PRIOR PRINTER'S NO. 2387                      PRINTER'S NO. 2471

THE GENERAL ASSEMBLY OF PENNSYLVANIA


HOUSE BILL

No. 1931 Session of 1995


        INTRODUCED BY DERMODY, MARKOSEK AND DeLUCA, JUNE 29, 1995

        AS REPORTED FROM COMMITTEE ON TRANSPORTATION, HOUSE OF
           REPRESENTATIVES, AS AMENDED, SEPTEMBER 20, 1995

                                  A SUPPLEMENT

     1  To the act of December 8, 1982 (P.L.848, No.235), entitled "An
     2     act providing for the adoption of capital projects related to
     3     the repair, rehabilitation or replacement of highway bridges
     4     to be financed from current revenue or by the incurring of
     5     debt and capital projects related to highway and safety
     6     improvement projects to be financed from current revenue of
     7     the Motor License Fund," itemizing a local bridge project      <--
     8     ADDITIONAL LOCAL AND STATE BRIDGE PROJECTS.                    <--

     9     The General Assembly of the Commonwealth of Pennsylvania
    10  hereby enacts as follows:
    11  Section 1.  Short title.
    12     This act shall be known and may be cited as the Highway-
    13  Railroad and Highway Bridge Capital Budget Supplemental Act for
    14  1995-1996.
    15  Section 2.  Definitions.
    16     The following words and phrases when used in this act shall
    17  have the meanings given to them in this section unless the
    18  context clearly indicates otherwise:
    19     "Account."  The Highway Bridge Improvement Restricted Account
    20  within the Motor License Fund.

     1     "Capital project."  A capital project as defined in section
     2  1602-B of the act of April 9, 1929 (P.L.343, No.176), known as
     3  The Fiscal Code, and shall include a county or municipal bridge
     4  rehabilitation, replacement or improvement project as set forth
     5  in this act.
     6     "Department."  The Department of Transportation of the
     7  Commonwealth.
     8     "Secretary."  The Secretary of Transportation of the
     9  Commonwealth.
    10  Section 3.  Total authorization for bridge projects.
    11     (a)  Total projects.--The total authorization for the costs
    12  of the projects itemized pursuant to this act and to be financed
    13  from current revenue or by the incurring of debt shall be
    14  $630,000 $465,074,000.                                            <--
    15     (b)  State projects.--The authorization for capital projects
    16  in the category of highway projects to be constructed by the
    17  Department of Transportation, its successors or assigns, and to
    18  be financed by the incurring of debt or from the highway
    19  account, itemized in this act under the category of State
    20  bridges, shall be $000,000,000 $333,723,000.                      <--
    21     (c)  Non-State projects.--The authorization for non-State
    22  highway bridge projects to be constructed by municipalities and
    23  to be financed in part with grants not exceeding 80% of the non-
    24  Federal share of the costs made to the local government
    25  municipalities by the department from revenues deposited in the
    26  account itemized in this act under the category of local
    27  bridges, shall be $630,000 $131,351,000.                          <--
    28  Section 4.  Itemization of bridge projects.
    29     The individual capital projects in the category of highway
    30  projects to be constructed by the Department of Transportation,
    19950H1931B2471                  - 2 -

     1  its successors or assigns, and to be financed from current
     2  revenue or by the incurring of debt are hereby itemized,
     3  together with their estimated financial costs, in the following
     4  sections.
     5  Section 5.  Adams County (Reserved).                              <--
     6  SECTION 5.  ADAMS COUNTY.                                         <--
     7     (A)  LOCAL BRIDGES
     8         (1)  CUMBERLAND TOWNSHIP, T-338, HERR'S
     9             RIDGE ROAD BRIDGE OVER WILLOUGHBY RUN,
    10             BRIDGE REHABILITATION                         170,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $100,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $60,000)
    15         (2)  CUMBERLAND TOWNSHIP, T-402, HORNER
    16             ROAD BRIDGE OVER MARSH CREEK, COUNTY
    17             BRIDGE NO.111, BRIDGE REPLACEMENT           1,075,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $725,000)
    20             (LAND ALLOCATION - $25,000)
    21             (DESIGN AND CONTINGENCIES - $325,000)
    22         (3)  CUMBERLAND TOWNSHIP, T-417, GOULDEN
    23             ROAD BRIDGE OVER ROCK CREEK, COUNTY
    24             BRIDGE NO.123, BRIDGE REHABILITATION          330,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $250,000)
    27             (LAND ALLOCATION - $5,000)
    28             (DESIGN AND CONTINGENCIES - $75,000)
    29     (B)  STATE BRIDGES (RESERVED)
    30  Section 6.  Allegheny County.
    19950H1931B2471                  - 3 -

     1     (a)  Local Bridges
     2         (1)  Plum Borough, Mary Street Bridge over
     3             Plum Creek, Bridge Replacement                630,000
     4             (Base Construction Allocation -
     5             $400,000)
     6             (Land Allocation - $50,000)
     7             (Design and Contingencies - $180,000)
     8     (b)  State Bridges (Reserved)                                  <--
     9  Section 7.  Armstrong County (Reserved).
    10  Section 8.  Beaver County (Reserved).
    11  Section 9.  Bedford County (Reserved).
    12  Section 10.  Berks County (Reserved).
    13  Section 11.  Blair County (Reserved).
    14  Section 12.  Bradford County (Reserved).
    15  Section 13.  Bucks County (Reserved).
    16  Section 14.  Butler County (Reserved).
    17  Section 15.  Cambria County (Reserved).
    18  Section 16.  Cameron County (Reserved).
    19  Section 17.  Carbon County (Reserved).
    20  Section 18.  Centre County (Reserved).
    21  Section 19.  Chester County (Reserved).
    22  Section 20.  Clarion County (Reserved).
    23  Section 21.  Clearfield County (Reserved).
    24  Section 22.  Clinton County (Reserved).
    25  Section 23.  Columbia County (Reserved).
    26  Section 24.  Crawford County (Reserved).
    27  Section 25.  Cumberland County (Reserved).
    28  Section 26.  Dauphin County (Reserved).
    29  Section 27.  Delaware County (Reserved).
    30  Section 28.  Elk County (Reserved).
    19950H1931B2471                  - 4 -

     1  Section 29.  Erie County (Reserved).
     2  Section 30.  Fayette County (Reserved).
     3  Section 31.  Forest County (Reserved).
     4  Section 32.  Franklin County (Reserved).
     5  Section 33.  Fulton County (Reserved).
     6  Section 34.  Greene County (Reserved).
     7  Section 35.  Huntingdon County (Reserved).
     8  Section 36.  Indiana County (Reserved).
     9  Section 37.  Jefferson County (Reserved).
    10  Section 38.  Juniata County (Reserved).
    11  Section 39.  Lackawanna County (Reserved).
    12  Section 40.  Lancaster County (Reserved).
    13  Section 41.  Lawrence County (Reserved).
    14  Section 42.  Lebanon County (Reserved).
    15  Section 43.  Lehigh County (Reserved).
    16  Section 44.  Luzerne County (Reserved).
    17  Section 45.  Lycoming County (Reserved).
    18  Section 46.  McKean County (Reserved).
    19  Section 47.  Mercer County (Reserved).
    20  Section 48.  Mifflin County (Reserved).
    21  Section 49.  Monroe County (Reserved).
    22  Section 50.  Montgomery County (Reserved).
    23  Section 51.  Montour County (Reserved).
    24  Section 52.  Northampton County (Reserved).
    25  Section 53.  Northumberland County (Reserved).
    26  Section 54.  Perry County (Reserved).
    27  Section 55.  Philadelphia County (Reserved).
    28  Section 56.  Pike County (Reserved).
    29  Section 57.  Potter County (Reserved).
    30  Section 58.  Schuylkill County (Reserved).
    19950H1931B2471                  - 5 -

     1  Section 59.  Snyder County (Reserved).
     2  Section 60.  Somerset County (Reserved).
     3  Section 61.  Sullivan County (Reserved).
     4  Section 62.  Susquehanna County (Reserved).
     5  Section 63.  Tioga County (Reserved).
     6  Section 64.  Union County (Reserved).
     7  Section 65.  Venango County (Reserved).
     8  Section 66.  Warren County (Reserved).
     9  Section 67.  Washington County (Reserved).
    10  Section 68.  Wayne County (Reserved).
    11  Section 69.  Westmoreland County (Reserved).
    12  Section 70.  Wyoming County (Reserved).
    13  Section 71.  York County (Reserved).
    14         (2)  CITY OF PITTSBURGH, GLENWOOD BRIDGE,                  <--
    15             PHASE II OVER MONONGAHELA RIVER, THREE
    16             RAILROADS AND CARSON STREET, BRIDGE
    17             REHABILITATION                              4,180,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $3,905,000)
    20             (DESIGN AND CONTINGENCIES - $275,000)
    21         (3)  ELIZABETH TOWNSHIP, PATTERSON ROAD,
    22             BOYD HOLLOW BRIDGE, BRIDGE REPLACEMENT        225,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $180,000)
    25             (LAND ALLOCATION - $11,000)
    26             (DESIGN AND CONTINGENCIES - $34,000)
    27         (4)  ELIZABETH TOWNSHIP, YATES STREET
    28             BRIDGE, BRIDGE REPLACEMENT                    198,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $158,000)
    19950H1931B2471                  - 6 -

     1             (LAND ALLOCATION - $10,000)
     2             (DESIGN AND CONTINGENCIES - $30,000)
     3         (5)  SHALER TOWNSHIP, SOUTH OF MARTHA
     4             AVENUE, ANDERSON ROAD OVER WIBLE RUN,
     5             BRIDGE REPLACEMENT                            500,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $400,000)
     8             (DESIGN AND CONTINGENCIES - $100,000)
     9     (B)  STATE BRIDGES
    10         (1)  SR 0028, ETNA BRIDGE, NORTHBOUND
    11             BRIDGE NO.4 TO EXISTING SR 0028, ETNA
    12             BOROUGH, SHALER TOWNSHIP, SHARPSBURG
    13             BOROUGH AND O'HARA TOWNSHIP, BRIDGE
    14             REHABILITATION                              7,415,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $7,115,000)
    17             (LAND ALLOCATION - $300,000)
    18         (2)  SR 0028, ETNA BRIDGE TO 62ND STREET
    19             BRIDGE, ETNA BOROUGH, SHALER TOWNSHIP,
    20             SHARPSBURG BOROUGH AND O'HARA TOWNSHIP,
    21             BRIDGE REHABILITATION                      17,222,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $17,022,000)
    24             (LAND ALLOCATION - $200,000)
    25         (3)  SR 0030, ARDMORE WESTBOUND ELECTRIC
    26             OVER SR 2112, CHALFANT BOROUGH, BRIDGE
    27             REPLACEMENT                                 3,100,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $3,000,000)
    30             (DESIGN AND CONTINGENCIES - $100,000)
    19950H1931B2471                  - 7 -

     1         (4)  SR 0030, ARDMORE EASTBOUND ELECTRIC
     2             OVER SR 2112, CHALFANT BOROUGH, BRIDGE
     3             REPLACEMENT                                 2,500,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $2,400,000)
     6             (DESIGN AND CONTINGENCIES - $100,000)
     7         (5)  SR 0030, ARDMORE BOULEVARD BRIDGE NO.1
     8             OVER FALLS RUN, NORTH OF SR 8012
     9             INTERCHANGE, FOREST HILLS BOROUGH,
    10             BRIDGE REPLACEMENT                            550,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $400,000)
    13             (LAND ALLOCATION - $50,000)
    14             (DESIGN AND CONTINGENCIES - $100,000)
    15         (6)  SR 0048, BOSTON HOLLOW ROAD BRIDGE
    16             OVER UNNAMED STREAM, NORTH OF LINCOLN
    17             BOROUGH, ELIZABETH BOROUGH, BRIDGE
    18             REPLACEMENT                                   340,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $200,000)
    21             (LAND ALLOCATION - $40,000)
    22             (DESIGN AND CONTINGENCIES - $100,000)
    23         (7)  SR 0050, BRIDGE OVER CHARTIERS CREEK,
    24             NORTHBOUND LANE, HEIDELBERG BOROUGH,
    25             SCOTT TOWNSHIP, BRIDGE REHABILITATION       3,750,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $3,300,000)
    28             (LAND ALLOCATION - $50,000)
    29             (DESIGN AND CONTINGENCIES - $400,000)
    30         (8)  SR 0060, SOUTH MAIN STREET BRIDGE OVER
    19950H1931B2471                  - 8 -

     1             SAW MILL RUN, SOUTH OF WEST END CIRCLE,
     2             CITY OF PITTSBURGH, BRIDGE PAINTING           178,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $173,000)
     5             (DESIGN AND CONTINGENCIES - $5,000)
     6         (9)  SR 0130, TRI-BOROUGH EXTENDED BRIDGE
     7             OVER PATTON STREET AT SR 8076
     8             INTERCHANGE, WILMERDING BOROUGH, BRIDGE
     9             REHABILITATION                                505,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $400,000)
    12             (LAND ALLOCATION - $30,000)
    13             (DESIGN AND CONTINGENCIES - $75,000)
    14         (10)  SR 0148, BRIDGE OVER CROOKED RUN
    15             CREEK NEAR SR 2037, WHITE OAK BOROUGH,
    16             BRIDGE REPLACEMENT                            350,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $200,000)
    19             (LAND ALLOCATION - $50,000)
    20             (DESIGN AND CONTINGENCIES - $100,000)
    21         (11)  SR 0791, BRIDGE OVER CHALFONT RUN AT
    22             SR 2048, WILKINS TOWNSHIP, BRIDGE
    23             REPLACEMENT                                   450,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $300,000)
    26             (LAND ALLOCATION - $50,000)
    27             (DESIGN AND CONTINGENCIES - $100,000)
    28         (12)  SR 0837, NORTHBOUND RAMP A TO SR 0885
    29             SOUTHBOUND, CITY OF PITTSBURGH, BRIDGE
    30             REHABILITATION                              1,350,000
    19950H1931B2471                  - 9 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $1,250,000)
     3             (DESIGN AND CONTINGENCIES - $100,000)
     4         (13)  SR 0978, MILLER'S RUN ROAD BRIDGE
     5             OVER DOLPHIN RUN, SOUTH FAYETTE
     6             TOWNSHIP, BRIDGE REPLACEMENT                  300,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $200,000)
     9             (DESIGN AND CONTINGENCIES - $100,000)
    10         (14)  SR 1001, WEST 7TH AVENUE BRIDGE OVER
    11             BULL CREEK, TARENTUM BOROUGH, BRIDGE
    12             REPLACEMENT                                   400,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $300,000)
    15             (DESIGN AND CONTINGENCIES - $100,000)
    16         (15)  SR 1011, GUYS RUN ROAD BRIDGE OVER
    17             GUYS RUN, NORTH OF SR 0028, HARMAR
    18             TOWNSHIP, BRIDGE REPLACEMENT                  350,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $200,000)
    21             (LAND ALLOCATION - $50,000)
    22             (DESIGN AND CONTINGENCIES - $100,000)
    23         (16)  SR 2001, GLASSPORT-ELIZABETH ROAD
    24             BRIDGE OVER BURNS RUN, NORTH OF
    25             ELIZABETH TOWNSHIP, LINCOLN BOROUGH,
    26             BRIDGE REPLACEMENT                            350,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $200,000)
    29             (LAND ALLOCATION - $50,000)
    30             (DESIGN AND CONTINGENCIES - $100,000)
    19950H1931B2471                 - 10 -

     1         (17)  SR 2081, TURTLE CREEK-MONROEVILLE
     2             ROAD OVER US 22 BUSINESS, MONROEVILLE
     3             BOROUGH, BRIDGE REPLACEMENT                 1,060,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $960,000)
     6             (DESIGN AND CONTINGENCIES - $100,000)
     7         (18)  SR 2094, JEROME STREET BRIDGE OVER SR
     8             2027, YOUGHIOGHENY RIVER, MCKEESPORT
     9             BOROUGH, BRIDGE REHABILITATION              4,600,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $4,500,000)
    12             (DESIGN AND CONTINGENCIES - $100,000)
    13         (19)  SR 3066, STEUBENVILLE PIKE BRIDGE
    14             OVER US 22, NORTH FAYETTE TOWNSHIP,
    15             BRIDGE REHABILITATION                         500,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $400,000)
    18             (LAND ALLOCATION - $25,000)
    19             (DESIGN AND CONTINGENCIES - $75,000)
    20         (20)  SR 3069, LIBERTY TUNNEL AIRSHAFT
    21             BETWEEN SR 0051 AND LIBERTY BRIDGE,
    22             CITY OF PITTSBURGH, AIRSHAFT
    23             RESTORATION                                 1,570,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $1,370,000)
    26             (DESIGN AND CONTINGENCIES - $200,000)
    27         (21)  SR 3104, MCKEES ROCKS SIDEWALK OVER
    28             HARRIET STREET, MCKEES ROCKS BOROUGH,
    29             BRIDGE REHABILITATION                       6,800,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19950H1931B2471                 - 11 -

     1             $6,700,000)
     2             (DESIGN AND CONTINGENCIES - $100,000)
     3         (22)  SR 4036, BIG SEWICKLEY CREEK ROAD
     4             OVER BIG SEWICKLEY CREEK AT SR 2003,
     5             BELL ACRES BOROUGH, BRIDGE
     6             REHABILITATION                                500,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $400,000)
     9             (LAND ALLOCATION - $25,000)
    10             (DESIGN AND CONTINGENCIES - $75,000)
    11         (23)  SR 8043, SOUTHBOUND RAMP BRIDGE OVER
    12             SR 0019 AND SR 0065, CITY OF
    13             PITTSBURGH, BRIDGE REHABILITATION           2,400,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $2,100,000)
    16             (LAND ALLOCATION - $50,000)
    17             (DESIGN AND CONTINGENCIES - $250,000)
    18         (24)  SR 8045, RAMP AT STADIUM OVER SR 0065
    19             AND STADIUM DRIVE, CITY OF PITTSBURGH,
    20             BRIDGE REHABILITATION                         600,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $600,000)
    23         (25)  SR 8049, SR 0019 BRIDGE RAMP, CHATEAU
    24             STREET TO SR 0019, CITY OF PITTSBURGH,
    25             BRIDGE REHABILITATION                       2,350,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $2,000,000)
    28             (LAND ALLOCATION - $50,000)
    29             (DESIGN AND CONTINGENCIES - $300,000)
    30         (26)  SR 8049, BRIDGE RAMP FROM SR 0065
    19950H1931B2471                 - 12 -

     1             NORTHBOUND TO SR 0019, CITY OF
     2             PITTSBURGH, BRIDGE REHABILITATION           2,850,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $2,500,000)
     5             (LAND ALLOCATION - $50,000)
     6             (DESIGN AND CONTINGENCIES - $300,000)
     7         (27)  SR 8049, I-279 BRIDGE RAMP TO SR 0065
     8             NORTHBOUND, CITY OF PITTSBURGH, BRIDGE
     9             REHABILITATION                              1,730,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $1,500,000)
    12             (LAND ALLOCATION - $30,000)
    13             (DESIGN AND CONTINGENCIES - $200,000)
    14         (28)  SR 0030, ARDMORE BOULEVARD BRIDGE
    15             NO.2 OVER FALLS RUN, NORTH OF SR 8012
    16             INTERCHANGE, FOREST HILLS BOROUGH,
    17             BRIDGE REPLACEMENT                            550,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $400,000)
    20             (LAND ALLOCATION - $50,000)
    21             (DESIGN AND CONTINGENCIES - $100,000)
    22  SECTION 7.  ARMSTRONG COUNTY.
    23     (A)  LOCAL BRIDGES
    24         (1)  BOGGS TOWNSHIP, T-850, SCRUBGRASS
    25             BRIDGE OVER SCRUBGRASS CREEK, BRIDGE
    26             REHABILITATION                                230,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $170,000)
    29             (LAND ALLOCATION - $10,000)
    30             (DESIGN AND CONTINGENCIES - $50,000)
    19950H1931B2471                 - 13 -

     1         (2)  BOGGS TOWNSHIP, T-632, SCRUBGRASS
     2             BRIDGE NO.2 OVER SCRUBGRASS CREEK,
     3             BRIDGE REHABILITATION                         185,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $150,000)
     6             (LAND ALLOCATION - $10,000)
     7             (DESIGN AND CONTINGENCIES - $25,000)
     8         (3)  BOGGS TOWNSHIP, T-821, PINE CREEK
     9             BRIDGE OVER NORTH FORK OF PINE CREEK,
    10             BRIDGE REHABILITATION                         140,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $100,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $30,000)
    15         (4)  NORTH BUFFALO TOWNSHIP, T-300, BLAINE
    16             BRIDGE OVER BUFFALO CREEK, BRIDGE
    17             REPLACEMENT                                   500,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $400,000)
    20             (LAND ALLOCATION - $20,000)
    21             (DESIGN AND CONTINGENCIES - $80,000)
    22         (5)  NORTH BUFFALO TOWNSHIP, T-414, CHURCH
    23             ROAD BRIDGE OVER STREAM, BRIDGE
    24             REPLACEMENT                                   150,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $100,000)
    27             (LAND ALLOCATION - $10,000)
    28             (DESIGN AND CONTINGENCIES - $40,000)
    29         (6)  WEST KITTANNING BOROUGH, T-759, BRIDGE
    30             OVER STREAM, BRIDGE REPLACEMENT               325,000
    19950H1931B2471                 - 14 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $265,000)
     3             (LAND ALLOCATION - $10,000)
     4             (DESIGN AND CONTINGENCIES - $50,000)
     5     (B)  STATE BRIDGES
     6         (1)  SR 0028, BUFFALO CREEK BRIDGE OVER
     7             BUFFALO CREEK AND CONRAIL, SOUTH
     8             BUFFALO TOWNSHIP, BRIDGE PAINTING           3,010,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $3,000,000)
    11             (DESIGN AND CONTINGENCIES - $10,000)
    12         (2)  SR 3023, IRON BRIDGE ROAD, PINE RUN
    13             BRIDGE REPLACEMENT, SOUTH BUFFALO
    14             TOWNSHIP, BRIDGE REPLACEMENT                  550,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $510,000)
    17             (LAND ALLOCATION - $20,000)
    18             (DESIGN AND CONTINGENCIES - $20,000)
    19  SECTION 8.  BEAVER COUNTY.
    20     (A)  LOCAL BRIDGES
    21         (1)  AMBRIDGE AND ALIQUIPPA BOROUGHS,
    22             AMBRIDGE - ALIQUIPPA BRIDGE OVER OHIO
    23             RIVER, BRIDGE CONSTRUCTION                 38,000,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $30,000,000)
    26             (LAND ALLOCATION - $4,000,000)
    27             (DESIGN AND CONTINGENCIES - $4,000,000)
    28         (2)  VANPORT TOWNSHIP, VANPORT BRIDGE NO.6
    29             OVER TWO MILE RUN, BRIDGE REPLACEMENT         465,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19950H1931B2471                 - 15 -

     1             $375,000)
     2             (LAND ALLOCATION - $10,000)
     3             (DESIGN AND CONTINGENCIES - $80,000)
     4         (3)  VANPORT TOWNSHIP, VANPORT BRIDGE NO.7
     5             OVER TWO MILE RUN, BRIDGE REPLACEMENT         470,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $380,000)
     8             (LAND ALLOCATION - $10,000)
     9             (DESIGN AND CONTINGENCIES - $80,000)
    10         (4)  VANPORT TOWNSHIP, VANPORT BRIDGE NO.8
    11             OVER TWO MILE RUN, BRIDGE REPLACEMENT         510,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $420,000)
    14             (LAND ALLOCATION - $10,000)
    15             (DESIGN AND CONTINGENCIES - $80,000)
    16         (5)  VANPORT TOWNSHIP, VANPORT BRIDGE NO.9
    17             OVER TWO MILE RUN, BRIDGE REPLACEMENT         440,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $350,000)
    20             (LAND ALLOCATION - $10,000)
    21             (DESIGN AND CONTINGENCIES - $80,000)
    22     (B)  STATE BRIDGES
    23         (1)  SR 0051, BRIDGE OVER NEW YORK AVENUE,
    24             RAMP A, ROCHESTER BOROUGH, BRIDGE DECK
    25             REPLACEMENT                                 5,600,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $5,500,000)
    28             (DESIGN AND CONTINGENCIES - $100,000)
    29         (2)  SR 0351, 5TH STREET, KOPPEL-ELLWOOD
    30             BRIDGE OVER BEAVER RIVER, KOPPEL
    19950H1931B2471                 - 16 -

     1             BOROUGH AND NORTH SEWICKLEY TOWNSHIP,
     2             BRIDGE REPLACEMENT, PHASE I                33,500,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $30,000,000)
     5             (LAND ALLOCATION - $1,000,000)
     6             (DESIGN AND CONTINGENCIES - $2,500,000)
     7         (3)  SR 1014, WISE'S GROVE ROAD BRIDGE OVER
     8             BRUSH CREEK, MARION TOWNSHIP, BRIDGE
     9             REHABILITATION                                750,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $600,000)
    12             (LAND ALLOCATION - $50,000)
    13             (DESIGN AND CONTINGENCIES - $100,000)
    14         (4)  SR 1022, 13TH STREET BRIDGE OVER
    15             BLOCKHOUSE RUN AT PULASKI COUNTY LINE,
    16             NEW BRIGHTON BOROUGH, BRIDGE
    17             REPLACEMENT                                   780,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $480,000)
    20             (LAND ALLOCATION - $50,000)
    21             (DESIGN AND CONTINGENCIES - $250,000)
    22         (5)  SR 4032, ENGLE ROAD BRIDGE OVER SIX
    23             MILE RUN CREEK, INDUSTRY BOROUGH,
    24             BRIDGE REPLACEMENT                            350,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $200,000)
    27             (LAND ALLOCATION - $50,000)
    28             (DESIGN AND CONTINGENCIES - $100,000)
    29         (6)  SR 4033, WILDWOOD ROAD BRIDGE OVER
    30             BRADY'S RUN, PATTERSON TOWNSHIP, BRIDGE
    19950H1931B2471                 - 17 -

     1             REPLACEMENT                                   400,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $250,000)
     4             (LAND ALLOCATION - $50,000)
     5             (DESIGN AND CONTINGENCIES - $100,000)
     6         (7)  SR 8035, RAMP A AT LR 641 OVER SLOPE,
     7             ROCHESTER BOROUGH, BRIDGE
     8             REHABILITATION                              1,200,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $1,000,000)
    11             (LAND ALLOCATION - $50,000)
    12             (DESIGN AND CONTINGENCIES - $150,000)
    13         (8)  SR 8037, RAMP F OVER TR 51 AND TR 65
    14             NORTHBOUND, ROCHESTER BOROUGH, BRIDGE
    15             REPLACEMENT                                   550,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $400,000)
    18             (LAND ALLOCATION - $50,000)
    19             (DESIGN AND CONTINGENCIES - $100,000)
    20         (9)  SR 8039, RAMP AD, SR 0168 OVER TR 51,
    21             BRIDGEWATER BOROUGH, BRIDGE
    22             REHABILITATION                                700,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $550,000)
    25             (LAND ALLOCATION - $50,000)
    26             (DESIGN AND CONTINGENCIES - $100,000)
    27  SECTION 9.  BEDFORD COUNTY.
    28     (A)  LOCAL BRIDGES
    29         (1)  BROAD TOP TOWNSHIP, T-550, MOSQUITO
    30             BRIDGE OVER SIX MILE RUN, BRIDGE
    19950H1931B2471                 - 18 -

     1             REPLACEMENT                                   505,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $400,000)
     4             (LAND ALLOCATION - $10,000)
     5             (DESIGN AND CONTINGENCIES - $95,000)
     6         (2)  BROAD TOP TOWNSHIP, T-553, LANGDONDALE
     7             BRIDGE OVER SANDY RUN, BRIDGE
     8             REPLACEMENT                                   395,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $300,000)
    11             (LAND ALLOCATION - $10,000)
    12             (DESIGN AND CONTINGENCIES - $85,000)
    13         (3)  BROAD TOP TOWNSHIP, T-583, LONGS RUN
    14             BRIDGE OVER LONGS RUN, BRIDGE
    15             REPLACEMENT                                   395,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $300,000)
    18             (LAND ALLOCATION - $10,000)
    19             (DESIGN AND CONTINGENCIES - $85,000)
    20         (4)  HARRISON TOWNSHIP, T-418, TURNER
    21             COVERED BRIDGE OVER JUNIATA RIVER,
    22             BRIDGE REHABILITATION                         825,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $700,000)
    25             (LAND ALLOCATION - $25,000)
    26             (DESIGN AND CONTINGENCIES - $100,000)
    27         (5)  MONROE TOWNSHIP, T-354, SIDELING HILL
    28             OVER EAST BRANCH SIDELING HILL CREEK,
    29             BRIDGE REPLACEMENT                            335,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19950H1931B2471                 - 19 -

     1             $250,000)
     2             (LAND ALLOCATION - $10,000)
     3             (DESIGN AND CONTINGENCIES - $75,000)
     4     (B)  STATE BRIDGES
     5         (1)  SR 0220, US 220, NORTHBOUND BRIDGE
     6             OVER PENNSYLVANIA TURNPIKE, BEDFORD
     7             TOWNSHIP, BRIDGE PAINTING                     180,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $150,000)
    10             (DESIGN AND CONTINGENCIES - $30,000)
    11         (2)  SR 0220, US 220, SOUTHBOUND BRIDGE
    12             OVER PENNSYLVANIA TURNPIKE, BEDFORD
    13             TOWNSHIP, BRIDGE PAINTING                     170,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $140,000)
    16             (DESIGN AND CONTINGENCIES - $30,000)
    17  SECTION 10.  (RESERVED).
    18  SECTION 11.  BLAIR COUNTY.
    19     (A)  LOCAL BRIDGES
    20         (1)  ANTIS TOWNSHIP, T-490, BECKER ROAD
    21             BRIDGE OVER TRIBUTARY OF LITTLE JUNIATA
    22             RIVER, BRIDGE REPLACEMENT                     310,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $250,000)
    25             (LAND ALLOCATION - $10,000)
    26             (DESIGN AND CONTINGENCIES - $50,000)
    27         (2)  TAYLOR TOWNSHIP, T-332, HALTER CREEK
    28             BRIDGE OVER HALTER CREEK, BRIDGE
    29             REPLACEMENT                                   395,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19950H1931B2471                 - 20 -

     1             $300,000)
     2             (LAND ALLOCATION - $10,000)
     3             (DESIGN AND CONTINGENCIES - $85,000)
     4     (B)  STATE BRIDGES
     5         (1)  SR 0022, CANAL PARK BRIDGES OVER THE
     6             JUNIATA RIVER, HOLLIDAYSBURG BOROUGH,
     7             BRIDGE REPLACEMENT                          3,000,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $2,000,000)
    10             (LAND ALLOCATION - $650,000)
    11             (DESIGN AND CONTINGENCIES - $350,000)
    12  SECTION 12.  BRADFORD COUNTY.
    13     (A)  LOCAL BRIDGES (RESERVED)
    14     (B)  STATE BRIDGES
    15         (1)  SR 0006, NORTH BRIDGE OVER SUGAR
    16             CREEK, SOUTH OF LONGS POND ROAD, BRIDGE
    17             REPLACEMENT                                 1,139,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $911,000)
    20             (LAND ALLOCATION - $57,000)
    21             (DESIGN AND CONTINGENCIES - $171,000)
    22         (2)  SR 0409, BILLING CREEK BRIDGE, VILLAGE
    23             OF CAMPTOWN, BRIDGE REPLACEMENT               318,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $254,000)
    26             (LAND ALLOCATION - $16,000)
    27             (DESIGN AND CONTINGENCIES - $48,000)
    28         (3)  SR 3029, TOWANDA CREEK BRIDGES BETWEEN
    29             T-327 AND T-326 ON GULF ROAD, VILLAGE
    30             OF GRANVILLE CENTER, BRIDGE
    19950H1931B2471                 - 21 -

     1             REPLACEMENT                                   593,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $474,000)
     4             (LAND ALLOCATION - $30,000)
     5             (DESIGN AND CONTINGENCIES - $89,000)
     6         (4)  SR 4008, BRIDGE OVER TRIBUTARY OF
     7             SUGAR CREEK, COLUMBIA TOWNSHIP, BRIDGE
     8             REPLACEMENT                                   298,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $238,000)
    11             (LAND ALLOCATION - $15,000)
    12             (DESIGN AND CONTINGENCIES - $45,000)
    13         (5)  SR 0414, BRIDGE OVER TOWANDA CREEK,
    14             BRADFORD BOROUGH, BRIDGE PAINTING             195,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $185,000)
    17             (DESIGN AND CONTINGENCIES - $10,000)
    18  SECTION 13.  BUCKS COUNTY.
    19     (A)  LOCAL BRIDGES
    20         (1)  SPRINGFIELD TOWNSHIP, I-479, BRIDGE
    21             STREET BRIDGE OVER COOKS CREEK, BRIDGE
    22             REPLACEMENT                                   500,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $365,000)
    25             (LAND ALLOCATION - $35,000)
    26             (DESIGN AND CONTINGENCIES - $100,000)
    27     (B)  STATE BRIDGES
    28         (1)  SR 0032, RIVER ROAD AT FLEECYDALE OVER
    29             PAUNACUSSING CREEK, SOLEBURY TOWNSHIP,
    30             BRIDGE REPLACEMENT                          1,400,000
    19950H1931B2471                 - 22 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $1,200,000)
     3             (DESIGN AND CONTINGENCIES - $200,000)
     4         (2)  SR 2002, OTTER STREET BRIDGE OVER
     5             OTTER CREEK, BRISTOL BOROUGH, BRIDGE
     6             REPLACEMENT                                 1,150,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $900,000)
     9             (LAND ALLOCATION - $50,000)
    10             (DESIGN AND CONTINGENCIES - $200,000)
    11         (3)  SR 2025, BRISTOL ROAD BRIDGE OVER
    12             LITTLE NESHAMINY CREEK, WARWICK
    13             TOWNSHIP, BRIDGE REPLACEMENT                1,120,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $900,000)
    16             (LAND ALLOCATION - $80,000)
    17             (DESIGN AND CONTINGENCIES - $140,000)
    18         (4)  SR 2047, HULMEVILLE AVENUE BRIDGE OVER
    19             CONRAIL, MIDDLETOWN, BRIDGE
    20             REPLACEMENT                                 5,600,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $4,000,000)
    23             (LAND ALLOCATION - $800,000)
    24             (DESIGN AND CONTINGENCIES - $800,000)
    25         (5)  SR 4033, UPPER RIDGE ROAD BRIDGE OVER
    26             UNAMI CREEK, MILFORD TOWNSHIP, BRIDGE
    27             REPLACEMENT                                 2,000,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $1,600,000)
    30             (LAND ALLOCATION - $100,000)
    19950H1931B2471                 - 23 -

     1             (DESIGN AND CONTINGENCIES - $300,000)
     2         (6)  SR 4091, KELLERS CHURCH ROAD BRIDGE
     3             OVER DEEP RUN, BEDMINSTER, BRIDGE
     4             REPLACEMENT                                 2,000,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $1,500,000)
     7             (LAND ALLOCATION - $150,000)
     8             (DESIGN AND CONTINGENCIES - $350,000)
     9         (7)  SR 0202, DOYLESTOWN BYPASS (FIVE
    10             BRIDGES) OVER SR 0611, DOYLESTOWN
    11             TOWNSHIP, BRIDGE REHABILITATIONS            2,200,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $2,000,000)
    14             (LAND ALLOCATION - $50,000)
    15             (DESIGN AND CONTINGENCIES - $150,000)
    16         (8)  SR 0611, EASTON ROAD (TWO BRIDGES)
    17             OVER TOHICKON AND DEEP RUN CREEKS,
    18             BEDMINISTER TOWNSHIP, BRIDGE
    19             REPLACEMENTS                                1,650,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $1,500,000)
    22             (LAND ALLOCATION - $50,000)
    23             (DESIGN AND CONTINGENCIES - $100,000)
    24         (9)  SR 2089, ALMSHOUSE ROAD BRIDGE OVER
    25             NESHAMINY CREEK, DOYLESTOWN TOWNSHIP,
    26             BRIDGE REPLACEMENT                          1,800,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $1,500,000)
    29             (LAND ALLOCATION - $150,000)
    30             (DESIGN AND CONTINGENCIES - $150,000)
    19950H1931B2471                 - 24 -

     1  SECTION 14.  BUTLER COUNTY.
     2     (A)  LOCAL BRIDGES
     3         (1)  MUDDY CREEK AND WORTH TOWNSHIPS, T-
     4             348, MUDDY CREEK BRIDGE OVER MUDDY
     5             CREEK, BRIDGE REPLACEMENT                     730,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $550,000)
     8             (LAND ALLOCATION - $15,000)
     9             (DESIGN AND CONTINGENCIES - $165,000)
    10     (B)  STATE BRIDGES
    11         (1)  SR 0228, HOUSEVILLE BRIDGE OVER B&LE
    12             RAILROAD, CLINTON TOWNSHIP, BRIDGE DECK
    13             REPLACEMENT                                   636,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $600,000)
    16             (DESIGN AND CONTINGENCIES - $36,000)
    17  SECTION 15.  (RESERVED).
    18  SECTION 16.  (RESERVED).
    19  SECTION 17.  (RESERVED).
    20  SECTION 18.  CENTRE COUNTY.
    21     (A)  LOCAL BRIDGES (RESERVED)
    22     (B)  STATE BRIDGES
    23         (1)  SR 0080, I-80 VIADUCT OVER MOSHAMON
    24             CREEK AND CONRAIL, RUSH TOWNSHIP,
    25             BRIDGE REHABILITATION                      14,510,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $13,210,000)
    28             (DESIGN AND CONTINGENCIES - $1,300,000)
    29         (2)  SR 1002, MARSH CREEK BRIDGE OVER MARSH
    30             CREEK, BOGGS TOWNSHIP, BRIDGE
    19950H1931B2471                 - 25 -

     1             REPLACEMENT                                   760,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $630,000)
     4             (LAND ALLOCATION - $20,000)
     5             (DESIGN AND CONTINGENCIES - $110,000)
     6         (3)  SR 1002, LITTLE MARSH CREEK BRIDGE
     7             OVER LITTLE MARSH CREEK, CURTIN
     8             TOWNSHIP, BRIDGE REPLACEMENT                  700,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $600,000)
    11             (LAND ALLOCATION - $20,000)
    12             (DESIGN AND CONTINGENCIES - $80,000)
    13         (4)  SR 2012, PENNS CREEK BRIDGE NORTHWEST
    14             OF THE VILLAGE OF SPRING MILLS, GREGG
    15             TOWNSHIP, BRIDGE REPLACEMENT                  470,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $360,000)
    18             (LAND ALLOCATION - $20,000)
    19             (DESIGN AND CONTINGENCIES - $90,000)
    20  SECTION 19.  CHESTER COUNTY.
    21     (A)  LOCAL BRIDGES
    22         (1)  PARKESBURG BOROUGH, STATE STREET
    23             PEDESTRIAN BRIDGE OVER AMTRAK, BRIDGE
    24             REPLACEMENT                                 1,700,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $1,000,000)
    27             (LAND ALLOCATION - $500,000)
    28             (DESIGN AND CONTINGENCIES - $200,000)
    29         (2)  EAST FALLOWFIELD TOWNSHIP, T-362,
    30             TIMACUIA ROAD UNDER PENN CENTRAL
    19950H1931B2471                 - 26 -

     1             RAILROAD, BRIDGE REMOVAL                      445,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $400,000)
     4             (LAND ALLOCATION - $30,000)
     5             (DESIGN AND CONTINGENCIES - $15,000)
     6         (3)  EAST MARLBOROUGH TOWNSHIP, T-402,
     7             COUNTY BRIDGE NO.65, MILL ROAD BRIDGE
     8             OVER WEST BRANCH OF RED CLAY CREEK,
     9             BRIDGE REPLACEMENT                            345,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $291,000)
    12             (LAND ALLOCATION - $25,000)
    13             (DESIGN AND CONTINGENCIES - $29,000)
    14         (4)  OXFORD BOROUGH, BROAD STREET BRIDGE
    15             OVER SEPTA, BRIDGE REPLACEMENT              1,304,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $1,125,000)
    18             (LAND ALLOCATION - $20,000)
    19             (DESIGN AND CONTINGENCIES - $159,000)
    20         (5)  PENN TOWNSHIP, COUNTY BRIDGE NO.260,
    21             POSEY MILL ROAD BRIDGE OVER BIG ELK
    22             CREEK, BRIDGE REPLACEMENT                     425,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $300,000)
    25             (LAND ALLOCATION - $25,000)
    26             (DESIGN AND CONTINGENCIES - $100,000)
    27         (6)  TREDYFFRIN TOWNSHIP, OLD LANCASTER
    28             PIKE BRIDGE OVER AMTRAK, BRIDGE
    29             REHABILITATION                                465,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19950H1931B2471                 - 27 -

     1             $400,000)
     2             (LAND ALLOCATION - $30,000)
     3             (DESIGN AND CONTINGENCIES - $35,000)
     4         (7)  TREDYFFRIN TOWNSHIP, T-807, EVANS ROAD
     5             BRIDGE OVER CONRAIL, BRIDGE
     6             REPLACEMENT                                   195,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $150,000)
     9             (LAND ALLOCATION - $30,000)
    10             (DESIGN AND CONTINGENCIES - $15,000)
    11         (8)  WEST CALN AND WEST BRANDYWINE
    12             TOWNSHIPS, COUNTY BRIDGE NO.283, REID
    13             ROAD BRIDGE OVER WEST BRANCH OF
    14             BRANDYWINE CREEK, BRIDGE REPLACEMENT          740,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $600,000)
    17             (LAND ALLOCATION - $40,000)
    18             (DESIGN AND CONTINGENCIES - $100,000)
    19         (9)  WEST GOSHEN TOWNSHIP, T-210, OLD
    20             EACHUS MILL ROAD BRIDGE OVER SEPTA,
    21             BRIDGE REPLACEMENT                            615,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $500,000)
    24             (LAND ALLOCATION - $15,000)
    25             (DESIGN AND CONTINGENCIES - $100,000)
    26         (10)  WEST GOSHEN TOWNSHIP, T-328, BRIDGE
    27             OVER PENN CENTRAL RAILROAD, BRIDGE
    28             REMOVAL                                       132,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $110,000)
    19950H1931B2471                 - 28 -

     1             (LAND ALLOCATION - $5,000)
     2             (DESIGN AND CONTINGENCIES - $17,000)
     3         (11)  WEST MARLBOROUGH TOWNSHIP, T-368,
     4             CREEK ROAD BRIDGE UNDER PENN CENTRAL
     5             RAILROAD, BRIDGE REMOVAL                      580,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $500,000)
     8             (LAND ALLOCATION - $5,000)
     9             (DESIGN AND CONTINGENCIES - $75,000)
    10     (B)  STATE BRIDGES
    11         (1)  SR 1010, SWEDESFORD ROAD BRIDGE OVER
    12             US 422, DRUMMERS LANE AND WARNER ROAD,
    13             TREDYFFRIN, CHESTER COUNTY, UPPER
    14             MERION, MONTGOMERY COUNTY, BRIDGE
    15             REPLACEMENT                                 6,795,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $6,210,000)
    18             (LAND ALLOCATION - $180,000)
    19             (DESIGN AND CONTINGENCIES - $405,000)
    20         (2)  SR 1045, HARES HILL ROAD BRIDGE OVER
    21             FRENCH CREEK, EAST PIKELAND TOWNSHIP,
    22             BRIDGE REHABILITATION                       1,000,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $740,000)
    25             (LAND ALLOCATION - $60,000)
    26             (DESIGN AND CONTINGENCIES - $200,000)
    27         (3)  SR 3014, LEES ROAD BRIDGE OVER BLACK
    28             RUN, WEST NOTTINGHAM TOWNSHIP, BRIDGE
    29             REPLACEMENT                                 1,125,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19950H1931B2471                 - 29 -

     1             $850,000)
     2             (LAND ALLOCATION - $75,000)
     3             (DESIGN AND CONTINGENCIES - $200,000)
     4         (4)  SR 3030, STREET ROAD BRIDGE OVER
     5             OCTORARO CREEK, UPPER OXFORD TOWNSHIP,
     6             BRIDGE REPLACEMENT                          1,875,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $1,600,000)
     9             (LAND ALLOCATION - $75,000)
    10             (DESIGN AND CONTINGENCIES - $200,000)
    11         (5)  SR 0003, GAY STREET BRIDGE OVER
    12             ABANDONED CONRAIL, WEST CHESTER
    13             BOROUGH, BRIDGE REMOVAL                       180,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $150,000)
    16             (LAND ALLOCATION - $10,000)
    17             (DESIGN AND CONTINGENCIES - $20,000)
    18         (6)  SR 0842, SHAWS BRIDGES (TWO BRIDGES)
    19             OVER BRANCH OF BRANDYWINE CREEK, EAST
    20             BRADFORD AND POCOPSON TOWNSHIPS, BRIDGE
    21             REPLACEMENT                                 1,500,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $1,288,000)
    24             (LAND ALLOCATION - $100,000)
    25             (DESIGN AND CONTINGENCIES - $112,000)
    26         (7)  SR 0842, BRIDGE ROAD BRIDGE OVER EAST
    27             BRANCH OF BRANDYWINE CREEK, EAST
    28             BRADFORD TOWNSHIP, BRIDGE PAINTING            214,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $186,000)
    19950H1931B2471                 - 30 -

     1             (DESIGN AND CONTINGENCIES - $28,000)
     2         (8)  SR 1049, RAPP'S DAM COVERED BRIDGE,
     3             EAST PIKELAND TOWNSHIP, BRIDGE
     4             PAINTING                                       47,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $41,000)
     7             (DESIGN AND CONTINGENCIES - $6,000)
     8         (9)  SR 2011, PHOENIXVILLE PIKE BRIDGE
     9             UNDER ABANDONED PENN CENTRAL RAILROAD,
    10             WEST GOSHEN TOWNSHIP, BRIDGE REMOVAL          125,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $100,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $15,000)
    15         (10)  SR 2018, GREEN HILL ROAD BRIDGE UNDER
    16             ABANDONED PENN CENTRAL RAILROAD, WEST
    17             GOSHEN TOWNSHIP, BRIDGE REMOVAL               125,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $100,000)
    20             (LAND ALLOCATION - $10,000)
    21             (DESIGN AND CONTINGENCIES - $15,000)
    22         (11)  SR 3045, SPRINGDELL ROAD BRIDGE UNDER
    23             ABANDONED PENN CENTRAL RAILROAD, WEST
    24             MARBOROUGH TOWNSHIP, BRIDGE REMOVAL           125,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $100,000)
    27             (LAND ALLOCATION - $10,000)
    28             (DESIGN AND CONTINGENCIES - $15,000)
    29         (12)  SR 3049, HILLTOP VIEW ROAD BRIDGE
    30             OVER BUCK AND DOE RUN CREEK, NEWLIN
    19950H1931B2471                 - 31 -

     1             TOWNSHIP, BRIDGE REPLACEMENT                1,450,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $1,300,000)
     4             (LAND ALLOCATION - $50,000)
     5             (DESIGN AND CONTINGENCIES - $100,000)
     6  SECTION 20.  CLARION COUNTY.
     7     (A)  LOCAL BRIDGES
     8         (1)  BEAVER TOWNSHIP, T-400, CANOE CREEK
     9             BRIDGE OVER CANOE CREEK, BRIDGE
    10             REPLACEMENT                                   380,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $300,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $70,000)
    15         (2)  BEAVER TOWNSHIP, T-422, DEER CREEK
    16             BRIDGE OVER DEER CREEK, BRIDGE
    17             REPLACEMENT                                   540,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $450,000)
    20             (LAND ALLOCATION - $30,000)
    21             (DESIGN AND CONTINGENCIES - $60,000)
    22         (3)  CLARION AND MILLCREEK TOWNSHIPS, T-
    23             490, MILL CREEK BRIDGE OVER MILL CREEK,
    24             BRIDGE REPLACEMENT                            540,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $450,000)
    27             (LAND ALLOCATION - $10,000)
    28             (DESIGN AND CONTINGENCIES - $80,000)
    29         (4)  ELK TOWNSHIP, T-424, DEER CREEK BRIDGE
    30             OVER DEER CREEK, BRIDGE REPLACEMENT           545,000
    19950H1931B2471                 - 32 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $425,000)
     3             (LAND ALLOCATION - $20,000)
     4             (DESIGN AND CONTINGENCIES - $100,000)
     5         (5)  FARMINGTON TOWNSHIP, T-562, WALLEY RUN
     6             BRIDGE OVER WALLEY RUN, BRIDGE
     7             REPLACEMENT                                   375,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $300,000)
    10             (LAND ALLOCATION - $5,000)
    11             (DESIGN AND CONTINGENCIES - $70,000)
    12         (6)  KNOX TOWNSHIP, T-850, TOBY CREEK
    13             BRIDGE OVER TOBY CREEK, BRIDGE
    14             REPLACEMENT                                   480,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $400,000)
    17             (LAND ALLOCATION - $20,000)
    18             (DESIGN AND CONTINGENCIES - $60,000)
    19         (7)  KNOX TOWNSHIP, T-600, LICKING CREEK
    20             BRIDGE OVER LICKING CREEK, BRIDGE
    21             REPLACEMENT                                   445,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $350,000)
    24             (LAND ALLOCATION - $15,000)
    25             (DESIGN AND CONTINGENCIES - $80,000)
    26         (8)  MADISON TOWNSHIP, T-460, RED BANK
    27             CREEK BRIDGE OVER TRIBUTARY OF RED BANK
    28             CREEK, BRIDGE REPLACEMENT                     390,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $300,000)
    19950H1931B2471                 - 33 -

     1             (LAND ALLOCATION - $20,000)
     2             (DESIGN AND CONTINGENCIES - $70,000)
     3         (9)  PORTER TOWNSHIP, T-462, FIDDLERS RUN
     4             BRIDGE OVER FIDDLERS RUN, BRIDGE
     5             REPLACEMENT                                   390,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $300,000)
     8             (LAND ALLOCATION - $10,000)
     9             (DESIGN AND CONTINGENCIES - $80,000)
    10         (10)  PORTER TOWNSHIP, T-472, LEATHERWOOD
    11             CREEK BRIDGE OVER LEATHERWOOD CREEK,
    12             BRIDGE REPLACEMENT                            455,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $375,000)
    15             (LAND ALLOCATION - $20,000)
    16             (DESIGN AND CONTINGENCIES - $60,000)
    17         (11)  PORTER TOWNSHIP, T-750, LEISURE RUN
    18             BRIDGE OVER LEISURE RUN, BRIDGE
    19             REPLACEMENT                                   390,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $300,000)
    22             (LAND ALLOCATION - $10,000)
    23             (DESIGN AND CONTINGENCIES - $80,000)
    24         (12)  RED BANK TOWNSHIP, T-840, BEAVER
    25             CREEK BRIDGE OVER BEAVER CREEK, BRIDGE
    26             REPLACEMENT                                   420,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $350,000)
    29             (LAND ALLOCATION - $15,000)
    30             (DESIGN AND CONTINGENCIES - $55,000)
    19950H1931B2471                 - 34 -

     1         (13)  RED BANK TOWNSHIP, T-508, COUNTY
     2             BRIDGE NO.46, PINE CREEK BRIDGE OVER
     3             PINE CREEK, BRIDGE REPLACEMENT                378,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $300,000)
     6             (LAND ALLOCATION - $8,000)
     7             (DESIGN AND CONTINGENCIES - $70,000)
     8         (14)  RICHLAND TOWNSHIP, T-382, TURKEY RUN
     9             BRIDGE OVER TURKEY RUN, BRIDGE
    10             REPLACEMENT                                   360,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $300,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $50,000)
    15         (15)  RICHLAND TOWNSHIP, T-382, TURKEY RUN
    16             BRIDGE OVER TURKEY RUN, BRIDGE
    17             REPLACEMENT                                   360,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $300,000)
    20             (LAND ALLOCATION - $10,000)
    21             (DESIGN AND CONTINGENCIES - $50,000)
    22         (16)  SLIGO BOROUGH, MADISON STREET BRIDGE
    23             OVER LITTLE LICKING CREEK, BRIDGE
    24             REPLACEMENT                                   445,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $350,000)
    27             (LAND ALLOCATION - $15,000)
    28             (DESIGN AND CONTINGENCIES - $80,000)
    29     (B)  STATE BRIDGES (RESERVED)
    30  SECTION 21.  CLEARFIELD COUNTY.
    19950H1931B2471                 - 35 -

     1     (A)  LOCAL BRIDGES (RESERVED)
     2     (B)  STATE BRIDGES
     3         (1)  SR 2014, COAL RUN BRIDGE OVER COAL
     4             RUN, DECATUR TOWNSHIP, BRIDGE
     5             REPLACEMENT                                   632,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $512,000)
     8             (LAND ALLOCATION - $30,000)
     9             (DESIGN AND CONTINGENCIES - $90,000)
    10         (2)  SR 0879, BRIDGE OVER US 322 NEAR
    11             CLEARFIELD MALL, LAWRENCE TOWNSHIP,
    12             BRIDGE PAINTING                               644,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $614,000)
    15             (DESIGN AND CONTINGENCIES - $30,000)
    16  SECTION 22.  CLINTON COUNTY.
    17     (A)  LOCAL BRIDGES (RESERVED)
    18     (B)  STATE BRIDGES
    19         (1)  SR 0044, BRIDGE OVER SR 0220, 1 MILE
    20             NORTHEAST OF AVIS, PINE CREEK TOWNSHIP,
    21             BRIDGE PAINTING                               580,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $525,000)
    24             (DESIGN AND CONTINGENCIES - $55,000)
    25         (2)  SR 0080, LAMAR INTERCHANGE (TWO
    26             BRIDGES) OVER PA 64 AT EXIT 25, PORTER
    27             TOWNSHIP, BRIDGE REHABILITATION             4,100,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $3,400,000)
    30             (DESIGN AND CONTINGENCIES - $700,000)
    19950H1931B2471                 - 36 -

     1         (3)  SR 0144, BRIDGE OVER KETTLE CREEK, 1
     2             MILE EAST OF HAMMERSLEY FORK, LEIDY
     3             TOWNSHIP, BRIDGE PAINTING                     660,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $600,000)
     6             (DESIGN AND CONTINGENCIES - $60,000)
     7  SECTION 23.  COLUMBIA COUNTY.
     8     (A)  LOCAL BRIDGES (RESERVED)
     9     (B)  STATE BRIDGES
    10         (1)  SR 0044, CHILLISQUAQUE CREEK BRIDGE
    11             OVER CHILLISQUAQUE CREEK, 3 MILES
    12             NORTHWEST OF JERSEYTOWN, BRIDGE
    13             REPLACEMENT                                   477,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $382,000)
    16             (LAND ALLOCATION - $24,000)
    17             (DESIGN AND CONTINGENCIES - $71,000)
    18         (2)  SR 0093, BRIDGE OVER NORTH BRANCH OF
    19             BRIAR CREEK, BRIDGE REPLACEMENT               350,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $275,000)
    22             (LAND ALLOCATION - $15,000)
    23             (DESIGN AND CONTINGENCIES - $60,000)
    24         (3)  SR 0093, BRIAR CREEK BRIDGE OVER BRIAR
    25             CREEK, 3 MILES WEST OF BERWICK, BRIDGE
    26             REPLACEMENT                                   392,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $315,000)
    29             (LAND ALLOCATION - $18,000)
    30             (DESIGN AND CONTINGENCIES - $59,000)
    19950H1931B2471                 - 37 -

     1         (4)  SR 0239, WEST CREEK BRIDGE OVER WEST
     2             CREEK, SOUTHEAST OF BENTON AND
     3             SUGARLOAF TOWNSHIPS, BRIDGE
     4             REPLACEMENT                                   670,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $536,000)
     7             (LAND ALLOCATION - $34,000)
     8             (DESIGN AND CONTINGENCIES - $100,000)
     9         (5)  SR 0442, WEST BRANCH RUN BRIDGE OVER
    10             WEST BRANCH RUN, 1.5 MILES NORTH OF
    11             IOLA, BRIDGE REPLACEMENT                      206,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $165,000)
    14             (LAND ALLOCATION - $10,000)
    15             (DESIGN AND CONTINGENCIES - $31,000)
    16         (6)  SR 1004, ERIE-LACKAWANNA RAILROAD
    17             BRIDGE, VIADUCT OVER CONRAIL, SOUTH
    18             CENTRE TOWNSHIP, BRIDGE REPLACEMENT         1,900,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $1,600,000)
    21             (LAND ALLOCATION - $110,000)
    22             (DESIGN AND CONTINGENCIES - $190,000)
    23         (7)  SR 1019, BRIAR CREEK BRIDGE OVER BRIAR
    24             CREEK, BRIAR CREEK TOWNSHIP, BRIDGE
    25             REPLACEMENT                                   404,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $323,000)
    28             (LAND ALLOCATION - $20,000)
    29             (DESIGN AND CONTINGENCIES - $61,000)
    30         (8)  SR 4012, LITTLE HEMLOCK CREEK BRIDGE
    19950H1931B2471                 - 38 -

     1             OVER LITTLE HEMLOCK CREEK, 10 MILES
     2             SOUTHEAST OF JERSEYTOWN, BRIDGE
     3             REPLACEMENT                                   284,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $227,000)
     6             (LAND ALLOCATION - $14,000)
     7             (DESIGN AND CONTINGENCIES - $43,000)
     8         (9)  SR 4037, MUD RUN BRIDGE OVER MUD RUN,
     9             5 MILES NORTHWEST OF MILLVILLE BOROUGH,
    10             BRIDGE REPLACEMENT                            307,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $246,000)
    13             (LAND ALLOCATION - $15,000)
    14             (DESIGN AND CONTINGENCIES - $46,000)
    15         (10)  SR 0011, BRIDGE OVER FISHING CREEK,
    16             BRIDGE PAINTING                               530,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $520,000)
    19             (DESIGN AND CONTINGENCIES - $10,000)
    20         (11)  SR 1022, BRIDGE OVER FISHING CREEK,
    21             BRIDGE PAINTING                               380,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $370,000)
    24             (DESIGN AND CONTINGENCIES - $10,000)
    25         (12)  SR 1022, BRIDGE OVER OLD CHANNEL,
    26             BRIDGE PAINTING                               125,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $115,000)
    29             (DESIGN AND CONTINGENCIES - $10,000)
    30         (13)  SR 4009, BRIDGE OVER FISHING CREEK,
    19950H1931B2471                 - 39 -

     1             BRIDGE PAINTING                               315,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $305,000)
     4             (DESIGN AND CONTINGENCIES - $10,000)
     5  SECTION 24.  (RESERVED).
     6  SECTION 25.  (RESERVED).
     7  SECTION 26.  DAUPHIN COUNTY.
     8     (A)  LOCAL BRIDGES
     9         (1)  CITY OF HARRISBURG, MULBERRY STREET
    10             RAMP TO CAMERON STREET, BRIDGE
    11             REHABILITATION                                108,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $73,000)
    14             (LAND ALLOCATION - $10,000)
    15             (DESIGN AND CONTINGENCIES - $ 25,000)
    16         (2)  CITY OF HARRISBURG, MACLAY STREET
    17             BRIDGE OVER RAILROAD, BRIDGE
    18             REHABILITATION                                218,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $183,000)
    21             (LAND ALLOCATION - $10,000)
    22             (DESIGN AND CONTINGENCIES - $25,000)
    23         (3)  MIFFLIN TOWNSHIP, T-631, REITZ ROAD
    24             BRIDGE OVER LITTLE WICONISCO CREEK,
    25             COUNTY BRIDGE NO.24, BRIDGE
    26             REPLACEMENT                                   290,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $200,000)
    29             (LAND ALLOCATION - $10,000)
    30             (DESIGN AND CONTINGENCIES - $80,000)
    19950H1931B2471                 - 40 -

     1         (4)  MIFFLIN TOWNSHIP, T-556, KESSLER ROAD
     2             BRIDGE OVER LITTLE WICONISCO CREEK,
     3             BRIDGE REPLACEMENT                            235,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $150,000)
     6             (LAND ALLOCATION - $10,000)
     7             (DESIGN AND CONTINGENCIES - $75,000)
     8         (5)  WASHINGTON TOWNSHIP, BOLTS ROAD BRIDGE
     9             OVER WICONISCO CREEK, BRIDGE
    10             REHABILITATION                                469,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $374,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $85,000)
    15         (6)  WAYNE TOWNSHIP, T-496, LEBO ROAD
    16             BRIDGE OVER POWELL CREEK, BRIDGE
    17             REHABILITATION                                263,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $168,000)
    20             (LAND ALLOCATION - $10,000)
    21             (DESIGN AND CONTINGENCIES - $85,000)
    22     (B)  STATE BRIDGES (RESERVED)
    23  SECTION 27.  DELAWARE COUNTY.
    24     (A)  LOCAL BRIDGES
    25         (1)  CITY OF CHESTER, WEST 7TH STREET,
    26             COUNTY BRIDGE NO.186 OVER CHESTER
    27             CREEK, BRIDGE REPLACEMENT                   1,630,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $1,470,000)
    30             (LAND ALLOCATION - $10,000)
    19950H1931B2471                 - 41 -

     1             (DESIGN AND CONTINGENCIES - $150,000)
     2     (B)  STATE BRIDGES
     3         (1)  SR 0030, PEDESTRIAN TUNNEL UNDER SR
     4             0030 AND ITHAN AVENUE AT VILLANOVA
     5             UNIVERSITY,
     6             RADNOR TOWNSHIP, PEDESTRIAN FACILITIES      7,360,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $6,500,000)
     9             (LAND ALLOCATION - $650,000)
    10             (DESIGN AND CONTINGENCIES - $210,000)
    11         (2)  SR 1015, DARBY-PAOLI ROAD BRIDGE OVER
    12             BRANCH OF LITTLE DARBY CREEK, RADNOR
    13             TOWNSHIP, BRIDGE REPLACEMENT                1,000,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $760,000)
    16             (LAND ALLOCATION - $40,000)
    17             (DESIGN AND CONTINGENCIES - $200,000)
    18         (3)  SR 0291, 4TH STREET BRIDGE OVER RIDLEY
    19             CREEK, CHESTER TOWNSHIP, BRIDGE
    20             PAINTING                                      291,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $253,000)
    23             (DESIGN AND CONTINGENCIES - $38,000)
    24         (4)  SR 0291, ESSINGTON AVENUE BRIDGE OVER
    25             DARBY CREEK, RIDLEY TOWNSHIP, BRIDGE
    26             PAINTING                                      546,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $487,000)
    29             (DESIGN AND CONTINGENCIES - $59,000)
    30         (5)  SR 1019, CONESTOGA ROAD BRIDGE OVER
    19950H1931B2471                 - 42 -

     1             PENNDOT RAILROAD RIGHT-OF-WAY, RADNOR
     2             TOWNSHIP, BRIDGE REMOVAL                      125,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $100,000)
     5             (LAND ALLOCATION - $10,000)
     6             (DESIGN AND CONTINGENCIES - $15,000)
     7         (6)  SR 3019, ROSEVALLY ROAD BRIDGE OVER
     8             SEPTA, UPPER PROVIDENCE TOWNSHIP,
     9             BRIDGE REPLACEMENT                            875,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $700,000)
    12             (LAND ALLOCATION - $100,000)
    13             (DESIGN AND CONTINGENCIES - $75,000)
    14  SECTION 28.  ELK COUNTY.
    15     (A)  LOCAL BRIDGES
    16         (1)  VILLAGE OF WILCOX, T-631, BRIDGE OVER
    17             CLARION RIVER, BRIDGE REPLACEMENT           1,100,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $850,000)
    20             (LAND ALLOCATION - $50,000)
    21             (DESIGN AND CONTINGENCIES - $200,000)
    22     (B)  STATE BRIDGES (RESERVED)
    23  SECTION 29.  ERIE COUNTY.
    24     (A)  LOCAL BRIDGES
    25         (1)  GIRARD TOWNSHIP, BECKMAN BRIDGE OVER
    26             I-90, BRIDGE PAINTING                         200,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $200,000)
    29         (2)  MILLCREEK TOWNSHIP, T-707, ZIMMERLY
    30             ROAD BRIDGE OVER I-79, NEW 2-LANE
    19950H1931B2471                 - 43 -

     1             BRIDGE CONSTRUCTION, NEW BRIDGE             2,150,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $1,900,000)
     4             (LAND ALLOCATION - $50,000)
     5             (DESIGN AND CONTINGENCIES - $200,000)
     6     (B)  STATE BRIDGES (RESERVED)
     7  SECTION 30.  FAYETTE COUNTY.
     8     (A)  LOCAL BRIDGES
     9         (1)  BROWNSVILLE TOWNSHIP, LYNN RUN ROAD
    10             BRIDGE OVER REDSTONE CREEK, BRIDGE
    11             REPLACEMENT                                   200,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $130,000)
    14             (LAND ALLOCATION - $10,000)
    15             (DESIGN AND CONTINGENCIES - $60,000)
    16         (2)  DUNBAR TOWNSHIP, FALLS AVENUE BRIDGE
    17             OVER POSSUM RUN, BRIDGE REPLACEMENT           450,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $350,000)
    20             (LAND ALLOCATION - $15,000)
    21             (DESIGN AND CONTINGENCIES - $85,000)
    22         (3)  GEORGES TOWNSHIP, COUNTY BRIDGE NO.162
    23             OVER MOUNTAIN CREEK, BRIDGE
    24             REPLACEMENT                                   370,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $300,000)
    27             (LAND ALLOCATION - $5,000)
    28             (DESIGN AND CONTINGENCIES - $65,000)
    29         (4)  GERMAN TOWNSHIP, FOOTEDALE BRIDGE
    30             NO.66 OVER DUNLAP CREEK, BRIDGE
    19950H1931B2471                 - 44 -

     1             REPLACEMENT                                   415,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $330,000)
     4             (LAND ALLOCATION - $10,000)
     5             (DESIGN AND CONTINGENCIES - $75,000)
     6         (5)  GERMAN TOWNSHIP, COUNTY BRIDGE NO.54
     7             OVER BROWNS RUN, BRIDGE REPLACEMENT           430,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $355,000)
    10             (LAND ALLOCATION - $5,000)
    11             (DESIGN AND CONTINGENCIES - $70,000)
    12         (6)  GERMAN TOWNSHIP, LECKRONE BRIDGE NO.54
    13             OVER BROWNS RUN, BRIDGE REPLACEMENT           430,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $350,000)
    16             (LAND ALLOCATION - $5,000)
    17             (DESIGN AND CONTINGENCIES - $75,000)
    18         (7)  MENALLEN TOWNSHIP, T-509, BRIDGE OVER
    19             BRANCH OF DUNLAP CREEK, BRIDGE
    20             REPLACEMENT                                   165,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $110,000)
    23             (LAND ALLOCATION - $5,000)
    24             (DESIGN AND CONTINGENCIES - $50,000)
    25         (8)  MENALLEN TOWNSHIP, FAN HALLOW ROAD
    26             BRIDGE OVER FANS RUN, BRIDGE
    27             REPLACEMENT                                   145,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $90,000)
    30             (LAND ALLOCATION - $5,000)
    19950H1931B2471                 - 45 -

     1             (DESIGN AND CONTINGENCIES - $50,000)
     2         (9)  MENALLEN AND NORTH UNION TOWNSHIPS,
     3             FAN HOLLOW BRIDGE NO.184 OVER JENNINGS
     4             RUN, BRIDGE REPLACEMENT                       440,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $350,000)
     7             (LAND ALLOCATION - $10,000)
     8             (DESIGN AND CONTINGENCIES - $80,000)
     9         (10)  NICHOLSON TOWNSHIP, COUNTY BRIDGE
    10             NO.29 OVER YORK RUN, BRIDGE
    11             REPLACEMENT                                   360,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $295,000)
    14             (LAND ALLOCATION - $5,000)
    15             (DESIGN AND CONTINGENCIES - $60,000)
    16         (11)  REDSTONE TOWNSHIP, MERRITTSTOWN
    17             BRIDGE NO.147 OVER DUNLAP CREEK, BRIDGE
    18             REPLACEMENT                                   435,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $350,000)
    21             (LAND ALLOCATION - $10,000)
    22             (DESIGN AND CONTINGENCIES - $75,000)
    23         (12)  SOUTH UNION TOWNSHIP, LEITH BRIDGE
    24             NO.41 OVER REDSTONE CREEK, BRIDGE
    25             REPLACEMENT                                   450,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $360,000)
    28             (LAND ALLOCATION - $10,000)
    29             (DESIGN AND CONTINGENCIES - $80,000)
    30         (13)  STEWARD TOWNSHIP, MEADOW RUN BRIDGE
    19950H1931B2471                 - 46 -

     1             NO.82 OVER MEADOW RUN, BRIDGE
     2             REPLACEMENT                                   450,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $360,000)
     5             (LAND ALLOCATION - $10,000)
     6             (DESIGN AND CONTINGENCIES - $80,000)
     7     (B)  STATE BRIDGES
     8         (1)  SR 0021, MASONTOWN BRIDGE OVER
     9             MONONGAHELA RIVER, RAILROAD AND PRIVATE
    10             ROAD, GERMAN TOWNSHIP, BRIDGE PAINTING      1,500,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $1,500,000)
    13         (2)  SR 0031, JACOBS CREEK BRIDGE OVER
    14             BRANCH OF JACOBS CREEK, BULLSKIN
    15             TOWNSHIP, BRIDGE REPLACEMENT                  290,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $180,000)
    18             (LAND ALLOCATION - $35,000)
    19             (DESIGN AND CONTINGENCIES - $75,000)
    20         (3)  SR 0119, MEMORIAL BRIDGE OVER
    21             YOUGHIOGHENY RIVER, CONNELLSVILLE
    22             BOROUGH, BRIDGE PAINTING                      100,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $100,000)
    25         (4)  SR 0201, FURNACE RUN BRIDGE OVER
    26             FURNACE RUN, FRANKLIN TOWNSHIP, BRIDGE
    27             REPLACEMENT                                   445,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $245,000)
    30             (LAND ALLOCATION - $25,000)
    19950H1931B2471                 - 47 -

     1             (DESIGN AND CONTINGENCIES - $175,000)
     2         (5)  SR 0711, CRAWFORD AVENUE BRIDGE OVER
     3             YOUGHIOGHENY RIVER, CONNELLSVILLE
     4             BOROUGH, BRIDGE PAINTING                      100,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $100,000)
     7         (6)  SR 0982, JACOBS CREEK BRIDGE OVER
     8             BRANCH OF JACOBS CREEK, BULLSKIN
     9             TOWNSHIP, BRIDGE REPLACEMENT                  335,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $225,000)
    12             (LAND ALLOCATION - $35,000)
    13             (DESIGN AND CONTINGENCIES - $75,000)
    14         (7)  SR 0982, BRIDGE OVER MOUNTS CREEK,
    15             BULLSKIN TOWNSHIP, BRIDGE PAINTING            105,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $105,000)
    18         (8)  SR 1051, MOUNTS CREEK BRIDGE OVER
    19             MOUNTS CREEK, BULLSKIN TOWNSHIP, BRIDGE
    20             REPLACEMENT                                   436,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $236,000)
    23             (LAND ALLOCATION - $25,000)
    24             (DESIGN AND CONTINGENCIES - $175,000)
    25         (9)  SR 3013, BROWNS RUN BRIDGE OVER BROWNS
    26             RUN, GERMAN TOWNSHIP, BRIDGE
    27             REPLACEMENT                                   631,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $431,000)
    30             (LAND ALLOCATION - $25,000)
    19950H1931B2471                 - 48 -

     1             (DESIGN AND CONTINGENCIES - $175,000)
     2         (10)  SR 3015, MUDDY RUN BRIDGE OVER MUDDY
     3             RUN, GEORGES TOWNSHIP, BRIDGE PAINTING         33,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $33,000)
     6         (11)  SR 4038, WASHINGTON RUN BRIDGE OVER
     7             WASHINGTON RUN, PERRY TOWNSHIP, BRIDGE
     8             REPLACEMENT                                   640,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $440,000)
    11             (LAND ALLOCATION - $25,000)
    12             (DESIGN AND CONTINGENCIES - $175,000)
    13  SECTION 31.  (RESERVED).
    14  SECTION 32.  FRANKLIN COUNTY.
    15     (A)  LOCAL BRIDGES (RESERVED)
    16     (B)  STATE BRIDGES
    17         (1)  SR 3012, SOCIAL ISLAND ROAD BRIDGE
    18             OVER CONOCOCHEAGUE CREEK, HAMILTON
    19             TOWNSHIP, BRIDGE REPLACEMENT                  786,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $636,000)
    22             (LAND ALLOCATION - $95,000)
    23             (DESIGN AND CONTINGENCIES - $55,000)
    24  SECTION 33.  (RESERVED).
    25  SECTION 34.  GREENE COUNTY.
    26     (A)  LOCAL BRIDGES
    27         (1)  MORGAN TOWNSHIP, COUNTY BRIDGE NO.89
    28             OVER BROWNS RUN, BRIDGE REPLACEMENT           286,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $166,000)
    19950H1931B2471                 - 49 -

     1             (LAND ALLOCATION - $20,000)
     2             (DESIGN AND CONTINGENCIES - $100,000)
     3         (2)  MORGAN TOWNSHIP, COUNTY BRIDGE NO.90
     4             OVER BROWNS RUN, BRIDGE REPLACEMENT           282,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $162,000)
     7             (LAND ALLOCATION - $20,000)
     8             (DESIGN AND CONTINGENCIES - $100,000)
     9         (3)  MORGAN TOWNSHIP, COUNTY BRIDGE NO.91
    10             OVER BROWNS RUN, BRIDGE REPLACEMENT           273,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $153,000)
    13             (LAND ALLOCATION - $20,000)
    14             (DESIGN AND CONTINGENCIES - $100,000)
    15     (B)  STATE BRIDGES
    16         (1)  SR 0018, BRIDGE OVER SOUTH FORK OF TEN
    17             MILE CREEK, FRANKLIN TOWNSHIP, BRIDGE
    18             REHABILITATION                                320,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $280,000)
    21             (DESIGN AND CONTINGENCIES - $40,000)
    22         (2)  SR 0018, BATES CREEK BRIDGE OVER BATES
    23             FORK AND BROWNS CREEKS, WASHINGTON
    24             TOWNSHIP, BRIDGE REPLACEMENT                  650,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $450,000)
    27             (LAND ALLOCATION - $25,000)
    28             (DESIGN AND CONTINGENCIES - $175,000)
    29         (3)  SR 0021, GRINNAGE RUN BRIDGE OVER
    30             GRINNAGE RUN, GRAY TOWNSHIP, BRIDGE
    19950H1931B2471                 - 50 -

     1             REPLACEMENT                                   453,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $253,000)
     4             (LAND ALLOCATION - $25,000)
     5             (DESIGN AND CONTINGENCIES - $175,000)
     6         (4)  SR 0079, I-79 BRIDGE OVER T-631,
     7             WASHINGTON TOWNSHIP, BRIDGE
     8             REPLACEMENT                                   980,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $740,000)
    11             (LAND ALLOCATION - $40,000)
    12             (DESIGN AND CONTINGENCIES - $200,000)
    13         (5)  SR 0079, I-79 BRIDGE OVER T-631,
    14             WASHINGTON TOWNSHIP, BRIDGE
    15             REHABILITATION                                945,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $705,000)
    18             (LAND ALLOCATION - $40,000)
    19             (DESIGN AND CONTINGENCIES - $200,000)
    20         (6)  SR 0079, I-79 BRIDGE OVER PA 221,
    21             WASHINGTON TOWNSHIP, BRIDGE
    22             REPLACEMENT                                 2,074,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $1,784,000)
    25             (LAND ALLOCATION - $40,000)
    26             (DESIGN AND CONTINGENCIES - $250,000)
    27         (7)  SR 0079, I-79 BRIDGE NO.2 OVER PA 221,
    28             WASHINGTON TOWNSHIP, BRIDGE
    29             REPLACEMENT                                 2,074,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19950H1931B2471                 - 51 -

     1             $1,784,000)
     2             (LAND ALLOCATION - $40,000)
     3             (DESIGN AND CONTINGENCIES - $250,000)
     4         (8)  SR 0079, I-79 BRIDGE OVER T-512,
     5             WASHINGTON TOWNSHIP, BRIDGE
     6             REHABILITATION                                980,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $740,000)
     9             (LAND ALLOCATION - $40,000)
    10             (DESIGN AND CONTINGENCIES - $200,000)
    11         (9)  SR 0079, I-79 BRIDGE NO.2 OVER T-512,
    12             WASHINGTON TOWNSHIP, BRIDGE
    13             REPLACEMENT                                 1,020,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $780,000)
    16             (LAND ALLOCATION - $40,000)
    17             (DESIGN AND CONTINGENCIES - $200,000)
    18         (10)  SR 0088, ALBERT GALLATIN BRIDGE OVER
    19             MONONGAHELA RIVER, DUNKARD TOWNSHIP,
    20             BRIDGE PAINTING                             1,500,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $1,500,000)
    23         (11)  SR 0088, POINT MARION BRIDGE OVER
    24             MONONGAHELA RIVER, DUNKARD TOWNSHIP,
    25             BRIDGE REPLACEMENT                          6,200,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $5,500,000)
    28             (LAND ALLOCATION - $200,000)
    29             (DESIGN AND CONTINGENCIES - $500,000)
    30         (12)  SR 0218, ROBERTS RUN BRIDGE NO.2 OVER
    19950H1931B2471                 - 52 -

     1             ROBERTS RUN, WAYNE TOWNSHIP, BRIDGE
     2             REPLACEMENT                                   768,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $568,000)
     5             (LAND ALLOCATION - $25,000)
     6             (DESIGN AND CONTINGENCIES - $175,000)
     7         (13)  SR 2003, BRIDGE OVER BRANCH OF
     8             DUNKARD CREEK, PERRY TOWNSHIP, BRIDGE
     9             REPLACEMENT                                   625,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $400,000)
    12             (LAND ALLOCATION - $25,000)
    13             (DESIGN AND CONTINGENCIES - $200,000)
    14         (14)  SR 3007, BRIDGE OVER BRANCH OF
    15             WHEELING CREEK, RICHILL TOWNSHIP,
    16             BRIDGE REPLACEMENT                            375,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $175,000)
    19             (LAND ALLOCATION - $25,000)
    20             (DESIGN AND CONTINGENCIES - $175,000)
    21  SECTION 35.  HUNTINGDON COUNTY.
    22     (A)  LOCAL BRIDGES
    23         (1)  MILL CREEK BOROUGH, MAIN STREET BRIDGE
    24             OVER MILL CREEK, BRIDGE REHABILITATION         30,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $30,000)
    27         (2)  JUNIATA TOWNSHIP, T-428, CORBIN BRIDGE
    28             OVER RAYSTOWN BRANCH OF JUNIATA RIVER,
    29             BRIDGE REPLACEMENT                            920,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19950H1931B2471                 - 53 -

     1             $920,000)
     2     (B)  STATE BRIDGES (RESERVED)
     3  SECTION 36.  INDIANA COUNTY.
     4     (A)  LOCAL BRIDGES
     5         (1)  BANKS TOWNSHIP, T-974, COUNTY BRIDGE
     6             NO.13, BEAR RUN BRIDGE OVER BEAR RUN,
     7             BRIDGE REPLACEMENT                            500,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $400,000)
    10             (LAND ALLOCATION - $20,000)
    11             (DESIGN AND CONTINGENCIES - $80,000)
    12         (2)  BLACKLICK TOWNSHIP, T-574, MUDDY RUN
    13             BRIDGE OVER MUDDY RUN, BRIDGE
    14             REPLACEMENT                                   380,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $300,000)
    17             (LAND ALLOCATION - $10,000)
    18             (DESIGN AND CONTINGENCIES - $70,000)
    19         (3)  CHERRYHILL TOWNSHIP, T-686, COUNTY
    20             BRIDGE NO.65, GRACE CHURCH BRIDGE OVER
    21             TWO LICK CREEK, BRIDGE REPLACEMENT            600,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $500,000)
    24             (LAND ALLOCATION - $20,000)
    25             (DESIGN AND CONTINGENCIES - $80,000)
    26         (4)  CHERRYHILL TOWNSHIP, T-978, ALLEN
    27             BRIDGE OVER TWO LICK RESERVOIR, BRIDGE
    28             REHABILITATION                                264,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $200,000)
    19950H1931B2471                 - 54 -

     1             (LAND ALLOCATION - $10,000)
     2             (DESIGN AND CONTINGENCIES - $54,000)
     3         (5)  RAYNE TOWNSHIP, T-760, COUNTY BRIDGE
     4             NO.23-A, CHAMBERSVILLE BRIDGE OVER
     5             CROOKED CREEK, BRIDGE REHABILITATION          190,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $150,000)
     8             (LAND ALLOCATION - $10,000)
     9             (DESIGN AND CONTINGENCIES - $30,000)
    10     (B)  STATE BRIDGES (RESERVED)
    11  SECTION 37.  JEFFERSON COUNTY.
    12     (A)  LOCAL BRIDGES
    13         (1)  SUMMERVILLE BOROUGH, COUNTY BRIDGE 40-
    14             A, ANDERSON ROAD BRIDGE OVER RUNAWAY
    15             RUN, BRIDGE REHABILITATION                    415,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $345,000)
    18             (LAND ALLOCATION - $10,000)
    19             (DESIGN AND CONTINGENCIES - $60,000)
    20         (2)  SYKESVILLE BOROUGH, STATION STREET
    21             BRIDGE OVER STUMP CREEK, BRIDGE
    22             REPLACEMENT                                   570,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $500,000)
    25             (LAND ALLOCATION - $10,000)
    26             (DESIGN AND CONTINGENCIES - $60,000)
    27     (B)  STATE BRIDGES
    28         (1)  SR 3033, T-830, KNOX NO.1 BRIDGE OVER
    29             SWAMP RUN, KNOX TOWNSHIP, BRIDGE
    30             REPLACEMENT                                   446,000
    19950H1931B2471                 - 55 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $376,000)
     3             (LAND ALLOCATION - $10,000)
     4             (DESIGN AND CONTINGENCIES - $60,000)
     5  SECTION 38.  JUNIATA COUNTY.
     6     (A)  LOCAL BRIDGES (RESERVED)
     7     (B)  STATE BRIDGES
     8         (1)  SR 0850, LAUREL RUN BRIDGE OVER LAUREL
     9             RUN, VILLAGE OF HONEY GROVE, TUSCARORA
    10             TOWNSHIP, BRIDGE REPLACEMENT                  670,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $500,000)
    13             (LAND ALLOCATION - $20,000)
    14             (DESIGN AND CONTINGENCIES - $150,000)
    15  SECTION 39.  LACKAWANNA COUNTY.
    16     (A)  LOCAL BRIDGES
    17         (1)  MAYFIELD BOROUGH, POPLAR STREET BRIDGE
    18             NO.1 AT JUNCTION OF SOUTH WASHINGTON
    19             AVENUE, BRIDGE REHABILITATION                 150,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $130,000)
    22             (DESIGN AND CONTINGENCIES - $20,000)
    23     (B)  STATE BRIDGES
    24         (1)  SR 1016, HILL STREET BRIDGE OVER
    25             LACKAWANNA RIVER, JESSUP AND BLAKELY
    26             BOROUGHS, BRIDGE DECK REHABILITATION          890,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $800,000)
    29             (LAND ALLOCATION - $10,000)
    30             (DESIGN AND CONTINGENCIES - $80,000)
    19950H1931B2471                 - 56 -

     1         (2)  SR 3011, KEYSER AVENUE BRIDGE OVER
     2             LINDY CREEK, CITY OF SCRANTON, BRIDGE
     3             REPLACEMENT                                   185,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $100,000)
     6             (LAND ALLOCATION - $10,000)
     7             (DESIGN AND CONTINGENCIES - $75,000)
     8         (3)  SR 0171, BRIDGE OVER ELK CREEK AT
     9             JUNCTION OF SR 1011, FELL TOWNSHIP,
    10             BRIDGE REPLACEMENT                            660,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $520,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $130,000)
    15         (4)  SR 0247, BRIDGE OVER SOUTH BRANCH OF
    16             TUNKHANNOCK CREEK, NORTH OF TR 438,
    17             SCOTT TOWNSHIP, BRIDGE REPLACEMENT            426,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $330,000)
    20             (LAND ALLOCATION - $10,000)
    21             (DESIGN AND CONTINGENCIES - $86,000)
    22         (5)  SR 2003, BRIDGE OVER WALLENPAUPACK
    23             CREEK, NORTH OF TR 348, JEFFERSON
    24             TOWNSHIP, BRIDGE REPLACEMENT                  355,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $275,000)
    27             (LAND ALLOCATION - $10,000)
    28             (DESIGN AND CONTINGENCIES - $70,000)
    29         (6)  SR 3013, MAIN STREET BRIDGE, OLD FORGE
    30             BOROUGH, BRIDGE PAINTING                      660,000
    19950H1931B2471                 - 57 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $600,000)
     3             (DESIGN AND CONTINGENCIES - $60,000)
     4         (7)  STATE BRIDGES, COUNTYWIDE BRIDGE ZONE
     5             PAINTING, BRIDGE PAINTING                     370,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $350,000)
     8             (LAND ALLOCATION - $10,000)
     9             (DESIGN AND CONTINGENCIES - $10,000)
    10  SECTION 40.  (RESERVED).
    11  SECTION 41.  LAWRENCE COUNTY.
    12     (A)  LOCAL BRIDGES
    13         (1)  CITY OF NEW CASTLE, WILLARD AVENUE
    14             BRIDGE OVER TRIBUTARY OF SHENANGO
    15             RIVER, BRIDGE REPLACEMENT                     210,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $150,000)
    18             (LAND ALLOCATION - $20,000)
    19             (DESIGN AND CONTINGENCIES - $40,000)
    20         (2)  WAMPUM BOROUGH, MAIN STREET BRIDGE
    21             OVER ECKLES RUN, BRIDGE REHABILITATION        190,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $150,000)
    24             (DESIGN AND CONTINGENCIES - $40,000)
    25     (B)  STATE BRIDGES
    26         (1)  SR 0018, MAHONING AVENUE VIADUCT OVER
    27             SHENANGO RIVER AND RAILROAD, CITY OF
    28             NEW CASTLE, BRIDGE REPLACEMENT              9,320,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $9,000,000)
    19950H1931B2471                 - 58 -

     1             (LAND ALLOCATION - $20,000)
     2             (DESIGN AND CONTINGENCIES - $300,000)
     3         (2)  SR 0018, LIBERTY STREET BRIDGE OVER
     4             HICKORY RUN, NEW CASTLE CITY, BRIDGE
     5             REHABILITATION                                450,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $300,000)
     8             (LAND ALLOCATION - $50,000)
     9             (DESIGN AND CONTINGENCIES - $100,000)
    10         (3)  SR 0060, SR 0060 SOUTHBOUND OVER SR
    11             4004, NESHANNOCK TOWNSHIP, BRIDGE
    12             REPLACEMENT                                   350,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $200,000)
    15             (LAND ALLOCATION - $50,000)
    16             (DESIGN AND CONTINGENCIES - $100,000)
    17         (4)  SR 0065, ELLWOOD ROAD BRIDGE OVER B&O
    18             RAILROAD, SHENANGO TOWNSHIP, BRIDGE
    19             REPLACEMENT                                   400,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $250,000)
    22             (LAND ALLOCATION - $50,000)
    23             (DESIGN AND CONTINGENCIES - $100,000)
    24         (5)  SR 0488, PORTERSVILLE ROAD BRIDGE OVER
    25             MORRISON RUN, PERRY TOWNSHIP, BRIDGE
    26             REPLACEMENT                                   250,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $100,000)
    29             (LAND ALLOCATION - $50,000)
    30             (DESIGN AND CONTINGENCIES - $100,000)
    19950H1931B2471                 - 59 -

     1         (6)  SR 0488, PORTERSVILLE ROAD BRIDGE OVER
     2             MORRISON RUN, PERRY TOWNSHIP, BRIDGE
     3             REPLACEMENT                                   250,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $100,000)
     6             (LAND ALLOCATION - $50,000)
     7             (DESIGN AND CONTINGENCIES - $100,000)
     8         (7)  SR 3001, SOUTH MAIN STREET BRIDGE OVER
     9             BESSEMER HAUL ROAD, BESSEMER BOROUGH,
    10             BRIDGE REHABILITATION                         950,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $800,000)
    13             (DESIGN AND CONTINGENCIES - $150,000)
    14         (8)  SR 4004, UNION AND NESHANNOCK
    15             TOWNSHIPS, BRIDGE REHABILITATION              800,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $700,000)
    18             (DESIGN AND CONTINGENCIES - $100,000)
    19  SECTION 42.  LEBANON COUNTY.
    20     (A)  LOCAL BRIDGES
    21         (1)  UNION TOWNSHIP, T-617, GREEN POINT
    22             SCHOOL HOUSE BRIDGE OVER TROUT RUN,
    23             BRIDGE REPLACEMENT                            255,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $170,000)
    26             (LAND ALLOCATION - $10,000)
    27             (DESIGN AND CONTINGENCIES - $75,000)
    28     (B)  STATE BRIDGES
    29         (1)  SR 0072, EBENEZER ROAD BRIDGE OVER
    30             RAILROAD, SWATARA TOWNSHIP, BRIDGE
    19950H1931B2471                 - 60 -

     1             REMOVAL                                     1,042,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $650,000)
     4             (LAND ALLOCATION - $312,000)
     5             (DESIGN AND CONTINGENCIES - $80,000)
     6         (2)  SR 1022, SWATARA CREEK BRIDGE OVER
     7             SWATARA CREEK, UNION AND SWATARA
     8             TOWNSHIPS, BRIDGE REPLACEMENT               1,507,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $1,278,000)
    11             (LAND ALLOCATION - $38,000)
    12             (DESIGN AND CONTINGENCIES - $191,000)
    13  SECTION 43.  (RESERVED).
    14  SECTION 44.  LUZERNE COUNTY.
    15     (A)  LOCAL BRIDGES
    16         (1)  ASHLEY BOROUGH, ASHLEY STREET BRIDGE,
    17             BRIDGE REMOVAL                                260,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $200,000)
    20             (LAND ALLOCATION - $5,000)
    21             (DESIGN AND CONTINGENCIES - $55,000)
    22         (2)  FRANKLIN TOWNSHIP, T-784, BRIDGE OVER
    23             SUTTON CREEK, BRIDGE REPLACEMENT              320,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $250,000)
    26             (LAND ALLOCATION - $15,000)
    27             (DESIGN AND CONTINGENCIES - $55,000)
    28     (B)  STATE BRIDGES
    29         (1)  SR 0011, ERIE-LACKAWANNA RAILROAD
    30             BRIDGE OVER ERIE-LACKAWANNA RAILROAD,
    19950H1931B2471                 - 61 -

     1             PLYMOUTH TOWNSHIP, BRIDGE REMOVAL             185,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $150,000)
     4             (LAND ALLOCATION - $10,000)
     5             (DESIGN AND CONTINGENCIES - $25,000)
     6         (2)  SR 1030, HARVEY'S LAKE BRIDGE AT
     7             JUNCTION OF SR 1053, LAKE TOWNSHIP,
     8             BRIDGE REPLACEMENT                            460,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $350,000)
    11             (LAND ALLOCATION - $20,000)
    12             (DESIGN AND CONTINGENCIES - $90,000)
    13         (3)  SR 3007, BRIDGE OVER WAPWALLOPEN
    14             CREEK, SOUTH OF SR 3010, DORRANCE
    15             TOWNSHIP, BRIDGE REPLACEMENT                  530,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $420,000)
    18             (LAND ALLOCATION - $10,000)
    19             (DESIGN AND CONTINGENCIES - $100,000)
    20         (4)  STATE BRIDGES, COUNTYWIDE BRIDGE ZONE
    21             PAINTING, BRIDGE PAINTING                     370,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $350,000)
    24             (LAND ALLOCATION - $10,000)
    25             (DESIGN AND CONTINGENCIES - $10,000)
    26  SECTION 45.  LYCOMING COUNTY.
    27     (A)  LOCAL BRIDGES
    28         (1)  RETROACTIVE RESERVE FOR LOCAL BRIDGE
    29             PROJECTS                                      310,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19950H1931B2471                 - 62 -

     1             $250,000)
     2             (LAND ALLOCATION - $10,000)
     3             (DESIGN AND CONTINGENCIES - $50,000)
     4     (B)  STATE BRIDGES
     5         (1)  SR 0220, QUENSHUKENY RUN BRIDGE OVER
     6             QUENSHUKENY RUN, VILLAGE OF LINDEN,
     7             BRIDGE REPLACEMENT                            395,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $316,000)
    10             (LAND ALLOCATION - $20,000)
    11             (DESIGN AND CONTINGENCIES - $59,000)
    12         (2)  SR 0973, BRIDGE OVER HOAGLAND RUN, 3
    13             MILES WEST OF COGAN STATION, BRIDGE
    14             REHABILITATION                                195,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $156,000)
    17             (LAND ALLOCATION - $10,000)
    18             (DESIGN AND CONTINGENCIES - $29,000)
    19         (3)  SR 1006, WALLIS RUN BRIDGE OVER WALLIS
    20             RUN, CASCADE TOWNSHIP, BRIDGE
    21             REPLACEMENT                                    65,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $50,000)
    24             (LAND ALLOCATION - $5,000)
    25             (DESIGN AND CONTINGENCIES - $10,000)
    26         (4)  SR 2022, MILL CREEK BRIDGE, NORTH OF
    27             MONTOURSVILLE, BRIDGE REPLACEMENT             668,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $575,000)
    30             (LAND ALLOCATION - $43,000)
    19950H1931B2471                 - 63 -

     1             (DESIGN AND CONTINGENCIES - $50,000)
     2         (5)  SR 2051, WOLF RUN BRIDGE OVER WOLF
     3             RUN, SOUTH OF SR 0220, MUNCY TOWNSHIP,
     4             BRIDGE REPLACEMENT                            638,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $510,000)
     7             (LAND ALLOCATION - $32,000)
     8             (DESIGN AND CONTINGENCIES - $96,000)
     9         (6)  SR 3024, JOBS RUN ROAD BRIDGE OVER
    10             TRIBUTARY OF LARRYS CREEK, EAST OF
    11             SALLADASBURG, BRIDGE REPLACEMENT              108,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $92,000)
    14             (LAND ALLOCATION - $8,000)
    15             (DESIGN AND CONTINGENCIES - $8,000)
    16         (7)  SR 3028, WEST 4TH STREET, LYCOMING
    17             CREEK BRIDGE, CITY OF WILLIAMSPORT,
    18             BRIDGE REHABILITATION                         216,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $185,000)
    21             (LAND ALLOCATION - $15,000)
    22             (DESIGN AND CONTINGENCIES - $16,000)
    23         (8)  SR 0044, BRIDGE OVER CONRAIL, BRIDGE
    24             PAINTING                                      210,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $200,000)
    27             (DESIGN AND CONTINGENCIES - $10,000)
    28         (9)  SR 0180, I-180 EASTBOUND BRIDGE OVER
    29             LOYALSOCK CREEK, BRIDGE PAINTING              135,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19950H1931B2471                 - 64 -

     1             $125,000)
     2             (DESIGN AND CONTINGENCIES - $10,000)
     3         (10)  SR 0180, I-180 WESTBOUND BRIDGE OVER
     4             LOYALSOCK CREEK, BRIDGE PAINTING              135,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $125,000)
     7             (DESIGN AND CONTINGENCIES - $10,000)
     8         (11)  SR 2014, BRIDGE OVER LYCOMING CREEK,
     9             BRIDGE PAINTING                               780,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $770,000)
    12             (DESIGN AND CONTINGENCIES - $10,000)
    13         (12)  SR 2061, BRIDGE OVER LITTLE MUNCY
    14             CREEK, BRIDGE PAINTING                         80,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $70,000)
    17             (DESIGN AND CONTINGENCIES - $10,000)
    18  SECTION 46.  MCKEAN COUNTY.
    19     (A)  LOCAL BRIDGES
    20         (1)  FOSTER TOWNSHIP, T-359, GARLOCK HOLLOW
    21             BRIDGE OVER KENDALL CREEK, BRIDGE
    22             REPLACEMENT                                   580,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $400,000)
    25             (LAND ALLOCATION - $20,000)
    26             (DESIGN AND CONTINGENCIES - $160,000)
    27     (B)  STATE BRIDGES
    28         (1)  SR 3009, KINZUA CREEK BRIDGE OVER
    29             KINZUA CREEK, BOROUGH OF MT. JEWETT,
    30             BRIDGE REPLACEMENT                            880,000
    19950H1931B2471                 - 65 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $700,000)
     3             (LAND ALLOCATION - $30,000)
     4             (DESIGN AND CONTINGENCIES - $150,000)
     5         (2)  SR 4005, KENDALL CREEK BRIDGE OVER
     6             KENDALL CREEK, CITY OF BRADFORD, BRIDGE
     7             REPLACEMENT                                   800,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $650,000)
    10             (LAND ALLOCATION - $50,000)
    11             (DESIGN AND CONTINGENCIES - $100,000)
    12  SECTION 47.  MERCER COUNTY.
    13     (A)  LOCAL BRIDGES
    14         (1)  CITY OF SHARON, SERVICE AVENUE BRIDGE
    15             OVER PINE RUN, BRIDGE REPLACEMENT             240,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $210,000)
    18             (LAND ALLOCATION - $5,000)
    19             (DESIGN AND CONTINGENCIES - $25,000)
    20         (2)  CITY OF SHARON, WENGLER AVENUE BRIDGE
    21             OVER PINE HOLLOW RUN, BRIDGE
    22             REPLACEMENT                                   218,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $193,000)
    25             (LAND ALLOCATION - $5,000)
    26             (DESIGN AND CONTINGENCIES - $20,000)
    27         (3)  PINE TOWNSHIP, T-355, PINCHLONG ROAD
    28             BRIDGE OVER SWAMP RUN, BRIDGE
    29             REPLACEMENT                                   203,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19950H1931B2471                 - 66 -

     1             $178,000)
     2             (LAND ALLOCATION - $5,000)
     3             (DESIGN AND CONTINGENCIES - $20,000)
     4         (4)  PINE TOWNSHIP, T-878, DIAMOND ROAD
     5             BRIDGE OVER WOLF CREEK, BRIDGE
     6             REPLACEMENT                                 1,813,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $1,668,000)
     9             (LAND ALLOCATION - $60,000)
    10             (DESIGN AND CONTINGENCIES - $85,000)
    11         (5)  PINE TOWNSHIP, T-413, DAUGHERTY ROAD
    12             BRIDGE OVER WOLF RUN, BRIDGE
    13             REPLACEMENT                                   407,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $352,000)
    16             (LAND ALLOCATION - $15,000)
    17             (DESIGN AND CONTINGENCIES - $40,000)
    18         (6)  SHENANGO TOWNSHIP, T-955, OAK HILL
    19             ROAD BRIDGE OVER TURKEY RUN, BRIDGE
    20             REPLACEMENT                                   297,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $257,000)
    23             (LAND ALLOCATION - $10,000)
    24             (DESIGN AND CONTINGENCIES - $30,000)
    25         (7)  SHENANGO TOWNSHIP, HEASLEY ROAD BRIDGE
    26             OVER TRIBUTARY OF SHENANGO RIVER,
    27             BRIDGE REPLACEMENT                            173,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $155,000)
    30             (LAND ALLOCATION - $3,000)
    19950H1931B2471                 - 67 -

     1             (DESIGN AND CONTINGENCIES - $15,000)
     2         (8)  SPRINGFIELD TOWNSHIP, T-722, SPRING
     3             ROAD BRIDGE OVER MILL RUN, BRIDGE
     4             REPLACEMENT                                   230,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $200,000)
     7             (LAND ALLOCATION - $5,000)
     8             (DESIGN AND CONTINGENCIES - $25,000)
     9         (9)  WORTH TOWNSHIP, T-912, JACK ATWELL
    10             ROAD BRIDGE OVER WOLF CREEK, BRIDGE
    11             REPLACEMENT                                   297,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $257,000)
    14             (LAND ALLOCATION - $10,000)
    15             (DESIGN AND CONTINGENCIES - $30,000)
    16     (B)  STATE BRIDGES (RESERVED)
    17  SECTION 48.  MIFFLIN COUNTY.
    18     (A)  LOCAL BRIDGES
    19         (1)  OLIVER TOWNSHIP, T-803, BRIDGE OVER
    20             MUSSER RUN, BRIDGE REPLACEMENT                492,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $390,000)
    23             (LAND ALLOCATION - $2,000)
    24             (DESIGN AND CONTINGENCIES - $100,000)
    25     (B)  STATE BRIDGES
    26         (1)  SR 0022, BRIDGE OVER KISH CREEK,
    27             LEWISTOWN BOROUGH, BRIDGE PAINTING            800,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $720,000)
    30             (DESIGN AND CONTINGENCIES - $80,000)
    19950H1931B2471                 - 68 -

     1         (2)  SR 3017, BRIDGE OVER JUNIATA RIVER,
     2             WAYNE TOWNSHIP, BRIDGE PAINTING               935,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $850,000)
     5             (DESIGN AND CONTINGENCIES - $85,000)
     6  SECTION 49.  (RESERVED).
     7  SECTION 50.  MONTGOMERY COUNTY.
     8     (A)  LOCAL BRIDGES
     9         (1)  NORRISTOWN BOROUGH, HOSPITAL BRIDGE
    10             OVER STONY CREEK, BRIDGE REPLACEMENT          412,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $365,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $37,000)
    15         (2)  TRAPPE BOROUGH, COLLEGE AVENUE BRIDGE
    16             OVER TRIBUTARY OF PERKIOMEN CREEK,
    17             BRIDGE REPLACEMENT                            360,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $300,000)
    20             (LAND ALLOCATION - $10,000)
    21             (DESIGN AND CONTINGENCIES - $50,000)
    22         (3)  TOWAMENCIN TOWNSHIP, BUSTARD ROAD
    23             BRIDGE OVER TOWAMENCIN CREEK, BRIDGE
    24             REPLACEMENT                                   454,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $400,000)
    27             (LAND ALLOCATION - $10,000)
    28             (DESIGN AND CONTINGENCIES - $44,000)
    29         (4)  UPPER HANOVER TOWNSHIP, T-444,
    30             TREICHLER ROAD BRIDGE UNDER READING
    19950H1931B2471                 - 69 -

     1             RAILROAD, BRIDGE REMOVAL                      151,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $126,000)
     4             (LAND ALLOCATION - $5,000)
     5             (DESIGN AND CONTINGENCIES - $20,000)
     6         (5)  UPPER PROVIDENCE TOWNSHIP, T-400,
     7             SUPIO ROAD BRIDGE UNDER READING
     8             RAILROAD, BRIDGE REMOVAL                      187,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $157,000)
    11             (LAND ALLOCATION - $5,000)
    12             (DESIGN AND CONTINGENCIES - $25,000)
    13         (6)  UPPER SALFORD TOWNSHIP, T-444, BRIDGE
    14             OVER ABANDONED RAILROAD, BRIDGE
    15             REMOVAL                                     1,175,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $1,000,000)
    18             (LAND ALLOCATION - $25,000)
    19             (DESIGN AND CONTINGENCIES - $150,000)
    20     (B)  STATE BRIDGES
    21         (1)  SR 2009, BYBERRY ROAD BRIDGE OVER
    22             SOUTHAMPTON CREEK, UPPER MORELAND
    23             TOWNSHIP AND BRYN ATHYN BOROUGH,
    24             HISTORIC BRIDGE REPLACEMENT                   680,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $500,000)
    27             (LAND ALLOCATION - $20,000)
    28             (DESIGN AND CONTINGENCIES - $160,000)
    29         (2)  SR 2018, BETHLEHEM PIKE BRIDGE OVER
    30             BRANCH OF WISSAHICKON CREEK,
    19950H1931B2471                 - 70 -

     1             SPRINGFIELD TOWNSHIP, BRIDGE
     2             REHABILITATION                                525,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $400,000)
     5             (LAND ALLOCATION - $25,000)
     6             (DESIGN AND CONTINGENCIES - $100,000)
     7         (3)  SR 4030, NEW HANOVER SQUARE ROAD
     8             BRIDGE OVER WEST SWAMP CREEK (TWO
     9             BRIDGES), NEW HANOVER TOWNSHIP, BRIDGE
    10             REPLACEMENT                                 1,150,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $900,000)
    13             (LAND ALLOCATION - $50,000)
    14             (DESIGN AND CONTINGENCIES - $200,000)
    15         (4)  SR 0100, EXTENDED, (THREE BRIDGES),
    16             HIGH STREET TO FARMINGTON ROAD,
    17             POTTSTOWN BOROUGH AND UPPER POTTSGROVE
    18             TOWNSHIP, BRIDGE REHABILITATION             1,650,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $1,500,000)
    21             (LAND ALLOCATION - $50,000)
    22             (DESIGN AND CONTINGENCIES - $100,000)
    23         (5)  SR 1017, SALFORDVILLE ROAD BRIDGE OVER
    24             EAST BRANCH OF PERKIOMEN CREEK, LOWER
    25             SALFORD TOWNSHIP, BRIDGE REPLACEMENT        1,500,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $1,250,000)
    28             (LAND ALLOCATION - $50,000)
    29             (DESIGN AND CONTINGENCIES - $200,000)
    30         (6)  SR 1024, SALFORD STATION (TWO BRIDGES)
    19950H1931B2471                 - 71 -

     1             OVER PERKIOMEN CREEK, UPPER SALFORD AND
     2             LOWER FREDRICK TOWNSHIPS, BRIDGE
     3             REPLACEMENT                                 1,200,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $1,000,000)
     6             (LAND ALLOCATION - $50,000)
     7             (DESIGN AND CONTINGENCIES - $150,000)
     8         (7)  SR 3020, DANNEHOWER BRIDGE OVER RIVER
     9             AND NEW US 202, UPPER MERION TOWNSHIP,
    10             BRIDGEPORT AND NORRISTOWN BOROUGHS,
    11             BRIDGE PAINTING                               872,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $802,000)
    14             (DESIGN AND CONTINGENCIES - $70,000)
    15         (8)  SR 3039, SOUTH GULPH ROAD OVERPASS
    16             UNDER CONRAIL, UPPER MERION TOWNSHIP,
    17             BRIDGE REPLACEMENT                          1,500,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $1,300,000)
    20             (LAND ALLOCATION - $50,000)
    21             (DESIGN AND CONTINGENCIES - $150,000)
    22         (9)  SR 4003, BLACK ROCK ROAD BRIDGE OVER
    23             ABANDONED READING TRACK, UPPER
    24             PROVIDENCE TOWNSHIP, BRIDGE REMOVAL           205,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $175,000)
    27             (LAND ALLOCATION - $10,000)
    28             (DESIGN AND CONTINGENCIES - $20,000)
    29         (10)  SR 4012, GRATERFORD ROAD BRIDGE OVER
    30             PERKIOMEN CREEK, SKIPPACK AND PERKIOMEN
    19950H1931B2471                 - 72 -

     1             TOWNSHIPS, BRIDGE REPLACEMENT               1,475,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $1,300,000)
     4             (LAND ALLOCATION - $50,000)
     5             (DESIGN AND CONTINGENCIES - $125,000)
     6  SECTION 51.  MONTOUR COUNTY.
     7     (A)  LOCAL BRIDGES
     8         (1)  DERRY TOWNSHIP, T-407, COUNTY BRIDGE
     9             NO.13 OVER WEST BRANCH OF CHILLISQUAQUE
    10             CREEK NEAR WASHINGTONVILLE BOROUGH,
    11             BRIDGE REPLACEMENT                            350,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $265,000)
    14             (LAND ALLOCATION - $35,000)
    15             (DESIGN AND CONTINGENCIES - $50,000)
    16     (B)  STATE BRIDGES
    17         (1)  SR 1004, BRIDGE OVER CHILLISQUAQUE
    18             CREEK, NORTH OF WASHINGTONVILLE
    19             BOROUGH, BRIDGE REPLACEMENT                   620,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $500,000)
    22             (LAND ALLOCATION - $40,000)
    23             (DESIGN AND CONTINGENCIES - $80,000)
    24         (2)  SR 1006, BRIDGE OVER BRANCH OF
    25             CHILLISQUAQUE CREEK, 3 MILES NORTHWEST
    26             OF WASHINGTONVILLE BOROUGH, BRIDGE
    27             REPLACEMENT                                   510,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $410,000)
    30             (LAND ALLOCATION - $25,000)
    19950H1931B2471                 - 73 -

     1             (DESIGN AND CONTINGENCIES - $80,000)
     2         (3)  SR 3004, BRIDGE OVER BEAVER RUN, 2
     3             MILES WEST OF MORESBURG, BRIDGE
     4             REPLACEMENT                                   285,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $227,000)
     7             (LAND ALLOCATION - $14,000)
     8             (DESIGN AND CONTINGENCIES - $44,000)
     9  SECTION 52.  (RESERVED).
    10  SECTION 53.  NORTHUMBERLAND COUNTY.
    11     (A)  LOCAL BRIDGES (RESERVED)
    12     (B)  STATE BRIDGES
    13         (1)  SR 0642, CHILLISQUAQUE CREEK BRIDGE
    14             OVER CHILLISQUAQUE CREEK, 0.5 MILE EAST
    15             OF POTTSGROVE, BRIDGE DECK REPLACEMENT      1,184,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $947,000)
    18             (LAND ALLOCATION - $59,000)
    19             (DESIGN AND CONTINGENCIES - $178,000)
    20         (2)  SR 1005, DELAWARE RUN BRIDGE OVER
    21             DELAWARE RUN, 3 MILES NORTH OF
    22             WATSONTOWN BOROUGH, BRIDGE REPLACEMENT        509,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $408,000)
    25             (LAND ALLOCATION - $25,000)
    26             (DESIGN AND CONTINGENCIES - $76,000)
    27         (3)  SR 0045, BRIDGE OVER CHILLISQUAQUE
    28             CREEK, EAST OF SR 0147, BRIDGE
    29             PAINTING                                      260,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19950H1931B2471                 - 74 -

     1             $250,000)
     2             (DESIGN AND CONTINGENCIES - $10,000)
     3  SECTION 54.  PERRY COUNTY.
     4     (A)  LOCAL BRIDGES
     5         (1)  TYRONE TOWNSHIP, COUNTY BRIDGE NO.4,
     6             RICES BRIDGE OVER SHERMANS CREEK,
     7             COVERED BRIDGE REPLACEMENT                    768,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $552,000)
    10             (LAND ALLOCATION - $77,000)
    11             (DESIGN AND CONTINGENCIES - $139,000)
    12     (B)  STATE BRIDGES
    13         (1)  SR 4006, RACCOON CREEK BRIDGE OVER
    14             RACCOON CREEK, TUSCARORA TOWNSHIP,
    15             BRIDGE REPLACEMENT                            466,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $288,000)
    18             (LAND ALLOCATION - $20,000)
    19             (DESIGN AND CONTINGENCIES - $158,000)
    20  SECTION 55.  PHILADELPHIA COUNTY.
    21     (A)  LOCAL BRIDGES
    22         (1)  CITY OF PHILADELPHIA, BYBERRY ROAD
    23             BRIDGE OVER CONRAIL, TEMPORARY BRIDGE
    24             CONSTRUCTION                                  511,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $390,000)
    27             (LAND ALLOCATION - $51,000)
    28             (DESIGN AND CONTINGENCIES - $70,000)
    29         (2)  CITY OF PHILADELPHIA, WYOMING AVENUE
    30             BRIDGE OVER FORMER COURSE FRANKFORD
    19950H1931B2471                 - 75 -

     1             CREEK, WEST OF CASTOR AVENUE, BRIDGE
     2             REPLACEMENT                                 1,300,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $1,200,000)
     5             (DESIGN AND CONTINGENCIES - $100,000)
     6         (3)  CITY OF PHILADELPHIA, CHELTEN AVENUE
     7             BRIDGE OVER SEPTA, WEST OF WAYNE
     8             AVENUE, BRIDGE REPLACEMENT                  2,300,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $2,100,000)
    11             (DESIGN AND CONTINGENCIES - $200,000)
    12         (4)  CITY OF PHILADELPHIA, FISHER'S LANE
    13             BRIDGE OVER TACONY CREEK, WEST OF
    14             RAMONA AVENUE, BRIDGE REPLACEMENT           1,625,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $1,400,000)
    17             (DESIGN AND CONTINGENCIES - $225,000)
    18         (5)  CITY OF PHILADELPHIA, BRIDGE
    19             REHABILITATION II IN VARIOUS PARTS OF
    20             CITY, BRIDGE REHABILITATION                 2,100,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $2,000,000)
    23             (DESIGN AND CONTINGENCIES - $100,000)
    24         (6)  CITY OF PHILADELPHIA, KINGSESSING
    25             AVENUE BRIDGE OVER SEPTA, BRIDGE
    26             REPLACEMENT                                 2,550,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $2,200,000)
    29             (LAND ALLOCATION - $100,000)
    30             (DESIGN AND CONTINGENCIES - $250,000)
    19950H1931B2471                 - 76 -

     1         (7)  CITY OF PHILADELPHIA, MONTGOMERY
     2             BRIDGE OVER AMTRAK, BRIDGE REPLACEMENT      5,275,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $4,750,000)
     5             (LAND ALLOCATION - $125,000)
     6             (DESIGN AND CONTINGENCIES - $400,000)
     7         (8)  CITY OF PHILADELPHIA, THOMAS AVENUE
     8             BRIDGE OVER SEPTA, BRIDGE REPLACEMENT       3,150,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $2,750,000)
    11             (LAND ALLOCATION - $100,000)
    12             (DESIGN AND CONTINGENCIES - $300,000)
    13         (9)  CITY OF PHILADELPHIA, SEDGLEY AVENUE
    14             BRIDGE OVER CONRAIL, BRIDGE
    15             REPLACEMENT                                 1,000,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $800,000)
    18             (LAND ALLOCATION - $100,000)
    19             (DESIGN AND CONTINGENCIES - $100,000)
    20         (10)  CITY OF PHILADELPHIA, LEXINGTON
    21             AVENUE BRIDGE OVER CONRAIL, BRIDGE
    22             REPLACEMENT                                   420,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $360,000)
    25             (LAND ALLOCATION - $20,000)
    26             (DESIGN AND CONTINGENCIES - $40,000)
    27         (11)  CITY OF PHILADELPHIA, GREENLAND
    28             BRIDGE OVER CONRAIL AND I-76, BRIDGE
    29             REPLACEMENT                                 1,350,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19950H1931B2471                 - 77 -

     1             $1,100,000)
     2             (LAND ALLOCATION - $100,000)
     3             (DESIGN AND CONTINGENCIES - $150,000)
     4         (12)  CITY OF PHILADELPHIA, GLENWOOD DRIVE
     5             BRIDGE OVER CONRAIL, BRIDGE
     6             REPLACEMENT                                 1,450,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $1,200,000)
     9             (LAND ALLOCATION - $100,000)
    10             (DESIGN AND CONTINGENCIES - $150,000)
    11         (13)  CITY OF PHILADELPHIA, SECOND STREET
    12             BRIDGE OVER CONRAIL, BRIDGE
    13             REPLACEMENT                                   740,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $650,000)
    16             (LAND ALLOCATION - $20,000)
    17             (DESIGN AND CONTINGENCIES - $70,000)
    18         (14)  CITY OF PHILADELPHIA, CAMBRIA STREET
    19             BRIDGE OVER CONRAIL, BRIDGE
    20             REPLACEMENT                                 2,750,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $2,400,000)
    23             (LAND ALLOCATION - $100,000)
    24             (DESIGN AND CONTINGENCIES - $250,000)
    25     (B)  STATE BRIDGES
    26         (1)  SR 4007, GERMANTOWN AVENUE BRIDGE,
    27             CONRAIL OVERPASS, CITY OF PHILADELPHIA,
    28             BRIDGE REMOVAL                                125,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $100,000)
    19950H1931B2471                 - 78 -

     1             (LAND ALLOCATION - $10,000)
     2             (DESIGN AND CONTINGENCIES - $15,000)
     3         (2)  SR 0076, SCHUYLKILL EXPRESSWAY BRIDGE
     4             OVER SCHUYLKILL RIVER, CITY OF
     5             PHILADELPHIA, BRIDGE PAINTING               2,580,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $2,390,000)
     8             (DESIGN AND CONTINGENCIES - $190,000)
     9         (3)  SR 2003, 5TH STREET BRIDGE OVER
    10             AMTRAK, CITY OF PHILADELPHIA, BRIDGE
    11             REPLACEMENT                                 2,400,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $2,000,000)
    14             (LAND ALLOCATION - $200,000)
    15             (DESIGN AND CONTINGENCIES - $200,000)
    16         (4)  SR 3008, CHESTNUT STREET BRIDGE OVER
    17             SCHUYLKILL RIVER, CITY OF PHILADELPHIA,
    18             BRIDGE PAINTING                               477,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $426,000)
    21             (DESIGN AND CONTINGENCIES - $51,000)
    22         (5)  SR 3037, JFK BOULEVARD BRIDGE OVER
    23             SCHUYLKILL RIVER, CITY OF PHILADELPHIA,
    24             BRIDGE PAINTING                               857,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $794,000)
    27             (DESIGN AND CONTINGENCIES - $63,000)
    28  SECTION 56.  PIKE COUNTY.
    29     (A)  LOCAL BRIDGES (RESERVED)
    30     (B)  STATE BRIDGES
    19950H1931B2471                 - 79 -

     1         (1)  SR 0390, BRIDGE KILL CREEK BRIDGE,
     2             NORTH OF SR 3002, GREEN TOWNSHIP,
     3             BRIDGE REPLACEMENT                            430,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $340,000)
     6             (LAND ALLOCATION - $10,000)
     7             (DESIGN AND CONTINGENCIES - $80,000)
     8         (2)  SR 2011, BRIDGE OVER OUTLET TO SAWKILL
     9             POND, SOUTH OF TR 6, DINGMAN TOWNSHIP,
    10             BRIDGE REPLACEMENT                            355,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $275,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $70,000)
    15         (3)  SR 0434, SHOHOLA BRIDGE OVER DELAWARE
    16             RIVER, SHOHOLA TOWNSHIP AND NEW YORK
    17             STATE LINE, BRIDGE PAINTING                 2,200,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $2,000,000)
    20             (DESIGN AND CONTINGENCIES - $200,000)
    21         (4)  STATE BRIDGES, COUNTYWIDE BRIDGE ZONE
    22             PAINTING, BRIDGE PAINTING                     370,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $350,000)
    25             (LAND ALLOCATION - $10,000)
    26             (DESIGN AND CONTINGENCIES - $10,000)
    27  SECTION 57.  (RESERVED).
    28  SECTION 58.  (RESERVED).
    29  SECTION 59.  SNYDER COUNTY.
    30     (A)  LOCAL BRIDGES (RESERVED)
    19950H1931B2471                 - 80 -

     1     (B)  STATE BRIDGES
     2         (1)  SR 1011, PINE STREET BRIDGE OVER
     3             PENN'S CREEK, SELINSGROVE, BRIDGE
     4             REHABILITATION                              1,150,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $940,000)
     7             (LAND ALLOCATION - $10,000)
     8             (DESIGN AND CONTINGENCIES - $200,000)
     9         (2)  SR 3002, BRIDGE OVER MAHANTANGO CREEK,
    10             1.5 MILES SOUTH OF MEISERVILLE, PERRY
    11             AND CHAPMAN TOWNSHIPS LINE, BRIDGE
    12             REHABILITATION                              1,425,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $1,211,000)
    15             (DESIGN AND CONTINGENCIES - $214,000)
    16         (3)  SR 4007, MIDDLE CREEK BRIDGE OVER
    17             MIDDLE CREEK, NORTH OF SR 0522 AND
    18             SOUTH OF SR 4012, BRIDGE REPLACEMENT        1,158,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $926,000)
    21             (LAND ALLOCATION - $58,000)
    22             (DESIGN AND CONTINGENCIES - $174,000)
    23         (4)  SR 0522, BRIDGE OVER MIDDLE CREEK,
    24             BRIDGE PAINTING                               180,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $170,000)
    27             (DESIGN AND CONTINGENCIES - $10,000)
    28  SECTION 60.  SOMERSET COUNTY.
    29     (A)  LOCAL BRIDGES
    30         (1)  MIDDLECREEK TOWNSHIP, T-338, BLUE HOLE
    19950H1931B2471                 - 81 -

     1             CREEK BRIDGE OVER BLUE HOLE CREEK,
     2             BRIDGE REPLACEMENT                            505,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $400,000)
     5             (LAND ALLOCATION - $10,000)
     6             (DESIGN AND CONTINGENCIES - $95,000)
     7         (2)  PAINT BOROUGH, PENNSYLVANIA RAILROAD
     8             BRIDGE OVER BEDFORD STREET, BRIDGE
     9             REPLACEMENT                                   350,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $250,000)
    12             (LAND ALLOCATION - $25,000)
    13             (DESIGN AND CONTINGENCIES - $75,000)
    14         (3)  SHADE TOWNSHIP, T-712, LIPINSKI ROAD
    15             BRIDGE OVER DARK SHADE CREEK, BRIDGE
    16             REPLACEMENT                                   560,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $450,000)
    19             (LAND ALLOCATION - $10,000)
    20             (DESIGN AND CONTINGENCIES - $100,000)
    21         (4)  SOMERSET BOROUGH, CHURCH STREET BRIDGE
    22             OVER PARSONS RUN, BRIDGE REPLACEMENT          350,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $250,000)
    25             (LAND ALLOCATION - $25,000)
    26             (DESIGN AND CONTINGENCIES - $75,000)
    27         (5)  WINDBER BOROUGH, SOUTH 22ND STREET
    28             BRIDGE OVER SEESE RUN, BRIDGE
    29             REPLACEMENT                                   350,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19950H1931B2471                 - 82 -

     1             $250,000)
     2             (LAND ALLOCATION - $25,000)
     3             (DESIGN AND CONTINGENCIES - $75,000)
     4         (6)  WINDBER BOROUGH, 24TH STREET BRIDGE
     5             OVER SEESE RUN, BRIDGE REPLACEMENT            350,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $250,000)
     8             (LAND ALLOCATION - $25,000)
     9             (DESIGN AND CONTINGENCIES - $75,000)
    10         (7)  WINDBER BOROUGH, VILLAGE STREET BRIDGE
    11             OVER SEESE RUN, BRIDGE REPLACEMENT            350,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $250,000)
    14             (LAND ALLOCATION - $25,000)
    15             (DESIGN AND CONTINGENCIES - $75,000)
    16     (B)  STATE BRIDGES (RESERVED)
    17  SECTION 61.  SULLIVAN COUNTY.
    18     (A)  LOCAL BRIDGES
    19         (1)  FORKS TOWNSHIP, T-448, OLD TR 87
    20             BRIDGE, COUNTY BRIDGE NO.55 OVER LITTLE
    21             LOYALSOCK CREEK, BRIDGE REPLACEMENT           860,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $700,000)
    24             (LAND ALLOCATION - $10,000)
    25             (DESIGN AND CONTINGENCIES - $150,000)
    26     (B)  STATE BRIDGES (RESERVED)
    27  SECTION 62.  SUSQUEHANNA COUNTY.
    28     (A)  LOCAL BRIDGES (RESERVED)
    29     (B)  STATE BRIDGES
    30         (1)  SR 0167, OWEGO STREET BRIDGE OVER
    19950H1931B2471                 - 83 -

     1             BRANCH OF FALL BROOK, BRIDGEWATER
     2             TOWNSHIP, BRIDGE REPLACEMENT                  413,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $342,000)
     5             (LAND ALLOCATION - $10,000)
     6             (DESIGN AND CONTINGENCIES - $61,000)
     7         (2)  SR 1016, SALT LICK CREEK BRIDGE OVER
     8             BRANCH OF SALT LICK CREEK, NEW MILFORD
     9             TOWNSHIP, BRIDGE REPLACEMENT                  100,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $86,000)
    12             (LAND ALLOCATION - $3,000)
    13             (DESIGN AND CONTINGENCIES - $11,000)
    14         (3)  SR 0081, BRIDGE OVER TROWBRIDGE CREEK,
    15             1 MILE SOUTH OF PENNSYLVANIA AND NEW
    16             YORK STATE LINE, GREAT BEND TOWNSHIP,
    17             BRIDGE REPLACEMENT                            890,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $700,000)
    20             (LAND ALLOCATION - $10,000)
    21             (DESIGN AND CONTINGENCIES - $180,000)
    22         (4)  SR 1017, GULF STREET BRIDGE, 0.5 MILES
    23             NORTH OF SR 1015, LANESBORO BOROUGH,
    24             BRIDGE REPLACEMENT                            305,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $220,000)
    27             (LAND ALLOCATION - $10,000)
    28             (DESIGN AND CONTINGENCIES - $75,000)
    29         (5)  SR 3003, BRIDGE OVER TRANSUE CREEK,
    30             1.5 MILES SOUTH OF SR 3005, AUBURN
    19950H1931B2471                 - 84 -

     1             TOWNSHIP, BRIDGE PAINTING                      60,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $50,000)
     4             (DESIGN AND CONTINGENCIES - $10,000)
     5         (6)  SR 3006, BRIDGE OVER WHITE CREEK, 1.5
     6             MILES WEST OF SR 3004, SPRINGVILLE
     7             TOWNSHIP, BRIDGE PAINTING                      70,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $60,000)
    10             (DESIGN AND CONTINGENCIES - $10,000)
    11         (7)  SR 0011, BRIDGE OVER SALT LICK CREEK,
    12             0.6 MILE NORTH OF TR 492, NEW MILFORD
    13             BOROUGH, BRIDGE REPLACEMENT                   660,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $510,000)
    16             (LAND ALLOCATION - $20,000)
    17             (DESIGN AND CONTINGENCIES - $130,000)
    18         (8)  SR 0367, BRIDGE OVER TUSCARORA CREEK,
    19             NORTH OF SR 3005, AUBURN TOWNSHIP,
    20             BRIDGE REPLACEMENT                            330,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $265,000)
    23             (LAND ALLOCATION - $10,000)
    24             (DESIGN AND CONTINGENCIES - $65,000)
    25         (9)  SR 1010, BRIDGE OVER BED BUG CREEK,
    26             WEST OF SR 1021, OAKLAND TOWNSHIP,
    27             BRIDGE REPLACEMENT                            325,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $250,000)
    30             (LAND ALLOCATION - $10,000)
    19950H1931B2471                 - 85 -

     1             (DESIGN AND CONTINGENCIES - $65,000)
     2         (10)  SR 1010, BRIDGE OVER TRIBUTARY OF
     3             SUSQUEHANNA RIVER, 2 MILES WEST OF SR
     4             1021, GREAT BEND TOWNSHIP, BRIDGE
     5             REPLACEMENT                                   288,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $220,000)
     8             (LAND ALLOCATION - $10,000)
     9             (DESIGN AND CONTINGENCIES - $58,000)
    10         (11)  SR 2046, BRIDGE OVER BRANCH OF
    11             TUNKHANNOCK CREEK, EAST OF TR 92,
    12             GIBSON TOWNSHIP, BRIDGE REPLACEMENT           513,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $400,000)
    15             (LAND ALLOCATION - $10,000)
    16             (DESIGN AND CONTINGENCIES - $103,000)
    17         (12)  SR 3017, BRIDGE OVER THOMAS CREEK,
    18             SOUTHEAST OF TR 29, SPRINGVILLE
    19             TOWNSHIP, BRIDGE REPLACEMENT                  285,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $220,000)
    22             (LAND ALLOCATION - $10,000)
    23             (DESIGN AND CONTINGENCIES - $50,000)
    24         (13)  STATE BRIDGES, COUNTYWIDE BRIDGE ZONE
    25             PAINTING, BRIDGE PAINTING                     370,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $350,000)
    28             (LAND ALLOCATION - $10,000)
    29             (DESIGN AND CONTINGENCIES - $10,000)
    30  SECTION 63.  TIOGA COUNTY.
    19950H1931B2471                 - 86 -

     1     (A)  LOCAL BRIDGES (RESERVED)
     2     (B)  STATE BRIDGES
     3         (1)  SR 0249, LOSEY CREEK BRIDGE, SOUTH OF
     4             SR 4017 IN VILLAGE OF KEENEYVILLE,
     5             MIDDLEBURY TOWNSHIP, BRIDGE
     6             REHABILITATION                                250,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $210,000)
     9             (LAND ALLOCATION - $5,000)
    10             (DESIGN AND CONTINGENCIES - $35,000)
    11         (2)  SR 1002, COREY CREEK BRIDGE OVER COREY
    12             CREEK, NORTHEAST OF MANSFIELD, BRIDGE
    13             REPLACEMENT                                   346,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $277,000)
    16             (LAND ALLOCATION - $17,000)
    17             (DESIGN AND CONTINGENCIES - $52,000)
    18         (3)  SR 3001, KETTLE CREEK BRIDGE, 11 MILES
    19             SOUTH OF WATROUS, BRIDGE REPLACEMENT          366,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $293,000)
    22             (LAND ALLOCATION - $18,000)
    23             (DESIGN AND CONTINGENCIES - $55,000)
    24         (4)  SR 3023, HEISE RUN NORTH BRIDGE, WEST
    25             OF WELLSBORO, BRIDGE REPLACEMENT              240,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $192,000)
    28             (LAND ALLOCATION - $12,000)
    29             (DESIGN AND CONTINGENCIES - $36,000)
    30         (5)  SR 4017, HOLDEN CREEK BRIDGE NO.1,
    19950H1931B2471                 - 87 -

     1             BRIDGE REPLACEMENT                            584,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $467,000)
     4             (LAND ALLOCATION - $29,000)
     5             (DESIGN AND CONTINGENCIES - $88,000)
     6         (6)  SR 4024, ELKHORN CREEK BRIDGE, WEST OF
     7             TIOGA BOROUGH, BRIDGE REPLACEMENT             451,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $401,000)
    10             (LAND ALLOCATION - $15,000)
    11             (DESIGN AND CONTINGENCIES - $35,000)
    12         (7)  SR 3007, BRIDGE OVER STONEY FORK
    13             CREEK, BRIDGE PAINTING                        160,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $150,000)
    16             (DESIGN AND CONTINGENCIES - $10,000)
    17         (8)  SR 4017, BRIDGE OVER COWANESQUE RIVER,
    18             BRIDGE PAINTING                               475,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $465,000)
    21             (DESIGN AND CONTINGENCIES - $10,000)
    22  SECTION 64.  UNION COUNTY.
    23     (A)  LOCAL BRIDGES (RESERVED)
    24     (B)  STATE BRIDGES
    25         (1)  SR 0192, RAPID RUN BRIDGE II OVER
    26             RAPID RUN, LEWIS TOWNSHIP, BRIDGE
    27             REHABILITATION                                250,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $200,000)
    30             (LAND ALLOCATION - $13,000)
    19950H1931B2471                 - 88 -

     1             (DESIGN AND CONTINGENCIES - $37,000)
     2         (2)  SR 0192, RAPID RUN BRIDGE I OVER RAPID
     3             RUN, LEWIS TOWNSHIP, BRIDGE
     4             REHABILITATION                                205,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $164,000)
     7             (LAND ALLOCATION - $10,000)
     8             (DESIGN AND CONTINGENCIES - $31,000)
     9         (3)  SR 0044, BRIDGE OVER SPRING CREEK,
    10             BRIDGE PAINTING                               110,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $100,000)
    13             (DESIGN AND CONTINGENCIES - $10,000)
    14         (4)  SR 1004, BRIDGE OVER LITTLE BUFFALO
    15             CREEK, BRIDGE PAINTING                         75,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $65,000)
    18             (DESIGN AND CONTINGENCIES - $10,000)
    19         (5)  SR 1012, BRIDGE OVER WHITE DEER HOLE
    20             CREEK, BRIDGE PAINTING                        160,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $150,000)
    23             (DESIGN AND CONTINGENCIES - $10,000)
    24  SECTION 65.  (RESERVED).
    25  SECTION 66.  (RESERVED).
    26  SECTION 67.  WASHINGTON COUNTY.
    27     (A)  LOCAL BRIDGES
    28         (1)  BURGETTSTOWN BOROUGH, RACCOON BRIDGE
    29             NO.23 OVER RACCOON CREEK, BRIDGE
    30             REHABILITATION                                433,000
    19950H1931B2471                 - 89 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $313,000)
     3             (LAND ALLOCATION - $20,000)
     4             (DESIGN AND CONTINGENCIES - $100,000)
     5         (2)  CHARTIERS TOWNSHIP, ALLISON HOLLOW
     6             ROAD, ONE-LANE BRIDGE, BRIDGE
     7             REPLACEMENT                                   195,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $150,000)
    10             (LAND ALLOCATION - $5,000)
    11             (DESIGN AND CONTINGENCIES - $40,000)
    12         (3)  CHARTIERS TOWNSHIP, ALLISON HOLLOW
    13             ROAD, ONE-LANE BRIDGE, BRIDGE
    14             REPLACEMENT                                   195,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $150,000)
    17             (LAND ALLOCATION - $5,000)
    18             (DESIGN AND CONTINGENCIES - $40,000)
    19         (4)  CHARTIERS TOWNSHIP, MCGOVERN ROAD
    20             BRIDGE, BRIDGE REPLACEMENT                    145,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $100,000)
    23             (LAND ALLOCATION - $5,000)
    24             (DESIGN AND CONTINGENCIES - $40,000)
    25         (5)  NORTH STRABANE TOWNSHIP, T-643, GALLEY
    26             ROAD BRIDGE OVER LITTLE CHARTIERS
    27             CREEK, BRIDGE REPLACEMENT                     570,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $450,000)
    30             (LAND ALLOCATION - $20,000)
    19950H1931B2471                 - 90 -

     1             (DESIGN AND CONTINGENCIES - $100,000)
     2     (B)  STATE BRIDGES
     3         (1)  SR 0018, BRIDGE OVER ABANDONED
     4             RAILROAD, CITY OF WASHINGTON, BRIDGE
     5             REPLACEMENT                                   650,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $500,000)
     8             (LAND ALLOCATION - $25,000)
     9             (DESIGN AND CONTINGENCIES - $125,000)
    10         (2)  SR 0019, BRIDGE OVER CHARTIERS CREEK,
    11             NORTH STRABANE AND PETERS TOWNSHIPS,
    12             BRIDGE PAINTING                               161,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $156,000)
    15             (DESIGN AND CONTINGENCIES - $5,000)
    16         (3)  SR 0070, I-70 WESTBOUND BRIDGE OVER SR
    17             3009, BUFFALO TOWNSHIP, BRIDGE
    18             PAINTING                                      148,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $143,000)
    21             (DESIGN AND CONTINGENCIES - $5,000)
    22         (4)  SR 0070, I-70 EASTBOUND BRIDGE OVER SR
    23             3009, BUFFALO TOWNSHIP, BRIDGE
    24             PAINTING                                      163,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $158,000)
    27             (DESIGN AND CONTINGENCIES - $5,000)
    28         (5)  SR 0070, I-70 BRIDGE OVER 8TH STREET,
    29             DONEGAL TOWNSHIP, BRIDGE REPLACEMENT        2,486,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19950H1931B2471                 - 91 -

     1             $2,211,000)
     2             (LAND ALLOCATION - $25,000)
     3             (DESIGN AND CONTINGENCIES - $250,000)
     4         (6)  SR 0070, I-70 BRIDGE OVER TURNBACK
     5             ROAD, SOUTH STRABANE TOWNSHIP, BRIDGE
     6             REHABILITATION                                990,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $750,000)
     9             (LAND ALLOCATION - $40,000)
    10             (DESIGN AND CONTINGENCIES - $200,000)
    11         (7)  SR 0070, I-70 BRIDGE OVER SR 0519,
    12             SOMERSET TOWNSHIP, BRIDGE
    13             REHABILITATION                              2,000,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $1,720,000)
    16             (LAND ALLOCATION - $40,000)
    17             (DESIGN AND CONTINGENCIES - $240,000)
    18         (8)  SR 0070, I-70 BRIDGE OVER SR 2017,
    19             SOMERSET TOWNSHIP, BRIDGE
    20             REHABILITATION                              1,105,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $865,000)
    23             (LAND ALLOCATION - $40,000)
    24             (DESIGN AND CONTINGENCIES - $200,000)
    25         (9)  SR 0088, CHARLEROI BRIDGE OVER MAPLE
    26             CREEK, CHARLEROI AND SPEERS BOROUGHS,
    27             BRIDGE REPLACEMENT                            725,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $500,000)
    30             (LAND ALLOCATION - $25,000)
    19950H1931B2471                 - 92 -

     1             (DESIGN AND CONTINGENCIES - $200,000)
     2         (10)  SR 0088, BRIDGE OVER PETERS CREEK,
     3             FINLEYVILLE BOROUGH, BRIDGE PAINTING           65,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $65,000)
     6         (11)  SR 0917, PIGEON CREEK BRIDGE OVER
     7             BRANCH OF PIGEON CREEK, BENTLEYVILLE
     8             BOROUGH, BRIDGE REPLACEMENT                   570,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $370,000)
    11             (LAND ALLOCATION - $25,000)
    12             (DESIGN AND CONTINGENCIES - $175,000)
    13         (12)  SR 1005, BRIDGE OVER MILLERS RUN,
    14             CECIL TOWNSHIP, BRIDGE PAINTING                75,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $75,000)
    17         (13)  SR 1022, DONORA WEBSTER BRIDGE OVER
    18             MONONGAHELA RIVER AND CONRAIL, DONORA
    19             BOROUGH, BRIDGE REPLACEMENT                20,000,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $15,000,000)
    22             (LAND ALLOCATION - $3,000,000)
    23             (DESIGN AND CONTINGENCIES - $2,000,000)
    24         (14)  SR 1077, DONORA-MONESSEN BRIDGE OVER
    25             MONONGAHELA RIVER, PA 837 AND 906 AND
    26             RAILROAD, DONORA BOROUGH, BRIDGE
    27             PAINTING                                    1,000,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $1,000,000)
    30         (15)  SR 2005, SOWERS RUN BRIDGE OVER
    19950H1931B2471                 - 93 -

     1             SOWERS RUN, AMWELL TOWNSHIP, BRIDGE
     2             REPLACEMENT                                   435,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $235,000)
     5             (LAND ALLOCATION - $25,000)
     6             (DESIGN AND CONTINGENCIES - $175,000)
     7         (16)  SR 2011, BRIDGE OVER BRANCH OF LITTLE
     8             TENMILE CREEK, WEST BETHLEHEM TOWNSHIP,
     9             BRIDGE REPLACEMENT                            460,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $260,000)
    12             (LAND ALLOCATION - $25,000)
    13             (DESIGN AND CONTINGENCIES - $175,000)
    14         (17)  SR 2030, GORBY'S BRIDGE II OVER GORBY
    15             RUN, CALIFORNIA BOROUGH, BRIDGE
    16             REHABILITATION                                300,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $300,000)
    19         (18)  SR 2037, MAPLE CREEK BRIDGE OVER
    20             BRANCH OF MAPLE CREEK, FALLOWFIELD
    21             TOWNSHIP, BRIDGE REPLACEMENT                  486,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $286,000)
    24             (LAND ALLOCATION - $25,000)
    25             (DESIGN AND CONTINGENCIES - $175,000)
    26         (19)  SR 3009, BUFFALO ARCH BRIDGE OVER
    27             BRANCH OF BUFFALO CREEK AND RAILROAD,
    28             BUFFALO TOWNSHIP, BRIDGE REPLACEMENT          535,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $300,000)
    19950H1931B2471                 - 94 -

     1             (LAND ALLOCATION - $10,000)
     2             (DESIGN AND CONTINGENCIES - $225,000)
     3         (20)  SR 4015, BRIDGE OVER CHERRY RUN,
     4             MOUNT PLEASANT TOWNSHIP, BRIDGE
     5             PAINTING                                       53,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $51,000)
     8             (DESIGN AND CONTINGENCIES - $2,000)
     9         (21)  SR 4022, CHARTIERS CREEK BRIDGE NO.2
    10             OVER BRANCH OF CHARTIERS CREEK, CANTON
    11             TOWNSHIP, BRIDGE REPLACEMENT                  415,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $215,000)
    14             (LAND ALLOCATION - $25,000)
    15             (DESIGN AND CONTINGENCIES - $175,000)
    16         (22)  SR 4022, CHARTIERS CREEK BRIDGE NO.1
    17             OVER BRANCH OF CHARTIERS CREEK, CANTON
    18             TOWNSHIP, BRIDGE REPLACEMENT                  405,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $205,000)
    21             (LAND ALLOCATION - $25,000)
    22             (DESIGN AND CONTINGENCIES - $175,000)
    23  SECTION 68.  WAYNE COUNTY.
    24     (A)  LOCAL BRIDGES (RESERVED)
    25     (B)  STATE BRIDGES
    26         (1)  SR 0371, COCHECTON BRIDGE NO.6 OVER
    27             DELAWARE RIVER, DAMASCUS TOWNSHIP,
    28             BRIDGE REHABILITATION                       1,050,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $950,000)
    19950H1931B2471                 - 95 -

     1             (DESIGN AND CONTINGENCIES - $100,000)
     2         (2)  SR 0380, I-380 BRIDGE OVER LEHIGH
     3             RIVER, LEHIGH TOWNSHIP, BRIDGE
     4             REHABILITATION                                284,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $244,000)
     7             (DESIGN AND CONTINGENCIES - $40,000)
     8         (3)  SR 4009, QUARRY BRIDGE OVER DYBERRY
     9             CREEK, DYBERRY TOWNSHIP, BRIDGE
    10             REPLACEMENT                                   660,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $500,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $150,000)
    15         (4)  SR 0371, BRIDGE NO.6, DAMASCUS
    16             TOWNSHIP, BRIDGE PAINTING                   2,200,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $2,000,000)
    19             (DESIGN AND CONTINGENCIES - $200,000)
    20         (5)  SR 1020, BRIDGE NO.7 OVER DELAWARE
    21             RIVER, DAMASCUS TOWNSHIP, BRIDGE
    22             PAINTING                                    3,300,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $3,000,000)
    25             (DESIGN AND CONTINGENCIES - $300,000)
    26         (6)  SR 1004, BRIDGE OVER OUTLET OF BEACH
    27             LAKE, INTERSECTION OF SR 1011, BERLIN
    28             TOWNSHIP, BRIDGE REPLACEMENT                  345,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $265,000)
    19950H1931B2471                 - 96 -

     1             (LAND ALLOCATION - $10,000)
     2             (DESIGN AND CONTINGENCIES - $70,000)
     3         (7)  SR 3028, BRIDGE OVER TR 191, EAST OF
     4             SR 3031, CHERRY RIDGE TOWNSHIP, BRIDGE
     5             REPLACEMENT                                   450,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $350,000)
     8             (LAND ALLOCATION - $10,000)
     9             (DESIGN AND CONTINGENCIES - $90,000)
    10         (8)  STATE BRIDGES, COUNTYWIDE BRIDGE ZONE
    11             PAINTING, BRIDGE PAINTING                     370,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $350,000)
    14             (LAND ALLOCATION - $10,000)
    15             (DESIGN AND CONTINGENCIES - $10,000)
    16  SECTION 69.  WESTMORELAND COUNTY.
    17     (A)  LOCAL BRIDGES
    18         (1)  HEMPFIELD TOWNSHIP, AIRPORT HILL ROAD
    19             BRIDGE OVER SLATE CREEK, BRIDGE
    20             REPLACEMENT                                   350,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $280,000)
    23             (LAND ALLOCATION - $10,000)
    24             (DESIGN AND CONTINGENCIES - $60,000)
    25         (2)  HEMPFIELD TOWNSHIP, SWEITZER ROAD
    26             BRIDGE OVER SEWICKLEY CREEK, BRIDGE
    27             REPLACEMENT                                   975,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $800,000)
    30             (LAND ALLOCATION - $15,000)
    19950H1931B2471                 - 97 -

     1             (DESIGN AND CONTINGENCIES - $160,000)
     2         (3)  HEMPFIELD TOWNSHIP, LADYSMITH ROAD
     3             BRIDGE OVER LITTLE SEWICKLEY CREEK,
     4             BRIDGE REPLACEMENT                            610,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $500,000)
     7             (LAND ALLOCATION - $10,000)
     8             (DESIGN AND CONTINGENCIES - $100,000)
     9         (4)  HEMPFIELD TOWNSHIP, OLD ROUTE 30
    10             BRIDGE OVER SLATE CREEK, BRIDGE
    11             REPLACEMENT                                   370,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $300,000)
    14             (LAND ALLOCATION - $10,000)
    15             (DESIGN AND CONTINGENCIES - $60,000)
    16         (5)  HEMPFIELD TOWNSHIP, OLD ROUTE 119
    17             BRIDGE OVER TRIBUTARY OF JACKS RUN,
    18             BRIDGE REPLACEMENT                            400,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $280,000)
    21             (LAND ALLOCATION - $20,000)
    22             (DESIGN AND CONTINGENCIES - $100,000)
    23         (6)  JEANETTE CITY, 6TH STREET BRIDGE OVER
    24             BRUSH CREEK, BRIDGE REPLACEMENT               460,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $340,000)
    27             (LAND ALLOCATION - $20,000)
    28             (DESIGN AND CONTINGENCIES - $100,000)
    29         (7)  LIGONIER TOWNSHIP, T-605 BRIDGE OVER
    30             TWO MILE RUN, BRIDGE REPLACEMENT              320,000
    19950H1931B2471                 - 98 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $200,000)
     3             (LAND ALLOCATION - $20,000)
     4             (DESIGN AND CONTINGENCIES - $100,000)
     5         (8)  LIGONIER TOWNSHIP, T-617, BRIDGE OVER
     6             MILL RUN, BRIDGE REPLACEMENT                  310,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $190,000)
     9             (LAND ALLOCATION - $20,000)
    10             (DESIGN AND CONTINGENCIES - $100,000)
    11         (9)  HEMPFIELD TOWNSHIP, POSSUM HOLLOW ROAD
    12             BRIDGE OVER TRIBUTARY OF LITTLE
    13             SEWICKLEY CREEK, BRIDGE REPLACEMENT           300,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $180,000)
    16             (LAND ALLOCATION - $20,000)
    17             (DESIGN AND CONTINGENCIES - $100,000)
    18         (10)  SOUTH HUNTINGTON TOWNSHIP, T-390,
    19             WILLIAMS ROAD BRIDGE, BRIDGE
    20             REPLACEMENT                                   125,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $100,000)
    23             (LAND ALLOCATION - $5,000)
    24             (DESIGN AND CONTINGENCIES - $20,000)
    25         (11)  SOUTH HUNTINGTON TOWNSHIP, T-562,
    26             J.D. SMITH ROAD BRIDGE, BRIDGE
    27             REPLACEMENT                                   155,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $125,000)
    30             (LAND ALLOCATION - $5,000)
    19950H1931B2471                 - 99 -

     1             (DESIGN AND CONTINGENCIES - $25,000)
     2         (12)  SOUTH HUNTINGTON TOWNSHIP, T-386,
     3             BRIDGE NO. 1, MOUNT ETNA ROAD BRIDGE,
     4             BRIDGE REPLACEMENT                            145,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $115,000)
     7             (LAND ALLOCATION - $5,000)
     8             (DESIGN AND CONTINGENCIES - $25,000)
     9         (13)  SOUTH HUNTINGTON TOWNSHIP, T-386,
    10             BRIDGE NO.2, MOUNT ETNA ROAD AT REMO
    11             ROAD, BRIDGE REPLACEMENT                      135,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $110,000)
    14             (LAND ALLOCATION - $5,000)
    15             (DESIGN AND CONTINGENCIES - $20,000)
    16         (14)  SOUTH HUNTINGTON TOWNSHIP, T-385,
    17             COMMER ROAD BRIDGE, BRIDGE REPLACEMENT        150,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $120,000)
    20             (LAND ALLOCATION - $5,000)
    21             (DESIGN AND CONTINGENCIES - $25,000)
    22         (15)  WASHINGTON TOWNSHIP, T-979, PLEASANT
    23             VIEW ROAD BRIDGE OVER BEAVER RUN,
    24             BRIDGE REPLACEMENT                            385,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $265,000)
    27             (LAND ALLOCATION - $20,000)
    28             (DESIGN AND CONTINGENCIES - $100,000)
    29     (B)  STATE BRIDGES
    30         (1)  SR 0030, MILL CREEK BRIDGE OVER MILL
    19950H1931B2471                 - 100 -

     1             CREEK, LIGONIER TOWNSHIP, BRIDGE
     2             REPLACEMENT                                   910,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $710,000)
     5             (LAND ALLOCATION - $25,000)
     6             (DESIGN AND CONTINGENCIES - $175,000)
     7         (2)  SR 0031, JACOBS CREEK BRIDGE OVER
     8             JACOBS CREEK, MOUNT PLEASANT AND
     9             BULLSKIN TOWNSHIPS, BRIDGE REPLACEMENT        715,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $500,000)
    12             (LAND ALLOCATION - $40,000)
    13             (DESIGN AND CONTINGENCIES - $175,000)
    14         (3)  SR0056, SEWARD BRIDGE OVER CONRAIL AND
    15             LOCAL ROAD, ST. CLAIR TOWNSHIP, BRIDGE
    16             PAINTING                                      600,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $600,000)
    19         (4)  SR 0070, I-70 BRIDGE OVER N&W
    20             RAILROAD, ROSTRAVER TOWNSHIP, BRIDGE
    21             REHABILITATION                              1,565,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $1,305,000)
    24             (LAND ALLOCATION - $60,000)
    25             (DESIGN AND CONTINGENCIES - $200,000)
    26         (5)  SR 0070, I-70 BRIDGE OVER CONRAIL,
    27             SOUTH HUNTINGTON TOWNSHIP, BRIDGE
    28             REHABILITATION                              3,125,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $2,780,000)
    19950H1931B2471                 - 101 -

     1             (LAND ALLOCATION - $45,000)
     2             (DESIGN AND CONTINGENCIES - $300,000)
     3         (6)  SR 0119, CRABTREE CREEK BRIDGE NO.2
     4             OVER CRABTREE CREEK, HEMPFIELD
     5             TOWNSHIP, BRIDGE REPLACEMENT                  577,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $377,000)
     8             (LAND ALLOCATION - $25,000)
     9             (DESIGN AND CONTINGENCIES - $175,000)
    10         (7)  SR 0136, WEST NEWTON BRIDGE OVER
    11             YOUGHIOGHENY RIVER, WEST NEWTON
    12             BOROUGH, BRIDGE PAINTING                      250,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $250,000)
    15         (8)  SR 0259, BOLIVER UNDERPASS CONRAIL
    16             RAILROAD OVER SR 0259, FAIRFIELD
    17             TOWNSHIP, BRIDGE REPLACEMENT                  310,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $200,000)
    20             (LAND ALLOCATION - $10,000)
    21             (DESIGN AND CONTINGENCIES - $100,000)
    22         (9)  SR 0271, BRIDGE OVER MILL CREEK,
    23             LIGONIER TOWNSHIP, BRIDGE PAINTING             87,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $87,000)
    26         (10)  SR 0711, BRIDGE OVER MILL CREEK,
    27             LIGONIER TOWNSHIP, BRIDGE PAINTING            125,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $125,000)
    30         (11)  SR 0819, BRIDGE OVER STAUFFER BRIDGE,
    19950H1931B2471                 - 102 -

     1             SCOTTDALE BOROUGH, BRIDGE PAINTING             92,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $92,000)
     4         (12)  SR 0981, BRIDGE OVER BRANCH OF BARRON
     5             RUN, SOUTH HUNTINGTON TOWNSHIP, BRIDGE
     6             REPLACEMENT                                   250,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $250,000)
     9         (13)  SR 0982, BRADENVILLE BRIDGE OVER
    10             SAXMAN RUN, DERRY TOWNSHIP, BRIDGE
    11             REPLACEMENT                                   330,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $330,000)
    14         (14)  SR 1027, STONEY RUN BRIDGE OVER
    15             STONEY RUN, DERRY TOWNSHIP, BRIDGE
    16             REPLACEMENT                                   340,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $255,000)
    19             (LAND ALLOCATION - $10,000)
    20             (DESIGN AND CONTINGENCIES - $75,000)
    21         (15)  SR 2008, FOURMILE RUN BRIDGE OVER
    22             FOURMILE RUN, COOK TOWNSHIP, BRIDGE
    23             PAINTING                                       83,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $83,000)
    26         (16)  SR 2010, BRIDGE OVER BRANCH OF BOYER
    27             RUN, MOUNT PLEASANT TOWNSHIP, BRIDGE
    28             REPLACEMENT                                   450,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $250,000)
    19950H1931B2471                 - 103 -

     1             (LAND ALLOCATION - $25,000)
     2             (DESIGN AND CONTINGENCIES - $175,000)
     3         (17)  SR 8036, NEW STANTON RAMP BRIDGE OVER
     4             SR 3091, NEW STANTON BOROUGH, BRIDGE
     5             REHABILITATION                                475,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $395,000)
     8             (DESIGN AND CONTINGENCIES - $80,000)
     9  SECTION 70.  WYOMING COUNTY.
    10     (A)  LOCAL BRIDGES (RESERVED)
    11     (B)  STATE BRIDGES
    12         (1)  SR 3001, BRIDGE AT JUNCTION WITH SR
    13             4004 OVER BRANCH OF SUSQUEHANNA RIVER,
    14             WINDHAM TOWNSHIP, BRIDGE PAINTING              60,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $50,000)
    17             (DESIGN AND CONTINGENCIES - $10,000)
    18         (2)  STATE BRIDGES, COUNTYWIDE BRIDGE ZONE
    19             PAINTING, BRIDGE PAINTING                     370,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $350,000)
    22             (LAND ALLOCATION - $10,000)
    23             (DESIGN AND CONTINGENCIES - $10,000)
    24  SECTION 71.  YORK COUNTY.
    25     (A)  LOCAL BRIDGES
    26         (1)  CARROLL TOWNSHIP, GETTYSBURG ROAD
    27             BRIDGE OVER YELLOW BREECHES CREEK,
    28             BRIDGE REPLACEMENT                            860,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $700,000)
    19950H1931B2471                 - 104 -

     1             (LAND ALLOCATION - $10,000)
     2             (DESIGN AND CONTINGENCIES - $150,000)
     3     (B)  STATE BRIDGES (RESERVED)
     4  Section 72.  Limitation on expenditure of funds.
     5     Any moneys derived from the incurring of debt shall be used
     6  solely for effecting the rehabilitation, replacement or removal
     7  of bridges located on State highways. All other bridge
     8  rehabilitation, replacement or removal shall be financed and
     9  State bridge rehabilitation, replacement or removal may also be
    10  financed from current revenue.
    11  Section 73.  Debt authorization.
    12     The Governor, Auditor General and State Treasurer are hereby
    13  authorized and directed to borrow from time to time, in addition
    14  to any authorization heretofore or hereafter enacted, on the
    15  credit of the Commonwealth, subject to the limitations provided
    16  in the current capital budget, money not exceeding in the
    17  aggregate the sum of $333,723,000 as may be found necessary to
    18  carry out the acquisition and construction of the State highway
    19  projects specifically itemized in this act.
    20  Section 74.  Issue of bonds.
    21     The indebtedness authorized in this act shall be incurred
    22  from time to time and shall be evidenced by one or more series
    23  of general obligation bonds of the Commonwealth in such
    24  aggregate principal amount for each series as the Governor,
    25  Auditor General and State Treasurer shall determine, but the
    26  latest stated maturity date shall not exceed 30 years from the
    27  date of the bond first issued for each series.
    28  Section 75.  Estimated useful life of projects.
    29     The General Assembly states the estimated useful life of the
    30  projects itemized in this act as 30 years.
    19950H1931B2471                 - 105 -

     1  Section 76.  Appropriation.
     2     The net proceeds of the sale of the obligations authorized in
     3  this act are hereby appropriated from the Capital Facilities
     4  Fund to the department in the maximum amount of $333,723,000 to
     5  be used by it exclusively to defray the financial costs of the
     6  State projects specifically itemized in this capital budget.
     7  After reserving or paying the expenses of the sale of the
     8  obligation, the State Treasurer shall pay out to the department
     9  the moneys as required and certified by it to be legally due and
    10  payable.
    11  Section 77.  Federal funds.
    12     In addition to those funds appropriated in section 76, all
    13  moneys received from the Federal Government for the public
    14  improvement projects specifically itemized in this act are also
    15  hereby appropriated for those projects.
    16  Section 78.  Allocation of funds.
    17     (a)  General rule.--Whenever the department determines that
    18  the full estimated financial costs of the projects itemized in
    19  this act are not necessary for the proper design, acquisition or
    20  construction of such projects, the excess funds no longer
    21  required may be allocated by the department to increase the
    22  estimated costs of any one or more of the projects specifically
    23  itemized in a capital budget.
    24     (b)  Reimbursement of municipal expenditures.--Moneys raised
    25  or expended by municipalities after the effective date of this
    26  act, in anticipation of receipt of funds authorized for projects
    27  itemized by this act, may be reimbursable to those
    28  municipalities.
    29  Section 79.  Policy on jobs and materials.
    30     (a)  Jobs.--It is the declared policy of the Commonwealth
    19950H1931B2471                 - 106 -

     1  that the construction projects authorized in this act be used,
     2  to the greatest extent possible, to provide for the creation of
     3  jobs and the rehiring of the unemployed in this Commonwealth. In
     4  order to reach this goal, firms with Commonwealth-based
     5  facilities shall be actively solicited to make bids on contracts
     6  to furnish products and materials, including, but not limited
     7  to, steel and steel products, to be used in these projects.
     8     (b)  Materials.--Every contract document entered into to
     9  undertake a project contained in this act shall provide that any
    10  steel or other products to be used or supplied in the
    11  performance of this contract shall be required to be
    12  manufactured by plants in the United States unless the secretary
    13  determines, on a contract by contract basis, that certain
    14  required products are not produced in the United States in
    15  sufficient quantities to meet the requirements of the contract.
    16  Such a determination and the reasons therefor shall be published
    17  in the Pennsylvania Bulletin. Decisions made under this
    18  subsection shall not be inconsistent with the general provisions
    19  of the act of March 3, 1978 (P.L.6, No.3), known as the Steel
    20  Products Procurement Act.
    21     (c)  Minorities and women.--It is also the declared policy of
    22  the Commonwealth to require and encourage substantial
    23  participation by minorities and women in the construction
    24  projects authorized by this act.
    25  Section 80.  Payment of capital debt service.
    26     The repayment of any debt incurred pursuant to this act shall
    27  be made from the account and such repayment shall have first
    28  claim on the revenues of the account.
    29  Section 81.  Authorization and debt cumulation.
    30     The additional authorization and debt allowance provided for
    19950H1931B2471                 - 107 -

     1  in this act shall be added to the total authorizations and debt
     2  incurred pursuant to the act of December 8, 1982 (P.L.848,
     3  No.235), known as the Highway-Railroad and Highway Bridge
     4  Capital Budget Act for 1982-1983, as amended and supplemented.
     5  SECTION 82.  EDITORIAL CHANGES.                                   <--
     6     IN EDITING AND PREPARING THIS ACT FOR PRINTING FOLLOWING THE
     7  FINAL ENACTMENT, THE LEGISLATIVE REFERENCE BUREAU SHALL INSERT
     8  OR REVISE LETTERS OR NUMBERS FOR PROJECTS WHERE THE LETTERS OR
     9  NUMBERS ARE MISSING OR REQUIRE REVISION. THE BUREAU SHALL ALSO
    10  REVISE THE TOTAL MONETARY AMOUNTS FOR THE TOTAL AUTHORIZATION,
    11  DEBT AUTHORIZATION, APPROPRIATIONS AND DEPARTMENTAL TOTALS AS
    12  NECESSARY TO AGREE WITH THE TOTAL MONETARY AMOUNTS OF THE
    13  PROJECTS.
    14  Section 82 83.  Effective date.                                   <--
    15     This act shall take effect immediately.










    F7L86RZ/19950H1931B2471         - 108 -