                                 SENATE AMENDED
        PRIOR PRINTER'S NOS. 3600, 4006, 4161         PRINTER'S NO. 4279

THE GENERAL ASSEMBLY OF PENNSYLVANIA


HOUSE BILL

No. 2468 Session of 2006


        INTRODUCED BY GOOD, GEIST AND McCALL, FEBRUARY 15, 2006

        SENATOR WENGER, APPROPRIATIONS, IN SENATE, RE-REPORTED AS
           AMENDED, JUNE 19, 2006

                                     AN ACT

     1  Providing for the highway capital budget project itemization for
     2     the fiscal year 2005-2006.

     3     The General Assembly of the Commonwealth of Pennsylvania
     4  hereby enacts as follows:
     5                             CHAPTER 1
     6                         GENERAL PROVISIONS
     7  Section 101.  Short title.
     8     This act shall be known and may be cited as the Highway
     9  Capital Budget Project Itemization Act of 2005-2006.
    10  Section 102.  Total authorization.
    11     The total authorization for the capital projects itemized in
    12  Chapter 3 and to be constructed by the Department of
    13  Transportation, its successors or assigns and to be financed
    14  from current revenues of the Motor License Fund shall be
    15  $1,504,287,000 $1,662,136,000 $1,713,261,000.                     <--
    16  Section 103.  Itemization of public highway projects.


     1     Additional capital projects in the category of public highway
     2  projects to be constructed by the Department of Transportation,
     3  its successors or assigns and to be financed from current
     4  revenues of the Motor License Fund are itemized in Chapter 3,
     5  together with their respective estimated financial costs.
     6                             CHAPTER 3
     7                         ITEMIZED PROJECTS
     8                                                           Total
     9                                                          Project
    10             Project                                    Allocation
    11  Section 301.  Adams County.
    12     Projects are as follows:
    13         (1)  SR 94 and SR 1019, Realignment of SR
    14             94 and SR 1029, Berlin Road
    15             Intersection, Hamilton Township             4,200,000
    16             (Base Project Allocation - $3,000,000)
    17             (Land Allocation - $600,000)
    18             (Design and Contingencies - $600,000)
    19         (2)  SR 234, Widening, Safety Improvements
    20             and Signalization along SR 234 to SR
    21             3001 and SR 3001 to North Oxford Road,
    22             Tyrone and Huntington Townships             3,200,000
    23             (Base Project Allocation - $1,750,000)
    24             (Land Allocation - $1,200,000)
    25             (Design and Contingencies - $250,000)
    26         (3)  US 15, Construction of Interchange at
    27             US 15 and Hunterstown Road, Strabane
    28             Township                                   13,200,000
    29             (Base Project Allocation - $10,100,000)
    30             (Design and Contingencies - $3,100,000)
    20060H2468B4279                  - 2 -     

     1  Section 302.  Allegheny County.
     2     Projects are as follows:
     3         (1)  SR 8, Highway Restoration, SR 8
     4             Segment 410 to Segment 461, Richland
     5             Township                                      540,000
     6             (Base Project Allocation - $540,000)
     7         (2)  SR 8, Widening and Adding Turning
     8             Lanes to SR 8 at Ewalt Road                 1,550,000
     9             (Base Project Allocation - $1,448,000)
    10             (Land Allocation - $6,000)
    11             (Design and Contingencies - $96,000)
    12         (3)  SR 19, Highway Restoration, SR 19
    13             Segment 60 to Segment 91, Bethel Park
    14             Borough, Mount Lebanon and Upper St.
    15             Clair Townships                               320,000
    16             (Base Project Allocation - $320,000)
    17         (4)  SR 19, Widening and Resurfacing 2.25
    18             Miles                                       9,800,000
    19             (Base Project Allocation - $9,800,000)
    20         (5)  SR 22, Highway Restoration, SR 22
    21             Segment 170 to Segment 221, Collier and
    22             Robinson Townships                            400,000
    23             (Base Project Allocation - $400,000)
    24         (6)  SR 22/286, Cloverleaf Intersection        10,000,000
    25             (Base Project Allocation - $10,000,000)
    26         (7)  SR 28, I-76 to Butler County Line,
    27             Roadway, Bridge, Interchange
    28             Improvements and Interchange
    29             Construction                               31,700,000
    30             (Base Project Allocation - $22,500,000)
    20060H2468B4279                  - 3 -     

     1             (Land Allocation - $2,600,000)
     2             (Design and Contingencies - $6,600,000)
     3         (8)  SR 48, Highway Restoration, SR 48
     4             Segment 350 to Segment 401, Monroeville
     5             Borough                                       324,000
     6             (Base Project Allocation - $324,000)
     7         (9)  SR 48, Widening SR 48 in Monroeville
     8             and North Versailles to Four Lanes from
     9             SR 130 to SR 30                            15,000,000
    10             (Base Project Allocation - $15,000,000)
    11         (10)  SR 50, Highway Restoration, SR 50
    12             Segment 140 to Segment 212, Collier and
    13             Scott Townships, Carnegie and
    14             Heidelberg Boroughs                           510,000
    15             (Base Project Allocation - $510,000)
    16         (11)  SR 60, Highway Restoration, SR 60
    17             Segment 240 to Segment 283 Parkway
    18             West, Moon, North Fayette and Robinson
    19             Townships                                     470,000
    20             (Base Project Allocation - $460,000)
    21             (Design and Contingencies - $10,000)
    22         (12)  SR 60, Capacity Improvements in Moon
    23             Township                                   14,000,000
    24             (Base Project Allocation - $10,000,000)
    25             (Design and Contingencies - $4,000,000)
    26         (13)  SR 286, Construction Phase Funding       30,000,000
    27             (Base Project Allocation - $30,000,000)
    28         (14)  SR 837, Highway Restoration, SR 837
    29             Segment 170 to Segment 210, City of
    30             Clairton, West Mifflin and Dravosburg
    20060H2468B4279                  - 4 -     

     1             Boroughs                                      368,000
     2             (Base Project Allocation - $368,000)
     3         (15)  SR 910, Highway Restoration, SR 910
     4             Segment 390 to Segment 444, Harmar and
     5             Indiana Townships                             370,000
     6             (Base Project Allocation - $370,000)
     7         (16)  SR 910 and SR 8, Widening, Realigning
     8             and Adding Turn Lanes to Intersection       1,950,000
     9             (Base Project Allocation - $1,950,000)
    10         (17)  SR 910 at SR 4031, Widening and
    11             Aligning Intersection, Adding Left Turn
    12             Lanes, Installing Traffic Signal            2,240,000
    13             (Base Project Allocation - $1,194,000)
    14             (Land Allocation - $917,000)
    15             (Design and Contingencies - $129,000)
    16         (18)  SR 910 at SR 4063, Widening and
    17             Aligning Intersection, Adding Left Turn
    18             Lanes, Installing Traffic Signal           3,369,000
    19             (Base Project Allocation - $1,812,000)
    20             (Land Allocation - $1,391,000)
    21             (Design and Contingencies - $166,000)
    22         (19)  SR 910 at SR 4052, Widening SR 910 to
    23             Provide Eastbound and Westbound Left
    24             Turn Lanes, Widening SR 4052 to Provide
    25             Northbound and Southbound Left Turn
    26             Lanes                                       2,043,000
    27             (Base Project Allocation - $1,517,000)
    28             (Land Allocation - $158,000)
    29             (Design and Contingencies - $368,000)
    30         (20)  SR 910 at Cole Road, Installation of
    20060H2468B4279                  - 5 -     

     1             Traffic Signal at Intersection                126,000
     2             (Base Project Allocation - $112,108)
     3             (Design and Contingencies - $13,892)
     4         (21)  SR 2028, Highway Restoration, SR 2028
     5             Segment 80 to Segment 90, City of
     6             Clairton, St. Claire Avenue                    80,000
     7             (Base Project Allocation - $80,000)
     8         (22)  SR 2037, Highway Restoration,
     9             2037/Pt. Perry-Electric Tri-Boro
    10             Expressway, North Versailles Township
    11             and East Pittsburgh Borough                 1,099,000
    12             (Base Project Allocation - $1,089,000)
    13             (Design and Contingencies - $10,000)
    14         (23)  SR 3048, Prestley Street Connector
    15             Project, Connecting West Main Street to
    16             Lane Road, Collier Township                 2,001,000
    17             (Base Project Allocation - $1,477,000)
    18             (Land Allocation - $80,000)
    19             (Design and Contingencies - $444,000)
    20         (24)  SR 3160, Highway Restoration, SR 3160
    21             Segment 10 to Segment 61, Moon
    22             Township                                      636,000
    23             (Base Project Allocation - $636,000)
    24         (25)  SR 4003, Highway Restoration, SR 4003
    25             Segment 10 and Segment 11, McKnight
    26             Road, City of Pittsburgh                      304,000
    27             (Base Project Allocation - $304,000)
    28         (26)  SR 4011 at SR 49, Make Intersection
    29             Into Four-Way Stop, Add Traffic Signal
    30             and Lower Intersection by Six Feet          1,100,000
    20060H2468B4279                  - 6 -     

     1             (Base Project Allocation - $930,000)
     2             (Land Allocation - $60,000)
     3             (Design and Contingencies - $110,000)
     4         (27)  SR 4054 at SR 19, Widen SR 4054
     5             Approach to Provide Left/Left-Through
     6             Right Turn Lanes at SR 19                     517,000
     7             (Base Project Allocation - $446,000)
     8             (Design and Contingencies - $71,000)
     9         (28)  SR 4068 and SR 4031, Reconstruct
    10             Intersection, Realign Roadway, Improve
    11             Drainage and Install Traffic Signal           459,000
    12             (Base Project Allocation - $313,000)
    13             (Land Allocation - $115,000)
    14             (Design and Contingencies - $31,000)
    15         (29)  Northern Pike, Widen Northern Pike in
    16             Monroeville to Four Lanes from Pitcairn
    17             Road to SR 48                               2,000,000
    18             (Base Project Allocation - $2,000,000)
    19         (30)  North Shore Transportation
    20             Connection, Road Improvements, HOV
    21             Modification, City of Pittsburgh              375,000
    22             (Base Project Allocation - $375,000)
    23         (31)  I-79, Road Construction, I-79 to Mon-
    24             Fayette Section of Southern Beltway,
    25             City of Pittsburgh                            300,000
    26             (Base Project Allocation - $300,000)
    27         (32)  US 22, Road Construction, US 22 to I-
    28             79 Section of Southern Beltway, City of
    29             Pittsburgh                                     75,000
    30             (Base Project Allocation - $75,000)
    20060H2468B4279                  - 7 -     

     1         (33)  US 22, Road Construction, US 22 to I-
     2             79 Section of Southern Beltway, City of
     3             Pittsburgh                                    300,000
     4             (Base Project Allocation - $300,000)
     5         (34)  SR 19, Highway Restoration, from
     6             Washington County Line to McLauglin
     7             Road, 0010/0000-0060/0000                     479,000
     8             (Base Project Allocation - $479,000)
     9         (35)  SR 48, Highway Restoration, from SR
    10             148 to SR 2031, 0170/0000-0220/0000           888,000
    11             (Base Project Allocation - $888,000)
    12         (36)  SR 60, Interstate Maintenance, ITS
    13             Expansion SR 60, Robinson Town Center
    14             to Business 60                                345,000
    15             (Base Project Allocation - $300,000)
    16             (Design and Contingencies - $45,000)
    17         (37)  SR 60, Interstate Maintenance,
    18             Parkway West to I-79, 0150/0000-
    19             0240/0000                                   1,100,000
    20             (Base Project Allocation - $1,100,000)
    21         (38)  SR 60, Interstate Maintenance, SR 60
    22             Part 6 and 7 Interstate, Various
    23             Townships                                   3,300,000
    24             (Base Project Allocation - $3,000,000)
    25             (Design and Contingencies - $300,000)
    26         (39)  SR 60, Interstate Maintenance, SR 60
    27             Part 2, CPR, Moon Township                  2,200,000
    28             (Base Project Allocation - $2,000,000)
    29             (Design and Contingencies - $200,000)
    30         (40)  SR 60, Interstate Maintenance, Part 1
    20060H2468B4279                  - 8 -     

     1             Interstate, Moon, North Fayette and
     2             Robinson Townships                            500,000
     3             (Design and Contingencies - $500,000)
     4         (41)  SR 60, Roadway, Safety and Access
     5             Improvements, Improve McClaren Road
     6             Interchange and Other Associated SRs,
     7             Findlay Township                            5,000,000
     8             (Base Project Allocation - $5,000,000)
     9         (42)  I-79, Interstate Painting I-79              800,000
    10             (Base Project Allocation - $800,000)
    11         (43)  SR 28, Road Resurfacing with Bridge
    12             Preservation A45, SR 28                        93,000
    13             (Base Project Allocation - $81,000)
    14             (Design and Contingencies - $12,000)
    15         (44)  SR 28, Road Resurfacing with Bridge
    16             Preservation, SR 28                           220,000
    17             (Base Project Allocation - $192,000)
    18             (Design and Contingencies - $28,000)
    19         (45)  SR 51, Highway Restoration, SR 51
    20             Signal Enhancement, Edgebrook to
    21             Englert                                       102,000
    22             (Base Project Allocation - $100,000)
    23             (Design and Contingencies - $2,000)
    24         (46)  SR 51, Highway Restoration, SR 51
    25             North Signal Enhancements, Coraopolis         142,000
    26             (Base Project Allocation - $140,000)
    27             (Design and Contingencies - $2,000)
    28         (47)  SR 51, Highway Restoration, West End
    29             Bridge to McKees Rocks, 0460/0000-
    30             0490/0000                                   1,000,000
    20060H2468B4279                  - 9 -     

     1             (Base Project Allocation - $1,000,000)
     2         (48)  SR 65, Interstate Preservation and
     3             Restoration 07-08, SR 65 at NI Ramps,
     4             Various Townships                             617,000
     5             (Base Project Allocation - $536,000)
     6             (Design and Contingencies - $81,000)
     7         (49)  SR 65, Interstate Restoration and
     8             Preservation 07-08, SR 65 at NI Ramps,
     9             Various Townships                             617,000
    10             (Base Project Allocation - $536,000)
    11             (Design and Contingencies - $81,000)
    12         (50)  SR 79, Bridge and Highway
    13             Restoration, Interstate 07-08, Neville
    14             Top, Aleppo and Robinson Townships,
    15             Glenfield Borough                             800,000
    16             (Base Project Allocation - $800,000)
    17         (51)  SR 79, Preventive Maintenance and
    18             Bridge Replacement, I-
    19             79/Neville/Killbuck-I-279, Various
    20             Townships                                   5,500,000
    21             (Base Project Allocation - $5,500,000)
    22         (52)  SR 79, Interstate Maintenance, I-
    23             79/35M Preparatory Work, Various
    24             Townships                                   1,060,000
    25             (Base Project Allocation - $1,060,000)
    26         (53)  SR 79, Bridge Preservation - 7,
    27             Interstate Preservation 2007-2008,
    28             Aleppo Township, Glenfield Borough            800,000
    29             (Base Project Allocation - $800,000)
    30         (54)  SR 79, Interstate Maintenance, ITS
    20060H2468B4279                 - 10 -     

     1             Expansion I-79, I-297 to I-76                 118,000
     2             (Design and Contingencies - $118,000)
     3         (55)  SR 79, Interstate Maintenance, Mill
     4             and Overlay, I-79 Part 4 Interstate,
     5             Kennedy and Robinson Townships              1,250,000
     6             (Base Project Allocation - $1,200,000)
     7             (Design and Contingencies - $50,000)
     8         (56)  SR 79, Interstate Maintenance, Mill
     9             and Overlay, I-79 Part 4 Interstate,
    10             Kennedy and Robinson Townships              1,250,000
    11             (Base Project Allocation - $1,200,000)
    12             (Design and Contingencies - $50,000)
    13         (57)  SR 130, Highway Restoration,
    14             Allegheny River Boulevard Signal
    15             Enhancement, Penn Hills Township              102,000
    16             (Base Project Allocation - $100,000)
    17             (Design and Contingencies - $2,000)
    18         (58)  SR 279, Interstate Maintenance CPR,
    19             I-279 Part 5, 6 and 7 CPR, Pittsburgh,
    20             Various Townships                           4,400,000
    21             (Base Project Allocation - $4,000,000)
    22             (Design and Contingencies - $400,000)
    23         (59)  SR 279, Interstate Maintenance CPR,
    24             I-279 Part 5, 6 and 7 CPR, Various
    25             Townships                                   4,400,000
    26             (Base Project Allocation - $4,000,000)
    27             (Design and Contingencies - $400,000)
    28         (60)  SR 279, Interstate Maintenance, ITS
    29             Expansion I-279, Camp Horne to I-79            96,000
    30             (Design and Contingencies - $96,000)
    20060H2468B4279                 - 11 -     

     1         (61)  SR 279, Interstate Maintenance, ETS
     2             Expansion I-279/PA 65, North Shore
     3             Expressway                                    483,000
     4             (Base Project Allocation - $420,000)
     5             (Design and Contingencies - $63,000)
     6         (62)  SR 279, Interstate Maintenance, Fort
     7             Duquesne Bridge and Ramps, City of
     8             Pittsburgh                                    982,000
     9             (Base Project Allocation - $854,000)
    10             (Design and Contingencies - $128,000)
    11         (63)  SR 366, Highway Restoration, from
    12             Bull Creek Road to the Tarentum Bridge,
    13             0012/0000-0032/0400, Tarentum Borough         234,000
    14             (Base Project Allocation - $234,000)
    15         (64)  SR 376, Rehabilitation Includes
    16             Concrete Wall and Ceiling Repairs,
    17             Facade Repairs, Fan and Fanhouse
    18             Repair, Replacement of Lighting and
    19             Electrical Systems, City of Pittsburgh      4,400,000
    20             (Base Project Allocation - $4,000,000)
    21             (Design and Contingencies - $400,000)
    22         (65)  SR 376, Bridge Preservation and
    23             Highway Restoration and Signing
    24             Interstates 07-08, City of Pittsburgh       4,066,000
    25             (Base Project Allocation - $3,256,000)
    26             (Design and Contingencies - $810,000)
    27         (66)  SR 376, Bridge Preservation and
    28             Highway Restoration, 07-08, City of
    29             Pittsburgh                                  3,222,000
    30             (Base Project Allocation - $2,844,000)
    20060H2468B4279                 - 12 -     

     1             (Design and Contingencies - $378,000)
     2         (67)  SR 376, Interstate Maintenance, Mill
     3             and Overlay, I-376, Part 4 and 5,
     4             Churchill and Monroeville Boroughs,
     5             Penn Hills and Wilkins Townships            5,500,000
     6             (Base Project Allocation - $5,000,000)
     7             (Design and Contingencies - $500,000)
     8         (68)  SR 376, Interstate Maintenance, I-376
     9             Parkway Electrical, City of Pittsburgh,
    10             Various Boroughs                              900,000
    11             (Base Project Allocation - $800,000)
    12             (Design and Contingencies - $100,000)
    13         (69)  SR 376, Interstate Maintenance, I-376
    14             Parkway Walls, Various Townships              500,000
    15             (Design and Contingencies - $500,000)
    16         (70)  SR 376, Interstate Maintenance,
    17             Electrical, I-376 Parkway, Various
    18             Townships                                     900,000
    19             (Base Project Allocation - $800,000)
    20             (Design and Contingencies - $100,000)
    21         (71)  SR 376, Interstate Maintenance, Mill
    22             and Overlay, I-376, Part 4 and 5,
    23             Various Townships                           5,500,000
    24             (Base Project Allocation - $5,000,000)
    25             (Design and Contingencies - $500,000)
    26         (72)  SR 376, Highway Restoration, Squirrel
    27             Hill Tunnel Rehabilitation, City of
    28             Pittsburgh                                  4,400,000
    29             (Base Project Allocation - $4,000,000)
    30             (Design and Contingencies - $400,000)
    20060H2468B4279                 - 13 -     

     1         (73)  SR 376, Bridge and Highway
     2             Restoration, 07-08, I-376-2 Phase 2
     3             Interstate and Phase I Signing, City of
     4             Pittsburgh                                  7,238,000
     5             (Base Project Allocation - $6,437,000)
     6             (Design and Contingencies - $801,000)
     7         (74)  SR 376, Bridge and Highway
     8             Restoration, 07-08, I-376-3 Phase 3,
     9             Interstate, Various Townships               3,229,000
    10             (Base Project Allocation - $2,851,000)
    11             (Design and Contingencies - $378,000)
    12         (75)  SR 376, Interstate Maintenance,
    13             Parkway Walls, I-376, City of
    14             Pittsburgh, Various Municipalities            500,000
    15             (Design and Contingencies - $500,000)
    16         (76)  SR 376, Interstate Maintenance, ITS
    17             Expansion I-376, Penn Hills to I-76           660,000
    18             (Base Project Allocation - $660,000)
    19         (77)  SR 376, Highway Restoration,
    20             Beechwood Boulevard Ramp to I-376 East,
    21             Squirrel Hill, City of Pittsburgh              52,000
    22             (Base Project Allocation - $40,000)
    23             (Design and Contingencies - $12,000)
    24         (78)  SR 400, Highway Restoration, from
    25             Penn Circle to Near Entrance to
    26             Shopping Center, 0090/0080-0090/1225          315,000
    27             (Base Project Allocation - $315,000)
    28         (79)  SR 400, Highway Restoration, from
    29             Concrete Section to SR 8, 0090/1225-
    30             0120/0000                                     165,000
    20060H2468B4279                 - 14 -     

     1             (Base Project Allocation - $165,000)
     2         (80)  SR 579, Interstate Maintenance,
     3             Roadway Bridge Patch and Overlay, I-579
     4             Part 1, Veteran's Bridge/Town, City of
     5             Pittsburgh                                  4,310,000
     6             (Base Project Allocation - $4,000,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $290,000)
     9         (81)  SR 579, Interstate Maintenance,
    10             Roadway Bridge Patch and Overlay, I-579
    11             Part 1, Veteran's Bridge/Town, City of
    12             Pittsburgh                                  4,310,000
    13             (Base Project Allocation - $4,000,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $290,000)
    16         (82)  SR 885, Highway Restoration, from SR
    17             885 to Ravensburg Road, 0010/0000-
    18             0030/0000                                     168,000
    19             (Base Project Allocation - $168,000)
    20         (83)  SR 2048, Highway Restoration, from
    21             Bridge over Thompson Run to SR 48,
    22             0050/1252-0110/0000                           735,000
    23             (Base Project Allocation - $735,000)
    24         (84)  SR 3069, Highway Restoration, SR 3069
    25             Improvement                                   200,000
    26             (Base Project Allocation - $200,000)
    27         (85)  SR 6279, Bridge and Highway
    28             Restoration, Interstates 07-08, City of
    29             Pittsburgh                                  1,337,000
    30             (Base Project Allocation - $1,160,000)
    20060H2468B4279                 - 15 -     

     1             (Design and Contingencies - $177,000)
     2         (86)  SR 6279, Bridge and Highway
     3             Restoration, Interstates 07-08, HOV
     4             Section, Patch and Grind, City of
     5             Pittsburgh                                  1,359,000
     6             (Base Project Allocation - $1,182,000)
     7             (Design and Contingencies - $177,000)
     8         (87)  Various, Highway Restoration and Full
     9             Bridge Painting, Allegheny River
    10             Crossing, 40th Street Bridge, City of
    11             Pittsburgh                                  4,460,000
    12             (Base Project Allocation - $4,000,000)
    13             (Land Allocation - $60,000)
    14             (Design and Contingencies - $400,000)
    15         (88)  Various, Bridge and Highway
    16             Restoration, Interstates 07-08, Bridge
    17             Preventative Maintenance/46 Dam
    18             Replacement, Various Townships                452,000
    19             (Base Project Allocation - $420,000)
    20             (Design and Contingencies - $32,000)
    21         (89)  Various, Bridge Preventative
    22             Maintenance/46 Dam Replacement                242,000
    23             (Base Project Allocation - $210,000)
    24             (Design and Contingencies - $32,000)
    25         (90)  SR 28, BRIDGE PRESERVATION, O'HARA,                  <--
    26             SPRINGDALE, FRAZIER, EASTER AND DEER
    27             TOWNSHIPS                                     895,000
    28             (BASE PROJECT ALLOCATION - $895,000)
    29         (91)  I-79, INTERSTATE MAINTENANCE I-79 AT                 <--
    30             SR 51, ROBINSON TOWNSHIP                      200,000
    20060H2468B4279                 - 16 -     

     1             (BASE PROJECT ALLOCATION - $200,000)
     2         (92)  I-579, INTERSTATE RESTORATION FROM
     3             THE BOULEVARD OF THE ALLIES TO VETERANS
     4             BRIDGE                                        960,000
     5             (BASE PROJECT ALLOCATION - $960,000)
     6         (93)  I-376, PENNSYLVANIA TURNPIKE AT
     7             MONROEVILLE AND ALONG I-376, I-279,
     8             REDESIGNATION SIGNAGE, SR 22 AND SR 60
     9             END AT BEAVER COUNTY LINE                   4,420,000
    10             (BASE PROJECT ALLOCATION - $2,820,000)
    11             (LAND ALLOCATION - $1,600,000)
    12  Section 303.  Armstrong County.
    13     Projects are as follows:
    14         (1)  SR 28/66, Highway Reconstruction,
    15             Goheenville Dip, Boggs and Wayne
    16             Townships                                   1,000,000
    17             (Base Project Allocation - $600,000)
    18             (Land Allocation - $300,000)
    19             (Design and Contingencies - $100,000)
    20         (2)  SR 28, Kittanning to Jefferson County
    21             Line, Roadway, Bridge, Interchange
    22             Improvements and Interchange
    23             Construction                               35,050,000
    24             (Base Project Allocation - $26,250,000)
    25             (Land Allocation - $2,100,000)
    26             (Design and Contingencies - $6,700,000)
    27         (3)  SR 28/128, Park and Ride Construction,
    28             Slatelick Park-n-Ride, Bell and
    29             Henderson Townships                           110,000
    30             (Base Project Allocation - $80,000)
    20060H2468B4279                 - 17 -     

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $10,000)
     3         (4)  SR 28, Highway Reconstruction, PA 28
     4             Avenue Gap PM                               1,400,000
     5             (Base Project Allocation - $1,000,000)
     6             (Land Allocation - $200,000)
     7             (Design and Contingencies - $200,000)
     8         (5)  SR 268, Park and Ride Expansion, PA
     9             268 West Kittanning Park-n-Ride, West
    10             Kittanning Borough                             86,000
    11             (Base Project Allocation - $60,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $6,000)
    14         (6)  SR 268, Intersection Safety
    15             Improvements, PA 268 and SR 1038
    16             Intersection, West Kittanning Borough         242,000
    17             (Base Project Allocation - $200,000)
    18             (Land Allocation - $7,000)
    19             (Design and Contingencies - $35,000)
    20         (7)  SR 356, Highway Reconstruction,
    21             Freeport Bridge Ramps, Freeport
    22             Borough                                     1,220,000
    23             (Base Project Allocation - $1,000,000)
    24             (Land Allocation - $80,000)
    25             (Design and Contingencies - $140,000)
    26         (8)  SR 1003, Slide Repair, South Mahoning
    27             Slide, Pine Township                          260,000
    28             (Base Project Allocation - $260,000)
    29         (9)  Rail Siding, Rail Siding Construction,
    30             Freeport Terminals, Freeport Borough        1,054,000
    20060H2468B4279                 - 18 -     

     1             (Base Project Allocation - $906,000)
     2             (Land Allocation - $64,000)
     3             (Design and Contingencies - $84,000)
     4  Section 304.  Beaver County.
     5     Projects are as follows:
     6         (1)  SR 18, Highway Restoration, SR 18,
     7             Wallace Run Road, SR 351, Big Beaver
     8             Boulevard, Homewood and Koppel                500,000
     9             (Base Project Allocation - $500,000)
    10         (2)  SR 51, Highway Reconstruction, SR 51,
    11             Franklin Avenue Bridge/Ambridge
    12             Aliquippa 2, City of Aliquippa and
    13             Hopewell Township                           1,810,000
    14             (Base Project Allocation - $1,800,000)
    15             (Design and Contingencies - $10,000)
    16         (3)  SR 151, Highway Restoration, SR 151,
    17             Brodhead Road Route 51, Hopewell
    18             Township, South Heights Borough               400,000
    19             (Base Project Allocation - $400,000)
    20         (4)  SR 151, Highway Restoration, SR 151
    21             Segment 10 to Segment 50, Greene,
    22             Independence, Hanover and Raccoon
    23             Townships                                     700,000
    24             (Base Project Allocation - $700,000)
    25         (5)  SR 288, Highway Restoration, SR 288
    26             Segment 100 to Segment 120, Franklin
    27             Township                                      310,000
    28             (Base Project Allocation - $310,000)
    29         (6)  SR 288, Highway Restoration, SR 288
    30             Segment 130 to Segment 150, Franklin
    20060H2468B4279                 - 19 -     

     1             Township                                      310,000
     2             (Base Project Allocation - $310,000)
     3         (7)  SR 588, Highway Restoration, SR 588,
     4             Eastvale Borough, Mercer Bennett Run,
     5             North Sewickley Township                      320,000
     6             (Base Project Allocation - $320,000)
     7         (8)  SR 3017, Highway Restoration, SR
     8             3017/SR 60, Brodhead Road, Center
     9             Township                                      830,000
    10             (Base Project Allocation - $800,000)
    11             (Design and Contingencies - $30,000)
    12         (9)  SR 4028, Highway Restoration, SR
    13             4028/SR 68, Third Street, Beaver
    14             Borough and Vanport Township                  315,000
    15             (Base Project Allocation - $310,000)
    16             (Design and Contingencies - $5,000)
    17         (10)  SR 4035, Highway Restoration, SR 4035
    18             Segment 20 to Segment 50, Brighton
    19             Township                                      310,000
    20             (Base Project Allocation - $310,000)
    21         (11)  SR 4051, Highway Restoration, SR
    22             4051, Buffalo - Gypsy Glen, Beaver
    23             Borough                                       320,000
    24             (Base Project Allocation - $310,000)
    25             (Design and Contingencies - $10,000)
    26         (12)  SR 18, Highway Restoration, Squirrel
    27             Run Road to Route 60, 0300/0000-
    28             0390/0000                                     800,000
    29             (Base Project Allocation - $800,000)
    30         (13)  SR 51, Interstate Maintenance, SR 51
    20060H2468B4279                 - 20 -     

     1             and Franklin AmAliquippa2, North Shore
     2             Expressway                                  1,800,000
     3             (Base Project Allocation - $1,800,000)
     4         (14)  SR 989, Highway Restoration, 0010 to
     5             0060                                          272,000
     6             (Base Project Allocation - $272,000)
     7         (15)  SR 989, Highway Restoration, from SR
     8             65 to Solar Drive, 0010/0000-0060/0000        270,000
     9             (Base Project Allocation - $270,000)
    10         (16)  SR-60, SIGNAGE FOR REDESIGNATION FROM                <--
    11             ALLEGHENY COUNTY TO LAWER                   5,210,000
    12             (BASE PROJECT ALLOCATION - $4,510,000)
    13             (LAND ALLOCATION - $700,000)
    14  Section 305.  Bedford County.
    15     Projects are as follows:
    16         (1)  SR 4009, Safety Improvement, Sunnyside
    17             Road Signal Improvement, Bedford
    18             Borough                                       155,000
    19             (Base Project Allocation - $125,000)
    20             (Land Allocation - $2,000)
    21             (Design and Contingencies - $28,000)
    22         (2)  SR 4009, Safety Improvement, Sunnyside
    23             Road Signal Improvement, Bedford
    24             Borough                                       155,000
    25             (Base Project Allocation - $125,000)
    26             (Land Allocation - $2,000)
    27             (Design and Contingencies - $28,000)
    28  Section 306.  Berks County.
    29     Projects are as follows:
    30         (1)  SR 10, Widening, New Morgan Borough
    20060H2468B4279                 - 21 -     

     1             and Caernarvon Township                    12,500,000
     2             (Base Project Allocation - $10,000,000)
     3             (Design and Contingencies - $2,500,000)
     4         (2)  SR 73, Radius Flattening/Safety, SR
     5             73/1010, Maiden Creek Township                300,000
     6             (Base Project Allocation - $70,000)
     7             (Land Allocation - $200,000)
     8             (Design and Contingencies - $30,000)
     9         (3)  SR 78, I-78 Restoration, Strausstown
    10             to SR 61                                    1,225,000
    11             (Base Project Allocation - $1,125,000)
    12             (Design and Contingencies - $100,000)
    13         (4)  SR 183, Intersection Improvement, SR
    14             183/4016 Jefferson Township                 2,100,000
    15             (Base Project Allocation - $1,400,000)
    16             (Land Allocation - $200,000)
    17             (Design and Contingencies - $500,000)
    18         (5)  SR 183, Intersection Improvements,
    19             Signalization at SR 4016, New
    20             Schaefferstown Road                        10,500,000
    21             (Base Project Allocation - $7,000,000)
    22             (Land Allocation - $1,000,000)
    23             (Design and Contingencies - $2,500,000)
    24         (6)  SR 183, PA 183 Widening, Bern
    25             Township, US 222 to Airport                   400,000
    26             (Base Project Allocation - $400,000)
    27         (7)  SR 183, Highway Widening Between SR
    28             222 and SR 3051, Upper Van Reed Road        3,500,000
    29             (Base Project Allocation - $2,000,000)
    30             (Land Allocation - $1,000,000)
    20060H2468B4279                 - 22 -     

     1             (Design and Contingencies - $500,000)
     2         (8)  SR 183, Intersection Improvements at
     3             SR 4018                                     1,000,000
     4             (Base Project Allocation - $700,000)
     5             (Land Allocation - $100,000)
     6             (Design and Contingencies - $200,000)
     7         (9)  SR 222, US 222 North Corridor EIS,
     8             Ontelaunee Township to Kutztown             9,000,000
     9             (Design and Contingencies - $9,000,000)
    10         (10)  SR 422, West Shore Bypass, Highway
    11             Rehabilitation                              3,150,000
    12             (Base Project Allocation - $2,000,000)
    13             (Land Allocation - $400,000)
    14             (Design and Contingencies - $750,000)
    15         (11)  SR 724, Guiderail/Safety
    16             Improvements, Berks Guiderail Upgrade,
    17             Various Municipalities                        110,000
    18             (Base Project Allocation - $100,000)
    19             (Design and Contingencies - $10,000)
    20         (12)  SR 2005, Congestion Reduction, Route
    21             222 Business CCIP, City of Reading and
    22             Muhlenberg Township                           525,000
    23             (Base Project Allocation - $400,000)
    24             (Design and Contingencies - $125,000)
    25         (13)  SR 2005, Intersection Improvements,
    26             Signalization at SR 1010, Park Road,
    27             and Relocation of SR 222 Ramp               2,000,000
    28             (Base Project Allocation - $1,600,000)
    29             (Land Allocation - $100,000)
    30             (Design and Contingencies - $300,000)
    20060H2468B4279                 - 23 -     

     1         (14)  I-76, Improvements in New Morgan
     2             Borough                                    25,000,000
     3             (Base Project Allocation - $21,250,000)
     4             (Design and Contingencies - $3,750,000)
     5         (15)  SR 78, Berks Bridge Under Clearance,
     6             Bethel, Upper Bern, Upper Tulpehocken
     7             Townships                                     100,000
     8             (Design and Contingencies - $100,000)
     9         (16)  SR 222, Safety Improvements and
    10             Congestion Reduction, 222 North
    11             Corridor, City of Reading                   5,950,000
    12             (Base Project Allocation - $4,000,000)
    13             (Land Allocation - $250,000)
    14             (Design and Contingencies - $1,700,000)
    15         (17)  SR 222, Corridor Safety Improvements
    16             and Traffic Calming, Muhlenberg
    17             Township 222, Muhlenberg Township                   0  <--
    18             TOWNSHIP 222, MUHLENBERG TOWNSHIP             250,000  <--
    19             (BASE PROJECT ALLOCATION - $250,000)
    20         (18)  SR 422, Signal Coordination and
    21             Congestion Reduction, 422 Corridor
    22             Phase 3, Exeter Township                      150,000
    23             (Base Project Allocation - $150,000)
    24         (19)  Rail Crossing Signalization Upgrade,
    25             Hill Road Railroad Crossing, Blandon
    26             Township                                       18,000
    27             (Base Project Allocation - $18,000)
    28         (20)  Rail Crossing Signalization Upgrade,
    29             Main Street Railroad Crossing, Lyons
    30             Borough                                        18,000
    20060H2468B4279                 - 24 -     

     1             (Base Project Allocation - $18,000)
     2         (21)  Rail Crossing Signalization Upgrade,
     3             East Wesner Railroad Upgrade,
     4             Maidencreek Township                           18,000
     5             (Base Project Allocation - $18,000)
     6         (22)  Replace At-Grade Railroad Crossing
     7             with a Bridge, Krick Lane Bridge, South
     8             Heidelberg Township                           168,000
     9             (Base Project Allocation - $60,000)
    10             (Land Allocation - $18,000)
    11             (Design and Contingencies - $90,000)
    12         (23)  Improved Connection to SR 183, River
    13             Road Extension, City of Reading               500,000
    14             (Base Project Allocation - $500,000)
    15         (24)  Rail Crossing Signalization Upgrade,
    16             Willow Street Railroad Upgrade,
    17             Fleetwood Borough                              65,000
    18             (Base Project Allocation - $65,000)
    19         (25)  SR 422, PREVENTATIVE MAINTENANCE AND                 <--
    20             PAVEMENT RESTORATION, WEST SHORE BYPASS
    21             HIGHWAY, CUMRU TOWNSHIP, CITY OF
    22             READING AND WEST READING BOROUGH            2,920,000
    23             (BASE PROJECT ALLOCATION - $1,560,000)
    24             (LAND ALLOCATION - $160,000)
    25             (DESIGN AND CONTINGENCIES - $1,200,000)
    26         (26)  INTERSECTION OF OLEY TURNPIKE ROAD
    27             AND RITTERS ROAD, EXETER TOWNSHIP,
    28             REALIGNMENT, IMPROVEMENT AND
    29             SIGNALIZATION                               4,500,000
    30             (BASE PROJECT ALLOCATION - $4,500,000)
    20060H2468B4279                 - 25 -     

     1         (27)  SR 562, INTERSECTION WITH RITTERS
     2             ROAD, EXETER TOWNSHIP, ROAD IMPROVEMENT
     3             AND SIGNALIZATION                           4,500,000
     4             (BASE PROJECT ALLOCATION - $4,500,000)
     5  Section 307.  Blair County.
     6     Projects are as follows:
     7         (1)  SR 99, Concrete Rehabilitation,
     8             Greenfield Township                           100,000
     9             (Base Project Allocation - $100,000)
    10         (2)  SR 99, Gabion Wall Repair, I-99,
    11             Allegheny Township                             50,000
    12             (Base Project Allocation - $50,000)
    13  Section 308.  Bradford County (Reserved).                         <--
    14  SECTION 308.  BRADFORD COUNTY.                                    <--
    15     PROJECTS ARE AS FOLLOWS:
    16         (1)  SR 220, SAYRE-ATHENS BYPASS BETTERMENT
    17             PROJECT                                     6,100,000
    18             (BASE PROJECT ALLOCATION - $6,100,000)
    19  Section 309.  Bucks County.
    20     Projects are as follows:
    21         (1)  SR 263, Widening, Channelization,
    22             Signalization and Lighting, PA 263,
    23             County Line to Bristol, Warminster
    24             Township                                      670,000
    25             (Base Project Allocation - $670,000)
    26         (2)  SR 3003, Widening, Safety Improvements
    27             and Signalization along SR 3003, Lower
    28             State Road and Wells Road                     600,000
    29             (Base Project Allocation - $510,000)
    30             (Land Allocation - $60,000)
    20060H2468B4279                 - 26 -     

     1             (Design and Contingencies - $30,000)
     2         (3)  US 13, Reconstruction, Redevelopment
     3             and Beautification, US 13 Corridor          1,250,000
     4             (Base Project Allocation - $1,250,000)
     5         (4)  US 202, Section 700, Parkway Project,
     6             County Line/Parkway Overpass and
     7             Interchange                                20,000,000
     8             (Base Project Allocation - $18,000,000)
     9             (Design and Contingencies - $2,000,000)
    10         (5)  US 202, Section 700 Parkway Project,
    11             Limekiln Pike/Parkway Overpass and
    12             Interchange                                20,000,000
    13             (Base Project Allocation - $18,000,000)
    14             (Design and Contingencies - $2,000,000)
    15         (6)  Protzner Road, Design and
    16             Construction, Protzner Road Connector         800,000
    17             (Base Project Allocation - $800,000)
    18         (7)  Swamp Road, Safety and Roadway
    19             Improvements, Swamp Road Corridor             600,000
    20             (Base Project Allocation - $600,000)
    21  Section 310.  Butler County.
    22     Projects are as follows:
    23         (1)  SR 528, Park and Ride Expansion,
    24             Jackson Township                              110,000
    25             (Base Project Allocation - $84,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $6,000)
    28         (2)  SR 3018, Highway Construction, Rowan
    29             Road, Cranberry Township                      920,000
    30             (Base Project Allocation - $800,000)
    20060H2468B4279                 - 27 -     

     1             (Land Allocation - $80,000)
     2             (Design and Contingencies - $40,000)
     3         (3)  SR 3021, Highway Restoration, Franklin
     4             Road, Cranberry Township                      720,000
     5             (Base Project Allocation - $600,000)
     6             (Land Allocation - $80,000)
     7             (Design and Contingencies - $40,000)
     8         (4)  SR 3022, Highway Reconstruction,
     9             Rochester Road, Cranberry Township            885,000
    10             (Base Project Allocation - $650,000)
    11             (Land Allocation - $200,000)
    12             (Design and Contingencies - $35,000)
    13         (5)  SR 3022, Highway Construction,
    14             Rochester Road, Cranberry Township            885,000
    15             (Base Project Allocation - $650,000)
    16             (Land Allocation - $200,000)
    17             (Design and Contingencies - $35,000)
    18         (6)  US 19, Northwest Connector Project,
    19             Complete the Connection from Powell
    20             Road that Begins at Freedom Road to
    21             Freshcorn Road to SR 19                     2,800,000
    22             (Base Project Allocation - $2,380,000)
    23             (Design and Contingencies - $420,000)
    24         (7)  SR 19, Traffic Study, US 19, Corridor
    25             Study                                       1,670,000
    26             (Base Project Allocation - $1,000,000)
    27             (Land Allocation - $400,000)
    28             (Design and Contingencies - $270,000)
    29         (8)  SR 28/356, Park and Ride Expansion, PA
    30             28/356, Buffalo Township                       86,000
    20060H2468B4279                 - 28 -     

     1             (Base Project Allocation - $60,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $6,000)
     4         (9)  SR 68, Safety Improvement, O'Donnel
     5             Curve                                         490,000
     6             (Base Project Allocation - $400,000)
     7             (Land Allocation - $30,000)
     8             (Design and Contingencies - $60,000)
     9         (10)  I-79/US 422, Park and Ride
    10             Construction, I-79/US 422 Park-n-Ride,
    11             Muddycreek Township                            66,000
    12             (Base Project Allocation - $40,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $6,000)
    15         (11)  Traffic Study, Butler City Traffic
    16             Study Results, Butler City                  1,670,000
    17             (Base Project Allocation - $1,000,000)
    18             (Land Allocation - $400,000)
    19             (Design and Contingencies - $270,000)
    20         (12)  SR 528, PARK AND RIDE EXPANSION,                     <--
    21             JACKSON TOWNSHIP                               96,000
    22             (BASE PROJECT ALLOCATION - $70,000)
    23             (LAND ALLOCATION - $20,000)
    24             (DESIGN AND CONTINGENCIES - $6,000)
    25  Section 311.  Cambria County.
    26     Projects are as follows:
    27         (1)  SR 271, Safety Improvement, Flatten
    28             Curve, Phoebe Court Curves, City of
    29             Johnstown                                     155,000
    30             (Base Project Allocation - $125,000)
    20060H2468B4279                 - 29 -     

     1             (Land Allocation - $2,000)
     2             (Design and Contingencies - $28,000)
     3         (2)  SR 22 FROM SR 22 AND 219 INTERCHANGE,                 <--
     4             EBENSBURG, TO SR 4031 (WEST HIGH
     5             STREET) AND SR 22 INTERCHANGE, CAMBRIA
     6             TOWNSHIP                                      168,000
     7             (BASE PROJECT ALLOCATION - $140,000)
     8             (DESIGN AND CONTINGENCIES - $28,000)
     9         (3)  SR 22 INTERSECTION WITH SR 3032
    10             (MINIMAL ROAD), CAMBRIA TOWNSHIP,
    11             ADDITIONAL TURN LANES AND INCREASED
    12             LENGTH OF EXISTING TURN LANES               2,850,000
    13             (BASE PROJECT ALLOCATION - $1,750,000)
    14             (LAND ALLOCATION - $100,000)
    15             (DESIGN AND CONTINGENCIES - $1,000,000)
    16         (4)  INTERSECTION OF SR 22 AND PENNDOT
    17             DRIVE AND WALMART PLAZA, CAMBRIA
    18             TOWNSHIP, ADDITIONAL TURN LANES             2,000,000
    19             (BASE PROJECT ALLOCATION - $1,500,000)
    20             (LAND ALLOCATION - $100,000)
    21             (DESIGN AND CONTINGENCIES - $400,000)
    22         (5)  SR 22, CAMBRIA TOWNSHIP, FROM GIANT
    23             EAGLE PLAZA TO THE WALMART PLAZA,
    24             CONSTRUCT A NEW SERVICE ROAD AND
    25             INSTALL BARRIER                             5,250,000
    26             (BASE PROJECT ALLOCATION - $3,250,000)
    27             (LAND ALLOCATION - $500,000)
    28             (DESIGN AND CONTINGENCIES - $1,500,000)
    29         (6)  JAMESWAY ROAD TWO-WAY ACCESS NEAR THE
    30             WALMART PLAZA, CAMBRIA TOWNSHIP,
    20060H2468B4279                 - 30 -     

     1             INTERSECTION REALIGNMENT                    3,150,000
     2             (BASE PROJECT ALLOCATION - $1,650,000)
     3             (LAND ALLOCATION - $1,000,000)
     4             (DESIGN AND CONTINGENCIES - $500,000)
     5  Section 312.  Cameron County.
     6     Projects are as follows:
     7         (1)  SR 120, Safety Improvement, Additional
     8             Turn Lane, Emporium Borough                   700,000
     9             (Base Project Allocation - $500,000)
    10             (Land Allocation - $50,000)
    11             (Design and Contingencies - $150,000)
    12  Section 313.  Carbon County.
    13     Projects are as follows:
    14         (1)  SR 80, I-80 White Haven Bridge Repair,
    15             East Side Borough, Kidder Township            850,000
    16             (Base Project Allocation - $770,000)
    17             (Design and Contingencies - $80,000)
    18  Section 314.  Centre County.
    19     Projects are as follows:
    20         (1)  SR 99, ITS Installation, I-99, Port
    21             Matilda to I-80                             2,600,000
    22             (Base Project Allocation - $2,600,000)
    23         (2)  SR 26, Restoration and Rehabilitation,
    24             Pleasant Gap Borough                          525,000
    25             (Base Project Allocation - $400,000)
    26             (Land Allocation - $50,000)
    27             (Design and Contingencies - $75,000)
    28         (3)  SR 26, Restoration and Rehabilitation,
    29             Beaver Avenue Betterment, State College
    30             Borough and College Townships                 400,000
    20060H2468B4279                 - 31 -     

     1             (Base Project Allocation - $300,000)
     2             (Land Allocation - $50,000)
     3             (Design and Contingencies - $50,000)
     4         (4)  SR 26, Safety Improvement, SR 26 and
     5             SR 3011 Sign Installation, College
     6             Township                                      700,000
     7             (Base Project Allocation - $500,000)
     8             (Land Allocation - $50,000)
     9             (Design and Contingencies - $150,000)
    10         (5)  SR 26, Safety Improvement, Additional
    11             Turn Lane, Ferguson Township                  700,000
    12             (Base Project Allocation - $500,000)
    13             (Land Allocation - $50,000)
    14             (Design and Contingencies - $150,000)
    15         (6)  SR 45, Safety Improvement, SR 45 and
    16             SR 3014 Intersection, Harris Township         700,000
    17             (Base Project Allocation - $500,000)
    18             (Land Allocation - $50,000)
    19             (Design and Contingencies - $150,000)
    20         (7)  SR 150, Congestion Reduction, US 150
    21             Corridor, Bellefonte Borough and Spring
    22             Township                                    1,050,000
    23             (Base Project Allocation - $1,000,000)
    24             (Design and Contingencies - $50,000)
    25         (8)  SR 322, Rehabilitation and
    26             Resurfacing, US 322, Resurfacing,
    27             Potter Township                               590,000
    28             (Base Project Allocation - $440,000)
    29             (Land Allocation - $50,000)
    30             (Design and Contingencies - $100,000)
    20060H2468B4279                 - 32 -     

     1         (9)  SR 504, Rehabilitation and Additional
     2             Turn Lane, Wingate Turn Lane, Union and
     3             Boggs Townships                               460,000
     4             (Base Project Allocation - $300,000)
     5             (Land Allocation - $100,000)
     6             (Design and Contingencies - $60,000)
     7         (10)  SR 3014, Safety Improvement, SR 3014
     8             and SR 3018, Intersection Improvements,
     9             State College Borough                         700,000
    10             (Base Project Allocation - $500,000)
    11             (Land Allocation - $50,000)
    12             (Design and Contingencies - $150,000)
    13         (11)  SR 3014, Safety Improvement, Traffic
    14             Management, Patton and Ferguson
    15             Townships, State College Borough              700,000
    16             (Base Project Allocation - $500,000)
    17             (Land Allocation - $50,000)
    18             (Design and Contingencies - $150,000)
    19         (12)  Safety Improvement, University Park
    20             Area, State College Borough                         0  <--
    21             AREA, STATE COLLEGE BOROUGH                   250,000  <--
    22             (BASE PROJECT ALLOCATION - $250,000)
    23  Section 315.  Chester County.
    24     Projects are as follows:
    25         (1)  SR 29, Additional Right and Left
    26             Turning Lanes, PA 29 Phase III, East
    27             Whiteland and Charlestown Townships         2,950,000
    28             (Base Project Allocation - $1,900,000)
    29             (Land Allocation - $400,000)
    30             (Design and Contingencies - $650,000)
    20060H2468B4279                 - 33 -     

     1         (2)  SR 202, Roadway and Bridge
     2             Reconstruction, US 202, Exton Bypass -
     3             Route 29, East Whiteland Township          14,200,000
     4             (Base Project Allocation - $14,200,000)
     5         (3)  SR 1002, Improve Hazardous and
     6             Congested Intersection by Eliminating
     7             Offset and Adding Left Turn Lanes,
     8             Swedesford at Valley Road, Tredyffrin
     9             Township                                      160,000
    10             (Base Project Allocation - $160,000)
    11         (4)  SR 1055, Construct Two-Lane or Three-
    12             Lane Highway on New Alignment, Eagle
    13             Loop Road, South Link, Upper Uwchlan
    14             Township                                    1,020,000
    15             (Base Project Allocation - $1,020,000)
    16         (5)  SR 2020/SR 3053, Extension of SR 2020,
    17             Boot Road, to SR 3053, Viaduct Avenue,
    18             Borough of Downingtown                      4,600,000
    19             (Base Project Allocation - $3,700,000)
    20             (Design and Contingencies - $900,000)
    21         (6)  US 30, Reconstruction, Including
    22             Travel Lanes and Shoulders, From PA 10
    23             to US 30 Business                           1,000,000
    24             (Base Project Allocation - $1,000,000)
    25         (7)  US 202, Section 100 of US 202,
    26             Additional Lane in Each Direction,
    27             Construct Grade Separation
    28             Interchanges                              180,000,000
    29             (Base Project Allocation -
    30             $180,000,000)
    20060H2468B4279                 - 34 -     

     1         (8)  US 202, Paving Corridor from Delaware
     2             Border to High Street, West Chester           800,000
     3             (Base Project Allocation - $800,000)
     4         (9)  PA 100, Provide Four Through Lanes on
     5             PA 100 by Constructing Two Through
     6             Lanes to the East of Ludwigs Corner         1,000,000
     7             (Base Project Allocation - $1,000,000)
     8         (10)  French Creek Parkway, Design and
     9             Construct the French Creek Parkway and
    10             Connector Roads, Phoenixville               1,250,000
    11             (Base Project Allocation - $1,250,000)
    12         (11)  PA-100, CORRIDOR IMPROVEMENTS,                       <--
    13             SECURITY WALL ALONG THE WEST SIDE OF
    14             ROUTE 100 SPUR BETWEEN KIRKLAND ROAD
    15             AND GREENHILL ROAD, WEST GOSHEN
    16             TOWNSHIP                                    2,500,000
    17             (BASE PROJECT ALLOCATION - $2,500,000)
    18         (12)  SR-52, ROUNDABOUT CONSTRUCTION, ROUTE
    19             52                                            650,000
    20             (BASE PROJECT ALLOCATION - $650,000)
    21  Section 316.  Clarion County.
    22     Projects are as follows:
    23         (1)  SR 368, Intersection Improvement, PA
    24             368/T-310 Intersection, Licking
    25             Township                                      785,000
    26             (Base Project Allocation - $580,000)
    27             (Land Allocation - $85,000)
    28             (Design and Contingencies - $120,000)
    29         (2)  SR 68, Safety Improvement, Reidsburg
    30             Bridge Curve, Piney Township                  490,000
    20060H2468B4279                 - 35 -     

     1             (Base Project Allocation - $400,000)
     2             (Land Allocation - $30,000)
     3             (Design and Contingencies - $60,000)
     4         (3)  SR 80, I-80 Mill and Fill Preventative
     5             Maintenance, Clarion, Limestone and
     6             Monroe Townships                              814,000
     7             (Base Project Allocation - $814,000)
     8         (4)  SR 208/338, Safety Improvement, PA 208
     9             and PA 338 Intersection, Beaver and
    10             Knox Townships                                193,000
    11             (Base Project Allocation - $150,000)
    12             (Land Allocation - $8,000)
    13             (Design and Contingencies - $35,000)
    14         (5)  SR 322/66, Safety Improvement, US 322
    15             and PA 66 Intersection, Paint Township        198,000
    16             (Base Project Allocation - $150,000)
    17             (Land Allocation - $13,000)
    18             (Design and Contingencies - $35,000)
    19         (6)  I-80, Preventive Maintenance, Clarion,
    20             I-80 Mill and Fill Preventive
    21             Maintenance                                   815,000
    22             (Base Project Allocation - $785,000)
    23             (Design and Contingencies - $30,000)
    24  Section 317.  Clearfield County.
    25     Projects are as follows:
    26         (1)  SR 80, Runoff Study, I-80, Dubois
    27             Area, Sandy Township                          172,000
    28             (Base Project Allocation - $100,000)
    29             (Land Allocation - $2,000)
    30             (Design and Contingencies - $70,000)
    20060H2468B4279                 - 36 -     

     1         (2)  SR 80, I-80 PM Project 4, Interstate
     2             Maintenance Program, Lawrence, Pine,
     3             Sandy, Union and Washington Townships       2,565,000
     4             (Base Project Allocation - $2,315,000)
     5             (Land Allocation - $250,000)
     6         (3)  SR 153, Safety Improvement, T-384
     7             Intersection, Woodward Township               130,000
     8             (Base Project Allocation - $100,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $20,000)
    11         (4)  SR 53, Additional Turn Lane at Ninth
    12             Street Intersection, Phillipsburg             250,000
    13             (Base Project Allocation - $100,000)
    14             (Design and Contingencies - $150,000)
    15         (5)  SR 219, Safety Improvement, SR 3011
    16             Intersection, Irishtown Road, Bloom
    17             Township                                      235,000
    18             (Base Project Allocation - $160,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $65,000)
    21         (6)  SR 219, Additional Lane, Intersection
    22             Improvements, Sandy Township                  900,000
    23             (Base Project Allocation - $900,000)
    24         (7)  SR 219, Restoration and
    25             Rehabilitation, Luthersburg to Anderson
    26             Creek, Brady and Bloom Townships              662,000
    27             (Base Project Allocation - $600,000)
    28             (Land Allocation - $2,000)
    29             (Design and Contingencies - $60,000)
    30         (8)  SR 219, SAMI, Intersection
    20060H2468B4279                 - 37 -     

     1             Improvements, Bell Township                   672,000
     2             (Base Project Allocation - $600,000)
     3             (Land Allocation - $2,000)
     4             (Design and Contingencies - $70,000)
     5         (9)  SR 219, SAMI, Liberty Boulevard, City
     6             of Dubois                                     260,000
     7             (Base Project Allocation - $200,000)
     8             (Land Allocation - $40,000)
     9             (Design and Contingencies - $20,000)
    10         (10)  SR 219, Restoration and
    11             Rehabilitation, Brady Street Turning
    12             Lane, City of Dubois                          552,000
    13             (Base Project Allocation - $250,000)
    14             (Design and Contingencies - $302,000)
    15         (11)  SR 219, Safety Improvement, Regional
    16             Traffic Study, City of Dubois, Sandy
    17             Township                                      340,000
    18             (Base Project Allocation - $200,000)
    19             (Land Allocation - $40,000)
    20             (Design and Contingencies - $100,000)
    21         (12)  SR 219, Restoration, Rehabilitation
    22             and Bridge Preservation, McGees Mills
    23             to Burnside                                   545,000
    24             (Base Project Allocation - $400,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $125,000)
    27         (13)  SR 219, Highway Restoration, Woodland
    28             to Shawville, Betterment, Bradford and
    29             Goshen Townships                              662,000
    30             (Base Project Allocation - $600,000)
    20060H2468B4279                 - 38 -     

     1             (Land Allocation - $2,000)
     2             (Design and Contingencies - $60,000)
     3         (14)  SR 219, Restoration and
     4             Rehabilitation, DuBois Four Lane
     5             (State), Sandy Township                     1,525,000
     6             (Base Project Allocation - $1,500,000)
     7             (Land Allocation - $25,000)
     8         (15)  SR 219, Safety and Signal
     9             Improvements, City of DuBois                  700,000
    10             (Base Project Allocation - $500,000)
    11             (Land Allocation - $150,000)
    12             (Design and Contingencies - $50,000)
    13         (16)  SR 219, Safety, Alignment and Signal
    14             Improvements, Brady Township                  700,000
    15             (Base Project Allocation - $500,000)
    16             (Land Allocation - $150,000)
    17             (Design and Contingencies - $50,000)
    18         (17)  SR 255, Safety Improvement, Tyler
    19             Intersection, Huston Township                  90,000
    20             (Base Project Allocation - $70,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $10,000)
    23         (18)  SR 255, Safety Improvement, Road
    24             Resurfacing, Huston Township                  280,000
    25             (Base Project Allocation - $180,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $80,000)
    28         (19)  SR 322, Restoration and
    29             Rehabilitation, Rockton Mountain, Union
    30             Township                                      294,000
    20060H2468B4279                 - 39 -     

     1             (Base Project Allocation - $294,000)
     2         (20)  SR 322, Safety and Signal
     3             Improvement, Lawrence Township                700,000
     4             (Base Project Allocation - $500,000)
     5             (Land Allocation - $50,000)
     6             (Design and Contingencies - $150,000)
     7         (21)  SR 453, Restoration and
     8             Rehabilitation, Anderson Creek Bridge
     9             Betterment, Curwensville Borough              174,000
    10             (Base Project Allocation - $120,000)
    11             (Design and Contingencies - $54,000)
    12         (22)  SR 970, Restoration and
    13             Rehabilitation, Woodland to Shawville,
    14             Bradford and Goshen Townships                 662,000
    15             (Base Project Allocation - $600,000)
    16             (Land Allocation - $2,000)
    17             (Design and Contingencies - $60,000)
    18         (23)  SR 4017/SR 255, Safety Improvement,
    19             Lane Addition, Sandy Township                 640,000
    20             (Base Project Allocation - $500,000)
    21             (Land Allocation - $100,000)
    22             (Design and Contingencies - $40,000)
    23         (24)  SR 80, Restoration and
    24             Rehabilitation, Jefferson County Line
    25             to Exit 120, Sandy and Union Townships      2,220,000
    26             (Base Project Allocation - $2,140,000)
    27             (Land Allocation - $80,000)
    28         (25)  SR 80, Milling, Resurfacing, Guide
    29             Rail and Drainage, I-80 PM Project 4,
    30             Various Townships                           2,565,000
    20060H2468B4279                 - 40 -     

     1             (Base Project Allocation - $2,315,000)
     2             (Design and Contingencies - $250,000)
     3         (26)  SR 1001, Restoration and
     4             Rehabilitation, SR 1001 Old Town Road,
     5             Lawrence Township                             450,000
     6             (Base Project Allocation - $150,000)
     7             (Land Allocation - $100,000)
     8             (Design and Contingencies - $200,000)
     9         (27)  SR 4017, Additional Turn Lane, SR
    10             4017 Right Turn Lane, Sandy Township          315,000
    11             (Base Project Allocation - $140,000)
    12             (Land Allocation - $75,000)
    13             (Design and Contingencies - $100,000)
    14         (28)  Railroad, Railroad Safety
    15             Improvements, Clearfield Cluster
    16             Project, Clearfield and Clinton
    17             Counties                                            0  <--
    18             COUNTIES                                      250,000  <--
    19             (BASE PROJECT ALLOCATION - $250,000)
    20         (29)  SR 53, Restoration and Rehabilitation
    21             and Bridge Preservation, McGees Mills
    22             to Burnside, Bell and Burnside
    23             Townships                                     545,000
    24             (Base Project Allocation - $400,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $125,000)
    27  Section 318.  Clinton County.
    28     Projects are as follows:
    29         (1)  SR 150, Restoration and
    30             Rehabilitation, Fishing Creek to Bald
    20060H2468B4279                 - 41 -     

     1             Eagle, Bald Eagle Township                    965,000
     2             (Base Project Allocation - $650,000)
     3             (Land Allocation - $200,000)
     4             (Design and Contingencies - $115,000)
     5         (2)  SR 150, Safety Improvement,
     6             Intersection Improvements, City of Lock
     7             Haven                                         700,000
     8             (Base Project Allocation - $500,000)
     9             (Land Allocation - $50,000)
    10             (Design and Contingencies - $150,000)
    11         (3)  SR 220, Safety Improvement,
    12             Intersection Improvements, Lamar
    13             Township                                      700,000
    14             (Base Project Allocation - $500,000)
    15             (Land Allocation - $50,000)
    16             (Design and Contingencies - $150,000)
    17  Section 319.  Columbia County.
    18     Projects are as follows:
    19         (1)  SR 42 and SR 4009, Intersection
    20             Improvements, Intersection of SR 42 and
    21             SR 4009, Mount Pleasant Township            1,300,000
    22             (Base Project Allocation - $1,000,000)
    23             (Land Allocation - $100,000)
    24             (Design and Contingencies - $200,000)
    25         (2)  SR 80, Safety Improvement, Low Head
    26             Dam Removal, Mount Pleasant and Scott
    27             Townships                                      70,000
    28             (Base Project Allocation - $50,000)
    29             (Design and Contingencies - $20,000)
    30         (3)  Various, Wetlands Monitoring Analysis,
    20060H2468B4279                 - 42 -     

     1             Various Locations                             100,000
     2             (Base Project Allocation - $100,000)
     3         (4)  SR 80, Bridge Deck Patching,
     4             Mifflinville Susquehanna Bridge,
     5             Mifflin and South Centre Townships          1,000,000
     6             (Base Project Allocation - $1,000,000)
     7         (5)  SR 80, HIGHWAY RECONSTRUCTION FROM                    <--
     8             BUCKHORN TO THE MONTOUR COUNTY LINE           470,000
     9             (BASE PROJECT ALLOCATION - $450,000)
    10             (DESIGN AND CONTINGENCIES - $20,000)
    11  Section 320.  Crawford County.
    12     Projects are as follows:
    13         (1)  SR 8, Update Existing Traffic Signals,
    14             PA 8/PA 27, Barber to Schwartz, Geale
    15             to Second Street, City of Titusville          130,000
    16             (Base Project Allocation - $50,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $60,000)
    19         (2)  SR 89, Realignment of S Curve, SR 89
    20             Segment 60, Three Miles North of
    21             Titusville, Oil Creek Township                350,000
    22             (Base Project Allocation - $300,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $40,000)
    25         (3)  SR 79, Interstate Restoration, I-79
    26             Milepost 153.3 to Milepost 165,
    27             Hayfield and Cussewago Townships            1,000,000
    28             (Base Project Allocation - $1,000,000)
    29         (4)  SR 79, IPM Interstate Restoration,
    30             Milepost 153.5 to Milepost 165, I-79
    20060H2468B4279                 - 43 -     

     1             Segment 1530/1531 - 1620/1621,
     2             Cussewago and Hayfield Townships                    0  <--
     3             CUSSEWAGO AND HAYFIELD TOWNSHIPS            2,500,000  <--
     4             (BASE PROJECT ALLOCATION - $2,500,000)
     5         (5)  SR 27, Signal Upgrades, Drainage
     6             Improvements, New Roadway, SR 27 and
     7             North Street Connector, City of
     8             Meadville                                   2,000,000
     9             (Base Project Allocation - $1,000,000)
    10             (Land Allocation - $800,000)
    11             (Design and Contingencies - $200,000)
    12         (6)  SR 20, Turning Radii, Surface
    13             Improvements, Drainage and Realign, SR
    14             198 Realignments, SR 77, 86 and 198,
    15             Blooming Valley Borough and Woodcock
    16             Township                                      660,000
    17             (Base Project Allocation - $600,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $40,000)
    20         (7)  SR 6, Install Signals, Drainage,
    21             Surface Improvements and Pavement
    22             Markings, SR 6, Saegertown
    23             Improvements, Saegertown Borough,
    24             Woodcock and Hayfield Townships             1,060,000
    25             (Base Project Allocation - $800,000)
    26             (Land Allocation - $160,000)
    27             (Design and Contingencies - $100,000)
    28  Section 321.  Cumberland County.
    29     Projects are as follows:
    30         (1)  SR 1006, Construction of an Underpass
    20060H2468B4279                 - 44 -     

     1             on SR 1006 at Stella Street Rail
     2             Crossing                                    8,237,000  <--
     3             CROSSING                                    8,787,000  <--
     4             (Base Project Allocation - $6,887,000)
     5             (LAND ALLOCATION - $550,000)                           <--
     6             (Design and Contingencies - $1,350,000)
     7         (2)  SR 81, I-81 PM Resurfacing, Carlisle
     8             Borough                                       250,000
     9             (Base Project Allocation - $100,000)
    10             (Design and Contingencies - $150,000)
    11  Section 322.  Dauphin County.
    12     Projects are as follows:
    13         (1)  SR 230, Lower Swatara Township,
    14             Improvements to University Drive,
    15             Beginning at SR 230 and Terminating at
    16             the Airport Connector Road                 29,000,000
    17             (Base Project Allocation - $23,000,000)
    18             (Design and Contingencies - $6,000,000)
    19         (2)  Third Street, Road Extension, Third
    20             Street from I-83 to Chestnut Street,
    21             City of Harrisburg                          1,080,000
    22             (Base Project Allocation - $1,080,000)
    23         (3)  SR 2029, I-81 Bridge Preventative
    24             Maintenance, Lower Paxton, East Hanover
    25             and West Hanover Townships                    852,000
    26             (Base Project Allocation - $852,000)
    27         (4)  SR 83, Widen and Interchange
    28             Improvement, I-83 East Shore Section 1,
    29             Swatara, Lower Paxton and Susquehanna
    30             Townships                                     940,000
    20060H2468B4279                 - 45 -     

     1             (Design and Contingencies - $940,000)
     2         (5)  SR 83 AND 2ND STREET, CONSTRUCTION OF                 <--
     3             THE SOUTHERN GATEWAY PROJECT, CITY OF
     4             HARRISBURG                                 20,000,000
     5             (BASE PROJECT ALLOCATION - $15,000,000)
     6             (LAND ALLOCATION - $2,000,000)
     7             (DESIGN AND CONTINGENCIES - $3,000,000)
     8  Section 323.  Delaware County.
     9     Projects are as follows:
    10         (1)  SR 95, Construct New On/Off Ramps from
    11             US 322 at Commodore Barry Bridge to PA
    12             291, Second Street, I-95/322,
    13             Waterfront Access, Chester City                35,000
    14             (Base Project Allocation - $35,000)
    15         (2)  SR 322, Conchester Road, US 322,
    16             Corridor Improvements to Conchester
    17             Road, Widening to Four Lanes,
    18             Construction of Jughandles and
    19             Installation of Median Barriers           117,500,000
    20             (Base Project Allocation - $90,000,000)
    21             (Land Allocation - $14,500,000)
    22             (Design and Contingencies -
    23             $13,000,000)
    24         (3)  SR 491 at Section M00, Corridor
    25             Improvement, Naamans Creek Road             8,000,000
    26             (Base Project Allocation - $8,000,000)
    27         (4)  SR 2016, Signalization Improvements,
    28             Baltimore Avenue/Pike, Media Borough,
    29             Nether Providence                           1,122,000
    30             (Base Project Allocation - $1,122,000)
    20060H2468B4279                 - 46 -     

     1         (5)  SR 3029, SR 3031, SR 3007, SR 0261,
     2             Intersection Improvements in Bethel
     3             Township at Five-Point Intersection of
     4             Valley Brook Road (SR 3029), Chelsea
     5             Road, (SR 3031), Concord Road (SR 3007)
     6             and Foulk Road (SR 0261)                      700,000
     7             (Design and Contingencies - $700,000)
     8         (6)  SR 3023, SR 3029, SR 3046, Llewellyn
     9             Road Realignment in Chester Heights
    10             Borough                                     1,200,000
    11             (Base Project Allocation - $904,000)
    12             (Land Allocation - $200,000)
    13             (Design and Contingencies - $96,000)
    14         (7)  US 1 and SR 452, Middletown Township,
    15             Construction of Loop Road and
    16             Improvements to US 1 and SR 452            12,000,000
    17             (Base Project Allocation - $10,000,000)
    18             (Design and Contingencies - $2,000,000)
    19         (8)  I-95 and SR 322, Interchange and Area
    20             Improvements, Improvement Movement to
    21             Northbound I-95 and Create New Movement
    22             for Southbound I-95                           700,000
    23             (Design and Contingencies - $700,000)
    24  Section 324.  Elk County.
    25     Projects are as follows:
    26         (1)  SR 219, Intersection Improvements, SR
    27             219 Intersection with SR 2003, Horton
    28             Township                                      195,000
    29             (Base Project Allocation - $120,000)
    30             (Land Allocation - $75,000)
    20060H2468B4279                 - 47 -     

     1         (2)  SR 321, Restoration and
     2             Rehabilitation, Wilcox to Kane, Jones
     3             and Wetmore Townships, Kane Borough         1,175,000
     4             (Base Project Allocation - $1,100,000)
     5             (Land Allocation - $75,000)
     6         (3)  SR 219, Safety Improvement, ITS,
     7             Ridgway Borough and Ridgway Township          700,000
     8             (Base Project Allocation - $500,000)
     9             (Land Allocation - $150,000)
    10             (Design and Contingencies - $50,000)
    11         (4)  SR 255, Restoration and
    12             Rehabilitation, Million Dollar Highway,
    13             City of St. Marys                           2,640,000
    14             (Base Project Allocation - $2,400,000)
    15             (Land Allocation - $60,000)
    16             (Design and Contingencies - $180,000)
    17  Section 325.  Erie County.
    18     Projects are as follows:
    19         (1)  SR 5, Highway Restoration, Widening to
    20             Add Lane, 12th Street, Peninsula Drive
    21             to Asbury Road, City of Erie                1,800,000
    22             (Base Project Allocation - $1,600,000)
    23             (Land Allocation - $100,000)
    24             (Design and Contingencies - $100,000)
    25         (2)  SR 426, Update Existing Traffic
    26             Signals, North Center Street, South
    27             Street to Bond Street, City of Corry          130,000
    28             (Base Project Allocation - $50,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $60,000)
    20060H2468B4279                 - 48 -     

     1         (3)  Sassafras Street-Erie County
     2             Convention Center, Construction of a
     3             New Access Road, Intersection
     4             Improvements and Protected Railroad
     5             Crossing from the Bayfront Parkway to
     6             Presque Isle Bay, New Erie Convention
     7             Center on the Sassafras Pier, City of
     8             Erie                                        2,500,000
     9             (Base Project Allocation - $2,500,000)
    10         (4)  SR 6, Widen Lanes, Shoulders and
    11             Construct Turning Lanes, Erie Rural-
    12             Urban Corridor, US 6, Various
    13             Municipalities                                840,000
    14             (Base Project Allocation - $750,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $80,000)
    17         (5)  SR 20, Signal Optimization,
    18             Enhancements, and Minor Geometric
    19             Improvements, SR 20, 26th Street to
    20             French Street CCIP, 26th Street and
    21             Buffalo Road from Hudson and Geist
    22             Street to French Street, City of Erie         110,000
    23             (Base Project Allocation - $65,000)
    24             (Land Allocation - $5,000)
    25             (Design and Contingencies - $40,000)
    26  Section 326.  Fayette County.
    27     Projects are as follows:
    28         (1)  SR 21, Widen SR 21 and SR 166
    29             Intersection to 48 Feet, German
    30             Township                                    4,480,000
    20060H2468B4279                 - 49 -     

     1             (Base Project Allocation - $3,360,000)
     2             (Land Allocation - $700,000)
     3             (Design and Contingencies - $420,000)
     4         (2)  SR 21, Widen SR 21 and S&T Drive
     5             Intersection to 48 Feet, German
     6             Township                                    4,520,000
     7             (Base Project Allocation - $3,440,000)
     8             (Land Allocation - $600,000)
     9             (Design and Contingencies - $480,000)
    10         (3)  SR 21, Widen S&T Drive to Thompson
    11             Crossing to 48 Feet, German, Menallen
    12             and South Union Townships                   3,976,000
    13             (Base Project Allocation - $2,300,000)
    14             (Land Allocation - $1,416,000)
    15             (Design and Contingencies - $260,000)
    16         (4)  SR 21, Widen S&T Drive to Thompson
    17             Crossing to 48 feet, German, Menallen
    18             and South Union Townships                   4,815,000
    19             (Base Project Allocation - $2,668,000)
    20             (Land Allocation - $1,827,000)
    21             (Design and Contingencies - $320,000)
    22         (5)  SR 21, Widen and Upgrade SR 21, Mall
    23             Entrance to SR 40, City of Uniontown
    24             and South Union Township                    1,663,000
    25             (Base Project Allocation - $1,046,000)
    26             (Land Allocation - $477,000)
    27             (Design and Contingencies - $140,000)
    28         (6)  SR 21, Road Improvements, SR 21              400,000
    29             (Base Project Allocation - $400,000)
    30         (7)  SR 40, Safety Improvements, SR 40,
    20060H2468B4279                 - 50 -     

     1             Menallen and Wharton Townships              3,050,000
     2             (Base Project Allocation - $2,000,000)
     3             (Land Allocation - $750,000)
     4             (Design and Contingencies - $300,000)
     5         (8)  SR 40, Widen SR 40 and Redesign and
     6             Construct SR 40 and SR 119 Interchange,
     7             City of Uniontown, South Union and
     8             North Union Townships                       2,400,000
     9             (Base Project Allocation - $2,000,000)
    10             (Land Allocation - $100,000)
    11             (Design and Contingencies - $300,000)
    12         (9)  SR 40, Safety Improvement, Center Turn
    13             Lane, SR 40 from SR 166 to Morgan
    14             Street, Redstone Township                     500,000
    15             (Base Project Allocation - $300,000)
    16             (Land Allocation - $60,000)
    17             (Design and Contingencies - $140,000)
    18         (10)  SR 40, Interchange Reconstruction at
    19             SR 40, SR 119 and SR 3019, Morgantown
    20             Road Interchange, South Union Township      2,400,000
    21             (Base Project Allocation - $2,000,000)
    22             (Land Allocation - $100,000)
    23             (Design and Contingencies - $300,000)
    24         (11)  SR 119, Intersection Improvement, SR
    25             119 at Technology Drive, North Union
    26             Township                                      305,000
    27             (Base Project Allocation - $200,000)
    28             (Land Allocation - $30,000)
    29             (Design and Contingencies - $75,000)
    30         (12)  SR 4020, Widening, Realignment,
    20060H2468B4279                 - 51 -     

     1             Drainage and Resurfacing, SR 4020-03R,
     2             Luzerne Township                              970,000
     3             (Base Project Allocation - $600,000)
     4             (Land Allocation - $200,000)
     5             (Design and Contingencies - $170,000)
     6         (13)  SR 4049, New Road, Companion to Mon-
     7             Fayette Expressway, SR 4049 Northgate
     8             Highway                                       900,000
     9             (Base Project Allocation - $900,000)
    10         (14)  SR 119, Highway Improvements, SR 119,
    11             SR 711 to County Line, Bullskin and
    12             Upper Tyrone Townships                      1,270,000
    13             (Base Project Allocation - $1,000,000)
    14             (Land Allocation - $70,000)
    15             (Design and Contingencies - $200,000)
    16         (15)  SR 40, Highway Improvements, US 40
    17             Upgrades, Wharton Township                    598,000
    18             (Base Project Allocation - $358,000)
    19             (Land Allocation - $90,000)
    20             (Design and Contingencies - $150,000)
    21  Section 327.  Forest County.
    22     Projects are as follows:
    23         (1)  SR 666, Widening, Base, Leveling
    24             Course, Overlay, Shoulders, Drainage
    25             and Guiderail, SR 666, Henry Mill Road
    26             - SR 948, Hickory, Howe and Kingsley
    27             Townships                                     250,000
    28             (Base Project Allocation - $240,000)
    29             (Design and Contingencies - $10,000)
    30  Section 328.  Franklin County.
    20060H2468B4279                 - 52 -     

     1     Projects are as follows:
     2         (1)  SR 2007 and SR 2012, Connect SR 2007,
     3             Old Forge Road to SR 2012, Country Club
     4             Road                                        1,419,000
     5             (Base Project Allocation - $1,419,000)
     6         (2)  SR 3002, REALIGNMENT, WILLIAMSON ROAD,                <--
     7             ANTRIM TOWNSHIP                               500,000
     8             (BASE PROJECT ALLOCATION - $500,000)
     9  Section 329.  Fulton County.
    10     Projects are as follows:
    11         (1)  US 522, Interstate Improvements to US
    12             522 from Gem to Needmore, Bellfast
    13             Township                                   67,000,000
    14             (Base Project Allocation - $67,000,000)
    15  Section 330.  Greene County.
    16     Projects are as follows:
    17         (1)  SR 79, Resurfacing, Shoulder Milled
    18             Rumble Strips and Raised Pavement
    19             Markers, I-79, Greene, Perry and
    20             Whiteley Townships                          4,300,000
    21             (Base Project Allocation - $4,300,000)
    22         (2)  SR 79, Interstate Improvements, Mile
    23             Post 14 to Mile Post 21, Washington and
    24             Franklin Townships                          4,570,000
    25             (Base Project Allocation - $2,000,000)
    26             (Land Allocation - $70,000)
    27             (Design and Contingencies - $2,500,000)
    28         (3)  SR 2026, Intersection Improvements, SR
    29             2026, Franklin, Jefferson, Greene and
    30             Whiteley Townships                             80,000
    20060H2468B4279                 - 53 -     

     1             (Base Project Allocation - $80,000)
     2         (4)  SR 79, I-79 Reconstruction No.1, Perry
     3             and Whiteley Townships                         78,000
     4             (Design and Contingencies - $78,000)
     5  Section 331.  Huntingdon County (Reserved).
     6  Section 332.  Indiana County.
     7     Projects are as follows:
     8         (1)  SR 119, Highway Reconstruction, Wake
     9             Robin Curve, Rayne Township                 1,880,000
    10             (Base Project Allocation - $1,200,000)
    11             (Land Allocation - $400,000)
    12             (Design and Contingencies - $280,000)
    13         (2)  SR 286, Safety Improvements,                          <--
    14             Philadelphia Street Signals, Indiana
    15             Borough                                             0
    16         (2)  (RESERVED).                                           <--
    17         (3)  SR 422, Highway Reconstruction,
    18             Indiana County                              3,000,000
    19             (Base Project Allocation - $2,000,000)
    20             (Land Allocation - $600,000)
    21             (Design and Contingencies - $400,000)
    22         (4)  SR 954, Safety Improvement, PA 954,                   <--
    23             Wayne, Church Signal, Indiana Borough               0
    24         (4)  (RESERVED).                                           <--
    25         (5)  SR 3043, Highway Construction, Rose
    26             Street Extension Line Item, Indiana
    27             Borough                                       870,000
    28             (Base Project Allocation - $600,000)
    29             (Land Allocation - $170,000)
    30             (Design and Contingencies - $100,000)
    20060H2468B4279                 - 54 -     

     1         (6)  SR 4032, Congested Corridor
     2             Improvement, Philadelphia Street
     3             Congested Corridor, Indiana Borough           350,000
     4             (Base Project Allocation - $300,000)
     5             (Design and Contingencies - $50,000)
     6         (7)  SR 422, Highway Preservation, US 422
     7             Expressway/6th Street East PM, White
     8             Township                                      840,000
     9             (Base Project Allocation - $750,000)
    10             (Design and Contingencies - $90,000)
    11         (8)  SR 22, Variable Message Signs, US 22
    12             VMS                                           220,000
    13             (Base Project Allocation - $180,000)
    14             (Design and Contingencies - $40,000)
    15  Section 333.  Jefferson County.
    16     Projects are as follows:
    17         (1)  SR 28, Roadway, Bridge, Interchange
    18             Improvements and Interchange
    19             Construction, Armstrong County Line to
    20             I-80                                        9,190,000
    21             (Base Project Allocation - $6,750,000)
    22             (Land Allocation - $540,000)
    23             (Design and Contingencies - $1,900,000)
    24         (2)  SR 119, Realignment and
    25             Reconstruction, Punxsy Narrows, Bell
    26             and Henderson Townships                     3,120,000
    27             (Base Project Allocation - $1,800,000)
    28             (Land Allocation - $400,000)
    29             (Design and Contingencies - $920,000)
    30         (3)  SR 119, Traffic Study, Punxsutawney
    20060H2468B4279                 - 55 -     

     1             Borough                                        50,000
     2             (Design and Contingencies - $50,000)
     3         (4)  SR 1010, Highway Construction, Old
     4             Clay Plant Road, Brockway Borough             650,000
     5             (Base Project Allocation - $400,000)
     6             (Land Allocation - $150,000)
     7             (Design and Contingencies - $100,000)
     8         (5)  PA 36/436, Intersection Improvement,
     9             PA 36 and 436 Intersection,
    10             Punxsutawney Borough and Young
    11             Township                                      580,000
    12             (Base Project Allocation - $360,000)
    13             (Land Allocation - $140,000)
    14             (Design and Contingencies - $80,000)
    15  Section 334.  Juniata County (Reserved).
    16  Section 335.  Lackawanna County.
    17     Projects are as follows:
    18         (1)  SR 6, Improve Existing Exit, Robert P.
    19             Casey Highway and SR 6006, Carbondale
    20             Township                                      640,000
    21             (Base Project Allocation - $320,000)
    22             (Design and Contingencies - $320,000)
    23         (2)  SR 11, Intersection Improvement, New
    24             Signal, Birney Avenue and Rocky Glen
    25             Road, Moosic Borough                          200,000
    26             (Base Project Allocation - $160,000)
    27             (Design and Contingencies - $40,000)
    28         (3)  SR 3011, Intersection Improvements,
    29             New Signal, Keyser Avenue and Oak
    30             Street, Old Forge Borough                     200,000
    20060H2468B4279                 - 56 -     

     1             (Base Project Allocation - $160,000)
     2             (Design and Contingencies - $40,000)
     3         (4)  SR 3015, Intersection Improvement, New
     4             Signal, Main Street and Third Street,
     5             Moosic Borough                                500,000
     6             (Base Project Allocation - $460,000)
     7             (Design and Contingencies - $40,000)
     8         (5)  SR 6006, Install Concrete Barrier, US
     9             6 and US 11 and Exit 57, Scranton City,
    10             Dickson City Borough                        1,280,000
    11             (Base Project Allocation - $800,000)
    12             (Land Allocation - $80,000)
    13             (Design and Contingencies - $400,000)
    14         (6)  SR 81, Interstate Preventative
    15             Maintenance                                   775,000
    16             (Base Project Allocation - $675,000)
    17             (Design and Contingencies - $100,000)
    18         (7)  SR 81, Bridge Deck Replacement, I-81
    19             FY 5 Bridge Rehabilitation, Various
    20             Municipalities                              2,000,000
    21             (Base Project Allocation - $2,000,000)
    22         (8)  SR 81, Transportation Study,
    23             Lackawanna/Luzerne, Interstate Bridge
    24             PM, Scott Township                            300,000
    25             (Base Project Allocation - $200,000)
    26             (Design and Contingencies - $100,000)
    27         (9)  SR 81, Transportation Study,
    28             Lackawanna/Luzerne, I-2008 PM, City of
    29             Scranton and South Abington Township          775,000
    30             (Base Project Allocation - $675,000)
    20060H2468B4279                 - 57 -     

     1             (Design and Contingencies - $100,000)
     2  Section 336.  Lancaster County.
     3     Projects are as follows:
     4         (1)  SR 441, Road Construction, Alternate
     5             Truck Route for SR 441, Columbia
     6             Borough                                       250,000
     7             (Base Project Allocation - $250,000)
     8         (2)  US 30 and SR 230 4020, Construction of                <--
     9             a Single Point Urban Interchange and
    10             Related Ramp, Lane and Signalization
    11             Improvements at the Intersection of US
    12             30 and SR 230 4020, Harrisburg Pike,                   <--
    13             Manheim Township                           48,580,000
    14             (Base Project Allocation - $18,590,000)
    15             (Design and Contingencies -
    16             $29,990,000)
    17  Section 337.  Lawrence County.
    18     Projects are as follows:
    19         (1)  SR 18, Highway Restoration, SR 18 and
    20             SR 108, East Washington, City of New
    21             Castle                                        433,000
    22             (Base Project Allocation - $423,000)
    23             (Design and Contingencies - $10,000)
    24         (2)  SR 19, Highway Restoration, SR 19,
    25             City of Butler and SR 108, Scott and
    26             Slippery Rock Townships                       500,000
    27             (Base Project Allocation - $500,000)
    28         (3)  SR 60, Construction of Access Ramps,
    29             Millennium Park Access, Neshannock
    30             Township                                      800,000
    20060H2468B4279                 - 58 -     

     1             (Base Project Allocation - $200,000)
     2             (Land Allocation - $400,000)
     3             (Design and Contingencies - $200,000)
     4         (4)  SR 60, Highway Restoration, Ben
     5             Franklin Highway, SR 60 and SR 422,
     6             Neshannock and Union Townships                810,000
     7             (Base Project Allocation - $800,000)
     8             (Design and Contingencies - $10,000)
     9         (5)  SR 208, Highway Restoration, SR 208,
    10             Means-Volant at Pearson, Volant
    11             Borough, Washington and Wilmington
    12             Townships                                     530,000
    13             (Base Project Allocation - $520,000)
    14             (Design and Contingencies - $10,000)
    15         (6)  SR 422, Highway Restoration, SR 422,
    16             Segment 10 to Segment 60, Pulaski
    17             Township                                      630,000
    18             (Base Project Allocation - $ 630,000)
    19         (7)  SR 422, Highway Restoration, SR 422,
    20             Segment 70 to Segment 120, Mahoning and
    21             Pulaski Townships                             630,000
    22             (Base Project Allocation - $630,000)
    23         (8)  PA 60, Construction of Millennium Park
    24             Interchange to Provide Access to
    25             Lawrence County Industrial Park,
    26             Neshannock Township                           210,000
    27             (Base Project Allocation - $210,000)
    28         (9)  SR 60, Interstate Maintenance, I-376-
    29             SR 60 Part 8, 9, 10 CPR, Various
    30             Townships                                   2,700,000
    20060H2468B4279                 - 59 -     

     1             (Base Project Allocation - $2,500,000)
     2             (Design and Contingencies - $200,000)
     3         (10)  SR 488, Highway Restoration, Tower
     4             Road to County Line, 0120/0000 to
     5             0180/2829                                   1,360,000
     6             (Base Project Allocation - $1,260,000)
     7             (Design and Contingencies - $100,000)
     8         (11)  SR 488, Highway Restoration, SR 65 to
     9             Tower Road, 0010/0000-0120/0000               721,000
    10             (Base Project Allocation - $721,000)
    11         (12)  SR 422, Highway Restoration, SR 551
    12             to SR 4007, Matthews Road, 0120/0000-
    13             0160/0000                                     357,000
    14             (Base Project Allocation - $357,000)
    15         (13)  SR 79, Bridge Preservation and
    16             Highway Reconstruction, I-79 Patch and
    17             Overlay Bridge Preservation and Highway
    18             Reconstruction, Plain Grove Township        2,534,000
    19             (Base Project Allocation - $2,434,000)
    20             (Design and Contingencies - $100,000)
    21         (14)  SR 488, Highway Restoration, Morrison
    22             Run to County Line, 0090/0000-
    23             0180/2829                                     535,000
    24             (Base Project Allocation - $535,000)
    25         (15)  SR 422, Highway Restoration, New
    26             Castle to Butler County Line,
    27             0410/0000-0550/1176                         2,400,000
    28             (Base Project Allocation - $2,400,000)
    29         (16)  SR 60, SIGNAGE FOR REDESIGNATION FROM                <--
    30             BEAVER COUNTY TO MERCER COUNTY LINE         2,810,000
    20060H2468B4279                 - 60 -     

     1             (BASE PROJECT ALLOCATION - $2,260,000)
     2             (LAND ALLOCATION - $550,000)
     3  Section 338.  Lebanon County.
     4     Projects are as follows:
     5         (1)  SR 72, I-78 Overhead Bridges, Union,
     6             Bethel, Swatara Townships                     419,000
     7             (Base Project Allocation - $419,000)
     8         (2)  SR 4013, I-81 Overhead Bridge Group,
     9             East Hanover, Union Townships                 290,000
    10             (Base Project Allocation - $215,000)
    11             (Land Allocation - $25,000)
    12             (Design and Contingencies - $50,000)
    13  Section 339.  Lehigh County.
    14     Projects are as follows:
    15         (1)  SR 100, Safety Improvements and Road
    16             Betterment at Shimersville Road
    17             Intersection                                  200,000
    18             (Base Project Allocation - $200,000)
    19         (2)  SR 100, Intersection Upgrade and
    20             Signalization, Claussville and
    21             Kernsville Roads                              300,000
    22             (Base Project Allocation - $300,000)
    23         (3)  SR 100/SR 309, Intersection Upgrade
    24             and Signalization                             300,000
    25             (Base Project Allocation - $300,000)
    26         (4)  SR 100/SR 4003, Intersection
    27             Improvement, Installment of New Traffic
    28             Signals with Left Turn Lanes onto SR
    29             4003, Including Drainage Improvements,
    30             Guiderails, Line Painting, Widening of
    20060H2468B4279                 - 61 -     

     1             Road and New Signs, Lowhill Township        1,750,000
     2             (Base Project Allocation - $1,750,000)
     3         (5)  SR 145, Congestion Reduction, South
     4             4th Street CCIP, City of Allentown            540,000
     5             (Base Project Allocation - $400,000)
     6             (Land Allocation - $40,000)
     7             (Design and Contingencies - $100,000)
     8         (6)  SR 222/SR 863, Intersection
     9             Reconfiguration and Signalization at
    10             Intersection of Schantz Road and SR 222
    11             to Allow for Reduction of Accidents and
    12             Traffic Congestion                          4,000,000
    13             (Base Project Allocation - $4,000,000)
    14         (7)  SR 309, Install Safety and Warning
    15             Devices, Tilgman Street Interchange         3,000,000
    16             (Base Project Allocation - $3,000,000)
    17         (8)  SR 1019, Select Safety Improvements,
    18             Cedar Crest Boulevard                       1,200,000
    19             (Base Project Allocation - $1,200,000)
    20         (9)  SR 309, Highway Safety and Capacity
    21             Improvements, Kidspeace Broadway
    22             Campus                                        180,000
    23             (Base Project Allocation - $180,000)
    24         (10)  SR 222, Right-of-Way Acquisition for
    25             Park-n-Ride, 222 Trexlerstown II,
    26             Wescoville                                    900,000
    27             (Base Project Allocation - $500,000)
    28             (Land Allocation - $400,000)
    29         (11)  US 22, Preconstruction Studies, US
    30             22, Irving Street to Mickley Road, City
    20060H2468B4279                 - 62 -     

     1             of Allentown                                  200,000
     2             (Base Project Allocation - $200,000)
     3         (12)  Upgrade Circuit for Gates and Lights,
     4             31st Street, 31st Street Railroad
     5             Crossing, City of Allentown                    25,000
     6             (Base Project Allocation - $25,000)
     7         (13)  Upgrade Circuit for Gates and Lights,
     8             7th Street Upgrade, 7th Street Railroad
     9             Crossing, City of Allentown                    25,000
    10             (Base Project Allocation - $25,000)
    11         (14)  SR 309, Widen Lanes, Add Turn Lane,
    12             Upgrade Intersection, SR 309/4010
    13             Intersection, North Whitehall Township        300,000
    14             (Base Project Allocation - $300,000)
    15         (15)  I-78, Improvements in and around the
    16             I-78 and PA 100 Interchange, PA 100
    17             Improvements, Area I-78 Interchange and
    18             Schonz Road, City of Allentown              3,750,000
    19             (Base Project Allocation - $3,750,000)
    20         (16)  SR 1002, 22 and 378, Roadway, Safety
    21             and Access Improvements, SR 1002 (Union
    22             Boulevard), SR 22 and SR 378 Roadway
    23             Improvements, City of Allentown             1,750,000
    24             (Base Project Allocation - $1,750,000)
    25  Section 340.  Luzerne County.
    26     Projects are as follows:
    27         (1)  SR 315, Signal Improvement, Laflin
    28             Road to Old Boston Road, Laflin Borough
    29             to Jenkins Township                         1,040,000
    30             (Base Project Allocation - $800,000)
    20060H2468B4279                 - 63 -     

     1             (Land Allocation - $80,000)
     2             (Design and Contingencies - $160,000)
     3         (2)  SR 415, Intersection Improvements to
     4             Address Congestion, Dallas Borough          1,920,000
     5             (Base Project Allocation - $1,200,000)
     6             (Land Allocation - $80,000)
     7             (Design and Contingencies - $640,000)
     8         (3)  SR 424, Extension of SR 424, Hazleton
     9             Beltway to SR 924                          11,600,000
    10             (Base Project Allocation - $8,800,000)
    11             (Land Allocation - $800,000)
    12             (Design and Contingencies - $2,000,000)
    13         (4)  SR 81, Preventative Maintenance, LLTS
    14             Interstate Bridge, Various Townships          350,000
    15             (Base Project Allocation - $200,000)
    16             (Design and Contingencies - $150,000)
    17         (5)  SR 81, Preventative Maintenance, I-81
    18             Southbound Grinding, Various Townships        440,000
    19             (Base Project Allocation - $400,000)
    20             (Design and Contingencies - $40,000)
    21         (6)  SR 81, Interstate Preventative
    22             Maintenance                                   400,000
    23             (Base Project Allocation - $400,000)
    24         (7)  INFRASTRUCTURE DEVELOPMENT OF ROADWAYS                <--
    25             AND INTERSECTION AT OAK STREET/ROUTE
    26             315/I-81/I-476 INTERCHANGE AREA,
    27             PITTSTON AND JENKINS TOWNSHIPS             20,000,000
    28             (BASE PROJECT ALLOCATION - $20,000,000)
    29  Section 341.  Lycoming County.
    30     Projects are as follows:
    20060H2468B4279                 - 64 -     

     1         (1)  Various, Wetlands Monitoring, Various
     2             Locations                                     100,000
     3             (Base Project Allocation - $100,000)
     4         (2)  SR 118, Add Turn Lane, SR 118 and SR
     5             405 Intersection Improvement,
     6             Hughesville Borough                           160,000
     7             (Base Project Allocation - $100,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $40,000)
    10         (3)  SR 220, Turn Lanes and Jughandles,
    11             Pine and Quenshuneny Run Safety
    12             Improvements, Piatt and Woodward
    13             Townships                                      95,000
    14             (Base Project Allocation - $65,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $20,000)
    17         (4)  WETLANDS MONITORING ANALYSIS                 200,000  <--
    18             (BASE PROJECT ALLOCATION - $200,000)
    19  Section 342.  McKean County.
    20     Projects are as follows:
    21         (1)  SR 219, Restoration and
    22             Rehabilitation, Lewis Run to Custer
    23             City, Lafayette and Sergeant Townships        782,000
    24             (Base Project Allocation - $700,000)
    25             (Land Allocation - $2,000)
    26             (Design and Contingencies - $80,000)
    27         (2)  SR 6, Safety Improvement, Signal
    28             Installation, Smethport Borough               700,000
    29             (Base Project Allocation - $500,000)
    30             (Land Allocation - $50,000)
    20060H2468B4279                 - 65 -     

     1             (Design and Contingencies - $150,000)
     2  Section 343.  Mercer County.
     3     Projects are as follows:
     4         (1)  Various, Construct and Monitor
     5             Wetlands, Countywide Wetland Banking,
     6             Various Municipalities in Mercer
     7             County                                        130,000
     8             (Base Project Allocation - $60,000)
     9             (Land Allocation - $30,000)
    10             (Design and Contingencies - $40,000)
    11         (2)  East Lake Road, Road Relocation, East
    12             Lake Road, Pymatuning Township                 25,000
    13             (Base Project Allocation - $25,000)
    14         (3)  SR 58, Signal Timing Optimization,
    15             Traffic Signal Enhancements and Minor
    16             Geometric Improvements, SR 58, SR 173
    17             and SR 58 CCIP, Grove City Borough            120,000
    18             (Base Project Allocation - $75,000)
    19             (Land Allocation - $5,000)
    20             (Design and Contingencies - $40,000)
    21  Section 344.  Mifflin County.
    22     Projects are as follows:
    23         (1)  SR 22, Restoration and Rehabilitation,
    24             Concrete Rehabilitation, Lewistown
    25             Borough to Derry Township                     500,000
    26             (Base Project Allocation - $400,000)
    27             (Design and Contingencies - $100,000)
    28         (2)  SR 1017, Intersection Improvements,
    29             Radius at Logan Street, Lewistown
    30             Borough                                       213,000
    20060H2468B4279                 - 66 -     

     1             (Base Project Allocation - $92,000)
     2             (Land Allocation - $40,000)
     3             (Design and Contingencies - $81,000)
     4         (3)  SR 22, Safety Improvement,
     5             Intersection Improvements, Lewistown
     6             Borough and Derry Township                    700,000
     7             (Base Project Allocation - $500,000)
     8             (Land Allocation - $50,000)
     9             (Design and Contingencies - $150,000)
    10         (4)  SR 1005, Safety Improvement,
    11             Intersection Improvements, Derry
    12             Township                                      700,000
    13             (Base Project Allocation - $500,000)
    14             (Land Allocation - $50,000)
    15             (Design and Contingencies - $150,000)
    16  Section 345.  Monroe County.
    17     Projects are as follows:
    18         (1)  SR 447, Widening and other
    19             Improvements to PA 447 and Brushy
    20             Mountain Road, Stroud Township                675,000
    21             (Base Project Allocation - $435,000)
    22             (Land Allocation - $90,000)
    23             (Design and Contingencies - $150,000)
    24         (2)  SR 447, Widening and Installation of
    25             Southbound Left Turn Lane Approaching
    26             Brushy Mountain Road, Northbound Right
    27             Turn Lane Approaching Brushy Mountain
    28             Road, Northbound Left Turn Lane
    29             Approaching the United Steel Driveway,
    30             Drainage Improvements, Installation of
    20060H2468B4279                 - 67 -     

     1             a Traffic Signal and Associated Work          675,000
     2             (Base Project Allocation - $575,000)
     3             (Design and Contingencies - $100,000)
     4         (3)  SR 611, Highway Reconstruction, Ramp
     5             Reconstruction, Bartonsville
     6             Interchange HOP, Stroud Township            3,000,000
     7             (Base Project Allocation - $3,000,000)
     8         (4)  SR 611, Highway Intersection
     9             Improvements, 5 Point HOP, Mount Pocono
    10             Borough                                       500,000
    11             (Base Project Allocation - $500,000)
    12         (5)  SR 80, CCL-115 Including Interchange,
    13             Tobyhanna Township                            300,000
    14             (Land Allocation - $100,000)
    15             (Design and Contingencies - $200,000)
    16         (6)  SR 80, Construction, I-80 Eastbound,
    17             115 to 380 4" Mill and Overlay,
    18             Tobyhanna Township                            773,000
    19             (Base Project Allocation - $703,000)
    20             (Design and Contingencies - $70,000)
    21         (7)  SR 80, Bridge Repairs, I-80, Pocono
    22             and Smithfield Townships, Stroudsburg
    23             Borough                                       290,000
    24             (Base Project Allocation - $250,000)
    25             (Design and Contingencies - $40,000)
    26         (8)  SR 80, Bridge Repair, Overlay, I-80
    27             Eastbound, I-380 to SR 33, Jackson and
    28             Pocono Townships                            1,380,000
    29             (Base Project Allocation - $1,080,000)
    30             (Land Allocation - $100,000)
    20060H2468B4279                 - 68 -     

     1             (Design and Contingencies - $200,000)
     2         (9)  SR 611, Congested Corridor Improvement
     3             Project, 611 CCIP Phase 2, Stroudsburg
     4             Borough                                       260,000
     5             (Base Project Allocation - $200,000)
     6             (Land Allocation - $60,000)
     7         (10)  I-80, Upgrades and Improvements           3,750,000
     8             (Base Project Allocation - $3,750,000)
     9  Section 346.  Montgomery County.
    10     Projects are as follows:
    11         (1)  SR 202, Reconstruction and Widening,
    12             US 202, Morris Road to PA 63,
    13             Montgomery, Upper and Lower Gwynedd,
    14             Upper Dublin and Whitpain Townships        32,700,000
    15             (Base Project Allocation - $32,700,000)
    16         (2)  SR 309, Integration, Cheltenham Avenue
    17             to PA 63 and the Link from PA 63 to US
    18             202, Cheltenham, Springfield, Upper
    19             Dublin and Whitemarsh Townships            15,000,000
    20             (Base Project Allocation - $15,000,000)
    21         (3)  SR 3051, Widen Replacement Bridge, Old
    22             Betzwood Pedestrian Trail, West
    23             Norriton Township                             800,000
    24             (Base Project Allocation - $800,000)
    25         (4)  SR 4031, Replacement of Signal
    26             Controller equipment, Installation of
    27             Signal Preemption Equipment, Pottstown
    28             Borough and North Coventry Township         2,000,000
    29             (Base Project Allocation - $2,000,000)
    30         (5)  I-476, I-76 and PA 309, Intelligent
    20060H2468B4279                 - 69 -     

     1             Transportation System Deployment along
     2             I-476 Pennsylvania Turnpike Northeast
     3             Extension, PA 309 and I-76 Schuylkill
     4             Expressway                                    800,000
     5             (Base Project Allocation - $800,000)
     6         (6)  SR 1058, Road Construction, SR 1058
     7             Connector Between PA 309 and
     8             Pennsylvania Turnpike Northeast
     9             Extension                                     320,000
    10             (Base Project Allocation - $320,000)
    11         (7)  Lafayette Street, Street Extension and
    12             Interchange Improvements, Lafayette
    13             Street Extension                            2,405,000
    14             (Base Project Allocation - $2,405,000)
    15  Section 347.  Montour County.
    16     Projects are as follows:
    17         (1)  SR 80, Concrete Reconstruction,
    18             Danville Interchange Area, Valley
    19             Township                                      230,000
    20             (Base Project Allocation - $230,000)
    21         (2)  SR 80, Concrete Reconstruction,
    22             Danville Interchange, Valley Township          95,000
    23             (Base Project Allocation - $90,000)
    24             (Design and Contingencies - $5,000)
    25  Section 348.  Northampton County.
    26     Projects are as follows:
    27         (1)  SR 33, Park and Ride Expansion for
    28             Intermodal Services and Congestion
    29             Reduction, Bethlehem Township                 200,000
    30             (Base Project Allocation - $125,000)
    20060H2468B4279                 - 70 -     

     1             (Design and Contingencies - $75,000)
     2         (2)  SR 78, Installation of Closed Circuit
     3             Cameras for ITS CCTV Project Phase 1,
     4             Various Municipalities                        470,000
     5             (Base Project Allocation - $470,000)
     6         (3)  SR 248, Expansion of Intersection at
     7             SR 248 and Blue Mountain Drive                800,000
     8             (Base Project Allocation - $800,000)
     9         (4)  SR 78, Preventative Maintenance, I-78,
    10             PA 412 to Easton and City of Bethlehem        850,000
    11             (Base Project Allocation - $600,000)
    12             (Land Allocation - $100,000)
    13             (Design and Contingencies - $150,000)
    14         (5)  SR 22, SR 33, SR 78, Congestion
    15             Reduction and Safety Project, Freeway
    16             Service Patrol, Various along SR 22, SR
    17             33 and I-78                                   300,000
    18             (Base Project Allocation - $300,000)
    19         (6)  SR 33, Interchange Reconstruction, SR
    20             33 and SR 512 Interchange, Wind Gap
    21             Borough                                       500,000
    22             (Base Project Allocation - $500,000)
    23         (7)  SR 412, Road Reconstruction and
    24             Widening, SR 412 Improvement, SR 412
    25             from I-78 into City of Bethlehem            3,750,000
    26             (Base Project Allocation - $3,750,000)
    27  Section 349.  Northumberland County.
    28     Projects are as follows:
    29         (1)  SR 54, Intersection Improvements             100,000
    30             (Base Project Allocation - $100,000)
    20060H2468B4279                 - 71 -     

     1         (2)  SR 3010, Relocate SR 3010, SR 3010 and
     2             SR 225 Intersection Improvement,
     3             Jackson Township                              250,000
     4             (Base Project Allocation - $200,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $40,000)
     7         (3)  SR 901, Roadway, Safety and Access
     8             Improvements, Vicinity of SR 901 and
     9             Rinehart Food Distribution Center, Coal
    10             Township                                      100,000
    11             (Base Project Allocation - $100,000)
    12  Section 350.  Perry County (Reserved).
    13  Section 351.  Philadelphia County.
    14     Projects are as follows:
    15         (1)  SR 676, Rehabilitation,
    16             Reconstruction, Operational
    17             Improvements, I-95 and Vine Street
    18             Interchange, City of Philadelphia          40,000,000
    19             (Base Project Allocation - $40,000,000)
    20         (2)  SR 3013, Installation of Gateway
    21             Treatment and Landscaping, Planting in
    22             Median on Island Avenue, City of
    23             Philadelphia                                  375,000
    24             (Base Project Allocation - $375,000)
    25         (3)  SR 7301, Removal of Sedgley Avenue
    26             Bridge, City of Philadelphia                1,000,000
    27             (Base Project Allocation - $1,000,000)
    28         (4)  South Philadelphia Access Road, Design
    29             and Construction, Port Access Road from
    30             South Philadelphia Port and Intermodal
    20060H2468B4279                 - 72 -     

     1             Facilities, City of Philadelphia              725,000
     2             (Base Project Allocation - $725,000)
     3         (5)  Old Delaware Avenue, Incorporate
     4             Portion of Old Delaware Avenue as South
     5             Philadelphia Port Access Road, City of
     6             Philadelphia                                  100,000
     7             (Base Project Allocation - $100,000)
     8         (6)  I-95, Roadway, Safety and Access
     9             Improvements, Construct Access Roads
    10             and Roadway Improvements Associated
    11             with a New Food Distribution Center and
    12             Other Development in the Philadelphia
    13             Navy Yard, City of Philadelphia            45,000,000
    14             (Base Project Allocation - $40,000,000)
    15             (Design and Contingencies - $5,000,000)
    16  Section 352.  Pike County.
    17     Projects are as follows:
    18         (1)  SR 84, I-84 Reconstruction, SR 6 to
    19             New York Line, Various Municipalities         400,000
    20             (Design and Contingencies - $400,000)
    21         (2)  SR 84, NEPA SD BDG, I-84 Bridges,
    22             Greene and Palmyra Townships                  725,000
    23             (Base Project Allocation - $500,000)
    24             (Design and Contingencies - $225,000)
    25  Section 353.  Potter County.
    26     Projects are as follows:
    27         (1)  SR 6, Restoration and Rehabilitation
    28             of Coudersport Area, Coudersport
    29             Borough and Eulalia Township                  252,000
    30             (Base Project Allocation - $125,000)
    20060H2468B4279                 - 73 -     

     1             (Land Allocation - $2,000)
     2             (Design and Contingencies - $125,000)
     3         (2)  SR 6, Restoration and Rehabilitation,
     4             US 6, West of Galeton, Pike and Ulysses
     5             Townships                                   1,150,000
     6             (Base Project Allocation - $850,000)
     7             (Land Allocation - $120,000)
     8             (Design and Contingencies - $180,000)
     9         (3)  SR 49, Restoration and Rehabilitation,
    10             Gold Road, Harrison Township                  616,000
    11             (Base Project Allocation - $400,000)
    12             (Land Allocation - $106,000)
    13             (Design and Contingencies - $110,000)
    14         (4)  SR 6, Safety Improvement, Signing and
    15             Delineation, Eulalia Township                 700,000
    16             (Base Project Allocation - $500,000)
    17             (Land Allocation - $50,000)
    18             (Design and Contingencies - $150,000)
    19         (5)  SR 44, Safety Improvement, Roadway
    20             Resurfacing, Eulalia Township                 700,000
    21             (Base Project Allocation - $500,000)
    22             (Land Allocation - $50,000)
    23             (Design and Contingencies - $150,000)
    24  Section 354.  Schuylkill County.
    25     Projects are as follows:
    26         (1)  SR 54, Realign, Widen, Drainage
    27             Improvements and Resurface SR 54 from
    28             SR 309 to I-81                              3,000,000
    29             (Base Project Allocation - $3,000,000)
    30         (2)  SR 61, Safety Improvements from SR
    20060H2468B4279                 - 74 -     

     1             2014, Brick Hill Road to SR 443,
     2             Including the Liberty Street
     3             Intersection                               20,000,000
     4             (Base Project Allocation - $20,000,000)
     5         (3)  SR 61, Construction of Split Pair
     6             North and South Lanes Deer Lake North
     7             Project from SR 895 to SR 2014             42,000,000
     8             (Base Project Allocation - $42,000,000)
     9         (4)  SR 61, Highway Restoration from the
    10             Schuylkill River to the Northern
    11             Borough Line                                5,000,000
    12             (Base Project Allocation - $5,000,000)
    13         (5)  SR 61, Reconstruction of Intersection
    14             at SR 61, SR 2010, Adamsdale Road and
    15             Liberty Street                              3,000,000
    16             (Base Project Allocation - $3,000,000)
    17         (6)  SR 61, Installation of Traffic Light
    18             and Turning Lanes at the Intersection
    19             of SR 61 North and Academy Lane, Butler
    20             Township                                      175,000
    21             (Base Project Allocation - $100,000)
    22             (Land Allocation - $25,000)
    23             (Design and Contingencies - $50,000)
    24         (7)  SR 309, Safety Improvements at SR 309
    25             and SR 54, Rush Township                    1,000,000
    26             (Base Project Allocation - $1,000,000)
    27         (8)  SR 309, Safety Improvement at the
    28             Intersection of SR 309 and SR 895           2,000,000
    29             (Base Project Allocation - $2,000,000)
    30         (9)  SR 309, Safety, Widening and
    20060H2468B4279                 - 75 -     

     1             Signalization Improvements, Central
     2             Business District from the Northern
     3             Borough Line to the Southern Borough
     4             Line                                        5,000,000
     5             (Base Project Allocation - $5,000,000)
     6         (10)  SR 924, Elimination of S Curve, Begin
     7             at the Schuylkill/Luzerne County Line,
     8             Continuation of Project Improvement
     9             Plan for SR 924 adjoining Humboldt
    10             Industrial Park, Black Creek Township,
    11             Luzerne County, to Green Mountain Road      3,000,000
    12             (Base Project Allocation - $3,000,000)
    13         (11)  SR 2014, Reconstruction and Drainage
    14             Improvements to SR 2014 from SR 443 to
    15             SR 61                                       1,000,000
    16             (Base Project Allocation - $1,000,000)
    17         (12)  SR 4034, Rehabilitation and
    18             Resurfacing of SR 4034, Aristes Road,
    19             from SR 4036 to the Columbia County
    20             Line                                        3,000,000
    21             (Base Project Allocation - $3,000,000)
    22         (13)  SR 4036, Rehabilitation and
    23             Resurfacing of SR 4036, Little Mountain
    24             Road, from SR 4033 to the Columbia
    25             County Line                                 2,000,000
    26             (Base Project Allocation - $2,000,000)
    27         (14)  SR 61, Roadway Restoration with
    28             Safety Upgrades, SR 61, Port Clinton,
    29             Port Clinton Borough and West Brunswick
    30             Township                                    1,280,000
    20060H2468B4279                 - 76 -     

     1             (Base Project Allocation - $1,200,000)
     2             (Land Allocation - $40,000)
     3             (Design and Contingencies - $40,000)
     4         (15)  SR 81, I-81 Frackville to Mahanoy
     5             City, Various Townships                     1,265,000
     6             (Base Project Allocation - $1,140,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $105,000)
     9         (16)  SR 81, I-81, SR 25 to SR 901, Mill
    10             and Overlay, Frailey and Foster
    11             Townships                                     720,000
    12             (Base Project Allocation - $600,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $100,000)
    15         (17)  SR 81, I-81 Bridges North of SR 209,
    16             Frailey Township                            2,050,000
    17             (Base Project Allocation - $1,600,000)
    18             (Land Allocation - $50,000)
    19             (Design and Contingencies - $400,000)
    20         (18)  SR 54, RESURFACING AND SHOULDER WORK                 <--
    21             ON SR 54 FROM RUSH AND RYAN TOWNSHIPS
    22             THROUGH MAHANOY CITY TO ST. NICHOLAS
    23             BRIDGE IN MAHANOY TOWNSHIP CONTINUING
    24             ON SR 4030 TO BEGINNING OF GIRARDVILLE
    25             BOROUGH                                     2,000,000
    26             (BASE PROJECT ALLOCATION - $2,000,000)
    27         (19)  SR 61, SAFETY IMPROVEMENTS, SR 61 IN
    28             NORTH MANHEIM AND WEST BRUNSWICK
    29             TOWNSHIPS                                   1,000,000
    30             (BASE PROJECT ALLOCATION - $1,000,000)
    20060H2468B4279                 - 77 -     

     1         (20)  SR 501, TRAFFIC STUDY, SR 501 AND SR
     2             443 IN PINE GROVE BOROUGH                     500,000
     3             (BASE PROJECT ALLOCATION - $500,000)
     4         (21)  SR 81, I-81 FEASIBILITY STUDY FOR A
     5             THIRD LANE ON I-81 NORTH BETWEEN THE
     6             RAVINE AND TREMONT/TOWER CITY EXITS           250,000
     7             (BASE PROJECT ALLOCATION - $250,000)
     8         (22)  SR 309 AND US 209, SAFETY, WIDENING                  <--
     9             AND SIGNALIZATION IMPROVEMENTS, CENTRAL
    10             BUSINESS DISTRICT FROM THE NORTHERN
    11             BOROUGH LINE TO THE SOUTHERN BOROUGH
    12             LINE                                        5,000,000
    13             (BASE PROJECT ALLOCATION - $5,000,000)
    14  Section 355.  Snyder County.
    15     Projects are as follows:
    16         (1)  SR 11, Mill and Overlay Northbound
    17             Lane, Selinsgrove to McKee Half Falls,
    18             Chapman, Franklin and Union Townships       3,520,000
    19             (Base Project Allocation - $3,500,000)
    20             (Design and Contingencies - $20,000)
    21         (2)  SR 11, Mill and Overlay Southbound
    22             Lane, Selinsgrove to McKee Half Falls,
    23             Chapman, Franklin and Union Townships       3,520,000
    24             (Base Project Allocation - $3,500,000)
    25             (Design and Contingencies - $20,000)
    26  Section 356.  Somerset County (Reserved).                         <--
    27  SECTION 356.  SOMERSET COUNTY.                                    <--
    28     PROJECTS ARE AS FOLLOWS:
    29         (1)  SR 601, STREETSCAPE IMPROVEMENTS TO
    30             CHURCH STREET, PLEASANT AVENUE, CENTER
    20060H2468B4279                 - 78 -     

     1             STREET AND RACE STREET                      3,000,000
     2             (BASE PROJECT ALLOCATION - $1,500,000)
     3             (LAND ALLOCATION - $1,200,000)
     4             (DESIGN AND CONTINGENCIES - $300,000)
     5         (2)  SR 601, STREETSCAPE IMPROVEMENTS TO SR                <--
     6             601 IN VICINITY OF SOMERSET HOSPITAL,
     7             BOROUGH OF SOMERSET                         1,500,000
     8             (BASE PROJECT ALLOCATION - $1,200,000)
     9             (DESIGN AND CONTINGENCIES - $300,000)
    10  Section 357.  Sullivan County (Reserved).                         <--
    11  SECTION 357.  SULLIVAN COUNTY.                                    <--
    12     PROJECTS ARE AS FOLLOWS:
    13         (1)  SR 42, SEGMENT 50, SAFETY
    14             IMPROVEMENTS, DAVIDSON AND SHREWSBURY
    15             TOWNSHIPS                                   1,575,000
    16             (BASE PROJECT ALLOCATION - $1,300,000)
    17             (DESIGN AND CONTINGENCIES - $200,000)
    18             (LAND ALLOCATIONS - $75,000)
    19  Section 358.  Susquehanna County.
    20     Projects are as follows:
    21         (1)  SR 11 and SR 171, Corridor
    22             Improvements of SR 11 and SR 171, Great
    23             Bend Township                               3,600,000
    24             (Base Project Allocation - $3,200,000)
    25             (Land Allocation - $80,000)
    26             (Design and Contingencies - $320,000)
    27         (2)  SR 81, I-81 Bridge PM, Lenox and
    28             Harford Townships                             290,000
    29             (Base Project Allocation - $270,000)
    30             (Design and Contingencies - $20,000)
    20060H2468B4279                 - 79 -     

     1         (3)  SR 81, Preventative Maintenance,
     2             Northern Tier 2005 Bridge, Various
     3             Townships                                     260,000
     4             (Base Project Allocation - $260,000)
     5         (4)  SR 81, Interstate Maintenance,
     6             Northern Tier, Lenox and Great Bend
     7             Townships                                     350,000
     8             (Base Project Allocation - $200,000)
     9             (Design and Contingencies - $150,000)
    10         (5)  SR 81, I-81 Exit 218, Gibson and
    11             Harford Townships                             300,000
    12             (Design and Contingencies - $300,000)
    13  Section 359.  Tioga County.
    14     Projects are as follows:
    15         (1)  SR 15 and SR 6015, Wetlands Monitoring
    16             Analysis, Approximately 2.6 Miles,
    17             North of Blossburg Borough, Covington
    18             Township                                      180,000
    19             (Base Project Allocation - $180,000)
    20         (2)  SR 6, Restoration, Mansfield to
    21             Mainsburg Earmark, Mansfield Borough
    22             and Richmond Township                         570,000
    23             (Base Project Allocation - $550,000)
    24             (Design and Contingencies - $20,000)
    25  Section 360.  Union County (Reserved).                            <--
    26  SECTION 360.  UNION COUNTY.                                       <--
    27     PROJECTS ARE AS FOLLOWS:
    28         (1)  SR 11 AND SR 15, DESIGN AND
    29             CONSTRUCTION OF THE CENTRAL SUSQUEHANNA
    30             THRUWAY FROM SR 147 IN NORTHUMBERLAND
    20060H2468B4279                 - 80 -     

     1             COUNTY TO THE INTERSECTION WITH THE
     2             SELINSGROVE BYPASS IN SNYDER COUNTY        95,000,000
     3             (BASE PROJECT ALLOCATION - $95,000,000)
     4  Section 361.  Venango County.
     5     Projects are as follows:
     6         (1)  SR 80, Interstate Restoration,
     7             Interstate Preventative Maintenance, SR
     8             80, Milepost 34 to Milepost 42, Clinton
     9             and Scrubgrass Townships, and
    10             Clintonville Borough                                0  <--
    11             CLINTONVILLE BOROUGH                        2,500,000  <--
    12             (BASE PROJECT ALLOCATION - $2,500,000)
    13         (2)  SR 80, I-80 Milepost 34 to Milepost 42
    14             Interstate Maintenance, Clinton and
    15             Scrubgrass Townships and Clintonville
    16             Borough                                     1,000,000
    17             (Base Project Allocation - $1,000,000)
    18  Section 362.  Warren County (Reserved).
    19  Section 363.  Washington County.
    20     Projects are as follows:
    21         (1)  SR 40, Add Lane, US 40, I-70 to PA 18,
    22             City of Washington                            660,000
    23             (Base Project Allocation - $400,000)
    24             (Land Allocation - $150,000)
    25             (Design and Contingencies - $110,000)
    26         (2)  SR 70, New Interchange, Bentleyville
    27             Interchange, Bentleyville Borough           3,950,000
    28             (Base Project Allocation - $3,000,000)
    29             (Land Allocation - $700,000)
    30             (Design and Contingencies - $250,000)
    20060H2468B4279                 - 81 -     

     1         (3)  SR 70, Addition of Lane, Restoration,
     2             I-70 from I-79 South to I-79 North,
     3             South Strabane Township                     2,900,000
     4             (Base Project Allocation - $2,500,000)
     5             (Land Allocation - $200,000)
     6             (Design and Contingencies - $200,000)
     7         (4)  SR 88, Addition of a Turning Lane and
     8             a Traffic Signal, Intersection of SR 88
     9             and SR 837, New Eagle Borough               1,600,000
    10             (Base Project Allocation - $900,000)
    11             (Land Allocation - $200,000)
    12             (Design and Contingencies - $500,000)
    13         (5)  SR 79, PM 2, South Strabane Township         510,000
    14             (Base Project Allocation - $450,000)
    15             (Design and Contingencies - $60,000)
    16         (6)  SR 70, Reconstruction No.2, I-70,
    17             Buffalo and North Franklin Townships          120,000
    18             (Design and Contingencies - $120,000)
    19         (7)  SR 70, Reconstruction, I-70 South
    20             Junction to SR 519, South Strabane and
    21             Somerset Townships                            120,000
    22             (Design and Contingencies - $120,000)
    23         (8)  SR 19, Corridor Safety Improvement,
    24             Early Options Study, SR 19, Amwell,
    25             Peters, North Strabane and South
    26             Strabane Townships                             20,000
    27             (Design and Contingencies - $20,000)
    28         (9)  SR 70, Interstate Improvements, SR 70,
    29             Milepost 0 to Milepost 18, Donegal,
    30             Buffalo, North Franklin and Canton
    20060H2468B4279                 - 82 -     

     1             Townships and City of Washington            2,570,000
     2             (Base Project Allocation - $2,000,000)
     3             (Land Allocation - $70,000)
     4             (Design and Contingencies - $500,000)
     5         (10)  SR 70, Interstate Improvements, SR
     6             70, Milepost 18 to Milepost 40, South
     7             Strabane, Somerset, Fallowfield
     8             Townships and Bentleyville Borough          2,570,000
     9             (Base Project Allocation - $2,000,000)
    10             (Land Allocation - $70,000)
    11             (Design and Contingencies - $500,000)
    12         (11)  SR 79, Interstate Improvements, SR
    13             79, Milepost 21 to Milepost 34, Amwell
    14             and South Strabane Townships                7,070,000
    15             (Base Project Allocation - $2,000,000)
    16             (Land Allocation - $70,000)
    17             (Design and Contingencies - $5,000,000)
    18         (12)  SR 79, Interstate Improvements, SR
    19             79, Milepost 34 to Milepost 49, Cecil,
    20             Chartiers, North Strabane and South
    21             Strabane Townships and Canonsburg
    22             Borough                                     6,570,000
    23             (Base Project Allocation - $1,500,000)
    24             (Land Allocation - $70,000)
    25             (Design and Contingencies - $5,000,000)
    26         (13)  SR 22, Highway Improvements, SR 22
    27             and State Line to SR 18, Hanover
    28             Township                                    1,270,000
    29             (Base Project Allocation - $1,000,000)
    30             (Land Allocation - $70,000)
    20060H2468B4279                 - 83 -     

     1             (Design and Contingencies - $200,000)
     2         (14)  SR 22, Highway Improvements, SR 22
     3             and SR 18 to County Line, Hanover,
     4             Smith and Robinson Townships                1,270,000
     5             (Base Project Allocation - $1,000,000)
     6             (Land Allocation - $70,000)
     7             (Design and Contingencies - $200,000)
     8  Section 364.  Wayne County (Reserved).
     9  Section 365.  Westmoreland County.
    10     Projects are as follows:
    11         (1)  SR 0, New Roadway, Congestion
    12             Reduction, Jeannette Truck Route, City
    13             of Jeannette                                  864,000
    14             (Base Project Allocation - $750,000)
    15             (Land Allocation - $30,000)
    16             (Design and Contingencies - $84,000)
    17         (2)  SR 30, Corridor Safety, Congestion
    18             Reduction, US 30 Corridor Safety
    19             Improvements, Irwin Borough, Hempfield
    20             and North Huntingdon Townships              3,130,000
    21             (Base Project Allocation - $3,000,000)
    22             (Land Allocation - $30,000)
    23             (Design and Contingencies - $100,000)
    24         (3)  SR 31, Intersection Improvements, SR
    25             31 at Braddock Avenue, Mt. Pleasant
    26             Borough                                       550,000
    27             (Base Project Allocation - $200,000)
    28             (Land Allocation - $150,000)
    29             (Design and Contingencies - $200,000)
    30         (4)  SR 66, Intersection and Approaches
    20060H2468B4279                 - 84 -     

     1             Signal Improvements and Additional
     2             Lane, SR 66, Beaver Run Road,
     3             Washington Township                           910,000
     4             (Base Project Allocation - $160,000)
     5             (Land Allocation - $225,000)
     6             (Design and Contingencies - $525,000)
     7         (5)  SR 982, Signal Enhancements and
     8             Miscellaneous Roadway Work,
     9             Westmoreland County, Traffic Signal
    10             Enhancements, Various Municipalities          667,000
    11             (Base Project Allocation - $480,000)
    12             (Land Allocation - $125,000)
    13             (Design and Contingencies - $62,000)
    14         (6)  SR 1053, Widen and Restoration of
    15             Georges Station Road, Hempfield
    16             Township                                    1,150,000
    17             (Base Project Allocation - $200,000)
    18             (Land Allocation - $500,000)
    19             (Design and Contingencies - $450,000)
    20         (7)  SR 3011, Intersection, Safety and
    21             Drainage Improvements, SR 3011, Finley
    22             Road, Rostraver Township                      370,000
    23             (Base Project Allocation - $300,000)
    24             (Land Allocation - $70,000)
    25         (8)  SR 70, Interstate Improvements, SR 70
    26             Milepost 40 to Milepost 48, Rostraver
    27             and South Huntingdon Townships and
    28             Speers and North Belle Vernon Boroughs      2,570,000
    29             (Base Project Allocation - $2,000,000)
    30             (Land Allocation - $70,000)
    20060H2468B4279                 - 85 -     

     1             (Design and Contingencies - $500,000)
     2         (9)  SR 70, Interstate Improvements, SR 70,
     3             Milepost 48 to Milepost 57.5, South
     4             Huntingdon, Sewickley and Hempfield
     5             Townships and New Stanton Borough           2,570,000
     6             (Base Project Allocation - $2,000,000)
     7             (Land Allocation - $70,000)
     8             (Design and Contingencies - $500,000)
     9         (10)  SR 136, Signal Improvement, SR 136 at
    10             T-30 Eastbound Ramp, City of
    11             Greensburg                                    330,000
    12             (Base Project Allocation - $100,000)
    13             (Land Allocation - $50,000)
    14             (Design and Contingencies - $180,000)
    15         (11)  SR 51, Intersection Improvements, SR
    16             51 and Darr Road Intersection,
    17             Rostraver Township                            258,000
    18             (Base Project Allocation - $156,000)
    19             (Land Allocation - $36,000)
    20             (Design and Contingencies - $66,000)
    21         (12)  SR 1045, Relocation, SR 1045
    22             Relocation Phase 2, Unity Township            460,000
    23             (Base Project Allocation - $460,000)
    24         (13)  SR 70, I-70, Smithton Bridge to
    25             Smithton Interchange, Rostraver and
    26             South Huntingdon Townships                    100,000
    27             (Design and Contingencies - $100,000)
    28         (14)  US 30, PERFORM ROADWAY NOISE STUDY,                  <--
    29             CONDUCT PUBLIC MEETING, DESIGN AND
    30             INSTALL 1,865 FEET OF SOUND WALL IN A
    20060H2468B4279                 - 86 -     

     1             DEMONSTRATION PROJECT ALONG TODD SCHOOL
     2             ROAD, TAKE EIGHT STRIPS OF PRIVATE
     3             PROPERTY AND ONE HOUSE, RELOCATE SMALL
     4             PORTION OF ROADWAY, HEMPFIELD TOWNSHIP      2,500,000
     5             (BASE PROJECT ALLOCATION - $1,880,000)
     6             (LAND ALLOCATION - $210,000)
     7             (DESIGN AND CONTINGENCIES - $410,000)
     8  Section 366.  Wyoming County (Reserved).
     9  Section 367.  York County.
    10     Projects are as follows:
    11         (1)  SR 177, Provide Left Turn Lanes at the
    12             Intersection of Industrial Drive and
    13             Yorktown Road, Fairview Township            1,000,000
    14             (Base Project Allocation - $1,000,000)
    15         (2)  SR 3070 and SR 94, Intersection
    16             Relocation, Roadway Realignments and
    17             Traffic Signal, Intersection of SR
    18             3070, Black Rock Road with SR 94,
    19             Baltimore Street and Baer Avenue, Penn
    20             Township                                    1,016,000
    21             (Base Project Allocation - $640,000)
    22             (Land Allocation - $200,000)
    23             (Design and Contingencies - $176,000)
    24         (3)  Concord Road, Road Extension, Concord
    25             Road, Springettsbury Township                 125,000
    26             (Base Project Allocation - $125,000)
    27         (4)  Intermodal Facility, Design and
    28             Construct Access to Intermodal Facility
    29             Track, Five New Lines and Switches,
    30             Three New Bridges                             400,000
    20060H2468B4279                 - 87 -     

     1             (Base Project Allocation - $400,000)
     2  Section 368.  Statewide projects.
     3     Projects are as follows:
     4         (1)  Crawford, Forest, Venango and Warren
     5             Counties, Construction and Monitoring
     6             of Wetlands, Countywide Wetland
     7             Banking, Various Municipalities               130,000
     8             (Base Project Allocation - $60,000)
     9             (Land Allocation - $30,000)
    10             (Design and Contingencies - $40,000)
    11         (2)  Interstate Line Item, Central Office,
    12             Statewide                                   3,700,000
    13             (Base Project Allocation - $3,700,000)
    14         (3)  Capitalization of Infrastructure Bank,
    15             Pennsylvania Infrastructure Bank,
    16             Statewide                                  60,000,000
    17             (Base Project Allocation - $60,000,000)
    18                             CHAPTER 5
    19                             (RESERVED)
    20                             CHAPTER 7
    21                      MISCELLANEOUS PROVISIONS
    22  Section 701.  Federal funds.
    23     All moneys received from the Federal Government for the
    24  construction of the projects specifically itemized in this act
    25  are also hereby appropriated for those projects.
    26  Section 702.  Allocation of funds.
    27     Whenever as determined by the Department of Transportation
    28  that the full estimated financial costs of the projects itemized
    29  in this act are not necessary for the proper design, acquisition
    30  or construction of such projects, the excess funds no longer
    20060H2468B4279                 - 88 -     

     1  required may be allocated by the Department of Transportation to
     2  increase the estimated costs of any one or more of the projects
     3  specifically itemized in a capital budget.
     4  Section 703.  Estimated useful life.
     5     The General Assembly states that the estimated useful life of
     6  the highway capital projects itemized in this act is 30 years.
     7  Section 704.  Effective date.
     8     This act shall take effect immediately.















    B13L86BIL/20060H2468B4279       - 89 -