PRINTER'S NO. 3600
No. 2468 Session of 2006
INTRODUCED BY GOOD, GEIST AND McCALL, FEBRUARY 15, 2006
REFERRED TO COMMITTEE ON TRANSPORTATION, FEBRUARY 15, 2006
AN ACT 1 Providing for the highway capital budget project itemization for 2 the fiscal year 2005-2006. 3 The General Assembly of the Commonwealth of Pennsylvania 4 hereby enacts as follows: 5 CHAPTER 1 6 GENERAL PROVISIONS 7 Section 101. Short title. 8 This act shall be known and may be cited as the Highway 9 Capital Budget Project Itemization Act of 2005-2006. 10 Section 102. Total authorization. 11 The total authorization for the capital projects itemized in 12 Chapter 3 and to be constructed by the Department of 13 Transportation, its successors or assigns and to be financed 14 from current revenues of the Motor License Fund shall be 15 $0,000,000,000. 16 Section 103. Itemization of public highway projects. 17 Additional capital projects in the category of public highway
1 projects to be constructed by the Department of Transportation, 2 its successors or assigns and to be financed from current 3 revenues of the Motor License Fund are itemized in Chapter 3, 4 together with their respective estimated financial costs. 5 CHAPTER 3 6 ITEMIZED PROJECTS 7 Total 8 Project 9 Project Allocation 10 Section 301. Adams County (Reserved). 11 Section 302. Allegheny County. 12 (a) SR 8 13 (1) Highway Restoration, SR 8 Segment 410 14 to Segment 461, Richland Township 540,000 15 (Base Project Allocation - $540,000) 16 (b) SR 19 17 (1) Highway Restoration, SR 19 Segment 60 18 to Segment 91, Bethel Park Borough, 19 Mount Lebanon and Upper St. Clair 20 Townships 320,000 21 (Base Project Allocation - $320,000) 22 (c) SR 22 23 (1) Highway Restoration, SR 22 Segment 170 24 to Segment 221, Collier and Robinson 25 Townships 400,000 26 (Base Project Allocation - $400,000) 27 (d) SR 48 28 (1) Highway Restoration, SR 48 Segment 350 29 to Segment 401, Monroeville Borough 324,000 30 (Base Project Allocation - $324,000) 20060H2468B3600 - 2 -
1 (e) SR 50 2 (1) Highway Restoration, SR 50 Segment 140 3 to Segment 212, Collier and Scott 4 Townships, Carnegie and Heidelberg 5 Boroughs 510,000 6 (Base Project Allocation - $510,000) 7 (f) SR 60 8 (1) Highway Restoration, SR 60 Segment 240 9 to Segment 283 Parkway West, Moon, 10 North Fayette and Robinson Townships 470,000 11 (Base Project Allocation - $460,000) 12 (Design and Contingencies - $10,000) 13 (g) SR 837 14 (1) Highway Restoration, SR 837 Segment 15 170 to Segment 210, City of Clairton, 16 West Mifflin and Dravosburg Boroughs 368,000 17 (Base Project Allocation - $368,000) 18 (h) SR 910 19 (1) Highway Restoration, SR 910 Segment 20 390 to Segment 444, Harmar and Indiana 21 Townships 370,000 22 (Base Project Allocation - $370,000) 23 (i) SR 2028 24 (1) Highway Restoration, SR 2028 Segment 25 80 to Segment 90, City of Clairton, St. 26 Claire Avenue 80,000 27 (Base Project Allocation - $80,000) 28 (j) SR 2037 29 (1) Highway Restoration, 2037/Pt. Perry- 30 Electric Tri-Boro Expressway, North 20060H2468B3600 - 3 -
1 Versailles Township and East Pittsburgh 2 Borough 1,099,000 3 (Base Project Allocation - $1,089,000) 4 (Design and Contingencies - $10,000) 5 (k) SR 3160 6 (1) Highway Restoration, SR 3160 Segment 7 10 to Segment 61, Moon Township 636,000 8 (Base Project Allocation - $636,000) 9 (l) SR 4003 10 (1) Highway Restoration, SR 4003 Segment 11 10 and Segment 11, McKnight Road, City 12 of Pittsburgh 304,000 13 (Base Project Allocation - $304,000) 14 (m) North Shore Transportation Connection, 15 (1) Road Improvements, HOV Modification, 16 City of Pittsburgh 375,000 17 (Base Project Allocation - $375,000) 18 (n) I-79 19 (1) Road Construction, I-79 to Mon-Fayette 20 Section of Southern Beltway, City of 21 Pittsburgh 300,000 22 (Base Project Allocation - $300,000) 23 (o) US 22 24 (1) Road Construction, US 22 to I-79 25 Section of Southern Beltway, City of 26 Pittsburgh 75,000 27 (Base Project Allocation - $75,000) 28 (2) Road Construction, US 22 to I-79 29 Section of Southern Beltway, City of 30 Pittsburgh 300,000 20060H2468B3600 - 4 -
1 (Base Project Allocation - $300,000) 2 Section 303. Armstrong County. 3 (a) SR 28/66 4 (1) Highway Reconstruction, Goheenville 5 Dip, Boggs and Wayne Townships 1,000,000 6 (Base Project Allocation - $600,000) 7 (Land Allocation - $300,000) 8 (Design and Contingencies - $100,000) 9 Section 304. Beaver County. 10 (a) SR 18 11 (1) Highway Restoration, SR 18, Wallace 12 Run Road, SR 351, Big Beaver Boulevard, 13 Homewood and Koppel 500,000 14 (Base Project Allocation - $500,000) 15 (b) SR 51 16 (1) Highway Reconstruction, SR 51, 17 Franklin Avenue Bridge/Ambridge 18 Aliquippa 2, City of Aliquippa and 19 Hopewell Township 1,810,000 20 (Base Project Allocation - $1,800,000) 21 (Design and Contingencies - $10,000) 22 (c) SR 151 23 (1) Highway Restoration, SR 151, Brodhead 24 Road Route 51, Hopewell Township, South 25 Heights Borough 400,000 26 (Base Project Allocation - $400,000) 27 (2) Highway Restoration, SR 151 Segment 10 28 to Segment 50, Greene, Independence, 29 Hanover and Raccoon Townships 700,000 30 (Base Project Allocation - $700,000) 20060H2468B3600 - 5 -
1 (d) SR 288 2 (1) Highway Restoration, SR 288 Segment 3 100 to Segment 120, Franklin Township 310,000 4 (Base Project Allocation - $310,000) 5 (2) Highway Restoration, SR 288 Segment 6 130 to Segment 150, Franklin Township 310,000 7 (Base Project Allocation - $310,000) 8 (e) SR 588 9 (1) Highway Restoration, SR 588, Eastvale 10 Borough, Mercer Bennett Run, North 11 Sewickley Township 320,000 12 (Base Project Allocation - $320,000) 13 (f) SR 3017 14 (1) Highway Restoration, SR 3017/SR 60, 15 Brodhead Road, Center Township 830,000 16 (Base Project Allocation - $800,000) 17 (Design and Contingencies - $30,000) 18 (g) SR 4028 19 (1) Highway Restoration, SR 4028/SR 68, 20 Third Street, Beaver Borough and 21 Vanport Township 315,000 22 (Base Project Allocation - $310,000) 23 (Design and Contingencies - $5,000) 24 (h) SR 4035 25 (1) Highway Restoration, SR 4035 Segment 26 20 to Segment 50, Brighton Township 310,000 27 (Base Project Allocation - $310,000) 28 (i) SR 4051 29 (1) Highway Restoration, SR 4051, Buffalo 30 - Gypsy Glen, Beaver Borough 320,000 20060H2468B3600 - 6 -
1 (Base Project Allocation - $310,000) 2 (Design and Contingencies - $10,000) 3 Section 305. Bedford County. 4 (a) SR 4009 5 (1) Safety Improvement, Sunnyside Road 6 Signal Improvement, Bedford Borough 155,000 7 (Base Project Allocation - $125,000) 8 (Land Allocation - $2,000) 9 (Design and Contingencies - $28,000) 10 Section 306. Berks County. 11 (a) SR 73 12 (1) Radius Flattening/Safety, SR 73/1010, 13 Maiden Creek Township 300,000 14 (Base Project Allocation - $70,000) 15 (Land Allocation - $200,000) 16 (Design and Contingencies - $30,000) 17 (b) SR 183 18 (1) Intersection Improvement, SR 183/4016 19 Jefferson Township 2,100,000 20 (Base Project Allocation - $1,400,000) 21 (Land Allocation - $200,000) 22 (Design and Contingencies - $500,000) 23 (c) SR 724 24 (1) Guiderail/Safety Improvements, Berks 25 Guiderail Upgrade, Various 26 Municipalities 110,000 27 (Base Project Allocation - $100,000) 28 (Design and Contingencies - $10,000) 29 (d) SR 2005 30 (1) Congestion Reduction, Route 222 20060H2468B3600 - 7 -
1 Business CCIP, City of Reading and 2 Muhlenberg Township 525,000 3 (Base Project Allocation - $400,000) 4 (Design and Contingencies - $125,000) 5 Section 307. Blair County (Reserved). 6 Section 308. Bradford County (Reserved). 7 Section 309. Bucks County. 8 (a) SR 263 9 (1) Widening, Channelization, 10 Signalization and Lighting, PA 263, 11 County Line to Bristol, Warminster 12 Township 670,000 13 (Base Project Allocation - $670,000) 14 (b) US 13 15 (1) Reconstruction, Redevelopment and 16 Beautification, US 13 Corridor 1,250,000 17 (Base Project Allocation - $1,250,000) 18 (c) Protzner Road 19 (1) Design and Construction, Protzner Road 20 Connector 800,000 21 (Base Project Allocation - $800,000) 22 (d) Swamp Road 23 (1) Safety and Roadway Improvements, Swamp 24 Road Corridor 600,000 25 (Base Project Allocation - $600,000) 26 Section 310. Butler County. 27 (a) SR 3022 28 (1) Highway Reconstruction, Rochester 29 Road, Cranberry Township 885,000 30 (Base Project Allocation - $650,000) 20060H2468B3600 - 8 -
1 (Land Allocation - $200,000) 2 (Design and Contingencies - $35,000) 3 Section 311. Cambria County. 4 (a) SR 271 5 (1) Safety Improvement, Flatten Curve, 6 Phoebe Court Curves, City of Johnstown 155,000 7 (Base Project Allocation - $125,000) 8 (Land Allocation - $2,000) 9 (Design and Contingencies - $28,000) 10 Section 312. Cameron County (Reserved). 11 Section 313. Carbon County (Reserved). 12 Section 314. Centre County. 13 (a) SR 99 14 (1) ITS Installation, I-99, Port Matilda 15 to I-80 2,600,000 16 (Base Project Allocation - $2,600,000) 17 Section 315. Chester County. 18 (a) SR 29 19 (1) Additional Right and Left Turning 20 Lanes, PA 29 Phase III, East Whiteland 21 and Charlestown Townships 2,950,000 22 (Base Project Allocation - $1,900,000) 23 (Land Allocation - $400,000) 24 (Design and Contingencies - $650,000) 25 (b) SR 202 26 (1) Roadway and Bridge Reconstruction, US 27 202, Exton Bypass - Route 29, East 28 Whiteland Township 14,200,000 29 (Base Project Allocation - $14,200,000) 30 (c) SR 1002 20060H2468B3600 - 9 -
1 (1) Improve Hazardous and Congested 2 Intersection by Eliminating Offset and 3 Adding Left Turn Lanes, Swedesford at 4 Valley Road, Tredyffrin Township 160,000 5 (Base Project Allocation - $160,000) 6 (d) SR 1055 7 (1) Construct Two-Lane or Three-Lane 8 Highway on New Alignment, Eagle Loop 9 Road, South Link, Upper Uwchlan 10 Township 1,020,000 11 (Base Project Allocation - $1,020,000) 12 (e) US 30 13 (1) Reconstruction, Including Travel Lanes 14 and Shoulders, From PA 10 to US 30 15 Business 1,000,000 16 (Base Project Allocation - $1,000,000) 17 (f) PA 100 18 (1) Provide Four Through Lanes on PA 100 19 by Constructing Two Through Lanes to 20 the East of Ludwigs Corner 1,000,000 21 (Base Project Allocation - $1,000,000) 22 (g) French Creek Parkway 23 (1) Design and Construct the French Creek 24 Parkway and Connector Roads, 25 Phoenixville 1,250,000 26 (Base Project Allocation - $1,250,000) 27 Section 316. Clarion County. 28 (a) SR 368 29 (1) Intersection Improvement, PA 368/T-310 30 Intersection, Licking Township 785,000 20060H2468B3600 - 10 -
1 (Base Project Allocation - $580,000) 2 (Land Allocation - $85,000) 3 (Design and Contingencies - $120,000) 4 Section 317. Clearfield County. 5 (a) SR 80 6 (1) Runoff Study, I-80, Dubois Area, Sandy 7 Township 172,000 8 (Base Project Allocation - $100,000) 9 (Land Allocation - $2,000) 10 (Design and Contingencies - $70,000) 11 (b) SR 153 12 (1) Safety Improvement, T-384 13 Intersection, Woodward Township 130,000 14 (Base Project Allocation - $100,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $20,000) 17 (c) SR 219 18 (1) Safety Improvement, SR 3011 19 Intersection, Irishtown Road, Bloom 20 Township 235,000 21 (Base Project Allocation - $160,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $65,000) 24 (2) Additional Lane, Intersection 25 Improvements, Sandy Township 900,000 26 (Base Project Allocation - $900,000) 27 (3) Restoration and Rehabilitation, 28 Luthersburg to Anderson Creek, Brady 29 and Bloom Townships 662,000 30 (Base Project Allocation - $600,000) 20060H2468B3600 - 11 -
1 (Land Allocation - $2,000) 2 (Design and Contingencies - $60,000) 3 (4) SAMI, Intersection Improvements, Bell 4 Township 672,000 5 (Base Project Allocation - $600,000) 6 (Land Allocation - $2,000) 7 (Design and Contingencies - $70,000) 8 (5) SAMI, Liberty Boulevard, City of 9 Dubois 210,000 10 (Base Project Allocation - $140,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $60,000) 13 (6) Restoration and Rehabilitation, Brady 14 Street Turning Lane, City of Dubois 270,000 15 (Base Project Allocation - $270,000) 16 (7) Safety Improvement, Regional Traffic 17 Study, City of Dubois, Sandy Township 340,000 18 (Base Project Allocation - $200,000) 19 (Land Allocation - $40,000) 20 (Design and Contingencies - $100,000) 21 (d) SR 255 22 (1) Safety Improvement, Tyler 23 Intersection, Huston Township 90,000 24 (Base Project Allocation - $70,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $10,000) 27 (2) Safety Improvement, Road Resurfacing, 28 Huston Township 280,000 29 (Base Project Allocation - $180,000) 30 (Land Allocation - $20,000) 20060H2468B3600 - 12 -
1 (Design and Contingencies - $80,000) 2 (e) SR 322 3 (1) Restoration and Rehabilitation, 4 Rockton Mountain, Union Township 294,000 5 (Base Project Allocation - $294,000) 6 (f) SR 970 7 (1) Restoration and Rehabilitation, 8 Woodland to Shawville, Bradford and 9 Goshen Townships 662,000 10 (Base Project Allocation - $600,000) 11 (Land Allocation - $2,000) 12 (Design and Contingencies - $60,000) 13 Section 318. Clinton County (Reserved). 14 Section 319. Columbia County. 15 (a) SR 42 and SR 4009 16 (1) Intersection Improvements, 17 Intersection of SR 42 and SR 4009, 18 Mount Pleasant Township 1,300,000 19 (Base Project Allocation - $1,000,000) 20 (Land Allocation - $100,000) 21 (Design and Contingencies - $200,000) 22 (b) SR 80 23 (1) Safety Improvement, Low Head Dam 24 Removal, Mount Pleasant and Scott 25 Townships 70,000 26 (Base Project Allocation - $50,000) 27 (Design and Contingencies - $20,000) 28 (c) Various 29 (1) Wetlands Monitoring Analysis, Various 30 Locations 100,000 20060H2468B3600 - 13 -
1 (Base Project Allocation - $100,000) 2 Section 320. Crawford County. 3 (a) SR 8 4 (1) Update Existing Traffic Signals, PA 5 8/PA 27, Barber to Schwartz, Geale to 6 Second Street, City of Titusville 130,000 7 (Base Project Allocation - $50,000) 8 (Land Allocation - $20,000) 9 (Design and Contingencies - $60,000) 10 (b) SR 89 11 (1) Realignment of S Curve, SR 89 Segment 12 60, Three Miles North of Titusville, 13 Oil Creek Township 350,000 14 (Base Project Allocation - $300,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $40,000) 17 Section 321. Cumberland County (Reserved). 18 Section 322. Dauphin County. 19 (a) Third Street 20 (1) Road Extension, Third Street from I-83 21 to Chestnut Street, City of Harrisburg 1,080,000 22 (Base Project Allocation - $1,080,000) 23 Section 323. Delaware County. 24 (a) SR 95 25 (1) Construct New On/Off Ramps from US 322 26 at Commodore Barry Bridge to PA 291, 27 Second Street, I-95/322, Waterfront 28 Access, Chester City 35,000 29 (Base Project Allocation - $35,000) 30 (b) SR 2016 20060H2468B3600 - 14 -
1 (1) Signalization Improvements, Baltimore 2 Avenue/Pike, Media Borough, Nether 3 Providence 1,122,000 4 (Base Project Allocation - $1,122,000) 5 Section 324. Elk County. 6 (a) SR 255 7 (1) Restoration and Rehabilitation, 8 Million Dollar Highway, City of St. 9 Marys 202,000 10 (Base Project Allocation - $100,000) 11 (Land Allocation - $2,000) 12 (Design and Contingencies - $100,000) 13 Section 325. Erie County. 14 (a) SR 5 15 (1) Highway Restoration, Widening to Add 16 Lane, 12th Street, Peninsula Drive to 17 Asbury Road, City of Erie 1,800,000 18 (Base Project Allocation - $1,600,000) 19 (Land Allocation - $100,000) 20 (Design and Contingencies - $100,000) 21 (b) SR 426 22 (1) Update Existing Traffic Signals, North 23 Center Street, South Street to Bond 24 Street, City of Corry 130,000 25 (Base Project Allocation - $50,000) 26 (Land Allocation - $20,000) 27 (Design and Contingencies - $60,000) 28 (c) Sassafras Street-Erie County Convention 29 Center 30 (1) Construction of a new access road, 20060H2468B3600 - 15 -
1 intersection improvements and protected 2 railroad crossing from the Bayfront 3 Parkway to Presque Isle Bay, New Erie 4 Convention Center on the Sassafras 5 Pier, City of Erie 2,500,000 6 (Base Project Allocation - $2,500,000) 7 Section 326. Fayette County. 8 (a) SR 21 9 (1) Widen SR 21 and SR 166 Intersection to 10 48 Feet, German Township 4,480,000 11 (Base Project Allocation - $3,360,000) 12 (Land Allocation - $700,000) 13 (Design and Contingencies - $420,000) 14 (2) Widen SR 21 and S&T Drive Intersection 15 to 48 Feet, German Township 4,520,000 16 (Base Project Allocation - $3,440,000) 17 (Land Allocation - $600,000) 18 (Design and Contingencies - $480,000) 19 (3) Widen S&T Drive to Thompson Crossing 20 to 48 Feet, German, Menallen and South 21 Union Townships 3,976,000 22 (Base Project Allocation - $2,300,000) 23 (Land Allocation - $1,416,000) 24 (Design and Contingencies - $260,000) 25 (4) Widen S&T Drive to Thompson Crossing 26 to 48 feet, German, Menallen and South 27 Union Townships 4,815,000 28 (Base Project Allocation - $2,668,000) 29 (Land Allocation - $1,827,000) 30 (Design and Contingencies - $320,000) 20060H2468B3600 - 16 -
1 (5) Widen and Upgrade SR 21, Mall Entrance 2 to SR 40, City of Uniontown and South 3 Union Township 1,663,000 4 (Base Project Allocation - $1,046,000) 5 (Land Allocation - $477,000) 6 (Design and Contingencies - $140,000) 7 (6) Road Improvements, SR 21 400,000 8 (Base Project Allocation - $400,000) 9 (b) SR 40 10 (1) Safety Improvements, SR 40, Menallen 11 and Wharton Townships 3,050,000 12 (Base Project Allocation - $2,000,000) 13 (Land Allocation - $750,000) 14 (Design and Contingencies - $300,000) 15 (2) Widen SR 40 and Redesign and Construct 16 SR 40 and SR 119 Interchange, City of 17 Uniontown, South Union and North Union 18 Townships 2,400,000 19 (Base Project Allocation - $2,000,000) 20 (Land Allocation - $100,000) 21 (Design and Contingencies - $300,000) 22 (3) Safety Improvement, Center Turn Lane, 23 SR 40 from SR 166 to Morgan Street, 24 Redstone Township 500,000 25 (Base Project Allocation - $300,000) 26 (Land Allocation - $60,000) 27 (Design and Contingencies - $140,000) 28 (4) Interchange Reconstruction at SR 40, 29 SR 119 and SR 3019, Morgantown Road 30 Interchange, South Union Township 2,400,000 20060H2468B3600 - 17 -
1 (Base Project Allocation - $2,000,000) 2 (Land Allocation - $100,000) 3 (Design and Contingencies - $300,000) 4 (c) SR 119 5 (1) Intersection Improvement, SR 119 at 6 Technology Drive, North Union Township 305,000 7 (Base Project Allocation - $200,000) 8 (Land Allocation - $30,000) 9 (Design and Contingencies - $75,000) 10 (d) SR 4020 11 (1) Widening, Realignment, Drainage and 12 Resurfacing, SR 4020-03R, Luzerne 13 Township 970,000 14 (Base Project Allocation - $600,000) 15 (Land Allocation - $200,000) 16 (Design and Contingencies - $170,000) 17 Section 327. Forest County (Reserved). 18 Section 328. Franklin County (Reserved). 19 Section 329. Fulton County (Reserved). 20 Section 330. Greene County. 21 (a) SR 79 22 (1) Resurfacing, Shoulder Milled Rumble 23 Strips and Raised Pavement Markers, I- 24 79, Greene, Perry and Whiteley 25 Townships 4,300,000 26 (Base Project Allocation - $4,300,000) 27 (b) SR 2026 28 (1) Intersection Improvements, SR 2026, 29 Franklin, Jefferson, Greene and 30 Whiteley Townships 80,000 20060H2468B3600 - 18 -
1 (Base Project Allocation - $80,000) 2 Section 331. Huntingdon County (Reserved). 3 Section 332. Indiana County. 4 (a) SR 119 5 (1) Highway Reconstruction, Wake Robin 6 Curve, Rayne Township 1,880,000 7 (Base Project Allocation - $1,200,000) 8 (Land Allocation - $400,000) 9 (Design and Contingencies - $280,000) 10 (b) SR 286 11 (1) Safety Improvements, Philadelphia 12 Street Signals, Indiana Borough 0 13 (c) SR 422 14 (1) Highway Reconstruction, Indiana 15 County 3,000,000 16 (Base Project Allocation - $2,000,000) 17 (Land Allocation - $600,000) 18 (Design and Contingencies - $400,000) 19 (d) SR 954 20 (1) Safety Improvement, PA 954, Wayne, 21 Church Signal, Indiana Borough 0 22 Section 333. Jefferson County. 23 (a) SR 119 24 (1) Realignment and Reconstruction, Punxsy 25 Narrows, Bell and Henderson Townships 3,120,000 26 (Base Project Allocation - $1,800,000) 27 (Land Allocation - $400,000) 28 (Design and Contingencies - $920,000) 29 (2) Traffic Study, Punxsutawney Borough 50,000 30 (Design and Contingencies - $50,000) 20060H2468B3600 - 19 -
1 (b) SR 1010 2 (1) Highway Construction, Old Clay Plant 3 Road, Brockway Borough 650,000 4 (Base Project Allocation - $400,000) 5 (Land Allocation - $150,000) 6 (Design and Contingencies - $100,000) 7 Section 334. Juniata County (Reserved). 8 Section 335. Lackawanna County. 9 (a) SR 6 10 (1) Improve Existing Exit, Robert P. Casey 11 Highway and SR 6006, Carbondale 12 Township 640,000 13 (Base Project Allocation - $320,000) 14 (Design and Contingencies - $320,000) 15 (b) SR 11 16 (1) Intersection Improvement, New Signal, 17 Birney Avenue and Rocky Glen Road, 18 Moosic Borough 200,000 19 (Base Project Allocation - $160,000) 20 (Design and Contingencies - $40,000) 21 (c) SR 3011 22 (1) Intersection Improvements, New Signal, 23 Keyser Avenue and Oak Street, Old Forge 24 Borough 200,000 25 (Base Project Allocation - $160,000) 26 (Design and Contingencies - $40,000) 27 (d) SR 3015 28 (1) Intersection Improvement, New Signal, 29 Main Street and Third Street, Moosic 30 Borough 500,000 20060H2468B3600 - 20 -
1 (Base Project Allocation - $460,000) 2 (Design and Contingencies - $40,000) 3 (e) SR 6006 4 (1) Install Concrete Barrier, US 6 and US 5 11 and Exit 57, Scranton City, Dickson 6 City Borough 1,280,000 7 (Base Project Allocation - $800,000) 8 (Land Allocation - $80,000) 9 (Design and Contingencies - $400,000) 10 Section 336. Lancaster County. 11 (a) SR 441 12 (1) Road Construction, Alternate Truck 13 Route for SR 441, Columbia Borough 250,000 14 (Base Project Allocation - $250,000) 15 Section 337. Lawrence County. 16 (a) SR 18 17 (1) Highway Restoration, SR 18 and SR 108, 18 East Washington, City of New Castle 433,000 19 (Base Project Allocation - $423,000) 20 (Design and Contingencies - $10,000) 21 (b) SR 19 22 (1) Highway Restoration, SR 19, City of 23 Butler and SR 108, Scott and Slippery 24 Rock Townships 500,000 25 (Base Project Allocation - $500,000) 26 (c) SR 60 27 (1) Construction of Access Ramps, 28 Millenium Park Access, Neshannock 29 Township 800,000 30 (Base Project Allocation - $200,000) 20060H2468B3600 - 21 -
1 (Land Allocation - $400,000) 2 (Design and Contingencies - $200,000) 3 (2) Highway Restoration, Ben Franklin 4 Highway, SR 60 and SR 422, Neshannock 5 and Union Townships 810,000 6 (Base Project Allocation - $800,000) 7 (Design and Contingencies - $10,000) 8 (d) SR 208 9 (1) Highway Restoration, SR 208, Means- 10 Volant at Pearson, Volant Borough, 11 Washington and Wilmington Townships 530,000 12 (Base Project Allocation - $520,000) 13 (Design and Contingencies - $10,000) 14 (e) SR 422 15 (1) Highway Restoration, SR 422, Segment 16 10 to Segment 60, Pulaski Township 630,000 17 (Base Project Allocation - $ 630,000) 18 (2) Highway Restoration, SR 422, Segment 19 70 to Segment 120, Mahoning and Pulaski 20 Townships 630,000 21 (Base Project Allocation - $630,000) 22 (f) PA 60 23 (1) Construction of Millenium Park 24 Interchange to Provide Access to 25 Lawrence County Industrial Park, 26 Neshannock Township 210,000 27 (Base Project Allocation - $210,000) 28 Section 338. Lebanon County (Reserved). 29 Section 339. Lehigh County. 30 (a) SR 145 20060H2468B3600 - 22 -
1 (1) Congestion Reduction, South 4th Street 2 CCIP, City of Allentown 540,000 3 (Base Project Allocation - $400,000) 4 (Land Allocation - $40,000) 5 (Design and Contingencies - $100,000) 6 Section 340. Luzerne County. 7 (a) SR 315 8 (1) Signal Improvement, Laflin Road to Old 9 Boston Road, Laflin Borough to Jenkins 10 Township 1,040,000 11 (Base Project Allocation - $800,000) 12 (Land Allocation - $80,000) 13 (Design and Contingencies - $160,000) 14 (b) SR 415 15 (1) Intersection Improvements to Address 16 Congestion, Dallas Borough 1,920,000 17 (Base Project Allocation - $1,200,000) 18 (Land Allocation - $80,000) 19 (Design and Contingencies - $640,000) 20 (c) SR 424 21 (1) Extension of SR 424, Hazleton Beltway 22 to SR 924 11,600,000 23 (Base Project Allocation - $8,800,000) 24 (Land Allocation - $800,000) 25 (Design and Contingencies - $2,000,000) 26 Section 341. Lycoming County. 27 (a) Various 28 (1) Wetlands Monitoring, Various 29 Locations 100,000 30 (Base Project Allocation - $100,000) 20060H2468B3600 - 23 -
1 Section 342. McKean County. 2 (a) SR 219 3 (1) Restoration and Rehabilitation, Lewis 4 Run to Custer City, Lafayette and 5 Sergeant Townships 782,000 6 (Base Project Allocation - $700,000) 7 (Land Allocation - $2,000) 8 (Design and Contingencies - $80,000) 9 Section 343. Mercer County. 10 (a) Various 11 (1) Construct and Monitor Wetlands, 12 Countywide Wetland Banking, Various 13 Municipalities in Mercer County 130,000 14 (Base Project Allocation - $60,000) 15 (Land Allocation - $30,000) 16 (Design and Contingencies - $40,000) 17 (b) East Lake Road 18 (1) Road Relocation, East Lake Road, 19 Pymatuning Township 25,000 20 (Base Project Allocation - $25,000) 21 Section 344. Mifflin County. 22 (a) SR 22 23 (1) Restoration and Rehabilitation, Concrete 24 Rehabilitation, Lewistown Borough to Derry 25 Township 500,000 26 (Base Project Allocation - $400,000) 27 (Design and Contingencies - $100,000) 28 Section 345. Monroe County. 29 (a) SR 611 30 (1) Highway Reconstruction, Ramp 20060H2468B3600 - 24 -
1 Reconstruction, Bartonsville 2 Interchange HOP, Stroud Township 3,000,000 3 (Base Project Allocation - $3,000,000) 4 (2) Highway Intersection Improvements, 5 5 Point HOP, Mount Pocono Borough 500,000 6 (Base Project Allocation - $500,000) 7 Section 346. Montgomery County. 8 (a) SR 202 9 (1) Reconstruction and Widening, US 202, 10 Morris Road to PA 63, Montgomery, Upper 11 and Lower Gwynedd, Upper Dublin and 12 Whitpain Townships 32,700,000 13 (Base Project Allocation - $32,700,000) 14 (b) SR 309 15 (1) Integration, Cheltenham Avenue to PA 16 63 and the Link from PA 63 to US 202, 17 Cheltenham, Springfield, Upper Dublin 18 and Whitemarsh Townships 15,000,000 19 (Base Project Allocation - $15,000,000) 20 (c) SR 3051 21 (1) Widen Replacement Bridge, Old Betzwood 22 Pedestrian Trail, West Norriton 23 Township 800,000 24 (Base Project Allocation - $800,000) 25 (d) SR 4031 26 (1) Replacement of Signal Controller 27 equipment, Installation of Signal 28 Preemption Equipment, Pottstown Borough 29 and North Coventry Township 2,000,000 30 (Base Project Allocation - $2,000,000) 20060H2468B3600 - 25 -
1 (e) I-476, I-76 and PA 309 2 (1) Intelligent Transportation System 3 Deployment along I-476 Pennsylvania 4 Turnpike Northeast Extension, PA 309 5 and I-76 Schuylkill Expressway 800,000 6 (Base Project Allocation - $800,000) 7 (f) SR 1058 8 (1) Road Construction, SR 1058 Connector 9 Between PA 309 and Pennsylvania 10 Turnpike Northeast Extension 320,000 11 (Base Project Allocation - $320,000) 12 (g) Lafayette Street 13 (1) Street Extension and Interchange 14 Improvements, Lafayette Street 15 Extension 2,405,000 16 (Base Project Allocation - $2,405,000) 17 Section 347. Montour County (Reserved). 18 Section 348. Northampton County. 19 (a) SR 33 20 (1) Park and Ride Expansion for Intermodal 21 Services and Congestion Reduction, 22 Bethlehem Township 200,000 23 (Base Project Allocation - $125,000) 24 (Design and Contingencies - $75,000) 25 (b) SR 78 26 (1) Installation of Closed Circuit Cameras 27 for ITS CCTV Project Phase 1, Various 28 Municipalities 470,000 29 (Base Project Allocation - $470,000) 30 Section 349. Northumberland County (Reserved). 20060H2468B3600 - 26 -
1 Section 350. Perry County (Reserved). 2 Section 351. Philadelphia County. 3 (a) SR 676 4 (1) Rehabilitation, Reconstruction, 5 Operational Improvements, I-95 and Vine 6 Street Interchange, City of 7 Philadelphia 40,000,000 8 (Base Project Allocation - $40,000,000) 9 (b) SR 3013 10 (1) Installation of Gateway Treatment and 11 Landscaping, Planting in Median on 12 Island Avenue, City of Philadelphia 375,000 13 (Base Project Allocation - $375,000) 14 (c) SR 7301 15 (1) Removal of Sedgley Avenue Bridge, City 16 of Philadelphia 1,000,000 17 (Base Project Allocation - $1,000,000) 18 (d) South Philadelphia Access Road 19 (1) Design and Construction, Port Access 20 Road from South Philadelphia Port and 21 Intermodal Facilities, City of 22 Philadelphia 725,000 23 (Base Project Allocation - $725,000) 24 (e) Old Delaware Avenue 25 (1) Incorporate Portion of Old Delaware 26 Avenue as South Philadelphia Port 27 Access Road, City of Philadelphia 100,000 28 (Base Project Allocation - $100,000) 29 Section 352. Pike County (Reserved). 30 Section 353. Potter County. 20060H2468B3600 - 27 -
1 (a) SR 6 2 (1) Restoration and Rehabilitation of 3 Coudersport Area, Coudersport Borough 4 and Eulalia Township 252,000 5 (Base Project Allocation - $125,000) 6 (Land Allocation - $2,000) 7 (Design and Contingencies - $125,000) 8 Section 354. Schuylkill County (Reserved). 9 Section 355. Snyder County (Reserved). 10 Section 356. Somerset County (Reserved). 11 Section 357. Sullivan County (Reserved). 12 Section 358. Susquehanna County. 13 (a) SR 11 and SR 171 14 (1) Corridor Improvements of SR 11 and SR 15 171, Great Bend Township 3,600,000 16 (Base Project Allocation - $3,200,000) 17 (Land Allocation - $80,000) 18 (Design and Contingencies - $320,000) 19 Section 359. Tioga County. 20 (a) SR 15 and SR 6015 21 (1) Wetlands Monitoring Analysis, 22 Approximately 2.6 Miles, North of 23 Blossburg Borough, Covington Township 180,000 24 (Base Project Allocation - $180,000) 25 Section 360. Union County (Reserved). 26 Section 361. Venango County (Reserved). 27 Section 362. Warren County (Reserved). 28 Section 363. Washington County. 29 (a) SR 40 30 (1) Add Lane, US 40, I-70 to PA 18, City 20060H2468B3600 - 28 -
1 of Washington 660,000 2 (Base Project Allocation - $400,000) 3 (Land Allocation - $150,000) 4 (Design and Contingencies - $110,000) 5 (b) SR 70 6 (1) New Interchange, Bentleyville 7 Interchange, Bentleyville Borough 3,950,000 8 (Base Project Allocation - $3,000,000) 9 (Land Allocation - $700,000) 10 (Design and Contingencies - $250,000) 11 (2) Addition of Lane, Restoration, I-70 12 from I-79 South to I-79 North, South 13 Strabane Township 2,900,000 14 (Base Project Allocation - $2,500,000) 15 (Land Allocation - $200,000) 16 (Design and Contingencies - $200,000) 17 (c) SR 88 18 (1) Addition of a Turning Lane and a 19 Traffic Signal, Intersection of SR 88 20 and SR 837, New Eagle Borough 1,600,000 21 (Base Project Allocation - $900,000) 22 (Land Allocation - $200,000) 23 (Design and Contingencies - $500,000) 24 Section 364. Wayne County (Reserved). 25 Section 365. Westmoreland County. 26 (a) SR 0 27 (1) New Roadway, Congestion Reduction, 28 Jeannette Truck Route, City of 29 Jeannette 864,000 30 (Base Project Allocation - $750,000) 20060H2468B3600 - 29 -
1 (Land Allocation - $30,000) 2 (Design and Contingencies - $84,000) 3 (b) SR 30 4 (1) Corridor Safety, Congestion Reduction, 5 US 30 Corridor Safety Improvements, 6 Irwin Borough, Hempfield and North 7 Huntingdon Townships 3,130,000 8 (Base Project Allocation - $3,000,000) 9 (Land Allocation - $30,000) 10 (Design and Contingencies - $100,000) 11 (c) SR 31 12 (1) Intersection Improvements, SR 31 at 13 Braddock Avenue, Mt. Pleasant Borough 550,000 14 (Base Project Allocation - $200,000) 15 (Land Allocation - $150,000) 16 (Design and Contingencies - $200,000) 17 (d) SR 66 18 (1) Intersection and Approaches Signal 19 Improvements and Additional Lane, SR 20 66, Beaver Run Road, Washington 21 Township 910,000 22 (Base Project Allocation - $160,000) 23 (Land Allocation - $225,000) 24 (Design and Contingencies - $525,000) 25 (e) SR 982 26 (1) Signal Enhancements and Miscellaneous 27 Roadway Work, Westmoreland County, 28 Traffic Signal Enhancements, Various 29 Municipalities 667,000 30 (Base Project Allocation - $480,000) 20060H2468B3600 - 30 -
1 (Land Allocation - $125,000) 2 (Design and Contingencies - $62,000) 3 (f) SR 1053 4 (1) Widen and Restoration of Georges 5 Station Road, Hempfield Township 1,150,000 6 (Base Project Allocation - $200,000) 7 (Land Allocation - $500,000) 8 (Design and Contingencies - $450,000) 9 (g) SR 3011 10 (1) Intersection, Safety and Drainage 11 Improvements, SR 3011, Finley Road, 12 Rostraver Township 370,000 13 (Base Project Allocation - $300,000) 14 (Land Allocation - $70,000) 15 Section 366. Wyoming County (Reserved). 16 Section 367. York County. 17 (a) Concord Road 18 (1) Road Extension, Concord Road, 19 Springettsbury Township 125,000 20 (Base Project Allocation - $125,000) 21 (b) Intermodal Facility 22 (1) Design and Construct Access to 23 Intermodal Facility Track, Five New 24 Lines and Switches, Three New Bridges 400,000 25 (Base Project Allocation - $400,000) 26 Section 368. Statewide projects. 27 (a) Crawford, Forest, Venango and Warren 28 Counties 29 (1) Construction and Monitoring of 30 Wetlands, Countywide Wetland Banking, 20060H2468B3600 - 31 -
1 Various Municipalities 130,000 2 (Base Project Allocation - $60,000) 3 (Land Allocation - $30,000) 4 (Design and Contingencies - $40,000) 5 CHAPTER 5 6 (RESERVED) 7 CHAPTER 7 8 MISCELLANEOUS PROVISIONS 9 Section 701. Federal funds. 10 All moneys received from the Federal Government for the 11 construction of the projects specifically itemized in this act 12 are also hereby appropriated for those projects. 13 Section 702. Allocation of funds. 14 Whenever as determined by the Department of Transportation 15 that the full estimated financial costs of the projects itemized 16 in this act are not necessary for the proper design, acquisition 17 or construction of such projects, the excess funds no longer 18 required may be allocated by the Department of Transportation to 19 increase the estimated costs of any one or more of the projects 20 specifically itemized in a capital budget. 21 Section 703. Estimated useful life. 22 The General Assembly states that the estimated useful life of 23 the highway capital projects itemized in this act is 30 years. 24 Section 704. Effective date. 25 This act shall take effect immediately. B13L86BIL/20060H2468B3600 - 32 -