AN ACT
1 Providing for the highway capital budget project itemization for
2 the fiscal year 2005-2006.
3 The General Assembly of the Commonwealth of Pennsylvania
4 hereby enacts as follows:
5 CHAPTER 1
6 GENERAL PROVISIONS
7 Section 101. Short title.
8 This act shall be known and may be cited as the Highway
9 Capital Budget Project Itemization Act of 2005-2006.
10 Section 102. Total authorization.
11 The total authorization for the capital projects itemized in
12 Chapter 3 and to be constructed by the Department of
13 Transportation, its successors or assigns and to be financed
14 from current revenues of the Motor License Fund shall be
15 $1,504,287,000 $1,662,136,000 $1,713,261,000. <--
16 Section 103. Itemization of public highway projects.
1 Additional capital projects in the category of public highway 2 projects to be constructed by the Department of Transportation, 3 its successors or assigns and to be financed from current 4 revenues of the Motor License Fund are itemized in Chapter 3, 5 together with their respective estimated financial costs. 6 CHAPTER 3 7 ITEMIZED PROJECTS 8 Total 9 Project 10 Project Allocation 11 Section 301. Adams County. 12 Projects are as follows: 13 (1) SR 94 and SR 1019, Realignment of SR 14 94 and SR 1029, Berlin Road 15 Intersection, Hamilton Township 4,200,000 16 (Base Project Allocation - $3,000,000) 17 (Land Allocation - $600,000) 18 (Design and Contingencies - $600,000) 19 (2) SR 234, Widening, Safety Improvements 20 and Signalization along SR 234 to SR 21 3001 and SR 3001 to North Oxford Road, 22 Tyrone and Huntington Townships 3,200,000 23 (Base Project Allocation - $1,750,000) 24 (Land Allocation - $1,200,000) 25 (Design and Contingencies - $250,000) 26 (3) US 15, Construction of Interchange at 27 US 15 and Hunterstown Road, Strabane 28 Township 13,200,000 29 (Base Project Allocation - $10,100,000) 30 (Design and Contingencies - $3,100,000) 20060H2468B4279 - 2 -
1 Section 302. Allegheny County. 2 Projects are as follows: 3 (1) SR 8, Highway Restoration, SR 8 4 Segment 410 to Segment 461, Richland 5 Township 540,000 6 (Base Project Allocation - $540,000) 7 (2) SR 8, Widening and Adding Turning 8 Lanes to SR 8 at Ewalt Road 1,550,000 9 (Base Project Allocation - $1,448,000) 10 (Land Allocation - $6,000) 11 (Design and Contingencies - $96,000) 12 (3) SR 19, Highway Restoration, SR 19 13 Segment 60 to Segment 91, Bethel Park 14 Borough, Mount Lebanon and Upper St. 15 Clair Townships 320,000 16 (Base Project Allocation - $320,000) 17 (4) SR 19, Widening and Resurfacing 2.25 18 Miles 9,800,000 19 (Base Project Allocation - $9,800,000) 20 (5) SR 22, Highway Restoration, SR 22 21 Segment 170 to Segment 221, Collier and 22 Robinson Townships 400,000 23 (Base Project Allocation - $400,000) 24 (6) SR 22/286, Cloverleaf Intersection 10,000,000 25 (Base Project Allocation - $10,000,000) 26 (7) SR 28, I-76 to Butler County Line, 27 Roadway, Bridge, Interchange 28 Improvements and Interchange 29 Construction 31,700,000 30 (Base Project Allocation - $22,500,000) 20060H2468B4279 - 3 -
1 (Land Allocation - $2,600,000) 2 (Design and Contingencies - $6,600,000) 3 (8) SR 48, Highway Restoration, SR 48 4 Segment 350 to Segment 401, Monroeville 5 Borough 324,000 6 (Base Project Allocation - $324,000) 7 (9) SR 48, Widening SR 48 in Monroeville 8 and North Versailles to Four Lanes from 9 SR 130 to SR 30 15,000,000 10 (Base Project Allocation - $15,000,000) 11 (10) SR 50, Highway Restoration, SR 50 12 Segment 140 to Segment 212, Collier and 13 Scott Townships, Carnegie and 14 Heidelberg Boroughs 510,000 15 (Base Project Allocation - $510,000) 16 (11) SR 60, Highway Restoration, SR 60 17 Segment 240 to Segment 283 Parkway 18 West, Moon, North Fayette and Robinson 19 Townships 470,000 20 (Base Project Allocation - $460,000) 21 (Design and Contingencies - $10,000) 22 (12) SR 60, Capacity Improvements in Moon 23 Township 14,000,000 24 (Base Project Allocation - $10,000,000) 25 (Design and Contingencies - $4,000,000) 26 (13) SR 286, Construction Phase Funding 30,000,000 27 (Base Project Allocation - $30,000,000) 28 (14) SR 837, Highway Restoration, SR 837 29 Segment 170 to Segment 210, City of 30 Clairton, West Mifflin and Dravosburg 20060H2468B4279 - 4 -
1 Boroughs 368,000 2 (Base Project Allocation - $368,000) 3 (15) SR 910, Highway Restoration, SR 910 4 Segment 390 to Segment 444, Harmar and 5 Indiana Townships 370,000 6 (Base Project Allocation - $370,000) 7 (16) SR 910 and SR 8, Widening, Realigning 8 and Adding Turn Lanes to Intersection 1,950,000 9 (Base Project Allocation - $1,950,000) 10 (17) SR 910 at SR 4031, Widening and 11 Aligning Intersection, Adding Left Turn 12 Lanes, Installing Traffic Signal 2,240,000 13 (Base Project Allocation - $1,194,000) 14 (Land Allocation - $917,000) 15 (Design and Contingencies - $129,000) 16 (18) SR 910 at SR 4063, Widening and 17 Aligning Intersection, Adding Left Turn 18 Lanes, Installing Traffic Signal 3,369,000 19 (Base Project Allocation - $1,812,000) 20 (Land Allocation - $1,391,000) 21 (Design and Contingencies - $166,000) 22 (19) SR 910 at SR 4052, Widening SR 910 to 23 Provide Eastbound and Westbound Left 24 Turn Lanes, Widening SR 4052 to Provide 25 Northbound and Southbound Left Turn 26 Lanes 2,043,000 27 (Base Project Allocation - $1,517,000) 28 (Land Allocation - $158,000) 29 (Design and Contingencies - $368,000) 30 (20) SR 910 at Cole Road, Installation of 20060H2468B4279 - 5 -
1 Traffic Signal at Intersection 126,000 2 (Base Project Allocation - $112,108) 3 (Design and Contingencies - $13,892) 4 (21) SR 2028, Highway Restoration, SR 2028 5 Segment 80 to Segment 90, City of 6 Clairton, St. Claire Avenue 80,000 7 (Base Project Allocation - $80,000) 8 (22) SR 2037, Highway Restoration, 9 2037/Pt. Perry-Electric Tri-Boro 10 Expressway, North Versailles Township 11 and East Pittsburgh Borough 1,099,000 12 (Base Project Allocation - $1,089,000) 13 (Design and Contingencies - $10,000) 14 (23) SR 3048, Prestley Street Connector 15 Project, Connecting West Main Street to 16 Lane Road, Collier Township 2,001,000 17 (Base Project Allocation - $1,477,000) 18 (Land Allocation - $80,000) 19 (Design and Contingencies - $444,000) 20 (24) SR 3160, Highway Restoration, SR 3160 21 Segment 10 to Segment 61, Moon 22 Township 636,000 23 (Base Project Allocation - $636,000) 24 (25) SR 4003, Highway Restoration, SR 4003 25 Segment 10 and Segment 11, McKnight 26 Road, City of Pittsburgh 304,000 27 (Base Project Allocation - $304,000) 28 (26) SR 4011 at SR 49, Make Intersection 29 Into Four-Way Stop, Add Traffic Signal 30 and Lower Intersection by Six Feet 1,100,000 20060H2468B4279 - 6 -
1 (Base Project Allocation - $930,000) 2 (Land Allocation - $60,000) 3 (Design and Contingencies - $110,000) 4 (27) SR 4054 at SR 19, Widen SR 4054 5 Approach to Provide Left/Left-Through 6 Right Turn Lanes at SR 19 517,000 7 (Base Project Allocation - $446,000) 8 (Design and Contingencies - $71,000) 9 (28) SR 4068 and SR 4031, Reconstruct 10 Intersection, Realign Roadway, Improve 11 Drainage and Install Traffic Signal 459,000 12 (Base Project Allocation - $313,000) 13 (Land Allocation - $115,000) 14 (Design and Contingencies - $31,000) 15 (29) Northern Pike, Widen Northern Pike in 16 Monroeville to Four Lanes from Pitcairn 17 Road to SR 48 2,000,000 18 (Base Project Allocation - $2,000,000) 19 (30) North Shore Transportation 20 Connection, Road Improvements, HOV 21 Modification, City of Pittsburgh 375,000 22 (Base Project Allocation - $375,000) 23 (31) I-79, Road Construction, I-79 to Mon- 24 Fayette Section of Southern Beltway, 25 City of Pittsburgh 300,000 26 (Base Project Allocation - $300,000) 27 (32) US 22, Road Construction, US 22 to I- 28 79 Section of Southern Beltway, City of 29 Pittsburgh 75,000 30 (Base Project Allocation - $75,000) 20060H2468B4279 - 7 -
1 (33) US 22, Road Construction, US 22 to I- 2 79 Section of Southern Beltway, City of 3 Pittsburgh 300,000 4 (Base Project Allocation - $300,000) 5 (34) SR 19, Highway Restoration, from 6 Washington County Line to McLauglin 7 Road, 0010/0000-0060/0000 479,000 8 (Base Project Allocation - $479,000) 9 (35) SR 48, Highway Restoration, from SR 10 148 to SR 2031, 0170/0000-0220/0000 888,000 11 (Base Project Allocation - $888,000) 12 (36) SR 60, Interstate Maintenance, ITS 13 Expansion SR 60, Robinson Town Center 14 to Business 60 345,000 15 (Base Project Allocation - $300,000) 16 (Design and Contingencies - $45,000) 17 (37) SR 60, Interstate Maintenance, 18 Parkway West to I-79, 0150/0000- 19 0240/0000 1,100,000 20 (Base Project Allocation - $1,100,000) 21 (38) SR 60, Interstate Maintenance, SR 60 22 Part 6 and 7 Interstate, Various 23 Townships 3,300,000 24 (Base Project Allocation - $3,000,000) 25 (Design and Contingencies - $300,000) 26 (39) SR 60, Interstate Maintenance, SR 60 27 Part 2, CPR, Moon Township 2,200,000 28 (Base Project Allocation - $2,000,000) 29 (Design and Contingencies - $200,000) 30 (40) SR 60, Interstate Maintenance, Part 1 20060H2468B4279 - 8 -
1 Interstate, Moon, North Fayette and 2 Robinson Townships 500,000 3 (Design and Contingencies - $500,000) 4 (41) SR 60, Roadway, Safety and Access 5 Improvements, Improve McClaren Road 6 Interchange and Other Associated SRs, 7 Findlay Township 5,000,000 8 (Base Project Allocation - $5,000,000) 9 (42) I-79, Interstate Painting I-79 800,000 10 (Base Project Allocation - $800,000) 11 (43) SR 28, Road Resurfacing with Bridge 12 Preservation A45, SR 28 93,000 13 (Base Project Allocation - $81,000) 14 (Design and Contingencies - $12,000) 15 (44) SR 28, Road Resurfacing with Bridge 16 Preservation, SR 28 220,000 17 (Base Project Allocation - $192,000) 18 (Design and Contingencies - $28,000) 19 (45) SR 51, Highway Restoration, SR 51 20 Signal Enhancement, Edgebrook to 21 Englert 102,000 22 (Base Project Allocation - $100,000) 23 (Design and Contingencies - $2,000) 24 (46) SR 51, Highway Restoration, SR 51 25 North Signal Enhancements, Coraopolis 142,000 26 (Base Project Allocation - $140,000) 27 (Design and Contingencies - $2,000) 28 (47) SR 51, Highway Restoration, West End 29 Bridge to McKees Rocks, 0460/0000- 30 0490/0000 1,000,000 20060H2468B4279 - 9 -
1 (Base Project Allocation - $1,000,000) 2 (48) SR 65, Interstate Preservation and 3 Restoration 07-08, SR 65 at NI Ramps, 4 Various Townships 617,000 5 (Base Project Allocation - $536,000) 6 (Design and Contingencies - $81,000) 7 (49) SR 65, Interstate Restoration and 8 Preservation 07-08, SR 65 at NI Ramps, 9 Various Townships 617,000 10 (Base Project Allocation - $536,000) 11 (Design and Contingencies - $81,000) 12 (50) SR 79, Bridge and Highway 13 Restoration, Interstate 07-08, Neville 14 Top, Aleppo and Robinson Townships, 15 Glenfield Borough 800,000 16 (Base Project Allocation - $800,000) 17 (51) SR 79, Preventive Maintenance and 18 Bridge Replacement, I- 19 79/Neville/Killbuck-I-279, Various 20 Townships 5,500,000 21 (Base Project Allocation - $5,500,000) 22 (52) SR 79, Interstate Maintenance, I- 23 79/35M Preparatory Work, Various 24 Townships 1,060,000 25 (Base Project Allocation - $1,060,000) 26 (53) SR 79, Bridge Preservation - 7, 27 Interstate Preservation 2007-2008, 28 Aleppo Township, Glenfield Borough 800,000 29 (Base Project Allocation - $800,000) 30 (54) SR 79, Interstate Maintenance, ITS 20060H2468B4279 - 10 -
1 Expansion I-79, I-297 to I-76 118,000 2 (Design and Contingencies - $118,000) 3 (55) SR 79, Interstate Maintenance, Mill 4 and Overlay, I-79 Part 4 Interstate, 5 Kennedy and Robinson Townships 1,250,000 6 (Base Project Allocation - $1,200,000) 7 (Design and Contingencies - $50,000) 8 (56) SR 79, Interstate Maintenance, Mill 9 and Overlay, I-79 Part 4 Interstate, 10 Kennedy and Robinson Townships 1,250,000 11 (Base Project Allocation - $1,200,000) 12 (Design and Contingencies - $50,000) 13 (57) SR 130, Highway Restoration, 14 Allegheny River Boulevard Signal 15 Enhancement, Penn Hills Township 102,000 16 (Base Project Allocation - $100,000) 17 (Design and Contingencies - $2,000) 18 (58) SR 279, Interstate Maintenance CPR, 19 I-279 Part 5, 6 and 7 CPR, Pittsburgh, 20 Various Townships 4,400,000 21 (Base Project Allocation - $4,000,000) 22 (Design and Contingencies - $400,000) 23 (59) SR 279, Interstate Maintenance CPR, 24 I-279 Part 5, 6 and 7 CPR, Various 25 Townships 4,400,000 26 (Base Project Allocation - $4,000,000) 27 (Design and Contingencies - $400,000) 28 (60) SR 279, Interstate Maintenance, ITS 29 Expansion I-279, Camp Horne to I-79 96,000 30 (Design and Contingencies - $96,000) 20060H2468B4279 - 11 -
1 (61) SR 279, Interstate Maintenance, ETS 2 Expansion I-279/PA 65, North Shore 3 Expressway 483,000 4 (Base Project Allocation - $420,000) 5 (Design and Contingencies - $63,000) 6 (62) SR 279, Interstate Maintenance, Fort 7 Duquesne Bridge and Ramps, City of 8 Pittsburgh 982,000 9 (Base Project Allocation - $854,000) 10 (Design and Contingencies - $128,000) 11 (63) SR 366, Highway Restoration, from 12 Bull Creek Road to the Tarentum Bridge, 13 0012/0000-0032/0400, Tarentum Borough 234,000 14 (Base Project Allocation - $234,000) 15 (64) SR 376, Rehabilitation Includes 16 Concrete Wall and Ceiling Repairs, 17 Facade Repairs, Fan and Fanhouse 18 Repair, Replacement of Lighting and 19 Electrical Systems, City of Pittsburgh 4,400,000 20 (Base Project Allocation - $4,000,000) 21 (Design and Contingencies - $400,000) 22 (65) SR 376, Bridge Preservation and 23 Highway Restoration and Signing 24 Interstates 07-08, City of Pittsburgh 4,066,000 25 (Base Project Allocation - $3,256,000) 26 (Design and Contingencies - $810,000) 27 (66) SR 376, Bridge Preservation and 28 Highway Restoration, 07-08, City of 29 Pittsburgh 3,222,000 30 (Base Project Allocation - $2,844,000) 20060H2468B4279 - 12 -
1 (Design and Contingencies - $378,000) 2 (67) SR 376, Interstate Maintenance, Mill 3 and Overlay, I-376, Part 4 and 5, 4 Churchill and Monroeville Boroughs, 5 Penn Hills and Wilkins Townships 5,500,000 6 (Base Project Allocation - $5,000,000) 7 (Design and Contingencies - $500,000) 8 (68) SR 376, Interstate Maintenance, I-376 9 Parkway Electrical, City of Pittsburgh, 10 Various Boroughs 900,000 11 (Base Project Allocation - $800,000) 12 (Design and Contingencies - $100,000) 13 (69) SR 376, Interstate Maintenance, I-376 14 Parkway Walls, Various Townships 500,000 15 (Design and Contingencies - $500,000) 16 (70) SR 376, Interstate Maintenance, 17 Electrical, I-376 Parkway, Various 18 Townships 900,000 19 (Base Project Allocation - $800,000) 20 (Design and Contingencies - $100,000) 21 (71) SR 376, Interstate Maintenance, Mill 22 and Overlay, I-376, Part 4 and 5, 23 Various Townships 5,500,000 24 (Base Project Allocation - $5,000,000) 25 (Design and Contingencies - $500,000) 26 (72) SR 376, Highway Restoration, Squirrel 27 Hill Tunnel Rehabilitation, City of 28 Pittsburgh 4,400,000 29 (Base Project Allocation - $4,000,000) 30 (Design and Contingencies - $400,000) 20060H2468B4279 - 13 -
1 (73) SR 376, Bridge and Highway 2 Restoration, 07-08, I-376-2 Phase 2 3 Interstate and Phase I Signing, City of 4 Pittsburgh 7,238,000 5 (Base Project Allocation - $6,437,000) 6 (Design and Contingencies - $801,000) 7 (74) SR 376, Bridge and Highway 8 Restoration, 07-08, I-376-3 Phase 3, 9 Interstate, Various Townships 3,229,000 10 (Base Project Allocation - $2,851,000) 11 (Design and Contingencies - $378,000) 12 (75) SR 376, Interstate Maintenance, 13 Parkway Walls, I-376, City of 14 Pittsburgh, Various Municipalities 500,000 15 (Design and Contingencies - $500,000) 16 (76) SR 376, Interstate Maintenance, ITS 17 Expansion I-376, Penn Hills to I-76 660,000 18 (Base Project Allocation - $660,000) 19 (77) SR 376, Highway Restoration, 20 Beechwood Boulevard Ramp to I-376 East, 21 Squirrel Hill, City of Pittsburgh 52,000 22 (Base Project Allocation - $40,000) 23 (Design and Contingencies - $12,000) 24 (78) SR 400, Highway Restoration, from 25 Penn Circle to Near Entrance to 26 Shopping Center, 0090/0080-0090/1225 315,000 27 (Base Project Allocation - $315,000) 28 (79) SR 400, Highway Restoration, from 29 Concrete Section to SR 8, 0090/1225- 30 0120/0000 165,000 20060H2468B4279 - 14 -
1 (Base Project Allocation - $165,000) 2 (80) SR 579, Interstate Maintenance, 3 Roadway Bridge Patch and Overlay, I-579 4 Part 1, Veteran's Bridge/Town, City of 5 Pittsburgh 4,310,000 6 (Base Project Allocation - $4,000,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $290,000) 9 (81) SR 579, Interstate Maintenance, 10 Roadway Bridge Patch and Overlay, I-579 11 Part 1, Veteran's Bridge/Town, City of 12 Pittsburgh 4,310,000 13 (Base Project Allocation - $4,000,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $290,000) 16 (82) SR 885, Highway Restoration, from SR 17 885 to Ravensburg Road, 0010/0000- 18 0030/0000 168,000 19 (Base Project Allocation - $168,000) 20 (83) SR 2048, Highway Restoration, from 21 Bridge over Thompson Run to SR 48, 22 0050/1252-0110/0000 735,000 23 (Base Project Allocation - $735,000) 24 (84) SR 3069, Highway Restoration, SR 3069 25 Improvement 200,000 26 (Base Project Allocation - $200,000) 27 (85) SR 6279, Bridge and Highway 28 Restoration, Interstates 07-08, City of 29 Pittsburgh 1,337,000 30 (Base Project Allocation - $1,160,000) 20060H2468B4279 - 15 -
1 (Design and Contingencies - $177,000) 2 (86) SR 6279, Bridge and Highway 3 Restoration, Interstates 07-08, HOV 4 Section, Patch and Grind, City of 5 Pittsburgh 1,359,000 6 (Base Project Allocation - $1,182,000) 7 (Design and Contingencies - $177,000) 8 (87) Various, Highway Restoration and Full 9 Bridge Painting, Allegheny River 10 Crossing, 40th Street Bridge, City of 11 Pittsburgh 4,460,000 12 (Base Project Allocation - $4,000,000) 13 (Land Allocation - $60,000) 14 (Design and Contingencies - $400,000) 15 (88) Various, Bridge and Highway 16 Restoration, Interstates 07-08, Bridge 17 Preventative Maintenance/46 Dam 18 Replacement, Various Townships 452,000 19 (Base Project Allocation - $420,000) 20 (Design and Contingencies - $32,000) 21 (89) Various, Bridge Preventative 22 Maintenance/46 Dam Replacement 242,000 23 (Base Project Allocation - $210,000) 24 (Design and Contingencies - $32,000) 25 (90) SR 28, BRIDGE PRESERVATION, O'HARA, <-- 26 SPRINGDALE, FRAZIER, EASTER AND DEER 27 TOWNSHIPS 895,000 28 (BASE PROJECT ALLOCATION - $895,000) 29 (91) I-79, INTERSTATE MAINTENANCE I-79 AT <-- 30 SR 51, ROBINSON TOWNSHIP 200,000 20060H2468B4279 - 16 -
1 (BASE PROJECT ALLOCATION - $200,000) 2 (92) I-579, INTERSTATE RESTORATION FROM 3 THE BOULEVARD OF THE ALLIES TO VETERANS 4 BRIDGE 960,000 5 (BASE PROJECT ALLOCATION - $960,000) 6 (93) I-376, PENNSYLVANIA TURNPIKE AT 7 MONROEVILLE AND ALONG I-376, I-279, 8 REDESIGNATION SIGNAGE, SR 22 AND SR 60 9 END AT BEAVER COUNTY LINE 4,420,000 10 (BASE PROJECT ALLOCATION - $2,820,000) 11 (LAND ALLOCATION - $1,600,000) 12 Section 303. Armstrong County. 13 Projects are as follows: 14 (1) SR 28/66, Highway Reconstruction, 15 Goheenville Dip, Boggs and Wayne 16 Townships 1,000,000 17 (Base Project Allocation - $600,000) 18 (Land Allocation - $300,000) 19 (Design and Contingencies - $100,000) 20 (2) SR 28, Kittanning to Jefferson County 21 Line, Roadway, Bridge, Interchange 22 Improvements and Interchange 23 Construction 35,050,000 24 (Base Project Allocation - $26,250,000) 25 (Land Allocation - $2,100,000) 26 (Design and Contingencies - $6,700,000) 27 (3) SR 28/128, Park and Ride Construction, 28 Slatelick Park-n-Ride, Bell and 29 Henderson Townships 110,000 30 (Base Project Allocation - $80,000) 20060H2468B4279 - 17 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $10,000) 3 (4) SR 28, Highway Reconstruction, PA 28 4 Avenue Gap PM 1,400,000 5 (Base Project Allocation - $1,000,000) 6 (Land Allocation - $200,000) 7 (Design and Contingencies - $200,000) 8 (5) SR 268, Park and Ride Expansion, PA 9 268 West Kittanning Park-n-Ride, West 10 Kittanning Borough 86,000 11 (Base Project Allocation - $60,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $6,000) 14 (6) SR 268, Intersection Safety 15 Improvements, PA 268 and SR 1038 16 Intersection, West Kittanning Borough 242,000 17 (Base Project Allocation - $200,000) 18 (Land Allocation - $7,000) 19 (Design and Contingencies - $35,000) 20 (7) SR 356, Highway Reconstruction, 21 Freeport Bridge Ramps, Freeport 22 Borough 1,220,000 23 (Base Project Allocation - $1,000,000) 24 (Land Allocation - $80,000) 25 (Design and Contingencies - $140,000) 26 (8) SR 1003, Slide Repair, South Mahoning 27 Slide, Pine Township 260,000 28 (Base Project Allocation - $260,000) 29 (9) Rail Siding, Rail Siding Construction, 30 Freeport Terminals, Freeport Borough 1,054,000 20060H2468B4279 - 18 -
1 (Base Project Allocation - $906,000) 2 (Land Allocation - $64,000) 3 (Design and Contingencies - $84,000) 4 Section 304. Beaver County. 5 Projects are as follows: 6 (1) SR 18, Highway Restoration, SR 18, 7 Wallace Run Road, SR 351, Big Beaver 8 Boulevard, Homewood and Koppel 500,000 9 (Base Project Allocation - $500,000) 10 (2) SR 51, Highway Reconstruction, SR 51, 11 Franklin Avenue Bridge/Ambridge 12 Aliquippa 2, City of Aliquippa and 13 Hopewell Township 1,810,000 14 (Base Project Allocation - $1,800,000) 15 (Design and Contingencies - $10,000) 16 (3) SR 151, Highway Restoration, SR 151, 17 Brodhead Road Route 51, Hopewell 18 Township, South Heights Borough 400,000 19 (Base Project Allocation - $400,000) 20 (4) SR 151, Highway Restoration, SR 151 21 Segment 10 to Segment 50, Greene, 22 Independence, Hanover and Raccoon 23 Townships 700,000 24 (Base Project Allocation - $700,000) 25 (5) SR 288, Highway Restoration, SR 288 26 Segment 100 to Segment 120, Franklin 27 Township 310,000 28 (Base Project Allocation - $310,000) 29 (6) SR 288, Highway Restoration, SR 288 30 Segment 130 to Segment 150, Franklin 20060H2468B4279 - 19 -
1 Township 310,000 2 (Base Project Allocation - $310,000) 3 (7) SR 588, Highway Restoration, SR 588, 4 Eastvale Borough, Mercer Bennett Run, 5 North Sewickley Township 320,000 6 (Base Project Allocation - $320,000) 7 (8) SR 3017, Highway Restoration, SR 8 3017/SR 60, Brodhead Road, Center 9 Township 830,000 10 (Base Project Allocation - $800,000) 11 (Design and Contingencies - $30,000) 12 (9) SR 4028, Highway Restoration, SR 13 4028/SR 68, Third Street, Beaver 14 Borough and Vanport Township 315,000 15 (Base Project Allocation - $310,000) 16 (Design and Contingencies - $5,000) 17 (10) SR 4035, Highway Restoration, SR 4035 18 Segment 20 to Segment 50, Brighton 19 Township 310,000 20 (Base Project Allocation - $310,000) 21 (11) SR 4051, Highway Restoration, SR 22 4051, Buffalo - Gypsy Glen, Beaver 23 Borough 320,000 24 (Base Project Allocation - $310,000) 25 (Design and Contingencies - $10,000) 26 (12) SR 18, Highway Restoration, Squirrel 27 Run Road to Route 60, 0300/0000- 28 0390/0000 800,000 29 (Base Project Allocation - $800,000) 30 (13) SR 51, Interstate Maintenance, SR 51 20060H2468B4279 - 20 -
1 and Franklin AmAliquippa2, North Shore 2 Expressway 1,800,000 3 (Base Project Allocation - $1,800,000) 4 (14) SR 989, Highway Restoration, 0010 to 5 0060 272,000 6 (Base Project Allocation - $272,000) 7 (15) SR 989, Highway Restoration, from SR 8 65 to Solar Drive, 0010/0000-0060/0000 270,000 9 (Base Project Allocation - $270,000) 10 (16) SR-60, SIGNAGE FOR REDESIGNATION FROM <-- 11 ALLEGHENY COUNTY TO LAWER 5,210,000 12 (BASE PROJECT ALLOCATION - $4,510,000) 13 (LAND ALLOCATION - $700,000) 14 Section 305. Bedford County. 15 Projects are as follows: 16 (1) SR 4009, Safety Improvement, Sunnyside 17 Road Signal Improvement, Bedford 18 Borough 155,000 19 (Base Project Allocation - $125,000) 20 (Land Allocation - $2,000) 21 (Design and Contingencies - $28,000) 22 (2) SR 4009, Safety Improvement, Sunnyside 23 Road Signal Improvement, Bedford 24 Borough 155,000 25 (Base Project Allocation - $125,000) 26 (Land Allocation - $2,000) 27 (Design and Contingencies - $28,000) 28 Section 306. Berks County. 29 Projects are as follows: 30 (1) SR 10, Widening, New Morgan Borough 20060H2468B4279 - 21 -
1 and Caernarvon Township 12,500,000 2 (Base Project Allocation - $10,000,000) 3 (Design and Contingencies - $2,500,000) 4 (2) SR 73, Radius Flattening/Safety, SR 5 73/1010, Maiden Creek Township 300,000 6 (Base Project Allocation - $70,000) 7 (Land Allocation - $200,000) 8 (Design and Contingencies - $30,000) 9 (3) SR 78, I-78 Restoration, Strausstown 10 to SR 61 1,225,000 11 (Base Project Allocation - $1,125,000) 12 (Design and Contingencies - $100,000) 13 (4) SR 183, Intersection Improvement, SR 14 183/4016 Jefferson Township 2,100,000 15 (Base Project Allocation - $1,400,000) 16 (Land Allocation - $200,000) 17 (Design and Contingencies - $500,000) 18 (5) SR 183, Intersection Improvements, 19 Signalization at SR 4016, New 20 Schaefferstown Road 10,500,000 21 (Base Project Allocation - $7,000,000) 22 (Land Allocation - $1,000,000) 23 (Design and Contingencies - $2,500,000) 24 (6) SR 183, PA 183 Widening, Bern 25 Township, US 222 to Airport 400,000 26 (Base Project Allocation - $400,000) 27 (7) SR 183, Highway Widening Between SR 28 222 and SR 3051, Upper Van Reed Road 3,500,000 29 (Base Project Allocation - $2,000,000) 30 (Land Allocation - $1,000,000) 20060H2468B4279 - 22 -
1 (Design and Contingencies - $500,000) 2 (8) SR 183, Intersection Improvements at 3 SR 4018 1,000,000 4 (Base Project Allocation - $700,000) 5 (Land Allocation - $100,000) 6 (Design and Contingencies - $200,000) 7 (9) SR 222, US 222 North Corridor EIS, 8 Ontelaunee Township to Kutztown 9,000,000 9 (Design and Contingencies - $9,000,000) 10 (10) SR 422, West Shore Bypass, Highway 11 Rehabilitation 3,150,000 12 (Base Project Allocation - $2,000,000) 13 (Land Allocation - $400,000) 14 (Design and Contingencies - $750,000) 15 (11) SR 724, Guiderail/Safety 16 Improvements, Berks Guiderail Upgrade, 17 Various Municipalities 110,000 18 (Base Project Allocation - $100,000) 19 (Design and Contingencies - $10,000) 20 (12) SR 2005, Congestion Reduction, Route 21 222 Business CCIP, City of Reading and 22 Muhlenberg Township 525,000 23 (Base Project Allocation - $400,000) 24 (Design and Contingencies - $125,000) 25 (13) SR 2005, Intersection Improvements, 26 Signalization at SR 1010, Park Road, 27 and Relocation of SR 222 Ramp 2,000,000 28 (Base Project Allocation - $1,600,000) 29 (Land Allocation - $100,000) 30 (Design and Contingencies - $300,000) 20060H2468B4279 - 23 -
1 (14) I-76, Improvements in New Morgan 2 Borough 25,000,000 3 (Base Project Allocation - $21,250,000) 4 (Design and Contingencies - $3,750,000) 5 (15) SR 78, Berks Bridge Under Clearance, 6 Bethel, Upper Bern, Upper Tulpehocken 7 Townships 100,000 8 (Design and Contingencies - $100,000) 9 (16) SR 222, Safety Improvements and 10 Congestion Reduction, 222 North 11 Corridor, City of Reading 5,950,000 12 (Base Project Allocation - $4,000,000) 13 (Land Allocation - $250,000) 14 (Design and Contingencies - $1,700,000) 15 (17) SR 222, Corridor Safety Improvements 16 and Traffic Calming, Muhlenberg 17 Township 222, Muhlenberg Township 0 <-- 18 TOWNSHIP 222, MUHLENBERG TOWNSHIP 250,000 <-- 19 (BASE PROJECT ALLOCATION - $250,000) 20 (18) SR 422, Signal Coordination and 21 Congestion Reduction, 422 Corridor 22 Phase 3, Exeter Township 150,000 23 (Base Project Allocation - $150,000) 24 (19) Rail Crossing Signalization Upgrade, 25 Hill Road Railroad Crossing, Blandon 26 Township 18,000 27 (Base Project Allocation - $18,000) 28 (20) Rail Crossing Signalization Upgrade, 29 Main Street Railroad Crossing, Lyons 30 Borough 18,000 20060H2468B4279 - 24 -
1 (Base Project Allocation - $18,000) 2 (21) Rail Crossing Signalization Upgrade, 3 East Wesner Railroad Upgrade, 4 Maidencreek Township 18,000 5 (Base Project Allocation - $18,000) 6 (22) Replace At-Grade Railroad Crossing 7 with a Bridge, Krick Lane Bridge, South 8 Heidelberg Township 168,000 9 (Base Project Allocation - $60,000) 10 (Land Allocation - $18,000) 11 (Design and Contingencies - $90,000) 12 (23) Improved Connection to SR 183, River 13 Road Extension, City of Reading 500,000 14 (Base Project Allocation - $500,000) 15 (24) Rail Crossing Signalization Upgrade, 16 Willow Street Railroad Upgrade, 17 Fleetwood Borough 65,000 18 (Base Project Allocation - $65,000) 19 (25) SR 422, PREVENTATIVE MAINTENANCE AND <-- 20 PAVEMENT RESTORATION, WEST SHORE BYPASS 21 HIGHWAY, CUMRU TOWNSHIP, CITY OF 22 READING AND WEST READING BOROUGH 2,920,000 23 (BASE PROJECT ALLOCATION - $1,560,000) 24 (LAND ALLOCATION - $160,000) 25 (DESIGN AND CONTINGENCIES - $1,200,000) 26 (26) INTERSECTION OF OLEY TURNPIKE ROAD 27 AND RITTERS ROAD, EXETER TOWNSHIP, 28 REALIGNMENT, IMPROVEMENT AND 29 SIGNALIZATION 4,500,000 30 (BASE PROJECT ALLOCATION - $4,500,000) 20060H2468B4279 - 25 -
1 (27) SR 562, INTERSECTION WITH RITTERS
2 ROAD, EXETER TOWNSHIP, ROAD IMPROVEMENT
3 AND SIGNALIZATION 4,500,000
4 (BASE PROJECT ALLOCATION - $4,500,000)
5 Section 307. Blair County.
6 Projects are as follows:
7 (1) SR 99, Concrete Rehabilitation,
8 Greenfield Township 100,000
9 (Base Project Allocation - $100,000)
10 (2) SR 99, Gabion Wall Repair, I-99,
11 Allegheny Township 50,000
12 (Base Project Allocation - $50,000)
13 Section 308. Bradford County (Reserved). <--
14 SECTION 308. BRADFORD COUNTY. <--
15 PROJECTS ARE AS FOLLOWS:
16 (1) SR 220, SAYRE-ATHENS BYPASS BETTERMENT
17 PROJECT 6,100,000
18 (BASE PROJECT ALLOCATION - $6,100,000)
19 Section 309. Bucks County.
20 Projects are as follows:
21 (1) SR 263, Widening, Channelization,
22 Signalization and Lighting, PA 263,
23 County Line to Bristol, Warminster
24 Township 670,000
25 (Base Project Allocation - $670,000)
26 (2) SR 3003, Widening, Safety Improvements
27 and Signalization along SR 3003, Lower
28 State Road and Wells Road 600,000
29 (Base Project Allocation - $510,000)
30 (Land Allocation - $60,000)
20060H2468B4279 - 26 -
1 (Design and Contingencies - $30,000) 2 (3) US 13, Reconstruction, Redevelopment 3 and Beautification, US 13 Corridor 1,250,000 4 (Base Project Allocation - $1,250,000) 5 (4) US 202, Section 700, Parkway Project, 6 County Line/Parkway Overpass and 7 Interchange 20,000,000 8 (Base Project Allocation - $18,000,000) 9 (Design and Contingencies - $2,000,000) 10 (5) US 202, Section 700 Parkway Project, 11 Limekiln Pike/Parkway Overpass and 12 Interchange 20,000,000 13 (Base Project Allocation - $18,000,000) 14 (Design and Contingencies - $2,000,000) 15 (6) Protzner Road, Design and 16 Construction, Protzner Road Connector 800,000 17 (Base Project Allocation - $800,000) 18 (7) Swamp Road, Safety and Roadway 19 Improvements, Swamp Road Corridor 600,000 20 (Base Project Allocation - $600,000) 21 Section 310. Butler County. 22 Projects are as follows: 23 (1) SR 528, Park and Ride Expansion, 24 Jackson Township 110,000 25 (Base Project Allocation - $84,000) 26 (Land Allocation - $20,000) 27 (Design and Contingencies - $6,000) 28 (2) SR 3018, Highway Construction, Rowan 29 Road, Cranberry Township 920,000 30 (Base Project Allocation - $800,000) 20060H2468B4279 - 27 -
1 (Land Allocation - $80,000) 2 (Design and Contingencies - $40,000) 3 (3) SR 3021, Highway Restoration, Franklin 4 Road, Cranberry Township 720,000 5 (Base Project Allocation - $600,000) 6 (Land Allocation - $80,000) 7 (Design and Contingencies - $40,000) 8 (4) SR 3022, Highway Reconstruction, 9 Rochester Road, Cranberry Township 885,000 10 (Base Project Allocation - $650,000) 11 (Land Allocation - $200,000) 12 (Design and Contingencies - $35,000) 13 (5) SR 3022, Highway Construction, 14 Rochester Road, Cranberry Township 885,000 15 (Base Project Allocation - $650,000) 16 (Land Allocation - $200,000) 17 (Design and Contingencies - $35,000) 18 (6) US 19, Northwest Connector Project, 19 Complete the Connection from Powell 20 Road that Begins at Freedom Road to 21 Freshcorn Road to SR 19 2,800,000 22 (Base Project Allocation - $2,380,000) 23 (Design and Contingencies - $420,000) 24 (7) SR 19, Traffic Study, US 19, Corridor 25 Study 1,670,000 26 (Base Project Allocation - $1,000,000) 27 (Land Allocation - $400,000) 28 (Design and Contingencies - $270,000) 29 (8) SR 28/356, Park and Ride Expansion, PA 30 28/356, Buffalo Township 86,000 20060H2468B4279 - 28 -
1 (Base Project Allocation - $60,000) 2 (Land Allocation - $20,000) 3 (Design and Contingencies - $6,000) 4 (9) SR 68, Safety Improvement, O'Donnel 5 Curve 490,000 6 (Base Project Allocation - $400,000) 7 (Land Allocation - $30,000) 8 (Design and Contingencies - $60,000) 9 (10) I-79/US 422, Park and Ride 10 Construction, I-79/US 422 Park-n-Ride, 11 Muddycreek Township 66,000 12 (Base Project Allocation - $40,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $6,000) 15 (11) Traffic Study, Butler City Traffic 16 Study Results, Butler City 1,670,000 17 (Base Project Allocation - $1,000,000) 18 (Land Allocation - $400,000) 19 (Design and Contingencies - $270,000) 20 (12) SR 528, PARK AND RIDE EXPANSION, <-- 21 JACKSON TOWNSHIP 96,000 22 (BASE PROJECT ALLOCATION - $70,000) 23 (LAND ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $6,000) 25 Section 311. Cambria County. 26 Projects are as follows: 27 (1) SR 271, Safety Improvement, Flatten 28 Curve, Phoebe Court Curves, City of 29 Johnstown 155,000 30 (Base Project Allocation - $125,000) 20060H2468B4279 - 29 -
1 (Land Allocation - $2,000) 2 (Design and Contingencies - $28,000) 3 (2) SR 22 FROM SR 22 AND 219 INTERCHANGE, <-- 4 EBENSBURG, TO SR 4031 (WEST HIGH 5 STREET) AND SR 22 INTERCHANGE, CAMBRIA 6 TOWNSHIP 168,000 7 (BASE PROJECT ALLOCATION - $140,000) 8 (DESIGN AND CONTINGENCIES - $28,000) 9 (3) SR 22 INTERSECTION WITH SR 3032 10 (MINIMAL ROAD), CAMBRIA TOWNSHIP, 11 ADDITIONAL TURN LANES AND INCREASED 12 LENGTH OF EXISTING TURN LANES 2,850,000 13 (BASE PROJECT ALLOCATION - $1,750,000) 14 (LAND ALLOCATION - $100,000) 15 (DESIGN AND CONTINGENCIES - $1,000,000) 16 (4) INTERSECTION OF SR 22 AND PENNDOT 17 DRIVE AND WALMART PLAZA, CAMBRIA 18 TOWNSHIP, ADDITIONAL TURN LANES 2,000,000 19 (BASE PROJECT ALLOCATION - $1,500,000) 20 (LAND ALLOCATION - $100,000) 21 (DESIGN AND CONTINGENCIES - $400,000) 22 (5) SR 22, CAMBRIA TOWNSHIP, FROM GIANT 23 EAGLE PLAZA TO THE WALMART PLAZA, 24 CONSTRUCT A NEW SERVICE ROAD AND 25 INSTALL BARRIER 5,250,000 26 (BASE PROJECT ALLOCATION - $3,250,000) 27 (LAND ALLOCATION - $500,000) 28 (DESIGN AND CONTINGENCIES - $1,500,000) 29 (6) JAMESWAY ROAD TWO-WAY ACCESS NEAR THE 30 WALMART PLAZA, CAMBRIA TOWNSHIP, 20060H2468B4279 - 30 -
1 INTERSECTION REALIGNMENT 3,150,000 2 (BASE PROJECT ALLOCATION - $1,650,000) 3 (LAND ALLOCATION - $1,000,000) 4 (DESIGN AND CONTINGENCIES - $500,000) 5 Section 312. Cameron County. 6 Projects are as follows: 7 (1) SR 120, Safety Improvement, Additional 8 Turn Lane, Emporium Borough 700,000 9 (Base Project Allocation - $500,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $150,000) 12 Section 313. Carbon County. 13 Projects are as follows: 14 (1) SR 80, I-80 White Haven Bridge Repair, 15 East Side Borough, Kidder Township 850,000 16 (Base Project Allocation - $770,000) 17 (Design and Contingencies - $80,000) 18 Section 314. Centre County. 19 Projects are as follows: 20 (1) SR 99, ITS Installation, I-99, Port 21 Matilda to I-80 2,600,000 22 (Base Project Allocation - $2,600,000) 23 (2) SR 26, Restoration and Rehabilitation, 24 Pleasant Gap Borough 525,000 25 (Base Project Allocation - $400,000) 26 (Land Allocation - $50,000) 27 (Design and Contingencies - $75,000) 28 (3) SR 26, Restoration and Rehabilitation, 29 Beaver Avenue Betterment, State College 30 Borough and College Townships 400,000 20060H2468B4279 - 31 -
1 (Base Project Allocation - $300,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $50,000) 4 (4) SR 26, Safety Improvement, SR 26 and 5 SR 3011 Sign Installation, College 6 Township 700,000 7 (Base Project Allocation - $500,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $150,000) 10 (5) SR 26, Safety Improvement, Additional 11 Turn Lane, Ferguson Township 700,000 12 (Base Project Allocation - $500,000) 13 (Land Allocation - $50,000) 14 (Design and Contingencies - $150,000) 15 (6) SR 45, Safety Improvement, SR 45 and 16 SR 3014 Intersection, Harris Township 700,000 17 (Base Project Allocation - $500,000) 18 (Land Allocation - $50,000) 19 (Design and Contingencies - $150,000) 20 (7) SR 150, Congestion Reduction, US 150 21 Corridor, Bellefonte Borough and Spring 22 Township 1,050,000 23 (Base Project Allocation - $1,000,000) 24 (Design and Contingencies - $50,000) 25 (8) SR 322, Rehabilitation and 26 Resurfacing, US 322, Resurfacing, 27 Potter Township 590,000 28 (Base Project Allocation - $440,000) 29 (Land Allocation - $50,000) 30 (Design and Contingencies - $100,000) 20060H2468B4279 - 32 -
1 (9) SR 504, Rehabilitation and Additional 2 Turn Lane, Wingate Turn Lane, Union and 3 Boggs Townships 460,000 4 (Base Project Allocation - $300,000) 5 (Land Allocation - $100,000) 6 (Design and Contingencies - $60,000) 7 (10) SR 3014, Safety Improvement, SR 3014 8 and SR 3018, Intersection Improvements, 9 State College Borough 700,000 10 (Base Project Allocation - $500,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $150,000) 13 (11) SR 3014, Safety Improvement, Traffic 14 Management, Patton and Ferguson 15 Townships, State College Borough 700,000 16 (Base Project Allocation - $500,000) 17 (Land Allocation - $50,000) 18 (Design and Contingencies - $150,000) 19 (12) Safety Improvement, University Park 20 Area, State College Borough 0 <-- 21 AREA, STATE COLLEGE BOROUGH 250,000 <-- 22 (BASE PROJECT ALLOCATION - $250,000) 23 Section 315. Chester County. 24 Projects are as follows: 25 (1) SR 29, Additional Right and Left 26 Turning Lanes, PA 29 Phase III, East 27 Whiteland and Charlestown Townships 2,950,000 28 (Base Project Allocation - $1,900,000) 29 (Land Allocation - $400,000) 30 (Design and Contingencies - $650,000) 20060H2468B4279 - 33 -
1 (2) SR 202, Roadway and Bridge 2 Reconstruction, US 202, Exton Bypass - 3 Route 29, East Whiteland Township 14,200,000 4 (Base Project Allocation - $14,200,000) 5 (3) SR 1002, Improve Hazardous and 6 Congested Intersection by Eliminating 7 Offset and Adding Left Turn Lanes, 8 Swedesford at Valley Road, Tredyffrin 9 Township 160,000 10 (Base Project Allocation - $160,000) 11 (4) SR 1055, Construct Two-Lane or Three- 12 Lane Highway on New Alignment, Eagle 13 Loop Road, South Link, Upper Uwchlan 14 Township 1,020,000 15 (Base Project Allocation - $1,020,000) 16 (5) SR 2020/SR 3053, Extension of SR 2020, 17 Boot Road, to SR 3053, Viaduct Avenue, 18 Borough of Downingtown 4,600,000 19 (Base Project Allocation - $3,700,000) 20 (Design and Contingencies - $900,000) 21 (6) US 30, Reconstruction, Including 22 Travel Lanes and Shoulders, From PA 10 23 to US 30 Business 1,000,000 24 (Base Project Allocation - $1,000,000) 25 (7) US 202, Section 100 of US 202, 26 Additional Lane in Each Direction, 27 Construct Grade Separation 28 Interchanges 180,000,000 29 (Base Project Allocation - 30 $180,000,000) 20060H2468B4279 - 34 -
1 (8) US 202, Paving Corridor from Delaware 2 Border to High Street, West Chester 800,000 3 (Base Project Allocation - $800,000) 4 (9) PA 100, Provide Four Through Lanes on 5 PA 100 by Constructing Two Through 6 Lanes to the East of Ludwigs Corner 1,000,000 7 (Base Project Allocation - $1,000,000) 8 (10) French Creek Parkway, Design and 9 Construct the French Creek Parkway and 10 Connector Roads, Phoenixville 1,250,000 11 (Base Project Allocation - $1,250,000) 12 (11) PA-100, CORRIDOR IMPROVEMENTS, <-- 13 SECURITY WALL ALONG THE WEST SIDE OF 14 ROUTE 100 SPUR BETWEEN KIRKLAND ROAD 15 AND GREENHILL ROAD, WEST GOSHEN 16 TOWNSHIP 2,500,000 17 (BASE PROJECT ALLOCATION - $2,500,000) 18 (12) SR-52, ROUNDABOUT CONSTRUCTION, ROUTE 19 52 650,000 20 (BASE PROJECT ALLOCATION - $650,000) 21 Section 316. Clarion County. 22 Projects are as follows: 23 (1) SR 368, Intersection Improvement, PA 24 368/T-310 Intersection, Licking 25 Township 785,000 26 (Base Project Allocation - $580,000) 27 (Land Allocation - $85,000) 28 (Design and Contingencies - $120,000) 29 (2) SR 68, Safety Improvement, Reidsburg 30 Bridge Curve, Piney Township 490,000 20060H2468B4279 - 35 -
1 (Base Project Allocation - $400,000) 2 (Land Allocation - $30,000) 3 (Design and Contingencies - $60,000) 4 (3) SR 80, I-80 Mill and Fill Preventative 5 Maintenance, Clarion, Limestone and 6 Monroe Townships 814,000 7 (Base Project Allocation - $814,000) 8 (4) SR 208/338, Safety Improvement, PA 208 9 and PA 338 Intersection, Beaver and 10 Knox Townships 193,000 11 (Base Project Allocation - $150,000) 12 (Land Allocation - $8,000) 13 (Design and Contingencies - $35,000) 14 (5) SR 322/66, Safety Improvement, US 322 15 and PA 66 Intersection, Paint Township 198,000 16 (Base Project Allocation - $150,000) 17 (Land Allocation - $13,000) 18 (Design and Contingencies - $35,000) 19 (6) I-80, Preventive Maintenance, Clarion, 20 I-80 Mill and Fill Preventive 21 Maintenance 815,000 22 (Base Project Allocation - $785,000) 23 (Design and Contingencies - $30,000) 24 Section 317. Clearfield County. 25 Projects are as follows: 26 (1) SR 80, Runoff Study, I-80, Dubois 27 Area, Sandy Township 172,000 28 (Base Project Allocation - $100,000) 29 (Land Allocation - $2,000) 30 (Design and Contingencies - $70,000) 20060H2468B4279 - 36 -
1 (2) SR 80, I-80 PM Project 4, Interstate 2 Maintenance Program, Lawrence, Pine, 3 Sandy, Union and Washington Townships 2,565,000 4 (Base Project Allocation - $2,315,000) 5 (Land Allocation - $250,000) 6 (3) SR 153, Safety Improvement, T-384 7 Intersection, Woodward Township 130,000 8 (Base Project Allocation - $100,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $20,000) 11 (4) SR 53, Additional Turn Lane at Ninth 12 Street Intersection, Phillipsburg 250,000 13 (Base Project Allocation - $100,000) 14 (Design and Contingencies - $150,000) 15 (5) SR 219, Safety Improvement, SR 3011 16 Intersection, Irishtown Road, Bloom 17 Township 235,000 18 (Base Project Allocation - $160,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $65,000) 21 (6) SR 219, Additional Lane, Intersection 22 Improvements, Sandy Township 900,000 23 (Base Project Allocation - $900,000) 24 (7) SR 219, Restoration and 25 Rehabilitation, Luthersburg to Anderson 26 Creek, Brady and Bloom Townships 662,000 27 (Base Project Allocation - $600,000) 28 (Land Allocation - $2,000) 29 (Design and Contingencies - $60,000) 30 (8) SR 219, SAMI, Intersection 20060H2468B4279 - 37 -
1 Improvements, Bell Township 672,000 2 (Base Project Allocation - $600,000) 3 (Land Allocation - $2,000) 4 (Design and Contingencies - $70,000) 5 (9) SR 219, SAMI, Liberty Boulevard, City 6 of Dubois 260,000 7 (Base Project Allocation - $200,000) 8 (Land Allocation - $40,000) 9 (Design and Contingencies - $20,000) 10 (10) SR 219, Restoration and 11 Rehabilitation, Brady Street Turning 12 Lane, City of Dubois 552,000 13 (Base Project Allocation - $250,000) 14 (Design and Contingencies - $302,000) 15 (11) SR 219, Safety Improvement, Regional 16 Traffic Study, City of Dubois, Sandy 17 Township 340,000 18 (Base Project Allocation - $200,000) 19 (Land Allocation - $40,000) 20 (Design and Contingencies - $100,000) 21 (12) SR 219, Restoration, Rehabilitation 22 and Bridge Preservation, McGees Mills 23 to Burnside 545,000 24 (Base Project Allocation - $400,000) 25 (Land Allocation - $20,000) 26 (Design and Contingencies - $125,000) 27 (13) SR 219, Highway Restoration, Woodland 28 to Shawville, Betterment, Bradford and 29 Goshen Townships 662,000 30 (Base Project Allocation - $600,000) 20060H2468B4279 - 38 -
1 (Land Allocation - $2,000) 2 (Design and Contingencies - $60,000) 3 (14) SR 219, Restoration and 4 Rehabilitation, DuBois Four Lane 5 (State), Sandy Township 1,525,000 6 (Base Project Allocation - $1,500,000) 7 (Land Allocation - $25,000) 8 (15) SR 219, Safety and Signal 9 Improvements, City of DuBois 700,000 10 (Base Project Allocation - $500,000) 11 (Land Allocation - $150,000) 12 (Design and Contingencies - $50,000) 13 (16) SR 219, Safety, Alignment and Signal 14 Improvements, Brady Township 700,000 15 (Base Project Allocation - $500,000) 16 (Land Allocation - $150,000) 17 (Design and Contingencies - $50,000) 18 (17) SR 255, Safety Improvement, Tyler 19 Intersection, Huston Township 90,000 20 (Base Project Allocation - $70,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $10,000) 23 (18) SR 255, Safety Improvement, Road 24 Resurfacing, Huston Township 280,000 25 (Base Project Allocation - $180,000) 26 (Land Allocation - $20,000) 27 (Design and Contingencies - $80,000) 28 (19) SR 322, Restoration and 29 Rehabilitation, Rockton Mountain, Union 30 Township 294,000 20060H2468B4279 - 39 -
1 (Base Project Allocation - $294,000) 2 (20) SR 322, Safety and Signal 3 Improvement, Lawrence Township 700,000 4 (Base Project Allocation - $500,000) 5 (Land Allocation - $50,000) 6 (Design and Contingencies - $150,000) 7 (21) SR 453, Restoration and 8 Rehabilitation, Anderson Creek Bridge 9 Betterment, Curwensville Borough 174,000 10 (Base Project Allocation - $120,000) 11 (Design and Contingencies - $54,000) 12 (22) SR 970, Restoration and 13 Rehabilitation, Woodland to Shawville, 14 Bradford and Goshen Townships 662,000 15 (Base Project Allocation - $600,000) 16 (Land Allocation - $2,000) 17 (Design and Contingencies - $60,000) 18 (23) SR 4017/SR 255, Safety Improvement, 19 Lane Addition, Sandy Township 640,000 20 (Base Project Allocation - $500,000) 21 (Land Allocation - $100,000) 22 (Design and Contingencies - $40,000) 23 (24) SR 80, Restoration and 24 Rehabilitation, Jefferson County Line 25 to Exit 120, Sandy and Union Townships 2,220,000 26 (Base Project Allocation - $2,140,000) 27 (Land Allocation - $80,000) 28 (25) SR 80, Milling, Resurfacing, Guide 29 Rail and Drainage, I-80 PM Project 4, 30 Various Townships 2,565,000 20060H2468B4279 - 40 -
1 (Base Project Allocation - $2,315,000) 2 (Design and Contingencies - $250,000) 3 (26) SR 1001, Restoration and 4 Rehabilitation, SR 1001 Old Town Road, 5 Lawrence Township 450,000 6 (Base Project Allocation - $150,000) 7 (Land Allocation - $100,000) 8 (Design and Contingencies - $200,000) 9 (27) SR 4017, Additional Turn Lane, SR 10 4017 Right Turn Lane, Sandy Township 315,000 11 (Base Project Allocation - $140,000) 12 (Land Allocation - $75,000) 13 (Design and Contingencies - $100,000) 14 (28) Railroad, Railroad Safety 15 Improvements, Clearfield Cluster 16 Project, Clearfield and Clinton 17 Counties 0 <-- 18 COUNTIES 250,000 <-- 19 (BASE PROJECT ALLOCATION - $250,000) 20 (29) SR 53, Restoration and Rehabilitation 21 and Bridge Preservation, McGees Mills 22 to Burnside, Bell and Burnside 23 Townships 545,000 24 (Base Project Allocation - $400,000) 25 (Land Allocation - $20,000) 26 (Design and Contingencies - $125,000) 27 Section 318. Clinton County. 28 Projects are as follows: 29 (1) SR 150, Restoration and 30 Rehabilitation, Fishing Creek to Bald 20060H2468B4279 - 41 -
1 Eagle, Bald Eagle Township 965,000 2 (Base Project Allocation - $650,000) 3 (Land Allocation - $200,000) 4 (Design and Contingencies - $115,000) 5 (2) SR 150, Safety Improvement, 6 Intersection Improvements, City of Lock 7 Haven 700,000 8 (Base Project Allocation - $500,000) 9 (Land Allocation - $50,000) 10 (Design and Contingencies - $150,000) 11 (3) SR 220, Safety Improvement, 12 Intersection Improvements, Lamar 13 Township 700,000 14 (Base Project Allocation - $500,000) 15 (Land Allocation - $50,000) 16 (Design and Contingencies - $150,000) 17 Section 319. Columbia County. 18 Projects are as follows: 19 (1) SR 42 and SR 4009, Intersection 20 Improvements, Intersection of SR 42 and 21 SR 4009, Mount Pleasant Township 1,300,000 22 (Base Project Allocation - $1,000,000) 23 (Land Allocation - $100,000) 24 (Design and Contingencies - $200,000) 25 (2) SR 80, Safety Improvement, Low Head 26 Dam Removal, Mount Pleasant and Scott 27 Townships 70,000 28 (Base Project Allocation - $50,000) 29 (Design and Contingencies - $20,000) 30 (3) Various, Wetlands Monitoring Analysis, 20060H2468B4279 - 42 -
1 Various Locations 100,000 2 (Base Project Allocation - $100,000) 3 (4) SR 80, Bridge Deck Patching, 4 Mifflinville Susquehanna Bridge, 5 Mifflin and South Centre Townships 1,000,000 6 (Base Project Allocation - $1,000,000) 7 (5) SR 80, HIGHWAY RECONSTRUCTION FROM <-- 8 BUCKHORN TO THE MONTOUR COUNTY LINE 470,000 9 (BASE PROJECT ALLOCATION - $450,000) 10 (DESIGN AND CONTINGENCIES - $20,000) 11 Section 320. Crawford County. 12 Projects are as follows: 13 (1) SR 8, Update Existing Traffic Signals, 14 PA 8/PA 27, Barber to Schwartz, Geale 15 to Second Street, City of Titusville 130,000 16 (Base Project Allocation - $50,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $60,000) 19 (2) SR 89, Realignment of S Curve, SR 89 20 Segment 60, Three Miles North of 21 Titusville, Oil Creek Township 350,000 22 (Base Project Allocation - $300,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $40,000) 25 (3) SR 79, Interstate Restoration, I-79 26 Milepost 153.3 to Milepost 165, 27 Hayfield and Cussewago Townships 1,000,000 28 (Base Project Allocation - $1,000,000) 29 (4) SR 79, IPM Interstate Restoration, 30 Milepost 153.5 to Milepost 165, I-79 20060H2468B4279 - 43 -
1 Segment 1530/1531 - 1620/1621, 2 Cussewago and Hayfield Townships 0 <-- 3 CUSSEWAGO AND HAYFIELD TOWNSHIPS 2,500,000 <-- 4 (BASE PROJECT ALLOCATION - $2,500,000) 5 (5) SR 27, Signal Upgrades, Drainage 6 Improvements, New Roadway, SR 27 and 7 North Street Connector, City of 8 Meadville 2,000,000 9 (Base Project Allocation - $1,000,000) 10 (Land Allocation - $800,000) 11 (Design and Contingencies - $200,000) 12 (6) SR 20, Turning Radii, Surface 13 Improvements, Drainage and Realign, SR 14 198 Realignments, SR 77, 86 and 198, 15 Blooming Valley Borough and Woodcock 16 Township 660,000 17 (Base Project Allocation - $600,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $40,000) 20 (7) SR 6, Install Signals, Drainage, 21 Surface Improvements and Pavement 22 Markings, SR 6, Saegertown 23 Improvements, Saegertown Borough, 24 Woodcock and Hayfield Townships 1,060,000 25 (Base Project Allocation - $800,000) 26 (Land Allocation - $160,000) 27 (Design and Contingencies - $100,000) 28 Section 321. Cumberland County. 29 Projects are as follows: 30 (1) SR 1006, Construction of an Underpass 20060H2468B4279 - 44 -
1 on SR 1006 at Stella Street Rail 2 Crossing 8,237,000 <-- 3 CROSSING 8,787,000 <-- 4 (Base Project Allocation - $6,887,000) 5 (LAND ALLOCATION - $550,000) <-- 6 (Design and Contingencies - $1,350,000) 7 (2) SR 81, I-81 PM Resurfacing, Carlisle 8 Borough 250,000 9 (Base Project Allocation - $100,000) 10 (Design and Contingencies - $150,000) 11 Section 322. Dauphin County. 12 Projects are as follows: 13 (1) SR 230, Lower Swatara Township, 14 Improvements to University Drive, 15 Beginning at SR 230 and Terminating at 16 the Airport Connector Road 29,000,000 17 (Base Project Allocation - $23,000,000) 18 (Design and Contingencies - $6,000,000) 19 (2) Third Street, Road Extension, Third 20 Street from I-83 to Chestnut Street, 21 City of Harrisburg 1,080,000 22 (Base Project Allocation - $1,080,000) 23 (3) SR 2029, I-81 Bridge Preventative 24 Maintenance, Lower Paxton, East Hanover 25 and West Hanover Townships 852,000 26 (Base Project Allocation - $852,000) 27 (4) SR 83, Widen and Interchange 28 Improvement, I-83 East Shore Section 1, 29 Swatara, Lower Paxton and Susquehanna 30 Townships 940,000 20060H2468B4279 - 45 -
1 (Design and Contingencies - $940,000) 2 (5) SR 83 AND 2ND STREET, CONSTRUCTION OF <-- 3 THE SOUTHERN GATEWAY PROJECT, CITY OF 4 HARRISBURG 20,000,000 5 (BASE PROJECT ALLOCATION - $15,000,000) 6 (LAND ALLOCATION - $2,000,000) 7 (DESIGN AND CONTINGENCIES - $3,000,000) 8 Section 323. Delaware County. 9 Projects are as follows: 10 (1) SR 95, Construct New On/Off Ramps from 11 US 322 at Commodore Barry Bridge to PA 12 291, Second Street, I-95/322, 13 Waterfront Access, Chester City 35,000 14 (Base Project Allocation - $35,000) 15 (2) SR 322, Conchester Road, US 322, 16 Corridor Improvements to Conchester 17 Road, Widening to Four Lanes, 18 Construction of Jughandles and 19 Installation of Median Barriers 117,500,000 20 (Base Project Allocation - $90,000,000) 21 (Land Allocation - $14,500,000) 22 (Design and Contingencies - 23 $13,000,000) 24 (3) SR 491 at Section M00, Corridor 25 Improvement, Naamans Creek Road 8,000,000 26 (Base Project Allocation - $8,000,000) 27 (4) SR 2016, Signalization Improvements, 28 Baltimore Avenue/Pike, Media Borough, 29 Nether Providence 1,122,000 30 (Base Project Allocation - $1,122,000) 20060H2468B4279 - 46 -
1 (5) SR 3029, SR 3031, SR 3007, SR 0261, 2 Intersection Improvements in Bethel 3 Township at Five-Point Intersection of 4 Valley Brook Road (SR 3029), Chelsea 5 Road, (SR 3031), Concord Road (SR 3007) 6 and Foulk Road (SR 0261) 700,000 7 (Design and Contingencies - $700,000) 8 (6) SR 3023, SR 3029, SR 3046, Llewellyn 9 Road Realignment in Chester Heights 10 Borough 1,200,000 11 (Base Project Allocation - $904,000) 12 (Land Allocation - $200,000) 13 (Design and Contingencies - $96,000) 14 (7) US 1 and SR 452, Middletown Township, 15 Construction of Loop Road and 16 Improvements to US 1 and SR 452 12,000,000 17 (Base Project Allocation - $10,000,000) 18 (Design and Contingencies - $2,000,000) 19 (8) I-95 and SR 322, Interchange and Area 20 Improvements, Improvement Movement to 21 Northbound I-95 and Create New Movement 22 for Southbound I-95 700,000 23 (Design and Contingencies - $700,000) 24 Section 324. Elk County. 25 Projects are as follows: 26 (1) SR 219, Intersection Improvements, SR 27 219 Intersection with SR 2003, Horton 28 Township 195,000 29 (Base Project Allocation - $120,000) 30 (Land Allocation - $75,000) 20060H2468B4279 - 47 -
1 (2) SR 321, Restoration and 2 Rehabilitation, Wilcox to Kane, Jones 3 and Wetmore Townships, Kane Borough 1,175,000 4 (Base Project Allocation - $1,100,000) 5 (Land Allocation - $75,000) 6 (3) SR 219, Safety Improvement, ITS, 7 Ridgway Borough and Ridgway Township 700,000 8 (Base Project Allocation - $500,000) 9 (Land Allocation - $150,000) 10 (Design and Contingencies - $50,000) 11 (4) SR 255, Restoration and 12 Rehabilitation, Million Dollar Highway, 13 City of St. Marys 2,640,000 14 (Base Project Allocation - $2,400,000) 15 (Land Allocation - $60,000) 16 (Design and Contingencies - $180,000) 17 Section 325. Erie County. 18 Projects are as follows: 19 (1) SR 5, Highway Restoration, Widening to 20 Add Lane, 12th Street, Peninsula Drive 21 to Asbury Road, City of Erie 1,800,000 22 (Base Project Allocation - $1,600,000) 23 (Land Allocation - $100,000) 24 (Design and Contingencies - $100,000) 25 (2) SR 426, Update Existing Traffic 26 Signals, North Center Street, South 27 Street to Bond Street, City of Corry 130,000 28 (Base Project Allocation - $50,000) 29 (Land Allocation - $20,000) 30 (Design and Contingencies - $60,000) 20060H2468B4279 - 48 -
1 (3) Sassafras Street-Erie County 2 Convention Center, Construction of a 3 New Access Road, Intersection 4 Improvements and Protected Railroad 5 Crossing from the Bayfront Parkway to 6 Presque Isle Bay, New Erie Convention 7 Center on the Sassafras Pier, City of 8 Erie 2,500,000 9 (Base Project Allocation - $2,500,000) 10 (4) SR 6, Widen Lanes, Shoulders and 11 Construct Turning Lanes, Erie Rural- 12 Urban Corridor, US 6, Various 13 Municipalities 840,000 14 (Base Project Allocation - $750,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $80,000) 17 (5) SR 20, Signal Optimization, 18 Enhancements, and Minor Geometric 19 Improvements, SR 20, 26th Street to 20 French Street CCIP, 26th Street and 21 Buffalo Road from Hudson and Geist 22 Street to French Street, City of Erie 110,000 23 (Base Project Allocation - $65,000) 24 (Land Allocation - $5,000) 25 (Design and Contingencies - $40,000) 26 Section 326. Fayette County. 27 Projects are as follows: 28 (1) SR 21, Widen SR 21 and SR 166 29 Intersection to 48 Feet, German 30 Township 4,480,000 20060H2468B4279 - 49 -
1 (Base Project Allocation - $3,360,000) 2 (Land Allocation - $700,000) 3 (Design and Contingencies - $420,000) 4 (2) SR 21, Widen SR 21 and S&T Drive 5 Intersection to 48 Feet, German 6 Township 4,520,000 7 (Base Project Allocation - $3,440,000) 8 (Land Allocation - $600,000) 9 (Design and Contingencies - $480,000) 10 (3) SR 21, Widen S&T Drive to Thompson 11 Crossing to 48 Feet, German, Menallen 12 and South Union Townships 3,976,000 13 (Base Project Allocation - $2,300,000) 14 (Land Allocation - $1,416,000) 15 (Design and Contingencies - $260,000) 16 (4) SR 21, Widen S&T Drive to Thompson 17 Crossing to 48 feet, German, Menallen 18 and South Union Townships 4,815,000 19 (Base Project Allocation - $2,668,000) 20 (Land Allocation - $1,827,000) 21 (Design and Contingencies - $320,000) 22 (5) SR 21, Widen and Upgrade SR 21, Mall 23 Entrance to SR 40, City of Uniontown 24 and South Union Township 1,663,000 25 (Base Project Allocation - $1,046,000) 26 (Land Allocation - $477,000) 27 (Design and Contingencies - $140,000) 28 (6) SR 21, Road Improvements, SR 21 400,000 29 (Base Project Allocation - $400,000) 30 (7) SR 40, Safety Improvements, SR 40, 20060H2468B4279 - 50 -
1 Menallen and Wharton Townships 3,050,000 2 (Base Project Allocation - $2,000,000) 3 (Land Allocation - $750,000) 4 (Design and Contingencies - $300,000) 5 (8) SR 40, Widen SR 40 and Redesign and 6 Construct SR 40 and SR 119 Interchange, 7 City of Uniontown, South Union and 8 North Union Townships 2,400,000 9 (Base Project Allocation - $2,000,000) 10 (Land Allocation - $100,000) 11 (Design and Contingencies - $300,000) 12 (9) SR 40, Safety Improvement, Center Turn 13 Lane, SR 40 from SR 166 to Morgan 14 Street, Redstone Township 500,000 15 (Base Project Allocation - $300,000) 16 (Land Allocation - $60,000) 17 (Design and Contingencies - $140,000) 18 (10) SR 40, Interchange Reconstruction at 19 SR 40, SR 119 and SR 3019, Morgantown 20 Road Interchange, South Union Township 2,400,000 21 (Base Project Allocation - $2,000,000) 22 (Land Allocation - $100,000) 23 (Design and Contingencies - $300,000) 24 (11) SR 119, Intersection Improvement, SR 25 119 at Technology Drive, North Union 26 Township 305,000 27 (Base Project Allocation - $200,000) 28 (Land Allocation - $30,000) 29 (Design and Contingencies - $75,000) 30 (12) SR 4020, Widening, Realignment, 20060H2468B4279 - 51 -
1 Drainage and Resurfacing, SR 4020-03R, 2 Luzerne Township 970,000 3 (Base Project Allocation - $600,000) 4 (Land Allocation - $200,000) 5 (Design and Contingencies - $170,000) 6 (13) SR 4049, New Road, Companion to Mon- 7 Fayette Expressway, SR 4049 Northgate 8 Highway 900,000 9 (Base Project Allocation - $900,000) 10 (14) SR 119, Highway Improvements, SR 119, 11 SR 711 to County Line, Bullskin and 12 Upper Tyrone Townships 1,270,000 13 (Base Project Allocation - $1,000,000) 14 (Land Allocation - $70,000) 15 (Design and Contingencies - $200,000) 16 (15) SR 40, Highway Improvements, US 40 17 Upgrades, Wharton Township 598,000 18 (Base Project Allocation - $358,000) 19 (Land Allocation - $90,000) 20 (Design and Contingencies - $150,000) 21 Section 327. Forest County. 22 Projects are as follows: 23 (1) SR 666, Widening, Base, Leveling 24 Course, Overlay, Shoulders, Drainage 25 and Guiderail, SR 666, Henry Mill Road 26 - SR 948, Hickory, Howe and Kingsley 27 Townships 250,000 28 (Base Project Allocation - $240,000) 29 (Design and Contingencies - $10,000) 30 Section 328. Franklin County. 20060H2468B4279 - 52 -
1 Projects are as follows: 2 (1) SR 2007 and SR 2012, Connect SR 2007, 3 Old Forge Road to SR 2012, Country Club 4 Road 1,419,000 5 (Base Project Allocation - $1,419,000) 6 (2) SR 3002, REALIGNMENT, WILLIAMSON ROAD, <-- 7 ANTRIM TOWNSHIP 500,000 8 (BASE PROJECT ALLOCATION - $500,000) 9 Section 329. Fulton County. 10 Projects are as follows: 11 (1) US 522, Interstate Improvements to US 12 522 from Gem to Needmore, Bellfast 13 Township 67,000,000 14 (Base Project Allocation - $67,000,000) 15 Section 330. Greene County. 16 Projects are as follows: 17 (1) SR 79, Resurfacing, Shoulder Milled 18 Rumble Strips and Raised Pavement 19 Markers, I-79, Greene, Perry and 20 Whiteley Townships 4,300,000 21 (Base Project Allocation - $4,300,000) 22 (2) SR 79, Interstate Improvements, Mile 23 Post 14 to Mile Post 21, Washington and 24 Franklin Townships 4,570,000 25 (Base Project Allocation - $2,000,000) 26 (Land Allocation - $70,000) 27 (Design and Contingencies - $2,500,000) 28 (3) SR 2026, Intersection Improvements, SR 29 2026, Franklin, Jefferson, Greene and 30 Whiteley Townships 80,000 20060H2468B4279 - 53 -
1 (Base Project Allocation - $80,000) 2 (4) SR 79, I-79 Reconstruction No.1, Perry 3 and Whiteley Townships 78,000 4 (Design and Contingencies - $78,000) 5 Section 331. Huntingdon County (Reserved). 6 Section 332. Indiana County. 7 Projects are as follows: 8 (1) SR 119, Highway Reconstruction, Wake 9 Robin Curve, Rayne Township 1,880,000 10 (Base Project Allocation - $1,200,000) 11 (Land Allocation - $400,000) 12 (Design and Contingencies - $280,000) 13 (2) SR 286, Safety Improvements, <-- 14 Philadelphia Street Signals, Indiana 15 Borough 0 16 (2) (RESERVED). <-- 17 (3) SR 422, Highway Reconstruction, 18 Indiana County 3,000,000 19 (Base Project Allocation - $2,000,000) 20 (Land Allocation - $600,000) 21 (Design and Contingencies - $400,000) 22 (4) SR 954, Safety Improvement, PA 954, <-- 23 Wayne, Church Signal, Indiana Borough 0 24 (4) (RESERVED). <-- 25 (5) SR 3043, Highway Construction, Rose 26 Street Extension Line Item, Indiana 27 Borough 870,000 28 (Base Project Allocation - $600,000) 29 (Land Allocation - $170,000) 30 (Design and Contingencies - $100,000) 20060H2468B4279 - 54 -
1 (6) SR 4032, Congested Corridor 2 Improvement, Philadelphia Street 3 Congested Corridor, Indiana Borough 350,000 4 (Base Project Allocation - $300,000) 5 (Design and Contingencies - $50,000) 6 (7) SR 422, Highway Preservation, US 422 7 Expressway/6th Street East PM, White 8 Township 840,000 9 (Base Project Allocation - $750,000) 10 (Design and Contingencies - $90,000) 11 (8) SR 22, Variable Message Signs, US 22 12 VMS 220,000 13 (Base Project Allocation - $180,000) 14 (Design and Contingencies - $40,000) 15 Section 333. Jefferson County. 16 Projects are as follows: 17 (1) SR 28, Roadway, Bridge, Interchange 18 Improvements and Interchange 19 Construction, Armstrong County Line to 20 I-80 9,190,000 21 (Base Project Allocation - $6,750,000) 22 (Land Allocation - $540,000) 23 (Design and Contingencies - $1,900,000) 24 (2) SR 119, Realignment and 25 Reconstruction, Punxsy Narrows, Bell 26 and Henderson Townships 3,120,000 27 (Base Project Allocation - $1,800,000) 28 (Land Allocation - $400,000) 29 (Design and Contingencies - $920,000) 30 (3) SR 119, Traffic Study, Punxsutawney 20060H2468B4279 - 55 -
1 Borough 50,000 2 (Design and Contingencies - $50,000) 3 (4) SR 1010, Highway Construction, Old 4 Clay Plant Road, Brockway Borough 650,000 5 (Base Project Allocation - $400,000) 6 (Land Allocation - $150,000) 7 (Design and Contingencies - $100,000) 8 (5) PA 36/436, Intersection Improvement, 9 PA 36 and 436 Intersection, 10 Punxsutawney Borough and Young 11 Township 580,000 12 (Base Project Allocation - $360,000) 13 (Land Allocation - $140,000) 14 (Design and Contingencies - $80,000) 15 Section 334. Juniata County (Reserved). 16 Section 335. Lackawanna County. 17 Projects are as follows: 18 (1) SR 6, Improve Existing Exit, Robert P. 19 Casey Highway and SR 6006, Carbondale 20 Township 640,000 21 (Base Project Allocation - $320,000) 22 (Design and Contingencies - $320,000) 23 (2) SR 11, Intersection Improvement, New 24 Signal, Birney Avenue and Rocky Glen 25 Road, Moosic Borough 200,000 26 (Base Project Allocation - $160,000) 27 (Design and Contingencies - $40,000) 28 (3) SR 3011, Intersection Improvements, 29 New Signal, Keyser Avenue and Oak 30 Street, Old Forge Borough 200,000 20060H2468B4279 - 56 -
1 (Base Project Allocation - $160,000) 2 (Design and Contingencies - $40,000) 3 (4) SR 3015, Intersection Improvement, New 4 Signal, Main Street and Third Street, 5 Moosic Borough 500,000 6 (Base Project Allocation - $460,000) 7 (Design and Contingencies - $40,000) 8 (5) SR 6006, Install Concrete Barrier, US 9 6 and US 11 and Exit 57, Scranton City, 10 Dickson City Borough 1,280,000 11 (Base Project Allocation - $800,000) 12 (Land Allocation - $80,000) 13 (Design and Contingencies - $400,000) 14 (6) SR 81, Interstate Preventative 15 Maintenance 775,000 16 (Base Project Allocation - $675,000) 17 (Design and Contingencies - $100,000) 18 (7) SR 81, Bridge Deck Replacement, I-81 19 FY 5 Bridge Rehabilitation, Various 20 Municipalities 2,000,000 21 (Base Project Allocation - $2,000,000) 22 (8) SR 81, Transportation Study, 23 Lackawanna/Luzerne, Interstate Bridge 24 PM, Scott Township 300,000 25 (Base Project Allocation - $200,000) 26 (Design and Contingencies - $100,000) 27 (9) SR 81, Transportation Study, 28 Lackawanna/Luzerne, I-2008 PM, City of 29 Scranton and South Abington Township 775,000 30 (Base Project Allocation - $675,000) 20060H2468B4279 - 57 -
1 (Design and Contingencies - $100,000) 2 Section 336. Lancaster County. 3 Projects are as follows: 4 (1) SR 441, Road Construction, Alternate 5 Truck Route for SR 441, Columbia 6 Borough 250,000 7 (Base Project Allocation - $250,000) 8 (2) US 30 and SR 230 4020, Construction of <-- 9 a Single Point Urban Interchange and 10 Related Ramp, Lane and Signalization 11 Improvements at the Intersection of US 12 30 and SR 230 4020, Harrisburg Pike, <-- 13 Manheim Township 48,580,000 14 (Base Project Allocation - $18,590,000) 15 (Design and Contingencies - 16 $29,990,000) 17 Section 337. Lawrence County. 18 Projects are as follows: 19 (1) SR 18, Highway Restoration, SR 18 and 20 SR 108, East Washington, City of New 21 Castle 433,000 22 (Base Project Allocation - $423,000) 23 (Design and Contingencies - $10,000) 24 (2) SR 19, Highway Restoration, SR 19, 25 City of Butler and SR 108, Scott and 26 Slippery Rock Townships 500,000 27 (Base Project Allocation - $500,000) 28 (3) SR 60, Construction of Access Ramps, 29 Millennium Park Access, Neshannock 30 Township 800,000 20060H2468B4279 - 58 -
1 (Base Project Allocation - $200,000) 2 (Land Allocation - $400,000) 3 (Design and Contingencies - $200,000) 4 (4) SR 60, Highway Restoration, Ben 5 Franklin Highway, SR 60 and SR 422, 6 Neshannock and Union Townships 810,000 7 (Base Project Allocation - $800,000) 8 (Design and Contingencies - $10,000) 9 (5) SR 208, Highway Restoration, SR 208, 10 Means-Volant at Pearson, Volant 11 Borough, Washington and Wilmington 12 Townships 530,000 13 (Base Project Allocation - $520,000) 14 (Design and Contingencies - $10,000) 15 (6) SR 422, Highway Restoration, SR 422, 16 Segment 10 to Segment 60, Pulaski 17 Township 630,000 18 (Base Project Allocation - $ 630,000) 19 (7) SR 422, Highway Restoration, SR 422, 20 Segment 70 to Segment 120, Mahoning and 21 Pulaski Townships 630,000 22 (Base Project Allocation - $630,000) 23 (8) PA 60, Construction of Millennium Park 24 Interchange to Provide Access to 25 Lawrence County Industrial Park, 26 Neshannock Township 210,000 27 (Base Project Allocation - $210,000) 28 (9) SR 60, Interstate Maintenance, I-376- 29 SR 60 Part 8, 9, 10 CPR, Various 30 Townships 2,700,000 20060H2468B4279 - 59 -
1 (Base Project Allocation - $2,500,000) 2 (Design and Contingencies - $200,000) 3 (10) SR 488, Highway Restoration, Tower 4 Road to County Line, 0120/0000 to 5 0180/2829 1,360,000 6 (Base Project Allocation - $1,260,000) 7 (Design and Contingencies - $100,000) 8 (11) SR 488, Highway Restoration, SR 65 to 9 Tower Road, 0010/0000-0120/0000 721,000 10 (Base Project Allocation - $721,000) 11 (12) SR 422, Highway Restoration, SR 551 12 to SR 4007, Matthews Road, 0120/0000- 13 0160/0000 357,000 14 (Base Project Allocation - $357,000) 15 (13) SR 79, Bridge Preservation and 16 Highway Reconstruction, I-79 Patch and 17 Overlay Bridge Preservation and Highway 18 Reconstruction, Plain Grove Township 2,534,000 19 (Base Project Allocation - $2,434,000) 20 (Design and Contingencies - $100,000) 21 (14) SR 488, Highway Restoration, Morrison 22 Run to County Line, 0090/0000- 23 0180/2829 535,000 24 (Base Project Allocation - $535,000) 25 (15) SR 422, Highway Restoration, New 26 Castle to Butler County Line, 27 0410/0000-0550/1176 2,400,000 28 (Base Project Allocation - $2,400,000) 29 (16) SR 60, SIGNAGE FOR REDESIGNATION FROM <-- 30 BEAVER COUNTY TO MERCER COUNTY LINE 2,810,000 20060H2468B4279 - 60 -
1 (BASE PROJECT ALLOCATION - $2,260,000) 2 (LAND ALLOCATION - $550,000) 3 Section 338. Lebanon County. 4 Projects are as follows: 5 (1) SR 72, I-78 Overhead Bridges, Union, 6 Bethel, Swatara Townships 419,000 7 (Base Project Allocation - $419,000) 8 (2) SR 4013, I-81 Overhead Bridge Group, 9 East Hanover, Union Townships 290,000 10 (Base Project Allocation - $215,000) 11 (Land Allocation - $25,000) 12 (Design and Contingencies - $50,000) 13 Section 339. Lehigh County. 14 Projects are as follows: 15 (1) SR 100, Safety Improvements and Road 16 Betterment at Shimersville Road 17 Intersection 200,000 18 (Base Project Allocation - $200,000) 19 (2) SR 100, Intersection Upgrade and 20 Signalization, Claussville and 21 Kernsville Roads 300,000 22 (Base Project Allocation - $300,000) 23 (3) SR 100/SR 309, Intersection Upgrade 24 and Signalization 300,000 25 (Base Project Allocation - $300,000) 26 (4) SR 100/SR 4003, Intersection 27 Improvement, Installment of New Traffic 28 Signals with Left Turn Lanes onto SR 29 4003, Including Drainage Improvements, 30 Guiderails, Line Painting, Widening of 20060H2468B4279 - 61 -
1 Road and New Signs, Lowhill Township 1,750,000 2 (Base Project Allocation - $1,750,000) 3 (5) SR 145, Congestion Reduction, South 4 4th Street CCIP, City of Allentown 540,000 5 (Base Project Allocation - $400,000) 6 (Land Allocation - $40,000) 7 (Design and Contingencies - $100,000) 8 (6) SR 222/SR 863, Intersection 9 Reconfiguration and Signalization at 10 Intersection of Schantz Road and SR 222 11 to Allow for Reduction of Accidents and 12 Traffic Congestion 4,000,000 13 (Base Project Allocation - $4,000,000) 14 (7) SR 309, Install Safety and Warning 15 Devices, Tilgman Street Interchange 3,000,000 16 (Base Project Allocation - $3,000,000) 17 (8) SR 1019, Select Safety Improvements, 18 Cedar Crest Boulevard 1,200,000 19 (Base Project Allocation - $1,200,000) 20 (9) SR 309, Highway Safety and Capacity 21 Improvements, Kidspeace Broadway 22 Campus 180,000 23 (Base Project Allocation - $180,000) 24 (10) SR 222, Right-of-Way Acquisition for 25 Park-n-Ride, 222 Trexlerstown II, 26 Wescoville 900,000 27 (Base Project Allocation - $500,000) 28 (Land Allocation - $400,000) 29 (11) US 22, Preconstruction Studies, US 30 22, Irving Street to Mickley Road, City 20060H2468B4279 - 62 -
1 of Allentown 200,000 2 (Base Project Allocation - $200,000) 3 (12) Upgrade Circuit for Gates and Lights, 4 31st Street, 31st Street Railroad 5 Crossing, City of Allentown 25,000 6 (Base Project Allocation - $25,000) 7 (13) Upgrade Circuit for Gates and Lights, 8 7th Street Upgrade, 7th Street Railroad 9 Crossing, City of Allentown 25,000 10 (Base Project Allocation - $25,000) 11 (14) SR 309, Widen Lanes, Add Turn Lane, 12 Upgrade Intersection, SR 309/4010 13 Intersection, North Whitehall Township 300,000 14 (Base Project Allocation - $300,000) 15 (15) I-78, Improvements in and around the 16 I-78 and PA 100 Interchange, PA 100 17 Improvements, Area I-78 Interchange and 18 Schonz Road, City of Allentown 3,750,000 19 (Base Project Allocation - $3,750,000) 20 (16) SR 1002, 22 and 378, Roadway, Safety 21 and Access Improvements, SR 1002 (Union 22 Boulevard), SR 22 and SR 378 Roadway 23 Improvements, City of Allentown 1,750,000 24 (Base Project Allocation - $1,750,000) 25 Section 340. Luzerne County. 26 Projects are as follows: 27 (1) SR 315, Signal Improvement, Laflin 28 Road to Old Boston Road, Laflin Borough 29 to Jenkins Township 1,040,000 30 (Base Project Allocation - $800,000) 20060H2468B4279 - 63 -
1 (Land Allocation - $80,000) 2 (Design and Contingencies - $160,000) 3 (2) SR 415, Intersection Improvements to 4 Address Congestion, Dallas Borough 1,920,000 5 (Base Project Allocation - $1,200,000) 6 (Land Allocation - $80,000) 7 (Design and Contingencies - $640,000) 8 (3) SR 424, Extension of SR 424, Hazleton 9 Beltway to SR 924 11,600,000 10 (Base Project Allocation - $8,800,000) 11 (Land Allocation - $800,000) 12 (Design and Contingencies - $2,000,000) 13 (4) SR 81, Preventative Maintenance, LLTS 14 Interstate Bridge, Various Townships 350,000 15 (Base Project Allocation - $200,000) 16 (Design and Contingencies - $150,000) 17 (5) SR 81, Preventative Maintenance, I-81 18 Southbound Grinding, Various Townships 440,000 19 (Base Project Allocation - $400,000) 20 (Design and Contingencies - $40,000) 21 (6) SR 81, Interstate Preventative 22 Maintenance 400,000 23 (Base Project Allocation - $400,000) 24 (7) INFRASTRUCTURE DEVELOPMENT OF ROADWAYS <-- 25 AND INTERSECTION AT OAK STREET/ROUTE 26 315/I-81/I-476 INTERCHANGE AREA, 27 PITTSTON AND JENKINS TOWNSHIPS 20,000,000 28 (BASE PROJECT ALLOCATION - $20,000,000) 29 Section 341. Lycoming County. 30 Projects are as follows: 20060H2468B4279 - 64 -
1 (1) Various, Wetlands Monitoring, Various 2 Locations 100,000 3 (Base Project Allocation - $100,000) 4 (2) SR 118, Add Turn Lane, SR 118 and SR 5 405 Intersection Improvement, 6 Hughesville Borough 160,000 7 (Base Project Allocation - $100,000) 8 (Land Allocation - $20,000) 9 (Design and Contingencies - $40,000) 10 (3) SR 220, Turn Lanes and Jughandles, 11 Pine and Quenshuneny Run Safety 12 Improvements, Piatt and Woodward 13 Townships 95,000 14 (Base Project Allocation - $65,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $20,000) 17 (4) WETLANDS MONITORING ANALYSIS 200,000 <-- 18 (BASE PROJECT ALLOCATION - $200,000) 19 Section 342. McKean County. 20 Projects are as follows: 21 (1) SR 219, Restoration and 22 Rehabilitation, Lewis Run to Custer 23 City, Lafayette and Sergeant Townships 782,000 24 (Base Project Allocation - $700,000) 25 (Land Allocation - $2,000) 26 (Design and Contingencies - $80,000) 27 (2) SR 6, Safety Improvement, Signal 28 Installation, Smethport Borough 700,000 29 (Base Project Allocation - $500,000) 30 (Land Allocation - $50,000) 20060H2468B4279 - 65 -
1 (Design and Contingencies - $150,000) 2 Section 343. Mercer County. 3 Projects are as follows: 4 (1) Various, Construct and Monitor 5 Wetlands, Countywide Wetland Banking, 6 Various Municipalities in Mercer 7 County 130,000 8 (Base Project Allocation - $60,000) 9 (Land Allocation - $30,000) 10 (Design and Contingencies - $40,000) 11 (2) East Lake Road, Road Relocation, East 12 Lake Road, Pymatuning Township 25,000 13 (Base Project Allocation - $25,000) 14 (3) SR 58, Signal Timing Optimization, 15 Traffic Signal Enhancements and Minor 16 Geometric Improvements, SR 58, SR 173 17 and SR 58 CCIP, Grove City Borough 120,000 18 (Base Project Allocation - $75,000) 19 (Land Allocation - $5,000) 20 (Design and Contingencies - $40,000) 21 Section 344. Mifflin County. 22 Projects are as follows: 23 (1) SR 22, Restoration and Rehabilitation, 24 Concrete Rehabilitation, Lewistown 25 Borough to Derry Township 500,000 26 (Base Project Allocation - $400,000) 27 (Design and Contingencies - $100,000) 28 (2) SR 1017, Intersection Improvements, 29 Radius at Logan Street, Lewistown 30 Borough 213,000 20060H2468B4279 - 66 -
1 (Base Project Allocation - $92,000) 2 (Land Allocation - $40,000) 3 (Design and Contingencies - $81,000) 4 (3) SR 22, Safety Improvement, 5 Intersection Improvements, Lewistown 6 Borough and Derry Township 700,000 7 (Base Project Allocation - $500,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $150,000) 10 (4) SR 1005, Safety Improvement, 11 Intersection Improvements, Derry 12 Township 700,000 13 (Base Project Allocation - $500,000) 14 (Land Allocation - $50,000) 15 (Design and Contingencies - $150,000) 16 Section 345. Monroe County. 17 Projects are as follows: 18 (1) SR 447, Widening and other 19 Improvements to PA 447 and Brushy 20 Mountain Road, Stroud Township 675,000 21 (Base Project Allocation - $435,000) 22 (Land Allocation - $90,000) 23 (Design and Contingencies - $150,000) 24 (2) SR 447, Widening and Installation of 25 Southbound Left Turn Lane Approaching 26 Brushy Mountain Road, Northbound Right 27 Turn Lane Approaching Brushy Mountain 28 Road, Northbound Left Turn Lane 29 Approaching the United Steel Driveway, 30 Drainage Improvements, Installation of 20060H2468B4279 - 67 -
1 a Traffic Signal and Associated Work 675,000 2 (Base Project Allocation - $575,000) 3 (Design and Contingencies - $100,000) 4 (3) SR 611, Highway Reconstruction, Ramp 5 Reconstruction, Bartonsville 6 Interchange HOP, Stroud Township 3,000,000 7 (Base Project Allocation - $3,000,000) 8 (4) SR 611, Highway Intersection 9 Improvements, 5 Point HOP, Mount Pocono 10 Borough 500,000 11 (Base Project Allocation - $500,000) 12 (5) SR 80, CCL-115 Including Interchange, 13 Tobyhanna Township 300,000 14 (Land Allocation - $100,000) 15 (Design and Contingencies - $200,000) 16 (6) SR 80, Construction, I-80 Eastbound, 17 115 to 380 4" Mill and Overlay, 18 Tobyhanna Township 773,000 19 (Base Project Allocation - $703,000) 20 (Design and Contingencies - $70,000) 21 (7) SR 80, Bridge Repairs, I-80, Pocono 22 and Smithfield Townships, Stroudsburg 23 Borough 290,000 24 (Base Project Allocation - $250,000) 25 (Design and Contingencies - $40,000) 26 (8) SR 80, Bridge Repair, Overlay, I-80 27 Eastbound, I-380 to SR 33, Jackson and 28 Pocono Townships 1,380,000 29 (Base Project Allocation - $1,080,000) 30 (Land Allocation - $100,000) 20060H2468B4279 - 68 -
1 (Design and Contingencies - $200,000) 2 (9) SR 611, Congested Corridor Improvement 3 Project, 611 CCIP Phase 2, Stroudsburg 4 Borough 260,000 5 (Base Project Allocation - $200,000) 6 (Land Allocation - $60,000) 7 (10) I-80, Upgrades and Improvements 3,750,000 8 (Base Project Allocation - $3,750,000) 9 Section 346. Montgomery County. 10 Projects are as follows: 11 (1) SR 202, Reconstruction and Widening, 12 US 202, Morris Road to PA 63, 13 Montgomery, Upper and Lower Gwynedd, 14 Upper Dublin and Whitpain Townships 32,700,000 15 (Base Project Allocation - $32,700,000) 16 (2) SR 309, Integration, Cheltenham Avenue 17 to PA 63 and the Link from PA 63 to US 18 202, Cheltenham, Springfield, Upper 19 Dublin and Whitemarsh Townships 15,000,000 20 (Base Project Allocation - $15,000,000) 21 (3) SR 3051, Widen Replacement Bridge, Old 22 Betzwood Pedestrian Trail, West 23 Norriton Township 800,000 24 (Base Project Allocation - $800,000) 25 (4) SR 4031, Replacement of Signal 26 Controller equipment, Installation of 27 Signal Preemption Equipment, Pottstown 28 Borough and North Coventry Township 2,000,000 29 (Base Project Allocation - $2,000,000) 30 (5) I-476, I-76 and PA 309, Intelligent 20060H2468B4279 - 69 -
1 Transportation System Deployment along 2 I-476 Pennsylvania Turnpike Northeast 3 Extension, PA 309 and I-76 Schuylkill 4 Expressway 800,000 5 (Base Project Allocation - $800,000) 6 (6) SR 1058, Road Construction, SR 1058 7 Connector Between PA 309 and 8 Pennsylvania Turnpike Northeast 9 Extension 320,000 10 (Base Project Allocation - $320,000) 11 (7) Lafayette Street, Street Extension and 12 Interchange Improvements, Lafayette 13 Street Extension 2,405,000 14 (Base Project Allocation - $2,405,000) 15 Section 347. Montour County. 16 Projects are as follows: 17 (1) SR 80, Concrete Reconstruction, 18 Danville Interchange Area, Valley 19 Township 230,000 20 (Base Project Allocation - $230,000) 21 (2) SR 80, Concrete Reconstruction, 22 Danville Interchange, Valley Township 95,000 23 (Base Project Allocation - $90,000) 24 (Design and Contingencies - $5,000) 25 Section 348. Northampton County. 26 Projects are as follows: 27 (1) SR 33, Park and Ride Expansion for 28 Intermodal Services and Congestion 29 Reduction, Bethlehem Township 200,000 30 (Base Project Allocation - $125,000) 20060H2468B4279 - 70 -
1 (Design and Contingencies - $75,000) 2 (2) SR 78, Installation of Closed Circuit 3 Cameras for ITS CCTV Project Phase 1, 4 Various Municipalities 470,000 5 (Base Project Allocation - $470,000) 6 (3) SR 248, Expansion of Intersection at 7 SR 248 and Blue Mountain Drive 800,000 8 (Base Project Allocation - $800,000) 9 (4) SR 78, Preventative Maintenance, I-78, 10 PA 412 to Easton and City of Bethlehem 850,000 11 (Base Project Allocation - $600,000) 12 (Land Allocation - $100,000) 13 (Design and Contingencies - $150,000) 14 (5) SR 22, SR 33, SR 78, Congestion 15 Reduction and Safety Project, Freeway 16 Service Patrol, Various along SR 22, SR 17 33 and I-78 300,000 18 (Base Project Allocation - $300,000) 19 (6) SR 33, Interchange Reconstruction, SR 20 33 and SR 512 Interchange, Wind Gap 21 Borough 500,000 22 (Base Project Allocation - $500,000) 23 (7) SR 412, Road Reconstruction and 24 Widening, SR 412 Improvement, SR 412 25 from I-78 into City of Bethlehem 3,750,000 26 (Base Project Allocation - $3,750,000) 27 Section 349. Northumberland County. 28 Projects are as follows: 29 (1) SR 54, Intersection Improvements 100,000 30 (Base Project Allocation - $100,000) 20060H2468B4279 - 71 -
1 (2) SR 3010, Relocate SR 3010, SR 3010 and 2 SR 225 Intersection Improvement, 3 Jackson Township 250,000 4 (Base Project Allocation - $200,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $40,000) 7 (3) SR 901, Roadway, Safety and Access 8 Improvements, Vicinity of SR 901 and 9 Rinehart Food Distribution Center, Coal 10 Township 100,000 11 (Base Project Allocation - $100,000) 12 Section 350. Perry County (Reserved). 13 Section 351. Philadelphia County. 14 Projects are as follows: 15 (1) SR 676, Rehabilitation, 16 Reconstruction, Operational 17 Improvements, I-95 and Vine Street 18 Interchange, City of Philadelphia 40,000,000 19 (Base Project Allocation - $40,000,000) 20 (2) SR 3013, Installation of Gateway 21 Treatment and Landscaping, Planting in 22 Median on Island Avenue, City of 23 Philadelphia 375,000 24 (Base Project Allocation - $375,000) 25 (3) SR 7301, Removal of Sedgley Avenue 26 Bridge, City of Philadelphia 1,000,000 27 (Base Project Allocation - $1,000,000) 28 (4) South Philadelphia Access Road, Design 29 and Construction, Port Access Road from 30 South Philadelphia Port and Intermodal 20060H2468B4279 - 72 -
1 Facilities, City of Philadelphia 725,000 2 (Base Project Allocation - $725,000) 3 (5) Old Delaware Avenue, Incorporate 4 Portion of Old Delaware Avenue as South 5 Philadelphia Port Access Road, City of 6 Philadelphia 100,000 7 (Base Project Allocation - $100,000) 8 (6) I-95, Roadway, Safety and Access 9 Improvements, Construct Access Roads 10 and Roadway Improvements Associated 11 with a New Food Distribution Center and 12 Other Development in the Philadelphia 13 Navy Yard, City of Philadelphia 45,000,000 14 (Base Project Allocation - $40,000,000) 15 (Design and Contingencies - $5,000,000) 16 Section 352. Pike County. 17 Projects are as follows: 18 (1) SR 84, I-84 Reconstruction, SR 6 to 19 New York Line, Various Municipalities 400,000 20 (Design and Contingencies - $400,000) 21 (2) SR 84, NEPA SD BDG, I-84 Bridges, 22 Greene and Palmyra Townships 725,000 23 (Base Project Allocation - $500,000) 24 (Design and Contingencies - $225,000) 25 Section 353. Potter County. 26 Projects are as follows: 27 (1) SR 6, Restoration and Rehabilitation 28 of Coudersport Area, Coudersport 29 Borough and Eulalia Township 252,000 30 (Base Project Allocation - $125,000) 20060H2468B4279 - 73 -
1 (Land Allocation - $2,000) 2 (Design and Contingencies - $125,000) 3 (2) SR 6, Restoration and Rehabilitation, 4 US 6, West of Galeton, Pike and Ulysses 5 Townships 1,150,000 6 (Base Project Allocation - $850,000) 7 (Land Allocation - $120,000) 8 (Design and Contingencies - $180,000) 9 (3) SR 49, Restoration and Rehabilitation, 10 Gold Road, Harrison Township 616,000 11 (Base Project Allocation - $400,000) 12 (Land Allocation - $106,000) 13 (Design and Contingencies - $110,000) 14 (4) SR 6, Safety Improvement, Signing and 15 Delineation, Eulalia Township 700,000 16 (Base Project Allocation - $500,000) 17 (Land Allocation - $50,000) 18 (Design and Contingencies - $150,000) 19 (5) SR 44, Safety Improvement, Roadway 20 Resurfacing, Eulalia Township 700,000 21 (Base Project Allocation - $500,000) 22 (Land Allocation - $50,000) 23 (Design and Contingencies - $150,000) 24 Section 354. Schuylkill County. 25 Projects are as follows: 26 (1) SR 54, Realign, Widen, Drainage 27 Improvements and Resurface SR 54 from 28 SR 309 to I-81 3,000,000 29 (Base Project Allocation - $3,000,000) 30 (2) SR 61, Safety Improvements from SR 20060H2468B4279 - 74 -
1 2014, Brick Hill Road to SR 443, 2 Including the Liberty Street 3 Intersection 20,000,000 4 (Base Project Allocation - $20,000,000) 5 (3) SR 61, Construction of Split Pair 6 North and South Lanes Deer Lake North 7 Project from SR 895 to SR 2014 42,000,000 8 (Base Project Allocation - $42,000,000) 9 (4) SR 61, Highway Restoration from the 10 Schuylkill River to the Northern 11 Borough Line 5,000,000 12 (Base Project Allocation - $5,000,000) 13 (5) SR 61, Reconstruction of Intersection 14 at SR 61, SR 2010, Adamsdale Road and 15 Liberty Street 3,000,000 16 (Base Project Allocation - $3,000,000) 17 (6) SR 61, Installation of Traffic Light 18 and Turning Lanes at the Intersection 19 of SR 61 North and Academy Lane, Butler 20 Township 175,000 21 (Base Project Allocation - $100,000) 22 (Land Allocation - $25,000) 23 (Design and Contingencies - $50,000) 24 (7) SR 309, Safety Improvements at SR 309 25 and SR 54, Rush Township 1,000,000 26 (Base Project Allocation - $1,000,000) 27 (8) SR 309, Safety Improvement at the 28 Intersection of SR 309 and SR 895 2,000,000 29 (Base Project Allocation - $2,000,000) 30 (9) SR 309, Safety, Widening and 20060H2468B4279 - 75 -
1 Signalization Improvements, Central 2 Business District from the Northern 3 Borough Line to the Southern Borough 4 Line 5,000,000 5 (Base Project Allocation - $5,000,000) 6 (10) SR 924, Elimination of S Curve, Begin 7 at the Schuylkill/Luzerne County Line, 8 Continuation of Project Improvement 9 Plan for SR 924 adjoining Humboldt 10 Industrial Park, Black Creek Township, 11 Luzerne County, to Green Mountain Road 3,000,000 12 (Base Project Allocation - $3,000,000) 13 (11) SR 2014, Reconstruction and Drainage 14 Improvements to SR 2014 from SR 443 to 15 SR 61 1,000,000 16 (Base Project Allocation - $1,000,000) 17 (12) SR 4034, Rehabilitation and 18 Resurfacing of SR 4034, Aristes Road, 19 from SR 4036 to the Columbia County 20 Line 3,000,000 21 (Base Project Allocation - $3,000,000) 22 (13) SR 4036, Rehabilitation and 23 Resurfacing of SR 4036, Little Mountain 24 Road, from SR 4033 to the Columbia 25 County Line 2,000,000 26 (Base Project Allocation - $2,000,000) 27 (14) SR 61, Roadway Restoration with 28 Safety Upgrades, SR 61, Port Clinton, 29 Port Clinton Borough and West Brunswick 30 Township 1,280,000 20060H2468B4279 - 76 -
1 (Base Project Allocation - $1,200,000) 2 (Land Allocation - $40,000) 3 (Design and Contingencies - $40,000) 4 (15) SR 81, I-81 Frackville to Mahanoy 5 City, Various Townships 1,265,000 6 (Base Project Allocation - $1,140,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $105,000) 9 (16) SR 81, I-81, SR 25 to SR 901, Mill 10 and Overlay, Frailey and Foster 11 Townships 720,000 12 (Base Project Allocation - $600,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $100,000) 15 (17) SR 81, I-81 Bridges North of SR 209, 16 Frailey Township 2,050,000 17 (Base Project Allocation - $1,600,000) 18 (Land Allocation - $50,000) 19 (Design and Contingencies - $400,000) 20 (18) SR 54, RESURFACING AND SHOULDER WORK <-- 21 ON SR 54 FROM RUSH AND RYAN TOWNSHIPS 22 THROUGH MAHANOY CITY TO ST. NICHOLAS 23 BRIDGE IN MAHANOY TOWNSHIP CONTINUING 24 ON SR 4030 TO BEGINNING OF GIRARDVILLE 25 BOROUGH 2,000,000 26 (BASE PROJECT ALLOCATION - $2,000,000) 27 (19) SR 61, SAFETY IMPROVEMENTS, SR 61 IN 28 NORTH MANHEIM AND WEST BRUNSWICK 29 TOWNSHIPS 1,000,000 30 (BASE PROJECT ALLOCATION - $1,000,000) 20060H2468B4279 - 77 -
1 (20) SR 501, TRAFFIC STUDY, SR 501 AND SR
2 443 IN PINE GROVE BOROUGH 500,000
3 (BASE PROJECT ALLOCATION - $500,000)
4 (21) SR 81, I-81 FEASIBILITY STUDY FOR A
5 THIRD LANE ON I-81 NORTH BETWEEN THE
6 RAVINE AND TREMONT/TOWER CITY EXITS 250,000
7 (BASE PROJECT ALLOCATION - $250,000)
8 (22) SR 309 AND US 209, SAFETY, WIDENING <--
9 AND SIGNALIZATION IMPROVEMENTS, CENTRAL
10 BUSINESS DISTRICT FROM THE NORTHERN
11 BOROUGH LINE TO THE SOUTHERN BOROUGH
12 LINE 5,000,000
13 (BASE PROJECT ALLOCATION - $5,000,000)
14 Section 355. Snyder County.
15 Projects are as follows:
16 (1) SR 11, Mill and Overlay Northbound
17 Lane, Selinsgrove to McKee Half Falls,
18 Chapman, Franklin and Union Townships 3,520,000
19 (Base Project Allocation - $3,500,000)
20 (Design and Contingencies - $20,000)
21 (2) SR 11, Mill and Overlay Southbound
22 Lane, Selinsgrove to McKee Half Falls,
23 Chapman, Franklin and Union Townships 3,520,000
24 (Base Project Allocation - $3,500,000)
25 (Design and Contingencies - $20,000)
26 Section 356. Somerset County (Reserved). <--
27 SECTION 356. SOMERSET COUNTY. <--
28 PROJECTS ARE AS FOLLOWS:
29 (1) SR 601, STREETSCAPE IMPROVEMENTS TO
30 CHURCH STREET, PLEASANT AVENUE, CENTER
20060H2468B4279 - 78 -
1 STREET AND RACE STREET 3,000,000
2 (BASE PROJECT ALLOCATION - $1,500,000)
3 (LAND ALLOCATION - $1,200,000)
4 (DESIGN AND CONTINGENCIES - $300,000)
5 (2) SR 601, STREETSCAPE IMPROVEMENTS TO SR <--
6 601 IN VICINITY OF SOMERSET HOSPITAL,
7 BOROUGH OF SOMERSET 1,500,000
8 (BASE PROJECT ALLOCATION - $1,200,000)
9 (DESIGN AND CONTINGENCIES - $300,000)
10 Section 357. Sullivan County (Reserved). <--
11 SECTION 357. SULLIVAN COUNTY. <--
12 PROJECTS ARE AS FOLLOWS:
13 (1) SR 42, SEGMENT 50, SAFETY
14 IMPROVEMENTS, DAVIDSON AND SHREWSBURY
15 TOWNSHIPS 1,575,000
16 (BASE PROJECT ALLOCATION - $1,300,000)
17 (DESIGN AND CONTINGENCIES - $200,000)
18 (LAND ALLOCATIONS - $75,000)
19 Section 358. Susquehanna County.
20 Projects are as follows:
21 (1) SR 11 and SR 171, Corridor
22 Improvements of SR 11 and SR 171, Great
23 Bend Township 3,600,000
24 (Base Project Allocation - $3,200,000)
25 (Land Allocation - $80,000)
26 (Design and Contingencies - $320,000)
27 (2) SR 81, I-81 Bridge PM, Lenox and
28 Harford Townships 290,000
29 (Base Project Allocation - $270,000)
30 (Design and Contingencies - $20,000)
20060H2468B4279 - 79 -
1 (3) SR 81, Preventative Maintenance,
2 Northern Tier 2005 Bridge, Various
3 Townships 260,000
4 (Base Project Allocation - $260,000)
5 (4) SR 81, Interstate Maintenance,
6 Northern Tier, Lenox and Great Bend
7 Townships 350,000
8 (Base Project Allocation - $200,000)
9 (Design and Contingencies - $150,000)
10 (5) SR 81, I-81 Exit 218, Gibson and
11 Harford Townships 300,000
12 (Design and Contingencies - $300,000)
13 Section 359. Tioga County.
14 Projects are as follows:
15 (1) SR 15 and SR 6015, Wetlands Monitoring
16 Analysis, Approximately 2.6 Miles,
17 North of Blossburg Borough, Covington
18 Township 180,000
19 (Base Project Allocation - $180,000)
20 (2) SR 6, Restoration, Mansfield to
21 Mainsburg Earmark, Mansfield Borough
22 and Richmond Township 570,000
23 (Base Project Allocation - $550,000)
24 (Design and Contingencies - $20,000)
25 Section 360. Union County (Reserved). <--
26 SECTION 360. UNION COUNTY. <--
27 PROJECTS ARE AS FOLLOWS:
28 (1) SR 11 AND SR 15, DESIGN AND
29 CONSTRUCTION OF THE CENTRAL SUSQUEHANNA
30 THRUWAY FROM SR 147 IN NORTHUMBERLAND
20060H2468B4279 - 80 -
1 COUNTY TO THE INTERSECTION WITH THE 2 SELINSGROVE BYPASS IN SNYDER COUNTY 95,000,000 3 (BASE PROJECT ALLOCATION - $95,000,000) 4 Section 361. Venango County. 5 Projects are as follows: 6 (1) SR 80, Interstate Restoration, 7 Interstate Preventative Maintenance, SR 8 80, Milepost 34 to Milepost 42, Clinton 9 and Scrubgrass Townships, and 10 Clintonville Borough 0 <-- 11 CLINTONVILLE BOROUGH 2,500,000 <-- 12 (BASE PROJECT ALLOCATION - $2,500,000) 13 (2) SR 80, I-80 Milepost 34 to Milepost 42 14 Interstate Maintenance, Clinton and 15 Scrubgrass Townships and Clintonville 16 Borough 1,000,000 17 (Base Project Allocation - $1,000,000) 18 Section 362. Warren County (Reserved). 19 Section 363. Washington County. 20 Projects are as follows: 21 (1) SR 40, Add Lane, US 40, I-70 to PA 18, 22 City of Washington 660,000 23 (Base Project Allocation - $400,000) 24 (Land Allocation - $150,000) 25 (Design and Contingencies - $110,000) 26 (2) SR 70, New Interchange, Bentleyville 27 Interchange, Bentleyville Borough 3,950,000 28 (Base Project Allocation - $3,000,000) 29 (Land Allocation - $700,000) 30 (Design and Contingencies - $250,000) 20060H2468B4279 - 81 -
1 (3) SR 70, Addition of Lane, Restoration, 2 I-70 from I-79 South to I-79 North, 3 South Strabane Township 2,900,000 4 (Base Project Allocation - $2,500,000) 5 (Land Allocation - $200,000) 6 (Design and Contingencies - $200,000) 7 (4) SR 88, Addition of a Turning Lane and 8 a Traffic Signal, Intersection of SR 88 9 and SR 837, New Eagle Borough 1,600,000 10 (Base Project Allocation - $900,000) 11 (Land Allocation - $200,000) 12 (Design and Contingencies - $500,000) 13 (5) SR 79, PM 2, South Strabane Township 510,000 14 (Base Project Allocation - $450,000) 15 (Design and Contingencies - $60,000) 16 (6) SR 70, Reconstruction No.2, I-70, 17 Buffalo and North Franklin Townships 120,000 18 (Design and Contingencies - $120,000) 19 (7) SR 70, Reconstruction, I-70 South 20 Junction to SR 519, South Strabane and 21 Somerset Townships 120,000 22 (Design and Contingencies - $120,000) 23 (8) SR 19, Corridor Safety Improvement, 24 Early Options Study, SR 19, Amwell, 25 Peters, North Strabane and South 26 Strabane Townships 20,000 27 (Design and Contingencies - $20,000) 28 (9) SR 70, Interstate Improvements, SR 70, 29 Milepost 0 to Milepost 18, Donegal, 30 Buffalo, North Franklin and Canton 20060H2468B4279 - 82 -
1 Townships and City of Washington 2,570,000 2 (Base Project Allocation - $2,000,000) 3 (Land Allocation - $70,000) 4 (Design and Contingencies - $500,000) 5 (10) SR 70, Interstate Improvements, SR 6 70, Milepost 18 to Milepost 40, South 7 Strabane, Somerset, Fallowfield 8 Townships and Bentleyville Borough 2,570,000 9 (Base Project Allocation - $2,000,000) 10 (Land Allocation - $70,000) 11 (Design and Contingencies - $500,000) 12 (11) SR 79, Interstate Improvements, SR 13 79, Milepost 21 to Milepost 34, Amwell 14 and South Strabane Townships 7,070,000 15 (Base Project Allocation - $2,000,000) 16 (Land Allocation - $70,000) 17 (Design and Contingencies - $5,000,000) 18 (12) SR 79, Interstate Improvements, SR 19 79, Milepost 34 to Milepost 49, Cecil, 20 Chartiers, North Strabane and South 21 Strabane Townships and Canonsburg 22 Borough 6,570,000 23 (Base Project Allocation - $1,500,000) 24 (Land Allocation - $70,000) 25 (Design and Contingencies - $5,000,000) 26 (13) SR 22, Highway Improvements, SR 22 27 and State Line to SR 18, Hanover 28 Township 1,270,000 29 (Base Project Allocation - $1,000,000) 30 (Land Allocation - $70,000) 20060H2468B4279 - 83 -
1 (Design and Contingencies - $200,000) 2 (14) SR 22, Highway Improvements, SR 22 3 and SR 18 to County Line, Hanover, 4 Smith and Robinson Townships 1,270,000 5 (Base Project Allocation - $1,000,000) 6 (Land Allocation - $70,000) 7 (Design and Contingencies - $200,000) 8 Section 364. Wayne County (Reserved). 9 Section 365. Westmoreland County. 10 Projects are as follows: 11 (1) SR 0, New Roadway, Congestion 12 Reduction, Jeannette Truck Route, City 13 of Jeannette 864,000 14 (Base Project Allocation - $750,000) 15 (Land Allocation - $30,000) 16 (Design and Contingencies - $84,000) 17 (2) SR 30, Corridor Safety, Congestion 18 Reduction, US 30 Corridor Safety 19 Improvements, Irwin Borough, Hempfield 20 and North Huntingdon Townships 3,130,000 21 (Base Project Allocation - $3,000,000) 22 (Land Allocation - $30,000) 23 (Design and Contingencies - $100,000) 24 (3) SR 31, Intersection Improvements, SR 25 31 at Braddock Avenue, Mt. Pleasant 26 Borough 550,000 27 (Base Project Allocation - $200,000) 28 (Land Allocation - $150,000) 29 (Design and Contingencies - $200,000) 30 (4) SR 66, Intersection and Approaches 20060H2468B4279 - 84 -
1 Signal Improvements and Additional 2 Lane, SR 66, Beaver Run Road, 3 Washington Township 910,000 4 (Base Project Allocation - $160,000) 5 (Land Allocation - $225,000) 6 (Design and Contingencies - $525,000) 7 (5) SR 982, Signal Enhancements and 8 Miscellaneous Roadway Work, 9 Westmoreland County, Traffic Signal 10 Enhancements, Various Municipalities 667,000 11 (Base Project Allocation - $480,000) 12 (Land Allocation - $125,000) 13 (Design and Contingencies - $62,000) 14 (6) SR 1053, Widen and Restoration of 15 Georges Station Road, Hempfield 16 Township 1,150,000 17 (Base Project Allocation - $200,000) 18 (Land Allocation - $500,000) 19 (Design and Contingencies - $450,000) 20 (7) SR 3011, Intersection, Safety and 21 Drainage Improvements, SR 3011, Finley 22 Road, Rostraver Township 370,000 23 (Base Project Allocation - $300,000) 24 (Land Allocation - $70,000) 25 (8) SR 70, Interstate Improvements, SR 70 26 Milepost 40 to Milepost 48, Rostraver 27 and South Huntingdon Townships and 28 Speers and North Belle Vernon Boroughs 2,570,000 29 (Base Project Allocation - $2,000,000) 30 (Land Allocation - $70,000) 20060H2468B4279 - 85 -
1 (Design and Contingencies - $500,000) 2 (9) SR 70, Interstate Improvements, SR 70, 3 Milepost 48 to Milepost 57.5, South 4 Huntingdon, Sewickley and Hempfield 5 Townships and New Stanton Borough 2,570,000 6 (Base Project Allocation - $2,000,000) 7 (Land Allocation - $70,000) 8 (Design and Contingencies - $500,000) 9 (10) SR 136, Signal Improvement, SR 136 at 10 T-30 Eastbound Ramp, City of 11 Greensburg 330,000 12 (Base Project Allocation - $100,000) 13 (Land Allocation - $50,000) 14 (Design and Contingencies - $180,000) 15 (11) SR 51, Intersection Improvements, SR 16 51 and Darr Road Intersection, 17 Rostraver Township 258,000 18 (Base Project Allocation - $156,000) 19 (Land Allocation - $36,000) 20 (Design and Contingencies - $66,000) 21 (12) SR 1045, Relocation, SR 1045 22 Relocation Phase 2, Unity Township 460,000 23 (Base Project Allocation - $460,000) 24 (13) SR 70, I-70, Smithton Bridge to 25 Smithton Interchange, Rostraver and 26 South Huntingdon Townships 100,000 27 (Design and Contingencies - $100,000) 28 (14) US 30, PERFORM ROADWAY NOISE STUDY, <-- 29 CONDUCT PUBLIC MEETING, DESIGN AND 30 INSTALL 1,865 FEET OF SOUND WALL IN A 20060H2468B4279 - 86 -
1 DEMONSTRATION PROJECT ALONG TODD SCHOOL 2 ROAD, TAKE EIGHT STRIPS OF PRIVATE 3 PROPERTY AND ONE HOUSE, RELOCATE SMALL 4 PORTION OF ROADWAY, HEMPFIELD TOWNSHIP 2,500,000 5 (BASE PROJECT ALLOCATION - $1,880,000) 6 (LAND ALLOCATION - $210,000) 7 (DESIGN AND CONTINGENCIES - $410,000) 8 Section 366. Wyoming County (Reserved). 9 Section 367. York County. 10 Projects are as follows: 11 (1) SR 177, Provide Left Turn Lanes at the 12 Intersection of Industrial Drive and 13 Yorktown Road, Fairview Township 1,000,000 14 (Base Project Allocation - $1,000,000) 15 (2) SR 3070 and SR 94, Intersection 16 Relocation, Roadway Realignments and 17 Traffic Signal, Intersection of SR 18 3070, Black Rock Road with SR 94, 19 Baltimore Street and Baer Avenue, Penn 20 Township 1,016,000 21 (Base Project Allocation - $640,000) 22 (Land Allocation - $200,000) 23 (Design and Contingencies - $176,000) 24 (3) Concord Road, Road Extension, Concord 25 Road, Springettsbury Township 125,000 26 (Base Project Allocation - $125,000) 27 (4) Intermodal Facility, Design and 28 Construct Access to Intermodal Facility 29 Track, Five New Lines and Switches, 30 Three New Bridges 400,000 20060H2468B4279 - 87 -
1 (Base Project Allocation - $400,000) 2 Section 368. Statewide projects. 3 Projects are as follows: 4 (1) Crawford, Forest, Venango and Warren 5 Counties, Construction and Monitoring 6 of Wetlands, Countywide Wetland 7 Banking, Various Municipalities 130,000 8 (Base Project Allocation - $60,000) 9 (Land Allocation - $30,000) 10 (Design and Contingencies - $40,000) 11 (2) Interstate Line Item, Central Office, 12 Statewide 3,700,000 13 (Base Project Allocation - $3,700,000) 14 (3) Capitalization of Infrastructure Bank, 15 Pennsylvania Infrastructure Bank, 16 Statewide 60,000,000 17 (Base Project Allocation - $60,000,000) 18 CHAPTER 5 19 (RESERVED) 20 CHAPTER 7 21 MISCELLANEOUS PROVISIONS 22 Section 701. Federal funds. 23 All moneys received from the Federal Government for the 24 construction of the projects specifically itemized in this act 25 are also hereby appropriated for those projects. 26 Section 702. Allocation of funds. 27 Whenever as determined by the Department of Transportation 28 that the full estimated financial costs of the projects itemized 29 in this act are not necessary for the proper design, acquisition 30 or construction of such projects, the excess funds no longer 20060H2468B4279 - 88 -
1 required may be allocated by the Department of Transportation to 2 increase the estimated costs of any one or more of the projects 3 specifically itemized in a capital budget. 4 Section 703. Estimated useful life. 5 The General Assembly states that the estimated useful life of 6 the highway capital projects itemized in this act is 30 years. 7 Section 704. Effective date. 8 This act shall take effect immediately. B13L86BIL/20060H2468B4279 - 89 -