See other bills
under the
same topic
        PRIOR PRINTER'S NOS. 1970, 2107, 2151         PRINTER'S NO. 2181

THE GENERAL ASSEMBLY OF PENNSYLVANIA


HOUSE BILL

No. 1589 Session of 2007


        INTRODUCED BY D. EVANS, JUNE 18, 2007

        AS RE-REPORTED FROM COMMITTEE ON APPROPRIATIONS, HOUSE OF
           REPRESENTATIVES, AS AMENDED, JUNE 30, 2007

                                     AN ACT

     1  Providing for the capital budget for the fiscal year 2007-2008;
     2     itemizing public improvement projects, furniture and
     3     equipment projects, transportation assistance projects,
     4     redevelopment assistance capital projects, flood control
     5     projects, Keystone Recreation, Park and Conservation Fund
     6     projects, Environmental Stewardship Fund projects, Motor
     7     License Fund projects, State forestry bridge projects,
     8     Manufacturing Fund Projects and federally funded projects to
     9     be constructed or acquired or assisted by the Department of
    10     General Services, the Department of Community and Economic
    11     Development, the Department of Conservation and Natural
    12     Resources, the Department of Environmental Protection and the
    13     Department of Transportation, together with their estimated
    14     financial costs; authorizing the incurring of debt without
    15     the approval of the electors for the purpose of financing the
    16     projects to be constructed, acquired or assisted by the
    17     Department of General Services, the Department of Community
    18     and Economic Development, the Department of Conservation and
    19     Natural Resources, the Department of Environmental Protection
    20     or the Department of Transportation; stating the estimated
    21     useful life of the projects; providing an exemption;
    22     providing for limitation on certain capital projects, for
    23     special provisions for certain redevelopment assistance
    24     capital projects and for preemption of local ordinances for
    25     Department of Corrections projects; and making
    26     appropriations.

    27     The General Assembly of the Commonwealth of Pennsylvania
    28  hereby enacts as follows:
    29  Section 1.  Short title.

     1     This act shall be known and may be cited as the Capital
     2  Budget Project Itemization Act of 2007-2008.
     3  Section 2.  Total authorizations.
     4     (a)  Public improvements.--The total authorization for the
     5  additional capital projects in the category of public
     6  improvement projects itemized in section 3 and to be acquired or
     7  constructed by the Department of General Services, its
     8  successors or assigns and to be financed by the incurring of
     9  debt shall be $1,496,841,000 $1,548,730,000.                      <--
    10     (b)  Furniture and equipment.--The total authorization for
    11  the additional capital projects in the category of public
    12  improvement projects consisting of the acquisition of original
    13  movable furniture and equipment to complete public improvement
    14  projects itemized in section 4 and to be acquired by the
    15  Department of General Services, its successors or assigns and to
    16  be financed by the incurring of debt shall be $81,846,000.
    17     (c)  Transportation assistance.--The total authorization for
    18  the capital projects in the category of transportation
    19  assistance projects itemized in section 5 with respect to which
    20  an interest is to be acquired in or constructed by the
    21  Department of Transportation, its successors or assigns and to
    22  be financed by the incurring of debt shall be $414,718,000        <--
    23  $428,978,000.                                                     <--
    24     (d)  Redevelopment assistance.--The total authorization for
    25  the additional capital projects in the category of redevelopment
    26  assistance and redevelopment assistance capital projects
    27  itemized in section 6 for capital grants by the Department of
    28  Community and Economic Development, its successors or assigns
    29  and to be financed by the incurring of debt shall be
    30  $1,340,008,000 $1,847,616,000.                                    <--
    20070H1589B2181                  - 2 -     

     1     (e)  Flood control.--The total authorization for the capital
     2  projects in the category of flood control projects itemized in
     3  section 7 and to be constructed by the Department of
     4  Environmental Protection, its successors or assigns, and to be
     5  financed by the incurring of debt, shall be $4,350,000            <--
     6  $21,726,000.                                                      <--
     7     (f)  Keystone Recreation, Park and Conservation Fund.--The
     8  total authorization for the capital projects in the category of
     9  public improvement projects itemized in section 8 and to be
    10  constructed by the Department of Conservation and Natural
    11  Resources, its successors or assigns and to be financed from
    12  current revenues in the Keystone Recreation, Park and
    13  Conservation Fund shall $28,613,000.
    14     (g)  Environmental Stewardship Fund projects.--The total
    15  authorization for the capital projects in the category of public
    16  improvement projects itemized in section 9 and to be constructed
    17  by the Department of Conservation and Natural Resources, its
    18  successors or assigns and to be financed from current revenues
    19  in the Environmental Stewardship Fund shall be $142,255,000.
    20     (h)  State forestry bridge projects.--The total authorization
    21  for the capital projects itemized in section 10 to be
    22  constructed by the Department of Conservation and Natural
    23  Resources, its successors or assigns and to be financed by oil
    24  company franchise tax revenues pursuant to 75 Pa.C.S. §
    25  9502(a)(2)(iv) (relating to imposition of tax) shall be
    26  $8,300,000.
    27     (i)  General Fund current revenue projects.--The total
    28  authorization for the capital projects in the category of public
    29  improvement projects itemized in section 11 and to be developed
    30  or constructed by the Department of General Services, its
    20070H1589B2181                  - 3 -     

     1  successors or assigns and to be financed from current revenues
     2  in the General Fund shall be $26,100,000.
     3     (j)  Manufacturing Fund current revenue projects.--The total
     4  authorization for the capital projects in the category of public
     5  improvement projects itemized in section 12 and to be
     6  constructed by the Department of General Services, its
     7  successors or assigns, and to be financed from current revenues
     8  in the Manufacturing Fund shall be $3,000,000.
     9  Section 3.  Itemization of public improvement capital projects.
    10     Additional capital projects in the category of public
    11  improvement projects to be constructed or acquired by the
    12  Department of General Services, its successors or assigns, and
    13  to be financed by the incurring of debt, are hereby itemized,
    14  together with their respective estimated financial costs, as
    15  follows:
    16                                                           Total
    17                                                          Project
    18             Project                                    Allocation
    19  (1)  Office of Administration
    20     (i)  Statewide mobile radio and microwave
    21         system
    22         (A)  Additional funds for DGS project 950-
    23             10, Statewide mobile radio and
    24             microwave system                           36,100,000
    25             (Base Project Allocation - $36,100,000)
    26  (2)  Department of Agriculture
    27     (i)  Health Diagnostic Laboratory
    28         (A)  Construct a new Pennsylvania Animal
    29             Health Diagnostic Laboratory (PADLS)
    30             with Bio-Safety Level-3 capabilities to
    20070H1589B2181                  - 4 -     

     1             support PADLS                              33,000,000
     2             (Base Project Allocation - $29,700,000)
     3             (Design and Contingencies - $3,300,000)
     4     (ii)  State Dairy Farm
     5         (A)  Rehabilitate and construct several
     6             support facilities for State dairy farm
     7             to complement existing dairy operation       500,000
     8             (Base Project Allocation - $450,000)
     9             (Design and Contingencies - $50,000)
    10     (III)  PENNSYLVANIA FAIRS                                      <--
    11         (A)  PENNSYLVANIA FAIRS MATCHING FUNDS          5,000,000
    12             (BASE PROJECT ALLOCATION - $5,000,000)
    13  (3)  Department of Conservation and Natural
    14     Resources
    15     (i)  Bald Eagle State Park
    16         (A)  Rehabilitate and develop a family
    17             campground at the State park including
    18             infrastructure                              2,000,000
    19             (Base Project Allocation - $2,000,000)
    20     (ii)  Chester County
    21         (A)  Acquire the Strawbridge Property lands
    22             in Chester County                           4,000,000
    23             (Land Allocation - $4,000,000)
    24     (iii)  Clear Creek State Park
    25         (A)  Construct new maintenance facility
    26             including infrastructure                    1,800,000
    27             (Base Project Allocation - $1,800,000)
    28     (iv)  Cook Forest State Park
    29         (A)  Replace the office/visitors' center        2,500,000
    30             (Base Project Allocation - $2,000,000)
    20070H1589B2181                  - 5 -     

     1             (Design and Contingencies - $500,000)
     2         (B)  Replace the pit latrines with modern
     3             flush facilities including
     4             infrastructure                              1,000,000
     5             (Base Project Allocation - $800,000)
     6             (Design and Contingencies - $200,000)
     7     (v)  Erie Bluffs State Park
     8         (A)  Provide for construction of the
     9             initial development of 540 acre area
    10             including infrastructure, roads,
    11             trails, parking lots and boating
    12             facilities                                 10,000,000
    13             (Base Project Allocation - $8,000,000)
    14             (Design and Contingencies - $2,000,000)
    15     (vi)  Forest District 3
    16         (A)  Rehabilitate and improve the Gunter
    17             Valley Dam to return it to a safe
    18             condition and in compliance with
    19             current requirements                        7,000,000
    20             (Base Project Allocation - $5,600,000)
    21             (Design and Contingencies - $1,400,000)
    22     (vii)  Forest District 4
    23         (A)  Repair and repave roads including
    24             returning a portion back to a gravel
    25             road                                        5,000,000
    26             (Base Project Allocation - $4,000,000)
    27             (Design and Contingencies - $1,000,000)
    28     (viii)  Forest District 7
    29         (A)  Rehabilitate roadways throughout the
    30             forest to ensure safety and to provide
    20070H1589B2181                  - 6 -     

     1             public access for outdoor activities        3,000,000
     2             (Base Project Allocation - $2,400,000)
     3             (Design and Contingencies - $600,000)
     4     (ix)  Forest District 9
     5         (A)  Rehabilitate roadways throughout the
     6             forest to ensure safety and to provide
     7             public access for outdoor activities        3,000,000
     8             (Base Project Allocation - $2,400,000)
     9             (Design and Contingencies - $600,000)
    10     (x)  Forest District 10
    11         (A)  Rehabilitate roadways throughout the
    12             forest to ensure safety and to provide
    13             public access for outdoor activities        3,000,000
    14             (Base Project Allocation - $2,400,000)
    15             (Design and Contingencies - $600,000)
    16     (xi)  Forest District 12
    17         (A)  Rehabilitate roadways throughout the
    18             forest to ensure safety and to provide
    19             public access for outdoor activities        3,000,000
    20             (Base Project Allocation - $2,400,000)
    21             (Design and Contingencies - $600,000)
    22     (xii)  Forest District 13
    23         (A)  Rehabilitate roadways throughout the
    24             forest to ensure safety and to provide
    25             public access for outdoor activities        3,000,000
    26             (Base Project Allocation - $2,400,000)
    27             (Design and Contingencies - $600,000)
    28     (xiii)  Forest District 15
    29         (A)  Rehabilitate roadways throughout the
    30             forest to ensure safety and to provide
    20070H1589B2181                  - 7 -     

     1             public access for outdoor activities        3,000,000
     2             (Base Project Allocation - $2,400,000)
     3             (Design and Contingencies - $600,000)
     4     (xiv)  Forest District 16
     5         (A)  Rehabilitate roadways throughout the
     6             forest to ensure safety and to provide
     7             public access for outdoor activities        3,000,000
     8             (Base Project Allocation - $2,400,000)
     9             (Design and Contingencies - $600,000)
    10     (xv)  Forest District 20
    11         (A)  Rehabilitate roadways throughout the
    12             forest to ensure safety and to provide
    13             public access for outdoor activities        3,000,000
    14             (Base Project Allocation - $2,400,000)
    15             (Design and Contingencies - $600,000)
    16         (B)  Rehabilitate rest facilities, parking
    17             lots and multiple use trails and
    18             refurbish living quarters as a
    19             departmental training facility with
    20             necessary equipment                         2,500,000
    21             (Base Project Allocation - $2,000,000)
    22             (Design and Contingencies - $500,000)
    23     (xvi)  Gouldsboro State Park
    24         (A)  Rehabilitate day use area and provide
    25             for the replacement of lifeguard
    26             building, bathhouse, boat rental
    27             building and comfort station including
    28             infrastructure                              2,500,000
    29             (Base Project Allocation - $2,000,000)
    30             (Design and Contingencies - $500,000)
    20070H1589B2181                  - 8 -     

     1     (xvii)  Lehigh Gorge State Park
     2         (A)  Provide for the acquisition of land
     3             necessary to complete the scheme for
     4             the park in conformance with Statewide
     5             recreation plan                             3,500,000
     6             (Land Allocation - $3,500,000)
     7     (xviii)  Montgomery County
     8         (A)  Acquire the Erdenheim Farm lands in
     9             Montgomery County                           4,000,000
    10             (Land Allocation -$4,000,000)
    11     (xix)  Nescopeck State Park
    12         (A)  Develop day use area and provide for
    13             the development of recreational and
    14             educational facilities for day use          3,000,000
    15             (Base Project Allocation - $2,500,000)
    16             (Design and Contingencies - $500,000)
    17     (xx)  Promised Land State Park
    18         (A)  Rehabilitate and improve lower lake
    19             dam to return it to a safe condition
    20             and in compliance with current
    21             requirements                                3,500,000
    22             (Base Project Allocation - $2,800,000)
    23             (Design and Contingencies - $700,000)
    24         (B)  REHABILITATION TO INFRASTRUCTURE             139,000  <--
    25             (BASE PROJECT ALLOCATION - $139,000)
    26     (xxi)  Quehanna Wild Area
    27         (A)  Provide for the remediation of land of
    28             radioactive materials within the
    29             Quehanna wild area at the former
    30             nuclear reactor site                        2,500,000
    20070H1589B2181                  - 9 -     

     1             (Base Project Allocation - $2,500,000)
     2         (B)  Facilitate the cleanup and reclamation
     3             of the Quehanna reactor site at
     4             Moshannon State Forest                      1,834,000
     5             (Base Project Allocation - $1,834,000)
     6     (xxii)  Ricketts Glen State Park
     7         (A)  Repair and repave roads including
     8             returning a portion back to a gravel
     9             road                                        3,500,000
    10             (Base Project Allocation - $2,800,000)
    11             (Design and Contingencies - $700,000)
    12     (xxiii)  S.B. Elliott State Park
    13         (A)  Additional funding to complete the
    14             visitors' center and overnight lodging
    15             including furnishings and equipment         3,500,000
    16             (Base Project Allocation - $3,500,000)
    17     (xxiv)  Shikellamy State Park
    18         (A)  Rehabilitate marina damaged by flood
    19             waters in 2005 and 2006 including new
    20             docks, railings, concrete bulkheads and
    21             courtesy docks                              1,500,000
    22             (Base Project Allocation - $1,200,000)
    23             (Design and Contingencies - $300,000)
    24  (4)  Department of Corrections
    25     (i)  State Correctional Institution at
    26         Cambridge Springs
    27         (A)  Construct a new 128-cell L-3 close
    28             security housing unit with 230-bed
    29             capacity with infrastructure upgrade       16,800,000
    30             (Base Project Allocation - $13,500,000)
    20070H1589B2181                 - 10 -     

     1             (Design and Contingencies - $3,300,000)
     2     (ii)  State Correctional Institution at Camp
     3         Hill
     4         (A)  Additional funds for DGS project 573-
     5             26, replacement of Group 1 plumbing
     6             components                                  8,000,000
     7             (Base Project Allocation - $6,400,000)
     8             (Design and Contingencies - $1,600,000)
     9         (B)  Additional funds for DGS project 573-
    10             27, provide additional funding for
    11             Phase 2 to complete the plumbing
    12             repairs started under projects 573-27
    13             to include steam pipe replacement and
    14             repairs to pipe tunnels                     6,000,000
    15             (Base Project Allocation - $4,800,000)
    16             (Design and Contingencies - $1,200,000)
    17     (iii)  State Correctional Institution at Coal
    18         Township
    19         (A)  Construct a new 128-cell L-3 close
    20             security housing unit with 230-bed
    21             capacity with infrastructure upgrade       14,500,000
    22             (Base Project Allocation - $11,600,000)
    23             (Design and Contingencies - $2,900,000)
    24     (iv)  State Correctional Institution at Cresson
    25         (A)  Renovate and upgrade the heating and
    26             air conditioning system serving the
    27             medical building                              550,000
    28             (Base Project Allocation - $440,000)
    29             (Design and Contingencies - $110,000)
    30     (v)  (Reserved)
    20070H1589B2181                 - 11 -     

     1     (vi)  State Correctional Institution at Forest
     2         (A)  Construct a new 128-cell L-5 close
     3             security housing unit with capacity
     4             with infrastructure upgrade                16,500,000
     5             (Base Project Allocation - $13,200,000)
     6             (Design and Contingencies - $3,300,000)
     7     (vii)  State Correctional Institution at
     8         Frackville
     9         (A)  Replace and upgrade the institution's
    10             main electrical switchgear                    520,000
    11             (Base Project Allocation - $416,000)
    12             (Design and Contingencies - $104,000)
    13     (viii)  State Correctional Institution at
    14         Graterford
    15         (A)  Construct a new 2,000 bed L-3 Medium
    16             Security prison on the grounds of SCI
    17             Graterford including infrastructure and
    18             road work to incorporate the two
    19             facilities at this site                   200,000,000
    20             (Base Project Allocation -
    21             $160,000,000)
    22             (Design and Contingencies -
    23             $40,000,000)
    24     (ix)  State Correctional Institution at
    25         Huntingdon
    26         (A)  Construct a new 2,000 bed L-3 Medium
    27             Security prison on the grounds of SCI
    28             Huntingdon including infrastructure and
    29             road work to incorporate the two
    30             facilities at this site                   200,000,000
    20070H1589B2181                 - 12 -     

     1             (Base Project Allocation -
     2             $160,000,000)
     3             (Design and Contingencies -
     4             $40,000,000)
     5     (x)  State Correctional Institution at Laurel
     6         Highlands
     7         (A)  Replace roofs on dietary building No.4
     8             and housing unit building C                   800,000
     9             (Base Project Allocation - $640,000)
    10             (Design and Contingencies - $160,000)
    11         (B)  Additional funds for DGS Project 376-
    12             5, construct a new 230-bed capacity
    13             facility and upgrade infrastructure and
    14             security                                    1,500,000
    15             (Base Project Allocation - $1,200,000)
    16             (Design and Contingencies - $300,000)
    17     (xi)  State Correctional Institution at Mercer
    18         (A)  Replace roofs on medical building, M
    19             Block and G Block                             650,000
    20             (Base Project Allocation - $520,000)
    21             (Design and Contingencies - $130,000)
    22         (B)  Additional funds for DGS Project 1572-
    23             10, construct a new 230-bed capacity
    24             facility and upgrade infrastructure and
    25             security                                    4,000,000
    26             (Base Project Allocation - $3,200,000)
    27             (Design and Contingencies - $800,000)
    28     (xii)  State Correctional Institution at Muncy
    29         (A)  Replace roofs on Administration
    30             building, Laundry building, Storeroom
    20070H1589B2181                 - 13 -     

     1             building, Kitchen building, and housing
     2             units A Block, M Block, K Block and F
     3             Block                                       2,300,000
     4             (Base Project Allocation - $1,840,000)
     5             (Design and Contingencies - $460,000)
     6         (B)  Additional funds for DGS Project 574-
     7             26, addition of two new cell blocks for
     8             close security, expansion of infirmary,
     9             outside warehouse, electrical and
    10             boiler upgrades; also including funds
    11             for utility upgrades and kitchen and
    12             dining room expansion                       7,200,000
    13             (Base Project Allocation - $5,800,000)
    14             (Design and Contingencies - $1,400,000)
    15     (xiii)  State Correctional Institution at Pine
    16         Grove
    17         (A)  Construct a new 128-cell L-3 close
    18             security housing unit with 230-bed
    19             capacity with infrastructure upgrade       14,500,000
    20             (Base Project Allocation - $11,600,000)
    21             (Design and Contingencies - $2,900,000)
    22     (xiv)  State Correctional Institution at
    23         Rockview
    24         (A)  Construct a new 2,000 bed L-3 Medium
    25             Security prison on the grounds of SCI
    26             Rockview including infrastructure and
    27             road work to complete the two
    28             facilities at this site                   200,000,000
    29             (Base Project Allocation -
    30             $160,000,000)
    20070H1589B2181                 - 14 -     

     1             (Design and Contingencies -
     2             $40,000,000)
     3     (xv)  State Correctional Institution at
     4         Smithfield
     5         (A)  Additional funds for DGS Project 1573-
     6             7, expand kitchen/dining facility           2,500,000
     7             (Base Project Allocation - $2,000,000)
     8             (Design and Contingencies - $500,000)
     9         (B)  Additional funds for DGS Project 1573-
    10             9, construct a new 230-bed capacity
    11             facility and upgrade infrastructure and
    12             security                                    4,000,000
    13             (Base Project Allocation - $3,200,000)
    14             (Design and Contingencies - $800,000)
    15     (xvi)  New State Correctional Institution in
    16         Luzerne County
    17         (A)  Construct a new 2,300-bed L-3 medium
    18             security prison within a five-mile
    19             radius of SCI Retreat. Includes
    20             construction of all other facilities as
    21             necessary to operate institution          200,000,000
    22             (Base Project Allocation -
    23             $160,000,000)
    24             (Design and Contingencies -
    25             $40,000,000)
    26     (XVII)  CORRECTIONS TRAINING RIFLE RANGE AND                   <--
    27         INDOOR HAND GUN RANGE
    28         (A)  CONSTRUCTION OF A CORRECTIONS TRAINING
    29             RIFLE RANGE AND INDOOR HAND GUN RANGE       2,000,000
    30             (BASE PROJECT ALLOCATION - $2,000,000)
    20070H1589B2181                 - 15 -     

     1  (5)  Department of Education
     2     (i)  Scranton State School for the Deaf
     3         (A)  Provide improvements and upgrades to
     4             the emergency, mechanical and
     5             electrical systems throughout the
     6             campus                                      7,560,000
     7             (Base Project Allocation - $6,574,000)
     8             (Design and Contingencies - $986,000)
     9     (ii)  Pennsylvania State University
    10         (A)  Provide for the capital renewal for
    11             campuses in the eastern region of the
    12             university including code compliances
    13             and infrastructure upgrades                 7,000,000
    14             (Base Project Allocation - $7,000,000)
    15         (B)  Provide for the capital renewal for
    16             campuses in the central region of the
    17             university including code compliances
    18             and infrastructure upgrades                 7,000,000
    19             (Base Project Allocation - $7,000,000)
    20         (C)  Provide for the capital renewal for
    21             campuses in the western region of the
    22             university including code compliances
    23             and infrastructure upgrades                 7,000,000
    24             (Base Project Allocation - $7,000,000)
    25     (iii)  University of Pennsylvania
    26         (A)  Construction of a Center for
    27             Nanotechnology Research and
    28             Development                                30,000,000
    29             (Base Project Allocation - $30,000,000)
    30         (B)  Construction of a new Life Sciences
    20070H1589B2181                 - 16 -     

     1             Building                                   16,000,000
     2             (Base Project Allocation - $16,000,000)
     3     (iv)  University of Pittsburgh
     4         (A)  Providing for upgrades and deferred
     5             maintenance needs on all campuses          20,000,000
     6             (Base Project Allocation - $16,667,000)
     7             (Design and Contingencies - $3,333,000)
     8         (B)  Construction and other related costs
     9             for the renovation of the Manufacturing
    10             Assistance Center                             375,000
    11     (v)   Lincoln University
    12         (A)  Renovate Langston Hughes Library and
    13             correct problems from structural design
    14             flaws                                       7,000,000
    15             (Base Project Allocation - $5,600,000)
    16             (Design and Contingencies - $1,400,000)
    17         (B)  Renovate Wright Hall building systems,
    18             classrooms and laboratory including ADA
    19             requirements                                4,000,000
    20             (Base Project Allocation - $3,200,000)
    21             (Design and Contingencies - $800,000)
    22     (vi)  Luzerne County Community College
    23         (A)  Construction, infrastructure and other
    24             related costs for a public safety
    25             institute                                   1,000,000
    26         (B)  Acquisition, construction,
    27             infrastructure and other related costs
    28             for student housing                         2,000,000
    29         (C)  Acquisition, construction,
    30             infrastructure and other related costs
    20070H1589B2181                 - 17 -     

     1             for a new culinary arts building with
     2             parking                                     3,000,000
     3     (VII)  NORTHAMPTON COMMUNITY COLLEGE                           <--
     4         (A)  MONROE CAMPUS, CONSTRUCTION OF NEW
     5             CAMPUS TO INCREASE THE AVAILABILITY OF
     6             ACADEMIC SQUARE FOOTAGE                    44,000,000
     7             (BASE PROJECT ALLOCATION - $44,000,000)
     8     (VIII)  MONTGOMERY COUNTY COMMUNITY COLLEGE
     9         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    10             RELATED COSTS TO EXPAND THE SCIENCE
    11             CENTER                                        750,000
    12             (BASE PROJECT ALLOCATION - $750,000)
    13     (vii) (ix)  Thaddeus Stevens College of                        <--
    14         Technology
    15         (A)  Construction and other related costs
    16             for the Thaddeus Stevens Technology
    17             Center                                      4,000,000
    18     (viii) (x)  Westmoreland Community College                     <--
    19         (A)  Construction and other related costs
    20             for Alle-Kiski Education Center             2,500,000
    21     (ix) (xi)  York Community College                              <--
    22         (A)  Acquisition, construction,
    23             infrastructure and other related costs
    24             for downtown York Community College
    25             campus                                      7,000,000
    26  (6)  Department of Environmental Protection
    27     (i)  Bucks County
    28         (A)  Construction, infrastructure and other
    29             related costs for Bristol Borough flood
    30             protection project                          3,000,000
    20070H1589B2181                 - 18 -     

     1     (ii)  Cambria County
     2         (A)  Additional funds for Patton Flood
     3             Project to the upstream section and
     4             remove existing levee in the downstream
     5             section                                     3,600,000
     6             (Base Project Allocation - $3,000,000)
     7             (Design and Contingencies - $600,000)
     8         (B)  Construct Lancashire No.15 acid mine
     9             drainage treatment plant to improve an
    10             estimated 25 miles of the west branch
    11             of the Susquehanna River                   10,025,000
    12             (Base Project Allocation - $10,025,000)
    13     (iii)  Clearfield County
    14         (A)  Construction and other related costs
    15             for stream channel clearing and
    16             restoration in Curwensville Borough         5,000,000
    17     (iv)  Clearfield and/or Cambria County
    18         (A)  Construct active acid mine drainage
    19             facility for currently untreated mine
    20             pool discharge in the Susquehanna River
    21             basin to offset agricultural
    22             consumptive use demands                     6,000,000
    23             (Base Project Allocation - $6,000,000)
    24     (v)  Clearfield and Elk Counties
    25         (A)  Construct active acid mine drainage
    26             facility near the Village of Hollywood,
    27             Huston Township, Clearfield County, to
    28             restore water quality in the Bennett
    29             Branch Sinnemahoning Creek in support
    30             of the PA Wilds initiative                 12,125,000
    20070H1589B2181                 - 19 -     

     1             (Base Project Allocation - $12,125,000)
     2     (vi)  Delaware County
     3         (A)  Construction, infrastructure and other
     4             related costs for Edgemount Square in
     5             Newtown Township - stormwater
     6             management project                            300,000
     7         (B)  Construction, infrastructure and other
     8             related costs for the Radnor Middle
     9             School stormwater management project          300,000
    10         (C)  Construction, infrastructure and other
    11             related costs for stormwater management
    12             in Ridley Township                            500,000
    13     (vii)  Fulton County
    14         (A)  Reconstruct two streams currently
    15             flowing into abandoned surface mine
    16             pits in order to restore the natural
    17             stream flow to the Great Trough Creek       2,000,000
    18             (Base Project Allocation - $2,000,000)
    19     (viii)  Greene County
    20         (A)  Construction, infrastructure and other
    21             related costs for Wisecarver Dam
    22             rehabilitation in Franklin Township         1,500,000
    23     (ix)  Indiana County
    24         (A)  Construct active acid mine drainage
    25             facility near the abandoned Wehrum
    26             shaft to treat discharges from two
    27             abandoned mine complexes discharging to
    28             Blacklick Creek                             6,000,000
    29             (Base Project Allocation - $6,000,000)
    30     (x)  Luzerne County
    20070H1589B2181                 - 20 -     

     1         (A)  Additional funds for DGS Project 184-
     2             23, flood control project on Mill
     3             Creek, Avoca Borough                        1,200,000
     4             (Base Project Allocation - $1,000,000)
     5             (Design and Contingencies - $200,000)
     6         (B)  Construction and other costs related
     7             to repair and improve Wade Run in
     8             Swoyersville Borough                          500,000
     9         (C)  Construction, infrastructure and other
    10             related costs for the Ashley Solomon
    11             Creek Tunnel Project                          750,000
    12     (xi)  Montgomery County
    13         (A)  Construction and other related costs
    14             for the Ardsley Drainage Project in
    15             upper Dublin Township                       2,000,000
    16  (7)  Department of General Services
    17     (i)  Dauphin County
    18         (A)  Provide for steam plant replacements
    19             and upgrades in Capitol Annex               1,563,000
    20             (Base Project Allocation - $1,250,000)
    21             (Design and Contingencies - $313,000)
    22         (B)  Provide for remediation of mold,
    23             asbestos and other hazmat in buildings
    24             and equipment areas in Capitol Annex        5,625,000
    25             (Base Project Allocation - $4,500,000)
    26             (Design and Contingencies - $1,125,000)
    27         (C)  Upgrade building heating system and
    28             install new air conditioning system in
    29             Capitol Annex                               3,750,000
    30             (Base Project Allocation - $3,000,000)
    20070H1589B2181                 - 21 -     

     1             (Design and Contingencies - $750,000)
     2         (D)  Replace main Capitol Complex
     3             Substation switchgears including
     4             control status board along with
     5             transformers and circuit breakers          25,000,000
     6             (Base Project Allocation - $20,000,000)
     7             (Design and Contingencies - $5,000,000)
     8         (E)  Replace existing 15kv distribution
     9             feeders throughout the Capitol Complex
    10             and reset the system primary and
    11             secondary circuit breakers for proper
    12             overall system coordination                10,625,000
    13             (Base Project Allocation - $8,500,000)
    14             (Design and Contingencies - $2,125,000)
    15         (F)  Refurbish Capital Park by providing
    16             for a new retaining wall along Walnut
    17             Street including new grading and
    18             installation of a water conduction
    19             system                                      1,000,000
    20             (Base Project Allocation - $750,000)
    21             (Design and Contingencies - $250,000)
    22         (G)  Replace all cloth ceilings in halls of
    23             the Capitol East Wing                       1,000,000
    24             (Base Project Allocation - $750,000)
    25             (Design and Contingencies - $250,000)
    26         (H)  Replace existing macadam with new
    27             covering and sealant to prevent water
    28             leakage and replace drains and piping
    29             at the parking facility at 22nd and
    30             Forster Streets, Harrisburg                 1,100,000
    20070H1589B2181                 - 22 -     

     1             (Base Project Allocation - $880,000)
     2             (Design and Contingencies - $220,000)
     3         (I)  Repair the roof membrane and replace
     4             broken pavers at the Rachel Carson
     5             State Office Building                         750,000
     6             (Base Project Allocation - $600,000)
     7             (Design and Contingencies - $150,000)
     8  (8)  Pennsylvania Historical and Museum Commission
     9     (i)  Daniel Boone Homestead
    10         (A)  Provide for site improvements and
    11             restore the boyhood home of Daniel
    12             Boone                                         960,000
    13             (Base Project Allocation - $800,000)
    14             (Design and Contingencies - $160,000)
    15     (ii)  Landis Valley Museum
    16         (A)  Provide for the design and
    17             construction of a new maintenance
    18             building                                      960,000
    19             (Base Project Allocation - $800,000)
    20             (Design and Contingencies - $160,000)
    21     (iii)  Pennsbury Manor
    22         (A)  Rehabilitate up to 23 buildings and
    23             site development of infrastructure
    24             throughout the site                         1,920,000
    25             (Base Project Allocation - $1,600,000)
    26             (Design and Contingencies - $320,000)
    27     (iv)  Pennsylvania Lumber Museum
    28         (A)  Reconfigure entrance to the building
    29             to permit one coordinated exhibit
    30             gallery rather than two disjointed
    20070H1589B2181                 - 23 -     

     1             galleries                                   2,400,000
     2             (Base Project Allocation - $2,000,000)
     3             (Design and Contingencies - $400,000)
     4  (9)  Department of Military and Veterans Affairs
     5     (i)  Pittsburgh Hunt Readiness Center,
     6         Allegheny County
     7         (A)  Rehabilitate readiness center
     8             including assembly hall, classrooms,
     9             administrative offices, storage spaces,
    10             restrooms, locker rooms and mechanical
    11             rooms                                       3,000,000
    12             (Base Project Allocation - $2,400,000)
    13             (Design and Contingencies - $600,000)
    14     (ii)  Southwestern Veterans Center, Allegheny
    15         County
    16         (A)  Replace sewer main                           331,000
    17             (Base Project Allocation - $248,000)
    18             (Design and Contingencies - $83,000)
    19     (iii)  Hollidaysburg Veterans Home, Blair
    20         County
    21         (A)  Rehabilitate fire alarm and sprinkler
    22             systems in Arnold, Dietary, Eisenhower
    23             and MacArthur Halls to meet life safety
    24             compliance                                  2,722,000
    25             (Base Project Allocation - $2,268,000)
    26             (Design and Contingencies - $454,000)
    27     (iv)  Harrisburg Military Post, Dauphin County
    28         (A)  Rehabilitate various buildings and
    29             facilities on the military post
    30             including assembly halls, classrooms,
    20070H1589B2181                 - 24 -     

     1             administrative offices, storage spaces,
     2             restrooms, locker rooms, mechanical
     3             rooms and expanded parking                  6,000,000
     4             (Base Project Allocation - $4,800,000)
     5             (Design and Contingencies - $1,200,000)
     6     (v)  Wilkes-Barre Readiness Center, Luzerne
     7         County
     8         (A)  Rehabilitate readiness center
     9             including assembly hall, classrooms,
    10             administrative offices, storage spaces,
    11             restrooms, locker rooms, mechanical
    12             rooms and rehabilitation and expansion
    13             of parking                                  4,000,000
    14             (Base Project Allocation - $3,200,000)
    15             (Design and Contingencies - $800,000)
    16     (vi)  Southeastern Veterans Center, Montgomery
    17         County
    18         (A)  Rehabilitate fire alarm and sprinkler
    19             systems to meet life safety compliance      1,276,000
    20             (Base Project Allocation - $1,063,000)
    21             (Design and Contingencies - $213,000)
    22     (vii)  Philadelphia Lancaster Avenue Readiness
    23         Center, Philadelphia County
    24         (A)  Rehabilitate readiness center to
    25             include assembly hall, classrooms,
    26             administrative offices, storage spaces,
    27             restrooms, locker rooms and mechanical
    28             rooms                                       6,000,000
    29             (Base Project Allocation - $5,000,000)
    30             (Design and Contingencies - $1,000,000)
    20070H1589B2181                 - 25 -     

     1     (viii)  Philadelphia Southampton Road Armory,
     2         Philadelphia County
     3         (A)  Replace several air handling units and
     4             associated pumps and motors and install
     5             new chiller with ice storage capacity
     6             to be made at night that will
     7             distribute cooling during the day           1,500,000
     8             (Base Project Allocation - $1,300,000)
     9             (Design and Contingencies - $200,000)
    10     (ix)  Keystone Lodge, Lebanon County
    11         (A)  Construction, infrastructure and other
    12             related costs                               1,300,000
    13  (10)  Department of Public Welfare
    14     (i)  Allentown State Hospital
    15         (A)  Upgrade three coal boilers currently
    16             in poor condition and replace traveling
    17             grate stokers and controls                  3,600,000
    18             (Base Project Allocation - $3,000,000)
    19             (Design and Contingencies - $600,000)
    20     (ii)  Clarks Summit State Hospital
    21         (A)  Replace the electrical distribution
    22             center at the sewage treatment plant
    23             and install new 400 amp service, motor
    24             control center, new transformer and new
    25             back-up supply                              1,200,000
    26             (Base Project Allocation - $1,000,000)
    27             (Design and Contingencies - $200,000)
    28     (iii)  Ebensburg Center
    29         (A)  Replace all roofed areas which cover
    30             residential housing units                   1,440,000
    20070H1589B2181                 - 26 -     

     1             (Base Project Allocation - $1,200,000)
     2             (Design and Contingencies - $240,000)
     3         (B)  Replace current emergency generators
     4             with stand alone outside units in all
     5             seven residential units                     1,500,000
     6             (Base Project Allocation - $1,250,000)
     7             (Design and Contingencies - $250,000)
     8     (iv)  Loysville Youth Development Center
     9         (A)  Construct a modular multipurpose
    10             gym/kitchen/classroom building              3,000,000
    11             (Base Project Allocation - $2,500,000)
    12             (Design and Contingencies - $500,000)
    13     (v)  Loysville Complex, South Mountain Secure
    14         Treatment Unit
    15         (A)  Construct a modular multipurpose
    16             gym/kitchen/classroom building              3,000,000
    17             (Base Project Allocation - $2,500,000)
    18             (Design and Contingencies - $500,000)
    19     (vi)  Mayview State Hospital
    20         (A)  Upgrade the primary electrical system
    21             including all central feeder circuits       3,000,000
    22             (Base Project Allocation - $2,500,000)
    23             (Design and Contingencies - $500,000)
    24     (vii)  Norristown State Hospital
    25         (A)  Renovate the boiler plant for building
    26             60, Phase 3 of DGS project 509-29,
    27             reconstruction or replacement of
    28             boilers to meet emissions requirements
    29             and upgrade the steam distribution
    30             system                                      1,800,000
    20070H1589B2181                 - 27 -     

     1             (Base Project Allocation - $1,500,000)
     2             (Design and Contingencies - $300,000)
     3     (viii)  Polk Center
     4         (A)  Replace valves, backwash pump and
     5             replenish filters with new media in
     6             order to keep water plant in compliance
     7             with regulations                            1,400,000
     8             (Base Project Allocation - $1,120,000)
     9             (Design and Contingencies - $280,000)
    10     (ix)  Selinsgrove Center
    11         (A)  Upgrade the boiler controls for the
    12             facility                                      600,000
    13             (Base Project Allocation - $500,000)
    14             (Design and Contingencies - $100,000)
    15         (B)  Purchase and install package boiler
    16             for more efficient handling of summer
    17             steam load                                    960,000
    18             (Base Project Allocation - $800,000)
    19             (Design and Contingencies - $160,000)
    20     (x)  South Mountain Restoration Center
    21         (A)  Purchase and install package boiler
    22             for more efficient handling of summer
    23             steam load                                    840,000
    24             (Base Project Allocation - $700,000)
    25             (Design and Contingencies - $140,000)
    26     (xi)  Torrance State Hospital
    27         (A)  Bore two horizontal wells into a
    28             mountainside to expand and improve
    29             freshwater collection                         720,000
    30             (Base Project Allocation - $600,000)
    20070H1589B2181                 - 28 -     

     1             (Design and Contingencies - $120,000)
     2     (xii)  Wernersville State Hospital
     3         (A)  Upgrade coal boiler refractory and
     4             structural components                         360,000
     5             (Base Project Allocation - $300,000)
     6             (Design and Contingencies - $60,000)
     7     (xiii)  White Haven Center
     8         (A)  Replace the heating systems in
     9             residential buildings from existing old
    10             radiant heat to more modern, digitally-
    11             controlled, high-efficiency HVAC
    12             systems                                     2,400,000
    13             (Base Project Allocation - $2,000,000)
    14             (Design and Contingencies - $400,000)
    15  (11)  Pennsylvania State Police
    16     (i)  Dunmore Headquarters, Lackawanna County
    17         (A)  Construct a new headquarters facility,
    18             garage and hangar to replace existing
    19             facilities in Lackawanna County            10,800,000
    20             (Base Project Allocation - $9,000,000)
    21             (Design and Contingencies - $1,800,000)
    22  (12)  State System of Higher Education
    23     (i)  Bloomsburg University of Pennsylvania
    24         (A)  Additional funding for the renovation
    25             of the Nelson Field House while
    26             providing additional athletic and
    27             office space                                1,000,000
    28     (ii)  Cheyney University of Pennsylvania
    29         (A)  Additional funding to replace Browne
    30             Hall including upgrading infrastructure
    20070H1589B2181                 - 29 -     

     1             according to modern codes and fire
     2             safety code requirements                    1,000,000
     3     (iii)  California University of Pennsylvania
     4         (A)  Construction and other related costs
     5             to upgrade university stadium
     6             facilities                                    250,000
     7     (iv)  East Stroudsburg University of
     8             Pennsylvania
     9         (A)  Additional funding for the replacement
    10             of Rosenkrans Hall, providing
    11             additional classroom, laboratory and
    12             office space                                8,000,000
    13         (B)  Construction and other costs related
    14             to the East Stroudsburg University
    15             Conference Center                           2,000,000
    16         (C)  Construction and other related costs
    17             to build a parking deck to serve East
    18             Stroudsburg University and Pocono
    19             Medical Center                              3,500,000
    20     (v)  Edinboro University of Pennsylvania
    21         (A)  Renovate or replace Ross Hall
    22             including infrastructure and exterior
    23             surfaces                                   10,000,000
    24     (vi)  Lock Haven University of Pennsylvania
    25         (A)  Costs associated with furniture and
    26             equipment for a new indoor athletic
    27             facility                                    1,000,000
    28  (13)  Department of Transportation
    29     (i)  Clearfield County
    30         (A)  Replace or rehabilitate District 2-0
    20070H1589B2181                 - 30 -     

     1             Office including an addition on current
     2             site and infrastructure improvements       12,000,000
     3             (Base Project Allocation - $10,000,000)
     4             (Design and Contingencies - $2,000,000)
     5     (ii)  Dauphin County
     6         (A)  Construct or acquire a new county
     7             maintenance facility including salt and
     8             equipment storage buildings and site
     9             development                                13,800,000
    10             (Base Project Allocation - $11,000,000)
    11             (Land Allocation - $1,000,000)
    12             (Design and Contingencies - $1,800,000)
    13         (B)  Construct or acquire a new PennDOT
    14             driver and motor vehicle central
    15             office/service center including design,
    16             site acquisition and construction          58,000,000
    17             (Base Project Allocation - $50,000,000)
    18             (Land Allocation - $3,000,000)
    19             (Design and Contingencies - $5,000,000)
    20     (iii)  Mifflin County
    21         (A)  Construct or acquire a new county
    22             maintenance facility including salt and
    23             equipment storage buildings and site
    24             development                                13,800,000
    25             (Base Project Allocation - $11,000,000)
    26             (Land Allocation - $1,000,000)
    27             (Design and Contingencies - $1,800,000)
    28     (iv)  Wyoming County
    29         (A)  Construct or acquire a new county
    30             maintenance facility including salt and
    20070H1589B2181                 - 31 -     

     1             equipment storage buildings and site
     2             development                                13,800,000
     3             (Base Project Allocation - $11,000,000)
     4             (Land Allocation - $1,000,000)
     5             (Design and Contingencies - $1,800,000)
     6  Section 4.  Itemization of furniture and equipment projects.
     7     Additional capital projects in the category of public
     8  improvement projects consisting of the acquisition of movable
     9  furniture and equipment to complete public improvement projects
    10  and to be purchased by the Department of General Services, its
    11  successors or assigns and to be financed by the incurring of
    12  debt are hereby itemized, together with their respective
    13  estimated financial costs, as follows:
    14                                                           Total
    15                                                          Project
    16             Project                                    Allocation
    17  (1)  Office of Administration
    18     (i)  Statewide mobile radio and microwave
    19         system
    20         (A)  Additional funds for original
    21             furniture and equipment to make the
    22             Statewide radio and microwave system
    23             DGS project 950-10 operational             21,000,000
    24  (2)  Department of Conservation and Natural
    25     Resources
    26     (i)  Benjamin Rush State Park
    27         (A)  Original furniture and equipment for
    28             current capital projects                      217,000
    29     (ii)  Cook Forest State Park
    30         (A)  Original furniture and equipment for
    20070H1589B2181                 - 32 -     

     1             current capital projects                      114,000
     2     (iii)  Delaware Canal State Park
     3         (A)  Original furniture and equipment for
     4             current capital projects                      200,000
     5     (iv)  Kinzua Bridge State Park
     6         (A)  Original furniture and equipment for
     7             current capital projects                    3,000,000
     8     (v)  Nescopeck State Park
     9         (A)  Original furniture and equipment for
    10             current capital projects                      150,000
    11     (vi)  Pine Grove Furnace State Park
    12         (A)  Original furniture and equipment for
    13             current capital projects                      200,000
    14     (vii)  Presque Isle State Park
    15         (A)  Original furniture and equipment for
    16             current capital projects                      400,000
    17     (viii)  Sinnemahoning State Park
    18         (A)  Original furniture and equipment for
    19             current capital projects                    2,000,000
    20  (3)  Department of Corrections
    21     (i)  (Reserved)
    22     (ii)  State Correctional Institution at
    23         Graterford
    24         (A)  Original furniture and equipment for
    25             the new institution at SCI Graterford       6,500,000
    26     (iii)  State Correctional Institution at
    27         Huntingdon
    28         (A)  Original furniture and equipment for
    29             the new institution at SCI Huntingdon       6,500,000
    30     (iv)  State Correctional Institution at
    20070H1589B2181                 - 33 -     

     1         Rockview
     2         (A)  Original furniture and equipment for
     3             the new institution                         6,500,000
     4     (v)  New State Correctional Institution in
     5         Luzerne County
     6         (A)  Original furniture and equipment for
     7             the new institution within a five-mile
     8             radius of SCI Retreat                       6,500,000
     9  (4)  Department of Education
    10     (i)  Scranton School for the Deaf
    11         (A)  Movable furniture and equipment to
    12             allow modernization of classrooms and
    13             other buildings to meet current
    14             standards                                   2,625,000
    15     (ii)  Lincoln University
    16         (A)  Movable furniture and equipment to
    17             allow construction project at Wright
    18             Hall to become operational                  3,000,000
    19         (B)  Movable furniture and equipment at
    20             Langston Hughes Library for use for the
    21             completely renovated facility               4,000,000
    22  (4.1)  Department of Military and Veterans Affairs
    23     (i)  Keystone Lodge at Fort Indiantown Gap
    24         (A)  Original furniture and equipment             500,000
    25  (5)  Pennsylvania Historical and Museum Commission
    26     (i)  Eckley Miners' Village
    27         (A)  Replacement of original furniture and
    28             equipment associated with the visiting
    29             public                                      1,920,000
    30     (ii)  Graeme Park
    20070H1589B2181                 - 34 -     

     1         (A)  Original furniture and equipment
     2             associated with the new orientation
     3             exhibit                                       720,000
     4     (iii)  Landis Valley Museum
     5         (A)  Construct new museum exhibits for the
     6             expanded visitors' center building and
     7             other buildings                             1,800,000
     8     (iv)  State Records Center
     9         (A)  Original furniture and equipment
    10             including a mobile high density storage
    11             system                                      1,800,000
    12  (6)  State System of Higher Education
    13     (i)  Kutztown University of Pennsylvania
    14         (A)  Supplemental funding for the purchase
    15             of movable furniture and equipment to
    16             allow Schaffer Auditorium construction
    17             project to become operational                 500,000
    18     (ii)  Lock Haven University of Pennsylvania
    19         (A)  Construction and other costs
    20             associated with building a new indoor
    21             athletic facility                          10,000,000
    22     (iii)  Millersville University of Pennsylvania
    23         (A)  Supplemental funding for the purchase
    24             of movable furniture and equipment to
    25             allow Theatre Arts Education Building
    26             construction project to become
    27             operational                                   200,000
    28     (iv)  Shippensburg University of Pennsylvania
    29         (A)  Supplemental funding for the purchase
    30             of movable furniture and equipment to
    20070H1589B2181                 - 35 -     

     1             allow Huber Arts Center construction
     2             project to become operational                 500,000
     3     (v)  Slippery Rock University of Pennsylvania
     4         (A)  Supplemental funding for the purchase
     5             of movable furniture and equipment to
     6             allow Performing Arts Center
     7             construction project to become
     8             operational                                 1,000,000
     9  Section 5.  Itemization of transportation assistance projects.
    10     (a)  Mass transit.--Additional capital projects in the
    11  category of transportation assistance projects for mass transit
    12  in which an interest is to be acquired or constructed by the
    13  Department of Transportation, its successors or assigns and to
    14  be financed by the incurring of debt are hereby itemized,
    15  together with their estimated financial costs, as follows:
    16                                                           Total
    17                                                          Project
    18             Project                                    Allocation
    19  (1)  Beaver County Transit Authority
    20     (i)  Provide for improvements in bus
    21         circulation, passenger waiting and terminal
    22         areas at the Rochester Transportation
    23         Center (RTC), pedestrian improvements with
    24         the Transit Revitalization Investment
    25         District (TRID) area and from the RTC to
    26         the Rochester riverfront development and
    27         signal preemption/prioritization request
    28         system in the TRID area                           317,000
    29             (Base Project Allocation - $285,000)
    30             (Design and Contingencies - $32,000)
    20070H1589B2181                 - 36 -     

     1  (2)  Berks Area Reading Transit Authority
     2     (i)  Purchase and install an Auto Vehicle
     3         Locator System for both fixed route and
     4         paratransit systems                               167,000
     5             (Base Project Allocation - $150,000)
     6             (Design and Contingencies -$17,000)
     7  (3)  Cambria County Transit Authority
     8     (i)  Replace bus wash system, upgrade
     9         communication system and purchase security
    10         surveillance system                               100,000
    11             (Base Project Allocation - $90,000)
    12             (Design and Contingencies - $10,000)
    13     (ii)  Construct rural transfer center to
    14         increase service efficiency, attract new
    15         riders and provide easier transfers for
    16         riders                                            100,000
    17             (Base Project Allocation - $90,000)
    18             (Design and Contingencies - $10,000)
    19  (4)  Capital Area Transit
    20     (i)  Improve and renovate CAT's maintenance
    21         building to include three bays to repair
    22         and service 40-foot low floor buses               233,000
    23             (Base Project Allocation - $210,000)
    24             (Design and Contingencies - $23,000)
    25  (5)  Centre Area Transportation Authority
    26     (i)  Purchase 16 buses to replace buses which
    27         have met their useful life                        167,000
    28             (Base Project Allocation - $150,000)
    29             (Design and Contingencies - $17,000)
    30     (ii)  Purchase automatic vehicle locator system
    20070H1589B2181                 - 37 -     

     1         with the first phase to equip buses and
     2         service vehicles with such items as the
     3         automatic enunciators, electronic
     4         performance monitoring, stop-by-stop
     5         passenger counts, real time passenger
     6         information via the Internet and at major
     7         stops                                             156,000
     8             (Base Project Allocation - $140,000)
     9             (Design and Contingencies - $16,000)
    10  (6)  Crawford Area Transportation Authority
    11     (i)  Construct administrative intermodal center
    12         in downtown Meadville and purchase bus
    13         related equipment                                 333,000
    14             (Base Project Allocation - $300,000)
    15             (Design and Contingencies - $33,000)
    16  (6.1)  ELIZABETHTOWN INTERMODAL TRANSPORTATION                    <--
    17     CENTER
    18     (I)  CONSTRUCTION OF A HIGH-LEVEL PLATFORM AND
    19         ELEVATORS AT EXISTING ELIZABETHTOWN TRAIN
    20         STATION                                         2,000,000
    21             (BASE PROJECT ALLOCATION - $2,000,000)
    22     (II)  CONSTRUCTION OF A NEW PARKING GARAGE
    23         ADJACENT TO INTERMODAL TRANSPORTATION
    24         CENTER                                          4,000,000
    25             (BASE PROJECT ALLOCATION - $4,000,000)
    26  (7)  Erie Metropolitan Transit Authority
    27     (i)  Acquire five buses to replace five
    28         existing buses which have exceeded their
    29         useful life                                       379,000
    30             (Base Project Allocation - $341,000)
    20070H1589B2181                 - 38 -     

     1             (Design and Contingencies - $38,000)
     2     (ii)  Renovate administration/maintenance
     3         facility and purchase shop and
     4         miscellaneous equipment                            39,000
     5             (Base Project Allocation - $35,000)
     6             (Design and Contingencies - $4,000)
     7     (iii)  Purchase technology upgrades to radio
     8         and fare box systems and complete system
     9         wide signage                                       33,000
    10             (Base Project Allocation - $30,000)
    11             (Design and Contingencies - $3,000)
    12  (7.1)  INDIANA COUNTY TRANSIT AUTHORITY                           <--
    13     (I)  RENOVATION AND EXPANSION OF BUS GARAGE
    14         PROJECT                                           260,000
    15             (BASE PROJECT ALLOCATION - $260,000)
    16  (7.1) (7.2)  Port Authority of Allegheny County                   <--
    17     (i) FY 2009-2010 Federal Flex Funds (STP and/or
    18         CMAQ)                                           2,000,000
    19     (ii)  FY 2009-2010 section 5309 fixed guideway
    20         modernization                                   5,000,000
    21     (iii)  FY 2009-2010 East-West Corridor Rapid
    22         Transit                                         5,000,000
    23     (iv)  FY 2009-2010 infrastructure Safety
    24         Renewal Program (ISRP)                         17,000,000
    25     (v)  FY 2009-2010 vehicle overhaul                  4,000,000
    26     (vi)  FY 2009-2010 section 5307 Formula
    27         Program                                         7,000,000
    28  (7.2) (7.3)  Luzerne County                                       <--
    29     (i)  Acquisition, construction, infrastructure
    30         and other related costs for an intermodal
    20070H1589B2181                 - 39 -     

     1         transportation facility in City of Wilkes-
     2         Barre                                           4,000,000
     3  (8)  Red Rose Transit Authority
     4     (i)  Replace bus washer and renovation and
     5         expand bus storage building                       375,000
     6             (Base Project Allocation - $337,000)
     7             (Design and Contingencies - $38,000)
     8     (ii)  Design and construct new station on
     9         AMTRAK Harrisburg to Philadelphia line in
    10         Paradise Township, Lancaster County               200,000
    11             (Base Project Allocation - $180,000)
    12             (Design and Contingencies - $20,000)
    13  (9)  Shenango Valley Shuttle Service
    14     (i)  Construct a maintenance facility including
    15         equipment and land acquisition                    250,000
    16             (Base Project Allocation - $225,000)
    17             (Design and Contingencies - $25,000)
    18  (10)  Southeastern Pennsylvania Transportation
    19     Authority
    20     (i)  Provide for the rehabilitation of
    21         improvements at Croyden and Levittown
    22         Stations located in Bucks County with
    23         improvements to include the installation of
    24         bus shelters and transit signage, station
    25         improvements, bus access improvements at
    26         both stations and parking expansion            3,500,000
    27             (Base Project Allocation - $3,150,000)
    28             (Design and Contingencies - $350,000)
    29     (ii)  Provide for the rehabilitation of
    30         improvements to bus and rail intermodal
    20070H1589B2181                 - 40 -     

     1         connections at the Glenside and Jenkintown
     2         Stations in Montgomery County with
     3         improvements to include design and
     4         construction of a multilevel 384 space
     5         parking garage at Glenside Station and a
     6         multilevel 700 space parking garage at
     7         Jenkintown Station                              6,700,000
     8             (Base Project Allocation - $6,030,000)
     9             (Design and Contingencies - $670,000)
    10     (iii)  FFY 2008 Transit Enhancement Program,
    11         provide for renovation and preservation of
    12         historic train stations and related
    13         activities including bus shelters,
    14         landscaping, street lights, pedestrian
    15         access and walkways, bicycle access,
    16         signage and enhanced access to transit for
    17         persons with disabilities                         670,000
    18             (Base Project Allocation - $603,000)
    19             (Design and Contingencies - $67,000)
    20     (iv)  Provide for construction of a multilevel
    21         parking structure and pedestrian overpass
    22         over AMTRAK tracks, to connect the west
    23         side of the campus of Villanova to the main
    24         campus, with parking for approximately
    25         1,000 vehicles and be handicapped
    26         accessible                                        625,000
    27             (Base Project Allocation - $562,000)
    28             (Design and Contingencies - $63,000)
    29     (v)  FFY 2002 Section 5309 Transit Enhancement
    30         Program, provide additional funding for the
    20070H1589B2181                 - 41 -     

     1         acquisition of 104 new rail cars for SEPTA
     2         Regional Rail service                           2,000,000
     3             (Base Project Allocation - $1,800,000)
     4             (Design and Contingencies - $200,000)
     5  (11)  Union and Snyder Transit Authority
     6     (i)  Construct maintenance facility including
     7         equipment and land acquisition                    304,000
     8             (Base Project Allocation - $273,000)
     9             (Design and Contingencies - $31,000)
    10  (12)  Department of Transportation
    11     (i)  Provide for rail passenger improvements
    12         across this Commonwealth including matching
    13         funds for the Keystone Corridor Federal
    14         funding                                        15,000,000
    15             (Base Project Allocation - $13,500,000)
    16             (Design and Contingencies - $1,500,000)
    17     (ii)  Provide for Intercity Bus Capital
    18         Assistance Intermodal Projects and ADA
    19         related facilities/equipment improvements       2,000,000
    20             (Base Project Allocation - $1,800,000)
    21             (Design and Contingencies - $200,000)
    22     (b)  Rural and intercity rail.--Additional capital projects
    23  in the category of transportation assistance projects for rural
    24  and intercity rail service projects to be constructed or with
    25  respect to which an interest is to be acquired by the Department
    26  of Transportation, its successors or assigns and to be financed
    27  by the incurring of debt are hereby itemized, together with
    28  their respective estimated financial costs, as follows:
    29                                                           Total
    30                                                          Project
    20070H1589B2181                 - 42 -     

     1             Project                                    Allocation
     2  (1)  Allegheny Valley Railroad
     3     (i)  P&W Subdivision Phase II railroad
     4         infrastructure rehabilitation and capacity
     5         improvements, including track, roadbed,
     6         bridges and grade crossings from MP 322 to
     7         MP 326 and from MP 1 to MP 31 in Allegheny
     8         and Butler Counties                             2,860,000
     9             (Base Project Allocation - $2,600,000)
    10             (Design and Contingencies - $260,000)
    11     (ii)  W&P Subdivision Phase II railroad
    12         infrastructure rehabilitation and capacity
    13         improvements, including track, roadbed,
    14         bridges and grade crossings from MP 4 to MP
    15         39 in Allegheny and Washington Counties         2,530,000
    16             (Base Project Allocation - $2,300,000)
    17             (Design and Contingencies - $230,000)
    18     (iii)  Glenwood Yard new and rebuilt yard
    19         tracks, capacity improvements, safety
    20         improvements and rail infrastructure
    21         rehabilitation, including track, roadbed,
    22         bridges and grade crossings in Allegheny
    23         County                                          4,840,000
    24             (Base Project Allocation - $4,400,000)
    25             (Design and Contingencies - $440,000)
    26  (2)  Buffalo and Pittsburgh Railroad
    27     (i)  Rehabilitate mainline track in Armstrong,
    28         Clearfield, Indiana and Jefferson Counties,
    29         from Kittanning to Dubois and Punxsutawney
    30         to Homer City with work to include tie and
    20070H1589B2181                 - 43 -     

     1         rail replacement, surfacing, bridge repair,
     2         switch, road crossing, signal,
     3         communication and any other related work        5,000,000
     4  (3)  Centre County
     5     (i)  Construction and other costs related to
     6         the SEDA Welded Rail Project Phase IV -
     7         Sayers Dam in Liberty Howard Boggs
     8         Township                                          800,000
     9  (4)  Lawrence County
    10     (i)  Acquisition, construction, infrastructure
    11         and other related costs for reconstruction
    12         of rail lines in Ellwood Borough               10,000,000
    13  (5)  Lehigh Valley Rail Management
    14     (i)  Construct access and storage tanks and
    15         rehabilitate track within and around the
    16         Bethlehem Commerce Center                       3,500,000
    17  (6)  Luzerne County
    18     (i)  Acquisition, construction, infrastructure
    19         and other related costs for Whitney Point
    20         rail infrastructure project in Luzerne
    21         Township                                        5,000,000
    22  (7)  Northumberland County
    23     (i)  Infrastructure and other related costs to
    24         extend rail service to the SEEDCO
    25         Industrial Park in Coal Township                3,500,000
    26  (7.1)  ROSEBUD MINING RAILROAD EXPANSION                          <--
    27     (I)  EXTENSION OF ROSEBUD MINING RAILROAD LINE
    28         IN BETHEL TOWNSHIP                              5,000,000
    29             (BASE PROJECT ALLOCATION - $5,000,000)
    30  (8)  Westmoreland County
    20070H1589B2181                 - 44 -     

     1     (i)  Construction and other related costs for
     2         the Norfolk Southern Commuter Rail Project     30,000,000
     3     (ii)  Development of the Alle-Kiski Commuter
     4         Rail Project                                    3,000,000
     5  (9)  Westmoreland County Industrial Development
     6     Corporation
     7     (i)  Mount Pleasant Subdivision rail
     8         infrastructure rehabilitation and capacity
     9         improvements, including track, roadbed,
    10         bridges and grade crossings from MP 0 to MP
    11         15 in Westmoreland and Fayette Counties         2,860,000
    12             (Base Project Allocation - $2,600,000)
    13             (Design and Contingencies - $260,000)
    14     (ii)  Radebaugh Subdivision rail infrastructure
    15         rehabilitation and capacity improvements,
    16         including track, roadbed, bridges and grade
    17         crossings from MP 0 to MP 18 in
    18         Westmoreland County                             2,640,000
    19             (Base Project Allocation - $2,400,000)
    20             (Design and Contingencies - $240,000)
    21     (iii)  Development of new yard track structure
    22         and rail infrastructure rehabilitation and
    23         capacity improvements, including track,
    24         roadbed, bridges and grade crossings within
    25         Westmoreland Rail Freight Terminal in
    26         Westmoreland County                             1,540,000
    27             (Base Project Allocation - $1,400,000)
    28             (Design and Contingencies - $140,000)
    29     (c)  Air transportation.--Additional capital projects in the
    30  category of transportation assistance projects for air
    20070H1589B2181                 - 45 -     

     1  transportation service to which an interest is to be acquired by
     2  the Department of Transportation, its successors or assigns and
     3  to be financed by the incurring of debt are hereby itemized,
     4  together with their respective estimated financial costs, as
     5  follows:
     6                                                           Total
     7                                                          Project
     8             Project                                    Allocation
     9  (1)  Allegheny County
    10     (i)  Allegheny County Airport Authority
    11         (A)  Upgrade to Allegheny County Airport
    12             Terminal and surrounding runways in
    13             West Mifflin Borough                          500,000
    14  (2)  Clinton County
    15     (i)  William T Piper Memorial Airport
    16         (A)  Construction, redevelopment and other
    17             costs related to the Airport Hangar
    18             Rehabilitation and Construction Project
    19             in Lock Haven Borough                         500,000
    20  (2.1)  INDIANA COUNTY                                             <--
    21     (I)  JIMMY STEWART AIRPORT
    22         (A)  ACQUISITION, RELATED INFRASTRUCTURE
    23             AND CONSTRUCTION OF AN ACCESS ROAD AND
    24             HANGARS AT THE JIMMY STEWART AIRPORT        2,000,000
    25             (BASE PROJECT ALLOCATION - $2,000,000)
    26  (3)  Lehigh County
    27     (i)  Lehigh Valley International Airport
    28         (A)  Provide for the economic development
    29             and safety enhancement at the airport       5,000,000
    30             (Base Project Allocation - $4,500,000)
    20070H1589B2181                 - 46 -     

     1             (Design and Contingencies - $500,000)
     2  (4)  Luzerne County
     3     (i)  Hazle Township
     4         (A)  Acquisition, construction,
     5             infrastructure and other related costs
     6             for the development of a cargo airport    250,000,000
     7  (4.1)  MONROE COUNTY                                              <--
     8     (I)  POCONO MOUNTAINS MUNICIPAL AIRPORT
     9         (A)  RUNWAY EXPANSION AT THE POCONO
    10             MOUNTAINS MUNICIPAL AIRPORT                 1,000,000
    11             (BASE PROJECT ALLOCATION - $1,000,000)
    12  (5)  Washington County
    13     (i)  South Franklin Township
    14         (A)  Construction, infrastructure and other
    15             related costs for the Washington County
    16             Airport infrastructure project              1,000,000
    17         (B)  Acquisition, construction,
    18             infrastructure and other related costs
    19             for the Washington County Airport
    20             expansion                                   2,000,000
    21  Section 6.  Itemization of redevelopment assistance capital
    22                 projects.
    23  (1)  Adams County
    24     (i)  County projects (Reserved)
    25     (II)  CARROLL VALLEY BOROUGH                                   <--
    26         (A)  PLANNING, DESIGN AND CONSTRUCTION OF A
    27             NEW CARROLL VALLEY BOROUGH BUILDING           800,000
    28  (2)  Allegheny County
    29     (i)  County projects
    30         (A)  Acquisition, construction and other
    20070H1589B2181                 - 47 -     

     1             related costs for the Millvale Marina
     2             to Sharpsburg recreation project            1,000,000
     3     (ii)  City of Pittsburgh
     4         (A)  Acquisition, construction,
     5             infrastructure and other related costs
     6             for the Morningside Community Center          725,000
     7         (B)  Construction and other related costs
     8             for Pittsburgh Life Sciences expansion      1,000,000
     9         (C)  Construction, acquisition,
    10             infrastructure, redevelopment and other
    11             costs related to the revitalization at
    12             Perry South                                 1,500,000
    13         (D)  Construction, infrastructure,
    14             redevelopment and other costs related
    15             to Allegheny General Hospital
    16             renovations                                 7,000,000
    17         (E)  Construction, acquisition,
    18             redevelopment and other costs related
    19             to the Center Avenue and Thelma Lovette
    20             Family YMCA projects                        3,500,000
    21         (F)  Construction and other related costs
    22             for the renovation of the Marian Manor
    23             senior health facility                        550,000
    24         (G)  Construction, acquisition,
    25             infrastructure, redevelopment,
    26             abatement of hazardous materials and
    27             other costs related to the Strip
    28             District project                            6,000,000
    29         (H)  Construction, infrastructure,
    30             redevelopment and other costs
    20070H1589B2181                 - 48 -     

     1             associated with the Beechview
     2             redevelopment project                       3,000,000
     3         (I)  Construction, infrastructure and other
     4             related costs for Strip District
     5             improvements                                2,000,000
     6         (J)  Construction, infrastructure and other
     7             related costs for Strip District
     8             infrastructure improvements                 6,000,000
     9         (K)  Construction and other related costs
    10             to renovate Family House University
    11             Club                                        1,500,000
    12         (L)  Construction, redevelopment and other
    13             costs associated with renovation and
    14             expansion of the Robert Morris
    15             University downtown campus                  5,000,000
    16         (M)  Acquisition, construction and other
    17             related costs for UPMC St. Margaret
    18             expansion                                  15,600,000
    19         (N)  Construction, infrastructure and other
    20             related costs to restore and expand
    21             Deans Athletic Field community park           588,000
    22         (O)  Construction, acquisition,
    23             infrastructure, redevelopment,
    24             abatement of hazardous materials and
    25             other costs related to the development
    26             of Lawrenceville                           10,000,000
    27         (P)  Construction and other related costs
    28             for Riverview Towers renovations            1,800,000
    29         (Q)  Construction, infrastructure and
    30             related costs for the Grandview Scenic
    20070H1589B2181                 - 49 -     

     1             Byway project                               1,000,000
     2         (R)  Construction and other related costs
     3             for the Brookline Boulevard project         3,900,000
     4         (S)  Construction and other related costs
     5             for the Homewood Brushton Community
     6             Development Corporation Sterret-Collier
     7             corridor revitalization                     5,000,000
     8         (T)  Construction and other related costs
     9             for Route 51 corridor redevelopment and
    10             improvement                                 5,000,000
    11         (U)  Construction, infrastructure and other
    12             related costs for the National Aviary
    13             expansion                                   5,000,000
    14         (V)  Construction, infrastructure and other
    15             related costs for the Urban League of
    16             Greater Pittsburgh Charter School           1,500,000
    17         (W)  Construction and other related costs
    18             for the revitalization of Broadway
    19             Avenue                                      7,000,000
    20         (X)  Acquisition, construction,
    21             infrastructure and other related costs
    22             for the Pittsburgh Zoo and PPG
    23             Aquarium                                    5,000,000
    24         (Y)  ACQUISITION, CONSTRUCTION,                            <--
    25             INFRASTRUCTURE AND OTHER RELATED COSTS
    26             FOR THE UNIVERSITY OF PITTSBURGH
    27             DIABETES INSTITUTE                         20,000,000
    28         (Z)  ACQUISITION, CONSTRUCTION,
    29             INFRASTRUCTURE AND OTHER RELATED COSTS
    30             FOR THE PITTSBURGH ZOO AND PPG
    20070H1589B2181                 - 50 -     

     1             AQUARIUM                                      500,000
     2     (iii)  Baldwin Borough
     3         (A)  Construction and other related costs
     4             to renovate fire department building          500,000
     5     (iv)  Bethel Park
     6         (A)  Construction and other related costs
     7             for the Bethel Park Community Center
     8             expansion                                   2,500,000
     9     (v)  Borough of Wilkinsburg
    10         (A)  Construction and other related costs
    11             for the revitalization of commercial
    12             corridor including residential housing      5,000,000
    13     (vi)  Dravosburg Borough
    14         (A)  Acquisition, construction and other
    15             related costs for the Dravosburg
    16             waterfront development                        500,000
    17     (vii)  Glassport Borough
    18         (A)  Construction and other related costs
    19             for the municipal building
    20             redevelopment                                 500,000
    21         (B)  Acquisition, construction and other
    22             related costs for demolition and
    23             redevelopment of abandoned properties         500,000
    24     (viii)  Green Tree Borough
    25         (A)  Construction and other related costs
    26             for Aiken Elementary School
    27             improvements                                  500,000
    28         (B)  Construction and other related costs
    29             for the Green Tree Road improvement
    30             project                                     3,000,000
    20070H1589B2181                 - 51 -     

     1     (ix)  Town of McCandless
     2         (A)  Construction and other related costs
     3             for the UPMC Passavant Patient Tower
     4             expansion                                  20,000,000
     5     (x)  City of McKeesport
     6         (A)  Construction, abatement of hazardous
     7             materials and other costs associated
     8             with the McKeesport Fire Department
     9             building project                            1,000,000
    10         (B)  Construction, infrastructure and other
    11             costs associated with the Marshall
    12             Drive redevelopment project                   500,000
    13     (xi)  Mt. Lebanon Township
    14         (A)  Construction and other related costs
    15             for the redevelopment of Washington
    16             Road business district                      2,500,000
    17         (B)  Construction and other related costs
    18             for a transit-oriented development
    19             project                                     1,000,000
    20     (XII)  FOX CHAPEL BOROUGH AND O'HARA TOWNSHIP                  <--
    21         (A)  ACQUISITION AND CONSTRUCTION RELATED
    22             TO REDEVELOPMENT OF CCLA LAURE ANN WEST
    23             MEMORIAL LIBRARY                            1,000,000
    24  (3) Armstrong County (Reserved)                                   <--
    25  (3)  ARMSTRONG COUNTY                                             <--
    26     (I)  COUNTY PROJECTS (RESERVED)
    27     (II)  CITY OF PARKER
    28         (A)  LAND ACQUISITION, SITE DEVELOPMENT AND
    29             CONSTRUCTION TO SUPPORT THE
    30             REVITALIZATION OF DOWNTOWN PARKER             500,000
    20070H1589B2181                 - 52 -     

     1     (III)  EAST FRANKLIN TOWNSHIP
     2         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
     3             RELATED COSTS FOR ARMSTRONG COUNTY
     4             COMMONS                                    10,000,000
     5     (IV)  WEST KITTANNING BOROUGH
     6         (A)  ACQUISITION OF LAND, DEMOLITION AND
     7             CONSTRUCTION OF BOROUGH BUILDING              500,000
     8  (4)  Beaver County
     9     (i)  County projects (Reserved)
    10         (A)  Acquisition, construction,
    11             infrastructure and other related costs
    12             for a family services center                3,000,000
    13     (ii)  Center Township
    14         (A)  Acquisition, construction,
    15             infrastructure and other related costs
    16             for the Gateway Youth Services Center       3,000,000
    17     (III)  MIDLAND BOROUGH                                         <--
    18         (A)  ACQUISITION, CONSTRUCTION,
    19             INFRASTRUCTURE AND OTHER RELATED COSTS
    20             FOR THE BEAVER COUNTY INDUSTRIAL
    21             MUSEUM                                      1,500,000
    22  (5)  Bedford County (Reserved)                                    <--
    23  (5)  BEDFORD COUNTY                                               <--
    24     (I)  COUNTY PROJECTS (RESERVED)
    25     (II)  WEST PROVIDENCE TOWNSHIP
    26         (A)  ACQUISITION AND CONSTRUCTION OF
    27             EVERETT BUSINESS CENTER                     1,500,000
    28  (6)  Berks County
    29     (i)  County projects
    30         (A)  Carpenter Technology, expansion
    20070H1589B2181                 - 53 -     

     1             project, for construction,
     2             infrastructure improvements and other
     3             related costs for a manufacturing and
     4             economic development project               27,000,000
     5  (7)  Blair County (Reserved)                                      <--
     6  (7)  BLAIR COUNTY                                                 <--
     7     (I)  COUNTY PROJECTS (RESERVED)
     8     (II)  CITY OF ALTOONA
     9         (A)  ACQUISITION, CONSTRUCTION AND
    10             INFRASTRUCTURE RELATED TO THE
    11             RENOVATION OF MISHLER THEATRE               2,100,000
    12     (III)  LOGAN TOWNSHIP
    13         (A)  ACQUISITION, CONSTRUCTION,
    14             INFRASTRUCTURE AND OTHER COSTS RELATED
    15             TO THE REDEVELOPMENT OF KETTLE CREEK
    16             MIXED-USE DEVELOPMENT                       5,000,000
    17  (8)  Bradford County (Reserved)
    18  (9)  Bucks County
    19     (i)  County projects (Reserved)
    20     (II)  BENSALEM TOWNSHIP                                        <--
    21         (A)  RENOVATION OF THE MACK PARK RECREATION
    22             COMPLEX, INCLUDING CONSTRUCTION               250,000
    23     (ii) (III)  Bristol Borough                                    <--
    24         (A)  Construction, infrastructure and other
    25             related costs for parking facilities        3,000,000
    26         (B)  Construction, infrastructure and other
    27             related costs for waterfront
    28             development                                 2,000,000
    29         (C)  Acquisition, construction,
    30             infrastructure and other related costs
    20070H1589B2181                 - 54 -     

     1             for waterfront development along the
     2             Delaware River                              2,000,000
     3         (D)  Acquisition, construction,
     4             infrastructure and other related costs
     5             for Elm and Chestnut Streets
     6             redevelopment                               2,500,000
     7     (iii) (IV)  Bristol Township                                   <--
     8         (A)  Infrastructure, redevelopment and
     9             other related costs to convert the
    10             Lower Bucks Hospital to a full
    11             telemetry-based hospital                    1,000,000
    12         (B)  Infrastructure, redevelopment and
    13             other related costs for Lower Bucks
    14             Hospital security upgrades and
    15             bioterrorism training                         575,000
    16         (C)  Construction, infrastructure and other
    17             related costs to rebuild the Lower
    18             Bucks Hospital Patient Unit 4F              3,000,000
    19         (D)  Infrastructure, redevelopment and
    20             other related costs to purchase three
    21             portable orthopedic X-ray machines for
    22             Lower Bucks Hospital                          420,000
    23         (E)  Construction, infrastructure and other
    24             related costs for the renovation of the
    25             Bristol Township municipal building         8,000,000
    26         (F)  Infrastructure, redevelopment and
    27             other related costs to build a Lower
    28             Bucks Hospital vascular lab                 2,000,000
    29         (G)  Infrastructure, redevelopment and
    30             other related costs for safety and code
    20070H1589B2181                 - 55 -     

     1             upgrades for Lower Bucks Hospital           2,500,000
     2         (H)  Infrastructure, redevelopment and
     3             other related costs to purchase a 64-
     4             slice CT scanner for Lower Bucks
     5             Hospital                                    2,500,000
     6         (I)  Infrastructure, redevelopment and
     7             other related costs to purchase two
     8             digital mammography systems for Lower
     9             Bucks Hospital                                725,000
    10         (J)  Infrastructure, redevelopment and
    11             other related costs to purchase
    12             Computerized Physician Order Entry
    13             (CPOE)systems for Lower Bucks Hospital      1,500,000
    14     (V)  CHALFONT BOROUGH                                          <--
    15         (A)  ACQUISITION AND CONSTRUCTION FOR
    16             CHALFONT FIREHOUSE                            500,000
    17         (B)  ACQUISITION, CONSTRUCTION,
    18             INFRASTRUCTURE AND OTHER COSTS RELATED
    19             TO THE EXPANSION OF THE CHILDREN'S
    20             HOSPITAL OF PHILADELPHIA SPECIALTY CARE
    21             AND AMBULATORY SURGERY CENTER                 500,000
    22     (iv) (VI)  Falls Township                                      <--
    23         (A)  Construction and other related costs
    24             for the Falls Township Senior Citizen
    25             Center                                      1,000,000
    26         (B)  Acquisition, construction,
    27             infrastructure and other related costs
    28             for the YMCA Community Center at Snipes
    29             Farm                                        4,000,000
    30     (v) (VII)  Hamburg Borough                                     <--
    20070H1589B2181                 - 56 -     

     1         (A)  Construction and related
     2             infrastructure for the Hamburg Area
     3             High School Stadium Project                   500,000
     4     (VIII)  HILLTOWN TOWNSHIP                                      <--
     5         (A)  CONSTRUCTION AND RESTORATION OF PEARL
     6             S. BUCK HOUSE                               1,000,000
     7     (IX)  LANGHORNE BOROUGH
     8         (A)  EXPANSION AND RENOVATION OF ST. MARY'S
     9             HOSPITAL, INCLUDING CONSTRUCTION            1,000,000
    10     (vi) (X)  Middletown Township                                  <--
    11         (A)  Construction and other related costs
    12             for the Middletown Community Center         1,500,000
    13     (XI)  NOCKAMIXON TOWNSHIP                                      <--
    14         (A)  RENOVATION OF CENTRAL BUCKS SENIOR
    15             CENTER, INCLUDING CONSTRUCTION AND
    16             RELATED INFRASTRUCTURE                         60,000
    17     (XII)  SELLERSVILLE BOROUGH
    18         (A)  CONSTRUCTION OF THE RECOVERY CENTER AT
    19             PENN FOUNDATION, INCLUDING RELATED
    20             INFRASTRUCTURE COSTS                        1,000,000
    21     (XIII)  WARRINGTON TOWNSHIP
    22         (A)  CONSTRUCTION OF WEST END FIRE STATION,
    23             INCLUDING RELATED INFRASTRUCTURE              500,000
    24  (10)  Butler County (Reserved)                                    <--
    25  (10)  BUTLER COUNTY                                               <--
    26     (I)  COUNTY PROJECTS
    27         (A)  ACQUISITION, CONSTRUCTION,
    28             INFRASTRUCTURE AND OTHER RELATED COSTS
    29             FOR A NEW INPATIENT FACILITY AT BUTLER
    30             MEMORIAL HOSPITAL                          20,000,000
    20070H1589B2181                 - 57 -     

     1     (II)  CITY OF BUTLER
     2         (A)  CONSTRUCTION AND RELATED COSTS FOR
     3             REDEVELOPMENT OF DOWNTOWN DISTRICT,
     4             INCLUDING RELATED INFRASTRUCTURE            6,000,000
     5         (B)  ACQUISITION AND DEVELOPMENT OF FORMER
     6             PULLMAN STANDARD OFFICE BUILDING FOR
     7             USE AS A MULTI-TENANT FACILITY              3,000,000
     8     (III)  BUFFALO TOWNSHIP
     9         (A)  ACQUISITION, CONSTRUCTION AND RELATED
    10             INFRASTRUCTURE FOR BUSINESS AND
    11             TECHNOLOGY PARK                             1,500,000
    12     (IV)  BUTLER TOWNSHIP
    13         (A)  CONSTRUCTION OF BUTLER CROSSING
    14             PROJECT, INCLUDING RELATED
    15             INFRASTRUCTURE                              6,000,000
    16     (V)  FORWARD TOWNSHIP
    17         (A)  ACQUISITION AND CONSTRUCTION OF
    18             BUSINESS PARK, INCLUDING RELATED
    19             INFRASTRUCTURE                              1,000,000
    20  (11)  Cambria County
    21     (i)  County projects (Reserved)
    22     (ii)  City of Johnstown
    23         (A)  Acquisition, construction,
    24             infrastructure and other related costs
    25             for brownfield redevelopment including
    26             Festival Park                               5,000,000
    27         (B)  Acquisition, construction,
    28             infrastructure and other related costs
    29             for downtown housing redevelopment          5,000,000
    30         (C)  Acquisition, construction,
    20070H1589B2181                 - 58 -     

     1             infrastructure and other related costs
     2             for Greater Johnstown YMCA
     3             redevelopment including a community
     4             center                                      5,000,000
     5     (iii)  Richland Township
     6         (A)  Acquisition, construction,
     7             infrastructure and other related costs
     8             for the East Hills redevelopment
     9             including a recreation center               7,000,000
    10  (12)  Cameron County (Reserved)
    11  (13)  Carbon County
    12     (i)  County projects (Reserved)
    13     (ii)  Palmerton Borough
    14         (A)  Construction, infrastructure and other
    15             related costs for the regional Wall
    16             Street West Initiative                     25,000,000
    17     (iii)  Weatherly Borough
    18         (A)  Acquisition, construction,
    19             infrastructure and other related costs
    20             for the railroad/steel revitalization
    21             project                                     1,500,000
    22  (14)  Centre County
    23     (i)  County projects
    24         (A)  Construction, infrastructure and other
    25             related costs for the expansion of CPI
    26             Workforce Development                       1,000,000
    27         (B)  Construction, infrastructure and other
    28             related costs for a new biofuels plant     25,000,000
    29         (C)  Construction, infrastructure and other
    30             related costs for the Phillipsburg
    20070H1589B2181                 - 59 -     

     1             Borough Hall                                2,000,000
     2         (D)  Acquisition, construction and other
     3             related costs for the Hope and Reliance
     4             United Firefighter Center                   1,000,000
     5         (E)  Acquisition, construction,
     6             infrastructure and other related costs
     7             for the Centre County Recreation
     8             Center                                     20,000,000
     9         (F)  Construction, infrastructure and other
    10             related costs for the Moshannon Valley
    11             Economic Partnership Industrial Park        1,000,000
    12     (II)  CENTRE HALL BOROUGH                                      <--
    13         (A)  ACQUISITION, CONSTRUCTION,
    14             INFRASTRUCTURE AND OTHER RELATED COSTS
    15             FOR THE GRANGE FAIR MULTIPURPOSE
    16             COMPLEX                                       750,000
    17     (ii) (III)  State College Borough                              <--
    18         (A)  Acquisition, construction,
    19             infrastructure and other related costs
    20             for a downtown redevelopment project       12,000,000
    21  (15)  Chester County (Reserved)                                   <--
    22  (15)  CHESTER COUNTY                                              <--
    23     (I)  COUNTY PROJECTS
    24         (A)  CONSTRUCTION, ACQUISITION AND RELATED
    25             INFRASTRUCTURE FOR THE SOUTHEASTERN
    26             CHESTER COUNTY REFUSE AUTHORITY               550,000
    27     (II)  DOWNINGTOWN BOROUGH
    28         (A)  ACQUISITION, CONSTRUCTION,
    29             INFRASTRUCTURE AND OTHER RELATED COSTS
    30             FOR RIVER STATION DOWNINGTOWN
    20070H1589B2181                 - 60 -     

     1             REDEVELOPMENT                               9,500,000
     2     (III)  SCHUYLKILL TOWNSHIP
     3         (A)  EXPANSION OF THE PHOENIXVILLE YMCA,
     4             INCLUDING CONSTRUCTION                      3,000,000
     5  (16)  Clarion County (Reserved)                                   <--
     6  (16)  CLARION COUNTY                                              <--
     7     (I)  COUNTY PROJECTS (RESERVED)
     8     (II)  FOXBURG BOROUGH
     9         (A)  SITE DEVELOPMENT AND CONSTRUCTION OF
    10             MUNICIPAL CENTER BUILDING TO SUPPORT
    11             DOWNTOWN REVITALIZATION                     3,000,000
    12     (III)  CLARION TOWNSHIP
    13         (A)  SITE DEVELOPMENT AND CONSTRUCTION OF
    14             CLARION COUNTY YMCA FACILITY, INCLUDING
    15             LAND ACQUISITION AND RELATED
    16             INFRASTRUCTURE                              3,500,000
    17  (17)  Clearfield County
    18     (i)  County projects
    19         (A)  Construction and other related costs
    20             for the Wood Pellet Mill project            1,000,000
    21         (B)  Construction and other costs
    22             associated with the Biomass Conversion
    23             Center of Excellence                        2,750,000
    24         (C)  Construction, infrastructure and other
    25             costs related to coal gasification
    26             project                                    20,000,000
    27     (ii)  Clearfield Borough
    28         (A)  Acquisition, construction,
    29             infrastructure and other related costs
    30             for riverfront development                  6,000,000
    20070H1589B2181                 - 61 -     

     1         (B)  CONSTRUCTION, INFRASTRUCTURE AND OTHER                <--
     2             RELATED COSTS FOR A RIVERWALK, PARK
     3             REVITALIZATION AND FISH LADDER ALONG
     4             THE SUSQUEHANNA RIVER                       2,500,000
     5         (C)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
     6             RELATED COSTS FOR BUSINESS DISTRICT
     7             PARKING FACILITIES                          5,000,000
     8     (iii)  Curwensville Borough
     9         (A)  Infrastructure and other costs related
    10             to building the Sunnyside Ethanol
    11             Manufacturing Plant                         5,000,000
    12     (iv)  Karthaus KARTHOUS Township                               <--
    13         (A)  Construction, infrastructure and other
    14             costs associated with the River Hill
    15             Power Waste Coal Fired Power Plant         15,000,000
    16     (v)  Lawrence Township
    17         (A)  Construction and other related costs
    18             for a BioEnergy Ethanol Plant               5,000,000
    19  (18)  Clinton County
    20     (i)  County projects
    21         (A)  Acquisition, construction and other
    22             related costs for the Beech Creek
    23             Watershed project                           5,000,000
    24         (B)  Construction and other related costs
    25             for the Annie Halenbake Ross Library
    26             and Renovo Library                          1,000,000
    27         (C)  Acquisition, construction,
    28             infrastructure and other related costs
    29             for the Susquehanna River Corridor          2,000,000
    30     (ii)  City of Lock Haven
    20070H1589B2181                 - 62 -     

     1         (A)  Construction, infrastructure and other
     2             costs associated with the Downtown
     3             Streetscape improvement project             1,250,000
     4         (B)  Construction and other related costs
     5             for the First Quality Products
     6             Manufacturing Facility                      1,000,000
     7     (iii)  Mill Hall Borough
     8         (A)  Acquisition, construction and other
     9             related costs for Millbrook Playhouse       1,000,000
    10     (iv)  Wayne Township
    11         (A)  Construction and other related costs
    12             for Zindel Park development and
    13             improvements                                  500,000
    14  (19)  Columbia County (Reserved)
    15  (20)  Crawford County (Reserved)                                  <--
    16  (20)  CRAWFORD COUNTY                                             <--
    17     (I)  COUNTY PROJECTS (RESERVED)
    18     (II)  VERNON TOWNSHIP
    19         (A)  ACQUISITION, CONSTRUCTION,
    20             INFRASTRUCTURE AND OTHER RELATED COSTS
    21             FOR THE CRAWFORD COUNTY INDUSTRIAL PARK
    22             EAST                                        2,000,000
    23  (21)  Cumberland County (Reserved)                                <--
    24  (21)  CUMBERLAND COUNTY                                           <--
    25     (I)  COUNTY PROJECTS (RESERVED)
    26     (II)  SHIPPENSBURG TOWNSHIP
    27         (A)  INFRASTRUCTURE IMPROVEMENTS AND
    28             CONSTRUCTION OF SHIPPENSBURG REGIONAL
    29             CONFERENCE CENTER                           3,000,000
    30     (III)  SILVER SPRING TOWNSHIP
    20070H1589B2181                 - 63 -     

     1         (A)  CONSTRUCTION, SITE PREPARATION AND
     2             OTHER RELATED COSTS FOR A MIXED-USE
     3             DEVELOPMENT                                 5,000,000
     4     (IV)  UPPER ALLEN TOWNSHIP
     5         (A)  CONSTRUCTION OF RIDER-MUSSER MIXED-USE
     6             DEVELOPMENT OPERATED BY MESSIAH
     7             COLLEGE, INCLUDING RELATED
     8             INFRASTRUCTURE                              7,500,000
     9         (B)  CONSTRUCTION OF A REGIONAL CONFERENCE
    10             CENTER AT MESSIAH COLLEGE, INCLUDING
    11             RELATED INFRASTRUCTURE                      6,000,000
    12  (22)  Dauphin County
    13     (i)  County projects (Reserved)
    14     (ii)  City of Harrisburg
    15         (A)  Construction and other related costs
    16             for the Pinnacle Health Hospital
    17             Emergency Department                        5,000,000
    18         (B)  Construction, infrastructure and other
    19             related costs for renovation of the
    20             Whitaker Center for Science and the
    21             Arts                                        1,500,000
    22     (III)  DERRY TOWNSHIP                                          <--
    23         (A)  ACQUISITION, CONSTRUCTION,
    24             INFRASTRUCTURE AND OTHER RELATED COSTS
    25             FOR THE HERSHEY AREA MASTER PLAN           25,000,000
    26     (IV)  LOWER PAXTON TOWNSHIP
    27         (A)  CONSTRUCTION OF HEROES GROVE,
    28             INCLUDING RELATED INFRASTRUCTURE            1,000,000
    29         (B)  CONSTRUCTION AND DEVELOPMENT OF THE
    30             THOMAS B. GEORGE PARK                       1,000,000
    20070H1589B2181                 - 64 -     

     1     (V)  SWATARA TOWNSHIP
     2         (A)  CONSTRUCTION AND INFRASTRUCTURE
     3             RELATED TO THE DEVELOPMENT OF SWATARA
     4             COMMONS                                    10,000,000
     5  (23)  Delaware County
     6     (i)  County projects
     7         (A)  Acquisition and other related costs to
     8             Tri Borough Fire Company Consolidation        500,000
     9     (ii)  City of Chester
    10         (A)  Acquisition, construction,
    11             infrastructure and other related costs
    12             for the downtown revitalization             5,000,000
    13     (III)  CLIFTON HEIGHTS                                         <--
    14         (A)  ACQUISITION AND CONSTRUCTION OF
    15             MUNICIPAL SERVICE BUILDING AND PROPERTY
    16             ENHANCEMENTS                                3,000,000
    17     (IV)  EDGEMONT TOWNSHIP
    18         (A)  CONSTRUCTION OF A MULTIPURPOSE,
    19             PROFESSIONAL INDOOR EQUESTRIAN ARENA          500,000
    20     (V)  GLENOLDEN BOROUGH
    21         (A)  REDEVELOPMENT AND CONSTRUCTION RELATED
    22             TO THE REVITALIZATION OF VARIOUS
    23             BOROUGH BUILDINGS                             500,000
    24     (iii) (VI)  Haverford Township                                 <--
    25         (A)  Construction and other related costs
    26             for the Haverford Township Community
    27             Center                                      8,000,000
    28     (VII)  NORWOOD BOROUGH                                         <--
    29         (A)  CONSTRUCTION OF FIREHOUSE AND POLICE
    30             STATION, INCLUDING FACILITY DEMOLITION
    20070H1589B2181                 - 65 -     

     1             AND SITE PREPARATION                        3,000,000
     2     (VIII)  RADNOR TOWNSHIP
     3         (A)  CONSTRUCTION, INFRASTRUCTURE AND
     4             RELATED COSTS TO RENOVATE WOODCREST
     5             MANSION                                     5,000,000
     6     (IX)  RIDLEY PARK BOROUGH
     7         (A)  REDEVELOPMENT AND CONSTRUCTION RELATED
     8             TO THE REVITALIZATION OF VARIOUS
     9             BOROUGH BUILDINGS                           1,000,000
    10         (B)  INFRASTRUCTURE IMPROVEMENTS AND
    11             CONSTRUCTION TO TAYLOR HOSPITAL             2,000,000
    12     (iv) (X)  Ridley Township                                      <--
    13         (A)  Construction of new township community
    14             center                                      1,000,000
    15         (B)  Construction, infrastructure and other
    16             related costs for the Ridley Township
    17             Community Center                            2,000,000
    18     (v) (XI)  Swarthmore Borough                                   <--
    19         (A)  Construction, acquisition,
    20             infrastructure and other costs related
    21             to the Swarthmore Town Center
    22             Development                                 2,000,000
    23     (XII)  UPPER DARBY TOWNSHIP                                    <--
    24         (A)  CONSTRUCTION OF PUBLIC SAFETY
    25             BUILDING, INCLUDING LAND ACQUISITION
    26             AND RELATED COSTS                           7,000,000
    27         (B)  CONSTRUCTION AND ABATEMENT OF
    28             HAZARDOUS MATERIALS RELATED TO
    29             DEMOLITION OF 501 BYWOOD                    2,500,000
    30         (C)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    20070H1589B2181                 - 66 -     

     1             COSTS RELATED TO REHABILITATION OF ST.
     2             CHARLES CEMETERY                            1,000,000
     3  (24)  Elk County (Reserved)
     4  (25)  Erie County
     5     (i)  County projects (Reserved)
     6     (ii)  City of Erie
     7         (A)  Acquisition, construction,
     8             infrastructure and other related costs
     9             for Downtown Erie revitalization           15,000,000
    10  (26)  Fayette County
    11     (i)  County projects (Reserved)
    12     (ii)  City of Uniontown
    13         (A)  Construction and other costs related
    14             to the expansion and renovation of
    15             Uniontown Hospital                         10,000,000
    16     (iii)  Brownsville Borough
    17         (A)  Acquisition, construction,
    18             infrastructure and other related costs
    19             for the downtown revitalization             2,000,000
    20     (iv)  Perry Township
    21         (A)  Construction of new township municipal
    22             building                                    1,000,000
    23  (27)  Forest County (Reserved)
    24  (28)  Franklin County (Reserved)
    25  (29)  Fulton County (Reserved)
    26  (30)  Green County
    27     (i)  County projects (Reserved)
    28     (ii)  Cumberland Township
    29         (A)  Construction, infrastructure,
    30             redevelopment and other costs
    20070H1589B2181                 - 67 -     

     1             associated with the Carmichaels Clinic
     2             Expansion                                     500,000
     3     (iii)  Franklin Township
     4         (A)  Acquisition, construction and related
     5             site preparation for the Cornerstone
     6             Health Care Center                            750,000
     7         (B)  Construction and other related costs
     8             for the Community Aquatic Center            1,000,000
     9         (C)  Construction and other related costs
    10             for the expansions of the addition of
    11             Southwest Regional Medical Center           1,500,000
    12     (iv)  Perry Township
    13         (A)  Construction, infrastructure and other
    14             related costs for the Meadow Ridge
    15             Business Park                               3,000,000
    16     (v)  Waynesburg Borough
    17         (A)  Construction, acquisition,
    18             infrastructure, redevelopment and other
    19             costs associated with Downtown
    20             Waynesburg Streetscape improvements         1,000,000
    21         (B)  Acquisition, construction,
    22             infrastructure and other related costs
    23             for the Greene County ARC Project           1,000,000
    24         (C)  Acquisition, construction,
    25             infrastructure and other related costs
    26             for Waynesburg redevelopment project        2,000,000
    27  (31)  Huntingdon County (Reserved)
    28  (32)  Indiana County (Reserved)                                   <--
    29  (32)  INDIANA COUNTY                                              <--
    30     (I)  COUNTY PROJECTS
    20070H1589B2181                 - 68 -     

     1         (A)  RENOVATION OF HISTORICAL COVERED
     2             BRIDGES, INCLUDING ACQUISITION,
     3             CONSTRUCTION AND OTHER RELATED COSTS        1,000,000
     4     (II)  BURRELL TOWNSHIP
     5         (A)  LAND ACQUISITION, SITE PREPARATION AND
     6             CONSTRUCTION RELATED TO DEVELOPMENT OF
     7             AMBULATORY CARE CENTER AT INDIANA
     8             REGIONAL MEDICAL CENTER                     5,000,000
     9         (B)  EXPANSION OF THE INTERCHANGE CENTER
    10             MULTITENANT BUILDING, INCLUDING
    11             CONSTRUCTION, LAND ACQUISITION AND
    12             OTHER RELATED COSTS                         2,000,000
    13         (C)  REDEVELOPMENT OF CORPORATE CAMPUS
    14             BUSINESS PARK, INCLUDING ACQUISITION,
    15             CONSTRUCTION, INFRASTRUCTURE AND OTHER
    16             RELATED COSTS                               3,000,000
    17     (III)  INDIANA BOROUGH
    18         (A)  REDEVELOPMENT, CONSTRUCTION, AND
    19             INFRASTRUCTURE IMPROVEMENTS ALONG
    20             PHILADELPHIA STREET AND 7TH STREET          5,000,000
    21     (IV)  WHITE TOWNSHIP
    22         (A)  EXPANSION OF THE INDIANA REGIONAL
    23             MEDICAL CENTER, INCLUDING CONSTRUCTION
    24             AND RELATED INFRASTRUCTURE                  1,000,000
    25         (B)  CONSTRUCTION OF AN AGRICULTURAL
    26             MULTITENANT BUILDING, INCLUDING LAND
    27             ACQUISITION, SITE PREPARATION AND OTHER
    28             RELATED COSTS                               3,000,000
    29         (C)  REDEVELOPMENT, CONSTRUCTION AND
    30             INFRASTRUCTURE IMPROVEMENTS ALONG WAYNE
    20070H1589B2181                 - 69 -     

     1             AVENUE AND 13TH STREET                      4,000,000
     2         (D)  RENOVATION OF THE MACK PARK RECREATION
     3             COMPLEX, INCLUDING CONSTRUCTION,
     4             INFRASTRUCTURE AND OTHER RELATED COSTS      3,000,000
     5         (E)  ACQUISITION, CONSTRUCTION AND RELATED
     6             INFRASTRUCTURE FOR THE DEVELOPMENT OF
     7             THE WINDY RIDGE BUSINESS PARK               4,000,000
     8         (F)  CONSTRUCTION OF A MEDICAL-MODEL
     9             WELLNESS CENTER AT INDIANA REGIONAL
    10             MEDICAL CENTER, INCLUDING ACQUISITION,
    11             INFRASTRUCTURE AND OTHER RELATED COSTS      2,000,000
    12  (33)  Jefferson County (Reserved)
    13  (34)  Juniata County (Reserved)
    14  (35)  Lackawanna County
    15     (i)  County projects (Reserved)
    16     (ii)  Dunmore Borough
    17         (A)  Construction and other costs related
    18             to building the Dunmore Fire Station        1,400,000
    19         (B)  Construction, infrastructure,
    20             redevelopment and other costs related
    21             to building the Dunmore High School
    22             Health and Fitness Center                   1,000,000
    23     (iii)  City of Scranton
    24         (A)  Acquisition and other costs related to
    25             providing the Vocational Services
    26             Community Employment Program and
    27             Sheltered Workshop                          1,000,000
    28         (B)  Construction, infrastructure,
    29             redevelopment and other costs related
    30             to the West Scranton Revitalization
    20070H1589B2181                 - 70 -     

     1             Project                                     3,000,000
     2         (C)  Construction, redevelopment and other
     3             costs related to the Ney Aug Zoo
     4             renovation and addition                    10,000,000
     5     (iv)  South Abington Township
     6         (A)  Acquisition, redevelopment and costs
     7             associated with building the South
     8             Abington Township Community Center          1,200,000
     9     (v)  Throop Borough
    10         (A)  Construction, redevelopment and other
    11             costs related to renovation of Throop
    12             Hose Company No. 3                          1,000,000
    13         (B)  Construction, acquisition and other
    14             costs related to building Throop Hose
    15             Company No. 2                               1,260,000
    16  (36)  Lancaster County
    17     (i)  County projects (Reserved)
    18     (ii)  City of Lancaster
    19         (A)  Construction and other related costs
    20             for the Thaddeus Stevens Technology
    21             Center                                      4,000,000
    22         (B)  Infrastructure and other costs
    23             associated with Lancaster wireless
    24             access                                      1,000,000
    25     (III)  COLUMBIA BOROUGH                                        <--
    26         (A)  ACQUISITION AND RENOVATION OF CENTER
    27             FOR BRAIN INJURED CHILDREN AT THE
    28             LAZARUS FOUNDATION                            913,000
    29     (IV)  EPHRATA BOROUGH
    30         (A)  REDEVELOPMENT OF MOUNTAIN SPRINGS
    20070H1589B2181                 - 71 -     

     1             HOTEL PROPERTY, INCLUDING RELATED
     2             INFRASTRUCTURE                                500,000
     3     (V)  NEW HOLLAND BOROUGH
     4         (A)  REDEVELOPMENT OF HISTORIC BUILDING ON
     5             MAIN STREET, INCLUDING RELATED
     6             INFRASTRUCTURE                                500,000
     7  (37)  Lawrence County
     8     (i)  County projects
     9         (A)  Construction, acquisition,
    10             infrastructure, redevelopment and other
    11             costs related to the Lawrence County
    12             South Central Route 18 Development
    13             District                                   12,000,000
    14         (B)  Construction, acquisition,
    15             infrastructure, redevelopment and other
    16             costs related to the Central Lawrence
    17             County Route 422 Corridor Development
    18             Area                                        8,000,000
    19     (ii)  Elwood City Borough
    20         (A)  Acquisition, construction,
    21             infrastructure and other related costs
    22             for the Ellwood Borough East Commerce
    23             Park                                       10,000,000
    24     (III)  NEW WILMINGTON BOROUGH                                  <--
    25         (A)  ACQUISITION, CONSTRUCTION,
    26             INFRASTRUCTURE AND OTHER COSTS RELATED
    27             TO THE REHABILITATION OF DOWNTOWN NEW
    28             WILMINGTON                                  1,500,000
    29  (38)  Lebanon County
    30     (i)  County projects (Reserved)
    20070H1589B2181                 - 72 -     

     1     (ii)  City of Lebanon
     2         (A)  Acquisition, construction,
     3             infrastructure and other related costs
     4             for downtown urban corridor
     5             revitalization                             10,000,000
     6     (III)  SOUTH LEBANON TOWNSHIP                                  <--
     7         (A)  REDEVELOPMENT OF POLICE DEPARTMENT
     8             FACILITIES, INCLUDING CONSTRUCTION AND
     9             RELATED INFRASTRUCTURE                        565,000
    10  (39)  Lehigh County
    11     (i)  County projects (Reserved)
    12     (ii)  City of Allentown
    13         (A)  Construction, redevelopment and other
    14             costs associated with expansion and
    15             renovation of Lehigh Valley Hospital        1,000,000
    16         (B)  Acquisition, redevelopment,
    17             streetscape improvement and other costs
    18             related to the 7th Street Property
    19             Acquisition and Beautification Project      3,000,000
    20         (C)  Acquisition, redevelopment and other
    21             costs related to the Americus Design
    22             Center                                      5,000,000
    23         (D)  Acquisition, redevelopment and other
    24             costs associated with building the
    25             Allentown Conference/Convention Center      5,000,000
    26         (E)  Acquisition, park land reclamation and
    27             other costs related to the St. Elmo
    28             Park Development                            3,000,000
    29         (F)  Acquisition, redevelopment and other
    30             costs associated with the Performing
    20070H1589B2181                 - 73 -     

     1             and Visual Arts Center                      7,000,000
     2     (iii)  City of Bethlehem
     3         (A)  Construction and other related costs
     4             for the renovation and expansion of the
     5             Lehigh Valley Hospital-Muhlenberg           5,000,000
     6     (IV)  EMMAUS BOROUGH                                           <--
     7         (A)  CONSTRUCTION AND ACQUISITION OF EMMAUS
     8             MAIN STREET PARKING DECK                    5,000,000
     9         (B)  CONSTRUCTION AND ACQUISITION OF EMMAUS
    10             MAIN STREET COMMUNITY CENTER                3,000,000
    11     (V)  LOWER MACUNGIE TOWNSHIP
    12         (A)  ACQUISITION, CONSTRUCTION,
    13             INFRASTRUCTURE AND OTHER RELATED COSTS
    14             FOR A NEW LOWER MACUNGIE FIRE
    15             DEPARTMENT FIRE STATION                     2,000,000
    16     (VI)  SALISBURY TOWNSHIP
    17         (A)  ACQUISITION, CONSTRUCTION,
    18             INFRASTRUCTURE AND OTHER RELATED COSTS
    19             FOR THE EMERGENCY DEPARTMENT AND
    20             IMAGING DEPARTMENT EXPANSION AT LEHIGH
    21             VALLEY HOSPITAL AND HEALTH NETWORK          5,300,000
    22     (VII)  UPPER SAUCON TOWNSHIP
    23         (A)  CONSTRUCTION, INFRASTRUCTURE AND
    24             RELATED COSTS FOR THE GAMBET CENTER FOR
    25             INNOVATION AND GLOBAL COMPETITIVENESS       4,000,000
    26  (40)  Luzerne County
    27     (i)  County projects (Reserved)
    28     (ii)  Ashley Borough
    29         (A)  Construction, infrastructure and other
    30             related costs for the Ashley Lane
    20070H1589B2181                 - 74 -     

     1             Project                                       500,000
     2         (B)  Acquisition, construction and other
     3             related costs for the Mill Street Mill
     4             Project                                       500,000
     5     (iii)  City of Nanticoke
     6         (A)  Acquisition, construction,
     7             infrastructure and other related costs
     8             for mixed-use development on East Main
     9             Street                                      1,000,000
    10         (B)  Construction, infrastructure and other
    11             related costs for the Luzerne County
    12             Community College Public Safety
    13             Institute                                   1,000,000
    14         (C)  Construction and other related costs
    15             for downtown parking expansion              2,000,000
    16         (D)  Acquisition, construction,
    17             infrastructure and other related costs
    18             for Luzerne County Community College
    19             student housing                             2,000,000
    20         (E)  Construction, infrastructure,
    21             redevelopment and other costs related
    22             to new housing at Susquehanna Coal
    23             Building                                      500,000
    24         (F)  Acquisition, construction and other
    25             related costs for the Lower Broadway
    26             Park multi-use project                      1,000,000
    27         (G)  Acquisition, construction,
    28             infrastructure and other related costs
    29             for the Luzerne County Community
    30             College Culinary Arts Building with
    20070H1589B2181                 - 75 -     

     1             parking                                     3,000,000
     2     (iv)  City of Wilkes-Barre
     3         (A)  Acquisition, construction,
     4             infrastructure and other related costs
     5             for the revitalization of the 100 block
     6             of South Main Street                       13,000,000
     7         (B)  Construction, infrastructure and other
     8             related costs for the renovation of the
     9             public square                               1,500,000
    10         (C)  Construction, infrastructure and other
    11             related costs for the redevelopment of
    12             the Kirby Park recreation area                750,000
    13         (D)  Construction, infrastructure,
    14             redevelopment, abatement of hazardous
    15             materials and other costs related to
    16             building the Irem Temple Mosque            10,000,000
    17         (E)  Construction, infrastructure,
    18             abatement of hazardous materials and
    19             other costs related to Impact Wilkes-
    20             Barre                                       5,000,000
    21         (F)  Construction, infrastructure,
    22             acquisition, abatement of hazardous
    23             materials, redevelopment and other
    24             costs related to Impact Wilkes-Barre        3,000,000
    25         (G)  Construction, infrastructure,
    26             acquisition, abatement of hazardous
    27             materials, redevelopment and other
    28             costs relates to Downtown Wilkes-Barre
    29             Revitalization Phase II                    15,000,000
    30         (H)  Construction, acquisition,
    20070H1589B2181                 - 76 -     

     1             infrastructure, redevelopment,
     2             abatement of hazardous materials and
     3             other costs related to Hanover
     4             Industrial Estates                          1,000,000
     5         (I)  Acquisition, construction,
     6             infrastructure and other related costs
     7             for a mixed-use facility at the Murray
     8             Complex                                    10,000,000
     9         (J)  Construction, infrastructure and other
    10             related costs for the Coal Street Park
    11             Office Complex                              7,000,000
    12         (K)  Acquisition, construction,
    13             infrastructure and other related costs
    14             for an intermodal transportation
    15             facility                                    4,000,000
    16         (L)  Construction, infrastructure and other
    17             related costs for the Coal Street Park
    18             Regional Sports Complex                     8,000,000
    19         (M)  Construction and other related costs
    20             for the redevelopment of the Murray
    21             Courtwright Complex                         5,000,000
    22         (N)  Construction, acquisition,
    23             infrastructure, redevelopment,
    24             abatement of hazardous materials and
    25             other associated with the West Market
    26             Street Mixed-Use Revitalization
    27             Project                                     5,000,000
    28     (IV.1)  DALLAS BOROUGH                                         <--
    29         (A)  ACQUISITION, CONSTRUCTION,
    30             INFRASTRUCTURE AND OTHER COSTS RELATED
    20070H1589B2181                 - 77 -     

     1             TO THE EXPANSION OF BACK MOUNTAIN
     2             CULTURAL ARTS CENTER                          500,000
     3     (v)  Hanover Township
     4         (A)  Construction, acquisition,
     5             infrastructure, redevelopment and other
     6             costs related to Hanover Crossings
     7             Phase III and IV                            4,000,000
     8         (B)  Acquisition, construction,
     9             infrastructure and other related costs
    10             for Hanover Crossings Phase III and IV      4,000,000
    11     (vi)  Hazle Township
    12         (A)  Acquisition, construction,
    13             infrastructure and other related costs
    14             for the development of a cargo airport    250,000,000
    15     (vii)  Kingston Borough
    16         (A)  Construction and other related costs
    17             for the Hoyt Library Construction
    18             Project                                     1,500,000
    19     (viii)  Wilkes-Barre Township
    20         (A)  Construction and other related costs
    21             for the renovation of the township
    22             municipal building                            500,000
    23         (B)  Construction and other related costs
    24             for the township police building              800,000
    25     (ix)  Wright Township
    26         (A)  Construction, infrastructure,
    27             abatement of hazardous materials,
    28             redevelopment and other costs related
    29             to Crestwood Industrial Park                2,500,000
    30         (B)  Acquisition, construction,
    20070H1589B2181                 - 78 -     

     1             infrastructure and other related costs
     2             for Crestwood Industrial Park               1,500,000
     3  (41)  Lycoming County (Reserved)                                  <--
     4  (41)  LYCOMING COUNTY                                             <--
     5     (I)  COUNTY PROJECTS
     6         (A)  ACQUISITION, CONSTRUCTION,
     7             INFRASTRUCTURE AND OTHER RELATED COSTS
     8             FOR THE WILLIAMSPORT CROSSCUTTER'S
     9             STADIUM PROJECT                            15,000,000
    10     (II)  CITY OF WILLIAMSPORT
    11         (A)  REDEVELOPMENT AND EXPANSION OF
    12             SUSQUEHANNA HEALTH HOSPITAL, INCLUDING
    13             ACQUISITION                                10,000,000
    14         (B)  ACQUISITION, CONSTRUCTION,
    15             INFRASTRUCTURE AND OTHER RELATED COSTS
    16             FOR THE REVITALIZATION OF TEXTROM
    17             LYCOMING FACILITIES                        10,000,000
    18         (C)  DESIGN AND CONSTRUCTION OF A NEW
    19             INTERMODAL FACILITY, INCLUDING RELATED
    20             INFRASTRUCTURE FOR THE CHURCH STREET
    21             TRANSPORTATION CENTER                       4,000,000
    22     (III)  CLINTON TOWNSHIP
    23         (A)  ACQUISITION, CONSTRUCTION,
    24             INFRASTRUCTURE AND OTHER RELATED COSTS
    25             FOR THE WHITE DEER RECREATION COMPLEX       1,000,000
    26     (IV)  JERSEY SHORE BOROUGH
    27         (A)  REDEVELOPMENT OF THE JERSEY SHORE
    28             YMCA, INCLUDING CONSTRUCTION AND
    29             RELATED INFRASTRUCTURE                      1,500,000
    30     (V)  MUNCY TOWNSHIP
    20070H1589B2181                 - 79 -     

     1         (A)  INFRASTRUCTURE WITHIN PHASE IV OF THE
     2             MUNCY INDUSTRIAL PARK                       1,000,000
     3         (B)  ACQUISITION, CONSTRUCTION,
     4             INFRASTRUCTURE AND OTHER RELATED COSTS
     5             FOR THE EASTERN LYCOMING COUNTY SENIOR
     6             CENTER                                        500,000
     7         (C)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
     8             RELATED COSTS FOR THE HALLS STATION
     9             WATER PHASE I PLUS                          4,000,000
    10  (42)  McKean County (Reserved)
    11  (43)  Mercer County
    12     (i)  County projects (Reserved)
    13     (ii)  City of Sharon
    14         (A)  Acquisition, construction,
    15             infrastructure and other related costs
    16             for downtown Sharon revitalization          3,000,000
    17     (iii)  City of Hermitage
    18         (A)  Construction, infrastructure and other
    19             costs associated with the Buhl Park
    20             Community Center renovation                 1,500,000
    21     (IV)  GREENVILLE BOROUGH                                       <--
    22         (A)  REDEVELOPMENT OF VARIOUS INDUSTRIAL
    23             PROPERTIES, INCLUDING CONSTRUCTION          3,000,000
    24         (B)  CONSTRUCTION COSTS RELATED TO THE
    25             EXPANSION OF THE GREENVILLE BOROUGH
    26             BUILDING                                      625,000
    27  (44)  Mifflin County (Reserved)
    28  (45)  Monroe County
    29     (i)  County projects (Reserved)                                <--
    30     (I)  COUNTY PROJECTS                                           <--
    20070H1589B2181                 - 80 -     

     1         (A)  ACQUISITION, CONSTRUCTION,
     2             INFRASTRUCTURE AND OTHER RELATED COSTS
     3             FOR THE EAST STROUDSBURG SCHOOL
     4             DISTRICT MEMORIAL STADIUM                   1,870,000
     5     (II)  COOLBAUGH TOWNSHIP
     6         (A)  ACQUISITION, CONSTRUCTION,
     7             INFRASTRUCTURE AND OTHER RELATED COSTS
     8             FOR THE POCONO MOUNTAIN PUBLIC LIBRARY
     9             BUILDING                                    1,000,000
    10         (B)  ACQUISITION, CONSTRUCTION,
    11             INFRASTRUCTURE AND OTHER RELATED COSTS
    12             FOR THE POCONO MOUNTAINS CORPORATE
    13             CENTER EAST                                 2,000,000
    14         (C)  ACQUISITION, CONSTRUCTION,
    15             INFRASTRUCTURE AND OTHER RELATED COSTS
    16             FOR THE POCONO MOUNTAINS CORPORATE
    17             CENTER EAST                                 4,000,000
    18         (D)  ACQUISITION, CONSTRUCTION,
    19             INFRASTRUCTURE AND OTHER RELATED COSTS
    20             FOR THE COMMERCE COURT EXTENSION            1,250,000
    21         (E)  ACQUISITION, CONSTRUCTION,
    22             INFRASTRUCTURE AND OTHER RELATED COSTS
    23             FOR THE POCONO MOUNTAIN ECONOMIC
    24             DEVELOPMENT RAIL SERVED BUSINESS PARK       2,000,000
    25     (ii) (III)  East Stroudsburg Borough                           <--
    26         (A)  Infrastructure and other related costs
    27             to renovate East Stroudsburg High
    28             School Memorial Stadium                     3,000,000
    29         (B)  Construction, acquisition,
    30             infrastructure, redevelopment and other
    20070H1589B2181                 - 81 -     

     1             costs related to the Pocono Mountains
     2             Regional Convention Center                 37,500,000
     3     (IV)  EAST STROUDSBURG TOWNSHIP                                <--
     4         (A)  ACQUISITION, CONSTRUCTION,
     5             INFRASTRUCTURE AND OTHER RELATED COSTS
     6             FOR A PARKING GARAGE ADJACENT TO POCONO
     7             MEDICAL CENTER                             10,000,000
     8         (B)  CONSTRUCTION OF COMPUTER SECURITY
     9             RESEARCH CENTER AT EAST STROUDSBURG
    10             UNIVERSITY RESEARCH AND TECHNOLOGY
    11             PARK                                        2,000,000
    12     (V)  EAST STROUDSBURG, STROUDSBURG AND MIDDLE
    13         SMITHFIELD TOWNSHIPS
    14         (A)  ACQUISITION, CONSTRUCTION,
    15             INFRASTRUCTURE AND OTHER RELATED COSTS
    16             FOR REHABILITATION OF EAST STROUDSBURG
    17             TO DELAWARE WATER LAP RAIL LINE             1,250,000
    18     (VI)  POCONO, PARADISE AND JACKSON TOWNSHIPS
    19         (A)  CONSTRUCTION OF BATHROOMS FOR PERSONS
    20             WITH DISABILITIES, FIELD IMPROVEMENTS
    21             AND RELATED INFRASTRUCTURE FOR
    22             CHALLENGER PROGRAM                            100,000
    23     (VII)  STROUDSBURG BOROUGH
    24         (A)  ACQUISITION, RESTORATION AND EXPANSION
    25             OF THE SHERMAN THEATER                      1,500,000
    26  (46)  Montgomery County
    27     (i)  County projects (Reserved)
    28     (ii)  Abington Township
    29         (A)  Acquisition, construction and other
    30             related costs for the renovation of the
    20070H1589B2181                 - 82 -     

     1             Abington Community Center                   1,000,000
     2         (B)  Acquisition, construction and other
     3             related costs to develop a civic
     4             facility as part of the Roslyn
     5             Redevelopment Program                      12,000,000
     6         (C)  Construction and other related costs
     7             for the renovation of the Ardsley
     8             Community Center                            1,000,000
     9     (iii)  Ambler Borough
    10         (A)  Construction and other related costs
    11             for the redevelopment of Main Street       10,000,000
    12     (IV)  GREEN LANE BOROUGH                                       <--
    13         (A)  GREEN LANE BOROUGH SIDEWALK
    14             INSTALLATION                                  750,000
    15     (iv) (V)  Jenkintown Borough                                   <--
    16         (A)  Construction and other related costs
    17             for the Southern Gateway multilevel
    18             parking garage                              6,000,000
    19     (VI)  LANSDALE BOROUGH                                         <--
    20         (A)  INFRASTRUCTURE AND OTHER RELATED COSTS
    21             FOR THE CONSTRUCTION OF A MULTIPURPOSE
    22             SENIOR COMMUNITY CENTER                     1,000,000
    23     (VII)  LIMERICK TOWNSHIP
    24         (A)  CONSTRUCTION OF A CHILD CARE CENTER AT
    25             THE SPRING VALLEY YMCA, INCLUDING LAND
    26             ACQUISITION                                 2,500,000
    27     (VIII)  LOWER PROVIDENCE TOWNSHIP
    28         (A)  RESTORATION OF JOHN JAMES AUDUBON
    29             CENTER, INCLUDING CONSTRUCTION AND
    30             RELATED INFRASTRUCTURE                      6,000,000
    20070H1589B2181                 - 83 -     

     1     (IX)  MARLBOROUGH TOWNSHIP
     2         (A)  ACQUISITION, RELATED INFRASTRUCTURE
     3             AND RESTORATION OF WETZEL'S MILL AND
     4             UNAMI CREEK PARK AREA, INCLUDING
     5             CONSTRUCTION                                1,000,000
     6     (X)  NORRISTOWN BOROUGH
     7         (A)  ACQUISITION, CONSTRUCTION,
     8             INFRASTRUCTURE AND OTHER RELATED COSTS
     9             FOR THE CULTURAL ARTS CENTER                3,000,000
    10     (XI)  PENNSBURG, RED HILL AND GREEN LANE
    11     BOROUGHS, MARLBOROUGH AND UPPER HANOVER
    12     TOWNSHIPS
    13         (A)  CONSTRUCTION, INFRASTRUCTURE, LAND
    14             ACQUISITION AND OTHER RELATED COSTS FOR
    15             THE GREATER UPPER PERKIOMEN VALLEY
    16             ECONOMIC DEVELOPMENT PROJECT                2,000,000
    17     (XII)  RED HILL BOROUGH
    18         (A)  EXPANSION OF UPPER PERKIOMEN VALLEY
    19             PUBLIC LIBRARY, INCLUDING
    20             INFRASTRUCTURE AND OTHER RELATED COSTS      1,000,000
    21     (XIII)  UPPER HANOVER TOWNSHIP
    22         (A)  ACQUISITION, CONSTRUCTION AND RELATED
    23             INFRASTRUCTURE FOR UPPER PERKIOMEN
    24             VALLEY YMCA                                 4,000,000
    25         (B)  CONSTRUCTION OF OUTPATIENT MEDICAL
    26             FACILITY AND MEDICAL OFFICE BUILDING AT
    27             ST. LUKE'S QUAKERTOWN HOSPITAL,
    28             INCLUDING RELATED INFRASTRUCTURE            1,000,000
    29     (XIV)  WEST NORRITON TOWNSHIP
    30         (A)  ACQUISITION AND RELATED COSTS FOR THE
    20070H1589B2181                 - 84 -     

     1             CONSTRUCTION OF THE AUDUBON AREA YMCA       3,000,000
     2  (47)  Montour County (Reserved)
     3  (48)  Northampton County
     4     (i)  County projects
     5         (A)  Construction, redevelopment and other
     6             related costs to build the SteelSax
     7             Performing Arts and Broadcast
     8             Center/Events Center                       12,000,000
     9     (ii)  Palmer Township
    10         (A)  Acquisition, construction and other
    11             related costs for the National High
    12             School Sports Hall of Fame Museum           5,000,000
    13  (49)  Northumberland County
    14     (i)  Point Township                                            <--
    15     (I)  COUNTY PROJECTS (RESERVED)                                <--
    16     (II)  MILTON BOROUGH
    17         (A)  ACQUISITION, CONSTRUCTION,
    18             INFRASTRUCTURE AND OTHER RELATED COSTS
    19             FOR A NEW MILTON PUBLIC LIBRARY             1,000,000
    20     (III)  POINT TOWNSHIP
    21         (A)  ACQUISITION, CONSTRUCTION,
    22             INFRASTRUCTURE AND OTHER RELATED COSTS
    23             FOR A RENEWABLE ENERGY PLANT                1,000,000
    24         (A)(B)  Construction and other related                     <--
    25             costs for the SunPoint Renewable Energy
    26             Project                                     1,000,000
    27  (50)  Perry County (Reserved)                                     <--
    28  (50)  PERRY COUNTY                                                <--
    29     (I)  COUNTY PROJECTS (RESERVED)
    30     (II)  PENN TOWNSHIP
    20070H1589B2181                 - 85 -     

     1         (A)  CONSTRUCTION OF NEW FACILITY TO HOUSE
     2             PRESCHOOL PROGRAM AND AFTER SCHOOL
     3             PROGRAM AT THE EARLY EDUCATION CENTER         500,000
     4     (III)  SPRING TOWNSHIP
     5         (A)  AUDUBON HAWK WATCH EXPANSION,
     6             INCLUDING CONSTRUCTION OF VIEWING AREA
     7             FOR PERSONS WITH DISABILITIES AND
     8             RELATED INFRASTRUCTURE IMPROVEMENTS           275,000
     9  (51)  Philadelphia County
    10     (i)  County projects
    11         (A)  Construction, infrastructure and other
    12             related costs for the expansion and
    13             rehabilitation of Children's Crisis
    14             Treatment Center                            4,000,000
    15     (ii)  City of Philadelphia
    16         (A)  Construction and other related costs
    17             for the University of Pennsylvania
    18             Research Center                            16,000,000
    19         (B)  Redevelopment and other costs related
    20             to the Inter-Community Development
    21             Corporation northwest neighborhood
    22             streetscape improvements                    1,500,000
    23         (C)  Construction, redevelopment and other
    24             costs associated with the Academy of
    25             Natural Science Exhibit                       500,000
    26         (D)  Construction, infrastructure,
    27             redevelopment and other related costs
    28             to upgrade and renovate the Curtis
    29             Institute for Music                        20,000,000
    30         (E)  Construction and other related costs
    20070H1589B2181                 - 86 -     

     1             for the Nueva Jerusalem mixed-use
     2             facility                                    1,500,000
     3         (F)  Construction, infrastructure and other
     4             related costs for the Pastore Unidos
     5             Por Filadelfia project related to
     6             minority and senior programming               500,000
     7         (G)  Construction and other related costs
     8             for the renovation and expansion of the
     9             Columbia North Community YMCA               3,600,000
    10         (H)  Construction, infrastructure and other
    11             related costs for the Betsy Ross House        500,000
    12         (I)  Infrastructure and other costs related
    13             to the Hunting Park 21st Century
    14             Community and Learning Center               1,000,000
    15         (J)  Construction, infrastructure and other
    16             related costs for the Stenton Service
    17             Wing Restoration Project                    1,000,000
    18         (K)  Construction, redevelopment and other
    19             costs related to the new Pleasant
    20             Playground building                         1,000,000
    21         (L)  Construction, acquisition, demolition
    22             and other costs associated with South
    23             Philadelphia Service Housing               10,000,000
    24         (M)  Construction and other related costs
    25             for the renovation of International
    26             House                                       8,000,000
    27         (N)  Acquisition, construction and other
    28             related costs for the redevelopment of
    29             the Historic John Grass Company
    30             Building                                      700,000
    20070H1589B2181                 - 87 -     

     1         (O)  Construction, infrastructure and other
     2             related costs for the Norris Square
     3             Children's Center                             500,000
     4         (P)  Construction and other related costs
     5             for North Philadelphia retail
     6             corridors                                   4,000,000
     7         (Q)  Construction, infrastructure and other
     8             related costs for a regional emergency
     9             services facility                          30,000,000
    10         (R)  Construction, infrastructure and other
    11             related costs for North Philadelphia
    12             recreation                                  5,000,000
    13         (S)  Acquisition, construction and other
    14             related costs for the Philadelphia
    15             Polytechnic Charter High School            10,000,000
    16         (T)  Construction and other related costs
    17             for the development of a skate park at
    18             Paine Park                                  2,750,000
    19         (U)  Construction and other related costs
    20             for improvements to the Friends Housing
    21             Cooperative Foundation facilities             250,000
    22         (V)  Acquisition, construction,
    23             infrastructure and other related costs
    24             for Chester Avenue revitalization           1,000,000
    25         (W)  Acquisition, construction,
    26             infrastructure and other related costs
    27             to revitalize the Market Street
    28             Corridor, including adjacent areas         30,000,000
    29         (X)  Construction, infrastructure and other
    30             related costs for the Children's Zoo        8,200,000
    20070H1589B2181                 - 88 -     

     1         (Y)  Construction, infrastructure and other
     2             related costs for the McNeil Aviary         6,000,000
     3         (Z)  Construction, infrastructure and other
     4             related costs for the Philadelphia Zoo
     5             Big Cat exhibit                             5,800,000
     6         (AA)  Construction and other related costs
     7             for the Washington Square
     8             redevelopment                               1,000,000
     9         (BB)  CONSTRUCTION OF NEW FACILITIES FOR                   <--
    10             THE WELLNESS COMMUNITY'S NATIONAL
    11             SURVIVORSHIP RESEARCH AND TRAINING
    12             INSTITUTE                                   5,000,000
    13         (CC)  FOR EXISTING BUILDING, GALLERY,
    14             EXHIBIT CONSTRUCTION AND RENOVATIONS
    15             INCLUDING CLIMATE CONTROL, ELECTRIC
    16             UPGRADES, TECHNOLOGY UPGRADES AND
    17             INFRASTRUCTURE                             15,000,000
    18         (DD)  FOR CONSTRUCTION OF NEW BUILDING FOR
    19             THE FRANKLIN INSTITUTE                     15,000,000
    20         (EE)  REHABILITATION AND EXPANSION OF THE
    21             MAIN SERVICE CENTER AT THE CHILDREN'S
    22             CRISIS TREATMENT CENTER, INCLUDING
    23             CONSTRUCTION                                4,000,000
    24         (FF)  ACQUISITION, CONSTRUCTION,
    25             INFRASTRUCTURE AND OTHER COSTS RELATED
    26             TO THE EXPANSION OF THE FOX CHASE
    27             RECREATIONAL CENTER                         1,200,000
    28  (52)  Pike County
    29     (i)  County projects (Reserved)
    30     (ii)  Lehman Township
    20070H1589B2181                 - 89 -     

     1         (A)  Redevelopment and other costs related
     2             to the completion and capital
     3             improvements to Mountain Laurel Center
     4             for the Performing Arts                       600,000
     5  (53)  Potter County (Reserved)
     6  (54)  Schuylkill County (Reserved)                                <--
     7  (54)  SCHUYLKILL COUNTY                                           <--
     8     (I)  COUNTY PROJECTS
     9         (A)  ACQUISITION, INFRASTRUCTURE AND OTHER
    10             COSTS RELATED TO THE CONSTRUCTION OF A
    11             REGIONAL INDUSTRIAL PARK                    1,000,000
    12     (II)  COALDALE BOROUGH
    13         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    14             COSTS RELATED TO THE RENOVATION OF THE
    15             COALDALE COMPLEX                            1,000,000
    16     (III)  ORWIGSBURG BOROUGH
    17         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    18             COSTS RELATED TO THE RENOVATION OF THE
    19             ORWIGSBURG MEMORIAL HALL                      500,000
    20         (B)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    21             COSTS RELATED TO THE RENOVATION OF THE
    22             ORWIGSBURG PUBLIC LIBRARY                     500,000
    23         (C)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    24             COSTS RELATED TO THE RENOVATION OF
    25             ORWIGSBURG BOROUGH HALL                       500,000
    26     (IV)  TAMAQUA BOROUGH
    27         (A)  RECONSTRUCTION OF WABASH CREEK STORM
    28             WATER TUNNEL AND DIVERSION SYSTEM           5,000,000
    29         (B)  REPAIRS TO THE TWO OWL CREEK DAMS,
    30             INCLUDING BREAST REPAIRS AND SPILLWAY
    20070H1589B2181                 - 90 -     

     1             CONSTRUCTION                                3,000,000
     2     (V)  WEST PENN TOWNSHIP
     3         (A)  ACQUISITION, INFRASTRUCTURE AND OTHER
     4             COSTS RELATED TO THE CONSTRUCTION OF A
     5             REGIONAL INDUSTRIAL PARK                    1,000,000
     6  (55)  Snyder County(Reserved                                      <--
     7  (55)  SNYDER COUNTY                                               <--
     8     (I)  COUNTY PROJECTS (RESERVED)
     9     (II)  SELINSGROVE BOROUGH
    10         (A)  CONSTRUCTION OF SUSQUEHANNA UNIVERSITY
    11             SCIENCE FACILITY                           15,000,000
    12         (B)  RENOVATION OF SUSQUEHANNA UNIVERSITY
    13             SCIENCE HALL, INCLUDING RELATED
    14             INFRASTRUCTURE                              6,000,000
    15  (56)  Somerset County (Reserved)                                  <--
    16  (56)  SOMERSET COUNTY                                             <--
    17     COUNTY PROJECTS (RESERVED)
    18     (II)  JEFFERSON TOWNSHIP
    19         (A)  SITE DEVELOPMENT, CONSTRUCTION AND
    20             INFRASTRUCTURE IMPROVEMENTS TO PROPERTY
    21             LOCATED ALONG ROUTE 31                     10,000,000
    22     (III)  SOMERSET TOWNSHIP
    23         (A)  REDEVELOPMENT, CONSTRUCTION AND
    24             RELATED INFRASTRUCTURE COSTS FOR LAUREL
    25             HIGHLANDS BUSINESS PARK                     5,000,000
    26  (57)  Sullivan County (Reserved)
    27  (58)  Susquehanna County (Reserved)
    28  (59)  Tioga County (Reserved)                                     <--
    29  (59)  TIOGA COUNTY                                                <--
    30     (I)  COUNTY PROJECTS (RESERVED)
    20070H1589B2181                 - 91 -     

     1     (II)  SHIPPEN TOWNSHIP
     2         (A)  EXPANSION AND CONSTRUCTION OF NATURE
     3             QUEST GEOTOURISM LODGE, INCLUDING
     4             ACQUISITION AND INFRASTRUCTURE             12,500,000
     5     (III)  WELLSBORO BOROUGH
     6         (A)  ACQUISITION, CONSTRUCTION AND
     7             INFRASTRUCTURE IMPROVEMENTS OF A
     8             COMMUNITY PERFORMING ARTS CENTER            7,500,000
     9  (60)  Union County (Reserved)                                     <--
    10  (60)  UNION COUNTY                                                <--
    11     (I)  COUNTY PROJECTS (RESERVED)
    12     (II)  KELLY TOWNSHIP
    13         (A)  EXPANSION AND RENOVATION OF
    14             EVANGELICAL COMMUNITY HOSPITAL,
    15             INCLUDING RELATED INFRASTRUCTURE           11,000,000
    16  (61)  Venango County (Reserved)                                   <--
    17  (61)  VENANGO COUNTY                                              <--
    18     (I)  COUNTY PROJECTS (RESERVED)
    19     (II)  EMLENTON BOROUGH
    20         (A)  ACQUISITION, SITE DEVELOPMENT AND
    21             CONSTRUCTION TO SUPPORT REVITALIZATION
    22             IN EMLENTON BOROUGH                           500,000
    23  (62)  Warren County (Reserved)
    24  (63)  Washington County
    25     (i)  County projects (Reserved)
    26     (ii)  Allenport Borough
    27         (A)  Acquisition, construction,
    28             infrastructure and other related costs
    29             to restore the Barge Shipping facility      1,250,000
    30     (iii)  California Borough
    20070H1589B2181                 - 92 -     

     1         (A)  Acquisition, construction,
     2             infrastructure and other related costs
     3             for the California Technology Park film
     4             industry project                            1,250,000
     5     (iv)  Canonsburg Borough
     6         (A)  Construction, infrastructure and other
     7             related costs for the Town Park
     8             project                                       940,000
     9     (v)  Carroll Township
    10         (A)  Construction and other related costs
    11             for the Monongahela Valley Hospital
    12             upgrade project                             3,000,000
    13     (vi)  Cecil Township
    14         (A)  Construction and development of
    15             recreation complex near Muse School
    16             property                                      500,000
    17     (vii)  Chartiers Township
    18         (A)  Construction and other related costs
    19             for the Chartiers Township community
    20             center                                        500,000
    21         (B)  Land acquisition and development of
    22             Chartiers Township recreation complex       5,000,000
    23     (viii)  City of Washington
    24         (A)  Construction and other related costs
    25             for the Crossroads Amphitheater             1,000,000
    26         (B)  Construction and other related costs
    27             for the redevelopment of Main and
    28             Maiden Streets                             15,000,000
    29         (C)  Improvements to the Washington Park
    30             recreation facility                         1,250,000
    20070H1589B2181                 - 93 -     

     1         (D)  Construction and other related costs
     2             for the Main Street Works Project          12,500,000
     3         (E)  Acquisition of land and construction
     4             of a police/fire safety building
     5             complex                                     3,000,000
     6     (ix)  Cross Creek Township
     7         (A)  Construction and other related costs
     8             for the Cedar Grove
     9             community/recreation project                  500,000
    10     (x)  Fallowfield Township
    11         (A)  Construction, infrastructure,
    12             acquisition and other costs related to
    13             the Shell Building and supporting
    14             infrastructure in Alta Vista Business
    15             Park                                        1,250,000
    16     (xi)  Mount Pleasant Township
    17         (A)  Construction and other related costs
    18             for the Hickory Main Street
    19             revitalization                                500,000
    20     (xii)  North Franklin Township
    21         (A)  Construction and other related costs
    22             for a new municipal office/community
    23             building                                    3,000,000
    24     (xiii)  North Strabane Township
    25         (A)  Construction and other related costs
    26             for the North Strabane Township
    27             community/recreation center                 1,000,000
    28     (xiv)  Roscoe Borough
    29         (A)  Construction, infrastructure and other
    30             related costs for community park
    20070H1589B2181                 - 94 -     

     1             improvements                                  500,000
     2     (xv)  South Strabane Township
     3         (A)  Construction, infrastructure and other
     4             related costs for the Zediker Station
     5             Business Park                               5,000,000
     6         (B)  Construction and other related costs
     7             for a police and road department
     8             facility                                      875,000
     9     (xvi)  Union Township
    10         (A)  Infrastructure, redevelopment,
    11             abatement of hazardous materials and
    12             other costs related to the Phoenix
    13             Business Park                               1,000,000
    14         (B)  Phoenix Business Park, environmental
    15             remediation, site preparation and
    16             infrastructure for development of a 58-
    17             acre business park                          1,000,000
    18     (xvii)  Washington Borough
    19         (A)  Construction, infrastructure,
    20             acquisition and other related costs to
    21             build a Washington Community Health
    22             Center                                      1,500,000
    23  (64)  WAYNE COUNTY                                                <--
    24     (I)  COUNTY PROJECTS (RESERVED)
    25     (II)  PALMYRA TOWNSHIP
    26         (A)  CONSTRUCTION AND INFRASTRUCTURE
    27             RELATED TO THE REDEVELOPMENT OF THE
    28             LAKE WALLENPAUPACK VISITORS CENTER          1,000,000
    29  (65)  Westmoreland County
    30     (i)  County projects (Reserved)
    20070H1589B2181                 - 95 -     

     1     (ii)  City of Greensburg
     2         (A)  Construction and other costs related
     3             to construction of an addition to the
     4             Seton Hill University Lynch Science
     5             Hall                                       15,000,000
     6         (B)  Acquisition, construction,
     7             infrastructure and other related costs
     8             for Greensburg Downtown revitalization      5,000,000
     9         (C)  Acquisition, construction,
    10             infrastructure and other related costs
    11             for the Westmoreland County Community
    12             College Sports and Recreation Facility      6,000,000
    13     (II.1)  HEMPFIELD TOWNSHIP                                     <--
    14         (A)  ACQUISITION, CONSTRUCTION,
    15             INFRASTRUCTURE AND OTHER RELATED COSTS
    16             TO EXPAND GREEN FORGE                         750,000
    17     (iii)  Latrobe Borough
    18         (A)  Renovation and expansion of St.
    19             Vincent College facilities                 15,000,000
    20         (B)  Construction and other related costs                  <--
    21             for the St. Vincent College, School of
    22             Science                                    15,000,000
    23     (iv)  New Kingston
    24         (A)  Construction and other related costs
    25             for the Alle-Kiski Education Center         2,500,000
    26     (IV)  NEW KINGSTON                                             <--
    27         (A)  CONSTRUCTION AND OTHER RELATED COSTS
    28             FOR THE ALLE-KISKI EDUCATION CENTER         2,500,000
    29     (IV.1)  UNITY TOWNSHIP
    30         (A)  CONSTRUCTION AND OTHER RELATED COSTS
    20070H1589B2181                 - 96 -     

     1             FOR THE ST. VINCENT COLLEGE, SCHOOL OF
     2             SCIENCE                                    15,000,000
     3         (B)  RENOVATION AND EXPANSION OF FACILITIES
     4             FOR THE HERBERT W. BOYER SCHOOL OF
     5             NATURAL SCIENCE, MATHEMATICS, AND
     6             COMPUTING, INCLUDING CONSTRUCTION          15,000,000
     7     (v)  Upper Burrell Township
     8         (A)  Acquisition, construction,
     9             infrastructure and other related costs
    10             of a manufacturing campus                   5,000,000
    11     (vi)  Youngwood Borough
    12         (A)  Construction, redevelopment and other
    13             costs related to the renovation of the
    14             Westmoreland County Community College
    15             Baseball Stadium                            2,500,000
    16  (66)  Wyoming County (Reserved)                                   <--
    17  (66)  WYOMING COUNTY                                              <--
    18     (I)  COUNTY PROJECTS (RESERVED)
    19     (II)  TUNKHANNOCK TOWNSHIP
    20         (A)  EXPANSION OF IMAGING DEPARTMENT,
    21             EMERGENCY DEPARTMENT AND OUTPATIENT
    22             REGISTRATION AREA AT TYLER MEMORIAL
    23             HOSPITAL, INCLUDING CONSTRUCTION            2,500,000
    24  (67)  York County
    25     (i)  County projects (Reserved)
    26     (ii)  City of York
    27         (A)  Construction, infrastructure,
    28             abatement of hazardous materials and
    29             other costs related to the Government
    30             Center Renovation Project                   8,500,000
    20070H1589B2181                 - 97 -     

     1         (B)  Acquisition, construction,
     2             infrastructure and other related costs
     3             for downtown community college campus       7,000,000
     4         (C)  Construction, acquisition,
     5             redevelopment, abatement of hazardous
     6             materials and other costs related to
     7             the Downtown York Historic Preservation
     8             and Revitalization Project                  9,000,000
     9     (iii)  Springettsbury Township
    10         (A)  Construction, infrastructure,
    11             abatement of hazardous materials and
    12             other costs associated with the
    13             Pleasant Acres Renovation Project          11,250,000
    14     (IV)  WEST MANHEIM TOWNSHIP                                    <--
    15         (A)  REDEVELOPMENT OF SOUTH WESTERN
    16             ELEMENTARY SCHOOL FOR USE AS TOWNSHIP
    17             ADMINISTRATIVE OFFICES, INCLUDING
    18             CONSTRUCTION AND RELATED
    19             INFRASTRUCTURE                              2,000,000
    20  (68)  MULTIPLE COUNTIES
    21     (I)  BUTLER AND MERCER COUNTIES
    22         (A)  SLIPPERY ROCK AND LIBERTY TOWNSHIPS
    23             (I)  ACQUISITION AND DEVELOPMENT OF
    24                 SLIPPERY ROCK BUSINESS PARK,
    25                 INCLUDING RELATED INFRASTRUCTURE        1,250,000
    26     (II)  SNYDER AND UNION COUNTIES
    27         (A)  COUNTY PROJECTS
    28             (I)  ACQUISITION, CONSTRUCTION,
    29                 INFRASTRUCTURE AND OTHER RELATED
    30                 COSTS FOR THE GREATER SUSQUEHANNA
    20070H1589B2181                 - 98 -     

     1                 VALLEY YMCA                             3,000,000
     2  Section 7.  Itemization of flood control projects.
     3     Additional capital projects in the category of flood control
     4  projects to be constructed by the Department of Environmental
     5  Protection, its successors or assigns, and to be financed by the
     6  incurring of debt are hereby itemized, together with their
     7  respective estimated costs, as follows:
     8                                                           Total
     9                                                          Project
    10             Project                                    Allocation
    11  (1)  Department of Environmental Protection
    12     (I)  BLAIR COUNTY                                              <--
    13         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    14             RELATED COSTS FOR THE MILL RUN
    15             REHABILITATION PROJECT                         76,000
    16     (II)  CHESTER COUNTY
    17         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    18             RELATED COSTS FOR THE BUSINESS 30 FLOOD
    19             CONTROL PROJECT                               900,000
    20     (III)  COLUMBIA COUNTY
    21         (A)  FISHING CREEK FLOOD CONTROL PROJECT,
    22             INCLUDING GRAVEL BAR REMOVAL                1,000,000
    23     (i) (IV) Crawford County                                       <--
    24         (A)  Conneautville Dam rehabilitation             750,000
    25     (ii) (V)  Monroe County                                        <--
    26         (A)  Additional funds to refurbish Brady's
    27             Lake Dam in order to rebid the project
    28             due to delays and poor performance in
    29             concrete mix design                         3,600,000
    30     (VI)  NORTHUMBERLAND COUNTY                                    <--
    20070H1589B2181                 - 99 -     

     1         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
     2             RELATED COSTS FOR THE SUSQUEHANNA RIVER
     3             CLEARING AND GRUBBING PROJECT                 200,000
     4         (B)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
     5             RELATED COSTS FOR THE REAGAN STREET
     6             UNDERPASS FLOODING ABATEMENT PROJECT        2,200,000
     7     (VII)  SCHUYLKILL COUNTY
     8         (A)  REPAIRS TO THE TWO OWL CREEK DAMS,
     9             INCLUDING BREAST REPAIRS AND SPILLWAY
    10             CONSTRUCTION IN BOROUGH OF TAMAQUA          3,000,000
    11         (B)  RECONSTRUCTION OF WABASH CREEK STORM
    12             WATER TUNNEL AND DIVERSION SYSTEM IN
    13             BOROUGH OF TAMAQUA                          5,000,000
    14     (VIII)  SOMERSET COUNTY
    15         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    16             RELATED COSTS FOR THE EAST MAIN STREET
    17             FLOOD PROTECTION PROJECT                    5,000,000
    18  Section 8.  Itemization of Keystone Recreation, Park and
    19                 Conservation Fund projects.
    20     Projects in the category of public improvement projects to be
    21  constructed by the Department of Conservation and Natural
    22  Resources, its successors or assigns, and to be financed by
    23  current revenues of the Keystone Recreation, Park and
    24  Conservation Fund are hereby itemized, together with their
    25  respective estimated costs, as follows:
    26                                                           Total
    27                                                          Project
    28             Project                                    Allocation
    29  (1)  Department of Conservation and Natural
    30     Resources
    20070H1589B2181                 - 100 -    

     1     (i)  Black Moshannon State Park
     2         (A)  Rehabilitate dam spillway and boat
     3             launch                                        400,000
     4             (Base Project Allocation - $400,000)
     5     (ii)  Blue Knob State Park
     6         (A)  Rehabilitate park facilities                 900,000
     7             (Base Project Allocation - $900,000)
     8         (B)  Rehabilitate day use area                  1,000,000
     9             (Base Project Allocation - $1,000,000)
    10     (iii)  Caledonia State Park
    11         (A)  Replace two bridges on main park road        600,000
    12             (Base Project Allocation - $600,000)
    13         (B)  Rehabilitate park campgrounds              1,100,000
    14             (Base Project Allocation - $1,100,000)
    15     (iv)  Codorus State Park
    16         (A)  Provide paving in park                       350,000
    17             (Base Project Allocation - $350,000)
    18     (v)  Denton Hill State Park
    19         (A)  Replace main park road/parking area          400,000
    20             (Base Project Allocation - $400,000)
    21     (vi)  Forest District 19
    22         (A)  Rehabilitate Egypt Meadows Dam               750,000
    23             (Base Project Allocation - $750,000)
    24     (vii)  Forest District 20
    25         (A)  Provide new resource management
    26             center                                      4,000,000
    27             (Base Project Allocation - $4,000,000)
    28     (viii)  Little Pine State Park
    29         (A)  Renovate restroom and lower picnic
    30             area                                          300,000
    20070H1589B2181                 - 101 -    

     1             (Base Project Allocation - $300,000)
     2     (ix)  Moshannon State Forest
     3         (A)  Provide cleanup to Quehanna reactor
     4             site                                        2,400,000
     5             (Base Project Allocation - $2,400,000)
     6     (x)  Prince Gallitzin State Park
     7         (A)  Replace two restrooms at the park            300,000
     8             (Base Project Allocation - $300,000)
     9         (B)  Pave roads within the park                   350,000
    10             (Base Project Allocation - $350,000)
    11     (xi)  Reeds Gap State Park
    12         (A)  Relocate park office building              1,500,000
    13             (Base Project Allocation - $1,500,000)
    14         (B)  Replace existing swimming pool             1,000,000
    15             (Base Project Allocation - $1,000,000)
    16     (xii)  S.B. Elliott State Park
    17         (A)  Provide ADA cabins and renovate
    18             washhouse                                   1,250,000
    19             (Base Project Allocation - $1,250,000)
    20     (xiii)  Shawnee State Park
    21         (A)  Repair joints in concrete spillway           300,000
    22             (Base Project Allocation - $300,000)
    23     (xiv)  Shikellamy State Park
    24         (A)  Project (PW 4182) to provide dock
    25             rehabilitation transient and launch
    26             areas                                         663,000
    27             (Base Project Allocation - $663,000)
    28         (B)  Renovate overlook road in the park           400,000
    29             (Base Project Allocation - $400,000)
    30     (xv)  Sinnemahoning State Park
    20070H1589B2181                 - 102 -    

     1         (A)  Repair dam spillway                          650,000
     2             (Base Project Allocation - $650,000)
     3     (xvi)  Various Parks and Forest Districts,
     4         Statewide
     5         (A)  Acquire land to be incorporated within
     6             the park system according to the
     7             Commonwealth's master plan                 10,000,000
     8             (Land Allocation - $10,000,000)
     9  Section 9.  Itemization of Environmental Stewardship Fund
    10                 projects.
    11     Projects in the category of public improvement projects to be
    12  constructed by the Department of Conservation and Natural
    13  Resources, its successors or assigns and to be financed by
    14  current revenues of the Environmental Stewardship Fund are
    15  hereby itemized together with their respective estimated
    16  financial costs as follows:
    17                                                           Total
    18                                                          Project
    19             Project                                    Allocation
    20  (1)  Department of Conservation and Natural
    21     Resources
    22     (i)  Bald Eagle State Park
    23         (A)  Rehabilitate roads within the park         1,600,000
    24             (Base Project Allocation - $1,600,000)
    25         (B)  Replace courtesy docks at eight public
    26             boat launches                                 300,000
    27             (Base Project Allocation - $300,000)
    28         (C)  Rehabilitate office and visitors'
    29             center                                      1,750,000
    30             (Base Project Allocation - $1,750,000)
    20070H1589B2181                 - 103 -    

     1     (ii)  Beltzville State Park
     2         (A)  Rehabilitate sewage treatment plant
     3             and correct sewer line infiltration           400,000
     4             (Base Project Allocation - $400,000)
     5     (iii)  Bendigo State Park
     6         (A)  Replace bathhouse, lifeguard station
     7             and day use restrooms in the park           1,000,000
     8             (Base Project Allocation - $1,000,000)
     9     (iv)  Canoe Creek State Park
    10         (A)  Rehabilitate sewage treatment plant          300,000
    11             (Base Project Allocation - $300,000)
    12     (v)  Chapman State Park
    13         (A)  Rehabilitate beach house and comfort
    14             station                                     1,900,000
    15             (Base Project Allocation - $1,900,000)
    16     (vi)  Cherry Springs State Park
    17         (A)  Replace pit latrines with flush
    18             restrooms and sewers                          770,000
    19             (Base Project Allocation - $770,000)
    20     (vii)  Clear Creek State Park
    21         (A)  Rehabilitate water system and replace
    22             pit latrines                                2,000,000
    23             (Base Project Allocation - $2,000,000)
    24         (B)  Rehabilitate park roads and bridges        1,500,000
    25             (Base Project Allocation - $1,500,000)
    26     (viii)  Colonel Denning State Park
    27         (A)  Provide new day restroom, sewage and
    28             shower house                                  350,000
    29             (Base Project Allocation - $350,000)
    30         (B)  Provide bathhouse, concession,
    20070H1589B2181                 - 104 -    

     1             restroom and sewage                           500,000
     2             (Base Project Allocation - $500,000)
     3     (ix)  Cook Forest State Park
     4         (A)  Rehabilitation of trail, Phase II            250,000
     5             (Base Project Allocation - $250,000)
     6         (B)  Rehabilitate five campground
     7             washhouses                                    600,000
     8             (Base Project Allocation - $600,000)
     9         (C)  Replace park office and visitors'
    10             center                                      2,000,000
    11             (Base Project Allocation - $2,000,000)
    12         (D)  Replace six river cabins                   2,200,000
    13             (Base Project Allocation - $2,200,000)
    14         (E)  Rehabilitate sewage system and
    15             repairs                                       750,000
    16             (Base Project Allocation - $750,000)
    17         (F)  Provide repairs to the water system          750,000
    18             (Base Project Allocation - $750,000)
    19         (G)  Rehabilitate road and parking lot          1,100,000
    20             (Base Project Allocation - $1,100,000)
    21     (x)  Colton Point State Park
    22         (A)  Replace two pit latrines with
    23             composting restroom, playground, picnic
    24             area and campground shower house            1,500,000
    25             (Base Project Allocation - $1,500,000)
    26     (xi)  Elk State Park
    27         (A)  Replace comfort station                      150,000
    28             (Base Project Allocation - $150,000)
    29     (xii)  Erie Bluffs State Park
    30         (A)  Construct entrance to the park               300,000
    20070H1589B2181                 - 105 -    

     1             (Base Project Allocation - $300,000)
     2     (xiii)  Evansburg State Park
     3         (A)  Provide road paving for the park             335,000
     4             (Base Project Allocation - $335,000)
     5         (B)  Replace sewer lines                          250,000
     6             (Base Project Allocation - $250,000)
     7         (C)  Replace temporary restrooms, Phase II        250,000
     8             (Base Project Allocation - $250,000)
     9     (xiv)  Forest District 2
    10         (A)  Construct new resource management
    11             center                                      3,500,000
    12             (Base Project Allocation - $3,500,000)
    13     (xv)  Forest District 3
    14         (A)  Establish new maintenance headquarter
    15             buildings in Juniata, Mifflin and Perry
    16             Counties                                      800,000
    17             (Base Project Allocation - $800,000)
    18         (B)  Rehabilitate Gunter Valley Dam in
    19             Perry County                                5,000,000
    20             (Base Project Allocation - $5,000,000)
    21     (xvi)  Forest District 4
    22         (A)  Rehabilitate Linn Run Road                 2,500,000
    23             (Base Project Allocation - $2,500,000)
    24     (xvii)  Forest District 5
    25         (A)  Rehabilitate resource management
    26             center                                      1,500,000
    27             (Base Project Allocation - $1,500,000)
    28     (xviii)  Forest District 8
    29         (A)  Rehabilitate Kittanning Resource
    30             Management Center                           1,500,000
    20070H1589B2181                 - 106 -    

     1             (Base Project Allocation - $1,500,000)
     2     (xix)  Forest District 14
     3         (A)  Rehabilitate historic stone house            250,000
     4             (Base Project Allocation - $250,000)
     5     (xx)  Forest District 18
     6         (A)  SR 54 comfort station and parking            500,000
     7             (Base Project Allocation - $500,000)
     8         (B)  New resource management center             3,500,000
     9             (Base Project Allocation - $3,500,000)
    10         (C)  Rehabilitate Roaring Creek tract
    11             facilities                                    600,000
    12             (Base Project Allocation - $600,000)
    13         (D)  Rehabilitate Roaring Creek tract
    14             trails and bridges                          1,155,000
    15             (Base Project Allocation - $1,155,000)
    16         (E)  Maintenance to Haldeman complex              300,000
    17             (Base Project Allocation - $300,000)
    18     (xxi)  Forest District 19
    19         (A)  New resource management center             3,500,000
    20             (Base Project Allocation - $3,500,000)
    21         (B)  Rehabilitate Little Summit Fire
    22             Station maintenance complex                   300,000
    23             (Base Project Allocation - $300,000)
    24         (C)  Project for Pine Flats Road                  200,000
    25             (Base Project Allocation - $200,000)
    26         (D)  Project for Flat Ridge Road                  200,000
    27             (Base Project Allocation - $200,000)
    28     (xxii)  Forest District 20
    29         (A)  Pave Dry Run Road                            300,000
    30             (Base Project Allocation - $300,000)
    20070H1589B2181                 - 107 -    

     1         (B)  Provide for Hillsgrove storage
     2             building                                      300,000
     3             (Base Project Allocation - $300,000)
     4         (C)  Pave High Knob Road                          500,000
     5             (Base Project Allocation - $500,000)
     6     (xxiii)  Frances Slocum State Park
     7         (A)  Rehabilitate sewage treatment plant
     8             and lines                                     600,000
     9             (Base Project Allocation - $600,000)
    10     (xxiv)  French Creek State Park
    11         (A)  Rehabilitate Scotts Run area               1,500,000
    12             (Base Project Allocation - $1,500,000)
    13     (xxv)  Gifford Pinchot State Park
    14         (A)  Phase II rehabilitation of camp area
    15             washhouse                                     400,000
    16             (Base Project Allocation - $400,000)
    17     (xxvi)  Gouldsboro State Park
    18         (A)  Repair dam at the park                       750,000
    19             (Base Project Allocation - $750,000)
    20         (B)  Replace pit bathhouse, comfort station
    21             and boat rental                               600,000
    22             (Base Project Allocation - $600,000)
    23     (xxvii)  Greenwood Furnace State Park
    24         (A)  Make repairs to sewage treatment
    25             plant                                         900,000
    26             (Base Project Allocation - $900,000)
    27     (xxviii)  Hickory Run State Park
    28         (A)  Replace pit latrines and water tank        1,800,000
    29             (Base Project Allocation - $1,800,000)
    30         (B)  Phase II of group camp roof
    20070H1589B2181                 - 108 -    

     1             replacement                                   200,000
     2             (Base Project Allocation - $200,000)
     3         (C)  Replace office and visitors' center        2,000,000
     4             (Base Project Allocation - $2,000,000)
     5         (D)  Replace pit toilets and four
     6             buildings                                   1,250,000
     7             (Base Project Allocation - $1,250,000)
     8     (xxix)  Hills Creek State Park
     9         (A)  Rehabilitate spillway                        600,000
    10             (Base Project Allocation - $600,000)
    11         (B)  Provide office renovation addition and
    12             visitors' center                            2,100,000
    13             (Base Project Allocation - $2,100,000)
    14     (xxx)  Hyner Run State Park
    15         (A)  Rehabilitate two park bridges and pave
    16             roadway                                       600,000
    17             (Base Project Allocation - $600,000)
    18         (B)  Replace two day use restrooms                300,000
    19             (Base Project Allocation - $300,000)
    20     (xxxi)  Kettle Creek State Park
    21         (A)  Provide bathhouse, shower house and
    22             sewage                                      1,800,000
    23             (Base Project Allocation - $1,800,000)
    24     (xxxii)  Kooser State Park
    25         (A)  Rehabilitate park roads and bridges        1,300,000
    26             (Base Project Allocation - $1,300,000)
    27     (xxxiii)  Lackawanna State Park
    28         (A)  Replace park office                        1,500,000
    29             (Base Project Allocation - $1,500,000)
    30         (B)  Rehabilitate pool complex and day use
    20070H1589B2181                 - 109 -    

     1             area                                        3,000,000
     2             (Base Project Allocation - $3,000,000)
     3     (xxxiv)  Laurel Hill State Park
     4         (A)  Breach Spruce Run Dam                        250,000
     5             (Base Project Allocation - $250,000)
     6         (B)  Provide Jones Mill Run Dam dredging          250,000
     7             (Base Project Allocation - $250,000)
     8         (C)  Rehabilitate group camp three sewage
     9             lines                                         250,000
    10             (Base Project Allocation - $250,000)
    11         (D)  Provide camping cottage shower house
    12             at the park                                   650,000
    13             (Base Project Allocation - $650,000)
    14         (E)  Rehabilitate contact station and
    15             parking                                       500,000
    16             (Base Project Allocation - $500,000)
    17     (xxxv)  Laurel Ridge State Park
    18         (A)  Replace turnpike trail bridge
    19             superstructure                              1,200,000
    20             (Base Project Allocation - $1,200,000)
    21     (xxxvi)  Little Pine State Park
    22         (A)  Rehabilitate dam                             500,000
    23             (Base Project Allocation - $500,000)
    24     (xxxvii)  Lyman Run State Park
    25         (A)  Provide construction to the spillway
    26             bridge                                        500,000
    27             (Base Project Allocation - $500,000)
    28     (xxxviii)  Marsh Creek State Park
    29         (A)  Pave all parking lots in the park            325,000
    30             (Base Project Allocation - $325,000)
    20070H1589B2181                 - 110 -    

     1         (B)  Provide ADA office expansion                 150,000
     2             (Base Project Allocation - $150,000)
     3     (xxxix)  McConnells Mill State Park
     4         (A)  Rehabilitate the park road                   275,000
     5             (Base Project Allocation - $275,000)
     6     (xl)  Moraine State Park
     7         (A)  Resurface bike trail in park               1,200,000
     8             (Base Project Allocation - $1,200,000)
     9         (B)  Rehabilitate Old 422 launch and road       1,000,000
    10             (Base Project Allocation - $1,000,000)
    11     (xli)  Neshaminy State Park
    12         (A)  Rehabilitate jetty                           350,000
    13             (Base Project Allocation - $350,000)
    14     (xlii)  Nockamixon State Park
    15         (A)  Provide paving in the park                   500,000
    16             (Base Project Allocation - $500,000)
    17         (B)  Replace three pit toilets                  1,000,000
    18             (Base Project Allocation - $1,000,000)
    19     (xliii)  Ohiopyle State Park
    20         (A)  Rehabilitate residence                       250,000
    21             (Base Project Allocation - $250,000)
    22         (B)  Replace bridge 0902-CSX 2288                 300,000
    23             (Base Project Allocation - $300,000)
    24         (C)  Construct parking above new office           900,000
    25             (Base Project Allocation - $900,000)
    26         (D)  Provide park office accessibility          2,000,000
    27             (Base Project Allocation - $2,000,000)
    28         (E)  Provide bathhouse, shower house and
    29             sewage                                        275,000
    30             (Base Project Allocation - $275,000)
    20070H1589B2181                 - 111 -    

     1     (xliv)  Oil Creek State Park
     2         (A)  Rehabilitate Boughton Bridge                 400,000
     3             (Base Project Allocation - $400,000)
     4         (B)  Phase I to repair trail slips                300,000
     5             (Base Project Allocation - $300,000)
     6     (xlv)  Parker Dam State Park
     7         (A)  Rehabilitate dam spillway                    350,000
     8             (Base Project Allocation - $350,000)
     9     (xlvi)  Park Region 1
    10         (A)  Rehabilitate surface water
    11             systems/filter                                300,000
    12             (Base Project Allocation - $300,000)
    13         (B)  Rehabilitate surface and well water
    14             supplies in Region 1 State parks            1,500,000
    15             (Base Project Allocation - $1,500,000)
    16     (xlvii)  Park Region 2
    17         (A)  Rehabilitate the residence                   250,000
    18             (Base Project Allocation - $250,000)
    19     (xlviii)  Pine Grove Furnace State Park
    20         (A)  Rehabilitate water treatment plant         2,000,000
    21             (Base Project Allocation - $2,000,000)
    22         (B)  Rehabilitate various buildings             3,400,000
    23             (Base Project Allocation - $3,400,000)
    24     (xlix)  Presque Isle State Park
    25         (A)  Provide bike trail extension to the
    26             Tom Ridge Environmental Center              1,800,000
    27             (Base Project Allocation - $1,800,000)
    28     (l)  Prince Gallitzin State Park
    29         (A)  Rehabilitate sewage treatment plant          800,000
    30             (Base Project Allocation - $800,000)
    20070H1589B2181                 - 112 -    

     1         (B)  Rehabilitate Beaver Valley Marina          2,900,000
     2             (Base Project Allocation - $2,900,000)
     3     (li)  Promised Land State Park
     4         (A)  Rehabilitate sewer line                      750,000
     5             (Base Project Allocation - $750,000)
     6         (B)  Replace bridge and spillway                3,100,000
     7             (Base Project Allocation - $3,100,000)
     8         (C)  Rehabilitate Pickerel Point and
     9             Deerfield campgrounds                       3,000,000
    10             (Base Project Allocation - $3,000,000)
    11         (D)  Rehabilitate boat rental area                500,000
    12             (Base Project Allocation - $500,000)
    13         (E)  Rehabilitate dump station                    300,000
    14             (Base Project Allocation - $300,000)
    15         (F)  Rehabilitate bridges                         120,000
    16             (Base Project Allocation - $120,000)
    17     (lii)  Pymatuning State Park
    18         (A)  Rehabilitate Espyville south launch
    19             and environs                                1,500,000
    20             (Base Project Allocation - $1,500,000)
    21         (B)  Rehabilitate Jamestown beach house           650,000
    22             (Base Project Allocation - $650,000)
    23         (C)  Rehabilitate sanitary facilities on
    24             the west side                               2,200,000
    25             (Base Project Allocation - $2,200,000)
    26     (liii)  Raccoon Creek State Park
    27         (A)  Provide roadway slip repairs                 800,000
    28             (Base Project Allocation - $800,000)
    29         (B)  Phase II rehabilitation of roads             300,000
    30             (Base Project Allocation - $300,000)
    20070H1589B2181                 - 113 -    

     1     (liv)  Ralph Stover State Park
     2         (A)  Replace pit latrines and sewer               500,000
     3             (Base Project Allocation - $500,000)
     4     (lv)  Ricketts Glen State Park
     5         (A)  Rehabilitate bathhouse and comfort
     6             stations                                    2,800,000
     7             (Base Project Allocation - $2,800,000)
     8         (B)  Rehabilitate roads and provide paving
     9             for parking lots                              650,000
    10             (Base Project Allocation - $650,000)
    11         (C)  Replace pit latrine Route 118 picnic
    12             area                                          400,000
    13             (Base Project Allocation - $400,000)
    14         (D)  Repair infiltration, sewage treatment
    15             plant and water system                        550,000
    16             (Base Project Allocation - $550,000)
    17     (lvi)  Ridley Creek State Park
    18         (A)  Reroof maintenance building                  400,000
    19             (Base Project Allocation - $400,000)
    20         (B)  Pave parking lot                             300,000
    21             (Base Project Allocation - $300,000)
    22     (lvii)  Salt Springs State Park
    23         (A)  Replace vault latrine                        300,000
    24             (Base Project Allocation - $300,000)
    25     (lviii)  Samuel S. Lewis State Park
    26         (A)  Provide two new comfort stations with
    27             on-lot sewage                                 750,000
    28             (Base Project Allocation - $750,000)
    29     (lix)  Shawnee State Park
    30         (A)  Rehabilitate water treatment plant         1,200,000
    20070H1589B2181                 - 114 -    

     1             (Base Project Allocation - $1,200,000)
     2     (lx)  Sinnemahoning State Park
     3         (A)  Rehabilitate main park road and
     4             replace bridges                             1,000,000
     5             (Base Project Allocation - $1,000,000)
     6     (lxi)  Sizerville State Park
     7         (A)  Modernize pit latrines and bathhouse       2,000,000
     8             (Base Project Allocation - $2,000,000)
     9         (B)  Provide new park office and visitors'
    10             center                                      1,800,000
    11             (Base Project Allocation - $1,800,000)
    12     (lxii)  Tiadaghton State Forest
    13         (A)  Construct Tiadaghton Management
    14             Center                                      4,500,000
    15             (Base Project Allocation - $4,500,000)
    16     (lxiii)  Tobyhanna State Park
    17         (A)  Rehabilitate day use area and
    18             campground                                  2,500,000
    19             (Base Project Allocation - $2,500,000)
    20     (lxiv)  Whipple Dam State Park
    21         (A)  Provide new multifunction beach
    22             building                                    1,200,000
    23             (Base Project Allocation - $1,200,000)
    24     (lxv)  Yellow Creek State Park
    25         (A)  Provide camping cottage shower house         650,000
    26             (Base Project Allocation - $650,000)
    27     (lxvi)  White Clay Creek Preserve
    28         (A)  Rebuild London Tract wall                    150,000
    29             (Base Project Allocation - $150,000)
    30     (lxvii)  Worlds End State Park
    20070H1589B2181                 - 115 -    

     1         (A)  Rehabilitate campground and day use
     2             area roads                                    350,000
     3             (Base Project Allocation - $350,000)
     4     (lxviii)  Various parks, Statewide
     5         (A)  Acquire land to be incorporated within
     6             the park system according to the
     7             Commonwealth's master plan                 10,000,000
     8             (Land Allocation - $10,000,000)
     9  Section 10.  Itemization of State forestry bridge projects.
    10     Projects in the category of State forestry bridge projects to
    11  be constructed by the Department of Conservation and Natural
    12  Resources, its successors or assigns, and to be financed by oil
    13  company franchise tax revenues pursuant to 75 Pa.C.S. §
    14  9502(a)(2)(iv) (relating to imposition of tax) are hereby
    15  itemized, together with their respective estimated costs, as
    16  follows:
    17                                                           Total
    18                                                          Project
    19             Project                                    Allocation
    20  (1)  Centre County
    21     (i)  Forest District 9
    22         (A)  Project for Meyers Run Road and Black
    23             Moshannon Creek                               400,000
    24         (B)  Project for North Run Road over Smays
    25             Run                                           300,000
    26  (2)  Clearfield County
    27     (i)  Forest District 9
    28         (A)  Project for Shirks Road over Black
    29             Moshannon Creek bridge No. 9-0028             300,000
    30         (B)  Project for Reservoir Road over Upper
    20070H1589B2181                 - 116 -    

     1             Three Run                                     300,000
     2         (C)  Project for Little Medix Road over
     3             Little Medix Run, bridge No. 9-0012           300,000
     4  (3)  Clinton County
     5     (i)  Forest District 10
     6         (A)  Project for Beaver Dam Road over
     7             Beaver Dam Run                                300,000
     8         (B)  Project for Birch Island Road over
     9             Amos Branch, bridge No. 10-0040               300,000
    10  (4)  Elk County
    11     (i)  Forest District 13
    12         (A)  Project for East Hicks Road over Barr
    13             Hollow                                        300,000
    14         (B)  Project for Little Dents Road over
    15             Dents Run Bridge No. 13-0032                  300,000
    16         (C)  Project for Dents Run Road over Little
    17             Bear Run                                      300,000
    18         (D)  Project for Dents Run Road over
    19             Weatherboard Run                              300,000
    20         (E)  Project for bridge over North Fork           300,000
    21  (5)  Huntingdon County
    22     (i)  Forest District 5
    23         (A)  Project for Krise Valley Road bridge         300,000
    24  (6)  Lycoming County
    25     (i)  Forest District 12
    26         (A)  Project for Trout Run Road and
    27             bridges                                       600,000
    28         (B)  Project for Frances Road over unnamed
    29             tributary near Black Forest Trail             300,000
    30  (7)  Perry County
    20070H1589B2181                 - 117 -    

     1     (i)  Forest District 3
     2         (A)  Project for the Second Narrows Road
     3             bridge                                        300,000
     4  (8)  Tioga County
     5     (i)  Forest District 12
     6         (A)  Project for Francis Road over unnamed
     7             tributary at Pipeline Road                    300,000
     8         (B)  Project for Francis Road over Woodward
     9             Hollow                                        300,000
    10         (C)  Project for Francis Road over Randall
    11             Hollow bridge No. 12-9003                     300,000
    12         (D)  Project for Francis Road over Kramer
    13             Hollow bridge No. 12-9016                     300,000
    14         (E)  Project for Francis Road over Francis
    15             Branch bridge No. 12-0048                     300,000
    16     (ii)  Forest District 16
    17         (A)  Project for Spoor Hollow Road over
    18             Norris Brook bridge No. 16-0001               300,000
    19         (B)  Project for Cedar Mountain Road over
    20             Cedar Run bridge No. 16-0014                  300,000
    21  (9)  Union County
    22     (i)  Forest District 7
    23         (A)  Replace Brandon Road bridge                  300,000
    24         (B)  Project for Cooper Mill Road bridge          300,000
    25  (10)  Clearfield and Elk Counties
    26     (i)  Forest District 9
    27         (A)  Project for three culverts on Little
    28             Medix Road over Little Medix Run              400,000
    29  Section 11.  Itemization of General Fund current revenue
    30                 projects.
    20070H1589B2181                 - 118 -    

     1     The individual capital projects in the category of public
     2  improvement projects to be constructed or acquired by the
     3  Department of General Services, its successors or assigns, and
     4  to be financed from General Fund current revenues, are hereby
     5  itemized, together with their respective estimated financial
     6  costs, as follows:
     7                                                           Total
     8                                                          Project
     9             Project                                    Allocation
    10  (1)  Department of Corrections
    11     (i)  State Correctional Institution at Albion
    12         (A)  Lease and/or purchase an emergency
    13             housing facility along with related
    14             infrastructure improvements                 2,000,000
    15             (Base Project Allocation - $2,000,000)
    16     (ii)  State Correctional Institution at
    17         Cambridge Springs
    18         (A)  Lease and/or purchase an emergency
    19             housing facility along with related
    20             infrastructure improvements                 2,000,000
    21             (Base Project Allocation - $2,000,000)
    22     (iii)  State Correctional Institution at
    23         Greensburg
    24         (A)  Lease and/or purchase an emergency
    25             housing facility along with related
    26             infrastructure improvements                 2,000,000
    27             (Base Project Allocation - $2,000,000)
    28     (iv)  State Correctional Institution at
    29         Houtzdale
    30         (A)  Lease and/or purchase an emergency
    20070H1589B2181                 - 119 -    

     1             housing facility along with related
     2             infrastructure improvements                 2,000,000
     3             (Base Project Allocation - $2,000,000)
     4     (v)  State Correctional Institution at Laurel
     5         Highlands
     6         (A)  Lease and/or purchase two separate
     7             emergency housing facilities along with
     8             related infrastructure improvements         4,000,000
     9             (Base Project Allocation - $4,000,000)
    10     (vi)  State Correctional Institution at Mahanoy
    11         (A)  Lease and/or purchase an emergency
    12             housing facility along with related
    13             infrastructure improvements                 2,000,000
    14             (Base Project Allocation - $2,000,000)
    15     (vii)  State Correctional Institution at Muncy
    16         (A)  Lease and/or purchase two separate
    17             emergency housing facilities along with
    18             related infrastructure improvements         4,000,000
    19             (Base Project Allocation - $4,000,000)
    20     (viii)  State Correctional Institution at Pine
    21         Grove
    22         (A)  Lease and/or purchase an emergency
    23             housing facility along with related
    24             infrastructure improvements                 2,000,000
    25             (Base Project Allocation - $2,000,000)
    26     (ix)  State Correctional Institution at Retreat
    27         (A)  Lease and/or purchase an emergency
    28             housing facility along with related
    29             infrastructure improvements                 3,500,000
    30             (Base Project Allocation - $3,500,000)
    20070H1589B2181                 - 120 -    

     1     (x)  State Correctional Institution at Rockview
     2         (A)  Lease and/or purchase an emergency
     3             housing facility along with related
     4             infrastructure improvements                 2,000,000
     5             (Base Project Allocation - $2,000,000)
     6  (2)  Pennsylvania Historical and Museum Commission
     7     (i)  Pennsylvania Military Museum
     8         (A)  Design and construct a 2,500-square-
     9             foot storage building for historical
    10             military vehicles                             600,000
    11             (Base Project Allocation - $500,000)
    12             (Design and Contingencies - $100,000)
    13  Section 11.1.  Itemization of Manufacturing Fund Current Revenue
    14                     Projects.
    15     (a)  Public improvement projects.--The individual capital
    16  projects in the category of public improvement projects to be
    17  developed by the Department of General Services, its successors
    18  or assigns, for the Department of Corrections and to be financed
    19  from current revenues of the Manufacturing Fund are hereby
    20  itemized together with their respective itemized costs as
    21  follows:
    22                                                           Total
    23                                                          Project
    24             Project                                    Allocation
    25  (1)  Department of Corrections
    26     (i)  State Correctional Institution at
    27         Frackville
    28         (A)  Modify an existing building into a
    29             regional laundry facility for
    30             correctional industries including
    20070H1589B2181                 - 121 -    

     1             laundry equipment                           3,000,000
     2             (Base Project Allocation - $3,000,000)
     3  Section 11.2.  Limited waiver of local requirements.
     4     The limitation on Department of Transportation funding of
     5  capital projects under 74 Pa.C.S. § 1302(4) (relating to program
     6  authorizations) shall be totally waived for the capital projects
     7  in the category of transportation assistance projects for mass
     8  transit contained in section 5(a)(7.1)(iv) and (v).
     9  Section 12.  Debt authorization.
    10     (a)  Public improvements.--The Governor, Auditor General and
    11  State Treasurer are hereby authorized and directed to borrow
    12  from time to time in addition to any authorization heretofore or
    13  hereafter enacted, on the credit of the Commonwealth, subject to
    14  the limitations provided in the current capital budget, money
    15  not exceeding in the aggregate the sum of $1,496,841,000          <--
    16  $1,548,730,000 as may be found necessary to carry out the         <--
    17  acquisition and construction of the public improvement projects
    18  specifically itemized in a capital budget.
    19     (b)  Furniture and equipment.--The Governor, Auditor General
    20  and State Treasurer are hereby authorized and directed to borrow
    21  from time to time in addition to any authorization heretofore or
    22  hereafter enacted, on the credit of the Commonwealth, subject to
    23  the limitations provided in the current capital budget, money
    24  not exceeding in the aggregate the sum of $81,846,000 as may be
    25  found necessary to carry out the acquisition and construction of
    26  the public improvement projects consisting of the acquisition of
    27  original movable furniture and equipment specifically itemized
    28  in a capital budget.
    29     (c)  Transportation assistance.--The Governor, Auditor
    30  General and State Treasurer are hereby authorized and directed
    20070H1589B2181                 - 122 -    

     1  to borrow from time to time in addition to any authorization
     2  heretofore or hereafter enacted, on the credit of the
     3  Commonwealth, subject to the limitations provided in the current
     4  capital budget, money not exceeding in the aggregate the sum of
     5  $414,718,000 $428,978,000 as may be found necessary to carry out  <--
     6  the acquisition and construction of the transportation
     7  assistance projects specifically itemized in a capital budget.
     8     (d)  Redevelopment assistance.--Subject to the limitation in
     9  section 317(b) of the act of February 9, 1999 (P.L.1, No.1),
    10  known as the Capital Facilities Debt Enabling Act, the Governor,
    11  Auditor General and State Treasurer are hereby authorized and
    12  directed to borrow from time to time in addition to any
    13  authorization heretofore or hereafter enacted, on the credit of
    14  the Commonwealth, subject to the limitations provided in the
    15  current capital budget, money not exceeding in the aggregate the
    16  sum of $1,340,008,000 $1,847,616,000 as may be found necessary    <--
    17  to carry out the redevelopment assistance and the redevelopment
    18  assistance capital projects specifically itemized in a capital
    19  budget.
    20     (e)  Flood control.--The Governor, Auditor General and State
    21  Treasurer are hereby authorized and directed to borrow from time
    22  to time in addition to any authorization heretofore or hereafter
    23  enacted, on the credit of the Commonwealth, subject to the
    24  limitations provided in the current capital budget, money not
    25  exceeding in the aggregate the sum of $4,350,000 $21,726,000 as   <--
    26  may be found necessary to carry out the acquisition and
    27  construction of the flood control projects specifically itemized
    28  in a capital budget.
    29  Section 13.  Issue of bonds.
    30     The indebtedness authorized in this act shall be incurred
    20070H1589B2181                 - 123 -    

     1  from time to time and shall be evidenced by one or more series
     2  of general obligation bonds of the Commonwealth in such
     3  aggregate principal amount for each series as the Governor, the
     4  Auditor General and the State Treasurer shall determine, but the
     5  latest stated maturity date shall not exceed the estimated
     6  useful life of the projects being financed as stated in section
     7  15.
     8  Section 14.  Estimated useful life and term of debt.
     9     (a)  Estimated useful life.--The General Assembly states that
    10  the estimated useful life of the public improvement projects
    11  itemized in this act is as follows:
    12         (1)  Public improvement projects, 30 years.
    13         (2)  Furniture and equipment projects, 10 years.
    14         (3)  Transportation assistance projects:
    15             (i)  Rolling stock, 15 years.
    16             (ii)  Passenger buses, 12 years.
    17             (iii)  Furniture and equipment, 10 years.
    18             (iv)  All others, 30 years.
    19     (b)  Term of debt.--The maximum term of the debt authorized
    20  to be incurred under this act is 30 years.
    21  Section 15.  Appropriations.
    22     (a)  Public improvements.--The net proceeds of the sale of
    23  the obligations authorized in this act are hereby appropriated
    24  from the Capital Facilities Fund to the Department of General
    25  Services in the maximum amount of $1,496,841,000 $1,548,730,000   <--
    26  to be used by it exclusively to defray the financial cost of the
    27  public improvement projects specifically itemized in a capital
    28  budget. After reserving or paying the expenses of the sale of
    29  the obligation, the State Treasurer shall pay to the Department
    30  of General Services the moneys as required and certified by it
    20070H1589B2181                 - 124 -    

     1  to be legally due and payable.
     2     (b)  Furniture and equipment.--The net proceeds of the sale
     3  of the obligations authorized in this act are hereby
     4  appropriated from the Capital Facilities Fund to the Department
     5  of General Services in the maximum amount of $81,846,000 to be
     6  used by it exclusively to defray the financial cost of the
     7  public improvement projects consisting of the acquisition of
     8  original movable furniture and equipment specifically itemized
     9  in a capital budget. After reserving or paying the expenses of
    10  the sale of the obligation, the State Treasurer shall pay to the
    11  Department of General Services the moneys as required and
    12  certified by it to be legally due and payable.
    13     (c)  Transportation assistance.--The net proceeds of the sale
    14  of the obligations authorized in this act are hereby
    15  appropriated from the Capital Facilities Fund to the Department
    16  of Transportation in the maximum amount of $414,718,000           <--
    17  $428,978,000 to be used by it exclusively to defray the           <--
    18  financial cost of the transportation assistance projects
    19  specifically itemized in a capital budget. After reserving or
    20  paying the expenses of the sale of the obligation, the State
    21  Treasurer shall pay to the Department of Transportation the
    22  moneys as required and certified by it to be legally due and
    23  payable.
    24     (d)  Redevelopment assistance.--The net proceeds of the sale
    25  of the obligations authorized in this act are hereby
    26  appropriated from the Capital Facilities Fund to the Department
    27  of Community and Economic Development in the maximum amount of
    28  $1,340,008,000 $1,847,616,000 to be used by it exclusively to     <--
    29  defray the financial cost of the redevelopment assistance and
    30  redevelopment assistance capital projects specifically itemized
    20070H1589B2181                 - 125 -    

     1  in a capital budget. After reserving or paying the expenses of
     2  the sale of the obligation, the State Treasurer shall pay to the
     3  Department of Community and Economic Development the moneys as
     4  required and certified by it to be legally due and payable.
     5     (e)  Flood control.--The net proceeds of the sale of the
     6  obligations authorized in this act are hereby appropriated from
     7  the Capital Facilities Fund to the Department of Environmental
     8  Protection in the maximum amount of $4,350,000 $21,726,000 to be  <--
     9  used by it exclusively to defray the financial cost of the flood
    10  control projects specifically itemized in a capital budget.
    11  After reserving or paying the expenses of the sale of the
    12  obligation, the State Treasurer shall pay to the Department of
    13  Environmental Protection the moneys as required and certified by
    14  it to be legally due and payable.
    15  Section 16.  Federal funds.
    16     In addition to those funds appropriated in section 15, all
    17  moneys received from the Federal Government for the projects
    18  specifically itemized in this act are also hereby appropriated
    19  for those projects.
    20  Section 17.  Delegation.
    21     Notwithstanding any provision of law to the contrary, the
    22  Department of General Services may delegate the design and
    23  construction of the project contained in section 3(9)(iv)(A) to
    24  Drexel University.
    25  Section 18.  Department of Corrections facilities.
    26     (a)  Preemption of local ordinances.--Capital projects in the
    27  category of public improvement projects specifically itemized
    28  for the Department of Corrections in section 3(4)(i), (iii),
    29  (vi), (ix), (x)(B), (xi)(B), (xii)(B), (xiii), (xiv) and (xv)(B)
    30  of this act are hereby authorized to be constructed, erected or
    20070H1589B2181                 - 126 -    

     1  acquired by the Department of General Services, its successors
     2  or assigns, of the Department of Corrections, notwithstanding
     3  any zoning ordinance, land use ordinance, building code or other
     4  regulation adopted or enacted by a political subdivision under
     5  the authority of any statute or under the authority of any home
     6  rule charter authorized and adopted under any statute or the
     7  Constitution of Pennsylvania.
     8     (b)  Preemption of local ordinances for 2005-2006 projects.--
     9  Capital projects in the category of public improvement projects
    10  specifically itemized for the Department of Corrections in
    11  section 3(5)(iv.2)(A), (iv.4)(A) and (v.1)(A) of the act of July
    12  7, 2006 (P.L.390, No.83), known as the Capital Budget Project
    13  Itemization Act of 2005-2006, are hereby authorized to be
    14  constructed, erected or acquired by the Department of General
    15  Services, its successors or assigns, of the Department of
    16  Corrections, notwithstanding any zoning ordinance, land use
    17  ordinance, building code or other regulation adopted or enacted
    18  by a political subdivision under the authority of any statute or
    19  under the authority of any home rule charter authorized and
    20  adopted under any statute or the Constitution of Pennsylvania.
    21     (c)  Preemption of local ordinances for 2001-2002 projects.--
    22  The capital projects in the category of public improvement
    23  projects specifically itemized for the Department of Corrections
    24  in section 3(4)(xi)(A) of the act of October 30, 2002 (P.L.891,
    25  No.131), known as the Capital Budget Project Itemization Act of
    26  2001-2002, are hereby authorized to be constructed, erected or
    27  acquired by the Department of General Services, its successors
    28  or assigns, of the Department of Corrections, notwithstanding
    29  any zoning ordinance, land use ordinance, building code or other
    30  regulation adopted or enacted by a political subdivision under
    20070H1589B2181                 - 127 -    

     1  the authority of any statute or under the authority of any home
     2  rule charter authorized and adopted under any statute or the
     3  Constitution of Pennsylvania.
     4  Section 19.  Special contract provisions for Department of
     5                 Corrections projects.
     6     The Department of General Services shall use the competitive
     7  sealed proposal method of source selection to enter into a
     8  design/build contract for the projects which are authorized in
     9  section 3(4)(i), (iii), (vi), (viii), (ix), (x)(B), (xi)(B),
    10  (xii)(B), (xiii), (xiv), (xv) and section 7(1). Notwithstanding
    11  the provisions of 62 Pa.C.S. § 322(6) (relating to specific
    12  construction powers, duties and procedures), the Department of
    13  General Services, upon approval of the Secretary of the Budget,
    14  may comply with the provisions of the act of May 1, 1913
    15  (P.L.155, No.104), referred to as the Separations Act, by
    16  entering into a design/build contract which requires that the
    17  design/build contractor comply with the requirements of the
    18  Separations Act. Any Department of Corrections project which is
    19  authorized in section 3(4)(i), (iii), (vi), (viii), (ix),
    20  (x)(B), (xi)(B), (xii)(B), (xiii), (xiv), (xv) or section 7(1)
    21  shall be exempt from the provisions of the act of March 3, 1978
    22  (P.L.6, No.3), known as the Steel Products Procurement Act. The
    23  Secretary of the Budget shall give notification of any such
    24  design/build contracts to the chairman and minority chairman of
    25  the Appropriations Committee of the Senate and the chairman and
    26  minority chairman of the Appropriations Committee of the House
    27  of Representatives ten days prior to advertising for a
    28  developer. Any Department of Corrections public improvement
    29  project-eligible expenditure of funds incurred prior to the
    30  effective date of this act which is directly related to a
    20070H1589B2181                 - 128 -    

     1  project improvement capital project itemized in section 3(4)(i),
     2  (iii), (vi), (viii), (ix), (x)(B), (xi)(B), (xii)(B), (xiii),
     3  (xiv), (xv) or section 7(1) shall be considered eligible to be
     4  utilized as a portion of the expenditure of funds and may be
     5  considered as eligible for reimbursement from capital funds for
     6  a project improvement capital project itemized in section
     7  3(4)(i), (iii), (vi), (viii), (ix), (x)(B), (xi)(B), (xii)(B),
     8  (xiii), (xiv), (xv) or section 7(1).
     9  Section 20.  Special contract provisions for Department of
    10                 Conservation and Natural Resources projects.
    11     Any Department of Conservation and Natural Resources public
    12  improvement project-eligible expenditure of funds incurred prior
    13  to the effective date of this act which is directly related to a
    14  project improvement capital project itemized in section
    15  3(3)(xxi) shall be considered eligible to be utilized as a
    16  portion of the expenditure of funds and may be considered as
    17  eligible for reimbursement from capital funds for a project
    18  improvement capital project itemized in section 3(3)(xxi).
    19  Section 21.  Editorial changes.
    20     In editing and preparing this act for printing following the
    21  final enactment, the Legislative Reference Bureau shall insert
    22  or revise letters or numbers for projects where the letters or
    23  numbers are missing or require revision. The bureau shall also
    24  revise the total monetary amounts for the total authorization,
    25  debt authorization, appropriations and departmental totals as
    26  necessary to agree with the total monetary amounts of the
    27  projects.
    28  Section 22.  Effective date.
    29     This act shall take effect July 1, 2007, or immediately,
    30  whichever is later.
    D9L72RZ/20070H1589B2181         - 129 -