                                                      PRINTER'S NO. 2938

THE GENERAL ASSEMBLY OF PENNSYLVANIA


HOUSE BILL

No. 2167 Session of 2003


        INTRODUCED BY McCALL, ALLEN, BALDWIN, BEBKO-JONES, BUNT, CAUSER,
           COY, DERMODY, DeWEESE, D. EVANS, FABRIZIO, FAIRCHILD,
           FICHTER, GABIG, GEIST, GEORGE, GODSHALL, GOODMAN, GORDNER,
           GRUCELA, HALUSKA, HARHAI, HERMAN, HERSHEY, HORSEY, KOTIK,
           LaGROTTA, LAUGHLIN, MARKOSEK, McILHATTAN, MELIO, PALLONE,
           PRESTON, SAYLOR, SHANER, SOLOBAY, TIGUE, YOUNGBLOOD AND
           YUDICHAK, NOVEMBER 18, 2003

        REFERRED TO COMMITTEE ON APPROPRIATIONS, NOVEMBER 18, 2003

                                  A SUPPLEMENT

     1  To the act of December 8, 1982 (P.L.848, No.235), entitled "An
     2     act providing for the adoption of capital projects related to
     3     the repair, rehabilitation or replacement of highway bridges
     4     to be financed from current revenue or by the incurring of
     5     debt and capital projects related to highway and safety
     6     improvement projects to be financed from current revenue of
     7     the Motor License Fund," itemizing additional local and State
     8     bridge projects.

     9     The General Assembly of the Commonwealth of Pennsylvania
    10  hereby enacts as follows:
    11  Section 1.  Short title.
    12     This act shall be known and may be cited as the Highway-
    13  Railroad and Highway Bridge Capital Budget Supplemental Act for
    14  2003-2004.
    15  Section 2.  Definitions.
    16     The following words and phrases when used in this act shall
    17  have the meanings given to them in this section unless the
    18  context clearly indicates otherwise:


     1     "Account."  The Highway Bridge Improvement Restricted Account
     2  within the Motor License Fund.
     3     "Capital project."  A capital project as defined in section
     4  302 of the act of February 9, 1999 (P.L.1, No.1), known as the
     5  Capital Facilities Debt Enabling Act, and shall include a county
     6  or municipal bridge rehabilitation, replacement or improvement
     7  project as set forth in this act.
     8     "Department."  The Department of Transportation of the
     9  Commonwealth.
    10     "Secretary."  The Secretary of Transportation of the
    11  Commonwealth.
    12  Section 3.  Total authorization for bridge projects.
    13     (a)  Total projects.--The total authorization for the costs
    14  of the projects itemized pursuant to this act and to be financed
    15  from current revenue or by the incurring of debt shall be
    16  $00,000,000.
    17     (b)  State projects.--The authorization for capital projects
    18  in the category of highway bridge projects and forestry and
    19  State park bridge projects to be constructed by the Department
    20  of Transportation, its successors or assigns, and to be financed
    21  by the incurring of debt or from the account, itemized in this
    22  act under the category of State bridges, shall be $00,000,000.
    23     (c)  Non-State projects.--The authorization for non-State
    24  highway bridge projects to be constructed by municipalities and
    25  to be financed in part with grants not exceeding 80% of the non-
    26  Federal share of the costs made to the local government
    27  municipalities by the department from revenues deposited in the
    28  account itemized in this act under the category of local
    29  bridges, shall be $0,000,000.
    30  Section 4.  Itemization of bridge projects.
    20030H2167B2938                  - 2 -     

     1     The individual capital projects in the category of highway
     2  projects to be constructed by the Department of Transportation,
     3  its successors or assigns, and to be financed from current
     4  revenue or by the incurring of debt are hereby itemized,
     5  together with their estimated financial costs, in the following
     6  sections.
     7  Section 5.  Adams County.
     8     (a)  Local Bridges
     9         (1)  Germany Township, Feeser Road over
    10             Alloway Creek, Bridge Replacement             229,000
    11             (Base Construction Allocation -
    12             $181,000)
    13             (Land Allocation - $8,000)
    14             (Design and Contingencies - $40,000)
    15     (b)  State Bridges
    16         (1)  SR 0116 over Rock Creek, Straban
    17             Township and Gettysburg Borough, Bridge
    18             Replacement                                 1,575,000
    19             (Base Construction Allocation -
    20             $1,035,000)
    21             (Land Allocation - $40,000)
    22             (Design and Contingencies - $500,000)
    23         (2)  SR 0116 over White Run, Mt. Pleasant
    24             Township, Bridge Replacement                1,115,000
    25             (Base Construction Allocation -
    26             $590,000)
    27             (Land Allocation - $25,000)
    28             (Design and Contingencies - $500,000)
    29         (3)  SR 3001 over Conewago Creek, Butler
    30             and Tyrone Townships, Bridge
    20030H2167B2938                  - 3 -     

     1             Replacement                                 1,450,000
     2             (Base Construction Allocation -
     3             $920,000)
     4             (Land Allocation - $30,000)
     5             (Design and Contingencies - $500,000)
     6  Section 6.  Allegheny County.
     7     (a)  Local Bridges
     8         (1)  Dravosburg Borough, Mansfield Bridge
     9             over Monongahela River, Bridge
    10             Rehabilitation                             10,850,000
    11             (Base Construction Allocation -
    12             $9,000,000)
    13             (Land Allocation - $100,000)
    14             (Design and Contingencies - $1,750,000)
    15         (2)  Kennedy Township, Forrest Grove over
    16             I-79, Bridge Rehabilitation                 4,180,000
    17             (Base Construction Allocation -
    18             $3,800,000)
    19             (Design and Contingencies - $380,000)
    20     (b)  State Bridges
    21         (1)  SR 0837, Glenwood Bridge Ramps, City
    22             of Pittsburgh and West Homestead
    23             Borough, Bridge Rehabilitation             11,280,000
    24             (Base Construction Allocation -
    25             $9,580,000)
    26             (Land Allocation - $150,000)
    27             (Design and Contingencies - $1,550,000)
    28         (2)  SR 0065 over Chateau Street, City of
    29             Pittsburgh, Bridge Replacement             13,784,000
    30             (Base Construction Allocation -
    20030H2167B2938                  - 4 -     

     1             $12,784,000)
     2             (Design and Contingencies - $1,000,000)
     3         (3)  SR 8043, Beaver Avenue over Chateau
     4             Street, City of Pittsburgh, Bridge
     5             Rehabilitation                              2,430,000
     6             (Base Construction Allocation -
     7             $2,100,000)
     8             (Land Allocation - $50,000)
     9             (Design and Contingencies - $280,000)
    10         (4)  SR 3013 over Piney Fork Creek, South
    11             Park Township, Bridge Replacement         100,250,000
    12             (Base Construction Allocation -
    13             $100,000,000)
    14             (Design and Contingencies - $250,000)
    15         (5)  SR 2082, Hulton Road over Allegheny
    16             River, Oakmont Borough and Harmar
    17             Township, Bridge Replacement                  784,000
    18             (Base Construction Allocation -
    19             $500,000)
    20             (Design and Contingencies - $284,000)
    21  Section 7.  Armstrong County (Reserved).
    22  Section 8.  Beaver County (Reserved).
    23  Section 9.  Bedford County.
    24     (a)  Local Bridges (Reserved)
    25     (b)  State Bridges
    26         (1)  SR 0096 over Wills Creek, Hyndman
    27             Borough, Bridge Replacement                 1,385,000
    28             (Base Construction Allocation -
    29             $1,075,000)
    30             (Land Allocation - $110,000)
    20030H2167B2938                  - 5 -     

     1             (Design and Contingencies - $200,000)
     2  Section 10.  Berks County.
     3     (a)  Local Bridges (Reserved)
     4     (b)  State Bridges
     5         (1)  SR 3061 over Tulpehocken Creek, Marion
     6             Township, Bridge Replacement                2,150,000
     7             (Base Construction Allocation -
     8             $1,500,000)
     9             (Land Allocation - $150,000)
    10             (Design and Contingencies - $500,000)
    11  Section 11.  Blair County.
    12     (a)  Local Bridges (Reserved)
    13     (b)  State Bridges
    14         (1)  US 22 over Blair Gap Run, Duncansville
    15             Borough, Bridge Replacement                 2,320,000
    16             (Base Construction Allocation -
    17             $1,500,000)
    18             (Land Allocation - $200,000)
    19             (Design and Contingencies - $620,000)
    20         (2)  SR 2005 over Clover Creek, North
    21             Woodbury Township, Bridge Replacement         485,000
    22             (Base Construction Allocation -
    23             $350,000)
    24             (Land Allocation - $25,000)
    25             (Design and Contingencies - $110,000)
    26  Section 12.  Bradford County.
    27     (a)  Local Bridges (Reserved)
    28     (b)  State Bridges
    29         (1)  SR 1027 over Wysox Creek, Wysox
    30             Township, Bridge Removal                      150,000
    20030H2167B2938                  - 6 -     

     1             (Base Construction Allocation -
     2             $100,000)
     3             (Land Allocation - $5,000)
     4             (Design and Contingencies - $45,000)
     5  Section 13.  Bucks County.
     6     (a)  Local Bridges (Reserved)
     7     (b)  State Bridges
     8         (1)  SR 4047, Richlandtown Road over
     9             Tohicken Creek, East Rockhill and
    10             Haycock Townships, Bridge
    11             Rehabilitation                                858,000
    12             (Base Construction Allocation -
    13             $660,000)
    14             (Land Allocation - $40,000)
    15             (Design and Contingencies - $158,000)
    16         (2)  SR 0417, Hellertown Road over Branch
    17             of Cooks Creek, Springfield Township,
    18             Bridge Replacement                          1,165,000
    19             (Base Construction Allocation -
    20             $750,000)
    21             (Land Allocation - $40,000)
    22             (Design and Contingencies - $375,000)
    23         (3)  SR 4019, Minsi Trail over Branch of
    24             Morris Run, Hilltown Township, Bridge
    25             Replacement                                   841,000
    26             (Base Construction Allocation -
    27             $403,000)
    28             (Land Allocation - $90,000)
    29             (Design and Contingencies - $348,000)
    30         (4)  SR 4019, Minsi Trail No.II over Branch
    20030H2167B2938                  - 7 -     

     1             of Morris Run, Hilltown Township,
     2             Bridge Replacement                            811,000
     3             (Base Construction Allocation -
     4             $403,000)
     5             (Land Allocation - $90,000)
     6             (Design and Contingencies - $318,000)
     7         (5)  SR 4001, New Galena Road over Walters
     8             Run, New Britain Township, Bridge
     9             Replacement                                   765,000
    10             (Base Construction Allocation -
    11             $460,000)
    12             (Land Allocation - $30,000)
    13             (Design and Contingencies - $275,000)
    14         (6)  SR 2036 over Branch of Neshaminy
    15             Creek, Newtown Township, Bridge
    16             Replacement                                 2,818,000
    17             (Base Construction Allocation -
    18             $1,850,000)
    19             (Design and Contingencies - $968,000)
    20         (7)  SR 1003, Aquetong Road over Aquetong
    21             Creek, Solebury Township, Bridge
    22             Replacement                                 1,365,000
    23             (Base Construction Allocation -
    24             $700,000)
    25             (Land Allocation - $90,000)
    26             (Design and Contingencies - $575,000)
    27  Section 14.  Butler County.
    28     (a)  Local Bridges (Reserved)
    29     (b)  State Bridges
    30         (1)  SR 2008, Mushroom Farm Road over Long
    20030H2167B2938                  - 8 -     

     1             Run, Winfield Township, Bridge
     2             Rehabilitation                                345,000
     3             (Base Construction Allocation -
     4             $285,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $50,000)
     7         (2)  I-79 Southbound over PA 68, Jackson
     8             Township, Bridge Replacement                  610,000
     9             (Base Construction Allocation -
    10             $550,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $50,000)
    13  Section 15.  Cambria County.
    14     (a)  Local Bridges
    15         (1)  Lilly Borough, Railroad Street over
    16             Bear Run, Bridge Replacement                  163,000
    17             (Base Construction Allocation -
    18             $163,000)
    19         (2)  Middle Taylor Township, T-338 over
    20             Kepple Run, Bridge Replacement                150,000
    21             (Base Construction Allocation -
    22             $150,000)
    23         (3)  Adams Township, T-609, Maryland Avenue
    24             over Unnamed Stream, Bridge
    25             Replacement                                   200,000
    26             (Base Construction Allocation -
    27             $200,000)
    28         (4)  East Carroll Township, T-527 over
    29             Little Chest Creek, Bridge Replacement      1,017,000
    30             (Base Construction Allocation -
    20030H2167B2938                  - 9 -     

     1             $600,000)
     2             (Land Allocation - $35,000)
     3             (Design and Contingencies - $382,000)
     4     (b)  State Bridges
     5         (1)  SR 2012 over Bens Creek, Washington
     6             Township, Bridge Replacement                  785,000
     7             (Base Construction Allocation -
     8             $550,000)
     9             (Land Allocation - $85,000)
    10             (Design and Contingencies - $150,000)
    11  Section 16.  Cameron County.
    12     (a)  Local Bridges (Reserved)
    13     (b)  State Bridges
    14         (1)  SR 0555 over Sinnemahoning Creek,
    15             Driftwood Borough, Bridge Replacement       4,865,000
    16             (Base Construction Allocation -
    17             $4,000,000)
    18             (Land Allocation - $150,000)
    19             (Design and Contingencies - $715,000)
    20         (2)  SR 0120 over Portage Creek, Shippen
    21             Township and Emporium Borough, Bridge
    22             Replacement                                 1,630,000
    23             (Base Construction Allocation -
    24             $1,490,000)
    25             (Land Allocation - $30,000)
    26             (Design and Contingencies - $110,000)
    27         (3)  SR 0555 over Hick's Run, Gibson
    28             Township, Bridge Replacement                  680,000
    29             (Base Construction Allocation -
    30             $560,000)
    20030H2167B2938                 - 10 -     

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $100,000)
     3         (4)  SR 0120 over Grove Run, Gibson
     4             Township, Bridge Replacement                  650,000
     5             (Base Construction Allocation -
     6             $450,000)
     7             (Land Allocation - $100,000)
     8             (Design and Contingencies - $100,000)
     9         (5)  SR 2001 over Laurel Branch, Gibson
    10             Township, Bridge Replacement                  730,000
    11             (Base Construction Allocation -
    12             $440,000)
    13             (Land Allocation - $5,000)
    14             (Design and Contingencies - $285,000)
    15  Section 17.  Carbon County (Reserved).
    16  Section 18.  Centre County.
    17     (a)  Local Bridges (Reserved)
    18     (b)  State Bridges
    19         (1)  SR 0504 over Black Moshannon Creek,
    20             Rush Township, Bridge Replacement             802,000
    21             (Base Construction Allocation -
    22             $750,000)
    23             (Land Allocation - $42,000)
    24             (Design and Contingencies - $10,000)
    25         (2)  SR 2008 over Penns Creek, Gregg
    26             Township, Bridge Replacement                1,819,000
    27             (Base Construction Allocation -
    28             $1,300,000)
    29             (Land Allocation - $44,000)
    30             (Design and Contingencies - $475,000)
    20030H2167B2938                 - 11 -     

     1         (3)  SR 3006 over Buffalo Run, Benner
     2             Township, Bridge Replacement                1,170,000
     3             (Base Construction Allocation -
     4             $750,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $400,000)
     7         (4)  SR 3023 over Laurel Run, Worth
     8             Township, Bridge Replacement                  420,000
     9             (Base Construction Allocation -
    10             $300,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $100,000)
    13         (5)  SR 2012 over Penns Creek, Gregg
    14             Township, Bridge Replacement                  670,000
    15             (Base Construction Allocation -
    16             $500,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $150,000)
    19         (6)  SR 2012 over Muddy Creek, Gregg
    20             Township, Bridge Replacement                  670,000
    21             (Base Construction Allocation -
    22             $500,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $150,000)
    25         (7)  SR 4002 over Cherry Run, Snow Shoe
    26             Township, Bridge Replacement                  705,000
    27             (Base Construction Allocation -
    28             $480,000)
    29             (Land Allocation - $50,000)
    30             (Design and Contingencies - $175,000)
    20030H2167B2938                 - 12 -     

     1         (8)  SR 4004 over McCormick Run, Union
     2             Township, Bridge Replacement                  665,000
     3             (Base Construction Allocation -
     4             $400,000)
     5             (Land Allocation - $45,000)
     6             (Design and Contingencies - $220,000)
     7  Section 19.  Chester County.
     8     (a)  Local Bridges
     9         (1)  Downingtown Borough, Chestnut Street
    10             Bridge over Railroad, Bridge
    11             Replacement                                 3,500,000
    12             (Base Construction Allocation -
    13             $2,500,000)
    14             (Land Allocation - $1,000,000)
    15     (b)  State Bridges
    16         (1)  SR 2007, Westtown Road over East
    17             Branch of Chester Creek, Thornbury and
    18             Westtown Townships, Bridge Replacement      3,600,000
    19             (Base Construction Allocation -
    20             $2,500,000)
    21             (Design and Contingencies - $1,100,000)
    22         (2)  SR 4021, Springton Road over Branch of
    23             Indian Run, Wallace Township, Bridge
    24             Replacement                                   734,000
    25             (Base Construction Allocation -
    26             $450,000)
    27             (Land Allocation - $110,000)
    28             (Design and Contingencies - $174,000)
    29         (3)  SR 3049, Green Valley Road over West
    30             Branch of Brandywine Creek, Newlin
    20030H2167B2938                 - 13 -     

     1             Township, Bridge Replacement                  728,000
     2             (Base Construction Allocation -
     3             $345,000)
     4             (Land Allocation - $40,000)
     5             (Design and Contingencies - $343,000)
     6         (4)  SR 3049, Brandywine Creek Road over
     7             West Branch of Brandywine Creek, Newlin
     8             Township, Bridge Replacement                1,375,000
     9             (Base Construction Allocation -
    10             $575,000)
    11             (Land Allocation - $40,000)
    12             (Design and Contingencies - $760,000)
    13         (5)  SR 4012, Suplee Road over West Branch
    14             of Brandywine Creek, Honeybrook
    15             Township, Bridge Replacement                  995,000
    16             (Base Construction Allocation -
    17             $575,000)
    18             (Land Allocation - $40,000)
    19             (Design and Contingencies - $380,000)
    20  Section 20.  Clarion County (Reserved).
    21  Section 21.  Clearfield County.
    22     (a)  Local Bridges
    23         (1)  Union Township, T-372 over Clearfield
    24             & Mahoning Railway Company, near
    25             Rockton, Bridge Removal                       291,000
    26             (Base Construction Allocation -
    27             $225,000)
    28             (Land Allocation - $5,000)
    29             (Design and Contingencies - $61,000)
    30     (b)  State Bridges
    20030H2167B2938                 - 14 -     

     1         (1)  SR 3005 over Susquehanna River,
     2             Greenwood Township, Bridge Replacement      3,150,000
     3             (Base Construction Allocation -
     4             $2,550,000)
     5             (Land Allocation - $50,000)
     6             (Design and Contingencies - $550,000)
     7         (2)  SR 4016 over Branch of Laborde, Sandy
     8             Township, Bridge Replacement                  964,000
     9             (Base Construction Allocation -
    10             $725,000)
    11             (Land Allocation - $34,000)
    12             (Design and Contingencies - $205,000)
    13         (3)  PA 453 over Potts Run, Knox Township,
    14             Bridge Replacement                            520,000
    15             (Base Construction Allocation -
    16             $400,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $100,000)
    19         (4)  SR 2014 over Coal Run, Decatur
    20             Township, Bridge Replacement                1,003,000
    21             (Base Construction Allocation -
    22             $900,000)
    23             (Land Allocation - $35,000)
    24             (Design and Contingencies - $68,000)
    25         (5)  SR 4019 over Sandy Lick Creek, City of
    26             Dubois, Bridge Replacement                  2,675,000
    27             (Base Construction Allocation -
    28             $1,850,000)
    29             (Land Allocation - $100,000)
    30             (Design and Contingencies - $725,000)
    20030H2167B2938                 - 15 -     

     1  Section 22.  Clinton County.
     2     (a)  Local Bridges (Reserved)
     3     (b)  State Bridges
     4         (1)  SR 2015 over Fishing Creek, Bald Eagle
     5             Township, Bridge Replacement                1,735,000
     6             (Base Construction Allocation -
     7             $1,120,000)
     8             (Land Allocation - $70,000)
     9             (Design and Contingencies - $545,000)
    10         (2)  SR 0477 over Long Run, Lamar Township,
    11             Bridge Replacement                          1,120,000
    12             (Base Construction Allocation -
    13             $700,000)
    14             (Land Allocation - $60,000)
    15             (Design and Contingencies - $360,000)
    16         (3)  SR 1008 over Little Plum Run,
    17             Dunnstable Township, Bridge
    18             Replacement                                   835,000
    19             (Base Construction Allocation -
    20             $600,000)
    21             (Land Allocation - $50,000)
    22             (Design and Contingencies - $185,000)
    23         (4)  SR 4005 over Young Womans Creek,
    24             Chapman Township, Bridge Replacement          560,000
    25             (Base Construction Allocation -
    26             $300,000)
    27             (Land Allocation - $50,000)
    28             (Design and Contingencies - $210,000)
    29  Section 23.  Columbia County.
    30     (a)  Local Bridges (Reserved)
    20030H2167B2938                 - 16 -     

     1     (b)  State Bridges
     2         (1)  SR 0093 over North Branch of Briar
     3             Creek, North Centre Township, Bridge
     4             Replacement                                   537,000
     5             (Base Construction Allocation -
     6             $500,000)
     7             (Land Allocation - $5,000)
     8             (Design and Contingencies - $32,000)
     9  Section 24.  Crawford County.
    10     (a)  Local Bridges
    11         (1)  Athens Township, T-776, Eddies Bridge
    12             over Muddy Creek, Bridge Replacement          705,000
    13             (Base Construction Allocation -
    14             $700,000)
    15             (Land Allocation - $5,000)
    16         (2)  Sparta Township, T-869, Blakeslee Road
    17             over Oil Creek, Bridge Replacement            350,000
    18             (Base Construction Allocation -
    19             $300,000)
    20             (Land Allocation - $50,000)
    21         (3)  City of Meadville, Hollister Street
    22             over Mill Run, Bridge Replacement             151,000
    23             (Base Construction Allocation -
    24             $144,000)
    25             (Land Allocation - $7,000)
    26         (4)  Summerhill Township, T-406, Smith Road
    27             over Conneaut Creek, Bridge
    28             Replacement                                   605,000
    29             (Base Construction Allocation -
    30             $600,000)
    20030H2167B2938                 - 17 -     

     1             (Land Allocation - $5,000)
     2         (5)  Woodcock Township, T-600, Craig Road
     3             over Woodcock Creek, Bridge
     4             Replacement                                   455,000
     5             (Base Construction Allocation -
     6             $450,000)
     7             (Land Allocation - $5,000)
     8         (6)  Woodcock Township, T-595 over
     9             Tributary of French Creek, Bridge
    10             Replacement                                   170,000
    11             (Base Construction Allocation -
    12             $170,000)
    13         (7)  Woodcock Township, Amy Road over
    14             Gravel Run, Bridge Replacement                210,000
    15             (Base Construction Allocation -
    16             $210,000)
    17         (8)  Cussewago Township, T-841, Center Road
    18             over Cussewago Creek, Bridge
    19             Replacement                                   262,000
    20             (Base Construction Allocation -
    21             $255,000)
    22             (Land Allocation - $7,000)
    23         (9)  Fairfield and Union Townships, T-620,
    24             Stopp Road over Conneaut Outlet, Bridge
    25             Replacement                                   380,000
    26             (Base Construction Allocation -
    27             $370,000)
    28             (Land Allocation - $10,000)
    29         (10)  Fairfield and Union Townships, T-574,
    30             Hart Road over Conneaut Creek, Bridge
    20030H2167B2938                 - 18 -     

     1             Replacement                                   368,000
     2             (Base Construction Allocation -
     3             $362,000)
     4             (Land Allocation - $6,000)
     5         (11)  Spring Township, T-749, King Road
     6             over Tributary of Carr Run, Bridge
     7             Replacement                                   420,000
     8             (Base Construction Allocation -
     9             $420,000)
    10     (b)  State Bridges
    11         (1)  SR 0099 over Torry Run, Venango
    12             Township, Bridge Rehabilitation               650,000
    13             (Base Construction Allocation -
    14             $400,000)
    15             (Land Allocation - $50,000)
    16             (Design and Contingencies - $200,000)
    17         (2)  SR 0285 over Smock Run, Greenwood
    18             Township, Bridge Replacement                  600,000
    19             (Base Construction Allocation -
    20             $400,000)
    21             (Land Allocation - $50,000)
    22             (Design and Contingencies - $150,000)
    23         (3)  SR 0018 over Conneaut Creek, Summit
    24             Township, Bridge Rehabilitation               120,000
    25             (Base Construction Allocation -
    26             $80,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $30,000)
    29         (4)  SR 0018 over Branch of Inlet Creek,
    30             Summit Township, Bridge Rehabilitation        120,000
    20030H2167B2938                 - 19 -     

     1             (Base Construction Allocation -
     2             $80,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $30,000)
     5         (5)  SR 0089 over Penn Central Railroad,
     6             Sparta Township, Bridge Removal               310,000
     7             (Base Construction Allocation -
     8             $300,000)
     9             (Land Allocation - $10,000)
    10         (6)  SR 1002 over French Creek, Venango
    11             Borough and Cambridge Township, Bridge
    12             Replacement                                 2,850,000
    13             (Base Construction Allocation -
    14             $2,750,000)
    15             (Land Allocation - $100,000)
    16         (7)  SR 2003, Mercer Pike over Conneaut
    17             Creek, Union Township, Bridge
    18             Replacement                                   550,000
    19             (Base Construction Allocation -
    20             $520,000)
    21             (Land Allocation - $30,000)
    22  Section 25.  Cumberland County.
    23     (a)  Local Bridges
    24         (1)  Hopewell Township, T-374, Ramp Bridge
    25             over Conodoquinet Creek, Bridge
    26             Replacement                                   518,000
    27             (Base Construction Allocation -
    28             $464,000)
    29             (Land Allocation - $8,000)
    30             (Design and Contingencies - $46,000)
    20030H2167B2938                 - 20 -     

     1         (2)  Dickinson Township, Moore's Mill Road
     2             over Yellow Breeches Creek, Bridge
     3             Replacement                                   288,000
     4             (Base Construction Allocation -
     5             $240,000)
     6             (Land Allocation - $8,000)
     7             (Design and Contingencies - $40,000)
     8     (b)  State Bridges
     9         (1)  SR 3007 over Big Spring Run, North
    10             Newton and West Pennsboro Townships,
    11             Bridge Replacement                            980,000
    12             (Base Construction Allocation -
    13             $460,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $500,000)
    16         (2)  Conrail Railroad over SR 3007,
    17             Newville Borough, Bridge Removal              215,000
    18             (Base Construction Allocation -
    19             $165,000)
    20             (Land Allocation - $25,000)
    21             (Design and Contingencies - $25,000)
    22  Section 26.  Dauphin County.
    23     (a)  Local Bridges
    24         (1)  City of Harrisburg, Calder Street over
    25             Paxton Creek, Bridge Replacement              225,000
    26             (Base Construction Allocation -
    27             $165,000)
    28             (Land Allocation - $20,000)
    29             (Design and Contingencies - $40,000)
    30         (2)  Halifax Township, T-356, Konick Road
    20030H2167B2938                 - 21 -     

     1             over Powell Creek, Bridge Replacement         333,000
     2             (Base Construction Allocation -
     3             $285,000)
     4             (Land Allocation - $8,000)
     5             (Design and Contingencies - $40,000)
     6         (3)  Derry Township, T-594, Lingle Road
     7             over Conrail, Bridge Replacement              494,000
     8             (Base Construction Allocation -
     9             $422,000)
    10             (Land Allocation - $30,000)
    11             (Design and Contingencies - $42,000)
    12     (b)  State Bridges
    13         (1)  SR 0039 over US 22 and Railroad,
    14             Susquehanna Township, Bridge
    15             Rehabilitation                              2,516,000
    16             (Base Construction Allocation -
    17             $2,126,000)
    18             (Land Allocation - $50,000)
    19             (Design and Contingencies - $340,000)
    20         (2)  SR 0441 over Swatara Creek, Royalton
    21             Borough, Bridge Rehabilitation              1,220,000
    22             (Base Construction Allocation -
    23             $1,000,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $200,000)
    26         (3)  I-81 over Susquehanna River,
    27             Susquehanna Township, Bridge
    28             Rehabilitation                              6,500,000
    29             (Base Construction Allocation -
    30             $5,000,000)
    20030H2167B2938                 - 22 -     

     1             (Design and Contingencies - $1,500,000)
     2         (4)  I-83 over Susquehanna River, City of
     3             Harrisburg, Bridge Rehabilitation           6,500,000
     4             (Base Construction Allocation -
     5             $5,000,000)
     6             (Design and Contingencies - $1,500,000)
     7  Section 27.  Delaware County.
     8     (a)  Local Bridges
     9         (1)  Media Borough, Third Street over
    10             Broomall Lake Dam, Bridge
    11             Rehabilitation                              1,200,000
    12             (Base Construction Allocation -
    13             $1,000,000)
    14             (Design and Contingencies - $200,000)
    15     (b)  State Bridges
    16         (1)  SR 3017, Bethel Road over Branch of
    17             Naamans Creek, Upper Chichester
    18             Township, Bridge Replacement                1,115,000
    19             (Base Construction Allocation -
    20             $595,000)
    21             (Land Allocation - $220,000)
    22             (Design and Contingencies - $300,000)
    23  Section 28.  Elk County.
    24     (a)  Local Bridges (Reserved)
    25     (b)  State Bridges
    26         (1)  SR 1006 over West Branch of Clarion
    27             River, Jones Township, Bridge
    28             Replacement                                   970,000
    29             (Base Construction Allocation -
    30             $800,000)
    20030H2167B2938                 - 23 -     

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $150,000)
     3  Section 29.  Erie County.
     4     (a)  Local Bridges
     5         (1)  Conneaut Township, T-301, Boyce Road
     6             over Stone Run, Bridge Replacement            368,000
     7             (Base Construction Allocation -
     8             $337,000)
     9             (Land Allocation - $6,000)
    10             (Design and Contingencies - $25,000)
    11         (2)  Washington Township, T-580, Perry Lane
    12             over Conneauttee Creek, Bridge
    13             Replacement                                   252,000
    14             (Base Construction Allocation -
    15             $246,000)
    16             (Land Allocation - $6,000)
    17         (3)  City of Corry, Shady Avenue over Hare
    18             Creek, Bridge Replacement                     164,000
    19             (Base Construction Allocation -
    20             $144,000)
    21             (Land Allocation - $20,000)
    22         (4)  Conneaut Township, T-883, Akerley Road
    23             over Astabula Creek, Bridge
    24             Replacement                                   218,000
    25             (Base Construction Allocation -
    26             $210,000)
    27             (Land Allocation - $8,000)
    28         (5)  Concord Township, T-387, Mitchell Road
    29             over Lilley Run, Bridge Replacement           141,000
    30             (Base Construction Allocation -
    20030H2167B2938                 - 24 -     

     1             $135,000)
     2             (Land Allocation - $6,000)
     3         (6)  Washington Township, T-518, Benson
     4             Road over Conneauttee Creek, Bridge
     5             Replacement                                   272,000
     6             (Base Construction Allocation -
     7             $266,000)
     8             (Land Allocation - $6,000)
     9         (7)  City of Erie, State Street over
    10             Conrail Railroad, Bridge Replacement          130,000
    11             (Base Construction Allocation -
    12             $120,000)
    13             (Land Allocation - $10,000)
    14         (8)  North East Township, Bort Road over
    15             Conrail Railroad, Bridge Replacement          604,000
    16             (Base Construction Allocation -
    17             $604,000)
    18     (b)  State Bridges
    19         (1)  SR 0018 over East Branch of Tributary
    20             of Conneaut Creek, Albion Borough,
    21             Bridge Replacement                            650,000
    22             (Base Construction Allocation -
    23             $400,000)
    24             (Land Allocation - $100,000)
    25             (Design and Contingencies - $150,000)
    26         (2)  SR 0006 over French Creek, Le Boeuf
    27             Township, Bridge Replacement                1,269,000
    28             (Base Construction Allocation -
    29             $984,000)
    30             (Land Allocation - $20,000)
    20030H2167B2938                 - 25 -     

     1             (Design and Contingencies - $265,000)
     2         (3)  SR 3002 over Conneaut Creek, Conneaut
     3             Township, Bridge Replacement                  660,000
     4             (Base Construction Allocation -
     5             $540,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $100,000)
     8         (4)  I-90 over Elk Creek and Railroad,
     9             Girard Township, Bridge Replacement         4,300,000
    10             (Base Construction Allocation -
    11             $280,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $4,000,000)
    14         (5)  Railroad over SR 2010, Ox Bow Road,
    15             Concord Township, Bridge Removal              500,000
    16             (Base Construction Allocation -
    17             $500,0000)
    18         (6)  Conrail Railroad over SR 2018, Lovell
    19             Road, Concord Township, Bridge
    20             Rehabilitation                                401,000
    21             (Base Construction Allocation -
    22             $400,000)
    23             (Land Allocation - $1,000)
    24  Section 30.  Fayette County.
    25     (a)  Local Bridges (Reserved)
    26     (b)  State Bridges
    27         (1)  SR 1031 over Mounts Creek, City of
    28             Connellsville, Bridge Replacement             920,000
    29             (Base Construction Allocation -
    30             $750,000)
    20030H2167B2938                 - 26 -     

     1             (Land Allocation - $45,000)
     2             (Design and Contingencies - $125,000)
     3  Section 31.  Forest County (Reserved).
     4  Section 32.  Franklin County.
     5     (a)  Local Bridges
     6         (1)  Guilford Township, Lincoln Road over
     7             Conocheague Creek, Bridge Replacement         222,000
     8             (Base Construction Allocation -
     9             $174,000)
    10             (Land Allocation - $8,000)
    11             (Design and Contingencies - $40,000)
    12         (2)  St. Thomas Township, T-481, Feed Mill
    13             Road over Back Creek, Bridge
    14             Replacement                                   474,000
    15             (Base Construction Allocation -
    16             $424,000)
    17             (Land Allocation - $8,000)
    18             (Design and Contingencies - $42,000)
    19         (3)  Lurgan Township, T-644, Mowersville
    20             Road over Paxton Run, Bridge
    21             Replacement                                   188,000
    22             (Base Construction Allocation -
    23             $140,000)
    24             (Land Allocation - $8,000)
    25             (Design and Contingencies - $40,000)
    26         (4)  Greene Township, Sycamore Grove Road
    27             over Conocheague Creek, Bridge
    28             Replacement                                   410,000
    29             (Base Construction Allocation -
    30             $362,000)
    20030H2167B2938                 - 27 -     

     1             (Land Allocation - $8,000)
     2             (Design and Contingencies - $40,000)
     3     (b)  State Bridges
     4         (1)  SR 3006 over I-81, Antrim Township,
     5             Bridge Rehabilitation                         655,000
     6             (Base Construction Allocation -
     7             $500,000)
     8             (Land Allocation - $5,000)
     9             (Design and Contingencies - $150,000)
    10         (2)  SR 0163 over I-81, Antrim Township,
    11             Bridge Rehabilitation                         605,000
    12             (Base Construction Allocation -
    13             $450,000)
    14             (Land Allocation - $5,000)
    15             (Design and Contingencies - $150,000)
    16         (3)  SR 3013 over Back Creek, St. Thomas
    17             Township, Bridge Replacement                1,635,000
    18             (Base Construction Allocation -
    19             $1,150,000)
    20             (Land Allocation - $35,000)
    21             (Design and Contingencies - $450,000)
    22         (4)  SR 0433 over Conodoguinet Creek,
    23             Lurgan and Southampton Townships,
    24             Bridge Replacement                          1,325,000
    25             (Base Construction Allocation -
    26             $840,000)
    27             (Land Allocation - $35,000)
    28             (Design and Contingencies - $450,000)
    29  Section 33.  Fulton County.
    30     (a)  Local Bridges
    20030H2167B2938                 - 28 -     

     1         (1)  Thompson Township, T-311, over Ditch
     2             Run, Bridge Replacement                       200,000
     3             (Base Construction Allocation -
     4             $200,000)
     5         (2)  Todd Township, T-415, Narrows Road
     6             over Licking Creek, Bridge
     7             Rehabilitation                                200,000
     8             (Base Construction Allocation -
     9             $200,000)
    10         (3)  Dublin Township, T-452, Boy Scout
    11             Bridge, Bridge Replacement                    200,000
    12             (Base Construction Allocation -
    13             $200,000)
    14         (4)  Bethel Township, T-359, Cider Mill
    15             Bridge, Bridge Replacement                    200,000
    16             (Base Construction Allocation -
    17             $200,000)
    18     (b)  State Bridges
    19         (1)  SR 0030 over SR 0522, Todd Township,
    20             Bridge Replacement                          3,010,000
    21             (Base Construction Allocation -
    22             $2,500,000)
    23             (Land Allocation - $60,000)
    24             (Design and Contingencies - $450,000)
    25  Section 34.  Greene County (Reserved).
    26  Section 35.  Huntingdon County.
    27     (a)  Local Bridges
    28         (1)  Saltillo Borough, T-328 over North
    29             Spring Creek, Bridge Rehabilitation           750,000
    30             (Base Construction Allocation -
    20030H2167B2938                 - 29 -     

     1             $560,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $180,000)
     4         (2)  Jackson Township, T-517, Davis Road
     5             Bridge, Bridge Replacement                    200,000
     6             (Base Construction Allocation -
     7             $200,000)
     8         (3)  Todd Township, T-370, Bakers Bridge,
     9             Bridge Replacement                            200,000
    10             (Base Construction Allocation -
    11             $200,000)
    12     (b)  State Bridges
    13         (1)  SR 0026 over Shavers Creek, Jackson
    14             Township, Bridge Replacement                  500,000
    15             (Base Construction Allocation -
    16             $500,000)
    17  Section 36.  Indiana County.
    18     (a)  Local Bridges
    19         (1)  Center Township, T-600, Smith Road
    20             over Cherry Run, Bridge Replacement           770,000
    21             (Base Construction Allocation -
    22             $500,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $250,000)
    25     (b)  State Bridges (Reserved)
    26  Section 37.  Jefferson County.
    27     (a)  Local Bridges
    28         (1)  Oliver Township, T-380, Clark Road
    29             over Hadden Run, Bridge Replacement           504,000
    30             (Base Construction Allocation -
    20030H2167B2938                 - 30 -     

     1             $500,000)
     2             (Land Allocation - $3,000)
     3             (Design and Contingencies - $1,000)
     4         (2)  Henderson Township, T-519, Spring Road
     5             over Big Run Creek, Bridge Replacement        810,000
     6             (Base Construction Allocation -
     7             $650,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $150,000)
    10         (3)  Pine Creek Township, T-452, Kirkman
    11             Road over Little Mill Creek, Bridge
    12             Replacement                                   860,000
    13             (Base Construction Allocation -
    14             $700,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $150,000)
    17     (b)  State Bridges (Reserved)
    18  Section 38.  Juniata County.
    19     (a)  Local Bridges (Reserved)
    20     (b)  State Bridges
    21         (1)  PA 235 over Cocolamus Creek, Delaware
    22             Township, Bridge Replacement                  770,000
    23             (Base Construction Allocation -
    24             $600,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $150,000)
    27         (2)  SR 2006 over Delaware Creek, Delaware
    28             Township, Bridge Replacement                  620,000
    29             (Base Construction Allocation -
    30             $450,000)
    20030H2167B2938                 - 31 -     

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $150,000)
     3         (3)  SR 3021 over Tuscarora Creek, Spruce
     4             Hill Township, Bridge Replacement             665,000
     5             (Base Construction Allocation -
     6             $500,000)
     7             (Land Allocation - $15,000)
     8             (Design and Contingencies - $150,000)
     9         (4)  SR 2003 over Doe Run, Walker Township,
    10             Bridge Replacement                            440,000
    11             (Base Construction Allocation -
    12             $300,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $120,000)
    15         (5)  SR 2010 over Cocolamus Creek, Delaware
    16             Township, Bridge Replacement                1,425,000
    17             (Base Construction Allocation -
    18             $900,000)
    19             (Land Allocation - $25,000)
    20             (Design and Contingencies - $500,000)
    21         (6)  SR 1006 Bridge No.2 over Horning Run,
    22             Fermanagh Township, Bridge Replacement        650,000
    23             (Base Construction Allocation -
    24             $600,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $30,000)
    27         (7)  SR 3008 over Tuscarora Creek, Milford
    28             and Turbett Townships, Bridge
    29             Replacement                                 1,825,000
    30             (Base Construction Allocation -
    20030H2167B2938                 - 32 -     

     1             $1,300,000)
     2             (Land Allocation - $25,000)
     3             (Design and Contingencies - $500,000)
     4         (8)  SR 0850, Laurel Run Bridge over Laurel
     5             Run, Tuscarora Township, Bridge
     6             Replacement                                 1,345,000
     7             (Base Construction Allocation -
     8             $960,000)
     9             (Land Allocation - $25,000)
    10             (Design and Contingencies - $360,000)
    11         (9)  SR 0850, Honey Grove Bridge over
    12             Laurel Run, Tuscarora Township, Bridge
    13             Replacement                                   650,000
    14             (Base Construction Allocation -
    15             $500,000)
    16             (Land Allocation - $50,000)
    17             (Design and Contingencies - $100,000)
    18  Section 39.  Lackawanna County.
    19     (a)  Local Bridges (Reserved)
    20     (b)  State Bridges
    21         (1)  I-84 over Roaring Brook Creek and
    22             Erie/Lackawanna Railroad, Roaring Brook
    23             Township, Bridge Rehabilitation               375,000
    24             (Base Construction Allocation -
    25             $375,000)
    26         (2)  SR 0006 over TR 632, Dalton Borough,
    27             Bridge Replacement                          1,520,000
    28             (Base Construction Allocation -
    29             $1,250,000)
    30             (Land Allocation - $20,000)
    20030H2167B2938                 - 33 -     

     1             (Design and Contingencies - $250,000)
     2         (3)  SR 1015 over Tunkhannock Creek, Benton
     3             Township, Bridge Replacement                  665,000
     4             (Base Construction Allocation -
     5             $345,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $300,000)
     8         (4)  SR 0011 over SR 6011, City of
     9             Scranton, Bridge Replacement                1,640,000
    10             (Base Construction Allocation -
    11             $1,350,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $270,000)
    14         (5)  I-81 Northbound over Railroad and
    15             Springbrook Creek, Moosic Borough,
    16             Bridge Replacement                          8,220,000
    17             (Base Construction Allocation -
    18             $6,800,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $1,400,000)
    21         (6)  I-81 Northbound over SR 8005, City of
    22             Scranton, Bridge Replacement                1,950,000
    23             (Base Construction Allocation -
    24             $1,600,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $330,000)
    27         (7)  I-81 over Abandoned Railroad, City of
    28             Scranton, Bridge Replacement                  830,000
    29             (Base Construction Allocation -
    30             $680,000)
    20030H2167B2938                 - 34 -     

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $130,000)
     3         (8)  I-81 over Leggett's Creek, South
     4             Abington Township, Bridge Replacement       1,060,000
     5             (Base Construction Allocation -
     6             $870,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $170,000)
     9         (9)  I-81 over Tunkhannock Creek, Scott
    10             Township, Bridge Replacement                1,800,000
    11             (Base Construction Allocation -
    12             $1,480,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $300,000)
    15         (10)  I-81 Northbound over SR 0438 and
    16             Tunkhannock Creek, Scott Township,
    17             Bridge Replacement                          6,020,000
    18             (Base Construction Allocation -
    19             $5,000,000)
    20             (Land Allocation - $20,000)
    21             (Design and Contingencies - $1,000,000)
    22         (11)  TR 107 over Rushbrook Creek, Scott
    23             Township, Bridge Replacement                  510,000
    24             (Base Construction Allocation -
    25             $410,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $80,000)
    28         (12)  SR 0347 over Kennedy Creek, Scott
    29             Township, Bridge Replacement                  380,000
    30             (Base Construction Allocation -
    20030H2167B2938                 - 35 -     

     1             $300,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $60,000)
     4         (13)  TR 524 over Kennedy Creek, North
     5             Abington Township, Bridge Replacement         440,000
     6             (Base Construction Allocation -
     7             $350,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $70,000)
    10         (14)  SR 1017 over Branch of Fall Brook,
    11             Greenfield Township, Bridge
    12             Replacement                                   260,000
    13             (Base Construction Allocation -
    14             $200,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $40,000)
    17         (15)  SR 2109, TR 449 over I-81, South
    18             Abington Township, Bridge Replacement       4,120,000
    19             (Base Construction Allocation -
    20             $3,400,000)
    21             (Land Allocation - $20,000)
    22             (Design and Contingencies - $700,000)
    23         (16)  SR 4005 over D&H Railroad, Benton
    24             Township, Bridge Replacement                2,180,000
    25             (Base Construction Allocation -
    26             $1,800,000)
    27             (Land Allocation - $20,000)
    28             (Design and Contingencies - $360,000)
    29         (17)  SR 4009 over D&H Railroad, Laplume
    30             Township, Bridge Replacement                1,720,000
    20030H2167B2938                 - 36 -     

     1             (Base Construction Allocation -
     2             $1,400,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $300,000)
     5         (18)  SR 4012 over D&H Railroad, Glenburn
     6             Township, Bridge Replacement                1,040,000
     7             (Base Construction Allocation -
     8             $850,000)
     9             (Land Allocation - $20,000)
    10             (Design and Contingencies - $170,000)
    11         (19)  SR 4028 over Tributary of Griffin
    12             Reservoir, Scott Township, Bridge
    13             Replacement                                   380,000
    14             (Base Construction Allocation -
    15             $300,000)
    16             (Land Allocation - $20,000)
    17             (Design and Contingencies - $60,000)
    18         (20)  SR 6006 over Leggett's Creek, City of
    19             Scranton, Bridge Replacement                1,210,000
    20             (Base Construction Allocation -
    21             $990,000)
    22             (Land Allocation - $20,000)
    23             (Design and Contingencies - $200,000)
    24         (21)  SR 4023 over I-81 Northbound and
    25             Southbound, South Abington Township,
    26             Bridge Replacement                          3,751,000
    27             (Base Construction Allocation -
    28             $3,109,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $622,000)
    20030H2167B2938                 - 37 -     

     1         (22)  SR 0435 over Lehigh River, Clifton
     2             Township, Bridge Replacement                  660,000
     3             (Base Construction Allocation -
     4             $533,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $107,000)
     7         (23)  I-84 over TR 435, Dunmore Borough,
     8             Bridge Replacement                          2,918,000
     9             (Base Construction Allocation -
    10             $2,415,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $483,000)
    13         (24)  I-81 over Railroad and Stafford
    14             Meadow Brook, City of Scranton, Bridge
    15             Replacement                                 7,314,000
    16             (Base Construction Allocation -
    17             $6,079,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $1,215,000)
    20         (25)  I-81 Northbound over TR 502, Moosic
    21             Borough, Bridge Replacement                 5,134,000
    22             (Base Construction Allocation -
    23             $4,262,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $852,000)
    26         (26)  I-81 Southbound over Stafford Meadow
    27             Brook, South Abington Township, Bridge
    28             Replacement                                 7,315,000
    29             (Base Construction Allocation -
    30             $6,079,000)
    20030H2167B2938                 - 38 -     

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $1,216,000)
     3  Section 40.  Lancaster County.
     4     (a)  Local Bridges
     5         (1)  Drumore and Colerain Townships, T-490,
     6             Wesley Road over Stewart Run, Bridge
     7             Replacement                                   309,000
     8             (Base Construction Allocation -
     9             $239,000)
    10             (Land Allocation - $30,000)
    11             (Design and Contingencies - $40,000)
    12     (b)  State Bridges
    13         (1)  SR 1035 over Hammer Creek, Warwick and
    14             Elizabeth Townships, Bridge
    15             Replacement                                   964,000
    16             (Base Construction Allocation -
    17             $871,000)
    18             (Land Allocation - $25,000)
    19             (Design and Contingencies - $68,000)
    20         (2)  US 222 over Landis Run, Manheim
    21             Township, Bridge Rehabilitation               465,000
    22             (Base Construction Allocation -
    23             $400,000)
    24             (Design and Contingencies - $65,000)
    25         (3)  SR 1070 over US 222, West Earl
    26             Township, Bridge Rehabilitation               166,000
    27             (Base Construction Allocation -
    28             $158,000)
    29             (Design and Contingencies - $8,000)
    30         (4)  US 222 over SR 0772, West Earl
    20030H2167B2938                 - 39 -     

     1             Township, Bridge Rehabilitation               920,000
     2             (Base Construction Allocation -
     3             $800,000)
     4             (Design and Contingencies - $120,000)
     5         (5)  US 222 over US 322, West Earl and
     6             Ephrata Townships, Bridge
     7             Rehabilitation                                920,000
     8             (Base Construction Allocation -
     9             $800,000)
    10             (Design and Contingencies - $120,000)
    11         (6)  SR 1084 over US 222, East Cocalico
    12             Township, Bridge Rehabilitation               635,000
    13             (Base Construction Allocation -
    14             $545,000)
    15             (Design and Contingencies - $90,000)
    16         (7)  US 222 over SR 1040, East Cocalico
    17             Township, Bridge Rehabilitation               790,000
    18             (Base Construction Allocation -
    19             $690,000)
    20             (Design and Contingencies - $100,000)
    21         (8)  SR 3016 over Abandoned Railroad,
    22             Providence Township, Bridge
    23             Replacement                                 1,025,000
    24             (Base Construction Allocation -
    25             $860,000)
    26             (Land Allocation - $40,000)
    27             (Design and Contingencies - $125,000)
    28         (9)  SR 0472 over West Branch Octoraro
    29             Creek, Colerain Township, Bridge
    30             Replacement                                 1,065,000
    20030H2167B2938                 - 40 -     

     1             (Base Construction Allocation -
     2             $860,000)
     3             (Land Allocation - $5,000)
     4             (Design and Contingencies - $200,000)
     5         (10)  US 30 over Pequea Creek, East
     6             Lampeter, Leacock and Paradise
     7             Townships, Bridge Replacement               3,050,000
     8             (Base Construction Allocation -
     9             $2,475,000)
    10             (Land Allocation - $75,000)
    11             (Design and Contingencies - $500,000)
    12         (11)  SR 0462 over Norfolk Southern,
    13             Mountville Borough, Bridge
    14             Rehabilitation                              1,080,000
    15             (Base Construction Allocation -
    16             $860,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $200,000)
    19         (12)  SR 2045 over Muddy Run, Leacock and
    20             Upper Leacock Townships, Bridge
    21             Replacement                                   815,000
    22             (Base Construction Allocation -
    23             $285,000)
    24             (Land Allocation - $30,000)
    25             (Design and Contingencies - $500,000)
    26  Section 41.  Lawrence County (Reserved).
    27  Section 42.  Lebanon County.
    28     (a)  Local Bridges
    29         (1)  Swatara Township, T-563 over Little
    30             Swatara Creek, Bridge Replacement             546,000
    20030H2167B2938                 - 41 -     

     1             (Base Construction Allocation -
     2             $489,000)
     3             (Land Allocation - $8,000)
     4             (Design and Contingencies - $49,000)
     5     (b)  State Bridges
     6         (1)  SR 4009 over Norfolk Southern, Palmyra
     7             Borough, Bridge Rehabilitation                460,000
     8             (Base Construction Allocation -
     9             $400,000)
    10             (Design and Contingencies - $60,000)
    11         (2)  SR 1009 over Tributary of Little
    12             Swatara Creek, Bethel Township, Bridge
    13             Replacement                                 1,020,000
    14             (Base Construction Allocation -
    15             $500,000)
    16             (Land Allocation - $20,000)
    17             (Design and Contingencies - $500,000)
    18         (3)  SR 2014 over Mill Creek, Millcreek
    19             Township, Bridge Replacement                1,110,000
    20             (Base Construction Allocation -
    21             $920,000)
    22             (Land Allocation - $40,000)
    23             (Design and Contingencies - $150,000)
    24         (4)  SR 0072 over Abandoned Railroad,
    25             Swatara Township, Bridge Removal              820,000
    26             (Base Construction Allocation -
    27             $650,000)
    28             (Land Allocation - $20,000)
    29             (Design and Contingencies - $150,000)
    30  Section 43.  Lehigh County.
    20030H2167B2938                 - 42 -     

     1     (a)  Local Bridges (Reserved)
     2     (b)  State Bridges
     3         (1)  SR 2030 over Saucon Creek, Upper
     4             Saucon Township, Bridge Removal               462,000
     5             (Base Construction Allocation -
     6             $347,000)
     7             (Land Allocation - $90,000)
     8             (Design and Contingencies - $25,000)
     9         (2)  SR 4019 over Jordan Creek, Heidelberg
    10             Township, Bridge Replacement                  795,000
    11             (Base Construction Allocation -
    12             $175,000)
    13             (Land Allocation - $70,000)
    14             (Design and Contingencies - $550,000)
    15  Section 44. Luzerne County.
    16     (a)  Local Bridges (Reserved)
    17     (b)  State Bridges
    18         (1)  SR 0011 over Tributary of Susquehanna
    19             River, Salem Township, Bridge
    20             Replacement                                   229,000
    21             (Base Construction Allocation -
    22             $174,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $35,000)
    25         (2)  SR 0118 over Kitchen Creek, Fairmount
    26             Township, Bridge Replacement                  860,000
    27             (Base Construction Allocation -
    28             $700,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $140,000)
    20030H2167B2938                 - 43 -     

     1         (3)  SR 0118 over Tributary of Huntsville
     2             Dam, Lehman Township, Bridge
     3             Replacement                                   520,000
     4             (Base Construction Allocation -
     5             $420,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $80,000)
     8         (4)  SR 0239 over Branch of Huntington
     9             Creek, Huntington Township, Bridge
    10             Replacement                                   430,000
    11             (Base Construction Allocation -
    12             $340,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $70,000)
    15         (5)  SR 0309 over Toby Creek, Kingston
    16             Township, Bridge Replacement                1,580,000
    17             (Base Construction Allocation -
    18             $1,300,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $260,000)
    21         (6)  SR 0309 over Toby Creek No.2, Kingston
    22             Township, Bridge Replacement                2,530,000
    23             (Base Construction Allocation -
    24             $2,100,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $410,000)
    27         (7)  SR 0309 over Toby Creek No.3, Kingston
    28             Township, Bridge Replacement                1,290,000
    29             (Base Construction Allocation -
    30             $1,060,000)
    20030H2167B2938                 - 44 -     

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $210,000)
     3         (8)  SR 0309 over Toby Creek No.4, Pringle
     4             Borough, Bridge Replacement                 1,060,000
     5             (Base Construction Allocation -
     6             $870,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $170,000)
     9         (9)  SR 0309 over Tributary of Toby Creek,
    10             Kingston Township, Bridge Replacement         570,000
    11             (Base Construction Allocation -
    12             $460,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $90,000)
    15         (10)  SR 0415 over Huntsville Creek, Dallas
    16             Township, Bridge Replacement                  510,000
    17             (Base Construction Allocation -
    18             $410,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $80,000)
    21         (11)  SR 1012 over Branch of Harveys Creek,
    22             Jackson Township, Bridge Replacement          430,000
    23             (Base Construction Allocation -
    24             $340,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $70,000)
    27         (12)  SR 1012 over Branch of Harveys Creek
    28             No.2, Jackson Township, Bridge
    29             Replacement                                   430,000
    30             (Base Construction Allocation -
    20030H2167B2938                 - 45 -     

     1             $340,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $70,000)
     4         (13)  SR 1014 over SR 0309, Dallas
     5             Township, Bridge Replacement                1,180,000
     6             (Base Construction Allocation -
     7             $960,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $200,000)
    10         (14)  SR 1044 over Branch of Toby Creek,
    11             Dallas Township, Bridge Replacement           430,000
    12             (Base Construction Allocation -
    13             $340,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $70,000)
    16         (15)  SR 1048 over Harveys Creek, Lehman
    17             Township, Bridge Replacement                  470,000
    18             (Base Construction Allocation -
    19             $380,000)
    20             (Land Allocation - $20,000)
    21             (Design and Contingencies - $70,000)
    22         (16)  SR 1061 over Harveys Creek, Lehman
    23             Township, Bridge Replacement                  430,000
    24             (Base Construction Allocation -
    25             $340,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $70,000)
    28         (17)  SR 3004 over Tributary of Newport
    29             Creek, Newport Township, Bridge
    30             Replacement                                   470,000
    20030H2167B2938                 - 46 -     

     1             (Base Construction Allocation -
     2             $375,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $75,000)
     5         (18)  SR 4013 over Maple Run Creek,
     6             Fairmount Township, Bridge Replacement        427,000
     7             (Base Construction Allocation -
     8             $340,000)
     9             (Land Allocation - $20,000)
    10             (Design and Contingencies - $67,000)
    11         (19)  SR 4016 over Marsh Creek, Huntington
    12             Township, Bridge Replacement                  583,000
    13             (Base Construction Allocation -
    14             $470,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $93,000)
    17         (20)  SR 4028 over Branch of Huntington
    18             Creek, Ross Township, Bridge
    19             Replacement                                   428,000
    20             (Base Construction Allocation -
    21             $340,000)
    22             (Land Allocation - $20,000)
    23             (Design and Contingencies - $68,000)
    24         (21)  I-81 Northbound over SR 2039 and
    25             Gardner Creek, Laflin Borough, Bridge
    26             Replacement                                 3,940,000
    27             (Base Construction Allocation -
    28             $3,267,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $653,000)
    20030H2167B2938                 - 47 -     

     1         (22)  I-81 Northbound over Conrail
     2             Railroad, Laflin Borough, Bridge
     3             Replacement                                 3,826,000
     4             (Base Construction Allocation -
     5             $3,172,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $634,000)
     8         (23)  I-81 Southbound over SR 2039 and
     9             Gardner Creek, Laflin Borough, Bridge
    10             Replacement                                 4,983,000
    11             (Base Construction Allocation -
    12             $4,136,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $827,000)
    15         (24)  I-81 Southbound over SR 2017, Laflin
    16             Borough, Bridge Replacement                 2,382,000
    17             (Base Construction Allocation -
    18             $1,968,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $394,000)
    21         (25)  I-81 Northbound over TR 315, Jenkins
    22             Township, Bridge Replacement                5,628,000
    23             (Base Construction Allocation -
    24             $4,673,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $935,000)
    27         (26)  I-81 Northbound over TR 315, Pittston
    28             Township, Bridge Replacement                4,357,000
    29             (Base Construction Allocation -
    30             $3,614,000)
    20030H2167B2938                 - 48 -     

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $723,000)
     3         (27)  I-81 Southbound over TR 315, Pittston
     4             Township, Bridge Replacement                6,748,000
     5             (Base Construction Allocation -
     6             $5,606,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $1,121,000)
     9         (28)  I-81 Northbound over SR 8011, Hanover
    10             Township, Bridge Replacement                3,713,000
    11             (Base Construction Allocation -
    12             $3,077,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $616,000)
    15         (29)  I-81 Southbound over SR 8011, Hanover
    16             Township, Bridge Replacement                4,659,000
    17             (Base Construction Allocation -
    18             $3,866,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $773,000)
    21         (30)  I-81 Northbound over SR 6309, Ashley
    22             Borough, Bridge Replacement                 7,092,000
    23             (Base Construction Allocation -
    24             $5,893,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $1,179,000)
    27         (31)  I-81 Northbound over Pocono Northeast
    28             Railroad, Ashley Borough, Bridge
    29             Replacement                                 4,490,000
    30             (Base Construction Allocation -
    20030H2167B2938                 - 49 -     

     1             $3,725,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $745,000)
     4         (32)  I-81 Northbound over Johnson Street,
     5             Wilkes-Barre Township, Bridge
     6             Replacement                                 4,357,000
     7             (Base Construction Allocation -
     8             $3,614,000)
     9             (Land Allocation - $20,000)
    10             (Design and Contingencies - $723,000)
    11         (33)  I-81 Southbound over Johnson Street,
    12             Wilkes-Barre Township, Bridge
    13             Replacement                                 4,281,000
    14             (Base Construction Allocation -
    15             $3,551,000)
    16             (Land Allocation - $20,000)
    17             (Design and Contingencies - $710,000)
    18         (34)  SR 0029 over Haul Road, Hanover
    19             Township, Bridge Replacement                4,598,000
    20             (Base Construction Allocation -
    21             $3,815,000)
    22             (Land Allocation - $20,000)
    23             (Design and Contingencies - $763,000)
    24  Section 45.  Lycoming County (Reserved).
    25  Section 46.  McKean County.
    26     (a)  Local Bridges (Reserved)
    27     (b)  State Bridges
    28         (1)  SR 2001 over Seven Mile Run, Sergeant
    29             Township, Bridge Replacement                  620,000
    30             (Base Construction Allocation -
    20030H2167B2938                 - 50 -     

     1             $450,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $150,000)
     4         (2)  SR 4013 Seaward Avenue over Bolivar
     5             Run, City of Bradford, Bridge
     6             Replacement                                 3,000,000
     7             (Base Construction Allocation -
     8             $2,000,000)
     9             (Land Allocation - $500,000)
    10             (Design and Contingencies - $500,000)
    11  Section 47.  Mercer County.
    12     (a)  Local Bridges
    13         (1)  Pymatuning Township, Kidds Mill Bridge
    14             over Shenango River, Bridge
    15             Replacement                                   620,000
    16             (Base Construction Allocation -
    17             $614,000)
    18             (Land Allocation - $6,000)
    19         (2)  Pine Township, T-878 over Wolf Creek,
    20             Bridge Replacement                          5,540,000
    21             (Base Construction Allocation -
    22             $355,000)
    23             (Land Allocation - $5,000,000)
    24             (Design and Contingencies - $185,000)
    25     (b)  State Bridges
    26         (1)  US 62 over Shenango River, City of
    27             Sharon, Bridge Rehabilitation               3,100,000
    28             (Base Construction Allocation -
    29             $2,700,000)
    30             (Land Allocation - $30,000)
    20030H2167B2938                 - 51 -     

     1             (Design and Contingencies - $370,000)
     2         (2)  PA 158 over West Branch of Little
     3             Neshannock, Wilmington Township, Bridge
     4             Replacement                                   950,000
     5             (Base Construction Allocation -
     6             $840,000)
     7             (Land Allocation - $30,000)
     8             (Design and Contingencies - $80,000)
     9         (3)  PA 208 over Wolf Creek, Grove City
    10             Borough, Bridge Replacement                 1,580,000
    11             (Base Construction Allocation -
    12             $1,100,000)
    13             (Land Allocation - $380,000)
    14             (Design and Contingencies - $100,000)
    15         (4)  SR 2025 North Liberty Road over Lake
    16             Bashmore Outlet, Pine Township, Bridge
    17             Replacement                                   255,000
    18             (Base Construction Allocation -
    19             $160,000)
    20             (Land Allocation - $35,000)
    21             (Design and Contingencies - $60,000)
    22         (5)  SR 4006 over Shenango River, West
    23             Salem Township, Bridge Replacement          3,250,000
    24             (Base Construction Allocation -
    25             $3,000,000)
    26             (Land Allocation - $250,000)
    27  Section 48.  Mifflin County.
    28     (a)  Local Bridges (Reserved).
    29     (b)  State Bridges
    30         (1)  SR 1002 over Honey Creek, Armagh
    20030H2167B2938                 - 52 -     

     1             Township, Bridge Replacement                  840,000
     2             (Base Construction Allocation -
     3             $800,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $30,000)
     6         (2)  SR 0305 over Little Kish Creek, Union
     7             Township, Bridge Replacement                  650,000
     8             (Base Construction Allocation -
     9             $450,000)
    10             (Land Allocation - $100,000)
    11             (Design and Contingencies - $100,000)
    12  Section 49.  Monroe County.
    13     (a)  Local Bridges (Reserved)
    14     (b)  State Bridges
    15         (1)  SR 3018 over Appenzell Creek, Jackson
    16             Township, Bridge Replacement                1,250,000
    17             (Base Construction Allocation -
    18             $800,000)
    19             (Land Allocation - $150,000)
    20             (Design and Contingencies - $300,000)
    21         (2)  SR 3022 over McMichael Creek, Hamilton
    22             Township, Bridge Replacement                1,290,000
    23             (Base Construction Allocation -
    24             $900,000)
    25             (Land Allocation - $190,000)
    26             (Design and Contingencies - $200,000)
    27  Section 50.  Montgomery County.
    28     (a)  Local Bridges
    29         (1)  Upper Frederick Township, Colonial
    30             Road over Swamp Creek, Bridge
    20030H2167B2938                 - 53 -     

     1             Replacement                                 1,442,000
     2             (Base Construction Allocation -
     3             $1,000,000)
     4             (Land Allocation - $100,000)
     5             (Design and Contingencies - $342,000)
     6     (b)  State Bridges
     7         (1)  SR 4022 over Branch of Schuylkill
     8             River, Limerick Township, Bridge
     9             Replacement                                 1,167,500
    10             (Base Construction Allocation -
    11             $862,500)
    12             (Land Allocation - $40,000)
    13             (Design and Contingencies - $265,000)
    14         (2)  SR 1003, Kutztown Road over Molasses
    15             Creek, Upper Hanover Township, Bridge
    16             Replacement                                 1,037,500
    17             (Base Construction Allocation -
    18             $575,000)
    19             (Land Allocation - $30,000)
    20             (Design and Contingencies - $432,500)
    21  Section 51.  Montour County (Reserved).
    22  Section 52.  Northampton County (Reserved).
    23  Section 53.  Northumberland County (Reserved).
    24  Section 54.  Perry County.
    25     (a)  Local Bridges
    26         (1)  Tyrone Township, T-333 over Shermans
    27             Creek, Bridge Replacement                     768,000
    28             (Base Construction Allocation -
    29             $552,000)
    30             (Land Allocation - $77,000)
    20030H2167B2938                 - 54 -     

     1             (Design and Contingencies - $139,000)
     2         (2)  Oliver Township, Fairground Road over
     3             Big Buffalo Creek, Bridge Replacement         470,000
     4             (Base Construction Allocation -
     5             $422,000)
     6             (Land Allocation - $8,000)
     7             (Design and Contingencies - $40,000)
     8         (3)  Saville Township, Eschol Road over Big
     9             Buffalo Creek, Bridge Replacement             408,000
    10             (Base Construction Allocation -
    11             $360,000)
    12             (Land Allocation - $8,000)
    13             (Design and Contingencies - $40,000)
    14         (4)  Toboyne Township, T-300 over Brown's
    15             Run, Bridge Replacement                       260,000
    16             (Base Construction Allocation -
    17             $212,000)
    18             (Land Allocation - $8,000)
    19             (Design and Contingencies - $40,000)
    20         (5)  Wheatfield Township, T-347 over Dark
    21             Run, Bridge Replacement                       222,000
    22             (Base Construction Allocation -
    23             $174,000)
    24             (Land Allocation - $8,000)
    25             (Design and Contingencies - $40,000)
    26         (6)  Toboyne Township, Upper Buck Road over
    27             Sherman Creek, Bridge Replacement             260,000
    28             (Base Construction Allocation -
    29             $212,000)
    30             (Land Allocation - $8,000)
    20030H2167B2938                 - 55 -     

     1             (Design and Contingencies - $40,000)
     2         (7)  Greenwood Township, Mountain Road over
     3             Wildcat Run, Bridge Replacement               236,000
     4             (Base Construction Allocation -
     5             $188,000)
     6             (Land Allocation - $8,000)
     7             (Design and Contingencies - $40,000)
     8         (8)  Jackson Township, Mount Pleasant Road,
     9             T-304 over Sherman Creek, Bridge
    10             Rehabilitation                                411,000
    11             (Base Construction Allocation -
    12             $341,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $60,000)
    15         (9)  Duncannon Borough, High Street over
    16             Little Juniata Creek, Bridge
    17             Replacement                                   374,000
    18             (Base Construction Allocation -
    19             $326,000)
    20             (Land Allocation - $8,000)
    21             (Design and Contingencies - $40,000)
    22         (10)  Tyrone Township, Wagoner's Bridge
    23             over Bixler Run No.5, Bridge
    24             Replacement                                   363,000
    25             (Base Construction Allocation -
    26             $315,000)
    27             (Land Allocation - $8,000)
    28             (Design and Contingencies - $40,000)
    29     (b)  State Bridges
    30         (1)  SR 0274 over Cisna Run, Southwest
    20030H2167B2938                 - 56 -     

     1             Madison Township, Bridge Replacement          745,000
     2             (Base Construction Allocation -
     3             $230,000)
     4             (Land Allocation - $15,000)
     5             (Design and Contingencies - $500,000)
     6         (2)  SR 3009 over Shermans Creek, Southwest
     7             Madison Township, Bridge
     8             Rehabilitation                                101,000
     9             (Base Construction Allocation -
    10             $81,000)
    11             (Design and Contingencies - $20,000)
    12  Section 55.  Philadelphia County.
    13     (a)  Local Bridges
    14         (1)  City of Philadelphia, Sedgley Avenue
    15             over Abandoned Railroad, Bridge
    16             Removal                                     1,100,000
    17             (Base Construction Allocation -
    18             $1,000,000)
    19             (Land Allocation - $100,000)
    20     (b)  State Bridges (Reserved)
    21  Section 56.  Pike County.
    22     (a)  Local Bridges (Reserved)
    23     (b)  State Bridges
    24         (1)  SR 0006 over PPL Flume, Palmyra
    25             Township, Bridge Replacement               13,104,000
    26             (Base Construction Allocation -
    27             $11,284,000)
    28             (Land Allocation - $20,000)
    29             (Design and Contingencies - $1,800,000)
    30         (2)  SR 0006 over Blooming Grove Creek,
    20030H2167B2938                 - 57 -     

     1             Lackawaxen Township, Bridge
     2             Replacement                                 1,240,000
     3             (Base Construction Allocation -
     4             $1,050,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $170,000)
     7         (3)  TR 6 over Vandermark Creek, Milford
     8             Borough, Bridge Replacement                 1,330,000
     9             (Base Construction Allocation -
    10             $670,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $640,000)
    13         (4)  I-84 Westbound and Eastbound over T-
    14             430, Dingman Township, Bridge
    15             Replacement                                 1,390,000
    16             (Base Construction Allocation -
    17             $1,180,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $190,000)
    20         (5)  I-84 over Delaware River, Matamoras
    21             Borough, Bridge Replacement                20,770,000
    22             (Base Construction Allocation -
    23             $17,290,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $3,460,000)
    26         (6)  TR 209 over Sawkill Creek, Milford
    27             Borough, Bridge Replacement                 2,860,000
    28             (Base Construction Allocation -
    29             $2,370,000)
    30             (Land Allocation - $20,000)
    20030H2167B2938                 - 58 -     

     1             (Design and Contingencies - $470,000)
     2         (7)  TR 390 over Leavitt Creek, Greene
     3             Township, Bridge Replacement                  510,000
     4             (Base Construction Allocation -
     5             $410,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $80,000)
     8         (8)  TR 390 over Bridge Creek, Greene
     9             Township, Bridge Replacement                  780,000
    10             (Base Construction Allocation -
    11             $630,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $130,000)
    14         (9)  SR 0390 over Outlet of Fairview Lake,
    15             Palmyra Township, Bridge Replacement          460,000
    16             (Base Construction Allocation -
    17             $370,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $70,000)
    20         (10)  SR 0402 over Shohola Creek, Blooming
    21             Grove Township, Bridge Replacement            630,000
    22             (Base Construction Allocation -
    23             $510,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $100,000)
    26         (11)  SR 0403 over Branch of Ballard Creek,
    27             Lackawaxen Township, Bridge
    28             Replacement                                   550,000
    29             (Base Construction Allocation -
    30             $440,000)
    20030H2167B2938                 - 59 -     

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $90,000)
     3         (12)  SR 0434 over Branch of Ballard Creek,
     4             Lackawaxen Township, Bridge
     5             Replacement                                   500,000
     6             (Base Construction Allocation -
     7             $400,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $80,000)
    10         (13)  SR 0739 over Outlet of McConnell
    11             Lake, Blooming Grove Township, Bridge
    12             Replacement                                   560,000
    13             (Base Construction Allocation -
    14             $450,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $90,000)
    17         (14)  SR 0739 over Tributary of Billings
    18             Creek, Blooming Grove Township, Bridge
    19             Replacement                                   400,000
    20             (Base Construction Allocation -
    21             $320,000)
    22             (Land Allocation - $20,000)
    23             (Design and Contingencies - $60,000)
    24         (15)  SR 1014 over West Colang Creek,
    25             Lackawaxen Township, Bridge
    26             Replacement                                   800,000
    27             (Base Construction Allocation -
    28             $390,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $390,000)
    20030H2167B2938                 - 60 -     

     1         (16)  SR 3001 over East Branch of
     2             Wallenpaupack Creek, Greene Township,
     3             Bridge Replacement                          1,440,000
     4             (Base Construction Allocation -
     5             $1,220,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $200,000)
     8         (17)  SR 3006 over Branch of Wallenpaupack
     9             Creek, Greene Township, Bridge
    10             Replacement                                   760,000
    11             (Base Construction Allocation -
    12             $640,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $100,000)
    15         (18)  SR 3012 over Freeling Run, Greene
    16             Township, Bridge Replacement                  360,000
    17             (Base Construction Allocation -
    18             $280,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $60,000)
    21         (19)  SR 4004 over Fairview Outlet,
    22             Blooming Grove Township, Bridge
    23             Replacement                                   510,000
    24             (Base Construction Allocation -
    25             $410,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $80,000)
    28         (20)  SR 4006 over West Falls Creek,
    29             Lackawaxen Township, Bridge
    30             Replacement                                   630,000
    20030H2167B2938                 - 61 -     

     1             (Base Construction Allocation -
     2             $510,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $100,000)
     5         (21)  I-84 Westbound over Wallenpaupack
     6             Creek, Greene Township, Bridge
     7             Replacement                                 6,278,000
     8             (Base Construction Allocation -
     9             $5,215,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $1,043,000)
    12         (22)  I-84 Westbound over SR 2011, Dingman
    13             Township, Bridge Replacement                2,661,000
    14             (Base Construction Allocation -
    15             $2,201,000)
    16             (Land Allocation - $20,000)
    17             (Design and Contingencies - $440,000)
    18         (23)  SR 0209 Junction with SR 2013 over
    19             Sawkill Creek, Milford Borough, Bridge
    20             Replacement                                 1,900,000
    21             (Base Construction Allocation -
    22             $1,630,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $250,000)
    25         (24)  SR 0006 over Sawkill Creek, Milford
    26             Township, Bridge Replacement                  662,000
    27             (Base Construction Allocation -
    28             $560,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $92,000)
    20030H2167B2938                 - 62 -     

     1         (25)  SR 4003 over Masthope Creek,
     2             Lackawaxen Township, Bridge
     3             Replacement                                   208,000
     4             (Base Construction Allocation -
     5             $170,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $28,000)
     8         (26)  SR 0590 over West Falls Creek,
     9             Lackawaxen Township, Bridge
    10             Replacement                                   167,000
    11             (Base Construction Allocation -
    12             $152,000)
    13             (Design and Contingencies - $15,000)
    14  Section 57.  Potter County.
    15     (a)  Local Bridges (Reserved)
    16     (b)  State Bridges
    17         (1)  SR 4003 over Clara Creek, Clara
    18             Township, Bridge Replacement                1,340,000
    19             (Base Construction Allocation -
    20             $900,000)
    21             (Land Allocation - $40,000)
    22             (Design and Contingencies - $400,000)
    23         (2)  SR 0044 over South Branch of Oswayo
    24             Creek, Hebron Township, Bridge
    25             Replacement                                   390,000
    26             (Base Construction Allocation -
    27             $290,000)
    28             (Land Allocation - $30,000)
    29             (Design and Contingencies - $70,000)
    30         (3)  SR 4017 over Bell Run, Sharon
    20030H2167B2938                 - 63 -     

     1             Township, Bridge Replacement                  470,000
     2             (Base Construction Allocation -
     3             $350,000)
     4             (Land Allocation - $20,000)
     5             (Design and Contingencies - $100,000)
     6         (4)  SR 1016 over White Branch of North
     7             Fork, Harrison Township, Bridge
     8             Replacement                                   870,000
     9             (Base Construction Allocation -
    10             $540,000)
    11             (Land Allocation - $25,000)
    12             (Design and Contingencies - $305,000)
    13         (5)  SR 1016 over White Branch of North
    14             Fork No.2, Harrison Township, Bridge
    15             Replacement                                   520,000
    16             (Base Construction Allocation -
    17             $400,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $100,000)
    20         (6)  SR 0244 over West Branch of Genesee
    21             River, Genesee Township with Village of
    22             Ellisburg, Bridge Replacement               1,120,000
    23             (Base Construction Allocation -
    24             $800,000)
    25             (Land Allocation - $40,000)
    26             (Design and Contingencies - $280,000)
    27  Section 58.  Schuylkill County (Reserved).
    28  Section 59.  Snyder County (Reserved).
    29  Section 60.  Somerset County.
    30     (a)  Local Bridges
    20030H2167B2938                 - 64 -     

     1         (1)  Shade Township, T-712, Philson Bridge
     2             over Dark Shade Creek, Bridge
     3             Replacement                                   200,000
     4             (Base Construction Allocation -
     5             $200,000)
     6         (2)  Shade Township, T-713, Rockingham
     7             Bridge over Dark Shade Creek, Bridge
     8             Replacement                                   200,000
     9             (Base Construction Allocation -
    10             $200,000)
    11     (b)  State Bridges
    12         (1)  SR 0403 over Tributary of Stoney
    13             Creek, Conemaugh Township, Bridge
    14             Replacement                                   610,000
    15             (Base Construction Allocation -
    16             $400,000)
    17             (Land Allocation - $85,000)
    18             (Design and Contingencies - $125,000)
    19         (2)  SR 1010 over Run, Shade Township,
    20             Bridge Replacement                            500,000
    21             (Base Construction Allocation -
    22             $500,000)
    23  Section 61.  Sullivan County (Reserved).
    24  Section 62.  Susquehanna County.
    25     (a)  Local Bridges
    26         (1)  New Milford Borough, Church Street
    27             over Salt Lick Creek, Bridge
    28             Replacement                                 1,000,000
    29             (Base Construction Allocation -
    30             $750,000)
    20030H2167B2938                 - 65 -     

     1             (Land Allocation - $50,000)
     2             (Design and Contingencies - $200,000)
     3     (b)  State Bridges
     4         (1)  SR 0011 over Abandoned Feedmill Chute,
     5             Hop Bottom Borough, Bridge Replacement        332,000
     6             (Base Construction Allocation -
     7             $260,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $52,000)
    10         (2)  I-81 over East Branch of Tunkhannock
    11             Creek, Lenox Township, Bridge
    12             Replacement                                13,176,000
    13             (Base Construction Allocation -
    14             $10,963,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $2,193,000)
    17         (3)  I-81 Northbound over Tunkhannock
    18             Creek, Lenox Township, Bridge
    19             Replacement                                 4,249,000
    20             (Base Construction Allocation -
    21             $3,524,000)
    22             (Land Allocation - $20,000)
    23             (Design and Contingencies - $705,000)
    24         (4)  I-81 Southbound over Tunkhannock
    25             Creek, Lenox Township, Bridge
    26             Replacement                                 4,249,000
    27             (Base Construction Allocation -
    28             $3,524,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $705,000)
    20030H2167B2938                 - 66 -     

     1         (5)  I-81 over TR 92, Lenox Township,
     2             Bridge Replacement                          1,093,000
     3             (Base Construction Allocation -
     4             $894,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $179,000)
     7         (6)  SR 0092 over Branch of Tunkhannock
     8             Creek, Lenox Township, Bridge
     9             Replacement                                   308,000
    10             (Base Construction Allocation -
    11             $240,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $48,000)
    14         (7)  SR 0106 over Round Pond Creek, Lenox
    15             Township, Bridge Replacement                  739,000
    16             (Base Construction Allocation -
    17             $599,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $120,000)
    20         (8)  SR 0106/SR 2050 Intersection over
    21             Branch of Tunkhannock Creek, Clifford
    22             Township, Bridge Replacement                  428,000
    23             (Base Construction Allocation -
    24             $340,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $68,000)
    27         (9)  SR 0106 over East Branch of
    28             Tunkhannock Creek, Clifford Township,
    29             Bridge Replacement                            565,000
    30             (Base Construction Allocation -
    20030H2167B2938                 - 67 -     

     1             $454,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $91,000)
     4         (10)  SR 0167 over Martins Creek, Hop
     5             Bottom Borough, Bridge Replacement          1,580,000
     6             (Base Construction Allocation -
     7             $1,300,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $260,000)
    10         (11)  SR 0247 over Dundaff Creek No.1,
    11             Clifford Township, Bridge Replacement         428,000
    12             (Base Construction Allocation -
    13             $340,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $68,000)
    16         (12)  SR 0247 over Dundaff Creek No.2,
    17             Clifford Township, Bridge Replacement         428,000
    18             (Base Construction Allocation -
    19             $340,000)
    20             (Land Allocation - $20,000)
    21             (Design and Contingencies - $68,000)
    22         (13)  SR 0374 over West Branch of
    23             Lackawanna River, Herrick Township,
    24             Bridge Replacement                            792,000
    25             (Base Construction Allocation -
    26             $643,000)
    27             (Land Allocation - $20,000)
    28             (Design and Contingencies - $129,000)
    29         (14)  SR 0547 over I-81, Harford Township,
    30             Bridge Replacement                          3,297,000
    20030H2167B2938                 - 68 -     

     1             (Base Construction Allocation -
     2             $2,731,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $546,000)
     5         (15)  SR 1001 over Branch of Tunkhannock
     6             Creek, Gibson Township, Bridge
     7             Replacement                                   428,000
     8             (Base Construction Allocation -
     9             $340,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $68,000)
    12         (16)  SR 1003 over Branch of Starrucca
    13             Creek, Thompson Township, Bridge
    14             Replacement                                   325,000
    15             (Base Construction Allocation -
    16             $254,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $51,000)
    19         (17)  SR 1010 over Bedbug Creek, Oakland
    20             Township, Bridge Replacement                  325,000
    21             (Base Construction Allocation -
    22             $254,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $51,000)
    25         (18)  SR 1011 over Hemlock Creek No.1,
    26             Harmony Township, Bridge Replacement          757,000
    27             (Base Construction Allocation -
    28             $614,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $123,000)
    20030H2167B2938                 - 69 -     

     1         (19)  SR 1011 over Hemlock Creek No.2,
     2             Harmony Township, Bridge Replacement          613,000
     3             (Base Construction Allocation -
     4             $494,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $99,000)
     7         (20)  SR 1012 over Lewis Creek, Oakland
     8             Township, Bridge Replacement                  568,000
     9             (Base Construction Allocation -
    10             $457,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $91,000)
    13         (21)  SR 1017 over Tributary of Susquehanna
    14             River, Lanesboro Borough, Bridge
    15             Replacement                                   340,000
    16             (Base Construction Allocation -
    17             $267,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $53,000)
    20         (22)  SR 1025 over Branch of Denton Creek,
    21             Oakland Township, Bridge Replacement          357,000
    22             (Base Construction Allocation -
    23             $281,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $56,000)
    26         (23)  SR 2002 over Outlet of Tarbett Pond,
    27             Lathrop Township, Bridge Replacement          553,000
    28             (Base Construction Allocation -
    29             $444,000)
    30             (Land Allocation - $20,000)
    20030H2167B2938                 - 70 -     

     1             (Design and Contingencies - $89,000)
     2         (24)  SR 2012 over Tributary of East Branch
     3             of Tunkhannock Creek, Clifford
     4             Township, Bridge Replacement                  428,000
     5             (Base Construction Allocation -
     6             $340,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $68,000)
     9         (25)  SR 2012 over Tinker Brook, Clifford
    10             Township, Bridge Replacement                  694,000
    11             (Base Construction Allocation -
    12             $570,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $104,000)
    15         (26)  SR 2016 over Tributary of East Branch
    16             of Tunkhannock Creek, Lenox Township,
    17             Bridge Replacement                            292,000
    18             (Base Construction Allocation -
    19             $227,000)
    20             (Land Allocation - $20,000)
    21             (Design and Contingencies - $45,000)
    22         (27)  SR 2016 over Outlet of Harding Pond,
    23             Lenox Township, Bridge Replacement            457,000
    24             (Base Construction Allocation -
    25             $364,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $73,000)
    28         (28)  SR 2017 over D&H Railroad, Hop Bottom
    29             Borough, Bridge Replacement                 1,204,000
    30             (Base Construction Allocation -
    20030H2167B2938                 - 71 -     

     1             $987,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $197,000)
     4         (29)  SR 2027 over East Branch of
     5             Tunkhannock Creek, Clifford Township,
     6             Bridge Replacement                            885,000
     7             (Base Construction Allocation -
     8             $721,000)
     9             (Land Allocation - $20,000)
    10             (Design and Contingencies - $144,000)
    11         (30)  SR 2036 over Overflow Channel of
    12             Tunkhannock Creek, Gibson Township,
    13             Bridge Replacement                            428,000
    14             (Base Construction Allocation -
    15             $340,000)
    16             (Land Allocation - $20,000)
    17             (Design and Contingencies - $68,000)
    18         (31)  SR 2041 over Canadian Pacific
    19             Railroad, Hop Bottom Borough, Bridge
    20             Replacement                                 1,220,000
    21             (Base Construction Allocation -
    22             $1,000,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $200,000)
    25         (32)  SR 2045 over Millard Creek, Lenox
    26             Township, Bridge Replacement                  340,000
    27             (Base Construction Allocation -
    28             $267,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $53,000)
    20030H2167B2938                 - 72 -     

     1         (33)  SR 2061 over Tributary of Gillespie
     2             Pond, New Milford Township, Bridge
     3             Replacement                                   428,000
     4             (Base Construction Allocation -
     5             $340,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $68,000)
     8         (34)  SR 2067 over Brundage Creek, Clifford
     9             Township, Bridge Replacement                  292,000
    10             (Base Construction Allocation -
    11             $227,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $45,000)
    14         (35)  SR 2067 over Bell Creek, Gibson
    15             Township, Bridge Replacement                  357,000
    16             (Base Construction Allocation -
    17             $281,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $56,000)
    20         (36)  SR 3017 over Outlet of State Pond,
    21             Springville Township, Bridge
    22             Replacement                                 1,108,000
    23             (Base Construction Allocation -
    24             $907,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $181,000)
    27         (37)  SR 3001 over Riley Creek, Auburn
    28             Township, Bridge Replacement                  386,000
    29             (Base Construction Allocation -
    30             $305,000)
    20030H2167B2938                 - 73 -     

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $61,000)
     3  Section 63.  Tioga County (Reserved).
     4  Section 64.  Union County.
     5     (a)  Local Bridges (Reserved)
     6     (b)  State Bridges
     7         (1)  SR 1003 over Mill Race, Kelly
     8             Township, Bridge Replacement                  625,000
     9             (Base Construction Allocation -
    10             $500,000)
    11             (Land Allocation - $25,000)
    12             (Design and Contingencies - $100,000)
    13  Section 65.  Venango County.
    14     (a)  Local Bridges
    15         (1)  Cherrytree Township, Barker Road over
    16             Prather Creek, Bridge Replacement             520,000
    17             (Base Construction Allocation -
    18             $400,000)
    19             (Land Allocation - $50,000)
    20             (Design and Contingencies - $70,000)
    21         (2)  Cherrytree Township, Fairview Road
    22             over Prather Creek, Bridge Replacement        520,000
    23             (Base Construction Allocation -
    24             $400,000)
    25             (Land Allocation - $50,000)
    26             (Design and Contingencies - $70,000)
    27     (b)  State Bridges
    28         (1)  SR 0027 over Pine Creek Branch,
    29             Oilcreek Township, Bridge Replacement         600,000
    30             (Base Construction Allocation -
    20030H2167B2938                 - 74 -     

     1             $400,000)
     2             (Land Allocation - $50,000)
     3             (Design and Contingencies - $150,000)
     4         (2)  SR 0322, Thirteenth Street Bridge,
     5             City of Franklin, Bridge
     6             Rehabilitation                              2,500,000
     7             (Base Construction Allocation -
     8             $2,000,000)
     9             (Land Allocation - $300,000)
    10             (Design and Contingencies - $200,000)
    11         (3)  SR 3012, Cemetery Road over
    12             Brokenstraw Creek, Spring Creek
    13             Township, Bridge Replacement                  590,000
    14             (Base Construction Allocation -
    15             $560,000)
    16             (Land Allocation - $30,000)
    17  Section 66.  Warren County.
    18     (a)  Local Bridges (Reserved)
    19     (b)  State Bridges
    20         (1)  SR 0062, Irvine Street over Allegheny
    21             River and Road, Brokenstraw and
    22             Pleasant Townships, Bridge
    23             Rehabilitation                                491,000
    24             (Base Construction Allocation -
    25             $411,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $70,000)
    28         (2)  SR 0027 over Little Brokenstraw Creek,
    29             Pittsfield Township, Bridge
    30             Replacement                                 1,350,000
    20030H2167B2938                 - 75 -     

     1             (Base Construction Allocation -
     2             $1,200,000)
     3             (Land Allocation - $50,000)
     4             (Design and Contingencies - $100,000)
     5         (3)  T-551, Kidder Road over Little
     6             Brokenstraw Creek, Freehold Township,
     7             Bridge Replacement                            459,000
     8             (Base Construction Allocation -
     9             $453,000)
    10             (Land Allocation - $6,000)
    11  Section 67.  Washington County.
    12     (a)  Local Bridges (Reserved)
    13     (b)  State Bridges
    14         (1)  SR 2008 over Daniels Run, North
    15             Bethlehem Township, Bridge Replacement        915,000
    16             (Base Construction Allocation -
    17             $750,000)
    18             (Land Allocation - $40,000)
    19             (Design and Contingencies - $125,000)
    20         (2)  SR 2018, Charleroi Monessen Bridge,
    21             Charleroi Borough, Bridge
    22             Rehabilitation                                915,000
    23             (Base Construction Allocation -
    24             $550,000)
    25             (Land Allocation - $115,000)
    26             (Design and Contingencies - $250,000)
    27  Section 68.  Wayne County.
    28     (a)  Local Bridges
    29         (1)  Scott Township, T-738 over Balls
    30             Creek, Bridge Rehabilitation                  212,000
    20030H2167B2938                 - 76 -     

     1             (Base Construction Allocation -
     2             $182,000)
     3             (Design and Contingencies - $30,000)
     4         (2)  Paupack Township, T-367 over Middle
     5             Creek, Bridge Replacement                   1,290,000
     6             (Base Construction Allocation -
     7             $900,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $380,000)
    10     (b)  State Bridges
    11         (1)  SR 0006 over Lackawaxen River,
    12             Honesdale Borough, Bridge
    13             Rehabilitation                                260,000
    14             (Base Construction Allocation -
    15             $180,000)
    16             (Design and Contingencies - $80,000)
    17         (2)  TR 191 over Tributary of Wallenpaupack
    18             Creek, Dreher Township, Bridge
    19             Replacement                                   261,000
    20             (Base Construction Allocation -
    21             $201,000)
    22             (Land Allocation - $20,000)
    23             (Design and Contingencies - $40,000)
    24         (3)  TR 191 over Big Brook Creek, Oregon
    25             Township, Bridge Replacement                  500,000
    26             (Base Construction Allocation -
    27             $400,000)
    28             (Land Allocation - $20,000)
    29             (Design and Contingencies - $80,000)
    30         (4)  TR 247 over West Branch of Dyberry
    20030H2167B2938                 - 77 -     

     1             Creek, Mt. Pleasant Township, Bridge
     2             Replacement                                   421,000
     3             (Base Construction Allocation -
     4             $334,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $67,000)
     7         (5)  TR 371 over West Branch of Lackawaxen
     8             River, Mt. Pleasant Township, Bridge
     9             Replacement                                   771,000
    10             (Base Construction Allocation -
    11             $626,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $125,000)
    14         (6)  TR 371 over North Branch of Calkins
    15             Creek, Damascus Township, Bridge
    16             Replacement                                   532,000
    17             (Base Construction Allocation -
    18             $427,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $85,000)
    21         (7)  TR 670 over Cramer Creek, Mt. Pleasant
    22             Township, Bridge Replacement                  727,000
    23             (Base Construction Allocation -
    24             $589,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $118,000)
    27         (8)  SR 1004 over Outlet of Beach Lake,
    28             Berlin Township, Bridge Replacement           244,000
    29             (Base Construction Allocation -
    30             $187,000)
    20030H2167B2938                 - 78 -     

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $37,000)
     3         (9)  SR 1004 over Calkins Creek, Damascus
     4             Township, Bridge Replacement                1,236,000
     5             (Base Construction Allocation -
     6             $1,013,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $203,000)
     9         (10)  SR 1006 over Branch of Peggy Run,
    10             Berlin Township, Bridge Replacement         1,236,000
    11             (Base Construction Allocation -
    12             $1,013,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $203,000)
    15         (11)  SR 1008 over Tributary of Delaware
    16             River, Damascus Township, Bridge
    17             Replacement                                   244,000
    18             (Base Construction Allocation -
    19             $187,000)
    20             (Land Allocation - $20,000)
    21             (Design and Contingencies - $37,000)
    22         (12)  SR 1018 over Tributary of Little
    23             Equinunk Creek No.1, Manchester
    24             Township, Bridge Replacement                  325,000
    25             (Base Construction Allocation -
    26             $254,000)
    27             (Land Allocation - $20,000)
    28             (Design and Contingencies - $51,000)
    29         (13)  SR 1018 over Branch to Little
    30             Equinunk Creek No.2, Manchester
    20030H2167B2938                 - 79 -     

     1             Township, Bridge Replacement                  436,000
     2             (Base Construction Allocation -
     3             $347,000)
     4             (Land Allocation - $20,000)
     5             (Design and Contingencies - $69,000)
     6         (14)  SR 1023 over South Branch of Equinunk
     7             Creek, Manchester Township, Bridge
     8             Replacement                                   789,000
     9             (Base Construction Allocation -
    10             $641,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $128,000)
    13         (15)  SR 2002 over Spinner Brook, Paupack
    14             Township, Bridge Replacement                  502,000
    15             (Base Construction Allocation -
    16             $402,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $80,000)
    19         (16)  SR 2007 over Hobert Creek, Berlin
    20             Township, Bridge Replacement                  692,000
    21             (Base Construction Allocation -
    22             $560,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $112,000)
    25         (17)  SR 3020 over Outlet of Lake
    26             Quinsigamund, South Canaan Township,
    27             Bridge Replacement                            644,000
    28             (Base Construction Allocation -
    29             $520,000)
    30             (Land Allocation - $20,000)
    20030H2167B2938                 - 80 -     

     1             (Design and Contingencies - $104,000)
     2         (18)  SR 3024 over Middle Creek, Cherry
     3             Ridge Township, Bridge Replacement          2,504,000
     4             (Base Construction Allocation -
     5             $1,120,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $1,364,000)
     8         (19)  SR 3024 over Collins Brook, Cherry
     9             Ridge Township, Bridge Replacement            404,000
    10             (Base Construction Allocation -
    11             $320,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $64,000)
    14         (20)  SR 3028 over Outlet of Reining Pond,
    15             Cherry Ridge Township, Bridge
    16             Replacement                                   339,000
    17             (Base Construction Allocation -
    18             $266,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $53,000)
    21         (21)  SR 3028 over Branch of Middle Creek,
    22             Paupack and Palmyra Townships, Bridge
    23             Replacement                                   448,000
    24             (Base Construction Allocation -
    25             $357,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $71,000)
    28         (22)  SR 3031 over Wangaum Brook, Cherry
    29             Ridge Township, Bridge Replacement            452,000
    30             (Base Construction Allocation -
    20030H2167B2938                 - 81 -     

     1             $360,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $72,000)
     4         (23)  SR 4001 over Van Auken Creek, Clinton
     5             Township, Bridge Replacement                  553,000
     6             (Base Construction Allocation -
     7             $444,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $89,000)
    10         (24)  SR 4002 over Tributary of Keen's
    11             Pond, Clinton Township, Bridge
    12             Replacement                                   213,000
    13             (Base Construction Allocation -
    14             $161,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $32,000)
    17         (25)  SR 4003 over Branch of Lackawaxen
    18             River, Dyberry Township, Bridge
    19             Replacement                                   340,000
    20             (Base Construction Allocation -
    21             $270,000)
    22             (Land Allocation - $20,000)
    23             (Design and Contingencies - $50,000)
    24         (26)  SR 4004 over Outlet of White Oak
    25             Pond, Clinton Township, Bridge
    26             Replacement                                   520,000
    27             (Base Construction Allocation -
    28             $430,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $70,000)
    20030H2167B2938                 - 82 -     

     1         (27)  SR 4006 over Dyberry Creek, Dyberry
     2             Township, Bridge Replacement                1,108,000
     3             (Base Construction Allocation -
     4             $907,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $181,000)
     7         (28)  SR 4029 over Outlet of Miller Pond,
     8             Mt. Pleasant Township, Bridge
     9             Replacement                                   470,000
    10             (Base Construction Allocation -
    11             $380,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $70,000)
    14         (29)  SR 4031 over Branch of Johnson Creek,
    15             Mt. Pleasant Township, Bridge
    16             Replacement                                   436,000
    17             (Base Construction Allocation -
    18             $347,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $69,000)
    21         (30)  SR 4031 over Johnson Creek, Mt.
    22             Pleasant Township, Bridge Replacement         325,000
    23             (Base Construction Allocation -
    24             $254,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $51,000)
    27         (31)  SR 4033 over Lake Como, Buckingham
    28             Township, Bridge Replacement                  430,000
    29             (Base Construction Allocation -
    30             $340,000)
    20030H2167B2938                 - 83 -     

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $70,000)
     3         (32)  SR 4033 over Outlet of Lower Twin
     4             Lake, Buckingham Township, Bridge
     5             Replacement                                   480,000
     6             (Base Construction Allocation -
     7             $380,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $80,000)
    10         (33)  SR 4043 over Branch of Oquaga Creek,
    11             Scott Township, Bridge Replacement            428,000
    12             (Base Construction Allocation -
    13             $340,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $68,000)
    16         (34)  I-380 Northbound over Lehigh River,
    17             Lehigh Township, Bridge Replacement         4,463,000
    18             (Base Construction Allocation -
    19             $3,703,000)
    20             (Land Allocation - $20,000)
    21             (Design and Contingencies - $741,000)
    22         (35)  I-380 Southbound over Lehigh River,
    23             Lehigh Township, Bridge Replacement         4,464,000
    24             (Base Construction Allocation -
    25             $3,703,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $741,000)
    28         (36)  SR 0652 over Delaware River, Damascus
    29             Township, Bridge Replacement                8,556,000
    30             (Base Construction Allocation -
    20030H2167B2938                 - 84 -     

     1             $7,113,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $1,423,000)
     4  Section 69.  Westmoreland County.
     5     (a)  Local Bridges
     6         (1)  Salem Township, T-612, Rock Springs
     7             Road over Beaver Run, Bridge
     8             Rehabilitation                                 74,500
     9             (Base Construction Allocation -
    10             $60,000)
    11             (Land Allocation - $2,000)
    12             (Design and Contingencies - $12,500)
    13         (2)  Salem Township, T-728, Hoffman Heights
    14             Road over Porter Run, Bridge
    15             Rehabilitation                                 78,000
    16             (Base Construction Allocation -
    17             $61,000)
    18             (Land Allocation - $2,000)
    19             (Design and Contingencies - $15,000)
    20         (3)  City of Greensburg, Alley No.1 over
    21             Jacks Run, Bridge Replacement               1,160,000
    22             (Base Construction Allocation -
    23             $750,000)
    24             (Land Allocation - $110,000)
    25             (Design and Contingencies - $300,000)
    26         (4)  City of Greensburg, Brewery Street
    27             Bridge over Jacks Run Creek, Bridge
    28             Replacement                                 1,160,000
    29             (Base Construction Allocation -
    30             $750,000)
    20030H2167B2938                 - 85 -     

     1             (Land Allocation - $110,000)
     2             (Design and Contingencies - $300,000)
     3         (5)  Derry Township, T-941 over Stony Run,
     4             Bridge Replacement                            551,000
     5             (Base Construction Allocation -
     6             $300,000)
     7             (Land Allocation - $251,000)
     8         (6)  Unity Township, T-982 over US 30,
     9             Bridge Replacement                          3,540,000
    10             (Base Construction Allocation -
    11             $3,000,000)
    12             (Land Allocation - $40,000)
    13             (Design and Contingencies - $500,000)
    14     (b)  State Bridges
    15         (1)  SR 4019 over Conrail, North Huntingdon
    16             Township, Bridge Replacement                1,170,000
    17             (Base Construction Allocation -
    18             $1,100,000)
    19             (Land Allocation - $70,000)
    20         (2)  SR 1006, Stanton Bridge, Fairfield
    21             Township, Bridge Replacement                  205,000
    22             (Land Allocation - $30,000)
    23             (Design and Contingencies - $175,000)
    24         (3)  SR 3081, Stauffer Run Bridge, East
    25             Huntingdon Township, Bridge
    26             Replacement                                   529,000
    27             (Base Construction Allocation -
    28             $500,000)
    29             (Land Allocation - $9,000)
    30             (Design and Contingencies - $20,000)
    20030H2167B2938                 - 86 -     

     1         (4)  SR 0981 over Meadow Run, East
     2             Huntingdon Township, Bridge
     3             Replacement                                   766,000
     4             (Base Construction Allocation -
     5             $550,000)
     6             (Land Allocation - $36,000)
     7             (Design and Contingencies - $180,000)
     8         (5)  T-616 Maplewood Drive over Beaver Run,
     9             Salem Township, Bridge Replacement            101,000
    10             (Base Construction Allocation -
    11             $79,000)
    12             (Land Allocation - $2,000)
    13             (Design and Contingencies - $20,000)
    14  Section 70.  Wyoming County.
    15     (a)  Local Bridges
    16         (1)  Noxen Township, T-327 over Beaver Run
    17             Creek, Bridge Replacement                     520,000
    18             (Base Construction Allocation -
    19             $300,000)
    20             (Land Allocation - $60,000)
    21             (Design and Contingencies - $160,000)
    22         (2)  Noxen Township, T-337 over Beaver
    23             Creek, Bridge Replacement                     520,000
    24             (Base Construction Allocation -
    25             $300,000)
    26             (Land Allocation - $60,000)
    27             (Design and Contingencies - $160,000)
    28         (3)  Monroe Township, T-337 over Leonards
    29             Creek, Bridge Replacement                     610,000
    30             (Base Construction Allocation -
    20030H2167B2938                 - 87 -     

     1             $400,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $200,000)
     4         (4)  North Branch Township, T-423 over
     5             North Branch Mehoopany Creek, Bridge
     6             Replacement                                   610,000
     7             (Base Construction Allocation -
     8             $400,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $200,000)
    11         (5)  Falls Township, T-373 over Buttermilk
    12             Creek, Bridge Replacement                     610,000
    13             (Base Construction Allocation -
    14             $400,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $200,000)
    17     (b)  State Bridges
    18         (1)  SR 0087 over Susquehanna River,
    19             Mehoopany Township, Bridge
    20             Rehabilitation                                375,000
    21             (Base Construction Allocation -
    22             $375,000)
    23         (2)  SR 0006 over Branch of Meshoppen
    24             Creek, Meshoppen Township, Bridge
    25             Replacement                                   810,000
    26             (Base Construction Allocation -
    27             $660,000)
    28             (Land Allocation - $20,000)
    29             (Design and Contingencies - $130,000)
    30         (3)  SR 0029 over Bowmans Creek, Noxen
    20030H2167B2938                 - 88 -     

     1             Township, Bridge Replacement                  860,000
     2             (Base Construction Allocation -
     3             $700,000)
     4             (Land Allocation - $20,000)
     5             (Design and Contingencies - $140,000)
     6         (4)  SR 0092 over Oxbow Creek, Lemon
     7             Township, Bridge Replacement                  450,000
     8             (Base Construction Allocation -
     9             $360,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $70,000)
    12         (5)  SR 0292 over Marsh Creek,
    13             Northmoreland Township, Bridge
    14             Replacement                                   660,000
    15             (Base Construction Allocation -
    16             $530,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $110,000)
    19         (6)  SR 0292 over Whitelock Creek, Exeter
    20             Township, Bridge Replacement                  440,000
    21             (Base Construction Allocation -
    22             $350,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $70,000)
    25         (7)  SR 1001 over Billings Mill Creek
    26             Bridge, Tunkhannock Township, Bridge
    27             Replacement                                   420,000
    28             (Base Construction Allocation -
    29             $330,000)
    30             (Land Allocation - $20,000)
    20030H2167B2938                 - 89 -     

     1             (Design and Contingencies - $70,000)
     2         (8)  SR 1001 over Outlet of Lake Carey,
     3             Tunkhannock Township, Bridge
     4             Replacement                                   620,000
     5             (Base Construction Allocation -
     6             $500,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $100,000)
     9         (9)  SR 1007 over Outlet to Stevens Lake,
    10             Lemon Township, Bridge Replacement            430,000
    11             (Base Construction Allocation -
    12             $340,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $70,000)
    15         (10)  SR 1008 over Horton Creek, Lemon
    16             Township, Bridge Replacement                  260,000
    17             (Base Construction Allocation -
    18             $200,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $40,000)
    21         (11)  SR 1009 over Oxbow Creek, Lemon
    22             Township, Bridge Replacement                  660,000
    23             (Base Construction Allocation -
    24             $530,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $110,000)
    27         (12)  SR 1010 over Tunkhannock Creek,
    28             Clinton Township, Bridge Replacement        2,420,000
    29             (Base Construction Allocation -
    30             $2,000,000)
    20030H2167B2938                 - 90 -     

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $400,000)
     3         (13)  SR 2001 over South Run Creek, Monroe
     4             Township, Bridge Replacement                  490,000
     5             (Base Construction Allocation -
     6             $390,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $80,000)
     9         (14)  SR 2002 over South Run, Monroe
    10             Township, Bridge Replacement                  530,000
    11             (Base Construction Allocation -
    12             $430,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $80,000)
    15         (15)  SR 2005 over Branch of Whitelock
    16             Creek, Northmoreland Township, Bridge
    17             Replacement                                   280,000
    18             (Base Construction Allocation -
    19             $180,000)
    20             (Land Allocation - $20,000)
    21             (Design and Contingencies - $80,000)
    22         (16)  SR 2007 over Bowmans Creek, Eaton
    23             Township, Bridge Replacement                2,830,000
    24             (Base Construction Allocation -
    25             $2,340,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $470,000)
    28         (17)  SR 2008 over Outlet of Falls Creek,
    29             Falls Township, Bridge Replacement            190,000
    30             (Base Construction Allocation -
    20030H2167B2938                 - 91 -     

     1             $140,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $30,000)
     4         (18)  SR 2011 over Whitelock Creek,
     5             Northmoreland Township, Bridge
     6             Replacement                                   500,000
     7             (Base Construction Allocation -
     8             $400,000)
     9             (Land Allocation - $20,000)
    10             (Design and Contingencies - $80,000)
    11         (19)  SR 2012 over Tributary of Tunkhannock
    12             Creek, Clinton Township, Bridge
    13             Replacement                                   452,000
    14             (Base Construction Allocation -
    15             $360,000)
    16             (Land Allocation - $20,000)
    17             (Design and Contingencies - $72,000)
    18         (20)  SR 2018 over Leonard Creek, Monroe
    19             Township, Bridge Replacement                  229,000
    20             (Base Construction Allocation -
    21             $174,000)
    22             (Land Allocation - $20,000)
    23             (Design and Contingencies - $35,000)
    24         (21)  SR 2021 over Beaver Creek, Overfield
    25             Township, Bridge Replacement                  244,000
    26             (Base Construction Allocation -
    27             $187,000)
    28             (Land Allocation - $20,000)
    29             (Design and Contingencies - $37,000)
    30         (22)  SR 2031 over Outlet of Lake Winola,
    20030H2167B2938                 - 92 -     

     1             Overfield Township, Bridge Replacement        398,000
     2             (Base Construction Allocation -
     3             $315,000)
     4             (Land Allocation - $20,000)
     5             (Design and Contingencies - $63,000)
     6         (23)  SR 2033 over South Branch of
     7             Tunkhannock Creek, Factoryville
     8             Borough, Bridge Replacement                 1,695,000
     9             (Base Construction Allocation -
    10             $1,396,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $279,000)
    13         (24)  SR 3001 over Tributary of Susquehanna
    14             River, Windham Township, Bridge
    15             Replacement                                   440,000
    16             (Base Construction Allocation -
    17             $350,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $70,000)
    20         (25)  SR 3001 over Roaring Brook, Windham
    21             Township, Bridge Replacement                  410,000
    22             (Base Construction Allocation -
    23             $320,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $70,000)
    26         (26)  SR 3002 over Stone Run, Noxen
    27             Township, Bridge Replacement                  380,000
    28             (Base Construction Allocation -
    29             $300,000)
    30             (Land Allocation - $20,000)
    20030H2167B2938                 - 93 -     

     1             (Design and Contingencies - $60,000)
     2         (27)  SR 3002 over Hettesheimer Run, Noxen
     3             Township, Bridge Replacement                  270,000
     4             (Base Construction Allocation -
     5             $210,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $40,000)
     8         (28)  SR 4002 over Little Mehoopany Creek,
     9             Mehoopany Township, Bridge Replacement        380,000
    10             (Base Construction Allocation -
    11             $300,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $60,000)
    14         (29)  SR 4006 over Little Tuscorora Creek,
    15             Laceyville Borough, Bridge Replacement        350,000
    16             (Base Construction Allocation -
    17             $270,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $60,000)
    20         (30)  SR 4007 over Branch of Mehoopany
    21             Creek, Mehoopany Township, Bridge
    22             Replacement                                   350,000
    23             (Base Construction Allocation -
    24             $270,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $60,000)
    27         (31)  SR 1001 over Tunkhannock Creek,
    28             Tunkhannock Township, Bridge
    29             Replacement                                   271,000
    30             (Base Construction Allocation -
    20030H2167B2938                 - 94 -     

     1             $209,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $42,000)
     4         (32)  SR 0087 over Susquehanna River and
     5             Railroad, Mehoopany Township, Bridge
     6             Replacement                                22,881,000
     7             (Base Construction Allocation -
     8             $19,860,000)
     9             (Land Allocation - $20,000)
    10             (Design and Contingencies - $3,001,000)
    11         (33)  SR 0107, Delaware and Hudson Railroad
    12             over SR 0107, Clinton Township, Bridge
    13             Replacement                                   510,000
    14             (Base Construction Allocation -
    15             $440,000)
    16             (Land Allocation - $5,000)
    17             (Design and Contingencies - $65,000)
    18         (34)  SR 3001 over Branch of Susquehanna
    19             River, Windham Township, Bridge
    20             Painting                                       60,000
    21             (Base Construction Allocation -
    22             $50,000)
    23             (Design and Contingencies - $10,000)
    24         (35)  SR 3003 over Sugar Hollow Creek,
    25             Eaton Township, Bridge Replacement            550,000
    26             (Base Construction Allocation -
    27             $200,000)
    28             (Land Allocation - $150,000)
    29             (Design and Contingencies - $200,000)
    30  Section 71.  York County.
    20030H2167B2938                 - 95 -     

     1     (a)  Local Bridges
     2         (1)  Manchester Township, Baker Road over
     3             Little Conewago Creek, Bridge
     4             Replacement                                   545,000
     5             (Base Construction Allocation -
     6             $250,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $275,000)
     9         (2)  Spring Garden Township, Tri-Hill Road
    10             Bridge over Tyler Run, Bridge
    11             Replacement                                   545,000
    12             (Base Construction Allocation -
    13             $250,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $275,000)
    16         (3)  Heidelberg Township, Gitts Run Road
    17             over Oil Creek, Bridge Rehabilitation         585,000
    18             (Base Construction Allocation -
    19             $250,000)
    20             (Land Allocation - $35,000)
    21             (Design and Contingencies - $300,000)
    22         (4)  Carrol Township, Old Gettysburg Pike
    23             over Yellow Breeches Creek, Bridge
    24             Rehabilitation                                585,000
    25             (Base Construction Allocation -
    26             $250,000)
    27             (Land Allocation - $35,000)
    28             (Design and Contingencies - $300,000)
    29         (5)  North Hopewell Township, Cherry Street
    30             over Tributary of Codorus Creek, Bridge
    20030H2167B2938                 - 96 -     

     1             Replacement                                   225,000
     2             (Base Construction Allocation -
     3             $177,000)
     4             (Land Allocation - $8,000)
     5             (Design and Contingencies - $40,000)
     6         (6)  Chanceford Township, Mill Road (T-675)
     7             over Otter Creek, Bridge Replacement          242,000
     8             (Base Construction Allocation -
     9             $194,000)
    10             (Land Allocation - $8,000)
    11             (Design and Contingencies - $40,000)
    12         (7)  Monaghan Township, T-892 over Yellow
    13             Breeches Creek, Bridge Replacement            434,000
    14             (Base Construction Allocation -
    15             $386,000)
    16             (Land Allocation - $8,000)
    17             (Design and Contingencies - $40,000)
    18         (8)  Chanceford Township, T-675 over Otter
    19             Creek, Bridge Replacement                     232,000
    20             (Base Construction Allocation -
    21             $184,000)
    22             (Land Allocation - $8,000)
    23             (Design and Contingencies - $40,000)
    24         (9)  Peach Bottom Township, T-595 over
    25             Tributary of Susquehanna River, Bridge
    26             Replacement                                   222,000
    27             (Base Construction Allocation -
    28             $174,000)
    29             (Land Allocation - $8,000)
    30             (Design and Contingencies - $40,000)
    20030H2167B2938                 - 97 -     

     1         (10)  North Hopewell Township, Brogueville
     2             Road over North Branch of Muddy Creek,
     3             Bridge Replacement                            218,000
     4             (Base Construction Allocation -
     5             $172,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $26,000)
     8         (11)  Carroll Township, Old Mill Road over
     9             Dogwood Run, Bridge Replacement               195,000
    10             (Base Construction Allocation -
    11             $150,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $25,000)
    14     (b)  State Bridges
    15         (1)  I-83 over US 30, Manchester Township,
    16             Bridge Rehabilitation                         230,000
    17             (Base Construction Allocation -
    18             $200,000)
    19             (Design and Contingencies - $30,000)
    20         (2)  I-83 over Limekiln Road, Fairview
    21             Township, Bridge Rehabilitation               230,000
    22             (Base Construction Allocation -
    23             $200,000)
    24             (Design and Contingencies - $30,000)
    25         (3)  SR 4038 over Bermudian Creek, Franklin
    26             Township, Bridge Replacement                  920,000
    27             (Base Construction Allocation -
    28             $400,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $500,000)
    20030H2167B2938                 - 98 -     

     1         (4)  SR 2078 over I-83, Shrewsbury
     2             Township, Bridge Replacement                1,255,000
     3             (Base Construction Allocation -
     4             $750,000)
     5             (Land Allocation - $5,000)
     6             (Design and Contingencies - $500,000)
     7         (5)  SR 2074 over I-83, Shrewsbury
     8             Township, Bridge Rehabilitation               750,000
     9             (Base Construction Allocation -
    10             $750,000)
    11         (6)  I-83 over I-76, Fairview Township,
    12             Bridge Rehabilitation                         715,000
    13             (Base Construction Allocation -
    14             $500,000)
    15             (Land Allocation - $15,000)
    16             (Design and Contingencies - $200,000)
    17         (7)  SR 4021 over Conewago Creek, Newberry
    18             Township, Bridge Replacement                1,565,000
    19             (Base Construction Allocation -
    20             $1,035,000)
    21             (Land Allocation - $30,000)
    22             (Design and Contingencies - $500,000)
    23  Section 72.  Statewide (Reserved).
    24  Section 73.  Limitation on expenditure of funds.
    25     Any moneys derived from the incurring of debt shall be used
    26  solely for effecting the rehabilitation, replacement or removal
    27  of bridges located on State highways. All other bridge
    28  rehabilitation, replacement or removal shall be financed from
    29  current revenue.
    30  Section 74.  Debt authorization.
    20030H2167B2938                 - 99 -     

     1     The Governor, Auditor General and State Treasurer are hereby
     2  authorized and directed to borrow from time to time, in addition
     3  to any authorization heretofore or hereafter enacted, on the
     4  credit of the Commonwealth, subject to the limitations provided
     5  in the current capital budget, money not exceeding in the
     6  aggregate the sum of $00,000,000 as may be found necessary to
     7  carry out the acquisition and construction of the State projects
     8  specifically itemized in this act.
     9  Section 75.  Issue of bonds.
    10     The indebtedness authorized in this act shall be incurred
    11  from time to time and shall be evidenced by one or more series
    12  of general obligation bonds of the Commonwealth in such
    13  aggregate principal amount for each series as the Governor,
    14  Auditor General and State Treasurer shall determine, but the
    15  latest stated maturity date shall not exceed 30 years from the
    16  date of the bond first issued for each series.
    17  Section 76.  Estimated useful life of projects.
    18     The General Assembly states the estimated useful life of the
    19  projects itemized in this act as 30 years.
    20  Section 77.  Appropriation.
    21     The net proceeds of the sale of the obligations authorized in
    22  this act are hereby appropriated from the Capital Facilities
    23  Fund to the department in the maximum amount of $00,000,000 to
    24  be used by it exclusively to defray the financial costs of the
    25  State projects specifically itemized in this capital budget.
    26  After reserving or paying the expenses of the sale of the
    27  obligation, the State Treasurer shall pay out to the department
    28  the moneys as required and certified by it to be legally due and
    29  payable.
    30  Section 78.  Federal funds.
    20030H2167B2938                 - 100 -    

     1     In addition to those funds appropriated in section 77, all
     2  moneys received from the Federal Government for the public
     3  improvement projects specifically itemized in this act are also
     4  hereby appropriated for those projects.
     5  Section 79.  Allocation of funds.
     6     (a)  General rule.--Whenever the department or the Department
     7  of Conservation and Natural Resources determines that the full
     8  estimated financial costs of the projects itemized in this act
     9  are not necessary for the proper design, acquisition or
    10  construction of such projects, the excess funds no longer
    11  required may be allocated by the department or the Department of
    12  Conservation and Natural Resources to increase the estimated
    13  costs of any one or more of the projects specifically itemized
    14  in a capital budget.
    15     (b)  Reimbursement of municipal expenditures.--Moneys raised
    16  or expended by municipalities after the effective date of this
    17  act, in anticipation of receipt of funds authorized for projects
    18  itemized by this act, may be reimbursable to those
    19  municipalities.
    20  Section 80.  Policy on jobs and materials.
    21     (a)  Jobs.--It is the declared policy of the Commonwealth
    22  that the construction projects authorized in this act be used,
    23  to the greatest extent possible, to provide for the creation of
    24  jobs and the rehiring of the unemployed in this Commonwealth. In
    25  order to reach this goal, firms with Commonwealth-based
    26  facilities shall be actively solicited to make bids on contracts
    27  to furnish products and materials, including, but not limited
    28  to, steel and steel products, to be used in these projects.
    29     (b)  Materials.--Every contract document entered into to
    30  undertake a project contained in this act shall provide that any
    20030H2167B2938                 - 101 -    

     1  steel or other products to be used or supplied in the
     2  performance of this contract shall be required to be
     3  manufactured by plants in the United States unless the secretary
     4  determines, on a contract by contract basis, that certain
     5  required products are not produced in the United States in
     6  sufficient quantities to meet the requirements of the contract.
     7  Such a determination and the reasons therefor shall be published
     8  in the Pennsylvania Bulletin. Decisions made under this
     9  subsection shall not be inconsistent with the general provisions
    10  of the act of March 3, 1978 (P.L.6, No.3), known as the Steel
    11  Products Procurement Act.
    12     (c)  Minorities and women.--It is also the declared policy of
    13  the Commonwealth to require and encourage substantial
    14  participation by minorities and women in the construction
    15  projects authorized by this act.
    16  Section 81.  Payment of capital debt service.
    17     The repayment of any debt incurred pursuant to this act shall
    18  be made from the account and such repayment shall have first
    19  claim on the revenues of the account.
    20  Section 82.  Authorization and debt cumulation.
    21     The additional authorization and debt allowance provided for
    22  in this act shall be added to the total authorizations and debt
    23  incurred pursuant to the act of December 8, 1982 (P.L.848,
    24  No.235), known as the Highway-Railroad and Highway Bridge
    25  Capital Budget Act for 1982-1983, as amended and supplemented.
    26  Section 83.  Editorial changes.
    27     In editing and preparing this act for printing following the
    28  final enactment, the Legislative Reference Bureau shall insert
    29  or revise letters or numbers for projects where the letters or
    30  numbers are missing or require revision. The bureau shall also
    20030H2167B2938                 - 102 -    

     1  revise the total monetary amounts for the total authorization,
     2  debt authorization, appropriations and departmental totals as
     3  necessary to agree with the total monetary amounts of the
     4  projects.
     5  Section 84.  Repeal (Reserved).
     6  Section 85.  Effective date.
     7     This act shall take effect immediately.
















    J10L86RLE/20030H2167B2938       - 103 -