PRINTER'S NO. 2236

THE GENERAL ASSEMBLY OF PENNSYLVANIA


SENATE BILL

No. 1746 Session of 1992


        INTRODUCED BY CORMAN, FISHER AND STOUT, MAY 22, 1992

        REFERRED TO TRANSPORTATION, MAY 22, 1992

                                  A SUPPLEMENT

     1  To the act of December 8, 1982 (P.L.848, No.235), entitled "An
     2     act providing for the adoption of capital projects related to
     3     the repair, rehabilitation or replacement of highway bridges
     4     to be financed from current revenue or by the incurring of
     5     debt and capital projects related to highway and safety
     6     improvement projects to be financed from current revenue of
     7     the Motor License Fund," itemizing bridge projects.

     8     The General Assembly of the Commonwealth of Pennsylvania
     9  hereby enacts as follows:
    10  Section 1.  Short title.
    11     This act shall be known and may be cited as the Highway-
    12  Railroad and Highway Bridge Capital Budget Supplemental Act for
    13  1991-1992.
    14  Section 2.  Definitions.
    15     The following words and phrases when used in this act shall
    16  have the meanings given to them in this section unless the
    17  context clearly indicates otherwise:
    18     "Account."  The Highway Bridge Improvement Restricted Account
    19  within the Motor License Fund.
    20     "Capital project."  A capital project as defined in section

     1  1602-B of the act of April 9, 1929 (P.L.343, No.176), known as
     2  The Fiscal Code, and shall include a county or municipal bridge
     3  rehabilitation, replacement or improvement project as set forth
     4  in this act.
     5     "Department."  The Department of Transportation of the
     6  Commonwealth.
     7     "Secretary."  The Secretary of Transportation of the
     8  Commonwealth.
     9  Section 3.  Total authorization for bridge projects.
    10     (a)  Total projects.--The total authorization for the costs
    11  of the projects itemized pursuant to this act and to be financed
    12  from current revenue or by the incurring of debt shall be
    13  $952,067,000.
    14     (b)  State projects.--The authorization for capital projects
    15  in the category of highway projects to be constructed by the
    16  department, its successors or assigns, and to be financed by the
    17  incurring of debt or from the highway account, itemized in this
    18  act under the category of State bridges, is $596,448,000.
    19     (c)  Non-State projects.--The authorization for non-State
    20  highway bridge projects to be constructed by municipalities and
    21  to be financed in part with grants not exceeding 80% of the non-
    22  Federal share of the costs made to the local government
    23  municipalities by the department from revenues deposited in the
    24  account itemized in this act under the category of local
    25  bridges, is $355,619,000.
    26  Section 4.  Itemization of bridge projects.
    27     The individual capital projects in the category of highway
    28  projects to be constructed by the department, its successors or
    29  assigns, and to be financed from current revenue or by the
    30  incurring of debt are hereby itemized, together with their
    19920S1746B2236                  - 2 -

     1  estimated financial costs, in the following sections.
     2  Section 5.  Adams County.
     3     (a)  Local Bridges (Reserved)
     4     (b)  State Bridges
     5         (1)  S.R.3038, Crooked Creek Road over
     6             Marsh Creek, Franklin Township, Bridge
     7             Replacement                                   885,000
     8             (Base Construction Allocation -
     9             $750,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $125,000)
    12         (2)  S.R.0234, King Street over Beaver
    13             Creek, East Berlin Borough, Bridge
    14             Replacement                                   746,000
    15             (Base Construction Allocation -
    16             $640,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $96,000)
    19         (3)  S.R.3005, Pumping Station Road over
    20             Plum Creek, Freedom Township, Bridge
    21             Replacement                                   246,000
    22             (Base Construction Allocation -
    23             $212,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $24,000)
    26         (4)  S.R.2012, Bridge over Alloway Creek,
    27             Mt. Joy and Germany Townships, Bridge
    28             Replacement                                   510,000
    29             (Base Construction Allocation -
    30             $436,000)
    19920S1746B2236                  - 3 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $64,000)
     3         (5)  S.R.4002, Bridge over Gettysburg
     4             Railroad, Butler Township, Bridge
     5             Replacement                                 1,026,000
     6             (Base Construction Allocation -
     7             $889,000)
     8             (Land Allocation - $5,000)
     9             (Design and Contingencies - $132,000)
    10         (6)  Pa.194, Bridge over Tributary, Beaver
    11             Creek, Abbottstown Borough, Bridge
    12             Replacement                                   245,000
    13             (Base Construction Allocation -
    14             $196,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $39,000)
    17  Section 6.  Allegheny County.
    18     (a)  Local Bridges
    19         (1)  Wilkins Township, Ivy Street Bridge,
    20             Bridge Replacement                            175,000
    21             (Base Construction Allocation -
    22             $175,000)
    23         (2)  Wilkins Township, Russell Lane Bridge,
    24             Bridge Replacement                            175,000
    25             (Base Construction Allocation -
    26             $175,000)
    27         (3)  Wilkins Township, Baker Street Bridge,
    28             Bridge Replacement                            250,000
    29             (Base Construction Allocation -
    30             $250,000)
    19920S1746B2236                  - 4 -

     1         (4)  Shaler Township, Anderson Road Bridge
     2             No.11 (WB11), Bridge Replacement              380,000
     3             (Base Construction Allocation -
     4             $300,000)
     5             (Land Allocation - $5,000)
     6             (Design and Contingencies - $75,000)
     7         (5)  Crescent Township, Riverview Road
     8             Bridge No.6 (FU06), Bridge Replacement        755,000
     9             (Base Construction Allocation -
    10             $650,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $95,000)
    13         (6)  Pitcairn Borough, 2nd Street Bridge
    14             over Dirty Camp Run Center and Wall
    15             Avenues, Bridge Replacement                   175,000
    16             (Base Construction Allocation -
    17             $175,000)
    18         (7)  Rankin Borough, Kenmawr Avenue Bridge,
    19             Bridge Replacement                            175,000
    20             (Base Construction Allocation -
    21             $175,000)
    22         (8)  Wall Borough, Spring Hill Bridge over
    23             Conrail, Wall Avenue and Pa. Route 30,
    24             Bridge Replacement                          2,882,000
    25             (Base Construction Allocation -
    26             $2,882,000)
    27         (9)  Braddock and North Braddock Boroughs,
    28             Overland Bridge over Conrail, Bridge
    29             Replacement                                   818,000
    30             (Base Construction Allocation -
    19920S1746B2236                  - 5 -

     1             $818,000)
     2         (10)  Pleasant Hills Borough, Pleasant
     3             Hills Boulevard Bridge No.02, Bridge
     4             Replacement                                 1,000,000
     5             (Base Construction Allocation -
     6             $400,000)
     7             (Land Allocation - $500,000)
     8             (Design and Contingencies - $100,000)
     9         (11)  Emsworth Borough, Gibson Street over
    10             Lowries Run, Bridge Replacement               220,000
    11             (Base Construction Allocation -
    12             $200,000)
    13             (Design and Contingencies - $20,000)
    14         (12)  West View Borough, Martsolf Avenue
    15             Bridge over Center Avenue, Bridge
    16             Replacement                                   660,000
    17             (Base Construction Allocation -
    18             $600,000)
    19             (Design and Contingencies - $60,000)
    20         (13)  West View Borough, Ridgewood Avenue
    21             Bridge over Center Avenue, Bridge
    22             Replacement                                   660,000
    23             (Base Construction Allocation -
    24             $600,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $50,000)
    27         (14)  Ben Avon Borough, Spruce Run Road
    28             (now Alder Drive and Avalon Borough
    29             Building), Bridge Replacement                  70,000
    30         (15)  Ben Avon Borough, Spruce Run Road
    19920S1746B2236                  - 6 -

     1             near Building Mill Lumber Company,
     2             Bridge Replacement                             70,000
     3             (Base Construction Allocation -
     4             $70,000)
     5         (16)  Emsworth Borough, Herron Avenue over
     6             Lowries Run, Bridge Replacement               560,000
     7             (Base Construction Allocation -
     8             $500,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $50,000)
    11         (17)  City of Pittsburgh, Greenfield Avenue
    12             Bridge No.39, Bridge Replacement              380,000
    13             (Base Construction Allocation -
    14             $300,000)
    15             (Land Allocation - $5,000)
    16             (Design and Contingencies - $75,000)
    17         (18)  City of Pittsburgh, Corliss Tunnel
    18             No.18, Bridge Replacement                   1,575,000
    19             (Base Construction Allocation -
    20             $1,400,000)
    21             (Design and Contingencies - $175,000)
    22         (19)  City of Pittsburgh, Mission Street
    23             Bridge East No.60, Bridge Replacement         880,000
    24             (Base Construction Allocation -
    25             $800,000)
    26             (Design and Contingencies - $80,000)
    27         (20)  City of Pittsburgh, Mission Street
    28             Bridge West No.60, Bridge Replacement       2,900,000
    29             (Base Construction Allocation -
    30             $1,400,000)
    19920S1746B2236                  - 7 -

     1             (Design and Contingencies - $1,500,000)
     2         (21)  City of Pittsburgh, Acrata Way Bridge
     3             No.4, Bridge Replacement                    1,115,000
     4             (Base Construction Allocation -
     5             $1,000,000)
     6             (Design and Contingencies - $115,000)
     7         (22)  Port Authority of Allegheny County,
     8             Lowries Run Viaduct BMS
     9             No.02742900009004, Emsworth Bridge,
    10             Bridge Replacement                            126,000
    11             (Base Construction Allocation -
    12             $126,000)
    13         (23)  Bethel Park Borough, Brownsville and
    14             Library Roads Bridge No.6 over Piney
    15             Fork Creek, Bridge Replacement                490,000
    16             (Base Construction Allocation -
    17             $385,000)
    18             (Land Allocation - $5,000)
    19             (Design and Contingencies - $100,000)
    20         (24)  Bethel Park Borough, Kings School
    21             Road Bridge (PY02) over North Branch
    22             Piney Fork, Bridge Replacement                265,000
    23             (Base Construction Allocation -
    24             $225,000)
    25             (Design and Contingencies - $40,000)
    26         (25)  Bethel Park Borough, Bethel Church
    27             Road Bridge No.2 over Graesers' Run,
    28             Bridge Replacement                            250,000
    29             (Base Construction Allocation -
    30             $200,000)
    19920S1746B2236                  - 8 -

     1             (Design and Contingencies - $50,000)
     2         (26)  Upper St. Clair Township, Painters'
     3             Run Bridge No.2, Bridge Rehabilitation         95,000
     4             (Base Construction Allocation -
     5             $75,000)
     6             (Design and Contingencies - $20,000)
     7         (27)  Upper St. Clair Township, Painters'
     8             Run Bridge No.8, Bridge Replacement           290,000
     9             (Base Construction Allocation -
    10             $250,000)
    11             (Design and Contingencies - $40,000)
    12         (28)  City of Pittsburgh, Mcardle Viaduct
    13             No.2, Bridge Rehabilitation                 2,526,000
    14             (Base Construction Allocation -
    15             $2,246,000)
    16             (Design and Contingencies - $280,000)
    17         (29)  Shaler Township, Hodil Street Bridge
    18             1,000 Feet Northeast of Thompson Run
    19             Road, Bridge Replacement                      250,000
    20             (Base Construction Allocation -
    21             $200,000)
    22             (Land Allocation - $25,000)
    23             (Design and Contingencies - $25,000)
    24     (b)  State Bridges
    25         (1)  S.R.2017, Industry Road Bridge over
    26             Boyds Hollow Road, Elizabeth Township,
    27             Bridge Replacement                            500,000
    28             (Base Construction Allocation -
    29             $300,000)
    30             (Land Allocation - $100,000)
    19920S1746B2236                  - 9 -

     1             (Design and Contingencies - $100,000)
     2         (2)  S.R.0019, Marshall Avenue Ramp over
     3             Chateau Street, City of Pittsburgh,
     4             Bridge Rehabilitation                       4,120,000
     5             (Base Construction Allocation -
     6             $3,700,000)
     7             (Land Allocation - $50,000)
     8             (Design and Contingencies - $370,000)
     9         (3)  S.R.0910, Indianola Road Bridge over
    10             Deer Creek, Harmar Township, Bridge
    11             Rehabilitation                              1,050,000
    12             (Base Construction Allocation -
    13             $850,000)
    14             (Land Allocation - $50,000)
    15             (Design and Contingencies - $150,000)
    16         (4)  S.R.3001, Railroad Overhead over
    17             Millers Run Road, South Fayette
    18             Township, Bridge Replacement                  300,000
    19             (Base Construction Allocation -
    20             $150,000)
    21             (Land Allocation - $50,000)
    22             (Design and Contingencies - $100,000)
    23         (5)  S.R.3026, Millers Run Road, Bridge
    24             over Millers Run, South Fayette
    25             Township, Bridge Replacement                  600,000
    26             (Base Construction Allocation -
    27             $400,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $150,000)
    30         (6)  S.R.0366, Tarentum Bridge, Tarentum
    19920S1746B2236                 - 10 -

     1             Borough and City of New Kensington,
     2             Bridge Painting                             3,320,000
     3             (Base Construction Allocation -
     4             $3,000,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $300,000)
     7         (7)  Crescent Street Bridge over Pine
     8             Creek, Borough of Etna, Bridge
     9             Replacement                                   770,000
    10             (Base Construction Allocation -
    11             $654,000)
    12             (Land Allocation - $39,000)
    13             (Design and Contingencies - $77,000)
    14         (8)  Montour Railroad, Trestle over
    15             Brightwood Road, Bethel Park Borough,
    16             Bridge Removal                                180,000
    17             (Base Construction Allocation -
    18             $160,000)
    19             (Design and Contingencies - $20,000)
    20         (9)  Bridgeville/Bower Hill Road, Bridge
    21             Number 1 over McLaughlin Run, Upper St.
    22             Clair Township, Bridge Replacement            475,000
    23             (Base Construction Allocation -
    24             $380,000)
    25             (Land Allocation - $5,000)
    26             (Design and Contingencies - $90,000)
    27         (10)  S.R.0051, Bridge over Lewis Run,
    28             Jefferson Borough, Bridge Replacement         710,000
    29             (Base Construction Allocation -
    30             $600,000)
    19920S1746B2236                 - 11 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $100,000)
     3         (11)  Turnpike Ramp Bridge over U.S.22,
     4             Monroeville Borough, Bridge
     5             Rehabilitation                                109,000
     6             (Base Construction Allocation -
     7             $99,000)
     8             (Design and Contingencies - $10,000)
     9         (12)  Turnpike Ramp Bridge over U.S.22
    10             Business, Monroeville Borough, Bridge
    11             Rehabilitation                                401,000
    12             (Base Construction Allocation -
    13             $365,000)
    14             (Design and Contingencies - $36,000)
    15         (13)  Wabash Bridge over Monongahela River,
    16             City of Pittsburgh, New Bridge
    17             Construction                               35,000,000
    18             (Base Construction Allocation -
    19             $30,000,000)
    20             (Land Allocation - $2,000,000)
    21             (Design and Contingencies - $3,000,000)
    22  Section 7.  Armstrong County.
    23     (a)  Local Bridges
    24         (1)  Wayne Township, T-738, Cogler Bridge
    25             over South Fork Pine Creek, Bridge
    26             Replacement                                   476,000
    27             (Base Construction Allocation -
    28             $421,000)
    29             (Land Allocation - $15,000)
    30             (Design and Contingencies - $40,000)
    19920S1746B2236                 - 12 -

     1         (2)  Valley Township, T-590, Pine Furnace
     2             Bridge over South Fork Pine Creek,
     3             Bridge Replacement                            554,000
     4             (Base Construction Allocation -
     5             $499,000)
     6             (Land Allocation - $15,000)
     7             (Design and Contingencies - $40,000)
     8         (3)  East Franklin Township, T-530, Glade
     9             Run Bridge over Glade Run, Bridge
    10             Replacement                                   299,000
    11             (Base Construction Allocation -
    12             $256,000)
    13             (Land Allocation - $8,000)
    14             (Design and Contingencies - $35,000)
    15         (4)  Boggs Township, T-529, South Fork Pine
    16             Creek Bridge over South Fork Pine
    17             Creek, Bridge Replacement                     567,000
    18             (Base Construction Allocation -
    19             $512,000)
    20             (Land Allocation - $15,000)
    21             (Design and Contingencies - $40,000)
    22         (5)  Washington Township, T-396, Simpson
    23             Bridge over Huling Run, Bridge
    24             Replacement                                   347,000
    25             (Base Construction Allocation -
    26             $302,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $35,000)
    29         (6)  Plum Creek Township, Johnston Bridge
    30             over South Branch Plum Creek, Bridge
    19920S1746B2236                 - 13 -

     1             Replacement                                   470,000
     2             (Base Construction Allocation -
     3             $415,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $45,000)
     6         (7)  Plum Creek Township, Gastown Bridge
     7             over Plum Creek, Bridge Replacement           513,000
     8             (Base Construction Allocation -
     9             $463,000)
    10             (Land Allocation - $5,000)
    11             (Design and Contingencies - $45,000)
    12     (b)  State Bridges
    13         (1)  S.R.4023 Bridge over Limestone Run,
    14             East Franklin Township, Bridge
    15             Construction                                  590,000
    16             (Base Construction Allocation -
    17             $500,000)
    18             (Land Allocation - $30,000)
    19             (Design and Contingencies - $60,000)
    20         (2)  S.R.1040 Bridge over Conrail Railroad,
    21             Kittanning Borough, Bridge
    22             Construction                                1,640,000
    23             (Base Construction Allocation -
    24             $1,500,000)
    25             (Land Allocation - $40,000)
    26             (Design and Contingencies - $100,000)
    27         (3)  S.R.3004, Cornplanter Run Bridge over
    28             Cornplanter Run, South Buffalo
    29             Township, Bridge Replacement                  245,000
    30             (Base Construction Allocation -
    19920S1746B2236                 - 14 -

     1             $200,000)
     2             (Land Allocation - $5,000)
     3             (Design and Contingencies - $40,000)
     4         (4)  S.R.4023, Tarrtown Road Bridge over
     5             Limestone Run, East Franklin Township,
     6             Bridge Replacement                          1,300,000
     7             (Base Construction Allocation -
     8             $1,000,000)
     9             (Land Allocation - $100,000)
    10             (Design and Contingencies - $200,000)
    11  Section 8.  Beaver County.
    12     (a)  Local Bridges
    13         (1)  Beaver Falls and New Brighton
    14             Boroughs, Tenth Street Bridge over
    15             Beaver River, Bridge Removal                2,000,000
    16             (Base Construction Allocation -
    17             $1,980,000)
    18             (Design and Contingencies - $20,000)
    19         (2)  Economy Borough, T-606 Tevebaugh
    20             Bridge No.5 over Tevebaugh Run, Bridge
    21             Replacement                                   205,000
    22             (Base Construction Allocation -
    23             $143,000)
    24             (Land Allocation - $55,000)
    25             (Design and Contingencies - $7,000)
    26         (3)  City of Aliquippa, Hollywood Bridge
    27             over Tributary of Logtown Run, Bridge
    28             Replacement                                 1,109,000
    29             (Base Construction Allocation -
    30             $1,023,000)
    19920S1746B2236                 - 15 -

     1             (Design and Contingencies - $86,000)
     2         (4)  Bridgewater Borough and Brighton
     3             Township, Beaver Hollow Road Bridge
     4             over PL&E Railroad, Bridge Replacement      8,000,000
     5             (Base Construction Allocation -
     6             $7,000,000)
     7             (Land Allocation - $400,000)
     8             (Design and Contingencies - $600,000)
     9     (b)  State Bridges
    10         (1)  S.R.0060, Beaver Valley Expressway
    11             over Brady's Run Road, Brighton
    12             Township, Bridge Rehabilitation               535,000
    13             (Base Construction Allocation -
    14             $500,000)
    15             (Land Allocation - $5,000)
    16             (Design and Contingencies - $30,000)
    17         (2)  S.R.0060, Vanport Bridge over Ohio
    18             River, Vanport Township, Bridge
    19             Rehabilitation                              2,200,000
    20             (Base Construction Allocation -
    21             $2,000,000)
    22             (Land Allocation - $50,000)
    23             (Design and Contingencies - $150,000)
    24         (3)  S.R.0051, Taggert Road Bridge over
    25             Conrail, Darlington Township, Bridge
    26             Replacement                                 2,000,000
    27             (Base Construction Allocation -
    28             $1,800,000)
    29             (Land Allocation - $100,000)
    30             (Design and Contingencies - $100,000)
    19920S1746B2236                 - 16 -

     1         (4)  S.R.4039, Bridge over Six Mile Run,
     2             Brighton Township, Bridge Replacement         200,000
     3             (Base Construction Allocation -
     4             $160,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $20,000)
     7         (5)  S.R.4031 over Brady Run Tributary,
     8             Brighton Township, Bridge Replacement         212,000
     9             (Base Construction Allocation -
    10             $180,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $22,000)
    13         (6)  S.R.0068, McKinleys Run Bridge over
    14             McKinleys Run, Rochester Township,
    15             Bridge Replacement                            201,000
    16             (Base Construction Allocation -
    17             $177,000)
    18             (Land Allocation - $2,000)
    19             (Design and Contingencies - $22,000)
    20         (7)  S.R.0168, Bealer Run, Ohioville
    21             Borough, Bridge Replacement                   286,000
    22             (Base Construction Allocation -
    23             $250,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $26,000)
    26         (8)  Ambridge - Aliquippa Bridge over Ohio
    27             River, Ambridge and Aliquippa Boroughs,
    28             New Bridge Construction                     5,000,000
    29  Section 9.  Bedford County.
    30     (a)  Local Bridges
    19920S1746B2236                 - 17 -

     1         (1)  Southampton Township, T-306, Township
     2             Bridge No.1 over Black Valley Creek,
     3             Bridge Replacement                            360,000
     4             (Base Construction Allocation -
     5             $300,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $50,000)
     8     (b)  State Bridges (Reserved)
     9  Section 10.  Berks County.
    10     (a)  Local Bridges
    11         (1)  Marion Township, T-498 Scharff Road
    12             over Tulpehocken Creek, Bridge
    13             Replacement                                   740,000
    14             (Base Construction Allocation -
    15             $630,000)
    16             (Land Allocation - $40,000)
    17             (Design and Contingencies - $70,000)
    18         (2)  Oley Township, T-595 Yoder Road over
    19             Oysterville Creek, Bridge Replacement         250,000
    20             (Base Construction Allocation -
    21             $210,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $30,000)
    24         (3)  Wyomissing Borough, Lauers Lane over
    25             Wyomissing Creek, Bridge Replacement          320,000
    26             (Base Construction Allocation -
    27             $275,000)
    28             (Land Allocation - $15,000)
    29             (Design and Contingencies - $30,000)
    30     (b)  State Bridges
    19920S1746B2236                 - 18 -

     1         (1)  S.R.0222 under S.R.0422, City of
     2             Reading, Bridge Replacement                   163,000
     3             (Base Construction Allocation -
     4             $148,000)
     5             (Design and Contingencies - $15,000)
     6         (2)  S.R.0222 under S.R.0422, City of
     7             Reading, Bridge Replacement                   262,000
     8             (Base Construction Allocation -
     9             $238,000)
    10             (Design and Contingencies - $24,000)
    11         (3)  S.R.0501 over I-78, Bethel Township,
    12             Bridge Replacement                          1,100,000
    13             (Base Construction Allocation -
    14             $1,000,000)
    15             (Design and Contingencies - $100,000)
    16         (4)  S.R.0422 over Railroad, City of
    17             Reading, Bridge Replacement                   410,000
    18             (Base Construction Allocation -
    19             $372,000)
    20             (Design and Contingencies - $38,000)
    21         (5)  S.R.0222 over Railroad, West Reading
    22             Borough, Bridge Replacement                 2,187,000
    23             (Base Construction Allocation -
    24             $1,988,000)
    25             (Design and Contingencies - $199,000)
    26         (6)  S.R.0422 over Schuylkill River, City
    27             of Reading, Bridge Replacement              2,033,000
    28             (Base Construction Allocation -
    29             $1,848,000)
    30             (Design and Contingencies - $185,000)
    19920S1746B2236                 - 19 -

     1         (7)  S.R.0422 over Railroad, Cumru
     2             Township, Bridge Replacement                  527,000
     3             (Base Construction Allocation -
     4             $479,000)
     5             (Design and Contingencies - $48,000)
     6         (8)  S.R.0422 over Schuylkill River, Cumru
     7             Township, Bridge Replacement                1,345,000
     8             (Base Construction Allocation -
     9             $1,222,000)
    10             (Design and Contingencies - $123,000)
    11         (9)  S.R.2032, Hill Church Road over a
    12             Tributary of West Swamp Creek, Bridge
    13             Replacement                                   215,000
    14             (Base Construction Allocation -
    15             $175,000)
    16             (Land Allocation - $20,000)
    17             (Design and Contingencies - $20,000)
    18  Section 11.  Blair County.
    19     (a)  Local Bridges
    20         (1)  Frankstown Township, T-444, Falling
    21             Springs, South of Canoe Creek, Bridge
    22             Replacement                                   270,000
    23             (Base Construction Allocation -
    24             $225,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $25,000)
    27         (2)  Logan Township, 14th Avenue over Mill
    28             Run Steam, Bridge Replacement                 200,000
    29             (Base Construction Allocation -
    30             $175,000)
    19920S1746B2236                 - 20 -

     1             (Design and Contingencies - $25,000)
     2         (3)  North Woodbury Township, T-338,
     3             Central High Road near Martinsburg
     4             Disposal Plant, Bridge Replacement             90,000
     5             (Base Construction Allocation -
     6             $75,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $5,000)
     9     (b)  State Bridges
    10         (1)  S.R.0022, Segment 0350, Offset 0000,
    11             Berwind Bridge over Brush Run,
    12             Frankstown Township, Bridge
    13             Replacement                                   760,000
    14             (Base Construction Allocation -
    15             $650,000)
    16             (Land Allocation - $25,000)
    17             (Design and Contingencies - $85,000)
    18         (2)  S.R.0036, Segment 0120, Offset 0000,
    19             North Roaring Spring Bridge over Halter
    20             Creek, Taylor Township, Bridge
    21             Replacement                                   950,000
    22             (Base Construction Allocation -
    23             $800,000)
    24             (Land Allocation - $50,000)
    25             (Design and Contingencies - $100,000)
    26         (3)  S.R.0220, Segment 0190, Offset 0000,
    27             Newry Bridge over Poplar Run, Newry
    28             Borough, Bridge Rehabilitation                750,000
    29             (Base Construction Allocation -
    30             $575,000)
    19920S1746B2236                 - 21 -

     1             (Land Allocation - $100,000)
     2             (Design and Contingencies - $75,000)
     3         (4)  S.R.2010, Segment 0010, Offset 0643,
     4             East Freedom Bridge over Frankstown
     5             Branch of Juniata River, Freedom
     6             Township, Bridge Replacement                  920,000
     7             (Base Construction Allocation -
     8             $790,000)
     9             (Land Allocation - $25,000)
    10             (Design and Contingencies - $105,000)
    11         (5)  S.R.2014, Segment 0040, Offset 0000,
    12             Sam Rea Bridge over the Beaverdam
    13             Branch of Juniata River, Hollidaysburg
    14             Borough, Bridge Rehabilitation              1,210,000
    15             (Base Construction Allocation -
    16             $985,000)
    17             (Land Allocation - $100,000)
    18             (Design and Contingencies - $125,000)
    19         (6)  S.R.2014, Segment 0070, Offset 0000,
    20             Loop Bridge over the Frankstown Branch
    21             of the Juniata River, Blair Township,
    22             Bridge Rehabilitation                       1,185,000
    23             (Base Construction Allocation -
    24             $985,000)
    25             (Land Allocation - $75,000)
    26             (Design and Contingencies - $125,000)
    27  Section 12.  Bradford County.
    28     (a)  Local Bridges
    29         (1)  Rome Township, T-748, Bridge of
    30             Bullard Creek, Bridge Replacement             280,000
    19920S1746B2236                 - 22 -

     1             (Base Construction Allocation -
     2             $240,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $30,000)
     5         (2)  Sheshequin Township, T-730, Bridge
     6             No.26 over Spalding Creek, Bridge
     7             Replacement                                   263,000
     8             (Base Construction Allocation -
     9             $214,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $39,000)
    12         (3)  West Burlington Township, T-328 Bridge
    13             No.8 over Sugar Creek, Bridge
    14             Replacement                                   317,000
    15             (Base Construction Allocation -
    16             $260,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $47,000)
    19         (4)  Canton Township, T-310, Bridge No.11
    20             over Towanda Creek, Bridge Replacement        216,000
    21             (Base Construction Allocation -
    22             $174,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $32,000)
    25         (5)  Monroe Township, T-412, Bridge No.20
    26             over South Branch Towanda Creek, Bridge
    27             Replacement                                   313,000
    28             (Base Construction Allocation -
    29             $256,000)
    30             (Land Allocation - $10,000)
    19920S1746B2236                 - 23 -

     1             (Design and Contingencies - $47,000)
     2         (6)  South Creek Township, T-78, Bridge
     3             No.27 over South Creek,  Bridge
     4             Replacement                                   166,000
     5             (Base Construction Allocation -
     6             $131,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $25,000)
     9         (7)  Leroy Township, T-330, Bridge No.16
    10             over Towanda Creek, Bridge Replacement        443,000
    11             (Base Construction Allocation -
    12             $367,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $66,000)
    15         (8)  Windham Township, T-760, Bridge No.40
    16             over Wappasening Creek, Bridge
    17             Replacement                                   468,000
    18             (Base Construction Allocation -
    19             $388,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $70,000)
    22         (9)  Wells Township, T-751, Bridge No.37
    23             over Beckwith Creek, Bridge
    24             Replacement                                   302,000
    25             (Base Construction Allocation -
    26             $247,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $45,000)
    29         (10)  Rome Township, T-764, Bridge No.44
    30             over Bullard Creek, Bridge Replacement        306,000
    19920S1746B2236                 - 24 -

     1             (Base Construction Allocation -
     2             $250,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $46,000)
     5         (11)  North Towanda Township, T-545, Bridge
     6             No.32 over Sugar Creek, Bridge
     7             Replacement                                   450,000
     8             (Base Construction Allocation -
     9             $372,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $68,000)
    12         (12)  Burlington Township, T-552, Bridge
    13             No.6 over Sugar Creek, Bridge
    14             Replacement                                   454,000
    15             (Base Construction Allocation -
    16             $376,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $68,000)
    19         (13)  Leroy Township, T-320, Bridge No.18
    20             over Towanda Creek, Bridge Replacement        288,000
    21             (Base Construction Allocation -
    22             $235,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $43,000)
    25     (b)  State Bridges
    26         (1)  S.R.3012, Tributary to Towanda Creek,
    27             Canton Township, Bridge Replacement           319,000
    28             (Base Construction Allocation -
    29             $255,000)
    30             (Land Allocation - $16,000)
    19920S1746B2236                 - 25 -

     1             (Design and Contingencies - $48,000)
     2         (2)  S.R.0220, Murray Creek Bridge over
     3             Murray Creek, Athens Township, Bridge
     4             Replacement                                   682,000
     5             (Base Construction Allocation -
     6             $546,000)
     7             (Land Allocation - $34,000)
     8             (Design and Contingencies - $102,000)
     9  Section 13.  Bucks County.
    10     (a)  Local Bridges (Reserved)
    11     (b)  State Bridges
    12         (1)  S.R.0032, River Road Bridge at Fleecy
    13             Dale Road over Paunacussing Creek,
    14             Solebury Township, Bridge Replacement       1,100,000
    15             (Base Construction Allocation -
    16             $1,000,000)
    17             (Design and Contingencies - $100,000)
    18         (2)  S.R.1014, Geigel Hill Bridge over
    19             Branch of Swamp Creek, Tinicum
    20             Township, Bridge Rehabilitation               242,000
    21             (Base Construction Allocation -
    22             $200,000)
    23             (Land Allocation - $5,000)
    24             (Design and Contingencies - $37,000)
    25         (3)  S.R.1016, Delaware Road Bridge over
    26             Pennsylvania Canal, Rigelsville
    27             Borough, Bridge Replacement                 2,133,000
    28             (Base Construction Allocation -
    29             $1,688,000)
    30             (Land Allocation - $175,000)
    19920S1746B2236                 - 26 -

     1             (Design and Contingencies - $270,000)
     2         (4)  S.R.2035, Richliew Road Bridge over
     3             Poquessing Creek, Bensalem Township,
     4             Bridge Replacement                            354,000
     5             (Base Construction Allocation -
     6             $295,000)
     7             (Land Allocation - $30,000)
     8             (Design and Contingencies - $29,000)
     9         (5)  S.R.2095, Dark Hollow Road Bridge over
    10             Neshaminy Creek, Buckingham Township,
    11             Bridge Replacement                            926,000
    12             (Base Construction Allocation -
    13             $815,000)
    14             (Land Allocation - $30,000)
    15             (Design and Contingencies - $81,000)
    16         (6)  S.R.0202, Doylestown Bypass, Pa.611 to
    17             Pa.262, 8 bridges, Doylestown and
    18             Buckingham Townships, Bridge Deck
    19             Rehabilitation                              4,000,000
    20             (Base Construction Allocation -
    21             $3,800,000)
    22             (Design and Contingencies - $200,000)
    23         (7)  S.R.0001, Langhorne Bypass, Pa.213 to
    24             Pa. Turnpike, 5 bridges, Bensalem and
    25             Middletown Townships, Bridge Deck
    26             Rehabilitation                             10,000,000
    27             (Base Construction Allocation -
    28             $9,500,000)
    29             (Design and Contingencies - $500,000)
    30         (8)  S.R.0152, State Road Bridge over
    19920S1746B2236                 - 27 -

     1             SEPTA, West Rockhill Township, Bridge
     2             Deck Rehabilitation                           500,000
     3             (Base Construction Allocation -
     4             $475,000)
     5             (Design and Contingencies - $25,000)
     6         (9)  S.R.0212, Richlandtown Road Bridge
     7             over Tohickon Creek, Quakertown, Bridge
     8             Deck Rehabilitation                           510,000
     9             (Base Construction Allocation -
    10             $485,000)
    11             (Design and Contingencies - $25,000)
    12         (10)  S.R.0611, Easton Road Bridge over
    13             Deep Run, Bedminister Township, Bridge
    14             Deck Rehabilitation                           500,000
    15             (Base Construction Allocation -
    16             $475,000)
    17             (Design and Contingencies - $25,000)
    18         (11)  S.R.0611, Easton Road Bridge over
    19             Tohickon Creek, Bedminister Township,
    20             Bridge Deck Rehabilitation                    700,000
    21             (Base Construction Allocation -
    22             $665,000)
    23             (Design and Contingencies - $35,000)
    24         (12)  S.R.0611, Easton and Creamery Roads,
    25             Tinicum Township, Bridge Deck
    26             Rehabilitation                                350,000
    27             (Base Construction Allocation -
    28             $332,000)
    29             (Design and Contingencies - $18,000)
    30         (13)  S.R.2006, Newportville-Falls Road
    19920S1746B2236                 - 28 -

     1             Bridge over Neshaminy Creek, Bensalem
     2             Township, Bridge Deck Rehabilitation        1,400,000
     3             (Base Construction Allocation -
     4             $1,330,000)
     5             (Design and Contingencies - $70,000)
     6         (14)  S.R.2020, Bristol/Tyburn Road Bridge
     7             over Amtrak, Falls Township, Bridge
     8             Deck Rehabilitation                         1,100,000
     9             (Base Construction Allocation -
    10             $1,045,000)
    11             (Design and Contingencies - $55,000)
    12         (15)  S.R.2020, Tyburn Road at Warner
    13             Company Road, Falls Township, Bridge
    14             Deck Rehabilitation                           600,000
    15             (Base Construction Allocation -
    16             $570,000)
    17             (Design and Contingencies - $30,000)
    18         (16)  S.R.2020, Tyburn Road over Conrail
    19             Spur, Falls Township, Bridge Deck
    20             Rehabilitation                                650,000
    21             (Base Construction Allocation -
    22             $618,000)
    23             (Design and Contingencies - $32,000)
    24         (17)  S.R.2020, Tyburn Road at Pennsylvania
    25             Avenue, Falls Township, Bridge Deck
    26             Rehabilitation                                450,000
    27             (Base Construction Allocation -
    28             $428,000)
    29             (Design and Contingencies - $22,000)
    30         (18)  S.R.0513, Hulmeville Road, Bridge
    19920S1746B2236                 - 29 -

     1             over a Tributary of Poquessing Creek,
     2             Bensalem Township, Bridge Replacement         400,000
     3             (Base Construction Allocation -
     4             $315,000)
     5             (Land Allocation - $35,000)
     6             (Design and Contingencies - $50,000)
     7         (19)  Schofield Covered Bridge, Tyler State
     8             Park, Covered Bridge Trail over
     9             Nesmaminy Creek, Newton Township and
    10             Northampton Township, Bridge
    11             Replacement                                   750,000
    12             (Base Construction Allocation -
    13             $600,000)
    14             (Land Allocation - $25,000)
    15             (Design and Contingencies - $125,000)
    16         (20)  S.R.2002, Radcliffe Street over Adams
    17             Hollow Creek, Bristol Borough, Bridge
    18             Replacement                                   335,000
    19             (Base Construction Allocation -
    20             $250,000)
    21             (Land Allocation - $50,000)
    22             (Design and Contingencies - $35,000)
    23  Section 14.  Butler County.
    24     (a)  Local Bridges
    25         (1)  City of Butler, West New Castle Street
    26             Bridge over Sullivan Run, Bridge
    27             Replacement                                   500,000
    28             (Base Construction Allocation -
    29             $420,000)
    30             (Land Allocation - $20,000)
    19920S1746B2236                 - 30 -

     1             (Design and Contingencies - $60,000)
     2         (2)  City of Butler, T-362, West Penn
     3             Street Bridge over Sullivan Run, Bridge
     4             Replacement                                   450,000
     5             (Base Construction Allocation -
     6             $375,000)
     7             (Land Allocation - $15,000)
     8             (Design and Contingencies - $60,000)
     9         (3)  City of Butler, T-354, Mercer Street
    10             Bridge over Sullivan Run, Bridge
    11             Replacement                                   500,000
    12             (Base Construction Allocation -
    13             $415,000)
    14             (Land Allocation - $25,000)
    15             (Design and Contingencies - $60,000)
    16         (4)  City of Butler, T-319, West Brady
    17             Street Bridge over Sullivan Run, Bridge
    18             Replacement                                   500,000
    19             (Base Construction Allocation -
    20             $420,000)
    21             (Land Allocation - $20,000)
    22             (Design and Contingencies - $60,000)
    23         (5)  Parker Township, T-731, Jones Bridge
    24             over North Branch Bear Creek, Bridge
    25             Replacement                                   585,000
    26             (Base Construction Allocation -
    27             $530,000)
    28             (Land Allocation - $15,000)
    29             (Design and Contingencies - $40,000)
    30         (6)  Adams Township, T-382, Glade Run
    19920S1746B2236                 - 31 -

     1             Bridge over Glade Run, Bridge
     2             Replacement                                   520,000
     3             (Base Construction Allocation -
     4             $470,000)
     5             (Design and Contingencies - $15,000)
     6             (Land Allocation - $35,000)
     7         (7)  Donegal Township, T-830, Rattigan Road
     8             Bridge, Bridge Replacement                    190,000
     9             (Base Construction Allocation -
    10             $190,000)
    11         (8)  Donegal Township, T-830, Buffalo Creek
    12             Bridge, Bridge Replacement                    270,000
    13             (Base Construction Allocation -
    14             $270,000)
    15         (9)  Clearfield Township, T-664, McMillen
    16             Bridge over Little Buffalo Run, Bridge
    17             Replacement                                   420,000
    18             (Base Construction Allocation -
    19             $365,000)
    20             (Land Allocation - $15,000)
    21             (Design and Contingencies - $40,000)
    22         (10)  Winfield Township, T-656, Cornplanter
    23             Road Bridge, Bridge Replacement                 5,000
    24             (Base Construction Allocation - $5,000)
    25         (11)  Butler Township, Saw Mill Run Bridge,
    26             Saw Mill Run Park, Bridge Replacement          84,000
    27             (Base Construction Allocation -
    28             $84,000)
    29         (12)  Adams Township, T-352, Kaufman Run
    30             Bridge over Kaufman Run, Bridge
    19920S1746B2236                 - 32 -

     1             Replacement                                   339,000
     2             (Base Construction Allocation -
     3             $299,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $30,000)
     6         (13)  Penn Township, T-380, Anderson Run
     7             Bridge over Anderson Run, Bridge
     8             Replacement                                   269,000
     9             (Base Construction Allocation -
    10             $226,000)
    11             (Land Allocation - $8,000)
    12             (Design and Contingencies - $35,000)
    13         (14)  Zelienople Borough, Market Street
    14             Bridge over Glade Run, Bridge
    15             Replacement                                   301,000
    16             (Base Construction Allocation -
    17             $258,000)
    18             (Land Allocation - $8,000)
    19             (Design and Contingencies - $35,000)
    20         (15)  City of Butler, West New Castle
    21             Street Bridge over Sullivan Run, Bridge
    22             Replacement                                   500,000
    23             (Base Construction Allocation -
    24             $420,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $60,000)
    27         (16)  Jefferson Township, T-556, Thorn
    28             Creek Bridge over Thorn Creek, Bridge
    29             Replacement                                   251,000
    30             (Base Construction Allocation -
    19920S1746B2236                 - 33 -

     1             $208,000)
     2             (Land Allocation - $8,000)
     3             (Design and Contingencies - $35,000)
     4         (17)  Jefferson Township, T-579, Thorn
     5             Creek Bridge over Thorn Creek, Bridge
     6             Replacement                                   520,000
     7             (Base Construction Allocation -
     8             $470,000)
     9             (Land Allocation - $15,000)
    10             (Design and Contingencies - $35,000)
    11     (b)  State Bridges
    12         (1)  S.R.0528, Evans City Bridge over B&O
    13             Railroad, Forward Township, Bridge
    14             Replacement                                 1,480,000
    15             (Base Construction Allocation -
    16             $1,400,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $60,000)
    19         (2)  S.R.0288 over Connoquenessing Creek,
    20             Zelienople Borough, Bridge Replacement      1,380,000
    21             (Base Construction Allocation -
    22             $1,300,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $60,000)
    25         (3)  S.R.3014, South Evans City Bridge over
    26             Wolfe Creek, Adams Township, Bridge
    27             Replacement                                   570,000
    28             (Base Construction Allocation -
    29             $500,000)
    30             (Land Allocation - $20,000)
    19920S1746B2236                 - 34 -

     1             (Design and Contingencies - $50,000)
     2         (4)  S.R.3017 over Kaufman Run, Adams
     3             Township, Bridge Replacement                  580,000
     4             (Base Construction Allocation -
     5             $500,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $60,000)
     8         (5)  S.R.3001, Lyndora Viaduct over
     9             Connoquenessing Creek, City of Butler,
    10             Bridge Replacement                          5,335,000
    11             (Base Construction Allocation -
    12             $4,850,000)
    13             (Design and Contingencies - $485,000)
    14         (6)  Main Street Viaduct, Route No.8 over
    15             B&LE - B&O Railroads, City of Butler,
    16             Bridge Replacement                         23,000,000
    17             (Base Construction Allocation -
    18             $10,800,000)
    19             Land Allocation - $700,000)
    20             (Design and Contingencies -
    21             $11,500,000)
    22         (7)  S.R.0356, Wayne Street Viaduct over
    23             Connoquenessing Creek, City of Butler,
    24             Bridge Replacement                            902,000
    25             (Base Construction Allocation -
    26             $902,000)
    27         (8)  Main Street Viaduct over B&LE - B&O
    28             Railroads, City of Butler, Bridge
    29             Replacement                                   980,000
    30             (Base Construction Allocation -
    19920S1746B2236                 - 35 -

     1             $980,000)
     2         (9)  S.R.0356, Wayne Street Viaduct over
     3             Connoquenessing Creek, City of Butler,
     4             Bridge Replacement                          5,150,000
     5             (Base Construction Allocation -
     6             $4,800,000)
     7             (Land Allocation - $350,000)
     8         (10)  S.R.1011, Thorne Run Bridge over
     9             Thorne Run, Oakland Township, Bridge
    10             Replacement                                   305,000
    11             (Base Construction Allocation -
    12             $250,000)
    13             (Land Allocation - $25,000)
    14             (Design and Contingencies - $30,000)
    15         (11)  S.R.0108, Wolf Run Bridge over Wolf
    16             Run, Worth Township, Bridge
    17             Replacement                                 1,100,000
    18             (Base Construction Allocation -
    19             $1,100,000)
    20         (12)  S.R.1011, Thorne Run Bridge over
    21             Thorne Run, Oakland Township, Bridge
    22             Replacement                                   305,000
    23             (Base Construction Allocation -
    24             $250,000)
    25             (Land Allocation - $25,000)
    26             (Design and Contingencies - $30,000)
    27  Section 15.  Cambria County
    28     (a)  Local Bridges
    29         (1)  Barr Township, T-496 Dutch Run Bridge,
    30             Bridge Replacement                            115,000
    19920S1746B2236                 - 36 -

     1             (Base Construction Allocation -
     2             $100,000)
     3             (Land Allocation - $5,000)
     4             (Design and Contingencies - $10,000)
     5         (2)  East Taylor Township, T-380 Henchstone
     6             Run Bridge, Bridge Replacement                115,000
     7             (Base Construction Allocation -
     8             $100,000)
     9             (Land Allocation - $5,000)
    10             (Design and Contingencies - $10,000)
    11         (3)  Croyle Township, T-330 Croyle Township
    12             Bridge, Bridge Replacement                    300,000
    13             (Base Construction Allocation -
    14             $300,000)
    15         (4)  Dale Borough, Annie Street Bridge,
    16             Bridge Replacement                            500,000
    17             (Base Construction Allocation -
    18             $500,000)
    19         (5)  Spangler Borough, South 15th Street
    20             Bridge, Bridge Replacement                    100,000
    21             (Base Construction Allocation -
    22             $100,000)
    23         (6)  Spangler Borough, South 7th Street
    24             Bridge, Bridge Replacement                    100,000
    25             (Base Construction Allocation -
    26             $100,000)
    27         (7)  Carrolltown Borough, CB-1 Carrolltown
    28             Treatment Plant Access Road Bridge,
    29             Bridge Replacement                            939,000
    30             (Base Construction Allocation -
    19920S1746B2236                 - 37 -

     1             $939,000)
     2         (8)  Loraine Borough, Highland Drive
     3             Bridge, Bridge Replacement                     50,000
     4             (Base Construction Allocation -
     5             $50,000)
     6         (9)  Portage Borough, Gellespie Avenue,
     7             Trout Run Bridge No.1, Bridge
     8             Replacement                                   422,000
     9             (Base Construction Allocation -
    10             $422,000)
    11         (10)  Spangler Borough, South 15th Street
    12             Bridge over Fox Run, Bridge
    13             Replacement                                   250,000
    14             (Base Construction Allocation -
    15             $250,000)
    16         (11)  Portage Township, Conemaugh Avenue,
    17             Trout Run Bridge No.3, Bridge
    18             Replacement                                   394,000
    19             (Base Construction Allocation -
    20             $394,000)
    21         (12)  Portage Borough, Sonman Avenue, Trout
    22             Run Bridge No.4, Bridge Replacement           661,000
    23             (Base Construction Allocation -
    24             $661,000)
    25         (13)  Portage Borough, Jefferson Avenue,
    26             Trout Run Bridge No.2, Bridge
    27             Replacement                                   469,000
    28             (Base Construction Allocation -
    29             $469,000)
    30         (14)  Susquehanna Township, T-559, Allport
    19920S1746B2236                 - 38 -

     1             Bridge No.5, Bridge Replacement               500,000
     2             (Base Construction Allocation -
     3             $500,000)
     4         (15)  Barr Township, T-548, North Spangler
     5             Bridge No.4, Bridge Replacement               700,000
     6             (Base Construction Allocation -
     7             $700,000)
     8         (16)  Hastings Borough, Third Avenue Bridge
     9             No.6, Bridge Replacement                      500,000
    10             (Base Construction Allocation -
    11             $500,000)
    12         (17)  Allegheny Township, T-452, Wildwood
    13             Bridge, Bridge Replacement                    500,000
    14             (Base Construction Allocation -
    15             $500,000)
    16         (18)  Dean Township, T-521, Dean Bridge
    17             No.11, Bridge Replacement                     500,000
    18             (Base Construction Allocation -
    19             $500,000)
    20         (19)  Clearfield Township, T-517, Chest
    21             Creek Bridge No.7, Bridge Replacement         500,000
    22             (Base Construction Allocation -
    23             $500,000)
    24         (20)  Blacklick Township, T-549, Red Mill
    25             Bridge No.1, Bridge Replacement               500,000
    26             (Base Construction Allocation -
    27             $500,000)
    28         (21)  White Township, T-561, Van Orner
    29             Bridge No.10, Bridge Replacement              500,000
    30             (Base Construction Allocation -
    19920S1746B2236                 - 39 -

     1             $500,000)
     2     (b)  State Bridges
     3         (1)  S.R.0053, North Armsbury Bridge,
     4             Gallitzin Township, Bridge Replacement      1,018,000
     5             (Base Construction Allocation -
     6             $1,018,000)
     7         (2)  S.R.0053, South Van Ormer Bridge,
     8             Reade Township, Bridge Replacement            570,000
     9             (Base Construction Allocation -
    10             $570,000)
    11         (3)  S.R.0053, Brady Run Bridge, Gallitzin
    12             Township, Bridge Replacement                2,635,000
    13             (Base Construction Allocation -
    14             $2,635,000)
    15         (4)  S.R.0271, Maple Street Bridge, City of
    16             Johnstown, Bridge Replacement               2,250,000
    17             (Base Construction Allocation -
    18             $2,250,000)
    19         (5)  S.R.0164, Sonman Run Bridge, Portage
    20             Borough, Bridge Replacement                   550,000
    21             (Base Construction Allocation -
    22             $550,000)
    23         (6)  S.R.0240 and S.R.0219, Junction
    24             Bridge, Susquehanna Township, Bridge
    25             Replacement                                 1,170,000
    26             (Base Construction Allocation -
    27             $1,170,000)
    28         (7)  S.R.0253, Houtzdale Road Bridge, Reade
    29             Township, Bridge Replacement                  540,000
    30             (Base Construction Allocation -
    19920S1746B2236                 - 40 -

     1             $540,000)
     2         (8)  S.R.1001, Loretta Road Bridge,
     3             Allegheny Township, Bridge Replacement        620,000
     4             (Base Construction Allocation -
     5             $620,000)
     6         (9)  S.R.2014, Bridge over North Branch of
     7             Little Conemaugh Run, Munster Township,
     8             Bridge Replacement                            555,000
     9             (Base Construction Allocation -
    10             $555,000)
    11         (10)  S.R.4021, Brubakers Run Bridge,
    12             Hastings Borough, Bridge Replacement          515,000
    13             (Base Construction Allocation -
    14             $515,000)
    15         (11)  S.R.0271, Maple Street Bridge over
    16             Little Conemaugh River and Conrail,
    17             City of Johnstown, Bridge
    18             Rehabilitation                              2,225,000
    19             (Base Construction Allocation -
    20             $2,000,000)
    21             (Land Allocation - $25,000)
    22             (Design and Contingencies - $200,000)
    23  Section 16.  Cameron County.
    24     (a)  Local Bridges (Reserved)
    25     (b)  State Bridges
    26         (1)  S.R.0555, Hicks Run Bridge over Hicks
    27             Run, Gibson Township, Bridge
    28             Replacement                                 1,050,000
    29             (Base Construction Allocation -
    30             $800,000)
    19920S1746B2236                 - 41 -

     1             (Land Allocation - $100,000)
     2             (Design and Contingencies - $150,000)
     3         (2)  S.R.0555, Driftwood Branch, Bridge
     4             over Simmamahoning Creek, Driftwood
     5             Borough, Bridge Replacement                 2,050,000
     6             (Base Construction Allocation -
     7             $1,750,000)
     8             (Land Allocation - $150,000)
     9             (Design and Contingencies - $150,000)
    10  Section 17.  Carbon County.
    11     (a)  Local Bridges
    12         (1)  Penn Forest Township, T-516, County
    13             Bridge No.12 over Mud Run, Bridge
    14             Replacement                                   240,000
    15             (Base Construction Allocation -
    16             $200,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $30,000)
    19         (2)  East Penn Township, T-354 over Lizard
    20             Creek County Bridge No.6, Bridge
    21             Replacement                                   445,000
    22             (Base Construction Allocation -
    23             $390,000)
    24             (Land Allocation - $15,000)
    25             (Design and Contingencies - $40,000)
    26         (3)  Penn Forest Township, T-519, County
    27             Bridge No.11 over Stoney Creek, Bridge
    28             Replacement                                   180,000
    29             (Base Construction Allocation -
    30             $140,000)
    19920S1746B2236                 - 42 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $30,000)
     3         (4)  Lower Towanensing Township, Princess
     4             Creek Bridge over Princess Creek,
     5             Bridge Replacement                            100,000
     6             (Base Construction Allocation -
     7             $85,000)
     8             (Design and Contingencies - $15,000)
     9         (5)  East Penn Township, T-354, Kittanning
    10             Bridge No.6 over Lizard Creek, Bridge
    11             Replacement                                   445,000
    12             (Base Construction Allocation -
    13             $390,000)
    14             (Land Allocation - $15,000)
    15             (Design and Contingencies - $40,000)
    16         (6)  Parker Township, Bridge No.4 over
    17             Quakake Creek, Bridge Replacement             132,000
    18             (Base Construction Allocation -
    19             $112,000)
    20             (Design and Contingencies - $20,000)
    21         (7)  Towamensing Township, T-477, County
    22             Bridge No.16 over Pohopoco Creek,
    23             Bridge Replacement                            375,000
    24             (Base Construction Allocation -
    25             $325,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $40,000)
    28         (8)  Penn Forest Township, T-512, County
    29             Bridge No.13 over Mud Run, Bridge
    30             Replacement                                   220,000
    19920S1746B2236                 - 43 -

     1             (Base Construction Allocation -
     2             $180,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $30,000)
     5         (9)  Towansing Township, T-447, County
     6             Bridge No.16 Big Creek Bridge over
     7             Pohopoco Creek, Bridge Replacement            425,000
     8             (Base Construction Allocation -
     9             $375,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $40,000)
    12     (b)  State Bridges
    13         (1)  S.R.0534 over Hickory Run, Kidder
    14             Township, Bridge Replacement                  202,000
    15             (Base Construction Allocation -
    16             $144,000)
    17             (Land Allocation - $29,000)
    18             (Design and Contingencies - $29,000)
    19         (2)  S.R.0534 over I-80, East Side Borough,
    20             Bridge Replacement                            508,000
    21             (Base Construction Allocation -
    22             $461,000)
    23             (Design and Contingencies - $47,000)
    24  Section 18.  Centre County.
    25     (a)  Local Bridges
    26         (1)  Port Matilda Borough, Pedestrian
    27             Bridge in Port Matilda Community Park
    28             over Pa. Route No.220, Bridge
    29             Replacement                                   165,000
    30             (Base Construction Allocation -
    19920S1746B2236                 - 44 -

     1             $135,000)
     2             (Design and Contingencies - $30,000
     3     (b)  State Bridges
     4         (1)  S.R.2008, Penns Creek Bridge over
     5             Penns Creek, Gregg Township, Bridge
     6             Replacement                                 1,600,000
     7             (Base Construction Allocation -
     8             $1,250,000)
     9             (Land Allocation - $150,000)
    10             (Design and Contingencies - $200,000)
    11         (2)  S.R.3034, One Mile Run Bridge over One
    12             Mile Run, Rush Township, Bridge
    13             Replacement                                   500,000
    14             (Base Construction Allocation -
    15             $300,000)
    16             (Land Allocation - $100,000)
    17             (Design and Contingencies - $100,000)
    18         (3)  S.R.4004, McCormick Run Bridge over
    19             McCormick Run, Union Township, Bridge
    20             Replacement                                   500,000
    21             (Base Construction Allocation -
    22             $300,000)
    23             (Land Allocation - $100,000)
    24             (Design and Contingencies - $100,000)
    25         (4)  S.R.0970, Moshannon Creek Bridge over
    26             Moshannon Creek, Snow Shoe Township,
    27             Bridge Replacement                          1,600,000
    28             (Base Construction Allocation -
    29             $1,250,000)
    30             (Land Allocation - $150,000)
    19920S1746B2236                 - 45 -

     1             (Design and Contingencies - $200,000)
     2  Section 19.  Chester County.
     3     (a)  Local Bridges
     4         (1)  West Goshen Township, South Bolmar
     5             Street Bridge over SEPTA, Bridge
     6             Replacement                                   380,000
     7             (Base Construction Allocation -
     8             $300,000)
     9             (Land Allocation - $50,000)
    10             (Design and Contingencies - $30,000)
    11     (b)  State Bridges
    12         (1)  S.R.0113, Uwchlan Avenue Bridge over
    13             U.S.30 Bypass, East Caln Township,
    14             Bridge Deck Rehabilitation                    400,000
    15             (Base Construction Allocation -
    16             $380,000)
    17             (Design and Contingencies - $20,000)
    18         (2)  S.R.3069, Grove Road over Broad Run,
    19             West Whiteland Township, Bridge
    20             Replacement                                   380,000
    21             (Base Construction Allocation -
    22             $300,000)
    23             (Land Allocation - $50,000)
    24             (Design and Contingencies - $30,000)
    25  Section 20.  Clarion County.
    26     (a)  Local Bridges (Reserved)
    27     (b)  State Bridges
    28         (1)  S.R.0066, Limestone Railroad Overpass
    29             over Penn Central Railroad, Limestone
    30             Township, Bridge Replacement                1,110,000
    19920S1746B2236                 - 46 -

     1             (Base Construction Allocation -
     2             $1,000,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $100,000)
     5  Section 21.  Clearfield County.
     6     (a)  Local Bridges
     7         (1)  Graham Township, T-697 over Moravian
     8             Run, Bridge Replacement                       405,000
     9             (Base Construction Allocation -
    10             $360,000)
    11             (Land Allocation - $5,000)
    12             (Design and Contingencies - $40,000)
    13     (b)  State Bridges
    14         (1)  S.R.0322, Anderson Creek Bridge over
    15             Anderson Creek, Union Township, Bridge
    16             Replacement                                 1,500,000
    17             (Base Construction Allocation -
    18             $1,300,000)
    19             (Land Allocation - $100,000)
    20             (Design and Contingencies - $100,000)
    21         (2)  S.R.0219, South Brady Street Bridge
    22             over B&P Railroad and Pentz Run, City
    23             of DuBois, Bridge Replacement               2,050,000
    24             (Base Construction Allocation -
    25             $1,775,000)
    26             (Land Allocation - $100,000)
    27             (Design and Contingencies - $175,000)
    28         (3)  S.R.0053, Beaver Run Bridge over
    29             Beaver Run, Houtzdale Borough, Bridge
    30             Replacement                                   650,000
    19920S1746B2236                 - 47 -

     1             (Base Construction Allocation -
     2             $450,000)
     3             (Land Allocation - $100,000)
     4             (Design and Contingencies - $100,000)
     5         (4)  S.R.0153, Beaver Run Bridge over
     6             Beaver Run, Houtzdale Borough, Bridge
     7             Replacement                                   650,000
     8             (Base Construction Allocation -
     9             $450,000)
    10             (Land Allocation - $100,000)
    11             (Design and Contingencies - $100,000)
    12         (5)  S.R.2007, Goss Run Bridge over Goss
    13             Run, Brisbin Borough, Bridge
    14             Replacement                                   550,000
    15             (Base Construction Allocation -
    16             $350,000)
    17             (Land Allocation - $100,000)
    18             (Design and Contingencies - $100,000)
    19         (6)  S.R.1050, Moose Creek Bridge over
    20             Moose Creek, Clearfield Borough, Bridge
    21             Replacement                                   850,000
    22             (Base Construction Allocation -
    23             $650,000)
    24             (Land Allocation - $100,000)
    25             (Design and Contingencies - $100,000)
    26         (7)  S.R.0255, Mine Cover-In Bridge,
    27             Village of Hollywood, Bridge
    28             Replacement                                 1,025,000
    29             (Base Construction Allocation -
    30             $750,000)
    19920S1746B2236                 - 48 -

     1             (Land Allocation - $100,000)
     2             (Design and Contingencies - $175,000)
     3         (8)  S.R.2029, Roaring Run Bridge over
     4             Roaring Run, Bradford Township, Bridge
     5             Replacement                                   550,000
     6             (Base Construction Allocation -
     7             $350,000)
     8             (Land Allocation - $100,000)
     9             (Design and Contingencies - $100,000)
    10         (9)  S.R.3001, Chest Creek Bridge over
    11             Chest Creek, Mahaffey Borough, Bridge
    12             Replacement                                 1,650,000
    13             (Base Construction Allocation -
    14             $1,300,000)
    15             (Land Allocation - $150,000)
    16             (Design and Contingencies - $200,000)
    17         (10)  S.R.2024, Little Laurel Run Bridge
    18             over Little Laurel Run, Decatur
    19             Township, Bridge Replacement                  650,000
    20             (Base Construction Allocation -
    21             $450,000)
    22             (Land Allocation - $100,000)
    23             (Design and Contingencies - $100,000)
    24         (11)  S.R.3014, Chest Creek Bridge over
    25             Chest Creek, Chest Township, Bridge
    26             Replacement                                   950,000
    27             (Base Construction Allocation -
    28             $750,000)
    29             (Land Allocation - $100,000)
    30             (Design and Contingencies - $100,000)
    19920S1746B2236                 - 49 -

     1         (12)  S.R.4018, Bennetts Branch Bridge over
     2             Bennetts Creek, Huston Township, Bridge
     3             Replacement                                 1,000,000
     4             (Base Construction Allocation -
     5             $800,000)
     6             (Land Allocation - $100,000)
     7             (Design and Contingencies - $100,000)
     8         (13)  S.R.3007, Orrs Run Bridge over Orrs
     9             Run, Knox Township, Bridge Replacement        550,000
    10             (Base Construction Allocation -
    11             $350,000)
    12             (Land Allocation - $100,000)
    13             (Design and Contingencies - $100,000)
    14  Section 22.  Clinton County.
    15     (a)  Local Bridges
    16         (1)  Chapman Township, Old Route 120 at
    17             Young Womens Creek North Bend, Bridge
    18             Replacement                                   960,000
    19             (Base Construction Allocation -
    20             $854,000)
    21             Land Allocation - $10,000)
    22             (Design and Contingencies - $96,000)
    23     (b)  State Bridges
    24         (1)  S.R.0477, Long Run Bridge over Long
    25             Run, Lamar Township, Bridge
    26             Replacement                                   800,000
    27             (Base Construction Allocation -
    28             $600,000)
    29             (Land Allocation - $100,000)
    30             (Design and Contingencies - $100,000)
    19920S1746B2236                 - 50 -

     1         (2)  S.R.0477, Fishing Creek Bridge over
     2             Tributary of Fishing Creek, Greene
     3             Township, Bridge Replacement                  575,000
     4             (Base Construction Allocation -
     5             $375,000)
     6             (Land Allocation - $100,000)
     7             (Design and Contingencies - $100,000)
     8         (3)  S.R.1016, Pine Creek Bridge over Pine
     9             Creek, Pine Creek Township, Bridge
    10             Replacement                                 3,000,000
    11             (Base Construction Allocation -
    12             $2,700,000)
    13             (Land Allocation - $150,000)
    14             (Design and Contingencies - $150,000)
    15         (4)  S.R.2009, Fishing Creek Bridge over
    16             Fishing Creek, Logan Township, Bridge
    17             Replacement                                   650,000
    18             (Base Construction Allocation -
    19             $450,000)
    20             (Land Allocation - $100,000)
    21             (Design and Contingencies - $100,000)
    22         (5)  S.R.2022, Bitner Run Bridge over
    23             Bitner Run, Beech Creek Township,
    24             Bridge Replacement                            650,000
    25             (Base Construction Allocation -
    26             $450,000)
    27             (Land Allocation - $100,000)
    28             (Design and Contingencies - $100,000)
    29         (6)  S.R.2002, Cherry Run Bridge over
    30             Cherry Run, Porter & Logan Townships,
    19920S1746B2236                 - 51 -

     1             Bridge Replacement                            775,000
     2             (Base Construction Allocation -
     3             $575,000)
     4             (Land Allocation - $100,000)
     5             (Design and Contingencies - $100,000)
     6         (7)  S.R.2008, Long Run Bridge over Long
     7             Run, Lamar Township, Bridge
     8             Replacement                                   600,000
     9             (Base Construction Allocation -
    10             $400,000)
    11             (Land Allocation - $100,000)
    12             (Design and Contingencies - $100,000)
    13         (8)  S.R.2016, Fishing Creek Bridge over
    14             Fishing Creek, Mill Hall Borough,
    15             Bridge Replacement                          1,600,000
    16             (Base Construction Allocation -
    17             $1,250,000)
    18             (Land Allocation - $150,000)
    19             (Design and Contingencies - $200,000)
    20  Section 23.  Columbia County.
    21     (a)  Local Bridges
    22         (1) Beaver Township, T-367, Bridge over
    23             Catawissa Creek, Bridge Replacement         1,153,000
    24             (Base Construction Allocation -
    25             $980,000)
    26             (Land Allocation - $51,000)
    27             (Design and Contingencies - $122,000)
    28         (2)  Main Township, T-468, Columbia County
    29             Bridge No.42, Bridge over Catawissa
    30             Creek, Bridge Replacement                   1,357,000
    19920S1746B2236                 - 52 -

     1             (Base Construction Allocation -
     2             $1,086,000)
     3             (Land Allocation - $68,000)
     4             (Design and Contingencies - $203,000)
     5         (3)  Stillwater Borough, Columbia County
     6             Bridge No.136 over Raven Creek, Bridge
     7             Replacement                                   305,000
     8             (Base Construction Allocation -
     9             $252,000)
    10             (Land Allocation - $21,000)
    11             (Design and Contingencies - $32,000)
    12         (4)  Main Township, T-413, Columbia County
    13             Bridge No.44 over Catawissa Creek,
    14             Bridge Replacement                            990,000
    15             (Base Construction Allocation -
    16             $825,000)
    17             (Land Allocation - $53,000)
    18             (Design and Contingencies - $112,000)
    19         (5)  Mifflin Township, T-678, Columbia
    20             County Bridge No.51 over Scotch Run,
    21             Bridge Replacement                            233,000
    22             (Base Construction Allocation -
    23             $189,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $24,000)
    26         (6)  Pine Township, T-621, Columbia County
    27             Bridge No.85 over West Branch Run,
    28             Bridge Replacement                            564,000
    29             (Base Construction Allocation -
    30             $287,000)
    19920S1746B2236                 - 53 -

     1             (Land Allocation - $240,000)
     2             (Design and Contingencies - $37,000)
     3         (7)  Greenwood Township, T-536, Columbia
     4             County Bridge No.89 over Little Fishing
     5             Creek, Bridge Replacement                     411,000
     6             (Base Construction Allocation -
     7             $343,000)
     8             (Land Allocation - $25,000)
     9             (Design and Contingencies - $43,000)
    10         (8)  Hemlock Township, T-360, Columbia
    11             County Bridge No.67 over Little Fishing
    12             Creek, Bridge Replacement                     620,000
    13             (Base Construction Allocation -
    14             $525,000)
    15             (Land Allocation - $21,000)
    16             (Design and Contingencies - $74,000)
    17         (9)  Mifflin Township, T-415, Columbia
    18             County Bridge No.53 over Scotch Run,
    19             Bridge Replacement                            265,000
    20             (Base Construction Allocation -
    21             $217,000)
    22             (Land Allocation - $20,000)
    23             (Design and Contingencies - $28,000)
    24         (10)  Orangeville Borough, Columbia County
    25             Bridge No.118 over Conner Race, Bridge
    26             Replacement                                   440,000
    27             (Base Construction Allocation -
    28             $362,000)
    29             (Land Allocation - $26,000)
    30             (Design and Contingencies - $52,000)
    19920S1746B2236                 - 54 -

     1         (11)  Cleveland Township, T-317, Columbia
     2             County Bridge No.29 over Musser Run,
     3             Bridge Replacement                            223,000
     4             (Base Construction Allocation -
     5             $175,000)
     6             (Land Allocation - $25,000)
     7             (Design and Contingencies - $23,000)
     8         (12)  North Centre Township, T-503,
     9             Columbia County Bridge No.169 over Bear
    10             Creek, Bridge Replacement                     274,000
    11             (Base Construction Allocation -
    12             $224,000)
    13             (Land Allocation - $21,000)
    14             (Design and Contingencies - $29,000)
    15         (13)  North Centre Township, T-481,
    16             Columbia County Bridge No.168 over Bear
    17             Creek, Bridge Replacement                     270,000
    18             (Base Construction Allocation -
    19             $210,000)
    20             (Land Allocation - $32,000)
    21             (Design and Contingencies - $28,000)
    22         (14)  Sugarloaf Township and Main Township,
    23             T-468, Bridge over Catawissa Creek,
    24             Bridge Replacement                          1,357,000
    25             (Base Construction Allocation -
    26             $1,086,000)
    27             (Land Allocation - $68,000)
    28             (Design and Contingencies - $203,000)
    29     (b)  State Bridges
    30         (1)  S.R.4001, Segment 0010 Offset 0349
    19920S1746B2236                 - 55 -

     1             over North Shore Road, SEDA-COG, Bridge
     2             Replacement                                   857,000
     3             (Base Construction Allocation -
     4             $686,000)
     5             (Land Allocation - $43,000)
     6             (Design and Contingencies - $128,000)
     7         (2)  S.R.1021, Segment 0010 Offset 0499
     8             over Little Bear Creek, Bridge
     9             Replacement                                   505,000
    10             (Base Construction Allocation -
    11             $380,000)
    12             (Land Allocation - $50,000)
    13             (Design and Contingencies - $75,000)
    14  Section 24.  Crawford County.
    15     (a)  Local Bridges
    16         (1)  Oil Creek Township, T-928, Duncan
    17             Road, Bridge over Pine Creek, Bridge
    18             Replacement                                   570,000
    19             (Base Construction Allocation -
    20             $500,000)
    21             (Land Allocation - $20,000)
    22             (Design and Contingencies - $50,000)
    23         (2)  East Fairfield Township, T-399,
    24             Griffen Road, Bridge over Little Sugar
    25             Creek, Bridge Rehabilitation                   55,000
    26             (Base Construction Allocation -
    27             $50,000)
    28             (Design and Contingencies - $5,000)
    29         (3)  Woodcock Township, T-652, Leimbach
    30             Road, Bridge over Gravel Run, Bridge
    19920S1746B2236                 - 56 -

     1             Replacement                                   570,000
     2             (Base Construction Allocation -
     3             $500,000)
     4             (Land Allocation - $20,000)
     5             (Design and Contingencies - $50,000)
     6     (b)  State Bridges
     7         (1)  S.R.1002, Venango/Railroad Bridge over
     8             Conrail Railroad, Cambridge Township,
     9             Bridge Replacement                            880,000
    10             (Base Construction Allocation -
    11             $800,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $60,000)
    14         (2)  S.R.2029, Hydetown/Indian Run Bridge
    15             over Indian Run, Hydetown Borough,
    16             Bridge Replacement                            260,000
    17             (Base Construction Allocation -
    18             $190,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $50,000)
    21         (3)  S.R.1007, Bidley Corners over Federal
    22             Run, Athens Township, Bridge
    23             Replacement                                   320,000
    24             (Base Construction Allocation -
    25             $272,000)
    26             (Land Allocation - $16,000)
    27             (Design and Contingencies - $32,000)
    28         (4)  S.R.1024 on Lake Road over Oil Creek,
    29             BMS 20102400100354, Bloomfield
    30             Township, Bridge Replacement                  340,000
    19920S1746B2236                 - 57 -

     1             (Base Construction Allocation -
     2             $289,000)
     3             (Land Allocation - $17,000)
     4             (Design and Contingencies - $34,000)
     5         (5)  S.R.4011 on Grange Road over Cussewago
     6             Creek, Cussewago Township, Bridge
     7             Replacement                                   300,000
     8             (Base Construction Allocation -
     9             $255,000)
    10             (Land Allocation - $15,000)
    11             (Design and Contingencies - $30,000)
    12         (6)  S.R.1033, Teepleville over Mackey Run
    13             Richmond Township, Bridge Replacement         280,000
    14             (Base Construction Allocation -
    15             $238,000)
    16             (Land Allocation - $14,000)
    17             (Design and Contingencies - $28,000)
    18         (7)  S.R.0089 on Church Run Road over Dolly
    19             Run, Rome Township, Bridge Replacement        350,000
    20             (Base Construction Allocation -
    21             $297,000)
    22             (Land Allocation - $18,000)
    23             (Design and Contingencies - $35,000)
    24         (8)  S.R.4010 on Springboro Road over Carr
    25             Run, Spring Township, Bridge
    26             Replacement                                   375,000
    27             (Base Construction Allocation -
    28             $318,000)
    29             (Land Allocation - $19,000)
    30             (Design and Contingencies - $38,000)
    19920S1746B2236                 - 58 -

     1         (9)  S.R.0618 over Tributary of Inlet Run,
     2             Summit Township, Bridge Replacement           270,000
     3             (Base Construction Allocation -
     4             $230,000)
     5             (Land Allocation - $13,000)
     6             (Design and Contingencies - $27,000)
     7         (10)  S.R.0006 over Conneaut Creek, Vernon
     8             Township, Bridge Replacement                  420,000
     9             (Base Construction Allocation -
    10             $360,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $40,000)
    13  Section 25.  Cumberland County.
    14     (a)  Local Bridges
    15         (1)  Upper Allen Township, Gettysburg Pike
    16             Bridge, South of Lisburn Road, Bridge
    17             Replacement                                   135,000
    18             (Base Construction Allocation -
    19             $100,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $25,000)
    22         (2)  Mechanicsburg Borough, Mulberry Drive
    23             Bridge, Bridge Replacement                    135,000
    24             (Base Construction Allocation -
    25             $100,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $25,000)
    28         (3)  Mechanicsburg Borough, Church Road at
    29             Mulberry over Trindle Springs, Bridge
    30             Replacement                                   135,000
    19920S1746B2236                 - 59 -

     1             (Base Construction Allocation -
     2             $100,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $25,000)
     5         (4)  Lower Allen Township, Spangler Road
     6             Bridge over Conrail, Bridge
     7             Replacement                                   825,000
     8             (Base Construction Allocation -
     9             $675,000)
    10             (Land Allocation - $25,000)
    11             (Design and Contingencies - $125,000)
    12         (5)  Southampton Township, T-307,
    13             Fogelsonger Road Bridge over Burd Run,
    14             Bridge Replacement                            380,000
    15             (Base Construction Allocation -
    16             $300,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $60,000)
    19         (6)  Southampton Township, T-314, Witmer
    20             Road Bridge over Yellow Breeches Creek,
    21             Bridge Replacement                            140,000
    22             (Base Construction Allocation -
    23             $90,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $40,000)
    26         (7)  Southampton Township, T-319, Gutshall
    27             Road Bridge over Yellow Breeches Creek,
    28             Bridge Replacement                            135,000
    29             (Base Construction Allocation -
    30             $90,000)
    19920S1746B2236                 - 60 -

     1             (Land Allocation - $5,000)
     2             (Design and Contingencies - $40,000)
     3     (b)  State Bridges
     4         (1)  S.R.4021, Bloserville Road over
     5             Conodoquinet Creek, Upper Frankford
     6             Township, Bridge Replacement                  821,000
     7             (Base Construction Allocation -
     8             $732,000)
     9             (Land Allocation - $26,000)
    10             (Design and Contingencies - $63,000)
    11         (2)  S.R.0011 and 0015, 3 bridges over the
    12             Harrisburg Expressway, Conrail and
    13             Gettysburg Road, Camp Hill Borough,
    14             East Pennsboro and Lower Allen
    15             Townships, Bridge Rehabilitation            6,690,000
    16             (Base Construction Allocation -
    17             $5,600,000)
    18             (Land Allocation - $250,000)
    19             (Design and Contingencies - $840,000)
    20  Section 26.  Dauphin County.
    21     (a)  Local Bridges
    22         (1)  Halifax Township, T-563, County Bridge
    23             No.10, Ridge Road over Armstrong Creek,
    24             Bridge Replacement                            197,000
    25             (Base Construction Allocation -
    26             $170,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $17,000)
    29         (2)  Jefferson Township, T-551, County
    30             Bridge No.13, Back Road over South Fork
    19920S1746B2236                 - 61 -

     1             of Powells Creek, Bridge Replacement          305,000
     2             (Base Construction Allocation -
     3             $235,000)
     4             (Land Allocation - $10,0000)
     5             (Design and Contingencies - $60,000)
     6         (3)  Middle Paxton Township, T-304, County
     7             Bridge No.23, Red Hill Road over Clarks
     8             Creek, Bridge Replacement                     300,000
     9             (Base Construction Allocation -
    10             $250,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $40,000)
    13         (4)  Middle Paxton Township, T-686, County
    14             Bridge No.22, Singer Lane over Stoney
    15             Creek, Bridge Replacement                     449,000
    16             (Base Construction Allocation -
    17             $373,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $66,000)
    20         (5)  Reed Township, T-547, County Bridge
    21             No.28, Shoop Farm Bridge over Powells
    22             Creek, Bridge Replacement                     451,000
    23             (Base Construction Allocation -
    24             $375,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $66,000)
    27         (6)  Wiconisco Township, T-707, Arch Street
    28             Bridge over Wiconisco Creek, Bridge
    29             Replacement                                   339,000
    30             (Base Construction Allocation -
    19920S1746B2236                 - 62 -

     1             $294,000)
     2             (Land Allocation - $5,000)
     3             (Design and Contingencies - $40,000)
     4         (7)  East Hanover Township, T-001, Bridge
     5             No.1 on Jonestown Road over Tributary
     6             to Swatara Creek, Bridge
     7             Rehabilitation                                150,000
     8             (Base Construction Allocation -
     9             $35,000)
    10             (Land Allocation - $5,000)
    11             (Design and Contingencies - $110,000)
    12         (8)  East Hanover Township, T-467, Bridge
    13             No.2 on Carlson Road over Manada Creek,
    14             Bridge Replacement                            422,000
    15             (Base Construction Allocation -
    16             $340,000)
    17             (Land Allocation - $12,000)
    18             (Design and Contingencies - $70,000)
    19         (9)  East Hanover Township, T-471, Bridge
    20             No.3 on North Meadow Lane over Manada
    21             Creek, Bridge Replacement                     315,000
    22             (Base Construction Allocation -
    23             $60,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $245,000)
    26         (10)  East Hanover Township, T-001, Bridge
    27             No.4 on Jonestown Road over Manada
    28             Creek, Bridge Rehabilitation                  285,000
    29             (Base Construction Allocation -
    30             $235,000)
    19920S1746B2236                 - 63 -

     1             (Land Allocation - $5,000)
     2             (Design and Contingencies - $45,000)
     3         (11)  Derry Township, T-504, Park Boulevard
     4             Bridge over Spring Creek, Bridge
     5             Replacement                                   690,000
     6             (Base Construction Allocation -
     7             $550,000)
     8             (Land Allocation - $40,000)
     9             (Design and Contingencies - $100,000)
    10     (b)  State Bridges
    11         (1)  S.R.0325, Clarks Valley Road Bridge
    12             over Clarks Creek, Middle Paxton
    13             Township, Bridge Replacement                1,050,000
    14             (Base Construction Allocation -
    15             $900,000)
    16             (Land Allocation - $25,000)
    17             (Design and Contingencies - $125,000)
    18         (2)  S.R.0039, Hershey Road over Swatara
    19             Creek, South Hanover Township, Bridge
    20             Rehabilitation                                476,000
    21             (Base Construction Allocation -
    22             $406,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $60,000)
    25         (3)  S.R.3018, Herr Street over Paxton
    26             Creek, Harrisburg City, Bridge
    27             Replacement                                   915,000
    28             (Base Construction Allocation -
    29             $800,000)
    30             (Land Allocation - $25,000)
    19920S1746B2236                 - 64 -

     1             (Design and Contingencies - $90,000)
     2         (4)  S.R.2026, Green Hill Road, Bridge over
     3             Tributary to Beaver Creek, West Hanover
     4             Township, Bridge Replacement                   60,000
     5             (Base Construction Allocation -
     6             $54,000)
     7             (Design and Contingencies - $6,000)
     8  Section 27.  Delaware County.
     9     (a)  Local Bridges (Reserved)
    10     (b)  State Bridges
    11         (1)  S.R.0100, Creek Road Bridge over
    12             Harvey's Run, Birmingham Township,
    13             Bridge Rehabilitation                         285,000
    14             (Base Construction Allocation -
    15             $200,000)
    16             (Land Allocation - $50,000)
    17             (Design and Contingencies - $35,000)
    18         (2)  S.R.1018, Ardmore Avenue Bridge over
    19             SEPTA, Haverford Township, Bridge
    20             Replacement                                   875,000
    21             (Base Construction Allocation -
    22             $750,000)
    23             (Land Allocation - $50,000)
    24             (Design and Contingencies - $75,000)
    25         (3)  S.R.0001, Township Line Road over
    26             SEPTA P&W, Upper Darby Township, Bridge
    27             Deck Rehabilitation                           225,000
    28             (Base Construction Allocation -
    29             $214,000)
    30             (Design and Contingencies - $11,000)
    19920S1746B2236                 - 65 -

     1         (4)  S.R.0452, Market Street Bridge over
     2             Amtrak, Lower Chichester Township,
     3             Bridge Replacement                          6,000,000
     4             (Base Construction Allocation -
     5             $5,700,000)
     6             (Design and Contingencies - $300,000)
     7         (5)  S.R.0013, McDade Boulevard, Bridge
     8             over Darby Creek, Darby Borough, Bridge
     9             Replacement                                 1,000,000
    10             (Base Construction Allocation -
    11             $815,000)
    12             (Land Allocation - $100,000)
    13             (Design and Contingencies - $85,000)
    14  Section 28.  Elk County.
    15     (a)  Local Bridges (Reserved)
    16     (b)  State Bridges
    17         (1)  S.R.1004 Crooked Creek Bridge over
    18             Crooked Creek, Jones Township, Bridge
    19             Replacement                                   775,000
    20             (Base Construction Allocation -
    21             $575,000)
    22             (Land Allocation - $100,000)
    23             (Design and Contingencies - $100,000)
    24         (2)  S.R.0219 Rockey Run Bridge over Rockey
    25             Run, Jones Township, Bridge
    26             Replacement                                   975,000
    27             (Base Construction Allocation -
    28             $775,000)
    29             (Land Allocation - $100,000)
    30             (Design and Contingencies - $100,000)
    19920S1746B2236                 - 66 -

     1         (3)  S.R.0219 Gallagher Run Bridge over
     2             Gallagher Run, Ridgway Borough, Bridge
     3             Replacement                                   975,000
     4             (Base Construction Allocation -
     5             $750,000)
     6             (Land Allocation - $100,000)
     7             (Design and Contingencies - $125,000)
     8         (4)  S.R.3002 Irwin Run Bridge over Irwin
     9             Run, Spring Creek Township, Bridge
    10             Replacement                                   600,000
    11             (Base Construction Allocation -
    12             $400,000)
    13             (Land Allocation - $100,000)
    14             (Design and Contingencies - $100,000)
    15         (5)  S.R.3002 Millstone Creek Bridge over
    16             Millstone Creek, Millstone Township,
    17             Bridge Replacement                          1,200,000
    18             (Base Construction Allocation -
    19             $1,000,000)
    20             (Land Allocation - $100,000)
    21             (Design and Contingencies - $100,000)
    22  Section 29.  Erie County.
    23     (a)  Local Bridges
    24         (1)  City of Erie, West 38th Street Bridge,
    25             Bridge Replacement                            312,000
    26             (Base Construction Allocation -
    27             $282,000)
    28             (Design and Contingencies - $30,000)
    29         (2)  City of Erie, West South Street
    30             Viaduct over Bay Front Parkway, Bridge
    19920S1746B2236                 - 67 -

     1             Replacement                                 4,020,000
     2             (Base Construction Allocation -
     3             $3,600,000)
     4             (Land Allocation - $70,000)
     5             (Design and Contingencies - $350,000)
     6         (3)  North East Township, T-780, Bort Road
     7             Bridge over Conrail Railroad, Bridge
     8             Replacement                                   695,000
     9             (Base Construction Allocation -
    10             $604,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $81,000)
    13         (4)  Conneaut Township, T-300 over
    14             Ashtabula Creek, ID No.25-720303004036,
    15             Bridge Replacement                            165,000
    16             (Base Construction Allocation -
    17             $130,000)
    18             (Land Allocation - $5,000)
    19             (Design and Contingencies - $30,000)
    20         (5)  Waterford Township, T-463, Covered
    21             Bridge over LeBeouf Creek, ID No.25-
    22             722004634003, Bridge Replacement              450,000
    23             (Base Construction Allocation -
    24             $380,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $50,000)
    27         (6)  Conneaut Township, T-360 over Conneaut
    28             Creek, ID No.25-720303604035, Bridge
    29             Replacement                                   160,000
    30             (Base Construction Allocation -
    19920S1746B2236                 - 68 -

     1             $125,000)
     2             (Land Allocation - $5,000)
     3             (Design and Contingencies - $30,000)
     4         (7)  McKean Township, T-448, Skinner Road
     5             over Elk Creek, Bridge Replacement            204,000
     6             (Base Construction Allocation -
     7             $164,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $20,000)
    10     (b)  State Bridges
    11         (1)  S.R.3029 on West Road over Branch
    12             Temple Creek, Elk Creek Township,
    13             Bridge Replacement                            251,000
    14             (Base Construction Allocation -
    15             $213,000)
    16             (Land Allocation - $13,000)
    17             (Design and Contingencies - $25,000)
    18         (2)  S.R.3018 on Tannery Road over
    19             Interstate 90, Girard Township, Bridge
    20             Rehabilitation                              1,200,000
    21             (Base Construction Allocation -
    22             $1,020,000)
    23             (Land Allocation - $60,000)
    24             (Design and Contingencies - $120,000)
    25         (3)  S.R.0005 on East Lake Road over Four
    26             Mile Creek, Lawrence Park Township,
    27             Bridge Replacement                            350,000
    28             (Base Construction Allocation -
    29             $297,000)
    30             (Land Allocation - $18,000)
    19920S1746B2236                 - 69 -

     1             (Design and Contingencies - $35,000)
     2         (4)  S.R.3020 on West Road over Lamson Run,
     3             McKean Township, Bridge Rehabilitation        240,000
     4             (Base Construction Allocation -
     5             $205,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $25,000)
     8         (5)  S.R.4013 on Dunn Valley Road over Elk
     9             Creek, BMS 25401300800214, McKean
    10             Township, Bridge Replacement                  320,000
    11             (Base Construction Allocation -
    12             $270,000)
    13             (Land Allocation - $15,000)
    14             (Design and Contingencies - $35,000)
    15         (6)  S.R.3008 on Crane Road over Trout Run,
    16             Washington Township, Bridge
    17             Rehabilitation                                270,000
    18             (Base Construction Allocation -
    19             $229,000)
    20             (Land Allocation - $14,000)
    21             (Design and Contingencies - $27,000)
    22         (7)  S.R.3025 on Conneauttee Valley Road
    23             over Cummings Creek, Washington
    24             Township, Bridge Replacement                  190,000
    25             (Base Construction Allocation -
    26             $160,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $20,000)
    29  Section 30.  Fayette County.
    30     (a)  Local Bridges
    19920S1746B2236                 - 70 -

     1         (1)  North Union Township, Auto Auction
     2             Bridge, Old Route 51, Bridge Removal          117,000
     3             (Base Construction Allocation -
     4             $100,000)
     5             (Land Allocation - $5,000)
     6             (Design and Contingencies - $12,000)
     7         (2)  North Union Township, Old Route 51
     8             Bridge, North of Auto Auction, Bridge
     9             Removal                                       117,000
    10             (Base Construction Allocation -
    11             $100,000)
    12             (Land Allocation - $5,000)
    13             (Design and Contingencies - $12,000)
    14     (b)  State Bridges
    15         (1)  S.R.0166, Friendship Hill Bridge over
    16             Georges Creek, Springhill and Nicholson
    17             Townships, Bridge Replacement                 975,000
    18             (Base Construction Allocation -
    19             $863,000)
    20             (Land Allocation - $30,000)
    21             (Design and Contingencies - $82,000)
    22         (2)  S.R.1037, Pittsburgh Street over Trump
    23             Run, City of Connellsville, Bridge
    24             Replacement                                   650,000
    25             (Base Construction Allocation -
    26             $575,000)
    27             (Land Allocation - $20,000)
    28             (Design and Contingencies - $55,000)
    29         (3)  S.R.1058, Roaring Run Bridge over
    30             Roaring Run, Donegal Township, Bridge
    19920S1746B2236                 - 71 -

     1             Replacement                                   580,000
     2             (Base Construction Allocation -
     3             $490,000)
     4             (Land Allocation - $40,000)
     5             (Design and Contingencies - $50,000)
     6         (4)  S.R.2007, Stony Run Bridge over Stony
     7             Run, Wharton Township, Bridge
     8             Replacement                                   400,000
     9             (Base Construction Allocation -
    10             $335,000)
    11             (Land Allocation - $30,000)
    12             (Design and Contingencies - $35,000)
    13  Section 31.  Forest County.
    14     (a)  Local Bridges
    15         (1)  Tionesta Township, T-316 on Hemlock
    16             Road over Hemlock Creek, Bridge
    17             Replacement                                   110,000
    18             (Base Construction Allocation -
    19             $88,000)
    20             (Land Allocation - $11,000)
    21             (Design and Contingencies - $11,000)
    22     (b)  State Bridges
    23         (1)  S.R.1003, Blue Jay Creek Bridge over
    24             Blue Jay Creek, Howe Township, Bridge
    25             Replacement                                   340,000
    26             (Base Construction Allocation -
    27             $280,000)
    28             (Land Allocation - $25,000)
    29             (Design and Contingencies - $35,000)
    30         (2)  S.R.4005 on Old Traffic Route 62 over
    19920S1746B2236                 - 72 -

     1             Prather Creek, Hickory Township, Bridge
     2             Replacement                                   271,000
     3             (Base Construction Allocation -
     4             $230,000)
     5             (Land Allocation - $14,000)
     6             (Design and Contingencies - $27,000)
     7  Section 32.  Franklin County.
     8     (a)  Local Bridges (Reserved)
     9     (b)  State Bridges
    10         (1)  S.R.0016, Memorial Bridge under
    11             Western Maryland Railroad, Chambersburg
    12             Borough, Overpass Widening                    700,000
    13             (Base Construction Allocation -
    14             $564,000)
    15             (Land Allocation - $68,000)
    16             (Design and Contingencies - $68,000)
    17  Section 33.  Fulton County (Reserved).
    18  Section 34.  Greene County.
    19     (a)  Local Bridges
    20         (1)  Richhill Township, Route 356 Bridge
    21             No.57 over North Fork Creek, Bridge
    22             Replacement                                   450,000
    23             (Base Construction Allocation -
    24             $350,000)
    25             (Land Allocation - $50,000)
    26             (Design and Contingencies - $50,000)
    27         (2)  Springhill Township, Route 345 Bridge
    28             No.68 over Fork Creek, Bridge
    29             Replacement                                   550,000
    30             (Base Construction Allocation -
    19920S1746B2236                 - 73 -

     1             $450,000)
     2             (Land Allocation - $50,000)
     3             (Design and Contingencies - $50,000)
     4         (3)  Perry Township, Route 385 Bridge No.7
     5             over Shannon Run, Bridge Replacement          180,000
     6             (Base Construction Allocation -
     7             $150,000)
     8             (Land Allocation - $15,000)
     9             (Design and Contingencies - $15,000)
    10         (4)  Gilmore Township, Route 379 Bridge
    11             No.53 over Blockhouse Run, Bridge
    12             Replacement                                   180,000
    13             (Base Construction Allocation -
    14             $150,000)
    15             (Land Allocation - $15,000)
    16             (Design and Contingencies - $15,000)
    17         (5)  Perry Township, Route 357 Bridge No.8
    18             over Shannon Run, Bridge Replacement          260,000
    19             (Base Construction Allocation -
    20             $200,000)
    21             (Land Allocation - $30,000)
    22             (Design and Contingencies - $30,000)
    23         (6)  Jackson Township, Route 447 Bridge
    24             No.56 over Job Creek, Bridge
    25             Replacement                                   260,000
    26             (Base Construction Allocation -
    27             $200,000)
    28             (Land Allocation - $30,000)
    29             (Design and Contingencies - $30,000)
    30         (7)  Morgan Township, Route 568 Bridge
    19920S1746B2236                 - 74 -

     1             No.23 over Ruff Creek, Bridge
     2             Replacement                                    12,000
     3             (Base Construction Allocation -
     4             $12,000)
     5         (8)  Cumberland Township, Route 674 Bridge
     6             No.10 over Muddy Run, Bridge
     7             Replacement                                   425,000
     8             (Base Construction Allocation -
     9             $325,000)
    10             (Land Allocation - $50,000)
    11             (Design and Contingencies - $50,000)
    12         (9)  Greene Township, Route 604 Bridge
    13             No.18 over Whiteley Creek, Bridge
    14             Replacement                                    12,000
    15             (Base Construction Allocation -
    16             $12,000)
    17         (10)  Carmichaels Borough, Bridge No.11 Old
    18             Town Street over Muddy Run, Bridge
    19             Construction                                   12,000
    20             (Base Construction Allocation -
    21             $12,000)
    22         (11)  Freeport Township, Route 362 Bridge
    23             No.67 over Fish Creek, Bridge
    24             Replacement                                   450,000
    25             (Base Construction Allocation -
    26             $350,000)
    27             (Land Allocation - $50,000)
    28             (Design and Contingencies - $50,000)
    29         (12)  Center Township, Route 469 Bridge
    30             No.65 over Gringe Run, Bridge
    19920S1746B2236                 - 75 -

     1             Replacement                                   450,000
     2             (Base Construction Allocation -
     3             $350,000)
     4             (Land Allocation - $50,000)
     5             (Design and Contingencies - $50,000)
     6         (13)  Washington Township, Route 546 Bridge
     7             No.24 over Ruff Creek, Bridge
     8             Replacement                                    12,000
     9             (Base Construction Allocation -
    10             $12,000)
    11         (14)  Center Township, Route 487 Bridge
    12             No.42 over Pursley Creek, Bridge
    13             Replacement                                    12,000
    14             (Base Construction Allocation -
    15             $12,000)
    16         (15)  Center Township, Route 424 Bridge
    17             No.60 over South Fork of Ten Mile
    18             Creek, Bridge Replacement                      12,000
    19             (Base Construction Allocation -
    20             $12,000)
    21         (16)  Washington Township, Route 550 Bridge
    22             No.27 over Craynes Run, Bridge
    23             Replacement                                   400,000
    24             (Base Construction Allocation -
    25             $300,000)
    26             (Land Allocation - $50,000)
    27             (Design and Contingencies - $50,000)
    28         (17)  Wayne Township, Route 371 Bridge
    29             No.38 over Hoovers Run, Bridge
    30             Replacement                                    12,000
    19920S1746B2236                 - 76 -

     1             (Base Construction Allocation -
     2             $12,000)
     3         (18)  Center Township, Route 511 Bridge
     4             No.43 over Pursley Creek, Bridge
     5             Replacement                                   425,000
     6             (Base Construction Allocation -
     7             $325,000)
     8             (Land Allocation - $50,000)
     9             (Design and Contingencies - $50,000)
    10         (19)  Center Township, Route 454 Bridge
    11             No.85 over Hargus Creek, Bridge
    12             Replacement                                    12,000
    13             (Base Construction Allocation -
    14             $12,000)
    15         (20)  Richhill Township, Route 346 Bridge
    16             No.78 over Owens Run, Bridge
    17             Replacement                                   425,000
    18             (Base Construction Allocation -
    19             $325,000)
    20             (Land Allocation - $50,000)
    21             (Design and Contingencies - $50,000)
    22         (21)  Wayne Township, Route 490 Bridge
    23             No.37 over Roberts Run, Bridge
    24             Replacement                                   140,000
    25             (Base Construction Allocation -
    26             $100,000)
    27             (Land Allocation - $20,000)
    28             (Design and Contingencies - $20,000)
    29         (22)  Cumberland Township, T-674, County
    30             Bridge No.10, over Muddy Run, Bridge
    19920S1746B2236                 - 77 -

     1             Replacement                                   489,000
     2             (Base Construction Allocation -
     3             $443,000)
     4             (Land Allocation - $5,000)
     5             (Design and Contingencies - $41,000)
     6     (b)  State Bridges
     7         (1)  S.R.0188, County Maintenance Building,
     8             Bridge Replacement                            875,000
     9             (Base Construction Allocation -
    10             $750,000)
    11             (Land Allocation - $50,000)
    12             (Design and Contingencies - $75,000)
    13         (2)  S.R.2016 over Whiteley Creek,
    14             Monongahela Township, Bridge
    15             Replacement                                   550,000
    16             (Base Construction Allocation -
    17             $500,000)
    18             (Design and Contingencies - $50,000)
    19         (3)  S.R.3001 Enslow Fork Bridge, Richhill
    20             Township, Bridge Replacement                  450,000
    21             (Base Construction Allocation -
    22             $400,000)
    23             (Design and Contingencies - $50,000)
    24         (4)  S.R.4033 Swartz Bridge, Washington
    25             Township, Bridge Replacement                  250,000
    26             (Base Construction Allocation -
    27             $200,000)
    28             (Design and Contingencies - $50,000)
    29         (5)  S.R.0018 Ten Mile Creek Bridge No.3,
    30             Bridge Replacement                            550,000
    19920S1746B2236                 - 78 -

     1             (Base Construction Allocation -
     2             $500,000)
     3             (Design and Contingencies - $50,000)
     4         (6)  S.R.0088 Dunkard Creek Bridge,
     5             Dilliner, Bridge Replacement                1,150,000
     6             (Base Construction Allocation -
     7             $1,000,000)
     8             (Land Allocation - $50,000)
     9             (Design and Contingencies - $100,000)
    10         (7)  S.R.0188 Segment 130 Offset 1860 to
    11             Segment 130 Offset 1933, Bells Bridge,
    12             Bridge Replacement                            550,000
    13             (Base Construction Allocation -
    14             $500,000)
    15             (Design and Contingencies - $50,000)
    16         (8)  S.R.0021, Ten Mile Creek Bridge West
    17             over Ten Mile Creek, Center Township,
    18             Bridge Replacement                            194,000
    19             (Base Construction Allocation -
    20             $160,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $24,000)
    23         (9)  S.R.3009, Hoover's Run Bridge over
    24             Hoover's Run, Wayne Township, Bridge
    25             Replacement                                   375,000
    26             (Base Construction Allocation -
    27             $320,000)
    28             (Land Allocation - $20,000)
    29             (Design and Contingencies - $35,000)
    30         (10)  S.R.3013, Bells Run Bridge over Bells
    19920S1746B2236                 - 79 -

     1             Run, Wayne Township, Bridge
     2             Replacement                                   275,000
     3             (Base Construction Allocation -
     4             $225,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $30,000)
     7         (11)  S.R.3013, Bulldog Run Bridge over
     8             Little Run, Wayne Township, Bridge
     9             Replacement                                   280,000
    10             (Base Construction Allocation -
    11             $230,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $30,000)
    14  Section 35.  Huntingdon County.
    15     (a)  Local Bridges
    16         (1)  Clay Township, T-341, Watkins Bridge
    17             over Three Springs Creek, Bridge
    18             Replacement                                   620,000
    19             (Base Construction Allocation -
    20             $496,000)
    21             (Land Allocation - $31,000)
    22             (Design and Contingencies - $93,000)
    23     (b)  State Bridges (Reserved)
    24  Section 36.  Indiana County.
    25     (a)  Local Bridges
    26         (1)  Green Township, T-678, Dixon Run
    27             Bridge over Dixon Run, Bridge
    28             Replacement                                   258,000
    29             (Base Construction Allocation -
    30             $225,000)
    19920S1746B2236                 - 80 -

     1             (Land Allocation - $8,000)
     2             (Design and Contingencies - $25,000)
     3         (2)  Center Township, T-680, Coral Bridge
     4             over Two Lick Creek, Bridge
     5             Replacement                                   600,000
     6             (Base Construction Allocation -
     7             $480,000)
     8             (Land Allocation - $60,000)
     9             (Design and Contingencies - $60,000)
    10         (3)  Plumville Borough, T-840, Plumville
    11             Bridge over Plum Creek, Bridge
    12             Replacement                                   300,000
    13             (Base Construction Allocation -
    14             $240,000)
    15             (Land Allocation - $30,000)
    16             (Design and Contingencies - $30,000)
    17         (4)  Rayne Township, T-611, Bridge over
    18             Pine Run, Bridge Replacement                  250,000
    19             (Base Construction Allocation -
    20             $200,000)
    21             (Land Allocation - $25,000)
    22             (Design and Contingencies - $25,000)
    23         (5)  Grant Township, T-851, Bridge over
    24             East Run, Bridge Replacement                  250,000
    25             (Base Construction Allocation -
    26             $200,000)
    27             (Land Allocation - $25,000)
    28             (Design and Contingencies - $25,000)
    29         (6)  Blairsville Borough, Ranson Road over
    30             Conrail, Bridge Replacement                   550,000
    19920S1746B2236                 - 81 -

     1             (Base Construction Allocation -
     2             $500,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $40,000)
     5         (7)  Blacklick Township, T-460, Arch Bridge
     6             over Aultmans Run, Bridge Replacement         243,000
     7             (Base Construction Allocation -
     8             $200,000)
     9             (Land Allocation - $8,000)
    10             (Design and Contingencies - $35,000)
    11         (8)  Burrell Township, T-660, Blacklick
    12             Creek Bridge over Blacklick Creek,
    13             Bridge Replacement                          1,010,000
    14             (Base Construction Allocation -
    15             $900,000)
    16             (Land Allocation - $30,000)
    17             (Design and Contingencies - $80,000)
    18         (9)  Blacklick Township, T-460, McKee
    19             Bridge over Aultmans Run, Bridge
    20             Replacement                                   288,000
    21             (Base Construction Allocation -
    22             $240,000)
    23             (Land Allocation - $8,000)
    24             (Design and Contingencies - $40,000)
    25         (10)  Blacklick Township, T-660, Aultmans
    26             Run Bridge over Aultmans Run, Bridge
    27             Replacement                                   301,000
    28             (Base Construction Allocation -
    29             $250,000)
    30             (Land Allocation - $8,000)
    19920S1746B2236                 - 82 -

     1             (Design and Contingencies - $43,000)
     2         (11)  Saltsburg Borough, High Street Bridge
     3             over Deep Ravine, Bridge Replacement          600,000
     4             (Base Construction Allocation -
     5             $545,000)
     6             (Land Allocation - $15,000)
     7             (Design and Contingencies - $40,000)
     8         (12)  Clymer Borough, Wilson Street Bridge
     9             over Dixon Run, Bridge Replacement            305,000
    10             (Base Construction Allocation -
    11             $250,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $45,000)
    14         (13)  Creekside Borough, Caneva Street
    15             McKee Bridge over McKee Run, Bridge
    16             Replacement                                   400,000
    17             (Base Construction Allocation -
    18             $352,000)
    19             (Land Allocation - $8,000)
    20             (Design and Contingencies - $40,000)
    21         (14)  Adams Township, T-382, Glade Run
    22             Bridge over Glade Run, Bridge
    23             Replacement                                   520,000
    24             (Base Construction Allocation -
    25             $470,000)
    26             (Land Allocation - $15,000)
    27             (Design and Contingencies - $35,000)
    28         (15)  Armstrong Township, T-414, Thomas
    29             Bridge over Crooked Creek, Bridge
    30             Replacement                                   550,000
    19920S1746B2236                 - 83 -

     1             (Base Construction Allocation -
     2             $465,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $65,000)
     5     (b)  State Bridges
     6         (1)  S.R.3031, Aultmans Run Bridge over
     7             Aultmans Run, Blacklick Township,
     8             Bridge Replacement                            265,000
     9             (Base Construction Allocation -
    10             $220,000)
    11             (Land Allocation - $15,000)
    12             (Design and Contingencies - $30,000)
    13         (2)  S.R.0022, Blairsville East, Burrell
    14             Township, Bridge Replacement                8,910,000
    15             (Base Construction Allocation -
    16             $8,710,000)
    17             (Design and Contingencies - $200,000)
    18         (3)  S.R.0108, Wolfe Run Bridge over Wolfe
    19             Run, Worth Township, Bridge
    20             Replacement                                   131,000
    21             (Base Construction Allocation -
    22             $100,000)
    23             (Land Allocation - $30,000)
    24             (Design and Contingencies - $1,000)
    25         (4)  S.R.0022, Blairsville East, Burrell
    26             Township Bridge Replacement                   200,000
    27             (Design and Contingencies - $200,000)
    28         (5)  S.R.0259, Bolivar Bridge over
    29             Conemaugh River, Parkinson and Bolivar
    30             Boroughs, Bridge Replacement                  550,000
    19920S1746B2236                 - 84 -

     1             (Design and Contingencies - $550,000)
     2         (6)  S.R.3029, Whiskey Run Bridge over
     3             Whiskey Run, Young Township, Bridge
     4             Replacement                                   503,000
     5             (Base Construction Allocation -
     6             $458,000)
     7             (Land Allocation - $5,000)
     8             (Design and Contingencies - $40,000)
     9  Section 37.  Jefferson County.
    10     (a)  Local Bridges
    11         (1)  Barnett Township, T-365, Cathers Run
    12             Bridge over Cathers Run, Bridge
    13             Replacement                                   435,000
    14             (Base Construction Allocation -
    15             $380,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $45,000)
    18         (2)  Eldred Township, T-342, Mill Creek
    19             Bridge over Mill Creek, Bridge
    20             Replacement                                   360,000
    21             (Base Construction Allocation -
    22             $312,000)
    23             (Land Allocation - $8,000)
    24             (Design and Contingencies - $40,000)
    25         (3)  Rose Township, T-567, Coder Run Bridge
    26             over Coder Run, Bridge Replacement            405,000
    27             (Base Construction Allocation -
    28             $347,000)
    29             (Land Allocation - $8,000)
    30             (Design and Contingencies - $50,000)
    19920S1746B2236                 - 85 -

     1     (b)  State Bridges
     2         (1)  S.R.3033, Five Mile Run Bridge over
     3             Five Mile Run, Knox Township, Bridge
     4             Replacement                                   420,000
     5             (Base Construction Allocation -
     6             $370,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $40,000)
     9         (2)  S.R.3033, Sandy Lick Creek Bridge over
    10             Sandy Lick Creek, Brookville Borough,
    11             Bridge Replacement                          1,000,000
    12             (Base Construction Allocation -
    13             $800,000)
    14             (Land Allocation - $75,000)
    15             (Design and Contingencies - $125,000)
    16  Section 38.  Juniata County.
    17     (a)  Local Bridges
    18         (1)  Delaware Township, T-405, Delaware
    19             Creek Bridge, Bridge Replacement              165,000
    20             (Base Construction Allocation -
    21             $155,000)
    22             (Land Allocation - $10,000)
    23     (b)  State Bridges
    24         (1)  S.R.0035, Bridge over Conrail, Mifflin
    25             Borough, Bridge Replacement                 1,600,000
    26             (Base Construction Allocation -
    27             $1,300,000)
    28             (Land Allocation - $150,000)
    29             (Design and Contingencies - $150,000)
    30         (2)  S.R.0035, Bridge over Cocolamus Creek,
    19920S1746B2236                 - 86 -

     1             Monroe Township, Bridge Replacement         1,300,000
     2             (Base Construction Allocation -
     3             $1,000,000)
     4             (Land Allocation - $150,000)
     5             (Design and Contingencies - $150,000)
     6         (3)  S.R.0035, Bridge over Cocolamus Creek,
     7             Fayette Township, Bridge Replacement          650,000
     8             (Base Construction Allocation -
     9             $450,000)
    10             (Land Allocation - $100,000)
    11             (Design and Contingencies - $100,000)
    12         (4)  S.R.0075, Bridge over Hunter's Creek,
    13             Turbett Township, Bridge Replacement        4,200,000
    14             (Base Construction Allocation -
    15             $3,500,000)
    16             (Land Allocation - $300,000)
    17             (Design and Contingencies - $400,000)
    18         (5)  S.R.0075, Bridge over Tuscarora Creek,
    19             Turbett Township, Bridge Replacement        2,550,000
    20             (Base Construction Allocation -
    21             $2,200,000)
    22             (Land Allocation - $150,000)
    23             (Design and Contingencies - $200,000)
    24         (6)  S.R.0075, Bridge over Conrail, Walker
    25             Township, Bridge Replacement                3,000,000
    26             (Base Construction Allocation -
    27             $2,500,000)
    28             (Land Allocation - $200,000)
    29             (Design and Contingencies - $300,000)
    30         (7)  S.R.0235, Bridge over Stoney Run,
    19920S1746B2236                 - 87 -

     1             Greenwood Township, Bridge Replacement        850,000
     2             (Base Construction Allocation -
     3             $650,000)
     4             (Land Allocation - $100,000)
     5             (Design and Contingencies - $100,000)
     6         (8)  S.R.0333, Bridge over Tributary of
     7             Juniata River, Turbett Township, Bridge
     8             Replacement                                   500,000
     9             (Base Construction Allocation -
    10             $300,000)
    11             (Land Allocation - $100,000)
    12             (Design and Contingencies - $100,000)
    13         (9)  S.R.1001, Bridge over Lost Run,
    14             Fermanagh Township, Bridge Replacement        800,000
    15             (Base Construction Allocation -
    16             $600,000)
    17             (Land Allocation - $100,000)
    18             (Design and Contingencies - $100,000)
    19         (10)  S.R.1006, Bridge over Horning Run,
    20             Fermanagh Township, Bridge Replacement        725,000
    21             (Base Construction Allocation -
    22             $500,000)
    23             (Land Allocation - $100,000)
    24             (Design and Contingencies - $125,000)
    25         (11)  S.R.1006, Bridge No.2 over Horning
    26             Run, Fermanagh Township, Bridge
    27             Replacement                                   725,000
    28             (Base Construction Allocation -
    29             $500,000)
    30             (Land Allocation - $100,000)
    19920S1746B2236                 - 88 -

     1             (Design and Contingencies - $125,000)
     2         (12)  S.R.2010, Bridge over Cocolamus
     3             Creek, Delaware Township, Bridge
     4             Replacement                                   900,000
     5             (Base Construction Allocation -
     6             $675,000)
     7             (Land Allocation - $100,000)
     8             (Design and Contingencies - $125,000)
     9         (13)  S.R.2019, Bridge over Cranes Run,
    10             Greenwood Township, Bridge Replacement        650,000
    11             (Base Construction Allocation -
    12             $450,000)
    13             (Land Allocation - $100,000)
    14             (Design and Contingencies - $100,000)
    15         (14)  S.R.3031, Connector Bridge Access to
    16             S.R.0075, Port Royal Borough, Bridge
    17             Replacement                                 1,125,000
    18             (Base Construction Allocation -
    19             $750,000)
    20             (Land Allocation - $200,000)
    21             (Design and Contingencies - $175,000)
    22  Section 39.  Lackawanna County.
    23     (a)  Local Bridges
    24         (1)  Mayfield Borough, Chestnut Street
    25             Bridge over Lackawanna River PI
    26             No.043591229, Bridge Replacement            1,360,000
    27             (Base Construction Allocation -
    28             $1,200,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $150,000)
    19920S1746B2236                 - 89 -

     1         (2)  Archbald Borough, Wayne Street Bridge
     2             over Lackawanna River PI No.043591230,
     3             Bridge Replacement                          1,520,000
     4             (Base Construction Allocation -
     5             $1,350,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $160,000)
     8         (3)  City of Scranton, Ash Street Bridge
     9             over Roaring Brook, Bridge Replacement        900,000
    10             (Base Construction Allocation -
    11             $800,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $90,000)
    14         (4)  City of Scranton, Pocono N.E.R.R.
    15             Culvert over Meadow Brook, Bridge
    16             Replacement                                   180,000
    17             (Base Construction Allocation -
    18             $150,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $20,000)
    21     (b)  State Bridges
    22         (1)  S.R.0106 over Fall Brook PI
    23             No.043591226, Fell Township, Bridge
    24             Replacement                                   880,000
    25             (Base Construction Allocation -
    26             $775,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $95,000)
    29         (2)  S.R.0106 over Tunkhannock Creek PI
    30             No.043591227, Greenfield Township,
    19920S1746B2236                 - 90 -

     1             Bridge Replacement                            685,000
     2             (Base Construction Allocation -
     3             $600,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $75,000)
     6         (3)  S.R.0435 over Conrail Railroad PI
     7             No.043591225, Elmhurst Township, Bridge
     8             Replacement                                 4,520,000
     9             (Base Construction Allocation -
    10             $4,000,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $500,000)
    13         (4)  S.R.2016 over Ponds Creek, Lehigh
    14             Township, Bridge Replacement                  486,000
    15             (Base Construction Allocation -
    16             $425,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $51,000)
    19         (5)  S.R.0435 over S.R.0348 PI
    20             No.043591228, Roaring Brook Township,
    21             Bridge Replacement                            750,000
    22             (Base Construction Allocation -
    23             $660,000)
    24             (Land Allocation - $ 10,000)
    25             (Design and Contingencies - $80,000)
    26         (6)  S.R.0006 over Branch Leggetts Creek PI
    27             No.04359122, South Abington Township,
    28             Bridge Replacement                          1,000,000
    29             (Base Construction Allocation -
    30             $884,000)
    19920S1746B2236                 - 91 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $106,000)
     3         (7)  S.R.2016 over Stegmeir's Pond, Lehigh
     4             Township, Bridge Replacement                  221,000
     5             (Base Construction Allocation -
     6             $188,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $23,000)
     9         (8)  S.R.4019 over Branch Leggetts Creek PI
    10             No.04359128, Abington Township, Bridge
    11             Replacement                                   405,000
    12             (Base Construction Allocation -
    13             $353,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $42,000)
    16         (9)  S.R.0407 over Ackerley Creek PI
    17             No.043591207, Abington Township, Bridge
    18             Replacement                                   653,000
    19             (Base Construction Allocation -
    20             $574,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $69,000)
    23         (10)  S.R.1017 over Chapman Lake Stream PI
    24             No.043591209, Scott Township, Bridge
    25             Replacement                                   558,000
    26             (Base Construction Allocation -
    27             $489,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $59,000)
    30         (11)  S.R.1029 over Hulls Creek PI
    19920S1746B2236                 - 92 -

     1             No.043591210, Scott Township, Bridge
     2             Replacement                                   518,000
     3             (Base Construction Allocation -
     4             $453,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $55,000)
     7         (12)  S.R.2004 over Kellum Creek PI
     8             No.04359121, Madison Township, Bridge
     9             Replacement                                   335,000
    10             (Base Construction Allocation -
    11             $290,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $35,000)
    14         (13)  S.R.0006 over Branch of Leggetts
    15             Creek PI No.043591221, South Abington
    16             Township, Bridge Replacement                  778,000
    17             (Base Construction Allocation -
    18             $686,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $82,000)
    21         (14)  S.R.3005 over Gardners Creek PI
    22             No.043591215, Ransom Township, Bridge
    23             Replacement                                   683,000
    24             (Base Construction Allocation -
    25             $601,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $72,000)
    28         (15)  S.R.2016 over Ponds Creek PI
    29             No.043591214, Lehigh Township, Bridge
    30             Replacement                                   486,000
    19920S1746B2236                 - 93 -

     1             (Base Construction Allocation -
     2             $425,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $51,000)
     5         (16)  S.R.4032 over Summit Lake Creek PI
     6             No.043591219, South Abington Township,
     7             Bridge Replacement                            425,000
     8             (Base Construction Allocation -
     9             $370,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $45,000)
    12         (17)  S.R.4032 over Leggetts Creek PI
    13             No.043591220, South Abington Township,
    14             Bridge Replacement                            615,000
    15             (Base Construction Allocation -
    16             $540,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $65,000)
    19         (18)  S.R.0006 over S.R.0347 PI
    20             No.043591223, Blakely Borough, Bridge
    21             Replacement                                 1,564,000
    22             (Base Construction Allocation -
    23             $1,384,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $160,000)
    26         (19)  S.R.0006 over S.R.0107 PI
    27             No.043591223, Mayfield Borough, Bridge
    28             Replacement                                 2,054,000
    29             (Base Construction Allocation -
    30             $1,825,000)
    19920S1746B2236                 - 94 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $219,000)
     3         (20)  S.R.0690 over Van Brunt Creek PI
     4             No.043591208, Moscow Borough, Bridge
     5             Replacement                                   480,000
     6             (Base Construction Allocation -
     7             $420,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $50,000)
    10         (21)  S.R.0006 over Branch of Leggetts
    11             Creek PI No.043591206, Clarks Summit
    12             Borough, Bridge Replacement                   980,000
    13             (Base Construction Allocation -
    14             $866,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $104,000)
    17         (22)  S.R.3013 over Lackawanna River PI
    18             No.043583205, Old Forge Borough, Bridge
    19             Replacement                                 2,175,000
    20             (Base Construction Allocation -
    21             $1,932,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $233,000)
    24         (23)  S.R.0247 over Lackawanna River PI
    25             No.043591203, Jessup Borough, Bridge
    26             Replacement                                   740,000
    27             (Base Construction Allocation -
    28             $650,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $80,000)
    19920S1746B2236                 - 95 -

     1         (24)  S.R.3017 over Lackawanna River PI
     2             No.043591216, Old Forge Borough, Bridge
     3             Replacement                                 2,193,000
     4             (Base Construction Allocation -
     5             $1,949,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $234,000)
     8         (25)  S.R.3019 over Branch of Lackawanna
     9             River PI No.043591217, Old Forge
    10             Borough, Bridge Replacement                   537,000
    11             (Base Construction Allocation -
    12             $470,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $57,000)
    15         (26)  S.R.3027 over Leggetts Creek PI
    16             No.043589263, City of Scranton, Bridge
    17             Replacement                                   906,000
    18             (Base Construction Allocation -
    19             $800,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $96,000)
    22         (27)  S.R.1033 over Fall Brook PI
    23             No.043591211, City of Carbondale,
    24             Bridge Replacement                            702,000
    25             (Base Construction Allocation -
    26             $618,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $74,000)
    29         (28)  S.R.0006 over South Branch of
    30             Tunkhannock Creek PI No.043591205,
    19920S1746B2236                 - 96 -

     1             LaPlume Township, Bridge Replacement        1,596,000
     2             (Base Construction Allocation -
     3             $1,416,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $170,000)
     6  Section 40.  Lancaster County.
     7     (a)  Local Bridges
     8         (1)  Bart Township, T-389, Drywells Road
     9             over Meetinghouse Creek, Bridge
    10             Replacement                                   420,000
    11             (Base Construction Allocation -
    12             $350,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $60,000)
    15         (2)  Earl Township, T-810, White Oak Road
    16             over Big Conestoga Creek, BMS
    17             36720908100304, Bridge Replacement            585,000
    18             (Base Construction Allocation -
    19             $500,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $75,000)
    22         (3)  East Earl Township, T-894, Quarry Road
    23             over Conestoga River, Bridge
    24             Replacement                                   470,000
    25             (Base Construction Allocation -
    26             $400,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $60,000)
    29         (4)  Ephrata Township, T-648, Royer Road
    30             over Cocalico Creek, Bridge
    19920S1746B2236                 - 97 -

     1             Replacement                                   370,000
     2             (Base Construction Allocation -
     3             $300,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $60,000)
     6         (5)  Rapho Township, T-364, Eby Chickies
     7             Road over Big Chickies Creek, Bridge
     8             Replacement                                   645,000
     9             (Base Construction Allocation -
    10             $550,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $85,000)
    13         (6)  Rapho Township, T-875, Auction Road
    14             over Big Chickies Creek, Bridge
    15             Replacement                                   395,000
    16             (Base Construction Allocation -
    17             $325,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $60,000)
    20         (7)  Salisbury Township, T-487, Buena Vista
    21             Road over Pequea Creek, Bridge
    22             Replacement                                   295,000
    23             (Base Construction Allocation -
    24             $225,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $60,000)
    27         (8)  Salisbury Township, T-904, Mount
    28             Vernon Road over Pequea Creek, Bridge
    29             Replacement                                   270,000
    30             (Base Construction Allocation -
    19920S1746B2236                 - 98 -

     1             $200,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $60,000)
     4         (9)  Pequea Township, T-492, Clearview Road
     5             Bridge over Goods Run, Bridge
     6             Replacement                                    32,000
     7             (Base Construction Allocation -
     8             $25,000)
     9             (Design and Contingencies - $7,000)
    10         (10)  Pequea Township, T-557, Shiprock Road
    11             Bridge over Small Run, Bridge
    12             Replacement                                   105,000
    13             (Base Construction Allocation -
    14             $90,000)
    15             (Design and Contingencies - $15,000)
    16         (11)  Pequea Township, T-557, Millwood Road
    17             Bridge over Goods Run at Intersection
    18             with Rawlinsville Road, Bridge
    19             Replacement                                   102,000
    20             (Base Construction Allocation -
    21             $90,000)
    22             (Design and Contingencies - $12,000)
    23         (12)  Pequea Township, T-557, Indian Hill
    24             Road Bridge over Goods Run, Bridge
    25             Replacement                                    90,000
    26             (Base Construction Allocation -
    27             $80,000)
    28             (Design and Contingencies - $10,000)
    29         (13)  Conestoga Township, T-418, Spring Run
    30             Road Bridge over Unnamed Branch of
    19920S1746B2236                 - 99 -

     1             Tributary No.1 of Conestoga Creek,
     2             Bridge Replacement                            160,000
     3             (Base Construction Allocation -
     4             $130,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $20,000)
     7         (14)  East Drumore Township, T-472, Maxwell
     8             Bridge Road over Tributary to Conowingo
     9             Creek, Bridge Replacement                      70,000
    10             (Base Construction Allocation -
    11             $60,000)
    12             (Design and Contingencies - $10,000)
    13         (15)  Bart Township, T-451, Lamparter Road
    14             Bridge over West Branch of Octorara
    15             Creek, Bridge Replacement                      80,000
    16             (Base Construction Allocation -
    17             $69,000)
    18             (Design and Contingencies - $11,000)
    19         (16)  Lititz Borough, East Lincoln Avenue
    20             Bridge over Santo Domingo Creek, Bridge
    21             Replacement                                   506,000
    22             (Base Construction Allocation -
    23             $440,000)
    24             (Design and Contingencies - $66,000)
    25         (17)  East Hempfield Township, Holland
    26             Street Bridge over AMTRAK, Bridge
    27             Replacement                                   350,000
    28             (Base Construction Allocation -
    29             $285,000)
    30             (Design and Contingencies - $65,000)
    19920S1746B2236                 - 100 -

     1         (18)  East Hempfield Township, Construct
     2             new Bridge on Good Drive over U.S.30,
     3             Bridge Construction                         2,400,000
     4             (Base Construction Allocation -
     5             $1,900,000)
     6             (Land Allocation - $150,000)
     7             (Design and Contingencies - $350,000)
     8     (b)  State Bridges
     9         (1)  S.R.1061, Willow Street over Tributary
    10             of Muddy Creek, Adamstown Borough,
    11             Bridge Replacement                            663,000
    12             (Base Construction Allocation -
    13             $450,000)
    14             (Land Allocation - $55,000)
    15             (Design and Contingencies - $168,000)
    16         (2)  S.R.4009, Dillerville Road over
    17             AMTRAK, Lancaster City, Bridge
    18             Replacement                                 2,080,000
    19             (Base Construction Allocation -
    20             $1,800,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $270,000)
    23         (3)  S.R.0272, Reading Road over Indian
    24             Run, Ephrata Township, Bridge
    25             Replacement                                 1,275,000
    26             (Base Construction Allocation -
    27             $1,100,000)
    28             (Land Allocation - $25,000)
    29             (Design and Contingencies - $150,000)
    30         (4)  S.R.3016, Fairview Road over Conrail,
    19920S1746B2236                 - 101 -

     1             Providence Township, Bridge
     2             Replacement                                 1,605,000
     3             (Base Construction Allocation -
     4             $1,388,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $207,000)
     7         (5)  S.R.3030, Conestoga Boulevard over
     8             Tributary of Conestoga River, Conestoga
     9             Township, Bridge Replacement                  150,000
    10             (Base Construction Allocation -
    11             $100,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $40,000)
    14         (6)  S.R.0222, Railroad Bridge over
    15             S.R.0222, Providence Township, Bridge
    16             Removal                                       300,000
    17             (Base Construction Allocation -
    18             $260,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $30,000)
    21         (7)  S.R.1035, North Water Street Bridge
    22             over Lititz Run, Lititz Borough, Bridge
    23             Replacement                                   253,000
    24             (Base Construction Allocation -
    25             $220,000)
    26             (Design and Contingencies - $33,000)
    27         (8)  S.R.1035, North Water Street Bridge
    28             over Santo Domingo Creek, Lititz
    29             Borough, Bridge Replacement                   253,000
    30             (Base Construction Allocation -
    19920S1746B2236                 - 102 -

     1             $220,000)
     2             (Design and Contingencies - $33,000)
     3  Section 41.  Lawrence County.
     4     (a)  Local Bridges
     5         (1)  Slippery Rock Township, T-741, (old
     6             Route 422) Rose Point Bridge No.1 over
     7             Slippery Rock Creek, Bridge
     8             Replacement                                   870,000
     9             (Base Construction Allocation -
    10             $800,000)
    11             (Land Allocation - $50,000)
    12             (Design and Contingencies - $20,000)
    13         (2)  Plain Grove Township, T-585, Cress
    14             Farm Road over Tributary to Taylor Run,
    15             Bridge Replacement                            120,000
    16             (Base Construction Allocation -
    17             $106,000)
    18             (Design and Contingencies - $14,000)
    19         (3)  Plain Grove Township, T-543, Rodgers
    20             Road over Jameson Run, Bridge
    21             Replacement                                   184,000
    22             (Base Construction Allocation -
    23             $170,000)
    24             (Design and Contingencies - $14,000)
    25         (4)  Plain Grove Township, Black Road over
    26             Taylor Run, Bridge Replacement                 92,000
    27             (Base Construction Allocation -
    28             $83,000)
    29             (Design and Contingencies - $9,000)
    30         (5)  Bridge No.72080537010 over Jameson
    19920S1746B2236                 - 103 -

     1             Run, Bridge Replacement                       139,000
     2             (Base Construction Allocation -
     3             $126,000)
     4             (Design and Contingencies - $13,000)
     5         (6)  Scott Township, Bridge
     6             No.37721004977016, Bridge Replacement       1,141,000
     7             (Base Construction Allocation -
     8             $1,027,000)
     9             (Design and Contingencies - $114,000)
    10         (7)  Bridge No.37720805851003 East of T-498
    11             Intersection, Bridge Replacement              129,000
    12             (Base Construction Allocation -
    13             $116,000)
    14             (Design and Contingencies - $13,000)
    15         (8)  Slippery Rock Township, McConnels Mill
    16             Road over Slippery Rock Creek, Bridge
    17             Replacement                                    78,000
    18             (Base Construction Allocation -
    19             $70,000)
    20             (Design and Contingencies - $8,000)
    21         (9)  Scott Township, Bridge
    22             No.37721004857017, Bridge Replacement         610,000
    23             (Base Construction Allocation -
    24             $549,000)
    25             (Design and Contingencies - $61,000)
    26         (10)  Slippery Rock Township, Kildo Road
    27             Bridge over unnamed stream, Bridge
    28             Replacement                                   581,000
    29             (Base Construction Allocation -
    30             $523,000)
    19920S1746B2236                 - 104 -

     1             (Design and Contingencies - $58,000)
     2         (11)  Bridge No.37720805431009 near T-508,
     3             Bridge Replacement                            332,000
     4             (Base Construction Allocation -
     5             $299,000)
     6             (Design and Contingencies - $33,000)
     7         (12)  Plain Grove Township, Reese Road over
     8             Taylor Run, Bridge Replacement
     9             (Base Construction Allocation - $)
    10             (Land Allocation - $)
    11             (Design and Contingencies - $)
    12     (b)  State Bridges
    13         (1)  S.R.1012, Freue Mill Road over Big
    14             Run, Slippery Rock Township, Bridge
    15             Replacement                                 1,210,000
    16             (Base Construction Allocation -
    17             $1,150,000)
    18             (Land Allocation - $50,000)
    19             (Design and Contingencies - $10,000)
    20         (2)  S.R.1014, Pine Corners Road over I-79,
    21             Plain grove Township, Bridge
    22             Replacement                                   400,000
    23             (Base Construction Allocation -
    24             $250,000)
    25             (Land Allocation - $50,000)
    26             (Design and Contingencies - $100,000)
    27         (3)  S.R.2028, Hills Hollow Road Bridge
    28             over Hill Run, Slippery Rock Township,
    29             Bridge Replacement                            450,000
    30             (Base Construction Allocation -
    19920S1746B2236                 - 105 -

     1             $300,000)
     2             (Land Allocation - $50,000)
     3             (Design and Contingencies - $100,000)
     4         (4)  S.R.2030, Mountville Road Bridge over
     5             Slippery Rock Creek, Slippery Rock &
     6             Perry Townships, Bridge Replacement           400,000
     7             (Base Construction Allocation -
     8             $250,000)
     9             (Land Allocation - $50,000)
    10             (Design and Contingencies - $100,000)
    11         (5)  S.R.0065, L.R.79, East Washington
    12             Street Bridge over Noshannock Creek,
    13             New Castle City, Bridge Replacement         1,650,000
    14             (Base Construction Allocation -
    15             $1,525,000)
    16             (Design and Contingencies - $125,000)
    17         (6)  S.R.0168, CSX & P&LE Underpass, Taylor
    18             Township, Bridge Replacement                1,100,000
    19             (Base Construction Allocation -
    20             $1,000,000)
    21             (Design and Contingencies - $100,000)
    22         (7)  S.R.1016, Liberty Road Bridge over
    23             Taylor Run, Plain grove Township,
    24             Bridge Replacement                            350,000
    25             (Base Construction Allocation -
    26             $200,000)
    27             (Land Allocation - $50,000)
    28             (Design and Contingencies - $100,000)
    29  Section 42.  Lebanon County.
    30     (a)  Local Bridges
    19920S1746B2236                 - 106 -

     1         (1)  North Cornwall Township T-414, Dairy
     2             Road over Quittapahilla Creek, Bridge
     3             Replacement                                   321,000
     4             (Base Construction Allocation -
     5             $251,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $60,000)
     8         (2)  Union Township, T-615, Ridge Road over
     9             Trout Run, Bridge Replacement                 205,000
    10             (Base Construction Allocation -
    11             $135,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $60,000)
    14     (b)  State Bridges (Reserved)
    15  Section 43.  Lehigh County.
    16     (a)  Local Bridges
    17         (1)   Washington Township, T-787, West Gant
    18             Street over Trout Creek, Bridge
    19             Replacement                                   175,000
    20             (Base Construction Allocation -
    21             $135,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $30,000)
    24         (2)  Lowhill Township, T-649, Narris Road
    25             Bridge No.1 over Switzer Creek, Bridge
    26             Replacement                                   145,000
    27             (Base Construction Allocation -
    28             $110,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $25,000)
    19920S1746B2236                 - 107 -

     1         (3)  Whitehall Township, Peach Bottom Road
     2             over Spring Creek, Bridge Replacement         190,000
     3             (Base Construction Allocation -
     4             $135,000)
     5             (Land Allocation - $25,000)
     6             (Design and Contingencies - $30,000)
     7         (4)  Whitehall Township, Eggert Road over
     8             Spring Creek, Bridge Replacement              235,000
     9             (Base Construction Allocation -
    10             $180,000)
    11             (Land Allocation - $25,000)
    12             (Design and Contingencies - $30,000)
    13         (5)  Whitehall Township, Overlook Lane over
    14             Spring Creek, Bridge Replacement              215,000
    15             (Base Construction Allocation -
    16             $160,000)
    17             (Land Allocation - $25,000)
    18             (Design and Contingencies - $30,000)
    19         (6)  Whitehall Township, Columbia Street
    20             over Coplay Creek, Bridge Replacement         385,000
    21             (Base Construction Allocation -
    22             $250,000)
    23             (Land Allocation - $100,000)
    24             (Design and Contingencies - $35,000)
    25         (7)  Lowhill Township, T-649,  Narris Road
    26             Bridge No.2 over Switzer Creek, Bridge
    27             Replacement                                   170,000
    28             (Base Construction Allocation -
    29             $130,000)
    30             (Land Allocation - $10,000)
    19920S1746B2236                 - 108 -

     1             (Design and Contingencies - $30,000)
     2         (8)  Macungie Borough, Hickory Lane over
     3             Tributary to Swabia Creek, Bridge
     4             Replacement                                   160,000
     5             (Base Construction Allocation -
     6             $110,000)
     7             (Land Allocation - $25,000)
     8             (Design and Contingencies - $25,000)
     9         (9)  City of Allentown, Union Boulevard
    10             over Lehigh River, Bridge Replacement       5,520,000
    11             (Base Construction Allocation -
    12             $5,000,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $500,000)
    15         (10)  City of Allentown, Reading Road over
    16             Cedar Creek, Bridge Replacement             1,010,000
    17             (Base Construction Allocation -
    18             $865,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $125,000)
    21         (11)  City of Allentown, Ward Street (15th
    22             Street) over Little Lehigh Creek,
    23             Bridge Replacement                          3,800,000
    24             (Base Construction Allocation -
    25             $3,400,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $380,000)
    28         (12)  City of Allentown, 15th Street Bridge
    29             over Conrail and Little Lehigh Creek,
    30             Bridge Rehabilitation                         750,000
    19920S1746B2236                 - 109 -

     1             (Base Construction Allocation -
     2             $500,000)
     3             (Land Allocation - $100,000
     4             (Design and Contingencies - $150,000)
     5         (13)  North Whitehall Township, T-687,
     6             Lehigh Street Bridge, Bridge
     7             Replacement                                   150,000
     8             (Base Construction Allocation -
     9             $135,000)
    10             (Design and Contingencies - $15,000)
    11         (14)  North Whitehall Township, T-695,
    12             Walnut Street Bridge No.1, Bridge
    13             Rehabilitation                                 83,000
    14             (Base Construction Allocation -
    15             $65,000)
    16             (Design and Contingencies - $18,000)
    17         (15)  North Whitehall Township, T-695,
    18             Walnut Street Bridge No.2, Bridge
    19             Rehabilitation                                105,000
    20             (Base Construction Allocation -
    21             $85,000)
    22             (Design and Contingencies - $20,000)
    23         (16)  North Whitehall Township, T-712
    24             Bridge at Overlook Road and Neffs-
    25             Laurys Road, Bridge Replacement               141,000
    26             (Base Construction Allocation -
    27             $120,000)
    28             (Design and Contingencies - $21,000)
    29         (17)  North Whitehall Township, T-702,
    30             Bridge at Riverview Road and Neffs-
    19920S1746B2236                 - 110 -

     1             Laurys Road, Bridge Replacement               118,000
     2             (Base Construction Allocation -
     3             $100,000)
     4             (Design and Contingencies - $18,000)
     5     (b)  State Bridges
     6         (1)  S.R.0145 over Abandoned Conrail Line,
     7             Whitehall Township, Bridge Replacement        240,000
     8             (Base Construction Allocation -
     9             $200,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $20,000)
    12         (2)  S.R.3001 over Iron Run, Lower Macungie
    13             Township, Bridge Replacement                  624,000
    14             (Base Construction Allocation -
    15             $480,000)
    16             (Land Allocation - $96,000)
    17             (Design and Contingencies - $48,000)
    18         (3)  I-78 over Iron Run, Weisenberg
    19             Township, Bridge Replacement                  120,000
    20             (Base Construction Allocation -
    21             $100,000)
    22             (Design and Contingencies - $20,000)
    23         (4)  S.R.0378 under Easton Avenue, City of
    24             Bethlehem, Bridge Replacement                 812,000
    25             (Base Construction Allocation -
    26             $738,000)
    27             (Design and Contingencies - $74,000)
    28         (5)  S.R.0145 over Tributary to Coplay
    29             Creek, Whitehall Township, Bridge
    30             Replacement                                   225,000
    19920S1746B2236                 - 111 -

     1             (Base Construction Allocation -
     2             $187,000)
     3             (Land Allocation - $19,000)
     4             (Design and Contingencies - $19,000)
     5         (6)  S.R.0378 under Catasaqua Road, City of
     6             Bethlehem, Bridge Replacement                 742,000
     7             (Base Construction Allocation -
     8             $674,000)
     9             (Design and Contingencies - $68,000)
    10         (7)  S.R.1015 over S.R.0022, Whitehall
    11             Township, Bridge Replacement                  569,000
    12             (Base Construction Allocation -
    13             $517,000)
    14             (Design and Contingencies - $52,000)
    15         (8)  S.R.2032 over Spring Creek, Upper
    16             Saucon Township, Bridge Replacement           140,000
    17             (Base Construction Allocation -
    18             $100,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $20,000)
    21         (9)  S.R.0145 over Jordan Creek, City of
    22             Allentown, Bridge Replacement               2,660,000
    23             (Base Construction Allocation -
    24             $2,000,000)
    25             (Land Allocation - $460,000)
    26             (Design and Contingencies - $200,000)
    27         (10)  S.R.2055 Alburtis Meyers Bridge over
    28             Harrison St., Lawrence St., Little
    29             Lehigh Creek and Railroad, City of
    30             Allentown, Bridge Replacement               2,200,000
    19920S1746B2236                 - 112 -

     1             (Base Construction Allocation -
     2             $2,000,000)
     3             (Design and Contingencies - $200,000)
     4         (11)  S.R.2030, Centennial Bridge over
     5             Saucon Creek, Upper Saucon
     6             Township, Bridge Replacement                  386,000
     7             (Base Construction Allocation -
     8             $337,000)
     9             (Land Allocation - $16,000)
    10             (Design and Contingencies - $33,000)
    11         (12)  Tilghman Street Bridge over Lehigh
    12             River, City of Allentown, Bridge
    13             Rehabilitation                              4,100,000
    14             (Base Construction Allocation -
    15             $3,550,000)
    16             (Land Allocation - $100,000)
    17             (Design and Contingencies - $450,000)
    18  Section 44. Luzerne County.
    19     (a)  Local Bridges
    20         (1)  Nescopeck Township, T-376 Bridge over
    21             Nescopeck Creek, Bridge Replacement           418,000
    22             (Base Construction Allocation -
    23             $324,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $84,000)
    26         (2)  Lehman Township, T-581 Bridge over
    27             Inlet Pikes Creek Reservoir, Bridge
    28             Replacement                                   260,000
    29             (Base Construction Allocation -
    30             $194,000)
    19920S1746B2236                 - 113 -

     1             (Land Allocation - $15,000)
     2             (Design and Contingencies - $51,000)
     3         (3)  Ross Township, County Road Bridge No.1
     4             over Hunlock Creek, Bridge Replacement        269,000
     5             (Base Construction Allocation -
     6             $194,000)
     7             (Land Allocation - $15,000
     8             (Design and Contingencies - $60,000
     9         (4)  Kingston Township, County Road Bridge
    10             No.16 over Toby's Creek, Bridge
    11             Replacement                                   379,000
    12             (Base Construction Allocation -
    13             $301,000)
    14             (Design and Contingencies - $78,000)
    15         (5)  Black Creek Township, T-309 Bridge
    16             over Falls Run, Bridge Replacement            280,000
    17             (Base Construction Allocation -
    18             $210,000)
    19             (Land Allocation - $ 15,000
    20             (Design and Contingencies - $55,000)
    21         (6)  Jackson Township, T-704 Bridge over
    22             Branch of Harveys Creek, Bridge
    23             Replacement                                   260,000
    24             (Base Construction Allocation -
    25             $194,000)
    26             (Land Allocation - $15,000
    27             (Design and Contingencies - $51,000)
    28         (7)  Union Township, T-451 Bridge over
    29             Shickshinny Creek, Bridge Replacement         269,000
    30             (Base Construction Allocation -
    19920S1746B2236                 - 114 -

     1             $194,000)
     2             (Land Allocation - $15,000
     3             (Design and Contingencies - $ 60,000)
     4         (8)  Sugarloaf Township, County Road Bridge
     5             No.37 over Little Nescopeck Creek,
     6             Bridge Replacement                            368,000
     7             (Base Construction Allocation -
     8             $292,000)
     9             (Design and Contingencies - $76,000)
    10         (9)  Sugarloaf Township, T-332 Bridge over
    11             Nescopeck Creek, Bridge Replacement           422,000
    12             (Base Construction Allocation -
    13             $335,000)
    14             (Design and Contingencies - $87,000)
    15         (10)  Hanover Township, Oxford Street over
    16             Solomon's Creek, Bridge Replacement           368,000
    17             (Base Construction Allocation -
    18             $292,000)
    19             (Design and Contingencies - $76,000)
    20         (11)  Fairmount Township, T-620 Bridge over
    21             Phillips Creek, Bridge Replacement            277,000
    22             (Base Construction Allocation -
    23             $212,000)
    24             (Design and Contingencies - $65,000)
    25         (12)  Hanover Township, East Division
    26             Street over Solomon's Creek, Bridge
    27             Replacement                                   251,000
    28             (Base Construction Allocation -
    29             $199,000)
    30             (Design and Contingencies - $52,000)
    19920S1746B2236                 - 115 -

     1         (13)  Dorrance Township, T-404 Bridge over
     2             Little Wapwallopen Creek, Bridge
     3             Replacement                                   260,000
     4             (Base Construction Allocation -
     5             $194,000)
     6             (Land Allocation - $ 15,000)
     7             (Design and Contingencies - $51,000)
     8         (14)  Butler Township, County Road Bridge
     9             No.41 over Nescopeck Creek, Bridge
    10             Replacement                                   260,000
    11             (Base Construction Allocation -
    12             $194,000)
    13             (Land Allocation - $15,000)
    14             (Design and Contingencies - $51,000)
    15         (15)  Dorrance Township, T-387 Bridge over
    16             Wapwallopen Creek, Bridge Replacement         341,000
    17             (Base Construction Allocation -
    18             $259,000)
    19             (Land Allocation - $15,000)
    20             (Design and Contingencies - $67,000)
    21         (16)  Dorrance Township, County Road Bridge
    22             No.29 over Wapwallopen Creek, Bridge
    23             Replacement                                   225,000
    24             (Base Construction Allocation -
    25             $160,000)
    26             (Design and Contingencies - $65,000)
    27         (17)  Lehman Township, T-322 Bridge No.14
    28             Maskenozha Bridge over Lake Maskenozha
    29             Outlet, Bridge Replacement                    210,000
    30             (Base Construction Allocation -
    19920S1746B2236                 - 116 -

     1             $165,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $25,000)
     4         (18)  Nescopeck Township, T-453 over
     5             Tributary to Nescopeck Creek
     6             No.044090201, Bridge Replacement              350,000
     7             (Base Construction Allocation -
     8             $300,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $40,000)
    11         (19)  Duryea Borough, Stephenson Street
    12             over Lackawanna River, Bridge
    13             Replacement                                   330,000
    14             (Base Construction Allocation -
    15             $300,000)
    16             (Design and Contingencies - $30,000)
    17         (20)  Dupont Borough, Bridge on Elm Street
    18             over Mill Creek, Bridge Replacement           240,000
    19             (Base Construction Allocation -
    20             $220,000)
    21             (Design and Contingencies - $20,000)
    22         (21)  City of Wilkes-Barre, Govier Street
    23             over Laurel Run Creek, Bridge
    24             Replacement                                    31,000
    25             (Base Construction Allocation -
    26             $25,000)
    27             (Design and Contingencies - $6,000)
    28         (22)  City of Wilkes-Barre, Sidney Street
    29             over Mill Creek, Bridge Replacement            59,000
    30             (Base Construction Allocation -
    19920S1746B2236                 - 117 -

     1             $50,000)
     2             (Design and Contingencies - $9,000)
     3         (23)  City of Wilkes-Barre, Regent Street
     4             over Solomon's Creek, Bridge
     5             Replacement                                    26,000
     6             (Base Construction Allocation -
     7             $20,000)
     8             (Design and Contingencies - $6,000)
     9         (24)  City of Wilkes-Barre, Strauss Street
    10             over Solomon's Creek, Bridge
    11             Replacement                                    16,000
    12             (Base Construction Allocation -
    13             $12,000)
    14             (Design and Contingencies - $4,000)
    15         (25)  City of Wilkes-Barre, Barney Street
    16             over Solomon's Creek, Bridge
    17             Replacement                                    15,000
    18             (Base Construction Allocation -
    19             $11,000)
    20             (Design and Contingencies - $4,000)
    21         (26)  City of Wilkes-Barre, Franklin Street
    22             over Solomon's Creek, Bridge
    23             Replacement                                    59,000
    24             (Base Construction Allocation -
    25             $50,000)
    26             (Design and Contingencies - $9,000)
    27         (27)  City of Wilkes-Barre, Walker Street
    28             over Solomon's Creek, Bridge
    29             Replacement                                   175,000
    30             (Base Construction Allocation -
    19920S1746B2236                 - 118 -

     1             $150,000)
     2             (Design and Contingencies - $25,000)
     3         (28)  City of Wilkes-Barre, Mill Street
     4             over Laurel Run Creek, Bridge
     5             Replacement                                   175,000
     6             (Base Construction Allocation -
     7             $150,000)
     8             (Design and Contingencies - $25,000)
     9         (29)  City of Wilkes-Barre, Scott Street
    10             over Coal Brook, Bridge Replacement           120,000
    11             (Base Construction Allocation -
    12             $100,000)
    13             (Design and Contingencies - $20,000)
    14         (30)  City of Wilkes-Barre, Waller Street
    15             over Solomon's Creek No.044091245,
    16             Bridge Replacement                            175,000
    17             (Base Construction Allocation -
    18             $150,000)
    19             (Design and Contingencies - $25,000)
    20         (31)  Butler Township, County Road Bridge
    21             No.1 over Nescopeck Creek, Bridge
    22             Replacement                                   280,000
    23             (Base Construction Allocation -
    24             $210,000)
    25             (Land Allocation - $15,000)
    26             (Design and Contingencies - $55,000)
    27     (b)  State Bridges
    28         (1)  S.R.2035 Bridge over Little Mill
    29             Creek, Pittston Township, Bridge
    30             Replacement                                   648,000
    19920S1746B2236                 - 119 -

     1             (Base Construction Allocation -
     2             $570,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $68,000)
     5         (2)  S.R.2035 Bridge over Meadow Run, Bear
     6             Creek Township, Bridge Replacement            480,000
     7             (Base Construction Allocation -
     8             $420,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $50,000)
    11         (3)  S.R.2020 Bridge over Branch of Mill
    12             Creek, Plains Township, Bridge
    13             Replacement                                   382,000
    14             (Base Construction Allocation -
    15             $332,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $40,000)
    18         (4)  S.R.2004 Bridge over Railroad, Plains
    19             Township, Bridge Replacement                1,350,000
    20             (Base Construction Allocation -
    21             $1,197,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $143,000)
    24         (5)  S.R.4016 Bridge over Hunlock Creek
    25             No.044091233, Hunlock Township, Bridge
    26             Replacement                                 1,130,000
    27             (Base Construction Allocation -
    28             $1,000,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $120,000)
    19920S1746B2236                 - 120 -

     1         (6)  S.R.1021 Bridge over Abraham's Creek
     2             No.044091234, Kingston Township, Bridge
     3             Replacement                                   540,000
     4             (Base Construction Allocation -
     5             $472,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $58,000)
     8         (7)  S.R.4008 Bridge over Branch of
     9             Huntington Creek No.044091232,
    10             Huntington Township, Bridge
    11             Replacement                                   346,000
    12             (Base Construction Allocation -
    13             $300,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $36,000)
    16         (8)  S.R.4007 Bridge over Shickshinny Creek
    17             No.044091231, Union Township, Bridge
    18             Replacement                                   752,000
    19             (Base Construction Allocation -
    20             $662,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $80,000)
    23         (9)  S.R.1032 Bridge over Pikes Creek
    24             No.0044091225, Lake Township, Bridge
    25             Replacement                                   486,000
    26             (Base Construction Allocation -
    27             $425,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $51,000)
    30         (10)  S.R.0029 Bridge over Abandoned
    19920S1746B2236                 - 121 -

     1             Railroad, Sugar Notch Borough, Bridge
     2             Replacement                                 1,920,000
     3             (Base Construction Allocation -
     4             $1,710,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $200,000)
     7         (11)  S.R.0309 Bridge over Railroad and
     8             Nanticoke Creek, Hanover Township,
     9             Bridge Replacement                          2,760,000
    10             (Base Construction Allocation -
    11             $2,500,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $250,000)
    14         (12)  S.R.0081 Bridge over Conrail
    15             Railroad, Hazle Township, Bridge
    16             Replacement                                 1,540,000
    17             (Base Construction Allocation -
    18             $1,370,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $160,000)
    21         (13)  S.R.0081 Bridge over Conrail
    22             Railroad, Hazle Township, Bridge
    23             Replacement                                 1,540,000
    24             (Base Construction Allocation -
    25             $1,370,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $160,000)
    28         (14)  S.R.1026 Bridge over Leonards Creek,
    29             Dallas Township, Bridge Replacement           570,000
    30             (Base Construction Allocation -
    19920S1746B2236                 - 122 -

     1             $500,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $60,000)
     4         (15)  S.R.0029 Bridge over Haul Road,
     5             Hanover Township, Bridge Replacement        2,925,000
     6             (Base Construction Allocation -
     7             $2,615,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $300,000)
    10         (16)  S.R.1035 Bridge over Cider Run Creek,
    11             Franklin Township, Bridge Replacement         458,000
    12             (Base Construction Allocation -
    13             $400,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $48,000)
    16         (17)  S.R.3005 Bridge over Black Brook,
    17             Slocum Township, Bridge Replacement           587,000
    18             (Base Construction Allocation -
    19             $515,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $62,000)
    22         (18)  S.R.2045 Bridge over Branch of
    23             Wapwallopen Creek, Bridge Replacement         738,000
    24             (Base Construction Allocation -
    25             $650,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $78,000)
    28         (19)  S.R.3005 Bridge over Black Brook,
    29             Slocum Township, Bridge Replacement           620,000
    30             (Base Construction Allocation -
    19920S1746B2236                 - 123 -

     1             $545,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $65,000)
     4         (20)  S.R.3011 Bridge over Wapwallopen
     5             Creek, Hollenback Township, Bridge
     6             Replacement                                   738,000
     7             (Base Construction Allocation -
     8             $650,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $78,000)
    11         (21)  S.R.0029 Bridge over T.R.11, Plymouth
    12             Township, Bridge Replacement                  470,000
    13             (Base Construction Allocation -
    14             $410,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $50,000)
    17         (22)  S.R.3020 Bridge over Branch of Black
    18             Creek, Black Creek Township, Bridge
    19             Replacement                                   540,000
    20             (Base Construction Allocation -
    21             $472,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $58,000)
    24         (23)  S.R.2035 Bridge over Little Mille
    25             Creek, Pittston Township, Bridge
    26             Replacement                                   648,000
    27             (Base Construction Allocation -
    28             $570,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $68,000)
    19920S1746B2236                 - 124 -

     1         (24)  S.R.0239 Bridge over Shickshinny
     2             Creek, Union Township, Bridge
     3             Replacement                                   850,000
     4             (Base Construction Allocation -
     5             $750,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $90,000)
     8         (25)  S.R.1036 Bridge over Leonards Creek,
     9             Kingston Township, Bridge Replacement         775,000
    10             (Base Construction Allocation -
    11             $684,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $81,000)
    14         (26)  S.R.0404 Bridge over Little
    15             Shickshinny Creek, Salem Township,
    16             Bridge Replacement                            822,000
    17             (Base Construction Allocation -
    18             $725,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $87,000)
    21         (27)  S.R.1036 Bridge over Toby Creek,
    22             Kingston Township, Bridge Replacement         640,000
    23             (Base Construction Allocation -
    24             $563,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $67,000)
    27         (28)  S.R.1013 Bridge over Toby Creek,
    28             Luzerne Borough, Bridge Replacement         1,218,000
    29             (Base Construction Allocation -
    30             $1,078,000)
    19920S1746B2236                 - 125 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $130,000)
     3         (29)  S.R.1032 Bridge over Branch of Bear
     4             Hollow Creek, Lake Township, Bridge
     5             Replacement                                   503,000
     6             (Base Construction Allocation -
     7             $440,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $53,000)
    10         (30)  S.R.2008 Bridge over Nanticoke Creek,
    11             Hanover Township, Bridge Replacement          628,000
    12             (Base Construction Allocation -
    13             $552,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $66,000)
    16         (31)  S.R.2005 Bridge over Bowman Spring
    17             Run, City of Wilkes-Barre, Bridge
    18             Replacement                                   510,000
    19             (Base Construction Allocation -
    20             $447,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $53,000)
    23         (32)  S.R.2015 Bridge over Gardner Creek,
    24             Laflin Borough, Bridge Replacement            592,000
    25             (Base Construction Allocation -
    26             $520,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $62,000)
    29         (33)  S.R.2017 Bridge over S.R.3031,
    30             Jenkins Township, Bridge Replacement        1,156,000
    19920S1746B2236                 - 126 -

     1             (Base Construction Allocation -
     2             $1,034,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $112,000)
     5         (34)  S.R.2020 Bridge over Branch of Mill
     6             Creek, Plains Township, Bridge
     7             Replacement                                   382,000
     8             (Base Construction Allocation -
     9             $332,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $40,000)
    12         (35)  S.R.2020 Bridge over Mill Creek,
    13             Plains Township, Bridge Replacement           727,000
    14             (Base Construction Allocation -
    15             $640,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $77,000)
    18         (36)  S.R.2026 Bridge over Gardners Creek,
    19             Laflin Borough, Bridge Replacement            772,000
    20             (Base Construction Allocation -
    21             $680,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $82,000)
    24         (37)  S.R.0118 Bridge over Branch of
    25             Harveys Creek, Lehman Township, Bridge
    26             Replacement                                   604,000
    27             (Base Construction Allocation -
    28             $530,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $64,000)
    19920S1746B2236                 - 127 -

     1         (38)  S.R.1010 Bridge over Abrahams Creek,
     2             West Wyoming Borough, Bridge
     3             Replacement                                 1,230,000
     4             (Base Construction Allocation -
     5             $1,087,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $133,000)
     8         (39)  S.R.2002 Bridge over Solomon's Creek,
     9             Hanover Township, Bridge Replacement        1,475,000
    10             (Base Construction Allocation -
    11             $1,308,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $157,000)
    14         (40)  S.R.2029 Bridge over Mill Creek,
    15             Avoca Borough, Bridge Replacement             984,000
    16             (Base Construction Allocation -
    17             $870,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $104,000)
    20         (41)  S.R.2035 Bridge over Branch of Meadow
    21             Run, Bear Creek Township, Bridge
    22             Replacement                                   525,000
    23             (Base Construction Allocation -
    24             $460,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $55,000)
    27         (42)  S.R.2035 Bridge over Bear Creek, Bear
    28             Creek Township, Bridge Replacement            452,000
    29             (Base Construction Allocation -
    30             $395,000)
    19920S1746B2236                 - 128 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $37,000)
     3         (43)  S.R. 2020 Bridge over Mill Creek,
     4             Plains Township, Bridge Replacement           727,000
     5             (Base Construction Allocation -
     6             $640,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $77,000)
     9         (44)  S.R.2017 Bridge over S.R.2021,
    10             Jenkins Township, Bridge Replacement        1,156,000
    11             (Base Construction Allocation -
    12             $1,034,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $112,000)
    15         (45)  S.R.2021 Culvert Segment 0020, Offset
    16             2190, Pittston Township, Bridge
    17             Replacement                                   300,000
    18             (Base Construction Allocation -
    19             $260,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $30,000)
    22         (46)  S.R.2024 Culvert Segment 0110, Offset
    23             0000 PI No.044092201, Jenkins Township,
    24             Bridge Replacement                            200,000
    25             (Base Construction Allocation -
    26             $170,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $20,000)
    29  Section 45.  Lycoming County.
    30     (a)  Local Bridges
    19920S1746B2236                 - 129 -

     1         (1)  Armstrong Township, T-329 over
     2             Mosquito Creek, Bridge Replacement            427,000
     3             (Base Construction Allocation -
     4             $342,000)
     5             (Land Allocation - $21,000)
     6             (Design and Contingencies - $64,000)
     7         (2)  Armstrong Township, T-434 over
     8             Mosquito Creek, Bridge Replacement            541,000
     9             (Base Construction Allocation -
    10             $433,000)
    11             (Land Allocation - $27,000)
    12             (Design and Contingencies - $81,000)
    13         (3)  Brown Township, T-762 over Jacobs Run,
    14             Bridge Replacement                            411,000
    15             (Base Construction Allocation -
    16             $329,000)
    17             (Land Allocation - $21,000)
    18             (Design and Contingencies - $61,000)
    19         (4)  Cascade Township, T-665 over Potash
    20             Hollow Creek, Bridge Replacement              214,000
    21             (Base Construction Allocation -
    22             $171,000)
    23             (Land Allocation - $11,000)
    24             (Design and Contingencies - $32,000)
    25         (5)  Franklin Township, T-710 over Beaver
    26             Run, Bridge Replacement                       265,000
    27             (Base Construction Allocation -
    28             $212,000)
    29             (Land Allocation - $13,000)
    30             (Design and Contingencies - $40,000)
    19920S1746B2236                 - 130 -

     1         (6)  Hepburn Township, T-510 over Mill
     2             Creek, Bridge Replacement                     303,000
     3             (Base Construction Allocation -
     4             $257,000)
     5             (Design and Contingencies - $46,000)
     6         (7)  Jordan Township, T-740 over Muncy
     7             Creek, Northeast of Lairdsville, Bridge
     8             Replacement                                   321,000
     9             (Base Construction Allocation -
    10             $269,000)
    11             (Land Allocation - $29,000)
    12             (Design and Contingencies - $23,000)
    13         (8)  Lewis Township, T-856 over Pleasant
    14             Stream, Bridge Replacement                    424,000
    15             (Base Construction Allocation -
    16             $302,000)
    17             (Land Allocation - $19,000)
    18             (Design and Contingencies - $103,000)
    19         (9)  Lewis Township, T-629 over Slacks Run,
    20             Bridge Replacement                            356,000
    21             (Base Construction Allocation -
    22             $285,000)
    23             (Land Allocation - $18,000)
    24             (Design and Contingencies - $53,000)
    25         (10)  Lewis Township, T-836 over Trout Run,
    26             Bridge Replacement                            321,000
    27             (Base Construction Allocation -
    28             $257,000)
    29             (Land Allocation - $16,000)
    30             (Design and Contingencies - $48,000)
    19920S1746B2236                 - 131 -

     1         (11)  Moreland Township, T-664 over German
     2             Run, Bridge Replacement                       300,000
     3             (Base Construction Allocation -
     4             $240,000)
     5             (Land Allocation - $15,000)
     6             (Design and Contingencies - $45,000)
     7         (12)  Moreland Township, T-668, Kramer Hill
     8             Road over Sugar Run, Bridge
     9             Replacement                                   245,000
    10             (Base Construction Allocation -
    11             $196,000)
    12             (Land Allocation - $12,000)
    13             (Design and Contingencies - $37,000)
    14         (13)  Moreland Township, T-447 over Laurel
    15             Run No.1, Bridge Replacement                  311,000
    16             (Base Construction Allocation -
    17             $264,000)
    18             (Land Allocation - $15,000)
    19             (Design and Contingencies - $32,000)
    20         (14)  Moreland Township, T-638 over Laurel
    21             Run, Bridge Replacement                       285,000
    22             (Base Construction Allocation -
    23             $228,000)
    24             (Land Allocation - $14,000)
    25             (Design and Contingencies - $43,000)
    26         (15)  Penn Township, T-654 over Greggs Run,
    27             Bridge Replacement                            225,000
    28             (Base Construction Allocation -
    29             $180,000)
    30             (Land Allocation - $11,000)
    19920S1746B2236                 - 132 -

     1             (Design and Contingencies - $34,000)
     2         (16)  Penn/Franklin Township, T-706 over
     3             Beaver Run, Bridge Replacement                272,000
     4             (Base Construction Allocation -
     5             $217,000)
     6             (Land Allocation - $14,000)
     7             (Design and Contingencies - $41,000)
     8         (17)  Pine Township, T-776 over English Run
     9             No.2, Bridge Replacement                      325,000
    10             (Base Construction Allocation -
    11             $260,000)
    12             (Land Allocation - $16,000)
    13             (Design and Contingencies - $49,000)
    14         (18)  Pine Township, T-782 over Rock Run,
    15             Bridge Replacement                            225,000
    16             (Base Construction Allocation -
    17             $180,000)
    18             (Land Allocation - $11,000)
    19             (Design and Contingencies - $34,000)
    20         (19)  Pine Township, T-782 over Texas Creek
    21             No.1, Bridge Replacement                      484,000
    22             (Base Construction Allocation -
    23             $387,000)
    24             (Land Allocation - $24,000)
    25             (Design and Contingencies - $73,000)
    26         (20)  Shrewsbury Township, T-658 over Big
    27             Run, Bridge Replacement                       250,000
    28             (Base Construction Allocation -
    29             $210,000)
    30             (Land Allocation - $10,000)
    19920S1746B2236                 - 133 -

     1             (Design and Contingencies - $30,000)
     2         (21)  Shrewsbury Township, T-686 over Rock
     3             Run No.1, Bridge Replacement                  305,000
     4             (Base Construction Allocation -
     5             $244,000)
     6             (Land Allocation - $15,000)
     7             (Design and Contingencies - $46,000)
     8         (22)  Shrewsbury Township, T-686 over Rock
     9             Run No.2, Bridge Replacement                  262,000
    10             (Base Construction Allocation -
    11             $202,000)
    12             (Land Allocation - $13,000)
    13             (Design and Contingencies - $47,000)
    14         (23)  Washington Township, T-397 over White
    15             Deer Hole Creek, Bridge Replacement           204,000
    16             (Base Construction Allocation -
    17             $170,000)
    18             (Land Allocation - $19,000)
    19             (Design and Contingencies - $15,000)
    20         (24)  Wolf Township, T-250 over Greggs Run,
    21             Bridge Replacement                            290,000
    22             (Base Construction Allocation -
    23             $245,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $35,000)
    26         (25)  Loyalsock Township, Miller Street
    27             between Williamsport City Line and
    28             Warren Avenue, Bridge Replacement             250,000
    29             (Base Construction Allocation -
    30             $200,000)
    19920S1746B2236                 - 134 -

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $30,000)
     3     (b)  State Bridges
     4         (1)  S.R.3018, T-842, First Forks Road
     5             Bridge over First Fork Larrys Creek,
     6             Mifflin Township, Bridge Replacement          425,000
     7             (Base Construction Allocation -
     8             $340,000)
     9             (Land Allocation - $64,000)
    10             (Design and Contingencies - $21,000)
    11  Section 46.  McKean County.
    12     (a)  Local Bridges (Reserved)
    13     (b)  State Bridges
    14         (1)  S.R.0046, Haven Brook Bridge over
    15             Havens Brook, Norwich Township, Bridge
    16             Replacement                                   700,000
    17             (Base Construction Allocation -
    18             $500,000)
    19             (Land Allocation - $100,000)
    20             (Design and Contingencies - $100,000)
    21         (2)  S.R.0770, Sheppard Run Bridge over
    22             Sheppard Run, Bradford Township, Bridge
    23             Replacement                                   725,000
    24             (Base Construction Allocation -
    25             $525,000)
    26             (Land Allocation - $100,000)
    27             (Design and Contingencies - $100,000)
    28         (3)  S.R.0046 Bridge over Havens Brook,
    29             Norwich Township, Bridge Replacement          700,000
    30             (Base Construction Allocation -
    19920S1746B2236                 - 135 -

     1             $500,000)
     2             (Land Allocation - $100,000)
     3             (Design and Contingencies - $100,000)
     4         (4)  S.R.0770 Bridge over Sheppard Run,
     5             Bradford Township, Bridge Replacement         725,000
     6             (Base Construction Allocation -
     7             $525,000)
     8             (Land Allocation - $100,000)
     9             (Design and Contingencies - $100,000)
    10         (5)  S.R.0006 Bridge over Allegheny River,
    11             Port Allegheny Borough, Bridge
    12             Replacement                                 4,050,000
    13             (Base Construction Allocation -
    14             $3,600,000)
    15             (Land Allocation - $150,000)
    16             (Design and Contingencies - $300,000)
    17         (6)  S.R.0006 Bridge over Conrail, Port
    18             Allegheny Borough, Bridge Replacement       1,850,000
    19             (Base Construction Allocation -
    20             $1,500,000)
    21             (Land Allocation - $150,000)
    22             (Design and Contingencies - $200,000)
    23         (7)  S.R.0155 Bridge over Allegheny River,
    24             Port Allegheny Borough, Bridge
    25             Replacement                                 2,550,000
    26             (Base Construction Allocation -
    27             $2,150,000)
    28             (Land Allocation - $150,000)
    29             (Design and Contingencies - $250,000)
    30         (8)  S.R.0155 Bridge over Rock Run, Annin
    19920S1746B2236                 - 136 -

     1             Township, Bridge Replacement                  650,000
     2             (Base Construction Allocation -
     3             $450,000)
     4             (Land Allocation - $100,000)
     5             (Design and Contingencies - $100,000)
     6         (9)  S.R.0219, Bradford Bypass Bridge over
     7             S.R.0346 and S.R.4013, Foster Township,
     8             Bridge Replacement                            250,000
     9             (Base Construction Allocation -
    10             $200,000)
    11             (Design and Contingencies - $50,000)
    12         (10)  S.R.3006 Bridge over Kinzua Creek,
    13             Lafayette Township, Bridge Replacement      1,250,000
    14             (Base Construction Allocation -
    15             $950,000)
    16             (Land Allocation - $150,000)
    17             (Design and Contingencies - $150,000)
    18         (11)  S.R.4004, Tunungawant Creek Bridge
    19             No.1 over West Branch of Tunungawant
    20             Creek, Bradford Township, Bridge
    21             Replacement                                 1,250,000
    22             (Base Construction Allocation -
    23             $1,000,000)
    24             (Land Allocation - $100,000)
    25             (Design and Contingencies - $150,000)
    26  Section 47.  Mercer County.
    27     (a)  Local Bridges
    28         (1)  Bridge No.43710104232323, Bridge
    29             Replacement                                   315,000
    30             (Base Construction Allocation -
    19920S1746B2236                 - 137 -

     1             $280,000)
     2             (Land Allocation - $5,000)
     3             (Design and Contingencies - $30,000)
     4         (2)  Fairview Township, McCartney Road,
     5             Bridge Replacement                            208,000
     6             (Base Construction Allocation -
     7             $180,000)
     8             (Land Allocation - $5,000)
     9             (Design and Contingencies - $23,000)
    10         (3)  Findley Township, Cribbs Road, Bridge
    11             Replacement                                   230,000
    12             (Base Construction Allocation -
    13             $200,000)
    14             (Land Allocation - $5,000)
    15             (Design and Contingencies - $25,000)
    16         (4)  Coalspring Township, McEwen Road,
    17             Bridge Replacement                            208,000
    18             (Base Construction Allocation -
    19             $180,000)
    20             (Land Allocation - $5,000)
    21             (Design and Contingencies - $23,000)
    22         (5)  Hermitage Borough, Kelly Road, Bridge
    23             Replacement                                   851,000
    24             (Base Construction Allocation -
    25             $784,000)
    26             (Land Allocation - $7,000)
    27             (Design and Contingencies - $60,000)
    28         (6)  Hempfield Township, Blahert Road,
    29             Bridge Replacement                            220,000
    30             (Base Construction Allocation -
    19920S1746B2236                 - 138 -

     1             $190,000)
     2             (Land Allocation - $5,000)
     3             (Design and Contingencies - $25,000)
     4         (7)  Perry Township, Pierson Road, Bridge
     5             Replacement                                   647,000
     6             (Base Construction Allocation -
     7             $558,000)
     8             (Land Allocation - $5,000)
     9             (Design and Contingencies - $84,000)
    10         (8)  Jefferson Township, Fullingmill Road,
    11             Bridge Replacement                            230,000
    12             (Base Construction Allocation -
    13             $200,000)
    14             (Land Allocation - $5,000)
    15             (Design and Contingencies - $25,000)
    16         (9)  Hermitage Borough, Kelley Road, Bridge
    17             Replacement                                 1,020,000
    18             (Base Construction Allocation -
    19             $941,000)
    20             (Land Allocation - $7,000)
    21             (Design and Contingencies - $72,000)
    22         (10)  Lake Township, Cannon Road, Bridge
    23             Replacement                                   414,000
    24             (Base Construction Allocation -
    25             $335,000)
    26             (Land Allocation - $5,000)
    27             (Design and Contingencies - $74,000)
    28         (11)  Grove City, East Pine Street, Bridge
    29             Replacement                                   867,000
    30             (Base Construction Allocation -
    19920S1746B2236                 - 139 -

     1             $794,000)
     2             (Land Allocation - $5,000)
     3             (Design and Contingencies - $68,000)
     4         (12)  City of Sharon, Oakland Avenue,
     5             Bridge Replacement                          3,757,000
     6             (Base Construction Allocation -
     7             $3,180,000)
     8             (Land Allocation - $100,000)
     9             (Design and Contingencies - $477,000)
    10         (13)  French Creek Township, Lower Road,
    11             Bridge Replacement                            398,000
    12             (Base Construction Allocation -
    13             $320,000)
    14             (Land Allocation - $5,000)
    15             (Design and Contingencies - $73,000)
    16         (14)  Wolf Creek Township, Jack Road,
    17             Bridge Replacement                            320,000
    18             (Base Construction Allocation -
    19             $274,000)
    20             (Land Allocation - $5,000)
    21             (Design and Contingencies - $41,000)
    22         (15)  Sandy Lake, Walnut Street, Bridge
    23             Replacement                                   230,000
    24             (Base Construction Allocation -
    25             $200,000)
    26             (Land Allocation - $5,000)
    27             (Design and Contingencies - $25,000)
    28         (16)  Perry Township, Mill Road, Bridge
    29             Replacement                                   593,000
    30             (Base Construction Allocation -
    19920S1746B2236                 - 140 -

     1             $511,000)
     2             (Land Allocation - $5,000)
     3             (Design and Contingencies - $77,000)
     4         (17)  New Vernon Township, Betty Boyde
     5             Road, Bridge Replacement                      208,000
     6             (Base Construction Allocation -
     7             $180,000)
     8             (Land Allocation - $5,000)
     9             (Design and Contingencies - $23,000)
    10         (18)  Fairview Township, Genger Road,
    11             Bridge Replacement                            208,000
    12             (Base Construction Allocation -
    13             $180,000)
    14             (Land Allocation - $5,000)
    15             (Design and Contingencies - $23,000)
    16         (19)  Lake Township, Steckler Road, Bridge
    17             Replacement                                   230,000
    18             (Base Construction Allocation -
    19             $200,000)
    20             (Land Allocation - $5,000)
    21             (Design and Contingencies - $25,000)
    22         (20)  Shenango Township, Riggs Road, Bridge
    23             Replacement                                   252,000
    24             (Base Construction Allocation -
    25             $220,000)
    26             (Land Allocation - $5,000)
    27             (Design and Contingencies - $27,000)
    28         (21)  Wolf Creek Township, Gill Road,
    29             Bridge Replacement                            230,000
    30             (Base Construction Allocation -
    19920S1746B2236                 - 141 -

     1             $200,000)
     2             (Land Allocation - $5,000)
     3             (Design and Contingencies - $25,000)
     4         (22)  Greenville, Race Street, Bridge
     5             Replacement                                   778,000
     6             (Base Construction Allocation -
     7             $672,000)
     8             (Land Allocation - $5,000)
     9             (Design and Contingencies - $101,000)
    10         (23)  Sugar Grove Township, Gardner Hill
    11             Road, Bridge Replacement                      230,000
    12             (Base Construction Allocation -
    13             $200,000)
    14             (Land Allocation - $5,000)
    15             (Design and Contingencies - $25,000)
    16         (24)  Findley Township, Uber Road, Bridge
    17             Replacement                                   208,000
    18             (Base Construction Allocation -
    19             $180,000)
    20             (Land Allocation - $5,000)
    21             (Design and Contingencies - $23,000)
    22         (25)  Mill Creek Township, Deemers Road,
    23             Bridge Replacement                            285,000
    24             (Base Construction Allocation -
    25             $250,000)
    26             (Land Allocation - $5,000)
    27             (Design and Contingencies - $30,000)
    28         (26)  Wolf Creek Township, Gilmore Road,
    29             Bridge Replacement                            208,000
    30             (Base Construction Allocation -
    19920S1746B2236                 - 142 -

     1             $180,000)
     2             (Land Allocation - $5,000)
     3             (Design and Contingencies - $23,000)
     4         (27)  Grove City, Chestnut Street, Bridge
     5             Replacement                                 2,871,000
     6             (Base Construction Allocation -
     7             $2,666,000)
     8             (Land Allocation - $5,000)
     9             (Design and Contingencies - $200,000)
    10         (28)  Sandy Creek Township, County Line
    11             Road, Bridge Replacement                      297,000
    12             (Base Construction Allocation -
    13             $254,000)
    14             (Land Allocation - $5,000)
    15             (Design and Contingencies - $38,000)
    16         (29)  Lake Township, Farm Road, Bridge
    17             Replacement                                   208,000
    18             (Base Construction Allocation -
    19             $180,000)
    20             (Land Allocation - $5,000)
    21             (Design and Contingencies - $23,000)
    22         (30)  West Middlesex, Cemetary Road, Bridge
    23             Replacement                                   297,000
    24             (Base Construction Allocation -
    25             $254,000)
    26             (Land Allocation - $5,000)
    27             (Design and Contingencies - $38,000)
    28         (31)  Jefferson Township, Clay Furnace
    29             Road, Bridge Replacement                      208,000
    30             (Base Construction Allocation -
    19920S1746B2236                 - 143 -

     1             $180,000)
     2             (Land Allocation - $5,000)
     3             (Design and Contingencies - $23,000)
     4         (32)  Jackson Township, Fox Mine Road,
     5             Bridge Replacement                            230,000
     6             (Base Construction Allocation -
     7             $200,000)
     8             (Land Allocation - $5,000)
     9             (Design and Contingencies - $25,000)
    10         (33)  City of Hermitage, T-388, Kelly Road
    11             Bridge No.1 over Shenango River, Bridge
    12             Replacement                                   851,000
    13             (Base Construction Allocation -
    14             $784,000)
    15             (Land Allocation - $7,000)
    16             (Design and Contingencies - $60,000)
    17     (b)  State Bridges
    18         (1)  S.R.0062 over Shenango River, Bridge
    19             Replacement                                 1,550,000
    20             (Base Construction Allocation -
    21             $1,400,000)
    22             (Land Allocation - $50,000)
    23             (Design and Contingencies - $100,000)
    24         (2)  S.R.0062 over South Dock Valley Way,
    25             Bridge Replacement                          1,850,000
    26             (Base Construction Allocation -
    27             $1,700,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $100,000)
    30         (3)  S.R.0062 over Conrail Railroad, Bridge
    19920S1746B2236                 - 144 -

     1             Replacement                                 1,750,000
     2             (Base Construction Allocation -
     3             $1,600,000)
     4             (Land Allocation - $50,000)
     5             (Design and Contingencies - $100,000)
     6         (4)  S.R.0058 on Kinsman Road over Sugar
     7             Run, Greene Township, Bridge
     8             Replacement                                   300,000
     9             (Base Construction Allocation -
    10             $255,000)
    11             (Land Allocation - $15,000)
    12             (Design and Contingencies - $30,000)
    13         (5)  S.R.3022 on Rutledge Road over
    14             Lackawannock Creek, Jefferson Township,
    15             Bridge Replacement                            300,000
    16             (Base Construction Allocation -
    17             $255,000)
    18             (Land Allocation - $15,000)
    19             (Design and Contingencies - $30,000)
    20         (6)  S.R.0318 on West Middlesex-Mercer Road
    21             over Little Neshannock Creek, East
    22             Lackawannock Township, Bridge
    23             Replacement                                   430,000
    24             (Base Construction Allocation -
    25             $365,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $45,000)
    28         (7)  S.R.3013 on Orchard Road over
    29             Interstate 80, BMS 4330130070000,
    30             Lackawannock Township, Bridge
    19920S1746B2236                 - 145 -

     1             Rehabilitation                                900,000
     2             (Base Construction Allocation -
     3             $765,000)
     4             (Land Allocation - $45,000)
     5             (Design and Contingencies - $90,000)
     6         (8)  S.R.0019 on Perry Highway over
     7             Tributary of Little Shenango River,
     8             Perry Township, Bridge Replacement            210,000
     9             (Base Construction Allocation -
    10             $180,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $20,000)
    13         (9)  S.R.0718 on State Street over Shenango
    14             River, City of Sharon, Bridge
    15             Rehabilitation                                800,000
    16             (Base Construction Allocation -
    17             $680,000)
    18             (Land Allocation - $40,000)
    19             (Design and Contingencies - $80,000)
    20  Section 48.  Mifflin County.
    21     (a)  Local Bridges (Reserved)
    22     (b)  State Bridges
    23         (1)  S.R.3021, Newton Hamilton Bridge over
    24             Juniata River, Newton Hamilton Borough,
    25             Bridge Replacement                          5,250,000
    26             (Base Construction Allocation -
    27             $4,750,000)
    28             (Land Allocation - $200,000)
    29             (Design and Contingencies - $300,000)
    30         (2)  S.R.0522 Bridge over Branch of Jacks
    19920S1746B2236                 - 146 -

     1             Creek, Decatur Township, Bridge
     2             Replacement                                   600,000
     3             (Base Construction Allocation -
     4             $400,000)
     5             (Land Allocation - $100,000)
     6             (Design and Contingencies - $100,000)
     7         (3)  S.R.2007 Bridge over Kishacoquillas
     8             Creek, Derry Township, Bridge
     9             Replacement                                   925,000
    10             (Base Construction Allocation -
    11             $700,000)
    12             (Land Allocation - $100,000)
    13             (Design and Contingencies - $125,000)
    14  Section 49.  Monroe County.
    15     (a)  Local Bridges
    16         (1)  Tunkhannock Township, T-629, over
    17             Tunkhannock Creek, Bridge Replacement         190,000
    18             (Base Construction Allocation -
    19             $140,000)
    20             (Land Allocation - $20,000)
    21             (Design and Contingencies - $30,000)
    22         (2)  Tunkhannock Township, T-633, Bridge
    23             over Tunkhannock Creek, Bridge
    24             Replacement                                   139,000
    25             (Base Construction Allocation -
    26             $121,000)
    27             (Land Allocation - $6,000)
    28             (Design and Contingencies - $12,000)
    29         (3)  Stroud Township, T-410 Bridge over
    30             Cherry Creek, Bridge Replacement              127,000
    19920S1746B2236                 - 147 -

     1             (Base Construction Allocation -
     2             $110,000)
     3             (Land Allocation - $6,000)
     4             (Design and Contingencies - $11,000)
     5         (4)  Hamilton Township, T-202, Lake Circle
     6             Bridge, Bridge Replacement                    126,000
     7             (Base Construction Allocation -
     8             $101,000)
     9             (Land Allocation - $5,000)
    10             (Design and Contingencies - $20,000)
    11         (5)  Hamilton Township, T-414, Bridge No.7,
    12             Bridge Replacement                            522,000
    13             (Base Construction Allocation -
    14             $457,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $45,000)
    17         (6)  Jackson Township, T-486, Trout Lake
    18             Bridge, Bridge Replacement                    184,000
    19             (Base Construction Allocation -
    20             $160,000)
    21             (Land Allocation - $8,000)
    22             (Design and Contingencies - $16,000)
    23         (7)  Stroud Township, T-420, Bridge over
    24             Cherry Creek, Bridge Replacement              169,000
    25             (Base Construction Allocation -
    26             $143,000)
    27             (Land Allocation - $6,000)
    28             (Design and Contingencies - $20,000)
    29         (8)  Smithfield Township, T-539, Bridge
    30             over Marshalls Creek, Bridge
    19920S1746B2236                 - 148 -

     1             Replacement                                   298,000
     2             (Base Construction Allocation -
     3             $267,000)
     4             (Land Allocation - $5,000)
     5             (Design and Contingencies - $26,000)
     6     (b)  State Bridges
     7         (1)  S.R.0402 at Ressica Falls, Middle
     8             Smithfield Township, Bridge
     9             Replacement                                 1,426,000
    10             (Base Construction Allocation -
    11             $1,060,000)
    12             (Land Allocation - $60,000)
    13             (Design and Contingencies - $306,000)
    14         (2)  S.R.0033 over S.R.0209, Hamilton
    15             Township, Bridge Replacement                  195,000
    16             (Base Construction Allocation -
    17             $177,000)
    18             (Design and Contingencies - $18,000)
    19         (3)  S.R.2012 Hamilton East Road over
    20             McMichael Creek, Hamilton Township,
    21             Bridge Replacement                            140,000
    22             (Base Construction Allocation -
    23             $100,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $20,000)
    26         (4)  S.R.2004 over S.R.0033, Hamilton
    27             Township, Bridge Replacement                  335,000
    28             (Base Construction Allocation -
    29             $304,000)
    30             (Design and Contingencies - $31,000)
    19920S1746B2236                 - 149 -

     1         (5)  S.R.2003 over Cherry Creek, Hamilton
     2             Township, Bridge Replacement                  137,000
     3             (Base Construction Allocation -
     4             $79,000)
     5             (Land Allocation - $5,000)
     6             (Design and Contingencies - $53,000)
     7         (6)  S.R.3018 over Kettle Creek II,
     8             Hamilton Township, Bridge Replacement          68,000
     9             (Base Construction Allocation -
    10             $59,000)
    11             (Land Allocation - $3,000)
    12             (Design and Contingencies - $6,000)
    13         (7)  S.R.3018 over Kettle Creek I, Hamilton
    14             Township, Bridge Replacement                   80,000
    15             (Base Construction Allocation -
    16             $70,000)
    17             (Land Allocation - $3,000)
    18             (Design and Contingencies - $7,000)
    19         (8)  S.R.2017 over I-80, East Stroudsburg
    20             Borough, Bridge Replacement                   381,000
    21             (Base Construction Allocation -
    22             $317,000)
    23             (Design and Contingencies - $64,000)
    24         (9)  S.R.0080 Water Gap Bridge over Cherry
    25             Creek, Delaware Water Gap, Bridge
    26             Replacement                                   795,000
    27             (Base Construction Allocation -
    28             $723,000)
    29             (Design and Contingencies - $72,000)
    30         (10)  S.R.0447 at Leavetts Branch, Barrett
    19920S1746B2236                 - 150 -

     1             Township, Bridge Replacement                  255,000
     2             (Base Construction Allocation -
     3             $175,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $70,000)
     6         (11)  S.R.0611 at Erie/Lackawanna Railroad,
     7             Coolbaugh Township, Bridge Replacement        608,000
     8             (Base Construction Allocation -
     9             $521,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $77,000)
    12         (12)  S.R.0423 over Tobyhanna Creek,
    13             Coolbaugh Township, Bridge Replacement        194,000
    14             (Base Construction Allocation -
    15             $163,000)
    16             (Design and Contingencies - $31,000)
    17         (13)  S.R.2030 over I-80, Delaware Water
    18             Gap, Bridge Replacement                       450,000
    19             (Base Construction Allocation -
    20             $409,000)
    21             (Design and Contingencies - $41,000)
    22         (14)  S.R.1014 over Wallenpaupack Creek,
    23             Coolbaugh Township, Bridge Replacement        140,000
    24             (Base Construction Allocation -
    25             $100,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $20,000)
    28         (15)  S.R.4007 over Steamtown Railroad,
    29             Mount Pocono Borough, Bridge
    30             Replacement                                   820,000
    19920S1746B2236                 - 151 -

     1             (Base Construction Allocation -
     2             $700,000)
     3             (Land Allocation - $50,000)
     4             (Design and Contingencies - $70,000)
     5         (16)  S.R.3022 over McMichaels Creek,
     6             Hamilton Township, Bridge Replacement         161,000
     7             (Base Construction Allocation -
     8             $140,000)
     9             (Land Allocation - $7,000)
    10             (Design and Contingencies - $14,000)
    11         (17)  S.R.4001 at Long Pond, Tunkhannock
    12             Township, Bridge Replacement                  425,000
    13             (Base Construction Allocation -
    14             $300,000)
    15             (Land Allocation - $50,000)
    16             (Design and Contingencies - $75,000)
    17         (18)  S.R.0940 at Pocono Summit, Tobyhanna
    18             Township, Bridge Replacement                4,850,000
    19             (Base Construction Allocation -
    20             $4,600,000)
    21             (Land Allocation - $50,000)
    22             (Design and Contingencies - $200,000)
    23         (19)  S.R.0940 over Tobyhanna Creek,
    24             Tobyhanna Township, Bridge Replacement      1,240,000
    25             (Base Construction Allocation -
    26             $1,100,000)
    27             (Land Allocation - $60,000)
    28             (Design and Contingencies - $80,000)
    29         (20)  S.R.0191 over McMichaels Creek,
    30             Stroudsburg Borough, Bridge
    19920S1746B2236                 - 152 -

     1             Replacement                                   520,000
     2             (Base Construction Allocation -
     3             $472,000)
     4             (Design and Contingencies - $48,000)
     5         (21)  S.R.0191 under Railroad, Pocono
     6             Township, Bridge Replacement                1,400,000
     7             (Base Construction Allocation -
     8             $1,000,000)
     9             (Land Allocation - $200,000)
    10             (Design and Contingencies - $200,000)
    11         (22)  S.R.0209 over I-80, Smithfield
    12             Township, Bridge Replacement                  368,000
    13             (Base Construction Allocation -
    14             $334,000)
    15             (Design and Contingencies - $34,000)
    16         (23)  S.R.8024 at I-80 Ramp, Smithfield
    17             Township, Bridge Replacement                  759,000
    18             (Base Construction Allocation -
    19             $690,000)
    20             (Design and Contingencies - $69,000)
    21         (24)  S.R.1005 over Buffalo Run, Stroud
    22             Township, Bridge Replacement                  103,000
    23             (Base Construction Allocation -
    24             $90,000)
    25             (Land Allocation - $4,000)
    26             (Design and Contingencies - $9,000)
    27         (25)  S.R.0191 over Broadhead Creek, Stroud
    28             Township, Bridge Replacement                  843,000
    29             (Base Construction Allocation -
    30             $648,000)
    19920S1746B2236                 - 153 -

     1             (Land Allocation - $65,000)
     2             (Design and Contingencies - $130,000)
     3         (26)  S.R.3022 over McMichael Creek,
     4             Hamilton Township, Bridge Replacement         161,000
     5             (Base Construction Allocation -
     6             $140,000)
     7             (Land Allocation - $7,000)
     8             (Design and Contingencies - $14,000)
     9  Section 50.  Montgomery County.
    10     (a)  Local Bridges
    11         (1)  Cheltenham Township, Mill Road Bridge
    12             over Tookany Creek between Church Road
    13             and Harrison Avenue, Elkins Park,
    14             Bridge Replacement                            360,000
    15             (Base Construction Allocation -
    16             $300,000)
    17             (Land Allocation - $15,000)
    18             (Design and Contingencies - $45,000)
    19         (2)  Cheltenham Township, Forest Avenue
    20             Bridge over Tookany Creek at the
    21             Intersection of Forest Avenue and
    22             Shoemaker Road, Elkins Park, Bridge
    23             Replacement                                   285,000
    24             (Base Construction Allocation -
    25             $250,000)
    26             (Design and Contingencies - $35,000)
    27         (3)  Cheltenham Township, Serpentine Lane
    28             Bridge over Rock Lane Creek between
    29             Rock Lane and Ivy Lane, Elkins Park,
    30             Bridge Replacement                            230,000
    19920S1746B2236                 - 154 -

     1             (Base Construction Allocation -
     2             $200,000)
     3             (Design and Contingencies - $30,000)
     4         (4)  Cheltenham Township, Tookany Creek
     5             Parkway Bridge over Tookany Creek 500
     6             feet East of New Second Street, Elkins
     7             Park, Bridge Replacement                      345,000
     8             (Base Construction Allocation -
     9             $300,000)
    10             (Design and Contingencies - $45,000)
    11         (5)  Cheltenham Township, Ashmead Road
    12             Bridge over Tookany Creek 100 feet
    13             South of Tookany Creek Parkway,
    14             Cheltenham, Bridge Replacement                400,000
    15             (Base Construction Allocation -
    16             $350,000)
    17             (Design and Contingencies - $50,000)
    18         (6)  Trappe Borough and Perkiomen Township,
    19             Betcher Road Bridge over Branch of
    20             School House Run, Bridge Replacement           73,000
    21             (Base Construction Allocation -
    22             $66,000)
    23             (Design and Contingencies - $7,000)
    24         (7)  Trappe Borough, West First Avenue
    25             Bridge over Donny Brook Creek, Bridge
    26             Replacement                                    49,000
    27             (Base Construction Allocation -
    28             $44,000)
    29             (Design and Contingencies - $5,000)
    30         (8)  Abington Township, Revelation Road,
    19920S1746B2236                 - 155 -

     1             Bridge Replacement                            600,000
     2             (Base Construction Allocation -
     3             $400,000)
     4             (Land Allocation - $100,000)
     5             (Design and Contingencies - $100,000)
     6         (9)  Abington Township, Osceola Avenue,
     7             Bridge Replacement                            300,000
     8             (Base Construction Allocation -
     9             $200,000)
    10             (Land Allocation - $50,000)
    11             (Design and Contingencies - $50,000)
    12         (10)  Abington Township, Cadwalader Avenue,
    13             Bridge Replacement                            300,000
    14             (Base Construction Allocation -
    15             $200,000)
    16             (Land Allocation - $50,000)
    17             (Design and Contingencies - $50,000)
    18         (11)  Abington Township, Tulpehocken
    19             Avenue, Bridge Replacement                    300,000
    20             (Base Construction Allocation -
    21             $200,000)
    22             (Land Allocation - $50,000)
    23             (Design and Contingencies - $50,000)
    24         (12)  Abington Township, Rydal Road at
    25             Cloverly Lane, Bridge Replacement             300,000
    26             (Base Construction Allocation -
    27             $200,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $50,000)
    30         (13)  Abington Township, Meadowbrook Road
    19920S1746B2236                 - 156 -

     1             between Stocton Road and Valley Road,
     2             Bridge Replacement                            425,000
     3             (Base Construction Allocation -
     4             $300,000)
     5             (Land Allocation - $50,000)
     6             (Design and Contingencies - $75,000)
     7         (14)  Abington Township, Stocton Road at
     8             Meadowbrook Road, Bridge Replacement          350,000
     9             (Base Construction Allocation -
    10             $250,000)
    11             (Land Allocation - $50,000)
    12             (Design and Contingencies - $50,000)
    13         (15)  Abington Township, Paul Brook Lane,
    14             Bridge Replacement                            350,000
    15             (Base Construction Allocation -
    16             $250,000)
    17             (Land Allocation - $50,000)
    18             (Design and Contingencies - $50,000)
    19         (16)  Abington Township, Johnston Avenue at
    20             Radcliffe Avenue, Bridge Replacement          550,000
    21             (Base Construction Allocation -
    22             $400,000)
    23             (Land Allocation - $50,000)
    24             (Design and Contingencies - $100,000)
    25         (17)  Abington Township, Washington Lane,
    26             300 feet South of Frog Hollow Road,
    27             Bridge Replacement                          2,700,000
    28             (Base Construction Allocation -
    29             $2,000,000)
    30             (Land Allocation - $200,000)
    19920S1746B2236                 - 157 -

     1             (Design and Contingencies - $500,000)
     2         (18)  Abington Township, L.R.46115, Station
     3             50-98, North Hills Avenue, Bridge
     4             Replacement                                   340,000
     5             (Base Construction Allocation -
     6             $200,000)
     7             (Land Allocation - $100,000)
     8             (Design and Contingencies - $40,000)
     9         (19)  Plymouth Township, Belvoir Road
    10             Bridge over Saw Mill Creek, Bridge
    11             Replacement                                   445,000
    12             (Base Construction Allocation -
    13             $400,000)
    14             (Design and Contingencies - $45,000)
    15     (b)  State Bridges
    16         (1)  S.R.3051, Old Betzwood Bridge over
    17             Schuylkill River, West Norriton and
    18             Upper Merion Townships, Bridge
    19             Replacement                                 5,500,000
    20             (Base Construction Allocation -
    21             $4,800,000)
    22             (Land Allocation - $150,000)
    23             (Design and Contingencies - $550,000)
    24         (2)  S.R.4040, Gilbertsville Road Bridge
    25             over Branch of Minister Creek, Douglass
    26             Township, Bridge Replacement                  215,000
    27             (Base Construction Allocation -
    28             $175,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $20,000)
    19920S1746B2236                 - 158 -

     1         (3)  S.R.3020, Danne Hower Bridge over
     2             Schuylkill River, Upper Merion and
     3             Norristown, Bridge Deck Rehabilitation     11,000,000
     4             (Base Construction Allocation -
     5             $10,450,000)
     6             (Design and Contingencies - $550,000)
     7         (4)  S.R.0100, Pa.100 South of Pa.724 to
     8             Berks County Line, 11 bridges
     9             approximately, Douglass, Upper
    10             Pottsgrove, Pottstown and North
    11             Coventry Townships, Bridge Deck
    12             Rehabilitation                              3,800,000
    13             (Base Construction Allocation -
    14             $3,610,000)
    15             (Design and Contingencies - $190,000)
    16         (5)  S.R.0063, Welsh Road Bridge over
    17             Pennypack Creek, Lower Moreland
    18             Township, Bridge Replacement                  215,000
    19             (Base Construction Allocation -
    20             $175,000)
    21             (Land Allocation - $20,000)
    22             (Design and Contingencies - $20,000)
    23         (6)  S.R.0073, Washington Lane Bridge over
    24             SEPTA, Cheltenham Township, Bridge Deck
    25             Rehabilitation                              2,990,000
    26             (Base Construction Allocation -
    27             $2,840,000)
    28             (Design and Contingencies - $150,000)
    29         (7)  S.R.2034, Edgehill Road and York Road,
    30             Abington Township, Bridge Deck
    19920S1746B2236                 - 159 -

     1             Rehabilitation                                250,000
     2             (Base Construction Allocation -
     3             $237,000)
     4             (Design and Contingencies - $13,000)
     5         (8)  S.R.2025, Central Avenue Bridge over
     6             Tacony Creek, Cheltenham Township,
     7             Bridge Replacement                            650,000
     8             (Base Construction Allocation -
     9             $500,000)
    10             (Land Allocation - $75,000)
    11             (Design and Contingencies - $75,000)
    12         (9)  Meetinghouse Road, Bridge over Branch
    13             of Tacony Creek, Abington Township,
    14             Bridge Replacement                            285,000
    15             (Base Construction Allocation -
    16             $160,000)
    17             (Land Allocation - $100,000)
    18             (Design and Contingencies - $25,000)
    19         (10)  Mill Road Bridge over Meadowbrook
    20             Creek, Abington Township, Bridge
    21             Replacement                                 2,100,000
    22             (Base Construction Allocation -
    23             $1,500,000)
    24             (Land Allocation - $200,000)
    25             (Design and Contingencies - $400,000)
    26  Section 51.  Montour County.
    27     (a)  Local Bridges (Reserved)
    28     (b)  State Bridges
    29         (1)  S.R.3006 Bridge over Branch of Beaver
    30             Run, Liberty Township, Bridge
    19920S1746B2236                 - 160 -

     1             Replacement                                   322,000
     2             (Base Construction Allocation -
     3             $269,000)
     4             (Land Allocation - $30,000)
     5             (Design and Contingencies - $23,000)
     6         (2)  S.R.0054, Danville - Riverside Bridge
     7             over Susquehanna River, Danville
     8             Borough, Bridge Rehabilitation              1,430,000
     9             (Base Construction Allocation -
    10             $1,300,000)
    11             (Design and Contingencies - $130,000)
    12  Section 52. Northampton County.
    13     (a)  Local Bridges
    14         (1)  City of Easton, Market Street, Bridge
    15             Replacement                                    83,000
    16             (Base Construction Allocation -
    17             $72,000)
    18             (Design and Contingencies - $11,000)
    19         (2)  City of Easton, Church Street, Bridge
    20             Replacement                                    28,000
    21             (Base Construction Allocation -
    22             $25,000)
    23             (Design and Contingencies - $3,000)
    24         (3)  Bushkill Township, T-638, Keller Road
    25             over Tributary to Bushkill Creek,
    26             Bridge Replacement                            110,000
    27             (Base Construction Allocation -
    28             $70,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $30,000)
    19920S1746B2236                 - 161 -

     1         (4)  Plainfield Township, T-629, County
     2             Bridge No.207 over Wind Gap Creek,
     3             Bridge Replacement                            150,000
     4             (Base Construction Allocation -
     5             $115,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $25,000)
     8         (5)  City of Easton, Bushkill Drive over
     9             Bushkill Creek, Bridge Replacement            530,000
    10             (Base Construction Allocation -
    11             $450,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $70,000)
    14         (6)  Allen Township, T-465B, Atlas Road
    15             over Dry Run Creek, Bridge Replacement        145,000
    16             (Base Construction Allocation -
    17             $110,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $25,000)
    20         (7)  Upper Mount Bethel Township, T-701,
    21             County Bridge No.221 over Jacoby Creek,
    22             Bridge Replacement                            145,000
    23             (Base Construction Allocation -
    24             $110,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $25,000)
    27         (8)  Lower Mount Bethel Township, T-663,
    28             County Bridge No.202 over Oughoughton
    29             Creek, Bridge Replacement                     180,000
    30             (Base Construction Allocation -
    19920S1746B2236                 - 162 -

     1             $140,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $30,000)
     4         (9)  Moore Township, T-588, County Bridge
     5             No.146 over Hokendaqua Creek, Bridge
     6             Replacement                                   175,000
     7             (Base Construction Allocation -
     8             $135,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $30,000)
    11         (10)  Lower Nazareth Township, T-436,
    12             County Bridge No.102 over Monocacy
    13             Creek, Bridge Replacement                     300,000
    14             (Base Construction Allocation -
    15             $250,000)
    16             (Land Allocation - $15,000)
    17             (Design and Contingencies - $35,000)
    18         (11)  Freemansburg Borough, Church Street
    19             Bridge over Conrail, Bridge
    20             Replacement                                   190,000
    21             (Base Construction Allocation -
    22             $165,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $15,000)
    25         (12)  Freemansburg Borough, Market Street
    26             Bridge over Conrail, Bridge
    27             Replacement                                   190,000
    28             (Base Construction Allocation -
    29             $165,000)
    30             (Land Allocation - $10,000)
    19920S1746B2236                 - 163 -

     1             (Design and Contingencies - $15,000)
     2         (13)  City of Bethlehem, Lynn Avenue Bridge
     3             between S.R.0412 and East 6th Street,
     4             Bridge Replacement                          1,857,000
     5             (Base Construction Allocation -
     6             $1,572,000)
     7             (Land Allocation - $15,000)
     8             (Design and Contingencies - $270,000)
     9     (b) State Bridges
    10         (1)  S.R.0611 Front Street over Bushkill
    11             Creek, City of Easton, Bridge
    12             Replacement                                 1,139,000
    13             (Base Construction Allocation -
    14             $1,035,000)
    15             (Design and Contingencies - $104,000)
    16         (2)  S.R.3020 over East Branch of the
    17             Monocacy Creek, Upper Nazareth
    18             Township, Bridge Replacement                  227,000
    19             (Base Construction Allocation -
    20             $174,000)
    21             (Land Allocation - $35,000)
    22             (Design and Contingencies - $18,000)
    23         (3)  S.R.3020 over Tributary to Monocacy
    24             Creek near Georgetown Road, Lower
    25             Nazareth Township, Bridge Replacement         271,000
    26             (Base Construction Allocation -
    27             $208,000)
    28             (Land Allocation - $42,000)
    29             (Design and Contingencies - $21,000)
    30         (4)  S.R.1012 over Bushkill Creek, Bushkill
    19920S1746B2236                 - 164 -

     1             Township, Bridge Replacement                  222,000
     2             (Base Construction Allocation -
     3             $201,000)
     4             (Design and Contingencies - $21,000)
     5         (5)  S.R.2017 13th Street over S.R.0022,
     6             City of Easton Bridge Replacement             465,000
     7             (Base Construction Allocation -
     8             $422,000)
     9             (Design and Contingencies - $43,000)
    10         (6)  S.R.4006 Whitetail Deer Drive over
    11             West Branch of Monocacy Creek, Moore
    12             Township, Bridge Replacement                  169,000
    13             (Base Construction Allocation -
    14             $130,000)
    15             (Land Allocation - $26,000)
    16             (Design and Contingencies - $13,000)
    17         (7)  S.R.0329 over Limestone Quarry, Allen
    18             Township, Bridge Replacement                  464,000
    19             (Base Construction Allocation -
    20             $356,000)
    21             (Land Allocation - $72,000)
    22             (Design and Contingencies - $36,000)
    23         (8)  S.R.0329 over Dry Run, Allen Township,
    24             Bridge Replacement                            146,000
    25             (Base Construction Allocation -
    26             $111,000)
    27             (Land Allocation - $23,000)
    28             (Design and Contingencies - $12,000)
    29         (9)  S.R.0329 over Hokendaqua Creek,
    30             Northampton Borough, Bridge
    19920S1746B2236                 - 165 -

     1             Replacement                                   812,000
     2             (Base Construction Allocation -
     3             $624,000)
     4             (Land Allocation - $125,000)
     5             (Design and Contingencies - $63,000)
     6  Section 53.  Northumberland County.
     7     (a)  Local Bridges
     8         (1)  West Cameron Township, T-480, County
     9             Bridge No.167 over Mahanoy Creek,
    10             Bridge Replacement                            815,000
    11             (Base Construction Allocation -
    12             $652,000)
    13             (Design and Contingencies - $163,000)
    14         (2)  Mount Carmel Borough, North Vine
    15             Street Bridge over Shamokin Creek,
    16             Bridge Rehabilitation                         320,000
    17             (Base Construction Allocation -
    18             $240,000)
    19             (Design and Contingencies - $80,000)
    20         (3)  Milton Borough, Brown Avenue Bridge
    21             over Limestone Run, Bridge Replacement        400,000
    22             (Base Construction Allocation -
    23             $320,000)
    24             (Design and Contingencies - $80,000)
    25         (4)  Milton Borough, Filbert Street Bridge
    26             over Limestone Run, Bridge Replacement        650,000
    27             (Base Construction Allocation -
    28             $500,000)
    29             (Design and Contingencies - $150,000)
    30     (b)  State Bridges
    19920S1746B2236                 - 166 -

     1         (1)  S.R.3012, Fiddlers Run Bridge over
     2             Fiddlers Run, Jackson and Lower Mahanoy
     3             Townships Bridge Replacement                  407,000
     4             (Base Construction Allocation -
     5             $326,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $61,000)
     8         (2)  S.R.2016 Bridge over Shamokin Creek,
     9             Shamokin Township, Bridge Replacement         789,000
    10             (Base Construction Allocation -
    11             $631,000)
    12             (Land Allocation - $39,000)
    13             (Design and Contingencies - $119,000)
    14         (3)  S.R.2017 Bridge over Coal Run, Coal
    15             Township, Bridge Replacement                  436,000
    16             (Base Construction Allocation -
    17             $349,000)
    18             (Land Allocation - $22,000)
    19             (Design and Contingencies - $65,000)
    20  Section 54.  Perry County.
    21     (a)  Local Bridges (Reserved)
    22     (b)  State Bridges
    23         (1)  S.R.50014, Delville Road Bridge over
    24             Sherman Creek, Penn Township, Bridge
    25             Replacement                                 1,250,000
    26             (Base Construction Allocation -
    27             $1,079,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $161,000)
    30         (2)  S.R.50014, Delville Road Bridge over
    19920S1746B2236                 - 167 -

     1             Sherman Creek, Penn and Wheatfield
     2             Townships, Bridge Replacement               1,272,000
     3             (Base Construction Allocation -
     4             $1,099,000)
     5             (Land Allocation - $8,000)
     6             (Design and Contingencies - $165,000)
     7         (3)  S.R.3009, Shermans Creek Bridge over
     8             Shermans Creek, Southwest Madison
     9             Township, Bridge Replacement                  730,000
    10             (Base Construction Allocation -
    11             $610,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $100,000)
    14  Section 55.  Philadelphia County.
    15     (a)  Local Bridges (Reserved)
    16     (b)  State Bridges
    17         (1)  S.R.1002, Adams Avenue Bridge over
    18             Tacony Creek, City of Philadelphia,
    19             Bridge Rehabilitation                       1,200,000
    20             (Base Construction Allocation -
    21             $850,000)
    22             (Land Allocation - $100,000)
    23             (Design and Contingencies - $250,000)
    24         (2)  S.R.4006, City Avenue S.B. over
    25             Schuylkill, City of Philadelphia,
    26             Bridge Deck Replacement                     7,950,000
    27             (Base Construction Allocation -
    28             $7,500,000)
    29             (Land Allocation - $100,000)
    30             (Design and Contingencies - $350,000)
    19920S1746B2236                 - 168 -

     1         (3)  S.R.0063, Woodhaven Road: U.S. 1 to I-
     2             95, 6 bridges, Philadelphia and
     3             Bensalem Townships, Bridge Deck
     4             Rehabilitation                              3,500,000
     5             (Base Construction Allocation -
     6             $3,325,000)
     7             (Design and Contingencies - $175,000)
     8  Section 56. Pike County.
     9     (a)  Local Bridges
    10         (1)  Milford Borough and Dingman Township,
    11             T-426, Mott Street Bridge No.21 over
    12             Sawkill Creek, Bridge Replacement           1,550,000
    13             (Base Construction Allocation -
    14             $1,310,000)
    15             (Land Allocation - $40,000)
    16             (Design and Contingencies - $200,000)
    17         (2)  Shohola Township, T-440, Aumuller
    18             Bridge No.24 over Balliard Creek,
    19             Bridge Replacement                            210,000
    20             (Base Construction Allocation -
    21             $165,000)
    22             (Land Allocation - $20,000)
    23             (Design and Contingencies - $25,000)
    24         (3)  Porter Township, T-317, Bridge No.5
    25             over Big Bushkill Creek, Bridge
    26             Replacement                                   450,000
    27             (Base Construction Allocation -
    28             $370,000)
    29             (Land Allocation - $25,000)
    30             (Design and Contingencies - $55,000)
    19920S1746B2236                 - 169 -

     1         (4)  Porter Township, T-317, Bridge No.4
     2             over Spruce Run, Bridge Replacement           135,000
     3             (Base Construction Allocation -
     4             $100,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $15,000)
     7         (5)  Dingman Township, T-424, Bridge No.5
     8             Rattlesnake Bridge over Rattlesnake
     9             Creek, Bridge Replacement                     210,000
    10             (Base Construction Allocation -
    11             $165,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $25,000)
    14     (b) State Bridges
    15         (1)  S.R.0006 Bridge over Delaware River,
    16             Matamoras Borough, Bridge Replacement         330,000
    17             (Base Construction Allocation -
    18             $300,000)
    19             (Design and Contingencies - $30,000)
    20         (2)  S.R.0084 Bridge over Delaware River,
    21             Matamoras Borough, Bridge Replacement         700,000
    22             (Base Construction Allocation -
    23             $600,000)
    24             (Design and Contingencies - $100,000)
    25         (3)  S.R.0402 Bridge over Blooming Grove
    26             Creek, Blooming Grove Township, Bridge
    27             Replacement                                   460,000
    28             (Base Construction Allocation -
    29             $400,000)
    30             (Land Allocation - $10,000)
    19920S1746B2236                 - 170 -

     1             (Design and Contingencies - $50,000)
     2         (4)  S.R.2001 Bridge over Toms Creek,
     3             Lehman Township, Bridge Replacement           536,000
     4             (Base Construction Allocation -
     5             $470,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $56,000)
     8         (5)  S.R.2001 Bridge over Branch of
     9             Valentine Brook, Milford Borough,
    10             Bridge Replacement                            570,000
    11             (Base Construction Allocation -
    12             $500,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $60,000)
    15         (6)  S.R.0507 Bridge over Tributary to
    16             Wallenpaupack Creek, Palmyra Township,
    17             Bridge Replacement                            460,000
    18             (Base Construction Allocation -
    19             $400,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $50,000)
    22         (7)  S.R.0209 Bridge over Sawskill Creek,
    23             Milford Borough, Bridge Replacement         2,280,000
    24             (Base Construction Allocation -
    25             $2,020,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $240,000)
    28  Section 57.  Potter County.
    29     (a)  Local Bridges (Reserved)
    30     (b)  State Bridges
    19920S1746B2236                 - 171 -

     1         (1)  S.R.0044, Kettle Creek Bridge over
     2             Kettle Creek, Stewardson Township,
     3             Bridge Replacement                          1,150,000
     4             (Base Construction Allocation -
     5             $900,000)
     6             (Land Allocation - $100,000)
     7             (Design and Contingencies - $150,000)
     8         (2)  S.R.0044 Bridge over Kettle Creek,
     9             Stewardson Township, Bridge
    10             Replacement                                 1,150,000
    11             (Base Construction Allocation -
    12             $900,000)
    13             (Land Allocation - $100,000)
    14             (Design and Contingencies - $150,000)
    15         (3)  S.R.0006 Bridge over Allegheny River,
    16             Coudersport Borough, Bridge
    17             Replacement                                 1,500,000
    18             (Base Construction Allocation -
    19             $1,250,000)
    20             (Land Allocation - $100,000)
    21             (Design and Contingencies - $150,000)
    22         (4)  S.R.0044 Bridge over Sharon Creek,
    23             Sharon Township, Bridge Replacement           800,000
    24             (Base Construction Allocation -
    25             $600,000)
    26             (Land Allocation - $100,000)
    27             (Design and Contingencies - $100,000)
    28         (5)  S.R.0244 Bridge over Ellisburg Creek,
    29             Genesee Township, Bridge Replacement          650,000
    30             (Base Construction Allocation -
    19920S1746B2236                 - 172 -

     1             $450,000)
     2             (Land Allocation - $100,000)
     3             (Design and Contingencies - $100,000)
     4         (6)  S.R.1010 Bridge over Genesee River,
     5             Genesee Township, Bridge Replacement        1,600,000
     6             (Base Construction Allocation -
     7             $1,250,000)
     8             (Land Allocation - $150,000)
     9             (Design and Contingencies - $200,000)
    10         (7)  S.R.1011, Bridge No.2 over Genesee
    11             River, Genesee Township, Bridge
    12             Replacement                                   850,000
    13             (Base Construction Allocation -
    14             $650,000)
    15             (Land Allocation - $100,000)
    16             (Design and Contingencies - $100,000)
    17         (8)  S.R.1020 Bridge over West Branch of
    18             Pine Creek, Galeton Borough, Bridge
    19             Replacement                                 1,525,000
    20             (Base Construction Allocation -
    21             $1,250,000)
    22             (Land Allocation - $100,000)
    23             (Design and Contingencies - $175,000)
    24         (9)  S.R.1024 Bridge over Pine Creek,
    25             Ulysses Township, Bridge Replacement          450,000
    26             (Base Construction Allocation -
    27             $250,000)
    28             (Land Allocation - $100,000)
    29             (Design and Contingencies - $100,000)
    30         (10)  S.R.1024 Bridge over Genesee Fork of
    19920S1746B2236                 - 173 -

     1             Pine Creek, Ulysses Township, Bridge
     2             Replacement                                 1,300,000
     3             (Base Construction Allocation -
     4             $1,000,000)
     5             (Land Allocation - $150,000)
     6             (Design and Contingencies - $150,000)
     7         (11)  S.R.4003 Bridge over Fishing Creek,
     8             Roulette Township, Bridge Replacement         950,000
     9             (Base Construction Allocation -
    10             $750,000)
    11             (Land Allocation - $100,000)
    12             (Design and Contingencies - $100,000)
    13  Section 58. Schuylkill County.
    14     (a)  Local Bridges
    15         (1)  North Union Township, T-455 over
    16             Tomhicken Creek, Bridge Replacement           178,000
    17             (Base Construction Allocation -
    18             $138,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $30,000)
    21         (2)  Union Township, T-794 over Little
    22             Catawissa Creek, Bridge Replacement           180,000
    23             (Base Construction Allocation -
    24             $140,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $30,000)
    27         (3)  Branch Township, T-564, Diamond Street
    28             over West Creek, Bridge Replacement           190,000
    29             (Base Construction Allocation -
    30             $150,000)
    19920S1746B2236                 - 174 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $30,000)
     3         (4)  East Brunswick Township, T-757 over
     4             Indian Run, Bridge Replacement                155,000
     5             (Base Construction Allocation -
     6             $115,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $30,000)
     9         (5)  Hegins Township, T-388, Wood Lane
    10             Bridge over Deep Creek, Bridge
    11             Replacement                                   220,000
    12             (Base Construction Allocation -
    13             $175,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $35,000)
    16         (6)  Barry Township, T-577, County Bridge
    17             No.7 over Deep Creek, Bridge
    18             Replacement                                   155,000
    19             (Base Construction Allocation -
    20             $115,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $30,000)
    23         (7)  Porter Township, T-418, County Bridge
    24             No.67 over Wisconisco Creek, Bridge
    25             Replacement                                   235,000
    26             (Base Construction Allocation -
    27             $180,000)
    28             (Land Allocation - $15,000)
    29             (Design and Contingencies - $40,000)
    30         (8)  Pine Grove Township, T-406, County
    19920S1746B2236                 - 175 -

     1             Bridge No.108 over Little Swatara
     2             Creek, Bridge Replacement                     395,000
     3             (Base Construction Allocation -
     4             $325,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $50,000)
     7         (9)  West Brunswick Township, T-723,
     8             Industrial Park Road Bridge over Pine
     9             Creek, Bridge Replacement                     420,000
    10             (Base Construction Allocation -
    11             $350,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $50,000)
    14         (10)  Hegins Township, T-474, Gap School
    15             Road Bridge over Rausch Creek, Bridge
    16             Replacement                                   150,000
    17             (Base Construction Allocation -
    18             $110,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $30,000)
    21         (11)  Hegins Township, T-474, Gap School
    22             Road Bridge over Pine Creek, Bridge
    23             Replacement                                   185,000
    24             (Base Construction Allocation -
    25             $145,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $30,000)
    28         (12)  Hubley Township, T-446, County Bridge
    29             No.71 over Deep Creek, Bridge
    30             Replacement                                   400,000
    19920S1746B2236                 - 176 -

     1             (Base Construction Allocation -
     2             $330,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $50,000)
     5         (13)  Girardville Borough, John Street
     6             Bridge over Mahanoy Creek, Bridge
     7             Replacement                                   245,000
     8             (Base Construction Allocation -
     9             $200,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $35,000)
    12         (14)  St. Clair Borough, Sherman Street
    13             County Bridge No.48 over Mill Creek,
    14             Bridge Replacement                            300,000
    15             (Base Construction Allocation -
    16             $240,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $40,000)
    19         (15)  Pine Grove Borough, Mill Street
    20             County Bridge No.33 over Swatara Creek,
    21             Bridge Replacement                            725,000
    22             (Base Construction Allocation -
    23             $630,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $75,000)
    26         (16)  St. Clair Borough, Russell Street
    27             Bridge over Mill Creek, Bridge
    28             Replacement                                   260,000
    29             (Base Construction Allocation -
    30             $200,000)
    19920S1746B2236                 - 177 -

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $40,000)
     3         (17)  Gilberton Borough, Railroad Street
     4             Bridge over Mahanoy Creek, Bridge
     5             Replacement                                   190,000
     6             (Base Construction Allocation -
     7             $150,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $30,000)
    10         (18)  Gilberton Borough, Bridge Street
    11             County Bridge No.78 over Mahanoy Creek,
    12             Bridge Replacement                            245,000
    13             (Base Construction Allocation -
    14             $200,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $35,000)
    17         (19)  Landingville Borough, Canal Street
    18             Bridge over Schuylkill River, Bridge
    19             Replacement                                   740,000
    20             (Base Construction Allocation -
    21             $640,000)
    22             (Land Allocation - $20,000)
    23             (Design and Contingencies - $80,000)
    24         (20)  Blythe Township, T-770, Ridge Street
    25             Bridge over Schuylkill River, Bridge
    26             Replacement                                   450,000
    27             (Base Construction Allocation -
    28             $380,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $50,000)
    19920S1746B2236                 - 178 -

     1         (21)  North Manheim Township, T-686,
     2             Memorial Drive under abandoned railroad
     3             line, Bridge Removal                          295,000
     4             (Base Construction Allocation -
     5             $250,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $25,000)
     8         (22)  Frackville Borough, Spring Street
     9             overpass, under Reading Railroad,
    10             Bridge Removal                                 72,000
    11             (Base Construction Allocation -
    12             $52,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $10,000)
    15         (23)  Hegins Township, T-478, Bridge over
    16             Pine Creek, Bridge Replacement                148,000
    17             (Base Construction Allocation -
    18             $129,000)
    19             (Land Allocation - $6,000)
    20             (Design and Contingencies - $13,000)
    21     (b)  State Bridges
    22         (1)  S.R.0309 Center Street over Little
    23             Schuylkill River, Tamaqua Borough,
    24             Bridge Replacement                          1,253,000
    25             (Base Construction Allocation -
    26             $963,000)
    27             (Land Allocation - $193,000)
    28             (Design and Contingencies - $97,000)
    29         (2)  S.R.0061 over Schuylkill River, City
    30             of Pottsville, Bridge Replacement             329,000
    19920S1746B2236                 - 179 -

     1             (Base Construction Allocation -
     2             $299,000)
     3             (Design and Contingencies - $30,000)
     4         (3)  S.R.0061 over Railroad near City of
     5             Pottsville, Bridge Replacement              1,323,000
     6             (Base Construction Allocation -
     7             $1,202,000)
     8             (Design and Contingencies - $121,000)
     9         (4)  S.R.0895 over Bear Creek, Wayne
    10             Township, Bridge Replacement                  169,000
    11             (Base Construction Allocation -
    12             $130,000)
    13             (Land Allocation - $26,000)
    14             (Design and Contingencies - $13,000)
    15         (5)  S.R.4042 over West Branch of
    16             Schuylkill River, Minersville Borough,
    17             Bridge Replacement                            468,000
    18             (Base Construction Allocation -
    19             $360,000)
    20             (Land Allocation - $72,000)
    21             (Design and Contingencies - $36,000)
    22         (6)  S.R.4002 over West Branch of
    23             Schuylkill River, Cass Township, Bridge
    24             Replacement                                   296,000
    25             (Base Construction Allocation -
    26             $269,000)
    27             (Design and Contingencies - $27,000)
    28         (7)  S.R.0501 over Branch of Little Swatara
    29             Creek, Pine Grove Township, Bridge
    30             Replacement                                   130,000
    19920S1746B2236                 - 180 -

     1             (Base Construction Allocation -
     2             $100,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $10,000)
     5         (8)  S.R.1002 Pottsville Street over Mill
     6             Creek, Port Carbon Borough, Bridge
     7             Replacement                                   603,000
     8             (Base Construction Allocation -
     9             $548,000)
    10             (Design and Contingencies - $55,000)
    11         (9)  S.R.0209 over a mine shaft near
    12             Mechanicsville Borough, Port Carbon
    13             Borough, Bridge Replacement                    48,000
    14             (Base Construction Allocation -
    15             $40,000)
    16             (Design and Contingencies - $8,000)
    17         (10)  S.R.0924 overpass under Reading
    18             Railroad, Frackville Borough, Bridge
    19             Removal                                       120,000
    20             (Base Construction Allocation -
    21             $100,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $10,000)
    24         (11)  S.R.2006 over Mahannon Creek, West
    25             Brunswick Township, Bridge Removal            107,000
    26             (Base Construction Allocation -
    27             $92,000)
    28             (Land Allocation - $5,000)
    29             (Design and Contingencies - $10,000)
    30  Section 59.  Snyder County.
    19920S1746B2236                 - 181 -

     1     (a)  Local Bridges (Reserved)
     2     (b)  State Bridges
     3         (1)  S.R.1017 Bridge over Rolling Green
     4             Run, Monroe Township, Bridge
     5             Replacement                                   395,000
     6             (Base Construction Allocation -
     7             $316,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $59,000)
    10  Section 60.  Somerset County.
    11     (a)  Local Bridges
    12         (1)  Elk Lick Township, Moser Bridge,
    13             Bridge Replacement                            759,000
    14             (Base Construction Allocation -
    15             $694,000)
    16             (Land Allocation - $5,000)
    17             (Design and Contingencies - $60,000)
    18         (2)  Allegheny Township, Brush Creek
    19             Bridge, Bridge Replacement                    306,000
    20             (Base Construction Allocation -
    21             $268,000)
    22             (Land Allocation - $5,000)
    23             (Design and Contingencies - $33,000)
    24         (3)  Elk Lick Township, Maust Bridge,
    25             Bridge Replacement                            866,000
    26             (Base Construction Allocation -
    27             $794,000)
    28             (Land Allocation - $5,000)
    29             (Design and Contingencies - $67,000)
    30         (4)  Fairhope Township, Pack Saddle Bridge,
    19920S1746B2236                 - 182 -

     1             Bridge Replacement                            228,000
     2             (Base Construction Allocation -
     3             $200,000)
     4             (Land Allocation - $5,000)
     5             (Design and Contingencies - $23,000)
     6         (5)  Southampton Township, Emerick Bridge,
     7             Bridge Replacement                            265,000
     8             (Base Construction Allocation -
     9             $230,000)
    10             (Land Allocation - $5,000)
    11             (Design and Contingencies - $30,000)
    12         (6)  Stonycreek Township, Brady Bridge,
    13             Bridge Replacement                            601,000
    14             (Base Construction Allocation -
    15             $546,000)
    16             (Land Allocation - $5,000)
    17             (Design and Contingencies - $50,000)
    18         (7)  Northampton Township, Philson Bridge,
    19             Bridge Replacement                            367,000
    20             (Base Construction Allocation -
    21             $325,000)
    22             (Land Allocation - $5,000)
    23             (Design and Contingencies - $37,000)
    24         (8)  Somerset Township, Housefeldt Bridge,
    25             Bridge Replacement                            366,000
    26             (Base Construction Allocation -
    27             $325,000)
    28             (Land Allocation - $5,000)
    29             (Design and Contingencies - $36,000)
    30     (b)  State Bridges
    19920S1746B2236                 - 183 -

     1         (1)  S.R.0219, Miller Run Bridge No.2,
     2             Brothers Valley Township, Bridge
     3             Replacement                                   560,000
     4             (Base Construction Allocation -
     5             $465,000)
     6             (Land Allocation - $25,000)
     7             (Design and Contingencies - $70,000)
     8         (2)  S.R.2005, Intersection Bridge over Elk
     9             Lick Creek, Somerset Township, Bridge
    10             Replacement                                   558,000
    11             (Base Construction Allocation -
    12             $442,000)
    13             (Land Allocation - $50,000)
    14             (Design and Contingencies - $66,000)
    15         (3)  S.R.1004, East Shanksville Bridge over
    16             Rhoades Creek, Shanksville Borough,
    17             Bridge Replacement                            992,000
    18             (Base Construction Allocation -
    19             $789,000)
    20             (Land Allocation - $100,000)
    21             (Design and Contingencies - $103,000)
    22         (4)  S.R.0281, Southwest Somerset Bridge
    23             over West Branch Coxes Creek, Somerset
    24             Township, Bridge Replacement                  678,000
    25             (Base Construction Allocation -
    26             $556,000)
    27             (Land Allocation - $50,000)
    28             (Design and Contingencies - $72,000)
    29         (5)  S.R.0031, East Brotherton Bridge over
    30             Sandy Hallow Creek, Stoneycreek
    19920S1746B2236                 - 184 -

     1             Township, Bridge Replacement                  535,000
     2             (Base Construction Allocation -
     3             $445,000)
     4             (Land Allocation - $25,000)
     5             (Design and Contingencies - $65,000)
     6         (6)  S.R.0219, Miller Run Bridge No.1,
     7             Brothers Valley Township, Bridge
     8             Replacement                                   560,000
     9             (Base Construction Allocation -
    10             $465,000)
    11             (Land Allocation - $25,000)
    12             (Design and Contingencies - $70,000)
    13         (7)  S.R.0031, Kimberly Run Bridge,
    14             Somerset Township, Bridge Replacement         525,000
    15             (Base Construction Allocation -
    16             $435,000)
    17             (Land Allocation - $25,000)
    18             (Design and Contingencies - $65,000)
    19         (8)  S.R.2021, Burkhart Bridge over
    20             Shaffers Run, Fairhope Township, Bridge
    21             Replacement                                   675,000
    22             (Base Construction Allocation -
    23             $553,000)
    24             (Land Allocation - $50,000)
    25             (Design and Contingencies - $72,000)
    26         (9)  S.R.2021, Midway Bridge over Shaffers
    27             Run, Fairhope Township, Bridge
    28             Replacement                                   560,000
    29             (Base Construction Allocation -
    30             $444,000)
    19920S1746B2236                 - 185 -

     1             (Land Allocation - $50,000)
     2             (Design and Contingencies - $66,000)
     3         (10)  S.R.4041, Krings Bridge over
     4             Stonycreek River, Conemaugh Township,
     5             Bridge Replacement                          2,496,000
     6             (Base Construction Allocation -
     7             $2,087,000)
     8             (Land Allocation - $200,000)
     9             (Design and Contingencies - $209,000)
    10  Section 61.  Sullivan County (Reserved).
    11  Section 62.  Susquehanna County.
    12     (a)  Local Bridges (Reserved)
    13     (b)  State Bridges
    14         (1)  S.R.0374 over Tunkhannock Creek,
    15             Clifford Township, Bridge Replacement         350,000
    16             (Base Construction Allocation -
    17             $300,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $40,000)
    20         (2)  S.R.2021 over Tunkhannock Creek,
    21             Lenoxville Borough, Bridge Replacement        800,000
    22             (Base Construction Allocation -
    23             $700,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $90,000)
    26         (3)  S.R.2021 over Tunkhannock Creek, Lenox
    27             Township, Bridge Replacement                1,470,000
    28             (Base Construction Allocation -
    29             $1,300,000)
    30             (Land Allocation - $10,000)
    19920S1746B2236                 - 186 -

     1             (Design and Contingencies - $160,000)
     2         (4)  S.R.0267 over East Branch of Wyalusing
     3             Creek, Rush Township, Bridge
     4             Replacement                                 1,250,000
     5             (Base Construction Allocation -
     6             $1,107,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $133,000)
     9         (5)  S.R.0106 over East Branch of
    10             Tunkhannock Creek, Clifford Township,
    11             Bridge Replacement                          1,018,000
    12             (Base Construction Allocation -
    13             $900,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $108,000)
    16         (6)  S.R.0171 over East Branch of
    17             Lackawanna River, Clifford Township,
    18             Bridge Replacement                          2,938,000
    19             (Base Construction Allocation -
    20             $2,605,000)
    21             (Land Allocation - $20,000)
    22             (Design and Contingencies - $313,000)
    23         (7)  S.R.0106 over East Branch of
    24             Tunkhannock Creek, Clifford Township,
    25             Bridge Replacement                          1,870,000
    26             (Base Construction Allocation -
    27             $1,660,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $200,000)
    30         (8)  S.R.0374 over Tunkhannock Creek, Lenox
    19920S1746B2236                 - 187 -

     1             Township, Bridge Replacement                  370,000
     2             (Base Construction Allocation -
     3             $320,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $40,000)
     6         (9)  S.R.3029 over East Branch of Wyalusing
     7             Creek, Jessup Township, Bridge
     8             Replacement                                   794,000
     9             (Base Construction Allocation -
    10             $700,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $84,000)
    13         (10)  S.R.1010 over Lewis Creek, Oakland
    14             Township, Bridge Replacement                  486,000
    15             (Base Construction Allocation -
    16             $425,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $51,000)
    19         (11)  S.R.0858 over Apolacon Creek, Little
    20             Meadows Borough, Bridge Replacement         1,197,000
    21             (Base Construction Allocation -
    22             $1,060,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $127,000)
    25         (12)  S.R.0848 over Branch of Butler Creek,
    26             Gibson Township, Bridge Replacement           532,000
    27             (Base Construction Allocation -
    28             $466,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $56,000)
    19920S1746B2236                 - 188 -

     1         (13)  S.R.2050 over North Branch of
     2             Tunkhannock Creek, Clifford Township,
     3             Bridge Replacement                            553,000
     4             (Base Construction Allocation -
     5             $485,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $58,000)
     8         (14)  S.R.2061 over Meylert Creek, New
     9             Milford Township, Bridge Replacement          380,000
    10             (Base Construction Allocation -
    11             $330,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $40,000)
    14         (15)  S.R.3012 over West Branch of
    15             Meshoppen Creek, Springville Township,
    16             Bridge Replacement                            676,000
    17             (Base Construction Allocation -
    18             $595,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $71,000)
    21         (16)  S.R.2096 over Horton Creek, Lathrop
    22             Township, Bridge Replacement                  458,000
    23             (Base Construction Allocation -
    24             $400,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $48,000)
    27         (17)  S.R.0267 over Branch of Choconut
    28             Creek, Choconut Township, Bridge
    29             Replacement                                   794,000
    30             (Base Construction Allocation -
    19920S1746B2236                 - 189 -

     1             $700,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $84,000)
     4  Section 63.  Tioga County (Reserved).
     5  Section 64.  Union County.
     6     (a)  Local Bridges
     7         (1)  West Buffalo Township, T-380, School
     8             House Bridge over Buffalo Creek, Bridge
     9             Replacement                                   779,000
    10             (Base Construction Allocation -
    11             $623,000)
    12             (Land Allocation - $39,000)
    13             (Design and Contingencies - $117,000)
    14         2)  Kelly Township, T-450, County Bridge
    15             No.8, Nogle Bridge over Buffalo Creek,
    16             Bridge Replacement                          1,026,000
    17             (Base Construction Allocation -
    18             $821,000)
    19             (Land Allocation - $51,000)
    20             (Design and Contingencies - $154,000)
    21         (3)  Mifflinburg Borough, County Bridge
    22             No.14, Iddings Bridge over Buffalo
    23             Creek, Bridge Replacement                     493,000
    24             (Base Construction Allocation -
    25             $394,000)
    26             (Land Allocation - $25,000)
    27             (Design and Contingencies - $74,000)
    28         (4)  Hartley Township, Trails End Bridge
    29             over Penns Creek, Bridge Replacement        1,120,000
    30             (Base Construction Allocation -
    19920S1746B2236                 - 190 -

     1             $896,000)
     2             (Land Allocation - $56,000)
     3             (Design and Contingencies - $168,000)
     4         (5)  White Deer Township, Bowersox Bridge
     5             over Spruce Run, Bridge Replacement           300,000
     6             (Base Construction Allocation -
     7             $240,000)
     8             (Land Allocation - $15,000)
     9             (Design and Contingencies - $45,000)
    10         (6)  Limestone Township, Deer Bridge over
    11             Sweitzer Run, Bridge Replacement              350,000
    12             (Base Construction Allocation -
    13             $280,000)
    14             (Land Allocation - $15,000)
    15             (Design and Contingencies - $55,000)
    16     (b)  State Bridges (Reserved)
    17  Section 65. Venango County.
    18     (a)  Local Bridges
    19         (1)  Cherry Tree Township, T-520 over
    20             Prather Creek, Bridge Replacement             120,000
    21             (Base Construction Allocation -
    22             $96,000)
    23             (Land Allocation - $12,000)
    24             (Design and Contingencies - $12,000)
    25         (2)  Oil Creek Township, T-639 on Coe Road
    26             over Pithole Creek, Bridge Replacement        112,000
    27             (Base Construction Allocation -
    28             $90,000)
    29             (Land Allocation - $11,000)
    30             (Design and Contingencies - $11,000)
    19920S1746B2236                 - 191 -

     1         (3)  Oakland Township, T-450 over Two Mule
     2             Run Tributary, Bridge Replacement             154,000
     3             (Base Construction Allocation -
     4             $124,000)
     5             (Land Allocation - $15,000)
     6             (Design and Contingencies - $15,000)
     7         (4)  Cherry Tree Township, T-649 over
     8             Prather Creek, Bridge Replacement             120,000
     9             (Base Construction Allocation -
    10             $96,000)
    11             (Land Allocation - $12,000)
    12             (Design and Contingencies - $12,000)
    13         (5)  Rockland Township, T-512, Slab Furnace
    14             Railroad over Conrail Railroad, Bridge
    15             Replacement                                   442,000
    16             (Base Construction Allocation -
    17             $384,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $48,000)
    20         (6)  Rockland Township, T-582, Conrail
    21             Bridge T-582 over Conrail Railroad,
    22             Bridge Replacement                            385,000
    23             (Base Construction Allocation -
    24             $345,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $30,000)
    27     (b)  State Bridges
    28         (1)  S.R.3007, Witherup Bridge over
    29             Scrubgrass Creek, Clinton Township,
    30             Bridge Replacement                            850,000
    19920S1746B2236                 - 192 -

     1             (Base Construction Allocation -
     2             $665,000)
     3             (Land Allocation - $60,000)
     4             (Design and Contingencies - $125,000)
     5         (2)  S.R.0036 on Col. Drake Highway over
     6             Pithole Creek, Allegheny Township,
     7             Bridge Replacement                            900,000
     8             (Base Construction Allocation -
     9             $765,000)
    10             (Land Allocation - $45,000)
    11             (Design and Contingencies - $90,000)
    12  Section 66. Warren County.
    13     (a)  Local Bridges
    14         (1)  Pittsfield Township, T-435 over
    15             Andrews Run, Bridge Replacement               192,000
    16             (Base Construction Allocation -
    17             $154,000)
    18             (Land Allocation - $19,000)
    19             (Design and Contingencies - $19,000)
    20         (2)  Freehold Township, T-549 over Stoney
    21             Creek, Bridge Replacement                     110,000
    22             (Base Construction Allocation -
    23             $88,000)
    24             (Land Allocation - $11,000)
    25             (Design and Contingencies - $11,000)
    26         (3)  Sheffield Township, T-540 over Two
    27             Mile Run, Bridge Replacement                  318,000
    28             (Base Construction Allocation -
    29             $254,000)
    30             (Land Allocation - $32,000)
    19920S1746B2236                 - 193 -

     1             (Design and Contingencies - $32,000)
     2         (4)  Southwest Township, T-306 on Mt. Hope
     3             Road over Pine Creek, Bridge
     4             Replacement                                   207,000
     5             (Base Construction Allocation -
     6             $165,000)
     7             (Land Allocation - $21,000)
     8             (Design and Contingencies - $21,000)
     9         (5)  Spring Creek Township, T-322 over East
    10             Branch of Spring Creek, Bridge
    11             Replacement                                   207,000
    12             (Base Construction Allocation -
    13             $165,000)
    14             (Land Allocation - $21,000)
    15             (Design and Contingencies - $21,000)
    16         (6)  Southwest Township, T-313 on Swede
    17             Road over Pine Creek, Bridge
    18             Replacement                                   109,000
    19             (Base Construction Allocation -
    20             $87,000)
    21             (Land Allocation - $11,000)
    22             (Design and Contingencies - $11,000)
    23         (7)  Sheffield Township, T-311 over
    24             Caldwell Creek, Bridge Replacement            210,000
    25             (Base Construction Allocation -
    26             $168,000)
    27             (Land Allocation - $21,000)
    28             (Design and Contingencies - $21,000)
    29         (8)  Southwest Township, T-309 over Pine
    30             Creek, Bridge Replacement                     124,000
    19920S1746B2236                 - 194 -

     1             (Base Construction Allocation -
     2             $100,000)
     3             (Land Allocation - $12,000)
     4             (Design and Contingencies - $12,000)
     5         (9)  Spring Creek Township, T-395 over
     6             Hosmer Run, Bridge Replacement                207,000
     7             (Base Construction Allocation -
     8             $165,000)
     9             (Land Allocation - $21,000)
    10             (Design and Contingencies - $21,000)
    11         (10)  Columbus Township, T-340 on Lacy Road
    12             over Hare Creek, Bridge Replacement           166,000
    13             (Base Construction Allocation -
    14             $132,000)
    15             (Land Allocation - $17,000)
    16             (Design and Contingencies - $17,000)
    17         (11)  Columbus Township, T-350 on
    18             Alterbottom over Tamarock Swamp
    19             Tributary, Bridge Replacement                  84,000
    20             (Base Construction Allocation -
    21             $68,000)
    22             (Land Allocation - $8,000)
    23             (Design and Contingencies - $8,000)
    24         (12)  Spring Creek Township, T-425 over
    25             Spring Creek, Bridge Replacement              161,000
    26             (Base Construction Allocation -
    27             $129,000)
    28             (Land Allocation - $16,000)
    29             (Design and Contingencies - $16,000)
    30         (13)  Brokenstraw Township, T-444 on Irvine
    19920S1746B2236                 - 195 -

     1             Run Road over Irvine Run, Bridge
     2             Replacement                                   110,000
     3             (Base Construction Allocation -
     4             $88,000)
     5             (Land Allocation - $11,000)
     6             (Design and Contingencies - $11,000)
     7         (14)  Eldred Township, T-355 on Glossville
     8             Road over Caldwell Creek, Bridge
     9             Replacement                                   119,000
    10             (Base Construction Allocation -
    11             $95,000)
    12             (Land Allocation - $12,000)
    13             (Design and Contingencies - $12,000)
    14         (15)  Eldred Township, T-355 on Eureka Road
    15             over Caldwell Creek, Bridge
    16             Replacement                                   151,000
    17             (Base Construction Allocation -
    18             $121,000)
    19             (Land Allocation - $15,000)
    20             (Design and Contingencies - $15,000)
    21         (16)  Columbia Township, T-639 on Stewart
    22             Road over Winton Run, Bridge
    23             Replacement                                   144,000
    24             (Base Construction Allocation -
    25             $116,000)
    26             (Land Allocation - $14,000)
    27             (Design and Contingencies - $14,000)
    28         (17)  Freehold Township, T-406 on Huntley
    29             Road over Mill Creek, Bridge
    30             Replacement                                   157,000
    19920S1746B2236                 - 196 -

     1             (Base Construction Allocation -
     2             $125,000)
     3             (Land Allocation - $16,000)
     4             (Design and Contingencies - $16,000)
     5         (18)  Sugar Grove Township, T-539 over
     6             Steelwater Creek, Bridge Replacement          122,000
     7             (Base Construction Allocation -
     8             $98,000)
     9             (Land Allocation - $12,000)
    10             (Design and Contingencies - $12,000)
    11         (19)  Sugar Grove Township, T-587 on Creek
    12             Road over Sonders Run, Bridge
    13             Replacement                                   122,000
    14             (Base Construction Allocation -
    15             $98,000)
    16             (Land Allocation - $12,000)
    17             (Design and Contingencies - $12,000)
    18         (20)  Tidioute Borough, First Street over
    19             McGuire Run, Bridge Replacement               138,000
    20             (Base Construction Allocation -
    21             $110,000)
    22             (Land Allocation - $14,000)
    23             (Design and Contingencies - $14,000)
    24         (21)  Tidioute Borough, Grant Street over
    25             Tidioute Creek, Bridge Replacement            130,000
    26             (Base Construction Allocation -
    27             $104,000)
    28             (Land Allocation - $13,000)
    29             (Design and Contingencies - $13,000)
    30         (22)  Sugar Grove Township, T-452 on Deer
    19920S1746B2236                 - 197 -

     1             Run Road over Patchen Run, Bridge
     2             Replacement                                   140,000
     3             (Base Construction Allocation -
     4             $112,000)
     5             (Land Allocation - $14,000)
     6             (Design and Contingencies - $14,000)
     7     (b)  State Bridges
     8         (1)  S.R.0957 over Stillwater Creek, Sugar
     9             Grove Township, Bridge Replacement            350,000
    10             (Base Construction Allocation -
    11             $300,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $30,000)
    14         (2)  S.R.3005 on Hickory Street over
    15             Allegheny Run, Warren Borough, Bridge
    16             Rehabilitation                              2,000,000
    17             (Base Construction Allocation -
    18             $1,850,000)
    19             (Land Allocation - $50,000)
    20             (Design and Contingencies - $100,000)
    21         (3)  S.R.3010 over Whitney Run, Spring
    22             Creek Township, Bridge Replacement            440,000
    23             (Base Construction Allocation -
    24             $390,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $30,000)
    27         (4)  S.R.0127 over Gordon Run, Triumph
    28             Township, Bridge Replacement                  300,000
    29             (Base Construction Allocation -
    30             $250,000)
    19920S1746B2236                 - 198 -

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $30,000)
     3         (5)  S.R.0027 over Hosmer Creek, Pittsfield
     4             Township, Bridge Replacement                  560,000
     5             (Base Construction Allocation -
     6             $480,000)
     7             (Land Allocation - $30,000)
     8             (Design and Contingencies - $50,000)
     9         (6)  S.R.3010 over Brokenstraw Creek,
    10             Spring Creek Township, Bridge
    11             Replacement                                 1,450,000
    12             (Base Construction Allocation -
    13             $1,200,000)
    14             (Land Allocation - $50,000)
    15             (Design and Contingencies - $200,000)
    16         (7)  S.R.3014 on Cole Hill Road over
    17             Brokenstraw Creek, Pittsfield Township,
    18             Bridge Replacement                            600,000
    19             (Base Construction Allocation -
    20             $520,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $70,000)
    23         (8)  S.R.3022 over Irvine Run, Brokenstraw
    24             Township, Bridge Replacement                  630,000
    25             (Base Construction Allocation -
    26             $500,000)
    27             (Land Allocation - $30,000)
    28             (Design and Contingencies - $100,000)
    29         (9)  S.R.0059, T.R.59, Devils Elbow Bridge
    30             over Jakes Run, Mead Township, Bridge
    19920S1746B2236                 - 199 -

     1             Rehabilitation                              2,000,000
     2             (Base Construction Allocation -
     3             $1,830,000)
     4             (Land Allocation - $20,000)
     5             (Design and Contingencies - $150,000)
     6         (10)  S.R.0069 on Jackson Road over Jackson
     7             Run, Conewango Township, Bridge
     8             Replacement                                   330,000
     9             (Base Construction Allocation -
    10             $281,000)
    11             (Land Allocation - $17,000)
    12             (Design and Contingencies - $32,000)
    13         (11)  S.R.0069 on Jackson Road over Jackson
    14             Run, Conewango Township, Bridge
    15             Replacement                                   320,000
    16             (Base Construction Allocation -
    17             $272,000)
    18             (Land Allocation - $16,000)
    19             (Design and Contingencies - $32,000)
    20         (12)  S.R.0958 over Little Brokenstraw
    21             Creek, Freehold Township, Bridge
    22             Replacement                                   240,000
    23             (Base Construction Allocation -
    24             $204,000)
    25             (Land Allocation - $12,000)
    26             (Design and Contingencies - $24,000)
    27         (13)  S.R.2010 Brown Run Road over Browns
    28             Run, Mead Township, Bridge Replacement        320,000
    29             (Base Construction Allocation -
    30             $272,000)
    19920S1746B2236                 - 200 -

     1             (Land Allocation - $16,000)
     2             (Design and Contingencies - $32,000)
     3         (14)  S.R.0006 in Village of Saybrook over
     4             Four Mile Run, Sheffield Township,
     5             Bridge Replacement                            451,000
     6             (Base Construction Allocation -
     7             $383,000)
     8             (Land Allocation - $23,000)
     9             (Design and Contingencies - $45,000)
    10  Section 67.  Washington County.
    11     (a)  Local Bridges
    12         (1)  Cecil Township, Segment 0130 Offset
    13             2811, Bridge Replacement                      250,000
    14             (Base Construction Allocation -
    15             $250,000)
    16         (2)  Cecil Township, Segment 0080 Offset
    17             1384, Bridge Replacement                       60,000
    18             (Base Construction Allocation -
    19             $60,000)
    20         (3)  Cross Creek Township, Segment 0020
    21             Offset 0027, Bridge Replacement               500,000
    22             (Base Construction Allocation -
    23             $500,000)
    24         (4)  Canonsburg Borough, South Central
    25             Avenue over Branch of Chartiers Creek,
    26             Bridge Replacement                          1,000,000
    27             (Base Construction Allocation -
    28             $1,000,000)
    29         (5)  Donegal Township, Segment 0080 Offset
    30             0039, Bridge Replacement                      325,000
    19920S1746B2236                 - 201 -

     1             (Base Construction Allocation -
     2             $325,000)
     3         (6)  Cross Creek Township, T-433, Parker
     4             Road Bridge over Middle Fork Creek,
     5             Bridge Replacement                             73,000
     6             (Base Construction Allocation -
     7             $67,000)
     8             (Design and Contingencies - $6,000)
     9     (b)  State Bridges
    10         (1)  S.R.0040, Lane-Bane Bridge over
    11             Monongahela River, West Brownsville
    12             Borough, Bridge Rehabilitation              6,805,000
    13             (Base Construction Allocation -
    14             $6,000,000)
    15             (Land Allocation - $5,000)
    16             (Design and Contingencies - $800,000)
    17         (2)  S.R.0136, Beau Street Bridge over I-
    18             70, East Washington Borough, Bridge
    19             Rehabilitation                              1,266,000
    20             (Base Construction Allocation -
    21             $1,142,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $114,000)
    24         (3)  S.R.0231, Templeton Bridge over Branch
    25             of Templeton's Fork, East Finley
    26             Township, Bridge Replacement                  250,000
    27             (Base Construction Allocation -
    28             $200,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $30,000)
    19920S1746B2236                 - 202 -

     1         (4)  S.R.0917, Saw Mill Run Bridge over
     2             Branch of Saw Mill Run, Fallowfield
     3             Township, Bridge Replacement                  275,000
     4             (Base Construction Allocation -
     5             $225,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $30,000)
     8         (5)  S.R.0980, Canonsburg Bridge No.1 over
     9             Chartiers Creek, Canonsburg Borough,
    10             Bridge Replacement                          1,010,000
    11             (Base Construction Allocation -
    12             $885,000)
    13             (Land Allocation - $40,000)
    14             (Design and Contingencies - $85,000)
    15         (6)  S.R.0980, Canonsburg Bridge No.2 over
    16             Bridge of Chartiers Creek, Canonsburg
    17             Borough, Bridge Replacement                   590,000
    18             (Base Construction Allocation -
    19             $500,000)
    20             (Land Allocation - $40,000)
    21             (Design and Contingencies - $50,000)
    22         (7)  S.R.1087, Crookham Bridge over Mingo
    23             Creek, Carroll Township, Bridge
    24             Replacement                                   190,000
    25             (Base Construction Allocation -
    26             $159,000)
    27             (Land Allocation - $15,000)
    28             (Design and Contingencies - $16,000)
    29         (8)  S.R.2037, Westside Bridge over
    30             Westside Creek, Fallowfield Township,
    19920S1746B2236                 - 203 -

     1             Bridge Replacement                             84,000
     2             (Base Construction Allocation -
     3             $66,000)
     4             (Land Allocation - $11,000)
     5             (Design and Contingencies - $7,000)
     6         (9)  S.R.4004, Raccoon Creek Bridge over
     7             Raccoon Creek, Hanover and Smith
     8             Townships, Bridge Replacement                 750,000
     9             (Base Construction Allocation -
    10             $650,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $80,000)
    13         (10)  S.R.4037, Robinson Run Bridge over
    14             Branch of Robinson Run, Robinson
    15             Township, Bridge Replacement                  400,000
    16             (Base Construction Allocation -
    17             $345,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $35,000)
    20         (11)  S.R.1002, Segment 0100 Offset 1284,
    21             Peters Township, Bridge Replacement           750,000
    22             (Base Construction Allocation -
    23             $750,000)
    24         (12)  S.R.2041 over Branch of Pike Run,
    25             West Pike Run Township, Bridge
    26             Replacement                                   500,000
    27             (Base Construction Allocation -
    28             $500,000)
    29         (13)  S.R.4018, Cross Creek Bridge East of
    30             Avella, Bridge Replacement                    350,000
    19920S1746B2236                 - 204 -

     1             (Base Construction Allocation -
     2             $350,000)
     3         (14)  S.R.3023 over LR798, Donegal
     4             Township, Bridge Replacement                  750,000
     5             (Base Construction Allocation -
     6             $750,000)
     7         (15)  S.R.1010 over Brush Run, Peters
     8             Township, Bridge Replacement                  750,000
     9             (Base Construction Allocation -
    10             $750,000)
    11         (16)  S.R.0519, Segment 0150 Offset 0921,
    12             North Strabane Township, Bridge
    13             Replacement                                 1,500,000
    14             (Base Construction Allocation -
    15             $1,500,000)
    16  Section 68. Wayne County.
    17     (a)  Local Bridges
    18         (1)  Buckingham Township, T-603, Bridge
    19             No.5 over Equinunk Creek (Factory),
    20             Bridge Replacement                            281,000
    21             (Base Construction Allocation -
    22             $250,000)
    23             (Land Allocation - $1,000)
    24             (Design and Contingencies - $30,000)
    25         (2)  Damascus Township, T-508, Bridge No.9
    26             over South Branch of Calkins Creek
    27             (Boyd's Mills), Bridge Replacement            132,000
    28             (Base Construction Allocation -
    29             $110,000)
    30             (Land Allocation - $2,000)
    19920S1746B2236                 - 205 -

     1             (Design and Contingencies - $20,000)
     2         (3)  Damascus Township, T-677, Bridge No.10
     3             over North Branch of Calkins Creek
     4             (High Bridge), Bridge Replacement             122,000
     5             (Base Construction Allocation -
     6             $100,000)
     7             (Land Allocation - $2,000)
     8             (Design and Contingencies - $20,000)
     9         (4)  Damascus Township, T-636, Bridge No.11
    10             over North Branch of Calkins Creek
    11             (Bishoff), Bridge Replacement                 220,000
    12             (Base Construction Allocation -
    13             $180,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $30,000)
    16         (5)  Preston Township, T-682, Bridge No.30
    17             over Equinunk Creek (Dolans), Bridge
    18             Replacement                                   172,000
    19             (Base Construction Allocation -
    20             $150,000)
    21             (Land Allocation - $2,000)
    22             (Design and Contingencies - $20,000)
    23         (6)  Preston Township, T-684, Bridge No.31
    24             over Equinunk Creek (Williams), Bridge
    25             Replacement                                   209,000
    26             (Base Construction Allocation -
    27             $180,000)
    28             (Land Allocation - $4,000)
    29             (Design and Contingencies - $25,000)
    30         (7)  Prompton Borough, T-444, Bridge No.32
    19920S1746B2236                 - 206 -

     1             over Van Auken Creek, Bridge
     2             Replacement                                   180,000
     3             (Base Construction Allocation -
     4             $150,000)
     5             (Land Allocation - $5,000)
     6             (Design and Contingencies - $25,000)
     7     (b)  State Bridges
     8         (1)  S.R.1016 Bridge over Hollister Creek,
     9             Damascus Township, Bridge Replacement         415,000
    10             (Base Construction Allocation -
    11             $360,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $45,000)
    14         (2)  S.R.0191 over Dyberry Creek, Dyberry
    15             Township, Bridge Replacement                  570,000
    16             (Base Construction Allocation -
    17             $500,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $60,000)
    20         (3)  S.R.0006 Bridge over Lackawaxen River,
    21             Hawley Borough, Bridge Replacement          2,395,000
    22             (Base Construction Allocation -
    23             $2,120,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $255,000)
    26         (4)  S.R.4043 Bridge over Branch of Sherman
    27             Creek, Scott Township, Bridge
    28             Replacement                                   469,000
    29             (Base Construction Allocation -
    30             $410,000)
    19920S1746B2236                 - 207 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $49,000)
     3         (5)  S.R.4023, Bridge No.2 over West Branch
     4             of Lackawaxen River, Mount Pleasant
     5             Township, Bridge Replacement                  410,000
     6             (Base Construction Allocation -
     7             $358,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $42,000)
    10         (6)  S.R.4037 Bridge over Oquaga Creek,
    11             Scott Township, Bridge Replacement            805,000
    12             (Base Construction Allocation -
    13             $710,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $85,000)
    16         (7)  S.R.1002 over Delaware River, Damascus
    17             Township, Bridge Replacement                3,410,000
    18             (Base Construction Allocation -
    19             $3,000,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $400,000)
    22         (8)  S.R.0191 over Delaware River,
    23             Buckingham Township, Bridge
    24             Replacement                                 1,240,000
    25             (Base Construction Allocation -
    26             $1,100,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $130,000)
    29         (9)  S.R.4023 Bridge over West Branch of
    30             Lackawaxen River, Mount Pleasant
    19920S1746B2236                 - 208 -

     1             Township, Bridge Replacement                  410,000
     2             (Base Construction Allocation -
     3             $358,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $42,000)
     6         (10)  S.R.4008 Bridge over Johnson Creek,
     7             Mount Pleasant Township, Bridge
     8             Replacement                                   395,000
     9             (Base Construction Allocation -
    10             $344,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $41,000)
    13         (11)  S.R.0296 Bridge over Branch of Middle
    14             Creek,
    15             Canaan Township, Bridge Replacement           420,000
    16             (Base Construction Allocation -
    17             $365,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $45,000)
    20         (12)  S.R.0296 Bridge over Branch of
    21             Lackawaxen River, Clinton Township,
    22             Bridge Replacement                            585,000
    23             (Base Construction Allocation -
    24             $515,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $60,000)
    27         (13)  S.R.0196 Bridge over Middle Creek,
    28             Lake Township, Bridge Replacement           1,018,000
    29             (Base Construction Allocation -
    30             $900,000)
    19920S1746B2236                 - 209 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $108,000)
     3         (14)  S.R.0191 Bridge over Shehawken Creek,
     4             Buckingham Township, Bridge
     5             Replacement                                   816,000
     6             (Base Construction Allocation -
     7             $720,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $86,000)
    10         (15)  S.R.0191 Bridge over Branch of
    11             Wallenpaupack Creek, Dreher Township,
    12             Bridge Replacement                            402,000
    13             (Base Construction Allocation -
    14             $350,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $42,000)
    17         (16)  S.R.0507 Bridge over Wallenpaupack
    18             Creek, Dreher Township, Bridge
    19             Replacement                                   710,000
    20             (Base Construction Allocation -
    21             $625,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $75,000)
    24         (17)  S.R.1023 Bridge over South Branch
    25             Equinunk Creek, Manchester Township,
    26             Bridge Replacement                            402,000
    27             (Base Construction Allocation -
    28             $350,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $42,000)
    19920S1746B2236                 - 210 -

     1         (18)  S.R.4007 Bridge over Crooked Creek,
     2             Buckingham Township, Bridge
     3             Replacement                                   458,000
     4             (Base Construction Allocation -
     5             $400,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $48,000)
     8         (19)  S.R.4007 Bridge over Equinunk Creek,
     9             Manchester Township, Bridge
    10             Replacement                                   660,000
    11             (Base Construction Allocation -
    12             $580,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $70,000)
    15         (20)  S.R.3046 Bridge over Spring Run,
    16             Dreher Township, Bridge Replacement           346,000
    17             (Base Construction Allocation -
    18             $300,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $36,000)
    21         (21)  S.R.3002 Bridge over Stevens Creek,
    22             Sterling Township, Bridge Replacement         503,000
    23             (Base Construction Allocation -
    24             $440,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $53,000)
    27         (22)  S.R.2007 Bridge over Carley Brook,
    28             Honesdale Borough, Bridge Replacement         462,000
    29             (Base Construction Allocation -
    30             $404,000)
    19920S1746B2236                 - 211 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $48,000)
     3  Section 69. Westmoreland County.
     4     (a)  Local Bridges
     5         (1)  Latrobe Borough, Loyalhanna Street
     6             Bridge over Conrail and S.R.9900,
     7             Bridge Replacement                            450,000
     8             (Base Construction Allocation -
     9             $400,000)
    10             (Land Allocation - $50,000)
    11         (2)  Hempfield Township, T-471, Bridge on
    12             Lash Road, Bridge Replacement                 518,000
    13             (Base Construction Allocation -
    14             $450,000)
    15             (Design and Contingencies - $68,000)
    16         (3)  Sewickley Township, T-623 over
    17             Tributary of Little Sewickley Creek,
    18             Bridge Replacement                            130,000
    19             (Base Construction Allocation -
    20             $100,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $20,000)
    23         (4)  Hempfield Township, T-398, Old Route
    24             No.30, Bridge Replacement                     530,000
    25             (Base Construction Allocation -
    26             $400,000)
    27             (Land Allocation - $40,000)
    28             (Design and Contingencies - $90,000)
    29         (5)  Hempfield Township, T-865, Old Airport
    30             Road Hill Bridge, Bridge Replacement          630,000
    19920S1746B2236                 - 212 -

     1             (Base Construction Allocation -
     2             $500,000)
     3             (Land Allocation - $30,000)
     4             (Design and Contingencies - $100,000)
     5         (6)  Hempfield Township, T-987, Brookdale
     6             Bridge, Bridge Replacement                    550,000
     7             (Base Construction Allocation -
     8             $450,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $90,000)
    11         (7)  City of Greensburg, Laird Street
    12             Bridge, Bridge Replacement                    235,000
    13             (Base Construction Allocation -
    14             $200,000)
    15             (Land Allocation - $5,000)
    16             (Design and Contingencies - $30,000)
    17         (8)  Murrysville Borough and Washington
    18             Township, Ludwig Road Bridge No.39,
    19             Bridge Replacement                            190,000
    20             (Base Construction Allocation -
    21             $150,000)
    22             (Land Allocation - $5,000)
    23             (Design and Contingencies - $35,000)
    24         (9)  Sewickley Township, T-398 Bridge over
    25             Little Sewickley Creek, Bridge
    26             Replacement                                   703,000
    27             (Base Construction Allocation -
    28             $630,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $63,000)
    19920S1746B2236                 - 213 -

     1         (10)  Murrysville and Delmont Boroughs, Old
     2             William Penn Highway Bridge E11, Bridge
     3             Replacement                                   185,000
     4             (Base Construction Allocation -
     5             $150,000)
     6             (Design and Contingencies - $35,000)
     7         (11)  Murrysville Borough, Kemerer Road
     8             Bridge No.20 over Branch of Steels Run,
     9             Bridge Replacement                             95,000
    10             (Base Construction Allocation -
    11             $75,000)
    12             (Design and Contingencies - $20,000)
    13         (12)  Youngwood Borough, Hillis Street
    14             Bridge No.64, Bridge Replacement              265,000
    15             (Base Construction Allocation -
    16             $233,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $22,000)
    19         (13)  Youngwood Borough, Depot Street
    20             Bridge, Bridge Replacement                    545,000
    21             (Base Construction Allocation -
    22             $475,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $60,000)
    25         (14)  Hempfield Township, T-398, Old Route
    26             30 Bridge, Bridge Replacement                 230,000
    27             (Base Construction Allocation -
    28             $200,000)
    29             (Design and Contingencies - $30,000)
    30         (15)  Hempfield Township, T-470, Ladysmith
    19920S1746B2236                 - 214 -

     1             Road Bridge, Bridge Replacement               690,000
     2             (Base Construction Allocation -
     3             $600,000)
     4             (Design and Contingencies - $90,000)
     5         (16)  Hempfield Township, T-748, Sweitzer
     6             Road Bridge, Bridge Replacement               920,000
     7             (Base Construction Allocation -
     8             $800,000)
     9             (Design and Contingencies - $120,000)
    10         (17)  Hempfield Township, T-474, Whigham
    11             Road Bridge, Bridge Replacement               576,000
    12             (Base Construction Allocation -
    13             $500,000)
    14             (Land Allocation - $1,000)
    15             (Design and Contingencies - $75,000)
    16         (18)  Hempfield Township, T-655, Rocky
    17             Mountain Bridge, Bridge Replacement           518,000
    18             (Base Construction Allocation -
    19             $450,000)
    20             (Design and Contingencies - $68,000)
    21         (19)  Hempfield Township, T-792, Pore Road
    22             Bridge, Bridge Replacement                    230,000
    23             (Base Construction Allocation -
    24             $200,000)
    25             (Design and Contingencies - $30,000)
    26         (20) Hempfield Township, T-865, Airport
    27             Hill Road Bridge, Bridge Replacement          575,000
    28             (Base Construction Allocation -
    29             $500,000)
    30             (Design and Contingencies - $75,000)
    19920S1746B2236                 - 215 -

     1         (21)  Hempfield Township, T-987, Brookdale
     2             Drive Bridge, Bridge Replacement              518,000
     3             (Base Construction Allocation -
     4             $450,000)
     5             (Design and Contingencies - $68,000)
     6         (22)  New bridge spanning Allegheny River
     7             to connect S.R.0028 and S.R.0366,
     8             Bridge Replacement                        131,500,000
     9         (23)  City of New Kensington, Locust Street
    10             Viaduct, Bridge Replacement                 1,500,000
    11             (Base Construction Allocation -
    12             $1,500,000)
    13         (24)  City of Lower Burrell, Edgecliff Road
    14             Bridge, Bridge Replacement                    225,000
    15             (Base Construction Allocation -
    16             $225,000)
    17         (25)  North Huntington Township, Bratkovich
    18             Road Bridge, Bridge Replacement             9,152,000
    19             (Base Construction Allocation -
    20             $9,152,000)
    21         (26)  North Huntington Township, Long Run
    22             Bridge over Long Run, Bridge
    23             Replacement                                    46,000
    24             (Base Construction Allocation -
    25             $32,000)
    26             (Land Allocation - $11,000)
    27             (Design and Contingencies - $3,000)
    28         (27)  Wallace Avenue Bridge, Bridge
    29             Replacement                                    22,000
    30             (Base Construction Allocation -
    19920S1746B2236                 - 216 -

     1             $12,000)
     2             (Design and Contingencies - $10,000)
     3         (28)  North Huntington Township, McCavett
     4             Road Bridge over Conrail, Bridge
     5             Replacement                                 1,115,000
     6             (Base Construction Allocation -
     7             $1,015,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $90,000)
    10         (29)  City of New Kensington, Bridge No.1,
    11             Locust Street, Bridge Replacement              30,000
    12             (Base Construction Allocation -
    13             $30,000)
    14         (30)  City of New Kensington, Fourth Street
    15             Bridge No.2 over Little Pucketa Creek,
    16             Bridge Construction                            16,000
    17             (Base Construction Allocation -
    18             $16,000)
    19         (31)  City of New Kensington, Fourth Street
    20             Bridge No.2, Bridge Replacement                29,000
    21             (Base Construction Allocation -
    22             $29,000)
    23         (32)  City of New Kensington, Locust Street
    24             Bridge No.1 over Conrail Railroad,
    25             Bridge Construction                            65,000
    26             (Base Construction Allocation -
    27             $65,000)
    28         (33)  Upper Burrell Township, Hartge Road
    29             over Little Pucketa Creek, Bridge
    30             Replacement                                   110,000
    19920S1746B2236                 - 217 -

     1             (Base Construction Allocation -
     2             $100,000)
     3             (Design and Contingencies - $10,000)
     4     (b)  State Bridges
     5         (1)  S.R.0056, Seward Bridge over Railroad
     6             and Borough Road, St. Clair Township,
     7             Bridge Replacement                          2,650,000
     8             (Base Construction Allocation -
     9             $2,385,000)
    10             (Land Allocation - $40,000)
    11             (Design and Contingencies - $225,000)
    12         (2)  S.R.0070 Bridge over S.R.3005 near
    13             Pricedale, Rostraver Township, Bridge
    14             Rehabilitation                              1,405,000
    15             (Base Construction Allocation -
    16             $1,250,000)
    17             (Design and Contingencies - $155,000)
    18         (3)  S.R.0070 Bridge over S.R.3003 near
    19             Speers Run, Rostraver Township, Bridge
    20             Rehabilitation                              3,424,000
    21             (Base Construction Allocation -
    22             $3,140,000)
    23             (Design and Contingencies - $284,000)
    24         (4)  S.R.0259, Snyders Run Bridge over
    25             Branch of Snyders Run, Fairfield
    26             Township, Bridge Replacement                  375,000
    27             (Base Construction Allocation -
    28             $315,000)
    29             (Land Allocation - $30,000)
    30             (Design and Contingencies - $30,000)
    19920S1746B2236                 - 218 -

     1         (5)  S.R.0259, Conrail Bolivar Underpass
     2             No.2 over S.R.0259, Bolivar Borough and
     3             Fairfield Township, Bridge Replacement        460,000
     4             (Base Construction Allocation -
     5             $350,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $100,000)
     8         (6)  S.R.0711, Koffer Run Bridge over
     9             Koffer Run, Ligonier Township, Bridge
    10             Replacement                                   350,000
    11             (Base Construction Allocation -
    12             $300,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $30,000)
    15         (7)  S.R.1019, Hanna's Run Bridge over
    16             Branch of Hanna's Run, Ligonier
    17             Township, Bridge Replacement                  350,000
    18             (Base Construction Allocation -
    19             $300,000)
    20             (Land Allocation - $20,000)
    21             (Design and Contingencies - $30,000)
    22         (8)  S.R.1028, Luxor Bridge over Little
    23             Crabtree Creek, Hempfield Township,
    24             Bridge Replacement                            350,000
    25             (Base Construction Allocation -
    26             $300,000)
    27             (Land Allocation - $20,000)
    28             (Design and Contingencies - $30,000)
    29         (9)  S.R.1071, Hendricks Creek Bridge and
    30             Approach, T-987, Bridge Replacement           270,000
    19920S1746B2236                 - 219 -

     1             (Base Construction Allocation -
     2             $240,000)
     3             (Land Allocation - $5,000)
     4             (Design and Contingencies - $25,000)
     5         (10)  S.R.3003, Speers Run Bridge over
     6             Speers Run, Rostraver Township, Bridge
     7             Replacement                                   475,000
     8             (Base Construction Allocation -
     9             $415,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $40,000)
    12         (11)  S.R.3022 Bridge over Small Stream,
    13             North Huntingdon Township, Bridge
    14             Replacement                                   425,000
    15             (Base Construction Allocation -
    16             $370,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $35,000)
    19         (12)  S.R.4024, Boquet Bridge over Brush
    20             Run, Penn Township, Bridge Replacement        297,000
    21             (Base Construction Allocation -
    22             $263,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $24,000)
    25         (13)  S.R.0070, I-70 Bridge over Sewickley
    26             Creek, Sewickley Township, Bridge
    27             Rehabilitation                                660,000
    28             (Base Construction Allocation -
    29             $600,000)
    30             (Design and Contingencies - $60,000)
    19920S1746B2236                 - 220 -

     1         (14)  S.R.4075 over Chartiers Run, Upper
     2             Burrell Township, Bridge Replacement          110,000
     3             (Base Construction Allocation -
     4             $50,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $50,000)
     7         (15)  S.R.4036 over Pucketa Creek, Upper
     8             Burrell Township, Bridge Replacement          420,000
     9             (Base Construction Allocation -
    10             $350,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $50,000)
    13         (16)  S.R.4032 Bridge over Pucketa Creek,
    14             Upper Burrell Township, Bridge
    15             Replacement                                   135,000
    16             (Base Construction Allocation -
    17             $75,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $50,000)
    20         (17)  S.R.4075 over Chartiers Run, Upper
    21             Burrell Township, Bridge Replacement          110,000
    22             (Base Construction Allocation -
    23             $50,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $50,000)
    26         (18)  S.R.0366 over Little Pucketa Creek,
    27             City of New Kensington, Bridge
    28             Replacement                                   470,000
    29             (Base Construction Allocation -
    30             $400,000)
    19920S1746B2236                 - 221 -

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $50,000)
     3         (19)  S.R.0056 over Little Pucketa Creek,
     4             City of New Kensington, Bridge
     5             Replacement                                   160,000
     6             (Base Construction Allocation -
     7             $100,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $50,000)
    10         (20)  S.R.0056 Bridge over Branch of
    11             Pucketa Creek, City of Lower Burrell,
    12             Bridge Replacement                            110,000
    13             (Base Construction Allocation -
    14             $50,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $50,000)
    17         (21)  S.R.0366 over Pucketa Creek, City of
    18             Lower Burrell, Bridge Replacement             110,000
    19             (Base Construction Allocation -
    20             $50,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $50,000)
    23         (22)  S.R.3012, Sewickley Bridge over Big
    24             Sewickley Creek, South Huntington
    25             Township, Bridge Replacement                   51,000
    26             (Base Construction Allocation -
    27             $36,000)
    28             (Land Allocation - $11,000)
    29             (Design and Contingencies - $4,000)
    30         (23)  S.R.2033, Mansville Bridge over
    19920S1746B2236                 - 222 -

     1             Keefer Run, Cook Township, Bridge
     2             Replacement                                    59,000
     3             (Base Construction Allocation -
     4             $44,000)
     5             (Land Allocation - $11,000)
     6             (Design and Contingencies - $4,000)
     7         (24)  S.R.0982, Bradenville Bridge over
     8             Saxmore Run, Derry Township, Bridge
     9             Replacement                                   446,000
    10             (Base Construction Allocation -
    11             $385,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $41,000)
    14         (25)  S.R.1028, Luxor Bridge, Hempfield
    15             Township, Bridge Replacement                  350,000
    16             (Base Construction Allocation -
    17             $300,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $30,000)
    20         (26)  S.R.0981, Smithton Bridge over Barron
    21             Run, South Huntington Township, Bridge
    22             Replacement                                   196,000
    23             (Base Construction Allocation -
    24             $159,000)
    25             (Land Allocation - $12,000)
    26             (Design and Contingencies - $25,000)
    27         (27)  S.R.0217, Miller Run Bridge, Derry
    28             Township, Bridge Replacement                  220,000
    29             (Base Construction Allocation -
    30             $180,000)
    19920S1746B2236                 - 223 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $30,000)
     3  Section 70. Wyoming County.
     4     (a)  Local Bridges (Reserved)
     5     (b)  State Bridges
     6         (1)  S.R.2021 Bridge over Branch of Beaver
     7             Creek, Falls Township, Bridge
     8             Replacement                                   783,000
     9             (Base Construction Allocation -
    10             $690,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $83,000)
    13         (2)  S.R.2012 Bridge over Branch of
    14             Tunkhannock Creek, Clinton Township,
    15             Bridge Replacement                            884,000
    16             (Base Construction Allocation -
    17             $780,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $94,000)
    20         (3)  S.R.2002 Bridge over Whitelock Creek,
    21             Exeter Township, Bridge Replacement           654,000
    22             (Base Construction Allocation -
    23             $575,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $69,000)
    26         (4)  S.R.3007 Bridge over Railroad,
    27             Washington Township, Bridge
    28             Replacement                                   915,000
    29             (Base Construction Allocation -
    30             $808,000)
    19920S1746B2236                 - 224 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $97,000)
     3         (5)  S.R.1025 Bridge over Conrail Railroad,
     4             Nicholson Borough, Bridge Replacement         783,000
     5             (Base Construction Allocation -
     6             $690,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $83,000)
     9         (6)  S.R.2027 Bridge over Beaver Creek,
    10             Falls Township, Bridge Replacement            404,000
    11             (Base Construction Allocation -
    12             $352,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $42,000)
    15         (7)  S.R.0011 over T.R.6, Clinton Township,
    16             Bridge Replacement                          1,240,000
    17             (Base Construction Allocation -
    18             $1,100,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $130,000)
    21         (8)  S.R.0006 over Tuscarora Creek,
    22             Braintrim Township, Bridge Replacement      1,910,000
    23             (Base Construction Allocation -
    24             $1,700,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $200,000)
    27         (9)  S.R.1014 Bridge over Lake Sheridan
    28             Outlet, Nicholson Township, Bridge
    29             Replacement                                   390,000
    30             (Base Construction Allocation -
    19920S1746B2236                 - 225 -

     1             $340,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $40,000)
     4         (10)  S.R.0087 Bridge over Susquehanna
     5             River, Mehoopany Township, Bridge
     6             Replacement                                 5,210,000
     7             (Base Construction Allocation -
     8             $4,700,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $500,000)
    11         (11)  S.R.0029 Bridge over Bowman's Creek,
    12             Noxen Township, Bridge Replacement            732,000
    13             (Base Construction Allocation -
    14             $645,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $77,000)
    17         (12)  S.R.2039 Bridge over Beaver Run
    18             Creek, Noxen Township, Bridge
    19             Replacement                                   738,000
    20             (Base Construction Allocation -
    21             $650,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $78,000)
    24         (13)  S.R.3001 Bridge over Little Mehoopany
    25             Creek, Windham Township, Bridge
    26             Replacement                                   486,000
    27             (Base Construction Allocation -
    28             $425,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $51,000)
    19920S1746B2236                 - 226 -

     1         (14)  S.R.3002 Bridge over Bowman's Creek,
     2             Noxen Township, Bridge Replacement            928,000
     3             (Base Construction Allocation -
     4             $820,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $98,000)
     7         (15)  S.R.0029 Bridge over Swail Brook,
     8             Tunkhannock Borough, Bridge
     9             Replacement                                   540,000
    10             (Base Construction Allocation -
    11             $473,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $57,000)
    14         (16)  S.R.0092 Bridge over Field Brook,
    15             Nicholson Township, Bridge Replacement        520,000
    16             (Base Construction Allocation -
    17             $455,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $55,000)
    20         (17)  S.R.0307 Bridge over Buttermilk
    21             Creek, Falls Township, Bridge
    22             Replacement                                   592,000
    23             (Base Construction Allocation -
    24             $520,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $62,000)
    27         (18)  S.R.0307 Bridge over Beaver Creek,
    28             Falls Township, Bridge Replacement          1,208,000
    29             (Base Construction Allocation -
    30             $1,070,000)
    19920S1746B2236                 - 227 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $128,000)
     3         (19)  S.R.0307 Bridge over Buttermilk
     4             Creek, Falls Township, Bridge
     5             Replacement                                   682,000
     6             (Base Construction Allocation -
     7             $600,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $72,000)
    10         (20)  S.R.1009 Bridge over Meshoppen Creek,
    11             Lemon Township, Bridge Replacement            794,000
    12             (Base Construction Allocation -
    13             $700,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $84,000)
    16         (21)  S.R.0006, Segment 0490 Offset 0000,
    17             Bardwell Bridge over Tunkhannock Creek,
    18             Tunkhannock Township, Bridge
    19             Replacement                                 2,260,000
    20             (Base Construction Allocation -
    21             $2,000,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $250,000)
    24         (22)  S.R.0006, Segment 0560 Offset 0866,
    25             Bridge over S.R.1017, Clinton Township,
    26             Bridge Replacement                            700,000
    27             (Base Construction Allocation -
    28             $620,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $70,000)
    19920S1746B2236                 - 228 -

     1         (23)  S.R.0117 Segment 0020 Offset 1773,
     2             Bridge over Outlet of Lake Sheridan,
     3             Factoryville Borough, Bridge
     4             Replacement                                   280,000
     5             (Base Construction Allocation -
     6             $240,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $30,000)
     9  Section 71.  York County.
    10     (a)  Local Bridges
    11         (1)  Penn Township, Frederick Street Bridge
    12             over Plum Creek, Bridge Replacement           250,000
    13             (Base Construction Allocation -
    14             $200,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $40,000)
    17         (2)  City of York, North Beaver Street
    18             Bridge over Willis Run, Bridge
    19             Replacement                                   362,000
    20             (Base Construction Allocation -
    21             $300,000)
    22             (Land Allocation - $12,000)
    23             (Design and Contingencies - $50,000)
    24         (3)  City of York, North Pershing Avenue
    25             Bridge over Willis Run, Bridge
    26             Replacement                                   338,000
    27             (Base Construction Allocation -
    28             $288,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $40,000)
    19920S1746B2236                 - 229 -

     1         (4)  City of York, North Newberry Street
     2             Bridge over Willis Run Bridge
     3             Replacement                                   360,000
     4             (Base Construction Allocation -
     5             $300,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $50,000)
     8         (5)  City of York, Smith Street Bridge over
     9             Willis Run, Bridge Replacement                338,000
    10             (Base Construction Allocation -
    11             $288,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $40,000)
    14         (6)  New Freedom Borough, County Bridge on
    15             Singer Road over County Railroad and
    16             Trail, Bridge Replacement                     325,000
    17             (Base Construction Allocation -
    18             $250,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $65,000)
    21     (b)  State Bridges
    22         (1)  S.R.0295, Susquehanna Trail over
    23             Conewago Creek, Conewago and Newberry
    24             Townships, Bridge Replacement               6,260,000
    25             (Base Construction Allocation -
    26             $5,400,000)
    27             (Land Allocation - $50,000)
    28             (Design and Contingencies - $810,000)
    29         (2)  S.R.4021 over Bennetts Run, Newberry
    30             Township, Bridge Replacement                  581,000
    19920S1746B2236                 - 230 -

     1             (Base Construction Allocation -
     2             $497,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $74,000)
     5         (3)  S.R.0216, Three Bridges over Lake
     6             Marburg, Penn, West Manheim and Manheim
     7             Townships, Bridge Rehabilitation              970,000
     8             (Base Construction Allocation -
     9             $825,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $125,000)
    12  Section 72.  Statewide.
    13     (a)  (Reserved)
    14     (b)  State Bridges
    15         (1)  Statewide Bridge Preservation              5,000,000
    16             (Base Construction Allocation -
    17             $4,500,000)
    18             (Design and Contingencies - $500,000)
    19  Section 73.  Limitation on expenditure of funds.
    20     Any moneys derived from the incurring of debt shall be used
    21  solely for effecting the rehabilitation, replacement or removal
    22  of bridges located on State highways. All other bridge
    23  rehabilitation, replacement or removal shall be financed, and
    24  State bridge rehabilitation, replacement or removal may also be
    25  financed, from current revenue.
    26  Section 74.  Debt authorization.
    27     The Governor, Auditor General and State Treasurer are hereby
    28  authorized and directed to borrow, from time to time, in
    29  addition to any authorization heretofore or hereafter enacted,
    30  on the credit of the Commonwealth, subject to the limitations
    19920S1746B2236                 - 231 -

     1  provided in the current capital budget, money not exceeding in
     2  the aggregate the sum of $596,448,000 as may be found necessary
     3  to carry out the acquisition and construction of the State
     4  highway projects specifically itemized in this act.
     5  Section 75.  Issue of bonds.
     6     The indebtedness authorized in this act shall be incurred
     7  from time to time and shall be evidenced by one or more series
     8  of general obligation bonds of the Commonwealth in such
     9  aggregate principal amount for each series as the Governor,
    10  Auditor General and State Treasurer shall determine, but the
    11  latest stated maturity date shall not exceed 30 years from the
    12  date of the bond first issued for each series.
    13  Section 76.  Estimated useful life of projects.
    14     The General Assembly states the estimated useful life of the
    15  projects itemized in this act as 30 years.
    16  Section 77.  Appropriation.
    17     The net proceeds of the sale of the obligations authorized in
    18  this act are hereby appropriated from the Capital Facilities
    19  Fund to the department in the maximum amount of $596,448,000 to
    20  be used by it exclusively to defray the financial costs of the
    21  State projects specifically itemized in this capital budget.
    22  After reserving or paying the expenses of the sale of the
    23  obligation, the State Treasurer shall pay out to the department
    24  the moneys as required and certified by it to be legally due and
    25  payable.
    26  Section 78.  Federal funds.
    27     In addition to those funds appropriated in section 77, all
    28  moneys received from the Federal Government for the public
    29  improvement projects specifically itemized in this act are also
    30  hereby appropriated for those projects.
    19920S1746B2236                 - 232 -

     1  Section 79.  Allocation of funds.
     2     (a)  General rule.--Whenever the department determines that
     3  the full estimated financial costs of the projects itemized in
     4  this act are not necessary for the proper design, acquisition or
     5  construction of such projects, the excess funds no longer
     6  required may be allocated by the department to increase the
     7  estimated costs of any one or more of the projects specifically
     8  itemized in a capital budget.
     9     (b)  Reimbursement of municipal expenditures.--Moneys raised
    10  or expended by municipalities after the effective date of this
    11  act, in anticipation of receipt of funds authorized for projects
    12  itemized by this act, may be reimbursable to those
    13  municipalities.
    14  Section 80.  Policy on jobs and materials.
    15     (a)  Jobs.--It is the declared policy of the Commonwealth
    16  that the construction projects authorized in this act be used,
    17  to the greatest extent possible, to provide for the creation of
    18  jobs and the rehiring of the unemployed in this Commonwealth. In
    19  order to reach this goal, firms with Commonwealth-based
    20  facilities shall be actively solicited to make bids on contracts
    21  to furnish products and materials, including, but not limited
    22  to, steel and steel products, to be used in these projects.
    23     (b)  Materials.--Every contract document entered into to
    24  undertake a project contained in this act shall provide that any
    25  steel or other products to be used or supplied in the
    26  performance of this contract shall be required to be
    27  manufactured by plants in the United States unless the secretary
    28  determines, on a contract by contract basis, that certain
    29  required products are not produced in the United States in
    30  sufficient quantities to meet the requirements of the contract.
    19920S1746B2236                 - 233 -

     1  Such a determination and the reasons therefor shall be published
     2  in the Pennsylvania Bulletin. Decisions made under this
     3  subsection shall not be inconsistent with the general provisions
     4  of the act of March 3, 1978 (P.L.6, No.3), known as the Steel
     5  Products Procurement Act.
     6  Section 81.  Payment of capital debt service.
     7     The repayment of any debt incurred pursuant to this act shall
     8  be made from the account and such repayment shall have first
     9  claim on the revenues of the account.
    10  Section 82.  Authorization and debt cumulation.
    11     The additional authorization and debt allowance provided for
    12  in this act shall be added to the total authorizations and debt
    13  incurred pursuant to the act of December 8, 1982 (P.L.848,
    14  No.235), known as the Highway-Railroad and Highway Bridge
    15  Capital Budget Act for 1982-1983, as amended.
    16  Section 83.  Effective date.
    17     This act shall take effect immediately.









    E19L72WMB/19920S1746B2236       - 234 -