SENATE AMENDED
        PRIOR PRINTER'S NOS. 1956, 2077, 2196,        PRINTER'S NO. 2565
        2246, 2261, 2438, 2481, 2556

THE GENERAL ASSEMBLY OF PENNSYLVANIA


SENATE BILL

No. 1591 Session of 1994


        INTRODUCED BY STOUT AND CORMAN, FEBRUARY 15, 1994

        SENATE AMENDMENTS TO HOUSE AMENDMENTS, NOVEMBER 22, 1994

                                  A SUPPLEMENT

     1  To the act of June 28, 1993 (P.L.134, No.31), entitled "An act    <--
     2     providing for the capital budget for the fiscal year 1993-
     3     1994," itemizing Fiscal Year 1993-1994 TO THE ACT OF JUNE 16,  <--
     4     1994 (P.L.344, NO.50), ENTITLED "AN ACT PROVIDING FOR THE
     5     CAPITAL BUDGET FOR THE FISCAL YEAR 1994-1995," ITEMIZING AN
     6     ADDITIONAL FISCAL YEAR 1994-1995 PUBLIC IMPROVEMENT PROJECT,   <--
     7     ITEMIZING AN ADDITIONAL FISCAL YEAR 1994-1995 REDEVELOPMENT
     8     ASSISTANCE PROJECT AND ITEMIZING FISCAL YEAR 1994-1995
     9     capital budget projects in the categories of highway and
    10     airport projects to be constructed or acquired by the
    11     DEPARTMENT OF ENVIRONMENTAL RESOURCES, THE DEPARTMENT OF       <--
    12     COMMUNITY AFFAIRS OR THE Department of Transportation,
    13     together with their estimated financial costs; stating the
    14     estimated useful life of the projects; MAKING AN               <--
    15     APPROPRIATION APPROPRIATIONS FOR THE ADDITIONAL PUBLIC         <--
    16     IMPROVEMENT PROJECT AND REDEVELOPMENT ASSISTANCE PROJECT;      <--
    17     AUTHORIZING THE INCURRING OF DEBT WITHOUT THE APPROVAL OF THE
    18     ELECTORS FOR THE PURPOSE OF FINANCING THE ADDITIONAL PUBLIC
    19     IMPROVEMENT PROJECT AND THE ADDITIONAL REDEVELOPMENT           <--
    20     ASSISTANCE PROJECT; and making a repeal.

    21     The General Assembly of the Commonwealth of Pennsylvania
    22  hereby enacts as follows:
    23  Section 1.  Short title.
    24     This act shall be known and may be cited as the Highway and    <--
    25  Airport Supplement to the Capital Budget Act of 1993-1994. FIRST  <--


     1  SUPPLEMENTAL CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 1994-
     2  1995.
     3  Section 2.  Total authorization.
     4     (A)  PUBLIC IMPROVEMENTS.--THE TOTAL AUTHORIZATION FOR THE     <--
     5  ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC
     6  IMPROVEMENT PROJECTS ITEMIZED IN SECTION 2.1 AND TO BE ACQUIRED
     7  OR CONSTRUCTED BY THE DEPARTMENT OF GENERAL SERVICES, ITS
     8  SUCCESSORS OR ASSIGNS, AND TO BE FINANCED BY THE INCURRING OF
     9  DEBT SHALL BE $3,600,000 $4,600,000.                              <--
    10     (B)  REDEVELOPMENT ASSISTANCE.--THE TOTAL AUTHORIZATION FOR    <--
    11  THE ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF REDEVELOPMENT
    12  ASSISTANCE AND REDEVELOPMENT ASSISTANCE CAPITAL PROJECTS
    13  ITEMIZED IN SECTION 2.2 FOR CAPITAL GRANTS BY THE DEPARTMENT OF
    14  COMMUNITY AFFAIRS, ITS SUCCESSORS OR ASSIGNS, AND TO BE FINANCED
    15  BY THE INCURRING OF DEBT, SHALL BE $6,000,000.
    16     (B) (C)  HIGHWAY AND AIRPORT PROJECTS.--The total              <--
    17  authorization for the capital projects IN THE CATEGORY OF         <--
    18  HIGHWAY AND AIRPORT PROJECTS itemized in this act and to be
    19  constructed by the Department of Transportation, its successors
    20  or assigns and to be financed from current revenues of the Motor
    21  License Fund shall be $1,527,598,000. $1,521,903,000.             <--
    22  SECTION 2.1.  ITEMIZATION OF PUBLIC IMPROVEMENT PROJECTS.
    23     ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC
    24  IMPROVEMENT PROJECTS TO BE CONSTRUCTED OR ACQUIRED BY THE
    25  DEPARTMENT OF GENERAL SERVICES, ITS SUCCESSORS OR ASSIGNS, AND
    26  TO BE FINANCED BY THE INCURRING OF DEBT, ARE HEREBY ITEMIZED,
    27  TOGETHER WITH THEIR RESPECTIVE ESTIMATED FINANCIAL COSTS, AS
    28  FOLLOWS:
    29                                                           TOTAL
    30                                                          PROJECT
    19940S1591B2565                  - 2 -

     1             PROJECT                                    ALLOCATION
     2  (1)  DEPARTMENT OF ENVIRONMENTAL RESOURCES            $3,600,000  <--
     3  (1)  DEPARTMENT OF ENVIRONMENTAL RESOURCES            $4,600,000  <--
     4     (I)  MONTGOMERY COUNTY
     5         (A)  GLENSIDE AREA, CHELTENHAM TOWNSHIP -
     6             RAISING LEVEL OF LEVEES ALONG TACONY
     7             CREEK, CONSTRUCTION OF A CONCRETE
     8             CHANNEL, EXTENSION OF CULVERT BOX AND
     9             CONSTRUCTION OF A NEW SEPTA RAILROAD
    10             BRIDGE FOR STREAM FLOW IMPROVEMENT          3,600,000
    11     (II)  LEBANON COUNTY                                           <--
    12         (A)  FLOOD CONTROL PROJECT LOCATED ON HAZEL
    13             DYKE BETWEEN STATE DRIVE BRIDGE AND
    14             LINCOLN AVENUE BRIDGE                       1,000,000
    15             (BASE PROJECT ALLOCATION - $800,000)
    16             (DESIGN AND CONTINGENCIES - $200,000)
    17  SECTION 2.2.  ITEMIZATION OF REDEVELOPMENT ASSISTANCE AND
    18                 REDEVELOPMENT ASSISTANCE CAPITAL PROJECTS.
    19     ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF REDEVELOPMENT
    20  ASSISTANCE AND REDEVELOPMENT ASSISTANCE CAPITAL PROJECTS TO BE
    21  CONSTRUCTED OR ACQUIRED BY THE DEPARTMENT OF COMMUNITY AFFAIRS,
    22  ITS SUCCESSORS OR ASSIGNS, AND TO BE FINANCED BY THE INCURRING
    23  OF DEBT ARE HEREBY ITEMIZED, TOGETHER WITH THEIR RESPECTIVE
    24  FINANCIAL COSTS AS FOLLOWS:
    25                                                           TOTAL
    26                                                          PROJECT
    27             PROJECT                                    ALLOCATION
    28  (1)  DEPARTMENT OF COMMUNITY AFFAIRS                  $6,000,000
    29     (I)  ALLEGHENY COUNTY
    30         (A)  CITY OF PITTSBURGH
    19940S1591B2565                  - 3 -

     1             (I)  CONSTRUCTION OF DUQUESNE
     2                 UNIVERSITY ENVIRONMENTAL RESEARCH
     3                 AND EDUCATION CENTER                    6,000,000
     4  Section 3.  Itemization of public highway projects.
     5     Additional capital projects in the category of public highway
     6  projects to be constructed by the Department of Transportation,
     7  its successors or assigns and to be financed from current
     8  revenues of the Motor License Fund are hereby itemized, together
     9  with their respective estimated financial costs in the following
    10  sections.
    11  Section 4.  Adams County
    12     (a)  PA 234 and PA 394
    13         (1)  Transportation Study                       1,200,000
    14             (Design and Contingencies - $1,200,000)
    15     (b)  US 30
    16         (1)  T-514 to Abbottstown, Widening             1,043,000
    17             (Base Project Allocation - $666,000)
    18             (Land Allocation - $324,000)
    19             (Design and Contingencies - $53,000)
    20         (2)  Gettysburg Line to US 15, Widening           800,000
    21             (Base Project Allocation - $600,000)
    22             (Land Allocation - $100,000)
    23             (Design and Contingencies - $100,000)
    24  Section 5.  Allegheny County
    25     (a)  PA 28
    26         (1)  Junction I-279 to New Kensington,
    27             Pavement Rehabilitation and Safety
    28             Improvements                                2,970,000
    29             (Base Project Allocation - $2,700,000)
    30             (Design and Contingencies - $270,000)
    19940S1591B2565                  - 4 -

     1         (2)  New Kensington to Butler County,
     2             Pavement Rehabilitation and Safety
     3             Improvements                                2,640,000
     4             (Base Project Allocation - $2,400,000)
     5             (Design and Contingencies - $240,000)
     6     (b)  PA 50
     7         (1)  Bridgeville Area, Corridor
     8             Improvements                                1,010,000
     9             (Base Project Allocation - $400,000)
    10             (Land Allocation - $70,000)
    11             (Design and Contingencies - $540,000)
    12     (c)  PA 51
    13         (1)  Payne Hill Road to Elliot Road, Median
    14             Barrier and Jughandle                         226,000
    15             (Base Project Allocation - $196,000)
    16             (Land Allocation - $14,000)
    17             (Design and Contingencies - $16,000)
    18         (2)  West End Bridge to Neville Island,
    19             Complete Upgrade and Safety
    20             Improvements                               12,000,000
    21         (3)  Reconstruction and Reconfiguration of
    22             Tunnel and Bridge Waterflow for Lewis
    23             Run Watershed, West Mifflin, Pleasant
    24             Hills, Jefferson and Large Boroughs        10,000,000
    25             (Base Project Allocation - $10,000,000)
    26     (d)  PA 60
    27         (1)  Junction US 22/30 to Beaver County
    28             Line, Pavement Rehabilitation and
    29             Safety Improvements                         3,960,000
    30             (Base Project Allocation - $3,600,000)
    19940S1591B2565                  - 5 -

     1             (Design and Contingencies - $360,000)
     2     (e)  PA 286
     3         (1)  US 22 to PA 380, Golden Mile Highway
     4             Widening and Rehabilitation                 2,600,000
     5             (Base Project Allocation - $2,000,000)
     6             (Land Allocation - $320,000)
     7             (Design and Contingencies - $280,000)
     8     (f)  SR 3104
     9         (1)  SR 65 to SR 51, Intersection
    10             Improvement                                   120,000
    11             (Base Project Allocation - $110,000)
    12             (Design and Contingencies - $10,000)
    13     (g)  I-79
    14         (1)  I-79 at SR 51, Interchange
    15             Improvement                                 1,392,000
    16             (Base Project Allocation - $1,200,000)
    17             (Land Allocation - $80,000)
    18             (Design and Contingencies - $112,000)
    19         (2)  Washington County Line to I-279,
    20             Pavement Rehabilitation and Safety
    21             Improvements                                1,485,000
    22             (Base Project Allocation - $1,350,000)
    23             (Design and Contingencies - $135,000)
    24         (3)  I-279 to Butler County, Pavement and
    25             Bridge Rehabilitation and Safety
    26             Improvements                                  165,000
    27             (Base Project Allocation - $150,000)
    28             (Design and Contingencies - $15,000)
    29         (4)  PA 60 to PA 51, Pavement and Bridge
    30             Rehabilitation and Safety Improvements        165,000
    19940S1591B2565                  - 6 -

     1             (Base Project Allocation - $150,000)
     2             (Design and Contingencies - $15,000)
     3     (h)  I-279
     4         (1)  I-79 to Poplar Street Bridge, Pavement
     5             and Bridge Rehabilitation and Safety
     6             Improvements                                  990,000
     7             (Base Project Allocation - $900,000)
     8             (Design and Contingencies - $90,000)
     9         (2)  I-279 Pedestrian Bridge and
    10             Facilities                                    118,000
    11             (Base Project Allocation - $100,000)
    12             (Design and Contingencies - $18,000)
    13         (3)  I-279 Retaining Wall in Ross Township,
    14             Safety Improvements                           950,000
    15             (Base Project Allocation - $700,000)
    16             (Design and Contingencies - $250,000)
    17     (i)  I-376
    18         (1)  Junction Pennsylvania Turnpike to I-
    19             279, Pavement Rehabilitation and Safety
    20             Improvements                                  440,000
    21             (Base Project Allocation - $400,000)
    22             (Design and Contingencies - $40,000)
    23     (j)  I-579
    24         (1)  PA 885 to I-279, Pavement
    25             Rehabilitation and Safety Improvements        220,000
    26             (Base Project Allocation - $200,000)
    27             (Design and Contingencies - $20,000)
    28     (k)  US 19
    29         (1)  West End Bridge Lane Control and
    30             Widening from Ramp to Leetsdale               600,000
    19940S1591B2565                  - 7 -

     1             (Base Project Allocation - $530,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $60,000)
     4         (2)  PA 51 to McFarland, Signal
     5             Improvement                                   178,000
     6             (Base Project Allocation - $160,000)
     7             (Design and Contingencies - $18,000)
     8     (l)  PA 909
     9         (1)  At Intersection with Entrance Drive,
    10             Reconstruction                                500,000
    11     (m)  SR 3004
    12         (1)  McMurray Road, Widen to Accommodate
    13             Left Turn Lane and Signal Installation        565,000
    14             (Base Project Allocation - $422,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $133,000)
    17     (n)  SR 3006
    18         (1)  Boyce Road at PA 19, Widen to
    19             Accommodate Left and Right Turn Lanes
    20             and Upgrade Signals                           506,000
    21             (Base Project Allocation - $400,000)
    22             (Land Allocation - $15,000)
    23             (Design and Contingencies - $91,000)
    24         (2)  Boyce Road at Hidden Valley Road,
    25             Widen to Accommodate Center Turn Lane         870,000
    26             (Base Project Allocation - $760,000)
    27             (Land Allocation - $20,000)
    28             (Design and Contingencies - $90,000)
    29     (o)  SR 0028
    30         (1)  At the 31st Street Bridge and Rialto
    19940S1591B2565                  - 8 -

     1             Street, Construct Elevated Roadway over
     2             Existing Intersection and Widen SR0028
     3             from the 31st Street Bridge to the
     4             Heinz Plant                                35,000,000
     5             (Base Project Allocation - $26,000,000)
     6             (Land Allocation - $2,000,000)
     7             (Design and Contingencies - $7,000,000)
     8     (p)  SR 2027
     9         (1)  Romine Avenue, Port Vue Borough,
    10             Improvement, Extension/Reconstruction          40,000
    11             (Base Project Allocation - $34,000)
    12             (Land Allocation - $2,000)
    13             (Design and Contingencies - $4,000)
    14     (q)  Port Vue Park Access
    15         (1)  Construct Access Road to Community
    16             Sports Complex                                 35,000
    17             (Base Project Allocation - $30,000)
    18             (Land Allocation - $1,000)
    19             (Design and Contingencies - $4,000)
    20     (r)  SR 2040
    21         (1)  Lebanon Church Road, Safety
    22             Improvements                                1,800,000
    23             (Base Project Allocation - $1,500,000)
    24             (Land Allocation - $200,000)
    25             (Design and Contingencies - $100,000)
    26     (s)  SR 0885 and SR 2108
    27         (1)  Boulevard of the Allies, Liberty
    28             Bridge Ramps to Parkway Ramps,
    29             Including Stabilization of Rock Slope,
    30             Repair or Replacement of Retaining Wall
    19940S1591B2565                  - 9 -

     1             and Rehabilitation or Replacement of
     2             Bridges                                    17,000,000
     3             (Base Project Allocation - $15,000,000)
     4             (Land Allocation - $1,000,000)
     5             (Design and Contingencies - $1,000,000)
     6     (t)  PA 48
     7         (1)  Restoration from PA 148 to Haymaker
     8             Road                                           46,000
     9             (Base Project Allocation - $33,000)
    10             (Land Allocation - $8,000)
    11             (Design and Contingencies - $5,000)
    12         (2)  Corridor Enhancements in City of
    13             McKeesport                                    100,000
    14             (Base Project Allocation - $100,000)
    15     (u)  PA 148
    16         (1)  Restoration of Walnut Street in City
    17             of McKeesport                               1,370,000
    18             (Base Project Allocation - $1,320,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $40,000)
    21  Section 6.  Armstrong County
    22     (a)  PA 28
    23         (1)  Butler County Line to US 422,
    24             Pavement, Bridge Rehabilitation and
    25             Safety Improvements                         2,640,000
    26             (Base Project Allocation - $2,400,000)
    27             (Design and Contingencies - $240,000)
    28         (2)  Kiddieland North, Roadway Widening and
    29             Reconstruction                              2,710,000
    30             (Base Project Allocation - $2,100,000)
    19940S1591B2565                 - 10 -

     1             (Land Allocation - $300,000)
     2             (Design and Contingencies - $310,000)
     3         (3)  B&O Railroad North, Roadway Widening
     4             and Reconstruction                          2,190,000
     5             (Base Project Allocation - $1,680,000)
     6             (Land Allocation - $210,000)
     7             (Design and Contingencies - $300,000)
     8         (4)  Route 28 and US 422, Allegheny Valley
     9             Expressway Restoration                      7,675,000
    10             (Base Project Allocation - $7,500,000)
    11             (Design and Contingencies - $175,000)
    12     (b)  PA 85
    13         (1)  Highway Reconstruction and
    14             Rehabilitation                              5,550,000
    15             (Base Project Allocation - $5,000,000)
    16             (Land Allocation - $250,000)
    17             (Design and Contingencies - $300,000)
    18     (c)  US 422
    19         (1)  Butler County Line East to Allegheny
    20             Valley Expressway                          10,675,000
    21             (Base Project Allocation - $10,500,000)
    22             (Design and Contingencies - $175,000)
    23  Section 7.  Beaver County
    24     (a)  PA 51
    25         (1)  Aliquippa through West Aliquippa,
    26             Restoration                                 3,600,000
    27     (b)  PA 60
    28         (1)  Allegheny County Line to PA 51,
    29             Pavement Rehabilitation and Safety
    30             Improvements                                5,610,000
    19940S1591B2565                 - 11 -

     1             (Base Project Allocation - $5,100,000)
     2             (Design and Contingencies - $510,000)
     3     (c)  PA 18
     4         (1)  9th Avenue to 32nd Street, Relocation        320,000
     5             (Base Project Allocation - $280,000)
     6             (Design and Contingencies - $40,000)
     7     (d)  11th Street
     8         (1)  Ambridge Borough, Bridge to Duss
     9             Avenue, Restoration                            50,000
    10             (Base Project Allocation - $45,000)
    11             (Design and Contingencies - $5,000)
    12     (e)  PA 351
    13         (1)  Beaver and Lawrence Counties, Elwood
    14             City to Beaver Valley Expressway,
    15             Widening and Restoration                    2,908,000
    16             (Base Project Allocation - $2,280,000)
    17             (Land Allocation - $400,000)
    18             (Design and Contingencies - $228,000)
    19     (f)  PA 51
    20         (1)  Constitution Boulevard, Hillside
    21             Benching and Safety Improvements            2,000,000
    22             (Base Project Allocation - $1,700,000)
    23             (Land Allocation - $100,000)
    24             (Design and Contingencies - $200,000)
    25  Section 8.  Bedford County
    26     (a)  I-70
    27         (1)  Fulton County Line to Pennsylvania
    28             Turnpike, Pavement Rehabilitation and
    29             Safety Improvements                           660,000
    30             (Base Project Allocation - $600,000)
    19940S1591B2565                 - 12 -

     1             (Design and Contingencies - $60,000)
     2  Section 9.  Berks County
     3     (a)  SR 3055
     4         (1)  Park Road Expressway, Pavement and
     5             Bridge Rehabilitation and Safety
     6             Improvements                                3,760,000
     7             (Base Project Allocation - $3,500,000)
     8             (Land Allocation - $80,000)
     9             (Design and Contingencies - $180,000)
    10         (2)  Outer Bypass Rehabilitation, PA 61 to
    11             the End of Expressway, Rehabilitation       4,400,000
    12             (Base Project Allocation - $2,400,000)
    13             (Land Allocation - $1,000,000)
    14             (Design and Contingencies - $1,000,000)
    15     (b)  SR 222
    16         (1)  Intersection with SR 73, Intersection
    17             Improvements                                  700,000
    18             (Base Project Allocation - $500,000)
    19             (Land Allocation - $100,000)
    20             (Design and Contingencies - $100,000)
    21         (2)  Intersection with SR 662, Signal
    22             Upgrade                                       100,000
    23             (Base Project Allocation - $90,000)
    24             (Design and Contingencies - $10,000)
    25     (c)  SR 183
    26         (1)  Intersection with SR 222, Widen Ramps
    27             and Add Acceleration and Deceleration
    28             Lanes on SR 222                             3,000,000
    29         (2)  Intersection with SR 3055, Widen
    30             Bridge and Reconstruct Interchange          5,000,000
    19940S1591B2565                 - 13 -

     1             (Base Project Allocation - $3,500,000)
     2             (Land Allocation - $750,000)
     3             (Design and Contingencies - $750,000)
     4     (d)  SR 2033
     5         (1)  Shelbourne Road TR 422 and TR 562,
     6             Realignment                                 1,000,000
     7     (e)  PA 61
     8         (1)  SR 3055 to Schuylkill County Line, Add
     9             Lanes, Resurface and Shoulder
    10             Construction                               20,000,000
    11         (2)  SR 3055 to US 222, Widen Highway,
    12             Abolish Existing Railroad Overpass and
    13             Construct New Overpass                     20,000,000
    14     (f)  PA 737
    15         (1)  SR 222 to I-78, Widen and Reconstruct      3,000,000
    16     (g)  I-78
    17         (1)  Lebanon County Line to 0.5 Miles East
    18             of Frystown, Rehabilitation and Safety
    19             Improvements                                  380,000
    20             (Base Project Allocation - $345,000)
    21             (Design and Contingencies - $35,000)
    22         (2)  Hamburg to Lehigh County, Pavement and
    23             Bridge Rehabilitation and Safety
    24             Improvements                                2,310,000
    25             (Base Project Allocation - $2,100,000)
    26             (Design and Contingencies - $210,000)
    27     (h)  I-176
    28         (1)  Lancaster County Line to US 422,
    29             Pavement Rehabilitation and Safety
    30             Improvements                                1,815,000
    19940S1591B2565                 - 14 -

     1             (Base Project Allocation - $1,650,000)
     2             (Design and Contingencies - $165,000)
     3     (i)  SR 422
     4         (1)  Penn Avenue Corridor Signal Upgrade,
     5             Wyomissing Hills, West Lawn and Sinking
     6             Springs Borough and Spring Township           450,000
     7             (Base Project Allocation - $405,000)
     8             (Design and Contingencies - $45,000)
     9  Section 10.  Blair County
    10     (a)  PA 36
    11         (1)  Intersection with Classon Lane,
    12             Intersection Improvements                     300,000
    13             (Base Project Allocation - $200,000)
    14             (Land Allocation - $50,000)
    15             (Design and Contingencies - $50,000)
    16     (b)  PA 866
    17         (1)  Martinsburg to Williamsburg,
    18             Preliminary Engineering Study                  62,000
    19             (Design and Contingencies - $62,000)
    20     (c)  US 22
    21         (1)  Intersections with SR 1011 and T-444,
    22             Intersection Improvements                     146,000
    23             (Base Project Allocation - $105,000)
    24             (Land Allocation - $30,000)
    25             (Design and Contingencies - $11,000)
    26         (2)  Intersection of US 22 and PA 866,
    27             Intersection Improvements                     105,000
    28             (Base Project Allocation - $50,000)
    29             (Land Allocation - $5,000)
    30             (Design and Contingencies - $50,000)
    19940S1591B2565                 - 15 -

     1         (3)  Yellow Springs to 1 Mile West of
     2             Yellow Springs, Truck Climbing Lane           307,000
     3             (Base Project Allocation - $173,000)
     4             (Land Allocation - $34,000)
     5             (Design and Contingencies - $100,000)
     6     (d)  US 220
     7         (1)  Intersection with SR 4010 and McMahon
     8             Drive, Intersection Improvements                8,000
     9             (Base Project Allocation - $6,000)
    10             (Land Allocation - $1,000)
    11             (Design and Contingencies - $1,000)
    12     (e)  Chestnut Avenue Extension
    13         (1)  Widen and Reconstruct from Fourth
    14             Street, City of Altoona to Interchange
    15             with SR 220, Pinecroft, Antis Township     51,000,000
    16             (Base Project Allocation - $45,000,000)
    17             (Land Allocation - $3,000,000)
    18             (Design and Contingencies - $3,000,000)
    19  Section 11.  Bradford County
    20     (a)  SR 14
    21         (1)  Alba Borough North to Troy Borough,
    22             Reconstruct                                   400,000
    23             (Base Project Allocation - $320,000)
    24             (Land Allocation - $40,000)
    25             (Design and Contingencies - $40,000)
    26  Section 12.  Bucks County
    27     (a)  PA 132
    28         (1)  Bustleton Avenue (PA 532) to Stump
    29             Bridge, and Morning Glory Drive to
    30             William Penn Drive, Safety Improvements
    19940S1591B2565                 - 16 -

     1             and Restoration                               484,000
     2             (Base Project Allocation - $314,000)
     3             (Land Allocation - $120,000)
     4             (Design and Contingencies - $50,000)
     5     (b)  I-95
     6         (1)  Neshaminy Creek to New Jersey State
     7             Line, Rehabilitation and Safety
     8             Improvements                                1,485,000
     9             (Base Project Allocation - $1,350,000)
    10             (Design and Contingencies - $135,000)
    11     (c)  US 1
    12         (1)  PA 132 to Junction I-95, Pavement and
    13             Bridge Rehabilitation and Safety
    14             Improvements                                3,300,000
    15             (Base Project Allocation - $3,000,000)
    16             (Design and Contingencies - $300,000)
    17         (2)  Junction I-95 to New Jersey State
    18             Line, Pavement/Bridge Rehabilitation
    19             and Safety Improvements                     2,970,000
    20             (Base Project Allocation - $2,700,000)
    21             (Design and Contingencies - $270,000)
    22     (d)  US 13
    23         (1)  Penn Valley Road to US 1, Pavement and
    24             Bridge Rehabilitation and Safety
    25             Improvements                                3,780,000
    26             (Base Project Allocation - $3,500,000)
    27             (Land Allocation - $80,000)
    28             (Design and Contingencies - $200,000)
    29         (2)  Levittown Parkway to Penn Valley,
    30             Pavement and Bridge Rehabilitation and
    19940S1591B2565                 - 17 -

     1             Safety Improvements                         3,740,000
     2             (Base Project Allocation - $3,500,000)
     3             (Land Allocation - $40,000)
     4             (Design and Contingencies - $200,000)
     5     (e)  SR 2002
     6         (1)  North Radcliffe Street, Resurface and
     7             Miscellaneous Improvements                  2,400,000
     8             (Base Project Allocation - $2,000,000)
     9             (Land Allocation - $200,000)
    10             (Design and Contingencies - $200,000)
    11     (f)  SR 2051
    12         (1)  Levittown Parkway, Superelevation of
    13             Levittown Parkway, Construction of
    14             Median Barriers and Drainage
    15             Improvements                                  810,000
    16             (Base Project Allocation - $810,000)
    17  Section 13.  Butler County
    18     (a)  PA 28
    19         (1)  Allegheny County Line to Armstrong
    20             County, Pavement, Bridge Rehabilitation
    21             and Safety Improvements                       880,000
    22             (Base Project Allocation - $800,000)
    23             (Design and Contingencies - $80,000)
    24     (b)  I-79
    25         (1)  Allegheny County Line to PA 108,
    26             Pavement Rehabilitation and Safety
    27             Improvements                                4,455,000
    28             (Base Project Allocation - $4,050,000)
    29             (Design and Contingencies - $405,000)
    30     (c)  US 422
    19940S1591B2565                 - 18 -

     1         (1)  I-79 to SR 4005, Pavement and Bridge
     2             Rehabilitation and Safety Improvements      1,130,000
     3             (Base Project Allocation - $1,110,000)
     4             (Design and Contingencies - $20,000)
     5  Section 14.  Cambria County
     6     (a)  PA 56
     7         (1)  Kernville Viaduct Rehabilitation             355,000
     8             (Base Project Allocation - $300,000)
     9             (Land Allocation - $5,000)
    10             (Design and Contingencies - $50,000)
    11         (2)  Expressway Bridge Rehabilitation             795,000
    12             (Base Project Allocation - $500,000)
    13             (Land Allocation - $35,000)
    14             (Design and Contingencies - $260,000)
    15     (b)  SR 1008
    16         (1)  Intersection with SR 4021,
    17             Intersection Improvements                     600,000
    18             (Base Project Allocation - $500,000)
    19             (Design and Contingencies - $100,000)
    20     (c)  SR 4021
    21         (1)  Hastings Area Industrial Park, Access
    22             Road from SR 4021 to Industrial Park        1,300,000
    23             (Base Project Allocation - $1,200,000)
    24             (Design and Contingencies - $100,000)
    25     (d)  PA 53
    26         (1)  Lilly Borough, Safety Improvements           126,000
    27             (Base Project Allocation - $60,000)
    28             (Land Allocation - $60,000)
    29             (Design and Contingencies - $6,000)
    30  Section 15.  Cameron County (Reserved)
    19940S1591B2565                 - 19 -

     1  Section 16.  Carbon County
     2     (a)  PA 902
     3         (1)  Lehighton Borough, Heintzelman's
     4             Curve, Transportation Study                   100,000
     5             (Design and Contingencies - $100,000)
     6     (b)  I-80
     7         (1)  Construct Weigh Station at Rest Area          55,000
     8             (Base Project Allocation - $50,000)
     9             (Design and Contingencies - $5,000)
    10         (2)  PA 940 to Lake Harmony, Pavement and
    11             Bridge Rehabilitation and Safety
    12             Improvements                                1,650,000
    13             (Base Project Allocation - $1,500,000)
    14             (Design and Contingencies - $150,000)
    15  Section 17.  Centre County
    16     (a)  PA 504
    17         (1)  From Cold Stream Bridge toward
    18             Airport, Two-Lane
    19             Relocation/Reconstruction                     400,000
    20             (Base Project Allocation - $240,000)
    21             (Land Allocation - $60,000)
    22             (Design and Contingencies - $100,000)
    23         (2)  Airport Road Restoration                  20,050,000
    24             (Base Project Allocation - $19,000,000)
    25             (Land Allocation - $250,000)
    26             (Design and Contingencies - $800,000)
    27     (b)  SR 1008
    28         (1)  Wilson Street to North Allegheny
    29             Street, Reconstruct Road                    1,600,000
    30             (Base Project Allocation - $1,500,000)
    19940S1591B2565                 - 20 -

     1             (Design and Contingencies - $100,000)
     2     (c)  I-80
     3         (1)  Yarnell to Clinton County Line,
     4             Pavement and Bridge Rehabilitation and
     5             Safety Improvements                         1,485,000
     6             (Base Project Allocation - $1,400,000)
     7             (Design and Contingencies - $85,000)
     8         (2)  Clearfield County Line to Yarnell,
     9             Pavement and Bridge Rehabilitation and
    10             Safety Improvements                         3,960,000
    11             (Base Project Allocation - $3,600,000)
    12             (Design and Contingencies - $360,000)
    13         (3)  Interchange with US 220 at Milesburg,
    14             Interchange Improvement                     1,160,000
    15             (Base Project Allocation - $1,100,000)
    16             (Design and Contingencies - $60,000)
    17         (4)  Interchange with PA 26 at Bellefonte,
    18             Interchange Improvement                     1,560,000
    19             (Base Project Allocation - $1,500,000)
    20             (Design and Contingencies - $60,000)
    21     (d)  US 322
    22         (1)  Port Matilda to Rush Township,
    23             Pavement and Safety Improvements              740,000
    24             (Base Project Allocation - $720,000)
    25             (Design and Contingencies - $20,000)
    26         (2)  Mount Nittany Expressway, Pavement and
    27             Bridge Rehabilitation and Safety
    28             Improvements                                1,300,000
    29             (Base Project Allocation - $1,280,000)
    30             (Design and Contingencies - $20,000)
    19940S1591B2565                 - 21 -

     1         (3)  West of Intersection with Taylor Hill
     2             Road, Construct Center Two-Way Left
     3             Turn Lane                                     470,000
     4             (Base Project Allocation - $400,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $60,000)
     7         (4)  Eastbound to Intersection with Neff
     8             Road, Construct Left Turn Lane                280,000
     9             (Base Project Allocation - $230,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $40,000)
    12         (5)  Port Matilda Mountain Restoration          3,700,000
    13             (Base Project Allocation - $3,600,000)
    14             (Design and Contingencies - $100,000)
    15     (e)  Airport Road Connection
    16         (1)  Park Avenue to Fax Hill, New
    17             Construction                                6,800,000
    18             (Base Project Allocation - $6,000,000)
    19             (Land Allocation - $500,000)
    20             (Design and Contingencies - $300,000)
    21     (f)  Inner Loop
    22         (1)  West College and Circleville Road, New
    23             Construction                                2,450,000
    24             (Base Project Allocation - $1,950,000)
    25             (Land Allocation - $200,000)
    26             (Design and Contingencies - $300,000)
    27         (2)  Eastern Section, New Construction          1,850,000
    28             (Base Project Allocation - $1,500,000)
    29             (Land Allocation - $250,000)
    30             (Design and Contingencies - $100,000)
    19940S1591B2565                 - 22 -

     1     (g)  SR 1008
     2         (1)  Wilson Street to North Allegheny
     3             Street, Reconstruct Roadway                 1,600,000
     4             (Base Project Allocation - $1,500,000)
     5             (Design and Contingencies - $100,000)
     6     (h)  Climbing Lane
     7         (1)  Glasscity to South of Philipsburg,
     8             Climbing Lane                               8,649,000
     9             (Base Project Allocation - $7,280,000)
    10             (Land Allocation - $736,000)
    11             (Design and Contingencies - $633,000)
    12     (i)  SR 3022
    13         (1)  SR 26 to Curtain Road on University
    14             Drive, Restoration                          1,425,000
    15             (Base Project Allocation - $1,300,000)
    16             (Land Allocation - $25,000)
    17             (Design and Contingencies - $100,000)
    18  Section 18.  Chester County
    19     (a)  PA 113
    20         (1)  PA 100 to Pennsylvania Turnpike,
    21             Corridor Improvement                          330,000
    22             (Base Project Allocation - $330,000)
    23     (b)  US 1
    24         (1)  PA 472 to PA 896, Pavement
    25             Rehabilitation and Safety Improvements      3,800,000
    26             (Base Project Allocation - $1,800,000)
    27             (Land Allocation - $1,000,000)
    28             (Design and Contingencies - $1,000,000)
    29         (2)  PA 896 to PA 41, Pavement
    30             Rehabilitation and Safety Improvements      4,600,000
    19940S1591B2565                 - 23 -

     1             (Base Project Allocation - $2,600,000)
     2             (Land Allocation - $1,000,000)
     3             (Design and Contingencies - $1,000,000)
     4         (3)  PA 41 to Baltimore Pike, Pavement
     5             Rehabilitation and Safety Improvements      4,400,000
     6             (Base Project Allocation - $2,400,000)
     7             (Land Allocation - $1,000,000)
     8             (Design and Contingencies - $1,000,000)
     9     (c)  US 30
    10         (1)  PA 10 to Reeceville, Pavement and
    11             Bridge Rehabilitation and Safety
    12             Improvements                                8,480,000
    13             (Base Project Allocation - $7,800,000)
    14             (Land Allocation - $200,000)
    15             (Design and Contingencies - $480,000)
    16         (2)  Reeceville to Lincoln Highway,
    17             Pavement and Bridge Rehabilitation and
    18             Safety Improvements                         7,520,000
    19             (Base Project Allocation - $6,800,000)
    20             (Land Allocation - $320,000)
    21             (Design and Contingencies - $400,000)
    22         (3)  Whitford Road to US 202, Widen to Five
    23             Lanes                                      10,800,000
    24             (Base Project Allocation - $8,000,000)
    25             (Land Allocation - $2,000,000)
    26             (Design and Contingencies - $800,000)
    27         (4)  Airport Road, Corridor Capacity and
    28             Safety Improvements                         6,000,000
    29             (Base Project Allocation - $5,000,000)
    30             (Land Allocation - $500,000)
    19940S1591B2565                 - 24 -

     1             (Design and Contingencies - $500,000)
     2         (5)  PA 10 to US 30 Business Interchange
     3             and Median Work                            24,000,000
     4             (Base Project Allocation - $20,000,000)
     5             (Land Allocation - $2,000,000)
     6             (Design and Contingencies - $2,000,000)
     7     (d)  US 202
     8         (1)  Stanton to PA 100 Bypass, Pavement and
     9             Bridge Rehabilitation and Safety
    10             Improvements                                5,100,000
    11             (Base Project Allocation - $4,800,000)
    12             (Design and Contingencies - $300,000)
    13         (2)  PA 100 Bypass to PA 401, Pavement and
    14             Bridge Rehabilitation and Safety
    15             Improvements                                6,300,000
    16             (Base Project Allocation - $6,000,000)
    17             (Design and Contingencies - $300,000)
    18         (3)  PA 401 to PA 252, Pavement and Bridge
    19             Rehabilitation and Safety Improvements      7,620,000
    20             (Base Project Allocation - $7,200,000)
    21             (Land Allocation - $100,000)
    22             (Design and Contingencies - $320,000)
    23         (4)  Matlack Street to US 30, Widen and
    24             Reconstruct Ramps                          37,000,000
    25             (Base Project Allocation - $30,000,000)
    26             (Land Allocation - $4,000,000)
    27             (Design and Contingencies - $3,000,000)
    28     (e)  SR 322
    29         (1)  Business 322 Intersection, Realignment
    30             of Highland Road (T-444) at
    19940S1591B2565                 - 25 -

     1             Intersection, Relocate Copeland School
     2             Road (SR 3063), Reconstruct Taylor Mill
     3             Road Cul-de-sac                             1,900,000
     4             (Base Project Allocation - $1,500,000)
     5             (Land Allocation - $200,000)
     6             (Design and Contingencies - $200,000)
     7     (f)  PA 162
     8         (1)  Embreeville Road, Safety Improvements
     9             and Reconstruction from Star Gazers
    10             Road to Embreeville Mill                      770,000
    11             (Base Project Allocation - $500,000)
    12             (Land Allocation - $200,000)
    13             (Design and Contingencies - $70,000)
    14     (g)  PA 926
    15         (1)  Intersection with Parkersville Road
    16             Intersection, Roadway and Safety
    17             Improvements                                  450,000
    18             (Base Project Allocation - $320,000)
    19             (Land Allocation - $70,000)
    20             (Design and Contingencies - $60,000)
    21     (h)  SR 10570 3095                                             <--
    22         (1)  Brandywine Creek Road from Harvey's
    23             Bridge to PA 162, Reconstruction of
    24             Roadway and Safety Improvements               690,000
    25             (Base Project Allocation - $450,000)
    26             (Land Allocation - $180,000)
    27             (Design and Contingencies - $60,000)
    28     (i)  SR 0041
    29         (1)  Intersection with Route 796,
    30             Intersection Improvements, Widening and
    19940S1591B2565                 - 26 -

     1             Addition of Left Hand Turn Lanes            1,071,000
     2             (Base Project Allocation - $850,000)
     3             (Land Allocation - $60,000)
     4             (Design and Contingencies - $161,000)
     5  Section 19.  Clarion County
     6     (a)  I-80
     7         (1)  PA 66 to PA 68, Pavement
     8             Rehabilitation and Safety Improvements      1,560,000
     9             (Base Project Allocation - $1,500,000)
    10             (Design and Contingencies - $60,000)
    11  Section 20.  Clearfield County
    12     (a)  I-80
    13         (1)  Junction US 219 to Centre County Line,
    14             Pavement Rehabilitation and Safety
    15             Improvements                                5,445,000
    16             (Base Project Allocation - $4,950,000)
    17             (Design and Contingencies - $495,000)
    18     (b)  US 219
    19         (1)  Intersection with SR 4019, Widening
    20             and Signal Update                             188,000
    21             (Base Project Allocation - $138,000)
    22             (Land Allocation - $30,000)
    23             (Design and Contingencies - $20,000)
    24  Section 21.  Clinton County
    25     (a)  I-80
    26         (1)  Centre County Line to Union County,
    27             Roadway Rehabilitation and Safety
    28             Improvements                                3,960,000
    29             (Base Project Allocation - $3,600,000)
    30             (Design and Contingencies - $360,000)
    19940S1591B2565                 - 27 -

     1     (b)  US 220
     2         (1)  Salona to Avis, Pavement and Bridge
     3             Rehabilitation and Safety Improvements      1,770,000
     4             (Base Project Allocation - $1,720,000)
     5             (Design and Contingencies - $50,000)
     6  Section 22.  Columbia County
     7     (a)  I-80
     8         (1)  Montour County to Luzerne County,
     9             Pavement Rehabilitation and Safety
    10             Improvements                                3,300,000
    11             (Base Project Allocation - $3,000,000)
    12             (Design and Contingencies - $300,000)
    13  Section 23.  Crawford County
    14     (a)  I-79
    15         (1)  Interchange with TR 6 and US 322,
    16             Interchange Lighting                          100,000
    17             (Base Project Allocation - $90,000)
    18             (Design and Contingencies - $10,000)
    19         (2)  Mercer County Line to US 322, Pavement
    20             Rehabilitation and Safety Improvements      1,815,000
    21             (Base Project Allocation - $1,650,000)
    22             (Design and Contingencies - $165,000)
    23         (3)  US 322 to Erie County Line, Pavement
    24             Rehabilitation and Safety Improvements      2,475,000
    25             (Base Project Allocation - $2,250,000)
    26             (Design and Contingencies - $225,000)
    27         (4)  SR 3013, Bridge over Unger Run, Bridge
    28             Replacement                                 1,640,000
    29             (Base Project Allocation - $1,500,000)
    30             (Land Allocation - $20,000)
    19940S1591B2565                 - 28 -

     1             (Design and Contingencies - $120,000)
     2     (b)  SR 27, SR 77 and SR 408
     3         (1)  Meadville to Titusville, Corridor
     4             Improvement, Reconstruct, Relocate and
     5             Widen                                      15,000,000
     6             (Base Project Allocation - $13,000,000)
     7             (Land Allocation - $1,000,000)
     8             (Design and Contingencies - $1,000,000)
     9  Section 24.  Cumberland County
    10     (a)  I-81
    11         (1)  Franklin County Line to US 11,
    12             Pavement Rehabilitation and Safety
    13             Improvements                                4,125,000
    14             (Base Project Allocation - $3,750,000)
    15             (Design and Contingencies - $375,000)
    16         (2)  US 11 to Dauphin County, Pavement and
    17             Bridge Rehabilitation and Safety
    18             Improvements                                2,640,000
    19             (Base Project Allocation - $2,400,000)
    20             (Design and Contingencies - $240,000)
    21     (b)  I-83
    22         (1)  York County Line to Dauphin County
    23             Line, Pavement and Bridge
    24             Rehabilitation and Safety Improvements      3,795,000
    25             (Base Project Allocation - $3,450,000)
    26             (Design and Contingencies - $345,000)
    27     (c)  US 11
    28         (1)  I-81 to Pennsylvania Turnpike
    29             Entrance, Safety Improvements                 410,000
    30             (Base Project Allocation - $369,000)
    19940S1591B2565                 - 29 -

     1             (Land Allocation - $11,000)
     2             (Design and Contingencies - $30,000)
     3         (2)  Enola Road to Valley Street, Construct
     4             Access Driveway, Install Signalization,
     5             Median Barriers and Turn Lanes              3,000,000
     6             (Base Project Allocation - $2,200,000)
     7             (Land Allocation - $500,000)
     8             (Design and Contingencies - $300,000)
     9     (d)  SR 34
    10         (1)  Intersection with SR 174, Install
    11             Signalization                                 250,000
    12             (Base Project Allocation - $200,000)
    13             (Land Allocation - $25,000)
    14             (Design and Contingencies - $25,000)
    15     (e)  SR 581
    16         (1)  Construct On and Off Ramps with St.
    17             John's Church Road                            460,000
    18             (Base Project Allocation - $400,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $40,000)
    21     (f)  SR 641
    22         (1)  Camp Hill Borough to Central
    23             Boulevard, Widen to Four Lanes, St.
    24             John's Church Road to Sporting Hill
    25             Road, Widen to Three Lanes                    825,000
    26             (Base Project Allocation - $750,000)
    27             (Design and Contingencies - $75,000)
    28     (g)  SR 944
    29         (1)  Intersection with Orr's Bridge Road,
    30             Intersection Improvements                     325,000
    19940S1591B2565                 - 30 -

     1             (Base Project Allocation - $250,000)
     2             (Land Allocation - $60,000)
     3             (Design and Contingencies - $15,000)
     4         (2)  I-81 to North Enola Drive, Widen and
     5             Reconstruct                                 3,250,000
     6             (Base Project Allocation - $2,200,000)
     7             (Land Allocation - $750,000
     8             (Design and Contingencies - $300,000)
     9         (3)  Intersection with Lamb's Gap Road,
    10             Intersection Improvements                     195,000
    11             (Base Project Allocation - $150,000)
    12             (Land Allocation - $30,000)
    13             (Design and Contingencies - $15,000)
    14         (4)  Silver Spring Township to East
    15             Pennsboro Township, Widen to Four
    16             Lanes                                       4,050,000
    17             (Base Project Allocation - $3,500,000)
    18             (Land Allocation - $200,000)
    19             (Design and Contingencies - $350,000)
    20     (h)  SR 1004
    21         (1)  Wertzville Road to US 11/15, Widen,
    22             Improve Intersections and Add Signals         790,000
    23             (Base Project Allocation - $600,000)
    24             (Land Allocation - $100,000)
    25             (Design and Contingencies - $90,000)
    26     (i)  SR 1013
    27         (1)  Intersection with SR 1002,
    28             Intersection Improvements and
    29             Signalization                                 245,000
    30             (Base Project Allocation - $200,000)
    19940S1591B2565                 - 31 -

     1             (Land Allocation - $30,000)
     2             (Design and Contingencies - $15,000)
     3  Section 25.  Dauphin County
     4     (a)  PA 283
     5         (1)  PA 341 to Lancaster County Line,
     6             Pavement and Bridge Rehabilitation and
     7             Safety Improvements                         1,485,000
     8             (Base Project Allocation - $1,350,000)
     9             (Design and Contingencies - $135,000)
    10     (b)  I-81
    11         (1)  US 22/322 to Lebanon County Line,
    12             Rehabilitation and Safety Improvements        660,000
    13             (Base Project Allocation - $600,000)
    14             (Design and Contingencies - $60,000)
    15         (2)  SAFETY REST AREAS, CONSTRUCTION OF                    <--
    16             SEWER AND WATER LINES                          46,000
    17             (BASE PROJECT ALLOCATION - $46,000)
    18     (c)  I-83
    19         (1)  19th Street to Colonial Park, Pavement
    20             Rehabilitation and Safety Improvements        154,000
    21             (Base Project Allocation - $140,000)
    22             (Design and Contingencies - $14,000)
    23     (d)  I-283
    24         (1)  Junction I-83 to Pennsylvania
    25             Turnpike, Pavement and Bridge
    26             Rehabilitation and Safety Improvements        495,000
    27             (Base Project Allocation - $450,000)
    28             (Design and Contingencies - $45,000)
    29     (e)  US 22/322
    30         (1)  Dauphin Narrows to Amity Hall,
    19940S1591B2565                 - 32 -

     1             Pavement and Bridge Rehabilitation and
     2             Safety Improvements                         1,870,000
     3             (Base Project Allocation - $1,700,000)
     4             (Design and Contingencies - $170,000)
     5  Section 26.  Delaware County
     6     (a)  SR 3029
     7         (1)  Chelsea Road at Concord and Foulk
     8             Intersection Improvement                      192,000
     9             (Base Project Allocation - $120,000)
    10             (Land Allocation - $35,000)
    11             (Design and Contingencies - $37,000)
    12     (b)  I-95
    13         (1)  Delaware State Line to City of
    14             Philadelphia, Rehabilitation and Safety
    15             Improvements                                1,980,000
    16             (Base Project Allocation - $1,800,000)
    17             (Design and Contingencies - $180,000)
    18     (c)  I-476
    19         (1)  Junction I-95 to Montgomery County
    20             Line, Pavement Rehabilitation and
    21             Safety Improvements                         2,640,000
    22             (Base Project Allocation - $2,400,000)
    23             (Design and Contingencies - $240,000)
    24  Section 27.  Elk County
    25     (a)  SR 1014
    26         (1)  Intersection with US 219, Intersection
    27             Improvements                                  720,000
    28             (Base Project Allocation - $500,000)
    29             (Land Allocation - $120,000)
    30             (Design and Contingencies - $100,000)
    19940S1591B2565                 - 33 -

     1  Section 28.  Erie County
     2     (a)  PA 17
     3         (1)  Southern Tier Expressway, I-90 to PA
     4             89, Additional Two-Lane Roadway             1,555,000
     5             (Base Project Allocation - $1,523,000)
     6             (Design and Contingencies - $32,000)
     7         (2)  Southern Tier Expressway, PA 89 to New
     8             York, Additional Two-Lane Roadway           1,859,000
     9             (Base Project Allocation - $1,793,000)
    10             (Design and Contingencies - $66,000)
    11     (b)  I-79
    12         (1)  Crawford County Line to PA 5, Pavement
    13             Rehabilitation and Safety Improvements      3,135,000
    14             (Base Project Allocation - $2,850,000)
    15             (Design and Contingencies - $285,000)
    16     (c)  I-90
    17         (1)  Ohio State Line to PA 832, Pavement
    18             Rehabilitation and Safety Improvements        800,000
    19             (Base Project Allocation - $750,000)
    20             (Design and Contingencies - $50,000)
    21         (2)  PA 832 to New York State Line,
    22             Pavement Rehabilitation and Safety
    23             Improvements                                4,125,000
    24             (Base Project Allocation - $3,750,000)
    25             (Design and Contingencies - $375,000)
    26         (3)  Construct Weigh Station                       55,000
    27             (Base Project Allocation - $50,000)
    28             (Design and Contingencies - $5,000)
    29     (d)  US 6 to PA 17 (Southern Tier Expressway)
    30         (1)  Needs Study                                  100,000
    19940S1591B2565                 - 34 -

     1             (Base Project Allocation - $100,000)
     2     (e)  US 6/PA 97
     3         (1)  Passing Lane at Range's Corners Hill         500,000
     4             (Base Project Allocation - $500,000)
     5         (2)  Passing Lane at Slaughter Run Crest          200,000
     6             (Base Project Allocation - $200,000)
     7     (f)  PA 8 and PA 89
     8         (1)  Union City to Wattsburg, Needs Study
     9             for Spot Improvements                         100,000
    10             (Base Project Allocation - $100,000)
    11  Section 29.  Fayette County
    12     (a)  PA 31
    13         (1)  Three Mile Hill Ramp, Truck Escape
    14             Ramp                                          165,000
    15             (Base Project Allocation - $100,000)
    16             (Land Allocation - $40,000)
    17             (Design and Contingencies - $25,000)
    18     (b)  PA 51
    19         (1)  Intersection with SR 4036 and T-699,
    20             Intersection Improvement and Signal
    21             Update                                        120,000
    22             (Base Project Allocation - $104,000)
    23             (Land Allocation - $6,000)
    24             (Design and Contingencies - $10,000)
    25  Section 30.  Forest County
    26     (a)  PA 948
    27         (1)  Warren County Line to South of
    28             Brookston, Widen and Reconstruct              320,000
    29             (Base Project Allocation - $280,000)
    30             (Land Allocation - $20,000)
    19940S1591B2565                 - 35 -

     1             (Design and Contingencies - $20,000)
     2  Section 31.  Franklin County
     3     (a)  PA 16
     4         (1)  Welty Road to Old Mill Road, Widen and
     5             Safety Improvements                           133,000
     6             (Base Project Allocation - $115,000)
     7             (Design and Contingencies - $18,000)
     8         (2)  Old Forge Road to Midvale Road,
     9             Intersection Improvements                     124,000
    10             (Base Project Allocation - $55,000)
    11             (Land Allocation - $60,000)
    12             (Design and Contingencies - $9,000)
    13         (3)  Intersection with Old Forge Road and
    14             Midvale Road, Signals and Safety
    15             Improvements                                   28,000
    16             (Base Project Allocation - $25,000)
    17             (Design and Contingencies - $3,000)
    18         (4)  Ridge Road to Grove Worldwide, Safety
    19             Improvements                                   11,000
    20             (Base Project Allocation - $10,000)
    21             (Design and Contingencies - $1,000)
    22         (5)  Interchange with I-81, Improvements            9,000
    23             (Base Project Allocation - $8,000)
    24             (Design and Contingencies - $1,000)
    25         (6)  Monterey Lane to Adams County Line,
    26             Truck Climbing and Passing Lanes              247,000
    27             (Base Project Allocation - $165,000)
    28             (Land Allocation - $60,000)
    29             (Design and Contingencies - $22,000)
    30         (7)  Intersection with Virginia Avenue and
    19940S1591B2565                 - 36 -

     1             Roadside Avenue, Intersection
     2             Improvements                                   51,000
     3             (Base Project Allocation - $20,000)
     4             (Land Allocation - $20,000)
     5             (Design and Contingencies - $11,000)
     6     (b)  North Welty Road
     7         (1)  Extend to SR 2012, Construct Road            440,000
     8             (Base Project Allocation - $240,000)
     9             (Land Allocation - $50,000)
    10             (Design and Contingencies - $150,000)
    11     (c)  I-81
    12         (1)  Maryland State Line to US 30, Pavement
    13             Rehabilitation and Safety Improvements      2,475,000
    14             (Base Project Allocation - $2,250,000)
    15             (Design and Contingencies - $225,000)
    16         (2)  US 30 to Cumberland County, Pavement
    17             and Bridge Rehabilitation and Safety
    18             Improvements                                1,815,000
    19             (Base Project Allocation - $1,650,000)
    20             (Design and Contingencies - $165,000)
    21     (d)  US 30
    22         (1)  PA 995 to PA 116, Safety Improvements        295,000
    23             (Base Project Allocation - $250,000)
    24             (Land Allocation - $5,000)
    25             (Design and Contingencies - $40,000)
    26         (2)  Walker Avenue to Old US 30, Widening       1,980,000
    27             (Base Project Allocation - $1,280,000)
    28             (Land Allocation - $500,000)
    29             (Design and Contingencies - $200,000)
    30         (3)  US 30 Split to Walker Avenue,
    19940S1591B2565                 - 37 -

     1             Widening                                    1,620,000
     2             (Base Project Allocation - $880,000)
     3             (Land Allocation - $540,000)
     4             (Design and Contingencies - $200,000)
     5  Section 32.  Fulton County
     6     (a)  I-70
     7         (1)  Crystal Springs Bridge at Crystal
     8             Springs, Bridge Rehabilitation                 45,000
     9             (Base Project Allocation - $35,000)
    10             (Design and Contingencies - $10,000)
    11  Section 33.  Greene County
    12     (a)  I-79
    13         (1)  West Virginia Line to Washington
    14             County Line, Pavement Rehabilitation
    15             and Safety Improvements                     3,795,000
    16             (Base Project Allocation - $3,450,000)
    17             (Design and Contingencies - $345,000)
    18  Section 34.  Huntingdon County
    19     (a)  SR 0453
    20         (1)  Nealmont to SR 4013, Widening and
    21             Reconstruction                              8,000,000
    22             (Base Project Allocation - $6,500,000)
    23             (Land Allocation - $750,000)
    24             (Design and Contingencies - $750,000)
    25     (b)  SR 0994
    26         (1)  SR 3001 to SR 0655, Reconstruction        14,000,000
    27             (Base Project Allocation - $14,000,000)
    28  Section 35.  Indiana County
    29     (a)  PA 56
    30         (1)  Seward Railroad Bridge, Replace
    19940S1591B2565                 - 38 -

     1             Structure                                     590,000
     2             (Base Project Allocation - $500,000)
     3             (Land Allocation - $30,000)
     4             (Design and Contingencies - $60,000)
     5         (2)  Armagh Bridge, Bridge Rehabilitation         450,000
     6             (Base Project Allocation - $375,000)
     7             (Land Allocation - $40,000)
     8             (Design and Contingencies - $35,000)
     9     (b)  US 119
    10         (1)  Railroad Overpass at Twolick to PA
    11             286, Pavement Rehabilitation and Safety
    12             Improvements                                4,024,000
    13             (Base Project Allocation - $4,000,000)
    14             (Design and Contingencies - $24,000)
    15         (2)  SR 1002 to Rayne Township Line,
    16             Pavement Rehabilitation and Safety
    17             Improvements                                2,442,000
    18             (Base Project Allocation - $2,415,000)
    19             (Design and Contingencies - $27,000)
    20         (3)  Indiana Bypass, Center and White
    21             Townships, Expressway Restoration           7,120,000
    22             (Base Project Allocation - $7,000,000)
    23             (Design and Contingencies - $120,000)
    24         (4)  Indiana Bypass, White and Rayne
    25             Townships, Expressway Restoration           7,120,000
    26             (Base Project Allocation - $7,000,000)
    27             (Design and Contingencies - $120,000)
    28     (c)  US 422
    29         (1)  Twolick Dam to Pikes Peak, Pavement
    30             and Bridge Rehabilitation and Safety
    19940S1591B2565                 - 39 -

     1             Improvements                                2,024,000
     2             (Base Project Allocation - $2,000,000)
     3             (Design and Contingencies - $24,000)
     4         (2)  US 119 to Twolick Dam, Pavement and
     5             Bridge Rehabilitation and Safety
     6             Improvements                                2,024,000
     7             (Base Project Allocation - $2,000,000)
     8             (Design and Contingencies - $24,000)
     9         (3)  Indiana Bypass, Twolick Dam to Pikes
    10             Peak, Expressway Restoration               10,120,000
    11             (Base Project Allocation - $10,000,000)
    12             (Design and Contingencies - $120,000)
    13         (4)  Indiana Bypass, SR 119 to Twolick Dam,
    14             Expressway Restoration                      7,120,000
    15             (Base Project Allocation - $7,000,000)
    16             (Design and Contingencies - $120,000)
    17         (5)  US 422 in Cherryhill and Pine
    18             Townships, Widening, Restoration and
    19             Reconstruction                              5,300,000
    20             (Base Project Allocation - $5,000,000)
    21             (Land Allocation - $100,000)
    22             (Design and Contingencies - $200,000)
    23     (d)  PA 286
    24         (1)  Oakland Avenue Three Lanes, Highway
    25             Restoration and Intersection
    26             Improvement                                 1,900,000
    27             (Base Project Allocation - $1,500,000)
    28             (Land Allocation - $200,000)
    29             (Design and Contingencies - $200,000)
    30         (2)  ROSS STREET EXTENSION, TWO-LANE                       <--
    19940S1591B2565                 - 40 -

     1             RELOCATION                                    143,000
     2             (BASE PROJECT ALLOCATION - $143,000)
     3     (e)  PA 403
     4         (1)  Clymer East, Cherryhill Township to
     5             Clymer Borough, Restoration and
     6             Reconstruction                              4,280,000
     7             (Base Project Allocation - $4,000,000)
     8             (Land Allocation - $200,000)
     9             (Design and Contingencies - $80,000)
    10     (f)  Geesey Road
    11         (1)  Relocation of Geesey Road from SR 1001
    12             to SR 1006 - Two Lane Relocation for
    13             Runway Expansion                              350,000
    14             (Base Project Allocation - $270,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $60,000)
    17  Section 36.  Jefferson County
    18     (a)  I-80
    19         (1)  PA 28 to Falls Creek, Pavement and
    20             Bridge Rehabilitation and Safety
    21             Improvements                                  990,000
    22             (Base Project Allocation - $900,000)
    23             (Design and Contingencies - $90,000)
    24         (2)  Exit 15 to Westbound Roadside Rest,
    25             Preventative Maintenance                      360,000
    26             (Base Project Allocation - $350,000)
    27             (Design and Contingencies - $10,000)
    28         (3)  Fall Creek Westbound Roadside Rest to
    29             County Line, Preventative Maintenance         740,000
    30             (Base Project Allocation - $720,000)
    19940S1591B2565                 - 41 -

     1             (Design and Maintenance - $20,000)
     2     (b)  US 119
     3         (1)  US 119 in Punxsutawney, Widen and
     4             Reconstruct                                 1,000,000
     5             (Base Project Allocation - $960,000)
     6             (Design and Contingencies - $40,000)
     7  Section 37.  Juniata County
     8     (a)  US 22/322
     9         (1)  Thompsontown to Port Royal, Pavement
    10             and Bridge Rehabilitation and Safety
    11             Improvements                                  930,000
    12             (Base Project Allocation - $900,000)
    13             (Design and Contingencies - $30,000)
    14  Section 38.  Lackawanna County
    15     (a)  PA 307
    16         (1)  Mulberry Street to North Scranton
    17             Expressway, Archway and Scenic
    18             Enhancements                                  475,000
    19             (Base Project Allocation - $427,000)
    20             (Design and Contingencies - $48,000)
    21     (b)  I-81
    22         (1)  Luzerne County Line to I-380, Pavement
    23             Rehabilitation and Safety Improvements        396,000
    24             (Base Project Allocation - $360,000)
    25             (Design and Contingencies - $36,000)
    26         (2)  I-380 to Junction US 6, Pavement
    27             Rehabilitation and Safety Improvements        110,000
    28             (Base Project Allocation - $100,000)
    29             (Design and Contingencies - $10,000)
    30         (3)  US 6 to PA 374, Pavement and Bridge
    19940S1591B2565                 - 42 -

     1             Rehabilitation and Safety Improvements      3,135,000
     2             (Base Project Allocation - $2,850,000)
     3             (Design and Contingencies - $285,000)
     4         (4)  Exit 56 to Main Avenue, Rehabilitation
     5             and Intersection Improvements               4,300,000
     6             (Base Project Allocation - $3,600,000)
     7             (Land Allocation - $300,000)
     8             (Design and Contingencies - $400,000)
     9     (c)  I-84
    10         (1)  Mount Cobb to Wayne County, Pavement
    11             and Bridge Rehabilitation and Safety
    12             Improvements                                1,320,000
    13             (Base Project Allocation - $1,200,000)
    14             (Design and Contingencies - $120,000)
    15     (d)  I-380
    16         (1)  Junction I-81 to Monroe County Line,
    17             Rehabilitation and Safety Improvements      2,475,000
    18             (Base Project Allocation - $2,250,000)
    19             (Design and Contingencies - $225,000)
    20     (e)  US 6
    21         (1)  From Pennsylvania Turnpike to North
    22             Scranton Expressway, Safety
    23             Improvements                                  209,000
    24             (Base Project Allocation - $179,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $20,000)
    27         (2)  From Main Avenue to US 6, Construct
    28             New Road                                    4,000,000
    29             (Base Project Allocation - $2,500,000)
    30             (Land Allocation - $1,200,000)
    19940S1591B2565                 - 43 -

     1             (Design and Contingencies - $300,000)
     2  Section 39.  Lancaster County
     3     (a)  US 30
     4         (1)  PA 283 to PA 222, Widening                14,460,000
     5             (Base Project Allocation - $13,200,000)
     6             (Land Allocation - $1,000,000)
     7             (Design and Contingencies - $260,000)
     8     (B)  PA 999                                                    <--
     9         (1)  MILLERSVILLE RELIEF ROUTE, CONSTRUCT
    10             NEW TWO-LANE HIGHWAY                          892,000
    11             (BASE PROJECT ALLOCATION - $800,000)
    12             (LAND ALLOCATION - $40,000)
    13             (DESIGN AND CONTINGENCIES - $52,000)
    14  Section 40.  Lawrence County
    15     (a)  PA 60
    16         (1)  PA 65 Interchange to Mercer County
    17             Line, Rehabilitation and Safety
    18             Improvements                                3,135,000
    19             (Base Project Allocation - $2,850,000)
    20             (Design and Contingencies - $285,000)
    21     (b)  I-79
    22         (1)  PA 108 to Mercer County Line, Pavement
    23             Rehabilitation and Safety Improvements        990,000
    24             (Base Project Allocation - $900,000)
    25             (Design and Contingencies - $90,000)
    26  Section 41.  Lebanon County
    27     (a)  SR 422
    28         (1)  SR 422 and SR 38-25, Repair Irregular
    29             Road Surfaces                                  22,000
    30             (Base Project Allocation - $20,000)
    19940S1591B2565                 - 44 -

     1             (Design and Contingencies - $2,000)
     2     (b)  I-78
     3         (1)  I-81 to Berks County Line, Pavement
     4             and Bridge Rehabilitation and Safety
     5             Improvements                                  660,000
     6             (Base Project Allocation - $600,000)
     7             (Design and Contingencies - $60,000)
     8     (c)  I-81
     9         (1)  Dauphin County to I-78, Pavement
    10             Rehabilitation and Safety Improvements        385,000
    11             (Base Project Allocation - $350,000)
    12             (Design and Contingencies - $35,000)
    13         (2)  I-78 to Schuylkill County Line,
    14             Pavement Rehabilitation and Safety
    15             Improvements                                1,980,000
    16             (Base Project Allocation - $1,800,000)
    17             (Design and Contingencies - $180,000)
    18  Section 42.  Lehigh County
    19     (a)  PA 309
    20         (1)  I-78 to Walbert Avenue, Pavement and
    21             Bridge Rehabilitation and Safety
    22             Improvements                                1,970,000
    23             (Base Project Allocation - $1,800,000)
    24             (Land Allocation - $50,000)
    25             (Design and Contingencies - $120,000)
    26     (b)  PA 987
    27         (1)  City Line Road to Schoenersville Road,
    28             Widen to Four Lanes                        12,628,000
    29             (Base Project Allocation - $10,300,000)
    30             (Land Allocation - $1,976,000)
    19940S1591B2565                 - 45 -

     1             (Design and Contingencies - $352,000)
     2     (c)  SR 2036
     3         (1)  Relocate Four-Lane Road to SR 378,
     4             Environmental Studies                         300,000
     5             (Design and Contingencies - $300,000)
     6         (2)  Relocation of Four-Lane Road to SR
     7             378                                         3,300,000
     8             (Base Project Allocation - $3,000,000)
     9             (Design and Contingencies - $300,000)
    10     (d)  SR 1008
    11         (1)  Intersection with SR 1017,
    12             Intersection Improvements and Signals         635,000
    13         (2)  Intersection with SR 145, Intersection
    14             Improvements                                  293,000
    15             (Base Project Allocation - $83,000)
    16             (Land Allocation - $200,000)
    17             (Design and Contingencies - $10,000)
    18     (e)  SR 145
    19         (1)  Intersection with SR 1010,
    20             Intersection Improvements                   2,250,000
    21         (2)  Intersection with SR 1014,
    22             Intersection Improvements                   1,550,000
    23         (3)  Intersection with SR 329, Intersection
    24             Improvements                                  216,000
    25             (Base Project Allocation - $104,000)
    26             (Land Allocation - $100,000)
    27             (Design and Contingencies - $12,000)
    28         (4)  Intersection with SR 329, Intersection                <--
    29             Improvements                                1,080,000
    30         (5)  Intersection with SR 1008,
    19940S1591B2565                 - 46 -

     1             Intersection Improvements                   1,466,000
     2     (f)  SR 1003
     3         (1)  Intersection with Race Street,
     4             Intersection Improvements                     625,000
     5             (Base Project Allocation - $250,000)
     6             (Land Allocation - $350,000)
     7             (Design and Contingencies - $25,000)
     8     (g)  SR 1004
     9         (1)  Willowbrook Road to Airport Road,
    10             Widen to Four Lanes                         2,770,000
    11             (Base Project Allocation - $1,540,000)
    12             (Land Allocation - $948,000)
    13             (Design and Contingencies - $282,000)
    14         (2)  Airport Road to Schoenersville Road,
    15             Construct Road                              4,568,000
    16             (Base Project Allocation - $3,000,000)
    17             (Land Allocation - $1,161,000)
    18             (Design and Contingencies - $407,000)
    19     (h)  SR 3017
    20         (1)  Race Street Extension to City Line
    21             Road, Widen to Four Lanes                   2,952,000
    22             (Base Project Allocation - $2,125,000)
    23             (Land Allocation - $571,000)
    24             (Design and Contingencies - $256,000)
    25     (i)  I-78
    26         (1)  Fogelsville to Northampton County,
    27             Pavement Rehabilitation and Safety
    28             Improvements                                3,168,000
    29             (Base Project Allocation - $2,880,000)
    30             (Design and Contingencies - $288,000)
    19940S1591B2565                 - 47 -

     1         (2)  Berks County Line to Fogelsville,
     2             Pavement Rehabilitation and Safety
     3             Improvements                                  440,000
     4             (Base Project Allocation - $400,000)
     5             (Design and Contingencies - $40,000)
     6         (3)  Fogelsville Rest Area, Construct
     7             Safety Rest Area                              492,000
     8             (Base Project Allocation - $392,000)
     9             (Design and Contingencies - $100,000)
    10     (j)  US 222
    11         (1)  I-78 to Berks County Line,
    12             Transportation Study                          150,000
    13             (Design and Contingencies - $150,000)
    14     (k)  SR 329
    15         (1)  Intersection with SR 329 1023,                        <--
    16             Intersection Improvements                      46,000
    17             (Base Project Allocation - $33,000)
    18             (Land Allocation - $8,000)
    19             (Design and Contingencies - $5,000)
    20         (2)  Intersection with SR 1023,                            <--
    21             Intersection Improvements                     230,000
    22  Section 43.  Luzerne County
    23     (a)  SR 29
    24         (1)  John Fine Bridge to I-81,
    25             Reconstruction                              6,600,000
    26     (b)  SR 115
    27         (1)  I-81 South Ramp to Exit 46, Construct
    28             New Lane                                    3,000,000
    29     (c)  SR 3032
    30         (1)  PA 93 to Stockton Road, Construct New
    19940S1591B2565                 - 48 -

     1             Lane                                          550,000
     2     (d)  IDC
     3         (1)  Interchange Trade Zone to Access Road,
     4             Construct New Roadway                      10,000,000
     5     (e)  I-80
     6         (1)  Columbia County to White Haven,
     7             Pavement Rehabilitation and Safety
     8             Improvements                                4,125,000
     9             (Base Project Allocation - $3,750,000)
    10             (Design and Contingencies - $375,000)
    11     (f)  I-81
    12         (1)  Schuylkill County Line to PA 93,
    13             Pavement Rehabilitation and Safety
    14             Improvements                                  396,000
    15             (Base Project Allocation - $360,000)
    16             (Design and Contingencies - $36,000)
    17         (2)  I-80 to PA 29, Pavement and Bridge
    18             Rehabilitation and Safety Improvements      4,620,000
    19             (Base Project Allocation - $4,200,000)
    20             (Design and Contingencies - $420,000)
    21         (3)  PA 29 to Lackawanna County Line,
    22             Pavement and Bridge Rehabilitation and
    23             Safety Improvements                         1,650,000
    24             (Base Project Allocation - $1,500,000)
    25             (Design and Contingencies - $150,000)
    26         (4)  PA 93 to I-80, Pavement and Bridge
    27             Rehabilitation and Safety Improvements      1,980,000
    28             (Base Project Allocation - $1,800,000)
    29             (Design and Contingencies - $180,000)
    30  Section 44.  Lycoming County
    19940S1591B2565                 - 49 -

     1     (a)  I-180
     2         (1)  Northumberland County Line to US 15,
     3             Pavement Rehabilitation and Safety
     4             Improvements                                3,135,000
     5             (Base Project Allocation - $2,850,000)
     6             (Design and Contingencies - $285,000)
     7     (b)  US 15
     8         (1)  I-180 to Foy Avenue, Pavement and
     9             Bridge Rehabilitation and Safety
    10             Improvements                                  264,000
    11             (Base Project Allocation - $240,000)
    12             (Design and Contingencies - $24,000)
    13  Section 45.  McKean County
    14     (a)  PA 155
    15         (1)  Port Allegany to Turtlepoint,
    16             Reconstruction                                670,000
    17             (Base Project Allocation - $650,000)
    18             (Design and Contingencies - $20,000)
    19     (b)  PA 346
    20         (1)  Bradford to New York State Line,
    21             Resurface                                     500,000
    22             (Base Project Allocation - $480,000)
    23             (Design and Contingencies - $20,000)
    24     (c)  US 6
    25         (1)  Biddle Street to North Fraley Street
    26             in Kane, Rehabilitation                       550,000
    27             (Base Project Allocation - $450,000)
    28             (Land Allocation - $80,000)
    29             (Design and Contingencies - $20,000)
    30  Section 46.  Mercer County
    19940S1591B2565                 - 50 -

     1     (a)  I-79
     2         (1)  Lawrence County Line to I-80, Pavement
     3             and Bridge Rehabilitation and Safety
     4             Improvements                                  990,000
     5             (Base Project Allocation - $900,000)
     6             (Design and Contingencies - $90,000)
     7         (2)  I-80 to Crawford County Line, Pavement
     8             Rehabilitation and Safety Improvements      3,300,000
     9             (Base Project Allocation - $3,000,000)
    10             (Design and Contingencies - $300,000)
    11     (b)  I-80
    12         (1)  PA 173 to Venango County, Pavement and
    13             Bridge Rehabilitation and Safety
    14             Improvements                                  825,000
    15             (Base Project Allocation - $750,000)
    16             (Design and Contingencies - $75,000)
    17  Section 47.  Mifflin County
    18     (a)  US 22
    19         (1)  West of Lewistown to Lewistown Bypass,
    20             Four-Lane Relocation                       13,950,000
    21             (Base Project Allocation - $13,050,000)
    22             (Land Allocation - $900,000)
    23     (b)  US 22/322
    24         (1)  Lewistown to Mifflintown, Four-Lane
    25             Relocation/Reconstruction                   1,000,000
    26             (Design and Contingencies - $1,000,000)
    27     (c)  US 22/522
    28         (1)  Railroad Crossing at Juniata Street
    29             and Water Street Intersection,
    30             Improvements                                   12,000
    19940S1591B2565                 - 51 -

     1             (Base Project Allocation - $10,000)
     2             (Design and Contingencies - $2,000)
     3  Section 48.  Monroe County
     4     (a)  PA 33
     5         (1)  US 209 to I-80, Pavement and Bridge
     6             Rehabilitation and Safety Improvements      2,390,000
     7             (Base Project Allocation - $2,200,000)
     8             (Land Allocation - $50,000)
     9             (Design and Contingencies - $140,000)
    10     (b)  I-80
    11         (1)  PA 115 to Delaware Water Gap, Pavement
    12             Rehabilitation and Safety Improvements      4,620,000
    13             (Base Project Allocation - $4,200,000)
    14             (Design and Contingencies - $420,000)
    15         (2)  I-380 to PA 33, Pavement
    16             Rehabilitation and Safety Improvements        825,000
    17             (Base Project Allocation - $750,000)
    18             (Design and Contingencies - $75,000)
    19         (3)  Construct Weigh Station at Rest Area          55,000
    20             (Base Project Allocation - $50,000)
    21             (Design and Contingencies - $5,000)
    22     (c)  I-380
    23         (1)  Lackawanna County Line to I-80,
    24             Rehabilitation and Safety Improvements      1,980,000
    25             (Base Project Allocation - $1,800,000)
    26             (Design and Contingencies - $180,000)
    27     (d)  US 209
    28         (1)  PA 33 to I-80, Pavement and Bridge
    29             Rehabilitation and Safety Improvements      1,800,000
    30             (Base Project Allocation - $1,620,000)
    19940S1591B2565                 - 52 -

     1             (Land Allocation - $40,000)
     2             (Design and Contingencies - $140,000)
     3         (2)  Sciota to Snydersville, Pavement and
     4             Bridge Rehabilitation and Safety
     5             Improvements                                1,980,000
     6             (Base Project Allocation - $1,800,000)
     7             (Design and Contingencies - $180,000)
     8  Section 49.  Montgomery County
     9     (a)  SR 6000
    10         (1)  Piedmont Highway Corridor, PA 309 to
    11             Pennsylvania Turnpike, Transportation
    12             Study                                         120,000
    13             (Design and Contingencies - $120,000)
    14     (b)  I-76
    15         (1)  City Line Avenue to Pennsylvania
    16             Turnpike, Pavement Rehabilitation and
    17             Safety Improvements                         1,980,000
    18             (Base Project Allocation - $1,800,000)
    19             (Design and Contingencies - $180,000)
    20     (c)  I-476
    21         (1)  Delaware County Line to Pennsylvania
    22             Turnpike, Pavement Rehabilitation and
    23             Safety Improvements                           825,000
    24             (Base Project Allocation - $750,000)
    25             (Design and Contingencies - $75,000)
    26     (d)  US 202
    27         (1)  Johnson Highway to Main Street,
    28             Reconstruct                                   700,000
    29             (Base Project Allocation - $610,000)
    30             (Land Allocation - $20,000)
    19940S1591B2565                 - 53 -

     1             (Design and Contingencies - $70,000)
     2     (e)  US 422
     3         (1)  Berks County Line to Porter Road,
     4             Pavement and Bridge Rehabilitation and
     5             Safety Improvements                         3,900,000
     6             (Base Project Allocation - $3,600,000)
     7             (Land Allocation - $100,000)
     8             (Design and Contingencies - $200,000)
     9         (2)  Porter Road to Township Line, Pavement
    10             and Bridge Rehabilitation and Safety
    11             Improvements                                2,900,000
    12             (Base Project Allocation - $2,600,000)
    13             (Land Allocation - $100,000)
    14             (Design and Contingencies - $200,000)
    15     (f)  SR 463
    16         (1)  Intersection with SR 611, Easton Road,
    17             Intersection Improvements                     400,000
    18             (Base Project Allocation - $300,000)
    19             (Land Allocation - $60,000)
    20             (Design and Contingencies - $40,000)
    21         (2)  Intersection with SR 2007, Norristown
    22             Road, Intersection Improvements               170,000
    23             (Base Project Allocation - $120,000)
    24             (Land Allocation - $30,000)
    25             (Design and Contingencies - $20,000)
    26         (3)  From PA 611, Easton Road, to SR 2007,
    27             Norristown Road, Widening                     630,000
    28             (Base Project Allocation - $500,000)
    29             (Land Allocation - $70,000)
    30             (Design and Contingencies - $60,000)
    19940S1591B2565                 - 54 -

     1     (g)  SR 3009
     2         (1)  Realignment of Intersection with SR
     3             3007, Including Realignment of Local
     4             Roads, Driveways and Other Ancillary
     5             Work                                          240,000
     6             (Base Project Allocation - $190,000)
     7             (Design and Contingencies - $50,000)
     8         (2)  Construction of Left Turn Lanes on SR
     9             3009 and Intersecting SR 3017                 100,000
    10             (Base Project Allocation - $75,000)
    11             (Design and Contingencies - $25,000)
    12  Section 50.  Montour County
    13     (a)  I-80
    14         (1)  PA 254 to Columbia County, Pavement
    15             and Bridge Rehabilitation and Safety
    16             Improvements                                1,815,000
    17             (Base Project Allocation - $1,650,000)
    18             (Design and Contingencies - $165,000)
    19         (2)  Eastbound and Westbound, Safety Rest
    20             Areas, Parking Expansion and Safety
    21             Improvements                                  275,000
    22             (Base Project Allocation - $250,000)
    23             (Design and Contingencies - $25,000)
    24  Section 51.  Northampton County
    25     (a)  PA 33
    26         (1)  Belfast to PA 512, Pavement and Bridge
    27             Rehabilitation and Safety Improvements      2,790,000
    28             (Base Project Allocation - $2,600,000)
    29             (Land Allocation - $50,000)
    30             (Design and Contingencies - $140,000)
    19940S1591B2565                 - 55 -

     1         (2)  SR 248 to Belfast, Pavement and Bridge
     2             Rehabilitation and Safety Improvements      4,810,000
     3             (Base Project Allocation - $4,600,000)
     4             (Land Allocation - $50,000)
     5             (Design and Contingencies - $160,000)
     6         (3)  Interchange with I-78, Interchange
     7             Improvements                               20,000,000
     8         (4)  PA 512 to Monroe County Line,
     9             Restoration                                16,500,000
    10         (5)  Interchange with PA 512, Interchange
    11             Improvements                                1,800,000
    12     (b)  SR 191
    13         (1)  Intersections along SR 191 Corridor,
    14             Intersection Improvements                   2,650,000
    15     (c)  SR 329
    16         (1)  Intersection with SR 987, Intersection
    17             Improvements                                  650,000
    18     (d)  SR 2018
    19         (1)  Willow Park Road to 25th Street,
    20             Improvement to Relieve Congestion             540,000
    21     (e)  SR 2020
    22         (1)  Intersections with Willow Park Road,
    23             Easton Avenue and Butztown Road,
    24             Intersection Improvements                  10,000,000
    25     (f)  I-78
    26         (1)  PA 512 to Delaware River, Pavement and
    27             Bridge Rehabilitation and Safety
    28             Improvements                                  330,000
    29             (Base Project Allocation - $300,000)
    30             (Design and Contingencies - $30,000)
    19940S1591B2565                 - 56 -

     1  Section 52.  Northumberland County
     2     (a)  I-180
     3         (1)  I-80 to Lycoming County Line, Pavement
     4             Rehabilitation and Safety Improvements      1,485,000
     5             (Base Project Allocation - $1,350,000)
     6             (Design and Contingencies - $135,000)
     7  Section 53.  Perry County (Reserved)
     8  Section 54.  Philadelphia County
     9     (a)  SR 2001
    10         (1)  Delaware Avenue, Race Street to
    11             Richmond Street, Reconstruction             3,400,000
    12             (Base Project Allocation - $3,000,000)
    13             (Land Allocation - $400,000)
    14     (b)  I-76
    15         (1)  Delaware River to City Line Avenue,
    16             Pavement Rehabilitation and Safety
    17             Improvements                                2,520,000
    18             (Base Project Allocation - $1,200,000)
    19             (Design and Contingencies - $1,320,000)
    20     (c)  I-95
    21         (1)  Delaware County Line to Woodhaven
    22             Road, Rehabilitation and Safety
    23             Improvements                                3,795,000
    24             (Base Project Allocation - $3,450,000)
    25             (Design and Contingencies - $345,000)
    26     (d)  I-676
    27         (1)  Schuylkill Expressway to I-95,
    28             Pavement Rehabilitation and Safety
    29             Improvements                                  380,000
    30             (Base Project Allocation - $345,000)
    19940S1591B2565                 - 57 -

     1             (Design and Contingencies - $35,000)
     2     (e)  US 1
     3         (1)  Conwell Avenue to Bucks County Line,
     4             Rehabilitation and Operational
     5             Improvements                                3,600,000
     6             (Base Project Allocation - $1,600,000)
     7             (Land Allocation - $1,000,000)
     8             (Design and Contingencies - $1,000,000)
     9         (2)  Ninth Street to Tyson Avenue,
    10             Rehabilitation and Operational
    11             Improvements                                4,600,000
    12             (Base Project Allocation - $2,600,000)
    13             (Land Allocation - $1,000,000)
    14             (Design and Contingencies - $1,000,000)
    15         (3)  Twin Bridges to Ninth Street,
    16             Rehabilitation and Operational
    17             Improvements                                6,800,000
    18             (Base Project Allocation - $4,800,000)
    19             (Land Allocation - $1,000,000)
    20             (Design and Contingencies - $1,000,000)
    21         (4)  Tyson Avenue to Conwell Avenue,
    22             Rehabilitation and Operational
    23             Improvements                                4,000,000
    24             (Base Project Allocation - $2,000,000)
    25             (Land Allocation - $1,000,000)
    26             (Design and Contingencies - $1,000,000)
    27     (f)  SR 2004
    28         (1)  Front Street to 5th Street,
    29             Restoration                                   650,000
    30             (Base Project Allocation - $650,000)
    19940S1591B2565                 - 58 -

     1     (g)  TR 611
     2         (1)  South Broad Street, Avenue of the
     3             Arts, Restoration                           1,486,000
     4             (Base Project Allocation - $1,400,000)
     5             (Design and Contingencies - $86,000)
     6     (h)  SR 63
     7         (1)  SR 63 from Evans Avenue to Philmont
     8             Avenue, Study                                 500,000
     9             (Design and Contingencies - $500,000)
    10  Section 55.  Pike County
    11     (a)  SR 2001
    12         (1)  Restoration of SR 2001                    23,825,000
    13             (Base Project Allocation - $19,859,000)
    14             (Land Allocation - $1,980,000)
    15             (Design and Contingencies - $1,986,000)
    16     (b)  I-84
    17         (1)  PA 507 to New York Line, Pavement and
    18             Bridge Rehabilitation and Safety
    19             Improvements                                5,445,000
    20             (Base Project Allocation - $4,950,000)
    21             (Design and Contingencies - $495,000)
    22  Section 56.  Potter County (Reserved)
    23  Section 57.  Schuylkill County
    24     (a)  PA 61
    25         (1)  I-78 to Frackville, Transportation
    26             Study                                         333,000
    27             (Design and Contingencies - $333,000)
    28     (b)  PA 924
    29         (1)  North of Shenandoah, Restoration             422,000
    30             (Base Project Allocation - $325,000)
    19940S1591B2565                 - 59 -

     1             (Land Allocation - $22,000)
     2             (Design and Contingencies - $75,000)
     3     (c)  I-81
     4         (1)  Ravine to PA 25, Pavement and Bridge
     5             Rehabilitation and Safety Improvements        825,000
     6             (Base Project Allocation - $750,000)
     7             (Design and Contingencies - $75,000)
     8         (2)  PA 54 to Luzerne County Line, Pavement
     9             Rehabilitation and Safety Improvements        660,000
    10             (Base Project Allocation - $600,000)
    11             (Design and Contingencies - $60,000)
    12  Section 58.  Snyder County
    13     (a)  US 15
    14         (1)  Selinsgrove to I-80, Including
    15             Northumberland and Union Counties,
    16             Transportation Study                          260,000
    17             (Design and Contingencies - $260,000)
    18  Section 59.  Somerset County
    19     (a)  SR 3029
    20         (1)  Fayette County Line to SR 3037,
    21             Middlecreek Township, Relocate, Widen,
    22             Reconstruct to 24 Feet and Replace
    23             Bridges                                    16,700,000
    24             (Base Project Allocation - $13,200,000)
    25             (Land Allocation - $1,000,000)
    26             (Design and Contingencies - $2,500,000)
    27     (b)  SR 0056
    28         (1)  Safety Improvements, Intersection
    29             Improvements and Truck Lanes in Ogle
    30             and Paint Townships                        10,000,000
    19940S1591B2565                 - 60 -

     1             (Base Project Allocation - $7,500,000)
     2             (Land Allocation - $1,000,000)
     3             (Design and Contingencies - $1,500,000)
     4     (c)  US 219
     5         (1)  From US 30 to SR 3041, Pavement
     6             Restoration and Bridge Rehabilitations
     7             or Replacements in Jenner, Lincoln and
     8             Somerset Townships                         40,500,000
     9             (Base Construction Allocation -
    10             $36,300,000)
    11             (Land Allocation - $600,000)
    12             (Design and Contingencies - $3,600,000)
    13  Section 60.  Sullivan County (Reserved)
    14  Section 61.  Susquehanna County
    15     (a)  I-81
    16         (1)  PA 374 to Great Bend, Pavement and
    17             Bridge Rehabilitation and Safety
    18             Improvements                                4,290,000
    19             (Base Project Allocation - $3,900,000)
    20             (Design and Contingencies - $390,000)
    21         (2)  I-81 to Great Bend to New York State
    22             Line, Pavement Rehabilitation and
    23             Safety Improvements                           338,000
    24             (Base Project Allocation - $308,000)
    25             (Design and Contingencies - $30,000)
    26  Section 62.  Tioga County
    27     (a)  US 15
    28         (1)  Blossburg to Covington, Two-Lane FOUR-                <--
    29             LANE Relocation                             6,800,000
    30             (Base Project Allocation - $6,500,000)
    19940S1591B2565                 - 61 -

     1             (Land Allocation - $200,000)
     2             (Design and Contingencies - $100,000)
     3         (2)  Covington to Mansfield, Two-Lane FOUR-                <--
     4             LANE Relocation                             4,600,000
     5             (Base Project Allocation - $4,300,000)
     6             (Land Allocation - $200,000)
     7             (Design and Contingencies - $100,000)
     8  Section 63.  Union County
     9     (a)  I-80
    10         (1)  Clinton County Line to PA 254,
    11             Pavement Rehabilitation and Safety
    12             Improvements                                6,930,000
    13             (Base Project Allocation - $3,300,000)
    14             (Design and Contingencies - $3,630,000)
    15     (b)  US 15
    16         (1)  West Milton to White Deer, Pavement
    17             and Bridge Rehabilitation and Safety
    18             Improvements                                1,430,000
    19             (Base Project Allocation - $1,300,000)
    20             (Design and Contingencies - $130,000)
    21  Section 64.  Venango County
    22     (a)  I-80
    23         (1)  Mercer County Line to PA 38, Pavement
    24             and Bridge Rehabilitation and Safety
    25             Improvements                                4,725,000
    26             (Base Project Allocation - $2,250,000)
    27             (Design and Contingencies - $2,475,000)
    28     (b)  PA 8
    29         (1)  Intersection of SR 227 to SR 2024,
    30             Construct Safety Improvements and Truck
    19940S1591B2565                 - 62 -

     1             Climbing Lanes                              1,600,000
     2             (Base Project Allocation - $1,300,000)
     3             (Land Allocation - $200,000)
     4             (Design and Contingencies - $100,000)
     5  Section 65.  Warren County (Reserved)
     6  Section 66.  Washington County
     7     (a)  PA 519
     8         (1)  Houston Borough, Intersection
     9             Improvements                                  100,000
    10             (Base Project Allocation - $60,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $20,000)
    13     (b)  I-70
    14         (1)  West Virginia Line to Taylorstown,
    15             Pavement and Bridge Rehabilitation and
    16             Safety Improvements                           330,000
    17             (Base Project Allocation - $300,000)
    18             (Design and Contingencies - $30,000)
    19         (2)  I-79 NB to I-79 SB, Pavement and
    20             Bridge Rehabilitation and Safety
    21             Improvements                                  330,000
    22             (Base Project Allocation - $300,000)
    23             (Design and Contingencies - $30,000)
    24         (3)  PA 519 to Bentleyville, Pavement and
    25             Bridge Rehabilitation and Safety
    26             Improvements                                  363,000
    27             (Base Project Allocation - $330,000)
    28             (Design and Contingencies - $33,000)
    29     (c)  I-79
    30         (1)  Greene County Line to I-70, Pavement
    19940S1591B2565                 - 63 -

     1             Rehabilitation and Safety Improvements      2,805,000
     2             (Base Project Allocation - $2,550,000)
     3             (Design and Contingencies - $255,000)
     4         (2)  I-70 to Allegheny County Line,
     5             Pavement Rehabilitation and Safety
     6             Improvements                                1,980,000
     7             (Base Project Allocation - $1,800,000)
     8             (Design and Contingencies - $180,000)
     9     (d)  US 22
    10         (1)  West Virginia to PA 18, Pavement and
    11             Bridge Rehabilitation and Safety
    12             Improvements                                1,320,000
    13             (Base Project Allocation - $1,200,000)
    14             (Design and Contingencies - $120,000)
    15     (e)  SR 1053
    16         (1)  Waterdam Road, from Galley Road to LR
    17             62193 Intersection, Resurfacing               700,000
    18             (Base Project Allocation - $700,000)
    19  Section 67.  Wayne County
    20     (a)  I-84
    21         (1)  Lackawanna County Line to PA 507,
    22             Pavement Rehabilitation and Safety
    23             Improvements                                1,320,000
    24             (Base Project Allocation - $1,200,000)
    25             (Design and Contingencies - $120,000)
    26  Section 68.  Westmoreland County
    27     (a)  PA 56
    28         (1)  Seventh Street North to TR 780,
    29             Intersection Improvement and Signal
    30             Update                                        250,000
    19940S1591B2565                 - 64 -

     1             (Base Project Allocation - $217,000)
     2             (Land Allocation - $13,000)
     3             (Design and Contingencies - $20,000)
     4     (b)  I-70
     5         (1)  Washington County to Pennsylvania
     6             Turnpike, Pavement and Bridge
     7             Rehabilitation and Safety Improvements        858,000
     8             (Base Project Allocation - $780,000)
     9             (Design and Contingencies - $78,000)
    10         (2)  Smithton Interchange with I-70 with SR
    11             3031, Interchange Improvements and
    12             Lengthening of the Acceleration and
    13             Deceleration Lanes                            750,000
    14             (Base Project Allocation - $610,000)
    15             (Land Allocation - $100,000)
    16             (Design and Contingencies - $40,000)
    17     (c)  US 22
    18         (1)  Pennsylvania Turnpike to Export,
    19             Reconstruction and Widening to Four
    20             Lanes with Turning Lanes and Safety
    21             Improvements                                4,540,000
    22             (Base Project Allocation - $3,060,000)
    23             (Land Allocation - $1,200,000)
    24             (Design and Contingencies - $280,000)
    25         (2)  Export to Delmont, Reconstruction and
    26             Widening to Four Lanes with Turning
    27             Lanes and Safety Improvements               4,450,000
    28             (Base Project Allocation - $3,330,000)
    29             (Land Allocation - $800,000)
    30             (Design and Contingencies - $320,000)
    19940S1591B2565                 - 65 -

     1     (d)  US 119
     2         (1)  Youngwood to SR 3099, Safety
     3             Improvements                                  340,000
     4             (Base Project Allocation - $320,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $10,000)
     7     (e)  Center Avenue
     8         (1)  Center Avenue, New Stanton Borough,
     9             Two Lane Relocation                           850,000
    10             (Base Project Allocation - $700,000)
    11             (Land Allocation - $50,000)
    12             (Design and Contingencies - $100,000)
    13     (f)  PA 66
    14         (1)  Intersection with US 22 to
    15             Intersection with PA 356 and PA 28,
    16             Construct Four-Lane Limited Access
    17             Highway                                   400,000,000
    18             (Base Project Allocation -
    19             $320,000,000)
    20             (Land Allocation - $30,000,000)
    21             (Design and Contingencies -
    22             $50,000,000)
    23     (g)  PA 28
    24         (1)  Allegheny Valley Connector, New
    25             Kensington to PA 28, Construction of
    26             New Connector                              32,250,000
    27             (Base Project Allocation - $30,000,000)
    28             (Land Allocation - $1,500,000)
    29             (Design and Contingencies - $750,000)
    30     (h)  SR 3031
    19940S1591B2565                 - 66 -

     1         (1)  Smithton Interchange to Paint Kosor
     2             Road, Replace Base, Widen, Resurface,
     3             Replace Box Culvert, Improve Drainage
     4             and Guide Rail, Length of One Mile          2,000,000
     5             (Base Project Allocation - $2,000,000)
     6     (i)  SR 4026
     7         (1)  Reconstruct, Widen and Resurface
     8             Mellon Road from US 22 to County Road
     9             in Penn Township                              500,000
    10             (Base Project Allocation - $450,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $40,000)
    13     (j)  Finley Road
    14         (1)  SR 0201 to the Norfolk and Western
    15             Railway Crossing, the Terminus of SR
    16             3011, Pavement Rehabilitation and
    17             Safety Improvements, Bridge Widening        1,280,000
    18             (Base Project Allocation - $963,000)
    19             (Design and Contingencies - $317,000)
    20     (k)  Westmoreland County Airport
    21         (1)  For Construction of Commercial Air
    22             Service Wing                                1,800,000
    23             (Base Project Allocation - $1,636,000)
    24             (Design and Contingencies - $164,000)
    25  Section 69.  Wyoming County (Reserved)
    26  Section 70.  York County
    27     (a)  I-83
    28         (1)  Maryland State Line to Leader Heights,
    29             Pavement and Bridge Rehabilitation and
    30             Safety Improvements                         2,310,000
    19940S1591B2565                 - 67 -

     1             (Base Project Allocation - $2,100,000)
     2             (Design and Contingencies - $210,000)
     3         (2)  Leader Heights to US 30, Pavement and
     4             Bridge Rehabilitation Safety
     5             Improvements                                1,155,000
     6             (Base Project Allocation - $1,050,000)
     7             (Design and Contingencies - $105,000)
     8         (3)  US 30 to Pennsylvania Turnpike,
     9             Pavement and Bridge Rehabilitation and
    10             Safety Improvements                         3,465,000
    11             (Base Project Allocation - $3,150,000)
    12             (Design and Contingencies - $315,000)
    13     (b)  SR 114
    14         (1)  I-83 to Capital City Airport,
    15             Restoration                                   610,000
    16             (Base Project Allocation - $610,000)
    17         (2)  Intersection with Stetler Road, Site
    18             Clearance                                     500,000
    19             (Base Project Allocation - $500,000)
    20     (c)  SR 177
    21         (1)  Construct RC Box Culvert West of SR
    22             1003                                           98,000
    23             (Base Project Allocation - $80,000)
    24             (Land Allocation - $5,000)
    25             (Design and Contingencies - $13,000)
    26     (d)  SR 1003
    27         (1)  SR 114 to Marsh Run Road, Restoration        717,000
    28             (Base Project Allocation - $717,000)
    29  Section 71.  Statewide projects
    30     (a)  Noise Barrier Study                              200,000
    19940S1591B2565                 - 68 -

     1             (Design and Contingencies - $200,000)
     2     (b)  Interstate Highway Emergency Call Box                     <--
     3         System. Call Boxes to be Placed on Both
     4         Sides of All Interstate Highways at
     5         Locations Determined by the Department of
     6         Transportation, Including Pilot Projects.       4,000,000
     7  SECTION 71.1.  DEBT AUTHORIZATION.                                <--
     8     (A)  PUBLIC IMPROVEMENT PROJECTS.--THE GOVERNOR, THE AUDITOR   <--
     9  GENERAL AND THE STATE TREASURER ARE HEREBY AUTHORIZED AND
    10  DIRECTED TO BORROW, FROM TIME TO TIME, IN ADDITION TO ANY
    11  AUTHORIZATION HERETOFORE OR HEREAFTER ENACTED, ON THE CREDIT OF
    12  THE COMMONWEALTH, SUBJECT TO THE LIMITATIONS PROVIDED IN THE
    13  CURRENT CAPITAL BUDGET, MONEY NOT EXCEEDING IN THE AGGREGATE THE
    14  SUM OF $3,600,000 $4,600,000 AS MAY BE FOUND NECESSARY TO CARRY   <--
    15  OUT THE ACQUISITION AND CONSTRUCTION OF THE PUBLIC IMPROVEMENT
    16  PROJECTS SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET.
    17     (B)  REDEVELOPMENT ASSISTANCE PROJECTS.--THE GOVERNOR, THE     <--
    18  AUDITOR GENERAL AND THE STATE TREASURER ARE HEREBY AUTHORIZED
    19  AND DIRECTED TO BORROW, FROM TIME TO TIME, IN ADDITION TO ANY
    20  AUTHORIZATION HERETOFORE OR HEREAFTER ENACTED, ON THE CREDIT OF
    21  THE COMMONWEALTH, SUBJECT TO THE LIMITATIONS PROVIDED IN THE
    22  CURRENT CAPITAL BUDGET, MONEY NOT EXCEEDING IN THE AGGREGATE THE
    23  SUM OF $6,000,000 AS MAY BE FOUND NECESSARY TO CARRY OUT THE
    24  ACQUISITION AND CONSTRUCTION OF THE REDEVELOPMENT ASSISTANCE AND
    25  REDEVELOPMENT ASSISTANCE CAPITAL PROJECTS SPECIFICALLY ITEMIZED
    26  IN A CAPITAL BUDGET.
    27  SECTION 71.2.  APPROPRIATIONS.
    28     (A)  PUBLIC IMPROVEMENT PROJECTS.--THE NET PROCEEDS OF THE     <--
    29  SALE OF THE OBLIGATIONS AUTHORIZED IN THIS ACT ARE HEREBY
    30  APPROPRIATED FROM THE CAPITAL FACILITIES FUND TO THE DEPARTMENT
    19940S1591B2565                 - 69 -

     1  OF GENERAL SERVICES IN THE MAXIMUM AMOUNT OF $3,600,000           <--
     2  $4,600,000 TO BE USED BY IT EXCLUSIVELY TO DEFRAY THE FINANCIAL
     3  COST OF THE PUBLIC IMPROVEMENT PROJECTS SPECIFICALLY ITEMIZED IN
     4  A CAPITAL BUDGET. AFTER RESERVING OR PAYING THE EXPENSES OF THE
     5  SALE OF THE OBLIGATION, THE STATE TREASURER SHALL PAY TO THE
     6  DEPARTMENT OF GENERAL SERVICES THE MONEYS AS REQUIRED AND
     7  CERTIFIED BY IT TO BE LEGALLY DUE AND PAYABLE.
     8     (B)  REDEVELOPMENT ASSISTANCE PROJECTS.--THE NET PROCEEDS OF   <--
     9  THE SALE OF THE OBLIGATIONS AUTHORIZED IN THIS ACT ARE HEREBY
    10  APPROPRIATED FROM THE CAPITAL FACILITIES FUND TO THE DEPARTMENT
    11  OF GENERAL SERVICES IN THE MAXIMUM AMOUNT OF $6,000,000 TO BE
    12  USED BY IT EXCLUSIVELY TO DEFRAY THE FINANCIAL COST OF
    13  REDEVELOPMENT ASSISTANCE AND REDEVELOPMENT ASSISTANCE CAPITAL
    14  PROJECTS SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET. AFTER
    15  RESERVING OR PAYING THE EXPENSES OF THE SALE OF THE OBLIGATION,
    16  THE STATE TREASURER SHALL PAY TO THE DEPARTMENT OF GENERAL
    17  SERVICES THE MONEYS AS REQUIRED AND CERTIFIED BY IT TO BE
    18  LEGALLY DUE AND PAYABLE.
    19  Section 72.  Estimated useful life.
    20     The General Assembly states that the estimated useful life of
    21  the projects itemized in this act is 30 years.
    22  Section 73.  Federal funds.
    23     All moneys received from the Federal Government for the
    24  construction of the projects specifically itemized in this act
    25  are also hereby appropriated for those projects.
    26  Section 74.  Allocation of funds.
    27     Whenever as determined by the Department of Transportation
    28  that the full estimated financial costs of the projects itemized
    29  in this act are not necessary for the proper design, acquisition
    30  or construction of such projects, the excess funds no longer
    19940S1591B2565                 - 70 -

     1  required may be allocated by the Pennsylvania Department of
     2  Transportation to increase the estimated costs of any one or
     3  more of the projects specifically itemized in a capital budget.
     4  Section 75.  Repeal.
     5     Section 8(68)(i)(A) of the act of December 28, 1992            <--
     6  (P.L.1694, No.188), known as the Capital Budget Project
     7  Itemization Act of 1991-1992, is repealed.
     8     SECTION 7(1)(VIII)(A) OF THE ACT OF JULY 8, 1994 (P.L.444,     <--
     9  NO.74), KNOWN AS THE CAPITAL BUDGET PROJECT ITEMIZATION ACT FOR
    10  1994-1995, IS REPEALED.
    11  Section 76.  Effective date.
    12     This act shall take effect immediately.












    B9L72RZ/19940S1591B2565         - 71 -