See other bills
under the
same topic
                                                      PRINTER'S NO. 1970

THE GENERAL ASSEMBLY OF PENNSYLVANIA


HOUSE BILL

No. 1589 Session of 2007


        INTRODUCED BY D. EVANS, JUNE 18, 2007

        REFERRED TO COMMITTEE ON APPROPRIATIONS, JUNE 18, 2007

                                     AN ACT

     1  Providing for the capital budget for the fiscal year 2007-2008;
     2     itemizing public improvement projects, furniture and
     3     equipment projects, transportation assistance projects,
     4     redevelopment assistance capital projects, flood control
     5     projects, Keystone Recreation, Park and Conservation Fund
     6     projects, Environmental Stewardship Fund projects, Motor
     7     License Fund projects, State forestry bridge projects and
     8     federally funded projects to be constructed or acquired or
     9     assisted by the Department of General Services, the
    10     Department of Community and Economic Development, the
    11     Department of Conservation and Natural Resources, the
    12     Department of Environmental Protection and the Department of
    13     Transportation, together with their estimated financial
    14     costs; authorizing the incurring of debt without the approval
    15     of the electors for the purpose of financing the projects to
    16     be constructed, acquired or assisted by the Department of
    17     General Services, the Department of Community and Economic
    18     Development, the Department of Conservation and Natural
    19     Resources, the Department of Environmental Protection or the
    20     Department of Transportation; stating the estimated useful
    21     life of the projects; providing an exemption; providing for
    22     limitation on certain capital projects, for special
    23     provisions for certain redevelopment assistance capital
    24     projects and for preemption of local ordinances for
    25     Department of Corrections projects; and making
    26     appropriations.

    27     The General Assembly of the Commonwealth of Pennsylvania
    28  hereby enacts as follows:
    29  Section 1.  Short title.


     1     This act shall be known and may be cited as the Capital
     2  Budget Project Itemization Act of 2007-2008.
     3  Section 2.  Total authorizations.
     4     (a)  Public improvements.--The total authorization for the
     5  additional capital projects in the category of public
     6  improvement projects itemized in section 3 and to be acquired or
     7  constructed by the Department of General Services, its
     8  successors or assigns and to be financed by the incurring of
     9  debt shall be $1,122,566,000.
    10     (b)  Furniture and equipment.--The total authorization for
    11  the additional capital projects in the category of public
    12  improvement projects consisting of the acquisition of original
    13  movable furniture and equipment to complete public improvement
    14  projects itemized in section 4 and to be acquired by the
    15  Department of General Services, its successors or assigns and to
    16  be financed by the incurring of debt shall be $64,846,000.
    17     (c)  Transportation assistance.--The total authorization for
    18  the capital projects in the category of transportation
    19  assistance projects itemized in section 5 with respect to which
    20  an interest is to be acquired in or constructed by the
    21  Department of Transportation, its successors or assigns and to
    22  be financed by the incurring of debt shall be $47,148,000.
    23     (d)  (Reserved).
    24     (e)  Flood control.--The total authorization for the capital
    25  projects in the category of flood control projects itemized in
    26  section 7 and to be constructed by the Department of
    27  Environmental Protection, its successors or assigns, and to be
    28  financed by the incurring of debt, shall be $4,350,000.
    29     (f)  Keystone Recreation, Park and Conservation Fund.--The
    30  total authorization for the capital projects in the category of
    20070H1589B1970                  - 2 -     

     1  public improvement projects itemized in section 8 and to be
     2  constructed by the Department of Conservation and Natural
     3  Resources, its successors or assigns and to be financed from
     4  current revenues in the Keystone Recreation, Park and
     5  Conservation Fund shall $28,613,000.
     6     (g)  Environmental Stewardship Fund projects.--The total
     7  authorization for the capital projects in the category of public
     8  improvement projects itemized in section 9 and to be constructed
     9  by the Department of Conservation and Natural Resources, its
    10  successors or assigns and to be financed from current revenues
    11  in the Environmental Stewardship Fund shall be $142,255,000.
    12     (h)  State forestry bridge projects.--The total authorization
    13  for the capital projects itemized in section 10 to be
    14  constructed by the Department of Conservation and Natural
    15  Resources, its successors or assigns and to be financed by oil
    16  company franchise tax revenues pursuant to 75 Pa.C.S. §
    17  9502(a)(2)(iv) (relating to imposition of tax) shall be
    18  $8,300,000.
    19     (i)  General Fund current revenue projects.--The total
    20  authorization for the capital projects in the category of public
    21  improvement projects itemized in section 11 and to be developed
    22  or constructed by the Department of General Services, its
    23  successors or assigns and to be financed from current revenues
    24  in the General Fund shall be $8,100,000.
    25  Section 3.  Itemization of public improvement capital projects.
    26     Additional capital projects in the category of public
    27  improvement projects to be constructed or acquired by the
    28  Department of General Services, its successors or assigns, and
    29  to be financed by the incurring of debt, are hereby itemized,
    30  together with their respective estimated financial costs, as
    20070H1589B1970                  - 3 -     

     1  follows:
     2                                                           Total
     3                                                          Project
     4             Project                                    Allocation
     5  (1)  Office of Administration
     6     (i)  Statewide mobile radio and microwave
     7         system
     8         (A)  Additional funds for DGS project 950-
     9             10, Statewide mobile radio and
    10             microwave system                           36,100,000
    11             (Base Project Allocation - $36,100,000)
    12  (2)  Department of Agriculture
    13     (i)  Health Diagnostic Laboratory
    14         (A)  Construct a new Pennsylvania Animal
    15             Health Diagnostic Laboratory (PADLS)
    16             with Bio-Safety Level-3 capabilities to
    17             support PADLS                              33,000,000
    18             (Base Project Allocation - $29,700,000)
    19             (Design and Contingencies - $3,300,000)
    20     (ii)  State Dairy Farm
    21         (A)  Rehabilitate and construct several
    22             support facilities for State dairy farm
    23             to complement existing dairy operation       500,000
    24             (Base Project Allocation - $450,000)
    25             (Design and Contingencies - $50,000)
    26  (3)  Department of Conservation and Natural
    27     Resources
    28     (i)  Bald Eagle State Park
    29         (A)  Rehabilitate and develop a family
    30             campground at the State park including
    20070H1589B1970                  - 4 -     

     1             infrastructure                              2,000,000
     2             (Base Project Allocation - $2,000,000)
     3     (ii)  Chester County
     4         (A)  Acquire the Strawbridge Property lands
     5             in Chester County                           4,000,000
     6             (Land Allocation - $4,000,000)
     7     (iii)  Clear Creek State Park
     8         (A)  Construct new maintenance facility
     9             including infrastructure                    1,800,000
    10             (Base Project Allocation - $1,800,000)
    11     (iv)  Cook Forest State Park
    12         (A)  Replace the office/visitors' center        2,500,000
    13             (Base Project Allocation - $2,000,000)
    14             (Design and Contingencies - $500,000)
    15         (B)  Replace the pit latrines with modern
    16             flush facilities including
    17             infrastructure                              1,000,000
    18             (Base Project Allocation - $800,000)
    19             (Design and Contingencies - $200,000)
    20     (v)  Erie Bluffs State Park
    21         (A)  Provide for construction of the
    22             initial development of 540 acre area
    23             including infrastructure, roads,
    24             trails, parking lots and boating
    25             facilities                                 10,000,000
    26             (Base Project Allocation - $8,000,000)
    27             (Design and Contingencies - $2,000,000)
    28     (vi)  Forest District 3
    29         (A)  Rehabilitate and improve the Gunter
    30             Valley Dam to return it to a safe
    20070H1589B1970                  - 5 -     

     1             condition and in compliance with
     2             current requirements                        7,000,000
     3             (Base Project Allocation - $5,600,000)
     4             (Design and Contingencies - $1,400,000)
     5     (vii)  Forest District 4
     6         (A)  Repair and repave roads including
     7             returning a portion back to a gravel
     8             road                                        5,000,000
     9             (Base Project Allocation - $4,000,000)
    10             (Design and Contingencies - $1,000,000)
    11     (viii)  Forest District 7
    12         (A)  Rehabilitate roadways throughout the
    13             forest to ensure safety and to provide
    14             public access for outdoor activities        3,000,000
    15             (Base Project Allocation - $2,400,000)
    16             (Design and Contingencies - $600,000)
    17     (ix)  Forest District 9
    18         (A)  Rehabilitate roadways throughout the
    19             forest to ensure safety and to provide
    20             public access for outdoor activities        3,000,000
    21             (Base Project Allocation - $2,400,000)
    22             (Design and Contingencies - $600,000)
    23     (x)  Forest District 10
    24         (A)  Rehabilitate roadways throughout the
    25             forest to ensure safety and to provide
    26             public access for outdoor activities        3,000,000
    27             (Base Project Allocation - $2,400,000)
    28             (Design and Contingencies - $600,000)
    29     (xi)  Forest District 12
    30         (A)  Rehabilitate roadways throughout the
    20070H1589B1970                  - 6 -     

     1             forest to ensure safety and to provide
     2             public access for outdoor activities        3,000,000
     3             (Base Project Allocation - $2,400,000)
     4             (Design and Contingencies - $600,000)
     5     (xii)  Forest District 13
     6         (A)  Rehabilitate roadways throughout the
     7             forest to ensure safety and to provide
     8             public access for outdoor activities        3,000,000
     9             (Base Project Allocation - $2,400,000)
    10             (Design and Contingencies - $600,000)
    11     (xiii)  Forest District 15
    12         (A)  Rehabilitate roadways throughout the
    13             forest to ensure safety and to provide
    14             public access for outdoor activities        3,000,000
    15             (Base Project Allocation - $2,400,000)
    16             (Design and Contingencies - $600,000)
    17     (xiv)  Forest District 16
    18         (A)  Rehabilitate roadways throughout the
    19             forest to ensure safety and to provide
    20             public access for outdoor activities        3,000,000
    21             (Base Project Allocation - $2,400,000)
    22             (Design and Contingencies - $600,000)
    23     (xv)  Forest District 20
    24         (A)  Rehabilitate roadways throughout the
    25             forest to ensure safety and to provide
    26             public access for outdoor activities        3,000,000
    27             (Base Project Allocation - $2,400,000)
    28             (Design and Contingencies - $600,000)
    29         (B)  Rehabilitate rest facilities, parking
    30             lots and multiple use trails and
    20070H1589B1970                  - 7 -     

     1             refurbish living quarters as a
     2             departmental training facility with
     3             necessary equipment                         2,500,000
     4             (Base Project Allocation - $2,000,000)
     5             (Design and Contingencies - $500,000)
     6     (xvi)  Gouldsboro State Park
     7         (A)  Rehabilitate day use area and provide
     8             for the replacement of lifeguard
     9             building, bathhouse, boat rental
    10             building and comfort station including
    11             infrastructure                              2,500,000
    12             (Base Project Allocation - $2,000,000)
    13             (Design and Contingencies - $500,000)
    14     (xvii)  Lehigh Gorge State Park
    15         (A)  Provide for the acquisition of land
    16             necessary to complete the scheme for
    17             the park in conformance with Statewide
    18             recreation plan                             3,500,000
    19             (Land Allocation - $3,500,000)
    20     (xviii)  Montgomery County
    21         (A)  Acquire the Erdenheim Farm lands in
    22             Montgomery County                           4,000,000
    23             (Land Allocation -$4,000,000)
    24     (xix)  Nescopeck State Park
    25         (A)  Develop day use area and provide for
    26             the development of recreational and
    27             educational facilities for day use          3,000,000
    28             (Base Project Allocation - $2,500,000)
    29             (Design and Contingencies - $500,000)
    30     (xx)  Promised Land State Park
    20070H1589B1970                  - 8 -     

     1         (A)  Rehabilitate and improve lower lake
     2             dam to return it to a safe condition
     3             and in compliance with current
     4             requirements                                3,500,000
     5             (Base Project Allocation - $2,800,000)
     6             (Design and Contingencies - $700,000)
     7     (xxi)  Quehanna Wild Area
     8         (A)  Provide for the remediation of land of
     9             radioactive materials within the
    10             Quehanna wild area at the former
    11             nuclear reactor site                        2,500,000
    12             (Base Project Allocation - $2,500,000)
    13         (B)  Facilitate the cleanup and reclamation
    14             of the Quehanna reactor site at
    15             Moshannon State Forest                      1,834,000
    16             (Base Project Allocation - $1,834,000)
    17     (xxii)  Ricketts Glen State Park
    18         (A)  Repair and repave roads including
    19             returning a portion back to a gravel
    20             road                                        3,500,000
    21             (Base Project Allocation - $2,800,000)
    22             (Design and Contingencies - $700,000)
    23     (xxiii)  S.B. Elliott State Park
    24         (A)  Additional funding to complete the
    25             visitors' center and overnight lodging
    26             including furnishings and equipment         3,500,000
    27             (Base Project Allocation - $3,500,000)
    28     (xxiv)  Shikellamy State Park
    29         (A)  Rehabilitate marina damaged by flood
    30             waters in 2005 and 2006 including new
    20070H1589B1970                  - 9 -     

     1             docks, railings, concrete bulkheads and
     2             courtesy docks                              1,500,000
     3             (Base Project Allocation - $1,200,000)
     4             (Design and Contingencies - $300,000)
     5  (4)  Department of Corrections
     6     (i)  State Correctional Institution at
     7         Cambridge Springs
     8         (A)  Construct a new 128-cell L-3 close
     9             security housing unit with 230-bed
    10             capacity with infrastructure upgrade       13,500,000
    11             (Base Project Allocation - $10,800,000)
    12             (Design and Contingencies - $2,700,000)
    13     (ii)  State Correctional Institution at Camp
    14         Hill
    15         (A)  Additional funds for DGS project 573-
    16             26, replacement of Group 1 plumbing
    17             components                                  8,000,000
    18             (Base Project Allocation - $6,400,000)
    19             (Design and Contingencies - $1,600,000)
    20         (B)  Additional funds for DGS project 573-
    21             27, provide additional funding for
    22             Phase 2 to complete the plumbing
    23             repairs started under project 573-27        6,000,000
    24             (Base Project Allocation - $4,800,000)
    25             (Design and Contingencies - $1,200,000)
    26     (iii)  State Correctional Institution at Coal
    27         Township
    28         (A)  Construct a new 128-cell L-3 close
    29             security housing unit with 230-bed
    30             capacity with infrastructure upgrade       13,500,000
    20070H1589B1970                 - 10 -     

     1             (Base Project Allocation - $10,800,000)
     2             (Design and Contingencies - $2,700,000)
     3     (iv)  State Correctional Institution at Cresson
     4         (A)  Renovate and upgrade the heating and
     5             air conditioning system serving the
     6             medical building                              550,000
     7             (Base Project Allocation - $440,000)
     8             (Design and Contingencies - $110,000)
     9     (v)  State Correctional Institution at Dallas
    10         (A)  Construct a new 2,300-bed L-3 Medium
    11             Security prison on the grounds of SCI
    12             Dallas including infrastructure and
    13             road work to incorporate the two
    14             facilities at this site                   189,000,000
    15             (Base Project Allocation -
    16             $151,200,000)
    17             (Design and Contingencies -
    18             $37,800,000)
    19     (vi)  State Correctional Institution at Forest
    20         (A)  Construct a new 128-cell L-5 close
    21             security housing unit with
    22             infrastructure upgrade                     15,500,000
    23             (Base Project Allocation - $12,400,000)
    24             (Design and Contingencies - $3,100,000)
    25     (vii)  State Correctional Institution at
    26         Frackville
    27         (A)  Replace and upgrade the institution's
    28             main electrical switchgear                    520,000
    29             (Base Project Allocation - $416,000)
    30             (Design and Contingencies - $104,000)
    20070H1589B1970                 - 11 -     

     1     (viii)  State Correctional Institution at
     2         Huntingdon
     3         (A)  Construct a new 2,000-bed L-3 medium
     4             security prison on the grounds of SCI
     5             Huntingdon including infrastructure and
     6             road work to incorporate the two
     7             facilities at this site                   175,000,000
     8             (Base Project Allocation -
     9             $140,000,000)
    10             (Design and Contingencies -
    11             $35,000,000)
    12     (ix)  State Correctional Institution at Laurel
    13         Highlands
    14         (A)  Replace roofs on dietary building No.
    15             4 and housing unit building C                 800,000
    16             (Base Project Allocation - $640,000)
    17             (Design and Contingencies - $160,000)
    18     (x)  State Regional Correctional Facility at
    19         Mercer
    20         (A)  Replace roofs on Medical Building, M
    21             Block and G Block                             650,000
    22             (Base Project Allocation - $520,000)
    23             (Design and Contingencies - $130,000)
    24     (xi)  State Correctional Institution at Muncy
    25         (A)  Replace roofs on administration,
    26             laundry, storeroom and kitchen
    27             buildings and housing units A Block, M
    28             Block, K Block and F Block                  2,300,000
    29             (Base Project Allocation - $1,840,000)
    30             (Design and Contingencies - $460,000)
    20070H1589B1970                 - 12 -     

     1     (xii)  State Correctional Institution at Pine
     2         Grove
     3         (A)  Construct a new 128-cell L-3 close
     4             security housing unit with 230-bed
     5             capacity with infrastructure upgrade       13,500,000
     6             (Base Project Allocation - $10,800,000)
     7             (Design and Contingencies - $2,700,000)
     8     (xiii)  State Correctional Institution at
     9         Rockview
    10         (A)  Construct a new 2,000-bed L-3 Medium
    11             Security prison on the grounds of SCI
    12             Rockview including infrastructure and
    13             road work to incorporate the two
    14             facilities at this site                   175,000,000
    15             (Base Project Allocation -
    16             $140,000,000)
    17             (Design and Contingencies -
    18             $35,000,000)
    19  (5)  Department of Education
    20     (i)  Scranton State School for the Deaf
    21         (A)  Provide improvements and upgrades to
    22             the emergency, mechanical and
    23             electrical systems throughout the
    24             campus                                      7,560,000
    25             (Base Project Allocation - $6,574,000)
    26             (Design and Contingencies - $986,000)
    27     (ii)  Pennsylvania State University
    28         (A)  Provide for the capital renewal for
    29             campuses in the eastern region of the
    30             university including code compliances
    20070H1589B1970                 - 13 -     

     1             and infrastructure upgrades                 7,000,000
     2             (Base Project Allocation - $7,000,000)
     3         (B)  Provide for the capital renewal for
     4             campuses in the central region of the
     5             university including code compliances
     6             and infrastructure upgrades                 7,000,000
     7             (Base Project Allocation - $7,000,000)
     8         (C)  Provide for the capital renewal for
     9             campuses in the western region of the
    10             university including code compliances
    11             and infrastructure upgrades                 7,000,000
    12             (Base Project Allocation - $7,000,000)
    13     (iii)  University of Pittsburgh
    14         (A)  Providing for upgrades and deferred
    15             maintenance needs on all campuses          20,000,000
    16             (Base Project Allocation - $16,667,000)
    17             (Design and Contingencies - $3,333,000)
    18     (iv)  Lincoln University
    19         (A)  Renovate Langston Hughes Library and
    20             correct problems from structural design
    21             flaws                                       7,000,000
    22             (Base Project Allocation - $5,600,000)
    23             (Design and Contingencies - $1,400,000)
    24         (B)  Renovate Wright Hall building systems,
    25             classrooms and laboratory including ADA
    26             requirements                                4,000,000
    27             (Base Project Allocation - $3,200,000)
    28             (Design and Contingencies - $800,000)
    29  (6)  Department of Environmental Protection
    30     (i)  Cambria County
    20070H1589B1970                 - 14 -     

     1         (A)  Additional funds for Patton Flood
     2             Project to the upstream section and
     3             remove existing levee in the downstream
     4             section                                     3,600,000
     5             (Base Project Allocation - $3,000,000)
     6             (Design and Contingencies - $600,000)
     7         (B)  Construct Lancashire No.15 acid mine
     8             drainage treatment plant to improve an
     9             estimated 25 miles of the west branch
    10             of the Susquehanna River                   10,025,000
    11             (Base Project Allocation - $10,025,000)
    12     (ii)  Clearfield and/or Cambria County
    13         (A)  Construct active acid mine drainage
    14             facility for currently untreated mine
    15             pool discharge in the Susquehanna River
    16             basin to offset agricultural
    17             consumptive use demands                     6,000,000
    18             (Base Project Allocation - $6,000,000)
    19     (iii)  Clearfield and Elk Counties
    20         (A)  Construct active acid mine drainage
    21             facility near the Village of Hollywood,
    22             Huston Township, Clearfield County, to
    23             restore water quality in the Bennett
    24             Branch Sinnemahoning Creek in support
    25             of the PA Wilds initiative                 12,125,000
    26             (Base Project Allocation - $12,125,000)
    27     (iv)  Fulton County
    28         (A)  Reconstruct two streams currently
    29             flowing into abandoned surface mine
    30             pits in order to restore the natural
    20070H1589B1970                 - 15 -     

     1             stream flow to the Great Trough Creek       2,000,000
     2             (Base Project Allocation - $2,000,000)
     3     (v)  Indiana County
     4         (A)  Construct active acid mine drainage
     5             facility near the abandoned Wehrum
     6             shaft to treat discharges from two
     7             abandoned mine complexes discharging to
     8             Blacklick Creek                             6,000,000
     9             (Base Project Allocation - $6,000,000)
    10     (vi)  Luzerne County
    11         (A)  Additional funds for DGS Project 184-
    12             23, flood control project on Mill
    13             Creek, Avoca Borough                        1,200,000
    14             (Base Project Allocation - $1,000,000)
    15             (Design and Contingencies - $200,000)
    16  (7)  Department of General Services
    17     (i)  Dauphin County
    18         (A)  Provide for steam plant replacements
    19             and upgrades in Capitol Annex               1,563,000
    20             (Base Project Allocation - $1,250,000)
    21             (Design and Contingencies - $313,000)
    22         (B)  Provide for remediation of mold,
    23             asbestos and other hazmat in buildings
    24             and equipment areas in Capitol Annex        5,625,000
    25             (Base Project Allocation - $4,500,000)
    26             (Design and Contingencies - $1,125,000)
    27         (C)  Upgrade building heating system and
    28             install new air conditioning system in
    29             Capitol Annex                               3,750,000
    30             (Base Project Allocation - $3,000,000)
    20070H1589B1970                 - 16 -     

     1             (Design and Contingencies - $750,000)
     2         (D)  Replace main Capitol Complex
     3             Substation switchgears including
     4             control status board along with
     5             transformers and circuit breakers          25,000,000
     6             (Base Project Allocation - $20,000,000)
     7             (Design and Contingencies - $5,000,000)
     8         (E)  Replace existing 15kv distribution
     9             feeders throughout the Capitol Complex
    10             and reset the system primary and
    11             secondary circuit breakers for proper
    12             overall system coordination                10,625,000
    13             (Base Project Allocation - $8,500,000)
    14             (Design and Contingencies - $2,125,000)
    15         (F)  Refurbish Capital Park by providing
    16             for a new retaining wall along Walnut
    17             Street including new grading and
    18             installation of a water conduction
    19             system                                      1,000,000
    20             (Base Project Allocation - $750,000)
    21             (Design and Contingencies - $250,000)
    22         (G)  Replace all cloth ceilings in halls of
    23             the Capitol East Wing                       1,000,000
    24             (Base Project Allocation - $750,000)
    25             (Design and Contingencies - $250,000)
    26         (H)  Replace existing macadam with new
    27             covering and sealant to prevent water
    28             leakage and replace drains and piping
    29             at the parking facility at 22nd and
    30             Forster Streets, Harrisburg                 1,100,000
    20070H1589B1970                 - 17 -     

     1             (Base Project Allocation - $880,000)
     2             (Design and Contingencies - $220,000)
     3         (I)  Repair the roof membrane and replace
     4             broken pavers at the Rachel Carson
     5             State Office Building                         750,000
     6             (Base Project Allocation - $600,000)
     7             (Design and Contingencies - $150,000)
     8  (8)  Pennsylvania Historical and Museum Commission
     9     (i)  Daniel Boone Homestead
    10         (A)  Provide for site improvements and
    11             restore the boyhood home of Daniel
    12             Boone                                         960,000
    13             (Base Project Allocation - $800,000)
    14             (Design and Contingencies - $160,000)
    15     (ii)  Landis Valley Museum
    16         (A)  Provide for the design and
    17             construction of a new maintenance
    18             building                                      960,000
    19             (Base Project Allocation - $800,000)
    20             (Design and Contingencies - $160,000)
    21     (iii)  Pennsbury Manor
    22         (A)  Rehabilitate up to 23 buildings and
    23             site development of infrastructure
    24             throughout the site                         1,920,000
    25             (Base Project Allocation - $1,600,000)
    26             (Design and Contingencies - $320,000)
    27     (iv)  Pennsylvania Lumber Museum
    28         (A)  Reconfigure entrance to the building
    29             to permit one coordinated exhibit
    30             gallery rather than two disjointed
    20070H1589B1970                 - 18 -     

     1             galleries                                   2,400,000
     2             (Base Project Allocation - $2,000,000)
     3             (Design and Contingencies - $400,000)
     4  (9)  Department of Military and Veterans Affairs
     5     (i)  Pittsburgh Hunt Readiness Center,
     6         Allegheny County
     7         (A)  Rehabilitate readiness center
     8             including assembly hall, classrooms,
     9             administrative offices, storage spaces,
    10             restrooms, locker rooms and mechanical
    11             rooms                                       3,000,000
    12             (Base Project Allocation - $2,400,000)
    13             (Design and Contingencies - $600,000)
    14     (ii)  Southwestern Veterans Center, Allegheny
    15         County
    16         (A)  Replace sewer main                           331,000
    17             (Base Project Allocation - $248,000)
    18             (Design and Contingencies - $83,000)
    19     (iii)  Hollidaysburg Veterans Home, Blair
    20         County
    21         (A)  Rehabilitate fire alarm and sprinkler
    22             systems in Arnold, Dietary, Eisenhower
    23             and MacArthur Halls to meet life safety
    24             compliance                                  2,722,000
    25             (Base Project Allocation - $2,268,000)
    26             (Design and Contingencies - $454,000)
    27     (iv)  Harrisburg Military Post, Dauphin County
    28         (A)  Rehabilitate various buildings and
    29             facilities on the military post
    30             including assembly halls, classrooms,
    20070H1589B1970                 - 19 -     

     1             administrative offices, storage spaces,
     2             restrooms, locker rooms, mechanical
     3             rooms and expanded parking                  6,000,000
     4             (Base Project Allocation - $4,800,000)
     5             (Design and Contingencies - $1,200,000)
     6     (v)  Wilkes-Barre Readiness Center, Luzerne
     7         County
     8         (A)  Rehabilitate readiness center
     9             including assembly hall, classrooms,
    10             administrative offices, storage spaces,
    11             restrooms, locker rooms, mechanical
    12             rooms and rehabilitation and expansion
    13             of parking                                  4,000,000
    14             (Base Project Allocation - $3,200,000)
    15             (Design and Contingencies - $800,000)
    16     (vi)  Southeastern Veterans Center, Montgomery
    17         County
    18         (A)  Rehabilitate fire alarm and sprinkler
    19             systems to meet life safety compliance      1,276,000
    20             (Base Project Allocation - $1,063,000)
    21             (Design and Contingencies - $213,000)
    22     (vii)  Philadelphia Lancaster Avenue Readiness
    23         Center, Philadelphia County
    24         (A)  Rehabilitate readiness center to
    25             include assembly hall, classrooms,
    26             administrative offices, storage spaces,
    27             restrooms, locker rooms and mechanical
    28             rooms                                       6,000,000
    29             (Base Project Allocation - $5,000,000)
    30             (Design and Contingencies - $1,000,000)
    20070H1589B1970                 - 20 -     

     1     (viii)  Philadelphia Southampton Road Armory,
     2         Philadelphia County
     3         (A)  Replace several air handling units and
     4             associated pumps and motors and install
     5             new chiller with ice storage capacity
     6             to be made at night that will
     7             distribute cooling during the day           1,500,000
     8             (Base Project Allocation - $1,300,000)
     9             (Design and Contingencies - $200,000)
    10  (10)  Department of Public Welfare
    11     (i)  Allentown State Hospital
    12         (A)  Upgrade three coal boilers currently
    13             in poor condition and replace traveling
    14             grate stokers and controls                  3,600,000
    15             (Base Project Allocation - $3,000,000)
    16             (Design and Contingencies - $600,000)
    17     (ii)  Clarks Summit State Hospital
    18         (A)  Replace the electrical distribution
    19             center at the sewage treatment plant
    20             and install new 400 amp service, motor
    21             control center, new transformer and new
    22             back-up supply                              1,200,000
    23             (Base Project Allocation - $1,000,000)
    24             (Design and Contingencies - $200,000)
    25     (iii)  Ebensburg Center
    26         (A)  Replace all roofed areas which cover
    27             residential housing units                   1,440,000
    28             (Base Project Allocation - $1,200,000)
    29             (Design and Contingencies - $240,000)
    30         (B)  Replace current emergency generators
    20070H1589B1970                 - 21 -     

     1             with stand alone outside units in all
     2             seven residential units                     1,500,000
     3             (Base Project Allocation - $1,250,000)
     4             (Design and Contingencies - $250,000)
     5     (iv)  Loysville Youth Development Center
     6         (A)  Construct a modular multipurpose
     7             gym/kitchen/classroom building              3,000,000
     8             (Base Project Allocation - $2,500,000)
     9             (Design and Contingencies - $500,000)
    10     (v)  Loysville Complex, South Mountain Secure
    11         Treatment Unit
    12         (A)  Construct a modular multipurpose
    13             gym/kitchen/classroom building              3,000,000
    14             (Base Project Allocation - $2,500,000)
    15             (Design and Contingencies - $500,000)
    16     (vi)  Mayview State Hospital
    17         (A)  Upgrade the primary electrical system
    18             including all central feeder circuits       3,000,000
    19             (Base Project Allocation - $2,500,000)
    20             (Design and Contingencies - $500,000)
    21     (vii)  Norristown State Hospital
    22         (A)  Renovate the boiler plant for building
    23             60, Phase 3 of DGS project 509-29,
    24             reconstruction or replacement of
    25             boilers to meet emissions requirements
    26             and upgrade the steam distribution
    27             system                                      1,800,000
    28             (Base Project Allocation - $1,500,000)
    29             (Design and Contingencies - $300,000)
    30     (viii)  Polk Center
    20070H1589B1970                 - 22 -     

     1         (A)  Replace valves, backwash pump and
     2             replenish filters with new media in
     3             order to keep water plant in compliance
     4             with regulations                            1,400,000
     5             (Base Project Allocation - $1,120,000)
     6             (Design and Contingencies - $280,000)
     7     (ix)  Selinsgrove Center
     8         (A)  Upgrade the boiler controls for the
     9             facility                                      600,000
    10             (Base Project Allocation - $500,000)
    11             (Design and Contingencies - $100,000)
    12         (B)  Purchase and install package boiler
    13             for more efficient handling of summer
    14             steam load                                    960,000
    15             (Base Project Allocation - $800,000)
    16             (Design and Contingencies - $160,000)
    17     (x)  South Mountain Restoration Center
    18         (A)  Purchase and install package boiler
    19             for more efficient handling of summer
    20             steam load                                    840,000
    21             (Base Project Allocation - $700,000)
    22             (Design and Contingencies - $140,000)
    23     (xi)  Torrance State Hospital
    24         (A)  Bore two horizontal wells into a
    25             mountainside to expand and improve
    26             freshwater collection                         720,000
    27             (Base Project Allocation - $600,000)
    28             (Design and Contingencies - $120,000)
    29     (xii)  Wernersville State Hospital
    30         (A)  Upgrade coal boiler refractory and
    20070H1589B1970                 - 23 -     

     1             structural components                         360,000
     2             (Base Project Allocation - $300,000)
     3             (Design and Contingencies - $60,000)
     4     (xiii)  White Haven Center
     5         (A)  Replace the heating systems in
     6             residential buildings from existing old
     7             radiant heat to more modern, digitally-
     8             controlled, high-efficiency HVAC
     9             systems                                     2,400,000
    10             (Base Project Allocation - $2,000,000)
    11             (Design and Contingencies - $400,000)
    12  (11)  Pennsylvania State Police
    13     (i)  Dunmore Headquarters, Lackawanna County
    14         (A)  Construct a new headquarters facility,
    15             garage and hangar to replace existing
    16             facilities in Lackawanna County            10,800,000
    17             (Base Project Allocation - $9,000,000)
    18             (Design and Contingencies - $1,800,000)
    19  (12)  State System of Higher Education
    20     (i)  Bloomsburg University of Pennsylvania
    21         (A)  Additional funding for the renovation
    22             of the Nelson Field House while
    23             providing additional athletic and
    24             office space                                1,000,000
    25     (ii)  Cheyney University of Pennsylvania
    26         (A)  Additional funding to replace Browne
    27             Hall including upgrading infrastructure
    28             according to modern codes and fire
    29             safety code requirements                    1,000,000
    30     (iii)  East Stroudsburg University of
    20070H1589B1970                 - 24 -     

     1             Pennsylvania
     2         (A)  Additional funding for the replacement
     3             of Rosenkrans Hall, providing
     4             additional classroom, laboratory and
     5             office space                                8,000,000
     6     (iv)  Edinboro University of Pennsylvania
     7         (A)  Renovate or replace Ross Hall
     8             including infrastructure and exterior
     9             surfaces                                   10,000,000
    10  (13)  Department of Transportation
    11     (i)  Clearfield County
    12         (A)  Replace or rehabilitate District 2-0
    13             Office including an addition on current
    14             site and infrastructure improvements       12,000,000
    15             (Base Project Allocation - $10,000,000)
    16             (Design and Contingencies - $2,000,000)
    17     (ii)  Dauphin County
    18         (A)  Construct or acquire a new county
    19             maintenance facility including salt and
    20             equipment storage buildings and site
    21             development                                13,800,000
    22             (Base Project Allocation - $11,000,000)
    23             (Land Allocation - $1,000,000)
    24             (Design and Contingencies - $1,800,000)
    25         (B)  Construct or acquire a new PennDOT
    26             driver and motor vehicle central
    27             office/service center including design,
    28             site acquisition and construction          58,000,000
    29             (Base Project Allocation - $50,000,000)
    30             (Land Allocation - $3,000,000)
    20070H1589B1970                 - 25 -     

     1             (Design and Contingencies - $5,000,000)
     2     (iii)  Mifflin County
     3         (A)  Construct or acquire a new county
     4             maintenance facility including salt and
     5             equipment storage buildings and site
     6             development                                13,800,000
     7             (Base Project Allocation - $11,000,000)
     8             (Land Allocation - $1,000,000)
     9             (Design and Contingencies - $1,800,000)
    10     (iv)  Wyoming County
    11         (A)  Construct or acquire a new county
    12             maintenance facility including salt and
    13             equipment storage buildings and site
    14             development                                13,800,000
    15             (Base Project Allocation - $11,000,000)
    16             (Land Allocation - $1,000,000)
    17             (Design and Contingencies - $1,800,000)
    18  Section 4.  Itemization of furniture and equipment projects.
    19     Additional capital projects in the category of public
    20  improvement projects consisting of the acquisition of movable
    21  furniture and equipment to complete public improvement projects
    22  and to be purchased by the Department of General Services, its
    23  successors or assigns and to be financed by the incurring of
    24  debt are hereby itemized, together with their respective
    25  estimated financial costs, as follows:
    26                                                           Total
    27                                                          Project
    28             Project                                    Allocation
    29  (1)  Office of Administration
    30     (i)  Statewide mobile radio and microwave
    20070H1589B1970                 - 26 -     

     1         system
     2         (A)  Additional funds for original
     3             furniture and equipment to make the
     4             Statewide radio and microwave system
     5             DGS project 950-10 operational             21,000,000
     6  (2)  Department of Conservation and Natural
     7     Resources
     8     (i)  Benjamin Rush State Park
     9         (A)  Original furniture and equipment for
    10             current capital projects                      217,000
    11     (ii)  Cook Forest State Park
    12         (A)  Original furniture and equipment for
    13             current capital projects                      114,000
    14     (iii)  Delaware Canal State Park
    15         (A)  Original furniture and equipment for
    16             current capital projects                      200,000
    17     (iv)  Kinzua Bridge State Park
    18         (A)  Original furniture and equipment for
    19             current capital projects                    3,000,000
    20     (v)  Nescopeck State Park
    21         (A)  Original furniture and equipment for
    22             current capital projects                      150,000
    23     (vi)  Pine Grove Furnace State Park
    24         (A)  Original furniture and equipment for
    25             current capital projects                      200,000
    26     (vii)  Presque Isle State Park
    27         (A)  Original furniture and equipment for
    28             current capital projects                      400,000
    29     (viii)  Sinnemahoning State Park
    30         (A)  Original furniture and equipment for
    20070H1589B1970                 - 27 -     

     1             current capital projects                    2,000,000
     2  (3)  Department of Corrections
     3     (i)  State Correctional Institution at Dallas
     4         (A)  Original furniture and equipment for
     5             the new institution                         6,500,000
     6     (ii)  State Correctional Institution at
     7         Huntingdon
     8         (A)  Original furniture and equipment for
     9             the new institution                         6,500,000
    10     (iii)  State Correctional Institution at
    11         Rockview
    12         (A)  Original furniture and equipment for
    13             the new institution                         6,500,000
    14  (4)  Department of Education
    15     (i)  Scranton School for the Deaf
    16         (A)  Movable furniture and equipment to
    17             allow modernization of classrooms and
    18             other buildings to meet current
    19             standards                                   2,625,000
    20     (ii)  Lincoln University
    21         (A)  Movable furniture and equipment to
    22             allow construction project at Wright
    23             Hall to become operational                  3,000,000
    24         (B)  Movable furniture and equipment at
    25             Langston Hughes Library for use for the
    26             completely renovated facility               4,000,000
    27  (5)  Pennsylvania Historical and Museum Commission
    28     (i)  Eckley Miners' Village
    29         (A)  Replacement of original furniture and
    30             equipment associated with the visiting
    20070H1589B1970                 - 28 -     

     1             public                                      1,920,000
     2     (ii)  Graeme Park
     3         (A)  Original furniture and equipment
     4             associated with the new orientation
     5             exhibit                                       720,000
     6     (iii)  Landis Valley Museum
     7         (A)  Construct new museum exhibits for the
     8             expanded visitors' center building and
     9             other buildings                             1,800,000
    10     (iv)  State Records Center
    11         (A)  Original furniture and equipment
    12             including a mobile high density storage
    13             system                                      1,800,000
    14  (6)  State System of Higher Education
    15     (i)  Kutztown University of Pennsylvania
    16         (A)  Supplemental funding for the purchase
    17             of movable furniture and equipment to
    18             allow Schaffer Auditorium construction
    19             project to become operational                 500,000
    20     (ii)  Millersville University of Pennsylvania
    21         (A)  Supplemental funding for the purchase
    22             of movable furniture and equipment to
    23             allow Theatre Arts Education Building
    24             construction project to become
    25             operational                                   200,000
    26     (iii)  Shippensburg University of Pennsylvania
    27         (A)  Supplemental funding for the purchase
    28             of movable furniture and equipment to
    29             allow Huber Arts Center construction
    30             project to become operational                 500,000
    20070H1589B1970                 - 29 -     

     1     (iv)  Slippery Rock University of Pennsylvania
     2         (A)  Supplemental funding for the purchase
     3             of movable furniture and equipment to
     4             allow Performing Arts Center
     5             construction project to become
     6             operational                                 1,000,000
     7  Section 5.  Itemization of transportation assistance projects.
     8     (a)  Mass transit.--Additional capital projects in the
     9  category of transportation assistance projects for mass transit
    10  in which an interest is to be acquired or constructed by the
    11  Department of Transportation, its successors or assigns and to
    12  be financed by the incurring of debt are hereby itemized,
    13  together with their estimated financial costs, as follows:
    14                                                           Total
    15                                                          Project
    16             Project                                    Allocation
    17  (1)  Beaver County Transit Authority
    18     (i)  Provide for improvements in bus
    19         circulation, passenger waiting and terminal
    20         areas at the Rochester Transportation
    21         Center (RTC), pedestrian improvements with
    22         the Transit Revitalization Investment
    23         District (TRID) area and from the RTC to
    24         the Rochester riverfront development and
    25         signal preemption/prioritization request
    26         system in the TRID area                           317,000
    27             (Base Project Allocation - $285,000)
    28             (Design and Contingencies - $32,000)
    29  (2)  Berks Area Reading Transit Authority
    30     (i)  Purchase and install an Auto Vehicle
    20070H1589B1970                 - 30 -     

     1         Locator System for both fixed route and
     2         paratransit systems                               167,000
     3             (Base Project Allocation - $150,000)
     4             (Design and Contingencies -$17,000)
     5  (3)  Cambria County Transit Authority
     6     (i)  Replace bus wash system, upgrade
     7         communication system and purchase security
     8         surveillance system                               100,000
     9             (Base Project Allocation - $90,000)
    10             (Design and Contingencies - $10,000)
    11     (ii)  Construct rural transfer center to
    12         increase service efficiency, attract new
    13         riders and provide easier transfers for
    14         riders                                            100,000
    15             (Base Project Allocation - $90,000)
    16             (Design and Contingencies - $10,000)
    17  (4)  Capital Area Transit
    18     (i)  Improve and renovate CAT's maintenance
    19         building to include three bays to repair
    20         and service 40-foot low floor buses               233,000
    21             (Base Project Allocation - $210,000)
    22             (Design and Contingencies - $23,000)
    23  (5)  Centre Area Transportation Authority
    24     (i)  Purchase 16 buses to replace buses which
    25         have met their useful life                        167,000
    26             (Base Project Allocation - $150,000)
    27             (Design and Contingencies - $17,000)
    28     (ii)  Purchase automatic vehicle locator system
    29         with the first phase to equip buses and
    30         service vehicles with such items as the
    20070H1589B1970                 - 31 -     

     1         automatic enunciators, electronic
     2         performance monitoring, stop-by-stop
     3         passenger counts, real time passenger
     4         information via the Internet and at major
     5         stops                                             156,000
     6             (Base Project Allocation - $140,000)
     7             (Design and Contingencies - $16,000)
     8  (6)  Crawford Area Transportation Authority
     9     (i)  Construct administrative intermodal center
    10         in downtown Meadville and purchase bus
    11         related equipment                                 333,000
    12             (Base Project Allocation - $300,000)
    13             (Design and Contingencies - $33,000)
    14  (7)  Erie Metropolitan Transit Authority
    15     (i)  Acquire five buses to replace five
    16         existing buses which have exceeded their
    17         useful life                                       379,000
    18             (Base Project Allocation - $341,000)
    19             (Design and Contingencies - $38,000)
    20     (ii)  Renovate administration/maintenance
    21         facility and purchase shop and
    22         miscellaneous equipment                            39,000
    23             (Base Project Allocation - $35,000)
    24             (Design and Contingencies - $4,000)
    25     (iii)  Purchase technology upgrades to radio
    26         and fare box systems and complete system
    27         wide signage                                       33,000
    28             (Base Project Allocation - $30,000)
    29             (Design and Contingencies - $3,000)
    30  (8)  Red Rose Transit Authority
    20070H1589B1970                 - 32 -     

     1     (i)  Replace bus washer and renovation and
     2         expand bus storage building                       375,000
     3             (Base Project Allocation - $337,000)
     4             (Design and Contingencies - $38,000)
     5     (ii)  Design and construct new station on
     6         AMTRAK Harrisburg to Philadelphia line in
     7         Paradise Township, Lancaster County               200,000
     8             (Base Project Allocation - $180,000)
     9             (Design and Contingencies - $20,000)
    10  (9)  Shenango Valley Shuttle Service
    11     (i)  Construct a maintenance facility including
    12         equipment and land acquisition                    250,000
    13             (Base Project Allocation - $225,000)
    14             (Design and Contingencies - $25,000)
    15  (10)  Southeastern Pennsylvania Transportation
    16     Authority
    17     (i)  Provide for the rehabilitation of
    18         improvements at Croyden and Levittown
    19         Stations located in Bucks County with
    20         improvements to include the installation of
    21         bus shelters and transit signage, station
    22         improvements, bus access improvements at
    23         both stations and parking expansion            3,500,000
    24             (Base Project Allocation - $3,150,000)
    25             (Design and Contingencies - $350,000)
    26     (ii)  Provide for the rehabilitation of
    27         improvements to bus and rail intermodal
    28         connections at the Glenside and Jenkintown
    29         Stations in Montgomery County with
    30         improvements to include design and
    20070H1589B1970                 - 33 -     

     1         construction of a multilevel 384 space
     2         parking garage at Glenside Station and a
     3         multilevel 700 space parking garage at
     4         Jenkintown Station                              6,700,000
     5             (Base Project Allocation - $6,030,000)
     6             (Design and Contingencies - $670,000)
     7     (iii)  FFY 2008 Transit Enhancement Program,
     8         provide for renovation and preservation of
     9         historic train stations and related
    10         activities including bus shelters,
    11         landscaping, street lights, pedestrian
    12         access and walkways, bicycle access,
    13         signage and enhanced access to transit for
    14         persons with disabilities                         670,000
    15             (Base Project Allocation - $603,000)
    16             (Design and Contingencies - $67,000)
    17     (iv)  Provide for construction of a multilevel
    18         parking structure and pedestrian overpass
    19         over AMTRAK tracks, to connect the west
    20         side of the campus of Villanova to the main
    21         campus, with parking for approximately
    22         1,000 vehicles and be handicapped
    23         accessible                                        625,000
    24             (Base Project Allocation - $562,000)
    25             (Design and Contingencies - $63,000)
    26     (v)  FFY 2002 Section 5309 Transit Enhancement
    27         Program, provide additional funding for the
    28         acquisition of 104 new rail cars for SEPTA
    29         Regional Rail service                           2,000,000
    30             (Base Project Allocation - $1,800,000)
    20070H1589B1970                 - 34 -     

     1             (Design and Contingencies - $200,000)
     2  (11)  Union and Snyder Transit Authority
     3     (i)  Construct maintenance facility including
     4         equipment and land acquisition                    304,000
     5             (Base Project Allocation - $273,000)
     6             (Design and Contingencies - $31,000)
     7  (12)  Department of Transportation
     8     (i)  Provide for rail passenger improvements
     9         across this Commonwealth including matching
    10         funds for the Keystone Corridor Federal
    11         funding                                        15,000,000
    12             (Base Project Allocation - $13,500,000)
    13             (Design and Contingencies - $1,500,000)
    14     (ii)  Provide for Intercity Bus Capital
    15         Assistance Intermodal Projects and ADA
    16         related facilities/equipment improvements       2,000,000
    17             (Base Project Allocation - $1,800,000)
    18             (Design and Contingencies - $200,000)
    19     (b)  Rural and intercity rail.--Additional capital projects
    20  in the category of transportation assistance projects for rural
    21  and intercity rail service projects to be constructed or with
    22  respect to which an interest is to be acquired by the Department
    23  of Transportation, its successors or assigns and to be financed
    24  by the incurring of debt are hereby itemized, together with
    25  their respective estimated financial costs, as follows:
    26                                                           Total
    27                                                          Project
    28             Project                                    Allocation
    29  (1)  Buffalo and Pittsburgh Railroad
    30     (i)  Rehabilitate mainline track in Armstrong,
    20070H1589B1970                 - 35 -     

     1         Clearfield, Indiana and Jefferson Counties,
     2         from Kittanning to Dubois and Punxsutawney
     3         to Homer City with work to include tie and
     4         rail replacement, surfacing, bridge repair,
     5         switch, road crossing, signal,
     6         communication and any other related work        5,000,000
     7  (2)  Lehigh Valley Rail Management
     8     (i)  Construct access and storage tanks and
     9         rehabilitate track within and around the
    10         Bethlehem Commerce Center                       3,500,000
    11     (c)  Air transportation.--Additional capital projects in the
    12  category of transportation assistance projects for air
    13  transportation service to which an interest is to be acquired by
    14  the Department of Transportation, its successors or assigns and
    15  to be financed by the incurring of debt are hereby itemized,
    16  together with their respective estimated financial costs, as
    17  follows:
    18                                                           Total
    19                                                          Project
    20             Project                                    Allocation
    21  (1)  Lehigh County
    22     (i)  Lehigh Valley International Airport
    23         (A)  Provide for the economic development
    24             and safety enhancement at the airport       5,000,000
    25             (Base Project Allocation - $4,500,000)
    26             (Design and Contingencies - $500,000)
    27  Section 6.  Itemization of redevelopment assistance capital
    28                 projects.
    29     (Reserved)
    30  Section 7.  Itemization of flood control projects.
    20070H1589B1970                 - 36 -     

     1     Additional capital projects in the category of flood control
     2  projects to be constructed by the Department of Environmental
     3  Protection, its successors or assigns, and to be financed by the
     4  incurring of debt are hereby itemized, together with their
     5  respective estimated costs, as follows:
     6                                                           Total
     7                                                          Project
     8             Project                                    Allocation
     9  (1)  Department of Environmental Protection
    10     (i)  Crawford County
    11         (A)  Conneautville Dam rehabilitation             750,000
    12     (ii)  Monroe County
    13         (A)  Additional funds to refurbish Brady's
    14             Lake Dam in order to rebid the project
    15             due to delays and poor performance in
    16             concrete mix design                         3,600,000
    17  Section 8.  Itemization of Keystone Recreation, Park and
    18                 Conservation Fund projects.
    19     Projects in the category of public improvement projects to be
    20  constructed by the Department of Conservation and Natural
    21  Resources, its successors or assigns, and to be financed by
    22  current revenues of the Keystone Recreation, Park and
    23  Conservation Fund are hereby itemized, together with their
    24  respective estimated costs, as follows:
    25                                                           Total
    26                                                          Project
    27             Project                                    Allocation
    28  (1)  Department of Conservation and Natural
    29     Resources
    30     (i)  Black Moshannon State Park
    20070H1589B1970                 - 37 -     

     1         (A)  Rehabilitate dam spillway and boat
     2             launch                                        400,000
     3             (Base Project Allocation - $400,000)
     4     (ii)  Blue Knob State Park
     5         (A)  Rehabilitate park facilities                 900,000
     6             (Base Project Allocation - $900,000)
     7         (B)  Rehabilitate day use area                  1,000,000
     8             (Base Project Allocation - $1,000,000)
     9     (iii)  Caledonia State Park
    10         (A)  Replace two bridges on main park road        600,000
    11             (Base Project Allocation - $600,000)
    12         (B)  Rehabilitate park campgrounds              1,100,000
    13             (Base Project Allocation - $1,100,000)
    14     (iv)  Codorus State Park
    15         (A)  Provide paving in park                       350,000
    16             (Base Project Allocation - $350,000)
    17     (v)  Denton Hill State Park
    18         (A)  Replace main park road/parking area          400,000
    19             (Base Project Allocation - $400,000)
    20     (vi)  Forest District 19
    21         (A)  Rehabilitate Egypt Meadows Dam               750,000
    22             (Base Project Allocation - $750,000)
    23     (vii)  Forest District 20
    24         (A)  Provide new resource management
    25             center                                      4,000,000
    26             (Base Project Allocation - $4,000,000)
    27     (viii)  Little Pine State Park
    28         (A)  Renovate restroom and lower picnic
    29             area                                          300,000
    30             (Base Project Allocation - $300,000)
    20070H1589B1970                 - 38 -     

     1     (ix)  Moshannon State Forest
     2         (A)  Provide cleanup to Quehanna reactor
     3             site                                        2,400,000
     4             (Base Project Allocation - $2,400,000)
     5     (x)  Prince Gallitzin State Park
     6         (A)  Replace two restrooms at the park            300,000
     7             (Base Project Allocation - $300,000)
     8         (B)  Pave roads within the park                   350,000
     9             (Base Project Allocation - $350,000)
    10     (xi)  Reeds Gap State Park
    11         (A)  Relocate park office building              1,500,000
    12             (Base Project Allocation - $1,500,000)
    13         (B)  Replace existing swimming pool             1,000,000
    14             (Base Project Allocation - $1,000,000)
    15     (xii)  S.B. Elliott State Park
    16         (A)  Provide ADA cabins and renovate
    17             washhouse                                   1,250,000
    18             (Base Project Allocation - $1,250,000)
    19     (xiii)  Shawnee State Park
    20         (A)  Repair joints in concrete spillway           300,000
    21             (Base Project Allocation - $300,000)
    22     (xiv)  Shikellamy State Park
    23         (A)  Project (PW 4182) to provide dock
    24             rehabilitation transient and launch
    25             areas                                         663,000
    26             (Base Project Allocation - $663,000)
    27         (B)  Renovate overlook road in the park           400,000
    28             (Base Project Allocation - $400,000)
    29     (xv)  Sinnemahoning State Park
    30         (A)  Repair dam spillway                          650,000
    20070H1589B1970                 - 39 -     

     1             (Base Project Allocation - $650,000)
     2     (xvi)  Various Parks and Forest Districts,
     3         Statewide
     4         (A)  Acquire land to be incorporated within
     5             the park system according to the
     6             Commonwealth's master plan                 10,000,000
     7             (Land Allocation - $10,000,000)
     8  Section 9.  Itemization of Environmental Stewardship Fund
     9                 projects.
    10     Projects in the category of public improvement projects to be
    11  constructed by the Department of Conservation and Natural
    12  Resources, its successors or assigns and to be financed by
    13  current revenues of the Environmental Stewardship Fund are
    14  hereby itemized together with their respective estimated
    15  financial costs as follows:
    16                                                           Total
    17                                                          Project
    18             Project                                    Allocation
    19  (1)  Department of Conservation and Natural
    20     Resources
    21     (i)  Bald Eagle State Park
    22         (A)  Rehabilitate roads within the park         1,600,000
    23             (Base Project Allocation - $1,600,000)
    24         (B)  Replace courtesy docks at eight public
    25             boat launches                                 300,000
    26             (Base Project Allocation - $300,000)
    27         (C)  Rehabilitate office and visitors'
    28             center                                      1,750,000
    29             (Base Project Allocation - $1,750,000)
    30     (ii)  Beltzville State Park
    20070H1589B1970                 - 40 -     

     1         (A)  Rehabilitate sewage treatment plant
     2             and correct sewer line infiltration           400,000
     3             (Base Project Allocation - $400,000)
     4     (iii)  Bendigo State Park
     5         (A)  Replace bathhouse, lifeguard station
     6             and day use restrooms in the park           1,000,000
     7             (Base Project Allocation - $1,000,000)
     8     (iv)  Canoe Creek State Park
     9         (A)  Rehabilitate sewage treatment plant          300,000
    10             (Base Project Allocation - $300,000)
    11     (v)  Chapman State Park
    12         (A)  Rehabilitate beach house and comfort
    13             station                                     1,900,000
    14             (Base Project Allocation - $1,900,000)
    15     (vi)  Cherry Springs State Park
    16         (A)  Replace pit latrines with flush
    17             restrooms and sewers                          770,000
    18             (Base Project Allocation - $770,000)
    19     (vii)  Clear Creek State Park
    20         (A)  Rehabilitate water system and replace
    21             pit latrines                                2,000,000
    22             (Base Project Allocation - $2,000,000)
    23         (B)  Rehabilitate park roads and bridges        1,500,000
    24             (Base Project Allocation - $1,500,000)
    25     (viii)  Colonel Denning State Park
    26         (A)  Provide new day restroom, sewage and
    27             shower house                                  350,000
    28             (Base Project Allocation - $350,000)
    29         (B)  Provide bathhouse, concession,
    30             restroom and sewage                           500,000
    20070H1589B1970                 - 41 -     

     1             (Base Project Allocation - $500,000)
     2     (ix)  Cook Forest State Park
     3         (A)  Rehabilitation of trail, Phase II            250,000
     4             (Base Project Allocation - $250,000)
     5         (B)  Rehabilitate five campground
     6             washhouses                                    600,000
     7             (Base Project Allocation - $600,000)
     8         (C)  Replace park office and visitors'
     9             center                                      2,000,000
    10             (Base Project Allocation - $2,000,000)
    11         (D)  Replace six river cabins                   2,200,000
    12             (Base Project Allocation - $2,200,000)
    13         (E)  Rehabilitate sewage system and
    14             repairs                                       750,000
    15             (Base Project Allocation - $750,000)
    16         (F)  Provide repairs to the water system          750,000
    17             (Base Project Allocation - $750,000)
    18         (G)  Rehabilitate road and parking lot          1,100,000
    19             (Base Project Allocation - $1,100,000)
    20     (x)  Colton Point State Park
    21         (A)  Replace two pit latrines with
    22             composting restroom, playground, picnic
    23             area and campground shower house            1,500,000
    24             (Base Project Allocation - $1,500,000)
    25     (xi)  Elk State Park
    26         (A)  Replace comfort station                      150,000
    27             (Base Project Allocation - $150,000)
    28     (xii)  Erie Bluffs State Park
    29         (A)  Construct entrance to the park               300,000
    30             (Base Project Allocation - $300,000)
    20070H1589B1970                 - 42 -     

     1     (xiii)  Evansburg State Park
     2         (A)  Provide road paving for the park             335,000
     3             (Base Project Allocation - $335,000)
     4         (B)  Replace sewer lines                          250,000
     5             (Base Project Allocation - $250,000)
     6         (C)  Replace temporary restrooms, Phase II        250,000
     7             (Base Project Allocation - $250,000)
     8     (xiv)  Forest District 2
     9         (A)  Construct new resource management
    10             center                                      3,500,000
    11             (Base Project Allocation - $3,500,000)
    12     (xv)  Forest District 3
    13         (A)  Establish new maintenance headquarter
    14             buildings in Juniata, Mifflin and Perry
    15             Counties                                      800,000
    16             (Base Project Allocation - $800,000)
    17         (B)  Rehabilitate Gunter Valley Dam in
    18             Perry County                                5,000,000
    19             (Base Project Allocation - $5,000,000)
    20     (xvi)  Forest District 4
    21         (A)  Rehabilitate Linn Run Road                 2,500,000
    22             (Base Project Allocation - $2,500,000)
    23     (xvii)  Forest District 5
    24         (A)  Rehabilitate resource management
    25             center                                      1,500,000
    26             (Base Project Allocation - $1,500,000)
    27     (xviii)  Forest District 8
    28         (A)  Rehabilitate Kittanning Resource
    29             Management Center                           1,500,000
    30             (Base Project Allocation - $1,500,000)
    20070H1589B1970                 - 43 -     

     1     (xix)  Forest District 14
     2         (A)  Rehabilitate historic stone house            250,000
     3             (Base Project Allocation - $250,000)
     4     (xx)  Forest District 18
     5         (A)  SR 54 comfort station and parking            500,000
     6             (Base Project Allocation - $500,000)
     7         (B)  New resource management center             3,500,000
     8             (Base Project Allocation - $3,500,000)
     9         (C)  Rehabilitate Roaring Creek tract
    10             facilities                                    600,000
    11             (Base Project Allocation - $600,000)
    12         (D)  Rehabilitate Roaring Creek tract
    13             trails and bridges                          1,155,000
    14             (Base Project Allocation - $1,155,000)
    15         (E)  Maintenance to Haldeman complex              300,000
    16             (Base Project Allocation - $300,000)
    17     (xxi)  Forest District 19
    18         (A)  New resource management center             3,500,000
    19             (Base Project Allocation - $3,500,000)
    20         (B)  Rehabilitate Little Summit Fire
    21             Station maintenance complex                   300,000
    22             (Base Project Allocation - $300,000)
    23         (C)  Project for Pine Flats Road                  200,000
    24             (Base Project Allocation - $200,000)
    25         (D)  Project for Flat Ridge Road                  200,000
    26             (Base Project Allocation - $200,000)
    27     (xxii)  Forest District 20
    28         (A)  Pave Dry Run Road                            300,000
    29             (Base Project Allocation - $300,000)
    30         (B)  Provide for Hillsgrove storage
    20070H1589B1970                 - 44 -     

     1             building                                      300,000
     2             (Base Project Allocation - $300,000)
     3         (C)  Pave High Knob Road                          500,000
     4             (Base Project Allocation - $500,000)
     5     (xxiii)  Frances Slocum State Park
     6         (A)  Rehabilitate sewage treatment plant
     7             and lines                                     600,000
     8             (Base Project Allocation - $600,000)
     9     (xxiv)  French Creek State Park
    10         (A)  Rehabilitate Scotts Run area               1,500,000
    11             (Base Project Allocation - $1,500,000)
    12     (xxv)  Gifford Pinchot State Park
    13         (A)  Phase II rehabilitation of camp area
    14             washhouse                                     400,000
    15             (Base Project Allocation - $400,000)
    16     (xxvi)  Gouldsboro State Park
    17         (A)  Repair dam at the park                       750,000
    18             (Base Project Allocation - $750,000)
    19         (B)  Replace pit bathhouse, comfort station
    20             and boat rental                               600,000
    21             (Base Project Allocation - $600,000)
    22     (xxvii)  Greenwood Furnace State Park
    23         (A)  Make repairs to sewage treatment
    24             plant                                         900,000
    25             (Base Project Allocation - $900,000)
    26     (xxviii)  Hickory Run State Park
    27         (A)  Replace pit latrines and water tank        1,800,000
    28             (Base Project Allocation - $1,800,000)
    29         (B)  Phase II of group camp roof
    30             replacement                                   200,000
    20070H1589B1970                 - 45 -     

     1             (Base Project Allocation - $200,000)
     2         (C)  Replace office and visitors' center        2,000,000
     3             (Base Project Allocation - $2,000,000)
     4         (D)  Replace pit toilets and four
     5             buildings                                   1,250,000
     6             (Base Project Allocation - $1,250,000)
     7     (xxix)  Hills Creek State Park
     8         (A)  Rehabilitate spillway                        600,000
     9             (Base Project Allocation - $600,000)
    10         (B)  Provide office renovation addition and
    11             visitors' center                            2,100,000
    12             (Base Project Allocation - $2,100,000)
    13     (xxx)  Hyner Run State Park
    14         (A)  Rehabilitate two park bridges and pave
    15             roadway                                       600,000
    16             (Base Project Allocation - $600,000)
    17         (B)  Replace two day use restrooms                300,000
    18             (Base Project Allocation - $300,000)
    19     (xxxi)  Kettle Creek State Park
    20         (A)  Provide bathhouse, shower house and
    21             sewage                                      1,800,000
    22             (Base Project Allocation - $1,800,000)
    23     (xxxii)  Kooser State Park
    24         (A)  Rehabilitate park roads and bridges        1,300,000
    25             (Base Project Allocation - $1,300,000)
    26     (xxxiii)  Lackawanna State Park
    27         (A)  Replace park office                        1,500,000
    28             (Base Project Allocation - $1,500,000)
    29         (B)  Rehabilitate pool complex and day use
    30             area                                        3,000,000
    20070H1589B1970                 - 46 -     

     1             (Base Project Allocation - $3,000,000)
     2     (xxxiv)  Laurel Hill State Park
     3         (A)  Breach Spruce Run Dam                        250,000
     4             (Base Project Allocation - $250,000)
     5         (B)  Provide Jones Mill Run Dam dredging          250,000
     6             (Base Project Allocation - $250,000)
     7         (C)  Rehabilitate group camp three sewage
     8             lines                                         250,000
     9             (Base Project Allocation - $250,000)
    10         (D)  Provide camping cottage shower house
    11             at the park                                   650,000
    12             (Base Project Allocation - $650,000)
    13         (E)  Rehabilitate contact station and
    14             parking                                       500,000
    15             (Base Project Allocation - $500,000)
    16     (xxxv)  Laurel Ridge State Park
    17         (A)  Replace turnpike trail bridge
    18             superstructure                              1,200,000
    19             (Base Project Allocation - $1,200,000)
    20     (xxxvi)  Little Pine State Park
    21         (A)  Rehabilitate dam                             500,000
    22             (Base Project Allocation - $500,000)
    23     (xxxvii)  Lyman Run State Park
    24         (A)  Provide construction to the spillway
    25             bridge                                        500,000
    26             (Base Project Allocation - $500,000)
    27     (xxxviii)  Marsh Creek State Park
    28         (A)  Pave all parking lots in the park            325,000
    29             (Base Project Allocation - $325,000)
    30         (B)  Provide ADA office expansion                 150,000
    20070H1589B1970                 - 47 -     

     1             (Base Project Allocation - $150,000)
     2     (xxxix)  McConnells Mill State Park
     3         (A)  Rehabilitate the park road                   275,000
     4             (Base Project Allocation - $275,000)
     5     (xl)  Moraine State Park
     6         (A)  Resurface bike trail in park               1,200,000
     7             (Base Project Allocation - $1,200,000)
     8         (B)  Rehabilitate Old 422 launch and road       1,000,000
     9             (Base Project Allocation - $1,000,000)
    10     (xli)  Neshaminy State Park
    11         (A)  Rehabilitate jetty                           350,000
    12             (Base Project Allocation - $350,000)
    13     (xlii)  Nockamixon State Park
    14         (A)  Provide paving in the park                   500,000
    15             (Base Project Allocation - $500,000)
    16         (B)  Replace three pit toilets                  1,000,000
    17             (Base Project Allocation - $1,000,000)
    18     (xliii)  Ohiopyle State Park
    19         (A)  Rehabilitate residence                       250,000
    20             (Base Project Allocation - $250,000)
    21         (B)  Replace bridge 0902-CSX 2288                 300,000
    22             (Base Project Allocation - $300,000)
    23         (C)  Construct parking above new office           900,000
    24             (Base Project Allocation - $900,000)
    25         (D)  Provide park office accessibility          2,000,000
    26             (Base Project Allocation - $2,000,000)
    27         (E)  Provide bathhouse, shower house and
    28             sewage                                        275,000
    29             (Base Project Allocation - $275,000)
    30     (xliv)  Oil Creek State Park
    20070H1589B1970                 - 48 -     

     1         (A)  Rehabilitate Boughton Bridge                 400,000
     2             (Base Project Allocation - $400,000)
     3         (B)  Phase I to repair trail slips                300,000
     4             (Base Project Allocation - $300,000)
     5     (xlv)  Parker Dam State Park
     6         (A)  Rehabilitate dam spillway                    350,000
     7             (Base Project Allocation - $350,000)
     8     (xlvi)  Park Region 1
     9         (A)  Rehabilitate surface water
    10             systems/filter                                300,000
    11             (Base Project Allocation - $300,000)
    12         (B)  Rehabilitate surface and well water
    13             supplies in Region 1 State parks            1,500,000
    14             (Base Project Allocation - $1,500,000)
    15     (xlvii)  Park Region 2
    16         (A)  Rehabilitate the residence                   250,000
    17             (Base Project Allocation - $250,000)
    18     (xlviii)  Pine Grove Furnace State Park
    19         (A)  Rehabilitate water treatment plant         2,000,000
    20             (Base Project Allocation - $2,000,000)
    21         (B)  Rehabilitate various buildings             3,400,000
    22             (Base Project Allocation - $3,400,000)
    23     (xlix)  Presque Isle State Park
    24         (A)  Provide bike trail extension to the
    25             Tom Ridge Environmental Center              1,800,000
    26             (Base Project Allocation - $1,800,000)
    27     (l)  Prince Gallitzin State Park
    28         (A)  Rehabilitate sewage treatment plant          800,000
    29             (Base Project Allocation - $800,000)
    30         (B)  Rehabilitate Beaver Valley Marina          2,900,000
    20070H1589B1970                 - 49 -     

     1             (Base Project Allocation - $2,900,000)
     2     (li)  Promised Land State Park
     3         (A)  Rehabilitate sewer line                      750,000
     4             (Base Project Allocation - $750,000)
     5         (B)  Replace bridge and spillway                3,100,000
     6             (Base Project Allocation - $3,100,000)
     7         (C)  Rehabilitate Pickerel Point and
     8             Deerfield campgrounds                       3,000,000
     9             (Base Project Allocation - $3,000,000)
    10         (D)  Rehabilitate boat rental area                500,000
    11             (Base Project Allocation - $500,000)
    12         (E)  Rehabilitate dump station                    300,000
    13             (Base Project Allocation - $300,000)
    14         (F)  Rehabilitate bridges                         120,000
    15             (Base Project Allocation - $120,000)
    16     (lii)  Pymatuning State Park
    17         (A)  Rehabilitate Espyville south launch
    18             and environs                                1,500,000
    19             (Base Project Allocation - $1,500,000)
    20         (B)  Rehabilitate Jamestown beach house           650,000
    21             (Base Project Allocation - $650,000)
    22         (C)  Rehabilitate sanitary facilities on
    23             the west side                               2,200,000
    24             (Base Project Allocation - $2,200,000)
    25     (liii)  Raccoon Creek State Park
    26         (A)  Provide roadway slip repairs                 800,000
    27             (Base Project Allocation - $800,000)
    28         (B)  Phase II rehabilitation of roads             300,000
    29             (Base Project Allocation - $300,000)
    30     (liv)  Ralph Stover State Park
    20070H1589B1970                 - 50 -     

     1         (A)  Replace pit latrines and sewer               500,000
     2             (Base Project Allocation - $500,000)
     3     (lv)  Ricketts Glen State Park
     4         (A)  Rehabilitate bathhouse and comfort
     5             stations                                    2,800,000
     6             (Base Project Allocation - $2,800,000)
     7         (B)  Rehabilitate roads and provide paving
     8             for parking lots                              650,000
     9             (Base Project Allocation - $650,000)
    10         (C)  Replace pit latrine Route 118 picnic
    11             area                                          400,000
    12             (Base Project Allocation - $400,000)
    13         (D)  Repair infiltration, sewage treatment
    14             plant and water system                        550,000
    15             (Base Project Allocation - $550,000)
    16     (lvi)  Ridley Creek State Park
    17         (A)  Reroof maintenance building                  400,000
    18             (Base Project Allocation - $400,000)
    19         (B)  Pave parking lot                             300,000
    20             (Base Project Allocation - $300,000)
    21     (lvii)  Salt Springs State Park
    22         (A)  Replace vault latrine                        300,000
    23             (Base Project Allocation - $300,000)
    24     (lviii)  Samuel S. Lewis State Park
    25         (A)  Provide two new comfort stations with
    26             on-lot sewage                                 750,000
    27             (Base Project Allocation - $750,000)
    28     (lix)  Shawnee State Park
    29         (A)  Rehabilitate water treatment plant         1,200,000
    30             (Base Project Allocation - $1,200,000)
    20070H1589B1970                 - 51 -     

     1     (lx)  Sinnemahoning State Park
     2         (A)  Rehabilitate main park road and
     3             replace bridges                             1,000,000
     4             (Base Project Allocation - $1,000,000)
     5     (lxi)  Sizerville State Park
     6         (A)  Modernize pit latrines and bathhouse       2,000,000
     7             (Base Project Allocation - $2,000,000)
     8         (B)  Provide new park office and visitors'
     9             center                                      1,800,000
    10             (Base Project Allocation - $1,800,000)
    11     (lxii)  Tiadaghton State Forest
    12         (A)  Construct Tiadaghton Management
    13             Center                                      4,500,000
    14             (Base Project Allocation - $4,500,000)
    15     (lxiii)  Tobyhanna State Park
    16         (A)  Rehabilitate day use area and
    17             campground                                  2,500,000
    18             (Base Project Allocation - $2,500,000)
    19     (lxiv)  Whipple Dam State Park
    20         (A)  Provide new multifunction beach
    21             building                                    1,200,000
    22             (Base Project Allocation - $1,200,000)
    23     (lxv)  Yellow Creek State Park
    24         (A)  Provide camping cottage shower house         650,000
    25             (Base Project Allocation - $650,000)
    26     (lxvi)  White Clay Creek Preserve
    27         (A)  Rebuild London Tract wall                    150,000
    28             (Base Project Allocation - $150,000)
    29     (lxvii)  Worlds End State Park
    30         (A)  Rehabilitate campground and day use
    20070H1589B1970                 - 52 -     

     1             area roads                                    350,000
     2             (Base Project Allocation - $350,000)
     3     (lxviii)  Various parks, Statewide
     4         (A)  Acquire land to be incorporated within
     5             the park system according to the
     6             Commonwealth's master plan                 10,000,000
     7             (Land Allocation - $10,000,000)
     8  Section 10.  Itemization of State forestry bridge projects.
     9     Projects in the category of State forestry bridge projects to
    10  be constructed by the Department of Conservation and Natural
    11  Resources, its successors or assigns, and to be financed by oil
    12  company franchise tax revenues pursuant to 75 Pa.C.S. §
    13  9502(a)(2)(iv) (relating to imposition of tax) are hereby
    14  itemized, together with their respective estimated costs, as
    15  follows:
    16                                                           Total
    17                                                          Project
    18             Project                                    Allocation
    19  (1)  Centre County
    20     (i)  Forest District 9
    21         (A)  Project for Meyers Run Road and Black
    22             Moshannon Creek                               400,000
    23         (B)  Project for North Run Road over Smays
    24             Run                                           300,000
    25  (2)  Clearfield County
    26     (i)  Forest District 9
    27         (A)  Project for Shirks Road over Black
    28             Moshannon Creek bridge No. 9-0028             300,000
    29         (B)  Project for Reservoir Road over Upper
    30             Three Run                                     300,000
    20070H1589B1970                 - 53 -     

     1         (C)  Project for Little Medix Road over
     2             Little Medix Run, bridge No. 9-0012           300,000
     3  (3)  Clinton County
     4     (i)  Forest District 10
     5         (A)  Project for Beaver Dam Road over
     6             Beaver Dam Run                                300,000
     7         (B)  Project for Birch Island Road over
     8             Amos Branch, bridge No. 10-0040               300,000
     9  (4)  Elk County
    10     (i)  Forest District 13
    11         (A)  Project for East Hicks Road over Barr
    12             Hollow                                        300,000
    13         (B)  Project for Little Dents Road over
    14             Dents Run Bridge No. 13-0032                  300,000
    15         (C)  Project for Dents Run Road over Little
    16             Bear Run                                      300,000
    17         (D)  Project for Dents Run Road over
    18             Weatherboard Run                              300,000
    19         (E)  Project for bridge over North Fork           300,000
    20  (5)  Huntingdon County
    21     (i)  Forest District 5
    22         (A)  Project for Krise Valley Road bridge         300,000
    23  (6)  Lycoming County
    24     (i)  Forest District 12
    25         (A)  Project for Trout Run Road and
    26             bridges                                       600,000
    27         (B)  Project for Frances Road over unnamed
    28             tributary near Black Forest Trail             300,000
    29  (7)  Perry County
    30     (i)  Forest District 3
    20070H1589B1970                 - 54 -     

     1         (A)  Project for the Second Narrows Road
     2             bridge                                        300,000
     3  (8)  Tioga County
     4     (i)  Forest District 12
     5         (A)  Project for Francis Road over unnamed
     6             tributary at Pipeline Road                    300,000
     7         (B)  Project for Francis Road over Woodward
     8             Hollow                                        300,000
     9         (C)  Project for Francis Road over Randall
    10             Hollow bridge No. 12-9003                     300,000
    11         (D)  Project for Francis Road over Kramer
    12             Hollow bridge No. 12-9016                     300,000
    13         (E)  Project for Francis Road over Francis
    14             Branch bridge No. 12-0048                     300,000
    15     (ii)  Forest District 16
    16         (A)  Project for Spoor Hollow Road over
    17             Norris Brook bridge No. 16-0001               300,000
    18         (B)  Project for Cedar Mountain Road over
    19             Cedar Run bridge No. 16-0014                  300,000
    20  (9)  Union County
    21     (i)  Forest District 7
    22         (A)  Replace Brandon Road bridge                  300,000
    23         (B)  Project for Cooper Mill Road bridge          300,000
    24  (10)  Clearfield and Elk Counties
    25     (i)  Forest District 9
    26         (A)  Project for three culverts on Little
    27             Medix Road over Little Medix Run              400,000
    28  Section 11.  Itemization of General Fund current revenue
    29                 projects.
    30     The individual capital projects in the category of public
    20070H1589B1970                 - 55 -     

     1  improvement projects to be constructed or acquired by the
     2  Department of General Services, its successors or assigns, and
     3  to be financed from General Fund current revenues, are hereby
     4  itemized, together with their respective estimated financial
     5  costs, as follows:
     6                                                           Total
     7                                                          Project
     8             Project                                    Allocation
     9  (1)  Department of Corrections
    10     (i)  State Correctional Institution at Laurel
    11         Highlands
    12         (A)  Lease and/or purchase an emergency
    13             housing facility along with related
    14             infrastructure improvements                 2,500,000
    15             (Base Project Allocation - $2,500,000)
    16     (ii)  State Correctional Institution at Pine
    17         Grove
    18         (A)  Lease and/or purchase an emergency
    19             housing facility along with related
    20             infrastructure improvements                 2,500,000
    21             (Base Project Allocation - $2,500,000)
    22     (iii)  State Correctional Institution at
    23         Retreat
    24         (A)  Lease and/or purchase an emergency
    25             housing facility along with related
    26             infrastructure improvements                 2,500,000
    27             (Base Project Allocation - $2,500,000)
    28  (2)  Pennsylvania Historical and Museum Commission
    29     (i)  Pennsylvania Military Museum
    30         (A)  Design and construct a 2,500-square-
    20070H1589B1970                 - 56 -     

     1             foot storage building for historical
     2             military vehicles                             600,000
     3             (Base Project Allocation - $500,000)
     4             (Design and Contingencies - $100,000)
     5  Section 12.  Debt authorization.
     6     (a)  Public improvements.--The Governor, Auditor General and
     7  State Treasurer are hereby authorized and directed to borrow
     8  from time to time in addition to any authorization heretofore or
     9  hereafter enacted, on the credit of the Commonwealth, subject to
    10  the limitations provided in the current capital budget, money
    11  not exceeding in the aggregate the sum of $1,122,556,000 as may
    12  be found necessary to carry out the acquisition and construction
    13  of the public improvement projects specifically itemized in a
    14  capital budget.
    15     (b)  Furniture and equipment.--The Governor, Auditor General
    16  and State Treasurer are hereby authorized and directed to borrow
    17  from time to time in addition to any authorization heretofore or
    18  hereafter enacted, on the credit of the Commonwealth, subject to
    19  the limitations provided in the current capital budget, money
    20  not exceeding in the aggregate the sum of $64,846,000 as may be
    21  found necessary to carry out the acquisition and construction of
    22  the public improvement projects consisting of the acquisition of
    23  original movable furniture and equipment specifically itemized
    24  in a capital budget.
    25     (c)  Transportation assistance.--The Governor, Auditor
    26  General and State Treasurer are hereby authorized and directed
    27  to borrow from time to time in addition to any authorization
    28  heretofore or hereafter enacted, on the credit of the
    29  Commonwealth, subject to the limitations provided in the current
    30  capital budget, money not exceeding in the aggregate the sum of
    20070H1589B1970                 - 57 -     

     1  $47,148,000 as may be found necessary to carry out the
     2  acquisition and construction of the transportation assistance
     3  projects specifically itemized in a capital budget.
     4     (d)  (Reserved).
     5     (e)  Flood control.--The Governor, Auditor General and State
     6  Treasurer are hereby authorized and directed to borrow from time
     7  to time in addition to any authorization heretofore or hereafter
     8  enacted, on the credit of the Commonwealth, subject to the
     9  limitations provided in the current capital budget, money not
    10  exceeding in the aggregate the sum of $4,350,000 as may be found
    11  necessary to carry out the acquisition and construction of the
    12  flood control projects specifically itemized in a capital
    13  budget.
    14  Section 13.  Issue of bonds.
    15     The indebtedness authorized in this act shall be incurred
    16  from time to time and shall be evidenced by one or more series
    17  of general obligation bonds of the Commonwealth in such
    18  aggregate principal amount for each series as the Governor, the
    19  Auditor General and the State Treasurer shall determine, but the
    20  latest stated maturity date shall not exceed the estimated
    21  useful life of the projects being financed as stated in section
    22  15.
    23  Section 14.  Estimated useful life and term of debt.
    24     (a)  Estimated useful life.--The General Assembly states that
    25  the estimated useful life of the public improvement projects
    26  itemized in this act is as follows:
    27         (1)  Public improvement projects, 30 years.
    28         (2)  Furniture and equipment projects, 10 years.
    29         (3)  Transportation assistance projects:
    30             (i)  Rolling stock, 15 years.
    20070H1589B1970                 - 58 -     

     1             (ii)  Passenger buses, 12 years.
     2             (iii)  Furniture and equipment, 10 years.
     3             (iv)  All others, 30 years.
     4     (b)  Term of debt.--The maximum term of the debt authorized
     5  to be incurred under this act is 30 years.
     6  Section 15.  Appropriations.
     7     (a)  Public improvements.--The net proceeds of the sale of
     8  the obligations authorized in this act are hereby appropriated
     9  from the Capital Facilities Fund to the Department of General
    10  Services in the maximum amount of $1,122,556,000 to be used by
    11  it exclusively to defray the financial cost of the public
    12  improvement projects specifically itemized in a capital budget.
    13  After reserving or paying the expenses of the sale of the
    14  obligation, the State Treasurer shall pay to the Department of
    15  General Services the moneys as required and certified by it to
    16  be legally due and payable.
    17     (b)  Furniture and equipment.--The net proceeds of the sale
    18  of the obligations authorized in this act are hereby
    19  appropriated from the Capital Facilities Fund to the Department
    20  of General Services in the maximum amount of $64,846,000 to be
    21  used by it exclusively to defray the financial cost of the
    22  public improvement projects consisting of the acquisition of
    23  original movable furniture and equipment specifically itemized
    24  in a capital budget. After reserving or paying the expenses of
    25  the sale of the obligation, the State Treasurer shall pay to the
    26  Department of General Services the moneys as required and
    27  certified by it to be legally due and payable.
    28     (c)  Transportation assistance.--The net proceeds of the sale
    29  of the obligations authorized in this act are hereby
    30  appropriated from the Capital Facilities Fund to the Department
    20070H1589B1970                 - 59 -     

     1  of Transportation in the maximum amount of $47,148,000 to be
     2  used by it exclusively to defray the financial cost of the
     3  transportation assistance projects specifically itemized in a
     4  capital budget. After reserving or paying the expenses of the
     5  sale of the obligation, the State Treasurer shall pay to the
     6  Department of Transportation the moneys as required and
     7  certified by it to be legally due and payable.
     8     (d)  (Reserved).
     9     (e)  Flood control.--The net proceeds of the sale of the
    10  obligations authorized in this act are hereby appropriated from
    11  the Capital Facilities Fund to the Department of Environmental
    12  Protection in the maximum amount of $4,350,000 to be used by it
    13  exclusively to defray the financial cost of the flood control
    14  projects specifically itemized in a capital budget. After
    15  reserving or paying the expenses of the sale of the obligation,
    16  the State Treasurer shall pay to the Department of Environmental
    17  Protection the moneys as required and certified by it to be
    18  legally due and payable.
    19  Section 16.  Federal funds.
    20     In addition to those funds appropriated in section 15, all
    21  moneys received from the Federal Government for the projects
    22  specifically itemized in this act are also hereby appropriated
    23  for those projects.
    24  Section 17.  Delegation.
    25     Notwithstanding any provision of law to the contrary, the
    26  Department of General Services may delegate the design and
    27  construction of the project contained in section 3(9)(iv)(A) to
    28  Drexel University.
    29  Section 18.  Department of Corrections facilities.
    30     (a)  Preemption of local ordinances.--Capital projects in the
    20070H1589B1970                 - 60 -     

     1  category of public improvement projects specifically itemized
     2  for the Department of Corrections in section 3(4)(i), (iii),
     3  (v), (vi), (viii), (xii) and (xiii) are hereby authorized to be
     4  constructed, erected or acquired by the Department of General
     5  Services, its successors or assigns, of the Department of
     6  Corrections, notwithstanding any zoning ordinance, land use
     7  ordinance, building code or other regulation adopted or enacted
     8  by a political subdivision under the authority of any statute or
     9  under the authority of any home rule charter authorized and
    10  adopted under any statute or the Constitution of Pennsylvania.
    11     (b)  Preemption of local ordinances for 2005-2006 projects.--
    12  Capital projects in the category of public improvement projects
    13  specifically itemized for the Department of Corrections in
    14  section 3(5)(iv.2)(A), (iv.4)(A) and (v.1)(A) of the act of July
    15  7, 2006 (P.L.390, No.83), known as the Capital Budget Project
    16  Itemization Act of 2005-2006, are hereby authorized to be
    17  constructed, erected or acquired by the Department of General
    18  Services, its successors or assigns, of the Department of
    19  Corrections, notwithstanding any zoning ordinance, land use
    20  ordinance, building code or other regulation adopted or enacted
    21  by a political subdivision under the authority of any statute or
    22  under the authority of any home rule charter authorized and
    23  adopted under any statute or the Constitution of Pennsylvania.
    24     (c)  Preemption of local ordinances for 2001-2002 projects.--
    25  The capital projects in the category of public improvement
    26  projects specifically itemized for the Department of Corrections
    27  in section 3(4)(xi)(A) of the act of October 30, 2002 (P.L.891,
    28  No.131), known as the Capital Budget Project Itemization Act of
    29  2001-2002, are hereby authorized to be constructed, erected or
    30  acquired by the Department of General Services, its successors
    20070H1589B1970                 - 61 -     

     1  or assigns, of the Department of Corrections, notwithstanding
     2  any zoning ordinance, land use ordinance, building code or other
     3  regulation adopted or enacted by a political subdivision under
     4  the authority of any statute or under the authority of any home
     5  rule charter authorized and adopted under any statute or the
     6  Constitution of Pennsylvania.
     7  Section 19.  Editorial changes.
     8     In editing and preparing this act for printing following the
     9  final enactment, the Legislative Reference Bureau shall insert
    10  or revise letters or numbers for projects where the letters or
    11  numbers are missing or require revision. The bureau shall also
    12  revise the total monetary amounts for the total authorization,
    13  debt authorization, appropriations and departmental totals as
    14  necessary to agree with the total monetary amounts of the
    15  projects.
    16  Section 20.  Effective date.
    17     This act shall take effect July 1, 2007, or immediately,
    18  whichever is later.