HOUSE AMENDED PRIOR PRINTER'S NOS. 182, 389, 439, PRINTER'S NO. 1351 1336, 1348
No. 188 Session of 1997
INTRODUCED BY TILGHMAN, JANUARY 23, 1997
AS AMENDED ON THIRD CONSIDERATION, HOUSE OF REPRESENTATIVES, OCTOBER 1, 1997
A SUPPLEMENT 1 To the act of July 11, 1996 (P.L.595, No.101), entitled "An act 2 providing for the capital budget for the fiscal year 1996- 3 1997," itemizing public improvement projects, furniture and 4 equipment projects, transportation assistance projects, 5 redevelopment assistance and redevelopment assistance capital 6 projects, flood control projects, Keystone Recreation, Park 7 and Conservation projects and forestry bridge projects to be 8 constructed or acquired or assisted by the Department of 9 General Services, the Department of Conservation and Natural 10 Resources, the Department of Environmental Protection, the 11 Department of Community and Economic Development, the 12 Department of Transportation, the Pennsylvania Fish and Boat 13 Commission or the Pennsylvania Game Commission, together with 14 their estimated financial costs; authorizing the incurring of 15 debt without the approval of the electors for the purpose of 16 financing the projects to be constructed or acquired or 17 assisted by the Department of General Services, the 18 Department of Conservation and Natural Resources, the 19 Department of Environmental Protection, the Department of 20 Community and Economic Development or the Department of 21 Transportation; stating the estimated useful life of the 22 projects; authorizing certain waivers; making appropriations; 23 and making repeals. 24 The General Assembly of the Commonwealth of Pennsylvania 25 hereby enacts as follows: 26 Section 1. Short title.
1 This act shall be known and may be cited as the Capital 2 Budget Project Itemization Act for 1996-1997. 3 Section 2. Total authorizations. 4 (a) Public improvements.--The total authorization for the 5 additional capital projects in the category of public 6 improvement projects itemized in section 3 and to be acquired or 7 constructed by the Department of General Services, its 8 successors or assigns, and to be financed by the incurring of 9 debt, shall be $1,773,210,000 $2,139,205,000 $2,358,345,000 <-- 10 $2,378,345,000. <-- 11 (b) Furniture and equipment.--The total authorization for 12 the additional capital projects in the category of public 13 improvement projects consisting of the acquisition of original 14 movable furniture and equipment to complete public improvement 15 projects itemized in section 4 and to be acquired by the 16 Department of General Services, its successors or assigns, and 17 to be financed by the incurring of debt, shall be $52,677,000 <-- 18 $56,390,000 $54,390,000. <-- 19 (c) Transportation assistance.--The total authorization for 20 the capital projects in the category of transportation 21 assistance projects itemized in section 5 with respect to which 22 an interest is to be acquired in or constructed by the 23 Department of Transportation, its successors or assigns, and to 24 be financed by the incurring of debt, shall be $540,881,000 <-- 25 $942,866,000 $952,633,000 $958,633,000. <-- 26 (d) Redevelopment assistance.--The total authorization for 27 the additional capital projects in the category of redevelopment 28 assistance and redevelopment assistance capital projects 29 itemized in section 6 for capital grants by the Department of 30 Community and Economic Development, its successors or assigns, 19970S0188B1351 - 2 -
1 and to be financed by the incurring of debt, shall be 2 $1,012,098,000 $2,414,531,000 $2,526,774,000 $2,527,774,000. <-- 3 (e) Flood control.--The total authorization for the capital 4 projects in the category of flood control projects itemized in 5 section 7 and to be constructed by the Department of 6 Environmental Protection, its successors or assigns, and to be 7 financed by the incurring of debt, shall be $25,456,000 <-- 8 $122,241,000 $122,741,000. <-- 9 (f) Keystone Recreation, Park and Conservation.--The total 10 authorization for the capital projects in the category of 11 Keystone Recreation, Park and Conservation projects itemized in 12 section 8 and to be constructed by the Department of 13 Conservation and Natural Resources, its successors or assigns, 14 and to be financed from revenues in the Keystone Recreation, 15 Park and Conservation Fund shall be $15,150,000 $34,580,000@ <-- 16 $39,860,000 $40,360,000. <-- 17 (g) Game Fund projects.--The total authorization for the 18 capital projects in the category of public improvement projects 19 itemized in section 9 to be acquired by the Pennsylvania Game 20 Commission and to be financed from current revenues of the Game 21 Fund pursuant to executive authorizations shall be $5,000,000. 22 (h) Fish and Boat Fund projects.--The total authorization 23 for the capital projects in the category of public improvement 24 projects itemized in section 10 to be acquired or developed by 25 the Pennsylvania Fish and Boat Commission and to be financed 26 from current revenues of the Boat Fund and the Fish Fund 27 pursuant to executive authorization shall be $6,380,000 <-- 28 $10,080,000 $11,520,000. <-- 29 Section 3. Itemization of public improvement projects. 30 Additional capital projects in the category of public 19970S0188B1351 - 3 -
1 improvement projects to be constructed or acquired by the 2 Department of General Services, its successors or assigns, and 3 to be financed by the incurring of debt, are hereby itemized, 4 together with their respective estimated financial costs, as 5 follows: 6 Total 7 Project 8 Project Allocation 9 (1) Department of Agriculture $12,397,000 10 (i) Department of Agriculture Headquarters 11 (A) Construction of a headhouse and 12 greenhouse addition including a covered 13 walkway to connect all structures 392,000 14 (Base Project Allocation - $327,000) 15 (Design and Contingencies - $65,000) 16 (ii) Farm Show Complex 17 (A) Removal of piping and ducting which 18 contain asbestos materials and/or 19 encapsulation of asbestos containing 20 materials in Large Arena 785,000 21 (Base Project Allocation - $654,000) 22 (Design and Contingencies - $131,000) 23 (B) Reconstruction of roof system 24 including supporting joists, framing, 25 decking, asbestos abatement and 26 exterior materials involving 455,000 27 square feet over all main exhibition 28 areas. Project must be fully evaluated 29 regarding feasibility and costs of 30 alternatives to reconstructing the 19970S0188B1351 - 4 -
1 existing design before implementation 9,000,000 2 (Base Project Allocation - $7,500,000) 3 (Design and Contingencies - $1,500,000) 4 (C) Conversion of one existing boiler to a 5 gas/oil fired unit to allow flexible 6 operations at lower pressures 420,000 7 (Base Project Allocation - $350,000) 8 (Design and Contingencies - $70,000) 9 (D) Exterior cleaning, sealing and 10 reconstruction of masonry walls and 11 decorative friezes of main building 1,800,000 12 (Base Project Allocation - $1,500,000) 13 (Design and Contingencies - $300,000) 14 (2) Department of Community and Economic <-- 15 Development $150,500,000 16 (2) DEPARTMENT OF COMMUNITY AND ECONOMIC <-- 17 DEVELOPMENT $16,549,000 18 (2) DEPARTMENT OF COMMUNITY AND ECONOMIC <-- 19 DEVELOPMENT $198,549,000 20 (I) PHILADELPHIA AREA <-- 21 (A) CONVERSION OF THE FORMER PHILADELPHIA 22 NAVY YARD 182,000,000 23 (i) (II) Port of Philadelphia <-- 24 (A) Construction of a cruise ship 25 facility 2,000,000 26 (ii) David L. Lawrence Convention Center <-- 27 (A) Expansion of convention center 145,000,000 28 (iii) Pittsburgh's north shore 29 (A) Construction of a passenger pier 30 terminal 1,000,000 19970S0188B1351 - 5 -
1 (II) (III) PORT OF PITTSBURGH <-- 2 (A) CONSTRUCTION OF A PASSENGER PIER 3 TERMINAL ON PITTSBURGH'S NORTH SHORE 1,000,000 4 (III) (IV) PORT OF ERIE <-- 5 (A) STATE STREET PIER CONSTRUCTION AND 6 RENOVATION 1,000,000 7 (IV) (V) LACKAWANNA COUNTY <-- 8 (A) BOROUGH OF THROOP, PURCHASE AND 9 INSTALLATION OF TRAFFIC CONTROL DEVICES 10 ON UNDERWOOD ROAD 11,000 11 (BASE PROJECT ALLOCATION - $9,000) 12 (DESIGN AND CONTINGENCIES - $2,000) 13 (V) (VI) GREENE COUNTY <-- 14 (A) NEMACOLIN INDUSTRIAL PARK - PHASE I 15 SITE DEVELOPMENT, ENVIRONMENTAL 16 ASSESSMENT AND CLEAN-UP AND 17 IMPROVEMENTS TO PORT FACILITIES 10,000,000 18 (iv) (VI) (VII) Somerset County, Summit <-- 19 Township 20 (A) Relocation of approximately 46 houses 21 out of the flood plain of the Casselman 22 River across the river from the Borough 23 of Meyersdale 2,500,000 24 (VII) (VIII) SHAWNEE PARK FIELD, CITY OF <-- 25 MONESSEN, WESTMORELAND COUNTY 26 (A) ERECTION OF LIGHTS 38,000 27 (BASE PROJECT ALLOCATION - $30,000) 28 (DESIGN AND CONTINGENCIES - $8,000) 29 (3) Department of Conservation and Natural <-- 30 Resources $25,568,000 19970S0188B1351 - 6 -
1 (3) DEPARTMENT OF CONSERVATION AND NATURAL <-- 2 RESOURCES $81,175,000 3 (I) CHAPMAN DAM STATE PARK 4 (A) FLOOD DAMAGE REPAIRS, RENOVATIONS AND 5 PROVIDE INCREASED HANDICAPPED 6 ACCESSIBILITY 550,000 7 (i) (II) Cowans Gap State Park <-- 8 (A) Day-use upgrade 300,000 9 (B) Repair dam control tower and gate 10 valve 700,000 11 (C) Sewage treatment plant upgrade 200,000 12 (III) LACKAWANNA STATE PARK <-- 13 (A) CONSTRUCTION OF IMPROVEMENTS AND 14 ADDITIONAL AMENITIES 200,000 15 (IV) LEHIGH GORGE STATE PARK 16 (A) PARK IMPROVEMENTS 2,925,000 17 (BASE PROJECT ALLOCATION - $2,500,000) 18 (DESIGN AND CONTINGENCIES - $425,000) 19 (B) INTERPRETIVE FACILITIES AND TRAIL 20 CONSTRUCTION 3,225,000 21 (BASE PROJECT ALLOCATION - $2,750,000) 22 (DESIGN AND CONTINGENCIES - $475,000) 23 (C) LAND ACQUISITION 2,500,000 24 (ii) (V) Nescopeck State Park <-- 25 (A) Park development, construction of 26 comfort stations, pavilions, warming 27 huts, roadways, parking lots and 28 utilities in the main, middle and lower 29 day use areas 2,000,000 30 (B) Development of cabin area, 19970S0188B1351 - 7 -
1 construction of ten rustic cabins, 2 including roads, utilities and site 3 development 1,500,000 4 (C) Development of overnight camping area, 5 construction of campground to include 6 site development, bath houses, living 7 areas, roads, overflow parking and 8 utilities 1,500,000 9 (iii) (VI) Oil Creek State Park <-- 10 (A) Rehabilitation and enlargement of 11 train station 100,000 12 (B) Design, production and installation of 13 exhibits 201,000 14 (iv) (VII) Presque Isle State Park <-- 15 (A) Waterworks reservoir area - Phase II 950,000 16 (B) Rehabilitation of park roadways 1,760,000 17 (C) Rehabilitation of water mains serving 18 park 2,610,000 19 (D) State share of the cost of 20 replenishing the sand on the lake side 21 shore 650,000 22 (Base Project Allocation - $650,000) 23 (E) Beach nourishment and breakwater 24 maintenance 5,800,000 25 (F) Rehabilitation of comfort facilities 26 and sewage system 1,800,000 27 (G) Rehabilitation of Presque Isle Marina 962,000 28 (v) (VIII) Prince Gallitzen State Park <-- 29 (A) Additional funds for DGS 195-37, 30 rehabilitate marina, Phase III, 19970S0188B1351 - 8 -
1 construct bulkhead to protect area from
2 erosion 1,500,000
3 (Base Project Allocation - $1,250,000)
4 (Design and Contingencies - $250,000)
5 (IX) PYMATUNING STATE PARK <--
6 (A) LINESVILLE SPILLWAY IMPROVEMENTS 2,407,000
7 (BASE PROJECT ALLOCATION - $2,012,000)
8 (DESIGN AND CONTINGENCIES - $395,000)
9 (X) RACCOON CREEK STATE PARK
10 (A) RENOVATION OF CABINS, AMPHITHEATER AND
11 BATHROOMS 1,500,000
12 (BASE PROJECT ALLOCATION - $1,250,000)
13 (DESIGN AND CONTINGENCIES - $250,000)
14 (B) RENOVATION OF WATER AND SEWAGE
15 SYSTEMS 2,000,000
16 (BASE PROJECT ALLOCATION - $1,666,000)
17 (DESIGN AND CONTINGENCIES - $334,000)
18 (C) DEVELOPMENT OF NEW PICNIC AND LAUNCH
19 AREA ON ROUTE 18 1,000,000
20 (D) CAMPGROUND, MAIN PICNIC AREA, PAVILION
21 BUILDINGS AND OTHER STRUCTURES,
22 ELECTRICITY PROJECT 800,000
23 (vi) (XI) Shawnee State Park <--
24 (A) Additional funds for DGS 155-11,
25 replacement of two bridges on main park
26 road 900,000
27 (B) Replace lift station 80,000
28 (C) Construct rental cabins and support
29 facilities 1,500,000
30 (D) Rehabilitate water plant roof and
19970S0188B1351 - 9 -
1 filters 140,000
2 (XII) SWATARA STATE PARK <--
3 (A) RAUSCH CREEK ACID MINE DRAINAGE
4 TREATMENT PLANT, ADDITIONAL TREATMENT
5 UNITS AND CHEMICAL FEEDING EQUIPMENT TO
6 ACCOMMODATE INCREASED WATER FLOW DUE TO
7 THE DIVERSION OF WATER FROM THE SWATARA
8 CREEK TO THE RAUSCH CREEK 4,500,000
9 (BASE PROJECT ALLOCATION - $3,800,000)
10 (DESIGN AND CONTINGENCIES - $700,000)
11 (vii) (XIII) Tyler State Park <--
12 (A) Rehabilitation of Schofield/Ford
13 Covered Bridge 250,000
14 (XIV) MEADOWCROFT ROCK SHELTER, AVELLA <--
15 (A) RENOVATION OF VISITORS' ACCESS AND
16 EXHIBIT DEVELOPMENT 2,000,000
17 (BASE PROJECT ALLOCATION - $1,750,000)
18 (DESIGN AND CONTINGENCIES - $250,000)
19 (XV) ALLEGHENY, WESTMORELAND, FAYETTE AND
20 SOMERSET COUNTIES
21 (A) ACQUISITION AND DEVELOPMENT OF THE
22 PITTSBURGH TO WASHINGTON, D.C., TRAIL 10,000,000
23 (XVI) BLAIR COUNTY
24 (A) ACQUISITION AND DEVELOPMENT AS A TRAIL
25 THE NEW PORTAGE RAILROAD AND
26 HOLLIDAYSBURG & PETERSBURG BRANCH OF
27 THE FORMER PENNSYLVANIA RAILROAD FROM
28 WILLIAMSBURG TO GALLITZIN, CAMBRIA
29 COUNTY 9,000,000
30 (XVII) SOMERSET COUNTY
19970S0188B1351 - 10 -
1 (A) REHABILITATION OF THE BIG SAVAGE 2 TUNNEL AND RELATED STRUCTURES 6,000,000 3 (viii) (XVIII) Borough of Ashley <-- 4 (A) Chester area of Solomon's Creek and 5 Bobby Strish Park Association, 6 enhancement to the trout fishing and 7 picnic areas along Solomon's Creek, 8 rehabilitation and/or construction of a 9 baseball and softball field, concession 10 stands, restroom facilities and parking 11 lot 165,000 12 (XIX) HARBORCREEK TOWNSHIP, ERIE COUNTY <-- 13 (A) SHADES BEACH PARK DEVELOPMENT 6,000,000 14 (XX) GULICH TOWNSHIP, CLEARFIELD COUNTY 15 (A) FACILITIES IMPROVEMENTS AT MOUNTY 16 MEMORIAL PARK 1,000,000 17 (4) Department of Corrections $247,844,000 <-- 18 (4) DEPARTMENT OF CORRECTIONS $251,850,000 <-- 19 (i) State Correctional Institution - Coal 20 Township, Northumberland County 21 (A) Addition of three modular units for 22 inmate housing 27,600,000 23 (Base Project Allocation - $23,000,000) 24 (Design and Contingencies - $4,600,000) 25 (ii) State Correctional Institution - Dallas 26 (A) Reconstruction of three boilers, 27 installation of new controls, 28 reconstruction of support structures 29 and associated fuel handling equipment 5,640,000 30 (Base Project Allocation - $4,700,000) 19970S0188B1351 - 11 -
1 (Design and Contingencies - $940,000) 2 (iii) State Correctional Institution - 3 Graterford 4 (A) Construction of a Level 2 housing 5 unit, including dormitories, 50 double 6 rooms, offices, sanitary facilities, 7 multi-purpose room, laundry and storage 8 areas 5,340,000 9 (Base Project Allocation - $4,450,000) 10 (Design and Contingencies - $890,000) 11 (B) Upgrade perimeter security including 12 additional lighting for both sides of 13 perimeter wall, electrified fence 14 inside perimeter and electronic 15 monitoring at three sally ports 5,456,000 16 (Base Project Allocation - $4,547,000) 17 (Design and Contingencies - $909,000) 18 (iv) State Correctional Institution - 19 Greensburg 20 (A) Upgrade electric utility system 2,400,000 21 (Base Project Allocation - $2,000,000) 22 (Design and Contingencies - $400,000) 23 (v) State Correctional Institution - Mercer 24 (A) Expansion of kitchen/dining, 25 administration and program facilities 26 along with utilities including water, 27 sewer and electric 6,000,000 28 (Base Project Allocation - $5,000,000) 29 (Design and Contingencies - $1,000,000) 30 (B) Construction of a Level 2 housing 19970S0188B1351 - 12 -
1 unit, including dormitories, 50 double 2 rooms, offices, sanitary facilities, 3 multi-purpose room, laundry and storage 4 areas 5,340,000 5 (Base Project Allocation - $4,450,000) 6 (Design and Contingencies - $890,000) 7 (vi) State Correctional Institution - Muncy 8 (A) Addition of two new cell blocks for 9 close security, expansion of infirmary, 10 outside warehouse, electrical and 11 boiler upgrades 26,364,000 12 (Base Project Allocation - $21,970,000) 13 (Design and Contingencies - $4,394,000) 14 (vii) State Correctional Institution - 15 Pittsburgh 16 (A) Rehabilitation of boiler plant 17 components including combustion control 18 system, stokers on boilers 4 and 5, 19 emergency generator, ash removal system 20 and building components 3,120,000 21 (Base Project Allocation - $2,600,000) 22 (Design and Contingencies - $520,000) 23 (viii) State Correctional Institution - 24 Rockview 25 (A) Construction of a Level 2 housing 26 unit, including dormitories, 50 double 27 rooms, offices, sanitary facilities, 28 multi-purpose room, and laundry and 29 storage areas. Also renovations to the 30 kitchen and dining rooms and 19970S0188B1351 - 13 -
1 improvements to the perimeter security 2 and intrusion detection system 8,994,000 <-- 3 (Base Project Allocation - $7,495,000) 4 (Design and Contingencies - $1,499,000) 5 AND INTRUSION DETECTION SYSTEM 13,000,000 <-- 6 (BASE PROJECT ALLOCATION - $10,800,000) 7 (DESIGN AND CONTINGENCIES - $2,200,000) 8 (ix) State Correctional Institution - Western 9 Pennsylvania 10 (A) Additional funds for DGS 575-3, to 11 provide for expansion to 750 beds 16,110,000 12 (Base Project Allocation - $13,425,000) 13 (Design and Contingencies - $2,685,000) 14 (x) New State Correctional Institution - 15 Western Pennsylvania ALLEGHENY COUNTY <-- 16 WESTERN PENNSYLVANIA <-- 17 (A) Construction of a new close-security 18 institution in western portion of the <-- 19 State ALLEGHENY COUNTY with capacity of <-- 20 INSTITUTION WITHIN A 50-MILE RADIUS OF <-- 21 THE EXISTING INSTITUTION WITH CAPACITY 22 OF approximately 1,236 cells. Includes 23 construction of all other facilities as 24 necessary to operate institution 135,480,000 25 (Base Project Allocation - 26 $105,984,000) 27 (Land Allocation - $3,000,000) 28 (Design and Contingencies - 29 $26,496,000) 30 (5) Department of Education $391,022,000 <-- 19970S0188B1351 - 14 -
1 (5) DEPARTMENT OF EDUCATION $444,472,000 <-- 2 (5) DEPARTMENT OF EDUCATION $446,472,000 <-- 3 (i) The Pennsylvania State University 4 (A) University Park Campus 5 (I) Classroom building - Phase II 12,100,000 6 (II) Renovation of Willard Building 10,300,000 7 (III) Renovation of Moore and Sparks 8 Buildings 16,070,000 9 (IV) Library Depository Facility 11,000,000 10 (V) Renovation of Engineering Units 11 and Sackett Building 8,600,000 12 (VI) Renovation of Chandlee 13 Laboratory 10,200,000 14 (VII) Renovation of Whitmore and Davey 15 Laboratories 10,200,000 16 (VIII) BORLAND LABORATORY ADDITION, <-- 17 RENOVATIONS 12,000,000 18 (IX) CONSTRUCTION OF NEW FORESTRY 19 BUILDING 9,000,000 20 (X) CONSTRUCTION OF A VISITORS CENTER 2,000,000 21 (BASE PROJECT ALLOCATION - $1,500,000) 22 (DESIGN AND CONTINGENCIES - $500,000) 23 (XI) CAPITAL RENEWAL FOR BUILDINGS AND 24 BUILDING SYSTEMS; UNIVERSITY PARK 20,000,000 25 (B) Altoona Campus 26 (I) Construct Multistory Classroom 27 Facility 7,000,000 <-- 28 FACILITY 8,000,000 <-- 29 (II) CONSTRUCTION OF NEW MULTIPURPOSE 30 ACTIVITY BUILDING 4,750,000 19970S0188B1351 - 15 -
1 (C) Capital HARRISBURG Campus <-- 2 (I) Construct academic activities 3 building 3,750,000 4 (D) DuBois Campus 5 (I) Addition to and renovation of 6 Smeal Building 1,700,000 7 (E) Great Valley Center 8 (I) Addition to building 8,000,000 9 (F) Mont Alto 10 (I) Renovation of General Studies 11 Building 3,200,000 12 (G) MCKEESPORT CAMPUS <-- 13 (I) DESIGN AND CONSTRUCT STUDENT 14 UNION/MULTIPURPOSE BUILDING 1,400,000 15 (G) (H) York Campus <-- 16 (I) Construct library addition and 17 classroom building addition 11,900,000 18 (H) (I) The Behrend College <-- 19 (I) Construction of a research and 20 development center 30,000,000 21 (II) Renovation of Otto Behrend 22 Building 3,100,000 23 (III) Restoration of Erie Hall 1,800,000 24 (IV) Maintenance of Police and Safety 25 Building 1,800,000 26 (ii) University of Pittsburgh 27 (A) Oakland Campus 28 (I) Upgrade and deferred maintenance 29 for buildings and building systems 30 Phase I 12,000,000 19970S0188B1351 - 16 -
1 (II) Upgrade and deferred maintenance 2 for buildings and building systems 3 Phase II 12,000,000 4 (III) Additional funds for DGS 1103- 5 48, Convocation/Events Center 25,000,000 6 (IV) Renovation of Trees Hall and 7 Fitzgerald Field House Phase I 11,300,000 8 (V) Renovation of the Cathedral of 9 Learning 20,000,000 10 (VI) Additional Funds for Hillman 11 Library Renovation Phase II 9,600,000 12 (VII) Acquisition of Bellefield Tower 13 for WPIC Children and Family 14 Programming 8,000,000 15 (VIII) Construction of Basic Sciences 16 Complex 25,000,000 17 (B) Bradford Campus 18 (I) Communications, Art and Technology 19 Building 15,800,000 20 (C) Johnstown Campus 21 (I) Additional funds for DGS 1103-53, 22 classroom/administration building 532,000 23 (II) Additional funds for Library 24 renovations 1,580,000 25 (iii) Temple University 26 (A) Main Campus 27 (I) Installation of an Electronic 28 access/intrusion detection system 29 at main campus 8,411,000 30 (Base Project Allocation - $7,009,000) 19970S0188B1351 - 17 -
1 (Design and Contingencies - $1,402,000) 2 (II) Rehabilitation of lecture halls: 3 Barton, Beury, Speakman, Ritter 4,900,000 4 (III) Roofing replacement and repairs: 5 Presser, Gladfelter, Anderson 6 Classroom, Anderson Engineering and 7 Architecture, Paley, Bio-Life, 8 Physical Plant, Computer, 9 Tomlinson, Weiss, Sullivan, 10 Conwell, Thomas, Student Activities 11 Center, Tyler Hall, Mitten, 12 Speakman, 1900 Block Park Mall, 13 Bright Hall, Dixon and Widener 4,410,000 14 (IV) Tomlinson Theater rehabilitation 15 and addition 5,049,000 16 (V) Mitten Hall renovation for 17 performance hall 8,820,000 18 (VI) Rehabilitation of building system 19 components: Curtis, Barton, Eeury, 20 Biolife Sciences 15,000,000 21 (VII) College Hall Renovations - Phase 22 II 850,000 23 (VIII) Additional funds for DGS 1104- 24 57, emergency fire and safety 25 renovations, Phase II, to address 26 complexities revealed by initial 27 surveys within buildings on main 28 campus to enable university to 29 comply with fire codes 2,900,000 30 (Base Project Allocation - 19970S0188B1351 - 18 -
1 $2,417,000) 2 (Design and Contingencies - 3 $483,000) 4 (IX) Additional funds for DGS 1104-53, 5 Classroom and Laboratory Building 3,000,000 6 (B) Ambler Campus 7 (I) Education/learning technology 8 center 7,200,000 9 (C) Various Campuses 10 (I) Masonry, sidewalk and walkway 11 repairs: Paley, Thomas, Ritter, 12 Ritter Annex, Computer, Sullivan, 13 Klein, Curtis Speakman, Bio-Life, 14 Barton, Beury, Pearson/McGonigle, 15 Mitten, Johnson/Hardwick, Peabody, 16 FSUB, Old Dental, Engineering and 17 Architecture, Student Activities 18 Center, Kresge, Tyler, Dixon, 19 Widener, Park Mall, Berks Mall 7,812,000 20 (II) Telecommunications infrastructure 21 improvements 8,100,000 22 (III) Deferred maintenance and energy 23 conservation: Bio-Life, Beury, 24 Tomlinson, Medical Research, 25 Medical School 4,474,000 26 (IV) Computing and data 27 communications 6,907,000 28 (D) All Campuses 29 (I) Fluorescent lighting retrofit 3,749,000 30 (iv) Lincoln University 19970S0188B1351 - 19 -
1 (A) Construction of storm water drainage 2 system including piping and a detention 3 basin to prevent hydraulic overload of 4 the sewer system 1,084,000 5 (Base Project Allocation - $903,000) 6 (Design and Contingencies - $181,000) 7 (v) Thaddeus Stevens State School of 8 Technology 9 (A) Construction of a multi-purpose 10 activities center and rehabilitation 11 and renovation of the existing 12 gymnasium for a trade-technical 13 laboratory 5,000,000 14 (B) Repair and rebuild underground utility 15 tunnel system and repair masonry 16 retaining wall adjacent to Stevens 17 Avenue 350,000 18 (C) Upgrade of high voltage electrical 19 distribution system 180,000 20 (Base Project Allocation - $150,000) 21 (Design and Contingencies - $30,000) 22 (D) Reconstruct and separate storm water 23 and sewer conduit systems 1,080,000 24 (Base Project Allocation - $900,000) 25 (Design and Contingencies - $180,000) 26 (vi) Scranton State School for the Deaf 27 (A) Reconstruction of roof system on 28 O'Donnell Building 214,000 29 (Base Project Allocation - $178,000) 30 (Design and Contingencies - $36,000) 19970S0188B1351 - 20 -
1 (B) CAMPUS SAFETY AND GROUNDS <-- 2 IMPROVEMENTS 2,300,000 3 (BASE PROJECT ALLOCATION - $1,920,000) 4 (DESIGN AND CONTINGENCIES - $380,000) 5 (VII) READING AREA COMMUNITY COLLEGE 6 (A) NEW COMPUTERS FOR THE HISTORY AND 7 POLITICAL SCIENCE DEPARTMENT 1,000,000 8 (VIII) ALLEGHENY UNIVERSITY OF THE HEALTH <-- 9 SCIENCES 10 (A) CONSTRUCTION OF A FACILITY TO HOUSE A 11 BACCALAUREATE PROGRAM IN EMERGENCY 12 MEDICAL SERVICES AND SUPPORTIVE 13 TRAINING FACILITIES 2,000,000 14 (6) Department of Environmental Protection $28,147,000 <-- 15 (6) DEPARTMENT OF ENVIRONMENTAL PROTECTION $87,176,000 <-- 16 (6) DEPARTMENT OF ENVIRONMENTAL PROTECTION $98,066,000 <-- 17 (i) Allegheny County 18 (A) Greenwald Road Flood Control Project 19 DGS 184-20 2,000,000 20 (B) Additional funds for DGS 184-20, 21 culverts and debris basin along 22 tributary to Grassers Run, Bethel Park 1,080,000 23 (Base Project Allocation - $900,000) 24 (Design and Contingencies - $180,000 25 (C) Additional funds for DGS 184-18, 26 construction of levee, floodplain 27 excavation and concrete retaining wall 28 along Pine Creek, Shaler Township 360,000 29 (Base Project Allocation - $300,000) 30 (Design and Contingencies - $60,000) 19970S0188B1351 - 21 -
1 (ii) Armstrong County 2 (A) Reconstruction of valves and seals at 3 the Ernest deep mine complex, Rayne 4 Township 654,000 5 (Base Project Allocation - $545,000) 6 (Design and Contingencies - $109,000) 7 (III) BEAVER COUNTY <-- 8 (A) BEAVER RIVER SILT CONTROL AND 9 PREVENTION PROGRAM 500,000 10 (iii) (IV) Bedford County <-- 11 (A) Borough of Hyndman, flood protection 12 project 3,000,000 13 (Base Project Allocation - $2,500,000) 14 (Design and Contingencies - $500,000) 15 (iv) (V) Berks County <-- 16 (A) Replacement of the Felix Dam 17 Construction of a new reinforced 18 concrete dam 3,900,000 19 (Base Construction Allocation - 20 $3,300,000) 21 (Design and Contingencies - $600,000) 22 (VI) BLAIR COUNTY <-- 23 (A) MILL RUN CREEK FLOOD PROTECTION 24 PROJECT, CITY OF ALTOONA, LOGAN AND 25 ALLEGHENY TOWNSHIPS 5,874,000 <-- 26 (BASE PROJECT ALLOCATION - $5,574,000) 27 (DESIGN AND CONTINGENCIES - $300,000) 28 ALLEGHENY TOWNSHIPS 11,224,000 <-- 29 (v) (VII) Bradford County <-- 30 (A) Rehabilitation of Sayre Flood Control 19970S0188B1351 - 22 -
1 Project by reconstructing interceptor
2 drainage system beneath levee 600,000
3 (Base Project Allocation - $500,000)
4 (Design and Contingencies - $100,000)
5 (vi) (VIII) Bucks County <--
6 (A) Flood control and storm water
7 management, Phase I affecting Bristol
8 Borough and Bristol, Falls and
9 Middletown Townships 350,000
10 (IX) BUTLER COUNTY <--
11 (A) CONTINUATION OF SULLIVAN RUN
12 STREAMBANK STABILIZATION PROJECT IN
13 CITY OF BUTLER 500,000
14 (B) STORM WATER PROJECTS IN BUTLER
15 TOWNSHIP 750,000
16 (C) ACQUISITION OF BUTLER CDC WATER SYSTEM
17 AND CONSTRUCTION OF STORAGE TANK,
18 PUMPING STATION AND INSTALLATION OF
19 MAINS 3,975,000
20 (X) CAMBRIA COUNTY
21 (A) FLOOD CONTROL - SEPARATION OF COMBINED
22 SEWERS AND INTERCEPTOR CAPACITY
23 IMPROVEMENTS IN CITY OF JOHNSTOWN 1,200,000
24 (B) WEST END FLOOD IMPROVEMENTS IN THE
25 CITY OF JOHNSTOWN 5,000,000
26 (XI) CLEARFIELD COUNTY
27 (A) MORRIS TOWNSHIP, IMPROVEMENTS TO WATER
28 DISTRIBUTION SYSTEM NEAR WEST DECATUR 500,000
29 (B) BOGGS TOWNSHIP, IMPROVEMENTS TO WATER
30 DISTRIBUTION SYSTEM NEAR SALEM AREA 500,000
19970S0188B1351 - 23 -
1 (C) BOGGS TOWNSHIP, IMPROVEMENTS TO WATER 2 DISTRIBUTION SYSTEM IN SPRING VALLEY- 3 BIGLER AREA 500,000 4 (D) BRADFORD TOWNSHIP, IMPROVEMENTS TO 5 WATER DISTRIBUTION SYSTEM NEAR BIGLER 500,000 6 (E) BRADFORD TOWNSHIP, IMPROVEMENTS TO 7 WATER DISTRIBUTION SYSTEM NEAR 8 MILLSTONE AREA 500,000 9 (F) DECATUR TOWNSHIP, IMPROVEMENTS TO 10 WATER DISTRIBUTION SYSTEM NEAR MOCK 11 HILL 500,000 12 (G) DECATUR TOWNSHIP, IMPROVEMENTS TO 13 WATER DISTRIBUTION SYSTEM NEAR PLEASANT 14 HILL 500,000 15 (H) DECATUR TOWNSHIP, IMPROVEMENTS TO 16 WATER DISTRIBUTION SYSTEM NEAR DRANE 17 HILL 500,000 18 (I) WOODWARD TOWNSHIP, IMPROVEMENTS TO 19 WATER DISTRIBUTION SYSTEM NEAR SANBOURN 20 AREA 500,000 21 (J) GRAHAM TOWNSHIP, IMPROVEMENTS AND 22 EXTENSIONS TO WATER DISTRIBUTION 23 SYSTEM 2,000,000 24 (K) PIKE TOWNSHIP, IMPROVEMENTS AND 25 REHABILITATION OF SEWAGE TREATMENT 26 FACILITIES 1,000,000 27 (L) OSCEOLA MILLS BOROUGH, FLOOD CONTROL 28 PROJECT TO INCLUDE REPAIR OF THE 29 CULVERT BOX FOR THE COMPLETE LENGTH OF 30 THE CANAL 3,000,000 19970S0188B1351 - 24 -
1 (BASE PROJECT ALLOCATION - $2,500,000)
2 (DESIGN AND CONTINGENCIES - $500,000)
3 (vii) (XII) Fayette County <--
4 (A) Additional funds for DGS 180-23,
5 construction of retaining walls and
6 culverts and excavation to widen or
7 deepen Dunbar Creek and Gist Run
8 channel in Dunbar 396,000
9 (Base Project Allocation - $330,000)
10 (Design and Contingencies - $66,000)
11 (XIII) LACKAWANNA COUNTY <--
12 (A) FUNDS FOR DGS 184-22 PHASE II FLOOD
13 CONTROL PROJECT ON MEADOWBROOK CREEK,
14 CITY OF SCRANTON AND BOROUGH OF
15 DUNMORE 6,200,000
16 (BASE PROJECT ALLOCATION - $5,000,000)
17 (DESIGN AND CONTINGENCIES - $1,200,000)
18 (B) FUNDS FOR DGS 184-22 FLOOD CONTROL
19 PROJECT ON LEGGETTS CREEK, CITY OF
20 SCRANTON 4,800,000
21 (BASE PROJECT ALLOCATION - $4,000,000)
22 (DESIGN AND CONTINGENCIES - $800,000)
23 (C) FUNDS FOR DGS 184-22 FLOOD CONTROL
24 PROJECT ON KEYSER CREEK, CITY OF
25 SCRANTON 4,800,000
26 (BASE PROJECT ALLOCATION - $4,000,000)
27 (DESIGN AND CONTINGENCIES - $800,000)
28 (D) FUNDS FOR DGS 184-22 FLOOD CONTROL
29 PROJECT ON LUCKY-RUN CREEK, CITY OF
30 SCRANTON 2,400,000
19970S0188B1351 - 25 -
1 (BASE PROJECT ALLOCATION - $2,000,000) 2 (DESIGN AND CONTINGENCIES - $400,000) 3 (E) FUNDS FOR DGS 184-22 FLOOD CONTROL 4 PROJECT ON LEACH CREEK, CITY OF 5 SCRANTON 2,400,000 6 (BASE PROJECT ALLOCATION - $2,000,000) 7 (DESIGN AND CONTINGENCIES - $400,000) 8 (F) STREAM RESTORATION OF SCOTT CREEK IN <-- 9 DICKSON CITY BOROUGH 800,000 10 (G) RUSHBROOK CREEK PROJECT IN JERMYN 11 BOROUGH 4,500,000 12 (viii) (XIV) Lebanon County <-- 13 (A) Additional funds for Project DGS 182- 14 12 located on Hazel Dyke Flood Control 15 Project 480,000 16 (Base Project Allocation - $400,000) 17 (Design and Contingencies - $80,000) 18 (ix) (XV) Luzerne County <-- 19 (A) Construction of compact earth levee in 20 area of Fox Hill in Plains Township 21 including grass covered channel 240,000 22 (Base Project Allocation - $200,000) 23 (Design and Contingencies - $40,000) 24 (B) FLOOD WALL IMPROVEMENT PROJECT, <-- 25 NEWPORT CREEK, NEWPORT TOWNSHIP 240,000 26 (x) (XVI) Montgomery County <-- 27 (A) Additional funds for DGS 181-7, 28 Plymouth Creek improvement, Borough of 29 Conshohocken 240,000 30 (Base Project Allocation - $200,000) 19970S0188B1351 - 26 -
1 (Design and Contingencies - $40,000) 2 (B) SANDY RUN DRAINAGE SHED FLOOD CONTROL <-- 3 IMPROVEMENTS 6,000,000 4 (xi) (XVII) Northumberland County <-- 5 (A) Bank stabilization and reconstruction 6 for Sunbury Flood Project 1,440,000 7 (Base Project Allocation - $1,200,000) 8 (Design and Contingencies - $240,000) 9 (xii) (XVIII) Tioga County <-- 10 (A) Borough of Knoxville, flood protection 11 project 5,100,000 12 (Base Project Allocation - $4,250,000) 13 (Design and Contingencies - $850,000) 14 (XIX) WARREN COUNTY <-- 15 (A) VARIOUS FLOOD PROTECTION PROJECTS 2,500,000 16 (XX) WESTMORELAND COUNTY 17 (A) REHABILITATION OF THE GREATER 18 GREENSBURG AREA FLOOD PROTECTION 19 PROJECT, SOUTH GREENSBURG BOROUGH AND 20 HEMPFIELD TOWNSHIP 1,620,000 21 (BASE PROJECT ALLOCATION - $1,350,000) 22 (DESIGN AND CONTINGENCIES - $270,000) 23 (xiii) (XXI) York County <-- 24 (A) City of York, Spring Garden Township 25 and York Township, Tyler Run Flood 26 Control Project 2,500,000 27 (B) Spring Garden Township, Springettsbury 28 Township and York Township, Mill Creek 29 Flood Control Project 5,000,000 30 (C) Fairview Township, Flood Mitigation 19970S0188B1351 - 27 -
1 Project, relating to Meadowbrook Pump 2 Station 50,000 3 (D) Franklintown Borough, flood control 4 project relating to storm water 5 management 367,000 6 (E) Yoe Borough and York Township, 7 construction of retention basins on 8 Mill Creek between Locust Avenue in 9 York Township and Boundary Avenue in 10 Yoe Borough 400,000 11 (7) Department of General Services $226,613,000 <-- 12 (7) DEPARTMENT OF GENERAL SERVICES $406,873,000 <-- 13 (7) DEPARTMENT OF GENERAL SERVICES $428,873,000 <-- 14 (i) Capitol Complex 15 (A) Upgrade chillers and humidification 16 systems at the State Museum and 17 Archives Buildings 720,000 18 (Base Project Allocation - $600,000) 19 (Design and Contingencies - $120,000) 20 (B) Additional funds for DGS 948-37, 21 expansion of central air conditioning 22 system to Main Capitol, including 23 funding to make the appropriate 24 connections, remove the current chiller 25 system and provide heating and cooling 26 throughout 12,000,000 27 (Base Project Allocation - $10,000,000) 28 (Design and Contingencies - $2,000,000) 29 (C) Additional funds for Project No. DGS 30 948-35, Fire Safety Code Improvements, 19970S0188B1351 - 28 -
1 Capitol Complex to continue the fire 2 safety improvements to the Capitol 3 Building, North and South Office 4 Buildings, Forum, Finance Building, 5 Health and Welfare Building and Labor 6 and Industry Building, including 7 upgrading electrical system for code 8 conformance, abatement of hazardous 9 materials affecting construction, 10 temporary relocation of occupants from 11 construction areas (including new 12 furniture and equipment needed for 13 temporary arrangement) re-routing data, 14 communication and other systems in 15 alignment with fire safety power and 16 lighting improvements and 17 replacement/restoration of finishes in 18 areas modified by fire safety 19 improvements, for Phase I and 20 subsequent phases 138,750,000 21 (Base Project Allocation - 22 $111,000,000) 23 (Design and Contingencies - 24 $27,750,000) 25 (D) Additional funding for Project No. DGS 26 946-2, renovation and conversion of Old 27 Museum Building for legislative offices 28 for the repair and restoration of the 29 Old Museum Building to include the 30 plaza on the west face of the building, 19970S0188B1351 - 29 -
1 security lighting at basement driveway, 2 restoration and modern replication of 3 historic light fixtures with UL labels 4 and miscellaneous renovation and 5 restoration consistent with the 6 intended purpose 3,000,000 <-- 7 (Base Project Allocation - $2,400,000) 8 (Design and Contingencies - $600,000) 9 INTENDED PURPOSE 9,660,000 <-- 10 (BASE PROJECT ALLOCATION - $8,050,000) 11 (DESIGN AND CONTINGENCIES - $1,610,000) 12 (E) Repair and renovation of the Capitol 13 Complex to provide for the repair of 14 exterior walks, railings and exterior 15 site improvements, the renovation of 16 the Capitol basement and fifth floor 17 corridors, the repair and installation 18 of new catwalks, the renovation of 19 public restrooms, the repair and 20 upgrading of the plumbing system 21 including the chilled drinking water 22 system; the replacement of the East 23 Wing parametric boards and upgraded 24 HVAC direct digital control including 25 Central Plant and all associated 26 buildings, and the upgrade of power and 27 lighting in Central Plant and service 28 tunnels to the Capitol and associated 29 buildings 14,000,000 30 (Base Project Allocation - $11,200,000) 19970S0188B1351 - 30 -
1 (Design and Contingencies - $2,800,000) 2 (F) Additional funding for Project No. DGS 3 948-34, repair and restoration work for 4 statuaries and north, south and center 5 porticoes and plaza level entries of 6 the Capitol Building to continue the 7 repair and restoration of the masonry 8 to the porches and porticoes of the 9 Capitol Building 1,000,000 10 (Base Project Allocation - $800,000) 11 (Design and Contingencies - $200,000) 12 (G) Additional funds for DGS 948-9, 13 renovation of the Finance Building 5,203,000 14 (Base Project Allocation - $4,336,000) 15 (Design and Contingencies - $867,000) 16 (H) Acoustical improvements at The Forum 3,000,000 17 (Base Project Allocation - $2,600,000) 18 (Design and Contingencies - $400,000) 19 (I) Restoration of ceiling and wall murals 20 at The Forum 1,490,000 21 (J) Upgrade fire alarm and security 22 systems in the State Museum and 23 Archives Buildings 700,000 24 (Base Project Allocation - $600,000) 25 (Design and Contingencies - $100,000) 26 (K) Upgrade and installation of new fire 27 suppression system in the State Museum 28 and Archives Buildings 1,875,000 29 (Base Project Allocation - $1,500,000) 30 (Design and Contingencies - $375,000) 19970S0188B1351 - 31 -
1 (L) Upgrade electrical distribution system 2 in the State Museum and Archives 3 Buildings 4,750,000 4 (Base Project Allocation - $3,800,000) 5 (Design and Contingencies - $950,000) 6 (M) Repair compression joints and 7 stabilize exterior cladding on Museum 8 Building 1,000,000 9 (Base Project Allocation - $800,000) 10 (Design and Contingencies - $200,000) 11 (N) Upgrade HVAC systems including 12 installation of humidification and 13 filtration equipment in the State 14 Museum and Archives Buildings 5,000,000 15 (Base Project Allocation - $4,000,000) 16 (Design and Contingencies - $1,000,000) 17 (O) Roof replacement State Museum 18 Building 1,500,000 19 (Base Project Allocation - $1,200,000) 20 (Design and Contingencies - $300,000) 21 (P) Asbestos abatement in the State Museum 22 and Archives Buildings 1,000,000 23 (Base Project Allocation - $800,000) 24 (Design and Contingencies - $200,000) 25 (Q) Upgrade elevator and escalator systems 26 in the State Museum Building 1,250,000 27 (Base Project Allocation - $1,000,000) 28 (Design and Contingencies - $250,000) 29 (R) Reconstruction of roof and clean, seal 30 and resecure exterior stone panels and 19970S0188B1351 - 32 -
1 doors at the State Museum and Archives 2 Building 600,000 3 (Base Project Allocation - $500,000) 4 (Design and Contingencies - $100,000) 5 (S) Upgrade windows and clean, seal and 6 caulk exterior of State Finance 7 Building 6,600,000 8 (Base Project Allocation - $5,500,000) 9 (Design and Contingencies - $1,100,000) 10 (T) Upgrade windows and exterior door 11 enclosures in Labor and Industry 12 Building 5,280,000 13 (Base Project Allocation - $4,400,000) 14 (Design and Contingencies - $880,000) 15 (U) Upgrade windows and entrance doors and 16 clean and seal exterior granite at 17 Health and Welfare Building 4,600,000 18 (Base Project Allocation - $4,000,000) 19 (Design and Contingencies - $600,000) 20 (V) ADDITIONAL FUNDING FOR PROJECT NO. DGS <-- 21 948-36, WATERPROOFING OF MAIN CAPITOL, 22 FOR CONSTRUCTION ON STAGING, HOISTS, 23 CRANES AND SCAFFOLDING, ADDITIONAL 24 PARKING, RESTORATION OF LANDSCAPING AND 25 GROUNDS DISRUPTED BY CONSTRUCTION AT 26 THE CAPITOL RESTORATION AND CLEANING OF 27 MASONRY AND MISCELLANEOUS REPAIRS 28 CONSISTENT WITH THE INTENDED PURPOSE 3,900,000 29 (BASE PROJECT ALLOCATION - $3,300,000) 30 (DESIGN AND CONTINGENCIES - $600,000) 19970S0188B1351 - 33 -
1 (ii) Farm Show Complex 2 (A) Upgrade exterior waterproof membrane, 3 repoint and reset masonry and upgrade 4 entrance doors at the Agriculture 5 Building 518,000 6 (Base Project Allocation - $450,000) 7 (Design and Contingencies - $68,000) 8 (iii) Public Works Complex 9 (A) Reconstruction of exterior masonry and 10 resealing of the exterior of the 11 Arsenal Building and reconstruction of 12 roof on former ammunition bunker now 13 used as an archive 150,000 14 (Base Project Allocation - $125,000) 15 (Design and Contingencies - $25,000) 16 (iv) Governor's Residence 17 (A) Upgrade the heating, ventilating and 18 air-conditioning system 127,000 19 (Base Project Allocation - $110,000) 20 (Design and Contingencies - $17,000) 21 (V) PHILADELPHIA STATE OFFICE BUILDING <-- 22 (A) ADDITIONAL FUNDING FOR PROJECT NO. DGS 23 943-6, IMPROVEMENTS TO THE PHILADELPHIA 24 STATE OFFICE BUILDING, FOR THE REPAIR 25 AND REPLACEMENT OF THE HEATING, 26 VENTILATION AND AIR CONDITIONING 27 EQUIPMENT AND SYSTEM COMPONENTS TO 28 BRING THE BUILDING INTO COMPLIANCE WITH 29 OCCUPANCY CODES, INCLUDING HAZARDOUS 30 MATERIAL ABATEMENT AND REPLACEMENT OF 19970S0188B1351 - 34 -
1 FINISHES AND BUILDING ELEMENTS 2 NECESSARY TO ACHIEVE THE HVAC 3 IMPROVEMENTS 19,200,000 4 (BASE PROJECT ALLOCATION - $16,000,000) 5 (DESIGN AND CONTINGENCIES - $3,200,000) 6 (VI) SUMMERDALE LABORATORY COMPLEX 7 (A) BASIC INFRASTRUCTURE AND SITE 8 DEVELOPMENT FOR THE LABORATORY COMPLEX 9 IN SUMMERDALE, CUMBERLAND COUNTY 5,000,000 10 (VII) COGENERATION; TRASH TO STEAM AND <-- 11 ELECTRICAL ENERGY RECYCLING FACILITY TO BE 12 LOCATED ON THE GROUNDS OF THE NEW 13 CORRECTIONAL INSTITUTION IN WESTERN 14 PENNSYLVANIA 22,000,000 15 (BASE PROJECT ALLOCATION - $18,333,000) 16 (DESIGN AND CONTINGENCIES - $3,667,000) 17 (v) (VII) (VIII) Warner Theater, Erie County <-- 18 (A) Conversion of the theater into a 19 performing arts center including 20 additions to the stage area, 21 improvements to mechanical systems and 22 installation of elevators 7,000,000 23 (Base Project Allocation - $5,833,000) 24 (Design and Contingencies - $1,167,000) 25 (B) ERIE CIVIC CENTER, LOUIS J. TULLIO <-- 26 CONVENTION ARENA 500,000 27 (vi) (viii) (IX) Pennsylvania PUBLIC Law <-- 28 Center, Allegheny County 29 (A) Acquisition and construction 5,500,000 30 (IX) (X) DAVID L. LAWRENCE CONVENTION CENTER <-- 19970S0188B1351 - 35 -
1 (A) EXPANSION OF CONVENTION CENTER 145,000,000 2 (8) Historical and Museum Commission $2,955,000 <-- 3 (8) HISTORICAL AND MUSEUM COMMISSION $32,156,000 <-- 4 (8) HISTORICAL AND MUSEUM COMMISSION $34,156,000 <-- 5 (i) Drake Well State Museum 6 (A) Boomtown and other exhibit development 7 and construction 2,105,000 8 (ii) Niagara Maritime Museum 9 (A) Construction of fixed exhibits 750,000 <-- 10 (Base Project Allocation - $625,000) 11 (Design and Contingencies - $125,000) 12 (A) CONSTRUCTION OF FIXED EXHIBITS 1,750,000 <-- 13 (iii) Pithole State Museum 14 (A) Development and construction of 15 exterior walkways, boardwalks and 16 signage 100,000 17 (IV) RESTORATION OF NO. 9 MINE AND MUSEUM - <-- 18 LANSFORD 19 (A) RESTORATION 1,850,000 20 (BASE PROJECT ALLOCATION - $1,550,000) 21 (DESIGN AND CONTINGENCIES - $300,000) 22 (B) RESTORATION OF SWITCH-BACK RAILROAD - 23 SUMMIT HILL 16,856,000 24 (BASE PROJECT ALLOCATION - $14,388,000) 25 (DESIGN AND CONTINGENCIES - $2,468,000) 26 (V) SOMERSET HISTORICAL CENTER 27 (A) ADDITIONAL FUNDS FOR DGS 990-2 FOR 28 CONSTRUCTION OF AN ADDITION TO THE 29 CENTER AND IMPROVEMENTS FOR PARKING AND 30 ENTRANCE AREA 145,000 19970S0188B1351 - 36 -
1 (BASE PROJECT ALLOCATION - $145,000) 2 (B) ADDITIONAL FUNDS FOR DGS 990-2 FOR 3 CONSTRUCTION OF FIXED EXHIBITS 150,000 4 (BASE PROJECT ALLOCATION - $150,000) 5 (VI) FORT NECESSITY 6 (A) CONSTRUCTION OF THE NATIONAL ROAD 7 HERITAGE PARK EDUCATIONAL 8 INTERPRETATIVE CENTER AT FORT 9 NECESSITY 3,000,000 10 (VII) INSTALLATION OF FIRE PROTECTION SYSTEMS 11 AT EACH OF THE LISTED MUSEUMS OR PARKS: 12 (A) ANTHRACITE HERITAGE MUSEUM 180,000 13 (BASE PROJECT ALLOCATION - $150,000) 14 (DESIGN AND CONTINGENCIES - $30,000) 15 (B) BRANDYWINE BATTLEFIELD HISTORIC PARK 300,000 16 (BASE PROJECT ALLOCATION - $250,000) 17 (DESIGN AND CONTINGENCIES - $50,000) 18 (C) CONRAD WEISER HISTORIC PARK 180,000 19 (BASE PROJECT ALLOCATION - $150,000) 20 (DESIGN AND CONTINGENCIES - $30,000) 21 (D) CORNWALL IRON FURNACE 180,000 22 (BASE PROJECT ALLOCATION - $150,000) 23 (DESIGN AND CONTINGENCIES - $30,000) 24 (E) DANIEL BOONE HOMESTEAD 300,000 25 (BASE PROJECT ALLOCATION - $250,000) 26 (DESIGN AND CONTINGENCIES - $50,000) 27 (F) DRAKE WELL MUSEUM 300,000 28 (BASE PROJECT ALLOCATION - $250,000) 29 (DESIGN AND CONTINGENCIES - $50,000) 30 (G) ECKLEY MINER'S VILLAGE 300,000 19970S0188B1351 - 37 -
1 (BASE PROJECT ALLOCATION - $250,000) 2 (DESIGN AND CONTINGENCIES - $50,000) 3 (H) EPHRATA CLOISTER 600,000 4 (BASE PROJECT ALLOCATION - $500,000) 5 (DESIGN AND CONTINGENCIES - $100,000) 6 (I) FORT PITT MUSEUM 120,000 7 (BASE PROJECT ALLOCATION - $100,000) 8 (DESIGN AND CONTINGENCIES - $20,000) 9 (J) GRAEME PARK 120,000 10 (BASE PROJECT ALLOCATION - $100,000) 11 (DESIGN AND CONTINGENCIES - $20,000) 12 (K) HOPE LODGE/MATHER MILL 180,000 13 (BASE PROJECT ALLOCATION - $150,000) 14 (DESIGN AND CONTINGENCIES - $30,000) 15 (L) JOSEPH PRIESTLEY HOUSE 120,000 16 (BASE PROJECT ALLOCATION - $100,000) 17 (DESIGN AND CONTINGENCIES - $20,000) 18 (M) LANDIS VALLEY MUSEUM 600,000 19 (BASE PROJECT ALLOCATION - $500,000) 20 (DESIGN AND CONTINGENCIES - $100,000) 21 (N) OLD ECONOMY VILLAGE 600,000 22 (BASE PROJECT ALLOCATION - $500,000) 23 (DESIGN AND CONTINGENCIES - $100,000) 24 (O) PENNSBURY MANOR 360,000 25 (BASE PROJECT ALLOCATION - $300,000) 26 (DESIGN AND CONTINGENCIES - $60,000) 27 (P) PENNSYLVANIA LUMBER MUSEUM 300,000 28 (BASE PROJECT ALLOCATION - $250,000) 29 (DESIGN AND CONTINGENCIES - $50,000) 30 (Q) PENNSYLVANIA MILITARY MUSEUM 180,000 19970S0188B1351 - 38 -
1 (BASE PROJECT ALLOCATION - $150,000) 2 (DESIGN AND CONTINGENCIES - $30,000) 3 (R) RAILROAD MUSEUM OF PENNSYLVANIA 180,000 4 (BASE PROJECT ALLOCATION - $150,000) 5 (DESIGN AND CONTINGENCIES - $30,000) 6 (S) WASHINGTON CROSSING HISTORIC PARK 600,000 7 (BASE PROJECT ALLOCATION - $500,000) 8 (DESIGN AND CONTINGENCIES - $100,000) 9 (VIII) LANDIS VALLEY MUSEUM 10 (A) STORAGE BUILDING AND HANDS-ON-HOUSE 11 MUSEUM 500,000 12 (IX) FORT PITT MUSEUM, POINT STATE PARK, <-- 13 ALLEGHENY COUNTY. ADDITIONAL FUNDS FOR DGS 14 989-2. REPLACE AND RECONSTRUCT ROOFING 15 SYSTEM AND RESTORE INTERIOR FINISHES TO 16 PROVIDE FOR: REMOVAL OF EXISTING FAILED 17 ROOFING WITH SOD COVER AND CRIBBING, NEW 18 ROOF STRUCTURE THAT WILL PROHIBIT TRESPASS 19 FROM FORT PITT BRIDGE APPROACH, WITH 20 APPURTENANT STRUCTURE AND FINISHES, 21 RESTORE, REPAIR OR PROVIDE NEW EXTERIOR AND 22 INTERIOR FINISHES 2,000,000 23 (BASE PROJECT ALLOCATION - $1,600,000) 24 (DESIGN AND CONTINGENCIES - $400,000) 25 (9) Department of Labor and Industry $7,000,000 26 (i) Hiram G. Andrews Center 27 (A) Upgrade and repair of facility 7,000,000 28 (10) Department of Military and Veterans Affairs $26,628,000 <-- 29 (10) DEPARTMENT OF MILITARY AND VETERANS AFFAIRS $41,963,000 <-- 30 (i) Cambria County Armory at Johnstown 19970S0188B1351 - 39 -
1 (A) Renovation and addition 1,380,000 2 (Base Project Allocation - $1,150,000) 3 (Design and Contingencies - $230,000) 4 (II) ERIE, SOLDIERS AND SAILORS HOME <-- 5 (A) NEW CONSTRUCTION OF TWO SUN ROOMS AND 6 CONVERSION OF EXISTING PORCH TO A SUN 7 ROOM IN THE PATIENT CARE BUILDING 470,000 8 (BASE PROJECT ALLOCATION - $392,000) 9 (DESIGN AND CONTINGENCIES - $78,000) 10 (ii) (III) Franklin County Veterans Care <-- 11 Facility 12 (A) South Mountain Restoration Center 12,000,000 13 (Base Project Allocation - $10,400,000) 14 (Design and Contingencies - $1,600,000) 15 (iii) (IV) Hollidaysburg Veterans Home <-- 16 (A) Improvements to facility roadways and 17 parking lots 1,000,000 18 (iv) (V) Southeastern Veterans Home <-- 19 (A) Expansion of parking facility 285,000 20 (v) (VI) Scotland School <-- 21 (A) Additional funds for project DGS 415- 22 29, reconstruction of the main dining 23 hall 500,000 24 (vi) (VII) Western maneuver training area <-- 25 (A) To acquire three parcels of land, 26 5,300 acres more or less, to establish 27 a tracked vehicle maneuver training 28 area in Western Pennsylvania for the 29 Pennsylvania National Guard 8,000,000 30 (VIII) EASTON ARMORY IN NORTHAMPTON COUNTY <-- 19970S0188B1351 - 40 -
1 (A) CONSTRUCTION OF A NEW FACILITY IN 2 NORTHAMPTON COUNTY AND SUPPORTING 3 FACILITIES TO INCLUDE MILITARY AND OFF- 4 STREET PARKING, ACCESS ROADS AND 5 SIDEWALKS 1,370,000 6 (BASE PROJECT ALLOCATION - $1,000,000) 7 (LAND ALLOCATION - $70,000) 8 (DESIGN AND CONTINGENCIES - $300,000) 9 (vii) (IX) Armory at Latrobe <-- 10 (A) Construction of a new armory at 11 Latrobe, Westmoreland County to replace 12 existing armories at Blairsville and 13 Latrobe 1,800,000 14 (Base Project Allocation - $1,300,000) 15 (Land Allocation - $300,000) 16 (Design and Contingencies - $200,000) 17 (viii) (X) Armory at Tioga County <-- 18 (A) Construction of a new armory in Tioga 19 County to replace existing armories at 20 Mansfield and Wellsboro 1,363,000 21 (Base Project Allocation - $1,163,000) 22 (Design and Contingencies - $200,000) 23 (ix) (XI) Maintenance Shop at Johnstown <-- 24 (A) Land acquisition for the construction 25 of an operations maintenance shop at 26 Johnstown, Cambria County 300,000 27 (XII) CAMBRIA COUNTY WAR MEMORIAL EXPANSION 10,000,000 <-- 28 (XIII) PENNSYLVANIA VETERANS MEMORIAL 29 (A) CONSTRUCTION OF THE PENNSYLVANIA 30 VETERANS MEMORIAL AT FORT INDIANTOWN 19970S0188B1351 - 41 -
1 GAP IN LEBANON COUNTY. THIS PROJECT 2 WILL BE CONSTRUCTED ENTIRELY WITH 3 PRIVATE DONATIONS, THEREFORE REQUIRING 4 NO STATE FUNDS 3,495,000 5 (BASE PROJECT ALLOCATION - $3,000,000) 6 (DESIGN AND CONTINGENCIES - $495,000) 7 (11) Department of Public Welfare $13,744,000 <-- 8 (11) DEPARTMENT OF PUBLIC WELFARE $14,844,000 <-- 9 (11) DEPARTMENT OF PUBLIC WELFARE $24,844,000 <-- 10 (i) Norristown State Hospital 11 (A) Reconstruction or replacement of 12 boilers to meet emissions requirements 13 and upgrade the steam distribution 14 system 3,924,000 15 (Base Project Allocation - $3,270,000) 16 (Design and Contingencies - $654,000) 17 (ii) Clarks Summit State Hospital 18 (A) Additional funds for project DGS 502- 19 25, renovation of power plant boilers 20 and distribution system 4,480,000 21 (Base Project Allocation - $3,480,000) 22 (Design and Contingencies - $1,000,000) 23 (iii) Danville State Hospital 24 (A) Installation of upgraded high voltage 25 distribution cables throughout system 540,000 26 (Base Project Allocation - $450,000) 27 (Design and Contingencies - $90,000) 28 (B) INSTALL PERIMETER FENCE AROUND THE <-- 29 REED BUILDING FOR THE SECURE JUVENILE 30 FACILITY 200,000 19970S0188B1351 - 42 -
1 (BASE PROJECT ALLOCATION - $167,000) 2 (DESIGN AND CONTINGENCIES - $33,000) 3 (iv) South Mountain Restoration Center 4 (A) Installation of integrated and updated 5 fire alarm system for entire facility 2,160,000 6 (Base Project Allocation - $1,800,000) 7 (Design and Contingencies - $360,000) 8 (v) Ebensburg Center 9 (A) Additional funds for project DGS 583- 10 11, replacement of steam lines 720,000 11 (Base Project Allocation - $600,000) 12 (Design and Contingencies - $120,000) 13 (vi) Polk Center 14 (A) Installation of integrated and updated 15 fire alarm system for entire facility 1,440,000 16 (Base Project Allocation - $1,200,000) 17 (Design and Contingencies - $240,000) 18 (vii) White Haven Center 19 (A) Upgrade of electrical distribution 20 system 480,000 21 (Base Project Allocation - $400,000) 22 (Design and Contingencies - $80,000) 23 (VIII) LOYSVILLE YOUTH DEVELOPMENT CENTER <-- 24 (A) INSTALL UPGRADED LOCKS FOR SELECTED 25 SECURE AREAS 100,000 26 (BASE PROJECT ALLOCATION - $83,000) 27 (DESIGN AND CONTINGENCIES - $17,000) 28 (B) INSTALL A PERIMETER INTRUSION 29 DETECTION AND WARNING SYSTEM 180,000 30 (BASE PROJECT ALLOCATION - $150,000) 19970S0188B1351 - 43 -
1 (DESIGN AND CONTINGENCIES - $30,000) 2 (IX) NEW CASTLE YOUTH DEVELOPMENT CENTER 3 (A) INSTALL UPGRADED LOCKS FOR SELECTED 4 SECURE AREAS 135,000 5 (BASE PROJECT ALLOCATION - $113,000) 6 (DESIGN AND CONTINGENCIES - $22,000) 7 (X) BENSALEM YOUTH DEVELOPMENT CENTER 8 (A) INSTALL ELECTRONIC MONITORING SYSTEM 9 AND VISITOR CENTER 300,000 10 (BASE PROJECT ALLOCATION - $250,000) 11 (DESIGN AND CONTINGENCIES - $50,000) 12 (B) REPLACE UNDERGROUND HIGH VOLTAGE 13 PRIMARY ELECTRICAL CABLING 185,000 14 (BASE PROJECT ALLOCATION - $154,000) 15 (DESIGN AND CONTINGENCIES - $31,000) 16 (XI) EASTERN PENNSYLVANIA PSYCHIATRIC <-- 17 INSTITUTE 18 (A) UPGRADE OF PATIENT UNITS TO COME INTO 19 CODE COMPLIANCE AND GENERAL 20 IMPROVEMENTS 5,500,000 21 (B) RENOVATIONS AND IMPROVEMENTS TO 22 HEATING, VENTILATION AND AIR 23 CONDITIONING SYSTEM 2,500,000 24 (C) BUILDING ENVELOPE REPAIRS AND WINDOW 25 REPLACEMENT 2,000,000 26 (12) Pennsylvania State Police $4,680,000 27 (i) Trevose Station, Bucks County 28 (A) Demolition of existing structure and 29 construction of new building on site 2,000,000 30 (ii) Hollidaysburg Troop Headquarters 19970S0188B1351 - 44 -
1 (A) Additional funds for DGS 201-3, 2 renovation and expansion of 3 headquarters 2,680,000 4 (Base Project Allocation - $2,233,000) 5 (Design and Contingencies - $447,000) 6 (13) State System of Higher Education $565,270,000 <-- 7 (13) STATE SYSTEM OF HIGHER EDUCATION $562,538,000 <-- 8 (13) STATE SYSTEM OF HIGHER EDUCATION $572,538,000 <-- 9 (i) Bloomsburg State University 10 (A) Addition to Hartline Science 6,348,000 <-- 11 (B) Renovation of Navy Hall 4,288,000 12 (A) ADDITION TO HARTLINE SCIENCE 6,806,000 <-- 13 (B) RENOVATION OF NAVY HALL 4,710,000 14 (C) Renovation of Andrus Building 7,280,000 15 (ii) California State University 16 (A) Demolition of Reed Hall 330,000 17 (B) Renovation of Old Main and South Hall 8,827,000 18 (C) Addition to and renovation of Steel 19 Auditorium 5,718,000 20 (D) Renovation of Vulcan Hall 1,668,000 21 (E) Renovation of Noss Hall 3,366,000 22 (F) Installation of water back flow 23 preventers, campuswide 497,000 24 (G) Pedestrian and vehicular enhancement, 25 Phase I 4,592,000 26 (H) CONSTRUCTION OF A NEW DORMITORY 10,000,000 <-- 27 (iii) Cheyney University of Pennsylvania 28 (A) Addition to and renovation of athletic 29 facility 3,022,000 30 (B) Infrastructure renovations, Phase II 2,916,000 19970S0188B1351 - 45 -
1 (C) Renovation of Bailey Hall 4,369,000 2 (iv) Clarion State University 3 (A) Renovate/upgrade communication and 4 electrical system 4,944,000 5 (B) Replace steam lines - Phase III 5,476,000 6 (C) Addition to and renovation of Carlson 7 Library 17,060,000 8 (D) Renovation of Pierce Science Center 19,762,000 9 (v) East Stroudsburg State University 10 (A) Renovation of Rosenkrans Hall 3,875,000 11 (B) Addition to and renovation of 12 auditorium 4,900,000 13 (C) Renovation of LeRue Arts 861,000 14 (D) Upgrade infrastructure and storm water 15 management system 4,920,000 16 (E) Addition to and renovation of stadium 17 complex 3,226,000 18 (F) Renovation of Fine and Performing Arts 19 Building 1,080,000 20 (G) Renovation of and addition to 21 storeroom and garage 2,378,000 22 (vi) Edinboro State University 23 (A) Renovation of Butterfield Hall 4,936,000 24 (B) Rehabilitation of campus 25 infrastructure 5,820,000 26 (C) Renovation of Memorial Auditorium 2,498,000 27 (D) Renovation of Heather Hall 2,267,000 28 (E) Renovation of Baron-Forness Library 5,772,000 29 (vii) Indiana State University 30 (A) Renovation of Stabley Library 4,632,000 19970S0188B1351 - 46 -
1 (B) Construction of a replacement facility 2 for Wyandt Hall, Armstrong Campus 5,250,000 3 (C) Construction of a replacement facility 4 for Old Main, Punxsutawney Campus 4,632,000 5 (D) Addition to and renovation of Cogswell 6 Hall 8,888,000 7 (E) Renovation of Keith Hall 7,057,000 8 (F) Renovation of John Sutton Hall - Phase 9 I 7,382,000 10 (G) Renovation of Leonard Hall 5,252,000 11 (viii) Kutztown State University 12 (A) Renovation of Graduate Center 3,598,000 13 (B) Addition to and renovation of science 14 buildings 18,662,000 15 (C) Construction of Kutztown University 16 access road 2,760,000 17 (D) Renovation of Shaeffer Auditorium 5,206,000 18 (E) Addition to or renovation of 19 maintenance building 4,198,000 20 (F) Renovation and upgrade of boiler 21 plant 2,857,000 22 (G) Renovation of Reisley Hall 2,635,000 23 (ix) Lock Haven State University 24 (A) Renovation of New Ulmer Hall 6,720,000 25 (B) Renovation of Zimmerli Gym 7,306,000 26 (C) Addition to and renovation of Jack 27 Stadium - Phase III 2,798,000 28 (D) Renovation of Lusk Run Conduit 1,560,000 29 (E) Construction of building to serve as 30 branch campus in Clearfield County 5,000,000 19970S0188B1351 - 47 -
1 (x) Mansfield State University 2 (A) Addition to and renovation of Grant 3 Science 9,959,000 4 (B) Addition to and renovation of home 5 economics center 6,672,000 6 (C) Renovation of South Hall 4,178,000 7 (xi) Millersville State University 8 (A) Addition to and renovation of McComsey 9 Hall 7,657,000 10 (B) Renovation of Gerhart Hall 236,000 11 (C) Addition to and renovation of Stayer 12 Hall 6,835,000 13 (D) Renovation of Roddy Science Center 5,870,000 14 (E) Renovation of Lyle Hall 2,681,000 15 (F) Renovation of Osburn Hall 4,198,000 16 (G) Renovation of Ganser Building 5,914,000 17 (H) Renovation of Wickersham Hall 2,123,000 18 (I) Upgrade of electrical utility system 6,480,000 19 (xii) Shippensburg State University 20 (A) Renovation of Horton Hall 6,920,000 21 (B) Renovation of Gilbert and Stewart 22 Halls 3,478,000 23 (C) Construction of instructional arts 24 facility 19,853,000 25 (D) Addition to and renovation of Lehman 26 Library 19,778,000 27 (E) Reconstruction of roadways, sidewalks 28 and parking facilities 4,618,000 29 (F) Renovation of Franklin Science Center 14,514,000 30 (G) Renovation of Huber Arts Center and 19970S0188B1351 - 48 -
1 Counselor Education Building 2,798,000 2 (H) Addition to and renovation of Shippen 3 Hall 15,814,000 4 (I) Upgrade Steam Plant Boiler No. 4 563,000 5 (J) Renovation of Rowland and Shearer 6 Halls 5,167,000 7 (K) Renovation of Dauphin Humanities 4,124,000 8 (L) Construction of Central Services 9 Building 1,529,000 10 (xiii) Slippery Rock State University 11 (A) Renovation of Vincent Science <-- 12 Building 13,672,000 13 (B) Renovation of West Hall 2,260,000 14 (C) Renovation of Morrow Field House 12,564,000 15 (D) Reconstruction of roadways, sidewalks 16 and parking areas 2,244,000 17 (E) Construction of health professionals 18 building 12,324,000 19 (A) RENOVATION OF VINCENT SCIENCE <-- 20 BUILDING 14,442,000 21 (B) RENOVATION OF WEST HALL 2,297,000 22 (C) RENOVATION OF MORROW FIELD HOUSE 14,643,000 23 (D) RECONSTRUCTION OF ROADWAYS, SIDEWALKS 24 AND PARKING AREAS 1,530,000 25 (E) CONSTRUCTION OF PHYSICAL THERAPY 26 BUILDING 6,540,000 27 (F) Renovation of steam distribution 28 system - Phase II 7,680,000 29 (xiv) West Chester State University 30 (A) Renovation of Francis Harvey Green 19970S0188B1351 - 49 -
1 Building 4,154,000 2 (B) Construction of classroom facility 12,959,000 3 (C) Renovation of Schmucker Science - 4 Phase III 15,842,000 5 (D) Renovation of Lawrence Hall 3,051,000 6 (E) Construction of 7 computing/instructional technology 8 center 10,931,000 9 (F) Construction of all-purpose outdoor 10 physical education and athletic fields 3,314,000 11 (G) Infrastructure Upgrade/code updates - 12 Phase I 11,158,000 13 (H) Construction of Recital Hall 3,317,000 14 (I) Addition to and renovation of Eringer 15 Gym and Special Education Building 3,883,000 16 (xv) Systemwide project 17 (A) Alteration of facilities for ADA 18 compliance 34,569,000 19 (14) Department of Transportation $70,832,000 <-- 20 (14) DEPARTMENT OF TRANSPORTATION $175,532,000 <-- 21 (14) DEPARTMENT OF TRANSPORTATION $175,782,000 <-- 22 (i) Road Signage 23 (A) Purchase and erection of highway signs 24 in Fayette, Westmoreland and Somerset 25 Counties to promote access to Laurel 26 Highlands 400,000 27 (B) PURCHASE AND ERECTION OF HIGHWAY SIGNS <-- 28 IN THE SURROUNDING AND ADJACENT 29 COUNTIES TO PROMOTE THE ALLEGHENY 30 NATIONAL FOREST AND KINZUA RESERVOIR 350,000 19970S0188B1351 - 50 -
1 (ii) Erie County Welcome Center 2 (A) Additional funds to construct a new 3 welcome center 3,423,000 4 (Base Project Allocation - $2,759,000) 5 (Land Allocation - $120,000) 6 (Design and Contingencies - $544,000) 7 (iii) Harrisburg International Airport 8 (A) Replacement of the concrete surface of 9 runway 13-31 11,268,000 10 (Base Project Allocation - $11,268,000) 11 (B) Construction of a centralized de-icing 12 facility and the modification of the 13 hold pad at runway 13 for secondary de- 14 icing 8,936,000 15 (Base Project Allocation - $8,936,000) 16 (iv) Allegheny County 17 (A) High performance precision 18 manufacturing technology development by 19 the Institute for Precision 20 Technologies for use in bridge 21 structures, hermetically sealed box 22 beams and other metal fabricated 23 infrastructure components for 24 transportation systems 1,000,000 25 (B) High performance precision 26 manufacturing technology development by 27 the Institute for Precision 28 Technologies for use in bridge 29 structures, hermetically sealed box 30 beams and other metal fabricated 19970S0188B1351 - 51 -
1 infrastructure components for 2 transportation systems 25,000,000 3 (Base Project Allocation - $24,000,000) 4 (Design and Contingencies - $1,000,000) 5 (v) Blair County 6 (A) Construction of new maintenance 7 building at District 9-0 headquarters 700,000 8 (Base Project Allocation - $645,000) 9 (Design and Contingencies - $55,000) 10 (VI) LACKAWANNA COUNTY <-- 11 (A) BOROUGH OF TAYLOR, ROAD CONSTRUCTION, 12 INCLUDING STORM SEWERS AND CURBING ON 13 OAK STREET FROM KEYSER AVENUE TO MAIN 14 STREET 2,400,000 15 (BASE PROJECT ALLOCATION - $2,000,000 16 (DESIGN AND CONTINGENCIES - $400,000 17 (B) BOROUGH OF TAYLOR, ROAD 18 RECONSTRUCTION, INCLUDING STORM SEWERS 19 AND CURBING ON KEYSER AVENUE, FROM THE 20 TAYLOR/SCRANTON LINE TO THE TAYLOR/OLD 21 FORGE LINE 3,600,000 22 (BASE PROJECT ALLOCATION - $3,000,000) 23 (DESIGN AND CONTINGENCIES - $600,000) 24 (C) BOROUGH OF TAYLOR, ROAD 25 RECONSTRUCTION, INCLUDING STORM SEWERS 26 AND CURBING ON UNION STREET FROM KEYSER 27 AVENUE TO NORTH MAIN STREET 3,600,000 28 (BASE PROJECT ALLOCATION - $3,000,000) 29 (DESIGN AND CONTINGENCIES - $600,000) 30 (D) BOROUGH OF TAYLOR, ROAD 19970S0188B1351 - 52 -
1 RECONSTRUCTION, INCLUDING STORM SEWERS 2 AND CURBING ON MAIN STREET FROM THE 3 TAYLOR/SCRANTON LINE TO THE TAYLOR/OLD 4 FORGE LINE 3,600,000 5 (BASE PROJECT ALLOCATION - $3,000,000) 6 (DESIGN AND CONTINGENCIES - $600,000) 7 (E) BOROUGH OF DUNMORE, ROAD 8 RECONSTRUCTION, INCLUDING STORM SEWERS 9 AND CURBING ON BLAKELY STREET FROM THE 10 DUNMORE/THROOP LINE TO DUNMORE/SCRANTON 11 LINE 3,600,000 12 (BASE PROJECT ALLOCATION - $3,000,000) 13 (DESIGN AND CONTINGENCIES - $600,000) 14 (F) BOROUGH OF DUNMORE, ROAD 15 RECONSTRUCTION, INCLUDING STORM SEWERS 16 AND CURBING ON GREEN RIDGE STREET FROM 17 DUNMORE/SCRANTON LINE TO BLAKELY 18 STREET, DUNMORE 4,800,000 19 (BASE PROJECT ALLOCATION - $4,000,000) 20 (DESIGN AND CONTINGENCIES - $800,000) 21 (G) BOROUGH OF DUNMORE, ROAD 22 RECONSTRUCTION, INCLUDING STORM SEWERS 23 AND CURBING ON DRINKER STREET FROM 24 BLAKELY STREET TO I-81 3,600,000 25 (BASE PROJECT ALLOCATION - $3,000,000) 26 (DESIGN AND CONTINGENCIES - $600,000) 27 (H) BOROUGH OF THROOP, ROAD 28 RECONSTRUCTION, INCLUDING STORM SEWERS 29 AND CURBING ON CYPRESS STREET 30 (NORTHBOUND AND SOUTHBOUND LANES) FROM 19970S0188B1351 - 53 -
1 THROOP/DUNMORE LINE TO THROOP/OLYPHANT 2 LINE 6,000,000 3 (BASE PROJECT ALLOCATION - $5,000,000) 4 (DESIGN AND CONTINGENCIES - $1,000,000) 5 (I) CITY OF SCRANTON, ROAD RECONSTRUCTION, 6 INCLUDING STORM SEWERS AND CURBING ON 7 GREEN RIDGE STREET FROM NORTH MAIN 8 AVENUE TO SCRANTON/DUNMORE LINE 4,800,000 9 (BASE PROJECT ALLOCATION - $4,000,000) 10 (DESIGN AND CONTINGENCIES - $800,000) 11 (J) CITY OF SCRANTON, ROAD RECONSTRUCTION, 12 INCLUDING STORM SEWERS AND CURBING ON 13 PROVIDENCE ROAD FROM OLIVE STREET TO 14 NORTH MAIN AVENUE 3,600,000 15 (BASE PROJECT ALLOCATION - $3,000,000) 16 (DESIGN AND CONTINGENCIES - $600,000) 17 (K) CITY OF SCRANTON, ROAD RECONSTRUCTION, 18 INCLUDING STORM SEWERS AND CURBING ON 19 MAIN AVENUE FROM SCRANTON/TAYLOR LINE 20 TO SCRANTON/DICKSON CITY LINE 4,800,000 21 (BASE PROJECT ALLOCATION - $4,000,000) 22 (DESIGN AND CONTINGENCIES - $800,000) 23 (L) CITY OF SCRANTON, ROAD RECONSTRUCTION, 24 INCLUDING STORM SEWERS AND CURBING ON 25 KEYSER AVENUE FROM SCRANTON/TAYLOR LINE 26 TO WEST MARKET STREET 6,000,000 27 (BASE PROJECT ALLOCATION - $5,000,000) 28 (DESIGN AND CONTINGENCIES - $1,000,000) 29 (M) CITY OF SCRANTON, ROAD RECONSTRUCTION, 30 INCLUDING STORM SEWERS AND CURBING ON 19970S0188B1351 - 54 -
1 JACKSON STREET FROM KEYSER AVENUE TO 2 NEWTON ROAD 2,400,000 3 (BASE PROJECT ALLOCATION - $2,000,000) 4 (DESIGN AND CONTINGENCIES - $400,000) 5 (N) CITY OF SCRANTON, ROAD RECONSTRUCTION, 6 INCLUDING STORM SEWERS AND CURBING ON 7 NEWTON ROAD FROM JACKSON STREET TO 8 SCRANTON/RANSOM TOWNSHIP LINE 4,800,000 9 (BASE PROJECT ALLOCATION - $4,000,000) 10 (DESIGN AND CONTINGENCIES - $800,000) 11 (O) CITY OF SCRANTON, ROAD RECONSTRUCTION, 12 INCLUDING STORM SEWERS AND CURBING ON 13 LUZERNE STREET FROM NORTH MAIN AVENUE 14 TO KEYSER AVENUE 4,800,000 15 (BASE PROJECT ALLOCATION - $4,000,000) 16 (DESIGN AND CONTINGENCIES - $800,000) 17 (P) BOROUGH OF DUNMORE, FLOOD CONTROL AND 18 STORM WATER PROJECT, INCLUDING, BUT NOT 19 LIMITED TO, STORM SEWERS AND ROAD 20 RECONSTRUCTION AND PUMPING STATIONS IN 21 THE AREA OF CLAY AVENUE, QUINCY AVENUE, 22 MADISON AVENUE, JEFFERSON AVENUE AND 23 ADAMS AVENUE; MARION STREET, GREEN 24 RIDGE STREET AND ELECTRIC STREET 2,400,000 25 (BASE PROJECT ALLOCATION - $2,000,000) 26 (DESIGN AND CONTINGENCIES - $400,000) 27 (Q) BOROUGH OF TAYLOR, FLOOD CONTROL AND 28 STORM WATER PROJECT, INCLUDING, BUT NOT 29 LIMITED TO, STORM SEWERS AND ROAD 30 RECONSTRUCTION AND PUMPING STATIONS IN 19970S0188B1351 - 55 -
1 THE AREA OF GREEN VIEW WEST, INCLUDING 2 WALNUT STREET, OAK STREET, WILLIAMS 3 STREET, AND PRINCE STREET; MACKIE LANE, 4 VINE LANE, LAUREL LANE, CHESTER LANE 5 AND BICHLER LANE; RINALDI DRIVE, 6 BARBARA DRIVE; DONNY DRIVE AND ANTHONY 7 DRIVE 2,400,000 8 (BASE PROJECT ALLOCATION) - $2,000,000) 9 (DESIGN AND CONTINGENCIES - $400,000) 10 (vi) (VII) Montgomery County <-- 11 (A) Reconstruction and Rehabilitation of 12 Main Street from Beaver Street to 13 Prospect Avenue, Borough of North 14 Wales 1,715,000 15 (vii) (VIII) Montour County <-- 16 (A) Additional Funds for project DGS 251- 17 35, construction of transportation 18 maintenance shed 500,000 19 (B) CONSTRUCTION OF A SATELLITE <-- 20 MAINTENANCE BUILDING 1,200,000 21 (viii) (IX) Philadelphia, Delaware and Bucks <-- 22 Counties 23 (A) Dredging of the channel of the 24 Delaware River from 40 to 45 feet 15,000,000 25 (ix) (X) City of Erie <-- 26 (A) Improvements to city enterprise zone 27 transportation infrastructure 530,000 28 (x) Tioga County <-- 29 (A) Grand Canyon State Airport 30 (I) Construction of 20 hangars 500,000 19970S0188B1351 - 56 -
1 (Base Project Allocation - $400,000) 2 (Design and Contingencies - $100,000) 3 (xi) Adams County Welcome Center 4 (A) Additional funds for project DGS 657- 5 6, to construct a new welcome center 540,000 6 (Base Project Allocation - $450,000) 7 (Design and Contingencies - $90,000) 8 (xii) Susquehanna County Welcome Center 9 (A) Additional funds for project DGS 657- 10 13, to construct welcome center in 11 Great Bend Township 1,320,000 12 (Base Project Allocation - $1,100,000) 13 (Design and Contingencies - $220,000) 14 (XIII) HARRISBURG AREA <-- 15 (A) ADDITIONAL FUNDS FOR A NEW TESTING 16 LABORATORY 14,400,000 17 (BASE PROJECT ALLOCATION - $12,000,000) 18 (DESIGN AND CONTINGENCIES - $2,400,000) 19 (XIV) VENANGO COUNTY 20 (A) ACQUISITION OF A NEW DISTRICT OFFICE 21 BUILDING IN OIL CITY 1,000,000 22 (XV) FOREST COUNTY 23 (A) CONSTRUCTION OF NEW WELCOME CENTER 350,000 24 (XVI) MCKEAN COUNTY 25 (A) CONSTRUCTION OF NEW WELCOME CENTER 350,000 26 (XVII) WARREN COUNTY 27 (A) CONSTRUCTION OF NEW WELCOME CENTER 350,000 28 (XVIII) PORT OF PHILADELPHIA 29 (A) IMPROVEMENTS TO THE AMERIPORT 30 INTERMODAL CONNECTION FACILITY 5,000,000 19970S0188B1351 - 57 -
1 (B) ACQUISITION OF TWO CRANES CAPABLE OF <-- 2 HANDLING 56-FOOT OR LARGER SHIPPING 3 CONTAINERS 15,000,000 4 (B) ACQUISITION OF TWO CONTAINER CRANES 15,000,000 <-- 5 (XIX) LAWRENCE COUNTY 6 (A) INSTALLATION OF TRAFFIC SIGNALS ON SR 7 0168 IN TAYLOR TOWNSHIP 250,000 8 Section 4. Itemization of furniture and equipment projects. 9 Additional capital projects in the category of public 10 improvement projects consisting of the acquisition of movable 11 furniture and equipment to complete public improvement projects 12 and to be purchased by the Department of General Services, its 13 successors or assigns, and to be financed by the incurring of 14 debt, are hereby itemized, together with their respective 15 estimated financial costs, as follows: 16 Total 17 Project 18 Project Allocation 19 (1) Department of Agriculture $804,000 20 (i) Agriculture Laboratory 21 (A) Original furniture and equipment for 22 Agriculture laboratory DGS 700-32 804,000 23 (2) Department of Conservation and Natural 24 Resources $270,000 25 (i) Greenwood Furnace State Park 26 (A) Original furniture and equipment to 27 develop picnic and camping facilities, 28 DGS 129-1 90,000 29 (B) Original furniture and equipment for 30 administrative and support structures, 19970S0188B1351 - 58 -
1 DGS 129-2 90,000 2 (ii) Pymatuning State Park 3 (A) Original furniture and equipment to 4 rehabilitate Linesville boat livery DGS 5 103-4 70,000 6 (iii) Sinnemahoning State Park 7 (A) Original furniture and equipment to 8 reconstruct spillway and control tower 9 DGS 104-4 20,000 10 (3) Department of Education $18,037,000 11 (i) The Pennsylvania State University 12 (A) University Park Campus 13 (I) Renovation of animal diagnostic 14 laboratory and incinerator DGS 800- 15 244 240,000 16 (II) Electrical distribution system 17 DGS 800-217 390,000 18 (B) Behrend Campus 19 (I) Multipurpose facility for student 20 activities DGS 800-220 1,550,000 21 (C) Berks Campus 22 (I) Acquisition of land and 23 development of an agricultural 24 instruction center DGS 800-204 850,000 25 (D) Fayette Campus 26 (I) Multipurpose technological- 27 cultural "Southwest Institute" DGS 28 800-209 620,000 29 (II) Agricultural sciences 30 classroom/laboratory building DGS 19970S0188B1351 - 59 -
1 800-210 460,000 2 (III) Biomedical technology center DGS 3 800-238 660,000 4 (E) Harrisburg Campus 5 (I) Original furniture and equipment 6 for library DGS 800-233 1,650,000 7 (F) New Kensington Campus 8 (I) Addition to academic building DGS 9 800-212 260,000 10 (G) Wilkes-Barre Campus 11 (I) Technology center DGS 800-218 200,000 12 (ii) University of Pittsburgh 13 (A) Original furnishings and equipment for 14 Smith Hall DGS 1103-58 - Greensburg 15 Campus 45,000 16 (B) Additional funds for 17 Classroom/Administration Building DGS 18 1103-53 - Johnstown Campus 525,000 19 (C) Original furnishings and equipment for 20 Engineering and Science Center - 21 Johnstown Campus DGS 1103-59 76,000 22 (D) Additional funds for 23 Convocation/Events Center DGS 1103-48 - 24 Oakland Campus 1,458,000 25 (E) Additional funds for Multi-Purpose 26 Academic Complex DGS 1103-40 - Oakland 27 Campus 2,093,000 28 (F) Additional funds for Hillman Library 29 Addition DGS 1103-55 - Oakland Campus 316,000 30 (G) Original furnishings and equipment for 19970S0188B1351 - 60 -
1 Science Building DGS 1103-54 - 2 Titusville Campus 195,000 3 (H) Original furniture and equipment for 4 Sports Center expansion - Bradford 5 Campus 2,300,000 6 (I) Original furniture and equipment for 7 Communications, Arts and Technology 8 Building - Bradford Campus 2,200,000 9 (J) Additional original furniture and 10 equipment for Bellefield Annex 11 renovation - Oakland Campus 199,000 12 (iii) Northwest Pennsylvania Technical 13 Institute 14 (A) Original furniture and equipment for 15 Erie County public learning network 1,000,000 16 (iv) Thaddeus Stevens State School of 17 Technology 18 (A) Original furniture and equipment for 19 multi-purpose activities center and 20 trade-technical laboratory 750,000 21 (4) DEPARTMENT OF GENERAL SERVICES $449,000 <-- 22 (I) DAVID L. LAWRENCE CONVENTION CENTER 23 (A) MEETING ROOM FURNISHINGS, DECORATION 24 EQUIPMENT, COMPUTER EQUIPMENT, WINDOW 25 TREATMENTS AND SOUND SYSTEM 26 IMPROVEMENTS 449,000 27 (4) Historical and Museum Commission $610,000 <-- 28 (5) HISTORICAL AND MUSEUM COMMISSION $3,310,000 <-- 29 (5) HISTORICAL AND MUSEUM COMMISSION $1,310,000 <-- 30 (i) Railroad Museum of Pennsylvania 19970S0188B1351 - 61 -
1 (A) Original furniture and equipment for 2 locomotive shed DGS 980-3 220,000 3 (ii) Somerset Historical Center 4 (A) Original furniture and equipment for 5 expansion of the visitor center DGS 6 990-2 150,000 7 (iii) State Records Center 8 (A) Original furniture and equipment for 9 addition to the State Records Center 10 DGS 948-38 240,000 11 (IV) FORT PITT MUSEUM, POINT STATE PARK, <-- 12 ALLEGHENY COUNTY. ADDITIONAL FUNDS FOR DGS 13 989-2. REPLACE AND RECONSTRUCT ROOFING 14 SYSTEM AND RESTORE INTERIOR FINISHES TO 15 PROVIDE FOR: REMOVAL OF EXISTING FAILED 16 ROOFING WITH SOD COVER AND CRIBBING, NEW 17 ROOF STRUCTURE THAT WILL PROHIBIT TRESPASS 18 FROM FORT PITT BRIDGE APPROACH, WITH 19 APPURTENANT STRUCTURE AND FINISHES, 20 RESTORE, REPAIR OR PROVIDE NEW EXTERIOR AND 21 INTERIOR FINISHES 2,000,000 22 (BASE PROJECT ALLOCATION - $1,600,000) 23 (DESIGN AND CONTINGENCIES - $400,000) 24 (V) (IV) PENNSBURG VISITORS CENTER <-- 25 (A) ORIGINAL FURNITURE AND EQUIPMENT 300,000 26 (VI) (V) LANDIS VALLEY MUSEUM <-- 27 (A) ORIGINAL FURNITURE AND EQUIPMENT FOR 28 THE LANDIS VALLEY STORAGE BUILDING AND 29 THE HANDS-ON-HOUSE MUSEUM 400,000 30 (5) (6) Department of Military and Veterans <-- 19970S0188B1351 - 62 -
1 Affairs $1,093,000 2 (i) Southwestern Veterans Home Allegheny 3 County 4 (A) Original furniture and equipment for 5 the Southwestern Veterans Home DGS 967- 6 50 1,093,000 7 (6) (7) Department of Public Welfare $926,000 <-- 8 (i) Youth Detention Facility at Cresson 9 (A) Original furniture and equipment for 10 maximum security youth detention 11 facility for western Pennsylvania DGS 12 587-9 463,000 13 (ii) Youth Detention Facility at South 14 Mountain 15 (A) Original furniture and equipment for 16 maximum security youth detention 17 facility for eastern Pennsylvania DGS 18 557-13 463,000 19 (7) (8) State System of Higher Education $30,937,000 <-- 20 (i) Bloomsburg State University 21 (A) Original furniture and equipment for 22 Centennial Gymnasium DGS 401-51 1,042,000 23 (B) Original furniture and equipment for 24 Navy Hall 429,000 25 (C) Original furniture and equipment for 26 Hartline Science Center 952,000 27 (ii) California State University 28 (A) Original furniture and equipment for 29 Dixon Hall DGS 402-51 684,000 30 (B) Original furniture and equipment for 19970S0188B1351 - 63 -
1 Adamson Stadium DGS 402-52 140,000 2 (C) Original furniture and equipment for 3 World Culture Building DGS 402-53 613,000 4 (D) Original furniture and equipment for 5 Noss Hall 337,000 6 (E) Original furniture and equipment for 7 Steele Auditorium 572,000 8 (iii) Clarion State University 9 (A) Original furniture and equipment for 10 Carlson Library 2,048,000 11 (iv) East Stroudsburg State University 12 (A) Original furniture and equipment for 13 Zimbar Gymnasium DGS 405-52 407,000 14 (B) Original furniture and equipment for 15 Rosenkrans Hall 386,000 16 (C) Original furniture and equipment for 17 Eiler-Martin Stadium 323,000 18 (v) Edinboro State University 19 (A) Original furniture and equipment for 20 Loveland Hall DGS 406-47 30,000 21 (B) Original furniture and equipment for 22 Cooper Science DGS 406-51 234,000 23 (C) Original furniture and equipment for 24 Heather Hall 227,000 25 (D) Original furniture and equipment for 26 Butterfield Hall 494,000 27 (E) Original furniture and equipment for 28 Memorial Auditorium 250,000 29 (vi) Indiana University 30 (A) Original furniture and equipment for 19970S0188B1351 - 64 -
1 Clark Hall DGS 407-64 333,000 2 (B) Original furniture and equipment for 3 Uhler Hall DGS 407-65 504,000 4 (C) Original furniture and equipment for 5 John Sutton Hall - Phase I 738,000 6 (D) Original furniture and equipment for 7 Stabley Library 463,000 8 (E) Original furniture and equipment for 9 Cogswell Hall 889,000 10 (F) Original furniture and equipment for 11 Keith Hall 706,000 12 (vii) Kutztown State University 13 (A) Original furniture and equipment for 14 Athletic Facility DGS 408-54 280,000 15 (B) Original furniture and equipment for 16 Science Buildings 1,866,000 17 (C) Original furniture and equipment for 18 Graduate Center 360,000 19 (viii) Lock Haven State University 20 (A) Original furniture and equipment for 21 conversion of Boiler Plant to 22 Classrooms DGS 409-55 335,000 23 (B) Original furniture and equipment for 24 Clearfield Campus DGS 409-56 500,000 25 (C) Original furniture and equipment for 26 Rogers Gym DGS 409-57 311,000 27 (D) Original furniture and equipment for 28 Court House Annex DGS 409-58 440,000 29 (ix) Mansfield State University 30 (A) Original furniture and equipment for 19970S0188B1351 - 65 -
1 renovation of Gymnasium to Facility for 2 Instruction DGS 401-51 499,000 3 (B) Original furniture and equipment for 4 Belknap/Retan, DGS 410-49 768,000 5 (x) Millersville State University 6 (A) Original furniture and equipment for 7 McComsey Hall 766,000 8 (B) Original furniture and equipment for 9 Osburn Hall 420,000 10 (C) Original furniture and equipment for 11 Stayer Hall 684,000 12 (D) Original furniture and equipment for 13 Lyle Hall 268,000 14 (E) Original furniture and equipment for 15 Roddy Science Center 704,000 16 (F) Original furniture and equipment for 17 Gerhart Hall 24,000 18 (xi) Shippensburg State University 19 (A) Original furniture and equipment for 20 Franklin Science Center 1,742,000 21 (B) Original furniture and equipment for 22 Shippen Hall 1,581,000 23 (C) Original furniture and equipment for 24 Rowland and Shearer Halls 517,000 25 (D) Original furniture and equipment for 26 Huber Arts and Counselor Education 27 Building 280,000 28 (xii) Slippery Rock State University 29 (A) Original furniture and equipment for 30 Vincent Science Building 1,641,000 19970S0188B1351 - 66 -
1 (B) Original furniture and equipment for 2 Health Professionals Building 1,479,000 3 (xiii) West Chester State University 4 (A) Original furniture and equipment for 5 Swope Hall DGS 414-62 672,000 6 (B) Original furniture and equipment for 7 Schmucker Science - Phase III 1,584,000 8 (C) Original furniture and equipment for 9 Francis Harvey Green Building 415,000 10 (9) DEPARTMENT OF TRANSPORTATION $564,000 <-- 11 (I) VENANGO COUNTY DISTRICT 1-0 OFFICE 12 BUILDING 13 (A) ORIGINAL FURNISHINGS AND EQUIPMENT FOR 14 NEW DISTRICT 1-0 OFFICE BUILDING IN OIL 15 CITY, VENANGO COUNTY 564,000 16 Section 5. Itemization of transportation assistance projects. 17 (a) Mass transit.--Additional capital projects in the 18 category of transportation assistance projects for mass transit 19 in which an interest is to be acquired or constructed by the 20 Department of Transportation, its successors or assigns, and to 21 be financed by the incurring of debt, are hereby itemized, 22 together with their estimated financial costs, as follows: 23 Total 24 Project 25 Project Allocation 26 (1) AREA TRANSPORTATION AUTHORITY OF NORTH <-- 27 CENTRAL PENNSYLVANIA 28 (I) PURCHASE OF HEAVY-DUTY REPLACEMENT 29 VEHICLES AND ACCESSIBLE REPLACEMENT VANS 480,000 30 (II) FOR THE COMPLETION OF THE CONSTRUCTION OF 19970S0188B1351 - 67 -
1 PASSENGER AND BUS STORAGE FACILITIES 376,000 2 (III) COMPLETION OF A REGIONAL GIS/ITS SYSTEM 974,000 3 (1) (2) Beaver County Transit Authority <-- 4 (i) Purchase of buses and related equipment 185,000 5 (ii) Deployment of Intelligent Transportation 6 System 300,000 7 (2) (3) Berks Area Reading Transportation <-- 8 Authority 9 (i) Phase II - Downtown Transportation Center 867,000 10 (2.1) (4) Cambria County Transit Authority <-- 11 (i) Rehabilitate fuel storage and dispensing 12 system 196,000 13 (3) (5) Capitol Area Transit <-- 14 (i) Construction of the West Shore Transfer 15 Center 133,000 16 (ii) Purchase of two 28-passenger trolley 17 buses 93,000 18 (iii) Infrastructure improvements, vehicle 19 acquisition and planning for a 20 demonstration project for the Harrisburg 21 Transportation Center to Carlisle rail 22 corridor 1,000,000 23 (IV) ACQUISITION OF RAILS ROUTES, FACILITIES <-- 24 AND/OR TRACKAGE RIGHTS FOR COMMUTER RAIL 25 OPERATIONS IN THE CAPITOL REGION 15,000,000 26 (4) (6) Centre Area Transportation Authority <-- 27 (i) Purchase of service vehicles and automatic 28 vehicle locator system 120,000 29 (ii) Purchase of office and maintenance 30 equipment including spare parts 45,000 19970S0188B1351 - 68 -
1 (iii) Purchase of small transit buses and 2 spare parts 50,000 3 (iv) Purchase of ten replacement buses 500,000 4 (5) (7) Chambersburg Transit Authority <-- 5 (i) Construction or purchase of 6 administrative, maintenance and storage 7 facility 84,000 8 (6) (8) City of Philadelphia <-- 9 (i) Locust Street Concourse Improvements - 10 Construction of Locust Street Concourse 11 project in the public concourse area under 12 Locust Street between 12th and 16th 13 Streets, adjacent to the PATCO Lindenwood 14 High Speed Line and the 12th and 13th 15 Streets and 15th and 16th Streets stations 1,000,000 16 (ii) Erie Avenue Subway Station Intermodal 17 Improvements 308,000 18 (iii) Renovations at the Erie Station on Broad 19 Street subway 317,000 20 (IV) RECONSTRUCTION OF CHESTNUT STREET TRANSIT <-- 21 WAY 4,237,000 22 (V) PARKING AND OTHER IMPROVEMENTS FOR READING 23 TERMINAL 300,000 24 (6.1) (9) Delaware River Port Authority <-- 25 (i) Purchase and installation of equipment for 26 Front Street Substation for traction power 92,000 27 (7) (10) Erie Metropolitan Transit Authority <-- 28 (i) Construction of a park and ride lot in 29 Northwest Erie 167,000 30 (ii) Purchase of replacement buses and related 19970S0188B1351 - 69 -
1 equipment 285,000 2 (iii) Purchase of four replacement buses, 3 spare parts and maintenance items 182,000 4 (iv) Purchase of six minibuses 49,000 5 (V) INTERMODAL COMPLEX (BUS TRANSFER STATION) 1,700,000 <-- 6 (7.1) (11) Indiana County Transit Authority <-- 7 (i) Purchase of replacement transit buses 120,000 8 (7.2) (12) Lackawanna County Transit System <-- 9 (i) Purchase of 13 buses and maintenance 488,000 10 (8) (13) Lehigh and Northampton Transportation <-- 11 Authority 12 (i) Replacement of 25 buses 1,084,000 13 (8.1) (14) Mid Mon Valley Transit Authority <-- 14 (i) Purchase of five suburban transit coaches 233,000 15 (9) (15) Port Authority of Allegheny County <-- 16 (i) Fiscal Year 1995-1996 Section 9 Program of <-- 17 Projects 4,500,000 18 (ii) Fiscal Year 1995-1996 fixed guideway 19 modernization projects 3,500,000 20 (iii) Environmental cleanup 2,000,000 21 (iv) Spine Line 43,500,000 22 (v) Airport Busway 18,600,000 23 (vi) Fiscal Year 1996-1997 Section 9 Program 24 of Projects 4,500,000 25 (vii) Fiscal Year 1996-1997 Vehicle Overhaul 5,000,000 26 (viii) Fiscal Year 1997-1998 Vehicle Overhaul 11,000,000 27 (ix) Fiscal Year 1996-1997 Fixed Guideway 28 Modernization 3,500,000 29 (x) Fiscal Year 1996-1997 Title I ISTEA 30 Flexible Funds - Busway Improvements 167,000 19970S0188B1351 - 70 -
1 (I) FISCAL YEAR 1995-1996 SECTION 9 PROGRAM OF <-- 2 PROJECTS 4,500,000 3 (II) FISCAL YEAR 1996-1997 SECTION 9 PROGRAM 4 OF PROJECTS 4,500,000 5 (III) FISCAL YEAR 1997-1998 SECTION 9 PROGRAM 6 OF PROJECTS 4,500,000 7 (IV) FISCAL YEAR 1998-1999 SECTION 9 PROGRAM 8 OF PROJECTS 4,500,000 9 (V) FISCAL YEAR 1996-1997 VEHICLE OVERHAUL 6,000,000 10 (VI) FISCAL YEAR 1997-1998 VEHICLE OVERHAUL 5,000,000 11 (VII) FISCAL YEAR 1998-1999 VEHICLE OVERHAUL 5,000,000 12 (VIII) FISCAL YEAR 1995-1996 FIXED GUIDEWAY 13 MODERNIZATION 3,500,000 14 (IX) FISCAL YEAR 1996-1997 FIXED GUIDEWAY 15 MODERNIZATION 3,500,000 16 (X) FISCAL YEAR 1997-1998 FIXED GUIDEWAY 17 MODERNIZATION 3,500,000 18 (XI) FISCAL YEAR 1998-1999 FIXED GUIDEWAY 19 MODERNIZATION 3,500,000 20 (XII) FISCAL YEAR 1997-1998 FEDERAL FLEX 1,323,000 21 (XIII) FISCAL YEAR 1998-1999 FEDERAL FLEX 1,323,000 22 (XIV) FISCAL YEAR 1997-1998 INFRASTRUCTURE 23 SAFETY RENEWAL PROGRAM (ISRP) 13,700,000 24 (XV) FISCAL YEAR 1998-1999 INFRASTRUCTURE 25 SAFETY RENEWAL PROGRAM (ISRP) 13,700,000 26 (XVI) FISCAL YEAR 1996-1997 TITLE I ISTEA 27 FLEXIBLE FUNDS 117,000 28 (XVII) ENVIRONMENTAL CLEANUP 2,000,000 29 (XVIII) STAGE II LIGHT RAIL TRANSIT 30 RECONSTRUCTION 11,333,000 19970S0188B1351 - 71 -
1 (XIX) BUS PROCUREMENT 10,000,000 2 (XX) NORTH SHORE/CENTRAL BUSINESS DISTRICT 3 TRANSPORTATION IMPROVEMENT PROJECT 12,500,000 4 (XXI) STAGE II LIGHT RAIL TRANSIT PROGRAM 13,499,000 5 (XXII) FISCAL YEAR 1995-1996 TITLE I ISTEA 6 FLEXIBLE FUNDS - PAT BUSWAY IMPROVEMENTS 1,667,000 7 (XXIII) FISCAL YEAR 1995-1996 TITLE I ISTEA 8 FLEXIBLE FUNDS STAGE II LIGHT RAIL TRANSIT 9 PROGRAM 3,333,000 10 (XXIV) EAST BUSWAY EXTENSION 43,500,000 11 (XXV) EAST BUSWAY EXTENSION LINER PARK 6,000,000 <-- 12 (10) (16) Southeastern Pennsylvania <-- 13 Transportation Authority 14 (i) Fiscal Year 1995-1996 Infrastructure, 15 Safety and Renewal Program 5,000,000 <-- 16 (ii) Environmental cleanup 5,000,000 17 SAFETY AND RENEWAL PROGRAM 25,000,000 <-- 18 (II) FISCAL YEAR 1995-1996 ENVIRONMENTAL 19 CLEANUP 5,000,000 20 (iii) Fiscal Year 1995-1996 Vehicle Overhaul 21 Program 40,000,000 22 (iv) Fiscal Year 1995 Section 9 Program 9,521,000 23 (v) Frankford Elevated Reconstruction Projects 24 - Fiscal Year 1995 Requirement 8,334,000 25 (vi) Fiscal Year 1995 Section 3 Fixed Guideway 26 Program 5,469,000 27 (vii) Fiscal Year 1995 Section 9 Approved 28 Federal Highway Flexed Projects 16,784,000 29 (viii) Section 3 Approved Highway Flexing 4,098,000 <-- 30 (VIII) FRANKFORD TRANSPORTATION CENTER <-- 19970S0188B1351 - 72 -
1 CONSTRUCTION - FISCAL YEARS 1994 THROUGH 2 1997 REQUIREMENT 4,098,000 3 (ix) Fiscal Year 1995 Section 3 Bus Purchase 1,250,000 4 (x) Chester Transportation Center 1,250,000 5 (xi) Cross County Metro - Major Investment 6 Study 251,000 7 (xii) Regional Rail Traction Power/Circuit 8 Breaker 146,000 9 (xiii) Fiscal Year 1996-1997 Vehicle Overhaul 10 Program 45,000,000 11 (xiv) Fiscal Year 1996-1997 Infrastructure 12 Safety and Renewal Program 25,000,000 13 (xv) Fiscal Year 1996-1997 Environmental 14 Cleanup 5,000,000 15 (xvi) Frankford Elevated Reconstruction 16 Program - Fiscal Year 1996 Section 3 8,334,000 17 (xvii) Fiscal Year 1996 Section 9 Program of 18 Projects 9,316,000 19 (xviii) Fiscal Year 1996 Section 3 Program 4,528,000 20 (xix) Fiscal Year 1996 Section 3 Bus 21 Acquisition 1,551,000 22 (xx) Fiscal Year 1996 Section 3 Alternative 23 Fuel Buses 311,000 24 (xxi) North Philadelphia Transportation 25 Center 621,000 26 (xxii) Federal Highway Flexible Funding 27 program, 1996 515,000 28 (xxiii) Development of rail traction power 29 distribution 521,000 <-- 30 DISTRIBUTION 604,000 <-- 19970S0188B1351 - 73 -
1 (xxiv) Completion of Frankford Elevated 2 reconstruction final segment including 3 renovating five stations, 1997 Section 3 8,333,000 4 (xxv) Acquisition of buses, automatic train <-- 5 controls, underground storage tanks, 1997 6 Section 9 8,833,000 7 (xxvi) Infrastructure for Market/Frankford 8 Line, Broad Street signal system and 9 station accessibility, 1997 Section 3 5,666,000 10 (xxvii) Purchase of 200 advanced design 11 accessible buses, 1997 Section 3 3,333,000 12 (XXV) ACQUISITION OF BUSES, PURCHASE OF <-- 13 ROLLING STOCK COMPONENTS AND EQUIPMENT, 14 PURCHASE OF TOOLS AND EQUIPMENT AND 15 UNDERGROUND STORAGE TANK 16 REMOVAL/MODIFICATIONS - FISCAL YEAR 1997 17 SECTION 9 8,833,000 18 (XXVI) IMPROVEMENT FOR MARKET/FRANKFORD LINE, 19 BROAD STREET SUBWAY SIGNAL SYSTEM AND 20 STATION ACCESSIBILITY, 1997 SECTION 3 5,526,000 21 (XXVII) PURCHASE OF ADVANCED DESIGN ACCESSIBLE 22 BUSES, 1997 SECTION 3 1,664,000 23 (xxviii) Purchase of alternative fuels buses 24 for routes in Bucks, Chester and Montgomery 25 Counties, 1997 Section 3 1,667,000 <-- 26 COUNTIES, 1997 SECTION 3 827,000 <-- 27 (xxix) Continued construction of 28 transportation center in North 29 Philadelphia 1,000,000 <-- 30 (xxx) Continued reconstruction of the 19970S0188B1351 - 74 -
1 Frankford Elevated Line, 1996 Section 3 2 Program, specifically station 3 accessibility, fleet renewal, reconstruct 4 Market elevated 4,528,000 5 PHILADELPHIA 207,000 <-- 6 (XXX) FISCAL YEAR 1996 NORTH PHILADELPHIA - 7 LIVABLE COMMUNITIES 11,000 8 (XXXI) FISCAL YEAR 1997-1998 VEHICLE OVERHAUL 15,200,000 9 (XXXII) FISCAL YEAR 1997-1998 INFRASTRUCTURE 10 SAFETY RENEWAL 20,000,000 11 (XXXIII) FISCAL YEAR 1998 FEDERAL FORMULA 12 GRANT PROGRAM 25,334,000 13 (XXXIV) FRANKFORD TRANSPORTATION CENTER - 14 CONSTRUCTION 5,000,000 15 (XXXV) PAOLI TRANSPORTATION CENTER - 16 ENGINEERING, LAND ACQUISITION AND 17 CONSTRUCTION 333,000 18 (XXXVI) SCHUYLKILL VALLEY METRO - MAJOR 19 INVESTMENT, ENVIRONMENTAL IMPACT STUDIES 20 AND PRELIMINARY ENGINEERING 333,000 21 (XXXVII) FISCAL YEAR 1998 FLEXIBLE HIGHWAY 22 ADMINISTRATION FUNDING - I-95 23 TRANSPORTATION MITIGATION PROGRAM, REGIONAL 24 TRANSIT STOP SIGNAGE (CMAQ), FRONTIER 25 ALTERNATIVE FUEL PROJECT (CMAQ), BUS 26 PURCHASE PROGRAM AND SMALL BUS ACQUISITION 27 PROGRAM 7,977,000 28 (XXXVIII) MIDVALE BUS GARAGE - CONSTRUCTION 1,814,000 29 (XXXIX) FRA SUBURBAN TO 30TH STREET STATION 30 BRIDGES AND CATENARY/OVERBROOK TRAIN 19970S0188B1351 - 75 -
1 STATION RENOVATION 1,430,000 2 (XL) FISCAL YEAR 1997 FHWA FLEXING 551,000 3 (XLI) FISCAL YEAR 1997-1998 FEDERAL FLEXIBLE <-- 4 FUND PROJECTS 3,646,000 5 (XLII) FISCAL YEAR 1998-1999 FEDERAL FLEXIBLE 6 FUND PROJECTS 3,646,000 7 (11) (17) Shenango Valley Shuttle Service <-- 8 (i) Construction of a new transit center and 9 park and ride facility 100,000 10 (ii) Purchase of two transit buses 67,000 11 (12) (18) Red Rose Transportation Authority <-- 12 (i) Construction of a rail station along 13 Amtrak Line in eastern Lancaster County 68,000 <-- 14 AMTRAK LINE IN EASTERN LANCASTER COUNTY 410,000 <-- 15 (II) PHASE II, EXTEND STRASBURG RAILROAD TRACK 16 FROM LEAMAN PLACE TO RAIL STATION SITE 3,615,000 17 (III) ADA COMPLIANCE PROJECT FOR LANCASTER 18 CITY TRAIN STATION 600,000 19 (IV) DOWNTOWN LANCASTER TRANSFER TERMINAL 5,300,000 20 (13) (19) Williamsport Bureau of Transportation <-- 21 (i) Construction of a central business 22 district transportation center 683,000 23 (13.1) (20) York Area Transportation Authority <-- 24 (i) Construction of a bus transfer center 455,000 25 (14) (21) Class 3, Class 4 and Community Public <-- 26 Transportation Systems 27 (i) Projects, including, but not limited to, 28 purchase of vehicles, vehicle overhaul, 29 purchase of facilities, facility 30 renovations, other capital equipment and 19970S0188B1351 - 76 -
1 associated capital items for Fiscal Year 2 1996-1997 7,500,000 3 (15) (22) Department of Transportation <-- 4 (i) Purchase of rail passenger equipment and <-- 5 rail infrastructure improvements 2,600,000 6 (ii) Rehabilitation of rail stations along 7 Keystone Corridor 1,500,000 8 (I) PRELIMINARY ENGINEERING, ACQUISITION, <-- 9 CONSTRUCTION, RECONSTRUCTION OR 10 REHABILITATION OF RAIL PASSENGER 11 FACILITIES, EQUIPMENT OR ROLLING STOCK 5,000,000 12 (b) Rural and intercity rail.--Additional capital projects 13 in the category of transportation assistance projects for rural 14 and intercity rail service projects to be constructed or with 15 respect to which an interest is to be acquired by the Department 16 of Transportation, its successors or assigns, and to be financed 17 by the incurring of debt, are hereby itemized, together with 18 their respective estimated financial costs, as follows: 19 Total 20 Project 21 Project Allocation 22 (1) Allegheny County 23 (i) Purchase of the Wheeling and Lake Erie <-- 24 Railway 12,000,000 25 (ii) Construction of railroad connection to 26 interchange Wheeling and Lake Erie traffic 27 to Pittsburgh Industrial Railroad to 28 reestablish CSXT interchange South of 29 Bridgeville between Milepost 57 and 30 Milepost 61 2,500,000 19970S0188B1351 - 77 -
1 (iii) (I) Wheeling and Lake Erie Railroad line <-- 2 rehabilitation 1,500,000 3 (iv) (II) Purchase of a portion of West End <-- 4 Branch of Wheeling Lake Erie Railway Right- 5 of-way to accommodate West End Circle 6 Project of PennDOT and construction of 7 railroad connection to interchange Wheeling 8 and Lake Erie traffic to Pittsburgh 9 Industrial Railroad to reestablish CSXT 10 interchange south of Bridgeville between 11 Milepost 57 and Milepost 61 12,500,000 12 (v) Purchase of West End Branch of Wheeling <-- 13 Lake Erie Railway from Steuben Street to 14 Wabash Tunnel to accommodate Banksville 15 Interchange at 1-279 and the development of 16 HOV corridor 6,500,000 17 (vi) (III) Purchase Wheeling and Lake Erie <-- 18 Railway main right-of-way from Rook Yard 19 (Milepost 56 to Longview Milepost 46) to 20 create two new transportation corridors to 21 downtown Pittsburgh 18,000,000 22 (vii) (IV) Wheeling & Lake Erie Railway <-- 23 Company 24 (A) Replacement of deteriorated crossties 25 on former P & WV rail line that runs 26 for 38.6 miles between Pierce and 27 Connellsville to allow for intermodal 28 traffic or expected volume of iron ore 29 trains 800,000 30 (Base Project Allocation - $720,000) 19970S0188B1351 - 78 -
1 (Design and Contingencies - $80,000) 2 (viii) (V) Development of intermodal <-- 3 transportation and distribution facility in 4 Leetsdale 1,250,000 5 (ix) (VI) Pittsburgh, Allegheny and McKees <-- 6 Rocks Railroad 7 (A) Maintenance of infrastructure along 8 trackage 300,000 9 (2) Allegheny and Washington Counties 10 (i) Pittsburgh Industrial Railroad 11 (A) Maintenance of infrastructure at 12 various points along trackage from 13 Youngwood to Fairchance 300,000 14 (3) Allegheny, Westmoreland, Washington and 15 Fayette 16 (i) Former Pittsburgh West Virginia Line 17 (A) Replacement of deteriorated crossties 18 on 38.6 miles of trackage 600,000 19 (4) Beaver County 20 (i) Ohio and Pennsylvania Railroad 21 (A) Rehabilitation of seven miles of rail 22 line 450,000 23 (II) PENN POWER <-- 24 (A) REHABILITATION OF SPECIFIC SECTIONS OF 25 BRANCH LINE FROM NOVA CHEMICAL TO 26 DUQUESNE NUCLEAR POWER IN SHIPPINGPORT 27 BOROUGH 1,474,000 28 (III) NATIONAL GYPSUM 29 (A) BUILD AN INDUSTRIAL RAIL SPUR WITH ALL 30 APPROPRIATE SIGNALS INTO NEW PLANT FROM 19970S0188B1351 - 79 -
1 BRANCH LINE 815,000 2 (IV) BEAVER COUNTY CORPORATION FOR ECONOMIC 3 DEVELOPMENT MIDA RAIL PROJECT 250,000 4 (5) Berks County 5 (i) Reading, Blue Mountain and Northern 6 Railroad 7 (A) Construction of connection from USRA 8 Line No. 197b to Reading & Northern 9 Railroad at Temple 800,000 10 (6) Blair County 11 (i) Morrison's Cove Railroad 12 (A) Replace three sections of existing 13 track with heavy rail for approximately 14 3.0 miles to handle existing traffic on 15 the Morrison's Cove Railroad and the 16 Martinsburg Branch; replace track 17 switches; upgrade three grade 18 crossings 396,000 19 (7) Bucks County 20 (i) Bristol Industrial Park 21 (A) Construction of industrial terminal 22 railway extension 125,000 23 (ii) USX Fairless Industrial Park 24 (A) Upgrade of interchange points 600,000 25 (8) Butler County 26 (i) Buffalo and Pittsburgh Railroad 27 (A) Construction of new rail side track 28 and four new turnouts 200,000 29 (B) Johnsonburg Bypass rail connection 30 between Buffalo and Pittsburgh Railroad 19970S0188B1351 - 80 -
1 and the Allegheny and Eastern Railroad 3,200,000 2 (C) Mainline from Punxsutawney to Falls 3 Creek 1,000,000 4 (ii) Genesee and Wyoming Railroad <-- 5 (A) Butler to Bruin 1,800,000 6 (II) CSX RAIL TAKEOVER <-- 7 (A) ACQUISITION OF THE RAILROAD BETWEEN 8 GLENSHAW AND EVANS CITY 5,000,000 9 (9) CAMBRIA COUNTY <-- 10 (I) C.B. & L RAILWAY 11 (A) REDEVELOPMENT AUTHORITY OF JOHNSTOWN 12 TO PURCHASE AND UPGRADE 4,000,000 13 (9) (10) Carbon County <-- 14 (i) Chestnut Ridge Railway 15 (A) Rehabilitation of yard trackage at the 16 Zinc Corporation facility 248,000 17 (9.1) (11) Carbon and Luzerne Counties <-- 18 (i) Rehabilitation of the Reading, Blue 19 Mountain and Northern Railroad between 20 Dupont and White Haven including 21 replacement of 19 miles of welded rail, 22 replacement of deteriorating ties, 23 resurface railbed, renew road crossings, 24 adjust track alignment and other 25 miscellaneous rehabilitation on both tracks 26 to a minimum FRA Class II Track Standards 4,500,000 27 (ii) Rehabilitation of the Reading, Blue 28 Mountain and Northern Railroad's Track 1 29 between Lehighton and M & H Junction to FRA 30 Class 1 Track Standards and Track 2 between 19970S0188B1351 - 81 -
1 Laurel Run and Dupont to FRA Class I Track 2 Standards 360,000 3 (10) (12) Carbon, Luzerne, Lackawanna and Wyoming <-- 4 (i) Lehigh Middle Cluster 5 (A) Rehabilitation of 93 miles of track 450,000 6 (11) (13) Carbon and Schuylkill Counties <-- 7 (i) Rehabilitation of railroad tracks 8 connecting the Boroughs of Lansford and 9 Tamaqua 700,000 10 (12) (14) Centre County <-- 11 (i) SEDA-COG Whiterock Quarry track 12 (A) Track rehabilitation and construction 1,400,000 13 (13) (15) Chester County <-- 14 (i) Brandywine Valley Railroad 15 (A) Elevate track and construct retaining <-- 16 wall to prevent continual washouts from 17 Brandywine Creek in South Coatesville 405,000 18 (A) HERITAGE RAIL LINK, REHABILITATION OF <-- 19 RAILROAD FROM COATESVILLE TO MODENA 75,000 20 (II) DELAWARE VALLEY RAILWAY 21 (A) HERITAGE RAIL LINK, CONSTRUCTION OF 22 MENDENHALL PASSING TRACK 80,000 23 (B) HERITAGE RAIL LINK, RECONSTRUCTION OF 24 RAILWAY BETWEEN MENDENHALL AND KENNETT 25 SQUARE INCLUDING KENNETT SQUARE PASSING 26 TRACK 128,000 27 (C) HERITAGE RAIL LINK RECONSTRUCTION OF 28 POCOPSON PASSING TRACK 33,000 29 (D) HERITAGE RAIL LINK, RECONSTRUCTION OF 30 RAILWAY BETWEEN BRANDYWINE MUSEUM AND 19970S0188B1351 - 82 -
1 CHADDS FORD 30,000 2 (III) HERITAGE RAIL LINK 3 (A) REHABILITATION OF STATIONS AND PARKING 4 AREAS IN COATESVILLE, NORTHBROOK, 5 CHADDS FORD, MENDENHALL AND KENNETT 6 SQUARE 155,000 7 (IV) HERITAGE TRAIN THROUGH COATESVILLE, 8 UTILIZING TRACKAGE THROUGH LUKENS STEEL 9 CORPORATION INCLUDING CAPITAL IMPROVEMENTS 10 AND OPERATIONS 1,232,000 11 (14) (16) Clinton, Centre and Blair Counties <-- 12 (i) SEDA-COG Joint Rail Authority 13 (A) Nittany and Bald Eagle Railroad 14 Rehabilitation 3,000,000 15 (B) Commonwealth supported rail welding 16 project 3,000,000 17 (15) (17) Dauphin County <-- 18 (i) Replacement of rail bridge over a canal on 19 Front Street in Borough of Steelton 188,000 20 (16) (18) Elk County <-- 21 (i) Genesee and Wyoming BUFFALO AND PITTSBURGH <-- 22 Railroad 23 (A) Johnsonburg to New York State Line 3,200,000 24 (17) (19) Erie and Crawford Counties <-- 25 (i) Allegheny and Eastern Railroad, Inc. <-- 26 (A) From Milepost 8 to Milepost 19, 27 rehabilitation and upgrade of 11 miles 28 of Allegheny and Eastern Railroad used 29 for traffic moving to or from Conrail 30 interchange at Erie. Includes 19970S0188B1351 - 83 -
1 rehabilitation of rails, new ties and 2 other roadbed improvements 275,000 3 (ii) (I) Northwestern Pennsylvania Railroad <-- 4 (A) Upgrade of rail line to Federal 5 Railway Administration Class II 6 condition 250,000 7 (18) (20) Fayette County <-- 8 (i) Completion of CSX rail acquisition in 9 Fayette County 1,800,000 10 (ii) Southwest Pennsylvania Rail 11 Rehabilitation Program 1,200,000 12 (iii) Fay-Penn Transportation Company 13 (A) Rehabilitation of 21.6 miles of rail 14 line from Fair Chance Business Park to 15 Mt. Pleasant in Westmoreland County 750,000 16 (21) GREENE COUNTY <-- 17 (I) GREENE COUNTY INDUSTRIAL DEVELOPMENT 18 AUTHORITY 19 (A) CONSTRUCTION OF A SPUR TO SERVE 20 AIRPORT INDUSTRIAL PARK 1,000,000 21 (19) (22) Indiana County <-- 22 (i) Genesee and Wyoming Railroad <-- 23 (A) Punxsutawney to Falls Creek 1,000,000 24 (ii) (I) Pittsburgh and Shawmut Railroad <-- 25 (A) Rehabilitation of Pittsburgh and 26 Shawmut Railroad between Driftwood and 27 Kittanning, including replacement of 28 21,797 feet of rail, replacement of 29 deteriorating ties, resurface rail bed, 30 renew road crossings and other 19970S0188B1351 - 84 -
1 miscellaneous rehabilitation 1,500,000 2 (23) LACKAWANNA COUNTY <-- 3 (A) PURCHASE AND REHABILITATION OF 6 MILES 4 OF THE FORMER LAUREL LINE TRACKAGE FROM 5 DOWNTOWN SCRANTON TO THE BOROUGH OF 6 MOOSIC 4,500,000 7 (BASE PROJECT ALLOCATION - $3,750,000) 8 (DESIGN AND CONTINGENCIES - $750,000) 9 (B) ROLLING STOCK FOR LAUREL LINE 10 PASSENGER SERVICE 6,000,000 11 (BASE PROJECT ALLOCATION - $5,000,000) 12 (DESIGN AND CONTINGENCIES - $1,000,000) 13 (24) LACKAWANNA COUNTY RAILROAD AUTHORITY 14 (A) REHABILITATION OF BRIDGE 60 IN THE 15 CITY OF SCRANTON 3,360,000 16 (BASE PROJECT ALLOCATION - $2,800,000) 17 (DESIGN AND CONTINGENCIES - $560,000) 18 (B) PURCHASE OF LOCOMOTIVES AND ROLLING 19 STOCK TO PROVIDE COMMUTER SERVICE 20 BETWEEN THE CITY OF SCRANTON AND NEW 21 YORK CITY 9,600,000 22 (BASE PROJECT ALLOCATION - $8,000,000) 23 (DESIGN AND CONTINGENCIES - $1,600,000) 24 (20) (25) Lancaster County <-- 25 (i) Construction of new 1,262-foot siding for <-- 26 cold storage facility 125,000 27 (I) ROSENBERGER COLD STORAGE COMPANY <-- 28 (A) CONSTRUCTION OF NEW 1,262-FOOT SIDING 29 FOR COLD STORAGE FACILITY 250,000 30 (II) INTERMODAL TERMINAL <-- 19970S0188B1351 - 85 -
1 (A) CONSTRUCTION OF AN INTERMODAL TERMINAL 2 IN LANCASTER COUNTY 250,000 3 (26) LAWRENCE COUNTY 4 (I) CSX RAILWAY 5 (A) LAWRENCE COUNTY ACQUISITION OF CSX 6 LINE FROM NEW CASTLE JUNCTION TO 7 ELLWOOD CITY (11.5 MILES) 3,100,000 8 (21) (27) Mifflin County <-- 9 (i) SEDA-COG Joint Rail Authority 10 (A) Juniata Valley Railroad 11 Reconstruction 3,000,000 12 (22) (28) Monroe County <-- 13 (i) Monroe County Railroad Authority 14 (A) Rehabilitation of 17 miles of rail 15 line to FRA Class III standards 16 including purchase and installation of 17 new crossties, raise, line and surface 18 the entire 17 mile rail line and 19 purchase and install relay rail on 20 various curves on the rail line 861,000 21 (B) Purchase of railroad right-of-way and 22 relay rail on approximately 1.5 miles 23 including a bridge over the Delaware 24 River to allow the final linkage of 25 track between Pennsylvania and New 26 Jersey to reopen the passenger and 27 freight corridor between the Pocono 28 Mountain region of Pennsylvania and New 29 York City 985,000 30 (C) PURCHASE AND REHABILITATE 13 MILES OF <-- 19970S0188B1351 - 86 -
1 CONRAIL TRACKAGE BETWEEN ANALOMINK AND 2 PORTLAND FOR FREIGHT AND PASSENGER 3 SERVICES 1,400,000 4 (II) INTERMODAL CENTER PROJECT 5 (A) DESIGN AND CONSTRUCTION OF INTERMODAL 6 TRANSPORTATION CENTER IN SMITHFIELD 7 TOWNSHIP AT OR NEAR THE INTERSECTION OF 8 I-80 AND ROUTES 611 AND 191, TO INCLUDE 9 STATION FACILITIES, PARKING, SEWER AND 10 WATER SERVICE AND ACCESS IMPROVEMENTS, 11 PEDESTRIAN WALKWAYS AND RELATED SITE 12 IMPROVEMENTS AND AMENITIES 1,296,000 13 (23) (29) Montgomery County <-- 14 (i) Upper Merion and Plymouth Railroad 15 (A) Add three storage tracks in Plymouth 16 Township and construct a holding/run-a- 17 round track in Upper Merion Township at 18 Swedeland Yard 420,000 19 (ii) Lukens, Inc. <-- 20 (A) Upgrade Lukens Steel Mainline Rail 21 facilities with ties, rails, switch 22 appurtenances and roadbed upgrade from 23 East to West end of plant 440,000 24 (24) (30) Northampton County 25 (i) Construction of siding at Todd Heller 26 site 130,000 27 (25) (31) Northumberland, Montour and Columbia <-- 28 Counties 29 (i) SEDA-COG Joint Rail Authority 30 (A) Stabilize track for the North Shore 19970S0188B1351 - 87 -
1 Railroad to maintain Class II service 375,000 2 (B) Replacement of up to 2,700 crossties, 3 reconstruction of two grade crossings 4 and replacement of bridge timbers 300,000 5 (26) (32) Philadelphia County <-- 6 (i) West Philadelphia Transportation Center 7 (A) Rehabilitation and transformation of 8 the old 52nd and Lancaster Streets rail 9 station into an intermodal 10 transportation center 2,810,000 11 (Base Construction Allocation - 12 $2,300,000) 13 (Design and Contingencies - $510,000) 14 (ii) Delaware and Hudson Railway Company 15 (A) Philadelphia Naval Base track 16 rehabilitation, rehabilitate running 17 track from CP Penrose to Naval Yard 18 switch and running track and adjacent 19 bulk loading facility, as well as four 20 stub tracks west of Roundhouse 550,000 21 (Base Project Allocation - $495,000) 22 (Design and Contingencies - $55,000) 23 (27) (33) Schuylkill County <-- 24 (i) Reading, Blue Mountain and Northern 25 Railroad 26 (A) Rehabilitate Tamaqua and Mahanoy 27 Tunnels, including strengthening of 28 roof structure, installation of 29 drainage system and renewing the rail, 30 ties and ballast in the 900-foot 19970S0188B1351 - 88 -
1 Tamaqua Tunnel located 2 miles north of 2 Tamaqua and in the 3,500-foot Mahanoy 3 Tunnel located near Buck Mountain 640,000 4 (B) REHABILITATION OF SHENANDOAH BRANCH <-- 5 TRACK 150,000 6 (C) DESIGN AND CONSTRUCTION OF A LOADING 7 FACILITY EAST OF RAPPAHANOCK CROSSING 175,000 8 (28) (34) Warren County <-- 9 (i) Replacement of crossties from Warren 10 County to the west 300,000 11 (29) (35) Washington County <-- 12 (i) Wheeling & Lake Erie Railway Company 13 (A) Replace, on accelerated safety basis, 14 deck bridge ties and miscellaneous 15 repairs on Mingo Creek Valley Bridge 16 and Pigeon Creek Valley Bridge near 17 Charleroi to accommodate current 18 traffic and future intermodal traffic 19 on Wheeling Main Line between Rook Yard 20 and Connellsville 375,000 21 (Base Project Allocation - $337,000) 22 (Design and Contingencies - $38,000) 23 (B) Emergency repairs needed to support 24 rail infrastructure damaged by water- 25 related hydraulic blowout along 200 26 feet of side hill fill near Charleroi 27 and to repair catastrophic 28 deterioration of subgrade east of 29 Pittsburgh Rook Yard, including 30 rebuilding of lost subgrade, repair of 19970S0188B1351 - 89 -
1 subsidence of various other fills and 2 other rehabilitations to restore 3 customer railroad service and railroad 4 connections east of Pittsburgh 475,000 <-- 5 (Base Project Allocation - $427,000) 6 CONNECTIONS EAST OF PITTSBURGH, <-- 7 INCLUDING REPAIR OF COAL SUBSIDENCE 8 DAMAGE TO ROADBED NEAR MILE POST 31 625,000 9 (BASE PROJECT ALLOCATION - $577,000) 10 (Design and Contingencies - $48,000) 11 (C) EMERGENCY REPAIRS TO BRIDGE ABUTMENTS, <-- 12 BACKWALL AND WING WALLS OF AVELLA 13 BRIDGE AND MISCELLANEOUS REPAIRS TO 14 BRIDGE DECKING INCLUDING TIES AND RAIL 15 REPAIRS 275,000 16 (BASE PROJECT ALLOCATION - $250,000) 17 (DESIGN AND CONTINGENCIES - $25,000) 18 (30) (36) Westmoreland County <-- 19 (i) Westmoreland County Industrial Development 20 Corporation 21 (A) Construction of a spur from site of 22 proposed Sony Glass Plant 163,000 23 (B) Greensburg Cluster/CSX - 24 reconstruction of rail lines 500,000 25 (31) (37) York County <-- 26 (i) Maryland and Pennsylvania Railroad 27 (A) Rehabilitation of Poorhouse Yard rail 28 and turnouts 424,000 29 (B) Accelerated rehabilitation of 2.5 30 miles of original rail on East Branch 19970S0188B1351 - 90 -
1 to avoid derailments and eliminate
2 damage to customer shipments,
3 including, but not limited to, new
4 rail, crossties, improved drainage
5 system and new ballast 704,000
6 (ii) Emons Logistics Services, Inc.
7 (A) Installation of new track system,
8 environmental controls, heating, paving
9 and the construction of bulk intermodal
10 transfer terminal on York Rail
11 including facilities to prevent
12 contamination of project and to protect
13 from inclement weather 1,275,000
14 (iii) York Rail
15 (A) Construction of rail siding to serve
16 new warehouse of York County Industrial
17 Development Corporation 165,000
18 (32) (38) Buffalo and Pittsburgh Railroad <--
19 (i) Additional funds for rehabilitation of
20 various mainline segments of Buffalo and
21 Pittsburgh Railroad to Class III and/or
22 Class II standards
23 (A) Butler to Bruin mainline track road
24 crossing and bridge work
25 rehabilitation 3,000,000
26 (B) Mainline from Falls Creek (DuBois) to
27 Ridgeway 2,300,000
28 (C) Mainline from Ridgeway to Johnsonburg
29 - relocation of B&P track and
30 consolidation of traffic from
19970S0188B1351 - 91 -
1 Johnsonburg to Ridgway 3,925,000 2 (D) Mainline from Eidenau to Punxsutawney 3 - Phase 2 2,575,000 4 (33) (39) Pittsburgh and Shawmut Railroad, Inc. <-- 5 (i) Rehabilitation of rail infrastructure and 6 railroad tracks of various segments of the 7 Pittsburgh and Shawmut Railroad, Inc. 303,000 8 (34) (40) Department of Transportation <-- 9 (I) FOUR COMPLETE HIGH-SPEED, HIGH HORSEPOWER <-- 10 TRAIN SETS BUILT TO NATIONAL RAILROAD 11 PASSENGER CORPORATION (AMTRAK) 12 SPECIFICATIONS AND TO BE PURCHASED OR 13 LEASED AS AN AMENDMENT TO AMTRAK'S BID 14 AWARD FOR NORTHEAST CORRIDOR HIGH SPEED 15 TRANSPORTATION OR BY SEPARATE COMPETITIVE 16 BIDS. THESE TRAIN SETS MAY BE EITHER 17 ELECTRIC OR FOSSIL FUEL TO BE USED ON 18 PENNSYLVANIA'S KEYSTONE CORRIDOR AND 19 ELSEWHERE IN THIS COMMONWEALTH 140,000,000 20 (II) PURCHASE OF SITE AND CONSTRUCTION OF 21 TRANSIT MAINTENANCE FACILITY 10,000,000 22 (III) STATEWIDE COMPREHENSIVE RAIL PASSENGER 23 STRATEGIC PLANNING STUDY 350,000 24 (i) (IV) Rehabilitation and any other repair <-- 25 of flood-related damage to railroad lines. 26 This authorization shall be allocated by 27 the Department of Transportation to the 28 following railroads: Buffalo & Pittsburgh 29 Railroad Company; Holidaysburg & Roaring 30 Springs Railroad; Everett Railroad Company; 19970S0188B1351 - 92 -
1 Towanda & Monroeton Railroad; Allegheny & 2 Eastern Railroad, Inc.; CSX, DELAWARE AND <-- 3 HUDSON RAILWAY, Chestnut Ridge Railway 4 Company; Nittany & Bald Eagle Railroad 5 Company; North Shore Railroad Company; Blue 6 Ridge Industries; Luzerne County Rail 7 Corporation; Pennsylvania Power & Light; 8 Shamokin Valley Railroad Company; 9 Stourbridge Railroad Company; Wellsboro & 10 Corning Railroad Company; Union County 11 Industrial Railroad Company; Oil Creek & 12 Titusville Lines, Inc.; Southwest 13 Pennsylvania Railroad Company; and Maryland 14 & Pennsylvania Railroad Company 1,100,000 <-- 15 & PENNSYLVANIA RAILROAD COMPANY 1,621,000 <-- 16 (V) IMPROVEMENTS TO TRAIN STATION AT MOUNT 17 JOY, LANCASTER COUNTY 100,000 18 (c) Air transportation.--Additional capital projects in the 19 category of transportation assistance projects for air 20 transportation service to which an interest is to be acquired by 21 the Department of Transportation, its successors or assigns, and 22 to be financed by the incurring of debt are hereby itemized, 23 together with their respective estimated financial costs, as 24 follows: Total 25 Project 26 Project Allocation 27 (1) Connellsville Airport, Fayette County <-- 28 (i) Rehabilitation of runway, taxiway and 29 runway lighting 35,000 30 (ii) Expansion of current runway and other 19970S0188B1351 - 93 -
1 airport improvements 17,000,000 2 (2) (1) Clearfield-Jefferson County Regional <-- 3 Airport Authority 4 (i) Renovate Beechwoods Administration 5 Building 150,000 6 (ii) Upgrade and renovate crash, fire and 7 rescue building 15,000 8 (iii) Renovate terminal building 66,000 9 (iv) Renovate Mesa hangar 125,000 <-- 10 (v) Remove contaminated soil at fuel farm 100,000 11 (IV) LEGAL EXPENSES ASSOCIATED WITH <-- 12 ENVIRONMENTAL LITIGATION 100,000 13 (V) PURCHASE BACKHOE FOR MAINTENANCE 40,000 14 (vi) Acquisition of 1,000-gallon jet fuel 15 truck 80,000 16 (vii) Acquisition of disabled passenger lift 20,000 17 (viii) Construction of access road to new T- 18 hangar 50,000 19 (IX) RENOVATION OF EXISTING T-HANGAR FOR <-- 20 AIRCRAFT STORAGE 60,000 21 (X) RELOCATION OF AIRPORT AUTHORITY OFFICES 25,000 22 (3) (2) St. Marys Airport Authority <-- 23 (i) Refurbish existing hangars 89,000 24 (ii) Purchase of grass cutting and landscape 25 equipment 100,000 26 (iii) Construction of new commercial hangar 125,000 27 (iv) Construction of new T-hangar 120,000 28 (v) Construction of new terminal building 160,000 29 (vi) Maintenance equipment 7,000 30 (vii) Storage building and sidewalks 7,000 19970S0188B1351 - 94 -
1 (viii) Unicom radios and weather station 7,000 2 (ix) Sewage system and utilities 300,000 3 (x) Rehab tiedown apron and construct T- 4 hangar 10,000 5 (xi) Storm water management plan 3,000 6 (xii) Snow removal equipment 7,000 7 (xiii) Runway reconstruction and access road 8 relocation 38,000 9 (xiv) Extend runway 700 feet 50,000 10 (xv) Master plan update AWO5 III 10,000 11 (4) (3) Bradford Regional Airport Authority <-- 12 (i) Construct new T-hangar 300,000 13 (ii) Construct corporate hangar 300,000 14 (iii) Replace door on corporate hangar 28,000 15 (iv) Expand snow equipment building, purchase 16 snow plow 12,000 17 (V) ADDITIONAL DEVELOPMENT AND REPAIRS TO <-- 18 AIRPORT 1,200,000 19 (5) (4) Corry Lawrence Airport Authority <-- 20 (i) Perimeter fencing and snow removal 21 equipment 22,000 22 (ii) Construct new aircraft hangar 198,000 23 (iii) Construct addition to terminal building 83,000 24 (iv) Seal coat runway, taxiways, apron and 25 paint markings 60,000 26 (v) Expand parking area 28,000 27 (vi) Property acquisition 35,000 28 (vii) Snow removal equipment 4,000 29 (viii) Purchase backhoe 21,000 30 (ix) Construct hangar taxiway 8,000 19970S0188B1351 - 95 -
1 (x) Master plan update 1,000 2 (xi) Rotating beacon 4,000 3 (xii) Construct hangars 263,000 4 (xiii) Purchase crack sealing machine 26,000 5 (xiv) Obstruction removal 2,000 6 (6) (5) Fayette County Airport Authority <-- 7 (i) Expansion Project 17,000,000 8 (ii) Fayette County Air Transportation 9 Strategic Planning Study 100,000 10 (III) REHABILITATION OF RUNWAY, TAXIWAY AND <-- 11 RUNWAY LIGHTING 100,000 12 (7) (6) Reading Regional Airport Authority <-- 13 (i) Renovation and widening of Leisz's Bridge 14 and Mitchell Roads 1,000,000 15 (ii) Construction of a noise barrier wall 16 around the run-up area 50,000 <-- 17 AROUND THE RUN-UP AREA 100,000 <-- 18 (iii) Purchase airfield turf maintenance 19 equipment 125,000 20 (iv) Purchase airfield and property CAD 21 system 25,000 22 (V) RENOVATION OF FISHER ROAD 100,000 <-- 23 (8) (7) Westmoreland County Airport, Westmoreland <-- 24 County 25 (i) Modernization of the main terminal 26 building and expansion of the commercial 27 service wing and parking 1,800,000 <-- 28 SERVICE WING AND PARKING 3,300,000 <-- 29 (II) LAND ACQUISITION AND DEVELOPMENT OF AIR 30 INDUSTRIAL PARK 2,500,000 19970S0188B1351 - 96 -
1 (9) (8) Lancaster Airport <-- 2 (i) Terminal expansion 337,000 3 (10) (9) Bedford County Air Industrial Authority <-- 4 (i) Lengthening of runway/taxiway and building 5 of an access road 378,000 6 (11) (10) Blair County Airport Authority <-- 7 (i) Lengthening and strengthening of runways 22,000,000 8 (II) BLAIR COUNTY AIR TRANSPORTATION STRATEGIC <-- 9 PLANNING STUDY 120,000 10 (12) (11) Huntingdon County <-- 11 (i) Acquisition and improvements to the 12 existing airport 1,200,000 13 (13) (12) Venango Regional Airport <-- 14 (i) Property acquisition 35,000 15 (ii) Snow removal equipment 4,000 16 (iii) Purchase backhoe 21,000 17 (iv) Construct hangar taxiway 8,000 18 (v) Master plan update 1,000 19 (vi) Rotating beacon 4,000 20 (vii) Construct hangars 263,000 21 (viii) Purchase crack sealing machine 26,000 22 (ix) Obstruction removal 2,000 23 (X) ACQUIRE 3,000 GALLON JET REFUELER 90,000 <-- 24 (XI) REFURBISH COUNTY HANGAR NO. 6 175,000 25 (XII) INSTALL NEW HANGAR DOOR ON COUNTY HANGAR 26 NO. 7 40,000 27 (XIII) T-HANGAR TAXIWAY PHASE II 120,000 28 (XIV) CONSTRUCT HANGAR AND HELIPAD 375,000 29 (XV) REPAIR WIND SPEED AND DIRECTION 30 INDICATOR 2,000 19970S0188B1351 - 97 -
1 (XVI) INSTALL UNICOM RADIO BASE STATION 5,000 2 (14) (13) Allegheny County Airport <-- 3 (i) Rehabilitation of runway 5-23, hangar 40, 4 taxiways and construction of new hangars 5,575,000 5 (15) (14) Beaver County Airport <-- 6 (i) Navigational aids update - relocate 7 compass rose, lighted wind cone, beacon and 8 AWOS 200,000 9 (ii) High intensity runway lights and medium 10 intensity taxiway lights 400,000 11 (iii) Construction of T-hangar - four to ten 12 single-hangar and twin-hangar units 920,000 13 (iv) Terminal expansion 500,000 14 (v) Resurface main apron 600,000 15 (vi) Apron and taxiway rehabilitation 667,000 16 (vii) Storm water management system 556,000 17 (viii) Resurface parking areas 200,000 18 (16) (15) Bradford County <-- 19 (i) Airport at Towanda 20 (A) Construction of T-hangars 150,000 21 (17) (16) Northumberland/Montour Airport <-- 22 Commission 23 (i) Land acquisition 100,000 24 (ii) Runway improvements 1,000,000 25 (17) CHESTER COUNTY, G.O. CARLSON AIRPORT <-- 26 (I) STRATEGIC PLANNING STUDY 120,000 27 (18) MIDSTATE AIRPORT 28 (I) CONSTRUCTION OF 40 T-HANGAR UNITS 1,040,000 29 (19) GRAND CANYON STATE AIRPORT, TIOGA COUNTY 30 (I) CONSTRUCTION OF 20 HANGARS 500,000 19970S0188B1351 - 98 -
1 (BASE PROJECT ALLOCATION - $400,000) 2 (DESIGN AND CONTINGENCIES - $100,000) 3 (20) MONTOURSVILLE, WILLIAMSPORT LYCOMING AIRPORT 4 (I) AIRPORT RUNWAY EXTENSION 7,500,000 5 (II) AIRPORT ACCESS ROAD FROM I-80 TO AIRPORT 7,500,000 6 (21) LACKAWANNA AND LUZERNE COUNTIES - WILKES- 7 BARRE/SCRANTON INTERNATIONAL AIRPORT 8 (I) CONSTRUCTION OF A NEW PASSENGER TERMINAL 9 BUILDING, TERMINAL APRON, AIR TRAFFIC 10 CONTROL TOWER, AIRCRAFT RESCUE/FIREFIGHTING 11 BUILDING, PARKING FACILITY, INFRASTRUCTURE 12 AND ALL RELATED PROJECTS 15,000,000 13 (22) PITTSBURGH INTERNATIONAL AIRPORT 14 (I) ENHANCED TRANSIT SYSTEM, SHUTTLE SYSTEM 15 AND SIGNAGE BETWEEN LANDSIDE AND AIRSIDE 16 TERMINALS 4,000,000 17 (23) WASHINGTON COUNTY AIRPORT 18 (I) ELECTRONIC GUIDANCE SYSTEM FOR INCLEMENT 19 WEATHER OPERATIONS 250,000 20 (II) COMPLETION OF INSTRUMENT LANDING SYSTEM 1,500,000 <-- 21 (III) LAND ACQUISITION, DEVELOPMENT AND 22 EXPANSION OF ON-BASE OPERATIONS 4,000,000 23 (II) COMPLETION OF INSTRUMENT LANDING SYSTEM <-- 24 AND EXPANSION OF ON-BASE OPERATIONS 1,500,000 25 (24) SOMERSET COUNTY AIRPORT, SOMERSET COUNTY 26 (I) CONSTRUCTION OF NEW TERMINAL BUILDING, 27 INCLUDING ARCHITECTURE AND ENGINEERING 28 COSTS 527,000 29 (II) FURNITURE AND EQUIPMENT 33,000 30 (III) RESURFACING PARKING AREA 56,000 19970S0188B1351 - 99 -
1 (25) CENTRE COUNTY 2 (I) RENOVATION AND EXPANSION OF UNIVERSITY 3 PARK AIRPORT 1,240,000 4 (26) CAMBRIA COUNTY AIRPORT 5 (I) INFRASTRUCTURE IMPROVEMENTS 1,500,000 6 Section 6. Itemization of redevelopment assistance projects. 7 Additional capital projects in the category of redevelopment 8 assistance projects for capital grants by the Department of 9 Community and Economic Development, its successors or assigns, 10 authorized under the provisions of the act of May 20, 1949 11 (P.L.1633, No.493), known as the Housing and Redevelopment 12 Assistance Law, and redevelopment assistance capital projects 13 and to be financed by the incurring of debt, are hereby 14 itemized, together with their estimated financial costs, as 15 follows: 16 Total 17 Project 18 Project Allocation 19 (1) Adams County 20 (i) Development of historic pathway on Lincoln 21 Square, Borough of Gettysburg 5,100,000 <-- 22 SQUARE, BOROUGH OF GETTYSBURG 7,350,000 <-- 23 (2) ALLEGHENY COUNTY 24 (I) CITY OF PITTSBURGH 25 (A) SENATOR JOHN HEINZ PITTSBURGH REGIONAL 26 HISTORY CENTER - COMPLETION OF THE 27 DEVELOPMENT OF SENATOR JOHN HEINZ 28 PITTSBURGH REGIONAL HISTORY CENTER 5,000,000 29 (B) PITTSBURGH TECHNOLOGY CENTER SITE 30 DEVELOPMENT - CONTINUED DEVELOPMENT AND 19970S0188B1351 - 100 -
1 EXPANSION OF THE PITTSBURGH TECHNOLOGY 2 CENTER TO INCLUDE THE LTV SITE ON THE 3 SOUTHSIDE 38,000,000 4 (C) THREE RIVERS STADIUM ENHANCEMENTS 75,000,000 5 (D) GREATER PITTSBURGH COMMUNITY FOOD 6 BANK 1,000,000 <-- 7 BANK 3,000,000 <-- 8 (E) Fifth Avenue, Forbes Avenue and Wood 9 Street, infrastructure acquisition, 10 demolition, reconstruction and public 11 space improvements 20,000,000 12 (F) Nine Mile Run, environmental 13 reclamation and site preparation 20,000,000 14 (G) Life Science Development Incubator, 15 infrastructure improvements 10,000,000 16 (H) Software Product Development Center, 17 land acquisition and infrastructure 18 improvements 10,000,000 19 (I) Rockwell Site Development 10,000,000 20 (J) Byham Theater, Phase III renovation 3,500,000 21 (K) For the acquisition and renovation of 22 the existing Coraopolis Rail Station 23 for the Coraopolis Railroad Museum 3,000,000 24 (L) Mattress Factory - Federal North 25 Project - Transformation of an adult 26 theater adjacent to Allegheny General 27 Hospital to provide for an area 28 integrating arts, education, commerce 29 and residences 3,500,000 30 (M) Hot metal bridge reconstruction and 19970S0188B1351 - 101 -
1 rehabilitation to connect Pittsburgh 2 Technology Center to the LTV site on 3 the south side 2,500,000 <-- 4 (N) Pittsburgh African-American Museum 1,500,000 5 THE SOUTH SIDE 5,000,000 <-- 6 (N) PITTSBURGH AFRICAN-AMERICAN MUSEUM 7,500,000 7 (O) Pennsylvania Public Law Center 5,500,000 8 (P) Acquisition and rehabilitation of 9 property for programmatic space on 10 Jacksonia Street and Sampsonia Way for 11 the Mattress Factory Art Institution 500,000 12 (Q) Rehabilitation of Pittsburgh Ballet 13 Theater Training Facility 300,000 14 (R) THE MARTIN LUTHER KING, JR. CULTURAL <-- 15 CENTER, CONSTRUCTION OF A BUILDING AS 16 PART OF THE MARTIN LUTHER KING, JR. 17 READING CENTER/MARTIN LUTHER KING, JR. 18 CULTURAL CENTER 5,000,000 19 (S) RENOVATIONS OF THE NEW GRANADA THEATER 20 AS A PERFORMING ARTS THEATER AND 21 RECORDING CENTER 5,000,000 22 (T) RENOVATION OF YWCA DOWNTOWN 23 HEADQUARTERS AND CONSTRUCTION OF INNER- 24 CITY NEIGHBORHOOD YWCA FACILITY 2,000,000 25 (U) REPLACEMENT OF HOMEWOOD-BRUSHTON YWCA 26 BUILDING 200,000 27 (V) PROGRAM FOR FEMALE OFFENDERS FOR THE 28 CONSTRUCTION OF A FACILITY TO HOUSE 29 SERVICE PROGRAMS AND ADMINISTRATIVE 30 OFFICES 700,000 19970S0188B1351 - 102 -
1 (W) HEINZ HALL REPAIRS AND RENOVATIONS 8,000,000 2 (X) CONSTRUCTION OF REGIONAL DESTINATION 3 FACILITIES, AS DEFINED IN SECTION 3013 4 OF THE ACT OF AUGUST 9, 1955 (P.L.323, 5 NO.130), KNOWN AS THE COUNTY CODE. NO 6 LESS THAN 40% OF THE FUNDS SHALL BE 7 USED FOR EXPANSION OF THE DAVID L. 8 LAWRENCE CONVENTION CENTER AND NOT LESS 9 THAN 5% OF THE FUNDS SHALL BE USED FOR 10 PARKS AND THEATERS IN THE CULTURAL 11 DISTRICT 361,000,000 12 (Y) PITTSBURGH SUPERCOMPUTING CENTER 13 NETWORKING EQUIPMENT FOR THE NEXT 14 GENERATION INTERNET INITIATIVE 770,000 15 (Z) PITTSBURGH SUPERCOMPUTING CENTER 16 TECHNICAL VISUALIZATION CAPABILITY FOR 17 PENNSYLVANIA-BASED RESEARCH 18 INSTITUTIONS 820,000 19 (AA) PITTSBURGH SUPERCOMPUTING CENTER DATA 20 STORAGE FACILITY 860,000 21 (BB) NINE MILE RUN GREENWAY DEVELOPMENT <-- 22 PHASES I, II AND III 15,000,000 23 (ii) City of Duquesne 24 (A) Cochrandale Redevelopment, 25 acquisition, demolition and site 26 development 1,200,000 27 (B) Kennywood Site Development, 28 acquisition, and site development 2,000,000 29 (C) Plaza Redevelopment, acquisition and 30 site development 1,000,000 19970S0188B1351 - 103 -
1 (D) City Center of Duquesne entrance, site 2 improvements 600,000 3 (E) REHABILITATION OF BRICK SHED AT CITY <-- 4 CENTER OF DUQUESNE 500,000 5 (F) DUQUESNE STORE HOUSE REHABILITATION 725,000 6 (iii) County projects 7 (A) Tech World Site Development - 8 Development of a technology center near 9 the Greater Pittsburgh International 10 Airport, including site clearance, 11 remediation and infrastructure to 12 support research and development, as 13 well as light industrial developments 190,000,000 14 (B) Homestead Redevelopment/Site 15 Development - New onsite access 16 roadways and related infrastructure to 17 support private development 7,000,000 18 (C) Industrial Center of McKeesport Pipe 19 Mill - Redevelopment of the Pipe 20 Mill building on the site of former 21 USX McKeesport National Works into 22 a multitenant industrial and 23 business facility 5,060,000 24 (D) Keystone Commons Braddock Avenue 25 Intermodal Facility - Development 26 of an intermodal facility to 27 relieve traffic and parking 28 congestion on the redevelopment 29 site of the former Westinghouse 30 East Pittsburgh Plant 4,000,000 19970S0188B1351 - 104 -
1 (E) Working Steel Museum - Construction of 2 a tourism attraction reflecting the 3 history of steelmaking in southwestern 4 Pennsylvania 25,000,000 5 (F) McKees Point II - Site improvements at 6 McKees Point to enhance improvements 7 undertaken in Phase I 1,500,000 <-- 8 UNDERTAKEN IN PHASE I 2,500,000 <-- 9 (G) 301 Fifth Avenue Building - Renovation 10 activities on publicly owned building 11 in downtown McKeesport that serves as a 12 center for social and public services 13 and job creation 1,000,000 14 (H) Lysle Boulevard and Sixth Avenue 15 Parking Garages - Renovation of two 16 multistory parking garages in downtown 17 McKeesport 1,500,000 18 (I) Neighborhood Preservation 19 Market/Walnut Corridor - Acquisition of 20 blighted, tax delinquent properties in 21 the Market/Walnut Corridor, demolition 22 of blighted structures and abandoned 23 public housing facility in conjunction 24 with State Route 148 improvements, 25 Yough River Trail and new development 26 in this area 1,000,000 27 (J) Development initiatives at various 28 sites in Allegheny County/Pittsburgh 29 International Airport Area 50,000,000 30 (K) Steel Valley Redevelopment Project 6,262,000 19970S0188B1351 - 105 -
1 (L) Findlay Connector 3,000,000 2 (M) Pittsburgh International Airport 3 enhanced transit system 5,000,000 4 (N) Carnegie Mall Project 1,600,000 5 (O) Parkway West and Interstate 79 6 interchange completion 15,000,000 7 (P) Renovations to Soldiers and Sailors <-- 8 Memorial Hall of Allegheny County 5,000,000 9 (P) SOLDIERS AND SAILORS MEMORIAL HALL OF <-- 10 ALLEGHENY COUNTY 6,000,000 11 (REPLACEMENT AND RESTORATION OF TERRA 12 COTTA ROOF TILES AND REMOVAL OF 13 ASBESTOS - $5,000,000) 14 (RESTORATION, REPAINTING AND RESETTING 15 OF STONE PLATES - $1,000,000) 16 (Q) KEYSTONE COMMONS, CONSTRUCTION OF 17 PASSIVE FLOODWALL FROM CONRAIL OVERPASS 18 TO ABUTMENT ADJACENT TO THOMPSON RUN 950,000 19 (R) SCOTT TOWNSHIP - SEWER RECONSTRUCTION 20 PROJECTS 7,500,000 21 (S) CONSTRUCTION OF ALLEGHENY COUNTY 22 SANITATION PLANT 30,000,000 23 (T) DEVELOPMENT OF SITE INFRASTRUCTURE AND 24 EXPANSION OF DINOSAUR HALL AT CARNEGIE 25 MUSEUM OF NATURAL HISTORY 15,000,000 26 (U) BUILDING RENOVATIONS AND DEVELOPMENT 27 AND CONSTRUCTION OF "FUTURE LAB: THE 28 REGIONAL TECHNOLOGY CENTER" ON CARNEGIE 29 SCIENCE CENTER PROPERTIES 8,500,000 30 (V) EXTERIOR PRESERVATION AND 19970S0188B1351 - 106 -
1 REFURBISHMENT OF HISTORIC CARNEGIE 2 MUSEUMS OF PITTSBURGH, OAKLAND 3 FACILITY 5,500,000 4 (W) ENERGY CONSERVATION IMPROVEMENTS 5 INCLUDING WINDOW REPLACEMENTS AT THE 6 ANDY WARHOL MUSEUM 500,000 7 (X) ADA ACCESSIBILITY PROJECTS AND OTHER 8 INFRASTRUCTURE IMPROVEMENTS AT HISTORIC 9 BRANCH LIBRARIES OF THE CARNEGIE 10 LIBRARY OF PITTSBURGH 2,200,000 11 (Y) DEVELOPMENT OF A REGIONAL RESOURCE 12 CENTER IN THE HISTORIC ALCOA BUILDING 13 IN DOWNTOWN PITTSBURGH 3,000,000 14 (Z) ACQUISITION OF PROPERTY AND <-- 15 DEVELOPMENT COSTS FOR MUSEUM OF 16 BROADCASTING 1,000,000 17 (iv) West Mifflin Borough 18 (A) Nobile Drive Sanitary Sewer 500,000 <-- 19 (A) NOBILE DRIVE SANITARY SEWER 600,000 <-- 20 (v) Wilkinsburg Borough 21 (A) Renaissance Development Area 300,000 22 (vi) Millvale Borough 23 (A) Millvale riverfront development 2,200,000 24 (B) RENOVATION AND RECONSTRUCTION OF THE <-- 25 BOROUGH MUNICIPAL BUILDING IN ORDER TO 26 MAKE IT HANDICAP ACCESSIBLE UNDER ADA 27 GUIDELINES 450,000 28 (VII) ETNA BOROUGH 29 (A) RECONSTRUCTION AND REHABILITATION OF 30 THE PINE STREET PEDESTRIAN BRIDGE 19970S0188B1351 - 107 -
1 LINKING THE WESTERN PART OF THE BOROUGH
2 WITH THE CENTER OF TOWN 35,000
3 (VIII) ASPINWALL BOROUGH
4 (A) REPLACEMENT OF 100 YEAR OLD WATER LINE
5 ON FOURTH STREET 82,000
6 (REPLACEMENT OF WATER LINE - $42,000)
7 (STREET RECONSTRUCTION - $40,000)
8 (IX) SHARPSBURG BOROUGH
9 (A) RENOVATION AND RECONSTRUCTION OF THE
10 BOROUGH MUNICIPAL BUILDING IN ORDER TO
11 MAKE IT HANDICAP ACCESSIBLE UNDER ADA
12 GUIDELINES 250,000
13 (vii) (X) Scott Township <--
14 (A) Sewer repair along Spring Valley Road
15 and Rock Hill Road 5,895,000
16 (XI) BRADDOCK AND RANKIN <--
17 (A) ACQUISITION AND IMPROVEMENT OF
18 ABANDONED RAIL LINE 350,000
19 (XII) CITY OF MCKEESPORT
20 (A) INDUSTRY ROAD MULTI-OCCUPANCY COMPLEX 1,600,000
21 (3) ARMSTRONG COUNTY
22 (I) FIRE SCHOOL
23 (A) EQUIPMENT AND TRAINING 50,000
24 (4) BEAVER COUNTY
25 (I) CORPORATION FOR ECONOMIC DEVELOPMENT
26 (A) INFRASTRUCTURE IMPROVEMENTS TO
27 ALIQUIPPA SITE 5,000,000
28 (B) DEVELOPMENT OF FORMER B&W SITES 5,000,000
29 (II) ROUTE 18 CORRIDOR
30 (A) COMPLETION OF PLAN FOR IMPROVEMENTS
19970S0188B1351 - 108 -
1 ALONG ROUTE 18 75,000 <-- 2 ALONG ROUTE 18 1,000,000 <-- 3 (III) HOTEL/CONFERENCE CENTER 4 (A) INFRASTRUCTURE IMPROVEMENTS 500,000 <-- 5 (A) INFRASTRUCTURE IMPROVEMENTS 1,000,000 <-- 6 (IV) CO-OP INCUBATOR 7 (A) COMPLETE ROOF REPAIRS TO INCUBATOR 25,000 8 (V) MULTITENANT FACILITY 9 (A) DESIGN AND CONSTRUCT NEW MULTITENANT 10 FACILITY 1,500,000 11 (VI) ALIQUIPPA SCHOOL DISTRICT 12 (A) ROOF REPLACEMENTS FOR FIVE SCHOOL 13 BUILDINGS 1,000,000 14 (VII) INFRASTRUCTURE SITE IMPROVEMENTS AND 15 DEVELOPMENT OF BUSINESS SITES ON ROUTE 60 16 FROM HOPEWELL TOWNSHIP TO CHIPPEWA 17 TOWNSHIP 1,000,000 18 (2.1) (5) Bedford County <-- 19 (i) Bedford Borough 20 (A) Acquisition, development and 21 construction of joint borough/county 22 handicapped accessible office and 23 parking facility 3,500,000 24 (B) ACQUISITION AND RENOVATION OF THE FORD <-- 25 GARAGE 5,000,000 26 (3) (6) Berks County <-- 27 (i) City of Reading 28 (A) Improvements to municipal stadium 200,000 29 (B) RESTORATION OF FRANKLIN STREET TRAIN <-- 30 STATION 3,000,000 19970S0188B1351 - 109 -
1 (C) RESTORATION OF WALLS LEADING TO 2 PAGODA 2,000,000 3 (D) RESTORATION OF EXTERIOR WALLS AND 4 REPLACEMENT OF WINDOWS AT HUGH CARCELLA 5 APARTMENTS LOW-INCOME SENIOR CITIZEN 6 HOUSING 1,000,000 7 (E) CONSTRUCTION OF POLICE ACADEMY ON LAND 8 DONATED BY READING AREA COMMUNITY 9 COLLEGE 10,000,000 10 (F) CONSTRUCTION OF A PIER AT READING AREA 11 COMMUNITY COLLEGE 1,000,000 12 (G) MID-ATLANTIC AIR MUSEUM, ADDITIONAL 13 HANGAR AT AIR MUSEUM IN BERN TOWNSHIP 550,000 14 (H) CONSTRUCTION OF FIRE STATION IN 15 MUHLENBERG TOWNSHIP 160,000 16 (I) CONSTRUCTION OF POLICE STATION FOR 17 CENTRAL BERKS REGIONAL POLICE 18 DEPARTMENT 300,000 19 (4) (7) Blair County <-- 20 (i) County Projects 21 (A) Construction and Development of Blair 22 County baseball field and stadium 10,000,000 <-- 23 COUNTY BASEBALL FIELD AND STADIUM 10,800,000 <-- 24 (B) BLAIR COUNTY HISTORICAL SOCIETY 1,400,000 25 (ii) SR 0220 26 (A) Improve access from SR 0220 along Ski 27 Gap Road to Blue Knob 11,000,000 28 (III) LOGAN TOWNSHIP <-- 29 (A) RESTORATION OF THE LEAP-THE-DIPS 30 HISTORIC ROLLER COASTER 2,400,000 19970S0188B1351 - 110 -
1 (IV) CITY OF ALTOONA 2 (A) REHABILITATION OF THE MISHLER THEATRE 1,600,000 3 (B) FABRICATION OF EXHIBITS FOR THE 4 ALTOONA HERITAGE DISCOVERY CENTER 2,200,000 5 (V) BOROUGH OF HOLLIDAYSBURG 6 (A) CONSTRUCTION OF THE HOLLIDAYSBURG 7 CANAL BASIN PARK PHASE II 3,460,000 8 (iii) (VI) Tyrone Borough <-- 9 (A) Tyrone Historic Railroad Park - Phase 10 I 75,000 11 (iv) (VII) Altoona-Blair County Development <-- 12 Corporation 13 (A) Multi-Modal Industrial Park 14 Distribution Center 3,000,000 15 (B) Altoona-Blair County Air Park - Air 16 Freight/Air Cargo Distribution 17 Facilities 3,500,000 18 (C) Business/Research Park - I-99 Corridor 19 Location 2,500,000 20 (D) Entrepreneurial/Business Resource 21 Center 2,500,000 22 (8) BUTLER COUNTY <-- 23 (I) CITY OF BUTLER 24 (A) INFRASTRUCTURE DEVELOPMENT FOR PULLMAN 25 CENTER 1,500,000 26 (B) DEMOLITION OF OLD CAFETERIA BUILDING 27 AT THE PULLMAN SITE 325,000 28 (C) DEMOLITION OF OLD WOOLWORTH BUILDING 400,000 29 (II) EAST BUTLER BOROUGH 30 (A) IMPROVEMENTS TO BOROUGH BUILDING 150,000 19970S0188B1351 - 111 -
1 (III) CONNOQUENESSING TOWNSHIP
2 (A) ADDITION TO TRUCK ROOM BUILDING 75,000
3 (IV) OAKLAND TOWNSHIP
4 (A) PURCHASE 200 SPEED LIMIT SIGNS 25,000
5 (V) WINFIELD TOWNSHIP
6 (A) ENGINEERING FOR DEVELOPMENT OF PARK
7 AND RECREATION FACILITIES 15,000
8 (B) UPDATE ZONING, SUBDIVISION AND LAND
9 DEVELOPMENT ORDINANCES 10,000
10 (VI) CHICORA BOROUGH
11 (A) SCHOOL CROSSING LIGHTS 8,000
12 (B) CONSTRUCTION OF A 15 FEET BY 25 FEET
13 STORAGE BUILDING 25,000
14 (C) REPLACEMENT OF OBSOLETE WATER LINES 2,000,000
15 (VII) CLINTON TOWNSHIP <--
16 (A) CLINTON TOWNSHIP INDUSTRIAL PARK,
17 REDEVELOPMENT OF FORMER USX SITE 2,500,000
18 (4.1) (9) Cambria County <--
19 (i) Elder Township
20 (A) Construction of access road to the
21 Hastings Industrial Park 600,000
22 (ii) City of Johnstown
23 (A) Renovation of Cambria County War
24 Memorial 15,000,000
25 (B) COMPLETION OF THE POINT STADIUM <--
26 PROJECT 3,000,000
27 (C) BETHLEHEM/CAMBRIA IRON MIXED USE SITE
28 PROJECT 8,000,000
29 (D) REHABILITATION AND UPGRADE OF
30 ABANDONED AND UNDERUTILIZED INDUSTRIAL
19970S0188B1351 - 112 -
1 SITES 1,500,000 2 (E) PHASE II CONSTRUCTION AND EXHIBIT 3 FABRICATION FOR THE JOHNSTOWN HERITAGE 4 DISCOVERY CENTER 8,700,000 5 (F) ACQUISITION AND RENOVATION OF THE 6 CAMBRIA IRONWORKS INTERPRETIVE CENTER 11,000,000 7 (III) COUNTY PROJECT 8 (A) REHABILITATION OF HIGHLAND REGIONAL 9 PARK/HIGHLAND FIELD 51,000 10 (B) JOHNSTOWN INDUSTRIAL PARK RELOCATION 11 OF ALLENBIL ROAD 500,000 12 (5) (10) Chester County <-- 13 (i) Tredyffrin Township 14 (A) Rehabilitation of Strafford Railroad 15 Station 450,000 16 (II) BOROUGH OF PHOENIXVILLE <-- 17 (A) DEVELOPMENT OF FOUNDRY BUILDING 1,500,000 18 (5.1) (11) Clarion County <-- 19 (i) Sligo Borough 20 (A) Drill well and replace main water 21 line 170,000 22 (ii) Paint Township 23 (A) Water line extension 1,400,000 24 (B) Sewer line extension 1,600,000 25 (iii) City of Rimersburg 26 (A) Repair existing water storage tank, 27 erect a larger tank and replace water 28 lines 700,000 29 (B) Replace deteriorated sewer lines and 30 manholes 550,000 19970S0188B1351 - 113 -
1 (12) CLEARFIELD COUNTY <-- 2 (I) COOPER TOWNSHIP 3 (A) IMPROVEMENTS TO FACILITIES AT 4 INDUSTRIAL PARK 2,000,000 5 (II) CLEARFIELD BOROUGH 6 (A) RENOVATIONS AND REHABILITATION OF 7 HISTORIC STRUCTURES 1,000,000 8 (III) CURWENSVILLE BOROUGH 9 (A) IMPROVEMENTS AND RENOVATIONS OF 10 DOWNTOWN AREAS 1,000,000 11 (IV) OSCEOLA MILLS BOROUGH 12 (A) IMPROVEMENTS AND RENOVATIONS TO 13 DOWNTOWN AREAS 1,000,000 14 (V) HOUTZDALE BOROUGH 15 (A) IMPROVEMENTS AND RENOVATIONS TO 16 DOWNTOWN AREAS 1,000,000 17 (13) COLUMBIA COUNTY 18 (I) TOWN OF BLOOMSBURG 19 (A) CONSTRUCTION OF CHILDREN'S MUSEUM 400,000 20 (II) COUNTY PROJECT 21 (A) ACQUISITION OF LAND AND DEVELOPMENT OF 22 INDUSTRIAL PARK 3,500,000 23 (14) CUMBERLAND COUNTY 24 (I) CARLISLE BOROUGH 25 (A) CARLISLE HOTEL AND PARKING GARAGE 26 PROJECT 8,300,000 27 (6) (15) Dauphin County <-- 28 (i) City of Harrisburg <-- 29 (I) COUNTY PROJECT <-- 30 (A) DEVELOPMENT AND CONSTRUCTION OF A 19970S0188B1351 - 114 -
1 REGIONAL SPORTS FACILITY 35,000,000 2 (II) CITY OF HARRISBURG 3 (A) Construction and Development of the 4 Pennsylvania Sports Hall of Fame 5 Museum, City Island, Harrisburg 5,525,000 <-- 6 MUSEUM, CITY ISLAND, HARRISBURG 6,300,000 <-- 7 (B) NATIONAL CIVIL WAR AND POST-CIVIL WAR 8 MUSEUM 3,500,000 9 (C) EXPANSION/ADDITIONS TO RIVERSIDE 10 STADIUM 4,000,000 11 (D) THE CAPITAL CIVIC ARENA AND EXPOSITION 12 CENTER 21,800,000 13 (E) PAXTON COMMONS IMPROVEMENTS TO SITE 14 AND PUBLIC AREA 2,800,000 15 (F) THE WHITAKER CENTER FOR THE ARTS AND 16 SCIENCE 5,000,000 17 (16) DELAWARE COUNTY 18 (I) PRESERVATION OF BRANDYWINE BATTLEFIELD 10,000,000 19 (7) (17) Erie County <-- 20 (i) City of Erie 21 (A) Construction of the Pennsylvania 22 Aquarium 15,000,000 23 (B) Renovations of and improvements to the 24 Erie Zoo and Discover Asia Zoo 1,600,000 25 (C) Downtown commercial revitalization 1,000,000 26 (D) Erie Art Museum Expansion 625,000 27 (E) BOSTON STORE REHABILITATION 13,000,000 <-- 28 (F) TRANSPORTATION INFRASTRUCTURE AND 29 GENERAL CONSTRUCTION IN ENTERPRISE 30 ZONE 530,000 19970S0188B1351 - 115 -
1 (G) CONSTRUCTION OF A NEW COMMUNITY 2 CORRECTIONS CENTER 2,500,000 3 (H) CONSTRUCTION AND IMPROVEMENTS TO 4 DISCOVERY SQUARE 2,000,000 5 (I) ERIE ZOOLOGICAL SOCIETY 15,550,000 6 (RENOVATIONS AND EXHIBIT SUPPLIES - 7 $550,000) 8 (RIVERS OF WORLD AQUATIC EXHIBIT - 9 $15,000,000) 10 (ii) County Project 11 (A) Improvements to Fairview Industrial 12 Park 3,825,000 13 (iii) Greater Erie Industrial Development 14 Corporation 15 (A) Development of Knowledge Park at I- <-- 16 90/Station Road Interchange 7,273,000 17 I-90/STATION ROAD INTERCHANGE 8,500,000 <-- 18 (B) ERIE COUNTY LIBRARY 1,000,000 19 (IV) ERIE PORT AUTHORITY <-- 20 (A) INFRASTRUCTURE IMPROVEMENTS TO EAST 21 SIDE WATERFRONT 1,000,000 22 (8) (18) Fayette County <-- 23 (i) City of Uniontown 24 (A) Fayette County Cultural Heritage 25 Project 5,000,000 26 (B) Uniontown Parking Project 900,000 27 (C) BROWNVILLE WHARF AND RIVERSIDE <-- 28 PROJECT 600,000 29 (ii) County Projects 30 (A) Construction of a Coal and Coke 19970S0188B1351 - 116 -
1 Interpreting Center 3,000,000 2 (B) Industrial Park Project 1,700,000 <-- 3 (B) INDUSTRIAL PARK PROJECT 3,000,000 <-- 4 (C) Infrastructure Expansion Project 6,500,000 5 (D) Fayette County Courthouse Renovations 500,000 6 (E) CONSTRUCTION OF EDUCATIONAL <-- 7 INTERPRETATIVE CENTER AT FORT NECESSITY 8 AS PART OF NATIONAL ROAD HERITAGE PARK 6,000,000 9 (iii) Fayette County Redevelopment Authority 10 (A) Fayette County Cultural Heritage 11 Project 4,800,000 12 (B) Fayette County Infrastructure 13 Development Project 9,000,000 14 (C) Fayette County Multiple Occupancy 15 Building and Incubator Project 2,100,000 16 (D) Fayette County Visitor Center Project 650,000 17 (E) Fayette County Industrial Park 18 Project 1,700,000 <-- 19 PROJECT 3,000,000 <-- 20 PROJECT 4,000,000 <-- 21 (F) Laurel Highlands Signage Project 500,000 22 (iv) Connellsville Redevelopment Authority 23 (A) Connellsville Redevelopment Project 1,000,000 24 (19) FOREST COUNTY <-- 25 (I) SITE PREPARATION FOR THE HUNTING AND 26 FISHING MUSEUM 150,000 27 (8.1) (20) Fulton County <-- 28 (a) Acquisition and development of 29 industrial park 1,500,000 <-- 30 INDUSTRIAL PARKS 3,500,000 <-- 19970S0188B1351 - 117 -
1 (21) GREENE COUNTY
2 (I) COUNTY PROJECT
3 (A) GREENE COUNTY AIRPORT INDUSTRIAL PARK
4 DEVELOPMENT 5,000,000
5 (B) MOUNT MORRIS INDUSTRIAL PARK SITE
6 PREPARATION AND INFRASTRUCTURE
7 DEVELOPMENT 500,000
8 (22) INDIANA COUNTY
9 (I) FIRE SCHOOL
10 (A) EQUIPMENT AND TRAINING 50,000
11 (II) COUNTY PROJECT
12 (A) SALTSBURG BOROUGH CANAL PARK PROJECT 4,527,000
13 (22.1) JUNIATA COUNTY <--
14 (I) RICHFIELD AREA JOINT AUTHORITY
15 (A) SEWER AND WATER PROJECT IN MONROE
16 TOWNSHIP 7,000,000
17 (II) WALKER TOWNSHIP SUPERVISORS
18 (A) SEWER CONSTRUCTION PROJECT 2,000,000
19 (9) (23) Lackawanna County <--
20 (i) City of Carbondale
21 (A) Renovate Carbondale City Hall and
22 courthouse 500,000
23 (B) CONSTRUCTION OF A WOMEN AND FAMILY <--
24 ECONOMIC AND SOCIAL ISSUES CENTER AT
25 MARYWOOD COLLEGE, INCLUDING LAND 7,700,000
26 (BASE PROJECT ALLOCATION - $6,500,000)
27 (DESIGN AND CONTINGENCIES - $1,200,000)
28 (C) REHABILITATION AND EXPANSION OF
29 LACKAWANNA COUNTY PRISON IN THE CITY OF
30 SCRANTON 9,600,000
19970S0188B1351 - 118 -
1 (BASE PROJECT ALLOCATION - $8,000,000)
2 (DESIGN AND CONTINGENCIES - $1,600,000)
3 (II) CITY OF SCRANTON
4 (A) FOR NEIGHBORHOOD REVITALIZATION, CRIME
5 PREVENTION AND BUSINESS DISTRICT STREET
6 BEAUTIFICATION OF MULBERRY CENTRAL
7 NEIGHBORHOOD 1,000,000
8 (III) ABINGTON TOWNSHIP
9 (A) CONSTRUCTION OF NEW LITTLE LEAGUE
10 FIELDS 50,000
11 (IV) WAVERLY
12 (A) NEW ROOF FOR WAVERLY COMMUNITY HOUSE 300,000
13 (V) COVINGTON TOWNSHIP
14 (A) INFRASTRUCTURE DEVELOPMENT 2,000,000
15 (VI) MOOSIC BOROUGH
16 (A) LIBRARY 600,000
17 (B) ARENA 30,000,000
18 (C) CONSTRUCTION OF RECREATIONAL PAVILION <--
19 IN MONTAGE 2,000,000
20 (VII) KEYSTONE JUNIOR COLLEGE
21 (A) CONSTRUCTION OF NEW COMPUTER CENTER 4,000,000
22 (10) (24) Lancaster County <--
23 (i) City of Manheim
24 (A) Rehabilitation of the Pennsylvania
25 Baptist State Convention Center 4,440,000
26 (Base Construction Allocation -
27 $3,600,000)
28 (Design and Contingencies - $840,000)
29 (II) CITY OF LANCASTER <--
30 (A) LANCASTER BETHEL AME CULTURAL CENTER
19970S0188B1351 - 119 -
1 MUSEUM 7,450,000
2 (BASE PROJECT ALLOCATION - $6,200,000)
3 (LAND ALLOCATION - $1,250,000)
4 (25) LAWRENCE COUNTY <--
5 (I) CITY OF NEW CASTLE
6 (A) TOURIST MARKETPLACE PROJECT 3,000,000
7 (II) NEW BEAVER BOROUGH
8 (A) INSTALLATION OF NEW SEWER LINE FROM
9 WAMPUM BOROUGH TO NEW BEAVER BOROUGH 1,700,000
10 (III) SHENANGO CHINA SITE
11 (A) REDEVELOPMENT OF SITE, INCLUDING
12 ACQUISITION, DEMOLITION, ENVIRONMENTAL
13 CLEANUP AND INSTALLATION OF NEW
14 INFRASTRUCTURE 1,000,000
15 (IV) NESHANNOCK TOWNSHIP
16 (A) ROUTE 60 BUSINESS PARK SITE
17 PREPARATION AND INFRASTRUCTURE
18 IMPROVEMENTS 4,500,000
19 (V) ELLWOOD CITY BOROUGH <--
20 (A) RECONSTRUCTION OF ATHLETIC COMPLEX IN
21 BOROUGH 4,500,000
22 (26) LEHIGH COUNTY
23 (I) ALLENTOWN
24 (A) CONSTRUCTION OF AQUATIC CENTER AT
25 CEDAR CREST COLLEGE 2,500,000
26 (B) HIGH TECHNOLOGY CONFERENCE CENTER 15,000,000 <--
27 (C) ARTS CAMPUS WALKWAY 3,000,000
28 (D) CENTER CITY PARK DEVELOPMENT AND
29 RECONSTRUCTION 250,000
30 (11) (27) Luzerne County <--
19970S0188B1351 - 120 -
1 (i) Wyoming Valley Sanitary Authority 2 (A) Westwater Treatment Plant, 3 construction of an automated hydrated 4 lime system 500,000 5 (B) Rehabilitation and maintenance of 6 individual member municipal sanitary 7 sewer systems 5,000,000 8 (ii) City of Pittston 9 (A) Riverfront Development Project, 10 construction of public boat launch and 11 dock facilities, scull boat house and 12 dock, small-scale marina and ancillary 13 marina facilities, pedestrian walkway 14 and related site improvements 3,000,000 15 (III) COUNTY PROJECTS <-- 16 (A) CONSTRUCTION OF COUNTY CORRECTIONAL 17 FACILITY 5,400,000 18 (BASE PROJECT ALLOCATION - $4,500,000) 19 (DESIGN AND CONTINGENCIES - $900,000) 20 (B) IMPROVEMENTS TO COUNTY LIBRARY 1,300,000 21 (BASE PROJECT ALLOCATION - $1,150,000) 22 (DESIGN AND CONTINGENCIES - $150,000) 23 (28) LYCOMING COUNTY <-- 24 (I) COUNTY PROJECTS 25 (A) LYCOMING COUNTY INDUSTRIAL PARK, 26 CONSTRUCTION 5,000,000 27 (B) FLOOD MITIGATION PROJECT, LYCOMING 28 CREEK AND LOYALSOCK CREEK 250,000 29 (II) CITY OF WILLIAMSPORT 30 (A) BOWMAN FIELD RENOVATION PROJECT 1,500,000 19970S0188B1351 - 121 -
1 (B) ACCESS ROAD TO CONNECT WAHOO DRIVE AND 2 TRENTON AVENUE INCLUDING IMPROVEMENTS 3 TO TRENTON AVENUE AND EXTENSION OF 4 TRENTON AVENUE IN WILLIAMSPORT 5 INDUSTRIAL PARK 7,500,000 6 (C) MARKET STREET RAMP AND IMPROVEMENTS 4,500,000 7 (29) MCKEAN COUNTY 8 (A) CONSTRUCTION OF CONCESSION STAND AND 9 RESTROOM FACILITIES AT KANE AREA SCHOOL 10 DISTRICT ATHLETIC COMPLEX 100,000 11 (B) TECHNOLOGY PLAN FOR COMPLETE COMPUTER 12 HOOK-UP FOR KANE AREA SCHOOL DISTRICT 462,000 13 (30) MERCER COUNTY 14 (I) EAST LACKAWANNOCK TOWNSHIP 15 (A) DEVELOPMENT OF INDUSTRIAL PARK BY 16 EASTERN MERCER COUNTY REGIONAL 17 DEVELOPMENT CORPORATION 2,425,000 18 (31) MONROE COUNTY 19 (I) COUNTY PROJECT 20 (A) DESIGN AND CONSTRUCTION OF AN 21 INTERMODAL CENTER PROJECT NEAR 22 INTERSECTION OF I-80 AND ROUTES 611 AND 23 191, INCLUDING FACILITIES, PARKING, 24 SEWER AND WATER, ACCESS ROADS, 25 PEDESTRIAN WAYS AND SITE IMPROVEMENTS 1,296,000 26 (32) MONTGOMERY COUNTY 27 (I) ABINGTON TOWNSHIP 28 (A) ENGINEERING, ACQUISITION AND 29 CONSTRUCTION OF A TRAIL NETWORK 30 CONNECTING NEIGHBORHOODS, HISTORIC 19970S0188B1351 - 122 -
1 SITES, PARKS AND SHOPPING CENTER 5,000,000 2 (33) NORTHAMPTON COUNTY 3 (I) CITY OF BETHLEHEM 4 (A) CONSTRUCTION OF SMART DISCOVERY 5 CENTER 9,700,000 6 (B) ACQUISITION AND RECONSTRUCTION OF 7 BANANA FACTORY FOR CULTURAL, ART AND 8 COMMUNITY CENTER 750,000 9 (C) HISTORIC BETHLEHEM REDEVELOPMENT 10 PROJECT 1,615,000 11 (II) CITY OF EASTON 12 (A) IMPROVEMENTS, RECONSTRUCTION AND URBAN 13 RENEWAL 1,950,000 14 (12) (34) Northumberland County <-- 15 (i) City of Sunbury 16 (A) Improvements to Hunter House at Fort 17 Augusta 600,000 18 (II) LOWER MAHANOY TOWNSHIP <-- 19 (A) CONSTRUCTION OF ADDITION TO THE 20 TOWNSHIP MUNICIPAL BUILDING 100,000 21 (B) CONSTRUCTION OF A WATER LINE ADDITION 100,000 22 (C) CONSTRUCTION OF A SEWAGE SYSTEM FOR 23 THE LOWER END OF TOWNSHIP 1,500,000 24 (13) (35) Philadelphia County <-- 25 (i) City of Philadelphia 26 (A) Construction of Eastern Regional 27 Police Training Facility 7,500,000 28 (B) Restoration and renovation of the 29 Sedgwick Theater as a multipurpose 30 cultural and arts center 1,200,000 19970S0188B1351 - 123 -
1 (C) City Recreation Department - 2 Renovation of Lonnie Young Recreation 3 Center 1,500,000 4 (D) Schuylkill River Development Council - 5 For site development for Phase III of 6 the Schuylkill River Park project 2,000,000 7 (E) Center for Human Advancement - 8 Challenger Learning Center 9 rehabilitation for the Center for Human 10 Advancement, including the development 11 of the Challenger Learning Center 2,200,000 12 (Base Project Allocation - $1,800,000) 13 (Design and Contingencies - $400,000) 14 (F) Intercultural Family Services - 15 Rehabilitation of the main facility of 16 the Intercultural Family Services 17 Center and construction of a new health 18 services annex 1,350,000 19 (Base Project Allocation - $1,100,000) 20 (Design and Contingencies - $250,000) 21 (G) West Market Revitalization Project - 22 Rehabilitation of West Market Street 23 from 40th to 52nd Street to include 24 retail development, economic 25 development and public improvements 4,220,000 26 (Base Project Allocation - $3,400,000) 27 (Design and Contingencies - $820,000) 28 (H) Shoemaker Family Center - 29 Rehabilitation of the Shoemaker Middle 30 School into a fully restored and 19970S0188B1351 - 124 -
1 technologically equipped educational 2 complex along with a full service 3 family support center 2,080,000 4 (Base Project Allocation - $1,700,000) 5 (Design and Contingencies - $380,000) 6 (I) Structural renovation and installation 7 of fiber technology at the George 8 Institute Free Library 1,465,000 9 (Base Construction Allocation - 10 $1,200,000) 11 (Design and Contingencies - $265,000) 12 (J) Development and construction of a 13 major retail complex in the West 14 Parkside community 5,005,000 15 (Base Construction Allocation - 16 $4,100,000) 17 (Design and Contingencies - $905,000) 18 (K) Revitalization of the Conestoga 19 Recreation Center in West Philadelphia 1,235,000 20 (Base Construction Allocation - 21 $1,000,000) 22 (Design and Contingencies - $ 235,000) 23 (L) Construction of the National 24 Constitution Center on the second block 25 of Independence Mall between Market 26 Street and Arch Street 30,000,000 27 (M) For facility construction and 28 renovations to the Please Touch Museum 5,000,000 29 (N) Enhancements to Veterans Stadium 75,000,000 <-- 30 (O) Continued development for the Avenue 19970S0188B1351 - 125 -
1 of the Arts 20,000,000 2 (P) (N) Construction of a Primate House at <-- 3 the Philadelphia Zoo 3,500,000 4 (Q) (O) Neighborhood Preservation <-- 5 acquisition and development 4,500,000 6 (R) (P) Development Initiatives in <-- 7 Philadelphia County 35,000,000 8 (S) (Q) Fairmount Park Commission - <-- 9 rehabilitation and site development for 10 Schuylkill River 18,000,000 11 (T) (R) Fire and safety rehabilitation for <-- 12 the Philadelphia Art Museum 7,000,000 13 (U) (S) For the development of the Gateway <-- 14 Visitor Center on the Mall in 15 Independence National Historic Park 10,000,000 16 (V) (T) St. Phillip's Community <-- 17 Development Corporation for capital 18 improvement and housing development in 19 North Central Empowerment Zone 500,000 20 (W) (U) Acquisition and renovation of a <-- 21 building on Germantown Avenue to house 22 the Germantown Settlement House 250,000 23 (X) (V) Site Development and Construction <-- 24 of 6701 Germantown Avenue, the site of 25 the Wagon Wheel Inn 500,000 26 (Y) (W) Construction of Regional <-- 27 Performing Arts Center on South Broad 28 Street 20,000,000 29 (Z) (X) Demolition of former naval <-- 30 hospital on Broad and Hartranft <-- 19970S0188B1351 - 126 -
1 Streets 3,000,000 2 BROAD AND HARTRANFT STREETS 8,000,000 <-- 3 (AA) (Y) Chestnut Street Intermodal <-- 4 Improvement Project 4,367,000 5 (BB) (Z) North Broad Street Avenue of the <-- 6 Arts Project -- Gateway Intersection 7 Improvements 7,900,000 8 (CC) (AA) East Falls Ridge Avenue <-- 9 Revitalization Project 2,500,000 10 (DD) (BB) Renovations to Haddington Fire <-- 11 House Senior Services Center 1,100,000 12 (EE) (CC) Renovations to the House of <-- 13 Umoja Crime Prevention and Human 14 Development Institute 2,600,000 15 (FF) (DD) Demolition of Philadelphia Civic <-- 16 Center 10,000,000 17 (EE) COMPLETION AND CONSTRUCTION OF <-- 18 LANCASTER AVENUE REVITALIZATION 19 BUSINESS PROJECT 12,000,000 20 (FF) SOUTH STREET HEADHOUSE DISTRICT 21 REDEVELOPMENT PROJECT 3,000,000 22 (GG) RESURFACING AND REHABILITATION OF 23 COMMERCIAL CORRIDOR LOCATED AT 60TH AND 24 MARKET STREETS FROM SOUTH OF MARKET 25 STREET TO CATHERINE STREET 1,500,000 26 (HH) PHILADELPHIA OPPORTUNITIES 27 INDUSTRIALIZATION CENTER 350,000 28 (II) CONGRESSO DELATINO'S, DEVELOPMENT AND 29 CONSTRUCTION OF COMMUNITY, JOB 30 TRAINING, EDUCATION, HEALTH CARE AND 19970S0188B1351 - 127 -
1 MULTIPLE SOCIAL SERVICES FACILITY 5,000,000 2 (JJ) DEVELOPMENT AND CONSTRUCTION OF PHASE 3 II OF THE SOUTHEASTERN PA REGIONAL 4 EMPLOYMENT AND TRAINING CENTER 15,000,000 5 (KK) "AVENUE OF THE ARTS (NORTH BROAD 6 STREET) - PHILADELPHIA PAN-HELLENIC 7 CHAPTER'S CONFERENCE CENTER" 3,000,000 8 (LL) RELOCATED AFRO-AMERICAN HISTORICAL 9 AND CULTURAL MUSEUM 10,000,000 10 (MM) HISTORIC PHILADELPHIA SOUND AND LIGHT 11 SHOW 7,500,000 12 (NN) DEVELOPMENT OF A MULTIPURPOSE HUNGER 13 RELIEF CENTER IN THE FOOD 14 PHILADELPHIA'S FOOD DISTRIBUTION 15 CENTER 725,000 16 (OO) MAJOR STRUCTURAL RENOVATION TO 17 FRANKLIN INSTITUTE SCIENCE MUSEUM 18 INCLUDING RESTORATION AND MODERNIZATION 19 OF THE HISTORICALLY SIGNIFICANT 1934 20 BUILDING AND SCIENCE EDUCATION FACILITY 21 UPGRADES 30,000,000 22 (PP) REHABILITATION OF ROYAL THEATRE, 23 SOUTH STREET 1,000,000 24 (QQ) MOUNT AIRY REVITALIZATION PROJECT 3,000,000 25 (RR) GREEK ROW PROJECT, NORTH BROAD 26 STREET 3,000,000 27 (SS) POINT BREEZE REVITALIZATION PROJECT 1,000,000 <-- 28 (TT) BYBERRY STATE HOSPITAL SITE 29 DEVELOPMENT 20,000,000 30 (UU) DEFENSE FACILITIES SITE DEVELOPMENT 20,000,000 19970S0188B1351 - 128 -
1 (VV) PENNSYLVANIA CONVENTION CENTER 2 EXPANSION 200,000,000 3 (WW) STADIUM DEVELOPMENT/RENOVATION 200,000,000 4 (XX) ACQUISITION AND RENOVATIONS TO NEW 5 FACILITIES FOR PENNSYLVANIA ACADEMY OF 6 FINE ARTS 6,000,000 7 (YY) POINT BREEZE PERFORMING ARTS CENTER 12,500,000 8 (ZZ) ASSOCIATION OF LATIN AMERICAN 9 MUSICIANS 2,000,000 10 (AAA) WEST PHILADELPHIA PARTNERS FOR ARTS 10,500,000 <-- 11 (AAA) WEST PHILADELPHIA PARTNERS FOR ARTS 13,618,000 <-- 12 (BBB) PHILADELPHIA INTERNATIONAL AIRPORT - 13 CONSTRUCTION OF NEW INTERNATIONAL 14 TERMINAL 12,500,000 15 (CCC) CECIL B. MOORE AVENUE DEVELOPMENT 16 BILLIE HOLLIDAY ART CENTER 1,000,000 17 (DDD) YOUTH MINI-MALL 1,000,000 18 (EEE) GERMANTOWN AVENUE RECONSTRUCTION 19 (7400-7600 BLOCKS) 2,130,000 20 (FFF) GERMANTOWN AVENUE RECONSTRUCTION 21 (5100-5500 BLOCKS) 2,840,000 22 (GGG) WADSWORTH AVENUE STREETSCAPE (1500- 23 1600 BLOCKS) 460,000 24 (HHH) CAPITAL IMPROVEMENTS TO THE ROCK 25 SCHOOL OF PENNSYLVANIA BALLET 1,000,000 26 (III) 60TH BUSINESS DISTRICT PROJECTS 500,000 27 (JJJ) RESURFACING AND REHABILITATION OF 28 COMMERCIAL CORRIDOR LOCATED AT 60TH AND 29 MARKET STREETS FROM SOUTH OF MARKET 30 STREET TO CATHERINE STREET 1,500,000 19970S0188B1351 - 129 -
1 (KKK) REVITALIZATION OF BLUE HORIZON 8,000,000 <-- 2 (LLL) CONSTRUCTION OF A 200-BED FACILITY 3 FOR THE ST. IGNATIUS ASSISTED LIVING 4 PROJECT 3,000,000 5 (MMM) CONSTRUCTION OF THE WEST POWELLTON 6 SENIOR CITIZEN CENTER 3,000,000 7 (NNN) CONSTRUCTION OF AN ANNEX TO THE WEST 8 PHILADELPHIA YMCA 2,000,000 9 (14) (36) Pike County <-- 10 (i) Pike County Center for the Performing 11 Arts 7,500,000 12 (15) (37) Schuylkill County <-- 13 (i) Borough of Tamaqua 14 (A) Improvements to Tamaqua Train Station 250,000 15 (II) SWEET ARROW LAKE <-- 16 (A) RESTORATION OF DAM AND SPILLWAY 1,200,000 17 (III) CITY OF POTTSVILLE 18 (A) GENERAL GEORGE JOULWAN PARK, 19 IMPROVEMENTS TO RECREATIONAL FACILITY 200,000 20 (IV) ORWIGSBURG BOROUGH HISTORICAL SOCIETY 21 (A) BUILDING IMPROVEMENTS 50,000 22 (16) (38) Somerset County <-- 23 (I) COUNTY PROJECTS <-- 24 (A) Somerset County Bicentennial 25 Industrial Park Project 626,000 26 (II) LINCOLN TOWNSHIP <-- 27 (A) SOMERSET HISTORICAL CENTER 28 IMPROVEMENTS 875,000 29 (III) BOROUGH OF WINDBER 30 (A) FABRICATION OF EXHIBITS FOR THE 19970S0188B1351 - 130 -
1 WINDBER COAL HERITAGE CENTER 450,000
2 (39) SULLIVAN COUNTY
3 (A) FUNDING FOR SITE ACQUISITION AND
4 PREPARATION FOR ARCHERY HALL OF FAME IN
5 LAPORTE TOWNSHIP 1,000,000
6 (17) (40) Warren County <--
7 (i) Warren County Development Association
8 (A) Construction of an industrial facility
9 in the Euclid Avenue Industrial Park 500,000
10 (II) WARREN WAR MEMORIAL FIELD <--
11 (A) REHABILITATION AND RESTORATION 2,000,000
12 (41) WASHINGTON COUNTY
13 (I) COUNTY PROJECT
14 (A) RENOVATIONS AND REHABILITATION TO
15 HISTORICALLY PRESERVE FORMER PRISON
16 FACILITY FOR USE AS MODERN OFFICE
17 SPACE 3,250,000
18 (B) ROUTE 22 INDUSTRIAL PARK, LAND
19 ACQUISITION AND DEVELOPMENT 24,000,000
20 (C) SOUTHPOINTE EXPANSION 2,500,000
21 (D) INFRASTRUCTURE IMPROVEMENTS TO THE <--
22 MIDWAY BOROUGH BUSINESS SECTOR 15,000,000
23 (E) CALIFORNIA TECHNOLOGY PARK FOR LAND
24 DEVELOPMENT 1,350,000
25 (F) LAND ACQUISITION, INFRASTRUCTURE AND
26 DEVELOPMENT OF LIGHT INDUSTRIAL PARK
27 ADJACENT TO WASHINGTON COUNTY AIRPORT 4,000,000
28 (II) UNION TOWNSHIP
29 (A) SEWER LINE EXTENSIONS TO SHIRE OAKS
30 AND VILLAGE OF ELRAMA 2,500,000
19970S0188B1351 - 131 -
1 (18) (42) Westmoreland County <-- 2 (i) Rostraver <-- 3 (I) EAST HUNTINGDON TOWNSHIP <-- 4 (A) REHABILITATION OF THE WEST OVERTON 5 MUSEUMS 5,500,000 6 (II) ROSTRAVER 7 (A) Acquisition and/or construction of a 8 combination public library and senior 9 citizen center 2,000,000 10 (III) CITY OF MONESSEN <-- 11 (A) ACQUISITION AND RENOVATION OF BUILDING 12 FOR EXPANSION OF MONESSEN DISTRICT 13 LIBRARY 2,500,000 14 (IV) COUNTY PROJECT 15 (A) JEANNETTE INDUSTRIAL PARK, 16 REDEVELOPMENT OF FORMER GGI GLASS 17 PLANT 2,000,000 18 (B) WESTMORELAND DISTRIBUTION CENTER 1,500,000 19 (C) SOUTH GREENSBURG INDUSTRIAL CENTER 1,000,000 20 (D) PHASE III OF WESTMORELAND BUSINESS AND 21 RESEARCH PARK 700,000 22 (E) RENOVATIONS OF TROUTMAN BUILDING 1,500,000 23 (F) DEVELOPMENT OF WESTMORELAND COUNTY 24 AIRPORT INDUSTRIAL PARK AND RELATED 25 INFRASTRUCTURE 2,500,000 26 (V) GREENSBURG CITY 27 (A) CONSTRUCTION OF THE SETON HILL WOMEN'S 28 BUSINESS CENTER 5,000,000 29 (B) RENOVATION AND EXPANSION OF THE 30 WESTMORELAND MUSEUM OF AMERICAN ART 2,000,000 19970S0188B1351 - 132 -
1 (VI) CITY OF ARNOLD
2 (A) RIVERFRONT DEVELOPMENT IN ARNOLD 600,000
3 (VII) CITIES OF ARNOLD AND NEW KENSINGTON
4 (A) FIFTH AVENUE CORRIDOR NEIGHBORHOOD
5 REHABILITATION INCLUDING DEMOLITION
6 FROM 14TH STREET TO 11TH STREET TO BE
7 REPLACED BY LIGHT INDUSTRIAL AND
8 HOUSING DEVELOPMENT 6,000,000
9 (B) HORNE BOULEVARD DEMOLITION AND SITE
10 DEVELOPMENT NEAR OLD A&P MARKET 400,000
11 (VIII) CITY OF NEW KENSINGTON
12 (A) ALUMINUM MUSEUM IN NEW KENSINGTON 1,000,000
13 (19) (43) York County <--
14 (i) City of York
15 (A) Hoffman Stadium Reconstruction 10,000,000
16 (B) Public improvements in support of the
17 Boundry Avenue redevelopment project 3,300,000
18 (C) George Street two-way conversion
19 project 850,000
20 (D) Mural project infrastructure
21 improvements 1,000,000
22 (E) George Street gateway improvements 600,000
23 (F) Penn and Farquhar Park renovations 500,000
24 (II) RED LION <--
25 (A) LAND ACQUISITION AND CONSTRUCTION OF
26 KALTREIDER LIBRARY 2,000,000
27 Section 7. Itemization of flood control projects.
28 Additional capital projects in the category of flood control
29 projects to be constructed by the Department of Environmental
30 Protection, its successors or assigns, and to be financed by the
19970S0188B1351 - 133 -
1 incurring of debt are hereby itemized, together with their 2 respective estimated costs, as follows: 3 Total 4 Project 5 Project Allocation 6 (1) Department of Environmental Protection $25,456,000 <-- 7 (1) DEPARTMENT OF ENVIRONMENTAL PROTECTION $121,741,000 <-- 8 (1) DEPARTMENT OF ENVIRONMENTAL PROTECTION $122,241,000 <-- 9 (i) Allegheny County 10 (A) Additional funds for Turtle Creek 11 Flood Control Project 383,000 12 (Base Project Allocation - $383,000) 13 (II) ARMSTRONG COUNTY <-- 14 (A) BOROUGH OF FORD CITY, FLOOD CONTROL 15 PROJECT INCLUDING FLOODWALL 1,000,000 16 (B) BOROUGH OF FORD CITY, FLOODWALL HAZARD 17 MITIGATION PROJECT 1,000,000 18 (C) NORTH BUFFALO TOWNSHIP, RAISE ROADBED 19 OF T-314, HOGG ROAD NEAR BONNER CAMP 100,000 20 (ii) (III) Bedford County <-- 21 (A) Borough of Hyndman - Wills Creek 22 Restoration Project 373,000 23 (iii) (IV) Cumberland County <-- 24 (A) Borough of Carlisle Chapel Hill Storm 25 Drainage Project 1,000,000 26 (Base Project Allocation - $900,000) 27 (Design and Contingencies - $100,000) 28 (B) Lower Allen Township - Highland Park 29 Drainage Project 1,240,000 30 (C) Hampden Township - Floodproofing 19970S0188B1351 - 134 -
1 Pinebrook Wastewater Treatment Plant 300,000
2 (Base Project Allocation - $250,000)
3 (Design and Contingencies - $50,000)
4 (V) FAYETTE COUNTY <--
5 (A) FLOOD CONTROL AND RIVERBANK EROSION
6 RESTORATION IN POINT MARION 350,000
7 (VI) ERIE COUNTY
8 (A) CITY OF ERIE, FLOODPROOF WASTEWATER
9 TREATMENT SYSTEM 3,000,000
10 (iv) (VII) Greene County <--
11 (A) Flood mitigation project in Center
12 Township 157,000
13 (B) Flood mitigation project in Jackson
14 Township 188,000
15 (C) Flood mitigation project in Perry
16 Township 500,000
17 (D) Flood mitigation project in Wayne
18 Township 530,000
19 (VIII) LACKAWANNA COUNTY <--
20 (A) CITY OF SCRANTON, NON-FEDERAL SHARE OF
21 $20,269,000. FLOOD CONTROL PROJECT
22 ALONG THE LACKAWANNA RIVER BY THE U.S.
23 ARMY CORPS OF ENGINEERS 5,837,000
24 (BASE PROJECT ALLOCATION - $5,837,000)
25 (B) CITY OF SCRANTON, RAISING OF THE
26 ALBRIGHT STREET BRIDGE OVER THE
27 LACKAWANNA RIVER IN THE CITY OF
28 SCRANTON, INCLUDING, BUT NOT LIMITED
29 TO, ROAD RECONSTRUCTION OF BRIDGES AND
30 APPROACHES TO THE BRIDGES AND BRIDGE
19970S0188B1351 - 135 -
1 REHABILITATION IN CONJUNCTION WITH U.S. 2 ARMY CORPS OF ENGINEERS FLOOD CONTROL 3 PROJECT 1,200,000 4 (BASE PROJECT ALLOCATION - $1,000,000) 5 (DESIGN AND CONTINGENCIES - $200,000) 6 (C) CITY OF SCRANTON, RAISING OF THE 7 POPLAR STREET BRIDGE OVER THE 8 LACKAWANNA RIVER IN THE CITY OF 9 SCRANTON, INCLUDING, BUT NOT LIMITED 10 TO, ROAD RECONSTRUCTION OF BRIDGES AND 11 APPROACHES TO THE BRIDGES AND BRIDGE 12 REHABILITATION IN CONJUNCTION WITH U.S. 13 ARMY CORPS OF ENGINEERS FLOOD CONTROL 14 PROJECT 1,420,000 15 (BASE PROJECT ALLOCATION - $1,200,000) 16 (DESIGN AND CONTINGENCIES - $220,000) 17 (D) CITY OF SCRANTON, RAISING OF THE OLIVE 18 STREET BRIDGE OVER THE LACKAWANNA RIVER 19 IN THE CITY OF SCRANTON, INCLUDING, BUT 20 NOT LIMITED TO, ROAD RECONSTRUCTION OF 21 BRIDGES AND APPROACHES TO THE BRIDGES 22 AND BRIDGE REHABILITATION IN 23 CONJUNCTION WITH U.S. ARMY CORPS OF 24 ENGINEERS FLOOD CONTROL PROJECT 1,200,000 25 (BASE PROJECT ALLOCATION - $1,000,000) 26 (DESIGN AND CONTINGENCIES - $200,000) 27 (E) CITY OF SCRANTON, FLOOD CONTROL 28 PROJECT ON UNNAMED CREEK ADJACENT TO 29 OAKWOOD ESTATES, INCLUDING, BUT NOT 30 LIMITED TO, RETENTION BASINS AND BOX 19970S0188B1351 - 136 -
1 CULVERT UNDER KEYSER AVENUE 1,200,000 2 (BASE PROJECT ALLOCATION - $1,000,000) 3 (DESIGN AND CONTINGENCIES - $200,000) 4 (F) CITY OF SCRANTON, STORM WATER AND 5 FLOOD CONTROL PROJECT IN HIGH WORKS 6 SECTION, INCLUDING, BUT NOT LIMITED TO, 7 STORM SEWERS, ROAD RECONSTRUCTION AND 8 PUMPING STATIONS IN THE AREA INCLUDING 9 FERDINAND STREET, THEODORE STREET, 10 STATION STREET, FULTON STREET, NORTH 11 KEYSER AVENUE AND SWEENEY AVENUE 1,560,000 12 (BASE PROJECT ALLOCATION - $1,300,000) 13 (DESIGN AND CONTINGENCIES - $260,000) 14 (G) CITY OF SCRANTON, STORM WATER AND 15 FLOOD CONTROL PROJECT, INCLUDING, BUT 16 NOT LIMITED TO, STORM SEWERS, ROAD 17 RECONSTRUCTION AND PUMPING STATIONS IN 18 THE AREA INCLUDING DEWEY AVENUE, 19 MERRIFIELD AVENUE, NORTH CAMERON 20 AVENUE, LAFAYETTE STREET, PRICE STREET 21 AND JACKSON STREET 1,600,000 22 (BASE PROJECT ALLOCATION - $1,200,000) 23 (DESIGN AND CONTINGENCIES - $400,000) 24 (H) CITY OF SCRANTON, FLOOD CONTROL AND 25 STORM WATER PROJECT, INCLUDING, BUT NOT 26 LIMITED TO, STORM SEWERS, ROAD 27 RECONSTRUCTION AND PUMPING STATIONS IN 28 THE AREA, INCLUDING EAST PARKER STREET, 29 ELK STREET, CRANE AVENUE AND BOULEVARD 30 AVENUE 1,200,000 19970S0188B1351 - 137 -
1 (BASE PROJECT ALLOCATION - $1,000,000) 2 (DESIGN AND CONTINGENCIES - $200,000) 3 (I) CITY OF SCRANTON, FLOOD CONTROL AND 4 STORM WATER PROJECT, INCLUDING, BUT NOT 5 LIMITED TO, STORM SEWERS AND ROAD 6 RECONSTRUCTION AND PUMPING STATIONS IN 7 THE AREA OF GREEN RIDGE STREET, MARION 8 STREET, GLEN STREET, NAY AUG AVENUE, 9 ROSS AVENUE, GARDNER AVENUE AND 10 ALBRIGHT AVENUE 1,200,000 11 (BASE PROJECT ALLOCATION - $1,000,000) 12 (DESIGN AND CONTINGENCIES - $200,000) 13 (J) CITY OF SCRANTON, FLOOD CONTROL AND 14 STORM WATER PROJECT, INCLUDING, BUT NOT 15 LIMITED TO, STORM SEWERS AND ROAD 16 RECONSTRUCTION AND PUMPING STATIONS IN 17 THE PLOT SECTION 1,920,000 18 (BASE PROJECT ALLOCATION - $1,600,000) 19 (DESIGN AND CONTINGENCIES - $320,000) 20 (K) CITY OF SCRANTON, FLOOD CONTROL AND 21 STORM WATER PROJECT, INCLUDING, BUT NOT 22 LIMITED TO, STORM SEWERS AND ROAD 23 RECONSTRUCTION AND PUMPING STATIONS IN 24 THE BULLS HEAD/WESTON FIELD SECTION 2,800,000 25 (BASE PROJECT ALLOCATION - $2,500,000) 26 (DESIGN AND CONTINGENCIES - $300,000) 27 (L) CITY OF SCRANTON, FLOOD CONTROL AND 28 STORM WATER PROJECT, INCLUDING, BUT NOT 29 LIMITED TO, STORM SEWERS AND ROAD 30 RECONSTRUCTION AND PUMPING STATIONS IN 19970S0188B1351 - 138 -
1 THE AREA OF EAST MARKET STREET, 2 ELECTRIC STREET, NAY AUG AVENUE, ROSS 3 AVENUE AND ROSANNA AVENUE 1,200,000 4 (BASE PROJECT ALLOCATION - $1,000,000) 5 (DESIGN AND CONTINGENCIES - $200,000) 6 (M) CITY OF SCRANTON, FLOOD CONTROL AND 7 STORM WATER PROJECT, INCLUDING, BUT NOT 8 LIMITED TO, STORM SEWERS AND ROAD 9 RECONSTRUCTION AND PUMPING STATIONS IN 10 THE AREA OF THE 400 BLOCK OF LEGGETTS 11 STREET AND ROCKWELL AVENUE 575,000 12 (BASE PROJECT ALLOCATION - $500,000) 13 (DESIGN AND CONTINGENCIES - $75,000) 14 (N) CITY OF SCRANTON - STORM WATER AND 15 FLOOD CONTROL PROJECT, INCLUDING, BUT 16 NOT LIMITED TO, STORM SEWERS, ROAD 17 RECONSTRUCTION AND PUMPING STATIONS, IN 18 AREA KNOWN AS PARK PLACE ALONG 19 LACKAWANNA RIVER FROM ALBRIGHT STREET 20 BRIDGE DOWNSTREAM TO OLIVE STREET 21 BRIDGE 1,800,000 22 (BASE PROJECT ALLOCATION - $1,600,000) 23 (DESIGN AND CONTINGENCIES - $200,000) 24 (O) CITY OF SCRANTON - NON-FEDERAL SHARE 25 OF UNITED STATES ARMY CORPS OF 26 ENGINEERS FLOOD CONTROL DESIGN PROJECT 27 ON LACKAWANNA RIVER FOR PLOT SECTION 28 AND NAY AUG AVENUE SECTION 200,000 29 (P) CITY OF SCRANTON, FLOOD CONTROL 30 PROJECT ALONG LACKAWANNA RIVER, 19970S0188B1351 - 139 -
1 INCLUDING, BUT NOT LIMITED TO, 2 CONSTRUCTION OF LEVEES, PUMPING 3 STATIONS AND ACQUISITION OF PROPERTIES 36,000,000 4 (BASE PROJECT ALLOCATION - $30,000,000) 5 (DESIGN AND CONTINGENCIES - $6,000,000) 6 (Q) BOROUGH OF DUNMORE, FLOOD CONTROL AND 7 STORM WATER PROJECT 6,000,000 8 (BASE PROJECT ALLOCATION - $5,000,000) 9 (DESIGN AND CONTINGENCIES - $1,000,000) 10 (R) BOROUGH OF THROOP, FLOOD CONTROL AND 11 STORM WATER PROJECT 6,000,000 12 (BASE PROJECT ALLOCATION - $5,000,000) 13 (DESIGN AND CONTINGENCIES - $1,000,000) 14 (S) BOROUGH OF TAYLOR, FLOOD CONTROL AND 15 STORM WATER PROJECT 6,000,000 16 (BASE PROJECT ALLOCATION - $5,000,000) 17 (DESIGN AND CONTINGENCIES - $1,000,000) 18 (T) CITY OF SCRANTON, 1300 BLOCK OF 19 WYOMING AVENUE, FLOOD CONTROL AND STORM 20 WATER PROJECT, INCLUDING, BUT NOT 21 LIMITED TO, STORM SEWERS AND ROAD 22 RECONSTRUCTION AND PUMPING STATIONS 500,000 23 (BASE PROJECT ALLOCATION - $420,000) 24 (DESIGN AND CONTINGENCIES - $80,000) 25 (U) BOROUGH OF DUNMORE, FLOOD CONTROL AND 26 STORM WATER PROJECT, INCLUDING, BUT NOT 27 LIMITED TO, STORM SEWERS, SANITARY 28 SEWERS, BACK FLOW PREVENTORS, ROAD 29 RECONSTRUCTION AND PUMPING STATIONS IN 30 THE AREA OF CLAY AVENUE, QUINCY AVENUE, 19970S0188B1351 - 140 -
1 MADISON AVENUE, JEFFERSON AVENUE AND 2 ADAMS AVENUE; MARION STREET, GREEN 3 RIDGE STREET AND ELECTRIC STREET 2,400,000 4 (BASE PROJECT ALLOCATION - $2,000,000) 5 (DESIGN AND CONTINGENCIES - $400,000) 6 (V) BOROUGH OF TAYLOR, FLOOD CONTROL AND 7 STORM WATER PROJECT, INCLUDING, BUT NOT 8 LIMITED TO, STORM SEWERS AND ROAD 9 RECONSTRUCTION AND PUMPING STATIONS IN 10 THE AREA OF GREEN VIEW WEST, INCLUDING 11 WALNUT STREET, OAK STREET, WILLIAMS 12 STREET, AND PRINCE STREET; MACKIE LANE, 13 VINE LANE, LAUREL LANE, CHESTER LANE 14 AND BICHLER LANE; RINALDI DRIVE, 15 BARBARA DRIVE; DONNY DRIVE AND ANTHONY 16 DRIVE 2,400,000 17 (BASE PROJECT ALLOCATION - $2,000,000) 18 (DESIGN AND CONTINGENCIES - $400,000) 19 (W) COMPLETION OF THE LACKAWANNA RIVER <-- 20 RESTORATION PROJECT IN OLYPHANT 21 BOROUGH 500,000 22 (v) (IX) Luzerne County <-- 23 (A) Township of Plains, Mill Creek Flood 24 Protection Project, construction of a 25 flood protection project along Mill 26 Creek and its unnamed tributary 1,030,000 27 (vi) (X) Montgomery County <-- 28 (A) Upper Dublin Township - Construction 29 and rehabilitation of Ardsley Drainage 30 Channel 1,800,000 19970S0188B1351 - 141 -
1 (XI) NORTHUMBERLAND COUNTY <-- 2 (A) MOUNT CARMEL BOROUGH, SHAMOKIN CREEK 3 DRAINAGE FACILITY 4,000,000 4 (B) MOUNT CARMEL BOROUGH, BUTTERNUT CREEK 5 DRAINAGE FACILITY 1,000,000 6 (vii) (XII) Schuylkill County <-- 7 (A) Flood control project on Wabash Creek, 8 Walker Township and Tamaqua Borough, 9 involving a tunnel bypass of collapsed 10 culvert 12,100,000 11 (Base Project Allocation - $11,000,000) 12 (Design and Contingencies - $1,100,000) 13 (viii) (XIII) Somerset County <-- 14 (A) Summit Township, construction of a 15 concrete flood wall on the Summit 16 Township side of the Casselman River 17 across the river from the Borough of 18 Meyersdale 5,000,000 19 (XIV) WESTMORELAND COUNTY <-- 20 (A) REHABILITATION OF GATES AND PASSIVE 21 CONSTRUCTION OF CREEK CHANNEL FOR 22 KEYSTONE COMMONS FLOOD CONTROL PROJECT 1,250,000 23 (ix) (XV) York County <-- 24 (A) Construction of flood retention 25 basins, Dallastown Borough and York 26 Township 350,000 27 (B) Construction of flood retention 28 basins, Powder Mill and Tyler Run 29 Roads 505,000 30 (XVI) CARBON COUNTY <-- 19970S0188B1351 - 142 -
1 (A) ADDITIONAL FUNDS FOR THE CHANNEL 2 EXCAVATION AND REMOVAL OF OBSTRUCTIONS 3 ON AQUASHICOLA CREEK, PALMERTON 4 BOROUGH 138,000 5 (XVII) SULLIVAN COUNTY 6 (A) FLOOD CONTROL PROJECT TO PREVENT 7 RUNOFF FROM LOYALSOCK CREEK, DUSHORE 8 BOROUGH 235,000 9 (2) DEPARTMENT OF TRANSPORTATION $500,000 10 (I) LACKAWANNA COUNTY 11 (A) CITY OF SCRANTON, 1300 BLOCK OF 12 WYOMING AVENUE FLOOD CONTROL AND STORM 13 WATER PROJECT, INCLUDING, BUT NOT 14 LIMITED TO, STORM SEWERS AND ROAD 15 RECONSTRUCTION AND PUMPING STATIONS 500,000 16 (BASE PROJECT ALLOCATION - $420,000) 17 (DESIGN AND CONTINGENCIES - $80,000) 18 Section 8. Itemization of Keystone Recreation, Park and 19 Conservation Projects. 20 Projects in the category of Keystone Recreation, Park and 21 Conservation projects to be constructed by the Department of 22 Conservation and Natural Resources, its successors or assigns, 23 and to be financed by the incurring of debt and/or current 24 revenues, are hereby itemized, together with their respective 25 estimated costs, as follows: 26 Total 27 Project 28 Project Allocation 29 (1) Department of Conservation and Natural <-- 30 Resources $15,150,000 19970S0188B1351 - 143 -
1 (1) DEPARTMENT OF CONSERVATION AND NATURAL <-- 2 RESOURCES $34,542,000 3 (1) DEPARTMENT OF CONSERVATION AND NATURAL <-- 4 RESOURCES $39,822,000 5 (1) DEPARTMENT OF CONSERVATION AND NATURAL <-- 6 RESOURCES $40,322,000 7 (i) Bald Eagle State Park 8 (A) Renovation of the sewage treatment 9 plant and collection system 600,000 10 (ii) Forest District 12 11 (A) Rehabilitate 30 miles of Pine Creek 12 Trail 1,250,000 13 (B) Rehabilitate Colton Point Road 1,200,000 <-- 14 (III) FOREST DISTRICT 16 <-- 15 (A) REHABILITATE COLTON POINT ROAD 1,200,000 16 (iii) (IV) Gifford Pinchot State Park <-- 17 (A) Renovation of the sewage treatment 18 plant and collection system 800,000 19 (B) Rehabilitation of comfort stations, 20 children's play areas, parking and 21 access areas 750,000 22 (Base Project Allocation - $750,000) 23 (iv) (V) Kings Gap Environmental Education <-- 24 Center 25 (A) Replacement of interior plumbing and 26 upgrade electrical and heating systems 700,000 27 (v) (VI) Ryerson Station State Park <-- 28 (A) Rehabilitate swimming pool 700,000 29 (vi) (VII) Worlds End State Park <-- 30 (A) Construct new sewage treatment plant 19970S0188B1351 - 144 -
1 and collection system 500,000 2 (vii) (VIII) Lackawanna State Park <-- 3 (A) Park improvements 225,000 4 (viii) Thornhurst State Park <-- 5 (IX) THORNHURST STATE PICNIC AREA <-- 6 (A) Park improvements 150,000 7 (ix) (X) Ricketts Glen State Park <-- 8 (A) Construction of new park office and 9 demolition and clearance of existing 10 site 750,000 11 (Base Project Allocation - $750,000) 12 (XI) PRESQUE ISLE STATE PARK <-- 13 (A) OFFICE REHABILITATION AND EXPANSION 850,000 14 (x) (XII) Allegheny County <-- 15 (A) Dormont Borough, Beggs Snyder Park 16 Improvements 50,000 17 (XIII) BEAVER COUNTY <-- 18 (A) CONSTRUCTION OF BRIDGEWATER - 19 ROCHESTER PEDESTRIAN LINK 50,000 20 (B) COMPLETION OF DESIGN AND ENGINEERING 21 FOR BOROUGH OF BEAVER RIVERFRONT 22 ACCESS, PARK AND MARINA 40,000 23 (C) CONSTRUCTION OF BEAVER - BRIDGEWATER 24 PEDESTRIAN LINK 25,000 25 (D) REHABILITATION OF ROCHESTER DOCK AND 26 BOAT ACCESS 200,000 27 (E) RIVERFRONT PROPERTY ACQUISITIONS 2,000,000 28 (F) INTERPRETIVE RIVER TRAIL SYSTEM 250,000 29 (G) BRIDGEWATER BICENTENNIAL PARK 30 EXTENSION AND BANK STABILIZATION 50,000 19970S0188B1351 - 145 -
1 (xi) (XIV) Bucks County <-- 2 (A) Acquisition of 167 acres designated as 3 a working "historic airfield" 1,500,000 4 (xii) (XV) Butler County <-- 5 (A) Alameda Park, renovation of pool 600,000 6 (B) CITY OF BUTLER, POOL RENOVATIONS 185,000 <-- 7 (C) BUTLER TOWNSHIP, REPLACEMENT OF 8 RECREATION CENTER BUILDING AND 9 CONSTRUCTION OF FOUR PAVILIONS AT 10 TOWNSHIP PARK 430,000 11 (D) BUTLER COUNTY PARKS AND RECREATION 12 COMMISSION, RENOVATION OF ALAMEDA POOL 175,000 13 (E) BUTLER COMMUNITY COLLEGE, RENOVATION 14 OF EXISTING BASEBALL FIELD, 15 CONSTRUCTION OF NEW BALL FIELD AND 16 JOGGING TRAIL AND RENOVATION OF TWO 17 TENNIS COURTS 290,000 18 (XVI) CAMBRIA COUNTY 19 (A) REHABILITATION OF HIGHLAND REGIONAL 20 PARK/HIGHLAND FIELD 51,000 21 (XVII) CUMBERLAND COUNTY 22 (A) SHIPPENSBURG TOWNSHIP, PARK AND SPORTS 23 FACILITIES INCLUDING BASEBALL AND 24 SOCCER FIELDS, SKATING FACILITIES, 25 PAVILION AND PICNIC FACILITY, JOGGING 26 AND BIKING TRAILS AND PARKING 27 FACILITIES 275,000 28 (XVIII) ELK COUNTY 29 (A) ELK HABITAT EDUCATION LOCATED IN 30 BENEZETTE TOWNSHIP 1,000,000 19970S0188B1351 - 146 -
1 (XIX) FAYETTE COUNTY
2 (A) RAIL BED ACQUISITION FOR A SHEEPKIN
3 TRAIL COUNCIL BICYCLE TRAIL 120,000
4 (XX) GREENE COUNTY
5 (A) MONONGAHELA RIVER TRAIL LAND
6 ACQUISITION AND DEVELOPMENT ALONG STEEL
7 HERITAGE ROUTE 2,000,000
8 (xiii) (XXI) Lackawanna County <--
9 (A) Borough of Moosic, park and
10 playground 200,000
11 (B) Borough of Moscow, park and
12 playground 100,000
13 (C) Greenfield Township, park and
14 playground 50,000
15 (D) Newton Township, baseball park at
16 three sites 500,000
17 (E) Newton Township, park and playground 50,000
18 (F) South Abington Township, park and
19 playground 200,000
20 (G) CITY OF SCRANTON, TRIPP PARK CIVIC <--
21 ASSOCIATION COMMUNITY CENTER,
22 INCLUDING, BUT NOT LIMITED TO,
23 BUILDING, EQUIPMENT AND LANDSCAPING 25,000
24 (H) CITY OF SCRANTON, CONSTRUCTION OF
25 FIELD HOUSE AT TONY BARLETTA FIELD 36,000
26 (BASE PROJECT ALLOCATION - $30,000)
27 (DESIGN AND CONTINGENCIES - $6,000)
28 (I) CITY OF SCRANTON, PURCHASE OF
29 BLEACHERS, PLAYERS' BENCHES, FIELD
30 MAINTENANCE EQUIPMENT AND OPEN AIR
19970S0188B1351 - 147 -
1 PAVILION AT TONY BARLETTA FIELD 18,000 2 (J) CITY OF SCRANTON, PURCHASE OF 3 BLEACHERS, PLAYERS' BENCHES AND FIELD 4 MAINTENANCE EQUIPMENT TO BE USED AT 5 RECREATIONAL FACILITIES LOCATED IN THE 6 CITY OF SCRANTON 25,000 7 (K) CITY OF SCRANTON, CONSTRUCTION OF 8 GRANDSTAND, REHABILITATION OF DUGOUTS 9 AND FENCE REPLACEMENT AT FREDDY 10 BATTAGLIA FIELD 20,000 11 (L) CITY OF SCRANTON, REHABILITATION OF 12 NAY AUG PARK, INCLUDING, BUT NOT 13 LIMITED TO, BUILDINGS, PAVILIONS, ROAD 14 RESURFACING, PARKING FACILITIES, 15 REHABILITATION OF SWIMMING FACILITIES 16 AND REHABILITATION OF EVERHART MUSEUM 3,600,000 17 (BASE PROJECT ALLOCATION - $3,000,000) 18 (DESIGN AND CONTINGENCIES - $600,000) 19 (M) CITY OF SCRANTON, REHABILITATION OF 20 EXISTING SWIMMING POOLS, INCLUDING, BUT 21 NOT LIMITED TO, BATHHOUSE FACILITIES 22 AND FILTER ROOMS 1,200,000 23 (BASE PROJECT ALLOCATION - $1,000,000) 24 (DESIGN AND CONTINGENCIES - $200,000) 25 (N) BOROUGH OF THROOP, BALLPARK AND 26 RECREATION SITE 30,000 27 (BASE PROJECT ALLOCATION - $25,000) 28 (DESIGN AND CONTINGENCIES - $5,000) 29 (O) CITY OF SCRANTON, NAY AUG GORGE ACCESS 30 AND SAFETY IMPROVEMENTS 350,000 19970S0188B1351 - 148 -
1 (P) BOROUGH OF CLARKS SUMMIT, RENOVATION
2 OF PROPERTY AND PURCHASE OF EQUIPMENT FOR
3 PLANNED RECREATION AREA 100,000
4 (Q) ARTIFICIAL TURF REPLACEMENT AT <--
5 LACKAWANNA COUNTY MULTIPURPOSE STADIUM 1,680,000
6 (BASE PROJECT ALLOCATION - $1,400,000)
7 (DESIGN AND CONTINGENCIES - $280,000)
8 (R) CITY OF SCRANTON, RENOVATION OF WESTON
9 PARK COMPLEX, INCLUDING, BUT NOT
10 LIMITED TO, MAIN BUILDING, SWIMMING
11 POOL, LOCKER ROOMS, BASKETBALL COURTS,
12 TENNIS COURTS, PARKING AREA AND ROADWAY
13 AND FOOTBALL FIELDS 1,200,000
14 (BASE PROJECT ALLOCATION - $1,000,000)
15 (DESIGN AND CONTINGENCIES - $200,000)
16 (S) CITY OF SCRANTON, RENOVATION OF WESTON
17 FIELD COMPLEX, INCLUDING, BUT NOT
18 LIMITED TO, MAIN BUILDING; INDOOR
19 SWIMMING POOL; BASKETBALL COURT; MEN'S
20 AND WOMEN'S LOCKER ROOMS; OUTDOOR
21 BASKETBALL COURTS; TENNIS COURTS;
22 HANDBALL COURT; PAVILION; SWIMMING
23 POOL, INCLUDING LOCKER ROOMS; PARKING
24 AREA; ROADWAYS; PLAYGROUND AND
25 BASKETBALL FIELD 2,400,000
26 (BASE PROJECT ALLOCATION - $2,000,000)
27 (DESIGN AND CONTINGENCIES - $400,000)
28 (xiv) (XXII) Lehigh County <--
29 (A) City of Allentown, renovations to
30 Bicentennial Park 750,000
19970S0188B1351 - 149 -
1 (xv) (XXIII) Luzerne County <-- 2 (A) Susquehanna River Trail, construction 3 of trail along a corridor of railway 4 owned by the Luzerne County Rail 5 Corporation from Borough of Duryea to 6 City of Wilkes-Barre 300,000 7 (xvi) (XXIV) Northampton County <-- 8 (A) City of Bethlehem, nonstructural 9 renovation of downtown pedestrian 10 plaza/park area 750,000 11 (XXV) PHILADELPHIA COUNTY <-- 12 (A) RENOVATION OF MORRIS PARK 667,000 13 (B) RENOVATION OF HADDINGTON RECREATION 14 CENTER 667,000 15 (C) RENOVATION OF TUSTIN RECREATION 16 CENTER 667,000 17 (D) TENROSE PLAYGROUND, IMPROVEMENTS TO 18 BUILDING 500,000 19 (XXVI) WARREN COUNTY <-- 20 (A) DEVELOPMENT OF THE RIVERFRONT IN 21 WARREN COUNTY 500,000 22 (XXVI) (XXVII) WASHINGTON COUNTY <-- 23 (A) RENOVATION OF MAIN PAVILION FOR 24 GREATER WASHINGTON PARK COMMISSION 100,000 25 (B) CANONSBURG PARK BOARD 246,000 26 (xvii) (XXVII) (XXVIII) York County <-- 27 (A) Heritage Rail/Trail, development of 28 ten miles of trail and associated 29 improvements 1,625,000 30 (xviii) Presque Isle State Park <-- 19970S0188B1351 - 150 -
1 (A) Office rehabilitation and expansion 850,000 2 (XXVIII) (XXIX) RACCOON CREEK STATE PARK <-- 3 (A) REHABILITATION OF GROUP CAMP NO. 2-3 2,000,000 4 (B) RENOVATION OF MAIN PICNIC AREA, VALLEY 5 PICNIC AREA AND ROAD SYSTEM 2,000,000 6 (2) DEPARTMENT OF COMMUNITY AND ECONOMIC 7 DEVELOPMENT $38,000 8 (I) SHAWNEE PARK FIELD, CITY OF MONESSEN, 9 WESTMORELAND COUNTY 10 (A) ERECTION OF LIGHTS 38,000 11 (BASE PROJECT ALLOCATION - $30,000) 12 (DESIGN AND CONTINGENCIES - $8,000) 13 Section 9. Itemization of Pennsylvania Game Commission Capital 14 Projects. 15 The individual capital projects in the category of public 16 improvement projects to be acquired by the Pennsylvania Game 17 Commission and to be financed from current revenues of the Game 18 Fund pursuant to executive authorizations are hereby itemized, 19 together with their respective estimated costs, as follows: 20 Total 21 Project 22 Project Allocation 23 (1) Pennsylvania Game Commission $5,000,000 24 (i) Upgrade FM radio system for all western 25 regions including construction of towers, 26 shelters and antennae and the acquisition 27 of microwave equipment, base stations, 28 consoles and other equipment necessary to 29 achieve a communication system fully 30 compatible with future 800 MHz Statewide 19970S0188B1351 - 151 -
1 system 5,000,000 2 Section 10. Itemization of Pennsylvania Fish and Boat 3 Commission Capital Projects. 4 (A) PROJECTS TO BE FINANCED FROM CURRENT REVENUES.--The <-- 5 individual capital projects in the category of public 6 improvement projects to be developed by the Pennsylvania Fish 7 and Boat Commission and to be financed from current revenues of 8 the Fish Fund and the Boat Fund pursuant to executive 9 authorizations are hereby itemized, together with their 10 respective estimated costs, as follows: 11 Total 12 Project 13 Project Allocation 14 (1) Pennsylvania Fish and Boat Commission $6,380,000 <-- 15 (1) PENNSYLVANIA FISH AND BOAT COMMISSION $10,080,000 <-- 16 (1) PENNSYLVANIA FISH AND BOAT COMMISSION $11,520,000 <-- 17 (i) Beaver County 18 (A) Development of a boating access area 19 in Monaca Borough 200,000 20 (Base Project Allocation - $200,000) 21 (ii) Crawford County 22 (A) Acquisition and renovation of a 23 Northeast Law Enforcement Office and 24 associated regional Fish and Boat 25 Commission office facilities and 26 installation of boat storage, parking 27 and associated facilities in Vernon 28 Township 180,000 29 (Base Project Allocation - $180,000) 30 (iii) Erie County 19970S0188B1351 - 152 -
1 (A) Shades Beach Park Development 6,000,000
2 (IV) LACKAWANNA COUNTY <--
3 (A) DEVELOPMENT OF PARKING AREA AND
4 BOATING AND FISHING ACCESS AREA FOR
5 PERSONS WHO ARE PHYSICALLY DISABLED AT
6 MERLI/SARNOSKI PARK 720,000
7 (BASE PROJECT ALLOCATION - $600,000)
8 (DESIGN AND CONTINGENCIES - $120,000)
9 (B) DEVELOPMENT OF PARKING AREA, PAVILION
10 AND BOATING AND FISHING ACCESS AREA FOR
11 PERSONS WHO ARE PHYSICALLY DISABLED IN
12 THE BULLSHEAD SECTION OF SCRANTON ALONG
13 THE LACKAWANNA RIVER 720,000
14 (BASE PROJECT ALLOCATION - $600,000)
15 (DESIGN AND CONTINGENCIES - $120,000)
16 (IV) (V) WESTMORELAND COUNTY <--
17 (A) CONSTRUCTION OF A BOAT ACCESS AT THE
18 MONESSEN RIVERFRONT IN THE CITY OF
19 MONESSEN 200,000
20 (B) SUPPLEMENTAL AUTHORIZATION.--THE AMOUNTS AUTHORIZED FOR
21 EXPENDITURE FROM THE FISH FUND AND THE BOAT FUND UNDER SECTIONS
22 9, 10 AND 11 OF THE ACT OF DECEMBER 28, 1992 (P.L.1694, NO.188),
23 KNOWN AS THE CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 1991-
24 1992, ARE SUPPLEMENTED AS FOLLOWS:
25 TOTAL
26 PROJECT
27 PROJECT ALLOCATION
28 (1) DAUPHIN COUNTY
29 (I) ADMINISTRATIVE HEADQUARTERS
30 (A) ACQUISITION OR CONSTRUCTION OF
19970S0188B1351 - 153 -
1 ADMINISTRATIVE AND RELATED FACILITIES, 2 INCLUDING ADMINISTRATIVE HEADQUARTERS, 3 AQUATIC RESOURCE EDUCATION CENTER, 4 WAREHOUSE, TRAINING AND RELATED 5 FACILITIES ON COMMISSION-OWNED 6 PROPERTY 3,000,000 7 (FISH FUND - $2,250,000) 8 (BOAT FUND - $750,000) 9 (BASE CONSTRUCTION AUTHORIZATION 10 SUPPLEMENT - $2,500,000) 11 (DESIGN AND CONTINGENCIES SUPPLEMENT - 12 $500,000) 13 (B) ORIGINAL FURNITURE AND EQUIPMENT 500,000 14 (FISH FUND - $375,000) 15 (BOAT FUND - $125,000) 16 (C) IN ADDITION TO THE METHODS BY WHICH 17 THE PENNSYLVANIA FISH AND BOAT 18 COMMISSION WAS AUTHORIZED TO CONSTRUCT 19 THE FACILITY DESCRIBED IN THIS 20 SUBSECTION UNDER SECTION 11 OF THE ACT 21 OF DECEMBER 28, 1992 (P.L.1694, 22 NO.188), KNOWN AS THE CAPITAL BUDGET 23 PROJECT ITEMIZATION ACT OF 1991-1992, 24 THE COMMISSION IS HEREBY AUTHORIZED TO 25 FUND ALL OR PART OF THE PUBLIC 26 IMPROVEMENT PROJECT DESCRIBED IN THIS 27 SUBSECTION WITH FUNDS AUTHORIZED UNDER 28 SECTIONS 14, 15, 16 AND 17 OF THIS ACT, 29 PROVIDED THAT THE COMMISSION RECEIVES 30 EXECUTIVE APPROVAL AND AUTHORIZATION TO 19970S0188B1351 - 154 -
1 EXPEND SUCH FUNDS AND FURTHER PROVIDED
2 THAT THE FISH FUND AND BOAT FUND SHALL
3 REPAY THE PRINCIPAL AND INTEREST OF THE
4 FUNDS EXPENDED HEREUNDER.
5 Section 11. Restriction on certain funds.
6 The new and additional funds provided for DGS 948-37, the
7 expansion of central air conditioning system to the Main Capitol
8 Building, DGS 948-35, the fire safety code improvements to the
9 Capitol Complex specifically relating to the Capitol Building
10 and the repair and renovation of the Capitol Complex, itemized
11 in section 3(7)(i)(B), (C) and (E), shall only be disbursed upon
12 the written approval of both the Chief Clerk of the Senate and
13 the Chief Clerk of the House of Representatives. The new and
14 additional funds provided for DGS 948-35, the fire safety code
15 improvements relating to the North Office Building shall only be
16 disbursed upon the written approval of the Chief Clerk of the
17 Senate. The new and additional funds provided for DGS 948-35,
18 the fire safety code improvements relating to the South Office
19 Building and DGS 946-2, renovation and conversion of the Old
20 Museum Building for legislative offices shall only be disbursed
21 upon the written approval of the Chief Clerk of the House of
22 Representatives.
23 Section 12. Limited waiver of local requirements.
24 (a) Waivers for current itemizations.--The limitation on
25 Department of Transportation funding of capital projects under
26 74 Pa.C.S. § 1302(4) (relating to program authorizations) shall
27 be totally waived for the capital projects in the category of
28 transportation assistance projects for mass transit contained in
29 section 5(a)(9)(iii), (vii) and (viii), (10)(i), 5(A)(15)(V), <--
30 (VI), (VII), (XIV), (XV) AND (XVII), (16)(I) (ii), (iii),
19970S0188B1351 - 155 -
1 (xiii), (xiv) and (xv) and (14)(i) (21)(I). <-- 2 (b) Waiver for 1992 itemization.-- 3 (1) Notwithstanding any provision to the contrary, there 4 shall be no local match funding requirement for phases I and 5 II of the National magnetic levitation prototype proposal and 6 development, as described in section 5(b)(15)(i)(B) of the 7 act of December 28, 1992 (P.L.1694, No.188), known as the 8 Capital Budget Project Itemization Act of 1991-1992. 9 (2) The Department of Transportation shall select a 10 contractor for the project described in section 11 5(b)(15)(i)(B) of the Capital Budget Project Itemization Act 12 of 1991-1992. Such selection shall be based on the following 13 criteria; the contractor must have extensive knowledge of 14 magnetic levitation technology and have been incorporated in 15 this Commonwealth for at least six years for the express 16 purpose of developing magnetic levitation technology. The 17 contractor must also have demonstrated an ability to attract 18 multimodal private sector investment, including corporate and 19 labor support, with participation of a major U.S. passenger 20 airline company. The contractor must also have demonstrated 21 an ability to obtain Federal, State and local funding for 22 magnetic levitation development. 23 Section 13. Use of existing funds. <-- 24 (a) Public improvements.--Of the $1,773,210,000 which is 25 authorized for the acquisition or construction of public 26 improvement projects under section 3, the sum of $25,540,000 27 shall be provided from excess funds available in the unallocated 28 reserves of the Capital Facilities Fund from previous public 29 improvement appropriations for projects for additional funding 30 itemized in section 3. 19970S0188B1351 - 156 -
1 (b) Furniture and equipment.--Of the $52,677,000 which is 2 authorized for the purchase of original movable furniture and 3 equipment for the projects which are included in section 4, the 4 sum of $115,000 shall be provided from excess funds available in 5 the unallocated reserves of the Capital Facilities Fund from 6 previous furniture and equipment appropriations for projects for 7 additional funding itemized in section 4. 8 SECTION 13. (RESERVED) <-- 9 SECTION 13. SPECIAL PROVISIONS. <-- 10 (A) DELEGATION AND EXEMPTION.--NOTWITHSTANDING ANY 11 PROVISIONS OF LAW TO THE CONTRARY, THE DEPARTMENT OF GENERAL 12 SERVICES MAY DELEGATE THE DESIGN AND CONSTRUCTION OF THE PROJECT 13 CONTAINED IN SECTION 3(2)(I)(A) TO THE ENTITY WITH WHICH A LEASE 14 HAS BEEN NEGOTIATED FOR THE OPERATION OF THE FACILITY TO BE 15 CONVERTED. IN ADDITION, THE PROJECT CONTAINED IN SECTION 16 3(2)(I)(A) IS EXEMPT FROM THE PROVISIONS OF THE FIRST PARAGRAPH 17 OF SECTION 1 OF THE ACT OF MAY 1, 1913 (P.L.155, NO.104), 18 ENTITLED "AN ACT REGULATING THE LETTING OF CERTAIN CONTRACTS FOR 19 THE ERECTION, CONSTRUCTION, AND ALTERATION OF PUBLIC BUILDINGS," 20 AND ANY PROVISIONS OF LAW REQUIRING THE BIDDING OF PROJECTS. 21 (B) LEASE OF PROJECT.--THE DEPARTMENT OF GENERAL SERVICES IS 22 AUTHORIZED TO ENTER INTO A LEASE ARRANGEMENT, WHICH IS OF AT 23 LEAST 20 YEARS' DURATION AND WHICH MAY CONTAIN OPTIONS TO RENEW 24 THE LEASE, WITH AN ENTITY FOR THE OPERATION AND MAINTENANCE OF 25 THE PROJECT AUTHORIZED IN SECTION 3(2)(I)(A). 26 Section 14. Debt authorization. 27 (a) Public improvements.--The Governor, Auditor General and 28 State Treasurer are hereby authorized and directed to borrow 29 from time to time in addition to any authorization heretofore or 30 hereafter enacted, on the credit of the Commonwealth, subject to 19970S0188B1351 - 157 -
1 the limitations provided in the current capital budget, money 2 not exceeding in the aggregate the sum of $1,747,670,000 <-- 3 $2,139,205,000 $2,358,345,000 $2,378,345,000 as may be found <-- 4 necessary to carry out the acquisition and construction of the 5 public improvement projects specifically itemized in a capital 6 budget. 7 (b) Furniture and equipment.--The Governor, Auditor General 8 and State Treasurer are hereby authorized and directed to borrow 9 from time to time in addition to any authorization heretofore or 10 hereafter enacted, on the credit of the Commonwealth, subject to 11 the limitations provided in the current capital budget, money 12 not exceeding in the aggregate the sum of $52,562,000 <-- 13 $56,390,000 $54,390,000 as may be found necessary to carry out <-- 14 the public improvement projects consisting of the acquisition of 15 original movable furniture and equipment specifically itemized 16 in a capital budget. 17 (c) Transportation assistance.--The Governor, Auditor 18 General and State Treasurer are hereby authorized and directed 19 to borrow from time to time in addition to any authorization 20 heretofore or hereafter enacted, on the credit of the 21 Commonwealth, subject to the limitations provided in the current 22 capital budget, money not exceeding in the aggregate the sum of 23 $540,881,000 $942,866,000 $952,633,000 $958,633,000 as may be <-- 24 found necessary to carry out the acquisition and construction of 25 the transportation assistance projects specifically itemized in 26 a capital budget. 27 (d) Redevelopment assistance.--Subject to the limitation in 28 section 1616.1-B(b) of the act of April 9, 1929 (P.L.343, 29 No.176), known as The Fiscal Code, the Governor, Auditor General 30 and State Treasurer are hereby authorized and directed to borrow 19970S0188B1351 - 158 -
1 from time to time in addition to any authorization heretofore or 2 hereafter enacted, on the credit of the Commonwealth, subject to 3 the limitations provided in the current capital budget, money 4 not exceeding in the aggregate the sum of $1,012,098,000 <-- 5 $2,414,531,000 $2,526,774,000 $2,527,774,000 as may be found <-- 6 necessary to carry out the redevelopment assistance and the 7 redevelopment capital assistance projects specifically itemized 8 in a capital budget. 9 (e) Flood control.--The Governor, Auditor General and State 10 Treasurer are hereby authorized and directed to borrow from time 11 to time in addition to any authorization heretofore or hereafter 12 enacted, on the credit of the Commonwealth, subject to the 13 limitations provided in the current capital budget, money not 14 exceeding in the aggregate the sum of $25,456,000 $122,241,000 <-- 15 $122,741,000 as may be found necessary to carry out the <-- 16 acquisition and construction of the flood control projects 17 specifically itemized in a capital budget. 18 Section 15. Issue of bonds. 19 The indebtedness authorized in this act shall be incurred, 20 from time to time, and shall be evidenced by one or more series 21 of general obligation bonds of the Commonwealth in such 22 aggregate principal amount for each series as the Governor, the 23 Auditor General and the State Treasurer shall determine, but the 24 latest stated maturity date shall not exceed the estimated 25 useful life of the projects being financed as stated in section 26 16. 27 Section 16. Estimated useful life and term of debt. 28 (a) Estimated useful life.--The General Assembly states that 29 the estimated useful life of the public improvement projects 30 itemized in this act is as follows: 19970S0188B1351 - 159 -
1 (1) Public improvement projects, 30 years. 2 (2) Furniture and equipment projects, 10 years. 3 (3) Transportation assistance projects: 4 (i) Rolling stock, 15 years. 5 (ii) Passenger buses, 12 years. 6 (iii) Furniture and equipment, 10 years. 7 (iv) All others, 30 years. 8 (b) Term of debt.--The maximum term of the debt authorized 9 to be incurred under this act is 30 years. 10 Section 17. Appropriations. 11 (a) Public improvements.--The net proceeds of the sale of 12 the obligations authorized in this act are hereby appropriated 13 from the Capital Facilities Fund to the Department of General 14 Services in the maximum amount of $1,747,670,000 $2,139,205,000 <-- 15 $2,358,345,000 $2,378,345,000 to be used by it exclusively to <-- 16 defray the financial cost of the public improvement projects 17 specifically itemized in a capital budget. After reserving or 18 paying the expenses of the sale of the obligation, the State 19 Treasurer shall pay to the Department of General Services the 20 moneys as required and certified by it to be legally due and 21 payable. 22 (b) Furniture and equipment.--The net proceeds of the sale 23 of the obligations authorized in this act are hereby 24 appropriated from the Capital Facilities Fund to the Department 25 of General Services in the maximum amount of $52,562,000 <-- 26 $56,390,000 $54,390,000 to be used by it exclusively to defray <-- 27 the financial cost of the public improvement projects consisting 28 of the acquisition of original movable furniture and equipment 29 specifically itemized in a capital budget. After reserving or 30 paying the expenses of the sale of the obligation, the State 19970S0188B1351 - 160 -
1 Treasurer shall pay to the Department of General Services the 2 moneys as required and certified by it to be legally due and 3 payable. 4 (c) Transportation assistance.--The net proceeds of the sale 5 of the obligations authorized in this act are hereby 6 appropriated from the Capital Facilities Fund to the Department 7 of Transportation in the maximum amount of $540,881,000 <-- 8 $942,866,000 $952,633,000 $958,633,000 to be used by it <-- 9 exclusively to defray the financial cost of the transportation 10 assistance projects specifically itemized in a capital budget. 11 After reserving or paying the expense of the sale of the 12 obligation, the State Treasurer shall pay to the Department of 13 Transportation the moneys as required and certified by it to be 14 legally due and payable. 15 (d) Redevelopment assistance.--The net proceeds of the sale 16 of the obligations authorized in this act are hereby 17 appropriated from the Capital Facilities Fund to the Department 18 of Community and Economic Development in the maximum amount of 19 $1,012,098,000 $2,414,531,000 $2,526,744,000 $2,527,774,000 to <-- 20 be used by it exclusively to defray the financial cost of the 21 redevelopment assistance and redevelopment capital assistance 22 projects specifically itemized in a capital budget. After 23 reserving or paying the expenses of the sale of the obligation, 24 the State Treasurer shall pay to the Department of Community and 25 Economic Development the moneys as required and certified by it 26 to be legally due and payable. 27 (e) Flood control.--The net proceeds of the sale of the 28 obligations authorized in this act are hereby appropriated from 29 the Capital Facilities Fund to the Department of Environmental 30 Protection in the maximum amount of $25,456,000 $122,241,000 <-- 19970S0188B1351 - 161 -
1 $122,741,000 to be used by it exclusively to defray the <-- 2 financial cost of the flood control projects specifically 3 itemized in a capital budget. After reserving or paying the 4 expense of the sale of the obligation, the State Treasurer shall 5 pay to the Department of Environmental Protection the moneys as 6 required and certified by it to be legally due and payable. 7 Section 18. Federal funds. 8 In addition to those funds appropriated in section 17, all <-- 9 moneys received from the Federal Government for the projects 10 specifically itemized in this act are also hereby appropriated 11 for those projects. 12 (A) PROJECTS ITEMIZED IN THIS ACT.--IN ADDITION TO THOSE <-- 13 FUNDS APPROPRIATED IN SECTION 17, ALL MONEYS RECEIVED FROM THE 14 FEDERAL GOVERNMENT FOR THE PROJECTS SPECIFICALLY ITEMIZED IN 15 THIS ACT ARE ALSO HEREBY APPROPRIATED FOR THOSE PROJECTS. 16 (B) PROJECTS NOT REQUIRING ITEMIZATION.--DEPARTMENT OF 17 MILITARY AND VETERANS AFFAIRS CONSTRUCTION PROJECTS WHICH ARE 18 TOTALLY FEDERALLY FUNDED BUT WHICH ARE TO BE ADMINISTERED BY THE 19 DEPARTMENT OF GENERAL SERVICES ARE HEREBY AUTHORIZED. 20 (C) PROJECTS TO BE COMPLETED WITH FEDERAL FUNDS ONLY.-- 21 FEDERAL FUNDS IN THE AMOUNT OF $14,501,000 ARE AUTHORIZED FOR 22 THE CONSTRUCTION OF A BARRACKS COMPLEX IN LEBANON COUNTY FOR THE 23 DEPARTMENT OF MILITARY AND VETERANS AFFAIRS. FEDERAL FUNDS IN 24 THE AMOUNT OF $3,516,000 ARE AUTHORIZED FOR THE CONSTRUCTION OF 25 A REGIONAL MAINTENANCE FACILITY IN SCRANTON, LACKAWANNA COUNTY 26 FOR THE DEPARTMENT OF MILITARY AND VETERANS AFFAIRS. 27 Section 19. Prioritization of public improvement projects. 28 The public improvement projects authorized in this act shall 29 be prioritized by the Department of General Services in such 30 manner as to ensure that at least 25% of the total financial 19970S0188B1351 - 162 -
1 cost of public improvement projects approved for design and/or 2 construction in any one fiscal year shall be for new 3 construction projects and at least 25% of the total financial 4 cost of public improvement projects approved for design and/or 5 construction in any one fiscal year shall be for the major 6 renovation and retrofit of existing facilities. 7 Section 20. Expiration of authorization and appropriation. 8 The authorization and appropriation for the additional 9 capital projects itemized in sections 3, 4, 5, 6, 7, 8, 9 and 10 10 for which construction contracts have not been executed within 11 four years of the effective date of this act shall expire upon 12 such date and shall be considered repealed. The Secretary of the 13 Budget may extend an expired project for up to one year upon 14 written notification of the majority chairman and minority 15 chairman of the Appropriations Committee of the Senate and the 16 majority chairman and minority chairman of the Appropriations 17 Committee of the House of Representatives. Upon expiration of 18 the extension period, an extended project may not be 19 subsequently extended. 20 Section 21. Special contract provisions. 21 Notwithstanding any provisions of law to the contrary, the 22 Department of General Services may, to facilitate project 23 management, conflict resolution and timely project completion 24 contract for construction management services for the 25 construction of a 500-cell maximum security juvenile detention 26 facility to be located in Western Pennsylvania, to be known as 27 the State Correction Facility at Indiana for Juvenile Offenders, 28 for the construction of the 1,000-cell medium security facility 29 in Forest County, and for the construction of a 1,236-cell 30 close-security facility in Western Pennsylvania. 19970S0188B1351 - 163 -
1 Section 22. Coordination. 2 The program provided for in section 3(14)(iv)(A) and (B) 3 shall be developed in conjunction with the project referenced in 4 section 5(b)(15)(i)(B) of the act of December 28, 1992 5 (P.L.1694, No.188), known as the Capital Budget Project 6 Itemization Act of 1991-1992, subject to the conditions set 7 forth in the act of July 2, 1993 (P.L.134, No.31), known as the 8 Capital Budget Act of 1993-1994. 9 SECTION 23. DELEGATION AND EXEMPTION OF PUBLIC IMPROVEMENT <-- 10 PROJECTS. 11 FOR THE PUBLIC IMPROVEMENT PROJECTS SPECIFICALLY ITEMIZED IN 12 SECTION 3(14)(XIII) 3(14)(XVIII) and section 3(9)(ii) of the act <-- 13 of June 2, 1993 (P.L.265, No.47), known as the Capital Budget 14 Project Itemization Act of 1993-1994, the Department of General 15 Services shall, within 60 days of the effective date of this 16 act, delegate the authority to construct, improve, equip, 17 furnish, maintain, acquire or operate such projects to the 18 Philadelphia Regional Port Authority. Notwithstanding any 19 provision of law to the contrary, the Philadelphia Regional Port 20 Authority, at its discretion and subsequent to the 21 aforementioned delegation, may contract with one or more of the 22 tenant companies leasing or operating port facilities at the 23 Port of Philadelphia for the purpose of constructing, improving, 24 equipping, furnishing, maintaining, acquiring or operating the 25 public improvement projects specifically itemized in section 26 3(14)(xiii) 3(14)(XVIII) and section 3(9)(ii) of the Capital <-- 27 Budget Project Itemization Act of 1993-1994. In addition, the 28 projects contained in section 3(14)(xiii) 3(14)(XVIII) and <-- 29 section 3(9)(ii) of the Capital Budget Project Itemization Act 30 for 1993-1994 shall be exempt from the first paragraph of 19970S0188B1351 - 164 -
1 section 1 of the act of May 1, 1913 (P.L.155, No.104), entitled 2 "An act regulating the letting of certain contracts for the 3 erection, construction, and alteration of public buildings," the 4 provisions of the act of March 3, 1978 (P.L.6, No.3), known as 5 the Steel Products Procurement Act, and any provisions of law 6 requiring the bidding of projects. 7 Section 23 24. Repeals. <-- 8 The following acts and parts of acts are repealed: 9 Section 3(1)(i)(A) and (12)(ii)(A) of the act of July 10, 10 1986 (P.L.1285, No.118), known as the Capital Budget Project 11 Itemization Act for 1984-1985. 12 Section 3(3)(v)(A)(vi) AND (5)(CLIX)(B) AND (C) of the act of <-- 13 October 21, 1988 (P.L.851, No.113), known as the Capital Budget 14 Project Itemization Act for 1987-1988. 15 Sections 3(4)(ii)(A)(II) and 6(1)(iii)(A) of the act of 16 December 28, 1992 (P.L.1694, No.188), known as the Capital 17 Budget Project Itemization Act of 1991-1992. 18 Sections 3(4)(i)(A) and (ii)(E) and (6)(v)(A) and 7(1)(ii)(A) <-- 19 and (iv)(A) of the act of July 8, 1994 (P.L.444, No.74), known 20 as the Capital Budget Project Itemization Act for 1994-1995. 21 Sections 3(7)(vi)(a) and 5(19)(i)(A) of the act of July 2, 22 1993 (P.L.265, No.47), known as the Capital Budget Project 23 Itemization Act for 1993-1994. 24 Section 6(3)(ii)(A) SECTIONS 3(4)(I)(A) AND (II)(E) AND <-- 25 (6)(V)(A), 6(3)(II)(A) AND 7(1)(II)(A), (IV)(A) AND (X)(A) of 26 the act of July 8, 1994 (P.L.444, No.74), known as the Capital 27 Budget Project Itemization Act for 1994-1995. 28 Section 68(k)(1) of the act of December 12, 1994 (P.L.962, 29 No.136), known as the First Supplemental Capital Budget Project 30 Itemization Act of 1994-1995. 19970S0188B1351 - 165 -
1 Section 24 25. Editorial changes. <-- 2 In editing and preparing this act for printing following the 3 final enactment, the Legislative Reference Bureau shall insert 4 or revise letters or numbers for projects where the letters or 5 numbers are missing or require revision. The bureau shall also 6 revise the total monetary amounts for the total authorization, 7 debt authorization, appropriations and departmental totals as 8 necessary to agree with the total monetary amounts of the 9 projects. 10 Section 25 26. Effective date. <-- 11 This act shall take effect immediately. A16L86RZ/19970S0188B1351 - 166 -