PRINTER'S NO. 893
No. 835 Session of 1999
INTRODUCED BY SAYLOR, CHADWICK, DRUCE, GORDNER, FLICK, NAILOR, BAKER, BARD, BARRAR, BELARDI, BISHOP, CAWLEY, CLARK, L. I. COHEN, COLAFELLA, CORRIGAN, DALEY, DALLY, FAIRCHILD, FORCIER, GANNON, GODSHALL, GRUCELA, HALUSKA, HARHAI, HENNESSEY, HUTCHINSON, LAUGHLIN, LEH, MAITLAND, MANDERINO, MARKOSEK, MASLAND, McCALL, S. MILLER, MUNDY, NICKOL, PESCI, PIPPY, PLATTS, ROSS, SCHRODER, SCHULER, SEMMEL, SOLOBAY, STABACK, STAIRS, STEIL, STERN, SURRA, E. Z. TAYLOR, TIGUE, TRELLO, TRICH, VAN HORNE, WILLIAMS AND YUDICHAK, MARCH 10, 1999
REFERRED TO COMMITTEE ON EDUCATION, MARCH 10, 1999
AN ACT 1 Amending the act of March 10, 1949 (P.L.30, No.14), entitled "An 2 act relating to the public school system, including certain 3 provisions applicable as well to private and parochial 4 schools; amending, revising, consolidating and changing the 5 laws relating thereto," further providing for approved 6 reimbursable rental for leases hereafter approved and 7 approved reimbursable sinking fund charges on indebtedness. 8 The General Assembly of the Commonwealth of Pennsylvania 9 hereby enacts as follows: 10 Section 1. Section 2574(e) of the act of March 10, 1949 11 (P.L.30, No.14), known as the Public School Code of 1949, 12 amended July 10, 1987 (P.L.286, No.50), is amended and 13 subsections (b) and (c) are amended by adding clauses to read: 14 Section 2574. Approved Reimbursable Rental for Leases 15 Hereafter Approved and Approved Reimbursable Sinking Fund 16 Charges on Indebtedness.--* * *
1 (b) For new school buildings the approved building 2 construction cost shall be the lesser of 3 * * * 4 (4) For school buildings for which the general construction 5 contract is awarded on or after July 1, 1999, the product of the 6 rated pupil capacity as determined by the Department of 7 Education at the time the project is approved and (i) four 8 thousand seven hundred dollars ($4,700) in the case of 9 elementary schools, (ii) six thousand two hundred dollars 10 ($6,200) in the case of secondary schools, (iii) an amount in 11 the case of combined elementary-secondary schools obtained by 12 multiplying the rated elementary pupil capacity by four thousand 13 seven hundred dollars ($4,700) and the rated secondary pupil 14 capacity by six thousand two hundred dollars ($6,200) and 15 dividing the sum by the total rated pupil capacity. 16 (c) For additions or alterations to existing buildings 17 approved building construction cost shall be the lesser of 18 * * * 19 (4) For school buildings for which the general construction 20 contract is awarded on or after July 1, 1999, the difference 21 obtained by subtracting the appraisal value of the existing 22 building from the product of the rated pupil capacity of the 23 altered or expanded building as determined by the Department of 24 Education at the time the project is approved and (i) four 25 thousand seven hundred dollars ($4,700) in the case of 26 elementary schools, (ii) six thousand two hundred dollars 27 ($6,200) in the case of secondary schools, (iii) an amount in 28 the case of combined elementary-secondary schools obtained by 29 multiplying the rated elementary pupil capacity by four thousand 30 seven hundred dollars ($4,700) and the rated secondary pupil 19990H0835B0893 - 2 -
1 capacity by six thousand two hundred dollars ($6,200) and 2 dividing the sum by the total rated pupil capacity of the 3 altered or expanded building. 4 * * * 5 (e) For area vocational-technical school and technical 6 institute projects leased subsequent to July 1, 1964, by or for 7 lease to a board of school directors authorized to operate such 8 a school, the Department of Education shall calculate an 9 approved reimbursable rental charge. 10 For area vocational-technical school and technical institute 11 projects constructed or purchased subsequent to July 1, 1964, by 12 a board of school directors authorized to operate such a school, 13 the Department of Education may calculate an approved 14 reimbursable sinking fund charge. 15 Approved reimbursable rental or sinking fund charge shall 16 consist of that part of the annual rental or sinking fund 17 attributable to: 18 (1) Cost of acquiring land and preparing it for use to the 19 extent that such costs are deemed reasonable by the Department 20 of Education and the interest on such cost of acquisition, cost 21 of preparation and the cost of sewage treatment and the interest 22 on such cost. 23 (2) Machinery, apparatus, furniture and equipment and all 24 other necessary expenses and interest charges, but excluding 25 architects' fees in excess of six percent of the construction 26 cost. 27 The approved building construction cost and the interest on 28 such construction cost shall not exceed the product of the rated 29 full-time pupil capacity, as determined by the Department of 30 Education at the time the project is approved and two thousand 19990H0835B0893 - 3 -
1 two hundred dollars ($2,200). 2 The provisions of the foregoing paragraph shall apply to all 3 school building projects for which the general construction 4 contract is awarded prior to July 1, 1966, and for approved 5 school building projects for which a lease was approved by the 6 Department of Education prior to July 1, 1966. For school 7 buildings for which the general construction contract is awarded 8 subsequent to July 1, 1966, and for approved school building 9 projects for which the general construction contract was awarded 10 but for which a lease was not approved by the Department of 11 Education prior to July 1, 1966, the approved building 12 construction cost and the interest on such construction cost 13 shall not exceed the product of the rated full-time pupil 14 capacity, as determined by the Department of Education at the 15 time the project is approved, and three thousand seven hundred 16 dollars ($3700). 17 For school buildings for which the general construction 18 contract is awarded subsequent to July 1, 1984, and for approved 19 school building projects for which the general construction 20 contract was awarded but for which a lease or general obligation 21 bond resolution was not approved by the Department of Education 22 prior to July 1, 1984, the approved building construction cost 23 and the interest on such construction cost shall not exceed the 24 product of the rated full-time pupil capacity, as determined by 25 the Department of Education at the time the project is approved, 26 and six thousand three hundred dollars ($6,300). 27 For school buildings for which the general construction 28 contract is awarded on or after July 1, 1999, the approved 29 building construction cost and the interest on such construction 30 cost shall not exceed the product of the rated full-time pupil 19990H0835B0893 - 4 -
1 capacity, as determined by the Department of Education at the 2 time the project is approved, and seven thousand six hundred 3 dollars ($7,600). 4 The Department of Education shall not approve the expenditure 5 of any funds borrowed or obtained by the sale of bonds by any 6 authority, nonprofit corporation, profit corporation, company or 7 individual for construction of area vocational-technical schools 8 or technical institutes for bleachers, athletic field, lighting 9 equipment or apparatus used to promote and conduct 10 interscholastic athletics. 11 * * * 12 Section 2. This act shall take effect July 1, 1999. L4L24DMS/19990H0835B0893 - 5 -