                                                      PRINTER'S NO. 3600

THE GENERAL ASSEMBLY OF PENNSYLVANIA


HOUSE BILL

No. 2468 Session of 2006


        INTRODUCED BY GOOD, GEIST AND McCALL, FEBRUARY 15, 2006

        REFERRED TO COMMITTEE ON TRANSPORTATION, FEBRUARY 15, 2006

                                     AN ACT

     1  Providing for the highway capital budget project itemization for
     2     the fiscal year 2005-2006.

     3     The General Assembly of the Commonwealth of Pennsylvania
     4  hereby enacts as follows:
     5                             CHAPTER 1
     6                         GENERAL PROVISIONS
     7  Section 101.  Short title.
     8     This act shall be known and may be cited as the Highway
     9  Capital Budget Project Itemization Act of 2005-2006.
    10  Section 102.  Total authorization.
    11     The total authorization for the capital projects itemized in
    12  Chapter 3 and to be constructed by the Department of
    13  Transportation, its successors or assigns and to be financed
    14  from current revenues of the Motor License Fund shall be
    15  $0,000,000,000.
    16  Section 103.  Itemization of public highway projects.
    17     Additional capital projects in the category of public highway


     1  projects to be constructed by the Department of Transportation,
     2  its successors or assigns and to be financed from current
     3  revenues of the Motor License Fund are itemized in Chapter 3,
     4  together with their respective estimated financial costs.
     5                             CHAPTER 3
     6                         ITEMIZED PROJECTS
     7                                                           Total
     8                                                          Project
     9             Project                                    Allocation
    10  Section 301.  Adams County (Reserved).
    11  Section 302.  Allegheny County.
    12     (a)  SR 8
    13         (1)  Highway Restoration, SR 8 Segment 410
    14             to Segment 461, Richland Township             540,000
    15             (Base Project Allocation - $540,000)
    16     (b)  SR 19
    17         (1)  Highway Restoration, SR 19 Segment 60
    18             to Segment 91, Bethel Park Borough,
    19             Mount Lebanon and Upper St. Clair
    20             Townships                                     320,000
    21             (Base Project Allocation - $320,000)
    22     (c)  SR 22
    23         (1)  Highway Restoration, SR 22 Segment 170
    24             to Segment 221, Collier and Robinson
    25             Townships                                     400,000
    26             (Base Project Allocation - $400,000)
    27     (d)  SR 48
    28         (1)  Highway Restoration, SR 48 Segment 350
    29             to Segment 401, Monroeville Borough           324,000
    30             (Base Project Allocation - $324,000)
    20060H2468B3600                  - 2 -     

     1     (e)  SR 50
     2         (1)  Highway Restoration, SR 50 Segment 140
     3             to Segment 212, Collier and Scott
     4             Townships, Carnegie and Heidelberg
     5             Boroughs                                      510,000
     6             (Base Project Allocation - $510,000)
     7     (f)  SR 60
     8         (1)  Highway Restoration, SR 60 Segment 240
     9             to Segment 283 Parkway West, Moon,
    10             North Fayette and Robinson Townships          470,000
    11             (Base Project Allocation - $460,000)
    12             (Design and Contingencies - $10,000)
    13     (g)  SR 837
    14         (1)  Highway Restoration, SR 837 Segment
    15             170 to Segment 210, City of Clairton,
    16             West Mifflin and Dravosburg Boroughs          368,000
    17             (Base Project Allocation - $368,000)
    18     (h)  SR 910
    19         (1)  Highway Restoration, SR 910 Segment
    20             390 to Segment 444, Harmar and Indiana
    21             Townships                                     370,000
    22             (Base Project Allocation - $370,000)
    23     (i)  SR 2028
    24         (1)  Highway Restoration, SR 2028 Segment
    25             80 to Segment 90, City of Clairton, St.
    26             Claire Avenue                                  80,000
    27             (Base Project Allocation - $80,000)
    28     (j)  SR 2037
    29         (1)  Highway Restoration, 2037/Pt. Perry-
    30             Electric Tri-Boro Expressway, North
    20060H2468B3600                  - 3 -     

     1             Versailles Township and East Pittsburgh
     2             Borough                                     1,099,000
     3             (Base Project Allocation - $1,089,000)
     4             (Design and Contingencies - $10,000)
     5     (k)  SR 3160
     6         (1)  Highway Restoration, SR 3160 Segment
     7             10 to Segment 61, Moon Township               636,000
     8             (Base Project Allocation - $636,000)
     9     (l)  SR 4003
    10         (1)  Highway Restoration, SR 4003 Segment
    11             10 and Segment 11, McKnight Road, City
    12             of Pittsburgh                                 304,000
    13             (Base Project Allocation - $304,000)
    14     (m)  North Shore Transportation Connection,
    15         (1)  Road Improvements, HOV Modification,
    16             City of Pittsburgh                            375,000
    17             (Base Project Allocation - $375,000)
    18     (n)  I-79
    19         (1)  Road Construction, I-79 to Mon-Fayette
    20             Section of Southern Beltway, City of
    21             Pittsburgh                                    300,000
    22             (Base Project Allocation - $300,000)
    23     (o)  US 22
    24         (1)  Road Construction, US 22 to I-79
    25             Section of Southern Beltway, City of
    26             Pittsburgh                                     75,000
    27             (Base Project Allocation - $75,000)
    28         (2)  Road Construction, US 22 to I-79
    29             Section of Southern Beltway, City of
    30             Pittsburgh                                    300,000
    20060H2468B3600                  - 4 -     

     1             (Base Project Allocation - $300,000)
     2  Section 303.  Armstrong County.
     3     (a)  SR 28/66
     4         (1)  Highway Reconstruction, Goheenville
     5             Dip, Boggs and Wayne Townships              1,000,000
     6             (Base Project Allocation - $600,000)
     7             (Land Allocation - $300,000)
     8             (Design and Contingencies - $100,000)
     9  Section 304.  Beaver County.
    10     (a)  SR 18
    11         (1)  Highway Restoration, SR 18, Wallace
    12             Run Road, SR 351, Big Beaver Boulevard,
    13             Homewood and Koppel                           500,000
    14             (Base Project Allocation - $500,000)
    15     (b)  SR 51
    16         (1)  Highway Reconstruction, SR 51,
    17             Franklin Avenue Bridge/Ambridge
    18             Aliquippa 2, City of Aliquippa and
    19             Hopewell Township                           1,810,000
    20             (Base Project Allocation - $1,800,000)
    21             (Design and Contingencies - $10,000)
    22     (c)  SR 151
    23         (1)  Highway Restoration, SR 151, Brodhead
    24             Road Route 51, Hopewell Township, South
    25             Heights Borough                               400,000
    26             (Base Project Allocation - $400,000)
    27         (2)  Highway Restoration, SR 151 Segment 10
    28             to Segment 50, Greene, Independence,
    29             Hanover and Raccoon Townships                 700,000
    30             (Base Project Allocation - $700,000)
    20060H2468B3600                  - 5 -     

     1     (d)  SR 288
     2         (1)  Highway Restoration, SR 288 Segment
     3             100 to Segment 120, Franklin Township         310,000
     4             (Base Project Allocation - $310,000)
     5         (2)  Highway Restoration, SR 288 Segment
     6             130 to Segment 150, Franklin Township         310,000
     7             (Base Project Allocation - $310,000)
     8     (e)  SR 588
     9         (1)  Highway Restoration, SR 588, Eastvale
    10             Borough, Mercer Bennett Run, North
    11             Sewickley Township                            320,000
    12             (Base Project Allocation - $320,000)
    13     (f)  SR 3017
    14         (1)  Highway Restoration, SR 3017/SR 60,
    15             Brodhead Road, Center Township                830,000
    16             (Base Project Allocation - $800,000)
    17             (Design and Contingencies - $30,000)
    18     (g)  SR 4028
    19         (1)  Highway Restoration, SR 4028/SR 68,
    20             Third Street, Beaver Borough and
    21             Vanport Township                              315,000
    22             (Base Project Allocation - $310,000)
    23             (Design and Contingencies - $5,000)
    24     (h)  SR 4035
    25         (1)  Highway Restoration, SR 4035 Segment
    26             20 to Segment 50, Brighton Township           310,000
    27             (Base Project Allocation - $310,000)
    28     (i)  SR 4051
    29         (1)  Highway Restoration, SR 4051, Buffalo
    30             - Gypsy Glen, Beaver Borough                  320,000
    20060H2468B3600                  - 6 -     

     1             (Base Project Allocation - $310,000)
     2             (Design and Contingencies - $10,000)
     3  Section 305.  Bedford County.
     4     (a)  SR 4009
     5         (1)  Safety Improvement, Sunnyside Road
     6             Signal Improvement, Bedford Borough           155,000
     7             (Base Project Allocation - $125,000)
     8             (Land Allocation - $2,000)
     9             (Design and Contingencies - $28,000)
    10  Section 306.  Berks County.
    11     (a)  SR 73
    12         (1)  Radius Flattening/Safety, SR 73/1010,
    13             Maiden Creek Township                         300,000
    14             (Base Project Allocation - $70,000)
    15             (Land Allocation - $200,000)
    16             (Design and Contingencies - $30,000)
    17     (b)  SR 183
    18         (1)  Intersection Improvement, SR 183/4016
    19             Jefferson Township                          2,100,000
    20             (Base Project Allocation - $1,400,000)
    21             (Land Allocation - $200,000)
    22             (Design and Contingencies - $500,000)
    23     (c)  SR 724
    24         (1)  Guiderail/Safety Improvements, Berks
    25             Guiderail Upgrade, Various
    26             Municipalities                                110,000
    27             (Base Project Allocation - $100,000)
    28             (Design and Contingencies - $10,000)
    29     (d)  SR 2005
    30         (1)  Congestion Reduction, Route 222
    20060H2468B3600                  - 7 -     

     1             Business CCIP, City of Reading and
     2             Muhlenberg Township                           525,000
     3             (Base Project Allocation - $400,000)
     4             (Design and Contingencies - $125,000)
     5  Section 307.  Blair County (Reserved).
     6  Section 308.  Bradford County (Reserved).
     7  Section 309.  Bucks County.
     8     (a)  SR 263
     9         (1)  Widening, Channelization,
    10             Signalization and Lighting, PA 263,
    11             County Line to Bristol, Warminster
    12             Township                                      670,000
    13             (Base Project Allocation - $670,000)
    14     (b)  US 13
    15         (1)  Reconstruction, Redevelopment and
    16             Beautification, US 13 Corridor              1,250,000
    17             (Base Project Allocation - $1,250,000)
    18     (c)  Protzner Road
    19         (1)  Design and Construction, Protzner Road
    20             Connector                                     800,000
    21             (Base Project Allocation - $800,000)
    22     (d)  Swamp Road
    23         (1)  Safety and Roadway Improvements, Swamp
    24             Road Corridor                                 600,000
    25             (Base Project Allocation - $600,000)
    26  Section 310.  Butler County.
    27     (a)  SR 3022
    28         (1)  Highway Reconstruction, Rochester
    29             Road, Cranberry Township                      885,000
    30             (Base Project Allocation - $650,000)
    20060H2468B3600                  - 8 -     

     1             (Land Allocation - $200,000)
     2             (Design and Contingencies - $35,000)
     3  Section 311.  Cambria County.
     4     (a)  SR 271
     5         (1)  Safety Improvement, Flatten Curve,
     6             Phoebe Court Curves, City of Johnstown        155,000
     7             (Base Project Allocation - $125,000)
     8             (Land Allocation - $2,000)
     9             (Design and Contingencies - $28,000)
    10  Section 312.  Cameron County (Reserved).
    11  Section 313.  Carbon County (Reserved).
    12  Section 314.  Centre County.
    13     (a)  SR 99
    14         (1)  ITS Installation, I-99, Port Matilda
    15             to I-80                                     2,600,000
    16             (Base Project Allocation - $2,600,000)
    17  Section 315.  Chester County.
    18     (a)  SR 29
    19         (1)  Additional Right and Left Turning
    20             Lanes, PA 29 Phase III, East Whiteland
    21             and Charlestown Townships                   2,950,000
    22             (Base Project Allocation - $1,900,000)
    23             (Land Allocation - $400,000)
    24             (Design and Contingencies - $650,000)
    25     (b)  SR 202
    26         (1)  Roadway and Bridge Reconstruction, US
    27             202, Exton Bypass - Route 29, East
    28             Whiteland Township                         14,200,000
    29             (Base Project Allocation - $14,200,000)
    30     (c)  SR 1002
    20060H2468B3600                  - 9 -     

     1         (1)  Improve Hazardous and Congested
     2             Intersection by Eliminating Offset and
     3             Adding Left Turn Lanes, Swedesford at
     4             Valley Road, Tredyffrin Township              160,000
     5             (Base Project Allocation - $160,000)
     6     (d)  SR 1055
     7         (1)  Construct Two-Lane or Three-Lane
     8             Highway on New Alignment, Eagle Loop
     9             Road, South Link, Upper Uwchlan
    10             Township                                    1,020,000
    11             (Base Project Allocation - $1,020,000)
    12     (e)  US 30
    13         (1)  Reconstruction, Including Travel Lanes
    14             and Shoulders, From PA 10 to US 30
    15             Business                                    1,000,000
    16             (Base Project Allocation - $1,000,000)
    17     (f)  PA 100
    18         (1)  Provide Four Through Lanes on PA 100
    19             by Constructing Two Through Lanes to
    20             the East of Ludwigs Corner                  1,000,000
    21             (Base Project Allocation - $1,000,000)
    22     (g)  French Creek Parkway
    23         (1)  Design and Construct the French Creek
    24             Parkway and Connector Roads,
    25             Phoenixville                                1,250,000
    26             (Base Project Allocation - $1,250,000)
    27  Section 316.  Clarion County.
    28     (a)  SR 368
    29         (1)  Intersection Improvement, PA 368/T-310
    30             Intersection, Licking Township                785,000
    20060H2468B3600                 - 10 -     

     1             (Base Project Allocation - $580,000)
     2             (Land Allocation - $85,000)
     3             (Design and Contingencies - $120,000)
     4  Section 317.  Clearfield County.
     5     (a)  SR 80
     6         (1)  Runoff Study, I-80, Dubois Area, Sandy
     7             Township                                      172,000
     8             (Base Project Allocation - $100,000)
     9             (Land Allocation - $2,000)
    10             (Design and Contingencies - $70,000)
    11     (b)  SR 153
    12         (1)  Safety Improvement, T-384
    13             Intersection, Woodward Township               130,000
    14             (Base Project Allocation - $100,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $20,000)
    17     (c)  SR 219
    18         (1)  Safety Improvement, SR 3011
    19             Intersection, Irishtown Road, Bloom
    20             Township                                      235,000
    21             (Base Project Allocation - $160,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $65,000)
    24         (2)  Additional Lane, Intersection
    25             Improvements, Sandy Township                  900,000
    26             (Base Project Allocation - $900,000)
    27         (3)  Restoration and Rehabilitation,
    28             Luthersburg to Anderson Creek, Brady
    29             and Bloom Townships                           662,000
    30             (Base Project Allocation - $600,000)
    20060H2468B3600                 - 11 -     

     1             (Land Allocation - $2,000)
     2             (Design and Contingencies - $60,000)
     3         (4)  SAMI, Intersection Improvements, Bell
     4             Township                                      672,000
     5             (Base Project Allocation - $600,000)
     6             (Land Allocation - $2,000)
     7             (Design and Contingencies - $70,000)
     8         (5)  SAMI, Liberty Boulevard, City of
     9             Dubois                                        210,000
    10             (Base Project Allocation - $140,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $60,000)
    13         (6)  Restoration and Rehabilitation, Brady
    14             Street Turning Lane, City of Dubois           270,000
    15             (Base Project Allocation - $270,000)
    16         (7)  Safety Improvement, Regional Traffic
    17             Study, City of Dubois, Sandy Township         340,000
    18             (Base Project Allocation - $200,000)
    19             (Land Allocation - $40,000)
    20             (Design and Contingencies - $100,000)
    21     (d)  SR 255
    22         (1)  Safety Improvement, Tyler
    23             Intersection, Huston Township                  90,000
    24             (Base Project Allocation - $70,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $10,000)
    27         (2)  Safety Improvement, Road Resurfacing,
    28             Huston Township                               280,000
    29             (Base Project Allocation - $180,000)
    30             (Land Allocation - $20,000)
    20060H2468B3600                 - 12 -     

     1             (Design and Contingencies - $80,000)
     2     (e)  SR 322
     3         (1)  Restoration and Rehabilitation,
     4             Rockton Mountain, Union Township              294,000
     5             (Base Project Allocation - $294,000)
     6     (f)  SR 970
     7         (1)  Restoration and Rehabilitation,
     8             Woodland to Shawville, Bradford and
     9             Goshen Townships                              662,000
    10             (Base Project Allocation - $600,000)
    11             (Land Allocation - $2,000)
    12             (Design and Contingencies - $60,000)
    13  Section 318.  Clinton County (Reserved).
    14  Section 319.  Columbia County.
    15     (a)  SR 42 and SR 4009
    16         (1)  Intersection Improvements,
    17             Intersection of SR 42 and SR 4009,
    18             Mount Pleasant Township                     1,300,000
    19             (Base Project Allocation - $1,000,000)
    20             (Land Allocation - $100,000)
    21             (Design and Contingencies - $200,000)
    22     (b)  SR 80
    23         (1)  Safety Improvement, Low Head Dam
    24             Removal, Mount Pleasant and Scott
    25             Townships                                      70,000
    26             (Base Project Allocation - $50,000)
    27             (Design and Contingencies - $20,000)
    28     (c)  Various
    29         (1)  Wetlands Monitoring Analysis, Various
    30             Locations                                     100,000
    20060H2468B3600                 - 13 -     

     1             (Base Project Allocation - $100,000)
     2  Section 320.  Crawford County.
     3     (a)  SR 8
     4         (1)  Update Existing Traffic Signals, PA
     5             8/PA 27, Barber to Schwartz, Geale to
     6             Second Street, City of Titusville             130,000
     7             (Base Project Allocation - $50,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $60,000)
    10     (b)  SR 89
    11         (1)  Realignment of S Curve, SR 89 Segment
    12             60, Three Miles North of Titusville,
    13             Oil Creek Township                            350,000
    14             (Base Project Allocation - $300,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $40,000)
    17  Section 321.  Cumberland County (Reserved).
    18  Section 322.  Dauphin County.
    19     (a)  Third Street
    20         (1)  Road Extension, Third Street from I-83
    21             to Chestnut Street, City of Harrisburg      1,080,000
    22             (Base Project Allocation - $1,080,000)
    23  Section 323.  Delaware County.
    24     (a)  SR 95
    25         (1)  Construct New On/Off Ramps from US 322
    26             at Commodore Barry Bridge to PA 291,
    27             Second Street, I-95/322, Waterfront
    28             Access, Chester City                           35,000
    29             (Base Project Allocation - $35,000)
    30     (b)  SR 2016
    20060H2468B3600                 - 14 -     

     1         (1)  Signalization Improvements, Baltimore
     2             Avenue/Pike, Media Borough, Nether
     3             Providence                                  1,122,000
     4             (Base Project Allocation - $1,122,000)
     5  Section 324.  Elk County.
     6     (a)  SR 255
     7         (1)  Restoration and Rehabilitation,
     8             Million Dollar Highway, City of St.
     9             Marys                                         202,000
    10             (Base Project Allocation - $100,000)
    11             (Land Allocation - $2,000)
    12             (Design and Contingencies - $100,000)
    13  Section 325.  Erie County.
    14     (a)  SR 5
    15         (1)  Highway Restoration, Widening to Add
    16             Lane, 12th Street, Peninsula Drive to
    17             Asbury Road, City of Erie                   1,800,000
    18             (Base Project Allocation - $1,600,000)
    19             (Land Allocation - $100,000)
    20             (Design and Contingencies - $100,000)
    21     (b)  SR 426
    22         (1)  Update Existing Traffic Signals, North
    23             Center Street, South Street to Bond
    24             Street, City of Corry                         130,000
    25             (Base Project Allocation - $50,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $60,000)
    28     (c)  Sassafras Street-Erie County Convention
    29         Center
    30         (1)  Construction of a new access road,
    20060H2468B3600                 - 15 -     

     1             intersection improvements and protected
     2             railroad crossing from the Bayfront
     3             Parkway to Presque Isle Bay, New Erie
     4             Convention Center on the Sassafras
     5             Pier, City of Erie                          2,500,000
     6             (Base Project Allocation - $2,500,000)
     7  Section 326.  Fayette County.
     8     (a)  SR 21
     9         (1)  Widen SR 21 and SR 166 Intersection to
    10             48 Feet, German Township                    4,480,000
    11             (Base Project Allocation - $3,360,000)
    12             (Land Allocation - $700,000)
    13             (Design and Contingencies - $420,000)
    14         (2)  Widen SR 21 and S&T Drive Intersection
    15             to 48 Feet, German Township                 4,520,000
    16             (Base Project Allocation - $3,440,000)
    17             (Land Allocation - $600,000)
    18             (Design and Contingencies - $480,000)
    19         (3)  Widen S&T Drive to Thompson Crossing
    20             to 48 Feet, German, Menallen and South
    21             Union Townships                             3,976,000
    22             (Base Project Allocation - $2,300,000)
    23             (Land Allocation - $1,416,000)
    24             (Design and Contingencies - $260,000)
    25         (4)  Widen S&T Drive to Thompson Crossing
    26             to 48 feet, German, Menallen and South
    27             Union Townships                             4,815,000
    28             (Base Project Allocation - $2,668,000)
    29             (Land Allocation - $1,827,000)
    30             (Design and Contingencies - $320,000)
    20060H2468B3600                 - 16 -     

     1         (5)  Widen and Upgrade SR 21, Mall Entrance
     2             to SR 40, City of Uniontown and South
     3             Union Township                              1,663,000
     4             (Base Project Allocation - $1,046,000)
     5             (Land Allocation - $477,000)
     6             (Design and Contingencies - $140,000)
     7         (6)  Road Improvements, SR 21                     400,000
     8             (Base Project Allocation - $400,000)
     9     (b)  SR 40
    10         (1)  Safety Improvements, SR 40, Menallen
    11             and Wharton Townships                       3,050,000
    12             (Base Project Allocation - $2,000,000)
    13             (Land Allocation - $750,000)
    14             (Design and Contingencies - $300,000)
    15         (2)  Widen SR 40 and Redesign and Construct
    16             SR 40 and SR 119 Interchange, City of
    17             Uniontown, South Union and North Union
    18             Townships                                   2,400,000
    19             (Base Project Allocation - $2,000,000)
    20             (Land Allocation - $100,000)
    21             (Design and Contingencies - $300,000)
    22         (3)  Safety Improvement, Center Turn Lane,
    23             SR 40 from SR 166 to Morgan Street,
    24             Redstone Township                             500,000
    25             (Base Project Allocation - $300,000)
    26             (Land Allocation - $60,000)
    27             (Design and Contingencies - $140,000)
    28         (4)  Interchange Reconstruction at SR 40,
    29             SR 119 and SR 3019, Morgantown Road
    30             Interchange, South Union Township           2,400,000
    20060H2468B3600                 - 17 -     

     1             (Base Project Allocation - $2,000,000)
     2             (Land Allocation - $100,000)
     3             (Design and Contingencies - $300,000)
     4     (c)  SR 119
     5         (1)  Intersection Improvement, SR 119 at
     6             Technology Drive, North Union Township        305,000
     7             (Base Project Allocation - $200,000)
     8             (Land Allocation - $30,000)
     9             (Design and Contingencies - $75,000)
    10     (d)  SR 4020
    11         (1)  Widening, Realignment, Drainage and
    12             Resurfacing, SR 4020-03R, Luzerne
    13             Township                                      970,000
    14             (Base Project Allocation - $600,000)
    15             (Land Allocation - $200,000)
    16             (Design and Contingencies - $170,000)
    17  Section 327.  Forest County (Reserved).
    18  Section 328.  Franklin County (Reserved).
    19  Section 329.  Fulton County (Reserved).
    20  Section 330.  Greene County.
    21     (a)  SR 79
    22         (1)  Resurfacing, Shoulder Milled Rumble
    23             Strips and Raised Pavement Markers, I-
    24             79, Greene, Perry and Whiteley
    25             Townships                                   4,300,000
    26             (Base Project Allocation - $4,300,000)
    27     (b)  SR 2026
    28         (1)  Intersection Improvements, SR 2026,
    29             Franklin, Jefferson, Greene and
    30             Whiteley Townships                             80,000
    20060H2468B3600                 - 18 -     

     1             (Base Project Allocation - $80,000)
     2  Section 331.  Huntingdon County (Reserved).
     3  Section 332.  Indiana County.
     4     (a)  SR 119
     5         (1)  Highway Reconstruction, Wake Robin
     6             Curve, Rayne Township                       1,880,000
     7             (Base Project Allocation - $1,200,000)
     8             (Land Allocation - $400,000)
     9             (Design and Contingencies - $280,000)
    10     (b)  SR 286
    11         (1)  Safety Improvements, Philadelphia
    12             Street Signals, Indiana Borough                     0
    13     (c)  SR 422
    14         (1)  Highway Reconstruction, Indiana
    15             County                                      3,000,000
    16             (Base Project Allocation - $2,000,000)
    17             (Land Allocation - $600,000)
    18             (Design and Contingencies - $400,000)
    19     (d)  SR 954
    20         (1)  Safety Improvement, PA 954, Wayne,
    21             Church Signal, Indiana Borough                      0
    22  Section 333.  Jefferson County.
    23     (a)  SR 119
    24         (1)  Realignment and Reconstruction, Punxsy
    25             Narrows, Bell and Henderson Townships       3,120,000
    26             (Base Project Allocation - $1,800,000)
    27             (Land Allocation - $400,000)
    28             (Design and Contingencies - $920,000)
    29         (2)  Traffic Study, Punxsutawney Borough           50,000
    30             (Design and Contingencies - $50,000)
    20060H2468B3600                 - 19 -     

     1     (b)  SR 1010
     2         (1)  Highway Construction, Old Clay Plant
     3             Road, Brockway Borough                        650,000
     4             (Base Project Allocation - $400,000)
     5             (Land Allocation - $150,000)
     6             (Design and Contingencies - $100,000)
     7  Section 334.  Juniata County (Reserved).
     8  Section 335.  Lackawanna County.
     9     (a)  SR 6
    10         (1)  Improve Existing Exit, Robert P. Casey
    11             Highway and SR 6006, Carbondale
    12             Township                                      640,000
    13             (Base Project Allocation - $320,000)
    14             (Design and Contingencies - $320,000)
    15     (b)  SR 11
    16         (1)  Intersection Improvement, New Signal,
    17             Birney Avenue and Rocky Glen Road,
    18             Moosic Borough                                200,000
    19             (Base Project Allocation - $160,000)
    20             (Design and Contingencies - $40,000)
    21     (c)  SR 3011
    22         (1)  Intersection Improvements, New Signal,
    23             Keyser Avenue and Oak Street, Old Forge
    24             Borough                                       200,000
    25             (Base Project Allocation - $160,000)
    26             (Design and Contingencies - $40,000)
    27     (d)  SR 3015
    28         (1)  Intersection Improvement, New Signal,
    29             Main Street and Third Street, Moosic
    30             Borough                                       500,000
    20060H2468B3600                 - 20 -     

     1             (Base Project Allocation - $460,000)
     2             (Design and Contingencies - $40,000)
     3     (e)  SR 6006
     4         (1)  Install Concrete Barrier, US 6 and US
     5             11 and Exit 57, Scranton City, Dickson
     6             City Borough                                1,280,000
     7             (Base Project Allocation - $800,000)
     8             (Land Allocation - $80,000)
     9             (Design and Contingencies - $400,000)
    10  Section 336.  Lancaster County.
    11     (a)  SR 441
    12         (1)  Road Construction, Alternate Truck
    13             Route for SR 441, Columbia Borough            250,000
    14             (Base Project Allocation - $250,000)
    15  Section 337.  Lawrence County.
    16     (a)  SR 18
    17         (1)  Highway Restoration, SR 18 and SR 108,
    18             East Washington, City of New Castle           433,000
    19             (Base Project Allocation - $423,000)
    20             (Design and Contingencies - $10,000)
    21     (b)  SR 19
    22         (1)  Highway Restoration, SR 19, City of
    23             Butler and SR 108, Scott and Slippery
    24             Rock Townships                                500,000
    25             (Base Project Allocation - $500,000)
    26     (c)  SR 60
    27         (1)  Construction of Access Ramps,
    28             Millenium Park Access, Neshannock
    29             Township                                      800,000
    30             (Base Project Allocation - $200,000)
    20060H2468B3600                 - 21 -     

     1             (Land Allocation - $400,000)
     2             (Design and Contingencies - $200,000)
     3         (2)  Highway Restoration, Ben Franklin
     4             Highway, SR 60 and SR 422, Neshannock
     5             and Union Townships                           810,000
     6             (Base Project Allocation - $800,000)
     7             (Design and Contingencies - $10,000)
     8     (d)  SR 208
     9         (1)  Highway Restoration, SR 208, Means-
    10             Volant at Pearson, Volant Borough,
    11             Washington and Wilmington Townships           530,000
    12             (Base Project Allocation - $520,000)
    13             (Design and Contingencies - $10,000)
    14     (e)  SR 422
    15         (1)  Highway Restoration, SR 422, Segment
    16             10 to Segment 60, Pulaski Township            630,000
    17             (Base Project Allocation - $ 630,000)
    18         (2)  Highway Restoration, SR 422, Segment
    19             70 to Segment 120, Mahoning and Pulaski
    20             Townships                                     630,000
    21             (Base Project Allocation - $630,000)
    22     (f)  PA 60
    23         (1)  Construction of Millenium Park
    24             Interchange to Provide Access to
    25             Lawrence County Industrial Park,
    26             Neshannock Township                           210,000
    27             (Base Project Allocation - $210,000)
    28  Section 338.  Lebanon County (Reserved).
    29  Section 339.  Lehigh County.
    30     (a)  SR 145
    20060H2468B3600                 - 22 -     

     1         (1)  Congestion Reduction, South 4th Street
     2             CCIP, City of Allentown                       540,000
     3             (Base Project Allocation - $400,000)
     4             (Land Allocation - $40,000)
     5             (Design and Contingencies - $100,000)
     6  Section 340.  Luzerne County.
     7     (a)  SR 315
     8         (1)  Signal Improvement, Laflin Road to Old
     9             Boston Road, Laflin Borough to Jenkins
    10             Township                                    1,040,000
    11             (Base Project Allocation - $800,000)
    12             (Land Allocation - $80,000)
    13             (Design and Contingencies - $160,000)
    14     (b)  SR 415
    15         (1)  Intersection Improvements to Address
    16             Congestion, Dallas Borough                  1,920,000
    17             (Base Project Allocation - $1,200,000)
    18             (Land Allocation - $80,000)
    19             (Design and Contingencies - $640,000)
    20     (c)  SR 424
    21         (1)  Extension of SR 424, Hazleton Beltway
    22             to SR 924                                  11,600,000
    23             (Base Project Allocation - $8,800,000)
    24             (Land Allocation - $800,000)
    25             (Design and Contingencies - $2,000,000)
    26  Section 341.  Lycoming County.
    27     (a)  Various
    28         (1)  Wetlands Monitoring, Various
    29             Locations                                     100,000
    30             (Base Project Allocation - $100,000)
    20060H2468B3600                 - 23 -     

     1  Section 342.  McKean County.
     2     (a)  SR 219
     3         (1)  Restoration and Rehabilitation, Lewis
     4             Run to Custer City, Lafayette and
     5             Sergeant Townships                            782,000
     6             (Base Project Allocation - $700,000)
     7             (Land Allocation - $2,000)
     8             (Design and Contingencies - $80,000)
     9  Section 343.  Mercer County.
    10     (a)  Various
    11         (1)  Construct and Monitor Wetlands,
    12             Countywide Wetland Banking, Various
    13             Municipalities in Mercer County               130,000
    14             (Base Project Allocation - $60,000)
    15             (Land Allocation - $30,000)
    16             (Design and Contingencies - $40,000)
    17     (b)  East Lake Road
    18         (1)  Road Relocation, East Lake Road,
    19             Pymatuning Township                            25,000
    20             (Base Project Allocation - $25,000)
    21  Section 344.  Mifflin County.
    22     (a)  SR 22
    23         (1)  Restoration and Rehabilitation, Concrete
    24             Rehabilitation, Lewistown Borough to Derry
    25             Township                                      500,000
    26             (Base Project Allocation - $400,000)
    27             (Design and Contingencies - $100,000)
    28  Section 345.  Monroe County.
    29     (a)  SR 611
    30         (1)  Highway Reconstruction, Ramp
    20060H2468B3600                 - 24 -     

     1             Reconstruction, Bartonsville
     2             Interchange HOP, Stroud Township            3,000,000
     3             (Base Project Allocation - $3,000,000)
     4         (2)  Highway Intersection Improvements, 5
     5             Point HOP, Mount Pocono Borough               500,000
     6             (Base Project Allocation - $500,000)
     7  Section 346.  Montgomery County.
     8     (a)  SR 202
     9         (1)  Reconstruction and Widening, US 202,
    10             Morris Road to PA 63, Montgomery, Upper
    11             and Lower Gwynedd, Upper Dublin and
    12             Whitpain Townships                         32,700,000
    13             (Base Project Allocation - $32,700,000)
    14     (b)  SR 309
    15         (1)  Integration, Cheltenham Avenue to PA
    16             63 and the Link from PA 63 to US 202,
    17             Cheltenham, Springfield, Upper Dublin
    18             and Whitemarsh Townships                   15,000,000
    19             (Base Project Allocation - $15,000,000)
    20     (c)  SR 3051
    21         (1)  Widen Replacement Bridge, Old Betzwood
    22             Pedestrian Trail, West Norriton
    23             Township                                      800,000
    24             (Base Project Allocation - $800,000)
    25     (d)  SR 4031
    26         (1)  Replacement of Signal Controller
    27             equipment, Installation of Signal
    28             Preemption Equipment, Pottstown Borough
    29             and North Coventry Township                 2,000,000
    30             (Base Project Allocation - $2,000,000)
    20060H2468B3600                 - 25 -     

     1     (e)  I-476, I-76 and PA 309
     2         (1)  Intelligent Transportation System
     3             Deployment along I-476 Pennsylvania
     4             Turnpike Northeast Extension, PA 309
     5             and I-76 Schuylkill Expressway                800,000
     6             (Base Project Allocation - $800,000)
     7     (f)  SR 1058
     8         (1)  Road Construction, SR 1058 Connector
     9             Between PA 309 and Pennsylvania
    10             Turnpike Northeast Extension                  320,000
    11             (Base Project Allocation - $320,000)
    12     (g)  Lafayette Street
    13         (1)  Street Extension and Interchange
    14             Improvements, Lafayette Street
    15             Extension                                   2,405,000
    16             (Base Project Allocation - $2,405,000)
    17  Section 347.  Montour County (Reserved).
    18  Section 348.  Northampton County.
    19     (a)  SR 33
    20         (1)  Park and Ride Expansion for Intermodal
    21             Services and Congestion Reduction,
    22             Bethlehem Township                            200,000
    23             (Base Project Allocation - $125,000)
    24             (Design and Contingencies - $75,000)
    25     (b)  SR 78
    26         (1)  Installation of Closed Circuit Cameras
    27             for ITS CCTV Project Phase 1, Various
    28             Municipalities                                470,000
    29             (Base Project Allocation - $470,000)
    30  Section 349.  Northumberland County (Reserved).
    20060H2468B3600                 - 26 -     

     1  Section 350.  Perry County (Reserved).
     2  Section 351.  Philadelphia County.
     3     (a)  SR 676
     4         (1)  Rehabilitation, Reconstruction,
     5             Operational Improvements, I-95 and Vine
     6             Street Interchange, City of
     7             Philadelphia                               40,000,000
     8             (Base Project Allocation - $40,000,000)
     9     (b)  SR 3013
    10         (1)  Installation of Gateway Treatment and
    11             Landscaping, Planting in Median on
    12             Island Avenue, City of Philadelphia           375,000
    13             (Base Project Allocation - $375,000)
    14     (c)  SR 7301
    15         (1)  Removal of Sedgley Avenue Bridge, City
    16             of Philadelphia                             1,000,000
    17             (Base Project Allocation - $1,000,000)
    18     (d)  South Philadelphia Access Road
    19         (1)  Design and Construction, Port Access
    20             Road from South Philadelphia Port and
    21             Intermodal Facilities, City of
    22             Philadelphia                                  725,000
    23             (Base Project Allocation - $725,000)
    24     (e)  Old Delaware Avenue
    25         (1)  Incorporate Portion of Old Delaware
    26             Avenue as South Philadelphia Port
    27             Access Road, City of Philadelphia             100,000
    28             (Base Project Allocation - $100,000)
    29  Section 352.  Pike County (Reserved).
    30  Section 353.  Potter County.
    20060H2468B3600                 - 27 -     

     1     (a)  SR 6
     2         (1)  Restoration and Rehabilitation of
     3             Coudersport Area, Coudersport Borough
     4             and Eulalia Township                          252,000
     5             (Base Project Allocation - $125,000)
     6             (Land Allocation - $2,000)
     7             (Design and Contingencies - $125,000)
     8  Section 354.  Schuylkill County (Reserved).
     9  Section 355.  Snyder County (Reserved).
    10  Section 356.  Somerset County (Reserved).
    11  Section 357.  Sullivan County (Reserved).
    12  Section 358.  Susquehanna County.
    13     (a)  SR 11 and SR 171
    14         (1)  Corridor Improvements of SR 11 and SR
    15             171, Great Bend Township                    3,600,000
    16             (Base Project Allocation - $3,200,000)
    17             (Land Allocation - $80,000)
    18             (Design and Contingencies - $320,000)
    19  Section 359.  Tioga County.
    20     (a)  SR 15 and SR 6015
    21         (1)  Wetlands Monitoring Analysis,
    22             Approximately 2.6 Miles, North of
    23             Blossburg Borough, Covington Township         180,000
    24             (Base Project Allocation - $180,000)
    25  Section 360.  Union County (Reserved).
    26  Section 361.  Venango County (Reserved).
    27  Section 362.  Warren County (Reserved).
    28  Section 363.  Washington County.
    29     (a)  SR 40
    30         (1)  Add Lane, US 40, I-70 to PA 18, City
    20060H2468B3600                 - 28 -     

     1             of Washington                                 660,000
     2             (Base Project Allocation - $400,000)
     3             (Land Allocation - $150,000)
     4             (Design and Contingencies - $110,000)
     5     (b)  SR 70
     6         (1)  New Interchange, Bentleyville
     7             Interchange, Bentleyville Borough           3,950,000
     8             (Base Project Allocation - $3,000,000)
     9             (Land Allocation - $700,000)
    10             (Design and Contingencies - $250,000)
    11         (2)  Addition of Lane, Restoration, I-70
    12             from I-79 South to I-79 North, South
    13             Strabane Township                           2,900,000
    14             (Base Project Allocation - $2,500,000)
    15             (Land Allocation - $200,000)
    16             (Design and Contingencies - $200,000)
    17     (c)  SR 88
    18         (1)  Addition of a Turning Lane and a
    19             Traffic Signal, Intersection of SR 88
    20             and SR 837, New Eagle Borough               1,600,000
    21             (Base Project Allocation - $900,000)
    22             (Land Allocation - $200,000)
    23             (Design and Contingencies - $500,000)
    24  Section 364.  Wayne County (Reserved).
    25  Section 365.  Westmoreland County.
    26     (a)  SR 0
    27         (1)  New Roadway, Congestion Reduction,
    28             Jeannette Truck Route, City of
    29             Jeannette                                     864,000
    30             (Base Project Allocation - $750,000)
    20060H2468B3600                 - 29 -     

     1             (Land Allocation - $30,000)
     2             (Design and Contingencies - $84,000)
     3     (b)  SR 30
     4         (1)  Corridor Safety, Congestion Reduction,
     5             US 30 Corridor Safety Improvements,
     6             Irwin Borough, Hempfield and North
     7             Huntingdon Townships                        3,130,000
     8             (Base Project Allocation - $3,000,000)
     9             (Land Allocation - $30,000)
    10             (Design and Contingencies - $100,000)
    11     (c)  SR 31
    12         (1)  Intersection Improvements, SR 31 at
    13             Braddock Avenue, Mt. Pleasant Borough         550,000
    14             (Base Project Allocation - $200,000)
    15             (Land Allocation - $150,000)
    16             (Design and Contingencies - $200,000)
    17     (d)  SR 66
    18         (1)  Intersection and Approaches Signal
    19             Improvements and Additional Lane, SR
    20             66, Beaver Run Road, Washington
    21             Township                                      910,000
    22             (Base Project Allocation - $160,000)
    23             (Land Allocation - $225,000)
    24             (Design and Contingencies - $525,000)
    25     (e)  SR 982
    26         (1)  Signal Enhancements and Miscellaneous
    27             Roadway Work, Westmoreland County,
    28             Traffic Signal Enhancements, Various
    29             Municipalities                                667,000
    30             (Base Project Allocation - $480,000)
    20060H2468B3600                 - 30 -     

     1             (Land Allocation - $125,000)
     2             (Design and Contingencies - $62,000)
     3     (f)  SR 1053
     4         (1)  Widen and Restoration of Georges
     5             Station Road, Hempfield Township            1,150,000
     6             (Base Project Allocation - $200,000)
     7             (Land Allocation - $500,000)
     8             (Design and Contingencies - $450,000)
     9     (g)  SR 3011
    10         (1)  Intersection, Safety and Drainage
    11             Improvements, SR 3011, Finley Road,
    12             Rostraver Township                            370,000
    13             (Base Project Allocation - $300,000)
    14             (Land Allocation - $70,000)
    15  Section 366.  Wyoming County (Reserved).
    16  Section 367.  York County.
    17     (a)  Concord Road
    18         (1)  Road Extension, Concord Road,
    19             Springettsbury Township                       125,000
    20             (Base Project Allocation - $125,000)
    21     (b)  Intermodal Facility
    22         (1)  Design and Construct Access to
    23             Intermodal Facility Track, Five New
    24             Lines and Switches, Three New Bridges         400,000
    25             (Base Project Allocation - $400,000)
    26  Section 368.  Statewide projects.
    27     (a)  Crawford, Forest, Venango and Warren
    28         Counties
    29         (1)  Construction and Monitoring of
    30             Wetlands, Countywide Wetland Banking,
    20060H2468B3600                 - 31 -     

     1             Various Municipalities                        130,000
     2             (Base Project Allocation - $60,000)
     3             (Land Allocation - $30,000)
     4             (Design and Contingencies - $40,000)
     5                             CHAPTER 5
     6                             (RESERVED)
     7                             CHAPTER 7
     8                      MISCELLANEOUS PROVISIONS
     9  Section 701.  Federal funds.
    10     All moneys received from the Federal Government for the
    11  construction of the projects specifically itemized in this act
    12  are also hereby appropriated for those projects.
    13  Section 702.  Allocation of funds.
    14     Whenever as determined by the Department of Transportation
    15  that the full estimated financial costs of the projects itemized
    16  in this act are not necessary for the proper design, acquisition
    17  or construction of such projects, the excess funds no longer
    18  required may be allocated by the Department of Transportation to
    19  increase the estimated costs of any one or more of the projects
    20  specifically itemized in a capital budget.
    21  Section 703.  Estimated useful life.
    22     The General Assembly states that the estimated useful life of
    23  the highway capital projects itemized in this act is 30 years.
    24  Section 704.  Effective date.
    25     This act shall take effect immediately.