     1  To the act of July 11, 1996 (P.L.595, No.101), entitled "An act
     2     providing for the capital budget for the fiscal year 1996-
     3     1997," itemizing public improvement projects, furniture and
     4     equipment projects, transportation assistance projects,
     5     redevelopment assistance and redevelopment assistance capital
     6     projects, flood control projects, Keystone Recreation, Park
     7     and Conservation projects and forestry bridge projects to be
     8     constructed or acquired or assisted by the Department of
     9     General Services, the Department of Conservation and Natural
    10     Resources, the Department of Environmental Protection, the
    11     Department of Community and Economic Development, the
    12     Department of Transportation, the Pennsylvania Fish and Boat
    13     Commission or the Pennsylvania Game Commission, together with
    14     their estimated financial costs; authorizing the incurring of
    15     debt without the approval of the electors for the purpose of
    16     financing the projects to be constructed or acquired or
    17     assisted by the Department of General Services, the
    18     Department of Conservation and Natural Resources, the
    19     Department of Environmental Protection, the Department of
    20     Community and Economic Development or the Department of
    21     Transportation; stating the estimated useful life of the
    22     projects; authorizing certain waivers; making appropriations;
    23     and making repeals.

    24     The General Assembly of the Commonwealth of Pennsylvania
    25  hereby enacts as follows:
    26  Section 1.  Short title.
    27     This act shall be known and may be cited as the Capital

     1  Budget Project Itemization Act for 1996-1997.
     2  Section 2.  Total authorizations.
     3     (a)  Public improvements.--The total authorization for the
     4  additional capital projects in the category of public
     5  improvement projects itemized in section 3 and to be acquired or
     6  constructed by the Department of General Services, its
     7  successors or assigns, and to be financed by the incurring of
     8  debt, shall be $1,773,210,000 $2,139,205,000.                     <--
     9     (b)  Furniture and equipment.--The total authorization for
    10  the additional capital projects in the category of public
    11  improvement projects consisting of the acquisition of original
    12  movable furniture and equipment to complete public improvement
    13  projects itemized in section 4 and to be acquired by the
    14  Department of General Services, its successors or assigns, and
    15  to be financed by the incurring of debt, shall be $52,677,000     <--
    16  $56,390,000.
    17     (c)  Transportation assistance.--The total authorization for
    18  the capital projects in the category of transportation
    19  assistance projects itemized in section 5 with respect to which
    20  an interest is to be acquired in or constructed by the
    21  Department of Transportation, its successors or assigns, and to
    22  be financed by the incurring of debt, shall be $540,881,000       <--
    23  $942,866,000.
    24     (d)  Redevelopment assistance.--The total authorization for
    25  the additional capital projects in the category of redevelopment
    26  assistance and redevelopment assistance capital projects
    27  itemized in section 6 for capital grants by the Department of
    28  Community and Economic Development, its successors or assigns,
    29  and to be financed by the incurring of debt, shall be
    30  $1,012,098,000 $2,414,531,000.                                    <--
    19970S0188B1336                  - 2 -

     1     (e)  Flood control.--The total authorization for the capital
     2  projects in the category of flood control projects itemized in
     3  section 7 and to be constructed by the Department of
     4  Environmental Protection, its successors or assigns, and to be
     5  financed by the incurring of debt, shall be $25,456,000           <--
     6  $122,241,000.
     7     (f)  Keystone Recreation, Park and Conservation.--The total
     8  authorization for the capital projects in the category of
     9  Keystone Recreation, Park and Conservation projects itemized in
    10  section 8 and to be constructed by the Department of
    11  Conservation and Natural Resources, its successors or assigns,
    12  and to be financed from revenues in the Keystone Recreation,
    13  Park and Conservation Fund shall be $15,150,000 $34,580,000.      <--
    14     (g)  Game Fund projects.--The total authorization for the
    15  capital projects in the category of public improvement projects
    16  itemized in section 9 to be acquired by the Pennsylvania Game
    17  Commission and to be financed from current revenues of the Game
    18  Fund pursuant to executive authorizations shall be $5,000,000.
    19     (h)  Fish and Boat Fund projects.--The total authorization
    20  for the capital projects in the category of public improvement
    21  projects itemized in section 10 to be acquired or developed by
    22  the Pennsylvania Fish and Boat Commission and to be financed
    23  from current revenues of the Boat Fund and the Fish Fund
    24  pursuant to executive authorization shall be $6,380,000           <--
    25  $10,080,000.
    26  Section 3.  Itemization of public improvement projects.
    27     Additional capital projects in the category of public
    28  improvement projects to be constructed or acquired by the
    29  Department of General Services, its successors or assigns, and
    30  to be financed by the incurring of debt, are hereby itemized,
    19970S0188B1336                  - 3 -

     1  together with their respective estimated financial costs, as
     2  follows:
     3                                                           Total
     4                                                          Project
     5             Project                                    Allocation
     6  (1)  Department of Agriculture                       $12,397,000
     7     (i)  Department of Agriculture Headquarters
     8         (A)  Construction of a headhouse and
     9             greenhouse addition including a covered
    10             walkway to connect all structures             392,000
    11             (Base Project Allocation - $327,000)
    12             (Design and Contingencies - $65,000)
    13     (ii)  Farm Show Complex
    14         (A)  Removal of piping and ducting which
    15             contain asbestos materials and/or
    16             encapsulation of asbestos containing
    17             materials in Large Arena                      785,000
    18             (Base Project Allocation - $654,000)
    19             (Design and Contingencies - $131,000)
    20         (B)  Reconstruction of roof system
    21             including supporting joists, framing,
    22             decking, asbestos abatement and
    23             exterior materials involving 455,000
    24             square feet over all main exhibition
    25             areas. Project must be fully evaluated
    26             regarding feasibility and costs of
    27             alternatives to reconstructing the
    28             existing design before implementation       9,000,000
    29             (Base Project Allocation - $7,500,000)
    30             (Design and Contingencies - $1,500,000)
    19970S0188B1336                  - 4 -

     1         (C)  Conversion of one existing boiler to a
     2             gas/oil fired unit to allow flexible
     3             operations at lower pressures                 420,000
     4             (Base Project Allocation - $350,000)
     5             (Design and Contingencies - $70,000)
     6         (D)  Exterior cleaning, sealing and
     7             reconstruction of masonry walls and
     8             decorative friezes of main building         1,800,000
     9             (Base Project Allocation - $1,500,000)
    10             (Design and Contingencies - $300,000)
    11  (2)  Department of Community and Economic                         <--
    12     Development                                      $150,500,000
    13  (2)  DEPARTMENT OF COMMUNITY AND ECONOMIC                         <--
    14     DEVELOPMENT                                       $16,549,000
    15     (i)  Port of Philadelphia
    16         (A)  Construction of a cruise ship
    17             facility                                    2,000,000
    18     (ii)  David L. Lawrence Convention Center                      <--
    19         (A)  Expansion of convention center           145,000,000
    20     (iii)  Pittsburgh's north shore
    21         (A)  Construction of a passenger pier
    22             terminal                                    1,000,000
    23     (II)  PORT OF PITTSBURGH                                       <--
    24         (A)  CONSTRUCTION OF A PASSENGER PIER
    25             TERMINAL ON PITTSBURGH'S NORTH SHORE        1,000,000
    26     (III)  PORT OF ERIE
    27         (A)  STATE STREET PIER CONSTRUCTION AND
    28             RENOVATION                                  1,000,000
    29     (IV)  LACKAWANNA COUNTY
    30         (A)  BOROUGH OF THROOP, PURCHASE AND
    19970S0188B1336                  - 5 -

     1             INSTALLATION OF TRAFFIC CONTROL DEVICES
     2             ON UNDERWOOD ROAD                              11,000
     3             (BASE PROJECT ALLOCATION - $9,000)
     4             (DESIGN AND CONTINGENCIES - $2,000)
     5     (V)  GREENE COUNTY
     6         (A)  NEMACOLIN INDUSTRIAL PARK - PHASE I
     7             SITE DEVELOPMENT, ENVIRONMENTAL
     8             ASSESSMENT AND CLEAN-UP AND
     9             IMPROVEMENTS TO PORT FACILITIES            10,000,000
    10     (iv) (VI)  Somerset County, Summit Township                    <--
    11         (A)  Relocation of approximately 46 houses
    12             out of the flood plain of the Casselman
    13             River across the river from the Borough
    14             of Meyersdale                               2,500,000
    15     (VII)  SHAWNEE PARK FIELD, CITY OF MONESSEN,                   <--
    16         WESTMORELAND COUNTY
    17         (A)  ERECTION OF LIGHTS                            38,000
    18             (BASE PROJECT ALLOCATION - $30,000)
    19             (DESIGN AND CONTINGENCIES - $8,000)
    20  (3)  Department of Conservation and Natural                       <--
    21     Resources                                         $25,568,000
    22  (3)  DEPARTMENT OF CONSERVATION AND NATURAL                       <--
    23     RESOURCES                                         $81,175,000
    24     (I)  CHAPMAN DAM STATE PARK
    25         (A)  FLOOD DAMAGE REPAIRS, RENOVATIONS AND
    26             PROVIDE INCREASED HANDICAPPED
    27             ACCESSIBILITY                                 550,000
    28     (i) (II)  Cowans Gap State Park                                <--
    29         (A)  Day-use upgrade                              300,000
    30         (B)  Repair dam control tower and gate
    19970S0188B1336                  - 6 -

     1             valve                                         700,000
     2         (C)  Sewage treatment plant upgrade               200,000
     3     (III)  LACKAWANNA STATE PARK                                   <--
     4         (A)  CONSTRUCTION OF IMPROVEMENTS AND
     5             ADDITIONAL AMENITIES                          200,000
     6     (IV)  LEHIGH GORGE STATE PARK
     7         (A)  PARK IMPROVEMENTS                          2,925,000
     8             (BASE PROJECT ALLOCATION - $2,500,000)
     9             (DESIGN AND CONTINGENCIES - $425,000)
    10         (B)  INTERPRETIVE FACILITIES AND TRAIL
    11             CONSTRUCTION                                3,225,000
    12             (BASE PROJECT ALLOCATION - $2,750,000)
    13             (DESIGN AND CONTINGENCIES - $475,000)
    14         (C)  LAND ACQUISITION                           2,500,000
    15     (ii) (V)  Nescopeck State Park                                 <--
    16         (A)  Park development, construction of
    17             comfort stations, pavilions, warming
    18             huts, roadways, parking lots and
    19             utilities in the main, middle and lower
    20             day use areas                               2,000,000
    21         (B)  Development of cabin area,
    22             construction of ten rustic cabins,
    23             including roads, utilities and site
    24             development                                 1,500,000
    25         (C)  Development of overnight camping area,
    26             construction of campground to include
    27             site development, bath houses, living
    28             areas, roads, overflow parking and
    29             utilities                                   1,500,000
    30     (iii) (VI)  Oil Creek State Park                               <--
    19970S0188B1336                  - 7 -

     1         (A)  Rehabilitation and enlargement of
     2             train station                                 100,000
     3         (B)  Design, production and installation of
     4             exhibits                                      201,000
     5     (iv) (VII)  Presque Isle State Park                            <--
     6         (A)  Waterworks reservoir area - Phase II         950,000
     7         (B)  Rehabilitation of park roadways            1,760,000
     8         (C)  Rehabilitation of water mains serving
     9             park                                        2,610,000
    10         (D)  State share of the cost of
    11             replenishing the sand on the lake side
    12             shore                                         650,000
    13             (Base Project Allocation - $650,000)
    14         (E)  Beach nourishment and breakwater
    15             maintenance                                 5,800,000
    16         (F)  Rehabilitation of comfort facilities
    17             and sewage system                           1,800,000
    18         (G)  Rehabilitation of Presque Isle Marina        962,000
    19     (v) (VIII)  Prince Gallitzen State Park                        <--
    20         (A)  Additional funds for DGS 195-37,
    21             rehabilitate marina, Phase III,
    22             construct bulkhead to protect area from
    23             erosion                                     1,500,000
    24             (Base Project Allocation - $1,250,000)
    25             (Design and Contingencies - $250,000)
    26     (IX)  PYMATUNING STATE PARK                                    <--
    27         (A)  LINESVILLE SPILLWAY IMPROVEMENTS           2,407,000
    28             (BASE PROJECT ALLOCATION - $2,012,000)
    29             (DESIGN AND CONTINGENCIES - $395,000)
    30     (X)  RACCOON CREEK STATE PARK
    19970S0188B1336                  - 8 -

     1         (A)  RENOVATION OF CABINS, AMPHITHEATER AND
     2             BATHROOMS                                   1,500,000
     3             (BASE PROJECT ALLOCATION - $1,250,000)
     4             (DESIGN AND CONTINGENCIES - $250,000)
     5         (B)  RENOVATION OF WATER AND SEWAGE
     6             SYSTEMS                                     2,000,000
     7             (BASE PROJECT ALLOCATION - $1,666,000)
     8             (DESIGN AND CONTINGENCIES - $334,000)
     9         (C)  DEVELOPMENT OF NEW PICNIC AND LAUNCH
    10             AREA ON ROUTE 18                            1,000,000
    11         (D)  CAMPGROUND, MAIN PICNIC AREA, PAVILION
    12             BUILDINGS AND OTHER STRUCTURES,
    13             ELECTRICITY PROJECT                           800,000
    14     (vi) (XI)  Shawnee State Park                                  <--
    15         (A)  Additional funds for DGS 155-11,
    16             replacement of two bridges on main park
    17             road                                          900,000
    18         (B)  Replace lift station                          80,000
    19         (C)  Construct rental cabins and support
    20             facilities                                  1,500,000
    21         (D)  Rehabilitate water plant roof and
    22             filters                                       140,000
    23     (XII)  SWATARA STATE PARK                                      <--
    24         (A)  RAUSCH CREEK ACID MINE DRAINAGE
    25             TREATMENT PLANT, ADDITIONAL TREATMENT
    26             UNITS AND CHEMICAL FEEDING EQUIPMENT TO
    27             ACCOMMODATE INCREASED WATER FLOW DUE TO
    28             THE DIVERSION OF WATER FROM THE SWATARA
    29             CREEK TO THE RAUSCH CREEK                   4,500,000
    30             (BASE PROJECT ALLOCATION - $3,800,000)
    19970S0188B1336                  - 9 -

     1             (DESIGN AND CONTINGENCIES - $700,000)
     2     (vii) (XIII)  Tyler State Park                                 <--
     3         (A)  Rehabilitation of Schofield/Ford
     4             Covered Bridge                                250,000
     5     (XIV)  MEADOWCROFT ROCK SHELTER, AVELLA                        <--
     6         (A)  RENOVATION OF VISITORS' ACCESS AND
     7             EXHIBIT DEVELOPMENT                         2,000,000
     8             (BASE PROJECT ALLOCATION - $1,750,000)
     9             (DESIGN AND CONTINGENCIES - $250,000)
    10     (XV)  ALLEGHENY, WESTMORELAND, FAYETTE AND
    11         SOMERSET COUNTIES
    12         (A)  ACQUISITION AND DEVELOPMENT OF THE
    13             PITTSBURGH TO WASHINGTON, D.C., TRAIL      10,000,000
    14     (XVI)  BLAIR COUNTY
    15         (A)  ACQUISITION AND DEVELOPMENT AS A TRAIL
    16             THE NEW PORTAGE RAILROAD AND
    17             HOLLIDAYSBURG & PETERSBURG BRANCH OF
    18             THE FORMER PENNSYLVANIA RAILROAD FROM
    19             WILLIAMSBURG TO GALLITZIN, CAMBRIA
    20             COUNTY                                      9,000,000
    21     (XVII)  SOMERSET COUNTY
    22         (A)  REHABILITATION OF THE BIG SAVAGE
    23             TUNNEL AND RELATED STRUCTURES               6,000,000
    24     (viii) (XVIII)  Borough of Ashley                              <--
    25         (A)  Chester area of Solomon's Creek and
    26             Bobby Strish Park Association,
    27             enhancement to the trout fishing and
    28             picnic areas along Solomon's Creek,
    29             rehabilitation and/or construction of a
    30             baseball and softball field, concession
    19970S0188B1336                 - 10 -

     1             stands, restroom facilities and parking
     2             lot                                           165,000
     3     (XIX)  HARBORCREEK TOWNSHIP, ERIE COUNTY                       <--
     4         (A)  SHADES BEACH PARK DEVELOPMENT              6,000,000
     5     (XX)  GULICH TOWNSHIP, CLEARFIELD COUNTY
     6         (A)  FACILITIES IMPROVEMENTS AT MOUNTY
     7             MEMORIAL PARK                               1,000,000
     8  (4)  Department of Corrections                      $247,844,000  <--
     9  (4)  DEPARTMENT OF CORRECTIONS                      $251,850,000  <--
    10     (i)  State Correctional Institution - Coal
    11         Township, Northumberland County
    12         (A)  Addition of three modular units for
    13             inmate housing                             27,600,000
    14             (Base Project Allocation - $23,000,000)
    15             (Design and Contingencies - $4,600,000)
    16     (ii)  State Correctional Institution - Dallas
    17         (A)  Reconstruction of three boilers,
    18             installation of new controls,
    19             reconstruction of support structures
    20             and associated fuel handling equipment      5,640,000
    21             (Base Project Allocation - $4,700,000)
    22             (Design and Contingencies - $940,000)
    23     (iii)  State Correctional Institution -
    24         Graterford
    25         (A)  Construction of a Level 2 housing
    26             unit, including dormitories, 50 double
    27             rooms, offices, sanitary facilities,
    28             multi-purpose room, laundry and storage
    29             areas                                       5,340,000
    30             (Base Project Allocation - $4,450,000)
    19970S0188B1336                 - 11 -

     1             (Design and Contingencies - $890,000)
     2         (B)  Upgrade perimeter security including
     3             additional lighting for both sides of
     4             perimeter wall, electrified fence
     5             inside perimeter and electronic
     6             monitoring at three sally ports             5,456,000
     7             (Base Project Allocation - $4,547,000)
     8             (Design and Contingencies - $909,000)
     9     (iv)  State Correctional Institution -
    10         Greensburg
    11         (A)  Upgrade electric utility system            2,400,000
    12             (Base Project Allocation - $2,000,000)
    13             (Design and Contingencies - $400,000)
    14     (v)  State Correctional Institution - Mercer
    15         (A)  Expansion of kitchen/dining,
    16             administration and program facilities
    17             along with utilities including water,
    18             sewer and electric                          6,000,000
    19             (Base Project Allocation - $5,000,000)
    20             (Design and Contingencies - $1,000,000)
    21         (B)  Construction of a Level 2 housing
    22             unit, including dormitories, 50 double
    23             rooms, offices, sanitary facilities,
    24             multi-purpose room, laundry and storage
    25             areas                                       5,340,000
    26             (Base Project Allocation - $4,450,000)
    27             (Design and Contingencies - $890,000)
    28     (vi)  State Correctional Institution - Muncy
    29         (A)  Addition of two new cell blocks for
    30             close security, expansion of infirmary,
    19970S0188B1336                 - 12 -

     1             outside warehouse, electrical and
     2             boiler upgrades                            26,364,000
     3             (Base Project Allocation - $21,970,000)
     4             (Design and Contingencies - $4,394,000)
     5     (vii)  State Correctional Institution -
     6         Pittsburgh
     7         (A)  Rehabilitation of boiler plant
     8             components including combustion control
     9             system, stokers on boilers 4 and 5,
    10             emergency generator, ash removal system
    11             and building components                     3,120,000
    12             (Base Project Allocation - $2,600,000)
    13             (Design and Contingencies - $520,000)
    14     (viii)  State Correctional Institution -
    15         Rockview
    16         (A)  Construction of a Level 2 housing
    17             unit, including dormitories, 50 double
    18             rooms, offices, sanitary facilities,
    19             multi-purpose room, and laundry and
    20             storage areas. Also renovations to the
    21             kitchen and dining rooms and
    22             improvements to the perimeter security
    23             and intrusion detection system              8,994,000  <--
    24             (Base Project Allocation - $7,495,000)
    25             (Design and Contingencies - $1,499,000)
    26             AND INTRUSION DETECTION SYSTEM             13,000,000  <--
    27             (BASE PROJECT ALLOCATION - $10,800,000)
    28             (DESIGN AND CONTINGENCIES - $2,200,000)
    29     (ix)  State Correctional Institution - Western
    30         Pennsylvania
    19970S0188B1336                 - 13 -

     1         (A)  Additional funds for DGS 575-3, to
     2             provide for expansion to 750 beds          16,110,000
     3             (Base Project Allocation - $13,425,000)
     4             (Design and Contingencies - $2,685,000)
     5     (x)  New State Correctional Institution -
     6         Western Pennsylvania ALLEGHENY COUNTY                      <--
     7         (A)  Construction of a new close-security
     8             institution in western portion of the                  <--
     9             State ALLEGHENY COUNTY with capacity of                <--
    10             approximately 1,236 cells. Includes
    11             construction of all other facilities as
    12             necessary to operate institution          135,480,000
    13             (Base Project Allocation -
    14             $105,984,000)
    15             (Land Allocation - $3,000,000)
    16             (Design and Contingencies -
    17             $26,496,000)
    18  (5)  Department of Education                        $391,022,000  <--
    19  (5)  DEPARTMENT OF EDUCATION                        $444,472,000  <--
    20     (i)  The Pennsylvania State University
    21         (A)  University Park Campus
    22             (I)  Classroom building - Phase II         12,100,000
    23             (II)  Renovation of Willard Building       10,300,000
    24             (III)  Renovation of Moore and Sparks
    25                 Buildings                              16,070,000
    26             (IV)  Library Depository Facility          11,000,000
    27             (V)  Renovation of Engineering Units
    28                 and Sackett Building                    8,600,000
    29             (VI)  Renovation of Chandlee
    30                 Laboratory                             10,200,000
    19970S0188B1336                 - 14 -

     1             (VII)  Renovation of Whitmore and Davey
     2                 Laboratories                           10,200,000
     3             (VIII)  BORLAND LABORATORY ADDITION,                   <--
     4                 RENOVATIONS                            12,000,000
     5             (IX)  CONSTRUCTION OF NEW FORESTRY
     6                 BUILDING                                9,000,000
     7             (X)  CONSTRUCTION OF A VISITORS CENTER      2,000,000
     8             (BASE PROJECT ALLOCATION - $1,500,000)
     9             (DESIGN AND CONTINGENCIES - $500,000)
    10             (XI)  CAPITAL RENEWAL FOR BUILDINGS AND
    11                 BUILDING SYSTEMS; UNIVERSITY PARK      20,000,000
    12         (B)  Altoona Campus
    13             (I)  Construct Multistory Classroom
    14                 Facility                                7,000,000  <--
    15                 FACILITY                                8,000,000  <--
    16             (II)  CONSTRUCTION OF NEW MULTIPURPOSE
    17                 ACTIVITY BUILDING                       4,750,000
    18         (C)  Capital HARRISBURG Campus                             <--
    19             (I)  Construct academic activities
    20                 building                                3,750,000
    21         (D)  DuBois Campus
    22             (I)  Addition to and renovation of
    23                 Smeal Building                          1,700,000
    24         (E)  Great Valley Center
    25             (I)  Addition to building                   8,000,000
    26         (F)  Mont Alto
    27             (I)  Renovation of General Studies
    28                 Building                                3,200,000
    29         (G)  MCKEESPORT CAMPUS                                     <--
    30             (I)  DESIGN AND CONSTRUCT STUDENT
    19970S0188B1336                 - 15 -

     1                 UNION/MULTIPURPOSE BUILDING             1,400,000
     2         (G) (H)  York Campus                                       <--
     3             (I)  Construct library addition and
     4                 classroom building addition            11,900,000
     5         (H) (I)  The Behrend College                               <--
     6             (I)  Construction of a research and
     7                 development center                     30,000,000
     8             (II)  Renovation of Otto Behrend
     9                 Building                                3,100,000
    10             (III)  Restoration of Erie Hall             1,800,000
    11             (IV)  Maintenance of Police and Safety
    12                 Building                                1,800,000
    13     (ii)  University of Pittsburgh
    14         (A)  Oakland Campus
    15             (I)  Upgrade and deferred maintenance
    16                 for buildings and building systems
    17                 Phase I                                12,000,000
    18             (II)  Upgrade and deferred maintenance
    19                 for buildings and building systems
    20                 Phase II                               12,000,000
    21             (III)  Additional funds for DGS 1103-
    22                 48, Convocation/Events Center          25,000,000
    23             (IV)  Renovation of Trees Hall and
    24                 Fitzgerald Field House Phase I         11,300,000
    25             (V)  Renovation of the Cathedral of
    26                 Learning                               20,000,000
    27             (VI)  Additional Funds for Hillman
    28                 Library Renovation Phase II             9,600,000
    29             (VII)  Acquisition of Bellefield Tower
    30                 for WPIC Children and Family
    19970S0188B1336                 - 16 -

     1                 Programming                             8,000,000
     2             (VIII)  Construction of Basic Sciences
     3                 Complex                                25,000,000
     4         (B)  Bradford Campus
     5             (I)  Communications, Art and Technology
     6                 Building                               15,800,000
     7         (C)  Johnstown Campus
     8             (I)  Additional funds for DGS 1103-53,
     9                 classroom/administration building         532,000
    10             (II)  Additional funds for Library
    11                 renovations                             1,580,000
    12     (iii)  Temple University
    13         (A)  Main Campus
    14             (I)  Installation of an Electronic
    15                 access/intrusion detection system
    16                 at main campus                          8,411,000
    17             (Base Project Allocation - $7,009,000)
    18             (Design and Contingencies - $1,402,000)
    19             (II)  Rehabilitation of lecture halls:
    20                 Barton, Beury, Speakman, Ritter         4,900,000
    21             (III)  Roofing replacement and repairs:
    22                 Presser, Gladfelter, Anderson
    23                 Classroom, Anderson Engineering and
    24                 Architecture, Paley, Bio-Life,
    25                 Physical Plant, Computer,
    26                 Tomlinson, Weiss, Sullivan,
    27                 Conwell, Thomas, Student Activities
    28                 Center, Tyler Hall, Mitten,
    29                 Speakman, 1900 Block Park Mall,
    30                 Bright Hall, Dixon and Widener          4,410,000
    19970S0188B1336                 - 17 -

     1             (IV)  Tomlinson Theater rehabilitation
     2                 and addition                            5,049,000
     3             (V)  Mitten Hall renovation for
     4                 performance hall                        8,820,000
     5             (VI)  Rehabilitation of building system
     6                 components:  Curtis, Barton, Eeury,
     7                 Biolife Sciences                       15,000,000
     8             (VII)  College Hall Renovations - Phase
     9                 II                                        850,000
    10             (VIII)  Additional funds for DGS 1104-
    11                 57, emergency fire and safety
    12                 renovations, Phase II, to address
    13                 complexities revealed by initial
    14                 surveys within buildings on main
    15                 campus to enable university to
    16                 comply with fire codes                  2,900,000
    17                 (Base Project Allocation -
    18                 $2,417,000)
    19                 (Design and Contingencies -
    20                 $483,000)
    21             (IX)  Additional funds for DGS 1104-53,
    22                 Classroom and Laboratory Building       3,000,000
    23         (B)  Ambler Campus
    24             (I)  Education/learning technology
    25                 center                                  7,200,000
    26         (C)  Various Campuses
    27             (I)  Masonry, sidewalk and walkway
    28                 repairs: Paley, Thomas, Ritter,
    29                 Ritter Annex, Computer, Sullivan,
    30                 Klein, Curtis Speakman, Bio-Life,
    19970S0188B1336                 - 18 -

     1                 Barton, Beury, Pearson/McGonigle,
     2                 Mitten, Johnson/Hardwick, Peabody,
     3                 FSUB, Old Dental, Engineering and
     4                 Architecture, Student Activities
     5                 Center, Kresge, Tyler, Dixon,
     6                 Widener, Park Mall, Berks Mall          7,812,000
     7             (II)  Telecommunications infrastructure
     8                 improvements                            8,100,000
     9             (III)  Deferred maintenance and energy
    10                 conservation: Bio-Life, Beury,
    11                 Tomlinson, Medical Research,
    12                 Medical School                          4,474,000
    13             (IV)  Computing and data
    14                 communications                          6,907,000
    15         (D)  All Campuses
    16             (I)  Fluorescent lighting retrofit          3,749,000
    17     (iv)  Lincoln University
    18         (A)  Construction of storm water drainage
    19             system including piping and a detention
    20             basin to prevent hydraulic overload of
    21             the sewer system                            1,084,000
    22             (Base Project Allocation - $903,000)
    23             (Design and Contingencies - $181,000)
    24     (v)  Thaddeus Stevens State School of
    25         Technology
    26         (A)  Construction of a multi-purpose
    27             activities center and rehabilitation
    28             and renovation of the existing
    29             gymnasium for a trade-technical
    30             laboratory                                  5,000,000
    19970S0188B1336                 - 19 -

     1         (B)  Repair and rebuild underground utility
     2             tunnel system and repair masonry
     3             retaining wall adjacent to Stevens
     4             Avenue                                        350,000
     5         (C)  Upgrade of high voltage electrical
     6             distribution system                           180,000
     7             (Base Project Allocation - $150,000)
     8             (Design and Contingencies - $30,000)
     9         (D)  Reconstruct and separate storm water
    10             and sewer conduit systems                   1,080,000
    11             (Base Project Allocation - $900,000)
    12             (Design and Contingencies - $180,000)
    13     (vi)  Scranton State School for the Deaf
    14         (A)  Reconstruction of roof system on
    15             O'Donnell Building                            214,000
    16             (Base Project Allocation - $178,000)
    17             (Design and Contingencies - $36,000)
    18         (B)  CAMPUS SAFETY AND GROUNDS                             <--
    19             IMPROVEMENTS                                2,300,000
    20             (BASE PROJECT ALLOCATION - $1,920,000)
    21             (DESIGN AND CONTINGENCIES - $380,000)
    22     (VII)  READING AREA COMMUNITY COLLEGE
    23         (A)  NEW COMPUTERS FOR THE HISTORY AND
    24             POLITICAL SCIENCE DEPARTMENT                1,000,000
    25  (6)  Department of Environmental Protection          $28,147,000  <--
    26  (6)  DEPARTMENT OF ENVIRONMENTAL PROTECTION          $87,176,000  <--
    27     (i)  Allegheny County
    28         (A)  Greenwald Road Flood Control Project
    29             DGS 184-20                                  2,000,000
    30         (B)  Additional funds for DGS 184-20,
    19970S0188B1336                 - 20 -

     1             culverts and debris basin along
     2             tributary to Grassers Run, Bethel Park      1,080,000
     3             (Base Project Allocation - $900,000)
     4             (Design and Contingencies - $180,000
     5         (C)  Additional funds for DGS 184-18,
     6             construction of levee, floodplain
     7             excavation and concrete retaining wall
     8             along Pine Creek, Shaler Township             360,000
     9             (Base Project Allocation - $300,000)
    10             (Design and Contingencies - $60,000)
    11     (ii)  Armstrong County
    12         (A)  Reconstruction of valves and seals at
    13             the Ernest deep mine complex, Rayne
    14             Township                                      654,000
    15             (Base Project Allocation - $545,000)
    16             (Design and Contingencies - $109,000)
    17     (III)  BEAVER COUNTY                                           <--
    18         (A)  BEAVER RIVER SILT CONTROL AND
    19             PREVENTION PROGRAM                            500,000
    20     (iii) (IV)  Bedford County                                     <--
    21         (A)  Borough of Hyndman, flood protection
    22             project                                     3,000,000
    23             (Base Project Allocation - $2,500,000)
    24             (Design and Contingencies - $500,000)
    25     (iv) (V)  Berks County                                         <--
    26         (A)  Replacement of the Felix Dam
    27             Construction of a new reinforced
    28             concrete dam                                3,900,000
    29             (Base Construction Allocation -
    30             $3,300,000)
    19970S0188B1336                 - 21 -

     1             (Design and Contingencies - $600,000)
     2     (VI)  BLAIR COUNTY                                             <--
     3         (A)  MILL RUN CREEK FLOOD PROTECTION
     4             PROJECT, CITY OF ALTOONA, LOGAN AND
     5             ALLEGHENY TOWNSHIPS                         5,874,000
     6             (BASE PROJECT ALLOCATION - $5,574,000)
     7             (DESIGN AND CONTINGENCIES - $300,000)
     8     (v) (VII)  Bradford County                                     <--
     9         (A)  Rehabilitation of Sayre Flood Control
    10             Project by reconstructing interceptor
    11             drainage system beneath levee                 600,000
    12             (Base Project Allocation - $500,000)
    13             (Design and Contingencies - $100,000)
    14     (vi) (VIII)  Bucks County                                      <--
    15         (A)  Flood control and storm water
    16             management, Phase I affecting Bristol
    17             Borough and Bristol, Falls and
    18             Middletown Townships                          350,000
    19     (IX)  BUTLER COUNTY                                            <--
    20         (A)  CONTINUATION OF SULLIVAN RUN
    21             STREAMBANK STABILIZATION PROJECT IN
    22             CITY OF BUTLER                                500,000
    23         (B)  STORM WATER PROJECTS IN BUTLER
    24             TOWNSHIP                                      750,000
    25         (C)  ACQUISITION OF BUTLER CDC WATER SYSTEM
    26             AND CONSTRUCTION OF STORAGE TANK,
    27             PUMPING STATION AND INSTALLATION OF
    28             MAINS                                       3,975,000
    29     (X)  CAMBRIA COUNTY
    30         (A)  FLOOD CONTROL - SEPARATION OF COMBINED
    19970S0188B1336                 - 22 -

     1             SEWERS AND INTERCEPTOR CAPACITY
     2             IMPROVEMENTS IN CITY OF JOHNSTOWN           1,200,000
     3         (B)  WEST END FLOOD IMPROVEMENTS IN THE
     4             CITY OF JOHNSTOWN                           5,000,000
     5     (XI)  CLEARFIELD COUNTY
     6         (A)  MORRIS TOWNSHIP, IMPROVEMENTS TO WATER
     7             DISTRIBUTION SYSTEM NEAR WEST DECATUR         500,000
     8         (B)  BOGGS TOWNSHIP, IMPROVEMENTS TO WATER
     9             DISTRIBUTION SYSTEM NEAR SALEM AREA           500,000
    10         (C)  BOGGS TOWNSHIP, IMPROVEMENTS TO WATER
    11             DISTRIBUTION SYSTEM IN SPRING VALLEY-
    12             BIGLER AREA                                   500,000
    13         (D)  BRADFORD TOWNSHIP, IMPROVEMENTS TO
    14             WATER DISTRIBUTION SYSTEM NEAR BIGLER         500,000
    15         (E)  BRADFORD TOWNSHIP, IMPROVEMENTS TO
    16             WATER DISTRIBUTION SYSTEM NEAR
    17             MILLSTONE AREA                                500,000
    18         (F)  DECATUR TOWNSHIP, IMPROVEMENTS TO
    19             WATER DISTRIBUTION SYSTEM NEAR MOCK
    20             HILL                                          500,000
    21         (G)  DECATUR TOWNSHIP, IMPROVEMENTS TO
    22             WATER DISTRIBUTION SYSTEM NEAR PLEASANT
    23             HILL                                          500,000
    24         (H)  DECATUR TOWNSHIP, IMPROVEMENTS TO
    25             WATER DISTRIBUTION SYSTEM NEAR DRANE
    26             HILL                                          500,000
    27         (I)  WOODWARD TOWNSHIP, IMPROVEMENTS TO
    28             WATER DISTRIBUTION SYSTEM NEAR SANBOURN
    29             AREA                                          500,000
    30         (J)  GRAHAM TOWNSHIP, IMPROVEMENTS AND
    19970S0188B1336                 - 23 -

     1             EXTENSIONS TO WATER DISTRIBUTION
     2             SYSTEM                                      2,000,000
     3         (K)  PIKE TOWNSHIP, IMPROVEMENTS AND
     4             REHABILITATION OF SEWAGE TREATMENT
     5             FACILITIES                                  1,000,000
     6         (L)  OSCEOLA MILLS BOROUGH, FLOOD CONTROL
     7             PROJECT TO INCLUDE REPAIR OF THE
     8             CULVERT BOX FOR THE COMPLETE LENGTH OF
     9             THE CANAL                                   3,000,000
    10             (BASE PROJECT ALLOCATION - $2,500,000)
    11             (DESIGN AND CONTINGENCIES - $500,000)
    12     (vii) (XII)  Fayette County                                    <--
    13         (A)  Additional funds for DGS 180-23,
    14             construction of retaining walls and
    15             culverts and excavation to widen or
    16             deepen Dunbar Creek and Gist Run
    17             channel in Dunbar                             396,000
    18             (Base Project Allocation - $330,000)
    19             (Design and Contingencies - $66,000)
    20     (XIII)  LACKAWANNA COUNTY                                      <--
    21         (A)  FUNDS FOR DGS 184-22 PHASE II FLOOD
    22             CONTROL PROJECT ON MEADOWBROOK CREEK,
    23             CITY OF SCRANTON AND BOROUGH OF
    24             DUNMORE                                     6,200,000
    25             (BASE PROJECT ALLOCATION - $5,000,000)
    26             (DESIGN AND CONTINGENCIES - $1,200,000)
    27         (B)  FUNDS FOR DGS 184-22 FLOOD CONTROL
    28             PROJECT ON LEGGETTS CREEK, CITY OF
    29             SCRANTON                                    4,800,000
    30             (BASE PROJECT ALLOCATION - $4,000,000)
    19970S0188B1336                 - 24 -

     1             (DESIGN AND CONTINGENCIES - $800,000)
     2         (C)  FUNDS FOR DGS 184-22 FLOOD CONTROL
     3             PROJECT ON KEYSER CREEK, CITY OF
     4             SCRANTON                                    4,800,000
     5             (BASE PROJECT ALLOCATION - $4,000,000)
     6             (DESIGN AND CONTINGENCIES - $800,000)
     7         (D)  FUNDS FOR DGS 184-22 FLOOD CONTROL
     8             PROJECT ON LUCKY-RUN CREEK, CITY OF
     9             SCRANTON                                    2,400,000
    10             (BASE PROJECT ALLOCATION - $2,000,000)
    11             (DESIGN AND CONTINGENCIES - $400,000)
    12         (E)  FUNDS FOR DGS 184-22 FLOOD CONTROL
    13             PROJECT ON LEACH CREEK, CITY OF
    14             SCRANTON                                    2,400,000
    15             (BASE PROJECT ALLOCATION - $2,000,000)
    16             (DESIGN AND CONTINGENCIES - $400,000)
    17     (viii) (XIV)  Lebanon County                                   <--
    18         (A)  Additional funds for Project DGS 182-
    19             12 located on Hazel Dyke Flood Control
    20             Project                                       480,000
    21             (Base Project Allocation - $400,000)
    22             (Design and Contingencies - $80,000)
    23     (ix) (XV)  Luzerne County                                      <--
    24         (A)  Construction of compact earth levee in
    25             area of Fox Hill in Plains Township
    26             including grass covered channel               240,000
    27             (Base Project Allocation - $200,000)
    28             (Design and Contingencies - $40,000)
    29     (x) (XVI)  Montgomery County                                   <--
    30         (A)  Additional funds for DGS 181-7,
    19970S0188B1336                 - 25 -

     1             Plymouth Creek improvement, Borough of
     2             Conshohocken                                  240,000
     3             (Base Project Allocation - $200,000)
     4             (Design and Contingencies - $40,000)
     5         (B)  SANDY RUN DRAINAGE SHED FLOOD CONTROL                 <--
     6             IMPROVEMENTS                                6,000,000
     7     (xi) (XVII)  Northumberland County                             <--
     8         (A)  Bank stabilization and reconstruction
     9             for Sunbury Flood Project                   1,440,000
    10             (Base Project Allocation - $1,200,000)
    11             (Design and Contingencies - $240,000)
    12     (xii) (XVIII)  Tioga County                                    <--
    13         (A)  Borough of Knoxville, flood protection
    14             project                                     5,100,000
    15             (Base Project Allocation - $4,250,000)
    16             (Design and Contingencies - $850,000)
    17     (XIX)  WARREN COUNTY                                           <--
    18         (A)  VARIOUS FLOOD PROTECTION PROJECTS          2,500,000
    19     (XX)  WESTMORELAND COUNTY
    20         (A)  REHABILITATION OF THE GREATER
    21             GREENSBURG AREA FLOOD PROTECTION
    22             PROJECT, SOUTH GREENSBURG BOROUGH AND
    23             HEMPFIELD TOWNSHIP                          1,620,000
    24             (BASE PROJECT ALLOCATION - $1,350,000)
    25             (DESIGN AND CONTINGENCIES - $270,000)
    26     (xiii) (XXI)  York County                                      <--
    27         (A)  City of York, Spring Garden Township
    28             and York Township, Tyler Run Flood
    29             Control Project                             2,500,000
    30         (B)  Spring Garden Township, Springettsbury
    19970S0188B1336                 - 26 -

     1             Township and York Township, Mill Creek
     2             Flood Control Project                       5,000,000
     3         (C)  Fairview Township, Flood Mitigation
     4             Project, relating to Meadowbrook Pump
     5             Station                                        50,000
     6         (D)  Franklintown Borough, flood control
     7             project relating to storm water
     8             management                                    367,000
     9         (E)  Yoe Borough and York Township,
    10             construction of retention basins on
    11             Mill Creek between Locust Avenue in
    12             York Township and Boundary Avenue in
    13             Yoe Borough                                   400,000
    14  (7)  Department of General Services                 $226,613,000  <--
    15  (7)  DEPARTMENT OF GENERAL SERVICES                 $406,873,000  <--
    16     (i)  Capitol Complex
    17         (A)  Upgrade chillers and humidification
    18             systems at the State Museum and
    19             Archives Buildings                            720,000
    20             (Base Project Allocation - $600,000)
    21             (Design and Contingencies - $120,000)
    22         (B)  Additional funds for DGS 948-37,
    23             expansion of central air conditioning
    24             system to Main Capitol, including
    25             funding to make the appropriate
    26             connections, remove the current chiller
    27             system and provide heating and cooling
    28             throughout                                 12,000,000
    29             (Base Project Allocation - $10,000,000)
    30             (Design and Contingencies - $2,000,000)
    19970S0188B1336                 - 27 -

     1         (C)  Additional funds for Project No. DGS
     2             948-35, Fire Safety Code Improvements,
     3             Capitol Complex to continue the fire
     4             safety improvements to the Capitol
     5             Building, North and South Office
     6             Buildings, Forum, Finance Building,
     7             Health and Welfare Building and Labor
     8             and Industry Building, including
     9             upgrading electrical system for code
    10             conformance, abatement of hazardous
    11             materials affecting construction,
    12             temporary relocation of occupants from
    13             construction areas (including new
    14             furniture and equipment needed for
    15             temporary arrangement) re-routing data,
    16             communication and other systems in
    17             alignment with fire safety power and
    18             lighting improvements and
    19             replacement/restoration of finishes in
    20             areas modified by fire safety
    21             improvements, for Phase I and
    22             subsequent phases                         138,750,000
    23             (Base Project Allocation -
    24             $111,000,000)
    25             (Design and Contingencies -
    26             $27,750,000)
    27         (D)  Additional funding for Project No. DGS
    28             946-2, renovation and conversion of Old
    29             Museum Building for legislative offices
    30             for the repair and restoration of the
    19970S0188B1336                 - 28 -

     1             Old Museum Building to include the
     2             plaza on the west face of the building,
     3             security lighting at basement driveway,
     4             restoration and modern replication of
     5             historic light fixtures with UL labels
     6             and miscellaneous renovation and
     7             restoration consistent with the
     8             intended purpose                            3,000,000  <--
     9             (Base Project Allocation - $2,400,000)
    10             (Design and Contingencies - $600,000)
    11             INTENDED PURPOSE                            9,660,000  <--
    12             (BASE PROJECT ALLOCATION - $8,050,000)
    13             (DESIGN AND CONTINGENCIES - $1,610,000)
    14         (E)  Repair and renovation of the Capitol
    15             Complex to provide for the repair of
    16             exterior walks, railings and exterior
    17             site improvements, the renovation of
    18             the Capitol basement and fifth floor
    19             corridors, the repair and installation
    20             of new catwalks, the renovation of
    21             public restrooms, the repair and
    22             upgrading of the plumbing system
    23             including the chilled drinking water
    24             system; the replacement of the East
    25             Wing parametric boards and upgraded
    26             HVAC direct digital control including
    27             Central Plant and all associated
    28             buildings, and the upgrade of power and
    29             lighting in Central Plant and service
    30             tunnels to the Capitol and associated
    19970S0188B1336                 - 29 -

     1             buildings                                  14,000,000
     2             (Base Project Allocation - $11,200,000)
     3             (Design and Contingencies - $2,800,000)
     4         (F)  Additional funding for Project No. DGS
     5             948-34, repair and restoration work for
     6             statuaries and north, south and center
     7             porticoes and plaza level entries of
     8             the Capitol Building to continue the
     9             repair and restoration of the masonry
    10             to the porches and porticoes of the
    11             Capitol Building                            1,000,000
    12             (Base Project Allocation - $800,000)
    13             (Design and Contingencies - $200,000)
    14         (G)  Additional funds for DGS 948-9,
    15             renovation of the Finance Building          5,203,000
    16             (Base Project Allocation - $4,336,000)
    17             (Design and Contingencies - $867,000)
    18         (H)  Acoustical improvements at The Forum       3,000,000
    19             (Base Project Allocation - $2,600,000)
    20             (Design and Contingencies - $400,000)
    21         (I)  Restoration of ceiling and wall murals
    22             at The Forum                                1,490,000
    23         (J)  Upgrade fire alarm and security
    24             systems in the State Museum and
    25             Archives Buildings                            700,000
    26             (Base Project Allocation - $600,000)
    27             (Design and Contingencies - $100,000)
    28         (K)  Upgrade and installation of new fire
    29             suppression system in the State Museum
    30             and Archives Buildings                      1,875,000
    19970S0188B1336                 - 30 -

     1             (Base Project Allocation - $1,500,000)
     2             (Design and Contingencies - $375,000)
     3         (L)  Upgrade electrical distribution system
     4             in the State Museum and Archives
     5             Buildings                                   4,750,000
     6             (Base Project Allocation - $3,800,000)
     7             (Design and Contingencies - $950,000)
     8         (M)  Repair compression joints and
     9             stabilize exterior cladding on Museum
    10             Building                                    1,000,000
    11             (Base Project Allocation - $800,000)
    12             (Design and Contingencies - $200,000)
    13         (N)  Upgrade HVAC systems including
    14             installation of humidification and
    15             filtration equipment in the State
    16             Museum and Archives Buildings               5,000,000
    17             (Base Project Allocation - $4,000,000)
    18             (Design and Contingencies - $1,000,000)
    19         (O)  Roof replacement State Museum
    20             Building                                    1,500,000
    21             (Base Project Allocation - $1,200,000)
    22             (Design and Contingencies - $300,000)
    23         (P)  Asbestos abatement in the State Museum
    24             and Archives Buildings                      1,000,000
    25             (Base Project Allocation - $800,000)
    26             (Design and Contingencies - $200,000)
    27         (Q)  Upgrade elevator and escalator systems
    28             in the State Museum Building                1,250,000
    29             (Base Project Allocation - $1,000,000)
    30             (Design and Contingencies - $250,000)
    19970S0188B1336                 - 31 -

     1         (R)  Reconstruction of roof and clean, seal
     2             and resecure exterior stone panels and
     3             doors at the State Museum and Archives
     4             Building                                      600,000
     5             (Base Project Allocation - $500,000)
     6             (Design and Contingencies - $100,000)
     7         (S)  Upgrade windows and clean, seal and
     8             caulk exterior of State Finance
     9             Building                                    6,600,000
    10             (Base Project Allocation - $5,500,000)
    11             (Design and Contingencies - $1,100,000)
    12         (T)  Upgrade windows and exterior door
    13             enclosures in Labor and Industry
    14             Building                                    5,280,000
    15             (Base Project Allocation - $4,400,000)
    16             (Design and Contingencies - $880,000)
    17         (U)  Upgrade windows and entrance doors and
    18             clean and seal exterior granite at
    19             Health and Welfare Building                 4,600,000
    20             (Base Project Allocation - $4,000,000)
    21             (Design and Contingencies - $600,000)
    22         (V)  ADDITIONAL FUNDING FOR PROJECT NO. DGS                <--
    23             948-36, WATERPROOFING OF MAIN CAPITOL,
    24             FOR CONSTRUCTION ON STAGING, HOISTS,
    25             CRANES AND SCAFFOLDING, ADDITIONAL
    26             PARKING, RESTORATION OF LANDSCAPING AND
    27             GROUNDS DISRUPTED BY CONSTRUCTION AT
    28             THE CAPITOL RESTORATION AND CLEANING OF
    29             MASONRY AND MISCELLANEOUS REPAIRS
    30             CONSISTENT WITH THE INTENDED PURPOSE        3,900,000
    19970S0188B1336                 - 32 -

     1             (BASE PROJECT ALLOCATION - $3,300,000)
     2             (DESIGN AND CONTINGENCIES - $600,000)
     3     (ii)  Farm Show Complex
     4         (A)  Upgrade exterior waterproof membrane,
     5             repoint and reset masonry and upgrade
     6             entrance doors at the Agriculture
     7             Building                                      518,000
     8             (Base Project Allocation - $450,000)
     9             (Design and Contingencies - $68,000)
    10     (iii)  Public Works Complex
    11         (A)  Reconstruction of exterior masonry and
    12             resealing of the exterior of the
    13             Arsenal Building and reconstruction of
    14             roof on former ammunition bunker now
    15             used as an archive                            150,000
    16             (Base Project Allocation - $125,000)
    17             (Design and Contingencies - $25,000)
    18     (iv)  Governor's Residence
    19         (A)  Upgrade the heating, ventilating and
    20             air-conditioning system                       127,000
    21             (Base Project Allocation - $110,000)
    22             (Design and Contingencies - $17,000)
    23     (V)  PHILADELPHIA STATE OFFICE BUILDING                        <--
    24         (A)  ADDITIONAL FUNDING FOR PROJECT NO. DGS
    25             943-6, IMPROVEMENTS TO THE PHILADELPHIA
    26             STATE OFFICE BUILDING, FOR THE REPAIR
    27             AND REPLACEMENT OF THE HEATING,
    28             VENTILATION AND AIR CONDITIONING
    29             EQUIPMENT AND SYSTEM COMPONENTS TO
    30             BRING THE BUILDING INTO COMPLIANCE WITH
    19970S0188B1336                 - 33 -

     1             OCCUPANCY CODES, INCLUDING HAZARDOUS
     2             MATERIAL ABATEMENT AND REPLACEMENT OF
     3             FINISHES AND BUILDING ELEMENTS
     4             NECESSARY TO ACHIEVE THE HVAC
     5             IMPROVEMENTS                               19,200,000
     6             (BASE PROJECT ALLOCATION - $16,000,000)
     7             (DESIGN AND CONTINGENCIES - $3,200,000)
     8     (VI)  SUMMERDALE LABORATORY COMPLEX
     9         (A)  BASIC INFRASTRUCTURE AND SITE
    10             DEVELOPMENT FOR THE LABORATORY COMPLEX
    11             IN SUMMERDALE, CUMBERLAND COUNTY            5,000,000
    12     (v) (VII)  Warner Theater, Erie County                         <--
    13         (A)  Conversion of the theater into a
    14             performing arts center including
    15             additions to the stage area,
    16             improvements to mechanical systems and
    17             installation of elevators                   7,000,000
    18             (Base Project Allocation - $5,833,000)
    19             (Design and Contingencies - $1,167,000)
    20         (B)  ERIE CIVIC CENTER, LOUIS J. TULLIO                    <--
    21             CONVENTION ARENA                              500,000
    22     (vi) (VIII)  Pennsylvania PUBLIC Law Center,                   <--
    23         Allegheny County
    24         (A)  Acquisition and construction               5,500,000
    25     (IX)  DAVID L. LAWRENCE CONVENTION CENTER                      <--
    26         (A)  EXPANSION OF CONVENTION CENTER           145,000,000
    27  (8)  Historical and Museum Commission                 $2,955,000  <--
    28  (8)  HISTORICAL AND MUSEUM COMMISSION                $32,156,000  <--
    29     (i)  Drake Well State Museum
    30         (A)  Boomtown and other exhibit development
    19970S0188B1336                 - 34 -

     1             and construction                            2,105,000
     2     (ii)  Niagara Maritime Museum
     3         (A)  Construction of fixed exhibits               750,000  <--
     4             (Base Project Allocation - $625,000)
     5             (Design and Contingencies - $125,000)
     6         (A)  CONSTRUCTION OF FIXED EXHIBITS             1,750,000  <--
     7     (iii)  Pithole State Museum
     8         (A)  Development and construction of
     9             exterior walkways, boardwalks and
    10             signage                                       100,000
    11     (IV)  RESTORATION OF NO. 9 MINE AND MUSEUM -                   <--
    12         LANSFORD
    13         (A)  RESTORATION                                1,850,000
    14             (BASE PROJECT ALLOCATION - $1,550,000)
    15             (DESIGN AND CONTINGENCIES - $300,000)
    16         (B)  RESTORATION OF SWITCH-BACK RAILROAD -
    17             SUMMIT HILL                                16,856,000
    18             (BASE PROJECT ALLOCATION - $14,388,000)
    19             (DESIGN AND CONTINGENCIES - $2,468,000)
    20     (V)  SOMERSET HISTORICAL CENTER
    21         (A)  ADDITIONAL FUNDS FOR DGS 990-2 FOR
    22             CONSTRUCTION OF AN ADDITION TO THE
    23             CENTER AND IMPROVEMENTS FOR PARKING AND
    24             ENTRANCE AREA                                 145,000
    25             (BASE PROJECT ALLOCATION - $145,000)
    26         (B)  ADDITIONAL FUNDS FOR DGS 990-2 FOR
    27             CONSTRUCTION OF FIXED EXHIBITS                150,000
    28             (BASE PROJECT ALLOCATION - $150,000)
    29     (VI)  FORT NECESSITY
    30         (A)  CONSTRUCTION OF THE NATIONAL ROAD
    19970S0188B1336                 - 35 -

     1             HERITAGE PARK EDUCATIONAL
     2             INTERPRETATIVE CENTER AT FORT
     3             NECESSITY                                   3,000,000
     4     (VII)  INSTALLATION OF FIRE PROTECTION SYSTEMS
     5         AT EACH OF THE LISTED MUSEUMS OR PARKS:
     6         (A)  ANTHRACITE HERITAGE MUSEUM                   180,000
     7             (BASE PROJECT ALLOCATION - $150,000)
     8             (DESIGN AND CONTINGENCIES - $30,000)
     9         (B)  BRANDYWINE BATTLEFIELD HISTORIC PARK         300,000
    10             (BASE PROJECT ALLOCATION - $250,000)
    11             (DESIGN AND CONTINGENCIES - $50,000)
    12         (C)  CONRAD WEISER HISTORIC PARK                  180,000
    13             (BASE PROJECT ALLOCATION - $150,000)
    14             (DESIGN AND CONTINGENCIES - $30,000)
    15         (D)  CORNWALL IRON FURNACE                        180,000
    16             (BASE PROJECT ALLOCATION - $150,000)
    17             (DESIGN AND CONTINGENCIES - $30,000)
    18         (E)  DANIEL BOONE HOMESTEAD                       300,000
    19             (BASE PROJECT ALLOCATION - $250,000)
    20             (DESIGN AND CONTINGENCIES - $50,000)
    21         (F)  DRAKE WELL MUSEUM                            300,000
    22             (BASE PROJECT ALLOCATION - $250,000)
    23             (DESIGN AND CONTINGENCIES - $50,000)
    24         (G)  ECKLEY MINER'S VILLAGE                       300,000
    25             (BASE PROJECT ALLOCATION - $250,000)
    26             (DESIGN AND CONTINGENCIES - $50,000)
    27         (H)  EPHRATA CLOISTER                             600,000
    28             (BASE PROJECT ALLOCATION - $500,000)
    29             (DESIGN AND CONTINGENCIES - $100,000)
    30         (I)  FORT PITT MUSEUM                             120,000
    19970S0188B1336                 - 36 -

     1             (BASE PROJECT ALLOCATION - $100,000)
     2             (DESIGN AND CONTINGENCIES - $20,000)
     3         (J)  GRAEME PARK                                  120,000
     4             (BASE PROJECT ALLOCATION - $100,000)
     5             (DESIGN AND CONTINGENCIES - $20,000)
     6         (K)  HOPE LODGE/MATHER MILL                       180,000
     7             (BASE PROJECT ALLOCATION - $150,000)
     8             (DESIGN AND CONTINGENCIES - $30,000)
     9         (L)  JOSEPH PRIESTLEY HOUSE                       120,000
    10             (BASE PROJECT ALLOCATION - $100,000)
    11             (DESIGN AND CONTINGENCIES - $20,000)
    12         (M)  LANDIS VALLEY MUSEUM                         600,000
    13             (BASE PROJECT ALLOCATION - $500,000)
    14             (DESIGN AND CONTINGENCIES - $100,000)
    15         (N)  OLD ECONOMY VILLAGE                          600,000
    16             (BASE PROJECT ALLOCATION - $500,000)
    17             (DESIGN AND CONTINGENCIES - $100,000)
    18         (O)  PENNSBURY MANOR                              360,000
    19             (BASE PROJECT ALLOCATION - $300,000)
    20             (DESIGN AND CONTINGENCIES - $60,000)
    21         (P)  PENNSYLVANIA LUMBER MUSEUM                   300,000
    22             (BASE PROJECT ALLOCATION - $250,000)
    23             (DESIGN AND CONTINGENCIES - $50,000)
    24         (Q)  PENNSYLVANIA MILITARY MUSEUM                 180,000
    25             (BASE PROJECT ALLOCATION - $150,000)
    26             (DESIGN AND CONTINGENCIES - $30,000)
    27         (R)  RAILROAD MUSEUM OF PENNSYLVANIA              180,000
    28             (BASE PROJECT ALLOCATION - $150,000)
    29             (DESIGN AND CONTINGENCIES - $30,000)
    30         (S)  WASHINGTON CROSSING HISTORIC PARK            600,000
    19970S0188B1336                 - 37 -

     1             (BASE PROJECT ALLOCATION - $500,000)
     2             (DESIGN AND CONTINGENCIES - $100,000)
     3     (VIII)  LANDIS VALLEY MUSEUM
     4         (A)  STORAGE BUILDING AND HANDS-ON-HOUSE
     5             MUSEUM                                        500,000
     6  (9)  Department of Labor and Industry                 $7,000,000
     7     (i)  Hiram G. Andrews Center
     8         (A)  Upgrade and repair of facility             7,000,000
     9  (10)  Department of Military and Veterans Affairs    $26,628,000  <--
    10  (10)  DEPARTMENT OF MILITARY AND VETERANS AFFAIRS    $41,963,000  <--
    11     (i)  Cambria County Armory at Johnstown
    12         (A)  Renovation and addition                    1,380,000
    13             (Base Project Allocation - $1,150,000)
    14             (Design and Contingencies - $230,000)
    15     (II)  ERIE, SOLDIERS AND SAILORS HOME                          <--
    16         (A)  NEW CONSTRUCTION OF TWO SUN ROOMS AND
    17             CONVERSION OF EXISTING PORCH TO A SUN
    18             ROOM IN THE PATIENT CARE BUILDING             470,000
    19             (BASE PROJECT ALLOCATION - $392,000)
    20             (DESIGN AND CONTINGENCIES - $78,000)
    21     (ii) (III)  Franklin County Veterans Care                      <--
    22         Facility
    23         (A)  South Mountain Restoration Center         12,000,000
    24             (Base Project Allocation - $10,400,000)
    25             (Design and Contingencies - $1,600,000)
    26     (iii) (IV)  Hollidaysburg Veterans Home                        <--
    27         (A)  Improvements to facility roadways and
    28             parking lots                                1,000,000
    29     (iv) (V)  Southeastern Veterans Home                           <--
    30         (A)  Expansion of parking facility                285,000
    19970S0188B1336                 - 38 -

     1     (v) (VI)  Scotland School                                      <--
     2         (A)  Additional funds for project DGS 415-
     3             29, reconstruction of the main dining
     4             hall                                          500,000
     5     (vi) (VII)  Western maneuver training area                     <--
     6         (A)  To acquire three parcels of land,
     7             5,300 acres more or less, to establish
     8             a tracked vehicle maneuver training
     9             area in Western Pennsylvania for the
    10             Pennsylvania National Guard                 8,000,000
    11     (VIII)  EASTON ARMORY IN NORTHAMPTON COUNTY                    <--
    12         (A)  CONSTRUCTION OF A NEW FACILITY IN
    13             NORTHAMPTON COUNTY AND SUPPORTING
    14             FACILITIES TO INCLUDE MILITARY AND OFF-
    15             STREET PARKING, ACCESS ROADS AND
    16             SIDEWALKS                                   1,370,000
    17             (BASE PROJECT ALLOCATION - $1,000,000)
    18             (LAND ALLOCATION - $70,000)
    19             (DESIGN AND CONTINGENCIES - $300,000)
    20     (vii) (IX)  Armory at Latrobe                                  <--
    21         (A)  Construction of a new armory at
    22             Latrobe, Westmoreland County to replace
    23             existing armories at Blairsville and
    24             Latrobe                                     1,800,000
    25             (Base Project Allocation - $1,300,000)
    26             (Land Allocation - $300,000)
    27             (Design and Contingencies - $200,000)
    28     (viii) (X)  Armory at Tioga County                             <--
    29         (A)  Construction of a new armory in Tioga
    30             County to replace existing armories at
    19970S0188B1336                 - 39 -

     1             Mansfield and Wellsboro                     1,363,000
     2             (Base Project Allocation - $1,163,000)
     3             (Design and Contingencies - $200,000)
     4     (ix) (XI)  Maintenance Shop at Johnstown                       <--
     5         (A)  Land acquisition for the construction
     6             of an operations maintenance shop at
     7             Johnstown, Cambria County                     300,000
     8     (XII)  CAMBRIA COUNTY WAR MEMORIAL EXPANSION       10,000,000  <--
     9     (XIII)  PENNSYLVANIA VETERANS MEMORIAL
    10         (A)  CONSTRUCTION OF THE PENNSYLVANIA
    11             VETERANS MEMORIAL AT FORT INDIANTOWN
    12             GAP IN LEBANON COUNTY. THIS PROJECT
    13             WILL BE CONSTRUCTED ENTIRELY WITH
    14             PRIVATE DONATIONS, THEREFORE REQUIRING
    15             NO STATE FUNDS                              3,495,000
    16             (BASE PROJECT ALLOCATION - $3,000,000)
    17             (DESIGN AND CONTINGENCIES - $495,000)
    18  (11)  Department of Public Welfare                   $13,744,000  <--
    19  (11)  DEPARTMENT OF PUBLIC WELFARE                   $14,844,000  <--
    20     (i)  Norristown State Hospital
    21         (A)  Reconstruction or replacement of
    22             boilers to meet emissions requirements
    23             and upgrade the steam distribution
    24             system                                      3,924,000
    25             (Base Project Allocation - $3,270,000)
    26             (Design and Contingencies - $654,000)
    27     (ii)  Clarks Summit State Hospital
    28         (A)  Additional funds for project DGS 502-
    29             25, renovation of power plant boilers
    30             and distribution system                     4,480,000
    19970S0188B1336                 - 40 -

     1             (Base Project Allocation - $3,480,000)
     2             (Design and Contingencies - $1,000,000)
     3     (iii)  Danville State Hospital
     4         (A)  Installation of upgraded high voltage
     5             distribution cables throughout system         540,000
     6             (Base Project Allocation - $450,000)
     7             (Design and Contingencies - $90,000)
     8         (B)  INSTALL PERIMETER FENCE AROUND THE                    <--
     9             REED BUILDING FOR THE SECURE JUVENILE
    10             FACILITY                                      200,000
    11             (BASE PROJECT ALLOCATION - $167,000)
    12             (DESIGN AND CONTINGENCIES - $33,000)
    13     (iv)  South Mountain Restoration Center
    14         (A)  Installation of integrated and updated
    15             fire alarm system for entire facility       2,160,000
    16             (Base Project Allocation - $1,800,000)
    17             (Design and Contingencies - $360,000)
    18     (v)  Ebensburg Center
    19         (A)  Additional funds for project DGS 583-
    20             11, replacement of steam lines                720,000
    21             (Base Project Allocation - $600,000)
    22             (Design and Contingencies - $120,000)
    23     (vi)  Polk Center
    24         (A)  Installation of integrated and updated
    25             fire alarm system for entire facility       1,440,000
    26             (Base Project Allocation - $1,200,000)
    27             (Design and Contingencies - $240,000)
    28     (vii)  White Haven Center
    29         (A)  Upgrade of electrical distribution
    30             system                                        480,000
    19970S0188B1336                 - 41 -

     1             (Base Project Allocation - $400,000)
     2             (Design and Contingencies - $80,000)
     3     (VIII)  LOYSVILLE YOUTH DEVELOPMENT CENTER                     <--
     4         (A)  INSTALL UPGRADED LOCKS FOR SELECTED
     5             SECURE AREAS                                  100,000
     6             (BASE PROJECT ALLOCATION - $83,000)
     7             (DESIGN AND CONTINGENCIES - $17,000)
     8         (B)  INSTALL A PERIMETER INTRUSION
     9             DETECTION AND WARNING SYSTEM                  180,000
    10             (BASE PROJECT ALLOCATION - $150,000)
    11             (DESIGN AND CONTINGENCIES - $30,000)
    12     (IX)  NEW CASTLE YOUTH DEVELOPMENT CENTER
    13         (A)  INSTALL UPGRADED LOCKS FOR SELECTED
    14             SECURE AREAS                                  135,000
    15             (BASE PROJECT ALLOCATION - $113,000)
    16             (DESIGN AND CONTINGENCIES - $22,000)
    17     (X)  BENSALEM YOUTH DEVELOPMENT CENTER
    18         (A)  INSTALL ELECTRONIC MONITORING SYSTEM
    19             AND VISITOR CENTER                            300,000
    20             (BASE PROJECT ALLOCATION - $250,000)
    21             (DESIGN AND CONTINGENCIES - $50,000)
    22         (B)  REPLACE UNDERGROUND HIGH VOLTAGE
    23             PRIMARY ELECTRICAL CABLING                    185,000
    24             (BASE PROJECT ALLOCATION - $154,000)
    25             (DESIGN AND CONTINGENCIES - $31,000)
    26  (12)  Pennsylvania State Police                       $4,680,000
    27     (i)  Trevose Station, Bucks County
    28         (A)  Demolition of existing structure and
    29             construction of new building on site        2,000,000
    30     (ii)  Hollidaysburg Troop Headquarters
    19970S0188B1336                 - 42 -

     1         (A)  Additional funds for DGS 201-3,
     2             renovation and expansion of
     3             headquarters                                2,680,000
     4             (Base Project Allocation - $2,233,000)
     5             (Design and Contingencies - $447,000)
     6  (13)  State System of Higher Education              $565,270,000  <--
     7  (13)  STATE SYSTEM OF HIGHER EDUCATION              $562,538,000  <--
     8     (i)  Bloomsburg State University
     9         (A)  Addition to Hartline Science               6,348,000  <--
    10         (B)  Renovation of Navy Hall                    4,288,000
    11         (A)  ADDITION TO HARTLINE SCIENCE               6,806,000  <--
    12         (B)  RENOVATION OF NAVY HALL                    4,710,000
    13         (C)  Renovation of Andrus Building              7,280,000
    14     (ii)  California State University
    15         (A)  Demolition of Reed Hall                      330,000
    16         (B)  Renovation of Old Main and South Hall      8,827,000
    17         (C)  Addition to and renovation of Steel
    18             Auditorium                                  5,718,000
    19         (D)  Renovation of Vulcan Hall                  1,668,000
    20         (E)  Renovation of Noss Hall                    3,366,000
    21         (F)  Installation of water back flow
    22             preventers, campuswide                        497,000
    23         (G)  Pedestrian and vehicular enhancement,
    24             Phase I                                     4,592,000
    25     (iii)  Cheyney University of Pennsylvania
    26         (A)  Addition to and renovation of athletic
    27             facility                                    3,022,000
    28         (B)  Infrastructure renovations, Phase II       2,916,000
    29         (C)  Renovation of Bailey Hall                  4,369,000
    30     (iv)  Clarion State University
    19970S0188B1336                 - 43 -

     1         (A)  Renovate/upgrade communication and
     2             electrical system                           4,944,000
     3         (B)  Replace steam lines - Phase III            5,476,000
     4         (C)  Addition to and renovation of Carlson
     5             Library                                    17,060,000
     6         (D)  Renovation of Pierce Science Center       19,762,000
     7     (v)  East Stroudsburg State University
     8         (A)  Renovation of Rosenkrans Hall              3,875,000
     9         (B)  Addition to and renovation of
    10             auditorium                                  4,900,000
    11         (C)  Renovation of LeRue Arts                     861,000
    12         (D)  Upgrade infrastructure and storm water
    13             management system                           4,920,000
    14         (E)  Addition to and renovation of stadium
    15             complex                                     3,226,000
    16         (F)  Renovation of Fine and Performing Arts
    17             Building                                    1,080,000
    18         (G)  Renovation of and addition to
    19             storeroom and garage                        2,378,000
    20     (vi)  Edinboro State University
    21         (A)  Renovation of Butterfield Hall             4,936,000
    22         (B)  Rehabilitation of campus
    23             infrastructure                              5,820,000
    24         (C)  Renovation of Memorial Auditorium          2,498,000
    25         (D)  Renovation of Heather Hall                 2,267,000
    26         (E)  Renovation of Baron-Forness Library        5,772,000
    27     (vii)  Indiana State University
    28         (A)  Renovation of Stabley Library              4,632,000
    29         (B)  Construction of a replacement facility
    30             for Wyandt Hall, Armstrong Campus           5,250,000
    19970S0188B1336                 - 44 -

     1         (C)  Construction of a replacement facility
     2             for Old Main, Punxsutawney Campus           4,632,000
     3         (D)  Addition to and renovation of Cogswell
     4             Hall                                        8,888,000
     5         (E)  Renovation of Keith Hall                   7,057,000
     6         (F)  Renovation of John Sutton Hall - Phase
     7             I                                           7,382,000
     8         (G)  Renovation of Leonard Hall                 5,252,000
     9     (viii)  Kutztown State University
    10         (A)  Renovation of Graduate Center              3,598,000
    11         (B)  Addition to and renovation of science
    12             buildings                                  18,662,000
    13         (C)  Construction of Kutztown University
    14             access road                                 2,760,000
    15         (D)  Renovation of Shaeffer Auditorium          5,206,000
    16         (E)  Addition to or renovation of
    17             maintenance building                        4,198,000
    18         (F)  Renovation and upgrade of boiler
    19             plant                                       2,857,000
    20         (G)  Renovation of Reisley Hall                 2,635,000
    21     (ix)  Lock Haven State University
    22         (A)  Renovation of New Ulmer Hall               6,720,000
    23         (B)  Renovation of Zimmerli Gym                 7,306,000
    24         (C) Addition to and renovation of Jack
    25             Stadium - Phase III                         2,798,000
    26         (D)  Renovation of Lusk Run Conduit             1,560,000
    27         (E)  Construction of building to serve as
    28             branch campus in Clearfield County          5,000,000
    29     (x)  Mansfield State University
    30         (A)  Addition to and renovation of Grant
    19970S0188B1336                 - 45 -

     1             Science                                     9,959,000
     2         (B)  Addition to and renovation of home
     3             economics center                            6,672,000
     4         (C)  Renovation of South Hall                   4,178,000
     5     (xi)  Millersville State University
     6         (A)  Addition to and renovation of McComsey
     7             Hall                                        7,657,000
     8         (B)  Renovation of Gerhart Hall                   236,000
     9         (C)  Addition to and renovation of Stayer
    10             Hall                                        6,835,000
    11         (D)  Renovation of Roddy Science Center         5,870,000
    12         (E)  Renovation of Lyle Hall                    2,681,000
    13         (F)  Renovation of Osburn Hall                  4,198,000
    14         (G)  Renovation of Ganser Building              5,914,000
    15         (H)  Renovation of Wickersham Hall              2,123,000
    16         (I)  Upgrade of electrical utility system       6,480,000
    17     (xii)  Shippensburg State University
    18         (A)  Renovation of Horton Hall                  6,920,000
    19         (B)  Renovation of Gilbert and Stewart
    20             Halls                                       3,478,000
    21         (C)  Construction of instructional arts
    22             facility                                   19,853,000
    23         (D)  Addition to and renovation of Lehman
    24             Library                                    19,778,000
    25         (E)  Reconstruction of roadways, sidewalks
    26             and parking facilities                      4,618,000
    27         (F)  Renovation of Franklin Science Center     14,514,000
    28         (G)  Renovation of Huber Arts Center and
    29             Counselor Education Building                2,798,000
    30         (H)  Addition to and renovation of Shippen
    19970S0188B1336                 - 46 -

     1             Hall                                       15,814,000
     2         (I)  Upgrade Steam Plant Boiler No. 4             563,000
     3         (J)  Renovation of Rowland and Shearer
     4             Halls                                       5,167,000
     5         (K)  Renovation of Dauphin Humanities           4,124,000
     6         (L)  Construction of Central Services
     7             Building                                    1,529,000
     8     (xiii)  Slippery Rock State University
     9         (A)  Renovation of Vincent Science                         <--
    10             Building                                   13,672,000
    11         (B)  Renovation of West Hall                    2,260,000
    12         (C)  Renovation of Morrow Field House          12,564,000
    13         (D)  Reconstruction of roadways, sidewalks
    14             and parking areas                           2,244,000
    15         (E)  Construction of health professionals
    16             building                                   12,324,000
    17         (A)  RENOVATION OF VINCENT SCIENCE                         <--
    18             BUILDING                                   14,442,000
    19         (B)  RENOVATION OF WEST HALL                    2,297,000
    20         (C)  RENOVATION OF MORROW FIELD HOUSE          14,643,000
    21         (D)  RECONSTRUCTION OF ROADWAYS, SIDEWALKS
    22             AND PARKING AREAS                           1,530,000
    23         (E)  CONSTRUCTION OF PHYSICAL THERAPY
    24             BUILDING                                    6,540,000
    25         (F)  Renovation of steam distribution
    26             system - Phase II                           7,680,000
    27     (xiv)  West Chester State University
    28         (A)  Renovation of Francis Harvey Green
    29             Building                                    4,154,000
    30         (B)  Construction of classroom facility        12,959,000
    19970S0188B1336                 - 47 -

     1         (C)  Renovation of Schmucker Science -
     2             Phase III                                  15,842,000
     3         (D)  Renovation of Lawrence Hall                3,051,000
     4         (E)  Construction of
     5             computing/instructional technology
     6             center                                     10,931,000
     7         (F)  Construction of all-purpose outdoor
     8             physical education and athletic fields      3,314,000
     9         (G)  Infrastructure Upgrade/code updates -
    10             Phase I                                    11,158,000
    11         (H)  Construction of Recital Hall               3,317,000
    12         (I)  Addition to and renovation of Eringer
    13             Gym and Special Education Building          3,883,000
    14     (xv)  Systemwide project
    15         (A)  Alteration of facilities for ADA
    16             compliance                                 34,569,000
    17  (14)  Department of Transportation                   $70,832,000  <--
    18  (14)  DEPARTMENT OF TRANSPORTATION                  $175,532,000  <--
    19     (i)  Road Signage
    20         (A)  Purchase and erection of highway signs
    21             in Fayette, Westmoreland and Somerset
    22             Counties to promote access to Laurel
    23             Highlands                                     400,000
    24         (B)  PURCHASE AND ERECTION OF HIGHWAY SIGNS                <--
    25             IN THE SURROUNDING AND ADJACENT
    26             COUNTIES TO PROMOTE THE ALLEGHENY
    27             NATIONAL FOREST AND KINZUA RESERVOIR          350,000
    28     (ii)  Erie County Welcome Center
    29         (A)  Additional funds to construct a new
    30             welcome center                              3,423,000
    19970S0188B1336                 - 48 -

     1             (Base Project Allocation - $2,759,000)
     2             (Land Allocation - $120,000)
     3             (Design and Contingencies - $544,000)
     4     (iii)  Harrisburg International Airport
     5         (A)  Replacement of the concrete surface of
     6             runway 13-31                               11,268,000
     7             (Base Project Allocation - $11,268,000)
     8         (B)  Construction of a centralized de-icing
     9             facility and the modification of the
    10             hold pad at runway 13 for secondary de-
    11             icing                                       8,936,000
    12             (Base Project Allocation - $8,936,000)
    13     (iv)  Allegheny County
    14         (A)  High performance precision
    15             manufacturing technology development by
    16             the Institute for Precision
    17             Technologies for use in bridge
    18             structures, hermetically sealed box
    19             beams and other metal fabricated
    20             infrastructure components for
    21             transportation systems                      1,000,000
    22         (B)  High performance precision
    23             manufacturing technology development by
    24             the Institute for Precision
    25             Technologies for use in bridge
    26             structures, hermetically sealed box
    27             beams and other metal fabricated
    28             infrastructure components for
    29             transportation systems                     25,000,000
    30             (Base Project Allocation - $24,000,000)
    19970S0188B1336                 - 49 -

     1             (Design and Contingencies - $1,000,000)
     2     (v)  Blair County
     3         (A)  Construction of new maintenance
     4             building at District 9-0 headquarters         700,000
     5             (Base Project Allocation - $645,000)
     6             (Design and Contingencies - $55,000)
     7     (VI)  LACKAWANNA COUNTY                                        <--
     8         (A)  BOROUGH OF TAYLOR, ROAD CONSTRUCTION,
     9             INCLUDING STORM SEWERS AND CURBING ON
    10             OAK STREET FROM KEYSER AVENUE TO MAIN
    11             STREET                                      2,400,000
    12             (BASE PROJECT ALLOCATION - $2,000,000
    13             (DESIGN AND CONTINGENCIES - $400,000
    14         (B)  BOROUGH OF TAYLOR, ROAD
    15             RECONSTRUCTION, INCLUDING STORM SEWERS
    16             AND CURBING ON KEYSER AVENUE, FROM THE
    17             TAYLOR/SCRANTON LINE TO THE TAYLOR/OLD
    18             FORGE LINE                                  3,600,000
    19             (BASE PROJECT ALLOCATION - $3,000,000)
    20             (DESIGN AND CONTINGENCIES - $600,000)
    21         (C)  BOROUGH OF TAYLOR, ROAD
    22             RECONSTRUCTION, INCLUDING STORM SEWERS
    23             AND CURBING ON UNION STREET FROM KEYSER
    24             AVENUE TO NORTH MAIN STREET                 3,600,000
    25             (BASE PROJECT ALLOCATION - $3,000,000)
    26             (DESIGN AND CONTINGENCIES - $600,000)
    27         (D)  BOROUGH OF TAYLOR, ROAD
    28             RECONSTRUCTION, INCLUDING STORM SEWERS
    29             AND CURBING ON MAIN STREET FROM THE
    30             TAYLOR/SCRANTON LINE TO THE TAYLOR/OLD
    19970S0188B1336                 - 50 -

     1             FORGE LINE                                  3,600,000
     2             (BASE PROJECT ALLOCATION - $3,000,000)
     3             (DESIGN AND CONTINGENCIES - $600,000)
     4         (E)  BOROUGH OF DUNMORE, ROAD
     5             RECONSTRUCTION, INCLUDING STORM SEWERS
     6             AND CURBING ON BLAKELY STREET FROM THE
     7             DUNMORE/THROOP LINE TO DUNMORE/SCRANTON
     8             LINE                                        3,600,000
     9             (BASE PROJECT ALLOCATION - $3,000,000)
    10             (DESIGN AND CONTINGENCIES - $600,000)
    11         (F)  BOROUGH OF DUNMORE, ROAD
    12             RECONSTRUCTION, INCLUDING STORM SEWERS
    13             AND CURBING ON GREEN RIDGE STREET FROM
    14             DUNMORE/SCRANTON LINE TO BLAKELY
    15             STREET, DUNMORE                             4,800,000
    16             (BASE PROJECT ALLOCATION - $4,000,000)
    17             (DESIGN AND CONTINGENCIES - $800,000)
    18         (G)  BOROUGH OF DUNMORE, ROAD
    19             RECONSTRUCTION, INCLUDING STORM SEWERS
    20             AND CURBING ON DRINKER STREET FROM
    21             BLAKELY STREET TO I-81                      3,600,000
    22             (BASE PROJECT ALLOCATION - $3,000,000)
    23             (DESIGN AND CONTINGENCIES - $600,000)
    24         (H)  BOROUGH OF THROOP, ROAD
    25             RECONSTRUCTION, INCLUDING STORM SEWERS
    26             AND CURBING ON CYPRESS STREET
    27             (NORTHBOUND AND SOUTHBOUND LANES) FROM
    28             THROOP/DUNMORE LINE TO THROOP/OLYPHANT
    29             LINE                                        6,000,000
    30             (BASE PROJECT ALLOCATION - $5,000,000)
    19970S0188B1336                 - 51 -

     1             (DESIGN AND CONTINGENCIES - $1,000,000)
     2         (I)  CITY OF SCRANTON, ROAD RECONSTRUCTION,
     3             INCLUDING STORM SEWERS AND CURBING ON
     4             GREEN RIDGE STREET FROM NORTH MAIN
     5             AVENUE TO SCRANTON/DUNMORE LINE             4,800,000
     6             (BASE PROJECT ALLOCATION - $4,000,000)
     7             (DESIGN AND CONTINGENCIES - $800,000)
     8         (J)  CITY OF SCRANTON, ROAD RECONSTRUCTION,
     9             INCLUDING STORM SEWERS AND CURBING ON
    10             PROVIDENCE ROAD FROM OLIVE STREET TO
    11             NORTH MAIN AVENUE                           3,600,000
    12             (BASE PROJECT ALLOCATION - $3,000,000)
    13             (DESIGN AND CONTINGENCIES - $600,000)
    14         (K)  CITY OF SCRANTON, ROAD RECONSTRUCTION,
    15             INCLUDING STORM SEWERS AND CURBING ON
    16             MAIN AVENUE FROM SCRANTON/TAYLOR LINE
    17             TO SCRANTON/DICKSON CITY LINE               4,800,000
    18             (BASE PROJECT ALLOCATION - $4,000,000)
    19             (DESIGN AND CONTINGENCIES - $800,000)
    20         (L)  CITY OF SCRANTON, ROAD RECONSTRUCTION,
    21             INCLUDING STORM SEWERS AND CURBING ON
    22             KEYSER AVENUE FROM SCRANTON/TAYLOR LINE
    23             TO WEST MARKET STREET                       6,000,000
    24             (BASE PROJECT ALLOCATION - $5,000,000)
    25             (DESIGN AND CONTINGENCIES - $1,000,000)
    26         (M)  CITY OF SCRANTON, ROAD RECONSTRUCTION,
    27             INCLUDING STORM SEWERS AND CURBING ON
    28             JACKSON STREET FROM KEYSER AVENUE TO
    29             NEWTON ROAD                                 2,400,000
    30             (BASE PROJECT ALLOCATION - $2,000,000)
    19970S0188B1336                 - 52 -

     1             (DESIGN AND CONTINGENCIES - $400,000)
     2         (N)  CITY OF SCRANTON, ROAD RECONSTRUCTION,
     3             INCLUDING STORM SEWERS AND CURBING ON
     4             NEWTON ROAD FROM JACKSON STREET TO
     5             SCRANTON/RANSOM TOWNSHIP LINE               4,800,000
     6             (BASE PROJECT ALLOCATION - $4,000,000)
     7             (DESIGN AND CONTINGENCIES - $800,000)
     8         (O)  CITY OF SCRANTON, ROAD RECONSTRUCTION,
     9             INCLUDING STORM SEWERS AND CURBING ON
    10             LUZERNE STREET FROM NORTH MAIN AVENUE
    11             TO KEYSER AVENUE                            4,800,000
    12             (BASE PROJECT ALLOCATION - $4,000,000)
    13             (DESIGN AND CONTINGENCIES - $800,000)
    14         (P)  BOROUGH OF DUNMORE, FLOOD CONTROL AND
    15             STORM WATER PROJECT, INCLUDING, BUT NOT
    16             LIMITED TO, STORM SEWERS AND ROAD
    17             RECONSTRUCTION AND PUMPING STATIONS IN
    18             THE AREA OF CLAY AVENUE, QUINCY AVENUE,
    19             MADISON AVENUE, JEFFERSON AVENUE AND
    20             ADAMS AVENUE; MARION STREET, GREEN
    21             RIDGE STREET AND ELECTRIC STREET            2,400,000
    22             (BASE PROJECT ALLOCATION - $2,000,000)
    23             (DESIGN AND CONTINGENCIES - $400,000)
    24         (Q)  BOROUGH OF TAYLOR, FLOOD CONTROL AND
    25             STORM WATER PROJECT, INCLUDING, BUT NOT
    26             LIMITED TO, STORM SEWERS AND ROAD
    27             RECONSTRUCTION AND PUMPING STATIONS IN
    28             THE AREA OF GREEN VIEW WEST, INCLUDING
    29             WALNUT STREET, OAK STREET, WILLIAMS
    30             STREET, AND PRINCE STREET; MACKIE LANE,
    19970S0188B1336                 - 53 -

     1             VINE LANE, LAUREL LANE, CHESTER LANE
     2             AND BICHLER LANE; RINALDI DRIVE,
     3             BARBARA DRIVE; DONNY DRIVE AND ANTHONY
     4             DRIVE                                       2,400,000
     5             (BASE PROJECT ALLOCATION) - $2,000,000)
     6             (DESIGN AND CONTINGENCIES - $400,000)
     7     (vi) (VII)  Montgomery County                                  <--
     8         (A)  Reconstruction and Rehabilitation of
     9             Main Street from Beaver Street to
    10             Prospect Avenue, Borough of North
    11             Wales                                       1,715,000
    12     (vii) (VIII)  Montour County                                   <--
    13         (A)  Additional Funds for project DGS 251-
    14             35, construction of transportation
    15             maintenance shed                              500,000
    16         (B)  CONSTRUCTION OF A SATELLITE                           <--
    17             MAINTENANCE BUILDING                        1,200,000
    18     (viii) (IX)  Philadelphia, Delaware and Bucks                  <--
    19         Counties
    20         (A)  Dredging of the channel of the
    21             Delaware River from 40 to 45 feet          15,000,000
    22     (ix) (X)  City of Erie                                         <--
    23         (A)  Improvements to city enterprise zone
    24             transportation infrastructure                 530,000
    25     (x)  Tioga County                                              <--
    26         (A)  Grand Canyon State Airport
    27             (I)  Construction of 20 hangars               500,000
    28             (Base Project Allocation - $400,000)
    29             (Design and Contingencies - $100,000)
    30     (xi)  Adams County Welcome Center
    19970S0188B1336                 - 54 -

     1         (A)  Additional funds for project DGS 657-
     2             6, to construct a new welcome center          540,000
     3             (Base Project Allocation - $450,000)
     4             (Design and Contingencies - $90,000)
     5     (xii)  Susquehanna County Welcome Center
     6         (A)  Additional funds for project DGS 657-
     7             13, to construct welcome center in
     8             Great Bend Township                         1,320,000
     9             (Base Project Allocation - $1,100,000)
    10             (Design and Contingencies - $220,000)
    11     (XIII)  HARRISBURG AREA                                        <--
    12         (A)  ADDITIONAL FUNDS FOR A NEW TESTING
    13             LABORATORY                                 14,400,000
    14             (BASE PROJECT ALLOCATION - $12,000,000)
    15             (DESIGN AND CONTINGENCIES - $2,400,000)
    16     (XIV)  VENANGO COUNTY
    17         (A)  ACQUISITION OF A NEW DISTRICT OFFICE
    18             BUILDING IN OIL CITY                        1,000,000
    19     (XV)  FOREST COUNTY
    20         (A)  CONSTRUCTION OF NEW WELCOME CENTER           350,000
    21     (XVI)  MCKEAN COUNTY
    22         (A)  CONSTRUCTION OF NEW WELCOME CENTER           350,000
    23     (XVII)  WARREN COUNTY
    24         (A)  CONSTRUCTION OF NEW WELCOME CENTER           350,000
    25     (XVIII)  PORT OF PHILADELPHIA
    26         (A)  IMPROVEMENTS TO THE AMERIPORT
    27             INTERMODAL CONNECTION FACILITY              5,000,000
    28         (B)  ACQUISITION OF TWO CRANES CAPABLE OF
    29             HANDLING 56-FOOT OR LARGER SHIPPING
    30             CONTAINERS                                 15,000,000
    19970S0188B1336                 - 55 -

     1  Section 4.  Itemization of furniture and equipment projects.
     2     Additional capital projects in the category of public
     3  improvement projects consisting of the acquisition of movable
     4  furniture and equipment to complete public improvement projects
     5  and to be purchased by the Department of General Services, its
     6  successors or assigns, and to be financed by the incurring of
     7  debt, are hereby itemized, together with their respective
     8  estimated financial costs, as follows:
     9                                                           Total
    10                                                          Project
    11             Project                                    Allocation
    12  (1)  Department of Agriculture                          $804,000
    13     (i)  Agriculture Laboratory
    14         (A)  Original furniture and equipment for
    15             Agriculture laboratory DGS 700-32             804,000
    16  (2)  Department of Conservation and Natural
    17     Resources                                            $270,000
    18     (i)  Greenwood Furnace State Park
    19         (A)  Original furniture and equipment to
    20             develop picnic and camping facilities,
    21             DGS 129-1                                      90,000
    22         (B)  Original furniture and equipment for
    23             administrative and support structures,
    24             DGS 129-2                                      90,000
    25     (ii)  Pymatuning State Park
    26         (A)  Original furniture and equipment to
    27             rehabilitate Linesville boat livery DGS
    28             103-4                                          70,000
    29     (iii)  Sinnemahoning State Park
    30         (A)  Original furniture and equipment to
    19970S0188B1336                 - 56 -

     1             reconstruct spillway and control tower
     2             DGS 104-4                                      20,000
     3  (3)  Department of Education                         $18,037,000
     4     (i)  The Pennsylvania State University
     5         (A)  University Park Campus
     6             (I)  Renovation of animal diagnostic
     7                 laboratory and incinerator DGS 800-
     8                 244                                       240,000
     9             (II)  Electrical distribution system
    10                 DGS 800-217                               390,000
    11         (B)  Behrend Campus
    12             (I)  Multipurpose facility for student
    13                 activities DGS 800-220                  1,550,000
    14         (C)  Berks Campus
    15             (I)  Acquisition of land and
    16                 development of an agricultural
    17                 instruction center DGS 800-204            850,000
    18         (D)  Fayette Campus
    19             (I)  Multipurpose technological-
    20                 cultural "Southwest Institute" DGS
    21                 800-209                                   620,000
    22             (II)  Agricultural sciences
    23                 classroom/laboratory building DGS
    24                 800-210                                   460,000
    25             (III)  Biomedical technology center DGS
    26                 800-238                                   660,000
    27         (E)  Harrisburg Campus
    28             (I)  Original furniture and equipment
    29                 for library DGS 800-233                 1,650,000
    30         (F)  New Kensington Campus
    19970S0188B1336                 - 57 -

     1             (I)  Addition to academic building DGS
     2                 800-212                                   260,000
     3         (G)  Wilkes-Barre Campus
     4             (I)  Technology center DGS 800-218            200,000
     5     (ii)  University of Pittsburgh
     6         (A)  Original furnishings and equipment for
     7             Smith Hall DGS 1103-58 - Greensburg
     8             Campus                                         45,000
     9         (B)  Additional funds for
    10             Classroom/Administration Building DGS
    11             1103-53 - Johnstown Campus                    525,000
    12         (C)  Original furnishings and equipment for
    13             Engineering and Science Center -
    14             Johnstown Campus DGS 1103-59                   76,000
    15         (D)  Additional funds for
    16             Convocation/Events Center DGS 1103-48 -
    17             Oakland Campus                              1,458,000
    18         (E)  Additional funds for Multi-Purpose
    19             Academic Complex DGS 1103-40 - Oakland
    20             Campus                                      2,093,000
    21         (F)  Additional funds for Hillman Library
    22             Addition DGS 1103-55 - Oakland Campus         316,000
    23         (G)  Original furnishings and equipment for
    24             Science Building DGS 1103-54 -
    25             Titusville Campus                             195,000
    26         (H)  Original furniture and equipment for
    27             Sports Center expansion - Bradford
    28             Campus                                      2,300,000
    29         (I)  Original furniture and equipment for
    30             Communications, Arts and Technology
    19970S0188B1336                 - 58 -

     1             Building - Bradford Campus                  2,200,000
     2         (J)  Additional original furniture and
     3             equipment for Bellefield Annex
     4             renovation - Oakland Campus                   199,000
     5     (iii)  Northwest Pennsylvania Technical
     6         Institute
     7         (A)  Original furniture and equipment for
     8             Erie County public learning network         1,000,000
     9     (iv)  Thaddeus Stevens State School of
    10         Technology
    11         (A)  Original furniture and equipment for
    12             multi-purpose activities center and
    13             trade-technical laboratory                    750,000
    14  (4)  DEPARTMENT OF GENERAL SERVICES                     $449,000  <--
    15     (I)  DAVID L. LAWRENCE CONVENTION CENTER
    16         (A)  MEETING ROOM FURNISHINGS, DECORATION
    17             EQUIPMENT, COMPUTER EQUIPMENT, WINDOW
    18             TREATMENTS AND SOUND SYSTEM
    19             IMPROVEMENTS                                  449,000
    20  (4)  Historical and Museum Commission                   $610,000  <--
    21  (5)  HISTORICAL AND MUSEUM COMMISSION                 $3,310,000  <--
    22     (i)  Railroad Museum of Pennsylvania
    23         (A)  Original furniture and equipment for
    24             locomotive shed DGS 980-3                     220,000
    25     (ii)  Somerset Historical Center
    26         (A)  Original furniture and equipment for
    27             expansion of the visitor center DGS
    28             990-2                                         150,000
    29     (iii)  State Records Center
    30         (A)  Original furniture and equipment for
    19970S0188B1336                 - 59 -

     1             addition to the State Records Center
     2             DGS 948-38                                    240,000
     3     (IV)  FORT PITT MUSEUM, POINT STATE PARK,                      <--
     4         ALLEGHENY COUNTY. ADDITIONAL FUNDS FOR DGS
     5         989-2. REPLACE AND RECONSTRUCT ROOFING
     6         SYSTEM AND RESTORE INTERIOR FINISHES TO
     7         PROVIDE FOR: REMOVAL OF EXISTING FAILED
     8         ROOFING WITH SOD COVER AND CRIBBING, NEW
     9         ROOF STRUCTURE THAT WILL PROHIBIT TRESPASS
    10         FROM FORT PITT BRIDGE APPROACH, WITH
    11         APPURTENANT STRUCTURE AND FINISHES,
    12         RESTORE, REPAIR OR PROVIDE NEW EXTERIOR AND
    13         INTERIOR FINISHES                               2,000,000
    14             (BASE PROJECT ALLOCATION - $1,600,000)
    15             (DESIGN AND CONTINGENCIES - $400,000)
    16     (V)  PENNSBURG VISITORS CENTER
    17         (A)  ORIGINAL FURNITURE AND EQUIPMENT             300,000
    18     (VI)  LANDIS VALLEY MUSEUM
    19         (A)  ORIGINAL FURNITURE AND EQUIPMENT FOR
    20             THE LANDIS VALLEY STORAGE BUILDING AND
    21             THE HANDS-ON-HOUSE MUSEUM                     400,000
    22  (5) (6)  Department of Military and Veterans                      <--
    23     Affairs                                            $1,093,000
    24     (i)  Southwestern Veterans Home Allegheny
    25         County
    26         (A)  Original furniture and equipment for
    27             the Southwestern Veterans Home DGS 967-
    28             50                                          1,093,000
    29  (6) (7)  Department of Public Welfare                   $926,000  <--
    30     (i)  Youth Detention Facility at Cresson
    19970S0188B1336                 - 60 -

     1         (A)  Original furniture and equipment for
     2             maximum security youth detention
     3             facility for western Pennsylvania DGS
     4             587-9                                         463,000
     5     (ii)  Youth Detention Facility at South
     6         Mountain
     7         (A)  Original furniture and equipment for
     8             maximum security youth detention
     9             facility for eastern Pennsylvania DGS
    10             557-13                                        463,000
    11  (7) (8)  State System of Higher Education            $30,937,000  <--
    12     (i)  Bloomsburg State University
    13         (A)  Original furniture and equipment for
    14             Centennial Gymnasium DGS 401-51             1,042,000
    15         (B)  Original furniture and equipment for
    16             Navy Hall                                     429,000
    17         (C)  Original furniture and equipment for
    18             Hartline Science Center                       952,000
    19     (ii)  California State University
    20         (A)  Original furniture and equipment for
    21             Dixon Hall DGS 402-51                         684,000
    22         (B)  Original furniture and equipment for
    23             Adamson Stadium DGS 402-52                    140,000
    24         (C)  Original furniture and equipment for
    25             World Culture Building DGS 402-53             613,000
    26         (D)  Original furniture and equipment for
    27             Noss Hall                                     337,000
    28         (E)  Original furniture and equipment for
    29             Steele Auditorium                             572,000
    30     (iii)  Clarion State University
    19970S0188B1336                 - 61 -

     1         (A)  Original furniture and equipment for
     2             Carlson Library                             2,048,000
     3     (iv)  East Stroudsburg State University
     4         (A)  Original furniture and equipment for
     5             Zimbar Gymnasium DGS 405-52                   407,000
     6         (B)  Original furniture and equipment for
     7             Rosenkrans Hall                               386,000
     8         (C)  Original furniture and equipment for
     9             Eiler-Martin Stadium                          323,000
    10     (v)  Edinboro State University
    11         (A)  Original furniture and equipment for
    12             Loveland Hall DGS 406-47                       30,000
    13         (B)  Original furniture and equipment for
    14             Cooper Science DGS 406-51                     234,000
    15         (C)  Original furniture and equipment for
    16             Heather Hall                                  227,000
    17         (D)  Original furniture and equipment for
    18             Butterfield Hall                              494,000
    19         (E)  Original furniture and equipment for
    20             Memorial Auditorium                           250,000
    21     (vi)  Indiana University
    22         (A)  Original furniture and equipment for
    23             Clark Hall DGS 407-64                         333,000
    24         (B)  Original furniture and equipment for
    25             Uhler Hall DGS 407-65                         504,000
    26         (C)  Original furniture and equipment for
    27             John Sutton Hall - Phase I                    738,000
    28         (D)  Original furniture and equipment for
    29             Stabley Library                               463,000
    30         (E)  Original furniture and equipment for
    19970S0188B1336                 - 62 -

     1             Cogswell Hall                                 889,000
     2         (F)  Original furniture and equipment for
     3             Keith Hall                                    706,000
     4     (vii)  Kutztown State University
     5         (A)  Original furniture and equipment for
     6             Athletic Facility DGS 408-54                  280,000
     7         (B)  Original furniture and equipment for
     8             Science Buildings                           1,866,000
     9         (C)  Original furniture and equipment for
    10             Graduate Center                               360,000
    11     (viii)  Lock Haven State University
    12         (A)  Original furniture and equipment for
    13             conversion of Boiler Plant to
    14             Classrooms DGS 409-55                         335,000
    15         (B)  Original furniture and equipment for
    16             Clearfield Campus DGS 409-56                  500,000
    17         (C)  Original furniture and equipment for
    18             Rogers Gym DGS 409-57                         311,000
    19         (D)  Original furniture and equipment for
    20             Court House Annex DGS 409-58                  440,000
    21     (ix)  Mansfield State University
    22         (A)  Original furniture and equipment for
    23             renovation of Gymnasium to Facility for
    24             Instruction DGS 401-51                        499,000
    25         (B)  Original furniture and equipment for
    26             Belknap/Retan, DGS 410-49                     768,000
    27     (x)  Millersville State University
    28         (A)  Original furniture and equipment for
    29             McComsey Hall                                 766,000
    30         (B)  Original furniture and equipment for
    19970S0188B1336                 - 63 -

     1             Osburn Hall                                   420,000
     2         (C)  Original furniture and equipment for
     3             Stayer Hall                                   684,000
     4         (D)  Original furniture and equipment for
     5             Lyle Hall                                     268,000
     6         (E)  Original furniture and equipment for
     7             Roddy Science Center                          704,000
     8         (F)  Original furniture and equipment for
     9             Gerhart Hall                                   24,000
    10     (xi)  Shippensburg State University
    11         (A)  Original furniture and equipment for
    12             Franklin Science Center                     1,742,000
    13         (B)  Original furniture and equipment for
    14             Shippen Hall                                1,581,000
    15         (C)  Original furniture and equipment for
    16             Rowland and Shearer Halls                     517,000
    17         (D)  Original furniture and equipment for
    18             Huber Arts and Counselor Education
    19             Building                                      280,000
    20     (xii)  Slippery Rock State University
    21         (A)  Original furniture and equipment for
    22             Vincent Science Building                    1,641,000
    23         (B)  Original furniture and equipment for
    24             Health Professionals Building               1,479,000
    25     (xiii)  West Chester State University
    26         (A)  Original furniture and equipment for
    27             Swope Hall DGS 414-62                         672,000
    28         (B)  Original furniture and equipment for
    29             Schmucker Science - Phase III               1,584,000
    30         (C)  Original furniture and equipment for
    19970S0188B1336                 - 64 -

     1             Francis Harvey Green Building                 415,000
     2  (9)  DEPARTMENT OF TRANSPORTATION                       $564,000  <--
     3     (I)  VENANGO COUNTY DISTRICT 1-0 OFFICE
     4         BUILDING
     5         (A)  ORIGINAL FURNISHINGS AND EQUIPMENT FOR
     6             NEW DISTRICT 1-0 OFFICE BUILDING IN OIL
     7             CITY, VENANGO COUNTY                          564,000
     8  Section 5.  Itemization of transportation assistance projects.
     9     (a)  Mass transit.--Additional capital projects in the
    10  category of transportation assistance projects for mass transit
    11  in which an interest is to be acquired or constructed by the
    12  Department of Transportation, its successors or assigns, and to
    13  be financed by the incurring of debt, are hereby itemized,
    14  together with their estimated financial costs, as follows:
    15                                                           Total
    16                                                          Project
    17             Project                                    Allocation
    18  (1)  AREA TRANSPORTATION AUTHORITY OF NORTH                       <--
    19     CENTRAL PENNSYLVANIA
    20     (I)  PURCHASE OF HEAVY-DUTY REPLACEMENT
    21         VEHICLES AND ACCESSIBLE REPLACEMENT VANS          480,000
    22     (II)  FOR THE COMPLETION OF THE CONSTRUCTION OF
    23         PASSENGER AND BUS STORAGE FACILITIES              376,000
    24     (III)  COMPLETION OF A REGIONAL GIS/ITS SYSTEM        974,000
    25  (1) (2)  Beaver County Transit Authority                          <--
    26     (i)  Purchase of buses and related equipment          185,000
    27     (ii)  Deployment of Intelligent Transportation
    28         System                                            300,000
    29  (2) (3)  Berks Area Reading Transportation                        <--
    30     Authority
    19970S0188B1336                 - 65 -

     1     (i)  Phase II - Downtown Transportation Center        867,000
     2  (2.1) (4)  Cambria County Transit Authority                       <--
     3     (i)  Rehabilitate fuel storage and dispensing
     4         system                                            196,000
     5  (3) (5)  Capitol Area Transit                                     <--
     6     (i)  Construction of the West Shore Transfer
     7         Center                                            133,000
     8     (ii)  Purchase of two 28-passenger trolley
     9         buses                                              93,000
    10     (iii)  Infrastructure improvements, vehicle
    11         acquisition and planning for a
    12         demonstration project for the Harrisburg
    13         Transportation Center to Carlisle rail
    14         corridor                                        1,000,000
    15     (IV)  ACQUISITION OF RAILS ROUTES, FACILITIES                  <--
    16         AND/OR TRACKAGE RIGHTS FOR COMMUTER RAIL
    17         OPERATIONS IN THE CAPITOL REGION               15,000,000
    18  (4) (6)  Centre Area Transportation Authority                     <--
    19     (i)  Purchase of service vehicles and automatic
    20         vehicle locator system                            120,000
    21     (ii)  Purchase of office and maintenance
    22         equipment including spare parts                    45,000
    23     (iii)  Purchase of small transit buses and
    24         spare parts                                        50,000
    25     (iv)  Purchase of ten replacement buses               500,000
    26  (5) (7)  Chambersburg Transit Authority                           <--
    27     (i)  Construction or purchase of
    28         administrative, maintenance and storage
    29         facility                                           84,000
    30  (6) (8)  City of Philadelphia                                     <--
    19970S0188B1336                 - 66 -

     1     (i)  Locust Street Concourse Improvements -
     2         Construction of Locust Street Concourse
     3         project in the public concourse area under
     4         Locust Street between 12th and 16th
     5         Streets, adjacent to the PATCO Lindenwood
     6         High Speed Line and the 12th and 13th
     7         Streets and 15th and 16th Streets stations      1,000,000
     8     (ii)  Erie Avenue Subway Station Intermodal
     9         Improvements                                      308,000
    10     (iii)  Renovations at the Erie Station on Broad
    11         Street subway                                     317,000
    12     (IV)  RECONSTRUCTION OF CHESTNUT STREET TRANSIT                <--
    13         WAY                                             4,237,000
    14     (V)  PARKING AND OTHER IMPROVEMENTS FOR READING
    15         TERMINAL                                          300,000
    16  (6.1) (9)  Delaware River Port Authority                          <--
    17     (i)  Purchase and installation of equipment for
    18         Front Street Substation for traction power         92,000
    19  (7) (10)  Erie Metropolitan Transit Authority                     <--
    20     (i)  Construction of a park and ride lot in
    21         Northwest Erie                                    167,000
    22     (ii)  Purchase of replacement buses and related
    23         equipment                                         285,000
    24     (iii)  Purchase of four replacement buses,
    25         spare parts and maintenance items                 182,000
    26     (iv)  Purchase of six minibuses                        49,000
    27     (V)  INTERMODAL COMPLEX (BUS TRANSFER STATION)      1,700,000  <--
    28  (7.1) (11)  Indiana County Transit Authority                      <--
    29     (i)  Purchase of replacement transit buses            120,000
    30  (7.2) (12)  Lackawanna County Transit System                      <--
    19970S0188B1336                 - 67 -

     1     (i)  Purchase of 13 buses and maintenance             488,000
     2  (8) (13)  Lehigh and Northampton Transportation                   <--
     3     Authority
     4     (i)  Replacement of 25 buses                        1,084,000
     5  (8.1) (14)  Mid Mon Valley Transit Authority                      <--
     6     (i)  Purchase of five suburban transit coaches        233,000
     7  (9) (15)  Port Authority of Allegheny County                      <--
     8     (i)  Fiscal Year 1995-1996 Section 9 Program of                <--
     9         Projects                                        4,500,000
    10     (ii)  Fiscal Year 1995-1996 fixed guideway
    11         modernization projects                          3,500,000
    12     (iii)  Environmental cleanup                        2,000,000
    13     (iv)  Spine Line                                   43,500,000
    14     (v)  Airport Busway                                18,600,000
    15     (vi)  Fiscal Year 1996-1997 Section 9 Program
    16         of Projects                                     4,500,000
    17     (vii)  Fiscal Year 1996-1997 Vehicle Overhaul       5,000,000
    18     (viii)  Fiscal Year 1997-1998 Vehicle Overhaul     11,000,000
    19     (ix)   Fiscal Year 1996-1997 Fixed Guideway
    20         Modernization                                   3,500,000
    21     (x)  Fiscal Year 1996-1997 Title I ISTEA
    22         Flexible Funds - Busway Improvements              167,000
    23     (I)  FISCAL YEAR 1995-1996 SECTION 9 PROGRAM OF                <--
    24         PROJECTS                                        4,500,000
    25     (II)  FISCAL YEAR 1996-1997 SECTION 9 PROGRAM
    26         OF PROJECTS                                     4,500,000
    27     (III)  FISCAL YEAR 1997-1998 SECTION 9 PROGRAM
    28         OF PROJECTS                                     4,500,000
    29     (IV)  FISCAL YEAR 1998-1999 SECTION 9 PROGRAM
    30         OF PROJECTS                                     4,500,000
    19970S0188B1336                 - 68 -

     1     (V)  FISCAL YEAR 1996-1997 VEHICLE OVERHAUL         6,000,000
     2     (VI)  FISCAL YEAR 1997-1998 VEHICLE OVERHAUL        5,000,000
     3     (VII)  FISCAL YEAR 1998-1999 VEHICLE OVERHAUL       5,000,000
     4     (VIII)  FISCAL YEAR 1995-1996 FIXED GUIDEWAY
     5         MODERNIZATION                                   3,500,000
     6     (IX)  FISCAL YEAR 1996-1997 FIXED GUIDEWAY
     7         MODERNIZATION                                   3,500,000
     8     (X)  FISCAL YEAR 1997-1998 FIXED GUIDEWAY
     9         MODERNIZATION                                   3,500,000
    10     (XI)  FISCAL YEAR 1998-1999 FIXED GUIDEWAY
    11         MODERNIZATION                                   3,500,000
    12     (XII)  FISCAL YEAR 1997-1998 FEDERAL FLEX           1,323,000
    13     (XIII)  FISCAL YEAR 1998-1999 FEDERAL FLEX          1,323,000
    14     (XIV)  FISCAL YEAR 1997-1998 INFRASTRUCTURE
    15         SAFETY RENEWAL PROGRAM (ISRP)                  13,700,000
    16     (XV)  FISCAL YEAR 1998-1999 INFRASTRUCTURE
    17         SAFETY RENEWAL PROGRAM (ISRP)                  13,700,000
    18     (XVI)  FISCAL YEAR 1996-1997 TITLE I ISTEA
    19         FLEXIBLE FUNDS                                    117,000
    20     (XVII)  ENVIRONMENTAL CLEANUP                       2,000,000
    21     (XVIII)  STAGE II LIGHT RAIL TRANSIT
    22         RECONSTRUCTION                                 11,333,000
    23     (XIX)  BUS PROCUREMENT                             10,000,000
    24     (XX)  NORTH SHORE/CENTRAL BUSINESS DISTRICT
    25         TRANSPORTATION IMPROVEMENT PROJECT             12,500,000
    26     (XXI)  STAGE II LIGHT RAIL TRANSIT PROGRAM         13,499,000
    27     (XXII)  FISCAL YEAR 1995-1996 TITLE I ISTEA
    28         FLEXIBLE FUNDS - PAT BUSWAY IMPROVEMENTS        1,667,000
    29     (XXIII)  FISCAL YEAR 1995-1996 TITLE I ISTEA
    30         FLEXIBLE FUNDS STAGE II LIGHT RAIL TRANSIT
    19970S0188B1336                 - 69 -

     1         PROGRAM                                         3,333,000
     2     (XXIV)  EAST BUSWAY EXTENSION                      43,500,000
     3  (10) (16)  Southeastern Pennsylvania                              <--
     4     Transportation Authority
     5     (i)  Fiscal Year 1995-1996 Infrastructure,
     6         Safety and Renewal Program                      5,000,000  <--
     7     (ii)  Environmental cleanup                         5,000,000
     8         SAFETY AND RENEWAL PROGRAM                     25,000,000  <--
     9     (II)  FISCAL YEAR 1995-1996 ENVIRONMENTAL
    10         CLEANUP                                         5,000,000
    11     (iii)  Fiscal Year 1995-1996 Vehicle Overhaul
    12         Program                                        40,000,000
    13     (iv)  Fiscal Year 1995 Section 9 Program            9,521,000
    14     (v)  Frankford Elevated Reconstruction Projects
    15         - Fiscal Year 1995 Requirement                  8,334,000
    16     (vi)  Fiscal Year 1995 Section 3 Fixed Guideway
    17         Program                                         5,469,000
    18     (vii)  Fiscal Year 1995 Section 9 Approved
    19         Federal Highway Flexed Projects                16,784,000
    20     (viii)  Section 3 Approved Highway Flexing          4,098,000  <--
    21     (VIII)  FRANKFORD TRANSPORTATION CENTER                        <--
    22         CONSTRUCTION - FISCAL YEARS 1994 THROUGH
    23         1997 REQUIREMENT                                4,098,000
    24     (ix)  Fiscal Year 1995 Section 3 Bus Purchase       1,250,000
    25     (x)  Chester Transportation Center                  1,250,000
    26     (xi)  Cross County Metro - Major Investment
    27         Study                                             251,000
    28     (xii)  Regional Rail Traction Power/Circuit
    29         Breaker                                           146,000
    30     (xiii)  Fiscal Year 1996-1997 Vehicle Overhaul
    19970S0188B1336                 - 70 -

     1         Program                                        45,000,000
     2     (xiv)  Fiscal Year 1996-1997 Infrastructure
     3         Safety and Renewal Program                     25,000,000
     4     (xv)  Fiscal Year 1996-1997 Environmental
     5         Cleanup                                         5,000,000
     6     (xvi)  Frankford Elevated Reconstruction
     7         Program - Fiscal Year 1996 Section 3            8,334,000
     8     (xvii)  Fiscal Year 1996 Section 9 Program of
     9         Projects                                        9,316,000
    10     (xviii)  Fiscal Year 1996 Section 3 Program         4,528,000
    11     (xix)  Fiscal Year 1996 Section 3 Bus
    12         Acquisition                                     1,551,000
    13     (xx)  Fiscal Year 1996 Section 3 Alternative
    14         Fuel Buses                                        311,000
    15     (xxi)  North Philadelphia Transportation
    16         Center                                            621,000
    17     (xxii)  Federal Highway Flexible Funding
    18         program, 1996                                     515,000
    19     (xxiii)  Development of rail traction power
    20         distribution                                      521,000  <--
    21         DISTRIBUTION                                      604,000  <--
    22     (xxiv)  Completion of Frankford Elevated
    23         reconstruction final segment including
    24         renovating five stations, 1997 Section 3        8,333,000
    25     (xxv)  Acquisition of buses, automatic train                   <--
    26         controls, underground storage tanks, 1997
    27         Section 9                                       8,833,000
    28     (xxvi)  Infrastructure for Market/Frankford
    29         Line, Broad Street signal system and
    30         station accessibility, 1997 Section 3           5,666,000
    19970S0188B1336                 - 71 -

     1     (xxvii)  Purchase of 200 advanced design
     2         accessible buses, 1997 Section 3                3,333,000
     3     (XXV)  ACQUISITION OF BUSES, PURCHASE OF                       <--
     4         ROLLING STOCK COMPONENTS AND EQUIPMENT,
     5         PURCHASE OF TOOLS AND EQUIPMENT AND
     6         UNDERGROUND STORAGE TANK
     7         REMOVAL/MODIFICATIONS - FISCAL YEAR 1997
     8         SECTION 9                                       8,833,000
     9     (XXVI)  IMPROVEMENT FOR MARKET/FRANKFORD LINE,
    10         BROAD STREET SUBWAY SIGNAL SYSTEM AND
    11         STATION ACCESSIBILITY, 1997 SECTION 3           5,526,000
    12     (XXVII)  PURCHASE OF ADVANCED DESIGN ACCESSIBLE
    13         BUSES, 1997 SECTION 3                           1,664,000
    14     (xxviii)  Purchase of alternative fuels buses
    15         for routes in Bucks, Chester and Montgomery
    16         Counties, 1997 Section 3                        1,667,000  <--
    17         COUNTIES, 1997 SECTION 3                          827,000  <--
    18     (xxix)  Continued construction of
    19         transportation center in North
    20         Philadelphia                                    1,000,000  <--
    21     (xxx)  Continued reconstruction of the
    22         Frankford Elevated Line, 1996 Section 3
    23         Program, specifically station
    24         accessibility, fleet renewal, reconstruct
    25         Market elevated                                 4,528,000
    26         PHILADELPHIA                                      207,000  <--
    27     (XXX)  FISCAL YEAR 1996 NORTH PHILADELPHIA -
    28         LIVABLE COMMUNITIES                                11,000
    29     (XXXI)  FISCAL YEAR 1997-1998 VEHICLE OVERHAUL     15,200,000
    30     (XXXII)  FISCAL YEAR 1997-1998 INFRASTRUCTURE
    19970S0188B1336                 - 72 -

     1         SAFETY RENEWAL                                 20,000,000
     2     (XXXIII)  FISCAL YEAR 1998 FEDERAL FORMULA
     3         GRANT PROGRAM                                  25,334,000
     4     (XXXIV)  FRANKFORD TRANSPORTATION CENTER -
     5         CONSTRUCTION                                    5,000,000
     6     (XXXV)  PAOLI TRANSPORTATION CENTER -
     7         ENGINEERING, LAND ACQUISITION AND
     8         CONSTRUCTION                                      333,000
     9     (XXXVI)  SCHUYLKILL VALLEY METRO - MAJOR
    10         INVESTMENT, ENVIRONMENTAL IMPACT STUDIES
    11         AND PRELIMINARY ENGINEERING                       333,000
    12     (XXXVII)  FISCAL YEAR 1998 FLEXIBLE HIGHWAY
    13         ADMINISTRATION FUNDING - I-95
    14         TRANSPORTATION MITIGATION PROGRAM, REGIONAL
    15         TRANSIT STOP SIGNAGE (CMAQ), FRONTIER
    16         ALTERNATIVE FUEL PROJECT (CMAQ), BUS
    17         PURCHASE PROGRAM AND SMALL BUS ACQUISITION
    18         PROGRAM                                         7,977,000
    19     (XXXVIII)  MIDVALE BUS GARAGE - CONSTRUCTION        1,814,000
    20     (XXXIX)  FRA SUBURBAN TO 30TH STREET STATION
    21         BRIDGES AND CATENARY/OVERBROOK TRAIN
    22         STATION RENOVATION                              1,430,000
    23     (XL)  FISCAL YEAR 1997 FHWA FLEXING                   551,000
    24  (11) (17)  Shenango Valley Shuttle Service                        <--
    25     (i)  Construction of a new transit center and
    26         park and ride facility                            100,000
    27     (ii)  Purchase of two transit buses                    67,000
    28  (12) (18)  Red Rose Transportation Authority                      <--
    29     (i)  Construction of a rail station along
    30         Amtrak Line in eastern Lancaster County            68,000  <--
    19970S0188B1336                 - 73 -

     1         AMTRAK LINE IN EASTERN LANCASTER COUNTY           410,000  <--
     2     (II)  PHASE II, EXTEND STRASBURG RAILROAD TRACK
     3         FROM LEAMAN PLACE TO RAIL STATION SITE          3,615,000
     4     (III)  ADA COMPLIANCE PROJECT FOR LANCASTER
     5         CITY TRAIN STATION                                600,000
     6     (IV)  DOWNTOWN LANCASTER TRANSFER TERMINAL          5,300,000
     7  (13) (19)  Williamsport Bureau of Transportation                  <--
     8     (i)  Construction of a central business
     9         district transportation center                    683,000
    10  (13.1) (20)  York Area Transportation Authority                   <--
    11     (i)  Construction of a bus transfer center            455,000
    12  (14) (21)  Class 3, Class 4 and Community Public                  <--
    13     Transportation Systems
    14     (i)  Projects, including, but not limited to,
    15         purchase of vehicles, vehicle overhaul,
    16         purchase of facilities, facility
    17         renovations, other capital equipment and
    18         associated capital items for Fiscal Year
    19         1996-1997                                       7,500,000
    20  (15) (22)  Department of Transportation                           <--
    21     (i)  Purchase of rail passenger equipment and
    22         rail infrastructure improvements                2,600,000
    23     (ii)  Rehabilitation of rail stations along
    24         Keystone Corridor                               1,500,000
    25     (b)  Rural and intercity rail.--Additional capital projects
    26  in the category of transportation assistance projects for rural
    27  and intercity rail service projects to be constructed or with
    28  respect to which an interest is to be acquired by the Department
    29  of Transportation, its successors or assigns, and to be financed
    30  by the incurring of debt, are hereby itemized, together with
    19970S0188B1336                 - 74 -

     1  their respective estimated financial costs, as follows:
     2                                                           Total
     3                                                          Project
     4             Project                                    Allocation
     5  (1)  Allegheny County
     6     (i)  Purchase of the Wheeling and Lake Erie                    <--
     7         Railway                                        12,000,000
     8     (ii)  Construction of railroad connection to
     9         interchange Wheeling and Lake Erie traffic
    10         to Pittsburgh Industrial Railroad to
    11         reestablish CSXT interchange South of
    12         Bridgeville between Milepost 57 and
    13         Milepost 61                                     2,500,000
    14     (iii) (I)  Wheeling and Lake Erie Railroad line                <--
    15         rehabilitation                                  1,500,000
    16     (iv) (II)  Purchase of a portion of West End                   <--
    17         Branch of Wheeling Lake Erie Railway Right-
    18         of-way to accommodate West End Circle
    19         Project of PennDOT and construction of
    20         railroad connection to interchange Wheeling
    21         and Lake Erie traffic to Pittsburgh
    22         Industrial Railroad to reestablish CSXT
    23         interchange south of Bridgeville between
    24         Milepost 57 and Milepost 61                    12,500,000
    25     (v)  Purchase of West End Branch of Wheeling                   <--
    26         Lake Erie Railway from Steuben Street to
    27         Wabash Tunnel to accommodate Banksville
    28         Interchange at 1-279 and the development of
    29         HOV corridor                                    6,500,000
    30     (vi) (III)  Purchase Wheeling and Lake Erie                    <--
    19970S0188B1336                 - 75 -

     1         Railway main right-of-way from Rook Yard
     2         (Milepost 56 to Longview Milepost 46) to
     3         create two new transportation corridors to
     4         downtown Pittsburgh                            18,000,000
     5     (vii) (IV)  Wheeling & Lake Erie Railway                       <--
     6         Company
     7         (A)  Replacement of deteriorated crossties
     8             on former P & WV rail line that runs
     9             for 38.6 miles between Pierce and
    10             Connellsville to allow for intermodal
    11             traffic or expected volume of iron ore
    12             trains                                        800,000
    13             (Base Project Allocation - $720,000)
    14             (Design and Contingencies - $80,000)
    15     (viii) (V)  Development of intermodal                          <--
    16         transportation and distribution facility in
    17         Leetsdale                                       1,250,000
    18     (ix) (VI)  Pittsburgh, Allegheny and McKees                    <--
    19         Rocks Railroad
    20         (A)  Maintenance of infrastructure along
    21             trackage                                      300,000
    22  (2)  Allegheny and Washington Counties
    23     (i)  Pittsburgh Industrial Railroad
    24         (A)  Maintenance of infrastructure at
    25             various points along trackage from
    26             Youngwood to Fairchance                       300,000
    27  (3)  Allegheny, Westmoreland, Washington and
    28     Fayette
    29     (i)  Former Pittsburgh West Virginia Line
    30         (A)  Replacement of deteriorated crossties
    19970S0188B1336                 - 76 -

     1             on 38.6 miles of trackage                     600,000
     2  (4)  Beaver County
     3     (i)  Ohio and Pennsylvania Railroad
     4         (A)  Rehabilitation of seven miles of rail
     5             line                                          450,000
     6     (II)  PENN POWER                                               <--
     7         (A)  REHABILITATION OF SPECIFIC SECTIONS OF
     8             BRANCH LINE FROM NOVA CHEMICAL TO
     9             DUQUESNE NUCLEAR POWER IN SHIPPINGPORT
    10             BOROUGH                                     1,474,000
    11     (III)  NATIONAL GYPSUM
    12         (A)  BUILD AN INDUSTRIAL RAIL SPUR WITH ALL
    13             APPROPRIATE SIGNALS INTO NEW PLANT FROM
    14             BRANCH LINE                                   815,000
    15     (IV)  BEAVER COUNTY CORPORATION FOR ECONOMIC
    16         DEVELOPMENT MIDA RAIL PROJECT                     250,000
    17  (5) Berks County
    18     (i)  Reading, Blue Mountain and Northern
    19         Railroad
    20         (A)  Construction of connection from USRA
    21             Line No. 197b to Reading & Northern
    22             Railroad at Temple                            800,000
    23  (6)  Blair County
    24     (i)  Morrison's Cove Railroad
    25         (A)  Replace three sections of existing
    26             track with heavy rail for approximately
    27             3.0 miles to handle existing traffic on
    28             the Morrison's Cove Railroad and the
    29             Martinsburg Branch; replace track
    30             switches; upgrade three grade
    19970S0188B1336                 - 77 -

     1             crossings                                     396,000
     2  (7)  Bucks County
     3     (i)  Bristol Industrial Park
     4         (A)  Construction of industrial terminal
     5             railway extension                             125,000
     6     (ii)  USX Fairless Industrial Park
     7         (A)  Upgrade of interchange points                600,000
     8  (8)  Butler County
     9     (i)  Buffalo and Pittsburgh Railroad
    10         (A)  Construction of new rail side track
    11             and four new turnouts                         200,000
    12         (B)  Johnsonburg Bypass rail connection
    13             between Buffalo and Pittsburgh Railroad
    14             and the Allegheny and Eastern Railroad      3,200,000
    15         (C)  Mainline from Punxsutawney to Falls
    16             Creek                                       1,000,000
    17     (ii)  Genesee and Wyoming Railroad                             <--
    18         (A)  Butler to Bruin                            1,800,000
    19  (9)  CAMBRIA COUNTY                                               <--
    20     (I)  C.B. & L RAILWAY
    21         (A)  REDEVELOPMENT AUTHORITY OF JOHNSTOWN
    22             TO PURCHASE AND UPGRADE                     4,000,000
    23  (9) (10)  Carbon County                                           <--
    24     (i)  Chestnut Ridge Railway
    25         (A)  Rehabilitation of yard trackage at the
    26             Zinc Corporation facility                     248,000
    27  (9.1) (11)  Carbon and Luzerne Counties                           <--
    28     (i)  Rehabilitation of the Reading, Blue
    29         Mountain and Northern Railroad between
    30         Dupont and White Haven including
    19970S0188B1336                 - 78 -

     1         replacement of 19 miles of welded rail,
     2         replacement of deteriorating ties,
     3         resurface railbed, renew road crossings,
     4         adjust track alignment and other
     5         miscellaneous rehabilitation on both tracks
     6         to a minimum FRA Class II Track Standards       4,500,000
     7     (ii)  Rehabilitation of the Reading, Blue
     8         Mountain and Northern Railroad's Track 1
     9         between Lehighton and M & H Junction to FRA
    10         Class 1 Track Standards and Track 2 between
    11         Laurel Run and Dupont to FRA Class I Track
    12         Standards                                         360,000
    13  (10) (12)  Carbon, Luzerne, Lackawanna and Wyoming                <--
    14     (i)  Lehigh Middle Cluster
    15         (A)  Rehabilitation of 93 miles of track          450,000
    16  (11) (13)  Carbon and Schuylkill Counties                         <--
    17     (i)  Rehabilitation of railroad tracks
    18         connecting the Boroughs of Lansford and
    19         Tamaqua                                           700,000
    20  (12) (14)  Centre County                                          <--
    21     (i)  SEDA-COG Whiterock Quarry track
    22         (A)  Track rehabilitation and construction      1,400,000
    23  (13) (15)  Chester County                                         <--
    24     (i)  Brandywine Valley Railroad
    25         (A)  Elevate track and construct retaining                 <--
    26             wall to prevent continual washouts from
    27             Brandywine Creek in South Coatesville         405,000
    28         (A)  HERITAGE RAIL LINK, REHABILITATION OF                 <--
    29             RAILROAD FROM COATESVILLE TO MODENA            75,000
    30     (II)  DELAWARE VALLEY RAILWAY
    19970S0188B1336                 - 79 -

     1         (A)  HERITAGE RAIL LINK, CONSTRUCTION OF
     2             MENDENHALL PASSING TRACK                       80,000
     3         (B)  HERITAGE RAIL LINK, RECONSTRUCTION OF
     4             RAILWAY BETWEEN MENDENHALL AND KENNETT
     5             SQUARE INCLUDING KENNETT SQUARE PASSING
     6             TRACK                                         128,000
     7         (C)  HERITAGE RAIL LINK RECONSTRUCTION OF
     8             POCOPSON PASSING TRACK                         33,000
     9         (D)  HERITAGE RAIL LINK, RECONSTRUCTION OF
    10             RAILWAY BETWEEN BRANDYWINE MUSEUM AND
    11             CHADDS FORD                                    30,000
    12     (III)  HERITAGE RAIL LINK
    13         (A)  REHABILITATION OF STATIONS AND PARKING
    14             AREAS IN COATESVILLE, NORTHBROOK,
    15             CHADDS FORD, MENDENHALL AND KENNETT
    16             SQUARE                                        155,000
    17     (IV)  HERITAGE TRAIN THROUGH COATESVILLE,
    18         UTILIZING TRACKAGE THROUGH LUKENS STEEL
    19         CORPORATION INCLUDING CAPITAL IMPROVEMENTS
    20         AND OPERATIONS                                  1,232,000
    21  (14) (16)  Clinton, Centre and Blair Counties                     <--
    22     (i)  SEDA-COG Joint Rail Authority
    23         (A)  Nittany and Bald Eagle Railroad
    24             Rehabilitation                              3,000,000
    25         (B)  Commonwealth supported rail welding
    26             project                                     3,000,000
    27  (15) (17)  Dauphin County                                         <--
    28     (i)  Replacement of rail bridge over a canal on
    29         Front Street in Borough of Steelton               188,000
    30  (16) (18)  Elk County                                             <--
    19970S0188B1336                 - 80 -

     1     (i)  Genesee and Wyoming BUFFALO AND PITTSBURGH                <--
     2         Railroad
     3         (A)  Johnsonburg to New York State Line         3,200,000
     4  (17) (19)  Erie and Crawford Counties                             <--
     5     (i)  Allegheny and Eastern Railroad, Inc.                      <--
     6         (A)  From Milepost 8 to Milepost 19,
     7             rehabilitation and upgrade of 11 miles
     8             of Allegheny and Eastern Railroad used
     9             for traffic moving to or from Conrail
    10             interchange at Erie. Includes
    11             rehabilitation of rails, new ties and
    12             other roadbed improvements                    275,000
    13     (ii) (I)  Northwestern Pennsylvania Railroad                   <--
    14         (A)  Upgrade of rail line to Federal
    15             Railway Administration Class II
    16             condition                                     250,000
    17  (18) (20)  Fayette County                                         <--
    18     (i)  Completion of CSX rail acquisition in
    19         Fayette County                                  1,800,000
    20     (ii)  Southwest Pennsylvania Rail
    21         Rehabilitation Program                          1,200,000
    22     (iii)  Fay-Penn Transportation Company
    23         (A)  Rehabilitation of 21.6 miles of rail
    24             line from Fair Chance Business Park to
    25             Mt. Pleasant in Westmoreland County           750,000
    26  (21)  GREENE COUNTY                                               <--
    27     (I)  GREENE COUNTY INDUSTRIAL DEVELOPMENT
    28         AUTHORITY
    29         (A)  CONSTRUCTION OF A SPUR TO SERVE
    30             AIRPORT INDUSTRIAL PARK                     1,000,000
    19970S0188B1336                 - 81 -

     1  (19) (22)  Indiana County                                         <--
     2     (i)  Genesee and Wyoming Railroad                              <--
     3         (A)  Punxsutawney to Falls Creek                1,000,000
     4     (ii) (I)  Pittsburgh and Shawmut Railroad                      <--
     5         (A)  Rehabilitation of Pittsburgh and
     6             Shawmut Railroad between Driftwood and
     7             Kittanning, including replacement of
     8             21,797 feet of rail, replacement of
     9             deteriorating ties, resurface rail bed,
    10             renew road crossings and other
    11             miscellaneous rehabilitation                1,500,000
    12  (23)  LACKAWANNA COUNTY                                           <--
    13         (A)  PURCHASE AND REHABILITATION OF 6 MILES
    14             OF THE FORMER LAUREL LINE TRACKAGE FROM
    15             DOWNTOWN SCRANTON TO THE BOROUGH OF
    16             MOOSIC                                      4,500,000
    17             (BASE PROJECT ALLOCATION - $3,750,000)
    18             (DESIGN AND CONTINGENCIES - $750,000)
    19         (B)  ROLLING STOCK FOR LAUREL LINE
    20             PASSENGER SERVICE                           6,000,000
    21             (BASE PROJECT ALLOCATION - $5,000,000)
    22             (DESIGN AND CONTINGENCIES - $1,000,000)
    23  (24)  LACKAWANNA COUNTY RAILROAD AUTHORITY
    24         (A)  REHABILITATION OF BRIDGE 60 IN THE
    25             CITY OF SCRANTON                            3,360,000
    26             (BASE PROJECT ALLOCATION - $2,800,000)
    27             (DESIGN AND CONTINGENCIES - $560,000)
    28         (B)  PURCHASE OF LOCOMOTIVES AND ROLLING
    29             STOCK TO PROVIDE COMMUTER SERVICE
    30             BETWEEN THE CITY OF SCRANTON AND NEW
    19970S0188B1336                 - 82 -

     1             YORK CITY                                   9,600,000
     2             (BASE PROJECT ALLOCATION - $8,000,000)
     3             (DESIGN AND CONTINGENCIES - $1,600,000)
     4  (20) (25)  Lancaster County                                       <--
     5     (i)  Construction of new 1,262-foot siding for                 <--
     6         cold storage facility                             125,000
     7     (I)  ROSENBERGER COLD STORAGE COMPANY                          <--
     8         (A)  CONSTRUCTION OF NEW 1,262-FOOT SIDING
     9             FOR COLD STORAGE FACILITY                     250,000
    10  (26)  LAWRENCE COUNTY
    11     (I)  CSX RAILWAY
    12         (A)  LAWRENCE COUNTY ACQUISITION OF CSX
    13             LINE FROM NEW CASTLE JUNCTION TO
    14             ELLWOOD CITY (11.5 MILES)                   3,100,000
    15  (21) (27)  Mifflin County                                         <--
    16     (i)  SEDA-COG Joint Rail Authority
    17         (A)  Juniata Valley Railroad
    18             Reconstruction                              3,000,000
    19  (22) (28)  Monroe County                                          <--
    20     (i)  Monroe County Railroad Authority
    21         (A)  Rehabilitation of 17 miles of rail
    22             line to FRA Class III standards
    23             including purchase and installation of
    24             new crossties, raise, line and surface
    25             the entire 17 mile rail line and
    26             purchase and install relay rail on
    27             various curves on the rail line               861,000
    28         (B)  Purchase of railroad right-of-way and
    29             relay rail on approximately 1.5 miles
    30             including a bridge over the Delaware
    19970S0188B1336                 - 83 -

     1             River to allow the final linkage of
     2             track between Pennsylvania and New
     3             Jersey to reopen the passenger and
     4             freight corridor between the Pocono
     5             Mountain region of Pennsylvania and New
     6             York City                                     985,000
     7         (C)  PURCHASE AND REHABILITATE 13 MILES OF                 <--
     8             CONRAIL TRACKAGE BETWEEN ANALOMINK AND
     9             PORTLAND FOR FREIGHT AND PASSENGER
    10             SERVICES                                    1,400,000
    11     (II)  INTERMODAL CENTER PROJECT
    12         (A)  DESIGN AND CONSTRUCTION OF INTERMODAL
    13             TRANSPORTATION CENTER IN SMITHFIELD
    14             TOWNSHIP AT OR NEAR THE INTERSECTION OF
    15             I-80 AND ROUTES 611 AND 191, TO INCLUDE
    16             STATION FACILITIES, PARKING, SEWER AND
    17             WATER SERVICE AND ACCESS IMPROVEMENTS,
    18             PEDESTRIAN WALKWAYS AND RELATED SITE
    19             IMPROVEMENTS AND AMENITIES                  1,296,000
    20  (23) (29)  Montgomery County                                      <--
    21     (i)  Upper Merion and Plymouth Railroad
    22         (A)  Add three storage tracks in Plymouth
    23             Township and construct a holding/run-a-
    24             round track in Upper Merion Township at
    25             Swedeland Yard                                420,000
    26     (ii)  Lukens, Inc.                                             <--
    27         (A)  Upgrade Lukens Steel Mainline Rail
    28             facilities with ties, rails, switch
    29             appurtenances and roadbed upgrade from
    30             East to West end of plant                     440,000
    19970S0188B1336                 - 84 -

     1  (24) (30)  Northampton County
     2     (i)  Construction of siding at Todd Heller
     3         site                                              130,000
     4  (25) (31)  Northumberland, Montour and Columbia                   <--
     5     Counties
     6     (i)  SEDA-COG Joint Rail Authority
     7         (A)  Stabilize track for the North Shore
     8             Railroad to maintain Class II service         375,000
     9         (B)  Replacement of up to 2,700 crossties,
    10             reconstruction of two grade crossings
    11             and replacement of bridge timbers             300,000
    12  (26) (32)  Philadelphia County                                    <--
    13     (i)  West Philadelphia Transportation Center
    14         (A)  Rehabilitation and transformation of
    15             the old 52nd and Lancaster Streets rail
    16             station into an intermodal
    17             transportation center                       2,810,000
    18             (Base Construction Allocation -
    19             $2,300,000)
    20             (Design and Contingencies - $510,000)
    21     (ii)  Delaware and Hudson Railway Company
    22         (A)  Philadelphia Naval Base track
    23             rehabilitation, rehabilitate running
    24             track from CP Penrose to Naval Yard
    25             switch and running track and adjacent
    26             bulk loading facility, as well as four
    27             stub tracks west of Roundhouse                550,000
    28             (Base Project Allocation - $495,000)
    29             (Design and Contingencies - $55,000)
    30  (27) (33)  Schuylkill County                                      <--
    19970S0188B1336                 - 85 -

     1     (i)  Reading, Blue Mountain and Northern
     2         Railroad
     3         (A)  Rehabilitate Tamaqua and Mahanoy
     4             Tunnels, including strengthening of
     5             roof structure, installation of
     6             drainage system and renewing the rail,
     7             ties and ballast in the 900-foot
     8             Tamaqua Tunnel located 2 miles north of
     9             Tamaqua and in the 3,500-foot Mahanoy
    10             Tunnel located near Buck Mountain             640,000
    11  (28) (34)  Warren County                                          <--
    12     (i)  Replacement of crossties from Warren
    13         County to the west                                300,000
    14  (29) (35)  Washington County                                      <--
    15     (i)  Wheeling & Lake Erie Railway Company
    16         (A)  Replace, on accelerated safety basis,
    17             deck bridge ties and miscellaneous
    18             repairs on Mingo Creek Valley Bridge
    19             and Pigeon Creek Valley Bridge near
    20             Charleroi to accommodate current
    21             traffic and future intermodal traffic
    22             on Wheeling Main Line between Rook Yard
    23             and Connellsville                             375,000
    24             (Base Project Allocation - $337,000)
    25             (Design and Contingencies - $38,000)
    26         (B)  Emergency repairs needed to support
    27             rail infrastructure damaged by water-
    28             related hydraulic blowout along 200
    29             feet of side hill fill near Charleroi
    30             and to repair catastrophic
    19970S0188B1336                 - 86 -

     1             deterioration of subgrade east of
     2             Pittsburgh Rook Yard, including
     3             rebuilding of lost subgrade, repair of
     4             subsidence of various other fills and
     5             other rehabilitations to restore
     6             customer railroad service and railroad
     7             connections east of Pittsburgh                475,000  <--
     8             (Base Project Allocation - $427,000)
     9             CONNECTIONS EAST OF PITTSBURGH,                        <--
    10             INCLUDING REPAIR OF COAL SUBSIDENCE
    11             DAMAGE TO ROADBED NEAR MILE POST 31           625,000
    12             (BASE PROJECT ALLOCATION - $577,000)
    13             (Design and Contingencies - $48,000)
    14         (C)  EMERGENCY REPAIRS TO BRIDGE ABUTMENTS,                <--
    15             BACKWALL AND WING WALLS OF AVELLA
    16             BRIDGE AND MISCELLANEOUS REPAIRS TO
    17             BRIDGE DECKING INCLUDING TIES AND RAIL
    18             REPAIRS                                       275,000
    19             (BASE PROJECT ALLOCATION - $250,000)
    20             (DESIGN AND CONTINGENCIES - $25,000)
    21  (30) (36)  Westmoreland County                                    <--
    22     (i)  Westmoreland County Industrial Development
    23         Corporation
    24         (A)  Construction of a spur from site of
    25             proposed Sony Glass Plant                     163,000
    26         (B)  Greensburg Cluster/CSX -
    27             reconstruction of rail lines                  500,000
    28  (31) (37)  York County                                            <--
    29     (i)  Maryland and Pennsylvania Railroad
    30         (A)  Rehabilitation of Poorhouse Yard rail
    19970S0188B1336                 - 87 -

     1             and turnouts                                  424,000
     2         (B)  Accelerated rehabilitation of 2.5
     3             miles of original rail on East Branch
     4             to avoid derailments and eliminate
     5             damage to customer shipments,
     6             including, but not limited to, new
     7             rail, crossties, improved drainage
     8             system and new ballast                        704,000
     9     (ii)  Emons Logistics Services, Inc.
    10         (A)  Installation of new track system,
    11             environmental controls, heating, paving
    12             and the construction of bulk intermodal
    13             transfer terminal on York Rail
    14             including facilities to prevent
    15             contamination of project and to protect
    16             from inclement weather                      1,275,000
    17     (iii)  York Rail
    18         (A)  Construction of rail siding to serve
    19             new warehouse of York County Industrial
    20             Development Corporation                       165,000
    21  (32) (38)  Buffalo and Pittsburgh Railroad                        <--
    22     (i)  Additional funds for rehabilitation of
    23         various mainline segments of Buffalo and
    24         Pittsburgh Railroad to Class III and/or
    25         Class II standards
    26         (A)  Butler to Bruin mainline track road
    27             crossing and bridge work
    28             rehabilitation                              3,000,000
    29         (B)  Mainline from Falls Creek (DuBois) to
    30             Ridgeway                                    2,300,000
    19970S0188B1336                 - 88 -

     1         (C)  Mainline from Ridgeway to Johnsonburg
     2             - relocation of B&P track and
     3             consolidation of traffic from
     4             Johnsonburg to Ridgway                      3,925,000
     5         (D)  Mainline from Eidenau to Punxsutawney
     6             - Phase 2                                   2,575,000
     7  (33) (39)  Pittsburgh and Shawmut Railroad, Inc.                  <--
     8     (i)  Rehabilitation of rail infrastructure and
     9         railroad tracks of various segments of the
    10         Pittsburgh and Shawmut Railroad, Inc.             303,000
    11  (34) (40)  Department of Transportation                           <--
    12     (I)  FOUR COMPLETE HIGH-SPEED, HIGH HORSEPOWER                 <--
    13         TRAIN SETS BUILT TO NATIONAL RAILROAD
    14         PASSENGER CORPORATION (AMTRAK)
    15         SPECIFICATIONS AND TO BE PURCHASED OR
    16         LEASED AS AN AMENDMENT TO AMTRAK'S BID
    17         AWARD FOR NORTHEAST CORRIDOR HIGH SPEED
    18         TRANSPORTATION OR BY SEPARATE COMPETITIVE
    19         BIDS. THESE TRAIN SETS MAY BE EITHER
    20         ELECTRIC OR FOSSIL FUEL TO BE USED ON
    21         PENNSYLVANIA'S KEYSTONE CORRIDOR AND
    22         ELSEWHERE IN THIS COMMONWEALTH                140,000,000
    23     (II)  PURCHASE OF SITE AND CONSTRUCTION OF
    24         TRANSIT MAINTENANCE FACILITY                   10,000,000
    25     (III)  STATEWIDE COMPREHENSIVE RAIL PASSENGER
    26         STRATEGIC PLANNING STUDY                          350,000
    27     (i) (IV)  Rehabilitation and any other repair                  <--
    28         of flood-related damage to railroad lines.
    29         This authorization shall be allocated by
    30         the Department of Transportation to the
    19970S0188B1336                 - 89 -

     1         following railroads: Buffalo & Pittsburgh
     2         Railroad Company; Holidaysburg & Roaring
     3         Springs Railroad; Everett Railroad Company;
     4         Towanda & Monroeton Railroad; Allegheny &
     5         Eastern Railroad, Inc.; CSX, DELAWARE AND                  <--
     6         HUDSON RAILWAY, Chestnut Ridge Railway
     7         Company; Nittany & Bald Eagle Railroad
     8         Company; North Shore Railroad Company; Blue
     9         Ridge Industries; Luzerne County Rail
    10         Corporation; Pennsylvania Power & Light;
    11         Shamokin Valley Railroad Company;
    12         Stourbridge Railroad Company; Wellsboro &
    13         Corning Railroad Company; Union County
    14         Industrial Railroad Company; Oil Creek &
    15         Titusville Lines, Inc.; Southwest
    16         Pennsylvania Railroad Company; and Maryland
    17         & Pennsylvania Railroad Company                 1,100,000  <--
    18         & PENNSYLVANIA RAILROAD COMPANY                 1,621,000  <--
    19     (V)  IMPROVEMENTS TO TRAIN STATION AT MOUNT
    20         JOY, LANCASTER COUNTY                             100,000
    21     (c)  Air transportation.--Additional capital projects in the
    22  category of transportation assistance projects for air
    23  transportation service to which an interest is to be acquired by
    24  the Department of Transportation, its successors or assigns, and
    25  to be financed by the incurring of debt are hereby itemized,
    26  together with their respective estimated financial costs, as
    27  follows:                                                 Total
    28                                                          Project
    29             Project                                    Allocation
    30  (1)  Connellsville Airport, Fayette County                        <--
    19970S0188B1336                 - 90 -

     1     (i)  Rehabilitation of runway, taxiway and
     2         runway lighting                                    35,000
     3     (ii)  Expansion of current runway and other
     4         airport improvements                           17,000,000
     5  (2) (1)  Clearfield-Jefferson County Regional                     <--
     6     Airport Authority
     7     (i)  Renovate Beechwoods Administration
     8         Building                                          150,000
     9     (ii)  Upgrade and renovate crash, fire and
    10         rescue building                                    15,000
    11     (iii)  Renovate terminal building                      66,000
    12     (iv)  Renovate Mesa hangar                            125,000  <--
    13     (v)  Remove contaminated soil at fuel farm            100,000
    14     (IV)  LEGAL EXPENSES ASSOCIATED WITH                           <--
    15         ENVIRONMENTAL LITIGATION                          100,000
    16     (V)  PURCHASE BACKHOE FOR MAINTENANCE                  40,000
    17     (vi)  Acquisition of 1,000-gallon jet fuel
    18         truck                                              80,000
    19     (vii)  Acquisition of disabled passenger lift          20,000
    20     (viii)  Construction of access road to new T-
    21         hangar                                             50,000
    22     (IX)  RENOVATION OF EXISTING T-HANGAR FOR                      <--
    23         AIRCRAFT STORAGE                                   60,000
    24     (X)  RELOCATION OF AIRPORT AUTHORITY OFFICES           25,000
    25  (3) (2)  St. Marys Airport Authority                              <--
    26     (i)  Refurbish existing hangars                        89,000
    27     (ii)  Purchase of grass cutting and landscape
    28         equipment                                         100,000
    29     (iii)  Construction of new commercial hangar          125,000
    30     (iv)  Construction of new T-hangar                    120,000
    19970S0188B1336                 - 91 -

     1     (v)  Construction of new terminal building            160,000
     2     (vi)  Maintenance equipment                             7,000
     3     (vii)  Storage building and sidewalks                   7,000
     4     (viii)  Unicom radios and weather station               7,000
     5     (ix)  Sewage system and utilities                     300,000
     6     (x)  Rehab tiedown apron and construct T-
     7         hangar                                             10,000
     8     (xi)  Storm water management plan                       3,000
     9     (xii)  Snow removal equipment                           7,000
    10     (xiii)  Runway reconstruction and access road
    11         relocation                                         38,000
    12     (xiv)  Extend runway 700 feet                          50,000
    13     (xv)  Master plan update AWO5 III                      10,000
    14  (4) (3)  Bradford Regional Airport Authority                      <--
    15     (i)  Construct new T-hangar                           300,000
    16     (ii)  Construct corporate hangar                      300,000
    17     (iii)  Replace door on corporate hangar                28,000
    18     (iv)  Expand snow equipment building, purchase
    19         snow plow                                          12,000
    20     (V)  ADDITIONAL DEVELOPMENT AND REPAIRS TO                     <--
    21         AIRPORT                                         1,200,000
    22  (5) (4)  Corry Lawrence Airport Authority                         <--
    23     (i)  Perimeter fencing and snow removal
    24         equipment                                          22,000
    25     (ii)  Construct new aircraft hangar                   198,000
    26     (iii)  Construct addition to terminal building         83,000
    27     (iv)  Seal coat runway, taxiways, apron and
    28         paint markings                                     60,000
    29     (v)  Expand parking area                               28,000
    30     (vi)  Property acquisition                             35,000
    19970S0188B1336                 - 92 -

     1     (vii)  Snow removal equipment                           4,000
     2     (viii)  Purchase backhoe                               21,000
     3     (ix)  Construct hangar taxiway                          8,000
     4     (x)  Master plan update                                 1,000
     5     (xi)  Rotating beacon                                   4,000
     6     (xii)  Construct hangars                              263,000
     7     (xiii)  Purchase crack sealing machine                 26,000
     8     (xiv)  Obstruction removal                              2,000
     9  (6) (5)  Fayette County Airport Authority                         <--
    10     (i)  Expansion Project                             17,000,000
    11     (ii)  Fayette County Air Transportation
    12         Strategic Planning Study                          100,000
    13     (III)  REHABILITATION OF RUNWAY, TAXIWAY AND                   <--
    14         RUNWAY LIGHTING                                   100,000
    15  (7) (6)  Reading Regional Airport Authority                       <--
    16     (i)  Renovation and widening of Leisz's Bridge
    17         and Mitchell Roads                              1,000,000
    18     (ii)  Construction of a noise barrier wall
    19         around the run-up area                             50,000  <--
    20         AROUND THE RUN-UP AREA                            100,000  <--
    21     (iii)  Purchase airfield turf maintenance
    22         equipment                                         125,000
    23     (iv)  Purchase airfield and property CAD
    24         system                                             25,000
    25     (V)  RENOVATION OF FISHER ROAD                        100,000  <--
    26  (8) (7)  Westmoreland County Airport, Westmoreland                <--
    27     County
    28     (i)  Modernization of the main terminal
    29         building and expansion of the commercial
    30         service wing and parking                        1,800,000  <--
    19970S0188B1336                 - 93 -

     1         SERVICE WING AND PARKING                        3,300,000  <--
     2     (II)  LAND ACQUISITION AND DEVELOPMENT OF AIR
     3         INDUSTRIAL PARK                                 2,500,000
     4  (9) (8)  Lancaster Airport                                        <--
     5     (i)  Terminal expansion                               337,000
     6  (10) (9)  Bedford County Air Industrial Authority                 <--
     7     (i)  Lengthening of runway/taxiway and building
     8         of an access road                                 378,000
     9  (11) (10)  Blair County Airport Authority                         <--
    10     (i)  Lengthening and strengthening of runways      22,000,000
    11     (II)  BLAIR COUNTY AIR TRANSPORTATION STRATEGIC                <--
    12         PLANNING STUDY                                    120,000
    13  (12) (11)  Huntingdon County                                      <--
    14     (i)  Acquisition and improvements to the
    15         existing airport                                1,200,000
    16  (13) (12)  Venango Regional Airport                               <--
    17     (i)  Property acquisition                              35,000
    18     (ii)  Snow removal equipment                            4,000
    19     (iii)  Purchase backhoe                                21,000
    20     (iv)  Construct hangar taxiway                          8,000
    21     (v)  Master plan update                                 1,000
    22     (vi)  Rotating beacon                                   4,000
    23     (vii)  Construct hangars                              263,000
    24     (viii)  Purchase crack sealing machine                 26,000
    25     (ix)  Obstruction removal                               2,000
    26     (X)  ACQUIRE 3,000 GALLON JET REFUELER                 90,000  <--
    27     (XI)  REFURBISH COUNTY HANGAR NO. 6                   175,000
    28     (XII)  INSTALL NEW HANGAR DOOR ON COUNTY HANGAR
    29         NO. 7                                              40,000
    30     (XIII)  T-HANGAR TAXIWAY PHASE II                     120,000
    19970S0188B1336                 - 94 -

     1     (XIV)  CONSTRUCT HANGAR AND HELIPAD                   375,000
     2     (XV)  REPAIR WIND SPEED AND DIRECTION
     3         INDICATOR                                           2,000
     4     (XVI)  INSTALL UNICOM RADIO BASE STATION                5,000
     5  (14) (13)  Allegheny County Airport                               <--
     6     (i)  Rehabilitation of runway 5-23, hangar 40,
     7         taxiways and construction of new hangars        5,575,000
     8  (15) (14)  Beaver County Airport                                  <--
     9     (i)  Navigational aids update - relocate
    10         compass rose, lighted wind cone, beacon and
    11         AWOS                                              200,000
    12     (ii)  High intensity runway lights and medium
    13         intensity taxiway lights                          400,000
    14     (iii)  Construction of T-hangar - four to ten
    15         single-hangar and twin-hangar units               920,000
    16     (iv)  Terminal expansion                              500,000
    17     (v)  Resurface main apron                             600,000
    18     (vi)  Apron and taxiway rehabilitation                667,000
    19     (vii)  Storm water management system                  556,000
    20     (viii)  Resurface parking areas                       200,000
    21  (16) (15)  Bradford County                                        <--
    22     (i)  Airport at Towanda
    23         (A)  Construction of T-hangars                    150,000
    24  (17) (16)  Northumberland/Montour Airport                         <--
    25     Commission
    26     (i)  Land acquisition                                 100,000
    27     (ii)  Runway improvements                           1,000,000
    28  (17)  CHESTER COUNTY, G.O. CARLSON AIRPORT                        <--
    29     (I)  STRATEGIC PLANNING STUDY                         120,000
    30  (18)  MIDSTATE AIRPORT
    19970S0188B1336                 - 95 -

     1     (I)  CONSTRUCTION OF 40 T-HANGAR UNITS              1,040,000
     2  (19)  GRAND CANYON STATE AIRPORT, TIOGA COUNTY
     3     (I)  CONSTRUCTION OF 20 HANGARS                       500,000
     4             (BASE PROJECT ALLOCATION - $400,000)
     5             (DESIGN AND CONTINGENCIES - $100,000)
     6  (20)  MONTOURSVILLE, WILLIAMSPORT LYCOMING AIRPORT
     7     (I)  AIRPORT RUNWAY EXTENSION                       7,500,000
     8     (II)  AIRPORT ACCESS ROAD FROM I-80 TO AIRPORT      7,500,000
     9  (21)  LACKAWANNA AND LUZERNE COUNTIES - WILKES-
    10     BARRE/SCRANTON INTERNATIONAL AIRPORT
    11     (I)  CONSTRUCTION OF A NEW PASSENGER TERMINAL
    12         BUILDING, TERMINAL APRON, AIR TRAFFIC
    13         CONTROL TOWER, AIRCRAFT RESCUE/FIREFIGHTING
    14         BUILDING, PARKING FACILITY, INFRASTRUCTURE
    15         AND ALL RELATED PROJECTS                       15,000,000
    16  (22)  PITTSBURGH INTERNATIONAL AIRPORT
    17     (I)  ENHANCED TRANSIT SYSTEM, SHUTTLE SYSTEM
    18         AND SIGNAGE BETWEEN LANDSIDE AND AIRSIDE
    19         TERMINALS                                       4,000,000
    20  (23)  WASHINGTON COUNTY AIRPORT
    21     (I)  ELECTRONIC GUIDANCE SYSTEM FOR INCLEMENT
    22         WEATHER OPERATIONS                                250,000
    23     (II)  COMPLETION OF INSTRUMENT LANDING SYSTEM       1,500,000
    24     (III)  LAND ACQUISITION, DEVELOPMENT AND
    25         EXPANSION OF ON-BASE OPERATIONS                 4,000,000
    26  (24)  SOMERSET COUNTY AIRPORT, SOMERSET COUNTY
    27     (I)  CONSTRUCTION OF NEW TERMINAL BUILDING,
    28         INCLUDING ARCHITECTURE AND ENGINEERING
    29         COSTS                                             527,000
    30     (II)  FURNITURE AND EQUIPMENT                          33,000
    19970S0188B1336                 - 96 -

     1     (III)  RESURFACING PARKING AREA                        56,000
     2  (25)  CENTRE COUNTY
     3     (I)  RENOVATION AND EXPANSION OF UNIVERSITY
     4         PARK AIRPORT                                    1,240,000
     5  (26)  CAMBRIA COUNTY AIRPORT
     6     (I)  INFRASTRUCTURE IMPROVEMENTS                    1,500,000
     7  Section 6.  Itemization of redevelopment assistance projects.
     8     Additional capital projects in the category of redevelopment
     9  assistance projects for capital grants by the Department of
    10  Community and Economic Development, its successors or assigns,
    11  authorized under the provisions of the act of May 20, 1949
    12  (P.L.1633, No.493), known as the Housing and Redevelopment
    13  Assistance Law, and redevelopment assistance capital projects
    14  and to be financed by the incurring of debt, are hereby
    15  itemized, together with their estimated financial costs, as
    16  follows:
    17                                                           Total
    18                                                          Project
    19             Project                                    Allocation
    20  (1)  Adams County
    21     (i)  Development of historic pathway on Lincoln
    22         Square, Borough of Gettysburg                   5,100,000
    23  (2)  Allegheny County
    24     (i)  City of Pittsburgh
    25         (A)  Senator John Heinz Pittsburgh Regional
    26             History Center - Completion of the
    27             development of Senator John Heinz
    28             Pittsburgh Regional History Center          5,000,000
    29         (B)  Pittsburgh Technology Center Site
    30             Development - Continued development and
    19970S0188B1336                 - 97 -

     1             expansion of the Pittsburgh Technology
     2             Center to include the LTV site on the
     3             Southside                                  38,000,000
     4         (C)  Three Rivers Stadium enhancements         75,000,000
     5         (D)  Greater Pittsburgh Community Food
     6             Bank                                        1,000,000  <--
     7             BANK                                        3,000,000  <--
     8         (E)  Fifth Avenue, Forbes Avenue and Wood
     9             Street, infrastructure acquisition,
    10             demolition, reconstruction and public
    11             space improvements                         20,000,000
    12         (F)  Nine Mile Run, environmental
    13             reclamation and site preparation           20,000,000
    14         (G)  Life Science Development Incubator,
    15             infrastructure improvements                10,000,000
    16         (H)  Software Product Development Center,
    17             land acquisition and infrastructure
    18             improvements                               10,000,000
    19         (I)  Rockwell Site Development                 10,000,000
    20         (J)  Byham Theater, Phase III renovation        3,500,000
    21         (K)  For the acquisition and renovation of
    22             the existing Coraopolis Rail Station
    23             for the Coraopolis Railroad Museum          3,000,000
    24         (L)  Mattress Factory - Federal North
    25             Project - Transformation of an adult
    26             theater adjacent to Allegheny General
    27             Hospital to provide for an area
    28             integrating arts, education, commerce
    29             and residences                              3,500,000
    30         (M)  Hot metal bridge reconstruction and
    19970S0188B1336                 - 98 -

     1             rehabilitation to connect Pittsburgh
     2             Technology Center to the LTV site on
     3             the south side                              2,500,000  <--
     4         (N)  Pittsburgh African-American Museum         1,500,000
     5             THE SOUTH SIDE                              5,000,000  <--
     6         (N)  PITTSBURGH AFRICAN-AMERICAN MUSEUM         7,500,000
     7         (O)  Pennsylvania Public Law Center             5,500,000
     8         (P)  Acquisition and rehabilitation of
     9             property for programmatic space on
    10             Jacksonia Street and Sampsonia Way for
    11             the Mattress Factory Art Institution          500,000
    12         (Q)  Rehabilitation of Pittsburgh Ballet
    13             Theater Training Facility                     300,000
    14         (R)  THE MARTIN LUTHER KING, JR. CULTURAL                  <--
    15             CENTER, CONSTRUCTION OF A BUILDING AS
    16             PART OF THE MARTIN LUTHER KING, JR.
    17             READING CENTER/MARTIN LUTHER KING, JR.
    18             CULTURAL CENTER                             5,000,000
    19         (S)  RENOVATIONS OF THE NEW GRANADA THEATER
    20             AS A PERFORMING ARTS THEATER AND
    21             RECORDING CENTER                            5,000,000
    22         (T)  RENOVATION OF YWCA DOWNTOWN
    23             HEADQUARTERS AND CONSTRUCTION OF INNER-
    24             CITY NEIGHBORHOOD YWCA FACILITY             2,000,000
    25         (U)  REPLACEMENT OF HOMEWOOD-BRUSHTON YWCA
    26             BUILDING                                      200,000
    27         (V)  PROGRAM FOR FEMALE OFFENDERS FOR THE
    28             CONSTRUCTION OF A FACILITY TO HOUSE
    29             SERVICE PROGRAMS AND ADMINISTRATIVE
    30             OFFICES                                       700,000
    19970S0188B1336                 - 99 -

     1         (W)  HEINZ HALL REPAIRS AND RENOVATIONS         8,000,000
     2         (X)  CONSTRUCTION OF REGIONAL DESTINATION
     3             FACILITIES, AS DEFINED IN SECTION 3013
     4             OF THE ACT OF AUGUST 9, 1955 (P.L.323,
     5             NO.130), KNOWN AS THE COUNTY CODE. NO
     6             LESS THAN 40% OF THE FUNDS SHALL BE
     7             USED FOR EXPANSION OF THE DAVID L.
     8             LAWRENCE CONVENTION CENTER AND NOT LESS
     9             THAN 5% OF THE FUNDS SHALL BE USED FOR
    10             PARKS AND THEATERS IN THE CULTURAL
    11             DISTRICT                                  361,000,000
    12         (Y)  PITTSBURGH SUPERCOMPUTING CENTER
    13             NETWORKING EQUIPMENT FOR THE NEXT
    14             GENERATION INTERNET INITIATIVE                770,000
    15         (Z)  PITTSBURGH SUPERCOMPUTING CENTER
    16             TECHNICAL VISUALIZATION CAPABILITY FOR
    17             PENNSYLVANIA-BASED RESEARCH
    18             INSTITUTIONS                                  820,000
    19         (AA)  PITTSBURGH SUPERCOMPUTING CENTER DATA
    20             STORAGE FACILITY                              860,000
    21     (ii)  City of Duquesne
    22         (A)  Cochrandale Redevelopment,
    23             acquisition, demolition and site
    24             development                                 1,200,000
    25         (B)  Kennywood Site Development,
    26             acquisition, and site development           2,000,000
    27         (C)  Plaza Redevelopment, acquisition and
    28             site development                            1,000,000
    29         (D)  City Center of Duquesne entrance, site
    30             improvements                                  600,000
    19970S0188B1336                 - 100 -

     1         (E)  REHABILITATION OF BRICK SHED AT CITY                  <--
     2             CENTER OF DUQUESNE                            500,000
     3         (F)  DUQUESNE STORE HOUSE REHABILITATION          725,000
     4     (iii)  County projects
     5         (A)  Tech World Site Development -
     6             Development of a technology center near
     7             the Greater Pittsburgh International
     8             Airport, including site clearance,
     9             remediation and infrastructure to
    10             support research and development, as
    11             well as light industrial developments     190,000,000
    12         (B)  Homestead Redevelopment/Site
    13             Development - New onsite access
    14             roadways and related infrastructure to
    15             support private development                 7,000,000
    16         (C)  Industrial Center of McKeesport Pipe
    17                 Mill - Redevelopment of the Pipe
    18                 Mill building on the site of former
    19                 USX McKeesport National Works into
    20                 a multitenant industrial and
    21                 business facility                       5,060,000
    22         (D)  Keystone Commons Braddock Avenue
    23                 Intermodal Facility - Development
    24                 of an intermodal facility to
    25                 relieve traffic and parking
    26                 congestion on the redevelopment
    27                 site of the former Westinghouse
    28                 East Pittsburgh Plant                   4,000,000
    29         (E)  Working Steel Museum - Construction of
    30             a tourism attraction reflecting the
    19970S0188B1336                 - 101 -

     1             history of steelmaking in southwestern
     2             Pennsylvania                               25,000,000
     3         (F)  McKees Point II - Site improvements at
     4             McKees Point to enhance improvements
     5             undertaken in Phase I                       1,500,000  <--
     6             UNDERTAKEN IN PHASE I                       2,500,000  <--
     7         (G)  301 Fifth Avenue Building - Renovation
     8             activities on publicly owned building
     9             in downtown McKeesport that serves as a
    10             center for social and public services
    11             and job creation                            1,000,000
    12         (H)  Lysle Boulevard and Sixth Avenue
    13             Parking Garages - Renovation of two
    14             multistory parking garages in downtown
    15             McKeesport                                  1,500,000
    16         (I)  Neighborhood Preservation
    17             Market/Walnut Corridor - Acquisition of
    18             blighted, tax delinquent properties in
    19             the Market/Walnut Corridor, demolition
    20             of blighted structures and abandoned
    21             public housing facility in conjunction
    22             with State Route 148 improvements,
    23             Yough River Trail and new development
    24             in this area                                1,000,000
    25         (J)  Development initiatives at various
    26             sites in Allegheny County/Pittsburgh
    27             International Airport Area                 50,000,000
    28         (K)  Steel Valley Redevelopment Project         6,262,000
    29         (L)  Findlay Connector                          3,000,000
    30         (M)  Pittsburgh International Airport
    19970S0188B1336                 - 102 -

     1             enhanced transit system                     5,000,000
     2         (N)  Carnegie Mall Project                      1,600,000
     3         (O)  Parkway West and Interstate 79
     4             interchange completion                     15,000,000
     5         (P)  Renovations to Soldiers and Sailors                   <--
     6             Memorial Hall of Allegheny County           5,000,000
     7         (P)  SOLDIERS AND SAILORS MEMORIAL HALL OF                 <--
     8             ALLEGHENY COUNTY                            6,000,000
     9             (REPLACEMENT AND RESTORATION OF TERRA
    10             COTTA ROOF TILES AND REMOVAL OF
    11             ASBESTOS - $5,000,000)
    12             (RESTORATION, REPAINTING AND RESETTING
    13             OF STONE PLATES - $1,000,000)
    14         (Q)  KEYSTONE COMMONS, CONSTRUCTION OF
    15             PASSIVE FLOODWALL FROM CONRAIL OVERPASS
    16             TO ABUTMENT ADJACENT TO THOMPSON RUN          950,000
    17         (R)  SCOTT TOWNSHIP - SEWER RECONSTRUCTION
    18             PROJECTS                                    7,500,000
    19         (S)  CONSTRUCTION OF ALLEGHENY COUNTY
    20             SANITATION PLANT                           30,000,000
    21         (T)  DEVELOPMENT OF SITE INFRASTRUCTURE AND
    22             EXPANSION OF DINOSAUR HALL AT CARNEGIE
    23             MUSEUM OF NATURAL HISTORY                  15,000,000
    24         (U)  BUILDING RENOVATIONS AND DEVELOPMENT
    25             AND CONSTRUCTION OF "FUTURE LAB: THE
    26             REGIONAL TECHNOLOGY CENTER" ON CARNEGIE
    27             SCIENCE CENTER PROPERTIES                   8,500,000
    28         (V)  EXTERIOR PRESERVATION AND
    29             REFURBISHMENT OF HISTORIC CARNEGIE
    30             MUSEUMS OF PITTSBURGH, OAKLAND
    19970S0188B1336                 - 103 -

     1             FACILITY                                    5,500,000
     2         (W)  ENERGY CONSERVATION IMPROVEMENTS
     3             INCLUDING WINDOW REPLACEMENTS AT THE
     4             ANDY WARHOL MUSEUM                            500,000
     5         (X)  ADA ACCESSIBILITY PROJECTS AND OTHER
     6             INFRASTRUCTURE IMPROVEMENTS AT HISTORIC
     7             BRANCH LIBRARIES OF THE CARNEGIE
     8             LIBRARY OF PITTSBURGH                       2,200,000
     9         (Y)  DEVELOPMENT OF A REGIONAL RESOURCE
    10             CENTER IN THE HISTORIC ALCOA BUILDING
    11             IN DOWNTOWN PITTSBURGH                      3,000,000
    12     (iv)  West Mifflin Borough
    13         (A)  Nobile Drive Sanitary Sewer                  500,000  <--
    14         (A)  NOBILE DRIVE SANITARY SEWER                  600,000  <--
    15     (v)  Wilkinsburg Borough
    16         (A)  Renaissance Development Area                 300,000
    17     (vi)  Millvale Borough
    18         (A)  Millvale riverfront development            2,200,000
    19         (B)  RENOVATION AND RECONSTRUCTION OF THE                  <--
    20             BOROUGH MUNICIPAL BUILDING IN ORDER TO
    21             MAKE IT HANDICAP ACCESSIBLE UNDER ADA
    22             GUIDELINES                                    450,000
    23     (VII)  ETNA BOROUGH
    24         (A)  RECONSTRUCTION AND REHABILITATION OF
    25             THE PINE STREET PEDESTRIAN BRIDGE
    26             LINKING THE WESTERN PART OF THE BOROUGH
    27             WITH THE CENTER OF TOWN                        35,000
    28     (VIII)  ASPINWALL BOROUGH
    29         (A)  REPLACEMENT OF 100 YEAR OLD WATER LINE
    30             ON FOURTH STREET                               82,000
    19970S0188B1336                 - 104 -

     1             (REPLACEMENT OF WATER LINE - $42,000)
     2             (STREET RECONSTRUCTION - $40,000)
     3     (IX)  SHARPSBURG BOROUGH
     4         (A)  RENOVATION AND RECONSTRUCTION OF THE
     5             BOROUGH MUNICIPAL BUILDING IN ORDER TO
     6             MAKE IT HANDICAP ACCESSIBLE UNDER ADA
     7             GUIDELINES                                    250,000
     8     (vii) (X)  Scott Township                                      <--
     9         (A)  Sewer repair along Spring Valley Road
    10             and Rock Hill Road                          5,895,000
    11     (XI)  BRADDOCK AND RANKIN                                      <--
    12         (A)  ACQUISITION AND IMPROVEMENT OF
    13             ABANDONED RAIL LINE                           350,000
    14     (XII)  CITY OF MCKEESPORT
    15         (A)  INDUSTRY ROAD MULTI-OCCUPANCY COMPLEX      1,600,000
    16  (3)  ARMSTRONG COUNTY
    17     (I)  FIRE SCHOOL
    18         (A)  EQUIPMENT AND TRAINING                        50,000
    19  (4)  BEAVER COUNTY
    20     (I)  CORPORATION FOR ECONOMIC DEVELOPMENT
    21         (A)  INFRASTRUCTURE IMPROVEMENTS TO
    22             ALIQUIPPA SITE                              5,000,000
    23         (B)  DEVELOPMENT OF FORMER B&W SITES            5,000,000
    24     (II)  ROUTE 18 CORRIDOR
    25         (A)  COMPLETION OF PLAN FOR IMPROVEMENTS
    26             ALONG ROUTE 18                                 75,000
    27     (III)  HOTEL/CONFERENCE CENTER
    28         (A)  INFRASTRUCTURE IMPROVEMENTS                  500,000
    29     (IV)  CO-OP INCUBATOR
    30         (A)  COMPLETE ROOF REPAIRS TO INCUBATOR            25,000
    19970S0188B1336                 - 105 -

     1     (V)  MULTITENANT FACILITY
     2         (A)  DESIGN AND CONSTRUCT NEW MULTITENANT
     3             FACILITY                                    1,500,000
     4     (VI)  ALIQUIPPA SCHOOL DISTRICT
     5         (A)  ROOF REPLACEMENTS FOR FIVE SCHOOL
     6             BUILDINGS                                   1,000,000
     7     (VII)  INFRASTRUCTURE SITE IMPROVEMENTS AND
     8         DEVELOPMENT OF BUSINESS SITES ON ROUTE 60
     9         FROM HOPEWELL TOWNSHIP TO CHIPPEWA
    10         TOWNSHIP                                        1,000,000
    11  (2.1) (5)  Bedford County                                         <--
    12     (i)  Bedford Borough
    13         (A)  Acquisition, development and
    14             construction of joint borough/county
    15             handicapped accessible office and
    16             parking facility                            3,500,000
    17         (B)  ACQUISITION AND RENOVATION OF THE FORD                <--
    18             GARAGE                                      5,000,000
    19  (3) (6)  Berks County                                             <--
    20     (i)  City of Reading
    21         (A)  Improvements to municipal stadium            200,000
    22         (B)  RESTORATION OF FRANKLIN STREET TRAIN                  <--
    23             STATION                                     3,000,000
    24         (C)  RESTORATION OF WALLS LEADING TO
    25             PAGODA                                      2,000,000
    26         (D)  RESTORATION OF EXTERIOR WALLS AND
    27             REPLACEMENT OF WINDOWS AT HUGH CARCELLA
    28             APARTMENTS LOW-INCOME SENIOR CITIZEN
    29             HOUSING                                     1,000,000
    30         (E)  CONSTRUCTION OF POLICE ACADEMY ON LAND
    19970S0188B1336                 - 106 -

     1             DONATED BY READING AREA COMMUNITY
     2             COLLEGE                                    10,000,000
     3         (F)  CONSTRUCTION OF A PIER AT READING AREA
     4             COMMUNITY COLLEGE                           1,000,000
     5         (G)  MID-ATLANTIC AIR MUSEUM, ADDITIONAL
     6             HANGAR AT AIR MUSEUM IN BERN TOWNSHIP         550,000
     7         (H)  CONSTRUCTION OF FIRE STATION IN
     8             MUHLENBERG TOWNSHIP                           160,000
     9         (I)  CONSTRUCTION OF POLICE STATION FOR
    10             CENTRAL BERKS REGIONAL POLICE
    11             DEPARTMENT                                    300,000
    12  (4) (7)  Blair County                                             <--
    13     (i)  County Projects
    14         (A)  Construction and Development of Blair
    15             County baseball field and stadium          10,000,000  <--
    16             COUNTY BASEBALL FIELD AND STADIUM          10,800,000  <--
    17         (B)  BLAIR COUNTY HISTORICAL SOCIETY            1,400,000
    18     (ii)  SR 0220
    19         (A)  Improve access from SR 0220 along Ski
    20             Gap Road to Blue Knob                      11,000,000
    21     (III)  LOGAN TOWNSHIP                                          <--
    22         (A)  RESTORATION OF THE LEAP-THE-DIPS
    23             HISTORIC ROLLER COASTER                     2,400,000
    24     (IV)  CITY OF ALTOONA
    25         (A)  REHABILITATION OF THE MISHLER THEATRE      1,600,000
    26         (B)  FABRICATION OF EXHIBITS FOR THE
    27             ALTOONA HERITAGE DISCOVERY CENTER           2,200,000
    28     (V)  BOROUGH OF HOLLIDAYSBURG
    29         (A)  CONSTRUCTION OF THE HOLLIDAYSBURG
    30             CANAL BASIN PARK PHASE II                   3,460,000
    19970S0188B1336                 - 107 -

     1     (iii) (VI)  Tyrone Borough                                     <--
     2         (A)  Tyrone Historic Railroad Park - Phase
     3             I                                              75,000
     4     (iv) (VII)  Altoona-Blair County Development                   <--
     5         Corporation
     6         (A)  Multi-Modal Industrial Park
     7             Distribution Center                         3,000,000
     8         (B)  Altoona-Blair County Air Park - Air
     9             Freight/Air Cargo Distribution
    10             Facilities                                  3,500,000
    11         (C)  Business/Research Park - I-99 Corridor
    12             Location                                    2,500,000
    13         (D)  Entrepreneurial/Business Resource
    14             Center                                      2,500,000
    15  (8)  BUTLER COUNTY                                                <--
    16     (I)  CITY OF BUTLER
    17         (A)  INFRASTRUCTURE DEVELOPMENT FOR PULLMAN
    18             CENTER                                      1,500,000
    19         (B)  DEMOLITION OF OLD CAFETERIA BUILDING
    20             AT THE PULLMAN SITE                           325,000
    21         (C)  DEMOLITION OF OLD WOOLWORTH BUILDING         400,000
    22     (II)  EAST BUTLER BOROUGH
    23         (A)  IMPROVEMENTS TO BOROUGH BUILDING             150,000
    24     (III)  CONNOQUENESSING TOWNSHIP
    25         (A)  ADDITION TO TRUCK ROOM BUILDING               75,000
    26     (IV)  OAKLAND TOWNSHIP
    27         (A)  PURCHASE 200 SPEED LIMIT SIGNS                25,000
    28     (V)  WINFIELD TOWNSHIP
    29         (A)  ENGINEERING FOR DEVELOPMENT OF PARK
    30             AND RECREATION FACILITIES                      15,000
    19970S0188B1336                 - 108 -

     1         (B)  UPDATE ZONING, SUBDIVISION AND LAND
     2             DEVELOPMENT ORDINANCES                         10,000
     3     (VI)  CHICORA BOROUGH
     4         (A)  SCHOOL CROSSING LIGHTS                         8,000
     5         (B)  CONSTRUCTION OF A 15 FEET BY 25 FEET
     6             STORAGE BUILDING                               25,000
     7         (C)  REPLACEMENT OF OBSOLETE WATER LINES        2,000,000
     8  (4.1) (9)  Cambria County                                         <--
     9     (i)  Elder Township
    10         (A)  Construction of access road to the
    11             Hastings Industrial Park                      600,000
    12     (ii)  City of Johnstown
    13         (A)  Renovation of Cambria County War
    14             Memorial                                   15,000,000
    15         (B)  COMPLETION OF THE POINT STADIUM                       <--
    16             PROJECT                                     3,000,000
    17         (C)  BETHLEHEM/CAMBRIA IRON MIXED USE SITE
    18             PROJECT                                     8,000,000
    19         (D)  REHABILITATION AND UPGRADE OF
    20             ABANDONED AND UNDERUTILIZED INDUSTRIAL
    21             SITES                                       1,500,000
    22         (E)  PHASE II CONSTRUCTION AND EXHIBIT
    23             FABRICATION FOR THE JOHNSTOWN HERITAGE
    24             DISCOVERY CENTER                            8,700,000
    25         (F)  ACQUISITION AND RENOVATION OF THE
    26             CAMBRIA IRONWORKS INTERPRETIVE CENTER      11,000,000
    27     (III)  COUNTY PROJECT
    28         (A)  REHABILITATION OF HIGHLAND REGIONAL
    29             PARK/HIGHLAND FIELD                            51,000
    30         (B)  JOHNSTOWN INDUSTRIAL PARK RELOCATION
    19970S0188B1336                 - 109 -

     1             OF ALLENBIL ROAD                              500,000
     2  (5) (10)  Chester County                                          <--
     3     (i)  Tredyffrin Township
     4         (A)  Rehabilitation of Strafford Railroad
     5             Station                                       450,000
     6     (II)  BOROUGH OF PHOENIXVILLE                                  <--
     7         (A)  DEVELOPMENT OF FOUNDRY BUILDING            1,500,000
     8  (5.1) (11)  Clarion County                                        <--
     9     (i)  Sligo Borough
    10         (A)  Drill well and replace main water
    11             line                                          170,000
    12     (ii)  Paint Township
    13         (A)  Water line extension                       1,400,000
    14         (B)  Sewer line extension                       1,600,000
    15     (iii)  City of Rimersburg
    16         (A)  Repair existing water storage tank,
    17             erect a larger tank and replace water
    18             lines                                         700,000
    19         (B)  Replace deteriorated sewer lines and
    20             manholes                                      550,000
    21  (12)  CLEARFIELD COUNTY                                           <--
    22     (I)  COOPER TOWNSHIP
    23         (A)  IMPROVEMENTS TO FACILITIES AT
    24             INDUSTRIAL PARK                             2,000,000
    25     (II)  CLEARFIELD BOROUGH
    26         (A)  RENOVATIONS AND REHABILITATION OF
    27             HISTORIC STRUCTURES                         1,000,000
    28     (III)  CURWENSVILLE BOROUGH
    29         (A)  IMPROVEMENTS AND RENOVATIONS OF
    30             DOWNTOWN AREAS                              1,000,000
    19970S0188B1336                 - 110 -

     1     (IV)  OSCEOLA MILLS BOROUGH
     2         (A)  IMPROVEMENTS AND RENOVATIONS TO
     3             DOWNTOWN AREAS                              1,000,000
     4     (V)  HOUTZDALE BOROUGH
     5         (A)  IMPROVEMENTS AND RENOVATIONS TO
     6             DOWNTOWN AREAS                              1,000,000
     7  (13)  COLUMBIA COUNTY
     8     (I)  TOWN OF BLOOMSBURG
     9         (A)  CONSTRUCTION OF CHILDREN'S MUSEUM            400,000
    10     (II)  COUNTY PROJECT
    11         (A)  ACQUISITION OF LAND AND DEVELOPMENT OF
    12             INDUSTRIAL PARK                             3,500,000
    13  (14)  CUMBERLAND COUNTY
    14     (I)  CARLISLE BOROUGH
    15         (A)  CARLISLE HOTEL AND PARKING GARAGE
    16             PROJECT                                     8,300,000
    17  (6) (15)  Dauphin County                                          <--
    18     (i)  City of Harrisburg                                        <--
    19     (I)  COUNTY PROJECT                                            <--
    20         (A)  DEVELOPMENT AND CONSTRUCTION OF A
    21             REGIONAL SPORTS FACILITY                   35,000,000
    22     (II)  CITY OF HARRISBURG
    23         (A)  Construction and Development of the
    24             Pennsylvania Sports Hall of Fame
    25             Museum, City Island, Harrisburg             5,525,000  <--
    26             MUSEUM, CITY ISLAND, HARRISBURG             6,300,000  <--
    27         (B)  NATIONAL CIVIL WAR AND POST-CIVIL WAR
    28             MUSEUM                                      3,500,000
    29         (C)  EXPANSION/ADDITIONS TO RIVERSIDE
    30             STADIUM                                     4,000,000
    19970S0188B1336                 - 111 -

     1         (D)  THE CAPITAL CIVIC ARENA AND EXPOSITION
     2             CENTER                                     21,800,000
     3         (E)  PAXTON COMMONS IMPROVEMENTS TO SITE
     4             AND PUBLIC AREA                             2,800,000
     5         (F)  THE WHITAKER CENTER FOR THE ARTS AND
     6             SCIENCE                                     5,000,000
     7  (16)  DELAWARE COUNTY
     8     (I)  PRESERVATION OF BRANDYWINE BATTLEFIELD        10,000,000
     9  (7) (17)  Erie County                                             <--
    10     (i)  City of Erie
    11         (A)  Construction of the Pennsylvania
    12             Aquarium                                   15,000,000
    13         (B)  Renovations of and improvements to the
    14             Erie Zoo and Discover Asia Zoo              1,600,000
    15         (C)  Downtown commercial revitalization         1,000,000
    16         (D)  Erie Art Museum Expansion                    625,000
    17         (E)  BOSTON STORE REHABILITATION               13,000,000  <--
    18         (F)  TRANSPORTATION INFRASTRUCTURE AND
    19             GENERAL CONSTRUCTION IN ENTERPRISE
    20             ZONE                                          530,000
    21         (G)  CONSTRUCTION OF A NEW COMMUNITY
    22             CORRECTIONS CENTER                          2,500,000
    23         (H)  CONSTRUCTION AND IMPROVEMENTS TO
    24             DISCOVERY SQUARE                            2,000,000
    25         (I)  ERIE ZOOLOGICAL SOCIETY                   15,550,000
    26             (RENOVATIONS AND EXHIBIT SUPPLIES -
    27             $550,000)
    28             (RIVERS OF WORLD AQUATIC EXHIBIT -
    29             $15,000,000)
    30     (ii)  County Project
    19970S0188B1336                 - 112 -

     1         (A)  Improvements to Fairview Industrial
     2             Park                                        3,825,000
     3     (iii)  Greater Erie Industrial Development
     4         Corporation
     5         (A)  Development of Knowledge Park at I-                   <--
     6             90/Station Road Interchange                 7,273,000
     7             I-90/STATION ROAD INTERCHANGE               8,500,000  <--
     8         (B)  ERIE COUNTY LIBRARY                        1,000,000
     9  (8) (18)  Fayette County                                          <--
    10     (i)  City of Uniontown
    11         (A)  Fayette County Cultural Heritage
    12             Project                                     5,000,000
    13         (B)  Uniontown Parking Project                    900,000
    14         (C)  BROWNVILLE WHARF AND RIVERSIDE                        <--
    15             PROJECT                                       600,000
    16     (ii)  County Projects
    17         (A)  Construction of a Coal and Coke
    18             Interpreting Center                         3,000,000
    19         (B)  Industrial Park Project                    1,700,000  <--
    20         (B)  INDUSTRIAL PARK PROJECT                    3,000,000  <--
    21         (C)  Infrastructure Expansion Project           6,500,000
    22         (D)  Fayette County Courthouse Renovations        500,000
    23         (E)  CONSTRUCTION OF EDUCATIONAL                           <--
    24             INTERPRETATIVE CENTER AT FORT NECESSITY
    25             AS PART OF NATIONAL ROAD HERITAGE PARK      6,000,000
    26     (iii)  Fayette County Redevelopment Authority
    27         (A)  Fayette County Cultural Heritage
    28             Project                                     4,800,000
    29         (B)  Fayette County Infrastructure
    30             Development Project                         9,000,000
    19970S0188B1336                 - 113 -

     1         (C)  Fayette County Multiple Occupancy
     2             Building and Incubator Project              2,100,000
     3         (D)  Fayette County Visitor Center Project        650,000
     4         (E)  Fayette County Industrial Park
     5             Project                                     1,700,000  <--
     6             PROJECT                                     3,000,000  <--
     7         (F)  Laurel Highlands Signage Project             500,000
     8     (iv)  Connellsville Redevelopment Authority
     9         (A)  Connellsville Redevelopment Project        1,000,000
    10  (19)  FOREST COUNTY                                               <--
    11     (I)  SITE PREPARATION FOR THE HUNTING AND
    12         FISHING MUSEUM                                    150,000
    13  (8.1) (20)  Fulton County                                         <--
    14         (a)  Acquisition and development of
    15             industrial park                             1,500,000  <--
    16             INDUSTRIAL PARKS                            3,500,000  <--
    17  (21)  GREENE COUNTY
    18     (I)  COUNTY PROJECT
    19         (A)  GREENE COUNTY AIRPORT INDUSTRIAL PARK
    20             DEVELOPMENT                                 5,000,000
    21         (B)  MOUNT MORRIS INDUSTRIAL PARK SITE
    22             PREPARATION AND INFRASTRUCTURE
    23             DEVELOPMENT                                   500,000
    24  (22)  INDIANA COUNTY
    25     (I)  FIRE SCHOOL
    26         (A)  EQUIPMENT AND TRAINING                        50,000
    27     (II)  COUNTY PROJECT
    28         (A)  SALTSBURG BOROUGH CANAL PARK PROJECT       4,527,000
    29  (9) (23)  Lackawanna County                                       <--
    30     (i)  City of Carbondale
    19970S0188B1336                 - 114 -

     1         (A)  Renovate Carbondale City Hall and
     2             courthouse                                    500,000
     3         (B)  CONSTRUCTION OF A WOMEN AND FAMILY                    <--
     4             ECONOMIC AND SOCIAL ISSUES CENTER AT
     5             MARYWOOD COLLEGE, INCLUDING LAND            7,700,000
     6             (BASE PROJECT ALLOCATION - $6,500,000)
     7             (DESIGN AND CONTINGENCIES - $1,200,000)
     8         (C)  REHABILITATION AND EXPANSION OF
     9             LACKAWANNA COUNTY PRISON IN THE CITY OF
    10             SCRANTON                                    9,600,000
    11             (BASE PROJECT ALLOCATION - $8,000,000)
    12             (DESIGN AND CONTINGENCIES - $1,600,000)
    13     (II)  CITY OF SCRANTON
    14         (A)  FOR NEIGHBORHOOD REVITALIZATION, CRIME
    15             PREVENTION AND BUSINESS DISTRICT STREET
    16             BEAUTIFICATION OF MULBERRY CENTRAL
    17             NEIGHBORHOOD                                1,000,000
    18     (III)  ABINGTON TOWNSHIP
    19         (A)  CONSTRUCTION OF NEW LITTLE LEAGUE
    20             FIELDS                                         50,000
    21     (IV)  WAVERLY
    22         (A)  NEW ROOF FOR WAVERLY COMMUNITY HOUSE         300,000
    23     (V)  COVINGTON TOWNSHIP
    24         (A)  INFRASTRUCTURE DEVELOPMENT                 2,000,000
    25     (VI)  MOOSIC BOROUGH
    26         (A)  LIBRARY                                      600,000
    27         (B)  ARENA                                     30,000,000
    28     (VII)  KEYSTONE JUNIOR COLLEGE
    29         (A)  CONSTRUCTION OF NEW COMPUTER CENTER        4,000,000
    30  (10) (24)  Lancaster County                                       <--
    19970S0188B1336                 - 115 -

     1     (i)  City of Manheim
     2         (A)  Rehabilitation of the Pennsylvania
     3             Baptist State Convention Center             4,440,000
     4             (Base Construction Allocation -
     5             $3,600,000)
     6             (Design and Contingencies - $840,000)
     7  (25)  LAWRENCE COUNTY                                             <--
     8     (I)  CITY OF NEW CASTLE
     9         (A)  TOURIST MARKETPLACE PROJECT                3,000,000
    10     (II)  NEW BEAVER BOROUGH
    11         (A)  INSTALLATION OF NEW SEWER LINE FROM
    12             WAMPUM BOROUGH TO NEW BEAVER BOROUGH        1,700,000
    13     (III)  SHENANGO CHINA SITE
    14         (A)  REDEVELOPMENT OF SITE, INCLUDING
    15             ACQUISITION, DEMOLITION, ENVIRONMENTAL
    16             CLEANUP AND INSTALLATION OF NEW
    17             INFRASTRUCTURE                              1,000,000
    18     (IV)  NESHANNOCK TOWNSHIP
    19         (A)  ROUTE 60 BUSINESS PARK SITE
    20             PREPARATION AND INFRASTRUCTURE
    21             IMPROVEMENTS                                4,500,000
    22  (26)  LEHIGH COUNTY
    23     (I)  ALLENTOWN
    24         (A)  CONSTRUCTION OF AQUATIC CENTER AT
    25             CEDAR CREST COLLEGE                         2,500,000
    26  (11) (27)  Luzerne County                                         <--
    27     (i)  Wyoming Valley Sanitary Authority
    28         (A)  Westwater Treatment Plant,
    29             construction of an automated hydrated
    30             lime system                                   500,000
    19970S0188B1336                 - 116 -

     1         (B)  Rehabilitation and maintenance of
     2             individual member municipal sanitary
     3             sewer systems                               5,000,000
     4     (ii)  City of Pittston
     5         (A)  Riverfront Development Project,
     6             construction of public boat launch and
     7             dock facilities, scull boat house and
     8             dock, small-scale marina and ancillary
     9             marina facilities, pedestrian walkway
    10             and related site improvements               3,000,000
    11  (28)  LYCOMING COUNTY                                             <--
    12     (I)  COUNTY PROJECTS
    13         (A)  LYCOMING COUNTY INDUSTRIAL PARK,
    14             CONSTRUCTION                                5,000,000
    15         (B)  FLOOD MITIGATION PROJECT, LYCOMING
    16             CREEK AND LOYALSOCK CREEK                     250,000
    17     (II)  CITY OF WILLIAMSPORT
    18         (A)  BOWMAN FIELD RENOVATION PROJECT            1,500,000
    19         (B)  ACCESS ROAD TO CONNECT WAHOO DRIVE AND
    20             TRENTON AVENUE INCLUDING IMPROVEMENTS
    21             TO TRENTON AVENUE AND EXTENSION OF
    22             TRENTON AVENUE IN WILLIAMSPORT
    23             INDUSTRIAL PARK                             7,500,000
    24         (C)  MARKET STREET RAMP AND IMPROVEMENTS        4,500,000
    25  (29)  MCKEAN COUNTY
    26         (A)  CONSTRUCTION OF CONCESSION STAND AND
    27             RESTROOM FACILITIES AT KANE AREA SCHOOL
    28             DISTRICT ATHLETIC COMPLEX                     100,000
    29         (B)  TECHNOLOGY PLAN FOR COMPLETE COMPUTER
    30             HOOK-UP FOR KANE AREA SCHOOL DISTRICT         462,000
    19970S0188B1336                 - 117 -

     1  (30)  MERCER COUNTY
     2     (I)  EAST LACKAWANNOCK TOWNSHIP
     3         (A)  DEVELOPMENT OF INDUSTRIAL PARK BY
     4             EASTERN MERCER COUNTY REGIONAL
     5             DEVELOPMENT CORPORATION                     2,425,000
     6  (31)  MONROE COUNTY
     7     (I)  COUNTY PROJECT
     8         (A)  DESIGN AND CONSTRUCTION OF AN
     9             INTERMODAL CENTER PROJECT NEAR
    10             INTERSECTION OF I-80 AND ROUTES 611 AND
    11             191, INCLUDING FACILITIES, PARKING,
    12             SEWER AND WATER, ACCESS ROADS,
    13             PEDESTRIAN WAYS AND SITE IMPROVEMENTS       1,296,000
    14  (32)  MONTGOMERY COUNTY
    15     (I)  ABINGTON TOWNSHIP
    16         (A)  ENGINEERING, ACQUISITION AND
    17             CONSTRUCTION OF A TRAIL NETWORK
    18             CONNECTING NEIGHBORHOODS, HISTORIC
    19             SITES, PARKS AND SHOPPING CENTER            5,000,000
    20  (33)  NORTHAMPTON COUNTY
    21     (I)  CITY OF BETHLEHEM
    22         (A)  CONSTRUCTION OF SMART DISCOVERY
    23             CENTER                                      9,700,000
    24         (B)  ACQUISITION AND RECONSTRUCTION OF
    25             BANANA FACTORY FOR CULTURAL, ART AND
    26             COMMUNITY CENTER                              750,000
    27         (C)  HISTORIC BETHLEHEM REDEVELOPMENT
    28             PROJECT                                     1,615,000
    29     (II)  CITY OF EASTON
    30         (A)  IMPROVEMENTS, RECONSTRUCTION AND URBAN
    19970S0188B1336                 - 118 -

     1             RENEWAL                                     1,950,000
     2  (12) (34)  Northumberland County                                  <--
     3     (i)  City of Sunbury
     4         (A)  Improvements to Hunter House at Fort
     5             Augusta                                       600,000
     6  (13) (35)  Philadelphia County                                    <--
     7     (i)  City of Philadelphia
     8         (A)  Construction of Eastern Regional
     9             Police Training Facility                    7,500,000
    10         (B)  Restoration and renovation of the
    11             Sedgwick Theater as a multipurpose
    12             cultural and arts center                    1,200,000
    13         (C)  City Recreation Department -
    14             Renovation of Lonnie Young Recreation
    15             Center                                      1,500,000
    16         (D)  Schuylkill River Development Council -
    17             For site development for Phase III of
    18             the Schuylkill River Park project           2,000,000
    19         (E)  Center for Human Advancement -
    20             Challenger Learning Center
    21             rehabilitation for the Center for Human
    22             Advancement, including the development
    23             of the Challenger Learning Center           2,200,000
    24             (Base Project Allocation - $1,800,000)
    25             (Design and Contingencies - $400,000)
    26         (F)  Intercultural Family Services -
    27             Rehabilitation of the main facility of
    28             the Intercultural Family Services
    29             Center and construction of a new health
    30             services annex                              1,350,000
    19970S0188B1336                 - 119 -

     1             (Base Project Allocation - $1,100,000)
     2             (Design and Contingencies - $250,000)
     3         (G)  West Market Revitalization Project -
     4             Rehabilitation of West Market Street
     5             from 40th to 52nd Street to include
     6             retail development, economic
     7             development and public improvements         4,220,000
     8             (Base Project Allocation - $3,400,000)
     9             (Design and Contingencies - $820,000)
    10         (H)  Shoemaker Family Center -
    11             Rehabilitation of the Shoemaker Middle
    12             School into a fully restored and
    13             technologically equipped educational
    14             complex along with a full service
    15             family support center                       2,080,000
    16             (Base Project Allocation - $1,700,000)
    17             (Design and Contingencies - $380,000)
    18         (I)  Structural renovation and installation
    19             of fiber technology at the George
    20             Institute Free Library                      1,465,000
    21             (Base Construction Allocation -
    22             $1,200,000)
    23             (Design and Contingencies - $265,000)
    24         (J)  Development and construction of a
    25             major retail complex in the West
    26             Parkside community                          5,005,000
    27             (Base Construction Allocation -
    28             $4,100,000)
    29             (Design and Contingencies - $905,000)
    30         (K)  Revitalization of the Conestoga
    19970S0188B1336                 - 120 -

     1             Recreation Center in West Philadelphia      1,235,000
     2             (Base Construction Allocation -
     3             $1,000,000)
     4             (Design and Contingencies - $ 235,000)
     5         (L)  Construction of the National
     6             Constitution Center on the second block
     7             of Independence Mall between Market
     8             Street and Arch Street                     30,000,000
     9         (M)  For facility construction and
    10             renovations to the Please Touch Museum      5,000,000
    11         (N)  Enhancements to Veterans Stadium          75,000,000  <--
    12         (O)  Continued development for the Avenue
    13             of the Arts                                20,000,000
    14         (P) (N)  Construction of a Primate House at                <--
    15             the Philadelphia Zoo                        3,500,000
    16         (Q) (O)  Neighborhood Preservation                         <--
    17             acquisition and development                 4,500,000
    18         (R) (P)  Development Initiatives in                        <--
    19             Philadelphia County                        35,000,000
    20         (S) (Q)  Fairmount Park Commission -                       <--
    21             rehabilitation and site development for
    22             Schuylkill River                           18,000,000
    23         (T) (R)  Fire and safety rehabilitation for                <--
    24             the Philadelphia Art Museum                 7,000,000
    25         (U) (S)  For the development of the Gateway                <--
    26             Visitor Center on the Mall in
    27             Independence National Historic Park        10,000,000
    28         (V) (T)  St. Phillip's Community                           <--
    29             Development Corporation for capital
    30             improvement and housing development in
    19970S0188B1336                 - 121 -

     1             North Central Empowerment Zone                500,000
     2         (W) (U)  Acquisition and renovation of a                   <--
     3             building on Germantown Avenue to house
     4             the Germantown Settlement House               250,000
     5         (X) (V)  Site Development and Construction                 <--
     6             of 6701 Germantown Avenue, the site of
     7             the Wagon Wheel Inn                           500,000
     8         (Y) (W)  Construction of Regional                          <--
     9             Performing Arts Center on South Broad
    10             Street                                     20,000,000
    11         (Z) (X)  Demolition of former naval                        <--
    12             hospital on Broad and Hartranft                        <--
    13             Streets                                     3,000,000
    14             BROAD AND HARTRANFT STREETS                 8,000,000  <--
    15         (AA) (Y)  Chestnut Street Intermodal                       <--
    16             Improvement Project                         4,367,000
    17         (BB) (Z)  North Broad Street Avenue of the                 <--
    18             Arts Project -- Gateway Intersection
    19             Improvements                                7,900,000
    20         (CC) (AA)  East Falls Ridge Avenue                         <--
    21             Revitalization Project                      2,500,000
    22         (DD) (BB)  Renovations to Haddington Fire                  <--
    23             House Senior Services Center                1,100,000
    24         (EE) (CC)  Renovations to the House of                     <--
    25             Umoja Crime Prevention and Human
    26             Development Institute                       2,600,000
    27         (FF) (DD)  Demolition of Philadelphia Civic                <--
    28             Center                                     10,000,000
    29         (EE)  COMPLETION AND CONSTRUCTION OF                       <--
    30             LANCASTER AVENUE REVITALIZATION
    19970S0188B1336                 - 122 -

     1             BUSINESS PROJECT                           12,000,000
     2         (FF)  SOUTH STREET HEADHOUSE DISTRICT
     3             REDEVELOPMENT PROJECT                       3,000,000
     4         (GG)  RESURFACING AND REHABILITATION OF
     5             COMMERCIAL CORRIDOR LOCATED AT 60TH AND
     6             MARKET STREETS FROM SOUTH OF MARKET
     7             STREET TO CATHERINE STREET                  1,500,000
     8         (HH)  PHILADELPHIA OPPORTUNITIES
     9             INDUSTRIALIZATION CENTER                      350,000
    10         (II)  CONGRESSO DELATINO'S, DEVELOPMENT AND
    11             CONSTRUCTION OF COMMUNITY, JOB
    12             TRAINING, EDUCATION, HEALTH CARE AND
    13             MULTIPLE SOCIAL SERVICES FACILITY           5,000,000
    14         (JJ)  DEVELOPMENT AND CONSTRUCTION OF PHASE
    15             II OF THE SOUTHEASTERN PA REGIONAL
    16             EMPLOYMENT AND TRAINING CENTER             15,000,000
    17         (KK)  "AVENUE OF THE ARTS (NORTH BROAD
    18             STREET) - PHILADELPHIA PAN-HELLENIC
    19             CHAPTER'S CONFERENCE CENTER"                3,000,000
    20         (LL)  RELOCATED AFRO-AMERICAN HISTORICAL
    21             AND CULTURAL MUSEUM                        10,000,000
    22         (MM)  HISTORIC PHILADELPHIA SOUND AND LIGHT
    23             SHOW                                        7,500,000
    24         (NN)  DEVELOPMENT OF A MULTIPURPOSE HUNGER
    25             RELIEF CENTER IN THE FOOD
    26             PHILADELPHIA'S FOOD DISTRIBUTION
    27             CENTER                                        725,000
    28         (OO)  MAJOR STRUCTURAL RENOVATION TO
    29             FRANKLIN INSTITUTE SCIENCE MUSEUM
    30             INCLUDING RESTORATION AND MODERNIZATION
    19970S0188B1336                 - 123 -

     1             OF THE HISTORICALLY SIGNIFICANT 1934
     2             BUILDING AND SCIENCE EDUCATION FACILITY
     3             UPGRADES                                   30,000,000
     4         (PP)  REHABILITATION OF ROYAL THEATRE,
     5             SOUTH STREET                                1,000,000
     6         (QQ)  MOUNT AIRY REVITALIZATION PROJECT         3,000,000
     7         (RR)  GREEK ROW PROJECT, NORTH BROAD
     8             STREET                                      3,000,000
     9         (SS)  POINT REVITALIZATION PROJECT              1,000,000
    10         (TT)  BYBERRY STATE HOSPITAL SITE
    11             DEVELOPMENT                                20,000,000
    12         (UU)  DEFENSE FACILITIES SITE DEVELOPMENT      20,000,000
    13         (VV)  PENNSYLVANIA CONVENTION CENTER
    14             EXPANSION                                 200,000,000
    15         (WW)  STADIUM DEVELOPMENT/RENOVATION          200,000,000
    16         (XX)  ACQUISITION AND RENOVATIONS TO NEW
    17             FACILITIES FOR PENNSYLVANIA ACADEMY OF
    18             FINE ARTS                                   6,000,000
    19         (YY)  POINT BREEZE PERFORMING ARTS CENTER      12,500,000
    20         (ZZ)  ASSOCIATION OF LATIN AMERICAN
    21             MUSICIANS                                   2,000,000
    22         (AAA)  WEST PHILADELPHIA PARTNERS FOR ARTS     10,500,000
    23         (BBB)  PHILADELPHIA INTERNATIONAL AIRPORT -
    24             CONSTRUCTION OF NEW INTERNATIONAL
    25             TERMINAL                                   12,500,000
    26         (CCC)  CECIL B. MOORE AVENUE DEVELOPMENT
    27             BILLIE HOLLIDAY ART CENTER                  1,000,000
    28         (DDD)  YOUTH MINI-MALL                          1,000,000
    29         (EEE)  GERMANTOWN AVENUE RECONSTRUCTION
    30             (7400-7600 BLOCKS)                          2,130,000
    19970S0188B1336                 - 124 -

     1         (FFF)  GERMANTOWN AVENUE RECONSTRUCTION
     2             (5100-5500 BLOCKS)                          2,840,000
     3         (GGG)  WADSWORTH AVENUE STREETSCAPE (1500-
     4             1600 BLOCKS)                                  460,000
     5         (HHH)  CAPITAL IMPROVEMENTS TO THE ROCK
     6             SCHOOL OF PENNSYLVANIA BALLET               1,000,000
     7         (III)  60TH BUSINESS DISTRICT PROJECTS            500,000
     8         (JJJ)  RESURFACING AND REHABILITATION OF
     9             COMMERCIAL CORRIDOR LOCATED AT 60TH AND
    10             MARKET STREETS FROM SOUTH OF MARKET
    11             STREET TO CATHERINE STREET                  1,500,000
    12  (14) (36)  Pike County                                            <--
    13     (i)  Pike County Center for the Performing
    14         Arts                                            7,500,000
    15  (15) (37)  Schuylkill County                                      <--
    16     (i)  Borough of Tamaqua
    17         (A)  Improvements to Tamaqua Train Station        250,000
    18     (II)  SWEET ARROW LAKE                                         <--
    19         (A)  RESTORATION OF DAM AND SPILLWAY            1,200,000
    20     (III)  CITY OF POTTSVILLE
    21         (A)  GENERAL GEORGE JOULWAN PARK,
    22             IMPROVEMENTS TO RECREATIONAL FACILITY         200,000
    23     (IV)  ORWIGSBURG BOROUGH HISTORICAL SOCIETY
    24         (A)  BUILDING IMPROVEMENTS                         50,000
    25  (16) (38)  Somerset County                                        <--
    26     (I)  COUNTY PROJECTS                                           <--
    27         (A)  Somerset County Bicentennial
    28             Industrial Park Project                       626,000
    29     (II)  LINCOLN TOWNSHIP                                         <--
    30         (A)  SOMERSET HISTORICAL CENTER
    19970S0188B1336                 - 125 -

     1             IMPROVEMENTS                                  875,000
     2     (III)  BOROUGH OF WINDBER
     3         (A)  FABRICATION OF EXHIBITS FOR THE
     4             WINDBER COAL HERITAGE CENTER                  450,000
     5  (39)  SULLIVAN COUNTY
     6         (A)  FUNDING FOR SITE ACQUISITION AND
     7             PREPARATION FOR ARCHERY HALL OF FAME IN
     8             LAPORTE TOWNSHIP                            1,000,000
     9  (17) (40)  Warren County                                          <--
    10     (i)  Warren County Development Association
    11         (A)  Construction of an industrial facility
    12             in the Euclid Avenue Industrial Park          500,000
    13     (II)  WARREN WAR MEMORIAL FIELD                                <--
    14         (A)  REHABILITATION AND RESTORATION             2,000,000
    15  (41)  WASHINGTON COUNTY
    16     (I)  COUNTY PROJECT
    17         (A)  RENOVATIONS AND REHABILITATION TO
    18             HISTORICALLY PRESERVE FORMER PRISON
    19             FACILITY FOR USE AS MODERN OFFICE
    20             SPACE                                       3,250,000
    21         (B)  ROUTE 22 INDUSTRIAL PARK, LAND
    22             ACQUISITION AND DEVELOPMENT                24,000,000
    23         (C)  SOUTHPOINTE EXPANSION                      2,500,000
    24     (II)  UNION TOWNSHIP
    25         (A)  SEWER LINE EXTENSIONS TO SHIRE OAKS
    26             AND VILLAGE OF ELRAMA                       2,500,000
    27  (18) (42)  Westmoreland County                                    <--
    28     (i)  Rostraver                                                 <--
    29     (I)  EAST HUNTINGDON TOWNSHIP                                  <--
    30         (A)  REHABILITATION OF THE WEST OVERTON
    19970S0188B1336                 - 126 -

     1             MUSEUMS                                     5,500,000
     2     (II)  ROSTRAVER
     3         (A)  Acquisition and/or construction of a
     4             combination public library and senior
     5             citizen center                              2,000,000
     6     (III)  CITY OF MONESSEN                                        <--
     7         (A)  ACQUISITION AND RENOVATION OF BUILDING
     8             FOR EXPANSION OF MONESSEN DISTRICT
     9             LIBRARY                                     2,500,000
    10     (IV)  COUNTY PROJECT
    11         (A)  JEANNETTE INDUSTRIAL PARK,
    12             REDEVELOPMENT OF FORMER GGI GLASS
    13             PLANT                                       2,000,000
    14         (B)  WESTMORELAND DISTRIBUTION CENTER           1,500,000
    15         (C)  SOUTH GREENSBURG INDUSTRIAL CENTER         1,000,000
    16         (D)  PHASE III OF WESTMORELAND BUSINESS AND
    17             RESEARCH PARK                                 700,000
    18         (E)  RENOVATIONS OF TROUTMAN BUILDING           1,500,000
    19         (F)  DEVELOPMENT OF WESTMORELAND COUNTY
    20             AIRPORT INDUSTRIAL PARK AND RELATED
    21             INFRASTRUCTURE                              2,500,000
    22     (V)  GREENSBURG CITY
    23         (A)  CONSTRUCTION OF THE SETON HILL WOMEN'S
    24             BUSINESS CENTER                             5,000,000
    25         (B)  RENOVATION AND EXPANSION OF THE
    26             WESTMORELAND MUSEUM OF AMERICAN ART         2,000,000
    27     (VI)  CITY OF ARNOLD
    28         (A)  RIVERFRONT DEVELOPMENT IN ARNOLD             600,000
    29     (VII)  CITIES OF ARNOLD AND NEW KENSINGTON
    30         (A)  FIFTH AVENUE CORRIDOR NEIGHBORHOOD
    19970S0188B1336                 - 127 -

     1             REHABILITATION INCLUDING DEMOLITION
     2             FROM 14TH STREET TO 11TH STREET TO BE
     3             REPLACED BY LIGHT INDUSTRIAL AND
     4             HOUSING DEVELOPMENT                         6,000,000
     5         (B)  HORNE BOULEVARD DEMOLITION AND SITE
     6             DEVELOPMENT NEAR OLD A&P MARKET               400,000
     7     (VIII)  CITY OF NEW KENSINGTON
     8         (A)  ALUMINUM MUSEUM IN NEW KENSINGTON          1,000,000
     9  (19) (43)  York County                                            <--
    10     (i)  City of York
    11         (A)  Hoffman Stadium Reconstruction            10,000,000
    12         (B)  Public improvements in support of the
    13             Boundry Avenue redevelopment project        3,300,000
    14         (C)  George Street two-way conversion
    15             project                                       850,000
    16         (D)  Mural project infrastructure
    17             improvements                                1,000,000
    18         (E)  George Street gateway improvements           600,000
    19         (F)  Penn and Farquhar Park renovations           500,000
    20     (II)  RED LION                                                 <--
    21         (A)  LAND ACQUISITION AND CONSTRUCTION OF
    22             KALTREIDER LIBRARY                          2,000,000
    23  Section 7.  Itemization of flood control projects.
    24     Additional capital projects in the category of flood control
    25  projects to be constructed by the Department of Environmental
    26  Protection, its successors or assigns, and to be financed by the
    27  incurring of debt are hereby itemized, together with their
    28  respective estimated costs, as follows:
    29                                                           Total
    30                                                          Project
    19970S0188B1336                 - 128 -

     1             Project                                    Allocation
     2  (1)  Department of Environmental Protection          $25,456,000  <--
     3  (1)  DEPARTMENT OF ENVIRONMENTAL PROTECTION         $121,741,000  <--
     4     (i)  Allegheny County
     5         (A)  Additional funds for Turtle Creek
     6             Flood Control Project                         383,000
     7             (Base Project Allocation - $383,000)
     8     (II)  ARMSTRONG COUNTY                                         <--
     9         (A)  BOROUGH OF FORD CITY, FLOOD CONTROL
    10             PROJECT INCLUDING FLOODWALL                 1,000,000
    11         (B)  BOROUGH OF FORD CITY, FLOODWALL HAZARD
    12             MITIGATION PROJECT                          1,000,000
    13         (C)  NORTH BUFFALO TOWNSHIP, RAISE ROADBED
    14             OF T-314, HOGG ROAD NEAR BONNER CAMP          100,000
    15     (ii) (III)  Bedford County                                     <--
    16         (A)  Borough of Hyndman - Wills Creek
    17             Restoration Project                           373,000
    18     (iii) (IV)  Cumberland County                                  <--
    19         (A)  Borough of Carlisle Chapel Hill Storm
    20             Drainage Project                            1,000,000
    21             (Base Project Allocation - $900,000)
    22             (Design and Contingencies - $100,000)
    23         (B)  Lower Allen Township - Highland Park
    24             Drainage Project                            1,240,000
    25         (C)  Hampden Township - Floodproofing
    26             Pinebrook Wastewater Treatment Plant          300,000
    27             (Base Project Allocation - $250,000)
    28             (Design and Contingencies - $50,000)
    29     (V)  FAYETTE COUNTY                                            <--
    30         (A)  FLOOD CONTROL AND RIVERBANK EROSION
    19970S0188B1336                 - 129 -

     1             RESTORATION IN POINT MARION                   350,000
     2     (VI)  ERIE COUNTY
     3         (A)  CITY OF ERIE, FLOODPROOF WASTEWATER
     4             TREATMENT SYSTEM                            3,000,000
     5     (iv) (VII)  Greene County                                      <--
     6         (A)  Flood mitigation project in Center
     7             Township                                      157,000
     8         (B)  Flood mitigation project in Jackson
     9             Township                                      188,000
    10         (C)  Flood mitigation project in Perry
    11             Township                                      500,000
    12         (D)  Flood mitigation project in Wayne
    13             Township                                      530,000
    14     (VIII)  LACKAWANNA COUNTY                                      <--
    15         (A)  CITY OF SCRANTON, NON-FEDERAL SHARE OF
    16             $20,269,000. FLOOD CONTROL PROJECT
    17             ALONG THE LACKAWANNA RIVER BY THE U.S.
    18             ARMY CORPS OF ENGINEERS                     5,837,000
    19             (BASE PROJECT ALLOCATION - $5,837,000)
    20         (B)  CITY OF SCRANTON, RAISING OF THE
    21             ALBRIGHT STREET BRIDGE OVER THE
    22             LACKAWANNA RIVER IN THE CITY OF
    23             SCRANTON, INCLUDING, BUT NOT LIMITED
    24             TO, ROAD RECONSTRUCTION OF BRIDGES AND
    25             APPROACHES TO THE BRIDGES AND BRIDGE
    26             REHABILITATION IN CONJUNCTION WITH U.S.
    27             ARMY CORPS OF ENGINEERS FLOOD CONTROL
    28             PROJECT                                     1,200,000
    29             (BASE PROJECT ALLOCATION - $1,000,000)
    30             (DESIGN AND CONTINGENCIES - $200,000)
    19970S0188B1336                 - 130 -

     1         (C)  CITY OF SCRANTON, RAISING OF THE
     2             POPLAR STREET BRIDGE OVER THE
     3             LACKAWANNA RIVER IN THE CITY OF
     4             SCRANTON, INCLUDING, BUT NOT LIMITED
     5             TO, ROAD RECONSTRUCTION OF BRIDGES AND
     6             APPROACHES TO THE BRIDGES AND BRIDGE
     7             REHABILITATION IN CONJUNCTION WITH U.S.
     8             ARMY CORPS OF ENGINEERS FLOOD CONTROL
     9             PROJECT                                     1,420,000
    10             (BASE PROJECT ALLOCATION - $1,200,000)
    11             (DESIGN AND CONTINGENCIES - $220,000)
    12         (D)  CITY OF SCRANTON, RAISING OF THE OLIVE
    13             STREET BRIDGE OVER THE LACKAWANNA RIVER
    14             IN THE CITY OF SCRANTON, INCLUDING, BUT
    15             NOT LIMITED TO, ROAD RECONSTRUCTION OF
    16             BRIDGES AND APPROACHES TO THE BRIDGES
    17             AND BRIDGE REHABILITATION IN
    18             CONJUNCTION WITH U.S. ARMY CORPS OF
    19             ENGINEERS FLOOD CONTROL PROJECT             1,200,000
    20             (BASE PROJECT ALLOCATION - $1,000,000)
    21             (DESIGN AND CONTINGENCIES - $200,000)
    22         (E)  CITY OF SCRANTON, FLOOD CONTROL
    23             PROJECT ON UNNAMED CREEK ADJACENT TO
    24             OAKWOOD ESTATES, INCLUDING, BUT NOT
    25             LIMITED TO, RETENTION BASINS AND BOX
    26             CULVERT UNDER KEYSER AVENUE                 1,200,000
    27             (BASE PROJECT ALLOCATION - $1,000,000)
    28             (DESIGN AND CONTINGENCIES - $200,000)
    29         (F)  CITY OF SCRANTON, STORM WATER AND
    30             FLOOD CONTROL PROJECT IN HIGH WORKS
    19970S0188B1336                 - 131 -

     1             SECTION, INCLUDING, BUT NOT LIMITED TO,
     2             STORM SEWERS, ROAD RECONSTRUCTION AND
     3             PUMPING STATIONS IN THE AREA INCLUDING
     4             FERDINAND STREET, THEODORE STREET,
     5             STATION STREET, FULTON STREET, NORTH
     6             KEYSER AVENUE AND SWEENEY AVENUE            1,560,000
     7             (BASE PROJECT ALLOCATION - $1,300,000)
     8             (DESIGN AND CONTINGENCIES - $260,000)
     9         (G)  CITY OF SCRANTON, STORM WATER AND
    10             FLOOD CONTROL PROJECT, INCLUDING, BUT
    11             NOT LIMITED TO, STORM SEWERS, ROAD
    12             RECONSTRUCTION AND PUMPING STATIONS IN
    13             THE AREA INCLUDING DEWEY AVENUE,
    14             MERRIFIELD AVENUE, NORTH CAMERON
    15             AVENUE, LAFAYETTE STREET, PRICE STREET
    16             AND JACKSON STREET                          1,600,000
    17             (BASE PROJECT ALLOCATION - $1,200,000)
    18             (DESIGN AND CONTINGENCIES - $400,000)
    19         (H)  CITY OF SCRANTON, FLOOD CONTROL AND
    20             STORM WATER PROJECT, INCLUDING, BUT NOT
    21             LIMITED TO, STORM SEWERS, ROAD
    22             RECONSTRUCTION AND PUMPING STATIONS IN
    23             THE AREA, INCLUDING EAST PARKER STREET,
    24             ELK STREET, CRANE AVENUE AND BOULEVARD
    25             AVENUE                                      1,200,000
    26             (BASE PROJECT ALLOCATION - $1,000,000)
    27             (DESIGN AND CONTINGENCIES - $200,000)
    28         (I)  CITY OF SCRANTON, FLOOD CONTROL AND
    29             STORM WATER PROJECT, INCLUDING, BUT NOT
    30             LIMITED TO, STORM SEWERS AND ROAD
    19970S0188B1336                 - 132 -

     1             RECONSTRUCTION AND PUMPING STATIONS IN
     2             THE AREA OF GREEN RIDGE STREET, MARION
     3             STREET, GLEN STREET, NAY AUG AVENUE,
     4             ROSS AVENUE, GARDNER AVENUE AND
     5             ALBRIGHT AVENUE                             1,200,000
     6             (BASE PROJECT ALLOCATION - $1,000,000)
     7             (DESIGN AND CONTINGENCIES - $200,000)
     8         (J)  CITY OF SCRANTON, FLOOD CONTROL AND
     9             STORM WATER PROJECT, INCLUDING, BUT NOT
    10             LIMITED TO, STORM SEWERS AND ROAD
    11             RECONSTRUCTION AND PUMPING STATIONS IN
    12             THE PLOT SECTION                            1,920,000
    13             (BASE PROJECT ALLOCATION - $1,600,000)
    14             (DESIGN AND CONTINGENCIES - $320,000)
    15         (K)  CITY OF SCRANTON, FLOOD CONTROL AND
    16             STORM WATER PROJECT, INCLUDING, BUT NOT
    17             LIMITED TO, STORM SEWERS AND ROAD
    18             RECONSTRUCTION AND PUMPING STATIONS IN
    19             THE BULLS HEAD/WESTON FIELD SECTION         2,800,000
    20             (BASE PROJECT ALLOCATION - $2,500,000)
    21             (DESIGN AND CONTINGENCIES - $300,000)
    22         (L)  CITY OF SCRANTON, FLOOD CONTROL AND
    23             STORM WATER PROJECT, INCLUDING, BUT NOT
    24             LIMITED TO, STORM SEWERS AND ROAD
    25             RECONSTRUCTION AND PUMPING STATIONS IN
    26             THE AREA OF EAST MARKET STREET,
    27             ELECTRIC STREET, NAY AUG AVENUE, ROSS
    28             AVENUE AND ROSANNA AVENUE                   1,200,000
    29             (BASE PROJECT ALLOCATION - $1,000,000)
    30             (DESIGN AND CONTINGENCIES - $200,000)
    19970S0188B1336                 - 133 -

     1         (M)  CITY OF SCRANTON, FLOOD CONTROL AND
     2             STORM WATER PROJECT, INCLUDING, BUT NOT
     3             LIMITED TO, STORM SEWERS AND ROAD
     4             RECONSTRUCTION AND PUMPING STATIONS IN
     5             THE AREA OF THE 400 BLOCK OF LEGGETTS
     6             STREET AND ROCKWELL AVENUE                    575,000
     7             (BASE PROJECT ALLOCATION - $500,000)
     8             (DESIGN AND CONTINGENCIES - $75,000)
     9         (N)  CITY OF SCRANTON - STORM WATER AND
    10             FLOOD CONTROL PROJECT, INCLUDING, BUT
    11             NOT LIMITED TO, STORM SEWERS, ROAD
    12             RECONSTRUCTION AND PUMPING STATIONS, IN
    13             AREA KNOWN AS PARK PLACE ALONG
    14             LACKAWANNA RIVER FROM ALBRIGHT STREET
    15             BRIDGE DOWNSTREAM TO OLIVE STREET
    16             BRIDGE                                      1,800,000
    17             (BASE PROJECT ALLOCATION - $1,600,000)
    18             (DESIGN AND CONTINGENCIES - $200,000)
    19         (O)  CITY OF SCRANTON - NON-FEDERAL SHARE
    20             OF UNITED STATES ARMY CORPS OF
    21             ENGINEERS FLOOD CONTROL DESIGN PROJECT
    22             ON LACKAWANNA RIVER FOR PLOT SECTION
    23             AND NAY AUG AVENUE SECTION                    200,000
    24         (P)  CITY OF SCRANTON, FLOOD CONTROL
    25             PROJECT ALONG LACKAWANNA RIVER,
    26             INCLUDING, BUT NOT LIMITED TO,
    27             CONSTRUCTION OF LEVEES, PUMPING
    28             STATIONS AND ACQUISITION OF PROPERTIES     36,000,000
    29             (BASE PROJECT ALLOCATION - $30,000,000)
    30             (DESIGN AND CONTINGENCIES - $6,000,000)
    19970S0188B1336                 - 134 -

     1         (Q)  BOROUGH OF DUNMORE, FLOOD CONTROL AND
     2             STORM WATER PROJECT                         6,000,000
     3             (BASE PROJECT ALLOCATION - $5,000,000)
     4             (DESIGN AND CONTINGENCIES - $1,000,000)
     5         (R)  BOROUGH OF THROOP, FLOOD CONTROL AND
     6             STORM WATER PROJECT                         6,000,000
     7             (BASE PROJECT ALLOCATION - $5,000,000)
     8             (DESIGN AND CONTINGENCIES - $1,000,000)
     9         (S)  BOROUGH OF TAYLOR, FLOOD CONTROL AND
    10             STORM WATER PROJECT                         6,000,000
    11             (BASE PROJECT ALLOCATION - $5,000,000)
    12             (DESIGN AND CONTINGENCIES - $1,000,000)
    13         (T)  CITY OF SCRANTON, 1300 BLOCK OF
    14             WYOMING AVENUE, FLOOD CONTROL AND STORM
    15             WATER PROJECT, INCLUDING, BUT NOT
    16             LIMITED TO, STORM SEWERS AND ROAD
    17             RECONSTRUCTION AND PUMPING STATIONS           500,000
    18             (BASE PROJECT ALLOCATION - $420,000)
    19             (DESIGN AND CONTINGENCIES - $80,000)
    20         (U)  BOROUGH OF DUNMORE, FLOOD CONTROL AND
    21             STORM WATER PROJECT, INCLUDING, BUT NOT
    22             LIMITED TO, STORM SEWERS, SANITARY
    23             SEWERS, BACK FLOW PREVENTORS, ROAD
    24             RECONSTRUCTION AND PUMPING STATIONS IN
    25             THE AREA OF CLAY AVENUE, QUINCY AVENUE,
    26             MADISON AVENUE, JEFFERSON AVENUE AND
    27             ADAMS AVENUE; MARION STREET, GREEN
    28             RIDGE STREET AND ELECTRIC STREET            2,400,000
    29             (BASE PROJECT ALLOCATION - $2,000,000)
    30             (DESIGN AND CONTINGENCIES - $400,000)
    19970S0188B1336                 - 135 -

     1         (V)  BOROUGH OF TAYLOR, FLOOD CONTROL AND
     2             STORM WATER PROJECT, INCLUDING, BUT NOT
     3             LIMITED TO, STORM SEWERS AND ROAD
     4             RECONSTRUCTION AND PUMPING STATIONS IN
     5             THE AREA OF GREEN VIEW WEST, INCLUDING
     6             WALNUT STREET, OAK STREET, WILLIAMS
     7             STREET, AND PRINCE STREET; MACKIE LANE,
     8             VINE LANE, LAUREL LANE, CHESTER LANE
     9             AND BICHLER LANE; RINALDI DRIVE,
    10             BARBARA DRIVE; DONNY DRIVE AND ANTHONY
    11             DRIVE                                       2,400,000
    12             (BASE PROJECT ALLOCATION - $2,000,000)
    13             (DESIGN AND CONTINGENCIES - $400,000)
    14     (v) (IX)  Luzerne County                                       <--
    15         (A)  Township of Plains, Mill Creek Flood
    16             Protection Project, construction of a
    17             flood protection project along Mill
    18             Creek and its unnamed tributary             1,030,000
    19     (vi) (X)  Montgomery County                                    <--
    20         (A)  Upper Dublin Township - Construction
    21             and rehabilitation of Ardsley Drainage
    22             Channel                                     1,800,000
    23     (XI)  NORTHUMBERLAND COUNTY                                    <--
    24         (A)  MOUNT CARMEL BOROUGH, SHAMOKIN CREEK
    25             DRAINAGE FACILITY                           4,000,000
    26         (B)  MOUNT CARMEL BOROUGH, BUTTERNUT CREEK
    27             DRAINAGE FACILITY                           1,000,000
    28     (vii) (XII)  Schuylkill County                                 <--
    29         (A)  Flood control project on Wabash Creek,
    30             Walker Township and Tamaqua Borough,
    19970S0188B1336                 - 136 -

     1             involving a tunnel bypass of collapsed
     2             culvert                                    12,100,000
     3             (Base Project Allocation - $11,000,000)
     4             (Design and Contingencies - $1,100,000)
     5     (viii) (XIII)  Somerset County                                 <--
     6         (A)  Summit Township, construction of a
     7             concrete flood wall on the Summit
     8             Township side of the Casselman River
     9             across the river from the Borough of
    10             Meyersdale                                  5,000,000
    11     (XIV)  WESTMORELAND COUNTY                                     <--
    12         (A)  REHABILITATION OF GATES AND PASSIVE
    13             CONSTRUCTION OF CREEK CHANNEL FOR
    14             KEYSTONE COMMONS FLOOD CONTROL PROJECT      1,250,000
    15     (ix) (XV)  York County                                         <--
    16         (A)  Construction of flood retention
    17             basins, Dallastown Borough and York
    18             Township                                      350,000
    19         (B)  Construction of flood retention
    20             basins, Powder Mill and Tyler Run
    21             Roads                                         505,000
    22     (XVI)  CARBON COUNTY                                           <--
    23         (A)  ADDITIONAL FUNDS FOR THE CHANNEL
    24             EXCAVATION AND REMOVAL OF OBSTRUCTIONS
    25             ON AQUASHICOLA CREEK, PALMERTON
    26             BOROUGH                                       138,000
    27     (XVII)  SULLIVAN COUNTY
    28         (A)  FLOOD CONTROL PROJECT TO PREVENT
    29             RUNOFF FROM LOYALSOCK CREEK, DUSHORE
    30             BOROUGH                                       235,000
    19970S0188B1336                 - 137 -

     1  (2)  DEPARTMENT OF TRANSPORTATION                       $500,000
     2     (I)  LACKAWANNA COUNTY
     3         (A)  CITY OF SCRANTON, 1300 BLOCK OF
     4             WYOMING AVENUE FLOOD CONTROL AND STORM
     5             WATER PROJECT, INCLUDING, BUT NOT
     6             LIMITED TO, STORM SEWERS AND ROAD
     7             RECONSTRUCTION AND PUMPING STATIONS           500,000
     8             (BASE PROJECT ALLOCATION - $420,000)
     9             (DESIGN AND CONTINGENCIES - $80,000)
    10  Section 8.  Itemization of Keystone Recreation, Park and
    11                 Conservation Projects.
    12     Projects in the category of Keystone Recreation, Park and
    13  Conservation projects to be constructed by the Department of
    14  Conservation and Natural Resources, its successors or assigns,
    15  and to be financed by the incurring of debt and/or current
    16  revenues, are hereby itemized, together with their respective
    17  estimated costs, as follows:
    18                                                           Total
    19                                                          Project
    20             Project                                    Allocation
    21  (1)  Department of Conservation and Natural                       <--
    22     Resources                                         $15,150,000
    23  (1)  DEPARTMENT OF CONSERVATION AND NATURAL                       <--
    24     RESOURCES                                         $34,542,000
    25     (i)  Bald Eagle State Park
    26         (A)  Renovation of the sewage treatment
    27             plant and collection system                   600,000
    28     (ii)  Forest District 12
    29         (A)  Rehabilitate 30 miles of Pine Creek
    30             Trail                                       1,250,000
    19970S0188B1336                 - 138 -

     1         (B)  Rehabilitate Colton Point Road             1,200,000  <--
     2     (III)  FOREST DISTRICT 16                                      <--
     3         (A)  REHABILITATE COLTON POINT ROAD             1,200,000
     4     (iii) (IV)  Gifford Pinchot State Park                         <--
     5         (A)  Renovation of the sewage treatment
     6             plant and collection system                   800,000
     7         (B)  Rehabilitation of comfort stations,
     8             children's play areas, parking and
     9             access areas                                  750,000
    10             (Base Project Allocation - $750,000)
    11     (iv) (V)  Kings Gap Environmental Education                    <--
    12         Center
    13         (A)  Replacement of interior plumbing and
    14             upgrade electrical and heating systems        700,000
    15     (v) (VI)  Ryerson Station State Park                           <--
    16         (A)  Rehabilitate swimming pool                   700,000
    17     (vi) (VII)  Worlds End State Park                              <--
    18         (A)  Construct new sewage treatment plant
    19             and collection system                         500,000
    20     (vii) (VIII)  Lackawanna State Park                            <--
    21         (A)  Park improvements                            225,000
    22     (viii)  Thornhurst State Park                                  <--
    23     (IX)  THORNHURST STATE PICNIC AREA                             <--
    24         (A)  Park improvements                            150,000
    25     (ix) (X)  Ricketts Glen State Park                             <--
    26         (A)  Construction of new park office and
    27             demolition and clearance of existing
    28             site                                          750,000
    29             (Base Project Allocation - $750,000)
    30     (XI)  PRESQUE ISLE STATE PARK                                  <--
    19970S0188B1336                 - 139 -

     1         (A)  OFFICE REHABILITATION AND EXPANSION          850,000
     2     (x) (XII)  Allegheny County                                    <--
     3         (A)  Dormont Borough, Beggs Snyder Park
     4             Improvements                                   50,000
     5     (XIII)  BEAVER COUNTY                                          <--
     6         (A)  CONSTRUCTION OF BRIDGEWATER -
     7             ROCHESTER PEDESTRIAN LINK                      50,000
     8         (B)  COMPLETION OF DESIGN AND ENGINEERING
     9             FOR BOROUGH OF BEAVER RIVERFRONT
    10             ACCESS, PARK AND MARINA                        40,000
    11         (C)  CONSTRUCTION OF BEAVER - BRIDGEWATER
    12             PEDESTRIAN LINK                                25,000
    13         (D)  REHABILITATION OF ROCHESTER DOCK AND
    14             BOAT ACCESS                                   200,000
    15         (E)  RIVERFRONT PROPERTY ACQUISITIONS           2,000,000
    16         (F)  INTERPRETIVE RIVER TRAIL SYSTEM              250,000
    17         (G)  BRIDGEWATER BICENTENNIAL PARK
    18             EXTENSION AND BANK STABILIZATION               50,000
    19     (xi) (XIV)  Bucks County                                       <--
    20         (A)  Acquisition of 167 acres designated as
    21             a working "historic airfield"               1,500,000
    22     (xii) (XV)  Butler County                                      <--
    23         (A)  Alameda Park, renovation of pool             600,000
    24         (B)  CITY OF BUTLER, POOL RENOVATIONS             185,000  <--
    25         (C)  BUTLER TOWNSHIP, REPLACEMENT OF
    26             RECREATION CENTER BUILDING AND
    27             CONSTRUCTION OF FOUR PAVILIONS AT
    28             TOWNSHIP PARK                                 430,000
    29         (D)  BUTLER COUNTY PARKS AND RECREATION
    30             COMMISSION, RENOVATION OF ALAMEDA POOL        175,000
    19970S0188B1336                 - 140 -

     1         (E)  BUTLER COMMUNITY COLLEGE, RENOVATION
     2             OF EXISTING BASEBALL FIELD,
     3             CONSTRUCTION OF NEW BALL FIELD AND
     4             JOGGING TRAIL AND RENOVATION OF TWO
     5             TENNIS COURTS                                 290,000
     6     (XVI)  CAMBRIA COUNTY
     7         (A)  REHABILITATION OF HIGHLAND REGIONAL
     8             PARK/HIGHLAND FIELD                            51,000
     9     (XVII)  CUMBERLAND COUNTY
    10         (A)  SHIPPENSBURG TOWNSHIP, PARK AND SPORTS
    11             FACILITIES INCLUDING BASEBALL AND
    12             SOCCER FIELDS, SKATING FACILITIES,
    13             PAVILION AND PICNIC FACILITY, JOGGING
    14             AND BIKING TRAILS AND PARKING
    15             FACILITIES                                    275,000
    16     (XVIII)  ELK COUNTY
    17         (A)  ELK HABITAT EDUCATION LOCATED IN
    18             BENEZETTE TOWNSHIP                          1,000,000
    19     (XIX)  FAYETTE COUNTY
    20         (A)  RAIL BED ACQUISITION FOR A SHEEPKIN
    21             TRAIL COUNCIL BICYCLE TRAIL                   120,000
    22     (XX)  GREENE COUNTY
    23         (A)  MONONGAHELA RIVER TRAIL LAND
    24             ACQUISITION AND DEVELOPMENT ALONG STEEL
    25             HERITAGE ROUTE                              2,000,000
    26     (xiii) (XXI)  Lackawanna County                                <--
    27         (A)  Borough of Moosic, park and
    28             playground                                    200,000
    29         (B)  Borough of Moscow, park and
    30             playground                                    100,000
    19970S0188B1336                 - 141 -

     1         (C)  Greenfield Township, park and
     2             playground                                     50,000
     3         (D)  Newton Township, baseball park at
     4             three sites                                   500,000
     5         (E)  Newton Township, park and playground          50,000
     6         (F)  South Abington Township, park and
     7             playground                                    200,000
     8         (G)  CITY OF SCRANTON, TRIPP PARK CIVIC                    <--
     9             ASSOCIATION COMMUNITY CENTER,
    10             INCLUDING, BUT NOT LIMITED TO,
    11             BUILDING, EQUIPMENT AND LANDSCAPING            25,000
    12         (H)  CITY OF SCRANTON, CONSTRUCTION OF
    13             FIELD HOUSE AT TONY BARLETTA FIELD             36,000
    14             (BASE PROJECT ALLOCATION - $30,000)
    15             (DESIGN AND CONTINGENCIES - $6,000)
    16         (I)  CITY OF SCRANTON, PURCHASE OF
    17             BLEACHERS, PLAYERS' BENCHES, FIELD
    18             MAINTENANCE EQUIPMENT AND OPEN AIR
    19             PAVILION AT TONY BARLETTA FIELD                18,000
    20         (J)  CITY OF SCRANTON, PURCHASE OF
    21             BLEACHERS, PLAYERS' BENCHES AND FIELD
    22             MAINTENANCE EQUIPMENT TO BE USED AT
    23             RECREATIONAL FACILITIES LOCATED IN THE
    24             CITY OF SCRANTON                               25,000
    25         (K)  CITY OF SCRANTON, CONSTRUCTION OF
    26             GRANDSTAND, REHABILITATION OF DUGOUTS
    27             AND FENCE REPLACEMENT AT FREDDY
    28             BATTAGLIA FIELD                                20,000
    29         (L)  CITY OF SCRANTON, REHABILITATION OF
    30             NAY AUG PARK, INCLUDING, BUT NOT
    19970S0188B1336                 - 142 -

     1             LIMITED TO, BUILDINGS, PAVILIONS, ROAD
     2             RESURFACING, PARKING FACILITIES,
     3             REHABILITATION OF SWIMMING FACILITIES
     4             AND REHABILITATION OF EVERHART MUSEUM       3,600,000
     5             (BASE PROJECT ALLOCATION - $3,000,000)
     6             (DESIGN AND CONTINGENCIES - $600,000)
     7         (M)  CITY OF SCRANTON, REHABILITATION OF
     8             EXISTING SWIMMING POOLS, INCLUDING, BUT
     9             NOT LIMITED TO, BATHHOUSE FACILITIES
    10             AND FILTER ROOMS                            1,200,000
    11             (BASE PROJECT ALLOCATION - $1,000,000)
    12             (DESIGN AND CONTINGENCIES - $200,000)
    13         (N)  BOROUGH OF THROOP, BALLPARK AND
    14             RECREATION SITE                                30,000
    15             (BASE PROJECT ALLOCATION - $25,000)
    16             (DESIGN AND CONTINGENCIES - $5,000)
    17         (O)  CITY OF SCRANTON, NAY AUG GORGE ACCESS
    18             AND SAFETY IMPROVEMENTS                       350,000
    19         (P)  BOROUGH OF CLARKS SUMMIT, RENOVATION
    20         OF PROPERTY AND PURCHASE OF EQUIPMENT FOR
    21         PLANNED RECREATION AREA                           100,000
    22     (xiv) (XXII)  Lehigh County                                    <--
    23         (A)  City of Allentown, renovations to
    24             Bicentennial Park                             750,000
    25     (xv) (XXIII)  Luzerne County                                   <--
    26         (A)  Susquehanna River Trail, construction
    27             of trail along a corridor of railway
    28             owned by the Luzerne County Rail
    29             Corporation from Borough of Duryea to
    30             City of Wilkes-Barre                          300,000
    19970S0188B1336                 - 143 -

     1     (xvi) (XXIV)  Northampton County                               <--
     2         (A)  City of Bethlehem, nonstructural
     3             renovation of downtown pedestrian
     4             plaza/park area                               750,000
     5     (XXV)  PHILADELPHIA COUNTY                                     <--
     6         (A)  RENOVATION OF MORRIS PARK                    667,000
     7         (B)  RENOVATION OF HADDINGTON RECREATION
     8             CENTER                                        667,000
     9         (C)  RENOVATION OF TUSTIN RECREATION
    10             CENTER                                        667,000
    11         (D)  TENROSE PLAYGROUND, IMPROVEMENTS TO
    12             BUILDING                                      500,000
    13     (XXVI)  WASHINGTON COUNTY
    14         (A)  RENOVATION OF MAIN PAVILION FOR
    15             GREATER WASHINGTON PARK COMMISSION            100,000
    16         (B)  CANONSBURG PARK BOARD                        246,000
    17     (xvii) (XXVII)  York County                                    <--
    18         (A)  Heritage Rail/Trail, development of
    19             ten miles of trail and associated
    20             improvements                                1,625,000
    21     (xviii)  Presque Isle State Park                               <--
    22         (A)  Office rehabilitation and expansion          850,000
    23     (XXVIII)  RACCOON CREEK STATE PARK                             <--
    24         (A)  REHABILITATION OF GROUP CAMP NO. 2-3       2,000,000
    25         (B)  RENOVATION OF MAIN PICNIC AREA, VALLEY
    26             PICNIC AREA AND ROAD SYSTEM                 2,000,000
    27  (2)  DEPARTMENT OF COMMUNITY AND ECONOMIC
    28     DEVELOPMENT                                           $38,000
    29     (I)  SHAWNEE PARK FIELD, CITY OF MONESSEN,
    30         WESTMORELAND COUNTY
    19970S0188B1336                 - 144 -

     1         (A)  ERECTION OF LIGHTS                            38,000
     2             (BASE PROJECT ALLOCATION - $30,000)
     3             (DESIGN AND CONTINGENCIES - $8,000)
     4  Section 9.  Itemization of Pennsylvania Game Commission Capital
     5                 Projects.
     6     The individual capital projects in the category of public
     7  improvement projects to be acquired by the Pennsylvania Game
     8  Commission and to be financed from current revenues of the Game
     9  Fund pursuant to executive authorizations are hereby itemized,
    10  together with their respective estimated costs, as follows:
    11                                                           Total
    12                                                          Project
    13             Project                                    Allocation
    14  (1)  Pennsylvania Game Commission                     $5,000,000
    15     (i)  Upgrade FM radio system for all western
    16         regions including construction of towers,
    17         shelters and antennae and the acquisition
    18         of microwave equipment, base stations,
    19         consoles and other equipment necessary to
    20         achieve a communication system fully
    21         compatible with future 800 MHz Statewide
    22         system                                          5,000,000
    23  Section 10.  Itemization of Pennsylvania Fish and Boat
    24                 Commission Capital Projects.
    25     (A)  PROJECTS TO BE FINANCED FROM CURRENT REVENUES.--The       <--
    26  individual capital projects in the category of public
    27  improvement projects to be developed by the Pennsylvania Fish
    28  and Boat Commission and to be financed from current revenues of
    29  the Fish Fund and the Boat Fund pursuant to executive
    30  authorizations are hereby itemized, together with their
    19970S0188B1336                 - 145 -

     1  respective estimated costs, as follows:
     2                                                           Total
     3                                                          Project
     4             Project                                    Allocation
     5  (1)  Pennsylvania Fish and Boat Commission            $6,380,000  <--
     6  (1)  PENNSYLVANIA FISH AND BOAT COMMISSION           $10,080,000  <--
     7     (i)  Beaver County
     8         (A)  Development of a boating access area
     9             in Monaca Borough                             200,000
    10             (Base Project Allocation - $200,000)
    11     (ii)  Crawford County
    12         (A)  Acquisition and renovation of a
    13             Northeast Law Enforcement Office and
    14             associated regional Fish and Boat
    15             Commission office facilities and
    16             installation of boat storage, parking
    17             and associated facilities in Vernon
    18             Township                                      180,000
    19             (Base Project Allocation - $180,000)
    20     (iii)  Erie County
    21         (A)  Shades Beach Park Development              6,000,000
    22     (IV)  WESTMORELAND COUNTY                                      <--
    23         (A)  CONSTRUCTION OF A BOAT ACCESS AT THE
    24             MONESSEN RIVERFRONT IN THE CITY OF
    25             MONESSEN                                      200,000
    26     (B)  SUPPLEMENTAL AUTHORIZATION.--THE AMOUNTS AUTHORIZED FOR
    27  EXPENDITURE FROM THE FISH FUND AND THE BOAT FUND UNDER SECTIONS
    28  9, 10 AND 11 OF THE ACT OF DECEMBER 28, 1992 (P.L.1694, NO.188),
    29  KNOWN AS THE CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 1991-
    30  1992, ARE SUPPLEMENTED AS FOLLOWS:
    19970S0188B1336                 - 146 -

     1                                                           TOTAL
     2                                                          PROJECT
     3             PROJECT                                    ALLOCATION
     4  (1)  DAUPHIN COUNTY
     5     (I)  ADMINISTRATIVE HEADQUARTERS
     6         (A)  ACQUISITION OR CONSTRUCTION OF
     7             ADMINISTRATIVE AND RELATED FACILITIES,
     8             INCLUDING ADMINISTRATIVE HEADQUARTERS,
     9             AQUATIC RESOURCE EDUCATION CENTER,
    10             WAREHOUSE, TRAINING AND RELATED
    11             FACILITIES ON COMMISSION-OWNED
    12             PROPERTY                                    3,000,000
    13             (FISH FUND - $2,250,000)
    14             (BOAT FUND - $750,000)
    15             (BASE CONSTRUCTION AUTHORIZATION
    16             SUPPLEMENT - $2,500,000)
    17             (DESIGN AND CONTINGENCIES SUPPLEMENT -
    18             $500,000)
    19         (B)  ORIGINAL FURNITURE AND EQUIPMENT             500,000
    20             (FISH FUND - $375,000)
    21             (BOAT FUND - $125,000)
    22         (C)  IN ADDITION TO THE METHODS BY WHICH
    23             THE PENNSYLVANIA FISH AND BOAT
    24             COMMISSION WAS AUTHORIZED TO CONSTRUCT
    25             THE FACILITY DESCRIBED IN THIS
    26             SUBSECTION UNDER SECTION 11 OF THE ACT
    27             OF DECEMBER 28, 1992 (P.L.1694,
    28             NO.188), KNOWN AS THE CAPITAL BUDGET
    29             PROJECT ITEMIZATION ACT OF 1991-1992,
    30             THE COMMISSION IS HEREBY AUTHORIZED TO
    19970S0188B1336                 - 147 -

     1             FUND ALL OR PART OF THE PUBLIC
     2             IMPROVEMENT PROJECT DESCRIBED IN THIS
     3             SUBSECTION WITH FUNDS AUTHORIZED UNDER
     4             SECTIONS 14, 15, 16 AND 17 OF THIS ACT,
     5             PROVIDED THAT THE COMMISSION RECEIVES
     6             EXECUTIVE APPROVAL AND AUTHORIZATION TO
     7             EXPEND SUCH FUNDS AND FURTHER PROVIDED
     8             THAT THE FISH FUND AND BOAT FUND SHALL
     9             REPAY THE PRINCIPAL AND INTEREST OF THE
    10             FUNDS EXPENDED HEREUNDER.
    11  Section 11.  Restriction on certain funds.
    12     The new and additional funds provided for DGS 948-37, the
    13  expansion of central air conditioning system to the Main Capitol
    14  Building, DGS 948-35, the fire safety code improvements to the
    15  Capitol Complex specifically relating to the Capitol Building
    16  and the repair and renovation of the Capitol Complex, itemized
    17  in section 3(7)(i)(B), (C) and (E), shall only be disbursed upon
    18  the written approval of both the Chief Clerk of the Senate and
    19  the Chief Clerk of the House of Representatives. The new and
    20  additional funds provided for DGS 948-35, the fire safety code
    21  improvements relating to the North Office Building shall only be
    22  disbursed upon the written approval of the Chief Clerk of the
    23  Senate. The new and additional funds provided for DGS 948-35,
    24  the fire safety code improvements relating to the South Office
    25  Building and DGS 946-2, renovation and conversion of the Old
    26  Museum Building for legislative offices shall only be disbursed
    27  upon the written approval of the Chief Clerk of the House of
    28  Representatives.
    29  Section 12.  Limited waiver of local requirements.
    30     (a)  Waivers for current itemizations.--The limitation on
    19970S0188B1336                 - 148 -

     1  Department of Transportation funding of capital projects under
     2  74 Pa.C.S. § 1302(4) (relating to program authorizations) shall
     3  be totally waived for the capital projects in the category of
     4  transportation assistance projects for mass transit contained in
     5  section 5(a)(9)(iii), (vii) and (viii), (10)(i), 5(A)(15)(V),     <--
     6  (VI), (VII), (XIV), (XV) AND (XVII), (16)(I) (ii), (iii),
     7  (xiii), (xiv) and (xv) and (14)(i) (21)(I).                       <--
     8     (b)  Waiver for 1992 itemization.--
     9         (1)  Notwithstanding any provision to the contrary, there
    10     shall be no local match funding requirement for phases I and
    11     II of the National magnetic levitation prototype proposal and
    12     development, as described in section 5(b)(15)(i)(B) of the
    13     act of December 28, 1992 (P.L.1694, No.188), known as the
    14     Capital Budget Project Itemization Act of 1991-1992.
    15         (2)  The Department of Transportation shall select a
    16     contractor for the project described in section
    17     5(b)(15)(i)(B) of the Capital Budget Project Itemization Act
    18     of 1991-1992. Such selection shall be based on the following
    19     criteria; the contractor must have extensive knowledge of
    20     magnetic levitation technology and have been incorporated in
    21     this Commonwealth for at least six years for the express
    22     purpose of developing magnetic levitation technology. The
    23     contractor must also have demonstrated an ability to attract
    24     multimodal private sector investment, including corporate and
    25     labor support, with participation of a major U.S. passenger
    26     airline company. The contractor must also have demonstrated
    27     an ability to obtain Federal, State and local funding for
    28     magnetic levitation development.
    29  Section 13.  Use of existing funds.                               <--
    30     (a)  Public improvements.--Of the $1,773,210,000 which is
    19970S0188B1336                 - 149 -

     1  authorized for the acquisition or construction of public
     2  improvement projects under section 3, the sum of $25,540,000
     3  shall be provided from excess funds available in the unallocated
     4  reserves of the Capital Facilities Fund from previous public
     5  improvement appropriations for projects for additional funding
     6  itemized in section 3.
     7     (b)  Furniture and equipment.--Of the $52,677,000 which is
     8  authorized for the purchase of original movable furniture and
     9  equipment for the projects which are included in section 4, the
    10  sum of $115,000 shall be provided from excess funds available in
    11  the unallocated reserves of the Capital Facilities Fund from
    12  previous furniture and equipment appropriations for projects for
    13  additional funding itemized in section 4.
    14  SECTION 13.  (RESERVED)                                           <--
    15  Section 14.  Debt authorization.
    16     (a)  Public improvements.--The Governor, Auditor General and
    17  State Treasurer are hereby authorized and directed to borrow
    18  from time to time in addition to any authorization heretofore or
    19  hereafter enacted, on the credit of the Commonwealth, subject to
    20  the limitations provided in the current capital budget, money
    21  not exceeding in the aggregate the sum of $1,747,670,000          <--
    22  $2,139,205,000 as may be found necessary to carry out the
    23  acquisition and construction of the public improvement projects
    24  specifically itemized in a capital budget.
    25     (b)  Furniture and equipment.--The Governor, Auditor General
    26  and State Treasurer are hereby authorized and directed to borrow
    27  from time to time in addition to any authorization heretofore or
    28  hereafter enacted, on the credit of the Commonwealth, subject to
    29  the limitations provided in the current capital budget, money
    30  not exceeding in the aggregate the sum of $52,562,000             <--
    19970S0188B1336                 - 150 -

     1  $56,390,000 as may be found necessary to carry out the public
     2  improvement projects consisting of the acquisition of original
     3  movable furniture and equipment specifically itemized in a
     4  capital budget.
     5     (c)  Transportation assistance.--The Governor, Auditor
     6  General and State Treasurer are hereby authorized and directed
     7  to borrow from time to time in addition to any authorization
     8  heretofore or hereafter enacted, on the credit of the
     9  Commonwealth, subject to the limitations provided in the current
    10  capital budget, money not exceeding in the aggregate the sum of
    11  $540,881,000 $942,866,000 as may be found necessary to carry out  <--
    12  the acquisition and construction of the transportation
    13  assistance projects specifically itemized in a capital budget.
    14     (d)  Redevelopment assistance.--Subject to the limitation in
    15  section 1616.1-B(b) of the act of April 9, 1929 (P.L.343,
    16  No.176), known as The Fiscal Code, the Governor, Auditor General
    17  and State Treasurer are hereby authorized and directed to borrow
    18  from time to time in addition to any authorization heretofore or
    19  hereafter enacted, on the credit of the Commonwealth, subject to
    20  the limitations provided in the current capital budget, money
    21  not exceeding in the aggregate the sum of $1,012,098,000          <--
    22  $2,414,531,000 as may be found necessary to carry out the
    23  redevelopment assistance and the redevelopment capital
    24  assistance projects specifically itemized in a capital budget.
    25     (e)  Flood control.--The Governor, Auditor General and State
    26  Treasurer are hereby authorized and directed to borrow from time
    27  to time in addition to any authorization heretofore or hereafter
    28  enacted, on the credit of the Commonwealth, subject to the
    29  limitations provided in the current capital budget, money not
    30  exceeding in the aggregate the sum of $25,456,000 $122,241,000    <--
    19970S0188B1336                 - 151 -

     1  as may be found necessary to carry out the acquisition and
     2  construction of the flood control projects specifically itemized
     3  in a capital budget.
     4  Section 15.  Issue of bonds.
     5     The indebtedness authorized in this act shall be incurred,
     6  from time to time, and shall be evidenced by one or more series
     7  of general obligation bonds of the Commonwealth in such
     8  aggregate principal amount for each series as the Governor, the
     9  Auditor General and the State Treasurer shall determine, but the
    10  latest stated maturity date shall not exceed the estimated
    11  useful life of the projects being financed as stated in section
    12  16.
    13  Section 16.  Estimated useful life and term of debt.
    14     (a)  Estimated useful life.--The General Assembly states that
    15  the estimated useful life of the public improvement projects
    16  itemized in this act is as follows:
    17         (1)  Public improvement projects, 30 years.
    18         (2)  Furniture and equipment projects, 10 years.
    19         (3)  Transportation assistance projects:
    20             (i)  Rolling stock, 15 years.
    21             (ii)  Passenger buses, 12 years.
    22             (iii)  Furniture and equipment, 10 years.
    23             (iv)  All others, 30 years.
    24     (b)  Term of debt.--The maximum term of the debt authorized
    25  to be incurred under this act is 30 years.
    26  Section 17.  Appropriations.
    27     (a)  Public improvements.--The net proceeds of the sale of
    28  the obligations authorized in this act are hereby appropriated
    29  from the Capital Facilities Fund to the Department of General
    30  Services in the maximum amount of $1,747,670,000 $2,139,205,000   <--
    19970S0188B1336                 - 152 -

     1  to be used by it exclusively to defray the financial cost of the
     2  public improvement projects specifically itemized in a capital
     3  budget. After reserving or paying the expenses of the sale of
     4  the obligation, the State Treasurer shall pay to the Department
     5  of General Services the moneys as required and certified by it
     6  to be legally due and payable.
     7     (b)  Furniture and equipment.--The net proceeds of the sale
     8  of the obligations authorized in this act are hereby
     9  appropriated from the Capital Facilities Fund to the Department
    10  of General Services in the maximum amount of $52,562,000          <--
    11  $56,390,000 to be used by it exclusively to defray the financial
    12  cost of the public improvement projects consisting of the
    13  acquisition of original movable furniture and equipment
    14  specifically itemized in a capital budget. After reserving or
    15  paying the expenses of the sale of the obligation, the State
    16  Treasurer shall pay to the Department of General Services the
    17  moneys as required and certified by it to be legally due and
    18  payable.
    19     (c)  Transportation assistance.--The net proceeds of the sale
    20  of the obligations authorized in this act are hereby
    21  appropriated from the Capital Facilities Fund to the Department
    22  of Transportation in the maximum amount of $540,881,000           <--
    23  $942,866,000 to be used by it exclusively to defray the
    24  financial cost of the transportation assistance projects
    25  specifically itemized in a capital budget. After reserving or
    26  paying the expense of the sale of the obligation, the State
    27  Treasurer shall pay to the Department of Transportation the
    28  moneys as required and certified by it to be legally due and
    29  payable.
    30     (d)  Redevelopment assistance.--The net proceeds of the sale
    19970S0188B1336                 - 153 -

     1  of the obligations authorized in this act are hereby
     2  appropriated from the Capital Facilities Fund to the Department
     3  of Community and Economic Development in the maximum amount of
     4  $1,012,098,000 $2,414,531,000 to be used by it exclusively to     <--
     5  defray the financial cost of the redevelopment assistance and
     6  redevelopment capital assistance projects specifically itemized
     7  in a capital budget. After reserving or paying the expenses of
     8  the sale of the obligation, the State Treasurer shall pay to the
     9  Department of Community and Economic Development the moneys as
    10  required and certified by it to be legally due and payable.
    11     (e)  Flood control.--The net proceeds of the sale of the
    12  obligations authorized in this act are hereby appropriated from
    13  the Capital Facilities Fund to the Department of Environmental
    14  Protection in the maximum amount of $25,456,000 $122,241,000 to   <--
    15  be used by it exclusively to defray the financial cost of the
    16  flood control projects specifically itemized in a capital
    17  budget. After reserving or paying the expense of the sale of the
    18  obligation, the State Treasurer shall pay to the Department of
    19  Environmental Protection the moneys as required and certified by
    20  it to be legally due and payable.
    21  Section 18.  Federal funds.
    22     In addition to those funds appropriated in section 17, all     <--
    23  moneys received from the Federal Government for the projects
    24  specifically itemized in this act are also hereby appropriated
    25  for those projects.
    26     (A)  PROJECTS ITEMIZED IN THIS ACT.--IN ADDITION TO THOSE      <--
    27  FUNDS APPROPRIATED IN SECTION 17, ALL MONEYS RECEIVED FROM THE
    28  FEDERAL GOVERNMENT FOR THE PROJECTS SPECIFICALLY ITEMIZED IN
    29  THIS ACT ARE ALSO HEREBY APPROPRIATED FOR THOSE PROJECTS.
    30     (B)  PROJECTS NOT REQUIRING ITEMIZATION.--DEPARTMENT OF
    19970S0188B1336                 - 154 -

     1  MILITARY AND VETERANS AFFAIRS CONSTRUCTION PROJECTS WHICH ARE
     2  TOTALLY FEDERALLY FUNDED BUT WHICH ARE TO BE ADMINISTERED BY THE
     3  DEPARTMENT OF GENERAL SERVICES ARE HEREBY AUTHORIZED.
     4     (C)  PROJECTS TO BE COMPLETED WITH FEDERAL FUNDS ONLY.--
     5  FEDERAL FUNDS IN THE AMOUNT OF $14,501,000 ARE AUTHORIZED FOR
     6  THE CONSTRUCTION OF A BARRACKS COMPLEX IN LEBANON COUNTY FOR THE
     7  DEPARTMENT OF MILITARY AND VETERANS AFFAIRS. FEDERAL FUNDS IN
     8  THE AMOUNT OF $3,516,000 ARE AUTHORIZED FOR THE CONSTRUCTION OF
     9  A REGIONAL MAINTENANCE FACILITY IN SCRANTON, LACKAWANNA COUNTY
    10  FOR THE DEPARTMENT OF MILITARY AND VETERANS AFFAIRS.
    11  Section 19.  Prioritization of public improvement projects.
    12     The public improvement projects authorized in this act shall
    13  be prioritized by the Department of General Services in such
    14  manner as to ensure that at least 25% of the total financial
    15  cost of public improvement projects approved for design and/or
    16  construction in any one fiscal year shall be for new
    17  construction projects and at least 25% of the total financial
    18  cost of public improvement projects approved for design and/or
    19  construction in any one fiscal year shall be for the major
    20  renovation and retrofit of existing facilities.
    21  Section 20.  Expiration of authorization and appropriation.
    22     The authorization and appropriation for the additional
    23  capital projects itemized in sections 3, 4, 5, 6, 7, 8, 9 and 10
    24  for which construction contracts have not been executed within
    25  four years of the effective date of this act shall expire upon
    26  such date and shall be considered repealed. The Secretary of the
    27  Budget may extend an expired project for up to one year upon
    28  written notification of the majority chairman and minority
    29  chairman of the Appropriations Committee of the Senate and the
    30  majority chairman and minority chairman of the Appropriations
    19970S0188B1336                 - 155 -

     1  Committee of the House of Representatives. Upon expiration of
     2  the extension period, an extended project may not be
     3  subsequently extended.
     4  Section 21.  Special contract provisions.
     5     Notwithstanding any provisions of law to the contrary, the
     6  Department of General Services may, to facilitate project
     7  management, conflict resolution and timely project completion
     8  contract for construction management services for the
     9  construction of a 500-cell maximum security juvenile detention
    10  facility to be located in Western Pennsylvania, to be known as
    11  the State Correction Facility at Indiana for Juvenile Offenders,
    12  for the construction of the 1,000-cell medium security facility
    13  in Forest County, and for the construction of a 1,236-cell
    14  close-security facility in Western Pennsylvania.
    15  Section 22.  Coordination.
    16     The program provided for in section 3(14)(iv)(A) and (B)
    17  shall be developed in conjunction with the project referenced in
    18  section 5(b)(15)(i)(B) of the act of December 28, 1992
    19  (P.L.1694, No.188), known as the Capital Budget Project
    20  Itemization Act of 1991-1992, subject to the conditions set
    21  forth in the act of July 2, 1993 (P.L.134, No.31), known as the
    22  Capital Budget Act of 1993-1994.
    23  SECTION 23.  DELEGATION AND EXEMPTION OF PUBLIC IMPROVEMENT       <--
    24                 PROJECTS.
    25     FOR THE PUBLIC IMPROVEMENT PROJECTS SPECIFICALLY ITEMIZED IN
    26  SECTION 3(14)(XIII) AND SECTION 3(9)(II) OF THE ACT OF JUNE 2,
    27  1993 (P.L.265, NO.47), KNOWN AS THE CAPITAL BUDGET PROJECT
    28  ITEMIZATION ACT OF 1993-1994, THE DEPARTMENT OF GENERAL SERVICES
    29  SHALL, WITHIN 60 DAYS OF THE EFFECTIVE DATE OF THIS ACT,
    30  DELEGATE THE AUTHORITY TO CONSTRUCT, IMPROVE, EQUIP, FURNISH,
    19970S0188B1336                 - 156 -

     1  MAINTAIN, ACQUIRE OR OPERATE SUCH PROJECTS TO THE PHILADELPHIA
     2  REGIONAL PORT AUTHORITY. NOTWITHSTANDING ANY PROVISION OF LAW TO
     3  THE CONTRARY, THE PHILADELPHIA REGIONAL PORT AUTHORITY, AT ITS
     4  DISCRETION AND SUBSEQUENT TO THE AFOREMENTIONED DELEGATION, MAY
     5  CONTRACT WITH ONE OR MORE OF THE TENANT COMPANIES LEASING OR
     6  OPERATING PORT FACILITIES AT THE PORT OF PHILADELPHIA FOR THE
     7  PURPOSE OF CONSTRUCTING, IMPROVING, EQUIPPING, FURNISHING,
     8  MAINTAINING, ACQUIRING OR OPERATING THE PUBLIC IMPROVEMENT
     9  PROJECTS SPECIFICALLY ITEMIZED IN SECTION 3(14)(XIII) AND
    10  SECTION 3(9)(II) OF THE CAPITAL BUDGET PROJECT ITEMIZATION ACT
    11  OF 1993-1994. IN ADDITION, THE PROJECTS CONTAINED IN SECTION
    12  3(14)(XIII) AND SECTION 3(9)(II) OF THE CAPITAL BUDGET PROJECT
    13  ITEMIZATION ACT FOR 1993-1994 SHALL BE EXEMPT FROM THE FIRST
    14  PARAGRAPH OF SECTION 1 OF THE ACT OF MAY 1, 1913 (P.L.155,
    15  NO.104), ENTITLED "AN ACT REGULATING THE LETTING OF CERTAIN
    16  CONTRACTS FOR THE ERECTION, CONSTRUCTION, AND ALTERATION OF
    17  PUBLIC BUILDINGS," THE PROVISIONS OF THE ACT OF MARCH 3, 1978
    18  (P.L.6, NO.3), KNOWN AS THE STEEL PRODUCTS PROCUREMENT ACT, AND
    19  ANY PROVISIONS OF LAW REQUIRING THE BIDDING OF PROJECTS.
    20  Section 23 24.  Repeals.                                          <--
    21     The following acts and parts of acts are repealed:
    22     Section 3(1)(i)(A) and (12)(ii)(A) of the act of July 10,
    23  1986 (P.L.1285, No.118), known as the Capital Budget Project
    24  Itemization Act for 1984-1985.
    25     Section 3(3)(v)(A)(vi) AND (5)(CLIX)(B) AND (C) of the act of  <--
    26  October 21, 1988 (P.L.851, No.113), known as the Capital Budget
    27  Project Itemization Act for 1987-1988.
    28     Sections 3(4)(ii)(A)(II) and 6(1)(iii)(A) of the act of
    29  December 28, 1992 (P.L.1694, No.188), known as the Capital
    30  Budget Project Itemization Act of 1991-1992.
    19970S0188B1336                 - 157 -

     1     Sections 3(4)(i)(A) and (ii)(E) and (6)(v)(A) and 7(1)(ii)(A)  <--
     2  and (iv)(A) of the act of July 8, 1994 (P.L.444, No.74), known
     3  as the Capital Budget Project Itemization Act for 1994-1995.
     4     Sections 3(7)(vi)(a) and 5(19)(i)(A) of the act of July 2,
     5  1993 (P.L.265, No.47), known as the Capital Budget Project
     6  Itemization Act for 1993-1994.
     7     Section 6(3)(ii)(A) SECTIONS 3(4)(I)(A) AND (II)(E) AND        <--
     8  (6)(V)(A), 6(3)(II)(A) AND 7(1)(II)(A), (IV)(A) AND (X)(A) of
     9  the act of July 8, 1994 (P.L.444, No.74), known as the Capital
    10  Budget Project Itemization Act for 1994-1995.
    11     Section 68(k)(1) of the act of December 12, 1994 (P.L.962,
    12  No.136), known as the First Supplemental Capital Budget Project
    13  Itemization Act of 1994-1995.
    14  Section 24 25.  Editorial changes.                                <--
    15     In editing and preparing this act for printing following the
    16  final enactment, the Legislative Reference Bureau shall insert
    17  or revise letters or numbers for projects where the letters or
    18  numbers are missing or require revision. The bureau shall also
    19  revise the total monetary amounts for the total authorization,
    20  debt authorization, appropriations and departmental totals as
    21  necessary to agree with the total monetary amounts of the
    22  projects.
    23  Section 25 26.  Effective date.                                   <--
    24     This act shall take effect immediately.