     1  To the act of July 11, 1996 (P.L.595, No.101), entitled "An act
     2     providing for the capital budget for the fiscal year 1996-
     3     1997," itemizing public improvement projects, furniture and
     4     equipment projects, transportation assistance projects,
     5     redevelopment assistance and redevelopment assistance capital
     6     projects, flood control projects, Keystone Recreation, Park
     7     and Conservation projects and forestry bridge projects to be
     8     constructed or acquired or assisted by the Department of
     9     General Services, the Department of Conservation and Natural
    10     Resources, the Department of Environmental Protection, the
    11     Department of Community and Economic Development, the
    12     Department of Transportation, the Pennsylvania Fish and Boat
    13     Commission or the Pennsylvania Game Commission, together with
    14     their estimated financial costs; authorizing the incurring of
    15     debt without the approval of the electors for the purpose of
    16     financing the projects to be constructed or acquired or
    17     assisted by the Department of General Services, the
    18     Department of Conservation and Natural Resources, the
    19     Department of Environmental Protection, the Department of
    20     Community and Economic Development or the Department of
    21     Transportation; stating the estimated useful life of the
    22     projects; authorizing certain waivers; making appropriations;
    23     and making repeals.

    24     The General Assembly of the Commonwealth of Pennsylvania
    25  hereby enacts as follows:
    26  Section 1.  Short title.
    27     This act shall be known and may be cited as the Capital


     1  Budget Project Itemization Act for 1996-1997.
     2  Section 2.  Total authorizations.
     3     (a)  Public improvements.--The total authorization for the
     4  additional capital projects in the category of public
     5  improvement projects itemized in section 3 and to be acquired or
     6  constructed by the Department of General Services, its
     7  successors or assigns, and to be financed by the incurring of
     8  debt, shall be $1,373,077,000 $1,756,335,000.                     <--
     9     (b)  Furniture and equipment.--The total authorization for
    10  the additional capital projects in the category of public
    11  improvement projects consisting of the acquisition of original
    12  movable furniture and equipment to complete public improvement
    13  projects itemized in section 4 and to be acquired by the
    14  Department of General Services, its successors or assigns, and
    15  to be financed by the incurring of debt, shall be $52,249,000     <--
    16  $52,677,000.
    17     (c)  Transportation assistance.--The total authorization for
    18  the capital projects in the category of transportation
    19  assistance projects itemized in section 5 with respect to which
    20  an interest is to be acquired in or constructed by the
    21  Department of Transportation, its successors or assigns, and to
    22  be financed by the incurring of debt, shall be $542,968,000       <--
    23  $534,271,000.
    24     (d)  Redevelopment assistance.--The total authorization for
    25  the additional capital projects in the category of redevelopment
    26  assistance and redevelopment assistance capital projects
    27  itemized in section 6 for capital grants by the Department of
    28  Community and Economic Development, its successors or assigns,
    29  and to be financed by the incurring of debt, shall be
    30  $921,068,000 $1,012,098,000.                                      <--
    19970S0188B0389                  - 2 -

     1     (e)  Flood control.--The total authorization for the capital
     2  projects in the category of flood control projects itemized in
     3  section 7 and to be constructed by the Department of
     4  Environmental Protection, its successors or assigns, and to be
     5  financed by the incurring of debt, shall be $20,456,000           <--
     6  $25,456,000.
     7     (f)  Keystone Recreation, Park and Conservation.--The total
     8  authorization for the capital projects in the category of
     9  Keystone Recreation, Park and Conservation projects itemized in
    10  section 8 and to be constructed by the Department of
    11  Conservation and Natural Resources, its successors or assigns,
    12  and to be financed from revenues in the Keystone Recreation,
    13  Park and Conservation Fund shall be $9,925,000 $14,400,000.       <--
    14     (g)  Game Fund projects.--The total authorization for the
    15  capital projects in the category of public improvement projects
    16  itemized in section 9 to be acquired by the Pennsylvania Game
    17  Commission and to be financed from current revenues of the Game
    18  Fund pursuant to executive authorizations shall be $5,000,000.
    19     (h)  Fish and Boat Fund projects.--The total authorization
    20  for the capital projects in the category of public improvement
    21  projects itemized in section 10 to be acquired or developed by
    22  the Pennsylvania Fish and Boat Commission and to be financed
    23  from current revenues of the Boat Fund and the Fish Fund
    24  pursuant to executive authorization shall be $6,380,000.
    25  Section 3.  Itemization of public improvement projects.
    26     Additional capital projects in the category of public
    27  improvement projects to be constructed or acquired by the
    28  Department of General Services, its successors or assigns, and
    29  to be financed by the incurring of debt, are hereby itemized,
    30  together with their respective estimated financial costs, as
    19970S0188B0389                  - 3 -

     1  follows:
     2                                                           Total
     3                                                          Project
     4             Project                                    Allocation
     5  (1)  Department of Agriculture                        $1,177,000  <--
     6  (1)  DEPARTMENT OF AGRICULTURE                       $12,397,000  <--
     7     (i)  Department of Agriculture Headquarters
     8         (A)  Construction of a headhouse and
     9             greenhouse addition including a covered
    10             walkway to connect all structures             392,000
    11             (Base Project Allocation - $327,000)
    12             (Design and Contingencies - $65,000)
    13     (ii)  Farm Show Complex
    14         (A)  Removal of piping and ducting which
    15             contain asbestos materials and/or
    16             encapsulation of asbestos containing
    17             materials in Large Arena                      785,000
    18             (Base Project Allocation - $654,000)
    19             (Design and Contingencies - $131,000)
    20         (B)  RECONSTRUCTION OF ROOF SYSTEM                         <--
    21             INCLUDING SUPPORTING JOISTS, FRAMING,
    22             DECKING, ASBESTOS ABATEMENT AND
    23             EXTERIOR MATERIALS INVOLVING 455,000
    24             SQUARE FEET OVER ALL MAIN EXHIBITION
    25             AREAS. PROJECT MUST BE FULLY EVALUATED
    26             REGARDING FEASIBILITY AND COSTS OF
    27             ALTERNATIVES TO RECONSTRUCTING THE
    28             EXISTING DESIGN BEFORE IMPLEMENTATION       9,000,000
    29             (BASE PROJECT ALLOCATION - $$7,500,000)
    30             (DESIGN AND CONTINGENCIES - $1,500,000)
    19970S0188B0389                  - 4 -

     1         (C)  CONVERSION OF ONE EXISTING BOILER TO A
     2             GAS/OIL FIRED UNIT TO ALLOW FLEXIBLE
     3             OPERATIONS AT LOWER PRESSURES                 420,000
     4             (BASE PROJECT ALLOCATION - $350,000)
     5             (DESIGN AND CONTINGENCIES - $70,000)
     6         (D)  EXTERIOR CLEANING, SEALING AND
     7             RECONSTRUCTION OF MASONRY WALLS AND
     8             DECORATIVE FRIEZES OF MAIN BUILDING         1,800,000
     9             (BASE PROJECT ALLOCATION - $1,500,000)
    10             (DESIGN AND CONTINGENCIES - $300,000)
    11  (2)  Department of Community and Economic
    12     Development                                      $148,000,000  <--
    13     DEVELOPMENT                                      $150,500,000  <--
    14     (i)  Port of Philadelphia
    15         (A)  Construction of a cruise ship
    16             facility                                    2,000,000
    17     (ii)  David L. Lawrence Convention Center
    18         (A)  Expansion of convention center           145,000,000
    19     (iii)  Pittsburgh's north shore
    20         (A)  Construction of a passenger pier
    21             terminal                                    1,000,000
    22     (IV)  SOMERSET COUNTY, SUMMIT TOWNSHIP                         <--
    23         (A)  RELOCATION OF APPROXIMATELY 46 HOUSES
    24             OUT OF THE FLOOD PLAIN OF THE CASSELMAN
    25             RIVER ACROSS THE RIVER FROM THE BOROUGH
    26             OF MEYERSDALE                               2,500,000
    27  (3)  Department of Conservation and Natural
    28     Resources                                         $20,847,000  <--
    29     RESOURCES                                         $25,568,000  <--
    30     (I)  COWANS GAP STATE PARK
    19970S0188B0389                  - 5 -

     1         (A)  DAY-USE UPGRADE                              300,000
     2         (B)  REPAIR DAM CONTROL TOWER AND GATE
     3             VALVE                                         700,000
     4         (C)  SEWAGE TREATMENT PLANT UPGRADE               200,000
     5     (i) (II)  Nescopeck State Park                                 <--
     6         (A)  Park development, construction of
     7             comfort stations, pavilions, warning                   <--
     8             WARMING huts, roadways, parking lots                   <--
     9             and utilities in the main, middle and
    10             lower day use areas                         2,000,000
    11         (B)  Development of cabin area,
    12             construction of ten rustic cabins,
    13             including roads, utilities and site
    14             development                                 1,500,000
    15         (C)  Development of overnight camping area,
    16             construction of campground to include
    17             site development, bath houses, living
    18             areas, roads, overflow parking and
    19             utilities                                   1,500,000
    20     (III)  OIL CREEK STATE PARK                                    <--
    21         (A)  REHABILITATION AND ENLARGEMENT OF
    22             TRAIN STATION                                 100,000
    23         (B)  DESIGN, PRODUCTION AND INSTALLATION OF
    24             EXHIBITS                                      201,000
    25     (ii) (IV)  Presque Isle State Park                             <--
    26         (A)  Waterworks reservoir area - Phase II         950,000
    27         (B)  Rehabilitation of park roadways            1,760,000
    28         (C)  Rehabilitation of water mains serving
    29             park                                        2,610,000
    30         (D)  State share of the cost of
    19970S0188B0389                  - 6 -

     1             replenishing the sand on the lake side
     2             shore                                         650,000
     3             (Base Project Allocation - $650,000)
     4         (E)  Beach nourishment and breakwater
     5             maintenance                                 5,800,000
     6         (F)  Rehabilitation of comfort facilities
     7             and sewage system                           1,800,000
     8         (G)  Rehabilitation of Presque Isle Marina        962,000
     9     (V)  PRINCE GALLITZEN STATE PARK                               <--
    10         (A)  ADDITIONAL FUNDS FOR DGS 195-37,
    11             REHABILITATE MARINA, PHASE III,
    12             CONSTRUCT BULKHEAD TO PROTECT AREA FROM
    13             EROSION                                     1,500,000
    14             (BASE PROJECT ALLOCATION - $1,250,000)
    15             (DESIGN AND CONTINGENCIES - $250,000)
    16     (iii) (VI)  Shawnee State Park                                 <--
    17         (A)  Additional funds for DGS 155-11,
    18             replacement of two bridges on main park
    19             road                                          900,000
    20         (B)  REPLACE LIFT STATION                          80,000  <--
    21         (C)  CONSTRUCT RENTAL CABINS AND SUPPORT
    22             FACILITIES                                  1,500,000
    23         (D)  REHABILITATE WATER PLANT ROOF AND
    24             FILTERS                                       140,000
    25     (iv) (VII)  Tyler State Park                                   <--
    26         (A)  Rehabilitation of Schofield/Ford
    27             Covered Bridge                                250,000
    28     (v) (VIII)  Borough of Ashley                                  <--
    29         (A)  Chester area of Solomon's Creek and
    30             Bobby Strish Park Association,
    19970S0188B0389                  - 7 -

     1             enhancement to the trout fishing and
     2             picnic areas along Solomon's Creek,
     3             rehabilitation and/or construction of a
     4             baseball and softball field, concession
     5             stands, restroom facilities and parking
     6             lot                                           165,000
     7  (4)  Department of Corrections                       $80,544,000  <--
     8  (4)  DEPARTMENT OF CORRECTIONS                      $247,844,000  <--
     9     (i)  State Correctional Institution - Coal
    10         Township, Northumberland County
    11         (A)  Addition of three modular units for
    12             inmate housing                             27,600,000
    13             (Base Project Allocation - $23,000,000)
    14             (Design and Contingencies - $4,600,000)
    15     (ii)  State Correctional Institution - Dallas
    16         (A)  Reconstruction of three boilers,
    17             installation of new controls,
    18             reconstruction of support structures
    19             and associated fuel handling equipment      5,640,000
    20             (Base Project Allocation - $4,700,000)
    21             (Design and Contingencies - $940,000)
    22     (iii)  State Correctional Institution -
    23         Graterford
    24         (A)  Construction of a Level 2 housing
    25             unit, including dormitories, 50 double
    26             rooms, offices, sanitary facilities,
    27             multi-purpose room, laundry and storage
    28             areas                                       5,340,000
    29             (Base Project Allocation - $4,450,000)
    30             (Design and Contingencies - $890,000)
    19970S0188B0389                  - 8 -

     1         (B)  UPGRADE PERIMETER SECURITY INCLUDING                  <--
     2             ADDITIONAL LIGHTING FOR BOTH SIDES OF
     3             PERIMETER WALL, ELECTRIFIED FENCE
     4             INSIDE PERIMETER AND ELECTRONIC
     5             MONITORING AT THREE SALLY PORTS             5,456,000
     6             (BASE PROJECT ALLOCATION - $4,547,000)
     7             (DESIGN AND CONTINGENCIES - $909,000)
     8     (iv)  State Correctional Institution -
     9         Greensburg
    10         (A)  Upgrade electric utility system            2,400,000
    11             (Base Project Allocation - $2,000,000)
    12             (Design and Contingencies - $400,000)
    13     (v)  State Correctional Institution - Mercer
    14         (A)  Expansion of kitchen/dining,
    15             administration and program facilities
    16             along with utilities including water,
    17             sewer and electric                          6,000,000
    18             (Base Project Allocation - $5,000,000)
    19             (Design and Contingencies - $1,000,000)
    20         (B)  Construction of a Level 2 housing
    21             unit, including dormitories, 50 double
    22             rooms, offices, sanitary facilities,
    23             multi-purpose room, laundry and storage
    24             areas                                       5,340,000
    25             (Base Project Allocation - $4,450,000)
    26             (Design and Contingencies - $890,000)
    27     (VI)  STATE CORRECTIONAL INSTITUTION - MUNCY                   <--
    28         (A)  ADDITION OF TWO NEW CELL BLOCKS FOR
    29             CLOSE SECURITY, EXPANSION OF INFIRMARY,
    30             OUTSIDE WAREHOUSE, ELECTRICAL AND
    19970S0188B0389                  - 9 -

     1             BOILER UPGRADES                            26,364,000
     2             (BASE PROJECT ALLOCATION - $21,970,000)
     3             (DESIGN AND CONTINGENCIES - $4,394,000)
     4     (vi) (VII)  State Correctional Institution -                   <--
     5         Pittsburgh
     6         (A)  Rehabilitation of boiler plant
     7             components including combustion control
     8             system, stokers on boilers 4 and 5,
     9             emergency generator, ash removal system
    10             and building components                     3,120,000
    11             (Base Project Allocation - $2,600,000)
    12             (Design and Contingencies - $520,000)
    13     (vii) (VIII)  State Correctional Institution -                 <--
    14         Rockview
    15         (A)  Construction of a Level 2 housing
    16             unit, including dormitories, 50 double
    17             rooms, offices, sanitary facilities,
    18             multi-purpose room, and laundry and
    19             storage areas. Also renovations to the
    20             kitchen and dining rooms and
    21             improvements to the perimeter security
    22             and intrusion detection system              8,994,000
    23             (Base Project Allocation - $7,495,000)
    24             (Design and Contingencies - $1,499,000)
    25     (viii) (IX)  State Correctional Institution -                  <--
    26         Western Pennsylvania
    27         (A)  Additional funds for DGS 575-3, to
    28             provide for expansion to 750 beds          16,110,000
    29             (Base Project Allocation - $13,425,000)
    30             (Design and Contingencies - $2,685,000)
    19970S0188B0389                 - 10 -

     1     (X)  NEW STATE CORRECTIONAL INSTITUTION -                      <--
     2         WESTERN PENNSYLVANIA
     3         (A)  CONSTRUCTION OF A NEW CLOSE-SECURITY
     4             INSTITUTION IN WESTERN PORTION OF THE
     5             STATE WITH CAPACITY OF APPROXIMATELY
     6             1,236 CELLS. INCLUDES CONSTRUCTION OF
     7             ALL OTHER FACILITIES AS NECESSARY TO
     8             OPERATE INSTITUTION                       135,480,000
     9             (BASE PROJECT ALLOCATION -
    10             $105,984,000)
    11             (LAND ALLOCATION - $3,000,000)
    12             (DESIGN AND CONTINGENCIES -
    13             $26,496,000)
    14  (5)  Department of Education                        $383,648,000  <--
    15  (5)  DEPARTMENT OF EDUCATION                        $388,022,000  <--
    16     (i)  The Pennsylvania State University
    17         (A)  University Park Campus
    18             (I)  Classroom building - Phase II         12,100,000
    19             (II)  Renovation of Willard Building       10,300,000
    20             (III)  Renovation of Moore and Sparks
    21                 Buildings                              16,070,000
    22             (IV)  Library Depository Facility          11,000,000
    23             (V)  Renovation of Engineering Units
    24                 and Sackett Building                    8,600,000
    25             (VI)  Renovation of Chandlee
    26                 Laboratory                             10,200,000
    27             (VII)  Renovation of Whitmore and Davey
    28                 Laboratories                           10,200,000
    29         (B)  Altoona Campus
    30             (I)  Construct Multi-Story Classroom
    19970S0188B0389                 - 11 -

     1                 Facility                                7,000,000
     2         (C)  Capital Campus
     3             (I)  Construct academic activities
     4                 building                                3,750,000
     5         (D)  DuBois Campus
     6             (I)  Addition to and renovation of
     7                 Smeal Building                          1,700,000
     8         (E)  Great Valley Center
     9             (I)  Addition to building                   8,000,000
    10         (F)  Mont Alto
    11             (I)  Renovation of General Studies
    12                 Building                                3,200,000
    13         (G)  York Campus
    14             (I)  Construct library addition and
    15                 classroom building addition            11,900,000
    16         (H)  The Behrend College
    17             (I)  Construction of a research and
    18                 development center                     30,000,000
    19             (II)  Renovation of Otto Behrend
    20                 Building                                3,100,000
    21             (III)  Restoration of Erie Hall             1,800,000
    22             (IV)  Maintenance of Police and Safety
    23                 Building                                1,800,000
    24     (ii)  University of Pittsburgh
    25         (A)  Oakland Campus
    26             (I)  Upgrade and deferred maintenance
    27                 for buildings and building systems
    28                 Phase I                                12,000,000
    29             (II)  Upgrade and deferred maintenance
    30                 for buildings and building systems
    19970S0188B0389                 - 12 -

     1                 Phase II                               12,000,000
     2             (III)  Additional funds for DGS 1103-
     3                 48, Convocation/Events Center          25,000,000
     4             (IV)  Renovation of Trees Hall and
     5                 Fitzgerald Field House Phase I         11,300,000
     6             (V)  Renovation of the Cathedral of
     7                 Learning                               20,000,000
     8             (VI)  Additional Funds for Hillman
     9                 Library Renovation Phase II             9,600,000
    10             (VII)  Acquisition of Bellefield Tower
    11                 for WPIC Children and Family
    12                 Programming                             8,000,000
    13             (VIII)  Construction of Basic Sciences
    14                 Complex                                25,000,000
    15         (B)  Bradford Campus
    16             (I)  Communications, Art and Technology
    17                 Building                               15,800,000
    18         (C)  Johnstown Campus
    19             (I)  Additional funds for DGS 1103-53,
    20                 classroom/administration building         532,000
    21             (II)  Additional funds for Library
    22                 renovations                             1,580,000
    23     (iii)  Temple University
    24         (A)  Main Campus
    25             (I)  Installation of an Electronic
    26                 access/intrusion detection system
    27                 at main campus                          8,411,000
    28             (Base Project Allocation - $7,009,000)
    29             (Design and Contingencies - $1,402,000)
    30             (II)  Rehabilitation of lecture halls       4,900,000
    19970S0188B0389                 - 13 -

     1             (III)  Roofing replacement                  4,410,000
     2             (IV)  Tomlinson Theater rehabilitation
     3                 and addition                            5,049,000
     4             (V)  Mitten Hall renovation for
     5                 performance hall                        8,820,000
     6             (VI)  Rehabilitation of building system
     7                 components:  Curtis, Barton, Eeury,
     8                 Biolife Sciences                       15,000,000
     9             (VII)  College Hall Renovations - Phase
    10                 II                                        850,000
    11             (VIII)  ADDITIONAL FUNDS FOR DGS 1104-                 <--
    12                 57, EMERGENCY FIRE AND SAFETY
    13                 RENOVATIONS, PHASE II, TO ADDRESS
    14                 COMPLEXITIES REVEALED BY INITIAL
    15                 SURVEYS WITHIN BUILDINGS ON MAIN
    16                 CAMPUS TO ENABLE UNIVERSITY TO
    17                 COMPLY WITH FIRE CODES                  2,900,000
    18                 (BASE PROJECT ALLOCATION -
    19                 $2,417,000)
    20                 (DESIGN AND CONTINGENCIES -
    21                 $483,000)
    22         (B)  Ambler Campus
    23             (I)  Education/learning technology
    24                 center                                  7,200,000
    25         (C)  Various Campuses
    26             (I)  Masonry, sidewalk and walkway
    27                 repairs                                 7,812,000
    28             (II)  Telecommunications infrastructure
    29                 improvements                            8,100,000
    30             (III)  Deferred maintenance and energy
    19970S0188B0389                 - 14 -

     1                 conservation                            4,474,000
     2             (IV)  Computing and data
     3                 communications                          6,907,000
     4         (D)  All Campuses
     5             (I)  Fluorescent lighting retrofit          3,749,000
     6     (iv)  Lincoln University
     7         (A)  Construction of storm water drainage
     8             system including piping and a detention
     9             basin to prevent hydraulic overload of
    10             the sewer system                            1,084,000
    11             (Base Project Allocation - $903,000)
    12             (Design and Contingencies - $181,000)
    13     (v)  Thaddeus Stevens State School of
    14         Technology
    15         (A)  Construction of a multi-purpose
    16             activities center and rehabilitation
    17             and renovation of the existing
    18             gymnasium for a trade-technical
    19             laboratory                                  5,000,000
    20         (B)  Repair and rebuild underground utility
    21             tunnel system and repair masonry
    22             retaining wall adjacent to Stevens
    23             Avenue                                        350,000
    24         (C)  UPGRADE OF HIGH VOLTAGE ELECTRICAL                    <--
    25             DISTRIBUTION SYSTEM                           180,000
    26             (BASE PROJECT ALLOCATION - $150,000)
    27             (DESIGN AND CONTINGENCIES - $30,000)
    28         (D)  RECONSTRUCT AND SEPARATE STORM WATER
    29             AND SEWER CONDUIT SYSTEMS                   1,080,000
    30             (BASE PROJECT ALLOCATION - $900,000)
    19970S0188B0389                 - 15 -

     1             (DESIGN AND CONTINGENCIES - $180,000)
     2     (VI)  SCRANTON STATE SCHOOL FOR THE DEAF
     3         (A)  RECONSTRUCTION OF ROOF SYSTEM ON
     4             O'DONNELL BUILDING                            214,000
     5             (BASE PROJECT ALLOCATION - $178,000)
     6             (DESIGN AND CONTINGENCIES - $36,000)
     7  (6)  Department of Environmental Protection          $26,917,000  <--
     8  (6)  DEPARTMENT OF ENVIRONMENTAL PROTECTION          $27,757,000  <--
     9     (i)  Allegheny County
    10         (A)  Greenwald Road Flood Control Project
    11             DGS 184-20                                  2,000,000
    12         (B)  Additional funds for DGS 184-20,
    13             culverts and debris basin along
    14             tributary to Grassers Run, Bethel Park      1,080,000
    15             (Base Project Allocation - $900,000)
    16             (Design and Contingencies - $180,000
    17         (C)  Additional funds for DGS 184-18,
    18             construction of levee, floodplain
    19             excavation and concrete retaining wall
    20             along Pine Creek, Shaler Township             360,000
    21             (Base Project Allocation - $300,000)
    22             (Design and Contingencies - $60,000)
    23     (ii)  Armstrong County
    24         (A)  Reconstruction of valves and seals at
    25             the Ernest deep mine complex, Rayne
    26             Township                                      654,000
    27             (Base Project Allocation - $545,000)
    28             (Design and Contingencies - $109,000)
    29     (iii)  Bedford County
    30         (A)  Borough of Hyndman, flood protection
    19970S0188B0389                 - 16 -

     1             project                                     3,000,000
     2             (Base Project Allocation - $2,500,000)
     3             (Design and Contingencies - $500,000)
     4     (iv)  Berks County
     5         (A)  Replacement of the Felix Dam
     6             Construction of a new reinforced
     7             concrete dam                                3,900,000
     8             (Base Construction Allocation -
     9             $3,300,000)
    10             (Design and Contingencies - $600,000)
    11     (V)  BRADFORD COUNTY                                           <--
    12         (A)  REHABILITATION OF SAYRE FLOOD CONTROL
    13             PROJECT BY RECONSTRUCTING INTERCEPTOR
    14             DRAINAGE SYSTEM BENEATH LEVEE                 600,000
    15             (BASE PROJECT ALLOCATION - $500,000)
    16             (DESIGN AND CONTINGENCIES - $100,000)
    17     (v) (VI)  Bucks County                                         <--
    18         (A)  Flood control and storm water
    19             management, Phase I affecting Bristol
    20             Borough and Bristol, Falls and
    21             Middletown Townships                          350,000
    22     (vi) (VII)  Fayette County                                     <--
    23         (A)  Additional funds for DGS 180-23,
    24             construction of retaining walls and
    25             culverts and excavation to widen or
    26             deepen Dunbar Creek and Gist Run
    27             channel in Dunbar                             396,000
    28             (Base Project Allocation - $330,000)
    29             (Design and Contingencies - $66,000)
    30     (vii) (VIII)  Lebanon County                                   <--
    19970S0188B0389                 - 17 -

     1         (A)  Additional funds for Project DGS 182-
     2             12 located on Hazel Dyke Flood Control
     3             Project                                       480,000
     4             (Base Project Allocation - $400,000)
     5             (Design and Contingencies - $80,000)
     6     (IX)  LUZERNE COUNTY                                           <--
     7         (A)  CONSTRUCTION OF COMPACT EARTH LEVEE IN
     8             AREA OF FOX HILL IN PLAINS TOWNSHIP
     9             INCLUDING GRASS COVERED CHANNEL               240,000
    10             (BASE PROJECT ALLOCATION - $200,000)
    11             (DESIGN AND CONTINGENCIES - $40,000)
    12     (viii) (X)  Montgomery County                                  <--
    13         (A)  Additional funds for DGS 181-7,
    14             Plymouth Creek improvement, Borough of
    15             Conshohocken                                  240,000
    16             (Base Project Allocation - $200,000)
    17             (Design and Contingencies - $40,000)
    18     (ix) (XI)  Northumberland County                               <--
    19         (A)  Bank stabilization and reconstruction
    20             for Sunbury Flood Project                   1,440,000
    21             (Base Project Allocation - $1,200,000)
    22             (Design and Contingencies - $240,000)
    23     (x) (XII)  Tioga County                                        <--
    24         (A)  Knoxville Borough, design and                         <--
    25             construction of dike and levy               5,100,000
    26         (A)  BOROUGH OF KNOXVILLE, FLOOD PROTECTION                <--
    27             PROJECT                                     5,100,000
    28             (BASE PROJECT ALLOCATION - $4,250,000)
    29             (DESIGN AND CONTINGENCIES - $850,000)
    30     (xi) (XIII)  York County                                       <--
    19970S0188B0389                 - 18 -

     1         (A)  City of York, Spring Garden Township
     2             and York Township, Tyler Run Flood
     3             Control Project                             2,500,000
     4         (B)  Spring Garden Township, Springettsbury
     5             Township and York Township, Mill Creek
     6             Flood Control Project                       5,000,000
     7         (C)  Fairview Township, Flood Mitigation
     8             Project, relating to Meadowbrook Pump
     9             Station                                        50,000
    10         (D)  Franklintown Borough, flood control
    11             project relating to storm water
    12             management                                    367,000
    13         (E)  YOE BOROUGH AND YORK TOWNSHIP,                        <--
    14             CONSTRUCTION OF RETENTION BASINS ON
    15             MILL CREEK BETWEEN LOCUST AVENUE IN
    16             YORK TOWNSHIP AND BOUNDARY AVENUE IN
    17             YOE BOROUGH                                   400,000
    18  (7)  Department of General Services                  $43,113,000  <--
    19  (7)  DEPARTMENT OF GENERAL SERVICES                 $217,738,000  <--
    20     (i)  Capitol Complex
    21         (A)  Upgrade chillers and humidification
    22             systems at the State Museum and
    23             Archives Buildings                            720,000
    24             (Base Project Allocation - $600,000)
    25             (Design and Contingencies - $120,000)
    26         (B)  Additional funds for DGS 948-37,
    27             expansion of central air conditioning
    28             system to Main Capitol, INCLUDING                      <--
    29             FUNDING TO MAKE THE APPROPRIATE
    30             CONNECTIONS, REMOVE THE CURRENT CHILLER
    19970S0188B0389                 - 19 -

     1             SYSTEM AND PROVIDE HEATING AND COOLING
     2             THROUGHOUT                                 12,000,000
     3             (Base Project Allocation - $10,000,000)
     4             (Design and Contingencies - $2,000,000)
     5         (C)  ADDITIONAL FUNDS FOR PROJECT NO. DGS                  <--
     6             948-35, FIRE SAFETY CODE IMPROVEMENTS,
     7             CAPITOL COMPLEX TO CONTINUE THE FIRE
     8             SAFETY IMPROVEMENTS TO THE CAPITOL
     9             BUILDING, NORTH AND SOUTH OFFICE
    10             BUILDINGS, FORUM, FINANCE BUILDING,
    11             HEALTH AND WELFARE BUILDING AND LABOR
    12             AND INDUSTRY BUILDING, INCLUDING
    13             UPGRADING ELECTRICAL SYSTEM FOR CODE
    14             CONFORMANCE, ABATEMENT OF HAZARDOUS
    15             MATERIALS AFFECTING CONSTRUCTION,
    16             TEMPORARY RELOCATION OF OCCUPANTS FROM
    17             CONSTRUCTION AREAS (INCLUDING NEW
    18             FURNITURE AND EQUIPMENT NEEDED FOR
    19             TEMPORARY ARRANGEMENT) RE-ROUTING DATA,
    20             COMMUNICATION AND OTHER SYSTEMS IN
    21             ALIGNMENT WITH FIRE SAFETY POWER AND
    22             LIGHTING IMPROVEMENTS AND
    23             REPLACEMENT/RESTORATION OF FINISHES IN
    24             AREAS MODIFIED BY FIRE SAFETY
    25             IMPROVEMENTS, FOR PHASE I AND
    26             SUBSEQUENT PHASES                         138,750,000
    27             (BASE PROJECT ALLOCATION -
    28             $111,000,000)
    29             (DESIGN AND CONTINGENCIES -
    30             $27,750,000)
    19970S0188B0389                 - 20 -

     1         (D)  ADDITIONAL FUNDING FOR PROJECT NO. DGS
     2             946-2, RENOVATION AND CONVERSION OF OLD
     3             MUSEUM BUILDING FOR LEGISLATIVE OFFICES
     4             FOR THE REPAIR AND RESTORATION OF THE
     5             OLD MUSEUM BUILDING TO INCLUDE THE
     6             PLAZA ON THE WEST FACE OF THE BUILDING,
     7             SECURITY LIGHTING AT BASEMENT DRIVEWAY,
     8             RESTORATION AND MODERN REPLICATION OF
     9             HISTORIC LIGHT FIXTURES WITH UL LABELS
    10             AND MISCELLANEOUS RENOVATION AND
    11             RESTORATION CONSISTENT WITH THE
    12             INTENDED PURPOSE                            3,000,000
    13             (BASE PROJECT ALLOCATION - $2,400,000)
    14             (DESIGN AND CONTINGENCIES - $600,000)
    15         (E)  REPAIR AND RENOVATION OF THE CAPITOL
    16             COMPLEX TO PROVIDE FOR THE REPAIR OF
    17             EXTERIOR WALKS, RAILINGS AND EXTERIOR
    18             SITE IMPROVEMENTS, THE RENOVATION OF
    19             THE CAPITOL BASEMENT AND FIFTH FLOOR
    20             CORRIDORS, THE REPAIR AND INSTALLATION
    21             OF NEW CATWALKS, THE RENOVATION OF
    22             PUBLIC RESTROOMS, THE REPAIR AND
    23             UPGRADING OF THE PLUMBING SYSTEM
    24             INCLUDING THE CHILLED DRINKING WATER
    25             SYSTEM; THE REPLACEMENT OF THE EAST
    26             WING PARAMETRIC BOARDS AND UPGRADED
    27             HVAC DIRECT DIGITAL CONTROL INCLUDING
    28             CENTRAL PLANT AND ALL ASSOCIATED
    29             BUILDINGS, AND THE UPGRADE OF POWER AND
    30             LIGHTING IN CENTRAL PLANT AND SERVICE
    19970S0188B0389                 - 21 -

     1             TUNNELS TO THE CAPITOL AND ASSOCIATED
     2             BUILDINGS                                  14,000,000
     3             (BASE PROJECT ALLOCATION - $11,200,000)
     4             (DESIGN AND CONTINGENCIES - $2,800,000)
     5         (F)  ADDITIONAL FUNDING FOR PROJECT NO. DGS
     6             948-34, REPAIR AND RESTORATION WORK FOR
     7             STATUARIES AND NORTH, SOUTH AND CENTER
     8             PORTICOES AND PLAZA LEVEL ENTRIES OF
     9             THE CAPITOL BUILDING TO CONTINUE THE
    10             REPAIR AND RESTORATION OF THE MASONRY
    11             TO THE PORCHES AND PORTICOES OF THE
    12             CAPITOL BUILDING                            1,000,000
    13             (BASE PROJECT ALLOCATION - $800,000)
    14             (DESIGN AND CONTINGENCIES - $200,000)
    15         (C) (G)  Additional funds for DGS 948-9,                   <--
    16             renovation of the Finance Building          5,203,000
    17             (Base Project Allocation - $4,336,000)
    18             (Design and Contingencies - $867,000)
    19         (D) (H)  Acoustical improvements at The                    <--
    20             Forum                                       3,000,000
    21             (Base Project Allocation - $2,600,000)
    22             (Design and Contingencies - $400,000)
    23         (E) (I)  Restoration of ceiling and wall                   <--
    24             murals at The Forum                         1,490,000
    25         (F) (J)  Upgrade fire alarm and security                   <--
    26             systems in the State Museum and
    27             Archives Buildings                            600,000
    28         (G) (K)  Upgrade and installation of new                   <--
    29             fire suppression system in the State
    30             Museum and Archives Buildings               1,500,000
    19970S0188B0389                 - 22 -

     1         (H) (L)  Upgrade electrical distribution                   <--
     2             system in the State Museum and Archives
     3             Buildings                                   3,800,000
     4         (I) (M)  Repair compression joints and                     <--
     5             stabilize exterior cladding on Museum
     6             Building                                      800,000
     7         (J) (N)  Upgrade HVAC systems including                    <--
     8             installation of humidification and
     9             filtration equipment in the State
    10             Museum and Archives Buildings               4,000,000
    11         (K) (O)  Roof replacement State Museum                     <--
    12             Building                                    1,200,000
    13         (L) (P)  Asbestos abatement in the State                   <--
    14             Museum and Archives Buildings                 800,000
    15         (M) (Q)  Upgrade elevator and escalator                    <--
    16             systems in the State Museum Building        1,000,000
    17         (R)  RECONSTRUCTION OF ROOF AND CLEAN, SEAL                <--
    18             AND RESECURE EXTERIOR STONE PANELS AND
    19             DOORS AT THE STATE MUSEUM AND ARCHIVES
    20             BUILDING                                      600,000
    21             (BASE PROJECT ALLOCATION - $500,000)
    22             (DESIGN AND CONTINGENCIES - $100,000)
    23         (S)  UPGRADE WINDOWS AND CLEAN, SEAL AND
    24             CAULK EXTERIOR OF STATE FINANCE
    25             BUILDING                                    6,600,000
    26             (BASE PROJECT ALLOCATION - $5,500,000)
    27             (DESIGN AND CONTINGENCIES - $1,100,000)
    28         (T)  UPGRADE WINDOWS AND EXTERIOR DOOR
    29             ENCLOSURES IN LABOR AND INDUSTRY
    30             BUILDING                                    5,280,000
    19970S0188B0389                 - 23 -

     1             (BASE PROJECT ALLOCATION - $4,400,000)
     2             (DESIGN AND CONTINGENCIES - $880,000)
     3         (U)  UPGRADE WINDOWS AND ENTRANCE DOORS AND
     4             CLEAN AND SEAL EXTERIOR GRANITE AT
     5             HEALTH AND WELFARE BUILDING                 4,600,000
     6             (BASE PROJECT ALLOCATION - $4,000,000)
     7             (DESIGN AND CONTINGENCIES - $600,000)
     8     (II)  FARM SHOW COMPLEX
     9         (A)  UPGRADE EXTERIOR WATERPROOF MEMBRANE,
    10             REPOINT AND RESET MASONRY AND UPGRADE
    11             ENTRANCE DOORS AT THE AGRICULTURE
    12             BUILDING                                      518,000
    13             (BASE PROJECT ALLOCATION - $450,000)
    14             (DESIGN AND CONTINGENCIES - $68,000)
    15     (III)  PUBLIC WORKS COMPLEX
    16         (A)  RECONSTRUCTION OF EXTERIOR MASONRY AND
    17             RESEALING OF THE EXTERIOR OF THE
    18             ARSENAL BUILDING AND RECONSTRUCTION OF
    19             ROOF ON FORMER AMMUNITION BUNKER NOW
    20             USED AS AN ARCHIVE                            150,000
    21             (BASE PROJECT ALLOCATION - $125,000)
    22             (DESIGN AND CONTINGENCIES - $25,000)
    23     (IV)  GOVERNOR'S RESIDENCE
    24         (A)  UPGRADE THE HEATING, VENTILATING AND
    25             AIR-CONDITIONING SYSTEM                       127,000
    26             (BASE PROJECT ALLOCATION - $110,000)
    27             (DESIGN AND CONTINGENCIES - $17,000)
    28     (ii) (V)  Warner Theater, Erie County                          <--
    29         (A)  Conversion of the theater into a
    30             performing arts center including
    19970S0188B0389                 - 24 -

     1             additions to the stage area,
     2             improvements to mechanical systems and
     3             installation of elevators                   7,000,000
     4             (Base Project Allocation - $5,833,000)
     5             (Design and Contingencies - $1,167,000)
     6  (8)  Historical and Museum Commission                   $750,000  <--
     7  (8)  HISTORICAL AND MUSEUM COMMISSION                 $2,955,000  <--
     8     (I)  DRAKE WELL STATE MUSEUM
     9         (A)  BOOMTOWN AND OTHER EXHIBIT DEVELOPMENT
    10             AND CONSTRUCTION                            2,105,000
    11     (i) (II)  Niagara Maritime Museum                              <--
    12         (A)  Construction of fixed exhibits               750,000
    13             (Base Project Allocation - $625,000)
    14             (Design and Contingencies - $125,000)
    15     (III)  PITHOLE STATE MUSEUM                                    <--
    16         (A)  DEVELOPMENT AND CONSTRUCTION OF
    17             EXTERIOR WALKWAYS, BOARDWALKS AND
    18             SIGNAGE                                       100,000
    19  (9)  Department of Labor and Industry                 $7,000,000
    20     (i)  Hiram G. Andrews Center
    21         (A)  Upgrade and repair of facility             7,000,000
    22  (10)  Department of Military Affairs                 $23,165,000  <--
    23  (10)  DEPARTMENT OF MILITARY AND VETERANS AFFAIRS    $26,628,000  <--
    24     (i)  Cambria County Armory at Johnstown
    25         (A)  Renovation and addition                    1,380,000
    26             (Base Project Allocation - $1,150,000)
    27             (Design and Contingencies - $230,000)
    28     (ii)  Franklin County Veterans Care Facility
    29         (A)  South Mountain Restoration Center         12,000,000
    30             (Base Project Allocation - $10,400,000)
    19970S0188B0389                 - 25 -

     1             (Design and Contingencies - $1,600,000)
     2     (iii)  Holidaysburg Veterans Home
     3         (A)  Improvements to facility roadways and
     4             parking lots                                1,000,000
     5     (iv)  Southeastern Veterans Home
     6         (A)  Expansion of parking facility                285,000
     7     (v)  Scotland School
     8         (A)  Additional funds for project DGS 415-
     9             29, reconstruction of the main dining
    10             hall                                          500,000
    11     (vi)  Western maneuver training area
    12         (A)  To acquire three parcels of land,
    13             5,300 acres more or less, to establish
    14             a tracked vehicle maneuver training
    15             area in Western Pennsylvania for the
    16             Pennsylvania National Guard                 8,000,000
    17     (VII)  ARMORY AT LATROBE                                       <--
    18         (A)  CONSTRUCTION OF A NEW ARMORY AT
    19             LATROBE, WESTMORELAND COUNTY TO REPLACE
    20             EXISTING ARMORIES AT BLAIRSVILLE AND
    21             LATROBE                                     1,800,000
    22             (BASE PROJECT ALLOCATION - $1,300,000)
    23             (LAND ALLOCATION - $300,000)
    24             (DESIGN AND CONTINGENCIES - $200,000)
    25     (VIII)  ARMORY AT TIOGA COUNTY
    26         (A)  CONSTRUCTION OF A NEW ARMORY IN TIOGA
    27             COUNTY TO REPLACE EXISTING ARMORIES AT
    28             MANSFIELD AND WELLSBORO                     1,363,000
    29             (BASE PROJECT ALLOCATION - $1,163,000)
    30             (DESIGN AND CONTINGENCIES - $200,000)
    19970S0188B0389                 - 26 -

     1     (IX)  MAINTENANCE SHOP AT JOHNSTOWN
     2         (A)  LAND ACQUISITION FOR THE CONSTRUCTION
     3             OF AN OPERATIONS MAINTENANCE SHOP AT
     4             JOHNSTOWN, CAMBRIA COUNTY                     300,000
     5  (11)  Department of Public Welfare                    $3,924,000  <--
     6  (11)  DEPARTMENT OF PUBLIC WELFARE                   $13,744,000  <--
     7     (i)  Norristown State Hospital
     8         (A)  Reconstruction or replacement of
     9             boilers to meet emissions requirements
    10             and upgrade the steam distribution
    11             system                                      3,924,000
    12             (Base Project Allocation - $3,270,000)
    13             (Design and Contingencies - $654,000)
    14     (II)  CLARKS SUMMIT STATE HOSPITAL                             <--
    15         (A)  ADDITIONAL FUNDS FOR PROJECT DGS 502-
    16             25, RENOVATION OF POWER PLANT BOILERS
    17             AND DISTRIBUTION SYSTEM                     4,480,000
    18             (BASE PROJECT ALLOCATION - $3,480,000)
    19             (DESIGN AND CONTINGENCIES - $1,000,000)
    20     (III)  DANVILLE STATE HOSPITAL
    21         (A)  INSTALLATION OF UPGRADED HIGH VOLTAGE
    22             DISTRIBUTION CABLES THROUGHOUT SYSTEM         540,000
    23             (BASE PROJECT ALLOCATION - $450,000)
    24             (DESIGN AND CONTINGENCIES - $90,000)
    25     (IV)  SOUTH MOUNTAIN RESTORATION CENTER
    26         (A)  INSTALLATION OF INTEGRATED AND UPDATED
    27             FIRE ALARM SYSTEM FOR ENTIRE FACILITY       2,160,000
    28             (BASE PROJECT ALLOCATION - $1,800,000)
    29             (DESIGN AND CONTINGENCIES - $360,000)
    30     (V)  EBENSBURG CENTER
    19970S0188B0389                 - 27 -

     1         (A)  ADDITIONAL FUNDS FOR PROJECT DGS 583-
     2             11, REPLACEMENT OF STEAM LINES                720,000
     3             (BASE PROJECT ALLOCATION - $600,000)
     4             (DESIGN AND CONTINGENCIES - $120,000)
     5     (VI)  POLK CENTER
     6         (A)  INSTALLATION OF INTEGRATED AND UPDATED
     7             FIRE ALARM SYSTEM FOR ENTIRE FACILITY       1,440,000
     8             (BASE PROJECT ALLOCATION - $1,200,000)
     9             (DESIGN AND CONTINGENCIES - $240,000)
    10     (VII)  WHITE HAVEN CENTER
    11         (A)  UPGRADE OF ELECTRICAL DISTRIBUTION
    12             SYSTEM                                        480,000
    13             (BASE PROJECT ALLOCATION - $400,000)
    14             (DESIGN AND CONTINGENCIES - $80,000)
    15  (12)  Pennsylvania State Police                       $4,680,000
    16     (i)  Trevose Station, Bucks County
    17         (A)  Demolition of existing structure and
    18             construction of new building on site        2,000,000
    19     (ii)  Hollidaysburg Troop Headquarters
    20         (A)  Additional funds for DGS 201-3,
    21             renovation and expansion of
    22             headquarters                                2,680,000
    23             (Base Project Allocation - $2,233,000)
    24             (Design and Contingencies - $447,000)
    25  (13)  State System of Higher Education              $560,270,000
    26     (i)  Bloomsburg State University
    27         (A)  Addition to Hartline Science               6,348,000
    28         (B)  Renovation of Navy Hall                    4,288,000
    29         (C)  Renovation of Andrus Building              7,280,000
    30     (ii)  California State University
    19970S0188B0389                 - 28 -

     1         (A)  Demolition of Reed Hall                      330,000
     2         (B)  Renovation of Old Main and South Hall      8,827,000
     3         (C)  Addition to and renovation of Steel
     4             Auditorium                                  5,718,000
     5         (D)  Renovation of Vulcan Hall                  1,668,000
     6         (E)  Renovation of Noss Hall                    3,366,000
     7         (F)  Installation of water back flow
     8             preventers, campuswide                        497,000
     9         (G)  Pedestrian and vehicular enhancement,                 <--
    10             PHASE I                                     4,592,000
    11     (iii)  Cheyney University of Pennsylvania
    12         (A)  Addition to and renovation of athletic
    13             facility                                    3,022,000
    14         (B)  Infrastructure renovations, PHASE II       2,916,000  <--
    15         (C)  Renovation of Bailey Hall                  4,369,000
    16     (iv)  Clarion State University
    17         (A)  Renovate/upgrade communication and
    18             electrical system                           4,944,000
    19         (B)  Replace steam lines - Phase III            5,476,000
    20         (C)  Addition to and renovation of Carlson
    21             Library                                    17,060,000
    22         (D)  Renovation of Pierce Science Center       19,762,000
    23     (v)  East Stroudsburg State University
    24         (A)  Renovation of Rosenkrans Hall              3,875,000
    25         (B)  Addition to and renovation of
    26             auditorium                                  4,900,000
    27         (C)  Renovation of LeRue Arts                     861,000
    28         (D)  Upgrade infrastructure of AND storm                   <--
    29             water management system                     4,920,000
    30         (E)  Addition to and renovation of stadium
    19970S0188B0389                 - 29 -

     1             complex                                     3,226,000
     2         (F)  Renovation of Fine and Performing Arts
     3             Building                                    1,080,000
     4         (G)  Renovation of and addition to
     5             storeroom and garage                        2,378,000
     6     (vi)  Edinboro State University
     7         (A)  Renovation of Butterfield Hall             4,936,000
     8         (B)  Rehabilitation of campus
     9             infrastructure                              5,820,000
    10         (C)  Renovation of Memorial Auditorium          2,498,000
    11         (D)  Renovation of Heather Hall                 2,267,000
    12         (E)  Renovation of Baron-Forness Library        5,772,000
    13     (vii)  Indiana State University
    14         (A)  Renovation of Stabley Library              4,632,000
    15         (B)  Renovation of CONSTRUCTION OF A                       <--
    16             REPLACEMENT FACILITY FOR Wyandt Hall,
    17             Armstrong Campus                            5,250,000
    18         (C)  Renovation of CONSTRUCTION OF A                       <--
    19             REPLACEMENT FACILITY FOR Old Main,
    20             Punxsutawney Campus                         4,632,000
    21         (D)  Addition to and renovation of Cogswell
    22             Hall                                        8,888,000
    23         (E)  Renovation of Keith Hall                   7,057,000
    24         (F)  Renovation of John Sutton Hall - Phase
    25             I                                           7,382,000
    26         (G)  Renovation of Leonard Hall                 5,252,000
    27     (viii)  Kutztown State University
    28         (A)  Renovation of Graduate Center              3,598,000
    29         (B)  Addition to and renovation of science
    30             buildings                                  18,662,000
    19970S0188B0389                 - 30 -

     1         (C)  Construction of Kutztown University
     2             access road                                 2,760,000
     3         (D)  Renovation of Shaeffer Auditorium          5,206,000
     4         (E)  Addition to or renovation of
     5             maintenance building                        4,198,000
     6         (F)  Renovation and upgrade of boiler
     7             plant                                       2,857,000
     8         (G)  Renovation of Reisley Hall                 2,635,000
     9     (ix)  Lock Haven State University
    10         (A)  Renovation of New Ulmer Hall               6,720,000
    11         (B)  Renovation of Zimmerli Gym                 7,306,000
    12         (C) Addition to and renovation of Jack
    13             Stadium - Phase III                         2,798,000
    14         (D)  Renovation of Lusk Run Conduit             1,560,000
    15     (x)  Mansfield State University
    16         (A)  Addition to and renovation of Grant
    17             Science                                     9,959,000
    18         (B)  Addition to and renovation of home
    19             economics center                            6,672,000
    20         (C)  Renovation of South Hall                   4,178,000
    21     (xi)  Millersville State University
    22         (A)  Addition to and renovation of McComsey
    23             Hall                                        7,657,000
    24         (B)  Renovation of Gerhart Hall                   236,000
    25         (C)  Addition to and renovation of Stayer
    26             Hall                                        6,835,000
    27         (D)  Renovation of Roddy Science Center         5,870,000
    28         (E)  Renovation of Lyle Hall                    2,681,000
    29         (F)  Renovation of Osburn Hall                  4,198,000
    30         (G)  Renovation of Ganser Building              5,914,000
    19970S0188B0389                 - 31 -

     1         (H)  Renovation of Wickersham Hall              2,123,000
     2         (I)  Upgrade of electrical utility system       6,480,000
     3     (xii)  Shippensburg State University
     4         (A)  Renovation of Horton Hall                  6,920,000
     5         (B)  Renovation of Gilbert and Stewart
     6             Halls                                       3,478,000
     7         (C)  Construction of instructional arts
     8             facility                                   19,853,000
     9         (D)  Addition to and renovation of Lehman
    10             Library                                    19,778,000
    11         (E)  Reconstruction of roadways, sidewalks
    12             and parking facilities                      4,618,000
    13         (F)  Renovation of Franklin Science Center     14,514,000
    14         (G)  Renovation of Huber Arts Center AND                   <--
    15             COUNSELOR EDUCATION BUILDING                2,798,000
    16         (H)  Addition to and renovation of Shippen
    17             Hall                                       15,814,000
    18         (I)  Upgrade Steam Plant Boiler No. 4             563,000
    19         (J)  Renovation of Rowland and Shearer
    20             Halls                                       5,167,000
    21         (K)  Renovation of Dauphin Humanities           4,124,000
    22         (L)  Construction of Central Services
    23             Building                                    1,529,000
    24     (xiii)  Slippery Rock State University
    25         (A)  Renovation of Vincent Science
    26             Building                                   13,672,000
    27         (B)  Renovation of West Hall                    2,260,000
    28         (C)  Renovation of Morrow Field House          12,564,000
    29         (D)  Reconstruction of roadways, SIDEWALKS                 <--
    30             and parking areas                           2,244,000
    19970S0188B0389                 - 32 -

     1         (E)  Construction of health professionals
     2             building                                   12,324,000
     3         (F)  Renovation of steam distribution
     4             system - Phase II                           7,680,000
     5     (xiv)  West Chester State University
     6         (A)  Renovation of Francis Harvey Green
     7             Building                                    4,154,000
     8         (B)  Construction of classroom facility        12,959,000
     9         (C)  Renovation of Schmucker Science -
    10             Phase III                                  15,842,000
    11         (D)  Renovation of Lawrence Hall                3,051,000
    12         (E)  Construction of
    13             computing/instructional technology
    14             center                                     10,931,000
    15         (F)  Construction of all-purpose outdoor
    16             physical education and athletic fields      3,314,000
    17         (G)  Infrastructure Upgrade UPGRADE/CODE                   <--
    18             UPDATES - Phase I                          11,158,000
    19         (H)  Construction of Recital Hall               3,317,000
    20         (I)  Addition to and renovation of Eringer
    21             Gym and Special Education Building          3,883,000
    22     (xv)  Systemwide project
    23         (A)  Alteration of facilities for ADA
    24             compliance                                 34,569,000
    25  (14)  Department of Transportation                   $68,972,000  <--
    26  (14)  DEPARTMENT OF TRANSPORTATION                   $70,832,000  <--
    27     (i)  Road Signage
    28         (A)  Purchase and erection of highway signs
    29             in Fayette, Westmoreland and Somerset
    30             Counties to promote access to Laurel
    19970S0188B0389                 - 33 -

     1             Highlands                                     400,000
     2     (ii)  Erie County Welcome Center
     3         (A)  Additional funds to construct a new
     4             welcome center                              3,423,000
     5             (Base Project Allocation - $2,759,000)
     6             (Land Allocation - $120,000)
     7             (Design and Contingencies - $544,000)
     8     (iii)  Harrisburg International Airport
     9         (A)  Replacement of the concrete surface of
    10             runway 13-31                               11,268,000
    11             (Base Project Allocation - $11,268,000)
    12         (B)  Construction of a centralized de-icing
    13             facility and the modification of the
    14             hold pad at runway 13 for secondary de-
    15             icing                                       8,936,000
    16             (Base Project Allocation - $8,936,000)
    17     (iv)  Allegheny County
    18         (A)  High performance precision
    19             manufacturing technology development by
    20             the Institute for Precision
    21             Technologies for use in bridge
    22             structures, hermetically sealed box
    23             beams and other metal fabricated
    24             infrastructure components for
    25             transportation systems                      1,000,000
    26         (B)  High performance precision
    27             manufacturing technology development by
    28             the Institute for Precision
    29             Technologies for use in bridge
    30             structures, hermetically sealed box
    19970S0188B0389                 - 34 -

     1             beams and other metal fabricated
     2             infrastructure components for
     3             transportation systems                     25,000,000
     4             (Base Project Allocation - $24,000,000)
     5             (Design and Contingencies - $1,000,000)
     6     (v)  Blair County
     7         (A)  Construction of new maintenance
     8             building at District 9-0 headquarters         700,000
     9             (Base Project Allocation - $645,000)
    10             (Design and Contingencies - $55,000)
    11     (vi)  Montgomery County
    12         (A)  Reconstruction and Rehabilitation of
    13             Main Street from Beaver Street to
    14             Prospect Avenue, Borough of North
    15             Wales                                       1,715,000
    16     (vii)  Montour County
    17         (A)  Additional Funds for project DGS 251-
    18             35, construction of transportation
    19             maintenance shed                              500,000
    20     (viii)  Philadelphia, Delaware and Bucks
    21         Counties
    22         (A)  Dredging of the channel of the
    23             Delaware River from 40 to 45 feet          15,000,000
    24     (ix)  City of Erie
    25         (A)  Improvements to city enterprise zone
    26             transportation infrastructure                 530,000
    27     (x)  Tioga County
    28         (A)  Grand Canyon State Airport
    29             (I)  Construction of 20 hangars               500,000
    30             (Base Project Allocation - $400,000)
    19970S0188B0389                 - 35 -

     1             (Design and Contingencies - $100,000)
     2     (XI)  ADAMS COUNTY WELCOME CENTER                              <--
     3         (A)  ADDITIONAL FUNDS FOR PROJECT DGS 657-
     4             6, TO CONSTRUCT A NEW WELCOME CENTER          540,000
     5             (BASE PROJECT ALLOCATION - $450,000)
     6             (DESIGN AND CONTINGENCIES - $90,000)
     7     (XII)  SUSQUEHANNA COUNTY WELCOME CENTER
     8         (A)  ADDITIONAL FUNDS FOR PROJECT DGS 657-
     9             13, TO CONSTRUCT WELCOME CENTER IN
    10             GREAT BEND TOWNSHIP                         1,320,000
    11             (BASE PROJECT ALLOCATION - $1,100,000)
    12             (DESIGN AND CONTINGENCIES - $220,000)
    13  Section 4.  Itemization of furniture and equipment projects.
    14     Additional capital projects in the category of public
    15  improvement projects consisting of the acquisition of movable
    16  furniture and equipment to complete public improvement projects
    17  and to be purchased by the Department of General Services, its
    18  successors or assigns, and to be financed by the incurring of
    19  debt, are hereby itemized, together with their respective
    20  estimated financial costs, as follows:
    21                                                           Total
    22                                                          Project
    23             Project                                    Allocation
    24  (1)  Department of Agriculture                          $804,000
    25     (i)  Agriculture Laboratory
    26         (A)  Original furniture and equipment for
    27             Agriculture laboratory DGS 700-32             804,000
    28  (2)  Department of Conservation and Natural
    29     Resources                                             $90,000  <--
    30     RESOURCES                                            $270,000  <--
    19970S0188B0389                 - 36 -

     1     (I)  GREENWOOD FURNACE STATE PARK
     2         (A)  ORIGINAL FURNITURE AND EQUIPMENT TO
     3             DEVELOP PICNIC AND CAMPING FACILITIES,
     4             DGS 129-1                                      90,000
     5         (B)  ORIGINAL FURNITURE AND EQUIPMENT FOR
     6             ADMINISTRATIVE AND SUPPORT STRUCTURES,
     7             DGS 129-2                                      90,000
     8     (i) (II)  Pymatuning State Park                                <--
     9         (A)  Original furniture and equipment to
    10             rehabilitate Linesville boat livery DGS
    11             103-4                                          70,000
    12     (ii) (III)  Sinnemahoning State Park                           <--
    13         (A)  Original furniture and equipment to
    14             reconstruct spillway and control tower
    15             DGS 104-4                                      20,000
    16  (3)  Department of Education                         $18,037,000
    17     (i)  The Pennsylvania State University
    18         (A)  University Park Campus
    19             (I)  Renovation of animal diagnostic
    20                 laboratory and incinerator DGS 800-
    21                 244                                       240,000
    22             (II)  Electrical distribution system
    23                 DGS 800-217                               390,000
    24         (B)  Behrend Campus
    25             (I)  Multipurpose facility for student
    26                 activities DGS 800-220                  1,550,000
    27         (C)  Berks Campus
    28             (I)  Acquisition of land and
    29                 development of an agricultural
    30                 instruction center DGS 800-204            850,000
    19970S0188B0389                 - 37 -

     1         (D)  Fayette Campus
     2             (I)  Multipurpose technological-
     3                 cultural "Southwest Institute" DGS
     4                 800-209                                   620,000
     5             (II)  Agricultural sciences
     6                 classroom/laboratory building DGS
     7                 800-210                                   460,000
     8             (III)  Biomedical technology center DGS
     9                 800-238                                   660,000
    10         (E)  Harrisburg Campus
    11             (I)  Original furniture and equipment
    12                 for library DGS 800-233                 1,650,000
    13         (F)  New Kensington Campus
    14             (I)  Addition to academic building DGS
    15                 800-212                                   260,000
    16         (G)  Wilkes-Barre Campus
    17             (I)  Technology center DGS 800-218            200,000
    18     (ii)  University of Pittsburgh
    19         (A)  Original furnishings and equipment for
    20             Smith Hall DGS 1103-58 - Greensburg
    21             Campus                                         45,000
    22         (B)  Additional funds for
    23             Classroom/Administration Building DGS
    24             1103-53 - Johnstown Campus                    525,000
    25         (C)  Original furnishings and equipment for
    26             Engineering and Science Center -
    27             Johnstown Campus DGS 1103-59                   76,000
    28         (D)  Additional funds for
    29             Convocation/Events Center DGS 1103-48 -
    30             Oakland Campus                              1,458,000
    19970S0188B0389                 - 38 -

     1         (E)  Additional funds for Multi-Purpose
     2             Academic Complex DGS 1103-40 - Oakland
     3             Campus                                      2,093,000
     4         (F)  Additional funds for Hillman Library
     5             Addition DGS 1103-55 - Oakland Campus         316,000
     6         (G)  Original furnishings and equipment for
     7             Science Building DGS 1103-54 -
     8             Titusville Campus                             195,000
     9         (H)  Original furniture and equipment for
    10             Sports Center expansion - Bradford
    11             Campus                                      2,300,000
    12         (I)  Original furniture and equipment for
    13             Communications, Arts and Technology
    14             Building - Bradford Campus                  2,200,000
    15         (J)  Additional original furniture and
    16             equipment for Bellefield Annex
    17             renovation - Oakland Campus                   199,000
    18     (iii)  Northwest Pennsylvania Technical
    19         Institute
    20         (A)  Original furniture and equipment for
    21             Erie County public learning network         1,000,000
    22     (iv)  Thaddeus Stevens State School of
    23         Technology
    24         (A)  Original furniture and equipment for
    25             multi-purpose activities center and
    26             trade-technical laboratory                    750,000
    27  (4)  Historical and Museum Commission                   $362,000  <--
    28  (4)  HISTORICAL AND MUSEUM COMMISSION                   $610,000  <--
    29     (i)  Railroad Museum of Pennsylvania
    30         (A)  Original furniture and equipment for
    19970S0188B0389                 - 39 -

     1             locomotive shed DGS 980-3                     220,000
     2     (ii)  Somerset Historical Center
     3         (A)  Original furniture and equipment for
     4             expansion of the visitor center DGS
     5             990-2                                         142,000  <--
     6             990-2                                         150,000  <--
     7     (III)  STATE RECORDS CENTER
     8         (A)  ORIGINAL FURNITURE AND EQUIPMENT FOR
     9             ADDITION TO THE STATE RECORDS CENTER
    10             DGS 948-38                                    240,000
    11  (5)  Department of Military AND VETERANS Affairs      $1,093,000  <--
    12     (i)  Southwestern Veterans Home Allegheny
    13         County
    14         (A)  Original furniture and equipment for
    15             the Southwestern Veterans Home DGS 967-
    16             50                                          1,093,000
    17  (6)  Department of Public Welfare                       $926,000
    18     (i)  Youth Detention Facility at Cresson
    19         (A)  Original furniture and equipment for
    20             maximum security youth detention
    21             facility for western Pennsylvania DGS
    22             587-9                                         463,000
    23     (ii)  Youth Detention Facility at South
    24         Mountain
    25         (A)  Original furniture and equipment for
    26             maximum security youth detention
    27             facility for eastern Pennsylvania DGS
    28             557-13                                        463,000
    29  (7)  State System of Higher Education                $30,937,000
    30     (i)  Bloomsburg State University
    19970S0188B0389                 - 40 -

     1         (A)  Original furniture and equipment for
     2             Centennial Gymnasium DGS 401-51             1,042,000
     3         (B)  Original furniture and equipment for
     4             Navy Hall                                     429,000
     5         (C)  Original furniture and equipment for
     6             Hartline Science Center                       952,000
     7     (ii)  California State University
     8         (A)  Original furniture and equipment for
     9             Dixon Hall DGS 402-51                         684,000
    10         (B)  Original furniture and equipment for
    11             Adamson Stadium DGS 402-52                    140,000
    12         (C)  Original furniture and equipment for
    13             World Culture Building DGS 402-53             613,000
    14         (D)  Original furniture and equipment for
    15             Noss Hall                                     337,000
    16         (E)  Original furniture and equipment for
    17             Steele Auditorium                             572,000
    18     (iii)  Clarion State University
    19         (A)  Original furniture and equipment for
    20             Carlson Library                             2,048,000
    21     (iv)  East Stroudsburg State University
    22         (A)  Original furniture and equipment for
    23             Zimbar Gymnasium DGS 405-52                   407,000
    24         (B)  Original furniture and equipment for
    25             Rosenkrans Hall                               386,000
    26         (C)  Original furniture and equipment for
    27             Eiler-Martin Stadium                          323,000
    28     (v)  Edinboro State University
    29         (A)  Original furniture and equipment for
    30             Loveland Hall DGS 406-47                       30,000
    19970S0188B0389                 - 41 -

     1         (B)  Original furniture and equipment for
     2             Cooper Science DGS 406-51                     234,000
     3         (C)  Original furniture and equipment for
     4             Heather Hall                                  227,000
     5         (D)  Original furniture and equipment for
     6             Butterfield Hall                              494,000
     7         (E)  Original furniture and equipment for
     8             Memorial Auditorium                           250,000
     9     (vi)  Indiana University
    10         (A)  Original furniture and equipment for
    11             Clark Hall DGS 407-64                         333,000
    12         (B)  Original furniture and equipment for
    13             Uhler Hall DGS 407-65                         504,000
    14         (C)  Original furniture and equipment for
    15             John Sutton Hall - Phase I                    738,000
    16         (D)  Original furniture and equipment for
    17             Stabley Library                               463,000
    18         (E)  Original furniture and equipment for
    19             Cogswell Hall                                 889,000
    20         (F)  Original furniture and equipment for
    21             Keith Hall                                    706,000
    22     (vii)  Kutztown State University
    23         (A)  Original furniture and equipment for
    24             Athletic Facility DGS 408-54                  280,000
    25         (B)  Original furniture and equipment for
    26             Science Buildings                           1,866,000
    27         (C)  Original furniture and equipment for
    28             Graduate Center                               360,000
    29     (viii)  Lock Haven State University
    30         (A)  Original furniture and equipment for
    19970S0188B0389                 - 42 -

     1             conversion of Boiler Plant to
     2             Classrooms DGS 409-55                         335,000
     3         (B)  Original furniture and equipment for
     4             Clearfield Campus DGS 409-56                  500,000
     5         (C)  Original furniture and equipment for
     6             Rogers Gym DGS 409-57                         311,000
     7         (D)  Original furniture and equipment for
     8             Court House Annex DGS 409-58                  440,000
     9     (ix)  Mansfield State University
    10         (A)  Original furniture and equipment for
    11             renovation of Gymnasium to Facility for
    12             Instruction DGS 401-51                        499,000
    13         (B)  Original furniture and equipment for
    14             Belknap/Retan, DGS 410-49                     768,000
    15     (x)  Millersville State University
    16         (A)  Original furniture and equipment for
    17             McComsey Hall                                 766,000
    18         (B)  Original furniture and equipment for
    19             Osburn Hall                                   420,000
    20         (C)  Original furniture and equipment for
    21             Stayer Hall                                   684,000
    22         (D)  Original furniture and equipment for
    23             Lyle Hall                                     268,000
    24         (E)  Original furniture and equipment for
    25             Roddy Science Center                          704,000
    26         (F)  Original furniture and equipment for
    27             Gerhart Hall                                   24,000
    28     (xi)  Shippensburg State University
    29         (A)  Original furniture and equipment for
    30             Franklin Science Center                     1,742,000
    19970S0188B0389                 - 43 -

     1         (B)  Original furniture and equipment for
     2             Shippen Hall                                1,581,000
     3         (C)  Original furniture and equipment for
     4             Rowland and Shearer Halls                     517,000
     5         (D)  Original furniture and equipment for
     6             Huber Arts and Counselor Education
     7             Building                                      280,000
     8     (xii)  Slippery Rock State University
     9         (A)  Original furniture and equipment for
    10             Vincent Science Building                    1,641,000
    11         (B)  Original furniture and equipment for
    12             Health Professionals Building               1,479,000
    13     (xiii)  West Chester State University
    14         (A)  Original furniture and equipment for
    15             Swope Hall DGS 414-62                         672,000
    16         (B)  Original furniture and equipment for
    17             Schmucker Science - Phase III               1,584,000
    18         (C)  Original furniture and equipment for
    19             Francis Harvey Green Building                 415,000
    20  Section 5.  Itemization of transportation assistance projects.
    21     (a)  Mass transit.--Additional capital projects in the
    22  category of transportation assistance projects for mass transit
    23  in which an interest is to be acquired or constructed by the
    24  Department of Transportation, its successors or assigns, and to
    25  be financed by the incurring of debt, are hereby itemized,
    26  together with their estimated financial costs, as follows:
    27                                                           Total
    28                                                          Project
    29             Project                                    Allocation
    30  (1)  Beaver County Transit Authority
    19970S0188B0389                 - 44 -

     1     (i)  Purchase of buses and related equipment          185,000
     2     (ii)  Deployment of Intelligent Transportation
     3         System                                            300,000
     4  (2)  Berks Area Reading Transportation Authority
     5     (i)  Phase II - Downtown Transportation Center        367,000  <--
     6     (I)  PHASE II - DOWNTOWN TRANSPORTATION CENTER        867,000  <--
     7     (II)  CONTINUED DESIGN, ENGINEERING AND
     8         CONSTRUCTION OF PHASE II OF THE DOWNTOWN
     9         READING INTERMODAL TRANSPORTATION CENTER          500,000
    10  (2.1)  CAMBRIA COUNTY TRANSIT AUTHORITY
    11     (I)  REHABILITATE FUEL STORAGE AND DISPENSING
    12         SYSTEM                                            196,000
    13  (3)  Capitol Area Transit
    14     (i)  Construction of the West Shore Transfer
    15         Center                                            133,000
    16     (II)  PURCHASE OF TWO 28-PASSENGER TROLLEY                     <--
    17         BUSES                                              93,000
    18  (4)  Centre Area Transportation Authority
    19     (i)  Purchase of service vehicles and automatic
    20         vehicle locator system                            120,000
    21     (II)  PURCHASE OF OFFICE AND MAINTENANCE                       <--
    22         EQUIPMENT INCLUDING SPARE PARTS                    45,000
    23     (III)  PURCHASE OF SMALL TRANSIT BUSES AND
    24         SPARE PARTS                                        50,000
    25     (IV)  PURCHASE OF TEN REPLACEMENT BUSES               500,000
    26  (5)  Chambersburg Transit Authority
    27     (i)  Construction or purchase of
    28         administrative, maintenance and storage
    29         facility                                           84,000
    30  (6)  City of Philadelphia
    19970S0188B0389                 - 45 -

     1     (i)  Locust Street Concourse Improvements -
     2         Construction of Locust Street Concourse
     3         project in the public concourse area under
     4         Locust Street between 12th and 16th
     5         Streets, adjacent to the PATCO Lindenwood
     6         High Speed Line and the 12th and 13th
     7         Streets and 15th and 16th Streets stations        334,000  <--
     8         STREETS AND 15TH AND 16TH STREETS STATIONS      1,000,000  <--
     9     (II)  ERIE AVENUE SUBWAY STATION INTERMODAL
    10         IMPROVEMENTS                                      308,000
    11     (III)  RENOVATIONS AT THE ERIE STATION ON BROAD
    12         STREET SUBWAY                                     317,000
    13  (6.1)  DELAWARE RIVER PORT AUTHORITY
    14     (I)  PURCHASE AND INSTALLATION OF EQUIPMENT FOR
    15         FRONT STREET SUBSTATION FOR TRACTION POWER         92,000
    16  (7)  Erie Metropolitan Transit Authority
    17     (i)  Construction of a park and ride lot in
    18         Northwest Erie                                    167,000
    19     (ii)  Purchase of replacement buses and related
    20         equipment                                         285,000
    21     (III)  PURCHASE OF FOUR REPLACEMENT BUSES,                     <--
    22         SPARE PARTS AND MAINTENANCE ITEMS                 182,000
    23     (IV)  PURCHASE OF SIX MINIBUSES                        49,000
    24  (7.1)  INDIANA COUNTY TRANSIT AUTHORITY
    25     (I)  PURCHASE OF REPLACEMENT TRANSIT BUSES            120,000
    26  (7.2)  LACKAWANNA COUNTY TRANSIT SYSTEM
    27     (I)  PURCHASE OF 13 BUSES AND MAINTENANCE             488,000
    28  (8)  Lehigh and Northampton Transportation
    29     Authority
    30     (i)  Replacement of 25 buses                        1,084,000
    19970S0188B0389                 - 46 -

     1  (8.1)  MID MON VALLEY TRANSIT AUTHORITY                           <--
     2     (I)  PURCHASE OF FIVE SUBURBAN TRANSIT COACHES        233,000
     3  (9)  Port Authority of Allegheny County
     4     (i)  Fiscal Year 1995-1996 Section 9 Program of
     5         Projects                                        4,500,000
     6     (ii)  Fiscal Year 1995-1996 vehicle overhaul        6,000,000  <--
     7     (iii)  Stage II Light Rail Transit Program         13,499,000
     8     (iv) (II)  Fiscal Year 1995-1996 fixed guideway                <--
     9         modernization projects                          3,500,000
    10     (v) (III)  Environmental cleanup                    2,000,000  <--
    11     (vi)  Fiscal Year 1995-1996 Title I ISTEA                      <--
    12         Flexible Funds - PAT Busway Improvements        1,667,000
    13     (vii)  Fiscal Year 1995-1996 Title I ISTEA
    14         Flexible Funds Stage II Light Rail Transit
    15         Program                                         3,333,000
    16     (viii) (IV)  Spine Line                            43,500,000  <--
    17     (ix)  East Busway Extension                        43,500,000  <--
    18     (x)  Bus Procurement                               10,000,000
    19         (V)  AIRPORT BUSWAY                            18,600,000  <--
    20     (xi) (VI)  Fiscal Year 1996-1997 Section 9                     <--
    21         Program of Projects                             4,500,000
    22     (xii)  Fiscal Year 1996-1997 Vehicle Overhaul       6,000,000  <--
    23     (xiii)  Fiscal Year 1997-1998 Vehicle Overhaul      6,000,000
    24         (VII)  FISCAL YEAR 1996-1997 VEHICLE                       <--
    25             OVERHAUL                                    5,000,000
    26         (VIII)  FISCAL YEAR 1997-1998 VEHICLE
    27             OVERHAUL                                   11,000,000
    28     (xiv) (IX)   Fiscal Year 1996-1997 Fixed                       <--
    29         Guideway Modernization                          3,500,000
    30     (xv) (X)  Fiscal Year 1996-1997 Title I ISTEA                  <--
    19970S0188B0389                 - 47 -

     1         Flexible Funds - Busway Improvements              167,000
     2  (10)  Southeastern Pennsylvania Transportation
     3     Authority
     4     (i)  Fiscal Year 1995-1996 Infrastructure,
     5         Safety and Renewal Program                      5,000,000
     6     (ii)  Environmental cleanup                         5,000,000
     7     (iii)  Fiscal Year 1995-1996 Vehicle Overhaul
     8         Program                                        40,000,000
     9     (iv)  Fiscal Year 1995 Section 9 Program            9,521,000
    10     (v)  Frankford Elevated Reconstruction Projects
    11         - Fiscal Year 1995 Requirement                  8,334,000
    12     (vi)  Fiscal Year 1995 Section 3 Fixed Guideway
    13         Program                                         5,469,000
    14     (vii)  Fiscal Year 1995 Section 9 Approved
    15         Federal Highway Flexed Projects                16,784,000
    16     (viii)  Section 3 Approved Highway Flexing          4,098,000
    17     (ix)  Fiscal Year 1995 Section 3 Bus Purchase       1,250,000
    18     (x)  Chester Transportation Center                  1,250,000
    19     (xi)  Cross County Metro - Major Investment
    20         Study                                             251,000
    21     (xii)  Regional Rail Traction Power/Circuit
    22         Breaker                                           146,000
    23     (xiii)  Fiscal Year 1996-1997 Vehicle Overhaul
    24         Program                                        45,000,000
    25     (xiv)  Fiscal Year 1996-1997 Infrastructure
    26         Safety and Renewal Program                     25,000,000
    27     (xv)  Fiscal Year 1996-1997 Environmental
    28         Cleanup                                         5,000,000
    29     (xvi)  Frankford Elevated Reconstruction
    30         Program - Fiscal Year 1996 Section 3            8,334,000
    19970S0188B0389                 - 48 -

     1     (xvii)  Fiscal Year 1996 Section 9 Program of
     2         Projects                                        9,316,000
     3     (xviii)  Fiscal Year 1996 Section 3 Program         4,528,000
     4     (xix)  Fiscal Year 1996 Section 3 Bus
     5         Acquisition                                     1,551,000
     6     (xx)  Fiscal Year 1996 Section 3 Alternative
     7         Fuel Buses                                        311,000
     8     (xxi)  North Philadelphia Transportation
     9         Center                                            621,000
    10     (xxii)  Fiscal Year 1996 Highway Flexing              432,000  <--
    11     (XXII)  FEDERAL HIGHWAY FLEXIBLE FUNDING                       <--
    12         PROGRAM, 1996                                     515,000
    13     (XXIII)  DEVELOPMENT OF RAIL TRACTION POWER
    14         DISTRIBUTION                                      521,000
    15     (XXIV)  COMPLETION OF FRANKFORD ELEVATED
    16         RECONSTRUCTION FINAL SEGMENT INCLUDING
    17         RENOVATING FIVE STATIONS, 1997 SECTION 3        8,333,000
    18     (XXV)  ACQUISITION OF BUSES, AUTOMATIC TRAIN
    19         CONTROLS, UNDERGROUND STORAGE TANKS, 1997
    20         SECTION 9                                       8,833,000
    21     (XXVI)  INFRASTRUCTURE FOR MARKET/FRANKFORD
    22         LINE, BROAD STREET SIGNAL SYSTEM AND
    23         STATION ACCESSIBILITY, 1997 SECTION 3           5,666,000
    24     (XXVII)  PURCHASE OF 200 ADVANCED DESIGN
    25         ACCESSIBLE BUSES, 1997 SECTION 3                3,333,000
    26     (XXVIII)  PURCHASE OF ALTERNATIVE FUELS BUSES
    27         FOR ROUTES IN BUCKS, CHESTER AND MONTGOMERY
    28         COUNTIES, 1997 SECTION 3                        1,667,000
    29     (XXIX)  CONTINUED CONSTRUCTION OF
    30         TRANSPORTATION CENTER IN NORTH
    19970S0188B0389                 - 49 -

     1         PHILADELPHIA                                    1,000,000
     2     (XXX)  CONTINUED RECONSTRUCTION OF THE
     3         FRANKFORD ELEVATED LINE, 1996 SECTION 3
     4         PROGRAM, SPECIFICALLY STATION
     5         ACCESSIBILITY, FLEET RENEWAL, RECONSTRUCT
     6         MARKET ELEVATED                                 4,528,000
     7  (11)  Shenango Valley Shuttle Service
     8     (i)  Construction of a new transit center and
     9         park and ride facility                            100,000
    10     (II)  PURCHASE OF TWO TRANSIT BUSES                    67,000  <--
    11  (12)  Red Rose Transportation Authority
    12     (i)  Construction of a rail station along
    13         Amtrak Line in eastern Lancaster County            68,000
    14  (13)  Williamsport Bureau of Transportation
    15     (i)  Construction of Williamsport Trade and                    <--
    16         Transit Intermodal Center                         500,000
    17     (I)  CONSTRUCTION OF A CENTRAL BUSINESS                        <--
    18         DISTRICT TRANSPORTATION CENTER                    683,000
    19  (13.1)  YORK AREA TRANSPORTATION AUTHORITY
    20     (I)  CONSTRUCTION OF A BUS TRANSFER CENTER            455,000
    21  (14)  Class 3, Class 4 and Community Public
    22     Transportation Systems
    23     (i)  Projects, including, but not limited to,
    24         purchase of vehicles, vehicle overhaul,
    25         purchase of facilities, facility
    26         renovations, other capital equipment and
    27         associated capital items for Fiscal Year
    28         1996-1997                                       7,500,000
    29  (15)  Department of Transportation
    30     (i)  Purchase of rail passenger equipment and
    19970S0188B0389                 - 50 -

     1         rail infrastructure improvements                1,800,000  <--
     2         RAIL INFRASTRUCTURE IMPROVEMENTS                2,600,000  <--
     3     (II)  REHABILITATION OF RAIL STATIONS ALONG
     4         KEYSTONE CORRIDOR                               1,500,000
     5     (b)  Rural and intercity rail.--Additional capital projects
     6  in the category of transportation assistance projects for rural
     7  and intercity rail service projects to be constructed or with
     8  respect to which an interest is to be acquired by the Department
     9  of Transportation, its successors or assigns, and to be financed
    10  by the incurring of debt, are hereby itemized, together with
    11  their respective estimated financial costs, as follows:
    12                                                           Total
    13                                                          Project
    14             Project                                    Allocation
    15  (1)  Allegheny County
    16     (i)  Purchase of the Wheeling and Lake Erie
    17         Railway                                        12,000,000
    18     (ii)  Construction of railroad connection to
    19         interchange Wheeling and Lake Erie traffic
    20         to Pittsburgh Industrial Railroad to
    21         reestablish CSXT interchange South of
    22         Bridgeville between Milepost 57 and
    23         Milepost 61                                     2,500,000
    24     (iii)  Wheeling and Lake Erie Railroad line
    25         rehabilitation                                  1,500,000
    26     (iv)  Purchase of a portion of West End Branch
    27         of Wheeling Lake Erie Railway Right-of-way
    28         to accommodate West End Circle Project of
    29         PennDOT and construction of railroad
    30         connection to interchange Wheeling and Lake
    19970S0188B0389                 - 51 -

     1         Erie traffic to Pittsburgh Industrial
     2         Railroad to reestablish CSXT interchange
     3         south of Bridgeville between Milepost 57
     4         and Milepost 61                                12,500,000
     5     (v)  Purchase of West End Branch of Wheeling
     6         Lake Erie Railway from Steuben Street to
     7         Wabash Tunnel to accommodate Banksville
     8         Interchange at 1-279 and the development of
     9         HOV corridor                                    6,500,000
    10     (vi)  Purchase Wheeling and Lake Erie Railway
    11         main right-of-way from Rook Yard (Milepost
    12         56 to Longview Milepost 46) to create two
    13         new transportation corridors to downtown
    14         Pittsburgh                                     18,000,000
    15     (vii)  Wheeling & Lake Erie Railway Company
    16         (A)  Replacement of deteriorated crossties
    17             on former P & WV rail line that runs
    18             for 38.6 miles between Pierce and
    19             Connellsville to allow for intermodal
    20             traffic or expected volume of iron ore
    21             trains                                        800,000
    22             (Base Project Allocation - $720,000)
    23             (Design and Contingencies - $80,000)
    24     (viii)  Development of intermodal
    25         transportation and distribution facility in
    26         Leetsdale                                       1,250,000
    27     (IX)  PITTSBURGH, ALLEGHENY AND MCKEES ROCKS                   <--
    28         RAILROAD
    29         (A)  MAINTENANCE OF INFRASTRUCTURE ALONG
    30             TRACKAGE                                      300,000
    19970S0188B0389                 - 52 -

     1  (2)  ALLEGHENY AND WASHINGTON COUNTIES
     2     (I)  PITTSBURGH INDUSTRIAL RAILROAD
     3         (A)  MAINTENANCE OF INFRASTRUCTURE AT
     4             VARIOUS POINTS ALONG TRACKAGE FROM
     5             YOUNGWOOD TO FAIRCHANCE                       300,000
     6  (3)  ALLEGHENY, WESTMORELAND, WASHINGTON AND
     7     FAYETTE
     8     (I)  FORMER PITTSBURGH WEST VIRGINIA LINE
     9         (A)  REPLACEMENT OF DETERIORATED CROSSTIES
    10             ON 38.6 MILES OF TRACKAGE                     600,000
    11  (4)  BEAVER COUNTY
    12     (I)  OHIO AND PENNSYLVANIA RAILROAD
    13         (A)  REHABILITATION OF SEVEN MILES OF RAIL
    14             LINE                                          450,000
    15  (2) (5) Berks County                                              <--
    16     (i)  Reading, Blue Mountain and Northern
    17         Railroad
    18         (A)  Construction of connection from USRA
    19             Line No. 197b to Reading & Northern
    20             Railroad at Temple                            800,000
    21  (3) (6)  Blair County                                             <--
    22     (i)  Morrison's Cove Railroad
    23         (A)  Replace three sections of existing
    24             track with heavy rail for approximately
    25             3.0 miles to handle existing traffic on
    26             the Morrison's Cove Railroad and the
    27             Martinsburg Branch; replace track
    28             switches; upgrade three grade
    29             crossings                                     396,000
    30  (4) (7)  Bucks County                                             <--
    19970S0188B0389                 - 53 -

     1     (i)  Bristol Industrial Park
     2         (A)  Construction of industrial terminal
     3             railway extension                             125,000
     4     (II)  USX FAIRLESS INDUSTRIAL PARK                             <--
     5         (A)  UPGRADE OF INTERCHANGE POINTS                600,000
     6  (5) (8)  Butler County                                            <--
     7     (i)  Buffalo and Pittsburgh Railroad
     8         (A)  Construction of new rail side track
     9             and four new turnouts                         200,000
    10         (B)  Johnsonburg Bypass rail connection
    11             between Buffalo and Pittsburgh Railroad
    12             and the Allegheny and Eastern Railroad      3,200,000
    13         (C)  Mainline from Punxsutawney to Falls
    14             Creek                                       1,000,000
    15     (ii)  Genesee and Wyoming Railroad
    16         (A)  Butler to Bruin                            1,800,000
    17  (9)  CARBON COUNTY                                                <--
    18     (I)  CHESTNUT RIDGE RAILWAY
    19         (A)  REHABILITATION OF YARD TRACKAGE AT THE
    20             ZINC CORPORATION FACILITY                     248,000
    21  (10)  CARBON, LUZERNE, LACKAWANNA AND WYOMING
    22     (I)  LEHIGH MIDDLE CLUSTER
    23         (A)  REHABILITATION OF 93 MILES OF TRACK          450,000
    24  (6) (11)  Carbon and Schuylkill Counties                          <--
    25     (i)  Rehabilitation of railroad tracks
    26         connecting the Boroughs of Lansford and
    27         Tamaqua                                           700,000
    28  (7) (12)  Centre County                                           <--
    29     (i)  SEDA-COG Whiterock Quarry track
    30         (A)  Track rehabilitation and construction      1,400,000
    19970S0188B0389                 - 54 -

     1  (8) (13)  Chester County                                          <--
     2     (i)  Brandywine Valley Railroad
     3         (A)  Elevate track and construct retaining
     4             wall to prevent continual washouts from
     5             Brandywine Creek in South Coatesville         405,000
     6  (9) (14)  Clinton, Centre and Blair Counties                      <--
     7     (i)  SEDA-COG Joint Rail Authority
     8         (A)  Nittany and Bald Eagle Railroad
     9             Rehabilitation                              3,000,000
    10         (B)  Commonwealth supported rail welding
    11             project                                     3,000,000
    12  (15)  DAUPHIN COUNTY                                              <--
    13     (I)  REPLACEMENT OF RAIL BRIDGE OVER A CANAL ON
    14         FRONT STREET IN BOROUGH OF STEELTON               188,000
    15  (10) (16)  Elk County                                             <--
    16     (i)  Genesee and Wyoming Railroad
    17         (A)  Johnsonburg to New York State Line         3,200,000
    18  (11) (17)  Erie and Crawford Counties                             <--
    19     (i)  Allegheny and Eastern Railroad, Inc.
    20         (A)  From Milepost 8 to Milepost 19,
    21             rehabilitation and upgrade of 11 miles
    22             of Allegheny and Eastern Railroad used
    23             for traffic moving to or from Conrail
    24             interchange at Erie. Includes
    25             rehabilitation of rails, new ties and
    26             other roadbed improvements                    275,000
    27     (ii)  Northwestern Pennsylvania Railroad
    28         (A)  Upgrade of rail line to Federal
    29             Railway Administration Class II
    30             condition                                     250,000
    19970S0188B0389                 - 55 -

     1  (12) (18)  Fayette County                                         <--
     2     (i)  Completion of CSX rail acquisition in
     3         Fayette County                                  1,800,000
     4     (ii)  Southwest Pennsylvania Rail
     5         Rehabilitation Program                          1,200,000
     6     (iii)  Fay-Penn Transportation Company
     7         (A)  Rehabilitation of 21.6 miles of rail
     8             line from Fair Chance Business Park to
     9             Mt. Pleasant in Westmoreland County           750,000
    10  (13) (19)  Indiana County                                         <--
    11     (i)  Genesee and Wyoming Railroad
    12         (A)  Punxsutawney to Falls Creek                1,000,000
    13     (ii)  Pittsburgh and Shawmut Railroad
    14         (A)  Rehabilitation of Pittsburgh and
    15             Shawmut Railroad between Driftwood and
    16             Kittanning, including replacement of
    17             21,797 feet of rail, replacement of
    18             deteriorating ties, resurface rail bed,
    19             renew road crossings and other
    20             miscellaneous rehabilitation                1,500,000
    21  (20)  LANCASTER COUNTY                                            <--
    22     (I)  CONSTRUCTION OF NEW 1,262-FOOT SIDING FOR
    23         COLD STORAGE FACILITY                             125,000
    24  (14) (21)  Mifflin County                                         <--
    25     (i)  SEDA-COG Joint Rail Authority
    26         (A)  Juniata Valley Railroad
    27             Reconstruction                              3,000,000
    28  (15) (22)  Monroe County                                          <--
    29     (i)  Monroe County Railroad Authority
    30         (A)  Rehabilitation of 17 miles of rail
    19970S0188B0389                 - 56 -

     1             line to FRA Class III standards
     2             including purchase and installation of
     3             new crossties, raise, line and surface
     4             the entire 17 mile rail line and
     5             purchase and install relay rail on
     6             various curves on the rail line               861,000
     7         (B)  Purchase of railroad right-of-way and
     8             relay rail on approximately 1.5 miles
     9             including a bridge over the Delaware
    10             River to allow the final linkage of
    11             track between Pennsylvania and New
    12             Jersey to reopen the passenger and
    13             freight corridor between the Pocono
    14             Mountain region of Pennsylvania and New
    15             York City                                     985,000
    16  (16) (23)  Montgomery County                                      <--
    17     (i)  Upper Merion and Plymouth Railroad
    18         (A)  Add three storage tracks in Plymouth
    19             Township and construct a holding/run-a-
    20             round track in Upper Merion Township at
    21             Swedeland Yard                                420,000
    22     (ii)  Lukens, Inc.
    23         (A)  Upgrade Lukens Steel Mainline Rail
    24             facilities with ties, rails, switch
    25             appurtenances and roadbed upgrade from
    26             East to West end of plant                     440,000
    27  (24)  NORTHAMPTON COUNTY                                          <--
    28     (I)  CONSTRUCTION OF SIDING AT TODD HELLER
    29         SITE                                              130,000
    30  (17) (25)  Northumberland, Montour and Columbia                   <--
    19970S0188B0389                 - 57 -

     1     Counties
     2     (i)  SEDA-COG Joint Rail Authority
     3         (A)  Stabilize track for the North Shore
     4             Railroad to maintain Class II service         375,000
     5         (B)  REPLACEMENT OF UP TO 2,700 CROSSTIES,                 <--
     6             RECONSTRUCTION OF TWO GRADE CROSSINGS
     7             AND REPLACEMENT OF BRIDGE TIMBERS             300,000
     8  (18) (26)  Philadelphia County                                    <--
     9     (i)  West Philadelphia Transportation Center
    10         (A)  Rehabilitation and transformation of
    11             the old 52nd and Lancaster Streets rail
    12             station into an intermodal
    13             transportation center                       2,810,000
    14             (Base Construction Allocation -
    15             $2,300,000)
    16             (Design and Contingencies - $510,000)
    17     (ii)  Delaware and Hudson Railway Company
    18         (A)  Philadelphia Naval Base track
    19             rehabilitation, rehabilitate running
    20             track from CP Penrose to Naval Yard
    21             switch and running track and adjacent
    22             bulk loading facility, as well as four
    23             stub tracks west of Roundhouse                550,000
    24             (Base Project Allocation - $495,000)
    25             (Design and Contingencies - $55,000)
    26  (19) (27)  Schuylkill County                                      <--
    27     (i)  Reading, Blue Mountain and Northern
    28         Railroad
    29         (A)  Rehabilitate Tamaqua and Mahanoy
    30             Tunnels, including strengthening of
    19970S0188B0389                 - 58 -

     1             roof structure, installation of
     2             drainage system and renewing the rail,
     3             ties and ballast in the 900-foot
     4             Tamaqua Tunnel located 2 miles north of
     5             Tamaqua and in the 3,500-foot Mahanoy
     6             Tunnel located near Buck Mountain             640,000
     7  (28)  WARREN COUNTY                                               <--
     8     (I)  REPLACEMENT OF CROSSTIES FROM WARREN
     9         COUNTY TO THE WEST                                300,000
    10  (20) (29)  Washington County                                      <--
    11     (i)  Wheeling & Lake Erie Railway Company
    12         (A)  Replace, on accelerated safety basis,
    13             deck bridge ties and miscellaneous
    14             repairs on Mingo Creek Valley Bridge
    15             and Pigeon Creek Valley Bridge near
    16             Charleroi to accommodate current
    17             traffic and future intermodal traffic
    18             on Wheeling Main Line between Rook Yard
    19             and Connellsville                             375,000
    20             (Base Project Allocation - $337,000)
    21             (Design and Contingencies - $38,000)
    22         (B)  Emergency repairs needed to support
    23             rail infrastructure damaged by water-
    24             related hydraulic blowout along 200
    25             feet of side hill fill near Charleroi
    26             and to repair catastrophic
    27             deterioration of subgrade east of
    28             Pittsburgh Rook Yard, including
    29             rebuilding of lost subgrade, repair of
    30             subsidence of various other fills and
    19970S0188B0389                 - 59 -

     1             other rehabilitations to restore
     2             customer railroad service and railroad
     3             connections east of Pittsburgh                475,000
     4             (Base Project Allocation - $427,000)
     5             (Design and Contingencies - $48,000)
     6  (21) (30)  Westmoreland County                                    <--
     7     (i)  Westmoreland County Industrial Development
     8         Corporation
     9         (A)  Construction of a spur from site of
    10             proposed Sony Glass Plant                     163,000
    11         (B)  Greensburg Cluster/CSX -
    12             reconstruction of rail lines                  500,000
    13  (22) (31)  York County                                            <--
    14     (i)  Maryland and Pennsylvania Railroad
    15         (A)  Rehabilitation of Poorhouse Yard rail
    16             and turnouts                                  424,000
    17         (B)  Accelerated rehabilitation of 2.5
    18             miles of original rail on East Branch
    19             to avoid derailments and eliminate
    20             damage to customer shipments,
    21             including, but not limited to, new
    22             rail, crossties, improved drainage
    23             system and new ballast                        704,000
    24     (ii)  Emons Logistics Services, Inc.
    25         (A)  Installation of new track system,
    26             environmental controls, heating, paving
    27             and the construction of bulk intermodal
    28             transfer terminal on York Rail
    29             including facilities to prevent
    30             contamination of project and to protect
    19970S0188B0389                 - 60 -

     1             from inclement weather                      1,275,000
     2     (iii)  York Rail
     3         (A)  Construction of rail siding to serve
     4             new warehouse of York County Industrial
     5             Development Corporation                       165,000
     6  (23) (32)  Buffalo and Pittsburgh Railroad                        <--
     7     (i)  Additional funds for rehabilitation of
     8         various mainline segments of Buffalo and
     9         Pittsburgh Railroad to Class III and/or
    10         Class II standards
    11         (A)  Butler to Bruin mainline track road
    12             crossing and bridge work
    13             rehabilitation                              3,000,000
    14         (B)  Mainline from Falls Creek (DuBois) to
    15             Ridgeway                                    2,300,000
    16         (C)  Mainline from Ridgeway to Johnsonburg
    17             - relocation of B&P track and
    18             consolidation of traffic from
    19             Johnsonburg to Ridgway                      3,925,000
    20         (D)  Mainline from Eidenau to Punxsutawney
    21             - Phase 2                                   2,575,000
    22  (33)  PITTSBURGH AND SHAWMUT RAILROAD, INC.                       <--
    23     (I)  REHABILITATION OF RAIL INFRASTRUCTURE AND
    24         RAILROAD TRACKS OF VARIOUS SEGMENTS OF THE
    25         PITTSBURGH AND SHAWMUT RAILROAD, INC.             303,000
    26  (34)  DEPARTMENT OF TRANSPORTATION
    27     (I)  REHABILITATION AND ANY OTHER REPAIR OF
    28         FLOOD-RELATED DAMAGE TO RAILROAD LINES.
    29         THIS AUTHORIZATION SHALL BE ALLOCATED BY
    30         THE DEPARTMENT OF TRANSPORTATION TO THE
    19970S0188B0389                 - 61 -

     1         FOLLOWING RAILROADS: BUFFALO & PITTSBURGH
     2         RAILROAD COMPANY; HOLIDAYSBURG & ROARING
     3         SPRINGS RAILROAD; EVERETT RAILROAD COMPANY;
     4         TOWANDA & MONROETON RAILROAD; ALLEGHENY &
     5         EASTERN RAILROAD, INC.; CHESTNUT RIDGE
     6         RAILWAY COMPANY; NITTANY & BALD EAGLE
     7         RAILROAD COMPANY; NORTH SHORE RAILROAD
     8         COMPANY; BLUE RIDGE INDUSTRIES; LUZERNE
     9         COUNTY RAIL CORPORATION; PENNSYLVANIA POWER
    10         & LIGHT; SHAMOKIN VALLEY RAILROAD COMPANY;
    11         STOURBRIDGE RAILROAD COMPANY; WELLSBORO &
    12         CORNING RAILROAD COMPANY; UNION COUNTY
    13         INDUSTRIAL RAILROAD COMPANY; OIL CREEK &
    14         TITUSVILLE LINES, INC.; SOUTHWEST
    15         PENNSYLVANIA RAILROAD COMPANY; AND MARYLAND
    16         & PENNSYLVANIA RAILROAD COMPANY                 1,100,000
    17     (c)  Air transportation.--Additional capital projects in the
    18  category of transportation assistance projects for air
    19  transportation service to which an interest is to be acquired by
    20  the Department of Transportation, its successors or assigns, and
    21  to be financed by the incurring of debt are hereby itemized,
    22  together with their respective estimated financial costs, as
    23  follows:                                                 Total
    24                                                          Project
    25             Project                                    Allocation
    26  (1)  Connellsville Airport, Fayette County
    27     (i)  Rehabilitation of runway, taxiway and
    28         runway lighting                                    35,000
    29     (ii)  Expansion of current runway and other
    30         airport improvements                           17,000,000
    19970S0188B0389                 - 62 -

     1  (2)  Clearfield-Jefferson County Regional Airport
     2     Authority
     3     (i)  Renovate Beechwoods Administration
     4         Building                                          150,000
     5     (ii)  Upgrade and renovate crash, fire and
     6         rescue building                                    15,000
     7     (iii)  Renovate terminal building                      66,000
     8     (iv)  Renovate Mesa hangar                            125,000
     9     (v)  Remove contaminated soil at fuel farm            100,000
    10     (vi)  Acquisition of 1,000-gallon jet fuel
    11         truck                                              80,000
    12     (vii)  Acquisition of disabled passenger lift          20,000
    13     (viii)  Construction of access road to new T-
    14         hangar                                             50,000
    15  (3)  St. Marys Airport Authority
    16     (i)  Refurbish existing hangars                        89,000
    17     (ii)  Purchase of grass cutting and landscape
    18         equipment                                         100,000
    19     (iii)  Construction of new commercial hangar          125,000
    20     (iv)  Construction of new T-hangar                    120,000
    21     (v)  Construction of new terminal building            160,000
    22     (vi)  Maintenance equipment                             7,000
    23     (vii)  Storage building and sidewalks                   7,000
    24     (viii)  Unicom radios and weather station               7,000
    25     (ix)  Sewage system and utilities                     300,000
    26     (x)  Rehab tiedown apron and construct T-
    27         hangar                                             10,000
    28     (xi)  Storm water management plan                       3,000
    29     (xii)  Snow removal equipment                           7,000
    30     (xiii)  Runway reconstruction and access road
    19970S0188B0389                 - 63 -

     1         relocation                                         38,000
     2     (xiv)  Extend runway 700 feet                          50,000
     3     (xv)  Master plan update AWO5 III                      10,000
     4  (4)  Bradford Regional Airport Authority
     5     (i)  Construct new T-hangar                           300,000
     6     (ii)  Construct corporate hangar                      300,000
     7     (iii)  Replace door on corporate hangar                28,000
     8     (iv)  Expand snow equipment building, purchase
     9         snow plow                                          12,000
    10  (5)  Corry Lawrence Airport Authority
    11     (i)  Perimeter fencing and snow removal
    12         equipment                                          22,000
    13     (ii)  Construct new aircraft hangar                   198,000
    14     (iii)  Construct addition to terminal building         83,000
    15     (iv)  Seal coat runway, taxiways, apron and
    16         paint markings                                     60,000
    17     (v)  Expand parking area                               28,000
    18     (vi)  Property acquisition                             35,000
    19     (vii)  Snow removal equipment                           4,000
    20     (viii)  Purchase backhoe                               21,000
    21     (ix)  Construct hangar taxiway                          8,000
    22     (x)  Master plan update                                 1,000
    23     (xi)  Rotating beacon                                   4,000
    24     (xii)  Construct hangars                              263,000
    25     (xiii)  Purchase crack sealing machine                 26,000
    26     (xiv)  Obstruction removal                              2,000
    27  (6)  Fayette County Airport Authority
    28     (i)  Expansion Project                             17,000,000
    29     (ii)  Fayette County Air Transportation
    30         Strategic Planning Study                          100,000
    19970S0188B0389                 - 64 -

     1  (7)  Reading Regional Airport Authority
     2     (i)  Renovation and widening of Leisz's Bridge
     3         and Mitchell Roads                              1,000,000
     4     (ii)  Construction of a noise barrier wall
     5         around the run-up area                             50,000
     6     (iii)  Purchase airfield turf maintenance
     7         equipment                                         125,000
     8     (iv)  Purchase airfield and property CAD
     9         system                                             25,000
    10  (8)  Westmoreland County Airport, Westmoreland
    11     County
    12     (i)  Modernization of the main terminal
    13         building and expansion of the commercial
    14         service wing and parking                        1,800,000
    15  (9)  Lancaster Airport
    16     (i)  Terminal expansion                               337,000
    17  (10)  Bedford County Air Industrial Authority
    18     (i)  Lengthening of runway/taxiway and building
    19         of an access road                                 378,000
    20  (11)  Blair County Airport Authority
    21     (i)  Lengthening and strengthening of runways      22,000,000
    22  (12)  Huntingdon County
    23     (i)  Acquisition and improvements to the
    24         existing airport                                1,200,000
    25  (13)  Venango Regional Airport
    26     (i)  Property acquisition                              35,000
    27     (ii)  Snow removal equipment                            4,000
    28     (iii)  Purchase backhoe                                21,000
    29     (iv)  Construct hangar taxiway                          8,000
    30     (v)  Master plan update                                 1,000
    19970S0188B0389                 - 65 -

     1     (vi)  Rotating beacon                                   4,000
     2     (vii)  Construct hangars                              263,000
     3     (viii)  Purchase crack sealing machine                 26,000
     4     (ix)  Obstruction removal                               2,000
     5  (14)  Allegheny County Airport
     6     (i)  Rehabilitation of runway 5-23, hangar 40,
     7         taxiways and construction of new hangars        5,575,000
     8  (15)  Beaver County Airport
     9     (i)  Navigational aids update - relocate
    10         compass rose, lighted wind cone, beacon and
    11         AWOS                                              200,000
    12     (ii)  High intensity runway lights and medium
    13         intensity taxiway lights                          400,000
    14     (iii)  Construction of T-hangar - four to ten
    15         single-hangar and twin-hangar units               920,000
    16     (iv)  Terminal expansion                              500,000
    17     (v)  Resurface main apron                             600,000
    18     (vi)  Apron and taxiway rehabilitation                667,000
    19     (vii)  Storm water management system                  556,000
    20     (viii)  Resurface parking areas                       200,000
    21  Section 6.  Itemization of redevelopment assistance projects.
    22     Additional capital projects in the category of redevelopment
    23  assistance projects for capital grants by the Department of
    24  Community and Economic Development, its successors or assigns,
    25  authorized under the provisions of the act of May 20, 1949
    26  (P.L.1633, No.493), known as the Housing and Redevelopment
    27  Assistance Law, and redevelopment assistance capital projects
    28  and to be financed by the incurring of debt, are hereby
    29  itemized, together with their estimated financial costs, as
    30  follows:
    19970S0188B0389                 - 66 -

     1                                                           Total
     2                                                          Project
     3             Project                                    Allocation
     4  (1)  Adams County
     5     (i)  Development of historic pathway on Lincoln
     6         Square, Borough of Gettysburg                   5,100,000
     7  (2)  Allegheny County
     8     (i)  City of Pittsburgh
     9         (A)  Senator John Heinz Pittsburgh Regional
    10             History Center - Completion of the
    11             development of Senator John Heinz
    12             Pittsburgh Regional History Center          5,000,000
    13         (B)  Pittsburgh Technology Center Site
    14             Development - Continued development and
    15             expansion of the Pittsburgh Technology
    16             Center to include the LTV site on the
    17             Southside                                  38,000,000
    18         (C)  Three Rivers Stadium enhancements         75,000,000
    19         (D)  Greater Pittsburgh Community Food
    20             Bank                                        1,000,000
    21         (E)  Fifth Avenue, Forbes Avenue and Wood
    22             Street, infrastructure acquisition,
    23             demolition, reconstruction and public
    24             space improvements                         20,000,000
    25         (F)  Nine Mile Run, environmental
    26             reclamation and site preparation           20,000,000
    27         (G)  Life Science Development Incubator,
    28             infrastructure improvements                10,000,000
    29         (H)  Software Product Development Center,
    30             land acquisition and infrastructure
    19970S0188B0389                 - 67 -

     1             improvements                               10,000,000
     2         (I)  Rockwell Site Development                 10,000,000
     3         (J)  Byham Theater, Phase III renovation        3,500,000
     4         (K)  For the acquisition and renovation of
     5             the existing Coraopolis Rail Station
     6             for the Coraopolis Railroad Museum          3,000,000
     7         (L)  Mattress Factory - Federal North
     8             Project - Transformation of an adult
     9             theater adjacent to Allegheny General
    10             Hospital to provide for an area
    11             integrating arts, education, commerce
    12             and residences                              3,500,000
    13         (M)  Hot metal bridge reconstruction and
    14             rehabilitation to connect Pittsburgh
    15             Technology Center to the LTV site on
    16             the south side                              2,500,000
    17         (N)  Pittsburgh African-American Museum         1,500,000
    18         (O)  Pennsylvania Public Law Center             5,500,000
    19         (P)  Acquisition and rehabilitation of
    20             property for programmatic space on
    21             Jacksonia Street and Sampsonia Way for
    22             the Mattress Factory Art Institution          500,000
    23         (Q)  REHABILITATION OF PITTSBURGH BALLET                   <--
    24             THEATER TRAINING FACILITY                     300,000
    25     (ii)  City of Duquesne
    26         (A)  Cochrandale Redevelopment,
    27             acquisition, demolition and site
    28             development                                 1,200,000
    29         (B)  Kennywood Site Development,
    30             acquisition, and site development           2,000,000
    19970S0188B0389                 - 68 -

     1         (C)  Plaza Redevelopment, acquisition and
     2             site development                            1,000,000
     3         (D)  City Center of Duquesne entrance, site
     4             improvements                                  600,000
     5     (iii)  County projects
     6         (A)  Tech World Site Development -
     7             Development of a technology center near
     8             the Greater Pittsburgh International
     9             Airport, including site clearance,
    10             remediation and infrastructure to
    11             support research and development, as
    12             well as light industrial developments     190,000,000
    13         (B)  Homestead Redevelopment/Site
    14             Development - New onsite access
    15             roadways and related infrastructure to
    16             support private development                 7,000,000
    17         (C)  Industrial Center of McKeesport Pipe
    18                 Mill - Redevelopment of the Pipe
    19                 Mill building on the site of former
    20                 USX McKeesport National Works into
    21                 a multitenant industrial and
    22                 business facility                       5,060,000
    23         (D)  Keystone Commons Braddock Avenue
    24                 Intermodal Facility - Development
    25                 of an intermodal facility to
    26                 relieve traffic and parking
    27                 congestion on the redevelopment
    28                 site of the former Westinghouse
    29                 East Pittsburgh Plant                   4,000,000
    30         (E)  Working Steel Museum - Construction of
    19970S0188B0389                 - 69 -

     1             a tourism attraction reflecting the
     2             history of steelmaking in southwestern
     3             Pennsylvania                               25,000,000
     4         (F)  McKees Point II - Site improvements at
     5             McKees Point to enhance improvements
     6             undertaken in Phase I                       1,500,000
     7         (G)  301 Fifth Avenue Building - Renovation
     8             activities on publicly owned building
     9             in downtown McKeesport that serves as a
    10             center for social and public services
    11             and job creation                            1,000,000
    12         (H)  Lysle Boulevard and Sixth Avenue
    13             Parking Garages - Renovation of two
    14             multistory parking garages in downtown
    15             McKeesport                                  1,500,000
    16         (I)  Neighborhood Preservation
    17             Market/Walnut Corridor - Acquisition of
    18             blighted, tax delinquent properties in
    19             the Market/Walnut Corridor, demolition
    20             of blighted structures and abandoned
    21             public housing facility in conjunction
    22             with State Route 148 improvements,
    23             Yough River Trail and new development
    24             in this area                                1,000,000
    25         (J)  Development initiatives at various
    26             sites in Allegheny County/Pittsburgh
    27             International Airport Area                 50,000,000
    28         (K)  Steel Valley Redevelopment Project         6,262,000
    29         (L)  Findlay Connector                          3,000,000
    30         (M)  Pittsburgh International Airport
    19970S0188B0389                 - 70 -

     1             enhanced transit system                     5,000,000
     2         (N)  Carnegie Mall Project                      1,600,000
     3         (O)  Parkway West and Interstate 79
     4             interchange completion                     15,000,000
     5         (P)  RENOVATIONS TO SOLDIERS AND SAILORS                   <--
     6             MEMORIAL HALL OF ALLEGHENY COUNTY           5,000,000
     7     (iv)  West Mifflin Borough
     8         (A)  Nobile Drive Sanitary Sewer                  500,000
     9     (v)  Wilkinsburg Borough
    10         (A)  Renaissance Development Area                 300,000
    11     (vi)  Millvale Borough
    12         (A)  Millvale riverfront development            2,200,000
    13     (VII)  SCOTT TOWNSHIP                                          <--
    14         (A)  SEWER REPAIR ALONG SPRING VALLEY ROAD
    15             AND ROCK HILL ROAD                          5,895,000
    16  (2.1)  BEDFORD COUNTY
    17         (A)  CONSTRUCT A TRANSPORTATION CENTER/
    18             HANDICAPPED ACCESSIBLE PARKING FACILITY
    19             AND DEVELOP COUNTY OFFICE SPACE ON
    20             UPPER LEVEL                                 3,500,000
    21  (3)  Berks County
    22     (i)  City of Reading
    23         (A)  Improvements to municipal stadium            200,000
    24  (4)  Blair County
    25     (i)  County Projects
    26         (A)  Construction and Development of Blair
    27             County baseball field and stadium          10,000,000
    28     (ii)  SR 0220
    29         (A)  Improve access from SR 0220 along Ski
    30             Gap Road to Blue Knob                      11,000,000
    19970S0188B0389                 - 71 -

     1     (iii)  Tyrone Borough
     2         (A)  Tyrone Historic Railroad Park - Phase
     3             I                                              75,000
     4     (iv)  Altoona-Blair County Development
     5         Corporation
     6         (A)  Multi-Modal Industrial Park
     7             Distribution Center                         3,000,000
     8         (B)  Altoona-Blair County Air Park - Air
     9             Freight/Air Cargo Distribution
    10             Facilities                                  3,500,000
    11         (C)  Business/Research Park - I-99 Corridor
    12             Location                                    2,500,000
    13         (D)  Entrepreneurial/Business Resource
    14             Center                                      2,500,000
    15  (4.1)  CAMBRIA COUNTY                                             <--
    16     (I)  ELDER TOWNSHIP
    17         (A)  CONSTRUCTION OF ACCESS ROAD TO THE
    18             HASTINGS INDUSTRIAL PARK                      600,000
    19     (II)  CITY OF JOHNSTOWN
    20         (A)  RENOVATION OF CAMBRIA COUNTY WAR
    21             MEMORIAL                                   15,000,000
    22  (5)  Chester County
    23     (i)  Tredyffrin Township
    24         (A)  Rehabilitation of Strafford Railroad
    25             Station                                       450,000
    26  (5.1)  CLARION COUNTY                                             <--
    27     (I)  SLIGO BOROUGH
    28         (A)  DRILL WELL AND REPLACE MAIN WATER
    29             LINE                                          170,000
    30     (II)  PAINT TOWNSHIP
    19970S0188B0389                 - 72 -

     1         (A)  WATER LINE EXTENSION                       1,400,000
     2         (B)  SEWER LINE EXTENSION                       1,600,000
     3     (III)  CITY OF RIMERSBURG
     4         (A)  REPAIR EXISTING WATER STORAGE TANK,
     5             ERECT A LARGER TANK AND REPLACE WATER
     6             LINES                                         700,000
     7         (B)  REPLACE DETERIORATED SEWER LINES AND
     8             MANHOLES                                      550,000
     9  (6)  Dauphin County
    10     (i)  City of Harrisburg
    11         (A)  Construction and Development of the
    12             Pennsylvania Sports Hall of Fame
    13             Museum, City Island, Harrisburg             5,525,000
    14  (7)  Erie County
    15     (i)  City of Erie
    16         (A)  Construction of the Pennsylvania
    17             Aquarium                                   15,000,000
    18         (B)  Renovations of and improvements to the
    19             Erie Zoo and Discover Asia Zoo              1,600,000
    20         (C)  Downtown commercial revitalization         1,000,000
    21         (D)  Erie Art Museum Expansion                    625,000
    22         (E)  Boston Store Rehabilitation               13,000,000  <--
    23     (ii)  County Project
    24         (A)  Improvements to Fairview Industrial
    25             Park                                        3,000,000  <--
    26             PARK                                        3,825,000  <--
    27     (III)  GREATER ERIE INDUSTRIAL DEVELOPMENT
    28         CORPORATION
    29         (A)  DEVELOPMENT OF KNOWLEDGE PARK AT I-
    30             90/STATION ROAD INTERCHANGE                 7,273,000
    19970S0188B0389                 - 73 -

     1  (8)  Fayette County
     2     (i)  City of Uniontown
     3         (A)  Fayette County Cultural Heritage
     4             Project                                     5,000,000
     5         (B)  Uniontown Parking Project                    900,000
     6     (ii)  County Projects
     7         (A)  Construction of a Coal and Coke
     8             Interpreting Center                         3,000,000
     9         (B)  Industrial Park Project                    1,700,000
    10         (C)  Infrastructure Expansion Project           6,500,000
    11         (D)  Fayette County Courthouse Renovations        500,000
    12     (iii)  Fayette County Redevelopment Authority
    13         (A)  Fayette County Cultural Heritage
    14             Project                                     4,800,000
    15         (B)  Fayette County Infrastructure
    16             Development Project                         9,000,000
    17         (C)  Fayette County Multiple Occupancy
    18             Building and Incubator Project              2,100,000
    19         (D)  Fayette County Visitor Center Project        650,000
    20         (E)  Fayette County Industrial Park
    21             Project                                     1,700,000
    22         (F)  Laurel Highlands Signage Project             500,000
    23     (iv)  Connellsville Redevelopment Authority
    24         (A)  Connellsville Redevelopment Project        1,000,000
    25  (8.1)  FULTON COUNTY                                              <--
    26         (A)  ACQUISITION AND DEVELOPMENT OF
    27             INDUSTRIAL PARK                             1,500,000
    28  (9)  Lackawanna County
    29     (i)  City of Carbondale
    30         (A)  Renovate Carbondale City Hall and
    19970S0188B0389                 - 74 -

     1             courthouse                                    500,000
     2  (10)  Lancaster County
     3     (i)  City of Manheim
     4         (A)  Rehabilitation of the Pennsylvania
     5             Baptist State Convention Center             4,440,000
     6             (Base Construction Allocation -
     7             $3,600,000)
     8             (Design and Contingencies - $840,000)
     9  (11)  Luzerne County
    10     (i)  Wyoming Valley Sanitary Authority
    11         (A)  Westwater Treatment Plant,
    12             construction of an automated hydrated
    13             lime system                                   500,000
    14         (B)  Rehabilitation and maintenance of
    15             individual member municipal sanitary
    16             sewer systems                               5,000,000
    17     (II)  CITY OF PITTSTON                                         <--
    18         (A)  RIVERFRONT DEVELOPMENT PROJECT,
    19             CONSTRUCTION OF PUBLIC BOAT LAUNCH AND
    20             DOCK FACILITIES, SCULL BOAT HOUSE AND
    21             DOCK, SMALL-SCALE MARINA AND ANCILLARY
    22             MARINA FACILITIES, PEDESTRIAN WALKWAY
    23             AND RELATED SITE IMPROVEMENTS               3,000,000
    24  (12)  Northumberland County
    25     (i)  City of Sunbury
    26         (A)  Improvements to Hunter House at Fort
    27             Augusta                                       600,000
    28  (13)  Philadelphia County
    29     (i)  City of Philadelphia
    30         (A)  Construction of Eastern Regional
    19970S0188B0389                 - 75 -

     1             Police Training Facility                    7,500,000
     2         (B)  Restoration and renovation of the
     3             Sedgwick Theater as a multipurpose
     4             cultural and arts center                    1,200,000
     5         (C)  City Recreation Department -
     6             Renovation of Lonnie Young Recreation
     7             Center                                      1,500,000
     8         (D)  Schuylkill River Development Council -
     9             For site development for Phase III of
    10             the Schuylkill River Park project           2,000,000
    11         (E)  Center for Human Advancement -
    12             Challenger Learning Center
    13             rehabilitation for the Center for Human
    14             Advancement, including the development
    15             of the Challenger Learning Center           2,200,000
    16             (Base Project Allocation - $1,800,000)
    17             (Design and Contingencies - $400,000)
    18         (F)  Intercultural Family Services -
    19             Rehabilitation of the main facility of
    20             the Intercultural Family Services
    21             Center and construction of a new health
    22             services annex                              1,350,000
    23             (Base Project Allocation - $1,100,000)
    24             (Design and Contingencies - $250,000)
    25         (G)  West Market Revitalization Project -
    26             Rehabilitation of West Market Street
    27             from 40th to 52nd Street to include
    28             retail development, economic
    29             development and public improvements         4,220,000
    30             (Base Project Allocation - $3,400,000)
    19970S0188B0389                 - 76 -

     1             (Design and Contingencies - $820,000)
     2         (H)  Shoemaker Family Center -
     3             Rehabilitation of the Shoemaker Middle
     4             School into a fully restored and
     5             technologically equipped educational
     6             complex along with a full service
     7             family support center                       2,080,000
     8             (Base Project Allocation - $1,700,000)
     9             (Design and Contingencies - $380,000)
    10         (I)  Structural renovation and installation
    11             of fiber technology at the George
    12             Institute Free Library                      1,465,000
    13             (Base Construction Allocation -
    14             $1,200,000)
    15             (Design and Contingencies - $265,000)
    16         (J)  Development and construction of a
    17             major retail complex in the West
    18             Parkside community                          5,005,000
    19             (Base Construction Allocation -
    20             $4,100,000)
    21             (Design and Contingencies - $905,000)
    22         (K)  Revitalization of the Conestoga
    23             Recreation Center in West Philadelphia      1,235,000
    24             (Base Construction Allocation -
    25             $1,000,000)
    26             (Design and Contingencies - $ 235,000)
    27         (L)  Construction of the National
    28             Constitution Center on the second block
    29             of Independence Mall between Market
    30             Street and Arch Street                     30,000,000
    19970S0188B0389                 - 77 -

     1         (M)  For facility construction and
     2             renovations to the Please Touch Museum      5,000,000
     3         (N)  Enhancements to Veterans Stadium          75,000,000
     4         (O)  Continued development for the Avenue
     5             of the Arts                                20,000,000
     6         (P)  Construction of a Primate House at the
     7             Philadelphia Zoo                            3,500,000
     8         (Q)  Neighborhood Preservation acquisition
     9             and development                             4,500,000
    10         (R)  Development Initiatives in
    11             Philadelphia County                        35,000,000
    12         (S)  Fairmount Park Commission -
    13             rehabilitation and site development for
    14             Schuylkill River                           18,000,000
    15         (T)  Fire and safety rehabilitation for the
    16             Philadelphia Art Museum                     7,000,000
    17         (U)  For the development of the Gateway
    18             Visitor Center on the Mall in
    19             Independence National Historic Park        10,000,000
    20         (V)  St. Phillip's Community Development
    21             Corporation for capital improvement and
    22             housing development in North Central
    23             Empowerment Zone                              500,000
    24         (W)  ACQUISITION AND RENOVATION OF A                       <--
    25             BUILDING ON GERMANTOWN AVENUE TO HOUSE
    26             THE GERMANTOWN SETTLEMENT HOUSE               250,000
    27         (X)  SITE DEVELOPMENT AND CONSTRUCTION OF
    28             6701 GERMANTOWN AVENUE, THE SITE OF THE
    29             WAGON WHEEL INN                               500,000
    30         (Y)  CONSTRUCTION OF REGIONAL PERFORMING
    19970S0188B0389                 - 78 -

     1             ARTS CENTER ON SOUTH BROAD STREET          20,000,000
     2         (Z)  DEMOLITION OF FORMER NAVAL HOSPITAL ON
     3             BROAD AND HARTRANFT STREETS                 3,000,000
     4         (AA)  CHESTNUT STREET INTERMODAL
     5             IMPROVEMENT PROJECT                         4,367,000
     6         (BB)  NORTH BROAD STREET AVENUE OF THE ARTS
     7             PROJECT -- GATEWAY INTERSECTION
     8             IMPROVEMENTS                                7,900,000
     9         (CC)  EAST FALLS RIDGE AVENUE
    10             REVITALIZATION PROJECT                      2,500,000
    11         (DD)  RENOVATIONS TO HADDINGTON FIRE HOUSE
    12             SENIOR SERVICES CENTER                      1,100,000
    13         (EE)  RENOVATIONS TO THE HOUSE OF UMOJA
    14             CRIME PREVENTION AND HUMAN DEVELOPMENT
    15             INSTITUTE                                   2,600,000
    16         (FF)  DEMOLITION OF PHILADELPHIA CIVIC
    17             CENTER                                     10,000,000
    18  (14)  Pike County
    19     (i)  Pike County Center for the Performing
    20         Arts                                            7,500,000
    21  (15)  Schuylkill County
    22     (i)  Borough of Tamaqua
    23         (A)  Improvements to Tamaqua Train Station        250,000
    24  (16)  Somerset County
    25         (A)  Somerset County Bicentennial
    26             Industrial Park Project                       626,000
    27  (17)  WARREN COUNTY                                               <--
    28     (I)  WARREN COUNTY DEVELOPMENT ASSOCIATION
    29         (A)  CONSTRUCTION OF AN INDUSTRIAL FACILITY
    30             IN THE EUCLID AVENUE INDUSTRIAL PARK          500,000
    19970S0188B0389                 - 79 -

     1  (17) (18)  Westmoreland County                                    <--
     2     (i)  Rostraver
     3         (A)  Acquisition and/or construction of a
     4             combination public library and senior
     5             citizen center                              2,000,000
     6  (18) (19)  York County                                            <--
     7     (i)  City of York
     8         (A)  Hoffman Stadium Reconstruction             6,000,000  <--
     9         (A)  HOFFMAN STADIUM RECONSTRUCTION            10,000,000  <--
    10         (B)  Public improvements in support of the
    11             Boundry Avenue redevelopment project        3,300,000
    12         (C)  George Street two-way conversion
    13             project                                       850,000
    14         (D)  Mural project infrastructure
    15             improvements                                1,000,000
    16         (E)  George Street gateway improvements           600,000
    17         (F)  Penn and Farquhar Park renovations           500,000
    18  Section 7.  Itemization of flood control projects.
    19     Additional capital projects in the category of flood control
    20  projects to be constructed by the Department of Environmental
    21  Protection, its successors or assigns, and to be financed by the
    22  incurring of debt are hereby itemized, together with their
    23  respective estimated costs, as follows:
    24                                                           Total
    25                                                          Project
    26             Project                                    Allocation
    27  (1)  Department of Environmental Protection          $20,456,000  <--
    28  (1)  DEPARTMENT OF ENVIRONMENTAL PROTECTION          $25,456,000  <--
    29     (i)  Allegheny County
    30         (A)  Additional funds for Turtle Creek
    19970S0188B0389                 - 80 -

     1             Flood Control Project                         383,000
     2             (Base Project Allocation - $383,000)
     3     (ii)  Bedford County
     4         (A)  Borough of Hyndman - Wills Creek
     5             Restoration Project                           373,000
     6     (iii)  Cumberland County
     7         (A)  Borough of Carlisle Chapel Hill Storm
     8             Drainage Project                            1,000,000
     9             (Base Project Allocation - $900,000)
    10             (Design and Contingencies - $100,000)
    11         (B)  Lower Allen Township - Highland Park
    12             Drainage Project                            1,240,000
    13         (C)  Hampden Township - Floodproofing
    14             Pinebrook Wastewater Treatment Plant          300,000
    15             (Base Project Allocation - $250,000)
    16             (Design and Contingencies - $50,000)
    17     (iv)  Greene County
    18         (A)  Flood mitigation project in Center
    19             Township                                      157,000
    20         (B)  Flood mitigation project in Jackson
    21             Township                                      188,000
    22         (C)  Flood mitigation project in Perry
    23             Township                                      500,000
    24         (D)  Flood mitigation project in Wayne
    25             Township                                      530,000
    26     (v)  Luzerne County
    27         (A)  Township of Plains, Mill Creek Flood
    28             Protection Project, construction of a
    29             flood protection project along Mill
    30             Creek and its unnamed tributary             1,030,000
    19970S0188B0389                 - 81 -

     1     (vi)  Montgomery County
     2         (A)  Upper Dublin Township - Construction
     3             and rehabilitation of Ardsley Drainage
     4             Channel                                     1,800,000
     5     (vii)  Schuylkill County
     6         (A)  Flood control project on Wabash Creek,
     7             Walker Township and Tamaqua Borough,
     8             involving a tunnel bypass of collapsed
     9             culvert                                    12,100,000
    10             (Base Project Allocation - $11,000,000)
    11             (Design and Contingencies - $1,100,000)
    12     (VIII)  SOMERSET COUNTY                                        <--
    13         (A)  SUMMIT TOWNSHIP, CONSTRUCTION OF A
    14             CONCRETE FLOOD WALL ON THE SUMMIT
    15             TOWNSHIP SIDE OF THE CASSELMAN RIVER
    16             ACROSS THE RIVER FROM THE BOROUGH OF
    17             MEYERSDALE                                  5,000,000
    18     (viii) (IX)  York County                                       <--
    19         (A)  Construction of flood retention
    20             basins, Dallastown Borough and York
    21             Township                                      350,000
    22         (B)  Construction of flood retention
    23             basins, Powder Mill and Tyler Run
    24             Roads                                         505,000
    25  Section 8.  Itemization of Keystone Recreation, Park and
    26                 Conservation Projects.
    27     Projects in the category of Keystone Recreation, Park and
    28  Conservation projects to be constructed by the Department of
    29  Conservation and Natural Resources, its successors or assigns,
    30  and to be financed by the incurring of debt and/or current
    19970S0188B0389                 - 82 -

     1  revenues, are hereby itemized, together with their respective
     2  estimated costs, as follows:
     3                                                           Total
     4                                                          Project
     5             Project                                    Allocation
     6  (1)  Department of Conservation and Natural
     7     Resources                                          $9,925,000  <--
     8     RESOURCES                                         $14,400,000  <--
     9     (i)  Bald Eagle State Park
    10         (A)  Renovation of the sewage treatment
    11             plant and collection system                   600,000
    12     (ii)  Forest District 12
    13         (A)  Rehabilitate 30 miles of Pine Creek
    14             Trail                                       1,250,000
    15         (B)  Rehabilitate Colton Point Road             1,200,000
    16     (iii)  Gifford Pinchot State Park
    17         (A)  Renovation of the sewage treatment
    18             plant and collection system                   800,000
    19         (B)  REHABILITATION OF COMFORT STATIONS,                   <--
    20             CHILDREN'S PLAY AREAS, PARKING AND
    21             ACCESS AREAS                                  750,000
    22             (BASE PROJECT ALLOCATION - $750,000)
    23     (iv)  Kings Gap Environmental Education Center
    24         (A)  Replacement of interior plumbing and
    25             upgrade electrical and heating systems        700,000
    26     (v)  Ryerson Station State Park
    27         (A)  Rehabilitate swimming pool                   700,000
    28     (vi)  Worlds End State Park
    29         (A)  Construct new sewage treatment plant
    30             and collection system                         500,000
    19970S0188B0389                 - 83 -

     1     (vii)  Lackawanna State Park
     2         (A)  Park improvements                            225,000
     3     (viii)  Thornhurst State Park
     4         (A)  Park improvements                            150,000
     5     (IX)  RICKETTS GLEN STATE PARK                                 <--
     6         (A)  CONSTRUCTION OF NEW PARK OFFICE AND
     7             DEMOLITION AND CLEARANCE OF EXISTING
     8             SITE                                          750,000
     9             (BASE PROJECT ALLOCATION - $750,000)
    10     (ix) (X)  Allegheny County                                     <--
    11         (A)  Dormont Borough, Beggs Snyder Park
    12             Improvements                                   50,000
    13     (x) (XI)  Bucks County                                         <--
    14         (A)  Acquisition of 167 acres designated as
    15             a working "historic airfield"               1,500,000
    16     (XII)  BUTLER COUNTY                                           <--
    17         (A)  ALAMEDA PARK, RENOVATION OF POOL             600,000
    18     (xi) (XIII)  Lackawanna County                                 <--
    19         (A)  Borough of Moosic, park and
    20             playground                                    200,000
    21         (B)  Borough of Moscow, park and
    22             playground                                    100,000
    23         (C)  Greenfield Township, park and
    24             playground                                     50,000
    25         (D)  Newton Township, baseball park at
    26             three sites                                   500,000
    27         (E)  Newton Township, park and playground          50,000
    28         (F)  South Abington Township, park and
    29             playground                                    200,000
    30     (XIV)  LEHIGH COUNTY                                           <--
    19970S0188B0389                 - 84 -

     1         (A)  CITY OF ALLENTOWN, RENOVATIONS TO
     2             BICENTENNIAL PARK                             750,000
     3     (xii) (XV)  Luzerne County                                     <--
     4         (A)  Susquehanna River Trail, conversion to                <--
     5             trail of former track of Pocono
     6             Northeast Railway line from City of
     7             Pittston to City of Wilkes-Barre              300,000
     8         (A)  SUSQUEHANNA RIVER TRAIL, CONSTRUCTION                 <--
     9             OF TRAIL ALONG A CORRIDOR OF RAILWAY
    10             OWNED BY THE LUZERNE COUNTY RAIL
    11             CORPORATION FROM BOROUGH OF DURYEA TO
    12             CITY OF WILKES-BARRE                          300,000
    13     (XVI)  YORK COUNTY
    14         (A)  HERITAGE RAIL/TRAIL, DEVELOPMENT OF
    15             TEN MILES OF TRAIL AND ASSOCIATED
    16             IMPROVEMENTS                                1,625,000
    17     (xiii) (XVII)  Presque Isle State Park                         <--
    18         (A)  Office rehabilitation and expansion          850,000
    19  Section 9.  Itemization of Pennsylvania Game Commission Capital
    20                 Projects.
    21     The individual capital projects in the category of public
    22  improvement projects to be acquired by the Pennsylvania Game
    23  Commission and to be financed from current revenues of the Game
    24  Fund pursuant to executive authorizations are hereby itemized,
    25  together with their respective estimated costs, as follows:
    26                                                           Total
    27                                                          Project
    28             Project                                    Allocation
    29  (1)  Pennsylvania Game Commission                     $5,000,000
    30     (i)  Upgrade FM radio system for all western
    19970S0188B0389                 - 85 -

     1         regions including construction of towers,
     2         shelters and antennae and the acquisition
     3         of microwave equipment, base stations,
     4         consoles and other equipment necessary to
     5         achieve a communication system fully
     6         compatible with future 800 MHz Statewide
     7         system                                          5,000,000
     8  Section 10.  Itemization of Pennsylvania Fish and Boat
     9                 Commission Capital Projects.
    10     The individual capital projects in the category of public
    11  improvement projects to be developed by the Pennsylvania Fish
    12  and Boat Commission and to be financed from current revenues of
    13  the Fish Fund and the Boat Fund pursuant to executive
    14  authorizations are hereby itemized, together with their
    15  respective estimated costs, as follows:
    16                                                           Total
    17                                                          Project
    18             Project                                    Allocation
    19  (1)  Pennsylvania Fish and Boat Commission            $6,380,000
    20     (i)  Beaver County
    21         (A)  Development of a boating access area
    22             in Monaca Borough                             200,000
    23             (Base Project Allocation - $200,000)
    24     (ii)  Crawford County
    25         (A)  Acquisition and renovation of a
    26             Northeast Law Enforcement Office and
    27             associated regional Fish and Boat
    28             Commission office facilities and
    29             installation of boat storage, parking
    30             and associated facilities in Vernon
    19970S0188B0389                 - 86 -

     1             Township                                      180,000
     2             (Base Project Allocation - $180,000)
     3     (iii)  Erie County
     4         (A)  Shades Beach Park Development              6,000,000
     5  Section 11.  Itemization of forestry bridge                       <--
     6             projects.
     7     Projects in the category of forestry bridge
     8  projects to be constructed by the Department of
     9  Conservation and Natural Resources, its successors
    10  or assigns, and to be financed by oil company
    11  franchise tax revenues pursuant to 75 Pa.C.S. §
    12  9502(a)(2)(iv) (relating to imposition of tax),
    13  are hereby itemized, together with their
    14  respective estimated costs, as follows:
    15                                                           Total    <--
    16                                                          Project   <--
    17             Project                                    Allocation
    18  (1)  Department of Conservation and Natural
    19     Resources                                         $13,514,000
    20     (i)  Adams County
    21         (A)  Replacement of Bridge No.01-0005,
    22             Carbaugh Run Bridge                           250,000
    23     (ii)  Bedford County
    24         (A)  Replacement of Bridge No.02-0002,
    25             Wertz Road Bridge over Cove Creek             100,000
    26     (iii)  Centre County
    27         (A)  Replacement of Bridge No.7-0010,
    28             Siglerville Millheim Pike Bridge              162,000
    29         (B)  Replacement of Bridge No.7-0015, Green
    30             Valley Road Bridge                            260,000
    19970S0188B0389                 - 87 -

     1         (C)  Replacement of Bridge No.7-0033, Pine
     2             Creek Road Bridge                             386,000
     3         (D)  Replacement of Bridge No.7-0045,
     4             McCall Dam Road Bridge over White Deer
     5             Creek                                         180,000
     6         (E)  Replacement of Bridge No.9-0030, Six
     7             Mile Run Bridge                               192,000
     8         (F)  Replacement of Bridge No.10-0028,
     9             State Line Road Bridge                        196,000
    10     (iv)  Clearfield County
    11         (A)  Replacement of Bridge No.9-0005, Tyler
    12             Road Bridge over Laurel Run                   284,000
    13         (B)  Replacement of Bridge No.9-0019,
    14             Dent's Branch Road Bridge                     282,000
    15         (C)  Replacement of Bridge No.9-0022,
    16             Merrill Road Bridge                           197,000
    17     (v)  Clinton County
    18         (A)  Replacement of Bridge No.10-0033,
    19             Cooks Run Road Bridge over Cooks Run          110,000
    20         (B)  Replacement of Bridge No.10-0042, Two
    21             Mile Road Bridge                              100,000
    22         (C)  Replacement of Bridge No.10-0043, Big
    23             Basin Road Bridge over Shintown Run           206,000
    24         (D)  Replacement of Bridge No.10-059,
    25             bridge over right branch of Young
    26             Woman's Creek Road                            287,000
    27         (E)  Replacement of Bridge No.10-0064,
    28             Trout Run Bridge                              255,000
    29         (F)  Replacement of Bridge No.15-0021,
    30             County Line Road Bridge                       167,000
    19970S0188B0389                 - 88 -

     1     (vi)  Cumberland County
     2         (A)  Replacement of Bridge No.01-0006,
     3             Woodrow Road Run Bridge                       150,000
     4         (B)  Replacement of Bridge No.01-0010,
     5             Milesburn Road Bridge                         102,000
     6     (vii)  Dauphin County
     7         (A)  Replacement of large culvert, White
     8             Oak Road Bridge over White Oak Run            100,000
     9     (viii)  Elk County
    10         (A)  Replacement of Bridge No.13-0040, Red
    11             Run Road Bridge                               160,000
    12         (B)  Replacement of Bridge No.13-0049,
    13             Shaffer Draft Road Bridge                     175,000
    14         (C)  Replacement of Bridge No.13-0050, West
    15             Hicks Run Road Bridge                         175,000
    16         (D)  Replacement of Bridge No.13-0052,
    17             bridge over east branch of Hicks Run          175,000
    18         (E)  Replacement of Bridge No.13-0053,
    19             bridge over east branch of Hicks Run          175,000
    20     (ix)  Franklin County
    21         (A)  Replacement of Bridge No.01-0016, Wirt
    22             Road Bridge                                   147,000
    23         (B)  Replacement of Bridge No.01-0022,
    24             Rattlesnake Run Road Bridge                   149,000
    25         (C)  Replacement of Bridge No.01-0021,
    26             Lindsay Lot Road Bridge over Furnace
    27             Run                                           100,000
    28     (x)  Huntingdon County
    29         (A)  Replacement of Bridge No.5-0012,
    30             Colerain Road Bridge                          235,000
    19970S0188B0389                 - 89 -

     1         (B)  Replacement of Bridge No.5-0014,
     2             Coopers Gap Road Bridge                       160,000
     3         (C)  Replacement of Bridge No.5-0021, Stone
     4             Creek Road Bridge                             182,000
     5         (D)  Replacement of Bridge No.5-0027,
     6             Diamond Valley Road Bridge over Globe
     7             Run                                           100,000
     8         (E)  Replacement of Bridge No.5-0028,
     9             Laurel Run Road Bridge                        213,000
    10         (F)  Replacement of Bridge No.5-0051,
    11             Coopers Gap Road Bridge                       174,000
    12     (xi)  Jefferson County
    13         (A)  Replacement of Bridge No.8-0003,
    14             Callen Run Road Bridge over Callen Run        200,000
    15     (xii)  Juniata County
    16         (A)  Replacement of Bridge No.3-0007,
    17             Spectacle Gap Bridge                          158,000
    18     (xiii)  Lycoming County
    19         (A)  Replacement of Bridge No.12-0015, Rock
    20             Run Road Bridge                               175,000
    21         (B)  Replacement of Bridge No.12-0016, Rock
    22             Run Road Bridge                               164,000
    23         (C)  Replacement of Bridge No.12-0019,
    24             Little Bear Bridge                            193,000
    25         (D)  Replacement of Bridge No.12-0020,
    26             Little Bear Bridge                            193,000
    27         (E)  Replacement of Bridge No.12-0021,
    28             Little Bear Bridge                            193,000
    29         (F)  Replacement of Bridge No.12-0022,
    30             Little Bear Creek Road Bridge                 237,000
    19970S0188B0389                 - 90 -

     1         (G)  Replacement of Bridge No.12-0028,
     2             Fourth Gap Road Bridge                        100,000
     3         (H)  Replacement of large culvert, Frances
     4             Road at Big Hollow                            100,000
     5     (xiv)  Mifflin County
     6         (A)  Replacement of Bridge No.3-0008,
     7             Spectacle Gap Road Bridge over East
     8             Licking Creek                                 150,000
     9         (B)  Replacement of Bridge No.7-0004,
    10             Havice Valley Road Bridge over Panther
    11             Run                                           257,000
    12     (xv)  Monroe County
    13         (A)  Replacement of Bridge No.19-0001,
    14             Laurel Run Road Bridge                        159,000
    15     (xvi)  Perry County
    16         (A)  Replacement of Bridge No.3-0010, Elk
    17             Hill Road Bridge                              152,000
    18         (B)  Replacement of Bridge No.3-0011, Elk
    19             Hill Road Bridge                              152,000
    20         (C)  Replacement of Bridge No.3-0014,
    21             Phoenix Bridge, road washout at north
    22             abutment                                      100,000
    23         (D)  Replacement of Bridge No.3-0015,
    24             Sheaffer Run Bridge, undermining at
    25             south abutment                                150,000
    26         (E)  Replacement of Bridge No.3-0016,
    27             Laurel Run Road Bridge                        185,000
    28         (F)  Replacement of Bridge No.3-0018, Twin
    29             Bridge                                        180,000
    30         (G)  Replacement of culvert, Shearer Dug
    19970S0188B0389                 - 91 -

     1             Box Culvert                                   100,000
     2     (xvii)  Pike County
     3         (A)  Replacement of Bridge No.19-0004, Pine
     4             Flats Run Road Bridge                         160,000
     5     (xviii)  Potter County
     6         (A)  Replacement of Bridge No.15-0013,
     7             Windfall Road Bridge                          160,000
     8         (B)  Replacement of Bridge No.15-0015,
     9             Joerg Run Road Bridge                         160,000
    10         (C)  Replacement of Bridge No.15-0018, Lebo
    11             Run Road Bridge                               160,000
    12         (D)  Replacement of Bridge No.15-0020,
    13             Robinson Road Bridge                          230,000
    14         (E)  Replacement of Bridge No.15-0024,
    15             Robinson Road Bridge                          140,000
    16         (F)  Replacement of Bridge No.16-0015,
    17             Butternut Hollow Road Bridge over
    18             Kettle Creek                                  110,000
    19     (xix)  Somerset County
    20         (A)  Replacement of Bridge No.4-0002, Blue
    21             Hole Road Bridge                              192,000
    22         (B)  Replacement of Bridge No.4-0008, Cole
    23             Run Road Bridge                               138,000
    24     (xx)  Sullivan County
    25         (A)  Replacement of Bridge No.20-0002,
    26             Brunnerdale Road Bridge                       220,000
    27         (B)  Replacement of Bridge No.20-0008,
    28             Shanerburg Road Bridge                        212,000
    29         (C)  Replacement of Bridge No.20-0011,
    30             Shanerburg Road Bridge over Shanerburg
    19970S0188B0389                 - 92 -

     1             Run                                           110,000
     2     (xxi)  Tioga County
     3         (A)  Replacement of Bridge No.16-0004, Left
     4             Asaph Road Bridge                             248,000
     5         (B)  Replacement of Bridge No.16-0005,
     6             Asaph Run Bridge                              414,000
     7         (C)  Replacement of Bridge No.16-0010,
     8             Painter Leetonia Road Bridge                  170,000
     9         (D)  Replacement of Bridge No.16-0011,
    10             Cedar Run Bridge                              170,000
    11         (E)  Replacement of Bridge No.16-0020, Mine
    12             Hole Road Bridge                              107,000
    13     (xxii)  Westmoreland County
    14         (A)  Replacement of Bridge No.4-0011, Linn
    15             Run Road Bridge over Linn Run                 125,000
    16     (xxiii)  Union County
    17         (A)  Replacement of Bridge No.7-0016,
    18             Hoofnagle Road Bridge                         235,000
    19         (B)  Replacement of Bridge No.7-0017,
    20             Weikert Run Road Bridge                       235,000
    21         (C)  Replacement of Bridge No.7-0047, White
    22             Deer Creek Road Bridge                        234,000
    23  SECTION 11.  RESTRICTION ON CERTAIN FUNDS.                        <--
    24     THE NEW AND ADDITIONAL FUNDS PROVIDED FOR DGS 948-37, THE
    25  EXPANSION OF CENTRAL AIR CONDITIONING SYSTEM TO THE MAIN CAPITOL
    26  BUILDING, DGS 948-35, THE FIRE SAFETY CODE IMPROVEMENTS TO THE
    27  CAPITOL COMPLEX SPECIFICALLY RELATING TO THE CAPITOL BUILDING,
    28  DGS 946-2, RENOVATION AND CONVERSION OF THE OLD MUSEUM BUILDING
    29  FOR LEGISLATIVE OFFICES AND THE REPAIR AND RENOVATION OF THE
    30  CAPITOL COMPLEX, ITEMIZED IN SECTION 3(7)(I)(B), (C), (D) AND
    19970S0188B0389                 - 93 -

     1  (E), SHALL ONLY BE DISBURSED UPON THE WRITTEN APPROVAL OF BOTH
     2  THE CHIEF CLERK OF THE SENATE AND THE CHIEF CLERK OF THE HOUSE
     3  OF REPRESENTATIVES. THE NEW AND ADDITIONAL FUNDS PROVIDED FOR
     4  DGS 948-35, THE FIRE SAFETY CODE IMPROVEMENTS RELATING TO THE
     5  NORTH OFFICE BUILDING SHALL ONLY BE DISBURSED UPON THE WRITTEN
     6  APPROVAL OF THE CHIEF CLERK OF THE SENATE. THE NEW AND
     7  ADDITIONAL FUNDS PROVIDED FOR DGS 948-35, THE FIRE SAFETY CODE
     8  IMPROVEMENTS RELATING TO THE SOUTH OFFICE BUILDING SHALL ONLY BE
     9  DISBURSED UPON THE WRITTEN APPROVAL OF THE CHIEF CLERK OF THE
    10  HOUSE OF REPRESENTATIVES.
    11  Section 12.  Limited waiver of local requirements.
    12     (a)  Waivers for current itemizations.--The limitation on
    13  Department of Transportation funding of capital projects under
    14  74 Pa.C.S. § 1302(4) (relating to program authorizations) shall
    15  be totally waived for the capital projects in the category of
    16  transportation assistance projects for mass transit contained in
    17  section 5(a)(9)(ii), (v), (xii) and (xiii) 5(A)(9)(III), (V),     <--
    18  (VII) AND (VIII), (10)(i), (ii), (iii), (xiii), (xiv) and (xv)
    19  and (14)(i).
    20     (b)  Waiver for 1992 itemization.--
    21         (1)  Notwithstanding any provision to the contrary, there
    22     shall be no local match funding requirement for phases I and
    23     II of the National magnetic levitation prototype proposal and
    24     development, as described in section 5(b)(15)(i)(B) of the
    25     act of December 28, 1992 (P.L.1694, No.188), known as the
    26     Capital Budget Project Itemization Act of 1991-1992.
    27         (2)  The Department of Transportation shall select a
    28     contractor for the project described in section
    29     5(b)(15)(i)(B) of the Capital Budget Project Itemization Act
    30     of 1991-1992. Such selection shall be based on the following
    19970S0188B0389                 - 94 -

     1     criteria; the contractor must have extensive knowledge of
     2     magnetic levitation technology and have been incorporated in
     3     this Commonwealth for at least six years for the express
     4     purpose of developing magnetic levitation technology. The
     5     contractor must also have demonstrated an ability to attract
     6     multimodal private sector investment, including corporate and
     7     labor support, with participation of a major U.S. passenger
     8     airline company. The contractor must also have demonstrated
     9     an ability to obtain Federal, State and local funding for
    10     magnetic levitation development.
    11  Section 13.  Use of existing funds.
    12     (a)  Public improvements.--Of the $1,373,007,000               <--
    13  $1,756,335,000 which is authorized for the acquisition or
    14  construction of public improvement projects under section 3, the
    15  sum of $25,540,000 shall be provided from excess funds available
    16  in the unallocated reserves of the Capital Facilities Fund from
    17  previous public improvement appropriations for projects for
    18  additional funding itemized in section 3.
    19     (b)  Furniture and equipment.--Of the $52,249,000 $52,677,000  <--
    20  which is authorized for the purchase of original movable
    21  furniture and equipment for the projects which are included in
    22  section 4, the sum of $115,000 shall be provided from excess
    23  funds available in the unallocated reserves of the Capital
    24  Facilities Fund from previous furniture and equipment
    25  appropriations for projects for additional funding itemized in
    26  section 4.
    27  Section 14.  Debt authorization.
    28     (a)  Public improvements.--The Governor, Auditor General and
    29  State Treasurer are hereby authorized and directed to borrow
    30  from time to time in addition to any authorization heretofore or
    19970S0188B0389                 - 95 -

     1  hereafter enacted, on the credit of the Commonwealth, subject to
     2  the limitations provided in the current capital budget, money
     3  not exceeding in the aggregate the sum of $1,347,467,000          <--
     4  $1,730,795,000 as may be found necessary to carry out the
     5  acquisition and construction of the public improvement projects
     6  specifically itemized in a capital budget.
     7     (b)  Furniture and equipment.--The Governor, Auditor General
     8  and State Treasurer are hereby authorized and directed to borrow
     9  from time to time in addition to any authorization heretofore or
    10  hereafter enacted, on the credit of the Commonwealth, subject to
    11  the limitations provided in the current capital budget, money
    12  not exceeding in the aggregate the sum of $52,134,000             <--
    13  $52,562,000 as may be found necessary to carry out the public
    14  improvement projects consisting of the acquisition of original
    15  movable furniture and equipment specifically itemized in a
    16  capital budget.
    17     (c)  Transportation assistance.--The Governor, Auditor
    18  General and State Treasurer are hereby authorized and directed
    19  to borrow from time to time in addition to any authorization
    20  heretofore or hereafter enacted, on the credit of the
    21  Commonwealth, subject to the limitations provided in the current
    22  capital budget, money not exceeding in the aggregate the sum of
    23  $542,968,000 $534,271,000 as may be found necessary to carry out  <--
    24  the acquisition and construction of the transportation
    25  assistance projects specifically itemized in a capital budget.
    26     (d)  Redevelopment assistance.--Subject to the limitation in
    27  section 1616.1-B(b) of the act of April 9, 1929 (P.L.343,
    28  No.176), known as The Fiscal Code, the Governor, Auditor General
    29  and State Treasurer are hereby authorized and directed to borrow
    30  from time to time in addition to any authorization heretofore or
    19970S0188B0389                 - 96 -

     1  hereafter enacted, on the credit of the Commonwealth, subject to
     2  the limitations provided in the current capital budget, money
     3  not exceeding in the aggregate the sum of $921,068,000            <--
     4  $1,012,098,000 as may be found necessary to carry out the
     5  redevelopment assistance and the redevelopment capital
     6  assistance projects specifically itemized in a capital budget.
     7     (e)  Flood control.--The Governor, Auditor General and State
     8  Treasurer are hereby authorized and directed to borrow from time
     9  to time in addition to any authorization heretofore or hereafter
    10  enacted, on the credit of the Commonwealth, subject to the
    11  limitations provided in the current capital budget, money not
    12  exceeding in the aggregate the sum of $20,456,000 $25,456,000 as  <--
    13  may be found necessary to carry out the acquisition and
    14  construction of the flood control projects specifically itemized
    15  in a capital budget.
    16  Section 15.  Issue of bonds.
    17     The indebtedness authorized in this act shall be incurred,
    18  from time to time, and shall be evidenced by one or more series
    19  of general obligation bonds of the Commonwealth in such
    20  aggregate principal amount for each series as the Governor, the
    21  Auditor General and the State Treasurer shall determine, but the
    22  latest stated maturity date shall not exceed the estimated
    23  useful life of the projects being financed as stated in section
    24  16.
    25  Section 16.  Estimated useful life and term of debt.
    26     (a)  Estimated useful life.--The General Assembly states that
    27  the estimated useful life of the public improvement projects
    28  itemized in this act is as follows:
    29         (1)  Public improvement projects, 30 years.
    30         (2)  Furniture and equipment projects, 10 years.
    19970S0188B0389                 - 97 -

     1         (3)  Transportation assistance projects:
     2             (i)  Rolling stock, 15 years.
     3             (ii)  Passenger buses, 12 years.
     4             (iii)  Furniture and equipment, 10 years.
     5             (iv)  All others, 30 years.
     6     (b)  Term of debt.--The maximum term of the debt authorized
     7  to be incurred under this act is 30 years.
     8  Section 17.  Appropriations.
     9     (a)  Public improvements.--The net proceeds of the sale of
    10  the obligations authorized in this act are hereby appropriated
    11  from the Capital Facilities Fund to the Department of General
    12  Services in the maximum amount of $1,347,467,000 $1,730,795,000   <--
    13  to be used by it exclusively to defray the financial cost of the
    14  public improvement projects specifically itemized in a capital
    15  budget. After reserving or paying the expenses of the sale of
    16  the obligation, the State Treasurer shall pay to the Department
    17  of General Services the moneys as required and certified by it
    18  to be legally due and payable.
    19     (b)  Furniture and equipment.--The net proceeds of the sale
    20  of the obligations authorized in this act are hereby
    21  appropriated from the Capital Facilities Fund to the Department
    22  of General Services in the maximum amount of $52,134,000          <--
    23  $52,562,000 to be used by it exclusively to defray the financial
    24  cost of the public improvement projects consisting of the
    25  acquisition of original movable furniture and equipment
    26  specifically itemized in a capital budget. After reserving or
    27  paying the expenses of the sale of the obligation, the State
    28  Treasurer shall pay to the Department of General Services the
    29  moneys as required and certified by it to be legally due and
    30  payable.
    19970S0188B0389                 - 98 -

     1     (c)  Transportation assistance.--The net proceeds of the sale
     2  of the obligations authorized in this act are hereby
     3  appropriated from the Capital Facilities Fund to the Department
     4  of Transportation in the maximum amount of $542,968,000           <--
     5  $534,271,000 to be used by it exclusively to defray the
     6  financial cost of the transportation assistance projects
     7  specifically itemized in a capital budget. After reserving or
     8  paying the expense of the sale of the obligation, the State
     9  Treasurer shall pay to the Department of Transportation the
    10  moneys as required and certified by it to be legally due and
    11  payable.
    12     (d)  Redevelopment assistance.--The net proceeds of the sale
    13  of the obligations authorized in this act are hereby
    14  appropriated from the Capital Facilities Fund to the Department
    15  of Community and Economic Development in the maximum amount of
    16  $921,068,000 $1,012,098,000 to be used by it exclusively to       <--
    17  defray the financial cost of the redevelopment assistance and
    18  redevelopment capital assistance projects specifically itemized
    19  in a capital budget. After reserving or paying the expenses of
    20  the sale of the obligation, the State Treasurer shall pay to the
    21  Department of Community and Economic Development the moneys as
    22  required and certified by it to be legally due and payable.
    23     (e)  Flood control.--The net proceeds of the sale of the
    24  obligations authorized in this act are hereby appropriated from
    25  the Capital Facilities Fund to the Department of Environmental
    26  Protection in the maximum amount of $20,456,000 $25,456,000 to    <--
    27  be used by it exclusively to defray the financial cost of the
    28  flood control projects specifically itemized in a capital
    29  budget. After reserving or paying the expense of the sale of the
    30  obligation, the State Treasurer shall pay to the Department of
    19970S0188B0389                 - 99 -

     1  Environmental Protection the moneys as required and certified by
     2  it to be legally due and payable.
     3  Section 18.  Federal funds.
     4     In addition to those funds appropriated in section 17, all
     5  moneys received from the Federal Government for the projects
     6  specifically itemized in this act are also hereby appropriated
     7  for those projects.
     8  Section 19.  Prioritization of public improvement projects.
     9     The public improvement projects authorized in this act shall
    10  be prioritized by the Department of General Services in such
    11  manner as to ensure that at least 25% of the total financial
    12  cost of public improvement projects approved for design and/or
    13  construction in any one fiscal year shall be for new
    14  construction projects and at least 25% of the total financial
    15  cost of public improvement projects approved for design and/or
    16  construction in any one fiscal year shall be for the major
    17  renovation and retrofit of existing facilities.
    18  Section 20.  Expiration of authorization and appropriation.
    19     The authorization and appropriation for the additional
    20  capital projects itemized in sections 3, 4, 5, 6 and 7, 7, 8, 9   <--
    21  AND 10 for which construction contracts have not been executed
    22  within four years of the effective date of this act shall expire
    23  upon such date and shall be considered repealed. The Secretary
    24  of the Budget may extend an expired project for up to one year
    25  upon written notification of the majority chairman and minority
    26  chairman of the Appropriations Committee of the Senate and the
    27  majority chairman and minority chairman of the Appropriations
    28  Committee of the House of Representatives. Upon expiration of
    29  the extension period, an extended project may not be
    30  subsequently extended.
    19970S0188B0389                 - 100 -

     1  Section 21.  Special contract provisions.
     2     (a)  Abatement of hazardous materials.--Notwithstanding any    <--
     3  provisions of law to the contrary, the Department of General
     4  Services may through a request for proposals award a contract
     5  for the design and administration of the abatement of hazardous
     6  materials from the Transportation and Safety Building, as
     7  itemized in section 3. The contract may be awarded on the basis
     8  of the best interest of the Commonwealth to a responsive and
     9  responsible proposer. Although cost shall be considered as a
    10  factor, it need not be the determining factor.
    11     (b)  Demolition design and administration.--Notwithstanding
    12  any provisions of law to the contrary, the Department of General
    13  Services may through a request for proposals award a contract
    14  for the design and administration of the demolition of the
    15  Transportation and Safety Building, as itemized in section 3.
    16  The contract may be awarded on the basis of the best interest of
    17  the Commonwealth to a responsive and responsible proposer.
    18  Although cost shall be considered a factor, it need not be the
    19  determining factor.
    20     (c)  Construction management services.--The Department of
    21  General Services may, to facilitate project management, conflict
    22  resolution and timely project completion, contract for
    23  construction management services for the abatement of hazardous
    24  materials, demolition and reconstruction of the Transportation
    25  and Safety Building, as itemized in section 3.
    26     (d)  Construction management.--Notwithstanding any provisions
    27  of law to the contrary, the Department of General Services may,
    28  to facilitate project management, conflict resolution and timely
    29  project completion contract for construction management services
    30  for the construction of a 500-cell maximum security juvenile
    19970S0188B0389                 - 101 -

     1  detention facility to be located in Western Pennsylvania, to be
     2  known as the State Correction Facility at Indiana for Juvenile
     3  Offenders, and for the construction of the 1,000-cell medium      <--
     4  security facility in Forest County, AND FOR THE CONSTRUCTION OF   <--
     5  A 1,236-CELL CLOSE-SECURITY FACILITY IN WESTERN PENNSYLVANIA.
     6  Section 22.  Coordination.
     7     The program provided for in section 3(15)(iv)(A) 3(14)(IV)(A)  <--
     8  and (B) shall be developed in conjunction with the project
     9  referenced in section 5(b)(15)(i)(B) of the act of December 28,
    10  1992 (P.L.1694, No.188), known as the Capital Budget Project
    11  Itemization Act of 1991-1992, subject to the conditions set
    12  forth in the act of July 2, 1993 (P.L.134, No.31), known as the
    13  Capital Budget Act of 1993-1994.
    14  Section 23.  Repeals.
    15     The following acts and parts of acts are repealed:
    16     Section 3(1)(i)(A) and (12)(ii)(A) of the act of July 10,
    17  1986 (P.L.1285, No.118), known as the Capital Budget Project
    18  Itemization Act for 1984-1985.
    19     Section 3(3)(v)(A)(vi) of the act of October 21, 1988
    20  (P.L.851, No.113), known as the Capital Budget Project
    21  Itemization Act for 1987-1988.
    22     Sections 3(4)(ii)(A)(II) and 6(1)(iii)(A) of the act of
    23  December 28, 1992 (P.L.1694, No.188), known as the Capital
    24  Budget Project Itemization Act of 1991-1992.
    25     Sections 3(4)(i)(A) and (ii)(E) and (6)(v)(A) and 7(1)(ii)(A)
    26  and (iv)(A) of the act of July 8, 1994 (P.L.444, No.74), known
    27  as the Capital Budget Project Itemization Act for 1994-1995.
    28     Sections 3(7)(vi)(a) and 5(19)(i)(A) of the act of July 2,
    29  1993 (P.L.265, No.47), known as the Capital Budget Project
    30  Itemization Act for 1993-1994.
    19970S0188B0389                 - 102 -

     1     SECTION 6(3)(II)(A) OF THE ACT OF JULY 8, 1994 (P.L.444,       <--
     2  NO.74), KNOWN AS THE CAPITAL BUDGET PROJECT ITEMIZATION ACT FOR
     3  1994-1995.
     4     Section 68(k)(1) of the act of December 12, 1994 (P.L.962,
     5  No.136), known as the First Supplemental Capital Budget Project
     6  Itemization Act of 1994-1995.
     7     Sections 3(1)(v)(A) and (1)(x)(A) of the act of July 6, 1995   <--
     8  (1st Sp.Sess., P.L.1051, No.19), known as the 1995 Special
     9  Session Corrections and Secure Facilities Capital Budget Project
    10  Itemization Act.
    11  Section 24.  Editorial changes.
    12     In editing and preparing this act for printing following the
    13  final enactment, the Legislative Reference Bureau shall insert
    14  or revise letters or numbers for projects where the letters or
    15  numbers are missing or require revision. The bureau shall also
    16  revise the total monetary amounts for the total authorization,
    17  debt authorization, appropriations and departmental totals as
    18  necessary to agree with the total monetary amounts of the
    19  projects.
    20  Section 25.  Effective date.
    21     This act shall take effect immediately.