ii) Coaldale Borough 3 (A) Construction, infrastructure and other 4 costs related to the renovation of the 5 Coaldale Complex 1,000,000 6 (iii) Orwigsburg Borough 7 (A) Construction, infrastructure and other 8 costs related to the renovation of the 9 Orwigsburg Memorial Hall 500,000 10 (B) Construction, infrastructure and other 11 costs related to the renovation of the 12 Orwigsburg Public Library 500,000 13 (C) Construction, infrastructure and other 14 costs related to the renovation of 15 Orwigsburg Borough Hall 500,000 16 (III.1) CITY OF POTTSVILLE <-- 17 (A) CONSTRUCTION, INFRASTRUCTURE, 18 REDEVELOPMENT AND OTHER RELATED COSTS 19 FOR THE POTTSVILLE INTERMODAL 20 TRANSPORTATION PROJECT 10,000,000 21 (iv) Tamaqua Borough 22 (A) Reconstruction of Wabash Creek storm 23 water tunnel and diversion system 5,000,000 24 (B) Repairs to the two Owl Creek dams, 25 including breast repairs and spillway 26 construction 3,000,000 27 (v) West Penn Township 28 (A) Acquisition, infrastructure and other 29 costs related to the construction of a 30 regional industrial park 1,000,000 20070H1589B4129 - 263 -
1 (55) Snyder County 2 (i) County projects (Reserved) 3 (ii) Selinsgrove Borough 4 (A) Construction of Susquehanna University 5 Science facility 15,000,000 6 (B) Renovation of Susquehanna University 7 Science Hall, including related 8 infrastructure 6,000,000 9 (56) Somerset County 10 (i) County projects 11 (A) Acquisition and construction of an 12 inpatient hospice facility by Somerset 13 Hospital, to be located in Somerset 14 Township 500,000 15 (B) Redevelopment, construction and 16 related infrastructure costs for Laurel 17 Highlands Business Park 5,000,000 18 (C) Renovations to Somerset Hospital, 19 including upgrade of pharmacy 20 facilities 1,500,000 21 (D) Acquisition, renovation, demolition 22 and construction related to the 23 development of a downtown health care 24 campus associated with Somerset 25 Hospital 1,500,000 26 (ii) Fairhope Township 27 (A) Site development, construction, 28 rehabilitation and infrastructure 29 improvements to the International 30 Conservation Center 3,000,000 20070H1589B4129 - 264 -
1 (iii) Jefferson Township 2 (A) Site development, construction and 3 infrastructure improvements to property 4 located along Route 31 10,000,000 5 (iv) Windber Borough 6 (A) Construction and other related costs 7 for expansion of Windber Medical Center 8 emergency department 1,000,000 9 (57) Sullivan County (Reserved) 10 (58) Susquehanna County (Reserved) 11 (59) Tioga County 12 (i) County projects 13 (A) Development of the Marsh Creek 14 Greenway, extending from the Borough of 15 Wellsboro to the Pine Creek Trail at 16 Wellsboro Junction 2,350,000 17 (B) Construction of a new 911/emergency 18 operations center/training facility 3,500,000 19 (C) Development of the Mill Cove 20 Environmental Education Center, 21 including infrastructure improvements 22 and construction of support facilities 1,500,000 23 (D) Acquisition, infrastructure, 24 construction and other related costs 25 for the Nature Quest Geotourism Lodge 26 and business facilities development 27 project, including the development of a 28 200-room lodge and operational 29 facilities located in Ansonia 12,500,000 30 (ii) Tioga County Development Corporation 20070H1589B4129 - 265 -
1 (A) Development of a green design (LEED) 2 industrial park along US 15 (future I- 3 99), including interchange accesses to 4 US 15 as part of the Interstate 99 5 Business Park, Phase II 7,000,000 6 (B) Renovation and rehabilitation of the 7 TCDC historic building located in the 8 Borough of Wellsboro, including 9 hazardous material abatement 750,000 10 (iii) Liberty Borough 11 (A) Replacement of a stone culvert that 12 parallels SR 2007 through Liberty 13 Borough as part of the Williamson Trail 14 Project 500,000 15 (iv) Shippen Township 16 (A) Expansion and construction of Nature 17 Quest Geotourism Lodge, including 18 acquisition and infrastructure 12,500,000 19 (v) Wellsboro Borough 20 (A) Acquisition, construction and 21 infrastructure improvements of a 22 Community Performing Arts Center 7,500,000 23 (B) Construction of the Deane Center for 24 the Performing Arts 7,500,000 25 (60) Union County 26 (i) County projects 27 (A) Development of the Bucknell University 28 Bull Run Gateway neighborhood 29 development project, including an art 30 center, parking facilities, bookstore, 20070H1589B4129 - 266 -
1 inn and business center 20,000,000
2 (ii) Kelly Township
3 (A) Expansion and renovation of
4 Evangelical Community Hospital,
5 including related infrastructure 11,000,000
6 (61) Venango County
7 (i) County projects
8 (A) Renovations and rehabilitation to the
9 Venango County Courthouse 500,000
10 (B) Infrastructure and other related costs
11 for the development of the Frenchcreek <--
12 SANDYCREEK Industrial Park, a <--
13 multitenant light industrial park 700,000
14 (C) Site development, infrastructure
15 improvements and construction of a
16 building on a designated Foreign Trade
17 Zone adjacent to the Venango Regional
18 Airport 1,000,000
19 (D) Acquisition and construction of a bike
20 trail from McClintock Well No. 1 from
21 Cornplanter Township to the City of Oil
22 City 1,200,000
23 (ii) Emlenton Borough
24 (A) Acquisition, site development and
25 construction to support revitalization
26 in Emlenton Borough 500,000
27 (iii) City of Oil City
28 (A) Renovations, construction and
29 expansion of the Oil City YMCA 1,500,000
30 (B) Renovations, new construction and
20070H1589B4129 - 267 -
1 rehabilitation of the Cornplanter 2 Square building and the Brody Block 7,500,000 3 (62) Warren County 4 (i) County projects 5 (A) Infrastructure, site development, 6 rehabilitation, construction and other 7 costs related to the expansion of the 8 telecommunications infrastructure 9 within and throughout northwest 10 Pennsylvania to allow for business 11 retention, expansion and recruitment 5,000,000 12 (ii) Pine Grove Township 13 (A) Construction of 12 independent living 14 units, including site work and 15 infrastructure improvements at Warren 16 General Hospital 1,025,000 17 (iii) City of Warren 18 (A) Acquisition of imaging equipment, 19 electronic medical record systems 20 software and an infant abduction 21 security system at Warren General 22 Hospital 575,000 23 (B) Renovation and expansion of existing 24 facility for medical offices at Warren 25 General Hospital 1,350,000 26 (C) Renovation and expansion of the 27 critical care inpatient unit at Warren 28 General Hospital 1,250,000 29 (D) Infrastructure, construction and other 30 related costs for the Warren downtown 20070H1589B4129 - 268 -
1 economic development project, including 2 comprehensive and interrelated public 3 infrastructure improvements and 4 enhancements to street corridors in the 5 downtown central business district 2,500,000 6 (E) Acquisition, infrastructure, 7 redevelopment and other related costs 8 for the construction of a new hotel and 9 convention center on Warren's 10 riverfront as part of the ambitious 11 Impact Warren redevelopment initiative 3,000,000 12 (63) Washington County 13 (i) County projects (Reserved) 14 (ii) Allenport Borough 15 (A) Acquisition, construction, 16 infrastructure and other related costs 17 to restore the Barge Shipping facility 1,250,000 18 (ii.1) Bentleyville Borough 19 (A) Acquisition, infrastructure 20 improvements and reconstruction of 21 historic buildings 500,000 22 (B) Construction and expansion of the 23 Bentworth Senior Center 1,000,000 24 (ii.2) Brownsville Township 25 (A) Construction and other related costs 26 for equipment upgrades and renovation 27 of the Brownsville Hospital 10,000,000 28 (iii) California Borough 29 (A) Acquisition, construction, 30 infrastructure and other related costs 20070H1589B4129 - 269 -
1 for the California Technology Park film 2 industry project 1,250,000 3 (B) CONSTRUCTION AND OTHER RELATED COSTS <-- 4 FOR A COMMUNITY RECREATION AND WELLNESS 5 CENTER 500,000 6 (iv) Canonsburg Borough 7 (A) Construction, infrastructure and other 8 related costs for the Town Park 9 project 940,000 10 (B) Infrastructure improvements and 11 construction, including roadway 12 connection for Southpoint II project 2,000,000 13 (C) Infrastructure and other related costs 14 for the Fort Pitt Bridgeworks Business 15 Park 2,500,000 16 (iv.1) Canton Township 17 (A) Acquisition, infrastructure 18 improvements, renovations, construction 19 and other related costs for Jessop 20 Place 1,000,000 21 (v) Carroll Township 22 (A) Construction and other related costs 23 for the Monongahela Valley Hospital 24 upgrade project 3,000,000 25 (vi) Cecil Township 26 (A) Construction and development of 27 recreation complex near Muse School 28 property 500,000 29 (B) Infrastructure improvements and 30 construction for Southpoint II project 4,000,000 20070H1589B4129 - 270 -
1 (vi.1) Charleroi Borough 2 (A) Construction and other costs related 3 to the Coyle Theater rehabilitation 4 project 1,400,000 5 (B) Construction, infrastructure, 6 redevelopment and other related costs 7 for the River Room Conference and 8 Events Center 1,300,000 9 (vii) Chartiers Township 10 (A) Construction and other related costs 11 for the Chartiers Township community 12 center 500,000 13 (B) Land acquisition and development of 14 Chartiers Township recreation complex 5,000,000 15 (C) Infrastructure improvements and 16 construction of Pennsylvania Trolley 17 Museum Visitor's Center 8,000,000 18 (viii) City of Washington 19 (A) Construction and other related costs 20 for the Crossroads Amphitheater 1,000,000 21 (B) Construction and other related costs 22 for the redevelopment of Main and 23 Maiden Streets 15,000,000 24 (C) Improvements to the Washington Park 25 recreation facility 1,250,000 26 (D) Construction and other related costs 27 for the Main Street Works Project 12,500,000 28 (E) Acquisition of land and construction 29 of a police/fire safety building 30 complex 3,000,000 20070H1589B4129 - 271 -
1 (F) Construction of Washington and 2 Jefferson College multiuse economic 3 development facility 4,000,000 4 (G) Construction of the Washington 5 Hospital expansion project 10,000,000 6 (H) Acquisition, demolition and 7 construction for the Wheeling Street 8 Revitalization project 4,000,000 9 (I) Infrastructure improvements and 10 construction of the Leymone Center 11 improvement project 2,000,000 12 (J) Acquisition, construction, 13 infrastructure, redevelopment, 14 abatement of hazardous materials and 15 other costs related to Phase II of the 16 Crossroads Project 5,000,000 17 (ix) Cross Creek Township 18 (A) Construction and other related costs 19 for the Cedar Grove 20 community/recreation project 500,000 21 (x) Fallowfield Township 22 (A) Construction, infrastructure, 23 acquisition and other costs related to 24 the Shell Building and supporting 25 infrastructure in Alta Vista Business 26 Park 1,250,000 27 (x.1) Jefferson Township 28 (A) Infrastructure improvements and 29 construction for the Meadowcroft 30 Rockshelter and Museum of Rural Life 2,000,000 20070H1589B4129 - 272 -
1 (X.2) CITY OF MONONGAHELA <-- 2 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 3 RELATED COSTS FOR THE AQUATORIUM 4 PROJECT 435,000 5 (xi) Mount Pleasant Township 6 (A) Construction and other related costs 7 for the Hickory Main Street 8 revitalization 500,000 9 (xii) North Franklin Township 10 (A) Construction and other related costs 11 for a new municipal office/community 12 building 3,000,000 13 (B) Acquisition, construction, 14 infrastructure and other costs related 15 to the Washington County 16 Airport/Skypointe Business Park 2,000,000 17 (xiii) North Strabane Township 18 (A) Construction and other related costs 19 for the North Strabane Township 20 community/recreation center 1,000,000 21 (B) Acquisition, expansion, renovation, 22 construction and infrastructure 23 improvements for the Canonsburg General 24 Hospital campus 10,000,000 25 (xiv) Roscoe Borough 26 (A) Construction, infrastructure and other 27 related costs for community park 28 improvements 500,000 29 (xiv.1) South Franklin Township 30 (A) Acquisition, infrastructure 20070H1589B4129 - 273 -
1 improvements and construction for 2 Skypointe industrial and business park 5,000,000 3 (B) Construction and infrastructure 4 improvements for the mixed-use office 5 and industrial, residential and 6 commercial developments along the Route 7 18 South corridor 5,000,000 8 (xv) South Strabane Township 9 (A) Construction, infrastructure and other 10 related costs for the Zediker Station 11 Business Park 5,000,000 12 (B) Construction and other related costs 13 for a police and road department 14 facility 875,000 15 (C) Infrastructure improvements and 16 construction for the Meadowlands 17 Interchange rehabilitation project 5,000,000 18 (xvi) Union Township 19 (A) Infrastructure, redevelopment, 20 abatement of hazardous materials and 21 other costs related to the Phoenix 22 Business Park 1,000,000 23 (xvii) Washington Borough 24 (A) Construction, infrastructure, 25 acquisition and other related costs to 26 build a Washington Community Health 27 Center 1,500,000 28 (64) Wayne County 29 (i) County projects 30 (A) Renovations of athletic fields and 20070H1589B4129 - 274 -
1 surrounding infrastructure at the 2 Western Wayne School District 500,000 3 (B) Infrastructure, technological 4 equipment upgrades and construction of 5 an emergency management and 911 center 2,250,000 6 (i.1) Hawley Borough 7 (A) Acquisition, infrastructure and other 8 costs related to the construction of a 9 medical campus 1,800,000 10 (65) Westmoreland County 11 (i) County projects 12 (A) Design and construction of a 22,000- 13 square-foot history and education 14 center at the historic Hanna's Town 3,000,000 15 (B) Infrastructure, construction and other 16 related costs for the renovation and 17 rehabilitation of the Laurel Mountain 18 Ski Resort facilities 1,500,000 19 (C) Westmoreland Cultural Trust 20 (I) Acquisition and rehabilitation of 21 a structure in downtown Latrobe for 22 the purposes of commercial reuse 23 and development of a downtown 24 destination spot as part of the 25 Latrobe Train Station project 1,000,000 26 (II) Renovations and rehabilitation to 27 the historical Union Trust 28 building 1,000,000 29 (III) Acquisition and rehabilitation 30 of a structure in the downtown area 20070H1589B4129 - 275 -
1 of West Newton for the West Newton 2 Cultural Center 1,000,000 3 (IV) Acquisition, rehabilitation and 4 renovations to the historical 5 Greensburg Cargo Train Station, 6 including the acquisition of 7 adjacent properties or structures, 8 for the purpose of placing the 9 station back into productive 10 commercial use 3,000,000 11 (V) Acquisition, infrastructure, 12 construction and other related 13 costs for the construction of a 14 175-unit parking garage as part of 15 the Greensburg Parking Garage 16 project 3,000,000 17 (VI) Construction of a railway tunnel 18 extension underneath Norfolk 19 Southern right-of-way, to connect 20 existing tunnel and Trust property 21 at the Greensburg train station to 22 allow pedestrian access to and from 23 Seton Hill University 500,000 24 (D) Westmoreland County Community College 25 (I) Infrastructure, construction and 26 other related costs for the 27 construction of a workforce and 28 economic development training 29 center, located in New Kensington 3,700,000 30 (II) Infrastructure, construction and 20070H1589B4129 - 276 -
1 other related costs for the
2 construction of a workforce and
3 economic development training
4 center, located in Youngwood 3,700,000
5 (III) Infrastructure, construction and
6 other related costs to the
7 expansion of the Public Safety
8 Training Center 3,750,000
9 (E) ACQUISITION, INFRASTRUCTURE, <--
10 REDEVELOPMENT AND CONSTRUCTION COSTS
11 FOR A MEDICAL SCHOOL 5,000,000
12 (F) CONSTRUCTION AND RELATED COSTS FOR A
13 RENEWABLE ENERGY PLANT 4,500,000
14 (G) CONSTRUCTION OF FACILITIES FOR
15 ADELPHOI VILLAGE, INCLUDING RELATED
16 COSTS 1,500,000
17 (H) INFRASTRUCTURE, CONSTRUCTION AND OTHER
18 RELATED COSTS FOR THE RIVER FOREST
19 DEVELOPMENT PROJECT 900,000
20 (I.1) ALLEGHENY TOWNSHIP
21 (A) CONSTRUCTION AND OTHER RELATED COSTS
22 FOR THE COPELAND ROAD BRIDGE PROJECT AT
23 CHARTIERS RUN CREEK 250,000
24 (i.1) (I.2) Derry Township <--
25 (A) Acquisition, infrastructure,
26 construction and other related costs
27 for the construction of a new firehouse
28 for the Bradenville Volunteer Fire
29 Department 600,000
30 (ii) City of Greensburg
20070H1589B4129 - 277 -
1 (A) Construction and other costs related <-- 2 to construction of a medical school at 3 Seton Hill University 15,000,000 4 (A) CONSTRUCTION AND OTHER COSTS RELATED <-- 5 TO SETON HALL UNIVERSITY CAMPUS 6 EXPANSION AND IMPROVEMENTS, INCLUDING, 7 BUT NOT LIMITED TO, CONSTRUCTION OF A 8 MEDICAL SCHOOL 15,000,000 9 (B) Acquisition, construction, 10 infrastructure and other related costs 11 for Greensburg Downtown revitalization 5,000,000 12 (C) Acquisition, construction, 13 infrastructure and other related costs 14 for the Westmoreland County Community 15 College Sports and Recreation Facility 6,000,000 16 (D) Renovation of the science laboratories 17 located on the Seton Hill University 18 campus 1,000,000 19 (E) Renovations and expansion of the 20 student center facilities located on 21 the Seton Hill University campus 1,000,000 22 (F) Acquisition, infrastructure, design, 23 redevelopment and construction-related 24 costs for the expansion of the 25 Westmoreland Museum of American Art 1,250,000 26 (G) Acquisition, infrastructure, design, 27 redevelopment and construction-related 28 costs for the total rehabilitation of a 29 building in the downtown district of 30 Greensburg 2,500,000 20070H1589B4129 - 278 -
1 (H) Acquisition, infrastructure, design, 2 redevelopment and construction-related 3 costs for capital improvements and 4 redevelopment of cultural, historic and 5 downtown districts of the City of 6 Greensburg 2,500,000 7 (I) Acquisition, infrastructure, 8 redevelopment, construction and other 9 costs related to the Westmoreland Human 10 Services new Pathways Permanent 11 Supportive Housing Program 500,000 12 (ii.1) Hempfield Township 13 (A) Acquisition, construction, 14 infrastructure and other related costs 15 to expand Green Forge 750,000 16 (ii.2) City of Jeannette 17 (A) Acquisition, infrastructure, 18 redevelopment and construction of a 19 15,000-square-foot community building, 20 including parking facilities 500,000 21 (iii) Latrobe Borough 22 (A) Renovation and expansion of St. 23 Vincent College facilities 15,000,000 24 (B) CONSTRUCTION AND OTHER RELATED COSTS <-- 25 FOR IMPROVEMENTS AT THE FRED ROGERS 26 CENTER AT SAINT VINCENT COLLEGE 400,000 27 (III.1) CITY OF LOWER BURRELL 28 (A) ACQUISITION AND CONSTRUCTION FOR THE 29 REVITALIZATION OF LOWER BURRELL 30 SHOPPING CENTER 9,300,000 20070H1589B4129 - 279 -
1 (iii.1) (III.2) City of Monessen <-- 2 (A) Acquisition, infrastructure 3 improvements and construction of the 4 City of Monessen Municipal Building 5 Complex 5,000,000 6 (iii.2) (III.3) City of New Kensington <-- 7 (A) Renovation, rehabilitation and 8 construction of the downtown central 9 business district 2,000,000 10 (B) Acquisition, renovations, construction 11 and infrastructure improvements for 12 River Line project 10,000,000 13 (C) Acquisition, renovations, construction 14 and infrastructure improvements of the 15 Citizens Ambulatory Care Center 5,000,000 16 (D) Construction and other related costs 17 for the Alle-Kiski Education Center 2,500,000 18 (E) Acquisition, infrastructure, 19 renovation and rehabilitation of the 20 core area of the central business 21 district from the railroad tracks to 22 Industrial Boulevard and from 12th 23 Street to 7th Street 2,000,000 24 (III.4) ROSTRAVER TOWNSHIP <-- 25 (A) CONSTRUCTION, INFRASTRUCTURE, 26 REDEVELOPMENT AND OTHER RELATED COSTS 27 FOR THE ROSTRAVER BUSINESS PARK 28 DEVELOPMENT PROJECT 10,000,000 29 (iv) Scottdale Borough 30 (A) Acquisition, construction, renovations 20070H1589B4129 - 280 -
1 and other costs related to the 2 Scottdale Bank Building project 1,000,000 3 (B) Acquisition, construction, renovations 4 and other costs related to the 5 Scottdale Bank Building project 1,000,000 6 (iv.1) Trafford Borough 7 (A) Construction and other costs related 8 to the Trafford Borough Soccer Complex 9 facility 3,600,000 10 (B) ACQUISITION AND CONSTRUCTION OF A NEW <-- 11 PUBLIC SAFETY, COMMUNITY AND SENIOR 12 CITIZEN BUILDING, INCLUDING PARKING 625,000 13 (iv.2) Unity Township 14 (A) Renovation and expansion of facilities 15 for the Herbert W. Boyer School of 16 Natural Science, Mathematics, and 17 Computing, including construction, at 18 St. Vincent College 15,000,000 19 (B) Acquisition, renovations and 20 construction of a streetscape project 21 in conjunction with design proposal 22 near U.S. Route 30 and SR 981, Smart 23 Growth Partnership of Westmoreland 24 County 3,500,000 25 (v) Upper Burrell Township 26 (A) Acquisition, construction, 27 infrastructure and other related costs 28 of a manufacturing campus 5,000,000 29 (v.1) Vandergrift Borough 30 (A) Acquisition, construction and other 20070H1589B4129 - 281 -
1 costs related to the Vandergrift 2 redevelopment project 10,000,000 3 (vi) Youngwood Borough 4 (A) Construction, redevelopment and other 5 costs related to the renovation of the 6 Westmoreland County Community College 7 Baseball Stadium 2,500,000 8 (vii) Westmoreland County Industrial 9 Development Corporation 10 (A) Infrastructure, construction and other 11 related costs for the Phase II 12 development of the Westmoreland County 13 Airpark 1,000,000 14 (B) Infrastructure and construction costs 15 for the development of a parcel of land 16 located in the Westmoreland 17 Distribution Park East 1,500,000 18 (C) Infrastructure, construction and 19 renovation of the Westmoreland County 20 Community College baseball stadium 3,000,000 21 (D) Acquisition, infrastructure, 22 construction and other related costs 23 for the development of a 114-acre 24 parcel of land located along SR 1053 25 directly opposite the Westmoreland 26 County Industrial Park I 3,000,000 27 (E) Site development, infrastructure, 28 construction and other related costs 29 for the Respironics Headquarters Campus 30 project located at the Westmoreland 20070H1589B4129 - 282 -
1 Business and Research Park, including 2 the development of a new manufacturing 3 campus 500,000 4 (66) Wyoming County 5 (i) County projects (Reserved) 6 (ii) Tunkhannock Township 7 (A) Infrastructure, construction and 8 renovations to the Tyler Memorial 9 Hospital, including expansion of 10 imaging department, emergency 11 department and outpatient registration 12 area 6,250,000 13 (67) York County 14 (i) County projects 15 (A) Infrastructure, equipment and 16 construction of a Civil War era 17 excursion rail line and historic 18 experience to be known as Steam into 19 History 1,000,000 20 (B) Acquisition, construction and other 21 related costs for a community college 22 campus development in York County 15,000,000 23 (ii) City of York 24 (A) Construction, infrastructure, 25 abatement of hazardous materials and 26 other costs related to the Government 27 Center Renovation Project 8,500,000 28 (B) Acquisition, construction, 29 infrastructure and other related costs 30 for downtown community college campus 7,000,000 20070H1589B4129 - 283 -
1 (C) Construction, acquisition, 2 redevelopment, abatement of hazardous 3 materials and other costs related to 4 the Downtown York Historic Preservation 5 and Revitalization Project 9,000,000 6 (D) Acquisition, construction, 7 infrastructure, redevelopment and other 8 costs related to the York Museum of 9 Art, Cultural Center and Central Market 10 upgrades 22,000,000 11 (E) ACQUISITION, CONSTRUCTION, <-- 12 INFRASTRUCTURE AND OTHER COSTS RELATED 13 TO THE YORK COUNTY TECHNOLOGY CENTER 10,000,000 14 (F) REDEVELOPMENT AND OTHER RELATED COSTS 15 FOR SOUTH GEORGE STREET 2,000,000 16 (ii.1) City of York and Spring Garden Township 17 (A) Acquisition, infrastructure, 18 redevelopment and other costs related 19 to the York College West Campus 20 rehabilitation project 4,000,000 21 (ii.2) Red Lion Borough 22 (A) Streetscape improvements, including 23 necessary costs 1,550,000 24 (iii) Springettsbury Township 25 (A) Construction, infrastructure, 26 abatement of hazardous materials and 27 other costs associated with the 28 Pleasant Acres Renovation Project 11,250,000 29 (B) Construction of a facility to house a 30 youth development center 13,500,000 20070H1589B4129 - 284 -
1 (iv) West Manheim Township
2 (A) Redevelopment of South Western
3 Elementary School for use as township
4 administrative offices, including
5 construction and related
6 infrastructure 2,000,000
7 (v) York Township
8 (A) Acquisition, infrastructure and
9 renovations for the development of
10 personal care homes for the elderly 1,000,000
11 (68) Multiple Counties
12 (i) Butler and Mercer Counties
13 (A) Slippery Rock and Liberty Townships
14 (I) Acquisition and development of
15 Slippery Rock Business Park,
16 including related infrastructure 1,250,000
17 (B) Community Development Corporation of
18 Butler County
19 (I) Acquisition, infrastructure,
20 construction and development of
21 Phase I of the Slippery Rock
22 Business Park II 1,250,000
23 (ii) Erie, McKean and Warren, WARREN, <--
24 CRAWFORD, VENANGO AND CLARION Counties
25 (A) City of Corry Redevelopment Authority
26 (I) Infrastructure, construction and
27 other related costs for the
28 installation of SONET-based fiber
29 optic telecommunications
30 infrastructure along the Route 6
20070H1589B4129 - 285 -
1 corridor between Union City, Erie 2 County, and Coudersport, Potter 3 County 4,250,000 4 (iii) Luzerne and Schuylkill Counties 5 (A) County projects 6 (I) Acquisition, construction, 7 infrastructure and other related 8 costs for the development of a 9 cargo airport 250,000,000 10 (iv) Snyder and Union Counties 11 (A) County projects 12 (I) Acquisition, construction, 13 infrastructure and other related 14 costs for the Greater Susquehanna 15 Valley YMCA 3,000,000 16 (v) Montour, Northumberland, Snyder and Union 17 Counties 18 (A) County projects 19 (I) Construction, renovations and 20 other related costs for a new 21 innovation center 3,000,000 22 (vi) Westmoreland and Allegheny Counties 23 (A) Trafford Borough 24 (I) Construction, site preparation, 25 renovations, upgrades, 26 infrastructure improvements for 27 development of commercial space at 28 the Trafford Commerce Center 4,000,000 29 (vii) Carbon and Monroe Counties 30 (A) Pocono Region 20070H1589B4129 - 286 -
1 (I) Pocono Mountains Wayfinding 2 Signing program 1,000,000 3 (viii) Montgomery and Philadelphia Counties 4 (A) Engineering and construction of 5 Cresheim Multiuse Trail between Valley 6 Green in Fairmount Park in Philadelphia 7 and Fort Washington State Park 2,500,000 8 (ix) Lawrence and Beaver Counties 9 (A) Infrastructure improvements and 10 construction of a National Character 11 Education Foundation training 12 headquarters 6,000,000 13 (x) Carbon and Lehigh Counties 14 (A) Construction, infrastructure, 15 redevelopment and other related costs 16 for the Lehigh Gap Nature Center 17 expansion 1,500,000 18 (XI) CENTRE, CLINTON, LYCOMING, SULLIVAN, <-- 19 LUZERNE, COLUMBIA, MONTOUR, NORTHUMBERLAND, 20 UNION AND SNYDER COUNTIES 21 (A) ACQUISITION, CONSTRUCTION AND OTHER 22 RELATED COSTS FOR RENEWABLE ENERGY 23 TERMINAL AND DISTRIBUTION CENTER 24 REQUIRED FOR THE LYCO 1, LLC'S 25 RENEWABLE ENERGY TERMINAL PROJECT 5,000,000 26 (B) ACQUISITION, CONSTRUCTION AND OTHER 27 RELATED COSTS FOR CELLULOSE STORAGE 28 SITES AND RENEWABLE ENERGY FACILITIES 29 FOR LYCO 1 LLC'S CELLULOSE ETHANOL 30 MANUFACTURING PROJECT 35,000,000 20070H1589B4129 - 287 -
1 Section 7. Itemization of flood control projects. 2 Additional capital projects in the category of flood control 3 projects to be constructed by the Department of Environmental 4 Protection, its successors or assigns, and to be financed by the 5 incurring of debt are hereby itemized, together with their 6 respective estimated costs, as follows: 7 Total 8 Project 9 Project Allocation 10 (1) Department of Environmental Protection 11 (i) Allegheny County 12 (A) Construction, infrastructure, 13 abatement of hazardous materials and 14 other costs related to the North Hills 15 flood prevention project 2,000,000 16 (B) Construction, infrastructure and other 17 related costs for the Penn Hills 18 stormwater management project 1,200,000 19 (C) ADDITIONAL FUNDS FOR THE GIRTYS RUN <-- 20 FEDERAL FLOOD PROTECTION PROJECT IN THE 21 BOROUGH OF MILLVALE AND SHALER AND ROSS 22 TOWNSHIPS 3,600,000 23 (BASE PROJECT ALLOCATION - $3,000,000) 24 (DESIGN AND CONTINGENCIES - $600,000) 25 (D) ADDITIONAL FUNDS FOR THE PINE CREEK 26 FEDERAL FLOOD PROTECTION PROJECT IN 27 ETNA BOROUGH AND SHALER TOWNSHIP 3,600,000 28 (BASE PROJECT ALLOCATION - $3,000,000) 29 (DESIGN AND CONTINGENCIES - $600,000) 30 (E) ADDITIONAL FUNDS FOR THE SAW MILL RUN 20070H1589B4129 - 288 -
1 FEDERAL FLOOD PROTECTION PROJECT IN THE 2 CITY OF PITTSBURGH 3,600,000 3 (BASE PROJECT ALLOCATION - $3,000,000) 4 (DESIGN AND CONTINGENCIES - $600,000) 5 (F) PINE CREEK WATERSHED, STORMWATER 6 MANAGEMENT AND FLOOD PROTECTION FOR 7 LOWER ALLISON PARK 4,623,000 8 (i.1) Blair County 9 (A) Construction, infrastructure and other 10 related costs for the Mill Run 11 Rehabilitation Project 76,000 12 (i.2) Carbon County 13 (A) Construction, infrastructure and other 14 related costs for the Towamensing 15 Trails Dam rehabilitation project 1,250,000 16 (ii) Chester County 17 (A) Construction, infrastructure and other 18 related costs for the Business 30 Flood 19 Control Project 900,000 20 (ii.1) Clearfield County 21 (A) Construction, infrastructure and other 22 related costs for flood protection 23 projects in Chester Hill Borough 3,000,000 24 (B) Construction, infrastructure and other 25 related costs for flood protection 26 projects in Coalport Borough 300,000 27 (ii.2) Clinton County 28 (A) Pine Creek Township, construction, 29 redevelopment and other costs related 30 to the Chatham Run levee project 7,500,000 20070H1589B4129 - 289 -
1 (iii) Columbia County 2 (A) Fishing Creek Flood Control Project, 3 including gravel bar removal 1,000,000 4 (iv) Crawford County 5 (A) Conneautville Dam rehabilitation 750,000 6 (iv.1) Derry Township 7 (A) Stormwater control project in Derry 8 Township 8,000,000 9 (B) Stormwater control project in Lower 10 Swatara Township 6,000,000 11 (iv.2) Indiana County 12 (A) Acquisition and construction of a 13 flood control project designed by the 14 Army Corps of Engineers 2,000,000 15 (IV.3) LACKAWANNA COUNTY <-- 16 (A) ADDITIONAL FUNDS FOR THE GREENRIDGE 17 PORTION OF THE SCRANTON FEDERAL FLOOD 18 PROTECTION PROJECT IN THE CITY OF 19 SCRANTON 6,000,000 20 (BASE PROJECT ALLOCATION - $5,000,000) 21 (DESIGN AND CONTINGENCIES - $1,000,000) 22 (v) Monroe County 23 (A) Additional funds to refurbish Brady's 24 Lake Dam 3,600,000 25 (B) Flood control project in Paradise 26 Township 1,500,000 27 (v.1) Montgomery County 28 (A) Construction, infrastructure and other 29 related costs for the Jenkintown flood 30 control project 1,200,000 20070H1589B4129 - 290 -
1 (vi) Northumberland County 2 (A) Construction, infrastructure and other 3 related costs for the Susquehanna River 4 Clearing and Grubbing Project 200,000 5 (B) Construction, infrastructure and other 6 related costs for the Reagan Street 7 Underpass Flooding Abatement Project 2,200,000 8 (C) Shoreline stabilization for flood 9 control system in Sunbury Borough 750,000 10 (vi.1) Potter County 11 (A) Repair and rehabilitation of the North 12 Fork Dam 2,000,000 13 (vii) Schuylkill County 14 (A) Repairs to the two Owl Creek dams, 15 including breast repairs and spillway 16 construction in Borough of Tamaqua 3,000,000 17 (B) Reconstruction of Wabash Creek storm 18 water tunnel and diversion system in 19 Borough of Tamaqua 5,000,000 20 (C) Construction, infrastructure and other 21 costs related to Klingertown flood 22 control 8,100,000 23 (viii) Somerset County 24 (A) Construction, infrastructure and other 25 related costs for the East Main Street 26 Flood Protection Project 5,000,000 27 (ix) Washington County 28 (A) Reconstruction and stabilization of 29 Canonsburg Dam, including spillway and 30 breast works 8,000,000 20070H1589B4129 - 291 -
1 (X) WESTMORELAND COUNTY <--
2 (A) CONSTRUCTION AND OTHER RELATED COSTS
3 FOR A FLOOD CONTROL PROJECT AT LITTLE
4 PUKETA CREEK ON STATE ROUTE 56,
5 INCLUDING CREEK BASIN DREDGING AND BANK
6 STABILIZATION 250,000
7 Section 8. Itemization of Keystone Recreation, Park and
8 Conservation Fund projects.
9 Projects in the category of public improvement projects to be
10 constructed by the Department of Conservation and Natural
11 Resources, its successors or assigns, and to be financed by
12 current revenues of the Keystone Recreation, Park and
13 Conservation Fund are hereby itemized, together with their
14 respective estimated costs, as follows:
15 Total
16 Project
17 Project Allocation
18 (1) Department of Conservation and Natural
19 Resources
20 (I) BALD EAGLE STATE PARK <--
21 (A) PROVIDE FURNITURE AND EQUIPMENT FOR
22 THE INN AT BALD EAGLE 400,000
23 (I.1) BELTZVILLE STATE PARK
24 (A) REPAIR THE SEWAGE SYSTEM TO REDUCE
25 INFILTRATION 400,000
26 (i) (I.2) Black Moshannon State Park <--
27 (A) Rehabilitate dam spillway and boat
28 launch 400,000
29 (Base Project Allocation - $400,000)
30 (ii) Blue Knob State Park
20070H1589B4129 - 292 -
1 (A) Rehabilitate park facilities 900,000 2 (Base Project Allocation - $900,000) 3 (B) Rehabilitate day use area 1,000,000 4 (Base Project Allocation - $1,000,000) 5 (iii) Caledonia State Park 6 (A) Replace two bridges on main park road 600,000 7 (Base Project Allocation - $600,000) 8 (B) Rehabilitate park campgrounds 1,100,000 9 (Base Project Allocation - $1,100,000) 10 (iv) Codorus State Park 11 (A) Provide paving in park 350,000 12 (Base Project Allocation - $350,000) 13 (IV.1) COWANS GAP STATE PARK <-- 14 (A) REPLACE MAIN PARK ROAD BRIDGE OVER 15 SOUTH BRANCH LITTLE AUGHWICK CREEK 250,000 16 (IV.2) DELAWARE CANAL STATE PARK 17 (A) REPAIR SMITHTOWN 5 BRIDGE 400,000 18 (B) REPAIR PAUNACUSSING CREEK CANAL WALL 150,000 19 (v) Denton Hill State Park 20 (A) Replace main park road/parking area 400,000 21 (Base Project Allocation - $400,000) 22 (vi) Forest District 19 23 (A) Rehabilitate Egypt Meadows Dam 750,000 24 (Base Project Allocation - $750,000) 25 (vii) Forest District 20 26 (A) Provide new resource management 27 center 4,000,000 28 (Base Project Allocation - $4,000,000) 29 (VII.1) GIFFORD PINCHOT STATE PARK <-- 30 (A) REHABILITATE THE CAMP AREA WASHHOUSE 750,000 20070H1589B4129 - 293 -
1 (VII.2) GREENWOOD FURNACE STATE PARK 2 (A) PAVE ROADS IN THE CAMPGROUND 160,000 3 (viii) Little Pine State Park 4 (A) Renovate restroom and lower picnic 5 area 300,000 6 (Base Project Allocation - $300,000) 7 (VIII.1) MORAINE STATE PARK <-- 8 (A) REPLACE DRAINAGE AND REPAVE ROAD NO. 9 10050, NORTH SHORE 220,000 10 (ix) Moshannon State Forest 11 (A) Provide cleanup to Quehanna reactor 12 site 2,400,000 13 (Base Project Allocation - $2,400,000) 14 (IX.1) NOCKAMIXON STATE PARK <-- 15 (A) REPLACE BOAT RENTAL DOCK WITHIN THE 16 PARK 300,000 17 (B) PAVE MAIN LOOP ROAD AND SPURS AT THE 18 MODERN CABIN COLONY 200,000 19 (IX.2) OHIOPYLE STATE PARK 20 (A) CONSTRUCT SHOWER HOUSE AT MITCHELL 21 FIELD FOR BOATERS 650,000 22 (IX.3) PINE GROVE FURNACE STATE PARK 23 (A) REHABILITATE AND REPAVE PARK ROADS AND 24 PARKING LOTS WITHIN THE PARK 200,000 25 (IX.4) PRESQUE ISLE STATE PARK 26 (A) REPLENISH BEACH SAND MOUNDS, PHASE 3 160,000 27 (IX.5) REGIONAL PARK/FOREST DISTRICT 13 OFFICE 28 (A) EXPAND PARKING AND RENOVATE OFFICE 29 FACILITIES 400,000 30 (x) Prince Gallitzin State Park 20070H1589B4129 - 294 -
1 (A) Replace two restrooms at the park 300,000 2 (Base Project Allocation - $300,000) 3 (B) Pave roads within the park 350,000 4 (Base Project Allocation - $350,000) 5 (xi) Reeds Gap State Park 6 (A) Relocate park office building 1,500,000 7 (Base Project Allocation - $1,500,000) 8 (B) Replace existing swimming pool 1,000,000 9 (Base Project Allocation - $1,000,000) 10 (XI.1) RICKETTS GLEN STATE PARK <-- 11 (A) REPAIR SEWAGE TREATMENT PLANT AND 12 WATER SYSTEM TO COMPLY WITH MODERN 13 CODES 550,000 14 (xii) S.B. Elliott State Park 15 (A) Provide ADA cabins and renovate 16 washhouse 1,250,000 17 (Base Project Allocation - $1,250,000) 18 (xiii) Shawnee State Park 19 (A) Repair joints in concrete spillway 300,000 20 (Base Project Allocation - $300,000) 21 (B) PROVIDE FOR EMERGENCY SPILLWAY <-- 22 CONCRETE AND JOINT REPAIR AT THE DAM 300,000 23 (xiv) Shikellamy State Park 24 (A) Project (PW 4182) to provide dock 25 rehabilitation transient and launch 26 areas 663,000 27 (Base Project Allocation - $663,000) 28 (B) Renovate overlook road in the park 400,000 29 (Base Project Allocation - $400,000) 30 (xv) Sinnemahoning State Park 20070H1589B4129 - 295 -
1 (A) Repair dam spillway 650,000 2 (Base Project Allocation - $650,000) 3 (XV.1) TIADAGHTON STATE FOREST <-- 4 (A) CONSTRUCT GRADE CROSSING FOR PINE 5 CREEK TRAIL AT JERSEY SHORE 250,000 6 (xvi) Various Parks and Forest Districts, 7 Statewide 8 (A) Acquire land to be incorporated within 9 the park system according to the 10 Commonwealth's master plan 10,000,000 11 (Land Allocation - $10,000,000) 12 Section 9. Itemization of Environmental Stewardship Fund 13 projects. 14 Projects in the category of public improvement projects to be 15 constructed by the Department of Conservation and Natural 16 Resources, its successors or assigns and to be financed by 17 current revenues of the Environmental Stewardship Fund are 18 hereby itemized together with their respective estimated 19 financial costs as follows: 20 Total 21 Project 22 Project Allocation 23 (1) Department of Conservation and Natural 24 Resources 25 (i) Bald Eagle State Park 26 (A) Rehabilitate roads within the park 1,600,000 27 (Base Project Allocation - $1,600,000) 28 (B) Replace courtesy docks at eight public 29 boat launches 300,000 30 (Base Project Allocation - $300,000) 20070H1589B4129 - 296 -
1 (C) Rehabilitate office and visitors' 2 center 1,750,000 3 (Base Project Allocation - $1,750,000) 4 (D) CONSTRUCT RUSTIC INN WITHIN THE PARK 5,600,000 <-- 5 (ii) Beltzville State Park 6 (A) Rehabilitate sewage treatment plant 7 and correct sewer line infiltration 400,000 8 (Base Project Allocation - $400,000) 9 (iii) Bendigo State Park 10 (A) Replace bathhouse, lifeguard station 11 and day use restrooms in the park 1,000,000 12 (Base Project Allocation - $1,000,000) 13 (iv) Canoe Creek State Park 14 (A) Rehabilitate sewage treatment plant 300,000 15 (Base Project Allocation - $300,000) 16 (v) Chapman State Park 17 (A) Rehabilitate beach house and comfort 18 station 1,900,000 19 (Base Project Allocation - $1,900,000) 20 (vi) Cherry Springs State Park 21 (A) Replace pit latrines with flush 22 restrooms and sewers 770,000 23 (Base Project Allocation - $770,000) 24 (vii) Clear Creek State Park 25 (A) Rehabilitate water system and replace 26 pit latrines 2,000,000 27 (Base Project Allocation - $2,000,000) 28 (B) Rehabilitate park roads and bridges 1,500,000 29 (Base Project Allocation - $1,500,000) 30 (VII.1) CODORUS STATE PARK <-- 20070H1589B4129 - 297 -
1 (A) REPLACE SWIMMING POOL AND RENOVATE 2 BATHHOUSE INTERIOR 2,600,000 3 (viii) Colonel Denning State Park 4 (A) Provide new day restroom, sewage and 5 shower house 350,000 6 (Base Project Allocation - $350,000) 7 (B) Provide bathhouse, concession, 8 restroom and sewage 500,000 9 (Base Project Allocation - $500,000) 10 (ix) Cook Forest State Park 11 (A) Rehabilitation of trail, Phase II 250,000 12 (Base Project Allocation - $250,000) 13 (B) Rehabilitate five campground 14 washhouses 600,000 15 (Base Project Allocation - $600,000) 16 (C) Replace park office and visitors' 17 center 2,500,000 18 (Base Project Allocation - $2,500,000) 19 (D) Replace six river cabins 2,200,000 20 (Base Project Allocation - $2,200,000) 21 (E) Rehabilitate sewage system and 22 repairs 750,000 23 (Base Project Allocation - $750,000) 24 (F) Provide repairs to the water system 750,000 25 (Base Project Allocation - $750,000) 26 (G) Rehabilitate road and parking lot 1,100,000 27 (Base Project Allocation - $1,100,000) 28 (H) REPAIR WATER SYSTEM AND REHABILITATE <-- 29 BOOSTER STATION AND WATER STORAGE 30 TANKS 600,000 20070H1589B4129 - 298 -
1 (x) Colton Point State Park 2 (A) Replace two pit latrines with 3 composting restroom, playground, picnic 4 area and campground shower house 1,500,000 5 (Base Project Allocation - $1,500,000) 6 (X.1) DELAWARE CANAL STATE PARK <-- 7 (A) REPLACE FERRY STREET BRIDGE 500,000 8 (xi) Elk State Park 9 (A) Replace comfort station 150,000 10 (Base Project Allocation - $150,000) 11 (xii) Erie Bluffs State Park 12 (A) Construct entrance to the park 300,000 13 (Base Project Allocation - $300,000) 14 (xiii) Evansburg State Park 15 (A) Provide road paving for the park 335,000 16 (Base Project Allocation - $335,000) 17 (B) Replace sewer lines 250,000 18 (Base Project Allocation - $250,000) 19 (C) Replace temporary restrooms, Phase II 250,000 20 (Base Project Allocation - $250,000) 21 (D) CONSTRUCT SEWAGE COLLECTION SYSTEM TO <-- 22 CONNECT RESIDENCES TO MUNICIPAL SYSTEM 250,000 23 (xiv) Forest District 2 24 (A) Construct new resource management 25 center 3,500,000 26 (Base Project Allocation - $3,500,000) 27 (xv) Forest District 3 28 (A) Establish new maintenance headquarter 29 buildings in Juniata, Mifflin and Perry 30 Counties 800,000 20070H1589B4129 - 299 -
1 (Base Project Allocation - $800,000) 2 (B) Rehabilitate Gunter Valley Dam in 3 Perry County 5,000,000 4 (Base Project Allocation - $5,000,000) 5 (xvi) Forest District 4 6 (A) Rehabilitate Linn Run Road 2,500,000 7 (Base Project Allocation - $2,500,000) 8 (xvii) Forest District 5 9 (A) Rehabilitate resource management 10 center 1,500,000 11 (Base Project Allocation - $1,500,000) 12 (xviii) Forest District 8 13 (A) Rehabilitate Kittanning Resource 14 Management Center 1,500,000 15 (Base Project Allocation - $1,500,000) 16 (xix) Forest District 14 17 (A) Rehabilitate historic stone house 250,000 18 (Base Project Allocation - $250,000) 19 (xx) Forest District 18 20 (A) SR 54 comfort station and parking 500,000 21 (Base Project Allocation - $500,000) 22 (B) New resource management center 3,500,000 23 (Base Project Allocation - $3,500,000) 24 (C) Rehabilitate Roaring Creek tract 25 facilities 600,000 26 (Base Project Allocation - $600,000) 27 (D) Rehabilitate Roaring Creek tract 28 trails and bridges 1,155,000 29 (Base Project Allocation - $1,155,000) 30 (E) Maintenance to Haldeman complex 300,000 20070H1589B4129 - 300 -
1 (Base Project Allocation - $300,000) 2 (xxi) Forest District 19 3 (A) New resource management center 3,500,000 4 (Base Project Allocation - $3,500,000) 5 (B) Rehabilitate Little Summit Fire 6 Station maintenance complex 300,000 7 (Base Project Allocation - $300,000) 8 (C) Project for Pine Flats Road 200,000 9 (Base Project Allocation - $200,000) 10 (D) Project for Flat Ridge Road 200,000 11 (Base Project Allocation - $200,000) 12 (xxii) Forest District 20 13 (A) Pave Dry Run Road 300,000 14 (Base Project Allocation - $300,000) 15 (B) Provide for Hillsgrove storage 16 building 300,000 17 (Base Project Allocation - $300,000) 18 (C) Pave High Knob Road 500,000 19 (Base Project Allocation - $500,000) 20 (xxiii) Frances Slocum State Park 21 (A) Rehabilitate sewage treatment plant 22 and lines 1,500,000 23 (Base Project Allocation - $1,500,000) 24 (xxiv) French Creek State Park 25 (A) Rehabilitate Scotts Run area 1,500,000 26 (Base Project Allocation - $1,500,000) 27 (xxv) Gifford Pinchot State Park 28 (A) Phase II rehabilitation of camp area 29 washhouse 400,000 30 (Base Project Allocation - $400,000) 20070H1589B4129 - 301 -
1 (xxvi) Gouldsboro State Park 2 (A) Repair dam at the park 750,000 3 (Base Project Allocation - $750,000) 4 (B) Replace pit bathhouse, comfort station 5 and boat rental 600,000 6 (Base Project Allocation - $600,000) 7 (xxvii) Greenwood Furnace State Park 8 (A) Make repairs to sewage treatment 9 plant 900,000 10 (Base Project Allocation - $900,000) 11 (xxviii) Hickory Run State Park 12 (A) Replace pit latrines and water tank 1,800,000 13 (Base Project Allocation - $1,800,000) 14 (B) Phase II of group camp roof 15 replacement 200,000 16 (Base Project Allocation - $200,000) 17 (C) Replace office and visitors' center 2,000,000 18 (Base Project Allocation - $2,000,000) 19 (D) Replace pit toilets and four 20 buildings 1,250,000 21 (Base Project Allocation - $1,250,000) 22 (E) REPLACE FOUR PIT LATRINES AT THE <-- 23 CAMPGROUND AND ORGANIZED GROUP CAMP 24 WITH FLUSH COMFORT STATIONS 2,000,000 25 (xxix) Hills Creek State Park 26 (A) Rehabilitate spillway 600,000 27 (Base Project Allocation - $600,000) 28 (B) Provide office renovation addition and 29 visitors' center 2,100,000 30 (Base Project Allocation - $2,100,000) 20070H1589B4129 - 302 -
1 (xxx) Hyner Run State Park 2 (A) Rehabilitate two park bridges and pave 3 roadway 600,000 4 (Base Project Allocation - $600,000) 5 (B) Replace two day use restrooms 300,000 6 (Base Project Allocation - $300,000) 7 (xxxi) Kettle Creek State Park 8 (A) Provide bathhouse, shower house and 9 sewage 1,800,000 10 (Base Project Allocation - $1,800,000) 11 (xxxii) Kooser State Park 12 (A) Rehabilitate main park road and 13 replace two bridges 1,300,000 14 (Base Project Allocation - $1,300,000) 15 (xxxiii) Lackawanna State Park 16 (A) Replace park office 1,500,000 17 (Base Project Allocation - $1,500,000) 18 (B) Rehabilitate pool complex and day use 19 area 3,000,000 20 (Base Project Allocation - $3,000,000) 21 (xxxiv) Laurel Hill State Park 22 (A) Breach Spruce Run Dam 250,000 23 (Base Project Allocation - $250,000) 24 (B) Provide Jones Mill Run Dam dredging 250,000 25 (Base Project Allocation - $250,000) 26 (C) Rehabilitate group camp three sewage 27 lines 250,000 28 (Base Project Allocation - $250,000) 29 (D) Provide camping cottage shower house 30 at the park 650,000 20070H1589B4129 - 303 -
1 (Base Project Allocation - $650,000) 2 (E) Rehabilitate contact station and 3 parking 500,000 4 (Base Project Allocation - $500,000) 5 (xxxv) Laurel Ridge State Park 6 (A) Replace turnpike trail bridge 7 superstructure 1,200,000 8 (Base Project Allocation - $1,200,000) 9 (xxxvi) Little Pine State Park 10 (A) Rehabilitate dam 500,000 11 (Base Project Allocation - $500,000) 12 (xxxvii) Lyman Run State Park 13 (A) Provide construction to the spillway 14 bridge 500,000 15 (Base Project Allocation - $500,000) 16 (xxxviii) Marsh Creek State Park 17 (A) Pave all parking lots in the park 325,000 18 (Base Project Allocation - $325,000) 19 (B) Provide ADA office expansion 150,000 20 (Base Project Allocation - $150,000) 21 (xxxix) McConnells Mill State Park 22 (A) Rehabilitate the park road 275,000 23 (Base Project Allocation - $275,000) 24 (xl) Moraine State Park 25 (A) Resurface bike trail in park 1,200,000 26 (Base Project Allocation - $1,200,000) 27 (B) Rehabilitate Old 422 launch and road 1,000,000 28 (Base Project Allocation - $1,000,000) 29 (xli) Neshaminy State Park 30 (A) Rehabilitate jetty 350,000 20070H1589B4129 - 304 -
1 (Base Project Allocation - $350,000) 2 (B) REHABILITATE POOL CONCESSION BUILDING 350,000 <-- 3 (xlii) Nockamixon State Park 4 (A) Provide paving in the park 500,000 5 (Base Project Allocation - $500,000) 6 (B) Replace three pit toilets 1,000,000 7 (Base Project Allocation - $1,000,000) 8 (xliii) Ohiopyle State Park 9 (A) Rehabilitate residence 250,000 10 (Base Project Allocation - $250,000) 11 (B) Replace bridge 0902-CSX 2288 300,000 12 (Base Project Allocation - $300,000) 13 (C) Construct parking above new office 900,000 14 (Base Project Allocation - $900,000) 15 (D) Provide park office accessibility 2,000,000 16 (Base Project Allocation - $2,000,000) 17 (E) Provide bathhouse, shower house and 18 sewage 275,000 19 (Base Project Allocation - $275,000) 20 (xliv) Oil Creek State Park 21 (A) Rehabilitate Boughton Bridge 400,000 22 (Base Project Allocation - $400,000) 23 (B) Phase I to repair trail slips 300,000 24 (Base Project Allocation - $300,000) 25 (xlv) Parker Dam State Park 26 (A) Rehabilitate dam spillway 350,000 27 (Base Project Allocation - $350,000) 28 (xlvi) Park Region 1 29 (A) Rehabilitate surface water 30 systems/filter 300,000 20070H1589B4129 - 305 -
1 (Base Project Allocation - $300,000) 2 (B) Rehabilitate surface and well water 3 supplies in Region 1 State parks 1,500,000 4 (Base Project Allocation - $1,500,000) 5 (xlvii) Park Region 2 6 (A) Rehabilitate the residence 250,000 7 (Base Project Allocation - $250,000) 8 (xlviii) Pine Grove Furnace State Park 9 (A) Rehabilitate water treatment plant 2,000,000 10 (Base Project Allocation - $2,000,000) 11 (B) Rehabilitate various buildings 3,400,000 12 (Base Project Allocation - $3,400,000) 13 (xlix) Presque Isle State Park 14 (A) Provide bike trail extension to the 15 Tom Ridge Environmental Center 1,800,000 16 (Base Project Allocation - $1,800,000) 17 (l) Prince Gallitzin State Park 18 (A) Rehabilitate sewage treatment plant 800,000 19 (Base Project Allocation - $800,000) 20 (B) Rehabilitate Beaver Valley Marina 2,900,000 21 (Base Project Allocation - $2,900,000) 22 (li) Promised Land State Park 23 (A) Rehabilitate sewer line 750,000 24 (Base Project Allocation - $750,000) 25 (B) Replace bridge and spillway 3,100,000 26 (Base Project Allocation - $3,100,000) 27 (C) Rehabilitate Pickerel Point and 28 Deerfield campgrounds 3,000,000 29 (Base Project Allocation - $3,000,000) 30 (D) Rehabilitate boat rental area 500,000 20070H1589B4129 - 306 -
1 (Base Project Allocation - $500,000) 2 (E) Rehabilitate dump station 300,000 3 (Base Project Allocation - $300,000) 4 (F) Rehabilitate bridges 120,000 5 (Base Project Allocation - $120,000) 6 (lii) Pymatuning State Park 7 (A) Rehabilitate Espyville south launch 8 and environs 1,500,000 9 (Base Project Allocation - $1,500,000) 10 (B) Rehabilitate Jamestown beach house 650,000 11 (Base Project Allocation - $650,000) 12 (C) Rehabilitate sanitary facilities on 13 the west side 2,200,000 14 (Base Project Allocation - $2,200,000) 15 (liii) Raccoon Creek State Park 16 (A) Provide roadway slip repairs 800,000 17 (Base Project Allocation - $800,000) 18 (B) Phase II rehabilitation of roads 300,000 19 (Base Project Allocation - $300,000) 20 (liv) Ralph Stover State Park 21 (A) Replace pit latrines and sewer 500,000 22 (Base Project Allocation - $500,000) 23 (lv) Ricketts Glen State Park 24 (A) Rehabilitate bathhouse and comfort 25 stations 2,800,000 26 (Base Project Allocation - $2,800,000) 27 (B) Rehabilitate roads and provide paving 28 for parking lots 650,000 29 (Base Project Allocation - $650,000) 30 (C) Replace pit latrine Route 118 picnic 20070H1589B4129 - 307 -
1 area 400,000 2 (Base Project Allocation - $400,000) 3 (D) Repair infiltration, sewage treatment 4 plant and water system 550,000 5 (Base Project Allocation - $550,000) 6 (lvi) Ridley Creek State Park 7 (A) Reroof maintenance building 400,000 8 (Base Project Allocation - $400,000) 9 (B) Pave parking lot 300,000 10 (Base Project Allocation - $300,000) 11 (lvii) Salt Springs State Park 12 (A) Replace vault latrine 300,000 13 (Base Project Allocation - $300,000) 14 (lviii) Samuel S. Lewis State Park 15 (A) Provide two new comfort stations with 16 on-lot sewage 750,000 17 (Base Project Allocation - $750,000) 18 (lix) Shawnee State Park 19 (A) Rehabilitate water treatment plant 1,200,000 20 (Base Project Allocation - $1,200,000) 21 (lx) Sinnemahoning State Park 22 (A) Rehabilitate main park road and 23 replace bridges 1,000,000 24 (Base Project Allocation - $1,000,000) 25 (B) REPLACE TWO BRIDGES ON MAIN PARK ROAD 500,000 <-- 26 (lxi) Sizerville State Park 27 (A) Modernize pit latrines and bathhouse 2,000,000 28 (Base Project Allocation - $2,000,000) 29 (B) Provide new park office and visitors' 30 center 1,800,000 20070H1589B4129 - 308 -
1 (Base Project Allocation - $1,800,000) 2 (lxii) Tiadaghton State Forest 3 (A) Construct Tiadaghton Management 4 Center 4,500,000 5 (Base Project Allocation - $4,500,000) 6 (lxiii) Tobyhanna State Park 7 (A) Rehabilitate day use area and 8 campground 2,500,000 9 (Base Project Allocation - $2,500,000) 10 (lxiv) Whipple Dam State Park 11 (A) Provide new multifunction beach 12 building 1,200,000 13 (Base Project Allocation - $1,200,000) 14 (lxv) Yellow Creek State Park 15 (A) Provide camping cottage shower house 650,000 16 (Base Project Allocation - $650,000) 17 (LXV.1) WEISER STATE FOREST <-- 18 (A) CONSTRUCT WEISER RESOURCE MANAGEMENT 19 CENTER 3,500,000 20 (lxvi) White Clay Creek Preserve 21 (A) Rebuild London Tract wall 150,000 22 (Base Project Allocation - $150,000) 23 (B) RECONSTRUCT CEMETERY WALL AT LONDON <-- 24 TRACT MEETING HOUSE 150,000 25 (lxvii) Worlds End State Park 26 (A) Rehabilitate campground and day use 27 area roads 350,000 28 (Base Project Allocation - $350,000) 29 (lxviii) Various parks, Statewide 30 (A) Acquire land to be incorporated within 20070H1589B4129 - 309 -
1 the park system according to the
2 Commonwealth's master plan 10,000,000
3 (Land Allocation - $10,000,000)
4 Section 10. Itemization of State forestry bridge projects.
5 Projects in the category of State forestry bridge projects to
6 be constructed by the Department of Conservation and Natural
7 Resources, its successors or assigns, and to be financed by oil
8 company franchise tax revenues pursuant to 75 Pa.C.S. §
9 9502(a)(2)(iv) (relating to imposition of tax) are hereby
10 itemized, together with their respective estimated costs, as
11 follows:
12 Total
13 Project
14 Project Allocation
15 (1) CAMERON COUNTY <--
16 (I) ELK STATE FOREST
17 (A) REPLACE DENTS RUN BRIDGE OVER LITTLE
18 DENTS RUN 200,000
19 (1) (1.1) Centre County <--
20 (i) Forest District 9
21 (A) Project for Meyers Run Road and Black
22 Moshannon Creek 400,000
23 (B) Project for North Run Road over Smays
24 Run 300,000
25 (II) MOSHANNON STATE FOREST <--
26 (A) REPLACE GORDON ROAD BRIDGE OVER
27 ANDERSON CREEK 185,000
28 (2) Clearfield County
29 (i) Forest District 9
30 (A) Project for Shirks Road over Black
20070H1589B4129 - 310 -
1 Moshannon Creek bridge No. 9-0028 300,000 2 (B) Project for Reservoir Road over Upper 3 Three Run 300,000 4 (C) Project for Little Medix Road over 5 Little Medix Run, bridge No. 9-0012 300,000 6 (3) Clinton County 7 (i) Forest District 10 8 (A) Project for Beaver Dam Road over 9 Beaver Dam Run 300,000 10 (B) Project for Birch Island Road over 11 Amos Branch, bridge No. 10-0040 300,000 12 (II) SPROUL STATE FOREST <-- 13 (A) REPLACE BEAVER DAM RUN ROAD OVER 14 BEAVER DAM RUN (BRIDGE NOS. 10-9002, 15 10-9003 AND 10-9004) 500,000 16 (4) Elk County 17 (i) Forest District 13 18 (A) Project for East Hicks Road over Barr 19 Hollow 300,000 20 (B) Project for Little Dents Road over 21 Dents Run Bridge No. 13-0032 300,000 22 (C) Project for Dents Run Road over Little 23 Bear Run 300,000 24 (D) Project for Dents Run Road over 25 Weatherboard Run 300,000 26 (E) Project for bridge over North Fork 300,000 27 (4.1) FRANKLIN COUNTY <-- 28 (I) MICHAUX STATE FOREST 29 (A) REPLACE BIESECKER GAP ROAD BRIDGE OVER 30 BIESECKER RUN 300,000 20070H1589B4129 - 311 -
1 (5) Huntingdon County 2 (i) Forest District 5 3 (A) Project for Krise Valley Road bridge 300,000 4 (II) ROTHROCK STATE FOREST <-- 5 (A) REPLACE LINGLE VALLEY ROAD BRIDGE OVER 6 LAUREL CREEK 300,000 7 (B) REPLACE PENNSYLVANIA FURNACE ROAD 8 BRIDGE OVER GLOBE RUN 300,000 9 (6) Lycoming County 10 (i) Forest District 12 11 (A) Project for Trout Run Road and 12 bridges 600,000 13 (B) Project for Frances Road over unnamed 14 tributary near Black Forest Trail 300,000 15 (II) TIADAGHTON STATE FOREST <-- 16 (A) REPLACE FRANCIS ROAD BRIDGE OVER 17 RANDALL HOLLOW, PIPELINE ROAD BRIDGE 18 OVER UNNAMED TRIBUTARY, AND BRIDGES 19 9027, 9016, 9003 AND 9004 830,000 20 (7) Perry County 21 (i) Forest District 3 22 (A) Project for the Second Narrows Road 23 bridge 300,000 24 (8) Tioga County 25 (i) Forest District 12 26 (A) Project for Francis Road over unnamed 27 tributary at Pipeline Road 300,000 28 (B) Project for Francis Road over Woodward 29 Hollow 300,000 30 (C) Project for Francis Road over Randall 20070H1589B4129 - 312 -
1 Hollow bridge No. 12-9003 300,000 2 (D) Project for Francis Road over Kramer 3 Hollow bridge No. 12-9016 300,000 4 (E) Project for Francis Road over Francis 5 Branch bridge No. 12-0048 300,000 6 (ii) Forest District 16 7 (A) Project for Spoor Hollow Road over 8 Norris Brook bridge No. 16-0001 300,000 9 (B) Project for Cedar Mountain Road over 10 Cedar Run bridge No. 16-0014 300,000 11 (9) Union County 12 (i) Forest District 7 13 (A) Replace Brandon Road bridge 300,000 14 (B) Project for Cooper Mill Road bridge 300,000 15 (II) BALD EAGLE STATE FOREST <-- 16 (A) REPLACE BRANDON ROAD BRIDGE OVER NORTH 17 BUFFALO CREEK 300,000 18 (10) Clearfield and Elk Counties 19 (i) Forest District 9 20 (A) Project for three culverts on Little 21 Medix Road over Little Medix Run 400,000 22 Section 11. Itemization of General Fund current revenue 23 projects. 24 The individual capital projects in the category of public 25 improvement projects to be constructed or acquired by the 26 Department of General Services, its successors or assigns, and 27 to be financed from General Fund current revenues, are hereby 28 itemized, together with their respective estimated financial 29 costs, as follows: 30 Total 20070H1589B4129 - 313 -
1 Project 2 Project Allocation 3 (1) Department of Corrections 4 (i) State Correctional Institution at Albion 5 (A) Lease and/or purchase an emergency 6 housing facility along with related 7 infrastructure improvements 2,500,000 8 (Base Project Allocation - $2,500,000) 9 (ii) State Correctional Institution at 10 Cambridge Springs 11 (A) Lease and/or purchase an emergency 12 housing facility along with related 13 infrastructure improvements 2,500,000 14 (Base Project Allocation - $2,500,000) 15 (iii) State Correctional Institution at 16 Greensburg 17 (A) Lease and/or purchase an emergency 18 housing facility along with related 19 infrastructure improvements 2,500,000 20 (Base Project Allocation - $2,500,000) 21 (iv) State Correctional Institution at 22 Houtzdale 23 (A) Lease and/or purchase an emergency 24 housing facility along with related 25 infrastructure improvements 2,500,000 26 (Base Project Allocation - $2,500,000) 27 (v) State Correctional Institution at Laurel 28 Highlands 29 (A) Lease and/or purchase two separate 30 emergency housing facilities along with 20070H1589B4129 - 314 -
1 related infrastructure improvements 4,000,000 2 (Base Project Allocation - $4,000,000) 3 (vi) State Correctional Institution at Mahanoy 4 (A) Lease and/or purchase an emergency 5 housing facility along with related 6 infrastructure improvements 2,500,000 7 (Base Project Allocation - $2,500,000) 8 (vii) State Correctional Institution at Muncy 9 (A) Lease and/or purchase two separate 10 emergency housing facilities along with 11 related infrastructure improvements 4,000,000 12 (Base Project Allocation - $4,000,000) 13 (viii) State Correctional Institution at Pine 14 Grove 15 (A) Lease and/or purchase an emergency 16 housing facility along with related 17 infrastructure improvements 2,500,000 18 (Base Project Allocation - $2,500,000) 19 (ix) State Correctional Institution at Retreat 20 (A) Lease and/or purchase an emergency 21 housing facility along with related 22 infrastructure improvements 3,500,000 23 (Base Project Allocation - $3,500,000) 24 (x) State Correctional Institution at Rockview 25 (A) Lease and/or purchase an emergency 26 housing facility along with related 27 infrastructure improvements 2,500,000 28 (Base Project Allocation - $2,500,000) 29 (2) Pennsylvania Historical and Museum Commission 30 (i) Pennsylvania Military Museum 20070H1589B4129 - 315 -
1 (A) Design and construct a 2,500-square- 2 foot storage building for historical 3 military vehicles 600,000 4 (Base Project Allocation - $500,000) 5 (Design and Contingencies - $100,000) 6 Section 11.1. Itemization of Manufacturing Fund current revenue 7 projects. 8 (a) Public improvement projects.--The individual capital 9 projects in the category of public improvement projects to be 10 developed by the Department of General Services, its successors 11 or assigns, for the Department of Corrections and to be financed 12 from current revenues of the Manufacturing Fund are hereby 13 itemized together with their respective itemized costs as 14 follows: 15 Total 16 Project 17 Project Allocation 18 (1) Department of Corrections 19 (i) State Correctional Institution at 20 Frackville 21 (A) Modify an existing building into a 22 regional laundry facility for 23 correctional industries including 24 laundry equipment 3,000,000 25 (Base Project Allocation - $3,000,000) 26 Section 11.2. Itemization of Pennsylvania Fish and Boat 27 Commission capital projects. 28 The individual capital projects in the category of public 29 improvements projects to be acquired or developed by the 30 Pennsylvania Fish and Boat Commission and to be financed by the 20070H1589B4129 - 316 -
1 incurring of debt or by the current revenues of the Fish Fund 2 and the Boat Fund pursuant to executive authorizations are 3 hereby itemized together with their respective estimated costs, 4 as follows: Total 5 Project 6 Project Allocation 7 (1) Pennsylvania Fish and Boat Commission 8 (i) Bedford County 9 (A) Design, rehabilitate and construct 10 fish rearing facilities and related 11 infrastructure, Reynoldsdale State Fish 12 Hatchery 9,300,000 13 (i.1) Butler County 14 (A) Design and construct a new dam 15 according to current standards or 16 renovate, reconstruct or demolish 17 existing dam, Glade Run 4,500,000 18 (ii) Centre County 19 (A) Design, replace or remodel Pleasant 20 Gap Headquarters 6,500,000 21 (iii) Cumberland County 22 (A) Design and construct a new dam 23 according to current standards, Opossum 24 Lake 4,600,000 25 (B) Design and construct a new dam 26 according to current standards or 27 renovate, reconstruct or demolish 28 existing dam, Opossum Lake 4,000,000 29 (iv) Dauphin County 30 (A) Provide additional office space and 20070H1589B4129 - 317 -
1 work areas for administrative and 2 technical needs and also for partners 3 related to the commission's mission, 4 Harrisburg Headquarters 1,200,000 5 (v) Fayette County 6 (A) Design and construct a new dam 7 according to current standards or 8 renovate, reconstruct or demolish 9 existing dam, Virgin Run Lake 5,000,000 10 (vi) Jefferson County 11 (A) Design and construct a new dam 12 according to current standards or 13 renovate, reconstruct or demolish 14 existing dam, Kyle Lake 5,000,000 15 (vii) Lancaster County 16 (A) Design and construct a new dam 17 according to current standards or 18 renovate, reconstruct or demolish 19 existing dam, Speedwell Forge Lake 5,500,000 20 (viii) Northampton County 21 (A) Design and construct a new dam 22 according to current standards or 23 renovate, reconstruct or demolish 24 existing dam, Minsi Lake 3,500,000 25 (ix) Somerset County 26 (A) Design and construct a new dam 27 according to current standards or 28 renovate, reconstruct or demolish 29 existing dam, Lake Somerset 3,500,000 30 (x) Tioga County 20070H1589B4129 - 318 -
1 (A) Design and construct a new dam 2 according to current standards or 3 renovate, reconstruct or demolish 4 existing dam, Lake Nessmuk 1,500,000 5 (xi) Washington County 6 (A) Rehabilitation and repairs, including 7 infrastructure improvements, Dutch Fork 8 Lake Dam 9,000,000 9 (B) Design and construct a new dam 10 according to current standards or 11 renovate, reconstruct or demolish 12 existing dam, Canonsburg Lake 6,500,000 13 (xii) Wayne County 14 (A) Design and construct a new dam 15 according to current standards or 16 renovate, reconstruct or demolish 17 existing dam, Lower Woods Pond Lake 1,500,000 18 (B) Design and construct a new dam 19 according to current standards or 20 renovate, reconstruct or demolish 21 existing dam, Belmont Lake 1,500,000 22 (xiii) Westmoreland County 23 (A) Design and construct a new dam 24 according to current standards or 25 renovate, reconstruct or demolish 26 existing dam, Donegal Lake 4,500,000 27 (xiv) Wyoming County 28 (A) Design and construct a new dam 29 according to current standards or 30 renovate, reconstruct or demolish 20070H1589B4129 - 319 -
1 existing dam, Stevens Lake 2,000,000 2 SECTION 11.3. ITEMIZATION OF STATE ATV/SNOWMOBILE FUND CURRENT <-- 3 REVENUE PROJECTS. 4 PROJECTS IN THE CATEGORY OF STATE ATV/SNOWMOBILE FUND 5 PROJECTS TO BE CONSTRUCTED BY THE DEPARTMENT OF CONSERVATION AND 6 NATURAL RESOURCES, ITS SUCCESSORS OR ASSIGNS, AND TO BE FINANCED 7 FROM STATE ATV/SNOWMOBILE FUND CURRENT REVENUE, ARE HEREBY 8 ITEMIZED, TOGETHER WITH THEIR RESPECTIVE ESTIMATED COSTS, AS 9 FOLLOWS: TOTAL 10 PROJECT 11 PROJECT ALLOCATION 12 (1) MONROE COUNTY 13 (I) DELAWARE STATE FOREST 14 (A) CONSTRUCT DIXON MILLER ATV TRAIL 500,000 15 (II) SPROUL STATE FOREST 16 (A) CONSTRUCT AN ATV TRAIL OVER BEECH 17 CREEK AND TWO ROCK RUN 500,000 18 SECTION 11.4. ITEMIZATION OF STATE TRANSPORTATION ENHANCEMENT 19 FUNDS CURRENT REVENUE PROJECTS. 20 PROJECTS IN THE CATEGORY OF STATE TRANSPORTATION ENHANCEMENT 21 FUNDS PROJECTS TO BE CONSTRUCTED BY THE DEPARTMENT OF 22 CONSERVATION AND NATURAL RESOURCES, ITS SUCCESSORS OR ASSIGNS, 23 AND TO BE FINANCED FROM STATE TRANSPORTATION ENHANCEMENT FUNDS 24 CURRENT REVENUE, ARE HEREBY ITEMIZED, TOGETHER WITH THEIR 25 RESPECTIVE ESTIMATED COSTS, AS FOLLOWS: TOTAL 26 PROJECT 27 PROJECT ALLOCATION 28 (1) BUCKS COUNTY 29 (I) DELAWARE CANAL STATE PARK 30 (A) CONSTRUCT PEDESTRIAN TOW PATH ACCESS 20070H1589B4129 - 320 -
1 THROUGH RAILROAD AT CONRAIL SIDING AT
2 FAIRLESS STEEL 1,000,000
3 Section 11.3 11.5. Itemization of Motor License Fund projects. <--
4 The individual capital projects in the category of public
5 improvement projects to be developed by the Department of
6 General Services, its successors or assigns, for the Department
7 of Transportation, and to be financed by the incurring of debt
8 or from current revenues in the Motor License Fund are hereby
9 itemized together with their respective itemized costs as
10 follows: Total
11 Project
12 Project Allocation
13 (1) Department of Transportation
14 (i) Armstrong County
15 (A) Renovate the maintenance garage,
16 District 10-1 440,000
17 (B) Construct weld shop addition, District
18 10-1 385,000
19 (ii) Bedford County
20 (A) Install new Bedford County garage HVAC
21 system 850,000
22 (iii) Butler County
23 (A) Replace boilers and install infrared
24 heat, District 10-2 600,000
25 (B) Install new HVAC system, District 102 715,000
26 (C) Replace roof, District 10-2 385,000
27 (D) Repair structural damage, District 10-
28 2 495,000
29 (iv) Carbon County
30 (A) Construct new vehicle wash bay 550,000
20070H1589B4129 - 321 -
1 (B) Renovate metal building 360,000 2 (v) Centre County 3 (A) Construct new vehicle wash bay 550,000 4 (vi) Clarion County 5 (A) Construct and repair new weigh 6 station, District 10-3 375,000 7 (vii) Columbia County 8 (A) Construct weld shop addition, District 9 3-1 412,000 10 (viii) Crawford County 11 (A) Construct new vehicle wash bay 550,000 12 (ix) Cumberland County 13 (A) Construct new vehicle wash bay 550,000 14 (x) Delaware County 15 (A) Construct new vehicle wash bay 550,000 16 (xi) Erie County 17 (A) Construct new vehicle wash bay 550,000 18 (xii) Indiana County 19 (A) Construct new vehicle wash bay 550,000 20 (B) Construct training and emergency 21 operation center, District 10-0 850,000 22 (C) Install new HVAC system, District 10- 23 0 440,000 24 (D) Install new HVAC system, District 10- 25 4 577,000 26 (xiii) Jefferson County 27 (A) Construct new vehicle wash bay 550,000 28 (xiv) Juniata County 29 (A) Renovate front office, restroom and 30 HVAC system and upgrade weld shop, 20070H1589B4129 - 322 -
1 District 2-9 450,000 2 (xv) Lackawanna County 3 (A) Construct new vehicle wash bay 550,000 4 (B) Renovate office, District 4-0 715,000 5 (C) Replace roof, Lackawanna County 6 garage 633,000 7 (D) Renovate and expand parking lot and 8 ramps, RSR Site 55 660,000 9 (xvi) Lancaster County 10 (A) Construct new vehicle wash bay 550,000 11 (xvii) McKean County 12 (A) Renovate front office and restroom and 13 upgrade HVAC, District 2-5 300,000 14 (xviii) Monroe County 15 (A) Construct new vehicle wash bay 550,000 16 (B) Replace roof on Monroe County garage 550,000 17 (xix) Montgomery County 18 (A) Repair garage parking deck, District 19 6-0 engineering office 500,000 20 (B) Replace HVAC piping, District 6-0 21 engineering office 300,000 22 (C) Construct new vehicle wash bay 550,000 23 (D) Install new generator, District 6-0 24 office 412,000 25 (xx) Northumberland County 26 (A) Construct preventative maintenance 27 bay, District 3-4 500,000 28 (B) Construct new preventative maintenance 29 bay, District 3-4 660,000 30 (xxi) Perry County 20070H1589B4129 - 323 -
1 (A) Construct new vehicle wash bay 550,000
2 (xxii) Philadelphia County
3 (A) Construct new vehicle wash bay 550,000
4 (xxiii) Snyder County
5 (A) Demolish portion of old garage and
6 construct bridge beam shop, District 3-
7 5 400,000
8 (xxiv) Susquehanna County
9 (A) Construct new vehicle wash bay 550,000
10 (xxv) Venango County
11 (A) Install new HVAC system, District 1-0 770,000
12 (xxvi) Wyoming County
13 (A) Make renovations and install new HVAC
14 system, District 4-7 660,000
15 (xxvii) York County
16 (A) Construct new hi-arch salt storage and
17 additional buildings 550,000
18 (B) Repair floor and repair or replace
19 HVAC system, York County garage 950,000
20 SECTION 11.6. WAIVER PROVISION. <--
21 NOTWITHSTANDING ANY PROVISION TO THE CONTRARY, THERE SHALL BE
22 NO LOCAL OR PRIVATE MATCH-FUNDING REQUIREMENTS FOR THE PROJECT
23 UNDER SECTION 5(B)(1)(II).
24 Section 12. Debt authorization.
25 (a) Public improvements.--The Governor, Auditor General and
26 State Treasurer are hereby authorized and directed to borrow
27 from time to time in addition to any authorization heretofore or
28 hereafter enacted, on the credit of the Commonwealth, subject to
29 the limitations provided in the current capital budget, money
30 not exceeding in the aggregate the sum of $5,120,432,000 <--
20070H1589B4129 - 324 -
1 $5,972,762,000 as may be found necessary to carry out the <-- 2 acquisition and construction of the public improvement projects 3 specifically itemized in a capital budget. 4 (b) Furniture and equipment.--The Governor, Auditor General 5 and State Treasurer are hereby authorized and directed to borrow 6 from time to time in addition to any authorization heretofore or 7 hereafter enacted, on the credit of the Commonwealth, subject to 8 the limitations provided in the current capital budget, money 9 not exceeding in the aggregate the sum of $166,346,000 <-- 10 $173,481,000 as may be found necessary to carry out the <-- 11 acquisition and construction of the public improvement projects 12 consisting of the acquisition of original movable furniture and 13 equipment specifically itemized in a capital budget. 14 (c) Transportation assistance.--The Governor, Auditor 15 General and State Treasurer are hereby authorized and directed 16 to borrow from time to time in addition to any authorization 17 heretofore or hereafter enacted, on the credit of the 18 Commonwealth, subject to the limitations provided in the current 19 capital budget, money not exceeding in the aggregate the sum of 20 $750,939,000 $954,737,000 as may be found necessary to carry out <-- 21 the acquisition and construction of the transportation 22 assistance projects specifically itemized in a capital budget. 23 (d) Redevelopment assistance.--Subject to the limitation in 24 section 317(b) of the act of February 9, 1999 (P.L.1, No.1), 25 known as the Capital Facilities Debt Enabling Act, the Governor, 26 Auditor General and State Treasurer are hereby authorized and 27 directed to borrow from time to time in addition to any 28 authorization heretofore or hereafter enacted, on the credit of 29 the Commonwealth, subject to the limitations provided in the 30 current capital budget, money not exceeding in the aggregate the 20070H1589B4129 - 325 -
1 sum of $6,482,798,000 $7,533,808,000 as may be found necessary <-- 2 to carry out the redevelopment assistance capital projects 3 specifically itemized in a capital budget. 4 (e) Flood control.--The Governor, Auditor General and State 5 Treasurer are hereby authorized and directed to borrow from time 6 to time in addition to any authorization heretofore or hereafter 7 enacted, on the credit of the Commonwealth, subject to the 8 limitations provided in the current capital budget, money not 9 exceeding in the aggregate the sum of $74,526,000 $96,199,000 as <-- 10 may be found necessary to carry out the acquisition and 11 construction of the flood control projects specifically itemized 12 in a capital budget. 13 (f) Pennsylvania Fish and Boat Commission projects.--The 14 Governor, Auditor General and State Treasurer are hereby 15 authorized and directed to borrow from time to time in addition 16 to any authorization heretofore or hereafter enacted, on the 17 credit of the Commonwealth, subject to the limitations provided 18 in the current capital budget, money not exceeding in the 19 aggregate sum of $79,100,000 as may be found necessary to carry 20 out the acquisition and construction of the Pennsylvania Fish 21 and Boat Commission projects specifically itemized in this 22 capital budget. 23 (g) Motor License Fund projects.--The Governor, Auditor 24 General and State Treasurer are hereby authorized and directed 25 to borrow from time to time in addition to any authorization 26 heretofore or hereafter enacted, on the credit of the 27 Commonwealth, subject to the limitations provided in the current 28 capital budget, money not exceeding in the aggregate the sum of 29 $24,144,000 as may be found necessary to carry out the 30 acquisition and construction of the Motor License Fund projects 20070H1589B4129 - 326 -
1 specifically itemized in a capital budget.
2 Section 13. Issue of bonds.
3 The indebtedness authorized in this act shall be incurred
4 from time to time and shall be evidenced by one or more series
5 of general obligation bonds of the Commonwealth in such
6 aggregate principal amount for each series as the Governor, the
7 Auditor General and the State Treasurer shall determine, but the
8 latest stated maturity date shall not exceed the estimated
9 useful life of the projects being financed as stated in section
10 14.
11 Section 14. Estimated useful life and term of debt.
12 (a) Estimated useful life.--The General Assembly states that
13 the estimated useful life of the public improvement projects
14 itemized in this act is as follows:
15 (1) Public improvement projects, 30 years.
16 (2) Furniture and equipment projects, 10 years.
17 (3) Transportation assistance projects:
18 (i) Rolling stock, 15 years.
19 (ii) Passenger buses, 12 years.
20 (iii) Furniture and equipment, 10 years.
21 (iv) All others, 30 years.
22 (b) Term of debt.--The maximum term of the debt authorized
23 to be incurred under this act is 30 years.
24 Section 15. Appropriations.
25 (a) Public improvements.--The net proceeds of the sale of
26 the obligations authorized in this act are hereby appropriated
27 from the Capital Facilities Fund to the Department of General
28 Services in the maximum amount of $5,120,432,000 $5,972,762,000 <--
29 to be used by it exclusively to defray the financial cost of the
30 public improvement projects specifically itemized in a capital
20070H1589B4129 - 327 -
1 budget. After reserving or paying the expenses of the sale of 2 the obligation, the State Treasurer shall pay to the Department 3 of General Services the moneys as required and certified by it 4 to be legally due and payable. 5 (b) Furniture and equipment.--The net proceeds of the sale 6 of the obligations authorized in this act are hereby 7 appropriated from the Capital Facilities Fund to the Department 8 of General Services in the maximum amount of $166,346,000 <-- 9 $173,481,000 to be used by it exclusively to defray the <-- 10 financial cost of the public improvement projects consisting of 11 the acquisition of original movable furniture and equipment 12 specifically itemized in a capital budget. After reserving or 13 paying the expenses of the sale of the obligation, the State 14 Treasurer shall pay to the Department of General Services the 15 moneys as required and certified by it to be legally due and 16 payable. 17 (c) Transportation assistance.--The net proceeds of the sale 18 of the obligations authorized in this act are hereby 19 appropriated from the Capital Facilities Fund to the Department 20 of Transportation in the maximum amount of $750,939,000 <-- 21 $954,737,000 to be used by it exclusively to defray the <-- 22 financial cost of the transportation assistance projects 23 specifically itemized in a capital budget. After reserving or 24 paying the expenses of the sale of the obligation, the State 25 Treasurer shall pay to the Department of Transportation the 26 moneys as required and certified by it to be legally due and 27 payable. 28 (d) Redevelopment assistance.--The net proceeds of the sale 29 of the obligations authorized in this act are hereby 30 appropriated from the Capital Facilities Fund to the Department 20070H1589B4129 - 328 -
1 of Community and Economic Development in the maximum amount of 2 $6,482,798,000 $7,533,808,000 to be used by it exclusively to <-- 3 defray the financial cost of redevelopment assistance capital 4 projects specifically itemized in a capital budget. After 5 reserving or paying the expenses of the sale of the obligation, 6 the State Treasurer shall pay to the Department of Community and 7 Economic Development the moneys as required and certified by it 8 to be legally due and payable. 9 (e) Flood control.--The net proceeds of the sale of the 10 obligations authorized in this act are hereby appropriated from 11 the Capital Facilities Fund to the Department of Environmental 12 Protection in the maximum amount of $74,526,000 $96,199,000 to <-- 13 be used by it exclusively to defray the financial cost of the 14 flood control projects specifically itemized in a capital 15 budget. After reserving or paying the expenses of the sale of 16 the obligation, the State Treasurer shall pay to the Department 17 of Environmental Protection the moneys as required and certified 18 by it to be legally due and payable. 19 (f) Pennsylvania Fish and Boat Commission projects.--The net 20 proceeds of the sale of the obligations authorized in this act 21 are hereby appropriated from the Capital Facilities Fund to the 22 Pennsylvania Fish and Boat Commission in the maximum amount of 23 $79,100,000 to be used by it exclusively to defray the financial 24 cost of the Pennsylvania Fish and Boat Commission projects 25 specifically itemized in a capital budget. After reserving or 26 paying the expense of the sale of the obligation, the State 27 Treasurer shall pay to the Pennsylvania Fish and Boat Commission 28 the moneys as required and certified by it to be legally due and 29 payable. 30 (g) Motor License Fund projects.--The net proceeds of the 20070H1589B4129 - 329 -
1 sale of the obligations authorized in this act are hereby 2 appropriated from the Motor License Fund to the Department of 3 Transportation in the maximum amount of $24,144,000 to be used 4 by it exclusively to defray the financial cost of the Motor 5 License Fund projects specifically itemized in a capital budget. 6 After reserving or paying the expense of the sale of the 7 obligation, the State Treasurer shall pay to the Department of 8 Transportation the moneys as required and certified by it to be 9 legally due and payable. 10 Section 16. Federal funds. 11 In addition to those funds appropriated in section 15, all 12 moneys received from the Federal Government for the projects 13 specifically itemized in this act are also hereby appropriated 14 for those projects. 15 Section 17. Delegation. 16 (1) Notwithstanding any provision of law to the 17 contrary, the Department of General Services may delegate the 18 design and construction of the project contained in section 19 3(9)(ix)(A) to Drexel University. 20 (2) For the public improvement projects specifically 21 itemized in section 3(14), the Department of General Services 22 may delegate the Authority to construct, improve, equip, 23 furnish, maintain, acquire or operate such projects to the 24 Philadelphia Regional Port Authority. Notwithstanding any 25 provision of law to the contrary, the Philadelphia Regional 26 Port Authority, at its discretion and subsequent to the 27 aforementioned delegation, may contract with one or more of 28 the tenant companies leasing or operating port facilities at 29 the Port of Philadelphia for the purpose of constructing, 30 improving, equipping, furnishing, maintaining, acquiring or 20070H1589B4129 - 330 -
1 operating the public improvement projects specifically 2 itemized in section 3(14). Any project itemized in section 3 3(14) delegated to the Philadelphia Regional Port Authority 4 for which the Authority contracts with a tenant company for 5 the purpose of constructing, improving, equipping, 6 furnishing, maintaining, acquiring or operating the project 7 shall be exempt from the first paragraph of section 1 of the 8 act of May 1, 1913 (P.L.155, No.104), referred to as the 9 Separations Act, and the provisions of the act of March 3, 10 1978 (P.L.6, No.3), known as the Steel Products Procurement 11 Act, and any provisions of the law requiring the bidding of 12 projects. 13 Section 18. Department of Corrections facilities. 14 (a) Preemption of local ordinances.--Capital projects in the 15 category of public improvement projects specifically itemized 16 for the Department of Corrections in section 3(4)(i), (iii), 17 (vi), (viii), (ix), (x)(B), (xi)(B), (xii)(B), (xiii), (xiv), 18 (xv)(B), (xvi) and (xix) and section 11(1) of this act are 19 hereby authorized to be constructed, erected or acquired by the 20 Department of General Services, its successors or assigns, of 21 the Department of Corrections, notwithstanding any zoning 22 ordinance, land use ordinance, building code or other regulation 23 adopted or enacted by a political subdivision under the 24 authority of any statute or under the authority of any home rule 25 charter authorized and adopted under any statute or the 26 Constitution of Pennsylvania. 27 (b) Preemption of local ordinances for 2005-2006 projects.-- 28 Capital projects in the category of public improvement projects 29 specifically itemized for the Department of Corrections in 30 section 3(5)(iv.2)(A), (iv.4)(A) and (v.1)(A) of the act of July 20070H1589B4129 - 331 -
1 7, 2006 (P.L.390, No.83), known as the Capital Budget Project 2 Itemization Act of 2005-2006, are hereby authorized to be 3 constructed, erected or acquired by the Department of General 4 Services, its successors or assigns, of the Department of 5 Corrections, notwithstanding any zoning ordinance, land use 6 ordinance, building code or other regulation adopted or enacted 7 by a political subdivision under the authority of any statute or 8 under the authority of any home rule charter authorized and 9 adopted under any statute or the Constitution of Pennsylvania. 10 (c) Preemption of local ordinances for 2001-2002 projects.-- 11 The capital projects in the category of public improvement 12 projects specifically itemized for the Department of Corrections 13 in section 3(4)(xi)(A) of the act of October 30, 2002 (P.L.891, 14 No.131), known as the Capital Budget Project Itemization Act of 15 2001-2002, are hereby authorized to be constructed, erected or 16 acquired by the Department of General Services, its successors 17 or assigns, of the Department of Corrections, notwithstanding 18 any zoning ordinance, land use ordinance, building code or other 19 regulation adopted or enacted by a political subdivision under 20 the authority of any statute or under the authority of any home 21 rule charter authorized and adopted under any statute or the 22 Constitution of Pennsylvania. 23 Section 19. Special contract provisions for Department of 24 Corrections projects. 25 The Department of General Services shall use the competitive 26 sealed proposal method of source selection to enter into a 27 design/build contract for the projects which are authorized in 28 section 3(4)(i), (iii), (vi), (viii), (ix), (x)(B), (xi)(B), 29 (xii)(B), (xiii), (xiv), (xvi) and (xix) and section 11(1). 30 Notwithstanding the provisions of 62 Pa.C.S. § 322(6) (relating 20070H1589B4129 - 332 -
1 to specific construction powers, duties and procedures), the 2 Department of General Services shall comply with the provisions 3 of the act of May 1, 1913 (P.L.155, No.104), referred to as the 4 Separations Act, by entering into a design/build contract which 5 requires that the design/build contractor comply with the 6 requirements of the Separations Act. The Secretary of the Budget 7 shall give notification of any such design/build contracts to 8 the chairman and minority chairman of the Appropriations 9 Committee of the Senate and the chairman and minority chairman 10 of the Appropriations Committee of the House of Representatives 11 ten days prior to advertising for a developer. 12 Section 20. Special contract provisions for Department of 13 Conservation and Natural Resources projects. 14 Any Department of Conservation and Natural Resources public 15 improvement project-eligible expenditure of funds incurred prior 16 to the effective date of this act which is directly related to a 17 public improvement capital project itemized in section 3(3)(xxi) 18 shall be considered eligible to be utilized as a portion of the 19 expenditure of funds and may be considered as eligible for 20 reimbursement from capital funds for a public improvement 21 capital project itemized in section 3(3)(xxi). 22 Section 21. Department of General Services authorization. 23 (1) The Department of General Services is authorized, 24 subject to executive approval and authorization, to construct 25 the Family Court Building itemized in section 3(7)(iv)(E) by 26 contract awarded by the Department of General Services or to 27 acquire the Family Court Building by means of a lease with an 28 option to purchase. 29 (2) The Department of General Services is authorized, 30 subject to executive approval and authorization, to construct 20070H1589B4129 - 333 -
1 a terminal facility for fresh food distribution itemized in
2 section 3(8)(ii)(B) of Act 40 of 2004 by contract awarded by
3 the Department of General Services or to acquire a terminal
4 facility for fresh food distribution with an option to
5 purchase.
6 Section 22. Special provisions for Pennsylvania Fish and Boat
7 Commission projects.
8 Notwithstanding any other provision of law to the contrary,
9 the individual capital projects in the category of public
10 improvement projects to be acquired or developed by the
11 Pennsylvania Fish and Boat Commission itemized in section
12 11.2(1)(iii), (v), (vi), (vii), (viii), (ix), (x), (xi), (xii),
13 (xiii) and (xiv) may be financed by the incurring of debt
14 repayable from the General Fund pursuant to executive
15 authorizations.
16 SECTION 23. SPECIAL PROVISIONS RELATING TO CHESTER ECONOMIC <--
17 DEVELOPMENT AUTHORITY.
18 NOTWITHSTANDING ANY OTHER LAW TO THE CONTRARY, THE
19 REQUIREMENT OF SECTION 318 OF THE ACT OF FEBRUARY 9, 1999
20 (P.L.1, NO.1), KNOWN AS THE CAPITAL FACILITIES DEBT ENABLING
21 ACT, SHALL PROVIDE THE SOLE AND EXCLUSIVE REQUIREMENTS FOR
22 BIDDING ANY PORTION OF THE PROJECT ITEMIZED IN SECTION
23 6(23)(II)(B)(I) RECEIVING ANY FUNDS FROM STATE AGENCIES,
24 AUTHORITIES AND INSTRUMENTALITIES.
25 SECTION 24. REPEAL.
26 SECTION 26.1(C) OF THE ACT OF JUNE 22, 2004 (P.L.257, NO.40),
27 KNOWN AS THE CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2003-
28 2004, IS REPEALED.
29 Section 23 25. Editorial changes. <--
30 In editing and preparing this act for printing following the
20070H1589B4129 - 334 -
1 final enactment, the Legislative Reference Bureau shall insert
2 or revise letters or numbers for projects where the letters or
3 numbers are missing or require revision. The bureau shall also
4 revise the total monetary amounts for the total authorization,
5 debt authorization, appropriations and departmental totals as
6 necessary to agree with the total monetary amounts of the
7 projects.
8 Section 24 26. Effective date. <--
9 This act shall take effect July 1, 2007, or immediately,
10 whichever is later.
D9L72RZ/20070H1589B4129 - 335 -