PRIOR PRINTER'S NO. 1970 PRINTER'S NO. 2107
No. 1589 Session of 2007
INTRODUCED BY D. EVANS, JUNE 18, 2007
AS RE-REPORTED FROM COMMITTEE ON APPROPRIATIONS, HOUSE OF REPRESENTATIVES, AS AMENDED, JUNE 26, 2007
AN ACT 1 Providing for the capital budget for the fiscal year 2007-2008; 2 itemizing public improvement projects, furniture and 3 equipment projects, transportation assistance projects, 4 redevelopment assistance capital projects, flood control 5 projects, Keystone Recreation, Park and Conservation Fund 6 projects, Environmental Stewardship Fund projects, Motor 7 License Fund projects, State forestry bridge projects, 8 MANUFACTURING FUND PROJECTS and federally funded projects to <-- 9 be constructed or acquired or assisted by the Department of 10 General Services, the Department of Community and Economic 11 Development, the Department of Conservation and Natural 12 Resources, the Department of Environmental Protection and the 13 Department of Transportation, together with their estimated 14 financial costs; authorizing the incurring of debt without 15 the approval of the electors for the purpose of financing the 16 projects to be constructed, acquired or assisted by the 17 Department of General Services, the Department of Community 18 and Economic Development, the Department of Conservation and 19 Natural Resources, the Department of Environmental Protection 20 or the Department of Transportation; stating the estimated 21 useful life of the projects; providing an exemption; 22 providing for limitation on certain capital projects, for 23 special provisions for certain redevelopment assistance 24 capital projects and for preemption of local ordinances for 25 Department of Corrections projects; and making 26 appropriations. 27 The General Assembly of the Commonwealth of Pennsylvania 28 hereby enacts as follows: 29 Section 1. Short title.
1 This act shall be known and may be cited as the Capital 2 Budget Project Itemization Act of 2007-2008. 3 Section 2. Total authorizations. 4 (a) Public improvements.--The total authorization for the 5 additional capital projects in the category of public 6 improvement projects itemized in section 3 and to be acquired or 7 constructed by the Department of General Services, its 8 successors or assigns and to be financed by the incurring of 9 debt shall be $1,122,566,000 $1,295,541,000. <-- 10 (b) Furniture and equipment.--The total authorization for 11 the additional capital projects in the category of public 12 improvement projects consisting of the acquisition of original 13 movable furniture and equipment to complete public improvement 14 projects itemized in section 4 and to be acquired by the 15 Department of General Services, its successors or assigns and to 16 be financed by the incurring of debt shall be $64,846,000 <-- 17 $81,346,000. <-- 18 (c) Transportation assistance.--The total authorization for 19 the capital projects in the category of transportation 20 assistance projects itemized in section 5 with respect to which 21 an interest is to be acquired in or constructed by the 22 Department of Transportation, its successors or assigns and to 23 be financed by the incurring of debt shall be $47,148,000 <-- 24 $414,718,000. <-- 25 (d) (Reserved). <-- 26 (D) REDEVELOPMENT ASSISTANCE.--THE TOTAL AUTHORIZATION FOR <-- 27 THE ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF REDEVELOPMENT 28 ASSISTANCE AND REDEVELOPMENT ASSISTANCE CAPITAL PROJECTS 29 ITEMIZED IN SECTION 6 FOR CAPITAL GRANTS BY THE DEPARTMENT OF 30 COMMUNITY AND ECONOMIC DEVELOPMENT, ITS SUCCESSORS OR ASSIGNS 20070H1589B2107 - 2 -
1 AND TO BE FINANCED BY THE INCURRING OF DEBT SHALL BE 2 $1,313,008,000. 3 (e) Flood control.--The total authorization for the capital 4 projects in the category of flood control projects itemized in 5 section 7 and to be constructed by the Department of 6 Environmental Protection, its successors or assigns, and to be 7 financed by the incurring of debt, shall be $4,350,000. 8 (f) Keystone Recreation, Park and Conservation Fund.--The 9 total authorization for the capital projects in the category of 10 public improvement projects itemized in section 8 and to be 11 constructed by the Department of Conservation and Natural 12 Resources, its successors or assigns and to be financed from 13 current revenues in the Keystone Recreation, Park and 14 Conservation Fund shall $28,613,000. 15 (g) Environmental Stewardship Fund projects.--The total 16 authorization for the capital projects in the category of public 17 improvement projects itemized in section 9 and to be constructed 18 by the Department of Conservation and Natural Resources, its 19 successors or assigns and to be financed from current revenues 20 in the Environmental Stewardship Fund shall be $142,255,000. 21 (h) State forestry bridge projects.--The total authorization 22 for the capital projects itemized in section 10 to be 23 constructed by the Department of Conservation and Natural 24 Resources, its successors or assigns and to be financed by oil 25 company franchise tax revenues pursuant to 75 Pa.C.S. § 26 9502(a)(2)(iv) (relating to imposition of tax) shall be 27 $8,300,000. 28 (i) General Fund current revenue projects.--The total 29 authorization for the capital projects in the category of public 30 improvement projects itemized in section 11 and to be developed 20070H1589B2107 - 3 -
1 or constructed by the Department of General Services, its
2 successors or assigns and to be financed from current revenues
3 in the General Fund shall be $8,100,000 $26,100,000. <--
4 (J) MANUFACTURING FUND CURRENT REVENUE PROJECTS.--THE TOTAL <--
5 AUTHORIZATION FOR THE CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC
6 IMPROVEMENT PROJECTS ITEMIZED IN SECTION 12 AND TO BE
7 CONSTRUCTED BY THE DEPARTMENT OF GENERAL SERVICES, ITS
8 SUCCESSORS OR ASSIGNS, AND TO BE FINANCED FROM CURRENT REVENUES
9 IN THE MANUFACTURING FUND SHALL BE $3,000,000.
10 Section 3. Itemization of public improvement capital projects.
11 Additional capital projects in the category of public
12 improvement projects to be constructed or acquired by the
13 Department of General Services, its successors or assigns, and
14 to be financed by the incurring of debt, are hereby itemized,
15 together with their respective estimated financial costs, as
16 follows:
17 Total
18 Project
19 Project Allocation
20 (1) Office of Administration
21 (i) Statewide mobile radio and microwave
22 system
23 (A) Additional funds for DGS project 950-
24 10, Statewide mobile radio and
25 microwave system 36,100,000
26 (Base Project Allocation - $36,100,000)
27 (2) Department of Agriculture
28 (i) Health Diagnostic Laboratory
29 (A) Construct a new Pennsylvania Animal
30 Health Diagnostic Laboratory (PADLS)
20070H1589B2107 - 4 -
1 with Bio-Safety Level-3 capabilities to 2 support PADLS 33,000,000 3 (Base Project Allocation - $29,700,000) 4 (Design and Contingencies - $3,300,000) 5 (ii) State Dairy Farm 6 (A) Rehabilitate and construct several 7 support facilities for State dairy farm 8 to complement existing dairy operation 500,000 9 (Base Project Allocation - $450,000) 10 (Design and Contingencies - $50,000) 11 (3) Department of Conservation and Natural 12 Resources 13 (i) Bald Eagle State Park 14 (A) Rehabilitate and develop a family 15 campground at the State park including 16 infrastructure 2,000,000 17 (Base Project Allocation - $2,000,000) 18 (ii) Chester County 19 (A) Acquire the Strawbridge Property lands 20 in Chester County 4,000,000 21 (Land Allocation - $4,000,000) 22 (iii) Clear Creek State Park 23 (A) Construct new maintenance facility 24 including infrastructure 1,800,000 25 (Base Project Allocation - $1,800,000) 26 (iv) Cook Forest State Park 27 (A) Replace the office/visitors' center 2,500,000 28 (Base Project Allocation - $2,000,000) 29 (Design and Contingencies - $500,000) 30 (B) Replace the pit latrines with modern 20070H1589B2107 - 5 -
1 flush facilities including 2 infrastructure 1,000,000 3 (Base Project Allocation - $800,000) 4 (Design and Contingencies - $200,000) 5 (v) Erie Bluffs State Park 6 (A) Provide for construction of the 7 initial development of 540 acre area 8 including infrastructure, roads, 9 trails, parking lots and boating 10 facilities 10,000,000 11 (Base Project Allocation - $8,000,000) 12 (Design and Contingencies - $2,000,000) 13 (vi) Forest District 3 14 (A) Rehabilitate and improve the Gunter 15 Valley Dam to return it to a safe 16 condition and in compliance with 17 current requirements 7,000,000 18 (Base Project Allocation - $5,600,000) 19 (Design and Contingencies - $1,400,000) 20 (vii) Forest District 4 21 (A) Repair and repave roads including 22 returning a portion back to a gravel 23 road 5,000,000 24 (Base Project Allocation - $4,000,000) 25 (Design and Contingencies - $1,000,000) 26 (viii) Forest District 7 27 (A) Rehabilitate roadways throughout the 28 forest to ensure safety and to provide 29 public access for outdoor activities 3,000,000 30 (Base Project Allocation - $2,400,000) 20070H1589B2107 - 6 -
1 (Design and Contingencies - $600,000) 2 (ix) Forest District 9 3 (A) Rehabilitate roadways throughout the 4 forest to ensure safety and to provide 5 public access for outdoor activities 3,000,000 6 (Base Project Allocation - $2,400,000) 7 (Design and Contingencies - $600,000) 8 (x) Forest District 10 9 (A) Rehabilitate roadways throughout the 10 forest to ensure safety and to provide 11 public access for outdoor activities 3,000,000 12 (Base Project Allocation - $2,400,000) 13 (Design and Contingencies - $600,000) 14 (xi) Forest District 12 15 (A) Rehabilitate roadways throughout the 16 forest to ensure safety and to provide 17 public access for outdoor activities 3,000,000 18 (Base Project Allocation - $2,400,000) 19 (Design and Contingencies - $600,000) 20 (xii) Forest District 13 21 (A) Rehabilitate roadways throughout the 22 forest to ensure safety and to provide 23 public access for outdoor activities 3,000,000 24 (Base Project Allocation - $2,400,000) 25 (Design and Contingencies - $600,000) 26 (xiii) Forest District 15 27 (A) Rehabilitate roadways throughout the 28 forest to ensure safety and to provide 29 public access for outdoor activities 3,000,000 30 (Base Project Allocation - $2,400,000) 20070H1589B2107 - 7 -
1 (Design and Contingencies - $600,000) 2 (xiv) Forest District 16 3 (A) Rehabilitate roadways throughout the 4 forest to ensure safety and to provide 5 public access for outdoor activities 3,000,000 6 (Base Project Allocation - $2,400,000) 7 (Design and Contingencies - $600,000) 8 (xv) Forest District 20 9 (A) Rehabilitate roadways throughout the 10 forest to ensure safety and to provide 11 public access for outdoor activities 3,000,000 12 (Base Project Allocation - $2,400,000) 13 (Design and Contingencies - $600,000) 14 (B) Rehabilitate rest facilities, parking 15 lots and multiple use trails and 16 refurbish living quarters as a 17 departmental training facility with 18 necessary equipment 2,500,000 19 (Base Project Allocation - $2,000,000) 20 (Design and Contingencies - $500,000) 21 (xvi) Gouldsboro State Park 22 (A) Rehabilitate day use area and provide 23 for the replacement of lifeguard 24 building, bathhouse, boat rental 25 building and comfort station including 26 infrastructure 2,500,000 27 (Base Project Allocation - $2,000,000) 28 (Design and Contingencies - $500,000) 29 (xvii) Lehigh Gorge State Park 30 (A) Provide for the acquisition of land 20070H1589B2107 - 8 -
1 necessary to complete the scheme for 2 the park in conformance with Statewide 3 recreation plan 3,500,000 4 (Land Allocation - $3,500,000) 5 (xviii) Montgomery County 6 (A) Acquire the Erdenheim Farm lands in 7 Montgomery County 4,000,000 8 (Land Allocation -$4,000,000) 9 (xix) Nescopeck State Park 10 (A) Develop day use area and provide for 11 the development of recreational and 12 educational facilities for day use 3,000,000 13 (Base Project Allocation - $2,500,000) 14 (Design and Contingencies - $500,000) 15 (xx) Promised Land State Park 16 (A) Rehabilitate and improve lower lake 17 dam to return it to a safe condition 18 and in compliance with current 19 requirements 3,500,000 20 (Base Project Allocation - $2,800,000) 21 (Design and Contingencies - $700,000) 22 (xxi) Quehanna Wild Area 23 (A) Provide for the remediation of land of 24 radioactive materials within the 25 Quehanna wild area at the former 26 nuclear reactor site 2,500,000 27 (Base Project Allocation - $2,500,000) 28 (B) Facilitate the cleanup and reclamation 29 of the Quehanna reactor site at 30 Moshannon State Forest 1,834,000 20070H1589B2107 - 9 -
1 (Base Project Allocation - $1,834,000) 2 (xxii) Ricketts Glen State Park 3 (A) Repair and repave roads including 4 returning a portion back to a gravel 5 road 3,500,000 6 (Base Project Allocation - $2,800,000) 7 (Design and Contingencies - $700,000) 8 (xxiii) S.B. Elliott State Park 9 (A) Additional funding to complete the 10 visitors' center and overnight lodging 11 including furnishings and equipment 3,500,000 12 (Base Project Allocation - $3,500,000) 13 (xxiv) Shikellamy State Park 14 (A) Rehabilitate marina damaged by flood 15 waters in 2005 and 2006 including new 16 docks, railings, concrete bulkheads and 17 courtesy docks 1,500,000 18 (Base Project Allocation - $1,200,000) 19 (Design and Contingencies - $300,000) 20 (4) Department of Corrections 21 (i) State Correctional Institution at 22 Cambridge Springs 23 (A) Construct a new 128-cell L-3 close 24 security housing unit with 230-bed 25 capacity with infrastructure upgrade 13,500,000 <-- 26 (Base Project Allocation - $10,800,000) 27 (Design and Contingencies - $2,700,000) 28 CAPACITY WITH INFRASTRUCTURE UPGRADE 16,800,000 <-- 29 (BASE PROJECT ALLOCATION - $13,500,000) 30 (DESIGN AND CONTINGENCIES - $3,300,000) 20070H1589B2107 - 10 -
1 (ii) State Correctional Institution at Camp 2 Hill 3 (A) Additional funds for DGS project 573- 4 26, replacement of Group 1 plumbing 5 components 8,000,000 6 (Base Project Allocation - $6,400,000) 7 (Design and Contingencies - $1,600,000) 8 (B) Additional funds for DGS project 573- 9 27, provide additional funding for 10 Phase 2 to complete the plumbing 11 repairs started under project 573-27 6,000,000 <-- 12 REPAIRS STARTED UNDER PROJECTS 573-27 <-- 13 TO INCLUDE STEAM PIPE REPLACEMENT AND 14 REPAIRS TO PIPE TUNNELS 6,000,000 15 (Base Project Allocation - $4,800,000) 16 (Design and Contingencies - $1,200,000) 17 (iii) State Correctional Institution at Coal 18 Township 19 (A) Construct a new 128-cell L-3 close 20 security housing unit with 230-bed 21 capacity with infrastructure upgrade 13,500,000 <-- 22 (Base Project Allocation - $10,800,000) 23 (Design and Contingencies - $2,700,000) 24 CAPACITY WITH INFRASTRUCTURE UPGRADE 14,500,000 <-- 25 (BASE PROJECT ALLOCATION - $11,600,000) 26 (DESIGN AND CONTINGENCIES - $2,900,000) 27 (iv) State Correctional Institution at Cresson 28 (A) Renovate and upgrade the heating and 29 air conditioning system serving the 30 medical building 550,000 20070H1589B2107 - 11 -
1 (Base Project Allocation - $440,000) 2 (Design and Contingencies - $110,000) 3 (v) State Correctional Institution at Dallas <-- 4 (A) Construct a new 2,300-bed L-3 Medium 5 Security prison on the grounds of SCI 6 Dallas 7 including infrastructure and road work 8 to incorporate the two facilities at 9 this site 189,000,000 10 (Base Project Allocation - 11 $151,200,000) 12 (Design and Contingencies - 13 $37,800,000) 14 (V) (RESERVED) <-- 15 (vi) State Correctional Institution at Forest 16 (A) Construct a new 128-cell L-5 close 17 security housing unit with 18 infrastructure upgrade 15,500,000 <-- 19 (Base Project Allocation - $12,400,000) 20 (Design and Contingencies - $3,100,000) 21 CAPACITY WITH INFRASTRUCTURE UPGRADE 16,500,000 <-- 22 (BASE PROJECT ALLOCATION - $13,200,000) 23 (DESIGN AND CONTINGENCIES - $3,300,000) 24 (vii) State Correctional Institution at 25 Frackville 26 (A) Replace and upgrade the institution's 27 main electrical switchgear 520,000 28 (Base Project Allocation - $416,000) 29 (Design and Contingencies - $104,000) 30 (viii) State Correctional Institution at <-- 20070H1589B2107 - 12 -
1 Huntingdon 2 (A) Construct a new 2,000-bed L-3 medium 3 security prison on the grounds of SCI 4 Huntingdon including infrastructure 5 and road work to incorporate the two 6 facilities at this site 175,000,000 7 (Base Project Allocation - 8 $140,000,000) 9 (Design and Contingencies - 10 $35,000,000) 11 (ix) State Correctional Institution at Laurel 12 Highlands 13 (A) Replace roofs on dietary building No. 14 4 and housing unit building C 800,000 15 (Base Project Allocation - $640,000) 16 (Design and Contingencies - $160,000) 17 (x) State Regional Correctional Facility at 18 Mercer 19 (A) Replace roofs on Medical Building, M 20 Block and G Block 650,000 21 (Base Project Allocation - $520,000) 22 (Design and Contingencies - $130,000) 23 (xi) State Correctional Institution at Muncy 24 (A) Replace roofs on administration, 25 laundry, storeroom and kitchen 26 buildings and housing units A Block, M 27 Block, K Block and F Block 2,300,000 28 (Base Project Allocation - $1,840,000) 29 (Design and Contingencies - $460,000) 30 (xii) State Correctional Institution at Pine 20070H1589B2107 - 13 -
1 Grove 2 (A) Construct a new 128-cell L-3 close 3 security housing unit with 230-bed 4 capacity with infrastructure upgrade 13,500,000 5 (Base Project Allocation - $10,800,000) 6 (Design and Contingencies - $2,700,000) 7 (xiii) State Correctional Institution at 8 Rockview 9 (A) Construct a new 2,000-bed L-3 Medium 10 Security prison on the grounds of SCI 11 Rockview including infrastructure and 12 road work to incorporate the two 13 facilities at this site 175,000,000 14 (Base Project Allocation - 15 $140,000,000) 16 (Design and Contingencies - 17 $35,000,000) 18 (VIII) STATE CORRECTIONAL INSTITUTION AT <-- 19 GRATERFORD 20 (A) CONSTRUCT A NEW 2,000 BED L-3 MEDIUM 21 SECURITY PRISON ON THE GROUNDS OF SCI 22 GRATERFORD INCLUDING 23 INFRASTRUCTURE AND ROAD WORK TO 24 INCORPORATE THE TWO FACILITIES AT THIS 25 SITE 200,000,000 26 (BASE PROJECT ALLOCATION - 27 $160,000,000) 28 (DESIGN AND CONTINGENCIES - 29 $40,000,000) 30 (IX) STATE CORRECTIONAL INSTITUTION AT 20070H1589B2107 - 14 -
1 HUNTINGDON 2 (A) CONSTRUCT A NEW 2,000 BED L-3 MEDIUM 3 SECURITY PRISON ON THE GROUNDS OF SCI 4 HUNTINGDON INCLUDING INFRASTRUCTURE 5 AND ROAD WORK TO INCORPORATE THE TWO 6 FACILITIES AT THIS SITE 200,000,000 7 (BASE PROJECT ALLOCATION - 8 $160,000,000) 9 (DESIGN AND CONTINGENCIES - 10 $40,000,000) 11 (X) STATE CORRECTIONAL INSTITUTION AT LAUREL 12 HIGHLANDS 13 (A) REPLACE ROOFS ON DIETARY BUILDING NO.4 14 AND HOUSING UNIT BUILDING C 800,000 15 (BASE PROJECT ALLOCATION - $640,000) 16 (DESIGN AND CONTINGENCIES - $160,000) 17 (B) ADDITIONAL FUNDS FOR DGS PROJECT 376- 18 5, CONSTRUCT A NEW 230-BED CAPACITY 19 FACILITY AND UPGRADE INFRASTRUCTURE AND 20 SECURITY 1,500,000 21 (BASE PROJECT ALLOCATION - $1,200,000) 22 (DESIGN AND CONTINGENCIES - $300,000) 23 (XI) STATE CORRECTIONAL INSTITUTION AT MERCER 24 (A) REPLACE ROOFS ON MEDICAL BUILDING, M 25 BLOCK AND G BLOCK 650,000 26 (BASE PROJECT ALLOCATION - $520,000) 27 (DESIGN AND CONTINGENCIES - $130,000) 28 (B) ADDITIONAL FUNDS FOR DGS PROJECT 1572- 29 10, CONSTRUCT A NEW 230-BED CAPACITY 30 FACILITY AND UPGRADE INFRASTRUCTURE AND 20070H1589B2107 - 15 -
1 SECURITY 4,000,000 2 (BASE PROJECT ALLOCATION - $3,200,000) 3 (DESIGN AND CONTINGENCIES - $800,000) 4 (XII) STATE CORRECTIONAL INSTITUTION AT MUNCY 5 (A) REPLACE ROOFS ON ADMINISTRATION 6 BUILDING, LAUNDRY BUILDING, STOREROOM 7 BUILDING, KITCHEN BUILDING, AND HOUSING 8 UNITS A BLOCK, M BLOCK, K BLOCK AND F 9 BLOCK 2,300,000 10 (BASE PROJECT ALLOCATION - $1,840,000) 11 (DESIGN AND CONTINGENCIES - $460,000) 12 (B) ADDITIONAL FUNDS FOR DGS PROJECT 574- 13 26, ADDITION OF TWO NEW CELL BLOCKS FOR 14 CLOSE SECURITY, EXPANSION OF INFIRMARY, 15 OUTSIDE WAREHOUSE, ELECTRICAL AND 16 BOILER UPGRADES; ALSO INCLUDING FUNDS 17 FOR UTILITY UPGRADES AND KITCHEN AND 18 DINING ROOM EXPANSION 7,200,000 19 (BASE PROJECT ALLOCATION - $5,800,000) 20 (DESIGN AND CONTINGENCIES - $1,400,000) 21 (XIII) STATE CORRECTIONAL INSTITUTION AT PINE 22 GROVE 23 (A) CONSTRUCT A NEW 128-CELL L-3 CLOSE 24 SECURITY HOUSING UNIT WITH 230-BED 25 CAPACITY WITH INFRASTRUCTURE UPGRADE 14,500,000 26 (BASE PROJECT ALLOCATION - $11,600,000) 27 (DESIGN AND CONTINGENCIES - $2,900,000) 28 (XIV) STATE CORRECTIONAL INSTITUTION AT 29 ROCKVIEW 30 (A) CONSTRUCT A NEW 2,000 BED L-3 MEDIUM 20070H1589B2107 - 16 -
1 SECURITY PRISON ON THE GROUNDS OF SCI 2 ROCKVIEW INCLUDING 3 INFRASTRUCTURE AND ROAD WORK TO 4 COMPLETE THE TWO FACILITIES AT THIS 5 SITE 200,000,000 6 (BASE PROJECT ALLOCATION - 7 $160,000,000) 8 (DESIGN AND CONTINGENCIES - 9 $40,000,000) 10 (XV) STATE CORRECTIONAL INSTITUTION AT 11 SMITHFIELD 12 (A) ADDITIONAL FUNDS FOR DGS PROJECT 1573- 13 7, EXPAND KITCHEN/DINING FACILITY 2,500,000 14 (BASE PROJECT ALLOCATION - $2,000,000) 15 (DESIGN AND CONTINGENCIES - $500,000) 16 (B) ADDITIONAL FUNDS FOR DGS PROJECT 1573- 17 9, CONSTRUCT A NEW 230-BED CAPACITY 18 FACILITY AND UPGRADE INFRASTRUCTURE AND 19 SECURITY 4,000,000 20 (BASE PROJECT ALLOCATION - $3,200,000) 21 (DESIGN AND CONTINGENCIES - $800,000) 22 (5) Department of Education 23 (i) Scranton State School for the Deaf 24 (A) Provide improvements and upgrades to 25 the emergency, mechanical and 26 electrical systems throughout the 27 campus 7,560,000 28 (Base Project Allocation - $6,574,000) 29 (Design and Contingencies - $986,000) 30 (ii) Pennsylvania State University 20070H1589B2107 - 17 -
1 (A) Provide for the capital renewal for
2 campuses in the eastern region of the
3 university including code compliances
4 and infrastructure upgrades 7,000,000
5 (Base Project Allocation - $7,000,000)
6 (B) Provide for the capital renewal for
7 campuses in the central region of the
8 university including code compliances
9 and infrastructure upgrades 7,000,000
10 (Base Project Allocation - $7,000,000)
11 (C) Provide for the capital renewal for
12 campuses in the western region of the
13 university including code compliances
14 and infrastructure upgrades 7,000,000
15 (Base Project Allocation - $7,000,000)
16 (III) UNIVERSITY OF PENNSYLVANIA <--
17 (A) CONSTRUCTION OF A CENTER FOR
18 NANOTECHNOLOGY RESEARCH AND
19 DEVELOPMENT 30,000,000
20 (BASE PROJECT ALLOCATION - $30,000,000)
21 (B) CONSTRUCTION OF A NEW LIFE SCIENCES
22 BUILDING 16,000,000
23 (BASE PROJECT ALLOCATION - $16,000,000)
24 (iii) (IV) University of Pittsburgh <--
25 (A) Providing for upgrades and deferred
26 maintenance needs on all campuses 20,000,000
27 (Base Project Allocation - $16,667,000)
28 (Design and Contingencies - $3,333,000)
29 (B) CONSTRUCTION AND OTHER RELATED COSTS <--
30 FOR THE RENOVATION OF THE MANUFACTURING
20070H1589B2107 - 18 -
1 ASSISTANCE CENTER 375,000
2 (iv) (V) Lincoln University <--
3 (A) Renovate Langston Hughes Library and
4 correct problems from structural design
5 flaws 7,000,000
6 (Base Project Allocation - $5,600,000)
7 (Design and Contingencies - $1,400,000)
8 (B) Renovate Wright Hall building systems,
9 classrooms and laboratory including ADA
10 requirements 4,000,000
11 (Base Project Allocation - $3,200,000)
12 (Design and Contingencies - $800,000)
13 (VI) LUZERNE COUNTY COMMUNITY COLLEGE <--
14 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER
15 RELATED COSTS FOR A PUBLIC SAFETY
16 INSTITUTE 1,000,000
17 (B) ACQUISITION, CONSTRUCTION,
18 INFRASTRUCTURE AND OTHER RELATED COSTS
19 FOR STUDENT HOUSING 2,000,000
20 (C) ACQUISITION, CONSTRUCTION,
21 INFRASTRUCTURE AND OTHER RELATED COSTS
22 FOR A NEW CULINARY ARTS BUILDING WITH
23 PARKING 3,000,000
24 (VII) THADDEUS STEVENS COLLEGE OF TECHNOLOGY
25 (A) CONSTRUCTION AND OTHER RELATED COSTS
26 FOR THE THADDEUS STEVENS TECHNOLOGY
27 CENTER 4,000,000
28 (VIII) WESTMORELAND COMMUNITY COLLEGE
29 (A) CONSTRUCTION AND OTHER RELATED COSTS
30 FOR ALLE-KISKI EDUCATION CENTER 2,500,000
20070H1589B2107 - 19 -
1 (IX) YORK COMMUNITY COLLEGE 2 (A) ACQUISITION, CONSTRUCTION, 3 INFRASTRUCTURE AND OTHER RELATED COSTS 4 FOR DOWNTOWN YORK COMMUNITY COLLEGE 5 CAMPUS 7,000,000 6 (6) Department of Environmental Protection 7 (I) BUCKS COUNTY <-- 8 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 9 RELATED COSTS FOR BRISTOL BOROUGH FLOOD 10 PROTECTION PROJECT 3,000,000 11 (i) (II) Cambria County <-- 12 (A) Additional funds for Patton Flood 13 Project to the upstream section and 14 remove existing levee in the downstream 15 section 3,600,000 16 (Base Project Allocation - $3,000,000) 17 (Design and Contingencies - $600,000) 18 (B) Construct Lancashire No.15 acid mine 19 drainage treatment plant to improve an 20 estimated 25 miles of the west branch 21 of the Susquehanna River 10,025,000 22 (Base Project Allocation - $10,025,000) 23 (III) CLEARFIELD COUNTY <-- 24 (A) CONSTRUCTION AND OTHER RELATED COSTS 25 FOR STREAM CHANNEL CLEARING AND 26 RESTORATION IN CURWENSVILLE BOROUGH 5,000,000 27 (ii) (IV) Clearfield and/or Cambria County <-- 28 (A) Construct active acid mine drainage 29 facility for currently untreated mine 30 pool discharge in the Susquehanna River 20070H1589B2107 - 20 -
1 basin to offset agricultural 2 consumptive use demands 6,000,000 3 (Base Project Allocation - $6,000,000) 4 (iii) (V) Clearfield and Elk Counties <-- 5 (A) Construct active acid mine drainage 6 facility near the Village of Hollywood, 7 Huston Township, Clearfield County, to 8 restore water quality in the Bennett 9 Branch Sinnemahoning Creek in support 10 of the PA Wilds initiative 12,125,000 11 (Base Project Allocation - $12,125,000) 12 (VI) DELAWARE COUNTY <-- 13 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 14 RELATED COSTS FOR EDGEMOUNT SQUARE IN 15 NEWTOWN TOWNSHIP - STORMWATER 16 MANAGEMENT PROJECT 300,000 17 (B) CONSTRUCTION, INFRASTRUCTURE AND OTHER 18 RELATED COSTS FOR THE RADNOR MIDDLE 19 SCHOOL STORMWATER MANAGEMENT PROJECT 300,000 20 (C) CONSTRUCTION, INFRASTRUCTURE AND OTHER 21 RELATED COSTS FOR STORMWATER MANAGEMENT 22 IN RIDLEY TOWNSHIP 500,000 23 (iv) (VII) Fulton County <-- 24 (A) Reconstruct two streams currently 25 flowing into abandoned surface mine 26 pits in order to restore the natural 27 stream flow to the Great Trough Creek 2,000,000 28 (Base Project Allocation - $2,000,000) 29 (VIII) GREENE COUNTY <-- 30 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 20070H1589B2107 - 21 -
1 RELATED COSTS FOR WISECARVER DAM 2 REHABILITATION IN FRANKLIN TOWNSHIP 1,500,000 3 (v) (IX) Indiana County <-- 4 (A) Construct active acid mine drainage 5 facility near the abandoned Wehrum 6 shaft to treat discharges from two 7 abandoned mine complexes discharging to 8 Blacklick Creek 6,000,000 9 (Base Project Allocation - $6,000,000) 10 (vi) (X) Luzerne County <-- 11 (A) Additional funds for DGS Project 184- 12 23, flood control project on Mill 13 Creek, Avoca Borough 1,200,000 14 (Base Project Allocation - $1,000,000) 15 (Design and Contingencies - $200,000) 16 (B) CONSTRUCTION AND OTHER COSTS RELATED <-- 17 TO REPAIR AND IMPROVE WADE RUN IN 18 SWOYERSVILLE BOROUGH 500,000 19 (C) CONSTRUCTION, INFRASTRUCTURE AND OTHER 20 RELATED COSTS FOR THE ASHLEY SOLOMON 21 CREEK TUNNEL PROJECT 750,000 22 (XI) MONTGOMERY COUNTY 23 (A) CONSTRUCTION AND OTHER RELATED COSTS 24 FOR THE ARDSLEY DRAINAGE PROJECT IN 25 UPPER DUBLIN TOWNSHIP 2,000,000 26 (7) Department of General Services 27 (i) Dauphin County 28 (A) Provide for steam plant replacements 29 and upgrades in Capitol Annex 1,563,000 30 (Base Project Allocation - $1,250,000) 20070H1589B2107 - 22 -
1 (Design and Contingencies - $313,000) 2 (B) Provide for remediation of mold, 3 asbestos and other hazmat in buildings 4 and equipment areas in Capitol Annex 5,625,000 5 (Base Project Allocation - $4,500,000) 6 (Design and Contingencies - $1,125,000) 7 (C) Upgrade building heating system and 8 install new air conditioning system in 9 Capitol Annex 3,750,000 10 (Base Project Allocation - $3,000,000) 11 (Design and Contingencies - $750,000) 12 (D) Replace main Capitol Complex 13 Substation switchgears including 14 control status board along with 15 transformers and circuit breakers 25,000,000 16 (Base Project Allocation - $20,000,000) 17 (Design and Contingencies - $5,000,000) 18 (E) Replace existing 15kv distribution 19 feeders throughout the Capitol Complex 20 and reset the system primary and 21 secondary circuit breakers for proper 22 overall system coordination 10,625,000 23 (Base Project Allocation - $8,500,000) 24 (Design and Contingencies - $2,125,000) 25 (F) Refurbish Capital Park by providing 26 for a new retaining wall along Walnut 27 Street including new grading and 28 installation of a water conduction 29 system 1,000,000 30 (Base Project Allocation - $750,000) 20070H1589B2107 - 23 -
1 (Design and Contingencies - $250,000) 2 (G) Replace all cloth ceilings in halls of 3 the Capitol East Wing 1,000,000 4 (Base Project Allocation - $750,000) 5 (Design and Contingencies - $250,000) 6 (H) Replace existing macadam with new 7 covering and sealant to prevent water 8 leakage and replace drains and piping 9 at the parking facility at 22nd and 10 Forster Streets, Harrisburg 1,100,000 11 (Base Project Allocation - $880,000) 12 (Design and Contingencies - $220,000) 13 (I) Repair the roof membrane and replace 14 broken pavers at the Rachel Carson 15 State Office Building 750,000 16 (Base Project Allocation - $600,000) 17 (Design and Contingencies - $150,000) 18 (8) Pennsylvania Historical and Museum Commission 19 (i) Daniel Boone Homestead 20 (A) Provide for site improvements and 21 restore the boyhood home of Daniel 22 Boone 960,000 23 (Base Project Allocation - $800,000) 24 (Design and Contingencies - $160,000) 25 (ii) Landis Valley Museum 26 (A) Provide for the design and 27 construction of a new maintenance 28 building 960,000 29 (Base Project Allocation - $800,000) 30 (Design and Contingencies - $160,000) 20070H1589B2107 - 24 -
1 (iii) Pennsbury Manor 2 (A) Rehabilitate up to 23 buildings and 3 site development of infrastructure 4 throughout the site 1,920,000 5 (Base Project Allocation - $1,600,000) 6 (Design and Contingencies - $320,000) 7 (iv) Pennsylvania Lumber Museum 8 (A) Reconfigure entrance to the building 9 to permit one coordinated exhibit 10 gallery rather than two disjointed 11 galleries 2,400,000 12 (Base Project Allocation - $2,000,000) 13 (Design and Contingencies - $400,000) 14 (9) Department of Military and Veterans Affairs 15 (i) Pittsburgh Hunt Readiness Center, 16 Allegheny County 17 (A) Rehabilitate readiness center 18 including assembly hall, classrooms, 19 administrative offices, storage spaces, 20 restrooms, locker rooms and mechanical 21 rooms 3,000,000 22 (Base Project Allocation - $2,400,000) 23 (Design and Contingencies - $600,000) 24 (ii) Southwestern Veterans Center, Allegheny 25 County 26 (A) Replace sewer main 331,000 27 (Base Project Allocation - $248,000) 28 (Design and Contingencies - $83,000) 29 (iii) Hollidaysburg Veterans Home, Blair 30 County 20070H1589B2107 - 25 -
1 (A) Rehabilitate fire alarm and sprinkler 2 systems in Arnold, Dietary, Eisenhower 3 and MacArthur Halls to meet life safety 4 compliance 2,722,000 5 (Base Project Allocation - $2,268,000) 6 (Design and Contingencies - $454,000) 7 (iv) Harrisburg Military Post, Dauphin County 8 (A) Rehabilitate various buildings and 9 facilities on the military post 10 including assembly halls, classrooms, 11 administrative offices, storage spaces, 12 restrooms, locker rooms, mechanical 13 rooms and expanded parking 6,000,000 14 (Base Project Allocation - $4,800,000) 15 (Design and Contingencies - $1,200,000) 16 (v) Wilkes-Barre Readiness Center, Luzerne 17 County 18 (A) Rehabilitate readiness center 19 including assembly hall, classrooms, 20 administrative offices, storage spaces, 21 restrooms, locker rooms, mechanical 22 rooms and rehabilitation and expansion 23 of parking 4,000,000 24 (Base Project Allocation - $3,200,000) 25 (Design and Contingencies - $800,000) 26 (vi) Southeastern Veterans Center, Montgomery 27 County 28 (A) Rehabilitate fire alarm and sprinkler 29 systems to meet life safety compliance 1,276,000 30 (Base Project Allocation - $1,063,000) 20070H1589B2107 - 26 -
1 (Design and Contingencies - $213,000) 2 (vii) Philadelphia Lancaster Avenue Readiness 3 Center, Philadelphia County 4 (A) Rehabilitate readiness center to 5 include assembly hall, classrooms, 6 administrative offices, storage spaces, 7 restrooms, locker rooms and mechanical 8 rooms 6,000,000 9 (Base Project Allocation - $5,000,000) 10 (Design and Contingencies - $1,000,000) 11 (viii) Philadelphia Southampton Road Armory, 12 Philadelphia County 13 (A) Replace several air handling units and 14 associated pumps and motors and install 15 new chiller with ice storage capacity 16 to be made at night that will 17 distribute cooling during the day 1,500,000 18 (Base Project Allocation - $1,300,000) 19 (Design and Contingencies - $200,000) 20 (10) Department of Public Welfare 21 (i) Allentown State Hospital 22 (A) Upgrade three coal boilers currently 23 in poor condition and replace traveling 24 grate stokers and controls 3,600,000 25 (Base Project Allocation - $3,000,000) 26 (Design and Contingencies - $600,000) 27 (ii) Clarks Summit State Hospital 28 (A) Replace the electrical distribution 29 center at the sewage treatment plant 30 and install new 400 amp service, motor 20070H1589B2107 - 27 -
1 control center, new transformer and new 2 back-up supply 1,200,000 3 (Base Project Allocation - $1,000,000) 4 (Design and Contingencies - $200,000) 5 (iii) Ebensburg Center 6 (A) Replace all roofed areas which cover 7 residential housing units 1,440,000 8 (Base Project Allocation - $1,200,000) 9 (Design and Contingencies - $240,000) 10 (B) Replace current emergency generators 11 with stand alone outside units in all 12 seven residential units 1,500,000 13 (Base Project Allocation - $1,250,000) 14 (Design and Contingencies - $250,000) 15 (iv) Loysville Youth Development Center 16 (A) Construct a modular multipurpose 17 gym/kitchen/classroom building 3,000,000 18 (Base Project Allocation - $2,500,000) 19 (Design and Contingencies - $500,000) 20 (v) Loysville Complex, South Mountain Secure 21 Treatment Unit 22 (A) Construct a modular multipurpose 23 gym/kitchen/classroom building 3,000,000 24 (Base Project Allocation - $2,500,000) 25 (Design and Contingencies - $500,000) 26 (vi) Mayview State Hospital 27 (A) Upgrade the primary electrical system 28 including all central feeder circuits 3,000,000 29 (Base Project Allocation - $2,500,000) 30 (Design and Contingencies - $500,000) 20070H1589B2107 - 28 -
1 (vii) Norristown State Hospital 2 (A) Renovate the boiler plant for building 3 60, Phase 3 of DGS project 509-29, 4 reconstruction or replacement of 5 boilers to meet emissions requirements 6 and upgrade the steam distribution 7 system 1,800,000 8 (Base Project Allocation - $1,500,000) 9 (Design and Contingencies - $300,000) 10 (viii) Polk Center 11 (A) Replace valves, backwash pump and 12 replenish filters with new media in 13 order to keep water plant in compliance 14 with regulations 1,400,000 15 (Base Project Allocation - $1,120,000) 16 (Design and Contingencies - $280,000) 17 (ix) Selinsgrove Center 18 (A) Upgrade the boiler controls for the 19 facility 600,000 20 (Base Project Allocation - $500,000) 21 (Design and Contingencies - $100,000) 22 (B) Purchase and install package boiler 23 for more efficient handling of summer 24 steam load 960,000 25 (Base Project Allocation - $800,000) 26 (Design and Contingencies - $160,000) 27 (x) South Mountain Restoration Center 28 (A) Purchase and install package boiler 29 for more efficient handling of summer 30 steam load 840,000 20070H1589B2107 - 29 -
1 (Base Project Allocation - $700,000) 2 (Design and Contingencies - $140,000) 3 (xi) Torrance State Hospital 4 (A) Bore two horizontal wells into a 5 mountainside to expand and improve 6 freshwater collection 720,000 7 (Base Project Allocation - $600,000) 8 (Design and Contingencies - $120,000) 9 (xii) Wernersville State Hospital 10 (A) Upgrade coal boiler refractory and 11 structural components 360,000 12 (Base Project Allocation - $300,000) 13 (Design and Contingencies - $60,000) 14 (xiii) White Haven Center 15 (A) Replace the heating systems in 16 residential buildings from existing old 17 radiant heat to more modern, digitally- 18 controlled, high-efficiency HVAC 19 systems 2,400,000 20 (Base Project Allocation - $2,000,000) 21 (Design and Contingencies - $400,000) 22 (11) Pennsylvania State Police 23 (i) Dunmore Headquarters, Lackawanna County 24 (A) Construct a new headquarters facility, 25 garage and hangar to replace existing 26 facilities in Lackawanna County 10,800,000 27 (Base Project Allocation - $9,000,000) 28 (Design and Contingencies - $1,800,000) 29 (12) State System of Higher Education 30 (i) Bloomsburg University of Pennsylvania 20070H1589B2107 - 30 -
1 (A) Additional funding for the renovation 2 of the Nelson Field House while 3 providing additional athletic and 4 office space 1,000,000 5 (ii) Cheyney University of Pennsylvania 6 (A) Additional funding to replace Browne 7 Hall including upgrading infrastructure 8 according to modern codes and fire 9 safety code requirements 1,000,000 10 (III) CALIFORNIA UNIVERSITY OF PENNSYLVANIA <-- 11 (A) CONSTRUCTION AND OTHER RELATED COSTS 12 TO UPGRADE UNIVERSITY STADIUM 13 FACILITIES 250,000 14 (iii) (IV) East Stroudsburg University of <-- 15 Pennsylvania 16 (A) Additional funding for the replacement 17 of Rosenkrans Hall, providing 18 additional classroom, laboratory and 19 office space 8,000,000 20 (B) CONSTRUCTION AND OTHER COSTS RELATED <-- 21 TO THE EAST STROUDSBURG UNIVERSITY 22 CONFERENCE CENTER 2,000,000 23 (C) CONSTRUCTION AND OTHER RELATED COSTS 24 TO BUILD A PARKING DECK TO SERVE EAST 25 STROUDSBURG UNIVERSITY AND POCONO 26 MEDICAL CENTER 3,500,000 27 (iv) (V) Edinboro University of Pennsylvania <-- 28 (A) Renovate or replace Ross Hall 29 including infrastructure and exterior 30 surfaces 10,000,000 20070H1589B2107 - 31 -
1 (VI) LOCK HAVEN UNIVERSITY OF PENNSYLVANIA <-- 2 (A) COSTS ASSOCIATED WITH FURNITURE AND 3 EQUIPMENT FOR A NEW INDOOR ATHLETIC 4 FACILITY 1,000,000 5 (13) Department of Transportation 6 (i) Clearfield County 7 (A) Replace or rehabilitate District 2-0 8 Office including an addition on current 9 site and infrastructure improvements 12,000,000 10 (Base Project Allocation - $10,000,000) 11 (Design and Contingencies - $2,000,000) 12 (ii) Dauphin County 13 (A) Construct or acquire a new county 14 maintenance facility including salt and 15 equipment storage buildings and site 16 development 13,800,000 17 (Base Project Allocation - $11,000,000) 18 (Land Allocation - $1,000,000) 19 (Design and Contingencies - $1,800,000) 20 (B) Construct or acquire a new PennDOT 21 driver and motor vehicle central 22 office/service center including design, 23 site acquisition and construction 58,000,000 24 (Base Project Allocation - $50,000,000) 25 (Land Allocation - $3,000,000) 26 (Design and Contingencies - $5,000,000) 27 (iii) Mifflin County 28 (A) Construct or acquire a new county 29 maintenance facility including salt and 30 equipment storage buildings and site 20070H1589B2107 - 32 -
1 development 13,800,000 2 (Base Project Allocation - $11,000,000) 3 (Land Allocation - $1,000,000) 4 (Design and Contingencies - $1,800,000) 5 (iv) Wyoming County 6 (A) Construct or acquire a new county 7 maintenance facility including salt and 8 equipment storage buildings and site 9 development 13,800,000 10 (Base Project Allocation - $11,000,000) 11 (Land Allocation - $1,000,000) 12 (Design and Contingencies - $1,800,000) 13 Section 4. Itemization of furniture and equipment projects. 14 Additional capital projects in the category of public 15 improvement projects consisting of the acquisition of movable 16 furniture and equipment to complete public improvement projects 17 and to be purchased by the Department of General Services, its 18 successors or assigns and to be financed by the incurring of 19 debt are hereby itemized, together with their respective 20 estimated financial costs, as follows: 21 Total 22 Project 23 Project Allocation 24 (1) Office of Administration 25 (i) Statewide mobile radio and microwave 26 system 27 (A) Additional funds for original 28 furniture and equipment to make the 29 Statewide radio and microwave system 30 DGS project 950-10 operational 21,000,000 20070H1589B2107 - 33 -
1 (2) Department of Conservation and Natural 2 Resources 3 (i) Benjamin Rush State Park 4 (A) Original furniture and equipment for 5 current capital projects 217,000 6 (ii) Cook Forest State Park 7 (A) Original furniture and equipment for 8 current capital projects 114,000 9 (iii) Delaware Canal State Park 10 (A) Original furniture and equipment for 11 current capital projects 200,000 12 (iv) Kinzua Bridge State Park 13 (A) Original furniture and equipment for 14 current capital projects 3,000,000 15 (v) Nescopeck State Park 16 (A) Original furniture and equipment for 17 current capital projects 150,000 18 (vi) Pine Grove Furnace State Park 19 (A) Original furniture and equipment for 20 current capital projects 200,000 21 (vii) Presque Isle State Park 22 (A) Original furniture and equipment for 23 current capital projects 400,000 24 (viii) Sinnemahoning State Park 25 (A) Original furniture and equipment for 26 current capital projects 2,000,000 27 (3) Department of Corrections 28 (i) State Correctional Institution at Dallas 29 (A) Original furniture and equipment for 30 the new institution 6,500,000 20070H1589B2107 - 34 -
1 (ii) State Correctional Institution at <-- 2 Huntingdon 3 (A) Original furniture and equipment for 4 the new institution 6,500,000 5 (iii) State Correctional Institution at 6 Rockview 7 (II) STATE CORRECTIONAL INSTITUTION AT <-- 8 GRATERFORD 9 (A) ORIGINAL FURNITURE AND EQUIPMENT FOR 10 THE NEW INSTITUTION AT SCI GRATERFORD 6,500,000 11 (III) STATE CORRECTIONAL INSTITUTION AT 12 HUNTINGDON 13 (A) ORIGINAL FURNITURE AND EQUIPMENT FOR 14 THE NEW INSTITUTION AT SCI HUNTINGDON 6,500,000 15 (IV) STATE CORRECTIONAL INSTITUTION AT 16 ROCKVIEW 17 (A) Original furniture and equipment for 18 the new institution 6,500,000 19 (4) Department of Education 20 (i) Scranton School for the Deaf 21 (A) Movable furniture and equipment to 22 allow modernization of classrooms and 23 other buildings to meet current 24 standards 2,625,000 25 (ii) Lincoln University 26 (A) Movable furniture and equipment to 27 allow construction project at Wright 28 Hall to become operational 3,000,000 29 (B) Movable furniture and equipment at 30 Langston Hughes Library for use for the 20070H1589B2107 - 35 -
1 completely renovated facility 4,000,000
2 (5) Pennsylvania Historical and Museum Commission
3 (i) Eckley Miners' Village
4 (A) Replacement of original furniture and
5 equipment associated with the visiting
6 public 1,920,000
7 (ii) Graeme Park
8 (A) Original furniture and equipment
9 associated with the new orientation
10 exhibit 720,000
11 (iii) Landis Valley Museum
12 (A) Construct new museum exhibits for the
13 expanded visitors' center building and
14 other buildings 1,800,000
15 (iv) State Records Center
16 (A) Original furniture and equipment
17 including a mobile high density storage
18 system 1,800,000
19 (6) State System of Higher Education
20 (i) Kutztown University of Pennsylvania
21 (A) Supplemental funding for the purchase
22 of movable furniture and equipment to
23 allow Schaffer Auditorium construction
24 project to become operational 500,000
25 (II) LOCK HAVEN UNIVERSITY OF PENNSYLVANIA <--
26 (A) CONSTRUCTION AND OTHER COSTS
27 ASSOCIATED WITH BUILDING A NEW INDOOR
28 ATHLETIC FACILITY 10,000,000
29 (ii) (III) Millersville University of <--
30 Pennsylvania
20070H1589B2107 - 36 -
1 (A) Supplemental funding for the purchase 2 of movable furniture and equipment to 3 allow Theatre Arts Education Building 4 construction project to become 5 operational 200,000 6 (iii) (IV) Shippensburg University of <-- 7 Pennsylvania 8 (A) Supplemental funding for the purchase 9 of movable furniture and equipment to 10 allow Huber Arts Center construction 11 project to become operational 500,000 12 (iv) (V) Slippery Rock University of <-- 13 Pennsylvania 14 (A) Supplemental funding for the purchase 15 of movable furniture and equipment to 16 allow Performing Arts Center 17 construction project to become 18 operational 1,000,000 19 Section 5. Itemization of transportation assistance projects. 20 (a) Mass transit.--Additional capital projects in the 21 category of transportation assistance projects for mass transit 22 in which an interest is to be acquired or constructed by the 23 Department of Transportation, its successors or assigns and to 24 be financed by the incurring of debt are hereby itemized, 25 together with their estimated financial costs, as follows: 26 Total 27 Project 28 Project Allocation 29 (1) Beaver County Transit Authority 30 (i) Provide for improvements in bus 20070H1589B2107 - 37 -
1 circulation, passenger waiting and terminal 2 areas at the Rochester Transportation 3 Center (RTC), pedestrian improvements with 4 the Transit Revitalization Investment 5 District (TRID) area and from the RTC to 6 the Rochester riverfront development and 7 signal preemption/prioritization request 8 system in the TRID area 317,000 9 (Base Project Allocation - $285,000) 10 (Design and Contingencies - $32,000) 11 (2) Berks Area Reading Transit Authority 12 (i) Purchase and install an Auto Vehicle 13 Locator System for both fixed route and 14 paratransit systems 167,000 15 (Base Project Allocation - $150,000) 16 (Design and Contingencies -$17,000) 17 (3) Cambria County Transit Authority 18 (i) Replace bus wash system, upgrade 19 communication system and purchase security 20 surveillance system 100,000 21 (Base Project Allocation - $90,000) 22 (Design and Contingencies - $10,000) 23 (ii) Construct rural transfer center to 24 increase service efficiency, attract new 25 riders and provide easier transfers for 26 riders 100,000 27 (Base Project Allocation - $90,000) 28 (Design and Contingencies - $10,000) 29 (4) Capital Area Transit 30 (i) Improve and renovate CAT's maintenance 20070H1589B2107 - 38 -
1 building to include three bays to repair 2 and service 40-foot low floor buses 233,000 3 (Base Project Allocation - $210,000) 4 (Design and Contingencies - $23,000) 5 (5) Centre Area Transportation Authority 6 (i) Purchase 16 buses to replace buses which 7 have met their useful life 167,000 8 (Base Project Allocation - $150,000) 9 (Design and Contingencies - $17,000) 10 (ii) Purchase automatic vehicle locator system 11 with the first phase to equip buses and 12 service vehicles with such items as the 13 automatic enunciators, electronic 14 performance monitoring, stop-by-stop 15 passenger counts, real time passenger 16 information via the Internet and at major 17 stops 156,000 18 (Base Project Allocation - $140,000) 19 (Design and Contingencies - $16,000) 20 (6) Crawford Area Transportation Authority 21 (i) Construct administrative intermodal center 22 in downtown Meadville and purchase bus 23 related equipment 333,000 24 (Base Project Allocation - $300,000) 25 (Design and Contingencies - $33,000) 26 (7) Erie Metropolitan Transit Authority 27 (i) Acquire five buses to replace five 28 existing buses which have exceeded their 29 useful life 379,000 30 (Base Project Allocation - $341,000) 20070H1589B2107 - 39 -
1 (Design and Contingencies - $38,000) 2 (ii) Renovate administration/maintenance 3 facility and purchase shop and 4 miscellaneous equipment 39,000 5 (Base Project Allocation - $35,000) 6 (Design and Contingencies - $4,000) 7 (iii) Purchase technology upgrades to radio 8 and fare box systems and complete system 9 wide signage 33,000 10 (Base Project Allocation - $30,000) 11 (Design and Contingencies - $3,000) 12 (7.1) PORT AUTHORITY OF ALLEGHENY COUNTY <-- 13 (I) FY 2009-2010 FEDERAL FLEX FUNDS (STP AND/OR 14 CMAQ) 2,000,000 15 (II) FY 2009-2010 SECTION 5309 FIXED GUIDEWAY 16 MODERNIZATION 5,000,000 17 (III) FY 2009-2010 EAST-WEST CORRIDOR RAPID 18 TRANSIT 5,000,000 19 (IV) FY 2009-2010 INFRASTRUCTURE SAFETY 20 RENEWAL PROGRAM (ISRP) 17,000,000 21 (V) FY 2009-2010 VEHICLE OVERHAUL 4,000,000 22 (VI) FY 2009-2010 SECTION 5307 FORMULA 23 PROGRAM 7,000,000 24 (7.2) LUZERNE COUNTY 25 (I) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE 26 AND OTHER RELATED COSTS FOR AN INTERMODAL 27 TRANSPORTATION FACILITY IN CITY OF WILKES- 28 BARRE 4,000,000 29 (8) Red Rose Transit Authority 30 (i) Replace bus washer and renovation and 20070H1589B2107 - 40 -
1 expand bus storage building 375,000 2 (Base Project Allocation - $337,000) 3 (Design and Contingencies - $38,000) 4 (ii) Design and construct new station on 5 AMTRAK Harrisburg to Philadelphia line in 6 Paradise Township, Lancaster County 200,000 7 (Base Project Allocation - $180,000) 8 (Design and Contingencies - $20,000) 9 (9) Shenango Valley Shuttle Service 10 (i) Construct a maintenance facility including 11 equipment and land acquisition 250,000 12 (Base Project Allocation - $225,000) 13 (Design and Contingencies - $25,000) 14 (10) Southeastern Pennsylvania Transportation 15 Authority 16 (i) Provide for the rehabilitation of 17 improvements at Croyden and Levittown 18 Stations located in Bucks County with 19 improvements to include the installation of 20 bus shelters and transit signage, station 21 improvements, bus access improvements at 22 both stations and parking expansion 3,500,000 23 (Base Project Allocation - $3,150,000) 24 (Design and Contingencies - $350,000) 25 (ii) Provide for the rehabilitation of 26 improvements to bus and rail intermodal 27 connections at the Glenside and Jenkintown 28 Stations in Montgomery County with 29 improvements to include design and 30 construction of a multilevel 384 space 20070H1589B2107 - 41 -
1 parking garage at Glenside Station and a 2 multilevel 700 space parking garage at 3 Jenkintown Station 6,700,000 4 (Base Project Allocation - $6,030,000) 5 (Design and Contingencies - $670,000) 6 (iii) FFY 2008 Transit Enhancement Program, 7 provide for renovation and preservation of 8 historic train stations and related 9 activities including bus shelters, 10 landscaping, street lights, pedestrian 11 access and walkways, bicycle access, 12 signage and enhanced access to transit for 13 persons with disabilities 670,000 14 (Base Project Allocation - $603,000) 15 (Design and Contingencies - $67,000) 16 (iv) Provide for construction of a multilevel 17 parking structure and pedestrian overpass 18 over AMTRAK tracks, to connect the west 19 side of the campus of Villanova to the main 20 campus, with parking for approximately 21 1,000 vehicles and be handicapped 22 accessible 625,000 23 (Base Project Allocation - $562,000) 24 (Design and Contingencies - $63,000) 25 (v) FFY 2002 Section 5309 Transit Enhancement 26 Program, provide additional funding for the 27 acquisition of 104 new rail cars for SEPTA 28 Regional Rail service 2,000,000 29 (Base Project Allocation - $1,800,000) 30 (Design and Contingencies - $200,000) 20070H1589B2107 - 42 -
1 (11) Union and Snyder Transit Authority 2 (i) Construct maintenance facility including 3 equipment and land acquisition 304,000 4 (Base Project Allocation - $273,000) 5 (Design and Contingencies - $31,000) 6 (12) Department of Transportation 7 (i) Provide for rail passenger improvements 8 across this Commonwealth including matching 9 funds for the Keystone Corridor Federal 10 funding 15,000,000 11 (Base Project Allocation - $13,500,000) 12 (Design and Contingencies - $1,500,000) 13 (ii) Provide for Intercity Bus Capital 14 Assistance Intermodal Projects and ADA 15 related facilities/equipment improvements 2,000,000 16 (Base Project Allocation - $1,800,000) 17 (Design and Contingencies - $200,000) 18 (b) Rural and intercity rail.--Additional capital projects 19 in the category of transportation assistance projects for rural 20 and intercity rail service projects to be constructed or with 21 respect to which an interest is to be acquired by the Department 22 of Transportation, its successors or assigns and to be financed 23 by the incurring of debt are hereby itemized, together with 24 their respective estimated financial costs, as follows: 25 Total 26 Project 27 Project Allocation 28 (1) ALLEGHENY VALLEY RAILROAD <-- 29 (I) P&W SUBDIVISION PHASE II RAILROAD 30 INFRASTRUCTURE REHABILITATION AND CAPACITY 20070H1589B2107 - 43 -
1 IMPROVEMENTS, INCLUDING TRACK, ROADBED,
2 BRIDGES AND GRADE CROSSINGS FROM MP 322 TO
3 MP 326 AND FROM MP 1 TO MP 31 IN ALLEGHENY
4 AND BUTLER COUNTIES 2,860,000
5 (BASE PROJECT ALLOCATION - $2,600,000)
6 (DESIGN AND CONTINGENCIES - $260,000)
7 (II) W&P SUBDIVISION PHASE II RAILROAD
8 INFRASTRUCTURE REHABILITATION AND CAPACITY
9 IMPROVEMENTS, INCLUDING TRACK, ROADBED,
10 BRIDGES AND GRADE CROSSINGS FROM MP 4 TO MP
11 39 IN ALLEGHENY AND WASHINGTON COUNTIES 2,530,000
12 (BASE PROJECT ALLOCATION - $2,300,000)
13 (DESIGN AND CONTINGENCIES - $230,000)
14 (III) GLENWOOD YARD NEW AND REBUILT YARD
15 TRACKS, CAPACITY IMPROVEMENTS, SAFETY
16 IMPROVEMENTS AND RAIL INFRASTRUCTURE
17 REHABILITATION, INCLUDING TRACK, ROADBED,
18 BRIDGES AND GRADE CROSSINGS IN ALLEGHENY
19 COUNTY 4,840,000
20 (BASE PROJECT ALLOCATION - $4,400,000)
21 (DESIGN AND CONTINGENCIES - $440,000)
22 (1) (2) Buffalo and Pittsburgh Railroad <--
23 (i) Rehabilitate mainline track in Armstrong,
24 Clearfield, Indiana and Jefferson Counties,
25 from Kittanning to Dubois and Punxsutawney
26 to Homer City with work to include tie and
27 rail replacement, surfacing, bridge repair,
28 switch, road crossing, signal,
29 communication and any other related work 5,000,000
30 (3) CENTRE COUNTY <--
20070H1589B2107 - 44 -
1 (I) CONSTRUCTION AND OTHER COSTS RELATED TO
2 THE SEDA WELDED RAIL PROJECT PHASE IV -
3 SAYERS DAM IN LIBERTY HOWARD BOGGS
4 TOWNSHIP 800,000
5 (4) LAWRENCE COUNTY
6 (I) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE
7 AND OTHER RELATED COSTS FOR RECONSTRUCTION
8 OF RAIL LINES IN ELLWOOD BOROUGH 10,000,000
9 (2) (5) Lehigh Valley Rail Management <--
10 (i) Construct access and storage tanks and
11 rehabilitate track within and around the
12 Bethlehem Commerce Center 3,500,000
13 (6) LUZERNE COUNTY <--
14 (I) ACQUISITION, CONSTRUCTION, INFRASTRUCTURE
15 AND OTHER RELATED COSTS FOR WHITNEY POINT
16 RAIL INFRASTRUCTURE PROJECT IN LUZERNE
17 TOWNSHIP 5,000,000
18 (7) NORTHUMBERLAND COUNTY
19 (I) INFRASTRUCTURE AND OTHER RELATED COSTS TO
20 EXTEND RAIL SERVICE TO THE SEEDCO
21 INDUSTRIAL PARK IN COAL TOWNSHIP 3,500,000
22 (8) WESTMORELAND COUNTY
23 (I) CONSTRUCTION AND OTHER RELATED COSTS FOR
24 THE NORFOLK SOUTHERN COMMUTER RAIL PROJECT 30,000,000
25 (II) DEVELOPMENT OF THE ALLE-KISKI COMMUTER
26 RAIL PROJECT 3,000,000
27 (9) WESTMORELAND COUNTY INDUSTRIAL DEVELOPMENT
28 CORPORATION
29 (I) MOUNT PLEASANT SUBDIVISION RAIL
30 INFRASTRUCTURE REHABILITATION AND CAPACITY
20070H1589B2107 - 45 -
1 IMPROVEMENTS, INCLUDING TRACK, ROADBED, 2 BRIDGES AND GRADE CROSSINGS FROM MP 0 TO MP 3 15 IN WESTMORELAND AND FAYETTE COUNTIES 2,860,000 4 (BASE PROJECT ALLOCATION - $2,600,000) 5 (DESIGN AND CONTINGENCIES - $260,000) 6 (II) RADEBAUGH SUBDIVISION RAIL INFRASTRUCTURE 7 REHABILITATION AND CAPACITY IMPROVEMENTS, 8 INCLUDING TRACK, ROADBED, BRIDGES AND GRADE 9 CROSSINGS FROM MP 0 TO MP 18 IN 10 WESTMORELAND COUNTY 2,640,000 11 (BASE PROJECT ALLOCATION - $2,400,000) 12 (DESIGN AND CONTINGENCIES - $240,000) 13 (III) DEVELOPMENT OF NEW YARD TRACK STRUCTURE 14 AND RAIL INFRASTRUCTURE REHABILITATION AND 15 CAPACITY IMPROVEMENTS, INCLUDING TRACK, 16 ROADBED, BRIDGES AND GRADE CROSSINGS WITHIN 17 WESTMORELAND RAIL FREIGHT TERMINAL IN 18 WESTMORELAND COUNTY 1,540,000 19 (BASE PROJECT ALLOCATION - $1,400,000) 20 (DESIGN AND CONTINGENCIES - $140,000) 21 (c) Air transportation.--Additional capital projects in the 22 category of transportation assistance projects for air 23 transportation service to which an interest is to be acquired by 24 the Department of Transportation, its successors or assigns and 25 to be financed by the incurring of debt are hereby itemized, 26 together with their respective estimated financial costs, as 27 follows: 28 Total 29 Project 30 Project Allocation 20070H1589B2107 - 46 -
1 (1) ALLEGHENY COUNTY <--
2 (I) ALLEGHENY COUNTY AIRPORT AUTHORITY
3 (A) UPGRADE TO ALLEGHENY COUNTY AIRPORT
4 TERMINAL AND SURROUNDING RUNWAYS IN
5 WEST MIFFLIN BOROUGH 500,000
6 (2) CLINTON COUNTY
7 (I) WILLIAM T PIPER MEMORIAL AIRPORT
8 (A) CONSTRUCTION, REDEVELOPMENT AND OTHER
9 COSTS RELATED TO THE AIRPORT HANGAR
10 REHABILITATION AND CONSTRUCTION PROJECT
11 IN LOCK HAVEN BOROUGH 500,000
12 (1) (3) Lehigh County <--
13 (i) Lehigh Valley International Airport
14 (A) Provide for the economic development
15 and safety enhancement at the airport 5,000,000
16 (Base Project Allocation - $4,500,000)
17 (Design and Contingencies - $500,000)
18 (4) LUZERNE COUNTY <--
19 (I) HAZLE TOWNSHIP
20 (A) ACQUISITION, CONSTRUCTION,
21 INFRASTRUCTURE AND OTHER RELATED COSTS
22 FOR THE DEVELOPMENT OF A CARGO AIRPORT 250,000,000
23 (5) WASHINGTON COUNTY
24 (I) SOUTH FRANKLIN TOWNSHIP
25 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER
26 RELATED COSTS FOR THE WASHINGTON COUNTY
27 AIRPORT INFRASTRUCTURE PROJECT 1,000,000
28 (B) ACQUISITION, CONSTRUCTION,
29 INFRASTRUCTURE AND OTHER RELATED COSTS
30 FOR THE WASHINGTON COUNTY AIRPORT
20070H1589B2107 - 47 -
1 EXPANSION 2,000,000
2 Section 6. Itemization of redevelopment assistance capital
3 projects.
4 (Reserved) <--
5 (1) ADAMS COUNTY <--
6 (I) COUNTY PROJECTS (RESERVED)
7 (2) ALLEGHENY COUNTY
8 (I) COUNTY PROJECTS
9 (A) ACQUISITION, CONSTRUCTION AND OTHER
10 RELATED COSTS FOR THE MILLVALE MARINA
11 TO SHARPSBURG RECREATION PROJECT 1,000,000
12 (II) CITY OF PITTSBURGH
13 (A) ACQUISITION, CONSTRUCTION,
14 INFRASTRUCTURE AND OTHER RELATED COSTS
15 FOR THE MORNINGSIDE COMMUNITY CENTER 725,000
16 (B) CONSTRUCTION AND OTHER RELATED COSTS
17 FOR PITTSBURGH LIFE SCIENCES EXPANSION 1,000,000
18 (C) CONSTRUCTION, ACQUISITION,
19 INFRASTRUCTURE, REDEVELOPMENT AND OTHER
20 COSTS RELATED TO THE REVITALIZATION AT
21 PERRY SOUTH 1,500,000
22 (D) CONSTRUCTION, INFRASTRUCTURE,
23 REDEVELOPMENT AND OTHER COSTS RELATED
24 TO ALLEGHENY GENERAL HOSPITAL
25 RENOVATIONS 7,000,000
26 (E) CONSTRUCTION, ACQUISITION,
27 REDEVELOPMENT AND OTHER COSTS RELATED
28 TO THE CENTER AVENUE AND THELMA LOVETTE
29 FAMILY YMCA PROJECTS 3,500,000
30 (F) CONSTRUCTION AND OTHER RELATED COSTS
20070H1589B2107 - 48 -
1 FOR THE RENOVATION OF THE MARIAN MANOR 2 SENIOR HEALTH FACILITY 550,000 3 (G) CONSTRUCTION, ACQUISITION, 4 INFRASTRUCTURE, REDEVELOPMENT, 5 ABATEMENT OF HAZARDOUS MATERIALS AND 6 OTHER COSTS RELATED TO THE STRIP 7 DISTRICT PROJECT 6,000,000 8 (H) CONSTRUCTION, INFRASTRUCTURE, 9 REDEVELOPMENT AND OTHER COSTS 10 ASSOCIATED WITH THE BEECHVIEW 11 REDEVELOPMENT PROJECT 3,000,000 12 (I) CONSTRUCTION, INFRASTRUCTURE AND OTHER 13 RELATED COSTS FOR STRIP DISTRICT 14 IMPROVEMENTS 2,000,000 15 (J) CONSTRUCTION, INFRASTRUCTURE AND OTHER 16 RELATED COSTS FOR STRIP DISTRICT 17 INFRASTRUCTURE IMPROVEMENTS 6,000,000 18 (K) CONSTRUCTION AND OTHER RELATED COSTS 19 TO RENOVATE FAMILY HOUSE UNIVERSITY 20 CLUB 1,500,000 21 (L) CONSTRUCTION, REDEVELOPMENT AND OTHER 22 COSTS ASSOCIATED WITH RENOVATION AND 23 EXPANSION OF THE ROBERT MORRIS 24 UNIVERSITY DOWNTOWN CAMPUS 5,000,000 25 (M) ACQUISITION, CONSTRUCTION AND OTHER 26 RELATED COSTS FOR UPMC ST. MARGARET 27 EXPANSION 15,600,000 28 (N) CONSTRUCTION, INFRASTRUCTURE AND OTHER 29 RELATED COSTS TO RESTORE AND EXPAND 30 DEANS ATHLETIC FIELD COMMUNITY PARK 588,000 20070H1589B2107 - 49 -
1 (O) CONSTRUCTION, ACQUISITION, 2 INFRASTRUCTURE, REDEVELOPMENT, 3 ABATEMENT OF HAZARDOUS MATERIALS AND 4 OTHER COSTS RELATED TO THE DEVELOPMENT 5 OF LAWRENCEVILLE 10,000,000 6 (P) CONSTRUCTION AND OTHER RELATED COSTS 7 FOR RIVERVIEW TOWERS RENOVATIONS 1,800,000 8 (Q) CONSTRUCTION, INFRASTRUCTURE AND 9 RELATED COSTS FOR THE GRANDVIEW SCENIC 10 BYWAY PROJECT 1,000,000 11 (R) CONSTRUCTION AND OTHER RELATED COSTS 12 FOR THE BROOKLINE BOULEVARD PROJECT 3,900,000 13 (S) CONSTRUCTION AND OTHER RELATED COSTS 14 FOR THE HOMEWOOD BRUSHTON COMMUNITY 15 DEVELOPMENT CORPORATION STERRET-COLLIER 16 CORRIDOR REVITALIZATION 5,000,000 17 (T) CONSTRUCTION AND OTHER RELATED COSTS 18 FOR ROUTE 51 CORRIDOR REDEVELOPMENT AND 19 IMPROVEMENT 5,000,000 20 (U) CONSTRUCTION, INFRASTRUCTURE AND OTHER 21 RELATED COSTS FOR THE NATIONAL AVIARY 22 EXPANSION 5,000,000 23 (V) CONSTRUCTION, INFRASTRUCTURE AND OTHER 24 RELATED COSTS FOR THE URBAN LEAGUE OF 25 GREATER PITTSBURGH CHARTER SCHOOL 1,500,000 26 (W) CONSTRUCTION AND OTHER RELATED COSTS 27 FOR THE REVITALIZATION OF BROADWAY 28 AVENUE 7,000,000 29 (III) BALDWIN BOROUGH 30 (A) CONSTRUCTION AND OTHER RELATED COSTS 20070H1589B2107 - 50 -
1 TO RENOVATE FIRE DEPARTMENT BUILDING 500,000 2 (IV) BETHEL PARK 3 (A) CONSTRUCTION AND OTHER RELATED COSTS 4 FOR THE BETHEL PARK COMMUNITY CENTER 5 EXPANSION 2,500,000 6 (V) BOROUGH OF WILKINSBURG 7 (A) CONSTRUCTION AND OTHER RELATED COSTS 8 FOR THE REVITALIZATION OF COMMERCIAL 9 CORRIDOR INCLUDING RESIDENTIAL HOUSING 5,000,000 10 (VI) DRAVOSBURG BOROUGH 11 (A) ACQUISITION, CONSTRUCTION AND OTHER 12 RELATED COSTS FOR THE DRAVOSBURG 13 WATERFRONT DEVELOPMENT 500,000 14 (VII) GLASSPORT BOROUGH 15 (A) CONSTRUCTION AND OTHER RELATED COSTS 16 FOR THE MUNICIPAL BUILDING 17 REDEVELOPMENT 500,000 18 (B) ACQUISITION, CONSTRUCTION AND OTHER 19 RELATED COSTS FOR DEMOLITION AND 20 REDEVELOPMENT OF ABANDONED PROPERTIES 500,000 21 (VIII) GREEN TREE BOROUGH 22 (A) CONSTRUCTION AND OTHER RELATED COSTS 23 FOR AIKEN ELEMENTARY SCHOOL 24 IMPROVEMENTS 500,000 25 (B) CONSTRUCTION AND OTHER RELATED COSTS 26 FOR THE GREEN TREE ROAD IMPROVEMENT 27 PROJECT 3,000,000 28 (IX) TOWN OF MCCANDLESS 29 (A) CONSTRUCTION AND OTHER RELATED COSTS 30 FOR THE UPMC PASSAVANT PATIENT TOWER 20070H1589B2107 - 51 -
1 EXPANSION 20,000,000 2 (X) CITY OF MCKEESPORT 3 (A) CONSTRUCTION, ABATEMENT OF HAZARDOUS 4 MATERIALS AND OTHER COSTS ASSOCIATED 5 WITH THE MCKEESPORT FIRE DEPARTMENT 6 BUILDING PROJECT 1,000,000 7 (XI) MT. LEBANON TOWNSHIP 8 (A) CONSTRUCTION AND OTHER RELATED COSTS 9 FOR THE REDEVELOPMENT OF WASHINGTON 10 ROAD BUSINESS DISTRICT 2,500,000 11 (B) CONSTRUCTION AND OTHER RELATED COSTS 12 FOR A TRANSIT-ORIENTED DEVELOPMENT 13 PROJECT 1,000,000 14 (3) ARMSTRONG COUNTY (RESERVED) 15 (4) BEAVER COUNTY 16 (I) COUNTY PROJECTS (RESERVED) 17 (A) ACQUISITION, CONSTRUCTION, 18 INFRASTRUCTURE AND OTHER RELATED COSTS 19 FOR A FAMILY SERVICES CENTER 3,000,000 20 (II) CENTER TOWNSHIP 21 (A) ACQUISITION, CONSTRUCTION, 22 INFRASTRUCTURE AND OTHER RELATED COSTS 23 FOR THE GETAWAY YOUTH SERVICES CENTER 3,000,000 24 (5) BEDFORD COUNTY (RESERVED) 25 (6) BERKS COUNTY 26 (I) COUNTY PROJECTS 27 (A) CARPENTER TECHNOLOGY, EXPANSION 28 PROJECT, FOR CONSTRUCTION, 29 INFRASTRUCTURE IMPROVEMENTS AND OTHER 30 RELATED COSTS FOR A MANUFACTURING AND 20070H1589B2107 - 52 -
1 ECONOMIC DEVELOPMENT PROJECT 27,000,000 2 (7) BLAIR COUNTY (RESERVED) 3 (8) BRADFORD COUNTY (RESERVED) 4 (9) BUCKS COUNTY 5 (I) COUNTY PROJECTS (RESERVED) 6 (II) BRISTOL BOROUGH 7 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 8 RELATED COSTS FOR PARKING FACILITIES 3,000,000 9 (B) CONSTRUCTION, INFRASTRUCTURE AND OTHER 10 RELATED COSTS FOR WATERFRONT 11 DEVELOPMENT 2,000,000 12 (C) ACQUISITION, CONSTRUCTION, 13 INFRASTRUCTURE AND OTHER RELATED COSTS 14 FOR WATERFRONT DEVELOPMENT ALONG THE 15 DELAWARE RIVER 2,000,000 16 (D) ACQUISITION, CONSTRUCTION, 17 INFRASTRUCTURE AND OTHER RELATED COSTS 18 FOR ELM AND CHESTNUT STREETS 19 REDEVELOPMENT 2,500,000 20 (III) BRISTOL TOWNSHIP 21 (A) INFRASTRUCTURE, REDEVELOPMENT AND 22 OTHER RELATED COSTS TO CONVERT THE 23 LOWER BUCKS HOSPITAL TO A FULL 24 TELEMETRY-BASED HOSPITAL 1,000,000 25 (B) INFRASTRUCTURE, REDEVELOPMENT AND 26 OTHER RELATED COSTS FOR LOWER BUCKS 27 HOSPITAL SECURITY UPGRADES AND 28 BIOTERRORISM TRAINING 575,000 29 (C) CONSTRUCTION, INFRASTRUCTURE AND OTHER 30 RELATED COSTS TO REBUILD THE LOWER 20070H1589B2107 - 53 -
1 BUCKS HOSPITAL PATIENT UNIT 4F 3,000,000 2 (D) INFRASTRUCTURE, REDEVELOPMENT AND 3 OTHER RELATED COSTS TO PURCHASE THREE 4 PORTABLE ORTHOPEDIC X-RAY MACHINES FOR 5 LOWER BUCKS HOSPITAL 420,000 6 (E) CONSTRUCTION, INFRASTRUCTURE AND OTHER 7 RELATED COSTS FOR THE RENOVATION OF THE 8 BRISTOL TOWNSHIP MUNICIPAL BUILDING 8,000,000 9 (F) INFRASTRUCTURE, REDEVELOPMENT AND 10 OTHER RELATED COSTS TO BUILD A LOWER 11 BUCKS HOSPITAL VASCULAR LAB 2,000,000 12 (G) INFRASTRUCTURE, REDEVELOPMENT AND 13 OTHER RELATED COSTS FOR SAFETY AND CODE 14 UPGRADES FOR LOWER BUCKS HOSPITAL 2,500,000 15 (H) INFRASTRUCTURE, REDEVELOPMENT AND 16 OTHER RELATED COSTS TO PURCHASE A 64- 17 SLICE CT SCANNER FOR LOWER BUCKS 18 HOSPITAL 2,500,000 19 (I) INFRASTRUCTURE, REDEVELOPMENT AND 20 OTHER RELATED COSTS TO PURCHASE TWO 21 DIGITAL MAMMOGRAPHY SYSTEMS FOR LOWER 22 BUCKS HOSPITAL 725,000 23 (J) INFRASTRUCTURE, REDEVELOPMENT AND 24 OTHER RELATED COSTS TO PURCHASE 25 COMPUTERIZED PHYSICIAN ORDER ENTRY 26 (CPOE)SYSTEMS FOR LOWER BUCKS HOSPITAL 1,500,000 27 (IV) FALLS TOWNSHIP 28 (A) CONSTRUCTION AND OTHER RELATED COSTS 29 FOR THE FALLS TOWNSHIP SENIOR CITIZEN 30 CENTER 1,000,000 20070H1589B2107 - 54 -
1 (B) ACQUISITION, CONSTRUCTION, 2 INFRASTRUCTURE AND OTHER RELATED COSTS 3 FOR THE YMCA COMMUNITY CENTER AT SNIPES 4 FARM 4,000,000 5 (V) MIDDLETOWN TOWNSHIP 6 (A) CONSTRUCTION AND OTHER RELATED COSTS 7 FOR THE MIDDLETOWN COMMUNITY CENTER 1,500,000 8 (10) BUTLER COUNTY (RESERVED) 9 (11) CAMBRIA COUNTY 10 (I) COUNTY PROJECTS (RESERVED) 11 (II) CITY OF JOHNSTOWN 12 (A) ACQUISITION, CONSTRUCTION, 13 INFRASTRUCTURE AND OTHER RELATED COSTS 14 FOR BROWNFIELD REDEVELOPMENT INCLUDING 15 FESTIVAL PARK 5,000,000 16 (B) ACQUISITION, CONSTRUCTION, 17 INFRASTRUCTURE AND OTHER RELATED COSTS 18 FOR DOWNTOWN HOUSING REDEVELOPMENT 5,000,000 19 (C) ACQUISITION, CONSTRUCTION, 20 INFRASTRUCTURE AND OTHER RELATED COSTS 21 FOR GREATER JOHNSTOWN YMCA 22 REDEVELOPMENT INCLUDING A COMMUNITY 23 CENTER 5,000,000 24 (III) RICHLAND TOWNSHIP 25 (A) ACQUISITION, CONSTRUCTION, 26 INFRASTRUCTURE AND OTHER RELATED COSTS 27 FOR THE EAST HILLS REDEVELOPMENT 28 INCLUDING A RECREATION CENTER 7,000,000 29 (12) CAMERON COUNTY (RESERVED) 30 (13) CARBON COUNTY 20070H1589B2107 - 55 -
1 (I) COUNTY PROJECTS (RESERVED) 2 (II) PALMERTON BOROUGH 3 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 4 RELATED COSTS FOR THE REGIONAL WALL 5 STREET WEST INITIATIVE 25,000,000 6 (III) WEATHERLY BOROUGH 7 (A) ACQUISITION, CONSTRUCTION, 8 INFRASTRUCTURE AND OTHER RELATED COSTS 9 FOR THE RAILROAD/STEEL REVITALIZATION 10 PROJECT 1,500,000 11 (14) CENTRE COUNTY 12 (I) COUNTY PROJECTS 13 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 14 RELATED COSTS FOR THE EXPANSION OF CPI 15 WORKFORCE DEVELOPMENT 1,000,000 16 (B) CONSTRUCTION, INFRASTRUCTURE AND OTHER 17 RELATED COSTS FOR A NEW BIOFUELS PLANT 25,000,000 18 (C) CONSTRUCTION, INFRASTRUCTURE AND OTHER 19 RELATED COSTS FOR THE PHILLIPSBURG 20 BOROUGH HALL 2,000,000 21 (D) ACQUISITION, CONSTRUCTION AND OTHER 22 RELATED COSTS FOR THE HOPE AND RELIANCE 23 UNITED FIREFIGHTER CENTER 1,000,000 24 (E) ACQUISITION, CONSTRUCTION, 25 INFRASTRUCTURE AND OTHER RELATED COSTS 26 FOR THE CENTRE COUNTY RECREATION 27 CENTER 20,000,000 28 (F) CONSTRUCTION, INFRASTRUCTURE AND OTHER 29 RELATED COSTS FOR THE MOSHANNON VALLEY 30 ECONOMIC PARTNERSHIP INDUSTRIAL PARK 1,000,000 20070H1589B2107 - 56 -
1 (II) STATE COLLEGE BOROUGH 2 (A) ACQUISITION, CONSTRUCTION, 3 INFRASTRUCTURE AND OTHER RELATED COSTS 4 FOR A DOWNTOWN REDEVELOPMENT PROJECT 12,000,000 5 (15) CHESTER COUNTY (RESERVED) 6 (16) CLARION COUNTY (RESERVED) 7 (17) CLEARFIELD COUNTY 8 (I) COUNTY PROJECTS 9 (A) CONSTRUCTION AND OTHER RELATED COSTS 10 FOR THE WOOD PELLET MILL PROJECT 1,000,000 11 (B) CONSTRUCTION AND OTHER COSTS 12 ASSOCIATED WITH THE BIOMASS CONVERSION 13 CENTER OF EXCELLENCE 2,750,000 14 (C) CONSTRUCTION, INFRASTRUCTURE AND OTHER 15 COSTS RELATED TO COAL GASIFICATION 16 PROJECT 20,000,000 17 (II) CLEARFIELD BOROUGH 18 (A) ACQUISITION, CONSTRUCTION, 19 INFRASTRUCTURE AND OTHER RELATED COSTS 20 FOR RIVERFRONT DEVELOPMENT 6,000,000 21 (III) CURWENSVILLE BOROUGH 22 (A) INFRASTRUCTURE AND OTHER COSTS RELATED 23 TO BUILDING THE SUNNYSIDE ETHANOL 24 MANUFACTURING PLANT 5,000,000 25 (IV) KARTHAUS TOWNSHIP 26 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 27 COSTS ASSOCIATED WITH THE RIVER HILL 28 POWER WASTE COAL FIRED POWER PLANT 15,000,000 29 (V) LAWRENCE TOWNSHIP 30 (A) CONSTRUCTION AND OTHER RELATED COSTS 20070H1589B2107 - 57 -
1 FOR A BIOENERGY ETHANOL PLANT 5,000,000 2 (18) CLINTON COUNTY 3 (I) COUNTY PROJECTS 4 (A) ACQUISITION, CONSTRUCTION AND OTHER 5 RELATED COSTS FOR THE BEECH CREEK 6 WATERSHED PROJECT 5,000,000 7 (B) CONSTRUCTION AND OTHER RELATED COSTS 8 FOR THE ANNIE HALENBAKE ROSS LIBRARY 9 AND RENOVO LIBRARY 1,000,000 10 (C) ACQUISITION, CONSTRUCTION, 11 INFRASTRUCTURE AND OTHER RELATED COSTS 12 FOR THE SUSQUEHANNA RIVER CORRIDOR 2,000,000 13 (II) CITY OF LOCK HAVEN 14 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 15 COSTS ASSOCIATED WITH THE DOWNTOWN 16 STREETSCAPE IMPROVEMENT PROJECT 1,250,000 17 (B) CONSTRUCTION AND OTHER RELATED COSTS 18 FOR THE FIRST QUALITY PRODUCTS 19 MANUFACTURING FACILITY 1,000,000 20 (III) MILL HALL BOROUGH 21 (A) ACQUISITION, CONSTRUCTION AND OTHER 22 RELATED COSTS FOR MILLBROOK PLAYHOUSE 1,000,000 23 (IV) WAYNE TOWNSHIP 24 (A) CONSTRUCTION AND OTHER RELATED COSTS 25 FOR ZINDEL PARK DEVELOPMENT AND 26 IMPROVEMENTS 500,000 27 (19) COLUMBIA COUNTY (RESERVED) 28 (20) CRAWFORD COUNTY (RESERVED) 29 (21) CUMBERLAND COUNTY (RESERVED) 30 (22) DAUPHIN COUNTY 20070H1589B2107 - 58 -
1 (I) COUNTY PROJECTS (RESERVED) 2 (II) CITY OF HARRISBURG 3 (A) CONSTRUCTION AND OTHER RELATED COSTS 4 FOR THE PINNACLE HEALTH HOSPITAL 5 EMERGENCY DEPARTMENT 5,000,000 6 (B) CONSTRUCTION, INFRASTRUCTURE AND OTHER 7 RELATED COSTS FOR RENOVATION OF THE 8 WHITAKER CENTER FOR SCIENCE AND THE 9 ARTS 1,500,000 10 (23) DELAWARE COUNTY 11 (I) COUNTY PROJECTS 12 (A) ACQUISITION AND OTHER RELATED COSTS TO 13 TRI BOROUGH FIRE COMPANY CONSOLIDATION 500,000 14 (II) CITY OF CHESTER 15 (A) ACQUISITION, CONSTRUCTION, 16 INFRASTRUCTURE AND OTHER RELATED COSTS 17 FOR THE DOWNTOWN REVITALIZATION 5,000,000 18 (III) HAVERFORD TOWNSHIP 19 (A) CONSTRUCTION AND OTHER RELATED COSTS 20 FOR THE HAVERFORD TOWNSHIP COMMUNITY 21 CENTER 8,000,000 22 (IV) RIDLEY TOWNSHIP 23 (A) CONSTRUCTION OF NEW TOWNSHIP COMMUNITY 24 CENTER 1,000,000 25 (B) CONSTRUCTION, INFRASTRUCTURE AND OTHER 26 RELATED COSTS FOR THE RIDLEY TOWNSHIP 27 COMMUNITY CENTER 2,000,000 28 (V) SWARTHMORE BOROUGH 29 (A) CONSTRUCTION, ACQUISITION, 30 INFRASTRUCTURE AND OTHER COSTS RELATED 20070H1589B2107 - 59 -
1 TO THE SWARTHMORE TOWN CENTER 2 DEVELOPMENT 2,000,000 3 (24) ELK COUNTY (RESERVED) 4 (25) ERIE COUNTY 5 (I) COUNTY PROJECTS (RESERVED) 6 (II) CITY OF ERIE 7 (A) ACQUISITION, CONSTRUCTION, 8 INFRASTRUCTURE AND OTHER RELATED COSTS 9 FOR DOWNTOWN ERIE REVITALIZATION 15,000,000 10 (26) FAYETTE COUNTY 11 (I) COUNTY PROJECTS (RESERVED) 12 (II) CITY OF UNIONTOWN 13 (A) CONSTRUCTION AND OTHER COSTS RELATED 14 TO THE EXPANSION AND RENOVATION OF 15 UNIONTOWN HOSPITAL 10,000,000 16 (III) BROWNSVILLE BOROUGH 17 (A) ACQUISITION, CONSTRUCTION, 18 INFRASTRUCTURE AND OTHER RELATED COSTS 19 FOR THE DOWNTOWN REVITALIZATION 2,000,000 20 (IV) PERRY TOWNSHIP 21 (A) CONSTRUCTION OF NEW TOWNSHIP MUNICIPAL 22 BUILDING 1,000,000 23 (27) FOREST COUNTY (RESERVED) 24 (28) FRANKLIN COUNTY (RESERVED) 25 (29) FULTON COUNTY (RESERVED) 26 (30) GREEN COUNTY 27 (I) COUNTY PROJECTS (RESERVED) 28 (II) CUMBERLAND TOWNSHIP 29 (A) CONSTRUCTION, INFRASTRUCTURE, 30 REDEVELOPMENT AND OTHER COSTS 20070H1589B2107 - 60 -
1 ASSOCIATED WITH THE CARMICHAELS CLINIC 2 EXPANSION 500,000 3 (III) FRANKLIN TOWNSHIP 4 (A) ACQUISITION, CONSTRUCTION AND RELATED 5 SITE PREPARATION FOR THE CORNERSTONE 6 HEALTH CARE CENTER 750,000 7 (B) CONSTRUCTION AND OTHER RELATED COSTS 8 FOR THE COMMUNITY AQUATIC CENTER 1,000,000 9 (C) CONSTRUCTION AND OTHER RELATED COSTS 10 FOR THE EXPANSIONS OF THE ADDITION OF 11 SOUTHWEST REGIONAL MEDICAL CENTER 1,500,000 12 (IV) PERRY TOWNSHIP 13 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 14 RELATED COSTS FOR THE MEADOW RIDGE 15 BUSINESS PARK 3,000,000 16 (V) WAYNESBURG BOROUGH 17 (A) CONSTRUCTION, ACQUISITION, 18 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 19 COSTS ASSOCIATED WITH DOWNTOWN 20 WAYNESBURG STREETSCAPE IMPROVEMENTS 1,000,000 21 (B) ACQUISITION, CONSTRUCTION, 22 INFRASTRUCTURE AND OTHER RELATED COSTS 23 FOR THE GREENE COUNTY ARC PROJECT 1,000,000 24 (C) ACQUISITION, CONSTRUCTION, 25 INFRASTRUCTURE AND OTHER RELATED COSTS 26 FOR WAYNESBURG REDEVELOPMENT PROJECT 2,000,000 27 (31) HUNTINGDON COUNTY (RESERVED) 28 (32) INDIANA COUNTY (RESERVED) 29 (33) JEFFERSON COUNTY (RESERVED) 30 (34) JUNIATA COUNTY (RESERVED) 20070H1589B2107 - 61 -
1 (35) LACKAWANNA COUNTY 2 (I) COUNTY PROJECTS (RESERVED) 3 (II) DUNMORE BOROUGH 4 (A) CONSTRUCTION AND OTHER COSTS RELATED 5 TO BUILDING THE DUNMORE FIRE STATION 1,400,000 6 (B) CONSTRUCTION, INFRASTRUCTURE, 7 REDEVELOPMENT AND OTHER COSTS RELATED 8 TO BUILDING THE DUNMORE HIGH SCHOOL 9 HEALTH AND FITNESS CENTER 1,000,000 10 (III) CITY OF SCRANTON 11 (A) ACQUISITION AND OTHER COSTS RELATED TO 12 PROVIDING THE VOCATIONAL SERVICES 13 COMMUNITY EMPLOYMENT PROGRAM AND 14 SHELTERED WORKSHOP 1,000,000 15 (B) CONSTRUCTION, INFRASTRUCTURE, 16 REDEVELOPMENT AND OTHER COSTS RELATED 17 TO THE WEST SCRANTON REVITALIZATION 18 PROJECT 3,000,000 19 (C) CONSTRUCTION, REDEVELOPMENT AND OTHER 20 COSTS RELATED TO THE NEY AUG ZOO 21 RENOVATION AND ADDITION 10,000,000 22 (IV) SOUTH ABINGTON TOWNSHIP 23 (A) ACQUISITION, REDEVELOPMENT AND COSTS 24 ASSOCIATED WITH BUILDING THE SOUTH 25 ABINGTON TOWNSHIP COMMUNITY CENTER 1,200,000 26 (V) THROOP BOROUGH 27 (A) CONSTRUCTION, REDEVELOPMENT AND OTHER 28 COSTS RELATED TO RENOVATION OF THROOP 29 HOSE COMPANY NO. 3 1,000,000 30 (B) CONSTRUCTION, ACQUISITION AND OTHER 20070H1589B2107 - 62 -
1 COSTS RELATED TO BUILDING THROOP HOSE 2 COMPANY NO. 2 1,260,000 3 (36) LANCASTER COUNTY 4 (I) COUNTY PROJECTS (RESERVED) 5 (II) CITY OF LANCASTER 6 (A) CONSTRUCTION AND OTHER RELATED COSTS 7 FOR THE THADDEUS STEVENS TECHNOLOGY 8 CENTER 4,000,000 9 (B) INFRASTRUCTURE AND OTHER COSTS 10 ASSOCIATED WITH LANCASTER WIRELESS 11 ACCESS 1,000,000 12 (37) LAWRENCE COUNTY 13 (I) COUNTY PROJECTS 14 (A) CONSTRUCTION, ACQUISITION, 15 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 16 COSTS RELATED TO THE LAWRENCE COUNTY 17 SOUTH CENTRAL ROUTE 18 DEVELOPMENT 18 DISTRICT 12,000,000 19 (B) CONSTRUCTION, ACQUISITION, 20 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 21 COSTS RELATED TO THE CENTRAL LAWRENCE 22 COUNTY ROUTE 422 CORRIDOR DEVELOPMENT 23 AREA 8,000,000 24 (II) ELWOOD CITY BOROUGH 25 (A) ACQUISITION, CONSTRUCTION, 26 INFRASTRUCTURE AND OTHER RELATED COSTS 27 FOR THE ELLWOOD BOROUGH EAST COMMERCE 28 PARK 10,000,000 29 (38) LEBANON COUNTY 30 (I) COUNTY PROJECTS (RESERVED) 20070H1589B2107 - 63 -
1 (II) CITY OF LEBANON 2 (A) ACQUISITION, CONSTRUCTION, 3 INFRASTRUCTURE AND OTHER RELATED COSTS 4 FOR DOWNTOWN URBAN CORRIDOR 5 REVITALIZATION 10,000,000 6 (39) LEHIGH COUNTY 7 (I) COUNTY PROJECTS (RESERVED) 8 (II) CITY OF ALLENTOWN 9 (A) CONSTRUCTION, REDEVELOPMENT AND OTHER 10 COSTS ASSOCIATED WITH EXPANSION AND 11 RENOVATION OF LEHIGH VALLEY HOSPITAL 1,000,000 12 (B) ACQUISITION, REDEVELOPMENT, 13 STREETSCAPE IMPROVEMENT AND OTHER COSTS 14 RELATED TO THE 7TH STREET PROPERTY 15 ACQUISITION AND BEAUTIFICATION PROJECT 3,000,000 16 (C) ACQUISITION, REDEVELOPMENT AND OTHER 17 COSTS RELATED TO THE AMERICUS DESIGN 18 CENTER 5,000,000 19 (D) ACQUISITION, REDEVELOPMENT AND OTHER 20 COSTS ASSOCIATED WITH BUILDING THE 21 ALLENTOWN CONFERENCE/CONVENTION CENTER 5,000,000 22 (E) ACQUISITION, PARK LAND RECLAMATION AND 23 OTHER COSTS RELATED TO THE ST. ELMO 24 PARK DEVELOPMENT 3,000,000 25 (F) ACQUISITION, REDEVELOPMENT AND OTHER 26 COSTS ASSOCIATED WITH THE PERFORMING 27 AND VISUAL ARTS CENTER 7,000,000 28 (III) CITY OF BETHLEHEM 29 (A) CONSTRUCTION AND OTHER RELATED COSTS 30 FOR THE RENOVATION AND EXPANSION OF THE 20070H1589B2107 - 64 -
1 LEHIGH VALLEY HOSPITAL-MUHLENBERG 5,000,000 2 (40) LUZERNE COUNTY 3 (I) COUNTY PROJECTS (RESERVED) 4 (II) ASHLEY BOROUGH 5 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 6 RELATED COSTS FOR THE ASHLEY LANE 7 PROJECT 500,000 8 (B) ACQUISITION, CONSTRUCTION AND OTHER 9 RELATED COSTS FOR THE MILL STREET MILL 10 PROJECT 500,000 11 (III) CITY OF NANTICOKE 12 (A) ACQUISITION, CONSTRUCTION, 13 INFRASTRUCTURE AND OTHER RELATED COSTS 14 FOR MIXED-USE DEVELOPMENT ON EAST MAIN 15 STREET 1,000,000 16 (B) CONSTRUCTION, INFRASTRUCTURE AND OTHER 17 RELATED COSTS FOR THE LUZERNE COUNTY 18 COMMUNITY COLLEGE PUBLIC SAFETY 19 INSTITUTE 1,000,000 20 (C) CONSTRUCTION AND OTHER RELATED COSTS 21 FOR DOWNTOWN PARKING EXPANSION 2,000,000 22 (D) ACQUISITION, CONSTRUCTION, 23 INFRASTRUCTURE AND OTHER RELATED COSTS 24 FOR LUZERNE COUNTY COMMUNITY COLLEGE 25 STUDENT HOUSING 2,000,000 26 (E) CONSTRUCTION, INFRASTRUCTURE, 27 REDEVELOPMENT AND OTHER COSTS RELATED 28 TO NEW HOUSING AT SUSQUEHANNA COAL 29 BUILDING 500,000 30 (F) ACQUISITION, CONSTRUCTION AND OTHER 20070H1589B2107 - 65 -
1 RELATED COSTS FOR THE LOWER BROADWAY 2 PARK MULTI-USE PROJECT 1,000,000 3 (G) ACQUISITION, CONSTRUCTION, 4 INFRASTRUCTURE AND OTHER RELATED COSTS 5 FOR THE LUZERNE COUNTY COMMUNITY 6 COLLEGE CULINARY ARTS BUILDING WITH 7 PARKING 3,000,000 8 (IV) CITY OF WILKES-BARRE 9 (A) ACQUISITION, CONSTRUCTION, 10 INFRASTRUCTURE AND OTHER RELATED COSTS 11 FOR THE REVITALIZATION OF THE 100 BLOCK 12 OF SOUTH MAIN STREET 13,000,000 13 (B) CONSTRUCTION, INFRASTRUCTURE AND OTHER 14 RELATED COSTS FOR THE RENOVATION OF THE 15 PUBLIC SQUARE 1,500,000 16 (C) CONSTRUCTION, INFRASTRUCTURE AND OTHER 17 RELATED COSTS FOR THE REDEVELOPMENT OF 18 THE KIRBY PARK RECREATION AREA 750,000 19 (D) CONSTRUCTION, INFRASTRUCTURE, 20 REDEVELOPMENT, ABATEMENT OF HAZARDOUS 21 MATERIALS AND OTHER COSTS RELATED TO 22 BUILDING THE IREM TEMPLE MOSQUE 10,000,000 23 (E) CONSTRUCTION, INFRASTRUCTURE, 24 ABATEMENT OF HAZARDOUS MATERIALS AND 25 OTHER COSTS RELATED TO IMPACT WILKES- 26 BARRE 5,000,000 27 (F) CONSTRUCTION, INFRASTRUCTURE, 28 ACQUISITION, ABATEMENT OF HAZARDOUS 29 MATERIALS, REDEVELOPMENT AND OTHER 30 COSTS RELATED TO IMPACT WILKES-BARRE 3,000,000 20070H1589B2107 - 66 -
1 (G) CONSTRUCTION, INFRASTRUCTURE, 2 ACQUISITION, ABATEMENT OF HAZARDOUS 3 MATERIALS, REDEVELOPMENT AND OTHER 4 COSTS RELATES TO DOWNTOWN WILKES-BARRE 5 REVITALIZATION PHASE II 15,000,000 6 (H) CONSTRUCTION, ACQUISITION, 7 INFRASTRUCTURE, REDEVELOPMENT, 8 ABATEMENT OF HAZARDOUS MATERIALS AND 9 OTHER COSTS RELATED TO HANOVER 10 INDUSTRIAL ESTATES 1,000,000 11 (I) ACQUISITION, CONSTRUCTION, 12 INFRASTRUCTURE AND OTHER RELATED COSTS 13 FOR A MIXED-USE FACILITY AT THE MURRAY 14 COMPLEX 10,000,000 15 (J) CONSTRUCTION, INFRASTRUCTURE AND OTHER 16 RELATED COSTS FOR THE COAL STREET PARK 17 OFFICE COMPLEX 7,000,000 18 (K) ACQUISITION, CONSTRUCTION, 19 INFRASTRUCTURE AND OTHER RELATED COSTS 20 FOR AN INTERMODAL TRANSPORTATION 21 FACILITY 4,000,000 22 (L) CONSTRUCTION, INFRASTRUCTURE AND OTHER 23 RELATED COSTS FOR THE COAL STREET PARK 24 REGIONAL SPORTS COMPLEX 8,000,000 25 (M) CONSTRUCTION AND OTHER RELATED COSTS 26 FOR THE REDEVELOPMENT OF THE MURRAY 27 COURTWRIGHT COMPLEX 5,000,000 28 (N) CONSTRUCTION, ACQUISITION, 29 INFRASTRUCTURE, REDEVELOPMENT, 30 ABATEMENT OF HAZARDOUS MATERIALS AND 20070H1589B2107 - 67 -
1 OTHER ASSOCIATED WITH THE WEST MARKET 2 STREET MIXED-USE REVITALIZATION 3 PROJECT 5,000,000 4 (V) HANOVER TOWNSHIP 5 (A) CONSTRUCTION, ACQUISITION, 6 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 7 COSTS RELATED TO HANOVER CROSSINGS 8 PHASE III AND IV 4,000,000 9 (B) ACQUISITION, CONSTRUCTION, 10 INFRASTRUCTURE AND OTHER RELATED COSTS 11 FOR HANOVER CROSSINGS PHASE III AND IV 4,000,000 12 (VI) HAZLE TOWNSHIP 13 (A) ACQUISITION, CONSTRUCTION, 14 INFRASTRUCTURE AND OTHER RELATED COSTS 15 FOR THE DEVELOPMENT OF A CARGO AIRPORT 250,000,000 16 (VII) KINGSTON BOROUGH 17 (A) CONSTRUCTION AND OTHER RELATED COSTS 18 FOR THE HOYT LIBRARY CONSTRUCTION 19 PROJECT 1,500,000 20 (VIII) WILKES-BARRE TOWNSHIP 21 (A) CONSTRUCTION AND OTHER RELATED COSTS 22 FOR THE RENOVATION OF THE TOWNSHIP 23 MUNICIPAL BUILDING 500,000 24 (B) CONSTRUCTION AND OTHER RELATED COSTS 25 FOR THE TOWNSHIP POLICE BUILDING 800,000 26 (IX) WRIGHT TOWNSHIP 27 (A) CONSTRUCTION, INFRASTRUCTURE, 28 ABATEMENT OF HAZARDOUS MATERIALS, 29 REDEVELOPMENT AND OTHER COSTS RELATED 30 TO CRESTWOOD INDUSTRIAL PARK 2,500,000 20070H1589B2107 - 68 -
1 (B) ACQUISITION, CONSTRUCTION, 2 INFRASTRUCTURE AND OTHER RELATED COSTS 3 FOR CRESTWOOD INDUSTRIAL PARK 1,500,000 4 (41) LYCOMING COUNTY (RESERVED) 5 (42) MCKEAN COUNTY (RESERVED) 6 (43) MERCER COUNTY 7 (I) COUNTY PROJECTS (RESERVED) 8 (II) CITY OF SHARON 9 (A) ACQUISITION, CONSTRUCTION, 10 INFRASTRUCTURE AND OTHER RELATED COSTS 11 FOR DOWNTOWN SHARON REVITALIZATION 3,000,000 12 (III) CITY OF HERMITAGE 13 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 14 COSTS ASSOCIATED WITH THE BUHL PARK 15 COMMUNITY CENTER RENOVATION 1,500,000 16 (44) MIFFLIN COUNTY (RESERVED) 17 (45) MONROE COUNTY 18 (I) COUNTY PROJECTS (RESERVED) 19 (II) EAST STROUDSBURG BOROUGH 20 (A) INFRASTRUCTURE AND OTHER RELATED COSTS 21 TO RENOVATE EAST STROUDSBURG HIGH 22 SCHOOL MEMORIAL STADIUM 3,000,000 23 (B) CONSTRUCTION, ACQUISITION, 24 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 25 COSTS RELATED TO THE POCONO MOUNTAINS 26 REGIONAL CONVENTION CENTER 37,500,000 27 (46) MONTGOMERY COUNTY 28 (I) COUNTY PROJECTS (RESERVED) 29 (II) ABINGTON TOWNSHIP 30 (A) ACQUISITION, CONSTRUCTION AND OTHER 20070H1589B2107 - 69 -
1 RELATED COSTS FOR THE RENOVATION OF THE 2 ABINGTON COMMUNITY CENTER 1,000,000 3 (B) ACQUISITION, CONSTRUCTION AND OTHER 4 RELATED COSTS TO DEVELOP A CIVIC 5 FACILITY AS PART OF THE ROSLYN 6 REDEVELOPMENT PROGRAM 12,000,000 7 (C) CONSTRUCTION AND OTHER RELATED COSTS 8 FOR THE RENOVATION OF THE ARDSLEY 9 COMMUNITY CENTER 1,000,000 10 (III) AMBLER BOROUGH 11 (A) CONSTRUCTION AND OTHER RELATED COSTS 12 FOR THE REDEVELOPMENT OF MAIN STREET 10,000,000 13 (IV) JENKINTOWN BOROUGH 14 (A) CONSTRUCTION AND OTHER RELATED COSTS 15 FOR THE SOUTHERN GATEWAY MULTILEVEL 16 PARKING GARAGE 6,000,000 17 (47) MONTOUR COUNTY (RESERVED) 18 (48) NORTHAMPTON COUNTY 19 (I) COUNTY PROJECTS 20 (A) CONSTRUCTION, REDEVELOPMENT AND OTHER 21 RELATED COSTS TO BUILD THE STEELSAX 22 PERFORMING ARTS AND BROADCAST 23 CENTER/EVENTS CENTER 12,000,000 24 (II) PALMER TOWNSHIP 25 (A) ACQUISITION, CONSTRUCTION AND OTHER 26 RELATED COSTS FOR THE NATIONAL HIGH 27 SCHOOL SPORTS HALL OF FAME MUSEUM 5,000,000 28 (49) NORTHUMBERLAND COUNTY 29 (I) POINT TOWNSHIP 30 (A) CONSTRUCTION AND OTHER RELATED COSTS 20070H1589B2107 - 70 -
1 FOR THE SUNPOINT RENEWABLE ENERGY 2 PROJECT 1,000,000 3 (50) PERRY COUNTY (RESERVED) 4 (51) PHILADELPHIA COUNTY 5 (I) COUNTY PROJECTS 6 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 7 RELATED COSTS FOR THE EXPANSION AND 8 REHABILITATION OF CHILDREN'S CRISIS 9 TREATMENT CENTER 4,000,000 10 (II) CITY OF PHILADELPHIA 11 (A) CONSTRUCTION AND OTHER RELATED COSTS 12 FOR THE UNIVERSITY OF PENNSYLVANIA 13 RESEARCH CENTER 16,000,000 14 (B) REDEVELOPMENT AND OTHER COSTS RELATED 15 TO THE INTER-COMMUNITY DEVELOPMENT 16 CORPORATION NORTHWEST NEIGHBORHOOD 17 STREETSCAPE IMPROVEMENTS 1,500,000 18 (C) CONSTRUCTION, REDEVELOPMENT AND OTHER 19 COSTS ASSOCIATED WITH THE ACADEMY OF 20 NATURAL SCIENCE EXHIBIT 500,000 21 (D) CONSTRUCTION, INFRASTRUCTURE, 22 REDEVELOPMENT AND OTHER RELATED COSTS 23 TO UPGRADE AND RENOVATE THE CURTIS 24 INSTITUTE FOR MUSIC 20,000,000 25 (E) CONSTRUCTION AND OTHER RELATED COSTS 26 FOR THE NUEVA JERUSALEM MIXED-USE 27 FACILITY 1,500,000 28 (F) CONSTRUCTION, INFRASTRUCTURE AND OTHER 29 RELATED COSTS FOR THE PASTORE UNIDOS 30 POR FILADELFIA PROJECT RELATED TO 20070H1589B2107 - 71 -
1 MINORITY AND SENIOR PROGRAMMING 500,000 2 (G) CONSTRUCTION AND OTHER RELATED COSTS 3 FOR THE RENOVATION AND EXPANSION OF THE 4 COLUMBIA NORTH COMMUNITY YMCA 3,600,000 5 (H) CONSTRUCTION, INFRASTRUCTURE AND OTHER 6 RELATED COSTS FOR THE BETSY ROSS HOUSE 500,000 7 (I) INFRASTRUCTURE AND OTHER COSTS RELATED 8 TO THE HUNTING PARK 21ST CENTURY 9 COMMUNITY AND LEARNING CENTER 1,000,000 10 (J) CONSTRUCTION, INFRASTRUCTURE AND OTHER 11 RELATED COSTS FOR THE STENTON SERVICE 12 WING RESTORATION PROJECT 1,000,000 13 (K) CONSTRUCTION, REDEVELOPMENT AND OTHER 14 COSTS RELATED TO THE NEW PLEASANT 15 PLAYGROUND BUILDING 1,000,000 16 (L) CONSTRUCTION, ACQUISITION, DEMOLITION 17 AND OTHER COSTS ASSOCIATED WITH SOUTH 18 PHILADELPHIA SERVICE HOUSING 10,000,000 19 (M) CONSTRUCTION AND OTHER RELATED COSTS 20 FOR THE RENOVATION OF INTERNATIONAL 21 HOUSE 8,000,000 22 (N) ACQUISITION, CONSTRUCTION AND OTHER 23 RELATED COSTS FOR THE REDEVELOPMENT OF 24 THE HISTORIC JOHN GRASS COMPANY 25 BUILDING 700,000 26 (O) CONSTRUCTION, INFRASTRUCTURE AND OTHER 27 RELATED COSTS FOR THE NORRIS SQUARE 28 CHILDREN'S CENTER 500,000 29 (P) CONSTRUCTION AND OTHER RELATED COSTS 30 FOR NORTH PHILADELPHIA RETAIL 20070H1589B2107 - 72 -
1 CORRIDORS 4,000,000 2 (Q) CONSTRUCTION, INFRASTRUCTURE AND OTHER 3 RELATED COSTS FOR A REGIONAL EMERGENCY 4 SERVICES FACILITY 30,000,000 5 (R) CONSTRUCTION, INFRASTRUCTURE AND OTHER 6 RELATED COSTS FOR NORTH PHILADELPHIA 7 RECREATION 5,000,000 8 (S) ACQUISITION, CONSTRUCTION AND OTHER 9 RELATED COSTS FOR THE PHILADELPHIA 10 POLYTECHNIC CHARTER HIGH SCHOOL 10,000,000 11 (T) CONSTRUCTION AND OTHER RELATED COSTS 12 FOR THE DEVELOPMENT OF A SKATE PARK AT 13 PAINE PARK 2,750,000 14 (U) CONSTRUCTION AND OTHER RELATED COSTS 15 FOR IMPROVEMENTS TO THE FRIENDS HOUSING 16 COOPERATIVE FOUNDATION FACILITIES 250,000 17 (V) ACQUISITION, CONSTRUCTION, 18 INFRASTRUCTURE AND OTHER RELATED COSTS 19 FOR CHESTER AVENUE REVITALIZATION 1,000,000 20 (W) ACQUISITION, CONSTRUCTION, 21 INFRASTRUCTURE AND OTHER RELATED COSTS 22 TO REVITALIZE THE MARKET STREET 23 CORRIDOR, INCLUDING ADJACENT AREAS 30,000,000 24 (52) PIKE COUNTY 25 (I) COUNTY PROJECTS (RESERVED) 26 (II) LEHMAN TOWNSHIP 27 (A) REDEVELOPMENT AND OTHER COSTS RELATED 28 TO THE COMPLETION AND CAPITAL 29 IMPROVEMENTS TO MOUNTAIN LAUREL CENTER 30 FOR THE PERFORMING ARTS 600,000 20070H1589B2107 - 73 -
1 (53) POTTER COUNTY (RESERVED) 2 (54) SCHUYLKILL COUNTY (RESERVED) 3 (55) SNYDER COUNTY(RESERVED 4 (56) SOMERSET COUNTY (RESERVED) 5 (57) SULLIVAN COUNTY (RESERVED) 6 (58) SUSQUEHANNA COUNTY (RESERVED) 7 (59) TIOGA COUNTY (RESERVED) 8 (60) UNION COUNTY (RESERVED) 9 (61) VENANGO COUNTY (RESERVED) 10 (62) WARREN COUNTY (RESERVED) 11 (63) WASHINGTON COUNTY 12 (I) COUNTY PROJECTS (RESERVED) 13 (II) ALLENPORT BOROUGH 14 (A) ACQUISITION, CONSTRUCTION, 15 INFRASTRUCTURE AND OTHER RELATED COSTS 16 TO RESTORE THE BARGE SHIPPING FACILITY 1,250,000 17 (III) CALIFORNIA BOROUGH 18 (A) ACQUISITION, CONSTRUCTION, 19 INFRASTRUCTURE AND OTHER RELATED COSTS 20 FOR THE CALIFORNIA TECHNOLOGY PARK FILM 21 INDUSTRY PROJECT 1,250,000 22 (IV) CANONSBURG BOROUGH 23 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 24 RELATED COSTS FOR THE TOWN PARK 25 PROJECT 940,000 26 (V) CARROLL TOWNSHIP 27 (A) CONSTRUCTION AND OTHER RELATED COSTS 28 FOR THE MONONGAHELA VALLEY HOSPITAL 29 UPGRADE PROJECT 3,000,000 30 (VI) CECIL TOWNSHIP 20070H1589B2107 - 74 -
1 (A) CONSTRUCTION AND DEVELOPMENT OF 2 RECREATION COMPLEX NEAR MUSE SCHOOL 3 PROPERTY 500,000 4 (VII) CHARTIERS TOWNSHIP 5 (A) CONSTRUCTION AND OTHER RELATED COSTS 6 FOR THE CHARTIERS TOWNSHIP COMMUNITY 7 CENTER 500,000 8 (B) LAND ACQUISITION AND DEVELOPMENT OF 9 CHARTIERS TOWNSHIP RECREATION COMPLEX 5,000,000 10 (VIII) CITY OF WASHINGTON 11 (A) CONSTRUCTION AND OTHER RELATED COSTS 12 FOR THE CROSSROADS AMPHITHEATER 1,000,000 13 (B) CONSTRUCTION AND OTHER RELATED COSTS 14 FOR THE REDEVELOPMENT OF MAIN AND 15 MAIDEN STREETS 15,000,000 16 (C) IMPROVEMENTS TO THE WASHINGTON PARK 17 RECREATION FACILITY 1,250,000 18 (D) CONSTRUCTION AND OTHER RELATED COSTS 19 FOR THE MAIN STREET WORKS PROJECT 12,500,000 20 (E) ACQUISITION OF LAND AND CONSTRUCTION 21 OF A POLICE/FIRE SAFETY BUILDING 22 COMPLEX 3,000,000 23 (IX) CROSS CREEK TOWNSHIP 24 (A) CONSTRUCTION AND OTHER RELATED COSTS 25 FOR THE CEDAR GROVE 26 COMMUNITY/RECREATION PROJECT 500,000 27 (X) FALLOWFIELD TOWNSHIP 28 (A) CONSTRUCTION, INFRASTRUCTURE, 29 ACQUISITION AND OTHER COSTS RELATED TO 30 THE SHELL BUILDING AND SUPPORTING 20070H1589B2107 - 75 -
1 INFRASTRUCTURE IN ALTA VISTA BUSINESS 2 PARK 1,250,000 3 (XI) MOUNT PLEASANT TOWNSHIP 4 (A) CONSTRUCTION AND OTHER RELATED COSTS 5 FOR THE HICKORY MAIN STREET 6 REVITALIZATION 500,000 7 (XII) NORTH FRANKLIN TOWNSHIP 8 (A) CONSTRUCTION AND OTHER RELATED COSTS 9 FOR A NEW MUNICIPAL OFFICE/COMMUNITY 10 BUILDING 3,000,000 11 (XIII) NORTH STRABANE TOWNSHIP 12 (A) CONSTRUCTION AND OTHER RELATED COSTS 13 FOR THE NORTH STRABANE TOWNSHIP 14 COMMUNITY/RECREATION CENTER 1,000,000 15 (XIV) ROSCOE BOROUGH 16 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 17 RELATED COSTS FOR COMMUNITY PARK 18 IMPROVEMENTS 500,000 19 (XV) SOUTH STRABANE TOWNSHIP 20 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 21 RELATED COSTS FOR THE ZEDIKER STATION 22 BUSINESS PARK 5,000,000 23 (B) CONSTRUCTION AND OTHER RELATED COSTS 24 FOR A POLICE AND ROAD DEPARTMENT 25 FACILITY 875,000 26 (XVI) UNION TOWNSHIP 27 (A) INFRASTRUCTURE, REDEVELOPMENT, 28 ABATEMENT OF HAZARDOUS MATERIALS AND 29 OTHER COSTS RELATED TO THE PHOENIX 30 BUSINESS PARK 1,000,000 20070H1589B2107 - 76 -
1 (B) PHOENIX BUSINESS PARK, ENVIRONMENTAL 2 REMEDIATION, SITE PREPARATION AND 3 INFRASTRUCTURE FOR DEVELOPMENT OF A 58- 4 ACRE BUSINESS PARK 1,000,000 5 (XVII) WASHINGTON BOROUGH 6 (A) CONSTRUCTION, INFRASTRUCTURE, 7 ACQUISITION AND OTHER RELATED COSTS TO 8 BUILD A WASHINGTON COMMUNITY HEALTH 9 CENTER 1,500,000 10 (65) WESTMORELAND COUNTY 11 (I) COUNTY PROJECTS (RESERVED) 12 (II) CITY OF GREENSBURG 13 (A) CONSTRUCTION AND OTHER COSTS RELATED 14 TO CONSTRUCTION OF AN ADDITION TO THE 15 SETON HILL UNIVERSITY LYNCH SCIENCE 16 HALL 15,000,000 17 (B) ACQUISITION, CONSTRUCTION, 18 INFRASTRUCTURE AND OTHER RELATED COSTS 19 FOR GREENSBURG DOWNTOWN REVITALIZATION 5,000,000 20 (C) ACQUISITION, CONSTRUCTION, 21 INFRASTRUCTURE AND OTHER RELATED COSTS 22 FOR THE WESTMORELAND COUNTY COMMUNITY 23 COLLEGE SPORTS AND RECREATION FACILITY 6,000,000 24 (III) LATROBE BOROUGH 25 (A) RENOVATION AND EXPANSION OF ST. 26 VINCENT COLLEGE FACILITIES 15,000,000 27 (B) CONSTRUCTION AND OTHER RELATED COSTS 28 FOR THE ST. VINCENT COLLEGE, SCHOOL OF 29 SCIENCE 15,000,000 30 (IV) NEW KINGSTON 20070H1589B2107 - 77 -
1 (A) CONSTRUCTION AND OTHER RELATED COSTS 2 FOR THE ALLE-KISKI EDUCATION CENTER 2,500,000 3 (V) UPPER BURRELL TOWNSHIP 4 (A) ACQUISITION, CONSTRUCTION, 5 INFRASTRUCTURE AND OTHER RELATED COSTS 6 OF A MANUFACTURING CAMPUS 5,000,000 7 (VI) YOUNGWOOD BOROUGH 8 (A) CONSTRUCTION, REDEVELOPMENT AND OTHER 9 COSTS RELATED TO THE RENOVATION OF THE 10 WESTMORELAND COUNTY COMMUNITY COLLEGE 11 BASEBALL STADIUM 2,500,000 12 (66) WYOMING COUNTY (RESERVED) 13 (67) YORK COUNTY 14 (I) COUNTY PROJECTS (RESERVED) 15 (II) CITY OF YORK 16 (A) CONSTRUCTION, INFRASTRUCTURE, 17 ABATEMENT OF HAZARDOUS MATERIALS AND 18 OTHER COSTS RELATED TO THE GOVERNMENT 19 CENTER RENOVATION PROJECT 8,500,000 20 (B) ACQUISITION, CONSTRUCTION, 21 INFRASTRUCTURE AND OTHER RELATED COSTS 22 FOR DOWNTOWN COMMUNITY COLLEGE CAMPUS 7,000,000 23 (C) CONSTRUCTION, ACQUISITION, 24 REDEVELOPMENT, ABATEMENT OF HAZARDOUS 25 MATERIALS AND OTHER COSTS RELATED TO 26 THE DOWNTOWN YORK HISTORIC PRESERVATION 27 AND REVITALIZATION PROJECT 9,000,000 28 (III) SPRINGETTSBURY TOWNSHIP 29 (A) CONSTRUCTION, INFRASTRUCTURE, 30 ABATEMENT OF HAZARDOUS MATERIALS AND 20070H1589B2107 - 78 -
1 OTHER COSTS ASSOCIATED WITH THE 2 PLEASANT ACRES RENOVATION PROJECT 11,250,000 3 Section 7. Itemization of flood control projects. 4 Additional capital projects in the category of 5 flood control projects to be constructed by the 6 Department of Environmental Protection, its 7 successors or assigns, and to be financed by the 8 incurring of debt are hereby itemized, together 9 with their respective estimated costs, as follows: 10 Total 11 Project 12 Project Allocation 13 (1) Department of Environmental Protection 14 (i) Crawford County 15 (A) Conneautville Dam rehabilitation 750,000 16 (ii) Monroe County 17 (A) Additional funds to refurbish Brady's 18 Lake Dam in order to rebid the project 19 due to delays and poor performance in 20 concrete mix design 3,600,000 21 Section 8. Itemization of Keystone Recreation, Park and 22 Conservation Fund projects. 23 Projects in the category of public improvement projects to be 24 constructed by the Department of Conservation and Natural 25 Resources, its successors or assigns, and to be financed by 26 current revenues of the Keystone Recreation, Park and 27 Conservation Fund are hereby itemized, together with their 28 respective estimated costs, as follows: 29 Total 30 Project 20070H1589B2107 - 79 -
1 Project Allocation 2 (1) Department of Conservation and Natural 3 Resources 4 (i) Black Moshannon State Park 5 (A) Rehabilitate dam spillway and boat 6 launch 400,000 7 (Base Project Allocation - $400,000) 8 (ii) Blue Knob State Park 9 (A) Rehabilitate park facilities 900,000 10 (Base Project Allocation - $900,000) 11 (B) Rehabilitate day use area 1,000,000 12 (Base Project Allocation - $1,000,000) 13 (iii) Caledonia State Park 14 (A) Replace two bridges on main park road 600,000 15 (Base Project Allocation - $600,000) 16 (B) Rehabilitate park campgrounds 1,100,000 17 (Base Project Allocation - $1,100,000) 18 (iv) Codorus State Park 19 (A) Provide paving in park 350,000 20 (Base Project Allocation - $350,000) 21 (v) Denton Hill State Park 22 (A) Replace main park road/parking area 400,000 23 (Base Project Allocation - $400,000) 24 (vi) Forest District 19 25 (A) Rehabilitate Egypt Meadows Dam 750,000 26 (Base Project Allocation - $750,000) 27 (vii) Forest District 20 28 (A) Provide new resource management 29 center 4,000,000 30 (Base Project Allocation - $4,000,000) 20070H1589B2107 - 80 -
1 (viii) Little Pine State Park 2 (A) Renovate restroom and lower picnic 3 area 300,000 4 (Base Project Allocation - $300,000) 5 (ix) Moshannon State Forest 6 (A) Provide cleanup to Quehanna reactor 7 site 2,400,000 8 (Base Project Allocation - $2,400,000) 9 (x) Prince Gallitzin State Park 10 (A) Replace two restrooms at the park 300,000 11 (Base Project Allocation - $300,000) 12 (B) Pave roads within the park 350,000 13 (Base Project Allocation - $350,000) 14 (xi) Reeds Gap State Park 15 (A) Relocate park office building 1,500,000 16 (Base Project Allocation - $1,500,000) 17 (B) Replace existing swimming pool 1,000,000 18 (Base Project Allocation - $1,000,000) 19 (xii) S.B. Elliott State Park 20 (A) Provide ADA cabins and renovate 21 washhouse 1,250,000 22 (Base Project Allocation - $1,250,000) 23 (xiii) Shawnee State Park 24 (A) Repair joints in concrete spillway 300,000 25 (Base Project Allocation - $300,000) 26 (xiv) Shikellamy State Park 27 (A) Project (PW 4182) to provide dock 28 rehabilitation transient and launch 29 areas 663,000 30 (Base Project Allocation - $663,000) 20070H1589B2107 - 81 -
1 (B) Renovate overlook road in the park 400,000 2 (Base Project Allocation - $400,000) 3 (xv) Sinnemahoning State Park 4 (A) Repair dam spillway 650,000 5 (Base Project Allocation - $650,000) 6 (xvi) Various Parks and Forest Districts, 7 Statewide 8 (A) Acquire land to be incorporated within 9 the park system according to the 10 Commonwealth's master plan 10,000,000 11 (Land Allocation - $10,000,000) 12 Section 9. Itemization of Environmental Stewardship Fund 13 projects. 14 Projects in the category of public improvement projects to be 15 constructed by the Department of Conservation and Natural 16 Resources, its successors or assigns and to be financed by 17 current revenues of the Environmental Stewardship Fund are 18 hereby itemized together with their respective estimated 19 financial costs as follows: 20 Total 21 Project 22 Project Allocation 23 (1) Department of Conservation and Natural 24 Resources 25 (i) Bald Eagle State Park 26 (A) Rehabilitate roads within the park 1,600,000 27 (Base Project Allocation - $1,600,000) 28 (B) Replace courtesy docks at eight public 29 boat launches 300,000 30 (Base Project Allocation - $300,000) 20070H1589B2107 - 82 -
1 (C) Rehabilitate office and visitors' 2 center 1,750,000 3 (Base Project Allocation - $1,750,000) 4 (ii) Beltzville State Park 5 (A) Rehabilitate sewage treatment plant 6 and correct sewer line infiltration 400,000 7 (Base Project Allocation - $400,000) 8 (iii) Bendigo State Park 9 (A) Replace bathhouse, lifeguard station 10 and day use restrooms in the park 1,000,000 11 (Base Project Allocation - $1,000,000) 12 (iv) Canoe Creek State Park 13 (A) Rehabilitate sewage treatment plant 300,000 14 (Base Project Allocation - $300,000) 15 (v) Chapman State Park 16 (A) Rehabilitate beach house and comfort 17 station 1,900,000 18 (Base Project Allocation - $1,900,000) 19 (vi) Cherry Springs State Park 20 (A) Replace pit latrines with flush 21 restrooms and sewers 770,000 22 (Base Project Allocation - $770,000) 23 (vii) Clear Creek State Park 24 (A) Rehabilitate water system and replace 25 pit latrines 2,000,000 26 (Base Project Allocation - $2,000,000) 27 (B) Rehabilitate park roads and bridges 1,500,000 28 (Base Project Allocation - $1,500,000) 29 (viii) Colonel Denning State Park 30 (A) Provide new day restroom, sewage and 20070H1589B2107 - 83 -
1 shower house 350,000 2 (Base Project Allocation - $350,000) 3 (B) Provide bathhouse, concession, 4 restroom and sewage 500,000 5 (Base Project Allocation - $500,000) 6 (ix) Cook Forest State Park 7 (A) Rehabilitation of trail, Phase II 250,000 8 (Base Project Allocation - $250,000) 9 (B) Rehabilitate five campground 10 washhouses 600,000 11 (Base Project Allocation - $600,000) 12 (C) Replace park office and visitors' 13 center 2,000,000 14 (Base Project Allocation - $2,000,000) 15 (D) Replace six river cabins 2,200,000 16 (Base Project Allocation - $2,200,000) 17 (E) Rehabilitate sewage system and 18 repairs 750,000 19 (Base Project Allocation - $750,000) 20 (F) Provide repairs to the water system 750,000 21 (Base Project Allocation - $750,000) 22 (G) Rehabilitate road and parking lot 1,100,000 23 (Base Project Allocation - $1,100,000) 24 (x) Colton Point State Park 25 (A) Replace two pit latrines with 26 composting restroom, playground, picnic 27 area and campground shower house 1,500,000 28 (Base Project Allocation - $1,500,000) 29 (xi) Elk State Park 30 (A) Replace comfort station 150,000 20070H1589B2107 - 84 -
1 (Base Project Allocation - $150,000) 2 (xii) Erie Bluffs State Park 3 (A) Construct entrance to the park 300,000 4 (Base Project Allocation - $300,000) 5 (xiii) Evansburg State Park 6 (A) Provide road paving for the park 335,000 7 (Base Project Allocation - $335,000) 8 (B) Replace sewer lines 250,000 9 (Base Project Allocation - $250,000) 10 (C) Replace temporary restrooms, Phase II 250,000 11 (Base Project Allocation - $250,000) 12 (xiv) Forest District 2 13 (A) Construct new resource management 14 center 3,500,000 15 (Base Project Allocation - $3,500,000) 16 (xv) Forest District 3 17 (A) Establish new maintenance headquarter 18 buildings in Juniata, Mifflin and Perry 19 Counties 800,000 20 (Base Project Allocation - $800,000) 21 (B) Rehabilitate Gunter Valley Dam in 22 Perry County 5,000,000 23 (Base Project Allocation - $5,000,000) 24 (xvi) Forest District 4 25 (A) Rehabilitate Linn Run Road 2,500,000 26 (Base Project Allocation - $2,500,000) 27 (xvii) Forest District 5 28 (A) Rehabilitate resource management 29 center 1,500,000 30 (Base Project Allocation - $1,500,000) 20070H1589B2107 - 85 -
1 (xviii) Forest District 8 2 (A) Rehabilitate Kittanning Resource 3 Management Center 1,500,000 4 (Base Project Allocation - $1,500,000) 5 (xix) Forest District 14 6 (A) Rehabilitate historic stone house 250,000 7 (Base Project Allocation - $250,000) 8 (xx) Forest District 18 9 (A) SR 54 comfort station and parking 500,000 10 (Base Project Allocation - $500,000) 11 (B) New resource management center 3,500,000 12 (Base Project Allocation - $3,500,000) 13 (C) Rehabilitate Roaring Creek tract 14 facilities 600,000 15 (Base Project Allocation - $600,000) 16 (D) Rehabilitate Roaring Creek tract 17 trails and bridges 1,155,000 18 (Base Project Allocation - $1,155,000) 19 (E) Maintenance to Haldeman complex 300,000 20 (Base Project Allocation - $300,000) 21 (xxi) Forest District 19 22 (A) New resource management center 3,500,000 23 (Base Project Allocation - $3,500,000) 24 (B) Rehabilitate Little Summit Fire 25 Station maintenance complex 300,000 26 (Base Project Allocation - $300,000) 27 (C) Project for Pine Flats Road 200,000 28 (Base Project Allocation - $200,000) 29 (D) Project for Flat Ridge Road 200,000 30 (Base Project Allocation - $200,000) 20070H1589B2107 - 86 -
1 (xxii) Forest District 20 2 (A) Pave Dry Run Road 300,000 3 (Base Project Allocation - $300,000) 4 (B) Provide for Hillsgrove storage 5 building 300,000 6 (Base Project Allocation - $300,000) 7 (C) Pave High Knob Road 500,000 8 (Base Project Allocation - $500,000) 9 (xxiii) Frances Slocum State Park 10 (A) Rehabilitate sewage treatment plant 11 and lines 600,000 12 (Base Project Allocation - $600,000) 13 (xxiv) French Creek State Park 14 (A) Rehabilitate Scotts Run area 1,500,000 15 (Base Project Allocation - $1,500,000) 16 (xxv) Gifford Pinchot State Park 17 (A) Phase II rehabilitation of camp area 18 washhouse 400,000 19 (Base Project Allocation - $400,000) 20 (xxvi) Gouldsboro State Park 21 (A) Repair dam at the park 750,000 22 (Base Project Allocation - $750,000) 23 (B) Replace pit bathhouse, comfort station 24 and boat rental 600,000 25 (Base Project Allocation - $600,000) 26 (xxvii) Greenwood Furnace State Park 27 (A) Make repairs to sewage treatment 28 plant 900,000 29 (Base Project Allocation - $900,000) 30 (xxviii) Hickory Run State Park 20070H1589B2107 - 87 -
1 (A) Replace pit latrines and water tank 1,800,000 2 (Base Project Allocation - $1,800,000) 3 (B) Phase II of group camp roof 4 replacement 200,000 5 (Base Project Allocation - $200,000) 6 (C) Replace office and visitors' center 2,000,000 7 (Base Project Allocation - $2,000,000) 8 (D) Replace pit toilets and four 9 buildings 1,250,000 10 (Base Project Allocation - $1,250,000) 11 (xxix) Hills Creek State Park 12 (A) Rehabilitate spillway 600,000 13 (Base Project Allocation - $600,000) 14 (B) Provide office renovation addition and 15 visitors' center 2,100,000 16 (Base Project Allocation - $2,100,000) 17 (xxx) Hyner Run State Park 18 (A) Rehabilitate two park bridges and pave 19 roadway 600,000 20 (Base Project Allocation - $600,000) 21 (B) Replace two day use restrooms 300,000 22 (Base Project Allocation - $300,000) 23 (xxxi) Kettle Creek State Park 24 (A) Provide bathhouse, shower house and 25 sewage 1,800,000 26 (Base Project Allocation - $1,800,000) 27 (xxxii) Kooser State Park 28 (A) Rehabilitate park roads and bridges 1,300,000 29 (Base Project Allocation - $1,300,000) 30 (xxxiii) Lackawanna State Park 20070H1589B2107 - 88 -
1 (A) Replace park office 1,500,000 2 (Base Project Allocation - $1,500,000) 3 (B) Rehabilitate pool complex and day use 4 area 3,000,000 5 (Base Project Allocation - $3,000,000) 6 (xxxiv) Laurel Hill State Park 7 (A) Breach Spruce Run Dam 250,000 8 (Base Project Allocation - $250,000) 9 (B) Provide Jones Mill Run Dam dredging 250,000 10 (Base Project Allocation - $250,000) 11 (C) Rehabilitate group camp three sewage 12 lines 250,000 13 (Base Project Allocation - $250,000) 14 (D) Provide camping cottage shower house 15 at the park 650,000 16 (Base Project Allocation - $650,000) 17 (E) Rehabilitate contact station and 18 parking 500,000 19 (Base Project Allocation - $500,000) 20 (xxxv) Laurel Ridge State Park 21 (A) Replace turnpike trail bridge 22 superstructure 1,200,000 23 (Base Project Allocation - $1,200,000) 24 (xxxvi) Little Pine State Park 25 (A) Rehabilitate dam 500,000 26 (Base Project Allocation - $500,000) 27 (xxxvii) Lyman Run State Park 28 (A) Provide construction to the spillway 29 bridge 500,000 30 (Base Project Allocation - $500,000) 20070H1589B2107 - 89 -
1 (xxxviii) Marsh Creek State Park 2 (A) Pave all parking lots in the park 325,000 3 (Base Project Allocation - $325,000) 4 (B) Provide ADA office expansion 150,000 5 (Base Project Allocation - $150,000) 6 (xxxix) McConnells Mill State Park 7 (A) Rehabilitate the park road 275,000 8 (Base Project Allocation - $275,000) 9 (xl) Moraine State Park 10 (A) Resurface bike trail in park 1,200,000 11 (Base Project Allocation - $1,200,000) 12 (B) Rehabilitate Old 422 launch and road 1,000,000 13 (Base Project Allocation - $1,000,000) 14 (xli) Neshaminy State Park 15 (A) Rehabilitate jetty 350,000 16 (Base Project Allocation - $350,000) 17 (xlii) Nockamixon State Park 18 (A) Provide paving in the park 500,000 19 (Base Project Allocation - $500,000) 20 (B) Replace three pit toilets 1,000,000 21 (Base Project Allocation - $1,000,000) 22 (xliii) Ohiopyle State Park 23 (A) Rehabilitate residence 250,000 24 (Base Project Allocation - $250,000) 25 (B) Replace bridge 0902-CSX 2288 300,000 26 (Base Project Allocation - $300,000) 27 (C) Construct parking above new office 900,000 28 (Base Project Allocation - $900,000) 29 (D) Provide park office accessibility 2,000,000 30 (Base Project Allocation - $2,000,000) 20070H1589B2107 - 90 -
1 (E) Provide bathhouse, shower house and 2 sewage 275,000 3 (Base Project Allocation - $275,000) 4 (xliv) Oil Creek State Park 5 (A) Rehabilitate Boughton Bridge 400,000 6 (Base Project Allocation - $400,000) 7 (B) Phase I to repair trail slips 300,000 8 (Base Project Allocation - $300,000) 9 (xlv) Parker Dam State Park 10 (A) Rehabilitate dam spillway 350,000 11 (Base Project Allocation - $350,000) 12 (xlvi) Park Region 1 13 (A) Rehabilitate surface water 14 systems/filter 300,000 15 (Base Project Allocation - $300,000) 16 (B) Rehabilitate surface and well water 17 supplies in Region 1 State parks 1,500,000 18 (Base Project Allocation - $1,500,000) 19 (xlvii) Park Region 2 20 (A) Rehabilitate the residence 250,000 21 (Base Project Allocation - $250,000) 22 (xlviii) Pine Grove Furnace State Park 23 (A) Rehabilitate water treatment plant 2,000,000 24 (Base Project Allocation - $2,000,000) 25 (B) Rehabilitate various buildings 3,400,000 26 (Base Project Allocation - $3,400,000) 27 (xlix) Presque Isle State Park 28 (A) Provide bike trail extension to the 29 Tom Ridge Environmental Center 1,800,000 30 (Base Project Allocation - $1,800,000) 20070H1589B2107 - 91 -
1 (l) Prince Gallitzin State Park 2 (A) Rehabilitate sewage treatment plant 800,000 3 (Base Project Allocation - $800,000) 4 (B) Rehabilitate Beaver Valley Marina 2,900,000 5 (Base Project Allocation - $2,900,000) 6 (li) Promised Land State Park 7 (A) Rehabilitate sewer line 750,000 8 (Base Project Allocation - $750,000) 9 (B) Replace bridge and spillway 3,100,000 10 (Base Project Allocation - $3,100,000) 11 (C) Rehabilitate Pickerel Point and 12 Deerfield campgrounds 3,000,000 13 (Base Project Allocation - $3,000,000) 14 (D) Rehabilitate boat rental area 500,000 15 (Base Project Allocation - $500,000) 16 (E) Rehabilitate dump station 300,000 17 (Base Project Allocation - $300,000) 18 (F) Rehabilitate bridges 120,000 19 (Base Project Allocation - $120,000) 20 (lii) Pymatuning State Park 21 (A) Rehabilitate Espyville south launch 22 and environs 1,500,000 23 (Base Project Allocation - $1,500,000) 24 (B) Rehabilitate Jamestown beach house 650,000 25 (Base Project Allocation - $650,000) 26 (C) Rehabilitate sanitary facilities on 27 the west side 2,200,000 28 (Base Project Allocation - $2,200,000) 29 (liii) Raccoon Creek State Park 30 (A) Provide roadway slip repairs 800,000 20070H1589B2107 - 92 -
1 (Base Project Allocation - $800,000) 2 (B) Phase II rehabilitation of roads 300,000 3 (Base Project Allocation - $300,000) 4 (liv) Ralph Stover State Park 5 (A) Replace pit latrines and sewer 500,000 6 (Base Project Allocation - $500,000) 7 (lv) Ricketts Glen State Park 8 (A) Rehabilitate bathhouse and comfort 9 stations 2,800,000 10 (Base Project Allocation - $2,800,000) 11 (B) Rehabilitate roads and provide paving 12 for parking lots 650,000 13 (Base Project Allocation - $650,000) 14 (C) Replace pit latrine Route 118 picnic 15 area 400,000 16 (Base Project Allocation - $400,000) 17 (D) Repair infiltration, sewage treatment 18 plant and water system 550,000 19 (Base Project Allocation - $550,000) 20 (lvi) Ridley Creek State Park 21 (A) Reroof maintenance building 400,000 22 (Base Project Allocation - $400,000) 23 (B) Pave parking lot 300,000 24 (Base Project Allocation - $300,000) 25 (lvii) Salt Springs State Park 26 (A) Replace vault latrine 300,000 27 (Base Project Allocation - $300,000) 28 (lviii) Samuel S. Lewis State Park 29 (A) Provide two new comfort stations with 30 on-lot sewage 750,000 20070H1589B2107 - 93 -
1 (Base Project Allocation - $750,000) 2 (lix) Shawnee State Park 3 (A) Rehabilitate water treatment plant 1,200,000 4 (Base Project Allocation - $1,200,000) 5 (lx) Sinnemahoning State Park 6 (A) Rehabilitate main park road and 7 replace bridges 1,000,000 8 (Base Project Allocation - $1,000,000) 9 (lxi) Sizerville State Park 10 (A) Modernize pit latrines and bathhouse 2,000,000 11 (Base Project Allocation - $2,000,000) 12 (B) Provide new park office and visitors' 13 center 1,800,000 14 (Base Project Allocation - $1,800,000) 15 (lxii) Tiadaghton State Forest 16 (A) Construct Tiadaghton Management 17 Center 4,500,000 18 (Base Project Allocation - $4,500,000) 19 (lxiii) Tobyhanna State Park 20 (A) Rehabilitate day use area and 21 campground 2,500,000 22 (Base Project Allocation - $2,500,000) 23 (lxiv) Whipple Dam State Park 24 (A) Provide new multifunction beach 25 building 1,200,000 26 (Base Project Allocation - $1,200,000) 27 (lxv) Yellow Creek State Park 28 (A) Provide camping cottage shower house 650,000 29 (Base Project Allocation - $650,000) 30 (lxvi) White Clay Creek Preserve 20070H1589B2107 - 94 -
1 (A) Rebuild London Tract wall 150,000 2 (Base Project Allocation - $150,000) 3 (lxvii) Worlds End State Park 4 (A) Rehabilitate campground and day use 5 area roads 350,000 6 (Base Project Allocation - $350,000) 7 (lxviii) Various parks, Statewide 8 (A) Acquire land to be incorporated within 9 the park system according to the 10 Commonwealth's master plan 10,000,000 11 (Land Allocation - $10,000,000) 12 Section 10. Itemization of State forestry bridge projects. 13 Projects in the category of State forestry bridge projects to 14 be constructed by the Department of Conservation and Natural 15 Resources, its successors or assigns, and to be financed by oil 16 company franchise tax revenues pursuant to 75 Pa.C.S. § 17 9502(a)(2)(iv) (relating to imposition of tax) are hereby 18 itemized, together with their respective estimated costs, as 19 follows: 20 Total 21 Project 22 Project Allocation 23 (1) Centre County 24 (i) Forest District 9 25 (A) Project for Meyers Run Road and Black 26 Moshannon Creek 400,000 27 (B) Project for North Run Road over Smays 28 Run 300,000 29 (2) Clearfield County 30 (i) Forest District 9 20070H1589B2107 - 95 -
1 (A) Project for Shirks Road over Black 2 Moshannon Creek bridge No. 9-0028 300,000 3 (B) Project for Reservoir Road over Upper 4 Three Run 300,000 5 (C) Project for Little Medix Road over 6 Little Medix Run, bridge No. 9-0012 300,000 7 (3) Clinton County 8 (i) Forest District 10 9 (A) Project for Beaver Dam Road over 10 Beaver Dam Run 300,000 11 (B) Project for Birch Island Road over 12 Amos Branch, bridge No. 10-0040 300,000 13 (4) Elk County 14 (i) Forest District 13 15 (A) Project for East Hicks Road over Barr 16 Hollow 300,000 17 (B) Project for Little Dents Road over 18 Dents Run Bridge No. 13-0032 300,000 19 (C) Project for Dents Run Road over Little 20 Bear Run 300,000 21 (D) Project for Dents Run Road over 22 Weatherboard Run 300,000 23 (E) Project for bridge over North Fork 300,000 24 (5) Huntingdon County 25 (i) Forest District 5 26 (A) Project for Krise Valley Road bridge 300,000 27 (6) Lycoming County 28 (i) Forest District 12 29 (A) Project for Trout Run Road and 30 bridges 600,000 20070H1589B2107 - 96 -
1 (B) Project for Frances Road over unnamed 2 tributary near Black Forest Trail 300,000 3 (7) Perry County 4 (i) Forest District 3 5 (A) Project for the Second Narrows Road 6 bridge 300,000 7 (8) Tioga County 8 (i) Forest District 12 9 (A) Project for Francis Road over unnamed 10 tributary at Pipeline Road 300,000 11 (B) Project for Francis Road over Woodward 12 Hollow 300,000 13 (C) Project for Francis Road over Randall 14 Hollow bridge No. 12-9003 300,000 15 (D) Project for Francis Road over Kramer 16 Hollow bridge No. 12-9016 300,000 17 (E) Project for Francis Road over Francis 18 Branch bridge No. 12-0048 300,000 19 (ii) Forest District 16 20 (A) Project for Spoor Hollow Road over 21 Norris Brook bridge No. 16-0001 300,000 22 (B) Project for Cedar Mountain Road over 23 Cedar Run bridge No. 16-0014 300,000 24 (9) Union County 25 (i) Forest District 7 26 (A) Replace Brandon Road bridge 300,000 27 (B) Project for Cooper Mill Road bridge 300,000 28 (10) Clearfield and Elk Counties 29 (i) Forest District 9 30 (A) Project for three culverts on Little 20070H1589B2107 - 97 -
1 Medix Road over Little Medix Run 400,000 2 Section 11. Itemization of General Fund current revenue 3 projects. 4 The individual capital projects in the category of public 5 improvement projects to be constructed or acquired by the 6 Department of General Services, its successors or assigns, and 7 to be financed from General Fund current revenues, are hereby 8 itemized, together with their respective estimated financial 9 costs, as follows: 10 Total 11 Project 12 Project Allocation 13 (1) Department of Corrections 14 (i) State Correctional Institution at Laurel <-- 15 Highlands 16 (A) Lease and/or purchase an emergency 17 housing facility along with related 18 infrastructure improvements 2,500,000 19 (Base Project Allocation - $2,500,000) 20 (ii) State Correctional Institution at Pine 21 Grove 22 (A) Lease and/or purchase an emergency 23 housing facility along with related 24 infrastructure improvements 2,500,000 25 (Base Project Allocation - $2,500,000) 26 (iii) State Correctional Institution at 27 Retreat 28 (A) Lease and/or purchase an emergency 29 housing facility along with related 30 infrastructure improvements 2,500,000 20070H1589B2107 - 98 -
1 (Base Project Allocation - $2,500,000)
2 (I) STATE CORRECTIONAL INSTITUTION AT ALBION <--
3 (A) LEASE AND/OR PURCHASE AN EMERGENCY
4 HOUSING FACILITY ALONG WITH RELATED
5 INFRASTRUCTURE IMPROVEMENTS 2,000,000
6 (BASE PROJECT ALLOCATION - $2,000,000)
7 (II) STATE CORRECTIONAL INSTITUTION AT
8 CAMBRIDGE SPRINGS
9 (A) LEASE AND/OR PURCHASE AN EMERGENCY
10 HOUSING FACILITY ALONG WITH RELATED
11 INFRASTRUCTURE IMPROVEMENTS 2,000,000
12 (BASE PROJECT ALLOCATION - $2,000,000)
13 (III) STATE CORRECTIONAL INSTITUTION AT
14 GREENSBURG
15 (A) LEASE AND/OR PURCHASE AN EMERGENCY
16 HOUSING FACILITY ALONG WITH RELATED
17 INFRASTRUCTURE IMPROVEMENTS 2,000,000
18 (BASE PROJECT ALLOCATION - $2,000,000)
19 (IV) STATE CORRECTIONAL INSTITUTION AT
20 HOUTZDALE
21 (A) LEASE AND/OR PURCHASE AN EMERGENCY
22 HOUSING FACILITY ALONG WITH RELATED
23 INFRASTRUCTURE IMPROVEMENTS 2,000,000
24 (BASE PROJECT ALLOCATION - $2,000,000)
25 (V) STATE CORRECTIONAL INSTITUTION AT LAUREL
26 HIGHLANDS
27 (A) LEASE AND/OR PURCHASE TWO SEPARATE
28 EMERGENCY HOUSING FACILITIES ALONG WITH
29 RELATED INFRASTRUCTURE IMPROVEMENTS 4,000,000
30 (BASE PROJECT ALLOCATION - $4,000,000)
20070H1589B2107 - 99 -
1 (VI) STATE CORRECTIONAL INSTITUTION AT MAHANOY 2 (A) LEASE AND/OR PURCHASE AN EMERGENCY 3 HOUSING FACILITY ALONG WITH RELATED 4 INFRASTRUCTURE IMPROVEMENTS 2,000,000 5 (BASE PROJECT ALLOCATION - $2,000,000) 6 (VII) STATE CORRECTIONAL INSTITUTION AT MUNCY 7 (A) LEASE AND/OR PURCHASE TWO SEPARATE 8 EMERGENCY HOUSING FACILITIES ALONG WITH 9 RELATED INFRASTRUCTURE IMPROVEMENTS 4,000,000 10 (BASE PROJECT ALLOCATION - $4,000,000) 11 (VIII) STATE CORRECTIONAL INSTITUTION AT PINE 12 GROVE 13 (A) LEASE AND/OR PURCHASE AN EMERGENCY 14 HOUSING FACILITY ALONG WITH RELATED 15 INFRASTRUCTURE IMPROVEMENTS 2,000,000 16 (BASE PROJECT ALLOCATION - $2,000,000) 17 (IX) STATE CORRECTIONAL INSTITUTION AT RETREAT 18 (A) LEASE AND/OR PURCHASE AN EMERGENCY 19 HOUSING FACILITY ALONG WITH RELATED 20 INFRASTRUCTURE IMPROVEMENTS 3,500,000 21 (BASE PROJECT ALLOCATION - $3,500,000) 22 (X) STATE CORRECTIONAL INSTITUTION AT ROCKVIEW 23 (A) LEASE AND/OR PURCHASE AN EMERGENCY 24 HOUSING FACILITY ALONG WITH RELATED 25 INFRASTRUCTURE IMPROVEMENTS 2,000,000 26 (BASE PROJECT ALLOCATION - $2,000,000) 27 (2) Pennsylvania Historical and Museum Commission 28 (i) Pennsylvania Military Museum 29 (A) Design and construct a 2,500-square- 30 foot storage building for historical 20070H1589B2107 - 100 -
1 military vehicles 600,000 2 (Base Project Allocation - $500,000) 3 (Design and Contingencies - $100,000) 4 SECTION 11.1. ITEMIZATION OF MANUFACTURING FUND CURRENT REVENUE <-- 5 PROJECTS. 6 (A) PUBLIC IMPROVEMENT PROJECTS.--THE INDIVIDUAL CAPITAL 7 PROJECTS IN THE CATEGORY OF PUBLIC IMPROVEMENT PROJECTS TO BE 8 DEVELOPED BY THE DEPARTMENT OF GENERAL SERVICES, ITS SUCCESSORS 9 OR ASSIGNS, FOR THE DEPARTMENT OF CORRECTIONS AND TO BE FINANCED 10 FROM CURRENT REVENUES OF THE MANUFACTURING FUND ARE HEREBY 11 ITEMIZED TOGETHER WITH THEIR RESPECTIVE ITEMIZED COSTS AS 12 FOLLOWS: 13 TOTAL 14 PROJECT 15 PROJECT ALLOCATION 16 (1) DEPARTMENT OF CORRECTIONS 17 (I) STATE CORRECTIONAL INSTITUTION AT 18 FRACKVILLE 19 (A) MODIFY AN EXISTING BUILDING INTO A 20 REGIONAL LAUNDRY FACILITY FOR 21 CORRECTIONAL INDUSTRIES INCLUDING 22 LAUNDRY EQUIPMENT 3,000,000 23 (BASE PROJECT ALLOCATION - $3,000,000) 24 SECTION 11.2. LIMITED WAIVER OF LOCAL REQUIREMENTS. 25 THE LIMITATION ON DEPARTMENT OF TRANSPORTATION FUNDING OF 26 CAPITAL PROJECTS UNDER 74 PA.C.S. § 1302(4) (RELATING TO PROGRAM 27 AUTHORIZATIONS) SHALL BE TOTALLY WAIVED FOR THE CAPITAL PROJECTS 28 IN THE CATEGORY OF TRANSPORTATION ASSISTANCE PROJECTS FOR MASS 29 TRANSIT CONTAINED IN SECTION 5(A)(7.1)(IV) AND (V). 30 Section 12. Debt authorization. 20070H1589B2107 - 101 -
1 (a) Public improvements.--The Governor, Auditor General and 2 State Treasurer are hereby authorized and directed to borrow 3 from time to time in addition to any authorization heretofore or 4 hereafter enacted, on the credit of the Commonwealth, subject to 5 the limitations provided in the current capital budget, money 6 not exceeding in the aggregate the sum of $1,122,556,000 <-- 7 $1,295,541,000 as may be found necessary to carry out the <-- 8 acquisition and construction of the public improvement projects 9 specifically itemized in a capital budget. 10 (b) Furniture and equipment.--The Governor, Auditor General 11 and State Treasurer are hereby authorized and directed to borrow 12 from time to time in addition to any authorization heretofore or 13 hereafter enacted, on the credit of the Commonwealth, subject to 14 the limitations provided in the current capital budget, money 15 not exceeding in the aggregate the sum of $64,846,000 <-- 16 $81,346,000 as may be found necessary to carry out the <-- 17 acquisition and construction of the public improvement projects 18 consisting of the acquisition of original movable furniture and 19 equipment specifically itemized in a capital budget. 20 (c) Transportation assistance.--The Governor, Auditor 21 General and State Treasurer are hereby authorized and directed 22 to borrow from time to time in addition to any authorization 23 heretofore or hereafter enacted, on the credit of the 24 Commonwealth, subject to the limitations provided in the current 25 capital budget, money not exceeding in the aggregate the sum of 26 $47,148,000 $414,718,000 as may be found necessary to carry out <-- 27 the acquisition and construction of the transportation 28 assistance projects specifically itemized in a capital budget. 29 (d) (Reserved). <-- 30 (D) REDEVELOPMENT ASSISTANCE.--SUBJECT TO THE LIMITATION IN <-- 20070H1589B2107 - 102 -
1 SECTION 317(B) OF THE ACT OF FEBRUARY 9, 1999 (P.L.1, NO.1), 2 KNOWN AS THE CAPITAL FACILITIES DEBT ENABLING ACT, THE GOVERNOR, 3 AUDITOR GENERAL AND STATE TREASURER ARE HEREBY AUTHORIZED AND 4 DIRECTED TO BORROW FROM TIME TO TIME IN ADDITION TO ANY 5 AUTHORIZATION HERETOFORE OR HEREAFTER ENACTED, ON THE CREDIT OF 6 THE COMMONWEALTH, SUBJECT TO THE LIMITATIONS PROVIDED IN THE 7 CURRENT CAPITAL BUDGET, MONEY NOT EXCEEDING IN THE AGGREGATE THE 8 SUM OF $1,313,008,000 AS MAY BE FOUND NECESSARY TO CARRY OUT THE 9 REDEVELOPMENT ASSISTANCE AND THE REDEVELOPMENT ASSISTANCE 10 CAPITAL PROJECTS SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET. 11 (e) Flood control.--The Governor, Auditor General and State 12 Treasurer are hereby authorized and directed to borrow from time 13 to time in addition to any authorization heretofore or hereafter 14 enacted, on the credit of the Commonwealth, subject to the 15 limitations provided in the current capital budget, money not 16 exceeding in the aggregate the sum of $4,350,000 as may be found 17 necessary to carry out the acquisition and construction of the 18 flood control projects specifically itemized in a capital 19 budget. 20 Section 13. Issue of bonds. 21 The indebtedness authorized in this act shall be incurred 22 from time to time and shall be evidenced by one or more series 23 of general obligation bonds of the Commonwealth in such 24 aggregate principal amount for each series as the Governor, the 25 Auditor General and the State Treasurer shall determine, but the 26 latest stated maturity date shall not exceed the estimated 27 useful life of the projects being financed as stated in section 28 15. 29 Section 14. Estimated useful life and term of debt. 30 (a) Estimated useful life.--The General Assembly states that 20070H1589B2107 - 103 -
1 the estimated useful life of the public improvement projects 2 itemized in this act is as follows: 3 (1) Public improvement projects, 30 years. 4 (2) Furniture and equipment projects, 10 years. 5 (3) Transportation assistance projects: 6 (i) Rolling stock, 15 years. 7 (ii) Passenger buses, 12 years. 8 (iii) Furniture and equipment, 10 years. 9 (iv) All others, 30 years. 10 (b) Term of debt.--The maximum term of the debt authorized 11 to be incurred under this act is 30 years. 12 Section 15. Appropriations. 13 (a) Public improvements.--The net proceeds of the sale of 14 the obligations authorized in this act are hereby appropriated 15 from the Capital Facilities Fund to the Department of General 16 Services in the maximum amount of $1,122,556,000 $1,295,541,000 <-- 17 to be used by it exclusively to defray the financial cost of the 18 public improvement projects specifically itemized in a capital 19 budget. After reserving or paying the expenses of the sale of 20 the obligation, the State Treasurer shall pay to the Department 21 of General Services the moneys as required and certified by it 22 to be legally due and payable. 23 (b) Furniture and equipment.--The net proceeds of the sale 24 of the obligations authorized in this act are hereby 25 appropriated from the Capital Facilities Fund to the Department 26 of General Services in the maximum amount of $64,846,000 <-- 27 $81,346,000 to be used by it exclusively to defray the financial <-- 28 cost of the public improvement projects consisting of the 29 acquisition of original movable furniture and equipment 30 specifically itemized in a capital budget. After reserving or 20070H1589B2107 - 104 -
1 paying the expenses of the sale of the obligation, the State 2 Treasurer shall pay to the Department of General Services the 3 moneys as required and certified by it to be legally due and 4 payable. 5 (c) Transportation assistance.--The net proceeds of the sale 6 of the obligations authorized in this act are hereby 7 appropriated from the Capital Facilities Fund to the Department 8 of Transportation in the maximum amount of $47,148,000 <-- 9 $414,718,000 to be used by it exclusively to defray the <-- 10 financial cost of the transportation assistance projects 11 specifically itemized in a capital budget. After reserving or 12 paying the expenses of the sale of the obligation, the State 13 Treasurer shall pay to the Department of Transportation the 14 moneys as required and certified by it to be legally due and 15 payable. 16 (d) (Reserved). <-- 17 (D) REDEVELOPMENT ASSISTANCE.--THE NET PROCEEDS OF THE SALE <-- 18 OF THE OBLIGATIONS AUTHORIZED IN THIS ACT ARE HEREBY 19 APPROPRIATED FROM THE CAPITAL FACILITIES FUND TO THE DEPARTMENT 20 OF COMMUNITY AND ECONOMIC DEVELOPMENT IN THE MAXIMUM AMOUNT OF 21 $1,313,008,000 TO BE USED BY IT EXCLUSIVELY TO DEFRAY THE 22 FINANCIAL COST OF THE REDEVELOPMENT ASSISTANCE AND REDEVELOPMENT 23 ASSISTANCE CAPITAL PROJECTS SPECIFICALLY ITEMIZED IN A CAPITAL 24 BUDGET. AFTER RESERVING OR PAYING THE EXPENSES OF THE SALE OF 25 THE OBLIGATION, THE STATE TREASURER SHALL PAY TO THE DEPARTMENT 26 OF COMMUNITY AND ECONOMIC DEVELOPMENT THE MONEYS AS REQUIRED AND 27 CERTIFIED BY IT TO BE LEGALLY DUE AND PAYABLE. 28 (e) Flood control.--The net proceeds of the sale of the 29 obligations authorized in this act are hereby appropriated from 30 the Capital Facilities Fund to the Department of Environmental 20070H1589B2107 - 105 -
1 Protection in the maximum amount of $4,350,000 to be used by it 2 exclusively to defray the financial cost of the flood control 3 projects specifically itemized in a capital budget. After 4 reserving or paying the expenses of the sale of the obligation, 5 the State Treasurer shall pay to the Department of Environmental 6 Protection the moneys as required and certified by it to be 7 legally due and payable. 8 Section 16. Federal funds. 9 In addition to those funds appropriated in section 15, all 10 moneys received from the Federal Government for the projects 11 specifically itemized in this act are also hereby appropriated 12 for those projects. 13 Section 17. Delegation. 14 Notwithstanding any provision of law to the contrary, the 15 Department of General Services may delegate the design and 16 construction of the project contained in section 3(9)(iv)(A) to 17 Drexel University. 18 Section 18. Department of Corrections facilities. 19 (a) Preemption of local ordinances.--Capital projects in the 20 category of public improvement projects specifically itemized 21 for the Department of Corrections in section 3(4)(i), (iii), <-- 22 (v), (vi), (viii), (xii) and (xiii) are hereby authorized to be 23 FOR THE DEPARTMENT OF CORRECTIONS IN SECTION 3(4)(I), (III), <-- 24 (VI), (IX), (X)(B), (XI)(B), (XII)(B), (XIII), (XIV) AND (XV)(B) 25 OF THIS ACT ARE HEREBY AUTHORIZED TO BE constructed, erected or 26 acquired by the Department of General Services, its successors 27 or assigns, of the Department of Corrections, notwithstanding 28 any zoning ordinance, land use ordinance, building code or other 29 regulation adopted or enacted by a political subdivision under 30 the authority of any statute or under the authority of any home 20070H1589B2107 - 106 -
1 rule charter authorized and adopted under any statute or the 2 Constitution of Pennsylvania. 3 (b) Preemption of local ordinances for 2005-2006 projects.-- 4 Capital projects in the category of public improvement projects 5 specifically itemized for the Department of Corrections in 6 section 3(5)(iv.2)(A), (iv.4)(A) and (v.1)(A) of the act of July 7 7, 2006 (P.L.390, No.83), known as the Capital Budget Project 8 Itemization Act of 2005-2006, are hereby authorized to be 9 constructed, erected or acquired by the Department of General 10 Services, its successors or assigns, of the Department of 11 Corrections, notwithstanding any zoning ordinance, land use 12 ordinance, building code or other regulation adopted or enacted 13 by a political subdivision under the authority of any statute or 14 under the authority of any home rule charter authorized and 15 adopted under any statute or the Constitution of Pennsylvania. 16 (c) Preemption of local ordinances for 2001-2002 projects.-- 17 The capital projects in the category of public improvement 18 projects specifically itemized for the Department of Corrections 19 in section 3(4)(xi)(A) of the act of October 30, 2002 (P.L.891, 20 No.131), known as the Capital Budget Project Itemization Act of 21 2001-2002, are hereby authorized to be constructed, erected or 22 acquired by the Department of General Services, its successors 23 or assigns, of the Department of Corrections, notwithstanding 24 any zoning ordinance, land use ordinance, building code or other 25 regulation adopted or enacted by a political subdivision under 26 the authority of any statute or under the authority of any home 27 rule charter authorized and adopted under any statute or the 28 Constitution of Pennsylvania. 29 SECTION 19. SPECIAL CONTRACT PROVISIONS FOR DEPARTMENT OF <-- 30 CORRECTIONS PROJECTS. 20070H1589B2107 - 107 -
1 THE DEPARTMENT OF GENERAL SERVICES SHALL USE THE COMPETITIVE 2 SEALED PROPOSAL METHOD OF SOURCE SELECTION TO ENTER INTO A 3 DESIGN/BUILD CONTRACT FOR THE PROJECTS WHICH ARE AUTHORIZED IN 4 SECTION 3(4)(I), (III), (VI), (VIII), (IX), (X)(B), (XI)(B), 5 (XII)(B), (XIII), (XIV), (XV) AND SECTION 7(1). NOTWITHSTANDING 6 THE PROVISIONS OF 62 PA.C.S. § 322(6) (RELATING TO SPECIFIC 7 CONSTRUCTION POWERS, DUTIES AND PROCEDURES), THE DEPARTMENT OF 8 GENERAL SERVICES, UPON APPROVAL OF THE SECRETARY OF THE BUDGET, 9 MAY COMPLY WITH THE PROVISIONS OF THE ACT OF MAY 1, 1913 10 (P.L.155, NO.104), REFERRED TO AS THE SEPARATIONS ACT, BY 11 ENTERING INTO A DESIGN/BUILD CONTRACT WHICH REQUIRES THAT THE 12 DESIGN/BUILD CONTRACTOR COMPLY WITH THE REQUIREMENTS OF THE 13 SEPARATIONS ACT. ANY DEPARTMENT OF CORRECTIONS PROJECT WHICH IS 14 AUTHORIZED IN SECTION 3(4)(I), (III), (VI), (VIII), (IX), 15 (X)(B), (XI)(B), (XII)(B), (XIII), (XIV), (XV) OR SECTION 7(1) 16 SHALL BE EXEMPT FROM THE PROVISIONS OF THE ACT OF MARCH 3, 1978 17 (P.L.6, NO.3), KNOWN AS THE STEEL PRODUCTS PROCUREMENT ACT. THE 18 SECRETARY OF THE BUDGET SHALL GIVE NOTIFICATION OF ANY SUCH 19 DESIGN/BUILD CONTRACTS TO THE CHAIRMAN AND MINORITY CHAIRMAN OF 20 THE APPROPRIATIONS COMMITTEE OF THE SENATE AND THE CHAIRMAN AND 21 MINORITY CHAIRMAN OF THE APPROPRIATIONS COMMITTEE OF THE HOUSE 22 OF REPRESENTATIVES TEN DAYS PRIOR TO ADVERTISING FOR A 23 DEVELOPER. ANY DEPARTMENT OF CORRECTIONS PUBLIC IMPROVEMENT 24 PROJECT-ELIGIBLE EXPENDITURE OF FUNDS INCURRED PRIOR TO THE 25 EFFECTIVE DATE OF THIS ACT WHICH IS DIRECTLY RELATED TO A 26 PROJECT IMPROVEMENT CAPITAL PROJECT ITEMIZED IN SECTION 3(4)(I), 27 (III), (VI), (VIII), (IX), (X)(B), (XI)(B), (XII)(B), (XIII), 28 (XIV), (XV) OR SECTION 7(1) SHALL BE CONSIDERED ELIGIBLE TO BE 29 UTILIZED AS A PORTION OF THE EXPENDITURE OF FUNDS AND MAY BE 30 CONSIDERED AS ELIGIBLE FOR REIMBURSEMENT FROM CAPITAL FUNDS FOR 20070H1589B2107 - 108 -
1 A PROJECT IMPROVEMENT CAPITAL PROJECT ITEMIZED IN SECTION 2 3(4)(I), (III), (VI), (VIII), (IX), (X)(B), (XI)(B), (XII)(B), 3 (XIII), (XIV), (XV) OR SECTION 7(1). 4 SECTION 20. SPECIAL CONTRACT PROVISIONS FOR DEPARTMENT OF 5 CONSERVATION AND NATURAL RESOURCES PROJECTS. 6 (A) ANY DEPARTMENT OF CONSERVATION AND NATURAL RESOURCES 7 PUBLIC IMPROVEMENT PROJECT-ELIGIBLE EXPENDITURE OF FUNDS 8 INCURRED PRIOR TO THE EFFECTIVE DATE OF THIS ACT WHICH IS 9 DIRECTLY RELATED TO A PROJECT IMPROVEMENT CAPITAL PROJECT 10 ITEMIZED IN SECTION 3(3)(XXI) SHALL BE CONSIDERED ELIGIBLE TO BE 11 UTILIZED AS A PORTION OF THE EXPENDITURE OF FUNDS AND MAY BE 12 CONSIDERED AS ELIGIBLE FOR REIMBURSEMENT FROM CAPITAL FUNDS FOR 13 A PROJECT IMPROVEMENT CAPITAL PROJECT ITEMIZED IN SECTION 14 3(3)(XXI). 15 Section 19 21. Editorial changes. <-- 16 In editing and preparing this act for printing following the 17 final enactment, the Legislative Reference Bureau shall insert 18 or revise letters or numbers for projects where the letters or 19 numbers are missing or require revision. The bureau shall also 20 revise the total monetary amounts for the total authorization, 21 debt authorization, appropriations and departmental totals as 22 necessary to agree with the total monetary amounts of the 23 projects. 24 Section 20 22. Effective date. <-- 25 This act shall take effect July 1, 2007, or immediately, 26 whichever is later. D9L72RZ/20070H1589B2107 - 109 -