     1  To the act of July 11, 1996 (P.L.595, No.101), entitled "An act
     2     providing for the capital budget for the fiscal year 1996-
     3     1997," itemizing public improvement projects, furniture and
     4     equipment projects, transportation assistance projects,
     5     redevelopment assistance and redevelopment assistance capital
     6     projects, flood control projects, Keystone Recreation, Park
     7     and Conservation projects and forestry bridge projects to be
     8     constructed or acquired or assisted by the Department of
     9     General Services, the Department of Conservation and Natural
    10     Resources, the Department of Environmental Protection, the
    11     Department of Community and Economic Development, the
    12     Department of Transportation, the Pennsylvania Fish and Boat
    13     Commission or the Pennsylvania Game Commission, together with
    14     their estimated financial costs; authorizing the incurring of
    15     debt without the approval of the electors for the purpose of
    16     financing the projects to be constructed or acquired or
    17     assisted by the Department of General Services, the
    18     Department of Conservation and Natural Resources, the
    19     Department of Environmental Protection, the Department of
    20     Community and Economic Development or the Department of
    21     Transportation; stating the estimated useful life of the
    22     projects; authorizing certain waivers; making appropriations;
    23     and making repeals.

    24     The General Assembly of the Commonwealth of Pennsylvania
    25  hereby enacts as follows:
    26  Section 1.  Short title.
    27     This act shall be known and may be cited as the Capital
    28  Budget Project Itemization Act for 1996-1997.

     1  Section 2.  Total authorizations.
     2     (a)  Public improvements.--The total authorization for the
     3  additional capital projects in the category of public
     4  improvement projects itemized in section 3 and to be acquired or
     5  constructed by the Department of General Services, its
     6  successors or assigns, and to be financed by the incurring of
     7  debt, shall be $1,373,007,000.
     8     (b)  Furniture and equipment.--The total authorization for
     9  the additional capital projects in the category of public
    10  improvement projects consisting of the acquisition of original
    11  movable furniture and equipment to complete public improvement
    12  projects itemized in section 4 and to be acquired by the
    13  Department of General Services, its successors or assigns, and
    14  to be financed by the incurring of debt, shall be $52,249,000.
    15     (c)  Transportation assistance.--The total authorization for
    16  the capital projects in the category of transportation
    17  assistance projects itemized in section 5 with respect to which
    18  an interest is to be acquired in or constructed by the
    19  Department of Transportation, its successors or assigns, and to
    20  be financed by the incurring of debt, shall be $542,968,000.
    21     (d)  Redevelopment assistance.--The total authorization for
    22  the additional capital projects in the category of redevelopment
    23  assistance and redevelopment assistance capital projects
    24  itemized in section 6 for capital grants by the Department of
    25  Community and Economic Development, its successors or assigns,
    26  and to be financed by the incurring of debt, shall be
    27  $921,068,000.
    28     (e)  Flood control.--The total authorization for the capital
    29  projects in the category of flood control projects itemized in
    30  section 7 and to be constructed by the Department of
    19970S0188B0182                  - 2 -

     1  Environmental Protection, its successors or assigns, and to be
     2  financed by the incurring of debt, shall be $20,456,000.
     3     (f)  Keystone Recreation, Park and Conservation.--The total
     4  authorization for the capital projects in the category of
     5  Keystone Recreation, Park and Conservation projects itemized in
     6  section 8 and to be constructed by the Department of
     7  Conservation and Natural Resources, its successors or assigns,
     8  and to be financed from revenues in the Keystone Recreation,
     9  Park and Conservation Fund shall be $9,925,000.
    10     (g)  Game Fund projects.--The total authorization for the
    11  capital projects in the category of public improvement projects
    12  itemized in section 9 to be acquired by the Pennsylvania Game
    13  Commission and to be financed from current revenues of the Game
    14  Fund pursuant to executive authorizations shall be $5,000,000.
    15     (h)  Fish and Boat Fund projects.--The total authorization
    16  for the capital projects in the category of public improvement
    17  projects itemized in section 10 to be acquired or developed by
    18  the Pennsylvania Fish and Boat Commission and to be financed
    19  from current revenues of the Boat Fund and the Fish Fund
    20  pursuant to executive authorization shall be $6,380,000.
    21     (i)  Forestry bridge projects.--The total authorization for
    22  the forestry bridge capital projects itemized in section 11 and
    23  to be constructed by the Department of Conservation and Natural
    24  Resources, its successors or assigns and to be financed from
    25  current revenues of the Motor License Fund shall be $13,514,000.
    26  Section 3.  Itemization of public improvement projects.
    27     Additional capital projects in the category of public
    28  improvement projects to be constructed or acquired by the
    29  Department of General Services, its successors or assigns, and
    30  to be financed by the incurring of debt, are hereby itemized,
    19970S0188B0182                  - 3 -

     1  together with their respective estimated financial costs, as
     2  follows:
     3                                                           Total
     4                                                          Project
     5             Project                                    Allocation
     6  (1)  Department of Agriculture                        $1,177,000
     7     (i)  Department of Agriculture Headquarters
     8         (A)  Construction of a headhouse and
     9             greenhouse addition including a covered
    10             walkway to connect all structures             392,000
    11             (Base Project Allocation - $327,000)
    12             (Design and Contingencies - $65,000)
    13     (ii)  Farm Show Complex
    14         (A)  Removal of piping and ducting which
    15             contain asbestos materials and/or
    16             encapsulation of asbestos containing
    17             materials in Large Arena                      785,000
    18             (Base Project Allocation - $654,000)
    19             (Design and Contingencies - $131,000)
    20  (2)  Department of Community and Economic
    21     Development                                      $148,000,000
    22     (i)  Port of Philadelphia
    23         (A)  Construction of a cruise ship
    24             facility                                    2,000,000
    25     (ii)  David L. Lawrence Convention Center
    26         (A)  Expansion of convention center           145,000,000
    27     (iii)  Pittsburgh's north shore
    28         (A)  Construction of a passenger pier
    29             terminal                                    1,000,000
    30  (3)  Department of Conservation and Natural
    19970S0188B0182                  - 4 -

     1     Resources                                         $20,847,000
     2     (i)  Nescopeck State Park
     3         (A)  Park development, construction of
     4             comfort stations, pavilions, warning
     5             huts, roadways, parking lots and
     6             utilities in the main, middle and lower
     7             day use areas                               2,000,000
     8         (B)  Development of cabin area,
     9             construction of ten rustic cabins,
    10             including roads, utilities and site
    11             development                                 1,500,000
    12         (C)  Development of overnight camping area,
    13             construction of campground to include
    14             site development, bath houses, living
    15             areas, roads, overflow parking and
    16             utilities                                   1,500,000
    17     (ii)  Presque Isle State Park
    18         (A)  Waterworks reservoir area - Phase II         950,000
    19         (B)  Rehabilitation of park roadways            1,760,000
    20         (C)  Rehabilitation of water mains serving
    21             park                                        2,610,000
    22         (D)  State share of the cost of
    23             replenishing the sand on the lake side
    24             shore                                         650,000
    25             (Base Project Allocation - $650,000)
    26         (E)  Beach nourishment and breakwater
    27             maintenance                                 5,800,000
    28         (F)  Rehabilitation of comfort facilities
    29             and sewage system                           1,800,000
    30         (G)  Rehabilitation of Presque Isle Marina        962,000
    19970S0188B0182                  - 5 -

     1     (iii)  Shawnee State Park
     2         (A)  Additional funds for DGS 155-11,
     3             replacement of two bridges on main park
     4             road                                          900,000
     5     (iv)  Tyler State Park
     6         (A)  Rehabilitation of Schofield/Ford
     7             Covered Bridge                                250,000
     8     (v)  Borough of Ashley
     9         (A)  Chester area of Solomon's Creek and
    10             Bobby Strish Park Association,
    11             enhancement to the trout fishing and
    12             picnic areas along Solomon's Creek,
    13             rehabilitation and/or construction of a
    14             baseball and softball field, concession
    15             stands, restroom facilities and parking
    16             lot                                           165,000
    17  (4)  Department of Corrections                       $80,544,000
    18     (i)  State Correctional Institution - Coal
    19         Township, Northumberland County
    20         (A)  Addition of three modular units for
    21             inmate housing                             27,600,000
    22             (Base Project Allocation - $23,000,000)
    23             (Design and Contingencies - $4,600,000)
    24     (ii)  State Correctional Institution - Dallas
    25         (A)  Reconstruction of three boilers,
    26             installation of new controls,
    27             reconstruction of support structures
    28             and associated fuel handling equipment      5,640,000
    29             (Base Project Allocation - $4,700,000)
    30             (Design and Contingencies - $940,000)
    19970S0188B0182                  - 6 -

     1     (iii)  State Correctional Institution -
     2         Graterford
     3         (A)  Construction of a Level 2 housing
     4             unit, including dormitories, 50 double
     5             rooms, offices, sanitary facilities,
     6             multi-purpose room, laundry and storage
     7             areas                                       5,340,000
     8             (Base Project Allocation - $4,450,000)
     9             (Design and Contingencies - $890,000)
    10     (iv)  State Correctional Institution -
    11         Greensburg
    12         (A)  Upgrade electric utility system            2,400,000
    13             (Base Project Allocation - $2,000,000)
    14             (Design and Contingencies - $400,000)
    15     (v)  State Correctional Institution - Mercer
    16         (A)  Expansion of kitchen/dining,
    17             administration and program facilities
    18             along with utilities including water,
    19             sewer and electric                          6,000,000
    20             (Base Project Allocation - $5,000,000)
    21             (Design and Contingencies - $1,000,000)
    22         (B)  Construction of a Level 2 housing
    23             unit, including dormitories, 50 double
    24             rooms, offices, sanitary facilities,
    25             multi-purpose room, laundry and storage
    26             areas                                       5,340,000
    27             (Base Project Allocation - $4,450,000)
    28             (Design and Contingencies - $890,000)
    29     (vi)  State Correctional Institution -
    30         Pittsburgh
    19970S0188B0182                  - 7 -

     1         (A)  Rehabilitation of boiler plant
     2             components including combustion control
     3             system, stokers on boilers 4 and 5,
     4             emergency generator, ash removal system
     5             and building components                     3,120,000
     6             (Base Project Allocation - $2,600,000)
     7             (Design and Contingencies - $520,000)
     8     (vii)  State Correctional Institution -
     9         Rockview
    10         (A)  Construction of a Level 2 housing
    11             unit, including dormitories, 50 double
    12             rooms, offices, sanitary facilities,
    13             multi-purpose room, and laundry and
    14             storage areas. Also renovations to the
    15             kitchen and dining rooms and
    16             improvements to the perimeter security
    17             and intrusion detection system              8,994,000
    18             (Base Project Allocation - $7,495,000)
    19             (Design and Contingencies - $1,499,000)
    20     (viii)  State Correctional Institution -
    21         Western Pennsylvania
    22         (A)  Additional funds for DGS 575-3, to
    23             provide for expansion to 750 beds          16,110,000
    24             (Base Project Allocation - $13,425,000)
    25             (Design and Contingencies - $2,685,000)
    26  (5)  Department of Education                        $383,648,000
    27     (i)  The Pennsylvania State University
    28         (A)  University Park Campus
    29             (I)  Classroom building - Phase II         12,100,000
    30             (II)  Renovation of Willard Building       10,300,000
    19970S0188B0182                  - 8 -

     1             (III)  Renovation of Moore and Sparks
     2                 Buildings                              16,070,000
     3             (IV)  Library Depository Facility          11,000,000
     4             (V)  Renovation of Engineering Units
     5                 and Sackett Building                    8,600,000
     6             (VI)  Renovation of Chandlee
     7                 Laboratory                             10,200,000
     8             (VII)  Renovation of Whitmore and Davey
     9                 Laboratories                           10,200,000
    10         (B)  Altoona Campus
    11             (I)  Construct Multi-Story Classroom
    12                 Facility                                7,000,000
    13         (C)  Capital Campus
    14             (I)  Construct academic activities
    15                 building                                3,750,000
    16         (D)  DuBois Campus
    17             (I)  Addition to and renovation of
    18                 Smeal Building                          1,700,000
    19         (E)  Great Valley Center
    20             (I)  Addition to building                   8,000,000
    21         (F)  Mont Alto
    22             (I)  Renovation of General Studies
    23                 Building                                3,200,000
    24         (G)  York Campus
    25             (I)  Construct library addition and
    26                 classroom building addition            11,900,000
    27         (H)  The Behrend College
    28             (I)  Construction of a research and
    29                 development center                     30,000,000
    30             (II)  Renovation of Otto Behrend
    19970S0188B0182                  - 9 -

     1                 Building                                3,100,000
     2             (III)  Restoration of Erie Hall             1,800,000
     3             (IV)  Maintenance of Police and Safety
     4                 Building                                1,800,000
     5     (ii)  University of Pittsburgh
     6         (A)  Oakland Campus
     7             (I)  Upgrade and deferred maintenance
     8                 for buildings and building systems
     9                 Phase I                                12,000,000
    10             (II)  Upgrade and deferred maintenance
    11                 for buildings and building systems
    12                 Phase II                               12,000,000
    13             (III)  Additional funds for DGS 1103-
    14                 48, Convocation/Events Center          25,000,000
    15             (IV)  Renovation of Trees Hall and
    16                 Fitzgerald Field House Phase I         11,300,000
    17             (V)  Renovation of the Cathedral of
    18                 Learning                               20,000,000
    19             (VI)  Additional Funds for Hillman
    20                 Library Renovation Phase II             9,600,000
    21             (VII)  Acquisition of Bellefield Tower
    22                 for WPIC Children and Family
    23                 Programming                             8,000,000
    24             (VIII)  Construction of Basic Sciences
    25                 Complex                                25,000,000
    26         (B)  Bradford Campus
    27             (I)  Communications, Art and Technology
    28                 Building                               15,800,000
    29         (C)  Johnstown Campus
    30             (I)  Additional funds for DGS 1103-53,
    19970S0188B0182                 - 10 -

     1                 classroom/administration building         532,000
     2             (II)  Additional funds for Library
     3                 renovations                             1,580,000
     4     (iii)  Temple University
     5         (A)  Main Campus
     6             (I)  Installation of an Electronic
     7                 access/intrusion detection system
     8                 at main campus                          8,411,000
     9             (Base Project Allocation - $7,009,000)
    10             (Design and Contingencies - $1,402,000)
    11             (II)  Rehabilitation of lecture halls       4,900,000
    12             (III)  Roofing replacement                  4,410,000
    13             (IV)  Tomlinson Theater rehabilitation
    14                 and addition                            5,049,000
    15             (V)  Mitten Hall renovation for
    16                 performance hall                        8,820,000
    17             (VI)  Rehabilitation of building system
    18                 components:  Curtis, Barton, Eeury,
    19                 Biolife Sciences                       15,000,000
    20             (VII)  College Hall Renovations - Phase
    21                 II                                        850,000
    22         (B)  Ambler Campus
    23             (I)  Education/learning technology
    24                 center                                  7,200,000
    25         (C)  Various Campuses
    26             (I)  Masonry, sidewalk and walkway
    27                 repairs                                 7,812,000
    28             (II)  Telecommunications infrastructure
    29                 improvements                            8,100,000
    30             (III)  Deferred maintenance and energy
    19970S0188B0182                 - 11 -

     1                 conservation                            4,474,000
     2             (IV)  Computing and data
     3                 communications                          6,907,000
     4         (D)  All Campuses
     5             (I)  Fluorescent lighting retrofit          3,749,000
     6     (iv)  Lincoln University
     7         (A)  Construction of storm water drainage
     8             system including piping and a detention
     9             basin to prevent hydraulic overload of
    10             the sewer system                            1,084,000
    11             (Base Project Allocation - $903,000)
    12             (Design and Contingencies - $181,000)
    13     (v)  Thaddeus Stevens State School of
    14         Technology
    15         (A)  Construction of a multi-purpose
    16             activities center and rehabilitation
    17             and renovation of the existing
    18             gymnasium for a trade-technical
    19             laboratory                                  5,000,000
    20         (B)  Repair and rebuild underground utility
    21             tunnel system and repair masonry
    22             retaining wall adjacent to Stevens
    23             Avenue                                        350,000
    24  (6)  Department of Environmental Protection          $26,917,000
    25     (i)  Allegheny County
    26         (A)  Greenwald Road Flood Control Project
    27             DGS 184-20                                  2,000,000
    28         (B)  Additional funds for DGS 184-20,
    29             culverts and debris basin along
    30             tributary to Grassers Run, Bethel Park      1,080,000
    19970S0188B0182                 - 12 -

     1             (Base Project Allocation - $900,000)
     2             (Design and Contingencies - $180,000
     3         (C)  Additional funds for DGS 184-18,
     4             construction of levee, floodplain
     5             excavation and concrete retaining wall
     6             along Pine Creek, Shaler Township             360,000
     7             (Base Project Allocation - $300,000)
     8             (Design and Contingencies - $60,000)
     9     (ii)  Armstrong County
    10         (A)  Reconstruction of valves and seals at
    11             the Ernest deep mine complex, Rayne
    12             Township                                      654,000
    13             (Base Project Allocation - $545,000)
    14             (Design and Contingencies - $109,000)
    15     (iii)  Bedford County
    16         (A)  Borough of Hyndman, flood protection
    17             project                                     3,000,000
    18             (Base Project Allocation - $2,500,000)
    19             (Design and Contingencies - $500,000)
    20     (iv)  Berks County
    21         (A)  Replacement of the Felix Dam
    22             Construction of a new reinforced
    23             concrete dam                                3,900,000
    24             (Base Construction Allocation -
    25             $3,300,000)
    26             (Design and Contingencies - $600,000)
    27     (v)  Bucks County
    28         (A)  Flood control and storm water
    29             management, Phase I affecting Bristol
    30             Borough and Bristol, Falls and
    19970S0188B0182                 - 13 -

     1             Middletown Townships                          350,000
     2     (vi)  Fayette County
     3         (A)  Additional funds for DGS 180-23,
     4             construction of retaining walls and
     5             culverts and excavation to widen or
     6             deepen Dunbar Creek and Gist Run
     7             channel in Dunbar                             396,000
     8             (Base Project Allocation - $330,000)
     9             (Design and Contingencies - $66,000)
    10     (vii)  Lebanon County
    11         (A)  Additional funds for Project DGS 182-
    12             12 located on Hazel Dyke Flood Control
    13             Project                                       480,000
    14             (Base Project Allocation - $400,000)
    15             (Design and Contingencies - $80,000)
    16     (viii)  Montgomery County
    17         (A)  Additional funds for DGS 181-7,
    18             Plymouth Creek improvement, Borough of
    19             Conshohocken                                  240,000
    20             (Base Project Allocation - $200,000)
    21             (Design and Contingencies - $40,000)
    22     (ix)  Northumberland County
    23         (A)  Bank stabilization and reconstruction
    24             for Sunbury Flood Project                   1,440,000
    25             (Base Project Allocation - $1,200,000)
    26             (Design and Contingencies - $240,000)
    27     (x)  Tioga County
    28         (A)  Knoxville Borough, design and
    29             construction of dike and levy               5,100,000
    30     (xi)  York County
    19970S0188B0182                 - 14 -

     1         (A)  City of York, Spring Garden Township
     2             and York Township, Tyler Run Flood
     3             Control Project                             2,500,000
     4         (B)  Spring Garden Township, Springettsbury
     5             Township and York Township, Mill Creek
     6             Flood Control Project                       5,000,000
     7         (C)  Fairview Township, Flood Mitigation
     8             Project, relating to Meadowbrook Pump
     9             Station                                        50,000
    10         (D)  Franklintown Borough, flood control
    11             project relating to storm water
    12             management                                    367,000
    13  (7)  Department of General Services                  $43,113,000
    14     (i)  Capitol Complex
    15         (A)  Upgrade chillers and humidification
    16             systems at the State Museum and
    17             Archives Buildings                            720,000
    18             (Base Project Allocation - $600,000)
    19             (Design and Contingencies - $120,000)
    20         (B)  Additional funds for DGS 948-37,
    21             expansion of central air conditioning
    22             system to Main Capitol                     12,000,000
    23             (Base Project Allocation - $10,000,000)
    24             (Design and Contingencies - $2,000,000)
    25         (C)  Additional funds for DGS 948-9,
    26             renovation of the Finance Building          5,203,000
    27             (Base Project Allocation - $4,336,000)
    28             (Design and Contingencies - $867,000)
    29         (D)  Acoustical improvements at The Forum       3,000,000
    30             (Base Project Allocation - $2,600,000)
    19970S0188B0182                 - 15 -

     1             (Design and Contingencies - $400,000)
     2         (E)  Restoration of ceiling and wall murals
     3             at The Forum                                1,490,000
     4         (F)  Upgrade fire alarm and security
     5             systems in the State Museum and
     6             Archives Buildings                            600,000
     7         (G)  Upgrade and installation of new fire
     8             suppression system in the State Museum
     9             and Archives Buildings                      1,500,000
    10         (H)  Upgrade electrical distribution system
    11             in the State Museum and Archives
    12             Buildings                                   3,800,000
    13         (I)  Repair compression joints and
    14             stabilize exterior cladding on Museum
    15             Building                                      800,000
    16         (J)  Upgrade HVAC systems including
    17             installation of humidification and
    18             filtration equipment in the State
    19             Museum and Archives Buildings               4,000,000
    20         (K)  Roof replacement State Museum
    21             Building                                    1,200,000
    22         (L)  Asbestos abatement in the State Museum
    23             and Archives Buildings                        800,000
    24         (M)  Upgrade elevator and escalator systems
    25             in the State Museum Building                1,000,000
    26     (ii)  Warner Theater, Erie County
    27         (A)  Conversion of the theater into a
    28             performing arts center including
    29             additions to the stage area,
    30             improvements to mechanical systems and
    19970S0188B0182                 - 16 -

     1             installation of elevators                   7,000,000
     2             (Base Project Allocation - $5,833,000)
     3             (Design and Contingencies - $1,167,000)
     4  (8)  Historical and Museum Commission                   $750,000
     5     (i)  Niagara Maritime Museum
     6         (A)  Construction of fixed exhibits               750,000
     7             (Base Project Allocation - $625,000)
     8             (Design and Contingencies - $125,000)
     9  (9)  Department of Labor and Industry                 $7,000,000
    10     (i)  Hiram G. Andrews Center
    11         (A)  Upgrade and repair of facility             7,000,000
    12  (10)  Department of Military Affairs                 $23,165,000
    13     (i)  Cambria County Armory at Johnstown
    14         (A)  Renovation and addition                    1,380,000
    15             (Base Project Allocation - $1,150,000)
    16             (Design and Contingencies - $230,000)
    17     (ii)  Franklin County Veterans Care Facility
    18         (A)  South Mountain Restoration Center         12,000,000
    19             (Base Project Allocation - $10,400,000)
    20             (Design and Contingencies - $1,600,000)
    21     (iii)  Holidaysburg Veterans Home
    22         (A)  Improvements to facility roadways and
    23             parking lots                                1,000,000
    24     (iv)  Southeastern Veterans Home
    25         (A)  Expansion of parking facility                285,000
    26     (v)  Scotland School
    27         (A)  Additional funds for project DGS 415-
    28             29, reconstruction of the main dining
    29             hall                                          500,000
    30     (vi)  Western maneuver training area
    19970S0188B0182                 - 17 -

     1         (A)  To acquire three parcels of land,
     2             5,300 acres more or less, to establish
     3             a tracked vehicle maneuver training
     4             area in Western Pennsylvania for the
     5             Pennsylvania National Guard                 8,000,000
     6  (11)  Department of Public Welfare                    $3,924,000
     7     (i)  Norristown State Hospital
     8         (A)  Reconstruction or replacement of
     9             boilers to meet emissions requirements
    10             and upgrade the steam distribution
    11             system                                      3,924,000
    12             (Base Project Allocation - $3,270,000)
    13             (Design and Contingencies - $654,000)
    14  (12)  Pennsylvania State Police                       $4,680,000
    15     (i)  Trevose Station, Bucks County
    16         (A)  Demolition of existing structure and
    17             construction of new building on site        2,000,000
    18     (ii)  Hollidaysburg Troop Headquarters
    19         (A)  Additional funds for DGS 201-3,
    20             renovation and expansion of
    21             headquarters                                2,680,000
    22             (Base Project Allocation - $2,233,000)
    23             (Design and Contingencies - $447,000)
    24  (13)  State System of Higher Education              $560,270,000
    25     (i)  Bloomsburg State University
    26         (A)  Addition to Hartline Science               6,348,000
    27         (B)  Renovation of Navy Hall                    4,288,000
    28         (C)  Renovation of Andrus Building              7,280,000
    29     (ii)  California State University
    30         (A)  Demolition of Reed Hall                      330,000
    19970S0188B0182                 - 18 -

     1         (B)  Renovation of Old Main and South Hall      8,827,000
     2         (C)  Addition to and renovation of Steel
     3             Auditorium                                  5,718,000
     4         (D)  Renovation of Vulcon Hall                  1,668,000
     5         (E)  Renovation of Noss Hall                    3,366,000
     6         (F)  Installation of water back flow
     7             preventers, campuswide                        497,000
     8         (G)  Pedestrian and vehicular enhancement       4,592,000
     9     (iii)  Cheyney University of Pennsylvania
    10         (A)  Addition to and renovation of athletic
    11             facility                                    3,022,000
    12         (B)  Infrastructure renovations                 2,916,000
    13         (C)  Renovation of Bailey Hall                  4,369,000
    14     (iv)  Clarion State University
    15         (A)  Renovate/upgrade communication and
    16             electrical system                           4,944,000
    17         (B)  Replace steam lines - Phase III            5,476,000
    18         (C)  Addition to and renovation of Carlson
    19             Library                                    17,060,000
    20         (D)  Renovation of Pierce Science Center       19,762,000
    21     (v)  East Stroudsburg State University
    22         (A)  Renovation of Rosenkrans Hall              3,875,000
    23         (B)  Addition to and renovation of
    24             auditorium                                  4,900,000
    25         (C)  Renovation of LeRue Arts                     861,000
    26         (D)  Upgrade infrastructure of storm water
    27             management system                           4,920,000
    28         (E)  Addition to and renovation of stadium
    29             complex                                     3,226,000
    30         (F)  Renovation of Fine and Performing Arts
    19970S0188B0182                 - 19 -

     1             Building                                    1,080,000
     2         (G)  Renovation of and addition to
     3             storeroom and garage                        2,378,000
     4     (vi)  Edinboro State University
     5         (A)  Renovation of Butterfield Hall             4,936,000
     6         (B)  Rehabilitation of campus
     7             infrastructure                              5,820,000
     8         (C)  Renovation of Memorial Auditorium          2,498,000
     9         (D)  Renovation of Heather Hall                 2,267,000
    10         (E)  Renovation of Baron-Forness Library        5,772,000
    11     (vii)  Indiana State University
    12         (A)  Renovation of Stabley Library              4,632,000
    13         (B)  Renovation of Wyandt Hall, Armstrong
    14             Campus                                      5,250,000
    15         (C)  Renovation of Old Main, Punxsutawney
    16             Campus                                      4,632,000
    17         (D)  Addition to and renovation of Cogswell
    18             Hall                                        8,888,000
    19         (E)  Renovation of Keith Hall                   7,057,000
    20         (F)  Renovation of John Sutton Hall - Phase
    21             I                                           7,382,000
    22         (G)  Renovation of Leonard Hall                 5,252,000
    23     (viii)  Kutztown State University
    24         (A)  Renovation of Graduate Center              3,598,000
    25         (B)  Addition to and renovation of science
    26             buildings                                  18,662,000
    27         (C)  Construction of Kutztown University
    28             access road                                 2,760,000
    29         (D)  Renovation of Shaeffer Auditorium          5,206,000
    30         (E)  Addition to or renovation of
    19970S0188B0182                 - 20 -

     1             maintenance building                        4,198,000
     2         (F)  Renovation and upgrade of boiler
     3             plant                                       2,857,000
     4         (G)  Renovation of Reisley Hall                 2,635,000
     5     (ix)  Lock Haven State University
     6         (A)  Renovation of New Ulmer Hall               6,720,000
     7         (B)  Renovation of Zimmerli Gym                 7,306,000
     8         (C) Addition to and renovation of Jack
     9             Stadium - Phase III                         2,798,000
    10         (D)  Renovation of Lusk Run Conduit             1,560,000
    11     (x)  Mansfield State University
    12         (A)  Addition to and renovation of Grant
    13             Science                                     9,959,000
    14         (B)  Addition to and renovation of home
    15             economics center                            6,672,000
    16         (C)  Renovation of South Hall                   4,178,000
    17     (xi)  Millersville State University
    18         (A)  Addition to and renovation of McComsey
    19             Hall                                        7,657,000
    20         (B)  Renovation of Gerhart Hall                   236,000
    21         (C)  Addition to and renovation of Stayer
    22             Hall                                        6,835,000
    23         (D)  Renovation of Roddy Science Center         5,870,000
    24         (E)  Renovation of Lyle Hall                    2,681,000
    25         (F)  Renovation of Osburn Hall                  4,198,000
    26         (G)  Renovation of Ganser Building              5,914,000
    27         (H)  Renovation of Wickersham Hall              2,123,000
    28         (I)  Upgrade of electrical utility system       6,480,000
    29     (xii)  Shippensburg State University
    30         (A)  Renovation of Horton Hall                  6,920,000
    19970S0188B0182                 - 21 -

     1         (B)  Renovation of Gilbert and Stewart
     2             Halls                                       3,478,000
     3         (C)  Construction of instructional arts
     4             facility                                   19,853,000
     5         (D)  Addition to and renovation of Lehman
     6             Library                                    19,778,000
     7         (E)  Reconstruction of roadways, sidewalks
     8             and parking facilities                      4,618,000
     9         (F)  Renovation of Franklin Science Center     14,514,000
    10         (G)  Renovation of Huber Arts Center            2,798,000
    11         (H)  Addition to and renovation of Shippen
    12             Hall                                       15,814,000
    13         (I)  Upgrade Steam Plant Boiler No. 4             563,000
    14         (J)  Renovation of Rowland and Shearer
    15             Halls                                       5,167,000
    16         (K)  Renovation of Dauphin Humanities           4,124,000
    17         (L)  Construction of Central Services
    18             Building                                    1,529,000
    19     (xiii)  Slippery Rock State University
    20         (A)  Renovation of Vincent Science
    21             Building                                   13,672,000
    22         (B)  Renovation of West Hall                    2,260,000
    23         (C)  Renovation of Morrow Field House          12,564,000
    24         (D)  Reconstruction of roadways and parking
    25             areas                                       2,244,000
    26         (E)  Construction of health professionals
    27             building                                   12,324,000
    28         (F)  Renovation of steam distribution
    29             system - Phase II                           7,680,000
    30     (xiv)  West Chester State University
    19970S0188B0182                 - 22 -

     1         (A)  Renovation of Francis Harvey Green
     2             Building                                    4,154,000
     3         (B)  Construction of classroom facility        12,959,000
     4         (C)  Renovation of Schmucker Science -
     5             Phase III                                  15,842,000
     6         (D)  Renovation of Lawrence Hall                3,051,000
     7         (E)  Construction of
     8             computing/instructional technology
     9             center                                     10,931,000
    10         (F)  Construction of all-purpose outdoor
    11             physical education and athletic fields      3,314,000
    12         (G)  Infrastructure Upgrade - Phase I          11,158,000
    13         (H)  Construction of Recital Hall               3,317,000
    14         (I)  Addition to and renovation of Eringer
    15             Gym and Special Education Building          3,883,000
    16     (xv)  Systemwide project
    17         (A)  Alteration of facilities for ADA
    18             compliance                                 34,569,000
    19  (14)  Department of Transportation                   $68,972,000
    20     (i)  Road Signage
    21         (A)  Purchase and erection of highway signs
    22             in Fayette, Westmoreland and Somerset
    23             Counties to promote access to Laurel
    24             Highlands                                     400,000
    25     (ii)  Erie County Welcome Center
    26         (A)  Additional funds to construct a new
    27             welcome center                              3,423,000
    28             (Base Project Allocation - $2,759,000)
    29             (Land Allocation - $120,000)
    30             (Design and Contingencies - $544,000)
    19970S0188B0182                 - 23 -

     1     (iii)  Harrisburg International Airport
     2         (A)  Replacement of the concrete surface of
     3             runway 13-31                               11,268,000
     4             (Base Project Allocation - $11,268,000)
     5         (B)  Construction of a centralized de-icing
     6             facility and the modification of the
     7             hold pad at runway 13 for secondary de-
     8             icing                                       8,936,000
     9             (Base Project Allocation - $8,936,000)
    10     (iv)  Allegheny County
    11         (A)  High performance precision
    12             manufacturing technology development by
    13             the Institute for Precision
    14             Technologies for use in bridge
    15             structures, hermetically sealed box
    16             beams and other metal fabricated
    17             infrastructure components for
    18             transportation systems                      1,000,000
    19         (B)  High performance precision
    20             manufacturing technology development by
    21             the Institute for Precision
    22             Technologies for use in bridge
    23             structures, hermetically sealed box
    24             beams and other metal fabricated
    25             infrastructure components for
    26             transportation systems                     25,000,000
    27             (Base Project Allocation - $24,000,000)
    28             (Design and Contingencies - $1,000,000)
    29     (v)  Blair County
    30         (A)  Construction of new maintenance
    19970S0188B0182                 - 24 -

     1             building at District 9-0 headquarters         700,000
     2             (Base Project Allocation - $645,000)
     3             (Design and Contingencies - $55,000)
     4     (vi)  Montgomery County
     5         (A)  Reconstruction and Rehabilitation of
     6             Main Street from Beaver Street to
     7             Prospect Avenue, Borough of North
     8             Wales                                       1,715,000
     9     (vii)  Montour County
    10         (A)  Additional Funds for project DGS 251-
    11             35, construction of transportation
    12             maintenance shed                              500,000
    13     (viii)  Philadelphia, Delaware and Bucks
    14         Counties
    15         (A)  Dredging of the channel of the
    16             Delaware River from 40 to 45 feet          15,000,000
    17     (ix)  City of Erie
    18         (A)  Improvements to city enterprise zone
    19             transportation infrastructure                 530,000
    20     (x)  Tioga County
    21         (A)  Grand Canyon State Airport
    22             (I)  Construction of 20 hangars               500,000
    23             (Base Project Allocation - $400,000)
    24             (Design and Contingencies - $100,000)
    25  Section 4.  Itemization of furniture and equipment projects.
    26     Additional capital projects in the category of public
    27  improvement projects consisting of the acquisition of movable
    28  furniture and equipment to complete public improvement projects
    29  and to be purchased by the Department of General Services, its
    30  successors or assigns, and to be financed by the incurring of
    19970S0188B0182                 - 25 -

     1  debt, are hereby itemized, together with their respective
     2  estimated financial costs, as follows:
     3                                                           Total
     4                                                          Project
     5             Project                                    Allocation
     6  (1)  Department of Agriculture                          $804,000
     7     (i)  Agriculture Laboratory
     8         (A)  Original furniture and equipment for
     9             Agriculture laboratory DGS 700-32             804,000
    10  (2)  Department of Conservation and Natural
    11     Resources                                             $90,000
    12     (i)  Pymatuning State Park
    13         (A)  Original furniture and equipment to
    14             rehabilitate Linesville boat livery DGS
    15             103-4                                          70,000
    16     (ii)  Sinnemahoning State Park
    17         (A)  Original furniture and equipment to
    18             reconstruct spillway and control tower
    19             DGS 104-4                                      20,000
    20  (3)  Department of Education                         $18,037,000
    21     (i)  The Pennsylvania State University
    22         (A)  University Park Campus
    23             (I)  Renovation of animal diagnostic
    24                 laboratory and incinerator DGS 800-
    25                 244                                       240,000
    26             (II)  Electrical distribution system
    27                 DGS 800-217                               390,000
    28         (B)  Behrend Campus
    29             (I)  Multipurpose facility for student
    30                 activities DGS 800-220                  1,550,000
    19970S0188B0182                 - 26 -

     1         (C)  Berks Campus
     2             (I)  Acquisition of land and
     3                 development of an agricultural
     4                 instruction center DGS 800-204            850,000
     5         (D)  Fayette Campus
     6             (I)  Multipurpose technological-
     7                 cultural "Southwest Institute" DGS
     8                 800-209                                   620,000
     9             (II)  Agricultural sciences
    10                 classroom/laboratory building DGS
    11                 800-210                                   460,000
    12             (III)  Biomedical technology center DGS
    13                 800-238                                   660,000
    14         (E)  Harrisburg Campus
    15             (I)  Original furniture and equipment
    16                 for library DGS 800-233                 1,650,000
    17         (F)  New Kensington Campus
    18             (I)  Addition to academic building DGS
    19                 800-212                                   260,000
    20         (G)  Wilkes-Barre Campus
    21             (I)  Technology center DGS 800-218            200,000
    22     (ii)  University of Pittsburgh
    23         (A)  Original furnishings and equipment for
    24             Smith Hall DGS 1103-58 - Greensburg
    25             Campus                                         45,000
    26         (B)  Additional funds for
    27             Classroom/Administration Building DGS
    28             1103-53 - Johnstown Campus                    525,000
    29         (C)  Original furnishings and equipment for
    30             Engineering and Science Center -
    19970S0188B0182                 - 27 -

     1             Johnstown Campus DGS 1103-59                   76,000
     2         (D)  Additional funds for
     3             Convocation/Events Center DGS 1103-48 -
     4             Oakland Campus                              1,458,000
     5         (E)  Additional funds for Multi-Purpose
     6             Academic Complex DGS 1103-40 - Oakland
     7             Campus                                      2,093,000
     8         (F)  Additional funds for Hillman Library
     9             Addition DGS 1103-55 - Oakland Campus         316,000
    10         (G)  Original furnishings and equipment for
    11             Science Building DGS 1103-54 -
    12             Titusville Campus                             195,000
    13         (H)  Original furniture and equipment for
    14             Sports Center expansion - Bradford
    15             Campus                                      2,300,000
    16         (I)  Original furniture and equipment for
    17             Communications, Arts and Technology
    18             Building - Bradford Campus                  2,200,000
    19         (J)  Additional original furniture and
    20             equipment for Bellefield Annex
    21             renovation - Oakland Campus                   199,000
    22     (iii)  Northwest Pennsylvania Technical
    23         Institute
    24         (A)  Original furniture and equipment for
    25             Erie County public learning network         1,000,000
    26     (iv)  Thaddeus Stevens State School of
    27         Technology
    28         (A)  Original furniture and equipment for
    29             multi-purpose activities center and
    30             trade-technical laboratory                    750,000
    19970S0188B0182                 - 28 -

     1  (4)  Historical and Museum Commission                   $362,000
     2     (i)  Railroad Museum of Pennsylvania
     3         (A)  Original furniture and equipment for
     4             locomotive shed DGS 980-3                     220,000
     5     (ii)  Somerset Historical Center
     6         (A)  Original furniture and equipment for
     7             expansion of the visitor center DGS
     8             990-2                                         142,000
     9  (5)  Department of Military Affairs                   $1,093,000
    10     (i)  Southwestern Veterans Home Allegheny
    11         County
    12         (A)  Original furniture and equipment for
    13             the Southwestern Veterans Home DGS 967-
    14             50                                          1,093,000
    15  (6)  Department of Public Welfare                       $926,000
    16     (i)  Youth Detention Facility at Cresson
    17         (A)  Original furniture and equipment for
    18             maximum security youth detention
    19             facility for western Pennsylvania DGS
    20             587-9                                         463,000
    21     (ii)  Youth Detention Facility at South
    22         Mountain
    23         (A)  Original furniture and equipment for
    24             maximum security youth detention
    25             facility for eastern Pennsylvania DGS
    26             557-13                                        463,000
    27  (7)  State System of Higher Education                $30,937,000
    28     (i)  Bloomsburg State University
    29         (A)  Original furniture and equipment for
    30             Centennial Gymnasium DGS 401-51             1,042,000
    19970S0188B0182                 - 29 -

     1         (B)  Original furniture and equipment for
     2             Navy Hall                                     429,000
     3         (C)  Original furniture and equipment for
     4             Hartline Science Center                       952,000
     5     (ii)  California State University
     6         (A)  Original furniture and equipment for
     7             Dixon Hall DGS 402-51                         684,000
     8         (B)  Original furniture and equipment for
     9             Adamson Stadium DGS 402-52                    140,000
    10         (C)  Original furniture and equipment for
    11             World Culture Building DGS 402-53             613,000
    12         (D)  Original furniture and equipment for
    13             Noss Hall                                     337,000
    14         (E)  Original furniture and equipment for
    15             Steele Auditorium                             572,000
    16     (iii)  Clarion State University
    17         (A)  Original furniture and equipment for
    18             Carlson Library                             2,048,000
    19     (iv)  East Stroudsburg State University
    20         (A)  Original furniture and equipment for
    21             Zimbar Gymnasium DGS 405-52                   407,000
    22         (B)  Original furniture and equipment for
    23             Rosenkrans Hall                               386,000
    24         (C)  Original furniture and equipment for
    25             Eiler-Martin Stadium                          323,000
    26     (v)  Edinboro State University
    27         (A)  Original furniture and equipment for
    28             Loveland Hall DGS 406-47                       30,000
    29         (B)  Original furniture and equipment for
    30             Cooper Science DGS 406-51                     234,000
    19970S0188B0182                 - 30 -

     1         (C)  Original furniture and equipment for
     2             Heather Hall                                  227,000
     3         (D)  Original furniture and equipment for
     4             Butterfield Hall                              494,000
     5         (E)  Original furniture and equipment for
     6             Memorial Auditorium                           250,000
     7     (vi)  Indiana University
     8         (A)  Original furniture and equipment for
     9             Clark Hall DGS 407-64                         333,000
    10         (B)  Original furniture and equipment for
    11             Uhler Hall DGS 407-65                         504,000
    12         (C)  Original furniture and equipment for
    13             John Sutton Hall - Phase I                    738,000
    14         (D)  Original furniture and equipment for
    15             Stabley Library                               463,000
    16         (E)  Original furniture and equipment for
    17             Cogswell Hall                                 889,000
    18         (F)  Original furniture and equipment for
    19             Keith Hall                                    706,000
    20     (vii)  Kutztown State University
    21         (A)  Original furniture and equipment for
    22             Athletic Facility DGS 408-54                  280,000
    23         (B)  Original furniture and equipment for
    24             Science Buildings                           1,866,000
    25         (C)  Original furniture and equipment for
    26             Graduate Center                               360,000
    27     (viii)  Lock Haven State University
    28         (A)  Original furniture and equipment for
    29             conversion of Boiler Plant to
    30             Classrooms DGS 409-55                         335,000
    19970S0188B0182                 - 31 -

     1         (B)  Original furniture and equipment for
     2             Clearfield Campus DGS 409-56                  500,000
     3         (C)  Original furniture and equipment for
     4             Rogers Gym DGS 409-57                         311,000
     5         (D)  Original furniture and equipment for
     6             Court House Annex DGS 409-58                  440,000
     7     (ix)  Mansfield State University
     8         (A)  Original furniture and equipment for
     9             renovation of Gymnasium to Facility for
    10             Instruction DGS 401-51                        499,000
    11         (B)  Original furniture and equipment for
    12             Belknap/Retan, DGS 410-49                     768,000
    13     (x)  Millersville State University
    14         (A)  Original furniture and equipment for
    15             McComsey Hall                                 766,000
    16         (B)  Original furniture and equipment for
    17             Osburn Hall                                   420,000
    18         (C)  Original furniture and equipment for
    19             Stayer Hall                                   684,000
    20         (D)  Original furniture and equipment for
    21             Lyle Hall                                     268,000
    22         (E)  Original furniture and equipment for
    23             Roddy Science Center                          704,000
    24         (F)  Original furniture and equipment for
    25             Gerhart Hall                                   24,000
    26     (xi)  Shippensburg State University
    27         (A)  Original furniture and equipment for
    28             Franklin Science Center                     1,742,000
    29         (B)  Original furniture and equipment for
    30             Shippen Hall                                1,581,000
    19970S0188B0182                 - 32 -

     1         (C)  Original furniture and equipment for
     2             Rowland and Shearer Halls                     517,000
     3         (D)  Original furniture and equipment for
     4             Huber Arts and Counselor Education
     5             Building                                      280,000
     6     (xii)  Slippery Rock State University
     7         (A)  Original furniture and equipment for
     8             Vincent Science Building                    1,641,000
     9         (B)  Original furniture and equipment for
    10             Health Professionals Building               1,479,000
    11     (xiii)  West Chester State University
    12         (A)  Original furniture and equipment for
    13             Swope Hall DGS 414-62                         672,000
    14         (B)  Original furniture and equipment for
    15             Schmucker Science - Phase III               1,584,000
    16         (C)  Original furniture and equipment for
    17             Francis Harvey Green Building                 415,000
    18  Section 5.  Itemization of transportation assistance projects.
    19     (a)  Mass transit.--Additional capital projects in the
    20  category of transportation assistance projects for mass transit
    21  in which an interest is to be acquired or constructed by the
    22  Department of Transportation, its successors or assigns, and to
    23  be financed by the incurring of debt, are hereby itemized,
    24  together with their estimated financial costs, as follows:
    25                                                           Total
    26                                                          Project
    27             Project                                    Allocation
    28  (1)  Beaver County Transit Authority
    29     (i)  Purchase of buses and related equipment          185,000
    30     (ii)  Deployment of Intelligent Transportation
    19970S0188B0182                 - 33 -

     1         System                                            300,000
     2  (2)  Berks Area Reading Transportation Authority
     3     (i)  Phase II - Downtown Transportation Center        367,000
     4  (3)  Capitol Area Transit
     5     (i)  Construction of the West Shore Transfer
     6         Center                                            133,000
     7  (4)  Centre Area Transportation Authority
     8     (i)  Purchase of service vehicles and automatic
     9         vehicle locator system                            120,000
    10  (5)  Chambersburg Transit Authority
    11     (i)  Construction or purchase of
    12         administrative, maintenance and storage
    13         facility                                           84,000
    14  (6)  City of Philadelphia
    15     (i)  Locust Street Concourse Improvements -
    16         Construction of Locust Street Concourse
    17         project in the public concourse area under
    18         Locust Street between 12th and 16th
    19         Streets, adjacent to the PATCO Lindenwood
    20         High Speed Line and the 12th and 13th
    21         Streets and 15th and 16th Streets stations        334,000
    22  (7)  Erie Metropolitan Transit Authority
    23     (i)  Construction of a park and ride lot in
    24         Northwest Erie                                    167,000
    25     (ii)  Purchase of replacement buses and related
    26         equipment                                         285,000
    27  (8)  Lehigh and Northampton Transportation
    28     Authority
    29     (i)  Replacement of 25 buses                        1,084,000
    30  (9)  Port Authority of Allegheny County
    19970S0188B0182                 - 34 -

     1     (i)  Fiscal Year 1995-1996 Section 9 Program of
     2         Projects                                        4,500,000
     3     (ii)  Fiscal Year 1995-1996 vehicle overhaul        6,000,000
     4     (iii)  Stage II Light Rail Transit Program         13,499,000
     5     (iv)  Fiscal Year 1995-1996 fixed guideway
     6         modernization projects                          3,500,000
     7     (v)  Environmental cleanup                          2,000,000
     8     (vi)  Fiscal Year 1995-1996 Title I ISTEA
     9         Flexible Funds - PAT Busway Improvements        1,667,000
    10     (vii)  Fiscal Year 1995-1996 Title I ISTEA
    11         Flexible Funds Stage II Light Rail Transit
    12         Program                                         3,333,000
    13     (viii)  Spine Line                                 43,500,000
    14     (ix)  East Busway Extension                        43,500,000
    15     (x)  Bus Procurement                               10,000,000
    16     (xi)  Fiscal Year 1996-1997 Section 9 Program
    17         of Projects                                     4,500,000
    18     (xii)  Fiscal Year 1996-1997 Vehicle Overhaul       6,000,000
    19     (xiii)  Fiscal Year 1997-1998 Vehicle Overhaul      6,000,000
    20     (xiv)   Fiscal Year 1996-1997 Fixed Guideway
    21         Modernization                                   3,500,000
    22     (xv)  Fiscal Year 1996-1997 Title I ISTEA
    23         Flexible Funds - Busway Improvements              167,000
    24  (10)  Southeastern Pennsylvania Transportation
    25     Authority
    26     (i)  Fiscal Year 1995-1996 Infrastructure,
    27         Safety and Renewal Program                      5,000,000
    28     (ii)  Environmental cleanup                         5,000,000
    29     (iii)  Fiscal Year 1995-1996 Vehicle Overhaul
    30         Program                                        40,000,000
    19970S0188B0182                 - 35 -

     1     (iv)  Fiscal Year 1995 Section 9 Program            9,521,000
     2     (v)  Frankford Elevated Reconstruction Projects
     3         - Fiscal Year 1995 Requirement                  8,334,000
     4     (vi)  Fiscal Year 1995 Section 3 Fixed Guideway
     5         Program                                         5,469,000
     6     (vii)  Fiscal Year 1995 Section 9 Approved
     7         Federal Highway Flexed Projects                16,784,000
     8     (viii)  Section 3 Approved Highway Flexing          4,098,000
     9     (ix)  Fiscal Year 1995 Section 3 Bus Purchase       1,250,000
    10     (x)  Chester Transportation Center                  1,250,000
    11     (xi)  Cross County Metro - Major Investment
    12         Study                                             251,000
    13     (xii)  Regional Rail Traction Power/Circuit
    14         Breaker                                           146,000
    15     (xiii)  Fiscal Year 1996-1997 Vehicle Overhaul
    16         Program                                        45,000,000
    17     (xiv)  Fiscal Year 1996-1997 Infrastructure
    18         Safety and Renewal Program                     25,000,000
    19     (xv)  Fiscal Year 1996-1997 Environmental
    20         Cleanup                                         5,000,000
    21     (xvi)  Frankford Elevated Reconstruction
    22         Program - Fiscal Year 1996 Section 3            8,334,000
    23     (xvii)  Fiscal Year 1996 Section 9 Program of
    24         Projects                                        9,316,000
    25     (xviii)  Fiscal Year 1996 Section 3 Program         4,528,000
    26     (xix)  Fiscal Year 1996 Section 3 Bus
    27         Acquisition                                     1,551,000
    28     (xx)  Fiscal Year 1996 Section 3 Alternative
    29         Fuel Buses                                        311,000
    30     (xxi)  North Philadelphia Transportation
    19970S0188B0182                 - 36 -

     1         Center                                            621,000
     2     (xxii)  Fiscal Year 1996 Highway Flexing              432,000
     3  (11)  Shenango Valley Shuttle Service
     4     (i)  Construction of a new transit center and
     5         park and ride facility                            100,000
     6  (12)  Red Rose Transportation Authority
     7     (i)  Construction of a rail station along
     8         Amtrak Line in eastern Lancaster County            68,000
     9  (13)  Williamsport Bureau of Transportation
    10     (i)  Construction of Williamsport Trade and
    11         Transit Intermodal Center                         500,000
    12  (14)  Class 3, Class 4 and Community Public
    13     Transportation Systems
    14     (i)  Projects, including, but not limited to,
    15         purchase of vehicles, vehicle overhaul,
    16         purchase of facilities, facility
    17         renovations, other capital equipment and
    18         associated capital items for Fiscal Year
    19         1996-1997                                       7,500,000
    20  (15)  Department of Transportation
    21     (i)  Purchase of rail passenger equipment and
    22         rail infrastructure improvements                1,800,000
    23     (b)  Rural and intercity rail.--Additional capital projects
    24  in the category of transportation assistance projects for rural
    25  and intercity rail service projects to be constructed or with
    26  respect to which an interest is to be acquired by the Department
    27  of Transportation, its successors or assigns, and to be financed
    28  by the incurring of debt, are hereby itemized, together with
    29  their respective estimated financial costs, as follows:
    30                                                           Total
    19970S0188B0182                 - 37 -

     1                                                          Project
     2             Project                                    Allocation
     3  (1)  Allegheny County
     4     (i)  Purchase of the Wheeling and Lake Erie
     5         Railway                                        12,000,000
     6     (ii)  Construction of railroad connection to
     7         interchange Wheeling and Lake Erie traffic
     8         to Pittsburgh Industrial Railroad to
     9         reestablish CSXT interchange South of
    10         Bridgeville between Milepost 57 and
    11         Milepost 61                                     2,500,000
    12     (iii)  Wheeling and Lake Erie Railroad line
    13         rehabilitation                                  1,500,000
    14     (iv)  Purchase of a portion of West End Branch
    15         of Wheeling Lake Erie Railway Right-of-way
    16         to accommodate West End Circle Project of
    17         PennDOT and construction of railroad
    18         connection to interchange Wheeling and Lake
    19         Erie traffic to Pittsburgh Industrial
    20         Railroad to reestablish CSXT interchange
    21         south of Bridgeville between Milepost 57
    22         and Milepost 61                                12,500,000
    23     (v)  Purchase of West End Branch of Wheeling
    24         Lake Erie Railway from Steuben Street to
    25         Wabash Tunnel to accommodate Banksville
    26         Interchange at 1-279 and the development of
    27         HOV corridor                                    6,500,000
    28     (vi)  Purchase Wheeling and Lake Erie Railway
    29         main right-of-way from Rook Yard (Milepost
    30         56 to Longview Milepost 46) to create two
    19970S0188B0182                 - 38 -

     1         new transportation corridors to downtown
     2         Pittsburgh                                     18,000,000
     3     (vii)  Wheeling & Lake Erie Railway Company
     4         (A)  Replacement of deteriorated crossties
     5             on former P & WV rail line that runs
     6             for 38.6 miles between Pierce and
     7             Connellsville to allow for intermodal
     8             traffic or expected volume of iron ore
     9             trains                                        800,000
    10             (Base Project Allocation - $720,000)
    11             (Design and Contingencies - $80,000)
    12     (viii)  Development of intermodal
    13         transportation and distribution facility in
    14         Leetsdale                                       1,250,000
    15  (2)  Berks County
    16     (i)  Reading, Blue Mountain and Northern
    17         Railroad
    18         (A)  Construction of connection from USRA
    19             Line No. 197b to Reading & Northern
    20             Railroad at Temple                            800,000
    21  (3)  Blair County
    22     (i)  Morrison's Cove Railroad
    23         (A)  Replace three sections of existing
    24             track with heavy rail for approximately
    25             3.0 miles to handle existing traffic on
    26             the Morrison's Cove Railroad and the
    27             Martinsburg Branch; replace track
    28             switches; upgrade three grade
    29             crossings                                     396,000
    30  (4)  Bucks County
    19970S0188B0182                 - 39 -

     1     (i)  Bristol Industrial Park
     2         (A)  Construction of industrial terminal
     3             railway extension                             125,000
     4  (5)  Butler County
     5     (i)  Buffalo and Pittsburgh Railroad
     6         (A)  Construction of new rail side track
     7             and four new turnouts                         200,000
     8         (B)  Johnsonburg Bypass rail connection
     9             between Buffalo and Pittsburgh Railroad
    10             and the Allegheny and Eastern Railroad      3,200,000
    11         (C)  Mainline from Punxsutawney to Falls
    12             Creek                                       1,000,000
    13     (ii)  Genesee and Wyoming Railroad
    14         (A)  Butler to Bruin                            1,800,000
    15  (6)  Carbon and Schuylkill Counties
    16     (i)  Rehabilitation of railroad tracks
    17         connecting the Boroughs of Lansford and
    18         Tamaqua                                           700,000
    19  (7)  Centre County
    20     (i)  SEDA-COG Whiterock Quarry track
    21         (A)  Track rehabilitation and construction      1,400,000
    22  (8)  Chester County
    23     (i)  Brandywine Valley Railroad
    24         (A)  Elevate track and construct retaining
    25             wall to prevent continual washouts from
    26             Brandywine Creek in South Coatesville         405,000
    27  (9)  Clinton, Centre and Blair Counties
    28     (i)  SEDA-COG Joint Rail Authority
    29         (A)  Nittany and Bald Eagle Railroad
    30             Rehabilitation                              3,000,000
    19970S0188B0182                 - 40 -

     1         (B)  Commonwealth supported rail welding
     2             project                                     3,000,000
     3  (10)  Elk County
     4     (i)  Genesee and Wyoming Railroad
     5         (A)  Johnsonburg to New York State Line         3,200,000
     6  (11)  Erie and Crawford Counties
     7     (i)  Allegheny and Eastern Railroad, Inc.
     8         (A)  From Milepost 8 to Milepost 19,
     9             rehabilitation and upgrade of 11 miles
    10             of Allegheny and Eastern Railroad used
    11             for traffic moving to or from Conrail
    12             interchange at Erie. Includes
    13             rehabilitation of rails, new ties and
    14             other roadbed improvements                    275,000
    15     (ii)  Northwestern Pennsylvania Railroad
    16         (A)  Upgrade of rail line to Federal
    17             Railway Administration Class II
    18             condition                                     250,000
    19  (12)  Fayette County
    20     (i)  Completion of CSX rail acquisition in
    21         Fayette County                                  1,800,000
    22     (ii)  Southwest Pennsylvania Rail
    23         Rehabilitation Program                          1,200,000
    24     (iii)  Fay-Penn Transportation Company
    25         (A)  Rehabilitation of 21.6 miles of rail
    26             line from Fair Chance Business Park to
    27             Mt. Pleasant in Westmoreland County           750,000
    28  (13)  Indiana County
    29     (i)  Genesee and Wyoming Railroad
    30         (A)  Punxsutawney to Falls Creek                1,000,000
    19970S0188B0182                 - 41 -

     1     (ii)  Pittsburgh and Shawmut Railroad
     2         (A)  Rehabilitation of Pittsburgh and
     3             Shawmut Railroad between Driftwood and
     4             Kittanning, including replacement of
     5             21,797 feet of rail, replacement of
     6             deteriorating ties, resurface rail bed,
     7             renew road crossings and other
     8             miscellaneous rehabilitation                1,500,000
     9  (14)  Mifflin County
    10     (i)  SEDA-COG Joint Rail Authority
    11         (A)  Juniata Valley Railroad
    12             Reconstruction                              3,000,000
    13  (15)  Monroe County
    14     (i)  Monroe County Railroad Authority
    15         (A)  Rehabilitation of 17 miles of rail
    16             line to FRA Class III standards
    17             including purchase and installation of
    18             new crossties, raise, line and surface
    19             the entire 17 mile rail line and
    20             purchase and install relay rail on
    21             various curves on the rail line               861,000
    22         (B)  Purchase of railroad right-of-way and
    23             relay rail on approximately 1.5 miles
    24             including a bridge over the Delaware
    25             River to allow the final linkage of
    26             track between Pennsylvania and New
    27             Jersey to reopen the passenger and
    28             freight corridor between the Pocono
    29             Mountain region of Pennsylvania and New
    30             York City                                     985,000
    19970S0188B0182                 - 42 -

     1  (16)  Montgomery County
     2     (i)  Upper Merion and Plymouth Railroad
     3         (A)  Add three storage tracks in Plymouth
     4             Township and construct a holding/run-a-
     5             round track in Upper Merion Township at
     6             Swedeland Yard                                420,000
     7     (ii)  Lukens, Inc.
     8         (A)  Upgrade Lukens Steel Mainline Rail
     9             facilities with ties, rails, switch
    10             appurtenances and roadbed upgrade from
    11             East to West end of plant                     440,000
    12  (17)  Northumberland, Montour and Columbia
    13     Counties
    14     (i)  SEDA-COG Joint Rail Authority
    15         (A)  Stabilize track for the North Shore
    16             Railroad to maintain Class II service         375,000
    17  (18)  Philadelphia County
    18     (i)  West Philadelphia Transportation Center
    19         (A)  Rehabilitation and transformation of
    20             the old 52nd and Lancaster Streets rail
    21             station into an intermodal
    22             transportation center                       2,810,000
    23             (Base Construction Allocation -
    24             $2,300,000)
    25             (Design and Contingencies - $510,000)
    26     (ii)  Delaware and Hudson Railway Company
    27         (A)  Philadelphia Naval Base track
    28             rehabilitation, rehabilitate running
    29             track from CP Penrose to Naval Yard
    30             switch and running track and adjacent
    19970S0188B0182                 - 43 -

     1             bulk loading facility, as well as four
     2             stub tracks west of Roundhouse                550,000
     3             (Base Project Allocation - $495,000)
     4             (Design and Contingencies - $55,000)
     5  (19)  Schuylkill County
     6     (i)  Reading, Blue Mountain and Northern
     7         Railroad
     8         (A)  Rehabilitate Tamaqua and Mahanoy
     9             Tunnels, including strengthening of
    10             roof structure, installation of
    11             drainage system and renewing the rail,
    12             ties and ballast in the 900-foot
    13             Tamaqua Tunnel located 2 miles north of
    14             Tamaqua and in the 3,500-foot Mahanoy
    15             Tunnel located near Buck Mountain             640,000
    16  (20)  Washington County
    17     (i)  Wheeling & Lake Erie Railway Company
    18         (A)  Replace, on accelerated safety basis,
    19             deck bridge ties and miscellaneous
    20             repairs on Mingo Creek Valley Bridge
    21             and Pigeon Creek Valley Bridge near
    22             Charleroi to accommodate current
    23             traffic and future intermodal traffic
    24             on Wheeling Main Line between Rook Yard
    25             and Connellsville                             375,000
    26             (Base Project Allocation - $337,000)
    27             (Design and Contingencies - $38,000)
    28         (B)  Emergency repairs needed to support
    29             rail infrastructure damaged by water-
    30             related hydraulic blowout along 200
    19970S0188B0182                 - 44 -

     1             feet of side hill fill near Charleroi
     2             and to repair catastrophic
     3             deterioration of subgrade east of
     4             Pittsburgh Rook Yard, including
     5             rebuilding of lost subgrade, repair of
     6             subsidence of various other fills and
     7             other rehabilitations to restore
     8             customer railroad service and railroad
     9             connections east of Pittsburgh                475,000
    10             (Base Project Allocation - $427,000)
    11             (Design and Contingencies - $48,000)
    12  (21)  Westmoreland County
    13     (i)  Westmoreland County Industrial Development
    14         Corporation
    15         (A)  Construction of a spur from site of
    16             proposed Sony Glass Plant                     163,000
    17         (B)  Greensburg Cluster/CSX -
    18             reconstruction of rail lines                  500,000
    19  (22)  York County
    20     (i)  Maryland and Pennsylvania Railroad
    21         (A)  Rehabilitation of Poorhouse Yard rail
    22             and turnouts                                  424,000
    23         (B)  Accelerated rehabilitation of 2.5
    24             miles of original rail on East Branch
    25             to avoid derailments and eliminate
    26             damage to customer shipments,
    27             including, but not limited to, new
    28             rail, crossties, improved drainage
    29             system and new ballast                        704,000
    30     (ii)  Emons Logistics Services, Inc.
    19970S0188B0182                 - 45 -

     1         (A)  Installation of new track system,
     2             environmental controls, heating, paving
     3             and the construction of bulk intermodal
     4             transfer terminal on York Rail
     5             including facilities to prevent
     6             contamination of project and to protect
     7             from inclement weather                      1,275,000
     8     (iii)  York Rail
     9         (A)  Construction of rail siding to serve
    10             new warehouse of York County Industrial
    11             Development Corporation                       165,000
    12  (23)  Buffalo and Pittsburgh Railroad
    13     (i)  Additional funds for rehabilitation of
    14         various mainline segments of Buffalo and
    15         Pittsburgh Railroad to Class III and/or
    16         Class II standards
    17         (A)  Butler to Bruin mainline track road
    18             crossing and bridge work
    19             rehabilitation                              3,000,000
    20         (B)  Mainline from Falls Creek (DuBois) to
    21             Ridgeway                                    2,300,000
    22         (C)  Mainline from Ridgeway to Johnsonburg
    23             - relocation of B&P track and
    24             consolidation of traffic from
    25             Johnsonburg to Ridgway                      3,925,000
    26         (D)  Mainline from Eidenau to Punxsutawney
    27             - Phase 2                                   2,575,000
    28     (c)  Air transportation.--Additional capital projects in the
    29  category of transportation assistance projects for air
    30  transportation service to which an interest is to be acquired by
    19970S0188B0182                 - 46 -

     1  the Department of Transportation, its successors or assigns, and
     2  to be financed by the incurring of debt are hereby itemized,
     3  together with their respective estimated financial costs, as
     4  follows:                                                 Total
     5                                                          Project
     6             Project                                    Allocation
     7  (1)  Connellsville Airport, Fayette County
     8     (i)  Rehabilitation of runway, taxiway and
     9         runway lighting                                    35,000
    10     (ii)  Expansion of current runway and other
    11         airport improvements                           17,000,000
    12  (2)  Clearfield-Jefferson County Regional Airport
    13     Authority
    14     (i)  Renovate Beechwoods Administration
    15         Building                                          150,000
    16     (ii)  Upgrade and renovate crash, fire and
    17         rescue building                                    15,000
    18     (iii)  Renovate terminal building                      66,000
    19     (iv)  Renovate Mesa hangar                            125,000
    20     (v)  Remove contaminated soil at fuel farm            100,000
    21     (vi)  Acquisition of 1,000-gallon jet fuel
    22         truck                                              80,000
    23     (vii)  Acquisition of disabled passenger lift          20,000
    24     (viii)  Construction of access road to new T-
    25         hangar                                             50,000
    26  (3)  St. Marys Airport Authority
    27     (i)  Refurbish existing hangars                        89,000
    28     (ii)  Purchase of grass cutting and landscape
    29         equipment                                         100,000
    30     (iii)  Construction of new commercial hangar          125,000
    19970S0188B0182                 - 47 -

     1     (iv)  Construction of new T-hangar                    120,000
     2     (v)  Construction of new terminal building            160,000
     3     (vi)  Maintenance equipment                             7,000
     4     (vii)  Storage building and sidewalks                   7,000
     5     (viii)  Unicom radios and weather station               7,000
     6     (ix)  Sewage system and utilities                     300,000
     7     (x)  Rehab tiedown apron and construct T-
     8         hangar                                             10,000
     9     (xi)  Storm water management plan                       3,000
    10     (xii)  Snow removal equipment                           7,000
    11     (xiii)  Runway reconstruction and access road
    12         relocation                                         38,000
    13     (xiv)  Extend runway 700 feet                          50,000
    14     (xv)  Master plan update AWO5 III                      10,000
    15  (4)  Bradford Regional Airport Authority
    16     (i)  Construct new T-hangar                           300,000
    17     (ii)  Construct corporate hangar                      300,000
    18     (iii)  Replace door on corporate hangar                28,000
    19     (iv)  Expand snow equipment building, purchase
    20         snow plow                                          12,000
    21  (5)  Corry Lawrence Airport Authority
    22     (i)  Perimeter fencing and snow removal
    23         equipment                                          22,000
    24     (ii)  Construct new aircraft hangar                   198,000
    25     (iii)  Construct addition to terminal building         83,000
    26     (iv)  Seal coat runway, taxiways, apron and
    27         paint markings                                     60,000
    28     (v)  Expand parking area                               28,000
    29     (vi)  Property acquisition                             35,000
    30     (vii)  Snow removal equipment                           4,000
    19970S0188B0182                 - 48 -

     1     (viii)  Purchase backhoe                               21,000
     2     (ix)  Construct hangar taxiway                          8,000
     3     (x)  Master plan update                                 1,000
     4     (xi)  Rotating beacon                                   4,000
     5     (xii)  Construct hangars                              263,000
     6     (xiii)  Purchase crack sealing machine                 26,000
     7     (xiv)  Obstruction removal                              2,000
     8  (6)  Fayette County Airport Authority
     9     (i)  Expansion Project                             17,000,000
    10     (ii)  Fayette County Air Transportation
    11         Strategic Planning Study                          100,000
    12  (7)  Reading Regional Airport Authority
    13     (i)  Renovation and widening of Leisz's Bridge
    14         and Mitchell Roads                              1,000,000
    15     (ii)  Construction of a noise barrier wall
    16         around the run-up area                             50,000
    17     (iii)  Purchase airfield turf maintenance
    18         equipment                                         125,000
    19     (iv)  Purchase airfield and property CAD
    20         system                                             25,000
    21  (8)  Westmoreland County Airport, Westmoreland
    22     County
    23     (i)  Modernization of the main terminal
    24         building and expansion of the commercial
    25         service wing and parking                        1,800,000
    26  (9)  Lancaster Airport
    27     (i)  Terminal expansion                               337,000
    28  (10)  Bedford County Air Industrial Authority
    29     (i)  Lengthening of runway/taxiway and building
    30         of an access road                                 378,000
    19970S0188B0182                 - 49 -

     1  (11)  Blair County Airport Authority
     2     (i)  Lengthening and strengthening of runways      22,000,000
     3  (12)  Huntingdon County
     4     (i)  Acquisition and improvements to the
     5         existing airport                                1,200,000
     6  (13)  Venango Regional Airport
     7     (i)  Property acquisition                              35,000
     8     (ii)  Snow removal equipment                            4,000
     9     (iii)  Purchase backhoe                                21,000
    10     (iv)  Construct hangar taxiway                          8,000
    11     (v)  Master plan update                                 1,000
    12     (vi)  Rotating beacon                                   4,000
    13     (vii)  Construct hangars                              263,000
    14     (viii)  Purchase crack sealing machine                 26,000
    15     (ix)  Obstruction removal                               2,000
    16  (14)  Allegheny County Airport
    17     (i)  Rehabilitation of runway 5-23, hangar 40,
    18         taxiways and construction of new hangars        5,575,000
    19  (15)  Beaver County Airport
    20     (i)  Navigational aids update - relocate
    21         compass rose, lighted wind cone, beacon and
    22         AWOS                                              200,000
    23     (ii)  High intensity runway lights and medium
    24         intensity taxiway lights                          400,000
    25     (iii)  Construction of T-hangar - four to ten
    26         single-hangar and twin-hangar units               920,000
    27     (iv)  Terminal expansion                              500,000
    28     (v)  Resurface main apron                             600,000
    29     (vi)  Apron and taxiway rehabilitation                667,000
    30     (vii)  Storm water management system                  556,000
    19970S0188B0182                 - 50 -

     1     (viii)  Resurface parking areas                       200,000
     2  Section 6.  Itemization of redevelopment assistance projects.
     3     Additional capital projects in the category of redevelopment
     4  assistance projects for capital grants by the Department of
     5  Community and Economic Development, its successors or assigns,
     6  authorized under the provisions of the act of May 20, 1949
     7  (P.L.1633, No.493), known as the Housing and Redevelopment
     8  Assistance Law, and redevelopment assistance capital projects
     9  and to be financed by the incurring of debt, are hereby
    10  itemized, together with their estimated financial costs, as
    11  follows:
    12                                                           Total
    13                                                          Project
    14             Project                                    Allocation
    15  (1)  Adams County
    16     (i)  Development of historic pathway on Lincoln
    17         Square, Borough of Gettysburg                   5,100,000
    18  (2)  Allegheny County
    19     (i)  City of Pittsburgh
    20         (A)  Senator John Heinz Pittsburgh Regional
    21             History Center - Completion of the
    22             development of Senator John Heinz
    23             Pittsburgh Regional History Center          5,000,000
    24         (B)  Pittsburgh Technology Center Site
    25             Development - Continued development and
    26             expansion of the Pittsburgh Technology
    27             Center to include the LTV site on the
    28             Southside                                  38,000,000
    29         (C)  Three Rivers Stadium enhancements         75,000,000
    30         (D)  Greater Pittsburgh Community Food
    19970S0188B0182                 - 51 -

     1             Bank                                        1,000,000
     2         (E)  Fifth Avenue, Forbes Avenue and Wood
     3             Street, infrastructure acquisition,
     4             demolition, reconstruction and public
     5             space improvements                         20,000,000
     6         (F)  Nine Mile Run, environmental
     7             reclamation and site preparation           20,000,000
     8         (G)  Life Science Development Incubator,
     9             infrastructure improvements                10,000,000
    10         (H)  Software Product Development Center,
    11             land acquisition and infrastructure
    12             improvements                               10,000,000
    13         (I)  Rockwell Site Development                 10,000,000
    14         (J)  Byham Theater, Phase III renovation        3,500,000
    15         (K)  For the acquisition and renovation of
    16             the existing Coraopolis Rail Station
    17             for the Coraopolis Railroad Museum          3,000,000
    18         (L)  Mattress Factory - Federal North
    19             Project - Transformation of an adult
    20             theater adjacent to Allegheny General
    21             Hospital to provide for an area
    22             integrating arts, education, commerce
    23             and residences                              3,500,000
    24         (M)  Hot metal bridge reconstruction and
    25             rehabilitation to connect Pittsburgh
    26             Technology Center to the LTV site on
    27             the south side                              2,500,000
    28         (N)  Pittsburgh African-American Museum         1,500,000
    29         (O)  Pennsylvania Public Law Center             5,500,000
    30         (P)  Acquisition and rehabilitation of
    19970S0188B0182                 - 52 -

     1             property for programmatic space on
     2             Jacksonia Street and Sampsonia Way for
     3             the Mattress Factory Art Institution          500,000
     4     (ii)  City of Duquesne
     5         (A)  Cochrandale Redevelopment,
     6             acquisition, demolition and site
     7             development                                 1,200,000
     8         (B)  Kennywood Site Development,
     9             acquisition, and site development           2,000,000
    10         (C)  Plaza Redevelopment, acquisition and
    11             site development                            1,000,000
    12         (D)  City Center of Duquesne entrance, site
    13             improvements                                  600,000
    14     (iii)  County projects
    15         (A)  Tech World Site Development -
    16             Development of a technology center near
    17             the Greater Pittsburgh International
    18             Airport, including site clearance,
    19             remediation and infrastructure to
    20             support research and development, as
    21             well as light industrial developments     190,000,000
    22         (B)  Homestead Redevelopment/Site
    23             Development - New onsite access
    24             roadways and related infrastructure to
    25             support private development                 7,000,000
    26         (C)  Industrial Center of McKeesport Pipe
    27                 Mill - Redevelopment of the Pipe
    28                 Mill building on the site of former
    29                 USX McKeesport National Works into
    30                 a multitenant industrial and
    19970S0188B0182                 - 53 -

     1                 business facility                       5,060,000
     2         (D)  Keystone Commons Braddock Avenue
     3                 Intermodal Facility - Development
     4                 of an intermodal facility to
     5                 relieve traffic and parking
     6                 congestion on the redevelopment
     7                 site of the former Westinghouse
     8                 East Pittsburgh Plant                   4,000,000
     9         (E)  Working Steel Museum - Construction of
    10             a tourism attraction reflecting the
    11             history of steelmaking in southwestern
    12             Pennsylvania                               25,000,000
    13         (F)  McKees Point II - Site improvements at
    14             McKees Point to enhance improvements
    15             undertaken in Phase I                       1,500,000
    16         (G)  301 Fifth Avenue Building - Renovation
    17             activities on publicly owned building
    18             in downtown McKeesport that serves as a
    19             center for social and public services
    20             and job creation                            1,000,000
    21         (H)  Lysle Boulevard and Sixth Avenue
    22             Parking Garages - Renovation of two
    23             multistory parking garages in downtown
    24             McKeesport                                  1,500,000
    25         (I)  Neighborhood Preservation
    26             Market/Walnut Corridor - Acquisition of
    27             blighted, tax delinquent properties in
    28             the Market/Walnut Corridor, demolition
    29             of blighted structures and abandoned
    30             public housing facility in conjunction
    19970S0188B0182                 - 54 -

     1             with State Route 148 improvements,
     2             Yough River Trail and new development
     3             in this area                                1,000,000
     4         (J)  Development initiatives at various
     5             sites in Allegheny County/Pittsburgh
     6             International Airport Area                 50,000,000
     7         (K)  Steel Valley Redevelopment Project         6,262,000
     8         (L)  Findlay Connector                          3,000,000
     9         (M)  Pittsburgh International Airport
    10             enhanced transit system                     5,000,000
    11         (N)  Carnegie Mall Project                      1,600,000
    12         (O)  Parkway West and Interstate 79
    13             interchange completion                     15,000,000
    14     (iv)  West Mifflin Borough
    15         (A)  Nobile Drive Sanitary Sewer                  500,000
    16     (v)  Wilkinsburg Borough
    17         (A)  Renaissance Development Area                 300,000
    18     (vi)  Millvale Borough
    19         (A)  Millvale riverfront development            2,200,000
    20  (3)  Berks County
    21     (i)  City of Reading
    22         (A)  Improvements to municipal stadium            200,000
    23  (4)  Blair County
    24     (i)  County Projects
    25         (A)  Construction and Development of Blair
    26             County baseball field and stadium          10,000,000
    27     (ii)  SR 0220
    28         (A)  Improve access from SR 0220 along Ski
    29             Gap Road to Blue Knob                      11,000,000
    30     (iii)  Tyrone Borough
    19970S0188B0182                 - 55 -

     1         (A)  Tyrone Historic Railroad Park - Phase
     2             I                                              75,000
     3     (iv)  Altoona-Blair County Development
     4         Corporation
     5         (A)  Multi-Modal Industrial Park
     6             Distribution Center                         3,000,000
     7         (B)  Altoona-Blair County Air Park - Air
     8             Freight/Air Cargo Distribution
     9             Facilities                                  3,500,000
    10         (C)  Business/Research Park - I-99 Corridor
    11             Location                                    2,500,000
    12         (D)  Entrepreneurial/Business Resource
    13             Center                                      2,500,000
    14  (5)  Chester County
    15     (i)  Tredyffrin Township
    16         (A)  Rehabilitation of Strafford Railroad
    17             Station                                       450,000
    18  (6)  Dauphin County
    19     (i)  City of Harrisburg
    20         (A)  Construction and Development of the
    21             Pennsylvania Sports Hall of Fame
    22             Museum, City Island, Harrisburg             5,525,000
    23  (7)  Erie County
    24     (i)  City of Erie
    25         (A)  Construction of the Pennsylvania
    26             Aquarium                                   15,000,000
    27         (B)  Renovations of and improvements to the
    28             Erie Zoo and Discover Asia Zoo              1,600,000
    29         (C)  Downtown commercial revitalization         1,000,000
    30         (D)  Erie Art Museum Expansion                    625,000
    19970S0188B0182                 - 56 -

     1         (E)  Boston Store Rehabilitation               13,000,000
     2     (ii)  County Project
     3         (A)  Improvements to Fairview Industrial
     4             Park                                        3,000,000
     5  (8)  Fayette County
     6     (i)  City of Uniontown
     7         (A)  Fayette County Cultural Heritage
     8             Project                                     5,000,000
     9         (B)  Uniontown Parking Project                    900,000
    10     (ii)  County Projects
    11         (A)  Construction of a Coal and Coke
    12             Interpreting Center                         3,000,000
    13         (B)  Industrial Park Project                    1,700,000
    14         (C)  Infrastructure Expansion Project           6,500,000
    15         (D)  Fayette County Courthouse Renovations        500,000
    16     (iii)  Fayette County Redevelopment Authority
    17         (A)  Fayette County Cultural Heritage
    18             Project                                     4,800,000
    19         (B)  Fayette County Infrastructure
    20             Development Project                         9,000,000
    21         (C)  Fayette County Multiple Occupancy
    22             Building and Incubator Project              2,100,000
    23         (D)  Fayette County Visitor Center Project        650,000
    24         (E)  Fayette County Industrial Park
    25             Project                                     1,700,000
    26         (F)  Laurel Highlands Signage Project             500,000
    27     (iv)  Connellsville Redevelopment Authority
    28         (A)  Connellsville Redevelopment Project        1,000,000
    29  (9)  Lackawanna County
    30     (i)  City of Carbondale
    19970S0188B0182                 - 57 -

     1         (A)  Renovate Carbondale City Hall and
     2             courthouse                                    500,000
     3  (10)  Lancaster County
     4     (i)  City of Manheim
     5         (A)  Rehabilitation of the Pennsylvania
     6             Baptist State Convention Center             4,440,000
     7             (Base Construction Allocation -
     8             $3,600,000)
     9             (Design and Contingencies - $840,000)
    10  (11)  Luzerne County
    11     (i)  Wyoming Valley Sanitary Authority
    12         (A)  Westwater Treatment Plant,
    13             construction of an automated hydrated
    14             lime system                                   500,000
    15         (B)  Rehabilitation and maintenance of
    16             individual member municipal sanitary
    17             sewer systems                               5,000,000
    18  (12)  Northumberland County
    19     (i)  City of Sunbury
    20         (A)  Improvements to Hunter House at Fort
    21             Augusta                                       600,000
    22  (13)  Philadelphia County
    23     (i)  City of Philadelphia
    24         (A)  Construction of Eastern Regional
    25             Police Training Facility                    7,500,000
    26         (B)  Restoration and renovation of the
    27             Sedgwick Theater as a multipurpose
    28             cultural and arts center                    1,200,000
    29         (C)  City Recreation Department -
    30             Renovation of Lonnie Young Recreation
    19970S0188B0182                 - 58 -

     1             Center                                      1,500,000
     2         (D)  Schuylkill River Development Council -
     3             For site development for Phase III of
     4             the Schuylkill River Park project           2,000,000
     5         (E)  Center for Human Advancement -
     6             Challenger Learning Center
     7             rehabilitation for the Center for Human
     8             Advancement, including the development
     9             of the Challenger Learning Center           2,200,000
    10             (Base Project Allocation - $1,800,000)
    11             (Design and Contingencies - $400,000)
    12         (F)  Intercultural Family Services -
    13             Rehabilitation of the main facility of
    14             the Intercultural Family Services
    15             Center and construction of a new health
    16             services annex                              1,350,000
    17             (Base Project Allocation - $1,100,000)
    18             (Design and Contingencies - $250,000)
    19         (G)  West Market Revitalization Project -
    20             Rehabilitation of West Market Street
    21             from 40th to 52nd Street to include
    22             retail development, economic
    23             development and public improvements         4,220,000
    24             (Base Project Allocation - $3,400,000)
    25             (Design and Contingencies - $820,000)
    26         (H)  Shoemaker Family Center -
    27             Rehabilitation of the Shoemaker Middle
    28             School into a fully restored and
    29             technologically equipped educational
    30             complex along with a full service
    19970S0188B0182                 - 59 -

     1             family support center                       2,080,000
     2             (Base Project Allocation - $1,700,000)
     3             (Design and Contingencies - $380,000)
     4         (I)  Structural renovation and installation
     5             of fiber technology at the George
     6             Institute Free Library                      1,465,000
     7             (Base Construction Allocation -
     8             $1,200,000)
     9             (Design and Contingencies - $265,000)
    10         (J)  Development and construction of a
    11             major retail complex in the West
    12             Parkside community                          5,005,000
    13             (Base Construction Allocation -
    14             $4,100,000)
    15             (Design and Contingencies - $905,000)
    16         (K)  Revitalization of the Conestoga
    17             Recreation Center in West Philadelphia      1,235,000
    18             (Base Construction Allocation -
    19             $1,000,000)
    20             (Design and Contingencies - $ 235,000)
    21         (L)  Construction of the National
    22             Constitution Center on the second block
    23             of Independence Mall between Market
    24             Street and Arch Street                     30,000,000
    25         (M)  For facility construction and
    26             renovations to the Please Touch Museum      5,000,000
    27         (N)  Enhancements to Veterans Stadium          75,000,000
    28         (O)  Continued development for the Avenue
    29             of the Arts                                20,000,000
    30         (P)  Construction of a Primate House at the
    19970S0188B0182                 - 60 -

     1             Philadelphia Zoo                            3,500,000
     2         (Q)  Neighborhood Preservation acquisition
     3             and development                             4,500,000
     4         (R)  Development Initiatives in
     5             Philadelphia County                        35,000,000
     6         (S)  Fairmount Park Commission -
     7             rehabilitation and site development for
     8             Schuylkill River                           18,000,000
     9         (T)  Fire and safety rehabilitation for the
    10             Philadelphia Art Museum                     7,000,000
    11         (U)  For the development of the Gateway
    12             Visitor Center on the Mall in
    13             Independence National Historic Park        10,000,000
    14         (V)  St. Phillip's Community Development
    15             Corporation for capital improvement and
    16             housing development in North Central
    17             Empowerment Zone                              500,000
    18  (14)  Pike County
    19     (i)  Pike County Center for the Performing
    20         Arts                                            7,500,000
    21  (15)  Schuylkill County
    22     (i)  Borough of Tamaqua
    23         (A)  Improvements to Tamaqua Train Station        250,000
    24  (16)  Somerset County
    25         (A)  Somerset County Bicentennial
    26             Industrial Park Project                       626,000
    27  (17)  Westmoreland County
    28     (i)  Rostraver
    29         (A)  Acquisition and/or construction of a
    30             combination public library and senior
    19970S0188B0182                 - 61 -

     1             citizen center                              2,000,000
     2  (18)  York County
     3     (i)  City of York
     4         (A)  Hoffman Stadium Reconstruction             6,000,000
     5         (B)  Public improvements in support of the
     6             Boundry Avenue redevelopment project        3,300,000
     7         (C)  George Street two-way conversion
     8             project                                       850,000
     9         (D)  Mural project infrastructure
    10             improvements                                1,000,000
    11         (E)  George Street gateway improvements           600,000
    12         (F)  Penn and Farquhar Park renovations           500,000
    13  Section 7.  Itemization of flood control projects.
    14     Additional capital projects in the category of flood control
    15  projects to be constructed by the Department of Environmental
    16  Protection, its successors or assigns, and to be financed by the
    17  incurring of debt are hereby itemized, together with their
    18  respective estimated costs, as follows:
    19                                                           Total
    20                                                          Project
    21             Project                                    Allocation
    22  (1)  Department of Environmental Protection          $20,456,000
    23     (i)  Allegheny County
    24         (A)  Additional funds for Turtle Creek
    25             Flood Control Project                         383,000
    26             (Base Project Allocation - $383,000)
    27     (ii)  Bedford County
    28         (A)  Borough of Hyndman - Wills Creek
    29             Restoration Project                           373,000
    30     (iii)  Cumberland County
    19970S0188B0182                 - 62 -

     1         (A)  Borough of Carlisle Chapel Hill Storm
     2             Drainage Project                            1,000,000
     3             (Base Project Allocation - $900,000)
     4             (Design and Contingencies - $100,000)
     5         (B)  Lower Allen Township - Highland Park
     6             Drainage Project                            1,240,000
     7         (C)  Hampden Township - Floodproofing
     8             Pinebrook Wastewater Treatment Plant          300,000
     9             (Base Project Allocation - $250,000)
    10             (Design and Contingencies - $50,000)
    11     (iv)  Greene County
    12         (A)  Flood mitigation project in Center
    13             Township                                      157,000
    14         (B)  Flood mitigation project in Jackson
    15             Township                                      188,000
    16         (C)  Flood mitigation project in Perry
    17             Township                                      500,000
    18         (D)  Flood mitigation project in Wayne
    19             Township                                      530,000
    20     (v)  Luzerne County
    21         (A)  Township of Plains, Mill Creek Flood
    22             Protection Project, construction of a
    23             flood protection project along Mill
    24             Creek and its unnamed tributary             1,030,000
    25     (vi)  Montgomery County
    26         (A)  Upper Dublin Township - Construction
    27             and rehabilitation of Ardsley Drainage
    28             Channel                                     1,800,000
    29     (vii)  Schuylkill County
    30         (A)  Flood control project on Wabash Creek,
    19970S0188B0182                 - 63 -

     1             Walker Township and Tamaqua Borough,
     2             involving a tunnel bypass of collapsed
     3             culvert                                    12,100,000
     4             (Base Project Allocation - $11,000,000)
     5             (Design and Contingencies - $1,100,000)
     6     (viii)  York County
     7         (A)  Construction of flood retention
     8             basins, Dallastown Borough and York
     9             Township                                      350,000
    10         (B)  Construction of flood retention
    11             basins, Powder Mill and Tyler Run
    12             Roads                                         505,000
    13  Section 8.  Itemization of Keystone Recreation, Park and
    14                 Conservation Projects.
    15     Projects in the category of Keystone Recreation, Park and
    16  Conservation projects to be constructed by the Department of
    17  Conservation and Natural Resources, its successors or assigns,
    18  and to be financed by the incurring of debt and/or current
    19  revenues, are hereby itemized, together with their respective
    20  estimated costs, as follows:
    21                                                           Total
    22                                                          Project
    23             Project                                    Allocation
    24  (1)  Department of Conservation and Natural
    25     Resources                                          $9,925,000
    26     (i)  Bald Eagle State Park
    27         (A)  Renovation of the sewage treatment
    28             plant and collection system                   600,000
    29     (ii)  Forest District 12
    30         (A)  Rehabilitate 30 miles of Pine Creek
    19970S0188B0182                 - 64 -

     1             Trail                                       1,250,000
     2         (B)  Rehabilitate Colton Point Road             1,200,000
     3     (iii)  Gifford Pinchot State Park
     4         (A)  Renovation of the sewage treatment
     5             plant and collection system                   800,000
     6     (iv)  Kings Gap Environmental Education Center
     7         (A)  Replacement of interior plumbing and
     8             upgrade electrical and heating systems        700,000
     9     (v)  Ryerson Station State Park
    10         (A)  Rehabilitate swimming pool                   700,000
    11     (vi)  Worlds End State Park
    12         (A)  Construct new sewage treatment plant
    13             and collection system                         500,000
    14     (vii)  Lackawanna State Park
    15         (A)  Park improvements                            225,000
    16     (viii)  Thornhurst State Park
    17         (A)  Park improvements                            150,000
    18     (ix)  Allegheny County
    19         (A)  Dormont Borough, Beggs Snyder Park
    20             Improvements                                   50,000
    21     (x)  Bucks County
    22         (A)  Acquisition of 167 acres designated as
    23             a working "historic airfield"               1,500,000
    24     (xi)  Lackawanna County
    25         (A)  Borough of Moosic, park and
    26             playground                                    200,000
    27         (B)  Borough of Moscow, park and
    28             playground                                    100,000
    29         (C)  Greenfield Township, park and
    30             playground                                     50,000
    19970S0188B0182                 - 65 -

     1         (D)  Newton Township, baseball park at
     2             three sites                                   500,000
     3         (E)  Newton Township, park and playground          50,000
     4         (F)  South Abington Township, park and
     5             playground                                    200,000
     6     (xii)  Luzerne County
     7         (A)  Susquehanna River Trail, conversion to
     8             trail of former track of Pocono
     9             Northeast Railway line from City of
    10             Pittston to City of Wilkes-Barre              300,000
    11     (xiii)  Presque Isle State Park
    12         (A)  Office rehabilitation and expansion          850,000
    13  Section 9.  Itemization of Pennsylvania Game Commission Capital
    14                 Projects.
    15     The individual capital projects in the category of public
    16  improvement projects to be acquired by the Pennsylvania Game
    17  Commission and to be financed from current revenues of the Game
    18  Fund pursuant to executive authorizations are hereby itemized,
    19  together with their respective estimated costs, as follows:
    20                                                           Total
    21                                                          Project
    22             Project                                    Allocation
    23  (1)  Pennsylvania Game Commission                     $5,000,000
    24     (i)  Upgrade FM radio system for all western
    25         regions including construction of towers,
    26         shelters and antennae and the acquisition
    27         of microwave equipment, base stations,
    28         consoles and other equipment necessary to
    29         achieve a communication system fully
    30         compatible with future 800 MHz Statewide
    19970S0188B0182                 - 66 -

     1         system                                          5,000,000
     2  Section 10.  Itemization of Pennsylvania Fish and Boat
     3                 Commission Capital Projects.
     4     The individual capital projects in the category of public
     5  improvement projects to be developed by the Pennsylvania Fish
     6  and Boat Commission and to be financed from current revenues of
     7  the Fish Fund and the Boat Fund pursuant to executive
     8  authorizations are hereby itemized, together with their
     9  respective estimated costs, as follows:
    10                                                           Total
    11                                                          Project
    12             Project                                    Allocation
    13  (1)  Pennsylvania Fish and Boat Commission            $6,380,000
    14     (i)  Beaver County
    15         (A)  Development of a boating access area
    16             in Monaca Borough                             200,000
    17             (Base Project Allocation - $200,000)
    18     (ii)  Crawford County
    19         (A)  Acquisition and renovation of a
    20             Northeast Law Enforcement Office and
    21             associated regional Fish and Boat
    22             Commission office facilities and
    23             installation of boat storage, parking
    24             and associated facilities in Vernon
    25             Township                                      180,000
    26             (Base Project Allocation - $180,000)
    27     (iii)  Erie County
    28         (A)  Shades Beach Park Development              6,000,000
    29  Section 11.  Itemization of forestry bridge
    30  projects.
    19970S0188B0182                 - 67 -

     1     Projects in the category of forestry bridge
     2  projects to be constructed by the Department of
     3  Conservation and Natural Resources, its successors
     4  or assigns, and to be financed by oil company
     5  franchise tax revenues pursuant to 75 Pa.C.S. §
     6  9502(a)(2)(iv) (relating to imposition of tax),
     7  are hereby itemized, together with their
     8  respective estimated costs, as follows:
     9                                                           Total
    10                                                          Project
    11             Project                                    Allocation
    12  (1)  Department of Conservation and Natural
    13     Resources                                         $13,514,000
    14     (i)  Adams County
    15         (A)  Replacement of Bridge No.01-0005,
    16             Carbaugh Run Bridge                           250,000
    17     (ii)  Bedford County
    18         (A)  Replacement of Bridge No.02-0002,
    19             Wertz Road Bridge over Cove Creek             100,000
    20     (iii)  Centre County
    21         (A)  Replacement of Bridge No.7-0010,
    22             Siglerville Millheim Pike Bridge              162,000
    23         (B)  Replacement of Bridge No.7-0015, Green
    24             Valley Road Bridge                            260,000
    25         (C)  Replacement of Bridge No.7-0033, Pine
    26             Creek Road Bridge                             386,000
    27         (D)  Replacement of Bridge No.7-0045,
    28             McCall Dam Road Bridge over White Deer
    29             Creek                                         180,000
    30         (E)  Replacement of Bridge No.9-0030, Six
    19970S0188B0182                 - 68 -

     1             Mile Run Bridge                               192,000
     2         (F)  Replacement of Bridge No.10-0028,
     3             State Line Road Bridge                        196,000
     4     (iv)  Clearfield County
     5         (A)  Replacement of Bridge No.9-0005, Tyler
     6             Road Bridge over Laurel Run                   284,000
     7         (B)  Replacement of Bridge No.9-0019,
     8             Dent's Branch Road Bridge                     282,000
     9         (C)  Replacement of Bridge No.9-0022,
    10             Merrill Road Bridge                           197,000
    11     (v)  Clinton County
    12         (A)  Replacement of Bridge No.10-0033,
    13             Cooks Run Road Bridge over Cooks Run          110,000
    14         (B)  Replacement of Bridge No.10-0042, Two
    15             Mile Road Bridge                              100,000
    16         (C)  Replacement of Bridge No.10-0043, Big
    17             Basin Road Bridge over Shintown Run           206,000
    18         (D)  Replacement of Bridge No.10-059,
    19             bridge over right branch of Young
    20             Woman's Creek Road                            287,000
    21         (E)  Replacement of Bridge No.10-0064,
    22             Trout Run Bridge                              255,000
    23         (F)  Replacement of Bridge No.15-0021,
    24             County Line Road Bridge                       167,000
    25     (vi)  Cumberland County
    26         (A)  Replacement of Bridge No.01-0006,
    27             Woodrow Road Run Bridge                       150,000
    28         (B)  Replacement of Bridge No.01-0010,
    29             Milesburn Road Bridge                         102,000
    30     (vii)  Dauphin County
    19970S0188B0182                 - 69 -

     1         (A)  Replacement of large culvert, White
     2             Oak Road Bridge over White Oak Run            100,000
     3     (viii)  Elk County
     4         (A)  Replacement of Bridge No.13-0040, Red
     5             Run Road Bridge                               160,000
     6         (B)  Replacement of Bridge No.13-0049,
     7             Shaffer Draft Road Bridge                     175,000
     8         (C)  Replacement of Bridge No.13-0050, West
     9             Hicks Run Road Bridge                         175,000
    10         (D)  Replacement of Bridge No.13-0052,
    11             bridge over east branch of Hicks Run          175,000
    12         (E)  Replacement of Bridge No.13-0053,
    13             bridge over east branch of Hicks Run          175,000
    14     (ix)  Franklin County
    15         (A)  Replacement of Bridge No.01-0016, Wirt
    16             Road Bridge                                   147,000
    17         (B)  Replacement of Bridge No.01-0022,
    18             Rattlesnake Run Road Bridge                   149,000
    19         (C)  Replacement of Bridge No.01-0021,
    20             Lindsay Lot Road Bridge over Furnace
    21             Run                                           100,000
    22     (x)  Huntingdon County
    23         (A)  Replacement of Bridge No.5-0012,
    24             Colerain Road Bridge                          235,000
    25         (B)  Replacement of Bridge No.5-0014,
    26             Coopers Gap Road Bridge                       160,000
    27         (C)  Replacement of Bridge No.5-0021, Stone
    28             Creek Road Bridge                             182,000
    29         (D)  Replacement of Bridge No.5-0027,
    30             Diamond Valley Road Bridge over Globe
    19970S0188B0182                 - 70 -

     1             Run                                           100,000
     2         (E)  Replacement of Bridge No.5-0028,
     3             Laurel Run Road Bridge                        213,000
     4         (F)  Replacement of Bridge No.5-0051,
     5             Coopers Gap Road Bridge                       174,000
     6     (xi)  Jefferson County
     7         (A)  Replacement of Bridge No.8-0003,
     8             Callen Run Road Bridge over Callen Run        200,000
     9     (xii)  Juniata County
    10         (A)  Replacement of Bridge No.3-0007,
    11             Spectacle Gap Bridge                          158,000
    12     (xiii)  Lycoming County
    13         (A)  Replacement of Bridge No.12-0015, Rock
    14             Run Road Bridge                               175,000
    15         (B)  Replacement of Bridge No.12-0016, Rock
    16             Run Road Bridge                               164,000
    17         (C)  Replacement of Bridge No.12-0019,
    18             Little Bear Bridge                            193,000
    19         (D)  Replacement of Bridge No.12-0020,
    20             Little Bear Bridge                            193,000
    21         (E)  Replacement of Bridge No.12-0021,
    22             Little Bear Bridge                            193,000
    23         (F)  Replacement of Bridge No.12-0022,
    24             Little Bear Creek Road Bridge                 237,000
    25         (G)  Replacement of Bridge No.12-0028,
    26             Fourth Gap Road Bridge                        100,000
    27         (H)  Replacement of large culvert, Frances
    28             Road at Big Hollow                            100,000
    29     (xiv)  Mifflin County
    30         (A)  Replacement of Bridge No.3-0008,
    19970S0188B0182                 - 71 -

     1             Spectacle Gap Road Bridge over East
     2             Licking Creek                                 150,000
     3         (B)  Replacement of Bridge No.7-0004,
     4             Havice Valley Road Bridge over Panther
     5             Run                                           257,000
     6     (xv)  Monroe County
     7         (A)  Replacement of Bridge No.19-0001,
     8             Laurel Run Road Bridge                        159,000
     9     (xvi)  Perry County
    10         (A)  Replacement of Bridge No.3-0010, Elk
    11             Hill Road Bridge                              152,000
    12         (B)  Replacement of Bridge No.3-0011, Elk
    13             Hill Road Bridge                              152,000
    14         (C)  Replacement of Bridge No.3-0014,
    15             Phoenix Bridge, road washout at north
    16             abutment                                      100,000
    17         (D)  Replacement of Bridge No.3-0015,
    18             Sheaffer Run Bridge, undermining at
    19             south abutment                                150,000
    20         (E)  Replacement of Bridge No.3-0016,
    21             Laurel Run Road Bridge                        185,000
    22         (F)  Replacement of Bridge No.3-0018, Twin
    23             Bridge                                        180,000
    24         (G)  Replacement of culvert, Shearer Dug
    25             Box Culvert                                   100,000
    26     (xvii)  Pike County
    27         (A)  Replacement of Bridge No.19-0004, Pine
    28             Flats Run Road Bridge                         160,000
    29     (xviii)  Potter County
    30         (A)  Replacement of Bridge No.15-0013,
    19970S0188B0182                 - 72 -

     1             Windfall Road Bridge                          160,000
     2         (B)  Replacement of Bridge No.15-0015,
     3             Joerg Run Road Bridge                         160,000
     4         (C)  Replacement of Bridge No.15-0018, Lebo
     5             Run Road Bridge                               160,000
     6         (D)  Replacement of Bridge No.15-0020,
     7             Robinson Road Bridge                          230,000
     8         (E)  Replacement of Bridge No.15-0024,
     9             Robinson Road Bridge                          140,000
    10         (F)  Replacement of Bridge No.16-0015,
    11             Butternut Hollow Road Bridge over
    12             Kettle Creek                                  110,000
    13     (xix)  Somerset County
    14         (A)  Replacement of Bridge No.4-0002, Blue
    15             Hole Road Bridge                              192,000
    16         (B)  Replacement of Bridge No.4-0008, Cole
    17             Run Road Bridge                               138,000
    18     (xx)  Sullivan County
    19         (A)  Replacement of Bridge No.20-0002,
    20             Brunnerdale Road Bridge                       220,000
    21         (B)  Replacement of Bridge No.20-0008,
    22             Shanerburg Road Bridge                        212,000
    23         (C)  Replacement of Bridge No.20-0011,
    24             Shanerburg Road Bridge over Shanerburg
    25             Run                                           110,000
    26     (xxi)  Tioga County
    27         (A)  Replacement of Bridge No.16-0004, Left
    28             Asaph Road Bridge                             248,000
    29         (B)  Replacement of Bridge No.16-0005,
    30             Asaph Run Bridge                              414,000
    19970S0188B0182                 - 73 -

     1         (C)  Replacement of Bridge No.16-0010,
     2             Painter Leetonia Road Bridge                  170,000
     3         (D)  Replacement of Bridge No.16-0011,
     4             Cedar Run Bridge                              170,000
     5         (E)  Replacement of Bridge No.16-0020, Mine
     6             Hole Road Bridge                              107,000
     7     (xxii)  Westmoreland County
     8         (A)  Replacement of Bridge No.4-0011, Linn
     9             Run Road Bridge over Linn Run                 125,000
    10     (xxiii)  Union County
    11         (A)  Replacement of Bridge No.7-0016,
    12             Hoofnagle Road Bridge                         235,000
    13         (B)  Replacement of Bridge No.7-0017,
    14             Weikert Run Road Bridge                       235,000
    15         (C)  Replacement of Bridge No.7-0047, White
    16             Deer Creek Road Bridge                        234,000
    17  Section 12.  Limited waiver of local requirements.
    18     (a)  Waivers for current itemizations.--The limitation on
    19  Department of Transportation funding of capital projects under
    20  74 Pa.C.S. § 1302(4) (relating to program authorizations) shall
    21  be totally waived for the capital projects in the category of
    22  transportation assistance projects for mass transit contained in
    23  section 5(a)(9)(ii), (v), (xii) and (xiii), (10)(i), (ii),
    24  (iii), (xiii), (xiv) and (xv) and (14)(i).
    25     (b)  Waiver for 1992 itemization.--
    26         (1)  Notwithstanding any provision to the contrary, there
    27     shall be no local match funding requirement for phases I and
    28     II of the National magnetic levitation prototype proposal and
    29     development, as described in section 5(b)(15)(i)(B) of the
    30     act of December 28, 1992 (P.L.1694, No.188), known as the
    19970S0188B0182                 - 74 -

     1     Capital Budget Project Itemization Act of 1991-1992.
     2         (2)  The Department of Transportation shall select a
     3     contractor for the project described in section
     4     5(b)(15)(i)(B) of the Capital Budget Project Itemization Act
     5     of 1991-1992. Such selection shall be based on the following
     6     criteria; the contractor must have extensive knowledge of
     7     magnetic levitation technology and have been incorporated in
     8     this Commonwealth for at least six years for the express
     9     purpose of developing magnetic levitation technology. The
    10     contractor must also have demonstrated an ability to attract
    11     multimodal private sector investment, including corporate and
    12     labor support, with participation of a major U.S. passenger
    13     airline company. The contractor must also have demonstrated
    14     an ability to obtain Federal, State and local funding for
    15     magnetic levitation development.
    16  Section 13.  Use of existing funds.
    17     (a)  Public improvements.--Of the $1,373,007,000 which is
    18  authorized for the acquisition or construction of public
    19  improvement projects under section 3, the sum of $25,540,000
    20  shall be provided from excess funds available in the unallocated
    21  reserves of the Capital Facilities Fund from previous public
    22  improvement appropriations for projects for additional funding
    23  itemized in section 3.
    24     (b)  Furniture and equipment.--Of the $52,249,000 which is
    25  authorized for the purchase of original movable furniture and
    26  equipment for the projects which are included in section 4, the
    27  sum of $115,000 shall be provided from excess funds available in
    28  the unallocated reserves of the Capital Facilities Fund from
    29  previous furniture and equipment appropriations for projects for
    30  additional funding itemized in section 4.
    19970S0188B0182                 - 75 -

     1  Section 14.  Debt authorization.
     2     (a)  Public improvements.--The Governor, Auditor General and
     3  State Treasurer are hereby authorized and directed to borrow
     4  from time to time in addition to any authorization heretofore or
     5  hereafter enacted, on the credit of the Commonwealth, subject to
     6  the limitations provided in the current capital budget, money
     7  not exceeding in the aggregate the sum of $1,347,467,000 as may
     8  be found necessary to carry out the acquisition and construction
     9  of the public improvement projects specifically itemized in a
    10  capital budget.
    11     (b)  Furniture and equipment.--The Governor, Auditor General
    12  and State Treasurer are hereby authorized and directed to borrow
    13  from time to time in addition to any authorization heretofore or
    14  hereafter enacted, on the credit of the Commonwealth, subject to
    15  the limitations provided in the current capital budget, money
    16  not exceeding in the aggregate the sum of $52,134,000 as may be
    17  found necessary to carry out the public improvement projects
    18  consisting of the acquisition of original movable furniture and
    19  equipment specifically itemized in a capital budget.
    20     (c)  Transportation assistance.--The Governor, Auditor
    21  General and State Treasurer are hereby authorized and directed
    22  to borrow from time to time in addition to any authorization
    23  heretofore or hereafter enacted, on the credit of the
    24  Commonwealth, subject to the limitations provided in the current
    25  capital budget, money not exceeding in the aggregate the sum of
    26  $542,968,000 as may be found necessary to carry out the
    27  acquisition and construction of the transportation assistance
    28  projects specifically itemized in a capital budget.
    29     (d)  Redevelopment assistance.--Subject to the limitation in
    30  section 1616.1-B(b) of the act of April 9, 1929 (P.L.343,
    19970S0188B0182                 - 76 -

     1  No.176), known as The Fiscal Code, the Governor, Auditor General
     2  and State Treasurer are hereby authorized and directed to borrow
     3  from time to time in addition to any authorization heretofore or
     4  hereafter enacted, on the credit of the Commonwealth, subject to
     5  the limitations provided in the current capital budget, money
     6  not exceeding in the aggregate the sum of $921,068,000 as may be
     7  found necessary to carry out the redevelopment assistance and
     8  the redevelopment capital assistance projects specifically
     9  itemized in a capital budget.
    10     (e)  Flood control.--The Governor, Auditor General and State
    11  Treasurer are hereby authorized and directed to borrow from time
    12  to time in addition to any authorization heretofore or hereafter
    13  enacted, on the credit of the Commonwealth, subject to the
    14  limitations provided in the current capital budget, money not
    15  exceeding in the aggregate the sum of $20,456,000 as may be
    16  found necessary to carry out the acquisition and construction of
    17  the flood control projects specifically itemized in a capital
    18  budget.
    19  Section 15.  Issue of bonds.
    20     The indebtedness authorized in this act shall be incurred,
    21  from time to time, and shall be evidenced by one or more series
    22  of general obligation bonds of the Commonwealth in such
    23  aggregate principal amount for each series as the Governor, the
    24  Auditor General and the State Treasurer shall determine, but the
    25  latest stated maturity date shall not exceed the estimated
    26  useful life of the projects being financed as stated in section
    27  16.
    28  Section 16.  Estimated useful life and term of debt.
    29     (a)  Estimated useful life.--The General Assembly states that
    30  the estimated useful life of the public improvement projects
    19970S0188B0182                 - 77 -

     1  itemized in this act is as follows:
     2         (1)  Public improvement projects, 30 years.
     3         (2)  Furniture and equipment projects, 10 years.
     4         (3)  Transportation assistance projects:
     5             (i)  Rolling stock, 15 years.
     6             (ii)  Passenger buses, 12 years.
     7             (iii)  Furniture and equipment, 10 years.
     8             (iv)  All others, 30 years.
     9     (b)  Term of debt.--The maximum term of the debt authorized
    10  to be incurred under this act is 30 years.
    11  Section 17.  Appropriations.
    12     (a)  Public improvements.--The net proceeds of the sale of
    13  the obligations authorized in this act are hereby appropriated
    14  from the Capital Facilities Fund to the Department of General
    15  Services in the maximum amount of $1,347,467,000 to be used by
    16  it exclusively to defray the financial cost of the public
    17  improvement projects specifically itemized in a capital budget.
    18  After reserving or paying the expenses of the sale of the
    19  obligation, the State Treasurer shall pay to the Department of
    20  General Services the moneys as required and certified by it to
    21  be legally due and payable.
    22     (b)  Furniture and equipment.--The net proceeds of the sale
    23  of the obligations authorized in this act are hereby
    24  appropriated from the Capital Facilities Fund to the Department
    25  of General Services in the maximum amount of $52,134,000 to be
    26  used by it exclusively to defray the financial cost of the
    27  public improvement projects consisting of the acquisition of
    28  original movable furniture and equipment specifically itemized
    29  in a capital budget. After reserving or paying the expenses of
    30  the sale of the obligation, the State Treasurer shall pay to the
    19970S0188B0182                 - 78 -

     1  Department of General Services the moneys as required and
     2  certified by it to be legally due and payable.
     3     (c)  Transportation assistance.--The net proceeds of the sale
     4  of the obligations authorized in this act are hereby
     5  appropriated from the Capital Facilities Fund to the Department
     6  of Transportation in the maximum amount of $542,968,000 to be
     7  used by it exclusively to defray the financial cost of the
     8  transportation assistance projects specifically itemized in a
     9  capital budget. After reserving or paying the expense of the
    10  sale of the obligation, the State Treasurer shall pay to the
    11  Department of Transportation the moneys as required and
    12  certified by it to be legally due and payable.
    13     (d)  Redevelopment assistance.--The net proceeds of the sale
    14  of the obligations authorized in this act are hereby
    15  appropriated from the Capital Facilities Fund to the Department
    16  of Community and Economic Development in the maximum amount of
    17  $921,068,000 to be used by it exclusively to defray the
    18  financial cost of the redevelopment assistance and redevelopment
    19  capital assistance projects specifically itemized in a capital
    20  budget. After reserving or paying the expenses of the sale of
    21  the obligation, the State Treasurer shall pay to the Department
    22  of Community and Economic Development the moneys as required and
    23  certified by it to be legally due and payable.
    24     (e)  Flood control.--The net proceeds of the sale of the
    25  obligations authorized in this act are hereby appropriated from
    26  the Capital Facilities Fund to the Department of Environmental
    27  Protection in the maximum amount of $20,456,000 to be used by it
    28  exclusively to defray the financial cost of the flood control
    29  projects specifically itemized in a capital budget. After
    30  reserving or paying the expense of the sale of the obligation,
    19970S0188B0182                 - 79 -

     1  the State Treasurer shall pay to the Department of Environmental
     2  Protection the moneys as required and certified by it to be
     3  legally due and payable.
     4  Section 18.  Federal funds.
     5     In addition to those funds appropriated in section 17, all
     6  moneys received from the Federal Government for the projects
     7  specifically itemized in this act are also hereby appropriated
     8  for those projects.
     9  Section 19.  Prioritization of public improvement projects.
    10     The public improvement projects authorized in this act shall
    11  be prioritized by the Department of General Services in such
    12  manner as to ensure that at least 25% of the total financial
    13  cost of public improvement projects approved for design and/or
    14  construction in any one fiscal year shall be for new
    15  construction projects and at least 25% of the total financial
    16  cost of public improvement projects approved for design and/or
    17  construction in any one fiscal year shall be for the major
    18  renovation and retrofit of existing facilities.
    19  Section 20.  Expiration of authorization and appropriation.
    20     The authorization and appropriation for the additional
    21  capital projects itemized in sections 3, 4, 5, 6 and 7 for which
    22  construction contracts have not been executed within four years
    23  of the effective date of this act shall expire upon such date
    24  and shall be considered repealed. The Secretary of the Budget
    25  may extend an expired project for up to one year upon written
    26  notification of the majority chairman and minority chairman of
    27  the Appropriations Committee of the Senate and the majority
    28  chairman and minority chairman of the Appropriations Committee
    29  of the House of Representatives. Upon expiration of the
    30  extension period, an extended project may not be subsequently
    19970S0188B0182                 - 80 -

     1  extended.
     2  Section 21.  Special contract provisions.
     3     (a)  Abatement of hazardous materials.--Notwithstanding any
     4  provisions of law to the contrary, the Department of General
     5  Services may through a request for proposals award a contract
     6  for the design and administration of the abatement of hazardous
     7  materials from the Transportation and Safety Building, as
     8  itemized in section 3. The contract may be awarded on the basis
     9  of the best interest of the Commonwealth to a responsive and
    10  responsible proposer. Although cost shall be considered as a
    11  factor, it need not be the determining factor.
    12     (b)  Demolition design and administration.--Notwithstanding
    13  any provisions of law to the contrary, the Department of General
    14  Services may through a request for proposals award a contract
    15  for the design and administration of the demolition of the
    16  Transportation and Safety Building, as itemized in section 3.
    17  The contract may be awarded on the basis of the best interest of
    18  the Commonwealth to a responsive and responsible proposer.
    19  Although cost shall be considered a factor, it need not be the
    20  determining factor.
    21     (c)  Construction management services.--The Department of
    22  General Services may, to facilitate project management, conflict
    23  resolution and timely project completion, contract for
    24  construction management services for the abatement of hazardous
    25  materials, demolition and reconstruction of the Transportation
    26  and Safety Building, as itemized in section 3.
    27     (d)  Construction management.--Notwithstanding any provisions
    28  of law to the contrary, the Department of General Services may,
    29  to facilitate project management, conflict resolution and timely
    30  project completion contract for construction management services
    19970S0188B0182                 - 81 -

     1  for the construction of a 500-cell maximum security juvenile
     2  detention facility to be located in Western Pennsylvania, to be
     3  known as the State Correction Facility at Indiana for Juvenile
     4  Offenders, and for the construction of the 1,000-cell medium
     5  security facility in Forest County.
     6  Section 22.  Coordination.
     7     The program provided for in section 3(15)(iv)(A) and (B)
     8  shall be developed in conjunction with the project referenced in
     9  section 5(b)(15)(i)(B) of the act of December 28, 1992
    10  (P.L.1694, No.188), known as the Capital Budget Project
    11  Itemization Act of 1991-1992, subject to the conditions set
    12  forth in the act of July 2, 1993 (P.L.134, No.31), known as the
    13  Capital Budget Act of 1993-1994.
    14  Section 23.  Repeals.
    15     The following acts and parts of acts are repealed:
    16     Section 3(1)(i)(A) and (12)(ii)(A) of the act of July 10,
    17  1986 (P.L.1285, No.118), known as the Capital Budget Project
    18  Itemization Act for 1984-1985.
    19     Section 3(3)(v)(A)(vi) of the act of October 21, 1988
    20  (P.L.851, No.113), known as the Capital Budget Project
    21  Itemization Act for 1987-1988.
    22     Sections 3(4)(ii)(A)(II) and 6(1)(iii)(A) of the act of
    23  December 28, 1992 (P.L.1694, No.188), known as the Capital
    24  Budget Project Itemization Act of 1991-1992.
    25     Sections 3(4)(i)(A) and (ii)(E) and (6)(v)(A) and 7(1)(ii)(A)
    26  and (iv)(A) of the act of July 8, 1994 (P.L.444, No.74), known
    27  as the Capital Budget Project Itemization Act for 1994-1995.
    28     Sections 3(7)(vi)(a) and 5(19)(i)(A) of the act of July 2,
    29  1993 (P.L.265, No.47), known as the Capital Budget Project
    30  Itemization Act for 1993-1994.
    19970S0188B0182                 - 82 -

     1     Section 68(k)(1) of the act of December 12, 1994 (P.L.962,
     2  No.136), known as the First Supplemental Capital Budget Project
     3  Itemization Act of 1994-1995.
     4     Sections 3(1)(v)(A) and (1)(x)(A) of the act of July 6, 1995
     5  (1st Sp.Sess., P.L.1051, No.19), known as the 1995 Special
     6  Session Corrections and Secure Facilities Capital Budget Project
     7  Itemization Act.
     8  Section 24.  Editorial changes.
     9     In editing and preparing this act for printing following the
    10  final enactment, the Legislative Reference Bureau shall insert
    11  or revise letters or numbers for projects where the letters or
    12  numbers are missing or require revision. The bureau shall also
    13  revise the total monetary amounts for the total authorization,
    14  debt authorization, appropriations and departmental totals as
    15  necessary to agree with the total monetary amounts of the
    16  projects.
    17  Section 25.  Effective date.