PRIOR PRINTER'S NO. 772                        PRINTER'S NO. 786

THE GENERAL ASSEMBLY OF PENNSYLVANIA


SENATE BILL

No. 719 Session of 1993


        INTRODUCED BY BODACK, BAKER, BELAN AND BELL, MARCH 23, 1993

        SENATOR BELAN, LABOR AND INDUSTRY, AS AMENDED, MARCH 24, 1993

                                     AN ACT

     1  Amending the act of May 2, 1929 (P.L.1513, No.451), entitled, as
     2     amended, "An act regulating the construction, equipment,
     3     maintenance, operation and inspection of boilers and unfired
     4     pressure vessels; granting certain authority to and imposing
     5     certain duties upon the Department of Labor and Industry;
     6     providing penalties for violations of this act; and repealing
     7     all acts or parts of acts inconsistent with this act,"
     8     defining "field inspection," "power boiler" and "process
     9     boiler"; and further providing for shop and field
    10     inspections.

    11     The General Assembly of the Commonwealth of Pennsylvania
    12  hereby enacts as follows:
    13     Section 1.  Section 1 of the act of May 2, 1929 (P.L.1513,
    14  No.451), referred to as the Boiler Regulation Law, is amended by
    15  adding clauses to read:
    16     Section 1.  Definitions.--Be it enacted, &c., As used in this
    17  act,
    18     * * *
    19     (10)  "Field inspection" shall mean an internal/external
    20  inspection as defined by ANSI/NB 23.
    21     (11)  "Power boiler" shall mean a boiler in which steam or
    22  other vapor is generated at a pressure of more than fifteen psi.

     1     (12)  "Process boiler" shall mean any vessel in which steam
     2  is generated or superheated under pressure or vacuum for use
     3  external to itself by direct and/or indirect application of
     4  heat. The source of heat must be in part or whole from a process
     5  other than the boiler itself. In order to be classified as a
     6  process boiler, the boiler must be directly tied to another
     7  process other than the generation of steam.
     8     * * *
     9     Section 2.  Section 4 of the act, amended December 22, 1959
    10  (P.L.2007, No.733), is amended to read:
    11     Section 4.  Shop Inspection.--Every boiler or unfired
    12  pressure vessel, within the scope of this act, destined for use
    13  in this Commonwealth, shall be inspected during its
    14  construction, by an [inspector who shall have been commissioned
    15  by this Commonwealth to perform such service.] individual who
    16  has a valid National Board of Boiler and Pressure Vessel
    17  Inspectors Commission to perform such inspection. Every such
    18  boiler or unfired pressure vessel which has been so inspected
    19  shall, upon completion, have placed upon it[, in the presence of
    20  the said inspector,] a stamp bearing a symbol and number
    21  authorized by the department for this purpose: Provided, That
    22  any boiler built prior to December 31, 1929, and any unfired
    23  pressure vessel built prior to June 1, 1938, and which have not
    24  been removed from the Commonwealth subsequent to such applicable
    25  date, shall not be required to be shop inspected.
    26     Section 3.  Section 4.1 of the act, amended or added December
    27  22, 1959 (P.L.2007, No.733) and March 18, 1970 (P.L.187, No.72),
    28  is amended to read:
    29     Section 4.1.  Field Inspection.--[(a)  If a boiler or unfired
    30  pressure vessel is insured by a company, authorized to insure
    19930S0719B0786                  - 2 -

     1  boilers in this Commonwealth, against loss from explosion, field
     2  inspection may be made by an inspector in the employ of such
     3  company in accordance with regulations and standards of the
     4  department, and the only fee collectible by the Commonwealth
     5  shall be the certificate fee of three dollars ($3) hereinafter
     6  provided for in this act.
     7     (b)  If such boiler or unfired pressure vessel is not so
     8  insured, then such field inspection shall be made by an
     9  inspector in the employ of the department, and there shall be a
    10  fee charged for each inspection as hereinafter provided for in
    11  this act, except that in the case of a company operating unfired
    12  pressure vessels in this Commonwealth such vessels may be field-
    13  inspected by an inspector in the employ of such company
    14  provided:
    15     (1)  Such an inspector is a full-time employe of the company
    16  for the purpose of making inspections of unfired pressure
    17  vessels used or to be used by such company.
    18     (2)  The inspector has obtained a commission from the
    19  department as required by section 5 of this act.
    20     (3)  Such a company continuously maintains an engineering
    21  division.
    22     (4)  Such pressure vessels are involved in process operations
    23  of which a knowledge of the process is required by the inspector
    24  in addition to that of the construction of the vessels.
    25     (5)  Regular inspection reports are filed with the department
    26  on forms to be supplied by the department, and the only
    27  collectible fee shall be the certificate fee of three dollars
    28  ($3) per vessel hereinafter provided for.
    29     (c)  Boilers, miniature boilers and unfired pressure vessels
    30  shall be inspected as required by the rules and regulations of
    19930S0719B0786                  - 3 -

     1  the department, except that in no case shall regular inspections
     2  be required more than once in every twelve months. Such rules
     3  and regulations may classify boilers, miniature boilers and
     4  unfired pressure vessels by types and prescribe differing
     5  inspection frequencies and inspection requirements for each
     6  type.] (a)  The owner of a boiler or unfired pressure vessel, or  <--
     7  an insurance company, may arrange for the field inspection to be
     8  made by a firm engaged in the making of inspections on a fee or
     9  contract basis.
    10     (b)  Unfired pressure vessels and boilers (A)  IF A BOILER OR  <--
    11  UNFIRED PRESSURE VESSEL IS INSURED BY A COMPANY AUTHORIZED TO
    12  INSURE BOILERS OR UNFIRED PRESSURE VESSELS IN THIS COMMONWEALTH,
    13  THE OWNER MAY REQUEST THAT THE INSURANCE COMPANY ASSURE THAT A
    14  FIELD INSPECTION IS MADE BY AN INSPECTOR.
    15     (B)  BOILERS AND/OR UNFIRED PRESSURE VESSELS may be field
    16  inspected by an inspector in the employ of the owner if:
    17     (1)  the inspector is a full-time employe of the owner for
    18  the purpose of making inspections of BOILERS AND/OR unfired       <--
    19  pressure vessels used or to be used by the owner;
    20     (2)  the inspector has obtained a commission from the
    21  department, as required under section 5 of the act;
    22     (3)  the owner continuously maintains an engineering
    23  division;
    24     (4)  the BOILERS AND/OR unfired pressure vessels are involved  <--
    25  in process operations, of which a knowledge of the process, in
    26  addition to that of the construction of the vessels, is required
    27  by the inspector; and
    28     (5)  the owner files regular field inspection reports with
    29  the department, in a form approved by the department, and pays
    30  the certificate fee set by the department through regulation.
    19930S0719B0786                  - 4 -

     1     (c)  If the owner does not assure that a field inspection is
     2  made by an inspector, the boiler or unfired pressure vessel
     3  shall be inspected by a department inspector. The owner shall be
     4  responsible to pay the department a fee for such inspection. If
     5  the owner fails to assure a field inspection, the owner shall be
     6  subject to appropriate enforcement action, as provided in this
     7  act.
     8     (d)  Regular field inspections shall be made as follows:
     9     (1)  Low pressure steam vapor, hot water heating and hot       <--
    10  water supply boilers shall be inspected every two years.
    11     (2)  Unfired pressure vessels shall be inspected every three
    12  years.
    13     (3)  The department, by regulation, may adopt different
    14  inspection frequencies for specific classifications of boilers,
    15  miniature boilers and unfired pressure vessels.
    16     (4)  Alternate internal inspection requirements under
    17  subsections (e) and (f).
    18     (1)  POWER BOILERS AND PROCESS BOILERS SHALL BE FIELD          <--
    19  INSPECTED ONCE EVERY TWELVE MONTHS EXCEPT AS PROVIDED IN
    20  SUBSECTIONS (E) AND (F).
    21     (2)  LOW PRESSURE STEAM VAPOR, HOT WATER HEATING AND HOT
    22  WATER SUPPLY BOILERS SHALL BE FIELD INSPECTED EVERY TWO YEARS.
    23     (3)  UNFIRED PRESSURE VESSELS SHALL BE INSPECTED EVERY THREE
    24  YEARS.
    25     (4)  THE DEPARTMENT, BY REGULATION, MAY ADOPT DIFFERENT
    26  INSPECTION FREQUENCIES FOR SPECIFIC CLASSIFICATIONS OF BOILERS,
    27  MINIATURE BOILERS AND UNFIRED PRESSURE VESSELS.
    28     (e)  Power boiler internal inspections may be extended to
    29  twenty-four months, if the following requirements are met:
    30     (1)  Continuous boiler water treatment under the direct
    19930S0719B0786                  - 5 -

     1  supervision of persons trained and experienced in water
     2  treatment for the purpose of controlling and limiting corrosion
     3  and deposits.
     4     (2)  Recordkeeping available for review showing:
     5     (i)  The date and time the boiler is out of service and the
     6  reason therefore.
     7     (ii)  Daily analysis of water samples that adequately show
     8  the conditions of the water and any elements or characteristics
     9  which are capable of producing corrosion or other deterioration
    10  to the boiler or its parts.
    11     (3)  Annual external inspections are performed by a
    12  Commonwealth commissioned inspector, which shall include a
    13  review of items under clauses (1) and (2).
    14     (4)  The boiler is operated under direct supervision of
    15  persons competent in all aspects of boiler operations.
    16     (5)  INSPECTION RECORDS DEMONSTRATE THAT NO SIGNIFICANT        <--
    17  SCALING, CORROSION, EROSION OR OVERHEATING HAS OCCURRED.
    18     (f)  Process boiler internal inspections may be extended to
    19  sixty months, if:
    20     (1)  Conditions under subsection (e)(1), (2)(i) and (ii) and   <--
    21  (3) CLAUSE (1), SUBCLAUSES (I) AND (II) OF CLAUSE (2) AND         <--
    22  CLAUSES (3) AND (5) OF SUBSECTION (E) are met.
    23     (2)  The boiler is in continuous operation and is fully
    24  attended.
    25     (3)  An inspection program of historical inspection records    <--
    26  demonstrates that no significant scaling, corrosion, erosion or
    27  overheating has occurred.
    28     (g)  The department may, upon the request of the owner, user
    29  or insurer of the boiler or unfired pressure vessel, alter the
    30  inspection schedule for a period of not more than six months.
    19930S0719B0786                  - 6 -

     1     (h)  The department upon written notification TO THE OWNER     <--
     2  may limit issuance of the certificate of operation based on
     3  conditions reported by a department inspector.
     4     (i)  Holders of current certificates of operation for process
     5  boilers or power boilers may apply for extension of their
     6  certificates by a written request to the department. Such
     7  request must include an assurance that all new requirements
     8  specified in this act are being met. The department may, at its
     9  option, carry out any necessary inspections to verify the
    10  accuracy of this assurance.
    11     Section 4.  This act shall take effect in 60 days              <--
    12  IMMEDIATELY.                                                      <--












    C19L35JRW/19930S0719B0786        - 7 -